​

​

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549


FORM 6-K


REPORT OF FOREIGN PRIVATE ISSUER

PURSUANT TO RULE 13a-16 OR 15d-16 UNDER

THE SECURITIES EXCHANGE ACT OF 1934

For the month of: November 2026

Commission File Number: 001-43406


​

​

Goldgroup Mining Inc.

(Translation of registrant’s name into English)

​


​

1111 Melville Street, Suite 410

Vancouver, British Columbia, V6E 3V6, Canada

(Address of principal executive office)

​

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F:

Form 20-F

☐

Form 40-F

☒

​

​

​

​

​

​

​

​

​

​

​

​


INFORMATION CONTAINED IN THIS REPORT ON FORM 6-K

This Report of Foreign Private Issuer on Form 6-K (this “Report”) of Goldgroup Mining Inc. (the “Registrant”) consists of (i) interim financial statements, management’s discussion and analysis, and related exhibits, each dated November 16, 2026, and (ii) news releases of the Registrant dated November 6, 2026, November 9, 2026, and November 18, 2026.

Exhibits 99.3, 99.4, 99.5, and 99.6 included with this Report are hereby incorporated by reference into the Registrant’s Registration Statement on Form S-8 (File No. 333-298102) (including any prospectuses forming a part of such registration statement) and shall be a part thereof from the date on which this Report is furnished, to the extent not superseded by documents or reports subsequently filed or furnished.

​


EXHIBIT INDEX

​

HIDDEN_ROW

​

​

Exhibit
No.

  ​ ​ ​

Description

99.1

​

News Release dated November 6, 2026

99.2

​

News Release dated November 9, 2026

99.3

​

Interim Financial Statements dated November 16, 2026

99.4

​

Interim MD&A dated November 16, 2026

99.5

​

Certification of Interim Filings - CEO dated November 16, 2026

99.6

​

Certification of Interim Filings - CFO dated November 16, 2026

99.7

​

News Release dated November 18, 2026

​

​

​

​

​


SIGNATURE

Pursuant to the requirements of the Securities Exchange Act of 1934, as amended, the Registrant has duly caused this Report to be signed on its behalf by the undersigned, thereunto duly authorized.

​

​

​

​

​

GOLDGROUP MINING INC.

​

(Registrant)

Date: November 18, 2026

By:

/s/ Chet Holyoak

​

​

Name:

Chet Holyoak

​

​

Title:

Chief Financial Officer

​


Exhibit 99.1

Graphic

NEWS RELEASE

GOLDGROUP PROVIDES UPDATE ON TECHNICAL STUDIES, EXPLORATION AND DRILLING PROGRAMS

Multiple Work Programs Underway Across Four 100%-Owned Gold Assets as Company Advances Resource Growth, Mine Optimization, San Francisco Restart and Back Forty Feasibility

​

Vancouver, Canada – November 6, 2026 – Goldgroup Mining Inc. (“Goldgroup” or the “Company”) (TSXV: GORO; NYSE American: GORO; FSE: 55G) is pleased to provide an update on the various technical studies, exploration programs and drilling activities underway across its four 100%-owned precious-metals assets in Mexico and the United States.

With two producing mines, the formerly producing San Francisco Gold Project and the advanced Back Forty development project, Goldgroup is simultaneously advancing a number of initiatives designed to strengthen its existing operations, expand and replace mineral resources, evaluate a potential restart at San Francisco and advance Back Forty toward a possible development decision.

​

Javier Reyes, Chairman and Chief Executive Officer of Goldgroup, commented, “There is a tremendous amount of work underway across Goldgroup with the Company having the advantage of four 100%-owned assets at different stages of the mining cycle, namely, production, development, exploration and discovery.”

​

At San Francisco, we are doing the technical work required to support a potential restart while our 26,000-metre drill program is generating new geological information and testing opportunities for resource growth. At Don David, we are drilling to replace and expand resources around our producing mines while advancing a number of highly prospective regional exploration targets. At Cerro Prieto, we are developing a plan to re-leach the existing leach pads and hopefully extend the asset life. And at Back Forty, our feasibility study is advancing one of the most significant development opportunities in the portfolio.

​

Importantly, these programs are not isolated initiatives. Together, they are designed to advance additional production opportunities, optimize existing operations, grow our resource base and extend mine lives. We believe this creates a strong foundation for Goldgroup’s next phase of growth.”

​

SAN FRANCISCO – DRILLING AND TECHNICAL STUDY SUPPORTING POTENTIAL RESTART

Goldgroup is advancing its 100%-owned San Francisco Gold Project in Sonora through an integrated drilling, technical and mine-planning program designed to evaluate the potential restart and optimization of the formerly producing open-pit operation.

​

The Company has a 26,000-metre diamond drilling program underway, the first significant new drilling campaign at San Francisco in many years.

The program has three principal objectives:

​

●Resource definition and geological confidence – improving the understanding of the geometry, continuity and grade distribution of known mineralization;

​


●Resource expansion – testing extensions of known mineralization and additional mineralized structures; and
●Mine planning and technical studies – generating geological, structural, geotechnical and other information required to evaluate potential restart scenarios.

​

As disclosed on September 8, 2026, the first results from the program have already demonstrated both higher-grade intervals and broader zones of gold mineralization within areas of known mineralization. Results are being incorporated into the Company's geological and resource models and technical work. Additional results are anticipated soon.

​

In parallel with drilling, Goldgroup is advancing a complete technical study and mine plan for San Francisco. The work is evaluating the potential restart and optimization of the operation and incorporates updated geological and resource information together with mine planning, geotechnical, metallurgical, processing, infrastructure, capital and operating-cost considerations.

The Company is also refurbishing existing processing infrastructure, including the crushing circuit and ADR plant, in preparation of a potential restart.

​

The current work is expected to provide an important technical foundation for a development decision regarding the potential restart of San Francisco.

DON DAVID – RESOURCE REPLACEMENT, RESOURCE GROWTH AND REGIONAL EXPLORATION

At the 100%-owned Don David Gold Mine complex in Oaxaca, Goldgroup continues to invest in drilling and exploration around its two producing underground mines, Arista and Alta Gracia.

During the first seven months of 2026, the Company completed approximately 25,726 metres of diamond drilling in 123 holes, including approximately 16,249 metres of infill drilling and 8,794 metres of expansion drilling. More than 97% of the program was directed toward resource definition and expansion.

​

This work is designed to:

​

●replace and expand mineral resources being converted into production;
●improve geological confidence and mine planning;
●test extensions of known mineralized structures;
●identify additional mineralized zones; and
●support the potential extension of mine lives.

Goldgroup is also advancing exploration across the broader Don David land package, which extends approximately 55 kilometres along the San José structural corridor.

​

Two of the most important regional exploration opportunities are Margaritas and El Rey.

Margaritas

Margaritas is located northwest of the Arista mine and hosts multiple epithermal gold-silver vein structures. Historical exploration has identified locally high-grade mineralization, and the Company believes the area warrants additional systematic exploration to better understand the scale, continuity and geometry of the mineralized system.

​

Goldgroup is evaluating the next phase of work at Margaritas, including additional drilling and geological work designed to test the broader exploration opportunity.

​


Graphic

El Rey

​

El Rey is located approximately 44 kilometres northwest of Arista along the San José structural corridor. Historical drilling identified high-grade gold and silver mineralization, providing a geological basis for further exploration.

The Company is working to design an exploration program to test and expand the mineralized system.

​

Goldgroup believes the combination of near-mine exploration around the producing operations and regional exploration across the broader land package provides multiple opportunities to replace resources consumed through mining while potentially identifying additional sources of future production.

CERRO PRIETO – RESOURCE EXPANSION AND MINE-LIFE OPPORTUNITIES

​

At the 100%-owned Cerro Prieto heap-leach gold mine in Sonora. Goldgroup continues to operate the mine while advancing technical work on a project to re-leach the existing heaps, in addition to exploration and development drilling designed to expand and improve its understanding of the mineral resource base.

​

The releaching project considers expanding the heap leach facilities and finer crushing of the existing heaps to recover un-leached gold. This project is supported by a sonic drilling program that is currently underway, which will provide direct samples of contained gold as well as provide material for additional leach testing. The sonic program is made up of 45 drillholes totaling 1,554 meters, of which 26 holes and 1,009 meters have been drilled.

The releaching project could add additional ounces to the end of the mine life of Cerro Prieto while testing additional targets along the trend.

​

BACK FORTY – FEASIBILITY STUDY UNDERWAY

At the 100%-owned Back Forty Project in Michigan's Upper Peninsula, Goldgroup continues to advance a comprehensive Feasibility Study for the gold-rich volcanogenic massive sulphide (“VMS”) project.

The feasibility work is evaluating the technical and economic parameters required to advance Back Forty toward a development decision, building on the project's existing technical work and 2023 Preliminary Economic Assessment.

The study encompasses the key components required for development planning, including mine design and scheduling, processing, infrastructure, metallurgy, environmental considerations, capital and operating costs and other technical and economic parameters.

​

Back Forty is envisioned as a combined open-pit and underground operation processing a polymetallic VMS deposit, with gold and silver as well as copper and zinc providing exposure to multiple metals.

The project represents an important longer-term development opportunity for Goldgroup and provides the Company with significant North American development optionality.

​


A PORTFOLIO OF PROJECTS AT DIFFERENT STAGES OF VALUE CREATION

Goldgroup's current work programs reflect the different stages and opportunities represented by its four 100%-owned assets:

​

Asset

Current Focus

Primary Objective

San Francisco

26,000-metre drilling + technical study + mine planning

Evaluate potential restart, optimize mine plan and test resource growth

Don David

Infill, expansion and regional exploration

Replace resources, expand resources and extend mine lives

Cerro Prieto

Resource expansion and development drilling

Grow resource base and identify mine-life opportunities

Back Forty

Feasibility Study

Advance project toward development decision

​

Graphic

​

Goldgroup believes this combination provides a balanced platform spanning current production, near-term production potential, exploration-driven growth and longer-term development.

​

The Company will continue to provide shareholders with updates as results from the various drilling programs are received and as the technical studies and development work advance.

Mr. Reyes added, “We want our shareholders to have a clear view of what is happening across the Company. There are multiple work streams underway, and each one is intended to grow production and increase asset value.

​

The coming months should be an important period for Goldgroup as drilling results are incorporated into our technical work, San Francisco moves closer to a restart decision, exploration advances across the Don David and Cerro Prieto districts, and the Back Forty feasibility study progresses.

​

Our objective is straightforward: build a larger, stronger and more diversified mining company by continuing to improve the assets we have while advancing the opportunities that can drive the next stage of growth.”

​


Graphic

Marketing Services Agreement

The Company also announces that it has entered into a digital marketing services agreement (the “Agreement”) with RELQO Medial LLC (“RELQO”), pursuant to which RELQO will provide the Company with digital marketing and investor awareness services for a period of 14 days. The services are expected to include the creation and distribution of digital advertising and investor awareness content through online platforms.

​

RELQO is a Wyoming-based digital marketing and investor awareness firm that provides marketing and promotional services to public companies, including digital advertising, content distribution and social media placement. RELQO and its principals are arm’s length to the Company and neither RELQO nor its principals currently have any direct or indirect interest in the securities of the Company, or any right or intention to acquire such an interest.

Under the Agreement, which is subject to the approval of the TSX Venture Exchange (the “TSXV”), the Company will pay RELQO a cash fee of US$120,000 for the campaign. The fee will be paid from the Company’s working capital, and no securities of the Company will be issued to RELQO as compensation for the services.

​

Qualified Person

​

The scientific and technical information contained in this news release was prepared under the supervision of and has been reviewed and approved by Christopher Richings, P.Eng, Vice President Technical Services of Goldgroup Mining Inc., a Qualified Person as defined by National Instrument 43-101. Mr. Richings is an employee of the Company and is not independent of the Company.

About Goldgroup

​

Goldgroup Mining Inc. is a precious-metals producer with four wholly owned assets in Mexico and the United States. The Company owns and operates the Don David Gold/Silver Mine in Oaxaca and the Cerro Prieto Gold Mine in Sonora, Mexico, and is advancing the San Francisco Gold Project in Sonora toward a potential production restart and is advancing the Back Forty Project in Michigan through permitting and feasibility. Goldgroup’s strategy is to build an intermediate mining company through production growth, exploration, mine optimization, project development and disciplined M&A. The Company is listed on the TSXV and NYSE American under the symbol “GORO” and on the Frankfurt Stock Exchange under the symbol “55G.” For more information, visit www.goldgroupmining.com.For additional information, please visit the Company's website at www.goldgroupmining.com.

​

For more information, visit www.goldgroupmining.com.

Contact

Goldgroup Mining Inc.

Javier Reyes

Chief Executive Officer jreyes@goldgroupmining.com

​

Sophia Shane

Corporate Development sshane@goldgroupmining.com 1 (604) 306-6867

www.goldgroupmining.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange accepts responsibility for the adequacy or accuracy of this news release.

​


Forward-Looking Statements:

This news release contains “forward-looking information” within the meaning of applicable Canadian securities laws and “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively, “forward-looking statements”). Forward-looking statements in this news release include, but are not limited to, statements regarding the advancement and potential restart of mining operations at the San Francisco Gold Project, including the timing, results and completion of the drilling program, technical study and mine plan, the refurbishment of existing processing infrastructure and a potential development decision; the incorporation of drilling results into the Company’s geological and resource models and the receipt of additional drilling results; the replacement and expansion of mineral resources and the potential extension of mine life at Don David and Cerro Prieto; planned exploration, drilling and other work programs at Don David, including at Margaritas and El Rey; the Cerro Prieto re-leaching project and its potential; the advancement of the Back Forty feasibility study; the receipt of TSXV approval of the Agreement and the services expected to be provided by RELQO thereunder; and the Company’s growth strategy.

​

Forward-looking statements are based on the Company’s current expectations, estimates, projections, assumptions and beliefs, including assumptions regarding the receipt and timing of required regulatory approvals; the Company’s ability to advance its existing projects, including to complete its planned drilling programs, technical studies and feasibility study on the anticipated timelines and budgets; the accuracy of the Company’s geological and resource interpretations; and the Company’s ability to retain sufficient liquidity to fund its planned work programs. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause actual results to differ materially, including the risks that required approvals, including TSXV approval of the Agreement, may not be obtained on acceptable terms or at all; market conditions may change; drilling results may not be consistent with expectations or support resource growth, the extension of mine life or a restart decision; technical studies and work programs, including the San Francisco technical study and mine plan, the Cerro Prieto re-leaching project and the Back Forty feasibility study, may be delayed, may not be completed as currently contemplated or may not support a development or restart decision; planned exploration programs may be delayed, modified or not completed; and the Company may be unable to advance, restart or develop projects as currently contemplated. Additional risks are described in the Company’s annual information form dated June 10, 2026 and other continuous disclosure documents available under the Company’s profile on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov. Any forward-looking statements in this news release are expressly qualified by this cautionary statement.

Although the Company believes that the expectations and assumptions reflected in its forward-looking statements are reasonable as of the date of this news release, no assurance can be given that they will prove to be correct. Readers should not place undue reliance on forward-looking statements. Forward-looking statements speak only as of the date of this news release, and the Company undertakes no obligation to update or revise them to reflect subsequent events or circumstances, except as required by applicable securities laws.

​


Exhibit 99.2

​

Graphic

NEWS RELEASE

GOLDGROUP MINING INTERSECTS 57.0 METERS AT 1.02 G/T GOLD AT LA CHICHARRA PIT, SAN FRANCISCO PROJECT

Including 4.75 meters grading 5.26 g/t gold, as the Company advances its 26,000-meter drilling program and technical studies supporting a potential restart.

Vancouver, Canada – November 09, 2026 – Goldgroup Mining Inc. (“Goldgroup” or the “Company”) (TSXV: GORO; NYSE American: GORO; FSE: 55G) is pleased to announce additional assay results from its ongoing 26,000-meter diamond drilling program at the formerly producing San Francisco Gold Project in Sonora, Mexico.

​

The latest results highlight broad zones of gold mineralization, including higher-grade intervals, within the La Chicharra Pit, one of two historically producing open pits at the San Francisco Project. These results follow the Company's September 8, 2026 announcement of initial drill results from the San Francisco Pit and highlight encouraging gold intercepts from a second principal mineralized area of the project.

​

The ongoing drilling program is providing important geological, structural and geotechnical information to refine the Company's geological and resource models, evaluate potential extensions of known mineralization, and support mine planning and technical studies assessing a potential restart and optimization of the San Francisco operation.

Results

The latest assay results from La Chicharra and the adjacent northwest pit area highlight broad zones of gold mineralization,

including localized higher-grade intervals. Significant results include:

​

●GGD-194: 57.0 meters grading 1.02 g/t gold, including 4.75 meters grading 5.26 g/t gold.
●GGD-204: 19.0 meters grading 1.49 g/t gold, including 3.80 meters grading 3.28 g/t gold.
●GGD-192: 16.50 meters grading 1.00 g/t gold, together with additional mineralized intervals of 14.72 meters grading

0.60 g/t gold and 15.90 meters grading 0.40 g/t gold.

●GGD-187: 16.22 meters grading 1.11 g/t gold.
●GGD-214: 9.58 meters grading 1.35 g/t gold, including 2.72 meters grading 3.82 g/t gold.

​

The results provide additional information on the distribution, grade and geometry of gold mineralization across the La Chicharra area. The results are being integrated with historical drilling and updated geological interpretations to refine the mineral resource models and support ongoing mine planning and technical studies.

​

Ongoing Drilling and Technical Studies

The Company continues to make significant progress with its 26,000-meter diamond drilling program at the San Francisco Gold Project. As of October 31, 2026, a total of 19,556 meters had been completed in 112 drill holes, representing approximately 75% of the planned program. Drilling activities accelerated during October, with approximately 7,121 meters completed during the month.

​


​

In parallel, Goldgroup has commissioned a geotechnical study to support final pit wall design criteria and engaged mine engineering support to evaluate alternative optimized pit configurations and resource shells under a range of gold-price and operating-cost assumptions. These studies will help assess potential mining scenarios and support the broader technical evaluation of a potential restart of operations.

Drilling and associated technical studies continue, with additional assay results to be reported as they become available.

​

Graphic

​

Figure 1 - San Francisco, La Chicharra Pits and Expansion Targets

​

​

“Javier Reyes, Chairman and Chief Executive Officer of Goldgroup, commented, “These results are particularly encouraging because they demonstrate broad gold mineralization at La Chicharra, including a substantial interval of 57 metres grading 1.02 g/t gold and a higher-grade interval within it. Importantly, this drilling is helping us build a more complete understanding of the mineralized system across both principal pit areas.

With approximately 75% of our 26,000-metre program completed, we are advancing the geological work alongside geotechnical and mine-planning studies that will help us evaluate the potential to optimize San Francisco and make a well-informed restart decision. Our focus is on establishing the technical foundation for a potential return to production while continuing to assess the project's broader resource and exploration opportunities.

In combination with the geotechnical and mine engineering studies, we are building a stronger foundation for a potential restart, while continuing to evaluate opportunities for longer-term resource growth.”

​


​

Drilling Results

The latest drilling results provide additional information on the distribution and grade of gold mineralization within the La Chicharra and San Francisco pit areas. The principal intercepts are discussed below in relation to their locations and geological significance, with particular emphasis on the new results from La Chicharra.

La Chicharra Pit

Drilling at La Chicharra has intersected several significant gold-bearing intervals, with the strongest results returned from drill

holes GGD-194 and GGD-204 in the southern portion of the pit.

GGD-194 returned 57.0 meters grading 1.02 g/t gold, including 4.75 meters grading 5.26 g/t gold, representing the broadest mineralized intercept among the results being reported in this release. Nearby drill hole GGD-204 intersected 19.0 meters grading 1.49 g/t gold, including 3.80 meters grading 3.28 g/t gold. Together, these results provide additional information on the distribution and grade of mineralization in the southern La Chicharra area.

Additional significant results were returned from other portions of the pit. GGD-192 intersected three separate mineralized intervals of 14.72 meters grading 0.60 g/t gold, 15.90 meters grading 0.40 g/t gold, and 16.50 meters grading 1.00 g/t gold. The deepest interval extends to the end of the hole at 148.0 meters, warranting further evaluation of the mineralization at depth.

In the northeastern portion of La Chicharra, GGD-187 returned 16.22 meters grading 1.11 g/t gold, while GGD-214, located in the adjacent northwest pit area, intersected 9.58 meters grading 1.35 g/t gold, including 2.72 meters grading 3.82 g/t gold.

Collectively, these results provide additional information on the distribution, grade and geometry of mineralization across the La Chicharra and northwest pit areas. The results are being evaluated alongside historical drilling, geological mapping and structural interpretations to refine the geological model and assess potential implications for mineral resource estimation and future mine planning.

Graphic

​

​

Figure 2 - La Chicharra pit drill-hole plan showing significant assay results

​


​

Graphic

​

Figure 3 – GGD-194 geological cross-section

​

Graphic

​

​

Figure 4 – GGD-201 and GGD-204 geological cross-section

​

​

San Francisco Pit

​


​

Additional drilling results from the San Francisco Pit complement the initial results reported in September 2026. These include

GGD-181, which intersected 35.5 meters grading 0.62 g/t gold, including several higher-grade intervals.

The results provide further information on the distribution and geometry of known mineralization within the San Francisco Pit and are being incorporated into updated geologic and resource models to support ongoing mine planning and evaluation of potential future pit configurations.

Table 1 – Selected Drill Results from the La Chicharra Pit Drilling

​

​

​

​

​

​

​

​

​

​

HOLE ID

LOCATION

AREA

FROM

(m)

TO

(m)

INTERVAL

(m)

ETW

(m)

Au

(g/t)

GGD-187

La Chicharra Pit

North-East Push

118.55

134.77

16.22

15.40

1.11

​

​

includes

120.13

122.23

2.10

1.99

2.92

​

​

includes

123.45

127.34

3.89

3.69

1.91

​

​

includes

130.42

130.92

0.50

0.47

3.45

​

​

includes

132.57

133.17

0.60

0.56

1.32

​

​

​

182.02

184.02

2.00

1.88

1.19

GGD-192

La Chicharra Pit

Deep Extension

73.22

87.94

14.72

13.83

0.60

​

​

includes

73.22

74.22

1.00

0.94

1.27

​

​

includes

85.15

86.50

1.35

1.26

1.50

​

​

​

101.55

117.45

15.90

14.94

0.40

​

​

includes

101.55

102.60

1.05

0.98

1.41

​

​

includes

107.18

108.90

1.72

1.61

1.08

​

​

​

131.50

148.00

16.50

15.51

1.00

​

​

includes

137.00

139.83

2.83

2.66

1.32

​

​

includes

142.48

147.30

4.82

4.53

1.73

GGD-194

La Chicharra Pit

Deep Extension

18.00

21.00

3.00

2.82

0.43

​

​

​

24.87

81.87

57.00

53.01

1.02

​

​

includes

24.87

26.10

1.23

1.14

3.28

​

​

includes

26.70

27.34

0.64

0.59

1.16

​

​

includes

30.99

31.77

0.78

0.72

1.09

​

​

includes

39.00

42.00

3.00

2.79

1.49

​

​

includes

46.35

47.76

1.41

1.31

1.20

​

​

includes

53.00

58.45

5.45

5.06

1.22

​

​

includes

67.75

69.34

1.59

1.47

2.00

​

​

includes

71.30

76.05

4.75

4.41

5.26

GGD-196

La Chicharra Pit

North-East Push

81.00

87.00

6.00

5.82

0.40

​

​

​

95.00

102.00

7.00

6.79

0.20

​

​

​

123.45

124.00

0.55

0.53

1.28

GGD-197

La Chicharra Pit

Deep Extension

51.30

60.80

9.50

9.31

0.54

​

​

includes

53.13

54.04

0.91

0.89

4.44

​

​

​

66.20

98.36

32.16

31.51

0.32

​

​

includes

82.00

98.36

16.36

16.03

0.43

​

​

includes

93.75

95.72

1.97

1.93

1.71

​

​

includes

96.68

97.84

1.16

1.13

1.19

​

​

​

104.50

107.00

2.50

2.45

0.70

​

​

Table 1 – Selected Drill Results from the La Chicharra Pit Drilling (Continued)

​


​

​

​

​

​

​

​

​

​

​

​

HOLE ID

LOCATION

AREA

FROM

(m)

TO

(m)

INTERVAL

(m)

ETW

(m)

Au

(g/t)

GGD-201

La Chicharra Pit

Deep Extension

22.48

67.00

44.52

42.29

0.40

​

​

includes

60.15

67.00

6.85

6.50

1.01

​

​

which includes

60.15

63.00

2.85

2.70

2.12

GGD-204

La Chicharra Pit

Deep Extension

25.25

29.00

3.75

3.60

0.20

​

​

​

64.40

66.00

1.60

1.53

1.19

​

​

​

86.00

105.00

19.00

18.24

1.49

​

​

includes

87.90

89.00

1.10

1.05

4.81

​

​

includes

94.60

98.40

3.80

3.64

3.28

​

​

includes

101.60

103.00

1.40

1.34

3.83

​

​

​

116.00

125.60

9.60

9.21

0.41

GGD-209

La Chicharra Pit

Deep Extension

9.60

11.60

2.00

1.86

0.64

​

​

​

15.30

19.78

4.48

4.16

0.37

GGD-211

La Chicharra Pit

North-west Exte

99.00

106.57

7.57

6.96

0.30

GGD-214

La Chicharra Pit

North-west Exte

88.14

97.72

9.58

9.29

1.35

​

​

includes

95.00

97.72

2.72

2.63

3.82

​

​


​

Table 2 – Selected Drill Results from the San Francisco Pit Drilling

​

​

​

​

​

​

​

​

​

​

​

HOLE ID

LOCATION

AREA

FROM

(m)

TO

(m)

INTERVAL

(m)

ETW

(m)

Au

(g/t)

GGD-180

San Francisco Pit

South Pushback

61.32

68.09

6.77

6.49

1.38

​

​

includes

61.32

62.69

1.37

1.31

1.44

​

​

includes

67.06

68.09

1.03

0.98

5.17

GGD-181

San Francisco Pit

South Pushback

53.00

88.50

35.50

34.60

0.62

​

​

includes

53.00

55.00

2.00

1.95

1.30

​

​

includes

56.75

58.00

1.25

1.21

6.73

​

​

includes

58.00

60.00

2.00

1.95

3.13

GGD-182

San Francisco Pit

South Pushback

27.62

28.54

0.92

0.84

1.30

​

​

​

37.29

40.03

2.74

2.52

2.95

​

​

includes

37.29

38.56

1.27

1.16

6.28

GGD-183

San Francisco Pit

Deep Extension

6.00

10.00

4.00

3.88

0.64

​

​

includes

6.00

8.00

2.00

1.94

1.18

​

​

​

30.50

39.20

8.70

8.43

0.25

​

​

​

52.15

54.85

2.70

2.61

0.65

​

​

includes

53.50

54.85

1.35

1.30

1.09

​

​

​

78.83

84.15

5.32

5.16

0.28

​

​

​

86.25

88.36

2.11

2.04

0.34

​

​

​

91.97

106.20

14.23

13.80

0.89

​

​

includes

96.00

98.43

2.43

2.35

4.16

​

​

includes

104.02

105.00

0.98

0.95

1.21

​

​

​

114.00

121.50

7.50

7.27

0.57

​

​

includes

117.65

118.15

0.50

0.48

3.81

​

​

​

124.50

137.55

13.05

12.70

0.36

​

​

​

139.30

156.65

17.35

16.82

0.25

​

​

includes

140.35

140.85

0.50

0.48

1.13

GGD-184

San Francisco Pit

South Pushback

1.50

3.00

1.50

1.44

1.39

​

​

​

15.00

18.25

3.25

3.12

0.52

​

​

includes

15.00

15.50

0.50

0.48

1.03

​

​

​

26.54

36.32

9.78

9.38

1.24

​

​

includes

29.42

31.53

2.11

2.02

5.18

​

​

​

64.65

72.00

7.35

7.05

0.97

​

​

includes

68.84

72.00

3.16

3.03

2.07

​

​

​

87.00

91.00

4.00

3.84

0.39

​

​

​

112.73

115.00

2.27

2.17

1.93

​

​


​

Table 2 – Selected Drill Results from the San Francisco Pit Drilling (Continued)

​

​

​

​

​

​

​

​

​

​

​

HOLE ID

LOCATION

AREA

FROM

(m)

TO

(m)

INTERVAL

(m)

ETW

(m)

Au

(g/t)

GGD-185

San Francisco Pit

South Pushback

27.14

37.00

9.86

9.46

0.35

​

​

includes

27.14

28.00

0.86

0.82

1.06

GGD-186

San Francisco Pit

South Pushback

16.50

23.45

6.95

5.97

0.83

​

​

includes

22.73

23.45

0.72

0.61

5.91

​

​

​

49.50

59.30

9.80

8.42

0.53

​

​

includes

49.50

51.50

2.00

1.72

1.72

​

​

​

66.20

80.00

13.80

11.86

0.25

​

​

includes

66.20

67.25

1.05

0.90

1.07

GGD-188

San Francisco Pit

Deep Extension

8.75

21.00

12.25

12.00

0.21

​

​

​

68.00

77.40

9.40

9.21

0.24

​

​

​

112.38

136.75

24.37

23.88

0.28

​

​

includes

114.00

114.97

0.97

0.95

1.03

​

​

includes

135.00

136.75

1.75

1.71

1.03

​

​

​

141.20

159.00

17.80

17.44

0.73

​

​

includes

158.20

159.00

0.80

0.78

10.45

​

​

​

176.10

189.60

13.50

13.23

0.36

​

​

includes

181.92

182.72

0.80

0.78

2.04

​

​

​

196.22

199.36

3.14

3.07

0.30

GGD-191

San Francisco Pit

Deep Extension

4.70

14.65

9.95

9.05

0.62

​

​

includes

7.72

9.00

1.28

1.16

1.74

​

​

​

19.41

27.15

7.74

7.04

0.92

​

​

includes

21.05

21.93

0.88

0.80

1.86

​

​

includes

24.75

26.25

1.50

1.36

2.16

​

​

​

98.32

109.45

11.13

10.12

0.46

​

​

includes

101.92

102.55

0.63

0.57

2.04

​

​

includes

107.30

108.30

1.00

0.91

2.37

​

​

​

118.10

124.15

6.05

5.50

0.59

​

​

includes

120.45

122.20

1.75

1.59

1.20

​

​

​

128.74

133.95

5.21

4.74

0.53

​

​

includes

132.20

132.70

0.50

0.45

1.49

​

​

​

153.92

171.10

17.18

15.60

0.21

​

​


​

Table 3 – Drill-Hole Collar and Orientation Information

​

Hole ID

Northing

(m UTM)

Easting

(m UTM)

Elevation

(m ASL)

Azimuth (°)

Dip (°)

Total Depth

(m)

GGD-180

3,357,584.85

488,137.60

679.95

210°

-85°

90.00

GGD-181

3,357,464.97

488,381.75

631.35

210°

-85°

90.00

GGD-182

3,357,563.43

488,239.64

649.30

210°

-85°

110.00

GGD-183

3,357,652.07

488,952.10

494.94

210°

-70°

178.00

GGD-184

3,357,544.44

488,272.60

643.72

210°

-65°

118.65

GGD-185

3,357,507.89

488,209.59

649.96

215°

-75°

80.00

GGD-186

3,357,520.62

488,308.53

638.06

0°

-90°

135.00

GGD-187

3,358,140.78

486,963.84

709.44

205°

-70°

216.00

GGD-188

3,357,705.75

488,959.06

502.96

210°

-75°

201.00

GGD-191

3,357,625.23

489,074.11

517.68

205°

-75°

210.00

GGD-192

3,357,997.68

486,830.90

615.34

205°

-70°

148.00

GGD-194

3,357,885.52

486,900.38

595.79

205°

-55°

100.00

GGD-196

3,358,085.09

486,981.56

704.11

205°

-70°

130.00

GGD-197

3,358,060.73

486,728.49

605.77

205°

-70°

121.25

GGD-201

3,357,854.47

486,930.98

595.04

205°

-55°

100.00

GGD-204

3,357,869.86

486,949.11

596.70

205°

-70°

129.00

GGD-209

3,358,071.96

486,637.15

595.10

205°

-60°

63.00

GGD-211

3,358,198.81

486,329.42

694.71

205°

-70°

137.50

GGD-214

3,358,227.10

486,474.77

697.79

205°

-70°

156.00

​

Note: coordinate datum and projection NAD27 / UTM Zone 12N

​

​

Geological Interpretation

Gold mineralization at the San Francisco Project is associated with a structurally controlled system developed within intrusive and metamorphic rocks. Mineralization at the San Francisco Pit is predominantly associated with leucocratic granite and related structures, whereas mineralization at La Chicharra is principally hosted within strongly sheared and altered gabbro, where gold occurs in association with quartz veins, veinlets and pegmatite lenses.

Historical geological interpretations describe the mineralized gabbroic body at La Chicharra as a northwest-striking, northeast-dipping tabular unit, with dips generally ranging from 30° to 40°. Mineralization has historically been interpreted as having potential extensions along strike and down dip. The latest drilling results, particularly the broad intercepts encountered in GGD-194 and GGD-204, provide additional information to evaluate the geometry, grade distribution and continuity of mineralization within this geological framework.

The Company is integrating these results with historical drilling, geological pit mapping and structural interpretations to refine the geological and resource models, assess potential extensions of known mineralization and support future planning.

Reported drill intercept lengths are downhole core lengths; estimated true widths are provided in Tables 1 and 2. Reported

gold grades are uncapped.

​


​

Geotechnical and Mine Planning Studies

In parallel with the drilling program, Goldgroup has commissioned a geotechnical study to evaluate pit wall stability and develop slope design criteria for potential future mining operations at the San Francisco Project.

The Company has also engaged mine engineering support to evaluate alternative open-pit configurations and optimized pit shells under a range of gold price and operating-cost assumptions. This work will help assess potential mining scenarios and opportunities for pit optimization.

These studies, together with the updated geological and mineral resource models, will contribute to the broader technical evaluation of a potential restart for the San Francisco operation.

Ongoing Drilling and Next Steps

With approximately 75% of the planned 26,000-meter diamond drilling program completed as of October 31, 2026, drilling continues within and around the San Francisco and La Chicharra pits. Additional assay results are expected as the remaining drilling progresses.

The Company will continue integrating new drilling results with historical geological and structural information to refine its geological and resource models. This work, together with the ongoing geotechnical and mine-planning studies, will support the evaluation of potential pit optimization, mineral resource development and a possible restart of operations.

Beyond the immediate restart evaluation, Goldgroup continues to assess brownfield and regional exploration opportunities across the broader San Francisco property. The improved geological and structural understanding developed through the current program will help guide future exploration targeting and prioritization.

About Goldgroup Mining Inc.

Goldgroup Mining Inc. is a precious-metals producer with four wholly owned assets in Mexico and the United States. The Company owns and operates the Don David Gold/Silver Mine in Oaxaca and the Cerro Prieto Gold Mine in Sonora, Mexico, and is advancing the San Francisco Gold Project in Sonora toward a potential production restart and is advancing the Back Forty Project in Michigan through permitting and feasibility. Goldgroup’s strategy is to build an intermediate mining company through production growth, exploration, mine optimization, project development and disciplined M&A. The Company is listed on the TSXV and NYSE American under the symbol “GORO” and on the Frankfurt Stock Exchange under the symbol “55G.” For more information, visit www.goldgroupmining.com.

Qualified Person

The scientific and technical information contained in this news release was prepared under the supervision of and has been reviewed and approved by Christopher Richings, P.Eng, Vice President Technical Services of Goldgroup Mining Inc., a Qualified Person as defined by National Instrument 43-101. Mr. Richings is an employee of the Company and is not independent of the Company.

Quality Assurance, Quality Control and Data Verification

All drill core samples reported in this release were collected under the supervision of qualified geological personnel at the San Francisco project site. Drill core was logged, photographed, marked for sampling and typically halved using a diamond saw. Sample security and chain-of-custody procedures were maintained from the drill site through delivery to the analytical laboratory. The quality assurance and quality control program included the regular insertion of certified reference materials, blanks and duplicate samples.

​


​

All selected results presented in Tables 1 and 2 and throughout this release are based on analyses performed by ALS Global (Vancouver, BC, Canada), an independent laboratory accredited to ISO/IEC 17025:2017. The Company maintains a rigorous QA/QC program, including the insertion of certified reference materials, blanks, and duplicates, to monitor assay accuracy and precision across both laboratories.

Samples were prepared at ALS Global in Hermosillo, Mexico and analyzed at ALS Global in Vancouver, Canada, an independent laboratory accredited to ISO/IEC 17025:2017 and ISO 9001:2015. At ALS, gold was analyzed using a 30- gram fire assay with an atomic absorption spectroscopy finish.

Cautionary Notes Regarding Forward-Looking Information

Certain statements contained in this news release constitute "forward-looking information" within the meaning of applicable Canadian securities law and "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and are intended to be covered by the safe-harbour provisions of applicable Canadian and United States securities laws. Forward-looking statements relate to analyses and other information that are based on forecasts of future results, as well as estimates and assumptions of management.

These forward-looking statements reflect Goldgroup's current internal projections, expectations or beliefs and are based on information currently available to Goldgroup. In some cases, forward-looking information can be identified by terminology such as "may," "will," "should," "expect," "intend," "plan," "anticipate," "believe," "estimate," "projects," "potential," "scheduled," "forecast," "budget" or the negative of those terms or other comparable terminology. Such forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements.

Forward-looking information in this news release includes, but is not limited to, statements regarding the continuation, completion, scope, objectives and anticipated benefits of the drilling program at San Francisco; the timing and receipt of additional assay results; the interpretation and use of drilling, geological, structural, geotechnical and assay information; the incorporation of drilling results into geological, structural and resource models, resource evaluations and mine plans; the potential definition, expansion or increased confidence of mineral resources; the identification of extensions, parallel structures, additional mineralized zones and district-scale or regional exploration targets; the timing, scope, cost and completion of technical studies, including the anticipated completion of the broader technical study in Q4 2026; the Company's anticipated expenditure on the drilling program; future pit design, pushbacks, mine planning and technical work; the potential refurbishment of the crushing circuit and ADR plant; the potential restart, optimization and future operation of the San Francisco Project, including the possibility of a restart in Q1 2027; the availability and suitability of existing infrastructure; future exploration and development activities; future operational and development milestones; and the Company's growth strategy and objectives.

Forward-looking information is based on a number of assumptions that management believes are reasonable as of the date of this news release, including assumptions regarding: the accuracy and reliability of assay results, geological data and interpretations; the geological continuity and grade of mineralization; the timely receipt of assay results; the successful completion of drilling and technical work on the anticipated schedule and budget; the availability of financing, personnel, equipment, contractors, laboratory capacity and other resources; the condition, capacity and suitability of existing infrastructure; the availability of water, power and other operating inputs; the ability to obtain and maintain required permits, licenses and regulatory approvals; prevailing and future commodity prices, exchange rates and capital and operating costs; the absence of material adverse changes in political, regulatory, environmental, social, security, market or operating conditions, and the Company's ability to execute its exploration, development and operating plans.

​


​

Forward-looking information is subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to materially differ from those reflected in the forward-looking information, including, risks relating to risks inherent in mineral exploration, resource estimation, technical studies, mine development and the restart of mining operations; uncertainty regarding geological interpretations, mineralization, grade, continuity and estimated true widths; the possibility that drilling results will not support resource expansion, increased resource confidence or future mine plans; delays in receiving assay results or completing drilling, modelling, engineering or other technical work; the possibility that the technical study will not support a restart or will identify additional work, capital requirements or operating costs; uncertainty regarding the timing, scope, cost and outcome of plant refurbishment; the availability and terms of financing; fluctuations in gold prices, and exchange rates and input costs. Additional information regarding these and other risk factors and uncertainties is disclosed in Goldgroup's annual information form dated June 10, 2026, and other continuous disclosure materials available under the Company's profile on SEDAR+ at www.sedarplus.ca. Any and all of the forward-looking information contained in this news release is qualified by these cautionary statements.

Although Goldgroup believes that the forward-looking information contained in this news release is based on reasonable assumptions, readers cannot be assured that actual results will be consistent with such statements. Accordingly, readers are cautioned against placing undue reliance on forward-looking information. Goldgroup expressly disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, events or otherwise, except as may be required by, and in accordance with, applicable securities laws.

​

ON BEHALF OF THE BOARD OF DIRECTORS

​

Javier Reyes

Chairman and Chief Executive Officer

Goldgroup Mining Inc.

​

Contact

Goldgroup Mining Inc.
Javier Reyes

Chief Executive Officer jreyes@goldgroupmining.com

​

Sophia Shane

Corporate Development sshane@goldgroupmining.com
1 (604) 306-6867

www.goldgroupmining.com

​

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

​


​

Exhibit 99.3

​

​

Graphic

NOTICE

​

​

​

RE:

CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2026 AND 2025

​

The third quarter financial statements for the three and nine months ended September 30, 2026 and 2025 have not been reviewed by the auditors of Goldgroup Mining Inc.

​

​

​

​

Goldgroup Mining Inc.

​

“Chet Holyoak”

​

Chet Holyoak

​

Chief Financial Officer

​

​

​

​

​


Graphic

​

Goldgroup Mining Inc.

​

Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(unaudited and expressed in thousands of US dollars, except where indicated)

​

​


Goldgroup Mining Inc.

Condensed Interim Consolidated Statements of Financial Position

As of September 30, 2026 and December 31, 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

​

​

​

​

​

​

​

​

​

​

  ​

Note

  ​

  ​ ​

September 30,
2026

  ​

  ​

December 31,
2025

Assets

​

​

​

​

​

​

​

​

​

​

Current assets

​

​

​

​

​

​

​

​

​

​

Cash and cash equivalents

​

4

​

​

$

168,388

​

​

$

9,611

Accounts Receivable

​

4

​

​

​

6,593

​

​

​

-

Prepaid expenses and Other Current Assets

​

​

​

​

10,488

​

​

​

2,798

Inventory

​

5

​

​

​

17,459

​

​

​

16,176

Assets held for sale

​

10

​

​

​

-

​

​

​

5,423

​

​

​

​

​

202,928

​

​

​

34,008

Receivables

​

​

​

​

-

​

​

​

1,807

Property, Plant, and Equipment

​

6

​

​

​

116,663

​

​

​

20,378

Mineral interest

​

8

​

​

​

329,505

​

​

​

13,946

Exploration and evaluation assets

​

​

​

​

2,588

​

​

​

1,489

Other non-current assets

​

​

​

​

1,776

​

​

​

36

Total assets

​

​

​

$

653,460

​

​

$

71,664

Liabilities

​

​

​

​

​

​

​

​

​

​

Current liabilities

​

​

​

​

​

​

​

​

​

​

Accounts payable and accrued liabilities

​

4

​

​

$

52,358

​

​

$

25,212

Warrant liability

​

12

​

​

​

18,971

​

​

​

45,992

Deposit received on proceeds of sale

​

10

​

​

​

-

​

​

​

2,445

Liabilities held for sale

​

10

​

​

​

-

​

​

​

422

Mining royalty and income taxes payable

​

21

​

​

​

7,820

​

​

​

251

Current portion of gold and silver stream liabilities

​

20

​

​

​

108,900

​

​

​

-

​

​

​

​

​

188,049

​

​

​

74,322

Royalty payable

​

4

​

​

​

3,377

​

​

​

4,033

Deferred income tax liabilities

​

21

​

​

​

81,654

​

​

​

-

Decommissioning obligations

​

​

​

​

17,105

​

​

​

8,446

Other non-current liabilities

​

​

​

​

5,230

​

​

​

28

Total liabilities

​

​

​

​

295,415

​

​

​

86,829

Shareholders’ equity (deficiency)

​

​

​

​

​

​

​

​

​

Share capital

​

​

​

​

564,898

​

​

​

198,909

Contingent share consideration

​

​

​

​

3,305

​

​

​

3,305

Reserves

​

​

​

​

26,799

​

​

​

9,613

Deficit

​

​

​

​

(236,957)

​

​

​

(226,992)

Total shareholders’ equity (deficiency)

​

​

​

​

358,045

​

​

​

(15,165)

Total liabilities and shareholders’ equity (deficiency)

​

​

​

$

653,460

​

​

$

71,664

​

Nature of operations and going concern (note 1), Commitments (note 16), Subsequent events (note 23)

​

​

​

Approved by the Board of Directors

​

​

“Lila Manassa Murphy”

​

Director

“Javier Reyes”

​

Director

​

​

​

The accompanying notes are an integral part of these condensed interim consolidated financial statements


Goldgroup Mining Inc.

Condensed Interim Consolidated Statements of Income (Loss)

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated)

​

​

​

​

​

​

​

Three months ended Sept. 30,

​

​

Nine months ended Sept. 30,

​

​

​

​

Note

​

​

2026

​

​

2025

​

​

2026

​

​

2025

​

Sales, Net

  ​

  ​

​

  ​

  ​

$

57,060

  ​

  ​

$

3,707

  ​

  ​

$

99,361

  ​

  ​

$

13,651

 

Cost of Sales

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Production Costs

​

​

​

​

​

​

(38,904)

​

​

​

(6,105)

​

​

​

(72,038)

​

​

​

(12,335)

​

Depreciation and Depletion Expense

​

​

​

​

​

​

(32,398)

​

​

​

(142)

​

​

​

(33,246)

​

​

​

(494)

​

Reclamation and Remediation Expense

​

​

​

​

​

​

(674)

​

​

​

-

​

​

​

(674)

​

​

​

-

​

Mine Gross Profit (Loss)

​

​

​

​

​

​

(14,916)

​

​

​

(2,540)

​

​

​

(6,597)

​

​

​

822

​

Share-based compensation

​

​

13

​

​

​

(2,873)

​

​

​

(2)

​

​

​

(2,873)

​

​

​

(33)

​

General and administrative

​

​

​

​

​

​

(3,113)

​

​

​

(2,233)

​

​

​

(10,112)

​

​

​

(4,301)

​

Care and maintenance – San Francisco

​

​

​

​

​

​

475

​

​

​

-

​

​

​

(2,067)

​

​

​

-

​

Exploration expense

​

​

​

​

​

​

(805)

​

​

​

-

​

​

​

(966)

​

​

​

-

​

Impairment

​

​

10

​

​

​

(2,000)

​

​

​

-

​

​

​

(2,000)

​

​

​

(27,648)

​

Unrealized derivative gain (loss) – warrant liability

​

​

12

​

​

​

16,153

​

​

​

(413)

​

​

​

18,980

​

​

​

(16,156)

​

Other (expense) income

​

​

​

​

​

​

(6,260)

​

​

​

419

​

​

​

(6,116)

​

​

​

200

​

Profit (loss) before income taxes

​

​

​

​

​

​

(13,339)

​

​

​

(4,769)

​

​

​

(11,751)

​

​

​

(47,116)

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Income tax (expense) benefit

​

​

21

​

​

​

3,102

​

​

​

(4)

​

​

​

1,786

​

​

​

-

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Net Loss

​

​

​

​

​

$

(10,237)

​

​

$

(4,773)

​

​

$

(9,965)

​

​

$

(47,116)

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Loss per share – Basic

​

​

22

​

​

$

(0.08)

​

​

$

(0.07)

​

​

$

(0.11)

​

​

$

(0.90)

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Loss per share – Diluted

​

​

22

​

​

$

(0.20)

​

​

$

(0.07)

​

​

$

(0.30)

​

​

$

(0.90)

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Weighted average shares outstanding (000’s)

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Basic

​

​

22

​

​

​

127,150

​

​

​

70,018

​

​

​

92,048

​

​

​

52,536

​

Diluted

​

​

22

​

​

​

132,175

​

​

​

70,018

​

​

​

98,940

​

​

​

52,536

​

Total shares issued and outstanding (000’s)

​

​

​

​

​

​

168,997

​

​

​

72,899

​

​

​

168,997

​

​

​

72,899

​

​

​

​

​

The accompanying notes are an integral part of these condensed interim consolidated financial statements


Goldgroup Mining Inc.

Condensed Interim Consolidated Statements of Cash Flows

For the nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Nine months ended Sept. 30,

​

​

​

​

Note

​

​

​

2026

​

​

​

2025

​

Cash flows provided by (used in) operating activities

  ​

  ​

  ​

  ​

​

​

  ​

  ​

  ​

​

 

Net loss for the period

​

​

​

​

$

(9,965)

​

​

$

(47,116)

​

Adjustments to reconcile net loss:

​

​

​

​

​

​

​

​

​

​

​

Depreciation and amortization

​

​

​

​

​

7,513

​

​

​

258

​

Depletion

​

​

​

​

​

26,046

​

​

​

38

​

Deferred taxes

​

​

21

​

​

​

(9,769)

​

​

​

-

​

Share-based compensation

​

​

13

​

​

​

2,873

​

​

​

33

​

Finance cost - ARO

​

​

​

​

​

390

​

​

​

89

​

Impairment of exploration and evaluation property

​

​

​

​

​

-

​

​

​

27,648

​

Write-off of notes receivables

​

​

​

​

​

2,000

​

​

​

​

​

Inventory Reserve

​

​

​

​

​

(1,091)

​

​

​

-

​

Gain in settlement of AP

​

​

​

​

​

(62)

​

​

​

-

​

Accretion on Gold Royalty

​

​

​

​

​

1,273

​

​

​

-

​

Foreign exchange

​

​

​

​

​

91

​

​

​

(4)

​

Gold and silver streaming liability

​

​

​

​

​

2,500

​

​

​

-

​

Derivative – warrant

​

​

12

​

​

​

(18,980)

​

​

​

16,156

​

Accretion - lease

​

​

​

​

​

6

​

​

​

3

​

​

​

​

​

​

​

2,825

​

​

​

(2,895)

​

Change in working capital

​

​

​

​

​

​

​

​

​

​

​

Increase in accounts receivables

​

​

​

​

​

(8,073)

​

​

​

(1,983)

​

Decrease (increase) in inventory

​

​

​

​

​

15,230

​

​

​

(6,823)

​

Prepaid expenses and other assets

​

​

​

​

​

(591)

​

​

​

-

​

Decrease in accounts payable and accrued liabilities

​

​

​

​

​

(56)

​

​

​

(178)

​

Mining royalty and income taxes payable/receivable

​

​

​

​

​

4,543

​

​

​

-

​

Other non-current assets & liabilities

​

​

​

​

​

(1,007)

​

​

​

-

​

Total cash flow provided by (used in) operating activities

​

​

​

​

​

12,871

​

​

​

(11,879)

​

Cash flows provided by (used in) financing activities

​

​

​

​

​

​

​

​

​

​

​

Proceeds on warrant exercises

​

​

12

​

​

​

1,968

​

​

​

2,663

​

Proceeds received for private placement

​

​

12

​

​

​

121,845

​

​

​

29,869

​

Share issuance costs

​

​

​

​

​

(4,310)

​

​

​

-

​

Tax paid on net settlement of RSUs

​

​

​

​

​

(658)

​

​

​

​

​

Proceeds from option exercises

​

​

13

​

​

​

159

​

​

​

48

​

Lease payments

​

​

​

​

​

(19)

​

​

​

(9)

​

Total cash flow provided by financing activities

​

​

​

​

​

118,985

​

​

​

32,571

​

Cash flows provided by (used in) investing activities

​

​

​

​

​

​

​

​

​

​

​

Purchase of property, plant and equipment

​

​

6

​

​

​

(11,449)

​

​

​

(2,795)

​

Cash and cash equivalents acquired on acquisition of Gold Resource

​

​

19

​

​

​

42,617

​

​

​

-

​

Exploration

​

​

​

​

​

(4,759)

​

​

​

(1,003)

​

Molimentales receivable

​

​

​

​

​

-

​

​

​

(3,740)

​

Acquisition costs, net of cash received - Pinos

​

​

​

​

​

-

​

​

​

(74)

​

Pinos sale proceeds

​

​

10

​

​

​

550

​

​

​

-

​

Total cash flow provided by (used in) Investing

​

​

​

​

​

26,959

​

​

​

(7,612)

​

Foreign exchange impact on cash

​

​

​

​

​

(38)

​

​

​

-

​

Increase (decrease) in cash and cash equivalents

​

​

​

​

​

158,777

​

​

​

13,080

​

Cash and cash equivalents – beginning of period

​

​

​

​

​

9,611

​

​

​

366

​

​

​

​

​

​

​

​

​

​

​

​

​

Cash and cash equivalents – end of period

​

​

​

​

$

168,388

​

​

$

13,446

​

​

Supplemental cash flow information (note 18)

​

​

​

The accompanying notes are an integral part of these condensed interim consolidated financial statements


Goldgroup Mining Inc.

Condensed Interim Consolidated Statements of Changes in Shareholders’ Equity (Deficiency)

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

  ​

  ​

Notes

  ​

  ​

Shares
(‘000)

  ​

  ​

Share
capital

  ​

  ​

Contingent
shares
consideration

  ​

  ​

Share-based
compensation
and warrant
reserves

  ​

  ​

Equity
portion of
convertible
debt

  ​

  ​

Foreign
currency
translation
reserves

  ​

  ​

Deficit

  ​

  ​

Total
equity
(deficiency)

 

January 1, 2026

​

​

  ​

​

​

73,129

​

​

$

198,909

​

​

$

3,305

​

​

$

9,917

​

​

$

4

​

​

$

(308)

​

​

$

(226,992)

​

​

$

(15,165)

​

Income (loss) for the period

​

​

  ​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

(9,965)

​

​

​

(9,965)

​

Exercise of stock options

​

​

13

​

​

856

​

​

​

314

​

​

​

-

​

​

​

(155)

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

159

​

Exercise of warrants

​

​

12

​

​

2,222

​

​

​

10,024

​

​

​

-

​

​

​

(14)

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

10,010

​

Shares issued on acquisition of Gold Resource

​

​

19

​

​

59,132

​

​

​

251,070

​

​

​

-

​

​

​

1,715

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

252,785

​

Conversion of cash-settled PSUs to equity-settled RSUs

​

​

  ​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

629

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

629

​

Private placement

​

​

12

​

​

33,382

​

​

​

102,719

​

​

​

-

​

​

​

14,816

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

117,535

​

Share-based compensation

​

​

13

​

​

-

​

​

​

-

​

​

​

-

​

​

​

2,715

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

2,715

​

RSUs settled in common shares

​

​

13

​

​

276

​

​

​

1,862

​

​

​

-

​

​

​

(2,520)

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

(658)

​

Balance at September 30, 2026

​

​

  ​

​

​

168,997

​

​

$

564,898

​

​

$

3,305

​

​

$

27,103

​

​

$

4

​

​

$

(308)

​

​

$

(236,957)

​

​

$

358,045

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Notes

​

​

Shares
(‘000)

​

​

​

Share
capital

​

​

​

Contingent
shares
consideration

​

​

​

Share-based
compensation
and warrant
reserves

​

​

​

Equity
portion of
convertible
debt

​

​

​

Foreign
currency
translation
reserves

​

​

​

Deficit

​

​

​

Total
equity
(deficiency)

​

January 1, 2025

​

​

  ​

​

​

25,356

​

​

$

138,277

​

​

$

3,305

​

​

$

8,968

​

​

$

4

​

​

$

(308)

​

​

$

(158,612)

​

​

$

(8,366)

​

Loss for the period

​

​

  ​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

(47,116)

​

​

​

(47,116)

​

Private placement, net

​

​

  ​

​

​

27,009

​

​

​

18,176

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

18,176

​

Share issuance costs

​

​

12

​

​

674

​

​

​

(1,864)

​

​

​

-

​

​

​

1,172

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

(692)

​

Share-based compensation

​

​

13

​

​

-

​

​

​

-

​

​

​

-

​

​

​

33

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

33

​

Exercise of stock options

​

​

13

​

​

416

​

​

​

92

​

​

​

-

​

​

​

(44)

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

48

​

Exercise of warrants

​

​

12

​

​

6,765

​

​

​

7,343

​

​

​

-

​

​

​

(206)

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

7,137

​

Shares issued on Pinos acquisition

​

​

10

​

​

12,679

​

​

​

35,962

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

35,962

​

Balance at September 30, 2025

​

​

  ​

​

​

72,899

​

​

$

197,986

​

​

$

3,305

​

​

$

9,923

​

​

$

4

​

​

$

(308)

​

​

$

(205,728)

​

​

$

5,182

​

​

​

​

​

The accompanying notes are an integral part of these condensed interim consolidated financial statements


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

1

Nature of operations and going concern

​

Nature of operations

Goldgroup Mining Inc. is the parent company of its consolidated group ("Goldgroup'' or the "Company''). Its head office is located at Suite 410 – 1111 Melville St., Vancouver BC, V6E 3V6. On July 17, 2026, the Company completed its acquisition of Gold Resource Corporation ("Gold Resource" or "GRC") (Note 19). Following the acquisition, the Company owns the producing Cerro Prieto project in Sonora, Mexico, the producing Don David Gold Mine ("DDGM") in Oaxaca, Mexico, the Back Forty development project in Michigan, United States, and the San Francisco project in Sonora, Mexico. The Company is listed on the TSX Venture Exchange and the NYSE American under the trading symbol "GORO".

​

Going Concern

The Company has experienced recurring operating losses and has an accumulated deficit of $236,957 as at September 30, 2026. However, as at September 30, 2026, the Company has a working capital of $14,879. Working capital is defined as current assets less current liabilities and provides a measure of the Company’s ability to settle liabilities that are due within one year with assets that are also expected to be converted into cash within one year.

​

In assessing the Company's ability to continue as a going concern, management has considered the anticipated contribution of operating cash flows from the post-merger combined group's expanded portfolio of producing mines. Notwithstanding the completion of the merger, the Company continues to have an accumulated deficit and a history of recurring operating losses, and management's ability to fund the combined group's operations, service its obligations as they come due, and advance its planned work programs remains dependent on its ability to generate future profitable operations and/or obtain the necessary financing to conduct its planned work program on its mineral properties, meet its on-going levels of corporate overhead and commitments, keep its properties in good standing and discharge its liabilities as they come due.

​

Material uncertainties may cast significant doubt about the Company’s ability to continue as a going concern. These condensed interim consolidated financial statements do not include any adjustments that would be necessary if the going concern assumption were not appropriate. If the going concern basis was not appropriate for these condensed interim consolidated financial statements, then adjustments would be necessary in the carrying value of assets and liabilities, the reported revenues and expenses, and the classifications used in the statement of financial position.

​

Recent global issues, including political conflict in other regions, have adversely affected workplaces, economies, supply chains, and financial markets globally. It is not possible for the Company to predict the duration or magnitude of the adverse results of these issues and their effects on the Company's business or results of operations at this time.

​

Share consolidation

On July 10, 2026, the Company completed a share consolidation on the basis of one (1) new common share for every four (4) previously outstanding common shares.  All share, per share, stock option, and warrant information has been retrospectively restated in these condensed interim consolidated financial statements to reflect this share consolidation.

​

2

Basis of presentation and material accounting policy information

​

These condensed interim consolidated financial statements have been prepared in accordance with IAS 34 – Interim Financial Reporting as issued by the International Accounting Standards Board (“IASB”). Accordingly, certain disclosures included in annual financial statements prepared in accordance with IFRS Accounting Standards (“IFRS”) as issued by the IASB have been condensed or omitted and these condensed interim consolidated financial statements should be read in conjunction with the Company’s audited consolidated financial statements for the year ended December 31, 2025. Certain prior period amounts have been reclassified to conform to the current period presentation. These reclassifications had no effect on previously reported net income, total assets, total liabilities, or stockholders' equity.

​

The accounting policies applied in these condensed interim consolidated financial statements are consistent with those applied and disclosed in the Company’s audited financial statements for the year ended December 31, 2025, except for the new accounting policies described below.

​

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

The Company’s interim results are not necessarily indicative of its results for a full year. These condensed interim consolidated financial statements were approved by the Board of Directors on November 16, 2026.

​

New accounting policies

The following accounting policies became relevant to the Company following the acquisition of Gold Resource Corporation on July 17, 2026.

​

Business combinations

Business combinations are accounted for using the acquisition method when control is transferred to the Company. The consideration transferred is measured at fair value, as are the identifiable assets acquired and liabilities assumed, subject to the measurement exceptions in IFRS 3. Acquisition-related costs, other than those associated with the issue of debt or equity securities, are recognized as expenses as incurred. Where the initial accounting for a business combination is incomplete by the end of the reporting period in which the combination occurs, provisional amounts are reported for items for which accounting is incomplete and are adjusted during the measurement period as additional information about facts and circumstances existing at the acquisition date becomes available.

​

Gold and silver stream agreements

Gold and silver stream obligations are accounted for as financial liabilities at fair value through profit or loss in accordance with IFRS 9. The liabilities are initially recognized at fair value and subsequently remeasured at each reporting date, with changes in fair value recognized in profit or loss. The fair value measurement normally incorporates expected future metal deliveries, commodity prices, production profiles, contractual payment terms, timing of remaining deposits, discount rates and other relevant market participant assumptions. However, the Back Forty Project did not obtain all material permits by the August 31, 2026 milestone date under the gold stream agreement. The grace period runs to November 30, 2026, and if the milestone is not met or amended, the deposits plus accumulated interest could become repayable on demand. Because of this, fair value is measured by applying the contractual 12% interest to the deposits received.

​

Provisional pricing of concentrate sales

Under the terms of concentrate sales contracts with independent smelting companies, concentrate sales prices are provisionally set on a specified future date after shipment based upon market prices. The company records revenues under these contracts at the time of shipment, which is also when the risks and rewards of ownership pass to the smelting companies, using forward market metals prices on the expected date that final sales prices will be determined. Variations between the price recorded at the shipment date and the actual final price set under the smelting contracts are caused by changes in market metals prices, which result in an embedded derivative in accounts receivable. The receivable is recorded at fair value each period until final settlement occurs, with

changes in fair value classified as provisional price adjustments and included in revenue in the consolidated statement of income. The related receivables are subsequently measured at fair value through profit or loss, with changes in fair value resulting from movements in forward metal prices recognized in revenue.

​

Basis of consolidation – Gold Resource

The condensed interim consolidated financial statements include the accounts of Gold Resource and its subsidiaries from July 17, 2026, the date the Company obtained control. Gold Resource previously prepared its financial statements under US GAAP. Its assets and liabilities were measured at the acquisition date under IFRS 3 and the Company’s IFRS accounting policies. The principal differences from Gold Resource’s US GAAP policies are: the measurement of decommissioning obligations under IAS 37; capitalization of exploration and evaluation expenditures under IFRS 6; graded-vesting attribution of share-based payments under IFRS 2; and designation of the gold and silver stream liability at fair value through profit or loss under IFRS 9.

​

Mineral properties and mine development

Mineral property interests and mine development costs at producing mines are depleted on a unit-of-production basis over the proven and probable reserves, and a portion of measured and indicated resources where they are expected to be converted to reserves. Depletion of development projects, including the Back Forty Project, begins when the project reaches commercial production.

​

Contingent consideration assumed in a business combination

Contingent consideration assumed in a business combination that is an obligation of the acquiree is a financial liability measured at fair value through profit or loss. Changes in fair value are recognized in other income (expense).

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

​

Replacement share-based payment awards

When the Company replaces share-based payment awards held by employees of an acquiree, the market-based measure of the replacement awards attributable to pre-combination service forms part of the consideration transferred. The remainder is recognized as post-combination compensation expense. Equity-settled awards with graded vesting are expensed over the vesting period of each tranche. Awards that the Company may or must settle in cash are classified as liabilities and remeasured at fair value at each reporting date.

​

Employee benefits

The Company’s Mexican subsidiaries have statutory seniority premium and other termination benefit obligations. These are measured under IAS 19, Employee Benefits, using the projected unit credit method. Remeasurements are recognized in other comprehensive income, and service cost and net interest are recognized in profit or loss.

​

Income taxes and mining duties

Mexican mining duties calculated on a measure of taxable profit are accounted for as income taxes under IAS 12, Income Taxes (Note 21). Duties levied on gross revenue are presented in cost of sales.

​

3

Estimates, risks, and uncertainties

​

The preparation of financial statements in conformity with IFRS requires management to make estimates and assumptions that affect the amounts reported in the financial statements and accompanying notes. Actual results could differ from those estimates.

​

The Company’s management makes judgments in its process of applying the Company’s accounting policies in the preparation of its condensed interim consolidated financial statements. In addition, the preparation of the financial data requires that the Company’s management make assumptions and estimates of the effects of uncertain future events on the carrying amounts of the Company’s assets and liabilities at the end of the reporting period and the reported amounts of revenues and expenses during the reporting period. Actual results may differ from those estimates as the estimation process is inherently uncertain. Estimates are reviewed on an ongoing basis based on historical experience and other factors that are considered to be relevant under the circumstances.  Revisions to estimates and the resulting effects on the carrying amounts of the Company’s assets and liabilities are accounted for prospectively.

​

Significant judgments in applying accounting policies

The critical judgments that the Company’s management has made in the process of applying the Company’s accounting policies, apart from those involving estimations, that have the most significant effect on the amounts recognized in the Company’s condensed interim consolidated financial statements are as follows:

​

(i)

Impairment of assets

The carrying value of property, plant and equipment and the Company’s mineral property is reviewed each reporting period to determine whether there is any indication of impairment. If the carrying amount of an asset exceeds its recoverable amount, the asset is impaired and an impairment loss is recognized in profit or loss. The assessment of fair values, including those of the cash-generating units, require the use of estimates and assumptions for recoverable production, long-term commodity prices, discount rates, foreign exchange rates, future capital requirements and operating performance. Changes in any of the assumptions or estimates used in determining the fair value of assets could impact the impairment analysis.

​

(ii)

Impairment indicators for exploration and evaluation assets

Management applies judgment in assessing whether facts and circumstances indicate that the carrying amount of exploration and evaluation assets may exceed their recoverable amount. In making this assessment, management considers, among other matters, the period for which the entity has the right to explore in the specific area, plans for further exploration and evaluation, the results of exploration work to date, whether substantive expenditure on further exploration is budgeted or planned, and whether data exists that suggest the carrying amount is unlikely to be fully recovered from successful development or by sale. The use of judgment is particularly important in the early stages of a project where limited information may be available.

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

(iii)

Economic recoverability and probability of future economic benefits of exploration and development costs

Management has determined that exploratory drilling and evaluation costs incurred, which have been capitalized, are economically recoverable. Management uses several criteria in its assessments of economic recoverability and probability of future economic benefit including geologic and metallurgic information, history of conversion of mineral deposits to proven and probable reserves, scoping and feasibility studies, accessible facilities, existing permits and life-of-mine plans.

​

(iv)

Functional currency

The functional currency for each of the Company and its subsidiaries is the currency of the primary economic environment in which the entity operates. The Company has determined that the functional currency of each entity is the US dollar. Determination of functional currency may involve certain judgments to determine the primary economic environment and the Company reconsiders the functional currency of its entities if there is a change in events and conditions which determined the primary economic environment.

​

(v)

Identification of the accounting acquirer

Management applied judgment in concluding that the Company is the acquirer in the merger with Gold Resource. It considered the relative voting rights of each shareholder group in the combined entity, the composition of the board and senior management, the entity issuing the equity interests, and the relative size of each entity.

​

(vi)

Classification of the gold and silver stream liability

Management applied judgment in determining whether the Company has the right at the reporting date to defer settlement of the stream liability for at least twelve months. The judgment takes into account the Back Forty permitting milestone and the grace period under the gold stream agreement.

​

Key sources of estimation uncertainty

​

The areas which require management to make significant estimates and assumptions in determining carrying values include, but are not limited to:

​

(i)Mineral resource estimation

The carrying value and recoverability of mineral properties requires management to make certain estimates, judgments and assumptions about each project. Management considers the economics of the project, including the latest resources prices and the long-term forecasts, and the overall economic viability of the project. The determination of mineral resources also requires the use of estimates. The Company estimates its mineral resources based on information compiled by Qualified Persons as defined in accordance with National Instrument 43-101, Standards for Disclosure of Mineral Projects. There are numerous uncertainties inherent in estimating mineral resources and assumptions that are valid at the time of estimation which may change significantly when new information becomes available. Changes in the forecasted prices of commodities, exchange rates, production costs or recovery rates may change the economic status of resources and may result in changes to resource estimates.

​

(ii)Depreciation and depletion

Plant and other facilities used directly in mining activities are depreciated using the unit-of-production (“UOP”) method over a period not to exceed the estimated life of the ore body based on recoverable ounces to be mined from estimated resources. Mobile and other equipment are depreciated, net of residual value, on a straight-line basis, over the useful life of the equipment to the extent that the useful life does not exceed the related estimated life of the mine based on estimated recoverable resources.

​

The calculation of the UOP rate, and therefore the annual depreciation and depletion expense, could be materially affected by changes in the underlying estimates. Changes in estimates can be the result of actual future production differing from current forecasts of future production, expansion of mineral reserves through exploration activities, differences between estimated and actual costs of mining and differences in gold price used in the estimation of mineral reserves.

​

Significant judgment is involved in the determination of useful life and residual values for the computation of depreciation and depletion, and no assurance can be given that actual useful lives and residual values will not differ significantly from current assumptions.

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

(iii)Decommissioning and restoration provision

The Company assesses its provision for reclamation and remediation on an annual basis or when new material information becomes available. Mining and exploration activities are subject to various laws and regulations governing the protection of the environment. In general, these laws and regulations are continually changing and the Company has made, and intends to make in the future, expenditures to comply with such laws and regulations. Accounting for reclamation and remediation obligations requires management to make estimates of the future costs the Company will incur to complete the reclamation and remediation work required to comply with existing laws and regulations at each mining operation and exploration and development property. Actual costs incurred may differ from those amounts estimated. Also, future changes to environmental laws and regulations could increase the extent of reclamation and remediation work required to be performed by the Company. Increases in future costs could materially impact the amounts charged to operations for reclamation and remediation. The provision represents management’s best estimate of the present value of the future reclamation and remediation obligation. The actual future expenditures may differ from the amounts currently provided.

​

(iv)Contingencies

Due to the size, complexity and nature of the Company’s operations, various legal and tax matters are outstanding from time to time. In the event that management’s estimate of the future resolution of these matters changes, the Company will recognize the effects of the changes in its consolidated financial statements on the date such changes occur.

​

(v)Deferred taxes

In assessing the probability of realizing income tax assets recognized, management makes estimates related to expectations of future taxable income, expected timing of reversals of existing temporary differences and the likelihood that tax positions taken will be sustained upon examination by applicable tax authorities.  Estimates of future taxable income are based on forecasted cash flows from operations and the application of existing tax laws in each jurisdiction. Forecasted cash flows from operations are based on life-of-mine projections internally developed and reviewed by management.  The likelihood that tax positions taken will be sustained upon examination by applicable tax authorities is assessed based on individual facts and circumstances of the relevant tax position evaluated in light of all available evidence. Where applicable tax laws and regulations are either unclear or subject to ongoing varying interpretations, it is reasonably possible that changes in these estimates can occur that materially affect the amounts of income tax assets recognized. At the end of each reporting period, the Company reassesses unrecognized income tax assets.

​

(vi)Derivative valuation

The fair value of the warrant liabilities is determined using the Black-Scholes option pricing model, which requires the use of estimates and assumptions, including share price volatility, expected life, risk-free interest rate and expected dividends. Changes in any of the assumptions or estimates used in the valuation could impact the fair value of the derivative warrant liabilities and the amounts recognized in profit or loss.

​

(vii)Valuation of inventory

Expenditures incurred, and depreciation and depletion of assets used in mining and processing activities are deferred and accumulated as the cost of ore in stockpiles, ore on leach pads, in-process and finished metal inventories. These deferred amounts are carried at the lower of average cost or net realizable value (“NRV”). Write-downs of ore in stockpiles, ore on leach pads, in-process and finished metal inventories resulting from NRV impairments are reported as a component of current period costs. The primary factors that influence the need to record write-downs include prevailing and long-term metal prices and prevailing costs for production inputs such as labour, fuel and energy, materials and supplies, as well as realized ore grades and actual production levels.  

​

Costs are attributed to the leach pads based on current mining costs, including applicable depreciation and depletion relating to mining operations incurred up to the point of placing the ore on the pad. Costs are removed from the leach pad based on the average cost per recoverable ounce of gold on the leach pad as the gold is recovered. Estimates of recoverable gold on the leach pads are calculated from the quantities of ore placed on the pads, the grade of ore placed on the leach pads and an estimated percentage of recovery. Timing and ultimate recovery of gold contained on leach pads can vary significantly from the estimates. The quantities of recoverable gold placed on the leach pads are reconciled to the quantities of gold actually recovered (metallurgical balancing), by comparing the grades of ore placed on the leach pads to actual ounces recovered. The nature of the leaching process inherently limits the ability to precisely monitor inventory levels. As a result, the metallurgical balancing process is constantly monitored, and the engineering estimates are refined based on actual results over time. The ultimate recovery of gold from a pad will not be known until the leaching process is completed.

​

The allocation of costs to ore on leach pads and in-process inventories and the determination of NRV involve the use of estimates. There is a high degree of judgment in estimating future costs, future production levels, reserves estimates, gold and silver prices, and the ultimate estimated recovery for ore on leach pads. There can be no assurance that actual results will not differ significantly from estimates used in the determination of the carrying value of inventories.

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

(viii)Business combination and purchase price allocation

The acquisition of Gold Resource requires management to estimate the acquisition-date fair values of identifiable assets acquired and liabilities assumed, including mineral interests and mine development, land, buildings and site improvements, plant and equipment, inventories, reclamation and remediation obligations, the gold and silver stream liabilities, contingent consideration and related deferred tax balances. The purchase price allocation remains provisional at September 30, 2026 and may be adjusted during the measurement period as additional acquisition-date information becomes available.

​

(ix)Fair value of gold and silver stream liabilities

Normally, the stream liabilities are measured using valuation techniques that include significant unobservable inputs. Significant assumptions include forecast production and recoveries, timing of production and permitting, long-term gold and silver prices, contractual delivery percentages and ongoing payment terms, and discount rates. Changes in these assumptions may result in material changes in the fair value of the stream liabilities and amounts recognized in profit or loss. However, the Back Forty Project did not obtain all material permits by the August 31, 2026 milestone date under the gold stream agreement. The grace period runs to November 30, 2026, and if the permitting milestone is not met and the stream agreements are not amended, the deposits plus accumulated interest could become repayable on demand. Because of this, fair value is measured by applying the contractual 12% interest to the deposits received.

​

(x)Fair value of contingent consideration

The fair value of contingent consideration assumed in the acquisition is based on the expected timing and probability of contractual milestone payments and applicable discount rates. Changes in the timing or probability of achieving development and production milestones may result in changes in fair value recognized in profit or loss.

​

(xi)Uncertain tax positions

Gold Resource’s Mexican subsidiary is disputing an assessment issued by the Mexican tax authorities in respect of its 2015 tax year (Note 21). Management assesses whether it is probable that the taxation authority will accept the tax treatments taken in accordance with IFRIC 23, Uncertainty over Income Tax Treatments. A change in this assessment could have a material effect on the financial statements.

​

New accounting standards

​

IFRS 18, Presentation and Disclosure in Financial Statements

In April 2024, the IASB issued IFRS 18, Presentation and Disclosure in Financial Statements, which will replace IAS 1, Presentation of Financial Statements. IFRS 18 introduces new requirements for presentation within the statement of profit or loss, including defined categories and subtotals, and requires additional disclosure for certain management-defined performance measures. The standard also includes enhanced guidance on aggregation and disaggregation of information in the financial statements. IFRS 18 is effective for annual reporting periods beginning on or after January 1, 2027, with earlier application permitted. The Company is currently assessing the impact of IFRS 18 on its financial statements.

​

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

4

Financial instruments

​

Fair values of financial instruments

The accounting classification of each category of financial instruments, and the level within the fair value hierarchy in which they have been classified are set out below:

​

​

​

​

​

​

​

​

​

​

  ​ ​ ​

Fair Value 
Hierarchy Level

  ​ ​ ​

September 30, 
2026

  ​ ​ ​

December 31, 
2025

Financial assets

​

​

​

​

​

​

​

​

Amortized cost

​

​

​

​

​

​

​

​

Cash and cash equivalents (1)

​

N/A

​

$

168,388

​

$

9,611

Receivables (1)

​

N/A

​

​

85

​

​

451

Assets held for sale

​

N/A

​

​

-

​

​

35

Trade receivables – provisionally priced (FVTPL) (2)

​

Level 2

​

​

6,593

​

​

-

​

​

​

​

​

​

​

​

​

Financial liabilities

​

​

​

​

​

​

​

​

Other financial liabilities

​

​

​

​

​

​

​

​

Accounts payable & accrued liabilities (1)

​

N/A

​

​

52,358

​

​

25,212

Liabilities held for sale

​

N/A

​

​

-

​

​

422

Royalty payable

​

Level 3

​

​

5,557

​

​

4,284

Mining taxes payable

​

N/A

​

​

5,640

​

​

-

Gold and silver stream liability (3)

​

Level 2

​

​

108,900

​

​

-

Contingent consideration (4)

​

Level 3

​

​

2,597

​

​

-

Warrant liability (5)

​

Level 3

​

​

18,971

​

​

45,992

​

(1)

The carrying value of cash, receivables and accounts payable and accrued liabilities approximates fair value due to the short-term nature of these items.

(2)

As a result of the acquisition of Gold Resource, the Company’s financial instruments include provisionally priced trade receivables measured at fair value through profit or loss. Provisionally priced trade receivables are expected to be classified within Level 2.

(3)

As a result of the acquisition of Gold Resource, the Company’s financial instruments also include gold and silver stream liabilities measured at fair value through profit or loss. The Back Forty Project did not obtain all material permits by the August 31, 2026 milestone date under the gold stream agreement. The grace period runs to November 30, 2026, and if the permitting milestone is not met and the stream agreements are not amended, the deposits plus accumulated interest could become repayable on demand. Because of this, fair value is measured by applying the contractual 12% interest to the deposits received, thus expected to be classified within Level 2 of the fair value hierarchy.

(4)

As a result of the acquisition of Gold Resource, the Company’s financial instruments also include contingent consideration measured at fair value through profit or loss. The contingent consideration is expected to be classified within Level 3 of the fair value hierarchy.

(5)

The Company applies a standard Black-Scholes model to value the warrant liability as described in note 12.

​

5

Inventory

​

​

  ​ ​ ​

September 30, 
2026

  ​ ​ ​

December 31, 
2025

Materials and supplies

​

$

10,389

​

$

3,002

Work in progress

​

​

3,030

​

​

5,839

Finished goods

​

​

3,791

​

​

6,663

Stockpile

​

​

249

​

​

672

​

​

$

17,459

​

$

16,176

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

Cost of sales represents the amount of product inventory recognized as an expense. Inventories include materials and supplies, stockpiles and work in process, concentrates and finished goods, such as doré and concentrates at the Company’s mining operations in Mexico. Inventories acquired in the Gold Resource business combination were initially recognized at acquisition-date fair value. Finished goods were measured at estimated selling price less costs to complete and sell and a reasonable profit allowance, and materials and supplies at replacement cost.

​

6

Property, plant and equipment

​

​

  ​ ​ ​

Historic Costs at 
December 31, 2025

  ​ ​ ​

Acquired – Gold 
Resource (Note 19)

  ​ ​ ​

Additions

  ​ ​ ​

Disposals

  ​ ​ ​

September 30,2026

Plant and mining equipment

​

$

31,945

​

$

33,160

​

$

5,332

​

$

-

​

$

70,437

Machinery and equipment

​

​

3,561

​

​

44,398

​

​

967

​

​

-

​

​

48,926

Construction in Progress

​

​

-

​

​

5,056

​

​

924

​

​

-

​

​

5,980

Asset Retirement Cost

​

​

-

​

​

509

​

​

-

​

​

-

​

​

509

Office and furniture

​

​

199

​

​

751

​

​

81

​

​

-

​

​

1,031

Vehicles

​

​

1,056

​

​

1,182

​

​

488

​

​

(85)

​

​

2,641

Land

​

​

-

​

​

9,475

​

​

-

​

​

-

​

​

9,475

​

​

$

36,761

​

$

94,531

​

$

7,792

​

$

(85)

​

$

138,999

​

​

  ​ ​ ​

Accumulated 
Depreciation 
December 31, 2025

  ​ ​ ​

Depreciation

  ​ ​ ​

Disposals 
Disposals

  ​ ​ ​

September 30, 2026

Plant and mining equipment

​

$

12,320

​

$

2,047

​

$

-

​

$

14,367

Machinery and equipment

​

​

2,944

​

​

3,237

​

​

-

​

​

6,181

Asset Retirement Cost

​

​

-

​

​

509

​

​

-

​

​

509

Office and furniture

​

​

184

​

​

104

​

​

-

​

​

288

Vehicles

​

​

935

​

​

141

​

​

(85)

​

​

991

​

​

$

16,383

​

$

6,038

​

$

(85)

​

$

22,336

​

Property, plant and equipment acquired from Gold Resource is depreciated from July 17, 2026 on a straight-line or units of production basis over the remaining life of the assets, or on a unit-of-production basis over the remaining life of the Don David Gold Mine where that better reflects consumption. Land is not depreciated.

​

Carrying amount

  ​ ​ ​

September 30, 2026

  ​ ​ ​

December 31, 2025

Plant and mining equipment

​

$

56,070

​

$

19,625

Machinery and equipment

​

​

42,745

​

​

617

Construction in Progress

​

​

5,980

​

​

-

Asset Retirement Cost

​

​

-

​

​

-

Office and furniture

​

​

743

​

​

15

Vehicles

​

​

1,650

​

​

121

Land

​

​

9,475

​

​

-

​

​

$

116,663

​

$

20,378

​

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

7

NAFTA claim

​

On September 1, 2006, the Company entered into an Earn in/Option Agreement (“the Agreement”) with DynaResource de Mexico S.A. de C.V. (“DynaMexico”) and its parent company, DynaResource, Inc. (“DynaUSA”). Under the Agreement, the Company had the right to earn up to a 50% equity interest in DynaMexico by funding up to $18 million in exploration and development expenditures on the San Jose de Gracia property. On March 14, 2011, the Company completed its Earn in/Option Agreement with DynaMexico for its 50% equity interest by reaching the expenditure funding requirement of $18 million. Subsequent to this date there have been legal claims filed in Mexico and the United States which resulted in the foreclosure of the Company’s share ownership.

​

On October 13, 2015, the Company was made aware of a news release disseminated by DynaMexico which claimed DynaMexico was awarded a $48 million judgment against the Company’s subsidiary Goldgroup Resources Inc. The Company’s position in response to the $48 million claim is that the Company was never notified of the purported court case, and does not recognize any of the claims mentioned therein and is of the belief that such claims are entirely without merit. The Company pursued the case to the Mexican Supreme Court level to get the judgment overturned.

​

On December 6, 2019, the 11th Federal Circuit Collegiate Court in México denied Goldgroup’s amparo regarding the $48 million claim and on February 20, 2020 a Mexico City court issued a judgment in favour of DynaMexico.

​

On December 4, 2020, DynaMexico filed another claim seeking recognition of the judgment under the Texas Uniform Foreign-County Money Judgment Recognition Act. In response, the Company filed a Special Appearance, Motion to Dismiss for Improper Venue, and Motion for Non-Recognition. A hearing was held on the Special Appearance and Motion to Dismiss for Improper Venue on February 8, 2021 and on May 12, 2021, the 134th Judicial District Court, as a District Court of the State of Texas, ruled it is not required to recognize DynaMexico’s foreign judgment from the country of Mexico. DynaUSA has appealed this decision and the appeal has been fully briefed and oral arguments were held on April 20, 2022. On May 2, 2023, the court of appeals dismissed DynaUSA’s appeal.  

​

On March 6, 2023, the Company announced that its subsidiary, Goldgroup Resources, filed a Request for Arbitration on February 17, 2023 with the International Centre for Settlement of Investment Disputes (“ICSID”) against the United Mexican States. The treatment and inaction by the Mexican courts have resulted in a judicial expropriation of Goldgroup Resources’ investment in DynaMexico and a denial of justice in breach of Mexico’s obligations under the North American Free Trade Agreement (“NAFTA”). On February 7, 2024, Goldgroup Resources filed its Memorial on the Merits related to the NAFTA claim and received Mexico’s Counter Memorial on the Merits and Memorial on Jurisdiction on June 19, 2024. On December 12, 2024, Goldgroup Resources filed its Reply on the Merits and Counter Memorial on Jurisdiction and received Mexico’s Rejoinder on the Merits and Reply on Jurisdiction on April 28, 2025. On June 11, 2025, Goldgroup Resources filed its Rejoinder on Jurisdiction. On August 15, 2025, Goldgroup Resources and Mexico filed their respective Comments on the Non-Disputing Party Submissions filed by Canada and the United States of America pursuant to NAFTA Article 1128. On September 23, 2025, Goldgroup Resources’ damages experts filed a Supplemental Report on Quantum, and Goldgroup Resources received the Supplemental Report on Quantum of Mexico’s damages experts on November 18, 2025. Goldgroup Resources is seeking monetary damages as a result of Mexico’s breaches of NAFTA, as well as declarations from the arbitral tribunal to counter any potentially detrimental consequences stemming from the continued existence of the $48 million judgment issued by the Mexican courts in favour of DynaMexico. The NAFTA hearing concluded on June 3, 2026, and the Company is awaiting a ruling from the tribunal.

​

8

Mineral properties

​

Mineral property

  ​

  ​

Cerro Prieto

  ​

  ​

Esperanza 
Extension

  ​

  ​

San Francisco

  ​

  ​

Don David

  ​

  ​

Back Forty

  ​

  ​

Total

Balance, December 31, 2024

​

​

$

96

​

​

$

211

​

​

$

-

​

​

$

-

​

​

$

-

​

​

$

307

Acquired (Note 11)

​

​

​

-

​

​

​

-

​

​

​

13,766

​

​

​

-

​

​

​

-

​

​

​

13,766

Depletion

​

​

​

-

​

​

​

(127)

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

(127)

Balance, December 31, 2025

​

​

$

96

​

​

$

84

​

​

$

13,766

​

​

$

-

​

​

$

-

​

​

$

13,946

Acquired – Gold Resource (Note 19)

​

​

​

-

​

​

​

-

​

​

​

​

​

​

245,763

​

​

​

88,707

​

​

​

334,470

Additions

​

​

​

​

​

​

​

​

​

2,545

​

​

​

​

​

​

​

​

​

2,545

Depletion

​

​

​

-

​

​

​

(69)

​

​

​

-

​

​

​

(21,387)

​

​

​

-

​

​

​

(21,456)

Balance, September 30, 2026

​

​

$

96

​

​

$

15

​

​

$

16,311

​

​

$

224,376

​

​

$

88,707

​

​

$

329,505

​

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

On July 17, 2026, the Company acquired mineral interests associated with DDGM and the Back Forty Project as part of the Gold Resource business combination (Note 19). The acquisition-date values assigned to mineral interests and mine development are provisional.

​

Don David Gold Mine

The Don David Gold Mine (“DDGM”) is an underground gold-silver-base metal operation in Oaxaca, Mexico, that produces gold and silver concentrates containing copper, lead and zinc. DDGM is depleted on a unit-of-production basis from July 17, 2026, and depletion of $21,387 was recognized during the period. Sales from DDGM are subject to the Mexican mining duties described in Note 21.

​

Cerro Prieto Mine

The Company’s Cerro Prieto mining concessions have an existing 2% net smelter royalty (“NSR”).

​

San Francisco mine

During the year ended December 31, 2025, the Company acquired the San Francisco mine (Note 11). The San Francisco Mine is a large-scale, formerly producing open pit gold mine. The San Francisco Project encompasses concessions in the north central portion of the state of Sonora, Mexico, north of the state capital, Hermosillo.

​

The operation is comprised of two previously producing open pits (San Francisco and La Chicharra), together with heap leach processing facilities and associated infrastructure located close to the San Francisco pit.

​

The Company’s San Francisco mining Project has the following obligations owed to SA Targeted Investing Corp., a subsidiary of Royal Gold Inc. (“Royal Gold”):

​

(i)Gold Delivery: Commencing 5 (five) business days after restart of operations, and every month thereafter, deliver 75 gold ounces per month for 20 months to Royal Gold; (Note 11)
(ii)Net Smelter Royalty: the Company will pay to Royal Gold a 1% NSR on each of the following mining concessions: San Francisco, Patricia, Norma, La Pima, Dulce, and San Judas. The NSR will commence once the Gold Delivery obligation is complete.

​

Back Forty Project

The Back Forty Project is a zinc-gold-silver-copper development project in Menominee County, Michigan, held through Aquila Resources Inc. In order to move forward with the Back Forty Project, in April 2026, Gold Resource engaged an independent consultant to prepare a feasibility study to support permitting applications. The project is subject to the gold and silver stream agreements with OR Royalties Inc. (formerly Osisko Bermuda Limited) ("OR Royalties") and to contingent consideration payable to HudBay Minerals Inc. No depletion is recognized until commercial production.

​

9

Revenue

​

Following the acquisition of Gold Resource, the Company earns revenue from the sale of gold and silver doré from the Cerro Prieto mine, and from the sale of concentrates from the Don David Gold Mine containing gold, silver, copper, lead and zinc. Concentrate revenue is presented net of treatment and refining charges and credits. Revenue by product is as follows:

​

​

​

​

​

​

  ​ ​ ​

Three months ended 
September 30,

  ​ ​ ​

Nine months ended 
September 30,

​

​

2026

​

2025

​

2026

​

2025

Doré sales – gold

​

$

12,383

​

$

3,679

​

$

54,381

​

$

13,504

Doré sales – silver

​

​

286

​

​

28

​

​

589

​

​

147

Concentrate sales – gold

​

​

6,943

​

​

-

​

​

6,943

​

​

-

Concentrate sales – silver

​

​

27,222

​

​

-

​

​

27,222

​

​

-

Concentrate sales – copper

​

​

1,043

​

​

-

​

​

1,043

​

​

-

Concentrate sales – lead

​

​

969

​

​

-

​

​

969

​

​

-

Concentrate sales – zinc

​

​

6,948

​

​

-

​

​

6,948

​

​

-

Treatment and refining (charges) credits

​

​

598

​

​

-

​

​

598

​

​

-

Provisional pricing adjustments

​

​

668

​

​

-

​

​

668

​

​

-

Total revenue

​

$

57,060

​

$

3,707

​

$

99,361

​

$

13,651

​

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

Concentrate sales are provisionally priced, and final settlement is based on average market prices for a future period. Trade receivables from provisionally priced sales are measured at fair value through profit or loss (Level 2) using period-end forward metal prices. Changes in fair value are presented in revenue as provisional pricing adjustments. At September 30, 2026, provisionally priced receivables were $6,593, with final settlement expected within three months.

​

10

Assets and liabilities held for sale

​

On August 13, 2024, the Company entered into an agreement to acquire all of the interests owned by a group of creditors (the "Creditor Group") who own a loan facility pursuant to which various advances were made to Minera Apolo, S.A. de C.V. (“Apolo”) (the “Loan Facility”). The outstanding amount under the Loan Facility is currently approximately USD $2.7 million and the facility was secured against the assets and shares of Apolo located in San Luis Potosi, Mexico. In consideration for the acquisition of the Loan Facility from the Creditor Group, the Company agreed to issue 12.5 million common shares pro rata to the members of the Creditor Group, pay cash consideration of $0.5 million within 18 months of the closing date of the agreement, and pay $1.5 million in contingent consideration which is only due upon the completion of certain criteria, including a positive pre-feasibility study at the Pinos Project, the advancement of the project into commercial production, publishing an updated technical report with greater than 200,000 ounces of contained gold equivalent ounces for the Pinos Project, or the Company’s ownership interest in the Pinos Project falling to less than 51%.

​

On January 16, 2025, the Company obtained TSXV approval for the acquisition of the Loan Facility and began the process of enforcing its rights under its security provisions.

​

On March 7, 2025, the Company entered into an Agreement to Suspend Enforcement Proceedings (the "Non-Enforcement Agreement") dated March 6, 2025, with Candelaria Mining Corporation ("CMC"), who is the 100% owner of Apolo, with respect to the Loan Facility.

​

Pursuant to the terms of the Non-Enforcement Agreement, CMC will deliver all of the issued and outstanding shares of Apolo to the Company provided that certain conditions set out in the Non-Enforcement Agreement are satisfied, including receipt of all required approvals from the TSXV. As part of the agreement, the Company agreed to:

​

-Settle the approximately USD $2,703 owed on the Loan Facility;
-Make a cash payment of USD $89 within five (5) days of receipt of all necessary approvals from the TSXV required by the Company and CMC to complete the transactions;
-Make a cash payment of USD $89 on the later of (i) the delivery of the Apolo shares to the Company, or (ii) six months after receipt of the TSXV approvals, provided that the Apolo shares have been delivered to the Company by such date; and
-Issue 179,167 common shares of the Company.

​

On June 30, 2025, the Company obtained 100% ownership of the outstanding shares of Apolo.

​

Apolo is the 100% owner of the fully permitted gold project located east of the capital Zacatecas in the state of Zacatecas, Mexico (the “Pinos Project”).

​

Purchase Consideration

  ​ ​ ​

​

12,500,000 common shares issued for debt purchase (CAD $3.88)

​

$

35,454

179,167 common shares issued to Candelaria (CAD $3.88)

​

​

508

Cash to Candelaria

​

​

178

Acquisition payable

​

​

500

Acquisition costs

​

​

8

Total consideration

​

$

36,648

​

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

Purchase Price Allocation

  ​ ​ ​

​

Cash

​

$

24

IVA receivable

​

​

1,171

Prepaids

​

​

108

Pinos project

​

​

35,573

Accounts payable

​

​

(228)

Total consideration

​

$

36,648

​

On December 31, 2025, the Company entered into a Share Purchase Agreement where it has agreed to sell all the Apolo shares to a private arm’s length British Columbia company (the “Purchaser”) in consideration of the payment of $5,000 in stages, with $2,450 ($2,445 received as at December 31, 2025) deposit payable on signing which will be refunded if the transaction does not close by February 16, 2026, $550 to be paid on closing and $2,000 to be secured by a promissory note due on August 27, 2026. Although there was no formal modification of the agreement, the parties agreed that the deposit paid at signing should not be refunded on February 16, 2026 in anticipation of closing the sale on February 27. The Company completed the sale of the Pinos Project on February 27, 2026.

​

As the final payment is past due and has not been received, the Company has provided for the $2,000 on the statement of income and comprehensive income for the nine months ended September 30, 2026. Further, the Purchaser has agreed to assume any and all liabilities of the Company associated with the Apolo acquisition, including the assumption of $400 remaining payable on the original purchase agreement in addition to debt in the amount of $1,500 payable to the previous owners of Apolo that will be triggered by the sale of Apolo. The Company concluded that the sale meets the definition of an asset held for sale.

​

As at December 31, 2025, the impairment of the proposed sale is calculated as follows:

​

Impairment

  ​ ​ ​

December 31, 2025

Cash consideration

​

$

5,000

Assumption of payables

​

​

400

Assets of Pinos Project

​

​

(998)

Liabilities of Pinos Project

​

​

22

Carrying value of the Pinos Project

​

​

(35,573)

Impairment

​

$

31,149

​

As at December 31, 2025, assets held for sale included:

​

​

  ​ ​ ​

December 31, 2025

Cash

​

$

35

Receivables

​

​

842

Prepaids

​

​

122

Carrying value of the Pinos Project

​

​

4,424

​

​

$

5,423

​

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

As at December 31, 2025, liabilities held for sale included:

​

​

  ​ ​ ​

December 31, 2025

Accounts payable

​

$

422

​

​

$

422

​

11

Molimentales acquisition

​

On December 23, 2025, the Company acquired all of the issued and outstanding Series “A” shares in the fixed capital and all the issued and outstanding Series “B” shares in the variable capital (collectively the “Molimentales Shares”) of Molimentales del Noroeste, S.A. de C.V. (“Molimentales”) through a Concurso Mercantil process (restructuring proceeding equivalent to Chapter 11 in the United States). The Company has received approval from the Second District Court for Commercial Bankruptcy Matters (the “Mexican Court”) to the plan of arrangement (the “Plan of Arrangement”) the Company filed with the Mexican Court under the Concurso Mercantil process.

​

As part of the acquisition, the Company acquired 60.24% of the debts owed to certain major creditors as recognized by the Mexican Court for $8,971 of which $1,417 remains payable. Under the terms of the Plan of Arrangement, the Company has agreed to pay $2,566 in three equal installments in December 2026, 2027 and 2028 to the remaining creditors holding 39.76% of the recognized debt in addition to all outstanding mining concession fees (including penalties and interest), taxes, fees owed to the National Water Commission, supplier debts and certain expenses related to the Concurso proceedings currently estimated at approximately $8,026. Some of the payments described above are facilitated through the Company acquiring the Molimentales Shares by paying the owners of the Molimentales Shares MXN$100 and capitalizing Molimentales with MXN$99,900 for a total of MXN$100,000.  The Company determined that the acquisition met the definition of an asset acquisition.

​

Purchase Consideration

  ​ ​ ​

​

Debt purchased

​

$

8,971

Credit for debt owned by the Company

​

​

(3,274)

Molimentales Shares purchased

​

​

6

Transaction costs

​

​

1,750

Total consideration

​

$

7,453

​

​

​

​

Purchase Price Allocation

​

​

​

Cash

​

$

12

IVA receivable

​

​

489

Inventory

​

​

1,890

Plant and mining equipment

​

​

16,385

Mineral property

​

​

13,766

Accounts payable

​

​

(14,600)

Royalty payable*

​

​

(4,284)

Asset retirement obligation

​

​

(6,205)

Total consideration

​

$

7,453

​

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

*      The Royalty payable was estimated using a discounted cash flow method. Projected royalty receipts were calculated based on 75 ounces per month and forecast gold prices over the payment period, then discounted to December 23, 2025 at rates of 18.0% to 24.0% to reflect asset-specific risk. This produced a fair value range of $4,100 to $4,470, with a selected value of $4,284. During the nine months ended September 30, 2026, the Company recorded accretion of $717 on the Royalty payable and $556 related to a change in estimate as the restart of production is now estimated to be March 2027. As at September 30, 2026, the Royalty payable had a balance of $5,557 of which $2,180 is disclosed as current.

​

For the nine months ended September 30, 2026, the Company incurred $2,067 in expenses related to the San Francisco carrying costs. In the three months ended September 30, 2026, the Company capitalized some of the previously expensed costs, as these costs were incurred to refurbish some equipment needed to restart the mine.

​

12

Warrant liability

​

Investor warrants

  ​ ​ ​

Number 
of warrants

  ​ ​ ​

Weighted 
average exercise price 
(C$)

  ​ ​ ​

Warrant liability 
(US$)

Balance, December 31, 2024

​

5,106,535

​

$

0.52

​

$

1,446

Warrants granted

​

15,985,794

​

​

2.52

​

​

12,389

Warrants exercised

​

(6,481,253)

​

​

0.64

​

​

(4,903)

Change in fair value

​

-

​

​

-

​

​

37,060

Balance as of December 31, 2025

​

14,611,076

​

​

2.66

​

$

45,992

Warrants exercised

​

(2,194,822)

​

​

1.21

​

​

(8,041)

Change in fair value

​

-

​

​

-

​

​

(18,980)

Balance as of September 30, 2026

​

12,416,254

​

$

2.92

​

$

18,971

​

The following table discloses the details for investor warrants with exercise prices in CAD accounted for as a liability outstanding as at September 30, 2026:

​

Expiry date

  ​ ​ ​

Number 
of warrants

  ​ ​ ​

Exercise price (C$)

January 21, 2027

​

1,508,591

​

0.60

March 17, 2027

​

2,916,667

​

1.80

March 27, 2027

​

290,833

​

1.80

November 7, 2026

​

2,935,444

​

3.00

August 5, 2027

​

3,681,252

​

4.40

September 12, 2027

​

1,083,467

​

4.20

​

​

12,416,254

​

​

​

The following table discloses the details for investor warrants with exercise prices in USD accounted for through equity outstanding as at September 30, 2026:

​

Expiry date

  ​ ​ ​

Number 
of warrants

  ​ ​ ​

Exercise price (US$)

March 25, 2028

​

16,691,159

​

5.10

​

​

16,691,159

​

​

​

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

Finders warrants

  ​ ​ ​

Number 
of warrants

  ​ ​ ​

Weighted 
average exercise price (C$)

Opening balance, December 31, 2024

​

-

​

$

-

Warrants granted

​

1,039,357

​

​

2.16

Warrants exercised

​

(511,900)

​

​

0.64

Balance as of December 31, 2025

​

527,457

​

$

3.69

Warrants exercised

​

(27,288)

​

​

3.37

Balance as of September 30, 2026

​

500,169

​

$

3.64

​

The following table discloses the details for the finders warrants outstanding as at September 30, 2026:

​

Expiry date

  ​ ​ ​

Number 
of warrants

  ​ ​ ​

Exercise price (C$)

March 17, 2027

​

112,500

​

1.80

November 7, 2026

​

55,291

​

3.00

August 5, 2027

​

270,703

​

4.40

September 12, 2027

​

61,675

​

4.20

​

​

500,169

​

​

​

On January 21, 2025, the Company closed a private placement and issued 8,750,000 units at CAD $0.40 per unit for gross proceeds of $2,366 (CAD $3,500). Each unit consists of one common share and one-half common share purchase warrant, with each full warrant being exercisable to purchase one common share at a price of CAD $0.60 until January 21, 2027. The Company paid cash finder’s fees of $142 and issued 506,400 finder’s warrants to a finder in connection with the offering. The finder’s warrants have the same terms and conditions as the warrant. The fair value of the warrants per the private placement at the date of grant was estimated at $1,030, using the proportionate allocation method, and the fair value of the finders warrants was estimated at $208. These warrants were valued using the Black-Scholes option pricing model with the following weighted average assumptions: 2.92% risk free interest rate, expected life of 2 years, 127% annualized volatility and 0% dividend rate. The Company incurred $18 in transaction fees related to the private placement.

​

On March 17, 2025, the Company closed a private placement and issued 5,833,334 units at CAD $1.20 per unit for gross proceeds of approximately $4,893 (CAD $7,000). Each unit consists of one common share and one-half common share purchase warrant, with each full warrant being exercisable to purchase one common share at a price of CAD $1.80 until March 17, 2027. As part of the private placement, the Company issued 225,000 finder’s units allocated between the first and second tranches. Each finder’s unit consists of one common share and one-half common share purchase warrant, with each full warrant being exercisable to purchase one common share at a price of CAD $1.80 until March 17, 2027. The fair value of warrants per the private placement at the date of grant was estimated at $1,777 using the proportionate allocation method and the fair value of the finders warrants was estimated at $115. The warrants were valued using the Black-Scholes option pricing model with the following weighted average assumptions: 2.55% risk free interest rate, expected life of 2 years, 126% annualized volatility and 0% dividend rate.

​

On March 28, 2025, the Company closed a second tranche closing of its non-brokered private placement. For the second tranche, the Company issued an additional 645,833 units at CAD $1.20 per unit for gross proceeds of approximately $604 (CAD $775) Each unit consists of one common share and one-half common share purchase warrant, with each full warrant being exercisable to purchase one common share at a price of CAD $1.80 until March 27, 2027. The fair value of warrants per the private placement at the date of grant was estimated at $255 using the proportionate allocation method. The warrants were valued using the Black-Scholes option pricing model with the following weighted average assumptions: 2.55% risk free interest rate, expected life of 2 years, 127% annualized volatility and 0% dividend rate. The Company incurred $29 in transaction fees related to the private placement.

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

On May 7, 2025, the Company closed a private placement and issued a total of 6,818,182 units at CAD $2.20 per unit for gross proceeds of $10,866 (CAD $15,000). Each unit consists of one common share and one-half common share purchase warrant, with each full warrant being exercisable to purchase one common share at a price of CAD $3.00 until November 7, 2026. The Company paid cash finder’s fees of $4 and issued 157,949 finder’s units to a finder in connection with the offering. The finder’s units have the same terms and conditions as the warrants. The fair value of warrants per the private placement at the date of grant was estimated at $3,862 using the proportionate allocation method and the fair value of the finders warrants was estimated at $138. The warrants were valued using the Black-Scholes option pricing model with the following weighted average assumptions: 2.51% risk free interest rate, expected life of 1.5 years, 108% annualized volatility and 0% dividend rate. The Company incurred $55 in transaction fees related to the private placement.

​

On August 5, 2025, the Company closed a private placement financing and issued 3,750,000 units at a price of CAD $3.20 per unit for aggregate gross proceeds of $8,709 (CAD $12,000). Each unit comprises one common share and one common share purchase warrant. Each warrant is exercisable into one common share at a price of CAD $4.40 per share until August 5, 2027. The Company issued 271,547 finder's units to finders in connection with the private placement. Each finder's unit consists of one common share and one common share purchase warrant, with each warrant being exercisable to purchase one common share at a price of CAD $4.40 until August 5, 2027. The fair value of warrants per the private placement at the date of grant was estimated at $4,159 using the proportionate allocation method and the fair value of the finders warrants was estimated at $576. The warrants were valued using the Black-Scholes option pricing model with the following weighted average assumptions: 2.69% risk free interest rate, expected life of 2.0 years, 120% annualized volatility and 0% dividend rate. The Company incurred $47 in transaction fees related to the private placement.

​

On September 12, 2025, the Company closed a private placement financing and issued 1,212,121 units at a price of CAD $3.30 per unit for aggregate gross proceeds of $2,886 (CAD $4,000). Each unit comprises one common share and one common share purchase warrant. Each warrant is exercisable into one common share at a price of CAD $4.20 per share until September 12, 2027. The Company issued 19,503 finder's units and 50,430 finders warrants to finders in connection with the private placement. Each finder's unit consists of one common share and one common share purchase warrant, with each warrant being exercisable to purchase one common share at a price of CAD $4.20 until September 12, 2027. The fair value of warrants per the private placement at the date of grant was estimated at $1,306 using the proportionate allocation method and the fair value of the finders warrants was estimated at $138. The warrants were valued using the Black-Scholes option pricing model with the following weighted average assumptions: 2.50% risk free interest rate, expected life of 2.0 years, 115% annualized volatility and 0% dividend rate. The Company also paid cash finders fees of $139 and incurred $21 in transaction fees related to the private placement.

​

The fair value allocated to the investor warrants as at September 30, 2026, was $18,971 (December 31, 2025 - $45,992) and was recorded as a derivative financial liability as these warrants were exercisable in Canadian dollars, differing from the Company’s functional currency. The unrealized gain recognized in the statements of loss and comprehensive loss for the nine months ended September 30, 2026, was $18,980 (2025 – loss $16,156).

​

The fair value of the Company’s investor warrants was calculated using the Black-Scholes Option Pricing Model. Option pricing models require the input of highly speculative assumptions, including the expected future price volatility of the Company’s shares. Changes in these assumptions can materially affect the fair value estimate and, therefore, existing models do not necessarily provide a reliable single measure of the fair value of the Company’s warrants.

​

​

​

​

​

​

​

​

  ​ ​ ​

September 30,
2026

  ​ ​ ​

​

December 31, 
2025

 

Expected warrant life

​

​

0.51 years

​

​

​

1.24 years

​

Expected stock price volatility

​

​

90

%

​

​

95

%

Dividend payment during life of warrant

​

​

Nil

​

​

​

Nil

​

Expected forfeiture rate

​

​

Nil

​

​

​

Nil

​

Risk free interest rate

​

​

3.35

%

​

​

2.58

%

Weighted average strike price CAD

​

$

2.92

​

​

$

2.66

​

Weighted average fair value per warrant CAD

​

$

2.16

​

​

$

4.32

​

Weighted average share price CAD

​

$

4.52

​

​

$

6.24

​

​

On September 25, 2026, the Company closed a non-brokered private placement of 33,382,326 units at a price of US$3.65 per unit for gross proceeds of $121,845. Each unit consists of one common share and one-half of one common share purchase warrant. Each whole warrant entitles the holder to acquire one common share at an exercise price of $5.10 until March 25, 2028. In connection with the private placement, the Company incurred share issuance costs of $4,310, consisting of cash finder’s fees and legal costs.

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

The gross proceeds were allocated between common shares and warrants using the relative fair value method. The fair value of the common shares was determined by reference to the closing share price on the date of issuance, and the fair value of the 16,691,159 warrants was estimated using the Black-Scholes option pricing model, assuming a share price of $3.50, an exercise price of $5.10, an expected life of 1.5 years, expected volatility of 82%, a risk-free interest rate of 3.33% and an expected dividend yield of 0%.

​

As a result, $106,511 of the gross proceeds was allocated to share capital and $15,334 to warrants. Share issuance costs of $3,792 were charged to share capital and $518 to warrants, resulting in net amounts of $102,719 recorded in share capital and $14,816 recorded in the warrant reserve.

​

The warrants issued in connection with the September 25, 2026 private placement are exercisable at a fixed price of US$5.10 per share, which is denominated in the Company’s functional currency. As each warrant entitles the holder to acquire a fixed number of common shares for a fixed amount of cash, the warrants meet the definition of an equity instrument under IAS 32, Financial Instruments: Presentation, and are classified within equity in the warrant reserve. They are not remeasured subsequent to initial recognition. In contrast, the Company’s warrants with exercise prices denominated in Canadian dollars are classified as a derivative financial liability measured at fair value through profit or loss, as the amount of cash to be received on exercise is not fixed in the Company’s functional currency.

​

During the nine months ended September 30, 2026, the Company issued 2,222,110 common shares as a result of warrant exercises for gross

proceeds of approximately $1,968 (CAD $2,748).

​

13

Share-based compensation

​

The Company has adopted an equity award plan (the “Plan”) for which options, deferred share units (“DSUs”), and restricted share units (“RSUs”) may be granted to eligible optionees from time to time, to acquire up to 10% of the issued share capital, at the award date. Generally, share options granted have a maximum term of ten years, and a vesting period and exercise price determined by the board of directors. The exercise price of options granted under the Plan shall not be less than the Market Value of the Company's common shares at the date of grant, as defined under the Plan. DSUs are generally immediately vested at grant date and become non-forfeitable, with expected cash settlement at the termination of service or ten years from grant, whichever is sooner. RSUs are generally vested in three tranches, one, two, and three years of service after grant. As at September 30, 2026, the remaining equity award available for issue under the Plan were 14,292,675 (December 31, 2025 – 5,740,891).

​

Besides the assumption of share-based awards related to the Gold Resource acquisition as described below, the total share options granted during the nine months ended September 30, 2026 was 937,500 (2025 – nil). Total share-based compensation expense recognized for share-based awards during the nine months ended September 30, 2026 was $2,873 (2025 - $33).

​

The options granted in 2026 were granted to directors at an exercise price of C$6.20, vest immediately and expire one year from the date of grant. Their fair value of $1,691 was estimated using the Black-Scholes option pricing model with the following assumptions: risk-free rate 2.74%, expected life 1 year, volatility 70.83% and dividend yield nil.

​

The following tables disclose the number of options and vested options outstanding as at September 30, 2026:

​

​

​

​

​

​

  ​ ​ ​

September 30, 2026

  ​ ​ ​

December 31, 2025

​

​

Number of options

  ​ ​ ​

Weighted average 
exercise price (C$)

​

Number of options

  ​ ​ ​

Weighted average 
exercise price (C$)

Outstanding - beginning of period

​

1,571,875

​

$

0.20

​

1,987,500

​

$

0.19

Granted

​

937,500

​

​

6.20

​

-

​

​

-

Assumed at the acquisition of Gold Resource

​

275,191

​

​

11.97

​

-

​

​

-

Expired/forfeited

​

-

​

​

-

​

-

​

​

-

Exercised

​

(856,250)

​

​

0.24

​

(415,625)

​

​

0.16

Outstanding - end of period

​

1,928,316

​

$

4.78

​

1,571,875

​

$

0.20

​

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

Share-based awards assumed on the acquisition of Gold Resource

​

On completion of the Merger, the Company assumed Gold Resource’s outstanding stock options, deferred share units, restricted share units, and performance share units (“PSUs”), adjusted for the exchange ratio, on a post-consolidation basis. The total market-based fair value of the replacement awards is $6,335. The market-based measure of the replacement awards attributable to pre-combination service for equity-settled awards of $1,715 was included in the consideration paid (Note 19). The market-based measure of the replacement awards attributable to pre-combination service for cash-settled awards of $1,894 was included in the net assets transferred in the acquisition. For fully vested outstanding awards, $1,531 was recognized as compensation expense immediately after the acquisition. The remaining fair value of $1,195 is recognized as compensation expense over the remaining vesting periods. Awards that the Company intends to settle in cash are classified as liabilities, and presented within Other Non-Current Liability, with a carrying amount of $1,335 at September 30, 2026.

​

​

​

  ​ ​ ​

Stock options

  ​ ​ ​

DSUs

  ​ ​ ​

RSUs

  ​ ​ ​

PSUs

Assumed on acquisition of Gold Resource, July 17, 2026

​

275,191

​

458,861

​

685,961

​

172,584

PSUs converted to RSUs

​

-

​

-

​

172,584

​

(172,584)

Settled in common shares

​

-

​

-

​

(276,412)

​

-

Canceled for tax liability on net settlement

​

-

​

-

​

(317,128)

​

-

Settled in cash

​

-

​

(40,379)

​

-

​

-

Cancelled or forfeited

​

-

​

-

​

(4,766)

​

-

Outstanding, September 30, 2026

​

275,191

​

418,482

​

260,239

​

-

​

14

Related party transactions

​

The Company’s related parties include its subsidiaries, associates over which it exercises significant influence, and key management personnel. Key management personnel are those persons having the authority and responsibility for planning, directing and controlling the activities of the Company, directly or indirectly. Key management personnel include officers, directors or companies with common directors of the Company.  The remuneration of the Company’s directors and other key management personnel during the nine months ended September 30, 2026 and 2025, is as follows:

​

​

​

​

​

​

​

  ​

  ​

2026

  ​

  ​

2025

 

Short-term employee benefits included in salary and consulting

​

​

$

439

​

​

$

180

​

Director’s fees included in professional fees

​

​

​

774

​

​

​

79

​

Share-based compensation

​

​

​

4,164

​

​

​

6

​

Severance payments

​

​

​

2,558

​

​

​

-

​

Consulting fees included in salary and consulting

​

​

​

72

​

​

​

-

​

​

​

​

$

8,007

​

​

$

265

​

​

Short-term employee benefits include salaries incurred within the last three months of the statement of financial position date and other annual employee benefits.

​

At September 30, 2026, accounts payable and accrued liabilities include $126 (December 31, 2025 - $76) owing to a director and/or officer and/or companies controlled by the directors.

​

15

Segmented disclosure

​

The Company's operating segments are based on the reports reviewed by its chief operating decision maker ("CODM"), the Chief Executive Officer, to allocate resources and assess performance. The CODM reviews each mining operation separately.

​

At the end of last fiscal year, the Company had two operating segments: Cerro Prieto and San Francisco. The Company’s business activities that are not considered distinct segments are included in the reconciliation under the title Corporate and Other.  Following the merger with Gold Resource Corporation on July 17, 2026 (Note 19), the Company has four operating segments, each of which is a reportable segment:

​

●Cerro Prieto: the producing open-pit, heap-leach gold mine in Sonora, Mexico.

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

●San Francisco: the formerly producing gold mine in Sonora, Mexico, currently on care and maintenance; refurbishment, infill drilling, and resources update required for decision on restart.
●Don David: the producing underground gold and silver mine in Oaxaca, Mexico.
●Back Forty: the gold and base metals project in Michigan, United States, which is not yet in production.

​

Corporate and Other comprises of head office activities and oversees plans and activities of early-stage exploration projects.

​

The measure of segment profit or loss is income (loss) before income taxes. All revenue is from external customers; there are no inter-segment revenues. Don David and Back Forty are included from July 17, 2026 and show nil amounts for comparative periods.

​

The basis of segmentation differs from that in the annual consolidated financial statements for the year ended December 31, 2025, which presented two operating segments, Mining and Exploration and Corporate. Following the merger with Gold Resource, Mining and Exploration has been replaced by the four operating segments above, and Corporate is presented as a non-operating segment. Comparative information has been re-presented on the current basis.

​

Income (loss) for the period by segment

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Nine months ended
September 30, 2026

  ​

  ​

Cerro
Prieto

  ​

  ​

San
Francisco

  ​

  ​

Back
Forty

  ​

  ​

Don
David

  ​

  ​

Corporate
and
Other

  ​

  ​

Total

 

Sales

​

​

$

54,970

​

​

$

-

​

​

​

-

​

​

$

44,391

​

​

​

-

​

​

$

99,361

​

Cost of Sales

​

​

​

(47,911)

​

​

​

-

​

​

​

(18)

​

​

​

(58,029)

​

​

​

-

​

​

​

(105,958)

​

Mining Gross Profit

​

​

​

7,059

​

​

​

-

​

​

​

(18)

​

​

​

(13,638)

​

​

​

-

​

​

​

(6,597)

​

General and Administrative costs

​

​

​

(1,117)

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

(8,995)

​

​

​

(10,112)

​

Profit/(loss) before income taxes

​

​

​

2,604

​

​

​

(3,561)

​

​

​

(2,449)

​

​

​

(13,846)

​

​

​

5,501

​

​

​

(11,751)

​

Income Tax (Expense) Benefit

​

​

​

(1,374)

​

​

​

-

​

​

​

8

​

​

​

(5,367)

​

​

​

8,519

​

​

​

1,786

​

Net Profit (Loss)

​

​

$

1,230

​

​

$

(3,561)

​

​

$

(2,441)

​

​

$

(19,213)

​

​

$

14,020

​

​

​

(9,965)

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Nine months ended
September 30, 2025

  ​

  ​

Cerro
Prieto

  ​

  ​

San
Francisco

  ​

  ​

Back
Forty

  ​

  ​

Don
David

  ​

  ​

Corporate
and
Other

  ​

  ​

Total

 

Sales

​

​

$

13,651

​

​

$

-

​

​

$

-

​

​

$

-

​

​

$

-

​

​

$

13,651

​

Cost of Sales

​

​

​

(12,829)

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

(12,829)

​

Mining Gross Profit

​

​

​

822

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

822

​

General and Administrative costs

​

​

​

(1,723)

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

(2,578)

​

​

​

(4,301)

​

Profit/(loss) before income taxes

​

​

​

(1,280)

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

(45,836)

​

​

​

(47,116)

​

Income Tax (Expense) Benefit

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

-

​

​

​

-

​

Net Profit (Loss)

​

​

$

(1,280)

​

​

$

-

​

​

$

-

​

​

$

-

​

​

$

(45,836)

​

​

$

(47,116)

​

​

The Company had not yet acquired Gold Resource Corporation as of the end of the prior year comparative nine months ended September 30, 2025. Consequently, nil amounts are presented for the mines of Gold Resource Corporation in the above table.

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

Assets by geographic segment

​

​

​

​

​

​

​

​

​

​

As at September 30, 2026

  ​

  ​

USA

  ​

  ​

Mexico

  ​

  ​

Corporate
and
Other

  ​

  ​

Total

 

Current assets

​

​

$

122

​

​

$

74,165

​

​

$

128,641

​

​

$

202,928

​

Mineral interest, Property, Plant, and Equipment

​

​

​

100,046

​

​

​

346,068

​

​

​

54

​

​

​

446,168

​

Exploration and evaluation assets

​

​

​

-

​

​

​

2,588

​

​

​

-

​

​

​

2,588

​

Other non-current assets

​

​

​

-

​

​

​

1,538

​

​

​

238

​

​

​

1,776

​

Total non-current assets

​

​

​

100,046

​

​

​

350,194

​

​

​

292

​

​

​

450,532

​

Total assets

​

​

$

100,168

​

​

$

424,359

​

​

$

128,933

​

​

$

653,460

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

As at December 31, 2025

​

​

USA

​

​

Mexico

​

​

Corporate
and
Other

​

​

Total

​

Current assets

​

​

​

-

​

​

$

27,278

​

​

$

6,730

​

​

$

34,008

​

Mineral interest, Property, Plant, and Equipment

​

​

​

-

​

​

​

34,324

​

​

​

-

​

​

​

34,324

​

Exploration and evaluation assets

​

​

​

-

​

​

​

1,489

​

​

​

-

​

​

​

1,489

​

Other non-current assets

​

​

​

-

​

​

​

1,807

​

​

​

36

​

​

​

1,843

​

Total non-current assets

​

​

​

-

​

​

​

37,620

​

​

​

36

​

​

​

37,656

​

Total assets

​

​

​

-

​

​

$

64,898

​

​

$

6,766

​

​

$

71,664

​

​

16

Commitments and contingencies

​

a.

In 2011, the Company acquired the Caballo Blanco project held previously by Almaden Minerals Ltd. (“Almaden”). As part of the consideration, the Company may have to issue up to an additional 175,000 common shares of the Company upon achievement of certain project milestones. As a result, as at September 30, 2026, the Company has recorded a contingent share consideration of $3,305 (December 31, 2025 - $3,305). Subsequent to the sale of Caballo Blanco to Timmins Gold in fiscal 2014 and further sale from Timmins Gold to Candelaria Mining Corp. in 2016, the terms of these contingent shares remained unchanged. Pursuant to a plan of arrangement the right to receive shares has been transferred to Almadex Minerals Limited.

​

b.

During the year ended December 31, 2025, the Company acquired the Pinos project and agreed to pay $1.5 million in contingent consideration which is only due upon the completion of certain criteria, including a positive pre-feasibility study at the Pinos Project, the advancement of the project into commercial production, publishing an updated 43-101 with greater than 200,000 ounces of contained gold equivalent ounces for the Pinos Project, or the Company’s owned interest in the Pinos Project falling to less than 51%. On December 31, 2025, the Company entered into a Share Purchase Agreement where it has agreed to sell all the Apolo shares to a private arm’s length British Columbia company who has agreed to assume the contingent consideration (Note 10).

​

c.

The Company was entitled to receive an additional contingent consideration from the 2014 Caballo Blanco sale of $5.0 million that would become payable in cash, Timmins Gold shares, or a combination thereof (at the option of Timmins Gold, provided that the Company’s ownership in Timmins Gold will not exceed 9.9% at any time) should any of the following events occur prior to October 31, 2019:

​

●The approval of the Project's Environmental Impact Statement from SEMARNAT (“Environmental Permit”); or
●A change in beneficial ownership of Timmins Gold of greater than 50%; or
●The removal or change, at one time, of a majority of the current members of the Timmins Gold Board of Directors

​

d.

During the year ended December 31, 2016, the Company sold the contingent receivable to Credipresto for cash consideration of $1,900, which was paid upon execution and the proceeds were used to pay back the principal of the Facility and the Company recognized a gain on sale of $1,900. An additional $600 will be contingently payable to the Company by Credipresto when the owner of Caballo Blanco receives the Environmental Permit. Although the Company may become entitled to the contingent payments, the value of these payments has not been recognized in the statement of financial position as at September 30, 2026 due to the level of uncertainty surrounding the conditions required for the payments.

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

Gold Resource

​

As at September 30, 2026, the Company’s Mexican subsidiary acquired with Gold Resource had equipment purchase commitments of $3,935. The Company also assumed contingent consideration payable to HudBay Minerals Inc. on the development of the Back Forty Project. It is also disputing a tax assessment issued by the Mexican tax authorities in respect of the 2015 tax year.

​

The gold and silver stream agreements contain customary default provisions. If the Company’s subsidiary, Aquila Resources Inc., fails to obtain the required permits or achieve commercial production by the agreed dates, it may be required to repay the deposits received of $37.2 million plus accumulated interest at the rate agreed with OR Royalties. If it does not repay, OR Royalties may enforce its security over the Back Forty Project assets (Note 20).

​

The Company is subject to other claims, legal proceedings and environmental and safety regulation incidental to its operations. Management does not expect these matters to have a material adverse effect on the Company’s financial position.

​

17

Capital management

​

The capital of the Company consists of items included in shareholders’ equity (deficiency). The Company’s objectives for capital management are to safeguard its ability to support the Company’s normal operating requirement on an ongoing basis, continue the operations, development and exploration of its mineral properties and support any expansionary plans.

​

The Company manages its capital structure and makes adjustments in light of changes in its economic environment and the risk characteristics of the Company’s assets. To effectively manage the entity’s capital requirements, the Company has in place a planning, budgeting and forecasting process to help determine the funds required to ensure the Company has the appropriate liquidity to meet its operating and growth objectives. There are no externally imposed capital requirements with which the Company has failed to comply. There has been no change to the capital management of the Company during the nine months ended September 30, 2026.

​

18

Supplemental cash flow information

​

The table below shows the non-cash investing activities due to the GRC acquisition:

​

​

​

​

​

​

​

​

Nine months ended Sept. 30,

​

​

  ​

  ​

Note

  ​

  ​

2026

  ​

  ​

2025

 

Non-Cash Increase in Mineral Interest due to GRC acquisition

​

​

19

​

​

334,470

​

​

-

 

Non-Cash Increase in PP&E due to GRC acquisition

​

​

19

​

​

94,531

​

​

-

​

Value of Shares Issued for non-cash consideration

​

​

19

​

​

251,070

​

​

-

​

Assumed Equity Awards for non-cash consideration

​

​

19

​

​

1,715

​

​

-

​

​

19

Business combination - Gold Resource Corporation

​

On July 17, 2026, the Company and GRC closed the merger (the “Merger”) pursuant to the Arrangement Agreement and Plan of Merger (the “Arrangement Agreement”), dated January 25, 2026 and amended on May 15, 2026, by and among GRC, the Company, and Goldgroup Merger Sub Inc., a wholly owned subsidiary of the Company. As a result of the Merger, GRC shareholders received 0.3619 (the “Exchange Ratio”) post-consolidation common shares of Goldgroup for each share of GRC’s common stock held.

​

As a result of the Merger, GRC was delisted from the NYSE American LLC (the “NYSE American”). Concurrently, the Company commenced trading on the NYSE American under the ticker symbol “GORO” and changed its ticker symbol on the TSX Venture Exchange (“TSXV”) from “GGA” to “GORO.” The Company’s common shares were no longer quoted on the OTC Markets upon commencement of trading on the NYSE American. In accordance with the terms of the Arrangement Agreement, the Company and GRC jointly determined the ratio of the share consolidation to be one (1) post-consolidation share for every four (4) pre-consolidation shares. In connection with the completion of the Merger, the Company issued 59,132,077 common shares and assumed 275,191 stock

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

options, 458,861 deferred share units, 685,961 restricted share units and 172,584 performance share units, in each case on a post-consolidation basis and reflecting the Exchange Ratio. Upon assumption, performance share units were converted to restricted share units.

​

​

​

Purchase Consideration

  ​

  ​

​

​

 

GRC common shares outstanding at closing

​

​

​

163,392,909

​

Exchange ratio (post-consolidation)

​

​

​

0.3619

​

Resulting common shares issued

​

​

​

59,132,077

​

Closing share price in USD, July 17, 2026

​

​

$

4.2459

​

Fair value of common shares issued

​

​

$

251,070

​

Fair value of replacement share-based awards – pre-combination service (Note 13)

​

​

​

1,715

​

Total consideration

​

​

$

252,785

​

​

​

​

Purchase Price Allocation

  ​

  ​

​

​

 

Cash and cash equivalents

​

​

$

42,617

​

Accounts receivable

​

​

​

2,501

​

Inventories

​

​

​

15,660

​

Prepaid expenses and other current assets

​

​

​

5,089

​

Land

​

​

​

9,475

​

Plant and equipment

​

​

​

85,056

​

Mineral interest – Don David Gold Mine

​

​

​

245,763

​

Mineral interest – Back Forty Project

​

​

​

88,707

​

Other non-current assets

​

​

​

130

​

Total identifiable assets

​

​

​

494,998

​

Accounts payable and accrued liabilities

​

​

​

(27,414)

​

Mining royalty and income taxes payable

​

​

​

(4,059)

​

Gold and silver stream liability

​

​

​

(106,400)

​

Decommissioning and restoration provisions

​

​

​

(8,307)

​

Contingent consideration

​

​

​

(3,472)

​

Other non-current liabilities

​

​

​

(2,632)

​

Deferred income tax liabilities, net

​

​

​

(89,929)

​

Total liabilities assumed

​

​

​

(242,213)

​

Net identifiable assets acquired

​

​

​

252,785

​

Total consideration

​

​

$

252,785

​

​

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

​

Valuation methods and significant assumptions

​

The Company engaged an independent valuation firm to assist in estimating fair values. The significant assets and liabilities were measured as follows:

​

Mineral properties were valued using a discounted cash flow method under the income approach. Don David cash flows cover the period to 2029 and were discounted at 20.5%. Back Forty cash flows reflect a four-year deferral of first production to 2031, run through 2043, and were discounted at 45.0% given its development stage. Key assumptions include production volumes from the life-of-mine plans and reserve reports, consensus commodity prices (long-term gold $4,495/oz and silver $68.63/oz from 2028), operating and capital costs, and the discount rates. These are Level 3 inputs under IFRS 13, Fair Value Measurement.

​

Land and plant and equipment were valued using both the cost approach (depreciated replacement cost) and market approach, with most weight being put on the cost approach.

​

Gold and silver stream liabilities were recognized at fair value, consistent with its designation as a financial liability at fair value through profit or loss (Note 20). The Back Forty Project did not obtain all material permits by the August 31, 2026 milestone date under the gold stream agreement. The grace period runs to November 30, 2026, and if the permitting milestone is not met and the stream agreements are not amended, the deposits plus accumulated interest could become repayable on demand. Because of this, fair value is measured by applying the contractual 12% interest to the deposits received and reported in current liabilities.

​

Decommissioning and restoration provisions were measured at the present value of estimated closure and reclamation costs, discounted at 8.8% reflecting market participant assumptions.

​

Trade receivables, prepaid expenses, and accounts payable and accrued liabilities were recognized at their carrying amounts, which approximate fair value given their short-term nature. Inventories were measured at fair value as described in Note 5.

​

Deferred income taxes were recognized and measured in accordance with IAS 12, Income Taxes, rather than at fair value, as required by the exception in IFRS 3, Business Combinations. Deferred income tax liabilities of $89,929 were recognized on the difference between the acquisition-date fair values of the assets acquired and liabilities assumed and their tax bases, at the enacted rates in Mexico (30% income tax and 8.5% special mining duty) and the United States.

​

Contingent consideration payable to HudBay Minerals Inc. was measured at fair value using the probability and expected timing of the Back Forty development milestones, discounted at 8%.

​

The right-of-use assets and related lease liabilities acquired through the merger were immaterial and were measured at the present value of the remaining lease payments as if the acquired leases were new leases at the acquisition date.

​

The replacement share-based awards were measured using the market-based measure under IFRS 2 at the acquisition date. The portion attributable to pre-combination service of $1,715 is included in consideration (Note 13).

​

The Company assessed contingent liabilities of Gold Resource, including the assessment issued by the Mexican tax authorities in respect of the 2015 tax year (Note 21). Uncertain income tax positions are measured under IAS 12 and IFRIC 23 rather than at fair value.

​

The allocation above is preliminary. The Company has not finalized the valuation of mineral properties, plant and equipment, the stream liability, decommissioning and restoration provisions, inventories, contingent consideration, replacement share-based awards, leases and deferred income taxes. Amounts may change during the measurement period, which will not exceed one year from the acquisition date. Adjustments will be recognized retrospectively, with comparative information revised as if the accounting had been completed at the acquisition date.

​

Acquisition-related costs

Through September 30, 2026, the Company incurred acquisition-related costs of $2,914, of which $2,483 was expensed in the nine months ended September 30, 2026 (2025 – $431) and is included in general and administrative expenses in the statement of income (loss). Costs directly attributable to issuing the common shares were immaterial and were not deducted from share capital.

​

Acquired receivables

The fair value of acquired trade receivables was $2,501, all of which is expected to be collected.

​

Contribution of Gold Resource and pro forma results

From July 17, 2026 to September 30, 2026, Gold Resource contributed revenue of $44,391 and net loss of $24,984. Had the acquisition occurred on January 1, 2026, management estimates that consolidated revenue would have been $176,654 and

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

consolidated net loss would have been $67,122 for the nine months ended September 30, 2026. In determining these amounts, management assumed that the fair value adjustments at the acquisition date would have been the same had the acquisition occurred on January 1, 2026.

​

20

Gold and silver stream agreements

​

As part of the acquisition of Gold Resource Corporation on July 17, 2026, the Company assumed gold and silver stream obligations relating to the Back Forty Project with OR Royalties. The agreements have an initial 40-year term and are automatically renewable for successive ten-year periods, subject to their contractual terms.

​

Gold stream agreement

Under the gold stream agreement, OR Royalties has committed deposits to the Back Forty Project. OR Royalties has deposited $20.0 million of its total commitment of $50.0 million. The remaining deposits of $5.0 million on receipt of the permits required to develop and operate the Back Forty Project, and $25.0 million on the first drawdown of a project debt finance facility, depend on these milestones and other conditions and are not recognized. Once production commences, OR Royalties is entitled to purchase 18.5% of refined gold until 105,000 ounces have been delivered, after which the percentage is reduced to 9.25%. The ongoing cash payment is equal to 30% of the spot price of gold on the delivery date, subject to a maximum of $600 per ounce.

​

Silver stream agreement

Under the silver stream agreement, OR Royalties is entitled to purchase 85% of silver produced from the Back Forty Project at $4.00 per ounce. A total of $17.2 million has been advanced under the silver stream agreement, and there are no further deposits receivable.

​

The stream agreements contain customary operating, financial, security and default provisions. The Back Forty Project assets secure certain obligations under the agreements. Under the amended gold stream agreement, the Company’s subsidiary, Aquila Resources Inc., was required to obtain all material permits necessary to construct and operate the Back Forty Project by August 31, 2026, with a grace period to November 30, 2026. If the permits are not obtained and the agreements are not further amended, the subsidiary may be in default. The deposits received of $37.2 million plus accumulated interest at the agreed rate could then become repayable immediately, and OR Royalties may enforce its security over the Back Forty Project assets. Because the Company does not have the right at September 30, 2026 to defer settlement for at least twelve months after the reporting date, the stream liability is classified as current.

​

In accordance with IFRS 9, the gold and silver stream obligations are measured at fair value through profit or loss. The liabilities were initially recognized at acquisition-date fair value as part of the purchase price allocation and are remeasured at fair value at September 30, 2026. Changes in fair value are recognized in profit or loss, except changes attributable to the Company’s own credit risk, which are recognized in other comprehensive income in accordance with IFRS 9.

​

​

Stream liability reconciliation

  ​ ​ ​

$000s

Acquisition-date fair value - July 17, 2026

​

$

106,400

Change in fair value recognized in profit or loss

​

​

2,500

Foreign exchange and other

​

​

-

Balance - September 30, 2026

​

$

108,900

Current portion

​

$

108,900

​

The Back Forty Project did not obtain all material permits by the August 31, 2026 milestone date under the gold stream agreement. The grace period runs to November 30, 2026, and if the permitting milestone is not met and the stream agreements are not amended, the deposits plus accumulated interest could become repayable on demand. Because of this, fair value is measured by applying the contractual 12% interest to the deposits received and is categorized within Level 2 of the fair value hierarchy.

​

21

Income taxes

​

Following the acquisition of Gold Resource, the Company is subject to income taxes in Canada, Mexico and the United States. Its Mexican operations are subject to the 30% Mexican corporate income tax and to two mining duties effective January 1, 2025. The first is a special mining duty of 8.5% of taxable income as defined under Mexican tax law, calculated generally on earnings before income tax, depreciation, depletion, amortization and interest. The second is an extraordinary mining duty of 1.0% of gross revenue from the sale of gold, silver and platinum. Both duties are deductible for Mexican income tax purposes. The special mining duty is accounted for as an income tax under IAS 12. The extraordinary mining duty, which is levied on revenue, is presented in cost of

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

sales. Income tax expense for interim periods is based on management’s estimate of the weighted average annual income tax rate expected for the full financial year in each jurisdiction.

​

​

​

Three months ended 
September 30,

​

Nine months ended
September 30,

​

​

2026

​

2025

​

2026

​

2025

Current income tax

  ​ ​ ​

$

(5,162)

  ​ ​ ​

$

-

  ​ ​ ​

$

(5,602)

  ​ ​ ​

$

-

Current special mining duty

​

​

(1,758)

​

​

(4)

​

​

(2,634)

​

​

-

Deferred income tax & special mining duty

​

​

10,022

​

​

-

​

​

10,022

​

​

-

Income tax (expense) benefit

​

$

3,102

​

$

(4)

​

$

1,786

​

$

-

​

​

Deferred income tax liabilities

  ​ ​ ​

​

Balance, December 31, 2025

​

$

-

Acquired on acquisition of Gold Resource (Note 19)

​

​

89,929

Recognized in profit or loss

​

​

(8,275)

Balance, September 30, 2026

​

$

81,654

​

Mexican tax assessment

In October 2023, Gold Resource’s Mexican subsidiary received a notification from the Mexican Tax Administration Service (“SAT”) of a sanction of MXN 331 million (approximately $18.6 million at September 30, 2026). The sanction resulted from an audit of the 2015 tax year covering intercompany transactions, the special mining duty and the extraordinary mining duty. The subsidiary is disputing the assessment. Management considers it probable that the tax authorities will accept the tax treatments taken, and no provision has been recognized.

​

22

Earnings per share

​

The table below shows the calculation of basic and diluted weighted average share and basic and diluted earnings per share calculation:

​

​

​

​

​

​

​

Three months ended Sept. 30,

​

​

Nine months ended Sept. 30,

​

​

​

Note

​

2026

​

2025

​

2026

​

2025

Net Loss (Basic Numerator)

​

​

​

​

​

$

(10,237)

​

​

$

(4,773)

​

​

$

(9,965)

​

​

$

(47,116)

Adjustments to net loss:

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

DSU mark-to-market gain

​

​

​

​

​

​

(527)

​

​

​

-

​

​

​

(527)

​

​

​

-

Warrants mark-to-market gain

​

​

​

​

​

​

(16,153)

​

​

​

-

​

​

​

(18,980)

​

​

​

-

Adjusted Net Loss (Dilutive Numerator)

​

​

​

​

​

$

(26,917)

​

​

$

(4,773)

​

​

$

(29,472)

​

​

$

(47,116)

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Weighted average shares outstanding (000’s)

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Basic (Basic Denominator)

​

​

​

​

​

​

127,150

​

​

​

70,018

​

​

​

92,048

​

​

​

52,536

Adjustments weighted average shares outstanding:

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Dilutive warrants

​

​

​

​

​

​

4,679

​

​

​

-

​

​

​

6,775

​

​

​

-

Dilutive DSUs

​

​

​

​

​

​

346

​

​

​

-

​

​

​

117

​

​

​

-

Diluted (Dilutive Denominator)

​

​

​

​

​

​

132,175

​

​

​

70,018

​

​

​

98,940

​

​

​

52,536

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Loss per share – Basic

​

​

​

​

​

$

(0.08)

​

​

$

(0.07)

​

​

$

(0.11)

​

​

$

(0.90)

Loss per share – Diluted

​

​

​

​

​

$

(0.20)

​

​

$

(0.07)

​

​

$

(0.30)

​

​

$

(0.90)

​

​

​


Goldgroup Mining Inc.

Notes to Condensed Interim Consolidated Financial Statements

For the three and nine months ended September 30, 2026 and 2025

(amounts expressed in thousands of US dollars, except where indicated - Unaudited)

​

23

Subsequent events

​

Subsequent to the three and nine months ended September 30, 2026, on October 14, 2026, the Company completed its strategic investment in Luca Mining Corp. ("Luca") through a bought deal private placement offering of subscription receipts ("Subscription Receipts") of Luca in connection with Luca's proposed acquisition of the Cozamin Mine. On October 14, 2026, the Company acquired 101,123,662 Subscription Receipts of Luca at a price of C$1.00 per Subscription Receipt, for an aggregate investment amount of C$101,124. Upon completion of the acquisition and conversion of all receipts, the Company would hold approximately 19.9% of Luca’s outstanding common shares on an undiluted basis. Each Subscription Receipt is convertible into one Luca share upon satisfaction or waiver of certain release conditions. In connection with closing the strategic investment, Goldgroup and Luca entered into an investor rights agreement pursuant to which Goldgroup is entitled to certain rights, once, and for so long as, Goldgroup beneficially owns at least 10% of the outstanding Luca shares, including: (a) the right to participate in equity financings and top-up its holdings in relation to dilutive issuances in order to maintain its pro rata ownership interest at the time of such financing; and (b) the right to nominate two persons to the board of directors of Luca.

​

Subsequent to September 30, 2026, the Company issued 2,989,675 common shares as a result of warrant exercises for gross proceeds of approximately $6,353.

​


​

Exhibit 99.4

Graphic

Goldgroup Mining Inc.

Management’s Discussion and Analysis

Financial Condition and Results of Operations

Form 51-102F1

​

Third Quarter – Interim period ended September 30, 2026

(Expressed in U.S. dollars, unless otherwise noted)

​

November 16, 2026

​

This Management’s Discussion and Analysis (“MD&A”) relates to the financial condition and results of operations of Goldgroup Mining Inc. (“Goldgroup” or the “Company”) together with its subsidiaries as of the date of this MD&A and is intended to supplement and complement the Company’s unaudited condensed interim consolidated financial statements for the three and nine months ended September 30, 2026 and 2025. Readers are cautioned that this MD&A contains forward-looking statements and that actual events may vary from management’s expectations. Goldgroup’s public disclosure documents are available on SEDAR+ at www.sedarplus.ca. The condensed interim consolidated financial statements and MD&A are presented in United States (“US”) dollars, except where noted, and have been prepared in accordance with International Financial Reporting Standards (“IFRS”). This discussion addresses matters we consider important for an understanding of our financial condition and results of operations as of and for the three and nine month periods ended September 30, 2026 and 2025.

​

The MD&A contains forward-looking statements and should be read in conjunction with the risks discussed herein and those set out under the heading “Risk Factors” as described in this MD&A. Please also refer to the “Cautionary Statement on Forward-Looking Information” at the end of this MD&A.

​
OVERVIEW

Goldgroup is a Canadian-based mining company focused on becoming a premier intermediate gold and silver producer through disciplined operations, organic growth and strategic acquisitions. Following completion of the merger with Gold Resource Corporation (“Gold Resource” or “GRC”) on July 17, 2026, the Company owns producing mines and development-stage assets in Mexico, together with the Back Forty Project in Michigan. The portfolio provides multiple opportunities for resource growth, production expansion and long-term value creation. To advance some of these assets will require study work, engineering, permitting and financing along with contractual and political risks described elsewhere in this MD&A.

​

The Company’s portfolio includes the producing Don David Gold Mine in Oaxaca, the Cerro Prieto Gold Mine and the San Francisco Project in Sonora, Mexico, together with the Back Forty Project in Michigan, United States. Don David and Back Forty were acquired as part of the merger with Gold Resource Corporation on July 17, 2026.

​

The profitability and operating cash flows of the Company are affected by various factors, including the amount of precious and base metals produced and sold, the market price, operating costs, interest rates, regulatory and environmental compliance, general and administrative costs, the level of exploration and development expenditures, decommissioning and restoration provisions and other discretionary costs. Goldgroup is also exposed to fluctuations in foreign currency exchange rates that can materially impact profitability and cash flow. The Company’s projects are located in Mexico and the United States and are subject to foreign investment risk, including increases in various levels of taxation and royalties, renegotiation of contracts, fuel cost changes, profit sharing law changes, property title risk and political uncertainty. While Goldgroup seeks to manage the level of risk associated with its business, many of the factors affecting these risks are beyond the Company’s control.

​

The Company may need to raise additional funds over and above amounts raised to date to continue the development of Don David and Cerro Prieto, the resource drilling and restart of the San Francisco Project, as well as to complete the exploration and development of its other property interests. There can be no assurance that additional capital or other


Nine months ended – September 30, 2026‌

​

types of financing will be available to the Company if needed or that, if available, the terms of such financing will be on terms favourable to the Company.

​

HIGHLIGHTS AND DEVELOPMENTS – 2026

​

Cerro Prieto

​

●During the three months ended September 30, 2026, Cerro Prieto produced 3,019 ounces of gold (September 30, 2025 – 1,684).

​

●During the nine months ended September 30, 2026, Cerro Prieto produced 10,999 ounces of gold (September 30, 2025 – 5,102).

​

●During the three and nine months ended September 30, 2026, the average realized price per ounce of gold sold was $4,073(1) (September 30, 2025 – $3,356(1)) and $4,424(1) (September 30, 2025 – $3,150(1)), respectively.

​

(1)This is a non-IFRS measure. See “Non-IFRS Financial Measures” of this MD&A for discussion.

​

Don David

​

●During the three months ended September 30, 2026, Don David produced 1,972 ounces of gold and 463,595 ounces of silver, or 8,742 gold equivalent ounces (“GEO”)(2) (September 30, 2025 – 1,645 ounces of gold, 453,057 ounces of silver and 6,933 GEO).

​

●During the nine months ended September 30, 2026, Don David produced 5,761 ounces of gold and 1,260,118 ounces of silver, or 27,228 GEO(2) (September 30, 2025 – 3,307 ounces of gold, 906,777 ounces of silver and 13,518 GEO).

​

●During the three months ended September 30, 2026, Don David also produced 80 tonnes of copper, 556 tonnes of lead and 1,698 tonnes of zinc (September 30, 2025 – 73, 241 and 784 tonnes, respectively).

​

(2)Don David production is presented on a 100% basis for the full periods shown, including periods before the Merger on July 17, 2026. See also “Financial and Operational Highlights – Don David Gold Mine”.

​

Corporate

●On July 17, 2026, the Company and GRC closed the merger (the “Merger”) pursuant to the Arrangement Agreement and Plan of Merger (the “Arrangement Agreement”), dated January 25, 2026 and amended on May 15, 2026, by and among GRC, the Company, and Goldgroup Merger Sub Inc., a wholly owned subsidiary of the Company. As a result of the Merger, GRC shareholders received 0.3619 (the “Exchange Ratio”) post consolidated common shares of Goldgroup for each share of GRC’s common stock held.

​

As a result of the Merger, GRC was delisted from the NYSE American LLC (the “NYSE American”). Concurrently, the Company commenced trading on the NYSE American under the ticker symbol “GORO” and changed its ticker symbol on the TSX Venture Exchange (“TSXV”) from “GGA” to “GORO.” The Company’s common shares were no longer quoted on the OTC Markets upon commencement of trading on the NYSE American. In accordance with the terms of the Arrangement Agreement, the Company and GRC jointly determined the ratio of the share consolidation to be one (1) post-consolidation share for every four (4) pre-consolidation share. In connection with the completion of the Merger, the Company issued 59,132,077 common shares and assumed 275,191 stock options, 458,861 deferred share units, 685,961 restricted share units and 172,584 performance share units, in each case on a post-consolidation basis and reflecting the Exchange Ratio.

​

Upon closing of the Merger, the Company’s board of directors and executive management were reconstituted. Ron Little, Lila Manassa Murphy, Nicole Adshead-Bell, Luis Felipe Medina Aguirre and Francisco Javier

Third Quarter – September 30, 2026‌Page 2

​


Nine months ended – September 30, 2026‌

​

Reyes de la Campa were appointed to the board of directors, and Allen Palmiere was appointed as President and Chief Executive Officer, Chet Holyoak as Chief Financial Officer, and Armando Alexandri as Chief Operating Officer of the Company.

​

●On July 27, 2026, the Company announced the departure of Allen Palmiere as President and Chief Executive Officer. Javier Reyes, Chair of the Board of Directors, was initially appointed Interim Chief Executive Officer but was subsequently appointed as the Chief Executive Officer. Mr. Reyes will continue to work closely with the Company’s experienced executive and operational leadership team to execute the Company’s strategic priorities. Allen Palmiere has become  an advisor of the Company to support the leadership transition.

​

●On September 25, 2026, the Company completed a non-brokered private placement of 33,382,326 units at US$3.65 per unit for gross proceeds of approximately US$121.8 million. Each unit consisted of one common share and one-half of one warrant, with each whole warrant exercisable at a price of US$5.10 per share until March 25, 2028. The proceeds are intended to support working capital, advancement of the Company's mining and development projects, and potential strategic investments and acquisitions.

​

●During the nine months ended September 30, 2026, the Company issued 2,222,110 common shares as a result of warrant exercises for gross proceeds of approximately $1,968,000.

​

●During the nine months ended September 30, 2026, the Company issued 856,250 common shares as a result of option exercises for gross proceeds of approximately $159,000.

​

MATERIAL EVENTS SUBSEQUENT TO SEPTEMBER 30, 2026

​

●On October 14, 2026, the Company acquired 101,123,662 subscription receipts of Luca Mining Corp. (“Luca”) at C$1.00 per subscription receipt for a total investment of C$101.1 million, as part of the bought deal private placement of subscription receipts undertaken by Luca in connection with its proposed acquisition of the Cozamin Mine. Each subscription receipt is convertible into one Luca common share upon the satisfaction or waiver of certain release conditions. Upon completion of the acquisition and conversion of all receipts, the Company would hold approximately 19.9% of Luca’s outstanding common shares on an undiluted basis. In connection with closing the strategic investment, Goldgroup and Luca entered into an investor rights agreement pursuant to which Goldgroup is entitled to certain rights, once, and for so long as, Goldgroup beneficially owns at least 10% of the outstanding Luca shares, including: (a) the right to participate in equity financings and top-up its holdings in relation to dilutive issuances in order to maintain its pro rata ownership interest at the time of such financing; and (b) the right to nominate two persons to the board of directors of Luca.

​

●Subsequent to September 30, 2026, the Company issued 2,989,675 common shares as a result of warrant exercises for gross proceeds of approximately $6,353,000.

OUTLOOK

Main areas of focus for 2026 include:

​

●San Francisco – the Company has commenced a 26,053-metre diamond drilling program focused on upgrading and confirming the existing mineral resource, refining the resource model and evaluating opportunities to expand understanding of mineralized zones within and around the existing pits. Refurbishment of key infrastructure was begun, including the crushing plant, conveyor systems and ADR facility.  In parallel, the Company is advancing a technical study to optimize the design and mine plan and establish the technical basis for a planned March 2027 restart of mining and processing operations, while continuing to assess the project’s broader exploration and resource expansion potential.

​

​

Third Quarter – September 30, 2026‌Page 3

​


Nine months ended – September 30, 2026‌

​

●Don David – the Company plans to focus on underground grade-control, infill and expansion drilling to extend mine life and expand the existing resource base. Regional exploration will also target the Margaritas and El Rey areas, while development at the Alta Gracia satellite operation is expected to continue providing additional mill feed. The Company sees further upside from important high-grade zones and the broader 55,000-hectare land package surrounding the mine.

​

●Back Forty – the Company is advancing a definitive feasibility study and intends to commence the permitting process as it moves the project toward a potential development decision, subject to the resolution of matters relating to the Stream Agreements (as defined below) described under “Back Forty Project, United States”. The current mine plan contemplates a combined open-pit and underground operation with a 2,500-tonne-per-day processing plant.

​

●Cerro Prieto – the Company is pursuing exploration of nearby areas within our concessions to extend mine life and potentially increase production. The Company has installed a second crushing circuit in fiscal 2025 to expand average crushing capacity to 4,200 tonnes per day. The Company is analyzing re-leaching material from existing leach pads to potentially extract residual gold from previously leached material, which may increase future gold production.

​

●San José de Gracia – the Company announced that its subsidiary, Goldgroup Resources Inc. (“Goldgroup Resources”), filed a Request for Arbitration on February 17, 2023 with the International Centre for Settlement of Investment Disputes (“ICSID”) against the United Mexican States. The treatment and inaction by the Mexican courts have resulted in a judicial expropriation of Goldgroup Resources’ investment in DynaResource de Mexico S.A. de C.V. (“DynaMexico”) and a denial of justice in breach of Mexico’s obligations under the North American Free Trade Agreement (“NAFTA”). Goldgroup Resources is seeking monetary damages as a result of Mexico’s breaches of NAFTA, as well as declarations from the arbitral tribunal to counter any potentially detrimental consequences stemming from the continued existence of the $48 million judgment issued by the Mexican courts in favour of DynaMexico. The NAFTA hearing concluded on June 3, 2026, and the Company is awaiting a ruling from the tribunal.

​

Going concern

​

The Company has experienced recurring operating losses and has an accumulated deficit of $237.0 million as at September 30, 2026. In addition, as at September 30, 2026, the Company has a working capital of $14.9 million. Working capital is defined as current assets less current liabilities and provides a measure of the Company’s ability to settle liabilities that are due within one year with assets that are also expected to be converted into cash within one year.

​

In assessing the Company's ability to continue as a going concern, management has considered the anticipated contribution of operating cash flows from the post-Merger combined group's expanded portfolio of producing mines. Notwithstanding the completion of the Merger, the Company continues to have an accumulated deficit and a history of recurring operating losses, and management's ability to fund the combined group's operations, service its obligations as they come due, and advance its planned work programs remains dependent on its ability to generate future profitable operations and/or obtain the necessary financing to conduct its planned work program on its mineral properties, meet its on-going levels of corporate overhead and commitments, keep its properties in good standing and discharge its liabilities as they come due. 

​

These matters result in material uncertainties which may cast significant doubt about the Company’s ability to continue as a going concern. The condensed interim consolidated financial statements do not include any adjustments that would be necessary if the going concern assumption were not appropriate. If the going concern basis was not appropriate for the condensed interim consolidated financial statements, then adjustments would be necessary in the carrying value of assets and liabilities, the reported revenues and expenses, and the classifications used in the statement of financial position.  

​

Third Quarter – September 30, 2026‌Page 4

​


Nine months ended – September 30, 2026‌

​

FINANCIAL AND OPERATIONAL HIGHLIGHTS

​

​

​

​

​

​

​

​

​

​

​

​

​

Cerro Prieto – Operating Statistics

​

Three months ended

Sept. 30, 2026

​

Three months ended

Sept. 30, 2025

​

Nine months ended

Sept. 30, 2026

​

Nine months ended

Sept. 30, 2025

High-grade ore mined (t)  

​

264,300

​

545,480

​

914,300

​

798,887

Low grade ore mined (t)

​

65,900

​

-

​

65,900

​

-

Run of mine (t)

​

-

​

149,039

​

50,889

​

149,039

Waste mined (tonnes)

​

2,577,127

​

2,375,215

​

7,440,064

​

3,287,677

Total mined (tonnes)

​

2,907,327

​

3,069,734

​

8,471,153

​

4,235,603

Waste-to-ore-ratio

​

7.80

​

3.42

​

7.22

​

3.47

Ore to pad (t)

​

379,331

​

194,479

​

976,024

​

582,521

ROM to pad (t)

​

-

​

149,039

​

50,889

​

149,039

Recovery

​

61%

​

28%

​

71%

​

39%

Grade of ore mined (g/t Au)

​

0.46

​

0.62

​

0.52

​

0.62

Grade of ROM mined (g/t Au)

​

-

​

0.55

​

0.41

​

0.55

Grade of ore placed on pad (g/t Au)

​

0.41

​

0.55

​

0.45

​

0.55

Grade of ROM placed on pad (g/t Au)

​

-

​

0.55

​

0.41

​

0.55

Gold ounces – produced

​

3,019

​

1,684

​

10,999

​

5,102

Gold ounces – sold

​

3,040

​

1,096

​

12,293

​

4,287

Average realized gold price per ounce sold(1)

$

4,073

$

3,356

$

4,424

$

3,150

​

(1)This is a non-IFRS measure. See “Non-IFRS Financial Measures” of this MD&A for discussion.

Three months ended September 30, 2026 compared to three months ended September 30, 2025

High-grade ore mined decreased to 264,300 tonnes from 545,480 tonnes, while low-grade ore mined totalled 65,900 tonnes. Total material placed on the leach pads increased to 379,331 tonnes from 343,518 tonnes, despite a decrease in the grade of ore placed to 0.41 g/t Au from 0.55 g/t Au. In the prior-year quarter, installation of the second crushing circuit caused downtime, and ROM material placed on the pads late in the quarter took longer to leach. Recovery increased to 61% from 28%, and gold production increased 79% to 3,019 ounces from 1,684 ounces. The waste-to-ore ratio increased to 7.80 from 3.42, reflecting increased stripping at the Esperanza Extension. Gold sales increased to 3,040 ounces from 1,096 ounces, and the average realized gold price increased to $4,073 per ounce(1) from $3,356 per ounce(1).

Nine months ended September 30, 2026 compared to nine months ended September 30, 2025

High-grade ore mined increased to 914,300 tonnes from 798,887 tonnes, and low-grade ore mined totalled 65,900 tonnes. Total material placed on the leach pads, including ROM, increased to 1,026,913 tonnes from 731,560 tonnes. The grade of ore placed decreased to 0.45 g/t Au from 0.55 g/t Au, while recovery increased to 71% from 39%. Higher volumes placed on the pads and improved recovery more than offset the lower grade, and gold production increased 116% to 10,999 ounces from 5,102 ounces. Recovery for the period benefited from the drawdown of previously accumulated leach pad inventory in the first quarter and improvements to crushing and leaching. The waste-to-ore ratio

Third Quarter – September 30, 2026‌Page 5

​


Nine months ended – September 30, 2026‌

​

increased to 7.22 from 3.47, reflecting increased stripping at the Esperanza Extension. Gold sales increased to 12,293 ounces from 4,287 ounces, and the average realized gold price increased to $4,424 per ounce(1) from $3,150 per ounce(1).

(1)This is a non-IFRS measure. See “Non-IFRS Financial Measures” of this MD&A for discussion.

Don David Gold Mine

The Don David Gold Mine was acquired on completion of the Merger on July 17, 2026. To give a meaningful view of the operation, the table below presents Don David’s operating results on a 100% basis for each full period shown, including the periods before the Merger when Don David was owned by GRC. The Company’s consolidated financial results include Don David only from July 17, 2026 (see “Basis of presentation” below).

​

​

​

​

​

​

​

​

​

Don David – Operating Statistics(1)

Three months ended

Sept. 30, 2026

Three months ended

Sept. 30, 2025

Nine months ended

Sept. 30, 2026

Nine months ended

Sept. 30, 2025

Tonnes Mined

87,763

63,208

245,199

184,907

Tonnes Processed

87,946

65,131

255,497

185,516

Tonnes Processed per Operating Day

1,426

1,124

1,428

1,144

Waste

100,139

85,597

262,797

179,172

Grade:

​

​

​

​

Average Gold Grade g/t

0.91

1.11

0.91

0.80

Average Silver Grade g/t

199

250

189

179

Average Copper Grade %

0.14

0.16

0.14

0.16

Average Lead Grade %

0.83

0.63

0.77

0.74

Average Zinc Grade %

2.30

1.57

2.10

2.00

Recoveries:

​

​

​

​

Average Gold Recovery %

76%

71%

77%

70%

Average Silver Recovery %

82%

86%

81%

85%

Average Copper Recovery %

64%

68%

64%

60%

Average Lead Recovery %

76%

59%

74%

64%

Average Zinc Recovery %

84%

77%

82%

77%

Gross Metal Produced:

​

​

​

​

Gold (ozs.)

1,972

1,645

5,761

3,307

Silver (ozs.)

463,595

453,057

1,260,118

906,777

Copper (tonnes)

80

73

236

177

Lead (tonnes)

556

241

1,443

886

Zinc (tonnes)

1,698

784

4,396

2,863

Total Gold and Gold Equivalent (ounces) produced(2)

8,742

6,933

27,228

13,518

Net Payable metal sold

​

​

​

​

Gold (ozs.)

1,625

1,423

4,528

3,159

Silver (ozs.)

438,402

417,711

1,171,221

798,395

Copper (tonnes)

72

67

217

160

Lead (tonnes)

523

213

1,343

761

Zinc (tonnes)

1,814

645

3,666

2,322

Total Gold and Gold Equivalent (ounces) sold(2)

8,027

6,298

24,481

12,150

Third Quarter – September 30, 2026‌Page 6

​


Nine months ended – September 30, 2026‌

​

(1)

Presented on a 100% basis for the full periods shown, including periods before the Merger on July 17, 2026, which are not included in the Company’s consolidated financial results.

(2)

Gold equivalent ounces include gold and silver only. Silver is converted to gold equivalent ounces using the ratio of the average realized silver price to the average realized gold price for each period. The copper, lead and zinc sales realized for each period are excluded.

Three months ended September 30, 2026 compared to three months ended September 30, 2025

Ore milled increased 35% to 87,946 tonnes from 65,131 tonnes, and throughput increased to 1,426 tonnes per day from 1,124 tonnes per day. The average gold grade decreased to 0.91 g/t from 1.11 g/t and the average silver grade decreased to 199 g/t from 250 g/t, while gold recovery improved to 76% from 71%. Higher throughput and recovery more than offset the lower gold grade, and gold production increased 20% to 1,972 ounces from 1,645 ounces. Silver production increased 2% to 463,595 ounces from 453,057 ounces. Higher lead and zinc grades and recoveries increased zinc production 116% to 1,698 tonnes from 784 tonnes and lead production 131% to 556 tonnes from 241 tonnes. Gold equivalent production increased 26% to 8,742 GEO from 6,933 GEO.

Nine months ended September 30, 2026 compared to nine months ended September 30, 2025

Ore milled increased 38% to 255,497 tonnes from 185,516 tonnes, and throughput increased to 1,428 tonnes per day from 1,144 tonnes per day. The average gold grade increased to 0.91 g/t from 0.80 g/t and gold recovery improved to 77% from 70%, and gold production increased 74% to 5,761 ounces from 3,307 ounces. Silver production increased 39% to 1,260,118 ounces from 906,777 ounces, reflecting higher throughput and a higher silver grade of 189 g/t compared to 179 g/t, partly offset by lower silver recovery of 81% compared to 85%. Gold equivalent production increased 101% to 27,228 GEO from 13,518 GEO.

​

(tabled amounts are expressed in thousands of U.S dollars)

​

Three months ended Sept. 30,

​

Nine months ended Sept. 30,

​

​

2026

​

2025

​

2026

​

2025

Sales, Net

  ​ ​ ​

$

57,060

  ​ ​ ​

$

3,707

  ​ ​ ​

$

99,361

  ​ ​ ​

$

13,651

Cost of Sales

​

​

​

​

​

​

​

​

​

​

​

​

Production Costs

​

​

(38,904)

​

​

(6,105)

​

​

(72,038)

​

​

(12,335)

Depreciation and Depletion Expense

​

​

(32,398)

​

​

(142)

​

​

(33,246)

​

​

(494)

Reclamation and Remediation Expense

​

​

(674)

​

​

-

​

​

(674)

​

​

-

Mine Gross Profit (Loss)

​

​

(14,916)

​

​

(2,540)

​

​

(6,597)

​

​

822

Share-based compensation

​

​

(2,873)

​

​

(2)

​

​

(2,873)

​

​

(33)

General and administrative

​

​

(3,113)

​

​

(2,233)

​

​

(10,112)

​

​

(4,301)

Care and maintenance – San Francisco

​

​

475

​

​

-

​

​

(2,067)

​

​

-

Exploration expense

​

​

(805)

​

​

-

​

​

(966)

​

​

-

Impairment

​

​

(2,000)

​

​

-

​

​

(2,000)

​

​

(27,648)

Unrealized derivative gain (loss) – warrant liability

​

​

16,153

​

​

(413)

​

​

18,980

​

​

(16,156)

Other (expense) income

​

​

(6,260)

​

​

419

​

​

(6,116)

​

​

200

Profit (loss) before income taxes

​

​

(13,339)

​

​

(4,769)

​

​

(11,751)

​

​

(47,116)

Income tax (expense) benefit

​

​

3,102

​

​

(4)

​

​

1,786

​

​

-

Net Loss

​

$

(10,237)

​

$

(4,773)

​

$

(9,965)

​

$

(47,116)

Loss per share – Basic

​

$

(0.08)

​

$

(0.07)

​

$

(0.11)

​

$

(0.90)

Loss per share – Diluted

​

$

(0.20)

​

$

(0.07)

​

$

(0.30)

​

$

(0.90)

Weighted average shares outstanding (000’s)

​

​

​

​

​

​

​

​

​

​

​

​

Basic

​

​

127,150

​

​

70,018

​

​

92,048

​

​

52,536

Diluted

​

​

132,175

​

​

70,018

​

​

98,940

​

​

52,536

Total shares issued and outstanding (000’s)

​

​

168,997

​

​

72,899

​

​

168,997

​

​

72,899

​

​

Third Quarter – September 30, 2026‌Page 7

​


Nine months ended – September 30, 2026‌

​

​

​

As at September 30,

(tabled amounts are expressed in thousands of U.S dollars)

​

2026

​

2025

Cash and cash equivalents

  ​ ​ ​

$

168,388

  ​ ​ ​

$

13,446

Total assets

​

​

653,460

​

​

47,722

Non-current financial liabilities

​

​

8,607

​

​

31

Cash dividends declared

​

$

0.00

​

$

0.00

​

Basis of presentation

The Merger with Gold Resource closed on July 17, 2026. The results for the three and nine months ended September 30, 2026 therefore include Gold Resource’s operations, principally the Don David Gold Mine, from July 17, 2026 onward. The comparative periods reflect Goldgroup on a standalone basis, so the periods are not directly comparable. The current period results also reflect the preliminary purchase price allocation, including depreciation and depletion of the fair value increases recognized on Gold Resource’s mineral interests and property, plant and equipment.

Three months ended September 30, 2026 compared to three months ended September 30, 2025

Revenue increased to $57.06 million from $3.71 million in the comparative period. Gold Resource contributed $44.39 million from the Don David Gold Mine following the Merger.

Production costs increased to $38.90 million from $6.11 million. Of this, $25.41 million related to Gold Resource, and the remaining increase reflected higher mining and processing activity at Cerro Prieto.

Depreciation and depletion increased to $32.40 million from $142,000. This included $25.54 million of non-cash depreciation and depletion of the fair value adjustments recognized on acquisition. The Company also recorded reclamation and remediation expense of $674,000 at the Don David Gold Mine. As a result, the Company recorded a mine gross loss of $14.92 million compared to $2.54 million in the comparative period.

Share-based compensation increased to $2.87 million from $2,000. This related to options granted to directors prior to closing of the Merger and Gold Resource replacement awards assumed on closing.

General and administrative expenses increased to $3.11 million from $2.23 million. The increase was primarily due to professional fees related to the Merger, the NYSE American listing and the September 2026 private placement, higher investor relations costs following the NYSE American listing, and the inclusion of Gold Resource’s corporate costs.

Care and maintenance and exploration costs were $330,000 compared to $nil in the comparative period. Exploration of $805,000 at the Don David Gold Mine was partially offset by a $475,000 recovery of San Francisco care and maintenance costs that were reclassified to capitalized refurbishment costs.

The Company recorded an impairment of $2.00 million on the promissory note receivable from the sale of the Pinos Project, which was not settled on its August 27, 2026 due date.

The unrealized gain on the warrant liability was $16.15 million compared to a loss of $413,000 in the comparative period. The gain reflected a lower share price at September 30, 2026, the shorter remaining life of the outstanding warrants, and warrant exercises.

Other expense was $6.26 million compared to other income of $419,000 in the comparative period. The current period primarily reflects:

●a $2.56 million severance payment to Gold Resource’s former Chief Executive Officer;
●a $2.50 million change in the fair value gold and silver stream liabilities; and
●finance costs on the San Francisco royalty payable and asset retirement obligations.

​

Third Quarter – September 30, 2026‌Page 8

​


Nine months ended – September 30, 2026‌

​

The comparative period included a $306,000 recovery of exploration costs that were capitalized during that quarter.

As a result of the foregoing, the loss before income taxes was $13.34 million compared to $4.77 million in the comparative period. The Company recorded an income tax recovery of $3.10 million, compared to an expense of $4,000. This comprised a deferred income tax and special mining duty recovery of $10.02 million, partially offset by current income tax of $5.16 million and current special mining duty of $1.76 million. The net loss was $10.24 million compared to $4.77 million in the comparative period.

Nine months ended September 30, 2026 compared to nine months ended September 30, 2025

Revenue increased to $99.36 million from $13.65 million. Gold Resource contributed $44.39 million following the Merger. Revenue from Cerro Prieto increased to $54.97 million from $13.65 million, reflecting higher gold sales volumes (12,293 ounces compared to 4,287 ounces) and a higher realized gold price ($4,424 per ounce compared to $3,150 per ounce).

Production costs increased to $72.04 million from $12.34 million. Of this, $25.41 million related to Gold Resource, and the remainder reflected higher activity at Cerro Prieto and the sale of inventory built up at the end of 2025.

Depreciation and depletion increased to $33.25 million from $494,000, primarily due to $25.54 million of depreciation and depletion of the acquisition-date fair value adjustments. Together with $674,000 of reclamation and remediation expense, this resulted in a mine gross loss of $6.60 million compared to a mine gross profit of $822,000.

Share-based compensation increased to $2.87 million from $33,000 as a result of awards granted and assumed on closing of the Merger.

General and administrative expenses increased to $10.11 million from $4.30 million. The increase was primarily due to:

●higher professional fees related to the Merger, the NYSE American listing, the private placement and the NAFTA arbitration hearing, including $2.48 million of acquisition-related costs expensed under IFRS 3;
●higher salaries and investor relations costs; and
●the inclusion of Gold Resource’s corporate costs from July 17, 2026 to September 30, 2026.

Care and maintenance and exploration costs were $3.03 million compared to $nil. These comprised care and maintenance at the San Francisco Project, acquired in December 2025, of $2.07 million, exploration at the Don David Gold Mine of $805,000, and other exploration costs of $161,000 incurred in the six months ended June 30, 2026.

The Company recorded an impairment of $2.00 million on the Pinos promissory note, compared to a $27.65 million impairment of the Pinos Project in the comparative period.

The unrealized gain on the warrant liability was $18.98 million compared to a loss of $16.16 million. The 2026 gain reflected time decay, lower volatility and a lower share price at September 30, 2026. The 2025 loss reflected a significant increase in the Company’s share price.

Other expense was $6.12 million compared to other income of $200,000. The change was primarily due to:

●the $2.56 million severance payment and $2.50 million of stream liability change in fair value at Gold Resource; and
●finance costs of $1.66 million related to accretion on the San Francisco royalty payable and asset retirement obligations.

The loss before income taxes was $11.75 million compared to $47.12 million. The Company recorded an income tax recovery of $1.79 million compared to $nil. The $10.02 million deferred income tax and special mining duty recovery was partially offset by current income tax of $5.60 million and current special mining duty of $2.63 million. The net loss was $9.97 million compared to $47.12 million in the comparative period.

​

Third Quarter – September 30, 2026‌Page 9

​


Nine months ended – September 30, 2026‌

​

Selected financial information

Cash and cash equivalents were $168.39 million as at September 30, 2026, compared to $13.45 million as at September 30, 2025. The increase primarily reflects the $121.8 million private placement completed on September 25, 2026 and $42.6 million of cash acquired on closing of the Merger.

Total assets increased to $653.46 million from $47.72 million. This was primarily due to the completion of the Merger, including the recognition of Gold Resource’s mineral interests and property, plant and equipment at fair value, together with the San Francisco Project acquired in December 2025 and the proceeds of the private placement completed on September 25, 2026.

Non-current financial liabilities increased to $8.61 million from $31,000. This primarily reflects liabilities assumed on the Merger, including contingent consideration related to the Back Forty Project and cash-settled share unit liabilities, together with the non-current portion of the San Francisco royalty payable.

QUARTERLY RESULTS

(tabled amounts are expressed in thousands of U.S. dollars)

Q3 2026

Q2 2026

Q1 2026

Q4 2025

Q3 2025

Q2 2025

Q1 2025

Q4 2024

Revenue

57,060

21,106

21,195

9,330

3,707

5,364

4,580

3,931

Income (loss) from mine operations

(14,916)

5,207

3,112

4,436

(2,540)

1,705

1,657

(102)

Net income (loss)

(10,237)

(6,080)

6,352

(21,272)

(4,773)

(35,130)

(7,213)

(1,765)

Basic earnings (loss) per share

(0.08)

(0.08)

0.08

(0.29)

(0.07)

(0.70)

(0.25)

(0.08)

Diluted earnings (loss) per share

(0.20)

(0.08)

0.08

(0.29)

(0.07)

(0.70)

(0.25)

(0.08)

Cash and cash equivalents

168,388

15,715

15,366

9,611

13,446

15,122

7,827

366

Total assets

653,460

69,289

67,316

71,664

47,722

36,105

16,065

6,215

Non-current financial liabilities

8,607

4,181

3,434

4,061

31

33

35

15

Cash dividend declared

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

​

Diluted loss per share for the three and nine months ended September 30, 2026 is greater than basic loss per share because, under IAS 33, the unrealized gains on the warrant liability and the deferred share unit liability are excluded from the loss and the related warrants and deferred share units are included in the weighted average number of shares.

Three months ended September 30, 2026 statement of losses compared with previous quarters in 2026, 2025 and 2024

Revenue has fluctuated over the comparative quarters as a result of changes in production, sales volumes, realized metal prices and the areas being mined, and in the current quarter as a result of the Merger. Revenue in the current period was $57.06 million, significantly higher than all comparative quarters presented. The increase reflects the inclusion of $44.39 million of revenue from the Don David Gold Mine from July 17, 2026 to September 30, 2026. Cerro Prieto contributed $12.67 million from 3,040 ounces of gold sold at an average realized price of $4,073 per ounce(1).

The Company recorded a loss from mine operations of $14.92 million in the current period, compared to income of $5.21 million in Q2 2026 and $3.11 million in Q1 2026. The loss was driven by $25.54 million of non-cash depreciation and depletion of the fair value adjustments recognized on Gold Resource’s mineral interests and property, plant and equipment on acquisition. Lower margins at Cerro Prieto, due to lower grades and higher production costs, also contributed.

The Company recorded a net loss of $10.24 million in the current quarter, compared to a net loss of $6.08 million in Q2 2026 and net income of $6.35 million in Q1 2026. The current-period net loss was primarily impacted by:

●the loss from mine operations described above;
●share-based compensation of $2.87 million related to the Merger;

​

Third Quarter – September 30, 2026‌Page 10

​


Nine months ended – September 30, 2026‌

​

●professional fees associated with the Merger, the NYSE American listing and the September 2026 private placement;
●a $2.56 million severance payment to Gold Resource’s former Chief Executive Officer;
●the change in fair value of the gold and silver stream liabilities; and
●a $2.00 million impairment of the Pinos promissory note.

These were partially offset by a $16.15 million unrealized gain on the warrant liability and an income tax recovery of $3.10 million.

Total assets and non-current liabilities as at September 30, 2026 compared with previous quarters in 2026, 2025 and 2024.

Total assets were $653.46 million as at September 30, 2026, a substantial increase from $69.29 million at June 30, 2026 and all other comparative quarters. The increase primarily reflects the completion of the Merger, including the recognition of Gold Resource’s mineral interests and property, plant and equipment at fair value. It also reflects the higher cash balance following the private placement for gross proceeds of $121.8 million completed on September 25, 2026.

Non-current financial liabilities were $8.61 million as at September 30, 2026, compared to $4.18 million at June 30, 2026 and $3.43 million at March 31, 2026. The balance now primarily reflects liabilities assumed on completion of the Merger, including contingent consideration related to the Back Forty Project and cash-settled share unit liabilities, together with the non-current portion of the San Francisco royalty payable.

DON DAVID GOLD MINE, MEXICO

The Don David Gold Mine (“Don David”) was acquired upon completion of the Merger with GRC on July 17, 2026. The Don David complex in Oaxaca, Mexico is owned through Don David Gold Mexico S.A. de C.V. and includes two producing underground mines, Arista and Alta Gracia. Commercial production at the complex began in July 2010. Mining at Alta Gracia resumed on February 20, 2026. The operation produces gold, silver, copper, lead and zinc through concentrates from polymetallic mineralization.

The Don David properties consist of six mineral properties located along the San Jose structural corridor in Oaxaca. Collectively, the properties cover approximately 55 continuous kilometres of the structural corridor and extend across three historic mining districts, providing a significant regional land position for ongoing exploration and development.

Arista is the principal underground mine and hosts the Arista, Switchback and Three Sisters vein systems. Underground mining is conducted using a combination of cut-and-fill and long-hole mining methods. Ore from both Arista and Alta Gracia is transported to the Aguila processing facility, which includes flotation and agitated leach circuits capable of producing doré and separate zinc, lead-silver and copper-gold concentrates. The operation is supported by existing mine development, processing and tailings facilities, electrical infrastructure, water storage, laboratories, workshops, offices and other site infrastructure.

A significant component of the Company’s recent operating and exploration strategy has been the development and definition of higher-grade areas within the existing mine. Development and drilling at Arista have focused on the Three Sisters vein system and selected areas of the Arista system to provide additional production areas, improve mine sequencing and increase operating flexibility. Exploration potential includes extensions of the Arista, Switchback and Three Sisters vein systems, which remain open in several directions.

In addition to near-mine exploration, Don David maintains a number of regional exploration projects along the San Jose structural corridor. Historical exploration has identified prospective areas, including Alta Gracia, Margaritas, El Rey, Jabalí and other targets. The Company’s exploration programs have focused on evaluating and prioritizing these projects for their potential to provide additional mineral resources and, where appropriate, future satellite feed for the existing Don David processing infrastructure.

See the technical report in respect of Don David with an effective date of December 31, 2025 available under the Company’s profile on SEDAR+ at www.sedarplus.ca.

​

Third Quarter – September 30, 2026‌Page 11

​


Nine months ended – September 30, 2026‌

​

SAN FRANCISCO PROJECT, MEXICO

On December 23, 2025, the Company acquired all of the issued and outstanding Series “A” shares in the fixed capital and all the issued and outstanding Series “B” shares in the variable capital of Molimentales del Noroeste, S.A. de C.V. (“Molimentales”) through a Concurso Mercantil process (restructuring proceeding equivalent to Chapter 11 in the United States). The Company has received approval from the Second District Court for Commercial Bankruptcy Matters (the “Mexican Court”) to the plan of arrangement the Company filed with the Mexican Court under the Concurso Mercantil process.

​

The San Francisco Project is situated in the north central portion of the state of Sonora, Mexico, approximately 150 kilometres (km) north of the state capital, Hermosillo. The San Francisco Project is comprised of two previously mined open pits (San Francisco and La Chicharra), together with heap leach processing facilities and associated infrastructure located close to the San Francisco pit. At this time, the leach pads are no longer producing, no mining is being conducted, and the project is on care and maintenance.

​

The Company’s San Francisco Project has the following obligations owed to SA Targeted Investing Corp., a subsidiary of Royal Gold, Inc. (“Royal Gold”):

​

(i)Gold Delivery: Commencing 5 (five) business days after restart of operations, and every month thereafter, deliver 75 gold ounces per month for 20 months to Royal Gold;

​

(ii)Net Smelter Royalty: the Company will pay to Royal Gold a 1% NSR on each of the following mining concessions: San Francisco, Patricia, Norma, La Pima, Dulce, and San Judas. The NSR will commence once the Gold Delivery obligation is complete.

​

Technical Report

​

On May 11, 2026, the Company filed a technical report on the San Francisco Project entitled “NI 43-101 Technical Report for the San Francisco Project, Sonora, Mexico” with an effective date of April 30, 2026 (the “San Francisco Report”), and prepared by William J. Lewis, B.Sc., P.Geo., Richard M. Gowans, P.Eng., and Tudorel Ciuculescu, B.Sc., M.Sc., P. Geo., each of Micon International. The San Francisco Report is available under Goldgroup’s profile on SEDAR+ at www.sedarplus.ca.

​

The San Francisco Report highlights a robust project with significant gold resources and strong upside potential:

​

●Current Measured & Indicated (M&I) mineral resources are estimated at 105,000K tonnes with an average grade of 0.36 g/t gold and containing approximately 1.23 million oz gold with 17,268K tonnes of Inferred resources with an average grade of 0.32 g/t gold containing approximately 178K oz gold, each with an effective date of April 30, 2026. See the San Francisco Report for more information, including with respect to the sampling, analytical, and test data underlying the information, data verification process, and key assumptions, parameters, and methods used.
●Additionally, the San Francisco Report states that the moderately drilled El Llano zone, contiguous to the San Francisco pit, presents an Exploration Target based on widespread drilling potentially containing between 40 million tonnes at 0.61g/t Au (possible 788,000 oz Au) to 78 million tonnes at 0.38g/t Au (possible 960,000 oz Au). These potential quantity and grades are conceptual in nature, there has been insufficient exploration drilling to define a compliant mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource. See the San Francisco Report for more information, including the basis on which the potential quantity and grade have been determined.
●The San Francisco Project is fully permitted for a rapid restart of mining operations and is comprised of two open pits with historic production up to 2023 (San Francisco and La Chicharra), together with heap leach processing facilities and associated infrastructure located close to the San Francisco pit.
●Historic production from the project between 2010 and 2023, before being acquired by Goldgroup, was 1,299,502 ounces. The project still contains a significant mineral resource of gold ounces, as outlined herein, and potential to discover additional mineral resources within its mining concessions.
●The San Francisco deposits are roughly tabular with multiple phases of gold mineralization with gold occurring principally as free gold. The deposits strike 60º to 65º west, dip to the northeast, range in thickness from 4 to 50 metres (m), extend over 1,500 m along strike and are open along strike.

Third Quarter – September 30, 2026‌Page 12

​


Nine months ended – September 30, 2026‌

​

●There have been no processing factors or deleterious elements identified that have had a material negative effect on historic economic extraction. Gold is recovered from the mineralization mined from the San Francisco and La Chicharra deposits by using conventional crushing and heap leach technology.
●There is an extensive database of 719,247 m of drilling for the entire property, including exploration drilling outside the San Francisco and La Chicharra pits. This large drilling database is a valuable asset as it directly underpins the understanding of the deposits and supports a robust geological model as well as future exploration and expansion planning.

CERRO PRIETO PROJECT, MEXICO

​

Overview

​

The Cerro Prieto project, located in the Cucurpe Mining District, Sonora, Mexico, is comprised of the San Felix (205 ha), San Francisco (10 ha), Elba (5.82 ha), Huerta de Oro (20 ha), Reyna de Plata (9.79 ha), Cerro Prieto “North” (2,508 ha) and Argonauta 6 (4,120 ha) mineral concessions. Cerro Prieto is 52 road kilometers from the regional center of Magdalena de Kino (population 40,000) and 150 kilometers northeast of the city of Hermosillo.

​

Gold is produced in doré in Mexico and then shipped to a refiner in the United States for final refining prior to sale. Cerro Prieto is subject to a 2% NSR royalty payable upon production.

​

On November 6, 2025, the Company filed an updated technical report on the Cerro Prieto gold project entitled “Cerro Prieto Project, Heap Leach Project, Magdalena de Kino, State of Sonora, Mexico” with an effective date of April 4, 2025 (the “Cerro Prieto Report”). The Cerro Prieto Report was prepared by Rodrigo R Carneiro MSc, QP, SME Registered Member, José Antonio Olmedo MSc, P. Eng. Geo, QP, SME Registered Member and Cristian Garcia, P. Eng., QP, Registered at Engineers and Geoscientists of British Columbia and independent of the Company, and is available under Goldgroup’s profile on SEDAR+ at www.sedarplus.ca.

​

The Cerro Prieto Report provides an independent assessment of the Mineral Resources Estimates of the Esperanzas Deposit within the Cerro Prieto Mine, which includes the La Esperanza and Nueva Esperanza contiguous zones.  

​

The Cerro Prieto Report highlights the potential of the Esperanzas Deposit area and other nearby targets. The Company commenced exploitation of Esperanzas and exploration of other areas and has, as well, begun preparations for potential leach pad reprocessing, an important optimization initiative that may further increase gold production at the mine.

​

The following table presents the Measured and Indicated mineral resource estimates, and the Inferred mineral resource estimate at the Esperanzas Deposit at a cut-off grade of 0.20 g/t gold.

​

Measured and Indicated Mineral Resources effective as of April 4, 2025

​

Cut-Off Grade Au (g/t)

Class

Volume (m3)

Density (g/cm3)

Mass (t)

Average Au Grade (g/t)

Material Content Au (Oz)

≥ 0.200

Measured

1,212,375

2.33

2,826,313

0.370

33,954

Indicated

133,750

2.26

302,530

0.330

3,255

Measured + Indicated

1,346,125

2.32

3,128,843

0.370

37,209

​

Inferred Mineral Resources effective as of April 4, 2025

​

​

​

​

​

​

​

​

​

​

​

​

Cut-off Au Grade (g/t)

Class

Volume (m3)

Density (g/cm3)

Mass (t)

Average Au
Grade (g/t)

Material Au Content (Oz)

≥ 0.200

Inferred

60,750

2.17

131,536

0.360

1,504

​

Third Quarter – September 30, 2026‌Page 13

​


Nine months ended – September 30, 2026‌

​

See the Cerro Prieto Report for more information, including with respect to the sampling, analytical, and test data underlying the information, data verification process, and key assumptions, parameters, and methods used.

​

The Company is currently conducting an exploration program at Cerro Prieto, which involves diamond drilling along the main mineralized structures as well as definition drilling in specific areas of interest.

​

BACK FORTY PROJECT, UNITED STATES

​

The Back Forty Project (“Back Forty”) was acquired upon completion of the Merger with GRC on July 17, 2026. Back Forty is a 100%-owned advanced-stage polymetallic development project located in Menominee County in Michigan’s Upper Peninsula, United States. GRC acquired the project through its acquisition of Aquila Resources Inc. in December 2021. Back Forty hosts a gold-rich volcanogenic massive sulphide deposit containing gold, silver, zinc, copper and lead.

​

The project comprises approximately 1,300 hectares of private and State of Michigan mineral lands and has been the subject of substantial historical exploration, engineering, metallurgical, environmental and permitting work. Prior to GRC’s acquisition, Aquila and its joint venture partners had undertaken extensive exploration and project development work on the property.

​

The current development concept is a combined open-pit and underground mining operation together with an approximately 2,500-tonne-per-day processing facility and associated infrastructure. If developed, the project would be expected to produce gold and silver doré as well as copper and zinc concentrates containing payable gold and silver.

​

GRC completed additional metallurgical and economic optimization work during 2023 and filed an S-K 1300 Technical Report Summary in October 2023, with an effective date of September 30, 2023. The updated development concept was intended to improve project economics and reduce environmental impacts, including avoiding impacts to wetlands, which management believed would support the project’s future permitting process.

​

Following a period of limited advancement while GRC focused its available capital on Don David, GRC made a strategic decision in late 2025 to resume development activities at Back Forty. In April 2026, GRC engaged Responsible Mining Solutions Corp., part of SLR Consulting Ltd., to complete a comprehensive feasibility study intended to support the permitting process and advance the project toward a development decision.

​

The Back Forty Project is subject to gold and silver streaming arrangements with Osisko Bermuda Limited, now OR Royalties Inc. (“OR Royalties”). Under these arrangements (the “Stream Agreements”), OR Royalties previously advanced an aggregate of $37.2 million in exchange for a portion of future gold and silver production from the project. The Stream Agreements provide for additional funding upon achievement of certain development and financing milestones and also contain customary provisions regarding default and security.

​

The gold stream agreement was amended to extend the deadline for obtaining all material permits required to construct and operate the Back Forty Project from June 30, 2026 to August 31, 2026. The grace period runs to November 30, 2026, and if the permitting milestone is not achieved by such date and the Stream Agreements are not further amended on acceptable terms or at all, and the Company’s subsidiary, Aquila Resources Inc. (“Aquila”), defaults under the Stream Agreements, Aquila may be required to repay amounts previously advanced, together with applicable interest. OR Royalties may also be entitled to exercise its rights as a secured party, including by taking possession of the Back Forty assets.

​

Back Forty is considered a longer-term growth asset within the Company’s portfolio. Advancement of the project is expected to focus on completion of the feasibility study, permitting and subsequent evaluation of a development decision and project financing; however, the timing and extent of further advancement will depend on, among other things, the Company’s ability to address the permitting milestone and related default risk under the Stream Agreements.

​

Third Quarter – September 30, 2026‌Page 14

​


Nine months ended – September 30, 2026‌

​

NAFTA CLAIM

​

Overview

​

On September 1, 2006, the Company entered into an Earn in/Option Agreement with DynaMexico and its parent company, DynaResource, Inc. (“DynaUSA”). Under the agreement, the Company had the right to earn up to a 50% equity interest in DynaMexico by funding up to $18 million in exploration and development expenditures on the San Jose de Gracia property. On March 14, 2011, the Company completed its Earn in/Option Agreement with DynaMexico for its 50% equity interest by reaching the expenditure funding requirement of $18 million. Subsequent to this date there have been legal claims filed in Mexico and the United States which resulted in the foreclosure of the Company’s share ownership.

​

On October 13, 2015, the Company was made aware of a news release disseminated by DynaMexico which claimed that DynaMexico was awarded a $48 million judgement against the Company’s subsidiary Goldgroup Resources Inc. The Company’s position in response to the $48 million claim is that the Company was never notified of the purported court case and does not recognize any of the claims mentioned therein and is of the belief that such claims are entirely without merit. The Company pursued the case to the Mexican Supreme Court level to get the judgment overturned.

​

On December 6, 2019, the 11th Federal Circuit Collegiate Court in México denied Goldgroup’s amparo regarding the $48 million claim and on February 20, 2020, a Mexico City court issued a judgment in favour of DynaMexico.

​

On December 4, 2020, DynaMexico filed another claim seeking recognition of the judgment under the Texas Uniform Foreign-County Money Judgment Recognition Act. The Company filed a Special Appearance, Motion to Dismiss for Improper Venue, and Motion for Non-Recognition in response. A hearing was held on the Special Appearance and Motion to Dismiss for Improper Venue on February 8, 2021 and on May 12, 2021, the 134th Judicial District Court, as a District Court of the State of Texas, ruled that it is not required to recognize DynaMexico’s foreign judgment from the country of Mexico. DynaUSA appealed this decision and the appeal was fully briefed and oral arguments were held on April 20, 2022. On May 2, 2023, the court of appeals dismissed DynaUSA’s appeal.  

​

On March 6, 2023, the Company announced that its subsidiary, Goldgroup Resources, filed a Request for Arbitration on February 17, 2023 with the ICSID against the United Mexican States. The treatment and inaction by the Mexican courts have resulted in a judicial expropriation of Goldgroup Resources’ investment in DynaMexico and a denial of justice in breach of Mexico’s obligations under the NAFTA. On February 7, 2024, Goldgroup Resources filed its Memorial on the Merits related to the NAFTA claim and received Mexico’s Counter Memorial on the Merits and Memorial on Jurisdiction on June 19, 2024. On December 12, 2024, Goldgroup Resources filed its Reply on the Merits and Counter Memorial on Jurisdiction and received Mexico’s Rejoinder on the Merits and Reply on Jurisdiction on April 28, 2025. On June 11, 2025, Goldgroup Resources filed its Rejoinder on Jurisdiction. On August 15, 2025, Goldgroup Resources and Mexico filed their respective Comments on the Non-Disputing Party Submissions filed by Canada and the United States of America pursuant to NAFTA Article 1128. On September 23, 2025, Goldgroup Resources’ damages experts filed a Supplemental Report on Quantum, and Goldgroup Resources received the Supplemental Report on Quantum of Mexico’s damages experts on November 18, 2025. Goldgroup Resources is seeking monetary damages as a result of Mexico’s breaches of NAFTA, as well as declarations from the arbitral tribunal to counter any potentially detrimental consequences stemming from the continued existence of the $48 million judgment issued by the Mexican courts in favour of DynaMexico. The NAFTA hearing concluded on June 3, 2026, and the Company is awaiting a ruling from the tribunal.

PINOS DISPOSITION

On February 27, 2026, the Company closed the sale of its 100% interest in Apolo, which holds the fully permitted Pinos Project. The decision to divest the Pinos Project followed management’s determination that, with the acquisition of the San Francisco mine and the Merger with GRC, the Pinos Project was non-core to the Company’s strategy.

​

Pursuant to the Share Purchase Agreement dated December 31, 2025 with a private arm’s length British Columbia company (the “Purchaser”), the Company sold all of the issued and outstanding shares of Apolo for total consideration of $5.0 million, consisting of:

​

Third Quarter – September 30, 2026‌Page 15

​


Nine months ended – September 30, 2026‌

​

●A cash deposit of $2.45 million payable on signing (of which $2.445 million was received as at December 31, 2025);
●$0.55 million due upon closing (received); and
●$2.0 million secured by a promissory note, payable on or before August 27, 2026 (outstanding).

​

In addition, the Purchaser assumed all liabilities associated with the Company’s original acquisition of Apolo, including the $0.4 million remaining payable under the original purchase agreement and $1.5 million payable to the previous owners of the Pinos Project triggered by the sale. As the final payment is past due and has not been received, the Company has provided for the $2.0 million on the statement of income and comprehensive income for the nine months ended September 30, 2026.

​

LIQUIDITY AND CAPITAL RESOURCES

A summary of the Company’s cash position and changes in cash and cash equivalents for:

​

​

​

​

For the nine months ended
September 30,

(tabled amounts are expressed in thousands of U.S. dollars)

  ​ ​ ​

​

2026

  ​ ​ ​

​

2025

Cash provided by (used in) operating activities

​

$

12,871

​

$

(11,879)

Cash provided by (used in) investing activities

​

​

26,959

​

​

(7,612)

Cash provided by (used in) financing activities

​

​

118,985

​

​

32,571

Increase (decrease) in cash

​

​

158,777

​

​

13,080

Cash, end of period

​

$

168,388

​

$

13,446

​

Cash provided by operating activities was $12.9 million in the current period, compared to cash used of $11.9 million in the comparative period. The improvement reflects:

●operating cash flow from the Don David Gold Mine from July 17, 2026;
●higher gold sales at Cerro Prieto, including the sale of inventory built up at the end of 2025.

These were partially offset by higher corporate costs, including costs associated with the Merger, and an increase in accounts receivable.

Cash provided by investing activities was $27.0 million, compared to cash used of $7.6 million in the comparative period. Investing activities in the current period included:

●$42.6 million of cash acquired on the Merger with Gold Resource;
●$11.4 million of property, plant and equipment purchases, primarily related to the refurbishment of the San Francisco Project, Cerro Prieto and sustaining capital at Don David;
●$4.8 million of capitalized exploration;
●$0.55 million of cash received on closing of the sale of the Pinos Project.

Cash provided by financing activities increased to $119.0 million from $32.6 million in the comparative period. This primarily reflects the September 25, 2026 private placement, which raised gross proceeds of $121.8 million, less share issue costs of $4.3 million and $0.66 million of tax paid on the net settlement of restricted share units. It also includes $2.1 million of proceeds from the exercise of warrants and stock options. The comparative period included proceeds from several private placements completed during 2025.

As at September 30, 2026, the Company had working capital of $14.9 million (current assets of $202.9 million less current liabilities of $188.0 million). This compares to a working capital deficiency of $40.3 million as at December 31, 2025.

​

Third Quarter – September 30, 2026‌Page 16

​


Nine months ended – September 30, 2026‌

​

Current liabilities include two significant items:

●Warrant liability ($19.0 million). This is a non-cash obligation that will be settled through the issuance of common shares on exercise or extinguished without a cash outlay on expiry. Excluding it, working capital would be $33.9 million.
●Gold and silver stream liability ($108.9 million). This was assumed on the Merger and relates to the Back Forty Project. It is classified as current because the Back Forty Project did not obtain all material permits by the August 31, 2026 milestone date under the amended gold stream agreement. The grace period runs to November 30, 2026, and if the permitting milestone is not met and the Stream Agreements are not amended by that date, the amounts advanced, together with accumulated interest, could become repayable on demand.

As disclosed in Note 1 to the condensed interim consolidated financial statements, notwithstanding the completion of the Merger, the Company has a history of recurring operating losses and an accumulated deficit of $237.0 million as at September 30, 2026. As a result, the Company’s ability to fund the combined group’s operations, service its obligations as they come due, and advance its planned work programs remains dependent on its ability to generate future profitable operations and/or obtain the necessary financing. These matters result in material uncertainties that may cast significant doubt on the Company’s ability to continue as a going concern. See “Going Concern” above.

Management’s plans to address the Company’s liquidity position include:

●generating operating cash flow from the Don David Gold Mine and the Cerro Prieto Gold Mine;
●cash on hand of $168.4 million at September 30, 2026, or approximately $97.5 million after the October 14, 2026 investment in Luca Mining Corp.;
●proceeds from the exercise of outstanding warrants and stock options, including approximately C$9.0 million received subsequent to September 30, 2026, and additional equity or debt financing as required; and
●ongoing planning, budgeting and forecasting to align capital spending with available liquidity.

There is no assurance that management’s plans will be successful, or that additional financing will be available on acceptable terms, or at all.

Capital Resources

The Company’s capital resources consist primarily of cash on hand and cash flow generated from mining operations. As at September 30, 2026, the Company had cash of $168.4 million, compared to $9.6 million as at December 31, 2025. Subsequent to September 30, 2026, the Company invested C$101.1 million (approximately US$70.9 million at the Bank of Canada exchange rate on October 14, 2026) in subscription receipts of Luca Mining Corp., funded from the proceeds of the September 2026 private placement, leaving cash of approximately $97.5 million on a pro forma basis.

Anticipated capital expenditures: Over the next twelve months, the Company expects to incur capital expenditures related to:

●refurbishment of the San Francisco Project ahead of the planned March 2027 restart, together with continued drilling;
●sustaining capital and underground development at the Don David Gold Mine, including Alta Gracia;
●sustaining capital and near-mine exploration at Cerro Prieto; and
●advancement of the definitive feasibility study and permitting at the Back Forty Project, subject to resolution of matters relating to the Stream Agreements.

Known commitments: As at September 30, 2026, the Company’s known commitments included:

●the gold and silver stream liability of $108.9 million;
●royalty payable on the San Francisco Project of $5.6 million ($2.2 million current and $3.4 million long-term);
●mining royalty taxes payable at Don David of $5.6 million;
●decommissioning obligations of $17.1 million;
●contingent consideration related to the Back Forty Project of $2.6 million;
●equipment purchase commitments at Don David of $3.9 million;
●payments under the San Francisco Project plan of arrangement, comprising $2.6 million payable to the remaining creditors in three equal instalments in December 2026, 2027 and 2028, approximately $8.0 million

Third Quarter – September 30, 2026‌Page 17

​


Nine months ended – September 30, 2026‌

​

of outstanding mining concession fees, taxes and other amounts, and $1.4 million remaining payable on the debt purchase; and
●contingent share consideration related to the Caballo Blanco project of $3.3 million.

Contingencies: Gold Resource’s Mexican subsidiary is disputing a tax assessment of MXN 331 million (approximately $18.6 million) in respect of its 2015 tax year, for which no provision has been recognized. See “Critical Accounting Judgments and Estimates”.

Sufficiency of capital resources: Management expects that cash on hand, after the investment in Luca Mining Corp., and operating cash flow from its producing mines will be sufficient to meet its normal operating requirements and planned capital and exploration activities over the next twelve months; however, this is subject to the material uncertainties described under “Going Concern”. If the permitting milestone is not met and the Stream Agreements are not  amended, OR Royalties may enforce its security over the Back Forty assets, which could result in the loss of the Back Forty Project.

​

ANALYSIS OF FINANCINGS

​

During the nine months ended September 30, 2026, the Company completed a non-brokered private placement on September 25, 2026 for gross proceeds of approximately US$121.8 million.

The following table sets out prior disclosure by the Company of its intended use of proceeds, other than working capital related costs, from the foregoing financings, the Company’s actual achievements and an explanation of any variation.

​

Disclosed Use of Proceeds

Company Achievements

Reasons for Variation

January 21, 2025

​

The Company intends to use the net proceeds raised from the private placement to fund advancement of the Company’s Cerro Prieto project, for general working capital purposes and debt reduction.

​

​

The Company has made capital expenditures to further improve mining operations at Cerro Prieto and has reduced overall debt of the Company.

​

​

​

N/A

March 17, 2025

​

The Company intends to use the net proceeds raised from the private placement for Cerro Prieto mine improvements, Pinos Project preliminary economic assessment update, debt reduction and general working capital.

​

​

The Company has made capital expenditures to further improve mining operations at Cerro Prieto and has reduced overall debt of the Company. No expenditures have been made on the Pinos Project.

​

​

​

No expenditures were made on the Pinos Project based on the analysis of strategic alternatives post-acquisition, the Company determined the best path forward was to divest the Pinos Project and entered into a sales agreement on December 31, 2025 which closed subsequent to year end.  

​

March 28, 2025

​

The Company intends to use the net proceeds raised from the private placement for Cerro Prieto mine improvements, a Pinos Project preliminary economic assessment update, debt reduction and general working capital.

​

​

The Company has made capital expenditures to further improve mining operations at Cerro Prieto and has reduced overall debt of the Company. No expenditures have been made on the Pinos Project.

​

​

​

No expenditures were made on the Pinos Project based on the analysis of strategic alternatives post-acquisition, the Company determined the best path forward was to divest the Pinos Project and entered into a sales agreement on December 31, 2025 which closed subsequent to year end.  

​

Third Quarter – September 30, 2026‌Page 18

​


Nine months ended – September 30, 2026‌

​

Disclosed Use of Proceeds

Company Achievements

Reasons for Variation

May 7, 2025

​

The Company intends to use the net proceeds raised from the private placement for near mine exploration at the Cerro Prieto Project, mine capital equipment and production improvements, a Pinos Project PEA update, debt reduction, ongoing assessment of acquisition opportunities and general corporate working capital purposes.

​

​

​

The Company has made capital expenditures to further improve mining operations at Cerro Prieto, has reduced overall debt of the Company and has started exploration activities at Cerro Prieto. No expenditures have been made on the Pinos Project.

​

​

​

No expenditures were made on the Pinos Project based on the analysis of strategic alternatives post-acquisition, the Company determined the best path forward was to divest the Pinos Project and entered into a sales agreement on December 31, 2025 which closed subsequent to year end.  

​

August 5, 2025

​

The net proceeds from this private placement will be primarily dedicated to the diligent assessment and strategic pursuit of acquisition opportunities. With a focus on enhancing shareholder value, the Company aims to leverage these funds to acquire promising mining assets, potentially including operating mines or strategic stakes in other mining companies.

​

​

On July 17, 2026, the Company completed the Merger with GRC, resulting in GRC becoming a wholly owned subsidiary of the Company. A portion of the proceeds from the private placement was used to fund legal, advisory and other transaction-related costs associated with the Merger.

​

​

A portion of the proceeds was used to fund expenditures at the San Francisco Project, including drilling and care and maintenance activities, as well as legal, advisory and other transaction-related costs associated with the Company’s Merger with GRC, which closed on July 17, 2026. The remaining proceeds continue to be available for the Company’s previously disclosed corporate and strategic purposes.

​

September 12, 2025

​

The net proceeds from this private placement will be primarily dedicated to the diligent assessment and strategic pursuit of acquisition opportunities. With a focus on enhancing shareholder value, the Company aims to leverage these funds to acquire promising mining assets, potentially including operating mines or strategic stakes in other mining companies.

​

​

The Company acquired the Molimentales interests through the Concurso Mercantil (bankruptcy) process and has subsequently incurred significant expenditures at the San Francisco Project, including drilling activities and care and maintenance costs. In addition, on July 17, 2026, the Company completed the Merger with GRC, resulting in GRC becoming a wholly owned subsidiary of the Company.

​

​

​

A portion of the proceeds was used to fund expenditures at the San Francisco Project, including drilling and care and maintenance activities, as well as legal, advisory and other transaction-related costs associated with the Company’s Merger with GRC, which closed on July 17, 2026. The remaining proceeds continue to be available for the Company’s previously disclosed corporate and strategic purposes.

September 25, 2026

​

The Company intends to use the net proceeds for working capital and general corporate purposes, including advancing its existing mining and development portfolio and evaluating strategic investments and M&A opportunities in the mining sector. 

​

Subsequent to September 30, 2026, the Company used proceeds from the private placement to fund its strategic investment in Luca Mining Corp. On October 14, 2026, the Company acquired 101,123,662 subscription receipts of Luca Mining Corp. for C$101.1 million in connection with Luca’s proposed acquisition of the Cozamin Mine.

​

​

None. The use of proceeds to fund the strategic investment in Luca Mining Corp. was consistent with the disclosed use of proceeds.

​

​

Third Quarter – September 30, 2026‌Page 19

​


Nine months ended – September 30, 2026‌

​

SHAREHOLDER’S EQUITY

The Company’s authorized capital stock consists of an unlimited number of common shares without par value. As at September 30, 2026, the Company had 168,997,124 common shares, 1,928,316 stock options, 29,607,582 warrants and 678,721 rights outstanding.  As at the date of this MD&A, the Company had 171,986,799 common shares, 1,928,316 stock options, 26,614,764 warrants and 678,721 rights outstanding.  

On July 10, 2026, the Company completed a share consolidation on the basis of one (1) post-consolidation common share for every four (4) pre-consolidation common shares. All share, per share, stock option, and warrant information has been retrospectively restated in this MD&A to reflect this share consolidation.

On July 17, 2026, the Company and GRC closed the Merger pursuant to the Arrangement Agreement. As a result of the Merger, GRC shareholders received 0.3619 common shares of Goldgroup for each share of GRC’s common stock held. In accordance with the terms of the Arrangement Agreement, Goldgroup and GRC jointly determined the ratio of the share consolidation to be one (1) post-consolidation Goldgroup share for every four (4) pre-consolidation Goldgroup shares. In connection with the completion of the Merger, the Company issued 59,132,077 common shares and assumed 275,191 stock options, 458,861 deferred share units, 685,961 restricted share units and 172,584 performance share units.

On September 25, 2026, the Company completed a non-brokered private placement of 33,382,326 units at US$3.65 per unit for gross proceeds of approximately US$121.8 million. Each unit consisted of one common share and one-half of one warrant, with each whole warrant exercisable at a price of US$5.10 per share until March 25, 2028. The proceeds are intended to support working capital, advancement of the Company's mining and development projects, and potential strategic investments and acquisitions.

During the period ended September 30, 2026, the Company issued 2,222,110 common shares as a result of warrant exercises for gross proceeds of approximately $1,968,000.

During the period ended September 30, 2026, the Company issued 856,250 common shares as a result of option exercises for gross proceeds of approximately $159,000.

Subsequent to September 30, 2026, the Company issued 2,989,675 common shares as a result of warrant exercises for gross proceeds of approximately $6,353,000.

On November 7, 2026, 3,143 warrants expired unexercised.

During the period ended September 30, 2026, the Company granted 937,500 options to directors of the Company. The options are exercisable at a price of C$6.20 per Goldgroup share. The options vest immediately and expire one (1) year from the date of grant.

During the period ended September 30, 2026, the Company issued 276,412 common shares to net settle 593,540 RSUs outstanding and cash settled 40,379 DSUs.

During the period ended September 30, 2026, the Company cancelled 4,766 outstanding rights to former employees.

During the period ended September 30, 2026, and in connection with completion of the Merger, the Company converted 172,584 performance share units assumed from GRC to restricted share units.

On July 2, 2026, the Company’s shareholders approved an omnibus equity incentive plan, being a “rolling up to 10% and fixed up to 10%” plan as defined in TSXV Policy 4.4. Under the plan, the number of common shares issuable on the exercise of options may not exceed 10% of the issued and outstanding common shares at the date of grant, and the number of common shares issuable under all other awards, including RSUs, DSUs and PSUs, may not exceed 30,152,991.

Third Quarter – September 30, 2026‌Page 20

​


Nine months ended – September 30, 2026‌

​

The table below provides a summary of the warrants outstanding as at the date of this MD&A:

​

​

Expiry date

Number of warrants

Exercise price

January 21, 2027

1,508,591

CAD $0.60

March 17, 2027

3,029,167

CAD $1.80

March 27, 2027

288,750

CAD $1.80

August 5, 2027

3,951,955

CAD $4.40

September 12, 2027

1,145,142

CAD $4.20

March 25, 2028

16,691,159

USD $5.10

​

26,614,764

​

​

The table below provides a summary of the stock options outstanding as at the date of this MD&A:

​

​

Expiry date

Number of stock options

Number of stock options (vested)

Exercise price $

October 31, 2028

715,625

715,625

CAD 0.16

July 3, 2027

937,500

937,500

CAD 6.20

February 25, 2031

36,190

36,190

USD 7.66

March 21, 2032

58,051

58,051

USD 6.66

January 4, 2031

180,950

180,950

USD 9.15

​

1,928,316

1,928,316

​

​

The table below provides a summary of the rights outstanding as at the date of this MD&A:

​

​

Expiry date

Number of rights

Deferred Share Units (DSUs)

418,482

Restricted Share Units (RSUs)

260,239

​

678,721

​

REGULATORY DISCLOSURES

​

Off-balance sheet arrangements

​

The Company does not have any off-balance sheet arrangements.

​

Proposed Transactions

​

The Company does not have any proposed transactions as at the date of this MD&A, other than as disclosed elsewhere in this MD&A.

​

​

​

​

Third Quarter – September 30, 2026‌Page 21

​


Nine months ended – September 30, 2026‌

​

Financial instruments

​

Fair value measurements

The accounting classification of each category of financial instruments, and the level within the fair value hierarchy in which they have been classified are set out below:

​

(tabled amounts are expressed in
thousands of U.S dollars)

  ​ ​ ​

Fair Value Hierarchy
Level

​

September 30,
2026

​

December 31,
2025

Financial assets

​

​

  ​ ​

​

​

  ​ ​

​

​

Amortized cost

​

​

​

​

​

​

​

​

Cash (1)

​

N/A

​

$

168,388

​

$

9,611

Receivables (1)

​

N/A

​

​

85

​

​

451

Assets held for sale

​

N/A

​

​

-

​

​

35

Trade receivables – provisionally priced (FVTPL) (2)

​

Level 2

​

​

6,593

​

​

-

​

​

​

​

​

​

​

​

​

Financial liabilities

​

​

​

​

​

​

​

​

Other financial liabilities

​

​

​

​

​

​

​

​

Accounts payable & accrued liabilities (1)

​

N/A

​

​

52,358

​

​

25,212

Liabilities held for sale

​

N/A

​

​

-

​

​

422

Royalty payable

​

Level 3

​

​

5,557

​

​

4,284

Mining taxes payable

​

N/A

​

​

5,640

​

​

-

Gold and silver stream liability (FVTPL) (3)

​

Level 2

​

​

108,900

​

​

-

Contingent consideration (FVTPL) (4)

​

Level 3

​

​

2,597

​

​

-

Warrant liability (FVTPL) (5)

​

Level 3

​

​

18,971

​

​

45,992

​

(1)The carrying value of cash, receivables and accounts payable and accrued liabilities approximates fair value due to the short-term nature of these items.  
(2)As a result of the acquisition of Gold Resource, the Company’s financial instruments include provisionally priced trade receivables measured at fair value through profit or loss. Provisionally priced trade receivables are classified within Level 2. 
(3)As a result of the acquisition of Gold Resource, the Company’s financial instruments also include gold and silver stream liabilities measured at fair value through profit or loss. The Back Forty Project did not obtain all material permits by the August 31, 2026 milestone date under the gold stream agreement. The grace period runs to November 30, 2026, and if the permitting milestone is not met and the Stream Agreements are not amended, the deposits plus accumulated interest could become repayable on demand. Because of this, fair value is measured by applying the contractual 12% interest to the deposits received, thus expected to be classified within Level 2 of the fair value hierarchy.
(4)As a result of the acquisition of Gold Resource, the Company’s financial instruments also include contingent consideration measured at fair value through profit or loss. The contingent consideration is expected to be classified within Level 3 of the fair value hierarchy.
(5)The Company applies a standard Black-Scholes model to value the warrant liability. 

Credit Risk

Credit risk is the risk of an unexpected loss if a customer or third party to a financial instrument fails to meet its contractual obligations. The Company’s financial instruments that are exposed to credit risk consist primarily of cash and trade receivables. The Company’s cash is held with major financial institutions in Canada, the United States and Mexico. As at September 30, 2026, trade receivables of $6.6 million relate to provisionally priced sales of concentrates from the Don David Gold Mine to a limited number of customers, with final settlement expected within three months. During the period, the Company recognized an impairment of $2.0 million on the promissory note receivable from the sale of the Pinos Project, which was not settled on its due date. The Company manages credit risk by dealing with reputable financial institutions and customers.

​

Third Quarter – September 30, 2026‌Page 22

​


Nine months ended – September 30, 2026‌

​

Liquidity Risk

Liquidity risk is the risk that the Company will not be able to meet its financial obligations as they fall due. The Company manages liquidity risk through the management of its capital structure, as described under “Capital Management”, and through its planning, budgeting and forecasting process. Accounts payable and accrued liabilities and the current portion of the royalty payable are due within the next twelve months. The gold and silver stream liability of $108.9 million is classified as current because the amounts advanced under the Stream Agreements, together with accumulated interest, could become repayable on demand if the permitting milestone is not met and the Stream Agreements are not amended by the end of the grace period on November 30, 2026. The warrant liability of $19.0 million will be settled through the issuance of common shares, or extinguished on expiry, and does not require a cash outlay. The Company is exposed to liquidity risk. See “Going Concern” and “Liquidity and Capital Resources”.

Market Risk

Market risk is the risk that the fair value of, or future cash flows from, a financial instrument will fluctuate because of changes in market prices. As at September 30, 2026, the Company did not hold any investments in publicly traded securities. Subsequent to September 30, 2026, the Company acquired subscription receipts of Luca Mining Corp. for C$101.1 million. The value of this investment will be exposed to fluctuations in the market price of Luca’s common shares once the subscription receipts are converted.

Price Risk

Price risk is the risk that the trading price of the Company’s shares will fluctuate and result in an increase or decrease in value of the warrant liability.

Commodity Price Risk

The Company is exposed to commodity price risk given that its revenues are derived from the sale of metals, the price of which have been historically volatile.

Interest Rate Risk

Interest rate risk is the risk that the fair value of, or future cash flows from, a financial instrument will fluctuate because of changes in market interest rates. The Company’s cash is held in deposit accounts and short-term instruments, and a 1% change in market interest rates would not have a significant impact on interest income. The gold and silver stream liability is measured by applying the contractual 12% interest rate to the deposits received and the Company has no variable-rate debt. As a result, the Company’s exposure to interest rate risk is not significant.

Foreign Exchange Risk

The Company operates in Canada, the United States and Mexico and is exposed to foreign exchange risk arising from transactions denominated in currencies other than the U.S. dollar, principally the Canadian dollar and the Mexican peso.

●U.S. dollars: the Company’s revenue and the majority of its financial liabilities, including the gold and silver stream liability.
●Mexican pesos: a significant portion of operating costs at the Don David and Cerro Prieto mines, as well as Mexican income and mining taxes.
●Canadian dollars: corporate costs and the warrant liability.

​

The operating results and financial position of the Company are reported in U.S. dollars, and fluctuations of these currencies against the U.S. dollar will affect the Company’s reported results and the value of its assets and liabilities. The Company’s exposure to the Mexican peso increased following the Merger with Gold Resource. Subsequent to September 30, 2026, the Company’s exposure to the Canadian dollar increased as a result of its C$101.1 million investment in Luca Mining Corp. The Company does not currently use derivative instruments to hedge its foreign exchange exposure.

​

Related party transactions

​

The Company’s related parties include its subsidiaries, associates over which it exercises significant influence, and key management personnel. Key management personnel are those persons having the authority and responsibility for planning, directing and controlling the activities of the Company, directly or indirectly. Key management personnel

Third Quarter – September 30, 2026‌Page 23

​


Nine months ended – September 30, 2026‌

​

include officers, directors or companies with common directors of the Company.  The remuneration of the Company’s directors and other key management personnel during the nine months ended September 30, 2026 and 2025, is as follows:

(tabled amounts are expressed in thousands of U.S dollars)

  ​ ​ ​

2026

2025

Short-term employee benefits included in salary and consulting

​

$

439

​

$

180

Director’s fees included in professional fees

​

​

774

​

​

79

Share-based compensation

​

​

4,164

​

​

6

Severance payments

​

​

2,558

​

​

-

Consulting fees included in salary and consulting

​

​

72

​

​

-

​

​

$

8,007

​

$

265

​

Short-term employee benefits include salaries incurred within the last three months of the statement of financial position date and other annual employee benefits.

At September 30, 2026, accounts payable and accrued liabilities includes $126,000 (December 31, 2025 - $76,000) owing to a director and/or officer and/or companies controlled by the directors.

​

Capital management

The capital of the Company consists of items included in shareholders equity (deficiency). The Company’s objectives for capital management are to safeguard its ability to support the Company’s normal operating requirement on an ongoing basis, continue the development and exploration of its mineral properties and support any expansionary plans.

The Company manages its capital structure and makes adjustments in light of changes in its economic environment and the risk characteristics of the Company’s assets. To effectively manage the entity’s capital requirements, the Company has in place a planning, budgeting and forecasting process to help determine the funds required to ensure the Company has the appropriate liquidity to meet its operating and growth objectives. As at September 30, 2026, the Company expects its capital resources to be sufficient to meet its normal operating requirements and planned development and exploration of its mineral properties for the next twelve months, subject to the material uncertainties described under “Going Concern” (see “Liquidity and Capital Resources”). There are no externally imposed capital requirements to which the Company has not complied.

​

Critical accounting estimates

The preparation of financial statements in conformity with IFRS requires management to make estimates and assumptions that affect the amounts reported in the financial statements and accompanying notes. Actual results could differ from those estimates.

The Company’s management makes judgments in its process of applying the Company’s accounting policies in the preparation of its consolidated financial statements. In addition, the preparation of the financial data requires that the Company’s management make assumptions and estimates of the effects of uncertain future events on the carrying amounts of the Company’s assets and liabilities at the end of the reporting period and the reported amounts of revenues and expenses during the reporting period. Actual results may differ from those estimates as the estimation process is inherently uncertain. Estimates are reviewed on an ongoing basis based on historical experience and other factors that are considered to be relevant under the circumstances. Revisions to estimates and the resulting effects on the carrying amounts of the Company’s assets and liabilities are accounted for prospectively.

​

Significant judgments in applying accounting policies

The critical judgments that the Company’s management has made in the process of applying the Company’s accounting policies, apart from those involving estimations, that have the most significant effect on the amounts recognized in the Company’s consolidated financial statements are as follows:

a)Impairment of assets

The carrying value of property, plant and equipment, exploration and evaluation properties and the Company’s mineral properties is reviewed each reporting period to determine whether there is any indication of

​

Third Quarter – September 30, 2026‌Page 24

​


Nine months ended – September 30, 2026‌

​

impairment. If the carrying amount of an asset exceeds its recoverable amount, the asset is impaired and an impairment loss is recognized in profit or loss. The assessment of fair values, including those of the cash-generating units, require the use of estimates and assumptions for recoverable production, long-term commodity prices, discount rates, foreign exchange rates, future capital requirements and operating performance. Changes in any of the assumptions or estimates used in determining the fair value of assets could impact the impairment analysis.

​

b)Impairment indicators for exploration and evaluation assets

Management applies judgment in assessing whether facts and circumstances indicate that the carrying amount of exploration and evaluation assets may exceed their recoverable amount. In making this assessment, management considers, among other matters, the period for which the entity has the right to explore in the specific area, plans for further exploration and evaluation, the results of exploration work to date, whether substantive expenditure on further exploration is budgeted or planned, and whether data exists that suggest the carrying amount is unlikely to be recovered in full from successful development or by sale. The use of judgment is particularly important in the early stages of a project where limited information may be available.

​

c)Economic recoverability and probability of future economic benefits of exploration and development costs

Management has determined that exploratory drilling and evaluation costs incurred which have been capitalized are economically recoverable. Management uses several criteria in its assessments of economic recoverability and probability of future economic benefit, including geologic and metallurgic information, history of conversion of mineral deposits to proven and probable reserves, scoping and feasibility studies, accessible facilities, existing permits and life of mine plans.

​

d)Functional currency

The functional currency of the Company and each of its subsidiaries is the currency of the primary economic environment in which the entity operates. The Company has determined the functional currency of each entity is the US dollar. Determination of functional currency may involve certain judgments to determine the primary economic environment, and the Company reconsiders the functional currency of its entities if there is a change in events and conditions which determined the primary economic environment.

​

e)Business combination – identification of the acquirer

The Merger with Gold Resource was accounted for as a business combination under IFRS 3 using the acquisition method. Management applied judgment in determining that Gold Resource met the definition of a business and that Goldgroup was the accounting acquirer.

In reaching this conclusion, management considered the following factors in favour of Goldgroup:

●Goldgroup issued the equity consideration;
●Goldgroup’s shareholders hold approximately 60% of the voting rights in the combined entity; and
●Goldgroup appointed three of the five members of the board of directors following completion of the Merger.

These were weighed against the following factors in favour of Gold Resource:

●Gold Resource was larger by total assets and revenue; and
●Gold Resource’s former executives held the senior management positions at closing.

Management concluded that the control-based indicators were decisive and that the transaction was not a reverse acquisition. Had Gold Resource been identified as the accounting acquirer, the basis of presentation of the consolidated financial statements would have been significantly different.

​

​

​

​

​

​

Third Quarter – September 30, 2026‌Page 25

​


Nine months ended – September 30, 2026‌

​

f)Classification of the gold and silver stream liability

The gold and silver stream liability assumed on the Merger relates to the Stream Agreements on the Back Forty Project. Management applied judgment in determining that the stream arrangements represent a financial liability under IFRS 9 rather than deferred revenue. It is measured at fair value through profit or loss, with changes in fair value recognized in profit or loss.

Management also applied judgment in classifying the liability as current at September 30, 2026. The Back Forty Project did not obtain all material permits by the August 31, 2026 milestone date under the amended gold stream agreement. If the permitting milestone is not met and the Stream Agreements are not amended by the end of the grace period on November 30, 2026, the amounts advanced, together with accumulated interest, could become repayable on demand. The Company does not have an unconditional right to defer settlement for at least twelve months after the reporting date.

​

Key sources of estimation uncertainty

The areas which require management to make significant estimates and assumptions in determining carrying values include, but are not limited to:

a)Mineral resources estimation

The carrying value and recoverability of mineral properties requires management to make certain estimates, judgments and assumptions about each project. Management considers the economics of the project, including the latest mineral resources prices and the long-term forecasts, and the overall economic viability of the project. The determination of mineral resources also requires the use of estimates. The Company estimates its mineral resources based on information prepared and approved by Qualified Persons as defined under NI 43-101 (as defined below). There are numerous uncertainties inherent in estimating mineral resources and assumptions that are valid at the time of estimation and may change significantly when new information becomes available. Changes in the forecasted prices of commodities, exchange rates, production costs or recovery rates may change the economic status of resources and may result in changes to mineral resource estimates.

​

b)Depreciation and depletion

Plants and other facilities used directly in mining activities are depreciated using the units-of-production (“UOP”) method over a period not to exceed the estimated life of the ore body based on recoverable ounces to be mined from estimated mineral resources. Mobile and other equipment are depreciated, net of residual value, on a straight-line basis, over the useful life of the equipment to the extent that the useful life does not exceed the related estimated life of the mine based on estimated recoverable mineral resources.

The calculation of the UOP rate, and therefore the annual depreciation and depletion expense, could be materially affected by changes in the underlying estimates. Changes in estimates can be the result of actual future production differing from current forecasts of future production, expansion of mineral reserves through exploration activities, differences between estimated and actual costs of mining and differences in gold price used in the estimation of mineral reserves.

Significant judgment is involved in the determination of useful life and residual values for the computation of depreciation and depletion and no assurance can be given that actual useful lives and residual values will not differ significantly from current assumptions.

​

c)Decommissioning and restoration provision

The Company assesses its provision for reclamation and remediation on an annual basis or when new material information becomes available. Mining and exploration activities are subject to various laws and regulations governing the protection of the environment. In general, these laws and regulations are continually changing and the Company has made, and intends to make in the future, expenditures to comply with such laws and regulations. Accounting for reclamation and remediation obligations requires management to make estimates of the future costs the Company will incur to complete the reclamation and remediation work required to comply with existing laws and regulations at each mining operation and exploration and development property. Actual costs incurred may differ from those amounts estimated. Also, future changes to environmental laws and regulations could increase the extent of reclamation and remediation work required to be performed by the Company. Increases in future costs could materially impact the amounts charged to operations for reclamation and remediation. The provision represents management’s best estimate of the

Third Quarter – September 30, 2026‌Page 26

​


Nine months ended – September 30, 2026‌

​

present value of the future reclamation and remediation obligation. The actual future expenditures may differ from the amounts currently provided.

​

d)Contingencies

Due to the size, complexity and nature of the Company’s operations, various legal and tax matters are outstanding from time to time. In the event that management’s estimate of the future resolution of these matters changes, the Company will recognize the effects of the changes in its consolidated financial statements on the date such changes occur. In October 2023, Gold Resource’s Mexican subsidiary received notification from the Mexican Tax Administration Service (“SAT”) of a sanction of MXN 331 million (approximately $18.6 million at September 30, 2026) resulting from an audit of its 2015 tax year covering intercompany transactions, the special mining duty and the extraordinary mining duty. The subsidiary is disputing the assessment. Management considers it probable that the tax authorities will accept the tax treatments taken, and no provision has been recognized. A change in this assessment could have a material effect on the Company’s financial statements.

​

e)Deferred taxes

In assessing the probability of realizing income tax assets recognized, management makes estimates related to expectations of future taxable income, expected timing of reversals of existing temporary differences and the likelihood that tax positions taken will be sustained upon examination by applicable tax authorities. Estimates of future taxable income are based on forecasted cash flows from operations and the application of existing tax laws in each jurisdiction. Forecasted cash flows from operations are based on life of mine projections internally developed and reviewed by management. The likelihood that tax positions taken will be sustained upon examination by applicable tax authorities is assessed based on individual facts and circumstances of the relevant tax position evaluated in light of all available evidence. Where applicable tax laws and regulations are either unclear or subject to ongoing varying interpretations, it is reasonably possible that changes in these estimates can occur that materially affect the amounts of income tax assets recognized. At the end of each reporting period, the Company reassesses unrecognized income tax assets.

​

f)Derivative valuation

The fair value of the warrant liabilities is determined using the Black-Scholes option pricing model, which requires the use of estimates and assumptions, including share price volatility, expected life, risk-free interest rate and expected dividends. Changes in any of the assumptions or estimates used in the valuation could impact the fair value of the derivative warrant liabilities and the amounts recognized in profit or loss.

​

g)Valuation of inventory

Expenditures incurred, and depreciation and depletion of assets used in mining and processing activities are deferred and accumulated as the cost of ore in stockpiles, ore on leach pads, in-process and finished metal inventories. These deferred amounts are carried at the lower of average cost or net realizable value (“NRV”). Write-downs of ore in stockpiles, ore on leach pads, in-process and finished metal inventories resulting from NRV impairments are reported as a component of current period costs. The primary factors that influence the need to record write-downs include prevailing and long-term metal prices and prevailing costs for production inputs such as labour, fuel and energy, materials and supplies, as well as realized ore grades and actual production levels.

​

Costs are attributed to the leach pads based on current mining costs, including applicable depreciation and depletion relating to mining operations incurred up to the point of placing the ore on the pad. Costs are removed from the leach pad based on the average cost per recoverable ounce of gold on the leach pad as the gold is recovered. Estimates of recoverable gold on the leach pads are calculated from the quantities of ore placed on the pads, the grade of ore placed on the leach pads and an estimated percentage of recovery. Timing and ultimate recovery of gold contained on leach pads can vary significantly from the estimates. The quantities of recoverable gold placed on the leach pads are reconciled to the quantities of gold actually recovered (metallurgical balancing), by comparing the grades of ore placed on the leach pads to actual ounces recovered. The nature of the leaching process inherently limits the ability to precisely monitor inventory levels. As a result, the metallurgical balancing process is constantly monitored and the engineering estimates are refined

Third Quarter – September 30, 2026‌Page 27

​


Nine months ended – September 30, 2026‌

​

based on actual results over time. The ultimate recovery of gold from a pad will not be known until the leaching process is completed.

​

The allocation of costs to ore on leach pads and in-process inventories and the determination of NRV involve the use of estimates. There is a high degree of judgment in estimating future costs, future production levels, reserves estimates, gold and silver prices, and the ultimate estimated recovery for ore on leach pads. There can be no assurance that actual results will not differ significantly from estimates used in the determination of the carrying value of inventories.

​

h)Business combination – fair value of assets acquired and liabilities assumed

​

The identifiable assets acquired and liabilities assumed on the Merger were recognized at their acquisition-date fair values. The Company engaged independent valuation specialists to assist in determining the fair value of Gold Resource’s mineral interests and property, plant and equipment. These valuations require significant estimates and assumptions, including:

●future production profiles and mineral resources;
●long-term metal prices;
●operating and capital costs;
●foreign exchange rates; and
●discount rates.

The fair value adjustments resulted in the recognition of additional deferred tax liabilities, measured under IAS 12 using the enacted income tax and mining duty rates in Mexico and the United States. These include an $81.4 million gross-up of mineral interests reflecting the tax effect of the fair value adjustments.

Consideration transferred of $252.8 million was allocated to the identifiable net assets acquired, and no goodwill was recognized. The purchase price allocation is provisional and may be adjusted during the measurement period, which ends no later than July 17, 2027, as additional information about facts and circumstances that existed at the acquisition date is obtained. The Company has not finalized the valuation of mineral properties, plant and equipment, the stream liability, decommissioning and restoration provisions, inventories, contingent consideration, replacement share-based awards, leases and deferred income taxes, and changes to these estimates would affect their carrying amounts. They would also affect future depreciation and depletion, which in the current period included $25.5 million related to the fair value adjustments.

​

i)Measurement of the gold and silver stream liability

The gold and silver stream liability was measured at fair value at the acquisition date and is subsequently remeasured at fair value through profit or loss at each reporting date. Because the Back Forty Project did not obtain all material permits by the August 31, 2026 milestone date, fair value at September 30, 2026 was measured by applying the contractual 12% interest to the deposits received. Normally, fair value would be measured using estimates of the expected timing and amount of future gold and silver deliveries, future metal prices and an appropriate discount rate. Changes in the status of the permitting milestone or the terms of the Stream Agreements could result in a material change to the carrying amount of the liability.

​

New accounting standards and interpretations issued but not yet effective

Standards and interpretations issued but not yet effective up to the date of issuance of the financial statements are listed below. This listing of standards and interpretations issued are those that the Company reasonably expects to have an impact on disclosures, financial position or performance when applied at a future date. IFRS 18 Presentation and Disclosure in Financial Statements (effective for annual periods beginning on or after January 1, 2027). Management is currently assessing the implications of applying the new standard on the group’s consolidated financial statements.

​

Third Quarter – September 30, 2026‌Page 28

​


Nine months ended – September 30, 2026‌

​

OTHER MD&A REQUIREMENTS

​

Goldgroup’s business of exploring, developing and mining mineral resources involves a variety of operational, financial and regulatory risks that are typical in the natural resource industry. The Company attempts to mitigate these risks and minimize their effect on its financial performance, but there is no guarantee that the Company will be profitable in the future, and any investment in Goldgroup’s common shares should be considered speculative.

​

Additional information relating to the Company is available on SEDAR+ at www.sedarplus.ca and on the Company’s website at www.goldgroupmining.com.

​

The Board of Directors of Goldgroup has approved the disclosure contained in this MD&A. A copy of this MD&A will be provided to anyone who requests it from the Company.

​

Compliance with NI 43-101

​

As required by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”), Goldgroup has filed technical reports detailing the technical information related to its material mineral properties discussed herein. For the purposes of NI 43-101, the Company’s material mineral properties are the Don David Mine, Cerro Prieto, San Francisco and Back Forty projects. Unless otherwise indicated, Goldgroup has prepared the technical information in this MD&A (“Technical Information”) based on information contained in the technical reports, news releases and other public filings (collectively, the “Disclosure Documents”) available under the Company’s profile on SEDAR+. Each Disclosure Document was prepared by or under the supervision of a qualified person as defined in NI 43-101. For readers to fully understand the information in this MD&A, they should read the Disclosure Documents in their entirety, including all qualifications, assumptions and exclusions that relate to the information set out in this MD&A which qualifies the Technical Information. The Disclosure Documents are each intended to be read as a whole, and sections should not be read or relied upon out of context. The Technical Information is subject to the assumptions and qualifications contained in the Disclosure Documents.

​

Scientific and technical information relating to the Company’s projects has been approved by Christopher Richings, P.Eng. , who by reason of education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, fulfills the requirements of a Qualified Person as defined in NI 43-101. Mr. Richings is not  independent of the Company within the meaning of NI 43-101.

​

Management’s Report on Internal Control Over Financial Reporting

​

The Company’s management is responsible for establishing and maintaining internal controls over financial reporting (“ICFR”) to provide reasonable assurance in respect to the reliability of financial reporting and the preparation of the financial statements for external purposes in accordance with IFRS.

​

On July 17, 2026, the Company completed the Merger with Gold Resource. As a result, the Company’s ICFR now includes the processes, systems and controls of Gold Resource and its subsidiaries, including the Don David Gold Mine and the Back Forty Project, and the controls over the consolidation of the combined group. The Company’s board of directors and executive management were also reconstituted on closing of the Merger. Management is in the process of integrating the controls of Gold Resource with those of the Company. Other than the changes resulting from the Merger, there were no changes in the Company’s ICFR during the three months ended September 30, 2026 that have materially affected, or are reasonably likely to materially affect, its ICFR.

​

The Chief Executive Officer and Chief Financial Officer of the Company are responsible for establishing and maintaining appropriate information systems, procedures and controls to ensure that information used internally and disclosed externally is complete, reliable and timely. They are also responsible for establishing adequate internal controls over financial reporting to provide sufficient knowledge to support the representations made in this MD&A and the Company’s interim consolidated financial statements for the nine months ended September 30, 2026 (together the “Interim Filings”). In accordance with National Instrument 52-109 Certification of Disclosure in Issuers’ Annual and Interim Filings, the Company has filed certificates signed by the Chief Executive Officer and Chief Financial Officer of the Company certifying certain matters with respect to the design of disclosure controls and procedures and the design of internal control over financial reporting as of September 30, 2026.

Third Quarter – September 30, 2026‌Page 29

​


Nine months ended – September 30, 2026‌

​

Limitations of Controls and Procedures

​

The Company’s management, including the Chief Executive Officer and Chief Financial Officer, believe that any disclosure controls and procedures or internal controls over financial reporting, no matter how well conceived and operated, can provide only reasonable, not absolute, assurance that the objectives of the control system are met. Further, the design of a control system must reflect the fact that there are resource constraints, and the benefits of controls must be considered relative to their costs. Because of the inherent limitations in all control systems, they cannot provide absolute assurance that all control issues and instances of fraud, if any, within the Company have been prevented or detected. These inherent limitations include the realities that judgments in decision-making can be faulty, and that breakdowns can occur because of simple error or mistake. Additionally, controls can be circumvented by the individual acts of some persons, by collusion of two or more people, or by unauthorized override of the control. The design of any systems of controls also is based in part upon certain assumptions about the likelihood of future events, and there can be no assurance that any design will succeed in achieving its stated goals under all potential future conditions. Accordingly, because of the inherent limitations in a cost effective control system, misstatements due to error or fraud may occur and not be detected.

​

Non-IFRS Financial Measures

​

Average Realized Price per Ounce

​

Average realized price per ounce is a non-IFRS financial measure. For Cerro Prieto, the measure is calculated by dividing gold sales revenue by gold ounces sold. The measure is calculated on a consistent basis for the periods presented. Average realized price per ounce statistics are intended to provide additional information only, do not have any standardized meaning prescribed by IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measures are not necessarily indicative of operating profit or cash flow from operations as determined under IFRS. Other companies may calculate these measures differently.

​

The following table provides a reconciliation between non-IFRS average realized price per ounce to the most directly comparable IFRS measure for the three and nine months ended September 30, 2026:

​

​

​

​

​

Cerro Prieto

  ​

Three months
ended Sept. 30, 2026

  ​

Three months ended
Sept. 30, 2025

  ​

Nine months ended
Sept. 30, 2026

  ​

Nine months ended
Sept. 30, 2025

Revenue (in thousands
of U.S. dollars)

​

$

12,669

​

$

3,707

​

$

54,970

​

$

13,651

Less: silver revenue

​

​

(286)

​

​

(28)

​

​

(589)

​

​

(147)

Gold sales revenue

​

$

12,383

​

$

3,679

​

$

54,381

​

$

13,504

Ounces of gold sold

​

​

3,040

​

​

1,096

​

​

12,293

​

​

4,287

Average realized gold price ($/oz)

​

$

4,073

​

$

3,356

​

$

4,424

​

$

3,150

​

Risks and Uncertainties

​

Exploration, development and mining of metals involve numerous inherent risks. As such, the Company is subject to various financial, operational and political risks that could have a significant impact on its profitability and levels of operating cash flows. Such risk factors could materially affect the value of the Company’s assets and future operating results of the Company and could cause actual events to differ materially from those described in forward-looking statements relating to the Company.

​

An investment in the securities of the Company should be considered speculative due, generally, to the nature of the business in which the Company is engaged, the Company’s reliance on two producing mines, the stage of development of its other projects and the degree of its reliance upon the expertise of management.

​

Third Quarter – September 30, 2026‌Page 30

​


Nine months ended – September 30, 2026‌

​

The list of risk factors below should not be taken as exhaustive of the risks faced by the Company or by investors in the Company. The below factors, and others not specifically referred to below, may in the future materially affect the financial performance of the Company and the value of its securities.

Lack of Operational Profit

There is no guarantee that the Company’s operations will be profitable.

The Company has not paid any dividends and does not anticipate paying dividends in the immediate or foreseeable future. A prospective investor in the Company must be prepared to rely solely upon the ability, expertise, judgment, discretion, integrity and good faith of the Company’s management in all aspects of the development and implementation of the Company’s business activities.

Goldgroup’s expected operating costs and expenditures, economic returns and other projections from a mining project which are contained in this MD&A and in any technical reports or other studies prepared for or by Goldgroup are based on assumed or estimated future metals prices, cut-off grades, operating costs, capital costs, and expenditures and other factors that each may prove to be inaccurate. Therefore, such studies and reports may prove to be unreliable.

For example, significant declines in market prices for base and precious metals or extended periods of inflation would have an adverse effect on any economic projections. In addition, any material reductions in estimates of mineralization or increases in capital costs and expenditures, or in Goldgroup’s ability to maintain a projected budget or renew a particular mining permit, could also have a material adverse effect on projected production schedules and economic returns, as well as on Goldgroup’s overall results of operations or financial condition. There is also a risk that rising costs for labour and material could have an adverse impact on forecasted construction costs and that shortages of labour and material could have a negative impact on any mine development schedule.

Goldgroup’s operating costs are affected by the cost of commodities and goods such as steel, fuel, electrical power and supplies, including tires and reagents. Management of Goldgroup prepares its cost and production guidance and other forecasts based on its review of current and estimated future costs, and management assumes that the materials and supplies required for operations will be available for purchase. An increase in any of these costs, or a lack of availability of commodities and goods, may have an adverse impact on Goldgroup’s financial condition.

Market Price of the Common Shares

​

The Company’s shares are listed and posted for trading on the TSXV and the NYSE American. There can be no assurance that an active trading market in the Company’s securities will be maintained. Securities of companies involved in the resource industry have experienced substantial volatility in the past, often based on factors unrelated to the financial performance or prospects of the companies involved. The market price of the Company’s shares may also be significantly affected by short-term changes in commodity prices, general market conditions, or changes in the Company’s financial condition or results of operations.

​

Acquisition Strategy

As part of the Company’s business strategy, it has sought and will continue to seek new exploration, mining and development opportunities in the resource industry. In pursuit of such opportunities, the Company may fail to select appropriate acquisition candidates or negotiate acceptable arrangements, including arrangements to finance acquisitions or integrate the acquired businesses and their personnel into the Company. The Company cannot assure that it can complete any acquisition or business arrangement that it pursues, or is pursuing, on favourable terms, or that any acquisitions or business arrangements completed will ultimately benefit the Company.

The Company may not realize the benefits of its growth projects

As part of its strategy, the Company will continue existing efforts and initiate new efforts to develop new mineral projects. A number of risks and uncertainties are associated with the development of these types of projects, including political, regulatory, design, construction, labour, operating, technical, and technological risks, and uncertainties relating to capital and other costs, and financing risks. The failure to develop one or more of these initiatives successfully could have an adverse effect on the Company’s financial position and results of operations.

Third Quarter – September 30, 2026‌Page 31

​


Nine months ended – September 30, 2026‌

​

Current Global Financial Conditions

Events over the last number of years in global financial markets have had a profound impact on the global economy and global financial conditions have been subject to volatility. Many industries, including the mining sector, are impacted by these market conditions. Some of the key impacts of the current financial market turmoil include contraction in credit markets resulting in a widening of credit risk, devaluations and high volatility in global equity, commodity, foreign exchange and precious metal markets and a lack of market liquidity. A continuing slowdown in financial markets or other economic conditions, including, but not limited to, consumer spending, employment rates, business conditions, inflation, fuel and energy costs, consumer debt levels, lack of available credit, the state of the financial markets, interest rates, and tax rates may adversely affect the Company’s business, financial condition, results of operations and ability to grow.

​

Financing Risk

The Company has no assurance that additional funding will be available for further exploration and development of its projects or to fulfill its obligations under any applicable agreements. There can be no assurance that the Company will be able to obtain adequate financing in the future or that the terms of such financing will be favorable. Failure to obtain such additional financing could result in delay or indefinite postponement of further exploration and development of its projects with the possible loss of such properties.

​

Competition

The mineral exploration and development industry is highly competitive. The Company competes with other domestic and international mineral exploration companies that have greater financial, human and technical resources. The Company’s competitors may be able to respond more quickly to new laws or regulations or emerging technologies, or devote greater resources to the expansion or efficiency of their operations than the Company can. In addition, current and potential competitors may make strategic acquisitions or establish cooperative relationships among themselves or with third parties. Accordingly, it is possible that new competitors or alliances among current and new competitors may emerge and gain significant market share to the Company’s detriment. The Company may also encounter increasing competition from other mining companies in the Company’s efforts to hire experienced mining professionals. Increased competition could adversely affect the Company’s ability to attract necessary capital funding, to acquire it on acceptable terms, or to acquire suitable properties or prospects for mineral exploration in the future. As a result of this competition, the Company may not be able to compete successfully against current and future competitors, and any failure to do so could have a material adverse effect on the Company’s business, financial condition, results of operations and prospects.

Factors beyond the control of the Company may affect the marketability of any substances discovered. These factors include market fluctuations, the proximity and capacity of natural resource markets and processing equipment, government regulations, including regulations relating to prices, taxes, royalties, land tenure, land use, importing and exporting of minerals and environmental protection. The exact effect of these factors cannot be accurately predicted, but the combination of these factors may result in the Company not receiving an adequate return on invested capital or losing its investment capital.

Risks related to International Activities

The Company conducts business in Canada, the United States and Mexico, with a material portion of the business being conducted in Mexico. The Company’s international operations may be adversely affected by political or economic developments or social instability, which will not be within the Company’s control, including, among other things, the risks of political unrest, labour disputes and unrest, war, terrorism, abduction, expropriation, nationalization, renegotiation or nullification of existing concessions, contracts and permits, government regulation, delays in obtaining or renewing or the inability to obtain or renew necessary permits, taxation policies, economic sanctions, fluctuating exchange rates, currency controls, high rates of inflation, limitations on foreign ownership and increased financing costs. The occurrence of any such events could have a material adverse effect on the Company’s business and results of operations as currently contemplated.

It may also be difficult for the Company to find and hire qualified people in the mining industry who are situated in Mexico or to obtain all of the necessary services or expertise in Mexico or to conduct operations on the Company’s projects at reasonable rates. If qualified people and services or expertise cannot be obtained, the Company may need to

Third Quarter – September 30, 2026‌Page 32

​


Nine months ended – September 30, 2026‌

​

seek and obtain those services from people located outside of these areas, which will require work permits and compliance with applicable laws and could result in delays and higher costs to conduct the Company’s operations.

Corruption and Bribery Risk

The Company’s operations are governed by, and involve interactions with, many levels of government. Like most companies, the Company is required to comply with anti-corruption and anti-bribery laws, including the Canadian Corruption of Foreign Public Officials Act. In recent years, there has been a general increase in both the frequency of enforcement and severity of penalties under such laws, resulting in greater scrutiny and punishment to companies convicted of violating anti-bribery laws. Furthermore, a company may be found liable for violations by not only its employees, but also by its third party agents. Although the Company takes steps to mitigate such risks, such measures are not always effective in ensuring that the Company, its employees or third party agents will comply strictly with such laws. If the Company finds itself subject to an enforcement action or is found to be in violation of such laws, this may result in significant penalties, fines and/or sanctions imposed on the Company resulting in a material adverse effect on the Company’s reputation and results of operations.

Risks Associated with Joint Venture Agreements

Pursuant to agreements the Company may enter into in the course of its business, the Company’s interest in its properties may become subject to the risks normally associated with the conduct of joint ventures. In the event that any of the Company’s properties become subject to a joint venture, the existence or occurrence of one or more of the following circumstances and events could have a material adverse impact on the Company’s profitability or the viability of its interests held through joint ventures, which could have a material adverse impact on the Company’s business prospects, results of operations and financial condition: (i) disagreements with joint venture partners on how to conduct exploration; (ii) inability of joint venture partners to meet their obligations to the joint venture or third parties; and (iii) disputes or litigation between joint venture partners regarding budgets, development activities, reporting requirements and other joint venture matters.

Reliance on Key Individuals

The Company’s success depends on its ability to attract and retain the services of key personnel who are qualified and experienced. In particular, the success of the Company is, and will continue to be to a significant extent, dependent on the expertise and experience of the Company’s directors and senior management. It is expected that these individuals will be a significant factor in the Company’s growth and success. The loss of the service of these individuals could have a material adverse effect on the Company.  

The resource industry is largely driven by fluctuations in commodity prices which, when high, can lead to a large number of projects being developed which in turn increases the demand for skilled personnel, contractors, material and supplies. Accordingly, there is a risk to the Company of losing or being unable to secure enough suitable key personnel or key resources and, as a result, being exposed to increased capital and operating costs and delays, which may in turn adversely affect the development of the Company’s projects, the results of operations and the Company’s financial condition and prospectus.  

Commodity Prices

The price of the Company’s common shares and the Company’s financial results may be significantly adversely affected by a decline in the price of metals. The price of metal commodities fluctuates widely, especially in recent years, and is affected by numerous factors beyond the Company’s control such as the sale or purchase of commodities by various central banks and financial institutions, interest rates, exchange rates, inflation or deflation, fluctuation in the value of the United States dollar and foreign currencies, global and regional supply and demand, and the political and economic conditions of major metal-producing countries throughout the world.

The price of metals has fluctuated widely in recent years, and future serious price declines could cause continued development of and commercial production from the Company’s properties to be impracticable. Future cash flows may not be sufficient and the Company could be forced to discontinue production and may be forced to sell the properties. Future production by the Company is dependent on metal prices that are adequate to make this property economic.

Third Quarter – September 30, 2026‌Page 33

​


Nine months ended – September 30, 2026‌

​

In addition to adversely affecting the commercial production estimates and financial conditions, declining commodity prices can impact operations by requiring a reassessment of the feasibility of a particular project. Such a reassessment may be the result of a management decision or may be required under financing arrangements related to a particular project. Even if the project is ultimately determined to be economically viable, the need to conduct such a reassessment may cause substantial delays or may interrupt operations until the reassessment can be completed.

Dividend Policy

No dividends on the common shares have been paid by the Company to date. The Company anticipates that it will retain all earnings and other cash resources for the foreseeable future for the operation and development of its business. The Company does not intend to declare or pay any cash dividends in the foreseeable future. Payment of any future dividends will be at the discretion of the Company’s board of directors after taking into account many factors, including the Company’s operating results, financial condition and current and anticipated cash needs.

Conflicts of Interest

Certain of the directors and officers of the Company also serve as directors and/or officers of other companies involved in natural resource exploration, development and mining operations and consequently there exists the possibility for such directors and officers to be in a position of conflict. Any decision made by any of such directors and officers will be made in accordance with their duties and obligations to deal fairly and in good faith with a view to the best interests of the Company and its shareholders. In addition, each of the directors is required to declare and refrain from voting on any matter in which such directors may have a conflict of interest in accordance with the procedures set forth in the Business Corporations Act (British Columbia) and other applicable laws.

​

Exploration, Development and Operating Risks

​

Mining operations generally involve a high degree of risk. Any potential mining operations of the Company will be subject to all the hazards and risks normally encountered in the exploration, development and production of metals, including unusual and unexpected geologic formations, seismic activity, rock bursts, cave-ins, flooding, fire, environmental hazards and the discharge of toxic chemicals, explosions and other conditions involved in the drilling and removal of material, any of which could result in damage to, or destruction of mines and other producing facilities, damage to property, injury or loss of life, environmental damage, work stoppages, delays in production, increased production costs and possible legal liability. Milling operations are subject to hazards such as equipment failure or failure of retaining dams around tailings disposal areas which may result in environmental pollution and consequent liability. Although the Company believes that appropriate precautions to minimize risks are taken, these risks cannot be eliminated.

The exploration for and development of mineral deposits involves significant risks which even a combination of careful evaluation, experience and knowledge may not eliminate. While the discovery of an ore body may result in substantial rewards, few properties which are explored are ultimately developed into producing mines. Major expenses may be required to locate and establish mineral reserves, to develop metallurgical processes and to construct mining and processing facilities at a particular site. It is impossible to ensure that the exploration or development programs planned or other mining operations in which the Company may acquire an interest will result in a profitable commercial mining operation. Whether a mineral deposit will be commercially viable depends on a number of factors, including among other things: the interpretation of geological data obtained from drill holes and other sampling techniques, the particular attributes of the deposit, such as size, grade and proximity to infrastructure and labour; metal prices which are highly cyclical; government regulations, including regulations relating to prices, taxes, royalties, land tenure, land use, importing and exporting of minerals and environmental protection; and political stability. The Company’s development projects are also subject to the issuance of necessary permits and other governmental approvals and receipt of adequate financing. The exact effect of these factors cannot be accurately predicted, but the combination of these factors may adversely affect the Company’s business.

Costs

The estimates of costs to conduct further exploration and development work by the Company are based on certain assumptions with respect to the method and timing of the work. By their nature, these estimates and assumptions are subject to significant uncertainties and, accordingly, the actual costs may materially differ from these estimates and

Third Quarter – September 30, 2026‌Page 34

​


Nine months ended – September 30, 2026‌

​

assumptions. Accordingly, no assurance can be given that the cost estimates and the underlying assumptions will be realized in practice, which may materially and adversely affect the Company’s viability.

Environmental Regulation, Risks and Hazards

All phases of mining operations are subject to environmental regulation in the jurisdictions in which they operate. These regulations mandate, among other things, the maintenance of air and water quality standards and land reclamation. They also set forth limitations on the generation, transportation, storage and disposal of solid and hazardous waste. Environmental legislation is evolving in a manner which will require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and a heightened degree of responsibility for companies and their officers, directors and employees. Compliance with changing environmental laws and regulations may require significant capital outlays, including obtaining additional permits, and may cause material changes or delays in, or the cancellation of, the Company’s exploration programs or current operations. There is no assurance that future changes in environmental regulation, if any, will not adversely affect the Company’s mining operations.

Furthermore, environmental hazards may exist on the properties on which the owners or operators of mining operations hold interests which are unknown to such owners or operators at present and which have been caused by previous or existing owners or operators of the properties.

Government approvals and permits are currently, and may in the future be, required in connection with mining operations at the Company’s properties. To the extent such approvals are required and not obtained, mining operations may be curtailed or prohibited from continuing operations or from proceeding with planned exploration or development of mineral properties.

Failure to comply with applicable laws, regulations and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment or remedial actions. Parties engaged in mining operations or in the exploration or development of mineral properties may be required to compensate those suffering loss or damage by reason of the mining activities and may have civil or criminal fines or penalties imposed for violations of applicable laws or regulations. The occurrence of any environmental violation or enforcement action may have an adverse impact on the Company’s operations and reputation.

Amendments to current laws, regulations and permits governing operations and activities of mining and exploration companies, or more stringent implementation thereof, could have a material adverse impact on mining operations and cause increases in exploration expenses, capital expenditures or production costs or reduction in levels of production at producing properties or require abandonment or delays in development of new mining properties.

Governmental Regulation

Mining operations and exploration activities are subject to extensive laws and regulations governing exploration, development, production, exports, taxes, labour standards, waste disposal, protection and remediation of the environment, reclamation, historic and cultural resources preservation, mine safety and occupation health, handling, storage and transportation of hazardous substances and other matters. The costs of discovering, evaluating, planning, designing, developing, constructing, operating, and other facilities in compliance with such laws and regulations are significant. It is possible that the costs and delays associated with compliance with such laws and regulations could become such that the owners or operators of mining operations would not proceed with the development of or continue to operate a mine. As part of their normal course operating, and development activities, such owners or operators have expended significant resources, both financial and managerial, to comply with governmental and environmental regulations and permitting requirements, and will continue to do so in the future. Moreover, it is possible that future regulatory developments, such as increasingly strict environmental protection laws, regulations and enforcement policies thereunder, and claims for damages to property and persons resulting from mining operations could result in substantial costs and liabilities in the future.

Our operations are governed by, and involve interactions with, many levels of government in countries with a history of corruption. Like most companies, we are required to comply with anti-corruption and anti-bribery laws, including the Canadian Corruption of Foreign Public Officials Act, as well as similar laws in the countries in which we conduct

Third Quarter – September 30, 2026‌Page 35

​


Nine months ended – September 30, 2026‌

​

our business. In recent years, there has been a general increase in both the frequency of enforcement and severity of penalties under such laws, resulting in greater scrutiny and punishment to companies convicted of violating anti-bribery laws. Furthermore, a company may be found liable for violations by not only its employees, but also by its third party agents. It is our policy to implement safeguards to discourage these practices by employees and our consultants. However, our existing safeguards and any future improvements may prove to be less than effective, and our employees and consultants may have engaged or may engage in conduct for which we might be held responsible. Violations of such laws may result in criminal or civil sanctions, and we may be subject to other liabilities, which could negatively affect our business, operating results and financial condition.

Permitting

Mining operations are subject to receiving and maintaining permits from appropriate governmental authorities. It can be time-consuming and costly to obtain, maintain and renew permits. In addition, permit terms and conditions can impose restrictions on how the Company conducts its operations and limit the Company’s flexibility in development of its mineral properties. Prior to any development on the Company’s properties, permits from appropriate governmental authorities may be required. Permits required for the Company’s operations may not be issued, maintained or renewed in a timely fashion or at all, may not be issued or renewed upon conditions that restrict the Company’s ability to conduct the Company’s operations economically, or may be subsequently revoke. Any such failure to obtain, maintain or renew permits, or other permitting delays or conditions could have a material adverse effect on the Company’s business, results of operations, financial condition and prospectus.

Failure to comply with applicable laws, regulations and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment or remedial actions. Parties engaged in mining operations may be required to compensate those suffering loss or damage by reason of the mining activities and may be liable for civil or criminal fines or penalties imposed for violations of applicable laws or regulations.

Goldgroup is in the process of applying for or renewing permits and licences relating to its operations in Mexico, and will require permits to construct and operate the Back Forty Project in Michigan, United States. The Company cannot be certain that it will receive the necessary permits and licences at all, or on acceptable terms required to conduct further exploration and to develop its properties and bring them into production. Government approvals and approvals of members of the surrounding communities and permits and licences are currently, and will in the future be, required in connection with the operations of the Company. To the extent such approvals are required and not obtained, the Company may be curtailed or prohibited from continuing its exploration, development or production activities. The failure to obtain such permits or licences, or delays in obtaining such permits or licences, could increase the Company’s costs and delay its activities, and could adversely affect the properties, business or operations of the Company.

Infrastructure

Mining, processing, development and exploration activities depend, to one degree or another, on adequate infrastructure. Reliable roads, bridges, power sources and water supply are important determinants, which affect capital and operating costs. Unusual or infrequent weather phenomena, sabotage, government or other interference in the maintenance or provision of such infrastructure could adversely affect operations at the Company’s properties.

Exploration and Geological Report

The reported results in the technical reports filed in respect of the Company’s properties are estimates only. No assurance can be given that the estimated mineralization will be recovered. The reported results are based on limited sampling, and, consequently, are uncertain because the samples may not be representative. Estimates may require revision (either up or down) based on actual production experience. If the Company encounters mineralization or geological formations different from those predicted by past drilling, sampling and interpretations, any estimates may need to be altered in a way that could adversely affect the Company’s operations or proposed operations. In addition, market fluctuations in the price of metals, as well as increased production costs or reduced recovery rates, may render certain minerals uneconomic.

​

Third Quarter – September 30, 2026‌Page 36

​


Nine months ended – September 30, 2026‌

​

Land Title

No assurances can be given that there are no title defects affecting the Company’s properties. The Company’s properties may be subject to prior unregistered liens, agreements, transfers or claims, including native land claims, and title may be affected by, among other things, undetected defects.  

A mineral concession in Mexico does not confer any ownership of surface rights. The majority of Goldgroup’s mineral properties are located in relatively uninhabited areas. There are currently no areas of interest to Goldgroup within its mineral concession that are overlain by significant habitation or industrial users, however there are potential overlapping surface usage issues in some areas. Some surface rights may be owned by local communities or “Ejidos” or by private ranching or residential interests. Goldgroup will require additional surface rights to exploit all resources on its properties. Accordingly, Goldgroup will need to negotiate agreements with private landowners for access and any potential development or exploitation rights. There is no assurance that surface rights agreements that may be necessary for future operations will be obtained when needed, on reasonable terms or at all, which could materially and adversely affect the business of Goldgroup.

Additional Capital

Mining, processing, development and exploration may require substantial additional financing. Failure to obtain sufficient financing may result in delaying or indefinite postponement of exploration, development or production or even a loss of property interest. There can be no assurance that additional capital or other types of financing will be available if needed or that, if available, will be on satisfactory terms.

Foreign Exchange Rate Fluctuations

Operations in Mexico, the United States and Canada are subject to foreign currency exchange fluctuations. The Company has raised funds through equity issuances priced in both Canadian and U.S. dollars, including the September 2026 private placement, which was priced in U.S. dollars. The Company’s revenue is denominated in U.S. dollars, while a significant portion of its operating costs and taxes in Mexico are denominated in Mexican pesos and its corporate costs are largely denominated in Canadian dollars. The Company may suffer losses due to adverse foreign currency fluctuations.

Property Exploration and Development Risk

Some of the Company’s properties are currently at the exploration stage of development. Exploration and development are subject to numerous risks, including, but not limited to, delays in obtaining equipment, material and services essential to developing the project in a timely manner; changes in environmental or other government regulations; currency exchange rates; labour shortages; and fluctuation in metal prices. There can be no assurance that the Company will have the financial, technical and operational resources to complete the exploration and development in accordance with current expectations or at all.

Insurance Risk

​

The Company’s business is subject to a number of risks and hazards generally, including adverse environmental conditions, industrial accidents, labour disputes, unusual or unexpected geological conditions, ground or slope failure, cave-ins, mechanical failures, changes in the regulatory environment and natural phenomena such as inclement weather conditions, fires, floods and earthquakes. Such occurrences could result in damage, delays in mining, monetary losses and possible legal liability.

​

Although the Company maintains insurance to protect against certain risks in such amounts as it considers reasonable, the Company’s insurance will not cover all the potential risks associated with a mining company’s operations. The Company may also be unable to maintain insurance to cover these risks at economically feasible premiums. Insurance coverage may not continue to be available or may not be adequate to cover any resulting liability. Moreover, insurance against risks such as loss of title to mineral property, environmental pollution, or other hazards as a result of exploration and production is not generally available to the Company or other companies in the mining industry on acceptable terms. The Company may also become subject to liability for pollution or other hazards which may not be insured against or which the Company may elect not to insure against because of premium costs or other reasons. Losses from these events may cause the Company to incur significant costs that could have a material adverse effect on our financial performance and results of operations.

Third Quarter – September 30, 2026‌Page 37

​


Nine months ended – September 30, 2026‌

​

Force Majeure

​

The Company’s projects now or in future may be adversely affected by risks outside the control of the Company, including labour unrest, civil disorder, war, subversive activities or sabotage, fires, floods, explosions or other catastrophes, epidemics or quarantine restrictions.

​

Mining Without a Feasibility Study

​

Company has chosen to advance the Cerro Prieto project into production without the benefit of completing a feasibility study demonstrating economic and technical viability. An updated independent technical report on Cerro Prieto was filed on November 6, 2025; however, it does not constitute a feasibility study. Accordingly, readers should be cautioned that the Company’s production decision has been made without a comprehensive feasibility study of established reserves or resources such that there is greater risk and uncertainty as to future economic results from the Cerro Prieto Mine and a higher technical risk of failure than would be the case if a feasibility study were completed and relied upon to make a production decision.

​

Cautionary Statement on Forward-Looking Information

​

This MD&A contains “forward-looking information” (within the meaning of applicable Canadian securities law) and “forward-looking statements” (within the meaning of the United States Private Securities Litigation Reform Act of 1995) concerning Goldgroup’s plans at its mineral properties and other matters. These statements relate to analyses and other information that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management. Actual results could differ materially from the conclusions, forecasts and projections contained in such forward-looking information.

​

Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as “expects”, “is expected”, “anticipates”, “plans”, “projects”, “estimates”, “assumes”, “intends”, “strategy”, “goals”, “objectives”, “potential” or variations thereof or stating that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to materially differ from those reflected in the forward-looking statements, and are developed based on assumptions about such risks, uncertainties and other factors set out herein including, without limitation:

​

●uncertainties related to actual capital costs, operating costs, mine dilution and expenditures, production schedules and economic returns from Goldgroup’s projects;
●uncertainties associated with development activities;
●uncertainties inherent in the estimation of mineral resources, mineral reserves and precious metal recoveries;
●risks related to obtaining appropriate permits and licences to explore, develop, operate and produce

at the Company’s projects;

●uncertainties related to current global economic conditions;
●fluctuations in precious and base metal prices;
●uncertainties related to the availability of future financing;
●risks associated with the completion of technical and feasibility studies, including the planned feasibility study for Back Forty;
●the risks relating to potential default under the Stream Agreements;
●the outcome of the tax assessment issued by the Mexican tax authorities in respect of the 2015 tax year of Gold Resource’s Mexican subsidiary;
●potential difficulties with joint venture partners;
●risks that Goldgroup’s title to its property could be challenged;
●political and country risk;
●risks associated with Goldgroup being subject to government regulation;
●risks associated with having adequate surface rights for operations;
●environmental risks;
●Goldgroup’s need to attract and retain qualified personnel;

Third Quarter – September 30, 2026‌Page 38

​


Nine months ended – September 30, 2026‌

​

●risks associated with operating hazards at the Cerro Prieto Mine;
●risks associated with potential conflicts of interest;
●Goldgroup’s lack of experience in overseeing the construction of a mining project;
●risks related to the integration of businesses and assets acquired by Goldgroup;
●uncertainties related to the competitiveness of the mining industry;
●risk associated with theft;
●risk of water shortages and risks associated with competition for water;
●uninsured risks and inadequate insurance coverage;
●risks associated with potential legal proceedings;
●risks associated with community relations;
●outside contractor risks;
●risks related to archaeological sites and indigenous rights;
●foreign currency risks;
●risks associated with security and human rights; and
●risks related to mine tailings and the need for reclamation activities on Goldgroup’s properties.

​

This list is not exhaustive of the factors that may affect the Company’s forward-looking information. These and other factors should be considered carefully and readers should not place undue reliance on such forward-looking information.

​

Cautionary Note to U.S. Investors Concerning Estimates of Mineral Resources and Mineral Reserves

​

The disclosure in this MD&A uses mineral resource and mineral reserve classification terms that comply with reporting standards in Canada, and, unless otherwise indicated, all mineral resource and mineral reserve estimates included in this MD&A have been prepared in accordance with NI 43-101. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. These standards differ in certain respects from the requirements of the United States Securities and Exchange Commission (the “SEC”) set forth in Subpart 1300 of Regulation S-K (“S-K 1300”), which replaced the SEC’s former Industry Guide 7 effective for fiscal years beginning on or after January 1, 2021. Consequently, mineral resource and mineral reserve information contained in this MD&A may not be directly comparable to similar information disclosed by U.S. companies in accordance with S-K 1300.

​

Under S-K 1300, the SEC has adopted the Committee for Mineral Reserves International Reporting Standards (“CRIRSCO”) framework and has amended its definitions of proven and probable reserves to be substantially similar to international standards. However, differences remain between the definitions of proven and probable reserves used in NI 43-101 (which incorporates the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards) and those in S-K 1300, including differences in qualified person requirements, technical report requirements, and economic viability standards. Accordingly, mineral reserve estimates contained in this MD&A may not qualify as “mineral reserves” under S-K 1300 standards.

​

In addition, this MD&A uses the terms “measured mineral resources,” “indicated mineral resources” and “inferred mineral resources” to comply with the reporting standards in Canada. Under S-K 1300, the SEC now also recognizes these mineral resource categories using the CRIRSCO-based classification system; however, there is no assurance that mineral resources reported under NI 43-101 using CIM definitions would be the same had such estimates been prepared under the standards adopted in S-K 1300, as differences exist in the criteria for establishing “reasonable prospects for economic extraction” and in the supporting technical assessments required. Investors are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into mineral reserves. Further, “inferred mineral resources” have a great amount of uncertainty as to their existence and as to whether they can be mined legally or economically. Therefore, investors are also cautioned not to assume that all or any part of an inferred mineral resource exists. In accordance with both Canadian rules and S-K 1300, estimates of “inferred mineral resources” may not form the basis of feasibility or pre-feasibility studies (under S-K 1300, a qualified person may include inferred mineral resources in a cash flow analysis within an initial assessment, provided that certain cautionary statements are included). In addition, disclosure of “contained ounces” in a mineral resource estimate is permitted under both NI 43-101 and S-K 1300 provided that the grade or quality and the quantity of each category is stated. For the above reasons, information contained in this MD&A containing descriptions of our mineral resource and mineral reserve estimates may not be comparable to similar information made public by U.S. companies subject to S-K 1300.

Third Quarter – September 30, 2026‌Page 39

​


Graphic

Exhibit 99.5

Form 52-109F2
Certification of Interim Filings
Full Certificate

​

I, Javier Reyes, Chief Executive Officer of Goldgroup Mining Inc., certify the following:

1.Review: I have reviewed the interim financial report and interim MD&A (together, the “interim filings”) of Goldgroup Mining Inc. (the “issuer”) for the interim period ended September 30, 2026.

​

2.No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.
3.Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.

​

4.Responsibility: The issuer’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers’ Annual and Interim Filings, for the issuer.

​

5.Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer’s other certifying officer(s) and I have, as at the end of the period covered by the interim filings
(a)designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that

​

(i)material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and

​

(ii)information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and
(b)designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP.

​

5.1Control framework: The control framework the issuer’s other certifying officer and I used to design the issuer’s ICFR is the Internal Control – Integrated Framework published by The Committee of Sponsoring Organizations of the Treadway Commission (2013).

​

5.2ICFR – material weakness relating to design: N/A.

​

5.3Limitation on scope of design: N/A.

​


Graphic

6.Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer’s ICFR that occurred during the period beginning on July 1, 2026 and ended on September 30, 2026 that has materially affected, or is reasonably likely to materially affect, the issuer’s ICFR.

​

​

Date: November 16, 2026

“Javier Reyes”​ ​

Javier Reyes

Chief Executive Officer

​


Graphic

Exhibit 99.6

Form 52-109F2
Certification of Interim Filings
Full Certificate

​

I, Chet Holyoak, Chief Financial Officer of Goldgroup Mining Inc., certify the following:

1.Review: I have reviewed the interim financial report and interim MD&A (together, the “interim filings”) of Goldgroup Mining Inc. (the “issuer”) for the interim period ended September 30, 2026.

​

2.No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.
3.Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.

​

4.Responsibility: The issuer’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers’ Annual and Interim Filings, for the issuer.

​

5.Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer’s other certifying officer(s) and I have, as at the end of the period covered by the interim filings
(a)designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that

​

(i)material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and

​

(ii)information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and
(b)designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP.

​

5.1Control framework: The control framework the issuer’s other certifying officer and I used to design the issuer’s ICFR is the Internal Control – Integrated Framework published by The Committee of Sponsoring Organizations of the Treadway Commission (2013).

​

5.2ICFR – material weakness relating to design: N/A.

​

5.3Limitation on scope of design: N/A.

​


Graphic

6.Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer’s ICFR that occurred during the period beginning on July 1, 2026 and ended on September 30, 2026 that has materially affected, or is reasonably likely to materially affect, the issuer’s ICFR.

​

​

Date: November 16, 2026

“Chet Holyoak”​ ​

Chet Holyoak

Chief Financial Officer

​


Graphic

Exhibit 99.7

​

Goldgroup Reports Third Quarter 2026 Results: Revenue Up More Than 15-Fold, Cash Reaches $168 Million Following Merger and Financing

All figures in U.S. dollars unless otherwise noted.

Vancouver, BC – November 18, 2026 – Goldgroup Mining Inc. (NYSE American / TSXV: GORO) ("Goldgroup" or the "Company") is pleased to report its financial and operating results for the third quarter ended September 30, 2026. The quarter was the first to include the producing Don David Gold/Silver Mine in Mexico, which became part of the Company through the July 17, 2026 merger with Gold Resource Corporation. The result is a larger, better-funded company with two gold-producing operations, a third operation nearing production and a pipeline of growth projects.

​

Third Quarter Highlights

•Revenue grew more than 15 times. Quarterly revenue was $57.1 million, compared with $3.7 million in the same quarter last year. Don David contributed $44.4 million of that from July 17 onward.
•A much stronger cash position. Cash was $168.4 million at September 30, up from $9.6 million at the start of the year. The increase reflects a $121.8 million private placement completed on September 25 and $42.6 million of cash that came with the merger.
•Positive cash flow from operations. For the first nine months of 2026, operations generated

$12.9 million in cash.

•Improved production at Don David. Gold-equivalent production doubled to 27,228 ounces for the first nine months, up 101% from the same period last year.
•Cerro Prieto running well. The mine produced 10,999 ounces of gold in the first nine months, up 116% from 5,102 ounces a year ago.
•A healthier balance sheet. Working capital was a positive $14.9 million, compared with a shortfall of $40.3 million at December 31, 2025. Total assets rose to $653.5 million from $47.7 million a year ago.

​

Javier Reyes, Chairman and Chief Executive Officer of Goldgroup, commented, “This quarter marks an important milestone in Goldgroup’s transformation into a diversified, well-capitalized gold and silver producer. Following the completion of our merger with Gold Resource Corporation, we are already seeing the benefits of a larger operating platform, with a significant increase in revenue, positive cash flow from operations and a substantially strengthened balance sheet.

​

“What is particularly exciting is the opportunity ahead of us. We have two producing mines generating revenue, San Francisco advancing toward a potential restart in 2027, and Back Forty providing an additional longer-term growth opportunity. Combined with our substantial financial resources and strategic investment in Luca Mining, we believe Goldgroup is exceptionally well positioned to pursue further growth, capitalize on opportunities within the sector and build a leading intermediate precious

​


Graphic

metals company. Our focus remains on disciplined execution, strengthening our operations and creating meaningful value for our shareholders.”

​

Key Events

The merger created a bigger, stronger company. On July 17, 2026, Goldgroup completed a merger with Gold Resource Corporation. Goldgroup now owns the producing Don David Gold Mine in Oaxaca, the producing Cerro Prieto Gold Mine and the San Francisco Project in Sonora, and the Back Forty Project in Michigan. The Company began trading on the NYSE American under the ticker "GORO," giving it access to a larger pool of U.S. investors. Former Gold Resource shareholders received 0.3619 Goldgroup shares for each Gold Resource share they held, and the Company completed a one-for-four share consolidation as part of the transaction.

Investor confidence. On September 25, Goldgroup raised approximately $121.8 million by selling 33.4 million units at $3.65 each. Each unit included one common share and one-half of a warrant. In addition, shareholders exercised warrants and options for about $2.1 million during the first nine months, and a further $6.4 million of warrants were exercised after quarter-end.

A new strategic investment. On October 14, Goldgroup invested C$101.1 million in Luca Mining Corp., which is acquiring the Cozamin Mine. Once the deal closes and the investment converts to shares, Goldgroup would own about 19.9% of Luca. The agreement gives Goldgroup the right to nominate two directors and to take part in future financings to maintain its ownership percentage. After this investment, the Company still held approximately $97.5 million in cash.

​

Operations: Both Producing Mines Moving Forward

Don David (Oaxaca, Mexico). Don David produces gold, silver, zinc, lead and copper. Because the mine was owned by Gold Resource before the merger, the figures below cover the full period on a 100% basis so that they can be compared with last year.

•Gold-equivalent production rose 26% in the quarter to 8,742 ounces from 6,933 ounces.
•Ore processed rose 35% to 87,946 tonnes, and the plant handled 1,426 tonnes per day versus 1,124 a year ago.
•Gold production rose 20% to 1,972 ounces, and gold recovery improved to 76% from 71%.
•Zinc production more than doubled (up 116%) to 1,698 tonnes, and lead production rose 131% to 556 tonnes.

Mining at the Alta Gracia area, which provides extra ore for the mill, resumed in February 2026.

Cerro Prieto (Sonora, Mexico). Gold production rose 79% in the quarter to 3,019 ounces, from 1,684 ounces a year ago. Sales nearly tripled to 3,040 ounces from 1,096 ounces. The share of gold recovered from the ore stacked on the leach pads, a key efficiency measure, more than doubled to 61% from 28%, helped by the second crushing circuit installed in 2025. The Company is also studying whether gold can be recovered from material that has already been through the leach pads, which could add production in the future.

​


Graphic

Financial Results

The Company reported a net loss of $10.2 million for the quarter.

•When one company buys another, accounting rules require the acquired mines to be recorded at their current estimated value, which is much higher than their old book value. That higher value is then expensed gradually. In the third quarter, this produced a non-cash charge of $25.5 million, which caused the reported mine-level result to be a loss of $14.9 million. No cash left the Company because of this charge, and without it, the mines would have shown a profit for the quarter.
•The quarter also included one-time costs tied to the merger, the NYSE American listing and the financing, including share-based pay for new awards and professional fees.
•A non-cash gain of $16.2 million on the value of the Company's outstanding warrants partly offset these items, as did a $3.1 million income tax recovery.

Because the merger closed mid-July, the third quarter financial statements contain only about 11 weeks of Don David. Management expects future quarters to reflect a full period of the combined operations.

​

Looking Ahead

•San Francisco potential restart targeted for March 2027. The Company has started a 26,053-metre drilling program and is refurbishing the crushing plant, conveyors and processing facilities.
•Don David growth. Plans include underground drilling to extend mine life and exploration of the Margaritas and El Rey areas, within a land package of roughly 55,000 hectares.
•Cerro Prieto. The Company is exploring nearby areas and evaluating recovery of additional gold from previously leached material.
•Back Forty. The Company is advancing a feasibility study and permitting for this Michigan project, which it sees as a longer-term growth asset.

​

About Goldgroup Mining Inc.

Goldgroup is a Canadian-based mining company focused on becoming a premier intermediate gold and silver producer through disciplined operations, organic growth and strategic acquisitions. Its portfolio includes the producing Don David Gold Mine in Oaxaca and Cerro Prieto Gold Mine in Sonora, Mexico; the San Francisco Project in Sonora, Mexico; and the Back Forty Project in Michigan, United States. The Company's shares trade on the NYSE American and the TSX Venture Exchange under the symbol "GORO."

The Company's unaudited interim financial statements and Management's Discussion and Analysis for the period ended September 30, 2026 are available on SEDAR+ at www.sedarplus.ca.

​


Graphic

For more information, visit www.goldgroupmining.com.

Contact

Goldgroup Mining Inc. Javier Reyes

Chief Executive Officer jreyes@goldgroupmining.com

Sophia Shane

Corporate Development sshane@goldgroupmining.com 1 (604) 306-6867

www.goldgroupmining.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange accepts responsibility for the adequacy or accuracy of this news release.

​

Cautionary Note Regarding Forward-Looking Information

This news release contains forward-looking statements, including statements about the potential March 2027 restart of San Francisco, drilling and exploration programs, expected cash sufficiency, feasibility and permitting work at Back Forty, and the closing of Luca Mining Corp.'s acquisition of the Cozamin Mine. These statements are based on management's current expectations and are subject to risks and uncertainties, including metal prices, operating performance, permitting, financing, foreign exchange, political and regulatory conditions in Mexico and the United States, and the other risks described in the Company's Management's Discussion and Analysis. Actual results may differ materially. The Company undertakes no obligation to update forward-looking statements except as required by law. Average realized price per ounce is a non-IFRS measure; see the Company's MD&A for details.