Exhibit 96.1
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Table of Contents
| | | | | | | | |
| Table of Contents | i |
| 1 | Executive Summary | 1-1 |
| 1.1 | Summary | 1-1 |
| 1.2 | Technical Summary | 1-9 |
| 2 | Introduction | 2-1 |
| 2.1 | Site Visits | 2-1 |
| 2.2 | Sources of Information | 2-2 |
| 2.3 | List of Abbreviations | 2-3 |
| 3 | Property Description | 3-1 |
| 3.1 | Location | 3-1 |
| 3.2 | Land Tenure | 3-3 |
| 3.3 | Encumbrances | 3-7 |
| 3.4 | Royalties | 3-7 |
| 3.5 | Required Permits and Status | 3-7 |
| 3.6 | Other Significant Factors and Risks | 3-8 |
| 4 | Accessibility, Climate, Local Resources, Infrastructure and Physiography | 4-1 |
| 4.1 | Accessibility | 4-1 |
| 4.2 | Climate | 4-1 |
| 4.3 | Local Resources | 4-3 |
| 4.4 | Infrastructure | 4-3 |
| 4.5 | Physiography | 4-4 |
| 5 | History | 5-1 |
| 5.1 | Prior Ownership and Exploration History | 5-1 |
| 5.2 | Past Production | 5-3 |
| 6 | Geological Setting, Mineralization, and Deposit | 6-1 |
| 6.1 | Regional Geology | 6-1 |
| 6.2 | Local Geology | 6-3 |
| 6.3 | Property Geology | 6-5 |
| 6.4 | Mineralization | 6-8 |
| 6.5 | Deposit Types | 6-8 |
| 7 | Exploration | 7-1 |
| 7.1 | Exploration | 7-1 |
| 7.2 | Drilling | 7-4 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
| | | | | | | | |
| 7.3 | Hydrogeology and Geotechnical Data | 7-29 |
| 8 | Sample Preparation, Analyses, and Security | 8-1 |
| 8.1 | Sample Preparation and Analysis | 8-1 |
| 8.2 | Quality Assurance and Quality Control | 8-6 |
| 8.3 | Sample Security | 8-17 |
| 8.4 | SLR QP Comments | 8-19 |
| 9 | Data Verification | 9-1 |
| 9.1 | Pre-2011 Verification | 9-1 |
| 9.2 | 2021 Verification | 9-5 |
| 9.3 | SLR QP Comments | 9-14 |
| 10 | Mineral Processing and Metallurgical Testing | 10-1 |
| 11 | Mineral Resource Estimates | 11-1 |
| 11.1 | Summary | 11-1 |
| 11.2 | Resource Database | 11-3 |
| 11.3 | Geological Interpretation | 11-7 |
| 11.4 | Resource Assays | 11-14 |
| 11.5 | Treatment of High Grade Assays | 11-13 |
| 11.6 | Compositing | 11-13 |
| 11.7 | Trend Analysis | 11-14 |
| 11.8 | Search Strategy and Grade Interpolation Parameters | 11-15 |
| 11.9 | Bulk Density | 11-16 |
| 11.1 | Block Models | 11-18 |
| 11.11 | Cut-off Grade and Whittle Parameters | 11-19 |
| 11.12 | Classification | 11-20 |
| 11.13 | Block Model Validation | 11-22 |
| 11.14 | Mineral Resource Reporting | 11-24 |
| 12 | Mineral Reserve Estimates | 12-1 |
| 13 | Mining Methods | 13-1 |
| 14 | Processing and Recovery Methods | 14-1 |
| 15 | Infrastructure | 15-1 |
| 16 | Market Studies | 16-1 |
| 17 | Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups | 17-1 |
| 18 | Capital and Operating Costs | 18-1 |
| 19 | Economic Analysis | 19-1 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
| | | | | | | | |
| 20 | Adjacent Properties | 20-1 |
| 21 | Other Relevant Data and Information | 21-1 |
| 22 | Interpretation and Conclusions | 22-1 |
| 22.1 | General | 22-1 |
| 22.2 | Exploration | 22-1 |
| 22.3 | MRE | 22-1 |
| 22.4 | Geological Model | 22-2 |
| 22.5 | Topography | 22-2 |
| 22.6 | Collar Surveys | 22-3 |
| 22.7 | Downhole Surveys | 22-3 |
| 22.8 | Channels | 22-3 |
| 22.9 | Database | 22-4 |
| 22.1 | QA/QC and Assay Verification | 22-4 |
| 23 | Recommendations | 23-1 |
| 23.1 | Summary of Recommendations | 23-1 |
| 23.2 | Proposed Program and Budget | 23-4 |
| 24 | References | 24-1 |
| 25 | Reliance on Information Provided by the Registrant | 25-1 |
| 26 | Date and Signature Page | 26-1 |
| | | | | | | | |
| Tables | | |
| Table 1-1: | Summary of Mineral Resources – Effective July 3, 2026 | 1-3 |
| Table 3-1: | Corner Coordinates of Licence No. MEL 2007/01 | 3-5 |
| Table 3-2: | Corner Coordinates of Licence No. MEL 2012/25 | 3-5 |
| Table 3-3: | Corner Coordinates of Licence No. MEL 2021-10 Area 1 Aammaqqaagajik and area 2 Uuttortaavigajik | 3-5 |
| Table 5-1: | Summary of Historical Project Ownership and Exploration – 1986 to 2026 | 5-2 |
| Table 7-1: | Project Diamond Drilling Summary | 7-4 |
| Table 7-2: | Drill Hole Collar Locations, 1989-2011 | 7-6 |
| Table 7-3: | Interpreted Mineralized Horizons, 1989-2011 | 7-8 |
| Table 7-4: | MPM Drill Hole Locations, 2021 | 7-21 |
| Table 7-5: | Interpreted Mineralized Horizons, 2021 | 7-22 |
| Table 8-1: | Summary of QA/QA Sample Types and Insertion Rates | 8-11 |
| Table 8-2: | Summary of CRMs | 8-12 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
| | | | | | | | |
| Table 9-1: | 2020 Independent Witness Check Assay Results | 9-7 |
| Table 11-1: | Summary of Mineral Resources – Effective July 3, 2026 | 11-2 |
| Table 11-2: | List of Excluded Intervals Occluded or Partially Occluded by Dyke Material | 11-3 |
| Table 11-3: | Average Vertical Thicknesses of Mineralized Horizons | 11-11 |
| Table 11-4: | Length Weighted Sample Summary Statistics by Mineralized Layer | 11-13 |
| Table 11-5: | Length Weighted Composite Statistics by Mineralized Layer | 11-14 |
| Table 11-6: | Block Model Parameters (Leapfrog) | 11-18 |
| Table 11-7: | Mining Operating Cost Assumptions | 11-19 |
| Table 11-8: | Metal Price and Recovery Assumptions | 11-19 |
| Table 11-9: | Summary of Mineral Resources – Effective July 3, 2026 | 11-25 |
| Table 11-10: | Metal Price Sensitivity Cases | 11-26 |
| Table 11-11: | Net Percent Changes from Historical 2022 MRE | 11-29 |
| | | | | | | | |
| Figures | | |
| Figure 3-1: | Location Map | 3-2 |
| Figure 3-2: | Skaergaard Licence Areas | 3-4 |
| Figure 4-1: | Aerial View of Sødalen Airstrip and Base Field Camp | 4-2 |
| Figure 4-2: | Photograph of Miki Fjord and Skaergaard Fuel Storage | 4-5 |
| Figure 4-3: | Topography of Licence Area | 4-6 |
| Figure 6-1: | Regional Geology | 6-2 |
| Figure 6-2: | Local Geology | 6-4 |
| Figure 6-3: | Simplified Structural Sections of the Skaergaard Intrusion (Nielsen 2006) | 6-5 |
| Figure 6-4: | Stratigraphy of the Skaergaard Intrusion and Triple Group | 6-6 |
| Figure 6-5: | Simplified Structural Sections of the Skaergaard Intrusion (Nielsen 2006 | 6-7 |
| Figure 7-1: | Drilling and Channel Sampling | 7-5 |
| Figure 7-2: | Typical Section View, Central Portion of Skaergaard Deposit Facing East | 7-26 |
| Figure 8-1: | Gold Assays (log normal) for Coarse Reject Duplicate Samples (2020 Resampling) | 8-10 |
| Figure 8-2: | Gold Assays (log normal) for Pulp Duplicate Samples (2020 Resampling) | 8-11 |
| Figure 8-3: | Palladium Assays for Blank Samples | 8-12 |
| Figure 8-4: | Palladium Assays for CRM CDN-PGMS-30 | 8-13 |
| Figure 8-5: | Palladium Assays for CRM CDN-ME-1207 | 8-13 |
| Figure 8-6: | Palladium Assays for CRM CDN-ME-1309 | 8-14 |
| Figure 8-7: | Gold Assays for CRM CDN-GS-P4J (L – Au) | 8-14 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
| | | | | | | | |
| Figure 8-8: | Gold Assays for CRM CDN-GS-1X (H – Au) | 8-15 |
| Figure 8-9: | Palladium Assays (log scale) for Field Duplicates | 8-16 |
| Figure 8-10: | Palladium Assays (log scale) for Coarse Reject Duplicates | 8-17 |
| Figure 9-1: | Images from 2011 Site Visit | 9-4 |
| Figure 9-2: | Holes Resampled in 2020 | 9-6 |
| Figure 9-3: | Images from 2021 Site Visit | 9-10 |
| Figure 9-4: | Skaergaard Images: Gabbro | 9-11 |
| Figure 9-5: | 2021 Site Visit: Dyke Reconnaissance | 9-13 |
| Figure 11-1: | Channel Repositioning | 11-6 |
| Figure 11-2: | Geological Model | 11-8 |
| Figure 11-3: | PhotoSat Data in Leapfrog | 11-9 |
| Figure 11-4: | Dyke Modelling and Estimation Changes: H0 Example | 11-10 |
| Figure 11-5: | Mineralized Horizon Vertical Thickness | 11-12 |
| Figure 11-6: | Example Major Axis Variograms for H5 (Au), H3 (Au), and H0 (Pd) | 11-15 |
| Figure 11-7: | Density Histograms | 11-17 |
| Figure 11-8: | Mineralized Layer Models and Classification | 11-21 |
| Figure 11-9: | Example Block Validation Plan View, H0, Pd | 11-22 |
| Figure 11-10: | Example Swath Plot, H0, Pd | 11-23 |
| Figure 11-11: | NSR Cut-off Grade (US$/t) Sensitivity Excluding Inferred Material | 11-27 |
| Figure 11-12: | NSR Cut-off Grade (US$/t) Sensitivity Including Inferred Material | 11-28 |
| Figure 11-13: | 2022 MRE vs. 2026 MRE Classification Changes | 11-30 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
1.0 Executive Summary
1.1 Summary
SLR Environmental Consulting (Ireland) Ltd (SLR) was retained by Greenland Mines Ltd. (GRML) to prepare an independent Technical Report Summary (TRS) for the Skaergaard Project (Skaergaard or the Project), located in Southeast Greenland.
This TRS conforms to United States Securities and Exchange Commission’s (SEC) Modernized Property Disclosure Requirements for Mining Registrants as described in Subpart 229.1300 of Regulation S-K, Disclosure by Registrants Engaged in Mining Operations (S-K 1300) and Item 601 (b)(96) Technical Report Summary. S-K 1300 definitions, which are consistent with Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards for Mineral Resources and Mineral Reserves dated May 10, 2014 (CIM (2014) definitions), were used for Mineral Resource classification.
The purpose of this TRS is to update the historical November 2022 Mineral Resource estimate (the 2022 MRE) for the Project to conform to S-K 1300 standards for a technical report summary (TRS). The 2022 MRE used CIM (2014) definitions for Mineral Resource classification and was filed in Canada under another owner (SLR 2022). The updated MRE (the 2026 MRE) also used updated mining costs and metal price assumptions. This is the initial S-K 1300 TRS for the Project.
The Project is located in the central portion of Greenland's East Coast, approximately 450 km west of Iceland. GRML is a Nasdaq-listed company with two operating divisions: (1) Natural Resources, focused on the exploration and development of the Skaergaard Project in Southeast Greenland, one of the largest undeveloped palladium, gold, and platinum deposits in
the world; and 2) Cell and Gene Therapy, including Klotho Neurosciences, Inc.'s (Klotho) KLTO-202 primary indication for Amyotrophic Lateral Sclerosis. GRML holds an 80% interest in, and an option to acquire the remaining 20% of, the Skaergaard Project.
Skaergaard is a platinum group element-gold (PGE-Au) deposit hosted in the leucocratic gabbro layers (L0 to L3) of the Triple Group of the Skaergaard Intrusion, a layered mafic igneous complex in Southeast Greenland. The Project is situated in an area of extremely rugged mountainous terrain, glaciation, and frequently severe climatic conditions and is approximately 40% covered with glaciers, including the large Forbindelses Glacier. The mineralization is strongly layered, with seven horizons (H0 to H6) recognized.
The 2026 MRE consists of approximately 153 million tonnes (Mt) of Indicated Mineral Resources at a grade of 3.04 g/t of palladium equivalent (PdEq) containing 15 million ounces (Moz) of PdEq and approximately 177 Mt of Inferred Mineral Resources at a grade of 3.09 g/t PdEq containing 17.5 Moz PdEq.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
The 2026 MRE is based on information provided from a total of 93 diamond drill holes (DDH) and 30 channel samples, totalling 42,050 m of drilling and 1,409 m of channel sampling, completed between 1989 and 2021. There has been no drilling at the Project since 2021.
The 2026 MRE is built on interpreted mineralized horizons modelled in Leapfrog software, correlated in context of interpretation of the four (L0 through to L3) leucocratic gabbro horizons of the Triple Group, and developed using new PhotoSat topography and image data, palladium to gold (Pd:Au) ratios, platinum (Pt) concentration, and the new simplified geological model. Mineral Resources are estimated for two deposit areas: the main area, located south of the northern edge of the Forbindelses Glacier and under the glacier, and the area north of the Forbindelses Glacier.
For 2026, SLR has changed the grade and cut-off grade (COG) conventions to use NSR values and COG expressed in US$/tonne. SLR continues to provide a Pd equivalent grade in the Mineral Resource table for context.
A summary of the MRE at an NSR cut-off grade of US$84/t is presented in Table 1-1. Areas ‘North’ and ‘Main’ are separated by the northern lateral moraine of the Forbindelses Glacier, at approximately 7,563,500N. The SLR QP is of the opinion that with consideration of the recommendations summarized in Sections 1 and 23 of this TRS, any issues relating to all relevant technical and economic factors likely to influence the prospect of economic extraction can be resolved with further work.
The QP notes that exploration potential could extend to the limits of the mineralized Triple Group horizons inside the boundaries of the Skaergaard Intrusion, which is likely also constrained by the Marginal Border Series rock. Further drilling could increase the Inferred Mineral Resource, upgrade current Inferred Mineral Resources to Indicated Mineral Resource material, further define high- and low-grade areas of mineralization, and delineate barren dyke material more accurately.
With respect to further study, SLR notes that the new assay results on the northeastern plateau and the northern edge of the glacier, along with two historical holes and historical channel samples, will be used to assess the open pit potential in these areas and to choose a starting point for underground mining as part of a future Initial Assessment (IA). Additional holes may be needed to define the pit areas. This northern area will also be investigated for site infrastructure in the IA. Further study into the potential for underground bulk mining will also investigate increasing H0 thicknesses using a lower cut-off grade.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Table 1-1: Summary of Mineral Resources – Effective July 3, 2026
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Category | Mineralized Horizon | Area | Tonnage (Mt) | Grade (g/t) | Contained Metal (Moz) |
| PdEq | Pd | Au | Pt | PdEq | Pd | Au | Pt |
| Indicated | H5 | North | 0.2 | 5.03 | 0.27 | 2.22 | 0.04 | 0.03 | 0 | 0.01 | 0 |
| | Main | 18.3 | 5.24 | 0.58 | 2.16 | 0.07 | 3.09 | 0.34 | 1.27 | 0.04 |
| H3 | North | 3.9 | 3.42 | 0.43 | 1.38 | 0.05 | 0.43 | 0.05 | 0.17 | 0.01 |
| | Main | 39 | 3.02 | 0.81 | 1.02 | 0.06 | 3.79 | 1.01 | 1.27 | 0.07 |
| H0 | North | 18.8 | 2.64 | 2.13 | 0.16 | 0.15 | 1.6 | 1.29 | 0.1 | 0.09 |
| | Main | 73.3 | 2.57 | 2.07 | 0.15 | 0.16 | 6.06 | 4.87 | 0.35 | 0.39 |
| Total Indicated | All | 153.6 | 3.04 | 1.53 | 0.65 | 0.12 | 15 | 7.57 | 3.19 | 0.6 |
| | | | | | | | | | | |
| Inferred | H5 | North | 34.9 | 3.9 | 0.61 | 1.52 | 0.06 | 4.38 | 0.68 | 1.71 | 0.07 |
| H3 | North | 13.8 | 3.42 | 1.16 | 1.01 | 0.11 | 1.51 | 0.51 | 0.44 | 0.05 |
| | Main | 39.1 | 3.19 | 0.78 | 1.11 | 0.05 | 4.01 | 0.99 | 1.39 | 0.06 |
| H3_L1 | North | 0.1 | 3.64 | 0.51 | 1.46 | 0.04 | 0.01 | 0 | 0.01 | 0 |
| | Main | 8.3 | 3.17 | 0.95 | 1.01 | 0.07 | 0.85 | 0.25 | 0.27 | 0.02 |
| H0 | North | 15.1 | 2.52 | 1.92 | 0.21 | 0.14 | 1.22 | 0.93 | 0.1 | 0.07 |
| | Main | 66.2 | 2.59 | 2.06 | 0.17 | 0.16 | 5.51 | 4.38 | 0.35 | 0.33 |
| Total Inferred | All | 177.5 | 3.07 | 1.36 | 0.75 | 0.11 | 17.49 | 7.75 | 4.28 | 0.6 |
Notes:
| | | | | |
| 1 | The definitions for Mineral Resources in S-K 1300 were followed for Mineral Resources, which are consistent with CIM (2014) definitions. |
| | | | | |
| 2 | The Mineral Resource estimate is reported on a 100% ownership basis. |
| | | | | |
| 3 | Mineral Exploration Licences MEL 2007-01, MEL 2012-25, and MEL 2021-10 that comprise the Project are 100% owned by Major Precious Greenland A/S (MPG), which is 80% owned by Greenland Mines Ltd. (GRML) and 20% owned by Intrusion Precious Metals Corp. (IPMC). MEL 2007-01 covers the Skaergaard Intrusion, the main host of the Skaergaard deposit. Areas ‘North’ and ‘Main’ are separated by the northern lateral moraine of the Forbindelses Glacier, at approximately 7,563,500N |
| | | | | |
| 4 | Mineral Resources are reported on an in situ basis, applying factors for mining dilution, mining losses, and process losses. Net Smelter Return (NSR) calculations assume underground mining costs of US$32.17/t, processing costs of US$35/t, and general and administration (G&A) costs of US$16.67/t. NSR is calculated using the formula NSR Value = (91.83 * g/t Au) + (40.68 * g/t Pd) + (42.63 * [g/t Pt). |
| | | | | |
| 5 | Mineral Resources are reported at an NSR cut-off value of US$84 per tonne. |
| | | | | |
| 6 | Mineral Resources are estimated using long-term prices of US$3,500/oz Au, US$1,725//oz Pd, and US$2,100/oz Pt, and assume metallurgical recoveries of 86% Pd, 89% Au, and 80% for Pt, and standard commercial terms for a precious metals concentrate. |
| | | | | |
| 7 | A minimum mining width of 2.0 m was used. NSR for thicknesses less than 2.0 m was factored to 2.0 m to represent dilution. |
| | | | | |
| 8 | PdEq grades were calculated using the formula PdEq (g/t) = g/t Pd + (2.258 * g/t Au) + (1.048 * g/t Pt). |
| | | | | |
| 9 | Reasonable prospects for economic extraction (RPEE) were satisfied by constructing polygons using blocks above the NSR cut-off value for thicknesses greater than 2.0 m and NSR cut-off value factored to 2.0 m to represent dilution where thicknesses are less than 2.0 m. RPEE included a visual check on the geometry and spatial continuity of the mineralization. |
| | | | | |
| 10 | The Main area includes material south of the northern edge of the Forbindelses Glacier and under the glacier, and the North area includes material to the north of the Forbindelses Glacier. |
| | | | | |
| 11 | Bulk density is 3.12 t/m3. |
1.Numbers may not add due to rounding.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
1.1.1 Conclusions
SLR QP offers the following conclusions.
1.1.1.1 General
•The Skaergaard Intrusion is an example of a layered mafic igneous complex with stratiform PGE-Au and iron–titanium (Fe-Ti) oxide mineralization. The Skaergaard Intrusion is exposed over an area of 70 km², with approximate dimensions of 7.5 km (east-west) and 11 km (north-south). It has a tabular, sill-like, bowl-shaped geometry, which dips southwards between 18° and 30°.
a.The Layered Series is subdivided petrographically into the Upper, Middle, Lower, and Hidden zones. Within the upper 90 m of the Middle Zone is the Triple Group, which is a rhythmically banded plagioclase-augite-titanomagnetite-ilmenite cumulate consisting of interbanded leucocratic and melanocratic gabbro layers. All known PGE mineralization is associated with the Triple Group that thickens towards the centre of the intrusion and shows a greater concentration of Fe-Ti oxide layers towards the margins.
•The drilling, surveying, core collection, transport, logging, sampling, quality assurance and quality control (QA/QC), and security procedures meet industry standards and are of sufficient quality to support a Mineral Resource estimate.
•There are no known drilling, sampling or recovery factors that could materially impact the accuracy and reliability of the MRE results.
1.1.1.2 Exploration
•The summer 2021 program of 7,787 m of drilling in 32 DDH, and four channel samples affirmed significant grades across the main part of the deposit under the glacier, and expanded classified material at the west and east margins, and to the north. This information was used in the 2022 MRE which included updates in mineral horizon selection interpretation, horizon thickness statistics, glacial bathymetry, and a change to physical dyke modelling.
•Further exploration could extend to the limits of the mineralized Triple Group horizons inside the boundaries of the Skaergaard Intrusion, which is likely also constrained by the Marginal Border Series rock. Further drilling could increase the Inferred Mineral Resource, upgrade current Inferred Mineral Resources to Indicated Mineral Resource material, further define high and low grade areas of mineralization, and delineate barren dyke material more accurately.
1.1.1.3 MRE
•An updated 2026 MRE was prepared by SLR, using DDH and channel sample data generated by MPM and its predecessors to create an updated block model. The MRE is based on information provided from 93 DDH and 30 channel samples, totalling 42,050 m of diamond drilling and 1,409 m of channel sampling, completed between 1989 and 2021. The MRE also includes the results of the 2020 SLR resampling of most of the 2011 core.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
•The updated MRE, with an effective date of July 3, 2026, consists of:
a.Indicated Mineral Resources of 153.6 Mt at a grade of 3.04 g/t PdEq containing 15.0 Moz of PdEq
b.Inferred Mineral Resources of 177.5 Mt at a grade of 3.07 g/t PdEq containing 17.5 Moz PdEq.
•The 2026 MRE includes updates to metal price and mining cost assumptions, and changes to NSR cut-off value reporting along with updated classification extents based on the new parameters.
•The 2026 Mineral Resources are estimated using long-term prices of US$3,500/oz Au, US$1,725/oz Pd, and US$2,100/oz Pt, and assume metallurgical recoveries of 86% Pd, 89% Au, and 80% for Pt, and standard commercial terms for a precious metals concentrate, and assumes an underground mining scenario.
•The 2020 resampling program results for palladium, gold, and platinum are of sufficient quality to support Mineral Resource estimation as incorporated into the Mineral Resource database. The QP notes that statistical analyses showed results close to those of the original assays, suggesting that grades are fairly uniform and repeatable.
•The bulk density review indicates that density would be more appropriately set at the gabbro average of 3.12 g/cm3 for the purposes of the Mineral Resource estimate.
1.1.1.4 Geological Model
•SLR has produced a wireframe model of the geology of the Skaergaard deposit, using sectional information, drilling, and mapping.
•SLR has produced a wireframed interpretation of the L0 through L3 leucocratic gabbro marker horizons of the Triple Group, using the drill data and the new PhotoSat data.
•SLR has modelled four of the mineralized horizons, H0, H3L1, H3, and H5, using the light-coloured (leucocratic) horizon interpretation as a positional guide.
•The primary dyke orientation and thicknesses run approximately east-west, and the secondary orientations run approximately north-south in a perpendicular fashion. These dykes show extensive continuity and persistent thicknesses in both vertical and lateral dimensions, and crosscut the leucocratic L0-L3 horizons in outcrop north of the Forbindelses Glacier. The camp area likely over-represents barren dyke material, which may in part explain the lower camp elevations.
•SLR has produced a semi-quantitative physical model of the dominant east-west trending mafic dykes.
•There is a good correlation between low magnetic susceptibility readings and leucocratic gabbros.
1.1.1.5 Topography
•For 2021, MPM procured 0.5 m Landsat topography data and imagery covering the Skaergaard Intrusion and adjacent area around Miki’s Fjord from PhotoSat. The relative horizontal accuracy of PhotoSat's precision orthophotos is generally better than 50 cm over distances of 10 km. For elevation, the root mean square error (RMSE) of the PhotoSat survey is 15 cm.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
1.1.1.6 Collar Surveys
•Original borehole coordinates, collar elevations, and depths drilled from the surface of the Forbindelses Glacier are based on historical surveying. This glacier has significantly receded since 1989.
•In July 2011, a total of 39 drill holes and two channels were surveyed with real-time kinematic positioning (RTK-GPS) equipment by Asiaq Greenland Survey (Asiaq). The remaining 32 historical DDH and 24 historical channels were not located and not resurveyed.
•In August and September 2021, Asiaq surveyed all drill hole collars and channels completed in the 2021 field season. Asiaq also established a new fixed point on Kraemer Island, which can be used for future survey work.
•The distance between topographic surface and current collar elevations is generally between 5 m and 10 m above the topographic surface but is often ± 5 m. The distance between topographic surface and pre-2011 collar elevations is generally within ± 5 m but can be up to ± 35 m in holes with a D* prefix. The QP considers that this leads to some waviness in the mineralized horizons but does not materially affect the MRE.
1.1.1.7 Downhole Surveys
•Nine 2021 holes lack good-quality downhole survey data but likely have similar deviation to the other 2021 holes at depth, given the consistency of the rock package and relative lack of structure. In addition, the 300 m to 600 m spacing of the holes outweighs any positional change in horizons resulting from hole deviation. The broad spacing of the drilling and the consistent dip results of planned dips offset concerns about this downhole survey data.
•The poor downhole survey QC on some of the 2021 drill holes would not have a material impact on the MRE.
1.1.1.8 Channels
•Using updated PhotoSat topography data and new imagery in the context of the updated geology and mineralization interpretation, SLR has repositioned the unsurveyed channel samples north of the Forbindelses Glacier with sufficient confidence to classify Inferred Mineral Resources in the area.
•The excellent work done in surveying the extant historical channels with handheld GPS and photographing them shows that SLR’s 2021 historical channel repositioning was accurate in a general sense, but samples may be at lower elevation on the west side of the outcrop. Sample lengths and surveyed lengths, and azimuths do not agree with the historical samples in the SLR database. Historical channels do not support any classification above Inferred Mineral Resource.
•The 2021 channel sampling contributes to the interpretation of the mineralized horizons, but handheld GPS pickups of pre-2011 samples correlate poorly with historical lengths, positions, and orientations.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
1.1.1.9 Database
•The database is currently composed of several separate components, which were assembled and exported to the Mineral Resource database, and is not currently warehoused in an industry-standard geological information management system (GIMS).
1.1.1.10 QA/QC and Assay Verification
•Sample preparation and analysis workflows and practices are sufficient to support an updated MRE.
•QA/QC information is limited for drilling and sampling data prior to 2000, but relatively complete for 2008 to 2011 information in the Mineral Resource database. SLR reviewed available QA/QC reports and did not identify any significant issues. QA/QC programs, as designed and implemented by the prior owners, were based on industry-standard practices at the time.
•Historical assay certificate information is also limited for drill data prior to 1990. This impacted the verification of the assays in the Mineral Resource database. SLR’s verification of the available certificate data did not show any significant discrepancies.
•The QA/QC program implemented for the 2021 field program meets industry standard practice, and no significant contamination or bias was identified. In SLR’s opinion, however, for future drilling programs, the current certified reference materials (CRM) should be reviewed to ensure that the sample matrix is suitable for the mineralization at Skaergaard.
•The information contained in the Mineral Resource database is of sufficient quality to support the Mineral Resource estimate.
1.1.2 Recommendations
SLR QP offers the following recommendations.
1.1.2.1 Exploration
1.To confirm historical drilling and potentially define additional Inferred and Indicated Mineral Resources, fan drill holes through the down-dip extension south of the Forbindelses Glacier, where it is possible to install drill pads in the rugged terrain.
| | | | | | | | |
| 2 | Carry out additional drilling at the western margin to increase the Inferred Mineral Resource, upgrade current Inferred Mineral Resources to Indicated, further define high-and low-grade areas of mineralization, and delineate barren dyke material more accurately. |
1.Using different dips, redrill holes where drilling has intersected barren dyke material.
2.Investigate the potential of titanium, vanadium, gallium, and other metals for their potential extractive value in underground or surface bulk mining studies.
3.Drill the remainder of the 300 m spaced holes, then move to deeper holes on the west side to validate the 1990 and 1994 drill holes.
4.Drill the main shallow part of the deposit at 150 m spacing to ensure that the assessment of low spatial grade variability is correct for an Initial Assessment (IA) level study.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
1.Perform a mapping program over Skaergaard, possibly incorporating aerial drone photos, to appraise the dykes.
2.Carry out a program that would incorporate denser drill spacing, study of an initial pilot open pit and transition to underground mining, field reviews of historical drill collar locations, geological and structural mapping, and resampling of surface mineralization to confirm the continuity of the mineralization and potential extensions, as well as the implementation of environmental and social baseline studies, metallurgical test work, for completion of an IA, at an approximate cost of US$15 million.
1.1.2.2 MRE
1.Investigate other mining scenarios, including open pit and underground bulk mining with potentially lower cut-off grades.
2.Investigate the potential underground bulk mining viability of a thicker H0 horizon selected using a lower NSR cut-off grade.
3.Perform thorough geotechnical investigation to characterize rock and rock mass strength pertinent to mine and infrastructure design, including:
| | | | | | | | |
| a) | Geotechnical mapping of outcropping mineralized and surrounding horizons |
a.More thorough geotechnical borehole logging, sufficient to assign Q and/or RMR characterizations
b.Sample collection for geotechnical laboratory testing (UCS, Triaxial etc.)
1.1.2.3 Geology
1.Continue investigation into using magnetic susceptibility (possibly confounded by dyke material) to roughly locate the stratigraphic position of mineralized horizons, both to position sampling and to help correlate mineralized horizons from hole to hole.
2.Use trace element data to help correlate horizons in future models.
| | | | | | | | |
| 3 | Update the geological model with projections of the Marginal Border Group. |
1.Further refine the bathymetry of the ocean in the Mineral Resource model volume.
2.Conduct further mapping, reconnaissance and aerial photography work to understand dyke distribution and orientations.
3.Harmonize MRE horizon nomenclature with stratigraphic nomenclature in the next MRE.
1.1.2.4 Topography
1.Obtain an air photograph in late summer when there is minimal snow cover.
1.1.2.5 Collar Surveys
1.Retain a GIS professional to review the collar positions to ensure that the correct datums and conversions are used for each hole position.
1.1.2.6 Downhole Surveys
1.Retain a dedicated geological technician for subsequent drill programs to check the orientation of each hole before drilling and perform the continuous downhole surveys at drilling completion as a QC check and superseding survey to those performed during drilling.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
1.1.2.7 Channels
1.Collect additional channel samples to support existing channel information, where safely achievable.
1.1.2.8 Database
1.Digitize historical hard copy density data.
2.Migrate the Skaergaard database to an industry-specialized geodatabase software package which includes validated imports for log, survey, and assay information.
3.Update the Project database with separate PGE-Au and trace element tables based on different assay priorities in the compiled, overlapping raw assay table.
4.Perform a full database compilation from the various historical and current source components in different formats, and then migrate the datasets to an industry-standard GIMS prior to the next MRE. All available densities should be incorporated into a separate table.
5.Complete an exhaustive search of all compiled files and reports, including internal report appendices, for more assay certificates, and audit any additional found information against the historical sample ID and grade information contained in the Project database, ensuring that certificate records exactly match those of the database.
| | | | | | | | |
| 6 | Review/relog extant core where data, e.g., lithology, is missing. |
1.Centralize the drill core to one secured location, to achieve a complete and coherent physical database for the deposit.
1.1.2.9 QA/QC and Assay Verification
1.Relog or check-log any extant drill core. Locate and investigate unsampled intervals for core sampling.
2.Consider searching for and assaying unsampled intervals in the extant core located in various places.
3.Continue to review all CRMs for appropriateness, and source an alternative mid-grade platinum and palladium CRM with a more appropriate matrix for future drill programs.
4.Complete incorporation of multi-element assays into the Mineral Resource database in Leapfrog, in order to perform various internal studies and to determine correlations between other elements and mineralization/stratigraphy.
1.2 Technical Summary
1.2.1 Property Location and Description
The Project is located in the central portion of Greenland's East Coast, approximately 450 km west of Iceland. The nearest towns are Ittoqqortoormiit (population of 330), located approximately 450 km to the northeast, and Tasiilaq (population of 1,800), formerly known as the Ammassalik and Angmagssalik villages, located approximately 400 km to the southeast. Nuuk (population of 19,900), the capital of Greenland, is located approximately 1,000 km to the southwest. Statistics Greenland indicates that the total population of Greenland was approximately 56,540 people as of January 1, 2025.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
The closest major population centre is Reykjavik (population of 240,000), Iceland, approximately 630 km to the southeast.
The Project is accessed by charter airplane from Akureyri, located in the north of Iceland, approximately 250 km northeast of the Icelandic capital of Reykjavik, to Sødalen (SOD), in eastern Greenland. Skaergaard is located approximately 12 km from Sødalen, and due to the steep terrain, a short helicopter flight is required to reach the property. The Project is also
accessible by coastal shipping and marine craft in the Mikis Fjord and other inlets/fjords near the Skaergaard Intrusion when there is no sea ice, generally between July and early October.
There are no road or rail connections between the Project and Greenlandic communities.
Skaergaard is located in an Arctic climatic zone characterized by long, cold winters and short, cool summers. The extreme winter climate and limited daylight limit exploration activities to the summer months. Water for summer exploration drilling is restricted to glacial runoff in small seasonal streams.
There are few to no local sources of supplies or materials in eastern Greenland, and all fuel, supplies, materials, and equipment used for exploration and drilling activities are typically transported by aircraft or ship (barge) from either Iceland (the closest destination) or western Greenland (Kangerlussuaq or Nuuk). Exploration and mining operations in Greenland must generally be organized from a base level with new equipment and infrastructure suited to remote locations.
Experienced labour is available from western Greenland, and general labour is available from the local communities of Illoqqortoormiut and Tasiilaq. GRML has reported that the Project enjoys the support of local communities.
An exploration field base camp has traditionally been located adjacent to the Sødalen airstrip. The camp built by the previous operator, Platina Resources Limited (Platina), in 2007, currently consists of 10 Weatherhaven tents, was last used by Platina during the 2011 field season, and has been used by Longland Resources (now owned by Conico Ltd.) since 2017. For future exploration requirements, GRML plans to either upgrade the field base camp at Sødalen or use a passenger charter ship (converted icebreaker) to house geological and field personnel, in addition to drilling, helicopter, and logistics personnel on site.
1.2.2 Land Tenure
The Mineral Exploration Licences (MEL) that comprise the Project, MEL 2007-01, MEL 2012-25 and MEL 2021-10 are 100% owned by Major Precious Greenland A/S, which is 80% owned by GRML and 20% owned by Intrusion Precious Metals Corp. (IPMC). Greenland Mines Corp., a privately held Delaware corporation, acquired an 80% interest in the Project from MPM on February 25, 2026. On March 3, 2026, Klotho announced a definitive merger agreement with Greenland Mines Corp., which closed on March 4, 2026, and the combined entity subsequently changed its name to Greenland Mines Ltd.
All three MELs are in good standing as of the effective date of this Technical Report. As the 80% owner of Major Precious Greenland A/S and the hereto granted three MELs, GRML will be the company referred to throughout the TRS unless the relationship outlined above is relevant.
There are no royalties on the Project, except those payable to the Government of Greenland from revenue received upon reaching the production stage.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
SLR is not aware of any environmental liabilities on the property. Greenland Mines Ltd. has obtained all required permits to conduct the proposed work on the property. SLR is not aware of any other significant factors and risks that may affect access, title, or the right or ability to perform the proposed work program on the property.
1.2.3 History
Although the Skaergaard Intrusion was discovered by L. R. Wager in 1930, exploration efforts increased in 1986 when Platinova Resources Ltd. (Platinova) acquired the Project. From 1986 to 1991, Platinova conducted channel sampling and drilled more than 16,000 m of diamond drill core. Platinova and Corona Corporation (Corona) formed a joint venture (Platinova Corona JV) in 1988.
Platinova found anomalously high concentrations of gold in stream sediments and whole rock samples from the intrusion. Subsequent exploration by channel sampling, drilling, and assaying identified a stratabound zone rich in palladium and
gold in the upper 100 m of the Middle Zone in the Layered Series of the intrusion. This zone, subsequently known as the Platinova Reef, can be traced in outcrop and underground across two-thirds of the intrusion's area.
Gryphon Metals Corporation (Gryphon) in 2000 and Skaergaard Minerals Corporation (SMC) in 2003 both carried out exploration programs.
Platina took over the concession in 2007 and drilled more than 35,000 m of core between 2007 and 2011. A scoping study was completed on behalf of Platina in 2007 and studies were initiated to support a prefeasibility study in 2008, however, the Project was not advanced at that time due to metal prices.
In 2020, MPM acquired Skaergaard from Platina. GRML acquired an 80% interest in the Project through a merger in March 2026.
Several historical resource estimates have previously been prepared for the Project, with the most recent estimate in 2022. These estimates are considered to be historical in nature, are relevant as they indicate the presence of mineralization on the Project, however, they should not be relied upon.
The Skaergaard deposit has been the subject of several metallurgical test work programs between 1988 and 2009. Investigations into potential treatment routes and the selection and optimization of saleable products are still at a relatively early stage, although results have been encouraging in terms of gold extraction.
There has been no past production from the Project.
1.2.4 Geological Setting, Mineralization, and Deposit
The Skaergaard Intrusion, which is part of the Palaeogene Magmatic Province, is a series of gabbro and syenite intrusions which formed approximately 55 million years ago, during the opening of the Atlantic Ocean. The Skaergaard Intrusion lies between Archean basement gneisses and amphibolites, and a succession of late-Cretaceous sediments and Paleocene-Eocene flood basalts.
A post-intrusion monoclinal folding event caused a regional eastward rotation of fault blocks, dipping 15° to 20° to the south, and an eastward dip of previously vertical dykes. The development of the monocline structure was accommodated by Tertiary normal faulting at various scales, ranging from slips along dyke margins to larger fault zones. Some faults have been inferred and/or mapped in the Skaergaard Intrusion, but they are generally far apart and show only minor offsets. Most of these faults are parallel to the monocline's hinge. A mafic sheeted dyke swarm runs parallel to the coastline between latitudes 66° and 70°.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
The Skaergaard Intrusion is exposed over an area of approximately 70 km2 with dimensions of approximately 7.5 km (east-west) and 11 km (north-south) and has a tabular, sill-like geometry. The geometry was determined by faults that intersect the intrusion layers at approximately 90°. Its depth extent is estimated at four kilometres.
The intrusion is subdivided into the following groups:
•The Marginal Border Series, several hundred metres thick, is the product of crystallization along the walls of the magma chamber,
•The Upper Border Group, approximately 900 m thick, is the product of downward crystal growth from the roof; and
•The Layered Series, approximately 2,500 m thick, which accumulated upwards.
The Skaergaard Intrusion is an example of a layered mafic igneous complex with stratiform PGE-Au and Fe-Ti oxide mineralization. The Layered Series is subdivided petrographically into the Upper, Middle, Lower, and Hidden zones.
Within the upper 90 m of the Middle Zone is the Triple Group, which is a rhythmically banded plagioclase-augite-titanomagnetite-ilmenite cumulate consisting of interbanded leucocratic and melanocratic gabbro layers. All known PGE
mineralization is associated with the Triple Group that thickens towards the centre of the intrusion and shows a greater concentration of Fe-Ti oxide layers towards the margins.
The PGE-Au occur as complex alloys of mixed precious metals with base metals (iron and copper).
1.2.5 Exploration
The last historical exploration on the Project took place in 2021. In the summer of 2021, MPM completed 32 diamond drill holes for approximately 7,787 m of drilling and 241 m of channel sampling.
In SLR’s opinion, there is excellent potential at Skaergaard to confirm the continuity, grade, and thickness, and extend the known mineralization within the favourable geological environment on the Project. Further exploration and evaluation activities are warranted.
1.2.6 Mineral Resource Estimate
A summary of the July 3, 2026 MRE is provided in Table 1-1.
The updated MRE builds on the work that was undertaken for the 2022 MRE. The Mineral Resource database is based on the 2022 MRE database, which includes 1989 to 2011 and 2021 drilling and sampling information. There has been no drilling since the 2022 MRE.
For the 2026 MRE, the geological model remains relatively unchanged from that constructed by SLR in 2021 and updated for the 2022 MRE. Given that drill holes are spaced approximately 250 m to 700 m apart and mineralized horizons are two metres to four metres thick, SLR used full length composites for each of the mineralized horizons, so that each mineralized horizon intercept on each hole is represented by one composite. Grade interpolation for each mineralized horizon was performed by a spherical search using inverse distance cubed (ID3) in three separate passes at 600 m, 1,200 m, and 3,300 m. A sub-blocked model was built in Leapfrog, splitting 20 m x 20 m blocks by the height of each model horizon, with each block dipping directly south at the average 20° dip of the mineralized horizons. SLR chose the block size and dip to maximize the continuity of the blocks on each mineralized horizon. Block validation was performed by generating a series of plan views of block grades and composite grades for Pd, Au, and Pt for each mineralized horizon. SLR also ran a nearest neighbour (NN) estimate concurrent to the ID³ estimate, and generated swath plots and statistical comparisons for each horizon.
Mineral Resources were estimated at an NSR cut-off grade of US$84 per tonne, based on an assumed underground mining scenario. Mineral Resources were classified as Indicated and Inferred.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
2.0 Introduction
SLR Environmental Consulting (Ireland) Ltd (SLR) was retained by Greenland Mines Ltd. (GRML) to prepare an independent Technical Report Summary (TRS) for the Skaergaard Project (Skaergaard or the Project), located in Southeast Greenland. The historical 2022 Mineral Resource estimate (MRE) was filed in Canada by Major Precious Metals Corp. (MPM) and conforms to CIM (2014) definitions. The purpose of this TRS is to update the historical November 2022 resource estimate using current mining cost and metal price assumptions for the Project to conform to S-K 1300 standards for a TRS for public disclosure. SLR visited the property from August 21 to August 29, 2021. No new exploration work or drilling has been completed on the property since this time.
This TRS conforms to United States Securities and Exchange Commission’s (SEC) Modernized Property Disclosure Requirements for Mining Registrants as described in Subpart 229.1300 of Regulation S-K, Disclosure by Registrants Engaged in Mining Operations (S-K 1300) and Item 601 (b)(96) Technical Report Summary.
Mineral Exploration Licences (MEL) 2007-01, MEL 2012-25, and MEL 2021-10 that comprise the Project are 100% owned by Major Precious Greenland A/S (MPG), which is 80% owned by GRML and 20% owned by MPM (now Intrusion Precious Metals Corp. (IPMC)). MPM acquired the Project from Platina Resources Limited (Platina) in
November 2020. In February 2026, Greenland Mines Corp., a privately held Delaware corporation, acquired an 80% interest in the Project from IPMC and was in turn acquired by Klotho Neurosciences, Inc. (Klotho) through a merger in March 2026. The combined entity was subsequently renamed Greenland Mines Ltd. All three MELs are in good standing as of the date of this Technical Report. MEL 2007-01 is the main MEL which covers the Skaergaard Intrusion.
Skaergaard is a platinum group element-gold (PGE-Au) deposit hosted in the leucocratic gabbro layers (L0 to L3) of the Triple Group of the Skaergaard Intrusion, a layered mafic igneous complex in Southeast Greenland. The Project is situated in an area of extremely rugged mountainous terrain, glaciation, and frequently severe climatic conditions and is approximately 40% covered with glaciers, including the large Forbindelses Glacier. The mineralization is strongly layered, with seven horizons (H0 to H6) recognized.
The 2026 MRE is based on information provided from a total of 93 diamond drill holes (DDH) and 30 channel samples, totalling 42,050 m of drilling and 1,409 m of channel sampling, completed between 1989 and 2021. The updated MRE assumes an underground mining scenario at Skaergaard.
This is the first TRS on the Project.
2.1 Site Visits
SLR QP visited the site on August 21 to 26, 2021, during the completion of the latest drill season. No exploration work or drilling has been completed since that time. At this time, discussions were held with the following MPM personnel to support the historical MRE:
•Gustavo Delendatti, VP Exploration
•Jim Sparling, Skaergaard Project Manager
•Chris Roney, Senior Geologist
Previous site visits were undertaken by SLR in 2020. Details of the 2021 and previous site visits are outlined in Section 9.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
2.2 Sources of Information
During the preparation of this TRS, discussions were held with personnel from GRML:
•Bo Møller Stensgaard, Ph.D., President, GRML.
•Gustavo Delendatti, Geological Consultant, GRML
The documentation reviewed and other sources of information are listed at the end of this TRS in Section 24.0 References.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
2.3 List of Abbreviations
Units of measurement used in this TRS conform to the metric system. All currency in this TRS is US dollars (US$) unless otherwise noted.
| | | | | | | | | | | |
| m | micron | kVA | kilovolt-amperes |
mg | microgram | kW | kilowatt |
| a | annum | kWh | kilowatt-hour |
| A | ampere | L | litre |
| bbl | barrels | lb | pound |
| Btu | British thermal units | L/s | litres per second |
| °C | degree Celsius | m | metre |
| C$ | Canadian dollars | M | mega (million); molar |
| cal | calorie | m2 | square metre |
| cfm | cubic feet per minute | m3 | cubic metre |
| cm | centimetre | MASL | metres above sea level |
cm2 | square centimetre | m3/h | cubic metres per hour |
| d | day | mi | mile |
| dia | diameter | min | minute |
| dmt | dry metric tonne | mm | micrometre |
| dwt | dead-weight ton | mm | millimetre |
| °F | degree Fahrenheit | mph | miles per hour |
| ft | foot | MVA | megavolt-amperes |
| ft2 | square foot | MW | megawatt |
| ft3 | cubic foot | MWh | megawatt-hour |
| ft/s | foot per second | oz | Troy ounce (31.1035g) |
| g | gram | oz/st, opt | ounce per short ton |
| G | giga (billion) | ppb | part per billion |
| Gal | Imperial gallon | ppm | part per million |
| g/L | gram per litre | psia | pound per square inch absolute |
| Gpm | Imperial gallons per minute | psig | pound per square inch gauge |
| g/t | gram per tonne | RL | relative elevation |
gr/ft3 | grain per cubic foot | s | second |
gr/m3 | grain per cubic metre | st | short ton |
| ha | hectare | stpa | short ton per year |
| hp | horsepower | stpd | short ton per day |
| hr | hour | t | metric tonne |
| Hz | hertz | tpa | metric tonne per year |
| in. | inch | tpd | metric tonne per day |
in2 | square inch | US$ | United States dollar |
| J | joule | USg | United States gallon |
| k | kilo (thousand) | USgpm | US gallon per minute |
| kcal | kilocalorie | V | volt |
| kg | kilogram | W | watt |
| km | kilometre | wmt | wet metric tonne |
km2 | square kilometre | wt% | weight percent |
| km/h | kilometre per hour | yd3 | cubic yard |
| kPa | kilopascal | yr | year |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
3.0 Property Description
3.1 Location
The Project is located in the central portion of the East Coast of Greenland, approximately 450 km west of Iceland (Figure 3-1, showing air routes with orange lines). Coordinates for the centre of the deposit are Latitude 6810'54.8'' N and Longitude 3140'8.5'' W (WGS84). The Mineral Exploration Licence on which the deposit resides, MEL 2007-1, is 107 km2 in area.
The nearest townships are Ittoqqortoormiit (population of 330), located approximately 450 km to the northeast, and Tasiilaq (population of 1,800), formerly known as the Ammassalik and Angmagssalik villages, located approximately 400 km to the southeast. Nuuk (population of 19,900), the capital of Greenland, is located approximately 1,000 km to the southwest. The total population of Greenland is approximately 56,540 people.
The closest major population centre is Reykjavik (population of 240,000), Iceland, approximately 630 km to the southeast. The population of Iceland is approximately 394,000 people.
Greenland is an autonomous country within the Danish Realm. It is the largest island in the world, with an area of 2,166,086 km2, yet it has a small population of 57,000. Most of the island is covered by the Greenland ice sheet. The population lives along the coastal fringe, which is heavily incised by fjords. Most of the population is located on the west and south coasts, with Nuuk, the capital, as the largest settlement.
Greenland is considered a stable jurisdiction with a European-style democracy and strong ties to Denmark. Greenland's annual GDP is approximately US$2.7 billion, predominantly generated by fishing exports and minor agricultural activities.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 3-1: Location Map
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
3.2 Land Tenure
Mineral Exploration Licences MEL 2007-01, MEL 2012-25, and MEL 2021-10 that comprise the Project are 100% owned by Major Precious Greenland A/S (MPG), which is 80% owned by GRML and 20% by MPM, now Intrusion Precious Metals Corp.(IPMC). MPM acquired the Project from Platina in November 2020. In February 2026, Greenland Mines Corp., a privately held Delaware corporation, acquired an 80% interest in the Project from IPMC, and was in turn acquired by Klotho through a merger in March 2026, whereby it got listed on NASDAQ under the name Greenland Mines Ltd. and the ticker symbol GRML. The combined entity was subsequently renamed Greenland Mines Ltd. All three MELs are in good standing as of the date of this TRS.
MEL 2007-01 is the main MEL which covers the Skaergaard Intrusion (Figure 3-2 and Table 3-1). MEL 2007-1 is 107 km2 in size and was granted by the Greenland Mineral Licence and Safety Authority (MLSA) in 2007 with an original expiry date of December 31, 2022. An Addendum to MEL 2007-01 was granted on January 5, 2021 by the MLSA regarding the
change of the licence period and a temporary adjustment down to zero Danish Krone (DKK) for the yearly required exploration expenses for 2020 and 2021. Following this Addendum, MEL 2007-01 is now valid until December 31, 2027.
MEL 2012-25, referred to as Qialivarteerpik (Sødalen), is 16 km2 in size and located approximately 12 km from MEL 2007-01 and separated by two MELs held by Longland Resources Ltd. (now owned by Conico Ltd. (Conico) - See Section 23) (Figure 3-2 and Table 3-2). A helicopter or boat is required to move between the two MELs. MEL 2012-25 was
originally granted by the MLSA in 2012 with an original expiry date of December 31, 2021. MEL 2012-25 contains the location of the Sødalen airstrip and field base camp, and is retained predominantly due to its rare flat topography. An Addendum to MEL 2012-25 was granted on January 5, 2021 by the MLSA regarding the change of the licence period and a temporary adjustment down to zero DKK for the yearly required exploration expenses for 2020 and 2021. Following this Addendum, MEL 2012-25 is now valid until December 31, 2026.
MEL 2021-10 was granted by the MLSA in 2021. It is approximately 754 km2 in size and is valid until December 31, 2026. MEL 2021-10 is subdivided into two separate blocks. Area 1 Aammaqqaagajik is located on the eastern shore and Area 2 Uuttortaavigajik is located on the western shore of the Kangerlussuaq Fjord, adjacent to MEL 2007-01 and MEL 2012-25 that comprise the Project (Figure 3-2 and Table 3-3). MEL 2021-10 is only accessible by boat or helicopter.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 3-2: Skaergaard Licence Areas
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Table 3-1: Corner Coordinates of Licence No. MEL 2007/01
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| Corner | Latitude | N/S | Longitude | E/W |
| Degrees | Minutes | Seconds | Degrees | Minutes | Seconds |
| A1 | 68 | 14 | 0 | N | 31 | 47 | 0 | W |
| A2 | 68 | 14 | 0 | N | 31 | 35 | 0 | W |
| A3 | 68 | 13 | 0 | N | 31 | 35 | 0 | W |
| A4 | 68 | 13 | 0 | N | 31 | 31 | 0 | W |
| A5 | 68 | 11 | 0 | N | 31 | 31 | 0 | W |
| A6 | 68 | 11 | 0 | N | 31 | 30 | 0 | W |
| A7 | 68 | 9 | 0 | N | 31 | 30 | 0 | W |
| A8 | 68 | 9 | 0 | N | 31 | 34 | 0 | W |
| A9 | 68 | 8 | 0 | N | 31 | 34 | 0 | W |
| A10 | 68 | 8 | 0 | N | 31 | 39 | 0 | W |
| A11 | 68 | 7 | 0 | N | 31 | 39 | 0 | W |
| A12 | 68 | 7 | 0 | N | 31 | 47 | 0 | W |
Table 3-2: Corner Coordinates of Licence No. MEL 2012/25
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| Corner | Latitude | N/S | Longitude | E/W |
| Degrees | Minutes | Seconds | Degrees | Minutes | Seconds |
| A1 | 68 | 13 | 0 | N | 31 | 25 | 0 | W |
| A2 | 68 | 13 | 0 | N | 31 | 22 | 0 | W |
| A3 | 68 | 12 | 0 | N | 31 | 22 | 0 | W |
| A4 | 68 | 12 | 0 | N | 31 | 19 | 0 | W |
| A5 | 68 | 10 | 0 | N | 31 | 19 | 0 | W |
| A6 | 68 | 10 | 0 | N | 31 | 24 | 0 | W |
| A7 | 68 | 12 | 0 | N | 31 | 24 | 0 | W |
| A8 | 68 | 12 | 0 | N | 31 | 25 | 0 | W |
| A9 | 68 | 13 | 0 | N | 31 | 25 | 0 | W |
Table 3-3: Corner Coordinates of Licence No. MEL 2021-10 Area 1 Aammaqqaagajik and area 2 Uuttortaavigajik
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| Corner | Latitude | N/S | Longitude | E/W |
| Degrees | Minutes | Seconds | Degrees | Minutes | Seconds |
| A1 | 68 | 27 | 0 | N | 32 | 13 | 0 | W |
| A2 | 68 | 27 | 0 | N | 31 | 24 | 0 | W |
| A3 | 68 | 17 | 0 | N | 31 | 24 | 0 | W |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| Corner | Latitude | N/S | Longitude | E/W |
| Degrees | Minutes | Seconds | Degrees | Minutes | Seconds |
| A4 | 68 | 17 | 0 | N | 31 | 26 | 0 | W |
| A5 | 68 | 16 | 0 | N | 31 | 26 | 0 | W |
| A6 | 68 | 16 | 0 | N | 31 | 29 | 0 | W |
| A7 | 68 | 15 | 0 | N | 31 | 29 | 0 | W |
| A8 | 68 | 15 | 0 | N | 32 | 0 | 0 | W |
| A9 | 68 | 16 | 0 | N | 32 | 0 | 0 | W |
| A10 | 68 | 16 | 0 | N | 32 | 4 | 0 | W |
| A11 | 68 | 18 | 0 | N | 32 | 4 | 0 | W |
| A12 | 68 | 18 | 0 | N | 32 | 6 | 0 | W |
| A13 | 68 | 20 | 0 | N | 32 | 6 | 0 | W |
| A14 | 68 | 20 | 0 | N | 32 | 8 | 0 | W |
| A15 | 68 | 22 | 0 | N | 32 | 8 | 0 | W |
| A16 | 68 | 22 | 0 | N | 32 | 13 | 0 | W |
| B1 | 68 | 22 | 0 | N | 32 | 10 | 0 | W |
| B2 | 68 | 22 | 0 | N | 32 | 28 | 0 | W |
| B3 | 68 | 21 | 58 | N | 32 | 10 | 0 | W |
| B4 | 68 | 17 | 0 | N | 32 | 10 | 0 | W |
| B5 | 68 | 17 | 0 | N | 32 | 6 | 0 | W |
| B6 | 68 | 11 | 0 | N | 32 | 6 | 0 | W |
| B7 | 68 | 13 | 0 | N | 32 | 15 | 0 | W |
| B8 | 68 | 19 | 0 | N | 32 | 15 | 0 | W |
| B9 | 68 | 19 | 0 | N | 32 | 22 | 0 | W |
| B10 | 68 | 16 | 0 | N | 32 | 22 | 0 | W |
| B11 | 68 | 16 | 0 | N | 32 | 20 | 0 | W |
| B12 | 68 | 13 | 0 | N | 32 | 20 | 0 | W |
| B13 | 68 | 12 | 0 | N | 32 | 15 | 2 | W |
| B14 | 68 | 10 | 0 | N | 32 | 6 | 2 | W |
| B15 | 68 | 11 | 0 | N | 32 | 28 | 0 | W |
| B16 | 68 | 22 | 0 | N | 32 | 28 | 0 | W |
The Skaergaard Project MELs are subject to the Standard Terms for Exploration Licences for Minerals (Excluding Hydrocarbons) in Greenland of November 16, 1998, as amended by Addendum No. 1 of September 10, 2010, Addendum No. 2 of June 25, 2013, Addendum No. 3 of July 1, 2014, including appendices 1–4 to this Addendum No. 3, and any subsequent amendments thereto.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
GRML controls a large ground position in Greenland and will be required to comply with the Greenlandic Mineral Resources Act, including meeting the annual minimum tenement expenditure obligations.
Obligations to retain MEL 2007-01 include an annual fee of DKK 25,000, adjusted each year on the basis of changes in the Danish Consumer Price Index from January 1992 to January of the actual year. The annual fee for MEL 2007-01 for 2026 was DKK 42,300. GRML expects the annual fee for MEL 2007-01 in 2027 to be in line with previous years.
In 2019, the exploration commitment to retain MEL 2012-25 was DKK 918,400, which consisted of a fixed amount in 2019 (Year 8) of DKK 656,000 and 16 km2 at DKK 1,640/km2. Platina fulfilled the exploration obligation for 2019 under MEL 2012-25 and incurred additional expenditures that could be applied in future years. The annual fee for MEL 2012-25 for 2026 was DKK 42,300. GRML expects the annual fee for MEL 2012-25 for 2027 to be in line with previous years.
With regard to MEL-2021-10, it is a newer licence; hence, the annual exploration obligation cost is still quite limited, given its 754 km2 licence area. The licence is up for renewal at the end of 2026, and a fee of DKK 26,900 will be imposed. The annual flat fee in 2026 is DKK 46,700. The 2027 annual flat fee will be similar, with only the Consumer Price Index adjustment.
3.3 Encumbrances
The Project is 80% owned by GRML, with 20% owned by Intrusion Precious Metals Corp. There are no back-in rights, payments or other agreements or encumbrances to which GRML is subject.
3.4 Royalties
There are no royalties on the Project except an NSR 2.5% royalty payable to the Government of Greenland from revenue received when a project reaches the production stage.
3.5 Required Permits and Status
The exploration and mining industry is conducted under a modern mining code (the Mineral Resources Act of 2009), and the Government of Greenland supports these activities. The Government of Greenland is proactively seeking to attract resource capital to develop a diversified economy, broaden the tax base, increase exports, and create high-quality local employment.
3.5.1 Mineral Exploration Licences
Mineral Exploration Licences (MEL) provide exclusive rights for the licensee to undertake mineral exploration activities for all commodities (excluding hydrocarbons) within the licence area. They must have a minimum area of 5.0 km2 and may consist of up to five separate subareas, with no more than 100.0 km between them.
MELs are granted for an initial period of five years, after which the licensee may apply for a new five-year period for the same area. At expiry of the second licence period (Years 6 to 10), the licensee may apply for further two-year periods for the same area, up to a maximum of 16 years (Years 11 to 12, 13 to 14, and 15 to 16).
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
A fixed fee per square kilometre must be paid to the Government of Greenland annually, and this increases with the age of the licence. Additionally, the licensee is committed to a minimum exploration expenditure per licence per year. This amount is defined by the government.
3.5.2 Exploration Activities
The Greenland MLSA is responsible for issuing MELs and for safety matters, including supervision and inspections. Licensees and other parties covered by the Mineral Resources Act communicate with the MLSA and receive all notifications, documents, and decisions from the MLSA. The Greenland Parliament Act No. 7 of December 7, 2009 on Mineral Resources and Mineral Resource activities (the Mineral Resources Act) came into force on January 1, 2010.
Amendments were made to the Mineral Resources Act in 2012 and 2014.
The Mineral Resources Act aims to ensure that activities under it are securely performed with regard to safety, health, the environment, resource exploitation, and social sustainability as well as performed according to acknowledged best international practices under similar conditions.
All exploration programs in Greenland must be approved by the MLSA before they can commence. Work program application forms must be submitted to the MLSA no later than May 1 in the year in which the exploration is planned.
3.5.3 Exploitation Licences
An MEL may be granted to an MEL holder who has discovered and delineated commercially exploitable Mineral Resources and whose Bankable Feasibility Study (BFS) must include a declaration of Mineral Reserves and has been approved by the Government of Greenland. The BFS must include an Environmental Impact Assessment (EIA), a Social Impact Assessment (SIA), and an Impact Benefit Agreement (IBA), with the scope of these studies being agreed between the licence holder and the Government of Greenland.
3.5.4 Surface Rights
In Greenland, there is no privately owned land; all rights to any use of land are administered by the Government of Greenland. The government can therefore grant rights to several legal activities in the same land area.
3.6 Other Significant Factors and Risks
SLR is not aware of any environmental liabilities on the property. GMRL has all the required permits to conduct the proposed work on the property. SLR is not aware of any other significant factors and risks that may affect access, title, or the right or ability to perform the proposed work program on the property.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
The Skaergaard property is located on the southeast coast of Greenland, on the eastern shore of the Kangerlussuaq Fjord and approximately 450 km west of Iceland. The Project is located in an isolated area of steep, glaciated, rugged mountain terrain. The Project area is considered pristine. There are no permanent inhabitants in the Project area, although it is used by seasonal hunters. There are no formally protected areas near the Project site, however, three significant areas for wildlife occur in or adjacent to the Project area, including important narwhal areas and seabird colonies.
The Project is an exploration stage property. Some historical environmental and socio-economic baseline work has been conducted for the Project, and provides a basic understanding of the area and potential environmental and socio-economic issues. Additional baseline studies will be required as the Project progresses towards applying for relevant authorizations.
Potential environmental and socio-economic issues and opportunities have been identified for the Project. These relate to the need for further baseline studies, potential impacts on sensitive biodiversity and important wildlife areas, potential dust generation which could lead to an increased albedo effect and enhanced melting of the underlying ice, the lack of geochemical information on ore and waste rock, water supply and management, potential impacts of tailings disposal, the potential for public objections to the Project, the need for mine closure planning, and potential opportunities for use of mine infrastructure after closure. The Government of Greenland also raised concerns about polar bear interactions, the protection of narwhales, and traditional land uses. These concerns will need to be considered and addressed as the Project progresses.
The Project will need to comply with Greenland legislation and European Union (EU) laws and directives. The Project will additionally need to consider relevant international obligations. The Project will need to conduct an EIA and SIA, along with supporting studies, to apply for authorization to exploit the mineral resource. An IBA and Mine Closure Plan will also be required as part of the authorization process.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
4.0 Accessibility, Climate, Local Resources, Infrastructure and Physiography
4.1 Accessibility
Skaergaard is located on the east coast of Greenland, approximately 450 km west of Iceland. The Project is accessed by charter airplane from Akureyri, Iceland, located in northern Iceland, approximately 250 km northeast of the Icelandic capital of Reykjavik. Direct flight time by a de Havilland Twin Otter is approximately 2.5 hours to Sødalen (SOD), a 600 m long gravel airstrip (UTM Zone 25W, 566939.00 m E, 7566845.00 m N) or (Latitude 68.209394°, Longitude - 31.379089°) that is maintained by the Government of Greenland and Norlandair, a charter airline based in Akureyri, Iceland. The aircraft is capable of carrying a cargo payload of approximately one tonne. The field camp is located adjacent to the airstrip.
Skaergaard is located approximately 12 km from Sødalen and, due to the steep terrain, a short helicopter flight is required to reach the property (Figure 4-1).
The Project is also accessible by coastal shipping and marine craft in the Mikis Fjord and other inlets/fjords when there is no sea ice, generally between July and early October. During other times of the year, daylight restrictions and extensive pack ice, which can extend more than halfway across the Demark Strait, inhibit navigation. Ship-based cargo is removed from the vessel and transported to the camp or drill site by helicopter.
There are no road or rail connections between the Project and Greenlandic communities.
4.2 Climate
Skaergaard is located in an Arctic climatic zone characterized by long, cold winters and short, cool summers. Winters are harsh and cold, with temperatures commonly ranging between - 10°C and -30°C, and with extreme lows of -45°C. In the summer period, from June to October, temperatures range between -4°C and +12°C.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 4-1: Aerial View of Sødalen Airstrip and Base Field Camp
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
The annual mean precipitation is approximately 80 cm, of which most falls as snow. The highest historical precipitation was measured in June, August, and September.
Water for summer exploration drilling is restricted to glacial runoff in small seasonal streams. The extreme winter climate and limited daylight limits exploration activities to the summer months since winter ice cover limits outcrop exposures as well as access to water for drilling operations, except for those areas near the sea. Fjords and coastal waters become ice-free in mid to late June, enabling exploration activities to operate up to late September/early October.
Due to its high latitude location, Skaergaard experiences a wide variance in daylight, varying from under four hours to over 22 hours per day, depending upon the season.
4.3 Local Resources
There are little to no local sources of supplies and materials in eastern Greenland, and all fuel, supplies, materials, and equipment used for exploration and drilling activities are typically transported via aircraft or ship (barge) from either Iceland (the closest destination) or western Greenland (Kangerlussuaq or Nuuk). The Project also has the distinct advantage of being serviced by a gravel airstrip at Sødalen, located within MEL 2012-25, which can accommodate Twin Otter aircraft flown in from Iceland (Norlandair) or western Greenland (Air Greenland). This is useful for cargo supply runs (up to 1,000 kg), crew changes, and emergency evacuations from the Project to and from Akureyri Airport, Iceland.
While there is a long history of mining in Greenland, it has been primarily focused on the western and southern coasts. Exploration and mining operations in Greenland must generally be organized from a base level with new equipment and infrastructure suited to remote locations.
Experienced labour is available from western Greenland, Iceland, or Europe, and general labour is available from the local communities of Illoqqortoormiut and Tasiilaq. GRML has reported that the Project enjoys the support of local communities.
4.4 Infrastructure
There is no significant infrastructure at the Project.
An exploration field base camp is located adjacent to the Sødalen airstrip (Figure 4-1). The Sødalen camp was built by Platina in 2007 to accommodate approximately 20 people, and originally consisted of 14 Weatherhaven tents and two permanent wooden outbuildings. Due to age, climate, and polar bear disturbances, the camp currently has only 10 usable Weatherhaven tents, which serve as accommodation, a sauna, and toilet facilities. One wooden outbuilding is used for equipment storage and core cutting. The other permanent wooden building is now owned by Norlandair and is utilized as a kitchen and office for the aircraft crews. Currently, all camp infrastructure is in various states of disrepair. A small quad bike (ATV) and trailer is used to transport materials around the camp. The Sødalen camp was last used by Platina during the 2011 field season and has been used by the adjacent operator, Conico, since 2017.
For the 2021 exploration campaign, MPM built geological field facilities on the western side of the Skaergaard deposit, south of the Forbindelses Glacier. Taking advantage of rates offered during the COVID-19 pandemic, day-to-day room and board were provided by a rented passenger vessel, anchored off the coast of the Skaergaard deposit to house geological and field staff, as well as drilling, helicopter, and logistics personnel on-site.
Fresh water is supplied by glacial melting. There are no power supplies except for small on-site portable generators.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
4.5 Physiography
The deposit is located in an area of steep terrain and glaciation (Figure 4-2 and Figure 4-3). Elevation varies between sea level to over 1,200 MASL.
The central portion of the Skaergaard Intrusion is partially obscured by a large central, east-west-trending glacier named Forbindelses Glacier, while a portion of the western margin is submerged beneath Uttental Sund. Overall, the Project area is approximately 40% covered with glaciers. Sødalen and Vandfaldsdalen are the only major ice-free, low-lying areas.
Large variations in surface run-off occur, with extremes in early summer. There are also three small freshwater lakes in the area, each covering approximately 1.0 km2.
Vegetation on the property is limited, consisting mainly of mosses, low, hardy shrubs, and seasonal flowering plants.
Terrestrial wildlife is limited to small rodents, arctic foxes, and occasional polar bears. Birds are generally seabirds, as well as small numbers of rock ptarmigan. Aquatic biodiversity present in the coastal areas surrounding Skaergaard includes various species of fish, seals, walrus, and whales. Narwhal breeding grounds are protected in the Kangerlussuaq Fjord to the west of the Project; however, the Miki Fjord, which is the current access to the Project, is not protected.
Despite its Arctic location, the property is only locally affected by shallow permafrost. The geothermal gradient is approximately 25°C per 1,000 m. Most of the deposit area is not covered by soil. Due to the limited vegetation and soil, the rock outcrop exposure on the property is approximately 80%, with the remaining 20% covered by ice (Forbindelses Glacier).
Locations for any envisioned mining operations, including plant sites, camp locations, port facilities, and tailings disposal facilities, would need to be assessed. Any potential mining operations would likely require fly-in and fly-out operations with an all-weather paved airstrip.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 4-2: Photograph of Miki Fjord and Skaergaard Fuel Storage
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 4-3: Topography of Licence Area
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
5.0 History
5.1 Prior Ownership and Exploration History
The following history is taken from Per (2015), Douglas (2018 to 2020), and SLR (2022).
•The Skaergaard Intrusion was discovered by L. R. Wager in 1930, and continued exploration in 1932 and 1935 to 1936. In 1953, the British East Greenland Geological Expedition visited the Skaergaard Intrusion and other layered gabbros in the area.
•The 1966 British East Greenland Geological Expedition drilled much of the unexposed Hidden Zone gabbros in the floor of the Skaergaard Intrusion. In 1970 to 1971 prospectors from the Northern Mining Company (Nordisk Mineselskab A/S) worked in the area.
•A number of scientific expeditions to study the Skaergaard Intrusion have been undertaken since the early 1970s to the present.
•Platinova Resources Ltd. (Platinova) worked in the area from 1986 to 1991 and drilled greater than 16,000 m of diamond drill hole (DDH) core. Platinova and Corona Corporation (Corona) formed a joint venture (Platinova Corona JV) in 1988.
•Platinova found anomalously high concentrations of gold in stream sediments and whole rock samples from the Skaergaard Intrusion. Subsequent exploration by channel sampling, drilling, and assaying identified a stratabound zone rich in palladium and gold in the upper 100 m of the Middle Zone (MZ) in the Layered Series of the
intrusion. This zone, subsequently known as the Platinova Reef, can be traced in outcrop and underground across two-thirds of the intrusion's area.
•Gryphon Metals Corporation (Gryphon) was granted a licence over Skaergaard in 2000.
•Licence transferred to Skaergaard Minerals Corporation (SMC) in 2003.
•Platina took over the concession in 2007 and drilled more than 12,400 m of core between 2007 and 2011.
•A scoping study was conducted in 2008 and updated in 2019.
•From 2017 to 2019, Platina carried out small field programs in Greenland, laboratory test work, and a scoping study (Douglas 2018 to 2020). All fieldwork and studies were conducted by external consultants.
•In 2020, MPM acquired Skaergaard from Platina and completed additional drilling in August and September 2021.
•In 2022 MPM delisted from the NEO Exchange.
•In 2024 MPM change name to Intrusion Precious Metals Corp. (IPMC)
•In Greenland Mines Corp., a privately held Delaware, U.S., corporation, acquired an 80% interest in the Project from IPMC, and was in turn acquired by Klotho through a merger in March 2026 whereby it got listed on NASDAQ under the name Greenland Mines Ltd. and the ticker symbol GRML.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Table 5-1 presents a summary of the most relevant historical Skaergaard ownership and historical exploration activities.
Table 5-1: Summary of Historical Project Ownership and Exploration – 1986 to 2026
| | | | | | | | |
| Year(s) | Ownership | Major Activities |
1986 to 1988 | Platinova Resources Ltd. | Prospecting realizes anomalous levels of precious metals. First exploration license granted. Delineated the Gold Zone as part of the stratigraphy (‘Triple Group’). Chip sampling. Trench channel sampling. Winkie drill holes (8). Form joint venture with Corona (1988). |
| 1989 | Platinova Resources Ltd. Corona Corporation. | Palladium Zone discovered beneath the Gold Zone. 9 DDH completed. |
| 1990 | Platinova Resources Ltd. Corona Corporation | 18 DDH completed. Limited resource estimation compiled by Watts, Griffis and McOuat (WGM). Platinova purchase Corona interest. Bulk sample (1 t) collected for metallurgical testing. |
1991 to 1996 | Platinova Resources Ltd. | Preliminary metallurgical studies (funded by Pegasus Gold Corporation). No significant field activities due to relatively low grades and prevailing low metal prices. |
| | | | | | | | |
2000 to 2003 | Gryphon Metals Corp. | Gryphon granted licence in 2000. Licence transferred to Skaergaard Minerals Corporation in 2003. Trench channel sampling. Winkie drill hole (1). Bulk samples (3) collected for metallurgical testing. |
| 2004 | Skaergaard Minerals Corp. | 8 DDH completed. |
| 2005 | Inferred Mineral Resource estimated by Roscoe Postle Associates Inc. (RPA), reported in a NI 43-101 Technical Report |
| 2006 | SMC licence lapsed. Licence applied for by Platina. |
| 2007 | Platina Resources Ltd. | Licence acquired by Platina. |
| 2008 | Platina commissioned SRK Consulting (Cardiff) to complete a Scoping Study. Scoping study confirms economic potential and recommends progressing to Pre-Feasibility Study. In commencement of the Pre-Feasibility Study maiden Greenlandic field season undertaken. 5 DDH completed. New exploration camp established. Baseline environmental studies initiated. Permanent weather station and tidal gauge established at Miki Fjord. Digital hydrometric stations positioned in the Vandfaldsdalen and Sødalen Valleys. |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
| | | | | | | | |
| Year(s) | Ownership | Major Activities |
| | Environmental and ecological surveys conducted at Vandfaldsdalen Valley, one of the proposed tailings sites. |
| 2010 | 10 DDH completed. |
| 2011 | 11 DDH completed. |
| 2020 | Major Precious Metals Ltd. (MPM) | Acquired the Project (license MEL 2007-01 and MEL 2012-25) from Platina. Resampled the 2011 diamond drill program in half core samples. |
| 2021 | In addition to ownership of two MELs, was granted a third, adjacent MEL (license MEL 2021-10). Completed 32 DDH for 7,787 m and four channels for a total length of 240.76 m. |
| 2022 | MPM delisted from the NEO Exchange. |
| 2024 | IPMC | MPM change name to Intrusion Precious Metals Corp. (IPMC) |
| 2026 | GRML | Greenland Mines Corp., a privately held Delaware, U.S., corporation, acquired an 80% interest in the Project from IPMC, and was in turn acquired by Klotho through a merger in March 2026 whereby it got listed on NASDAQ under the name Greenland Mines Ltd. and the ticker symbol GRML. |
5.1.1 Surface Channel Sampling
Twenty-seven surface channels, totalling 1,193.45 m, were completed by Platinova between 1988 and 2003. A total of 824 samples were collected from these traverses using diamond saw channels.
SMC conducted surface sampling over outcrops of the Triple Group along the northern boundary of the deposit in 2003. Channels were cut primarily by diamond saw, with individual samples measuring 0.1 m to 5.9 m in length. Channel locations were picked up by surface surveys and tied into the property grid.
Previous consultants have raised concerns about the accuracy of the channel sample locations. The SLR QP has performed a two-stage ‘best fit’ transform on the historical channels, which aligns fairly well with topography, but the 2021 fieldwork that surveyed the historical channels still shows discrepancies in location, orientation, and length. In the SLR QP’s opinion, the historical channel samples can only support Inferred Mineral Resources. The area north of the Forbindelses Glacier is mainly supported by 2021 drilling, while the historical channels account for only a minor part of the MRE.
5.1.2 Geological Mapping
The Skaergaard Intrusion has been mapped by several geoscientists on academic missions since its discovery in the 1930s. One of the most comprehensive geological maps is a 1:20,000-scale map by Professor Alexander R. McBirney, PhD, of the University of Oregon, published in 1989. The geological model for the MRE relies heavily on McBirney’s work and that of Nielsen (2006).
5.1.3 Geophysical Surveys
Geophysical surveying has been limited on the Project. In 1971, airborne magnetic and gravity surveys were conducted over the Skaergaard Intrusion, with only partial and erratic coverage.
A seismic survey was conducted in 1990 by Williams Geophysics over portions of the Forbindelses Glacier. The glacier thickness was determined, and the results were used to optimize drill-site selection. Subsequent drilling at three sites confirmed the results were very accurate; however, since 1990, the glacier has retreated and shrunk in size.
5.1.4 Metallurgical Test Work
The Skaergaard deposit has been the subject of several metallurgical test work programs between 1988 and 2009. Investigations into potential treatment routes and the selection and optimization of saleable products are still at a relatively early stage, although results are encouraging for gold extraction. GRML plans to review this test work and, as required, develop further test work programs.
5.1.5 Drilling
Drilling was conducted by various companies from 1989 to 2021, with the most recent drill program completed by MPM in the summer of 2021. For more details on drilling, see Section 7.2.
5.2 Past Production
There has been no production from the property up to the effective date of this Technical Report.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
6.0 Geological Setting, Mineralization, and Deposit
The Skaergaard Intrusion is an example of a layered mafic igneous complex with stratiform platinum group element-gold (PGE-Au) and iron-titanium (Fe-Ti) oxide mineralization. The Layered Series is subdivided petrographically into the Upper, Middle, Lower, and Hidden Zones.
Within the upper 90 m of the MZ is the Triple Group, which is a rhythmically banded plagioclase-augite-titanomagnetite-ilmenite cumulate consisting of interbanded leucocratic and melanocratic gabbro layers. All known PGE mineralization is associated with the Triple Group, which thickens towards the centre of the intrusion and shows a greater concentration of Fe-Ti oxide layers towards the margins.
The mineralization is strongly layered, with seven horizons recognized, numbered as H0 at the base, to H6 at the top. The majority of the gold is located in the H5 and H3 gold-rich horizons, which typically consist of approximately 2.5 m to 3 m thick mineralized material. The PGE-Au occur as complex alloys of mixed precious metals with base metals (iron and copper) Most of the palladium resides in the 4 m thick basal H0 horizon. The QP notes that all of the horizons contain Pd, Au, and Pt. The H0 is Pd-Pt dominant, while the layers above contain more gold and less PGEs. Further, the thicknesses of the horizons are described as a function of the 1.43 g/t palladium equivalent (PdEq) cut-off. The assigned horizons may be thicker or thinner as the cut-off is lowered or raised, respectively.
6.1 Regional Geology
The mineralization is hosted in the Skaergaard Intrusion, which is part of the Palaeogene Magmatic Province, a series of gabbro and syenite intrusions which formed approximately 55 million years ago, during the opening of the Atlantic Ocean (Figure 6-1). The Skaergaard Intrusion lies between Archean basement gneisses and amphibolites, and a succession of late Cretaceous sediments and Paleocene–Eocene flood basalts.
A post-intrusion monoclinal folding event caused a regional eastward rotation of fault blocks, dipping 15° to 20° to the south, and an eastward dip of previously vertical dykes. The development of the monocline structure was accommodated by Tertiary normal faulting at various scales, ranging from slips along dyke margins to larger fault zones. Some faults have been inferred and/or mapped in the Skaergaard Intrusion, but are generally far apart and with minor offsets (McBirney 1989). Most of these faults are parallel to the monocline's hinge. A mafic sheeted dyke swarm runs parallel to the coastline between latitudes 66° and 70°.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 6-1: Regional Geology
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
6.2 Local Geology
The Skaergaard Intrusion is exposed over an area of approximately 70 km2 with dimensions of approximately 7.5 km (east-west) and 11 km (north-south) and has a tabular, sill-like geometry (Figure 6-2 and Figure 6-3). The geometry was determined by faults that intersect the intrusion layers at approximately 90°. Its depth extent is estimated at four kilometres.
The Skaergaard Intrusion is subdivided into the following groups (Figure 6-2 and Figure 6-3):
•The Marginal Border Series, several hundred metres thick, the product of crystallization along the walls of the magma chamber.
•The Upper Border Group, approximately 900 m thick, the product of downward crystal growth from the roof.
•The Layered Series, approximately 2,500 m thick, which accumulated upwards.
The Layered Series is further subdivided petrographically into the Upper, Middle, Lower, and Hidden Zones. The lowest zone, called the Hidden Zone, is not exposed and has not been intersected by drilling. Its presence was, however, interpreted from 1971 gravimetric surveying.
The Lower Zone (LZ) is subdivided into three subzones (Lza, LZb, and LZc) based on varying content of plagioclase, olivine, clinopyroxene, magnetite and ilmenite. Lza has cumulus plagioclase and olivine. LZb has plagioclase and olivine plus clinopyroxene and LZc has plagioclase, olivine and clinopyroxene plus magnetite and ilmenite.
The MZ is petrographically very similar to the LZ, although it contains low-Ca pyroxene and olivine is generally absent.
The Upper Zone (UZ) is defined by the presence of olivine as a cumulus phase and is otherwise petrographically similar to the LZ and MZ.
The two crystallization fronts of the Upper Border Group and the Layered Series are separated by the Sandwich Horizon, which formed from volatile-rich magma enriched in incompatible elements during fractionation.
Multiple generations of cross-cutting mafic and granophyric dykes intrude Skaergaard in increasing concentrations to the south, estimated percentages increase from 4.5% in the north to 11.4% in the southern part of the deposit. The granophyric dykes are cut by the mafic dykes. The dykes post-date mineralization. The dykes generally appear as recessive topographic features.
Anorthosite blocks (Upper Border Series), which fell from the roof during crystallization, are common in the lower and middle parts of the MZ. Although not considered to be as significant as the dykes, if present, the anorthosite blocks have the potential to both dilute grade and disrupt the lateral continuity of the stratiform reefs.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure6-2: Local Geology
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 6-3: Simplified Structural Sections of the Skaergaard Intrusion (Nielsen 2006)
6.3 Property Geology
Mineralization at Skaergaard is hosted by the Triple Group, which forms the upper 90 m of the MZ (Figure 6-4 and Figure 6-5). The Triple Group is a rhythmically banded plagioclase-augite-titanomagnetite-ilmenite cumulate consisting of interbanded leucocratic (L0 through L3) and melanocratic (M0 through M3) gabbro layers. The leucocratic-melanocratic pairs are interbedded with units of meso-gabbro of variable thickness. Each macro rhythmic group is 15 m to 20 m thick.
The Triple Group thickens towards the centre of the intrusion and shows a greater concentration of Fe-Ti oxide layers towards the margins. All known PGE mineralization is associated with the Triple Group in seven identified horizons, H0 to H6. The Triple Group is known from outcrop and drilling and has a southerly dip of approximately 20°.
Andersen et al (1998) named the units of the Triple Group from TG-0 at the base to TG-3 at the top. TG-0 is interpreted to be a transitional unit to the Triple Group and is significant because its leucocratic layer hosts the lowermost mineralized layer.
As described by Andersen et al. (1998), rocks from the Triple Group are medium-grained gabbros with weakly developed lamination defined by the preferred orientation of lath-shaped plagioclase grains. The rocks consist of variable amounts of plagioclase, ilmenite, augite, titanomagnetite (now oxidized and exsolved), minor inverted pigeonite, and small amounts of copper-iron sulfides carrying grains of gold and PGE-bearing minerals. Olivine occurs sporadically in small amounts in the meso- and melanocratic layers. Trace interstitial phases include quartz, apatite, and biotite.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 6-4: Stratigraphy of the Skaergaard Intrusion and Triple Group
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 6-5: Simplified Structural Sections of the Skaergaard Intrusion (Nielsen 2006)
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
6.4 Mineralization
PGE and Au are hosted in the Triple Group, in the upper 90 m of the MZ of the Skaergaard Intrusion. The mineralization is strongly layered, with seven horizons recognized, numbered as H0 at the base, to H6 at the top. The horizons are collectively known as the Platinova Reefs.
PGE and Au are mixed with copper and iron to form a suite of complex alloys. The precious metal alloys are found in association with copper sulfides, silicates, or ilmenite. Precious metal alloys generally have particle sizes of less than 100 µm.
The dominant precious metal minerals are (Cu, Fe)(Au, Pd, Pt)-alloys. Other less abundant minerals include other metallic alloys (such as Cu3(Au, Pd, Pt)-alloys), palladium tellurides (keithconnite (Pd3-x(Te, As)), kotulskite (Pd(Te, Bi)) and melonite ((Te, Sb)2(Ni, Pd, Cu, Fe)) and palladium sulfides such as vysotskite ((Pd, Ni)S) and vasilite ((Pd, Cu)16S7). Palladium arsenides occur near the margins of the Skaergaard Intrusion.
Copper represents only a minor component of the deposit, with concentrations averaging approximately 0.08%, and is not included in the MRE. The main copper minerals associated with mineralization are bornite, digenite, and chalcopyrite. The textural relationships of mineralization suggest a close genetic association between the sulfides and PGE-Au, an association which is confirmed by whole-rock compositional data (Anderson et al. 1998). Lateral and vertical zonation of platinum, palladium, and gold has been demonstrated with platinum enrichment in the lower layer in the central part of the Skaergaard Intrusion, palladium dominating the central section, and gold towards the margins.
The Triple Group also contains elevated levels of both TiO2 and Fe2O3, reflecting the presence of ilmenite and low titanium magnetite and titanomagnetite. Mineralized horizons contain TiO2 levels from 5.5% to 6.5% while Fe2O3 content ranges from 17% to 20%. The magnetites from the Triple Group are also marked by enhanced levels of vanadium (approximately 600 ppm to 1,000 ppm V in mineralized horizons) and gallium (approximately 20 ppm to 25 ppm Ga in mineralized horizons).
There are no macroscopic features that distinguish the mineralized gabbro from the non-mineralized gabbro.
Previous work has separated the mineralization into a basal palladium-rich zone and an upper gold-rich zone, with a variably but weakly mineralized layer in between. The thickness of the entire mineralized package is approximately 40 m to 45 m.
6.5 Deposit Types
The Skaergaard Intrusion is an example of a layered mafic igneous complex with stratiform PGE-Au and Fe-Ti oxide mineralization.
The Skaergaard mineralization is genetically related to processes of magmatic differentiation and crystallization. It is thought to have formed by sulfide saturation within a fractionating magma under closed-system conditions. The PGE, gold, and copper were scavenged from the evolved magma by the sulfide droplets due to their chalcophile nature and crystallized into small droplets of Cu-Fe sulfides and PGE- and Au-rich alloys.
The metals are located in distinct stratigraphic intervals of the Triple Group in the upper 100 m of the MZ of the Skaergaard Intrusion. The mineralized layered gabbros are referred to as the Platinova Reef, which is a strata-bound mineralized zone dominated by palladium and gold.
The Platinova Reef appears to have formed in response to silicate-sulfide liquid immiscibility in the basaltic magma. In contrast to classic PGE reefs, however, there is no evidence of magma replenishment and/or magma mixing associated with the Platinova Reef. Instead, it appears that the immiscibility was reached entirely through magmatic differentiation by fractional crystallization. A simple model of PGE fractionation by silicate-sulfide liquid immiscibility, however, fails to explain the reef's repetitive nature and the separation of palladium, platinum, gold, and copper. Repeated sulfur saturation in intercumulus melt concentrations followed by bulk magma sulfur saturation is offered as an explanation for the layered nature of the mineralization and the separation of palladium, platinum, gold, and copper (WAI 2013).h
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
7.0 Exploration
7.1 Exploration
MPM obtained 0.5 m resolution satellite topography and imagery in 2020 for use in the Mineral Resource modelling and estimation.
In 2020, MPM resampled the 2011 diamond drill program in half-core samples to ensure that samples from that year were of sufficient quality. SLR incorporated the Pd, Au, and Pt results from the resampling program into the 2022 MRE.
The reader is directed to Section 5, History, for a summary of exploration by previous owners. Section 7.2 Drilling covers channel sampling and drilling programs conducted at the Project.
Greenland Mines Corp., a privately held Delaware corporation, acquired an 80% interest in the Project from MPM on February 25, 2026. On March 3, 2026, Klotho announced a definitive merger agreement with Greenland Mines Corp., which closed on March 4, 2026, and the combined entity subsequently changed its name to Greenland Mines Ltd. As of the date of this TRS, GRML has not carried out an exploration program on the Project.
7.1.1 Exploration Potential
The Skaergaard Intrusion has been studied by historical operators and academia, and there is a high confidence in the overall geological and structural interpretation.
The QP notes that exploration potential could extend to the limits of the mineralized Triple Group horizons inside the boundaries of the Skaergaard Intrusion, which is likely also constrained by the Marginal Border Series rock at the margins of the intrusive body. Further drilling could increase the Inferred Mineral Resources outboard of current drilling at depth. Inferred Mineral Resources could be upgraded to Indicated Mineral Resource material, further defining high- and low-grade areas of mineralization, and delineating barren dyke material more accurately. GRML should also consider assaying unsampled intervals from the Triple Group in the extant core located in various places. Drilling in the central to southeast part of the deposit could define further Inferred and Indicated Mineral Resources, though the terrain is rugged.
Accurate bathymetry for both the glacier and ocean could potentially define additional exploration targets.
Regarding the potential pilot open pit at the northeastern plateau area (north of the Forbindelses Glacier), SLR notes that the mineralized horizon H0 starts at 25 m vertical depth in hole MPD013 and 35 m vertical depth in hole MPD012. In the northwestern part of the Project, MDP002 intercepted H5 at 40 m vertical depth. To better understand the open pit potential in these areas, the QP recommends that the host rock above H0 should be evaluated for potential metal credits as part of the future Initial Assessment (IA) work.
In the SLR QP’s opinion, there is excellent potential at Skaergaard to confirm the continuity, grade, and thickness, and extend the known mineralized zones within the favourable geological environment on the Project. Further exploration and evaluation activities are warranted.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
7.1.2 Survey Grids and Digital Terrain Maps
7.1.2.1 Survey Grids
The UTM grid system is WGS84, Zone 25N.
HNIT HF, an Icelandic engineering firm based in Reykjavik, completed a cadastral survey of all 1989 and 1990 drill hole locations and several 1988 sites. The survey was conducted during two visits to the Project area in September 1990. Seven survey monuments were established in the Skaergaard area, referenced to the Project grid and tied into two benchmarks at Sødalen.
In July 2011, following the completion of the Platina drill programs, Asiaq Greenland Survey (Asiaq) established fixed survey reference points at Skaergaard, Miki Fjord, and Sødalen to control their surveys. The Asiaq surveys were conducted using real-time kinematic (RTK) GPS equipment. Expected accuracy is ±50 mm for easting, northing, and elevation coordinates.
In August and September 2021, Asiaq surveyed all drill hole collars and channels completed in the 2021 field season. Asiaq also established a new fixed point on Kraemer Island, which can be used for future survey work.
7.1.2.2 Digital Terrain Maps
For 2021, MPM procured 0.5 m resolution topography data and Landsat imagery, covering the Skaergaard intrusion and adjacent area around Miki’s Fjord, from PhotoSat. The relative horizontal accuracy of PhotoSat’s precision orthophotos is generally better than 50 cm over distances of 10 km. The 50 cm satellite survey and 50 cm precision orthophoto were produced using PhotoSat’s proprietary Geophysical Satellite Processing system. To assess the accuracy of this project,
PhotoSat compared the PhotoSat satellite survey to client-supplied ground control points and a two-metre topographic surface. Using this methodology, analysis of Light Detection and Ranging (LiDAR) at 57 surveyed ground control points showed that the elevation root mean square error (RMSE) of the PhotoSat survey is 15 cm. Approximately 90% of the survey elevations are within 25 cm of the LiDAR control points.
The Landsat topography data was filtered in Vulcan software for use in the MRE. Drill collars were reviewed relative to the topographic surface, and several collars were corrected by MPM as a result of this review. In some cases, it appears that different vertical references have been used for different datasets. Current collars and topographic surface reference the Greenland Vertical Reference 2016, whereas historical collars reference the Greenland Vertical Reference 2000. DDH D-04-32 was surveyed in 2011 (Greenland Vertical Reference 2000) and in 2021 (Greenland Vertical Reference 2016), and there is a 1.6 m difference in elevation between the two surveys, with the more recent survey closer to the topographic surface, which uses the same vertical reference.
The distance between topographic surface and current collar elevations is generally between 5 m and 10 m above the topographic surface, but is often ± 5 m (30% of holes). The distance between topographic surface and historical collar elevations is generally within ± 5 m (67% of collars) but can be up to ± 35 m in holes with a D* prefix.
In addition to collar survey GIS datum discrepancies, differences in elevation between current ‘best’ collar positions and the PhotoSat topographic surface could be confounded by changes in the physical surface in the 10 years between surveys, including glacial ablation, changes in other ice and snow cover, and mass wasting/erosion through freeze and thaw cycles.
7.1.3 Historical Channel Sample Locations
The location of the historical channels was considered by previous Competent Persons (WAI, 2013) to be subject to significant error, and consequently, these samples were not recommended for use in mineral resource estimation.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
In 2021, SLR leveraged the new PhotoSat topography and imagery to reposition the channel samples north of the Forbindelses Glacier. SLR digitized points on the centres of the leucocratic gabbros where they were discernible on the PhotoSat imagery, and draped on PhotoSat topography resampled to two-metre resolution, in Leapfrog. SLR then digitized points to represent the expected positions of the mineralized horizons, built mineralized horizons without the channel sample information, then exported the extrapolated horizon solids to Vulcan software, repositioned the channel samples to the expected mineralized horizons relative to the leucocratic gabbro positions, reimported the new channel collars, included the samples in the mineralization models, and checked the result.
In the QP’s opinion, the historical channel sample information, in the context of the updated geology and mineralization modelling, is of sufficient quality to classify some material in the area as Inferred Mineral Resource, though positional accuracy is still not of sufficient quality to upgrade material north of the Forbindelses Glacier to Indicated Mineral Resource. SLR observes that most historical channel sampling was conducted using high-quality cuts with adequate quality assurance and quality control (QA/QC).
The SLR QP recommended that MPM attempt to locate the exact positions of the channel samples during the 2021 field season, possibly with the aid of a drone. MPM geological staff surveyed ten historical channels with a handheld global positioning system (GPS) during the 2021 field season. The QP reviewed the start and end positions of the channel samples and determined that the historical positions, orientations, and lengths of the samples were not generally reconcilable with those recorded in the Mineral Resource database. Therefore, the QP is of the opinion that the historical channels do not support any classification higher than Inferred Mineral Resource.
7.1.4 Current Channel Sample Locations
MPM laid out and cut channels on four main lines to locate and assay the mineralized horizons at the western margin of the deposit. The channel planning was understood to be less accurate than the drill planning, given changes in orientation and thickness in the less defined and unmodelled Marginal Border Series of the deposit. As such, samples which targeted and missed mineralized horizons would also help to position the modelled interpretation.
Asiaq surveyed four channels, each comprising 114 short subchannels. Each channel was surveyed at the start and end point, and in the middle if the channel was longer than four metres or had a significant bend.
The approach by Asiaq contrasted with the channel data collected by the field geologists, which consisted of 67 individual channels represented by a handheld GPS survey of the start point, followed by azimuth and dip data to reflect changes in trajectory and elevation. Gaps or breaks in the channels were simply represented by gaps in the sample intervals.
After reconciling the two data types using photographs of the channels, SLR is of the opinion that the Asiaq surveys better reflect the channels than the data recorded by field geologists. The channels are therefore represented in the data by using the Asiaq start, mid, and end point surveys drill holes as follows:
•An accurate ‘collar’ position for the channel was created using the start point.
•The mid and end points were used to create a survey file containing azimuth and dip data to reflect changes in the channel trajectory.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
•The drill hole depth was taken as the sum of the sample intervals' assay data or the endpoint, whichever was longer.
In general, the channels created in this manner are identical to the Asiaq-surveyed positions, except for slight differences in length. In very few cases, there are differences between the final and surveyed positions, particularly where it was necessary to keep a single channel rather than the multiple channels surveyed or where the channel is particularly complex.
7.2 Drilling
Since 1989, a total of 93 diamond drill holes (DDH) for a total length of 42,050 m and 30 channel samples for a total of 1,409 m have been completed at the Project by previous owners. The most recent drilling campaign was carried out by MPM in the summer of 2021.
A summary of drilling at the Project is provided in Table 7-1 and a drill hole location plan is provided in .
Table 7-1: Project Diamond Drilling Summary
| | | | | | | | | | | | | | |
| Year | Company | No. of Holes | No. of Wedges | Total Metres Drilled |
| 1989 | Platinova | 9 | 2 | 2,673.10 |
| 1990 | Platinova | 18 | 5 | 13,662.04 |
| 2004 | SMC | 8 | - | 5,495.00 |
| 2008 | Platina | 5 | - | 2,365.40 |
| 2010 | Platina | 10 | - | 6,920.70 |
| 2011 | Platina | 11 | - | 3,147.00 |
| 2021 | MPM | 32 | - | 7,787.20 |
| Total | | 93 | 7 | 42,050.44 |
Due to the remote location, drill core from the Skaergaard has been shipped to Toronto and Vancouver in Canada, to Iceland, to Copenhagen, to Kangerlussuaq Airport in Greenland, and to Robina on the Gold Coast of Australia. SLR recommends that GRML centralize the drill core to one secured location to achieve a complete and coherent physical database for the deposit.
The following description of the drilling at the Project is largely taken from SLR (2022), subdivided into pre-2011 drilling and more recent 2021 drilling.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 7-1: Drilling and Channel Sampling
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
7.2.1 Pre-2011 Drilling
7.2.1.1 Summary
Pre-2011 diamond drilling at the Project comprises a total of 61 drill holes for a total length of 34,263 m, as summarized in Table 7-1 and presented in a plan view in Figure 7-1. Most drill holes range from vertical to dipping approximately 70° north, approximately perpendicular to the nominal dip of the mineralized horizons. A list of all the historical drill holes and H0-H5 horizon intercepts is provided in Table 7-2 and Table 7-3, respectively.
Table 7-2: Drill Hole Collar Locations, 1989-2011
| | | | | | | | | | | | | | | | | | | | |
| Hole ID | East (m) | North (m) | Elevation (m) | Total Depth (m) | Azimuth (°) | Dip (°) |
| D-04-28 | 556,260.0 | 7,562,695.0 | 269 | 212 | 0 | 90 |
| D-04-28A | 556,260.0 | 7,562,703.0 | 269 | 556 | 0 | 90 |
| D-04-29 | 556,553.0 | 7,562,580.0 | 283 | 573 | 0 | 90 |
| D-04-30 | 553,559.7 | 7,559,669.8 | 0.72 | 1,198.00 | 0 | 90 |
| D-04-31 | 553,944.0 | 7,560,279.0 | 65 | 1,320.00 | 110 | 80 |
| D-04-32 | 553,340.6 | 7,561,840.6 | 28.01 | 661 | 315 | 70 |
| D-04-33 | 555,617.0 | 7,562,781.0 | 228 | 476 | 0 | 90 |
| D-04-34 | 557,663.0 | 7,562,550.0 | 354 | 499 | 0 | 90 |
| D-89-01 | 554,090.0 | 7,562,691.0 | 26.37 | 230.2 | 0 | 90 |
| D-89-02 | 554,090.0 | 7,562,690.0 | 26.31 | 247.8 | 0 | 90 |
| D-89-03 | 553,096.5 | 7,562,179.6 | 17.91 | 296.9 | 325 | 80 |
| D-89-04 | 553,096.7 | 7,562,179.3 | 17.92 | 318.5 | 0 | 90 |
| D-89-05 | 555,858.3 | 7,563,735.8 | 304.01 | 215.2 | 0 | 80 |
| D-89-06 | 555,858.3 | 7,563,735.8 | 304.01 | 215.2 | 0 | 70 |
| D-89-07 | 553,951.5 | 7,563,037.7 | 5.23 | 115.2 | 30 | 70 |
| D-89-08 | 553,951.3 | 7,563,037.5 | 5.24 | 117.35 | 30 | 80 |
| D-89-09 | 553,549.6 | 7,561,781.2 | 53.99 | 495.6 | 345 | 70 |
| D-89-09A | 553,549.6 | 7,561,781.2 | 53.99 | 495.6 | 345 | 70 |
| D-89-09B | 553,549.6 | 7,561,781.2 | 54 | 495.6 | 345 | 70 |
| D-90-10 | 552,374.0 | 7,560,758.0 | 1.67 | 535.35 | 300 | 70 |
| D-90-11 | 553,351.8 | 7,560,969.4 | 0.22 | 718.1 | 340 | 80 |
| D-90-12 | 552,481.1 | 7,560,011.8 | 1.37 | 640.08 | 330 | 70 |
| D-90-13 | 553,132.2 | 7,561,470.4 | 3.87 | 523 | 340 | 70 |
| D-90-14 | 552,192.4 | 7,561,526.7 | 1.62 | 285.3 | 325 | 70 |
| D-90-15 | 552,419.1 | 7,561,352.1 | 3.32 | 349.7 | 330 | 70 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
| | | | | | | | | | | | | | | | | | | | |
| Hole ID | East (m) | North (m) | Elevation (m) | Total Depth (m) | Azimuth (°) | Dip (°) |
| D-90-16 | 555,968.0 | 7,562,817.0 | 254.59 | 476.05 | 0 | 90 |
| D-90-16A | 555,968.0 | 7,562,817.0 | 254.59 | 456.7 | 360 | 90 |
| D-90-17 | 552,629.5 | 7,561,006.1 | 1.88 | 537.97 | 340 | 80 |
| D-90-17A | 552,629.5 | 7,561,006.1 | 1.88 | 537.97 | 340 | 80 |
| D-90-18 | 553,402.6 | 7,560,043.7 | 1.32 | 1,025.65 | 320 | 70 |
| D-90-19 | 556,878.0 | 7,562,463.0 | 307.74 | 623.63 | 0 | 90 |
| D-90-20 | 554,073.0 | 7,560,643.0 | 144.5 | 1,013.46 | 300 | 70 |
| D-90-21 | 557,884.0 | 7,561,596.0 | 577.16 | 943.66 | 33 | 80 |
| D-90-22 | 554,604.0 | 7,561,147.0 | 305.82 | 1,052.47 | 340 | 70 |
| D-90-23 | 557,884.0 | 7,561,597.0 | 577.13 | 843.1 | 35 | 70 |
| D-90-23A | 557,884.0 | 7,561,597.0 | 577.13 | 841.87 | 35 | 70 |
| D-90-24 | 555,066.0 | 7,561,739.0 | 501.76 | 1,071.67 | 0 | 70 |
| D-90-25 | 554,715.0 | 7,562,621.0 | 141.04 | 410.26 | 0 | 70 |
| D-90-25A | 554,715.0 | 7,562,621.0 | 141.04 | 421.57 | 0 | 70 |
| D-90-26 | 552,398.9 | 7,560,142.4 | 21.65 | 657.15 | 325 | 80 |
| D-90-26A | 552,398.9 | 7,560,142.4 | 21.64 | 644.97 | 325 | 80 |
| D-90-27 | 557,898.0 | 7,562,572.0 | 356.14 | 318.82 | 0 | 90 |
| DKUC | 556,348.0 | 7,565,649.0 | 1,002.00 | 65 | 237 | 67 |
| PRL10_39 | 553,497.1 | 7,562,363.0 | 50.35 | 414 | 0 | 70.6 |
| PRL10_40 | 554,005.0 | 7,562,357.0 | 183 | 485 | 0 | 68.9 |
| PRL10_41 | 554,504.0 | 7,562,358.0 | 231 | 597 | 24 | 71.3 |
| PRL10_42 | 555,039.0 | 7,562,428.0 | 299 | 672 | 0 | 69.7 |
| PRL10_43 | 552,983.4 | 7,561,789.6 | 28.57 | 375 | 0 | 71.9 |
| PRL10_44 | 554,008.2 | 7,561,846.2 | 182.83 | 657 | 0 | 69 |
| PRL10_45 | 555,046.0 | 7,560,986.0 | 262 | 1,225.00 | 0.1 | 79 |
| PRL10_46 | 554,487.0 | 7,561,891.0 | 415 | 1,000.00 | 0 | 66.2 |
| PRL10_47 | 553,515.0 | 7,561,373.6 | 91.94 | 685 | 0 | 69.6 |
| PRL10_48 | 553,988.9 | 7,561,391.6 | 184.65 | 810.7 | 0 | 67.3 |
| PRL11-49 | 552,699.0 | 7,561,613.4 | 12.94 | 364.2 | 342 | 86 |
| PRL11-50 | 552,953.2 | 7,561,207.8 | 3.38 | 532.4 | 325 | 82 |
| PRL11-51 | 552,323.1 | 7,561,757.5 | 6.73 | 341 | 45 | 45 |
| PRL11-52 | 554,344.6 | 7,562,816.1 | 19.86 | 227 | 0 | 70 |
| PRL11-53 | 553,131.8 | 7,561,470.9 | 3.85 | 505 | 0 | 80 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
| | | | | | | | | | | | | | | | | | | | |
| Hole ID | East (m) | North (m) | Elevation (m) | Total Depth (m) | Azimuth (°) | Dip (°) |
| PRL11-54 | 555,265.8 | 7,563,722.1 | 257.52 | 170 | 0 | 70 |
| PRL11-55 | 554,468.6 | 7,562,274.4 | 259.29 | 618 | 0 | 85 |
| PRL11-56 | 556,417.8 | 7,563,704.6 | 320.07 | 122 | 0 | 70 |
| PRL11-57 | 557,015.9 | 7,564,154.5 | 535.2 | 141.1 | 0 | 70 |
| PRL11-58 | 557,385.1 | 7,564,187.7 | 599.97 | 100 | 0 | 70 |
| PRL_08_35 | 557,879.8 | 7,562,724.2 | 334.7 | 317 | 360 | 90 |
| PRL_08_35a | 557,878.3 | 7,562,733.7 | 334.7 | 362.8 | 45.9 | 86 |
| PRL_08_36 | 557,876.9 | 7,562,272.1 | 370.9 | 559 | 140 | 89.5 |
| PRL_08_37 | 557,193.4 | 7,561,813.6 | 433.5 | 944.61 | 227.8 | 89.3 |
Table 7-3: Interpreted Mineralized Horizons, 1989-2011
| | | | | | | | | | | |
| Hole ID | From (m) | To (m) | Mineralized Horizon |
| D-04-28A | 438.8 | 439.4 | H5 |
| D-04-28A | 449.8 | 452.4 | H3 |
| D-04-28A | 470.8 | 474.2 | H0 |
| D-04-30 | 1,125.00 | 1,127.40 | H5 |
| D-04-30 | 1,136.00 | 1,141.00 | H3 |
| D-04-30 | 1,150.00 | 1,151.00 | H3_L1 |
| D-04-30 | 1,169.00 | 1,171.80 | H0 |
| D-04-31 | 1,125.80 | 1,129.60 | H5 |
| D-04-31 | 1,142.00 | 1,147.00 | H3 |
| D-04-31 | 1,154.00 | 1,155.00 | H3_L1 |
| D-04-31 | 1,170.40 | 1,176.20 | H0 |
| D-04-32 | 371 | 372 | H5 |
| D-04-32 | 385 | 387 | H3 |
| D-04-32 | 395.2 | 397.8 | H3_L1 |
| D-04-32 | 410.8 | 417.6 | H0 |
| D-04-33 | 379.4 | 381 | H5 |
| D-04-33 | 389 | 391 | H3 |
| D-04-33 | 400 | 402 | H3_L1 |
| D-04-33 | 412 | 415.2 | H0 |
| D-04-34 | 425 | 427 | H5 |
| D-04-34 | 437.2 | 438.4 | H3 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
| | | | | | | | | | | |
| Hole ID | From (m) | To (m) | Mineralized Horizon |
| D-04-34 | 444 | 446 | H3_L1 |
| D-04-34 | 460.2 | 464 | H0 |
| D-89-02 | 172 | 176 | H3 |
| D-89-02 | 183 | 185 | H3_L1 |
| D-89-02 | 201 | 206 | H0 |
| D-89-03 | 231 | 232.4 | H3 |
| D-89-03 | 235.8 | 240 | H3_L1 |
| D-89-03 | 255 | 259 | H0 |
| D-89-04 | 251.4 | 253.8 | H3_L1 |
| D-89-04 | 273 | 275 | H0 |
| D-89-05 | 152 | 154 | H3_L1 |
| D-89-05 | 164 | 168 | H0 |
| D-89-06 | 134 | 135 | H5 |
| D-89-06 | 139 | 141 | H3 |
| D-89-06 | 148 | 150 | H3_L1 |
| D-89-06 | 159 | 163 | H0 |
| D-89-07 | 43.15 | 43.65 | H5 |
| D-89-07 | 55 | 56 | H3 |
| D-89-07 | 68 | 69 | H3_L1 |
| D-89-07 | 84 | 91 | H0 |
| D-89-08 | 42.16 | 42.63 | H5 |
| D-89-08 | 53 | 54 | H3 |
| D-89-08 | 66 | 67 | H3_L1 |
| D-89-08 | 84 | 91 | H0 |
| D-89-09 | 444.8 | 446.4 | H5 |
| D-89-09 | 457 | 460 | H3 |
| D-89-09 | 467 | 469 | H3_L1 |
| D-89-09 | 484 | 488 | H0 |
| D-89-09A | 444.4 | 446.4 | H5 |
| D-89-09A | 457 | 460 | H3 |
| D-89-09A | 467 | 469 | H3_L1 |
| D-89-09A | 483 | 492 | H0 |
| D-89-09B | 442.2 | 445.6 | H5 |
| D-89-09B | 456 | 459 | H3 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
| | | | | | | | | | | |
| Hole ID | From (m) | To (m) | Mineralized Horizon |
| D-89-09B | 467 | 469 | H3_L1 |
| D-89-09B | 483 | 487 | H0 |
| D-90-10 | 434 | 435.4 | H3_L1 |
| D-90-10 | 442.6 | 446.4 | H0 |
| D-90-11 | 636.8 | 638 | H5 |
| D-90-11 | 647 | 651 | H3 |
| D-90-11 | 659.5 | 660.5 | H3_L1 |
| D-90-11 | 675.1 | 679.7 | H0 |
| D-90-12 | 594.8 | 595.6 | H5 |
| D-90-12 | 605 | 607 | H3 |
| D-90-12 | 613 | 614 | H3_L1 |
| D-90-12 | 633 | 637 | H0 |
| D-90-13 | 433.2 | 434.2 | H5 |
| D-90-13 | 442 | 445 | H3 |
| D-90-13 | 452.5 | 454 | H3_L1 |
| D-90-13 | 469 | 472 | H0 |
| D-90-14 | 154 | 155 | H5 |
| D-90-14 | 192.9 | 197 | H0 |
| D-90-15 | 293.4 | 294 | H5 |
| D-90-15 | 302.6 | 303.4 | H3 |
| D-90-15 | 310 | 312 | H3_L1 |
| D-90-16A | 418.4 | 419 | H5 |
| D-90-16A | 427 | 429 | H3 |
| D-90-16A | 431.1 | 432 | H3_L1 |
| D-90-17A | 472.2 | 473.2 | H3 |
| D-90-17A | 498 | 502 | H0 |
| D-90-18 | 961.8 | 963.8 | H5 |
| D-90-18 | 975 | 979 | H3 |
| D-90-18 | 988 | 989 | H3_L1 |
| D-90-18 | 1,010.00 | 1,013.00 | H0 |
| D-90-19 | 553.2 | 556.6 | H5 |
| D-90-19 | 563 | 566 | H3 |
| D-90-19 | 576 | 577 | H3_L1 |
| D-90-19 | 589 | 592 | H0 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
| | | | | | | | | | | |
| Hole ID | From (m) | To (m) | Mineralized Horizon |
| D-90-20 | 938 | 939.2 | H5 |
| D-90-20 | 948.4 | 951.4 | H3 |
| D-90-20 | 958 | 960 | H3_L1 |
| D-90-20 | 976 | 978 | H0 |
| D-90-22 | 990 | 993.6 | H5 |
| D-90-22 | 1,003.00 | 1,006.00 | H3 |
| D-90-22 | 1,013.00 | 1,018.00 | H3_L1 |
| D-90-22 | 1,031.00 | 1,036.00 | H0 |
| D-90-23 | 785 | 786 | H3 |
| D-90-23 | 792 | 793 | H3_L1 |
| D-90-23 | 810 | 814 | H0 |
| D-90-23A | 770 | 771 | H5 |
| D-90-23A | 781 | 782 | H3 |
| D-90-23A | 790 | 791 | H3_L1 |
| D-90-23A | 806 | 810 | H0 |
| D-90-24 | 1,018.00 | 1,023.20 | H5 |
| D-90-24 | 1,032.00 | 1,035.00 | H3 |
| D-90-24 | 1,042.00 | 1,045.00 | H3_L1 |
| D-90-24 | 1,057.00 | 1,060.00 | H0 |
| D-90-25A | 337 | 338 | H5 |
| D-90-25A | 342.2 | 346.8 | H3 |
| D-90-25A | 355 | 357 | H3_L1 |
| D-90-26 | 569 | 570 | H5 |
| D-90-26 | 580 | 582 | H3 |
| D-90-26 | 588 | 590 | H3_L1 |
| D-90-26A | 568 | 569 | H5 |
| D-90-26A | 580 | 582 | H3 |
| D-90-26A | 588 | 590 | H3_L1 |
| D-90-26A | 601.8 | 602.8 | H0 |
| DKUC | 19.7 | 24.2 | H3 |
| PRL10_39 | 253.4 | 256 | H3 |
| PRL10_39 | 262.6 | 263.6 | H3_L1 |
| PRL10_39 | 280.2 | 284.2 | H0 |
| PRL10_40 | 413 | 415 | H5 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
| | | | | | | | | | | |
| Hole ID | From (m) | To (m) | Mineralized Horizon |
| PRL10_40 | 432.6 | 435.2 | H3 |
| PRL10_40 | 437.6 | 441.4 | H3_L1 |
| PRL10_40 | 466.8 | 471.6 | H0 |
| PRL10_41 | 480 | 482 | H5 |
| PRL10_41 | 488 | 489.8 | H3 |
| PRL10_41 | 493.4 | 494.2 | H3_L1 |
| PRL10_41 | 500 | 503.6 | H0 |
| PRL10_42 | 585 | 585.8 | H5 |
| PRL10_42 | 596.2 | 598.4 | H3 |
| PRL10_42 | 605.4 | 606.2 | H3_L1 |
| PRL10_42 | 617.4 | 621 | H0 |
| PRL10_43 | 329 | 330 | H5 |
| PRL10_43 | 338 | 340.6 | H3 |
| PRL10_43 | 348 | 349.6 | H3_L1 |
| PRL10_43 | 365.2 | 369.6 | H0 |
| PRL10_44 | 609 | 609.8 | H5 |
| PRL10_44 | 612.8 | 616.8 | H3 |
| PRL10_44 | 621.4 | 623.6 | H3_L1 |
| PRL10_44 | 640.6 | 645 | H0 |
| PRL10_45 | 1,030.00 | 1,032.00 | H5 |
| PRL10_45 | 1,046.00 | 1,048.00 | H3 |
| PRL10_47 | 596.2 | 600.8 | H5 |
| PRL10_47 | 613.2 | 616.2 | H3 |
| PRL10_47 | 625 | 626 | H3_L1 |
| PRL10_47 | 638 | 641.2 | H0 |
| PRL10_48 | 735.2 | 736 | H5 |
| PRL10_48 | 747.4 | 750.8 | H3 |
| PRL10_48 | 757.4 | 759 | H3_L1 |
| PRL10_48 | 775.6 | 779.2 | H0 |
| PRL11-49 | 305 | 306 | H5 |
| PRL11-49 | 316 | 318 | H3 |
| PRL11-49 | 324 | 327 | H3_L1 |
| PRL11-49 | 343 | 348 | H0 |
| PRL11-50 | 471 | 473 | H5 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
| | | | | | | | | | | |
| Hole ID | From (m) | To (m) | Mineralized Horizon |
| PRL11-50 | 498.1 | 499 | H3 |
| PRL11-50 | 506 | 509 | H3_L1 |
| PRL11-50 | 523 | 527 | H0 |
| PRL11-51 | 208 | 210 | H5 |
| PRL11-51 | 236 | 241 | H3 |
| PRL11-51 | 248 | 250 | H3_L1 |
| PRL11-51 | 260 | 266 | H0 |
| PRL11-52 | 98 | 100 | H5 |
| PRL11-52 | 107 | 109 | H3 |
| PRL11-52 | 117 | 119 | H3_L1 |
| PRL11-52 | 128 | 132 | H0 |
| PRL11-53 | 436 | 438 | H5 |
| PRL11-53 | 448 | 451 | H3 |
| PRL11-53 | 458 | 460 | H3_L1 |
| PRL11-53 | 475 | 479 | H0 |
| PRL11-54 | 110 | 111 | H5 |
| PRL11-54 | 121 | 123 | H3 |
| PRL11-54 | 132 | 134 | H3_L1 |
| PRL11-54 | 146 | 151 | H0 |
| PRL11-55 | 538 | 539 | H5 |
| PRL11-55 | 550 | 551 | H3 |
| PRL11-55 | 555.4 | 560 | H3_L1 |
| PRL11-55 | 570 | 574 | H0 |
| PRL11-56 | 108 | 110 | H5 |
| PRL11-56 | 121 | 122 | H3 |
| PRL11-57 | 83 | 85 | H5 |
| PRL11-57 | 95 | 97 | H3 |
| PRL11-57 | 105 | 106 | H3_L1 |
| PRL11-57 | 113 | 119 | H0 |
| PRL11-58 | 50 | 51 | H5 |
| PRL11-58 | 60 | 61 | H3 |
| PRL11-58 | 69 | 70 | H3_L1 |
| PRL11-58 | 78 | 85 | H0 |
| PRL_08_35 | 285 | 286 | H5 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
| | | | | | | | | | | |
| Hole ID | From (m) | To (m) | Mineralized Horizon |
| PRL_08_35 | 298 | 299 | H3 |
| PRL_08_35 | 308 | 310 | H3_L1 |
| PRL_08_35a | 285 | 286 | H5 |
| PRL_08_35a | 296 | 298 | H3 |
| PRL_08_35a | 306 | 307 | H3_L1 |
| PRL_08_35a | 324.4 | 328.6 | H0 |
| PRL_08_36 | 498 | 499 | H5 |
| PRL_08_36 | 512.8 | 513.6 | H3 |
| PRL_08_36 | 519 | 521 | H3_L1 |
| PRL_08_36 | 535 | 539 | H0 |
| PRL_08_37 | 897 | 902.8 | H3 |
| PRL_08_37 | 913 | 914 | H3_L1 |
| PRL_08_37 | 925 | 928.4 | H0 |
7.2.1.2 Pre-2011 Diamond Drilling Procedures
A summary of drilling for the Skaergaard Intrusion, including channel and bulk sampling procedures by year and operator, is listed below.
1989 – Platinova Resources Ltd
•Nine BQ (36.4 mm diameter core) DDH, along with two wedge cuts, were completed totalling 2,673 m. Hole depths range from 115.2 m to 495.6 m.
•Eight Winkie holes (EWT 22 mm diameter core) were drilled totalling 110.0 m. Maximum hole depth was 23.3 m.
•The nominal grid spacing was approximately 600 m by 2,000 m.
•Holes ranged from vertical to inclined -70° to the north-northwest, north, or north-northeast, to optimally intersect the mineralized zones. The bulk of the drilling was nearly perpendicular to the mineralized domains.
•DDH core was logged for lithological, structural, geotechnical, density, and other attributes.
•No data on core recovery is available, however, Platinova considered that there was no issue with regard to sample bias due to material loss or gain.
1990 – Platinova Corona JV
•The Platinova Corona JV completed 18 BQ DDH plus five wedge cuts totalling 13,662 m from April to October 1990.
•Due to topography, the holes were sited on a non-regular pattern of approximately 200 m by 1.2 km.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
•Holes, drilled to grid west, ranged from vertical to inclined -70° to optimally intersect the mineralized zones. The majority of drill holes were nearly perpendicular to the mineralized domains.
•The maximum depth drilled was 1,065 m.
•No data on core recovery is available.
•A bulk sample was selected on the basis of a 5 m reconnaissance chip sampling program. Approximately 1.0 m3 was extracted by blasting.
•DDH core and the bulk sample were logged for lithological, structural, and other attributes.
2003 – Gryphon Metals Corp.
•The Skaergaard deposit was sampled by three 800 kg bulk samples taken from three locations, two sets of channel samples, and a single vertical Winkie hole drilled to a depth of 35.7 m.
•Bulk samples were obtained by blasting and breaking of oversize fragments with a sledgehammer.
•Channel samples were taken across stratigraphy from the top of the gold zone to the bottom of the palladium zone at the toe of the Forbindelses Glacier and across the fully exposed outcrop at Pukugagryggen, approximately 43 m in exposed length.
•Channel samples were obtained by cutting along previously marked lines that were 10 cm apart. A third cut was made approximately halfway between the initial cuts to facilitate the breaking of the material from the channels. The saw cuts were made to a nominal depth of 5 cm, and as deep as 8 cm. The sampling interval was generally 50 cm except when sampling was in a known area of the gold or palladium-enriched layers, at which point the sampling interval was reduced to 20 cm.
•The single Winkie hole was drilled to a total depth of 35.7 m.
•DDH core and channel samples were logged for lithological, structural, and some geotechnical attributes.
•Core recovery was recorded as 96.5%.
2004 – Skaergaard Minerals Corp.
•DDH core drilling consisted of eight holes totalling 5,495 m. Hole depths ranged from 212 m to 1,319 m.
•The holes were drilled mostly vertically, which was almost perpendicular (oblique 18° to 20°) to the dip of the mineralized trend.
•There was an overall irregular drill spacing due to the infill nature of the program.
•Two different types of drill rigs were used in the 2004 program: a Boyles 37 Rig and a Boyles 56 Rig.
•The core drilling was a mixture of BQ and NQ (47.6 mm) size boreholes.
•Drilling was conducted on a nominal 500 m by 500 m grid spacing.
•Core recovery was recorded at 100% and Rock Quality Designation (RQD) values were typically greater than 80.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
2008 – Platina Resources Ltd.
•Five DDH on a nominal 450 m by 700 m grid spacing were drilled, totalling 2,365 m.
•The drill holes were all collared on the Forbindelses Glacier and drilled using two helicopter portable Fordia A5 Golden Bear drill rigs.
•Drilling through the glacier was accomplished using an NW diameter (88.9 mm) mill-toothed tricone drill bit, and then once bedrock had been intersected, the hole was cased with NW diameter drill rods.
•The holes were drilled vertically, which was almost perpendicular (oblique 18° to 20°) to the dip of the mineralized trend. Subsequent structural logging based on oriented core indicated that the main mineralization controls are largely 78° to 80° to the drill direction.
•Overall core recovery was recorded as 96.5%. Poorer recoveries and/or core quality were noted in the vicinity of basaltic dykes, which are often strongly fractured/jointed, or in core cut by chlorite-lined micro-fractures running either subparallel to the core axis or at low intersection angles of 30° to 35°.
2010 – Platina Resources Ltd.
•Ten BTW (41.3 mm)/BQ DDH holes, drilled on a nominal 500 m by 500 m drill spacing, totalled 6,921 m.
•Hole dips ranged from -80° to -70° to optimally intersect the mineralized zones.
•The holes were drilled to true north, which was perpendicular to the orientation of the mineralized trend. Subsequent structural logging based on oriented core indicated that the main mineralization controls were largely perpendicular to the drill direction.
•Drill holes were drilled using three helicopter portable CDI 500 rigs.
•All holes commenced using BTW diameter diamond drill bits and running gear, telescoping down to BQ diameter at an appropriate depth.
•Core orientations were taken every run when in the Triple Group using a Reflex ACT II RD core orientation system.
•Core was placed into wooden core trays by the drill operators and transported to the Sødalen camp for processing.
•Depths were checked against the depth indicated on the core blocks, and rod counts were routinely carried out by the drillers.
•Average core recoveries were 96% with no core loss issues or significant sample recovery problems for mineralized zones.
2011 – Platina Resources Ltd.
•Diamond core drilling was used to obtain BTW/BQ core samples from 11 drill holes totalling 3,147 m.
•Hole dips ranged from -86° to -45° to optimally intersect the mineralized zones.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
•The holes were drilled to true north, which was perpendicular to the orientation of the mineralized trend. Subsequent structural logging based on oriented core indicated that the main mineralization controls were largely perpendicular to the drill direction.
•Holes were drilled using three heli-portable CDI 500 drill rigs.
•All holes commenced using BTW diameter diamond drill bits and running gear, telescoping down to BQ diameter at an appropriate depth.
•Core orientations were taken every run when in the Triple Group using a Reflex ACT II RD core orientation system.
•Core was placed into wooden core trays by the drill operators and transported to the Sødalen camp for processing.
•Depths were checked against the depth indicated on the core blocks and rod counts were routinely carried out by the drillers.
•Average core recoveries were 84% with no core loss issues or significant sample recovery problems for mineralized zones.
7.2.1.3 Pre-2011 Collar Surveys
1989 – Platinova Resources Ltd.
•Seven of the nine drill hole collar locations were surveyed by Asiaq of Nuuk, Greenland in July 2011 following the completion of the Platina drill programs.
1990 – Platinova Resources Ltd.
•The drill hole locations were surveyed by HNIT HF, Reykjavik in September 1990 following the completion of the drill program.
•The holes were surveyed in a local grid system and then transformed into latitude/longitude.
•The local grid system is horizontal and therefore no topographic control was used. The surveyed collars have estimated accuracy better than 5.0 cm.
•Eight of the 18 drill hole collar locations were resurveyed by Asiaq of Nuuk, Greenland in July 2011 following the completion of the Platina drill programs.
2003 – Gryphon Metals Corp.
•No information is available.
2004 – Skaergaard Minerals Corp.
•All 2004 and previous drill hole locations were surveyed by GPS and given UTM coordinates using the WGS84, Zone 25N datum.
2008 – Platina Resources Ltd.
•All 2008 drill hole positions were located with a Garmin handheld GPS.
•Collar locations were surveyed by Asiaq of Nuuk, Greenland using RTK GPS with a GRS80 ellipsoid. Expected accuracy is ±50 mm for easting, northing, and elevation coordinates.
•Topographic surface used 2009 GeoEye satellite which collected imagery at a resolution of 0.5 m and topography at a resolution of two metres.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
2010 – Platina Resources Ltd.
•All 2010 drill hole positions were initially located with a Garmin handheld GPS using UTM coordinates, WGS84, Zone 25N. The final collar positions were taken using the same Garmin GPS but left on ‘averaging’ mode for a period of 15 minutes.
•Five of the ten hole collar locations were subsequently surveyed by Asiaq of Nuuk, Greenland in July 2011 using RTK GPS with GRS80 ellipsoid. Expected accuracy is ±50 mm for easting, northing, and elevation coordinates.
2011 – Platina Resources Ltd.
•All 2011 drill-hole positions were originally located with a Garmin handheld GPS using UTM coordinates, WGS84, Zone 25N.
•Ten of the 14 drill hole collar locations were surveyed by Asiaq of Nuuk, Greenland, in July 2011 following the completion of the Platina drill programs.
7.2.1.4 Pre-2011 Downhole Surveying
Pre-2004 Drilling
•No information is available on downhole surveying for holes drilled prior to 2004.
2004 – Skaergaard Minerals Corp.
•Downhole survey tool provided bearing and dip measurements for part of or the entire length of the hole at 15 m intervals.
•Hole deviation was limited to a maximum of 3°.
2008 – Platina Resources Ltd.
•All holes were vertical in orientation and surveyed at 50 m intervals using a Reflex EZ-shot camera.
2010 – Platina Resources Ltd.
•A Deviflex (manufactured by Devico) survey tool was used to survey the holes at 50 m intervals. One hole was surveyed with a Flexit multi-shot survey tool, which is affected by magnetic fields.
2011 – Platina Resources Ltd.
•Downhole surveys were taken on most holes using a Reflex Gyro tool.
•Two surveys were taken per hole, one when the tool was inserted into the holes, and a second when it was retrieved.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
7.2.1.5 Pre-2011 Logging Procedures
1989 – Platinova Resources Ltd.
•All DDH core was geologically logged.
•Logging of diamond core recorded lithology, mineralogy, texture, mineralization, colour, and other features of the samples.
•No core photos or geotechnical logging records have been located.
•The methodology used for density measurement of these samples is not documented.
1990 – Platinova Resources Ltd.
•All DDH core was geologically logged.
•Logging of diamond core recorded lithology, mineralogy, texture, mineralization, colour, and other features of the samples.
•Primary data was collected by Corelog2 and Micromine databases. Individual drawings were compiled for each drill hole.
•No core photos or geotechnical logging records have been located.
•The methodology used for density measurement of these samples is not documented.
2003 – Gryphon Metals Corp.
•All DDH core was geologically logged including lithology, mineralogy, texture, and magnetic susceptibility.
•No core photos have been located.
2004 – Skaergaard Minerals Corp.
•All drill core was geologically logged; describing rock types, textures, mineralogy, structure, alteration and measuring magnetic susceptibility, percent recovery, and RQD.
•All core was photographed at a resolution of five boxes per picture.
2008 – Platina Resources Ltd.
•When at site, Platina and SRK geologists logged the core for geology (describing rock types, textures, alteration, and mineralogy) and geotechnical data (recovery, fractures, and RQD.)
•Magnetic susceptibility readings were taken every metre.
•Each core tray was photographed at a resolution of one tray per photograph.
•Handheld X-ray fluorescence (XRF) readings were taken at 0.25 m intervals throughout Triple Group stratigraphy. A NITON XL3t handheld XRF unit (made by Thermo Scientific) was used with 20 second counts being made over three different ranges of the spectrum.
•Density measurements for Platina drill holes were taken from DDH core using the Archimedean submersion technique, whereby the mass of the drill core sample is measured when dry in air and also when submerged in water. All samples were halved BQ diameter drill core; specific gravity measurements were taken for each sample prior to them being placed into individual sample bags.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
2010 – Platina Resources Ltd.
•SRK geologists logged the full core for geology (describing rock types, textures, alteration, and mineralogy) and geotechnical data (recovery, fractures, and RQD). Magnetic susceptibility readings were taken every metre within the Triple Group, and each core tray was photographed at a resolution of one tray per photograph.
•All data was recorded electronically onto laptop computers equipped with Maxwell LogChief software.
•Diamond core was reconstructed into continuous runs for orientation marking within mineralization using a Reflex ACT II RD orientation system.
•Density measurements for Platina drill holes were taken from DDH core using the Archimedean submersion technique.
2011 – Platina Resources Ltd.
•Platina and SRK Exploration Services geologists logged the full core for geology (describing rock types, textures, alteration, and mineralogy) and geotechnical data (recovery, fractures, and RQD).
•All data was recorded electronically onto laptop computers equipped with Maxwell LogChief software.
•Magnetic susceptibility readings were taken every metre within the Triple Group.
•Each core tray was photographed at a resolution of one tray per photograph in dry form.
•Density measurements for Platina drill holes were taken from DDH core using the Archimedean submersion technique.
7.2.2 2021 MPM Drilling
7.2.2.1 Summary
MPM completed a drilling program between August and September 2021 comprising a total of 32 NQ holes over 7,787 m and four main channels spanning 240.76 m. Holes were generally spaced approximately 300 m apart, ranged in depth from 75 m to 551 m, and were orientated between 55° and 85° towards the north, east, or south to optimally intersect the mineralization. Drill planning priorities were to cover the relatively undrilled main part of the deposit to the east under the glacier to upgrade Inferred Mineral Resources to Indicated Mineral Resources, and to expand the Mineral Resource to the eastern and western margins of the deposit. Special priority was applied to the completion of additional drilling north of the Forbindelses Glacier to support Mineral Resource classification on the plateau area. A list of the MPM drill holes and H0-H5 horizon intercepts is provided in Table 7-4 and Table 7-5, respectively, and their locations are shown along with pre-2011 drilling in a plan view in Figure 7-1. Figure 7-2 shows a typical cross-section through the central portion of the
deposit. Note that grade continuity is better shown in plan view at Skaergaard; zooming out to show grade continuity in section renders the horizon grades unreadable.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Table 7-4: MPM Drill Hole Locations, 2021
| | | | | | | | | | | | | | | | | | | | |
| Hole ID | East (m) | North (m) | Elevation (m) | Total Depth (m) | Azimuth (°) | Dip (°) |
| MPD001 | 553,948.0 | 7,562,715.5 | 2.6 | 206 | 0 | 70 |
| MPD002 | 554,428.5 | 7,563,121.0 | 5.7 | 131 | 358.5 | 70 |
| MPD003 | 554,666.8 | 7,563,303.8 | 57.7 | 134 | 90 | 85 |
| MPD004 | 554,947.9 | 7,563,427.1 | 90.5 | 130 | 90 | 85 |
| MPD005 | 553,740.1 | 7,562,556.0 | 23.1 | 260 | 178.9 | 69.8 |
| MPD006 | 554,335.6 | 7,562,489.6 | 129.9 | 430 | 0.3 | 68.8 |
| MPD007 | 557,500.3 | 7,562,845.3 | 301.8 | 375 | 89 | 82.8 |
| MPD008 | 557,206.5 | 7,562,883.1 | 286.2 | 377 | 91.6 | 85.1 |
| MPD009 | 557,307.7 | 7,564,179.4 | 603.1 | 137 | 358.5 | 68 |
| MPD010 | 555,229.7 | 7,563,328.7 | 135.1 | 207 | 86.5 | 86.7 |
| MPD011 | 556,910.3 | 7,563,008.5 | 269.8 | 341.2 | 90 | 70 |
| MPD012 | 557,361.8 | 7,564,301.9 | 604.2 | 91 | 86.1 | 86.5 |
| MPD013 | 557,173.8 | 7,564,309.9 | 556.6 | 86 | 85 | 70 |
| MPD014 | 556,626.8 | 7,563,143.5 | 255.7 | 290 | 90 | 83.6 |
| MPD015 | 557,022.8 | 7,564,160.2 | 537.1 | 251 | 180 | 53.9 |
| MPD016 | 556,408.5 | 7,563,245.2 | 237.3 | 257 | 96 | 83.8 |
| MPD017 | 557,465.9 | 7,562,519.6 | 328.4 | 551 | 95.5 | 84.8 |
| MPD018 | 556,342.8 | 7,562,960.4 | 233.6 | 371 | 90 | 86.9 |
| MPD019 | 555,508.6 | 7,563,288.3 | 164.9 | 243 | 90 | 88 |
| MPD020 | 555,772.0 | 7,563,011.1 | 190.1 | 341 | 90 | 85 |
| MPD021 | 556,123.2 | 7,563,317.9 | 214.4 | 241 | 90 | 85.5 |
| MPD022 | 555,808.0 | 7,563,300.0 | 191 | 216 | 90 | 85 |
| MPD023 | 555,528.2 | 7,563,571.3 | 160.7 | 148 | 0 | 70.1 |
| MPD024 | 555,825.4 | 7,563,545.4 | 187.6 | 156 | 0.6 | 71.3 |
| MPD025 | 556,070.0 | 7,563,085.6 | 211.6 | 326 | 90 | 84.8 |
| MPD026 | 554,021.5 | 7,563,214.2 | 15.9 | 75 | 0.6 | 70.5 |
| MPD027 | 555,485.9 | 7,562,952.6 | 162.3 | 332 | 93.4 | 84.7 |
| MPD028 | 556,118.8 | 7,563,550.8 | 205 | 143 | 0.5 | 70.3 |
| MPD029 | 555,256.2 | 7,563,518.3 | 120.7 | 131 | 0.8 | 70.4 |
| MPD030 | 556,889.5 | 7,563,280.9 | 265.9 | 221 | 274 | 85.7 |
| MPD031 | 556,669.9 | 7,563,423.4 | 245.5 | 179 | 0 | 70 |
| MPD032 | 553,351.5 | 7,562,139.6 | 45 | 410 | 344.5 | 69.7 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Table 7-5: Interpreted Mineralized Horizons, 2021
| | | | | | | | | | | |
| Hole ID | From (m) | To (m) | Mineralized Horizon |
| MPD001 | 127.5 | 128.5 | H5 |
| MPD001 | 137.5 | 139.75 | H3 |
| MPD001 | 149.5 | 151 | H3_L1 |
| MPD001 | 163.25 | 167.75 | H0 |
| MPD002 | 37.75 | 39 | H5 |
| MPD002 | 46 | 51.75 | H3 |
| MPD002 | 58.5 | 60.5 | H3_L1 |
| MPD002 | 77.75 | 81.5 | H0 |
| MPD003 | 60.5 | 61.75 | H5 |
| MPD003 | 72 | 74 | H3 |
| MPD003 | 81 | 82.75 | H3_L1 |
| MPD003 | 99 | 102.5 | H0 |
| MPD004 | 80 | 81.25 | H5 |
| MPD004 | 87.25 | 88.5 | H3 |
| MPD004 | 99.75 | 101 | H3_L1 |
| MPD004 | 107 | 109.75 | H0 |
| MPD005 | 220 | 221.25 | H5 |
| MPD005 | 237 | 238 | H3 |
| MPD005 | 245 | 246.25 | H3_L1 |
| MPD005 | 248.5 | 251.75 | H0 |
| MPD006 | 322 | 325.5 | H3 |
| MPD006 | 329 | 330.25 | H3_L1 |
| MPD006 | 336.25 | 339.5 | H0 |
| MPD007 | 309.5 | 310.5 | H5 |
| MPD007 | 319.75 | 321.25 | H3 |
| MPD007 | 332 | 333.25 | H3_L1 |
| MPD007 | 336.5 | 341 | H0 |
| MPD008 | 329.75 | 330.75 | H5 |
| MPD008 | 340.75 | 344 | H3 |
| MPD008 | 350.75 | 352 | H3_L1 |
| MPD008 | 363.5 | 367.25 | H0 |
| MPD009 | 72.25 | 73.25 | H5 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
| | | | | | | | | | | |
| Hole ID | From (m) | To (m) | Mineralized Horizon |
| MPD009 | 80.5 | 82 | H3 |
| MPD009 | 89 | 90.5 | H3_L1 |
| MPD009 | 97 | 103.75 | H0 |
| MPD010 | 148.25 | 150.25 | H5 |
| MPD010 | 159.5 | 160.75 | H3 |
| MPD010 | 168.75 | 170 | H3_L1 |
| MPD010 | 177 | 180.75 | H0 |
| MPD011 | 278.25 | 279.25 | H5 |
| MPD011 | 288.5 | 292.5 | H3 |
| MPD011 | 298.75 | 299.75 | H3_L1 |
| MPD011 | 311 | 315 | H0 |
| MPD012 | 9.25 | 10.25 | H5 |
| MPD012 | 16.5 | 17.5 | H3 |
| MPD012 | 25.25 | 26.75 | H3_L1 |
| MPD012 | 35.75 | 42.75 | H0 |
| MPD013 | 20.5 | 21.5 | H5 |
| MPD013 | 28.75 | 36 | H3 |
| MPD014 | 251.25 | 252.5 | H5 |
| MPD014 | 256 | 257.75 | H3 |
| MPD014 | 263.75 | 265 | H3_L1 |
| MPD014 | 276 | 280 | H0 |
| MPD015 | 168.5 | 169.5 | H5 |
| MPD015 | 191.25 | 193 | H3 |
| MPD015 | 208.5 | 210.5 | H3_L1 |
| MPD015 | 227 | 235.25 | H0 |
| MPD016 | 203 | 204 | H5 |
| MPD016 | 212.5 | 215.5 | H3 |
| MPD016 | 224 | 225.5 | H3_L1 |
| MPD016 | 235.75 | 239.5 | H0 |
| MPD017 | 480.75 | 482 | H5 |
| MPD017 | 489.25 | 492.25 | H3 |
| MPD017 | 500.25 | 501.5 | H3_L1 |
| MPD017 | 512.25 | 516.75 | H0 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
| | | | | | | | | | | |
| Hole ID | From (m) | To (m) | Mineralized Horizon |
| MPD018 | 293 | 294.25 | H5 |
| MPD018 | 308.25 | 313.25 | H3 |
| MPD018 | 320.75 | 322.25 | H3_L1 |
| MPD018 | 334.25 | 338.25 | H0 |
| MPD019 | 184.75 | 192 | H3 |
| MPD019 | 199.25 | 201 | H3_L1 |
| MPD020 | 262.75 | 264 | H5 |
| MPD020 | 274 | 276.5 | H3 |
| MPD020 | 286.5 | 287.25 | H3_L1 |
| MPD020 | 298.75 | 302.25 | H0 |
| MPD021 | 179.25 | 181.25 | H5 |
| MPD021 | 188 | 190.75 | H3 |
| MPD021 | 192.5 | 194 | H3_L1 |
| MPD021 | 201.75 | 206.75 | H0 |
| MPD022 | 183.75 | 184.5 | H5 |
| MPD022 | 193.75 | 194.75 | H3 |
| MPD022 | 198.5 | 199.5 | H3_L1 |
| MPD022 | 209 | 212.25 | H0 |
| MPD023 | 71.5 | 72.75 | H5 |
| MPD023 | 82.25 | 83.5 | H3 |
| MPD023 | 91.25 | 92.25 | H3_L1 |
| MPD023 | 99 | 103.25 | H0 |
| MPD024 | 96 | 97 | H5 |
| MPD024 | 104 | 105 | H3 |
| MPD024 | 106.5 | 107.5 | H3_L1 |
| MPD024 | 115 | 118.75 | H0 |
| MPD025 | 251 | 251.5 | H5 |
| MPD025 | 257 | 264 | H3 |
| MPD025 | 270.75 | 272 | H3_L1 |
| MPD025 | 284 | 288.5 | H0 |
| MPD026 | 9.25 | 10 | H5 |
| MPD026 | 17 | 19.25 | H3 |
| MPD026 | 26.25 | 27.5 | H3_L1 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
| | | | | | | | | | | |
| Hole ID | From (m) | To (m) | Mineralized Horizon |
| MPD026 | 45 | 49.25 | H0 |
| MPD027 | 280.75 | 281.75 | H5 |
| MPD027 | 290.5 | 294.25 | H3 |
| MPD027 | 313.75 | 318 | H0 |
| MPD028 | 85 | 86.5 | H5 |
| MPD028 | 97 | 98.5 | H3 |
| MPD028 | 105.25 | 106.75 | H3_L1 |
| MPD028 | 119.75 | 124.75 | H0 |
| MPD029 | 60.5 | 61.75 | H5 |
| MPD029 | 67.75 | 69.5 | H3 |
| MPD029 | 76 | 77.5 | H3_L1 |
| MPD029 | 84 | 87.25 | H0 |
| MPD030 | 180.5 | 181.5 | H5 |
| MPD030 | 192 | 193 | H3 |
| MPD030 | 201 | 203 | H3_L1 |
| MPD031 | 111.5 | 112.25 | H5 |
| MPD031 | 117.25 | 119.75 | H3 |
| MPD031 | 128.25 | 129.5 | H3_L1 |
| MPD031 | 143 | 146.75 | H0 |
| MPD032 | 285.5 | 286.5 | H5 |
| MPD032 | 291.5 | 297.75 | H3 |
| MPD032 | 304.75 | 306 | H3_L1 |
| MPD032 | 321.75 | 325.25 | H0 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 7-2: Typical Section View, Central Portion of Skaergaard Deposit Facing East
7.2.2.2 Diamond Drilling Procedures
In 2021, the QP visited active drill pads for the Xenix 85 Discovery 1 drills of both sizes. The smaller sized drill was capable of 600 m of drilled depth, whereas the large drill was capable of approximately 1,500 m. All four of the drills used three metre rod lengths and were active on the Forbindelses Glacier at the time of the field visit. Average core recovery was 98.7% with core recovery in mineralized zones averaging 99.4%.
Drilled core was put into three-row wooden core boxes which were securely closed with plastic fiber tape. Then six to 21 boxes were bundled with two nylon sling straps for helicopter slinging to the Skaergaard camp. The core was then flown to camp, with radio communications advising the geologist to prepare for more core. Core was dropped directly in front of the pertinent tents, unfastened, unpacked, and carried into the logging tents by either one or two people depending on individual comfort level in walking backward or controlling direction in solitary fashion. The QP concurs with carrying core boxes to individual levels of comfort to avoid spillage. There were four core logging tents at the Skaergaard camp.
Each tent received a separate drill hole. Overflow core input was left on pallets outside the doors of each tent to await logging.
Core was photographed after logging and core mark-up using a frame mounted with a digital camera, lights, and tape measure to ensure consistency. Photographs were taken dry and wet and were stored directly on a laptop which was backed up to an external hard drive daily.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
7.2.2.3 Channel Sampling Procedures
At the time of the site visit, channel samples were being gathered at leucozone outcrops on a small island on the west side of the deposit. MPM channel samples were laid out tentatively in Leapfrog, and then ground-truthed by the site geologists in preparation for cutting. Once collars were placed, the planned channel was painted on the surface of the rock along with the sample boundaries. An Xploration Services (XS) sampling crew consisting of two workers then cut two parallel lines into the rock along the line, with a crosscut at every sample boundary. Sample bags were loaded into the cuts in the rock in the right order, and samples were then collected by an MPM geologist using a small sledgehammer and rock chisel.
Collars were picked up with a handheld Garmin GPS, sometimes using new collar IDs with each inflection point or step-out in the sampling lines
The QP visited the crew performing the channel samples and found that the work was performed according to industry best practice. Samples were relatively uniform in width and depth. The QP also notes that an allowance was made for the sample lengths to vary according to the trigonometric equivalent of the vertical sample length, since channels were often laid out at low angles to bedding. Chipping of samples was thorough and minimized material loss. Identification tags were placed inside the bags facing outward to ensure samples could be easily identified in future steps.
Pre-2011 channels were located and GPS surveyed by two MPM personnel over the drill season. The MPM geologist noted that the earliest generation of channel samples were of markedly poorer quality than those taken post-1990.
7.2.2.4 Collar Surveys
During the field season, MPM laid out and picked up collars with a handheld Garmin GPS. The QP is of the opinion that this method of laying out holes is sufficient for the Project given that the wide spacing of the drill holes makes precise layout less important than projects with tighter drill spacing.
MPM contracted Asiaq to locate every hole and channel sample with differential GPS at the end of the field season.
•All 2021 drill hole collars were surveyed by Asiaq except MPD022 which was surveyed by field geologists using a handheld GPS.
•Asiaq surveys were carried out using RTK-GPS equipment. East and North coordinates were provided in UTM grid system WGS84, Zone 25N, and elevations were provided using the Greenland Vertical Reference 2016.
7.2.2.5 Downhole Surveying
The QP assisted MPM in the layout and prioritization of the planned drill holes for 2021, which were then updated as the drill season progressed.
Before collaring each hole, a DeviAligner tool was used to set the azimuth and dip of the mast to begin drilling. After drilling, the drillers took downhole survey measurements with either a Reflex single-shot tool or a Devi-Gyro multi-shot tool, at nominal 30 m increments. No single shots were taken at the end of the hole. An initial logistical complication resulted in hole MPD-001 receiving only DeviAligner collar data. The remaining holes were surveyed downhole using both methods described above.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
The survey information lagged the drill core and logging results by several days, which prevented quality control of the drill directions or downhole survey results before the drills had already moved onto the next hole.
The negative consequence of the logistical issues is that downhole gyroscope surveys are available for only 21 of 32 holes. For a further two holes, there are two or three single-shot surveys to support the location information, and for the remaining nine holes there is only collar survey data available because either no survey was completed or because the downhole survey data did not pass QA/QC.
7.2.2.6 Logging Procedures
MPM had written procedures and a core library to provide guidance for consistent geological logging. Initial ‘Quick Logs’ were recorded and entered into Microsoft (MS) Excel spreadsheets to provide prompt information on the drilling program's progress.
Once the core was laid out on standing-level inclined racks inside the core logging tents, a geologist made individual metre marks on the core in pencil and then measured RQD, magnetic susceptibility, and core recovery. This data was entered into GeoSpark software. As geologists experienced some loss of compiled measurements in the magnetic susceptibility metres, they resorted to recording a single measurement at a time, per metre, into the program.
The geologists then marked out sample boundaries and lithology boundaries in pencil. The geologist then recorded lithology, alteration, structure, and sample intervals into the GeoSpark logging program. QC samples and blank materials were inserted into the GeoSpark sample stream automatically, and put into sample bags at the end of the core cutting phase. An overall rate of one in 10 QC samples included one in 50 crusher duplicates and one in 50 field duplicates, where the other half of the core was taken for sampling, and the empty section of the box was labelled with the sample number.
These procedures were followed by detailed:
•Geological logging to record lithology, colour, grain size, texture, and mineralization.
•Structural logging to record planar features and geological contacts.
•Geotechnical logging to record core recovery, RQD, hardness, weathering, and the number of joints.
•Magnetic susceptibility logging recorded every metre using a Terraplus KT-10R s/c meter on a 10 kHz setting.
7.2.2.7 SLR QP Comments
Original borehole coordinates, collar elevations, and depths drilled from the surface of the Forbindelses Glacier are based on historical surveying. This glacier has significantly receded since 1989.
In 2021, MPM procured new high-resolution satellite imagery and topographic data, which was incorporated into the 2021 and 2022 MREs.
Asiaq surveyed 39 drill holes and two channels with RTK-GPS equipment in July 2011. The remaining 32 drill holes and 24 channels on the Forbindelses Glacier were not located. The QP recommends that GRML attempt to locate and survey the remaining collar and channel data in the field. The QP recognizes that resurveying the drill holes collared on the glacier is unlikely.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
The excellent work done in locating and photographing the extant old channels shows that SLR’s pre-2011 channel repositioning in 2021 was generally accurate, although the samples are lower in elevation on the west side of the outcrop. Sample lengths and surveyed lengths, and azimuths do not agree with the pre-2011 samples in the SLR database. The photographs of the 1980s channel samples show that channel quality differs from that of the 2004 sampling. This means that the pre-2011 channel samples are unlikely to support classification higher than Inferred Mineral Resource material.
The QP accepts that the collar positions are reasonably accurate overall and that the magnitude of the elevation errors would not materially affect the Mineral Resource estimate, given the drill spacing and the underground mining model. The QP recommends that GRML have the collar positions reviewed by a GIS professional to ensure that the correct datums and conversions are used for each hole position.
The QP notes that the broad spacing of the drilling and the consistent dip results of planned dips offset concerns about the downhole survey data, which was not acquired successfully. Most of the holes on the glacier were drilled vertically, and the remainder were generally oriented at 70° to the north. The QP did not note significant issues with drill hole deviation for holes which had both multi-shot and Devi-Gyro data, and the host rock is generally competent and consistent. Therefore, the QP concludes that the nine holes lacking good-quality downhole survey data likely do not deviate enough to be consequential to the results of the Mineral Resource estimate.
To avoid downhole survey recording issues in future, the QP recommends that GRML retain a dedicated geological technician for the next drill program to check each hole before drilling and perform end of hole (EOH) downhole surveys as a QC check and a superseding survey to the downhole checks performed during the actual drilling.
The QP found good correlation between low magnetic susceptibility readings and leucocratic gabbros. The QP recommends further investigation into using magnetic susceptibility (possibly confounded by dyke material) to roughly locate the stratigraphic position of mineralized horizons in order to position sampling and to help correlate mineralized horizons from hole to hole.
The QP concludes that there are no known drilling, sampling, or recovery factors that could materially impact the accuracy and reliability of the results.
7.3 Hydrogeology and Geotechnical Data
No hydrogeological or geotechnical surveys have been undertaken for this early-stage exploration project.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
8.0 Sample Preparation, Analyses, and Security
The following section summarizes sample preparation, analyses, security, and QA/QC procedures used over the exploration history of the Project. This section is largely taken from SLR (2022).
8.1 Sample Preparation and Analysis
8.1.1 1989 – Platinova Resources Ltd.
•Diamond and Winkie core was BQ, sampled on geological intervals (1.0 m), then cut into quarter (1.0 m) core.
•The sample preparation of diamond drill core involved oven drying, coarse crushing of the half or quarter core sample followed by pulverization of the entire sample, then split to produce a subsample for analysis.
•Gold was analyzed by cold hydrobromic dissolution with an atomic adsorption spectroscopy (AAS) finish with a lower detection limit (LDL) of 10 ppb.
•A separate split was used for palladium and platinum using fire assay with a direct coupled plasma (DCP) finish (DL 2 ppb Pd, 5 ppb Pt).
•Subsequent 0.20 m half BQ core were selected in the anomalous grade zones.
8.1.2 1990 – Platinova Resources Ltd.
•BQ sized core was sampled at geological intervals.
•The core was cut into thirds using 1.0 m composites to locate the gold horizon (except for hole 90-10, which was sampled in 3.0 m composites)
•The sample preparation of diamond core involved oven drying, coarse crushing of the one-third core samples followed by pulverization of the entire sample, then split to produce a subsample for analysis.
•Subsequent 0.2 m sampling of one third BQ core was completed in mineralized zones.
•A third round of sampling was completed as some samples had not been cut parallel to the core axis.
•The remaining wedge-shaped core was sampled in random lengths based on variances in the ratio of weight to length.
•Palladium and platinum were analyzed using fire assay with a DCP-AAS finish (Bondar-Clegg & Company Ltd. (Bondar-Clegg), XRAL Laboratories (XRAL)).
•Gold was analyzed by fire assay with a bromine-hydrobromic acid gold extraction with an AAS finish at Cominco’s laboratory (Cominco).
•Located in Canada, these three independent laboratories were referred to as accredited laboratories in previous reports (e.g. RPA, 2005), but the exact details of the accreditations are unknown to the QP at present.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
8.1.3 2003 – Gryphon Metals Corp.
•The Winkie drill core was sampled at 20 cm intervals, and each section was placed in plastic bags with proper sample identification. These bags were then placed in plastic pails.
•The channel samples were taken at 50 cm intervals or 20 cm intervals in areas of known gold or palladium mineralization. These samples were then placed in plastic bags in their entirety and these bags were in turn placed in plastic pails. The pails were sealed with lids and duct tape before being shipped.
•Bulk samples were crushed to pass a -10 mesh and 2.0 kg subsamples were taken.
•Channel samples were crushed to a -20 mesh before approximately 100 g to 200 g samples were split out and pulverized.
•The subsamples were then pulverized to pass a -150 mesh.
•The analytical techniques involved fire assay with an AAS finish (30 g) for gold, platinum, and palladium, inductively coupled plasma (ICP) with aqua regia digest for trace elements, and fusion followed by acid digest and an ICP finish for whole rock analysis (Al, Sb, As, Ba, Bi, Cd, Ca, Cr, Co, Cu, Fe, Ge, La, Pb, Mg, Mn, Hg, Mo, Ni, P, K, Sc, Ag, Na, Sr, Tl, Ti, W, V, Zn, and Zr and Al2O3, BaO, CaO, Fe2O3, K2O, MgO, MnO, Na2O, P2O5, SiO2, TiO2), and Loss of Ignition (LOI) at 2,000°F by whole rock fusion followed by acid digest and an ICP finish.
8.1.4 2004 – Skaergaard Minerals Corp.
•First pass sampling consisted of quarter core at 1.0 m intervals from 10 m above L2.
•Second pass mineralized sample lengths ranged from 20 cm to 50 cm.
•Initial samples were prepared for inductively coupled plasma emission spectroscopy (ICP-ES), inductively coupled plasma mass spectrometry (ICP-MS), and for gold, palladium, and platinum by fire assay.
•In addition to the 2004 drill holes, two holes from the 1990 program that were not originally sampled to the final depth of the drill hole were sampled.
•On conclusion of the program, all sampled drill core was shipped to Vancouver storage for further detailed sampling. Once the initial results were received, the mineral horizons were resampled at 0.2 m intervals.
•Each sample was crushed in its entirety. A 250 g cut was pulverized and screened to -80 mesh.
•A one assay-ton (29 g) aliquot was assayed by fire assay for platinum, palladium, and gold.
•A 0.5 g aliquot was analyzed by multi-spectrographic techniques for 32 elements and whole rock analysis.
•CRMs were inserted in the sample stream. No blanks were inserted.
8.1.5 2008 – Platina Resources Ltd.
•Two passes of sampling occurred with the first using quarter core at 1.0 m sample lengths to distinguish mineralized zones.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
•Each quarter core sample was placed into a calico bag, along with an aluminum tag designating the sample number.
•The calico bag was then tied off and had the sample number written on the outside of the bag. The calico bags were then placed into a polyweave bag with the other samples in that batch.
•The polyweave bag was tied off with a security tag and had the company name, batch number, and sample numbers written on its exterior. Each batch was then placed into a plastic barrel and secured with a cable tie.
•Sample preparation was conducted according to OMAC Laboratories Ltd.’s (OMAC, now ALS Limited (ALS)) P5 procedure whereby all samples were dried and then, jaw and cone crushed to <2.0 mm, riffle split 1.0 kg of coarse material, and then pulverized to 100 μm (all fractions were retained). Gold, palladium, and platinum were analyzed via 30 g lead fire assay with an inductively coupled plasma optical emission spectrometry (ICP-OES) finish.
•The remaining three-quarter core was shipped to Perth, Australia where second pass sampling was conducted at the Platina head office in Australia. Platina geologists sampled the core at 0.2 m intervals. These samples were prepared at the independent SGS Laboratories at Perth (SGS Perth).
•At SGS Perth, a total of 200 samples were submitted for sample preparation, consisting of crushing all samples to <2.0 mm using a jaw crusher.
•Approximately 250 samples were sent to the independent Genalysis Laboratory (Genalysis) in Perth, Australia (now Intertek Genalysis). Preparation of samples was via conventional crushing in a chrome-steel pulverizer bowl achieving a grind of 85% passing minus 75 μm (dependent on sample hardness). All samples underwent nickel collection fire assay (50 g charge), analysis conducted by ICP-MS. For all other elements, samples were analyzed via fusion.
8.1.6 2010 – Platina Resources Ltd.
•Core was split on site using a diamond saw. One half of the core was subsequently split in quarters.
•Two passes of sampling occurred, with the first using quarter core at 1.0 m sample lengths to distinguish mineralized zones.
•Each quarter core sample was placed into a calico bag, along with an aluminum tag designating the sample number.
•The calico bag was then tied off and had the sample number written on the outside of the bag. The calico bags were then placed into a polyweave bag with the other samples in that batch.
•The polyweave bag was tied off with a security tag and had the company name, batch number, and sample numbers written on its exterior. Each batch was then placed into a plastic barrel and secured with a cable tie.
•Approximately 1,110 samples were sent to SGS’s Toronto Laboratory (SGS Toronto), inclusive of 64 CRMs. The mass of each sample was approximately 863 g. Preparation of samples was via crushing and then pulverizing 250 g to 85% passing 75 μm. All samples underwent fire assay (30 g charge), analysis conducted by ICP-OES for gold and palladium.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
•Samples of the sulfidic dyke were also assayed for copper via four acid digestion with ICP-OES finish.
•In addition, base metal analysis was conducted by SGS Toronto. Residual pulps from the first pass one metre sampling situated between the top of the Gold Zone and base of the Palladium Zone were re-assayed for multi-element geochemistry.
•The remaining three-quarter core was shipped to Perth, Australia where second pass sampling was conducted at the Platina head office. The 0.2 m half BQ core samples were then selected in the anomalous zones and analyzed for gold, platinum, and palladium only. A magnetic susceptibility measurement was taken every metre using a Fugro KT-9 magnetic susceptibility meter prior to the samples being placed into individual sample bags.
•All samples were then crushed and pulverized, with 100 g per sample placed into sachets. These samples had an average mass of approximately 245 g.
•The half core second pass samples were then sent to ALS’s Brisbane laboratory (ALS Brisbane) for preparation. ALS Brisbane also performed specific gravity measurements for every fifth sample, via the whole rock Archimedes method.
•Once the prepared samples were received from ALS Brisbane, they were divided into batches and sent to Genalysis for analysis.
•A total of 782 pulps (inclusive of 157 CRMs and blanks) were sent to Genalysis. All samples underwent nickel collection fire assay (50 g charge), analysis conducted by ICP-MS.
•A total of 31 pulps were sent to SGS’s Townsville Laboratory (SGS Townsville). The samples were duplicates and represented 5% of the overall sample population. The pulps were analyzed using lead collection fire assay with a 50 g charge.
•A total of 625 samples of 20 cm halved drill core were sent to ALS for preparation and specific gravity measurements. The samples were crushed and then pulverized to 85% passing 75 μm. For each sample, 100 g of material was split off and placed into sachets. Every fifth sample was tested for specific gravity and every twentieth sample was duplicated.
8.1.7 2011 – Platina Resources Ltd.
•Sampling occurred through the Triple Group at 1.0 m intervals for each drill hole (except holes PRL11-56A, B, and C).
•Core was split on site using a diamond saw. One half of the core was subsequently split in quarters.
•Each quarter sample was placed into a calico bag, along with an aluminum tag designating the sample number. The calico bag was then tied off and had the sample number written on the outside of the bag. The calico bags were then placed into a polyweave bag with the other samples in that batch.
•The polyweave bag was tied off with a security tag and had the company name, batch number, and sample numbers written on its exterior.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
•Each batch was then placed into a plastic barrel and secured with a cable tie.
•All samples were sent to SGS Toronto. A total of 1,198 samples were sent for analysis, inclusive of 66 CRMs and 34 blanks.
•Preparation of samples was via crushing and then pulverizing 250 g to 85% passing 75 µm to produce a 30 g charge for fire assay.
•All samples underwent fire assay (30 g charge), analysis conducted via sodium peroxide fusion with ICP-OES for gold and palladium, ICP-MS for the remaining 51 elements.
•Samples of the sulfidic dyke were also assayed for copper via four acid digestion with ICP-OES finish.
8.1.8 2020 - SLR Resampling Program
•A total of 1,094 half-core samples, exclusive of QC samples, were taken from nine 2011 drill holes.
•Core was resampled at SLR’s office/warehouse in Dublin, Ireland, and shipped by courier to the independent ALS Loughrea assay laboratory in Galway, Ireland (ALS Galway) which is ISO17025 certified.
•Core was split using a diamond saw.
•Preparation of samples was via fine crushing to 70% passing 2 mm, and then pulverizing to 85% passing 75 µm for fire assay and ICP-AES analytical procedures.
8.1.9 2021 - MPM
•Half core was cut by geologists using four electric saws with diamond blades. The same side of the core was cut along the sampled length of the hole, and cuts were also performed normal to the core axis to ensure that most were exactly 25 cm long and weighed approximately 600 g. Sample-side core was then inserted with the sample tag into a labelled bag. Samples were then lined up in neat rows on the tables adjacent to the saw stations, zip-tied for security, cross-checked against sample control sheets, and placed into larger bags in bins of 30 samples, which were weighed to ensure the weight did not exceed 22 kg. Most of the cumulate bags weighed approximately 20 kg. The cumulate bags each were clearly labelled with metadata on the outside of the bag, a waybill was inserted for the laboratory, and a copy of the waybill was retained for MPM records.
•MPM produced written procedures to ensure consistency in sample preparation and analysis.
•A total of 10,098 samples, including 9,770 drill core and 498 channel samples, were collected.
•All drill core samples were 0.25 m in length and were weighed to ensure that they met a minimum weight of 0.6 kg; however, 91% of the samples resulted in weights above 0.6 kg. Channel samples averaged approximately 2.5 kg.
•All channel samples were between 0.25 m and 1.0 m, with an average of 0.5 m.
•Sample numbers were defined using pre-numbered sample books and tags to record the date, core size, hole number, sample type, sample depth, and logger’s name. This information was divided into separate parts which were retained in the sample book and stapled into the core tray at the bottom of the sample.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
•The core was cut in half using a diamond saw, with one half retained in the core box. The other half is placed into a sample bag along with a sample tag showing only the sample number, and then closed with a zip tie.
•All samples were submitted for analysis at ALS Galway following the chain of custody outlined in section 11.2.3 of this Technical Report.
•Samples were submitted for preparation via fine crushing to 70% passing 2 mm, and then pulverizing to 85% passing 75 µm.
•Following preparation, samples were analyzed for PGEs by 50 g fire assay (PGM-ICP24) and multielement analysis using four-acid digest with ICP-AES finish (ME-OG62).
•Approximately every fourth sample was submitted for analysis of specific gravity using the weight in air/weight in water method (OA-GRA08/OA-GRA08a), either dry (95% of samples) or paraffin wax coated (5% samples).
•SLR understands that due to long turnaround times at ALS Galway, samples were often prepared at independent laboratories; ALS, Bor, Serbia or ALS Rosia Montana, Romania, and that some analyses were completed at ALS Lima, Peru.
The QP is of the opinion that the workflows and practices described in this section are sufficient to support an updated Mineral Resource estimate.
8.2 Quality Assurance and Quality Control
SLR has collated the following details with respect to QA/QC procedures through the history of the Skaergaard drill database. The QA/QC programs included submission of blank material, certified reference materials (CRM, or standards), and duplicates.
The regular submission of blank material is used to assess contamination during sample preparation and to identify sample numbering errors. Results of the regular submission of CRMs are used to identify issues with specific sample batches and long-term biases associated with the regular assay laboratory. Duplicates are used to calculate the field, preparation, and analytical precision.
8.2.1 1989 – Platinova Resources Ltd.
•No record of Platinova QA/QC protocols.
•Laboratory QA/QC involved the use of internal laboratory standards, including CRM and replicates, as part of the in-house procedures.
•Field duplicates were not taken.
•Approximately 140 duplicates (second pass sampling) were submitted to a secondary laboratory for umpire analysis.
8.2.2 1990 – Platinova Resources Ltd.
•No record of Platinova QA/QC protocols.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
•Laboratory QA/QC involved the use of internal laboratory standards, including CRMs and replicates, as part of the in-house procedures.
•Two field standards were inserted, while 2,300 samples were sent to secondary laboratories (XRAL and Cominco) for umpire analysis.
•Initial errors were flagged by Bondar-Clegg assays for gold analyses at their laboratory. Bondar-Clegg reanalyzed samples containing >2 ppm Au and provided the adjusted figures in the final assay reports.
8.2.3 2003 – Gryphon Metals Corp.
•No record of Gryphon’s QA/QC protocols.
•No blanks or CRMs were inserted.
•Approximately 13.5% of all samples were sent to a secondary laboratory (ACME Analytical Laboratories Ltd. (ACME), Vancouver) for umpire analysis (27 from Pd5 and 34 from WD03-01).
a.Differences were noted in palladium, TiO2, and Fe2O3 concentrations from the original and umpire laboratory.
•The analyses used were under-reported values when compared to those from the umpire laboratory.
8.2.4 2004 – Skaergaard Minerals Corp.
•Two sets of standards were used in the analytical process.
•Both were randomly placed in each sample sequence at intervals of 10 to 20 samples. In addition, every 20th sample was routinely reanalyzed (twice) to check the repeatability of individual results. No bias was evident.
•Laboratory QA/QC involved the use of internal laboratory standards, including CRMs and replicates, as part of the in-house procedures.
•A total of 34 analyses of the standard for gold (0.1 ppm Au), platinum (0.4 ppm Pt), and palladium (2.2 ppm Pd) gave relative standard deviations of 13%, 6%, and 4%, respectively.
•The second standard was an internal laboratory standard to verify instrumentation and calibration.
•Blanks were run as part of the laboratory's internal QA/QC program.
8.2.5 2008 – Platina Resources Ltd.
•A comprehensive QA/QC procedure was implemented by Platina.
•An independent consultant was present throughout the drill program to verify significant intersections.
•During first-pass sampling, only in-house OMAC control standards were used.
•For the second pass sampling, two laboratories were used, one for preparation and one for analysis to ensure “blindness”.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
•At the second laboratory (Genalysis) samples were divided into batches, consisting of 20 samples per batch. Each batch was randomly inserted with four control samples, a gold standard, a field blank, a field standard, and a duplicate. The laboratory also used internal standards and blanks.
•DDH had duplicates taken from the quarter core.
•Umpire laboratory campaigns with two other laboratories were carried out as independent checks of the assay results at a ratio of 1 in 20.
•CRMs, having a good range of values, were inserted blindly and randomly. Results indicated that sample assay values were accurate and reliable.
•The DDH core pulp duplicates had more than 90% of the pairs with differences (half absolute relative differences or HARD values) below 10% (Au, Pd) and these results indicated very good precision and a low nugget effect.
8.2.6 2010 – Platina Resources Ltd.
•A more comprehensive QA/QC procedure was implemented by Platina.
•Two custom CRMs were manufactured by Geostats Pty Ltd (Geostats), Australia. The reference materials are certified and manufactured from Skaergaard bulk sample material collected from outcropping Gold and Palladium Zones in 1990.
•The samples sent to SGS Toronto for first pass sampling were inclusive of CRMs and blanks supplied by Platina. In addition, in-house SGS control standards were also used.
•Samples were sent in batches of 72 as this correlates with the size of SGS’s fire assay batch. Within each batch of 72 samples, there were three CRMs and one blank, along with an additional 12 QC samples supplied by SGS.
•Second pass sampling used three laboratories: one for sample preparation, another for sample analysis, and a third for duplicate analysis.
•Once the prepared samples were received from ALS, they were divided into batches of 20, four samples per batch being QC material (one blank and three CRMs), and sent to Genalysis. One duplicate per batch of 20 (5%) was sent to SGS Townsville for precious metal analysis. The precise number of control samples provided by Genalysis is unknown.
•CRMs, having a good range of values, were inserted blindly and randomly. Results indicated that sample assay values were accurate.
•The DDH core pulp duplicates had more than 90% of the pairs with differences (half absolute relative differences or HARD values) below 10% (Au, Pd) and these results indicated very good precision and a low nugget effect.
8.2.7 2011 – Platina Resources Ltd.
•A total of 1,198 samples were sent for analysis, inclusive of 66 CRMs and 34 blanks.
•Samples were sent in batches of 74 as this correlated with the size of SGS’s fire assay firing batch.
•Each batch of 74 samples included three CRMs and one blank, in conjunction with an additional 12 QC samples supplied by SGS.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
•A blank was always placed at the start of each hole, while the CRMs were inserted randomly.
•Two holes were twinned: PRL11-53 (twin of D90-13) and PRL11-55 (twin of PRL10-41.)
•The results from the twinned holes confirmed the initial intersection assays.
•PRL10-41, which was drilled in 2010, returned no anomalous precious metal values even though the correct Triple Group lithologies were intersected. PRL11-55 encountered typical gold and palladium Zone mineralization.
8.2.8 2020 – SLR Resampling of 2011 Drilling
•A total of 1,318 samples were sent for analysis, including 150 CRMs and 71 blanks.
•Samples were sent in batches of 137 to 242 samples, inclusive of QC sampling.
•Five CRMs variably covered gold, palladium, platinum, silver, nickel, copper, cobalt, iron, and sulfur.
•Blanks were inserted every 10 to 20 samples, with two to four different CRMs inserted between the blank samples.
•Core recovery and density measurements were taken. Core recovery averaged approximately 100%.
•Blanks demonstrated no evidence of contamination for gold and platinum, except for one blank failure with a 0.049 g/t Au assay. Palladium grades in blanks exhibited more variation, though only a few displayed more than ten times the DL of 0.001 g/t Pd. Only two blanks graded more than 0.025 g/t Pd with a maximum of 0.037 g/t Pd. SLR considers this to be an acceptable result, given the palladium grade in the mineralized horizons.
•SLR analyzed CRMs CDN-PGMS-30, CDN-GS-P4J, CDN-ME-1207, CDN-ME-1309, and CDN-GS-1X for palladium, gold, and platinum. Assay results were generally less than one standard deviation from the expected mean value, with only two failures. SLR considers this to be an acceptable result.
•SLR examined the original 2011 assay results against the 2020 resamples, both globally and by mineralized horizon, and found that the mean values and standard deviations were very close between the two populations.
•SLR selected 102 coarse reject and 103 pulp duplicates from the resampling and submitted these for analysis at ALS in 2021 during the 2021 field season. Gold, platinum, and palladium values for the duplicates were compared to the resampled values.
a.Assay values, for gold, platinum, and palladium for the coarse reject duplicates show good agreement, with most samples plotting close to the x=y line with only a limited number of outliers (Figure 8-1). For all elements, there is a slight low-grade bias with the duplicate (2021) assays returning slightly lower average values than the primary assays.
b.Assay values for platinum, and palladium for the pulp duplicates show good agreement with most samples plotting close to the x=y line with only a limited number of outliers (Figure 8-2). For gold, samples plot close to the x=y line, however, there may be a minor low-grade bias, with the duplicate assays (2021) returning lower average values than the primary assays. Note that most gold grades are very low, in the 0.01 g/t to 0.05 g/t range.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 8-1: Gold Assays (log normal) for Coarse Reject Duplicate Samples (2020 Resampling)
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 8-2: Gold Assays (log normal) for Pulp Duplicate Samples (2020 Resampling)
8.2.9 2021 MPM
QA/QC procedures for the 2021 field program were documented by MPM.
A total of 12,022 samples were submitted for analysis including 10,268 drill hole and channel samples along with 557 blanks, 555 CRMs, 205 field duplicates, and 226 coarse reject duplicates (Table 8-1).
Table 8-1: Summary of QA/QA Sample Types and Insertion Rates
| | | | | | | | |
| Sample Type | Planned Rate | Actual Rate |
| CRM | 5% | 5% |
| Blank | 5% | 5% |
| Field Duplicate | 2% | 2% |
| Coarse Reject Duplicate | 2% | 2% |
QA/QC sample results were monitored on an ongoing basis and any issues identified were promptly raised with the assay laboratory.
8.2.9.1 Blanks
Blank material was purchased from CDN Resource Laboratories Ltd., Canada (CDN) as 400 g packets of coarse rock chips.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Analysis of the blank assays demonstrated no significant contamination for gold, platinum, or palladium. Only one palladium sample recorded a value slightly higher than the warning limit set at ten times the DL of 0.001 g/t Pd (Figure 8-3).
Figure 8-3: Palladium Assays for Blank Samples
CRMs were also purchased from CDN and were provided in 100 g packets. Table 8-2 summarizes the certified values, source materials, and uses.
Table 8-2: Summary of CRMs
| | | | | | | | | | | | | | | | | |
| Reference Material | Certified Value (g/t) | Source | Use |
| Au | Pt | Pd |
| CDN-PGMS-30 | 1.897 | 0.223 | 1.66 | Miscellaneous ores | High grade Au and Pd, low grade Pt |
| CDN-ME-1207 | - | 0.568 | 0.992 | Ni Ore, Canada | Mid-grade Pt and Pd |
| CND-ME-1309 | - | 0.707 | 0.363 | Sulfide mineralisation, Canada | High grade Pt and low grade Pd |
| CDN-GS-1X | 1.299 | - | - | Polymetallic sulfide mineralisation | High grade Au |
| CDN-GS-P4J | 0.479 | - | - | Low grade Au ore, Cu-Au porphyry | Low grade Au |
•For CDN-PGMS-30, 60% to 75% of gold, platinum, and palladium assays were within one standard deviation (1SD) of the reference value with only two or three values outside the failure limit, set at plus or minus three standard deviations (+/-3SD) from the reference mean. For all elements, the mean analyzed value is very close to thereference value and no significant systematic bias was noted. Figure 8-4 shows a Shewhart plot for CDN-PGMS-30 palladium results.
•For CDN-ME-1207, approximately 75% of platinum and palladium assays were within 1SD of the reference value, however, there were up to nine values (up to 9% of the total) below -3SD. Figure 8-5 shows a Shewhart plot for CDN-ME-1207 palladium results.
•Table 8-2 indicates that this CRM is derived from nickel ore rather than from PGE mineralization. Although the platinum and palladium values are suitable for the PGE mineralization at Skaergaard, the CRM contains significantly higher nickel (approximately 1.5% Ni) and higher chromium (approximately 2.0% Cr) values than the mineralization at Skaergaard.
a.On investigation, it was noted by the laboratory that the high nickel and chromium content in the CRMs caused poor fusion during fire assay resulting in low recovery of platinum and palladium in some instances. This did not impact the drill core samples as the values of nickel and chromium are significantly lower than in the CRM.
•A selection of the failed CRMs was reanalyzed along with ten surrounding samples, taking into account the higher nickel and chromium values when preparing for fire assay. In all cases, the repeat CRM value was close to the reference value and the repeated drill core sample assays were within the expected tolerance. Based on this information, SLR concludes that the failures noted in this instance result from the choice of CRM rather than any bias in the analytical technique.
a.The SLR QP recommends that an alternative mid-grade platinum and palladium CRM with a more appropriate matrix be sourced for future drill programs.
•For CDN-ME-1309, 71% of platinum and 65% of palladium values were within 1SD of the reference value, however, there were up to seven values (6% of the total) outside +/-3SD. Figure 8-6 shows a Shewhart plot for CDN-ME-1309 palladium results. Despite these failed samples, the mean analyzed value is very close to the reference value and no significant systematic bias was identified for either element.
•Approximately 50% of gold values for CDN-GS-P4J (L – Au) fall within 1SD of the reference value and approximately 5% of values are outside +/-3SD (Figure 8-7). Despite this wider spread of gold values, the analyzed mean is very close to the reference mean and no systematic bias has been identified.
•Approximately 50% of gold values for CDN-GS-1X (H – Au) fall within 1SD of the reference value and approximately 3% of values are outside +/-3SD (Figure 8-8). Despite this wider spread of gold values, the analyzed mean is very close to the reference mean and no systematic bias has been identified.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 8-4: Palladium Assays for CRM CDN-PGMS-30
Figure 8-5: Palladium Assays for CRM CDN-ME-1207
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 8-6: Palladium Assays for CRM CDN-ME-1309
Figure 8-7: Gold Assays for CRM CDN-GS-P4J (L – Au)
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 8-8: Gold Assays for CRM CDN-GS-1X (H – Au)
8.2.9.2 Duplicates
Field Duplicates
A total of 205 field duplicates were collected and submitted to ALS Galway for analysis. Field duplicates were collected by submitting the second half of the drill core with a new sample number in the same batch as the primary sample.
Analysis of the assay results for the field duplicates shows very good agreement between the primary sample and duplicate sample assays for gold, platinum, and palladium. The mean grades and standard deviations for each element are also closely comparable.
For example, Figure 8-9 shows a comparison of the primary and duplicate palladium assays for the field duplicates. There is very close agreement for all but one sample, which is likely to be a mislabelled sample. The mean grade of the primary samples is 0.35 g/t Pd, the mean grade of the duplicate samples is 0.34 g/t Pd, and the correlation coefficient (R) for the two data sets is 0.99, which also indicates a strong relationship between the two datasets.
Good agreement between the gold, platinum, and palladium field duplicate assays also indicates low levels of short scale grade variation within the mineralization.
Coarse Reject Duplicates
A total of 226 coarse reject duplicates were submitted to ALS for analysis. The duplicates were taken from the coarse crush during sample preparation at ALS.
Analysis of the assay results for the laboratory duplicates shows very good agreement between the primary sample and duplicate sample assays for gold. Agreement between the primary and duplicate sample assays for platinum and palladium is also good, although there are a small number of outliers. The mean grades and standard deviations for all elements are closely comparable.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
For example, Figure 8-10 shows a comparison of the primary and duplicate palladium assays for the laboratory duplicates. There is very close agreement apart from a small number of outliers; the mean grade of the primary samples is 0.26 g/t Pd, and the mean grade of the duplicate samples is 0.25 g/t Pd. The correlation coefficient (R) for the two datasets is 0.87, a value which indicates a good correlation but is impacted by the small number of outliers.
Figure 8-9: Palladium Assays (log scale) for Field Duplicates
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 8-10: Palladium Assays (log scale) for Coarse Reject Duplicates
8.3 Sample Security
8.3.1 1989 and 1990 – Platinova Resources Ltd.
•Samples are assumed to have been subject to the Platinova Corona JV chain of custody.
8.3.2 2003 – Gryphon Metals Corp.
•The plastic pails containing the drill and channel samples in the plastic pails travelled by boat to the airport in Iceland.
•Transportation from Iceland to Vancouver was by commercial airline carrier, Iceland Air, to New York and then by bonded truck to Vancouver.
•Company personnel were present when the samples where sealed in Greenland, and again when they were received in Canada.
8.3.3 2004 – Skaergaard Minerals Corp.
•Once samples were delivered to aircraft at site, they were then in the hands of bonded agents who tracked the samples to their final destination.
•All sampled drill core was shipped to Vancouver for further detailed sampling.
8.3.4 2008 – Platina Resources Ltd.
•Chain of custody was managed by Platina.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
•All first pass (quarter core) sample batches were freighted to Reykjavik by twin otter and then freighted to OMAC, in Ireland.
•The remaining three-quarter core was shipped to Perth, Australia where second pass sampling of half core was conducted at the Platina head office in Australia.
•Second pass samples were sent to SGS Perth for preparation. Once the prepared samples were received from SGS Perth, they were divided into batches and sent to Genalysis for analysis.
8.3.5 2010– Platina Resources Ltd.
•Chain of custody was managed by Platina.
•First pass quarter core sample batches were freighted to Reykjavik by Twin Otter and then freighted to SGS Toronto.
•The remaining three-quarter core was shipped to Perth, Australia where second pass sampling of half core was conducted at the Platina head office in Australia.
•The half core second pass samples were then sent to ALS Brisbane for preparation. Once the prepared samples were received from ALS, they were divided into batches and sent to Genalysis. One duplicate per batch was sent to SGS Townsville.
•The remaining quarter core has been stored in a secure lock-up in Perth.
8.3.6 2011 – Platina Resources Ltd.
•Chain of custody was managed by Platina.
•First pass quarter core sample batches were freighted to Reykjavik by Twin Otter and then freighted in a sealed shipping container to SGS Toronto.
•The remaining three-quarter core was stored in a secure lock-up in Reykjavik.
8.3.7 2021 - MPM
•Chain of custody was documented and managed by MPM.
•Individual sample bags were placed into larger rice bags which were marked with the batch number and closed with a zip tie.
•The sample numbers and the number of samples within each rice bag were recorded along with the bag weights.
•These larger rice bags were then placed into larger bulk bags for shipping.
•The sample numbers, number of samples, batch numbers, and number of batches in each bulk bag was recorded and the weight calculated.
•Due to the remote nature of the Project, samples were stored at site until the end of the field program when they were transferred to Iceland via chartered ship, and then onward to the analytical laboratory in Ireland via Denmark.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
8.4 SLR QP Comments
In 1990, a study by WGM determined that one-third core samples could correctly represent the mineralization at Skaergaard based on the style of mineralization (fine grained sulfides), however, a lower relative error could be achieved at much greater cost by increasing subsample weight. Platina later conducted a review of duplicate data results which indicated that BQ quarter core samples adequately represented the style of mineralization present at Skaergaard.
In the QP’s opinion, typically third or quarter core-based assays on BQ and NQ core may not provide sufficient volume to be considered reliable for use in a Mineral Resource estimate. The QP recommends that half core be sampled in one pass in all future exploration, at 25 cm intervals.
In the QP’s opinion, QA/QC programs as designed and implemented by the historical companies were based on industry standard practice when undertaken.
The QP has reviewed the QC reports for the 2004, 2008, and 2010 drilling, and 2020 resampling, and did not identify any issues that would materially affect the Mineral Resource estimate. Standards were generally in accord with the expected values, and occasionally exhibited low bias. Blanks did not exhibit significant or persistent contamination. Approximately 90% of the field duplicates exhibited differences of less than 15% overall. In the QP’s opinion, the sample preparation, analysis, and security procedures at Skaergaard met industry standards at the time.
In the QP’s opinion, the QA/QC program implemented for the 2021 field program meets industry standard practice, and no significant contamination or bias was identified. The QP recommends, however, that for future drilling programs, the current CRMs be reviewed to ensure that the sample matrix is suitable for the mineralization at Skaergaard.
The QP is of the opinion that the current sample preparation, analysis, and security procedures at Skaergaard meet industry standards and the drill hole database is acceptable to support the Mineral Resource estimate.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
9.0 Data Verification
9.1 Pre-2011 Verification
9.1.1 Database Verification Procedures
Historical data for Skaergaard have been variably recorded and compiled into various media including paper reports, printed tables, MS Excel files, Datashed databases, and MS Access databases.
SLR received the drilling database, up to and including the 2011 drilling, in MS Access database format, within a data package that was exported by WAI after their 2013 resource estimate. Although in a database format, MS Access databases are not secure and do not contain cross-reference procedures to remove errors. In the QP’s opinion, the pre-2011 database should be incorporated into an industry standard database that supports these validations and previous logged data should be cross checked to ensure it is correct.
9.1.2 Independent Audits
9.1.2.1 1989 – Platinova Resources Ltd.
•No audits or reviews were completed.
9.1.2.2 1990 – Platinova Resources Ltd.
•In 1991, the Platinova Corona JV requested a review of the quality of assays particularly for gold from Bondar-Clegg.
•Following a review of assaying and sampling techniques from all laboratories, the Bondar-Clegg report found no significant differences between the laboratories and stated that correlation between the laboratories was fair to good.
•A 1990 study by WGM recommended that fire assaying with gravimetric finishes should be completed on second pass sampling. WGM also determined that one-third core samples could represent the mineralization at Skaergaard based on the style of mineralization (fine grained sulfides), however, a lower relative error could be achieved at much greater cost by increasing subsample weight.
9.1.2.3 2003 – Gryphon Metals Corp.
•Gryphon compiled the report "Analyses of samples taken during 2003 Skaergaard field season" in February 2004. The results of duplicate assays between original and umpire laboratories were confirmed in this report.
9.1.2.4 2004 – Skaergaard Minerals Corp.
•An internal audit was undertaken by SMC, and two external audits were conducted by Dermer and SRK.
•RPA carried out limited validation and verification of the data by comparing the assays in the database with written records. Approximately 30% of the 2004 data and 25% of the 1990 data were checked in this manner and no errors were found. RPA also applied the database validation utilized in Gemcom GEMS software to check for missing or nestedintervals and also found no errors. In RPA’s opinion, the database was reasonably free of errors. RPA noted, however, that lithological information capture was only partially complete and recommended that the remaining lithological data be entered into the database.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
9.1.2.5 2008 to 2012 – Platina Resources Ltd.
•Platina validated the drill hole database in 2011 and an internal system audit was undertaken in 2012.
•SRK reviewed the sampling techniques, however, these do not match the procedures outlined in the Platina annual report. It appears that Platina incorporated SRK’s recommendations in the sample analysis stage.
•A review of the sampling techniques and data was carried out by Snowden as part of the 2012 resource estimate and the database was considered to be of sufficient quality to carry out resource estimation.
•WAI reviewed the data and concluded it was suitable for insertion into a mineral resource estimate.
9.1.3 Drill Hole Data Validation
In September 2020, SLR utilized Micromine 2020 to recompile the Skaergaard drill hole database. The WAI 2013 drill hole database was used as a basis for this study. Micromine has a number of integral data validation steps to ensure that the drill hole database is free of inconsistences.
SLR noted that the following drill holes are missing downhole survey information:
| | | | | | | | |
| PRL11-50 | PRL11-51 | PRL11-52 |
| PRL11-53 | PRL11-54 | PRL11-55 |
| PRL11-56 | PRL11-56A | PRL11-56B |
| PRL11-56C | PRL11-57 | PRL11-58 |
| PRL_08_38 | | |
In addition, PRL11-49 contains only one survey measurement at 364 m depth. SLR identified five drill holes that have reported missing downhole surveys at the collar.
Two drill holes (PRL10-46 and PRL-48) were found to have downhole deviations that exceeded 0.5°/m.
SLR notes that the assay database consists of a combination of quarter core and half core samples, which overlap.
9.1.4 Assay Certificate Verification
SLR notes that original historical assay certificate information is incomplete due to poor record keeping by previous owners of the deposit. SLR was able to locate the following information:
•1988 certificate scans from the back of an annual report.
•1989 log assay summaries extracted from Appendix B of a report.
•1990 scanned Bondar-Clegg assay certificates are mostly illegible dot-matrix type prints. 1990 XRAL certificates are legible.
•2004 assay certificates are scanned and legible (ACME). The 2004 diamond drill program assay certificates were received on April 14, 2011.
•2008–2010 assay certificates from Platina drilling were available.
The QP’s verification work found that 1989 drilling sample IDs were not entered into the DDH database. The sample IDs for this year were instead stored as a concatenation of ‘hole_ID’, ‘_from’ and ‘_to’. Consequently, the SLR QP was unable to verify the assay results in the database for the 1989 drilling.
SLR performed optical character recognition (OCR) and clean-up work on the raster assay certificate data from 1990 and 2004. The 1990 work was inconclusive and only yielded two matches. At first, SLR matched only 60 of the 1,155 ACME 2004 assays and found no mismatches. The verification work for this data was impeded by variable changes to sample ID nomenclature in the Mineral Resource database, compared to the original assays. For example, the 2004 ACME sample IDs begin with a ‘C’ prefix in the certificates. Cross-checks in the Mineral Resource database revealed that the prefix had been removed from the sample ID. SLR then judiciously concatenated the prefix to a copied column of the sample IDs for D-04 holes in the certificate sample range and matched 896 assays. Only two of the matches showed significant differences in gold grade and are likely re-assays. Only three assays showed Pd discrepancies exceeding 0.1 g/t. Only 10 Pt assays differed more than 0.1 g/t.
The compiled 2008 Genalysis certificates showed 200 matches of 250 certificate assays, with only five discrepancies, which were set to a lower 1 g/t Au in the Mineral Resource database. No discrepancies were found in 200 Pd assay certificate matches.
9.1.5 Site Visits
A site visit was carried out by the SLR QP on July 25 and 26, 2011, after the drill season had finished and samples were packed and ready to transport to Iceland via ship. Another site visit was undertaken by an SLR Consultant Geologist on September 9, 2020. Personal communication between the SLR QP and the Geologist confirmed that the observations were in accord with those of the QP.
During a site visit on September 20, 2020, an SLR Consultant Geologist reviewed the lower altitude levels of the licence area adjacent to the coast in the likely site of any potential future infrastructure and port. Both the QP and the SLR Consultant Geologist visited the camp, air strip, core storage, and core cutting facilities. The SLR Consultant Geologist reviewed core from previous drilling campaigns; however, core boxes containing mineralized samples have been removed from the site. The SLR Consultant Geologist also reviewed a series of mineralized intercepts from the 2011 Platina drilling program that were stored offsite at a facility in Reykjavik, Iceland.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
During the 2011 site visit, the SLR QP visited the camp, airstrip, core logging, core cutting, and core storage facilities (Figure 9-1). The QP was also taken via helicopter to visit a drill collar, a representative channel sample, and to view the Triple Group horizons from the air. The QP also reviewed the core logging and sampling workflows and checked a log against the hole in the field. Further, the QP reviewed the sample security, transport workflows, and temporary storage in Isafjordur, Iceland. The QP made the following observations during the site visit:
•The QP was flown out to an example of a drill collar (PRL11-60). The site was clean and free of debris. Geologists laid out the hole with a handheld compass and left a line of flagging tape to help the drill align the mast. The hole was marked via spray paint on the nearest outcrop.
•The QP was flown out to two channel sample sites just northwest of the terminus of the Forbindelses Glacier. The channels were sawn approximately 8 cm wide in two rows: one for reference and the other for sampling.
•The QP visited the core logging and storage facilities at Skaergaard. The logging facility is a small shack adjoining the utility shack. Four geologists systematically logged the core in two rows. The first geologist marked the core and performed geotechnical work, the second logged lithology. The DDH core was set aside into two separate cross-stacks: one for the Triple Group samples and the other for the remaining holes. The Triple Group core was bound with packing tape and straps for shipment to Robina, Australia, to join the rest of the Platina-drilled mineralized intercepts.
•One metre samples were cut using two lightweight diamond rock saws which were affixed to wooden tables. One metre samples were cut in half on one side of the core, magnetic susceptibility measurements were taken on the flat surface of the cut face, and samples were placed into calico cloth bags with cloth ties, each with a metal tag inside.
a.Seventy-four cloth sample bags were packed into larger poly basket weave bags and sealed with plastic ties. Seventy-four samples equated to one batch of samples at SGS laboratories, including the laboratory’s internal QA/QC samples.
•Platina used seven standards and a blank in its QA/QC program. Two of the standards were inserted every 20th sample and two were randomly chosen from the remaining pool of five standards. Blanks were inserted every 20th sample and at the beginning of every hole.
a.Each batch of samples was transferred to a blue plastic barrel and then secured with a plastic tie to indicate whether tampering had occurred in transit. The QP observed barrels with these ties both at Skaergaard and in Isafjordur.
b.The drill core left on site comprised various parts of holes from 1989, 1990, and 2008 to 2011, and was in excellent condition. Boxes were neatly cross-stacked and well labelled with either metal strip Dymo or write-on aluminum tags. Only a very small fraction of older tags were torn or missing. Large rocks kept plywood lids in place during high winds.
•Though the QP could not physically examine the Triple Group horizons as they were located on the side of the mountain on a scree slope, the helicopter pilot flew alongside the Triple Group at an approximate distance of 20 m nearly the entire length of the outcrop. The QP observed that:
a.The horizons are extremely uniform in orientation and thickness.
b.The L3 appears to have a gradational lower contact. The two lower L1 and L2 horizons are only a little less identifiable. Perhaps the L2 horizon could be used as an underground marker for grade control.
c.Local undulations in dip are less than 30 cm on average. The largest local undulation in the layering appears to be less than one metre.
d.The L1 and L2 horizons appear to be a series of smaller leucocratic layers that meld together at distance.
e.Dykes were recessive and uncommon in the outcrop north of the glacier. A large dyke was observed dipping perpendicular to the Triple Group.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 9-1: Images from 2011 Site Visit
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
9.2 2021 Verification
9.2.1 Database Verification Procedures
SLR received the current drilling database in MS Access database format. Although in a database format, MS Access databases are not secure and lack cross-referencing procedures to detect and correct errors. In the QP’s opinion, the database should be updated to an industry-standard database that supports drill hole validation.
9.2.2 Resampling Program (2020)
In the QP’s opinion, the quarter core BQ assays used in the WAI 2013 resource estimate may not have had sufficient volume to be considered reliable. Therefore, the SLR QP recommended that all remaining 2011 Platina one-half core samples stored in Reykjavik be relogged, resampled, assayed, and compared with the original quarter-core assay results prior to any Mineral Resource estimation.
In 2020, SLR conducted a resampling program for holes PRL-11-49 through PRL-11-58 to improve confidence in the data from the original quarter-core assays. A plan view showing the resampled holes is presented in Figure 9-2. A total of 1,094 samples were taken and sent to the independent ALS assay laboratory in Dublin, Ireland. The results returned in early 2021
were incorporated into the Mineral Resource database, replacing the original samples. SLR statistical comparisons of the half core assays against the original 2011 quarter core samples, both globally and by mineralized horizon, did not show significant differences in either mean values or coefficients of variation, and confirmed that the quarter core results were reliable.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 9-2: Holes Resampled in 2020
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
9.2.3 Independent Witness Sampling
In 2010 and 2011, Platina’s DDH core sampling practice was to submit quarter core samples along the length of the drill hole in order to receive assay values prior to selecting and submitting half core samples.
During the 2020 site visit, SLR reviewed 2011 Platina core that was stored in a secure storage facility in downtown Reykjavik, Iceland. SLR noted that 225 boxes of NQ core were present in the storage location. Within these boxes were the remaining quarter core and the one-half core. SLR personnel selected three one-half core samples as Independent Witness (IW) check samples and sent these by courier to ALS in Loughrea, Galway, Ireland for sample preparation and analysis. No blanks or CRMs were submitted for assay along with the core samples.
The samples were prepared by crushing to 70% passing -2 mm, riffle splitting off 1.0 kg, and pulverizing the split to over 85% passing 75 µm (PREP-31B). The samples were then assayed by fire assay fusion (FA-FUS03) with an AAS finish (Au-AA25) on a 50 g sample.
Table 9-1 presents the IW sampling results and their respective original sample results for gold, platinum, and palladium.
Table 9-1: 2020 Independent Witness Check Assay Results
| | | | | | | | | | | | | | |
| Hole No. Sample Interval (m) | Sample IDs | Grade |
| (g/t Au) | (g/t Pt) | (g/t Pd) |
PRL11-53 477 to 478 | RPA-SK-001 | 0.117 | 0.165 | 2.35 |
| P110587 | 0.1 | 0.18 | 2.27 |
| Difference | 0.017 | -0.015 | 0.08 |
| 17% | -8% | 4% |
PRL11-55 550 to 551 | RPA-SK-002 | 1.005 | 0.02 | 0.267 |
| P110926 | 1.24 | 0.03 | 0.331 |
| Difference | -0.235 | -0.01 | -0.064 |
| -19% | -33% | -19% |
PRL11-51 237 to 238 | RPA-SK-003 | 3.43 | 0.047 | 0.531 |
| P110195 | 3.81 | 0.05 | 0.546 |
| Difference | -0.38 | -0.003 | -0.015 |
| -10% | -6% | -3% |
9.2.4 Drill Hole Data Validation
In 2022, an SLR Senior Geologist, under the supervision of the QP, used Micromine 2022 to compile the drill hole database for the 2021 drilling program. SLR also conducted a tertiary review of the final MRE database. Drilling data was provided in MS Access database format and assay data was provided in comma-separated value text files directly from ALS laboratory. Both data types were imported into and validated using Micromine.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
SLR notes that some tables in the database were not complete at the end of the field season:
•The collar file was not updated with the final surveyed coordinates of either the drill holes or the channel samples.
•Downhole survey data had not been processed, validated, and imported from the loggers’ data sheets.
•Alteration and mineralization tables were only completed for a very small number of drill hole intervals.
SLR updated the collar coordinates and downhole survey tables using the available raw data. SLR recommends that, for future drilling programs, the database be finalized and validated by field geologists before presentation to SLR.
No significant data errors were noted on import into Micromine.
The compiled 2021 data were appended to the previous 2021 Mineral Resource database in Leapfrog. SLR then exported the new compiled Mineral Resource database from Leapfrog and cross-checked all survey and collar information against historical records in the 2012 database, the 2020 re-assay program, and the 2021 logging database and assay certificates. The QP is of the opinion that the information contained in the Mineral Resource database is of sufficient quality to support the Mineral Resource estimate.
9.2.5 Assay Certificate Verification
9.2.5.1 2021
The QP matched 240 of 311 sample IDs in available SGS certificates from 2010. There were no discrepancies for gold, and palladium showed one discrepancy due to an LDL sample set to 0 in the Project database. There were no certificates which covered platinum.
The QP also verified the ALS resampling of the 2011 drill core. Of the 1,094 sample ID matches between the certificates and the Mineral Resource database (100% matches), eight certificate samples with grade were set to 1 g/t Au in the
database: a result of capping gold grade in material between the mineralized zones. There were no grade discrepancies for palladium.
The QP notes that LDL values have been converted to negative in the original database provided to SLR (e.g., <10 ppb becomes -10 ppb). The QP also notes that gold values were reported from the laboratory in ppb, however, they are stored in the database as ppm. During this conversion from ppb to ppm, the values have been rounded down (e.g., 959 ppb Au becomes 0.95 ppm Au).
9.2.5.2 2022
For the 2021 drilling and channel sampling, the QP matched 10,101 assay certificate CSV sample IDs to those of 10,268 Major Precious Metal assays in the Mineral Resource database, representing 98.3% of the 2021 program. The QP verified palladium, gold, and platinum assays for the 2021 program and found no significant differences.
9.2.6 Site Visit
A site visit was conducted by SLR personnel from August 21 to 29, 2021, during the completion of the most recent drill season. SLR reviewed most aspects of the work, including drill core management, logging, cutting, and sample preparation procedures (Figure 9-3). Images of the Skaergaard gabbro host rock are shown in Figure 9-4.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Field visits to other areas of the deposit included a reconnaissance flight around the upper part of the deposit to view the Triple Group outcrops, an on-foot traverse on the Forbindelses Glacier to view the active drills and survey a selection of completed drill collars, and a visit to active and historic channel sampling areas on an island hosting the Triple Group outcrop. Additional reconnaissance flights and traverses to the west and east of the Forbindelses Glacier were taken to evaluate the topography and suitability for future camp or permanent infrastructure.
The QP visited active drill pads for the Xenix 85 Discovery 1 drills of both sizes, as described in Section 7. All four of the drills were active on the Forbindelses Glacier at the time of the field visit.
To check that the handheld GPS pickups are immaterial to the Mineral Resource estimate, in case Asiaq's survey visit was not carried out due to unforeseen factors, the QP performed a small series of pickups (MPD014, MPD011, MPD008, MPD017, MPD007, PO14, PO65) with the QP’s Garmin 700 GPS to compare positioning relative to MPM's Garmin eTrex 10 GPS and the SLR Consultant Engineer’s Garmin eTrex 20 GPS. For four holes where all three devices were used simultaneously, the QP found that all three Garmin GPS devices showed coordinates within 5 m of each other and within 10 m of the planned hole coordinates. All seven positions picked up with both the SLR Consultant Engineer’s and the QP’s devices were within 5 m of each other.
The QP is of the opinion that the drilling, surveying, core collection, transport, logging, sampling, QC controls, and security all meet industry standards and are of sufficient quality to support a Mineral Resource estimate. The QP was impressed with the organization and expertise of both the geological and drill crews and the overall quality of the work. For the next drill program, the QP recommends that a separate geotechnician supervise and coordinate collar and downhole surveys to ensure accurate and timely results are gathered, and to avoid any issues in the field with survey equipment or data transfer.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 9-3: Images from 2021 Site Visit
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 9-4: Skaergaard Images: Gabbro
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
| | | | | |
| 9.2.6.1 | Dyke Reconnaissance |
The QP and a MPM geologist performed a rudimentary dyke investigation around the Skaergaard camp to attempt to quantify the orientations, thicknesses, and abundance of barren dyke material penetrating the Skaergaard mineralized horizons. Dykes were located during a day traverse; the QP would pace off the thickness and then walk the centreline of the dyke marking several points on the GPS, taking frequent pictures (Figure 9-5). The MPM geologist measured the dip direction and dip of the dyke margin, which was then recorded in Fieldmove Clino.
The QP notes that the primary dyke orientation and thicknesses run approximately east-west, and the secondary orientations run approximately north-south in a perpendicular fashion. These dykes show extensive continuity and persistent thicknesses in both vertical and lateral dimensions, and crosscut the leucocratic L0-L3 horizons in outcrop north of the Forbindelses Glacier. From the field camp, one can observe the east-west population traversing the entire mountain slope south of the glacier. Occasionally, thin light-coloured granophyre dykes may intrude the darker dolerite dyke material.
The QP is of the opinion that the camp area likely over-represents barren dyke material, which may in part explain the lower camp elevations. However, the QP also estimates that barren dykes penetrated approximately 5% to 10 % of the material overall. The QP recommends a mapping program across the Skaergaard Intrusion to quantify dyke material and facilitate solid modelling. The QP also recommends investigating the use of drones and geolocated aerial photos to facilitate mapping.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 9-5: 2021 Site Visit: Dyke Reconnaissance
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
9.3 SLR QP Comments
The QP is of the opinion that historical database verification procedures for the Skaergaard Project comply with industry standards. The QP recommends, however, that GRML migrate the Skaergaard database to an industry-specific database, such as acQuire or GeoBank, to ensure that current and future data is secure, backed up, auditable, and examined using powerful in-built cross-validation procedures. As part of the database upgrade, the QP also recommends that the quarter core assays be extracted from the current assay dataset and stored in a separate table.
In the QP’s opinion, the state of the historical information reflects both the technological and financial realities of a project that began before computing became the industry standard and changed hands several times, with the loss of paper and personnel information at each iteration. Post-2008 drilling data is of much higher quality and tends to supersede older drilling data. The QP also notes that the 2010 and more recent information covers most of the deposit's main volume, and that many of the older holes are located in the southern portion of the deposit, where the mineralization is much deeper.
The QP concludes that the 2020 resampling program results for palladium, gold, and platinum are of sufficient quality to support Mineral Resource estimation as incorporated into the Mineral Resource database. The QP notes that statistical analyses showed results close to those of the original assays, suggesting that grades are fairly uniform and repeatable.
The QP concludes that the independent witness samples have confirmed the presence of gold, platinum, and palladium at levels comparable to those of the original samples.
Overall, verification of the assay certificates still in the historical records was successful. Verification of 2021 assays shows no significant differences between the assay certificates and the Mineral Resource database in Leapfrog. The QP recommends that GRML do an exhaustive search for more assay certificates, including in various internal report appendices, then collate all available assay source records into one folder and carry out a full audit of the historical sample ID and grade information contained in the Project database, ensuring that certificate records exactly match those of the database. The QP recommends storing the original UDL and LDL values (<# and >#) in raw entry fields that match the certificates, and then storing replaced or reassayed numerical values in a ‘best’ field such as ‘pd_ppm_best’, using half of the lower detection limit for LDL assays, an upper detection limit + 0.0001 for UDL assays with no second assay using a different method.
The QP notes that the incorporation of multi-element assays into the Mineral Resource database is not yet completed. The QP recommends incorporating these results into Leapfrog to conduct internal studies and determine correlations with other elements.
Finally, the QP recommends that GRML perform a full database compilation from the various format source components, and then migrate the datasets to an industry-standard geological information management database system prior to the next Mineral Resource estimate. All available density results should be compiled in a separate table which includes the sampled proportion of the core, the sample weights where recorded, the measurement method, and the date.
Overall, the QP is of the opinion that the Mineral Resource database is of sufficient quality to support the estimate of Mineral Resources.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
10.0 Mineral Processing and Metallurgical Testing
Metallurgical test work programs were carried out at Skaergaard by independent laboratories between 1988 and 2009. Investigations into potential treatment routes and the selection and optimization of saleable products are still at a relatively early stage, although results are encouraging for PGE-Au recovery to a flotation concentrate, precious metals extraction by cyanidation, and recovery of iron and titaniferous concentrates by flotation and magnetic separation. A conceptual
flowsheet proposed a conventional crush-grind-flotation plant producing two concentrates (PGE-Au and vanadium-titanium-magnetite (VTM)).
The most comprehensive work was undertaken in 2004 by Process Research Associates Ltd (PRA) on bulk samples taken from three horizons exposed at the surface during the 2003 field season. These samples were made into composites to represent the H0 (Pd) and H5 (Au) rock types. The test program was focused on producing combined PGE-Au concentrates by flotation using conventional reagents (xanthate and dithiophosphate) at an optimum grind size of 80% passing 90 µm for both materials. Recoveries for the palladium (H0) test sample mineralization were approximately 85%. Recoveries for the gold (H5) test sample mineralization ranged from 80% to greater than 90%. It is unknown what certifications PRA may have had at the time.
The gangue material mined with the mineralized horizons contains two potentially saleable materials, VTM and ilmenite. Magnetic separation tests showed that a magnetite concentrate grading approximately 80% Fe3O4 containing 1.0% V2O5 and 15% TiO2 could be produced from the flotation tailings of each ore type. Flotation tests on the tailings from the magnetic separation indicated that a TiO2 concentrate grading 40% TiO2 could potentially be produced.
In 2009, SGS Lakefield conducted test work on a sample representing the gold zone. Bottle roll intensive cyanide leaching on a sample of rougher concentrate produced encouraging results for gold extraction and leach kinetics. Although platinum and palladium leach kinetics were somewhat slower than those of gold, the extractions achieved were high. The results demonstrated the possibility of producing gold doré on-site by cyanide leaching of a flotation concentrate.
Limited comminution test work has been conducted, but it indicated that the samples tested were very hard in terms of Bond ball mill work index (>20 kWh/t).
Gallium is present in anomalous concentrations in both the gold and palladium mineralization types and has been shown to concentrate with V2O5 into the VTM. At the time, it was considered unlikely that this would have any economic value as the customers for the VTM process in pyrometallurgical processes would not be amenable to recovery of gallium.
No processing factors or deleterious elements were noted at the time. To the QP’s understanding, SGS Lakefield held ISO/IEC 17025 accreditation for certain analytical methods at the time of the 2009 metallurgical test work. This supports confidence in the analytical measurements associated with the metallurgical program. However, the accreditation may not automatically apply to all aspects of the work, including flotation, bottle-roll cyanide leaching, comminution testing, and metallurgical interpretation, unless the specific methods used were within the laboratory’s accreditation scope in effect at that time.
In the QP’s opinion, this preliminary metallurgical test work is adequate for the purpose of Mineral Resources estimation. The sampling was broadly representative of the mineralization, and the laboratories were independent of the owners when the analyses were done. Additional test work is required to confirm metallurgical recoveries and the presence of potentially valuable products.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
11.0 Mineral Resource Estimates
11.1 Summary
Mineral Resources have been classified in accordance with the definitions for Mineral Resources in S-K 1300, which are consistent with Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards for Mineral Resources and Mineral Reserves dated May 10, 2014 (CIM (2014) definitions).
The current MRE has an effective date of July 3, 2026 and focuses on Pd, Au, and Pt as the precious elements of primary economic interest. The 2026 MRE uses the same geological model, and grade interpolation conventions as the historical 2022 MRE (SLR 2022). The 2026 MRE expresses combined value in terms of NSR value, but retains the PdEq grade column for comparative purposes. This helps make valid comparisons between the Mineral Resource models.
The 2026 MRE incorporates current cost assumptions and metal price forecasts for public disclosure. SLR elected to change the cut-off grade (COG) from PdEq to NSR, using the NSR values of the blocks to determine mineralization and waste rather than the PdEq grades. Classification criteria were changed to use NSR COG and NSR block values, and the drill spacing methodology was updated to use SLR’s two-hole spacing criteria.
The updated MRE consists of approximately 153 Mt of Indicated Mineral Resources at a grade of 3.04 g/t PdEq containing 14.98 Moz of PdEq and approximately 177 Mt of Inferred Mineral Resources at a grade of 3.07 g/t PdEq containing 17.5 Moz PdEq. A summary of the MRE at an NSR cut-off grade of US$84/t is presented in Table 11-1. Areas ‘North’ and ‘Main’ are separated by the northern side of the Forbindelses Glacier, at approximately 7,563,500N.
The 2026 MRE is based on information provided from a total of 93 DDH and 30 channel samples, totalling 42,050 m of drilling and 1,409 m of channel sampling, completed between 1989 and 2021. The MRE assumes an underground mining scenario at Skaergaard. Most of the 2011 core was also resampled by SLR in 2020, and the resampled assays were used for the MRE.
The 2026 MRE is built on an interpreted mineralized horizons modelled in Leapfrog software, correlated in the context of interpretation of the L0 through L3 leucocratic gabbro horizons of the Triple Group, and developed using new PhotoSat topography and image data, Pd:Au ratios, Pt concentration, and the new simplified geological model.
The SLR QP is of the opinion that with consideration of the recommendations summarized in Sections 1 and 23 of this TRS, any issues relating to all relevant technical and economic factors likely to influence the prospect of economic extraction can be resolved with further work.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Table 11-1: Summary of Mineral Resources – Effective July 3, 2026
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Category | Mineralized Horizon | Area | Tonnage (Mt) | Grade (g/t) | Contained Metal (Moz) |
| PdEq | Pd | Au | Pt | PdEq | Pd | Au | Pt |
| Indicated | H5 | North | 0.2 | 5.03 | 0.27 | 2.22 | 0.04 | 0.03 | 0 | 0.01 | 0 |
| | Main | 18.3 | 5.24 | 0.58 | 2.16 | 0.07 | 3.09 | 0.34 | 1.27 | 0.04 |
| H3 | North | 3.9 | 3.42 | 0.43 | 1.38 | 0.05 | 0.43 | 0.05 | 0.17 | 0.01 |
| | Main | 39 | 3.02 | 0.81 | 1.02 | 0.06 | 3.79 | 1.01 | 1.27 | 0.07 |
| H0 | North | 18.8 | 2.64 | 2.13 | 0.16 | 0.15 | 1.6 | 1.29 | 0.1 | 0.09 |
| | Main | 73.3 | 2.57 | 2.07 | 0.15 | 0.16 | 6.06 | 4.87 | 0.35 | 0.39 |
| Total Indicated | All | 153.6 | 3.04 | 1.53 | 0.65 | 0.12 | 15 | 7.57 | 3.19 | 0.6 |
| | | | | | | | | | | |
| Inferred | H5 | North | 34.9 | 3.9 | 0.61 | 1.52 | 0.06 | 4.38 | 0.68 | 1.71 | 0.07 |
| H3 | North | 13.8 | 3.42 | 1.16 | 1.01 | 0.11 | 1.51 | 0.51 | 0.44 | 0.05 |
| | Main | 39.1 | 3.19 | 0.78 | 1.11 | 0.05 | 4.01 | 0.99 | 1.39 | 0.06 |
| H3_L1 | North | 0.1 | 3.64 | 0.51 | 1.46 | 0.04 | 0.01 | 0 | 0.01 | 0 |
| | Main | 8.3 | 3.17 | 0.95 | 1.01 | 0.07 | 0.85 | 0.25 | 0.27 | 0.02 |
| H0 | North | 15.1 | 2.52 | 1.92 | 0.21 | 0.14 | 1.22 | 0.93 | 0.1 | 0.07 |
| | Main | 66.2 | 2.59 | 2.06 | 0.17 | 0.16 | 5.51 | 4.38 | 0.35 | 0.33 |
| Total Inferred | All | 177.5 | 3.07 | 1.36 | 0.75 | 0.11 | 17.49 | 7.75 | 4.28 | 0.6 |
Notes:
| | | | | |
| 1 | The definitions for Mineral Resources in S-K 1300 were followed for Mineral Resources, which are consistent with CIM (2014) definitions. |
| | | | | |
| 2 | The Mineral Resource estimate is reported on a 100% ownership basis. |
| | | | | |
| 3 | Mineral Exploration Licences MEL 2007-01, MEL 2012-25, and MEL 2021-10 that comprise the Project are 100% owned by Major Precious Greenland A/S (MPG), which is 80% owned by Greenland Mines Ltd. (GRML) and 20% owned by Intrusion Precious Metals Corp. (IPMC). MEL 2007-01 covers the Skaergaard Intrusion, the main host of the Skaergaard deposit. Areas ‘North’ and ‘Main’ are separated by the northern lateral moraine of the Forbindelses Glacier, at approximately 7,563,500N |
| | | | | |
| 4 | Mineral Resources are reported on an in situ basis, applying factors for mining dilution, mining losses, and process losses. Net Smelter Return (NSR) calculations assume underground mining costs of US$32.17/t, processing costs of US$35/t, and general and administration (G&A) costs of US$16.67/t. NSR is calculated using the formula NSR Value = (91.83 * g/t Au) + (40.68 * g/t Pd) + (42.63 * [g/t Pt). |
| | | | | |
| 5 | Mineral Resources are reported at an NSR cut-off value of US$84 per tonne. |
| | | | | |
| 6 | Mineral Resources are estimated using long-term prices of US$3,500/oz Au, US$1,725//oz Pd, and US$2,100/oz Pt, and assume metallurgical recoveries of 86% Pd, 89% Au, and 80% for Pt, and standard commercial terms for a precious metals concentrate. |
| | | | | |
| 7 | A minimum mining width of 2.0 m was used. NSR for thicknesses less than 2.0 m was factored to 2.0 m to represent dilution. |
| | | | | |
| 8 | PdEq grades were calculated using the formula PdEq (g/t) = g/t Pd + (2.258 * g/t Au) + (1.048 * g/t Pt). |
1.Reasonable prospects for economic extraction (RPEE) were satisfied by constructing polygons using blocks above the NSR cut-off value for thicknesses greater than 2.0 m and NSR cut-off value factored to 2.0 m to represent dilution where thicknesses are less than 2.0 m. RPEE included a visual check on the geometry and spatial continuity of the mineralization.
2.The Main area includes material south of the northern edge of the Forbindelses Glacier and under the glacier, and the North area includes material to the north of the Forbindelses Glacier.
3.Bulk density is 3.12 t/m3.
4.Numbers may not add due to rounding
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
11.2 Resource Database
The Mineral Resource database includes drilling and sampling assay information up to May 23, 2022. No further information has been collected on the property. The database was constructed by merging the pre-2021 drill season Mineral Resource database in Leapfrog with the table exports from the 2021 GeoSpark drill log database tailored to the Leapfrog table structures. For 2022, SLR excluded holes GGS, D-89-01, D-90-17, MIDNAT, PRL_08_38, PRL10_46, PRL11- 56A, PRL11-56B, PRL11-56C, PUKU, D-90-21, D-90-25, D-90-16, D-04-29, and PRL_08_35 for various reasons, including holes excluded for no assay data (e.g., PRL_08_38, PRL-11-56A/B/C, and PUKU) or holes which were inconsistently sampled next to a better-quality hole (e.g., D-89-01 and D-90-17). Since SLR modelled the dyke material based on field observations for 2022, SLR also excluded intervals where the mineralization was occluded or partially occluded (since a true picture of grade at such intervals could not be achieved) by crosscutting dyke material (Table 11-2).
Table 11-2: List of Excluded Intervals Occluded or Partially Occluded by Dyke Material
| | | | | | | | |
| Hole ID | From (m) | To (m) |
| D-89-02 | 119.2 | 159.2 |
| D-89-05 | 126.7 | 148.92 |
| D-90-10 | 370 | 430.85 |
| D-90-14 | 156.7 | 182.6 |
| D-90-15 | 316 | 349.3 |
| D-90-16A | 428 | 432 |
| D-90-16A | 442 | 456.7 |
| D-90-17A | 457.7 | 463 |
| D-90-17A | 479.8 | 484 |
| D-90-19 | 566 | 567.6 |
| D-90-19 | 577 | 577.3 |
| D-90-19 | 583.5 | 585.5 |
| D-90-23 | 769.17 | 776.5 |
| D-90-23A | 772.4 | 778.4 |
| D-90-24 | 1,043.40 | 1,044.00 |
| D-90-25A | 368 | 370.45 |
| D-90-26 | 590.65 | 623 |
| D-90-26A | 603.7 | 609.8 |
| D-04-29 | 445.1 | 527 |
| MPD019 | 210.58 | 233.5 |
| PRL_08_37 | 879.8 | 891 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
| | | | | | | | |
| Hole ID | From (m) | To (m) |
| PRL10_39 | 232 | 244 |
| PRL10_42 | 598.4 | 602.1 |
| PRL10_45 | 1,057.70 | 1,104.00 |
| PRL11-50 | 217.5 | 230 |
| PRL11-51 | 217.5 | 230 |
| PRL11-55 | 553.5 | 555.4 |
| PRL11-55 | 567.4 | 569.5 |
| PRL11-57 | 98.6 | 103.7 |
| PRL10_45 | 1,057.70 | 1,067.00 |
| PRL10_45 | 1,072.50 | 1,103.13 |
| PRL10_46 | 734.3 | 851 |
| MPD005 | 252 | 260 |
| MPD001 | 143.25 | 148.75 |
| MPD007 | 321.25 | 329.5 |
| MPD010 | 160.75 | 161.1 |
| MPD010 | 42 | 67.5 |
| MPD015 | 212.25 | 214.25 |
| MPD018 | 295.75 | 296.75 |
| MPD018 | 297.75 | 299.5 |
| MPD018 | 302 | 304.5 |
| MPD019 | 138 | 182.7 |
| MPD019 | 210.58 | 233.5 |
| MPD020 | 278.5 | 281 |
| MPD021 | 162.25 | 169 |
| MPD023 | 75 | 76.25 |
| MPD024 | 37.5 | 96 |
| MPD025 | 289.75 | 291.75 |
| MPD025 | 295.75 | 322.75 |
| MPD027 | 298.75 | 311.25 |
| MPD027 | 320.5 | 323.75 |
| MPD028 | 76.75 | 82.25 |
| MPD029 | 87.25 | 91.75 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
11.2.1 Channel Sampling
SLR notes that while the area north of the glacier is dominated by channel samples which were saw-cut and sent to accredited independent laboratories, the positional information was likely corrupted by translation through different grids over the life of the Project. SLR experimented with translating the channel information simultaneously to attempt a best fit with the projected mineralized horizon contacts on surface. Figure 11-1 presents SLR’s work performed in three stages. SLR first translated XY coordinates for the channel data north of the Forbindelses Glacier, to where it best fit the contacts
on the updated topography data. Then SLR translated XY coordinates for the northern part of the area to a secondary best fit, and finally moved the channel position XYZ coordinates locally to the expected mineralized horizon, to attempt a better fit with the slope of the topography, and to place the samples just inside the topography, so that the samples would be used in the grade estimate.
SLR reviewed the pre-2011 channel samples in context of the most recent channels and historical channel handheld GPS survey work performed in 2021. SLR ignored channels or adjusted their positions as reasonable on a case-by-case basis. The QP is of the opinion that 2021 channel sampling contributes to the interpretation of the mineralized horizons, however, handheld GPS surveys of pre-2011 samples correlate poorly with historical lengths, positions, and orientations. This tends to lower confidence in the pre-2011 channel sample records. The QP concludes that historical channel information would not support Indicated or Measured classifications but can be used for Inferred Mineral Resource estimates, especially where supported by drilling within 600 m.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 11-1: Channel Repositioning
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
11.3 Geological Interpretation
The geological model remains unchanged from the geological model in the 2022 MRE (SLR 2022). The 2022 MRE geological model for the Skaergaard deposit was generated in Leapfrog version 2022.1.0 and updated with mineralized horizons and a semi-quantitative mafic dyke model. SLR used the mapping and sections from McBirney (1989) and Neilsen (2006) to build a contextual geological model inside of a modelled magma chamber. SLR notes that there are remaining improvements that could be made to the model, as the model was simplified to include the Marginal Border Series as a continuous part of the parent rock type. Structure with significant offsets to the Triple Group appears to be rare, although there is one faulted and dyke-filled offset observable below the plateau area to the east, and a few offsets observable at the top of the mountain north of the Forbindelses Glacier. These offsets were not built into the Skaergaard geological model, as their extent is unknown. Glacial bathymetry was updated using the 2021 drill hole data. Previous locations where interpolated glacial bathymetry resulted in occlusion of the mineralized horizons were re-examined by extrapolating known depths for the new drilling east and west. Oceanic bathymetry were not obtained for the purposes of the 2022 MRE. The simplified geological model of the Skaergaard Intrusion, as constructed in Leapfrog, is presented in Figure 11-2.
To use the layer succession as a guide for correlation of mineralized horizons, SLR modelled the L0, L1, L2, and L3 leucocratic gabbros separately from the generalized geological model, using the vein function in Leapfrog. To ensure that the horizons were oriented consistently, SLR inserted points at predicted approximate locations on the drill hole traces where the leucocratic gabbros were not logged or only partially logged. Leucocratic gabbro positions were also digitized on the draped PhotoSat imagery.
SLR modelled the mineralized horizons separately from the general lithological model, using the vein functionality in Leapfrog to provide source hanging wall and footwall surfaces for a ‘stratigraphic’ style model of layered mineralization with interlayers of relatively unmineralized material. The mineralized horizons were then inserted into the lithological model.
To account for barren mafic dyke material in the 2022 MRE, SLR changed methodology from using the dyke material frequency in the database as a proxy for the dyke content, to a more geologically accurate semi-quantitative (the secondary north-south orientation was not modelled, as all of the intercepts were used in the east-west modelled dykes, and reusing these intercepts would lead to double counting and overrepresentation) dyke model which is excluded after the grade interpolation (Figure 11-4). The QP used long extrapolation distances, consistent with field observations.
For the area north of the Forbindelses Glacier, SLR digitized points on the centers of the leucocratic gabbros where they were discernible on the PhotoSat imagery, draped on two metre resampled PhotoSat topography (Figure 11-3) in Leapfrog. SLR then digitized points to represent the expected positions of the mineralized horizons and built mineralized horizons without the channel sample information. Horizon solids were then exported to Vulcan software, channel samples repositioned to the expected mineralized horizons relative to the leucocratic gabbro positions, and new channel collars re-imported.
Since modelled mineralization takes precedence for the purposes of the Mineral Resource estimate, only the L3 leucocratic gabbro and the mineralized H0-H5 horizons were finally included in the lithological model. The L0 through L2 leucocratic gabbros remain as separate solids for correlation purposes.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 11-2: Geological Model
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 11-3: PhotoSat Data in Leapfrog
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 11-4: Dyke Modelling and Estimation Changes: H0 Example
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
11.3.1 Horizon Thickness
SLR reviewed the horizon selection statistics and updated mineralized horizon thickness tolerances in Leapfrog according to reasonable minimum and maximum thicknesses for each horizon. For classified material, average vertical thicknesses are shown in Table 11-3. Horizon thickness plan views are shown in Figure 11-5. The QP notes that the horizons between the mineralized horizons also contain Pd, Au, and Pt at much lower grades, which are subeconomic, and that the grade of the H0 palladium-rich horizon footwall often tends to taper off over several metres through 0.8 g/t PdEq. SLR recommends performing internal studies to determine the potential underground bulk mining viability of a thicker H0 horizon, selected using a lower cut-off grade.
Table 11-3: Average Vertical Thicknesses of Mineralized Horizons
| | | | | | | | |
| Category | Mineralized Horizon | Vertical Thickness Average (m) |
| Indicated | H5 | 2.6 |
| H3 | 3 |
| H0 | 4 |
| Inferred | H5 | 2.6 |
| H3 | 3.7 |
| H3_L1 | 2.4 |
| H0 | 3.9 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 11-5: Mineralized Horizon Vertical Thickness
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
11.4 Resource Assays
The Mineral Resource database is based on the 2021 drilling and sampling information exported from GeoSpark logging database and appended to the pre-2021 Mineral Resource database. The updated data was checked against the assay certificates. A total of 66 assays which failed QC were rerun and updated. A summary of sample statistics by mineralized horizon is presented in Table 11-4.
Table 11-4: Length Weighted Sample Summary Statistics by Mineralized Layer
| | | | | | | | | | | | | | | | | | | | |
| Horizon | Element | Count | Mean | Minimum | Maximum | CV |
| H5 | | | | | | |
| Pd (g/t) | 416 | 0.36 | 0 | 2.15 | 1.15 |
| Au (g/t) | 416 | 0.95 | 0 | 6 | 1.39 |
| Pt (g/t) | 416 | 0.05 | 0 | 0.22 | 0.81 |
| H3 | | | | | | |
| Pd (g/t) | 756 | 0.76 | 0 | 4.2 | 0.72 |
| Au (g/t) | 756 | 0.76 | 0 | 6 | 1.28 |
| Pt (g/t) | 756 | 0.06 | 0 | 0.19 | 0.66 |
| H3_L1 | | | | | | |
| Pd (g/t) | 399 | 0.69 | 0 | 1.78 | 0.53 |
| Au (g/t) | 399 | 0.41 | 0 | 6 | 1.86 |
| Pt (g/t) | 399 | 0.06 | 0 | 0.35 | 0.64 |
| H0 | | | | | | |
| Pd (g/t) | 1,126 | 1.9 | 0 | 4.2 | 0.43 |
| Au (g/t) | 1,126 | 0.15 | 0 | 3.97 | 1.61 |
| Pt (g/t) | 1,126 | 0.15 | 0 | 0.35 | 0.39 |
11.5 Treatment of High Grade Assays
11.5.1 Capping Levels
SLR reviewed available assay information by mineralized horizon to determine capping levels. Review of Pd and Pt data showed long continuous tails for grades. Experimental capping of grades in the long tails did not remove significant metal. To control several outliers, SLR applied capping at 4.2 g/t Pd, 6.0 g/t Au, and 0.35 g/t Pt to the mineralized horizons.
11.5.2 High Grade Restriction
No high yield restriction was performed on the deposit.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
11.6 Compositing
Given that drill holes are spaced approximately 250 m to 700 m apart and mineralized horizons are two metres to four metres thick, SLR used full length composites for each of the mineralized horizons, so that each mineralized horizon intercept on each hole is represented by one composite. Composite statistics by mineralized horizon are shown in Table 11-5.
Table 11-5: Length Weighted Composite Statistics by Mineralized Layer
| | | | | | | | | | | | | | | | | | | | |
| Name | Element | Count | Mean | Minimum | Maximum | CV |
| H5 |
| Pd (g/t) | 94 | 0.36 | 0 | 1.3 | 0.9 |
| Au (g/t) | 94 | 0.95 | 0 | 4.96 | 1.03 |
| Pt (g/t) | 94 | 0.05 | 0 | 0.13 | 0.55 |
| H3 |
| Pd (g/t) | 106 | 0.76 | 0 | 1.75 | 0.6 |
| Au (g/t) | 106 | 0.76 | 0.01 | 5.6 | 0.83 |
| Pt (g/t) | 106 | 0.06 | 0 | 0.15 | 0.57 |
| H3_L1 |
| Pd (g/t) | 94 | 0.69 | 0 | 1.3 | 0.49 |
| Au (g/t) | 94 | 0.4 | 0 | 2.91 | 1.27 |
| Pt (g/t) | 94 | 0.06 | 0 | 0.14 | 0.5 |
| H0 |
| Pd (g/t) | 100 | 1.89 | 0 | 2.92 | 0.3 |
| Au (g/t) | 100 | 0.15 | 0 | 2.5 | 1.08 |
| Pt (g/t) | 100 | 0.15 | 0 | 0.25 | 0.3 |
11.7 Trend Analysis
11.7.1 Variography
SLR performed variogram analyses for Pd, Au, and Pt on all the mineralized horizons in Leapfrog. Variograms were generally poor due to the distances between holes. A general consensus between modelled variograms indicates a range of approximately 800 m to 1,000 m, with 80% to 90% of the sill at 400 m to 600 m. Example major axis variograms are shown in Figure 11-6.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 11-6: Example Major Axis Variograms for H5 (Au), H3 (Au), and H0 (Pd)
11.7.2 Grade Contouring
11.8 Search Strategy and Grade Interpolation Parameters
Based upon observations of grade distribution for Au and Pd, along with the variography and the drill spacing, SLR performed the grade interpolation for each mineralized horizon by a spherical search using inverse distance cubed (ID3) in three separate passes at 600 m, 1,200 m, and 3,300 m. Each pass was informed by a minimum of one full length sample and a maximum of three. The longest pass was to estimate all the remaining distal blocks in the mineralized horizons.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
11.9 Bulk Density
SLR examined the updated bulk density information provided for the Project. SLR updated the density information and then flagged it by mineralization and by lithology to a merged table in Leapfrog. When viewed by mineralized horizon, density appears to vary from 3.0 g/cm3 to 3.24 g/cm3 (Figure 11-7). The QP notes, however, that the sample count in each horizon varies from 32 to 129 samples, and that the only horizon with a density of 3.24 g/cm3 is H5. The low sample counts prompted SLR to use the aggregate density for all 2,344 gabbro density samples at 3.12 g/cm3. Aggregated by leucocratic and melanocratic gabbro, the mean densities also seem to indicate that leucocratic gabbros have a mean density of approximately 3.0 g/cm3, and melanocratic gabbros have a mean density of approximately 3.2 g/cm3, albeit with only 95 samples for the latter.
The QP concludes that the bulk density would be more appropriately set at the gabbro average of 3.12 g/cm3 for the purposes of the MRE. The QP considers that sometimes the gradations in rock type confound logging of L0 through L3, and that mineralized horizons currently appear to be stratiform to the leucocratic layers, but not bound to them. Further study could be made to determine the density assignments between melanocratic gabbro and leucocratic gabbro, including taking more density measurements, and performing regression analyses with magnetic susceptibility to determine if there is a strong relationship with density.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 11-7: Density Histograms
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
11.10 Block Models
SLR constructed a sub-blocked model in Leapfrog, which splits 20 m x 20 m blocks by the height of each model horizon, dipping directly south at the average 20° dip of the mineralized horizons. SLR chose the block size and dip to maximize the continuity of the blocks on each mineralized horizon. Sub-blocking was performed in the H0-H5 stack and was based on the mineralization model. Block height in each mineralized horizon was set to a minimum of 0.1 m and allowed to vary by the thickness of the modelled horizon (Table 11-6). Blocks outside the mineralized package were allowed to obtain extremely large extents to save model size overall, since grades were not being interpolated above and below the main mineralized envelope.
Table 11-6: Block Model Parameters (Leapfrog)
| | | | | | | | | | | | | | |
| X | Y | Z | Degrees |
| Parent Block Size (m) | 500 | 500 | 500 | |
| Sub-Block Count | 25 | 25 | NA | |
| Minimum Block Height (m) | | | 0.1 | |
| Base Point | 551,298.22 | 7,558,035.38 | -27.74 | |
| Boundary Size (m) | 8,000.00 | 8,500.00 | 2,500.00 | |
| Number of Parent Blocks | 16 | 17 | 1 | |
| Azimuth | | | | 0 |
| Dip | | | | -20 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
11.11 Cut-off Grade and Whittle Parameters
Metal prices used for reserves are based on consensus, long term forecasts from banks, financial institutions, and other sources. For resources, metal prices used are slightly higher than those for reserves.
To estimate an appropriate cut-off grade, it is envisaged that Skaergaard would be developed using underground mining methods at high throughput to produce a single precious-metals concentrate containing economic quantities of Pd, Au, and Pt. All other potential by-product credits have been excluded. SLR has estimated the order of magnitude of operating costs to be US$84/t processed, as presented in Table 11-7.
Key inputs related to the calculation of metal equivalent, such as metal prices, concentrate commercial terms, metallurgical recovery, and royalties, are summarized in Table 11-8.
Table 11-7: Mining Operating Cost Assumptions
| | | | | | | | |
| Parameter | Units | Operating Cost Assumptions |
| Mining | US$/t processed | 32.17 |
| Processing | US$/t processed | 35 |
| G&A | US$/t processed | 16.67 |
| Total | US$/t processed | 83.83* |
| * Note: Rounded to US$84 per tonne for MRE cut-off value |
Table 11-8: Metal Price and Recovery Assumptions
| | | | | | | | |
| Parameter | Units | Value |
| Metal Prices | | |
| Pd | US$/oz | 1,725 |
| Au | US$/oz | 3,500 |
| Pt | US$/oz | 2,100 |
| Metallurgical Recovery | | |
| Pd | % | 86 |
| Au | % | 89 |
| Pt | % | 80 |
| Concentrate Terms | N/A | Standard |
| Net Smelter Return (NSR) Royalty | % | 2.5 |
It is anticipated that Pd will have the highest portion of revenue from the concentrate, and therefore the deposit is reported using palladium equivalent grams per tonne.
Mineral Resources are reported using an NSR cut-off grade of US$84/t. Block NSR values for the base case are calculated using the following formula:
NSR Value = (91.83 * g/t Au) + (40.68 * g/t Pd) + (42.63 * g/t Pt)
Palladium equivalent grades are calculated via the metal equivalent formula below:
PdEq (g/t) = g/t Pd + (2.258 * g/t Au) + (1.048 * g/t Pt)
SLR notes that the spot price of Pd in 2026 has varied between approximately US$1,320/oz and US$2,100/oz. Pd prices over the past five years have been volatile, ranging from approximately US$925/oz to US$2,850/oz (excluding a spike to US$3,099/oz in Q1 2022). Gold prices since 2023 have increased from approximately US$1,800/oz to approximately US$4,170/oz at the time of this TRS. Platinum prices have increased from approximately US$950/oz mid-2025 to range from approximately US$1,700/oz to US$2,300/oz in 2026.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
11.12 Classification
Definitions for resource categories used in this TRS are those defined by SEC in S-K 1300, and are consistent with those defined by CIM (2014). A Mineral Resource is defined as “a concentration or occurrence of solid material of economic interest in or on the Earth’s crust in such form, grade or quality and quantity that there are reasonable prospects for economic extraction (RPEE)”. Mineral Resources are classified into Measured, Indicated, and Inferred categories. A Mineral Reserve is defined as the “economically mineable part of a Measured and/or Indicated Mineral Resource” demonstrated by studies at Pre-Feasibility or Feasibility level as appropriate. Mineral Reserves are classified into Proven and Probable categories.
SLR examined a series of plan views of mineralized grade and grade time thickness for each horizon. Taken in context with the general result of the variography, SLR classified Indicated Mineral Resources as blocks with less than 300 m to the nearest drill hole, with an average two-hole drill spacing distance of less than 600 m for the holes informing the block, and a minimum NSR COG value of US$84/t to ensure reasonable prospects for eventual mineability. Inferred Mineral Resources were classified as blocks estimated with more than 600 m to the nearest drill hole, with an average two-hole drill spacing distance of less than 800 m. The NSR COG is applied directly to material over 2.0 m thick, and is factored for material less than 2.0 m thick to represent a proxy for diluted tonnages. SLR classified Mineral Resources in a two-stage process, first coding the blocks according to the above criteria to a raw ‘category’ variable, and then constructing polygons to represent each Mineral Resource Class in each mineralized horizon.
The Skaergaard mineralization and the classification of each horizon are shown in Figure 11-8.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 11-8: Mineralized Layer Models and Classification
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
11.13 Block Model Validation
SLR performed block validation by generating a series of plan views of block grades and composite grades for Pd, Au, and Pt, for each mineralized horizon. SLR also ran a nearest neighbour (NN) estimate concurrent to the ID³ estimate, and generated swath plots and statistical comparisons for each horizon. An example plan view of validation is shown in Figure 11-9 and an example swath plot is shown in Figure 11-10.
Figure 11-9: Example Block Validation Plan View, H0, Pd
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 11-10: Example Swath Plot, H0, Pd
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
11.14 Mineral Resource Reporting
The 2026 MRE has an effective date of July 3, 2026, and is based on information provided from 93 DDH and 30 channel samples, totalling 42,050 m of drilling and 1,409 m of channel sampling, completed between 1989 and 2021. A summary of the MRE at an NSR cut-off grade of US$84/t is presented in Table 11-9. Areas ‘North’ and ‘Main’ are separated by the northern lateral moraine of the Forbindelses Glacier, at approximately 7,563,500N
In light of the importance of PGE, which represent approximately 70% of the Skaergaard deposit's value, the current Mineral Resource estimate continues to include PdEq grade and ounces columns to allow comparison with the previous 2022 MRE (SLR 2022).
The SLR QP is of the opinion that with consideration of the recommendations summarized in Sections 1 and 23 of this TRS, any issues relating to all relevant technical and economic factors likely to influence the prospect of economic extraction can be resolved with further work.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Table 11-9: Summary of Mineral Resources – Effective July 3, 2026
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Category | Mineralized Horizon | Area | Tonnage (Mt) | Grade (g/t) | Contained Metal (Moz) |
| PdEq | Pd | Au | Pt | PdEq | Pd | Au | Pt |
| Indicated | H5 | North | 0.2 | 5.03 | 0.27 | 2.22 | 0.04 | 0.03 | 0 | 0.01 | 0 |
| | Main | 18.3 | 5.24 | 0.58 | 2.16 | 0.07 | 3.09 | 0.34 | 1.27 | 0.04 |
| H3 | North | 3.9 | 3.42 | 0.43 | 1.38 | 0.05 | 0.43 | 0.05 | 0.17 | 0.01 |
| | Main | 39 | 3.02 | 0.81 | 1.02 | 0.06 | 3.79 | 1.01 | 1.27 | 0.07 |
| H0 | North | 18.8 | 2.64 | 2.13 | 0.16 | 0.15 | 1.6 | 1.29 | 0.1 | 0.09 |
| | Main | 73.3 | 2.57 | 2.07 | 0.15 | 0.16 | 6.06 | 4.87 | 0.35 | 0.39 |
| Total Indicated | All | 153.6 | 3.04 | 1.53 | 0.65 | 0.12 | 15 | 7.57 | 3.19 | 0.6 |
| | | | | | | | | | | |
| Inferred | H5 | North | 34.9 | 3.9 | 0.61 | 1.52 | 0.06 | 4.38 | 0.68 | 1.71 | 0.07 |
| H3 | North | 13.8 | 3.42 | 1.16 | 1.01 | 0.11 | 1.51 | 0.51 | 0.44 | 0.05 |
| | Main | 39.1 | 3.19 | 0.78 | 1.11 | 0.05 | 4.01 | 0.99 | 1.39 | 0.06 |
| H3_L1 | North | 0.1 | 3.64 | 0.51 | 1.46 | 0.04 | 0.01 | 0 | 0.01 | 0 |
| | Main | 8.3 | 3.17 | 0.95 | 1.01 | 0.07 | 0.85 | 0.25 | 0.27 | 0.02 |
| H0 | North | 15.1 | 2.52 | 1.92 | 0.21 | 0.14 | 1.22 | 0.93 | 0.1 | 0.07 |
| | Main | 66.2 | 2.59 | 2.06 | 0.17 | 0.16 | 5.51 | 4.38 | 0.35 | 0.33 |
| Total Inferred | All | 177.5 | 3.07 | 1.36 | 0.75 | 0.11 | 17.49 | 7.75 | 4.28 | 0.6 |
Notes:
1.The definitions for Mineral Resources in S-K 1300 were followed for Mineral Resources, which are consistent with CIM (2014) definitions.
2.The Mineral Resource estimate is reported on a 100% ownership basis.
3.Mineral Exploration Licences MEL 2007-01, MEL 2012-25, and MEL 2021-10 that comprise the Project are 100% owned by Major Precious Greenland A/S (MPG), which is 80% owned by Greenland Mines Ltd. (GRML) and 20% owned by Intrusion Precious Metals Corp. (IPMC). MEL 2007-01 covers the Skaergaard Intrusion, the main host of the Skaergaard deposit. Areas ‘North’ and ‘Main’ are separated by the northern lateral moraine of the Forbindelses Glacier, at approximately 7,563,500N
4.Mineral Resources are reported on an in situ basis, applying factors for mining dilution, mining losses, and process losses. Net Smelter Return (NSR) calculations assume underground mining costs of US$32.17/t, processing costs of US$35/t, and general and administration (G&A) costs of US$16.67/t. NSR is calculated using the formula NSR Value = (91.83 * g/t Au) + (40.68 * g/t Pd) + (42.63 * [g/t Pt).
5.Mineral Resources are reported at an NSR cut-off value of US$84 per tonne.
6.Mineral Resources are estimated using long-term prices of US$3,500/oz Au, US$1,725//oz Pd, and US$2,100/oz Pt, and assume metallurgical recoveries of 86% Pd, 89% Au, and 80% for Pt, and standard commercial terms for a precious metals concentrate.
7.A minimum mining width of 2.0 m was used. NSR for thicknesses less than 2.0 m was factored to 2.0 m to represent dilution.
8.PdEq grades were calculated using the formula PdEq (g/t) = g/t Pd + (2.258 * g/t Au) + (1.048 * g/t Pt).
9.Reasonable prospects for economic extraction (RPEE) were satisfied by constructing polygons using blocks above the NSR cut-off value for thicknesses greater than 2.0 m and NSR cut-off value factored to 2.0 m to represent dilution where thicknesses are less than 2.0 m. RPEE included a visual check on the geometry and spatial continuity of the mineralization.
10.The Main area includes material south of the northern edge of the Forbindelses Glacier and under the glacier, and the North area includes material to the north of the Forbindelses Glacier.
11.Bulk density is 3.12 t/m3.
12.Numbers may not add due to rounding.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
11.14.1 Sources of Uncertainty
SLR considers that the two main sources of uncertainty in the Mineral Resource model are likely to arise from uncertainties around the frequency of 10 m to 20 m faulted offsets south of the glacier, and the frequency and volume of mafic dyke material across the intrusion. Faulted offsets of the mineralized horizon appear to be more of a concern for future underground mining, and likely have little or no impact on the global tonnage or grade. The dyke volumes have been extrapolated over long distances at a single orientation by extending drilled intercepts east-west and up and down, but are not tied to mapping at present. The QP recommends that dyke material on the surface be mapped and extended into the model at the mapped orientations.
Grade uncertainty remains at approximately 300 m drill spacing, but the nature of the deposit shows very good consistency in layer thickness and grades from hole to hole. An approximately 150 m spacing in future programs would contribute to this understanding of continuity.
As shown in the NSR sensitivity in the next subsection, the deposit tonnage is also sensitive to cut-off values between US$60 and US$125 per tonne.
11.14.2 NSR Sensitivity to Metal Prices
SLR generated metal price sensitivity analyses for three cases. Metal prices for the three cases are shown in Table 11-10. The Mineral Resource is reported using the base case. The low and high cases were evaluated for illustrative purposes and do not represent alternative Mineral Resource estimates.
The available volume was held constant by using category distance criteria only, reporting inside the mineralized horizons, so the tonnages involved are slightly different from the MRE volume as COG and thickness constraints are not used for this exercise. A grade-tonnage plot of NSR sensitivities for the three metal price cases is shown for the cases excluding and including Inferred Resources in Figure 11-11 and Figure 11-12, respectively. The figures demonstrate that overall tonnages are sensitive to cut-off grade, and that the High metal price case could sustain up to an approximately US$110/t NSR cut-off grade without decreasing the available tonnage.
Sensitivity cases are reported using an NSR cut-off grade of US$84/t. Block NSR values for the cases are calculated using the following formula:
NSR Value (High Case) = (134.92 * g/t Au) + (42.81 * g/t Pd) + (44.53 * g/t Pt)
NSR Value (Medium Base Case) = (91.83 * g/t Au) + (40.68 * g/t Pd) + (42.63 * g/t Pt)
NSR Value (Low Case) = (78.47 * g/t Au) + (40.55 * g/t Pd) + (42.5 * g/t Pt)
Table 11-10: Metal Price Sensitivity Cases
| | | | | | | | | | | | | | |
| Metal | 2022 Historical US$/oz | 2026 Low US$/oz | 2026 Med: BASE CASE US$/oz | 2026 High US$/oz |
| Au | 1,800 | 3,000 | 3,500 | 5,100 |
| Pd | 1,725 | 1,725 | 1,725 | 1,800 |
| Pt | 1,250 | 2,100 | 2,100 | 2,175 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 11-11: NSR Cut-off Grade (US$/t) Sensitivity Excluding Inferred Material
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 11-12: NSR Cut-off Grade (US$/t) Sensitivity Including Inferred Material
11.14.3 Comparison with Previous Estimate
As in the historical 2022 MRE, the 2026 Mineral Resource update focuses on Pd, Au, and Pt as the precious elements of primary economic interest. The updated Mineral Resource uses the same geological model, grade interpolation conventions and block model schema as the 2022 MRE. The 2026 MRE expresses combined value in terms of NSR value, but retains the PdEq grade column for comparative purposes. This helps make valid comparisons between the 2022 and 2026 Mineral Resource models.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
The final updated 2026 MRE chiefly incorporates updated cost assumptions and metal prices. For 2026, SLR elected to change the COG from PdEq to NSR, using the NSR values of the blocks to determine mineralization and waste rather than the PdEq grades. The new MRE shows approximately 4% less Indicated Resource tonnage, and 14% less Inferred Resource tonnage relative to the 2022 MRE (Table 11-11). However, increased metal prices (particularly gold) lead to an increase in PdEq equivalent ounces relative to 2022 of approximately 31% more PdEq ounces in Indicated Resource, and 24% more PdEq ounces in Inferred Resources:
Updated material classification with the new US$84/t NSR COG, drill hole spacing, and 2.0 m effective minimum thickness criteria results in similar Mineral Resource classification boundaries (Figure 11-13).
Table 11-11: Net Percent Changes from Historical 2022 MRE
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Class | Horizon | Mass | Average Value | Material Content |
| PdEq | Pd | Au | Pt | PdEq | Pd | Au | Pt |
| diff Mt % | diff g/t % | diff g/t % | diff g/t % | diff g/t % | diff moz % | diff moz % | diff moz % | diff moz % |
| Indicated | H5 | 51% | 84% | -3% | 6% | 9% | 177% | 46% | 61% | 64% |
| H3 | -3% | 59% | -5% | 7% | -3% | 55% | -8% | 4% | -6% |
| H0 | -10% | 13% | 3% | -1% | 2% | 1% | -7% | -11% | -8% |
| All | -4% | 36% | -3% | 22% | -2% | 31% | -6% | 18% | -5% |
| Inferred | H5 | -9% | 56% | -2% | -9% | -7% | 42% | -11% | -18% | -16% |
| H3 | -3% | 72% | -11% | 38% | -6% | 67% | -13% | 34% | -9% |
| H3_L1 | 8% | 61% | -2% | 15% | -3% | 73% | 5% | 24% | 4% |
| H0 | -22% | 20% | 8% | 26% | 0% | -7% | -17% | -2% | -23% |
| All | -14% | 44% | -2% | 20% | -6% | 24% | -15% | 4% | -19% |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Figure 11-13: 2022 MRE vs. 2026 MRE Classification Changes
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
12.0 Mineral Reserve Estimates
There are no Mineral Reserves on the Skaergaard deposit.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
13.0 Mining Methods
This section is not applicable.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
14.0 Processing and Recovery Methods
This section is not applicable.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
15.0 Infrastructure
This section is not applicable.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
16.0 Market Studies
This section is not applicable.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
17.0 Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups
This section is not applicable.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
18.0 Capital and Operating Costs
This section is not applicable.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
19.0 Economic Analysis
This section is not applicable.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
20.0 Adjacent Properties
Conico Ltd. (Conico), a mining company listed on the ASX under the CNJ stock ticker, holds two active licences, covering 4,521 km2, adjacent to the Project. Conico’s focus is on the early-stage exploration of the Ryberg Project, where sulphide mineralization is associated with mafic/ultramafic intrusions. Reported geochemical analyses indicate the presence of copper, palladium, and gold, as well as nickel, cobalt, and platinum. Drill-ready targets have already been identified utilizing a combination of high-resolution geophysics and geochemistry (Conico website 2026).
In addition, Bright Star Resources Ltd (Bright), a private company registered in England and Wales with company number 12182184, was granted an active Exploration Licence on September 16, 2020 (GEUS). The licence covers 86 km2 and is located adjacent to Skaergaard. No other public information is available on the Bright property.
SLR has not independently verified this information, and this information is not necessarily indicative of the mineralization at Skaergaard. SLR notes that the Skaergaard Intrusion is wholly contained within the Mining Exploration Lease controlled by GRML.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
21.0 Other Relevant Data and Information
No additional information or explanation is necessary to make this TRS understandable and not misleading.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
22.0 Interpretation and Conclusions
SLR QP offers the following conclusions.
22.1 General
•The Skaergaard Intrusion is an example of a layered mafic igneous complex with stratiform PGE-Au and iron–titanium (Fe-Ti) oxide mineralization. The Skaergaard Intrusion is exposed over an area of 70 km², with approximate dimensions of 7.5 km (east-west) and 11 km (north-south). It has a tabular, sill-like, bowl-shaped geometry, which dips southwards between 18° and 30°.
a.The Layered Series is subdivided petrographically into the Upper, Middle, Lower, and Hidden zones. Within the upper 90 m of the Middle Zone is the Triple Group, which is a rhythmically banded plagioclase-augite-titanomagnetite-ilmenite cumulate consisting of interbanded leucocratic and melanocratic gabbro layers. All known PGE mineralization is associated with the Triple Group that thickens towards the centre of the intrusion and shows a greater concentration of Fe-Ti oxide layers towards the margins.
•The drilling, surveying, core collection, transport, logging, sampling, quality assurance and quality control (QA/QC), and security procedures meet industry standards and are of sufficient quality to support a Mineral Resource estimate.
•There are no known drilling, sampling or recovery factors that could materially impact the accuracy and reliability of the MRE results.
22.2 Exploration
•The summer 2021 program of 7,787 m of drilling in 32 DDH, and four channel samples affirmed significant grades across the main part of the deposit under the glacier, and expanded classified material at the west and east margins, and to the north. This information was used in the 2022 MRE which included updates in mineral horizon selection interpretation, horizon thickness statistics, glacial bathymetry, and a change to physical dyke modelling.
•Further exploration could extend to the limits of the mineralized Triple Group horizons inside the boundaries of the Skaergaard Intrusion, which is likely also constrained by the Marginal Border Series rock. Further drilling could increase the Inferred Mineral Resource, upgrade current Inferred Mineral Resources to Indicated Mineral Resource material, further define high and low grade areas of mineralization, and delineate barren dyke material more accurately.
22.3 MRE
•An updated 2026 MRE was prepared by SLR, using DDH and channel sample data generated by MPM and its predecessors to create an updated block model. The MRE is based on information provided from 93 DDH and 30 channel samples, totalling 42,050 m of diamond drilling and 1,409 m of channel sampling, completed between 1989 and 2021. The MRE also includes the results of the 2020 SLR resampling of most of the 2011 core.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
•The updated MRE, with an effective date of July 3, 2026, consists of:
a.Indicated Mineral Resources of 153.6 Mt at a grade of 3.04 g/t PdEq containing 15.0 Moz of PdEq
b.Inferred Mineral Resources of 177.5 Mt at a grade of 3.07 g/t PdEq containing 17.5 Moz PdEq.
•The 2026 MRE includes updates to metal price and mining cost assumptions, and changes to NSR cut-off value reporting along with updated classification extents based on the new parameters.
•The 2026 Mineral Resources are estimated using long-term prices of US$3,500/oz Au, US$1,725/oz Pd, and US$2,100/oz Pt, and assume metallurgical recoveries of 86% Pd, 89% Au, and 80% for Pt, and standard commercial terms for a precious metals concentrate, and assumes an underground mining scenario.
•The 2020 resampling program results for palladium, gold, and platinum are of sufficient quality to support Mineral Resource estimation as incorporated into the Mineral Resource database. The QP notes that statistical
analyses showed results close to those of the original assays, suggesting that grades are fairly uniform and repeatable.
•The bulk density review indicates that density would be more appropriately set at the gabbro average of 3.12 g/cm3 for the purposes of the Mineral Resource estimate.
22.4 Geological Model
•SLR has produced a wireframe model of the geology of the Skaergaard deposit, using sectional information, drilling, and mapping.
•SLR has produced a wireframed interpretation of the L0 through L3 leucocratic gabbro marker horizons of the Triple Group, using the drill data and the new PhotoSat data.
•SLR has modelled four of the mineralized horizons, H0, H3L1, H3, and H5, using the light-coloured (leucocratic) horizon interpretation as a positional guide.
•The primary dyke orientation and thicknesses run approximately east-west, and the secondary orientations run approximately north-south in a perpendicular fashion. These dykes show extensive continuity and persistent thicknesses in both vertical and lateral dimensions, and crosscut the leucocratic L0-L3 horizons in outcrop north of the Forbindelses Glacier. The camp area likely over-represents barren dyke material, which may in part explain the lower camp elevations.
•SLR has produced a semi-quantitative physical model of the dominant east-west trending mafic dykes.
•There is a good correlation between low magnetic susceptibility readings and leucocratic gabbros.
22.5 Topography
•For 2021, MPM procured 0.5 m Landsat topography data and imagery covering the Skaergaard Intrusion and adjacent area around Miki’s Fjord from PhotoSat. The relative horizontal accuracy of PhotoSat's precision orthophotos is generally better than 50 cm over distances of 10 km. For elevation, the root mean square error (RMSE) of the PhotoSat survey is 15 cm.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
22.6 Collar Surveys
•Original borehole coordinates, collar elevations, and depths drilled from the surface of the Forbindelses Glacier are based on historical surveying. This glacier has significantly receded since 1989.
•In July 2011, a total of 39 drill holes and two channels were surveyed with real-time kinematic positioning (RTK-GPS) equipment by Asiaq Greenland Survey (Asiaq). The remaining 32 historical DDH and 24 historical channels were not located and not resurveyed.
•In August and September 2021, Asiaq surveyed all drill hole collars and channels completed in the 2021 field season. Asiaq also established a new fixed point on Kraemer Island, which can be used for future survey work.
•The distance between topographic surface and current collar elevations is generally between 5 m and 10 m above the topographic surface but is often ± 5 m. The distance between topographic surface and pre-2011 collar elevations is generally within ± 5 m but can be up to ± 35 m in holes with a D* prefix. The QP considers that this leads to some waviness in the mineralized horizons but does not materially affect the MRE.
22.7 Downhole Surveys
•Nine 2021 holes lack good-quality downhole survey data but likely have similar deviation to the other 2021 holes at depth, given the consistency of the rock package and relative lack of structure. In addition, the 300 m to 600 m spacing of the holes outweighs any positional change in horizons resulting from hole deviation. The broad spacing of the drilling and the consistent dip results of planned dips offset concerns about this downhole survey data.
•The poor downhole survey QC on some of the 2021 drill holes would not have a material impact on the MRE.
22.8 Channels
•Using updated PhotoSat topography data and new imagery in the context of the updated geology and mineralization interpretation, SLR has repositioned the unsurveyed channel samples north of the Forbindelses Glacier with sufficient confidence to classify Inferred Mineral Resources in the area.
•The excellent work done in surveying the extant historical channels with handheld GPS and photographing them shows that SLR’s 2021 historical channel repositioning was accurate in a general sense, but samples may be at lower elevation on the west side of the outcrop. Sample lengths and surveyed lengths, and azimuths do not agree
with the historical samples in the SLR database. Historical channels do not support any classification above Inferred Mineral Resource.
•The 2021 channel sampling contributes to the interpretation of the mineralized horizons, but handheld GPS pickups of pre-2011 samples correlate poorly with historical lengths, positions, and orientations.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
22.9 Database
•The database is currently composed of several separate components, which were assembled and exported to the Mineral Resource database, and is not currently warehoused in an industry-standard geological information management system (GIMS).
22.10 QA/QC and Assay Verification
•Sample preparation and analysis workflows and practices are sufficient to support an updated MRE.
•QA/QC information is limited for drilling and sampling data prior to 2000, but relatively complete for 2008 to 2011 information in the Mineral Resource database. SLR reviewed available QA/QC reports and did not identify any significant issues. QA/QC programs, as designed and implemented by the prior owners, were based on industry-standard practices at the time.
•Historical assay certificate information is also limited for drill data prior to 1990. This impacted the verification of the assays in the Mineral Resource database. SLR’s verification of the available certificate data did not show any significant discrepancies.
•The QA/QC program implemented for the 2021 field program meets industry standard practice, and no significant contamination or bias was identified. In SLR’s opinion, however, for future drilling programs, the current certified reference materials (CRM) should be reviewed to ensure that the sample matrix is suitable for the mineralization at Skaergaard.
•The information contained in the Mineral Resource database is of sufficient quality to support the Mineral Resource estimate.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
23.0 Recommendations
23.1 Summary of Recommendations
SLR QP offers the following recommendations.
23.1.1 Exploration
1.To confirm historical drilling and potentially define additional Inferred and Indicated Mineral Resources, fan drill holes through the down-dip extension south of the Forbindelses Glacier, where it is possible to install drill pads in the rugged terrain.
2.Carry out additional drilling at the western margin to increase the Inferred Mineral Resource, upgrade current Inferred Mineral Resources to Indicated, further define high-and low-grade areas of mineralization, and delineate barren dyke material more accurately.
3.Using different dips, redrill holes where drilling has intersected barren dyke material.
4.Investigate the potential of titanium, vanadium, gallium, and other metals for their potential extractive value in underground or surface bulk mining studies.
5.Drill the remainder of the 300 m spaced holes, then move to deeper holes on the west side to validate the 1990 and 1994 drill holes.
6.Drill the main shallow part of the deposit at 150 m spacing to ensure that the assessment of low spatial grade variability is correct for an Initial Assessment (IA) level study.
7.Perform a mapping program over Skaergaard, possibly incorporating aerial drone photos, to appraise the dykes.
8.Carry out a program that would incorporate denser drill spacing, study of an initial pilot open pit and transition to underground mining, field reviews of historical drill collar locations, geological and structural mapping, and resampling of surface mineralization to confirm the continuity of the mineralization and potential extensions, as well as the implementation of environmental and social baseline studies, metallurgical test work, for completion of an IA, at an approximate cost of US$15 million.
23.1.2 MRE
1.Investigate other mining scenarios, including open pit and underground bulk mining with potentially lower cut-off grades.
2.Investigate the potential underground bulk mining viability of a thicker H0 horizon selected using a lower NSR cut-off grade.
3.Perform thorough geotechnical investigation to characterize rock and rock mass strength pertinent to mine and infrastructure design, including:
a.Geotechnical mapping of outcropping mineralized and surrounding horizons
b.More thorough geotechnical borehole logging, sufficient to assign Q and/or RMR characterizations
c.Sample collection for geotechnical laboratory testing (UCS, Triaxial etc.)
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
23.1.3 Geology
1.Continue investigation into using magnetic susceptibility (possibly confounded by dyke material) to roughly locate the stratigraphic position of mineralized horizons, both to position sampling and to help correlate mineralized horizons from hole to hole.
2.Use trace element data to help correlate horizons in future models.
3.Update the geological model with projections of the Marginal Border Group.
4.Further refine the bathymetry of the ocean in the Mineral Resource model volume.
5.Conduct further mapping, reconnaissance and aerial photography work to understand dyke distribution and orientations.
6.Harmonize MRE horizon nomenclature with stratigraphic nomenclature in the next MRE.
23.1.4 Topography
1.Obtain an air photograph in late summer when there is minimal snow cover.
23.1.5 Collar Surveys
1.Retain a GIS professional to review the collar positions to ensure that the correct datums and conversions are used for each hole position.
23.1.6 Downhole Surveys
1.Retain a dedicated geological technician for subsequent drill programs to check the orientation of each hole before drilling and perform the continuous downhole surveys at drilling completion as a QC check and superseding survey to those performed during drilling.
23.1.7 Channels
1.Collect additional channel samples to support existing channel information, where safely achievable.
23.1.8 Database
1.Digitize historical hard copy density data.
2.Migrate the Skaergaard database to an industry-specialized geodatabase software package which includes validated imports for log, survey, and assay information.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
1.Update the Project database with separate PGE-Au and trace element tables based on different assay priorities in the compiled, overlapping raw assay table.
2.Perform a full database compilation from the various historical and current source components in different formats, and then migrate the datasets to an industry-standard GIMS prior to the next MRE. All available densities should be incorporated into a separate table.
3.Complete an exhaustive search of all compiled files and reports, including internal report appendices, for more assay certificates, and audit any additional found information against the historical sample ID and grade information contained in the Project database, ensuring that certificate records exactly match those of the database.
4.Review/relog extant core where data, e.g., lithology, is missing.
5.Centralize the drill core to one secured location, to achieve a complete and coherent physical database for the deposit.
23.1.9 QA/QC and Assay Verification
1.Relog or check-log any extant drill core. Locate and investigate unsampled intervals for core sampling.
2.Consider searching for and assaying unsampled intervals in the extant core located in various places.
3.Continue to review all CRMs for appropriateness, and source an alternative mid-grade platinum and palladium CRM with a more appropriate matrix for future drill programs.
4.Complete incorporation of multi-element assays into the Mineral Resource database in Leapfrog, in order to perform various internal studies and to determine correlations between other elements and mineralization/stratigraphy.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
23.2 Proposed Program and Budget
In SLR’s opinion, Skaergaard is in a prospective geological environment and further exploration is warranted. PGE-Au mineralization has been delineated by previous drilling and historical exploration. The continued application of modern-day exploration techniques focusing on diamond drilling, are recommended to confirm the width, length, and grades of mineralization at the Project followed by an updated Mineral Resource estimate and IA using updated metal price forecasts to determine potential for eventual economic extraction. SLR concurs with the proposed work as noted below.
23.2.1 Program for IA and Support Work Toward PFS
The primary objectives of the program proposed by GMRL are to advance the Project with environmental and social baseline studies, as well as additional metallurgical test work, working towards a Pre-feasibility Study (PFS). DDH locations would be proposed based on the results of the Mineral Resource estimate 2026.
The program proposed by GRML would also be to advance the Project by upgrading Indicated Mineral Resource into Measured Mineral Resource; Inferred Mineral Resources into Indicated Mineral Resources, and define the Mineral
Resource potential for an initial pilot open pit at the east side of the Forbindelses Glacier close to Miki’s Fjord. This would be followed by underground mining which also will be supported by the data obtained by this program.
GRML should also assess potential credits in other potential payables, such as iron, titanium, vanadium, gallium, and other metals, to increase the mineable widths of the mineralized horizons.
GRML’s exploration and resource expansion program would include diamond drilling to upgrade Mineral Resource classes, as well as for metallurgical test work purposes. Metallurgical test work will analyze a representative set of extant available drill core from GRML’s drilling as well as blasted bulk material at surface. SLR and others will assist GMRL with the metallurgical evaluation of material from the Project and flowsheet development to ultimately support a PFS for the Project. The work will include a review of previous test work reports and the development of a test work program. The objective of the test work program will be to confirm a flowsheet that can be taken forward into the next phase of test work to support a PFS, which would further involve optimization of test (processing) conditions and variability test work.
Following the 2026 MRE, the DDH locations would be positioned to maximize the geological certainty and analytical opportunity for geotechnical and metallurgical study. Additional tasks would include field reviews of historical drill collar locations, geological and structural mapping, and resampling of surface mineralization to confirm the continuity of the mineralization and potential extensions, as well as the implementation of environmental and social baseline studies, metallurgical test work, and completion of an IA.
Details of the proposed program are proposed in Table 23-1 with a total budget of approximately US$15 million.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Table 23-1: Proposed Program and Budget
| | | | | |
| Item / Detail | Estimated Cost |
| (US$000) |
| Logistics and Administration | |
| Mobilization/Demobilization | 385 |
| Helicopter Support | 775 |
| Supplies and Communications | 200 |
| Air/Sea Transport and Ship Accommodations | 1,550 |
| Camp Logistics Personnel | 200 |
| Sub-Total Logistics and Administration | 3,110 |
| |
| Drilling | |
| Resource Uplift and Metallurgical Drilling (10,000 m @ ~US$775/m) | 7,750 |
| QA/QC Materials and Supplies | 125 |
| Shipping | 200 |
| Professional Personnel (Geologists, Geotech, Surveying) | 450 |
| Sampling Preparation and Analyses | 775 |
| Sub-Total Drilling | 9,300 |
| |
| Studies | |
| Environmental and Social Baseline Studies | 500 |
| Metallurgical Testing and Assistance | 1,000 |
| Updated Mineral Resource Estimate | 200 |
| Initial Assessment (IA) | 400 |
| Preliminary Feasibility Study (PFS) Support Work | 500 |
| Sub-Total Studies | 2,600 |
| |
| Proposed Program Total | 15,010 |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
24.0 References
Anderson et al. 1998. The Triple Group and Platinova gold and pallidum reefs in the Skaergaard Intrusion; stratigraphic and petrographic relations. Economic Geology, v93, p448-509
Arctic Today: https://www.arctictoday.com/a-controversial-greenland-mining-project-has-passed-a-key-regulatory-hurdle-and-heads-for-public-comment.html
Bird, D.K., Brooks, C.K., Gannicott, R.A., and Turner, P.A., 1991, A Gold Bearing Horizon In The Skaergaard Intrusion, East Greenland. Economic Geology Vol. 86, 1991, pp. 1083-1092Canadian Institute of Mining, Metallurgy and Petroleum (CIM), 2014, CIM Definition Standards for Mineral Resources and Mineral Reserves, adopted by the CIM Council on May 10, 2014.
Conico Ltd. 2021. https://www.conico.com.au/projects/greenland-ryberg/
Douglas, S. 2018 to 2020, 2017 to 2019. Audited Financial Statements for Exploration Licence No. 2007/01 and Exploration Licence No. 2012/25. Prepared for Platina Resources Limited by Bentleys Brisbane (Audit) Pty Ltd
Geological Survey of Denmark and Greenland. Ministry of the Environment. 2007. V, Ga and Ge in Skaergaard PGE Ore. Determination of vanadium content of titanomagnetite and gallium and germanium in rock forming minerals from the Au-PGE reef in the Skaergaard Intrusion.
GEUS. 2020. Geological Survey of Denmark and Greenland (GEUS) and the Ministry of Mineral Resources under the Government of Greenland (MMR), Graphical Information System Portal, http://maps.greenmin.gl/
Major Precious Metals Corp. 2021. Skaergaard Project 2021, Sampling and Shipping Procedures and Guidelines for Diamond Drill Core.
McBirney, A.R. 1989. Geological map of the Skaergaard intrusion, est Greenland, 1:20,000: Department of Geology, University of Oregon.
Mining See: https://www.miningsee.eu/mining-in-greenland-environmental-frontline-of-global-warming/
Naalakkersuisut government: https://govmin.gl/about-us/organizational-structure/
Nielsen T.F.D. 2006. A world class deposit in the Skaergaard intrusion. Geological Survey of Denmark and Greenland Fact sheet No. 13 Greenland Mineral Resources.
Per, K. 2015. Greenland Mineral Occurrence Map, Occurrence data sheet GEUS Occurrence id: 17
Platina Resources Limited. 2019. Skaergaard Scoping Study.
Roscoe Postle Associates Inc. 2005. Technical Report on the Mineral Report on the Mineral Resource Estimate for the Skaergaard PGM-Au-Fe-Ti Deposit, Greenland Prepared for Skaergaard Minerals Corporation.
SLR. 2021. Technical Report on the Skaergaard Project, Southeastern Greenland, Report for NI 43-101. Prepared for Major Precious Metals Corp., May 25, 2021.
SLR. 2022. Technical Report on the Skaergaard Project, Southeastern Greenland, Report for NI 43-101. Effective Date: November 22, 2022. Prepared by SLR Consulting (Canada) Ltd. For Major Precious Metals Corp. November 30, 2022.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Snowden. 2012. Resource Estimate on the Platina Resources Skaergaard Project
Space Daily: https://www.spacedaily.com/afp/210217014753.q51vnpxn.html
SRK Consulting. 2008. Scoping Study on the Skaergaard Deposit, Greenland
SRK Consulting. 2019. Scoping Study
Steffen, Robertson and Kirsten (UK) Ltd (SRK). 2004. A technical Report Supporting an Inferred Mineral Resource for the Skaergaard Project, Eastern Greenland (May 2004).
TRT World: https://www.trtworld.com/magazine/mining-project-triggers-political-turmoil-in-greenland-44254
Wardell Armstrong International Ltd. (WAI). 2013. Updated Resource Estimate for the Skaergaard PGM-Au-Fe-Ti Deposit, Eastern Greenland for Platina Resources Limited.
Yahoo News: https://news.yahoo.com/mining-fuels-greenland-dreams-independence-014749940.html
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
25.0 Reliance on Information Provided by the Registrant
This TRS has been prepared by SLR for GRML. The information, conclusions, opinions, and estimates contained herein are based on:
•Information available to SLR at the time of preparation of this TRS.
•Assumptions, conditions, and qualifications as set forth in this TRS.
•Data, reports, and other information supplied by GRML and other third party sources.
For the purpose of this TRS, SLR has relied on ownership information provided by GRML in a legal opinion by Cyruli Shanks & Zizmor LLP, dated July 13, 2026, entitled ‘Re: Greenland Mines Ltd. Technical Report Summary’. SLR has not researched property title or mineral rights for the Skaergaard Project, as SLR considers it reasonable to rely on GRML’s legal counsel, who is responsible for maintaining this information.
The Qualified Persons have taken all appropriate steps, in their professional opinion, to ensure that the above information from GRML is sound.
Except as provided by applicable laws, any use of this TRS by any third party is at that party’s sole risk.
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
26.0 Date and Signature Page
This report titled “S-K 1300 Technical Report Summary, Skaergaard Project, Greenland” with an effective date of July 3, 2026 was prepared and signed by:
(Signed) SLR Environmental Consulting (Ireland) Ltd
| | | | | |
| Dated at Dublin, Ireland | |
| July 13, 2026 | SLR Environmental Consulting (Ireland) Ltd |
| | | | | |
| Greenland Mines Ltd. | Skaergaard Project | July 13, 2026 |
| S-K 1300 Technical Report Summary | SLR Project No.: 501.066176.00001 |
Making Sustainability Happen
Greenland Mines Ltd.
S-K 1300 Technical Report Summary:
Sarfartoq Rare Earths Project, West Greenland
PREPARED FOR GREENLAND MINES LTD. VANCOUVER, BC, CANADA
EFFECTIVE DATE: JULY 31, 2026
PREPARED BY:
RONALD G. SIMPSON, P.GEO (GEOSIM SERVICES INC.) HASSAN GHAFFARI, P.ENG., M.A.SC. (TETRA TECH CANADA INC.)
Tetra Tech Canada Inc.
Suite 1000 10th Floor, 885 Dunsmuir Street
Vancouver, BC V6C 1N5 CANADA Tel 604.685.0275 Fax 604.684.6241
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
TABLE OF CONTENTS
1.0 EXECUTIVE SUMMARY 1
1.1 Introduction 1
1.2 History 1
1.3 Geology and Mineralization 1
1.4 Metallurgical Testing 2
1.5 Mineral Resource Estimate 2
1.5.1 Underground Mining Scenario 3
1.5.2 Open Pit Mining Scenario 4
1.5.3 Hybrid Mining Scenario 5
1.6 Interpretation and Conclusions 6
1.7 Recommendations 7
2.0 INTRODUCTION 8
2.1 Background 8
2.2 Terms of Reference 8
2.3 Sources of Information and Data 11
2.4 Qualified Persons and Details of Personal Inspection 11
3.0 PROPERTY DESCRIPTION 13
3.1 Project Location 13
3.2 Mineral Rights 13
3.2.1 Mineral Claims, Licenses, and Leases 15
3.2.2 Surface Rights and Leases 16
3.3 Property Encumbrances 17
3.4 Royalties or Similar Interests 19
4.0 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE, AND
PHYSIOGRAPHY 20
4.1 Topography and Elevation 20
4.2 Accessibility 20
4.3 Climate 21
4.4 Local Resources and Infrastructure 21
4.5 Seismicity 22
5.0 HISTORY 23
5.1 Rare Earth and Specialty Metals Exploration 23
5.2 Diamond Exploration 24
6.0 GEOLOGICAL SETTING, MINERALIZATION, AND DEPOSIT 27
6.1 Regional Geology 27
6.2 Local and Property Geology 29
6.2.1 Rock Units 29
6.2.2 Structural Analysis 32
7.0 EXPLORATION 42
7.1 Rare Earth Exploration 42
7.2 Sampling and Prospecting 43
7.3 Geophysics 51
7.4 Drilling 62
7.4.1 Collar and Down Hole Surveys 70
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | i | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
7.4.2 ST40 Drill Results 76
7.4.3 ST1 Drill Results 77
7.4.4 ST19 Drill Results 78
7.4.5 Other Drill Results 79
7.5 Bulk Sampling 80
7.5.1 Sampling Method and Approach 81
7.5.2 Sample Interval 82
7.5.3 Chain of Custody 82
8.0 SAMPLE PREPARATION, ANALYSES, AND SECURITY 83
8.1 Sample Preparation 83
8.2 Laboratory Method 83
9.0 DATA VERIFICATION 84
9.1 Standards 84
9.2 Blanks 87
9.3 Field Duplicates 88
9.4 Check Assays 95
9.5 Core Recovery 102
9.6 Site Visits 102
9.7 Database Verification 103
9.8 Conclusions 103
10.0 MINERAL PROCESSING AND METALLURGICAL TESTING 104
10.1 2026 SGS Mineral Beneficiation Test Work 104
10.1.1 Head Minerology 104
10.1.2 Grindability Test 104
10.1.3 Sorting Amenability Test Work 105
10.1.4 Magnetic Separation Test Work 105
10.1.5 Bench Scale Flotation Test Work 105
10.1.6 Conclusions 108
10.2 2023 Mineralogical Characterization of Sarfartoq Samples 109
10.2.1 2023 Mariano Preliminary Mineralogical Analysis 109
10.2.2 2023 XPS Mineralogical Analysis 110
10.2.3 Conclusions 111
10.3 2019 SGS Scoping Rare Earth Leaching Test Work 111
10.3.1 Atmospheric Acid Leaching (AL) of Flotation Concentrate 112
10.3.2 Acid Baking (AB) followed by Water Leaching (WL) 114
10.3.3 Two-Stage Leaching 116
10.3.4 Conclusions 117
10.4 Early Test Work 117
11.0 MINERAL RESOURCE ESTIMATES 118
11.1 Key Assumptions/Basis of Estimate 118
11.2 Deposit Modelling 119
11.3 Exploratory Data Analysis 120
11.4 Analysis of Outliers 121
11.5 Density 122
11.6 Variogram Analysis 122
11.7 Block Model and Grade Estimation Procedures 123
11.8 Mineral Resource Classification 128
11.9 Block Model Validation 129
11.10 Reasonable Prospects of Economic Extraction 132
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | ii | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
11.10.1 Price Deck 132
11.10.2 Recovery Assumptions, Royalty, and Other Deductions 132
11.10.3 NSR Calculation Methodology 133
11.10.4 TREO % Calculation Methodology 134
11.10.5 Cost Assumptions 135
11.10.6 Underground Optimization Methodology 136
11.10.7 Open Pit Optimization Methodology 136
11.10.8 Hybrid Optimization Methodology 136
11.11 Mineral Resource Summary 137
11.11.1 Underground Mining Scenario 138
11.11.2 Open Pit Mining Scenario 138
11.11.3 Hybrid Mining Scenario 139
11.12 Factors That May Affect the Mineral Resource Estimate 140
12.0 MINERAL RESERVE ESTIMATES 141
13.0 MINING METHODS 142
14.0 PROCESS AND RECOVERY METHODS 143
15.0 INFRASTRUCTURE 144
16.0 MARKET STUDIES 145
17.0 ENVIRONMENTAL STUDIES, PERMITTING, AND PLANS, NEGOTIATIONS, OR
AGREEMENTS WITH LOCAL INDIVIDUALS OR GROUPS 146
17.1 Environmental Setting 146
17.2 Environmental Baseline Programme (2023 & 2026) 146
17.3 Radiological Setting 147
17.4 Protected Areas and Cultural Heritage 148
17.5 Waste Rock, Tailings, Water and Closure 148
17.6 Permitting Framework and Status of Approvals 148
17.7 Social Baseline, Community Engagement and Impact Benefit Agreement 150
17.8 Qualified Person's Opinion 150
18.0 CAPITAL AND OPERATING COSTS 151
19.0 ECONOMIC ANALYSIS 152
20.0 ADJACENT PROPERTIES 153
20.1 Active Adjacent Licenses 153
20.2 White Mountain Anorthosite Mine (Lumina Sustainable Materials A/S) - Closest Operating Mine (MIN
2015-39) 155
20.3 Immediate Neighbour - Arcticulture ApS (MEL 2024-128) 155
20.4 Regional Exploration License (Nuuk Region) (MEL 2026-41) 155
20.5 Small-scale (§33) Licenses (NATS 2025-13 and NATS 2026-20) 156
21.0 OTHER RELEVANT DATA AND INFORMATION 157
22.0 INTERPRETATION AND CONCLUSIONS 158
23.0 RECOMMENDATIONS 159
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | iii | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
24.0 REFERENCES 161
25.0 RELIANCE ON INFORMATION PROVIDED BY THE REGISTRANT 165
26.0 DATE AND SIGNATURE PAGES 166
LIST OF TABLES
Table 1-1 REO Price Assumptions 2
Table 1-2 Cost Assumptions Underground and Open Pit Mining 3
Table 1-3 Stope Design Parameters 3
Table 1-4 Underground Mineral Resource 4
Table 1-5 Open Pit Optimization Parameters 4
Table 1-6 Open Pit Mineral Resource 5
Table 1-7 Hybrid Optimization Parameters 5
Table 1-8 Hybrid Mineral Resource 6
Table 2-1 Acronyms and Abbreviations 8
Table 2-2 Rare Earth Oxide and Specialty Metal Conversion Factors 11
Table 2-3 Summary of Technical Contributors 12
Table 3-1 Mineral Tenure Summary 15
Table 3-2 Coordinates for MEL 2020-32 16
Table 4-1 Overview of Population Centres and Local Available Potential Workforce in the Sarfartoq/
Kangerlussuaq Region 22
Table 7-1 Thoron Pair Duplicate Results 58
Table 7-2 Thoron Pair Blank Results 59
Table 7-3 Significant Intercepts in Historic Core Holes 64
Table 7-4 Significant Intercepts, 2023 67
Table 7-5 Significant Nb Intercepts in 2023 69
Table 7-6 Sarfartoq REE Drillhole Collar Data 70
Table 9-1 Analysis of Certified Standards vs Standards Submitted into Drill Program 85
Table 9-2 Certified Values for the SAFR-1 CRM 86
Table 9-3 ALS Results for SARF-1 CRM 86
Table 9-4 Actlabs Results for SARF-1 CRM 86
Table 9-5 ALS Results for Blanks 87
Table 9-6 Actlabs Results for Blanks 88
Table 9-7 September 2010 Site Visit Check Sample Results 102
Table 10-1 Bond Ball Mill Grindability Test Results 105
Table 10-2 XRD Reitveld Analysis Results for all three REO Concentrates 111
Table 10-3 Summary of Feed Samples and Head Assays for Leaching Test Work 112
Table 11-1 ST1 Drilling Summary 118
Table 11-2 ST1 Lithologic Codes 118
Table 11-3 Composite Statistics Carbonatite Domain 121
Table 11-4 Composite Statistics Gneiss Domain 121
Table 11-5 Block Model Parameters 123
Table 11-6 ID2 Grade Estimation Parameters 124
Table 11-7 Global Mean Grade Comparison Carbonatite Domain 129
Table 11-8 Global mean grade comparison Gneiss Domain 129
Table 11-9 REO Price Assumptions 132
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | iv | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Table 11-10 NSR Parameters 133
Table 11-11 Cost Assumptions Underground and Open Pit Mining 135
Table 11-12 Stope Optimization Parameters 136
Table 11-13 Open Pit Optimization Parameters 136
Table 11-14 Hybrid Optimization Parameters 137
Table 11-15 Underground Mineral Resource 138
Table 11-16 Open Pit Mineral Resource 139
Table 11-17 Hybrid Mineral Resource 139
Table 20-1 Overview of Active Adjacent Licenses to Sarfartoq 153
LIST OF FIGURES
Figure 3-1 Location of Sarfartoq Rare Earths Project, Greenland 14
Figure 3-2 MEL 2020-32 in blue and the Arnangarnup Qoorua protected area in red 17
Figure 6-1 Regional Geology 27
Figure 6-2 Geology of the Sarfartoq Carbonatite Complex, from Secher et al. (1986) 28
Figure 6-3: Regional Magnetic Map Showing the Carbonatite Near the Center of the Image 29
Figure 6-4 Geologic Map of the Sarfartoq Carbonatite Complex 31
Figure 6-5 Foliation 33
Figure 6-6 Stereonet: Quartz Veins 34
Figure 6-7 Veins 35
Figure 6-8 Carbonatite Dikes 37
Figure 6-9 Stereonets: Carbonatite Dikes (l) and Non-Carbonatite Dikes (r) 38
Figure 6-10 Stereonets: Contact (l) and Faults (r) 38
Figure 6-11 Joints 39
Figure 6-12 Stereonet: All Joints 40
Figure 6-13 Stereonets: Joints by Rock Unit 41
Figure 7-1 Rock Chip Sample Results, 2024 44
Figure 7-2 Thematic Results for Historic Rock Chip Samples 45
Figure 7-3 Soil Geochemistry Results, 2023 - 2024 46
Figure 7-4 Nd in Soil 47
Figure 7-5 Dy in Soil 47
Figure 7-6 Thematic Historic Rock Chip Sample Results for the ST1 Zone 48
Figure 7-7 Results of Samples Collected Previously at the ST40 Zone 49
Figure 7-8 Thematic Sample Results for the ST19 Zone 50
Figure 7-9 Airborne Thorium Radiometrics, NMR (1999) 52
Figure 7-10 Airborne Magnetics, NMR (1999) 53
Figure 7-11 Drilling and Magnetics (MVI Amplitude) at ST1 54
Figure 7-12 Ground Magnetics 54
Figure 7-13 Ground Gravity Survey 55
Figure 7-14 ST40 Drilling Superimposed on Density 56
Figure 7-15 ST40 Drill Intercepts Associated with a Break in a Density High 57
Figure 7-16 ST1 Resource Drilling Between Density Highs 57
Figure 7-17 Thoron Pair Duplicate Results 59
Figure 7-18 Thoron Pair Results ST1 to ST40 60
Figure 7-19 Thoron Pair Results ST24 61
Figure 7-20 Ground Gamma Survey Results (2023 - 2024) 62
Figure 7-21 Drillhole Locations on the Sarfartoq Project 75
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | v | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Figure 7-22 Drillhole Locations at the ST40 Zone 76
Figure 7-23 Drillhole Locations at the ST1 Zone 77
Figure 7-24 Chondrite Normalized REE Distribution of the ST1 Resource and SAR23-16 Intercepts...78
Figure 7-25 Drillhole Locations at the ST19 Zone 79
Figure 7-26 1 Drillhole Locations on the ST31 Zone 80
Figure 9-1 REE Field Sample Verification (Duplicates) 89
Figure 9-2 REE Lab Sample Verification (Prep Duplicates) 89
Figure 9-3 REE Lab Sample Verification (Pulp Duplicates) 90
Figure 9-4 Field Duplicates: Lanthanum Duplicates 91
Figure 9-5 Field Duplicates: Lanthanum Variance 91
Figure 9-6 Field Duplicates: Cerium Duplicates 92
Figure 9-7 Field Duplicates: Cerium Variance 92
Figure 9-8 Field Duplicates: Praseodymium Duplicates 93
Figure 9-9 Field Duplicates: Praseodymium Variance 93
Figure 9-10 Field Duplicates: Neodymium Duplicates 94
Figure 9-11 Field Duplicates: Neodymium Variance 94
Figure 9-12 Check Analyses: Lanthanum Correlation 96
Figure 9-13 Check Analyses: Lanthanum Variance 96
Figure 9-14 Check Analyses: Cerium Correlation 97
Figure 9-15 Check Analyses: Cerium Variance 97
Figure 9-16 Check Analyses: Praseodymium Correlation 98
Figure 9-17 Check Analyses: Praseodymium Variance 98
Figure 9-18 Check Analyses: Neodymium Correlation 99
Figure 9-19 Check Analyses: Neodymium Variance 99
Figure 9-20 Check Analyses: Sm to Lu and Y 100
Figure 9-21 Check Analyses: Niobium 101
Figure 9-22 Check Analyses: Thorium 101
Figure 9-23 Check Analyses: Uranium 101
Figure 10-1 Modal Mineralogy and REE Mineral Content Comparing Three Samples 110
Figure 10-2 Extraction Results of AL1, AL2 and AL4 Tests 113
Figure 10-3 Comparison of REE Extraction from Direct Acid Bake and Pre-leach Followed by Acid
Bake 115
Figure 11-1 Lithologic Model of Carbonatite 119
Figure 11-2 Carbonatite Model and 0.5% TREO Grade Shell in Gneiss Complex 120
Figure 11-3 Cumulative Probability Plots 122
Figure 11-4 Variogram Models - Nd2O3 Carbonatite Domain 123
Figure 11-5 TREO Block Grades - 570 Level 125
Figure 11-6 TREO Block Grades - Section 485100 126
Figure 11-7 TREO Block Grades - Section 7378280N 127
Figure 11-8 TREO Block Grades - Perspective View Looking North 128
Figure 11-9 30 m Swath Plot X Drift Nd2O3 130
Figure 11-10: 30 m Swath Plot X Drift Pr6O11 130
Figure 11-11: 30 m Swath Plot Y Drift Nd2O3 131
Figure 11-12: 30m Swath Plot Y Drift Pr6O11 131
Figure 11-13 : Isometric Long Section looking NW Perpendicular to Deposit Strike 137
Figure 20-1 Overview of Adjacent Exploitation and Exploration Licenses to the Sarfartoq Project.
Small-scale Mining Licenses are also Indicated Together with Protected Areas 154
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | vi | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
1.0 EXECUTIVE SUMMARY
1.1 Introduction
Tetra Tech Canada Inc. (Tetra Tech) and Geosim Services Inc. (Geosim) were retained by Greenland Mines Ltd (GRML) (the “Company” or the “Registrant”) to prepare an independent, S-K 1300 compliant technical report summary (TRS) for the Sarfartogq Rare Earths Project (the “Project”). The purpose of this TRS is to inform the ST1 Mineral Resource presented in this technical report. The mineralized Sarfartoq Property (the “Property) includes a 191.29 km2 mineral exploration license (MEL 2020-32) in southwest Greenland, hosted in a large Proterozozoic carbonatite complex covering approximately 90 km2. Primary host minerals include Bastnasite, monazite, and pyrochlore bearing zones with key commodities: Nd, Pr, DY, Rb (magnet rare earth elements (REE)), plus La and Ce. Other resources in the license area include Nb, Ta, P and diamonds.
GMRL is a public company listed on the NASDAQ (NSADAQ: GRML). GMRL signed a definitive agreement on 20th of May 2026, to acquire Neo North Star Resources Inc. (NNSR), former owner of the Sarfartoq Project.
1.2 History
The Sarfartoq Carbonatite Complex (SCC) was discovered by GGU (Danish Geological Survey, now GEUS Geological Survey of Denmark and Greenland) geologists after a field investigation following a regional airborne radiometric survey conducted in 1976. Most of the work on the ST-1 zone was carried out by Hudson Resources Ltd. ((Hudson’) between 2009 and 2012. In 2023, Hudson transferred the Sarfartog mineral exploration license MEL 2020-32 to NNSR. Metallurgical testing resumed, utilizing material left from the previous Hudson program. Exploration activities resumed in 2023 and continued in 2024. The full Project database now comprises 161 drill holes for 35,843 m, of which 94 holes (23,094 m) inform this ST1 Mineral Resource estimate.
1.3 Geology and Mineralization
The SCC is interpreted to straddle the boundary between the Archean craton and the Paleoproterozoic aged Nagssugtoqidian mobile belt. The host rocks are granite and granodiorite gneisses cut by a swarm of Paleoproterozoic diabase dikes called the Kangamiut dike swarm. Age determinations indicate an age of 565 Ma for emplacement of the SCC.
The SCC is sub-circular to oval in shape and has an influence up to 12 km from the core. It has a conical structure with a magnetic core (Figure 6-3) consisting of apatite and magnetite rich ferrocarbonatites. The core is surrounded by narrow close-lying concentric carbonatite sheets with interleaved screens of fenitized/altered country rock, and with a partial rim of sodic fenite. The dominant carbonatite type is ferrocarbonatite with rauhaugite (ankerite dominant) in the core and beforsite (ferrodolomite dominant) in the marginal dikes. Calciocarbonatite (sovite, calcite rich) only occurs as subordinate units in the core. The most common alteration encountered is light-grey and aegirine bearing fenite.
The Nd-Pr REE mineralized ST1 zone that is the in focus for this report is one of several mineralized targets on the outer-ring structure of the Sarfartoq Carbonatite Complex. ST1 represents the most studied and developed target with historical mineral resource estimates.
1.4 Metallurgical Testing
Metallurgical test work completed between 2011 and 2026 included mineralogical characterization, beneficiation, and hydrometallurgical studies on Sarfartoq rare earth mineralization. The results demonstrated significant variability in both mineralogy and metallurgical response among the tested composite samples. Rare earth
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 1 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
mineralization occurs within a complex assemblage of carbonate and phosphate minerals, including monazite, bastnaesite, synchysite/parisite, ancylite, carbocernaite, and burbankite-group minerals.
Beneficiation studies identified flotation as the most effective method for upgrading rare earth mineralization. Ore sorting and magnetic separation showed limited potential, whereas flotation testing demonstrated that recoveries and concentrate grades were strongly influenced by mineralogy, grind size, reagent selection, pulp density, and pulp temperature. Under optimized conditions, the ST1 Composite achieved the best flotation performance, producing concentrates grading approximately 19-20% TREO at recoveries of approximately 57-58%.
Hydrometallurgical test work demonstrated that high rare earth recoveries can be achieved through thermal and acid treatment routes. Roasting followed by hydrochloric acid leaching achieved recoveries of up to approximately 96% Nd and 97% Dy, while acid baking followed by water leaching also produced high recoveries. Two-stage leaching with alkaline metathesis further increased recoveries to approximately 98-99% Nd and 92-98% Dy. Overall, the test work indicates that a process flowsheet incorporating flotation concentration followed by roasting or acid baking and leaching represents the most promising approach for the recovery of REE from the Sarfartoq Deposit.
1.5 Mineral Resource Estimate
This Sarfartoq ST-1 Zone mineral resource estimate is based on analytical data from 94 core holes representing 23,094 m of drilling carried out between 2009 and 2023.
Mineral resources are reported independently for three scenarios: an underground scenario, a surface open pit scenario and a hybrid open pit and underground scenario.
The REOs used for reporting purposes are Pr6O11, Nd2O3, Sm2O3, Eu2O3, Gd2O3, Tb4O7, Dy2O3, and Y2O3. The other REOs (La2O3 and Ce2O3) contained in the deposit were estimated but considered to have no significant value. Price assumptions are presented in Table 1-1.
Table 1-1 REO Price Assumptions
| | | | | | | | | | | | | | | | | |
REE Oxide | Price US$/kg |
| Pr6O11 | |
| $145.00 |
|
| Nd2O3 | | | $150.00 | |
| Sm2O3 | |
| $10.00 |
|
| Eu2O3 | | | $30.00 | |
| Gd2O3 | |
| $225.00 |
|
| Tb4O7 | | | $3,500.00 | |
Dy2O3 |
| $750.00 |
|
| Y2O3 | | | $16.00 | |
The NSR cost assumptions for both mining scenarios are presented in Table 1-2.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 2 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Table 1-2 Cost Assumptions Underground and Open Pit Mining
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Operating Cost Assumptions Underground Mining | |
| | Operating Cost Assumptions Open Pit Mining Scenario |
Scenario |
|
| Parameter | | | Value | | | Unit | |
| | Parameter | | | Value | Unit |
Mining | $55.00 | | US$/t | |
| Mining | $6.00 | US$/t mined* |
mined* |
|
Processing | $69.72 | US$/t processed |
| Processing | $69.72 | US$/t processed |
G&A | $16.50 | | US$/t | |
| G&A | $16.50 | US$/t processed |
processed |
|
| UG Breakeven Cut-off | | $141.22 | US$/t |
| OP Breakeven Cut-off | $92.22 | US$/t |
*US$/t mined is mined tonnes without dilution
The resulting cost assumptions were adopted for the development of reporting cut-offs and optimization studies for both the open pit and underground resource scenarios.
1.5.1 Underground Mining Scenario
Conceptual underground mine design was carried out using Deswik software. Stope design parameters are shown in Table 1-3.
Table 1-3 Stope Design Parameters
| | | | | | | | | | | | | | | | | | | | | | | |
| Parameters | | | Min | | | Max |
| Stope Height (m) | | 20 |
| 20 |
| Stope Length (m) | | | 10 | | | 10 |
| Stope Width (m) | | 3 |
| 10 |
| Sub-Stoping Factor | | | 0.5 | | | 0.5 |
| Dilution | | 0 |
| 0 |
Table 1-4 presents the mineral resource estimate for the ST1 zone assuming an underground mining scenario. Table 1-1 and Table 1-2 present the price and cost assumptions used to determine the base case NSR cut-off of $141.22/t.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 3 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Table 1-4 Underground Mineral Resource
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
| |
|
| |
|
| Magnet Basket |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| | Full Basket | |
|
|
|
|
|
|
|
|
|
|
|
|
| TREO % |
|
|
|
| Ore |
|
|
|
|
|
|
|
| Tonnes |
|
| TREO |
| | Pr6O11 | | | Nd2O3 | | | Tb4O7 ppm | Dy2O3 ppm | | Eu2O3 | | | Gd2O3 | | Sm2O3 ppm | | Y2O3 | | | Ce2O3 ppm | La2O3 ppm | |
| Class |
|
| (000's) |
|
| % |
| ppm | ppm | ppm | ppm | ppm |
| Indicated | | | 7,475 | | | 1.56 | | | 944 | | | 3,009 | | | 13.0 | 31.8 | | 66.9 | | | 160 | | 298 | | 63.7 | | | 7,784 | 3,268 | |
Inferred | 2,603 | 1.36 | 774 | 2,443 | 9.3 | 25.9 | 51.6 | 113 | 231 | 57.0 | 6,764 | 3,092 |
|
| Total | | | 10,078 | | | 1.51 | | | 900 | | | 2,863 | | | 12.1 | 30.3 | | 62.9 | | | 148 | | 281 | | 62.0 | | | 7,520 | 3,222 | |
Notes:
1. Mineral resource estimate prepared by Ronald G. Simpson of GeoSim Services Inc. with an effective date of July 31st, 2026.
2. Mineral Resources are estimated consistent with CIM Definition Standards and reported in accordance with S-K 1300.
3. Mineral resources are not mineral reserves and do not have demonstrated economic viability.
4. Mineral resources are stated using the following assumptions: REO prices as listed in Table 1-1; assumed deductions of metallurgical recovery of 64%, payability of 60%, royalties of 5%, and insurance of 0.5%; underground mining costs of US$55 per tonne; processing costs of US$69.72 per tonne; G&A of US$16.50/t and using the full basket NSR optimization.
5. The base case NSR cut-off of $141.22/t is believed to provide a reasonable margin over operating for underground mining and processing
6. Totals may not sum due to rounding.
1.5.2 Open Pit Mining Scenario
Open pit optimization was carried out using Datamine’s Studio NPVS software version 3.0. Parameters are presented in Table 1-5.
Table 1-5 Open Pit Optimization Parameters
| | | | | | | | | | | | | | | | | | | | |
| Parameter | | Value | | Unit | |
| Overall Slope Angle | 45 | degrees |
|
| Plant Recovery | | 64 | | % | |
| Plant Feed Rate | 700,000 | tpa |
|
| Payability | | 60 | | % | |
| Royalties on Revenue | 5% |
|
| Insurance on Revenue | | 0.5 | | % | |
| NPV Discount Rate | 8% |
|
Table 1-6 presents the mineral resource estimate for the ST1 zone assuming an open pit mining scenario. Table 1-1 and Table 1-2 list the price and cost assumptions used to determine the base case NSR cut-off of $92.22/t.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 4 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Table 1-6 Open Pit Mineral Resource
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
Class | Ore Tonnes (000s) | TREO % | | Magnet Basket | |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Full Basket | |
|
|
|
|
| TREO % |
Pr6O11 ppm | Nd2O3 ppm | Tb4O7 ppm | Dy2O3 ppm | Eu2O3 ppm | Gd2O3 ppm | Sm2O3 ppm | Y2O3 ppm | Ce2O3 ppm | La2O3 ppm |
Indicated | 6,608 | 1.63 | 979 | 3,114 | 13.5 | 32.9 | 69.0 | 168 | 307 | 65 | 8,108 | 3,444 |
Inferred | 6,015 | 0.88 | 516 | 1,648 | 6.9 | 18.9 | 36.3 | 82 | 164 | 44 | 4,304 | 1,893 |
| Total | | | 12,623 | | | 1.27 | | | 758 | | | 2,415 | | | 10.4 | | | 26.2 | | | 53.4 | | | 127 | | | 239 | | 55 | | | 6,295 | | 2,705 |
Notes:
1. Mineral resource estimate prepared by Ronald G. Simpson of GeoSim Services Inc. with an effective date of July 31st, 2026.
2. Mineral Resources are estimated consistent with CIM Definition Standards and reported in accordance with S-K 1300.
3. Mineral resources are not mineral reserves and do not have demonstrated economic viability.
4. Mineral resources are constrained by an optimized pit shell using the following assumptions: REO prices as listed in Table 1-1; assumed deductions of metallurgical recovery of 64%, payability of 60%, royalties of 5%, and insurance of 0.5%, open pit mining costs of US$6 per tonne; processing costs of US$69.72 per tonne; G&A of US$16.5/t and using the full basket NSR optimization.
5. The base case NSR cut-off of $92.22/t is believed to provide a reasonable margin over operating costs for open pit mining and processing
6. Totals may not sum due to rounding.
1.5.3 Hybrid Mining Scenario
A conceptual hybrid scenario was run independently of the underground and open pit scenarios. Parameters are identical to the other two independent methods with the addition of an underground development cost to account for the transition between open pit and underground. An exclusion zone was also included to represent the non-recoverable ore that lies between the open pit and the underground resources. The hybrid parameters are presented in Table 1-7.
Table 1-7 Hybrid Optimization Parameters
| | | | | | | | | | | | | | | | | | | | |
| Parameter | | | Value | | Unit |
| Overall Open Pit Slope Angle | | 45 | degrees |
| Plant Recovery | | | 64 | | % |
| Plant Feed Rate | | 700,000 | tpa |
| NPV Discount Rate | | | 8 | | % |
| Underground Development Cost | | 1 | US$/t mined |
| Exclusion Zone | | | 20 | | m |
Table 1-8 presents the mineral resource estimate for the ST1 zone assuming a hybrid, combined open pit and underground scenario. Table 1-1 and Table 1-2 list the price and cost assumptions used to determine the base case NSR cut-off of $92.22/t for the open pit component and $141.22/t for the underground component.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 5 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Table 1-8 Hybrid Mineral Resource
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
Class | Ore Tonnes (000s) | TREO % | | Magnet Basket | |
|
|
|
|
|
|
|
| Full Basket | |
|
|
TREO % |
Pr6O11 ppm | Nd2O3 ppm | Tb4O7 ppm | Dy2O3 ppm | Eu2O3 ppm | Gd2O3 ppm | Sm2O3 ppm | Y2O3 ppm | Ce2O3 ppm | La2O3 ppm |
Indicated | 6,900 | 1.60 | 963 | 3,070 | 13.2 | 32.3 | 67.9 | 163 | 304 | 65 | 7,972 | 3,355 |
Inferred | 5,341 | 0.96 | 572 | 1,850 | 7.4 | 20.4 | 39.7 | 89 | 181 | 47 | 4,761 | 2,053 |
Total | 12,240 | 1.32 | 792 | 2,538 | 10.7 | 27.1 | 55.6 | 131 | 250 | 57 | 6,571 | 2,787 |
Notes:
1. Mineral resource estimate prepared by Ronald G. Simpson of GeoSim Services Inc. with an effective date of July 31st, 2026.
2. Mineral Resources are estimated consistent with CIM Definition Standards and reported in accordance with S-K 1300.
3. Mineral resources are not mineral reserves and do not have demonstrated economic viability.
4. Mineral resources are constrained by an optimized pit shell using the following assumptions: REO prices as listed in Table 1-1; assumed deductions of metallurgical recovery of 64%, payability of 60%, royalties of 5%, and insurance of 0.5%; open pit mining costs of US$6 per tonne; processing costs of US$69.72 per tonne; G&A of US$16.5/t and using the full basket NSR optimization.
5. The base case NSR cut-off of $92.22/t is believed to provide a reasonable margin over operating costs for the open pit mining and processing component. The base case NSR cut-off of $141.22/t is believed to provide a reasonable margin over operating costs for underground mining and processing component.
6. Totals may not sum due to rounding.
Areas of uncertainty that may materially impact the Project’s potential economic viability or continued viability include:
Commodity price assumptions
Assumptions that all required permits will be forthcoming
Metallurgical recoveries
Mining and process cost assumptions
Ability to meet and maintain permitting and environmental license conditions and the ability to maintain the social license to operate.
There are no other known material factors or issues that materially affect the Project other than normal risks faced by mining projects in Greenland in terms of environmental, permitting, taxation, socio economic, marketing, and political factors. The author is not aware of any known legal or title issues that would materially affect the Project's potential economic viability.
1.6 Interpretation and Conclusions
Geosim has prepared a Mineral Resource Estimate update for the ST-1 Zone of the Sarfartoq Rare Earths Project. The following observations and conclusions were drawn:
The ST1 Zone is associated with coarse grained ferrocarbonatite bodies composed mostly of ankerite, ferrodolomite, siderite, K feldspar, barite and pyrite. The REE are associated with hematite and ankeritic-calcitic masses containing complex aggregates of fine-grained barite, apatite, strontianite, and REE minerals including bastnäsite, synchysite, and monazite identified with various microanalytical techniques.
The adequacy of sample preparation, security and analytical procedures are sufficiently reliable to support an indicated and inferred mineral resource estimation, and that sample preparation, analysis, and security are generally performed in accordance with exploration best practices.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 6 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
The ST-1 resource estimate is based on analytical data from 94 core holes representing 23,094 m of drilling carried out between 2009 and 2023.
Statistical analysis of REO grade distribution indicates that cutting or capping of high grades is not warranted.
The SCC is mineralized across the entire extent of the complex and large areas remain to be drill tested. It is possible that there will be additional bodies discovered similar to the ST1 Zone found as exploration activities continue.
1.7 Recommendations
Based on the exploration work conducted in 2023 and on the conclusions presented above, the main recommendations are as follows:
Conduct a mineralogy study to create a three-dimensional mineralogical variation model across the ST1 resource to direct continued metallurgical test work and provide a framework for the mineralogical characterization of ST1 resource expansions and of other targets.
Continue bench scale metallurgical studies on the ST1 resource with a focus on increasing the grade and recovery of REE mineral concentrates and adapting to mineralogical variations of the system.
Continued drilling at ST1 to expand the resource and delineate higher REE grades and more favorable REE distributions.
Continued drilling between the ST1 and ST40 Zones to delineate higher grade REE mineralization there, either as a satellite resource or an extension of the ST1 resource.
Complete additional exploration drilling on other REE targets around the 32 km outer ring structure of the SCC.
Current underground mining cost parameter is conceptual and requires refinement based on an underground mining method preferred for this orebody and site conditions. It is recommended to conduct an underground mining method evaluation to refine the underground mining costs and revise both the underground mining scenario and the hybrid mining scenario.
Conduct a revised technical assessment, including updated resource estimates, metallurgical test work, cost estimates, forecasted REE prices, geotechnical stability analysis, hydrogeology, water management and a comparative assessment of open pit, underground, and combined mining development scenarios to identify the preferred development option.
Begin Prefeasibility Studies as soon as possible.
Continue Environmental Impact Assessment studies necessary to apply for an exploitation license.
Continue Social Impact Assessment studies necessary to apply for an exploitation license.
Begin Archeological Studies in conjunction with local experts.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 7 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
2.0 INTRODUCTION
2.1 Background
Tetra Tech Canada Inc. (Tetra Tech) and Geosim Services Inc. (Geosim) were retained by Greenland Mines Ltd (GRML) (the “Company” or the “Registrant’) to prepare an independent, S-K 1300 compliant technical report summary (TRS) for the Sarfartogq Rare Earths Project (the “Project”). The purpose of this TRS is to inform the ST1 Mineral Resource presented in this technical report. The mineralized Sarfartog Property (the “Property) includes a 191.29 km2 mineral exploration license (MEL 2020-32) in southwest Greenland, hosted in a large Proterozozoic carbonatite complex covering approximately 90 km2. Primary host minerals include Bastnasite, monazite, and pyrochlore bearing zones with key commodities: Nd, Pr, DY, Rb (magnet rare earth elements (REE)), plus La and Ce. Other resources in the license area include Nb, Ta, P and diamonds.
GRML is a public company listed on the NASDAQ (NSADAQ: GRML). GRML signed a definitive agreement on May 20, 2026, to acquire Neo North Star Resources Inc. (NNSR), former owner of the Sarfartoq Rare Earths Project. Closing of the acquisition is subject to customary closing conditions, including approval from the Government of Greenland under Section 69 of the Greenland Mineral Activities Act for the indirect transfer of the mineral rights licenses, as well as certain other regulatory and third-party consents.
This TRS includes an updated mineral resource estimate (MRE) and includes the results of exploration drilling on the Property that was completed in 2023. It updates previous technical reports published for the Project including Tetra Tech 2011 “Preliminary Economic Assessment on the Sarfartoq Rare Earths Element Project, Greenland” and Druecker and Simpson 2012 “Technical Report on the Sarfartog Project, West Greenland”,
2.2 Terms of Reference
Units of measurement used in this report conform to the SI (metric) system. Any currency in this report is United States dollars (US$) unless otherwise noted. All coordinates presented in this TRS are Universal Transverse Mercator (UTM) projection, unless otherwise specified. The reference grid used throughout the exploration program is WGS84 UTM 22N, unless otherwise specified. Definitions for acronyms and abbreviations are provided in Table 2.1.
Table 2-1 Acronyms and Abbreviations
| | | | | | | | | | | | | | |
Acronyms/ Abbreviations | Definition | Acronyms/ Abbreviations | Definition |
° | Degree | Mn | Manganese |
|
°C | Degrees Celsius | MRA | Mineral Resources Authority | |
ACME | ACME Analytical Laboratories | MRE | Mineral Resource Estimate |
|
Actlabs | Activation Laboratories Ltd. | Mt | Million tonnes | |
ALS | ALS Laboratories / ALS Chemex | Nb | Niobium |
|
Ank | Ankerite | Nd | Neodynium | |
As | Arsenic | NI 43-101 | National Instrument 43-101 |
|
Ba | Barium | NMR | New Millennium Resources NL | |
CA$ | Dollar (Canadian) | NNSR | Neo North Star Resources Inc. |
|
°
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 8 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
°
A
A
A
A
A
B
C
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Acronyms/ | | Definition | | Acronyms/ | | Definition | |
Abbreviations | Abbreviations | |
| Carb | | | Carbonate | | | NPV | | | Net Present Value | |
| Ce |
| Cerium | NSR |
| Net Smelter Return | |
| CF Minerals | | | CF Mineral Research Ltd. | | | OK | | | Ordinary Kriging | |
| CIM |
| Canadian Institute of Mining, Metallurgy and Petroleum | P |
| Phosphorous | |
| cm | | | Centimeter | | | PEA | | | Preliminary Economic Assessment | |
| COG |
| Cut-off Grade | ppb |
| Parts per billion | |
| CPI | | | Consumer Price Index | | | ppm | | | Parts per million | |
| CRM |
| Certified Reference Material | Pr |
| Praseodymium | |
| Cu | | | Copper | | | pXRF | | | Portable X-Ray Fluorescence | |
| DEM |
| Digital Elevation Model | Py |
| Pyrite | |
| DKK | | | Danish Krone | | | QA/QC | | | Quality Assurance / Quality Control | |
| DMS |
| Dense Media Separation | QP |
| Qualified Person | |
| Dol | | | Dolomite | | | RECO3F | | | REE-Fluorocarbonate | |
| Dy |
| Dysprosium | REE |
| Rare Earth Element | |
EAMRA | | Environmental Agency for Mineral | | REM | Rare Earth Minerals | |
Resource Activities | |
| EIA |
| Environmental Impact Assessment | REO |
| Rare Earth Element Oxides | |
EPMA | | Electron Probe Micro-Analyzer | | RL | Reflected Light | |
Analysis | |
| Er |
| Erbium | RPEEE |
| Reasonable Prospects for Eventual Economic Extraction | |
| Eu | | | Europium | | | Sb | | | Antimony | |
| Fe |
| Iron | SCC |
| Sarfartoq Carbonatite Complex | |
FeOx | Iron Oxides | SEM-EDS | | Scanning Electron Microscopy with Energy Dispersive Spectroscopy | |
| g |
| Gram | SG |
| Specific Gravity | |
| g/t | | | Grams per tonne | | | SGS | | | SGS (Laboratory Services Company) | |
| Gd |
| Gadolinium | SIA |
| Social Impact Assessment | |
GEUS | | Geological Survey of Denmark and | | S-K 1300 | | SEC Regulation S-K 1300 Mining Disclosure Standard | |
Greenland | |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 9 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| GGU |
| Geological Survey of Greenland (former Danish Geological Survey) | Sm |
| Samarium | |
| GPS | | | Global Positioning System | | | Sn | | | Tin | |
| GRML |
| Greenland Mines Ltd. | Sr |
| Strontium | |
| ha | | | Hectare (10,000 m2) | | | SRC | | | Saskatchewan Research Council | |
| HASL |
| Height Above Sea Level | Ta |
| Tantalum | |
| Acronyms/ | | Definition | | Acronyms/ | | Definition |
Abbreviations | Abbreviations |
| Hem | | | Hematite | | | Tb | | | Terbium | |
| Ho |
| Holmium | Th |
| Thorium |
|
HREE | | Heavy Rare Earth Elements (Tb to | | TLP | Plane Polarized Light |
Lu plus Y) |
| IBA |
| Impact Benefit Agreement | TLX |
| Crossed Polarized Light |
|
ICP-MS | | Inductively Coupled Plasma Mass | | Tm | Thulium |
Spectrometry |
| ICP-OES |
| Inductively Coupled Plasma Optical Emission Spectrometry | ToR |
| Terms of Reference |
|
| ID2 | | | Inverse Distance Squared | | | tpa | | | Tonnes per annum | |
| JORC |
| Joint Ore Reserves Committee | TREO |
| Total Rare Earth Elements calculated as Oxides* |
|
| k | | | Kilo (thousand) | | | TRS | | | Technical Report Summary | |
| Kfs |
| Potassium Feldspar | U |
| Uranium |
|
| kg | | | Kilogram | | | US$ | | | Dollar (American) | |
| km |
| Kilometer | UTM |
| Universal Transverse Mercator |
|
| km2 | | | Square kilometer | | | W | | | Tungsten | |
| LREE |
| Light Rare Earth Elements (La to Gd) | WGS84 |
| World Geodetic System 1984 |
|
| Lu | | | Lutetium | | | XRD | | | X-Ray Diffraction | |
| m |
| Meter | Y |
| Yttrium |
|
| M | | | Million | | | Yb | | | Ytterbium | |
| MEL |
| Mineral Exploration Licence | Zn |
| Zinc |
|
| MLSA | | | Mineral Licence and Safety Authority | | | Zr | | | Zirconium | |
| mm |
| Millimeter |
|
|
|
|
|
|
* The elements include atomic numbers 57 (lanthanum) to 71 (lutetium), plus 39 (yttrium). The REE are generally trivalent in nature and reported
as REE2O3, though tetravalent Ce commonly occurs in cerianite and divalent Eu commonly substitutes for Ca in plagioclase. Results for Ce,
Pr, and Tb are commonly reported as Ce2O3, Pr6O11, and Tb4O7. The conversion from element to oxide for the individual elements is included
below.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 10 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Table 2-2 Rare Earth Oxide and Specialty Metal Conversion Factors
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
Element | Multiplier | | Oxide | | Element | Multiplier | | Oxide Equivalent |
Equivalent |
La | | 1.173 | La2O3 | Tb | 1.176 |
| Tb4O7 |
Ce | | | 1.171 | | | Ce2O3 | | | Dy | | | 1.148 | | | Dy2O3 |
Ce | | 1.228 | CeO2 | Ho | 1.146 |
| Ho2O3 |
Pr | | | 1.170 | | | Pr2O3 | | | Er | | | 1.143 | | | Er2O3 |
Pr | | 1.208 | Pr6O11 | Tm | 1.142 |
| Tm2O3 |
Nd | | | 1.166 | | | Nd2O3 | | | Yb | | | 1.139 | | | Yb2O3 |
Sm | | 1.16 | Sm2O3 | Lu | 1.137 |
| Lu2O3 |
Eu | | | 1.158 | | | Eu2O3 | | | Y | | | 1.270 | | | Y2O3 |
Eu | | 1.105 | Eu2O3 | Nb | 1.431 |
| Nb2O5 |
Gd | | | 1.153 | | | Gd2O3 | | | Ta | | | 1.221 | | | Ta2O5 |
Tb | | 1.151 | Tb2O3 |
|
|
|
|
|
|
|
|
2.3 Sources of Information and Data
The authors have prepared this report and the information, conclusions, and opinions contained herein are based on:
Information available to the authors at the time of preparation of this report
Assumptions, conditions and qualifications as set forth in this report
Data, reports and other information supplied by GRML
Information collected during site visits
This report was prepared using published information, unpublished company reports, and data generated by Company consultants. References are included in the context of the report and a list of such references is included in Section 23. Literature sources were consulted and where used, are cited accordingly as references.
The authors have not verified the legal details of the property, title, sale and ownership agreements; instead, they have relied on information provided by GRML.
2.4 Qualified Persons and Details of Personal Inspection
Ronald G. Simpson, P.Geo (Geosim Services Inc.) is an independent Qualified Person (QP) retained by GRML and is responsible for the preparation and review of all technical content of this report, with the exception of Section 10.0 which was prepared by QP Hassan Ghaffari, P.Eng., M.A.Sc. (Tetra Tech Canada Inc.). A summary of firms contributing to the content of each section is provided in Table 2-1.
Mr. Simpon was involved in establishing the resource estimates for Tetra Tech 2011, Druecker 2012, as well as the 2023-24 drilling campaign which was led by Jason M. Felsman (Felsman) of Felsman Geologic Services LLC (FGS). Published and internal reports from these periods were reviewed by Mr. Simpson and form the basis for this 2026 MRE update. Mr. Simpson visited the Property from September 7-9, 2010.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 11 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Table 2-3 Summary of Technical Contributors
| | | | | | | | | | | | | | | | | |
| Report Section | | | Contributing Company | |
| 1.0 Executive Summary | |
| GeoSim Services/Tetra Tech |
|
| 2.0 Introduction | | | GeoSim Services | |
| 3.0 Property Description | |
| GeoSim Services |
|
| 4.0 Accessibility, Climate, Local Resources, Infrastructure, and Physiography | | | GeoSim Services | |
| 5.0 History | |
| GeoSim Services |
|
| 6.0 Geological Setting, Mineralization, and Deposit | | | GeoSim Services | |
| 7.0 Exploration | |
| GeoSim Services |
|
| 8.0 Sample Preparation, Analyses, and Security | | | GeoSim Services | |
| 9.0 Data Verification | |
| GeoSim Services |
|
| 10.0 Mineral Processing and Metallurgical Testing | | | Tetra Tech | |
| 11.0 Mineral Resource Estimates | |
| GeoSim Services/Tetra Tech |
|
| 12.0 Mineral Reserve Estimates | | | N/A | |
| 13.0 Mining Methods | |
| N/A |
|
| 14.0 Process and Recovery Methods | | | N/A | |
| 15.0 Infrastructure | |
| N/A |
|
| 16.0 Market Studies | | | N/A | |
| 17.0 Environmental Studies, Permitting, and Plans, Negotiations, or | |
|
|
|
Agreements with Local Individuals or Groups |
| Greenland Mines Ltd |
|
| 18.0 Capital and Operating Costs | | | N/A | |
| 19.0 Economic Analysis | |
| N/A |
|
| 20.0 Adjacent Properties | | | Greenland Mines Ltd | |
| 21.0 Other Relevant Data and Information | |
| Greenland Mines Ltd |
|
| 22.0 Interpretation and Conclusions | | | GeoSim Services | |
| 23.0 Recommendations | |
| GeoSim Services/Tetra Tech |
|
24.0 References | | Greenland Mines Ltd /GeoSim Services | |
/ Tetra Tech |
| 25.0 Reliance on Information Provided by the Registrant | |
| Greenland Mines Ltd /GeoSim Services |
|
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 12 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
3.0 PROPERTY DESCRIPTION
3.1 Project Location
The Sarfartoq Project lies in the Qeqqata municipality of southern West Greenland within the Sarfartoq Carbonatite Complex. The Project is located approximately 60 kilometers southwest of the Kangerlussuaq airport (Figure 3-1), one of Greenland’s three international airports, and 140 km northeast of the village of Maniitsog, and 110 km southeast of the town of Sisimiut.
The Sarfartoq Project mineral exploration license (MEL 2020-32) is centered on the 130 km2 Sarfartoq Carbonatite Complex, which is located at approximately 66.52° N and 51.35°W UTM Zone 22 ((WGS 84) latitude 66°30’N (the Arctic Circle) and longitude 51°15’W).
The Nd-Pr REE mineralized ST1 zone that is the in focus for this report is one of several mineralized targets - e.g. with ST19, ST24, ST31 and ST40 - on the outer-ring structure of the Sarfartoq Carbonatite Complex. ST1 represents the most studied and developed target with historical mineral resource estimates.
Access to the Project is possible by boat to the Angujaartorfik Inlet (Robinson Bay) on Kangerlussuaq (Søndre Strømfjord), or by a 20-minute helicopter flight from Kangerlussuaq airport. Søndre Strømfjord is a large deep-water sheltered fjord and is navigable by large vessels from the coast up to its terminus at the Kangerlussuaq airport. The coast is usually ice-free for most of the year.
3.2 Mineral Rights
In Greenland, a mineral exploration license (MEL) covers exploration for all mineral resources except hydrocarbons and radioactive elements, unless otherwise indicated in the license. Under the Greenland Mineral Resources Act an exploration license is exclusive, is granted for an initial five-year period (renewable in further periods), and carries minimum annual exploration-expenditure and area-based fee obligations; it confers the exclusive right to explore but not the right to mine, which requires a separate exploitation license. The Terms of Reference required to convert the exploration license to an exploitation license have not yet been prepared, and the tenure remains at exploration-license stage.
Hudson Resources Ltd. (‘Hudson’) was granted the Sarfartoq MEL 2020-32 1%t of March 2020. On the 9th of May 2023, the license MEL 2020-32 was transferred from Hudson Resources Inc. to the Greenland registered company Qaasuitsup Ulloriaa (the Greenland branch of Neo North Star Resources Inc. ((NSSR’)). A license expansion to include a proposed access route and harbor was approved on 13th of June 2024, increasing the area covered to 191.29 km2.
The license is active, with an expiry date of 30th December 2026. This is the only license held by NNSR and covers the known extent of the SCC, except for the Arnangarnup Qoorura (also known as ‘Paradis Valley’) protected area. A detailed tenure history covering Hudson’s various licenses can be found in Druecker & Simpson (2012).
On 20th of May 2026, GRML entered into a definitive agreement with Neo North Star Holdings Inc. (a wholly owned subsidiary of Neo Performance Materials Inc. (TSX: NEO)) and the other stockholders of NNSR to acquire 100% of NNSR - and, indirectly through NNSR, its Greenland branch-company named Qaasuitsup Ulloriaa which is the registered holder of MEL 2020-32 covering the Sarfartoq Project. The memorandum of understanding under which the parties hold the right to negotiate a definitive offtake agreement for up to 60% of the concentrate produced from the Project is unaffected by the transaction and remains in place.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 13 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Figure 3-1 Location of Sarfartoq Rare Earths Project, Greenland
Closing of the acquisition is subject to customary closing conditions, including approval from the Government of Greenland (in Greenlandic “Naalakkersuisut’), under Section 69 of the Greenland Mineral Resources Act (Inatsisartut Act No. 7 of 7 December 2009, as amended), for the indirect transfer of the mineral rights license, together with other regulatory and third-party consents.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 14 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
The formal application for transfer of MEL 2020-32 has been submitted 29th of May 2026 by GRML to the Government of Greenland and the transfer process has been initiated. The Government of Greenland previously approved an equivalent Section 69 transfer of MEL 2020-32 from Hudson Resources Inc. to Qaasuitsup Ulloriaa (NNSR) on the 9th of May 2023, providing a direct and recent precedent for the transfer now under consideration.
This TRS is issued on the basis that Government of Greenland approval of the transfer will have been received on or before the effective date of the report, at which point GRML, through its at that time wholly owned subsidiary Qaasuitsup Ulloriaa, will hold 100% of the mineral rights to the Project under MEL 2020-32. The QP has relied on the Registrant for the status of the transfer application for the Project (see Section 22.0).
3.2.1 Mineral Claims, Licenses, and Leases
The Sarfartoq Rare Earths Project is held under mineral exploration license MEL 2020-32. Table 3-1 and Table 3-2 summarize the MEL and the coordinates for the area covered by the MEL. The extent of MEL 2020-32 is shown in Figure 3-2.
Table 3-1 Mineral Tenure Summary
| | | | | | | | | | | |
| Mineral Tenure Summary |
| Item | | Detail |
| License | | Mineral exploration license MEL 2020-32 (application M-MLSA-254) |
| License type | | Exploration (exclusive) - not an exploitation/mining license |
| Registered holder | | Qaatsuitsup Ulloriaa (Greenland branch of Neo North Star Resources, Inc.) |
1 h | 91.29 km² (following the 13 June 2024 expansion to include a proposed access route and |
arbour) |
Grant / Transfer / Expiry | #VALUE! |
| Assets listed | | Rare earth elements, niobium, tantalum, cadmium |
Governing law | Greenland Mineral Resources Act (Act No. 7 of 7 December 2009, as amended) |
Protected area c | Excludes (Not part or the 191.zykm*) tne Arnangarnup Woorua protected area (=Yo km‘), wnicn covers part of the complex including the carbonatite core |
Source: Mineral License and Safety Authority Greenland, Online Applications Portal (accessed 2026/07/23)
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 15 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Table 3-2 Coordinates for MEL 2020-32
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Mineral Exploration License 2020-32 Coordinates | |
| Beacon | | | Long/Lat | | | Beacon | | | Long/Lat | |
| A1 | |
| N 66, 34, 0 W 51, 19, 0 |
| | B1 | |
| N 66, 34, 0 W 51, 19, 0 |
|
| A2 | |
| N 66, 34, 0 W 51, 9, 0 |
| | B2 | |
| N 66, 36, 0 W 51, 19, 0 |
|
| A3 | |
| N 66, 33, 0 W 51, 9, 0 |
| | B3 | |
| N 66, 36, 0 W 51, 22, 0 |
|
| A4 | |
| N 66, 33, 0 W 51, 7, 0 |
| | B4 | |
| N 66, 40, 0 W 51, 22, 0 |
|
| A5 | |
| N 66, 32, 0 W 51, 7, 0 |
| | B5 | |
| N 66, 40, 0 W 51, 24, 0 |
|
| A6 | |
| N 66, 30, 0 W 51, 7, 0 |
| | B6 | |
| N 66, 41, 30 W 51, 24, 0 |
|
| A7 | |
| N 66, 30, 0 W 51, 8, 0 |
| | B7 | |
| N 66, 41, 30 W 51, 34, 0 |
|
| A8 | |
| N 66, 29, 0 W 51, 8, 0 |
| | B8 | |
| N 66, 42, 45 W 51, 34, 0 |
|
| A9 | |
| N 66, 29, 0 W 51, 9, 0 |
| | B9 | |
| N 66, 42, 45 W 51, 24, 0 |
|
| A10 | |
| N 66, 28, 0 W 51, 9, 0 |
| | B10 | |
| N 66, 42, 0 W 51, 24, 0 |
|
| A11 | |
| N 66, 28, 0 W 51, 11, 0 |
| | B11 | |
| N 66, 42, 0 W 51, 18, 0 |
|
| A12 | |
| N 66, 26, 0 W 51, 11, 0 |
| | B12 | |
| N 66, 38, 30 W 51, 18, 0 |
|
| A13 | |
| N 66, 26, 0 W 51, 20, 0 |
| | B13 | |
| N 66, 38, 30 W 51, 15, 0 |
|
| A14 | |
| N 66, 27, 0 W 51, 20, 0 |
| | B14 | |
| N 66, 37, 0 W 51, 15, 0 |
|
| A15 | |
| N 66, 32, 0 W 51, 7, 0 |
| | B15 | |
| N 66, 37, 0 W 51, 9, 0 |
|
| A16 | |
| N 66, 31, 0 W 51, 22, 0 |
| | B16 | |
| N 66, 34, 0 W 51, 9, 0 |
|
| A17 | |
| N 66, 33, 0 W 51, 22, 0 |
| | | |
|
|
|
| A18 | |
| N 66, 33, 0 W 51, 19, 0 |
| | | |
|
|
|
Note: A1 to A18 is the Southern Part of the MEL that was Granted 1st of March 2020, B1 to B16 is the Northern Expansion of the MEL 2020-
32 that was Granted 13th of June, 2024.
Source: Mineral License and Safety Authority Greenland, Online Applications Portal (accessed 2026/07/23)
3.2.2 Surface Rights and Leases
In accordance with the Greenland law, there is no ownership of surface rights. GRML has the right to explore under MEL 2020-32 with the option of a rollover into exploitation.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 16 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Figure 3-2 MEL 2020-32 in blue and the Arnangarnup Qoorua protected area in red
Source: Mineral License and Safety Authority Greenland, Online Applications Portal (accessed 2026/07/23).
3.3 Property Encumbrances
The Project is at the exploration-license stage. Under the Standard Terms, geological and geochemical work, handheld-equipment sampling (within specified weight limits) and non-explosive geophysical surveys may be carried out without specific approval, whereas core drilling, use of explosives or radioactive sources, use of vehicles and any terrain works require pre-approval from the authorities.
The Arnangarnup Qoorua protected area (96 km?), which covers part of the complex including the carbonatite core, carries additional access restrictions (for example minimum aircraft altitudes and prohibitions on ground traffic, fires and collection of vegetation or antiquities), and the carbonatite core is presently not accessible for field work.
An exploitation license has not been applied for; environmental baseline work is ongoing, with a further year of baseline studies intended ahead of submission. No material environmental liabilities from prior activity are known.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 17 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
In Greenland, a first mineral exploration license period is between 1 and 5 years. At expiration the licensee is entitled to be granted a new 5-year license for the same area and mineral resources, provided the Mineral Resources Authority has received an application for this no later than December 31, in year 5. The new license period will count as years 6 through 10. At expiration of the second license period, the licensee may be granted new 3-year licenses for the same area and mineral resources.
There is a fixed fee to be paid at the granting of the license at each period (DKK 25,000 adj to 38,600). During years 6-10 there is an annual fee per license (DKK 25,000) which is indexed to the Danish CPI.
The licensee is obligated to spend exploration expenses per calendar year (adjusted for inflation) as follows:
Years 1-2: DKK 100,000 (adj to 177,000)
Years 3-5: DKK 200,000 (adj to 353,000)
Years 6-10: DKK 400,000
An amount per km2 per calendar year as follows:
Years 1-2: DKK 1,000 (adj to 1,770) per km2
Years 3-5: DKK 5,000 (adj to 8,840) per km2
Years 6-10: DKK 10,000 per km2
The license Period, fees and obligations are available on the Mineral Resources Authority website: govmin.gl
Mineral activities are governed by the Mineral Resources Act (Act No. 7 of 7 December 2009, in force 1 January 2010, as amended). All minerals belong to the Government of Greenland (Naalakkersuisut), which grants licenses; there is no private land, and there is no ownership of surface rights. The Mineral License and Safety Authority (MLSA) administers licensing and safety, and the Environmental Agency for Mineral Resource Activities (EAMRA) administers environmental matters. Exploration is conducted under the Standard Terms for Exploration Licenses for Minerals (Excluding Hydrocarbons).
The right to mine requires an exploitation license, typically granted for 30 years, containing terms for royalty, the exploitation and closure plans, reporting, and an Impact Benefit Agreement between the company, the municipality and the Government. The path requires an Environmental Impact Assessment (EIA) and a Social Impact Assessment (SIA), each preceded by baseline studies (commonly two, can be extended to three years) and public consultation: Terms of Reference are published for public hearing; a draft EIA/SIA is published for consultation; the licensee addresses comments in a White Paper; and, following approval, a Mine Plan, Closure Plan and financial security are required before mining may commence. Recent exploitation-license grants (Greenland Resources molybdenum, June 2025; Amaroq/Greenland Graphite, December 2025) indicate a functioning current permitting process.
Greenland's Uranium Act (Inatsisartut Act No. 20 of 1 December 2021) prohibits the exploitation of uranium and of any mineral resource containing more than 100 ppm uranium and authorises the Government to introduce similar restrictions on other radioactive elements. The available Sarfartoq composite head assays indicate uranium of the order of 5 ppm - well below the 100 ppm threshold - which is favourable for permitting. Thorium is, however, present as naturally occurring radioactive material, and the Government retains standing authority to extend radioactive-element restrictions. The sub-threshold uranium status should be confirmed across the Mineral Resource, not only the test composites.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 18 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
3.4 Royalties or Similar Interests
The principal commercial agreement affecting the property is an offtake arrangement: under a memorandum of understanding between Neo and NNSR, Neo holds the right to negotiate a definitive offtake agreement for up to 60% of the concentrate produced; this is reflected in the marketing and payability assumptions and is unaffected by the GRML acquisition. No other royalties, back-in rights, production streams or material encumbrances are known.
Mineral production in Greenland is subject to a royalty payable to the Government of Greenland. Under section 1408.d of, and Appendix 2 to addendum no. 3 of 1 July 2014 to, the Standard Terms for Exploration Licences for Minerals (Excluding Hydrocarbons) in Greenland, a licensee exploiting rare earth elements pays a sales royalty of 5% of the value of the minerals sold, against which corporate income tax and corporate dividend withholding tax actually paid may be offset.
The royalty rate is 5% for uranium, 2.5% for minerals other than rare earth elements, uranium and gemstones, and 5.5% for gemstones. A surplus royalty of 15% on profit above a 40% margin applies to gemstones only and does not apply to rare earth elements.
A royalty of 5% has been applied as a deduction in the net smelter return calculations used to constrain the Mineral Resource estimate reported herein.
The property is currently held under an exploration licence. The royalty and other fiscal terms applicable to production will be determined in the exploitation licence granted under the Mineral Resources Act and are not yet contractually fixed.
Taxation of income arising from the Project is addressed in the economic analysis prepared separately for the Project and is not a determinant of the Mineral Resource estimate reported herein.
4.1 Topography and Elevation
The topography of the area is rugged with elevation ranging from 1,200 m at the Garnet Lake site, just east of the local icecap Kangaamiut Sermiat (formerly known as Sukkertoppen Iskappe) which is located 25 km south-west of Sarfartoq, to sea level in the Sarfartoq Valley and Søndre Strømfjord. The current base of operations for the Project is known as Sarfartog Camp (formerly known as ‘Neo Camp’), which is located at about 730 m elevation with ready access northwards to the fjord.
The license area is characterized by steeply incised streams and creeks and broad glacial valleys with higher plateau areas above. Intermittent streams are numerous. The area underlain by the core of the Sarfartoq Carbonatite Complex is less rugged and may be more vegetated due to the presence of phosphates present in the carbonatite.
The area is host to subarctic vegetation, with till-covered areas blanketed by grasses and ground shrubs (Labrador tea, dwarf willow and birch) and flowering plants. Wildlife is plentiful, and includes caribou (reindeer), muskox, arctic hare, arctic fox, ptarmigan and other land and sea birds. The greatest concentrations of wildlife occur in the Sarfartoq Valley, outside of the exploration license boundaries.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 19 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
4.2 Accessibility
The property is allocated approximately 60 km southwest of the Kangerlussuaq. Historically, Kangerlussuaq Airport, which has a long, all-weather paved runway built as the United States Sondrestrom Air Base and chosen for its stable weather, was Greenland's most important international transportation hub, offering regular flights from Copenhagen and numerous settlements in Greenland. Recently, international air service was transferred to the capital city of Nuuk, but the airport at Kangelussuaq remains in service. Several new, international routes to Nuuk are being added. However, Kangerlussuaq Airport remains to be services regular from Copenhagen and is also a major hub for the Danish Military and associated military surveillance, rescue services and flights.
The Arctic Basic Training (in Danish: Arktisk Basisuddannelse) under the Danish Military is based in Kangerlussuaq, Greenland, utilizing the military facilities adjacent to Kangerlussuaq Airport. The Arctic Basic Training is administered by the Danish Ministry of Defence through Arctic Command, but it was developed in close cooperation with the Government of Greenland. It is intended primarily for young people residing in Greenland and is designed to strengthen Greenland's emergency preparedness, resilience, and local recruitment into military and civilian emergency services. While the airport itself is not the training site, its infrastructure supports accommodation, logistics, and access to the surrounding Arctic terrain, where recruits receive military and emergency-response training under realistic Arctic conditions.
Helicopter is the preferred means of transportation for field activities; however, during the summer months (May to September), the property can be accessed by boat, from Søndre Strømfjord. Small boats can be rented in Kangerlussuaq; however, a larger craft and crew (if needed) must be chartered from larger centres, such as Nuuk. The fjord is typically ice free from March through November, but this varies from year to year.
There is no road network connecting the communities, although a road of about 170 km between Kangerlussuaq and Sisimiut has been discussed. The coastal town of Sisimiut, a port and the home of Greenland's mining school, lies about 130 km to the north-west, and Kangerlussuaq lies near the head of the Søndre Strømfjord, which provides deep-water sealift access from the coast.
Access to the Sarfartoq Project is possible by boat and larger vessels/barges to the Angujaartorfik Inlet (Robinson Bay) on the southern side of the central part of Kangerlussuaq fjord (Søndre Strømfjord). Søndre Strømfjord is a large deep-water sheltered fjord and is navigable by large vessels from the coast up to its terminus at the Kangerlussuaq airport. The coast is usually ice-free for most of the year.
When the terrain and fjord are covered with snow and ice, the Property is accessible via snowmobile. Driving in the terrain is not allowed without a permit.
There are no roads between Kangerlussuaq and other communities, but there have been discussions about building a 170 km long road to Sisimiut.
4.3 Climate
The climate is strongly continental subarctic, and Kangerlussuaq - the nearest settlement and the regional reference station - is one of the driest inhabited parts of Greenland. Temperature varies from -35° C to 20° C, with a mean annual temperature of approximately -5.4° C. Precipitation is sparse throughout the year (of the order of 170 290 mm per year). The area is usually ice and snow free from June through September. Winters are characterized by cold conditions (February mean = -17 to —20° C, with cold spells below -35° C most years) and summers short but relatively mild, with July daytime maxima of about 14 16° C.
As the Property is located on the Arctic Circle there are certain limitations for various activities. Exploration techniques such as prospecting, heavy mineral sampling and geological studies are limited to the summer months
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 20 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
(May to September) when the snow cover is mostly melted. Activities such as ground or airborne geophysics and drilling can be conducted over a much greater period during the year (March to October), being limited only by the practicalities of working in the low temperatures and light levels of the mid-winter (December February) months. Radiometric surveys must be completed when the ground is completely snow and ice free, typically July to mid- September.
4.4 Local Resources and Infrastructure
Kangerlussuaq provides airport, fuel, accommodation and logistics services and is the natural staging point for the Project; diesel, Jet-A1 and gasoline are available there, while propane is typically shipped from Nuuk. Sisimiut, the second-largest town in Greenland and the seat of the Arctic mining school, is a source of trained mining and trades personnel and of port services. The operation is expected to be supported on a fly-in / fly-out basis through Kangerlussuaq, with local hiring and training obligations addressed through the Impact Benefit Agreement under any exploitation license
Power for operations in the field must be generated locally. Drilling and camp operations are generally powered by diesel generators, with supplemental use of small gasoline generators and solar panels. Transportation in the field is via helicopter, using Jet-A1 fuel. Diesel and gas powered vehicles may be used with the proper permits. Propane is used as heating and cooking fuel. Fuel stored in the field is transported via helicopter and/or barge in propane tanks, 200 liter drums, or 1,000 liter cubes. Diesel, Jet-A1, and gasoline are available in Kangerlussuaq, and propane is typically shipped from Nuuk.
A hybrid renewable (hydro-diesel) power configuration, taking advantage of the region's hydropower resources, is identified as a potential opportunity moving forward that could reduce operating cost and emissions. The Kangerlussuaq region is recognized for its substantial hydropower potential, supported by abundant glacial meltwater and favorable topography. Several of Greenland's largest identified hydropower resources are located between Kangerlussuaq and Nuuk, making the region a strategic focus for future renewable energy. Several studies have been conducted on this. The Government of Greenland has initiated a competitive tender process for two major hydropower resources, Tasersiaq and Tarsartuup Tasersua, located between Kangerlussuaq and Nuuk.
Process and potable water are expected to be readily available from local lakes, rivers and glacial meltwater, subject to seasonal flow and freezing.
The Project already holds material field infrastructure for supporting exploration and development activities - an established camp for approximately 25 30 personnel and two diamond drill rigs in good condition with field-support facilities, which GRML intends to re-open in 2026. Concentrate export would route through a marine facility, either by sealift from the head of the Søndre Strømfjord near Kangerlussuaq or via a coastal port such as Sisimiut.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 21 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Table 4-1 Overview of Population Centres and Local Available Potential Workforce in the Sarfartoq/Kangerlussuaq Region
| | | | | | | | | | | | | | | | | | | | | | | | | | |
Population Centre | Population | | Distance | | Transport Connection | | Workforce Potential and Relevant | |
Sarfartoq | Skills |
Kangerlussuaq (town) | ~400 450 | ~60 km east | Kangerlussuaq International Airport; large boat/vessel access (deep harbour); local roads/tracks; helicopter/charter access |
| Nearest workforce base. Aviation, logistics, construction support, mechanics, tourism operators, accommodation, catering, field operations, Arctic survival skills. Limited population capacity for large projects. |
|
Sisimiut (town) | ~5,500 | ~150 km west | Domestic airport; large boat/vessel access harbour; regional transport hub | | Most important nearby labour pool. | |
Skilled trades, construction workers, |
electricians, mechanics, maritime |
workers, operators, administration, |
apprentices, vocational graduates. |
Regional hospital and education |
facilities support larger projects. |
Maniitsoq (town) | ~2,500 | ~200 km southwest | Heliport; harbour; coastal shipping |
| Additional workforce pool with maritime, fishing, construction, mechanical, and operational experience. |
|
Nuuk (town) | ~20,000 | ~300 km south | Nuuk International Airport; major harbour large boat/vessel access (deep harbour); national services | | Largest Greenlandic professional | |
workforce. Engineers, project |
managers, consultants, |
administration, government |
interfaces, contractors, technical |
specialists. |
4.5 Seismicity
There is no significant seismic activity recorded in this region.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 22 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
5.0 HISTORY
The Sarfartoq region has been the focus of several sustained exploration programs since the 1970s. Early-stage generative diamond exploration was conducted by subsidiaries of De Beers and Rio Tinto, in the early 1970s.
In the 1980s, work was conducted on the carbonatite looking for niobium and tantalum. Following the discovery of diamond deposits in the Canadian arctic, the 1990s saw sustained generative campaigns for diamond exploration at Sarfartoq.
5.1 Rare Earth and Specialty Metals Exploration
The Sarfartoq Carbonatite Complex (SCC) was discovered by GGU (Danish Geological Survey, now GEUS Geological Survey of Denmark and Greenland) geologists after a field investigation following a regional airborne radiometric survey conducted in 1976 (Secher, 1976).
Between 1976 and 1981, mapping by Secher & Larsen (GGU) combined with airborne geomagnetic and ground magnetometer surveys provided a geologic map of the complex and detailed information in reference to the petrology, mineralogy and petrogenesis of the complex (Secher, 1986; Secher and Larsen, 1981). In 2009, A. Bedini concluded that a lithological map of the different carbonatite types and alterations can be obtained using a Hymap imaging spectrometer data. He also confirmed the ferrocarbonate nature of the core and the hematite alteration in what he refers to as the marginal zone that surrounds the SCC.
In 1976, Secher inferred a potential resource for large phosphorous, niobium, and REE deposits. He estimated that the phosphorous content was limited to the inner core of the complex, a magnetite-apatite bearing ferrocarbonatite. Niobium mineralization recognized as pyrochlore accumulations is present within the marginal zone of the core of the SCC and associated with uranium bearing faults and fractures. Sarfartoq No. 1 is the main locality of potential economic Nb mineralization.
In 1989, Hecla Mining Company undertook a diamond drilling program consisting of 13 holes totaling 567.51 m in the Sarfartoq No.1 niobium occurrence. Druecker (1989) calculated a non-compliant resource estimate of 25,000 to 30,000 tonnes at a cut-off grade of 10% Nb2O5; and he interpreted that the pyrochlore zone pinched out laterally at both ends of the shear zone. Hecla surrendered the license at the end of 1989. Texas Energy Corporation NL (TEC) and Foundation Resources were granted a license (MEL25/96) in 1996 and conducted geological and metallurgical investigations on the Sarfartoq No.1 Niobium occurrence in 1997.
In 1998, TEC and Foundation Resources signed an exclusive rights agreement with New Millenium Resources NL (NMR). NMR then drilled 15 NQ diamond drill holes totaling 707 m at Sarfartoq No. 1 and took channel samples over the deposit. Maynard (1999) provides an independent non-compliant resource estimate of 35,000 tonnes at 7.9% Nb (11.3% Nb2O5) using a cut-off grade of 5% Nb to a vertical depth of 45 m in the measured category. The resource estimate has an indicated non-compliant resource estimate of 186,000 tonnes at 3.2% Nb (4.6% Nb2O5). In 1999, NMR conducted a Landsat 7 interpretation of the complex.
In 2000, NMR contracted Tesla to fly a low-level high-resolution heli-aeromagnetic and radiometric survey over the entire Sarfartoq license. Southern Geoscience interpreted the results. The radiometric anomalies were followed up in the 2000 and 2001 field seasons. The license was transferred to NMR in 2000.
In 2001, Snowden Mining Industry Consultants prepared an independent technical audit of the Sarfartoq No. 1 Resource. They concluded that there was not enough information to permit a Measured Resource status under the JORC code. Maynard in 2001 revised the resource estimate as follows: 35,000 tonnes at a grade of 7.8% Nb, an Indicated Resource of 100,000 tonnes at a grade of 3.2% Nb and up to 300,000 tonnes or more at a grade of 3.2% Nb within the existing strike length. This resource estimate is not compliant with NI43-101 or JORC.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 23 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
NMR completed an in-house resource estimate in 2002 that conformed to JORC Standard as follows: Measured Resource of 23,478 tonnes with 5.95% Nb (8.51% Nb2O5) using a lower cut-off grade of 3.0% Nb to a vertical depth of 75 m and an Inferred Resource of 64,301 tonnes at 3.89% Nb (5.56% Nb2O5) using a cut-off grade of 1.0% Nb to a vertical depth of 90 m (taken from Woodbury, 2003).
The reader is cautioned that these resource estimates are not compliant with JORC or NI 43-101 standards. A qualified person has not done sufficient work to classify the historical estimate as current mineral resources or mineral reserves. Nor is the issuer treating the historical estimate as current mineral resources or mineral reserves as defined in sections 1.2 and 1.3 of NI 43-101. Finally, the historical estimates should not be relied upon.
NMR also focused on identifying new, high-grade pyrochlore occurrences in the license. The U-Th radiometric anomalies were ranked, named, prospected and sampled on a regional scale. Stream sediment sampling was conducted on the margins of the Sarfartoq license, but no significant Nb or Ta anomalies were identified outside of the carbonatite complex.
In 2003, Hudson entered a joint-venture agreement with NMR to explore for diamonds on the Sarfartoq license. In 2006, Hudson acquired the right to 100% of all metals and diamonds on the license.
Work by Hudson on the SCC began in 2009 with encouraging results and that success continued through 2012. Hudson conducted diamond core drilling, rock chip sampling, ground geophysical surveys, petrographic analysis, and bench scale metallurgical test work. Hudson’s efforts culminated in a Preliminary Economic Assessment (PEA) on the ST1 Resource in late 2011. The PEA included an inferred mineral resource estimate of 14.1 Mt averaging 1.51% TREO and a cut-off grade of 0.8% TREO. The PEA also included a potentially positive economic analysis and recommendation to proceed to a prefeasibility study (Broad, 2011). Neither the PEA nor 2011 technical report on the property were updated after the 2012 drill program.
In 2023, Hudson transferred the Sarfartoq mineral exploration license MEL 2020-32 to Qaatsuitsup Ulloriaa (NNSR). Metallurgical testing resumed, utilizing material left from the previous Hudson program. Drill core from 2011 was sent to SGS Lakefield, Ontario for further testing. Exploration activities resumed in 2023 and continued in 2024. This included geologic mapping and sampling, soil geochemical surveys, and ground geophysical surveys. An infill drill program was conducted in 2023 to upgrade the 2011 resource estimate. NSSR did an internal (non-NI 43-101- compliant) technical update; project re-focused on neodymium praseodymium; updated ST1 resource in 2025. The non-NI 43-101-compliant internal resource estimates in the 2025 report (Felsman, Simpson, Goode and Druecker for NNSR; effective 4 April 2025) for ST1 resulted in Indicated 6.6 Mt @ 1.64%, Inferred 3.6 Mt @ 1.11%; underground: Indicated 7.2 Mt @ 1.68%, Inferred 2.5 Mt @ 1.53% TREO.
The results of 2012 and 2023 drilling are validated and included in the current mineral resource estimate in this report which is in accordance with S-K 1300 standards. The full project database now comprises 161 drill holes for 35,843 m, of which 94 holes (23,094 m) inform this ST1 Mineral Resource estimate
5.2 Diamond Exploration
The Sarfartog region has been the subject of significant diamond exploration in the past. In certain areas, Hudson’s exploration licenses overlap areas previously held by Platinova A/S, Monopros Ltd. (Monopros), Dia Met Minerals Ltd. (DiaMet), Aber Resources Ltd (Aber), and Metalex Ventures Ltd.
Exploration Licenses 29-96 and 03-98 were part of a property package held in a joint venture between Platinova A/S and Aber. Aber was the operator of the joint venture and later relinquished the ground at the end of 2000.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 24 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Much of the ground covered by these licenses was subsequently acquired by NMR for niobium and tantalum exploration.
Exploration Licenses 38-96 was part of a property package held in joint venture by Monopros, Dia Met and Citation Resources Inc. (Citation). Monopros was the operator of the joint venture, which included several other exploration licenses throughout west Greenland. At the end of 1999, Monopros relinquished its interest in MEL 38-96 to DiaMet and Citation. Exploration License 38-96 was later dropped by DiaMet and Citation.
Licenses MEL 17-97 and MEL 18-97 were both included in a separate property package held in joint venture by DiaMet, Cantex Mine Development Ltd. (Cantex) and Citation. DiaMet was operator of the joint venture that also included several other exploration licenses. In early 2001, control of DiaMet was acquired by a wholly owned subsidiary of BHP-Billiton Diamonds Inc (BHP); hence, DiaMet’s interests in both joint ventures were taken over by BHP. These MEL’s were later dropped by the joint venture. The main license area was then picked up by Metalax Ventures and represented the same personnel involved with the DiaMet venture (Chuck Fipke, et al).
Exploration license number a0455 was formerly two licenses, namely 2004/03 & 2005/08 held by Cantex Mine Development Corp. These licenses were dropped between 16th September 2006 and 16th January 2007.
Exploration conducted by DiaMet and other companies such as Monopros and Aber/Platinova was restricted to heavy mineral sampling and prospecting conducted over one or two field seasons. Results from prior heavy mineral sampling programs demonstrated that kimberlite indicator minerals with excellent diamond inclusion chemistry are present. Abundant kimberlite indicator minerals were identified by DiaMet throughout the license based upon the results of heavy mineral sampling program during 1997 and 1998 (Counts, 1999, 2002). DiaMet Indicator mineral processing was completed at CF Mineral Research Ltd. (CF Minerals) of Kelowna, B.C.
Numerous kimberlite occurrences in outcrop and float are found in the area and yield large numbers of pyrope garnets and kimberlitic picroilmenites. Three important points can be gleaned from this distribution of indicator minerals: First, the full suite of indicator minerals appear in samples that are associated abundant kimberlite bodies; and that the prospective samples and kimberlites are within 60 km north and east of the Sukkertoppen ice cap. Second, the mineral assemblage seen in the areas further east and north lack significant amounts of pyrope garnet and kimberlitic picroilmenite, indicative of related alkaline to ultramafic intrusions that are not kimberlitic. Third, the lack of a true kimberlite and associated mantle mineral assemblage in surface samples collected between the property and the main continental icecap is strong evidence that the indicator minerals recovered from the property are derived from local kimberlites or kimberlite that lies beneath the Sukkertoppen Ice cap, not from beneath the main continental ice cap.
Microprobe analysis of the pyrope garnets by CF Minerals demonstrated that many grains recovered by DiaMet on the property were most likely formed under the same temperatures and pressures at which diamond is stable. This indicates that kimberlites in the area have the potential to contain diamonds. Microprobe results from pyrope garnets recovered by DiaMet compare favorably with the chemistry of pyrope garnets found as inclusions in diamonds. They also compare favorably to pyrope garnets from the Lac de Gras kimberlite field in the Northwest Territories of Canada, where economic quantities of gem quality diamonds occur (Counts, 2002). Many pyrope garnets identified in the heavy mineral samples from the property by DiaMet are “G-10” Garnets, which are derived from a depleted mantle source that is prospective for diamonds.
In each successive year since 2003, Hudson recovered ever larger diamonds from its exploration programs. The largest stones recovered in Greenland all emanated from the Hudson licenses. Hudson completed a large amount of geophysical surveys (airborne mag and EM, seismic and ground geophysics), a significant drill program, extensive reconnaissance and significant bulk sampling programs.
Hudson was successful in identifying numerous occurrences of diamondiferous kimberlite. The majority of individual surface locations can be classified as glacial float with a likelihood of a nearby in-situ source. Drilling revealed in-situ kimberlite in almost all drill holes. The body of principal focus is a kimberlite dike dipping at
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 25 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
approximately 20° to the east with a strike of 160° to grid north, at a locality called Garnet Lake within the Sarfartoq claim block. This body, which is called the Garnet Lake Dike, averages 2.5 four m in thickness and has been tested by drilling approximately 1.4 km along strike and 900 m down slope (to a depth of 330 m) and by seismic reflection to approximately 2,160 m down slope (to a depth of 646 m).
Hudson collected kimberlite samples from the Garnet Lake Dike of 47 (2006), 160 (2007) and 499 (2008) dry tonnes from two locations where the dike is exposed in sub crop. The samples were extracted by drilling, blasting and excavating down to a maximum depth of approximately five m.
The 47 tonne sample was processed by dense media separation (DMS) followed by x-ray and grease table processing at SGS Facilities in Lakefield Ontario. The sample generated a total of 383 diamonds, weighing 12.07 carats, including a single 2.392 carat stone.
The 160 and 499 tonne samples were processed on-site in Greenland, utilizing Hudson’s DMS plant, with final liberation and diamond picking occurring at SRC Facilities in Saskatoon, Saskatchewan. The much coarser crushed 160 tonne sample generated 252 diamonds, weighing 15.47 carats. This included a 2.51 gem quality diamond valued at $600/ct and a broken very high quality diamond that likely weighed 3.5 to 4 carats. That stone had a potential unbroken stone value of $5,000/ct.
The 2008 bulk sample program processed 499 dry tonnes of kimberlite through the Company’s on-site DMS plant and yielded 78.26 carats. There were 23 diamonds in the 0.25 to 1.0 carat range, including an exceptional 0.95 carat amber colored diamond. A high proportion of the diamonds recovered were high quality, inclusion free stones.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 26 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
6.0 GEOLOGICAL SETTING, MINERALIZATION, AND DEPOSIT
6.1 Regional Geology
The SCC was first described by Secher (1976, 1986, Secher and Larsen 1980). This intrusion is interpreted to straddle the boundary between the Archean craton and the Paleoproterozoic aged Nagssugtoqidian mobile belt (Figure 6-1). The host rocks are granite and granodiorite gneisses cut by a swarm of Paleoproterozoic diabase dikes called the Kangamiut dike swarm. Age determinations indicate an age of 565Ma for emplacement of the SCC (Secher and Larsen 1980).
Figure 6-1 Regional Geology
The SCC is sub-circular to oval in shape and has an influence up to 12 km from the core (Figure 6-2). It has a conical structure with a magnetic core (Figure 6-3) consisting of apatite and magnetite rich ferrocarbonatites. The core is surrounded by narrow close-lying concentric carbonatite sheets with interleaved screens of fenitized/altered country rock, and with a partial rim of sodic fenite. The dominant carbonatite type is ferrocarbonatite with rauhaugite (ankerite dominant) in the core and beforsite (ferrodolomite dominant) in the marginal dikes. Calciocarbonatite (sovite, calcite rich) only occurs as subordinate units in the core. The most common alteration encountered is light-grey and aegirine bearing fenite (Secher, 1986).
During their field investigation, NMR also identified serpentinites, hornblendite, pyroxenites and kimberlite in the magnetic core of the complex (Barnes, 2000). It is likely that the composition and zonation of the SCC is more complex than that described by Secher and colleagues in 1976, 1986 and 1980.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 27 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Figure 6-2 Geology of the Sarfartoq Carbonatite Complex, from Secher et al. (1986)
The carbonatites in the marginal zone also contain K-feldspar, chlorite, quartz, barite, pyrite, hematite and Nb-rutile; many are richer in silicates than the core rocks and may have been contaminated with country rock gneisses during emplacement or metasomatically altered. Mineral analyses of these phases are given in Secher and Larsen (1980).
Niobium, as pyrochlore is closely related to a series of ring dike structures enclosing the central core of the complex. Pyrochlore is also found in lower, but potentially economic concentrations within carbonatites, previously misidentified as radioactive shear zones.
Bedini (2009) describes the outer ring structures as 50 to 200 meter wide radioactive shear zones that consist of strongly limonitized, hematized, jointed and crushed gneisses. They show as thorium and uranium anomalies on the radiometric maps. Most of them follow valleys and streams formed mostly because of the friable and soluble nature of these rocks. Recent evaluation has yet to confirm any evidence of shearing, but the zones correlate with abundant carbonatite occurrences and are now interpreted as carbonatite dike swarms.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 28 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Figure 6-3: Regional Magnetic Map Showing the Carbonatite Near the Center of the Image
6.2 Local and Property Geology
The geology of the license area received little historical attention beyond preliminary descriptions by GEUS/GGU (Secher et al., 1981) and NMR (Barnes, 1999, 2000, & 2001). Hudson exploration programs focused on drilling known occurrences of REE mineralization at prospects identified by NMR. Geochemical sampling programs and geophysical surveys were limited in scope. Preliminary systematic geologic mapping, rock chip sampling, soil geochemical surveys, geophysical surveys, and mineralogical characterization programs were initiated by NNSR in 2023.
6.2.1 Rock Units
The Archean enderbitic gneiss occurring in the SE of the license area is a regionally mapped granulite facies unit (Figure 6-1). The Paleoproterozoic Nagssugtoqidian gneiss occurring in the NW of the license area was subject to later shearing and thrusting. This unit is regionally differentiated from the Archean gneiss by its hosting deformed Kangamiut dikes and local retrograde amphibolite facies mineral assemblages. Kangamiut dikes hosted in the Nagssugtoqidian gneiss can lack evidence of deformation. In practice, the two gneiss units are not reliably differentiated during field mapping or core logging, though structural analysis indicates a change in tectonic setting across the contact mapped by GEUS. Though local variations (granitic gneiss, amphibolite gneiss, granodiorite, granite, pegmatite, aplite) can be mapped and/or correlated between drill holes, these units are simplified and combined as granite gneiss (GGN) for license scale mapping and deposit modeling.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 29 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Abundant mafic bodies are mapped and logged within the license. Rock types identified include gabbro, dolerite, diorite, lamprophyre, basic dike, alkaline mafic intrusion, pyroxenite, amphibolite, metabasite, and mafic gneiss. Evidence for multiple phases of mafic intrusion is lacking, so mafic units are either included as mafic bands within the granite gneiss or interpreted as Kangamiut dikes (GAB).
The carbonatite (CARB) core of the system is no longer accessible, due to increased restrictions on entering Arnangarnup Qoorua. Previous geophysics, mapping and descriptions must be relied upon and are summarized in Section 6.1.
The outer ring structure of the carbonatite (CARB) system hosts significant REE mineralization and is the focus of current exploration efforts.
The carbonatites occur as swarms of narrow dikes. The dikes range from hairline fracture fillings to drill intercepts exceeding 100 m. True thicknesses are poorly established, but individual dikes likely reach 10s of m in thickness. Individual dikes can occur in almost any orientation but have a statistical preference for orientations consistent with radial and concentric dikes around the central mass of carbonatite and locally conform to wall rock foliation. The swarms are subvertical and can exceed 700 m in width. Based on the geometry of carbonatite occurrences around the central mass, the carbonatite dike swarms are identified as a ring dike structure. Though preexisting structures, such as foliation planes are observed to locally affect carbonatite emplacement, the carbonatite seems to have been emplaced within an isotropic stress environment with deposit-scale intrusions conforming to radial and concentric orientations about the central carbonatite mass. Previously mapped radioactive shear zones are now interpreted as carbonatite exposures. No evidence of shearing is observed, and radioactivity is due to thorium enrichment in REE mineralized carbonatite.
The dominant carbonatite type is dolomite carbonatite, though the best mineralized examples might be classified as ferrocarbonatite. Multiple phases of carbonatite are recognized but are generally not mappable or reliably correlated between drill holes. Variations include fine-grained, grey dolomite carbonatite, potassium feldspar carbonatite porphyry, apatite-rich carbonatite, white carbonatite dominated by coarse-grained ankerite, carbonatite matrix breccia, and red ferrocarbonatite. The carbonatites do not appear to be affected by oxidation due to weathering or hydrothermal alteration, as iron oxide minerals often coexist with unoxidized sulfides. Carbonatites hosting the highest grades of REE mineralization tend to host masses or pseudomorphs composed of abundant, fine-grained, earthy hematite. These mineral aggregates are rich in Fe, Ca, Ba, REE, and Th; and host an inconsistent variety of fine-grained REE minerals, carbonates, phosphates, sulfates, and oxides. Where occurring as pseudomorphs, these masses tend to be hexagonal; and the primary mineral might be burbankite.
Most carbonatite dikes do not crop out; and those that do are typically not large enough to be mapped as units at the complex scale. Carbonatite occurrences are plotted as points and lines in Figure 6-4 to visualize their spatial distribution.
Two breccia (BX) types are identified in the area. A small (65 x 40 m) diatreme is exposed in the ST1 resource area. Other, very small carbonatite matrix intrusion breccias are common throughout the outer ring structure. Neither breccia type appears to host significant REE mineralization.
A zone of sodic fenite is mapped by GEUS, surrounding the carbonatite core. Other evidence of fenitization is restricted to a red staining of the wall rocks in a halo extending from the sodic fenite zone to the outer ring structure hosting carbonatite dike swarms.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 30 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Figure 6-4 Geologic Map of the Sarfartoq Carbonatite Complex
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 31 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Glacial sediments are mapped as undifferentiated drift (DRFT), but consist of till, moraine, and outwash. Much of the carbonatite complex is hidden beneath glacial sediments, which also obscure the radiometric signature of the carbonatites.
Colluvial deposits and landslides (COL) are common, especially along the glacial valley walls through the center of the Project. Alluvium (AL) occurs in small amounts along valley floors, except in the large glacial valley bisecting the license.
6.2.2 Structural Analysis
The structural geology of the Project is poorly understood, but is of paramount importance, as the carbonatite dikes are structurally controlled. More than 1,300 planar structures were measured in 2024 to support a structural analysis of the license area. The focus was on the carbonatite rich areas north of Arnangarnup Qoorua.
FOLIATION: The ST1 to ST31 trend appears to fall along the steeply dipping NW limb of a major NE plunging anticline. Near horizontal foliations at ST40, ST34, and ST37 indicate these prospects lie within the hinge zone of the fold, or in a different domain as mapped by GEUS. Previous mapping indicates that the ST1 ST31 trend lies within the Paleoproterozoic Nagssugtoqidian gneiss, while the prospects to the SE lie within the Archean gneiss. Foliation measured at ST34 appears to capture a fold with an axial plane dipping about 58° at an azimuth of 186°. It's axis plunges about 18° at a trend of 108° azimuth. The interlimb angle is 80° (tight). The 10 foliation measurements at ST43 appear to have captured isoclinal folding with ENE axial plane orientations.
Carbonatite occurrences along the ST1 ST31 trend are concordant with mapped and measured structures. The trend of carbonatite occurrences from ST34 to ST43 is also concordant with E-W foliation in those areas. The foliation measurements indicate that the major trends of carbonatite emplacement immediately north of Arnangarnup Qoorua might be controlled by Precambrian structures rather than a stress field imposed by the intrusion itself. This might explain difficulty in delineating NdPr-enriched mineralization at ST40, if near horizontal structures are a control on carbonatite emplacement there.
VEINS: Veins are dominantly composed of quartz. Other veins are composed of epidote ± chlorite and calcite. The veins tend to be oriented subparallel to foliation across the mapped area (Figure 6-5 and Figure 6-7). This indicates veins are orogenic and not controlled by carbonatite emplacement.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 32 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Figure 6-5 Foliation
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 33 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
QUARTZ VEINS: Quartz veins dip moderately to the NW, with a smaller, subvertical population trending NNW. This indicates quartz veining is subparallel to foliation and cleavage and most likely orogenic, predating carbonatite emplacement.
Figure 6-6 Stereonet: Quartz Veins
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 34 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Figure 6-7 Veins
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 35 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
CARBONATITE DIKES: Most observed dikes are composed of carbonatite. Other rock types occurring as dikes include aplite, pegmatite, and lamprophyre. Many dike orientations conform to Precambrian foliation and vein orientations at the various prospects, but most do not. This indicates that preexisting structures are a secondary control on carbonatite orientations. In general, carbonatite orientations appear to be consistent with radial and concentric dikes about the central mass of carbonatite mapped by GEUS and inferred from magnetic data (Figure 6-8).
NON-CARBONATITE DIKES: The only apparent trend in the data is a cluster of lamprophyre dikes dipping steeply to the east (Figure 6-9). It is quite possible that the non-carbonatite dikes are actually bands in the granite gneiss, with the aplite and pegmatites being textural variations of granitic layers and the lamprophyre dikes being amphibolite layers or Kangamiut gabbro dikes.
CONTACTS: The few observed contacts tend to trend NW and dip steeply. Observed breccia contacts are rare and nearly horizontal (Figure 6-10).
FAULTS: The few observed faults trend NE and dip steeply (Figure 6-10).
Observed jointing around the northern part of the complex indicates orthogonal NW and NE trending, near vertical joint sets, or perhaps concentric and radial jointing around the central carbonatite stock. There is no evidence of a preexisting joint fabric, nor a syn-intrusion tectonic controlled joint set facilitating carbonatite emplacement (Figure 6-11).
ALL JOINTS: The two strongest populations of joints trend ENE with near vertical dips and NE with steep dips to the SE. There is also a strong population of NW trending joints with near vertical dips and a weaker NNE trending set of near vertical joints. All rock types are Precambrian and located in a stable craton. Jointing is likely related to carbonatite emplacement rather than tectonic deformation (Figure 6-12).
JOINTS GGN: Dominant orientations mimic those of the total joint data set. Other pre-carbonatite rock types have a preference for steep joint orientations, but lack evidence for preferred trends (Figure 6-13).
JOINTS AGN: Joints in AGN include those found in mafic bands of the granite gneiss as well as those found in deformed Kangamiut dikes. The prevalence of subvertical orientations and the similarity to GGN jointing indicate that jointing in the AGN unit is related to carbonatite emplacement rather than tectonics (Figure 6-13).
JOINTS GAB: The GAB unit in this context describes undeformed Kangamiut Dikes. The predominance of near vertical orientations and similar trends to AGN joints indicate jointing is not related to tectonics, but rather related to cooling of the Kangamiut dikes themselves and/or carbonatite emplacement (Figure 6-13).
JOINTS CARB: Though contouring reveals a weak clustering of SW dips, no strongly preferred orientations are apparent in joints hosted in carbonatite. Joints in carbonatite are likely cooling related and lack preferred orientation due to a lack of deformation since emplacement (Figure 6-13).
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 36 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Figure 6-8 Carbonatite Dikes
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 37 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Figure 6-9 Stereonets: Carbonatite Dikes (l) and Non-Carbonatite Dikes (r)
Figure 6-10 Stereonets: Contact (l) and Faults (r)
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 38 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Figure 6-11 Joints
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 39 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Figure 6-12 Stereonet: All Joints
The structural setting of the Project area is consistent with regional mapping by GEUS. The Nagssugtoqidian terrain NW of the main carbonatite mass is composed of granitic gneiss deformed during the Paleoproterozoic; and hosts deformed Kangamiut dikes. The Archean terrain to the SE hosts undeformed Kangamiut dikes. In the area north of Arnangarnup Qoorua hosting abundant carbonatite, the exposed Nagssugtoqidian terrain consists of the limb of a major, north plunging anticline. The exposed Archean terrain hosts E-W trending isoclinal folds. The general outcrop pattern of carbonatite is coincident with these major structures. Combined with local observations of carbonatite dikes exploiting foliation planes, this indicates that preexisting structures are a significant control on carbonatite emplacement.
Observed carbonatite dike contacts conform to expected ring and radial dike patterns about the main carbonatite mass and do not correlate with stereonet plots of preexisting structures such as foliation and veins. This indicates both the lack of a tectonic stress field during emplacement and that the primary control on carbonatite emplacement was the stress field created by the carbonatite intrusion itself. Preexisting structures are therefore considered to be a secondary, local control on carbonatite emplacement.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 40 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
GGN AGN
GAB CARB
Figure 6-13 Stereonets: Joints by Rock Unit
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 41 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
7.0 EXPLORATION
7.1 Rare Earth Exploration
In 2009, diamond exploration was halted in favor of rare earth exploration. The objective was to test previously reported REE mineralization associated with the outside ring structure of the SCC. To this affect a sampling and prospecting program was undertaken in late June and July. Based on the positive results of this program, a reconnaissance drill program was executed between September 5 and 25, 2009. The objectives were to drill test the areas where anomalous grab samples were taken during the earlier summer work. These areas were not previously drilled.
In 2010, exploration increased in scope with ground geophysics and trenching complimenting an expanded drilling and sampling program. In addition, a new camp was established closer to the property. In 2011, a larger program of drilling, prospecting and geophysics was conducted. Work carried out from early May to late September in 2011 included:
An additional 31 rock chip samples were collected and sent for assay.
A 7-tonne bulk sample was collected from the ST1 zone and sent for assay.
A diamond drilling program of 71 holes totaling 16,292 m began to delineate the ST1 zone and test new prospective areas.
Numerous ground geophysical grids were surveyed at the ST1, ST19 and ST24 zones.
Both medium and high-definition DEM was purchased, covering the entire Sarfartoq carbonatite as well as some surrounding areas including Robinson Bay.
An Environmental Impact Assessment (EIA) was initiated with studies done on local flora and fauna.
A Preliminary Economic Assessment study was initiated, and engineers were on site in July.
Socio-economic talks began and were conducted in various towns and communities proximal to the Project area.
The PEA was completed with an effective date of 25 November 2011, including a resource estimate. This study is considered historic and is not in compliance with current NI 43-101 standards.
In 2012, economic interest in REE declined. Additional drilling occurred at Sarfartoq, but results were not incorporated into the ST1 resource estimate, until recently. Baseline studies and community consultation necessary to complete an EIA and Social Impact Assessment (SIA) were suspended and the Project entered a period of care and maintenance.
The Project remained idle until 2023, when the license was transferred from Hudson to Qaatsuitsup Ulloriaa (NNSR). The 2023 program consisted of:
Renewed metallurgical studies at SGS utilizing stored Hudson samples.
Re-establishment of a field camp (Neo Camp — now renamed by GRML to ‘Sarfartog Camp’).
Environmental baseline studies, in preparation for the EIA.
Resumed socio-economic impact consultations, in preparation for the SIA.
Preliminary geologic mapping and rock chip sampling.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 42 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Preliminary ground geophysics surveys.
Preliminary soil geochemistry surveys.
Infill drilling at the ST1 Resource area.
Mineral characterization study.
The 2024 program lacked drilling, but REE exploration efforts began in earnest. Components of the program included:
Continuing metallurgical studies at SGS, on 2011 drill core.
Geologic mapping and rock chip sampling.
Ground geophysics surveys.
Soil geochemical surveys.
7.2 Sampling and Prospecting
Sampling and prospecting by Hudson from 2009 to 2012 included small ground geophysics surveys, rock (Figure 7-2) and stream sediment sampling, and reconnaissance mapping focused on known radiometric anomalies (ST1, ST40, ST19, & ST24).
There has yet to be a comprehensive, property-wide sampling and prospecting program. This work began with the 2023 and 2024 programs began this work in a limited fashion.
A geologic mapping program began in earnest in 2024. A total of 109 rock chip samples were collected in conjunction with geologic mapping in 2024. Results confirm significant REE mineralization across the northern block of the license as well as at ST24 (Figure 7-1).
Soil geochemistry programs in 2023 and 2024 sampled a total of 1,114 sites. The strongest REE anomaly overlies ST1, where significant REE mineralized carbonatite crops out. Mineralized trends from ST1 to ST31 and from ST1 through ST40 to ST43 are marked by REE soil anomalies (Figure 7-6). Neodymium in soils mimics TREE (Figure 7-8). The ST1 to ST31 trend and ST43 host HREE soil anomalies, which are absent from ST40 and ST37 (Figure 7-7). Carbonatites identified SE of Neo Camp are marked by slightly elevated REE in soils (Figure 7-6).
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 43 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Figure 7-1 Rock Chip Sample Results, 2024
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 44 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Figure 7-2 Thematic Results for Historic Rock Chip Samples
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 45 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Figure 7-3 Soil Geochemistry Results, 2023 - 2024
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 46 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Figure 7-4 Nd in Soil
Figure 7-5 Dy in Soil
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 47 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
ST1: Since 2009, the ST1 area has produced the most significant results for Hudson and NNSR, with wide zones of REE-bearing ferrocarbonatite dike swarms identified in drill holes. The REE grades in these zones are considered to be potentially economical.
A strongly gossanous area at ST1 is highlighted by a strong radiometric anomaly that centers in a steeply cut, north/south running gully. Veins and veinlets of ferrocarbonatite crop out along the eastern slope of the gully over a distance of approximately 400 m; and REE bearing ferrocarbonatite is plentiful where thick overburden covers the slope. Surface rock samples with TREO concentrations from 1-10% are common.
Prospecting and rock geochemical sampling conducted by Hudson confirmed the potential for extensive and potentially economic REE mineralization at ST1. Work by NNSR in 2023 and 2024 focused on infill drilling, a soil geochemistry survey, and geophysical surveys. Few rock chip samples were collected. A preliminary soil survey over ST1 in 2023 indicated that soil geochemistry would be an effective exploration tool at Sarfartoq, and the survey was extended across much of the northern part of the carbonatite complex. The preliminary survey also indicated that pXRF analysis was adequate to detect REE concentrations found in soils overlying the ST1 resource. It was discovered in 2024 that pXRF analysis is not adequate for detecting REE concentrations in soils across the entire property. The ST1 area hosts the most robust REE in soil anomaly identified to date (Figure 7-6).
Figure 7-6 Thematic Historic Rock Chip Sample Results for the ST1 Zone
ST40: Historic assay results from the area show considerably higher percentages of neodymium relative to TREO than the other targets, making ST40 a highly prospective target (Figure 7-7). NNSR soil geochemistry indicates a potential trend of Nd enrichment extending from ST40, through ST 37 to ST43 (Figure 7-4). The ratio of Ce:Nd is variable, indicating that previously identified Nd enrichment relative to La+Ce is not evenly distributed across ST40. Rock chip samples collected in 2024 also have variable Ce:Nd ratios, with few mineralized samples containing Nd>Ce.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 48 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Figure 7-7 Results of Samples Collected Previously at the ST40 Zone
ST19: ST19 is a highly prospective area following the southern extents of the SCC outer ring structure and the associated radiometric anomaly. The radiometric anomaly and associated gossan are coincident with the river that cuts through the area from east to west. The area of interest is approximately 4 km long by 1.5 km wide. Hudson collected numerous surface samples containing 8 to 10% TREO, prompting drill programs in 2009 to 2011 with mixed results. NNSR has conducted no significant exploration activity at ST19.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 49 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Figure 7-8 Thematic Sample Results for the ST19 Zone
ST24: The ST24 area lies along the eastern rim of the SCC associated ring structure. It is coincident with a high radiometric signature and is a large gossanous area. Terrain-wise it differs from ST1 and ST19. The anomaly lies on top of the bluffs overlooking the Sarfartoq Valley to the north. There is no deeply cut river valley through the heart of the anomaly like those found at both ST1 and ST19.
Hudson collected numerous samples containing >10% TREO. Drilling in 2010 and 2012 failed to intercept such well mineralized material subsurface. Minor follow up mapping and sampling by NNSR confirms an abundance of REE mineralized carbonatite exposed at ST24.
ST31: Rock chip and soil samples collected from the ST30 and ST31 anomalies confirm the presence of REE mineralized carbonatite. These targets represent the potential NE extension of mineralization at ST1 and are logical drill targets to extend known mineralization.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 50 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
ST34: The 2 km long ST34 Th anomaly received its first significant evaluation in 2024. Abundant carbonatite was observed, but rock chip samples indicate only weak REE mineralization (<0.3% TREO; <500ppm Nd). The soil survey indicates a lack of anomalous REE concentrations.
ST37: The area falls along an ENE trend of REE enrichment from ST1 to ST43 and is marked by airborne and ground radiometric Th anomalies. Steeply dipping, E-W trending carbonatite dikes are mapped through the anomalies. Though most rock chip samples are weakly anomalous with respect to REE concentrations (<0.3% TREO), one sample contains 1.71% TREO. A significant REE in soil anomaly occurs at ST37. This anomaly is similar to the REE in soil anomaly at ST40 in that it indicates HREE enrichment compared to other REE targets in the SCC.
ST43: The ST43 target lies along the face of Sarfartoq Valley wall and is extremely rugged. This prospect also received its first significant evaluation in 2024. The first rock chip samples from the anomaly are only weakly mineralized (<0.3% TREO; <500ppm Nd), but a small batch of soil samples identified a strong REE anomaly with significant HREE enrichment. This target warrants additional mapping and sampling as well as exploratory drilling.
7.3 Geophysics
Multiple geophysical surveys were conducted on or include the Sarfartoq license area. The carbonatite complex was discovered during a 1975 1976 airborne radiometric survey (Secher, 1976). Multiple magnetic/ electromagnetic surveys were conducted in the late 1990s for Softrock Petroleums LTD (1996), Platinova (1997), Monopros (1998), GEUS (O’Connor, 1999), and NMR (Barnes, 2001). The NMR survey was carried out in 1999 and also included radiometry, the most useful survey conducted on the property with regard to REE and Nb exploration (Figure 7-9 and Figure 7-10). In 2002, NMR followed this up with ground based radiometrics. A hyperspectral survey targeting kimberlites was flown over central West Greenland for GEUS, in 2002 (Tukiainen, 2002). Hudson conducted seismic surveys on the Garnet Lake diamond project in 2006 and 2007, followed by numerous small ground based electromagnetic, magnetic, radiometric, and gravity surveys over REE targets in 2010 and 2011. Hudson’s geophysical surveys were successful in proof of concept, but generally covered areas too small to provide context and identify significant anomalies. Each of the historic geophysics data sets may be accessed via the Greenland Mineral Resources Portal (greenmin.gl).
In 2023, NNSR conducted small geophysical test surveys using a gamma ray spectrometer and radon detectors. Finally, in 2024, NNSR followed up its successful ground gamma radiometrics test with a survey over much of the northern part of the SCC and expanded Hudson’s ground based gravity survey.
The 2009 airborne radiometrics and magnetic survey for NMR was pivotal in defining the extent of the SCC and identifying the major pyrochlore and REE prospects. Thorium is trivalent and has a similar ionic radius to the REE. As a result, Th is nearly ubiquitous in REE minerals and REE deposits. Its strong association with REE mineralization facilitates radiometric exploration methods, with REE mineralization manifest as radiometric Th highs. Fenitization, or alkali ferric iron metasomatism, is the manifestation of hydrothermal alteration associated with carbonatite magmatism. Fenite mineral assemblages often include alkali feldspars, biotite, sodic pyroxene, alkali amphibole, hematite, sulfides, apatite, fluorite, and REE minerals. The alkali feldspar component is often potassic, forming radiometric K highs as aureoles around carbonatites. The alkali ferric iron effect is the tendency for ion to become stabilized in the ferric state in highly alkaline fluids or melts. Fenitization is therefore prone to be magnetite destructive, crystallizing ferric iron bearing phases such as hematite (Mariano, 1988). Magnetic lows, especially when coincident with radiometric highs, are therefore prospective for carbonatite/fenite/REE occurrences. At Sarfartoq, surficial thorium anomalies mark surface occurrences of the carbonatite ring dike structures; and coincident magnetic lows confirm that the outer ring structure continues at depth (Figure 7-9 and Figure 7-10).
A 2010 magnetic survey over the ST40 area added detail to the survey area, but was of limited extent, only covering the ST40 and parts of the ST1 and ST31 areas. Numerous significant drill intercepts correlate with
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 51 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
magnetic lows (Figure 7-11); and a prominent magnetic low extends from ST1, through the ST1-ST40 corridor and ST30, to ST31 (Figure 7-12). Expansion of the ground magnetic survey is highly recommended for future drill targeting.
Figure 7-9 Airborne Thorium Radiometrics, NMR (1999)
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 52 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Figure 7-10 Airborne Magnetics, NMR (1999)
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 53 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Figure 7-11 Drilling and Magnetics (MVI Amplitude) at ST1
Figure 7-12 Ground Magnetics
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 54 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Figure 7-13 Ground Gravity Survey
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 55 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
The 2024 gravity survey conducted by Magee Geophysics and processed by Ellis Geophysical Consulting covered most of the northern part of the SCC ring dike structures (Figure 7-13). An earlier gravity survey from Hudson was merged with the 2024 data. Strong NE and NNW trending density lows correlate with regional metamorphic structures and major zones of carbonatite emplacement. The most striking feature is a NE trending density low extending from ST1 through ST30, ST31, and continuing to the area around Neo Camp. This anomaly correlates with carbonatites found along the major north to NE trending fold limb in that area. The WNW trending density low is coincident with the ST34 and ST43 carbonatite occurrences and E-W oriented fold axes interpreted from foliation measurements. Overlapping Th highs and gravity lows are therefore considered prospective. An interesting feature of the gravity survey is that the ST40 mineralization is coincident with a density high (Figure 7-14). This is hypothesized to be due to abundant barite associated with the carbonatite in this area, but the best mineralized intercept at ST40 occurs in a break along the density high). The ST1 resource also appears to occur in a low density break in a large linear density high (Figure 7-15 and Figure 7-16). The observation of breaks along density highs could indicate fenitized country rock hosting carbonatite.

Figure 7-14 ST40 Drilling Superimposed on Density
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 56 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Figure 7-15 ST40 Drill Intercepts Associated with a Break in a Density High
Figure 7-16 ST1 Resource Drilling Between Density Highs
A test program was conducted in 2023, utilizing Thoron Pairs, provided by Radonova, a radon gas testing company. Goals of the Thoron Pair survey included increasing the resolution of known Th anomlaies at the drill target scale and detecting thorium anomalies beneath glacial till, lakes, and alluvium.
Radon (Ra) surveys are an established exploration method for uranium deposits obscured by cover. By conducting a radon survey, one can infer where U anomalies might exist. It is not necessary to differentiate between the isotopes of Ra, as the short half-life of the Th daughter Ra-220 (Thoron) results in much lower diffusion than the U- 238 daughter Ra-222 (Radon).
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 57 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
The 2023 Thoron survey at Sarfartoq was an innovative approach, attempting to track known Th anomalies beneath cover. A successful survey would require detectors that can differentiate between Ra-220 and Ra-222. It would also require a source of Th of high enough concentration and shallow enough depths to overcome the short half-life of Ra-220.
Two hundred Thoron Pairs were ordered from Radonova, in May of 2023. Two sample grids were laid out: one extending from ST1 to ST40, and another at ST24. Nominal site spacing was 100 m, with a line spacing of 200 m. The survey grids were planned to cover known Th anomalies in areas of abundant outcrop as well as covered areas, which appear as Th lows in previous surveys. Five pairs were located around Camp as controls. A successful test of the Thoron Pairs would result in (1) strong correlation with Th anomalies identified by previous surveys and
(2) extensions of those anomalies beneath covered areas.
Sites were moved or cancelled if they were on outcrop, in a body of water, or if the ground was saturated. One hole was dug at each site. Depths ranged between 10 and 30cm, with an average of 16cm. Measurement time ranged from 33 to 46 days, with an average of 40 days. Field duplicate results varied from about 15 to 26% (Table 7-1 and Figure 7-17).
Table 7-1 Thoron Pair Duplicate Results
Site ID Primary |Duplicate |Primary - Duplicate |Primary / Duplicate \TO11 | 17635] 21674| -4039| 18.64
|T033 | 36635] 31961] 4674| 14.62
T060/TJO26 29288 24647 4641 18.83
TJ041/TJ042 7678 10431 -2753 26.39
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 58 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Figure 7-17 Thoron Pair Duplicate Results
Two Thoron Pairs were opened at the end of the program and submitted as blanks. The results were below detection for Thoron and Radon (Table 7-2). The results for an unburied pair placed in the core logging tent are also below detection. Two pairs buried at Camp have mid-range results. One sample was placed directly over a well mineralized carbonatite dike at ST1. This site successfully produced one of the highest concentrations of Thoron, exceeding the 70,000 kBqh/m3 exposure limit of detection. The results at this site confirm the Thoron Pairs successfully detect high Th concentrations. The only other overlimit in the survey was from a site that does not correlate with very high Th in the 1999 airborne survey, indicating the Thoron pairs likely test more localized areas than spectrometer surveys.
Table 7-2 Thoron Pair Blank Results
Ten of the Pairs were recovered from the surface, having been pulled out of the ground. One of these was partially pulled into another hole, nearby. Foxes are the most likely culprit.
A total of 16 analyses were below detection for Radon exposure, 6 of which are also below detection for Thoron. Detection limits ranged from 30 to 77 kBq/m3. A total of 17 samples were below detection for Thoron exposure, 6
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 59 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
of which are also below detection for Radon. Detection limits seem quite variable, ranging from 31 to 1,121kBqh/m³. It is unclear how detection limits are determined by Radonova.
Results were plotted over the 1999 NMR radiometric survey, and the results of the two surveys correlate poorly. The Th low at the NE corner of the ST1 to ST40 survey (Figure 7-18) is due to thick moraine and soil cover, with the water table near the surface. The Thoron Pairs failed to detect any Th anomalies in this area. The SE part of the Thoron Pair survey at ST24 (Figure 7-19) hosts a lake and saturated ground with an associated airborne Th low. The Thoron Pairs failed to detect any Th anomalies there either. Numerous Thoron Pair highs occur in airborne Th lows and vice versa, at both survey areas.
The survey is considered a technical success, as the detectors clearly identify thorium enrichment. However, the detectors seem to identify localized zones of thorium enrichment and more closely spaced sample sites would be required to generate useful anomalies. For practical purposes, the survey seems to have failed, as the results correlate poorly with those of previous surveys and the Thoron Detectors failed to identify anomalies beneath cover.
Figure 7-18 Thoron Pair Results ST1 to ST40
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 60 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Figure 7-19 Thoron Pair Results ST24
A ground gamma radiometric survey was conducted using a backpack mounted Medusa MS700 gamma ray spectrometer. Lines were oriented N-S at a 100 m spacing; and spectral gamma measurements were taken every 3 seconds. Approximately 300 line km and 243,607 spectra are included in the survey. The resolution is significantly higher than the airborne survey conducted by NMR in 1999 and coverage extends to the northern boundary of the license (prior to the 2024 expansion). Future surveys are planned to cover the entire SCC, within the exploration license.
Overall, the results of the ground gamma survey agree with the 1999 airborne gamma survey. The increased resolution should be used as a guide to support continued exploration and drill targeting along anomalies stretching from ST1 to ST31 and from ST1 to ST40, as well as guiding detailed drill planning within the previously drilled areas. Expanding the survey across the entire property is recommended to guide drill targeting in the ST37 to ST 40, ST24, and ST19 prospects. Additional targets might also be identified, and the extent of the system would be better defined (Figure 7-20).
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 61 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Figure 7-20 Ground Gamma Survey Results (2023 - 2024)
7.4 Drilling
Drill results indicate that REE mineralization is associated with coarse-grained bodies classified as ferrocarbonatite, also called ferroan carbonatites, formed mostly of ankerite, ferroan dolomite, siderite, and barite. The REE are associated with coarse grained hexagonal pseudomorphs and amorphous masses dominantly composed of hematite and ankeritic-calcitic. The masses also contain fine-grained REE fluorocarbonates and phosphates as well as a host of fine-grained gangue minerals including apatite, barite, and strontianite.
The enclosing granitic to granodiorite gneisses are weakly to pervasively fenitized with an assemblage including K-feldspar, hematite, aegirine and ferrocarbonates. Within the alteration zones, stringers and veins of carbonates hosting barite and hematite masses are common. The veins are usually multiphase, multidirectional, and cross cutting. Outside of the main alteration zone, fractures in the granitic gneisses tend to be weakly fenitized and hematite stained. Fine-grained light grey carbonatite dikes, micro dikes and intrusive breccias are commonly associated with fenitization and are present in all drill holes. Sulfides are ubiquitous and include mostly pyrite. Sphalerite, galena, and chalcopyrite are observed locally.
Drill targets are coded after thorium anomalies identified by NMR. Hudson drilled the ST1, ST19, ST24, ST31, and ST40 targets from 2009 to 2012. Drilling by NNSR in 2023 focused on ST1, with two holes collared between ST1 and ST40. All drilled areas are strongly enriched in LREE, but the relative abundance of REE varies from area to area. The high ratio of neodymium at ST40 and ST1, in comparison with other world-wide deposits, is an important economic driver for the Company’s exploration and development program.
Significant intercepts are presented in Table 7-3 for the 2023 drill program, as well as historic significant intercepts for ST19, ST24, and ST40. Historic intercepts are not considered relevant at ST1, as the mineralization is sufficiently drilled to facilitate resource estimation.
The highest historic drill sample contained 8.09% TREO over 2 m, in SAR10-23, drilled at ST19. A 2 m, 7.98% TREO sample was drilled in SAR10-22, also at ST19. Other 7.5% TREO drill samples are from SAR11-71 (2 m of
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 62 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
7.5% TREO) and SAR12-03 (2 m of 8.04% TREO) at the NE edge of the ST1 resource, and SAR11-50 (2 m of 7.96% TREO) in the area between ST1 and ST40. Numerous drill samples from the 2023 drill program exceed 7.5% TREO, with 6 samples besting the highest historic TREO value. These samples were collected from SAR23- 09 (2.07 m of 9.09% TREO), SAR23-14 (1.15 m of 7.68% TREO), and SAR23-15 (1.45 m of 7.66% & 1.17 m of 11.97% TREO) at the NE end of the ST1 resource; and SAR23-16 (1.52 m of 7.51%, 0.6 m of 8.01%, 0.94 m of 8.16%, 2.07 m of 9.09%, 1.2 m of 9.27%, & 0.32 m of 11.79% TREO) in the area between ST1 and ST40. This concentration of exceptionally high REE grades at the NE edge of the ST1 resource and in the ST1 to ST40 corridor is a positive indication that REE grades increase to the NE, making the area between ST1 and ST40 a prime exploration target.
Table 7-3 Significant Intercepts in Historic Core Holes
| | | | | | | | | | | | | | | | | | | | |
ST1 to ST40 Corridor |
DRILL HOLE FROM(m) TO(m) INTERVAL(m) TREO(%) NdPrOx/TREO Nd2O3 + Pr2O3(%) |
SAR11-47 | 103.00 | | 105.00 | 2.00 | | 2.45 | | 18 | % | 0.45 | |
SAR11-47 | 107.00 | | 109.00 | 2.00 | | 2.38 | | 19 | % | 0.45 | |
SAR11-48 | 112.00 | | 121.00 | 9.00 | | 1.46 | | 20 | % | 0.30 | |
SAR11-48 | 139.60 | | 140.40 | 0.80 | | 3.01 | | 19 | % | 0.58 | |
SAR11-50 | 104.00 | | 110.00 | 6.00 | | 1.12 | | 18 | % | 0.20 | |
SAR11-50 | 206.00 | | 220.00 | 14.00 | | 3.26 | | 17 | % | 0.55 | |
Including | 206.00 | | 210.00 | 4.00 | | 7.15 | | 17 | % | 1.19 | |
SAR11-52 | 203.70 | | 204.90 | 1.20 | | 5.46 | | 18 | % | 0.99 | |
SAR12-10 | 23.00 | | 25.00 | 2.00 | | 2.42 | | 17 | % | 0.40 | |
SAR12-10 | 31.70 | | 33.33 | 1.63 | | 6.22 | | 16 | % | 1.00 | |
SAR12-10 | 94.00 | | 96.00 | 2.00 | | 3.85 | | 20 | % | 0.75 | |
SAR12-10 | 198.00 | | 206.00 | 8.00 | | 1.37 | | 18 | % | 0.25 | |
SAR12-12 | 189.00 | | 193.00 | 4.00 | | 1.85 | | 20 | % | 0.36 | |
Including | 189.00 | | 191.00 | 2.00 | | 2.21 | | 19 | % | 0.43 | |
SAR12-12 | 233.00 | | 237.00 | 4.00 | | 2.90 | | 19 | % | 0.54 | |
Including | 233.00 | | 235.00 | 2.00 | | 4.73 | | 19 | % | 0.90 | |
SAR12-15 | 88.00 | | 100.00 | 12.00 | | 3.07 | | 16 | % | 0.49 | |
Including | 90.00 | | 94.00 | | 4.00 | | 5.85 | | 15 | % | 0.87 | |
SAR12-15 | 163.00 | | 181.00 | 18.00 | | 2.34 | | 17 | % | 0.39 | |
Including | 163.00 | | 169.00 | 6.00 | | 4.34 | | 17 | % | 0.72 | |
SAR12-15 | 233.00 | | 287.00 | 54.00 | | 2.11 | | 16 | % | 0.33 | |
Including | 241.00 | | 251.00 | 10.00 | | 2.27 | | 17 | % | 0.38 | |
Including | 259.00 | | 265.00 | 6.00 | | 4.09 | | 15 | % | 0.62 | |
Including | 277.00 | | 283.00 | 6.00 | | 5.53 | | 14 | % | 0.79 | |
SAR12-18 | 38.00 | | 40.00 | 2.00 | | 2.28 | | 17 | % | 0.39 | |
SAR12-18 | 48.00 | | 56.00 | 8.00 | | 2.59 | | 17 | % | 0.45 | |
Including | 48.00 | | 50.00 | | 2.00 | | 4.45 | | 17 | % | 0.77 | |
SAR12-18 | 82.00 | | 92.00 | 10.00 | | 1.66 | | 17 | % | 0.29 | |
Including | 82.00 | | 84.00 | | 2.00 | | 2.83 | | 18 | % | 0.50 | |
SAR12-18 | 116.00 | | 124.00 | 8.00 | | 2.29 | | 16 | % | 0.38 | |
Including | 116.00 | | 118.00 | 2.00 | | 3.41 | | 17 | % | 0.58 | |
And | 122.00 | | 124.00 | 2.00 | | 3.63 | | 16 | % | 0.59 | |
SAR12-18 | 130.00 | | 136.00 | 6.00 | | 1.80 | | 17 | % | 0.30 | |
Including | 132.00 | | 134.00 | 2.00 | | 2.42 | | 17 | % | 0.40 | |
SAR12-18 | 142.00 | | 148.00 | 6.00 | | 1.06 | | 18 | % | 0.19 | |
SAR12-18 | 154.00 | | 170.00 | 16.00 | | 2.81 | | 16 | % | 0.45 | |
Including | 154.00 | | 158.00 | 4.00 | | 3.68 | | 17 | % | 0.62 | |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 63 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
| | | | | | | | | | | | | | | | | | | | |
And | 162.00 | | 168.00 | 6.00 | | 3.17 | | 15 | % | 0.48 | |
SAR12-18 | 200.00 | | 208.00 | 8.00 | | 3.48 | | 14 | % | 0.48 | |
Including | 204.00 | | 206.00 | 2.00 | | 6.89 | | 13 | % | 0.91 | |
SAR12-19 | 46.00 | | 52.00 | 6.00 | | 3.11 | | 17 | % | 0.52 | |
Including | 48.00 | | 50.00 | | 2.00 | | 4.21 | | 16 | % | 0.68 | |
SAR12-19 | 130.00 | | 136.00 | 6.00 | | 1.45 | | 18 | % | 0.26 | |
Including | 134.00 | | 136.00 | 2.00 | | 2.57 | | 18 | % | 0.45 | |
SAR12-19 | 148.00 | | 150.00 | 2.00 | | 2.89 | | 14 | % | 0.39 | |
SAR12-19 | 156.00 | | 158.00 | 2.00 | | 2.46 | | 16 | % | 0.40 | |
SAR12-19 | 160.00 | | 162.00 | 2.00 | | 4.62 | | 13 | % | 0.61 | |
SAR12-19 | 172.00 | | 174.00 | 2.00 | | 2.18 | | 15 | % | 0.32 | |
SAR12-19 | 198.00 | | 200.00 | 2.00 | | 2.70 | | 16 | % | 0.42 | |
Significant REE intercepts from the 2023 drill program are presented in
Table 7-4. Drill holes SAR23-08, SAR23-11, and SAR23-17 failed to reach target depth and were not sampled. Drill hole SAR23-13 also failed to reach target depth and has no significant intercepts. Most 2023 drilling occurred at the
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 64 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
ST1 target area, but SAR23-16 and SAR23-17 were drilled NE of the ST1 resource, between the ST1 and ST40 targets.
Significant Nb intercepts from 2023 drilling are presented in Table 7-5. While few intercepts at ST1 match the grades at the Sarfartoq No. 1 Niobium occurrence, many intercepts compare favorably with Nb grades reported at deposits such as Niobec, Araxa, and Elk Creek. Niobium grades exceeding 1% Nb2O5 were intercepted in carbonatite dikes in SAR23-01, SAR23-04, and SAR23-09, at ST1, but the most impressive mineralization was intercepted in SAR23- 16, in the ST1 to ST40 corridor. Intercepts with grades up to 5.18% Nb2O5 over 1.36 m and as thick as 131 m of 0.53% Nb2O5 indicate there is potential for significant value added from byproduct Nb, or even the discovery of a stand alone Nb deposit.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 65 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 66 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
| | | | | | | | | | | | | | | | | | | | |
DRILL HOLE F | ROM(m) | TO(m) INT | ERVAL(m) T | REO(%) NdP | rOx/TREO Nd2O3 | + Pr2O3(%) |
SAR23-14 | 205.83 | 229.26 | 23.43 | 2.69 | 20% | 0.53 | |
Including | 205.83 | | 206.66 | 0.83 | 4.54 | 19% | 0.87 | |
And | 213.00 | | 219.67 | 6.67 | 3.75 | 20% | 0.73 | |
And | 222.28 | | 223.43 | 1.15 | 7.68 | 20% | 1.51 | |
And | 224.15 | | 227.63 | 3.48 | 3.77 | 19% | 0.71 | |
SAR23-14 | 256.47 | 257.94 | 1.47 | 2.93 | 20% | 0.58 | |
SAR23-14 | 270.33 | 275.50 | 5.17 | 0.71 | 20% | 0.14 | |
SAR23-15 | 104.08 | 113.05 | 8.97 | 1.24 | 23% | 0.29 | |
Including | 104.08 | | 106.32 | 2.24 | 2.97 | 23% | 0.68 | |
SAR23-15 | 119.14 | 129.28 | 10.14 | 1.04 | 24% | 0.24 | |
Including | 124.61 | | 126.37 | 1.76 | 3.02 | 23% | 0.71 | |
SAR23-15 | 204.00 | 217.82 | 13.82 | 4.46 | 19% | 0.87 | |
Including | 211.40 | | 217.82 | 6.42 | 6.87 | 19% | 1.33 | |
SAR23-15 | 230.70 | 236.11 | 5.41 | 4.46 | 20% | 0.90 | |
SAR23-16 | 64.90 | | 65.63 | 0.73 | 2.83 | 18% | 0.50 | |
SAR23-16 | 82.30 | | 105.00 | 22.70 | 1.17 | 18% | 0.21 | |
Including | 88.73 | | 92.55 | 3.82 | 3.52 | 18% | 0.63 | |
And | 104.33 | | 105.00 | 0.67 | 4.02 | 18% | 0.71 | |
SAR23-16 | 144.10 | 149.14 | 5.04 | 6.90 | 17% | 1.19 | |
Including | 147.94 | | 149.14 | 1.20 | 9.27 | 17% | 1.59 | |
SAR23-16 | 163.46 | 173.89 | 10.43 | 2.78 | 15% | 0.42 | |
Including | 169.02 | | 171.09 | 2.07 | 8.69 | 15% | 1.29 | |
SAR23-16 | 185.21 | 204.11 | 18.90 | 2.42 | 16% | 0.39 | |
Including | 188.08 | | 189.79 | 1.71 | 3.79 | 14% | 0.55 | |
And | 191.96 | | 197.46 | 5.50 | 5.10 | 16% | 0.81 | |
SAR23-16 | 213.40 | 220.34 | 6.94 | 2.02 | 15% | 0.29 | |
Including | 219.40 | | 220.34 | 0.94 | 8.16 | 14% | 1.16 | |
SAR23-16 | 264.69 | 265.72 | 1.03 | 5.81 | 19% | 1.08 | |
SAR23-16 | 275.83 | 281.67 | 5.84 | 0.99 | 20% | 0.19 | |
Including | 275.83 | | 277.19 | 1.36 | 2.71 | 20% | 0.55 | |
SAR23-16 | 310.36 | 311.43 | 1.07 | 3.13 | 17% | 0.52 | |
SAR23-16 | 315.06 | 320.43 | 5.37 | 1.33 | 17% | 0.23 | |
Including | 315.06 | | 315.87 | 0.81 | 4.23 | 17% | 0.73 | |
SAR23-18 | 27.88 | | 29.20 | 1.32 | 2.61 | 21% | 0.55 | |
SAR23-18 | 99.20 | | 104.90 | 5.70 | 4.58 | 21% | 0.97 | |
SAR23-19 | 14.67 | | 29.30 | 14.63 | 0.55 | 22% | 0.12 | |
SAR23-19 | 63.70 | | 64.40 | 0.70 | 3.78 | 21% | 0.79 | |
SAR23-19 | 73.17 | | 103.55 | 30.38 | 0.79 | 21% | 0.17 | |
Including | 77.50 | | 78.63 | 1.13 | 2.71 | 21% | 0.58 | |
SAR23-19 | 136.23 | 137.12 | 0.89 | 3.01 | 19% | 0.58 | |
SAR23-19 | 143.78 | 150.00 | 6.22 | 1.05 | 20% | 0.21 | |
Including | 143.78 | | 144.58 | 0.80 | 3.68 | 19% | 0.68 | |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 67 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Table 7-5 Significant Nb Intercepts in 2023
| | | | | | | | | | | | | | |
DrillHoleID | From (m) | To(m) Int | erval(m) Nb | 2O5 (%) |
SAR23-01 | 20.17 | | 20.75 | 0.58 | 12.35 |
SAR23-02 | 280.66 | 287.45 | 6.79 | 0.45 | |
Including | 280.66 | 282.27 | 1.61 | 0.63 | |
SAR23-02 | 324.32 | 332.35 | 8.03 | 0.26 | |
Including | 330 | | 332.35 | 2.35 | 0.56 | |
SAR23-03 | 136.75 | 137.66 | 0.91 | 0.60 | |
SAR23-04 | 124.87 | 128.62 | 3.75 | 0.51 | |
Including | 126.58 | 128.62 | 2.04 | 0.83 | |
SAR23-04 | 195.64 | 227.68 | 32.04 | 0.28 | |
Including | 202.92 | 204.92 | 2 | 1.33 | |
And | 222 | | 223.55 | 1.55 | 0.51 | |
SAR23-06 | 43.4 | | 83.65 | 40.25 | 0.16 | |
Including | 65.65 | | 69.58 | 3.93 | 0.63 | |
SAR23-07 | 106.56 | 148.36 | 41.8 | 0.24 | |
Including | 123.85 | 135 | 11.15 | 0.50 | |
SAR23-09 | 150 | | 184.01 | 34.01 | 0.17 | |
Including | 150 | | 152.41 | 2.41 | 0.51 | |
And | 165 | | 166.36 | 1.36 | 1.02 | |
SAR23-10 | 96.35 | | 99.3 | 2.95 | 0.28 | |
Including | 98.56 | | 99.3 | 0.74 | 0.66 | |
SAR23-10 | 161.6 | | 162.49 | 0.89 | 0.56 | |
SAR23-10 | 189.84 | 193.73 | 3.89 | 0.43 | |
Including | 190.64 | 192.54 | 1.9 | 0.63 | |
SAR23-12 | 8.42 | | 18.85 | 10.43 | 0.25 | |
Including | 8.42 | | 9.13 | 0.71 | 0.51 | |
And | 13.15 | | 14.25 | 1.1 | 0.76 | |
And | 18.19 | | 18.85 | 0.66 | 0.80 | |
SAR23-12 | 187.87 | 200.08 | 12.21 | 0.19 | |
Including | 187.87 | 189 | 1.13 | 0.74 | |
SAR23-12 | 213.1 | | 235.13 | 22.03 | 0.13 | |
Including | 213.1 | | 213.68 | 0.58 | 0.83 | |
And | 227.9 | | 229.27 | 1.37 | 0.63 | |
SAR23-12 | 253.18 | 260.71 | 7.53 | 0.53 | |
Including | 255.21 | 258 | 2.79 | 0.97 | |
SAR23-14 | 180.73 | 190.09 | 9.36 | 0.28 | |
Including | 188.68 | 190.09 | 1.41 | 0.51 | |
SAR23-14 | 203.73 | 208.33 | 4.6 | 0.17 | |
Including | 206.66 | 208.33 | 1.67 | 0.50 | |
SAR23-14 | 234.88 | 245.46 | 10.58 | 0.25 | |
Including | 240.87 | 242.7 | 1.83 | 0.73 | |
SAR23-15 | 106.32 | 113.05 | 6.73 | 0.34 | |
Including | 111.63 | 113.05 | 1.42 | 0.50 | |
SAR23-15 | 119.14 | 132.46 | 13.32 | 0.20 | |
Including | 119.14 | 120.53 | 1.39 | 0.51 | |
SAR23-16 | 79.2 | | 210.38 | 131.18 | 0.53 | |
Including | 86.65 | | 92.55 | 5.9 | 1.28 | |
And | 102 | | 105 | 3 | 2.65 | |
And | 108.45 | 111 | 2.55 | 1.49 | |
And | 119.08 | 120.15 | 1.07 | 4.51 | |
And | 136.1 | | 137.73 | 1.63 | 1.46 | |
And | 144.1 | | 149.14 | 5.04 | 1.62 | |
And | 169.02 | 171.09 | 2.07 | 2.36 | |
And | 191.33 | 196.86 | 5.53 | 2.94 | |
SAR23-16 | 244.76 | 245.92 | 1.16 | 0.64 | |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 68 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
| | | | | | | | | | | | | | |
SAR23-16 | 263.2 | | 266.62 | 3.42 | 0.69 | |
Including | 264.69 | 265.72 | 1.03 | 1.87 | |
SAR23-16 | 275.83 | 281.67 | 5.84 | 1.34 | |
Including | 275.83 | 277.19 | 1.36 | 5.18 | |
SAR23-16 | 289.88 | 290.67 | 0.79 | 0.92 | |
SAR23-16 | 301.1 | | 316.8 | 15.7 | 0.22 | |
Including | 310.36 | 311.43 | 1.07 | 1.22 | |
And | 315.06 | 315.87 | 0.81 | 1.39 | |
7.4.1 Collar and Down Hole Surveys
The header information for each drill hole is presented in Table 7-6 and locations are illustrated in Figure 7-21. Historic (2009 2012) elevations in the table use the height above sea level (HASL) and have been collected using either a handheld Garmin GPS or a more accurate Trimble GPS. All historic collar elevations at ST1 were measured using the Trimble differential GPS and for the purposes of the resource estimate, the Height Above Elipsoid was used. Drill collars were professionally surveyed in 2023, by Asiaq. The projection used is WGS 84, UTM Zone 22N.
A Reflex EZ-trac tool was utilized to conduct down-hole orientation surveys of most historic drill holes. Down-hole surveys in 2023 were conducted with a Reflex Sprint-IQ continuous north seeking gyro.
Table 7-6 Sarfartoq REE Drillhole Collar Data
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
Hole ID | | Easting | | | Northing | | | Elevation | | | Depth | | Target | Azimuth | Dip | Start Date | End Date |
(m) | (m) | (m) | (m) |
SAR09-01 | 488006 | 7378969 | 693 | 105 | ST40 | 355 | -75 | 2009-09-08 |
| 2009-09-09 |
|
| SAR09-02 | | | 487935 | | | 7379060 | | | 677 | | | 122 | | | ST40 | | | 181 | | | -50 | | | 2009-09-09 | | | 2009-09-10 | |
SAR09-03 | 488078 | 7379019 | 679 | 128 | ST40 | 180 | -54 | 2009-09-12 |
| 2009-09-13 |
|
| SAR09-04 | | | 485163 | | | 7378305 | | | 645 | | | 131 | | | ST1 | | | 320 | | | -81 | | | 2009-09-15 | | | 2009-09-16 | |
SAR09-05 | 485102 | 7378429 | 570 | 149 | ST1 | 150 | -50 | 2009-09-16 |
| 2009-09-17 |
|
| SAR09-06 | | | 484955 | | | 7378255 | | | 546 | | | 137 | | | ST1 | | | 120 | | | -50 | | | 2009-09-17 | | | 2009-09-18 | |
SAR09-07 | 485096 | 7378204 | 635 | 156 | ST1 | 300 | -80 | 2009-09-19 |
| 2009-09-20 |
|
| SAR09-08 | | | 487872 | | | 7370618 | | | 540 | | | 201 | | | ST19 | | | 170 | | | -80 | | | 2009-09-21 | | | 2009-09-22 | |
SAR09-09 | 488234 | 7370545 | 542 | 201 | ST19 | 180 | -75 | 2009-09-23 |
| 2009-09-24 |
|
| SAR10-01 | | | 487946 | | | 7379682 | | | 669 | | | 342 | | | ST40 | | | 0 | | | -90 | | | 2010-05-01 | | | 2010-05-04 | |
SAR10-02 | 487925 | 7379470 | 669 | 186 | ST40 | 270 | -50 | 2010-05-04 |
| 2010-05-06 |
|
| SAR10-03 | | | 487613 | | | 7379474 | | | 669 | | | 198 | | | ST40 | | | 160 | | | -45 | | | 2010-05-06 | | | 2010-05-08 | |
SAR10-04 | 488318 | 7379003 | 695 | 219 | ST40 | 195 | -45 | 2010-05-08 |
| 2010-05-10 |
|
| SAR10-05 | | | 488054 | | | 7379045 | | | 677 | | | 164 | | | ST40 | | | 180 | | | -45 | | | 2010-05-10 | | | 2010-05-12 | |
SAR10-06 | 488054 | 7379045 | 677 | 234 | ST40 | 180 | -60 | 2010-05-12 |
| 2010-05-14 |
|
| SAR10-07 | | | 488255 | | | 7379598 | | | 672 | | | 196 | | | ST40 | | | 135 | | | -45 | | | 2010-05-14 | | | 2010-05-16 | |
SAR10-08 | 485102 | 7378429 | 570 | 379 | ST1 | 180 | -45 | 2010-05-16 |
| 2010-05-19 |
|
| SAR10-09 | | | 485102 | | | 7378429 | | | 570 | | | 250 | | | ST1 | | | 0 | | | -90 | | | 2010-05-19 | | | 2010-05-21 | |
SAR10-10 | 485172 | 7378483 | 586 | 332 | ST1 | 180 | -45 | 2010-05-22 |
| 2010-05-25 |
|
| SAR10-11 | | | 485172 | | | 7378483 | | | 586 | | | 204 | | | ST1 | | | 340 | | | -45 | | | 2010-05-25 | | | 2010-05-27 | |
SAR10-12 | 485172 | 7378483 | 586 | 156 | ST1 | 100 | -45 | 2010-05-27 |
| 2010-05-28 |
|
| SAR10-13 | | | 485211 | | | 7378325 | | | 653 | | | 384 | | | ST1 | | | 255 | | | -59 | | | 2010-05-28 | | | 2010-05-31 | |
SAR10-14 | 485211 | 7378325 | 653 | 155 | ST1 | 0 | -90 | 2010-05-31 |
| 2010-06-01 |
|
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 69 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| SAR10-15 | | | 485211 | | | 7378325 | | | 653 | | | 323 | | | ST1 | | | 255 | | | -45 | | | 2010-06-01 | | | 2010-06-04 | |
SAR10-16 | 485245 | 7378287 | 656 | 348 | ST1 | 255 | -60 | 2010-06-04 |
| 2010-06-07 |
|
| SAR10-17 | | | 485182 | | | 7378221 | | | 649 | | | 305 | | | ST1 | | | 320 | | | -55 | | | 2010-06-08 | | | 2010-06-10 | |
SAR10-18 | 487090 | 7378835 | 700 | 216 | ST40 | 330 | -45 | 2010-06-10 |
| 2010-06-12 |
|
| SAR10-19 | | | 488077 | | | 7378875 | | | 712 | | | 220 | | | ST40 | | | 0 | | | -51 | | | 2010-06-12 | | | 2010-06-14 | |
Hole ID | | Easting | | | Northing | | | Elevation | | | Depth | | Target | Azimuth | Dip | Start Date | End Date | |
(m) | (m) | (m) | (m) | |
SAR10-20 | 492168 | 7375465 | 610 | 104 | ST24 | 287 | -46 | 2010-08-17 |
| 2010-08-18 | |
| SAR10-21 | | | 492160 | | | 7375438 | | | 615 | | | 204 | | | ST24 | | | 86 | | | -44 | | | 2010-08-18 | | | 2010-08-20 | |
SAR10-22 | 489083 | 7370334 | 585 | 180 | ST19 | 85 | -59 | 2010-08-20 |
| 2010-08-22 | |
| SAR10-23 | | | 489156 | | | 7370348 | | | 585 | | | 180 | | | ST19 | | | 272 | | | -56 | | | 2010-08-22 | | | 2010-08-24 | |
SAR10-24 | 489156 | 7370348 | 585 | 159 | ST19 | 267 | -80 | 2010-08-24 |
| 2010-08-26 | |
| SAR10-24A | | | 489156 | | | 7370348 | | | 585 | | | 21 | | | ST19 | | | 265 | | | -80 | | | 2010-08-24 | | | 2010-08-24 | |
SAR10-25 | 488009 | 7370351 | 431 | 281 | ST19 | 38 | -42 | 2010-08-26 |
| 2010-08-29 | |
| SAR10-26 | | | 488009 | | | 7370351 | | | 431 | | | 32 | | | ST19 | | | 35 | | | -80 | | | 2010-08-29 | | | 2010-08-30 | |
SAR10-27 | 487366 | 7370726 | 512 | 129 | ST19 | 276 | -74 | 2010-08-31 |
| 2010-09-01 | |
| SAR10-28 | | | 487366 | | | 7370726 | | | 512 | | | 124 | | | ST19 | | | 275 | | | -43 | | | 2010-09-01 | | | 2010-09-02 | |
SAR10-29 | 486893 | 7370203 | 403 | 61 | ST19 | 40 | -80 | 2010-09-02 |
| 2010-09-03 | |
| SAR10-30 | | | 486955 | | | 7371462 | | | 480 | | | 75 | | | ST19 | | | 160 | | | -43 | | | 2010-09-03 | | | 2010-09-04 | |
SAR10-31 | 486955 | 7371462 | 480 | 143 | ST19 | 166 | -65 | 2010-09-04 |
| 2010-09-05 | |
| SAR10-32 | | | 484930 | | | 7378187 | | | 542 | | | 232 | | | ST1 | | | 93 | | | -43 | | | 2010-09-05 | | | |
SAR10-33 | 484930 | 7378187 | 542 | 312 | ST1 | 76 | -59 |
|
|
|
|
| |
| SAR10-34 | | | 484980 | | | 7378285 | | | 550 | | | 304 | | | ST1 | | | 82 | | | -45 | | | | |
SAR10-35 | 484980 | 7378285 | 550 | 171 | ST1 | 90 | -60 |
|
|
|
|
| |
| SAR10-36 | | | 484980 | | | 7378285 | | | 550 | | | 308 | | | ST1 | | | 90 | | | -53 | | | | |
SAR11-01 | 487990 | 7378962 | 695 | 181 | ST40 | 91 | -51 | 2011-05-06 |
| 2011-05-08 | |
| SAR11-02 | | | 487990 | | | 7378962 | | | 695 | | | 181 | | | ST40 | | | 91 | | | -57 | | | 2011-05-08 | | | 2011-05-09 | |
SAR11-03 | 487990 | 7378962 | 695 | 128 | ST40 | 91 | -65 | 2011-05-09 |
| 2011-05-10 | |
| SAR11-04 | | | 487745 | | | 7379032 | | | 679 | | | 256 | | | ST40 | | | 110 | | | -55 | | | 2011-05-10 | | | 2011-05-13 | |
SAR11-05 | 488170 | 7378941 | 695 | 177 | ST40 | 282 | -45 | 2011-05-13 |
| 2011-05-14 | |
| SAR11-06 | | | 488170 | | | 7378941 | | | 695 | | | 162 | | | ST40 | | | 282 | | | -50 | | | 2011-05-14 | | | 2011-05-16 | |
SAR11-07 | 487932 | 7379070 | 676 | 244 | ST40 | 90 | -50 | 2011-05-16 |
| 2011-05-18 | |
| SAR11-08 | | | 488365 | | | 7378992 | | | 695 | | | 198 | | | ST40 | | | 180 | | | -45 | | | 2011-05-18 | | | 2011-05-20 | |
SAR11-09 | 487704 | 7380711 | 751 | 235 | ST31 | 335 | -45 | 2011-05-20 |
| 2011-05-22 | |
| SAR11-10 | | | 487376 | | | 7379197 | | | 673 | | | 95 | | | ST40 | | | 180 | | | -45 | | | 2011-05-20 | | | 2011-05-23 | |
SAR11-11 | 487704 | 7380711 | 751 | 222 | ST31 | 335 | -90 | 2011-05-23 |
| 2011-05-24 | |
| SAR11-12 | | | 487376 | | | 7379197 | | | 673 | | | 332 | | | ST40 | | | 180 | | | -60 | | | 2011-05-22 | | | 2011-05-26 | |
SAR11-13a | 488048 | 7380666 | 723 | 36 | ST31 | 315 | -45 | 2011-05-24 |
| 2011-05-26 | |
| SAR11-13b | | | 488048 | | | 7380666 | | | 723 | | | 149 | | | ST31 | | | 315 | | | -45 | | | 2011-05-25 | | | 2011-05-26 | |
SAR11-14 | 487287 | 7378992 | 680 | 201 | ST40 | 180 | -50 | 2011-05-28 |
| 2011-05-30 | |
| SAR11-15 | | | 487387 | | | 7379180 | | | 675 | | | 268 | | | ST40 | | | 270 | | | -50 | | | 2011-05-28 | | | 2011-05-30 | |
SAR11-16 | 485244 | 7378286 | 656 | 249 | ST1 | 310 | -65 | 2011-05-30 |
| 2011-06-01 | |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 70 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| SAR11-17 | | | 485244 | | | 7378286 | | | 656 | | | 329 | | | ST1 | | | 310 | | | -45 | | | 2011-06-01 | | | 2011-06-01 | |
SAR11-18 | 487387 | 7379180 | 675 | 263 | ST40 | 270 | -81 | 2011-05-30 |
| 2011-06-06 | |
Hole ID | | Easting | | | Northing | | | Elevation | | | Depth | | Target | Azimuth | Dip | Start Date | End Date |
(m) | (m) | (m) | (m) |
| SAR11-19 | | | 485085 | | | 7378106 | | | 628 | | | 326 | | | ST1 | | | 310 | | | -65 | | | 2011-06-03 | | | 2011-06-06 | |
SAR11-20 | 485204 | 7378257 | 654 | 253 | ST1 | 310 | -45 | 2011-06-04 |
| 2011-06-06 |
|
| SAR11-21 | | | 485085 | | | 7378106 | | | 628 | | | 198 | | | ST1 | | | 310 | | | -50 | | | 2011-06-07 | | | 2011-06-08 | |
SAR11-22 | 485162 | 7378206 | 647 | 307 | ST1 | 310 | -45 | 2011-06-07 |
| 2011-06-09 |
|
| SAR11-23 | | | 485098 | | | 7378143 | | | 630 | | | 128 | | | ST1 | | | 310 | | | -60 | | | 2011-06-08 | | | 2011-06-11 | |
SAR11-24 | 485251 | 7378143 | 649 | 400 | ST1 | 310 | -60 | 2011-06-09 |
| 2011-06-13 |
|
| SAR11-25 | | | 485098 | | | 7378143 | | | 630 | | | 281 | | | ST1 | | | 310 | | | -65 | | | 2011-06-11 | | | 2011-06-13 | |
SAR11-26 | 485102 | 7378263 | 638 | 307 | ST1 | 310 | -90 | 2011-06-13 |
| 2011-06-14 |
|
| SAR11-27 | | | 485098 | | | 7378143 | | | 630 | | | 217 | | | ST1 | | | 310 | | | -45 | | | 2011-06-13 | | | 2011-06-15 | |
SAR11-28 | 485102 | 7378263 | 638 | 198 | ST1 | 310 | -45 | 2011-06-14 |
| 2011-06-15 |
|
| SAR11-29 | | | 485230 | | | 7378101 | | | 641 | | | 387 | | | ST1 | | | 310 | | | -65 | | | 2011-06-15 | | |
SAR11-30 | 485284 | 7378310 | 671 | 247 | ST1 | 317 | -45 | 2011-06-16 |
| 2011-06-17 |
|
| SAR11-31 | | | 485249 | | | 7378421 | | | 645 | | | 247 | | | ST1 | | | 310 | | | -90 | | | 2011-06-17 | | | 2011-06-19 | |
SAR11-32 | 485249 | 7378421 | 645 | 158 | ST1 | 301 | -65 | 2011-06-19 |
| 2011-06-19 |
|
| SAR11-33 | | | 485345 | | | 7378357 | | | 686 | | | 132 | | | ST1 | | | 310 | | | -45 | | | 2011-06-20 | | | 2011-06-21 | |
SAR11-34 | 485345 | 7378357 | 686 | 268 | ST1 | 310 | -50 | 2011-06-21 |
| 2011-06-23 |
|
| SAR11-35 | | | 485368 | | | 7378442 | | | 657 | | | 259 | | | ST1 | | | 310 | | | -50 | | | 2011-06-23 | | |
SAR11-36 | 485368 | 7378442 | 657 | 214 | ST1 | 310 | -70 | 2011-06-19 |
| 2011-06-21 |
|
| SAR11-37 | | | 485160 | | | 7378155 | | | 643 | | | 360 | | | ST1 | | | 310 | | | -65 | | | 2011-06-19 | | |
SAR11-38 | 485368 | 7378442 | 657 | 269 | ST1 | 310 | -75 | 2011-06-21 |
|
|
|
| SAR11-39 | | | 485091 | | | 7378223 | | | 635 | | | 262 | | | ST1 | | | 310 | | | -70 | | | 2011-06-23 | | | 2011-06-25 | |
SAR11-40 | 485188 | 7378340 | 647 | 192 | ST1 | 310 | -50 | 2011-06-24 |
| 2011-06-25 |
|
| SAR11-41 | | | 485091 | | | 7378223 | | | 635 | | | 192 | | | ST1 | | | 310 | | | -45 | | | 2011-06-25 | | | 2011-06-27 | |
SAR11-42 | 485217 | 7378372 | 646 | 189 | ST1 | 310 | -45 | 2011-06-25 |
| 2011-06-27 |
|
| SAR11-43 | | | 485139 | | | 7378314 | | | 642 | | | 252 | | | ST1 | | | 310 | | | -50 | | | 2011-06-27 | | | 2011-06-28 | |
SAR11-44 | 485217 | 7378372 | 646 | 116 | ST1 | 120 | -60 | 2011-06-27 |
| 2011-06-28 |
|
| SAR11-45 | | | 485217 | | | 7378372 | | | 646 | | | 153 | | | ST1 | | | 120 | | | -80 | | | 2011-07-28 | | | 2011-07-29 | |
SAR11-46 | 485331 | 7378675 | 667 | 207 | ST1 | 180 | -55 | 2011-07-29 |
| 2011-07-31 |
|
| SAR11-47 | | | 485745 | | | 7378835 | | | 671 | | | 214 | | | ST1 | | | 180 | | | -55 | | | 2011-07-29 | | | 2011-07-31 | |
SAR11-48 | 485735 | 7378857 | 675 | 246 | ST1 | 315 | -55 | 2011-07-31 |
| 2011-08-02 |
|
| SAR11-49 | | | 485331 | | | 7378675 | | | 667 | | | 240 | | | ST1 | | | 0 | | | -55 | | | 2011-07-31 | | | 2011-08-02 | |
SAR11-50 | 486258 | 7378784 | 682 | 244 | ST1 | 315 | -55 | 2011-08-02 |
| 2011-08-04 |
|
| SAR11-51 | | | 485098 | | | 7378702 | | | 688 | | | 311 | | | ST1 | | | 90 | | | -60 | | | 2011-08-02 | | | 2011-08-05 | |
SAR11-52 | 485921 | 7378567 | 676 | 259 | ST1 | 315 | -55 | 2011-08-04 |
| 2011-08-07 |
|
| SAR11-53 | | | 485324 | | | 7378541 | | | 603 | | | 76 | | | ST1 | | | 130 | | | -45 | | | 2011-08-05 | | | 2011-08-06 | |
SAR11-54 | 485324 | 7378541 | 603 | 256 | ST1 | 130 | -55 | 2011-08-06 |
| 2011-08-08 |
|
| SAR11-55 | | | 485760 | | | 7378252 | | | 676 | | | 137 | | | ST1 | | | 220 | | | -45 | | | 2011-08-07 | | | 2011-08-08 | |
Hole ID | | Easting | | | Northing | | | Elevation | | | Depth | | Target | Azimuth | Dip | Start Date | End Date | |
(m) | (m) | (m) | (m) | |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 71 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
SAR11-56 | 485324 | 7378541 | 603 | 207 | ST1 | 130 | -70 | 2011-08-08 |
| 2011-08-10 | |
| SAR11-57 | | | 489119 | | | 7370340 | | | 590 | | | 143 | | | ST19 | | | 150 | | | -75 | | | 2011-08-08 | | | 2011-08-10 | |
SAR11-58 | 485222 | 7378369 | 646 | 311 | ST1 | 44 | -49 | 2011-08-10 |
| 2011-08-13 | |
| SAR11-59 | | | 489119 | | | 7370340 | | | 590 | | | 198 | | | ST19 | | | 0 | | | -90 | | | 2011-08-10 | | | 2011-08-11 | |
SAR11-60 | 489119 | 7370340 | 590 | 217 | ST19 | 15 | -82 | 2011-08-11 |
| 2011-08-14 | |
| SAR11-61 | | | 489320 | | | 7370398 | | | 589 | | | 238 | | | ST19 | | | 224 | | | -50 | | | 2011-08-14 | | | 2011-08-15 | |
SAR11-62 | 485252 | 7378419 | 646 | 166 | ST1 | 130 | -75 | 2011-08-13 |
| 2011-08-15 | |
| SAR11-63 | | | 489012 | | | 7370290 | | | 524 | | | 210 | | | ST19 | | | 10 | | | -50 | | | 2011-08-15 | | | 2011-08-17 | |
SAR11-64 | 485361 | 7378381 | 687 | 229 | ST1 | 315 | -63 | 2011-08-15 |
| 2011-08-18 | |
| SAR11-65 | | | 488101 | | | 7370498 | | | 553 | | | 299 | | | ST19 | | | 215 | | | -80 | | | 2011-08-18 | | | 2011-08-20 | |
SAR11-66 | 485322 | 7378452 | 647 | 174 | ST1 | 225 | -85 | 2011-08-17 |
| 2011-08-20 | |
| SAR11-67 | | | 488008 | | | 7370552 | | | 556 | | | 232 | | | ST19 | | | 250 | | | -75 | | | 2011-08-20 | | | 2011-08-22 | |
SAR11-68 | 485568 | 7378397 | 677 | 366 | ST1 | 310 | -50 | 2011-08-20 |
| 2011-08-25 | |
| SAR11-68A | | | 485568 | | | 7378397 | | | 677 | | | 18 | | | ST1 | | | 310 | | | -45 | | | 2011-08-20 | | | 2011-08-20 | |
SAR11-69 | 484980 | 7378285 | 550 | 372 | ST1 | 179 | -54 | 2011-08-22 |
| 2011-08-25 | |
| SAR11-70 | | | 485044 | | | 7377993 | | | 626 | | | 314 | | | ST1 | | | 310 | | | -73 | | | 2011-08-25 | | | 2011-08-29 | |
SAR11-71 | 485377 | 7378547 | 611 | 214 | ST1 | 57 | -80 | 2011-08-26 |
| 2011-08-28 | |
| SAR12-01 | | | 485302 | | | 7378540 | | | 604 | | | 152 | | | ST1 | | | 130 | | | -75 | | | 2012-05-16 | | | 2012-05-18 | |
SAR12-02 | 484928 | 7378187 | 543 | 387 | ST1 | 110 | -64 | 2012-05-16 |
| 2012-05-20 | |
| SAR12-03 | | | 485302 | | | 7378540 | | | 604 | | | 196 | | | ST1 | | | 130 | | | -77 | | | 2012-05-18 | | | 2012-05-20 | |
SAR12-04 | 485349 | 7378546 | 610 | 226 | ST1 | 120 | -82 | 2012-05-20 |
| 2012-05-23 | |
| SAR12-05 | | | 484928 | | | 7378187 | | | 543 | | | 454 | | | ST1 | | | 130 | | | -73 | | | 2012-05-20 | | | 2012-05-25 | |
SAR12-06 | 485336 | 7378297 | 695 | 327 | ST1l | 315 | -54 | 2012-05-23 |
| 2012-05-28 | |
| SAR12-07 | | | 485097 | | | 7378143 | | | 631 | | | 421 | | | ST1 | | | 310 | | | -84 | | | 2012-05-25 | | | 2012-05-30 | |
SAR12-08 | 487023 | 7379612 | 697 | 193 | ST1 | 320 | -55 |
|
|
|
|
| |
| SAR12-09 | | | 492181 | | | 7375013 | | | 594 | | | 165 | | | ST24 | | | 45 | | | -55 | | | | |
SAR12-10 | 486134 | 7378919 | 672 | 226 | ST1 | 320 | -45 |
|
|
|
|
| |
| SAR12-11 | | | 492391 | | | 7375380 | | | 667 | | | 175 | | | ST24 | | | 270 | | | -85 | | | | |
SAR12-12 | 485494 | 7378555 | 619 | 259 | ST1 | 310 | -58 | 2012-06-03 |
| 2012-06-07 | |
| SAR12-13 | | | 492062 | | | 7375528 | | | 590 | | | 186 | | | ST24 | | | 90 | | | -50 | | | | |
| SAR12-14 | | 491664 | 7375421 | 516 | 210 | ST24 | 100 | -60 |
|
|
|
|
| |
| SAR12-15 | | | 486577 | | | 7378897 | | | 686 | | | 314 | | | ST40 | | | 320 | | | -45 | | | | |
SAR12-16 | 484928 | 7378187 | 543 | 122 | ST1 | 320 | -60 | 2012-06-08 |
| 2012-06-09 | |
| SAR12-17 | | | 484928 | | | 7378187 | | | 543 | | | 181 | | | ST1 | | | 0 | | | -90 | | | 2012-06-09 | | | 2012-06-11 | |
SAR12-18 | 486496 | 7378999 | 684 | 284 | ST40 | 320 | -45 |
|
|
|
|
| |
| SAR12-19 | | | 486379 | | | 7379178 | | | 682 | | | 229 | | | ST1 | | | 145 | | | -49 | | | | |
SAR12-20 | 485243 | 7378304 | 658 | 281 | ST1 | 315 | -55 | 2012-06-21 |
| 2012-06-24 | |
Hole ID | | Easting | | | Northing | | | Elevation | | | Depth | | Target | Azimuth | Dip | Start Date | End Date |
(m) | (m) | (m) | (m) |
| SAR12-21 | | | 485226 | | | 7378335 | | | 657 | | | 201 | | | ST1 | | | 315 | | | -45 | | | 2012-06-24 | | | 2012-06-26 | |
SAR12-22 | 485006 | 7378343 | 556 | 351 | ST1 | 135 | -55 | 2012-06-26 |
| 2012-06-29 |
|
| SAR12-23 | | | 485385 | | | 7378386 | | | 686 | | | 21 | | | ST1 | | | 315 | | | -45 | | | |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 72 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
SAR23-01 | 485096 | 7378071 | 629 | 306 | ST1 | 315 | -45 | 2023-07-05 |
| 2023-07-14 |
|
| SAR23-02 | | | 485097 | | | 7378070 | | | 629 | | | 453 | | | ST1 | | | 315 | | | -60 | | | 2023-07-14 | | | 2023-07-21 | |
SAR23-03 | 485138 | 7378162 | 640 | 375 | ST1 | 315 | -56 | 2023-07-21 |
| 2023-07-26 |
|
| SAR23-04 | | | 485250 | | | 7378208 | | | 651 | | | 354 | | | ST1 | | | 315 | | | -60 | | | 2023-07-26 | | | 2023-07-31 | |
SAR23-05 | 485123 | 7378290 | 642 | 222 | ST1 | 315 | -45 | 2023-07-31 |
| 2023-08-02 |
|
| SAR23-06 | | | 485162 | | | 7378328 | | | 646 | | | 226 | | | ST1 | | | 315 | | | -45 | | | 2023-08-03 | | | 2023-08-05 | |
SAR23-07 | 485163 | 7378327 | 646 | 285 | ST1 | 315 | -65 | 2023-08-05 |
| 2023-08-08 |
|
| SAR23-08 | | | 485323 | | | 7378453 | | | 647 | | | 27 | | | ST1 | | | 315 | | | -45 | | | 2023-08-08 | | | 2023-08-14 | |
SAR23-09 | 485348 | 7378375 | 687 | 327 | ST1 | 315 | -62 | 2023-08-11 |
| 2023-08-15 |
|
| SAR23-10 | | | 485347 | | | 7378375 | | | 687 | | | 289 | | | ST1 | | | 315 | | | -45 | | | 2023-08-15 | | | 2023-08-19 | |
SAR23-11 | 485324 | 7378453 | 648 | 45 | ST1 | 315 | -60 | 2023-08-19 |
| 2023-08-21 |
|
| SAR23-12 | | | 485452 | | | 7378430 | | | 668 | | | 282 | | | ST1 | | | 315 | | | -60 | | | 2023-08-21 | | | 2023-08-25 | |
SAR23-13 | 485452 | 7378430 | 667 | 141 | ST1 | 315 | -45 | 2023-08-25 |
| 2023-08-27 |
|
| SAR23-14 | | | 485455 | | | 7378465 | | | 662 | | | 288 | | | ST1 | | | 315 | | | -56 | | | 2023-08-28 | | | 2023-09-03 | |
SAR23-15 | 485454 | 7378465 | 662 | 279 | ST1 | 315 | -46 | 2023-09-03 |
| 2023-09-06 |
|
| SAR23-16 | | | 486498 | | | 7378916 | | | 687 | | | 324 | | | ST40 | | | 315 | | | -45 | | | 2023-09-06 | | | 2023-09-13 | |
SAR23-17 | 486573 | 7378998 | 684 | 54 | ST40 | 315 | -45 | 2023-09-14 |
| 2023-09-16 |
|
| SAR23-18 | | | 485301 | | | 7378541 | | | 604 | | | 141 | | | ST1 | | | 315 | | | -46 | | | 2023-09-16 | | | 2023-09-18 | |
SAR23-19 | 485172 | 7378482 | 586 | 189 | ST1 | 135 | -55 | 2023-09-18 |
| 2023-09-20 |
|
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 73 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Figure 7-21 Drillhole Locations on the Sarfartoq Project
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 74 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
7.4.2 ST40 Drill Results
The ST40 target was drilled in 2009, 2010, and 2011. A 10.33 meter wide zone of REE mineralization identified in hole SARO9-03 was targeted with numerous drill holes in 2010 and 2011 to test the zone’s dip and strike (Figure 7-22). The zone was determined to have an east/west strike and a steep dip. The longest intersection encountered was 22 m in hole SAR11-02 and though none of the carbonatite encountered here in 2012 assayed up to expectations, the amount of neodymium relative to TREO remained high at 40 to 50 percent. It is this abnormally high Nd/TREO ratio that commands attention; and continued drill testing is warranted. Careful drill targeting should be supported by detailed geologic mapping, soil and rock chip geochemistry, and geophysics.
Figure 7-22 Drillhole Locations at the ST40 Zone
7.4.3 ST1 Drill Results
Since 2009, ST1 has been drilled with 102 holes totaling approximately 24,800 m, most aimed at delineating the resource. A steeply incised valley with an intermittent stream characterizes this area. Most holes were collared from the valley floor or the top of the plateau overlooking the valley and drilled NW or SE, with the aim of cross cutting the carbonatite dike swarm at regular intervals (Figure 7-15 and Figure 7-23).
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 75 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Figure 7-23 Drillhole Locations at the ST1 Zone
Most holes intersected zones of ferrocarbonatite emplaced into altered granite and granodiorite gneisses with amphibolite horizons and dolerite dikes. The alteration is weak to pervasive and consists of hematitization and dolomitization of the gneisses. There are numerous centimeter wide fine-grained carbonatite dikes and intrusive breccias. Within the altered rocks, stringers of Fe-carbonates and multidirectional veins of Fe-carbonates with barite and masses of calcite and hematite are present. The REE mineralization is associated with bodies of coarse-grained ferrocarbonatite that contain a wide variety of different minerals.
These bodies have sharp contact with the altered rocks and are locally intruded by light grey-beige carbonatite dikes establishing a sequence of events, the ferrocarbonates being older than the finer grained carbonatite dikes. Petrographic determination has identified this rock as a ferrodolomite-ankerite (+siderite) ferrocarbonatite (LeCouteur, 2009). It contains ferrodolomite, ankerite, siderite, barite and dark red masses. The masses are dominantly composed of hematite and calcite hosting fine-grained REE minerals, notably bastnäsite, synchysite, and monazite (Le Couteur, 2009). The masses exhibit internal zonation and could be of hydrothermal origin. They commonly have a coarse-grained hexagonal habit, indicating they might be pseudomorphs, perhaps of primary burbankite. Pyrite is disseminated in the carbonatite material. Sphalerite, galena and fluorite are locally observed.
The 2023 drilling program was successful in upgrading much of the resource from the inferred category to the indicated category. A second phase of drilling designed to expand the resource has yet to be carried out.
Drill hole SAR23-16 was designed to follow up on positive results from 2012 drilling to the northeast of ST1. This area might be an extension of ST1 mineralization; and might also host the intersection of structures hosting mineralization at ST1 and ST40. Many of the mineralized intercepts in this ST1-ST40 corridor host significantly higher TREO, NdPr, and Nb grades than commonly observed at ST1 (Figure 7-24;
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 76 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Table 7-4; Table 7-5). A chondrite normalized plot of several significant intercepts from SAR23-16 and the ST1 resource at cut off grades of 0.6 and 2.0% TREO illustrates the elevated NdPr at the ST1-ST40 corridor but also
indicates that the significantly higher grades in this area are also due to a lack of La and Ce depletion typical of ST1 mineralization.
Figure 7-24 Chondrite Normalized REE Distribution of the ST1 Resource and SAR23-16 Intercepts
Continued drilling at ST1 is strongly recommended, with a focus on expanding the resource to the southern boundary of the license, to the west, across the valley, and to the northeast to test potential continuations to the ST31 and ST40 areas.
7.4.4 ST19 Drill Results
The ST19 prospect was drilled in 2009, 2010, and 2011 (Figure 7-25).
Hole SAR10-22 was collared on top of a high, narrow ridge cutting between a set of deep parallel gorges. Prospecting here in 2010 identified numerous carbonatite veins hosted by fenetized granitic gneiss. The veins ran in various directions and dips in a zone thought to be approximately 25 m wide at surface. Aiming for this zone at depth the drill encountered ferrocarbonatite mineralization at the 60 meter mark and continued in the zone until the 120 m mark. Numerous broken, fractured zones were encountered throughout the hole. The zone averaged 2.6% TREO over 60 m and included a 12 m zone averaging 4.0% TREO.
Hole SAR10-23 was drilled from a set up approximately 75 meter east of SAR10-22. It was designed to intersect the zone discovered in hole SAR10-22 from the opposite direction. The hole intersected ferrocarbonatite mineralization from 43 m to 93 m but the zone here was diluted by several small sections of fenetized granitic gneiss and crackle breccias. Again, the drill had problems with zones of broken, fractured rock. The hole, however, returned higher than expected REE averages. The hole averaged 2.2%TREO over 60 m including a 14 m section that averaged 4.9%TREO.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 77 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
These holes were followed up in 2011 to test the potential size of the body and though hole SAR11-57 returned 60 m grading 2.58% TREO, it is thought the drill ran down dip. It is now thought the body is smaller than originally anticipated and no further drilling is planned.
Figure 7-25 Drillhole Locations at the ST19 Zone
7.4.5 Other Drill Results
The ST31 target was drilled in 2011 (Figure 7-26). Three holes targeted weak radiometric and rock chip anomalies. It was also thought this area might host an extension of mineralization from ST1. Unfortunately, very little carbonatite was encountered; and core sampling identified no significant REE mineralization with a maximum TREO assay of 0.36% over 2 m. Few carbonatites were mapped in the area during 2023; and rock chip samples contain <0.3% TREO. Thorium radiometric and REE in soil anomalies at this target are predominantly hosted in colluvium and glacial till, though there are some radiometric and soil anomalies hosted in bedrock. A REE in soil anomaly hosted in granite gneiss overlies the projection of SAR11-09 and SAR11-11. Ground Th anomalies extend from near these drill collars for about 500 m to the NW. The larger anomalies hosted in glacial sediments and colluvium likely have a local source to the north. These anomalies warrant further drill testing, but the prospect is considered weakly mineralized and low priority, at this time.
The most surprising result of 2011 came out of hole SAR11-50, located a few hundred meters northeast of the ST1 zone. This area, as ST1 N or the ST1 to ST40 Corridor, lies between ST1 and ST40, and might host an intersection of ST1 and ST40 structures. Targeting a linear low mag feature, SAR11-50 intersected carbonatite just past the 200 meter mark that assayed 3.26% TREO over 14 m including a surprising 7.15% over 4 m. Follow up drilling in 2012 and 2023 intercepted abundant carbonatite (up to 54 m of 2.11% TREO) with impressive grades (up to 9.27% TREO over 1.2 m (Table 7-4 and Figure 7-25). The highest NdPr results (up to 1.59% Nd2O3 + Pr2O3) from the property were intercepted here. These encouraging results indicate there is potential to not only expand the ST1 resource to the NE, but to improve the grade of the deposit in terms of TREO and Nd2O3 + Pr2O3.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 78 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Figure 7-26 1 Drillhole Locations on the ST31 Zone
7.5 Bulk Sampling
In 2011, a 7-tonne bulk sample of carbonatite was collected from surface at the ST1 zone and sent to SRC Laboratories in Saskatoon, Canada for assay. It was collected by hand using picks and shovels and was comprised of in-situ outcrop. It was placed in bulk bags which were closed and fitted with security seal to prevent tampering. The results proved to be extremely good. The entire sample averaged 2.36% TREO and 20.9% neodymium (of TREO). This bulk sample was used for metallurgical testing from 2011 to 2013 at Hazen, SRC, and SGS.
7.5.1 Sampling Method and Approach
The 2011 bulk sample was collected from the ST1 zone at a large known surface showing. The material was in-situ and was freed using picks and shovels
Rock chip samples were routinely collected by hand during the 2024 geologic mapping program. These samples were submitted to Activation Laboratories for analysis. Sampling focused on carbonatite, but some wall rock samples were collected as well.
Soil samples were collected during the 2023 and 2024 programs with pick and shovel. The 2023 soil grid at ST1 included 180 samples at a 100x50 meter spacing. The 2024 soil grid was designed to cover the entire license at a spacing of 100x200 m. Sampling in 2024 brought the total number of soil samples collected to 1,114 and extended coverage over the main drill targets north of Arnangarnup Qoorua.
Soil Sampling Method:
1. Sample sites were located via handheld GPS. Sites were cancelled or moved if the planned site was determined to be in recent sediments such as alluvium or till, if the site was on outcrop, or if the site was saturated with water.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 79 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
2. The soil pits were hand dug, with steel tools, to various depths from 25 to 90cm. Samples were ideally collected from the C horizon, though most samples were collected from the B horizon due to thickness of the B horizon.
3. Data collected from each site includes a simplified textural description, color, horizon, moisture, and gamma radiation dose measured in µR/h.
4. Approximately ½ to 1 kilogram of soil was placed in a sample bag and returned to camp.
5. The soils were dried in a heated tent, over the course of a few days.
6. Dried samples were sieved to -80 mesh (180µm) and analyzed with a Niton XL5 Plus before being submitted to ALS Chemex in 2023 or Activation Laboratories in 2024.
For core logging, Microsoft Excel spreadsheets were used to record sample intervals, geology and other parameters. It is recommended to change to a purpose-built drill database to ensure data integrity.
Historic sampling methods can be found in Giovenazzo (2010) and Druecker & Simpson (2011, 2012, & 2012). In 2023, sample intervals were marked on the core by the logging geologist. An electro-hydraulic core splitter was used to split the core into two pieces, with one-half put back in the core box and the other half sent for analysis. Duplicate samples were collected by splitting the archive half core into quarter core, so that the primary sample is composed of half core, the duplicate sample is composed of quarter core, and the archive is composed of quarter core. Metallurgical samples were collected in the same way as duplicate samples. Paper sample tags matching those inserted into sample bags were left in the boxes. A hardcopy archive of sample books is stored onsite.
In general, the core had extremely good recovery. Overall recovery was just over 95%, though median recovery was >99.5% and the mode was 100%. Overall recovery did not approach 100%, because the top part of most holes cut through unconsolidated soil and glacial sediments with near zero recovery.
Quality Assurance/ Quality Control samples (controls) for the 2023 drill program at Sarfartoq consist of 51 Standards (SARF-1 Certified Reference Material), 51 Duplicates (1/4 core field duplicates), 52 Blanks (Quartz Vein material), and 102 Check Analyses, including 5 Standards, 7 Duplicates, and 5 Blanks.
In 2023, 52 blanks, 51 standards and 51 duplicates were inserted at regular intervals when preparing the split drill core samples. One set of controls was inserted about every 40 samples, amounting to 151 controls over 2019 total samples, or 7.5%. The blanks were composed of local quartz vein material which is un-mineralized with respect to REE. The standards, designated SARF-1, were produced from ST1 carbonatite. The analytical results were reviewed and assessed using the blanks, the standards and the duplicates.
The drill core archive is stored on site. Core drilled in 2009 and 2010 is stored at an old core logging site at ST40. This archive fell into disrepair and there are no legible box labels nor sample tags remaining. Core drilled in 2011, 2012, and 2023 is stored at the current Neo Camp logging facility. Much of the 2011 and 2012 core was also found to be lacking legible box labels and sample tags. The boxes were identified and relabeled, but much of the archive was consumed for metallurgical testing.
7.5.2 Sample Interval
The nominal sample interval for drill core was two meters, but actual intervals were adjusted to match geological contacts, mineralogical variations, alteration zones, and zones of carbonatite dike emplacement.
7.5.3 Chain of Custody
Drill core was emptied from the innertube directly into wooden core boxes by drill contractors, at the drill. The core boxes were covered (wooden top) and bound with strong fiber tape, then transported by helicopter to the core
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 80 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
shack at the Company’s secure project campsite. At the core shack, the drill core was logged, labeled, marked for sampling, and photographed by NNSR geologists.
Recovery, RQD, geologic logging observations (lithology, alteration, mineralization, structures), sample numbers, intervals, gamma ray scintillometer/spectrometer readings, pXRF analyses, and magnetic susceptibility measurements were recorded and entered into digital forms. The drill core was then split in half with an electro-hydraulic core splitter. One half of the core was placed in sample bags, labeled, marked with a unique in-sequence sample ID number, and sealed.
Soil and rock chip samples were brought to Neo Camp by those who collected them and held in the logging facility until shipment.
Sample bags were then placed in super sacks that were taken via helicopter to the Kangerlussuaq airport. All drill samples and the 2023 soil samples were held in a shipping warehouse in Kangerlussuaq until loaded on a ship and sailed to Denmark. These samples were then carried by truck to ALS in Sweden, for preparation. The prepared pulps were air freighted to ALS Ireland for analysis. Rock chip and soil samples collected in 2024 were shipped via air cargo from Kangerlussuaq to Copenhagen, Denmark, then to Activation Laboratories in Ancaster, Ontario, Canada. All sampling information was recorded in hardcopy sample ticket books and transcribed into digital spreadsheets. Drill sample information is duplicated in digital log forms as well. Hardcopy sample ticket books are stored onsite, at the Neo Camp office.
From the moment all samples were collected from the field, until they left camp via helicopter, the samples were in possession of NNSR personnel. After leaving camp, the helicopter traveled directly to the Air Greenland helicopter hangar at the Kangerlussuaq international airport, which is a secured facility. Passengers are not allowed during slings, so NNSR personnel could only accompany internal shipments of samples to the airport. Only personnel with airport security clearance were allowed contact with the samples between the airport and shipping warehouses.
NNSR used ALS as the primary analytical laboratory in 2023. Activation laboratories were the secondary lab in 2023 and the primary lab in 2024. Both labs are corporately accredited to ISO 9001A:2000.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 81 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
8.0 SAMPLE PREPARATION, ANALYSES, AND SECURITY
The primary laboratories used for analytical work in 2023 and 2024 were ALS and Activation Laboratories in Ancaster, Ontario. All drill core was prepared and analyzed by ALS in 2023, with check analyses performed at Actlabs. ALS analyzed the 2023 soil samples. The 2024 soil samples and rock chip samples were analyzed at Actlabs.
8.1 Sample Preparation
Preparation of drill core and rock chip samples for analytical work was not performed by NNSR. Once drill core samples were split and put into sample bags, no other sample preparation steps were conducted by employees, consultants, officers, directors, or associates of the Company. Sample security was more than adequate at the remote project site.
Soil samples were dried and sieved to -80 mesh on site, by NNSR personnel. At ALS the drill core samples were crushed to 70% passing 2 mm or better, which is a standard preparation procedure for samples where a representative split was pulverized. The sample was then split using a riffle splitter and pulverized to 85% passing 75 micron or better.
8.2 Laboratory Method
The 2023 drill core samples were analyzed using the ME-MS81d analytical package, which is a combination of REE and trace element analysis by ME-MS81 plus major oxides by ME-ICP06. The ME-MS81h package was used for overlimit REE. The ME-OGREE analysis was used for ME-MS-81h overlimits on Ce and Pr. The ME-XRF15c method was used for Nb overlimits. A lithium borate fusion of the sample is conducted prior to acid dissolution and ICP-MS analysis. This technique solubilizes most mineral species, including those that are highly refractory. Core samples drilled from 2009 2012 were analyzed using the ME-MS81h and ME-MS61 packages.
From the 2023 drill samples, 102 pulp splits from ALS were sent to Actlabs Ancaster, Ontario where they were analysed using the 8-REE package. This package uses a lithium metaborate/tetraborate fusion with analysis by ICP-OES and ICP-MS. The package provides results for the full REE suite as well as trace elements and major oxides.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 82 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
9.0 DATA VERIFICATION
Jason Felsman is the lead author of this revision of the Sarfartoq REE Technical Report. He was the Project manager during 2023 and 2024; and was on site to oversee the drilling, mapping, soil sampling, and geophysical surveys. He personally examined the geology of the license area, the data produced from each of the programs, and drill core. He observed and directed NNSR personnel in preparing and shipping drill samples. He also received all 2023 and 2024 analytical certificates from the labs, evaluated them, and finds everything to be in order.
Quality Assurance/ Quality Control samples (controls) for the 2023 drill program at Sarfartoq consist of 51 Standards (SARF-1 Certified Reference Material), 51 Duplicates (1/4 core field duplicates), 52 Blanks (Quartz Vein material), and 102 Check Analyses, including 5 Standards, 7 Duplicates, and 5 Blanks.
The quartz vein Blank material was confirmed to contain 2 to 3 orders of magnitude lower REE concentrations than mineralized carbonatite from the ST-1 resource area, which includes the collection site for the SARF-1 CRM. No instances of apparent contamination were flagged.
The only Certified Reference Material (CRM or Standard) used in the 2023 drill program was the SARF-1 CRM. This CRM was prepared by CDN Resource Laboratories Ltd. (CDN) in Langley, BC, from material collected from a mineralized carbonatite in the ST-1 resource area. The CRM was certified by Smee & Associate Consulting Ltd. (Druecker, 2011). Though numerous individual results from ALS fell outside of two standard deviations from the certified values, the mean values of ALS results fell within two standard deviations. Also, all ALS results had less than 20% variance from the certified values and variances of more than 10% are rare, except for Th. Actlabs outperformed ALS in terms of accuracy, but the data from both labs is acceptable.
Filed duplicates analyzed at ALS demonstrate good correlation and duplicate pair variance was generally good. Individual duplicate pair variance could be significant, but this is most certainly due to heterogeneous mineralization at the drill core scale.
Check analyses between the two labs show good correlation, especially in the more abundant REE, which are the elements of interest at Sarfartoq. Excluding the Blanks, variance was less than 20% for all check samples, including CRMs.
Overall, evaluation of the control samples indicates the results from ALS are acceptable. Further investigation is warranted regarding Th results and minor, but systematic overestimation of REE grades at ALS.
9.1 Standards
For the initial exploration drilling conducted in 2009, seventeen NRCan OKA-2 standards were used. This standard had very high concentrations of La, Ce, and Nd; and was not an ideal standard for the Sarfartoq REE mineralization.
In 2010, Hudson commissioned an REE standard to be created from Sarfartoq ST1 Zone material. The standard was prepared by CDN Resource Laboratories Ltd. (CDN) in Langley, BC. CDN prepared a homogeneous pulp from ST1 material and 60 samples of 30g each were split and sent out for round-robin analysis to six independent laboratories. Results were then certified by Smee & Associates Consulting Ltd as presented in Table 9-1.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 83 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Table 9-1 Analysis of Certified Standards vs Standards Submitted into Drill Program
The certified values for the SARF-1 CRM are presented in Table 9-2.
In 2011, a total of 279 blanks, 279 standards and 279 duplicates were inserted at regular intervals when preparing the 7000+ split drill core samples (approx. one standard per 25 samples). The analytical results were reviewed and assessed using the blanks, the standards and the duplicates. A similar frequency was used in 2009 and 2010. In general, the mean results fall within two standard deviations of the certified standard and demonstrate the veracity of the drill results.
A total of 51 SARF-1 CRMs were submitted to ALS, in 2023. Five of these were to be submitted to Actlabs as check samples, but the entirety of each sachet of CRM was consumed at ALS. New sachets of reference material were submitted to Actlabs. Every CRM submitted to both labs was SARF-1.
Of the 51 SARF-1 CRMs analyzed at ALS, numerous results fell more than 2 standard deviations from the certified values: 9 for La, 2 for Ce, 8 for Pr, 7 for Sm, 10 for Eu, 3 for Dy, and 37 for Th. All Nd results were within two standard deviations of the certified value. Overall, the mean results from ALS fall within 2 standard deviations of the certified values for the REE, but the mean of Th results does not. No ALS results had more than 20% variance from the certified value. Variances of more than 10% are rare for REE, including only 1 failure for Ce, 2 for Pr, and 3 for Dy, but Th variances exceed 10% in 35 of the 51 analyses. A summary of the ALS results is presented in Table 9-3.
Of the 5 SARF-1 CRMs analyzed at Actlabs, two had results falling more than 2 standard deviations from the certified values (Table 9-4). One CRM had failures for Sm, Eu, and Dy. The other only had Dy concentration falling more than 2 standard deviations from the certified value. All other results were within 2 standard deviations of the certified values. Overall, the mean values of La to Eu, Dy, and Th results from Actlabs all fall within 2 standard deviations of the certified values. No Actlabs result had more than a 20% variance from the certified value. Variances greater than 10% include only one result for Nd and one for Dy.
Though Actlabs significantly outperformed ALS in terms of accuracy in analyzing the SARF-1 CRM, the small sample size and generally good correlation between the labs indicates no significant issues with either lab, for REE. Also, there are no significant issues apparent, regarding the 2023 drill data. These conclusions should be corroborated by an experienced geochemist before publicly reporting any drill data or resource estimates based on the 2023 drilling. Also, the significant fail rate for Th at ALS warrants additional investigation.
Table 9-2 Certified Values for the SAFR-1 CRM
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
Analyte | | Fusion | | | Fusion | | | Fusion | | | Fusion | | | Fusion | | | Fusion | | | Fusion | | | Fusion | |
La | Ce | Pr | Nd | Sm | Eu | Dy | Th |
Certified Mean | 2665 | 6768 | 746 | 2615 | 235 | 50.9 | 25.5 |
|
|
|
| 442 |
|
| TWO Standard | | 196 | 572 | 62 | 272 | 16 | 2.8 | 2.2 | 46 |
Deviations (ppm) |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 84 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Table 9-3 ALS Results for SARF-1 CRM
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| ALS | | | La | | | Ce | | | Pr | | | Nd | | | Sm | | Eu | | | Gd | | | Tb | | Dy | |
MAXUMUM (ppm) | 2950 | 7280 | 852 | 2720 | 258 | 56.4 | 118 | 9.51 | 27.7 |
|
| MINIMUM (ppm) | | | 2570 | | | 6120 | | | 712 | | | 2390 | | | 222 | | 46.9 | | | 93.7 | | | 6.66 | | 22.5 | |
MEAN (ppm) | 2764 | 6691 | 786 | 2581 | 242 | 51.4 | 103.4 | 8.55 | 24.9 |
|
| TWO STANDARD | | 196 | 461 | 52 | 162 | 16 | 4.0 | 9.6 | 1.12 | 2.0 |
DEVIATIONS |
| ALS | | | Ho | | | Er | | | Tm | | | Yb | | | Lu | | Y | | | Nb | | | Th | | U | |
MAXUMUM (ppm) | 2.63 | 4.56 | 0.43 | 2.18 | 0.27 | 56.4 | 666 | 546 | 11 |
MINIMUM (ppm) | 2.09 | 2.97 | 0.23 | 0.87 | 0.08 | 39.6 | 491 | 461 | 9.15 |
|
| MEAN (ppm) | | | 2.39 | | | 3.39 | | | 0.28 | | | 1.08 | | | 0.14 | | 46.0 | | | 588 | | | 498 | | 9.95 | |
TWO STANDARD DEVIATIONS | 0.23 | 0.53 | 0.06 | 0.37 | 0.06 | 4.5 | 65 | 33 | 0.81 |
|
Table 9-4 Actlabs Results for SARF-1 CRM
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Actlabs | | | La | | | Ce | | | Pr | | | Nd | | | Sm | | Eu | | | Gd | | | Tb | | Dy | |
MAXUMUM (ppm) | 2770 | 6900 | 753 | 2570 | 235 | 52.3 | 92.9 | 8.2 | 24.2 |
|
| MINIMUM (ppm) | | | 2600 | | | 6320 | | | 691 | | | 2360 | | | 216 | | 47.4 | | | 84.8 | | | 7.9 | | 22.8 | |
MEAN (ppm) | 2690 | 6640 | 723 | 2494 | 226 | 49.7 | 89.0 | 8.1 | 23.5 |
|
| TWO STANDARD | | 108 | 373 | 39 | 141 | 12 | 3.1 | 5.2 | 0.2 | 1.0 |
DEVIATIONS |
| Actlabs | | | Ho | | | Er | | | Tm | | | Yb | | | Lu | | Y | | | Nb | | | Th | | U | |
| MAXUMUM (ppm) | | | 2.3 | | | 3 | | | 0.26 | | | 1.4 | | | 0.18 | | 41 | | | 523 | | | 460 | | 10.4 | |
MINIMUM (ppm) | 2.2 | 2.8 | 0.25 | 1.3 | 0.17 | 40 | 490 | 445 | 9.3 |
|
| MEAN (ppm) | | | 2.2 | | | 2.9 | | | 0.26 | | | 1.4 | | | 0.17 | | 41 | | | 511 | | | 454 | | 9.8 | |
TWO STANDARD DEVIATIONS | 0.1 | 0.2 | 0.01 | 0.1 | 0.01 | 1 | 23 | 11 | 0.7 |
|
| MAXUMUM (ppm) | | | Ho | | | Er | | | Tm | | | Yb | | | Lu | | Y | | | Nb | | | Th | | U | |
9.2 Blanks
The 2009 2012 blanks consisted of local un-mineralized and unaltered granitic gneisses from the Garnet Lake area. The REE content was extremely low. Of the 277 blanks submitted in 2011, the mean REE content was 304 ppm (standard deviation of 284 ppm).
In 2023, a total of 52 blanks was inserted into drill core submittals to ALS, with 5 of the pulps being forwarded to Actlabs for check analysis. Both labs confirm strikingly low concentrations of REE in the blank material.
The blank material is composed of hand collected, milky quartz vein material, collected from a hill 425 m northwest of Neo Camp. The blank material is not certified, nor has this source been analyzed before, so the accuracy of the results cannot be evaluated. The precision of the results and variability of the source material are evaluated, here.
Results from both labs were two orders of magnitude lower than all the certified values (La to Eu, Dy, & Th) for SARF-1 certified reference material. Blank results were also two to three orders of magnitude lower than REE concentrations calculated for ST-1 resource modeling. The blank material used in 2023 should be considered
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 85 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
ideal for the Sarfartoq REE program, as the material is readily available at the Project site and consistently hosts low concentrations of REE, 2-3 orders of magnitude below concentrations found in mineralized carbonatite from the property.
It should be noted that the labs have significantly different lower limits of detection for the REE suite, hampering statistical analysis and comparison between the labs.
Blank results are summarized in Table 9-5 and Table 9-6.
Table 9-5 ALS Results for Blanks
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| ALS | | | La | | | Ce | | | Pr | | | Nd | | | Sm | | | Eu | | | Gd | | | Tb | | Dy |
MAXIMUM (ppm) | 50.6 | 82.9 | 7.75 | 26.4 | 2.56 | 0.65 | 1.52 | 0.21 | 1.58 |
MINIMUM (ppm) | 0.2 | 0.4 | 0.03 | 0.1 | 0.03 | 0.02 | 0.05 | 0.01 | 0.05 |
MEAN (ppm) | 4.7 | 9.9 | 1.06 | 3.4 | 0.39 | 0.12 | 0.27 | 0.03 | 0.16 |
| TWO STANDARD | | 18.0 | 33.8 | 3.51 | 10.8 | 1.00 | 0.27 | 0.63 | 0.08 | 0.59 |
DEVIATIONS |
| ALS | | | Ho | | | Er | | | Tm | | | Yb | | | Lu | | | Y | | | Nb | | | Th | | U |
MAXIMUM (ppm) | 0.32 | 0.95 | 0.14 | 0.83 | 0.08 | 9.7 | 13.95 | 11.6 | 1.3 |
MINIMUM (ppm) | 0.01 | 0.03 | 0.01 | 0.03 | 0.01 | 0.1 | 0.46 | 0.06 | 0.05 |
MEAN (ppm) | 0.03 | 0.08 | 0.02 | 0.10 | 0.02 | 0.43 | 2.47 | 1.25 | 0.13 |
TWO STANDARD DEVIATIONS | 0.11 | 0.37 | 0.07 | 0.42 | 0.05 | 2.67 | 5.19 | 3.99 | 0.50 |
Table 9-6 Actlabs Results for Blanks
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Actlabs | | | La | | | Ce | | | Pr* | | | Nd | | | Sm* | | | Eu** | | | Gd** | | | Tb** | Dy** | |
MAXIMUM (ppm) | 28.6 | 74.6 | 8.75 | 29.6 | 3.0 | 0.72 | 1.7 | 0.1 | 0.6 |
|
MINIMUM (PPM) | 0.3 | 0.9 | <0.05 | 0.4 | <0.1 | <0.05 | <0.1 | <0.1 | <0.1 |
MEAN (PPM) | 7.2 | 17.8 | 2.56 | 6.9 | 1.1 | NA | NA | NA | NA |
|
| TWO STANDARD | | 21.5 | 57.0 | 7.16 | 22.8 | 2.7 | NA | NA | NA | NA |
DEVIATIONS |
| Actlabs | | | Ho | | | Er | | | Tm | | | Yb | | | Lu | | | Y | | | Nb | | | Th | U** | |
MAXIMUM (ppm) | <0.1 | <0.1 | <0.05 | <0.1 | <0.04 | <2 | 13 | 7.6 | 0.2 |
MINIMUM (PPM) | <0.1 | <0.1 | <0.05 | <0.1 | <0.04 | <2 | 6 | 0.3 | <0.1 |
|
MEAN (PPM) | NA | NA | NA | NA | NA | NA | 9 | 1.9 | NA |
TWO STANDARD DEVIATIONS | NA | NA | NA | NA | NA | NA | 5 | 5.7 | NA |
|
Note: *Statistics are calculated only on results above detection. **Only one sample had a detectible concentration.
9.3 Field Duplicates
Duplicates were collected at the same frequency as both standards and blanks. For each of the 277 designated duplicate samples collected in 2011, the split core was re-split into quarters and both quarters were sent to the lab. From the duplicate quarter, one field duplicate and two laboratory duplicates (split and pulp) were obtained. At both Actlabs and ALS the field duplicates demonstrated good correlation (R2 = 0.91 and 0.94) considering the
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 86 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
heterogeneity of the sample material (Figure 9-1). Lab duplicates also demonstrated excellent correlation for prep duplicates and pulp duplicates (R2 = 0.992 and 0.998 for Actlabs and 0.986 and 0.961 for ALS) as can be seen in Figure 9-2 and Figure 9-3.
6.00% Duplicate: Sample vs Split
| | | | | | | | | | | | | | | | | | | | | | | |
|
|
|
|
| oa |
|
|
|
|
|
|
|
|
|
|
|
|
|
| ActLabs | : R² = 0.9067 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| oa | e |
|
| we |
|
|
|
|
|
| ActLabs |
|
|
|
|
|
a! ALS: R? =( | 1.93897 |e |
| ALS |
|
|
|
|
5.00%
4.00%
E
3.00%
3 2
2.00%
1.00%
0.00% Ya
0.00% 1.00% 2.00% 3.00% 4.00% 5.00%
Sample Assay (TREO %)
Figure 9-1 REE Field Sample Verification (Duplicates)
Duplicate: Sample vs Prep
5.00%
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 87 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
| | | | | | | | | | | | | | | | | | | | |
|
|
|
|
|
|
|
|
|
|
|
| vA |
| ActLabs: R | ² = 0.99146 |
|
|
| SA |
|
|
|
|
| 2 |
|
|
ALS: R² = | 0.98614 |
| A | ctLabs |
| Vv |
ley | _ |
| A | LS |
|
ar |
|
|
|
|
|
|
7 —_ |
|
|
|
|
|
|
4.50%
4.00%
3.50%
7 3.00%
E
2.50%
$
2 3 2.00%
&
1.50%
1.00%
0.50% 0.00% Z
0.00% 1.00% 2.00% 3.00% 4.00% 5.00%
Sample Assay (TREO %)
Figure 9-2 REE Lab Sample Verification (Prep Duplicates)
5.00% Duplicate: Sample vs Pulp
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 88 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ve |
|
|
|
| ActLabs: | R² = 0.99835 |
|
|
|
|
|
|
| 7 | |
|
|
|
|
| 7 | | 2 |
|
|
|
|
| ww |
|
|
|
|
|
| | yw IAS | ; R² = 0.96139 |
|
|
|
|
|
|
|
|
|
| yr |
|
|
|
|
| ActLabs ALS |
|
Pra |
|
|
|
|
|
|
|
|
|
4.50%
4.00%
3.50%
a 3.00%
72.50%
3
2
2.00%
é
1.50%
1.00%
0.50%
0.00% a
0.00% 1.00% 2.00% 3.00% 4.00% 5.00%
Sample Assay (TREO %)
Figure 9-3 REE Lab Sample Verification (Pulp Duplicates)
In 2023, a total of 51 duplicate samples were collected in the field. The primary samples were collected from BTW diameter drill core, by splitting the core in half, using an electrohydraulic splitter. One half of the core was submitted as a sample, and the other half was retained as archive material. Duplicate samples were collected by splitting the archive half of the drill core. So, for duplicated samples, there is a primary sample composed of ½ core, a duplicate sample composed of ¼ core, and an archive sample composed of ¼ core.
Results from ALS show good correlation between primary and duplicate samples. Some scatter in the variance is expected, due to heterogeneity in the mineralization at the drill core scale (cm). Results above detection limits are removed from the plots presented in Figure 9-4 to Figure 9-11.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 89 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 90 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 91 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Figure 9-9 Field Duplicates: Praseodymium Variance
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 92 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
9.4 Check Assays
In 2009, as part of the QA/QC program, Hudson Resources employed one check lab to which duplicate pulps were sent to confirm the primary lab accuracy. From this program, 18 pulps were sent to ACME Analytical in Vancouver.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 93 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Results show that the ALS Chemex lab was in most cases lower than ACME Lab for almost all of the REE. Some of these samples were rerun at ALS Chemex and yielded very similar results to the first run. Because the results from the first and the second run at ALS Chemex were very similar, the higher values from ACME were discounted. It is not known why there was a difference between labs in some of the samples.
In 2023, check analyses were performed on 102 samples, including 6 duplicates, 5 SARF-1 standards, and 5 quartz blanks. The primary lab was ALS and the secondary lab was Activation Laboratories.
Correlation of results is very good for La, Ce, Pr, Nd, and Y. These elements represent the bulk of the REE budget of Sarfartoq mineralization and the economic value of the potential resources on the license. The full suite of REE was evaluated by check analysis. Correlation becomes poorer with increasing atomic number and decreasing abundance. This is of little concern, as Sarfartoq is decidedly a LREE enriched system, and HREE are not likely to have any significant impact on project economics. Relative to Actlabs, ALS consistently overestimates REE concentrations, though by a small amount. This is most pronounced at high grades, where correlation between the labs decreases. This warrants further investigation, as lab selection could impact project economics.
Numerous results below detection limits were excluded from the plots in Figure 9-12 to Figure 9-20, as they would skew the statistics. In general, the excluded samples were Actlabs underlimits, as Actlabs generally has higher minimum detection limits than ALS. In many cases, the underlimit Actlabs results were from samples that were also reported as below detection at ALS. In every other case, ALS results confirm concentrations near the Actlabs detection limit. The samples most commonly reported as below detection with respect to REE were the blanks.
Blanks: Due to the abundance of REE results below detection, variance between the labs can only be evaluated in terms of La, Ce, Pr, and Nd. The variance averaged 64%, ranging from -62% to +400%. This is of no concern, as both labs confirm that the quartz blank material contains very low concentrations of REE (<150 ppm TREE).
Standards: Five SARF-1 standards were included in the check analysis program. The standard evaluation is not ideal, as ALS consumed all of the material during primary analysis, and new sachets of SARF-1 reference material were submitted to Actlabs. The data are valid for evaluating the labs and the reference material but cannot be considered true check analyses.
Drill Core: Variance from the ALS results in the complete REE suite ranged from -75% to +178% at Actlabs, averaging -2%. When only considering La, Ce, Pr, and Nd, variance ranged from -18% to +15%, with an average of -3%. Variance exceeds 10% in 7 cases for La, 6 for Ce, 26 for Pr, and 13 for Nd. Variance does not exceed 20% for any check analysis of drill core for La to Nd.
Thorium and U were also evaluated and results correlate very well between the two labs (Figure 9-22 and Figure 9-23). Four samples have Th reported as above detection by ALS. Results from Actlabs confirm that Th concentrations are near the ALS upper detection limit, in these 4 samples.
Niobium is a potentially economic element of interest at Sarfartoq and was also evaluated in the check analysis program (Figure 9-21). Results correlate very well between ALS and Actlabs. For ALS, ME-MS81h is preferred over ME-MS81, and ME-XRF15c is preferred over ME-MS-81h. For Actlabs, FUS-XRF is preferred over FUS-MS.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 94 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 95 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 96 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 97 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 98 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Figure 9-20 Check Analyses: Sm to Lu and Y
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 99 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 100 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
9.5 Core Recovery
Median core recovery was >99.5%, with a mode of 100%. Overall recovery was just over 95%, because most drill holes start with up to 10 m of near zero recovery in overburden and unconsolidated sediments. Overburden as thick as 27 m was observed at ST1, where core holes were oriented parallel to colluvium/ drift covered valley walls. A few drill holes encountered small zones of broken, fractured rock over one meter or less that dropped recovery slightly, but these sections were mostly in the fenetized granites and not the main carbonatite bodies.
9.6 Site Visits
The QP (R. Simpson) visited the Project from September 7-9, 2010. The purposes of the visit was to review the geology and mineralization encountered in the drill holes completed to date. Core logging, sample preparation, and QAQC procedures were also reviewed. Drill core from several holes was examined in and found to be consistent with drill logs. Sample intervals were correctly marked and identified. Drill core examined included sections of the following holes:
SAR09-06
SAR10-08
SAR10-16
SAR10-22
SAR10-25
SAR10-32
Three samples of core from two drill holes were collected and submitted to ACME Laboratories for analysis. Results for REE’s were consistent with the reported values of the intervals from which they were collected (Table 9-7).
Table 9-7 September 2010 Site Visit Check Sample Results
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
Sample | Dhole | Depth | La | Ce | Pr | Nd | Sm | Eu | Gd | Tb | Dy |
SAR-1 | SAR10-08 | 344.5 | 4443 | 15399 | 1859 | 7048 | 793.4 | 172.6 | 446.6 | 30.32 | 74.83 |
| Assay Interval | | 343-345 | | 1775 | | 6000 | | 880 | | 3120 | | 355 | | | | 78 | | | 287 | | 20.6 | | 35.4 | |
SAR-2 | SAR10-08 | 295.7 | 1566 | 6030 | 900.6 | 3611 | 397.3 | 75.84 | 160.8 | 9.69 | 25.6 |
| Assay Interval | | 295-297 | | 4350 | | 12350 | | 1635 | | 5680 | | 622 | | | | 150 | | | 488 | | 35.1 | | 67.5 | |
SAR-3 | SAR10-16 | 283.5 | 843.9 | 2048 | 257.7 | 900.2 | 113.6 | 29.7 | 75.14 | 5.58 | 13.26 |
| Assay Interval | | 282-284 | | 1535 | | 3890 | | 462 | | 1530 | | 190 | | | | 51.6 | | | 165 | | 12.7 | | 24.3 | |
Sample | Dhole | Depth | Ho | Er | Tm | Yb | Lu | Y | Nb | Ta | |
SAR-1 | SAR10-08 | 344.5 | 2.59 | 2.6 | 0.57 | 5.29 | 0.43 | 119.9 | 61.2 | <0.1 | |
| Assay Interval | | 343-345 | | 3.25 | | 15 | | 0.33 | | 2.7 | | 0.26 | | | | 55 | | | 28 | | <0.5 | | |
SAR-2 | SAR10-08 | 295.7 | 0.25 | 0.63 | 0.2 | 2.21 | 0.15 | 36.5 | 77.9 | 0.2 | |
| Assay Interval | | 295-297 | | 5.65 | | 26 | | 0.67 | | 4.1 | | 0.41 | | | | 108 | | | 60 | | <0.5 | | |
SAR-3 | SAR10-16 | 283.5 | 0.76 | 0.89 | 0.21 | 1.87 | 0.21 | 24.6 | 204.1 | 4.6 | |
| Assay Interval | | 282-284 | | 2.3 | | 7.5 | | 0.14 | | 2.1 | | 0.24 | | | | 39 | | | 55 | | 1.3 | | |
Seven drill hole collars were verified hand-held GPS readings.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 101 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
9.7 Database Verification
The database has been independently audited by the author for location accuracy, down hole survey errors, transcription errors, interval errors, and missing sample intervals. Lithologic and mineralization descriptions have been compared to drill core and found to be accurate.
9.8 Conclusions
Both ALS and Actlabs laboratories provided Hudson and NNSR with consistent quality assays over the history of the REE project and will continue to be used in the future. Results for the standards, blanks and duplicates are rarely incongruous and there have been no sample mix-ups or loss of samples.
The QP author has confirmed that the data has been generated with proper procedures, has been accurately transcribed from the original source and is suitable to be used in a Mineral Resource Estimate.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 102 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
10.0 MINERAL PROCESSING AND METALLURGICAL TESTING
The metallurgical test work completed on Sarfartoq mineralized material is presented in the following sections, presented from the most recent to the earliest program:
2026 SGS Mineral Beneficiation Test Work
2023 Mineralogical Characterization of Sarfartoq Samples
2019 SGS Scoping Rare Earth Leaching Test Work
Early Test Work
10.1 2026 SGS Mineral Beneficiation Test Work
Two sample lots were submitted to SGS for mineral beneficiation test work. The first lot comprised 110 kg of drill core material, from which three composites (ST1, ST40, and ST19) were prepared. The second lot comprised approximately 350 kg of drill core material collected from seven drill holes. A master composite was prepared from this material and used for the beneficiation test program.
10.1.1 Head Minerology
Head mineralogical characterization was conducted on the ST1, ST40, and Master Composite samples, as well as 15 variability samples, using TIMA-X, with selected samples further analyzed by electron probe micro-analysis (EPMA). The rare earth mineral assemblage comprised bastnaesite, synchysite/parisite, monazite, burbankite, ancylite, and kukharenkoite, with significant variability observed among both the composite and variability samples.
The mineralogical compositions of the composites differed considerably. While the ST1 Composite was dominated by burbankite, ancylite, bastnaesite, synchysite/parisite, and monazite, the Master Composite contained only trace amounts of burbankite and ancylite and was dominated by monazite and bastnaesite/synchysite/parisite. The principal gangue minerals identified were calcite, siderite, ankerite, and dolomite.
Liberation analysis indicated that burbankite was generally well liberated in the ST1 and ST40 composites, whereas most other rare earth minerals exhibited poor liberation at the coarser -106/+45 µm size fraction but showed substantially improved liberation at finer particle sizes (-45 µm). The degree of rare earth mineral liberation also varied significantly among the variability samples.
EPMA results showed considerable variation in the chemical composition and TREO content of the rare earth minerals. Monazite contained approximately 50-60% TREO, ancylite contained approximately 35-43% TREO, and burbankite contained approximately 15% TREO. Analysis of apatite in the Master Composite indicated only trace rare earth content (approximately 0.5% TREO), suggesting that apatite was not a significant host of REE.
10.1.2 Grindability Test
Three selected variability samples, SAR 11-17, SAR 11-19, and SAR 11-42, were submitted for Bond Ball Mill Work Index (BWi) grindability testing. The test results are summarized in Table 10-1. Samples SAR 11-17 and SAR 11- 42 exhibited similar grindability characteristics and were classified as moderately soft, whereas SAR 11-19 was classified as moderately hard.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 103 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Table 10-1 Bond Ball Mill Grindability Test Results
| | | | | | | | |
Sample ID | | Bond Ball Mill Work Index |
kWh/t |
SAR 11-17 12.8
SAR 11-19 16.1
SAR 11-42 13.2
10.1.3 Sorting Amenability Test Work
For the sorting amenability test work, radioactivity measurements were collected using a Syclone handheld gamma-ray spectrometer on three particle size fractions: +19 mm, -19 mm +5.6 mm, and -5.6 mm. Five variability samples, designated Var 1A, Var 6B, Var 7A, Var 8, and Var 10, were evaluated.
The test results indicated that Var 1A, Var 8, and Var 10 exhibited potential for sensor-based sorting based on their radiometric response, whereas Var 6B and Var 7A showed limited sorting potential under the conditions tested.
10.1.4 Magnetic Separation Test Work
Preliminary magnetic separation testing was conducted to evaluate the potential for concentrating rare earth (RE) minerals using a wet high-intensity magnetic separator (WHIMS). The sample was processed sequentially at magnetic field strengths of 1,000, 2,000, 5,000, and 10,000 Gauss. The test results indicated a limited amenability to magnetic separation and did not achieve significant upgrading or concentration of RE minerals in the samples evaluated.
10.1.5 Bench Scale Flotation Test Work
Batch flotation testing was conducted on four composite samples to evaluate flotation performance and optimize the flotation conditions. The program comprised 57 tests on the ST1 composite, 20 tests on the Master Composite, eight tests on the ST40 composite, and two tests on the ST19 composite. The impacts of different operating parameters in the flowsheet were evaluated, including primary grind size, collector and depressant type/dosage, pulp temperature, pulp density and pre-flotation strategies on rare earth mineral recovery and concentrate grade.
10.1.5.1 Evaluation of Collector Scheme
For ST1 composite, the collector optimization represented a key component of the flotation test program. Early tests using hydroxamate and fatty acid collectors produced either low concentrate grades or reduced recoveries. The REEC5 collector system demonstrated the best performance among the initial collector schemes; however, subsequent testing showed that a collector mixture of PAM200 and AM810 significantly improved flotation performance. Further optimization of collector dosage, conditioning pH, and collector ratios resulted in the most favourable results at a PAM200:AM810 ratio of 1:3 to 1:5, producing final cleaner concentrates grading approximately 19-20% TREO at recoveries of approximately 57-58%. These results established the PAM200- AM810 collector system as the preferred flotation reagent scheme for subsequent test work.
The preferred collector scheme was subsequently evaluated using the Master Composite sample. Baseline testing using the collector regime established during earlier optimization studies produced a 2nd cleaner concentrate grading approximately 10.7% TREO at 45% recovery. Subsequent increases in collector dosage and adjustments to pH control improved recovery to approximately 60% while maintaining a similar concentrate grade. WHIMS treatment of the cleaner concentrate did not provide additional upgrading or recovery benefits. Testing
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 104 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
also demonstrated that separate addition of PAM200 and AM810 collectors had little effect on flotation performance relative to the baseline reagent scheme. Higher collector dosages increased concentrate grade but resulted in lower recoveries. Alternative collectors, including Aero6493 and Florrea 7088, exhibited poor flotation performance, producing low concentrate grades and recoveries. Overall, the PAM200-AM810 collector system remained the preferred reagent scheme for the Master Composite sample.
10.1.5.2 Effect of Primary Grind Size
For ST1 composite, the effect of primary grind size on flotation performance was evaluated at P80 values ranging from approximately 27 µm to 81 µm. Results demonstrated that flotation performance improved with decreasing grind size, while the coarsest grind size (P80 of 81 µm) resulted in poor flotation response, likely due to insufficient liberation of rare earth minerals. The best performance was achieved at a primary grind size of P80of 27 µm, which produced a 2nd cleaner concentrate grading 17.8% TREO at 32.4% recovery. Based on these results, a primary grind size of P80 of 27 µm (P100 passing 38 µm) was selected for subsequent flotation test work.
For the master composite, the effect of primary grind size on flotation performance was evaluated at P100 values of 25 µm, 38 µm, and 53 µm. Results indicated that the coarsest grind size (P100 of 53 µm) produced the poorest flotation performance, yielding a 2nd cleaner concentrate grading 9.3% TREO at 32.7% recovery. Improved flotation performance was observed at finer grind sizes, with the best overall response achieved at P100 of 38 µm. Additional testing at P100 of 25 µm demonstrated that acceptable concentrate grades and recoveries could be obtained with optimized collector dosages, suggesting that the finer grind size may provide an appropriate balance between selectivity and recovery. However, further bench-scale flotation testing was recommended to confirm the optimum grind size and reagent regime.
10.1.5.3 Effect of Pulp Temperature
For the ST1 Composite, the effect of pulp temperature on flotation performance was evaluated at temperatures ranging from 50°C to 70°C. Initial rougher flotation tests indicated that increasing the pulp temperature from 60°C to 70°C resulted in a higher rougher concentrate grade but slightly lower recovery. Subsequent testing confirmed that flotation performance improved at the elevated temperature of 70°C. Under otherwise identical operating conditions, a pulp temperature of 70°C produced a 2nd cleaner concentrate grading 19.4% TREO at 57.0% recovery, compared to a concentrate grading 16.0% TREO at 39.2% recovery at 50°C. The higher temperature also improved rougher flotation performance, resulting in both higher rougher concentrate grade and recovery. Based on these results, a pulp temperature of 70°C was selected for subsequent flotation test work.
10.1.5.4 Effect of Pulp Density
For the ST1 Composite, rougher flotation performance was strongly influenced by pulp density. At 19% solids, rare earth mineral recovery to the combined rougher concentrate was only 31.3%, compared to 70.7% at approximately 35% solids. Consequently, a rougher flotation pulp density of approximately 35% solids was adopted for subsequent test work.
10.1.5.5 Evaluation of Depressant Scheme
For the ST1 Composite, depressant testing included both depressant selection and dosage optimization. Results demonstrated that sodium fluorosilicate played a critical role in maintaining flotation selectivity, as partial replacement with CMC resulted in poor flotation performance. Increasing the sodium fluorosilicate dosage above the optimum level adversely affected both concentrate grade and recovery, with the most favourable results obtained at dosages of approximately 500-600 g/t. Higher F220 dosages in the rougher flotation stages improved both TREO grade and recovery in the final concentrate. Alternative reagent schemes using F250 as the depressant or sodium silicate with hydroxamate collectors produced inferior flotation performance. Based on
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 105 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
these results, a depressant scheme comprising F220 and sodium fluorosilicate was selected for subsequent test work.
For the Master Composite, depressant testing focused on depressant selection and dosage optimization. Similar to the ST1 Composite, sodium fluorosilicate was required to maintain flotation selectivity, with the most favourable performance achieved at dosages of approximately 600-650 g/t. Increasing the dosage to 750 g/t adversely affected flotation performance. Alternative reagent schemes incorporating CMC, citric acid, or Calgon produced inferior results. Evaluation of alternative depressants indicated that F500 provided slightly better flotation performance than F220, while F200 performed similarly to F500 in the rougher and scavenger stages but yielded poorer cleaner flotation performance. Overall, sodium fluorosilicate remained a key component of the preferred depressant scheme, while F500 was identified as a potential alternative depressant warranting further investigation.
10.1.5.6 Apatite Pre-flotation
For the Master Composite, apatite pre-flotation was evaluated to assess the potential for removing apatite, the principal gangue mineral, prior to rare earth flotation. Testing using both Berol 8305 and FA-2 apatite collectors demonstrated poor selectivity between apatite and rare earth minerals. Although apatite recovery was achieved during pre-flotation, significant rare earth mineral losses to the apatite concentrate were also observed. Consequently, apatite pre-flotation was not considered a viable pre-treatment step for improving rare earth flotation performance.
10.1.5.7 Bench Scale Flotation Results of ST40 Composite Sample
For the ST40 Composite, eight flotation tests were conducted to evaluate rare earth flotation performance using various collector and depressant schemes, as well as the potential for barite pre-flotation. Collectors evaluated included SHA, REEC5, Aero6493, PAM200, and AM810, while F500 and sodium fluorosilicate were tested as depressants.
Rougher flotation tests demonstrated that the fatty acid collectors REEC5 and Aero6493 were less selective than hydroxamate-based collector schemes. The best rougher flotation results were obtained using SHA and Aero6493, producing combined rougher concentrates grading approximately 1.21-1.26% TREO at recoveries of 85.7-87.0%. Variations in F500 and sodium fluorosilicate dosages had only a minor impact on flotation performance.
Cleaner flotation testing evaluated both rare earth flotation and barite pre-flotation. Barite pre-flotation using S72 and Aero845 produced a high-purity barite concentrate grading approximately 52-53% Ba (about 90% barite purity) with 43.1% barium recovery, indicating potential for by-product recovery. However, subsequent rare earth flotation performance remained poor, with cleaner concentrate grades of less than 1.0% TREO. The best rare earth flotation result was achieved using REEC5, Aero6493, and F500, producing a first cleaner concentrate grading 1.44% TREO at approximately 40% recovery. Testing with the PAM200-AM810 collector system was unsuccessful, yielding a 2nd cleaner concentrate grading only 1.20% TREO at 5% recovery.
Overall, the ST40 Composite demonstrated a substantially poorer flotation response than the ST1 and Master Composite samples.
10.1.5.8 Bench Scale Flotation Results of ST19 Composite Sample
For the ST19 Composite, two flotation tests were conducted to evaluate rare earth flotation performance using different collector schemes and operating conditions. Test F23 utilized a mixture of SHA and Aero6493 at a pulp temperature of 50°C, while test F44 employed a PAM200-AM810 collector mixture at 70°C and incorporated two cleaner flotation stages. The SHA-Aero6493 collector system produced a combined rougher concentrate grading
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 106 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
1.56% TREO at 75.4% recovery. In comparison, the PAM200-AM810 collector system generated a rougher concentrate grading 3.81% TREO at 55.9% recovery and a 2nd cleaner concentrate grading 7.63% TREO at 45.4% recovery. Although the PAM200-AM810 collector system improved concentrate grade, the flotation performance of the ST19 Composite remained inferior to that achieved for the ST1 and Master Composite samples, indicating a more limited response to beneficiation by flotation under the conditions evaluated.
10.1.5.9 Mineralogical Analysis of Selected Flotation Products
Mineralogical characterization of selected flotation products from the ST1 Composite (tests F8 and F37) and Master Composite (test F105) was conducted using TIMA-X and semi-quantitative XRD to evaluate mineral deportment, concentrate composition, and rare earth mineral liberation.
In the ST1 Composite, progressive rougher flotation concentrates from test F8 contained between 21.7% and 41.9% rare earth minerals, with the principal gangue minerals consisting of ankerite, apatite, siderite, and calcite. The optimized flotation test (F37) produced a 2nd cleaner concentrate containing 53.5% rare earth minerals, with residual gangue comprised primarily of carbonates (20.7%), apatite (16.8%) and sulphides (4.7%), indicating that carbonate and apatite rejection remained the principal limitation to further concentrate upgrading. Rare earth losses to rougher tailings were low, with only approximately 1.4% rare earth minerals reporting to tailings.
For the Master Composite, the optimized flotation test (F105) produced a 2nd cleaner concentrate containing approximately 21.3% rare earth minerals, representing an upgrade of approximately five times relative to the head sample. The dominant gangue minerals in the concentrate were apatite (42.3%) and carbonates (33.6%), suggesting that improved depression of these minerals could further enhance concentrate grade. Rare earth mineral losses to rougher tailings were also low, with approximately 0.5% rare earth minerals reporting to tailings.
Liberation analysis indicated that the major rare earth minerals were generally well liberated in the final flotation concentrates. Burbankite and monazite exhibited the highest liberation, while bastnaesite/synchysite/parisite and ancylite showed higher liberation in the ST1 Composite than in the Master Composite. The results also indicated that rare earth mineral losses to tailings were largely associated with poorly liberated particles, highlighting the importance of adequate grinding and mineral liberation for flotation performance. Apatite was highly liberated in the Master Composite concentrate, confirming that limitations in flotation selectivity, rather than mineral locking, were responsible for its reporting to the rare earth concentrate.
10.1.6 Conclusions
The following conclusions were drawn from the beneficiation test work completed on samples from the Sarfartoq deposit:
The TREO grades of the samples evaluated were highly variable, ranging from approximately 0.6% to 6.4% TREO. The four principal composites tested, ST1, ST19, ST40, and Master Composite, contained 3.21%, 1.05%, 1.10%, and 1.77% TREO, respectively.
Mineralogical characterization of the composite and variability samples identified bastnaesite, synchysite/parisite, monazite, burbankite, ancylite, and kukharenkoite as the principal rare earth minerals. The relative abundance of these minerals varied significantly among the samples. Notably, the ST1 Composite was the only composite containing a significant proportion of burbankite, which contributed to its distinct mineralogical characteristics and flotation response.
Flotation was identified as the most effective beneficiation method for concentrating rare earth minerals from the Sarfartoq samples. Neither magnetic separation nor ore sorting consistently achieved significant rejection of gangue minerals or upgrading of rare earth mineralization.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 107 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Among the collector systems evaluated, a mixture of PAM200 and AM810 provided the most favourable flotation performance. For depressants, the combination of sodium fluorosilicate and F220 lignosulfonate achieved the highest selectivity and concentrate grades. The depressant F500 showed potential as an alternative reagent and warrants further investigation.
Flotation performance was highly sensitive to reagent selection and dosage, particularly the collector and depressant schemes employed. It was found that the final REO grade was very sensitive to the collector and depressant dosages.
High-intensity conditioning and relatively high pulp densities during conditioning and rougher flotation were found to be important for achieving acceptable flotation performance.
Optimum flotation performance was generally achieved at elevated pulp temperatures in the range of 60°C to 70°C.
Finer primary grind sizes resulted in improved flotation response, with the most favourable results generally obtained at grind sizes of approximately P100 = 25-38 µm.
10.2 2023 Mineralogical Characterization of Sarfartoq Samples
10.2.1 2023 Mariano Preliminary Mineralogical Analysis
Two composite samples from the Sarfartoq Deposit, Greenland, designated ST1 and ST40, were submitted for REE mineralogical characterization in 2023 to Mariano Consulting Geologists. Previous studies had suggested that burbankite may be an important REE-bearing mineral in these samples.
Burbankite, with the chemical formula (Na,Ca) (Sr,Ba,REE) (CO3)5, exhibits significant compositional variability. Published studies indicate that its total REE2O3 content typically ranges from approximately 2.5 wt.% to 23 wt.%, with rare earth distributions dominated by light rare earth elements (LREEs).
The objective of the study was to identify and characterize the REE mineral assemblages, evaluate their distribution within the samples, and confirm the presence of burbankite. The investigation was conducted as a preliminary assessment to provide rapid mineralogical information, with more detailed characterization recommended for definitive mineralogical evaluation.
The head composite samples contained 3.13% TREO (ST1) and 1.07% TREO (ST40).
SEM-EDS analyses indicated similar gangue mineralogy in both samples, dominated by siderite with minor calcite and apatite. ST40 also contained minor ferroan dolomite, while accessory minerals included barite, strontianite, alstonite, and trace sphalerite. ST1 contained accessory barite and witherite.
Rare earth minerals occurred as fine-grained intergrowths with barium- and strontium-bearing minerals. The dominant REE-bearing phase in ST1 was an unidentified Fe-Ba-Sr-Ca-REE-Th mineral, whereas the principal REE minerals in ST40 were calcioancylite-(Ce) and calcioancylite-(Nd).
The study did not confirm the presence of burbankite in either ST1 or ST40. The complex and fine-grained nature of the REE mineralization indicated that further mineralogical characterization, including X-ray diffraction and electron microprobe analysis, was required to definitively identify the REE-bearing phases.
10.2.2 2023 XPS Mineralogical Analysis
Mineralogical characterization was subsequently conducted by XPS Expert Process Solutions on the ST1, ST40, and Master Composite samples. The study incorporated TIMA (Tescan Integrated Mineral Analyser), Electron
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 108 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Microprobe Analysis (EMPA), and X-ray diffraction (XRD) techniques to provide a detailed assessment of the rare earth mineral assemblages and to confirm the presence or absence of burbankite. The investigation was undertaken following earlier mineralogical studies that suggested burbankite may be an important REE-bearing mineral phase at Sarfartoq.
10.2.2.1 Mineralogical Analysis Results
The modal mineralogy and normalized REE mineral content of the ST1, ST40, and Master Composite samples as determined by TIMA analysis are presented in Figure 10-1..
Figure 10-1 Modal Mineralogy and REE Mineral Content Comparing Three Samples
TIMA and EMPA analyses identified significant mineralogical variability among the composite samples. The ST1 Composite was dominated by ankerite (48.9%) and siderite (15.9%), while the Master Composite was predominantly ankerite (75.9%). In contrast, the ST40 Composite was characterized by high proportions of siderite (38.1%), barite (21.9%), ankerite (15.9%), and alstonite (10.1%).
The dominant REE-bearing minerals also varied between the composites. In the ST1 Composite, the principal REE minerals were carbocernaite (2.7%), monazite (1.9%), and bastnaesite (1.3%). The Master Composite was dominated by monazite (3.1%), with lesser amounts of bastnaesite and synchysite. In the ST40 Composite, the primary REE-bearing phase was a Ba-Ce carbonate mineral identified as Qaqarssukite/Huanghoite (1.5%), accompanied by minor monazite, ancylite, carbocernaite, and bastnaesite. An unresolved REE-bearing phase was identified in all composites and was most abundant in ST40.
These results demonstrated substantial variability in both gangue and REE mineral assemblages across the Sarfartoq composites, indicating that mineralogical differences may significantly influence beneficiation and flotation performance An unresolved REE-bearing phase was identified in all three composites. Due to its low abundance and complex textural characteristics, XPS recommended additional TIMA and EMPA analyses on REE concentrate samples to facilitate definitive mineral identification.
10.2.2.2 Concentrate XRD Analysis
Three REO concentrate samples were submitted for X-ray diffraction (XRD) analysis. Following phase identification, Rietveld refinements were completed to estimate the modal abundance of the identified minerals. The results are summarized in Table 10-2. XRD analysis identified several REE-bearing minerals, including calcioburbankite, carbocernaite, bastnaesite, and monazite, together with carbonate gangue minerals such as
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 109 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
ankerite, calcite, and siderite. Notably, calcioburbankite was identified in all three concentrate samples, while carbocernaite was particularly abundant in Concentrates 1 and 3. These results indicate that although burbankite was not identified in the composite samples by TIMA/EMPA, burbankite-group minerals were detected in the flotation concentrate products by XRD.
Table 10-2 XRD Reitveld Analysis Results for all three REO Concentrates
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
Mineral | | REO Concentrate 1 | | | REO Concentrate 2 | | | REO Concentrate 3 Abundance (%) |
Abundance (%) | Abundance (%) |
| Ankerite |
| 45.50 | 49.00 |
| 68.63 |
| Calcite | | | 13.49 | | | 16.45 | | | 7.89 |
| Siderite |
| 9.49 | 9.14 |
| 7.77 |
| Calcioburbankite | | | 3.34 | | | 0.45 | | | 0.42 |
| Monazite |
| 1.55 | 0.88 |
| 0.55 |
| Baryte | | | 9.05 | | | 5.20 | | | 4.74 |
| Apatite |
| 4.84 | 12.71 |
| 3.66 |
| Bastnaesite | | | 4.65 | | | 3.90 | | | 3.38 |
| Ce-Oxide |
| 0.04 | 1.50 |
| 0.16 |
| Carbocernaite | | | 8.05 | | | 0.77 | | | 2.79 |
10.2.3 Conclusions
XPS mineralogical investigations demonstrated that the REE mineralogy of the Sarfartoq composites is more complex than previously recognized. TIMA and EMPA analyses identified carbocernaite, monazite, bastnaesite, synchysite, ancylite, and Ba-Ce carbonate minerals as the principal REE-bearing phases and did not confirm the presence of burbankite in the composite samples. However, subsequent XRD analysis of flotation concentrates identified both carbocernaite and calcioburbankite, indicating the presence of burbankite-group minerals in the beneficiation products. The study also highlighted significant mineralogical variability among the ST1, ST40, and Master composites, which may explain differences observed during beneficiation and flotation testing.
10.3 2019 SGS Scoping Rare Earth Leaching Test Work
Various flotation concentrates generated during previous metallurgical studies were used in the leaching test program. In addition, a series of tests was conducted using whole-ore samples. Head assay results are summarized in Table 13-X, which also identifies the flotation test from which each concentrate was derived and the corresponding leaching tests in which it was used. The flotation concentrates were tested as received, with no additional size reduction or sample preparation applied prior to leaching.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 110 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Table 10-3 Summary of Feed Samples and Head Assays for Leaching Test Work
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
Feed | Ro Conc (F 1,2,5,7, 9, 15,16) | | Ro Conc | | Ro Conc (F 39, 43) | | Ro Conc | | | Whole ore | |
(F 21, 22, 26, 27, | (F 39, 41, 42, 43, | Master Comp 4 |
30) | 45, 50) | (-400 mesh) |
Test | | AL 1,2,4 | | | R 2 to 6 | | PL 3 | PL 4 and 5.1 AL 15 | AL 16.1 PL 6 |
R1 | AB 4 & 5 |
AB 1 & 3 and PL 1 | PL 2 |
| Al (%) |
| 0.18 | 0.22 | 0.24 | 0.16 |
| 0.31 |
|
| Fe (%) | | | 10.50 | | | 12.20 | | | 14.80 | | | 11.10 | | | 10.10 | |
| Mg (%) |
| 4.00 | 4.40 | 4.28 | 4.15 |
| 6.05 |
|
| Ca (%) | | | 17.22 | | | 16.94 | | | 14.70 | | | 17.20 | | | 17.70 | |
| F (%) |
| 0.56 | 0.42 |
|
|
| 0.46 |
| 0.15 |
|
| CO3 (%) | | | 38.20 | | | 39.40 | | | 37.60 | | | 37.00 | | | - | |
| TREE (%) |
| 8.22 | 4.94 | 6.24 | 6.11 | 1.92 |
10.3.1 Atmospheric Acid Leaching (AL) of Flotation Concentrate
10.3.1.1 Dilute Acid Pre-Leaching (PL) of Flotation Concentrate
A preliminary dilute acid leach test (PL1) was conducted on a composite flotation concentrate to evaluate the potential for selectively removing acid-soluble gangue minerals prior to downstream leaching. The test was performed at pH 4, 50°C, and a residence time of 3 hours using hydrochloric acid. Results indicated that the pre-leach selectively dissolved acid-soluble gangue elements, achieving extractions of approximately 52% Ca, 52% Mg, and 43% Mn, while REE dissolution remained negligible. Although gangue removal was achieved, the overall reduction in impurity content was limited and only a minor upgrade in REE grade was realized. Consequently, the dilute acid pre-leach was considered ineffective as a standalone pre-treatment step for significantly upgrading the flotation concentrate or reducing impurity levels ahead of concentrated acid leaching.
10.3.1.2 Strong Acid Leaching of Flotation Concentrate
Direct leaching of a flotation concentrate was evaluated using hydrochloric acid (HCl) and sulphuric acid (H SO4) under atmospheric conditions. Three tests were completed to assess the effects of lixiviant type, acidity, temperature, and residence time on rare earth extraction. Test AL1 utilized 100 g/L HCl for 6 hours at 50°C, while tests AL2 and AL4 employed 50 g/L and 75 g/L H SO4, respectively, with AL4 extending the leach duration to 48 hours. Acid consumption for AL1, AL2 and AL4 tests were found to be 566 kg/t, 828 kg/t and 1512 kg/t, respectively.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 111 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Figure 10-2 Extraction Results of AL1, AL2 and AL4 Tests
Results showed that the 100 g/L HCl leach (AL1) achieved the highest REE extractions, whereas the 50 g/L H SO leach (AL2) produced the lowest recoveries (Figure 10-2). Increasing sulphuric acid concentration and leach residence time improved extraction by approximately 10-15%, although overall recoveries remained moderate. Heavy rare earth elements (HREEs) consistently exhibited higher extraction than light rare earth elements (LREEs), which was attributed to possible precipitation of REE fluorides during leaching. Under the conditions tested, individual REE extractions generally remained below 75%, indicating that direct atmospheric acid leaching of the flotation concentrate was not sufficient to achieve high rare earth recoveries.
10.3.1.3 Concentrated Acid Leaching of Calcined Flotation Concentrate
To improve rare earth extraction, flotation concentrates were first roasted at 750-900°C to decompose carbonate and fluorocarbonate minerals prior to hydrochloric acid leaching in a six-roast test (R1 to R6). Roasting resulted in near-complete removal of carbonate minerals (>97% CO3 removal) and upgraded the REE content of the calcines through mass reduction. Subsequent series of atmospheric leaching of the calcines (AL3, AL5 to AL14) was conducted using 50-150 g/L HCl at 50°C.
The roast-leach process achieved substantially higher recoveries than direct acid leaching of flotation concentrates. Increasing roast temperature improved REE extraction, with the best results obtained from calcines roasted at 900°C. Likewise, higher leach acidities improved extraction, although only marginal gains were observed above 100 g/L HCl. Under optimum conditions, approximately 95% Nd and 95% Dy extraction were achieved using a concentrate roasted at 900°C followed by leaching in 100 g/L HCl. Acid consumption was relatively high, ranging from approximately 420 to 960 kg HCl/t concentrate depending on test conditions.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 112 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
The results demonstrated that roasting prior to hydrochloric acid leaching significantly enhanced REE recovery by reducing carbonate content and mitigating the effects of fluoride-related REE losses observed during direct acid leaching. However, substantial dissolution of gangue elements also occurred, indicating that downstream impurity removal would be required prior to rare earth product recovery
10.3.2 Acid Baking (AB) followed by Water Leaching (WL)
10.3.2.1 Acid Baking (AB) of Flotation Concentrate
Acid baking tests were conducted on flotation concentrate samples to evaluate the extraction of REEs using sulphuric acid bake followed by water leaching. The program investigated the effects of acid dosage (1,500-2,000 kg/t H SO4) and bake temperature (250-350°C) on REE recovery.
The tests achieved relatively high extraction of light rare earth elements (LREEs), with optimum recoveries of approximately 88% Nd and 94% Ce, while heavy rare earth element (HREE) extraction remained significantly lower, with recoveries ranging between 29-37% Dy. Increasing the acid dosage from 1,500 kg/t to 2,000 kg/t H SO improved REE extraction, whereas increasing the bake temperature above 250°C resulted in little additional benefit and increased reagent consumption.
The results indicated that sulphuric acid baking was effective in liberating and solubilizing the LREE-bearing minerals, likely through successful monazite cracking. However, the comparatively low HREE recoveries suggested either incomplete dissolution or re-precipitation of HREE-bearing species during the process. Consequently, while acid baking achieved higher LREE extraction than direct atmospheric acid leaching, it was less effective for HREE recovery and was therefore not considered the optimum stand-alone process route.
10.3.2.2 Acid Baking (AB) of a Calcined Flotation Concentrate
A flotation concentrate was first roasted at 800°C and subsequently subjected to sulphuric acid baking followed by water leaching to evaluate the effect of roasting on acid bake performance. The objective was to determine whether decomposition of fluorocarbonate minerals prior to acid baking would enhance rare earth extraction.
Roasting prior to acid baking significantly improved HREE extraction compared with direct acid baking of flotation concentrate. Under the test conditions evaluated, the roast-acid bake-water leach process achieved extractions of approximately 90% La, 93% Ce, 89% Nd, 66% Dy, and 77% Y. In comparison, direct acid baking under similar conditions achieved only 36% Dy and 44% Y extraction (Test ID: AB3).
The results demonstrated that pre-roasting enhanced the effectiveness of the acid bake process, particularly for HREE recovery, likely by decomposing fluorocarbonate minerals and reducing fluoride-related losses that were observed in some direct leaching and acid baking tests. Although LREE extraction was already high in the direct acid bake tests, roasting provided a substantial improvement in HREE extraction and overall rare earth recovery.
10.3.2.3 Acid Baking (AB) of Pre-Leached Flotation Concentrate
Pre-leaching followed by sulphuric acid baking and water leaching was evaluated as a means of removing acid-soluble gangue minerals and carbonates prior to rare earth extraction. Flotation concentrates were pre-leached under dilute acidic conditions before the residues were subjected to acid baking at varying temperatures, acid dosages, and retention times followed by water leaching. The pre-leach stage was conducted at relatively mild conditions (50-75°C, pH 1.5 - 2.0, and 1.5 - 2 hours retention time)
Results demonstrated that incorporating a pre-leach step significantly improved overall REE recovery, particularly for HREEs. As shown in Figure 10-3, the combined pre-leach and acid bake process achieved approximately 93% Nd extraction and 66% Dy extraction, compared with 84% Nd and 29% Dy obtained through direct acid baking
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 113 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
alone. The improvement was most pronounced for the HREEs, indicating that pre-leaching enhanced the effectiveness of subsequent acid baking and water leaching.
Figure 10-3 Comparison of REE Extraction from Direct Acid Bake and Pre-leach Followed by Acid Bake
Additional testing examined the effects of acid bake temperature, bake time, and acid dosage. Increased acid dosage generally improved REE extraction, whereas extending bake time or increasing bake temperature above approximately 220-250°C provided limited additional benefit. The best overall performance was achieved with a pre-leach followed by acid baking at 220°C using 1,200 kg/t H SO , yielding recoveries of approximately 89% Nd and 61% Dy.
A counter-current pre-leach configuration utilizing recycled acid bake liquor was also investigated. However, significant REE re-precipitation occurred during pre-leaching, likely due to gypsum formation, resulting in substantial soluble REE losses. Consequently, the recycle pre-leach configuration was not considered viable under the conditions evaluated and would require further optimization.
10.3.2.4 Acid Baking of Pre-Leached Whole Ore
In addition to flotation concentrate testing, a pre-leach and acid bake process was evaluated using whole-ore material. The process consisted of a dilute acid pre-leach followed by sulphuric acid baking of the pre-leach residue and subsequent water leaching. The objective was to assess whether acceptable rare earth recoveries could be achieved without prior flotation concentration.
The pre-leach stage (50°C, pH 1.8-, and 1.5-hours retention time) effectively dissolved carbonate minerals and other acid-soluble gangue components but extracted only minor amounts of REEs. The pre-leached residue was subsequently acid baked at 200°C using sulphuric acid dosages of 900 kg/t and 1,200 kg/t, followed by water leaching. Overall REE extractions were substantially improved compared to the pre-leach stage alone.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 114 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
The best results were achieved at an acid dosage of 900 kg/t H SO , resulting in overall recoveries of approximately 78% Nd and 41% Dy. Increasing the acid dosage to 1,200 kg/t H SO did not improve recovery and may have promoted additional gypsum formation, leading to increased rare earth losses.
Although the pre-leach and acid bake process demonstrated the ability to extract a significant proportion of the rare earths directly from whole ore, the recoveries achieved were lower than those obtained from equivalent treatment of flotation concentrates.
10.3.3 Two-Stage Leaching
Several two-stage leaching approaches were evaluated to recover REEs remaining in residues generated from primary leaching and acid baking tests. The test work investigated treatment of (i) acid bake-water leach residues from flotation concentrates, (ii) atmospheric hydrochloric acid leach residues from flotation concentrates, and (iii) atmospheric hydrochloric acid leach residues from whole ore samples. In these flowsheets, the primary leach residues were subjected either to an alkaline metathesis treatment followed by hydrochloric acid re-leaching, or to roasting (calcination) followed by hydrochloric acid re-leaching. The objective was to convert refractory REE-bearing compounds, particularly fluoride-bearing phases, into more soluble forms and thereby improve overall REE recovery.
Metathesis involved treatment of the leach residue with NaOH or Na22CO3 prior to re-leaching. This step was intended to convert poorly soluble rare earth fluoride compounds formed during primary leaching into more soluble hydroxide or carbonate phases that could subsequently be dissolved during hydrochloric acid re-leaching.
The most successful results were achieved when metathesis was applied to acid bake-water leach residues from flotation concentrates. Treatment with 10% NaOH or 10% Na4CO3, followed by hydrochloric acid re-leaching, produced overall recoveries of approximately 98-99% Nd and 92-98% Dy, demonstrating that the metathesis step was highly effective at recovering rare earths remaining in the acid bake residue.
Metathesis followed by hydrochloric acid re-leaching was also applied to residues generated by direct atmospheric HCl leaching. For flotation concentrate residues, overall recoveries of approximately 58% Nd and 63% Dy were achieved, indicating that this approach was less effective than treatment of acid bake residues.
For whole ore samples, atmospheric HCl leaching followed by 50% NaOH metathesis and hydrochloric acid re-leaching achieved overall recoveries of approximately 92% Nd and 94% Dy. Although technically successful, this process required substantial NaOH consumption due to reactions with gypsum and barium sulphate present in the leach residues.
A separate route involving calcination and re-leaching of atmospheric HCl leach residues from whole ore was also evaluated. This approach achieved only approximately 49% Nd and 67% Dy recovery and did not provide the improvements observed with metathesis treatment.
Overall, the results demonstrated that fluoride-bearing phases were a significant constraint on REE recovery and that alkaline metathesis was an effective method for liberating rare earths from these phases. However, the high reagent consumption associated with the process indicated that further optimization and economic evaluation would be required before advancement of the flowsheet.
10.3.4 Conclusions
The following conclusions were drawn from the leaching test work completed on samples from the Sarfartoq deposit:
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 115 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Dilute acid pre-leaching selectively dissolved carbonate gangue minerals but resulted in minimal REE extraction and only limited upgrading of flotation concentrates.
Direct atmospheric acid leaching of flotation concentrates achieved only moderate REE recoveries, with hydrochloric acid performing better than sulphuric acid. Rare earth extractions generally remained below 75%, with HREEs showing higher recoveries than LREEs.
Roasting flotation concentrates prior to hydrochloric acid leaching significantly improved REE extraction, achieving up to approximately 96% Nd and 97% Dy recovery. This was identified as one of the most promising process routes evaluated.
Sulphuric acid baking produced high LREE recoveries, and incorporation of a pre-leach stage improved HREE extraction. The best pre-leach and acid bake flowsheet achieved approximately 93% Nd and 66% Dy recovery.
Two-stage leaching using alkaline metathesis followed by hydrochloric acid re-leaching was highly effective in recovering REEs remaining in leach residues, achieving overall recoveries of up to 98-99% Nd and 92-98% Dy. However, reagent consumption was high and further optimization was recommended.
10.4 Early Test Work
Metallurgical test work completed in support of the 2012 Updated Mineral Resource (Technical Report on the Sarfartoq Project, West Greenland) reported that early beneficiation and hydrometallurgical testing was conducted at the Saskatchewan Research Council (SRC) on material from the ST1 Zone, which was interpreted at the time to host rare earth mineralization primarily within bastnaesite and monazite. The objective of the work was to evaluate preliminary beneficiation and extraction flowsheets for the Sarfartoq rare earth mineralization.
Early hydrometallurgical testing demonstrated that acid baking followed by leaching could achieve rare earth recoveries exceeding 90%. Preliminary flotation and gravity separation testing also demonstrated the potential to upgrade the mineralization prior to hydrometallurgical treatment, while additional beneficiation and leaching studies were recommended.
Further metallurgical testing completed in support of the 2011 Preliminary Economic Assessment (PEA) by Hazen Research Inc and SRC confirmed the potential of an acid bake-water leach processing route. In parallel, flotation, gravity separation, and magnetic separation were evaluated as potential pre-concentration methods.
Pre-leaching followed by acid bake-water leach testing achieved high rare earth recoveries under a range of baking conditions. TREO) recoveries ranged from approximately 87% to 92%, with the best result obtained at 200°C for 2 hours, achieving 92.4% TREO recovery, including 92.5% LREO and 78.0% HREO recovery. These early studies demonstrated the technical potential of acid baking as a hydrometallurgical extraction route for Sarfartoq rare earth mineralization.
Overall, the 2012 metallurgical studies identified acid baking and leaching as a promising extraction route and demonstrated the potential for flotation-based pre-concentration of Sarfartoq rare earth mineralization.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 116 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
11.0 MINERAL RESOURCE ESTIMATES
11.1 Key Assumptions/Basis of Estimate
The ST1 zone is at an intermediate stage of exploration. This section describes the most recent mineral resource estimate update prepared with the latest drilling results and geological interpretation. The primary economic items are rare earth oxides.
The expanded ST1 drill hole database consists of 94 BTW core holes drilled on the deposit between 2009 and 2023. Core recovery has been excellent, averaging close to 100%. A summary of the drilling and sampling is presented in Table 11-1.
Table 11-1 ST1 Drilling Summary
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Year | | | Holes | | | Metres | | | Assay Intervals | | | Metres Sampled | | | Core Size |
2009 | 4 | 573.40 | 216 | 392.55 |
| BTW |
| 2010 | | | 15 | | | 4162.90 | | | 3001 | | | 3790.10 | | | BTW |
2011 | 44 | 10550.92 | 5578 | 11171.82 |
| BTW |
| 2012 | | | 14 | | | 3578.17 | | | 1612 | | | 3230.42 | | | BTW |
2023 | 17 | 4228.90 | 1692 | 3455.75 |
| BTW |
| Total | | | 94 | | | 23094.29 | | | 12099 | | | 22040.64 | | | BTW |
The database includes interval tables for lithology, alteration, degree of oxidation, mineralogy/veining. Lithologic codes used for ST1 are listed in Table 11-2.
Table 11-2 ST1 Lithologic Codes
| | | | | | | | | | | | | | |
| Code | | | Description |
| AMGN | | | Amphibolite Gneiss |
| BX | |
| Breccia |
| CARB | | | Carbonatite |
| DIA | |
| Diabase |
FLT | Fault |
FLT ZN |
| Fault Zone |
| GAB | | | Gabbro |
| GGN | |
| Granitic Gneiss |
| KD | | | Kimberlitic dike |
| OVB | |
| Overburden |
| PEG | | | Pegmatite |
| Q | |
| Quartz |
| UNK | | | Unknown |
| VN | |
| carbonatite vein |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 117 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
11.2 Deposit Modelling
Lithology was interpreted from drill hole intercepts and limited surface sampling data. Leapfrog3d© software was used to assist in the development of sol models with subsequent manual modifications in the form of control strings to further modify the wireframes. A solid model was created for the main intrusive carbonatite bodies and everything beyond these was coded as part of the gneiss complex (Figure 11-1).
Within the gneiss complex, indicator kriging was used to define isosurfaces corresponding to a grade of 0.5% TREO in order to constrain the estimate to mineralized areas (Figure 11-2).
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 118 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
11.3 Exploratory Data Analysis
Drill hole sampling was carried out on 2.0 m nominal widths and ranged between 0.28 and 6 m with a median width of 2.0 m. For statistical analysis and grade estimation it was decided to first composite the grades on 2 m intervals.
REO grades were composited using the ‘best fit’ method for the mineralized domains within the main carbonatite unit and the surrounding gneiss complex grade shell. This procedure produces samples of variable length, but of equal length within a contiguous drill hole zone, ensuring the composite length is as close as possible to the nominated composite length. In this case, the nominated length was set at 2 m. Intervals within the domains that were not sampled were assumed to have zero grade and diluted accordingly.
Statistical analysis was carried out both within the carbonatite domain and within the gneiss complex using grade shell domains defined by indicator kriging with a threshold of 0.5% TREO. The main carbonatite domain hosts the bulk of the significant TREO levels and averages1.68% TREO. Elevated levels in the surrounding gneiss generally occur in close proximity to the carbonatite contact and average 0.65% TREO within the grade envelope.
Statistics for the individual rare earth oxides within the carbonatite and gneiss domains are shown in the following tables.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 119 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Table 11-3 Composite Statistics Carbonatite Domain
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Treo % | La2O3 ppm | | Ce2O3 | | | Pr2O3 | | | Nd2O3 | | | Sm2O3 | | | Gd2O3 | | | Tb2O3 | | | Eu2O3 ppm | Dy2O3 ppm | | Y2O3 ppm | |
ppm | ppm | ppm | ppm | ppm | ppm |
n | 1561 | 1561 | 1561 | 1561 | 1561 | 1561 | 1561 | 1561 | 1561 | 1561 | 1561 |
|
Min | | | 0.05 | | | 91 | | | 221 | | | 26.2 | | | 93 | | | 13.4 | | | 9.5 | | | 0.75 | | | 4 | 2.7 | | | 10 | |
Max | 10.15 | 28567 | 50216 | 4733.9 | 14421 | 1510.5 | 967.2 | 80.35 | 414 | 213.1 | 442 |
|
Median | | | 1.47 | | | 2886 | | | 7263 | | | 863.3 | | | 2828 | | | 279.2 | | | 145.4 | | | 11.88 | | | 64 | 30.8 | | | 62 | |
Mean | 1.68 | 3650 | 8414 | 964.9 | 3147 | 306.4 | 169.5 | 13.25 | 68 | 33.1 | 67 |
|
Variance | | | 1.19 | | | 8392733 | | | 31083083 | | | 329632 | | | 3330667 | | | 28104 | | | 11761 | | | 58 | | | 1337 | 294 | | | 1146 | |
Std Dev | 1.09 | 2897.02 | 5575.22 | 574.14 | 1825.01 | 167.64 | 108.45 | 7.63 | 36.57 | 17.15 | 33.85 |
|
COV | | | 0.65 | | | 0.79 | | | 0.66 | | | 0.60 | | | 0.58 | | | 0.55 | | | 0.64 | | | 0.58 | | | 0.53 | 0.52 | | | 0.51 | |
Table 11-4 Composite Statistics Gneiss Domain
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | Treo | | | La2O3 | | | Ce2O3 | | | Pr2O3 | | | Nd2O3 | | | Sm2O3 | | | Gd2O3 | | | Tb2O3 | | | Eu2O3 ppm | Dy2O3 ppm | | Y2O3 ppm | |
% | ppm | ppm | ppm | ppm | ppm | ppm | ppm |
n | 2055 | 2055 | 2055 | 2055 | 2055 | 2055 | 2055 | 2055 | 2055 | 2055 | 2055 |
|
Min | | | 0.00 | | | 0 | | | 0 | | | 0 | | | 0 | | | 0.0 | | | 0.0 | | | 0.00 | | | 0 | 0.0 | | 0 | |
Max | 7.70 | 20917 | 39444 | 3809 | 11079 | 855.1 | 396.5 | 35.58 | 194 | 151.7 | 647 |
|
Median | | | 0.45 | | | 876 | | | 2211 | | | 273 | | | 929 | | | 100.0 | | | 50.4 | | | 4.31 | | | 23 | 12.4 | | 31 | |
Mean | 0.65 | 1358 | 3202 | 379 | 1263 | 128.6 | 67.0 | 5.57 | 29 | 15.6 | 38 |
|
Variance | | | 0.39 | | | 2545634 | | | 10149329 | | | 113949 | | | 1151231 | | | 9541.4 | | | 2743.8 | | | 17.28 | | | 454 | 132.8 | | 806 | |
Std Dev | 0.63 | 1596 | 3186 | 338 | 1073 | 97.7 | 52.4 | 4.16 | 21 | 11.5 | 28 |
|
COV | | | 0.97 | | | 1 | | | 1 | | | 1 | | | 1 | | | 0.8 | | | 0.8 | | | 0.75 | | | 1 | 0.7 | | 1 | |
11.4 Analysis of Outliers
Before compositing, the grade distribution in the raw sample data was examined to determine if grade capping or special treatment of high outliers was warranted. Log probability plots were examined for outlier populations and decile analyses were performed for La2O3, Ce2O3, Pr2O3 and Nd2O3 within the carbonatite domain. As a general rule, the cutting of high grades is warranted if:
the last decile (upper 10% of samples) contains more than 40% of the metal; or
the last decile contains more than 2.3 times the metal of the previous decile; or
the last centile (upper 1%) contains more than 10% of the metal; or
the last centile contains more than 1.75 times the next highest centile.
It was found that none of these criteria applied to any of the principal REO components. The last decile values ranged from 20.5 to 29.9% and the last centiles ranged from 2.2 to 5.3%.
Probability plots for the major oxides showed no significant outlier populations (Figure 11-3).
It was concluded that no grade capping or special treatment of outliers was warranted.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 120 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
11.5 Density
In 2010 and 2011, 1785 core samples of the various lithologies, alteration and mineralization styles were measured for specific gravity (“SG”) mainly at the Hudson campsite during drill core logging of rock properties, with several checks done by Aurora Geosciences Ltd., Yukon, Canada. Model blocks within the carbonatite solid were assigned a density value of 3.02 based on the median value of 385 density measurements. Model blocks within the gneiss domain were assigned a value of 2.72 which was the mean value of 1105 measurements representing the principle lithologies represented in the gneiss complex.
11.6 Variogram Analysis
Due to restrictions imposed by topography and equipment it was not possible to drill the zone in the preferred orientation across the structure. Many of the holes intersected the mineralized zone at shallow angles supplying little in the way of data to model directional variograms in other orientations. Normalised semi-variogram models for Nd2O3 were interpreted using data within the carbonatite unit with maximum ranges of 90 m (Figure 11-4).
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 121 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
11.7 Block Model and Grade Estimation Procedures
A block model was created in Surpac Vision software using a block size of 5x5x5 metres, sub-blocked to 1.25m. The parameters of the model are summarized in the following table.
Table 11-5 Block Model Parameters
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Min | Max | Extent | Size | | Subcell | | | # Parent |
Size | blocks |
X | 484,550 | 485,700 | 1,150 | 5 | 1.25 |
| 230 |
| Y | | | 7,377,650 | | | 7,378,900 | | | 1,250 | | | 5 | | | 1.25 | | | 250 |
| Z | | 200 | 800 | 600 | 5 | 1.25 |
| 120 |
Model blocks were assigned a lithologic code based on the majority of each block within the solid model of the carbonatite unit. All remaining unassigned blocks below surface were then categorized as gneiss. Block density values were assigned as described in Section 16.5.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 122 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Hard boundaries were imposed between the lithologic domain constraints. An anisotropic search ellipse was oriented paralleling the trend of the carbonatite plunging -49° towards an azimuth of 227° with a tilt of 55° (Axes of rotation using ZXY LRL of 227°, -49°, 55°). Block grades were estimated for REOs using the inverse distance squared method (ID2) in two passes. The first pass used a maximum anisotropic search of 60 m and the second pass used a maximum search distance of 150 m. Composites from at least two drill holes were required to estimate a block. This was accomplished by limiting the number of composites per hole to 4 and specifying the minimum number of composites as 5. Block grades were also estimated using the Nearest Neighbor method (NN) and Ordinary Kriging (OK) for validation purposes.
Details of the block estimation parameters are summarized in Table 11-6.
Table 11-6 ID2 Grade Estimation Parameters
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
Domain | Pass | Search Distances | Min # Composites | Max # Composites | Max per hole |
| Major/Semi- | | | Minor | |
major Axis | Axis |
Carbonatite | | 1 | | | 60 | | | 25 | | | 5 | | | 15 | 4 | |
2 | 150 | 62.5 | 5 | 20 | 4 |
|
Gneiss/Gabbro | | 1 | | | 60 | | | 25 | | | 5 | | | 15 | 4 | |
2 | 150 | 62.5 | 5 | 20 | 4 |
|
The following set of figures illustrates the TREO block grade distribution in plan, section and perspective views.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 123 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 124 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 125 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 126 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Figure 11-8 TREO Block Grades - Perspective View Looking North
11.8 Mineral Resource Classification
The following resource classification definitions are used:
Mineral Resource
A Mineral Resource is a concentration or occurrence of diamonds, natural solid inorganic material, or natural solid fossilized organic material including base and precious metals, coal, and industrial minerals in or on the Earth’s crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location, quantity, grade, geological characteristics and continuity of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge.
Measured Mineral Resource
A ‘Measured Mineral Resource’ is that part of a Mineral Resource for which quantity, grade or quality, densities, shape, physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters, to support production planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 127 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity.
Indicated Mineral Resource
An ‘Indicated Mineral Resource’ is that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics, can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters, to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed.
Inferred Mineral Resource
An ‘Inferred Mineral Resource’ is that part of a Mineral Resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes.
Blocks were classified as ‘Indicated’ if they were within the main carbonatite domain and were estimated in the first pass using a maximum search distance of 60 m. All other estimated blocks were classified as ‘Inferred’.
11.9 Block Model Validation
Block model validation included visual inspection, global bias check and a check for local bias. Each of these is summarized below.
Model verification was initially carried out by visual comparison of blocks and sample grades in plan and section views. The estimated block grades showed reasonable correlation with adjacent composite grades.
A comparison of global mean values within the carbonatite domain shows a reasonably close relationship with samples, composites and block model values (Table 11-7 and Table 11-8).
Table 11-7 Global Mean Grade Comparison Carbonatite Domain
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| REO | | | Composites | ID2 Blocks | OK Blocks | | | NN Blocks |
Pr6O11 ppm | 1003 | 1003 | 991 |
| 1001 |
| Nd2O3 ppm | | | 3163 | 3172 | 3136 | | | 3162 |
Tb4O7 ppm | 13.6 | 13.7 | 13.4 |
| 13.7 |
| Dy2O3 ppm | | | 33.1 | 33.5 | 33.1 | | | 33.5 |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 128 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Table 11-8 Global mean grade comparison Gneiss Domain
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| REO | | | Composites | ID2 Blocks | OK Blocks | | | NN Blocks |
Pr6O11 ppm | 388 | 391 | 386 |
| 393 |
| Nd2O3 ppm | | | 1291 | 1264 | 1250 | | | 1272 |
Tb4O7 ppm | 5.7 | 5.6 | 5.6 |
| 5.6 |
| Dy2O3 ppm | | | 15.9 | 15.5 | 15.4 | | | 15.5 |
The local bias check was done with swath plots that were generated to compare OK, ID3 and nearest neighbour estimates on panels through the Deposit. Results show a reasonable comparison between the methods, particularly in the main portions of the deposit indicated by the bar charts.
Figure 11-9 30 m Swath Plot X Drift Nd2O3
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 129 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Figure 11-10: 30 m Swath Plot X Drift Pr6O11
Figure 11-11: 30 m Swath Plot Y Drift Nd2O3
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 130 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Figure 11-12: 30m Swath Plot Y Drift Pr6O11
11.10 Reasonable Prospects of Economic Extraction
Mineral resources for Sarfartoq are reported independently for an underground, scenario, a surface open pit scenario and a hybrid open pit, underground scenario.
In the rare earth industry, the terms "magnet basket" and "full basket" are commonly used in economic evaluations because not all REE have the same value or demand. The full basket refers to all of the recoverable REO contained in a deposit. The magnet basket includes only those REEs used in manufacturing high-performance permanent magnets. In this case, the magnet basket contains:
Nd2O3 (A major component of NdFeB magnets)
Pr6O11(Often substitutes for Nd as a magnet component)
Dy2O3 (Improves high-temperature performance)
Tb4O7 (Improves coercivity at very high temperatures)
11.10.1 Price Deck
The REOs used for reporting purposes are Pr6O11, Nd2O3, Sm2O3, Eu2O3, Gd2O3, Tb4O7, Dy2O3, and Y2O3. The other REOs (La2O3 and Ce2O3) contained in the deposit were estimated but considered to have no significant value. Price assumptions are presented in Table 11-9. Prices were based on an independent pricing memorandum prepared for Greenland Mines Corp. by Agricola Mining Consultants Pty Ltd. (Agricola 2026).
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 131 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Table 11-9 REO Price Assumptions
| | | | | | | | | | | | | | |
REE oxide | Price US$/kg |
Pr6O11 | |
| $145.00 |
|
Nd2O3 | | | $150.00 | |
Sm2O3 | |
| $10.00 |
|
Eu2O3 | | | $30.00 | |
Gd2O3 | |
| $225.00 |
|
Tb4O7 | | | $3,500.00 | |
Dy2O3 |
| $750.00 |
|
Y2O3 | | | $16.00 | |
11.10.2 Recovery Assumptions, Royalty, and Other Deductions
The value model used for NSR calculations was developed within the optimization block model. The NSR calculations incorporated assumptions regarding metallurgical recovery, product payability, royalty obligations, and other deductions required to estimate the in-situ value of mineralized material for resource reporting purposes.
The assumptions adopted for the current MRE were based on available metallurgical test work, project-specific information, engineering judgement, and discussions completed during the MRE update process. The royalty reflects the applicable Government of Greenland mineral royalty framework and was adopted for the purposes of the current RPEEE assessment. Royalties are a percentage of sales but for NSR calculations they were applied to revenue. More accurate deductions would be applied in further studies.
The assumptions applied during NSR calculations are summarized in Table 11-10.
Table 11-10 NSR Parameters
| | | | | |
Parameter | Value |
Metallurgical recovery | 64% |
Payability | 60% |
Royalties on Revenue | 5.00% |
Insurance on Revenue | 0.50% |
11.10.3 NSR Calculation Methodology
NSR values were calculated for each block within the optimization model using the Agricola 2026 guidance together with the recovery, payability, royalty, and deduction assumptions described above. The resulting NSR values were used as the primary economic parameter for cut-off grade determination, pit optimization, underground stope optimization, and resource reporting evaluations.
Two value fields were developed within the resource block model: NSR_FULL and NSR_MAGNET. The NSR_FULL field represents the estimated payable value of the selected rare earth oxides included in the full economic value model. The NSR_MAGNET field was developed to estimate value associated only with the principal magnet rare earth oxides.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 132 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
The NSR_FULL value model was used for optimization and reporting of both the open pit and underground resource scenarios. The NSR_MAGNET value model was calculated for comparison and sensitivity purposes but was not used as the basis for the reported open pit or underground results.
NSR_FULL
The following oxides were included within the NSR_FULL calculation:
Pr6O11 Gd2O3
Nd2O3 Tb4O7
Sm2O3 Dy2O3
Eu2O3 Y2O3
La2O3 and Ce2O3 were excluded as they were not considered primary value drivers for the purposes of the current economic evaluation and RPEEE assessment because of current low market value of these two oxides.
NSR_MAGNET
The magnet rare earth oxides included within the calculation are:
Pr6O11 Tb4O7
Nd2O3 Dy2O3
The NSR_MAGNET field was developed primarily for sensitivity and comparison purposes.
General NSR Formula
The NSR value for each resource block was calculated using the following relationship:
NSR = » (Grade; x 0.001 * Price; x Process Recovery; X Payability;) x (1 — Royalty — Insurance)
Where:
| | | | | | | | | | | | | | |
Variable | | | Description | |
Grade |
| Estimated oxide grade (ppm) |
|
Price | Long-term oxide price assumption (US$/kg) |
Process Recovery |
| Metallurgical recovery factor (%) |
|
Payability | Payability factor (%) |
Royalty |
| Applicable royalty deduction (%) |
|
Insurance | Insurance cost factor (%) |
11.10.4 TREO % Calculation Methodology
TREO values were calculated and added to the optimization model to provide a consistent reporting metric for resource reporting, reconciliation, and comparison of optimization scenarios.
TREO values were calculated using the rare earth oxide grades contained within the resource block model.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 133 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
The TREO calculation includes the following oxide species:
La2O3 Eu2O3
Ce2O3 Gd2O3
Pr6O11 Tb4O7
Nd2O3 Dy2O3
Sm2O3 Y2O3
TREO was calculated using the following equation:
Formula:
La,03 + Ce,03 + Pre6044 + Nd,03 + Smz03 + Eu,03 + Gd,03 + Tb,0,7 + Dy,03 + Y,03
TREO(%)
10000
where all oxide grades are reported in parts per million (ppm).
The TREO field was utilized as the primary grade reporting metric throughout the resource evaluation process and was used for validation, reporting, and comparison of open pit and underground resource scenarios.
11.10.5 Cost Assumptions
Cost assumptions were developed to support cut-off grade determination, pit optimization, and underground stope optimization. The assumptions are intended solely to support the evaluation of RPEEE and should not be considered detailed operating cost estimates.
Open pit and underground mining costs from recent and publicly available technical studies related to the Sarfartoq Project were compiled and reviewed. Adjustments were made to reflect potential changes in cost conditions since completion of the referenced studies using relevant mining industry inflation indicators and Greenland-specific inflation data to establish cost assumptions considered reasonable for Mineral Resource reporting purposes.
Processing and General & Administrative (G&A) costs were independently developed using available project information, benchmarking against comparable REE projects, engineering judgement, and experience with similar development-stage projects. G&A was adjusted to incorporate feedback from Greenland Mines Ltd. considering their other projects and local expertise.
The NSR cost assumptions for both mining scenarios are presented in Table 11-10.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 134 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Table 11-11 Cost Assumptions Underground and Open Pit Mining
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Operating Cost Assumptions Underground Mining | |
| | Operating Cost Assumptions Open Pit Mining Scenario |
Scenario |
|
| Parameter | | | Value | | | Unit | |
| | Parameter | | | Value | Unit |
Mining | $55.00 | | US$/t | |
| Mining | $6.00 | US$/t mined* |
mined* |
|
Processing | $69.72 | US$/t processed |
| Processing | $69.72 | US$/t processed |
G&A | $16.50 | | US$/t | |
| G&A | $16.50 | US$/t processed |
processed |
|
| UG Breakeven Cut-off | | $141.22 | US$/t |
| OP Breakeven Cut-off | $92.22 | US$/t |
*US$/t mined is mined tonnes without dilution
The resulting cost assumptions were adopted for the development of reporting cut-offs and optimization studies for both the open pit and underground resource scenarios.
11.10.6 Underground Optimization Methodology
Conceptual underground mine design was carried out using Deswik software. Stope design parameters are shown in Table 11-12.
Table 11-12 Stope Optimization Parameters
| | | | | | | | | | | | | | | | | |
| Parameters | Min | | Max | |
| Stope Height (m) | 20 | 20 |
|
| Stope Length (m) | 10 | | 10 | |
| Stope Width (m) | 3 | 10 |
|
| Sub-Stoping Factor | 0.5 | | 0.5 | |
| Dilution | 0 | 0 |
|
The 2026 Sarfartoq resource model was converted into a sub-celled underground optimization model to provide improved definition of mineralized boundaries and reduce the impact of block discretization during stope optimization. The minimum sub-cell size was set at 1.25x1.25x1.25 m.
No crown pillar was utilized during underground optimization. Stope shapes were subsequently clipped to the topographic surface prior to resource reporting. Isolated mineralized blocks and discontinuous areas that could not reasonably support underground extraction were excluded from the reported inventory.
11.10.7 Open Pit Optimization Methodology
Open pit optimization was carried out using Datamine’s Studio NPVS software version 3,0. Parameters are presented in Table 11-13.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 135 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Table 11-13 Open Pit Optimization Parameters
| | | | | | | | | | | | | | | | | |
| Parameter | Value | | Unit | |
| Overall Slope Angle | 45 | degrees |
|
| Mining Cost | 6 | | US$/t mined | |
| Plant Recovery | 64% |
|
| Plant Feed Rate | 700,000 | | tpa | |
| Processing Cost | 69.22 | US$/t |
|
| G&A Cost | 16.5 | | US$/t | |
| Payability | 60% |
|
| Royalties on Revenue | 5 | | % | |
| Insurance on Revenue | 0.5% |
|
| NPV Discount Rate | 8 | | % | |
11.10.8 Hybrid Optimization Methodology
The conceptual hybrid optimization was carried out using Datamine’s Studio NPVS software. Parameters identical to the other two independent methods with the addition of an underground development cost to account for the transition between open pit and underground. An exclusion zone was also included to represent the non-recoverable ore that lies between the open pit and the underground resources. Cost assumptions are summarized in Table 11-11. The hybrid parameters are presented in Table 11-14.
Table 11-14 Hybrid Optimization Parameters
| | | | | | | | | | | | | | | | | | | | |
Parameter | | | Value | | | Unit |
Overall Open Pit Slope Angle | | 45 |
| degrees |
Plant Recovery | | | 64 | | | % |
Plant Feed Rate | | 700,000 |
| tpa |
NPV Discount Rate | | | 8 | | | % |
Underground Development Cost | | 1 |
| US$/t mined |
Exclusion Zone | | | 20 | | | m |
An isometric view of the hybrid open pit and underground stopes are shown in Figure 11-13.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 136 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Figure 11-13 : Isometric Long Section looking NW Perpendicular to Deposit Strike
11.11 Mineral Resource Summary
Mineral resources for Sarfartoq are reported independently for three mining scenarios:
an underground scenario
surface open pit scenario
hybrid open pit and underground scenario
The following subsections summarise each individual mining scenario.
11.11.1 Underground Mining Scenario
Table 11-15 presents the mineral resource estimate for the ST1 zone assuming an underground mining scenario. Table 11-9 and Table 11-11 present the price and cost assumptions used to determine the base case NSR cut-off of $141.22/t.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 137 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Table 11-15 Underground Mineral Resource
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
| |
|
| |
|
| | Magnet Basket | |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| | Full Basket | |
|
|
|
|
|
|
|
|
|
|
|
|
| TREO % |
|
|
|
| Ore |
|
|
|
|
|
|
|
| Tonnes |
|
| TREO |
| | Pr6O11 | | | Nd2O3 | | | Tb4O7 | | | Dy2O3 | | | Eu2O3 | | | Gd2O3 | | | Sm2O3 | | | Y2O3 | | | Ce2O3 ppm | La2O3 ppm | |
| Class |
|
| (000's) |
|
| % |
| ppm | ppm | ppm | ppm | ppm | ppm | ppm | ppm |
| Indicated | | | 7,475 | | | 1.56 | | | 944 | | | 3,009 | | | 13.0 | | | 31.8 | | | 66.9 | | | 160 | | | 298 | | | 63.7 | | | 7,784 | 3,268 | |
Inferred | 2,603 | 1.36 | 774 | 2,443 | 9.3 | 25.9 | 51.6 | 113 | 231 | 57.0 | 6,764 | 3,092 |
|
| Total | | | 10,078 | | | 1.51 | | | 900 | | | 2,863 | | | 12.1 | | | 30.3 | | | 62.9 | | | 148 | | | 281 | | | 62.0 | | | 7,520 | 3,222 | |
Notes:
1. Mineral resource estimate prepared by Ronald G. Simpson of GeoSim Services Inc. with an effective date of July 31st, 2026.
2. Mineral Resources are estimated consistent with CIM Definition Standards and reported in accordance with S-K 1300.
3. Mineral resources are not mineral reserves and do not have demonstrated economic viability.
4. Mineral resources are stated using the following assumptions: REO prices as listed in Table 11-9; assumed deductions of metallurgical
recovery of 64%, payability of 60%, royalties of 5%, and insurance of 0.5%; underground mining costs of US$55 per tonne; processing costs of
US$69.72 per tonne; G&A of US$16.50/t and using the full basket NSR optimization.
5. The base case NSR cut-off of $141.22/t is believed to provide a reasonable margin over operating costs for underground mining and
processing
6. Totals may not sum due to rounding.
11.11.2 Open Pit Mining Scenario
Table 11-16 presents the mineral resource estimate for the ST1 zone assuming an open pit mining scenario. Table 11-9 and Table 11-11 list the price and cost assumptions used to determine the base case NSR cut-off of $92.22/t.
Table 11-16 Open Pit Mineral Resource
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
Class | Ore Tonnes (000s) | TREO % | | Magnet Basket | |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Full Basket | |
|
|
|
|
| TREO % |
Pr6O11 ppm | Nd2O3 ppm | Tb4O7 ppm | Dy2O3 ppm | Eu2O3 ppm | Gd2O3 ppm | Sm2O3 ppm | Y2O3 ppm | Ce2O3 ppm | La2O3 ppm |
Indicated | 6,608 | 1.63 | 979 | 3,114 | 13.5 | 32.9 | 69.0 | 168 | 307 | 65 | 8,108 | 3,444 |
Inferred | 6,015 | 0.88 | 516 | 1,648 | 6.9 | 18.9 | 36.3 | 82 | 164 | 44 | 4,304 | 1,893 |
| Total | | | 12,623 | | | 1.27 | | | 758 | | | 2,415 | | | 10.4 | | | 26.2 | | | 53.4 | | | 127 | | | 239 | | | 55 | | | 6,295 | | 2,705 |
Notes:
1. Mineral resource estimate prepared by Ronald G. Simpson of GeoSim Services Inc. with an effective date of July 31st, 2026.
2. Mineral Resources are estimated consistent with CIM Definition Standards and reported in accordance with S-K 1300.
3. Mineral resources are not mineral reserves and do not have demonstrated economic viability.
4. Mineral resources are constrained by an optimized pit shell using the following assumptions: REO prices as listed in Table 11-9; assumed deductions of metallurgical recovery of 64%, payability of 60%, royalties of 5%, and insurance of 0.5%; open pit mining costs of US$6 per tonne; processing costs of US$69.72 per tonne; G&A of US$16.5/t and using the full basket NSR optimization.
5. The base case NSR cut-off of $92.22/t is believed to provide a reasonable margin over operating costs for open pit mining and processing
6. Totals may not sum due to rounding.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 138 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
11.11.3 Hybrid Mining Scenario
Table 11-17 presents the mineral resource estimate for the ST1 zone assuming a hybrid, combined open pit and underground scenario. Table 11-9 and Table 11-11 list the price and cost assumptions used to determine the base case NSR cut-off of $92.22/t for the open pit component and $141.22/t for the underground component.
Table 11-17 Hybrid Mineral Resource
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
Class | Ore Tonnes (000s) | TREO % | Magnet Basket |
|
|
|
|
|
|
Full Basket |
|
|
TREO % |
Pr6O11 ppm | Nd2O3 ppm | Tb4O7 ppm | Dy2O3 ppm | Eu2O3 ppm | Gd2O3 ppm | Sm2O3 ppm | Y2O3 ppm | Ce2O3 ppm | La2O3 ppm |
Indicated | 6,900 | 1.60 | 963 | 3,070 | 13.2 | 32.3 | 67.9 | 163 | 304 | 65 | 7,972 | 3,355 |
Inferred | 5,341 | 0.96 | 572 | 1,850 | 7.4 | 20.4 | 39.7 | 89 | 181 | 47 | 4,761 | 2,053 |
Total | 12,240 | 1.32 | 792 | 2,538 | 10.7 | 27.1 | 55.6 | 131 | 250 | 57 | 6,571 | 2,787 |
Notes:
1. Mineral resource estimate prepared by Ronald G. Simpson of GeoSim Services Inc. with an effective date of July 31st, 2026.
2. Mineral Resources are estimated consistent with CIM Definition Standards and reported in accordance with S-K 1300.
3. Mineral resources are not mineral reserves and do not have demonstrated economic viability.
4. Mineral resources are constrained by an optimized pit shell using the following assumptions: REO prices as listed in Table 11-9; assumed deductions of metallurgical recovery of 64%, payability of 60%, royalties of 5%, and insurance of 0.5%; open pit mining costs of US$6 per tonne; processing costs of US$69.72 per tonne; G&A of US$16.5/t and using the full basket NSR optimization.
5. The base case NSR cut-off of $92.22/t is believed to provide a reasonable margin over operating costs for the open pit mining and processing component. The base case NSR cut-off of $141.22/t is believed to provide a reasonable margin over operating costs for underground mining and processing component.
6. Totals may not sum due to rounding.
11.12 Factors That May Affect the Mineral Resource Estimate
Areas of uncertainty that may materially impact the Mineral Resource Estimate include:
Commodity price assumptions
Mining engineering assumptions such as dilution and mining losses
Geotechnical engineering assumptions such as open pit slopes
Assumptions that all required permits will be forthcoming
Metallurgical recoveries
Mining and process cost assumptions
Ability to meet and maintain permitting and environmental license conditions and the ability to maintain the social license to operate.
There are no other known factors or issues that materially affect the estimate other than normal risks faced by mining projects in Greenland in terms of environmental permitting, taxation, socio economic, marketing, and political factors. GeoSim is not aware of any known legal or title issues that would materially affect the Mineral Resource estimate.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 139 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
12.0 MINERAL RESERVE ESTIMATES
This section is not applicable.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 140 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
13.0 MINING METHODS
This section is not applicable.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 141 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
14.0 PROCESS AND RECOVERY METHODS
This section is not applicable.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 142 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
15.0 INFRASTRUCTURE
This section is not applicable.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 143 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
16.0 MARKET STUDIES
This section is not applicable.
The Sarfartoq Rare Earths Project is at the exploration and pre-development stage under MEL 2020-32. No exploitation license has been applied for, and no formal Environmental Impact Assessment (EIA) or Social Impact Assessment (SIA) has been submitted.
The environmental and social work completed to date consists of a two-year environmental baseline programme (first year 2023, second year underway in 2026), preliminary characterisation of the radiological setting of the ST1 deposit, and initial engagement with the Government of Greenland regulators and the Qeqqata municipality. The Qualified Person is not aware of any environmental, cultural-heritage or social factor identified to date that would prevent the future development of the Project, subject to completion of the outstanding baseline, impact-assessment and consenting work described below.
17.1 Environmental Setting
The Project is located approximately 60 km south-west of Kangerlussuaq on the north side of the Kangerlussuaq Fjord (Søndre Strømfjord), in a continental sub-arctic setting characterised by ice-scoured gneiss, broad glacial valleys with steeply incised streams and creeks, and elevations from sea level in the fjord to approximately 700 m in the Sarfartoq Valley.
The Sarfartoq exploration camp sits at approximately 600 m elevation. Ground within the core of the carbonatite complex is less rugged and locally more vegetated, reflecting phosphate enrichment in the underlying rocks. The climate is polar continental, with recorded temperatures ranging from approximately —35 °C to +20 °C and generally sparse precipitation; the area is typically ice- and snow-free from May to late part of September, and the coast is ice-free for most of the year. Continuous permafrost underlies the Project area.
The Project area drains into two principal catchments: the Arnangarnup Qoorua (also known as “Paradis Valley”) catchment to the south and the Robinson Valley catchment to the north. Surface-water and groundwater regimes are strongly seasonal, dominated by summer snow-melt and rainfall runoff. Intermittent streams are numerous.
17.2 Environmental Baseline Programme (2023 & 2026)
Greenland Mines Ltd, and its predecessor NNSR, have engaged WSP Danmark A/S to design and execute a multi-year environmental baseline programme at Sarfartoq. The programme is conducted in accordance with the Greenland Guidelines for Preparing an Environmental Impact Assessment Report for Mineral Exploitation in Greenland (2nd edition, MRA 2015) and the Guideline for collection of environmental samples to the Greenland mineral resources environmental sample bank (DCE / Bach et al., 2023, updated 2026), with all samples submitted to the Danish Centre for Environment and Energy (DCE) sample bank for the Government of Greenland. Analytical work is undertaken by Eurofins in Denmark.
Environmental Baseline First year - 2023: The 2023 field programme was carried out from 31 July to 8 August 2023 and comprised: (i) 12 terrestrial lichen (Flavocetraria nivalis) sampling stations, including three reference stations outside the project footprint; (ii) five freshwater sampling stations covering the Paradis Valley and Robinson Valley catchments, with filtered and unfiltered water samples and suspended-matter measurements; (iii)
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 144 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
two marine/intertidal stations (Kangerlussuaq Fjord, in the vicinity of the proposed port and a reference station), with sampling of bladderwrack (Fucus vesiculosus) and blue mussels (Mytilus edulis); (iv) freshwater fish sampling of Arctic char (Salvelinus alpinus) from two lakes, one in each principal catchment; (v) botanical, bird, mammal and insect surveys; and (vi) installation of one continuous water-flow gauging station (OTT ecoLog 1000).
Key findings from the 2023 programme include:
Vegetation. A total of 93 species of vascular plants were recorded across the Project area. Only one Greenland Red List (2018) species - Serrate gentian (Gentianopsis detonsa, Near Threatened, NT) - was recorded, and it lies just outside the south-eastern corner of the license area.
Birds. Bird abundance was low; snow bunting, northern wheatear and long-tailed duck are common and widespread. Red-listed species observed comprised Common Loon (Gavia immer, NT) with behaviour indicating possible breeding at the northern Arctic-char lake, Common Sea Eagle (Haliaeetus albicilla, VU) with a possible breeding site on cliffs south of Paradis Valley, and Greenland White-fronted Goose (Anser albifrons flavirostris, EN) resting at a lake north-east of the camp. A larger lake west of the Project area is designated as a protected white-fronted goose area.
Mammals. Four terrestrial mammal species - muskox (Ovibos moschatus), Arctic fox (Alopex lagopus), Arctic hare (Lepus arcticus) and West Greenland caribou / reindeer (Rangifer tarandus groenlandicus) - occur regularly in the area; all are of Least Concern status. The Kangerlussuaq region hosts one of Greenland's principal caribou and muskox populations of significant subsistence and cultural importance.
Freshwater fish. Arctic char were present in the larger lakes of both catchments; only three-spined stickleback (Gasterosteus aculeatus) was recorded in smaller lakes. The distribution is consistent with a 2012 electro-fishing survey.
Marine. Blue mussels and bladderwrack were sampled successfully; short-horn sculpin (Myoxocephalus scorpius) was not caught, and only Greenland cod (Gadus ogac) was observed at the intertidal stations.
Environmental Baseline Second year - 2026: A second field campaign is scheduled for August/September 2026 and comprises: 15 terrestrial lichen stations (including three reference stations); five freshwater stations distributed in the Paradis and Robinson Valley catchments in proximity to the proposed pit, tailings and process-plant footprints; three marine stations covering the proposed port area and a reference station; renewed Arctic char sampling in both catchments; service of the existing water-flow gauging station and installation of the second station (deferred from 2023 owing to high summer flows); and broader vegetation, bird and mammal observation.
The 2026 programme extends the seasonal record and increases spatial coverage to support the future EIA baseline. A field report will be issued after the 2026 site visit and will form part of the EIA baseline dataset held by GRML.
17.3 Radiological Setting
Available composite head assays from the ST1 mineralised zone indicate uranium concentrations of the order of 5 ppm, well below the 100-ppm threshold of the Greenland Uranium Act (Inatsisartut Act No. 20 of 1 December 2021).
This is a favourable outcome for permitting and distinguishes Sarfartoq from a number of rare earth deposits where uranium content constrains development. The sub-threshold status should nonetheless be confirmed across the whole Mineral Resource as further data are released.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 145 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Thorium is present as a naturally occurring radioactive material (NORM), hosted in the rare earth and accessory mineral phases. Thorium partitions in part to the flotation concentrate - with implications for product specification and the regulation of radioactive material in transport - and in part to the tailings, requiring a NORM management plan covering occupational exposure, product radioactivity, and tailings storage and closure. A radiological baseline is being developed in parallel with the WSP environmental programme.
17.4 Protected Areas and Cultural Heritage
Two designations are material to the Project:
Arnangarnup Qoorua ("Paradis Valley") protected area. A protected area of approximately 96 km² lies within, and is excluded from, the license area. Access is governed by the Rules for field work and reporting regarding mineral resources (excluding hydrocarbons) in Greenland (Government of Greenland, Ref. No. 69.03.20+01, November 2000), which prohibit collection of vegetation, antlers, skulls and relics, disturbance of ruins, graves and antiquities, use of vegetation as solid fuel, open fire within 50 m of scrub vegetation, and traffic and loitering within the designated area, and require aircraft to maintain a minimum of 500 m above ground level (except where aviation regulations or weather require otherwise); fixed-wing landings inside the area require MLSA approval. The MLSA customarily imposes additional restrictions on field-activity approvals within and adjacent to the protected area.
Aasivissuit Nipisat UNESCO World Heritage Site. The wider Kangerlussuaq region includes the UNESCO World Heritage cultural landscape "Aasivissuit Nipisat: Inuit Hunting Ground between Ice and Sea," inscribed in 2018, which extends approximately 235 km east west from Nipisat Island south of Sisimiut to the Greenland Ice Sheet near Kangerlussuaq (with its eastern key locality, Aasivissuit, approximately 20 km north-west of Kangerlussuaq) and includes the living settlement of Sarfannguit. Recognised values include more than 4,000 years of Palaeo-Inuit and Inuit hunting heritage, integrity of the landscape and unimpeded views. Any future infrastructure design and shipping arrangements will need to demonstrably respect these values.
17.5 Waste Rock, Tailings, Water and Closure
The current development concept contemplates a conventional open-pit or underground operation or a hybrid with an initial open-pit transitioning to underground mining, with a flotation concentrator producing a mixed rare earth concentrate for shipment through a proposed port on the north side of Kangerlussuaq Fjord.
Flotation tailings are carbonate-dominated and will carry NORM; together with waste rock and overburden, they will require engineered storage designed for continuous permafrost and Arctic climatic conditions. Water management will address contact water, tailings supernatant, seasonal meltwater and any authorised discharge, with treatment as required to meet Greenland regulatory limits.
Mine closure, progressive reclamation and long-term management of tailings and waste facilities - including their radiological aspects - must be planned from the outset; an exploitation license requires an approved Closure Plan and the posting of financial security prior to the commencement of mining. Detailed engineering of these facilities, cost estimation and closure-cost provisioning will be advanced in subsequent study stages.
17.6 Permitting Framework and Status of Approvals
Mineral activities in Greenland are governed by the Mineral Resources Act (Inatsisartut Act No. 7 of 7 December 2009, as amended). The Mineral License and Safety Authority (MLSA) administer licensing and mine-safety
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 146 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
matters; the Environmental Agency for Mineral Resource Activities (EAMRA) administers environmental matters; and the Mineral Resources Authority (MRA) administers social matters.
Under the Standard Terms for Exploration Licenses for Minerals (Excluding Hydrocarbons), the licensee may conduct low-impact activities without specific approval - geological and geochemical investigations and sampling using handheld equipment (subject to per-site and annual weight limits), hand-held drilling, and non-explosive geophysical surveys. Pre-approval from the MLSA is required for, among other activities, mechanical drilling, use of explosives, sampling in excess of the standing limits, use of radioactive sources, use of vehicles, terrain levelling, and construction of installations, shafts, drifts, or ramps. The MLSA customarily imposes additional site-specific conditions on annual field-activity approvals.
Approvals and permits held or applied for at Sarfartoq to the effective date of this report comprise: (i) Mineral Exploration License MEL 2020-32 (Section 3.2), current, with a license-area expansion (to include the proposed access road corridor and port area) approved on 13 June 2024; (ii) annual field-activity approvals granted by the MLSA under the standard exploration terms, most recently for the 2023 NNSR programme, and for which GRML anticipates seeking approval for the 2026 camp re-opening and continuing baseline work; (iii) the application for indirect transfer of MEL 2020-32 to GRML under Section 69 of the Mineral Resources Act, submitted and under review by the Government of Greenland (Section 3.2). No exploitation-license application has been submitted, and no EIA or SIA has been formally lodged.
Following an amendment to the Mineral Resources Act effective 1 January 2024, an exploitation license may be applied for and granted in parallel with - rather than after - the final approval of the Environmental Impact Assessment (EIA), Social Impact Assessment (SIA) and Impact Benefit Agreement (IBA). This so-called "parallel-track" (or "fast-track") route has been applied on a number of recent Greenland projects, including GreenRoc Mining's Amitsoq graphite project (2024) and Greenland Strategic Minerals' SILA rare earth project (2026), and it is the pathway Greenland Mines Ltd intends to pursue for Sarfartoq.
Under Sections 41 and 43 of the Mineral Resources Act, the holder of an exploration license that has substantiated and delineated a viable mineral deposit which it intends to exploit - and that has complied with the terms of the exploration license - is entitled to be granted an exploitation license, subject to the Company meeting the corporate-form requirements of Sections 45 46 of the Mineral Resources Act (a Greenland-registered public limited company with its management seated in Greenland) and the technical-and-financial-capacity requirements of Sections 66 67 of the Mineral Resources Act.
Under Section 44 of the Mineral Resources Act, before an exploitation license is granted the applicant must submit a project Terms of Reference (ToR) which is published for a statutory 35-day public pre-consultation; consultation on the ToR must be completed no earlier than 24 months before the grant of the license.
Under Section 106 and the Government of Greenland EIA/SIA guidelines, draft EIA and SIA reports must subsequently be published in Greenlandic, Danish and English for a minimum eight-week public consultation with in-town and settlement hearings, followed by a White Paper addressing all comments and the submission of revised, final EIA and SIA reports for approval.
An Impact Benefit Agreement (IBA) is negotiated in parallel between the Company, the Qeqqata municipality and the Government of Greenland. Following the granting of the exploitation license and prior to the commencement of development and production, a Mine Plan and a Closure Plan (including financial security for closure and rehabilitation) must be approved by the MLSA.
Recent exploitation-license grants - Greenland Resources' Malmbjerg molybdenum project (2025) and GreenRoc Mining's Amitsoq graphite project (December 2025) - indicate that the parallel-track process is functional and reasonably timely when advanced-stage geological and resource data support entry to the process.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 147 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Greenland Mines Ltd intends to enter the exploitation-license process on the parallel track.
17.7 Social Baseline, Community Engagement and Impact Benefit Agreement
The Project lies within the Qeqqata municipality; the closest communities are Kangerlussuaq (a logistics and airport town) and Sisimiut (a regional centre approximately 150 km to the north). Sarfannguit, a living settlement within the Aasivissuit Nipisat World Heritage area, and other Qeqqata communities use the region for subsistence caribou and muskox hunting and for fjord fishing. Protection of subsistence use, of the World Heritage cultural landscape, and of the caribou, muskox and fjord fisheries is expected to be central to community acceptance of the Project.
A structured social baseline programme, aligned with the Greenland SIA guidelines (www.govmin.gl), will be developed in parallel with the EIA baseline to support the exploitation-license application and the subsequent negotiation of an Impact Benefit Agreement (IBA) between the Company, the Qeqqata municipality and the Government of Greenland.
Consistent with GRML's intention to pursue the parallel-track exploitation-license process (Section 17.6), the SIA baseline, the EIA baseline (Section 17.2) and the IBA negotiation are being planned and sequenced to advance concurrently, rather than sequentially.
The main objectives of a Greenland SIA process, and therefore of the Sarfartoq social baseline programme, are:
to engage all relevant stakeholders in consultations and public hearings;
to describe and analyse the pre-project social baseline as a basis for development planning, mitigation and future monitoring;
to identify positive and negative social impacts at both local and national level, using the baseline data;
to optimise positive impacts and mitigate negative impacts throughout the Project lifetime; and
to develop a Benefit and Impact Plan to support implementation of the IBA.
GRML anticipates that the IBA will include commitments on local hiring, training, contracting and procurement, including the use of Greenlandic and other Nordic contractors where practicable, and on community-benefit sharing consistent with recent Greenland exploitation-license precedents.
17.8 Qualified Person's Opinion
In the opinion of the Qualified Person, based on the WSP 2023 baseline report, the WSP 2026 baseline programme design, the Company's radiological screening of the ST1 mineralization, and the regulatory framework outlined above, the environmental and social baseline work completed and planned is appropriate to the current pre-development stage of the Project, and no environmental, cultural-heritage or social factor has been identified to date that would preclude access to the Mineral Resource or the future development of the Project.
Key risks and workstreams to be advanced ahead of a Pre-Feasibility Study include: completion of the 2026 baseline field season; a project-specific radiological baseline and NORM management plan; engineering-level design of the tailings storage facility and water-management system for permafrost/Arctic conditions; a formal SIA baseline and structured community engagement in Kangerlussuaq, Sisimiut and Sarfannguit; and initiation of the formal EIA/SIA Terms-of-Reference process with EAMRA and the MRA once the Section 69 license transfer is closed and Company development plans have been consolidated.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 148 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
18.0 CAPITAL AND OPERATING COSTS
This section is not applicable.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 149 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
19.0 ECONOMIC ANALYSIS
This section is not applicable.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 150 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
20.0 ADJACENT PROPERTIES
The Sarfartoq Project (MEL 2020-32) is located in a lightly licensed area of southern West Greenland (Figure 20-1). The Government of Greenland maintains a public register of all active mineral exploration, exploitation and small-scale licenses through the Mineral Resources Authority (MRA) portal (Greenland Mineral Resources Portal). The information summarised in this section is based on that register as retrieved on 23 July 2026, cross-checked against the MRA §16 Exploitation License list (Exploitation license (§16), Mineral Resources Authority).
Only one active exploitation license (§16 mining license) lies within 200 km of the Sarfartoq camp the White Mountain (Qaqortorsuaq) anorthosite mine held by Lumina Sustainable Materials A/S. All other adjacent tenements are exploration or small-scale (§33) licenses held by unrelated third parties. None of the adjacent licenses is contiguous with MEL 2020-32.
20.1 Active Adjacent Licenses
Table 20-1 lists all active mineral licenses within a 200 km radius of the Sarfartoq base camp (approximately 66.68° N, 51.30° W). Distances are measured from the camp to the closest license boundary. License status, holder, area and expiry dates are from the MRA register as of July 2026.
Table 20-1 Overview of Active Adjacent Licenses to Sarfartoq
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
Active adjacent licenses | | | |
License | Type | Holder | Area (km²) | Grant date | Expiry date | | Distance from Sarfartoq | | Target commodity |
MIN 2015-39 | Exploitation (§16) | Lumina Sustainable Materials A/S | 95.8 | 22-Sep-2015 | 22-Sep-2045 | 1 north | Anorthosite (calcium feldspar) |
MEL 2024-128 | Exploration | Arcticulture ApS | 29.1 | 28-Aug-2024 | 31-Dec-2028 | #VALUE! |
| Industrial minerals / glacial rock flour |
NATS 2025-13 | Small-scale (§33) | | Greenland | | 1.1 | 1-Jan-2025 | 31-Dec-2029 | #VALUE! | | Ornamental / gem minerals |
Minerals and |
Gems |
MEL 2026-41 | Exploration | Xploration Services Greenland A/S | 63.8 | 25-Mar-2026 | 31-Dec-2030 | #VALUE! |
| Critical / base metals |
NATS 2026-20 | Small-scale (§33) | Firefly Gems | 1.0 | 11-May-2026 | 31-Dec-2030 | #VALUE! | | Ornamental / gem minerals |
Source: Government of Greenland Mineral Resources Authority, active mineral licenses register, retrieved 23 July 2026; Exploitation license (§16) register.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 151 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Source: Mineral License and Safety Authority Greenland, Online Applications Portal (accessed 2026/07/23)
20.2 White Mountain Anorthosite Mine (Lumina Sustainable Materials A/S) - Closest Operating Mine (MIN 2015-39)
The closest operating mine to the Sarfartoq Project, and the only exploitation license within the 150 km radius, is the White Mountain (Qaqortorsuaq) anorthosite mine held by Lumina Sustainable Materials A/S (formerly Hudson Greenland A/S) under Mineral Exploitation License 2015-39. The mine is located on the north side of Kangerlussuaq Fjord approximately 80 km southwest of Kangerlussuaq airport, some 37 km north of ST1 at Sarfartoq.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 152 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Lumina is one of only two active mining operations in Greenland as of mid-2026 (the other being the Nalunaq gold mine operated by Amaroq Minerals A/S in South Greenland). The company is owned by Cordiant Capital (Montréal) and Apex Asset Management (Switzerland), with corporate management based in Nuuk. The exploitation license was granted on 22 September 2015 for an initial 30-year term, extendable by an additional 20 years under the Mineral Resources Act.
Anorthosite is a calcium-rich feldspar mined for use in fibreglass manufacture, industrial paints and as a substitute alumina feedstock. Reported production is approximately 200,000 t/year, exported by bulk carrier from a dedicated ship-loading facility on Kangerlussuaq Fjord to customers in North America, Europe and Mexico. The White Mountain operation is directly relevant to the Sarfartoq Project as a regional precedent because:
it operates in the same fjord system that GRML has identified for potential product export logistics, providing a documented operating precedent for winter/summer shipping windows, ice management and port operation in Kangerlussuaq Fjord;
it is the only anorthosite mine in West Greenland and demonstrates that a §16 exploitation license in the region has proceeded through the full permitting cycle (EIA, SIA and Impact Benefit Agreement) under the Mineral Resources Act; and
The White Mountain deposit is a Palaeoproterozoic anorthosite intrusion and is not geologically analogous to the carbonatite-hosted REE mineralization at Sarfartoq; its commodity, mineralogy and processing route are unrelated.
20.3 Immediate Neighbour - Arcticulture ApS (MEL 2024-128)
The nearest exploration license to Sarfartoq is MEL 2024-128 held by Arcticulture ApS, granted on 28 August 2024 and covering approximately 29 km² at the head of Kangerlussuaq Fjord, some 36 km east of the ST1 zone. Arcticulture is a Danish Greenlandic company established to develop industrial minerals in Greenland; the Kangerlussuaq license is being investigated in parallel with the company's separate licenses for glacial rock flour (kaolinitic silt) at Marraq in Nuuk Fjord.
The Arcticulture license lies outside the Sarfartoq drainage basin and is separated from MEL 2020-32 by ice-free terrain. There is no known geological, hydrological or logistical interaction between the two projects; Arcticulture's target commodity is industrial minerals for civil and agricultural end uses, with no reported REE or critical-metal potential.
20.4 Regional Exploration License (Nuuk Region) (MEL 2026-41)
One further active exploration license lies within 150 km of ST1: MEL 2026-41 Xploration Services Greenland A/S (63.8 km², granted 25 March 2026), a reconnaissance-stage license approximately 124 km southwest of ST1 in the Nuuk region. Xploration Services is a Nuuk-based logistics and exploration services company that has historically supported field programs for Anglo American, North American Nickel, Greenland Anorthosite Mining and others. MEL 2026-41 is held in Xploration Services Greenland A/S its own name. The target commodities have not been publicly disclosed.
20.5 Small-scale (§33) Licenses (NATS 2025-13 and NATS 2026-20)
Two active small-scale licenses (NATS 2025-13 and NATS 2026-20) lie within 150 km of ST1. Each covers a fixed area of approximately 1 km² under section 33 of the Mineral Resources Act (MRA §33 guidelines) and is held by a Greenlandic resident for ornamental and semi-precious mineral collection. Small-scale licenses do not confer any
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 153 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
right to industrial mineral exploitation and, by law, cannot be granted for radioactive minerals. They have no bearing on the Sarfartoq Project.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 154 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
21.0 OTHER RELEVANT DATA AND INFORMATION
Greenland Mines Ltd. views the Sarfartoq Rare Earths Project as a material Nd-Pr-focused rare earth asset within its portfolio and as a key element of its strategy to develop critical mineral projects in the North Atlantic region.
This Technical Report Summary has been prepared in connection with Greenland Mines Ltd.’s acquisition of the mineral exploration license MEL 2020-32 covering the Sarfartoq project from Neo North Star Resources Inc., through which the registrant will hold 100% of the exploration mineral rights to the Sarfartoq Project, subject to customary regulatory approvals as described in Section 3 and Section 25.
The qualified persons are not aware of any additional relevant technical data or information that is material to the value of the Sarfartoq Project and that is not disclosed in this Technical Report Summary. In their opinion, all scientific and technical information necessary to provide a complete and balanced presentation of the property, in accordance with subpart 1300 of Regulation S-K, is contained in Sections 1 through 20 and 22 through 25 of this report.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 155 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
22.0 INTERPRETATION AND CONCLUSIONS
Geosim has prepared a Mineral Resource Estimate update for the ST-1 Zone of the Sarfartoq Project. The following observations and conclusions were drawn:
The ST1 Zone is associated with coarse grained ferrocarbonatite bodies composed mostly of ankerite, ferrodolomite, siderite, K feldspar, barite and pyrite. The REE are associated with hematite and ankeritic-calcitic masses containing complex aggregates of fine-grained barite, apatite, strontianite, and REE minerals including bastnäsite, synchysite, and monazite identified with various microanalytical techniques.
The adequacy of sample preparation, security and analytical procedures are sufficiently reliable to support an indicated and inferred mineral resource estimation, and that sample preparation, analysis, and security are generally performed in accordance with exploration best practices.
The ST-1 resource estimate is based on analytical data from 94 core holes representing 23,094 m of drilling carried out between 2009 and 2023.
Statistical analysis of REO grade distribution indicates that cutting or capping of high grades is not warranted.
The SCC is mineralized across the entire extent of the complex and large areas remain to be drill tested. It is possible that there will be additional bodies discovered similar to the ST1 Zone found as exploration activities continue.
Metallurgical testing completed to date indicates that Sarfartoq rare earth mineralization is amenable to beneficiation by flotation followed by hydrometallurgical extraction. Mineralogical studies identified a complex and variable assemblage of REE-bearing minerals, which was found to be a primary factor influencing metallurgical performance. Flotation was identified as the most effective beneficiation method evaluated. The best flotation performance was achieved using hydroxamate-based collector systems, elevated pulp temperatures, fine grind sizes, and sodium fluorosilicate-based depressant schemes. Under optimized conditions, the ST1 Composite produced concentrates grading approximately 19-20% TREO at recoveries of approximately 57-58%.
Hydrometallurgical test work demonstrated that high REE recoveries can be achieved from flotation concentrates. Roasting followed by hydrochloric acid leaching and acid baking followed by leaching were identified as the most promising extraction routes, with recoveries exceeding 90% for both LREEs and HREEs under selected test conditions. Although the results are encouraging, the test work remains at a bench-scale and scoping level. Further variability testing, flowsheet optimization, and pilot-scale evaluation are recommended to confirm metallurgical performance across the range of mineralization represented by the current Mineral Resource.
Areas of uncertainty that may materially impact the Project's potential economic viability or continued viability include:
Commodity price assumptions
Assumptions that all required permits will be forthcoming
Metallurgical recoveries
Mining and process cost assumptions
Ability to obtain regulatory approvals to construct and operate a mine
There are no other known material factors or issues that materially affect the Project other than normal risks faced by mining projects in Greenland in terms of environmental permitting, taxation, socio economic, marketing, and political factors. The author is not aware of any known legal or title issues that would materially affect potential economic viability.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 156 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
23.0 RECOMMENDATIONS
Based on the exploration work conducted in 2023 and on the conclusions presented above, the main recommendations are as follows:
Conduct a mineralogy study to create a three-dimensional mineralogical variation model across the ST1 resource to direct continued metallurgical test work and provide a framework for the mineralogical characterization of ST1 resource expansions and of other targets.
Continue bench scale metallurgical studies on the ST1 resource with a focus on increasing the grade and recovery of REE mineral concentrates and adapting to mineralogical variations of the system.
Continued drilling at ST1 to expand the resource and delineate higher REE grades and more favorable REE distributions.
Continued drilling between the ST1 and ST40 Zones to delineate higher grade REE mineralization there, either as a satellite resource or an extension of the ST1 resource.
Complete additional exploration drilling on other REE targets around the 32 km outer ring structure of the SCC.
Current underground mining cost parameter is conceptual and requires refinement based on a underground mining method preferred for this orebody and site conditions. It is recommended to conduct an underground mining method evaluation to refine the underground mining costs and revise both the underground mining scenario and the hybrid mining scenario.
Conduct a revised technical assessment, including updated resource estimates, metallurgical test work, cost estimates, forecasted REE prices, geotechnical stability analysis, hydrogeology, water management and a comparative assessment of open pit, underground, and combined mining development scenarios to identify the preferred development option.
Begin Prefeasibility Studies as soon as possible.
Continue Environmental Impact Assessment studies necessary to apply for an exploitation license.
Continue Social Impact Assessment studies necessary to apply for an exploitation license.
Begin Archeological Studies in conjunction with local experts.
In addition, the following work is recommended to further advance the understanding of the Sarfartoq rare earth mineralization and its processability, and to support future engineering and project development studies:
Additional comminution characterization and grinding optimization are recommended to support development of the crushing and grinding circuit.
Conduct additional mineralogical characterization of flotation concentrates and process streams to improve understanding of REE-bearing mineral occurrence, deportment, and losses to tailings
Complete additional variability flotation testing on representative samples across the Mineral Resource to better define the impact of mineralogical variability on beneficiation performance.
Continue optimization of the flotation flowsheet, with particular emphasis on improving rejection of carbonate and apatite gangue minerals and increasing concentrate grade while maintaining acceptable rare earth recoveries.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 157 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Advance hydrometallurgical investigations on flotation concentrates, focusing on the most promising flowsheets identified to date, including roast-leach and acid bake-leach processing routes.
Evaluate opportunities to reduce reagent consumption and improve process economics through optimization of roasting, acid baking, leaching, and residue treatment conditions.
Complete integrated beneficiation and hydrometallurgical test work programs to establish overall rare earth recovery and support future process design and engineering studies.
Conduct precipitation test work to evaluate the production of a mixed rare earth carbonate (MREC) product from leach solutions and to determine rare earth recovery, impurity rejection, and final product quality
Consider pilot-scale testing of the preferred beneficiation and hydrometallurgical flowsheets following completion of bench-scale optimization and variability test work.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 158 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
24.0 REFERENCES
Aber Resources Ltd. 1997. A Report on the 1996 West Greenland Diamond Project, Southern West Greenland,
Exploration License # 29/96, Areas between Nuuk and Kangerlussuaq. Prepared and submitted on behalf of Platinova A/S. GEUS Report file No 21505.
Agricola Mining Consultants Pty Ltd.. 2026. Memorandum to the Independent Mineral Resource Consultants
Price Deck and Cut-Off Grade Parameters (RPEEE Inputs), Sarfartoq Nd Pr Rare Earth Element Project, West Greenland ST1 Zone. Author(s) Castle, M.J. Dated June 23, 2026.
Bach, L. et al. Guideline for collection of environmental samples to the Greenland mineral resources
environmental sample bank, Danish Centre for Environment and Energy (DCE), 2023, updated 2026.
Barnes, G.B. 1999. Niobium Mine project, Sarfartoq (West Greenland) Exploration Report (volume 1-3).
Unpublished Report for New Millennium NL, March 1999.
Barnes, G.B. 2000. Exploration License 25/96 Sarfartoq Niobium project, Annual Report Exploration Report
(volume 1-2). Unpublished Report for New Millennium NL, February 2000.
Barnes, G.B. 2001. Exploration License 25/96. Annual Report March 2001. Unpublished Report prepared for New
Millennium Resources NL, March 2001
Barnes, G.B. 2002. Exploration License 2001/05. Annual Report March 2002. Unpublished Report prepared for
New Millennium Resources NL, March 2002.
Bedini, E., 2009. Mapping lithology of the Sarfartoq carbonatite complex, southern West Greenland using HyMap
imaging spectrometer data. In remote Sensing of the environment, 113, pp. 1209-1219.
Berger, V.I.B., Singer D.A. and Orris, G.J., 2009. Carbonatites of the world, Explored Deposits of Nb and REE
Database and Grade and Tonnage Models. USGS Open File Report 2009-1139.
Broad, P., Robinson, J., Coley, D., Simpson, R.G., and Ramsey, D.R.P. 2011. Preliminary Economic Assessment
on the Sarfartoq Rare Earth Element Project, Greenland. Prepared by Tetra Tech - Wardrop for Hastings Resources Inc.
Chung, L. E. 1996. DIGHEMV Survey for Softrock Petroleums Ltd., Sarfartoq and Kangerlussuaq Areas,
Greenland. Report #764. Unpublished report prepared for Softrock Petroleums, Ltd.
Druecker, M.D. 1990. Additional information on the Sarfartoq Project. Unpublished report prepared for Hecla
Resources February 1990.
Druecker, M.D. 1990. Sarfartoq Carbonatite Complex, summary report. Unpublished report prepared for Hecla
Resources February 1990
Druecker, M.D. and Simpson, R.G. 2011. Amended Technical Report on the Sarfartoq Project, West Greenland.
Prepared for Hudson Resources Inc.
Druecker, M.D. and Simpson, R.G. 2012. 2012 Technical Report on the Sarfartoq Project, West Greenland,
License No. 2010/40. Prepared for Hudson Resources Inc.
Druecker, M.D. and Simpson, R.G. 2012. Technical Report on the Sarfartoq Project, West Greenland. Prepared
for Hudson Resources Inc.
Druecker, M.D. and Simpson, R.G. 2012. Technical Report on the Sarfartoq Project, West Greenland. Prepared
for Hudson Resources Inc. Dated: Apr 26, 2012.
Felsman, J.M., Simpson, R.G., Goode, J.R., and Druecker, M.D. 2025. Internal Update of the Technical Report on
the Sarfartoq Project, West Greenland. Effective Date: April 4, 2025.
Giovenazzo, D. 2010. Sarfartoq REE Project, Technical Report of Exploration Work, 2009, Sarfartoq License
2006/03, West Greenland. Prepared for Hudson Resources Inc.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 159 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
Government of Greenland Mineral Resources Act (Inatsisartut Act No. 7 of 7 December 2009, as amended);
Guidelines for Preparing an Environmental Impact Assessment Report for Mineral Exploitation in Greenland, 2nd edition (MRA 2015); Guidelines for Social Impact Assessment (govmin.gl).
Government of Greenland Rules for field work and reporting regarding mineral resources (excluding
hydrocarbons), Ref. No. 69.03.20+01, November 2000.
Government of Greenland Standard Terms for Exploration Licenses for Minerals (Excluding Hydrocarbons),
govmin.gl.
Haxel, G.B. 2005. Ultrapotassic Mafic Dikes and Rare Earth Element and Barium-rich Carbonatite at Mountain
Pass, Mojave desert, Southern California: Summary and Field trip localities. USGS Open File report 2005-1219, 30pp.
High-Sense Geophysics Limited 1999. Final Logistics and Interpretation Report for a Combined Helicopterborne
Magnetic Survey over the Sisimut and Sarfartoq Permits, Greenland. Unpublished report for Monopros Limited.
Kormos, L. 2012. Mineralogical analysis of three polished thin sections and one sized sample, Sarfartoq
carbonatite complex. Unpublished report by Xstrata Process Support for Hudson Resources Inc.
Kresten, P., 1983, Carbonatite nomenclature: Geologishe Rundschau, v. 72, no. 1, pp. 389 395.
Larsen, L.M. & Rex. D.C. 1992. A review of the 2500 Ma span of alkaline-ultramafic, potassic and carbonatitic
magmatism in West Greenland. In Lithos, 218 pp. 367-402
Le Couteur, P. C. 2009. Petrographic report on thirteen surface rocks samples from the Sarfartoq Carbonatite
complex, Western Greenland. Unpublished report for Hudson Resources Inc.
Le Couteur, P. C. 2009. Petrographic report on three carbonatite core samples from the Sarfartoq property, West
Greenland. Unpublished report for Hudson Resources Inc.
Le Couteur, P. C. 2010. Petrographic report on eleven core samples from the Sarfartoq carbonatite complex,
Western Greenland. Unpublished report for Hudson Resources Inc.
Le Couteur, P. C. 2011. Addendum magnetic test of 2011 bulk sample. Unpublished report for Hudson Resources
Inc.
Le Couteur, P. C. 2011. Magnetic test of 2011 bulk sample. Unpublished report for Hudson Resources Inc.
Le Couteur, P. C. 2011. Petrographic report on three random samples of the 2011 rare earth bulk sample from the
Sarfartoq carbonatite complex, Western Greenland. Unpublished report for Hudson Resources Inc.
Le Maitre, R.W. 2003. Igneous rocks: A classification and glossary of terms 2nd edition, recommendation of the
international Union of geological Science Subcommission on the systematic of Igneous rocks. ed by R.W. Le Maitre, published by the Press syndicate of the University of Cambridge, 136pp.
Mariano, A.N. 1988. Some further geological applications of cathodoluminescence. Cathodoluminescence of
Geological Materials. Marshall, D.J., pp. 94-123. Unwin Hyman Ltd, London.
Mariano, A.N. 2011. REE mineral analysis on two samples of drill core from Sarfartoq, Greenland. Unpublished
report for Hudson Resources Inc.
Mariano, A.N. and Mariano, A. Jr. 2023. Sarfartoq limited mineralogical investigation. Unpublished report for J. R.
Goode and Associates.
Mariano, A.N. and Mariano, A. Jr. 2023. Sarfartoq Limited Mineralogical Investigation. Unpublished report for J. R.
Goode and Associates. Dated: Mar 21, 2023.
Maynard, A.L. 2001. Independent appraisal of the Sarfartoq Niobium project, Exploration License EL2001/05,
Western Greenland. Unpublished report prepared for New Millenium Resources, found in Appendix 11 of the 2002 annual report NMR.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 160 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
Morton, N. and Grammatikopoulos, T. 2013. An investigation by high definition mineralogy into the mineralogical
characteristics of two REE carbonatite samples from the Sarfartoq rare earth deposit. Unpublished report by SGS for Hudson Resources Inc.
O’Connor, K. 1999. Project Report, High Sensitivity Aeromagnetic Survey, Southern West Greenland. Report by
Sander Geophysics Limited for GEUS. GEUS Report file No. 21913.
Richardson, D.G. and Birkett, T.C 1996. Carbonatite associated Deposits. In Geology of Canadian Mineral types
(ED) O.R. Ekcstrand, W.D. Sinclair, and R.I. Thorpe. Geological survey of Canada, no.8 pp. 541-558.
Rollinson, H. 1993. Using geochemical data: evaluation, presentation, interpretation. Published by Pearson
Education Limited. 352pp.
Secher K. 1976, Airborne radiometric survey between 66° and 69°N, Southern and central West Greenland.
Rapp. Gronlands Geol. Unders , 80, pp. 65-67
Secher, K and Larsen, L.M. 1980. Geology and mineralogy of the Sarfartoq carbonatite complex, southern West
Greenland. In Lithos, 13, pp. 199-212.
Secher, K. 1986. Exploration of the Sarfartoq carbonatite complex, southern West Greenland. In rapport
Gronlands Geologiske Undersogelse, 80, pp. 65-67.
SGS Canada Inc. 2019. An Investigation into Scoping Level Rare Earth Leaching Test work on Carbonatite
Samples from the Sarfartoq Deposit prepared for Hudson Resources Inc.; Project 13594-003 Final Report. Dated: Dec 03, 2019.
SGS Canada Inc. 2026. An Investigation into Beneficiation Test work on Drill Core Samples taken from the
Sarfartoq Deposit prepared for Neo North Star Inc.; Project 19446-02A Final Report. Dated: Apr 01, 2026.
Tetra Tech Wardrop 2011. Technical Report on the Preliminary Economic Assessment on the Sarfartoq Rare
Earth Element Project, Greenland. Prepared for Hudson Resources Inc. Dated: Nov 25, 2011.
Townend, R. 1998. EPMA analyses of pyrochlore and ilmenorutile. Unpublished report for Barnes and Associates.
Tukiainen T. 2002. Mapping of kimberlitic rocks in central Wesst Greenland using airborne hyperspectral data.
GEUS Report Fie No. 23801.
UNESCO World Heritage Centre Aasivissuit Nipisat: Inuit Hunting Ground between Ice and Sea (inscribed
2018), Qeqqata municipality, West Greenland.
Uranium Act Inatsisartut Act No. 20 of 1 December 2021.
Woodbury, M. 2003. Sarfartoq Exploration License EL2001/05 March 2003. Annual Report. Prepared by New
Millennium Resources.
Worley Chemicals and Minerals. 2001. Greenland Niobium Project: Feasibility study Phase 1. Unpublished report
prepared for New Millennium Resources NL.
WSP Danmark A/S Sarfartoq Project Environmental Baseline Report 2023, WSP Project No. 22003654, 12
December 2023 (confidential).
WSP Danmark A/S Sarfartoq Project Environmental Baseline Survey 2026, WSP Project No. 22008569, 17
June 2026 (confidential).
XPS Expert Process Solutions 2023. Mineralogical Characterization of Sarfartoq REE Samples Summary of
Results. Unpublished report for J. R. Goode and Associates. Dated: Mar 31, 2023.
XPS Expert Process Solutions 2023. Mineralogical Characterization of Sarfartoq REE Samples PXRD and
Rietveld Refinement Addendum. Unpublished report for J. R. Goode and Associates. Dated: Jun 09, 2023.
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 161 | |
| | | | | |
SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE | |
25.0 RELIANCE ON INFORMATION PROVIDED BY THE REGISTRANT
In preparing this Technical Report Summary, the qualified persons have relied, to the extent permitted under Item 1302(f) of Regulation S-K, on information and documentation provided by Greenland Mines Ltd. (the registrant) in respect of certain matters that are outside the qualified persons’ areas of expertise.
The qualified persons have relied on information provided by the registrant regarding:
Corporate transactions and ownership: Details of Greenland Mines Ltd.’s definitive agreement to acquire Neo North Star Resources Inc., the Structure of the transaction, and the registrant's expectation that, upon completion of customary closing conditions and approval by the Government of Greenland, it will indirectly hold 100% of the mineral rights to the Sarfartoq Project through Qaasuitsup Ulloriaa.
License status and legal/title matters: The current status of exploration license MEL 2020-32, including grant and transfer dates, license expansion, expiry and renewal rights, and confirmation that the license is in good standing under the Greenland Mineral Resources Act, together with the registrant's confirmation that there are no undisclosed encumbrances, liens, or material disputes affecting the mineral rights other than those described in Sections 3 and 20.
Permitting framework and regulatory approvals: The description of the applicable regulatory framework, including the requirements for environmental and social impact assessments, public consultation, and Government of Greenland approvals under Section 69 for indirect transfer of mineral rights, and the status of the registrant's applications and approvals as of the effective date.
Commercial arrangements and market context: The existence and principal terms, as publicly disclosed by Greenland Mines Ltd., of the memorandum of understanding providing for a potential offtake arrangement covering a significant portion of future concentrate production from the Sarfartoq Project, together with the registrant's description of its broader corporate strategy for critical mineral development and _ potential downstream processing.
The qualified persons have reviewed this information for internal consistency and reasonableness but have not independently verified legal, title, corporate, or contractual matters, nor have they conducted legal due diligence in respect of permitting or regulatory approvals. The qualified persons are not experts in law, permitting, or corporate finance and, therefore, express no opinion on the legal validity or enforceability of licenses, agreements, or approvals described in this Technical Report Summary.
Except as explicitly noted above, the qualified persons have not relied on information provided by the registrant for the scientific and technical data, including geological information, exploration results, metallurgical test work, and mineral resource estimates, which have been obtained from primary technical sources and independently reviewed by the qualified persons. Subject to these limitations, the qualified persons consider the information provided by Greenland Mines Ltd. to be reasonable for the purposes of this Technical Report Summary and appropriate to rely upon under Item 1302(f).
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 162 | |
| | | | | |
| SARFARTOQ RARE EARTHS PROJECT: MINERAL RESOURCE ESTIMATE FILE: FILE: 704-ENG.VMIN03496-01 | JULY 31, 2026 | ISSUED FOR USE |
26.0 DATE AND SIGNATURE PAGES
This TRS titled “S-K 1300 Technical Summary Report: Sarfartog Rare Earths Project, West Greenland” with the date issues of July 31, 2026, was prepared and signed by the following authors:
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
QP/Consulting Firm | | | Responsible Sections | | | Signature | | | Date | |
Tetra Tech Canada Inc. | Sections 1.4, 10.0 and parts of 1.6, 1.7, 22, 24 related to mineral processing and metallurgy. | “signed” Hassan Ghaffari, P.Eng., M.A.Sc. |
| July 31, 2026 |
|
GeoSim Services Inc. | All other sections of the report not listed above. | “signed” Ronald G. Simpson, P.Geo | July 31, 2026 |
| | | | | | | | |
REP_Sarfartoq_MRE_GRML_IFU_16Aug26.docx | 163 | |