UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549


FORM 6-K


REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934

Dated 28 February 2023

Commission File Number 333-234096


Sibanye Stillwater Limited
(Translation of registrant’s name into English)


Constantia Office Park
Cnr 14th Avenue and Hendrik Potgieter Road
Bridgeview House, Ground Floor
Weltevreden Park, 1709
South Africa
(Address of principal executive office)


Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F:

☒  Form 20-F☐  Form 40-F

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1):  ☐

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7):  ☐





EXPLANATORY NOTE

This Form 6-K (and exhibit hereto) shall be deemed filed with the Securities and Exchange Commission (“SEC”) solely for purposes of incorporation by reference into and as part of Sibanye Stillwater Limited’s registration statement on Form F-3 (Registration Statement No. 333-248452) and any amendment thereto.


2


SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

Sibanye Stillwater Limited
Date: 28 February 2023By:/s/ Charl Keyter
Name:Charl Keyter
Title:Chief Financial Officer



3


INDEX TO EXHIBITS

Exhibit 99.1

4

Exhibit 99.1
resultsbook_headersx2022x4a.jpg
JOHANNESBURG, 28 February 2023: Sibanye Stillwater Limited (Sibanye-Stillwater or the Group) (JSE: SSW and NYSE: SBSW) is pleased to report operating and financial results for the six months ended 31 December 2022, and condensed consolidated provisional financial statements for the year ended 31 December 2022.

SALIENT FEATURES FOR THE SIX MONTHS AND YEAR ENDED 31 DECEMBER 2022
•Significant improvement in safety performance. All indicators improved with the fatal injury frequency rate (FIFR) reducing by 75%
•Strong balance sheet maintained with net cash of R5.9 bn (US$344m) and net cash: adjusted EBITDA at 0.14x (2021:0.17x)
•Profit for the period of R19bn (US$1.2bn) compared to R33.8bn (US$2.3bn) for 2021
•Final dividend of R3.5bn (US$191m) or 122 SA cents per share (26.98 US cents per ADR), full year dividend of R7.37bn (US$421m) equivalent to a 6%* annual yield
•SA PGM operations continue to move down the industry cost curves despite load curtailment impact on production
•Inflation-linked three and five year wage agreements signed at the SA gold operations and SA PGM operations respectively, positioning operations for stability
•US PGM operations recover from one in 200 year flood and repositioned to respond to the changing macro environment
•Progress on Battery metals strategy
–85% holding in Keliber lithium project obtained and construction of the Keliber lithium refinery commenced in Q1 2023
–US Government offered conditional commitment for a loan of up to US$700 million for the Rhyolite Ridge lithium-boron project

* Based on the closing share price of R44.72 using R2.60 dividend per share for interim and final dividends for the year ended 31 December 2022
US dollarSA rand
Year endedSix months endedSix months endedYear ended
Dec 2021Dec 2022Dec 2021Jun 2022Dec 2022KEY STATISTICSDec 2022Jun 2022Dec 2021Dec 2022Dec 2021
GROUP
2,2341,126527782344US$mBasic earningsRm6,38012,0168,21818,39633,054
2,4931,126787775350US$mHeadline earningsRm6,48411,93812,04518,42236,878
4,6392,5101,8521,4651,045US$m
Adjusted EBITDA1
Rm18,55022,56128,05741,11168,606
14.79 16.3715.03 15.40 17.33R/US$Average exchange rate using daily closing rate
AMERICAS REGION
PGM underground operations2,3
570,400 421,133 272,099 230,039 191,094 oz
2E PGM production2,3
kg5,944 7,155 8,463 13,099 17,741 
2,097 1,862 1,913 1,935 1,766 US$/2EozAverage basket priceR/2Eoz30,609 29,799 28,755 30,482 31,021 
727 386 290 261 125 US$m
Adjusted EBITDA1
Rm2,309 4,021 4,408 6,330 10,766 
1,004 1,586 1,039 1,366 1,840 US$/2Eoz
All-in sustaining cost4
R/2Eoz31,880 21,036 15,619 25,951 14,851 
US PGM recycling2,3
755,148 598,774 352,276 361,333 237,441 oz
3E PGM recycling2,3
kg7,385 11,239 10,957 18,624 23,488 
3,515 3,067 3,932 2,906 3,274 US$/3EozAverage basket priceR/3Eoz56,747 44,752 59,098 50,202 51,987 
101 78 51 39 39 US$m
Adjusted EBITDA1
Rm676 598 757 1,274 1,490 
SOUTHERN AFRICA (SA) REGION
PGM operations3
1,836,138 1,667,464 941,973 823,806 843,658 oz
4E PGM production3,5
kg26,241 25,623 29,299 51,864 57,110 
3,182 2,622 2,696 2,817 2,434 US$/4EozAverage basket priceR/4Eoz42,188 43,379 40,517 42,914 47,066 
3,490 2,330 1,336 1,374 956 US$m
Adjusted EBITDA1
Rm16,983 21,152 20,270 38,135 51,608 
1,148 1,180 1,134 1,179 1,179 US$/4Eoz
All-in sustaining cost4
R/4Eoz20,431 18,160 17,037 19,313 16,982 
Gold operations
1,072,934 620,541 554,086 191,683 428,859 ozGold producedkg13,339 5,962 17,234 19,301 33,372 
1,787 1,798 1,780 1,864 1,720 US$/ozAverage gold priceR/kg958,232 922,851 860,303 946,073 849,703 
346 (219)184 (202)(17)US$m
Adjusted EBITDA1
Rm(440)(3,106)2,762 (3,546)5,113 
1,689 2,410 1,685 3,115 2,019 US$/oz
All-in sustaining cost4
R/kg1,124,737 1,542,355 814,347 1,268,360 803,260 
EUROPEAN REGION
Battery metals - Sandouville refinery6
— 6,842 — 4,565 2,277 tNi
Nickel production7
tNi2,277 4,565 — 6,842 — 
— 28,019 — 30,789 24,646 US$/tNi
Nickel equivalent average basket price8
R/tNi427,120 474,144 — 458,595 — 
— (30)— 4 (34)US$m
Adjusted EBITDA1
Rm(553)60 — (492)— 
— 32,239 — 29,896 38,333 US$/tNi
Nickel equivalent sustaining cost9
R/tNi664,311 460,397 — 527,676 — 
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 1



1The Group reports adjusted earnings before interest, taxes, depreciation and amortisation (EBITDA) based on the formula included in the facility agreements for compliance with the debt covenant formula. Adjusted EBITDA may not be comparable to similarly titled measures of other companies. Adjusted EBITDA is not a measure of performance under IFRS and should be considered in addition to and not as a substitute for other measures of financial performance and liquidity. For a reconciliation of profit/loss before royalties and tax to adjusted EBITDA, see note 11.1 of the condensed consolidated provisional financial statements
2The US PGM operations’ underground production is converted to metric tonnes and kilograms, and performance is translated to SA rand (rand). In addition to the US PGM operations’ underground production, the operation treats recycling material which is excluded from the 2E PGM production, average basket price and All-in sustaining cost statistics shown. PGM recycling represents palladium, platinum, and rhodium ounces on spent autocatalysts fed to the furnace
3The Platinum Group Metals (PGM) production in the SA operations is principally platinum, palladium, rhodium and gold, referred to as 4E (3PGM+Au), and in the US operations is principally platinum and palladium, referred to as 2E (2PGM) and US PGM recycling is principally platinum, palladium and rhodium referred to as 3E (3PGM)
4See “Salient features and cost benchmarks” sections for the definition of All-in sustaining cost (AISC)
5The SA PGM production excludes the production associated with the purchase of concentrate (PoC) from third parties. For a reconciliation of the production including third party PoC, refer to the "Reconciliation of operating cost excluding third party PoC for Total US and SA PGM, Total SA PGM and Marikana" sections
6The Sandouville refinery processes nickel matte and is included in the Group results since the effective date of the acquisition on 4 February 2022
7The nickel production at the Sandouville refinery operations is principally nickel metal and nickel salts (liquid form), together referred to as nickel equivalent products
8The nickel equivalent average basket price per ton is the total nickel revenue adjusted for other income - non-product sales divided by the total nickel equivalent tons sold
9See "Salient features and cost benchmarks - Six months Sibanye-Stillwater Sandouville Refinery" for a reconciliation of cost of sales before amortisation and depreciation to nickel equivalent sustaining cost




Stock data for the six months ended 31 December 2022JSE Limited - (SSW)
Number of shares in issuePrice range per ordinary share (High/Low)R35.74 to R49.49
- at 31 December 20222,830,370,251Average daily volume10,552,646
- weighted average2,830,196,826NYSE - (SBSW); one ADR represents four ordinary shares
Free Float99 %Price range per ADR (High/Low)US$8.16 to US$11.34
Bloomberg/ReutersSSWSJ/SSWJ.JAverage daily volume2,941,763

TABLE OF CONTENTS
Notes to the condensed consolidated financial statements




Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 2


STATEMENT BY NEAL FRONEMAN, CHIEF EXECUTIVE OFFICER OF SIBANYE-STILLWATER
The Group's performance for 2022 reflects significant positive achievements in some respects, and notable challenges in others.

Without doubt, the most significant achievement during 2022, was the ongoing improvement in our safety performance and turnaround in the number of fatal incidents.

The fatal elimination program that we introduced and developed during 2022 was a fundamental change in the approach to safety across our business. This was not a safety campaign but rather an introduction of a safety cultural transformation that impacts over 85,000 employees.

Through this change we experienced some notable disruptions, including turnover of personnel across all levels at the operations, an impact on production, and an increasing acceptance by our staff and organised labour representatives that this is a new way of doing business. These factors have however been surpassed by a sense of belief, a sense of pride and a commitment to being visible leaders in the industry and we now have aligned our senior leadership to deliver this.

Our focus and opportunity as we move into 2023, will be to continue to improve off the foundation that has been built, to ensure a similar level of engaged leadership throughout the organisation.

The significant improvement in all our lagging indicators, most notably fatal incidents, with the Group fatal injury frequency rate (FIFR) declining by 75%, not only retracing the anomalous regression in fatalities we experienced during 2021, but declining to record levels previously not achieved in the history of the Group, is a reflection of the efforts by all our teams and a positive confirmation that the strategy we have adopted is yielding the results we are seeking.

Despite these improvements, our increased focus on leading indicators continues to highlight that we still experience levels of risk at some of our operations that requires continued focus and still have much to do regarding eliminating fatalities on a sustainable basis. We regrettably suffered five fatalities across the Group during 2022, and while this is an improvement on the 21 fatalities in 2021, it is five too many; eliminating fatal incidents is the first step in our continued effort to ensure our goal of zero harm in the workplace is achieved.

The Board and management of Sibanye-Stillwater extend their sincere condolences to the family, friends, and colleagues of our departed employees. We remain committed to continuous improvement in health and safety at our operations. This is a deliberate journey and whilst we have made significant progress, we continue to modify the strategy based on lessons learned and industry best practice to improve our risk approach, eliminate fatalities and improve accident statistics.

The Group operating and financial results for 2022 were impacted by exogenous factors including a more challenging macro-economic and geopolitical environment and the severe weather event in Montana, which impacted our US PGM operations. Global macro influences, including significant inflationary cost pressures globally, ongoing supply chain disruptions and a deteriorating economic outlook, which reflected in lower demand and lower prices for the metals we produce. The severe weather event caused regional flooding across Montana in June 2022 and restricted access to the Stillwater mine resulting in the operations being shut for 7 weeks. These are some of the factors we have previously highlighted as existential threats (the Grey Elephants) which we need to be mindful of and adapt to, to ensure the sustainability of our organisation and the ecosystems within which we operate.

The 2022 results also reflect more specific incidents, which are partly within our control such as the three-month industrial action and lock out at the SA gold operations, which was necessary to ensure the sustainability of the SA operations and protect the rights of other stakeholders. The outcome of this approach was a historic, five-year inflation linked wage agreement at the SA PGM operations which was achieved timeously and without any disruptions during 2022. This agreement secures a period of relative stability for the SA PGM operations until mid-2027, which will more than compensate for the cost incurred from the industrial action at the SA gold operations.

The manner in which these unanticipated operational disruptions and other external challenges we faced were managed gives me confidence that the regional organisational structure we established in late 2021 is appropriate for the diversified nature of the larger, multinational business. Focused regional teams have been appointed to ensure continued operational delivery across the Group, and appropriate responses to the unique environments in the regions we operate.

The industrial action and flooding events resulted in significantly reduced production from the SA gold and US PGM operations during 2022, with a concomitant increase in unit costs. The phased resumption and build-up of safe production after these operational stoppages also negatively impacted production and costs during the second half of the year, resulting in Group revenue declining by 20% to R138.3 billion (US$8.4 billion) for 2022 compared with R172.2 billion (US$11.6 billion) for 2021.

Group adjusted EBITDA of R41.1 billion (US$2.5 billion) for 2022 was 40% lower than the record adjusted EBITDA of R68.6 billion (US$4.6 billion) for 2021, but still the third highest Group adjusted EBITDA recorded since listing. This was despite the SA gold operations recording a R3.5 billion (US$219 million) adjusted EBITDA loss (compared with a positive R5.1 billion (US$346 million) adjusted EBITDA contribution for 2021) and the adjusted EBITDA contribution from the US PGM underground operations declining by 47% to US$386 million (R6.3 billion).

Normalised earnings1 for 2022 of R21 billion (US$1.3 billion) were 46% lower year-on-year, with normalised earnings1 of R9.8 billion (US$558 million) for H2 2022, 32% lower than for H2 2021, primarily due to the impact of lower commodity prices and production at the SA gold and US PGM operations.

The Board approved a final dividend for H2 2022 of R3.5 billion (US$191 million) or 122 SA cents per share (26.98 US cents* per ADR), which is at the upper end of the Group dividend policy range of 25% to 35% of normalised earnings1. Together with the interim dividend of R3.9 billion (US$230 million) (138 SA cents per share/32.4640 US cents per ADR) for H1 2022, this represents a leading annual dividend yield of 6% for 2022 (at the closing JSE share price of R44.72/share on 31 December 2022).

Despite the challenges faced during 2022, the Group still generated positive adjusted free cash flow of R9.5 billion (US$581 million), maintaining the strong financial position at year end, with cash and cash equivalents of R26.1 billion (US$1.5 billion) exceeding borrowings (excluding non-recourse Burnstone debt) of R20.2 billion (US$1.2 billion), resulting in a R5.9 billion (US$344 million) net cash position and a net cash: adjusted EBITDA ratio at 0.14x.

This solid performance is testament to the significant benefits achieved through the Group's growth and diversification strategy over the last decade, which has resulted in a more resilient and sustainable business. 2022 was a year of consolidation and repositioning for the
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 3


Group and, while the operating and financial performance for the year may not reflect this on first consideration, I am confident that the Group is well positioned to continue creating superior shared value for all stakeholders for many years to come.
1    Non-IFRS measures such as normalised earnings are the responsibility of the Group’s Board of Directors and are presented for illustration purposes only, and because of its nature, normalised earnings should not be considered as a representation of financial performance under IFRS. Refer note 8 of the condensed consolidated provisional financial statements for the definition and reconciliation of normalised earnings

A DECADE OF SHARED VALUE
On 11 February 2013, just 10 years ago, Sibanye Gold Limited was unbundled by Gold Fields Limited and listed on the JSE and the NYSE as an independent company with three deep level South African gold mines and a market capitalisation of approximately R10 billion.

Today the Group has evolved into multinational diversified mining and metals processing Group with a portfolio of operations, projects and investments across five continents and with a market capitalisation more than 12-fold larger than it was in 2013. Notably, in addition to the significant capital growth in the business, we have returned over R40 billion in additional value to investors in the form of dividends and share buybacks, four times our initial market capitalisation on listing.

This decade long journey represents significant value creation for all stakeholders, and not exclusively for investors. Early on in our existence, we recognised the importance of creating superior value for all stakeholders. This philosophy is captured by our Umdoni tree which symbolises our business ethos, and the early adoption of a stakeholder capitalism and shared value culture approach.

The impact that Sibanye-Stillwater has made, and the value we have created for all stakeholders during this journey, is evident when comparing our shared value on inception in 2013 to 2021 (which are our most recent audited numbers). In 2013, we employed just over 36,000 people including contractors in South Africa which by 2021 had increased to about 85,000 worldwide. We paid R6 billion in salaries and benefits in 2013, which has grown to over R26 billion in 2021, a more than four-fold increase. In addition to these salaries and benefits, approximately R1.4 billion over the last two years has benefited 46,000 employees in the form of dividends and other employee share option scheme payments. Entry level salaries at our SA gold operations have increased by over 105% since 2013, significantly higher than inflation, contributing to a decent living wage and reducing wage disparity.

The value we have shared with our communities through socio-economic development and corporate social investment programs has also increased significantly over the last 10 years, from just over R1 billion in 2013 to over R2.2 billion in 2021, a 110% increase. We have recently gone beyond these investments by committing 1.5% of equivalent value to dividends paid out to shareholders, to infrastructure development projects in our local communities.

Our contribution to local society and economies goes beyond these investments, with taxes and royalties paid to governments in the regions we operate increasing from R554 million in 2013 to almost R18 billion in 2021, a more than 30 times increase.

As an organisation that produces metals and materials necessary for our society to operate sustainably on a daily basis, and with our strategic focus on delivering on our strategic differentiators of “being recognised as a Force for Good”, “building a Unique global portfolio of green metals and energy solutions that reverse climate change”; and doing so in a way which is “Inclusive, diverse and bionic” as well as being instrumental in “building pandemic-resilient ecosystems”, I expect that we will be able to continue to deliver on our vision: “to be a leader in shared value for all stakeholders” for many decades to come.

This will not be easy. The journey so far has not been smooth, and we have had to overcome many challenges along the way, including industrial action, pandemics, extreme weather events and more, but I am confident that the manner in which we have faced and overcome our challenges so far, demonstrates that we have the right people and team to ensure that we deliver more growth and value.
OPERATING REVIEW
Production from the SA PGM operations for 2022 (including attributable ounces from Mimosa and third-party purchase of concentrate (PoC) of 63,344 4Eoz) of 1,730,808 4Eoz, was marginally below the lower end of annual guidance for 2022. This was a solid performance considering the ongoing impact of Eskom load curtailment as well as factors highlighted previously, including copper cable theft and proactive safety related stoppages. In absolute terms, costs at the SA PGM operations continued to be well managed, with AISC (excluding PoC) of R30 billion (US$1.8 billion) only 3% higher year-on-year. As a result of the year-on-year decline in production however, AISC for 2022 was 14% higher than 2021, increasing to R19,313/4Eoz (US$1,180/4Eoz). This was primarily due to the increased load shedding during H2 2022, with AISC of R20,431/4Eoz (US$1,179/4Eoz) for H2 2022, 13% higher than for the first half of 2022 (R18,160/4Eoz (US$1,179/4Eoz)).
This consistent cost management continues to enhance the relative competitiveness of the SA PGM operations, which have continued to move from the upper end of the cost curves prior to integration into the Group, towards the lower half of the global industry cost curves over the last five years. Pleasingly, stockpiled ore containing approximately 33,000 4Eoz which had accumulated by the end of Q3 2022 due to intensified load curtailment impacting concentrator capacity across the SA PGM operations, was largely processed during the year-end holiday period in December 2022. However, due to timing of the processing of this stockpiled ore (during the December holidays, after the close of the financial year and), 4E PGM sales were 68,707 4Eoz lower than produced for the year, with refined metal produced during this period held as refined PGM inventory, which will reflect as sales for Q1 2023.
2022 also marked the end of the term for the payment of the structured Rustenburg acquisition consideration entered into with Anglo American Platinum (AngloPlat) in 2016. In terms of this agreement, Rustenburg has been paying AngloPlat a deferred annual payment calculated as being equal to 35% of the distributable free cash flow generated by the Rustenburg operation over the six year period, subject to a minimum payment of R3 billion. From 2023 onward, 100% of the cash flow from the Rustenburg operations will accrue to Sibanye-Stillwater and minority BEE shareholders of the Rustenburg operations, including employees.
The SA gold operations (excluding DRDGOLD) were suspended for three months during H1 2022 due to the industrial action and lockout resulting in a 50% decline in production for 2022 to 13,736kg (441,623oz). Production of 10,608 kg (341,055oz) for H2 2022, was significantly improved compared to production of 3,128kg (100,568oz) for H1 2022, reflecting the successful ramp up post the industrial action and the completion of the tailings storage facility (TSF) remediation at the Beatrix operation. More normalised rates of production were achieved during November 2022 and have been maintained during Q1 2023 to date. Including DRDGOLD, production for the year was 19,301kg (620,541oz). In the absence of any further disruptions, which are not expected, production for 2023 is forecast to be significantly higher than for 2022, with correspondingly lower unit costs.
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 4


The ramp-up of production from the US PGM operations post the regional flood event in early June 2022 progressed well, with production rates normalising during Q4 2022. Mined 2E PGM production for 2022 of 421,133 2Eoz was 5% below the lower end of annual guidance, reflecting the full impact of the flood event as well as ongoing operational constraints which contributed to the repositioning of the US PGM operations as presented to the market in August 2022 (https://thevault.exchange/?get_group_doc=245/1660214769-ssw-repositioning-US-PGM-operations-changing-macro-environment-11August22.pdf). AISC of US$1,586/2Eoz (R25,951/2Eoz) for 2022 were substantially higher than AISC of US$1,004/2Eoz (R14,851/2Eoz) reported for 2021, primarily as a result of lower production, compounded by inflationary cost impacts and increased ore reserve development (ORD) and sustaining capex associated with the repositioned plan, which resulted in a significant increase in unit costs for H2 2022 relative to H1 2022. Implementation of the repositioned plan is in process, with production forecast to build-up to 700,000+ 2Eoz by 2027 and AISC reducing to less than US$1,000/2Eoz, once flexibility has been restored across the complex and the new cemented backfill plant at Stillwater East has been completed.
The global slowdown in used car scrappage rates due to the uncertain global economic environment, higher interest rates and higher new car prices as well as continued supply chain constraints, (including port and road transport) and a firm adherence to our responsible sourcing principles, impacted receipt and feed rates at the US PGM recycling operation during 2022. Spent autocatalysts containing 3E PGM of 598,774 3Eoz were fed during 2022, 21% lower than 2021.
For the 11 months since acquisition on 4 February 2022, the Sandouville nickel refinery produced 4,839 tonnes of nickel metal, 2,003 tonnes of nickel salts and 153 tonnes of cobalt chloride at a nickel equivalent sustaining cost of US$32,239/tNi (R527,676/tNi). While lower production was expected as a result of planned annual plant maintenance, H2 2022 was impacted by technical challenges at the plant and higher input costs, primarily gas and electricity. The focus for 2023 will be to improve plant availability and to reduce the frequency of unplanned maintenance. Progress has been made in reviewing and renegotiating contracts with suppliers and customers which should results in improved commercial terms at Sandouville for 2023. Since year end there has been a change of leadership at Sandouville and several senior appointments have been made in the European region to further support the recovery at the Sandouville operations. The focus is on continuity and stability of production by de-bottlenecking the plant to increase throughput to nameplate capacity of c.12kt of Ni metal, c.4kt of Ni salts and c.600t of CoCl2 by 2026.
Wage negotiations
Despite the industrial action and lockout which impacted our SA gold operations during the year, we believe that we have preserved significant long-term value through the firm position we took during negotiations. Subsequent to the end of the industrial action at the SA gold operations, the SA PGM operations secured a historic five-year agreement with most of the same unions, without disruption or the need for third party intervention. The annual wage and benefit increases that were agreed at both the SA gold and PGM operations, were in line with inflation and importantly, secured a five-year period of labour stability at the Rustenburg and Marikana operations, which will facilitate delivery of significant value for all stakeholders.

These agreements followed a new collective bargaining agreement with the United Steel Workers International Union (USW) for the East Boulder mine for the period 16 February 2022 through to 31 July 2024. This settlement also represented an inflation linked agreement, consistent with our approach in South Africa. Wage negotiations for the Kroondal operation commence in mid-2023, and we are confident that a similarly positive outcome can be achieved with union representatives at the operation.

MARKET OVERVIEW
Green metals
PGM market - 2022
PGM prices were volatile during 2022, impacted by the Russian invasion of Ukraine during H1 2022, causing temporary supply security concerns amongst end users and by ongoing uncertainty about the global macro-economic outlook.
Russia accounts for approximately 40% of global primary palladium supply (2.7 million ounces) and the incursion into Ukraine resulted in the palladium price surging to record levels at well over US$3,000/oz in March 2022, fuelled by expectations of sanctions being imposed on Russia. Despite US and EU sanctions and Russian refineries being removed from the London platinum & palladium market (LPPM) Good Delivery list, Russian metal continued to flow to other regions. Production from Norilsk was slightly ahead of guidance for 2022, due to the repairs of its furnace No.2 at the Nadezhda Metallurgical Plant being postponed until 2023 and sufficient inventory and spares to maintain production. Norilsk has already indicated that the outlook will be more challenging as access to capital equipment, parts and skills become an increasing issue due to sanctions by Western countries and companies. The palladium price ultimately retreated, ending the year 9% lower at US$1,782/oz.

The platinum price began the year at US$961/oz, peaking at US$1,150/oz in March 2022, before contracting below US$850/oz by mid-year. Concerns about the outlook of supply from South Africa due to escalating power disruptions and increased imports into China, resulted in a recovery in the price, which ended the year 9% higher at US$1,048/oz.

The rhodium price rallied sharply early in 2022, exceeding US$20,000/oz after Russia invaded Ukraine, but similarly to palladium, the rhodium price pulled back to US$12,250/oz at the end of the year, a 13% decline year on year.

Automotive production grew 7.8% year-on-year in 2022, to just over 80 million light vehicles (LDV), driven by an easing of the global chip shortage and the relaxation of COVID-19 restrictions in the west. Auto production was still well below pre-COVID-19 levels of 86.6 million units in 2019 as China's zero COVID-19 policy and worsening macro-economic conditions impacted consumer demand. Heavy-duty vehicle production contracted year-on-year, primarily as a result of reduced orders from China, which remained under strict COVID -19 restrictions until late in the year.

Demand for platinum in automotive applications increased by 17% year-on-year to 2.8Moz as a result of the increase in auto production but mainly due to the substitution of palladium with platinum in gasoline autocatalysts.

Net jewellery demand remained flat at 1.2Moz, well below the 2Moz levels last see in 2015, as China remained closed and competition for disposable income abounds. Similarly, industrial demand dropped 7% year-on-year, largely as a result of China.

Gross automotive demand for palladium rose by 1% year-on-year to 8.5Moz due to the recovery in light vehicle production, however also impacted by substitution of platinum for palladium in gasoline autocatalysts along with increased loadings on catalytic converters in commercial vehicles associated with tighter emissions standards in China and India. Substitution of palladium by platinum in gasoline ICEs increased to approximately 490koz during 2022 through increased adoption of tri-metal catalysts, primarily in China and the USA.
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 5



Industrial demand rose modestly as continued strong growth in the glass and petroleum industries offset a decline in demand from the chemical industry.
Recycling of autocatalytic converters was constrained by lower scrappage rates of second-hand vehicles due to the ongoing constraints to auto production, higher interest rates, macro-economic uncertainty and supply chain constraints. 3E recycling was down 8% year-on-year.

Overall, 2022 ended with a bigger platinum surplus (~700koz), a bigger palladium deficit (~350koz) and a rhodium market in balance.

PGM market outlook -2023
Despite the stability provided by most companies concluding five year wage agreements, supply from South Africa is at risk due to ongoing load curtailment by Eskom and the worsening operating environment (e.g. cable theft, crime). Russian supply is also expected to scale back, with Norilsk Nickel already indicating lower production for 2023 and delays to its projects as access to capital equipment and spare parts becomes more challenging due to sanctions, resulting in increased unavailability of equipment.
Recycling is expected to increase by 8% year-on-year, with 2023 recycling output forecast to recover to 2021 levels as new car sales increase, allowing for older vehicles to be scrapped.

LDV production is forecast to increase to 82.5 million units (vs 80.6 million in 2022) due to the ongoing reopening of the Chinese economy from COVID-19 restrictions, a more constructive outlook and a softer macro-economic landing. As China re-opened at the end of 2022, it was hit by a wave of COVID-19 infections, shortly followed by the lunar new year holidays which began in January 2023. As a result, a recovery in the Chinese market is expected to materialise from Q2 2023, with some risk to the downside - depending on the economic outlook. We expect PGM prices to remain muted, particularly during Q1 2023.

We expect further positive demand increments for PGMs due to increased loadings on autocatalysts. Euro 6e emissions regulations were published in December 2022 and come into force in September 2023. Under the new regulations, the conformity factors for RDE (real driving emissions) testing tighten to 1.1 for NOx and 1.34 for PN (particle number), which should be positive for loadings.

In contrast, we anticipate further growth in market share of battery electric vehicles (BEV) from 10% in 2022 to approximately 12% in 2023.

We expect substitution to increase in line with further adoption of the tri-metal catalysts and auto sales (~730koz Pd replaced with Pt in gasoline autocatalysts).

For 2023 we forecast a smaller platinum market surplus of 100 koz, a small deficit of 100koz for palladium and rhodium projected to be close to balance.

Battery Metals market update
Lithium
China continues to be the primary driver of global BEV demand and production. BEV production from China almost doubled during 2022 to over 5 million units, meaning that one fifth of LDVs produced in China are now BEVs. The extension of ‘new energy vehicle’ subsidies was the major factor incentivizing increased production of EVs during the year. Globally, production of BEVs in 2022 exceeded expectations, increasing to 8.4 million units or 10% of global LDV production, with strong growth also recorded in Europe and the USA. As a result of this increase in BEV demand, particularly in China, lithium prices reached record highs in 2022 and remained well supported throughout the year, averaging almost $70,000/t LCE for the year, nearly 300% higher than for 2021.
Gross lithium demand is estimated to have increased by 46% last year, mainly driven by increased global demand from the battery sector. BEV sales are estimated to have been responsible for almost three-quarters of this growth in gross demand, with Chinese BEV production and sales in particular exceeding market expectations.
Primary lithium supply is estimated to have increased by 29% in response to the growth in demand, with almost all of the supply growth coming from brownfield mine and brine expansions in Australia and Chile.
There has been a preferential shift in battery-grade lithium precursors towards lithium carbonate due to the resurgence of lithium iron phosphate (LFP) cathodes in China. Lithium hydroxide remains the driver of demand growth in Europe and North America however, as nickel-rich cathodes continued to dominate in those regions.
Lithium demand for 2023 is forecast to increase by 21% from 2022 levels, with the majority of this growth coming from growth in demand from automotive batteries. Sustained higher prices and an improved long-term outlook for lithium demand has prompted a supply response as highlighted, and lithium prices are expected to pull back from the record levels seen in 2022 but remain well above the long-term historic average prices. This is a necessary market dynamic which incentivizes new projects that will be required to meet demand growth. Primary lithium supply growth is still expected to lag demand over the next decade, but new projects are placed to meet market requirements in the next few years, under the right conditions.
The increased focus on environmental and social factors in recent years has added to the complexity of permitting and developing new projects, with timelines significantly extended. Considering current projections for BEV penetration into the global automotive market, significant investment in new lithium supply will be required to meet forecast demand over the next decade. In our view, new supply is unlikely to keep pace with forecast demand, resulting in deficits in lithium supply from 2026/2027, which will maintain higher prices for longer.
Nickel
Nickel demand from the battery sector is estimated to have grown by 40% in 2022 compared with 2021, primarily driven by strong BEV sales.
However, a 7% contraction in stainless steel demand towards the end of 2022 and continuing during 2023, has offset this increased demand. Stainless steel has been affected by the real estate downturn in China and a deterioration in the Europe economy.
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 6


The tightness in the class 1 nickel market also eased over the year, despite strong demand from electric vehicle batteries. The bifurcation between class 2 and class 1 nickel markets has somewhat disappeared owing to the ramp up of nickel pig iron (NPI) to matte conversion capacity in Indonesia. While this conversion has a higher carbon intensity than traditional class 1 nickel production routes, this is not thought to be an issue for in the Asian market. Furthermore, new generation HPAL plants in Indonesia are ramping up more smoothly than previously anticipated, further easing the concerns over the availability of suitable feedstock for the battery supply chain.
Nickel prices averaged $26,300/t on the LME in 2022, 42% higher than 2021. A short squeeze in Q1 led to a price rally in early March before receding to around $20,000/t by Q3. Price volatility following Russia’s invasion of Ukraine subsided as the commodity and associated producers remained absent from sanction lists and anticipated supply chain disruptions did not materialise.
Following a small deficit in 2021, the nickel market is estimated to have shifted into a surplus owing to strong supply growth from Indonesia. Total nickel supply is estimated to have risen 13% in 2022 to over 3 million tonnes, while demand is estimated to have contracted by 3% to 2.7 million tonnes (net of recycling).
The nickel market is predicted to remain in surplus in 2023. Primary supply is projected to grow by 17% this year as mines continue to ramp up output in Indonesia, compared to a more modest 6% growth for demand.
STRATEGIC REVIEW
A disciplined focus on capital allocation and value accretive M&A was maintained during 2022. Battery metal prices remained at elevated levels throughout the year and a move by other industry peers toward diversifying into the battery metals space was evident.
Meaningful progress has been achieved in 2022 with the growth in the European region. An 85% interest in Keliber was acquired by exercising our right to take a 50% stake and concurrently making an offer to minority shareholders other than the Finnish Minerals Group, which remains a key shareholder. The required permits to advance the project have been obtained and construction of the refinery has commenced in 2023.
The Sandouville recapitalisation is gathering momentum, and prospects are good for establishing PGM, and in time, battery metals recycling operations on a meaningful scale in Europe. We are also positioning to become more active in global tailings reprocessing through a recent increase in our investment in New Century.
Commitments have also been obtained from the US Department of Energy for loan funding of up to US$700 million for the development of the Rhyolite Ridge project in Nevada. This reflects the strong support for establishing local supply of the critical minerals required for a low carbon economy in both North America and in Europe, where we have purposefully built strategic beachheads.
These opportunities do not exclude selective expansion into Africa as part of our Africa Region strategy. We have identified that Zambia, under President Hichilema’s new leadership, is transforming into an attractive jurisdiction seeking to attract mining capital under a favourable policy environment. While the Zambian mining industry has been devastated through years of poor regulation and neglect, confidence is building that the changes will persist creating meaningful opportunities for renewal of its mining industry. The intended sale of the Mopani mine is of particular interest presenting a unique opportunity to secure meaningful production ounces of copper, a key green metal for the low carbon economy, at a favourable entry point in the commodity cycles.
With such opportunities scarce in other parts of the world and greater competition for resources due to perceptions of the risk context, we see diversification of specific commodities and jurisdictions within Africa as a meaningful contributor to growth in our green metals strategy.
OPERATING GUIDANCE FOR 2023*
Following the normalisation of production rates at the Stillwater mine during Q4 2022, the US PGM operations are expected to deliver in line with the repositioned plan, with 2E PGM production for 2023 forecast at between 500,000 2Eoz and 535,000 2Eoz, with AISC of between US$1,400/2Eoz to US$1,500/2Eoz reflecting higher ORD and sustaining capital for the near term, as per the repositioned plan. Capital expenditure is forecast to be between US$285 million and US$300 million, including approximately US$25 million project capital.
3E PGM production for the US PGM recycling operations is forecast to be between 450,000 and 500,000 3Eoz fed for the 2023 year Capital expenditure is forecast at US$2.6 million (R41.9 million).
4E PGM production from the SA PGM operations for 2023 is forecast to be between 1.7M 4Eoz and 1.8M 4Eoz including approximately 60,000 4Eoz of third party PoC, with AISC between R20,800/4Eoz and R21,800/4Eoz (US$1,300/4Eoz and US$1,363/4Eoz) - excluding cost of third party PoC. Capital expenditure is forecast at R5.4 billion (US$338 million)* for the year, including project capital of R920 million (US$58 million) on the K4 project.
Gold production from the managed SA gold operations (excluding DRDGOLD) for 2023 is forecast at between 23,500kg (756koz) and 24,500kg (788koz). This guidance reflects a return to normalised rates of production following the industrial action in 2022 but excludes production from Beatrix 4 shaft and Kloof plant 1, which are currently subject to Section 189 consultations. AISC is forecast to be between R950,000/kg and R1,020,000/kg (US$1,882/oz and US$1,940/oz). Capital expenditure is forecast at R5.9 billion (US$237 million), including R1.95 billion (US$122 million) of project capital expenditure provided for the Burnstone project and R150 million (US$9 million) on the Kloof 4 deepening project).
Production from the Sandouville nickel refinery is forecast at between 9.5 and 10.1 kilotonnes of nickel product, at a Nickel equivalent sustaining cost of €24,813/t (R409k/t)* and capital expenditure of €15.9million (R262.9million)*. Capital expenditure at the Keliber lithium project for 2023 is forecast to be about €231million (R3.81 billion)*.

*The guidance has been translated where relevant at an average exchange rate of R16.00/US$ and R16.50/€


NEAL FRONEMAN
CHIEF EXECUTIVE OFFICER
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 7


SIBANYE-STILLWATER GROUP SAFETY AND OPERATING REVIEW
Safety
The health and safety of our employees continues to be our first priority and we remain committed to ensuring a safe work environment at all of our operations. The continued improvement in safety statistics throughout the Group during 2022 and particularly, the significant decline in fatalities was pleasing. All Group safety indicators improved year-on-year and the positive safety trends established since mid-2021 were maintained, reinforcing our confidence in the applicability of our Real risk reduction priority focus which was implemented following a concerning deterioration in safety across the Group during 2021.

This commendable improvement in the Group safety performance is reflected in a 29% improvement in the total recordable injury frequency rate (TRIFR) from 7.10 (per million hours worked) for 2021 to 5.07 for 2022, a 23% improvement in the serious injury frequency rate (SIFR) from 3.77 for 2021 to 2.91 for 2022 and a 27% improvement in the lost time injury frequency rate (LTIFR) from 6.03 for 2021 to 4.41 for 2022. Notably, these safety metrics for 2022 were also substantially better than the average Group safety metrics achieved during 2019 and 2020, with the average LTIFR, SIFR and FIFR for 2022 18%, 4% and 40% better respectively- than the comparable metrics for the average of 2019 and 2020, both of which were considered good safety years prior to the regression in safety statistics in 2021.

The focus for 2022 and continuing during 2023, remains on eliminating fatal incidents, with the anchors being the implementation of our Critical controls, Critical life saving behaviours and Critical management routines in order to prevent fatalities. The key message in the Fatal Elimination strategy in 2022 was "Block the path to death, know when to stop unsafe work and to stop without hesitation". As part of making a life saving commitment, over 95% of Sibanye-Stillwater employees have signed a "Life saving commitment booklet" which contains our essential safety and lifesaving protocols and has helped equip teams with a deeper understanding of our safety protocols and their responsibilities, including when to stop unsafe work practices without hesitation, so that they and their team mates can return safely to their families every day.

In terms of operationalising the fatal elimination plan, the teams' focus is to understand ineffective controls and to address identified factors through site-specific fatal elimination plans. With the priority on high-energy incidents, near miss reporting has become an essential tool to eliminate the potential loss of life and we have classified all incidents into two categories, namely:

•Injuries with the Potential loss of life (IPLL)
•Non-injuries (incidents) with the Potential loss of life (NIPLL)

Weekly potential loss of life reviews have been instituted and capture the Learning from Incidents (LFI) process supporting lessons and learnings to be shared throughout the Group.

The Group has implemented minimum group standards, which define minimum requirements for Critical controls, Critical lifesaving behaviours and Critical management routines throughout the Group. Our focus is on proactive operational line management intervention based on the assessment of leading indicators and improvements in these areas.

Consequent to the intensified focus on eliminating fatal incidents, we experienced a significant reduction in fatal incidents during 2022, with the number of fatalities reducing from 21 in 2021 to five in 2022. This represents a significant milestone in deep level mining in South Africa, specifically with the fatal injury frequency rate (FIFR) declining to 0.033 for 2022, a 75% improvement relative to 2021 and the lowest fatality metrics achieved in the 10-year history of the Group. This is however still five fatals too many, and our relentless focus on eliminating risk from our operations will underpin our journey to sustainably eliminate fatalities from our workplaces. On 21 January 2023, the SA gold operations recorded 2 million fatality free shifts and on 14 February 2023 the SA PGM operations recorded 5 million fatality free shifts. These indicators provide an encouraging platform to build on for the future. We are confident that these interventions have meaningfully contributed to the significant reduction in fatal incidents, and we strongly believe that we can achieve our goal of zero harm in the workplace.

Sadly, on 8 October 2022 at the SA gold Kloof operations, a 40-year old locomotive operator, Ms. F Ntlekisana sustained serious injuries and passed away in a tramming related incident. While this single fatality for Q4 2022 statistically represents a commendable improvement when compared with the nine fatalities suffered during Q4 2021, any death is unacceptable.

US PGM operations
The severe weather event which caused regional flooding across Montana in June 2022, restricted access to the Stillwater operation for seven weeks and caused the suspension of all operating activities at the Stillwater mine (which comprises 60% of production from the US PGM operations) until access to the mine was restored. The gradual build-up to normalised production levels by November 2022 further impacted the operational results during H2 2022. In addition, the cumulative impact of various operational constraints since 2018 and persistent skills shortages, severely restricted operational flexibility and productivity, significantly affecting production and costs during the year.

The deteriorating economic and operating environment and less positive palladium price outlook, prompted a review and repositioning of the US PGM operations to address operational constraints and volatility by improving operational flexibility, thereby ensuring more consistent operational and financial results and a sustainable production build up to over 700,000 2Eoz per annum at AISC below US$1,000/2Eoz (in 2022 terms) by 2027. The detail related to the repositioned operational plan is available at https://www.sibanyestillwater.com/features/us-pgm-operations-review/. Achieving the targeted production and costs will require increased investment in ore reserve development and other essential maintenance capital over a two to three year period to improve the developed state of the mines, and construction of a new underground cemented backfill plant at Stillwater East, which will provide an appropriate support solution to the challenging ground conditions. A number of mining stopes in areas that require cemented backfill for safety and quality of mining reasons, have been suspended until the anticipated completion of the plant within the next 3 years, which will then enable mining to resume in the suspended stopes and allow for a relatively quick ramp up in production at Stillwater East once the plant is commissioned.

As a result of the flood event and other operational constraints highlighted in the H1 2022 and Q3 2022 results (East Boulder geological and geotechnical complexity associated with mining West compounded by critical skills shortages/elevated nitrous oxide levels), mined 2E PGM production from the US PGM operations of 421,133 2Eoz declined by 26% compared with 2021.

Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 8


The implementation of the repositioned operational plan and accelerated development to restore flexibility is underway but productivity continues to be impacted by high employee turnover which is compounded by the low unemployment rate and skills shortage in the region and the country as a whole and more specifically for the US PGM operations - a shortage of mining, geological and artisan skills. A strong focus on sourcing, training and retaining the required skills whilst simultaneously improving the conditions of employment are being prioritised. For example revised shift rosters (seven days on/seven off) are being trialed at East Boulder to reduce travel and extend shift times for employees, which should lead to improved productivity. The high turnover statistics have begun to improve but will take several months to turnaround. Positively, after a severely disrupted 2022, production in January 2023 started well with overall production at US PGM underground operations exceeding budget.
AISC for 2022 increased by 58% to US$1,586/2Eoz (R25,951/2Eoz) primarily due to the decline in production. In addition, general inflationary costs affecting the industry, a 93% increase in ore reserve development (ORD) costs to US$176 million (R2.9 billion) due to the change in classification of Stillwater East development from growth capital to sustaining capital (ORD), greater support and equipment costs, continued reliance on contractor development at East Boulder and the ramp up of ORD across the operations to increase mining flexibility, contributed to the increase in costs. Sustaining capital (underground mining equipment including remote sensing and environmental monitoring equipment), in order to ensure a safer operating environment, increased by 35% year-on-year to US$72 million (R1.2 billion).

The decision to suspend further growth capital at Stillwater East resulted in project capital expenditure declining by 50% in 2022 to US$82 million (R1.3 billion). In line with many other industries in the USA and globally, the US PGM operations continue to experience underlying inflationary pressures, supply chain issues, input cost inflation and higher labour costs due to skills shortages, which increases reliance on contractors at a higher cost.
The decline in production in 2022 combined with an 11% year-on-year lower average 2E PGM basket price of US$1,862/2Eoz (R30,482/2Eoz) were the main drivers of a 47% decline in adjusted EBITDA from the US PGM operations to US$386 million (R6.3 billion).

2E PGM production for H2 2022 of 191,094 2Eoz was 30% lower than for H2 2021 and 17% lower than for H1 2022, reflecting the impact of the regional flooding and subsequent build up of production at the Stillwater mine. Production from the Stillwater mine of 116,786 2Eoz, was 31% lower year-on-year, while production from East Boulder of 74,309 2Eoz was 27% lower year-on-year. AISC for H2 2022 increased by 77% year-on-year to US$1,840/2Eoz (R31,880/2Eoz) with ORD spending increasing by 81% to US$93 million (R1.6 billion) and sustaining capital increasing by 141% year-on-year to US$47 million (R806 million) for the same reasons as highlighted above. In line with the suspension of further growth capital at Stillwater East and the reclassification of ORD, project capital of US$47 million (R814 million) for H2 2022 was 41% lower year-on-year.

US PGM recycling operation
The global slowdown in used car scrappage rates due to the uncertain global economic environment, higher interest rates and higher new car prices as well as continued supply chain logistic constraints, including port and road transport and a firm adherence to responsible sourcing principles, impacted receipt and feed rates at the US PGM recycling operation during 2022. Average spent autocatalyst fed by the US recycling operation declined by 21% to 18.8 tonnes per day in 2022 compared with 23.8 tonnes per day fed in 2021 with total PGM ounces fed of 598,774 3Eoz, 21% lower year-on-year.

Recycling inventory increased to 49 tonnes at the end of 2022 from 25 tonnes at the end of 2021. Customer advances reduced from US$441 million at the end of 2021 to US$258 million at the end of 2022, attributable to lower volumes of autocatalysts received during H2 2022 and lower palladium and rhodium prices, facilitating a release of US$183 million in working capital.
The average 3E PGM basket price for the US PGM recycling operations for 2022 decreased by 13% year-on-year to US$3,067/3Eoz (R50,202/3Eoz) due to lower realized 3Eoz prices with adjusted EBITDA declining by 23% to US$78 million (R1.3 billion). Net profit after net financing income from the US PGM recycling operations of US$92 million (R1.5 billion) for 2022 was 25% lower than for 2021 (US$122 million/R1.8 billion).
In H2 2022, average autocatalyst receipt rates declined by 37% relative to H1 2022. Average autocatalyst feed rates declined by 35% from 22.8 tonnes per day in H2 2021 to 14.9 tonnes per day in H2 2022. The US PGM recycling operation fed 237,441 3Eoz in H2 2022, a 33% decline when compared to H2 2021. With available inventory declining from 124 tonnes at end June 2022 to 49 tonnes at year end, given ongoing production constraints, the operation focused on inventory management during H2 2022.

SA PGM operations
The SA PGM operations delivered solid operating results, with 4E PGM production of 1,730,808 4Eoz for 2022 (including attributable ounces from Mimosa and PoC) marginally below the lower range of guidance. Production was 9% lower than for 2021 primarily due to ongoing load curtailment by Eskom which intensified towards year end and which resulted in an estimated reduction of 22,700 4Eoz during 2022. Pleasingly, stockpiled ore containing approximately 33,000 4Eoz which had accumulated by the end of Q3 2022 (due to intensified load curtailment), was largely processed during the year-end holiday period in December 2022, significantly reducing the possible production impact. Other factors which impacted production were copper cable theft, Group wide safety interventions in line with our safety strategy and temporary productivity constraints in areas where operations were mining through adverse ground conditions. Production of 1,667,464 4Eoz (excluding PoC) was 9% lower year-on-year. 4E PGM PoC processed increased by 5% to 63,344 4Eoz but was below expected levels at the beginning of 2022 due to production issues and high rainfall affecting third party PoC suppliers.

PGM sold (including attributable from Mimosa) decreased by 12% to 1,662,101 4Eoz year-on-year, approximately 69,000 4E oz lower than produced for 2022. This was primarily due to timing differences between the processing of stockpiled ore during the December holidays and the year-end financial close out. The processing facilities at the SA PGM operations continued to operate after the mining operations had stopped production for the December holidays, utilising spare processing capacity to process stockpiled ore (4E PGM output from the precious metals refinery (the PMR) in December 2022 was double the average of the prior 11 months), resulting in an increase in inventory in the processing pipeline at financial year-end, which was subsequently refined during the December holidays and stored as refined metal for sale in the vaults at the PMR. The approximately 69,000 4Eoz of refined 4E PGM metal produced and stored at the PMR during December 2022, will reflect in sales for Q1 2023.
AISC (excluding the purchase cost of associated with PoC) of R19,313/4Eoz (US$1,180/4Eoz) increased by 14% year-on-year, primarily due to lower production and inflationary pressures on imported spares, steel products, ammonia based products and fuel and oil. Considering the impact of external factors on production, this is a commendable cost performance, which contrasts with higher unit cost increases
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 9


reported by industry peers, and is likely to result in the SA PGM operations moving further down the industry cost curves. AISC (including PoC) increased by 11% to R20,078/4Eoz (US$1,227/4Eoz) due to an increase in PoC ounces, despite a reduction in the cost of PoC material as a result of lower average PGM prices.

Capital expenditure for 2022 increased by 34% year-on-year to R5.1 billion (US$312 million), exceeding guidance of R4.8 billion (US$320 million) with ore reserve development 35% higher at R2.1billion (US$130 million), sustaining capital 2% higher at R2.1 billion (US$126 million) and project spend increasing from R203 million (US$14 million) in 2021 to R925 million (US$57 million) primarily on the Marikana K4 project. Capital expenditure exceeded guidance by 7% or R328 million (US$8 million below) as a result of bringing forward the planned expenditure incurred on the No. 1 furnace rebuild project at Marikana and trackless mobile equipment (TMM) at Kroondal and Rustenburg operations, which was originally scheduled for 2023.
The average PGM basket price for 2022 of R42,914/4Eoz (US$2,622/4Eoz) was 9% lower than for 2021 and contributed to adjusted EBITDA declining by 26% to R38.1 billion (US$2.3 billion) year-on-year. The adjusted EBITDA margin of 53% remained historically high, with adjusted EBITDA for 2022 the 2nd highest annual adjusted EBITDA recorded by the SA PGM operations.
For H2 2022, the SA PGM operations produced 4E PGM of 881,656 4Eoz (including PoC) and 843,658 4Eoz (excluding PoC) which was 9% and 10% lower year-on-year respectively. This was largely due to load curtailment intensifying from September 2022 and the Simunye shaft at Kroondal reducing output as it reaches the end of its life. In H2 2022, concentrate purchases from 3rd parties increased by 48% to 37,998 4Eoz due to increased contractual deliveries.
AISC for H2 2022 (excluding PoC) increased by 20% year-on-year to R20,431/4Eoz (US$1,179/4Eoz) with AISC (including PoC) 21% higher at R21,295/4Eoz (US$1,229/4Eoz). This was primarily because of lower production, continued inflationary pressures and 42% higher ORD in H2 2022 to R1.2 billion (US$68 million) primarily because of the ramp-up in Marikana K4 development.

H2 2022 Chrome sales of 1,132kt were 1% higher than for H2 2021 (1,116kt). Chrome revenue of R1.7 billion (US$97 million) for H2 2022 was 36% higher year-on-year, mainly due to the chrome price received improving by 38% from US$166/tonne in H2 2021 to US$228/tonne in H2 2022 with increased production from the Rustenburg and Marikana operations and steady production at Kroondal.

4E PGM production from the Rustenburg operation declined by 6% to 628,897 with AISC increasing by 8% to R19,914/4Eoz (US$1,217/4Eoz), which was a solid achievement considering lower production and inflationary pressures. Bathopele production was impacted by mining through the Hex River fault with production from Siphumelele impacted by seismicity. 4E PGM production for H2 2022 of 324,025 4Eoz was 6% lower year-on-year, with surface production 18% higher at 40,877 4Eoz primarily due to improved plant recoveries which increased by 26% to 43.2% (greater amount of high grade slag treated). Underground production was 8% lower at 283,148 4Eoz. AISC increased by 10% year-on-year to R20,714/4Eoz (US$1,195/4Eoz) in H2 2022 as a result of lower production and continued inflationary cost pressures. AISC was also impacted by 10% higher royalties and 18% higher ORD offset by by-product credits which increased by 44% year-on-year primarily due to increased chrome production and price along with a higher average nickel price.

The gradual ramp-down at the Simunye shaft (forecast for shutdown in Q4 2022) and geologically challenging ground at Bambanani and Kwezi shafts, which negatively impacted productivity and head grade, impacted 4E production from the Kroondal operation. 4E PGM attributable production declined by 11% in 2022 to 201,756 4Eoz with a concomitant 20% increase in AISC to R15,514/4Eoz (US$948/4Eoz). A two-shift cycle has been implemented at Bambanani to improve face time for crews and improve output. 4E PGM production in H2 2022 was 11% lower than for the comparable period in 2021. AISC of R16,139/4Eoz (US$931/4Eoz), was 17% higher than for H2 2021 as a result of lower production, inflationary cost pressures and additional support required to mine through adverse ground conditions.
The Marikana operation was impacted by load curtailment, theft of copper cable and safety stoppages. Stockpiled ore from Marikana was processed during the year-end holiday period resulting in higher inventory levels despite being held as refined metal at year end. This is in the process of unwinding through sales during Q1 2023. The Marikana K4 project is on schedule with initial PGM production having been achieved during the year. 4E PGM production for 2022 (excluding PoC) was 12% lower at 672,917 4Eoz with AISC (excluding PoC) 18% higher at R20,500/4Eoz (US$1,253/4Eoz) due primarily to lower production, inflationary effects and 52% higher ORD capital. PoC production increased by 5% year-on-year to 63,344 4Eoz resulting in total 4E PGM production 11% lower at 736,261 4Eoz. AISC (including PoC) increased by 12% to R22,076/4Eoz (US$1,349/4Eoz).

During H2 2022, 4E PGM production (excluding PoC) at the Marikana operation for 2022 declined by 15% compared to the same period in 2021 to 337,654 4Eoz with underground production 15% lower and surface production 13% lower. PGM production (including PoC) declined by 11% year-on-year to 375,652 4Eoz, benefitting from processing of third party PoC which increased by 48% to 37,998 4Eoz.

AISC (excluding PoC) and AISC (including PoC) for the Marikana operation both increased by 29% for H2 2022 to R22,031/4Eoz (US$1,271/4Eoz) and R23,764/4Eoz (US$1,371/4Eoz) respectively. This was primarily because of lower production, continued inflationary pressures and ORD which was 57% higher year-on-year as a result of additional ORD development being done simultaneously with the development of the K4 shaft. K4 project capital is spent on shaft infrastructure and engineering and for mining up to the first development cross cut, while development beyond the first cross cut classifies as ORD. Also contributing to higher AISC for H2 2022 in comparison to H2 2021 were 28% (R700 million/US$62 million) lower by-product credits which added R1,139/4Eoz (US$118/4Eoz) to AISC. By-product credits were impacted by lower sales of PGM and lower sales of copper and nickel, with inventory built up in the base metals refinery at year end. AISC (including PoC) was also higher because of higher PoC purchase costs which increased by 46% year-on-year to R1.6 billion (US$95 million). Capital expenditure increased by 34% in H2 2022 to R2.0 billion (US$116 million) with project capital at the K4 project increasing by 165% to R519 million (US$30 million).

Attributable 4E production from Mimosa in 2022 declined marginally by 3% year-on-year to 115,534 4Eoz with AISC increasing by 17% to US$1,150/4Eoz/(R18,817/4Eoz) due mainly to inflationary pressures couple with a 56% increase in sustaining capital to US$53 million (R864 million) with the construction of a new tailings facility, additional underground infrastructure and metallurgical improvements.

Attributable 4E PGM production from Mimosa for H2 2022 declined by 1% year-on-year to 57,980 4Eoz with improved plant recoveries offsetting slightly lower throughput. In spite of the steady production performance, AISC in H2 2022 increased by 24% year-on-year to US$1,304/4Eoz (R22,594/4Eoz) due to sustaining capital increasing by 65% year-on-year to US$33 million(R570 million) and industry-wide inflationary effects. The sustaining capital increase is due to construction of a new tailings storage facility, underground infrastructure maintenance, and optimising the reagent suite and cell settings across the flotation circuit to improve recoveries.
4E PGM production from Platinum Mile in 2022 was 8% lower resulting in AISC 14% higher at R10,835/4Eoz (US$662/4Eoz). 4E PGM production from Platinum Mile of 23,558 4Eoz in H2 2022 was 23% lower year-on-year due to depletion of the higher grade East Dam
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 10


during 2021 with the focus now on the West dam with lower volumes mined and lower run of mine tailings from Rustenburg operations which impacted recoveries. Lower volume and industry-wide inflationary effects resulted in the AISC in H2 2022 increasing by 40% to R11,886/4Eoz (US$686/4Eoz), which remains the lowest in the Group.

The K4 project
The K4 project performed well and remains within schedule at 34% completion with the following milestones achieved:
•First reef tonnes were hoisted in May 2022
•Reef tonnes hoisted for H2 2022 of 48,670 tonnes with production of 3,984 4Eoz
•K4 development build-up in support of the steady state operation is increasing with primary waste metres developed in H2 2022 of 3,475 metres and primary reef development of 1,719 metres. Merensky ore pass rehabilitation is progressing in line with schedule
•Surface infrastructure is well advanced
•Over 1000 employees on site which is set to double in the next year
•Project capital spent in 2022 was R924 million (US$56 million) in line with budget with R1.1 billion (US$69 million) spent to date. K4 has another year of planned high capital expenditure in 2023 (R920 million/US$58 million) which will then taper off


SA gold operations
The SA gold operations (excluding DRDGOLD) were significantly affected by the industrial action and the lockout of employees, which resulted in total closure of the operations between March and June 2023. The suspension of production and processing at the Beatrix operations for safety purposes including reinforcement of the tailings facility during Q1 2022 was a contributing factor to a 77% decline in production (excluding DRDGOLD) for H1 2022 compared to H1 2021. Production for the second half of the year improved relative to H1 2022, but still substantially lower than for H2 2021, due to the phased resumption of safe production. Normalised production rates were achieved during Q4 2022.

Gold production from the SA gold operations (including DRDGOLD) for 2022 declined by 42% tot 19,301kg (620,541oz) year-on-year. Production from the SA gold operations (excluding DRDGOLD) decreased by 50% to 13,736kg (441,623oz). Production from DRDGOLD declined by 1% year-on-year to 5,565kg (178,919oz) with the yield improving 9% to 0.21g/t due to the last stage clean-up for many sites at East Rand gold operations (ERGO) resulting in lower tonnage but higher grade, compensating for a 9% decline in tonnes milled.

AISC for the SA gold operations (including DRDGOLD) for 2022 increased by 58% to R1,268,360/kg (US$2,410/oz) compared with 2021, primarily due to significantly lower production. AISC for the SA gold operations (excluding DRDGOLD) increased 76% year-on-year to R1,461,956kg (US$2,778/oz) for 2022.

Project capital at the SA gold operations (including DRDGOLD) increased by 178% to R1.3 billion (US$80 million) with project capital spent at Kloof on the Kloof 4 deepening project increasing by 6% year-on-year to R210 million (US$13 million) and capital invested at Burnstone project increasing by 402% to R934 million (US$57 million). Capital expenditure at the SA gold operations (excluding DRDGOLD) on ORD and sustaining capital will remain elevated for 2023 in order to restore operational flexibility arising from significant operational disruptions during 2022.

Project capital at DRDGOLD increased by 164% to R124 million (US$8 milion) with spending on the Phase 1 20MW solar project and related infrastructure at ERGO which is expected to be operational in 6-9 months. Phase 2 is an additional 40MW with battery backup (160MW) estimated to be completed 12-18 months after Phase 1.

The average rand gold price received in 2022 was flat in US dollars but the average rand gold price increased by 11% to R946,073/kg (US$1,798/oz), due to depreciation of the rand relative to the US dollar. Despite this, lower production for 2022 resulted in a R8.7 billion swing in adjusted EBITDA from the SA gold operations (including DRDGOLD) with adjusted EBITDA declining from R5.1 billion (US$346 million) for 2021 to a loss of R3.5 billion (US$219 million) or negative 20% adjusted EBITDA margin for 2022. Given the improved outlook for the gold price and recent rand weakness resulting in spot averaging over R1 million/kg year-to-date, together with an expected period of operational stability, the outlook for the SA gold operations for 2023 is very positive.

Production for H2 2022 (including DRDGOLD) decreased by 23% to 13,339kg (428,859oz) with production (excluding DRDGOLD) of 10,608kg (341,055oz) 26% lower as a result of the phased start-up following the industrial action, as well as the impact of load curtailment, the intensity of which increased towards year end. AISC for the SA gold operations (including DRDGOLD) for H2 2022 increased by 38% to R1,124,737/kg (US$2,019/oz), whilst AISC for the SA gold operations (excluding DRDGOLD) increased by 44% to R1,215,786/kg (US$2,182/oz), primarily due to lower gold sold.

Production from Driefontein in 2022 declined by 47% to 4,893kg (157,314oz) due to the industrial action and the subsequent phased ramp-up during H2 2022 with a concomitant 74% increase in AISC to R1,378,868/kg (US$2,620/oz). Underground production from Driefontein for H2 2022 decreased by 31% to 3,163kg (101,693oz) year-on-year due to 21% lower tonnes milled due to the phased production build up. Underground grades declined by 14% due to a lower production contribution from the higher grade 1 and 4 shafts, which should normalise during 2023. Surface tons milled declined by only 6% but grade improved by 8% due to additional sources of material identified as part of the surface clean-up process. Surface material from the Kloof operations was also toll treated at the Driefontein metallurgical plant during 2022. This enabled the surface operations to increase production by 1% year-on-year in H2 2022 to 240kg (7,716oz). AISC for H2 2022 increased by 51% to R1,219,187/kg (US$2,188/oz) due to lower volumes sold and inflationary impacts. Whilst ORD declined by 12% due to less development, sustaining capital increased by 23% due to the several electrical upgrades and lamproom projects being commissioned in the latter part of 2022.

Production from Kloof declined by 55% in 2022 to 4,920kg (158,182oz) with AISC increasing by 85% to R1,592,030/kg (US$3,025/oz). Surface production at Kloof declined by 55% year-on-year to 620kg (19,933oz) due to the steady depletion of available reserves. Underground production from the Kloof operation for H2 2022 decreased by 35% to 3,284kg (105,583oz) due to 22% lower tonnes milled and a 16% lower average yield due to a proportionately lower tonnage contribution from the higher-grade 4 and 8 Shafts. Surface production at Kloof decreased by 24% to 420kg (13,503oz) in H2 2022 due to the industrial action, a steady depletion of available reserves as well as a change to the surface contractor which resulted in lower volumes during the startup. AISC at Kloof in H2 2022 was consequently 49% higher at R1,309,129/kg (US$2,350/oz), for the same reasons as at Driefontein. Both ORD and sustaining capital decreased during H2 2022 (due to lower expenditure on the K8 development project and K1-K3 integration project) by 11% and 14% respectively. Project capital at Kloof increased by 45% to R155 million (US$9 million) with the delivery of major underground cooling equipment. The K4 sub-vertical shaft
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 11


was due to be completed in 2024, however the project has been re-evaluated with the 47 level now excluded from the initial scope. Capital expenditure of R260 million (US$16 million) remains to be spent in 2023 and 2024 which will complete the project.

Gold production in 2022 from the Beatrix operation declined by 54% to 2,913kg (93,655oz) as a result of safety stoppages at the end of 2021, remediation of the TSF and the effects of the industrial action and subsequent ramp-up of production. As a result of primarily lower volumes, AISC increased by 83% in 2022 to R1,573,006/kg (US$2,989/oz). Due to ongoing losses at the Beatrix 4 shaft, a Section 189A process is currently ongoing regarding the possible restructuring of this shaft which accounted for approximately 20% of Beatrix's production in 2023.

Gold production from the Beatrix operation decreased by 15% in H2 2022 compared to H2 2021. Production for H2 2022 benefited from approximately 521kg (16,751oz) of ore which was stockpiled during the reinforcing of the TSF before the industrial action began and processed following the end of industrial action on 9 June 2022 in addition to production from underground. Gold production from surface sources decreased by 65% to 42kg (1,350oz) due to the declining payable reserves. AISC for H2 2022 increased by 39% year-on-year to R1,171,844/kg (US$2,103/oz). ORD and sustaining capital were 25% and 23% lower year-on-year respectively due to the production ramp-up with the ORD also reduced at Beatrix 4, which is subject to a Section 189 process.

Surface gold production from the Cooke operation for 2022 declined by 13% in 2022 to 1,010kg (32,472oz) with a concomitant rise of 22% in AISC to R907,407/kg (US$1,724/oz). Surface gold production for H2 2022 increased by 14% year-on-year to 656kg (21,091oz) due to a 1% increase in tonnes milled and yield which was 13% higher due to the milling of higher grade 3rd party material on a toll basis instead of our own reserves. Toll milling has been planned for the next 2-3 years. Despite the higher inflationary input costs including an 18% increase in the purchasing of toll material from third parties, AISC in H2 2022 only rose by 8% to R867,987/kg (US$1,558/oz) due to the higher amount of gold sold. Care and maintenance costs at Cooke operations increased by 25% to R380 million (US$22 million) due to additional security cost to prevent vandalism and preparation cost for the plug installation at Cooke 1 shaft.

DRDGOLD production was only 1% lower for 2022 at 5,565kg (178,919oz) with an 9% increase in yield offsetting a 9% decline in tonnes milled as some of the older ERGO sites were depleted. Load curtailment and higher levels of rainfall also impacted production. AISC for 2022 increased by 21% to R804,297/oz (US$1,528/oz) primarily due to lower sales and sustaining capital which increased by 96% to R647 million (US$40 million) reflecting investment at new infrastructure at both the ERGO and Far West Gold Recovery (FWGR) operations.

DRDGOLD tonnes milled decreased by 11% year-on-year in H2 2022 due to load curtailment effects and high rainfall which impacted operations. However with a 7% increase in yield, gold production of 2,731kg (87,804oz) in H2 2022 was only down 5% year-on-year. AISC of R799,421/kg (US$1,435/oz) increased by 20% year-on-year due to 4% less gold sold, industry wide inflationary effects and a 63% increase in sustaining capital, reflecting investment in new infrastructure at the East Rand Gold Operations (ERGO) and Far West Gold Recovery (FWGR) operations. DRDGOLD project capital also increased sharply from R38 million (US$3 million) in H2 2021 to R118 million (US$7 million) in H2 2022 with spending primarily on the solar power plant.

Update on S189 Consultation process at Beatrix and Kloof 1 plant
On 1 November 2022, organised labour and other potentially affected stakeholders were notified that the company would be entering
into consultation in terms of S189A of the Labour Relations Act (S189) regarding the possible restructuring of its SA gold operations pursuant
to ongoing losses experienced at the Beatrix 4 shaft and the impact of depleting mineral reserves to the Kloof 1 plant.

The life of the Beatrix 4 shaft was previously prolonged, following S189 consultations in 2017, which, through the successful adoption of
productivity enhancement and cost containment measures implemented following consultation with stakeholders, enabled it to remain
in operation as long as it made a profit, on average, over any continuous period of three months (after accounting for AISC).

The CCMA facilitation process concluded with the last meeting on 1 February 2023. A close-out meeting is scheduled for 28 February 2023. All efforts are being placed on reducing the number of retrenchments by redeploying employees from loss making to profitable operations.

The Burnstone project
The Burnstone project is 47% complete against a plan of 55%, having been especially impacted by the three-month industrial action at the SA gold operations and the slower than planned recruitment of skilled personnel. In particular, trackless mobile machinery (TMM) personal shortages contributed to the delayed development build-up, TMM delivery was delayed due to industrial action, and a shortage of critical components, extending delivery times. Capital on Burnstone to date is R1.1bn (US$69 million) and guidance of R1.95 billion (US$122 million) in 2023. The latest optimised project evaluation generates a 20% IRR and an NPV of R1.3 billion at a gold price of R800,000/kg.

Notable milestones to date are
•The establishment of the required surface infrastructure is progressing well
•As of year-end 661 people are on site with appointment and training of critical TMM skills gaining momentum
•The required TMM equipment has been received and is in operation
•The 56E central underground workshop was completed and the 60E underground reservoir advanced for completion in early 2023
•Project capital of R934 million (US$57 million) was spent in 2022

The immediate focus remains on establishing the required infrastructure, commissioning the existing metallurgical plant and achieving the required development run rate.

Sandouville
The acquisition of the Sandouville nickel refinery in Le Havre, France was concluded on 4 February 2022. For the eleven months, Sandouville produced 4,839 tonnes of nickel metal, 2,003 tonnes of nickel salts and 153 tonnes of cobalt chloride at a nickel equivalent sustaining costs of R527,676/tNi (US$32,239/tNi). After a strong start post acquisition, with production volumes increasing 10% for H1 2022 compared to H1 2021 and adjusted EBITDA of US$4 million (R60 million), H2 2022 was more challenging. Technical issues in the metal unit affected the overall plant performance with the start-up, after the annual maintenance shutdown during October 2022, taking longer than expected. Costs were impacted by lower volumes and higher electricity and gas prices during H2 2022. Sandouville produced 1,340
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 12


tonnes of nickel metal, 937 tonnes of nickel salts and 43 tonnes of cobalt chloride in H2 2022 at a nickel equivalent sustaining costs of 664,311/tNi (US$38,333/tNi). An adjusted EBITDA loss of US$30million (R492 million) million was incurred for 2022 after H1 2022 produced an adjusted EBITDA of US$4 million(R60 million). In 2022 US$5 million (R90 million) was spent on sustaining capital.

Due to the issues highlighted above Sandouville incurred an adjusted EBITDA loss of US$34million (R553 million) in H2 2022, a notable decline from positive adjusted EBITDA of US$4 million(R60 million) for H1 2022. Spending on sustaining capital in H2 2022 was US$4 million (R61 million).

In parallel with the current plant, Sibanye-Stillwater is conducting feasibility studies on three processes
•Producing battery grade nickel sulphate with the intention of producing 44,000 tonnes per year in two stages
•PGM autocatalysts recycling using European feedstocks
•Battery metals recycling

Further announcements on these developments are expected in due course, when the relevant studies have been concluded.

Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 13



FINANCIAL REVIEW OF THE SIBANYE-STILLWATER GROUP
For the six months ended 31 December 2022 (H2 2022) compared with the six months ended 31 December 2021 (H2 2021)
The reporting currency for the Group is the SA rand (rand/R) and the functional currency of the US PGM operations is the US dollar (US$). Direct comparability of the Group results between the two periods is distorted as the results of the US PGM operations are translated to rand at the average exchange rate, which for H2 2022 was R/US$17.33 or 15% weaker than for H2 2021 (R/US$15.03). The functional currency of the Battery metals operations, comprising of Sandouville refinery and Keliber, is the Euro (€) and the results of Sandouville refinery were translated to rand at the average exchange rate, which for H2 2022 was R/€17.57. Keliber is a project in development phase and development expenses are capitalised in accordance with the Group’s accounting policies to property, plant and equipment.
Group financial performance
Group revenue for H2 2022 decreased by 17% to R67,909 million (US$3,878 million) due to lower sales volumes at all operations and lower average US dollar basket prices received at both the SA and US PGM operations. Group cost of sales, before amortisation and depreciation decreased by 10% to R47,512 million (US$2,721 million) mainly due to the lower production volumes which was partially offset by above inflation cost increases at both the SA PGM and managed SA gold operations. The decrease in revenue caused Group adjusted EBITDA for H2 2022 to decrease by 34% or R9,507 million (US$807 million) to R18,550 million (US$1,045 million). The 15% weaker rand relative to the US dollar partially offset the effect of the lower average basket price at both the SA and US PGM operations. Group amortisation and depreciation decreased by 14% to R3,863 million (US$224 million) following lower production volumes.

The revenue, cost of sales, before amortisation and depreciation, net other cash costs, adjusted EBITDA and amortisation and depreciation are set out in the tables below:
Figures in million - SA rand
RevenueCost of sales, before amortisation and depreciationNet other cash costsAdjusted EBITDAAmortisation and depreciation
H2 2022H2 2021% ChangeH2 2022H2 2021% ChangeH2 2022H2 2021% ChangeH2 2022H2 2021% ChangeH2 2022H2 2021% Change
SA PGM operations33,40637,412(11)(15,499)(16,367)(5)(924)(775)19 16,98320,270(16)(1,256)(1,353)(7)
US PGM underground operations6,0118,622(30)(3,619)(4,216)(14)(83)2(4250)2,3094,408(48)(1,377)(1,427)(4)
US PGM Recycling15,94921,296(25)(15,273)(20,539)(26)——— 676757(11)(2)(2)— 
Managed SA gold operations9,20712,553(27)(9,677)(9,986)(3)(664)(527)26 (1,134)2,040(156)(1,052)(1,615)(35)
DRDGOLD2,6542,4986 (1,938)(1,752)11 (22)(24)(8)694722(4)(79)(98)(19)
Battery Metals operations967—100 (1,506)—100 (99)—100 (638)—100 (97)—100 
Group corporate1
(285)(140)(104)——— (55)—— (340)(140)(143)——— 
Total Group67,90982,241(17)(47,512)(52,860)(10)(1,847)(1,324)40 18,55028,057(34)(3,863)(4,495)(14)

Figures in million - US dollars2
RevenueCost of sales, before amortisation and depreciationNet other cash costsAdjusted EBITDAAmortisation and depreciation
H2 2022H2 2021% ChangeH2 2022H2 2021% ChangeH2 2022H2 2021% ChangeH2 2022H2 2021% ChangeH2 2022H2 2021% Change
SA PGM operations1,8932,476(24)(881)(1,089)(19)(56)(51)10 9561,336(28)(72)(88)(18)
US PGM underground operations337572(41)(207)(282)(27)(5)—— 125290(57)(79)(96)(18)
US PGM Recycling9111,419(36)(872)(1,368)(36)——— 3951(24)——— 
Managed SA gold operations550837(34)(566)(666)(15)(40)(35)14 (56)136(141)(63)(109)(42)
DRDGOLD152166(8)(111)(116)(4)(2)(2)— 3948(19)(5)(7)(29)
Battery Metals operations51—100 (84)—100 (6)—100 (39)—100 (5)—100 
Group corporate1
(16)(9)(78)——— (3)—— (19)(9)(111)——— 
Total Group3,8785,461(29)(2,721)(3,521)(23)(112)(88)27 1,0451,852(44)(224)(300)(25)
1 The effect of the streaming transaction has been included under Group Corporate. Please refer to note 17 of the condensed consolidated provisional financial statements
2 Convenience translations have been applied to convert the rand Income Statement amounts into US dollars using a foreign exchange rate of R17.33 for H2 2022 and 15.03 for H2 2021
Revenue
Revenue from the SA PGM operations decreased by 11% to R33,406 million (US$1,893 million) due to a 16% or 146,215 4Eoz decrease in PGMs sold partially offset by a 4% higher average 4E basket price of R42,188/4Eoz (US$2,434/4Eoz) and a 48% increase in the sale of third-party purchase of concentrate (PoC) ounces. The decrease in 4Eoz sold was the consequence of lower production volumes.
At the US PGM underground operations revenue decreased by 41% to US$337 million (R6,011 million), mainly due to a 35% decrease in mined ounces sold correlated with the lower production achieved and an 8% decrease in the average 2E basket price to US$1,766, partially offset by the 15% weaker rand. The rand average 2E basket price increased by 6% to R30,609/2Eoz, combined with the lower sales volumes resulted in a 30% decrease in rand revenue to R6,011 million. Revenue from the US PGM recycling operation decreased by 36% from US$1,419 million (R21,296 million) to US$911 million (R15,949 million) due to a 17% lower average realised basket price of US$3,274/3Eoz and a 22% decrease in recycled ounces sold. The 15% weaker rand translated into a 25% decrease in recycling revenue to R15,949 million.
Revenue from the managed SA gold operations decreased by 27% to R9,207 million (US$550 million) mainly due to lower gold sold volumes, while production ramped up post the strike, which decreased by 34% or 4,988kg during H2 2022, partially offset by an 11% higher rand gold price of R957,467/kg (US$1,718/oz). Revenue from DRDGOLD increased by 6% to R2,654 million (US$152 million) due to an 11% higher rand gold price received of R960,898/kg (US$1,725/oz), partially offset by 4% lower sales volumes.
The Sandouville refinery (included in the Group's results since the effective date of the acquisition on 4 February 2022) sold 1,388 tonnes of Nickel metal and 876 tonnes of Nickel salts at a nickel equivalent basket price of R427,120/tNi (US$24,646/tNi), generating revenue of R967 million (US$51 million). The tNi produced and sold during H2 2022 was lower when compared to H1 2022 due to planned and unplanned maintenance outages during H2 2022.
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 14


Cost of sales, before amortisation and depreciation
Cost of sales, before amortisation and depreciation at the SA PGM operations decreased by 5% to R15,499 million (US$881 million) mainly attributable to lower mined underground 4E PGM production, which decreased by 12% to 708,107 4Eoz due to lower development and stoping, engineering stoppages, electricity curtailment/load shedding, copper cable theft and reduced productivity while mining through adverse ground conditions (Hex River Fault at Rustenburg and Shear Zone at Kroondal). Surface production volumes excluding third-party PoC were 4% lower at 77,571 4Eoz. Third-party PoC at the Marikana smelting and refining operations increased by 48% to 37,998 4Eoz. PoC material is purchased at a higher cost, than own mined ore, due to the direct correlation to the rand basket price of PGM’s.
Cost of sales, before amortisation and depreciation at the US PGM underground operations decreased by 27% to US$207 million (R3,619 million). Sales volumes decreased by 35% to 180,356 2Eoz with production volumes decreasing by 30% to 191,094 2Eoz, mainly due to various factors at both the Stillwater and the East Boulder mines. Production was impacted at the Stillwater due to the recovery from the June flooding events, labour shortages of miners, lower face availability and an unplanned concentrator outage, while at East Boulder a safety stoppage due to nitrogen dioxide gas exposure, lower grades achieved and cold weather conditions all contributed to lower production. Cost of sales, before amortisation and depreciation at the US PGM recycling operation decreased, in line with revenue, by 36% from US$1,368 million (R20,539 million) to US$872 million (R15,273 million) of which the continued industry wide global slowdown in receipt rates was the significant driver coupled with a lower average US$ basket price resulting in decreased purchasing costs of spent autocatalysts.
Cost of sales, before amortisation and depreciation at the managed SA gold operations decreased by 3% to R9,677 million (US$566 million) due to 26% or 3,740kg lower production mainly attributable to the production build-up process post the strike with the hard stop also causing work areas to degrade, stoping crews not at full complement due to recruitment restrictions in light of the S189 process and seismicity at Kloof, partially offset by above average inflationary increases in costs including labour, diesel and electricity. Cost of sales, before amortisation and depreciation from DRDGOLD increased by 11% to R1,938 million (US$111 million) due to above inflationary cost increases including steel, diesel and electricity.
The Sandouville refinery produced 1,340 tonnes of Nickel metal and 937 tonnes of Nickel salts at a nickel equivalent sustaining cost R664,311/tNi (US$38,333/tNi), contributing R1,506 million (US$84 million) to cost of sales. Production was lower at the Sandouville refinery for H2 2022 as compared to H1 2022 due to both planned and unplanned maintenance outages.
Adjusted EBITDA
Adjusted EBITDA includes other cash costs, care and maintenance costs; lease payments; strike costs and corporate social investment costs (CSI) (refer note 11.1 of the condensed consolidated provisional financial statements for a reconciliation of profit before royalties, carbon tax and tax to adjusted EBITDA). Care and maintenance costs for H2 2022 were R380 million (US$22 million) at Cooke (H2 2021: R304 million or US$20 million); R48 million (US$3 million) at Marikana (H2 2021: R36 million or US$2 million); R6 million (US$0 million) at Kroondal (H2 2021: Rnil or US$nil); R2 million (US$0 million) at Beatrix (H2 2021: Rnil or US$nil) and R1 million (US$nil) at DRDGOLD (H2 2021: Rnil or US$nil). Lease payments of R74 million (US$4 million) (H2 2021: R70 million or US$5 million) are included in line with the debt covenant formula and corporate social investment costs were R77 million (US$4 million) (H2 2021: R206 million or US$14 million).
Adjusted EBITDA at the SA PGM, US PGM (underground), US PGM (recycling) and SA gold operations decreased due to a decrease in sales volumes stemming from lower production, partially offset by higher average rand commodity prices. Adjusted EBITDA at the Sandouville refinery decreased compared to H1 2022, due to lower sales volumes and a lower nickel equivalent average basket price.
Adjusted EBITDA is shown in the graph below:chart-ba92058a0ee94f6aad4a.jpg
Amortisation and depreciation
Amortisation and depreciation at the SA PGM operations decreased by 7% to R1,256 million (US$72 million), at the US PGM underground operations decreased by 18% to US$79 million (R1,377 million) and at the managed SA gold operations decreased by 35% to R1,052 million (US$63 million), all due to lower production volumes. Amortisation and depreciation at DRDGOLD decreased by 19% to R79 million (US$5 million) due to lower tonnes processed and the sale of DRDGOLD's Driefontein 3 plant during H1 2022.
Interest Income
Interest income increased by R36 million (US$3 million decrease) mainly due to an increase in interest received on higher average cash balances (R109 million or US$4 million), interest received on rehabilitation funds (R28 million or US$1 million) and other interest (R4 million or US$0 million), partially offset by a decrease in interest and investment income on other financial assets.
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 15


Finance expense
Finance expense increased by R143 million (US$2 million decrease) to R1,378 million (US$80 million) mainly due to a R178 million (US$8 million) net increase in interest on borrowings, R29 million (US$1 million) increase in interest unwinding on the Anglo deferred payment, R18 million (US$0 million) increase in the unwinding of the Marikana dividend obligation, R21 million (US$0 million) increase in the unwinding of the finance costs on the deferred revenue transactions, R6 million (US$0 million) increase in interest on the occupational healthcare obligation, all partially offset by decreases of R68 million (US$5 million) in the unwinding of amortised cost on borrowings, R1 million (US$3 million) in unwinding of the environmental rehabilitation obligation and other interest of R40 million (US$3 million). Refer to note 3 of the condensed consolidated provisional financial statements for a breakdown of finance expenses.
Loss on financial instruments
The net loss on financial instruments of R3,880 million (US$235 million) for H2 2022 compared with the loss of R5,437 million (US$367 million) for H2 2021, represents a period-on-period decreased net loss of R1,557 million (US$132 million). The net loss for H2 2022 is mainly attributable to fair value losses on the revised cash flows of the Rustenburg deferred payment to Anglo American Platinum Limited (Anglo) of R773 million (US$45 million), Burnstone debt of R776 million (US$45 million), Rustenburg and Marikana operations' BEE cash-settled share-based payment obligations of R985 million (US$57 million) and R875 million (US$50 million) respectively, Marikana dividend obligation of R625 million (US$36 million) and the Palladium hedge contract of R150 million (US$9 million), partially offset by fair value gains on other investments of R129 million (US$7 million). Refer to note 4 of the condensed consolidated provisional financial statements for a breakdown of the loss on financial instruments.
Mining and income tax
The mining and income tax expense decreased by 30% to R3,296 million (US$179 million) which is attributable to the Group’s decreased profitability. The current tax expense decreased by 23% to R4,345 million (US$246 million) and the deferred tax expense increased in H2 2022 by 7% to R1,049 million (US$67 million). The effective tax rate of the Group decreased from 36% to 33% in H2 2022 mainly due to deferred tax assets not recognised relating to the Burnstone project, partially offset by deferred tax assets re-recognised (increased the effective tax rate by 4%).
The Group’s effective tax rate for H2 2022 is 5% higher than the South African statutory company tax rate of 28%. The higher effective tax rate is mainly attributable to the impact of the following: non-deductible loss on fair value of financial instruments of 9% or R906 million (US$52 million), decrease due to a change in the estimated long-term deferred tax rate of 3% or R270 million (US$16 million), non-deductible finance expense of 1% or R104 million (US$6 million) and non-deductible transaction costs of 1% or R76 million (US$4 million); partially offset by unrecognised deferred tax assets re-recognised or utilised of 4% or R372 million (US$21 million), net other non-taxable income and non-deductible expenditure of 1% or R140 million (US$8 million), non-taxable share of results of equity accounted investees of 2% or R145 million (US$8 million) and an increase due to a rate adjustment to the South African gold mining tax formula of 1% or R77 million (US$4 million).
Non-recurring items
Strike costs
During H2 2022 the SA gold operations incurred strike related costs of R34 million (US$2 million).
Flood costs
On 13 June 2022 the US PGM operations experienced a significant flood event which occurred at the Stillwater mining operations in Montana and during H2 2022 incurred costs relating to this incident of R44 million (US$3 million).
Restructuring costs
Restructuring costs of R327 million (US$19 million) for H2 2022 included retrenchment costs of R314 million (US$18 million) and professional fees of R13 million (US$1 million) at the SA gold and SA PGM segments, respectively. The retrenchment costs of R314 million (US$18 million) for H2 2022 mainly included the section 189 costs at SA gold operations relating to Beatrix (R285 million or US$16 million) and Kloof (R27 million or US$2 million).
Transaction costs
Transaction costs of R43 million (US$3 million) for H2 2022 consisted of project and acquisition related legal and advisory fees.
Loss on deconsolidation
During H2 2022 the Group made a loss of R309 million (US$18 million) when it deconsolidated the Bapo Ba Mogale Local Economic Development Trust (Bapo Trust) arising from changes in the Trust Deed registered on 8 August 2022 which resulted in a loss of control.
Gain on disposal of Lonmin Canada
The Group recorded a gain on disposal of R145 million (US$8 million) relating to Lonmin Canada Incorporated.
Borrowings and net debt
Gross debt increased by 9% from R20,887 million (US$1,282 million) at 30 June 2022 to R22,728 million (US$1,334 million) at 31 December 2022. The higher outstanding debt was mainly due to the fair value adjustment on Burnstone debt for R776 million (US$45 million) and a net increase of R952 million (US$55 million) on US dollar denominated debt due to the foreign exchange impact of a 13% weaker rand since 30 June 2022. Net debt, excluding the Burnstone Debt which has no recourse to Sibanye-Stillwater, is in a net cash position of R5,853 million (US$344 million) at 31 December 2022. The Group’s cash balance (excluding cash of Burnstone) decreased by 4% to R26,041 million (US$1,529 million) since 30 June 2022, and includes US$726 million (R12,368 million) held by the US PGM operations mainly due to cash received from the issue of the 2026 and 2029 Notes. Refer to note 11 of the condensed consolidated provisional financial statements for a roll forward of the gross debt for the year ended 31 December 2022.
The Group’s total equity increased to R91,004 million (US$5,342 million) at 31 December 2022 mainly due to total comprehensive income of R21,349 million (US$955 million) for the year, non-controlling interest recognised with the acquisition of Keliber Oy for R1,219 million (US$74 million) and equity settled share based payment reserve of R24 million (US$2 million). These increases were partially offset by dividends paid (R9,453 million or US$578 million), transactions with shareholders (R3,452 million or US$211 million) and the sale of Lonmin Canada Incorporated (R14 million or US$1 million).
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 16


The graph below illustrates the Group's Gross debt/Cash/Total equity for H2 2022, H1 2022 and H2 2022:
chart-2ddd0aa55c5f4ac982fa.jpg
Purchase of concentrate (PoC)
The Marikana operation has agreements in place to purchase PGM concentrates from third parties. The processing of third party material allows better utilisation of smelting and refining capacity. During H2 2022 the Marikana operation purchased 37,998 4Eoz (H2 2021: 25,705 4Eoz) in concentrate from third parties.
US PGM recycling
The US PGM recycling operation delivered a strong financial performance for H2 2022 notwithstanding the operational challenges experienced by the US region and worldwide reduced autocatalyst receipt rates. Delivery rates were impacted by a constrained autocatalyst market throughout H2 2022, which resulted in a decline in receipt rates from customers. As a result, inventory continues to remain below normalised levels while the segment continues to focus on proactive collector engagements to shore up volumes. Working capital for H2 2022 decreased from US$511 million (R8,324 million) at 30 June 2022 to US$258 million (R4,394 million) at 31 December 2022 and the segment continues to remain self-funded with no lines of credit drawn. At 31 December 2022, recycling inventory approximated 49 tonnes (H1 2022: 124 tonnes) containing an estimated 5koz (3E) (H1 2022: 12koz (3E)). The graph below, in relation to the average basket price for purchased 3E PGM content of spent autocatalyst, indicates the quarterly cash advances (on receipt of spent catalysts) and final payment (on final assay) to recycle suppliers, and the cash receipts when the 3E PGM metal is outturned, illustrating the 41% decrease in recycle working capital from 1 January 2022 (US$441 million) to 31 December 2022 (US$258 million).

chart-d9ac08f3d5084360a9ba.jpg

Liquidity and capital resources
Cash flow analysis
Sibanye-Stillwater defines adjusted free cash flow as net cash from operating activities, before dividends paid, net interest paid and deferred revenue advance received, less additions to property, plant and equipment.



Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 17



The following table shows the adjusted free cash flow per operating segment:
Figures in million - SA randSix months endedYear ended
H2 2022H1 2022H2 2021FY 2022FY 2021
US PGM operations3,1791,4058,0004,5848,148
SA PGM operations2,34311,1568,25013,49922,550
SA gold operations1
1,733(7,744)4,409(6,011)7,782
Battery Metals(1,155)(662)—(1,817)—
Group corporate(313)(433)(533)(746)(1,032)
Adjusted free cash flow2
5,7873,72220,1269,50937,448
1Included in the adjusted free cash flow of the SA gold segment is the Group treasury and shared services function, together referred to as gold corporate. The SA PGM operations, through the intercompany working capital accounts which eliminate on consolidation, contributed R5,920 million (US$342 million) during H2 2022 (H1 2022: received R2,784 million or US$181 million, contributed H2 2021: R4,331 million or US$288 million and FY 2021: R8,049 million or US$544 million) to the working capital increase (inflow) included in the SA gold operations
2 Non-IFRS measures such as adjusted free cash flow as defined above and reconciled below, are the responsibility of the Group’s Board of Directors and are presented for illustration purposes only, and because of its nature, adjusted free cash flow should not be considered as a representation of financial performance under IFRS

The US PGM operations generated adjusted free cash flow of US$183 million (R3,179 million). Net cash inflow from operating activities amounted to US$338 million (R5,856 million) and includes a net decrease (inflow) of US$219 million (R3,792 million) in working capital, which was mainly attributable to the decrease in recycle inventory, a net increase (outflow) in the intercompany working capital accounts of US$1 million (R23 million) and taxes paid of US$12 million (R202 million). The adjusted free cash flow includes additions to property, plant and equipment of US$186 million (R3,231 million).
Adjusted free cash flow from the SA PGM operations was R2,343 million (US$135 million). Net cash inflow from operating activities amounted to R1,574 million (US$91 million) and includes a net increase (outflow) of R1,652 million (US$95 million) in working capital, payments of R4,705 million (US$271 million) towards royalty and income taxes, dividends paid of R4,164 million (US$240 million) and a net increase (outflow) of R5,920 million (US$342 million) in the intercompany working capital accounts. The adjusted free cash flow includes additions to property, plant and equipment of R2,943 million (US$170 million).
The SA gold operations generated adjusted free cash flow of R1,733 million (US$100 million). Net cash inflow from operating activities amounted to R8,521 million (US$492 million) after a net increase (outflow) of R216 million (US$12 million) in working capital, net dividends received of R3,994 million (US$230 million), payments of R149 million (US$9 million) towards royalty and income taxes and a decrease in the intercompany working capital accounts receivable of R5,869 million (US$339 million). The adjusted free cash flow includes additions to property, plant and equipment of R2,963 million (US$171 million).
The Battery metals operations generated negative adjusted free cash flow of R1,155 million (US$67 million). Net cash outflow from operating activities amounted to R596 million (US$34 million) after a net decrease (inflow) of R120 million (US$7 million) in working capital and a net decrease (inflow) of R21 million (US$1 million) in the intercompany working capital accounts. The adjusted free cash flow includes additions to property, plant and equipment of R616 million (US$36 million) of which R555 million (US$32 million) relates to capital expenditure on the Keliber project.
Group corporate’s negative adjusted free cash flow was R313 million (US$18 million). Net cash outflow from operating activities amounted to R4,201 million (US$242 million) and includes a net decrease (inflow) of R53 million (US$3 million) in the intercompany working capital accounts.
The following table shows a reconciliation from net cash from operating activities to adjusted free cash flow:
Figures in million - SA randSix months endedYear ended
H2 2022H1 2022H2 2021FY 2022FY 2021
Net cash from operating activities11,1544,38918,96015,54332,256
Adjusted for:
Dividends paid4,0755,3788,5169,45318,176
Net interest (received)/paid313123(145)436(179)
Deferred revenue advance received—(24)(51)(24)(65)
Less:
Additions to property, plant and equipment(9,755)(6,144)(7,154)(15,899)(12,740)
Adjusted free cash flow5,7873,72220,1269,50937,448
Non-IFRS measures such as adjusted free cash flow as defined and reconciled above, are the responsibility of the Group’s Board of Directors and are presented for illustration purposes only, and because of its nature, adjusted free cash flow should not be considered as a representation of financial performance under IFRS
Cash and cash equivalents at 31 December 2022 decreased to R26,076 million (US$1,531 million) from R27,248 million (US$1,673 million) at 30 June 2022 (H2 2021: cash at 31 December 2021 increased to R30,292 million or US$1,900 million from R26,097 million or US$1,829 million at 30 June 2021), after net cash from operating activities of R11,154 million (US$664 million) (H2 2021: R18,960 million or US$1,267 million), net cash used in investing activities of R9,850 million (US$574 million) (H2 2021: R8,746 million or US$582 million) and net cash used in financing activities of R3,424 million (US$208 million) (H2 2021: R6,795 million or US$458 million).


DIVIDEND DECLARATION
The Sibanye-Stillwater board of directors has declared and approved a cash dividend of 122 SA cents per ordinary share (US 6.74 cents* per share or US 26.98 cents* per ADR) or approximately R3,453 million (US$191 million*) in respect of the six months ended 31 December 2022 (“Final dividend”). The Board applied the solvency and liquidity test and reasonably concluded that the company will satisfy that test immediately after completing the proposed distribution.
Sibanye-Stillwater dividend policy is to return at least 25% to 35% of normalised earnings to shareholders. Normalised earnings is defined as earnings attributable to the owners of Sibanye-Stillwater excluding gains and losses on financial instruments and foreign exchange differences, impairments, gain/loss on disposal of property, plant and equipment, occupational healthcare expenses, restructuring costs, transactions costs, share-based payment expenses on BEE transactions, gains on acquisitions, net other business development costs, share of results of equity-accounted investees, all after tax and the impact of non-controlling interest, and changes in the estimated deferred tax rate.
The total dividend declared of 260 cents (Final dividend: 122 SA cents and Interim dividend: 138 SA cents) equates to 35% of normalised earnings for the year ended 31 December 2022.

The final dividend will be subject to Dividends Withholding Tax. In accordance with paragraphs 11.17 (a) (i) and 11.17 (c) of the JSE Listings Requirements the following additional information is disclosed:
•The dividend has been declared out of income reserves
•The local Dividends Withholding Tax rate is 20% (twenty per centum)
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 18


•The gross local dividend amount is 122.00000 SA cents per ordinary share for shareholders exempt from the Dividends Tax
•The net local dividend amount is 97.60000 SA cents (80% of 122 SA cents) per ordinary share for shareholders liable to pay the Dividends Withholding Tax
•Sibanye-Stillwater currently has 2 830 370 251 ordinary shares in issue
•Sibanye-Stillwater’s income tax reference number is 9723 182 169

Shareholders are advised of the following dates in respect of the final dividend:
Final dividend:                 122 SA cents per share
Declaration date:                 Tuesday, 28 February 2023
Last date to trade cum dividend:         Monday, 20 March 2023
Shares commence trading ex-dividend:     Wednesday, 22 March 2023
Record date:                 Friday, 24 March 2023
Payment of dividend:             Monday, 27 March 2023

Please note that share certificates may not be dematerialised or rematerialised between Wednesday, 22 March 2023 and Friday, 24 March 2023 both dates inclusive.

To holders of American Depositary Receipts (ADRs):
•Each ADR represents 4 ordinary shares;
•ADRs trade ex-dividend on the New York Stock Exchange (NYSE): Thursday, 23 March 2023;
•Record Friday, 24 March 2023;
•Approximate date of currency conversion: Monday, 27 March 2023; and
•Approximate payment date of dividend: Monday, 10 April 2023

Assuming an exchange rate of R18.0887/US$1*, the dividend payable on an ADR is equivalent to 26.98 United States cents for Shareholders liable to pay dividend withholding tax. However, the actual rate of payment will depend on the exchange rate on the date for currency conversion.

* Based on an exchange rate of R18.0887/US$ at 20 February 2023 from IRESS. However, the actual rate of payment will depend on the exchange rate on the date for currency conversion

MINERAL RESOURCES AND MINERAL RESERVES
On 17 February 2023, Sibanye-Stillwater reported an update of its Mineral Resources and Mineral Reserves as at 31 December 2022, the salient points of which are summarised below.
•A maiden lithium (Li) Mineral Reserve of 193.6kt of Lithium Carbonate Equivalent (LCE), and a 26% increase in Li Mineral Resources to 243.5kt of LCE:
–Continuous execution and delivery on the Group’s green metals strategy with an increased focus on battery metals, has led to an increase in attributable ownership of the Keliber project in Finland from 26.6% to 84.96%
–The declaration of Mineral Reserves follows the completion of a positive Feasibility Study (FS) and the approval for the construction of the Keliber project
–Ongoing, successful exploration at the large and prospective mineral tenement holdings at Keliber also contributed an additional 30.4kt of attributable LCE Mineral Resource

•2E PGM Mineral Reserves of 26.3Moz and Mineral Resources of 56.0Moz following the repositioning of our US PGM operations and consequent update of the life of mine (LoM) plans:
–The Mineral Reserves supports a 42 year LoM, building up to 700koz of annual production by 2026
–The estimates reflects minor year-on-year decreases of 3.6% and 7.1% respectively, due to enhanced estimation methodologies, with considerable Mineral Reserve upside potential remaining, based on the very large Inferred Resource base of 44.8Moz

•31.4Moz 4E PGM Mineral Reserves at our SA PGM operations, and a 1.9% increase in Mineral Resources to 135.6Moz:
–The 2.3% decrease in Mineral Reserves was principally driven by depletion of 2.7Moz during 2022, partly off-set by the conclusion of a positive FS at the 50% owned Mimosa North Hill project (+1.5Moz), which is currently under board consideration for construction
–The large 4E PGM Mineral Resources base at the SA PGM operations provide significant opportunity to increase future Mineral Reserves, extending the life of the operations and unlocking substantial value, subject to the necessary studies being completed and a supportive investment environment
•Stable Mineral Reserves of 12.9Moz (-0.6%), and Mineral Resources of 55.5Moz (-8.2%) at our SA gold operations and projects (including DRDGOLD)

The Group reports its Mineral Resources and Mineral Reserves in accordance with the rules and regulations promulgated by each of the United States Securities and Exchange Commission (SEC) and the JSE at all managed operations, development, and exploration properties. In support of the preliminary disclosure set out in this announcement, the Group expects to file the information required by Subpart 1300 of Regulation S-K under the Securities Act of 1933, including a Technical Report Summary in respect of the Keliber project, with its annual report on Form 20-F on or about 24 April 2023. A JSE-compliant version of this announcement can be located at https://www.sibanyestillwater.com/download/reserves-resources-dec2022-jse.

CHANGE IN BOARD OF DIRECTORS
There was no change to the Board of Sibanye Stillwater Limited during the six month period ended 31 December 2022.

Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 19


SALIENT FEATURES AND COST BENCHMARKS - SIX MONTHS

SA and US PGM operations
US OPERA-TIONS
SA OPERATIONS
Total US and SA PGM1
Total US PGM
Total SA PGM1
Rustenburg
Marikana1
KroondalPlat MileMimosa
Attributable
Under-
ground2
TotalUnder-
ground
SurfaceUnder-
ground
SurfaceUnder-
ground
SurfaceAttribu-tableSurfaceAttribu-table
Production
Tonnes milled/treated000'tDec 202218,867 527 18,339 8,532 9,807 3,065 2,803 3,175 1,818 1,604 5,186 687 
Jun 202218,932 627 18,305 8,459 9,846 2,972 2,807 3,140 1,880 1,647 5,159 700 
Dec 202120,361 710 19,651 9,183 10,468 3,220 2,920 3,499 2,043 1,756 5,505 708 
Plant head gradeg/tDec 20222.26 12.43 1.97 3.29 0.82 3.33 1.05 3.66 0.87 2.36 0.67 3.52 
Jun 20222.31 12.58 1.96 3.26 0.84 3.27 1.03 3.67 0.86 2.33 0.72 3.53 
Dec 20212.44 13.17 2.05 3.42 0.85 3.43 1.08 3.89 0.87 2.39 0.73 3.58 
Plant recoveries%Dec 202275.43 90.31 72.67 84.89 30.00 86.29 43.20 86.86 25.83 82.51 21.09 74.52 
Jun 202274.95 90.47 71.48 84.79 27.11 86.58 36.96 87.00 24.87 82.12 20.77 72.45 
Dec 202176.05 89.96 72.69 85.32 28.15 87.03 34.30 87.03 26.42 83.77 23.73 71.83 
Yieldg/tDec 20221.71 11.23 1.43 2.79 0.25 2.87 0.45 3.18 0.22 1.95 0.14 2.62 
Jun 20221.73 11.38 1.40 2.76 0.23 2.83 0.38 3.19 0.21 1.91 0.15 2.56 
Dec 20211.85 11.85 1.49 2.92 0.24 2.99 0.37 3.39 0.23 2.00 0.17 2.57 
PGM production3
4Eoz - 2EozDec 20221,034,752 191,094 843,658 766,087 77,571 283,148 40,877 324,518 13,136 100,441 23,558 57,980 
Jun 20221,053,845 230,039 823,806 751,717 72,089 270,515 34,357 322,333 12,930 101,315 24,802 57,554 
Dec 20211,214,072 272,099 941,973 861,446 80,527 309,042 34,778 380,832 15,095 113,035 30,654 58,537 
PGM sold4
4Eoz - 2EozDec 2022995,750 180,356 815,394 287,512 35,639 312,517100,441 23,558 55,727 
Jun 20221,084,907 238,200 846,707 266,589 35,054 364,441101,315 24,802 54,506 
Dec 20211,237,050 277,562 959,488 311,967 31,680 418,546113,035 30,654 53,606 
Price and costs5
Average PGM basket price6
R/4Eoz - R/2EozDec 202239,966 30,609 42,188 43,092 32,789 42,22844,781 33,776 33,348 
Jun 202240,240 29,799 43,379 44,640 29,326 43,59546,368 34,311 33,418 
Dec 202137,758 28,755 40,517 41,323 27,581 40,47744,108 32,984 31,756 
Average PGM basket price6US$/4Eoz - US$/2EozDec 20222,306 1,766 2,434 2,487 1,892 2,4372,584 1,949 1,924 
Jun 20222,613 1,935 2,817 2,899 1,904 2,8313,011 2,228 2,170 
Dec 20212,512 1,913 2,696 2,749 1,835 2,6932,935 2,195 2,113 
Operating cost7
R/tDec 20221,091 7,687 894 1,905 2901,4111,103 60 1,524 
Jun 20221,007 6,073 827 1,832 191 1,326998 53 1,247 
Dec 2021959 5,310 795 1,711 204 1,267935 55 1,177 
Operating cost7US$/tDec 202263 444 52 110 17 8164 3 88 
Jun 202265 394 54 119 12 8665 3 81 
Dec 202164 353 53 114 14 8462 4 78 
Operating cost7R/4Eoz - R/2EozDec 202220,304 21,220 20,081 20,618 19,889 20,87317,612 13,117 18,075 
Jun 202218,430 16,554 18,994 20,128 15,601 19,85016,217 11,088 15,168 
Dec 202116,302 13,855 17,056 17,826 17,109 17,73314,518 9,852 14,230 
Operating cost7US$/4Eoz - US$/2EozDec 20221,172 1,224 1,159 1,190 1,148 1,2041,016 757 1,043 
Jun 20221,197 1,075 1,233 1,307 1,013 1,2891,053 720 985 
Dec 20211,085 922 1,135 1,186 1,138 1,180966 655 947 
Adjusted EBITDA Margin8
%Dec 202238 51 525153 28 46 
Jun 202251 55 565559 34 61 
Dec 202151 54 575450 27 50 
All-in sustaining cost9
R/4Eoz - R/2EozDec 202222,671 31,880 20,431 20,71422,03116,139 11,886 22,594 
Jun 202218,824 21,036 18,160 19,05418,94914,874 9,878 15,029 
Dec 202116,703 15,619 17,037 18,83517,06913,774 8,482 15,853 
All-in sustaining cost8US$/4Eoz - US$/2EozDec 20221,308 1,840 1,179 1,1951,271931 686 1,304 
Jun 20221,222 1,366 1,179 1,2371,230966 641 976
Dec 20211,111 1,039 1,134 1,2531,136916 564 1,055
All-in cost9
R/4Eoz - R/2EozDec 202224,039 36,139 21,096 20,71423,58016,139 11,886 22,594 
Jun 202219,770 23,340 18,699 19,05420,18114,874 9,878 15,029 
Dec 202117,915 20,007 17,270 18,83517,58913,774 8,482 15,853 
All-in cost8US$/4Eoz - US$/2EozDec 20221,387 2,085 1,217 1,1951,361931 686 1,304 
Jun 20221,284 1,516 1,214 1,2371,310966 641 976 
Dec 20211,192 1,331 1,149 1,2531,170916 564 1,055 
Capital expenditure5
Total capital expenditureRmDec 20226,172 3,230 2,942 7562,012158 16 570 
Jun 20224,346 2,185 2,161 6201,420115 6 294 
Dec 20214,635 2,256 2,379 7011,499165 14 299 
Total capital expenditureUS$mDec 2022356 186 170 441169 1 33 
Jun 2022282 142 140 40927 — 19 
Dec 2021308 150 158 4710011 1 20 
Average exchange rate for the six months ended 31 December 2022, 30 June 2022 and 31 December 2021 was R17.33/US$, R15.40/US$ and R15.03/US$, respectively
Figures may not add as they are rounded independently
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 20


1The Total US and SA PGM, Total SA PGM and Marikana excludes the production and costs associated with the purchase of concentrate (PoC) from third parties. For a reconciliation of the Operating cost, AISC and AIC excluding third party PoC, refer to “Reconciliation of operating cost excluding third party PoC for Total US and SA PGM, Total SA PGM and Marikana - Six Months” and “Reconciliation of AISC and AIC excluding third party PoC for Total US and SA PGM, Total SA PGM and Marikana – Six Months”
2The US PGM operations’ underground production is converted to metric tonnes and kilograms, and performance is translated into rand. In addition to the US PGM operations’ underground production, the operation treats recycling material which is excluded from the statistics shown above and is detailed in the PGM recycling table below
3Production per product – see prill split in the table below
4PGM sold includes the third party PoC ounces sold
5The Total US and SA PGM and Total SA PGM operations’ unit cost benchmarks and capital expenditure exclude the financial results of Mimosa, which is equity accounted and excluded from revenue and cost of sales
6The average PGM basket price is the PGM revenue per 4E/2E ounce, prior to a purchase of concentrate adjustment
7Operating cost is the average cost of production and operating cost per tonne is calculated by dividing the cost of sales, before amortisation and depreciation and change in inventory in a period by the tonnes milled/treated in the same period, and operating cost per ounce (and kilogram) is calculated by dividing the cost of sales, before amortisation and depreciation and change in inventory in a period, by the PGM produced in the same period
8Adjusted EBITDA margin is calculated by dividing adjusted EBITDA by revenue
9All-in cost is calculated in accordance with the World Gold Council guidance. All-in cost excludes income tax, costs associated with merger and acquisition activities, working capital, impairments, financing costs, one-time severance charges and items needed to normalise earnings. All-in cost is made up of All-in sustaining cost, being the cost to sustain current operations, given as a sub-total in the All-in cost calculation, together with corporate and major capital expenditure associated with growth. All-in sustaining cost per ounce (and kilogram) and All-in cost per ounce (and kilogram) are calculated by dividing the All-in sustaining cost and All-in cost, respectively, in a period by the total 4E/2E PGM produced in the same period. For a reconciliation of cost of sales, before amortisation and depreciation to All-in cost, see “All-in costs - six months”


Mining - PGM Prill split including third party PoC, excluding recycling operations
GROUP PGMSA OPERATIONSUS OPERATIONS
Dec 2022Jun 2022Dec 2021Dec 2022Jun 2022Dec 2021Dec 2022Jun 2022Dec 2021
%%%%%%%%%
Platinum568,119 53 %556,770 52 %634,117 51 %523,939 59 %504,40059 %572,63559 %44,180 23 %52,370 23 %61,482 23 %
Palladium409,584 38 %431,750 40 %500,142 40 %262,670 30 %254,08130 %289,52630 %146,914 77 %177,669 77 %210,616 77 %
Rhodium78,783 7 %74,618 7 %84,248 7 %78,783 9 %74,6189 %84,2489 %
Gold16,264 2 %16,054 1 %21,270 2 %16,264 2 %16,0542 %21,2702 %
PGM production 4E/2E1,072,750 100 %1,079,191 100 %1,239,776 100 %881,656 100 %849,152100 %967,678100 %191,094 100 %230,039 100 %272,098 100 %
Ruthenium125,157 118,711 153,057 125,157 118,711153,057
Iridium31,636 29,865 35,012 31,636 29,86535,012
Total 6E/2E1,229,543 1,227,767 1,427,845 1,038,449 997,7281,155,747191,094 230,039 272,098 
Figures may not add as they are rounded independently

Recycling at US operations
UnitDec 2022Jun 2022Dec 2021
Average catalyst fed/dayTonne14.9 22.9 22.8 
Total processedTonne2,740 4,136 4,201 
TolledTonne— — 23 
PurchasedTonne2,740 4,136 4,177 
PGM fed3Eoz237,441 361,333 352,276 
PGM sold3Eoz281,641 361,560 360,167 
PGM tolled returned3Eoz5,458 1,878 2,050 


Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 21


SA gold operations
SA OPERATIONS
Total SA goldDriefonteinKloofBeatrixCookeDRDGOLD
TotalUnder-
ground
SurfaceUnder-
ground
SurfaceUnder-
ground
SurfaceUnder-
ground
SurfaceSurfaceSurface
Production
Tonnes milled/treated000'tDec 202219,301 2,269 17,032 604 489 736 1,291 929 124 2,286 12,842 
Jun 202216,871 492 16,379 236 205 256 663 — — 1,788 13,723 
Dec 202121,840 2,599 19,241 760 522 944 1,686 895 307 2,260 14,466 
Yieldg/tDec 20220.69 4.08 0.24 5.24 0.49 4.46 0.33 3.02 0.34 0.29 0.21 
Jun 20220.35 5.05 0.21 5.98 0.39 3.97 0.30 — — 0.20 0.21 
Dec 20210.79 4.95 0.23 6.06 0.45 5.33 0.33 3.61 0.39 0.25 0.20 
Gold producedkgDec 202213,339 9,250 4,089 3,163 240 3,284 420 2,803 42 656 2,731 
Jun 20225,962 2,486 3,476 1,411 79 1,016 200 59 9 354 2,834 
Dec 202117,234 12,866 4,368 4,604 237 5,033 550 3,229 121 574 2,886 
ozDec 2022428,859 297,394 131,464 101,693 7,716 105,583 13,503 90,119 1,350 21,091 87,804 
Jun 2022191,683 79,927 111,756 45,365 2,540 32,665 6,430 1,897 289 11,381 91,115 
Dec 2021554,086 413,651 140,434 148,022 7,620 161,815 17,683 103,815 3,890 18,455 92,787 
Gold soldkgDec 202212,378 8,409 3,969 2,961 187 2,947 372 2,501 42 606 2,762 
Jun 20226,481 2,958 3,523 1,503 100 1,199 225 256 9 366 2,823 
Dec 202117,495 13,173 4,322 4,705 223 5,031 529 3,437 121 558 2,891 
ozDec 2022397,962 270,356 127,606 95,198 6,012 94,748 11,960 80,409 1,350 19,483 88,800 
Jun 2022208,369 95,102 113,267 48,323 3,215 38,549 7,234 8,231 289 11,767 90,762 
Dec 2021562,477 423,522 138,955 151,269 7,170 161,750 17,008 110,502 3,890 17,940 92,948 
Price and costs
Gold price receivedR/kgDec 2022958,232 958,069958,421956,351953,795960,898 
Jun 2022922,851 917,031916,433939,623920,765928,091 
Dec 2021860,303 863,028858,273856,661858,423864,407 
US$/ozDec 20221,720 1,7201,7201,7161,7121,725 
Jun 20221,864 1,8521,8511,8981,8601,874 
Dec 20211,780 1,7861,7761,7731,7761,789 
Operating cost1
R/tDec 2022648 4,200 175 5,155 280 4,820 280 3,089 258 233 149 
Jun 2022488 11,624 153 9,191 288 9,563 347 — — 180 135 
Dec 2021528 3,390 141 3,778 238 3,850 200 2,577 221 188 122 
US$/tDec 202237 242 10 297 16 278 16 178 15 13 9 
Jun 202232 755 10 597 19 621 23 — — 12 9 
Dec 202135 226 9 251 16 256 13 171 15 12 8 
R/kgDec 2022937,627 1,030,270 728,051 983,876 570,833 1,080,085 859,524 1,024,260 761,905 810,976 701,208
Jun 20221,379,906 2,300,483 721,519 1,537,208 746,835 2,409,449 1,150,000 18,677,966 4,222,222 909,605 655,963 
Dec 2021669,084 684,828 622,711 623,588 523,207 722,035 614,545 714,153 561,983 738,676 611,920 
US$/ozDec 20221,683 1,849 1,307 1,766 1,025 1,939 1,543 1,838 1,367 1,456 1,259 
Jun 20222,787 4,646 1,457 3,105 1,508 4,866 2,323 37,724 8,528 1,837 1,325 
Dec 20211,385 1,417 1,289 1,290 1,083 1,494 1,272 1,478 1,163 1,529 1,266 
Adjusted EBITDA margin2
%Dec 2022(4)(1)(14)(9)(53)26 
Jun 2022(52)(64)(124)(451)(94)32 
Dec 202118 271615(50)29 
All-in sustaining cost3
R/kgDec 20221,124,737 1,219,1871,309,1291,171,844867,987799,421 
Jun 20221,542,355 1,692,4522,252,8095,415,094969,945808,360 
Dec 2021814,347 807,427876,079845,981802,867667,243 
All-in sustaining cost2US$/ozDec 20222,019 2,1882,3502,1031,5581,435 
Jun 20223,115 3,4184,55010,9371,9591,633 
Dec 20211,685 1,6711,8131,7511,6611,381 
All-in cost3
R/kgDec 20221,200,679 1,219,1871,355,8301,171,844867,987842,143 
Jun 20221,610,091 1,692,4522,290,7305,430,189969,945810,485 
Dec 2021836,639 807,427895,324847,948802,867680,387 
US$/ozDec 20222,155 2,1882,4332,1031,5581,511 
Jun 20223,252 3,4184,62710,9671,9591,637 
Dec 20211,731 1,6711,8531,7551,6611,408 
Capital expenditure
Total capital expenditure4
RmDec 20222,963 805894272— 354 
Jun 20221,595 347391103— 416 
Dec 20212,515 828947368— 183 
Total capital expenditureUS$mDec 2022171 465216— 20 
Jun 2022104 23257— 27 
Dec 2021167 556324— 12 
Average exchange rate for the six months ended 31 December 2022, 30 June 2022 and 31 December 2021 was R17.33/US$, R15.40/US$ and R15.03/US$, respectively
Figures may not add as they are rounded independently
1Operating cost is the average cost of production and operating cost per tonne is calculated by dividing the cost of sales, before amortisation and depreciation and change in inventory in a period, by the tonnes milled/treated in the same period, and operating cost per kilogram (and ounce) is calculated by dividing the cost of sales, before amortisation and depreciation and change in inventory in a period, by the gold produced in the same period
2Adjusted EBITDA margin is calculated by dividing adjusted EBITDA by revenue
3All-in cost is calculated in accordance with the World Gold Council guidance. All-in cost excludes income tax, costs associated with merger and acquisition activities, working capital, impairments, financing costs, one time severance charges and items needed to normalise earnings. All-in cost is made up of All-in sustaining cost, being the cost to sustain current operations, given as a sub-total in the All-in cost calculation, together with corporate and major capital expenditure associated with growth. All-in sustaining cost per kilogram (and ounce) and All-in cost
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 22


per kilogram (and ounce) are calculated by dividing the All-in sustaining cost and All-in cost, respectively, in a period by the total gold sold over the same period. For a reconciliation of cost of sales before amortisation and depreciation to All-in cost, see “All-in costs – Six months”
4Corporate project expenditure, which comprises spend on various Corporate IT projects and the Burnstone project, for the six months ended 31 December 2022, 30 June 2022 and 31 December 2021 was R638 million (US$37 million), R338 million (US$22 million), and R189 million (US$13 million), respectively
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 23


European operations
Sibanye-Stillwater Sandouville refinery
Battery metals split
Dec 2022
Jun 20221
Volumes produced (tonnes)%%
Nickel Salts2
937 41 %1,066 23 %
Nickel Metal1,340 59 %3,499 77 %
Total Nickel production tNi2,277 100 %4,565 100 %
Nickel Cakes3
91 193 
Cobalt Chloride (CoCl2)4
43 113 
Ferric Chloride (FeCl3)4
431 968 
Volumes sales (tonnes)
Nickel Salts2
876 39 %984 21 %
Nickel Metal1,388 61 %3,599 79 %
Total Nickel sold tNi2,264 100 %4,583 100 %
Cobalt Chloride (CoCl2)4
19 145 
Ferric Chloride (FeCl3)4
431 968 


Nickel equivalent basket priceUnitDec 2022
Jun 20221
Revenue from sale of productsRm967 2,173 
Nickel products soldtNi2,264 4,583 
Nickel equivalent average basket priceR/tNi427,120 474,144 
Nickel equivalent average basket priceUS$/tNi24,646 30,789 



Nickel equivalent sustaining costUnitDec 2022
Jun 20221
Cost of sales, before amortisation and depreciationRm1,506 2,125 
Carbon taxRm— — 
Community costsRm— — 
Share-based paymentsRm— — 
Rehabilitation interest and amortisationRm3 3 
LeasesRm2 12 
Sustaining capital expenditureRm61 29 
Less: By-product creditRm(68)(59)
Nickel equivalent sustaining costRm1,504 2,110 
Nickel products soldtNi2,264 4,583 
Nickel equivalent sustaining costR/tNi664,311 460,397 
Nickel equivalent sustaining costUS$/tNi38,333 29,896 
Nickel recovery yield5
%92.29 %98.79 %
Average exchange rate for the six months ended 31 December 2022 and 30 June 2022 was R17.33/US$ and R15.40/US$, respectively
Figures may not add as they are rounded independently

1Amounts included since effective date of the acquisition on 4 February 2022
2Nickel salts consist of anhydrous nickel, nickel chloride low sodium, nickel chloride standard, nickel carbonate and nickel chloride solution
3Nickel cakes occur during the processing of nickel matte and are recycled back into the nickel refining process
4Cobalt chloride and ferric chloride are obtained from nickel matte through a different refining process on an order basis
5Nickel recovery yield is the percentage of total nickel recovered from the matte relative to the nickel contained in the matte received
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 24


CONDENSED CONSOLIDATED PROVISIONAL FINANCIAL STATEMENTS
Condensed consolidated income statement
Figures are in millions unless otherwise stated
US dollarSA rand
Year endedSix months endedSix months endedYear ended
UnauditedUnauditedUnauditedUnauditedUnauditedUnauditedUnauditedUnauditedUnauditedUnaudited
Dec 2021Dec 2022Dec 2021Jun 2022Dec 2022NotesDec 2022Jun 2022Dec 2021Dec 2022Dec 2021
11,6438,4485,4614,5703,878Revenue267,90970,37982,241138,288172,194
(7,391)(6,208)(3,821)(3,263)(2,945)Cost of sales(51,375)(50,249)(57,355)(101,624)(109,306)
(6,830)(5,775)(3,521)(3,054)(2,721)Cost of sales, before amortisation and depreciation(47,512)(47,025)(52,860)(94,537)(101,013)
(561)(433)(300)(209)(224)Amortisation and depreciation(3,863)(3,224)(4,495)(7,087)(8,293)
4,2522,2401,6401,30793316,53420,13024,88636,66462,888
8173383835Interest income6145895781,2031,202
(169)(173)(82)(95)(78)Finance expense3(1,378)(1,462)(1,235)(2,840)(2,496)
(26)(13)(6)(7)(6)Share-based payment expenses(106)(112)(85)(218)(383)
(425)(261)(367)(26)(235)Loss on financial instruments4(3,880)(399)(5,437)(4,279)(6,279)
7838104929Gain on foreign exchange differences4761401,5276161,149
13479385029Share of results of equity-accounted investees after tax5177705851,2871,989
(205)(225)(105)(92)(133)Other costs1.2(2,249)(1,430)(1,543)(3,679)(3,018)
5268324820Other income1.23837274661,110764
210264Gain on disposal of property, plant and equipment68943016236
(348)—(348)——Reversal of impairments/(impairments)56—(5,148)6(5,148)
(13)—(13)——Early redemption premium on the 2025 Notes——(196)—(196)
113(1)211Occupational healthcare gain/(expense)18625(10)21114
(7)(22)(4)(2)(20)Restructuring costs(327)(36)(69)(363)(107)
(9)(9)(6)(7)(2)Transaction costs(44)(108)(102)(152)(140)
3,3981,8189221,231587Profit before royalties, carbon tax and tax10,80018,92814,24729,72850,275
(184)(112)(71)(63)(49)Royalties(864)(970)(1,072)(1,834)(2,714)
—1—1—Carbon tax(1)11(1)10(4)
3,2141,7078511,169538Profit before tax9,93517,96913,17427,90447,557
(930)(545)(307)(366)(179)Mining and income tax6(3,296)(5,628)(4,697)(8,924)(13,761)
(913)(567)(375)(321)(246)- Current tax(4,345)(4,937)(5,675)(9,282)(13,506)
(17)2268(45)67- Deferred tax1,049(691)978358(255)
2,2841,162544803359Profit for the period 6,63912,3418,47718,98033,796
Profit for the period attributable to:
2,2341,126527782344- Owners of Sibanye-Stillwater6,38012,0168,21818,39633,054
5036172115- Non-controlling interests (NCI)259325259584742
Earnings per ordinary share (cents)
7740192813Basic earnings per share 7.12254262886511,140
7640192813Diluted earnings per share7.22254242866501,129
2,898,8042,826,0852,853,4952,821,9052,830,197Weighted average number of shares ('000) 7.12,830,1972,821,9052,853,4952,826,0852,898,804
2,927,2462,830,7812,876,8942,830,9082,830,781Diluted weighted average number of shares ('000)7.22,830,7812,830,9082,876,8942,830,7812,927,246
14.7916.3715.0315.4017.33Average R/US$ rate




The condensed consolidated provisional financial statements for the year and six months ended 31 December 2022 have been prepared by Sibanye-Stillwater's Group financial reporting team headed by Jacques le Roux (CA (SA)). This process was supervised by the Group's Chief Financial Officer, Charl Keyter and approved by the Sibanye-Stillwater board of directors.
A convenience translation has been applied to the primary statements into US dollar based on the average exchange rate for the period for the condensed consolidated income statement, statements of other comprehensive income and cash flows, and the period-end closing exchange rate for the condensed consolidated statement of financial position and exchange rate differences on translation are accounted for in the condensed consolidated statement of other comprehensive income. This information is provided as supplementary information only and has not been reviewed or reported on by the Company's external auditor.
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 25


Condensed consolidated statement of other comprehensive income

Figures are in millions unless otherwise stated
US dollarSA rand
Year endedSix months endedSix months endedYear ended
UnauditedUnauditedUnauditedUnauditedUnauditedUnauditedUnauditedUnauditedUnauditedUnaudited
Dec 2021Dec 2022Dec 2021Jun 2022Dec 2022Dec 2022Jun 2022Dec 2021Dec 2022Dec 2021
2,2841,162544803359Profit for the period6,63912,3418,47718,98033,796
(115)(207)(209)(148)(59)Other comprehensive income, net of tax2,551(182)5,5612,3694,635
—————
Foreign currency translation adjustments1
2,6731,1674,8463,8403,807
56(90)48(88)(2)
Fair value adjustment on other investments2
(118)(1,349)715(1,467)828
—————
Re-measurement of defined benefit plan2
(4)——(4)—
(171)(117)(257)(60)(57)
Currency translation adjustments3
—————
2,169955335655300Total comprehensive income9,19012,15914,03821,34938,431
Total comprehensive income attributable to:
2,119914318633281- Owners of Sibanye-Stillwater8,85011,82113,79020,67137,698
5041172219- Non-controlling interests340338248678733
14.7916.3715.0315.4017.33Average R/US$ rate
1 These gains and losses will be reclassified to profit or loss upon disposal of the underlying operations
2 These gains and losses will never be reclassified to profit or loss
3 These gains and losses relate to the convenience translation of the SA rand amounts to US dollar and will never be reclassified to profit or loss
Condensed consolidated statement of financial position

Figures are in millions unless otherwise stated
US dollarSA rand
UnauditedUnauditedUnauditedUnauditedUnauditedUnaudited
Dec 2021Jun 2022Dec 2022NotesDec 2022Jun 2022Dec 2021
5,5315,8576,216Non-current assets105,86795,40788,163
3,9214,2464,516Property, plant and equipment76,90969,16662,494
141916Right-of-use assets279306222
485490489Goodwill and other intangibles8,3227,9877,727
476481497Equity-accounted investments8,4717,8307,594
211171196Other investments93,3402,7883,367
326320312Environmental rehabilitation obligation funds5,3065,2195,202
416147Other receivables798994651
5769143Deferred tax assets2,4421,117906
4,0673,8793,567Current assets60,76463,18264,831
1,5731,6581,549Inventories26,38427,00525,080
465437440Trade and other receivables7,5007,1247,411
33145Other receivables81221523
789742Tax receivable7231,5841,245
1,9001,6731,531Cash and cash equivalents26,07627,24830,292
18——Asset held for sale——280
9,5989,7369,783Total assets166,631158,589152,994
5,1025,4875,342Total equity91,00489,35881,345
3,2063,0973,254Non-current liabilities55,40850,43651,108
1,2671,2751,327Borrowings1122,60620,77220,191
111512Lease liabilities208240177
518531502Environmental rehabilitation obligation and other provisions8,5528,6558,263
645346Occupational healthcare obligation7818681,017
177174293Cash-settled share-based payment obligations124,9912,8332,829
289125147Other payables132,5002,0294,599
389379376Deferred revenue6,3996,1756,204
111Tax and royalties payable111010
490544550Deferred tax liabilities9,3608,8547,818
1,2901,1521,187Current Liabilities20,21918,79520,541
777Borrowings11122115107
777Lease liabilities111119104
—93Occupational healthcare obligation44140—
41517Cash-settled share-based payment obligations1228425258
951883919Trade and other payables15,65314,39215,162
299175228Other payables133,8912,8564,765
1061Deferred revenue21102156
12505Tax and royalties payable93819189
9,5989,7369,783Total equity and liabilities166,631158,589152,994
15.9416.2917.03Closing R/US$ rate



Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 26




Condensed consolidated statement of changes in equity

Figures are in millions unless otherwise stated
US dollar1
SA rand1
Stated capitalRe- organisation reserveOther reservesAccum-
ulated
profit/(loss)
Non-
controlling interests
Total
equity
NotesTotal
equity
Non-
controlling interests
Accum-
ulated
profit
Other reservesRe- organisation reserveStated capital
1,9362,599517(391)1534,814Balance at 31 December 2020 (Previously reported)70,7162,23612,7602,56923,00130,150
———(33)33—Correction of transaction with DRDGOLD shareholders1.3—544(544)———
1,9362,599517(424)1864,814Balance at 31 December 2020 (Restated)70,7162,78012,2162,56923,00130,150
——(115)2,234502,169Total comprehensive income for the period38,43173333,0544,644——
———2,234502,284Profit for the period33,79674233,054———
——(115)——(115)Other comprehensive income, net of tax4,635(9)—4,644——
———(1,206)(23)(1,229)Dividends paid(18,176)(344)(17,832)———
——10—111Equity-settled share-based payments1519—142——
(575)————(575)Share buy-back(8,503)————(8,503)
———2(81)(79)Marikana B-BBEE transaction(1,146)(1,180)34———
———(6)(3)(9)Transaction with Platinum Mile shareholders(128)(46)(82)———
——(2)2——Adjustment due to sale of St Helena Hospital Proprietary Limited (St Helena Hospital)——24(24)——
1,3612,5994106021305,102Balance at 31 December 2021 (Restated)81,3451,95227,4147,33123,00121,647
——(212)1,12641955Total comprehensive income for the period21,34967818,3922,279——
———1,126361,162Profit for the period18,98058418,396———
——(212)—5(207)Other comprehensive income, net of tax2,36994(4)2,279——
———(562)(16)(578)Dividends paid(9,453)(256)(9,197)———
——1—12Equity-settled share-based payments2410—14——
————7474Keliber Oy (Keliber) asset acquisition10.11,2191,219————
——4(173)(42)(211)
Transaction with shareholders2
(3,452)(686)(2,828)62——
————(1)(1)
Sale of Lonmin Canada Incorporated (Lonmin Canada)3
(14)(14)————
——(1)——(1)Foreign exchange movement recycled through profit or loss(14)——(14)——
1,3612,5992029931875,342Balance at 31 December 2022 91,0042,90333,7819,67223,00121,647
1 This information is unaudited
2 This relates to transactions entered into by Sibanye-Stillwater with the shareholders of Keliber (refer note 10.1)
3 The Group entered into an arrangement to dispose of its interest in Lonmin Canada to Magna Mining Incorporated for an aggregate purchase consideration of CAD10 million (Canadian dollars)of which CAD2 million is deferred over twelve months. The transaction concluded during Q4 2022 and resulted in a profit of R145 million recognised in profit or loss. Lonmin Canada held the Denison PGM exploration project in Canada and was acquired as part of the Lonmin plc (subsequently renamed to Sibanye UK Limited) acquisition on 7 June 2019
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 27




Condensed consolidated statement of cash flows

Figures are in millions unless otherwise stated
US dollarSA rand
Year endedSix months endedSix months endedYear ended
UnauditedUnauditedUnauditedUnauditedUnauditedUnauditedUnauditedUnauditedUnauditedUnaudited
Dec 2021Dec 2022Dec 2021Jun 2022Dec 2022NoteDec 2022Jun 2022Dec 2021Dec 2022Dec 2021
Cash flows from operating activities
4,5832,4891,8521,4361,053Cash generated by operations18,63922,10728,05540,74667,784
4132(1)Deferred revenue advance received—24512465
—————Post-retirement health care payments—(1)(1)(1)(1)
(16)(17)(7)(13)(4)Cash-settled share-based payments paid(74)(198)(113)(272)(240)
(11)(14)—(15)1Payment of Marikana dividend obligation—(225)—(225)(162)
(119)(278)2(295)17
Additional deferred payments relating to acquisition of a business1
—(4,545)—(4,545)(1,754)
16624473(107)131Change in working capital2,034(1,648)6,9243862,455
4,6072,2052,3231,0081,19720,59915,51434,91636,11368,147
6542303012Interest received221461448682960
(53)(68)(20)(38)(30)Interest paid(534)(584)(303)(1,118)(781)
(207)(111)(82)(64)(47)Royalties paid(836)(979)(1,237)(1,815)(3,055)
(1,003)(542)(419)(302)(240)Tax paid(4,221)(4,645)(6,348)(8,866)(14,839)
(1,229)(577)(565)(349)(228)Dividends paid(4,075)(5,378)(8,516)(9,453)(18,176)
2,1809491,267285664Net cash from operating activities11,1544,38918,96015,54332,256
Cash flow from investing activities
(861)(971)(477)(399)(572)Additions to property, plant and equipment(9,755)(6,144)(7,154)(15,899)(12,740)
512384Proceeds on disposal of property, plant and equipment751164619180
—(69)—(74)5Acquisition of subsidiaries, net of cash acquired10—(1,132)—(1,132)—
6934242410Dividends received2013633715641,020
(122)(47)(120)(29)(18)Additions to other investments(322)(450)(1,781)(772)(1,803)
(30)(6)(11)(6)—Acquisition of equity-accounted investment—(92)(168)(92)(446)
(5)(5)(4)(1)(4)Contributions to environmental rehabilitation funds(63)(23)(61)(86)(72)
(39)(11)—(12)1
Payment of deferred/contingent payment1
—(185)(15)(185)(577)
(4)(1)—(1)—Contributions to enterprise development fund—(10)(14)(10)(65)
—(4)——(4)Cash outflow on loss of control of subsidiary(58)——(58)—
—4——4Proceeds on sale of Lonmin Canada72——72—
2—2——Proceeds on sale of St Helena Hospital——25—25
1212—Proceeds from environmental rehabilitation funds—3353310
(984)(1,062)(582)(488)(574)Net cash used in investing activities(9,850)(7,524)(8,746)(17,374)(14,568)
Cash flow from financing activities
1,3964891,245357132Loans raised112,5005,50018,4558,00020,651
(1,369)(489)(1,166)(357)(132)Loans repaid11(2,502)(5,501)(17,305)(8,003)(20,252)
(8)(8)(4)(5)(3)Lease payments(59)(72)(56)(131)(112)
(9)(205)(9)—(205)Acquisition of non-controlling interests10.1(3,363)—(128)(3,363)(128)
(575)—(524)——Share buy-back——(7,761)—(8,503)
(565)(213)(458)(5)(208)Net cash used in financing activities(3,424)(73)(6,795)(3,497)(8,344)
631(326)227(208)(118)Net (decrease)/increase in cash and cash equivalents(2,120)(3,208)3,419(5,328)9,344
(109)(43)(156)(19)(24)Effect of exchange rate fluctuations on cash held9481647761,112708
1,3781,9001,8291,9001,673Cash and cash equivalents at beginning of the period27,24830,29226,09730,29220,240
1,9001,5311,9001,6731,531Cash and cash equivalents at end of the period26,07627,24830,29226,07630,292
14.7916.3715.0315.4017.33Average R/US$ rate
15.9417.0315.9416.2917.03Closing R/US$ rate

1    Included in the payments made is R4,441 million, R179 million and R110 million relating to the Rustenburg operation acquisition (Rustenburg deferred payment), Pandora acquisition and SFA (Oxford) acquisition, respectively. Payments made up to the original fair value of the liability are classified as investing cash flows, with any amount paid above the original fair value of the liability classified as operating cash flows

Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 28


Notes to the condensed consolidated provisional financial statements
1. Basis of accounting and preparation
The condensed consolidated provisional financial statements are prepared in accordance with the requirements of the JSE Listings Requirements for provisional reports and the requirements of the Companies Act of South Africa. The JSE Listings Requirements require provisional reports to be prepared in accordance with framework concepts, and the measurement and recognition requirements of International Financial Reporting Standards (IFRS), and the South African Institute of Chartered Accountants Financial Reporting Guides as issued by the Accounting Practices Committee and Financial Pronouncements as issued by the Financial Reporting Standards Council and to also, as a minimum, contain information required by IAS 34 Interim Financial Reporting. The accounting policies applied in the preparation of these condensed consolidated provisional financial statements are in terms of IFRS and are consistent with those applied in the previous consolidated annual financial statements, included in the 31 December 2021 annual financial report.
The condensed consolidated income statement, and statements of other comprehensive income and cash flows for the six months ended
31 December 2021 were not reviewed by the Company’s external auditor and were prepared by subtracting the condensed consolidated financial statements for the six months ended 30 June 2021 from the comprehensive consolidated financial statements for the year ended 31 December 2021. The condensed consolidated income statement, and statements of other comprehensive income and cash flows for the six months ended 31 December 2022 have not been reviewed by the Company’s external auditor and were prepared by subtracting the condensed consolidated financial statements for the six months ended 30 June 2022 from the condensed consolidated provisional financial statements for the year ended 31 December 2022.
The translation of the primary statements into US dollar is based on the average exchange rate for the period for the condensed consolidated income statement, statements of other comprehensive income and cash flows, and the period-end closing exchange rate for the statement of financial position. Exchange differences on translation are accounted for in the statement of other comprehensive income. This information is provided as supplementary information only and has not been reviewed by the Company's external auditor.
1.1 Standards, interpretations and amendments to published standards effective on 1 January 2022 and those issued but not yet effective
The amendments to published standards effective on 1 January 2022 and adopted by the Sibanye Stillwater Limited (Sibanye-Stillwater) group (the Group) did not have a material effect on the Group’s condensed consolidated provisional financial statements for the year ended 31 December 2022. Standards, interpretations and amendments to published standards not yet effective on 1 January 2022 are not expected to have a material effect on the Group.
1.2 Condensed consolidated income statement re-presentation to align to the presentation included in the Group's Annual Financial Report
Management reclassified the presentation of "Net other costs" on the condensed consolidated income statement for the year and six months ended 31 December 2022, as well as re-presented all comparative information, to align to the presentation in the Group's annual financial statements for the year ended 31 December 2022. The impact of the re-presentation is the disaggregation of "Net other costs" to "Other costs" and "Other income". The presentation changes have no impact on the Group's profit for the current and previous periods presented. The below table details the presentation changes made to previously disclosed line items.
Figures in million - SA randSix months endedYear ended
UnauditedUnauditedUnaudited
June 2022Dec 2021Dec 2021
Previously presented line items:
Net other costs(703)(1,077)(2,254)
Care and maintenance(358)(352)(737)
Change in estimate of environmental rehabilitation obligation, and right of recovery receivable and payable—162167
Strike related costs(223)——
Service entity (costs)/income55(85)(59)
Non-recurring COVID-19 costs—(2)(3)
Other(177)(800)(1,622)
Disaggregated line items presented:
Other costs(1,430)(1,543)(3,018)
Other income727466764
1.3 Restatement of accumulated profit and non-controlling interest (NCI)
On 10 January 2020, Sibanye-Stillwater announced that it had exercised its option to subscribe for additional ordinary shares of DRDGOLD to attain a 50.1% shareholding in DRDGOLD. The exercise of this option increased Sibanye-Stillwater’s holding in DRDGOLD from 265,000,000 shares to 433,158,944 shares. The exercise price amounted to R1,086 million for the subscription. This transaction was recognised in the Sibanye-Stillwater’s group financial statements for the year ended 31 December 2020.
The subsequent increase in the DRDGOLD shareholding was accounted for as a transaction with shareholders and accounted for in equity. The purchase of the additional shares by the Group was recognised as a dilution of the NCI amounting to R220 million. In determining the attributable NCI adjustment, management identified that they incorrectly classified the consideration paid for the share subscription to the owners of the parent and therefore excluded this consideration paid from the net asset value of DRDGOLD used in determining the NCI. Since the NCI ultimately shares in the proportionate interest of the net assets of DRDGOLD, the NCI’s should also share in the cash arising from the share subscription.
The impact of this error resulted in a classification difference between NCI and equity attributable to the owners of Sibanye-Stillwater of R544 million. Therefore, the transaction with DRDGOLD shareholders disclosed in the financial statements for the year ended 31 December 2020 should have been an increase in NCI of R324 million rather than a decrease of R220 million. Accordingly, as at 31 December 2020 and 31 December 2021, management restated the accumulated profit and NCI by R544 million, respectively.
This error has no impact on any condensed consolidated income statements, condensed consolidated statements of other comprehensive income and cash flows. Although this error has no impact on the condensed consolidated statements of financial position at 31 December 2021 and 30 June 2022, as presented in these condensed consolidated provisional financial statements, it has a restatement impact on the 31 December 2020 and 31 December 2021 comprehensive statements of financial position included in the Group annual financial report.

Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 29


2. Revenue
The Group’s sources of revenue are:
Figures in million - SA rand
Six months endedYear ended
UnauditedUnauditedUnauditedUnauditedUnaudited
Dec 2022June 2022Dec 2021Dec 2022Dec 2021
Gold mining activities11,8615,98115,05117,84228,358
PGM mining activities1
39,01745,34246,19484,359102,099
Battery Metals activities9672,173—3,140—
Recycling activities15,94916,31821,29632,26740,710
Stream1
97241366338625
Toll treatment arrangement2
—105345105521
Total revenue from contracts with customers67,89170,16083,252138,051172,313
Adjustments relating to sales of PGM concentrate3
18219(1,011)237(119)
Total revenue67,90970,37982,241138,288172,194
1    The difference between revenue from PGM mining activities above and total revenue from PGM mining activities per the segment report relates to the separate disclosure of revenue from the gold and palladium streaming arrangement with Wheaton Precious Metals International (Wheaton International)(Wheaton Stream) in the above as well as the separate disclosure of revenue related to adjustments on the sales of PGM concentrate and the toll treatment arrangement entered into by Marikana (refer footnote 2 below). Revenue relating to the Wheaton Stream is incorporated in the Group corporate segment as described in the segment report (refer note 17)
2    This relates to revenue recognised in respect of a toll treatment arrangement entered into by Marikana during 2021. This arrangement concluded on 31 December 2021 and toll treatment revenue recognised for the year ended 31 December 2022 represents revenue earned for the processing of material received before 31 December 2021
3    These adjustments relate to provisional pricing arrangements resulting in subsequent changes to the amount of revenue recognised
Revenue per geographical region of the relevant operations:
Figures in million - SA rand
Six months endedYear ended
UnauditedUnauditedUnauditedUnauditedUnaudited
Dec 2022June 2022Dec 2021Dec 2022Dec 2021
Southern Africa45,26744,24052,46389,507113,512
United States21,67523,96629,77845,64158,682
Europe9672,173—3,140—
Total revenue67,90970,37982,241138,288172,194
Percentage of revenue per segment based on the geographical location of customers purchasing from the Group:
Six months endedYear ended
UnauditedUnauditedUnauditedUnauditedUnaudited
Dec 2022June 2022Dec 2021Dec 2022Dec 2021
Gold


chart-5d96fee877f249ba804.jpg
chart-bf61d82d9b50431ab47a.jpg
chart-d4edf2ee18ed4334aaaa.jpg
chart-cfdb204cb0214b23b46a.jpg
chart-5d96fee877f249ba804.jpg
Dec 2022June 2022Dec 2021Dec 2022Dec 2021
PGM


chart-29baf501b8dc4a2d9c3a.jpg
chart-36048c9e0da14bf38c9a.jpg
chart-c48b3b270f4d47bfa72a.jpg
chart-0193ec5874134666898a.jpg
chart-7ab02a363506464ba9da.jpg
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 30


Six months endedYear ended
UnauditedUnauditedUnauditedUnauditedUnaudited
Dec 2022June 2022Dec 2021Dec 2022Dec 2021
Battery metals

chart-6af8884551dc43d7bcea.jpg
chart-8f2c8d61acaf4d73a5ba.jpg


chart-8dd5f010bf2b49e6921a.jpg


Revenue generated per product:
Figures in million - SA rand
Six months endedYear ended
UnauditedUnauditedUnauditedUnauditedUnaudited
Dec 2022June 2022Dec 2021Dec 2022Dec 2021
Gold12,2876,52515,67118,81229,533
PGMs52,27858,79263,922111,070137,958
Platinum8,8179,00910,05917,82621,238
Palladium19,54022,73525,21642,27552,859
Rhodium22,12425,04226,68547,16659,828
Iridium1,1521,3281,2332,4802,694
Ruthenium6456787291,3231,339
Chrome1,6751,8061,2273,4812,259
Nickel1
1,5402,7658114,3051,420
Other2
1294916106201,024
Total revenue 67,90970,37982,241138,288172,194
1 For the year ended 31 December 2022, Nickel includes R870 million Nickel salts (R419 million and R451 million for the six months ended 31 December 2022 and six months ended 30 June 2022, respectively) and R2,020 million Nickel metal (R424 million and R1,596 million for the six months ended 31 December 2022 and six months ended 30 June 2022, respectively) sold from the Battery metals operations. The remaining Nickel is sold from the Group's SA PGM and US PGM operations
2 Other primarily includes revenue from silver, cobalt and copper sales. For the year and six months ended 31 December 2022, revenue from the Marikana toll treatment arrangement of R105 million and Rnil, respectively is included (R105 million and R345 million for the six months ended 30 June 2022 and six months ended 31 December 2021, respectively, and R521 million for the year ended 31 December 2021)
3. Finance expense
Figures in million - SA randSix months endedYear ended
UnauditedUnauditedUnauditedUnauditedUnaudited
NotesDec 2022June 2022Dec 2021Dec 2022Dec 2021
Interest charge on:
Borrowings — interest11(515)(531)(337)(1,046)(801)
- US$600 million revolving credit facility (RCF)(34)(28)(15)(62)(113)
- R5.5 billion RCF (40)(115)(36)(155)(66)
- 2022 and 2025 Notes——(187)—(523)
- 2026 and 2029 Notes(441)(388)(99)(829)(99)
Borrowings — unwinding of amortised cost11(116)(100)(184)(216)(302)
- 2022 and 2025 Notes——(112)—(169)
- 2026 and 2029 Notes(36)(32)(8)(68)(8)
- Burnstone Debt(80)(68)(64)(148)(125)
Lease liabilities(14)(17)(14)(31)(29)
Environmental rehabilitation obligation(309)(302)(310)(611)(615)
Occupational healthcare obligation(45)(40)(39)(85)(77)
Rustenburg deferred payment 13.1(92)(174)(63)(266)(158)
Marikana dividend obligation(76)(89)(58)(165)(87)
Deferred revenue
(172)(154)(151)(326)(309)
Other(39)(55)(79)(94)(118)
Total finance expense(1,378)(1,462)(1,235)(2,840)(2,496)
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 31


4. Loss on financial instruments
Figures in million - SA rand
Six months endedYear ended
UnauditedUnauditedUnauditedUnauditedUnaudited
NotesDec 2022June 2022Dec 2021Dec 2022Dec 2021
Fair value (loss)/gain on palladium hedge contract1
(150)(91)550(241)234
Fair value loss on share-based payment obligations2
(1,860)(295)(713)(2,155)(1,264)
Loss on the revised cash flow of the Rustenburg deferred payment 13.1(773)—(4,658)(773)(4,653)
Loss on the revised cash flow of the Burnstone Debt11(776)—(2)(776)(2)
Loss on the revised cash flow of the Marikana dividend obligation(625)(25)(468)(650)(468)
Fair value gain on other investments12923—152—
Other175(11)(146)164(126)
Total loss on financial instruments(3,880)(399)(5,437)(4,279)(6,279)
1 On 17 January 2020, Stillwater Mining Company (wholly owned subsidiary of Sibanye-Stillwater) concluded a palladium hedge agreement which commenced on 28 February 2020, comprising the delivery of 240,000 ounces of palladium over two years (10,000 ounces per month) with a zero cost collar which establishes a minimum and a maximum cap of US$1,500 and US$3,400 per ounce, respectively. The hedge agreement concluded on 31 January 2022. On 24 March 2021, Stillwater Mining Company concluded an additional palladium hedge agreement commencing on 28 February 2022, comprising the delivery of 140,000 ounces of palladium over a fourteen month period (10,000 ounces per month) with a zero cost collar which establishes a minimum floor and a maximum cap of US$1,800 and US$3,300 per ounce, respectively. As hedge accounting is not applied, resulting gains or losses are accounted for as gains or losses on financial instruments in profit or loss
2 The fair value loss relates to the cash-settled share-based payment obligations in respect of the Rustenburg operation B-BBEE transaction and the Marikana B-BBEE transaction (refer note 12)
5. Reversal of impairments/(impairments)
The Group performed its annual impairment testing for goodwill and cash-generating units (CGUs) where impairment indicators were present at
31 December 2022. The below table is a breakdown of the reversal of impairment/(impairments) recognised for each period ended.
Figures in million - SA rand
Six months endedYear ended
UnauditedUnauditedUnauditedUnauditedUnaudited
Dec 2022June 2022Dec 2021Dec 2022Dec 2021
Impairment of mining assets(1)—(5,148)(1)(5,148)
Other reversal of impairment7——7—
Total reversal of impairments/(impairments)6—(5,148)6(5,148)
Group impairment assumptions
The annual life-of-mine plan, used in the annual impairment assessment, takes into account the following:
•Proved and probable ore reserves of the CGUs
•Cash flows based on the life-of-mine plan
•Sustaining capital expenditure estimates over the life-of-mine plan
The Group's estimates and assumptions used in the 31 December 2022 calculations include:
Gold operationsPGM operationsBattery Metals
UnauditedUnauditedUnauditedUnauditedUnaudited
Dec 2022Dec 2021Dec 2022Dec 2021Dec 2022
Average gold price1
R/kg869,035773,398
Average PGM (4E) basket price1
R/4Eoz27,56624,422
Average PGM (2E) basket price1
US$/2Eoz1,3341,180
Average nickel price1
US$/lbs8.3
Average cobalt price1
US$/lbs22.1
Nominal discount rate — South Africa2, 3
%13.9 - 15.811.5 - 13.522.5 - 22.620.0
Nominal discount rate — United States3
%12.98.3
Nominal discount rate — Europe3
%9.8
Inflation rate — South Africa4
%6.56.06.56.0
Inflation rate — United States4
%4.02.0
Inflation rate — Europe4
%2.5
Life-of-mine5
years4 - 104 - 915 - 4917 - 5024
1 The average prices and the exchange rate were derived by considering various bank and commodity broker consensus forecasts. The average gold price used in the impairment assessment of the Burnstone project was R793,473/kg (2021: R729,270/kg) and on the Mimosa equity-accounted joint venture was R25,420/4Eoz (2021: R21,943/4Eoz)
2 Nominal discount rate for the Burnstone project is 17.4% (2021: 15.3%) and for the equity-accounted joint venture Mimosa, 30.7% (2021: 24.4%)
3 The nominal discount rate is calculated as the weighted average cost of capital of the respective CGUs
4 The inflation rate is based on historical mining inflation, projected electricity and labour cost increases and the forecast inflation rate of each region
5 Periods longer than five years are considered appropriate based on the nature of the operations since a formally approved life-of-mine plan is used to determine cash flows over the life of each mine based on the available reserves
Results of impairment assessments for the Group's gold operations, PGM operations, battery metals operations and goodwill allocated to CGUs
No impairment was identified for the Group's gold, PGM and battery metals CGUs or any CGUs with allocated goodwill. Sufficient headroom exists for all CGUs with allocated goodwill. Management believes that currently there are no reasonably possible changes in the assumptions used to assess impairment, which would lead to an impairment for any CGUs with allocated goodwill.
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 32


6. Mining and income tax
Figures in million - SA rand
Six months endedYear ended
UnauditedUnauditedUnauditedUnauditedUnaudited
Dec 2022June 2022Dec 2021Dec 2022Dec 2021
Tax on profit before tax at maximum South African statutory company tax rate (28%)1
(2,782)(5,031)(3,689)(7,813)(13,316)
South African gold mining tax formula rate adjustment77(58)161963
US statutory tax rate adjustment32149(44)181466
Deferred tax rate differentials16——16—
Non-deductible amortisation and depreciation43(45)(6)(2)(13)
Non-taxable dividend received4—747
Non-deductible finance expense
(104)(92)(46)(196)(108)
Non-deductible share-based payments(3)(4)(15)(7)(42)
Non-deductible loss on fair value of financial instruments(906)(70)(868)(976)(1,021)
Non-taxable gain on foreign exchange differences157482247
Non-taxable share of results of equity-accounted investees145215164360557
Non-taxable reversal of impairments/(non-deductible impairments)1—(22)1(22)
Non-deductible transaction costs(76)—(39)(76)(69)
Tax adjustment in respect of prior periods—(35)439(35)386
Net other non-taxable income and non-deductible expenditure14016286156351
Change in estimated deferred tax rate(270)3231415386
Unrecognised deferred tax assets recognised or utilised/(deferred tax assets unrecognised or derecognised)2
372(1,003)(1,069)(631)(1,133)
Mining and income tax(3,296)(5,628)(4,697)(8,924)(13,761)
Effective tax rate33 %31 %36 %32 %29 %
1 The corporate income tax rate applicable to Sibanye-Stillwater and its South African subsidiaries will change to 27% from 1 January 2023
2 The amount for the year ended 31 December 2022 mainly includes deferred tax assets not recognised at Sibanye Gold Proprietary Limited (SGL) and the Cooke operations of R962 million during the six months ended 30 June 2022 and R255 million for the six months ended 31 December 2022 related to the Burnstone project, which is offset by previously derecognised deferred tax assets recognised at SGL of R644 million during the six months ended 31 December 2022. The amounts for the six months and year ended 31 December 2021 include the derecognition of deferred tax assets of R837 million relating to deductible temporary differences, that can no longer be recognised due to the impairment of the mining assets in the SA gold operations
7. Earnings per share
7.1 Basic earnings per share
Six months endedYear ended
UnauditedUnauditedUnauditedUnauditedUnaudited
Dec 2022June 2022Dec 2021Dec 2022Dec 2021
Ordinary shares in issue (’000)2,830,3702,830,0192,808,4062,830,3702,808,406
Adjustment for weighting of ordinary shares in issue (’000)(173)(8,114)45,089(4,285)90,398
Adjusted weighted average number of shares (’000)2,830,1972,821,9052,853,4952,826,0852,898,804
Profit attributable to owners of Sibanye-Stillwater (SA rand million)6,38012,0168,21818,39633,054
Basic earnings per share (EPS) (cents)2254262886511,140
7.2 Diluted earnings per share
Potential ordinary shares arising from the equity-settled share-based payment scheme resulted in a dilution for the six month periods ended 30 June 2022 and 31 December 2021 as well as the 12 month periods ended 31 December 2022 and 31 December 2021.
Six months endedYear ended
UnauditedUnauditedUnauditedUnauditedUnaudited
Dec 2022June 2022Dec 2021Dec 2022Dec 2021
Weighted average number of shares
Adjusted weighted average number of shares (’000)2,830,1972,821,9052,853,4952,826,0852,898,804
Potential ordinary shares - equity-settled share plan (’000)5849,00323,3994,69628,442
Diluted weighted average number of shares (’000)2,830,7812,830,9082,876,8942,830,7812,927,246
Diluted earnings per share (DEPS) (cents)2254242866501,129
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 33


7.3 Headline earnings per share
Figures in million - SA rand unless otherwise stated
Six months endedYear ended
UnauditedUnauditedUnauditedUnauditedUnaudited
Dec 2022June 2022Dec 2021Dec 2022Dec 2021
Profit attributable to owners of Sibanye-Stillwater6,38012,0168,21818,39633,054
Gain on disposal of property, plant and equipment(68)(94)(30)(162)(36)
(Reversal of impairments)/impairments(6)—5,148(6)5,148
Derecognition of property, plant and equipment in Marathon project————2
Loss/(gain) on deconsolidation of subsidiary309(1)—308—
Foreign exchange movement recycled through profit or loss(13)(1)—(14)—
Profit on sale of Lonmin Canada(145)——(145)—
Profit on sale of St Helena Hospital——(16)—(16)
Taxation effect of remeasurement items2313(1,275)36(1,274)
Re-measurement items, attributable to non-controlling interest 45—9—
Headline earnings6,48411,93812,04518,42236,878
Adjusted weighted average number of shares (’000)2,830,1972,821,9052,853,4952,826,0852,898,804
Headline EPS (cents)2294234226521,272
7.4 Diluted headline earnings per share
Figures in million - SA rand unless otherwise stated
Six months endedYear ended
UnauditedUnauditedUnauditedUnauditedUnaudited
Dec 2022June 2022Dec 2021Dec 2022Dec 2021
Headline earnings6,48411,93812,04518,42236,878
Diluted weighted average number of shares (’000)2,830,7812,830,9082,876,8942,830,7812,927,246
Diluted headline EPS (cents)2294224196511,260
8. Dividends
Dividend policy
The Group’s dividend policy is to return between 25% to 35% of normalised earnings to shareholders and after due consideration of future requirements the dividend may be increased beyond these levels. The Board, therefore, considers normalised earnings in determining what value will be distributed to shareholders. The Board believes normalised earnings provides useful information to investors regarding the extent to which results of operations may affect shareholder returns. Normalised earnings is defined as earnings attributable to the owners of Sibanye-Stillwater excluding gains and losses on financial instruments and foreign exchange differences, impairments, gain/loss on disposal of property, plant and equipment, occupational healthcare expenses, restructuring costs, transactions costs, share-based payment expenses on B-BBEE transactions, gains on acquisitions, net other business development costs, share of results of equity-accounted investees, all after tax and the impact of non-controlling interest, and changes in the estimated deferred tax rate.
In line with Sibanye-Stillwater’s Capital Allocation Framework, the Board of Directors resolved to declare a final dividend of 122 (2021: 187) SA cents per share. Together with the interim dividend of 138 (2021: 292) SA cents per share, which was declared and paid, this brings the total dividend for the year ended 31 December 2022 to 260 (2021: 479) SA cents per share and this amounts to a payout of 35% (2021: 35%) of normalised earnings.

Figures in million - SA rand
Six months endedYear ended
UnauditedUnauditedUnauditedUnauditedUnaudited
Dec 2022June 2022Dec 2021Dec 2022Dec 2021
Profit attributable to the owners of Sibanye-Stillwater6,38012,0168,21818,39633,054
Adjusted for:
Loss on financial instruments3,8803995,4374,2796,279
Gain on foreign exchange differences(476)(140)(1,527)(616)(1,149)
Gain on disposal of property, plant and equipment(68)(94)(30)(162)(36)
(Reversal of impairments)/impairments(6)—5,148(6)5,148
Restructuring costs3273669363107
Transaction costs44108102152140
Occupational healthcare (gain)/expense(186)(25)10(211)(14)
Loss due to dilution of interest in joint operation——2—4
Early redemption premium on the 2025 Notes——196—196
Loss/(gain) on deconsolidation of subsidiary309(1)—308—
Profit on sale of Lonmin Canada(145)——(145)—
Profit on sale of St Helena Hospital——(16)—(16)
Change in estimated deferred tax rate270(323)(141)(53)(86)
Share of results of equity-accounted investees after tax(517)(770)(585)(1,287)(1,989)
Tax effect of the items adjusted above20(53)(2,413)(33)(2,755)
Non-controlling interest effect of the items listed above729236—
Normalised earnings1
9,83911,18214,47221,02138,883
1 Non-IFRS measures such as normalised earnings as defined and reconciled above, are the responsibility of the Group's Board of Directors and are presented for illustration purposes only, and because of its nature, normalised earnings should not be considered as a representation of financial performance under IFRS

Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 34


9. Other investments
The movement in the other investments balance for the period includes the below. The remainder of the movement is primarily due to fair value adjustments at period end.
Investment in Verkor S.A. (Verkor)
During February 2022, the Group entered into a term sheet whereby the Group, through its wholly-owned subsidiary, Sibanye Battery Metals Proprietary Limited, invested in Verkor by subscribing for a €25 million convertible bond. Verkor is a French Gigafactory project aiming to enter the European battery materials market as a manufacturer of low-carbon footprint batteries for application in electric vehicles and large-scale stationary storage markets. The Group subscribed for the convertible bond on 22 March 2022 amounting to R409 million, and subject to early repayment events, will be redeemable in full on 30 June 2024. The convertible bond is recognised as an investment and measured at fair value, with net gains and losses recognised in profit or loss. The fair value of the investment at 31 December 2022 amounted to R554 million (30 June 2022: R432 million) with R145 million recognised as a fair value gain for the year ended 31 December 2022 (R122 million and R23 million gain recognised for the six months ended 31 December 2022 and 30 June 2022, respectively).
10. Acquisitions
10.1 Keliber asset acquisition
On 23 February 2021, Keliber Oy (Keliber) and the Group entered into an investment agreement that enables Keliber to significantly advance its lithium project in Central Ostrobothnia, Finland. The Keliber project consists of several advanced stage lithium spodumene deposits, with significant exploration upside potential in close proximity to the existing project. The project includes the development of a chemical plant in Kokkola, at 66 kilometres from the mining area, which will produce battery grade lithium hydroxide.
Under the investment agreement, the Group made an initial phased equity investment of €30 million for an approximate 30% equity shareholding into Keliber. In the first tranche the Group subscribed for shares in Keliber for €15 million and simultaneously, on the same terms as Sibanye-Stillwater’s €30 million phased investment, a further €10 million equity issuance was offered to the existing Keliber shareholders, which was fully subscribed. The investment agreement allows the Group to finance development work of a further €15 million in two tranches over a twelve-month period. The second tranche subscription payment was made on 16 September 2021.
The investment in Keliber resulting from the €15 million subscription in the first tranche and the €10 million in the second tranche was treated as an equity accounted associate from 17 March 2021, being the date on which the closing conditions on the first tranche subscription were met. The first and second tranche subscriptions resulted in an aggregate 26.6% shareholding as at 31 December 2021, which allowed for representation on the board of Keliber as well as significant involvement in the technical committee of the company. The transaction was entered into at fair value, and the difference between the net asset value and the fair value paid by the Group was attributed to the mineral reserve.
On 14 March 2022, the Group made payment for the third tranche of the initial phased equity investment in Keliber. The subscription price amounted to €5 million for an additional 125,000 shares in Keliber, resulting in an aggregate shareholding of approximately 30% at the time of subscription. Upon subscribing for the third tranche of the initial equity investment in Keliber during March 2022, the Group's pre-emptive right to obtain a majority shareholding (50% plus one share) and majority board representation in Keliber became exercisable.
Since the Group obtained substantive ability to acquire a majority shareholding in Keliber upon subscription for the third tranche share investment, management concluded that control was obtained at the time of subscription. At the date of acquisition, Keliber did not meet the definition of a business in terms of IFRS 3 Business Combinations (IFRS 3), and is therefore accounted for as an asset acquisition. Since the Group had already obtained control over Keliber with the third tranche subscription, subsequent share subscriptions are accounted for directly in equity as transactions with non-controlling shareholders on their respective effective dates.
Allocation of purchase consideration
Since the acquisition is outside the scope of IFRS 3, the purchase consideration was allocated to identifiable assets and liabilities based on their relative fair values. Assets and liabilities that are initially measured at an amount other than cost, such as financial instruments recognised at fair value, were recognised at their respective carrying amounts as specified in the applicable accounting standards. The functional currency of Keliber is Euro.

The below table summarises the value of the consideration paid and non-controlling interests recognised at the date of acquisition:
Figures in million - SA rand
Unaudited
Jun 2022
Consideration (30.3%)1
530
Gross value of allocated purchase consideration1,749
Non-controlling interest recognised (69.7%)1,219
1 The consideration is determined as the carrying value of the equity accounted investment at 14 March 2022 (i.e. the effective date) of R446 million and the cost of the €5 million third tranche payment made on the effective date amounting to R84 million. Net cash of R261 million was acquired at the effective date

Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 35


The following table summarises the allocation of the gross purchase consideration to identifiable assets and liabilities:
Figures in million - SA rand
Unaudited
Jun 2022
Property, plant and equipment1,481
Right-of-use assets31
Other receivables — non-current2
Trade and other receivables31
Cash and cash equivalents345
Borrowings(30)
Cash-settled share-based payment obligations(14)
Lease liabilities(32)
Other payables — non-current(2)
Trade and other payables(63)
Total purchase consideration allocated on relative fair value basis1,749
Subsequent shareholder transactions
On 30 June 2022, Sibanye-Stillwater announced its intention to exercise the pre-emptive right, and subsequently exercised this right on 29 July 2022 for a cash consideration of €146 million (Pre-emptive Offer). On 30 June 2022, the Group also made a voluntary cash offer to minority shareholders of Keliber, other than the Finnish Minerals Group, to increase its shareholding in Keliber to over 80% (Voluntary Offer) if taken up by all shareholders. The Voluntary Offer was subject to certain conditions and only considered to be accepted if the relevant shareholder completes a share transfer form. The Voluntary Offer was completed on 3 October 2022 at a total cost of €192 million (including transfer tax of €2 million). The table below illustrates the impact of the attribution of the NCI on accumulated profit of the Group as a result of the subsequent transactions with shareholders:
Figures in million - SA rand
Unaudited
Dec 2022
Pre-emptive Offer
Cash consideration paid to Keliber for share subscription1
(2,476)
Cash attributed to NCI2
1,238
Reattribution of equity3
349
Adjustment to accumulated profit (889)
Voluntary Offer
Cash consideration paid to NCI shareholders(3,363)
Reattribution of equity3
1,530
Adjustment to accumulated profit (1,833)
The net effect on equity attributable to the owners of Sibanye-Stillwater is summarised as follows:
Accumulated profit impact — Pre-emptive Offer(889)
Accumulated profit impact — Voluntary Offer(1,833)
Net effect due to foreign currency translation, share subscription costs and put options4
(106)
Total effect on accumulated profit as a result of the subsequent NCI transactions5
(2,828)
1 The cash consideration paid for the Pre-emptive Offer is consolidated in the Group. The full reattribution is recognised in equity and is a non-cash transaction for the Group
2 Since the NCI shares in a proportionate interest of the net assets of Keliber, the cash consideration paid for the Pre-emptive Offer is proportionally allocated to the NCI
3 This is the reattribution of the net asset value of Keliber as a result of the change in shareholding
4 The put options relate to rights held by shareholders holding approximately 1% in the share capital of Keliber to sell their shareholding to the Group at fair value less 10%
5 The Group's effective shareholding in Keliber following the Pre-emptive Offer, Voluntary Offer and impact of the put options was 85.90% at 31 December 2022
10.2 Sandouville business combination
On 30 July 2021, Sibanye-Stillwater announced that it had entered into an exclusive put option agreement (Put Option) with French mining group Eramet SA (Eramet) for the acquisition of 100% of the Sandouville nickel hydrometallurgical processing facility (Sandouville), located in Normandy, France. The Sandouville facility is situated in the industrial heart of Europe at Le Havre, France’s second largest industrial port, with strategic access to extensive logistical infrastructure including shipping, rail and key motorways, supporting any future supply into the European end user markets.
The transaction is the second step in the Group's battery metals strategy, building on the investment in the Keliber lithium hydroxide project, in partnership with the State of Finland and the Finnish Minerals Group, announced in February 2021. The Sandouville site is a polyvalent facility which is already zoned for heavy industrial purposes. The site is scaleable for nickel, cobalt and lithium battery grade products, and will enable the Group to further advance its battery metals strategy and recycling activities.
On 4 November 2021, following the signing of the exclusive Put Option, Sibanye-Stillwater announced that the Share Purchase Agreement (SPA) had been signed to acquire 100% of Sandouville. The signature of the SPA followed the successful completion of the information-consultation process with the employee representative bodies of Sandouville and Eramet, who rendered a favourable opinion of the transaction. The transaction also received the key regulatory approvals of the South African Reserve Bank and clearance from the French Foreign Investment Control Office. The remaining conditions in respect of the acquisition were fulfilled on 4 February 2022, the effective acquisition date.
Sandouville’s financial results were consolidated from the effective date. For the eleven months ended 31 December 2022, the Sandouville operations contributed revenue of R3,140 million and a net loss of R635 million to the Group’s results. Sandouville’s pro forma revenue and net loss would have been R3,324 million and R691 million, respectively, had the acquisition been effective from 1 January 2022. In determining these amounts, management has assumed that the fair value adjustments, determined provisionally, that arose on the date of acquisition would have been the same if the acquisition had occurred on 1 January 2022. The functional currency of Sandouville is Euro.
The purchase price allocation (PPA) was prepared on a provisional basis in accordance with IFRS 3 for, amongst others, property, plant and equipment, contingent liabilities, provisions, as well as any deferred tax implications at 30 June 2022. No new information was obtained by 31 December 2022, and the PPA is considered to be final.

Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 36


Consideration
The fair value of the consideration is as follows:
Figures in million - SA rand
Unaudited
Jun 2022
Cash1
1,501
Total consideration1,501
1 The cash consideration is made up of an initial payment on 4 February 2022 of EUR81 million (R1,390 million) and an additional payment of EUR6 million (R111 million) on 11 May 2022
Acquisition related costs
The Group incurred total acquisition related costs of R27 million for the year ended 31 December 2022 (R2 million for the six months ended 31 December 2022, R25 million for the six months ended 30 June 2022 and R28 million for the six months ended 31 December 2021) on advisory and legal fees. These costs are recognised as transaction costs in profit or loss during the period in which incurred.
Identified assets acquired and liabilities assumed
The following table summarises the recognised amounts of assets acquired and liabilities assumed at the acquisition date:
Figures in million - SA rand
Unaudited
Jun 2022
Property, Plant and equipment1,257
Right-of-use assets78
Intangible assets83
Other receivables — non-current11
Inventories601
Trade and other receivables104
Cash and cash equivalents1
108
Tax receivable3
Lease liabilities(88)
Environmental rehabilitation obligation and other provisions(97)
Other payables — non-current(164)
Borrowings(9)
Trade and other payables(409)
Fair value of identifiable net assets acquired2
1,478
1 The transaction results in net cash paid of R1,393 million as a result of cash and cash equivalents acquired of R108 million and cash consideration paid of R1,501 million
2 Fair value of assets and liabilities were determined as follows:
•The fair value of property, plant and equipment was based on an income approach consisting of a discounted cash flow model, as well as considering the depreciated replacement cost of the plant
•Lease liabilities and right-of-use assets approximate fair value, based on an assessment of the present value of the remaining lease payments at the effective date of the transaction using a market related discount rate
•Intangible assets includes software, patents, trademarks and customer relationships acquired from Eramet SA. The majority of the asset value is attributable to the customer relationships acquired and trademarks, which were valued based on the discounted future cash flows of commission contracts
•Inventories approximate fair value, based on the short inventory cycle and an assessment of net realisable value
•Trade and other receivables and trade and other payables approximate fair value due to their short-term nature
•The fair value of the decommissioning obligation is calculated on a discounted cash flow model considering the cost of decommissioning of the plant
•Borrowings approximate fair value based on an assessment of the discounted future cash flows at the effective date using a market related discount rate
Goodwill
Goodwill arising from the business combination has been recognised as follows:
Figures in million - SA rand
Unaudited
Jun 2022
Consideration1,501
Fair value of identifiable net assets acquired(1,478)
Goodwill1
23
1 The goodwill is attributable to the premium paid for the synergies and benefits expected to be derived from implementing the Group's battery metals strategy. None of the goodwill amount is deductible for tax purposes
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 37


11. Borrowings
Figures in million - SA rand
Six months endedYear ended
UnauditedUnauditedUnauditedUnauditedUnaudited
NotesDec 2022June 2022Dec 2021Dec 2022Dec 2021
Balance at beginning of the period20,88720,29817,18820,29818,383
Borrowings acquired on acquisition of subsidiaries10—39—39—
Loans raised2,5005,50018,4268,00020,622
US$600 million RCF1
————703
R5.5 billion RCF2
2,5005,500—8,000—
2026 and 2029 Notes3
——18,208—18,208
Other borrowings4
——218—1,711
Loans repaid(2,502)(5,501)(17,305)(8,003)(20,252)
US$600 million RCF1
——(6,244)—(7,728)
R5.5 billion RCF2
(2,500)(5,500)—(8,000)—
Other borrowings4
(2)(1)(221)(3)(1,684)
2022 and 2025 Notes——(10,840)—(10,840)
Early redemption premium on the 2025 Notes——196—196
Unwinding of loans recognised at amortised cost3116100184216302
Accrued interest 35155313371,046801
Accrued interest paid(516)(545)(255)(1,061)(706)
2022 and 2025 Notes——(204)—(527)
2026 and 2029 Notes(442)(402)—(844)—
R5.5 billion and US$600 million RCFs(74)(143)(51)(217)(179)
Loss on the revised cash flow of the Burnstone Debt4776—27762
Loss on foreign exchange differences and foreign currency translation9524651,5251,417950
Balance at end of the period22,72820,88720,29822,72820,298
1 During the six months ended 31 December 2021, Sibanye-Stillwater extended the maturity date for all of its lenders to 5 April 2023
2 During the year ended 31 December 2021, the Group extended the R5.5 billion RCF maturity date, which matures 11 November 2024
3 On 16 November 2021, the Group completed a two-tranche corporate bond offering of 4.0% Notes (US$675 million) due 16 November 2026 (the 2026 Notes) and 4.5% Notes (US$525 million) due 16 November 2029 (the 2029 Notes) (together the 2026 and 2029 Notes). At 31 December 2021, the portion of transaction costs accrued for and not yet settled amounted to R29 million
4 Other borrowings consist mainly of overnight facilities and borrowings acquired on acquisition of Keliber and Sandouville
Borrowings consist of:
Figures in million - SA rand
UnauditedUnauditedUnaudited
Dec 2022June 2022Dec 2021
US$600 million RCF1,2
———
R5.5 billion RCF1,2
———
2026 and 2029 Notes20,14019,22918,785
Burnstone Debt2,5401,6111,507
Other borrowings
48476
Borrowings22,72820,88720,298
Current portion of borrowings(122)(115)(107)
Non-current borrowings22,60620,77220,191
1 These facilities are both undrawn at 31 December 2022 and at the date of this report
2 The US$600 million RCF and the R5.5 billion RCF are affected by the LIBOR reform which came into effect on 1 January 2021. The R5.5 billion RCF is linked to JIBAR and is not drawn down, however the JIBAR is only expected to be impacted by the reform at a later stage and any impact thereof is to be considered when this occurs. The US$600 million RCF is linked to a US LIBOR, however the Group is in process to refinance this facility (refer note 16.2). Therefore, the Group was not impacted when the amendment became effective and no significant impact is expected on the condensed consolidated provisional financial statements for the year ended 31 December 2022
11.1 Capital management
Debt maturity
The following are contractually due, undiscounted cash flows resulting from maturities of borrowings, including interest payments:
Figures in million - SA rand
TotalWithin one yearBetween one and two yearsBetween two and three yearsBetween three and five yearsAfter five years
31 December 2022
- Capital
2026 and 2029 Notes20,436———11,4958,941
   Burnstone Debt132—25107——
   Other borrowings471574813
- Interest13,4128628658681,3449,473
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 38


Net cash to adjusted EBITDA
Figures in million - SA rand
Rolling 12 months
UnauditedUnauditedUnaudited
Dec 2022June 2022Dec 2021
Borrowings1
20,18819,27618,791
Cash and cash equivalents2
26,03827,21130,257
Net cash3
(5,850)(7,935)(11,466)
Adjusted EBITDA4
41,11150,61868,606
Net cash to adjusted EBITDA (ratio)5
(0.14)(0.16)(0.17)
1 Borrowings are only those borrowings that have recourse to Sibanye-Stillwater. Borrowings, therefore, exclude the Burnstone Debt
2 Cash and cash equivalents exclude cash of Burnstone
3 Net cash represents borrowings and bank overdraft less cash and cash equivalents. Borrowings are only those borrowings that have recourse to Sibanye-Stillwater and, therefore, exclude the Burnstone Debt. Net cash excludes cash of Burnstone
4 The adjusted earnings before interest, taxes, depreciation and amortisation (EBITDA) calculation is based on the definitions included in the facility agreements for compliance with the debt covenant formula, except for impact of new accounting standards and acquisitions, where the facility agreements allow the results from the acquired operations to be annualised. Adjusted EBITDA may not be comparable to similarly titled measures of other companies. Adjusted EBITDA as defined and reconciled below, is not a measure of performance under IFRS and should be considered in addition to, and not as a substitute for, other measures of financial performance and liquidity
5 Net cash to adjusted EBITDA ratio is defined as net debt as of the end of a reporting period divided by adjusted EBITDA of the 12 months ended on the same reporting date. Non-IFRS measures such as net (cash)/debt to adjusted EBITDA ratio are the responsibility of the Group’s Board of Directors and are presented for illustration purposes only, and because of its nature, net (cash)/ debt to adjusted EBITDA should not be considered as a representation of financial performance under IFRS
Reconciliation of profit before royalties, carbon tax and tax to adjusted EBITDA
Figures in million - SA rand
Six months endedYear ended
UnauditedUnauditedUnauditedUnauditedUnaudited
Dec 2022June 2022Dec 2021Dec 2022Dec 2021
Profit before royalties, carbon tax and tax10,80018,92814,24729,72850,275
Adjusted for:
Amortisation and depreciation3,8633,2244,4957,0878,293
Interest income(614)(589)(578)(1,203)(1,202)
Finance expense1,3781,4621,2352,8402,496
Share-based payments10611285218383
Loss on financial instruments3,8803995,4374,2796,279
Gain on foreign exchange differences(476)(140)(1,527)(616)(1,149)
Share of results of equity-accounted investees after tax(517)(770)(585)(1,287)(1,989)
Change in estimate of environmental rehabilitation obligation, and right of recovery receivable and payable(71)—(162)(71)(167)
Gain on disposal of property, plant and equipment(68)(94)(30)(162)(36)
(Reversal of impairments)/impairments(6)—5,148(6)5,148
Restructuring costs3273669363107
Transaction costs44108102152140
IFRS 16 lease payments(74)(89)(71)(163)(142)
Occupational healthcare (gain)/expense(186)(25)10(211)(14)
Loss/(gain) on deconsolidation of subsidiary309(1)—308—
Profit on sale of Lonmin Canada(145)——(145)—
Profit on sale of St Helena Hospital——(16)—(16)
Early redemption premium on the 2025 Notes——196—196
Loss due to dilution of interest in joint operation——2—4
Adjusted EBITDA18,55022,56128,05741,11168,606
12. Share-based payment obligations
The following table summarises the share-based payment obligations of the group:
Figures in million - SA rand
UnauditedUnauditedUnaudited
Dec 2022June 2022Dec 2021
Cash-settled share-based payment — Rustenburg operation B-BBEE transaction1
3,1122,1272,067
Cash-settled share-based payment — Marikana B-BBEE transaction2
1,732607560
Cash-settled share-based payment — Employee incentive scheme431351260
Balance at the end of the period5,2753,0852,887
Current portion of cash-settled share-based payment obligations(284)(252)(58)
Non-current portion of cash-settled share-based payment obligations4,9912,8332,829
1 Included in the movement is a fair value loss of R1,189 million recognised for the year ended 31 December 2022 (R985 million and R204 million for the six months ended 31 December 2022 and 30 June 2022, respectively), offset by payments made of R144 million during the six months ended 30 June 2022. The fair value loss is recognised in total loss on financial instruments (refer note 4)
2 The movement is mainly due to a fair value loss of R965 million recognised for the year ended 31 December 2022 (R875 million and R91 million recognised for the six months ended 31 December 2022 and 30 June 2022, respectively), which is partially offset by payments made of R44 million during the six months ended 30 June 2022. The fair value loss is recognised in total loss on financial instruments (refer note 4). Also included in the movement is a cash-settled share-based payment obligation recognised of R251 million due to the deconsolidation of the Bapo Ba Mogale Local Economic Development Trust (Bapo trust). The deconsolidation was as a result of significant changes in the Bapo trust deed, which resulted in joint control over the relevant activities of the Bapo trust for the Group. The deconsolidation resulted in a total loss on deconsolidation of R309 million recognised in Other costs as detailed in profit or loss. The total loss on deconsolidation consists of the loss upon recognition of the R251 million cash-settled share-based payment obligation and the derecognition of cash and cash equivalents of R58 million held by the Bapo trust
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 39


13. Other payables
Figures in million - SA rand
UnauditedUnauditedUnaudited
NoteDec 2022June 2022Dec 2021
Rustenburg deferred payment13.13,5182,6536,920
Contingent consideration (related to the SFA (Oxford) Limited acquisition)——100
Right of recovery payable343432
Deferred consideration (related to Pandora acquisition)128239400
Marikana dividend obligation1
2,1291,4281,539
Other non-current payables582531373
Other payables6,3914,8859,364
Current portion of other payables(3,891)(2,856)(4,765)
Non-current other payables2,5002,0294,599
1 Included in the movement is a fair value loss of R650 million for the year ended 31 December 2022 (R625 million and R25 million recognised for the six months ended 31 December 2022 and 30 June 2022, respectively), which is primarily as a result of an increase in the long-term PGM basket price. The movement also includes payments made of R225 million during the six months ended 30 June 2022
13.1 Rustenburg deferred payment
Figures in million - SA rand
Six months endedYear ended
UnauditedUnauditedUnauditedUnauditedUnaudited
NotesDec 2022June 2022Dec 2021Dec 2022Dec 2021
Balance at the beginning of the period2,6536,9202,1996,9204,355
Interest charge 39217463266158
Payment—(4,441)—(4,441)(2,246)
Loss on revised estimated cash flows1
4773—4,6587734,653
Balance at end of the period2
3,5182,6536,9203,5186,920
Current portion of liability(3,518)(2,653)(4,315)(3,518)(4,315)
Non-current portion of liability——2,605—2,605
1 The loss on revised estimated cash flows is primarily as a result of actual profit compared to the 2022 life-of-mine due to the high price environment that existed in FY2022, which will impact the final payment on 30 March 2023
2 The Rustenburg deferred payment is calculated as being equal to 35% of the distributable free cash flow generated by the Rustenburg operation over a six year (1 January 2017 to 31 December 2022) period from inception (latest of transaction closing or 1 January 2017), subject to a minimum payment of R3 billion. The deferred payment liability at 31 December 2022 was calculated based on the actual distributable free cash flow of the Rustenburg operation for the year ended 31 December 2022. For prior periods, the deferred payment liability was calculated using estimated cash flow models that used several key assumptions, including estimates of future sales volumes, PGM prices, operating costs and capital expenditure
14. Fair value of financial assets and financial liabilities, and risk management
14.1 Measurement of fair value
The Group uses the following hierarchy for determining and disclosing the fair value of financial instruments:
•Level 1: unadjusted quoted prices in active markets for identical assets or liabilities
•Level 2: inputs other than quoted prices in level 1 that are observable for the asset or liability, either directly (as prices) or indirectly (derived from prices)
•Level 3: inputs for the asset or liability that are not based on observable market data (unobservable inputs)
The following table sets out the Group’s significant financial instruments measured at fair value by level within the fair value hierarchy:
Figures in million - SA rand
UnauditedUnauditedUnaudited
Dec 2022June 2022Dec 2021
Level 1Level 2Level 3Level 1Level 2Level 3Level 1Level 2Level 3
Financial assets measured at fair value
Environmental rehabilitation obligation funds1
4,528778—4,469750—4,477725—
Trade receivables — PGM concentrate sales2
—3,564——3,570——3,794—
Other investments3
2,320—8552,111—6773,143—224
Asset held for sale4
———————280—
Palladium hedge contract5
—50——193——286—
1 Environmental rehabilitation obligation funds comprise a fixed income portfolio of bonds as well as fixed and notice deposits. The environmental rehabilitation obligation funds are stated at fair value based on the nature of the fund’s investments
2 The fair value for trade receivables measured at fair value through profit or loss are determined based on ruling market prices, volatilities and interest rates
3 The fair values of listed investments are based on the quoted prices available from the relevant stock exchanges. The carrying amounts of other short-term investment products with short maturity dates approximate fair value. The fair values of non-listed investments are determined through valuation techniques that include inputs that are not based on observable market data. These inputs include price/book ratios as well as marketability and minority shareholding discounts which are impacted by the size of the shareholding. The difference between other investments in the statement of financial position and the table above, relates to investments measured at amortised cost, with carrying amounts that approximate fair values
4 The fair value of the asset held for sale was derived from the quoted Generation Mining share price
5 The fair value of the palladium hedge is determined using on a Monte Carlo simulation model based on market forward prices, volatilities and interest rates

Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 40


Fair value of financial instruments
The table below shows the fair value and carrying amount of financial instruments where the carrying amount does not approximate fair value:
Figures in million - SA rand
Carrying valueFair Value
Level 1Level 2Level 3
31 December 2022 (Unaudited)
2026 and 2029 Notes1
20,14017,379——
Burnstone Debt2
2,540——2,245
Total22,68017,379—2,245
30 June 2022 (Unaudited)
2026 and 2029 Notes1
19,22915,965——
Burnstone Debt2
1,611——2,614
Total20,84015,965—2,614
31 December 2021 (Unaudited)
2026 and 2029 Notes1
18,78518,664——
Burnstone Debt2
1,507——2,996
Total20,29218,664—2,996
1 The fair value is based on the quoted market prices of the notes
2 The fair value of the Burnstone Debt has been derived from discounted cash flow models. These models use several key assumptions, including estimates of future sales volumes, Gold prices, operating costs, capital expenditure and discount rate. The Burnstone long-term gold price at 31 December 2022 was R793,473/kg (31 December 2021 and 30 June 2022: R729,270/kg) and the discount rate applied was 10.52% (30 June 2022: 5.55% and 31 December 2021: 4.18%). The fair value estimate is sensitive to changes in the key assumptions, for example, increases in the market related discount rate would decrease the fair value if all other inputs remain unchanged. The extent of the fair value changes would depend on how inputs change in relation to each other
14.2 Risk management activities
Liquidity risk: working capital and going concern assessment
For the year ended 31 December 2022, the Group realised a profit of R18,980 million (31 December 2021: R33,796 million). As at 31 December 2022 the Group’s current assets exceeded its current liabilities by R40,545 million (31 December 2021: R44,290 million) and the Group’s total assets exceeded its total liabilities by R91,004 million (31 December 2021: R81,345 million). During the year ended 31 December 2022 the Group generated net cash from operating activities of R15,543 million (31 December 2021: R32,256 million).
The Group currently has committed undrawn debt facilities of R16,403 million at 31 December 2022 (31 December 2021: R15,749 million) and cash balances of R26,076 million (31 December 2021: R30,292 million). The most immediate debt maturities are the US$600 million USD RCF maturing in April 2023 and the R5.5 billion ZAR RCF maturing in November 2024, both which was undrawn at 31 December 2022 and at the date of approval of these condensed consolidated provisional financial statements. The Group is at an advance stage to refinance (and upsize) its US$ RCF. Sibanye-Stillwater’s leverage ratio (net (cash)/debt to adjusted EBITDA) as at 31 December 2022 was (0.1):1 (31 December 2021 was (0.2):1) and its interest coverage ratio (adjusted EBITDA to net finance charges/(income)) was 93:1 (31 December 2021 was (5,281):1). Both considerably better than the maximum permitted leverage ratio of at most 2.5:1 and minimum required interest coverage ratio of 4.0:1, calculated on a quarterly basis, required under the US$600 million RCF and the R5.5 billion RCF. At the date of approving these condensed consolidated provisional financial statements there were no significant event which had a significant negative impact on the Group’s strong liquidity position.
Notwithstanding the exceptionally strong liquidity position and financial outlook, events such as the outbreak of infectious diseases or uncontrolled COVID-19 infection rates in recent history could impose restrictions on all or some of our operations. Events such as these could negatively impact the production outlook and deteriorate the Group’s forecasted liquidity position which may require the Group to further increase operational flexibility by adjusting mine plans and reducing capital expenditure. The Group could also, if necessary, consider options to increase funding flexibility which may include, amongst others, additional loan facilities or debt capital market issuances, streaming facilities, prepayment facilities or, if other options are not deemed preferable or achievable by the Board, an equity capital raise. The Group could also, with lender approval, request covenant amendments or restructure facilities. During past adversity management has successfully implemented similar actions.
Management believes that the cash forecasted to be generated by operations, cash on hand, the committed unutilised debt facilities as well as additional funding opportunities will enable the Group to continue to meet its obligations as they fall due for a period of at least eighteen months after the reporting date. The condensed consolidated provisional financial statements for the year ended 31 December 2022, therefore, have been prepared on a going concern basis.
15. Contingent liabilities
15.1 Notice from Appian Capital to commence legal proceedings
On 26 October 2021, Sibanye-Stillwater entered into share purchase agreements to acquire the Santa Rita nickel mine and Serrote copper mine (the Atlantic Nickel SPA and the MVV SPA, respectively) from affiliates of Appian Capital Advisory LLP (Appian). Subsequent to signing the agreements, Appian informed Sibanye-Stillwater that a geotechnical event occurred at the Santa Rita open pit operation. After becoming aware of the geotechnical event, Sibanye-Stillwater assessed the event and its effect and concluded that the event was and was reasonably expected to be material and adverse to the business, financial condition, results of operations, the properties, assets, liabilities or operations of Santa Rita. Accordingly, pursuant to the terms of the Atlantic Nickel SPA, on 24 January 2022, Sibanye-Stillwater gave notice of termination of the Atlantic Nickel SPA. As the MVV SPA was conditional on the closing of the Atlantic Nickel SPA, which had become impossible to satisfy, on the same date Sibanye-Stillwater also gave notice of termination of the MVV SPA.
On 27 May 2022, Appian initiated legal proceedings before the High Court of England and Wales against Sibanye-Stillwater. On 3 August 2022, the Group filed its defence. Sibanye-Stillwater’s view is that the Atlantic Nickel SPA and the MVV SPA were rightfully terminated and the Group is confident that the claim will be defended successfully. The trial is set to begin in June 2024, with the key pre-trial steps taking place over the remainder of 2023. The proceedings are in early stages and additional information and estimates of potential outcomes are unavailable.
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 41


16. Events after the reporting period
There were no events that could have a material impact on the financial results of the Group after 31 December 2022 up to the date on which the condensed consolidated provisional financial statements for the six months and year ended 31 December 2022 were authorised for issue, other than those discussed below:
16.1 Section 189A consultations
On 1 November 2022, Sibanye-Stillwater announced that it had entered into a consultation process in terms of Section 189A of the Labour Relations Act (S189) with organised labour and other affected stakeholders, regarding the possible restructuring of the Group's SA gold operations pursuant to ongoing losses experienced at the Beatrix 4 shaft and the impact of depleting mineral reserves at the Kloof 1 plant. The CCMA facilitation process concluded with the last meeting on 1 February 2023 and a close-out meeting is scheduled to be held on 28 February 2023.
16.2 Refinancing of the US$600 million RCF
Sibanye-Stillwater is in the process of refinancing its US$600 million RCF before it matures in April 2023. The new facility is planned to be a minimum of US$800 million RCF for a term of three years, with two optional 1-year extensions (3 + 1 + 1), from the effective date of the facility. The facility will be used in financing of the Group's ongoing capital expenditure, working capital and general corporate expenditure requirements, which may include the financing of future acquisitions or business combinations. The RCF will be linked to a Secured Overnight Financing Rate which is a recently effective interest rate published as part of the IBOR reform.
16.3 Off-market takeover offer for New Century Resources Limited (New Century)
On 21 February 2023, Sibanye-Stillwater announced the launch of an off-market takeover offer, through its wholly-owned subsidiary Sibanye Resources Australia Proprietary Limited, at A$1.10 cash consideration per share for all the shares in New Century that Sibanye-Stillwater does not own. Prior to the takeover offer, Sibanye-Stillwater was the largest shareholder in New Century with a shareholding of 19.9%. Sibanye-Stillwater will pay up to US$83 million should it acquire the additional shares in New Century under the takeover offer. Based on the most recent information on 27 February 2023, Sibanye-Stillwater successfully obtained a total shareholding in New Century of 52.9% at a cash consideration amounting to approximately A$48 million for the additional shares obtained. The proposed takeover is in line with the Group’s strategy to invest in the circular economy and to be a global leader in tailings retreatment and recycling.
Management is in the process of assessing Sibanye-Stillwater's control over New Century as a result of the takeover and will then start the process of identifying and measuring the assets and liabilities in accordance with IFRS 3 for, amongst others, property, plant and equipment, contingent liabilities, inventory, provisions, as well as any deferred tax implications to the extent applicable.
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 42


17. Segment reporting
Figures in million
For the six months ended 31 Dec 2022 (Unaudited)
GROUPUS PGM OPERATIONSSA OPERATIONSEuropeGROUP
SA randTotalTotal US PGMUndergroundRecyclingTotal SA
Operations
Total
SA PGM
Rusten-
burg
MarikanaKroondalPlatinum
Mile
Mimosa
Corporate
and re-
conciling
items1
Total SA goldDrie-
fontein
KloofBeatrixCookeDRD-
GOLD
Corporate
and re-
conciling
items1
Total
Battery Metals
Sandouville
Corporate
and re-
conciling
items1,2
Cor-
porate1
Revenue67,90921,9606,01115,94945,26733,40614,35014,4303,9636631,928(1,928)11,8613,0163,1812,4325782,654—967967—(285)
Underground45,4376,0116,011—39,71131,65813,26514,4303,963—1,928(1,928)8,0532,8362,8262,391——————(285)
Surface5,556———5,5561,7481,085——663——3,808180355415782,654—————
Recycling/processing16,91615,949—15,949———————————————967967——
Cost of sales, before amortisation and depreciation(47,512)(18,892)(3,619)(15,273)(27,114)(15,499)(6,887)(6,530)(1,774)(308)(1,046)1,046(11,615)(2,989)(3,564)(2,628)(496)(1,938)—(1,506)(1,506)——
Underground(26,897)(3,619)(3,619)—(23,278)(14,575)(6,271)(6,530)(1,774)—(1,046)1,046(8,703)(2,852)(3,254)(2,597)———————
Surface(3,836)———(3,836)(924)(616)——(308)——(2,912)(137)(310)(31)(496)(1,938)—————
Recycling/processing(16,779)(15,273)—(15,273)———————————————(1,506)(1,506)——
Net other cash costs3
(1,847)(83)(83)—(1,610)(924)(11)(507)(82)(168)—(156)(686)(55)(56)(33)(390)(22)(130)(99)(14)(85)(55)
Adjusted EBITDA18,5502,9852,30967616,54316,9837,4527,3932,107187882(1,038)(440)(28)(439)(229)(308)694(130)(638)(553)(85)(340)
Amortisation and depreciation(3,863)(1,379)(1,377)(2)(2,387)(1,256)(511)(628)(91)(21)(190)185(1,131)(482)(311)(242)—(79)(17)(97)(92)(5)—
Interest income614143746947120721101602284(81)26445362319155(14)————
Finance expense(1,378)(507)(507)—(691)(329)(1,953)(151)(59)—(17)1,851(362)(50)(47)(51)(43)(34)(137)(8)(6)(2)(172)
Share-based payments(106)(17)(17)—(87)(34)(13)(19)(2)———(53)(11)(11)(8)—(10)(13)———(2)
Net other4
(2,742)(156)(156)—(2,742)(2,525)(9,454)(1,487)2418(175)8,342(217)71317(53)13(214)116447240
Non-underlying items5
(275)(7)(7)—(234)(140)5(141)12——(16)(94)16(12)(281)(1)—184———(34)
Royalties and carbon tax(865)———(865)(818)(565)(245)(6)—(57)55(47)(15)(16)(13)(3)——————
Profit before tax9,9351,06231974310,00812,088(5,018)4,8232,2621965279,298(2,080)(518)(787)(784)(389)739(341)(627)(607)(20)(508)
Current taxation(4,345)(318)(4,023)(3,903)(1,766)(1,496)(586)(56)(35)36(120)(1)———(106)(13)———(4)
Deferred taxation1,049202886(364)37(354)(48)1(92)921,25076(221)128—(79)1,346(39)—(39)—
Profit/(loss) for the period6,6399466,8717,821(6,747)2,9731,6281414009,426(950)(443)(1,008)(656)(389)554992(666)(607)(59)(512)
Attributable to:
Owners of the parent6,3809466,5987,817(6,747)2,9691,6281414009,426(1,219)(443)(1,008)(656)(389)278999(652)(607)(45)(512)
Non-controlling interest holders259—2734—4————269————276(7)(14)—(14)—
Sustaining capital expenditure(2,997)(807)(806)(1)(2,129)(1,239)(385)(681)(158)(15)(570)570(890)(263)(303)(87)—(237)—(61)(61)——
Ore reserve development(3,956)(1,610)(1,610)—(2,346)(1,184)(372)(812)————(1,162)(542)(435)(185)———————
Growth projects(2,802)(815)(815)—(1,432)(520)—(519)———(1)(912)—(156)——(118)(638)(555)—(555)—
Total capital expenditure(9,755)(3,232)(3,231)(1)(5,907)(2,943)(757)(2,012)(158)(15)(570)569(2,964)(805)(894)(272)—(355)(638)(616)(61)(555)—
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 43


For the six months ended 31 Dec 2022 (Unaudited)
GROUPUS PGM OPERATIONSSA OPERATIONSEuropeGROUP
US dollars6
TotalTotal US PGMUndergroundRecyclingTotal SA
Operations
Total
SA PGM
Rusten-
burg
MarikanaKroondalPlatinum
Mile
Mimosa
Corporate
and re-
conciling
items1
Total
SA gold
Drie-
fontein
KloofBeatrixCookeDRD-
GOLD
Corporate
and re-
conciling
items1
Total
Battery Metals
Sandouville
Corporate
and re-
conciling
items1,2
Cor-
porate1
Revenue3,8781,2483379112,5951,89382081122538109(110)70217919014734152—5151—(16)
Underground2,595337337—2,2741,792757811225—109(110)482168169145——————(16)
Surface321———32110163——38——2201121234152—————
Recycling/processing962911—911———————————————5151——
Cost of sales, before amortisation and depreciation(2,721)(1,079)(207)(872)(1,558)(881)(395)(368)(102)(18)(60)62(677)(174)(207)(156)(29)(111)—(84)(84)——
Underground(1,544)(207)(207)—(1,337)(828)(360)(368)(102)—(60)62(509)(166)(189)(154)———————
Surface(221)———(221)(53)(35)——(18)——(168)(8)(18)(2)(29)(111)—————
Recycling/processing(956)(872)—(872)———————————————(84)(84)——
Net other cash costs3
(112)(5)(5)—(98)(56)(2)(30)(5)(9)—(10)(42)(3)(3)(2)(23)(2)(9)(6)(1)(5)(3)
Adjusted EBITDA1,045164125399399564234131181149(58)(17)2(20)(11)(18)39(9)(39)(34)(5)(19)
Amortisation and depreciation(224)(79)(79)—(140)(72)(29)(37)(5)(1)(11)11(68)(28)(19)(15)—(5)(1)(5)(5)——
Interest income35954261126415(7)1532119(1)————
Finance expense(78)(29)(29)—(38)(17)(109)(9)(4)—(1)106(21)(3)(3)(3)(2)(2)(8)(1)(1)—(10)
Share-based payments(6)(1)(1)—(5)(2)(1)(1)(1)——1(3)—(1)(1)——(1)————
Net other4
(170)(9)(9)—(170)(157)(578)(91)15—(9)506(13)111(3)1(14)6243
Non-underlying items5
(15)———(13)(7)1(8)1——(1)(6)1(1)(17)——11———(2)
Royalties and carbon tax(49)———(49)(46)(32)(13)(1)—(3)3(3)(1)(1)(1)———————
Profit before tax538551243550666(323)2601271130561(116)(25)(42)(46)(22)42(23)(39)(38)(1)(28)
Current taxation(246)(18)(228)(221)(103)(83)(33)(3)(2)3(7)————(6)(1)————
Deferred taxation671257(18)5(20)(3)—(5)5754(13)7—(5)82(2)—(2)—
Profit/(loss) for the period35949379427(421)15791823569(48)(21)(55)(39)(22)3158(41)(38)(3)(28)
Attributable to:
Owners of the parent34449363427(421)15791823569(64)(21)(55)(39)(22)1558(40)(38)(2)(28)
Non-controlling interest holders15—16———————16————16—(1)—(1)—
Sustaining capital expenditure(175)(47)(47)—(125)(73)(22)(40)(10)(1)(34)34(52)(16)(18)(5)—(13)—(3)(3)——
Ore reserve development(232)(93)(93)—(139)(69)(22)(47)————(70)(33)(26)(11)———————
Growth projects(167)(48)(48)—(85)(30)—(30)————(55)—(9)——(8)(38)(34)—(34)—
Total capital expenditure(574)(188)(188)—(349)(172)(44)(117)(10)(1)(34)34(177)(49)(53)(16)—(21)(38)(37)(3)(34)—
1Corporate and reconciling items represent the items to reconcile segment data to condensed consolidated financial statement totals. This does not represent a separate segment as it does not generate revenue. Group corporate includes the Wheaton Stream transaction and corporate transaction costs
2Corporate and reconciling items for Battery Metals includes a net loss of R143 million for Keliber
3Net other cash costs consist of service entity and sundry income (R167 million) and other costs as detailed in profit or loss, excluding the loss on deconsolidation of the Bapo Trust (R309 million) and include lease payments (R74 million) to conform with the adjusted EBITDA reconciliation disclosed in note 11.1
4Net other consists of loss on financial instruments, loss on foreign exchange differences as detailed in profit or loss, change in estimate of environmental rehabilitation obligation, and right of recovery receivable and payable (income of R71 million) and the add back of the lease payment referred to in footnote 3 above. Corporate and reconciling items net other includes the share of results of equity-accounted investees after tax as detailed in profit or loss
5Non-underlying items consists of gain on disposal of property, plant and equipment, reversal of impairments, restructuring costs, and transaction costs as detailed in profit or loss and also includes profit on sale of Lonmin Canada (R145 million), loss on deconsolidation of the Bapo Trust (R309 million)and occupational healthcare income as detailed in profit or loss
6The average exchange rate for the six months ended 31 December 2022 was R17.33/US$



Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 44


Figures in millions
For the six months ended 30 Jun 2022 (Unaudited)
GROUPUS PGM OPERATIONSSA OPERATIONSEuropeGROUP
SA randTotalTotal US PGMUndergroundRecyclingTotal SA
Operations
Total
SA PGM
Rusten-
burg
MarikanaKroondalPlatinum
Mile
Mimosa
Corporate
and re-
conciling
items1
Total
SA gold
Drie-
fontein
KloofBeatrixCookeDRD-
GOLD
Corporate
and re-
conciling
items1
Total
Battery Metals
Sandouville2
Corporate
and re-
conciling
items1,3
Cor-
porate1
Revenue70,37924,1307,81216,31844,24038,25914,75418,3234,4087742,339(2,339)5,9811,4701,3052493372,620—2,1732,173—(164)
Underground46,8887,8127,812—39,24036,52413,79318,3234,408—2,339(2,339)2,7161,3771,098241——————(164)
Surface5,000———5,0001,735961——774——3,2659320783372,620—————
Recycling18,49116,318—16,318———————————————2,1732,173——
Cost of sales, before amortisation and depreciation(47,025)(19,560)(3,840)(15,720)(25,340)(16,781)(6,659)(8,073)(1,774)(275)(890)890(8,559)(2,292)(2,817)(1,282)(326)(1,842)—(2,125)(2,125)——
Underground(25,837)(3,840)(3,840)—(21,997)(15,953)(6,106)(8,073)(1,774)—(890)890(6,044)(2,233)(2,567)(1,244)———————
Surface(3,343)———(3,343)(828)(553)——(275)——(2,515)(59)(250)(38)(326)(1,842)—————
Recycling(17,845)(15,720)—(15,720)———————————————(2,125)(2,125)——
Net other cash costs4
(793)4949—(854)(326)162(181)(46)(239)(21)(1)(528)(118)(111)(90)(327)62561213(1)—
Adjusted EBITDA22,5614,6194,02159818,04621,1528,25710,0692,5882601,428(1,450)(3,106)(940)(1,623)(1,123)(316)840566061(1)(164)
Amortisation and depreciation(3,224)(1,424)(1,422)(2)(1,739)(1,162)(470)(577)(89)(19)(152)145(577)(239)(158)(63)(3)(97)(17)(61)(61)——
Interest income58916671594221952211349818(15)2272321121611045———1
Finance expense(1,462)(445)(445)—(856)(502)(2,665)(169)(52)—(19)2,403(354)(50)(48)(44)(43)(44)(125)(7)(7)—(154)
Share-based payments(112)(30)(30)—(82)(39)(14)(17)(7)(1)——(43)(9)(4)(2)—(9)(19)————
Net other5
600(87)(87)—687500101(112)62(3)(324)77618761317315133(5)(21)165
Non-underlying items6
(24)22—81855(16)—(1)1573(6)(2)—(1)1072———(107)
Royalties and carbon tax(959)———(959)(954)(458)(490)(7)—(70)71(5)(7)(6)10(2)——————
Profit before tax17,9692,8012,04675515,60019,1984,7788,8222,5282458801,945(3,598)(1,222)(1,807)(1,193)(346)825145(13)(28)15(419)
Current taxation(4,937)(337)(4,600)(4,470)(1,403)(2,270)(702)(74)(173)152(130)(5)(3)——(120)(2)————
Deferred taxation(691)113(804)(968)(627)(339)(12)7(46)4916483726—(46)139————
Profit/(loss) for the period12,3412,57710,19613,7602,7486,2131,8141786612,146(3,564)(1,219)(1,773)(1,167)(346)659282(13)(28)15(419)
Attributable to:
Owners of the parent12,0162,5779,87113,7602,7486,2131,8141786612,146(3,889)(1,219)(1,773)(1,167)(346)334282(13)(28)15(419)
Non-controlling interest holders325—325———————325————325—————
Sustaining capital expenditure(1,949)(378)(378)—(1,542)(817)(305)(391)(115)(6)(294)294(725)(95)(152)(68)—(410)—(29)(29)——
Ore reserve development(2,684)(1,277)(1,277)—(1,407)(939)(315)(624)————(468)(252)(185)(31)———————
Growth projects(1,511)(530)(530)—(807)(405)—(405)————(402)—(54)(4)—(6)(338)(174)—(174)—
Total capital expenditure(6,144)(2,185)(2,185)—(3,756)(2,161)(620)(1,420)(115)(6)(294)294(1,595)(347)(391)(103)—(416)(338)(203)(29)(174)—
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 45


For the six months ended 30 Jun 2022 (Unaudited)
GROUPUS PGM OPERATIONSSA OPERATIONSEuropeGROUP
US dollars7
TotalTotal US PGMUndergroundRecyclingTotal SA
Operations
Total
SA PGM
Rusten-
burg
MarikanaKroondalPlatinum
Mile
Mimosa
Corporate
and re-
conciling
items1
Total
SA gold
Drie-
fontein
KloofBeatrixCookeDRD-
GOLD
Corporate
and re-
conciling
items1
Total
Battery Metals
Sandouville2
Corporate
and re-
conciling
items1,3
Cor-
porate1
Revenue4,5701,5675071,0602,8732,4859581,19028650152(151)38895841722170—141141—(11)
Underground3,045507507—2,5492,3738961,190286—152(151)176897116——————(11)
Surface324———32411262——50——212613122170—————
Recycling1,2011,060—1,060———————————————141141——
Cost of sales, before amortisation and depreciation(3,054)(1,270)(249)(1,021)(1,646)(1,090)(432)(524)(115)(18)(58)57(556)(149)(183)(83)(21)(120)—(138)(138)——
Underground(1,678)(249)(249)—(1,429)(1,036)(396)(524)(115)—(58)57(393)(145)(167)(81)———————
Surface(217)———(217)(54)(36)——(18)——(163)(4)(16)(2)(21)(120)—————
Recycling(1,159)(1,021)—(1,021)———————————————(138)(138)——
Net other cash costs4
(51)33—(55)(21)11(12)(3)(16)(1)—(34)(8)(7)(6)(21)4411——
Adjusted EBITDA1,465300261391,1721,3745376541681693(94)(202)(62)(106)(72)(20)54444—(11)
Amortisation and depreciation(209)(92)(92)—(113)(76)(31)(37)(6)(1)(10)9(37)(16)(10)(4)—(6)(1)(4)(4)——
Interest income3810—10281417311114111173————
Finance expense(95)(29)(29)—(56)(33)(173)(11)(3)—(1)155(23)(3)(3)(3)(3)(3)(8)———(10)
Share-based payments(7)(2)(2)—(5)(2)(1)(1)————(3)(1)———(1)(1)————
Net other5
40(6)(6)—46347(7)4—(21)5112—11—19—(1)1—
Non-underlying items6
(1)———6———(1)——16————15———(7)
Royalties and carbon tax(62)———(62)(63)(30)(32)——(5)41——1———————
Profit before tax1,169181132491,0161,2483105731651657127(232)(81)(117)(76)(22)5311—(1)1(28)
Current taxation(321)(22)(299)(291)(91)(147)(46)(5)(11)9(8)————(8)—————
Deferred taxation(45)7(52)(63)(41)(22)(1)—(3)411122—(3)9————
Profit/(loss) for the period8031666658941784041181143140(229)(80)(115)(74)(22)4220—(1)1(28)
Attributable to:—
Owners of the parent7821666448941784041181143140(250)(80)(115)(74)(22)2120—(1)1(28)
Non-controlling interest holders21—21———————21————21—————
Sustaining capital expenditure(126)(25)(25)—(99)(52)(20)(25)(7)—(19)19(47)(6)(10)(4)—(27)—(2)(2)——
Ore reserve development(174)(83)(83)—(91)(61)(20)(41)————(30)(16)(12)(2)———————
Growth projects(97)(34)(34)—(52)(26)—(26)————(26)—(4)———(22)(11)—(11)—
Total capital expenditure(397)(142)(142)—(242)(139)(40)(92)(7)—(19)19(103)(22)(26)(6)—(27)(22)(13)(2)(11)—
1Corporate and reconciling items represent the items to reconcile segment data to condensed consolidated financial statement totals. This does not represent a separate segment as it does not generate revenue. Group corporate includes the Wheaton Stream transaction and corporate transaction costs
2The Battery Metals results for the six months ended 30 June 2022 includes the results of Sandouville for the five months since acquisition (refer note 10.2)
3Corporate and reconciling items for Battery Metals includes Keliber since the effective date of acquisition (refer note 10.1)
4Net other cash costs consist of service entity and sundry income (R726 million) and other costs as detailed in profit or loss and include lease payments (R89 million) to conform with the adjusted EBITDA reconciliation disclosed in note 11.1
5Net other consists of loss on financial instruments, loss on foreign exchange differences as detailed in profit or loss and the add back of the lease payment referred to in footnote 4 above. Corporate and reconciling items net other includes the share of results of equity-accounted investees after tax as detailed in profit or loss
6Non-underlying items consists of gain on disposal of property, plant and equipment, impairments, restructuring costs and transaction costs as detailed in profit or loss and also includes non-cash gain on deregistration of subsidiary in the Group (R1 million)and occupational healthcare income as detailed in profit or loss
7The average exchange rate for the six months ended 30 June 2022 was R15.40/US$



Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 46



Figures are in millions
For the six months ended 31 Dec 2021 (Unaudited)
GROUPUS PGM OPERATIONSSA OPERATIONSGROUP
SA randTotalTotal US PGMUndergroundRecyclingTotal SA
Operations
Total
SA PGM
Rusten-
burg
MarikanaKroondalPlatinum
Mile
Mimosa
Corporate
and re-
conciling
items1
Total
SA gold
Drie-
fontein
KloofBeatrixCookeDRD-
GOLD
Corporate
and re-
conciling
items1
Cor-
porate1
Revenue82,24129,9188,62221,29652,46337,41213,74019,2513,6797431,674(1,675)15,0514,2544,7723,0484792,498—(140)
Underground55,2488,6228,622—46,76635,47612,54719,2513,679—1,674(1,675)11,2904,0564,2932,941———(140)
Surface5,697———5,6971,9361,193——743——3,7611984791074792,498——
Recycling21,29621,296—21,296————————————————
Cost of sales, before amortisation and depreciation(52,860)(24,755)(4,216)(20,539)(28,105)(16,367)(5,952)(8,328)(1,785)(303)(813)814(11,738)(3,056)(3,961)(2,561)(408)(1,752)——
Underground(28,802)(4,216)(4,216)—(24,586)(15,539)(5,427)(8,328)(1,785)—(813)814(9,047)(2,932)(3,623)(2,492)————
Surface(3,519)———(3,519)(828)(525)——(303)——(2,691)(124)(338)(69)(408)(1,752)——
Recycling(20,539)(20,539)—(20,539)————————————————
Net other cash costs2
(1,324)22—(1,326)(775)108(554)(48)(243)(21)(17)(551)(49)(47)(38)(312)(24)(81)—
Adjusted EBITDA28,0575,1654,40875723,03220,2707,89610,3691,846197840(878)2,7621,149764449(241)722(81)(140)
Amortisation and depreciation(4,495)(1,429)(1,427)(2)(3,066)(1,353)(462)(595)(275)(18)(142)139(1,713)(672)(545)(368)(6)(98)(24)—
Interest income578163915440011211534538(8)28835251771099515
Finance expense(1,235)(463)(453)(10)(621)(350)(2,217)(192)(62)—(3)2,124(271)(51)(44)(41)(34)(30)(71)(151)
Share-based payments(85)(8)(8)—(77)(10)(4)(5)(1)———(67)(4)(5)(5)—(10)(43)—
Net other3
(3,092)556556—(3,699)(4,958)(12,246)(618)35346(41)7,5481,259781686171,12551
Non-underlying items4
(5,481)(230)(230)—(5,171)412(1)——2(5,175)(210)(3,680)(1,286)(1)—2(80)
Royalties and carbon tax(1,073)———(1,073)(975)(512)(458)(6)—(65)66(98)(50)(23)(17)(2)—(6)—
Profit before tax13,1743,7542,8558999,72512,740(7,533)8,5561,8992285978,993(3,015)204(3,500)(1,235)(191)710997(305)
Current taxation(5,675)(582)(5,084)(4,937)(1,748)(2,497)(558)(124)(157)147(147)(6)(7)(3)—(141)10(9)
Deferred taxation978(150)1,128957989(115)2259(9)111711421,163221—(44)(1,311)—
Profit/(loss) for the period8,4773,0225,7698,760(8,292)5,9441,3631634319,151(2,991)340(2,344)(1,017)(191)525(304)(314)
Attributable to:
Owners of the parent8,2183,0225,5108,760(8,292)5,9441,3631634319,151(3,250)340(2,344)(1,017)(191)266(304)(314)
Non-controlling interest holders259—259———————259————259——
Sustaining capital expenditure(2,469)(294)(290)(4)(2,175)(1,352)(387)(787)(164)(14)(299)299(823)(213)(352)(113)—(145)——
Ore reserve development(2,954)(772)(772)—(2,182)(832)(315)(516)———(1)(1,350)(614)(489)(247)————
Growth projects(1,731)(1,194)(1,194)—(537)(197)—(197)————(340)—(107)(7)—(38)(188)—
Total capital expenditure(7,154)(2,260)(2,256)(4)(4,894)(2,381)(702)(1,500)(164)(14)(299)298(2,513)(827)(948)(367)—(183)(188)—
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 47


For the six months ended 31 Dec 2021 (Unaudited)
GROUPUS PGM OPERATIONSSA OPERATIONSGROUP
US dollars5
TotalTotal US PGMUndergroundRecyclingTotal SA
Operations
Total
SA PGM
Rusten-
burg
MarikanaKroondalPlatinum
Mile
Mimosa
Corporate
and re-
conciling
items1
Total
SA gold
Drie-
fontein
KloofBeatrixCookeDRD-
GOLD
Corporate
and re-
conciling
items1
Cor-
porate1
Revenue5,4611,9915721,4193,4792,4769101,27624150110(111)1,00328331720532166—(9)
Underground3,662572572—3,0992,3468301,276241—110(111)753270286197———(9)
Surface380———38013080——50——2501331832166——
Recycling1,4191,419—1,419————————————————
Cost of sales, before amortisation and depreciation(3,521)(1,650)(282)(1,368)(1,871)(1,089)(397)(553)(119)(20)(54)54(782)(203)(263)(172)(28)(116)——
Underground(1,919)(282)(282)—(1,637)(1,034)(362)(553)(119)—(54)54(603)(195)(241)(167)————
Surface(234)———(234)(55)(35)——(20)——(179)(8)(22)(5)(28)(116)——
Recycling(1,368)(1,368)—(1,368)————————————————
Net other cash costs2
(88)———(88)(51)7(37)(3)(16)(1)(1)(37)(3)(4)(3)(20)(2)(5)—
Adjusted EBITDA1,852341290511,5201,3365206861191455(58)184775030(16)48(5)(9)
Amortisation and depreciation(300)(96)(96)—(204)(88)(31)(39)(18)(1)(10)11(116)(45)(36)(25)(1)(7)(2)—
Interest income3811110268—33—1118211—771
Finance expense(82)(31)(30)(1)(41)(22)(148)(13)(4)——143(19)(4)(3)(3)(2)(2)(5)(10)
Share-based payments(6)(1)(1)—(5)(2)—————(2)(3)—————(3)—
Net other3
(208)3838—(249)(335)(828)(42)243(3)51186——161783
Non-underlying items4
(372)(16)(16)—(350)———————(350)(15)(249)(87)——1(6)
Royalties and carbon tax(71)———(71)(65)(34)(30)——(4)3(6)(3)(1)(1)——(1)—
Profit before tax85124618660626832(521)5651241639609(206)12(238)(84)(13)4770(21)
Current taxation(375)(38)(336)(325)(115)(166)(36)(9)(10)11(11)(1)(1)——(10)1(1)
Deferred taxation68(10)786867(7)24—21097815—(3)(89)—
Profit/(loss) for the period544198368575(569)392901129622(207)20(161)(69)(13)34(18)(22)
Attributable to:
Owners of the parent527198351576(569)392901329621(225)20(161)(69)(13)16(18)(22)
Non-controlling interest holders17—17(1)———(2)—118————18——
Sustaining capital expenditure(165)(19)(19)—(146)(91)(26)(53)(11)(1)(20)20(55)(15)(24)(7)—(9)——
Ore reserve development(198)(52)(52)—(146)(55)(21)(34)————(91)(41)(33)(17)————
Growth projects(115)(79)(79)—(36)(14)—(14)————(22)—(7)——(2)(13)—
Total capital expenditure(478)(150)(150)—(328)(160)(47)(101)(11)(1)(20)20(168)(56)(64)(24)—(11)(13)—
1Corporate and reconciling items represent the items to reconcile segment data to condensed consolidated financial statement totals. This does not represent a separate segment as it does not generate revenue. Group corporate includes the Wheaton Stream transaction, initial recognition of battery metal investment, corporate taxation, interest and corporate transaction costs
2Net other cash costs consist of service entity and sundry income (R288 million), and other costs as detailed in profit or loss, excluding non-cash loss due to dilution of interest in joint operation (R2 million), and include lease payments (R71 million) to conform with the adjusted EBITDA reconciliation disclosed in note 11.1
3Net other consists of gain on financial instruments, loss on foreign exchange differences as detailed in profit or loss, change in estimate of environmental rehabilitation obligation, and right of recovery receivable and payable (income of R162 million) and the add back of the lease payment referred to in footnote 2 above. Corporate and reconciling items net other includes the share of results of equity-accounted investees after tax as detailed in profit or loss
4Non-underlying items consists of gain on disposal of property, plant and equipment, impairments which include impairment to mining assets of Driefontein, Kloof and Beatrix of R212 million, R3,642 million and R1,293 million, respectively, restructuring costs, transaction costs and early redemption premium on the 2022 and 2025 Notes as detailed in profit or loss and also includes non-cash loss with dilution of interest in joint operation (R2 million), profit on sale of St Helena Hospital (R16 million) and occupational healthcare expense as detailed in profit or loss
5The average exchange rate for the six months ended 31 December 2021 was R15.03/US$


Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 48




Figures are in millions
For the year ended 31 Dec 2022 (Unaudited)
GROUPUS PGM OPERATIONSSA OPERATIONSEuropeGROUP
SA randTotalTotal US PGMUndergroundRecyclingTotal SA
Operations
Total
SA PGM
Rusten-
burg
MarikanaKroondalPlatinum
Mile
Mimosa
Corporate
and re-
conciling
items1
Total
SA gold
Drie-
fontein
KloofBeatrixCookeDRD-
GOLD
Corporate
and re-
conciling
items1
Total
Battery Metals
Sandouville2
Corporate
and re-
conciling
items1,3
Cor-
porate1
Revenue138,28846,09013,82332,26789,50771,66529,10432,7538,3711,4374,267(4,267)17,8424,4864,4862,6819155,274—3,1403,140—(449)
Underground92,32513,82313,823—78,95168,18227,05832,7538,371—4,267(4,267)10,7694,2133,9242,632——————(449)
Surface10,556———10,5563,4832,046——1,437——7,073273562499155,274—————
Recycling/processing35,40732,267—32,267———————————————3,1403,140——
Cost of sales, before amortisation and depreciation(94,537)(38,452)(7,459)(30,993)(52,454)(32,280)(13,546)(14,603)(3,548)(583)(1,936)1,936(20,174)(5,281)(6,381)(3,910)(822)(3,780)—(3,631)(3,631)——
Underground(52,734)(7,459)(7,459)—(45,275)(30,528)(12,377)(14,603)(3,548)—(1,936)1,936(14,747)(5,085)(5,821)(3,841)———————
Surface(7,179)———(7,179)(1,752)(1,169)——(583)——(5,427)(196)(560)(69)(822)(3,780)—————
Recycling/processing(34,624)(30,993)—(30,993)———————————————(3,631)(3,631)——
Net other cash costs4
(2,640)(34)(34)—(2,464)(1,250)151(688)(128)(407)(21)(157)(1,214)(173)(167)(123)(717)40(74)(87)(1)(86)(55)
Adjusted EBITDA41,1117,6046,3301,27434,58938,13515,70917,4624,6954472,310(2,488)(3,546)(968)(2,062)(1,352)(624)1,534(74)(578)(492)(86)(504)
Amortisation and depreciation(7,087)(2,803)(2,799)(4)(4,126)(2,418)(981)(1,205)(180)(40)(342)330(1,708)(721)(469)(305)(3)(176)(34)(158)(153)(5)—
Interest income1,203309812288934024321410930102(96)4916857353526531———1
Finance expense(2,840)(952)(952)—(1,547)(831)(4,618)(320)(111)—(36)4,254(716)(100)(95)(95)(86)(78)(262)(15)(13)(2)(326)
Share-based payments(218)(47)(47)—(169)(73)(27)(36)(9)(1)——(96)(20)(15)(10)—(19)(32)———(2)
Net other5
(2,142)(243)(243)—(2,055)(2,025)(9,353)(1,599)3035(499)9,118(30)132634(50)28(81)111238845
Non-underlying items6
(299)(5)(5)—(153)(132)10(136)(4)—(1)(1)(21)10(14)(281)(2)10256———(141)
Royalties and carbon tax(1,824)———(1,824)(1,772)(1,023)(735)(13)—(127)126(52)(22)(22)(3)(5)——————
Profit before tax27,9043,8632,3651,49825,60831,286(240)13,6454,7904411,40711,243(5,678)(1,740)(2,594)(1,977)(735)1,564(196)(640)(635)(5)(927)
Current taxation(9,282)(655)(8,623)(8,373)(3,169)(3,766)(1,288)(130)(208)188(250)(6)(3)——(226)(15)———(4)
Deferred taxation35831582(1,332)(590)(693)(60)8(138)1411,41484(184)154—(125)1,485(39)—(39)—
Profit/(loss) for the year18,9803,52317,06721,581(3,999)9,1863,4423191,06111,572(4,514)(1,662)(2,781)(1,823)(735)1,2131,274(679)(635)(44)(931)
Attributable to:
Owners of the parent18,3963,52316,46921,577(3,999)9,1823,4423191,06111,572(5,108)(1,662)(2,781)(1,823)(735)6121,281(665)(635)(30)(931)
Non-controlling interest holders584—5984—4————594————601(7)(14)—(14)—
Sustaining capital expenditure(4,946)(1,185)(1,184)(1)(3,671)(2,056)(690)(1,072)(273)(21)(864)864(1,615)(358)(455)(155)—(647)—(90)(90)——
Ore reserve development(6,640)(2,887)(2,887)—(3,753)(2,123)(687)(1,436)————(1,630)(794)(620)(216)———————
Growth projects(4,313)(1,345)(1,345)—(2,239)(925)—(924)———(1)(1,314)—(210)(4)—(124)(976)(729)—(729)—
Total capital expenditure(15,899)(5,417)(5,416)(1)(9,663)(5,104)(1,377)(3,432)(273)(21)(864)863(4,559)(1,152)(1,285)(375)—(771)(976)(819)(90)(729)—
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 49


For the year ended 31 Dec 2022 (Unaudited)
GROUPUS PGM OPERATIONSSA OPERATIONSEuropeGROUP
US dollars7
TotalTotal US PGMUndergroundRecyclingTotal SA
Operations
Total
SA PGM
Rusten-
burg
MarikanaKroondalPlatinum
Mile
Mimosa
Corporate
and re-
conciling
items1
Total
SA gold
Drie-
fontein
KloofBeatrixCookeDRD-
GOLD
Corporate
and re-
conciling
items1
Total
Battery Metals
Sandouville2
Corporate
and re-
conciling
items1,3
Cor-
porate1
Revenue8,4482,8158441,9715,4684,3781,7782,00151188261(261)1,09027427416456322—192192—(27)
Underground5,640844844—4,8234,1651,6532,001511—261(261)658257240161——————(27)
Surface645———645213125——88——4321734356322—————
Recycling/processing2,1631,971—1,971———————————————192192——
Cost of sales, before amortisation and depreciation(5,775)(2,349)(456)(1,893)(3,204)(1,971)(827)(892)(217)(36)(118)119(1,233)(323)(390)(239)(50)(231)—(222)(222)——
Underground(3,222)(456)(456)—(2,766)(1,864)(756)(892)(217)—(118)119(902)(311)(356)(235)———————
Surface(438)———(438)(107)(71)——(36)——(331)(12)(34)(4)(50)(231)—————
Recycling/processing(2,115)(1,893)—(1,893)———————————————(222)(222)——
Net other cash costs4
(163)(2)(2)—(153)(77)9(42)(8)(25)(1)(10)(76)(11)(10)(8)(44)2(5)(5)—(5)(3)
Adjusted EBITDA2,510464386782,1112,3309601,06728627142(152)(219)(60)(126)(83)(38)93(5)(35)(30)(5)(30)
Amortisation and depreciation(433)(171)(171)—(253)(148)(60)(74)(11)(2)(21)20(105)(44)(29)(19)—(11)(2)(9)(9)——
Interest income73195145425313726(6)294322162————
Finance expense(173)(58)(58)—(94)(50)(282)(20)(7)—(2)261(44)(6)(6)(6)(5)(5)(16)(1)(1)—(20)
Share-based payments(13)(3)(3)—(10)(4)(2)(2)(1)——1(6)(1)(1)(1)—(1)(2)————
Net other5
(130)(15)(15)—(124)(123)(571)(98)19—(30)557(1)122(3)2(5)6153
Non-underlying items6
(16)———(7)(7)1(8)—————1(1)(17)—116———(9)
Royalties and carbon tax(111)———(111)(109)(62)(45)(1)—(8)7(2)(1)(1)————————
Profit before tax1,707236144921,5661,914(13)8332922787688(348)(106)(159)(122)(44)95(12)(39)(39)—(56)
Current taxation(567)(40)(527)(512)(194)(230)(79)(8)(13)12(15)————(14)(1)————
Deferred taxation22195(81)(36)(42)(4)—(8)9865(11)9—(8)91(2)—(2)—
Profit/(loss) for the year1,1622151,0441,321(243)5612091966709(277)(101)(170)(113)(44)7378(41)(39)(2)(56)
Attributable to:
Owners of the parent1,1262151,0071,321(243)5612091966709(314)(101)(170)(113)(44)3678(40)(39)(1)(56)
Non-controlling interest holders36—37———————37————37—(1)—(1)—
Sustaining capital expenditure(301)(72)(72)—(224)(125)(42)(65)(17)(1)(53)53(99)(22)(28)(9)—(40)—(5)(5)——
Ore reserve development(406)(176)(176)—(230)(130)(42)(88)————(100)(49)(38)(13)———————
Growth projects(264)(82)(82)—(137)(56)—(56)————(81)—(13)——(8)(60)(45)—(45)—
Total capital expenditure(971)(330)(330)—(591)(311)(84)(209)(17)(1)(53)53(280)(71)(79)(22)—(48)(60)(50)(5)(45)—
1Corporate and reconciling items represent the items to reconcile segment data to condensed consolidated financial statement totals. This does not represent a separate segment as it does not generate revenue. Group corporate includes the Wheaton Stream transaction and corporate transaction costs
2The Battery Metals results for the year ended 31 December 2022 includes the results of Sandouville for the eleven months since acquisition (refer note 10.2)
3Corporate and reconciling items for Battery Metals includes a net loss of R143 million for Keliber since the effective date of acquisition (refer note 10.1)
4Net other cash costs consist of service entity and sundry income (R893 million) and other costs as detailed in profit or loss, excluding the loss on deconsolidation of the Bapo Trust (R309 million) and include lease payments (R163 million) to conform with the adjusted EBITDA reconciliation disclosed in note 11.1
5Net other consists of loss on financial instruments, loss on foreign exchange differences as detailed in profit or loss, change in estimate of environmental rehabilitation obligation, and right of recovery receivable and payable (income of R71 million) and the add back of the lease payment referred to in footnote 4 above. Corporate and reconciling items net other includes the share of results of equity-accounted investees after tax as detailed in profit or loss
6Non-underlying items consists of gain on disposal of property, plant and equipment, reversal of impairments, restructuring costs and transaction costs as detailed in profit or loss and also includes non-cash gain on deregistration of subsidiary in the Group (R1 million), profit on sale of Lonmin Canada (R145 million), loss on deconsolidation of the Bapo Trust (R309 million) and occupational healthcare income as detailed in profit or loss
7The average exchange rate for the year ended 31 December 2022 was R16.37/US$

Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 50




Figures are in millions
For the year ended 31 Dec 2021 (Unaudited)
GROUPUS PGM OPERATIONSSA OPERATIONSGROUP
SA randTotalTotal US PGMUndergroundRecyclingTotal SA
Operations
Total
SA PGM
Rusten-
burg
MarikanaKroondalPlatinum
Mile
Mimosa
Corporate
and re-
conciling
items1
Total
SA gold
Drie-
fontein
KloofBeatrixCookeDRD-
GOLD
Corporate
and re-
conciling
items1
Cor-
porate1
Revenue172,19459,05318,34340,710113,51285,15431,74941,61010,2931,5034,393(4,394)28,3587,9329,2945,3439994,790—(371)
Underground120,40318,34318,343—102,43181,47729,57541,61010,293—4,393(4,394)20,9547,7228,0895,143———(371)
Surface11,081———11,0813,6772,174——1,503——7,4042101,2052009994,790——
Recycling40,71040,710—40,710————————————————
Cost of sales, before amortisation and depreciation(101,013)(46,787)(7,567)(39,220)(54,226)(31,971)(11,464)(16,561)(3,416)(531)(1,587)1,588(22,255)(5,691)(7,844)(4,565)(808)(3,347)——
Underground(54,989)(7,567)(7,567)—(47,422)(30,430)(10,454)(16,561)(3,416)—(1,587)1,588(16,992)(5,559)(6,986)(4,447)————
Surface(6,804)———(6,804)(1,541)(1,010)——(531)——(5,263)(132)(858)(118)(808)(3,347)——
Recycling(39,220)(39,220)—(39,220)————————————————
Net other cash costs2
(2,575)(10)(10)—(2,565)(1,575)134(1,036)(91)(492)(42)(48)(990)(78)(83)(73)(611)(40)(105)—
Adjusted EBITDA68,60612,25610,7661,49056,72151,60820,41924,0136,7864802,764(2,854)5,1132,1631,367705(420)1,403(105)(371)
Amortisation and depreciation(8,293)(2,601)(2,598)(3)(5,692)(2,515)(885)(1,099)(495)(31)(274)269(3,177)(1,165)(1,064)(691)(11)(188)(58)—
Interest income1,20238210372805219229297712(11)5866047312222220415
Finance expense(2,496)(954)(897)(57)(1,233)(666)(4,201)(328)(116)—(5)3,984(567)(99)(85)(82)(63)(60)(178)(309)
Share-based payments(383)(73)(73)—(310)(89)(35)(42)(12)———(221)(20)(32)(21)—(19)(129)—
Net other3
(2,832)238238—(3,121)(4,305)(12,232)(985)24834(43)8,6731,184162233922299951
Non-underlying items4
(5,529)(278)(278)—(5,153)24(1)(1)———(5,155)(202)(3,686)(1,290)(3)—26(98)
Royalties and carbon tax(2,718)———(2,718)(2,548)(1,405)(1,129)(14)—(160)160(170)(95)(46)(29)(5)—5—
Profit before tax47,5578,9707,1681,80239,29941,7061,68720,5216,4934902,29410,221(2,407)658(3,477)(1,344)(388)1,380764(712)
Current taxation(13,506)(1,422)(12,014)(11,745)(4,864)(4,768)(1,885)(218)(574)564(269)(13)(13)(7)—(263)27(70)
Deferred taxation(255)(89)(166)(367)956(1,460)5680(18)19201491,158233—(77)(1,162)—
Profit/(loss) for the year33,7967,45927,11929,594(2,221)14,2934,6643521,70210,804(2,475)694(2,332)(1,118)(388)1,040(371)(782)
Attributable to:
Owners of the parent33,0547,45926,37729,360(2,221)14,0754,6643361,70210,804(2,983)694(2,332)(1,118)(388)527(366)(782)
Non-controlling interest holders742—742234—218—16——508————513(5)—
Sustaining capital expenditure(4,119)(796)(791)(5)(3,323)(2,019)(619)(1,104)(268)(28)(499)499(1,304)(322)(488)(164)—(330)——
Ore reserve development(5,535)(1,354)(1,354)—(4,181)(1,577)(629)(947)———(1)(2,604)(1,177)(930)(497)————
Growth projects(3,086)(2,411)(2,411)—(675)(203)—(203)————(472)—(198)(7)—(47)(220)—
Total capital expenditure(12,740)(4,561)(4,556)(5)(8,179)(3,799)(1,248)(2,254)(268)(28)(499)498(4,380)(1,499)(1,616)(668)—(377)(220)—
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 51


For the year ended 31 Dec 2021 (Unaudited)
GROUPUS PGM OPERATIONSSA OPERATIONSGROUP
US dollars5
TotalTotal US PGMUndergroundRecyclingTotal SA
Operations
Total
SA PGM
Rusten-
burg
MarikanaKroondalPlatinum
Mile
Mimosa
Corporate
and re-
conciling
items1
Total
SA gold
Drie-
fontein
KloofBeatrixCookeDRD-
GOLD
Corporate
and re-
conciling
items1
Cor-
porate1
Revenue11,6433,9931,2402,7537,6755,7572,1472,813696102297(298)1,91853662836268324—(25)
Underground8,1401,2401,240—6,9255,5082,0002,813696—297(298)1,417522547348———(25)
Surface750———750249147——102——50114811468324——
Recycling2,7532,753—2,753————————————————
Cost of sales, before amortisation and depreciation(6,830)(3,164)(512)(2,652)(3,666)(2,161)(775)(1,119)(231)(36)(107)107(1,505)(385)(530)(309)(55)(226)——
Underground(3,718)(512)(512)—(3,206)(2,057)(707)(1,119)(231)—(107)107(1,149)(376)(472)(301)————
Surface(460)———(460)(104)(68)——(36)——(356)(9)(58)(8)(55)(226)——
Recycling(2,652)(2,652)—(2,652)————————————————
Net other cash costs2
(174)(1)(1)—(173)(106)9(70)(6)(33)(3)(3)(67)(5)(6)(5)(41)(3)(7)—
Adjusted EBITDA4,6398287271013,8363,4901,3811,62445933187(194)3461469248(28)95(7)(25)
Amortisation and depreciation(561)(176)(176)—(385)(169)(60)(74)(33)(2)(19)19(216)(79)(72)(47)(1)(13)(4)—
Interest income81261255415167—1—39432115141
Finance expense(169)(65)(61)(4)(83)(44)(284)(22)(8)——270(39)(7)(6)(6)(4)(4)(12)(21)
Share-based payments(26)(5)(5)—(21)(7)(2)(3)(1)——(1)(14)(1)(2)(1)—(1)(9)—
Net other3
(192)1616—(211)(290)(827)(67)172(3)5887911261683
Non-underlying items4
(374)(19)(19)—(348)———————(348)(14)(249)(87)——2(7)
Royalties and carbon tax(184)———(184)(173)(95)(76)(1)—(11)10(11)(6)(3)(2)————
Profit before tax3,2146054831222,6582,8221141,38844033155692(164)44(236)(91)(26)9352(49)
Current taxation(913)(96)(812)(794)(329)(322)(127)(15)(39)38(18)(1)(1)——(18)2(5)
Deferred taxation(17)(6)(11)(24)65(99)45(1)21337816—(5)(79)—
Profit/(loss) for the year2,2845031,8352,004(150)96731723115732(169)46(159)(75)(26)70(25)(54)
Attributable to:
Owners of the parent2,2345031,7851,989(150)95231723115732(204)46(159)(75)(26)35(25)(54)
Non-controlling interest holders50—5015—15————35————35——
Sustaining capital expenditure5
(278)(53)(53)—(225)(137)(42)(75)(18)(2)(34)34(88)(22)(33)(11)—(22)——
Ore reserve development(376)(92)(92)—(284)(107)(43)(64)————(177)(80)(63)(34)————
Growth projects(208)(163)(163)—(45)(14)—(14)————(31)—(13)——(3)(15)—
Total capital expenditure(862)(308)(308)—(554)(258)(85)(153)(18)(2)(34)34(296)(102)(109)(45)—(25)(15)—
1Corporate and reconciling items represent the items to reconcile segment data to condensed consolidated financial statement totals. This does not represent a separate segment as it does not generate revenue. Group corporate includes the Wheaton Stream transaction, initial recognition of battery metal investment, corporate taxation, interest and corporate transaction costs
2Net other cash costs consist of service entity and sundry income of R581 million and other costs as detailed in profit or loss, excluding non-cash loss due to dilution of interest in joint operation (R4 million), and include lease payments (R142 million) to conform with the adjusted EBITDA reconciliation disclosed in note 11.1
3Net other consists of gain on financial instruments, loss on foreign exchange differences as detailed in profit or loss, change in estimate of environmental rehabilitation obligation, and right of recovery receivable and payable (R167 million) and the add back of the lease payment referred to in footnote 2 above. Corporate and reconciling items net other includes the share of results of equity-accounted investees after tax as detailed in profit or loss
4Non-underlying items consists of gain on disposal of property, plant and equipment, impairments which include impairment to mining assets of Driefontein, Kloof and Beatrix of R212 million, R3,642 million and R1,293 million, respectively), restructuring costs, transaction costs and early redemption premium on the 2022 and 2025 Notes as detailed in profit or loss and also includes non-cash loss with dilution of interest in joint operation (R4 million), profit on sale of St Helena Hospital (R16 million) and occupational healthcare gain as detailed in profit or loss
5The average exchange rate for the year ended 31 December 2021 was R14.79/US$




Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 52


ALL-IN COSTS - SIX MONTHS
US and SA PGM operations    
US
OPERATIONS
SA OPERATIONS
R' million
Total US and SA PGM1
Total US PGM2
Total SA PGM1
Rustenburg
Marikana1
KroondalPlat MileMimosaCorporate
Cost of sales, before amortisation and depreciation3
Dec 202219,117 3,616 15,501 6,888 6,530 1,774 309 1,046 (1,046)
Jun 202220,623 3,842 16,781 6,659 8,073 1,774 275 890 (890)
Dec 202120,583 4,216 16,367 5,952 8,328 1,785 302 813 (813)
RoyaltiesDec 2022817 — 817 565 245 7 — 57 (57)
Jun 2022953 — 953 458 488 7 — 70 (70)
Dec 2021975 — 975 512 458 5 — 65 (65)
Carbon taxDec 2022(1)— (1)— — (1)— — — 
Jun 2022— — — (1)1 — — — — 
Dec 2021— — — — — — — — — 
Community costsDec 202249 — 49 — 49 — — — — 
Jun 202295 — 95 — 95 — — — — 
Dec 202187 — 87 6 81 — — — — 
Inventory changeDec 20223,106 439 2,667 347 2,320 — — 2 (2)
Jun 2022(385)(34)(351)(245)(106)— — (17)17 
Dec 202198 (446)544 573 (29)— — 20 (20)
Share-based payments4
Dec 2022133 56 77 30 42 5 — — — 
Jun 2022182 81 101 37 45 17 1 — — 
Dec 202197 40 57 23 27 7 — — — 
Rehabilitation interest and amortisation5
Dec 202286 28 58 (13)26 45 — 3 (3)
Jun 2022105 24 81 2 40 39 — 12 (12)
Dec 2021143 16 127 — 81 46 — 2 (2)
LeasesDec 202231 4 27 6 19 2 — — — 
Jun 202232 3 29 6 19 4 — — — 
Dec 202129 1 28 5 19 4 — — — 
Ore reserve developmentDec 20222,793 1,610 1,183 371 812 — — — — 
Jun 20222,216 1,277 939 315 624 — — — — 
Dec 20211,603 772 831 315 516 — — — — 
Sustaining capital expenditureDec 20222,046 806 1,240 385 681 158 16 570 (570)
Jun 20221,195 378 817 305 391 115 6 294 (294)
Dec 20211,642 290 1,352 386 787 165 14 299 (299)
Less: By-product creditDec 2022(4,545)(467)(4,078)(1,867)(1,797)(369)(45)(368)368 
Jun 2022(5,292)(732)(4,560)(1,727)(2,347)(449)(37)(384)384 
Dec 2021(4,943)(639)(4,304)(1,296)(2,497)(455)(56)(271)271 
Total All-in-sustaining costs6
Dec 202223,632 6,092 17,540 6,712 8,927 1,621 280 1,310 (1,310)
Jun 202219,724 4,839 14,885 5,809 7,323 1,507 245 865 (865)
Dec 202120,314 4,250 16,064 6,476 7,771 1,557 260 928 (928)
Plus: Corporate cost, growth and capital expenditureDec 20221,337 814 523 — 523 — — — — 
Jun 2022943 530 413 — 413 — — — — 
Dec 20211,400 1,194 206 — 206 — — — — 
Total All-in-costs6
Dec 202224,969 6,906 18,063 6,712 9,450 1,621 280 1,310 (1,310)
Jun 202220,667 5,369 15,298 5,809 7,736 1,507 245 865 (865)
Dec 202121,714 5,444 16,270 6,476 7,977 1,557 260 928 (928)
PGM production4Eoz - 2EozDec 20221,072,750 191,094 881,656 324,025 375,652 100,441 23,558 57,980 — 
Jun 20221,079,191 230,039 849,152 304,872 360,609 101,315 24,802 57,554 — 
Dec 20211,239,777 272,099 967,678 343,820 421,632 113,035 30,654 58,537 — 
kgDec 202233,366 5,944 27,423 10,078 11,684 3,124 733 1,803 — 
Jun 202233,567 7,155 26,412 9,483 11,216 3,151 771 1,790 — 
Dec 202138,561 8,463 30,098 10,694 13,114 3,516 953 1,821 — 
All-in-sustaining costR/4Eoz - R/2EozDec 202223,288 31,880 21,295 20,714 23,764 16,139 11,886 22,594 — 
Jun 202219,306 21,036 18,804 19,054 20,307 14,874 9,878 15,029 — 
Dec 202117,197 15,619 17,669 18,835 18,431 13,774 8,482 15,853 — 
US$/4Eoz - US$/2EozDec 20221,344 1,840 1,229 1,195 1,371 931 686 1,304 — 
Jun 20221,254 1,366 1,221 1,237 1,319 966 641 976 — 
Dec 20211,144 1,039 1,176 1,253 1,226 916 564 1,055 — 
All-in-costR/4Eoz - R/2EozDec 202224,606 36,139 21,930 20,714 25,156 16,139 11,886 22,594 — 
Jun 202220,229 23,340 19,325 19,054 21,453 14,874 9,878 15,029 — 
Dec 202118,382 20,007 17,896 18,835 18,919 13,774 8,482 15,853 — 
US$/4Eoz - US$/2EozDec 20221,420 2,085 1,265 1,195 1,452 931 686 1,304 — 
Jun 20221,314 1,516 1,255 1,237 1,393 966 641 976 — 
Dec 20211,223 1,331 1,191 1,253 1,259 916 564 1,055 — 
Average exchange rate for the six months ended 31 December 2022, 30 June 2022 and 31 December 2021 was R17.33/US$, R15.40/US$ and R15.03/US$, respectively
Figures may not add as they are rounded independently
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 53


1The Total US and SA PGM, Total SA PGM and Marikana includes the production and costs associated with the purchase of concentrate (PoC) from third parties. For a reconciliation of the Operating cost, AISC and AIC excluding third party PoC, refer to “Reconciliation of operating cost excluding third party PoC for Total US and SA PGM, Total SA PGM and Marikana - Six Months” and “Reconciliation of AISC and AIC excluding third party PoC for Total US and SA PGM, Total SA PGM and Marikana – Six Months”
2The US PGM operations’ underground production is converted to metric tonnes and kilograms, and performance is translated into SA rand. In addition to the US PGM operations’ underground production, the operation processes various recycling material which is excluded from the 2E PGM production, All-in sustaining cost and All-in cost statistics shown
3Cost of sales, before amortisation and depreciation includes all mining and processing costs, third party refining costs, corporate general and administrative costs, and permitting costs
4Share-based payments are calculated based on the fair value at initial recognition and do not include the adjustment of the cash-settled share-based payment obligation to the reporting date fair value
5Rehabilitation includes the interest charge related to the environmental rehabilitation obligation and the amortisation of the related capitalised rehabilitation costs. The interest charge related to the environmental rehabilitation obligation and the amortisation of the capitalised rehabilitation costs reflect the periodic costs of rehabilitation associated with current PGM production
6All-in cost is calculated in accordance with the World Gold Council guidance. All-in cost excludes income tax, costs associated with merger and acquisition activities, working capital, impairments, financing costs, one-time severance charges and items needed to normalise earnings. All-in cost is made up of All-in sustaining cost, being the cost to sustain current operations, given as a sub-total in the All-in cost calculation, together with corporate and major capital expenditure associated with growth. All-in sustaining cost per ounce (and kilogram) and All-in cost per ounce (and kilogram) are calculated by dividing the All-in sustaining cost and All-in cost, respectively, in a period by the total 4E/2E PGM produced in the same period


Reconciliation of operating cost excluding third party PoC for Total US and SA PGM, Total SA PGM and Marikana - Six Months
Total US and SA PGMTotal SA PGMMarikana
R' millionDec 2022Jun 2022Dec 2021Dec 2022Jun 2022Dec 2021Dec 2022Jun 2022Dec 2021
Cost of sales, before amortisation and depreciation as reported per table above19,117 20,623 20,583 15,501 16,781 16,367 6,530 8,073 8,328 
Inventory change as reported per table above3,106 (385)98 2,667 (351)544 2,320 (106)(29)
Less: Chrome cost of sales(753)(776)(721)(753)(776)(721)(164)(212)(156)
Total operating cost including third party PoC21,470 19,462 19,960 17,415 15,654 16,190 8,686 7,755 8,143 
Less: Purchase cost of PoC(1,638)(1,100)(1,122)(1,638)(1,100)(1,122)(1,638)(1,100)(1,122)
Total operating cost excluding third party PoC19,832 18,362 18,838 15,777 14,554 15,068 7,048 6,655 7,021 
PGM production as reported per table above4Eoz- 2Eoz1,072,750 1,079,191 1,239,777 881,656 849,152 967,678 375,652 360,609 421,632 
Less: Mimosa production (57,980)(57,554)(58,537)(57,980)(57,554)(58,537)— — — 
PGM production excluding Mimosa1,014,770 1,021,637 1,181,240 823,676 791,598 909,141 375,652 360,609 421,632 
Less: PoC production(37,998)(25,346)(25,705)(37,998)(25,346)(25,705)(37,998)(25,346)(25,705)
PGM production excluding Mimosa and third party PoC976,772 996,291 1,155,535 785,678 766,252 883,436 337,654 335,263 395,927 
PGM production including Mimosa and excluding third party PoC1,034,752 1,053,845 1,214,072 843,658 823,806 941,973 337,654 335,263 395,927 
Tonnes milled/treated000't18,867 18,932 20,361 18,339 18,305 19,651 4,993 5,020 5,542 
Less: Mimosa tonnes(687)(700)(708)(687)(700)(708)— — — 
PGM tonnes excluding Mimosa and third party PoC18,179 18,232 19,653 17,652 17,605 18,943 4,993 5,020 5,542 
Operating cost including third party PoCR/4Eoz-R/2Eoz21,158 19,050 16,897 21,143 19,775 17,808 23,122 21,505 19,313 
US$/4Eoz-US$/2Eoz1,221 1,237 1,124 1,220 1,284 1,185 1,334 1,396 1,285 
R/t1,181 1,067 1,016 987 889 855 1,739 1,545 1,469 
US$/t68 69 68 57 58 57 100 100 98 
Operating cost excluding third party PoCR/4Eoz-R/2Eoz20,304 18,430 16,302 20,081 18,994 17,056 20,873 19,850 17,733 
US$/4Eoz-US$/2Eoz1,172 1,197 1,085 1,159 1,233 1,135 1,204 1,289 1,180 
R/t1,091 1,007 959 894 827 795 1,411 1,326 1,267 
US$/t63 65 64 52 54 53 81 86 84 

Reconciliation of AISC and AIC excluding third party PoC for Total US and SA PGM, Total SA PGM and Marikana - Six Months
Total US and SA PGMTotal SA PGMMarikana
R' millionDec 2022Jun 2022Dec 2021Dec 2022Jun 2022Dec 2021Dec 2022Jun 2022Dec 2021
Total All-in-sustaining cost as reported per table above23,632 19,724 20,314 17,540 14,885 16,064 8,927 7,323 7,771 
Less: Purchase cost of PoC(1,638)(1,100)(1,122)(1,638)(1,100)(1,122)(1,638)(1,100)(1,122)
Add: By-product credit of PoC150 130 109 150 130 109 150 130 109 
Total All-in-sustaining cost excluding third party PoC22,144 18,754 19,301 16,052 13,915 15,051 7,439 6,353 6,758 
Plus: Corporate cost, growth and capital expenditure1,337 943 1,400 523 413 206 523 413 206 
Total All-in-cost excluding third party PoC23,481 19,697 20,701 16,575 14,328 15,257 7,962 6,766 6,964 
PGM production excluding Mimosa and third party PoC4Eoz- 2Eoz976,772 996,291 1,155,535 785,678 766,252 883,436 337,654 335,263 395,927 
All-in-sustaining cost excluding third party PoCR/4Eoz-R/2Eoz22,671 18,824 16,703 20,431 18,160 17,037 22,031 18,949 17,069 
US$/4Eoz-US$/2Eoz1,308 1,222 1,111 1,179 1,179 1,134 1,271 1,230 1,136 
All-in-cost excluding third party PoCR/4Eoz-R/2Eoz24,039 19,770 17,915 21,096 18,699 17,270 23,580 20,181 17,589 
US$/4Eoz-US$/2Eoz1,387 1,284 1,192 1,217 1,214 1,149 1,361 1,310 1,170 
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 54


SA gold operations
SA OPERATIONS
R' millionTotal SA goldDriefonteinKloofBeatrixCookeDRDGOLDCorporate
Cost of sales, before amortisation and depreciation1
Dec 202211,616 2,989 3,565 2,629 496 1,937 — 
Jun 20228,557 2,292 2,816 1,281 326 1,842 — 
Dec 202111,739 3,056 3,962 2,560 409 1,752 — 
RoyaltiesDec 202246 15 16 12 3 — — 
Jun 202217 7 7 1 2 — — 
Dec 202196 49 24 15 2 — 6 
Carbon taxDec 20221 — — 1 — — — 
Jun 2022(11)— — (11)— — — 
Dec 20211 — — 1 — — — 
Community costsDec 202227 8 7 6 — 6 — 
Jun 202266 24 20 17 — 5 — 
Dec 202165 23 19 17 1 5 — 
Share-based payments2
Dec 202276 24 25 17 — 10 — 
Jun 202270 25 22 14 — 9 — 
Dec 202151 12 17 12 — 10 — 
Rehabilitation interest and amortisation3
Dec 202271 (4)(14)30 26 8 25 
Jun 202269 17 (2)20 24 7 3 
Dec 202196 11 7 33 31 10 4 
LeasesDec 202239 3 9 15 1 11 — 
Jun 202242 2 9 14 3 14 — 
Dec 202139 4 5 14 6 10 — 
Ore reserve developmentDec 20221,163 542 436 185 — — — 
Jun 2022468 252 185 31 — — — 
Dec 20211,352 615 489 248 — — — 
Sustaining capital expenditureDec 2022889 263 303 87 — 236 — 
Jun 2022725 95 152 68 — 410 — 
Dec 2021822 213 351 113 — 145 — 
Less: By-product creditDec 2022(6)(2)(2)(2)— — — 
Jun 2022(7)(1)(1)— — (5)— 
Dec 2021(14)(4)(3)(3)(1)(3)— 
Total All-in-sustaining costs4
Dec 202213,922 3,838 4,345 2,980 526 2,208 25 
Jun 20229,996 2,713 3,208 1,435 355 2,282 3 
Dec 202114,247 3,979 4,871 3,010 448 1,929 10 
Plus: Corporate cost, growth and capital expenditureDec 2022940 — 155 — — 118 667 
Jun 2022439 — 54 4 — 6 375 
Dec 2021390 — 107 7 — 38 238 
Total All-in-costs4
Dec 202214,862 3,838 4,500 2,980 526 2,326 692 
Jun 202210,435 2,713 3,262 1,439 355 2,288 378 
Dec 202114,637 3,979 4,978 3,017 448 1,967 248 
Gold soldkgDec 202212,378 3,148 3,319 2,543 606 2,762 — 
Jun 20226,481 1,603 1,424 265 366 2,823 — 
Dec 202117,495 4,928 5,560 3,558 558 2,891 — 
ozDec 2022397,962 101,211 106,708 81,759 19,483 88,800 — 
Jun 2022208,369 51,538 45,783 8,520 11,767 90,762 — 
Dec 2021562,477 158,439 178,758 114,392 17,940 92,948 — 
All-in-sustaining costR/kgDec 20221,124,737 1,219,187 1,309,129 1,171,844 867,987 799,421 — 
Jun 20221,542,355 1,692,452 2,252,809 5,415,094 969,945 808,360 — 
Dec 2021814,347 807,427 876,079 845,981 802,867 667,243 — 
All-in-sustaining costUS$/ozDec 20222,019 2,188 2,350 2,103 1,558 1,435 — 
Jun 20223,115 3,418 4,550 10,937 1,959 1,633 — 
Dec 20211,685 1,671 1,813 1,751 1,661 1,381 — 
All-in-costR/kgDec 20221,200,679 1,219,187 1,355,830 1,171,844 867,987 842,143 — 
Jun 20221,610,091 1,692,452 2,290,730 5,430,189 969,945 810,485 — 
Dec 2021836,639 807,427 895,324 847,948 802,867 680,387 — 
All-in-costUS$/ozDec 20222,155 2,188 2,433 2,103 1,558 1,511 — 
Jun 20223,252 3,418 4,627 10,967 1,959 1,637 — 
Dec 20211,731 1,671 1,853 1,755 1,661 1,408 — 
Average exchange rate for the six months ended 31 December 2022, 30 June 2022 and 31 December 2021 was R17.33/US$, R15.40/US$ and R15.03/US$, respectively
Figures may not add as they are rounded independently
1Cost of sales, before amortisation and depreciation includes all mining and processing costs, third party refining costs, corporate general and administrative costs, and permitting costs
2Share-based payments are calculated based on the fair value at initial recognition and do not include the adjustment of the cash-settled share-based payment obligation to the reporting date fair value
3Rehabilitation includes the interest charge related to the environmental rehabilitation obligation and the amortisation of the related capitalised rehabilitation costs. The interest charge related to the environmental rehabilitation obligation and the amortisation of the capitalised rehabilitation costs reflect the periodic costs of rehabilitation associated with current gold production
4All-in cost is calculated in accordance with the World Gold Council guidance. All-in cost excludes income tax, costs associated with merger and acquisition activities, working capital, impairments, financing costs, one time severance charges and items needed to normalise earnings. All-in cost is made up of All-in sustaining cost, being the cost to sustain current operations, given as a sub-total in the All-in cost calculation, together with corporate and major capital expenditure associated with growth. All-in sustaining cost per kilogram (and ounce) and All-in cost per kilogram (and ounce) are calculated by dividing the All-in sustaining cost and All-in cost, respectively, in a period by the total gold sold over the same period

Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 55


SALIENT FEATURES AND COST BENCHMARKS - YEAR
US and SA PGM operations
US OPERA-TIONS
SA OPERATIONS
Total US and SA PGM1
Total US PGM
Total SA PGM1
Rustenburg
Marikana1
KroondalPlat MileMimosa
Attributable
Under-
ground2
TotalUnder-
ground
SurfaceUnder-
ground
SurfaceUnder-
ground
SurfaceAttribu-tableSurfaceAttribu-table
Production
Tonnes milled/treated000'tDec 202237,799 1,154 36,644 16,991 19,653 6,037 5,610 6,315 3,698 3,251 10,345 1,387 
Dec 202139,776 1,469 38,307 18,090 20,217 6,341 5,712 6,802 3,869 3,525 10,636 1,422 
Plant head gradeg/tDec 20222.28 12.51 1.96 3.27 0.83 3.30 1.04 3.67 0.86 2.35 0.70 3.52 
Dec 20212.45 13.33 2.03 3.39 0.82 3.38 1.07 3.87 0.87 2.40 0.67 3.58 
Plant recoveries%Dec 202275.26 90.40 72.16 84.97 28.54 86.44 40.11 86.81 25.49 82.13 20.77 73.58 
Dec 202176.78 89.71 73.31 85.59 27.90 87.72 34.57 87.11 26.11 83.28 22.91 72.86 
Yieldg/tDec 20221.72 11.31 1.42 2.78 0.24 2.85 0.42 3.19 0.22 1.93 0.15 2.59 
Dec 20211.88 11.96 1.49 2.90 0.23 2.96 0.37 3.37 0.23 2.00 0.15 2.61 
PGM production3
4Eoz - 2EozDec 20222,088,597 421,133 1,667,464 1,517,804 149,660 553,663 75,234 646,851 26,066 201,756 48,360 115,534 
Dec 20212,406,538 570,400 1,836,138 1,687,446 148,692 604,436 67,938 737,228 28,258 226,531 52,496 119,251 
PGM sold4
4Eoz - 2EozDec 20222,080,657 418,556 1,662,101 554,101 70,693 676,958201,756 48,360 110,233 
Dec 20212,433,886 548,276 1,885,610 608,817 65,894 822,389226,531 52,496 109,483 
Price and costs5
Average PGM basket price6
R/4Eoz - R/2EozDec 202240,276 30,482 42,914 43,998 31,055 43,03545,795 34,237 33,494 
Dec 202143,281 31,021 47,066 47,841 29,774 47,25151,938 35,852 35,628 
Average PGM basket price6US$/4Eoz - US$/2EozDec 20222,461 1,862 2,622 2,688 1,897 2,6292,798 2,092 2,046 
Dec 20212,926 2,097 3,182 3,235 2,013 3,1953,512 2,424 2,409 
Operating cost7
R/tDec 20221,049 6,811 860 1,869 240 1,3691,049 56 1,385 
Dec 2021949 5,174 781 1,643 195 1,273896 50 1,122 
Operating cost7US$/tDec 202264 416 53 114 15 8464 3 85 
Dec 202164 350 53 111 13 8661 3 76 
Operating cost7R/4Eoz - R/2EozDec 202219,357 18,671 19,543 20,377 17,931 20,36516,912 12,055 16,627 
Dec 202115,918 13,324 16,780 17,239 16,368 17,75213,941 10,115 13,384 
Operating cost7US$/4Eoz - US$/2EozDec 20221,183 1,141 1,194 1,245 1,096 1,2441,033 737 1,016 
Dec 20211,076 901 1,135 1,166 1,107 1,200943 684 905 
Adjusted EBITDA margin8
%Dec 202246 53 545356 31 54 
Dec 202159 61 645866 32 63 
All-in sustaining cost9
R/4Eoz - R/2EozDec 202220,730 25,951 19,313 19,91420,50015,514 10,835 18,817 
Dec 202116,451 14,851 16,982 18,46017,39412,943 9,486 14,549 
All-in sustaining cost9US$/4Eoz - US$/2EozDec 20221,267 1,586 1,180 1,2171,253948 662 1,150 
Dec 20211,112 1,004 1,148 1,2481,176875 641 984 
All-in cost9
R/4Eoz - R/2EozDec 202221,886 29,145 19,916 19,91421,89115,514 10,835 18,817 
Dec 202117,599 19,078 17,108 18,46017,67512,943 9,486 14,549 
All-in cost9US$/4Eoz - US$/2EozDec 20221,337 1,781 1,217 1,2171,337948 662 1,150 
Dec 20211,190 1,290 1,157 1,2481,195875 641 984 
Capital expenditure5
Ore reserve developmentRmDec 20225,010 2,887 2,123 6871,436— — — 
Dec 20212,930 1,354 1,576 629947— — — 
Sustaining capitalRmDec 20223,240 1,184 2,056 6901,072273 21 864 
Dec 20212,810 791 2,019 6191,104268 28 499 
Corporate and projectsRmDec 20222,270 1,345 925 —924— — — 
Dec 20212,614 2,411 203 —203— — — 
Total capital expenditureRmDec 202210,520 5,416 5,104 1,3773,432273 21 864 
Dec 20218,354 4,556 3,798 1,2482,254268 28 499 
Total capital expenditureUS$mDec 2022643 331 312 8421017 1 53 
Dec 2021565 308 257 8415218 2 34 
Average exchange rates for the year ended 31 December 2022 and 31 December 2021 were R16.37/US$ and R14.79/US$, respectively
Figures may not add as they are rounded independently
1The Total US and SA PGM, Total SA PGM and Marikana excludes the production and costs associated with the purchase of concentrate (PoC) from third parties. For a reconciliation of the Operating cost, AISC and AIC excluding third party PoC, refer to “Reconciliation of operating cost excluding third party PoC for Total US and SA PGM, Total SA PGM and Marikana - Year” and “Reconciliation of AISC and AIC excluding third party PoC for Total US and SA PGM, Total SA PGM and Marikana – Year”
2The US PGM operations’ underground production is converted to metric tonnes and kilograms, and performance is translated into rand. In addition to the US PGM operations’ underground production, the operation treats various recycling material which is excluded from the statistics shown above and is detailed in the PGM recycling table on the next page
3The Production per product – see prill split table on the next page
4PGM sold includes the third party PoC ounces sold
5The total US and SA PGM and Total SA PGM operations’ unit cost benchmarks and capital expenditure exclude the financial results of Mimosa, which is equity accounted and excluded from revenue and cost of sales
6The average PGM basket price is the PGM revenue per 4E/2E ounce, prior to a purchase of concentrate adjustment
7Operating cost is the average cost of production and operating cost per tonne is calculated by dividing costs of sales, before amortisation and depreciation and change in inventory in a period, by the tonnes milled/treated in the same period, and operating cost per ounce (and kilogram) is calculated by dividing the cost of sales, before amortisation and depreciation and change in inventory in a period, by the PGM produced in the same period
8Adjusted EBITDA margin is calculated by dividing adjusted EBITDA by revenue
9All-in cost is calculated in accordance with the World Gold Council guidance. All-in cost excludes income tax, costs associated with merger and acquisition activities, working capital, impairments, financing costs, one-time severance charges and items needed to normalise earnings. All-in cost is made up of All-in sustaining cost, being the cost to sustain current operations, given as a sub-total in the All-in cost calculation, together with corporate and major capital expenditure associated with growth. All-in sustaining cost per ounce (and kilogram)and All-in cost per ounce (and kilogram) are calculated by dividing the All-in sustaining cost and All-in cost, respectively, in a period by the total 4E/2E PGM produced in the same period. For a reconciliation of cost of sales before amortisation and depreciation to All-in cost, see “All-in costs – Year”

Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 56


Mining - PGM Prill split including third party PoC, excluding recycling operations
GROUP PGMSA OPERATIONSUS OPERATIONS
Dec 2022Dec 2021Dec 2022Dec 2021Dec 2022Dec 2021
%%%%%%
Platinum1,124,891 52 %1,251,708 51 %1,028,340 59 %1,122,56859 %96,551 23 %129,140 23 %
Palladium841,330 39 %1,007,495 41 %516,748 30 %566,23630 %324,582 77 %441,259 77 %
Rhodium153,401 7 %165,454 7 %153,401 9 %165,4549 %
Gold32,319 2 %42,414 2 %32,319 2 %42,4142 %
PGM production 4E/2E2,151,941 100 %2,467,070 100 %1,730,808 100 %1,896,670100 %421,133 100 %570,400 100 %
Ruthenium243,869 294,484 243,869 294,484
Iridium61,501 68,234 61,501 68,234
Total 6E/2E2,457,311 2,829,788 2,036,178 2,259,388421,133 570,400 
Figures may not add as they are rounded independently


Recycling at US operations
UnitDec 2022Dec 2021
Average catalyst fed/dayTonne18.8 23.8 
Total processedTonne6,876 8,673 
TolledTonne— 38 
PurchasedTonne6,876 8,636 
PGM fed3Eoz598,774 755,149 
PGM sold3Eoz643,200 782,552 
PGM tolled returned3Eoz7,336 12,630 

Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 57


SA gold operations
SA OPERATIONS
Total SA goldDriefonteinKloofBeatrixCookeDRDGOLD
TotalUnder-
ground
SurfaceUnder-
ground
SurfaceUnder-
ground
SurfaceUnder-
ground
SurfaceSurfaceSurface
Production
Tonnes milled/treated000'tDec 202236,172 2,761 33,411 840 694 992 1,954 929 124 4,074 26,565 
Dec 202144,402 5,162 39,240 1,474 563 1,862 4,141 1,826 650 4,642 29,244 
Yieldg/tDec 20220.53 4.25 0.23 5.45 0.46 4.34 0.32 3.08 0.41 0.25 0.21 
Dec 20210.75 4.79 0.22 6.11 0.45 5.13 0.33 3.37 0.36 0.25 0.19 
Gold producedkgDec 202219,301 11,736 7,565 4,574 319 4,300 620 2,862 51 1,010 5,565 
Dec 202133,372 24,719 8,653 9,013 252 9,558 1,378 6,148 232 1,166 5,625 
ozDec 2022620,541 377,321 243,220 147,057 10,256 138,248 19,933 92,015 1,640 32,472 178,919 
Dec 20211,072,934 794,734 278,200 289,775 8,102 307,297 44,304 197,663 7,459 37,488 180,848 
Gold soldkgDec 202218,859 11,367 7,492 4,464 287 4,146 597 2,757 51 972 5,585 
Dec 202133,374 24,710 8,664 9,076 238 9,561 1,400 6,073 232 1,175 5,619 
ozDec 2022606,331 365,457 240,873 143,521 9,227 133,297 19,194 88,640 1,640 31,251 179,562 
Dec 20211,072,999 794,445 278,554 291,800 7,652 307,393 45,011 195,251 7,459 37,777 180,655 
Price and costs
Gold price receivedR/kgDec 2022946,073 944,222945,815954,772941,358944,315 
Dec 2021849,703 851,621847,915847,423850,213852,465 
Gold price receivedUS$/ozDec 20221,798 1,7941,7971,8141,7891,795 
Dec 20211,787 1,7911,7831,7821,7881,793 
Operating cost1
R/tDec 2022573 5,524 164 6,289 282 6,045 302 4,277 557 210 142 
Dec 2021503 3,310 134 3,778 234 3,769 206 2,464 182 174 115 
US$/tDec 202235 338 10 384 17 369 18 261 34 13 9 
Dec 202134 224 9 255 16 255 14 167 12 12 8 
R/kgDec 20221,074,400 1,299,591 725,050 1,154,569 614,420 1,394,419 953,226 1,388,889 1,352,941 846,535 678,167 
Dec 2021669,723 691,209 608,344 617,885 523,810 734,149 619,739 731,945 508,621 692,967 595,911 
US$/ozDec 20222,042 2,470 1,378 2,194 1,168 2,650 1,811 2,639 2,571 1,609 1,289 
Dec 20211,408 1,454 1,279 1,299 1,102 1,544 1,303 1,539 1,070 1,457 1,253 
Adjusted EBITDA margin2
R/kgDec 2022(20)(22)(46)(50)(68)29 
Dec 202118 271513(42)29 
All-in sustaining cost3
R/kgDec 20221,268,360 1,378,8681,592,0301,573,006907,407804,297 
Dec 2021803,260 793,000858,316857,256742,979665,065 
All-in sustaining cost2US$/ozDec 20222,410 2,6203,0252,9891,7241,528 
Dec 20211,689 1,6681,8051,8031,5621,399 
All-in cost3
R/kgDec 20221,341,588 1,378,8681,636,3061,574,430907,407826,500 
Dec 2021821,358 793,000876,380858,366742,979673,429 
All-in cost2US$/ozDec 20222,549 2,6203,1102,9921,7241,571 
Dec 20211,727 1,6681,8431,8051,5621,416 
Capital expenditure
Ore reserve developmentRmDec 20221,630 794620216—— 
Dec 20212,604 1,177930497—— 
Sustaining capitalRmDec 20221,615 358455155—647 
Dec 20211,304 322488164—330 
Corporate and projects4
RmDec 20221,314 —2104—124 
Dec 2021472 —1987—47 
Total capital expenditure RmDec 20224,559 1,1521,285375—771 
Dec 20214,380 1,4991,616668—377 
Total capital expenditureUS$mDec 2022279 707923—47 
Dec 2021296 10110945—25 
Average exchange rates for the year ended 31 December 2022 and 31 December 2021 were R16.37/US$ and R14.79/US$, respectively
Figures may not add as they are rounded independently
1Operating cost is the average cost of production and operating cost per tonne is calculated by dividing the cost of sales, before amortisation and depreciation and change in inventory in a period, by the tonnes milled/treated in the same period, and operating cost per kilogram (and ounce) is calculated by dividing the cost of sales, before amortisation and depreciation and change in inventory in a period, by the gold produced in the same period
2Adjusted EBITDA margin is calculated by dividing adjusted EBITDA by revenue
3All-in cost is calculated in accordance with the World Gold Council guidance. All-in cost excludes income tax, costs associated with merger and acquisition activities, working capital, impairments, financing costs, one time severance charges and items needed to normalise earnings. All-in cost is made up of All-in sustaining cost, being the cost to sustain current operations, given as a sub-total in the All-in cost calculation, together with corporate and major capital expenditure associated with growth. All-in sustaining cost per kilogram (and ounce) and All-in cost per kilogram (and ounce) are calculated by dividing the All-in sustaining cost and All-in cost, respectively, in a period by the total gold sold over the same period. For a reconciliation of cost of sales before amortisation and depreciation to All-in cost, see “All-in costs – Year”
4Corporate project expenditure, which comprises spend on various Corporate IT projects and the Burnstone project, for the years ended 31 December 2022 and 31 December 2021 was R976 million (US$60 million) and R220 million (US$15 million), respectively

Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 58



European operations

Sibanye-Stillwater Sandouville refinery
Battery metal split
Dec 20221
Volumes produced (tonnes)%
Nickel Salts2
2,003 29 %
Nickel Metal4,839 71 %
Total Nickel production tNi6,842 100 %
Nickel Cakes3
284 
Cobalt Chloride (CoCl2)4
153 
Ferric Chloride (FeCl3)4
1,399 
Volumes sales (tonnes)
Nickel Salts2
1,860 27 %
Nickel Metal4,987 73 %
Total Nickel sold tNi6,847 100 %
Cobalt Chloride (CoCl2)4
164 
Ferric Chloride (FeCl3)4
1,399 


Nickel equivalent basket priceUnit
Dec 20221
Revenue from sale of productsRm3,140 
Nickel products soldtNi6,847 
Nickel equivalent average basket priceR/tNi458,595 
Nickel equivalent average basket priceUS$/tNi28,019 


Nickel equivalent sustaining costUnit
Dec 20221
Cost of sales, before amortisation and depreciationRm3,631 
Carbon taxRm— 
Community costsRm— 
Share-based paymentsRm— 
Rehabilitation interest and amortisationRm5 
LeasesRm14 
Sustaining capital expenditureRm90 
Less: By-product creditRm(127)
Nickel equivalent sustaining costRm3,613 
Nickel products soldtNi6,847 
Nickel equivalent sustaining costR/tNi527,676 
Nickel equivalent sustaining costUS$/tNi32,239 
Nickel recovery yield5
%95.54 %
Average exchange rate for the year ended 31 December 2022 was R16.37/US$
Figures may not add as they are rounded independently

1Amounts included since effective date of the acquisition on 4 February 2022
2Nickel salts consist of anhydrous nickel, nickel chloride low sodium, nickel chloride standard, nickel carbonate and nickel chloride solution
3Nickel cakes occur during the processing of nickel matte and are recycled back into the nickel refining process
4Cobalt chloride and ferric chloride are obtained from nickel matte through a different refining process on an order basis
5Nickel recovery yield is the percentage of total nickel recovered from the matte relative to the nickel contained in the matte received
Non-IFRS measures such as the Nickel equivalent sustaining cost is the responsibility of the Group’s Board of Directors and is presented for illustration purposes only, and because of its nature, Nickel equivalent sustaining cost should not be considered as a representation of financial performance
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 59


ALL-IN COSTS - YEAR
SA and US PGM operations
US
OPERATIONS
SA OPERATIONS
R' million
Total US and SA PGM1
Total US PGM2
Total SA PGM1
Rustenburg
Marikana1
KroondalPlat MileMimosaCorporate
Cost of sales, before amortisation and depreciation3
Dec 202239,739 7,458 32,281 13,547 14,603 3,548 583 1,936 (1,936)
Dec 202139,539 7,567 31,972 11,464 16,561 3,416 531 1,587 (1,587)
RoyaltiesDec 20221,772 — 1,772 1,024 734 14 — 127 (127)
Dec 20212,547 — 2,547 1,405 1,128 14 — 160 (160)
Carbon taxDec 2022— — — (1)2 (1)— — — 
Dec 20211 — 1 — 1 — — — — 
Community costsDec 2022144 — 144 — 144 — — — — 
Dec 2021161 — 161 12 150 — — — (1)
Inventory changeDec 20222,720 405 2,315 101 2,214 — — (15)15 
Dec 20211,327 33 1,294 816 478 — — 9 (9)
Share-based payments4
Dec 2022315 137 178 68 87 22 2 — — 
Dec 2021199 86 113 45 53 15 — — — 
Rehabilitation interest and amortisation5
Dec 2022193 52 141 (11)66 86 — 14 (14)
Dec 2021275 31 244 — 162 81 — 4 (3)
LeasesDec 202262 6 56 12 38 6 — — — 
Dec 202154 1 53 11 35 7 — — — 
Ore reserve developmentDec 20225,010 2,887 2,123 687 1,436 — — — — 
Dec 20212,930 1,354 1,576 629 947 — — — — 
Sustaining capital expenditureDec 20223,240 1,184 2,056 690 1,072 273 21 864 (864)
Dec 20212,810 791 2,019 619 1,104 268 28 499 (499)
Less: By-product creditDec 2022(9,835)(1,200)(8,635)(3,593)(4,142)(818)(82)(752)752 
Dec 2021(9,287)(1,392)(7,895)(2,589)(4,376)(869)(61)(524)524 
Total All-in-sustaining costs6
Dec 202243,360 10,929 32,431 12,524 16,254 3,130 524 2,174 (2,174)
Dec 202140,556 8,471 32,085 12,412 16,243 2,932 498 1,735 (1,735)
Plus: Corporate cost, growth and capital expenditureDec 20222,282 1,345 937 — 936 — — — 1 
Dec 20212,626 2,411 215 — 215 — — — — 
Total All-in-costs6
Dec 202245,642 12,274 33,368 12,524 17,190 3,130 524 2,174 (2,173)
Dec 202143,182 10,882 32,300 12,412 16,458 2,932 498 1,735 (1,735)
PGM production4Eoz - 2EozDec 20222,151,941 421,133 1,730,808 628,897 736,261 201,756 48,360 115,534 — 
Dec 20212,467,070 570,400 1,896,670 672,374 826,018 226,531 52,496 119,251 — 
kgDec 202266,933 13,099 53,834 19,561 22,900 6,275 1,504 3,594 — 
Dec 202176,734 17,741 58,993 20,913 25,692 7,046 1,633 3,709 — 
All-in-sustaining costR/4Eoz - R/2EozDec 202221,292 25,951 20,078 19,914 22,076 15,514 10,835 18,817 — 
Dec 202117,274 14,851 18,051 18,460 19,664 12,943 9,486 14,549 — 
US$/4Eoz - US$/2EozDec 20221,301 1,586 1,227 1,217 1,349 948 662 1,150 — 
Dec 20211,168 1,004 1,221 1,248 1,330 875 641 984 — 
All-in-costR/4Eoz - R/2EozDec 202222,413 29,145 20,658 19,914 23,348 15,514 10,835 18,817 — 
Dec 202118,392 19,078 18,172 18,460 19,925 12,943 9,486 14,549 — 
US$/4Eoz - US$/2EozDec 20221,369 1,781 1,262 1,217 1,426 948 662 1,150 — 
Dec 20211,244 1,290 1,229 1,248 1,347 875 641 984 — 
Average exchange rates for the year ended 31 December 2022 and 31 December 2021 were R16.37/US$ and R14.79/US$, respectively
Figures may not add as they are rounded independently
1The Total US and SA PGM, Total SA PGM and Marikana includes the production and costs associated with the purchase of concentrate (PoC) from third parties. For a reconciliation of the Operating cost, AISC and AIC excluding third party PoC, refer to “Reconciliation of operating cost excluding third party PoC for Total US and SA PGM, Total SA PGM and Marikana - Year” and “Reconciliation of AISC and AIC excluding third party PoC for Total US and SA PGM, Total SA PGM and Marikana – Year”
2The US PGM operations’ underground production is converted to metric tonnes and kilograms, and performance is translated into SA rand. In addition to the US PGM operations’ underground production, the operation processes various recycling material which is excluded from the 2E PGM production, All-in sustaining cost and All-in cost statistics shown
3Cost of sales, before amortisation and depreciation includes all mining and processing costs, third party refining costs, corporate general and administrative costs, and permitting costs
4Share-based payments are calculated based on the fair value at initial recognition and do not include the adjustment of the cash-settled share-based payment obligation to the reporting date fair value
5Rehabilitation includes the interest charge related to the environmental rehabilitation obligation and the amortisation of the related capitalised rehabilitation costs. The interest charge related to the environmental rehabilitation obligation and the amortisation of the capitalised rehabilitation costs reflect the periodic costs of rehabilitation associated with current PGM production
6All-in cost is calculated in accordance with the World Gold Council guidance. All-in cost excludes income tax, costs associated with merger and acquisition activities, working capital, impairments, financing costs, one-time severance charges and items needed to normalise earnings. All-in cost is made up of All-in sustaining cost, being the cost to sustain current operations, given as a sub-total in the All-in cost calculation, together with corporate and major capital expenditure associated with growth. All-in sustaining cost per ounce (and kilogram) and All-in cost per ounce (and kilogram) are calculated by dividing the All-in sustaining cost and All-in cost, respectively, in a period by the total 4E/2E PGM produced in the same period
Non-IFRS measures such as All-in sustaining cost and All-in cost is the responsibility of the Group’s Board of Directors and is presented for illustration purposes only, and because of its nature, All-in sustaining cost and All-in cost should not be considered as a representation of financial performance.

Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 60


Reconciliation of operating cost excluding third party PoC for Total US and SA PGM, Total SA PGM and Marikana - Year
Total US and SA PGMTotal SA PGMMarikana
R' millionDec 2022Dec 2021Dec 2022Dec 2021Dec 2022Dec 2021
Cost of sales, before amortisation and depreciation as reported per table above39,739 39,539 32,281 31,972 14,603 16,561 
Inventory change as reported per table above2,720 1,327 2,315 1,294 2,214 478 
Less: Chrome cost of sales(1,528)(1,286)(1,528)(1,286)(375)(280)
Total operating cost including third party PoC40,931 39,580 33,068 31,980 16,442 16,759 
Less: Purchase cost of PoC(2,738)(3,170)(2,738)(3,170)(2,738)(3,170)
Total operating cost excluding third party PoC38,193 36,410 30,330 28,810 13,704 13,589 
PGM production as reported per table above4Eoz- 2Eoz2,151,941 2,467,070 1,730,808 1,896,670 736,261 826,018 
Less: Mimosa production (115,534)(119,251)(115,534)(119,251)— — 
PGM production excluding Mimosa2,036,407 2,347,819 1,615,274 1,777,419 736,261 826,018 
Less: PoC production(63,344)(60,532)(63,344)(60,532)(63,344)(60,532)
PGM production excluding Mimosa and third party PoC1,973,063 2,287,287 1,551,930 1,716,887 672,917 765,486 
PGM production including Mimosa and excluding third party PoC2,088,597 2,406,538 1,667,464 1,836,138 672,917 765,486 
Tonnes milled/treated000't37,799 39,776 36,644 38,307 10,013 10,671 
Less: Mimosa tonnes(1,387)(1,422)(1,387)(1,422)— — 
PGM tonnes excluding Mimosa and third party PoC36,411 38,354 35,257 36,885 10,013 10,671 
Operating cost including third party PoCR/4Eoz-R/2Eoz20,100 16,858 20,472 17,992 22,332 20,289 
US$/4Eoz-US$/2Eoz1,228 1,140 1,251 1,217 1,364 1,372 
R/t1,124 1,032 938 867 1,642 1,571 
US$/t69 70 57 59 100 106 
Operating cost excluding third party PoCR/4Eoz-R/2Eoz19,357 15,918 19,543 16,780 20,365 17,752 
US$/4Eoz-US$/2Eoz1,183 1,076 1,194 1,135 1,244 1,200 
R/t1,049 949 860 781 1,369 1,273 
US$/t64 64 53 53 84 86 

Reconciliation of AISC and AIC excluding third party PoC for Total US and SA PGM, Total SA PGM and Marikana - Year
Total US and SA PGMTotal SA PGMMarikana
R' millionDec 2022Dec 2021Dec 2022Dec 2021Dec 2022Dec 2021
Total All-in-sustaining cost as reported per table above43,360 40,556 32,431 32,085 16,254 16,243 
Less: Purchase cost of PoC(2,738)(3,170)(2,738)(3,170)(2,738)(3,170)
Add: By-product credit of PoC279 242 279 242 279 242 
Total All-in-sustaining cost excluding third party PoC40,901 37,628 29,972 29,157 13,795 13,315 
Plus: Corporate cost, growth and capital expenditure2,282 2,626 937 215 936 215 
Total All-in-cost excluding third party PoC43,183 40,254 30,909 29,372 14,731 13,530 
PGM production excluding Mimosa and third party PoC4Eoz- 2Eoz1,973,063 2,287,287 1,551,930 1,716,887 672,917 765,486 
All-in-sustaining cost excluding third party PoCR/4Eoz-R/2Eoz20,730 16,451 19,313 16,982 20,500 17,394 
US$/4Eoz-US$/2Eoz1,267 1,112 1,180 1,148 1,253 1,176 
All-in-cost excluding third party PoCR/4Eoz-R/2Eoz21,886 17,599 19,916 17,108 21,891 17,675 
US$/4Eoz-US$/2Eoz1,337 1,190 1,217 1,157 1,337 1,195 
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 61



SA gold operations
SA OPERATIONS
R' millionTotal SA goldDriefonteinKloofBeatrixCookeDRDGOLDCorporate
Cost of sales, before amortisation and depreciation1
Dec 202220,175 5,281 6,381 3,911 822 3,780 — 
Dec 202122,256 5,691 7,845 4,565 808 3,347 — 
RoyaltiesDec 202262 22 22 13 5 — — 
Dec 2021167 95 46 27 5 — (6)
Carbon taxDec 2022(10)— — (10)— — — 
Dec 20212 — — 2 — — — 
Community costsDec 202294 33 27 23 — 11 — 
Dec 2021127 46 38 34 1 8 — 
Share-based payments2
Dec 2022146 49 47 31 — 19 — 
Dec 2021100 23 35 23 — 19 — 
Rehabilitation interest and amortisation3
Dec 2022141 12 (17)51 52 16 27 
Dec 2021189 32 17 70 47 18 5 
LeasesDec 202280 5 18 29 4 24 — 
Dec 202182 8 14 28 13 19 — 
Ore reserve developmentDec 20221,630 794 620 216 — — — 
Dec 20212,604 1,177 930 497 — — — 
Sustaining capital expenditureDec 20221,615 358 455 155 — 647 — 
Dec 20211,304 322 488 164 — 330 — 
Less: By-product creditDec 2022(13)(3)(2)(2)(1)(5)— 
Dec 2021(23)(8)(5)(5)(1)(4)— 
Total All-in-sustaining costs4
Dec 202223,920 6,551 7,551 4,417 882 4,492 27 
Dec 202126,808 7,386 9,408 5,405 873 3,737 (1)
Plus: Corporate cost, growth and capital expenditureDec 20221,381 — 210 4 — 124 1,043 
Dec 2021604 — 198 7 — 47 352 
Total All-in-costs4
Dec 202225,301 6,551 7,761 4,421 882 4,616 1,070 
Dec 202127,412 7,386 9,606 5,412 873 3,784 351 
Gold soldkgDec 202218,859 4,751 4,743 2,808 972 5,585 — 
Dec 202133,374 9,314 10,961 6,305 1,175 5,619 — 
ozDec 2022606,331 152,748 152,491 90,279 31,251 179,562 — 
Dec 20211,072,999 299,452 352,404 202,710 37,777 180,655 — 
All-in-sustaining costR/kgDec 20221,268,360 1,378,868 1,592,030 1,573,006 907,407 804,297 — 
Dec 2021803,260 793,000 858,316 857,256 742,979 665,065 — 
All-in-sustaining costUS$/ozDec 20222,410 2,620 3,025 2,989 1,724 1,528 — 
Dec 20211,689 1,668 1,805 1,803 1,562 1,399 — 
All-in-costR/kgDec 20221,341,588 1,378,868 1,636,306 1,574,430 907,407 826,500 — 
Dec 2021821,358 793,000 876,380 858,366 742,979 673,429 — 
All-in-costUS$/ozDec 20222,549 2,620 3,110 2,992 1,724 1,571 — 
Dec 20211,727 1,668 1,843 1,805 1,562 1,416 — 
Average exchange rates for the year ended 31 December 2022 and 31 December 2021 were R16.37/US$ and R14.79/US$, respectively
Figures may not add as they are rounded independently
1 Cost of sales, before amortisation and depreciation includes all mining and processing costs, third party refining costs, corporate general and administrative costs, and permitting costs
2 Share-based payments are calculated based on the fair value at initial recognition and do not include the adjustment of the cash-settled share-based payment obligation to the reporting date fair value
3 Rehabilitation includes the interest charge related to the environmental rehabilitation obligation and the amortisation of the related capitalised rehabilitation costs. The interest charge related to the environmental rehabilitation obligation and the amortisation of the capitalised rehabilitation costs reflect the periodic costs of rehabilitation associated with current gold production
4 All-in cost is calculated in accordance with the World Gold Council guidance. All-in cost excludes income tax, costs associated with merger and acquisition activities, working capital, impairments, financing costs, one time severance charges and items needed to normalise earnings. All-in cost is made up of All-in sustaining cost, being the cost to sustain current operations, given as a sub-total in the All-in cost calculation, together with corporate and major capital expenditure associated with growth. All-in sustaining cost per kilogram (and ounce) and All-in cost per kilogram (and ounce) are calculated by dividing the All-in sustaining cost and All-in cost, respectively, in a period by the total gold sold over the same period
Non-IFRS measures such as All-in sustaining cost and All-in cost is the responsibility of the Group’s Board of Directors and is presented for illustration purposes only, and because of its nature, All-in sustaining cost and All-in cost should not be considered as a representation of financial performance.

Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 62


SALIENT FEATURES AND COST BENCHMARKS - QUARTERS
US and SA PGM operations
US OPERA-TIONS
SA OPERATIONS
Total US and SA PGM1
Total US PGM
Total SA PGM1
Rustenburg
Marikana1
KroondalPlat MileMimosa
Attributable
Under-
ground2
TotalUnder-
ground
SurfaceUnder-
ground
SurfaceUnder-
ground
SurfaceAttribu-tableSurfaceAttribu-table
Production
Tonnes milled/treated000'tDec 20229,242 286 8,9564,2294,7271,399 1,385 1,660 892 823 2,450 347 
Sep 20229,625 241 9,383 4,3035,0811,666 1,418 1,515 927 782 2,736 340 
Plant head gradeg/tDec 20222.31 12.60 1.98 3.270.823.31 1.08 3.62 0.86 2.40 0.66 3.53 
Sep 20222.21 12.23 1.96 3.300.823.34 1.03 3.70 0.87 2.33 0.69 3.52 
Plant recoveries%Dec 202275.42 91.20 72.30 84.9427.2086.22 33.77 86.75 26.01 82.43 21.62 74.39 
Sep 202275.59 89.25 73.19 85.0932.6186.52 52.47 87.06 25.94 82.17 20.30 74.44 
Yieldg/tDec 20221.74 11.49 1.43 2.780.222.85 0.36 3.14 0.22 1.98 0.14 2.63 
Sep 20221.67 10.92 1.43 2.810.272.89 0.54 3.22 0.23 1.91 0.14 2.62 
PGM production3
4Eoz - 2EozDec 2022516,720 105,205 411,515 377,62733,888128,351 16,236 167,645 6,413 52,321 11,239 29,310 
Sep 2022518,032 85,889 432,143 388,46043,683154,797 24,641 156,873 6,723 48,120 12,319 28,670 
PGM sold4
4Eoz - 2EozDec 2022523,756 110,822 412,934 150,266 19,061 152,40252,321 11,239 27,645 
Sep 2022471,994 69,534 402,460 137,246 16,578 160,11548,120 12,319 28,082 
Price and costs5
Average PGM basket price6
R/4Eoz - R/2EozDec 202239,418 30,608 41,953 42,625 30,156 42,44644,636 33,775 33,279 
Sep 202240,485 30,878 42,269 43,331 34,278 42,03344,972 33,714 33,412 
Average PGM basket price6US$/4Eoz - US$/2EozDec 20222,238 1,738 2,382 2,420 1,712 2,4102,535 1,918 1,890 
Sep 20222,374 1,811 2,479 2,541 2,010 2,4652,638 1,977 1,960 
Operating cost7
R/tDec 20221,140 7,838 918 2,072 3001,3661,154 61 1,553 
Sep 20221,043 7,504 871 1,764 279 1,4591,049 58 1,493 
Operating cost7US$/tDec 202265 445 52 118 17 7866 3 88 
Sep 202261 440 51 103 16 8662 3 88 
Operating cost7R/4Eoz - R/2EozDec 202220,812 21,320 20,672 22,587 25,622 20,03418,138 13,346 18,390 
Sep 202219,793 21,085 19,518 18,986 16,071 21,76717,041 12,907 17,719 
Operating cost7US$/4Eoz - US$/2EozDec 20221,182 1,211 1,174 1,283 1,455 1,1381,030 758 1,044 
Sep 20221,161 1,237 1,145 1,114 943 1,277999 757 1,039 
All-in sustaining cost8
R/4Eoz - R/2EozDec 202224,066 32,613 21,713 23,54322,25716,819 12,457 24,053 
Sep 202221,271 30,947 19,211 18,43521,78515,399 11,283 21,032 
All-in sustaining cost8US$/4Eoz - US$/2EozDec 20221,367 1,852 1,233 1,3371,264955 707 1,366 
Sep 20221,248 1,815 1,127 1,0811,278903 662 1234
All-in cost8
R/4Eoz - R/2EozDec 202225,492 36,234 22,535 23,53624,06716,819 12,457 24,053 
Sep 202222,582 36,000 19,726 18,44123,05115,399 11,283 21,032 
All-in cost8US$/4Eoz - US$/2EozDec 20221,448 2,058 1,280 1,3371,367955 707 1,366 
Sep 20221,324 2,111 1,157 1,0821,352903 662 1,234 
Capital expenditure5
Ore reserve developmentRmDec 20221,481 887 594 178416— — — 
Sep 20221,313 723 590 194396— — — 
Sustaining capitalRmDec 20221,288 513 775 24543978 13 313 
Sep 2022758 293 465 14024280 3 258 
Corporate and projectsRmDec 2022692 381 311 (1)312— — — 
Sep 2022642 434 208 1207— — — 
Total capital expenditureRmDec 20223,461 1,781 1,680 4221,16778 13 313 
Sep 20222,713 1,450 1,263 33584580 3 258 
Total capital expenditureUS$mDec 2022197 101 95 24664 1 18 
Sep 2022159 85 74 20505 — 15 
Average exchange rate for the quarters ended 31 December 2022 and 30 September 2022 was R17.61/US$ and R17.05/US$, respectively
Figures may not add as they are rounded independently
1The Total US and SA PGM, Total SA PGM and Marikana excludes the production and costs associated with the purchase of concentrate (PoC) from third parties. For a reconciliation of the Operating cost, AISC and AIC excluding third party PoC, refer to “Reconciliation of operating cost excluding third party PoC for Total US and SA PGM, Total SA PGM and Marikana - Quarters” and “Reconciliation of AISC and AIC excluding third party PoC for Total US and SA PGM, Total SA PGM and Marikana – Quarters”
2The US PGM operations’ underground production is converted to metric tonnes and kilograms, and performance is translated into SA rand. In addition to the US PGM operations’ underground production, the operation treats recycling material which is excluded from the statistics shown above and is detailed in the PGM recycling table on the next page
3Production per product – see prill split in the table on the next page
4PGM sold includes the third party PoC ounces sold
5The Total US and SA PGM and Total SA PGM operations’ unit cost benchmarks and capital expenditure exclude the financial results of Mimosa, which is equity accounted and excluded from revenue and cost of sales
6The average PGM basket price is the PGM revenue per 4E/2E ounce, prior to a purchase of concentrate adjustment
7Operating cost is the average cost of production and operating cost per tonne is calculated by dividing the cost of sales, before amortisation and depreciation and change in inventory in a period by the tonnes milled/treated in the same period, and operating cost per ounce (and kilogram) is calculated by dividing the cost of sales, before amortisation and depreciation and change in inventory in a period by the PGM produced in the same period
8All-in cost is calculated in accordance with the World Gold Council guidance. All-in cost excludes income tax, costs associated with merger and acquisition activities, working capital, impairments, financing costs, one-time severance charges and items needed to normalise earnings. All-in cost is made up of All-in sustaining cost, being the cost to sustain current operations, given as a sub-total in the All-in cost calculation, together with corporate and major capital expenditure associated with growth. All-in sustaining cost per ounce (and kilogram) and All-in cost per ounce (and kilogram) are calculated by dividing the All-in sustaining cost and All-in cost, respectively, in a period by the total 4E/2E PGM produced in the same period. For a reconciliation of cost of sales, before amortisation and depreciation to All-in cost, see “All-in costs - Quarters”
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 63


Mining - PGM Prill split including third party PoC, excluding recycling operations
GROUP PGMSA OPERATIONSUS OPERATIONS
Dec 2022Sep 2022Dec 2022Sep 2022Dec 2022Sep 2022
%%%%%%
Platinum282,016 52 %286,103 54 %257,964 60 %265,97559 %24,052 23 %20,128 23 %
Palladium209,447 39 %200,137 37 %128,294 30 %134,37630 %81,153 77 %65,761 77 %
Rhodium38,487 7 %40,296 8 %38,487 9 %40,2969 %
Gold8,048 1 %8,216 2 %8,048 2 %8,2162 %
PGM production 4E/2E537,998 100 %534,752 100 %432,793 100 %448,863100 %105,205 100 %85,889 100 %
Ruthenium60,965 64,192 60,965 64,192
Iridium15,602 16,034 15,602 16,034
Total 6E/2E614,565 614,978 509,360 529,089105,205 85,889 
Figures may not add as they are rounded independently


Recycling at US operations
UnitDec 2022Sep 2022
Average catalyst fed/dayTonne12.1 17.7 
Total processedTonne1,110 1,630 
TolledTonne— — 
PurchasedTonne1,110 1,630 
PGM fed3Eoz95,881 141,560 
PGM sold3Eoz118,982 162,659 
PGM tolled returned3Eoz743 4,715 

Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 64


SA gold operations
SA OPERATIONS
Total SA goldDriefonteinKloofBeatrixCookeDRDGOLD
TotalUnder-
ground
SurfaceUnder-
ground
SurfaceUnder-
ground
SurfaceUnder-
ground
SurfaceSurfaceSurface
Production
Tonnes milled/treated000'tDec 20229,064 1,152 7,912 313 366 400 670 439 106 1,085 5,685 
Sep 202210,237 1,117 9,120 290 123 336 620 490 18 1,202 7,157 
Yieldg/tDec 20220.77 4.25 0.26 4.86 0.52 4.73 0.34 3.38 0.40 0.31 0.22 
Sep 20220.62 3.90 0.22 5.65 0.41 4.14 0.31 2.69 — 0.27 0.20 
Gold producedkgDec 20226,973 4,896 2,077 1,523 190 1,891 230 1,482 42 337 1,278 
Sep 20226,366 4,354 2,012 1,640 50 1,393 190 1,321 — 319 1,453 
ozDec 2022224,187 157,410 66,777 48,966 6,109 60,797 7,395 47,647 1,350 10,835 41,089 
Sep 2022204,672 139,984 64,687 52,727 1,608 44,786 6,109 42,471 — 10,256 46,715 
Gold soldkgDec 20226,308 4,314 1,994 1,437 139 1,633 198 1,244 42 295 1,320 
Sep 20226,070 4,095 1,975 1,524 48 1,314 174 1,257 — 311 1,442 
ozDec 2022202,807 138,698 64,109 46,201 4,469 52,502 6,366 39,996 1,350 9,484 42,439 
Sep 2022195,155 131,657 63,498 48,998 1,543 42,246 5,594 40,413 — 9,999 46,361 
Price and costs
Gold price receivedR/kgDec 2022971,623 972,081969,962969,673962,712977,273 
Sep 2022944,316 944,020944,220942,721945,338945,908 
Gold price receivedUS$/ozDec 20221,716 1,7171,7131,7131,7001,726 
Sep 20221,723 1,7221,7221,7201,7251,726 
Operating cost1
R/tDec 2022652 3,838 188 4,721 254 4,340 257 2,749 94 254 165 
Sep 2022645 4,573 163 5,623 359 5,388 305 3,393 1,222 214 137 
US$/tDec 202237 218 11 268 14 246 15 156 5 14 9 
Sep 202238 268 10 330 21 316 18 199 72 13 8 
R/kgDec 2022847,268 902,778 716,418 971,110 489,474 916,975 747,826 814,440 238,095 818,991 733,177 
Sep 20221,036,601 1,173,404 740,557 995,732 880,000 1,300,790 994,737 1,259,652 — 805,643 673,090 
US$/ozDec 20221,496 1,595 1,265 1,715 865 1,620 1,321 1,438 421 1,447 1,295 
Sep 20221,891 2,141 1,351 1,816 1,605 2,373 1,815 2,298 — 1,470 1,228 
All-in sustaining cost2
R/kgDec 20221,041,218 1,220,8121,130,530924,572871,186837,121 
Sep 20221,210,049 1,215,0131,527,5541,424,025861,736765,603 
All-in sustaining cost2US$/ozDec 20221,839 2,1561,9971,6331,5391,479 
Sep 20222,207 2,2162,7872,5981,5721,397 
All-in cost2
R/kgDec 20221,110,812 1,220,8121,157,837924,572871,186886,364 
Sep 20221,293,245 1,215,0131,598,1181,424,025861,736802,358 
All-in cost2US$/ozDec 20221,962 2,1562,0451,6331,5391,566 
Sep 20222,359 2,2162,9152,5981,5721,464 
Capital expenditure
Ore reserve developmentRmDec 2022691 33426295— — 
Sep 2022472 20817490— — 
Sustaining capitalRmDec 2022480 15415350— 123 
Sep 2022409 10915037— 113 
Corporate and projects3
RmDec 2022423 —50—— 65 
Sep 2022488 —105—— 53 
Total capital expenditure RmDec 20221,594 488465145— 188 
Sep 20221,369 317429127— 166 
Total capital expenditureUS$mDec 202291 28268— 11 
Sep 202280 19257— 10 
Average exchange rate for the quarters ended 31 December 2022 and 30 September 2022 was R17.61/US$ and 17.05/US$, respectively
Figures may not add as they are rounded independently
1Operating cost is the average cost of production and operating cost per tonne is calculated by dividing the cost of sales, before amortisation and depreciation and change in inventory in a period by the tonnes milled/treated in the same period, and operating cost per kilogram (and ounce) is calculated by dividing the cost of sales, before amortisation and depreciation and change in inventory in a period by the gold produced in the same period
2All-in cost is calculated in accordance with the World Gold Council guidance. All-in cost excludes income tax, costs associated with merger and acquisition activities, working capital, impairments, financing costs, one time severance charges and items needed to normalise earnings. All-in cost is made up of All-in sustaining cost, being the cost to sustain current operations, given as a sub-total in the All-in cost calculation, together with corporate and major capital expenditure associated with growth. All-in sustaining cost per kilogram (and ounce) and All-in cost per kilogram (and ounce) are calculated by dividing the All-in sustaining cost and All-in cost, respectively, in a period by the total gold sold over the same period. For a reconciliation of cost of sales before amortisation and depreciation to All-in cost, see “All-in costs – Quarters”
3Corporate project expenditure, which comprises spend on various Corporate IT projects and the Burnstone project, for the quarters ended 31 December 2022 and 30 September 2022 was R308 million (US$17 million) and R330 million (US$19 million), respectively

Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 65


European operations

Sibanye-Stillwater Sandouville refinery
Battery metal split
Dec 2022Sep 2022
Volumes produced (tonnes)%%
Nickel Salts1
287 46 %650 39 %
Nickel Metal337 54 %1,003 61 %
Total Nickel production tNi624 100 %1,653 100 %
Nickel Cakes2
23 68
Cobalt Chloride (CoCl2)3
6 37
Ferric Chloride (FeCl3)3
110 321
Volumes sales (tonnes)
Nickel Salts1
347 62 %529 31 %
Nickel Metal211 38 %1,177 69 %
Total Nickel sold tNi558 100 %1,706 100 %
Cobalt Chloride (CoCl2)3
(32)51
Ferric Chloride (FeCl3)3
110 321


Nickel equivalent basket priceUnitDec 2022Sep 2022
Nickel equivalent average basket priceR/tNi557,348 384,525 
US$/tNi31,649 22,553 


Nickel equivalent sustaining costUnitDec 2022Sep 2022
Cost of sales, before amortisation and depreciationRm624 882 
Carbon taxRm— — 
Community costsRm— — 
Share-based paymentsRm— — 
Rehabilitation interest and amortisationRm1 1 
LeasesRm(13)15 
Sustaining capital expenditureRm37 23 
Less: By-product creditRm(25)(43)
Nickel equivalent sustaining costRm624 878 
Nickel products soldtNi558 1,706 
Nickel equivalent sustaining costR/tNi1,118,280 514,654 
US$/tNi63,503 30,185 
Nickel recovery yield4
%89.53 %95.04 %
Average exchange rate for the quarters ended 31 December 2022 and 30 September 2022 was R17.61/US$ and 17.05/US$, respectively
Figures may not add as they are rounded independently

1Nickel salts consist of anhydrous nickel, nickel chloride low sodium, nickel chloride standard, nickel carbonate and nickel chloride solution
2Nickel cakes occur during the processing of nickel matte and are recycled back into the nickel refining process
3Cobalt chloride and ferric chloride are obtained from nickel matte through a different refining process on an order basis
4Nickel recovery yield is the percentage of total nickel recovered from the matte relative to the nickel contained in the matte received

Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 66



ALL-IN COSTS - QUARTERS
US and SA PGM operations
US
OPERATIONS
SA OPERATIONS
R' million
Total US and SA PGM1
Total US PGM2
Total SA PGM1
Rustenburg
Marikana1
KroondalPlat MileMimosaCorporate
Cost of sales, before amortisation and depreciation3
Dec 20229,700 2,203 7,497 3,670 2,772 905 150 535 (535)
Sep 20229,416 1,413 8,003 3,218 3,758 868 159 511 (511)
RoyaltiesDec 2022444 — 444 307 134 3 — 31 (31)
Sep 2022374 — 374 258 112 4 — 26 (26)
Carbon taxDec 2022— — — — — — — — — 
Sep 2022(1)— (1)— — (1)— — — 
Community costsDec 202227 — 27 — 27 — — — — 
Sep 202222 — 22 — 22 — — — — 
Inventory changeDec 20221,642 40 1,602 (29)1,631 — — 4 (4)
Sep 20221,462 398 1,064 375 689 — — (3)3 
Share-based payments4
Dec 202279 44 35 14 22 (2)— — — 
Sep 202254 12 42 16 19 7 — — — 
Rehabilitation interest and amortisation5
Dec 202249 13 36 (5)15 26 — 1 (1)
Sep 202235 13 22 (8)10 20 — 1 (1)
LeasesDec 202215 2 13 3 9 1 — — — 
Sep 202216 2 14 3 10 1 — — — 
Ore reserve developmentDec 20221,481 887 594 178 416 — — — — 
Sep 20221,313 723 590 194 396 — — — — 
Sustaining capital expenditureDec 20221,288 513 775 245 439 78 13 313 (313)
Sep 2022758 293 465 140 242 80 3 258 (258)
Less: By-product creditDec 2022(2,218)(271)(1,947)(979)(814)(131)(23)(179)179 
Sep 2022(2,327)(196)(2,131)(888)(981)(238)(23)(190)189 
Total All-in-sustaining costs6
Dec 202212,507 3,431 9,076 3,404 4,651 880 140 705 (705)
Sep 202211,122 2,658 8,464 3,308 4,277 741 139 603 (604)
Plus: Corporate cost, growth and capital expenditureDec 2022695 381 314 (1)315 — — — — 
Sep 2022642 434 208 1 207 — — — — 
Total All-in-costs6
Dec 202213,202 3,812 9,390 3,403 4,966 880 140 705 (705)
Sep 202211,764 3,092 8,672 3,309 4,484 741 139 603 (604)
PGM production4Eoz - 2EozDec 2022537,998 105,205 432,793 144,587 195,336 52,321 11,239 29,310 — 
Sep 2022534,752 85,889 448,863 179,438 180,316 48,120 12,319 28,670 — 
kgDec 202216,734 3,272 13,461 4,497 6,076 1,627 350 912 — 
Sep 202216,633 2,671 13,961 5,581 5,608 1,497 383 892 — 
All-in-sustaining costR/4Eoz - R/2EozDec 202224,587 32,613 22,494 23,543 23,810 16,819 12,457 24,053 — 
Sep 202221,977 30,947 20,143 18,435 23,719 15,399 11,283 21,032 — 
US$/4Eoz - US$/2EozDec 20221,396 1,852 1,277 1,337 1,352 955 707 1,366 — 
Sep 20221,289 1,815 1,181 1,081 1,391 903 662 1,234 — 
All-in-costR/4Eoz - R/2EozDec 202225,953 36,234 23,272 23,536 25,423 16,819 12,457 24,053 — 
Sep 202223,245 36,000 20,638 18,441 24,867 15,399 11,283 21,032 — 
US$/4Eoz - US$/2EozDec 20221,474 2,058 1,322 1,337 1,444 955 707 1,366 — 
Sep 20221,363 2,111 1,210 1,082 1,459 903 662 1,234 — 
Average exchange rate for the quarters ended 31 December 2022 and 30 September 2022 was R17.61/US$ and R17.05/US$, respectively
Figures may not add as they are rounded independently
1The Total US and SA PGM, Total SA PGM and Marikana includes the production and costs associated with the purchase of concentrate (PoC) from third parties. For a reconciliation of the Operating cost, AISC and AIC excluding third party PoC, refer to “Reconciliation of operating cost excluding third party PoC for Total US and SA PGM, Total SA PGM and Marikana - Quarters” and “Reconciliation of AISC and AIC excluding third party PoC for Total US and SA PGM, Total SA PGM and Marikana – Quarters”
2The US PGM operations’ underground production is converted to metric tonnes and kilograms, and performance is translated into SA rand. In addition to the US PGM operations’ underground production, the operation processes various recycling material which is excluded from the 2E PGM production, All-in sustaining cost and All-in cost statistics shown
3Cost of sales, before amortisation and depreciation includes all mining and processing costs, third party refining costs, corporate general and administrative costs, and permitting costs
4Share-based payments are calculated based on the fair value at initial recognition and do not include the adjustment of the cash-settled share-based payment obligation to the reporting date fair value
5Rehabilitation includes the interest charge related to the environmental rehabilitation obligation and the amortisation of the related capitalised rehabilitation costs. The interest charge related to the environmental rehabilitation obligation and the amortisation of the capitalised rehabilitation costs reflect the periodic costs of rehabilitation associated with current PGM production
6All-in cost is calculated in accordance with the World Gold Council guidance. All-in cost excludes income tax, costs associated with merger and acquisition activities, working capital, impairments, financing costs, one-time severance charges and items needed to normalise earnings. All-in cost is made up of All-in sustaining cost, being the cost to sustain current operations, given as a sub-total in the All-in cost calculation, together with corporate and major capital expenditure associated with growth. All-in sustaining cost per ounce (and kilogram) and All-in cost per ounce (and kilogram) are calculated by dividing the All-in sustaining cost and All-in cost, respectively, in a period by the total 4E/2E PGM produced in the same period

Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 67


Reconciliation of operating cost excluding third party PoC for Total US and SA PGM, Total SA PGM and Marikana - Quarters
Total US and SA PGMTotal SA PGMMarikana
R' millionDec 2022Sep 2022Dec 2022Sep 2022Dec 2022Sep 2022
Cost of sales, before amortisation and depreciation as reported per table above9,700 9,416 7,497 8,003 2,772 3,758 
Inventory change as reported per table above1,642 1,462 1,602 1,064 1,631 689 
Less: Chrome cost of sales(349)(402)(349)(402)(67)(96)
Total operating cost including third party PoC10,993 10,476 8,750 8,665 4,336 4,351 
Less: Purchase cost of PoC(849)(790)(849)(790)(849)(790)
Total operating cost excluding third party PoC10,144 9,686 7,901 7,875 3,487 3,561 
PGM production as reported per table above4Eoz- 2Eoz537,998 534,752 432,793 448,863 195,336 180,316 
Less: Mimosa production(29,310)(28,670)(29,310)(28,670)— — 
PGM production excluding Mimosa508,688 506,082 403,483 420,193 195,336 180,316 
Less: PoC production(21,278)(16,720)(21,278)(16,720)(21,278)(16,720)
PGM production excluding Mimosa and third party PoC487,410 489,362 382,205 403,473 174,058 163,596 
PGM production including Mimosa and excluding third party PoC516,720 518,032 411,515 432,143 174,058 163,596 
Tonnes milled/treated000't9,242 9,625 8,956 9,383 2,552 2,441 
Less: Mimosa tonnes(347)(340)(347)(340)— — 
PGM tonnes excluding Mimosa and third party PoC8,895 9,284 8,608 9,043 2,552 2,441 
Operating cost including third party PoCR/4Eoz-R/2Eoz21,610 20,700 21,686 20,621 22,198 24,130 
US$/4Eoz-US$/2Eoz1,227 1,214 1,231 1,209 1,261 1,415 
R/t1,236 1,128 1,016 958 1,699 1,782 
US$/t70 66 58 56 96 105 
Operating cost excluding third party PoCR/4Eoz-R/2Eoz20,812 19,793 20,672 19,518 20,034 21,767 
US$/4Eoz-US$/2Eoz1,182 1,161 1,174 1,145 1,138 1,277 
R/t1,140 1,043 918 871 1,366 1,459 
US$/t65 61 52 51 78 86 

Reconciliation of AISC and AIC excluding third party PoC for Total US and SA PGM, Total SA PGM and Marikana - Quarters
Total US and SA PGMTotal SA PGMMarikana
R' millionDec 2022Sep 2022Dec 2022Sep 2022Dec 2022Sep 2022
Total All-in-sustaining cost as reported per table above12,507 11,122 9,076 8,464 4,651 4,277 
Less: Purchase cost of PoC(849)(790)(849)(790)(849)(790)
Add: By-product credit of PoC72 77 72 77 72 77 
Total All-in-sustaining cost excluding third party PoC11,730 10,409 8,299 7,751 3,874 3,564 
Plus: Corporate cost, growth and capital expenditure695 642 314 208 315 207 
Total All-in-cost excluding third party PoC12,425 11,051 8,613 7,959 4,189 3,771 
PGM production excluding Mimosa and third party PoC4Eoz- 2Eoz487,410 489,362 382,205 403,473 174,058 163,596 
All-in-sustaining cost excluding third party PoCR/4Eoz-R/2Eoz24,066 21,271 21,713 19,211 22,257 21,785 
US$/4Eoz-US$/2Eoz1,367 1,248 1,233 1,127 1,264 1,278 
All-in-cost excluding third party PoCR/4Eoz-R/2Eoz25,492 22,582 22,535 19,726 24,067 23,051 
US$/4Eoz-US$/2Eoz1,448 1,324 1,280 1,157 1,367 1,352 
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 68



SA gold operations
SA OPERATIONS
R' millionTotal SA goldDriefonteinKloofBeatrixCookeDRDGOLDCorporate
Cost of sales, before amortisation and depreciation1
Dec 20225,274 1,427 1,638 1,005 240 964 — 
Sep 20226,342 1,562 1,926 1,624 256 974 — 
RoyaltiesDec 202224 8 9 6 1 — — 
Sep 202221 7 7 6 1 — — 
Carbon taxDec 20221 — — 1 — — — 
Sep 20221 — — 1 — — — 
Community costsDec 20223 — — — — 3 — 
Sep 202224 8 7 6 — 3 — 
Share-based payments2
Dec 202245 12 16 11 — 6 — 
Sep 202228 10 9 5 — 4 — 
Rehabilitation interest and amortisation3
Dec 202237 (10)(11)15 16 4 23 
Sep 202232 5 (3)15 11 4 — 
LeasesDec 202217 1 4 7 — 5 — 
Sep 202219 2 4 7 — 6 — 
Ore reserve developmentDec 2022691 334 262 95 — — — 
Sep 2022472 208 174 90 — — — 
Sustaining capital expenditureDec 2022480 154 153 50 — 123 — 
Sep 2022409 109 150 37 — 113 — 
Less: By-product creditDec 2022(4)(2)(1)(1)— — — 
Sep 2022(3)(1)(1)(1)— — — 
Total All-in-sustaining costs4
Dec 20226,568 1,924 2,070 1,189 257 1,105 23 
Sep 20227,345 1,910 2,273 1,790 268 1,104 — 
Plus: Corporate cost, growth and capital expenditureDec 2022439 — 50 — — 65 324 
Sep 2022505 — 105 — — 53 347 
Total All-in-costs4
Dec 20227,007 1,924 2,120 1,189 257 1,170 347 
Sep 20227,850 1,910 2,378 1,790 268 1,157 347 
Gold soldkgDec 20226,308 1,576 1,831 1,286 295 1,320 — 
Sep 20226,070 1,572 1,488 1,257 311 1,442 — 
ozDec 2022202,807 50,670 58,868 41,346 9,484 42,439 — 
Sep 2022195,155 50,541 47,840 40,413 9,999 46,361 — 
All-in-sustaining costR/kgDec 20221,041,218 1,220,812 1,130,530 924,572 871,186 837,121 — 
Sep 20221,210,049 1,215,013 1,527,554 1,424,025 861,736 765,603 — 
All-in-sustaining costUS$/ozDec 20221,839 2,156 1,997 1,633 1,539 1,479 — 
Sep 20222,207 2,216 2,787 2,598 1,572 1,397 — 
All-in-costR/kgDec 20221,110,812 1,220,812 1,157,837 924,572 871,186 886,364 — 
Sep 20221,293,245 1,215,013 1,598,118 1,424,025 861,736 802,358 — 
All-in-costUS$/ozDec 20221,962 2,156 2,045 1,633 1,539 1,566 — 
Sep 20222,359 2,216 2,915 2,598 1,572 1,464 — 
Average exchange rate for the quarters ended 31 December 2022 and 30 September 2022 was R17.61/US$ and R17.05/US$, respectively
Figures may not add as they are rounded independently
1Cost of sales, before amortisation and depreciation includes all mining and processing costs, third party refining costs, corporate general and administrative costs, and permitting costs
2Share-based payments are calculated based on the fair value at initial recognition and do not include the adjustment of the cash-settled share-based payment obligation to the reporting date fair value
3Rehabilitation includes the interest charge related to the environmental rehabilitation obligation and the amortisation of the related capitalised rehabilitation costs. The interest charge related to the environmental rehabilitation obligation and the amortisation of the capitalised rehabilitation costs reflect the periodic costs of rehabilitation associated with current gold production
4All-in cost is calculated in accordance with the World Gold Council guidance. All-in cost excludes income tax, costs associated with merger and acquisition activities, working capital, impairments, financing costs, one time severance charges and items needed to normalise earnings. All-in cost is made up of All-in sustaining cost, being the cost to sustain current operations, given as a sub-total in the All-in cost calculation, together with corporate and major capital expenditure associated with growth. All-in sustaining cost per kilogram (and ounce) and All-in cost per kilogram (and ounce) are calculated by dividing the All-in sustaining cost and All-in cost, respectively, in a period by the total gold sold over the same period







Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 69


DEVELOPMENT RESULTS
Development values represent the actual results of sampling and no allowance has been made for any adjustments which may be necessary when estimating ore reserves. All figures below exclude shaft sinking metres, which are reported separately where appropriate.

US PGM operations
Quarter endedDec 2022Sep 2022Year ended 31 December 2022
ReefStillwater incl Blitz East BoulderStillwater incl Blitz East BoulderStillwater incl BlitzEast Boulder
Total US PGMUnit
Primary development (off reef)(m)1,297 299 1,405 269 6,130 1,441 
Secondary development (m)3,262 1,521 3,508 1,196 12,423 5,298 

SA PGM operations
Quarter endedDec 2022Sep 2022Year ended 31 December 2022
ReefBatho-peleThembe-laniKhuse-lekaSiphume-leleBatho-peleThembe-laniKhuse-lekaSiphume-leleBatho-peleThembe-laniKhuse-lekaSiphume-lele
RustenburgUnit
Advanced(m)415 1,379 2,976 726 443 1,877 3,273 738 1,605 6,343 11,483 2,734 
Advanced on reef(m)415 588 1,056 358 443 696 1,277 403 1,605 2,643 4,354 1,417 
Height(cm)217 291 281 265 220 295 282 285 215 294 283 275 
Average value(g/t)3.02.32.32.92.92.32.22.92.92.32.22.9
(cm.g/t)655 674 632 754 632 670 630 815 633 686 621 809 
SA PGM operations
Quarter endedDec 2022Sep 2022Year ended 31 December 2022
ReefK3RowlandSaffyE34BK4K3RowlandSaffyE34BK4K3RowlandSaffyE34BK4
MarikanaUnit
Primary development (m)8,230 3,975 3,585 770 926 2,876 8,996 4,263 3,953 867 914 2,317 32,438 17,806 14,708 3,066 3,597 6,130 
Primary development - on reef(m)6,084 2,558 1,868 401 706 960 6,687 2,532 2,390 455 556 759 24,231 11,624 8,686 1,581 2,451 1,890 
Height(cm)216 219 237 222 219 240 217 219 238 230 214 239 216 219 233 222 219 239 
Average value(g/t)2.72.52.42.92.82.52.52.52.42.63.02.82.72.62.42.82.92.6
(cm.g/t)585 543 575 632 620 596 534 557 579 591 638 666 580 562 570 616 629 622 
SA PGM operations
Quarter endedDec 2022Sep 2022Year ended 31 December 2022
ReefKopa-nengBamba-naniKweziK6Kopa-nengBamba-naniKweziK6Kopa-nengBamba-naniKweziK6
KroondalUnit
Advanced(m)538 774 576 450 586 789 531 556 2,129 2,940 2,162 1,611 
Advanced on reef(m)436 452 521 431 436 271 420 478 1,509 1,535 1,401 1,322 
Height(cm)239 224 218 232 242 214 223 240 239 217 219 239 
Average value(g/t)2.0 1.5 2.2 2.3 1.6 1.0 2.2 2.0 1.6 1.5 1.7 1.8 
(cm.g/t)475 338 470 528 381 210 480 480 381 315 368 429 

Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 70



SA gold operations
Quarter endedDec 2022Sep 2022Year ended 31 December 2022
ReefCarbon
leader
MainVCRCarbon
leader
MainVCRCarbon
leader
MainVCR
DriefonteinUnit
Advanced(m)823  433  1,018  443  223  610  1,942  949  2,587  
Advanced on reef(m)28  75  205  40  74  172  186  239  635  
Channel width(cm)17  64  49  16  56  48  20  59  58  
Average value(g/t)54.7  5.2  37.9  42.5  7.4  35.6  39.7  8.0  42.1  
(cm.g/t)918  329  1,841  666  414  1,707  800  474  2,448  
SA gold operations
Quarter endedDec 2022Sep 2022Year ended 31 December 2022
ReefKloofMainLibanonVCRKloofMainLibanonVCRKloofMainLibanonVCR
KloofUnit
Advanced(m)1,131  601  57  1,020  901  362  45  604  3,030  1,338  121  2,464  
Advanced on reef(m)345  127  57  155  259  84  45  103  870  313  121  380  
Channel width(cm)131  58  95  95  162  73  88  83  144  75  95  93  
Average value(g/t)9.5  11.3  2.0  16.0  10.9  10.3  2.9  16.7  11.0  10.8  2.4  15.3  
(cm.g/t)1,247  652  194  1,510  1,766  755  253  1,397  1,589  813  229  1,419  
SA gold operations
Quarter endedDec 2022Sep 2022Year ended 31 December 2022
ReefBeatrixKalkoen-kransBeatrixKalkoen-kransBeatrixKalkoen-krans
BeatrixUnit
Advanced(m)2,503  110  1,640  65  4,929  227  
Advanced on reef(m)740  9  500  —  1,470  9  
Channel width(cm)147  68  151  —  146  68  
Average value(g/t)6.5  30.3  7.6  —  7.2  30.3  
(cm.g/t)964  2,060  1,143  —  1,053  2,060  
SA gold operations
Quarter endedDec 2022Sep 2022Year ended 31 December 2022
ReefKimberleyKimberleyKimberley
BurnstoneUnit
Advanced(m)305 223 566 
Advanced on reef(m)12 — 12 
Channel width(cm)28 — 28 
Average value(g/t)10.7 — 10.7 
(cm.g/t)300 — 300 
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 71


ADMINISTRATION AND CORPORATE INFORMATION
SIBANYE STILLWATER LIMITED
(SIBANYE-STILLWATER)
Incorporated in the Republic of South Africa
Registration number 2014/243852/06
Share code: SSW and SBSW
Issuer code: SSW
ISIN: ZAE000259701
LISTINGS
JSE: SSW
NYSE: SBSW
WEBSITE
websitejpga.jpg www.sibanyestillwater.com
REGISTERED AND CORPORATE OFFICE
Constantia Office Park
Bridgeview House, Building 11, Ground floor,
Cnr 14th Avenue & Hendrik Potgieter Road
Weltevreden Park 1709
South Africa
Private Bag X5
Westonaria 1780
South Africa
Tel: +27 11 278 9600
Fax: +27 11 278 9863


COMPANY SECRETARY
Lerato Matlosa
Email: lerato.matlosa@sibanyestillwater.com
DIRECTORS
Dr Vincent Maphai* (Chairman)
Neal Froneman (CEO)
Charl Keyter (CFO)
Dr Elaine Dorward-King*
Harry Kenyon-Slaney*
Jeremiah Vilakazi*
Keith Rayner*
Nkosemntu Nika*
Richard Menell*^
Savannah Danson*
Susan van der Merwe*
Timothy Cumming*
Sindiswa Zilwa*
* Independent non-executive
^ Lead independent director

INVESTOR ENQUIRIES
James Wellsted
Executive Vice President: Investor Relations and Corporate Affairs
Mobile: +27 83 453 4014
Email: james.wellsted@sibanyestillwater.com
or ir@sibanyestillwater.com
JSE SPONSOR
JP Morgan Equities South Africa Proprietary Limited
Registration number 1995/011815/07
1 Fricker Road
Illovo
Johannesburg 2196
South Africa
Private Bag X9936
Sandton 2146
South Africa
AUDITORS
Ernst & Young Inc. (EY)
102 Rivonia Road
Sandton 2196
South Africa
Private Bag X14
Sandton 2146
South Africa
Tel: +27 11 772 3000
AMERICAN DEPOSITARY RECEIPTS
TRANSFER AGENT
BNY Mellon Shareowner Correspondence (ADR)
Mailing address of agent:
Computershare
PO Box 43078
Providence, RI 02940-3078

Overnight/certified/registered delivery:
Computershare
150 Royall Street, Suite 101
Canton, MA 02021

US toll free: + 1 888 269 2377
Tel: +1 201 680 6825
Email: shrrelations@cpushareownerservices.com
Tatyana Vesselovskaya
Relationship Manager - BNY Mellon
Depositary Receipts
Email: tatyana.vesselovskaya@bnymellon.com
TRANSFER SECRETARIES SOUTH AFRICA
Computershare Investor Services Proprietary Limited
Rosebank Towers15 Biermann Avenue
Rosebank 2196
PO Box 61051
Marshalltown 2107
South Africa
Tel: +27 11 370 5000
Fax: +27 11 688 5248
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 72


DISCLAIMER
FORWARD LOOKING STATEMENTS
The information in this document may contain forward-looking statements within the meaning of the “safe harbour” provisions of the United States Private Securities Litigation Reform Act of 1995. These forward-looking statements, including, among others, those relating to Sibanye Stillwater Limited’s (Sibanye-Stillwater or the Group) financial positions, business strategies, plans and objectives of management for future operations, are necessarily estimates reflecting the best judgment of the senior management and directors of Sibanye-Stillwater and involve a number of risks and uncertainties that could cause actual results to differ materially from those suggested by the forward-looking statements. As a consequence, these forward-looking statements should be considered in light of various important factors, including those set forth in this announcement.

All statements other than statements of historical facts included in this document may be forward-looking statements. Forward-looking statements also often use words such as “will”, “would”, “expect”, “forecast”, “potential”, “may”, “could”, “believe”, “aim”, “anticipate”, “target”, “estimate” and words of similar meaning. By their nature, forward-looking statements involve risk and uncertainty because they relate to future events and circumstances and should be considered in light of various important factors, including those set forth in this disclaimer. Readers are cautioned not to place undue reliance on such statements.

The important factors that could cause Sibanye-Stillwater’s actual results, performance or achievements to differ materially from estimates or projections contained in the forward-looking statements include, without limitation, Sibanye-Stillwater’s future financial position, plans, strategies, objectives, capital expenditures, projected costs and anticipated cost savings, financing plans, debt position and ability to reduce debt leverage; economic, business, political and social conditions in South Africa, Zimbabwe, the United States and elsewhere; plans and objectives of management for future operations; Sibanye-Stillwater’s ability to obtain the benefits of any streaming arrangements or pipeline financing; the ability of Sibanye-Stillwater to comply with loan and other covenants and restrictions and difficulties in obtaining additional financing or refinancing; Sibanye-Stillwater’s ability to service its bond instruments; changes in assumptions underlying Sibanye-Stillwater’s estimation of its Mineral Resources and Mineral Reserves; any failure of a tailings storage facility; the ability to achieve anticipated efficiencies and other cost savings in connection with, and the ability to successfully integrate, past, ongoing and future acquisitions, as well as at existing operations; the ability of Sibanye-Stillwater to complete any ongoing or future acquisitions; the success of Sibanye-Stillwater’s business strategy and exploration and development activities, including any proposed, anticipated or planned expansions into the battery metals or adjacent sectors and estimations or expectations of enterprise value (including the Rhyolite Ridge project); the ability of Sibanye-Stillwater to comply with requirements that it operate in ways that provide progressive benefits to affected communities; changes in the market price of gold, PGMs, battery metals (e.g., nickel, lithium, copper and zinc) and the cost of power, petroleum fuels, and oil, among other commodities and supply requirements; the occurrence of hazards associated with underground and surface mining; any further downgrade of South Africa’s credit rating; the impact of South Africa's greylisting; a challenge regarding the title to any of Sibanye-Stillwater’s properties by claimants to land under restitution and other legislation; Sibanye-Stillwater’s ability to implement its strategy and any changes thereto; the outcome of legal challenges to the Group’s mining or other land use rights; the occurrence of labour disputes, disruptions and industrial actions; the availability, terms and deployment of capital or credit; changes in the imposition of industry standards, regulatory costs and relevant government regulations, particularly environmental, sustainability, tax, health and safety regulations and new legislation affecting water, mining, mineral rights and business ownership, including any interpretation thereof which may be subject to dispute; the outcome and consequence of any potential or pending litigation or regulatory proceedings, including in relation to any environmental, health or safety issues; failure to meet ethical standards, including actual or alleged instances of fraud, bribery or corruption; the effect of climate change or other extreme weather events on Sibanye-Stillwater’s business; the concentration of all final refining activity and a large portion of Sibanye-Stillwater’s PGM sales from mine production in the United States with one entity; the identification of a material weakness in disclosure and internal controls over financial reporting; the effect of US tax reform legislation on Sibanye-Stillwater and its subsidiaries; the effect of South African Exchange Control Regulations on Sibanye-Stillwater’s financial flexibility; operating in new geographies and regulatory environments where Sibanye-Stillwater has no previous experience; power disruptions, constraints and cost increases; supply chain disruptions and shortages and increases in the price of production inputs; the regional concentration of Sibanye-Stillwater’s operations; fluctuations in exchange rates, currency devaluations, inflation and other macro-economic monetary policies; the occurrence of temporary stoppages or precautionary suspension of operations at its mines for safety or environmental incidents (including natural disasters) and unplanned maintenance; Sibanye-Stillwater’s ability to hire and retain senior management and employees with sufficient technical and/or production skills across its global operations necessary to meet its labour recruitment and retention goals, as well as its ability to achieve sufficient representation of historically disadvantaged South Africans in its management positions; failure of Sibanye-Stillwater’s information technology, communications and systems; the adequacy of Sibanye-Stillwater’s insurance coverage; social unrest, sickness or natural or man-made disaster at informal settlements in the vicinity of some of Sibanye-Stillwater’s South African-based operations; and the impact of HIV, tuberculosis and the spread of other contagious diseases, such as the coronavirus disease (COVID-19).

Further details of potential risks and uncertainties affecting Sibanye-Stillwater are described in Sibanye-Stillwater’s filings with the Johannesburg Stock Exchange and the United States Securities and Exchange Commission, including the 2021 Integrated Report and the annual report on Form 20-F for the fiscal year ended 31 December 2021 (SEC File no. 333-234096).

These forward-looking statements speak only as of the date of the content. Sibanye-Stillwater expressly disclaims any obligation or undertaking to update or revise any forward-looking statement (except to the extent legally required). These forward-looking statements have not been reviewed or reported on by the Group’s external auditors.

NON-IFRS MEASURES
The information contained in this document may contain certain non-IFRS measures, including adjusted EBITDA, AISC, AIC and Nickel equivalent sustaining cost. These measures may not be comparable to similarly-titled measures used by other companies and are not measures of Sibanye-Stillwater’s financial performance under IFRS. These measures should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Sibanye-Stillwater is not providing a reconciliation of the forecast non-IFRS financial information presented in this report because it is unable to provide this reconciliation without unreasonable effort. These forecast non-IFRS financial information presented have not been reviewed or reported on by the Group’s external auditors.

Mineral Resources and Mineral Reserves
Sibanye-Stillwater’s Mineral Resources and Mineral Reserves are estimates at a particular date, and are affected by fluctuations in mineral prices, the exchange rates, operating costs, mining permits, changes in legislation and operating factors. Sibanye-Stillwater reports its Mineral Resources and Mineral Reserves in accordance with the rules and regulations promulgated by each of the United States Securities and Exchange Commission (SEC) and the JSE at all managed operations, development, and exploration properties. Sibanye-Stillwater expects to file the information required by Subpart 1300 of Regulation S-K under the Securities Act of 1933, including a Technical Report Summary in respect of the Keliber project, with its annual report on Form 20-F for the year ended 31 December 2022.

WEBSITES
References in this document to information on websites (and/or social media sites) are included as an aid to their location and such information is not incorporated in, and does not form part of, this report.
Sibanye-Stillwater Operating and financial results | Six months and year ended 31 December 2022 73