Earnings Call Transcript

Kinetik Holdings Inc. (KNTK)

Earnings Call Transcript 2022-09-30 For: 2022-09-30
View Original
Added on May 02, 2026

Earnings Call Transcript - KNTK Q3 2022

Operator, Operator

Good morning and thank you for attending the Kinetik Third Quarter 2022 Results Call. All lines will be muted during the presentation portion of the call with an opportunity for questions and answers at the end. I'll now like to pass the conference over to your host, Maddie Wagner, with Kinetik. Thank you. You may proceed.

Maddie Wagner, Host

Thank you. Good morning and welcome to Kinetik's third quarter 2022 earnings conference call. Here with me is our President and CEO, Jamie Welch; as well as Matt Wall, our COO; Anne Psencik, our Chief Strategy Officer; Steve Stellato, our CAO; Todd Carpenter, our General Counsel; Trevor Howard, our VP of Finance; and Kris Kindrick and Tyler Milam, our VPs of Commercial. The press release we issued yesterday, the slide presentation and access to the webcast for today's call are available on our website at www.kinetik.com. Before we begin, I would like to remind all listeners that our remarks, including the question-and-answer section, will provide forward-looking statements and actual results could differ from what is described in these statements. These statements are not guarantees of future performance and involve a number of risks and assumptions. We may also provide certain performance measures that do not conform to US GAAP. We provided schedules to reconcile these non-GAAP measures as part of our earnings press release. After our prepared remarks, we will open the call to Q&A. With that, I will turn the call over to Jamie.

Jamie Welch, CEO

Thank you, Maddie. Good morning everyone, and thank you for joining us today. We reported our third quarter 2022 results yesterday afternoon, and I’m pleased to share with you this morning that we reported a record quarter with respect to both process gas volumes and adjusted EBITDA. In this first year post-merger, we have continued to improve quarter-over-quarter across all facets of our business as we realize integration synergies, optimize our system and grow customer relationships. Having grown 1.5 billion cubic feet per day through the end of September, the Permian Basin remains on track to grow natural gas volumes by two billion cubic feet per day exit to exit in 2022, with consultants expecting another two cubic feet per day of growth in 2023. Drawing down further, we estimate that the Delaware basin accounts for well over half of total Permian supply growth. Moving a bit further downstream, we are beginning to see tightness at the long haul residue gas transport outlets earlier than expected. In October, approximately 1.3 billion cubic feet per day of takeaway capacity was taken offline for routine maintenance, which resulted in Waha moving into negative price territory. A stark reminder of the 2017 to 2020 Waha basis collapse. This recent event reinforced to us a few things. First, Permian natural gas takeaway appears to be fairly balanced and Waha pricing is volatile when utilization rates are this high. This point is further reinforced when looking at northbound natural gas volumes historically viewed as a transport avenue of last resort, which in September and October hit levels not seen since the in-service of the Permian Highway Pipeline almost three years ago. As expected, the immediate response is already underway with Permian processes largely switching plants into recovery. With the takeaway supply-demand equation fairly balanced further supply growth will likely only exacerbate discounted Waha prices. Second, the event highlighted how critical it is to differentiate ourselves from our peers by offering our customers integrated solutions. Even in the face of inflation and weaker commodity prices, the Permian Basin continues to grow and supply both the US and the world's energy needs. The Permian rig count has remained steady at roughly 340 to 350 rigs since May, despite a 20% reduction to WTI crude since then. In the third quarter, we at Kinetik averaged approximately 17 rigs on our system and had approximately 70 wells turned to sales. We have continued to see a steady ramp of activity over the course of this year in a basin where processing capacity and pipeline egress to the Gulf Coast are becoming tighter. Kinetik stands apart. As mentioned earlier, we are able to offer our customers processing capacity today and an evacuation route for residue gas to the Gulf Coast. As we move into 2023 and beyond, this only becomes more meaningful. Similar to our first and second quarter earnings results, many of the figures today will be reported on a pro forma basis. Assuming the business combination between our predecessors BCP and Altus closed on January 1st of this year, we believe it is more reflective of our actual results and provides our investors with more meaningful information and helps to reconcile our 2022 full year guidance on page three. Moving to our recent highlights, we reported a record adjusted EBITDA of $212.4 million for the third quarter. This was driven by increased gas volumes across our midstream logistics segment and stronger than expected contributions from our pipeline transportation segment. Two previously announced gas gathering and processing agreements with large cap investment grade counterparties began on October 01, also beginning November 1st. We commenced our new gathering and processing dedication with Apache for its DL acreage in Central Reeves County. We have continued to identify both organic and inorganic growth opportunities. Year to date, we have added six new customers to our system, representing a 20% increase in overall customer count. In the third quarter alone, we added three new private customers. Not only have we added new customers, but we have expanded our relationships with existing ones. As I just mentioned, we have established relationships with several new private producers along our system. This is a net positive for us as these producers will pull inventory forward, accelerating development on our system into 2023. These teams have proven track records and we look forward to being part of their emerging growth story. In September, we acquired Brandywine NGL. This acquisition affords Kinetik greater control over system NGLs and provides interconnectivity to downstream natural gas liquids outlets. Kinetik's NGL 250,000 barrel per day intra-basin NGL pipeline system is comprised of the dew point and Brandywine assets. It is wholly owned and operated by Kinetik. Progress continues on the 550 million cubic feet per day expansion of PHP. The required compression equipment has been secured and preconstruction activities are well underway to secure construction contractors land and other associated materials. The project remains on schedule to be in service by November 1st, 2023. On page four in the third quarter, we achieved a new quarterly record for gas processed volume at 1.2 billion cubic feet per day, representing a 4% increase year over year. Crude volumes gathered were approximately flat year over year at 67,000 barrels per day. Although we benefited from 25 wells turned in line on our crude system in the third quarter, that drove an 8,000 barrel a day increase in October over those third quarter average levels, water gathered volumes were down approximately 11% quarter over quarter simply due to producer recycling in July from our largest customer. The diamond cryo expansion of 120 million cubic feet per day of incremental capacity is on schedule for completion in the first quarter of next year. We have procured the long lead time equipment and kicked off construction in June. We completed the super system interconnect connecting the legacy BCP and AL systems. The interconnect has allowed us to access latent capacity at Diamond Cryer and utilize the SR technology available at Diamond Cryer to further enhance our NGO recoveries, achieving up to 99% ethane recovery. An additional benefit to the system interconnect and latent capacity is that we were recently able to temporarily bring several BCP facilities offline to perform routine maintenance without curtailing any process gas volumes for our customers. This year, we will have replaced or avoided the addition of 32,000 horsepower of rental compression with 10 company owned surplus compression units annualized. This translates to over $5 million of annual operating expense savings in 2023. We will harvest additional synergies with the installation of own surplus front end aiming treating equipment at the BCP complexes and continued compression relocation projects. On page four, on financials, we reported adjusted EBITDA of $212.4 million. We generated distributed cash of $158 million and free cash flow of $34 million. On October 19th, we declared a $0.75 per share quarterly cash dividend pro forma the June two-for-one stock split, representing a dividend coverage ratio of 1.5 times. We exited the quarter with a four times leverage ratio and remained confident in our ability to achieve a long-term leverage target of 3.5 times. A total capital expenditure for the quarter were $145 million, $84 million of which was associated with a pipeline transportation segment. On Page four, we have provided some segment specifics. Our midstream logistics segment generated adjusted EBITDA of $137.5 million in the third quarter. Year-over-year, that segment pro forma adjusted EBITDA is up 25%. In the third quarter, we realized our 2022 EBITDA synergy target of $25 million. This was achieved three months ahead of schedule and as a result, we're increasing our 2022 synergy capture guidance to over $30 million as shown on Page seven. Shifting to our pipeline transportation segment, we had a record quarter and beat our internal expectations. We generated an adjusted EBITDA of $78.7 million in the quarter. Moving to Pages five and six, the strong third quarter and the fourth quarter outlook gives us confidence to reiterate our adjusted EBITDA and capital expenditure guidance. Our adjusted EBITDA guidance is $820 million to $840 million with $830 million at the midpoint. Over the course of this year, we have realized adjusted EBITDA growth quarter over quarter in the fourth quarter. We have a number of new gathering and processing agreements commencing. Our two previously announced gathering and pricing agreements with large cap investment-grade parties commenced on October 1st and our Apache DXL agreement started last week on November 1st. There are also several other new contracts with private producers that have or are about to commence. We will continue to further capture additional integration and cost synergies. Offsetting the sequential improvement in EBITDA is slightly weaker natural gas and NGL prices. Our capital expenditure guidance remains unchanged at $280 to $300 million. This includes $170 to $190 million of midstream logistics capital and $110 million of pipeline transportation capital. Our projects are both on budget and on schedule and are insulated from the inflationary environment as long lead-time equipment and materials have been secured within our pipeline transportation segment. The $110 million guidance includes our total funding commitment to the PHP expansion for this year, the Brandywine acquisition, and early spend on Delaware Link. Our producer customers are currently in their budgeting season and as a result, we will provide our 2023 EBITDA and capital expenditure guidance in February when we report our fourth quarter and full year 2022 results. If you go to page nine, I'd like to provide a few updates before we move to Q&A. As we previously announced, we completed our comprehensive $3 billion refinancing in June. Most recently, we have locked in a fixed rate on our term loan A to May 2023, specifically $2 billion. The full amount of our term loan A bank facility is now fixed at a SOFR rate of 4.45%, and from May 2023 through May 2025, a billion dollars is fixed at a SOFR rate of 4.46%. These actions taken together reduce our floating rate exposure to less than 15% of total current debt outstanding to May of next year, and then approximately 40% thereafter through the maturity of the term loan. We just marked the one-year anniversary of our merger announcement. We commemorated this event at the New York Stock Exchange on October 24th with members of management and the board at the opening bell ceremony. Looking back, we have remained steadfast and committed to executing upon the financial goals and strategy presented a year ago. We completed our 2022 capital allocation goals earlier this year, and we remain confident in achieving our 3.5 times leverage target and securing investment-grade ratings by year end 2023. Thank you again for your continued support and for joining us this morning. And with that, I'd like to open the lines for Q&A.

Operator, Operator

The first question is from the line of Jeremy Tonet with JPMorgan. You may proceed.

Jeremy Tonet, Analyst

Thanks for all the details today. I really appreciate going through the business and Permian outlook and just wanted to build on a little bit more as far as Permian takeaway is concerned. A few questions there, I guess, and just, with PHP coming online, is that a distinct date where everything starts up day one or could it be some of it de-serving volumes partial in service earlier than that? And if we think about later data takeaway, how would you think about the chances of GCX expansion versus Permian Pass versus another project coming to fruition?

Jamie Welch, CEO

You ask all the questions that everyone is thinking about. Let me address PHP. The short answer is there will always be a time when there might be some additional capacity, but the specifics on volume and timing are still to be determined. It depends on when we complete the mechanical work and finalize the tie-ins. So, it's a bit uncertain. We'll keep you updated, and I’m sure our team will too, as we aim for the November 1 in-service date. There could be potential upside, but at this moment, we can't accurately quantify it. Regarding overall takeaway capacity, we expect the Whistler expansion to take place next quarter. Then, with PHP coming online on November 1, the total of these two projects will provide just over a Bcf. Moving into 2024, we have additional developments that will be interesting. If the forecasts are correct and we achieve two SF a day of growth this year and two BCF of gas growth next year, it could really spur conversations about additional takeaway capacity, whether that involves Warrior or any other options. There are many projects currently looking to be commercialized, but it's about waiting for the right moment when customers can clearly see the benefits. I found it interesting to hear from one of our valued clients, Permian Resources, who noted the negative Waha price in October was surprising, reminiscent of the 2017 to 2020 period. This could potentially reignite commercial activities. As for its impact on GCX, it's tough to say. I'm uncertain if a new 42-inch pipeline is the best solution. Many producers might believe that having more capacity is beneficial compared to relying on the same infrastructure with higher throughput. It's difficult to make a definitive judgment on this.

Jeremy Tonet, Analyst

Got it. That's helpful. Appreciate your thoughts as always there. And turning to '23 and not running front running guidance there, but just wondering any incremental breadcrumbs you can leave for us as far as how EBITDA could shake out a lot of moving pieces there with growth in the new projects, what have you, but wanted to see even with commodity price sensitivity, I guess how you see direct commodity price sensitivity evolving over time or any thoughts to share with us on how that could impact '23?

Jamie Welch, CEO

So interestingly enough, I think the over, as we've been very consistent, you're in a commodity price environment where traditionally it's, you have migrated from p or pol contracts to traditional fixed fee. That's not to say that there's not some commodity upside with overall system performance, plant performance, the SRX technology, 99% ethane, that is state of the art but the overall percentage of that as a contribution relative to the overall base fee that you would get from a customer is going to be on the lower end. And I think as we think about the overall expectation, our migration will be to more fixed less, pop and therefore less commodity sensitivity going forward. And certainly the pipeline transportation component will also, as that continues to increase, that will continue to decline. The overall contribution factor as we look at 2023 landscape looks like this really good growth, great contracts that are now, you annualized obviously contracts that have started this the last part of 2020 22 and you'll annualize them over 2023, you've got some really good pull-forward growth. I would say the interesting thing is the amount of private activity, I think we've seen what privates can do. We've all lived through this over the last several years where the publics have been very disciplined in their overall capital expenditures and all about returning cash back to shareholders and other stakeholders and the privates really accelerating the inventory and capitalizing on that commodity price windfall. We've got six new customers, three we just signed up this past quarter and we’ve got an accelerant right now going into 23, which is great. The headwind for 23 is commodity prices and whether it's, yeah, what's going to happen is when's Freeport going to come back online? What's going to happen with Waha pricing house is going to look relative to the overall growth because as we said, if you do have two BCF of growth with no incremental capacity until the September and then November, you are, you’ve got two BCF a day theoretically for 2023, and you've got only a BCF coming online as far as takeaway capacity and that being Whistler and then obviously PHP towards the back end of that year of 2023. So, I think there is we've got some really good puts and takes on the expense side, the OpEx side yeah, we’re really being mindful of how we think about compression costs, salaries and benefits, much like the rest of the entire economy are obviously feeling some pressures because we’ve got we’ve got people, obviously thinking about their pocketbook and disposable income and synergies, right? Synergies, that 25 already to be achieved by the third quarter and now increasing guidance for 30, we said originally it was going to be 50 run rate. We said we’re going to significantly beat that. So that 30 is both a pull forward and a, I would say it is a micro snapshot of the potential to significantly increase that 50 million overall target.

Gabe Moreen, Analyst

Hey, good morning everyone. Jamie, maybe if I could continue on the '23 outlook scene just with all the activity and new customers you're signing up. Can you talk about where things stand right now in terms of how you feel about processing capacity utilization, the length of these contracts and whether that gives you visibility, potential further expansions or even new builds? Maybe I'll just see where your thoughts are there.

Jamie Welch, CEO

So I think Gabe, it has not been lost on us as we've seen all of the associated announcements around processing facilities being added late '23 into '24. So there's a little bit of a motto within this organization, which is time is now. We are selling this today, and as I said, the integrated solution is we are a foundation shipper on PHP, we're a foundation shipper, pro forma expansion. We can start as people see what's going on with gas prices and whether they're private or public, there's a reticence to flare. They really want to find economic value for that side of the hydrocarbon stream. So I think it's very clear that we can offer something that differentiates and we've got space today, right? These people are, the privates are focused today and we have capacity to give them today. So it's a very nice marriage. What does that mean as far as how we think about our processing? We're increasing the processing footprint by 120 million cubic feet a day for Diamond. So I'll go from 600 to 720 as of late March of next year, that'd be 2023. And yeah, Gabe and the engineering team have already been looking at the rest of the fleet and we are seeing whether we can get 10% to 20% improvement across our larger cryos, which obviously would also be very low cost and nice immediate upside because we can make it happen immediately. We realize what is important to us. We want to sell out everything we can once we start getting within that 90% zip code looking out sort of six months out at overall processing volumes relative to capacity, that's the point in time you will see us make decisions on what we do next on a processing plant. And just as importantly, where are we going now? I like where exactly do we think we wanted to go, where the puck is going to be, not where it's necessarily at.

Gabe Moreen, Analyst

Thanks Jamie. And then maybe if I could turn to commodity prices and hedges. You mentioned, I think in your answer to Jeremy's question about trying to negotiate contracts to more fixed fee. Is that playing at all on your decision on hedges and just the latest also I guess between ethane rejection or not? Just wondering, the latest thinking is on hedging here.

Jamie Welch, CEO

We've been working on the operational hedging as it relates to 2023. So that would then determine whether we have plans run in recovery or rejection so that we've already been putting in place. As far as other fundamentals on the hedging side, we are looking acutely at all the potential opportunities that present themselves to in fact mitigate their hedging exposure and looking to make sure that we capitalize on what we think makes the most sense relative to our overall supply stack. Meaning how do we think about growth that's coming on with different contracts because not every customer is the same and not every contract's the same. So we've got a lot of internal work going on. Trevor, Ross and Graham working with Annie Penick on the NGL side, we've really been spending a lot of time and effort as we now really get headlong into 2023 activity.

Neel Mitra, Analyst

Hey, good morning. First just wanted to clarify your latent processing capacity going into 2023. Jamie, it sounds like you've landed some private agreements and you haven't necessarily known the full amount. I think the last presentation said you had about half a BCF a day of latent capacity with the diamond cryo expansion included. Can you give us your views on where you'll be in '23 with that with existing customers?

Jamie Welch, CEO

Well I think as we said the 1.5 BCF was a projected viewpoint in the context of the bigger contracts that we had just signed in the first quarter. And with the privates, obviously we can aggregate them, they would obviously take off that remaining half a BCF. I would say in total, I'm looking at Trevor wouldn't be more than a hundred, right? So I think you're looking at about 20% of that further being impacted good contracts, really good contracts from a fee and from an economic margin standpoint. And I think we probably risk those volumes a lot more heavily just because there is a, there's a sense of a little bit of the unknown.

Neel Mitra, Analyst

Got it. Second question you have 56% interest in PHP expansion. I know you've contracted a little bit down with some of your two contracts that you announced earlier this year, but are you able to, to bundle GMP and take away agreements on that expansion going forward? Or are they going to be distinct contracts?

Jamie Welch, CEO

No, we going to, we will, we will bundle it and that was part of the commentary around, in continuing to do more things with our existing customers and some of the things we've done with them on guests on gaining control of their residue gas, which as Neil firsthand, we have a couple of contracts where we do have some take or pay customers that there's one customer in particular that we've now got control of their residue going forward in exchange for which they get some very attractive Gulf Coast pricing.

Neel Mitra, Analyst

Right. And follow up to that, do you see any flow assurance issues this time around in Q2 23? Just with the amount of gas that's coming out in the lack of tickle capacity and the inability for a lot of guys to flare?

Jamie Welch, CEO

No, sorry, I'm just, are you talking about general Permian or are you talking about Kinetik specifically? Look, just given we saw recently and, and if, if supply growth resumes and continues there will, yeah, there's going to be concerns about the ability to actually go and move that gas out of the basin. Yes. but specifically with Kinetik due to our downstream capacity arrangements as well as our marketing arrangements, we do not see a risk. And just further hammering on that point in 2020, before PHP even came online when the basis was blown out, we didn't have any issues actually going physically flowing the gas. It's fair to say, I was going to, Sorry. I was going to say, as I said in my earlier remarks, we just be in recovery, right? And so, there might be an impact in the context of how, what happens with ethane pricing. Sure. but obviously that's one of the first triggers that I would say self-help that you can actually utilize.

Neel Mitra, Analyst

Got it. And if I could just ask us one more on your view of NGL takeaway tightness. We've seen Chin Oak postponed a year Daytona announced on the target system to come on in in 2024. So looks like different systems have different views of tightness. You're obviously involved or could be involved in ownership with both and have capacity in both. What are you seeing in terms of tightness when we need it or if there's pockets that are tighter than others within the Permian?

Jamie Welch, CEO

Look, I would say on the Shino side, we see a more broadly from a market perspective, 2025, we really start to see some very interesting some very interesting elements and affecting the market. And that's when obviously we really do see a need for the incremental takeaway capacity. The Chinook expansion, as Enterprise has said, is ready to go. They are trying to work out phase one, phase two, what does it look like? And they're listening, engaged in conversations with their customers. They're thinking about what they have with their own footprint. They're also talking to us as their partner in the context of trying to work out what it is we want to do. And so I think we saw the Daytona, I think there obviously it's a different discussion and obviously that should obviously gives a course for optimism, I think, around the overall target expectation on volumes and their continued customer growth. So I think that we are, we're okay for now and I think you're okay as you go through next year into 2024 and 2025 is when certainly we think that Chino needs to be in service just given the combined needs of the existing two partners. And we can't really comment on what Tyler is thinking as it relates to the timing on Daytona.

Michael Cusimano, Analyst

Hey, good morning everyone. I wanted to start CapEx for '23. I was hoping you can go through some of the puts and takes there, rolling in from 2022, and how maybe like the Shin Oak delay affects what you were looking for '23.

Jamie Welch, CEO

Shin Oak likely indicates that there will be reduced spending in 2023, which I view positively. We have PHP expansion, so we are addressing the larger budget items. There is also treatment related to the carryover, with a focus on front end surplus at our current BCP sites. This represents a significant capital expenditure in midstream logistics. We have well connects, and we are currently working through the Delaware link, which is fully booked and connects to PHP and its expansion. In terms of the PHP expansion, about 75% of our spending will take place in 2023, as 25% was allocated for this year, with total costs estimated around 4.25 to 4.30 million. Those are some of the larger expenditures. The spending at Shin Oak remains uncertain, but we do anticipate some maintenance costs of around $14.50 million and moderate growth with our overall customer base, which continues to expand. While these are not significant amounts individually, they do accumulate over time.

Michael Cusimano, Analyst

Okay. That's really helpful. And then it seems, many in the industry are pointing to ethane recovery as being the option to free up some gas takeaway, but I'm wondering if you have a view on how that affects ethane markets in Bellevue and if that puts additional pressure there.

Jamie Welch, CEO

All right, I'll let you speak with Anne Psencik, our resident NGL expert, who can share her insights on the FA market.

Anne Psencik, Chief Strategy Officer

It will put some pressure on the FA market just because of the petrochemicals right now are not performing very well. I mean, there's not a lot of demand and with China not pulling like they used to we're going to see pressure on ethane. But I do believe that you'll find that the midstream, the integrated midstream will be able to deal with the ethan that shows up in Mont Bellevue. They'll export it out. I know right now they're full and there's issues with shipping, but all of all of them are working on it to try and make sure that we get more out the market.

Jamie Welch, CEO

But it will put some pressure on pricing.

Unidentified Analyst, Analyst

Hi, good morning. Thanks for time. So you guys move forward on the Brandy Wine and DL acquisition. You're also working on the Delaware Link project. Are there any other opportunities like these around the footprint, either on the bolt-on M&A side or on the organic CapEx side?

Jamie Welch, CEO

I think there is, there are always more things that we can do. The Brandy Wine to us was about security of supply and ensuring that we control the NGLs the NGLs coming out of Diamond Cryer, we do. Yeah, obviously out there is the potential related to our major shareholder dropping down their 25% or engaging in a discussion with us about dropping down the 25% in Grand Prix. Grand Prix is obviously now Grand Prix plus, Dakota Daytona expansion. So I do think there are some other bits and pieces Jackie that are, that are out there relatively modest in size. As far as other merchant acquisition opportunities, I think we've been very consistent on the GMP side. It's got to our proverbial pistol. It's got to be something that we see as tremendously value. It's additive to who we are and what we do. And that means that, collectively from a commercial standpoint, from an NGL standpoint, a residue standpoint, operational standpoint, and when I say commercial that's on the customer side and the types of customer contracts that we all collectively believe this business is worth, that that opportunity is worth more in our hands than on a standalone basis. We haven't found anything that really fits that criteria. So we are being very, very strict in how we think about things and I think we've got enough growth organically here to keep us so fully occupied that I would say none of us are just sitting idling our thumbs.

Operator, Operator

The next question is a follow up from the line of Jeremy Tonet with JPMorgan. You may proceed.

Jeremy Tonet, Analyst

Hi, thanks for squeezing me back in here. Just wanted to shift a little bit. I know it's a very small part of the portfolio, but Epic, just wondering what's your latest thoughts there in Outlook, I guess on that asset?

Jamie Welch, CEO

Trevor, would you like to give some thoughts or any.

Trevor Howard, COO

I'm happy to jump in here. Thanks for the question, Jeremy. Regarding Epic crude, as you pointed out, it's a minor segment of our business. Looking at the outlook for Permian crude production growth, we expect the margins and volumes related to our contracts to continue to improve. The pipeline is currently running quite full, so we see it as primarily a margin expansion opportunity. Given the nature of the contracts, it will largely depend on the spread between Meh and Midland. The forward outlook shows that this spread is continuing to widen, which is positive for the pipeline. Therefore, we anticipate margin expansion in that area for the next several years. However, at this point, we’re not expecting any distributions from it in 2023, which is all we can comment on today.

Jeremy Tonet, Analyst

Got it. That makes sense. Maybe it's not something to talk about at this point, but just wondering, is that an asset that you could see more capital going into or is the cap structure kind of sustainable as it is? Just kind of curious on, on that side.

Jamie Welch, CEO

I think if margins continue to if you see the net improvement that we've had there has been that improvement this year. Just let me be very clear. And I think where they started the year and where they're finishing the year are in two very different places that should make it that should keep make sure that it can deal with its own capital profile. Obviously, there's a, there's a complete uncertainty of what happens 2024, 2025, they've got debt that comes due. There's a lot of things and a lot of unknown and unknowable elements to the overall prospects for that pipeline. So, we are just, as we have, we've written that investment down to zero and as Trevor have noted, we have no anticipation of any distributions coming, nor do we have any viewpoint that there will be any further capital committed.

Jeremy Tonet, Analyst

Got it. That's helpful there. And if I could ask just one last one, and it's been touched on in the call a number of different ways, but it was just curious, as you look forward now in your area in the Permian, there's a lot of tailwinds and headwinds, for production growth. But do you see up or downside to current upstream budgets and production targets at this point? Just given the great resource versus potential takeaway issues next year?

Jamie Welch, CEO

I think you to continue to see modest growth. I don't think suddenly 2023 is going to show up and everyone's going to open up the, the safe and take all the money out and basically put it back in the drilling. I think we have seen a change of behavior. The nice thing is you can still get lots of growth. We get a lot more gas growth, the decline rates crude 70% year over year, it's only 50% for gas. That's what's creating all of the gas and that is going up. So we are seeing gas and gasier benches and formations obviously now starting to be actually overall exploited and with obviously a lot more of private folks back at it. I think you're going to see the cycle of smaller folks grow acreage positions and then will fold into Publix and life cycle will start again. And that's what we're seeing. So I think that's a really that's a nice dimension to, to have as a backdrop for '23. And Jeremy, I'll just add on that one thing is unless you see a supply response on the services side just given where costs are, it's hard for us to see rig counts materially moving higher. I mean, they've been relatively flat for the last six months. And like I said, unless there's a change to the supply-demand dynamics with services in the basin, it's hard to see us break out from that number from here.

Operator, Operator

There are no questions remaining in queue. This concludes today's conference call. Thank you for joining today's call. Please enjoy the rest of your day. Thank you.