WHEATON PRECIOUS METALS CORP.
|
||||
|
November 7, 2024
|
By:
|
/s/ Curt Bernardi
|
||
|
Name:
|
Curt Bernardi
|
|||
|
Title:
|
Senior Vice President, Legal
|
|||
|
and Strategic Development
|
||||
| 99.1 |
| 99.2 |
| 99.3 |
| 99.4 |
| 99.5 |
| 99.6 |
| 99.7 |
| 99.8 |

| • |
Third quarter of 2024: $308 million in revenue, $254 million in operating cash flow, $155 million in net earnings and $153 million in adjusted net earnings1, and declared a quarterly
dividend1 of $0.155 per common share.
|
| • |
Balance Sheet: cash balance of $694 million, no debt, and an undrawn $2 billion revolving credit facility as at September 30, 2024 after making total upfront cash payments of $30 million relative to
mineral stream and royalty interests in the quarter.
|
| • |
Streaming and royalty agreements on 18 operating mines and 28 development projects5, including the addition of the Koné project announced subsequent to the quarter.
|
| • |
93% of attributable production from assets in the lowest half of their respective cost curves2,4.
|
| • |
Attributable gold equivalent production3 (“GEOs”) of 144,200 ounces in the third quarter of 2024 and 448,400 for the first nine months of 2024, with quarterly production consistent with the
comparable period of the prior year, as lower production from Salobo and Constancia was largely offset by higher production from Peñasquito.
|
| • |
Average annual forecast production guidance for 2024 of 550,000 to 620,000 GEOs3 maintained, with forecasted sector-leading growth to over 800,000 GEOs3 by 2028, and average
annual forecast attributable production growing to over 850,000 GEOs3 in years 2029 to 2033.
|
| • |
Further de-risked forecast growth profile as construction activities advanced at the Blackwater, Goose, Platreef, and Mineral Park projects, all of which are expected to be producing within the next
12 months.
|
|
|
| • |
Subsequent to the quarter, the Company announced two accretive precious metals streaming agreements:
|
| o |
On October 23, 2024, the Company entered into a precious metals purchase agreement (“PMPA”) with Montage Gold Corp. in respect to the Koné Gold Project located in Côte d’Ivoire.
|
| o |
On October 21, 2024, the Company amended the Fenix PMPA, increasing the amount of attributable gold it is entitled to under the contract.
|
| • |
Top Rankings: One of the top-rated companies by Sustainalytics, AA rated by MSCI, and Prime rated by ISS.
|
| • |
Launch of inaugural Future of Mining Challenge, which will award US$1 million to a winning venture to advance their technology aimed at minimizing environmental impacts, improving efficiencies, and
contributing to climate solutions, while ensuring key resources are responsibly available for future generations.
|
|
(all figures in US dollars unless otherwise noted)
|
|
|
Q3 2024
|
|
|
Q3 2023
|
|
Change
|
|
|
YTD 2024
|
|
|
YTD 2023
|
|
|
Change
|
|
Units produced
|
|
|
|
|
|
|
|
|
|||||||||
|
Gold ounces
|
|
|
87,199
|
|
105,027
|
(17.0)%
|
|
|
262,698
|
|
261,226
|
0.6 %
|
|||||
|
Silver ounces
|
|
|
4,554
|
|
3,397
|
34.1 %
|
|
|
15,083
|
|
12,985
|
16.2 %
|
|||||
|
Palladium ounces
|
|
|
4,034
|
|
4,006
|
0.7 %
|
|
|
12,835
|
|
11,591
|
10.7 %
|
|||||
|
Cobalt pounds
|
|
|
397
|
|
183
|
117.6 %
|
|
|
896
|
|
458
|
95.5 %
|
|||||
|
Gold equivalent ounces 3
|
|
|
144,164
|
|
147,278
|
(2.1)%
|
|
|
448,388
|
|
419,330
|
6.9 %
|
|||||
|
Units sold
|
|
|
|
|
|
|
|
|
|||||||||
|
Gold ounces
|
|
|
75,694
|
|
74,426
|
1.7 %
|
|
|
245,039
|
|
212,325
|
15.4 %
|
|||||
|
Silver ounces
|
|
|
3,875
|
|
2,965
|
30.7 %
|
|
|
11,765
|
|
11,151
|
5.5 %
|
|||||
|
Palladium ounces
|
|
|
3,761
|
|
4,242
|
(11.3)%
|
|
|
12,836
|
|
10,580
|
21.3 %
|
|||||
|
Cobalt pounds
|
|
|
88
|
|
198
|
(55.6)%
|
|
|
485
|
|
786
|
(38.3)%
|
|||||
|
Gold equivalent ounces 3
|
|
|
122,715
|
|
111,935
|
9.6 %
|
|
|
389,907
|
|
350,961
|
11.1 %
|
|||||
|
Change in PBND and Inventory
|
|
|
|
|
|
|
|
|
|||||||||
|
Gold equivalent ounces 3
|
|
|
9,267
|
|
|
21,869
|
|
12,602
|
|
|
17,989
|
|
|
20,020
|
|
|
2,031
|
|
Revenue
|
|
$
|
308,253
|
|
$
|
223,137
|
38.1 %
|
|
$
|
904,123
|
|
$
|
702,573
|
28.7 %
|
|||
|
Net earnings
|
|
$
|
154,635
|
|
$
|
116,371
|
32.9 %
|
|
$
|
440,993
|
|
$
|
369,209
|
19.4 %
|
|||
|
Per share
|
|
$
|
0.341
|
|
$
|
0.257
|
32.7 %
|
|
$
|
0.973
|
|
$
|
0.815
|
19.4 %
|
|||
|
Adjusted net earnings 1
|
|
$
|
152,803
|
|
$
|
121,467
|
25.8 %
|
|
$
|
441,201
|
|
$
|
368,481
|
19.7 %
|
|||
|
Per share 1
|
|
$
|
0.337
|
|
$
|
0.268
|
25.7 %
|
|
$
|
0.973
|
|
$
|
0.814
|
19.5 %
|
|||
|
Operating cash flows
|
|
$
|
254,337
|
|
$
|
171,103
|
48.6 %
|
|
$
|
708,110
|
|
$
|
508,584
|
39.2 %
|
|||
|
Per share 1
|
|
$
|
0.561
|
|
$
|
0.378
|
|
48.4 %
|
|
$
|
1.562
|
|
$
|
1.123
|
|
|
39.1 %
|
| • |
Approximately $694 million of cash on hand
|
| • |
During the third quarter of 2024, the Company made total upfront cash payments of $30 million relative to the mineral stream and royalty interests consisting of:
|
| o |
$25 million relative to the Mineral Park PMPA; and
|
| o |
$5 million relative to the DeLamar Royalty.
|
| • |
With the existing cash on hand coupled with the fully undrawn $2 billion revolving credit facility, the Company believes it is well positioned to fund all outstanding commitments and known
contingencies as well as providing flexibility to acquire additional accretive mineral stream interests.
|
| • |
Wheaton’s Partner Community Investment Program continues to support initiatives with the Vale Foundation, Vale Canada, Glencore via Antamina, Hudbay Minerals, First Majestic Silver and
Sibanye-Stillwater to support the communities influenced by the mines and provide vital services and programs including educational resources, health and dental programs, poverty reduction initiatives, entrepreneurial opportunities, and
various social and environmental programs.
|
| • |
In August 2024, the BC Cancer Foundation’s Tour de Cure presented by Wheaton raised C$7.3 million to advance groundbreaking cancer research and care enhancements in British Columbia.
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
||||||||
|
(US dollars and shares in thousands, except per share amounts - unaudited)
|
|
2024
|
2023
|
2024
|
2023
|
||||
|
Sales
|
|
$
|
308,253
|
$
|
223,137
|
$
|
904,123
|
$
|
702,573
|
|
Cost of sales
|
|
|
|
|
|||||
|
Cost of sales, excluding depletion
|
$
|
55,310
|
$
|
49,808
|
$
|
170,872
|
$
|
160,413
|
|
|
Depletion
|
|
|
55,530
|
|
46,435
|
|
178,071
|
|
145,908
|
|
Total cost of sales
|
|
$
|
110,840
|
$
|
96,243
|
$
|
348,943
|
$
|
306,321
|
|
Gross margin
|
|
$
|
197,413
|
$
|
126,894
|
$
|
555,180
|
$
|
396,252
|
|
General and administrative expenses
|
|
9,488
|
8,606
|
|
30,193
|
28,922
|
|||
|
Share based compensation
|
|
9,628
|
4,336
|
|
17,150
|
16,217
|
|||
|
Donations and community investments
|
|
|
2,352
|
1,736
|
|
4,626
|
|
5,054
|
|
|
Earnings from operations
|
$
|
175,945
|
$
|
112,216
|
$
|
503,211
|
$
|
346,059
|
|
|
Gain on disposal of mineral stream interests
|
|
-
|
-
|
|
-
|
5,027
|
|||
|
Other income (expense)
|
|
|
7,605
|
|
10,707
|
|
19,922
|
|
26,961
|
|
Earnings before finance costs and income taxes
|
$
|
183,550
|
$
|
122,923
|
$
|
523,133
|
$
|
378,047
|
|
|
Finance costs
|
|
|
1,404
|
|
1,407
|
|
4,144
|
|
4,138
|
|
Earnings before income taxes
|
$
|
182,146
|
$
|
121,516
|
$
|
518,989
|
$
|
373,909
|
|
|
Income tax expense
|
|
|
27,511
|
|
5,145
|
|
77,996
|
|
4,700
|
|
Net earnings
|
|
$
|
154,635
|
$
|
116,371
|
$
|
440,993
|
$
|
369,209
|
|
Basic earnings per share
|
$
|
0.341
|
$
|
0.257
|
$
|
0.973
|
$
|
0.815
|
|
|
Diluted earnings per share
|
$
|
0.340
|
$
|
0.257
|
$
|
0.971
|
$
|
0.814
|
|
|
Weighted average number of shares outstanding
|
|
|
|
|
|||||
|
Basic
|
|
453,641
|
452,975
|
|
453,389
|
452,748
|
|||
|
Diluted
|
|
|
454,302
|
|
453,538
|
|
454,037
|
|
453,419
|
|
As at
September 30 |
As at
December 31 |
|||
|
(US dollars in thousands - unaudited)
|
2024
|
2023
|
||
|
Assets
|
|
|
||
|
Current assets
|
|
|
||
|
Cash and cash equivalents
|
$
|
694,085
|
$
|
546,527
|
|
Accounts receivable
|
|
10,435
|
10,078
|
|
|
Cobalt inventory
|
|
-
|
1,372
|
|
|
Income taxes receivable
|
|
1,392
|
5,935
|
|
|
Other
|
|
3,938
|
|
3,499
|
|
Total current assets
|
$
|
709,850
|
$
|
567,411
|
|
Non-current assets
|
|
|
||
|
Mineral stream interests
|
$
|
6,456,123
|
$
|
6,122,441
|
|
Early deposit mineral stream interests
|
|
47,094
|
47,093
|
|
|
Mineral royalty interests
|
|
40,429
|
13,454
|
|
|
Long-term equity investments
|
|
103,068
|
246,678
|
|
|
Property, plant and equipment
|
|
7,535
|
7,638
|
|
|
Other
|
|
22,080
|
|
26,470
|
|
Total non-current assets
|
$
|
6,676,329
|
$
|
6,463,774
|
|
Total assets
|
$
|
7,386,179
|
$
|
7,031,185
|
|
Liabilities
|
|
|
||
|
Current liabilities
|
|
|
||
|
Accounts payable and accrued liabilities
|
$
|
14,766
|
$
|
13,458
|
|
Current portion of performance share units
|
|
12,522
|
12,013
|
|
|
Current portion of lease liabilities
|
|
324
|
604
|
|
|
Total current liabilities
|
$
|
27,612
|
$
|
26,075
|
|
Non-current liabilities
|
|
|
||
|
Performance share units
|
$
|
9,301
|
$
|
9,113
|
|
Lease liabilities
|
|
5,340
|
5,625
|
|
|
Global minimum tax
|
|
78,361
|
-
|
|
|
Deferred income taxes
|
|
264
|
232
|
|
|
Pension liability
|
|
5,287
|
|
4,624
|
|
Total non-current liabilities
|
$
|
98,553
|
$
|
19,594
|
|
Total liabilities
|
$
|
126,165
|
$
|
45,669
|
|
Shareholders' equity
|
|
|
||
|
Issued capital
|
$
|
3,797,558
|
$
|
3,777,323
|
|
Reserves
|
|
(44,489)
|
(40,091)
|
|
|
Retained earnings
|
|
3,506,945
|
|
3,248,284
|
|
Total shareholders' equity
|
$
|
7,260,014
|
$
|
6,985,516
|
|
Total liabilities and shareholders' equity
|
$
|
7,386,179
|
$
|
7,031,185
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
||||||||
|
(US dollars in thousands - unaudited)
|
|
2024
|
2023
|
2024
|
2023
|
||||
|
Operating activities
|
|
|
|
|
|||||
|
Net earnings
|
$
|
154,635
|
$
|
116,371
|
$
|
440,993
|
$
|
369,209
|
|
|
Adjustments for
|
|
|
|
|
|||||
|
Depreciation and depletion
|
|
55,887
|
46,784
|
|
179,111
|
147,031
|
|||
|
Gain on disposal of mineral stream interest
|
|
-
|
-
|
|
-
|
(5,027)
|
|||
|
Interest expense
|
|
71
|
78
|
|
216
|
131
|
|||
|
Equity settled stock based compensation
|
|
1,725
|
1,732
|
|
4,978
|
5,133
|
|||
|
Performance share units - expense
|
|
7,903
|
2,604
|
|
12,172
|
11,084
|
|||
|
Performance share units - paid
|
|
-
|
-
|
|
(11,129)
|
(16,675)
|
|||
|
Pension expense
|
|
336
|
329
|
|
794
|
787
|
|||
|
Pension paid
|
|
-
|
-
|
|
(43)
|
(116)
|
|||
|
Income tax (recovery) expense
|
|
27,511
|
5,145
|
|
77,996
|
4,700
|
|||
|
(Gain) loss on fair value adjustment of share purchase warrants held
|
|
(523)
|
143
|
|
(903)
|
248
|
|||
|
Investment income recognized in net earnings
|
|
(7,249)
|
(10,537)
|
|
(18,564)
|
(26,564)
|
|||
|
Other
|
|
2,246
|
163
|
|
2,646
|
662
|
|||
|
Change in non-cash working capital
|
|
|
2,837
|
|
(489)
|
|
1,329
|
|
(876)
|
|
Cash generated from operations before income taxes and interest
|
$
|
245,379
|
$
|
162,323
|
$
|
689,596
|
$
|
489,727
|
|
|
Income taxes paid
|
|
2,925
|
(912)
|
|
2,734
|
(5,244)
|
|||
|
Interest paid
|
|
(71)
|
(79)
|
|
(219)
|
(112)
|
|||
|
Interest received
|
|
|
6,104
|
|
9,771
|
|
15,999
|
|
24,213
|
|
Cash generated from operating activities
|
|
$
|
254,337
|
$
|
171,103
|
$
|
708,110
|
$
|
508,584
|
|
Financing activities
|
|
|
|
|
|||||
|
Credit facility extension fees
|
$
|
(11)
|
$
|
(13)
|
$
|
(936)
|
$
|
(859)
|
|
|
Share purchase options exercised
|
|
847
|
93
|
|
13,011
|
10,603
|
|||
|
Lease payments
|
|
|
(149)
|
|
(169)
|
|
(444)
|
|
(548)
|
|
Dividends paid
|
|
|
(69,984)
|
|
(66,994)
|
|
(209,108)
|
|
(198,085)
|
|
Cash used for financing activities
|
|
$
|
(69,297)
|
$
|
(67,083)
|
$
|
(197,477)
|
$
|
(188,889)
|
|
Investing activities
|
|
|
|
|
|||||
|
Mineral stream interests
|
$
|
(25,876)
|
$
|
(90,710)
|
$
|
(512,383)
|
$
|
(210,944)
|
|
|
Early deposit mineral stream interests
|
|
-
|
(250)
|
|
-
|
(1,000)
|
|||
|
Mineral royalty interest
|
|
(4,956)
|
(3,602)
|
|
(26,981)
|
(3,602)
|
|||
|
Net proceeds on disposal of mineral stream interests
|
|
-
|
-
|
|
-
|
46,400
|
|||
|
Acquisition of long-term investments
|
|
(728)
|
(5,006)
|
|
(1,479)
|
(13,181)
|
|||
|
Proceeds on disposal of long-term investments
|
|
-
|
-
|
|
177,088
|
202
|
|||
|
Dividends received
|
|
482
|
700
|
|
1,663
|
1,617
|
|||
|
Other
|
|
|
(155)
|
|
(35)
|
|
(944)
|
|
(1,804)
|
|
Cash used for investing activities
|
|
$
|
(31,233)
|
$
|
(98,903)
|
$
|
(363,036)
|
$
|
(182,312)
|
|
Effect of exchange rate changes on cash and cash equivalents
|
|
$
|
61
|
$
|
(35)
|
$
|
(39)
|
$
|
447
|
|
Increase in cash and cash equivalents
|
$
|
153,868
|
$
|
5,082
|
$
|
147,558
|
$
|
137,830
|
|
|
Cash and cash equivalents, beginning of period
|
|
540,217
|
|
828,837
|
|
546,527
|
|
696,089
|
|
|
Cash and cash equivalents, end of period
|
|
$
|
694,085
|
$
|
833,919
|
$
|
694,085
|
$
|
833,919
|
|
|
Q3 2024
|
Q2 2024
|
Q1 2024
|
Q4 2023
|
Q3 2023
|
Q2 2023
|
Q1 2023
|
Q4 2022
|
|
Gold ounces produced ²
|
|
|
|
|
||||
|
Salobo
|
62,689
|
63,225
|
61,622
|
71,778
|
69,045
|
54,804
|
43,677
|
37,939
|
|
Sudbury 3
|
4,287
|
4,477
|
5,618
|
5,823
|
3,857
|
5,818
|
6,203
|
5,270
|
|
Constancia
|
10,446
|
6,086
|
13,897
|
22,292
|
19,003
|
7,444
|
6,905
|
10,496
|
|
San Dimas 4
|
6,882
|
7,089
|
7,542
|
10,024
|
9,995
|
11,166
|
10,754
|
10,037
|
|
Stillwater 5
|
2,247
|
2,099
|
2,637
|
2,341
|
2,454
|
2,017
|
1,960
|
2,185
|
|
Other
|
|
|
|
|
||||
|
Marmato
|
648
|
584
|
623
|
668
|
673
|
639
|
457
|
533
|
|
Minto 6
|
-
|
-
|
-
|
-
|
-
|
1,292
|
3,063
|
2,567
|
|
Total Other
|
648
|
584
|
623
|
668
|
673
|
1,931
|
3,520
|
3,100
|
|
Total gold ounces produced
|
87,199
|
83,560
|
91,939
|
112,926
|
105,027
|
83,180
|
73,019
|
69,027
|
|
Silver ounces produced 2
|
|
|
|
|
||||
|
Peñasquito 7
|
1,785
|
2,263
|
2,643
|
1,036
|
-
|
1,744
|
2,076
|
1,761
|
|
Antamina
|
925
|
992
|
806
|
1,030
|
894
|
984
|
872
|
1,067
|
|
Constancia
|
648
|
451
|
640
|
836
|
697
|
420
|
552
|
655
|
|
Other
|
|
|
|
|
||||
|
Los Filos
|
42
|
27
|
48
|
26
|
32
|
41
|
45
|
14
|
|
Zinkgruvan
|
537
|
699
|
641
|
510
|
785
|
374
|
632
|
664
|
|
Neves-Corvo
|
425
|
432
|
524
|
573
|
486
|
407
|
436
|
369
|
|
Aljustrel 8
|
-
|
-
|
-
|
-
|
327
|
279
|
343
|
313
|
|
Cozamin
|
185
|
177
|
173
|
185
|
165
|
184
|
141
|
157
|
|
Marmato
|
7
|
6
|
7
|
10
|
11
|
7
|
8
|
9
|
|
Yauliyacu 9
|
-
|
-
|
-
|
-
|
-
|
-
|
-
|
261
|
|
Minto 6
|
-
|
-
|
-
|
-
|
-
|
14
|
29
|
33
|
|
Total Other
|
1,196
|
1,341
|
1,393
|
1,304
|
1,806
|
1,306
|
1,634
|
1,820
|
|
Total silver ounces produced
|
4,554
|
5,047
|
5,482
|
4,206
|
3,397
|
4,454
|
5,134
|
5,303
|
|
Palladium ounces produced ²
|
|
|
|
|
||||
|
Stillwater 5
|
4,034
|
4,338
|
4,463
|
4,209
|
4,006
|
3,880
|
3,705
|
3,869
|
|
Cobalt pounds produced ²
|
|
|
|
|
||||
|
Voisey's Bay
|
397
|
259
|
240
|
215
|
183
|
152
|
124
|
128
|
|
GEOs produced 10
|
144,164
|
145,449
|
158,775
|
164,796
|
147,278
|
137,323
|
134,730
|
132,780
|
|
Average payable rate 2
|
|
|
|
|
|
|
||
|
Gold
|
95.1%
|
95.0%
|
94.7%
|
95.1%
|
95.4%
|
95.1%
|
95.1%
|
94.9%
|
|
Silver
|
83.9%
|
84.3%
|
84.5%
|
83.0%
|
78.4%
|
83.7%
|
83.1%
|
84.2%
|
|
Palladium
|
98.4%
|
97.3%
|
97.8%
|
98.0%
|
94.1%
|
94.1%
|
96.3%
|
93.9%
|
|
Cobalt
|
93.3%
|
93.3%
|
93.3%
|
93.3%
|
93.3%
|
93.3%
|
93.3%
|
93.3%
|
|
GEO 10
|
91.1%
|
90.7%
|
90.7%
|
91.6%
|
90.9%
|
90.9%
|
89.8%
|
89.9%
|
| 1) |
All figures in thousands except gold and palladium ounces produced.
|
| 2) |
Quantity produced represent the amount of gold, silver, palladium and cobalt contained in concentrate or doré prior to smelting or refining deductions. Production figures and payable rates are based on
information provided by the operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures and payable rates may
be updated in future periods as additional information is received.
|
| 3) |
Comprised of the Coleman, Copper Cliff, Garson, Creighton and Totten gold interests.
|
| 4) |
Under the terms of the San Dimas PMPA, the Company is entitled to an amount equal to 25% of the payable gold production plus an additional amount of gold equal to 25% of the payable silver production
converted to gold at a fixed gold to silver exchange ratio of 70:1 from the San Dimas mine. If the average gold to silver price ratio decreases to less than 50:1 or increases to more than 90:1 for a period of 6 months or more, then the "70"
shall be revised to "50" or "90", as the case may be, until such time as the average gold to silver price ratio is between 50:1 to 90:1 for a period of 6 months or more in which event the "70" shall be reinstated. For reference, attributable
silver production from prior periods is as follows: Q3 2024 - 262,000 ounces; Q2 2024 - 285,000 ounces; Q1 2024 - 291,000 ounces; Q4 2023 - 378,000 ounces; Q3 2023 - 387,000 ounces; Q2 2023 - 423,000 ounces; Q1 2023 - 401,000 ounces; Q4 2022 -
348,000 ounces.
|
| 5) |
Comprised of the Stillwater and East Boulder gold and palladium interests.
|
| 6) |
On May 13, 2023, Minto Metals Corp. announced the suspension of operations at the Minto mine.
|
| 7) |
There was a temporary suspension of operations at Peñasquito due to a labour strike which ran from June 7, 2023 to October 13, 2023.
|
| 8) |
On September 12, 2023, it was announced that the production of the zinc and lead concentrates at the Aljustrel mine will be halted from September 24, 2023 until the second quarter of 2025.
|
| 9) |
On December 14, 2022 the Company terminated the Yauliyacu PMPA in exchange for a cash payment of $132 million.
|
| 10) |
GEOs, which are provided to assist the reader, are based on the following commodity price assumptions: $2,000 per ounce gold; $23.00 per ounce silver; $1,000 per ounce palladium; and $13.00 per pound
cobalt; consistent with those used in estimating the Company's production guidance for 2024.
|
|
|
Q3 2024
|
Q2 2024
|
Q1 2024
|
Q4 2023
|
Q3 2023
|
Q2 2023
|
Q1 2023
|
Q4 2022
|
|
Gold ounces sold
|
|
|
|
|
||||
|
Salobo
|
58,101
|
54,962
|
56,841
|
76,656
|
44,444
|
46,030
|
35,966
|
41,029
|
|
Sudbury 2
|
2,495
|
5,679
|
4,129
|
5,011
|
4,836
|
4,775
|
4,368
|
4,988
|
|
Constancia
|
5,186
|
6,640
|
20,123
|
19,925
|
12,399
|
9,619
|
6,579
|
6,013
|
|
San Dimas
|
7,022
|
6,801
|
7,933
|
10,472
|
9,695
|
11,354
|
10,651
|
10,943
|
|
Stillwater 3
|
1,635
|
2,628
|
2,355
|
2,314
|
1,985
|
2,195
|
2,094
|
1,783
|
|
Other
|
|
|
|
|
||||
|
Marmato
|
550
|
616
|
638
|
633
|
792
|
467
|
480
|
473
|
|
777
|
-
|
-
|
-
|
-
|
275
|
153
|
126
|
785
|
|
Minto
|
-
|
-
|
-
|
-
|
-
|
701
|
2,341
|
2,982
|
|
Santo Domingo 4
|
447
|
-
|
-
|
-
|
-
|
-
|
-
|
-
|
|
Curipamba 4
|
258
|
-
|
-
|
-
|
-
|
-
|
-
|
-
|
|
Total Other
|
1,255
|
616
|
638
|
633
|
1,067
|
1,321
|
2,947
|
4,240
|
|
Total gold ounces sold
|
75,694
|
77,326
|
92,019
|
115,011
|
74,426
|
75,294
|
62,605
|
68,996
|
|
Silver ounces sold
|
|
|
|
|
||||
|
Peñasquito
|
1,667
|
1,482
|
1,839
|
442
|
453
|
1,913
|
1,483
|
2,066
|
|
Antamina
|
989
|
917
|
762
|
1,091
|
794
|
963
|
814
|
1,114
|
|
Constancia
|
366
|
422
|
726
|
665
|
435
|
674
|
366
|
403
|
|
Other
|
|
|
|
|
||||
|
Los Filos
|
26
|
24
|
44
|
24
|
30
|
37
|
34
|
16
|
|
Zinkgruvan
|
488
|
597
|
297
|
449
|
714
|
370
|
520
|
547
|
|
Neves-Corvo
|
185
|
216
|
243
|
268
|
245
|
132
|
171
|
80
|
|
Aljustrel
|
-
|
-
|
1
|
86
|
142
|
182
|
205
|
156
|
|
Cozamin
|
148
|
158
|
147
|
141
|
139
|
150
|
119
|
150
|
|
Marmato
|
6
|
7
|
8
|
9
|
11
|
7
|
7
|
7
|
|
Yauliyacu
|
-
|
-
|
-
|
-
|
-
|
-
|
-
|
337
|
|
Minto
|
-
|
-
|
-
|
-
|
-
|
7
|
29
|
23
|
|
Keno Hill
|
-
|
-
|
-
|
-
|
-
|
-
|
1
|
1
|
|
777
|
-
|
-
|
-
|
-
|
2
|
2
|
-
|
35
|
|
Total Other
|
853
|
1,002
|
740
|
977
|
1,283
|
887
|
1,086
|
1,352
|
|
Total silver ounces sold
|
3,875
|
3,823
|
4,067
|
3,175
|
2,965
|
4,437
|
3,749
|
4,935
|
|
Palladium ounces sold
|
|
|
|
|
||||
|
Stillwater 3
|
3,761
|
4,301
|
4,774
|
3,339
|
4,242
|
3,392
|
2,946
|
3,396
|
|
Cobalt pounds sold
|
|
|
|
|
||||
|
Voisey's Bay
|
88
|
88
|
309
|
288
|
198
|
265
|
323
|
187
|
|
GEOs sold 5
|
122,715
|
124,009
|
143,184
|
155,059
|
111,935
|
129,734
|
109,293
|
128,662
|
|
Cumulative payable units PBND 6
|
|
|
|
|
|
|
|
|
|
Gold ounces
|
96,158
|
88,205
|
86,114
|
91,092
|
98,715
|
72,916
|
77,377
|
70,562
|
|
Silver ounces
|
2,748
|
2,801
|
2,368
|
1,802
|
1,486
|
1,790
|
2,531
|
2,013
|
|
Palladium ounces
|
6,186
|
6,018
|
6,198
|
6,666
|
5,607
|
6,122
|
5,751
|
5,098
|
|
Cobalt pounds
|
796
|
513
|
360
|
356
|
377
|
251
|
285
|
258
|
|
GEO 5
|
136,027
|
126,761
|
118,785
|
117,465
|
121,058
|
98,186
|
111,217
|
97,936
|
|
Inventory on hand
|
|
|
|
|
|
|
|
|
|
Cobalt pounds
|
-
|
-
|
-
|
88
|
155
|
310
|
398
|
633
|
| 1) |
All figures in thousands except gold and palladium ounces sold.
|
| 2) |
Comprised of the Coleman, Copper Cliff, Garson, Creighton and Totten gold interests.
|
| 3) |
Comprised of the Stillwater and East Boulder gold and palladium interests.
|
| 4) |
The ounces sold under Santo Domingo and Curipamba relate to ounces received due to the delay ounce provision as per the respective PMPA. Please see the Company's MD&A for more information.
|
| 5) |
GEOs, which are provided to assist the reader, are based on the following commodity price assumptions: $2,000 per ounce gold; $23.00 per ounce silver; $1,000 per ounce palladium; and $13.00 per pound
cobalt; consistent with those used in estimating the Company's production guidance for 2024.
|
| 6) |
Payable gold, silver and palladium ounces as well as cobalt pounds produced but not yet delivered (“PBND”) are based on management estimates. These figures may be updated in future periods as
additional information is received.
|
|
Three Months Ended September 30, 2024
|
||||||||||||||||
|
|
Units Produced²
|
Units
Sold |
Average
Realized Price ($'s Per Unit) |
Average
Cash Cost ($'s Per Unit) 3 |
Average
Depletion ($'s Per Unit) 4 |
Sales
|
Net
Earnings |
Cash Flow
From Operations |
Total
Assets |
|||||||
|
Gold
|
||||||||||||||||
|
Salobo
|
62,689
|
58,101
|
$
|
2,490
|
$
|
425
|
$
|
378
|
$
|
144,656
|
$
|
98,016
|
$
|
122,916
|
$
|
2,616,346
|
|
Sudbury 5
|
4,287
|
2,495
|
2,519
|
400
|
1,326
|
6,286
|
1,979
|
4,798
|
246,918
|
|||||||
|
Constancia
|
10,446
|
5,186
|
2,490
|
422
|
323
|
12,912
|
9,048
|
10,722
|
70,095
|
|||||||
|
San Dimas
|
6,882
|
7,022
|
2,490
|
637
|
290
|
17,482
|
10,975
|
13,010
|
138,507
|
|||||||
|
Stillwater
|
2,247
|
1,635
|
2,490
|
438
|
421
|
4,071
|
2,667
|
3,355
|
208,474
|
|||||||
|
Other 6
|
648
|
1,255
|
|
2,481
|
|
192
|
|
1,584
|
|
3,114
|
|
886
|
|
2,874
|
|
901,880
|
|
|
87,199
|
75,694
|
$
|
2,491
|
$
|
440
|
$
|
418
|
$
|
188,521
|
$
|
123,571
|
$
|
157,675
|
$
|
4,182,220
|
|
Silver
|
||||||||||||||||
|
Peñasquito
|
1,785
|
1,667
|
$
|
29.58
|
$
|
4.50
|
$
|
4.86
|
$
|
49,329
|
$
|
33,725
|
$
|
41,825
|
$
|
253,461
|
|
Antamina
|
925
|
989
|
29.58
|
6.06
|
8.46
|
29,257
|
14,893
|
23,260
|
498,029
|
|||||||
|
Constancia
|
648
|
366
|
29.58
|
6.23
|
6.10
|
10,822
|
6,310
|
8,543
|
170,242
|
|||||||
|
Other 7
|
1,196
|
853
|
|
30.17
|
|
4.34
|
|
4.83
|
|
25,741
|
|
17,912
|
|
22,594
|
|
645,485
|
|
|
4,554
|
3,875
|
$
|
29.71
|
$
|
5.03
|
$
|
5.89
|
$
|
115,149
|
$
|
72,840
|
$
|
96,222
|
$
|
1,567,217
|
|
Palladium
|
||||||||||||||||
|
Stillwater
|
4,034
|
3,761
|
$
|
969
|
$
|
173
|
$
|
429
|
$
|
3,644
|
$
|
1,380
|
$
|
2,994
|
$
|
215,082
|
|
Platreef
|
-
|
-
|
|
n.a.
|
|
n.a.
|
|
n.a.
|
|
-
|
|
-
|
|
-
|
|
78,820
|
|
|
4,034
|
3,761
|
$
|
969
|
$
|
173
|
$
|
429
|
$
|
3,644
|
$
|
1,380
|
$
|
2,994
|
$
|
293,902
|
|
Platinum
|
||||||||||||||||
|
Marathon
|
-
|
-
|
$
|
n.a.
|
$
|
n.a.
|
$
|
n.a.
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
9,451
|
|
Platreef
|
-
|
-
|
|
n.a.
|
|
n.a.
|
|
n.a.
|
|
-
|
|
-
|
|
-
|
|
57,588
|
|
|
-
|
-
|
$
|
n.a.
|
$
|
n.a.
|
$
|
n.a.
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
67,039
|
|
Cobalt
|
||||||||||||||||
|
Voisey's Bay
|
397
|
88
|
$
|
10.65
|
$
|
2.15
|
$
|
12.78
|
$
|
939
|
$
|
(378)
|
$
|
321
|
$
|
345,745
|
|
Operating results
|
|
|
|
|
|
|
|
$
|
308,253
|
$
|
197,413
|
$
|
257,212
|
$
|
6,456,123
|
|
|
Other
|
||||||||||||||||
|
General and administrative
|
$
|
(9,488)
|
$
|
(6,215)
|
||||||||||||
|
Share based compensation
|
(9,628)
|
-
|
||||||||||||||
|
Donations and community investments
|
(2,352)
|
(2,198)
|
||||||||||||||
|
Finance costs
|
(1,404)
|
(1,051)
|
||||||||||||||
|
Other
|
7,605
|
3,664
|
||||||||||||||
|
Income tax
|
|
|
|
|
|
|
|
|
|
|
|
(27,511)
|
|
2,925
|
|
|
|
Total other
|
|
|
|
|
|
|
|
|
$
|
(42,778)
|
$
|
(2,875)
|
$
|
930,056
|
||
|
|
|
|
|
|
|
|
|
|
|
|
$
|
154,635
|
$
|
254,337
|
$
|
7,386,179
|
| 1) |
Units of gold, silver and palladium produced and sold are reported in ounces, while cobalt is reported in pounds. All figures in thousands except gold and palladium ounces produced and sold and per
unit amounts.
|
| 2) |
Quantity produced represents the amount of gold, silver, palladium and cobalt contained in concentrate or doré prior to smelting or refining deductions. Production figures are based on information
provided by the operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be updated in future periods as
additional information is received.
|
| 3) |
Refer to discussion on non-IFRS measure (iii) at the end of this press release.
|
| 4) |
Includes the non-cash per ounce cost of sale associated with delay ounces. Please see the Company's MD&A for more information.
|
| 5) |
Comprised of the operating Coleman, Copper Cliff, Garson, Creighton and Totten gold interests and the non-operating Stobie and Victor gold interests.
|
| 6) |
Other gold interests comprised of the operating Marmato gold interest as well as the non-operating Minto, Copper World, Santo Domingo, Fenix, Blackwater, Curipamba, Marathon, Goose, Cangrejos,
Platreef, Curraghinalt and Kudz Ze Kayah gold interests. Other includes ounces sold that were received under the delay ounce provisions of each of the Santo Domingo and Curipamba PMPAs. Please see the Company's MD&A for more information.
|
| 7) |
Other silver interests comprised of the operating Los Filos, Zinkgruvan, Neves-Corvo, Marmato and Cozamin silver interests as well as the non-operating Stratoni, Aljustrel, Minto, Pascua-Lama, Copper
World, Navidad, Blackwater, Curipamba, Mineral Park and Kudz Ze Kayah silver interests.
|
|
Three Months Ended September 30, 2023
|
|||||||||||||||||
|
|
Units
Produced²
|
Units
Sold |
Average
Realized Price ($'s Per Unit) |
Average
Cash Cost ($'s Per Unit) 3 |
Average
Depletion ($'s Per Unit) |
Sales
|
Net
Earnings |
Cash Flow
From Operations |
Total
Assets |
||||||||
|
Gold
|
|||||||||||||||||
|
Salobo
|
69,045
|
44,444
|
$
|
1,944
|
$
|
420
|
$
|
330
|
$
|
86,395
|
$
|
53,026
|
$
|
67,710
|
$
|
2,341,485
|
|
|
Sudbury 4
|
3,857
|
4,836
|
1,950
|
400
|
1,204
|
9,428
|
1,669
|
7,494
|
268,224
|
||||||||
|
Constancia
|
19,003
|
12,399
|
1,944
|
419
|
316
|
24,102
|
14,991
|
18,906
|
86,555
|
||||||||
|
San Dimas
|
9,995
|
9,695
|
1,944
|
631
|
260
|
18,846
|
10,216
|
12,732
|
147,638
|
||||||||
|
Stillwater
|
2,454
|
1,985
|
1,944
|
349
|
510
|
3,859
|
2,154
|
3,167
|
212,650
|
||||||||
|
Other 5
|
673
|
1,067
|
|
1,945
|
|
368
|
|
391
|
|
2,077
|
|
1,266
|
|
1,684
|
|
557,035
|
|
|
|
105,027
|
74,426
|
$
|
1,944
|
$
|
444
|
$
|
381
|
$
|
144,707
|
$
|
83,322
|
$
|
111,693
|
$
|
3,613,587
|
|
|
Silver
|
|||||||||||||||||
|
Peñasquito
|
-
|
453
|
$
|
23.82
|
$
|
4.43
|
$
|
4.06
|
$
|
10,804
|
$
|
6,952
|
$
|
8,795
|
$
|
278,028
|
|
|
Antamina
|
894
|
794
|
23.82
|
4.81
|
7.06
|
18,915
|
9,496
|
15,097
|
527,227
|
||||||||
|
Constancia
|
697
|
435
|
23.82
|
6.18
|
6.24
|
10,360
|
4,958
|
7,674
|
183,736
|
||||||||
|
Other 6
|
1,806
|
1,283
|
|
23.62
|
|
5.15
|
|
2.64
|
|
30,293
|
|
20,301
|
|
19,439
|
|
549,641
|
|
|
|
3,397
|
2,965
|
$
|
23.73
|
$
|
5.10
|
$
|
4.57
|
$
|
70,372
|
$
|
41,707
|
$
|
51,005
|
$
|
1,538,632
|
|
|
Palladium
|
|||||||||||||||||
|
Stillwater
|
4,006
|
4,242
|
$
|
1,251
|
$
|
223
|
$
|
459
|
$
|
5,307
|
$
|
2,416
|
$
|
4,361
|
$
|
222,154
|
|
|
Platinum
|
|||||||||||||||||
|
Marathon
|
-
|
-
|
$
|
n.a.
|
$
|
n.a.
|
$
|
n.a.
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
9,450
|
|
|
Cobalt
|
|||||||||||||||||
|
Voisey's Bay
|
183
|
198
|
$
|
13.87
|
$
|
3.66 ⁷
|
$
|
12.98
|
$
|
2,751
|
$
|
(551)
|
$
|
4,235
|
$
|
353,631
|
|
|
Operating results
|
|
|
|
|
|
|
|
$
|
223,137
|
$
|
126,894
|
$
|
171,294
|
$
|
5,737,454
|
||
|
Other
|
|||||||||||||||||
|
General and administrative
|
$
|
(8,606)
|
$
|
(6,321)
|
|||||||||||||
|
Share based compensation
|
(4,336)
|
-
|
|||||||||||||||
|
Donations and community investments
|
(1,736)
|
(1,750)
|
|||||||||||||||
|
Finance costs
|
(1,407)
|
(1,078)
|
|||||||||||||||
|
Other
|
10,707
|
9,870
|
|||||||||||||||
|
Income tax
|
|
|
|
|
|
|
|
|
|
|
|
(5,145)
|
|
(912)
|
|
|
|
|
Total other
|
|
|
|
|
|
|
|
|
$
|
(10,523)
|
$
|
(191)
|
$
|
1,144,061
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
$
|
116,371
|
$
|
171,103
|
$
|
6,881,515
|
|
| 1) |
Units of gold, silver and palladium produced and sold are reported in ounces, while cobalt is reported in pounds. All figures in thousands except gold and palladium ounces produced and sold and per
unit amounts.
|
| 2) |
Quantity produced represents the amount of gold, silver, palladium and cobalt contained in concentrate or doré prior to smelting or refining deductions. Production figures are based on information
provided by the operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be updated in future periods as
additional information is received.
|
| 3) |
Refer to discussion on non-IFRS measure (iii) at the end of this press release.
|
| 4) |
Comprised of the operating Coleman, Copper Cliff, Garson, Creighton and Totten gold interests as well as the non-operating Stobie and Victor gold interests.
|
| 5) |
Other gold interests are comprised of the operating Marmato gold interests as well as the non-operating Minto, 777, Copper World, Santo Domingo, Fenix, Blackwater, Marathon, Curipamba, Goose and
Cangrejos gold interests. On June 22, 2022, Hudbay announced that mining activities at 777 have concluded and closure activities have commenced. On May 13, 2023, Minto announced the suspension of operations at the Minto mine.
|
| 6) |
Other silver interests comprised of the operating Los Filos, Zinkgruvan, Neves-Corvo, Aljustrel, Cozamin and Marmato silver interests, the non-operating Minto, 777, Loma de La Plata, Stratoni,
Pascua-Lama, Copper World, Blackwater and Curipamba silver interests. On June 22, 2022, Hudbay announced that mining activities at 777 have concluded and closure activities have commenced. On May 13, 2023, Minto announced the suspension of
operations at the Minto mine. On September 12, 2023, it was announced that the production of zinc and lead concentrates at Aljustrel will be halted from September 24, 2023 until the second quarter of 2025.
|
| 7) |
Cash cost per pound of cobalt sold during the third quarter of 2023 was net of a previously recorded inventory write-down of $0.1 million, resulting in a decrease of $0.51 per pound of cobalt sold.
|
|
|
|
|
Q3 2024
|
|
|
Q3 2023
|
|
|
Change
|
|
Change
|
|
GEO Production 1, 2
|
|
|
144,164
|
|
|
147,278
|
|
|
(3,114)
|
|
(2.1)%
|
|
GEO Sales 2
|
|
|
122,715
|
|
111,935
|
10,780
|
9.6 %
|
||||
|
Average price per GEO sold 2
|
|
$
|
2,512
|
|
$
|
1,993
|
|
$
|
519
|
|
26.0 %
|
|
Revenue
|
|
$
|
308,253
|
|
$
|
223,137
|
|
$
|
85,116
|
|
38.1 %
|
|
Cost of sales, excluding depletion
|
|
$
|
55,310
|
|
$
|
49,808
|
$
|
(5,502)
|
(11.0)%
|
||
|
Depletion
|
|
|
55,530
|
|
|
46,435
|
|
|
(9,095)
|
|
(19.6)%
|
|
Cost of Sales
|
|
$
|
110,840
|
|
$
|
96,243
|
|
$
|
(14,597)
|
|
(15.2)%
|
|
Gross Margin
|
|
$
|
197,413
|
|
$
|
126,894
|
$
|
70,519
|
55.6 %
|
||
|
General and administrative expenses
|
|
|
9,488
|
|
8,606
|
(882)
|
(10.2)%
|
||||
|
Share based compensation
|
|
|
9,628
|
|
4,336
|
(5,292)
|
(122.0)%
|
||||
|
Donations and community investments
|
|
|
2,352
|
|
|
1,736
|
|
|
(616)
|
|
(35.5)%
|
|
Earnings from Operations
|
|
$
|
175,945
|
|
$
|
112,216
|
$
|
63,729
|
56.8 %
|
||
|
Other income (expense)
|
|
|
7,605
|
|
|
10,707
|
|
|
(3,102)
|
|
(29.0)%
|
|
Earnings before finance costs and income taxes
|
|
$
|
183,550
|
|
$
|
122,923
|
$
|
60,627
|
49.3 %
|
||
|
Finance costs
|
|
|
1,404
|
|
|
1,407
|
|
|
3
|
|
0.2 %
|
|
Earnings before income taxes
|
|
$
|
182,146
|
|
$
|
121,516
|
$
|
60,630
|
49.9 %
|
||
|
Income tax expense
|
|
|
27,511
|
|
|
5,145
|
|
|
(22,366)
|
|
(434.7)%
|
|
Net earnings
|
|
$
|
154,635
|
|
$
|
116,371
|
|
$
|
38,264
|
|
32.9 %
|
|
1)
|
Quantity produced represents the amount of gold, silver, palladium and cobalt contained in concentrate or doré prior to smelting or refining deductions. Production figures
are based on information provided by the operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be
updated in future periods as additional information is received.
|
|
2)
|
GEOs, which are provided to assist the reader, are based on the following commodity price assumptions: $2,000 per ounce gold; $23.00 per ounce silver; $1,000 per ounce
palladium; and $13.00 per pound cobalt; consistent with those used in estimating the Company's production guidance for 2024.
|
|
Nine Months Ended September 30, 2024
|
||||||||||||||||
|
|
Units
Produced²
|
Units
Sold |
Average
Realized Price ($'s Per Unit) |
Average
Cash Cost ($'s Per Unit) 3 |
Average
Depletion ($'s Per Unit) 4 |
Sales
|
Net
Earnings |
Cash Flow
From Operations |
Total
Assets |
|||||||
|
Gold
|
||||||||||||||||
|
Salobo
|
187,536
|
169,904
|
$
|
2,307
|
$
|
425
|
$
|
383
|
$
|
391,973
|
$
|
254,758
|
$
|
322,761
|
$
|
2,616,346
|
|
Sudbury 5
|
14,382
|
12,303
|
2,286
|
400
|
1,265
|
28,130
|
7,642
|
22,718
|
246,918
|
|||||||
|
Constancia
|
30,429
|
31,949
|
2,200
|
421
|
318
|
70,275
|
46,663
|
56,833
|
70,095
|
|||||||
|
San Dimas
|
21,513
|
21,756
|
2,296
|
634
|
286
|
49,950
|
29,941
|
36,156
|
138,507
|
|||||||
|
Stillwater
|
6,983
|
6,618
|
2,288
|
405
|
453
|
15,144
|
9,469
|
12,464
|
208,474
|
|||||||
|
Other 6
|
1,855
|
2,509
|
|
2,347
|
|
293
|
|
1,056
|
|
5,888
|
|
2,504
|
|
5,153
|
|
901,880
|
|
|
262,698
|
245,039
|
$
|
2,291
|
$
|
440
|
$
|
419
|
$
|
561,360
|
$
|
350,977
|
$
|
456,085
|
$
|
4,182,220
|
|
Silver
|
||||||||||||||||
|
Peñasquito
|
6,691
|
4,988
|
$
|
27.18
|
$
|
4.50
|
$
|
4.57
|
$
|
135,578
|
$
|
90,361
|
$
|
113,132
|
$
|
253,461
|
|
Antamina
|
2,723
|
2,668
|
27.63
|
5.56
|
8.06
|
73,710
|
37,377
|
58,878
|
498,029
|
|||||||
|
Constancia
|
1,739
|
1,514
|
26.55
|
6.21
|
6.17
|
40,180
|
21,444
|
30,785
|
170,242
|
|||||||
|
Other 7
|
3,930
|
2,595
|
|
28.37
|
|
4.29
|
|
4.51
|
|
73,630
|
|
50,785
|
|
60,026
|
|
645,485
|
|
|
15,083
|
11,765
|
$
|
27.46
|
$
|
4.91
|
$
|
5.55
|
$
|
323,098
|
$
|
199,967
|
$
|
262,821
|
$
|
1,567,217
|
|
Palladium
|
||||||||||||||||
|
Stillwater
|
12,835
|
12,836
|
$
|
976
|
$
|
177
|
$
|
435
|
$
|
12,531
|
$
|
4,674
|
$
|
10,259
|
$
|
215,082
|
|
Platreef
|
-
|
-
|
|
n.a.
|
|
n.a.
|
|
n.a.
|
|
-
|
|
-
|
|
-
|
|
78,820
|
|
|
12,835
|
12,836
|
$
|
976
|
$
|
177
|
$
|
435
|
$
|
12,531
|
$
|
4,674
|
$
|
10,259
|
$
|
293,902
|
|
Platinum
|
||||||||||||||||
|
Marathon
|
-
|
-
|
$
|
n.a.
|
$
|
n.a.
|
$
|
n.a.
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
9,451
|
|
Platreef
|
-
|
-
|
|
n.a.
|
|
n.a.
|
|
n.a.
|
|
-
|
|
-
|
|
-
|
|
57,588
|
|
|
-
|
-
|
$
|
n.a.
|
$
|
n.a.
|
$
|
n.a.
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
67,039
|
|
Cobalt
|
||||||||||||||||
|
Voisey's Bay
|
896
|
485
|
$
|
14.71
|
$
|
2.84
|
$
|
12.77
|
$
|
7,134
|
$
|
(438)
|
$
|
9,407
|
$
|
345,745
|
|
Operating results
|
|
|
|
|
|
|
|
$
|
904,123
|
$
|
555,180
|
$
|
738,572
|
$
|
6,456,123
|
|
|
Other
|
||||||||||||||||
|
General and administrative
|
$
|
(30,193)
|
$
|
(31,134)
|
||||||||||||
|
Share based compensation
|
(17,150)
|
(11,129)
|
||||||||||||||
|
Donations and community investments
|
(4,626)
|
(4,185)
|
||||||||||||||
|
Finance costs
|
(4,144)
|
(3,234)
|
||||||||||||||
|
Other
|
19,922
|
16,486
|
||||||||||||||
|
Income tax
|
|
|
|
|
|
|
|
|
|
|
|
(77,996)
|
|
2,734
|
|
|
|
Total other
|
|
|
|
|
|
|
|
|
$
|
(114,187)
|
$
|
(30,462)
|
$
|
930,056
|
||
|
|
|
|
|
|
|
|
|
|
|
|
$
|
440,993
|
$
|
708,110
|
$
|
7,386,179
|
| 1) |
Units of gold, silver and palladium produced and sold are reported in ounces, while cobalt is reported in pounds. All figures in thousands except gold and palladium ounces produced and sold and per
unit amounts.
|
| 2) |
Quantity produced represents the amount of gold, silver, palladium and cobalt contained in concentrate or doré prior to smelting or refining deductions. Production figures are based on information
provided by the operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be updated in future periods as
additional information is received.
|
| 3) |
Refer to discussion on non-IFRS measure (iii) at the end of this press release.
|
| 4) |
Includes the non-cash per ounce cost of sale associated with delay ounces. Please see the Company's MD&A for more information.
|
| 5) |
Comprised of the operating Coleman, Copper Cliff, Garson, Creighton and Totten gold interests and the non-operating Stobie and Victor gold interests.
|
| 6) |
Other gold interests comprised of the operating Marmato gold interest as well as the non-operating Minto, Copper World, Santo Domingo, Fenix, Blackwater, Curipamba, Marathon, Goose, Cangrejos,
Platreef, Curraghinalt and Kudz Ze Kayah gold interests.
Other includes ounces sold that were received under the delay ounce provisions of each of the Santo Domingo and Curipamba PMPAs. Please see the Company’s MD&A for more information.
|
| 7) |
Other silver interests comprised of the operating Los Filos, Zinkgruvan, Neves-Corvo, Marmato and Cozamin silver interests as well as the non-operating Stratoni, Aljustrel, Minto, Pascua-Lama, Copper
World, Navidad, Blackwater, Curipamba, Mineral Park and Kudz Ze Kayah silver interests..
|
|
Nine Months Ended September 30, 2023
|
||||||||||||||||||
|
|
Units
Produced²
|
Units
Sold |
Average
Realized Price ($'s Per Unit) |
Average
Cash Cost ($'s Per Unit) 3 |
Average
Depletion ($'s Per Unit) |
Sales
|
Gain on Disposal 4
|
Net
Earnings |
Cash Flow
From Operations |
Total
Assets |
||||||||
|
Gold
|
||||||||||||||||||
|
Salobo
|
167,526
|
126,440
|
$
|
1,947
|
$
|
420
|
$
|
330
|
$
|
246,219
|
$
|
-
|
$
|
151,287
|
$
|
193,063
|
$
|
2,341,485
|
|
Sudbury 5
|
15,878
|
13,979
|
1,953
|
400
|
1,087
|
27,295
|
-
|
6,512
|
21,420
|
268,224
|
||||||||
|
Constancia
|
33,352
|
28,597
|
1,948
|
417
|
316
|
55,718
|
-
|
34,751
|
43,779
|
86,555
|
||||||||
|
San Dimas
|
31,915
|
31,700
|
1,945
|
628
|
260
|
61,657
|
-
|
33,535
|
41,762
|
147,638
|
||||||||
|
Stillwater
|
6,431
|
6,274
|
1,945
|
347
|
510
|
12,201
|
-
|
6,824
|
10,026
|
212,650
|
||||||||
|
Other 6
|
6,124
|
5,335
|
1,935
|
1,119
|
172
|
10,324
|
-
|
3,439
|
4,090
|
557,035
|
||||||||
|
|
261,226
|
212,325
|
$
|
1,947
|
$
|
465
|
$
|
369
|
$
|
413,414
|
$
|
-
|
$
|
236,348
|
$
|
314,140
|
$
|
3,613,587
|
|
Silver
|
||||||||||||||||||
|
Peñasquito
|
3,820
|
3,849
|
$
|
23.63
|
$
|
4.43
|
$
|
4.06
|
$
|
90,967
|
$
|
-
|
$
|
58,268
|
$
|
73,915
|
$
|
278,028
|
|
Antamina
|
2,750
|
2,571
|
23.65
|
4.69
|
7.06
|
60,812
|
-
|
30,625
|
48,765
|
527,227
|
||||||||
|
Constancia
|
1,669
|
1,475
|
23.75
|
6.15
|
6.24
|
35,034
|
-
|
16,750
|
25,962
|
183,736
|
||||||||
|
Other 7
|
4,746
|
3,256
|
23.44
|
5.58
|
2.82
|
76,316
|
5,027
|
53,966
|
55,364
|
549,641
|
||||||||
|
|
12,985
|
11,151
|
$
|
23.60
|
$
|
5.05
|
$
|
4.68
|
$
|
263,129
|
$
|
5,027
|
$
|
159,609
|
$
|
204,006
|
$
|
1,538,632
|
|
Palladium
|
||||||||||||||||||
|
Stillwater
|
11,591
|
10,580
|
$
|
1,410
|
$
|
255
|
$
|
440
|
$
|
14,922
|
$
|
-
|
$
|
7,565
|
$
|
12,223
|
$
|
222,154
|
|
Platinum
|
||||||||||||||||||
|
Marathon
|
-
|
-
|
$
|
n.a.
|
$
|
n.a.
|
$
|
n.a.
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
9,450
|
|
Cobalt
|
||||||||||||||||||
|
Voisey's Bay
|
458
|
786
|
$
|
14.13
|
$
|
3.36 ⁸
|
$
|
13.63
|
$
|
11,108
|
$
|
-
|
$
|
(2,243)
|
$
|
13,056
|
$
|
353,631
|
|
Operating results
|
|
|
|
|
|
|
|
$
|
702,573
|
$
|
5,027
|
$
|
401,279
|
$
|
543,425
|
$
|
5,737,454
|
|
|
Other
|
||||||||||||||||||
|
General and administrative
|
$
|
(28,922)
|
$
|
(29,702)
|
||||||||||||||
|
Share based compensation
|
(16,217)
|
(16,675)
|
||||||||||||||||
|
Donations and community investments
|
(5,054)
|
(4,896)
|
||||||||||||||||
|
Finance costs
|
(4,138)
|
(3,147)
|
||||||||||||||||
|
Other
|
26,961
|
24,823
|
||||||||||||||||
|
Income tax
|
(4,700)
|
(5,244)
|
||||||||||||||||
|
Total other
|
|
|
|
|
|
|
|
|
|
|
$
|
(32,070)
|
$
|
(34,841)
|
$
|
1,144,061
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$
|
369,209
|
$
|
508,584
|
$
|
6,881,515
|
| 1) |
Units of gold, silver and palladium produced and sold are reported in ounces, while cobalt is reported in pounds. All figures in thousands except gold and palladium ounces produced and sold and per
unit amounts.
|
| 2) |
Quantity produced represents the amount of gold, silver, palladium and cobalt contained in concentrate or doré prior to smelting or refining deductions. Production figures are based on information
provided by the operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be updated in future periods as
additional information is received.
|
| 3) |
Refer to discussion on non-IFRS measure (iii) at the end of this press release.
|
| 4) |
The gain on disposal of Other silver interests relates to the gain on the buyback of 33% of the Goose PMPA.
|
| 5) |
Comprised of the operating Coleman, Copper Cliff, Garson, Creighton and Totten gold interests as well as the non-operating Stobie and Victor gold interests.
|
| 6) |
Other gold interests are comprised of the operating Marmato gold interests as well as the non-operating Minto, 777, Copper World, Santo Domingo, Fenix, Blackwater, Marathon, Curipamba, Goose and
Cangrejos gold interests. On June 22, 2022, Hudbay announced that mining activities at 777 have concluded and closure activities have commenced. On May 13, 2023, Minto announced the suspension of operations at the Minto mine.
|
| 7) |
Other silver interests comprised of the operating Los Filos, Zinkgruvan, Neves-Corvo, Aljustrel, Cozamin and Marmato silver interests and the non-operating Minto, 777, Loma de La Plata, Stratoni,
Pascua-Lama, Copper World, Blackwater and Curipamba silver interests. On June 22, 2022, Hudbay announced that mining activities at 777 have concluded and closure activities have commenced. On May 13, 2023, Minto announced the suspension of
operations at the Minto mine. On September 12, 2023, it was announced that the production of zinc and lead concentrates at Aljustrel will be halted from September 24, 2023 until the second quarter of 2025.
|
| 8) |
Cash cost per pound of cobalt sold during the nine months ended September 30, 2023 was net of a previously recorded inventory write-down of $1.6 million, resulting in a decrease of $2.05 per pound of
cobalt sold.
|
|
|
|
|
YTD 2024
|
|
|
YTD 2023
|
|
|
Change
|
|
Change
|
|
GEO Production 1, 2
|
|
|
448,388
|
|
|
419,330
|
|
|
29,058
|
|
6.9 %
|
|
GEO Sales 2
|
|
|
389,907
|
|
350,961
|
38,946
|
11.1 %
|
||||
|
Average price per GEO sold 2
|
|
$
|
2,319
|
|
$
|
2,002
|
|
$
|
317
|
|
15.8 %
|
|
Revenue
|
|
$
|
904,123
|
|
$
|
702,573
|
|
$
|
201,550
|
|
28.7 %
|
|
Cost of sales, excluding depletion
|
|
$
|
170,872
|
|
$
|
160,413
|
$
|
(10,459)
|
(6.5)%
|
||
|
Depletion
|
|
|
178,071
|
|
|
145,908
|
|
|
(32,163)
|
|
(22.0)%
|
|
Cost of Sales
|
|
$
|
348,943
|
|
$
|
306,321
|
|
$
|
(42,622)
|
|
(13.9)%
|
|
Gross Margin
|
|
$
|
555,180
|
|
$
|
396,252
|
$
|
158,928
|
40.1 %
|
||
|
General and administrative expenses
|
|
|
30,193
|
|
28,922
|
(1,271)
|
(4.4)%
|
||||
|
Share based compensation
|
|
|
17,150
|
|
16,217
|
(933)
|
(5.8)%
|
||||
|
Donations and community investments
|
|
|
4,626
|
|
|
5,054
|
|
|
428
|
|
8.5 %
|
|
Earnings from Operations
|
|
$
|
503,211
|
|
$
|
346,059
|
$
|
157,152
|
45.4 %
|
||
|
Gain on disposal of mineral stream interests
|
|
|
-
|
|
5,027
|
(5,027)
|
(100.0)%
|
||||
|
Other income (expense)
|
|
|
19,922
|
|
|
26,961
|
|
|
(7,039)
|
|
(26.1)%
|
|
Earnings before finance costs and income taxes
|
|
$
|
523,133
|
|
$
|
378,047
|
$
|
145,086
|
38.4 %
|
||
|
Finance costs
|
|
|
4,144
|
|
|
4,138
|
|
|
(6)
|
|
(0.1)%
|
|
Earnings before income taxes
|
|
$
|
518,989
|
|
$
|
373,909
|
$
|
145,080
|
38.8 %
|
||
|
Income tax expense
|
|
|
77,996
|
|
|
4,700
|
|
|
(73,296)
|
|
(1,559.5)%
|
|
Net earnings
|
|
$
|
440,993
|
|
$
|
369,209
|
|
$
|
71,784
|
|
19.4 %
|
|
1)
|
Quantity produced represents the amount of gold, silver, palladium and cobalt contained in concentrate or doré prior to smelting or refining deductions. Production figures are
based on information provided by the operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be
updated in future periods as additional information is received.
|
|
2)
|
GEOs, which are provided to assist the reader, are based on the following commodity price assumptions: $2,000 per ounce gold; $23.00 per ounce silver; $1,000 per ounce
palladium; and $13.00 per pound cobalt; consistent with those used in estimating the Company's production guidance for 2024.
|
| i. |
Adjusted net earnings and adjusted net earnings per share are calculated by removing the effects of non-cash impairment charges (reversals) (if any), non-cash fair value (gains) losses and other
one-time (income) expenses as well as the reversal of non-cash income tax expense (recovery) which is offset by income tax expense (recovery) recognized in the Statements of Shareholders’ Equity and OCI, respectively. The Company believes that,
in addition to conventional measures prepared in accordance with IFRS, management and certain investors use this information to evaluate the Company’s performance.
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
|||||||||||
|
(in thousands, except for per share amounts)
|
|
2024
|
|
2023
|
|
2024
|
|
2023
|
||||
|
Net earnings
|
|
$
|
154,635
|
$
|
116,371
|
|
$
|
440,993
|
$
|
369,209
|
||
|
Add back (deduct):
|
|
|
|
|
|
|
||||||
|
Gain on disposal of Mineral Stream Interest
|
|
|
-
|
-
|
|
|
-
|
(5,027)
|
||||
|
(Gain) loss on fair value adjustment of share purchase warrants held
|
|
|
(523)
|
143
|
|
|
(903)
|
248
|
||||
|
Deferred income tax (expense) recovery recognized in the Statement of OCI
|
|
|
(1,134)
|
5,115
|
|
|
1,632
|
7,205
|
||||
|
Income tax recovery related to prior year disposal of Mineral Stream Interest
|
|
|
-
|
-
|
|
|
-
|
(2,672)
|
||||
|
Other
|
|
|
(175)
|
|
|
(162)
|
|
|
(521)
|
|
|
(482)
|
|
Adjusted net earnings
|
|
$
|
152,803
|
|
$
|
121,467
|
|
$
|
441,201
|
|
$
|
368,481
|
|
Divided by:
|
|
|
|
|
|
|
||||||
|
Basic weighted average number of shares outstanding
|
|
|
453,641
|
452,975
|
|
|
453,389
|
452,748
|
||||
|
Diluted weighted average number of shares outstanding
|
|
|
454,302
|
|
|
453,538
|
|
|
454,037
|
|
|
453,419
|
|
Equals:
|
|
|
|
|
|
|
||||||
|
Adjusted earnings per share - basic
|
|
$
|
0.337
|
$
|
0.268
|
|
$
|
0.973
|
$
|
0.814
|
||
|
Adjusted earnings per share - diluted
|
|
$
|
0.336
|
|
$
|
0.268
|
|
$
|
0.972
|
|
$
|
0.813
|
| ii. |
Operating cash flow per share (basic and diluted) is calculated by dividing cash generated by operating activities by the weighted average number of shares outstanding (basic and diluted). The Company
presents operating cash flow per share as management and certain investors use this information to evaluate the Company’s performance in comparison to other companies in the precious metal mining industry who present results on a similar basis.
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
|||||||||||
|
(in thousands, except for per share amounts)
|
|
2024
|
|
2023
|
|
2024
|
|
2023
|
||||
|
Cash generated by operating activities
|
|
$
|
254,337
|
|
$
|
171,103
|
|
$
|
708,110
|
|
$
|
508,584
|
|
Divided by:
|
|
|
|
|
|
|
||||||
|
Basic weighted average number of shares outstanding
|
|
|
453,641
|
452,975
|
|
|
453,389
|
452,748
|
||||
|
Diluted weighted average number of shares outstanding
|
|
|
454,302
|
|
|
453,538
|
|
|
454,037
|
|
|
453,419
|
|
Equals:
|
|
|
|
|
|
|
||||||
|
Operating cash flow per share - basic
|
|
$
|
0.561
|
$
|
0.378
|
|
$
|
1.562
|
$
|
1.123
|
||
|
Operating cash flow per share - diluted
|
|
$
|
0.560
|
|
$
|
0.377
|
|
$
|
1.560
|
|
$
|
1.122
|
| iii. |
Average cash cost of gold, silver and palladium on a per ounce basis and cobalt on a per pound basis is calculated by dividing the total cost of sales, less depletion and cost of sales related to
delay ounces, by the ounces or pounds sold. In the precious metal mining industry, this is a common performance measure but does not have any standardized meaning prescribed by IFRS. In addition to
conventional measures prepared in accordance with IFRS, management and certain investors use this information to evaluate the Company’s performance and ability to generate cash flow.
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
|||||||||||
|
(in thousands, except for gold and palladium ounces sold and per unit amounts)
|
|
2024
|
|
2023
|
|
2024
|
|
2023
|
||||
|
Cost of sales
|
|
$
|
110,840
|
$
|
96,243
|
|
$
|
348,943
|
$
|
306,321
|
||
|
Less: depletion
|
|
|
(55,530)
|
(46,435)
|
|
|
(178,071)
|
(145,908)
|
||||
|
Less: cost of sales related to delay ounces 1
|
|
|
(1,698)
|
|
|
-
|
|
|
(1,698)
|
|
|
-
|
|
Cash cost of sales
|
|
$
|
53,612
|
|
$
|
49,808
|
|
$
|
169,174
|
|
$
|
160,413
|
|
Cash cost of sales is comprised of:
|
|
|
|
|
|
|
||||||
|
Total cash cost of gold sold
|
|
$
|
33,287
|
$
|
33,014
|
|
$
|
107,715
|
$
|
98,724
|
||
|
Total cash cost of silver sold
|
|
|
19,485
|
15,121
|
|
|
57,811
|
56,351
|
||||
|
Total cash cost of palladium sold
|
|
|
650
|
946
|
|
|
2,272
|
2,699
|
||||
|
Total cash cost of cobalt sold2
|
|
|
190
|
|
|
727
|
|
|
1,376
|
|
|
2,639
|
|
Total cash cost of sales
|
|
$
|
53,612
|
|
$
|
49,808
|
|
$
|
169,174
|
|
$
|
160,413
|
|
Divided by:
|
|
|
|
|
|
|
||||||
|
Total gold ounces sold
|
|
|
75,694
|
74,426
|
|
|
245,039
|
212,325
|
||||
|
Total silver ounces sold
|
|
|
3,875
|
2,965
|
|
|
11,765
|
11,151
|
||||
|
Total palladium ounces sold
|
|
|
3,761
|
4,242
|
|
|
12,836
|
10,580
|
||||
|
Total cobalt pounds sold
|
|
|
88
|
|
|
198
|
|
|
485
|
|
|
786
|
|
Equals:
|
|
|
|
|
|
|
||||||
|
Average cash cost of gold (per ounce)
|
|
$
|
440
|
$
|
444
|
|
$
|
440
|
$
|
465
|
||
|
Average cash cost of silver (per ounce)
|
|
$
|
5.03
|
$
|
5.10
|
|
$
|
4.91
|
$
|
5.05
|
||
|
Average cash cost of palladium (per ounce)
|
|
$
|
173
|
$
|
223
|
|
$
|
177
|
$
|
255
|
||
|
Average cash cost of cobalt (per pound)
|
|
$
|
2.15
|
|
$
|
3.66
|
|
$
|
2.84
|
|
$
|
3.36
|
| 1) |
The cost of sales related to delay ounces is a non-cash expense. Please see the Company’s MD&A for more information.
|
| 2) |
Cash cost per pound of cobalt sold during the third quarter of 2023 was net of a previously recorded inventory write-down of $0.1 million (nine months - $1.6 million), resulting in a decrease of $0.51
per pound of cobalt sold (nine months - $2.05 per pound of cobalt sold).
|
| iv. |
Cash operating margin is calculated by adding back depletion and the cost of sales related to delay ounces to the gross margin. Cash operating margin on a per ounce or per pound basis is calculated by
dividing the cash operating margin by the number of ounces or pounds sold during the period. The Company presents cash operating margin as management and certain investors use this information to evaluate the Company’s performance in comparison
to other companies in the precious metal mining industry who present results on a similar basis as well as to evaluate the Company’s ability to generate cash flow.
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
|||||||||||
|
(in thousands, except for gold and palladium ounces sold and per unit amounts)
|
|
2024
|
|
2023
|
|
2024
|
|
2023
|
||||
|
Gross margin
|
|
$
|
197,413
|
$
|
126,894
|
|
$
|
555,180
|
$
|
396,252
|
||
|
Add back: depletion
|
|
|
55,530
|
46,435
|
|
|
178,071
|
145,908
|
||||
|
Add back: cost of sales related to delay ounces 1
|
|
|
1,698
|
|
|
-
|
|
|
1,698
|
|
|
-
|
|
Cash operating margin
|
|
$
|
254,641
|
|
$
|
173,329
|
|
$
|
734,949
|
|
$
|
542,160
|
|
Cash operating margin is comprised of:
|
|
|
|
|
|
|
||||||
|
Total cash operating margin of gold sold
|
|
$
|
155,234
|
$
|
111,693
|
|
$
|
453,645
|
$
|
314,690
|
||
|
Total cash operating margin of silver sold
|
|
|
95,664
|
55,251
|
|
|
265,287
|
206,778
|
||||
|
Total cash operating margin of palladium sold
|
|
|
2,994
|
4,361
|
|
|
10,259
|
12,223
|
||||
|
Total cash operating margin of cobalt sold
|
|
|
749
|
|
|
2,024
|
|
|
5,758
|
|
|
8,469
|
|
Total cash operating margin
|
|
$
|
254,641
|
|
$
|
173,329
|
|
$
|
734,949
|
|
$
|
542,160
|
|
Divided by:
|
|
|
|
|
|
|
||||||
|
Total gold ounces sold
|
|
|
75,694
|
74,426
|
|
|
245,039
|
212,325
|
||||
|
Total silver ounces sold
|
|
|
3,875
|
2,965
|
|
|
11,765
|
11,151
|
||||
|
Total palladium ounces sold
|
|
|
3,761
|
4,242
|
|
|
12,836
|
10,580
|
||||
|
Total cobalt pounds sold
|
|
|
88
|
|
|
198
|
|
|
485
|
|
|
786
|
|
Equals:
|
|
|
|
|
|
|
||||||
|
Cash operating margin per gold ounce sold
|
|
$
|
2,051
|
$
|
1,500
|
|
$
|
1,851
|
$
|
1,482
|
||
|
Cash operating margin per silver ounce sold
|
|
$
|
24.68
|
$
|
18.63
|
|
$
|
22.55
|
$
|
18.55
|
||
|
Cash operating margin per palladium ounce sold
|
|
$
|
796
|
$
|
1,028
|
|
$
|
799
|
$
|
1,155
|
||
|
Cash operating margin per cobalt pound sold
|
|
$
|
8.50
|
|
$
|
10.21
|
|
$
|
11.87
|
|
$
|
10.77
|
| 1) |
The cost of sales related to delay ounces is a non-cash expense. Please see the Company’s MD&A for more information.
|
| • |
payment by the Company of $625 million to Montage and the satisfaction of each party's obligations in accordance with the Koné Gold PMPA;
|
| • |
the receipt by the Company of gold production in respect of the Koné Gold Project;
|
| • |
the advance by the Company, and the repayment by Montage, of up to $75 million to Montage in connection with the Facility;
|
| • |
payment by the Company of $125 million to Rio2 and the satisfaction of each party's obligations in accordance with the Fenix PMPA (as amended);
|
| • |
the receipt by the Company of gold production in respect of the Fenix Gold Project;
|
| • |
the advance by the Company, and the repayment by Rio2, of up to $20 million to Rio2 in connection with the Rio2 standby loan facility;
|
| • |
the future price of commodities;
|
| • |
the estimation of future production from the mineral stream interests and mineral royalty interests currently owned by the Company (the “Mining Operations”) (including in the estimation of production, mill throughput,
grades, recoveries and exploration potential);
|
| • |
the estimation of mineral reserves and mineral resources (including the estimation of reserve conversion rates and the realization of such estimations);
|
| • |
the commencement, timing and achievement of construction, expansion or improvement projects by Wheaton’s PMPA counterparties at Mining Operations;
|
| • |
the payment of upfront cash consideration to counterparties under PMPAs, the satisfaction of each party's obligations in accordance with PMPAs and the receipt by the Company of precious metals and cobalt production or
other payments in respect of the applicable Mining Operations under PMPAs;
|
| • |
the ability of Wheaton’s PMPA counterparties to comply with the terms of a PMPA (including as a result of the business, mining operations and performance of Wheaton’s PMPA counterparties) and the potential impacts of
such on Wheaton;
|
| • |
future payments by the Company in accordance with PMPAs, including any acceleration of payments;
|
| • |
the costs of future production;
|
| • |
the estimation of produced but not yet delivered ounces;
|
| • |
the future sales of Common Shares under, the amount of net proceeds from, and the use of the net proceeds from, the at-the-market equity program;
|
| • |
continued listing of the Common Shares on the LSE, NYSE and TSX;
|
| • |
any statements as to future dividends;
|
| • |
the ability to fund outstanding commitments and the ability to continue to acquire accretive PMPAs;
|
| • |
projected increases to Wheaton's production and cash flow profile;
|
| • |
projected changes to Wheaton’s production mix;
|
| • |
the ability of Wheaton’s PMPA counterparties to comply with the terms of any other obligations under agreements with the Company;
|
| • |
the ability to sell precious metals and cobalt production;
|
| • |
confidence in the Company’s business structure;
|
| • |
the Company’s assessment of taxes payable, including taxes payable under the GMT, and the impact of the CRA Settlement, and the Company’s ability to pay its taxes;
|
| • |
possible CRA domestic audits for taxation years subsequent to 2016 and international audits;
|
| • |
the Company’s assessment of the impact of any tax reassessments;
|
| • |
the Company’s intention to file future tax returns in a manner consistent with the CRA Settlement;
|
| • |
the Company’s climate change and environmental commitments; and
|
| • |
assessments of the impact and resolution of various legal and tax matters, including but not limited to audits.
|
| • |
risks relating to the satisfaction of each party's obligations in accordance with the terms of the Koné Gold PMPA;
|
| • |
risks relating to the satisfaction of each party’s obligations in accordance with the terms of the Facility;
|
| • |
risks relating to the satisfaction of each party's obligations in accordance with the terms of the Fenix PMPA;
|
| • |
risks relating to the satisfaction of each party’s obligations in accordance with the terms of the Rio2 standby loan facility;
|
| • |
risks associated with fluctuations in the price of commodities (including Wheaton’s ability to sell its precious metals or cobalt production at acceptable prices or at all);
|
| • |
risks related to the Mining Operations (including fluctuations in the price of the primary or other commodities mined at such operations, regulatory, political and other risks of the jurisdictions in which the Mining
Operations are located, actual results of mining, risks associated with exploration, development, operating, expansion and improvement at the Mining Operations, environmental and economic risks of the Mining Operations, and changes in project
parameters as Mining Operations plans continue to be refined);
|
| • |
absence of control over the Mining Operations and having to rely on the accuracy of the public disclosure and other information Wheaton receives from the owners and operators of the Mining Operations as the basis for
its analyses, forecasts and assessments relating to its own business;
|
| • |
risks related to the uncertainty in the accuracy of mineral reserve and mineral resource estimation;
|
| • |
risks related to the satisfaction of each party’s obligations in accordance with the terms of the Company’s PMPAs, including the ability of the companies with which the Company has PMPAs to perform their obligations
under those
|
| • |
risks relating to production estimates from Mining Operations, including anticipated timing of the commencement of production by certain Mining Operations;
|
| • |
Wheaton’s interpretation of, or compliance with, or application of, tax laws and regulations or accounting policies and rules, being found to be incorrect or the tax impact to the Company’s business operations being
materially different than currently contemplated, , or the ability of the Company to pay such taxes as and when due;
|
| • |
any challenge or reassessment by the CRA of the Company’s tax filings being successful and the potential negative impact to the Company’s previous and future tax filings;
|
| • |
risks in assessing the impact of the CRA Settlement (including whether there will be any material change in the Company's facts or change in law or jurisprudence);
|
| • |
risks related to any potential amendments to Canada’s transfer pricing rules under the Income Tax Act (Canada) that may result from the Department of Finance’s consultation paper released June 6, 2023;
|
| • |
risks relating to Wheaton’s interpretation of, compliance with, or application of the GMT, including Canada’s GMTA and the legislation enacted in Luxembourg, that applies to the income of the Company’s subsidiaries
for fiscal years beginning on or after December 31, 2023;
|
| • |
counterparty credit and liquidity risks;
|
| • |
mine operator and counterparty concentration risks;
|
| • |
indebtedness and guarantees risks;
|
| • |
hedging risk;
|
| • |
competition in the streaming industry risk;
|
| • |
risks relating to security over underlying assets;
|
| • |
risks relating to third-party PMPAs;
|
| • |
risks relating to revenue from royalty interests;
|
| • |
risks related to Wheaton’s acquisition strategy;
|
| • |
risks relating to third-party rights under PMPAs;
|
| • |
risks relating to future financings and security issuances;
|
| • |
risks relating to unknown defects and impairments;
|
| • |
risks related to governmental regulations;
|
| • |
risks related to international operations of Wheaton and the Mining Operations;
|
| • |
risks relating to exploration, development, operating, expansions and improvements at the Mining Operations;
|
| • |
risks related to environmental regulations;
|
| • |
the ability of Wheaton and the Mining Operations to obtain and maintain necessary licenses, permits, approvals and rulings;
|
| • |
the ability of Wheaton and the Mining Operations to comply with applicable laws, regulations and permitting requirements;
|
| • |
lack of suitable supplies, infrastructure and employees to support the Mining Operations;
|
| • |
risks related to underinsured Mining Operations;
|
| • |
inability to replace and expand mineral reserves, including anticipated timing of the commencement of production by certain Mining Operations (including increases in production, estimated grades and recoveries);
|
| • |
uncertainties related to title and indigenous rights with respect to the mineral properties of the Mining Operations;
|
| • |
the ability of Wheaton and the Mining Operations to obtain adequate financing;
|
| • |
the ability of the Mining Operations to complete permitting, construction, development and expansion;
|
| • |
challenges related to global financial conditions;
|
| • |
risks associated with environmental, social and governance matters;
|
| • |
risks related to fluctuations in commodity prices of metals produced from the Mining Operations other than precious metals or cobalt;
|
| • |
risks related to claims and legal proceedings against Wheaton or the Mining Operations;
|
| • |
risks related to the market price of the Common Shares of Wheaton;
|
| • |
the ability of Wheaton and the Mining Operations to retain key management employees or procure the services of skilled and experienced personnel;
|
| • |
risks related to interest rates;
|
| • |
risks related to the declaration, timing and payment of dividends;
|
| • |
risks related to access to confidential information regarding Mining Operations;
|
| • |
risks associated with multiple listings of the Common Shares on the LSE, NYSE and TSX;
|
| • |
risks associated with a possible suspension of trading of Common Shares;
|
| • |
risks associated with the sale of Common Shares under the at-the-market equity program, including the amount of any net proceeds from such offering of Common Shares and the use of any such proceeds;
|
| • |
equity price risks related to Wheaton’s holding of long‑term investments in other companies;
|
| • |
risks relating to activist shareholders;
|
| • |
risks relating to reputational damage;
|
| • |
risks relating to expression of views by industry analysts;
|
| • |
risks related to the impacts of climate change and the transition to a low-carbon economy;
|
| • |
risks associated with the ability to achieve climate change and environmental commitments at Wheaton and at the Mining Operations;
|
| • |
risks related to ensuring the security and safety of information systems, including cyber security risks;
|
| • |
risks relating to generative artificial intelligence;
|
| • |
risks relating to compliance with anti-corruption and anti-bribery laws;
|
| • |
risks relating to corporate governance and public disclosure compliance;
|
| • |
risks of significant impacts on Wheaton or the Mining Operations as a result of an epidemic or pandemic;
|
| • |
risks related to the adequacy of internal control over financial reporting; and
|
| • |
other risks discussed in the section entitled "Description of the Business – Risk Factors" in Wheaton's Annual Information Form available on SEDAR+ at www.sedarplus.ca and Wheaton's Form 40-F for the year ended December 31, 2022 on file with the U.S. Securities and Exchange Commission on EDGAR (the "Disclosure”).
|
| • |
the payment of $625 million to Montage and the satisfaction of each party's obligations in accordance with the terms of the Koné Gold PMPA;
|
| • |
the advance by the Company of up to $75 million to Montage in connection with the Facility and the receipt by the Company of all amounts owing under the Facility, including, but not limited to, interest;
|
| • |
the payment of $125 million to Rio2 and the satisfaction of each party's obligations in accordance with the terms of the Fenix PMPA;
|
| • |
the advance by the Company of up to $20 million to Rio2 in connection with the Rio2 standby loan facility and the receipt by WPMI of all amounts owing under the Rio2 standby loan facility, including, but not limited
to, interest;
|
| • |
that there will be no material adverse change in the market price of commodities;
|
| • |
that the Mining Operations will continue to operate and the mining projects will be completed in accordance with public statements and achieve their stated production estimates;
|
| • |
that the mineral reserves and mineral resource estimates from Mining Operations (including reserve conversion rates) are accurate;
|
| • |
that public disclosure and other information Wheaton receives from the owners and operators of the Mining Operations is accurate and complete;
|
| • |
that the production estimates from Mining Operations are accurate;
|
| • |
that each party will satisfy their obligations in accordance with the PMPAs;
|
| • |
that Wheaton will continue to be able to fund or obtain funding for outstanding commitments;
|
| • |
that Wheaton will be able to source and obtain accretive PMPAs;
|
| • |
that the terms and conditions of a PMPA are sufficient to recover liabilities owed to the Company;
|
| • |
that Wheaton has fully considered the value and impact of any third-party interests in PMPAs;
|
| • |
that expectations regarding the resolution of legal and tax matters will be achieved (including CRA audits involving the Company);
|
| • |
that Wheaton has properly considered the application of Canadian tax laws to its structure and operations and that Wheaton will be able to pay taxes when due;
|
| • |
that Wheaton has filed its tax returns and paid applicable taxes in compliance with Canadian tax laws;
|
| • |
that Wheaton's application of the CRA Settlement is accurate (including the Company's assessment that there has been no material change in the Company's facts or change in law or jurisprudence);
|
| • |
that Wheaton’s assessment of the tax exposure and impact on the Company and its subsidiaries of the implementation of a 15% global minimum tax is accurate;
|
| • |
that any sale of Common Shares under the at-the-market equity program will not have a significant impact on the market price of the Common Shares and that the net proceeds of sales of Common Shares, if any, will be
used as anticipated;
|
| • |
that the trading of the Common Shares will not be adversely affected by the differences in liquidity, settlement and clearing systems as a result of multiple listings of the Common Shares on the LSE, the TSX and the
NYSE;
|
| • |
that the trading of the Company’s Common Shares will not be suspended;
|
| • |
the estimate of the recoverable amount for any PMPA with an indicator of impairment;
|
| • |
that neither Wheaton nor the Mining Operations will suffer significant impacts as a result of an epidemic or pandemic; and
|
| • |
such other assumptions and factors as set out in the Disclosure.
|

|
Highlights
|
5
|
|
Outlook
|
6
|
|
Mineral Stream Interests
|
7
|
|
Updates on the Operating Mineral Stream Interests
|
8
|
|
Updates on the Development Stage Mineral Stream Interests
|
9
|
|
Mineral Royalty Interests
|
11
|
|
Long-Term Equity Investments
|
11
|
|
Summary of Units Produced
|
14
|
|
Summary of Units Sold
|
15
|
|
Quarterly Financial Review
|
16
|
|
Results of Operations and Operational Review
|
17
|
|
General and Administrative
|
26
|
|
Share Based Compensation
|
27
|
|
Donations and Community Investments
|
27
|
|
Other Income (Expense)
|
27
|
|
Finance Costs
|
28
|
|
Income Tax Expense (Recovery)
|
28
|
|
Liquidity and Capital Resources
|
29
|
|
Share Capital
|
38
|
|
Financial Instruments
|
38
|
|
New Accounting Standards Effective in 2024
|
39
|
|
Future Changes to Accounting Policies
|
39
|
|
Non-IFRS Measures
|
40
|
|
Subsequent Events
|
44
|
|
Controls and Procedures
|
44
|
|
Attributable Reserves and Resources
|
46
|
| Cautionary Note Regarding Forward-Looking Statements |
53 |
|
|
|
|
Q3 2024
|
|
|
Q3 2023
|
|
Change
|
|
|
YTD 2024
|
|
|
YTD 2023
|
|
Change
|
|
Units produced
|
|
|
|
|
|
|
|
|
||||||||
|
Gold ounces
|
|
|
87,199
|
|
105,027
|
(17.0)%
|
|
|
262,698
|
|
261,226
|
0.6 %
|
||||
|
Silver ounces
|
|
|
4,554
|
|
3,397
|
34.1 %
|
|
|
15,083
|
|
12,985
|
16.2 %
|
||||
|
Palladium ounces
|
|
|
4,034
|
|
4,006
|
0.7 %
|
|
|
12,835
|
|
11,591
|
10.7 %
|
||||
|
Cobalt pounds
|
|
|
397
|
|
183
|
117.6 %
|
|
|
896
|
|
458
|
95.5 %
|
||||
|
Gold equivalent ounces 2
|
|
|
144,164
|
|
147,278
|
(2.1)%
|
|
|
448,388
|
|
419,330
|
6.9 %
|
||||
|
Units sold
|
|
|
|
|
|
|
|
|
||||||||
|
Gold ounces
|
|
|
75,694
|
|
74,426
|
1.7 %
|
|
|
245,039
|
|
212,325
|
15.4 %
|
||||
|
Silver ounces
|
|
|
3,875
|
|
2,965
|
30.7 %
|
|
|
11,765
|
|
11,151
|
5.5 %
|
||||
|
Palladium ounces
|
|
|
3,761
|
|
4,242
|
(11.3)%
|
|
|
12,836
|
|
10,580
|
21.3 %
|
||||
|
Cobalt pounds
|
|
|
88
|
|
198
|
(55.6)%
|
|
|
485
|
|
786
|
(38.3)%
|
||||
|
Gold equivalent ounces 2
|
|
|
122,715
|
|
111,935
|
9.6 %
|
|
|
389,907
|
|
350,961
|
11.1 %
|
||||
|
Change in PBND and Inventory 3
|
|
|
|
|
|
|
|
|
||||||||
|
Gold ounces
|
|
|
7,954
|
|
25,799
|
17,845
|
|
|
5,066
|
|
28,153
|
23,087
|
||||
|
Silver ounces
|
|
|
(53)
|
|
(303)
|
(250)
|
|
|
946
|
|
(527)
|
(1,473)
|
||||
|
Palladium ounces
|
|
|
168
|
|
(515)
|
(683)
|
|
|
(480)
|
|
509
|
989
|
||||
|
Cobalt pounds
|
|
|
282
|
|
(28)
|
(310)
|
|
|
351
|
|
(358)
|
(709)
|
||||
|
Gold equivalent ounces 2
|
|
|
9,267
|
|
|
21,869
|
|
12,602
|
|
|
17,989
|
|
|
20,020
|
|
2,031
|
|
Per unit metrics
|
|
|
|
|
|
|
|
|
||||||||
|
Sales price
|
|
|
|
|
|
|
|
|
||||||||
|
Gold per ounce
|
|
$
|
2,491
|
|
$
|
1,944
|
28.1 %
|
|
$
|
2,291
|
|
$
|
1,947
|
17.7 %
|
||
|
Silver per ounce
|
|
$
|
29.71
|
|
$
|
23.73
|
25.2 %
|
|
$
|
27.46
|
|
$
|
23.60
|
16.4 %
|
||
|
Palladium per ounce
|
|
$
|
969
|
|
$
|
1,251
|
(22.5)%
|
|
$
|
976
|
|
$
|
1,410
|
(30.8)%
|
||
|
Cobalt per pound
|
|
$
|
10.65
|
|
$
|
13.87
|
(23.2)%
|
|
$
|
14.71
|
|
$
|
14.13
|
4.1 %
|
||
|
Gold equivalent per ounce 2
|
|
$
|
2,512
|
|
$
|
1,993
|
26.0 %
|
|
$
|
2,319
|
|
$
|
2,002
|
15.8 %
|
||
|
Cash costs 4
|
|
|
|
|
|
|
|
|
||||||||
|
Gold per ounce 4
|
|
$
|
440
|
|
$
|
444
|
0.9 %
|
|
$
|
440
|
|
$
|
465
|
5.4 %
|
||
|
Silver per ounce 4
|
|
$
|
5.03
|
|
$
|
5.10
|
1.4 %
|
|
$
|
4.91
|
|
$
|
5.05
|
2.8 %
|
||
|
Palladium per ounce 4
|
|
$
|
173
|
|
$
|
223
|
22.4 %
|
|
$
|
177
|
|
$
|
255
|
30.6 %
|
||
|
Cobalt per pound 4, 5
|
|
$
|
2.15
|
|
$
|
3.66
|
41.3 %
|
|
$
|
2.84
|
|
$
|
3.36
|
15.5 %
|
||
|
Gold equivalent per ounce 2, 4
|
|
$
|
437
|
|
$
|
445
|
1.8 %
|
|
$
|
434
|
|
$
|
457
|
5.0 %
|
||
|
Cash operating margin 4
|
|
|
|
|
|
|
|
|
||||||||
|
Gold per ounce 4
|
|
$
|
2,051
|
|
$
|
1,500
|
36.7 %
|
|
$
|
1,851
|
|
$
|
1,482
|
24.9 %
|
||
|
Silver per ounce 4
|
|
$
|
24.68
|
|
$
|
18.63
|
32.5 %
|
|
$
|
22.55
|
|
$
|
18.55
|
21.6 %
|
||
|
Palladium per ounce 4
|
|
$
|
796
|
|
$
|
1,028
|
(22.6)%
|
|
$
|
799
|
|
$
|
1,155
|
(30.8)%
|
||
|
Cobalt per pound 4
|
|
$
|
8.50
|
|
$
|
10.21
|
(16.7)%
|
|
$
|
11.87
|
|
$
|
10.77
|
10.2 %
|
||
|
Gold equivalent per ounce 2, 4
|
|
$
|
2,075
|
|
$
|
1,548
|
|
34.0 %
|
|
$
|
1,885
|
|
$
|
1,545
|
|
22.0 %
|
|
Total revenue
|
|
$
|
308,253
|
|
$
|
223,137
|
38.1 %
|
|
$
|
904,123
|
|
$
|
702,573
|
28.7 %
|
||
|
Gold revenue
|
|
$
|
188,521
|
|
$
|
144,707
|
30.3 %
|
|
$
|
561,360
|
|
$
|
413,414
|
35.8 %
|
||
|
Silver revenue
|
|
$
|
115,149
|
|
$
|
70,372
|
63.6 %
|
|
$
|
323,098
|
|
$
|
263,129
|
22.8 %
|
||
|
Palladium revenue
|
|
$
|
3,644
|
|
$
|
5,307
|
(31.3)%
|
|
$
|
12,531
|
|
$
|
14,922
|
(16.0)%
|
||
|
Cobalt revenue
|
|
$
|
939
|
|
$
|
2,751
|
(65.9)%
|
|
$
|
7,134
|
|
$
|
11,108
|
(35.8)%
|
||
|
Net earnings
|
|
$
|
154,635
|
|
$
|
116,371
|
32.9 %
|
|
$
|
440,993
|
|
$
|
369,209
|
19.4 %
|
||
|
Per share
|
|
$
|
0.341
|
|
$
|
0.257
|
32.7 %
|
|
$
|
0.973
|
|
$
|
0.815
|
19.4 %
|
||
|
Adjusted net earnings 4
|
|
$
|
152,803
|
|
$
|
121,467
|
25.8 %
|
|
$
|
441,201
|
|
$
|
368,481
|
19.7 %
|
||
|
Per share 4
|
|
$
|
0.337
|
|
$
|
0.268
|
25.7 %
|
|
$
|
0.973
|
|
$
|
0.814
|
19.5 %
|
||
|
Operating cash flows
|
|
$
|
254,337
|
|
$
|
171,103
|
48.6 %
|
|
$
|
708,110
|
|
$
|
508,584
|
39.2 %
|
||
|
Per share 4
|
|
$
|
0.561
|
|
$
|
0.378
|
48.4 %
|
|
$
|
1.562
|
|
$
|
1.123
|
39.1 %
|
||
|
Dividends paid ⁶
|
|
$
|
70,314
|
|
$
|
67,946
|
3.5 %
|
|
$
|
210,847
|
|
$
|
203,794
|
3.5 %
|
||
|
Per share
|
|
$
|
0.155
|
|
$
|
0.150
|
|
3.3 %
|
|
$
|
0.465
|
|
$
|
0.450
|
|
3.3 %
|
| 1) |
All amounts in thousands except gold and palladium ounces produced and sold, per ounce amounts and per share amounts.
|
| 2) |
Gold-equivalent ounces ("GEOs"), which are provided to assist the reader, are based on the following commodity price assumptions: $2,000 per ounce gold; $23.00 per ounce silver; $1,000 per ounce palladium; and $13.00
per pound cobalt; consistent with those used in estimating the Company's production guidance for 2024.
|
| 3) |
Represents the increase (decrease) in payable ounces produced but not delivered (“PBND”) relative to the various mines that the Company derives precious metal from and, for cobalt, the increase (decrease) of payable
pounds PBND and inventory on hand. Payable units PBND will be recognized in future sales as they are delivered to the Company under the terms of their contracts. Payable ounces PBND to Wheaton is expected to average approximately two to three
months of annualized production for both gold and palladium and two months for silver but may vary from quarter to quarter due to a number of factors, including mine ramp-up and the timing of shipments. Please see “Cautionary Note Regarding
Forward-Looking Statements” for material risks, assumptions and important disclosure associated with this information.
|
| 4) |
Refer to discussion on non-IFRS measures beginning on page 40 of this MD&A.
|
| 5) |
Cash cost per pound of cobalt sold during the third quarter of 2023 was net of a previously recorded inventory write-down of $0.1 million (nine months - $1.6 million), resulting in a decrease of $0.51 per pound of
cobalt sold (nine months - $2.05 per pound sold).
|
| 6) |
As at September 30, 2024, cumulative dividends of $2,277 million have been declared and paid by the Company.
|
| • |
For the three months ended September 30, 2024, relative to the comparable period of the prior year:
|
| o |
Production amounted to 144,200 gold equivalent ounces ("GEOs"), a decrease of 2%, with lower production from Salobo and Constancia being partially offset by higher production from Peñasquito.
|
| o |
Sales volumes amounted to 122,700 GEO's, an increase of 10%, primarily due to relative changes to the number of GEOs produced but not delivered (“PBND”).
|
| o |
Revenue increased 38% or $85 million to $308 million (61% gold, 37% silver, 1% palladium and 1% cobalt), with the increase due to a 26% increase in realized commodity prices coupled with the increased sales volume.
|
| o |
Gross margin amounted to $197 million (64% of revenue), representing an increase of $71 million.
|
| o |
Net earnings amounted to $155 million, an increase of $38 million, with the increased gross margin being partially offset by a $28 million tax expense attributable to the enactment of the global minimum tax (“GMT”)
legislation.
|
| o |
Record operating cashflow amounting to $254 million, with the $83 million increase being the result of the higher gross margin.
|
| • |
For the nine months ended September 30, 2024 relative to the comparable period of the prior year:
|
| o |
Production amounted to 448,400 GEOs, an increase of 7%, with increased production from Salobo and Peñasquito being partially offset by lower production at San Dimas, the temporary cessation of production from
Aljustrel and the suspension of operations at Minto.
|
| o |
Sales volumes amounted to 389,900 GEOs, an increase of 11% resulting from the higher production coupled with relative changes to PBND.
|
| o |
Revenue increased 29% or $202 million to $904 million (62% gold, 36% silver, 1% palladium and 1% cobalt), with the increase being primarily due to a 16% increase in realized commodity prices coupled with the 11%
increase in sales volumes.
|
| o |
Gross margin amounted to $555 million (61% of revenue), representing an increase of $159 million.
|
| o |
Net earnings amounted to $441 million, an increase of $72 million with the higher gross margin more than offsetting the tax expense of $78 million attributable to the enactment of the GMT legislation.
|
| o |
Record operating cashflow amounting to $708 million, with the $200 million increase being due primarily to the higher gross margin.
|
| • |
On November 7, 2024, the Board of Directors declared a dividend in the amount of $0.155 per common share.
|
| • |
On October 21, 2024, the Company amended the Fenix PMPA, increasing the amount of attributable gold it is entitled to under the contract.
|
| • |
On October 23, 2024, the Company entered into a PMPA with Montage Gold Corp. (“Montage”) in respect to the Koné Gold Project located in Côte d’Ivoire.
|
| • |
During the third quarter of 2024:
|
| o |
The Company made a quarterly dividend payment of $70 million.
|
| o |
The Company made total upfront cash payments of $30 million relative to the Mineral Park PMPA ($25 million) and the DeLamar royalty ($5 million).
|
|
Total Upfront Consideration
|
|||||||||||
|
Mineral Stream Interests
|
Mine
Owner ¹ |
Location¹
|
Attributable
Production |
Production
Payment Per Unit 2,3 |
Paid to
Sep 30, 2024 3 |
To be Paid 1, 2
|
Total ³
|
Cash Flow Generated to Date ³
|
Units Received & Sold to Date ³
|
Q3-2024
PBND 3, 4 |
Term ¹
|
|
Gold
|
|||||||||||
|
Salobo
|
Vale
|
BRA
|
75%
|
$425
|
$ 3,429,360
|
$ 163,000
|
$ 3,592,360
|
$ 2,487,127
|
2,139,180
|
71,380
|
LOM
|
|
Sudbury ⁵
|
Vale
|
CAN
|
70%
|
$400
|
623,572
|
-
|
623,572
|
311,817
|
290,773
|
10,506
|
20 years ⁵
|
|
Constancia
|
Hudbay
|
PER
|
50%
|
$425
|
135,000
|
-
|
135,000
|
277,797
|
209,752
|
6,537
|
LOM
|
|
San Dimas
|
FM
|
MEX
|
variable ⁶
|
$637
|
220,000
|
-
|
220,000
|
292,455
|
259,017
|
2,325
|
LOM
|
|
Stillwater ⁷
|
Sibanye
|
USA
|
100%
|
18%
|
237,880
|
-
|
237,880
|
94,822
|
66,375
|
5,243
|
LOM
|
|
Other
|
|||||||||||
|
Minto
|
MNTO
|
CAN
|
100% ⁸
|
50%
|
47,283
|
-
|
47,283
|
230,824
|
231,091
|
-
|
LOM
|
|
Copper World
|
Hudbay
|
USA
|
100%
|
$450
|
-
|
39,296
|
39,296
|
-
|
-
|
-
|
LOM
|
|
Marmato ⁹
|
Aris
|
CO
|
10.5% ⁹
|
18%
|
45,400
|
117,600
|
163,000
|
14,487
|
9,096
|
167
|
LOM
|
|
Santo Domingo
|
Capstone
|
CHL
|
100% ¹⁰
|
18%
|
29,124
|
260,000
|
289,124
|
1,102
|
447
|
-
|
LOM
|
|
Fenix
|
Rio2
|
CHL
|
6% ¹¹
|
18%
|
25,000
|
25,000
|
50,000
|
-
|
-
|
-
|
LOM
|
|
Blackwater
|
Artemis
|
CAN
|
8% ¹²
|
35%
|
340,000
|
-
|
340,000
|
-
|
-
|
-
|
LOM
|
|
Curipamba
|
Silvercorp ¹³
|
ECU
|
50% ¹³
|
18%
|
9,814
|
119,165
|
128,979
|
643
|
258
|
-
|
LOM
|
|
Marathon
|
Gen Mining
|
CAN
|
100% ¹⁴
|
18%
|
21,857
|
103,711
|
125,568
|
-
|
-
|
-
|
LOM
|
|
Goose
|
B2Gold
|
CAN
|
2.78% ¹⁵
|
18%
|
83,750
|
-
|
83,750
|
-
|
-
|
-
|
LOM
|
|
Cangrejos
|
Lumina
|
ECU
|
6.6% ¹⁶
|
18%
|
38,900
|
261,100
|
300,000
|
-
|
-
|
-
|
LOM
|
|
Platreef
|
Ivanhoe
|
SA
|
62.5% ¹⁷
|
$100
|
275,300
|
-
|
275,300
|
-
|
-
|
-
|
LOM ¹⁷
|
|
Curraghinalt
|
Dalradian
|
UK
|
3.05% ¹⁸
|
18%
|
20,000
|
55,000
|
75,000
|
-
|
-
|
-
|
LOM
|
|
Kudz Ze Kayah
|
BMC
|
CAN
|
6.875% ¹⁹
|
20%
|
13,860
|
1,800
|
15,660
|
-
|
-
|
-
|
LOM
|
|
|
|
|
|
|
$ 5,596,100
|
$ 1,145,672
|
$ 6,741,772
|
$ 3,711,074
|
3,205,989
|
96,158
|
|
|
Silver
|
|||||||||||
|
Peñasquito
|
Newmont
|
MEX
|
25%
|
$4.50
|
$ 485,000
|
$ -
|
$ 485,000
|
$ 1,502,076
|
85,075
|
1,429
|
LOM
|
|
Antamina
|
Glencore
|
PER
|
33.75% ²⁰
|
20%
|
900,000
|
-
|
900,000
|
744,661
|
46,892
|
584
|
LOM
|
|
Constancia
|
Hudbay
|
PER
|
100%
|
$6.26
|
294,900
|
-
|
294,900
|
256,709
|
18,723
|
302
|
LOM
|
|
Other
|
|||||||||||
|
Los Filos
|
Equinox
|
MEX
|
100%
|
$4.68
|
4,463
|
-
|
4,463
|
42,537
|
2,278
|
67
|
25 years ²¹
|
|
Zinkgruvan
|
Lundin
|
SWE
|
100%
|
$4.68
|
77,866
|
-
|
77,866
|
525,958
|
34,646
|
204
|
LOM
|
|
Stratoni
|
Eldorado
|
GRC
|
100%
|
$11.54
|
57,500
|
-
|
57,500
|
155,868
|
10,378
|
-
|
LOM
|
|
Neves-Corvo
|
Lundin
|
PRT
|
100%
|
$4.50
|
35,350
|
-
|
35,350
|
177,364
|
10,232
|
39
|
50 years ²²
|
|
Aljustrel
|
Almina
|
PRT
|
100% ²³
|
$0.50
|
2,451
|
-
|
2,451
|
48,811
|
4,274
|
-
|
50 years ²²
|
|
Minto
|
MNTO
|
CAN
|
100% ⁸
|
$4.39
|
7,522
|
-
|
7,522
|
28,995
|
1,646
|
-
|
LOM
|
|
Pascua-Lama
|
Barrick
|
CHL/ARG
|
25%
|
$3.90
|
625,000
|
-
|
625,000
|
372,767
|
19,775
|
-
|
LOM
|
|
Copper World
|
Hudbay
|
USA
|
100%
|
$3.90
|
-
|
191,855
|
191,855
|
-
|
-
|
-
|
LOM
|
|
Navidad
|
PAAS
|
ARG
|
12.5%
|
$4.00
|
10,788
|
32,400
|
43,188
|
-
|
-
|
-
|
LOM
|
|
Marmato ⁹
|
Aris
|
CO
|
100% ⁹
|
18%
|
7,600
|
4,400
|
12,000
|
2,881
|
143
|
3
|
LOM
|
|
Cozamin
|
Capstone
|
MEX
|
50% ²⁴
|
10%
|
150,000
|
-
|
150,000
|
50,851
|
2,316
|
120
|
LOM
|
|
Blackwater
|
Artemis
|
CAN
|
50% ¹²
|
18%
|
140,800
|
-
|
140,800
|
-
|
-
|
-
|
LOM
|
|
Curipamba
|
Silvercorp ¹³
|
ECU
|
75% ¹³
|
18%
|
3,540
|
43,084
|
46,624
|
-
|
-
|
-
|
LOM
|
|
Mineral Park
|
Waterton
|
US
|
100%
|
18%
|
50,000
|
65,000
|
115,000
|
-
|
2,149
|
-
|
LOM
|
|
Kudz Ze Kayah
|
BMC
|
CAN
|
6.875% ¹⁹
|
20%
|
24,640
|
3,200
|
27,840
|
-
|
-
|
-
|
LOM
|
|
|
|
|
|
|
$ 2,877,420
|
$ 339,939
|
$ 3,217,359
|
$ 3,909,478
|
238,527
|
2,748
|
|
|
Palladium
|
|||||||||||
|
Stillwater ⁷
|
Sibanye
|
USA
|
4.5% ²⁵
|
18%
|
$ 262,120
|
$ -
|
$ 262,120
|
$ 159,098
|
110,624
|
6,186
|
LOM
|
|
Platreef
|
Ivanhoe
|
SA
|
5.25% ¹⁷
|
30%
|
78,700
|
-
|
78,700
|
-
|
-
|
-
|
LOM ¹⁷
|
|
|
|
|
|
|
$ 340,820
|
$ -
|
$ 340,820
|
$ 159,098
|
110,624
|
6,186
|
|
|
Platinum
|
|||||||||||
|
Marathon
|
Gen Mining
|
CAN
|
22% ¹⁴
|
18%
|
$ 9,367
|
$ 44,448
|
$ 53,815
|
$ -
|
-
|
-
|
LOM
|
|
Platreef
|
Ivanhoe
|
SA
|
5.25% ¹⁷
|
30%
|
57,500
|
-
|
57,500
|
-
|
-
|
-
|
LOM ¹⁷
|
|
|
|
|
|
|
$ 66,867
|
$ 44,448
|
$ 111,315
|
$ -
|
-
|
-
|
|
|
Cobalt
|
|||||||||||
|
Voisey's Bay
|
Vale
|
CAN
|
42.4% ²⁶
|
18%
|
$ 390,000
|
$ -
|
$ 390,000
|
$ 56,343
|
3,483
|
796
|
LOM
|
|
Total PMPAs Currently Owned
|
|
|
$ 9,135,007
|
$ 1,530,059
|
$ 10,665,066
|
$ 7,835,993
|
|
|
|
||
|
Terminated / Matured PMPAs
|
1,303,697
|
-
|
$ 1,303,697
|
3,117,152
|
|||||||
|
Total
|
|
|
|
|
$ 10,438,704
|
$ 1,530,059
|
$ 11,968,763
|
$ 10,953,145
|
|
|
|
| 1) |
Abbreviations as follows: FM = First Majestic Silver Corp; MNTO = Minto Metals Corp.; PAAS = Pan American Silver Corp; ARG = Argentina; BRA = Brazil; CAN = Canada; CHL = Chile; CO = Colombia; ECU = Ecuador; GRC =
Greece; MEX = Mexico; PER = Peru; PRT = Portugal; SA = South Africa; SWE = Sweden; USA = United States; UK = United Kingdom; and LOM = Life of Mine.
|
| 2) |
Please refer to the section entitled “Contractual Obligations and Contingencies – Mineral Stream Interests” on page 33 of this MD&A for more information.
|
| 3) |
All figures in thousands except gold and palladium ounces and per ounce amounts. The total upfront consideration paid to date excludes closing costs and capitalized interest, where applicable. Please refer to the
section entitled “Other Contractual Obligations and Contingencies” on page 35 of this MD&A for details of when the remaining upfront consideration is forecasted to be paid. Certain contracts, including Santo Domingo and Curipamba, contain
delay ounce provisions whereby should construction of the mine not be completed by an agreed to date, the mine operator must compensate the Company for the delay until certain conditions are satisfied by delivering additional ounces. The value
of these ounces on the date first due, net of amounts owed to the mine operator, is treated as a reduction to the upfront consideration paid. Sale of the resulting ounces received is treated as revenue, with the associated cost of sales being
equal to the fair value of the ounces on the date received.
|
| 4) |
Payable gold, silver, palladium and cobalt PBND are based on management estimates. These figures may be updated in the future as additional information is received. Please see “Cautionary Note Regarding
Forward-Looking Statements” for material risks, assumptions and important disclosure associated with this information.
|
| 5) |
Comprised of the operating Coleman, Copper Cliff, Garson, Creighton and Totten gold interests as well as the non-operating Stobie and Victor gold interests. As of September 30, 2024, the Company has received
approximately $312 million of operating cash flows from the Sudbury stream. Should the market value of gold delivered to Wheaton through the 20-year term of the contract, net of the per ounce cash payment, be lower than the initial $670 million
refundable deposit, the Company will be entitled to a refund of the difference at the conclusion of the term. The term of the Sudbury PMPA ends on May 11, 2033.
|
| 6) |
The original San Dimas SPA, entered into on October 15, 2004, was terminated on May 10, 2018 and concurrently the Company entered into the new San Dimas PMPA. Under the terms of the San Dimas PMPA, the Company is
entitled to an amount equal to 25% of the payable gold production plus an additional amount of gold equal to 25% of the payable silver production converted to gold at a fixed gold to silver exchange ratio of 70:1 from the San Dimas mine. If the
average gold to silver price ratio decreases to less than 50:1 or increases to more than 90:1 for a period of 6 months or more, then the "70" shall be revised to "50" or "90", as the case may be, until such time as the average gold to silver
price ratio is between 50:1 to 90:1 for a period of 6 months or more in which event the "70" shall be reinstated. The current ratio is 70:1.
|
| 7) |
Comprised of the Stillwater and East Boulder gold and palladium interests.
|
| 8) |
The Company is entitled to acquire 100% of the first 30,000 ounces of gold produced per annum and 50% thereafter. On May 13, 2023, Minto Metals Corp. announced the suspension of operations at the Minto mine.
|
| 9) |
Once the Company has received 310,000 ounces of gold and 2.15 million ounces of silver under the Marmato PMPA, the attributable gold and silver production will be reduced to 5.25% and 50%, respectively.
|
| 10) |
Once the Company has received 285,000 ounces of gold under the Santo Domingo PMPA, the Company’s attributable gold production will be reduced to 67%. The units sold under Santo Domingo relate to ounces received due to
the delay ounce provision (see footnote 3, above).
|
| 11) |
Once the Company has received 90,000 ounces of gold under the Fenix PMPA, the attributable gold production will reduce to 4% until 140,000 ounces have been delivered, after which the stream drops to 3.5%.
|
| 12) |
Once the Company has received 464,000 ounces of gold under the amended Blackwater Gold PMPA, the attributable gold production will be reduced to 4%. Once the Company has received 17.8 million ounces of silver under
the Blackwater Silver PMPA, the attributable silver production will be reduced to 33%.
|
| 13) |
Once the Company has received 145,000 ounces of gold under the Curipamba PMPA, the attributable gold production will be reduced to 33%, and once the Company has received 4.6 million ounces of silver, the attributable
silver production will be reduced to 50%. On July 31, 2024, Silvercorp Metals Inc. (“Silvercorp”) completed the previously announced acquisition of all of the issued and outstanding common shares of Adventus Mining Corporation (“Adventus”). The
units sold under Curipamba relate to ounces received due to the delay ounce provision (see footnote 3, above).
|
| 14) |
Once the Company has received 150,000 ounces of gold and 120,000 ounces of platinum under the Marathon PMPA, the attributable gold and platinum production will be reduced to 67% and 15%.
|
| 15) |
Once the Company has received 87,100 ounces of gold under the Goose PMPA, the Company’s attributable gold production will be 1.44%, and once the Company has received 134,000 ounces of gold under the agreement, the
Company’s attributable gold production will be reduced to 1.0%.
|
| 16) |
Once Wheaton has received 700,000 ounces of gold under the Cangrejos PMPA, the Company’s attributable gold production will be reduced to 4.4%.
|
| 17) |
Once the Company has received 218,750 ounces of gold under the Platreef Gold PMPA, the attributable gold production will reduce to 50% until 428,300 ounces have been delivered, after which the stream drops to 3.125%.
Under the Platreef Palladium and Platinum PMPA, once the Company has received 350,000 ounces of combined palladium and platinum, the attributable palladium and platinum production will reduce to 3% until 485,115 ounces have been delivered,
after which the stream drops to 0.1% of the payable palladium and platinum production. If certain thresholds are met, including if production through the Platreef project concentrator achieves 5.5 million tonnes per annum (“Mtpa”), the 3.125%
residual gold stream and the 0.1% residual palladium and platinum stream will terminate. Under the Platreef Gold PMPA, Sandstorm Gold Ltd. (which acquired Nomad Royalty Ltd. on August 15, 2022) (“Sandstorm”) is entitled to purchase 37.5% of
payable gold. The decrease in the percentage of payable metal that Wheaton will be entitled to purchase is conditional on delivery of the total amount of payable gold to all purchasers (Wheaton and Sandstorm combined). The values set out herein
pertain only to Wheaton’s share of the payable gold.
|
| 18) |
Once the Company has received 125,000 ounces of gold under the Curraghinalt PMPA, the Company’s attributable gold production will be reduced to 1.5%.
|
| 19) |
Under the Kudz Ze Kayah PMPA, the Company will be entitled to purchase staged percentages of produced gold and produced silver ranging from 6.875% to 7.375% until 330,000 ounces of gold and 43.30 million ounces of
silver are produced and delivered, thereafter reducing to a range of 5.625% to 6.125% until a further 59,800 ounces of gold and 7.96 million ounces of silver are produced and delivered, further reducing to a range of 5% to 5.5% until a further
270,200 ounces of gold and 35.34 million ounces of silver are produced and delivered for a total of 660,000 ounces of gold and 86.6 million ounces of silver and thereafter ranging between 6.25% and 6.75%.
|
| 20) |
Once Wheaton has received 140 million ounces of silver under the Antamina PMPA, the Company’s attributable silver production will be reduced to 22.5%.
|
| 21) |
The term of the Los Filos PMPA ends on October 15, 2029.
|
| 22) |
The term of the Neves-Corvo and Aljustrel PMPAs ends on June 5, 2057.
|
| 23) |
Wheaton only has the rights to silver contained in concentrate containing less than 15% copper at the Aljustrel mine. On September 12, 2023, it was announced that the production of the zinc and lead concentrates at
the Aljustrel mine will be halted from September 24, 2023 until the second quarter of 2025.
|
| 24) |
Once Wheaton has received 10 million ounces of silver under the Cozamin PMPA, the Company’s attributable silver production will be reduced to 33%.
|
| 25) |
Once the Company has received 375,000 ounces of palladium under the Stillwater PMPA, the Company’s attributable palladium production will be reduced to 2.25%, and once the Company has received 550,000 ounces of
palladium under the agreement, the Company’s attributable palladium production will be reduced to 1%.
|
| 26) |
Once the Company has received 31 million pounds of cobalt under the Voisey’s Bay PMPA, the Company’s attributable cobalt production will be reduced to 21.2%.
|
|
|
Mine
Owner |
|
|
|
|
|
|
|
Attributable
Production to be Purchased |
|
|
|
|
Early Deposit Mineral Stream Interests
|
Location of
Mine |
Upfront
Consideration
Paid to Date 1
|
Upfront
Consideration to be Paid 1, 2 |
Total
Upfront Consideration¹ |
Gold
|
Silver
|
Term of
Agreement |
Date of
Original Contract |
||||
|
Toroparu
|
Aris Mining
|
Guyana
|
$
|
15,500
|
$
|
138,000
|
$
|
153,500
|
10%
|
50%
|
Life of Mine
|
11-Nov-13
|
|
Cotabambas
|
Panoro
|
Peru
|
14,000
|
126,000
|
140,000
|
25% ³
|
100% ³
|
Life of Mine
|
21-Mar-16
|
|||
|
Kutcho
|
Kutcho
|
Canada
|
|
16,852
|
|
58,000
|
|
74,852
|
100%
|
100%
|
Life of Mine
|
14-Dec-17
|
|
|
|
|
$
|
46,352
|
$
|
322,000
|
$
|
368,352
|
|
|
|
|
| 1) |
Expressed in thousands; excludes closing costs and capitalized interest, where applicable.
|
| 2) |
Please refer to the section entitled “Other Contractual Obligations and Contingencies” on page 35 of this MD&A for details of when the remaining upfront consideration is forecast to be paid.
|
| 3) |
Once 90 million silver equivalent ounces attributable to Wheaton have been produced, the attributable production will decrease to 16.67% of gold production and 66.67% of silver production for the life of mine.
|
|
Royalty Interests
|
Mine
Owner |
Location of
Mine |
Royalty 1
|
Upfront
Consideration
Paid to Date 2
|
Upfront
Consideration to be Paid 2 |
Total
Upfront Consideration 2 |
Term of
Agreement |
Date of Original Contract
|
|||
|
Metates
|
Chesapeake
|
Mexico
|
0.5% NSR
|
$
|
3,000
|
$
|
-
|
$
|
3,000
|
Life of Mine
|
07-Aug-2014
|
|
Brewery Creek 3
|
Victoria Gold
|
Canada
|
2.0% NSR
|
3,529
|
-
|
3,529
|
Life of Mine
|
04-Jan-2021
|
|||
|
Black Pine 4
|
Liberty Gold
|
USA
|
0.5% NSR
|
3,600
|
-
|
3,600
|
Life of Mine
|
10-Sep-2023
|
|||
|
Mt Todd 5
|
Vista
|
Australia
|
1.0% GR
|
20,000
|
-
|
20,000
|
Life of Mine
|
13-Dec-2023
|
|||
|
DeLamar 6
|
Integra
|
USA
|
1.5% NSR
|
9,750
|
-
|
9,750
|
Life of Mine
|
20-Feb-2024
|
|||
|
|
|
|
|
$
|
39,879
|
$
|
-
|
$
|
39,879
|
|
|
| 1) |
Abbreviation as follows: NSR = Net Smelter Return Royalty; and GR = Gross Royalty.
|
| 2) |
Expressed in thousands; excludes closing costs.
|
| 3) |
The Company paid $3 million for an existing 2.0% net smelter return royalty interests on the first 600,000 ounces of gold mined and a 2.75% net smelter returns royalty interest thereafter. The Brewery Creek Royalty
agreement provides, among other things, that Golden Predator Mining Corp., (subsidiary of Victoria Gold) may reduce the 2.75% net smelter royalty interest to 2.125% on payment of the sum of Cdn$2 million to the Company.
|
| 4) |
Liberty Gold has been granted an option to repurchase 50% of the NSR for $4 million at any point in time up to the earlier of commercial production at Black Pine or January 1, 2030.
|
| 5) |
The Mt Todd royalty is at a rate of 1% of gross revenue with such rate being subject to increase to a maximum rate of 2%, depending on the timing associated with the achievement of certain operational milestones.
|
| 6) |
Under the DeLamar royalty, if completion is not achieved by January 1, 2029, the DeLamar Royalty will increase annually by 0.15% of net smelter returns to a maximum of 2.7% of net smelter returns.
|
|
September 30
|
December 31
|
|||
|
(in thousands)
|
2024
|
2023
|
||
|
Common shares held
|
$
|
101,373
|
$
|
246,026
|
|
Warrants held
|
|
1,695
|
|
652
|
|
Total long-term equity investments
|
$
|
103,068
|
$
|
246,678
|
|
Three Months Ended September 30, 2024
|
||||||||
|
(in thousands)
|
Shares
Owned (000's) |
% of
Outstanding
Shares Owned
|
Fair Value at
Jun 30, 2024 |
Cost of
Additions
|
Proceeds of
Disposition 1
|
Fair Value
Adjustment
Gains (Losses) 2
|
Fair Value at
Sep 30, 2024 |
Realized Loss
on Disposal
|
|
Kutcho
|
18,640
|
12.03%
|
$ 2,248
|
$ -
|
$ -
|
$ (797)
|
$ 1,451
|
$ -
|
|
B2Gold
|
12,025
|
0.92%
|
32,243
|
-
|
-
|
4,992
|
37,235
|
-
|
|
Silvercorp
|
3,759
|
1.73%
|
-
|
12,017
|
-
|
4,384
|
16,401
|
-
|
|
Aris
|
4,715
|
2.77%
|
17,810
|
-
|
-
|
4,055
|
21,865
|
-
|
|
Other
|
|
|
34,598
|
728
|
(12,018)
|
1,113
|
24,421
|
(3,543)
|
|
Total
|
|
|
$ 86,899
|
$ 12,745
|
$ (12,018)
|
$ 13,747
|
$ 101,373
|
$ (3,543)
|
| 1) |
The disposal during the third quarter was as a result of the acquisition of the companies to which the shares relate by unrelated third party entities.
|
| 2) |
Fair Value Gains (Losses) are reflected as a component of Other Comprehensive Income (“OCI”).
|
|
Three Months Ended September 30, 2023
|
||||||||
|
(in thousands)
|
Shares
Owned (000's) |
% of
Outstanding
Shares Owned
|
Fair Value at
Jun 30, 2023 |
Cost of
Additions
|
Proceeds of
Disposition
|
Fair Value
Adjustment
Gains (Losses) 1
|
Fair Value at
Sep 30, 2023 |
Realized Loss
on Disposal
|
|
Kutcho
|
18,640
|
13.27%
|
$ 2,605
|
$ -
|
$ -
|
$ (881)
|
$ 1,724
|
$ -
|
|
Hecla
|
34,980
|
5.67%
|
180,148
|
-
|
-
|
(43,375)
|
136,773
|
-
|
|
B2Gold
|
12,025
|
0.93%
|
42,867
|
-
|
-
|
(8,181)
|
34,686
|
-
|
|
Aris
|
4,715
|
3.44%
|
11,360
|
-
|
-
|
(584)
|
10,776
|
-
|
|
Other
|
|
|
18,096
|
5,006
|
-
|
(6,483)
|
16,619
|
-
|
|
Total
|
|
|
$ 255,076
|
$ 5,006
|
$ -
|
$ (59,504)
|
$ 200,578
|
$ -
|
| 1) |
Fair Value Gains (Losses) are reflected as a component of OCI.
|
|
Nine Months Ended September 30, 2024
|
||||||||
|
(in thousands)
|
Shares
Owned (000's) |
% of
Outstanding
Shares Owned
|
Fair Value at
Dec 31, 2023 |
Cost of
Additions
|
Proceeds of
Disposition 1
|
Fair Value
Adjustment
Gains (Losses) 2
|
Fair Value at
Sep 30, 2024 |
Realized Gain
(Loss) on
Disposal
|
|
Kutcho
|
18,640
|
12.03%
|
$ 1,551
|
$ -
|
$ -
|
$ (100)
|
$ 1,451
|
$ -
|
|
Hecla
|
-
|
-
|
168,255
|
-
|
(177,088)
|
8,833
|
-
|
35,768
|
|
B2Gold
|
12,025
|
0.92%
|
38,094
|
-
|
-
|
(859)
|
37,235
|
-
|
|
Silvercorp
|
3,759
|
1.73%
|
-
|
12,017
|
-
|
4,384
|
16,401
|
-
|
|
Aris
|
4,715
|
2.77%
|
15,579
|
-
|
-
|
6,286
|
21,865
|
-
|
|
Other
|
|
|
22,547
|
5,849
|
(12,018)
|
8,043
|
24,421
|
(3,543)
|
|
Total
|
|
|
$ 246,026
|
$ 17,866
|
$ (189,106)
|
$ 26,587
|
$ 101,373
|
$ 32,225
|
| 1) |
The disposition of the Hecla shares was made in order to capitalize on Hecla’s share price appreciation, while the disposal under “other” was as a result of the acquisition of the companies to which the shares relate
by unrelated third party entities.
|
| 2) |
Fair Value Gains (Losses) are reflected as a component of OCI.
|
|
Nine Months Ended September 30, 2023
|
||||||||
|
(in thousands)
|
Shares
Owned (000's) |
% of
Outstanding
Shares Owned |
Fair Value at
Dec 31, 2022 |
Cost of
Additions
|
Proceeds of
Disposition 1 |
Fair Value
Adjustment Gains (Losses) 2 |
Fair Value at
Sep 30, 2023 |
Realized Gain
(Loss) on
Disposal
|
|
Sabina
|
-
|
-
|
$ 30,535
|
$ -
|
$ (48,832)
|
$ 18,297
|
$ -
|
$ 872
|
|
Kutcho
|
18,640
|
13.27%
|
3,097
|
-
|
-
|
(1,373)
|
1,724
|
-
|
|
Hecla
|
34,980
|
5.67%
|
194,668
|
-
|
(202)
|
(57,693)
|
136,773
|
73
|
|
B2Gold
|
12,025
|
0.93%
|
-
|
48,832
|
-
|
(14,146)
|
34,686
|
-
|
|
Aris
|
4,715
|
3.44%
|
11,662
|
-
|
-
|
(886)
|
10,776
|
-
|
|
Other
|
|
|
15,573
|
13,205
|
(27)
|
(12,132)
|
16,619
|
(990)
|
|
Total
|
|
|
$ 255,535
|
$ 62,037
|
$ (49,061)
|
$ (67,933)
|
$ 200,578
|
$ (45)
|
| 1) |
The disposal of the Sabina shares was as a result of the acquisition of Sabina by B2Gold, while the partial disposition of the Hecla shares was made in order to capitalize on Hecla’s share price appreciation.
|
| 2) |
Fair Value Gains (Losses) are reflected as a component of OCI.
|
|
|
Q3 2024
|
Q2 2024
|
Q1 2024
|
Q4 2023
|
Q3 2023
|
Q2 2023
|
Q1 2023
|
Q4 2022
|
|
Gold ounces produced ²
|
|
|
|
|
||||
|
Salobo
|
62,689
|
63,225
|
61,622
|
71,778
|
69,045
|
54,804
|
43,677
|
37,939
|
|
Sudbury 3
|
4,287
|
4,477
|
5,618
|
5,823
|
3,857
|
5,818
|
6,203
|
5,270
|
|
Constancia
|
10,446
|
6,086
|
13,897
|
22,292
|
19,003
|
7,444
|
6,905
|
10,496
|
|
San Dimas 4
|
6,882
|
7,089
|
7,542
|
10,024
|
9,995
|
11,166
|
10,754
|
10,037
|
|
Stillwater 5
|
2,247
|
2,099
|
2,637
|
2,341
|
2,454
|
2,017
|
1,960
|
2,185
|
|
Other
|
|
|
|
|
||||
|
Marmato
|
648
|
584
|
623
|
668
|
673
|
639
|
457
|
533
|
|
Minto 6
|
-
|
-
|
-
|
-
|
-
|
1,292
|
3,063
|
2,567
|
|
Total Other
|
648
|
584
|
623
|
668
|
673
|
1,931
|
3,520
|
3,100
|
|
Total gold ounces produced
|
87,199
|
83,560
|
91,939
|
112,926
|
105,027
|
83,180
|
73,019
|
69,027
|
|
Silver ounces produced 2
|
|
|
|
|
||||
|
Peñasquito 7
|
1,785
|
2,263
|
2,643
|
1,036
|
-
|
1,744
|
2,076
|
1,761
|
|
Antamina
|
925
|
992
|
806
|
1,030
|
894
|
984
|
872
|
1,067
|
|
Constancia
|
648
|
451
|
640
|
836
|
697
|
420
|
552
|
655
|
|
Other
|
|
|
|
|
||||
|
Los Filos
|
42
|
27
|
48
|
26
|
32
|
41
|
45
|
14
|
|
Zinkgruvan
|
537
|
699
|
641
|
510
|
785
|
374
|
632
|
664
|
|
Neves-Corvo
|
425
|
432
|
524
|
573
|
486
|
407
|
436
|
369
|
|
Aljustrel 8
|
-
|
-
|
-
|
-
|
327
|
279
|
343
|
313
|
|
Cozamin
|
185
|
177
|
173
|
185
|
165
|
184
|
141
|
157
|
|
Marmato
|
7
|
6
|
7
|
10
|
11
|
7
|
8
|
9
|
|
Yauliyacu 9
|
-
|
-
|
-
|
-
|
-
|
-
|
-
|
261
|
|
Minto 6
|
-
|
-
|
-
|
-
|
-
|
14
|
29
|
33
|
|
Total Other
|
1,196
|
1,341
|
1,393
|
1,304
|
1,806
|
1,306
|
1,634
|
1,820
|
|
Total silver ounces produced
|
4,554
|
5,047
|
5,482
|
4,206
|
3,397
|
4,454
|
5,134
|
5,303
|
|
Palladium ounces produced ²
|
|
|
|
|
||||
|
Stillwater 5
|
4,034
|
4,338
|
4,463
|
4,209
|
4,006
|
3,880
|
3,705
|
3,869
|
|
Cobalt pounds produced ²
|
|
|
|
|
||||
|
Voisey's Bay
|
397
|
259
|
240
|
215
|
183
|
152
|
124
|
128
|
|
GEOs produced 10
|
144,164
|
145,449
|
158,775
|
164,796
|
147,278
|
137,323
|
134,730
|
132,780
|
|
Average payable rate 2
|
|
|
|
|
|
|
||
|
Gold
|
95.1%
|
95.0%
|
94.7%
|
95.1%
|
95.4%
|
95.1%
|
95.1%
|
94.9%
|
|
Silver
|
83.9%
|
84.3%
|
84.5%
|
83.0%
|
78.4%
|
83.7%
|
83.1%
|
84.2%
|
|
Palladium
|
98.4%
|
97.3%
|
97.8%
|
98.0%
|
94.1%
|
94.1%
|
96.3%
|
93.9%
|
|
Cobalt
|
93.3%
|
93.3%
|
93.3%
|
93.3%
|
93.3%
|
93.3%
|
93.3%
|
93.3%
|
|
GEO 10
|
91.1%
|
90.7%
|
90.7%
|
91.6%
|
90.9%
|
90.9%
|
89.8%
|
89.9%
|
| 1) |
All figures in thousands except gold and palladium ounces produced.
|
| 2) |
Quantity produced represent the amount of gold, silver, palladium and cobalt contained in concentrate or doré prior to smelting or refining deductions. Production figures and payable rates are based on information
provided by the operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures and payable rates may be updated in
future periods as additional information is received.
|
| 3) |
Comprised of the Coleman, Copper Cliff, Garson, Creighton and Totten gold interests.
|
| 4) |
Under the terms of the San Dimas PMPA, the Company is entitled to an amount equal to 25% of the payable gold production plus an additional amount of gold equal to 25% of the payable silver production converted to gold
at a fixed gold to silver exchange ratio of 70:1 from the San Dimas mine. If the average gold to silver price ratio decreases to less than 50:1 or increases to more than 90:1 for a period of 6 months or more, then the "70" shall be revised to
"50" or "90", as the case may be, until such time as the average gold to silver price ratio is between 50:1 to 90:1 for a period of 6 months or more in which event the "70" shall be reinstated. For reference, attributable silver production from
prior periods is as follows: Q3 2024 - 262,000 ounces; Q2 2024 - 285,000 ounces; Q1 2024 - 291,000 ounces; Q4 2023 - 378,000 ounces; Q3 2023 - 387,000 ounces; Q2 2023 - 423,000 ounces; Q1 2023 - 401,000 ounces; Q4 2022 - 348,000 ounces.
|
| 5) |
Comprised of the Stillwater and East Boulder gold and palladium interests.
|
| 6) |
On May 13, 2023, Minto Metals Corp. announced the suspension of operations at the Minto mine.
|
| 7) |
There was a temporary suspension of operations at Peñasquito due to a labour strike which ran from June 7, 2023 to October 13, 2023.
|
| 8) |
On September 12, 2023, it was announced that the production of the zinc and lead concentrates at the Aljustrel mine will be halted from September 24, 2023 until the second quarter of 2025.
|
| 9) |
On December 14, 2022, the Company terminated the Yauliyacu PMPA in exchange for a cash payment of $132 million.
|
| 10) |
GEOs, which are provided to assist the reader, are based on the following commodity price assumptions: $2,000 per ounce gold; $23.00 per ounce silver; $1,000 per ounce palladium; and $13.00 per pound cobalt;
consistent with those used in estimating the Company's production guidance for 2024.
|
|
|
Q3 2024
|
Q2 2024
|
Q1 2024
|
Q4 2023
|
Q3 2023
|
Q2 2023
|
Q1 2023
|
Q4 2022
|
|
Gold ounces sold
|
|
|
|
|
||||
|
Salobo
|
58,101
|
54,962
|
56,841
|
76,656
|
44,444
|
46,030
|
35,966
|
41,029
|
|
Sudbury 2
|
2,495
|
5,679
|
4,129
|
5,011
|
4,836
|
4,775
|
4,368
|
4,988
|
|
Constancia
|
5,186
|
6,640
|
20,123
|
19,925
|
12,399
|
9,619
|
6,579
|
6,013
|
|
San Dimas
|
7,022
|
6,801
|
7,933
|
10,472
|
9,695
|
11,354
|
10,651
|
10,943
|
|
Stillwater 3
|
1,635
|
2,628
|
2,355
|
2,314
|
1,985
|
2,195
|
2,094
|
1,783
|
|
Other
|
|
|
|
|
||||
|
Marmato
|
550
|
616
|
638
|
633
|
792
|
467
|
480
|
473
|
|
777
|
-
|
-
|
-
|
-
|
275
|
153
|
126
|
785
|
|
Minto
|
-
|
-
|
-
|
-
|
-
|
701
|
2,341
|
2,982
|
|
Santo Domingo 4
|
447
|
-
|
-
|
-
|
-
|
-
|
-
|
-
|
|
Curipamba 4
|
258
|
-
|
-
|
-
|
-
|
-
|
-
|
-
|
|
Total Other
|
1,255
|
616
|
638
|
633
|
1,067
|
1,321
|
2,947
|
4,240
|
|
Total gold ounces sold
|
75,694
|
77,326
|
92,019
|
115,011
|
74,426
|
75,294
|
62,605
|
68,996
|
|
Silver ounces sold
|
|
|
|
|
||||
|
Peñasquito
|
1,667
|
1,482
|
1,839
|
442
|
453
|
1,913
|
1,483
|
2,066
|
|
Antamina
|
989
|
917
|
762
|
1,091
|
794
|
963
|
814
|
1,114
|
|
Constancia
|
366
|
422
|
726
|
665
|
435
|
674
|
366
|
403
|
|
Other
|
|
|
|
|
||||
|
Los Filos
|
26
|
24
|
44
|
24
|
30
|
37
|
34
|
16
|
|
Zinkgruvan
|
488
|
597
|
297
|
449
|
714
|
370
|
520
|
547
|
|
Neves-Corvo
|
185
|
216
|
243
|
268
|
245
|
132
|
171
|
80
|
|
Aljustrel
|
-
|
-
|
1
|
86
|
142
|
182
|
205
|
156
|
|
Cozamin
|
148
|
158
|
147
|
141
|
139
|
150
|
119
|
150
|
|
Marmato
|
6
|
7
|
8
|
9
|
11
|
7
|
7
|
7
|
|
Yauliyacu
|
-
|
-
|
-
|
-
|
-
|
-
|
-
|
337
|
|
Minto
|
-
|
-
|
-
|
-
|
-
|
7
|
29
|
23
|
|
Keno Hill
|
-
|
-
|
-
|
-
|
-
|
-
|
1
|
1
|
|
777
|
-
|
-
|
-
|
-
|
2
|
2
|
-
|
35
|
|
Total Other
|
853
|
1,002
|
740
|
977
|
1,283
|
887
|
1,086
|
1,352
|
|
Total silver ounces sold
|
3,875
|
3,823
|
4,067
|
3,175
|
2,965
|
4,437
|
3,749
|
4,935
|
|
Palladium ounces sold
|
|
|
|
|
||||
|
Stillwater 3
|
3,761
|
4,301
|
4,774
|
3,339
|
4,242
|
3,392
|
2,946
|
3,396
|
|
Cobalt pounds sold
|
|
|
|
|
||||
|
Voisey's Bay
|
88
|
88
|
309
|
288
|
198
|
265
|
323
|
187
|
|
GEOs sold 5
|
122,715
|
124,009
|
143,184
|
155,059
|
111,935
|
129,734
|
109,293
|
128,662
|
|
Cumulative payable units PBND 6
|
|
|
|
|
|
|
|
|
|
Gold ounces
|
96,158
|
88,205
|
86,114
|
91,092
|
98,715
|
72,916
|
77,377
|
70,562
|
|
Silver ounces
|
2,748
|
2,801
|
2,368
|
1,802
|
1,486
|
1,790
|
2,531
|
2,013
|
|
Palladium ounces
|
6,186
|
6,018
|
6,198
|
6,666
|
5,607
|
6,122
|
5,751
|
5,098
|
|
Cobalt pounds
|
796
|
513
|
360
|
356
|
377
|
251
|
285
|
258
|
|
GEO 5
|
136,027
|
126,761
|
118,785
|
117,465
|
121,058
|
98,186
|
111,217
|
97,936
|
|
Inventory on hand
|
|
|
|
|
|
|
|
|
|
Cobalt pounds
|
-
|
-
|
-
|
88
|
155
|
310
|
398
|
633
|
| 1) |
All figures in thousands except gold and palladium ounces sold.
|
| 2) |
Comprised of the Coleman, Copper Cliff, Garson, Creighton and Totten gold interests.
|
| 3) |
Comprised of the Stillwater and East Boulder gold and palladium interests.
|
| 4) |
The ounces sold under Santo Domingo and Curipamba relate to ounces received due to the delay ounce provision as per the respective PMPA (see footnote 3 on page 8 of this MD&A for more information).
|
| 5) |
GEOs, which are provided to assist the reader, are based on the following commodity price assumptions: $2,000 per ounce gold; $23.00 per ounce silver; $1,000 per ounce palladium; and $13.00 per pound
cobalt; consistent with those used in estimating the Company's production guidance for 2024.
|
| 6) |
Payable gold, silver and palladium ounces PBND and cobalt pounds PBND are based on management estimates. These figures may be updated in future periods as additional information is received.
|
|
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
|
Q3 2024
|
Q2 2024
|
Q1 2024
|
Q4 2023
|
Q3 2023
|
Q2 2023
|
Q1 2023
|
Q4 2022
|
||||||||||||||||
|
Gold ounces sold
|
xx
|
xx
|
75,694
|
xx
|
xx
|
77,326
|
xx
|
xx
|
92,019
|
xx
|
xx
|
115,011
|
xx
|
xx
|
74,426
|
xx
|
xx
|
75,294
|
xx
|
xx
|
62,605
|
xx
|
xx
|
68,996
|
|
Realized price 2
|
|
$
|
2,491
|
|
$
|
2,356
|
|
$
|
2,072
|
|
$
|
2,006
|
|
$
|
1,944
|
|
$
|
1,986
|
|
$
|
1,904
|
|
$
|
1,725
|
|
Gold sales
|
|
$
|
188,521
|
|
$
|
182,150
|
|
$
|
190,689
|
|
$
|
230,716
|
|
$
|
144,707
|
|
$
|
149,511
|
|
$
|
119,196
|
|
$
|
119,051
|
|
Silver ounces sold
|
|
|
3,875
|
|
|
3,823
|
|
|
4,067
|
|
|
3,175
|
2,965
|
4,437
|
3,749
|
4,935
|
||||||||
|
Realized price 2
|
|
$
|
29.71
|
|
$
|
29.11
|
|
$
|
23.77
|
|
$
|
23.77
|
|
$
|
23.73
|
|
$
|
24.13
|
|
$
|
22.85
|
|
$
|
21.52
|
|
Silver sales
|
|
$
|
115,149
|
|
$
|
111,291
|
|
$
|
96,658
|
|
$
|
75,465
|
|
$
|
70,372
|
|
$
|
107,081
|
|
$
|
85,678
|
|
$
|
106,175
|
|
Palladium ounces sold
|
|
|
3,761
|
|
|
4,301
|
|
|
4,774
|
|
|
3,339
|
4,242
|
3,392
|
2,946
|
3,396
|
||||||||
|
Realized price 2
|
|
$
|
969
|
|
$
|
979
|
|
$
|
980
|
|
$
|
1,070
|
|
$
|
1,251
|
|
$
|
1,438
|
|
$
|
1,607
|
|
$
|
1,939
|
|
Palladium sales
|
|
$
|
3,644
|
|
$
|
4,210
|
|
$
|
4,677
|
|
$
|
3,574
|
|
$
|
5,307
|
|
$
|
4,879
|
|
$
|
4,735
|
|
$
|
6,586
|
|
Cobalt pounds sold
|
|
|
88
|
|
|
88
|
|
|
309
|
|
|
288
|
198
|
265
|
323
|
187
|
||||||||
|
Realized price 2
|
|
$
|
10.65
|
|
$
|
16.02
|
|
$
|
15.49
|
|
$
|
12.92
|
|
$
|
13.87
|
|
$
|
13.23
|
|
$
|
15.04
|
|
$
|
22.62
|
|
Cobalt sales
|
|
$
|
939
|
|
$
|
1,413
|
|
$
|
4,782
|
|
$
|
3,716
|
|
$
|
2,751
|
|
$
|
3,501
|
|
$
|
4,856
|
|
$
|
4,239
|
|
Total sales
|
|
$
|
308,253
|
|
$
|
299,064
|
|
$
|
296,806
|
|
$
|
313,471
|
|
$
|
223,137
|
|
$
|
264,972
|
|
$
|
214,465
|
|
$
|
236,051
|
|
Cash cost 2, 3
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||
|
Gold / oz
|
|
$
|
440
|
|
$
|
441
|
|
$
|
439
|
|
$
|
437
|
$
|
444
|
$
|
461
|
$
|
496
|
$
|
475
|
||||
|
Silver / oz
|
|
$
|
5.03
|
|
$
|
4.95
|
|
$
|
4.77
|
|
$
|
5.02
|
$
|
5.10
|
$
|
5.01
|
$
|
5.07
|
$
|
5.00
|
||||
|
Palladium / oz
|
|
$
|
173
|
|
$
|
175
|
|
$
|
182
|
|
$
|
198
|
$
|
223
|
$
|
261
|
$
|
294
|
$
|
357
|
||||
|
Cobalt / lb 5
|
|
$
|
2.15
|
|
$
|
3.11
|
|
$
|
2.96
|
|
$
|
3.14
|
|
$
|
3.66
|
|
$
|
3.20
|
|
$
|
3.30
|
|
$
|
16.52
|
|
Depletion 2
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||
|
Gold / oz 4
|
|
$
|
418
|
|
$
|
438
|
|
$
|
404
|
|
$
|
405
|
$
|
381
|
$
|
365
|
$
|
360
|
$
|
357
|
||||
|
Silver / oz
|
|
$
|
5.89
|
|
$
|
5.76
|
|
$
|
5.03
|
|
$
|
5.29
|
$
|
4.57
|
$
|
4.92
|
$
|
4.48
|
$
|
4.98
|
||||
|
Palladium / oz
|
|
$
|
429
|
|
$
|
429
|
|
$
|
445
|
|
$
|
445
|
$
|
459
|
$
|
445
|
$
|
408
|
$
|
399
|
||||
|
Cobalt / lb
|
|
$
|
12.78
|
|
$
|
12.78
|
|
$
|
12.77
|
|
$
|
12.80
|
|
$
|
12.98
|
|
$
|
13.85
|
|
$
|
13.85
|
|
$
|
13.72
|
|
Gain on disposal of PMPA
|
|
$
|
-
|
|
$
|
-
|
|
$
|
-
|
|
$
|
-
|
$
|
-
|
$
|
5,027
|
$
|
-
|
$
|
51,443
|
||||
|
Impairment (reversal)
|
|
$
|
-
|
|
$
|
-
|
|
$
|
-
|
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
1,719
|
||||
|
Net earnings
|
|
$
|
154,635
|
|
$
|
122,317
|
|
$
|
164,041
|
|
$
|
168,435
|
$
|
116,371
|
$
|
141,448
|
$
|
111,391
|
$
|
166,125
|
||||
|
Per share
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||
|
Basic
|
|
$
|
0.341
|
|
$
|
0.270
|
|
$
|
0.362
|
|
$
|
0.372
|
$
|
0.257
|
$
|
0.312
|
$
|
0.246
|
$
|
0.367
|
||||
|
Diluted
|
|
$
|
0.340
|
|
$
|
0.269
|
|
$
|
0.362
|
|
$
|
0.371
|
|
$
|
0.257
|
|
$
|
0.312
|
|
$
|
0.246
|
|
$
|
0.367
|
|
Adjusted net earnings 3
|
|
$
|
152,803
|
|
$
|
149,565
|
|
$
|
138,834
|
|
$
|
164,569
|
$
|
121,467
|
$
|
142,584
|
$
|
104,431
|
$
|
103,744
|
||||
|
Per share
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||
|
Basic
|
|
$
|
0.337
|
|
$
|
0.330
|
|
$
|
0.306
|
|
$
|
0.363
|
$
|
0.268
|
$
|
0.315
|
$
|
0.231
|
$
|
0.229
|
||||
|
Diluted
|
|
$
|
0.336
|
|
$
|
0.329
|
|
$
|
0.306
|
|
$
|
0.363
|
|
$
|
0.268
|
|
$
|
0.314
|
|
$
|
0.230
|
|
$
|
0.229
|
|
Cash flow from operations
|
|
$
|
254,337
|
|
$
|
234,393
|
|
$
|
219,380
|
|
$
|
242,226
|
$
|
171,103
|
$
|
202,376
|
$
|
135,104
|
$
|
172,028
|
||||
|
Per share 3
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||
|
Basic
|
|
$
|
0.561
|
|
$
|
0.517
|
|
$
|
0.484
|
|
$
|
0.535
|
$
|
0.378
|
$
|
0.447
|
$
|
0.299
|
$
|
0.381
|
||||
|
Diluted
|
|
$
|
0.560
|
|
$
|
0.516
|
|
$
|
0.484
|
|
$
|
0.534
|
|
$
|
0.377
|
|
$
|
0.446
|
|
$
|
0.298
|
|
$
|
0.380
|
|
Dividends declared
|
|
$
|
70,314
|
|
$
|
70,273
|
|
$
|
70,261
|
|
$
|
67,950
|
$
|
67,946
|
$
|
67,938
|
$
|
67,910
|
$
|
67,797
|
||||
|
Per share
|
|
$
|
0.155
|
|
$
|
0.155
|
|
$
|
0.155
|
|
$
|
0.150
|
|
$
|
0.150
|
|
$
|
0.150
|
|
$
|
0.150
|
|
$
|
0.150
|
|
Total assets
|
|
$
|
7,386,179
|
|
$
|
7,247,082
|
|
$
|
7,180,455
|
|
$
|
7,031,185
|
|
$
|
6,881,515
|
|
$
|
6,879,905
|
|
$
|
6,905,479
|
|
$
|
6,759,906
|
|
Total liabilities
|
|
$
|
126,165
|
|
$
|
87,410
|
|
$
|
101,260
|
|
$
|
45,669
|
|
$
|
38,254
|
|
$
|
33,492
|
|
$
|
93,025
|
|
$
|
42,231
|
|
Total shareholders' equity
|
|
$
|
7,260,014
|
|
$
|
7,159,672
|
|
$
|
7,079,195
|
|
$
|
6,985,516
|
|
$
|
6,843,261
|
|
$
|
6,846,413
|
|
$
|
6,812,454
|
|
$
|
6,717,675
|
| 1) |
All figures in thousands except gold and palladium ounces produced and sold, per unit amounts and per share amounts.
|
| 2) |
Expressed as dollars per ounce and for cobalt per pound.
|
| 3) |
Refer to discussion on non-IFRS beginning on page 40 of this MD&A.
|
| 4) |
Includes the non-cash per ounce cost of sale associated with delay ounces. Please see footnote 3 on page 8 of this MD&A for more information).
|
| 5) |
Cash cost per pound of cobalt sold during the fourth quarter of 2022 includes an inventory write-down of $1.6 million, resulting in an increase of $8.71 per pound. During the three months ended March 31, 2023, June
30, 2023, September 30, 2023 and December 31, 2023, the cobalt inventory sold was net of the inventory write-down taken in 2022 in the amount of $1.0 million, $0.5 million, $0.1 million and $0.02 million, respectively, resulting in a decrease
to the reported cost of cobalt sold of $3.18 per pound of cobalt sold, $1.81 per pound of cobalt sold, $0.51 per pound of cobalt sold and $0.08 per pound of cobalt sold, respectively.
|
|
Three Months Ended September 30, 2024
|
||||||||||||||||
|
|
Units
Produced²
|
Units
Sold |
Average
Realized Price ($'s Per Unit) |
Average
Cash Cost ($'s Per Unit) 3 |
Average
Depletion ($'s Per Unit) 4 |
Sales
|
Net
Earnings |
Cash Flow
From Operations |
Total
Assets |
|||||||
|
Gold
|
||||||||||||||||
|
Salobo
|
62,689
|
58,101
|
$
|
2,490
|
$
|
425
|
$
|
378
|
$
|
144,656
|
$
|
98,016
|
$
|
122,916
|
$
|
2,616,346
|
|
Sudbury 5
|
4,287
|
2,495
|
2,519
|
400
|
1,326
|
6,286
|
1,979
|
4,798
|
246,918
|
|||||||
|
Constancia
|
10,446
|
5,186
|
2,490
|
422
|
323
|
12,912
|
9,048
|
10,722
|
70,095
|
|||||||
|
San Dimas
|
6,882
|
7,022
|
2,490
|
637
|
290
|
17,482
|
10,975
|
13,010
|
138,507
|
|||||||
|
Stillwater
|
2,247
|
1,635
|
2,490
|
438
|
421
|
4,071
|
2,667
|
3,355
|
208,474
|
|||||||
|
Other 6
|
648
|
1,255
|
|
2,481
|
|
192
|
|
1,584
|
|
3,114
|
|
886
|
|
2,874
|
|
901,880
|
|
|
87,199
|
75,694
|
$
|
2,491
|
$
|
440
|
$
|
418
|
$
|
188,521
|
$
|
123,571
|
$
|
157,675
|
$
|
4,182,220
|
|
Silver
|
||||||||||||||||
|
Peñasquito
|
1,785
|
1,667
|
$
|
29.58
|
$
|
4.50
|
$
|
4.86
|
$
|
49,329
|
$
|
33,725
|
$
|
41,825
|
$
|
253,461
|
|
Antamina
|
925
|
989
|
29.58
|
6.06
|
8.46
|
29,257
|
14,893
|
23,260
|
498,029
|
|||||||
|
Constancia
|
648
|
366
|
29.58
|
6.23
|
6.10
|
10,822
|
6,310
|
8,543
|
170,242
|
|||||||
|
Other 7
|
1,196
|
853
|
|
30.17
|
|
4.34
|
|
4.83
|
|
25,741
|
|
17,912
|
|
22,594
|
|
645,485
|
|
|
4,554
|
3,875
|
$
|
29.71
|
$
|
5.03
|
$
|
5.89
|
$
|
115,149
|
$
|
72,840
|
$
|
96,222
|
$
|
1,567,217
|
|
Palladium
|
||||||||||||||||
|
Stillwater
|
4,034
|
3,761
|
$
|
969
|
$
|
173
|
$
|
429
|
$
|
3,644
|
$
|
1,380
|
$
|
2,994
|
$
|
215,082
|
|
Platreef
|
-
|
-
|
|
n.a.
|
|
n.a.
|
|
n.a.
|
|
-
|
|
-
|
|
-
|
|
78,820
|
|
|
4,034
|
3,761
|
$
|
969
|
$
|
173
|
$
|
429
|
$
|
3,644
|
$
|
1,380
|
$
|
2,994
|
$
|
293,902
|
|
Platinum
|
||||||||||||||||
|
Marathon
|
-
|
-
|
$
|
n.a.
|
$
|
n.a.
|
$
|
n.a.
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
9,451
|
|
Platreef
|
-
|
-
|
|
n.a.
|
|
n.a.
|
|
n.a.
|
|
-
|
|
-
|
|
-
|
|
57,588
|
|
|
-
|
-
|
$
|
n.a.
|
$
|
n.a.
|
$
|
n.a.
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
67,039
|
|
Cobalt
|
||||||||||||||||
|
Voisey's Bay
|
397
|
88
|
$
|
10.65
|
$
|
2.15
|
$
|
12.78
|
$
|
939
|
$
|
(378)
|
$
|
321
|
$
|
345,745
|
|
Operating results
|
|
|
|
|
|
|
|
$
|
308,253
|
$
|
197,413
|
$
|
257,212
|
$
|
6,456,123
|
|
|
Other
|
||||||||||||||||
|
General and administrative
|
$
|
(9,488)
|
$
|
(6,215)
|
||||||||||||
|
Share based compensation
|
(9,628)
|
-
|
||||||||||||||
|
Donations and community investments
|
(2,352)
|
(2,198)
|
||||||||||||||
|
Finance costs
|
(1,404)
|
(1,051)
|
||||||||||||||
|
Other
|
7,605
|
3,664
|
||||||||||||||
|
Income tax
|
|
|
|
|
|
|
|
|
|
|
|
(27,511)
|
|
2,925
|
|
|
|
Total other
|
|
|
|
|
|
|
|
|
$
|
(42,778)
|
$
|
(2,875)
|
$
|
930,056
|
||
|
|
|
|
|
|
|
|
|
|
|
|
$
|
154,635
|
$
|
254,337
|
$
|
7,386,179
|
| 1) |
Units of gold, silver and palladium produced and sold are reported in ounces, while cobalt is reported in pounds. All figures in thousands except gold and palladium ounces produced and sold and per unit amounts.
|
| 2) |
Quantity produced represents the amount of gold, silver, palladium and cobalt contained in concentrate or doré prior to smelting or refining deductions. Production figures are based on information provided by the
operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be updated in future periods as additional
information is received.
|
| 3) |
Refer to discussion on non-IFRS measure (iii) on page 42 of this MD&A.
|
| 4) |
Includes the non-cash per ounce cost of sale associated with delay ounces. Please see footnote 3 on page 8 of this MD&A for more information).
|
| 5) |
Comprised of the operating Coleman, Copper Cliff, Garson, Creighton and Totten gold interests and the non-operating Stobie and Victor gold interests.
|
| 6) |
Other gold interests comprised of the operating Marmato gold interest as well as the non-operating Minto, Copper World, Santo Domingo, Fenix, Blackwater, Curipamba, Marathon, Goose, Cangrejos, Platreef, Curraghinalt
and Kudz Ze Kayah gold interests. Other includes ounces sold that were received under the delay ounce provisions of each of the Santo Domingo and Curipamba PMPAs (see footnote 3 on page 8 of this MD&A for more information).
|
| 7) |
Other silver interests comprised of the operating Los Filos, Zinkgruvan, Neves-Corvo, Marmato and Cozamin silver interests as well as the non-operating Stratoni, Aljustrel, Minto, Pascua-Lama, Copper World, Navidad,
Blackwater, Curipamba, Mineral Park and Kudz Ze Kayah silver interests.
|
|
Three Months Ended September 30, 2023
|
||||||||||||||||
|
|
Units
Produced²
|
Units
Sold |
Average
Realized Price ($'s Per Unit) |
Average
Cash Cost ($'s Per Unit) 3 |
Average
Depletion ($'s Per Unit) |
Sales
|
Net
Earnings |
Cash Flow
From Operations |
Total
Assets |
|||||||
|
Gold
|
||||||||||||||||
|
Salobo
|
69,045
|
44,444
|
$
|
1,944
|
$
|
420
|
$
|
330
|
$
|
86,395
|
$
|
53,026
|
$
|
67,710
|
$
|
2,341,485
|
|
Sudbury 4
|
3,857
|
4,836
|
1,950
|
400
|
1,204
|
9,428
|
1,669
|
7,494
|
268,224
|
|||||||
|
Constancia
|
19,003
|
12,399
|
1,944
|
419
|
316
|
24,102
|
14,991
|
18,906
|
86,555
|
|||||||
|
San Dimas
|
9,995
|
9,695
|
1,944
|
631
|
260
|
18,846
|
10,216
|
12,732
|
147,638
|
|||||||
|
Stillwater
|
2,454
|
1,985
|
1,944
|
349
|
510
|
3,859
|
2,154
|
3,167
|
212,650
|
|||||||
|
Other 5
|
673
|
1,067
|
|
1,945
|
|
368
|
|
391
|
|
2,077
|
|
1,266
|
|
1,684
|
|
557,035
|
|
|
105,027
|
74,426
|
$
|
1,944
|
$
|
444
|
$
|
381
|
$
|
144,707
|
$
|
83,322
|
$
|
111,693
|
$
|
3,613,587
|
|
Silver
|
||||||||||||||||
|
Peñasquito
|
-
|
453
|
$
|
23.82
|
$
|
4.43
|
$
|
4.06
|
$
|
10,804
|
$
|
6,952
|
$
|
8,795
|
$
|
278,028
|
|
Antamina
|
894
|
794
|
23.82
|
4.81
|
7.06
|
18,915
|
9,496
|
15,097
|
527,227
|
|||||||
|
Constancia
|
697
|
435
|
23.82
|
6.18
|
6.24
|
10,360
|
4,958
|
7,674
|
183,736
|
|||||||
|
Other 6
|
1,806
|
1,283
|
|
23.62
|
|
5.15
|
|
2.64
|
|
30,293
|
|
20,301
|
|
19,439
|
|
549,641
|
|
|
3,397
|
2,965
|
$
|
23.73
|
$
|
5.10
|
$
|
4.57
|
$
|
70,372
|
$
|
41,707
|
$
|
51,005
|
$
|
1,538,632
|
|
Palladium
|
||||||||||||||||
|
Stillwater
|
4,006
|
4,242
|
$
|
1,251
|
$
|
223
|
$
|
459
|
$
|
5,307
|
$
|
2,416
|
$
|
4,361
|
$
|
222,154
|
|
Platinum
|
||||||||||||||||
|
Marathon
|
-
|
-
|
$
|
n.a.
|
$
|
n.a.
|
$
|
n.a.
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
9,450
|
|
Cobalt
|
||||||||||||||||
|
Voisey's Bay
|
183
|
198
|
$
|
13.87
|
$
|
3.66 ⁷
|
$
|
12.98
|
$
|
2,751
|
$
|
(551)
|
$
|
4,235
|
$
|
353,631
|
|
Operating results
|
|
|
|
|
|
|
|
$
|
223,137
|
$
|
126,894
|
$
|
171,294
|
$
|
5,737,454
|
|
|
Other
|
||||||||||||||||
|
General and administrative
|
$
|
(8,606)
|
$
|
(6,321)
|
||||||||||||
|
Share based compensation
|
(4,336)
|
-
|
||||||||||||||
|
Donations and community investments
|
(1,736)
|
(1,750)
|
||||||||||||||
|
Finance costs
|
(1,407)
|
(1,078)
|
||||||||||||||
|
Other
|
10,707
|
9,870
|
||||||||||||||
|
Income tax
|
|
|
|
|
|
|
|
|
|
|
|
(5,145)
|
|
(912)
|
|
|
|
Total other
|
|
|
|
|
|
|
|
|
$
|
(10,523)
|
$
|
(191)
|
$
|
1,144,061
|
||
|
|
|
|
|
|
|
|
|
|
|
|
$
|
116,371
|
$
|
171,103
|
$
|
6,881,515
|
| 1) |
Units of gold, silver and palladium produced and sold are reported in ounces, while cobalt is reported in pounds. All figures in thousands except gold and palladium ounces produced and sold and per unit amounts.
|
| 2) |
Quantity produced represent the amount of gold, silver, palladium and cobalt contained in concentrate or doré prior to smelting or refining deductions. Production figures are based on information provided by the
operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be updated in future periods as additional
information is received.
|
| 3) |
Refer to discussion on non-IFRS measure (iii) on page 42 of this MD&A.
|
| 4) |
Comprised of the operating Coleman, Copper Cliff, Garson, Creighton and Totten gold interests as well as the non-operating Stobie and Victor gold interests.
|
| 5) |
Other gold interests are comprised of the operating Marmato gold interests as well as the non-operating Minto, 777, Copper World, Santo Domingo, Fenix, Blackwater, Marathon, Curipamba, Goose and Cangrejos gold
interests. On June 22, 2022, Hudbay announced that mining activities at 777 have concluded and closure activities have commenced. On May 13, 2023, Minto announced the suspension of operations at the Minto mine.
|
| 6) |
Other silver interests comprised of the operating Los Filos, Zinkgruvan, Neves-Corvo, Aljustrel, Cozamin and Marmato silver interests, the non-operating Minto, 777, Loma de La Plata, Stratoni, Pascua-Lama, Copper
World, Blackwater and Curipamba silver interests. On June 22, 2022, Hudbay announced that mining activities at 777 have concluded and closure activities have commenced. On May 13, 2023, Minto announced the suspension of operations at the Minto
mine. On September 12, 2023, it was announced that the production of zinc and lead concentrates at Aljustrel will be halted from September 24, 2023 until the second quarter of 2025.
|
| 7) |
Cash cost per pound of cobalt sold during the third quarter of 2023 was net of a previously recorded inventory write-down of $0.1 million, resulting in a decrease of $0.51 per pound of cobalt sold.
|
|
|
|
|
Q3 2024
|
|
|
Q3 2023
|
|
|
Change
|
|
Change
|
|
GEO Production 1, 2
|
|
|
144,164
|
|
|
147,278
|
|
|
(3,114)
|
|
(2.1)%
|
|
GEO Sales 2
|
|
|
122,715
|
|
111,935
|
10,780
|
9.6 %
|
||||
|
Average price per GEO sold 2
|
|
$
|
2,512
|
|
$
|
1,993
|
|
$
|
519
|
|
26.0 %
|
|
Revenue
|
|
$
|
308,253
|
|
$
|
223,137
|
|
$
|
85,116
|
|
38.1 %
|
|
Cost of sales, excluding depletion
|
|
$
|
55,310
|
|
$
|
49,808
|
$
|
(5,502)
|
(11.0)%
|
||
|
Depletion
|
|
|
55,530
|
|
|
46,435
|
|
|
(9,095)
|
|
(19.6)%
|
|
Cost of Sales
|
|
$
|
110,840
|
|
$
|
96,243
|
|
$
|
(14,597)
|
|
(15.2)%
|
|
Gross Margin
|
|
$
|
197,413
|
|
$
|
126,894
|
$
|
70,519
|
55.6 %
|
||
|
General and administrative expenses
|
|
|
9,488
|
|
8,606
|
(882)
|
(10.2)%
|
||||
|
Share based compensation
|
|
|
9,628
|
|
4,336
|
(5,292)
|
(122.0)%
|
||||
|
Donations and community investments
|
|
|
2,352
|
|
|
1,736
|
|
|
(616)
|
|
(35.5)%
|
|
Earnings from Operations
|
|
$
|
175,945
|
|
$
|
112,216
|
$
|
63,729
|
56.8 %
|
||
|
Other income (expense)
|
|
|
7,605
|
|
|
10,707
|
|
|
(3,102)
|
|
(29.0)%
|
|
Earnings before finance costs and income taxes
|
|
$
|
183,550
|
|
$
|
122,923
|
$
|
60,627
|
49.3 %
|
||
|
Finance costs
|
|
|
1,404
|
|
|
1,407
|
|
|
3
|
|
0.2 %
|
|
Earnings before income taxes
|
|
$
|
182,146
|
|
$
|
121,516
|
$
|
60,630
|
49.9 %
|
||
|
Income tax expense
|
|
|
27,511
|
|
|
5,145
|
|
|
(22,366)
|
|
(434.7)%
|
|
Net earnings
|
|
$
|
154,635
|
|
$
|
116,371
|
|
$
|
38,264
|
|
32.9 %
|
| 1) |
Quantity produced represents the amount of gold, silver, palladium and cobalt contained in concentrate or doré prior to smelting or refining deductions. Production figures are based on information provided by the
operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be updated in future periods as additional
information is received.
|
| 2) |
GEOs, which are provided to assist the reader, are based on the following commodity price assumptions: $2,000 per ounce gold; $23.00 per ounce silver; $1,000 per ounce palladium; and $13.00 per pound cobalt;
consistent with those used in estimating the Company's production guidance for 2024.
|
| • |
9,100 ounce or 34% decrease from Constancia (comprised of 8,600 gold ounces and 49,000 silver ounces), primarily due to lower grades largely due to the planned stripping activity in the Pampacancha pit, which
commenced in the second quarter, and continued throughout the third quarter;
|
| • |
7,000 ounce or 33% decrease from the Other mines (comprised of 611,000 silver ounces), primarily due to the temporary suspension of attributable production from Aljustrel;
|
| • |
6,400 ounce or 9% decrease from Salobo; primarily due to lower grades, partially offset by higher throughput. From a throughput perspective, the three 12 mtpa lines operated at approximately 90% of capacity during
Q3-2024, as compared to approximately 73% during Q3-2023; and
|
| • |
3,100 ounce or 31% decrease from San Dimas, primarily due to lower throughput and grades; partially offset by
|
| • |
20,500 ounce increase from Peñasquito (1,785,000 silver ounces), with Peñasquito producing no ounces in the third quarter of 2023 as a result of a labour strike which lasted from June 7 to October 13, 2023; and
|
| • |
1,400 ounce or 118% increase from Voisey's Bay (214,000 cobalt pounds), primarily attributable to the mining of higher grade material as the transitional period between the depletion of the Ovoid open-pit and ramp-up to full production
of the Voisey’s Bay underground mine nears completion.
|
|
Net earnings for the three months ended September 30, 2023
|
|
|
$
|
116,371
|
|
Variance in gross margin
|
||||
|
Variance in revenue due to:
|
||||
|
Payable gold production
|
$
|
(33,603)
|
||
|
Payable silver production
|
27,557
|
|||
|
Payable palladium production
|
252
|
|||
|
Payable cobalt production
|
|
2,777
|
|
|
|
Total payable production
|
$
|
(3,017)
|
||
|
Changes in inventory and PBND
|
23,586
|
|||
|
Changes in delay ounces received 1
|
1,746
|
|||
|
Prices realized per ounce sold
|
|
|
|
62,801
|
|
Total increase to revenue
|
|
|
$
|
85,116
|
|
Variance in cost of sales due to:
|
||||
|
GEO payable production volume
|
$
|
(1,755)
|
||
|
GEO payable production mix differences
|
981
|
|||
|
Changes in inventory and PBND
|
(3,792)
|
|||
|
Changes in delay ounces 1
|
(1,698)
|
|||
|
Cash cost per ounce
|
(1,707)
|
|||
|
Depletion per ounce
|
|
|
|
(6,626)
|
|
Total increase to cost of sales
|
|
|
$
|
(14,597)
|
|
Total increase to gross margin
|
|
|
$
|
70,519
|
|
Other variances
|
||||
|
General and administrative expenses (see page 26)
|
(882)
|
|||
|
Share based compensation (see page 27)
|
(5,292)
|
|||
|
Donations and community investment (see page 27)
|
(616)
|
|||
|
Other income / expense (see page 27)
|
(3,102)
|
|||
|
Finance costs (see page 28)
|
3
|
|||
|
Income taxes (see page 28)
|
|
|
|
(22,366)
|
|
Total increase in net earnings
|
$
|
38,264
|
||
|
Net earnings for the three months ended September 30, 2024
|
|
|
$
|
154,635
|
| 1) |
The cost of sales related to delay ounces is a non-cash expense (see footnote 3 on page 8 of this MD&A for more information).
|
|
Nine Months Ended September 30, 2024
|
||||||||||||||||
|
|
Units
Produced²
|
Units
Sold |
Average
Realized Price ($'s Per Unit) |
Average
Cash Cost ($'s Per Unit) 3 |
Average
Depletion ($'s Per Unit) 4 |
Sales
|
Net
Earnings |
Cash Flow
From Operations |
Total
Assets |
|||||||
|
Gold
|
||||||||||||||||
|
Salobo
|
187,536
|
169,904
|
$
|
2,307
|
$
|
425
|
$
|
383
|
$
|
391,973
|
$
|
254,758
|
$
|
322,761
|
$
|
2,616,346
|
|
Sudbury 5
|
14,382
|
12,303
|
2,286
|
400
|
1,265
|
28,130
|
7,642
|
22,718
|
246,918
|
|||||||
|
Constancia
|
30,429
|
31,949
|
2,200
|
421
|
318
|
70,275
|
46,663
|
56,833
|
70,095
|
|||||||
|
San Dimas
|
21,513
|
21,756
|
2,296
|
634
|
286
|
49,950
|
29,941
|
36,156
|
138,507
|
|||||||
|
Stillwater
|
6,983
|
6,618
|
2,288
|
405
|
453
|
15,144
|
9,469
|
12,464
|
208,474
|
|||||||
|
Other 6
|
1,855
|
2,509
|
|
2,347
|
|
293
|
|
1,056
|
|
5,888
|
|
2,504
|
|
5,153
|
|
901,880
|
|
|
262,698
|
245,039
|
$
|
2,291
|
$
|
440
|
$
|
419
|
$
|
561,360
|
$
|
350,977
|
$
|
456,085
|
$
|
4,182,220
|
|
Silver
|
||||||||||||||||
|
Peñasquito
|
6,691
|
4,988
|
$
|
27.18
|
$
|
4.50
|
$
|
4.57
|
$
|
135,578
|
$
|
90,361
|
$
|
113,132
|
$
|
253,461
|
|
Antamina
|
2,723
|
2,668
|
27.63
|
5.56
|
8.06
|
73,710
|
37,377
|
58,878
|
498,029
|
|||||||
|
Constancia
|
1,739
|
1,514
|
26.55
|
6.21
|
6.17
|
40,180
|
21,444
|
30,785
|
170,242
|
|||||||
|
Other 7
|
3,930
|
2,595
|
|
28.37
|
|
4.29
|
|
4.51
|
|
73,630
|
|
50,785
|
|
60,026
|
|
645,485
|
|
|
15,083
|
11,765
|
$
|
27.46
|
$
|
4.91
|
$
|
5.55
|
$
|
323,098
|
$
|
199,967
|
$
|
262,821
|
$
|
1,567,217
|
|
Palladium
|
||||||||||||||||
|
Stillwater
|
12,835
|
12,836
|
$
|
976
|
$
|
177
|
$
|
435
|
$
|
12,531
|
$
|
4,674
|
$
|
10,259
|
$
|
215,082
|
|
Platreef
|
-
|
-
|
|
n.a.
|
|
n.a.
|
|
n.a.
|
|
-
|
|
-
|
|
-
|
|
78,820
|
|
|
12,835
|
12,836
|
$
|
976
|
$
|
177
|
$
|
435
|
$
|
12,531
|
$
|
4,674
|
$
|
10,259
|
$
|
293,902
|
|
Platinum
|
||||||||||||||||
|
Marathon
|
-
|
-
|
$
|
n.a.
|
$
|
n.a.
|
$
|
n.a.
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
9,451
|
|
Platreef
|
-
|
-
|
|
n.a.
|
|
n.a.
|
|
n.a.
|
|
-
|
|
-
|
|
-
|
|
57,588
|
|
|
-
|
-
|
$
|
n.a.
|
$
|
n.a.
|
$
|
n.a.
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
67,039
|
|
Cobalt
|
||||||||||||||||
|
Voisey's Bay
|
896
|
485
|
$
|
14.71
|
$
|
2.84
|
$
|
12.77
|
$
|
7,134
|
$
|
(438)
|
$
|
9,407
|
$
|
345,745
|
|
Operating results
|
|
|
|
|
|
|
|
$
|
904,123
|
$
|
555,180
|
$
|
738,572
|
$
|
6,456,123
|
|
|
Other
|
||||||||||||||||
|
General and administrative
|
$
|
(30,193)
|
$
|
(31,134)
|
||||||||||||
|
Share based compensation
|
(17,150)
|
(11,129)
|
||||||||||||||
|
Donations and community investments
|
(4,626)
|
(4,185)
|
||||||||||||||
|
Finance costs
|
(4,144)
|
(3,234)
|
||||||||||||||
|
Other
|
19,922
|
16,486
|
||||||||||||||
|
Income tax
|
|
|
|
|
|
|
|
|
|
|
|
(77,996)
|
|
2,734
|
|
|
|
Total other
|
|
|
|
|
|
|
|
|
$
|
(114,187)
|
$
|
(30,462)
|
$
|
930,056
|
||
|
|
|
|
|
|
|
|
|
|
|
|
$
|
440,993
|
$
|
708,110
|
$
|
7,386,179
|
| 1) |
Units of gold, silver and palladium produced and sold are reported in ounces, while cobalt is reported in pounds. All figures in thousands except gold and palladium ounces produced and sold and per unit amounts.
|
| 2) |
Quantity produced represents the amount of gold, silver, palladium and cobalt contained in concentrate or doré prior to smelting or refining deductions. Production figures are based on information provided by the
operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be updated in future periods as additional
information is received.
|
| 3) |
Refer to discussion on non-IFRS measure (iii) on page 42 of this MD&A.
|
| 4) |
Includes the non-cash per ounce cost of sale associated with delay ounces. Please see footnote 3 on page 8 of this MD&A for more information).
|
| 5) |
Comprised of the operating Coleman, Copper Cliff, Garson, Creighton and Totten gold interests and the non-operating Stobie and Victor gold interests.
|
| 6) |
Other gold interests comprised of the operating Marmato gold interest as well as the non-operating Minto, Copper World, Santo Domingo, Fenix, Blackwater, Curipamba, Marathon, Goose, Cangrejos, Platreef, Curraghinalt
and Kudz Ze Kayah gold interests. Other includes ounces sold that were received under the delay ounce provisions of each of the Santo Domingo and Curipamba PMPAs (see footnote 3 on page 8 of this MD&A for more information).
|
| 7) |
Other silver interests comprised of the operating Los Filos, Zinkgruvan, Neves-Corvo, Marmato and Cozamin silver interests as well as the non-operating Stratoni, Aljustrel, Minto, Pascua-Lama, Copper World, Navidad,
Blackwater, Curipamba, Mineral Park and Kudz Ze Kayah silver interests.
|
|
Nine Months Ended September 30, 2023
|
||||||||||||||||||
|
|
Units
Produced²
|
Units
Sold |
Average
Realized Price ($'s Per Unit) |
Average
Cash Cost ($'s Per Unit) 3 |
Average
Depletion ($'s Per Unit) |
Sales
|
Gain on Disposal 4
|
Net
Earnings |
Cash Flow
From Operations |
Total
Assets |
||||||||
|
Gold
|
||||||||||||||||||
|
Salobo
|
167,526
|
126,440
|
$
|
1,947
|
$
|
420
|
$
|
330
|
$
|
246,219
|
$
|
-
|
$
|
151,287
|
$
|
193,063
|
$
|
2,341,485
|
|
Sudbury 5
|
15,878
|
13,979
|
1,953
|
400
|
1,087
|
27,295
|
-
|
6,512
|
21,420
|
268,224
|
||||||||
|
Constancia
|
33,352
|
28,597
|
1,948
|
417
|
316
|
55,718
|
-
|
34,751
|
43,779
|
86,555
|
||||||||
|
San Dimas
|
31,915
|
31,700
|
1,945
|
628
|
260
|
61,657
|
-
|
33,535
|
41,762
|
147,638
|
||||||||
|
Stillwater
|
6,431
|
6,274
|
1,945
|
347
|
510
|
12,201
|
-
|
6,824
|
10,026
|
212,650
|
||||||||
|
Other 6
|
6,124
|
5,335
|
1,935
|
1,119
|
172
|
10,324
|
-
|
3,439
|
4,090
|
557,035
|
||||||||
|
|
261,226
|
212,325
|
$
|
1,947
|
$
|
465
|
$
|
369
|
$
|
413,414
|
$
|
-
|
$
|
236,348
|
$
|
314,140
|
$
|
3,613,587
|
|
Silver
|
||||||||||||||||||
|
Peñasquito
|
3,820
|
3,849
|
$
|
23.63
|
$
|
4.43
|
$
|
4.06
|
$
|
90,967
|
$
|
-
|
$
|
58,268
|
$
|
73,915
|
$
|
278,028
|
|
Antamina
|
2,750
|
2,571
|
23.65
|
4.69
|
7.06
|
60,812
|
-
|
30,625
|
48,765
|
527,227
|
||||||||
|
Constancia
|
1,669
|
1,475
|
23.75
|
6.15
|
6.24
|
35,034
|
-
|
16,750
|
25,962
|
183,736
|
||||||||
|
Other 7
|
4,746
|
3,256
|
23.44
|
5.58
|
2.82
|
76,316
|
5,027
|
53,966
|
55,364
|
549,641
|
||||||||
|
|
12,985
|
11,151
|
$
|
23.60
|
$
|
5.05
|
$
|
4.68
|
$
|
263,129
|
$
|
5,027
|
$
|
159,609
|
$
|
204,006
|
$
|
1,538,632
|
|
Palladium
|
||||||||||||||||||
|
Stillwater
|
11,591
|
10,580
|
$
|
1,410
|
$
|
255
|
$
|
440
|
$
|
14,922
|
$
|
-
|
$
|
7,565
|
$
|
12,223
|
$
|
222,154
|
|
Platinum
|
||||||||||||||||||
|
Marathon
|
-
|
-
|
$
|
n.a.
|
$
|
n.a.
|
$
|
n.a.
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
9,450
|
|
Cobalt
|
||||||||||||||||||
|
Voisey's Bay
|
458
|
786
|
$
|
14.13
|
$
|
3.36 ⁸
|
$
|
13.63
|
$
|
11,108
|
$
|
-
|
$
|
(2,243)
|
$
|
13,056
|
$
|
353,631
|
|
Operating results
|
|
|
|
|
|
|
|
$
|
702,573
|
$
|
5,027
|
$
|
401,279
|
$
|
543,425
|
$
|
5,737,454
|
|
|
Other
|
||||||||||||||||||
|
General and administrative
|
$
|
(28,922)
|
$
|
(29,702)
|
||||||||||||||
|
Share based compensation
|
(16,217)
|
(16,675)
|
||||||||||||||||
|
Donations and community investments
|
(5,054)
|
(4,896)
|
||||||||||||||||
|
Finance costs
|
(4,138)
|
(3,147)
|
||||||||||||||||
|
Other
|
26,961
|
24,823
|
||||||||||||||||
|
Income tax
|
(4,700)
|
(5,244)
|
||||||||||||||||
|
Total other
|
|
|
|
|
|
|
|
|
|
|
$
|
(32,070)
|
$
|
(34,841)
|
$
|
1,144,061
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$
|
369,209
|
$
|
508,584
|
$
|
6,881,515
|
| 1) |
Units of gold, silver and palladium produced and sold are reported in ounces, while cobalt is reported in pounds. All figures in thousands except gold and palladium ounces produced and sold and per unit amounts.
|
| 2) |
Quantity produced represents the amount of gold, silver, palladium and cobalt contained in concentrate or doré prior to smelting or refining deductions. Production figures are based on information provided by the
operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be updated in future periods as additional
information is received.
|
| 3) |
Refer to discussion on non-IFRS measure (iii) on page 42 of this MD&A.
|
| 4) |
Refer to page 26 of this MD&A for more information.
|
| 5) |
Comprised of the operating Coleman, Copper Cliff, Garson, Creighton and Totten gold interests as well as the non-operating Stobie and Victor gold interests.
|
| 6) |
Other gold interests are comprised of the operating Marmato gold interests as well as the non-operating Minto, 777, Copper World, Santo Domingo, Fenix, Blackwater, Marathon, Curipamba, Goose and Cangrejos gold
interests. On June 22, 2022, Hudbay announced that mining activities at 777 have concluded and closure activities have commenced. On May 13, 2023, Minto announced the suspension of operations at the Minto mine.
|
| 7) |
Other silver interests comprised of the operating Los Filos, Zinkgruvan, Neves-Corvo, Aljustrel, Cozamin and Marmato silver interests and the non-operating Minto, 777, Loma de La Plata, Stratoni, Pascua-Lama, Copper
World, Blackwater and Curipamba silver interests. On June 22, 2022, Hudbay announced that mining activities at 777 have concluded and closure activities have commenced. On May 13, 2023, Minto announced the suspension of operations at the Minto
mine. On September 12, 2023, it was announced that the production of zinc and lead concentrates at Aljustrel will be halted from September 24, 2023 until the second quarter of 2025.
|
| 8) |
Cash cost per pound of cobalt sold during the nine months ended September 30, 2023 was net of a previously recorded inventory write-down of $1.6 million, resulting in a decrease of $2.05 per pound of cobalt sold.
|
|
|
|
|
YTD 2024
|
|
|
YTD 2023
|
|
|
Change
|
|
Change
|
|
GEO Production 1, 2
|
|
|
448,388
|
|
|
419,330
|
|
|
29,058
|
|
6.9 %
|
|
GEO Sales 2
|
|
|
389,907
|
|
350,961
|
38,946
|
11.1 %
|
||||
|
Average price per GEO sold 2
|
|
$
|
2,319
|
|
$
|
2,002
|
|
$
|
317
|
|
15.8 %
|
|
Revenue
|
|
$
|
904,123
|
|
$
|
702,573
|
|
$
|
201,550
|
|
28.7 %
|
|
Cost of sales, excluding depletion
|
|
$
|
170,872
|
|
$
|
160,413
|
$
|
(10,459)
|
(6.5)%
|
||
|
Depletion
|
|
|
178,071
|
|
|
145,908
|
|
|
(32,163)
|
|
(22.0)%
|
|
Cost of Sales
|
|
$
|
348,943
|
|
$
|
306,321
|
|
$
|
(42,622)
|
|
(13.9)%
|
|
Gross Margin
|
|
$
|
555,180
|
|
$
|
396,252
|
$
|
158,928
|
40.1 %
|
||
|
General and administrative expenses
|
|
|
30,193
|
|
28,922
|
(1,271)
|
(4.4)%
|
||||
|
Share based compensation
|
|
|
17,150
|
|
16,217
|
(933)
|
(5.8)%
|
||||
|
Donations and community investments
|
|
|
4,626
|
|
|
5,054
|
|
|
428
|
|
8.5 %
|
|
Earnings from Operations
|
|
$
|
503,211
|
|
$
|
346,059
|
$
|
157,152
|
45.4 %
|
||
|
Gain on disposal of mineral stream interests
|
|
|
-
|
|
5,027
|
(5,027)
|
(100.0)%
|
||||
|
Other income (expense)
|
|
|
19,922
|
|
|
26,961
|
|
|
(7,039)
|
|
(26.1)%
|
|
Earnings before finance costs and income taxes
|
|
$
|
523,133
|
|
$
|
378,047
|
$
|
145,086
|
38.4 %
|
||
|
Finance costs
|
|
|
4,144
|
|
|
4,138
|
|
|
(6)
|
|
(0.1)%
|
|
Earnings before income taxes
|
|
$
|
518,989
|
|
$
|
373,909
|
$
|
145,080
|
38.8 %
|
||
|
Income tax expense
|
|
|
77,996
|
|
|
4,700
|
|
|
(73,296)
|
|
(1,559.5)%
|
|
Net earnings
|
|
$
|
440,993
|
|
$
|
369,209
|
|
$
|
71,784
|
|
19.4 %
|
| 1) |
Quantity produced represents the amount of gold, silver, palladium and cobalt contained in concentrate or doré prior to smelting or refining deductions. Production figures are based on information provided by the
operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be updated in future periods as additional
information is received.
|
| 2) |
GEOs, which are provided to assist the reader, are based on the following commodity price assumptions: $2,000 per ounce gold; $23.00 per ounce silver; $1,000 per ounce palladium; and $13.00 per pound cobalt;
consistent with those used in estimating the Company's production guidance for 2024.
|
| • |
33,000 ounce or 75% increase from Peñasquito (2,872,000 silver ounces), primarily due to higher grades and throughput, with prior year operations being impacted by a labour strike which lasted from June 7 to October
13, 2023;
|
| • |
20,000 ounce or 12% increase from Salobo, with production from the third concentrator line commencing at the end of 2022 and achieving the initial completion test of 32 Mtpa in Q4 2023, partially offset by lower
grades. From a throughput perspective, the three 12 mtpa lines operated at approximately 82% of capacity during 2024 as compared to approximately 65% during 2023; and
|
| • |
2,800 ounce or 95% increase from Voisey's Bay (438,000 cobalt pounds), primarily attributable to the mining of higher grade material as the transitional period between the depletion of the Ovoid open-pit and ramp-up to full production of
the Voisey’s Bay underground mine nears completion; partially offset by
|
| • |
13,700 ounce or 22% decrease from the Other mines (comprised of 4,300 gold ounces and 816,000 silver ounces), primarily due to the closure of the Minto mine in May 2023 and the temporary suspension of attributable
production from Aljustrel;
|
| • |
10,400 ounce or 33% decrease from San Dimas, primarily due to lower throughput and grades; and
|
| • |
2,100 ounce or 4% decrease from Constancia (comprised of 2,900 gold ounces and 70,000 silver ounces), primarily due to a lower grades largely due to the planned stripping activity in the Pampacancha pit, which commenced in the second
quarter, and continued throughout the third quarter.
|
|
Net earnings for the nine months ended September 30, 2023
|
|
|
$
|
369,209
|
|
Variance in gross margin
|
||||
|
Variance in revenue due to:
|
||||
|
Payable gold production
|
$
|
1,342
|
||
|
Payable silver production
|
48,427
|
|||
|
Payable palladium production
|
1,787
|
|||
|
Payable cobalt production
|
|
5,773
|
|
|
|
Total payable production
|
$
|
57,329
|
||
|
Changes in inventory and PBND
|
|
|
|
18,409
|
|
Changes in delay ounces received 1
|
|
|
|
1,746
|
|
Prices realized per ounce sold
|
|
|
|
124,066
|
|
Total increase to revenue
|
|
|
$
|
201,550
|
|
Variance in cost of sales due to:
|
|
|
|
|
|
GEO payable production volume
|
|
|
$
|
(28,720)
|
|
GEO payable production mix differences
|
|
|
|
10,493
|
|
Changes in inventory and PBND
|
|
|
|
(1,510)
|
|
Changes in delay ounces 1
|
|
|
|
(1,698)
|
|
Cash cost per ounce
|
|
|
|
(3,308)
|
|
Depletion per ounce
|
|
|
|
(17,879)
|
|
Total increase to cost of sales
|
|
|
$
|
(42,622)
|
|
Total increase to gross margin
|
|
|
$
|
158,928
|
|
Other variances
|
||||
|
Gain on disposal of mineral stream interest (see page 26)
|
(5,027)
|
|||
|
General and administrative expenses (see page 26)
|
(1,271)
|
|||
|
Donations and community investment (see page 27)
|
428
|
|||
|
Share based compensation (see page 27)
|
(933)
|
|||
|
Other income / expense (see page 27)
|
(7,039)
|
|||
|
Finance costs (see page 28)
|
(6)
|
|||
|
Income taxes (see page 28)
|
|
|
|
(73,296)
|
|
Total increase in net earnings
|
$
|
71,784
|
||
|
Net earnings for the nine months ended September 30, 2024
|
|
|
$
|
440,993
|
| 1) |
The cost of sales related to delay ounces is a non-cash expense (see footnote 3 on page 8 of this MD&A for more information).
|
|
(in thousands)
|
|
|
|
Proceeds received on 33% buyback of Goose
|
$
|
46,400
|
|
Less: 33% carrying value
|
|
(41,373)
|
|
Gain on partial disposal of the Goose PMPA
|
$
|
5,027
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
|||
|
(in thousands)
|
2024
|
2023
|
2024
|
2023
|
|
Corporate
|
|
|
||
|
Salaries and benefits
|
$ 3,722
|
$ 3,443
|
$ 11,420
|
$ 10,897
|
|
Depreciation
|
239
|
224
|
684
|
780
|
|
Professional fees
|
292
|
430
|
1,326
|
1,853
|
|
Business travel
|
424
|
257
|
1,292
|
909
|
|
Director fees
|
269
|
238
|
810
|
820
|
|
Business taxes
|
94
|
36
|
695
|
749
|
|
Audit and regulatory
|
688
|
502
|
2,437
|
2,671
|
|
Insurance
|
486
|
493
|
1,338
|
1,550
|
|
Other
|
1,237
|
1,075
|
3,444
|
3,091
|
|
General and administrative - corporate
|
$ 7,451
|
$ 6,698
|
$ 23,446
|
$ 23,320
|
|
Subsidiaries
|
|
|
||
|
Salaries and benefits
|
$ 1,280
|
$ 1,148
|
$ 4,030
|
$ 3,465
|
|
Depreciation
|
119
|
125
|
356
|
343
|
|
Professional fees
|
37
|
131
|
702
|
391
|
|
Business travel
|
75
|
76
|
298
|
223
|
|
Director fees
|
52
|
52
|
166
|
155
|
|
Business taxes
|
68
|
67
|
195
|
206
|
|
Insurance
|
13
|
12
|
44
|
39
|
|
Other
|
393
|
297
|
956
|
780
|
|
General and administrative - subsidiaries
|
$ 2,037
|
$ 1,908
|
$ 6,747
|
$ 5,602
|
|
Consolidated general and administrative
|
$ 9,488
|
$ 8,606
|
$ 30,193
|
$ 28,922
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
|||
|
(in thousands)
|
2024
|
2023
|
2024
|
2023
|
|
Equity settled share based compensation 1
|
|
|
||
|
Stock options
|
$ 733
|
$ 735
|
$ 2,104
|
$ 2,090
|
|
Restricted share units
|
992
|
997
|
2,874
|
3,043
|
|
Cash settled share based compensation
|
|
|
||
|
PSUs
|
7,903
|
2,604
|
12,172
|
11,084
|
|
Total share based compensation
|
$ 9,628
|
$ 4,336
|
$ 17,150
|
$ 16,217
|
| 1) |
Equity settled share based compensation is a non-cash expense.
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
|||
|
(in thousands)
|
2024
|
2023
|
2024
|
2023
|
|
Local donations and community investments 1
|
$ 853
|
$ 995
|
$ 1,950
|
$ 1,938
|
|
Partner donations and community investments 2
|
1,499
|
741
|
2,676
|
3,116
|
|
Total donations and community investments
|
$ 2,352
|
$ 1,736
|
$ 4,626
|
$ 5,054
|
| 1) |
The Local Community Investment Program supports organizations in Vancouver and the Cayman Islands, where Wheaton’s offices are located.
|
| 2) |
The Partner Community Investment Program supports the communities influenced by Mining Partners' operations.
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
|||
|
(in thousands)
|
2024
|
2023
|
2024
|
2023
|
|
Interest income
|
$ 6,767
|
$ 9,837
|
$ 16,901
|
$ 24,948
|
|
Dividend income
|
482
|
700
|
1,663
|
1,616
|
|
Foreign exchange gain (loss)
|
(178)
|
313
|
444
|
386
|
|
Gain (loss) on fair value adjustment of share purchase warrants held
|
523
|
(143)
|
903
|
(248)
|
|
Other
|
11
|
-
|
11
|
259
|
|
Total other income (expense)
|
$ 7,605
|
$ 10,707
|
$ 19,922
|
$ 26,961
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
|||
|
(in thousands)
|
2024
|
2023
|
2024
|
2023
|
|
Costs related to undrawn credit facilities
|
$ 1,333
|
$ 1,286
|
$ 4,010
|
$ 3,876
|
|
Interest expense - lease liabilities
|
71
|
78
|
216
|
131
|
|
Letter of guarantee
|
-
|
43
|
(82)
|
131
|
|
Total finance costs
|
$ 1,404
|
$ 1,407
|
$ 4,144
|
$ 4,138
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
|||
|
(in thousands)
|
2024
|
2023
|
2024
|
2023
|
|
Current income tax expense (recovery)
|
$ 780
|
$ 31
|
$ (2,029)
|
$ (2,529)
|
|
Global minimum income tax expense
|
27,851
|
-
|
78,361
|
-
|
|
Total current income tax expense (recovery)
|
$ 28,631
|
$ 31
|
$ 76,332
|
$ (2,529)
|
|
Deferred income tax expense (recovery) related to:
|
|
|
||
|
Origination and reversal of temporary differences
|
$ (595)
|
$ 423
|
$ 3,900
|
$ 3,484
|
|
Write down (reversal of write down) or recognition of prior period temporary differences
|
(525)
|
4,691
|
(2,236)
|
3,745
|
|
Total deferred income tax expense (recovery)
|
$ (1,120)
|
$ 5,114
|
$ 1,664
|
$ 7,229
|
|
Total income tax expense (recovery) recognized in net earnings
|
$ 27,511
|
$ 5,145
|
$ 77,996
|
$ 4,700
|
|
(in thousands)
|
Taxes (Payable)
Receivable
|
|
Income taxes receivable - December 31, 2023
|
$ 5,935
|
|
Current income tax recovery - income statement
|
2,029
|
|
Global minimum income tax expense
|
(78,361)
|
|
Current income tax expense - statement of OCI
|
(3,709)
|
|
Income taxes paid
|
(2,734)
|
|
Foreign exchange adjustments
|
(129)
|
|
Income taxes payable - September 30, 2024
|
$ (76,969)
|
|
Comprised of:
|
|
|
Current income taxes receivable
|
$ 1,392
|
|
Non-current global minimum income tax payable
|
(78,361)
|
|
Income taxes payable - September 30, 2024
|
$ (76,969)
|
|
Operating cash inflow for the three months ended September 30, 2023
|
$
|
171,103
|
|
Variance attributable to revenue (see page 20):
|
$
|
85,116
|
|
Changes in accounts receivable
|
|
3,174
|
|
Total increase to cash inflows attributable to sales
|
$
|
88,290
|
|
Variance attributable to cost of sales, excluding depletion:
|
||
|
Sales volume
|
$
|
(4,694)
|
|
Sales mix differences
|
898
|
|
|
Cost per ounce
|
(1,706)
|
|
|
Cost related to delay ounces 1
|
1,698
|
|
|
Changes in working capital, excluding accounts receivable
|
1,432
|
|
|
Total increase to cash outflows attributable to cost of sales
|
$
|
(2,372)
|
|
Total increase to net cash inflows attributable to gross margin
|
$
|
85,918
|
|
Other variances:
|
||
|
General and administrative
|
106
|
|
|
Donation and community investment
|
(448)
|
|
|
Finance costs
|
27
|
|
|
Income taxes
|
3,837
|
|
|
Other
|
|
(6,206)
|
|
Total increase to net cash inflows
|
$
|
83,234
|
|
Operating cash inflow for the three months ended September 30, 2024
|
$
|
254,337
|
| 1) |
The cost of sales related to delay ounces is a non-cash expense (see footnote 3 on page 8 of this MD&A for more information).
|
|
Three Months Ended
September 30 |
||
|
(in thousands)
|
2024
|
2023
|
|
Credit facility extension fees
|
$ (11)
|
$ (13)
|
|
Share purchase options exercised
|
847
|
93
|
|
Lease payments
|
(149)
|
(169)
|
|
Dividends paid
|
(69,984)
|
(66,994)
|
|
Cash used for financing activities
|
$ (69,297)
|
$ (67,083)
|
|
Three Months Ended
September 30 |
||
|
(in thousands)
|
2024
|
2023
|
|
Payments for the acquisition of PMPAs 1:
|
|
|
|
Mineral Park PMPA
|
$ (25,000)
|
$ -
|
|
Panoro early deposit PMPA
|
-
|
(250)
|
|
Blackwater Gold PMPA
|
-
|
(20,000)
|
|
Blackwater Silver PMPA
|
-
|
(70,400)
|
|
|
$ (25,000)
|
$ (90,650)
|
|
Acquisition of long-term equity investments
|
(728)
|
(5,006)
|
|
Payments for the acquisition of new royalty agreements:
|
|
|
|
Black Pine Royalty
|
-
|
(3,602)
|
|
DeLamar Royalty
|
(4,875)
|
-
|
|
Other
|
(630)
|
355
|
|
Total cash (used for) generated from investing activities
|
$ (31,233)
|
$ (98,903)
|
| 1) |
Excludes closing costs.
|
|
Operating cash inflow for the nine months ended September 30, 2023
|
$
|
508,584
|
|
Variance attributable to revenue (see page 25):
|
$
|
201,550
|
|
Changes in accounts receivable
|
|
691
|
|
Total increase to cash inflows attributable to sales
|
$
|
202,241
|
|
Variance attributable to cost of sales, excluding depletion:
|
||
|
Sales volume
|
$
|
(17,879)
|
|
Sales mix differences
|
10,727
|
|
|
Cost per ounce
|
(3,308)
|
|
|
Cost related to delay ounces 1
|
1,698
|
|
|
Changes in working capital, excluding accounts receivable
|
|
1,668
|
|
Total increase to cash outflows attributable to cost of sales
|
$
|
(7,094)
|
|
Total increase to net cash inflows attributable to gross margin
|
$
|
195,147
|
|
Other variances:
|
||
|
General and administrative
|
(1,432)
|
|
|
Donation and community investment
|
711
|
|
|
Share based compensation - PSUs
|
5,546
|
|
|
Finance costs
|
(87)
|
|
|
Income taxes
|
7,978
|
|
|
Other
|
|
(8,337)
|
|
Total increase to net cash inflows
|
$
|
199,526
|
|
Operating cash inflow for the nine months ended September 30, 2024
|
$
|
708,110
|
| 1) |
The cost of sales related to delay ounces is a non-cash expense (see footnote 3 on page 8 of this MD&A for more information).
|
|
Nine Months Ended
September 30 |
||
|
(in thousands)
|
2024
|
2023
|
|
Credit facility extension fees
|
$ (936)
|
$ (859)
|
|
Share purchase options exercised
|
13,011
|
10,603
|
|
Lease payments
|
(444)
|
(548)
|
|
Dividends paid
|
(209,108)
|
(198,085)
|
|
Cash used for financing activities
|
$ (197,477)
|
$ (188,889)
|
|
Nine Months Ended
September 30 |
||
|
(in thousands)
|
2024
|
2023
|
|
Payments for the acquisition of PMPAs 1:
|
|
|
|
Platreef PMPA
|
$ (411,500)
|
$ -
|
|
Kudz Ze Kayah PMPA
|
(38,500)
|
-
|
|
Curipamba PMPA
|
(100)
|
-
|
|
Cangrejos PMPA
|
(10,200)
|
-
|
|
Mineral Park PMPA
|
(50,000)
|
-
|
|
Panoro early deposit PMPA
|
-
|
(1,000)
|
|
Goose PMPA
|
-
|
(62,500)
|
|
Blackwater Gold PMPA
|
-
|
(30,000)
|
|
Blackwater Silver PMPA
|
-
|
(105,600)
|
|
Cangrejos PMPA
|
-
|
(12,000)
|
|
|
$ (510,300)
|
$ (211,100)
|
|
Net proceeds on disposition of PMPA
|
|
|
|
Goose PMPA
|
-
|
46,400
|
|
Acquisition of long-term equity investments
|
(1,479)
|
(13,181)
|
|
Proceeds on disposal of long-term equity investments
|
177,088
|
-
|
|
Payments for the acquisition of new Royalty Agreement:
|
|
|
|
Black Pine Royalty
|
-
|
(3,602)
|
|
DeLamar Royalty
|
(9,750)
|
-
|
|
Mt Todd Royalty
|
(17,000)
|
-
|
|
Other
|
(1,595)
|
(829)
|
|
Total cash used for investing activities
|
$ (363,036)
|
$ (182,312)
|
| 1) |
Excludes closing costs.
|
|
Mineral Stream Interests
|
Attributable
Payable
Production to be
Purchased
|
Per Ounce Cash
Payment 1
|
Term of
Agreement |
Date of
Original Contract |
|
|
Constancia
|
50%
|
$
|
425 ²
|
Life of Mine
|
8-Aug-12
|
|
Salobo
|
75%
|
$
|
425
|
Life of Mine
|
28-Feb-13
|
|
Sudbury
|
70%
|
$
|
400
|
20 years
|
28-Feb-13
|
|
San Dimas
|
variable ³
|
$
|
637
|
Life of Mine
|
10-May-18
|
|
Stillwater
|
100%
|
|
18% ⁴
|
Life of Mine
|
16-Jul-18
|
|
Marathon
|
100% ⁵
|
|
18% ⁴
|
Life of Mine
|
26-Jan-22
|
|
Other
|
|
|
|
|
|
|
Minto
|
100% ⁶
|
|
50% ⁶
|
Life of Mine
|
20-Nov-08
|
|
Copper World
|
100%
|
$
|
450
|
Life of Mine
|
10-Feb-10
|
|
Marmato
|
10.5% ⁵
|
|
18% ⁴
|
Life of Mine
|
5-Nov-20
|
|
Santo Domingo
|
100% ⁵
|
|
18% ⁴
|
Life of Mine
|
24-Mar-21
|
|
Fenix
|
6% ⁵
|
|
20% ⁵
|
Life of Mine
|
15-Nov-21
|
|
Blackwater
|
8% ⁵
|
|
35%
|
Life of Mine
|
13-Dec-21
|
|
Curipamba
|
50% ⁵
|
|
18% ⁴
|
Life of Mine
|
17-Jan-22
|
|
Goose
|
2.78% ⁵
|
|
18% ⁴
|
Life of Mine
|
8-Feb-22
|
|
Cangrejos
|
6.6% ⁵
|
|
18% ⁴
|
Life of Mine
|
16-May-23
|
|
Platreef
|
62.5% ⁵
|
$
|
100 ⁵
|
Life of Mine ⁵
|
7-Dec-21 ⁸
|
|
Curraghinalt
|
3.05% ⁵
|
|
18% ⁴
|
Life of Mine
|
15-Nov-23
|
|
Kudz Ze Kayah
|
6.875% ⁷
|
|
20%
|
Life of Mine
|
22-Dec-21 ⁸
|
|
Early Deposit
|
|
|
|
|
|
|
Toroparu
|
10%
|
$
|
400
|
Life of Mine
|
11-Nov-13
|
|
Cotabambas
|
25% ⁵
|
$
|
450
|
Life of Mine
|
21-Mar-16
|
|
Kutcho
|
100%
|
|
20%
|
Life of Mine
|
14-Dec-17
|
| 1) |
The production payment is measured as either a fixed amount per ounce of gold delivered, or as a percentage of the spot price of gold on the date of delivery. Contracts where the payment is a fixed amount per ounce of
gold delivered are subject to an annual inflationary increase, with the exception of Sudbury. Additionally, should the prevailing market price for gold be lower than this fixed amount, the per ounce cash payment will be reduced to the
prevailing market price, subject to an annual inflationary factor.
|
| 2) |
Subject to an increase to $550 per ounce of gold after the initial 40-year term.
|
| 3) |
Under the terms of the San Dimas PMPA, the Company is entitled to an amount equal to 25% of the payable gold production plus an additional amount of gold equal to 25% of the payable silver production converted to gold
at a fixed gold to silver exchange ratio of 70:1 from the San Dimas mine. If the average gold to silver price ratio decreases to less than 50:1 or increases to more than 90:1 for a period of 6 months or more, then the "70" shall be revised to
"50" or "90", as the case may be, until such time as the average gold to silver price ratio is between 50:1 to 90:1 for a period of 6 months or more in which event the "70" shall be reinstated. Currently, the fixed gold to silver exchange ratio
is 70:1.
|
| 4) |
To be increased to 22% once the market value of all metals delivered to Wheaton, net of the per ounce cash payment, exceeds the initial upfront cash deposit.
|
| 5) |
Under certain PMPAs, the Company’s attributable gold percentage will be reduced once certain thresholds are achieved:
|
| a. |
Marathon – reduced to 67% once the Company has received 150,000 ounces of gold.
|
| b. |
Marmato – reduced to 5.25% once Wheaton has received 310,000 ounces of gold.
|
| c. |
Santo Domingo – reduced to 67% once the Company has received 285,000 ounces of gold.
|
| d. |
Fenix – reduced to 4% once the Company has received 90,000 ounces of gold, with a further reduction to 3.5% once the Company has received 140,000 ounces. Please see Subsequent Events on page 44 of the MD&A for
more information.
|
| e. |
Blackwater – reduced to 4% once the Company has received 464,000 ounces of gold.
|
| f. |
Curipamba – reduced to 33% once the Company has received 145,000 ounces of gold.
|
| g. |
Goose – reduced to 1.44% once the Company has received 87,100 ounces of gold, with a further reduction to 1% once the Company has received 134,000 ounces.
|
| h. |
Cangrejos – reduced to 4.4% once the Company has received 700,000 ounces of gold.
|
| i. |
Platreef - reduced to 50% once the Company has received 218,750 ounces of gold, with a further reduction to 3.125% once the Company has received 428,300 ounces, at which point the per ounce cash payment increases to
80% of the spot price of gold. If certain thresholds are met, including if production through the Platreef project concentrator achieves 5.5 Mtpa, the 3.125% residual gold stream will terminate.
|
| j. |
Curraghinalt – reduced to 1.5% once the Company has received 125,000 ounces of gold.
|
| k. |
Cotabambas – reduced to 16.67% once the Company has received 90 million silver equivalent ounces.
|
| 6) |
The Company is committed to acquire 100% of the first 30,000 ounces of gold produced per annum and 50% thereafter. On May 13, 2023, Minto Metals Corp., announced the suspension of operations at the Minto mine.
|
| 7) |
Under the Kudz Ze Kayah PMPA, the Company will be entitled to purchase staged percentages of produced gold ranging from 6.875% to 7.375% until 330,000 ounces of gold are produced and delivered, thereafter reducing to
a range of 5.625% to 6.125% until a further 59,800 ounces of gold are produced and delivered, further reducing to a range of 5% to 5.5% until a further 270,200 ounces of gold are produced and delivered for a total of 660,000 ounces of gold
thereafter ranging between 6.25% and 6.75%.
|
| 8) |
On February 27, 2024, the Company closed the Orion Purchase Agreement to acquire the Platreef and Kudz Ze Kayah PMPAs.
|
|
Mineral Stream Interests
|
Attributable
Payable
Production to be
Purchased
|
Per Ounce Cash
Payment 1
|
Term of
Agreement |
Date of
Original Contract |
|
|
Peñasquito
|
25%
|
$
|
4.50
|
Life of Mine
|
24-Jul-07
|
|
Constancia
|
100%
|
$
|
6.26 ²
|
Life of Mine
|
8-Aug-12
|
|
Antamina
|
33.75%
|
|
20%
|
Life of Mine
|
3-Nov-15
|
|
Other
|
|
|
|
|
|
|
Los Filos
|
100%
|
$
|
4.68
|
25 years
|
15-Oct-04
|
|
Zinkgruvan
|
100%
|
$
|
4.68
|
Life of Mine
|
8-Dec-04
|
|
Stratoni
|
100%
|
$
|
11.54
|
Life of Mine
|
23-Apr-07
|
|
Neves-Corvo
|
100%
|
$
|
4.50
|
50 years
|
5-Jun-07
|
|
Aljustrel
|
100% ³
|
|
50%
|
50 years
|
5-Jun-07
|
|
Minto
|
100% ⁴
|
$
|
4.39
|
Life of Mine
|
20-Nov-08
|
|
Pascua-Lama
|
25%
|
$
|
3.90
|
Life of Mine
|
8-Sep-09
|
|
Copper World
|
100%
|
$
|
3.90
|
Life of Mine
|
10-Feb-10
|
|
Loma de La Plata
|
12.5%
|
$
|
4.00
|
Life of Mine
|
n/a ⁵
|
|
Marmato
|
100% ⁶
|
|
18% ⁷
|
Life of Mine
|
5-Nov-20
|
|
Cozamin
|
50% ⁶
|
|
10%
|
Life of Mine
|
11-Dec-20
|
|
Blackwater
|
50% ⁶
|
|
18% ⁷
|
Life of Mine
|
13-Dec-21
|
|
Curipamba
|
75%
|
|
18% ⁷
|
Life of Mine
|
17-Jan-22
|
|
Mineral Park
|
100%
|
|
18% ⁷
|
Life of Mine
|
24-Oct-23
|
|
Kudz Ze Kayah
|
6.875 ⁸
|
|
20%
|
Life of Mine
|
22-Dec-21 ⁹
|
|
Early Deposit
|
|
|
|
|
|
|
Toroparu
|
50%
|
$
|
3.90
|
Life of Mine
|
11-Nov-13
|
|
Cotabambas
|
100% ⁶
|
$
|
5.90
|
Life of Mine
|
21-Mar-16
|
|
Kutcho
|
100%
|
|
20%
|
Life of Mine
|
14-Dec-17
|
| 1) |
The production payment is measured as either a fixed amount per unit of silver delivered, or as a percentage of the spot price of silver on the date of delivery. Contracts where the payment is a fixed amount per ounce
of silver delivered are subject to an annual inflationary increase, with the exception of Loma de La Plata. Additionally, should the prevailing market price for silver be lower than this fixed amount, the per ounce cash payment will be reduced
to the prevailing market price, subject to an annual inflationary factor.
|
| 2) |
Subject to an increase to $9.90 per ounce of silver after the initial 40-year term.
|
| 3) |
Wheaton only has the rights to silver contained in concentrate containing less than 15% copper at the Aljustrel mine. On September 12, 2023, it was announced that the production of the zinc and lead concentrates at
the Aljustrel mine will be halted from September 24, 2023 until the second quarter of 2025.
|
| 4) |
On May 13, 2023, Minto Metals Corp. announced the suspension of operations at the Minto mine.
|
| 5) |
Terms of the agreement not yet finalized.
|
| 6) |
Under certain PMPAs, the Company’s attributable silver percentage will be reduced once certain thresholds are achieved:
|
| a. |
Marmato – reduced to 50% once the Company has received 2.15 million ounces of silver.
|
| b. |
Cozamin – reduced to 33% once the Company has received 10 million ounces of silver.
|
| c. |
Blackwater – reduced to 33% once the Company has received 17.8 million ounces of silver.
|
| d. |
Cotabambas – reduced to 66.67% once the Company has received 90 million silver equivalent ounces.
|
| 7) |
To be increased to 22% once the total market value of all metals delivered to the Company, net of the per ounce cash payment, exceeds the initial upfront cash deposit.
|
| 8) |
Under the Kudz Ze Kayah PMPA, the Company will be entitled to purchase: staged percentages of produced silver ranging from 6.875% to 7.375% until 43.30 million ounces of silver are produced and delivered, thereafter
reducing to a range of 5.625% to 6.125% until a further 7.96 million ounces of silver are produced and delivered, further reducing to a range of 5% to 5.5% until a further 35.34 million ounces of silver are produced and delivered for a total of
86.6 million ounces of silver and thereafter ranging between 6.25% and 6.75%.
|
| 9) |
On February 27, 2024, the Company closed the Orion Purchase Agreement to acquire the Platreef and Kudz Ze Kayah PMPAs.
|
|
Mineral Stream Interests
|
Attributable Payable Production to be Purchased
|
Per Unit of Measurement Cash Payment 1
|
Term of
Agreement |
Date of
Original Contract |
|
|
Palladium
|
|
|
|
|
|
|
Stillwater
|
4.5% ²
|
|
18% ³
|
Life of Mine
|
16-Jul-18
|
|
Platreef
|
5.25% ²
|
|
30% ²
|
Life of Mine ²
|
7-Dec-21 ⁴
|
|
Platinum
|
|
|
|
|
|
|
Marathon
|
22% ²
|
|
18% ³
|
Life of Mine
|
26-Jan-22
|
|
Platreef
|
5.25% ²
|
|
30% ²
|
Life of Mine ²
|
7-Dec-21 ⁴
|
|
Cobalt
|
|
|
|
|
|
|
Voisey's Bay
|
42.4% ²
|
|
18% ³
|
Life of Mine
|
11-Jun-18
|
| 1) |
The production payment is measured as either a fixed amount per unit of metal delivered, or as a percentage of the spot price of the underlying metal on the date of delivery.
|
| 2) |
Under certain PMPAs, the Company’s attributable metal percentage will be reduced once certain thresholds are achieved:
|
| a. |
Stillwater – reduced to 2.25% once the Company has received 375,000 ounces of palladium, with a further reduction to 1% once the Company has received 550,000 ounces.
|
| b. |
Platreef – reduced to 3% once the Company has received 350,000 ounces of combined palladium and platinum, with a further reduction to 0.1% once the Company has received a combined 485,115 ounces, at which point the
per ounce cash payment increases to 80% of the spot price of palladium and platinum. If certain thresholds are met, including if production through the Platreef project concentrator achieves 5.5 Mtpa, the 0.1% residual palladium and platinum
stream will terminate.
|
| c. |
Marathon – reduced to 15% once the Company has received 120,000 ounces of platinum.
|
| d. |
Voisey’s Bay – reduced to 21.2% once the Company has received 31 million pounds of cobalt.
|
| 3) |
To be increased to 22% once the market value of all metals delivered to Wheaton, net of the per unit cash payment, exceeds the initial upfront cash deposit.
|
| 4) |
On February 27, 2024, the Company closed the Orion Purchase Agreement to acquire the Platreef and Kudz Ze Kayah PMPAs.
|
|
Projected Payment Dates 1
|
||||||||||||||
|
(in thousands)
|
2024
|
2025 - 2026
|
2027 - 2028
|
After 2028
|
Total
|
|||||||||
|
Payments for mineral stream interests & royalty
|
|
|
|
|||||||||||
|
Salobo 2
|
$
|
163,000
|
$
|
-
|
$
|
16,000
|
$
|
64,000
|
|
$
|
243,000
|
|||
|
Copper World 3
|
-
|
131,429
|
99,721
|
-
|
|
|
231,150
|
|||||||
|
Marmato
|
40,016
|
81,984
|
-
|
-
|
|
|
122,000
|
|||||||
|
Santo Domingo
|
-
|
162,500
|
97,500
|
-
|
|
|
260,000
|
|||||||
|
Fenix Gold
|
-
|
25,000
|
-
|
-
|
|
|
25,000
|
|||||||
|
Curipamba
|
250
|
162,000
|
-
|
-
|
|
|
162,250
|
|||||||
|
Marathon
|
-
|
59,264
|
88,895
|
-
|
|
|
148,159
|
|||||||
|
Cangrejos
|
9,100
|
126,000
|
126,000
|
-
|
|
|
261,100
|
|||||||
|
Curraghinalt
|
-
|
55,000
|
-
|
-
|
|
|
55,000
|
|||||||
|
Loma de La Plata
|
-
|
-
|
-
|
32,400
|
|
|
32,400
|
|||||||
|
Mineral Park
|
25,000
|
40,000
|
-
|
-
|
|
|
65,000
|
|||||||
|
Kudz Ze Kayah
|
-
|
5,000
|
-
|
-
|
|
|
5,000
|
|||||||
|
Payments for early deposit mineral stream interest
|
|
|
|
|||||||||||
|
Cotabambas
|
-
|
-
|
-
|
126,000
|
|
|
126,000
|
|||||||
|
Toroparu
|
-
|
-
|
-
|
138,000
|
|
|
138,000
|
|||||||
|
Kutcho
|
-
|
-
|
-
|
58,000
|
|
|
58,000
|
|||||||
|
Leases liabilities
|
|
222
|
|
|
1,186
|
|
|
1,311
|
|
|
4,673
|
|
|
7,392
|
|
Total contractual obligations
|
$
|
237,588
|
|
$
|
849,363
|
|
$
|
429,427
|
|
$
|
423,073
|
|
$
|
1,939,451
|
| 1) |
Projected payment date based on management estimate. Dates may be updated in the future as additional information is received.
|
| 2) |
As more fully explained below, the expansion payment relative to the Salobo III expansion project is dependent on the timing and size of the throughput expansion.
|
| 3) |
Figure includes contingent transaction costs of $1 million.
|
| i. |
Adjusted net earnings and adjusted net earnings per share are calculated by removing the effects of non-cash impairment charges (reversals) (if any), non-cash fair value (gains) losses and other one-time (income)
expenses as well as the reversal of non-cash income tax expense (recovery) which is offset by income tax expense (recovery) recognized in the Statements of Shareholders’ Equity and OCI, respectively. The
Company believes that, in addition to conventional measures prepared in accordance with IFRS, management and certain investors use this information to evaluate the Company’s performance.
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
|||||||||||
|
(in thousands, except for per share amounts)
|
|
2024
|
|
2023
|
|
2024
|
|
2023
|
||||
|
Net earnings
|
|
$
|
154,635
|
$
|
116,371
|
|
$
|
440,993
|
$
|
369,209
|
||
|
Add back (deduct):
|
|
|
|
|
|
|
||||||
|
Gain on disposal of Mineral Stream Interest
|
|
|
-
|
-
|
|
|
-
|
(5,027)
|
||||
|
(Gain) loss on fair value adjustment of share purchase warrants held
|
|
|
(523)
|
143
|
|
|
(903)
|
248
|
||||
|
Deferred income tax (expense) recovery recognized in the Statement of OCI
|
|
|
(1,134)
|
5,115
|
|
|
1,632
|
7,205
|
||||
|
Income tax recovery related to prior year disposal of Mineral Stream Interest
|
|
|
-
|
-
|
|
|
-
|
(2,672)
|
||||
|
Other
|
|
|
(175)
|
|
|
(162)
|
|
|
(521)
|
|
|
(482)
|
|
Adjusted net earnings
|
|
$
|
152,803
|
|
$
|
121,467
|
|
$
|
441,201
|
|
$
|
368,481
|
|
Divided by:
|
|
|
|
|
|
|
||||||
|
Basic weighted average number of shares outstanding
|
|
|
453,641
|
452,975
|
|
|
453,389
|
452,748
|
||||
|
Diluted weighted average number of shares outstanding
|
|
|
454,302
|
|
|
453,538
|
|
|
454,037
|
|
|
453,419
|
|
Equals:
|
|
|
|
|
|
|
||||||
|
Adjusted earnings per share - basic
|
|
$
|
0.337
|
$
|
0.268
|
|
$
|
0.973
|
$
|
0.814
|
||
|
Adjusted earnings per share - diluted
|
|
$
|
0.336
|
|
$
|
0.268
|
|
$
|
0.972
|
|
$
|
0.813
|
| ii. |
Operating cash flow per share (basic and diluted) is calculated by dividing cash generated by operating activities by the weighted average number of shares outstanding (basic and diluted). The Company presents
operating cash flow per share as management and certain investors use this information to evaluate the Company’s performance in comparison to other companies in the precious metal mining industry who present results on a similar basis.
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
|||||||||||
|
(in thousands, except for per share amounts)
|
|
2024
|
|
2023
|
|
2024
|
|
2023
|
||||
|
Cash generated by operating activities
|
|
$
|
254,337
|
|
$
|
171,103
|
|
$
|
708,110
|
|
$
|
508,584
|
|
Divided by:
|
|
|
|
|
|
|
||||||
|
Basic weighted average number of shares outstanding
|
|
|
453,641
|
452,975
|
|
|
453,389
|
452,748
|
||||
|
Diluted weighted average number of shares outstanding
|
|
|
454,302
|
|
|
453,538
|
|
|
454,037
|
|
|
453,419
|
|
Equals:
|
|
|
|
|
|
|
||||||
|
Operating cash flow per share - basic
|
|
$
|
0.561
|
$
|
0.378
|
|
$
|
1.562
|
$
|
1.123
|
||
|
Operating cash flow per share - diluted
|
|
$
|
0.560
|
|
$
|
0.377
|
|
$
|
1.560
|
|
$
|
1.122
|
| iii. |
Average cash cost of gold, silver and palladium on a per ounce basis and cobalt on a per pound basis is calculated by dividing the total cost of sales, less depletion and cost of sales related to delay ounces, by the
ounces or pounds sold. In the precious metal mining industry, this is a common performance measure but does not have any standardized meaning prescribed by IFRS. In addition to conventional measures prepared in accordance with IFRS, management
and certain investors use this information to evaluate the Company’s performance and ability to generate cash flow.
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
|||||||||||
|
(in thousands, except for gold and palladium ounces sold and per unit amounts)
|
|
2024
|
|
2023
|
|
2024
|
|
2023
|
||||
|
Cost of sales
|
|
$
|
110,840
|
$
|
96,243
|
|
$
|
348,943
|
$
|
306,321
|
||
|
Less: depletion
|
|
|
(55,530)
|
(46,435)
|
|
|
(178,071)
|
(145,908)
|
||||
|
Less: cost of sales related to delay ounces 1
|
|
|
(1,698)
|
|
|
-
|
|
|
(1,698)
|
|
|
-
|
|
Cash cost of sales
|
|
$
|
53,612
|
|
$
|
49,808
|
|
$
|
169,174
|
|
$
|
160,413
|
|
Cash cost of sales is comprised of:
|
|
|
|
|
|
|
||||||
|
Total cash cost of gold sold
|
|
$
|
33,287
|
$
|
33,014
|
|
$
|
107,715
|
$
|
98,724
|
||
|
Total cash cost of silver sold
|
|
|
19,485
|
15,121
|
|
|
57,811
|
56,351
|
||||
|
Total cash cost of palladium sold
|
|
|
650
|
946
|
|
|
2,272
|
2,699
|
||||
|
Total cash cost of cobalt sold 2
|
|
|
190
|
|
|
727
|
|
|
1,376
|
|
|
2,639
|
|
Total cash cost of sales
|
|
$
|
53,612
|
|
$
|
49,808
|
|
$
|
169,174
|
|
$
|
160,413
|
|
Divided by:
|
|
|
|
|
|
|
||||||
|
Total gold ounces sold
|
|
|
75,694
|
74,426
|
|
|
245,039
|
212,325
|
||||
|
Total silver ounces sold
|
|
|
3,875
|
2,965
|
|
|
11,765
|
11,151
|
||||
|
Total palladium ounces sold
|
|
|
3,761
|
4,242
|
|
|
12,836
|
10,580
|
||||
|
Total cobalt pounds sold
|
|
|
88
|
|
|
198
|
|
|
485
|
|
|
786
|
|
Equals:
|
|
|
|
|
|
|
||||||
|
Average cash cost of gold (per ounce)
|
|
$
|
440
|
$
|
444
|
|
$
|
440
|
$
|
465
|
||
|
Average cash cost of silver (per ounce)
|
|
$
|
5.03
|
$
|
5.10
|
|
$
|
4.91
|
$
|
5.05
|
||
|
Average cash cost of palladium (per ounce)
|
|
$
|
173
|
$
|
223
|
|
$
|
177
|
$
|
255
|
||
|
Average cash cost of cobalt (per pound) 1
|
|
$
|
2.15
|
|
$
|
3.66
|
|
$
|
2.84
|
|
$
|
3.36
|
| 1) |
The cost of sales related to delay ounces is a non-cash expense (see footnote 3 on page 8 of this MD&A for more information).
|
| 2) |
Cash cost per pound of cobalt sold during the third quarter of 2023 was net of a previously recorded inventory write-down of $0.1 million (nine months - $1.6 million), resulting in a decrease of $0.51 per pound of
cobalt sold (nine months - $2.05 per pound of cobalt sold).
|
| iv. |
Cash operating margin is calculated by adding back depletion and the cost of sales related to delay ounces to the gross margin. Cash operating margin on a per ounce or per pound basis is calculated by dividing the
cash operating margin by the number of ounces or pounds sold during the period. The Company presents cash operating margin as management and certain investors use this information to evaluate the Company’s performance in comparison to other
companies in the precious metal mining industry who present results on a similar basis as well as to evaluate the Company’s ability to generate cash flow.
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
|||||||||||
|
(in thousands, except for gold and palladium ounces sold and per unit amounts)
|
|
2024
|
|
2023
|
|
2024
|
|
2023
|
||||
|
Gross margin
|
|
$
|
197,413
|
$
|
126,894
|
|
$
|
555,180
|
$
|
396,252
|
||
|
Add back: depletion
|
|
|
55,530
|
46,435
|
|
|
178,071
|
145,908
|
||||
|
Add back: cost of sales related to delay ounces 1
|
|
|
1,698
|
|
|
-
|
|
|
1,698
|
|
|
-
|
|
Cash operating margin
|
|
$
|
254,641
|
|
$
|
173,329
|
|
$
|
734,949
|
|
$
|
542,160
|
|
Cash operating margin is comprised of:
|
|
|
|
|
|
|
||||||
|
Total cash operating margin of gold sold
|
|
$
|
155,234
|
$
|
111,693
|
|
$
|
453,645
|
$
|
314,690
|
||
|
Total cash operating margin of silver sold
|
|
|
95,664
|
55,251
|
|
|
265,287
|
206,778
|
||||
|
Total cash operating margin of palladium sold
|
|
|
2,994
|
4,361
|
|
|
10,259
|
12,223
|
||||
|
Total cash operating margin of cobalt sold
|
|
|
749
|
|
|
2,024
|
|
|
5,758
|
|
|
8,469
|
|
Total cash operating margin
|
|
$
|
254,641
|
|
$
|
173,329
|
|
$
|
734,949
|
|
$
|
542,160
|
|
Divided by:
|
|
|
|
|
|
|
||||||
|
Total gold ounces sold
|
|
|
75,694
|
74,426
|
|
|
245,039
|
212,325
|
||||
|
Total silver ounces sold
|
|
|
3,875
|
2,965
|
|
|
11,765
|
11,151
|
||||
|
Total palladium ounces sold
|
|
|
3,761
|
4,242
|
|
|
12,836
|
10,580
|
||||
|
Total cobalt pounds sold
|
|
|
88
|
|
|
198
|
|
|
485
|
|
|
786
|
|
Equals:
|
|
|
|
|
|
|
||||||
|
Cash operating margin per gold ounce sold
|
|
$
|
2,051
|
$
|
1,500
|
|
$
|
1,851
|
$
|
1,482
|
||
|
Cash operating margin per silver ounce sold
|
|
$
|
24.68
|
$
|
18.63
|
|
$
|
22.55
|
$
|
18.55
|
||
|
Cash operating margin per palladium ounce sold
|
|
$
|
796
|
$
|
1,028
|
|
$
|
799
|
$
|
1,155
|
||
|
Cash operating margin per cobalt pound sold
|
|
$
|
8.50
|
|
$
|
10.21
|
|
$
|
11.87
|
|
$
|
10.77
|
| 1) |
The cost of sales related to delay ounces is a non-cash expense (see footnote 3 on page 8 of this MD&A for more information).
|
|
December 31, 2023 (6)
|
December 31, 2022
|
|||||||||||||
|
|
|
Proven
|
Probable
|
Proven & Probable
|
|
Proven & Probable
|
||||||||
|
|
|
Tonnage
|
Grade
|
Contained
|
Tonnage
|
Grade
|
Contained
|
Tonnage
|
Grade
|
Contained
|
Process Recovery % (7)
|
Tonnage
|
Grade
|
Contained
|
|
Asset
|
Interest
|
Mt
|
g/t / %
|
Moz / Mlbs
|
Mt
|
g/t / %
|
Moz / Mlbs
|
Mt
|
g/t / %
|
Moz / Mlbs
|
Mt
|
g/t / %
|
Moz / Mlbs
|
|
|
Gold
|
|
|
|
|
|
|
|
|
|
|||||
|
Salobo (10)
|
75%
|
216.9
|
0.38
|
2.64
|
599.8
|
0.34
|
6.60
|
816.7
|
0.35
|
9.24
|
72%
|
834.3
|
0.35
|
9.48
|
|
Stillwater (13)
|
100%
|
10.9
|
0.36
|
0.13
|
49.5
|
0.37
|
0.59
|
60.4
|
0.37
|
0.72
|
69%
|
60.2
|
0.37
|
0.72
|
|
Constancia
|
50%
|
242.8
|
0.05
|
0.39
|
31.1
|
0.03
|
0.03
|
273.9
|
0.05
|
0.43
|
61%
|
246.1
|
0.06
|
0.47
|
|
Sudbury (11)
|
70%
|
8.2
|
0.40
|
0.11
|
20.2
|
0.22
|
0.14
|
28.4
|
0.27
|
0.25
|
75%
|
30.4
|
0.33
|
0.32
|
|
San Dimas (14)
|
25%
|
0.5
|
3.47
|
0.06
|
0.4
|
2.69
|
0.04
|
0.9
|
3.11
|
0.09
|
95%
|
1.1
|
3.32
|
0.12
|
|
Marmato (11,15)
|
10.5%
|
0.2
|
4.31
|
0.03
|
3.0
|
3.07
|
0.30
|
3.3
|
3.16
|
0.33
|
90%
|
3.3
|
3.16
|
0.33
|
|
Cangrejos (11,31)
|
6.6%
|
-
|
-
|
-
|
43.5
|
0.55
|
0.76
|
43.5
|
0.55
|
0.76
|
85%
|
-
|
-
|
-
|
|
Platreef (11,35)
|
62.5%
|
-
|
-
|
-
|
69.8
|
0.30
|
0.67
|
69.8
|
0.30
|
0.67
|
79%
|
-
|
-
|
-
|
|
Kone (11,39)
|
19.5%
|
-
|
-
|
-
|
26.7
|
0.72
|
0.62
|
26.7
|
0.72
|
0.62
|
89%
|
-
|
-
|
-
|
|
Blackwater (11,27)
|
8%
|
23.4
|
0.74
|
0.56
|
0.7
|
0.80
|
0.02
|
24.1
|
0.74
|
0.57
|
91%
|
19.8
|
0.74
|
0.47
|
|
Santo Domingo (11,25)
|
100%
|
65.4
|
0.08
|
0.17
|
326.9
|
0.03
|
0.34
|
392.3
|
0.04
|
0.51
|
61%
|
392.3
|
0.04
|
0.51
|
|
Marathon (11,28)
|
100%
|
111.6
|
0.07
|
0.25
|
12.5
|
0.06
|
0.02
|
124.2
|
0.07
|
0.28
|
71%
|
124.2
|
0.07
|
0.28
|
|
Copper World Complex (21)
|
100%
|
319.4
|
0.03
|
0.27
|
65.7
|
0.02
|
0.04
|
385.1
|
0.02
|
0.31
|
60%
|
-
|
-
|
-
|
|
Curipamba (11,29)
|
50%
|
1.6
|
2.83
|
0.14
|
1.7
|
2.23
|
0.12
|
3.2
|
2.52
|
0.26
|
53%
|
3.2
|
2.52
|
0.26
|
|
Goose (11,30)
|
2.78%
|
0.2
|
5.54
|
0.04
|
0.3
|
6.29
|
0.06
|
0.5
|
5.97
|
0.10
|
93%
|
0.8
|
5.97
|
0.14
|
|
Kutcho (12)
|
100%
|
6.8
|
0.37
|
0.08
|
10.6
|
0.39
|
0.13
|
17.4
|
0.38
|
0.21
|
41%
|
17.4
|
0.38
|
0.21
|
|
Fenix (11,26)
|
22%
|
8.3
|
0.50
|
0.13
|
6.8
|
0.45
|
0.10
|
15.1
|
0.48
|
0.23
|
75%
|
6.9
|
0.49
|
0.11
|
|
Curraghinalt (11,33)
|
3.05%
|
0.0
|
9.14
|
0.001
|
0.4
|
6.43
|
0.08
|
0.4
|
6.45
|
0.08
|
94%
|
-
|
-
|
-
|
|
Mt Todd (11,36)
|
1%
|
0.7
|
0.84
|
0.02
|
1.7
|
0.75
|
0.04
|
2.4
|
0.77
|
0.06
|
92%
|
-
|
-
|
-
|
|
Kudz Ze Kayah (11,34)
|
7.27%
|
-
|
-
|
-
|
1.1
|
1.32
|
0.05
|
1.1
|
1.32
|
0.05
|
64%
|
-
|
-
|
-
|
|
DeLamar (37)
|
1.5%
|
0.2
|
0.46
|
0.002
|
1.2
|
0.39
|
0.02
|
1.4
|
0.40
|
0.02
|
72%
|
-
|
-
|
-
|
|
Total Gold
|
|
|
|
5.02
|
|
|
10.76
|
|
|
15.78
|
|
|
|
13.43
|
|
Silver
|
|
|
|
|
|
|
|
|
|
|||||
|
Peñasquito (10)
|
25%
|
30.9
|
37.9
|
37.7
|
41.8
|
30.1
|
40.5
|
72.8
|
33.4
|
78.2
|
80%
|
79.1
|
34.0
|
86.5
|
|
Constancia
|
100%
|
485.6
|
2.7
|
42.9
|
62.1
|
2.2
|
4.5
|
547.7
|
2.7
|
47.3
|
70%
|
492.1
|
3.0
|
47.4
|
|
Antamina (10,11,18)
|
33.75%
|
|
|
|
|
|
|
|
|
|
||||
|
Copper
|
37.1
|
7.0
|
8.4
|
16.5
|
10.0
|
5.3
|
53.7
|
7.9
|
13.7
|
75%
|
63.6
|
7.4
|
15.1
|
|
|
Copper-Zinc
|
9.8
|
17.0
|
5.3
|
12.8
|
17.0
|
7.0
|
22.6
|
17.0
|
12.4
|
75%
|
31.7
|
14.1
|
14.4
|
|
|
Zinkgruvan
|
100%
|
|
|
|
|
|
|
|
|
|
||||
|
Zinc
|
4.3
|
62.1
|
8.6
|
6.7
|
80.9
|
17.5
|
11.0
|
73.6
|
26.1
|
83%
|
9.3
|
68.9
|
20.6
|
|
|
Copper
|
1.3
|
34.5
|
1.4
|
0.2
|
38.8
|
0.2
|
1.4
|
35.0
|
1.6
|
70%
|
1.7
|
33.6
|
1.8
|
|
|
Neves-Corvo
|
100%
|
|
|
|
|
|
|
|
|
|
||||
|
Copper
|
2.6
|
31.8
|
2.7
|
18.6
|
33.2
|
19.8
|
21.2
|
33.0
|
22.5
|
24%
|
21.2
|
33.2
|
22.6
|
|
|
Zinc
|
4.0
|
67.9
|
8.7
|
17.6
|
62.1
|
35.1
|
21.6
|
63.2
|
43.8
|
30%
|
22.3
|
62.9
|
45.1
|
|
|
Aljustrel (19)
|
100%
|
10.2
|
45.2
|
14.8
|
25.3
|
44.2
|
35.9
|
35.5
|
44.5
|
50.7
|
26%
|
35.5
|
44.5
|
50.7
|
|
Mineral Park
|
100%
|
42.4
|
2.6
|
3.5
|
141.3
|
2.4
|
11.1
|
183.7
|
2.5
|
14.6
|
61%
|
-
|
-
|
-
|
|
San Dimas (14)
|
25%
|
0.5
|
264.6
|
4.2
|
0.4
|
254.0
|
3.4
|
0.9
|
259.7
|
7.6
|
94%
|
1.1
|
272.8
|
9.5
|
|
Cozamin (11,20)
|
50%
|
|
|
|
|
|
|
|
|
|
||||
|
Copper
|
-
|
-
|
-
|
3.9
|
42.9
|
5.4
|
3.9
|
42.9
|
5.4
|
86%
|
5.4
|
45.6
|
8.0
|
|
|
Zinc
|
-
|
-
|
-
|
0.5
|
50.9
|
0.9
|
0.5
|
50.9
|
0.9
|
60%
|
0.7
|
44.5
|
1.0
|
|
|
Los Filos
|
100%
|
21.7
|
5.0
|
3.5
|
96.5
|
7.1
|
22.1
|
118.2
|
6.7
|
25.6
|
10%
|
118.2
|
6.7
|
25.6
|
|
Marmato (11,15)
|
100%
|
2.1
|
16.4
|
1.1
|
28.1
|
5.3
|
4.8
|
30.2
|
6.1
|
5.9
|
34%
|
30.2
|
6.1
|
5.9
|
|
Copper World Complex (21)
|
100%
|
319.4
|
5.7
|
58.3
|
65.7
|
4.3
|
9.1
|
385.1
|
5.4
|
67.4
|
75.5%
|
516.6
|
4.6
|
76.7
|
|
Blackwater (11,27)
|
50%
|
161.9
|
5.8
|
30.1
|
4.6
|
5.8
|
0.9
|
166.5
|
5.8
|
31.0
|
61%
|
166.5
|
5.8
|
31.0
|
|
Kutcho (12)
|
100%
|
6.8
|
24.5
|
5.4
|
10.6
|
30.1
|
10.2
|
17.4
|
27.9
|
15.6
|
46%
|
17.4
|
27.9
|
15.6
|
|
Curipamba (11,29)
|
75%
|
2.4
|
41.4
|
3.1
|
2.5
|
49.7
|
4.0
|
4.9
|
45.7
|
7.1
|
63%
|
4.9
|
45.7
|
7.1
|
|
Kudz Ze Kayah (11,34)
|
7.21%
|
-
|
-
|
-
|
1.1
|
137.5
|
4.8
|
1.1
|
137.5
|
4.8
|
86%
|
-
|
-
|
-
|
|
DeLamar (37)
|
1.5%
|
0.2
|
23.3
|
0.1
|
1.2
|
16.5
|
0.6
|
1.4
|
17.3
|
0.8
|
37%
|
-
|
-
|
-
|
|
Total Silver
|
|
|
|
239.7
|
|
|
243.1
|
|
|
482.8
|
|
|
|
484.6
|
|
Palladium
|
|
|
|
|
|
|
|
|
|
|||||
|
Platreef (11,35)
|
5.25%
|
-
|
-
|
-
|
5.5
|
2.0
|
0.35
|
5.5
|
2.0
|
0.35
|
87%
|
-
|
-
|
-
|
|
Stillwater (11,13)
|
4.5%
|
0.3
|
10.5
|
0.10
|
1.3
|
10.6
|
0.45
|
1.6
|
10.6
|
0.55
|
90%
|
1.8
|
10.6
|
0.60
|
|
Total Palladium
|
|
|
|
0.10
|
|
|
0.80
|
|
|
0.90
|
|
|
|
0.60
|
|
Platinum
|
|
|
|
|
|
|
|
|
|
|||||
|
Platreef (11,35)
|
5.25%
|
-
|
-
|
-
|
5.5
|
1.9
|
0.34
|
5.5
|
1.9
|
0.34
|
87%
|
-
|
-
|
-
|
|
Marathon (11,28)
|
22%
|
25.3
|
0.2
|
0.16
|
2.8
|
0.1
|
0.01
|
28.1
|
0.2
|
0.18
|
76%
|
28.1
|
0.2
|
0.18
|
|
Total Platinum
|
|
|
|
0.16
|
|
|
0.35
|
|
|
0.52
|
|
|
|
0.18
|
|
Cobalt
|
|
|
|
|
|
|
|
|
|
|||||
|
Voisey's Bay (11,22)
|
42.4%
|
6.6
|
0.10
|
15.1
|
6.6
|
0.12
|
17.3
|
13.2
|
0.11
|
32.3
|
84%
|
13.0
|
0.12
|
33.2
|
|
Total Cobalt
|
|
|
|
15.1
|
|
|
17.3
|
|
|
32.3
|
|
|
|
33.2
|
|
December 31, 2023 (6)
|
|||||||||||||
|
|
|
Measured
|
Indicated
|
Measured & Indicated
|
Inferred
|
||||||||
|
Tonnage
|
Grade
|
Contained
|
Tonnage
|
Grade
|
Contained
|
Tonnage
|
Grade
|
Contained
|
Tonnage
|
Grade
|
Contained
|
||
|
|
Interest
|
Mt
|
g/t / %
|
Moz / Mlbs
|
Mt
|
g/t / %
|
Moz / Mlbs
|
Mt
|
g/t / %
|
Moz / Mlbs
|
Mt
|
g/t / %
|
Moz / Mlbs
|
|
Gold
|
|
|
|
|
|
|
|||||||
|
Salobo (10)
|
75%
|
16.8
|
0.17
|
0.09
|
396.8
|
0.24
|
3.01
|
413.6
|
0.23
|
3.10
|
204.0
|
0.29
|
1.87
|
|
Stillwater (13)
|
100%
|
21.1
|
0.30
|
0.21
|
19.3
|
0.26
|
0.16
|
40.4
|
0.28
|
0.36
|
113.8
|
0.33
|
1.22
|
|
Constancia
|
50%
|
39.2
|
0.04
|
0.05
|
46.6
|
0.04
|
0.06
|
85.8
|
0.04
|
0.11
|
18.5
|
0.07
|
0.04
|
|
Sudbury (11)
|
70%
|
2.9
|
1.20
|
0.11
|
2.6
|
0.47
|
0.04
|
5.4
|
0.85
|
0.15
|
2.0
|
0.44
|
0.03
|
|
San Dimas (14)
|
25%
|
0.2
|
5.94
|
0.03
|
0.1
|
2.24
|
0.01
|
0.3
|
4.20
|
0.04
|
1.0
|
3.67
|
0.12
|
|
Marmato (11,15)
|
10.5%
|
0.1
|
5.04
|
0.01
|
1.7
|
2.28
|
0.13
|
1.8
|
2.40
|
0.14
|
1.9
|
2.43
|
0.15
|
|
Minto (38)
|
100%
|
-
|
-
|
-
|
11.1
|
0.53
|
0.19
|
11.1
|
0.53
|
0.19
|
13.0
|
0.49
|
0.21
|
|
Cangrejos (11,31)
|
6.6%
|
-
|
-
|
-
|
20.6
|
0.38
|
0.25
|
20.6
|
0.38
|
0.25
|
13.0
|
0.39
|
0.16
|
|
Platreef (11,35)
|
62.5%
|
-
|
-
|
-
|
7.9
|
0.26
|
0.07
|
7.9
|
0.26
|
0.07
|
15.8
|
0.26
|
0.13
|
|
Kone (11,39)
|
19.5%
|
-
|
-
|
-
|
3.5
|
0.40
|
0.05
|
3.5
|
0.40
|
0.05
|
1.4
|
0.50
|
0.02
|
|
Blackwater (11,27)
|
8%
|
4.1
|
0.35
|
0.05
|
6.4
|
0.49
|
0.10
|
10.5
|
0.44
|
0.15
|
0.7
|
0.45
|
0.01
|
|
Toroparu (12,16)
|
10%
|
4.2
|
1.45
|
0.198
|
7.3
|
1.46
|
0.34
|
11.5
|
1.45
|
0.54
|
2.1
|
1.71
|
0.12
|
|
Santo Domingo (11,25)
|
100%
|
1.4
|
0.05
|
0.002
|
120.1
|
0.03
|
0.11
|
121.5
|
0.03
|
0.12
|
31.8
|
0.02
|
0.03
|
|
Marathon (11,28)
|
100%
|
30.2
|
0.07
|
0.06
|
39.6
|
0.06
|
0.08
|
69.8
|
0.06
|
0.14
|
19.1
|
0.04
|
0.03
|
|
Copper World Complex (21)
|
100%
|
424.0
|
0.02
|
0.30
|
191.0
|
0.02
|
0.10
|
615.0
|
0.02
|
0.40
|
192.0
|
0.01
|
0.08
|
|
Curipamba (11,29)
|
50%
|
-
|
-
|
-
|
1.2
|
1.63
|
0.06
|
1.2
|
1.63
|
0.06
|
0.4
|
1.62
|
0.02
|
|
Goose (11,30)
|
2.78%
|
0.0
|
4.94
|
0.004
|
0.1
|
5.18
|
0.01
|
0.1
|
5.13
|
0.02
|
0.1
|
6.64
|
0.03
|
|
Kutcho (12)
|
100%
|
0.4
|
0.20
|
0.003
|
5.0
|
0.38
|
0.06
|
5.4
|
0.37
|
0.06
|
12.9
|
0.25
|
0.10
|
|
Fenix (11,26)
|
22%
|
2.4
|
0.34
|
0.03
|
8.5
|
0.34
|
0.09
|
10.9
|
0.34
|
0.12
|
3.2
|
0.33
|
0.03
|
|
Cotabambas (12,23)
|
25%
|
-
|
-
|
-
|
126.8
|
0.20
|
0.82
|
126.8
|
0.20
|
0.82
|
105.9
|
0.17
|
0.57
|
|
Curraghinalt (11,33)
|
3.05%
|
-
|
-
|
-
|
-
|
-
|
-
|
-
|
-
|
-
|
0.2
|
12.24
|
0.07
|
|
Mt Todd (11,36)
|
1%
|
0.0
|
1.15
|
0.0001
|
0.1
|
1.50
|
0.01
|
0.1
|
1.49
|
0.01
|
0.4
|
0.77
|
0.01
|
|
Kudz Ze Kayah (11,34)
|
7.27%
|
-
|
-
|
-
|
0.2
|
1.64
|
0.01
|
0.2
|
1.64
|
0.01
|
0.0
|
1.18
|
0.002
|
|
Brewery Creek Royalty (24)
|
2%
|
0.3
|
1.06
|
0.01
|
0.5
|
1.02
|
0.02
|
0.8
|
1.03
|
0.03
|
1.0
|
0.88
|
0.03
|
|
Metates Royalty (17)
|
1%
|
0.2
|
0.86
|
0.004
|
4.5
|
0.56
|
0.08
|
4.6
|
0.57
|
0.08
|
0.7
|
0.47
|
0.01
|
|
Black Pine Royalty (32)
|
0.5%
|
-
|
-
|
-
|
1.0
|
0.49
|
0.02
|
1.0
|
0.49
|
0.02
|
0.1
|
0.42
|
0.002
|
|
DeLamar (37)
|
1.5%
|
0.1
|
0.27
|
0.001
|
1.0
|
0.21
|
0.01
|
1.0
|
0.21
|
0.01
|
0.4
|
0.25
|
0.003
|
|
Total Gold
|
|
|
|
1.16
|
|
|
5.87
|
|
|
7.03
|
|
|
5.09
|
|
Silver
|
|
|
|
|
|
|
|||||||
|
Peñasquito (10)
|
25%
|
9.4
|
24.5
|
7.4
|
39.3
|
25.1
|
31.8
|
48.7
|
25.0
|
39.1
|
5.7
|
25.4
|
4.7
|
|
Constancia
|
100%
|
78.4
|
2.2
|
5.5
|
93.1
|
2.0
|
5.9
|
171.5
|
2.1
|
11.5
|
36.9
|
3.6
|
4.3
|
|
Antamina (10,11,18)
|
33.75%
|
|
|
|
|
|
|
||||||
|
Copper
|
61.8
|
8.0
|
15.9
|
99.0
|
9.0
|
28.6
|
160.8
|
8.6
|
44.5
|
192.2
|
9.0
|
55.6
|
|
|
Copper-Zinc
|
14.9
|
20.0
|
9.5
|
51.4
|
18.0
|
29.7
|
66.3
|
18.4
|
39.3
|
91.3
|
15.6
|
45.7
|
|
|
Zinkgruvan
|
100%
|
|
|
|
|
|
|
||||||
|
Zinc
|
3.5
|
61.4
|
6.9
|
4.2
|
63.5
|
8.6
|
7.7
|
62.5
|
15.5
|
15.7
|
91.3
|
46.1
|
|
|
Copper
|
1.9
|
33.4
|
2.0
|
0.3
|
12.2
|
0.1
|
2.2
|
30.6
|
2.1
|
0.2
|
28.9
|
0.2
|
|
|
Neves-Corvo
|
100%
|
|
|
|
|
|
|
||||||
|
Copper
|
5.1
|
48.5
|
8.0
|
28.9
|
50.4
|
46.9
|
34.0
|
50.2
|
54.8
|
14.0
|
28.3
|
12.8
|
|
|
Zinc
|
8.3
|
62.1
|
16.5
|
34.7
|
57.5
|
64.1
|
43.0
|
58.4
|
80.6
|
4.1
|
63.2
|
8.3
|
|
|
San Dimas (14)
|
25%
|
0.2
|
446.2
|
2.4
|
0.1
|
193.0
|
0.9
|
0.3
|
327.1
|
3.3
|
1.0
|
306.3
|
9.7
|
|
Aljustrel (19)
|
100%
|
7.4
|
56.6
|
13.4
|
10.3
|
45.5
|
15.1
|
17.7
|
50.2
|
28.5
|
12.2
|
40.8
|
16.0
|
|
Mineral Park
|
100%
|
22.6
|
2.1
|
1.5
|
261.5
|
2.0
|
16.9
|
284.1
|
2.0
|
18.4
|
341.2
|
1.5
|
16.2
|
|
Cozamin (11,20)
|
50%
|
|
|
|
|
|
|
||||||
|
Copper
|
0.2
|
53.8
|
0.3
|
3.3
|
40.7
|
4.3
|
3.5
|
41.4
|
4.6
|
2.2
|
41.8
|
3.0
|
|
|
Zinc
|
-
|
-
|
-
|
1.4
|
36.5
|
1.7
|
1.4
|
36.5
|
1.7
|
1.7
|
33.8
|
1.8
|
|
|
Marmato (11,15)
|
100%
|
0.7
|
25.3
|
0.6
|
16.3
|
6.0
|
3.1
|
17.0
|
6.8
|
3.7
|
17.8
|
3.2
|
1.8
|
|
Minto (38)
|
100%
|
-
|
-
|
-
|
11.1
|
4.7
|
1.7
|
11.1
|
4.7
|
1.7
|
13.0
|
4.5
|
1.9
|
|
Stratoni
|
100%
|
-
|
-
|
-
|
1.4
|
151.7
|
6.8
|
1.4
|
151.7
|
6.8
|
1.8
|
166.5
|
9.7
|
|
Copper World Complex (21)
|
100%
|
424.0
|
4.1
|
55.9
|
191.0
|
3.5
|
21.5
|
615.0
|
3.9
|
77.4
|
192.0
|
3.1
|
19.1
|
|
Blackwater (11,27)
|
50%
|
33.7
|
4.7
|
5.1
|
52.9
|
8.7
|
14.8
|
86.6
|
7.1
|
19.9
|
5.6
|
12.8
|
2.3
|
|
Kutcho (12)
|
100%
|
0.4
|
28.0
|
0.4
|
5.0
|
25.7
|
4.1
|
5.4
|
25.9
|
4.5
|
12.9
|
20.0
|
8.3
|
|
Curipamba (11,29)
|
75%
|
-
|
-
|
-
|
1.8
|
38.4
|
2.2
|
1.8
|
38.4
|
2.2
|
0.7
|
31.6
|
0.7
|
|
Pascua-Lama
|
25%
|
10.7
|
57.2
|
19.7
|
97.9
|
52.2
|
164.4
|
108.6
|
52.7
|
184.1
|
3.8
|
17.8
|
2.2
|
|
Loma de La Plata
|
12.5%
|
-
|
-
|
-
|
3.6
|
169.0
|
19.8
|
3.6
|
169.0
|
19.8
|
0.2
|
76.0
|
0.4
|
|
Toroparu (12,16)
|
50%
|
21.2
|
1.8
|
1.2
|
36.3
|
1.2
|
1.4
|
57.5
|
1.4
|
2.7
|
10.6
|
0.8
|
0.3
|
|
Cotabambas (12,23)
|
100.0%
|
-
|
-
|
-
|
507.3
|
2.4
|
39.5
|
507.3
|
2.4
|
39.5
|
423.6
|
2.5
|
34.5
|
|
Kudz Ze Kayah (11,34)
|
7.21%
|
-
|
-
|
-
|
0.2
|
186.4
|
1.4
|
0.2
|
186.4
|
1.4
|
0.0
|
143.4
|
0.2
|
|
Metates Royalty (17)
|
0.5%
|
0.2
|
18.2
|
0.1
|
4.5
|
14.2
|
2.0
|
4.6
|
14.3
|
2.1
|
0.7
|
13.2
|
0.3
|
|
DeLamar (37)
|
1.5%
|
0.1
|
12.9
|
0.03
|
1.0
|
10.0
|
0.3
|
1.0
|
10.2
|
0.3
|
0.4
|
8.4
|
0.1
|
|
Total Silver
|
|
|
|
172.4
|
|
|
537.7
|
|
|
710.0
|
|
|
306.1
|
|
Palladium
|
|
|
|
|
|
|
|||||||
|
Platreef (11,35)
|
5.25%
|
-
|
-
|
-
|
0.3
|
1.5
|
0.01
|
0.3
|
1.5
|
0.01
|
0.5
|
1.5
|
0.02
|
|
Stillwater (11,13)
|
4.5%
|
0.21
|
9.0
|
0.06
|
0.2
|
7.2
|
0.04
|
0.4
|
8.1
|
0.11
|
1.1
|
9.3
|
0.34
|
|
Total Palladium
|
|
|
|
0.06
|
|
|
0.06
|
|
|
0.12
|
|
|
0.36
|
|
Platinum
|
|
|
|
|
|
|
|||||||
|
Platreef (11,35)
|
5.25%
|
-
|
-
|
-
|
0.3
|
1.5
|
0.01
|
0.3
|
1.5
|
0.01
|
0.5
|
1.4
|
0.02
|
|
Marathon (11,28)
|
22%
|
7.14
|
0.2
|
0.04
|
9.4
|
0.1
|
0.04
|
16.5
|
0.1
|
0.08
|
4.3
|
0.1
|
0.01
|
|
Total Platinum
|
|
|
|
0.04
|
|
|
0.05
|
|
|
0.09
|
|
|
0.04
|
|
Cobalt
|
|
|
|
|
|
|
|||||||
|
Voisey's Bay (11,22)
|
42.4%
|
0.5
|
0.06
|
0.6
|
0.4
|
0.07
|
0.6
|
0.9
|
0.06
|
1.2
|
2.7
|
0.12
|
7.2
|
|
Total Cobalt
|
|
|
|
0.6
|
|
|
0.6
|
|
|
1.2
|
|
|
7.2
|
| 1. |
All Mineral Reserves and Mineral Resources have been estimated in accordance with the 2014 Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Standards for Mineral Resources and Mineral Reserves and National Instrument 43-101 –
Standards for Disclosure for Mineral Projects (“NI 43-101”), or the 2012 Australasian Joint Ore Reserves Committee (JORC) Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.
|
| 2. |
Mineral Reserves and Mineral Resources are reported above in millions of metric tonnes (“Mt”), grams per metric tonne (“g/t”) for gold, silver, palladium and platinum, percent (“%”) for cobalt, millions of ounces (“Moz”) for gold, silver,
palladium and platinum and millions of pounds (“Mlbs”) for cobalt.
|
| 3. |
Qualified persons (“QPs”), as defined by the NI 43-101, for the technical information contained in this document (including the Mineral Reserve and Mineral Resource estimates) are:
|
| a. |
Neil Burns, M.Sc., P.Geo. (Vice President, Technical Services); and
|
| b. |
Ryan Ulansky, M.A.Sc., P.Eng. (Vice President, Engineering),
|
| 4. |
The Mineral Resources reported in the above tables are exclusive of Mineral Reserves. The Aljustrel mines, Blackwater project, Cangrejos project, Cozamin mine, Curipamba project, Curraghinalt project, Fenix project, Goose project, Kudz Ze
Kayah project, Kutcho project, Marathon project, Neves-Corvo mine, Platreef project, San Dimas mine, Santo Domingo project and Zinkgruvan mine report Mineral Resources inclusive of Mineral Reserves. The Company’s QPs have made the exclusive
Mineral Resource estimates for these mines based on average mine recoveries and dilution.
|
| 5. |
Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability.
|
| 6. |
Other than as detailed below, Mineral Reserves and Mineral Resources are reported as of December 31, 2023 based on information available to the Company as of the date of this document, and therefore will not reflect updates, if any, after
such date.
|
| a. |
Mineral Resources for Aljustrel’s Feitais mine are reported as of July 2022, Moinho & St João mines as of June 2022 and the Estação project as of July 2018. Mineral Reserves for the Feitais, Moinho and St João mines are reported as of
December 2021 and the Estação project as of April 2022.
|
| b. |
Mineral Resources for the Black Pine project are reported as of February 15, 2024.
|
| c. |
Mineral Resources for the Blackwater project are reported as of May 5, 2020 and Mineral Reserves as of September 10, 2021.
|
| d. |
Mineral Resources for the Brewery Creek project are reported as of May 31, 2020.
|
| e. |
Mineral Resources for the Cangrejos project are reported as of January 30, 2023 and Mineral Reserves as of March 30, 2023.
|
| f. |
Mineral Resources and Mineral Reserves for the Copper World Complex project are reported as of July 1, 2023.
|
| g. |
Mineral Resources for the Cotabambas project are reported as of November 20, 2023.
|
| h. |
Mineral Resources for the Curipamba project are reported as of October 26, 2021 and Mineral Reserves as of October 22, 2021.
|
| i. |
Mineral Resources for the Curraghinalt project are reported as of May 10, 2018 and Mineral Reserves as of February 25, 2022.
|
| j. |
Mineral Resources for the DeLamar project are reported as of August 25, 2023 and Mineral Reserves as of January 24, 2022.
|
| k. |
Mineral Resources and Mineral Reserves for the Fenix project are reported as of October 16, 2023.
|
| l. |
Mineral Resources for the Goose project are reported as of December 31, 2020 and Mineral Reserves as of January 15, 2021.
|
| m. |
Mineral Resources for the Koné project are reported as of December 19, 2023 and Mineral Reserves as of January 15, 2024.
|
| n. |
Mineral Resources for the Kudz Ze Kayah project are reported as of May 31, 2017 and Mineral Reserves as of June 30, 2019.
|
| o. |
Mineral Resources for the Kutcho project are reported as of July 30, 2021 and Mineral Reserves are reported as of November 8, 2021.
|
| p. |
Mineral Resources for the Loma de La Plata project are reported as of May 20, 2009.
|
| q. |
Mineral Resources and Mineral Reserves for the Los Filos mine are reported as of June 30, 2022.
|
| r. |
Mineral Resources and Mineral Reserves for the Marathon project are reported as of December 31, 2022.
|
| s. |
Mineral Resources and Mineral Reserves for the Marmato mine are reported as of June 30, 2022.
|
| t. |
Mineral Resources for the Metates royalty are reported as of January 28, 2023.
|
| u. |
Mineral Resources for the Mineral Park project are reported as of October 30, 2021 and Mineral Reserves as of September 29, 2023.
|
| v. |
Mineral Resources for the Minto mine are reported as of March 31, 2021.
|
| w. |
Mineral Resources for the Platreef project are reported as of January 28, 2022 and Mineral Reserves as of January 26, 2022.
|
| x. |
Mineral Resources for the Santo Domingo project are reported as of February 13, 2020 and Mineral Reserves as of November 14, 2018.
|
| y. |
Mineral Resources and Mineral Reserves for the Stratoni mine are reported as of September 30, 2023.
|
| z. |
Mineral Resources for the Toroparu project are reported as of February 10, 2023.
|
| 7. |
Process recoveries are the Company’s estimated average percentage of gold, silver, palladium, platinum, or cobalt in a saleable product (doré or concentrate) recovered from mined ore at the applicable site process plants.
|
| 8. |
Mineral Reserves are estimated using appropriate process and mine recovery rates, dilution, operating costs and the following commodity prices:
|
| a. |
Aljustrel mine – 3.0% zinc cut-off for the Feitais, Moinho and St João mines and the Estação project.
|
| b. |
Antamina mine - $6,000 per hour of mill operation cut-off assuming $3.50 per pound copper, $1.10 per pound zinc, $11.10 per pound molybdenum and $21.50 per ounce silver.
|
| c. |
Blackwater project – NSR cut-off of Cdn$13.00 per tonne assuming $1,400 per ounce gold and $15.00 per ounce silver.
|
| d. |
Cangrejos project - declining NSR cut-offs of between $23.00 and $7.76 per tonne assuming $1,500 per ounce gold, $3.00 per pound copper and $18.00 per ounce silver.
|
| e. |
Constancia mine – NSR cut-off of $6.40 per tonne for Constancia and $7.30 per tonne for Pampacancha assuming $1,700 per ounce gold, $23.00 per ounce silver, $4.00 per pound copper and $12.00 per pound molybdenum.
|
| f. |
Copper World Complex project – $3.75 per pound copper, $12.00 per pound molybdenum, $22.00 per ounce silver and $1,650 per ounce gold.
|
| g. |
Cozamin mine - NSR cut-off of $60.54 per tonne for long-hole and $65.55 per tonne for cut and fill assuming $3.55 per pound copper, $20.00 per ounce silver, $0.90 per pound lead and $1.15 per pound zinc.
|
| h. |
Curraghinalt project - 3.0 grams per tonne gold cut-off assuming $1,200 per ounce gold.
|
| i. |
Curipamba project - NSR cut-off of $32.99 per tonne assuming $1,630 per ounce gold, $21.00 per ounce silver, $3.31 per pound copper, $0.92 per pound lead and $1.16 per pound zinc.
|
| j. |
DeLamar project – NSR cut-offs of $3.55 and $3.65 per tonne for Florida Mountain and DeLamar oxide leach and $4.20 and $4.65 per tonne for Florida Mountain and DeLamar mixed leach, all assuming $1,650 per ounce gold and $21.00 per ounce
silver.
|
| k. |
Fenix project – 0.235 grams per tonne gold cut-off assuming $1.650 per ounce gold.
|
| l. |
Goose project:
|
| i. |
Umwelt – 1.72 grams per tonne gold cut-off for open pit and 3.9 grams per tonne for underground.
|
| ii. |
Llama – 1.74 grams per tonne gold cut-off for open pit and 4.1 grams per tonne for underground.
|
| iii. |
Goose Main – 1.70 grams per tonne gold cut-off for open pit and 4.1 grams per tonne for underground.
|
| iv. |
Echo – 1.60 grams per tonne gold cut-off for open pit and 3.5 grams per tonne for underground.
|
| m. |
Koné project - gold grade cut-offs ranging from 0.19 to 0.49 grams per tonne assuming $1,550 per ounce gold.
|
| n. |
Kudz Ze Kayah project - NSR cut-off of Cdn$29.30 per tonne for open pit and Cdn$173.23 per tonne for underground assuming $1,310 per ounce gold, $18.42 per ounce silver, $3.08 per pound copper, $0.94 per pound lead and $1.10 per pound zinc.
|
| o. |
Kutcho project – NSR cut-offs of Cdn$38.40 per tonne for oxide ore and Cdn$55.00 per tonne for sulfide for the open pit and Cdn$129.45 per tonne for the underground assuming $3.50 per pound copper, $1.15 per pound zinc, $20.00 per ounce
silver and $1,600 per ounce gold.
|
| p. |
Los Filos mine – Variable breakeven cut-offs for the open pits depending on process destination and metallurgical recoveries and NSR cut-offs of $65.80 - $96.60 per tonne for the underground mines, assuming $1,450 per ounce gold and $18.00
per ounce silver.
|
| q. |
Marathon project - NSR cut-off of Cdn$16.00 per tonne assuming $1,500 per ounce palladium, $1,000 per ounce platinum, $3.50 per pound copper, $1,600 per ounce gold and $20.00 per ounce silver.
|
| r. |
Marmato mine – 2.05 grams per tonne gold cut-off for the Upper Mine and 1.62 grams per tonne gold cut-off for the Lower Mine, all assuming $1,500 per ounce gold.
|
| s. |
Mineral Park project - NSR cut-off of $10.50 per tonne assuming $2.81 per pound copper, $14.25 per pound molybdenum and $16.13 per ounce silver.
|
| t. |
Mt Todd project – 0.35 grams per tonne gold cut-off for the Batman deposit and zero cut-off for the Heap Leach, assuming $1,600 per ounce gold.
|
| u. |
Neves-Corvo mine – NSR cut-offs ranging from EUR 49 to 82 per tonne depending on area and mining method for both the copper and zinc Mineral Reserves assuming $3.65 per pound copper, $0.90 per pound lead and $1.15 per pound zinc.
|
| v. |
Peñasquito mine - $1,400 per ounce gold, $20.00 per ounce silver, $1.00 per pound lead and $1.20 per pound zinc.
|
| w. |
Platreef project - declining NSR cut-offs of between $155 and $80 per tonne assuming $1,600 per ounce platinum, $815 per ounce palladium, $1,300 per ounce gold, $1,500 per ounce rhodium, $8.90 per pound nickel and $3.00 per pound copper.
|
| x. |
Salobo mine – 0.25% copper equivalent cut-off assuming $1,525 per ounce gold and $3.52 per pound copper.
|
| y. |
San Dimas mine – $1,850 per ounce gold and $22.50 per ounce silver.
|
| z. |
Santo Domingo project - variable throughput rates and cut-offs assuming $3.00 per pound copper, $1,290 per ounce gold and $100 per tonne iron.
|
| aa. |
Stillwater mines - combined platinum and palladium cut-off of 6.86 grams per tonne for Stillwater and East Boulder sub-level extraction and 1.71 grams per tonne for Ramp & Fill at East Boulder assuming $1,500 per ounce 2E PGM prices.
|
| bb. |
Sudbury mines - $1,450 per ounce gold, $8.16 per pound nickel, $3.40 per pound copper, $1,200 per ounce platinum, $1,400 per ounce palladium and $22.68 per pound cobalt.
|
| cc. |
Voisey’s Bay mines – NSR cut-offs of Cdn$28.00 per tonne for Discovery Hill Open Pit, Cdn$230 to $250 per tonne for Reid Brook and Cdn$210 to $250 per tonne for Eastern Deeps all assuming $3.40 per pound copper, $8.16 per pound nickel and
$22.68 per pound cobalt.
|
| dd. |
Zinkgruvan mine – NSR cut-offs ranging from SEK 950 to 1,100 per tonne depending on area and mining method for both the copper and zinc Mineral Reserves assuming $3.65 per pound copper and $0.90 per pound lead and $1.15 per pound zinc.
|
| 9. |
Mineral Resources are estimated using appropriate recovery rates and the following commodity prices:
|
| a. |
Aljustrel mine – 3.0% zinc cut-off for Feitais, Moinho and St João mines and the Estação project.
|
| b. |
Antamina mine - $6,000 per hour of mill operation cut-off for the open pit and $53.80 per tonne NSR cut-off for the undergound, both assuming $3.50 per pound copper, $1.30 per pound zinc, $13.30 per pound molybdenum and $24.60 per ounce
silver.
|
| c. |
Black Pine – 0.2 grams per tonne gold cut-off assuming $1,800 per ounce gold.
|
| d. |
Blackwater project – 0.2 grams per tonne gold equivalent cut-off assuming $1,400 per ounce gold and $15.00 per ounce silver.
|
| e. |
Brewery Creek project – 0.37 grams per tonne gold cut-off assuming $1,500 per ounce gold.
|
| f. |
Cangrejos project - 0.25 grams per tonne gold equivalent cut-off assuming $1,600 per ounce gold, $3.50 per pound copper, $11.00 per pound molybdenum and $21.00 per ounce silver.
|
| g. |
Constancia mine – NSR cut-off of $6.40 per tonne for open pit and 0.65% copper cut-off for underground, both assuming $1,700 per ounce gold, $23.00 per ounce silver, $4.00 per pound copper and $12.00 per pound molybdenum.
|
| h. |
Copper World Complex project – 0.1% copper cut-off and an oxidation ratio of lower than 50%, assuming $3.75 per pound copper, $12.00 per pound molybdenum, $22.00 per ounce silver, and $1,650 per ounce gold.
|
| i. |
Cotabambas project – 0.15% copper equivalent cut-off assuming $1,850 per ounce gold, $23.00 per ounce silver, $4.25 per pound copper and $20.00 per pound molybdenum.
|
| j. |
Cozamin mine – NSR cut-off of $59.00 per tonne assuming $3.75 per pound copper, $22.00 per ounce silver, $1.00 per pound lead and $1.35 per pound zinc.
|
| k. |
Curraghinalt project – 5.0 grams per tonne gold cut-off assuming $1,200 per ounce gold.
|
| l. |
Curipamba project - NSR cut-off of $29.00 per tonne for the open pit and $105 per tonne for the underground assuming $1,800 per ounce gold, $24.00 per ounce silver, $4.00 per pound copper, $1.05 per pound lead and $1.30 per pound zinc.
|
| m. |
DeLamar project – 0.17 grams per tonne gold equivalent cut-off for oxide leach and mixed leach and 0.1 grams per tonne gold equivalent cut-off for stockpile, all assuming $1,800 per ounce gold and $21.00 per ounce
silver
|
| n. |
Fenix project – 0.15 grams per tonne gold cut-off assuming $1,800 per ounce gold.
|
| o. |
Goose project - 1.4 grams per tonne gold cut-off for open pit and 3.0 grams per tonne for underground for all deposits, assuming a gold price of $1,550 per ounce.
|
| p. |
Koné project - 0.2 grams per tonne gold cut-off for the Koné deposit and 0.5 grams per tonne for the Gbongogo deposit, both assuming a gold price of $1,800 per ounce.
|
| q. |
Kudz Ze Kayah project – NSR cut-off of Cdn$25 per tonne for open pit and Cdn$95 per tonne for underground assuming $1,300 per ounce gold, $20.00 per ounce silver, $3.50 per pound copper, $1.05 per pound lead and $1.50 per pound zinc.
|
| r. |
Kutcho project – 0.45% copper equivalent cut-off for the Main open pit and underground copper equivalent cut-offs of 1.05%, 0.95% and 1.05% for Main, Esso and Sumac respectively, all assuming $3.50 per pound copper, $1.15 per pound zinc,
$20.00 per ounce silver and $1,600 per ounce gold.
|
| s. |
Loma de La Plata project – 50 grams per tonne silver equivalent cut-off assuming $12.50 per ounce silver and $0.50 per pound lead.
|
| t. |
Los Filos mine – 0.2 grams per tonne gold cut-off for the open pits, 1.71 grams per tonne gold cut-off for Los Filos South underground, 2.05 grams per tonne gold cut-off for Los Filos North underground and 2.71 grams per tonne gold cut-off
for Bermejal underground, all assuming $1,550 per ounce gold and $18.00 per ounce silver.
|
| u. |
Marathon project – NSR cut-off of Cdn$15.00 per tonne for the Marathon project assuming $1,800 per ounce palladium, $1,000 per ounce platinum, $3.50 per pound copper, $1,600 per ounce gold and $20.00 per ounce silver. NSR cut-off of
Cdn$13.00 per tonne for the Sally and Geordie projects assuming $1,600 per ounce palladium, $900 per ounce platinum, $3.00 per pound copper, $1,500 per ounce gold and $18.00 per ounce silver.
|
| v. |
Marmato mine – 1.8 grams per tonne gold cut-off for the Upper Mine and 1.3 grams per tonne gold cut-off for the Lower Mine, all assuming $1,700 per ounce gold.
|
| w. |
Metates royalty – 0.26 grams per tonne gold equivalent cut-off assuming $1,600 per ounce gold and $20.00 per ounce silver.
|
| x. |
Mineral Park project - 0.15 percent copper equivalent cut-off assuming $3.45 per pound copper, $10.00 per pound molybdenum and $23.00 per ounce silver.
|
| y. |
Minto mine – NSR cut-off of Cdn$35.00 per tonne for open pit and Cdn$70 per tonne for underground, assuming $1,500 per ounce gold, $18.00 per ounce silver and $3.10 per pound copper.
|
| z. |
Mt Todd project – 0.4 grams per tonne gold cut-off for the Batman and Quigleys deposits and zero cut-off for Heap Leach, assuming $1,300 per ounce gold.
|
| aa. |
Neves-Corvo mine – 1.0% copper cut-off for the copper Mineral Resource and 4.5% zinc cut-off for the zinc Mineral Resource, both assuming $4.20 per pound copper, $0.90 per pound lead and $1.15 per pound zinc.
|
| bb. |
Pascua-Lama project – $1,700 per ounce gold, $21.00 per ounce silver and $3.75 per pound copper.
|
| cc. |
Peñasquito mine - $1,600 per ounce gold, $23.00 per ounce silver, $1.20 per pound lead and $1.45 per pound zinc.
|
| dd. |
Platreef project - 2.0 grams per tonne 3PE + Au (platinum, palladium, rhodium and gold) cut-off.
|
| ee. |
Salobo mine – 0.25% copper equivalent cut-off assuming $1,525 per ounce gold and $3.52 per pound copper.
|
| ff. |
San Dimas mine – 215 grams per tonne silver equivalent cut-off assuming $2,000 per ounce gold and $24.50 per ounce silver.
|
| gg. |
Santo Domingo project - 0.125% copper equivalent cut-off assuming $3.50 per pound copper, $1,300 per ounce gold and $99 per tonne iron.
|
| hh. |
Stillwater mines – combined platinum and palladium cut-off of 3.77 grams per tonne for Stillwater, 6.86 grams per tonne for East Boulder sub-level extraction and 1.71 grams per tonne for East Boulder Ramp & Fill assuming $1,500 per ounce
2E PGM prices.
|
| ii. |
Stratoni mine – NSR cut-off of $200 per tonne assuming $2.75 per pound copper, $0.91 per pound lead, $1.04 per pound zinc and $17.00 per ounce silver.
|
| jj. |
Sudbury mines - $1,200 to $1,373 per ounce gold, $6.07 to $8.16 per pound nickel, $2.38 to $3.18 per pound copper, $1,150 to $1,225 per ounce platinum, $750 to $1,093 per ounce palladium and $12.47 to $20.41 per pound cobalt.
|
| kk. |
Toroparu project – 0.50 grams per tonne gold cut-off for open pit and 1.5 grams per tonne for underground assuming $1,650 per ounce gold.
|
| ll. |
Voisey’s Bay mines – NSR cut-off of Cdn$28 per tonne for Discovery Hill Open Pit and Cdn$250 per tonne for Reid Brook and Discovery Hill Underground, all assuming $3.40 per pound copper, $8.16 per pound nickel and $22.68 per pound cobalt.
|
| mm. |
Zinkgruvan mine – NSR cut-offs ranging from SEK 740 to 920 per tonne depending on area and mining method for the zinc Mineral Resources and NSR cut-offs ranging from SEK 800 to 830 per tonne for the copper Mineral Resources assuming $4.20
per pound copper and $0.90 per pound lead and $1.15 per pound zinc.
|
| 10. |
The scientific and technical information in these tables regarding the Antamina, Peñasquito and Salobo mines was sourced by the Company from the following filed documents:
|
| a. |
Antamina – Teck Resources Annual Information Form filed on SEDAR on February 23, 2024.
|
| b. |
Peñasquito – Newmont’s December 31, 2023 Resources and Reserves press release dated February 22, 2024 and
|
| c. |
Salobo – Vale has filed a technical report summary for the Salobo Mine, which is available on Edgar at https://www.sec.gov/Archives/edgar/data/0000917851/000110465922040322/tm2210823d1_6k.htm.
|
| 11. |
The Company’s attributable Mineral Resources and Mineral Reserves for the Antamina silver interest, Cozamin silver interest, Marmato gold and silver interests, Santo Domingo gold interest, Blackwater gold and silver interests, Marathon gold
and platinum interests, Sudbury gold interest, Fenix gold interest, Goose gold interest, Curipamba gold and silver interests, Stillwater palladium interest, Cangrejos gold interest, Curraghinalt gold interest, Kudz Ze Kayah gold and silver
interests, Platreef gold, palladium and platinum interests, Mt Todd royalty, Koné gold interest and Voisey’s Bay cobalt interest have been constrained to the production expected for the various contracts.
|
| 12. |
The Company has the option in the Early Deposit agreements, to terminate the agreement following the delivery of a feasibility study or if feasibility study has not been delivered within a required time frame.
|
| 13. |
The Stillwater PMPA provides that effective July 1, 2018, Sibanye-Stillwater will deliver 100% of the gold production for the life of the mines and 4.5% of palladium production until 375,000 ounces are delivered, 2.25% of palladium
production until a further 175,000 ounces are delivered and 1.0% of the palladium production thereafter for the life of the mines. Attributable palladium Mineral Reserves and Mineral Resources have been calculated based upon the 4.5% / 2.25% /
1.0% production entitlements.
|
| a. |
Stillwater mine: Pd = (Pt + Pd) / (1/3.51 + 1) and Au = (Pd + Pt) x 0.0238
|
| b. |
East Boulder mine: Pd = (Pt + Pd) / (1/3.60 + 1) and Au = (Pd + Pt) x 0.0323
|
| 14. |
Under the terms of the San Dimas PMPA, the Company is entitled to an amount equal to 25% of the payable gold production plus an additional amount of gold equal to 25% of the payable silver production converted to gold at a fixed gold to
silver exchange ratio of 70:1 from the San Dimas mine. If the average gold to silver price ratio decreases to less than 50:1 or increases to more than 90:1 for a period of 6 months or more, then the “70” shall be revised to “50” or “90”, as the
case may be, until such time as the average gold to silver price ratio is between 50:1 to 90:1 for a period of 6 months or more in which event the “70” shall be reinstated.
|
| 15. |
The Marmato PMPA provides that Aris Gold Corp will deliver 10.5% of the gold production until 310,000 ounces are delivered and 5.25% of gold production thereafter, as well as 100% of the silver production until 2.15 million ounces are
delivered and 50% of silver production thereafter. Attributable reserves and resources have been calculated on the 10.5% / 5.25% basis for gold and 100% / 50% basis for silver.
|
| 16. |
Under the Company’s Toroparu Early Deposit Agreement, the Company will be entitled to purchase 10% of the gold production and 50% of the silver production from the Toroparu project for the life of mine.
|
| 17. |
The Company’s Metates Royalty entitles the Company to a 0.5% net smelter return royalty.
|
| 18. |
The Antamina PMPA provides that Glencore will deliver silver equal to 33.75% of the silver production until 140 million ounces are delivered and 22.5% of silver production thereafter. Attributable reserves and resources have been calculated
on the 33.75% / 22.5% basis.
|
| 19. |
The Company only has the rights to silver contained in concentrates containing less than 15% copper at the Aljustrel mine.
|
| 20. |
The new Cozamin PMPA provides that Capstone will deliver silver equal to 50% of the silver production until 10 million ounces are delivered and 33% thereafter for the life of the mine. Attributable reserves and resources have been
calculated on the 50% / 33% basis.
|
| 21. |
The Copper World Complex Mineral Resources and Mineral Reserves do not include the Leach material.
|
| 22. |
The Voisey’s Bay PMPA provides that Vale will deliver 42.4% of the cobalt production until 31 million pounds are delivered to the Company and 21.2% of cobalt production thereafter, for the life of the mine. Attributable reserves and
resources have been calculated on the 42.4% / 21.2% basis.
|
| 23. |
Under the Cotabambas Early Deposit Agreement, the Company will be entitled to purchase 100% of the silver production and 25% of the gold production from the Cotabambas project until 90 million silver equivalent ounces have been delivered, at
which point the stream will drop to 66.67% of silver production and 16.67% of gold production for the life of mine.
|
| 24. |
Under the Brewery Creek Royalty, the Company will be entitled to a 2.0% net smelter return royalty for the first 600,000 ounces of gold produced from the Brewery Creek project, above which the NSR will increase to 2.75%. Victoria Gold has
the right to repurchase 0.625% of the increased NSR by paying the Company Cdn$2.0 million. Attributable resources have been calculated on the 2.0% / 2.75% basis.
|
| 25. |
The Santo Domingo PMPA provides that Capstone will deliver gold equal to 100% of the gold production until 285,000 ounces are delivered and 67% thereafter for the life of the mine. Attributable reserves and resources have been calculated on
the 100% / 67% basis.
|
| 26. |
The Fenix PMPA provides that Rio2 will deliver gold equal to 22% of the gold production until 130,625 ounces are delivered, then 6% of the gold production until 185,000 ounces are delivered, then 4% of the gold production until 235,000
ounces are delivered and 3.5% thereafter for the life of the mine. Attributable reserves and resources have been calculated on this 22% / 6% / 4% / 3.5% basis.
|
| 27. |
The Blackwater Silver and Blackwater Gold PMPAs provide that Artemis will deliver respectively silver and gold equal to (i) 50% of the payable silver production until 17.8 million ounces are delivered and 33% thereafter for the life of the
mine, and (ii) 8% of the payable gold production until 464,000 ounces are delivered and 4% thereafter for the life of the mine. Attributable reserves and resources have been calculated on the 50% / 33% basis for silver and 8% / 4% basis for
gold.
|
| 28. |
The Marathon PMPA provides that Gen Mining will deliver 100% of the gold production until 150,000 ounces are delivered and 67% thereafter for the life of the mine and 22% of the platinum production until 120,000 ounces are delivered and 15%
thereafter for the life of the mine. Attributable reserves and resources have been calculated on the 100% / 67% basis for gold and 22% / 15% basis for platinum.
|
| 29. |
The Curipamba PMPA provides that Adventus will deliver silver and gold equal to 75% of the silver production until 4.6 million ounces are delivered and 50% thereafter for the life of the mine and 50% of the gold production until 150,000
ounces are delivered and 33% thereafter for the life of the mine. Attributable reserves and resources have been calculated on the 75% / 50% basis for silver and 50% / 33% basis for gold.
|
| 30. |
In connection with Sabina’s exercise of its option to repurchase 33% of the Goose gold stream on a change in control, the gold delivery obligations under the Goose PMPA with Sabina, a subsidiary of B2Gold, were reduced so that Sabina will
deliver gold equal to 2.78% of the gold production until 87,100 ounces are delivered, then 1.44% until 134,000 ounces are delivered and 1.0% thereafter for the life of the mine. Attributable reserves and resources have been calculated on the
2.78% / 1.44% / 1.0% basis.
|
| 31. |
The Cangrejos PMPA provides that Lumina will deliver gold equal to 6.6% of the gold production until 0.7 million ounces are delivered and 4.4% thereafter for the life of the mine. Attributable reserves and resources have been calculated on
the 6.6% / 4.4% basis.
|
| 32. |
The Black Pine Royalty provides that the Company will be entitled to a 0.5% net smelter return. Attributable resources have been calculated on the 0.5% basis.
|
| 33. |
The Curraghinalt PMPA provides that Dalradian will deliver gold equal to 3.05% of the payable gold production until 125,000 ounces of gold are delivered and 1.5% thereafter for the life of the mine. Attributable gold reserves and resources
have been calculated on the 3.05% / 1.5% basis.
|
| 34. |
The Kudz Ze Kayah PMPA provides that BMC will deliver gold and silver equal to 7.375% of the metal contained in concentrates until 24,338 ounces of gold and 3,193,375 ounces of silver are delivered, then 6.125% until 28,000 ounces of gold
and 3,680,803 ounces of silver are delivered, then 5.5% until 42,861 ounces of gold and 5,624,613 ounces of silver are delivered and 6.75% thereafter for the life of the mine. Attributable gold and silver reserves and resources have been
calculated on the 7.375% / 6.125% / 5.5% / 6.75% basis.
|
| 35. |
The Platreef Gold PMPA provides that Ivanhoe will deliver gold equal to 62.5% of the payable gold production until 218,750 ounces of gold are delivered and 50% until 428,300 ounces of gold are delivered, then 3.125% thereafter for a tail
period which will terminate on certain conditions being met. The Platreef Palladium and Platinum PMPA provides that Ivanhoe will deliver 5.25% of the platinum and palladium until 350,000 ounces are delivered and 3.0% until 485,115 ounces are
delivered, then 0.1% for a tail period which will terminate on certain conditions being met. Attributable gold reserves and resources have been calculated on the 62.5% / 50% / 3.125% basis and attributable platinum and palladium on the 5.25% /
3.0% / 0.1% basis.
|
| 36. |
The Mt Todd Royalty provides that the Company will be entitled to 1.0% of gross revenue until 3.47 million ounces of gold are delivered to an offtaker, then 0.667% of gross revenue for the life of the mine. Attributable gold reserves and
resources have been calculated on the 1.0% / 0.667% basis.
|
| 37. |
The DeLamar Royalty provides that the Company will be entitled to a 1.5% net smelter return. Attributable resources and reserves have been calculated on the 1.5% basis.
|
| 38. |
On May 13, 2023, Minto announced the suspension of operations at the Minto mine.
|
| 39. |
The Koné PMPA provides that Montage will deliver gold equal to 19.5% of the payable gold production until 400,000 ounces of gold are delivered, then 10.8% until 530,000 ounces are delivered and 5.4% thereafter for the life of the mine.
Attributable reserves and resources have been calculated on the 19.5% / 10.8% / 5.4% basis.
|
| 40. |
Precious metals and cobalt are by-product metals at all of the Mining Operations, other than gold at the Marmato mine, Toroparu project, Fenix project, Goose project, Blackwater project, Black Pine project, Curraghinalt project, Mt Todd
project, DeLamar project and Koné project, silver at the Loma de La Plata zone of the Navidad project and palladium at the Stillwater mines and Platreef project, and therefore, the economic cut off applied to the reporting of precious metals
and cobalt reserves and resources will be influenced by changes in the commodity prices of other metals at the mines.
|
| • |
payment by the Company of $625 million to Montage and the satisfaction of each party's obligations in accordance with the Koné Gold PMPA;
|
| • |
the receipt by the Company of gold production in respect of the Koné Gold Project;
|
| • |
the advance by the Company, and the repayment by Montage, of up to $75 million to Montage in connection with the Facility;
|
| • |
payment by the Company of $125 million to Rio2 and the satisfaction of each party's obligations in accordance with the Fenix PMPA (as amended);
|
| • |
the receipt by the Company of gold production in respect of the Fenix Gold Project;
|
| • |
the advance by the Company, and the repayment by Rio2, of up to $20 million to Rio2 in connection with the Rio2 standby loan facility;
|
| • |
the future price of commodities;
|
| • |
the estimation of future production from Mining Operations (including in the estimation of production, mill throughput, grades, recoveries and exploration potential);
|
| • |
the estimation of mineral reserves and mineral resources (including the estimation of reserve conversion rates and the realization of such estimations);
|
| • |
the commencement, timing and achievement of construction, expansion or improvement projects by Wheaton’s PMPA counterparties at Mining Operations;
|
| • |
the payment of upfront cash consideration to counterparties under PMPAs, the satisfaction of each party's obligations in accordance with PMPAs and the receipt by the Company of precious metals and cobalt production
in respect of the applicable Mining Operations under PMPAs or other payments under royalty arrangements;
|
| • |
the ability of Wheaton’s PMPA counterparties to comply with the terms of a PMPA (including as a result of the business, mining operations and performance of Wheaton’s PMPA counterparties) and the potential impacts of
such on Wheaton;
|
| • |
future payments by the Company in accordance with PMPAs, including any acceleration of payments;
|
| • |
the costs of future production;
|
| • |
the estimation of produced but not yet delivered ounces;
|
| • |
the future sales of Common Shares under, the amount of net proceeds from, and the use of the net proceeds from, the ATM Program;
|
| • |
continued listing of the Common Shares on the LSE, NYSE and TSX;
|
| • |
any statements as to future dividends;
|
| • |
the ability to fund outstanding commitments and the ability to continue to acquire accretive PMPAs;
|
| • |
projected increases to Wheaton's production and cash flow profile;
|
| • |
projected changes to Wheaton’s production mix;
|
| • |
the ability of Wheaton’s PMPA counterparties to comply with the terms of any other obligations under agreements with the Company;
|
| • |
the ability to sell precious metals and cobalt production;
|
| • |
confidence in the Company’s business structure;
|
| • |
the Company's assessment of taxes payable, including taxes payable under the GMT and the impact of the CRA Settlement, and the Company’s ability to pay its taxes;
|
| • |
possible CRA domestic audits for taxation years subsequent to 2016 and international audits;
|
| • |
the Company’s assessment of the impact of any tax reassessments;
|
| • |
the Company’s intention to file future tax returns in a manner consistent with the CRA Settlement;
|
| • |
the Company’s climate change and environmental commitments; and
|
| • |
assessments of the impact and resolution of various legal and tax matters, including but not limited to audits.
|
| • |
risks relating to the satisfaction of each party's obligations in accordance with the terms of the Koné Gold PMPA;
|
| • |
risks relating to the satisfaction of each party’s obligations in accordance with the terms of the Facility;
|
| • |
risks relating to the satisfaction of each party's obligations in accordance with the terms of the Fenix PMPA;
|
| • |
risks relating to the satisfaction of each party’s obligations in accordance with the terms of the Rio2 standby loan facility;
|
| • |
risks associated with fluctuations in the price of commodities (including Wheaton’s ability to sell its precious metals or cobalt production at acceptable prices or at all);
|
| • |
risks related to the Mining Operations (including fluctuations in the price of the primary or other commodities mined at such operations, regulatory, political and other risks of the jurisdictions in which the Mining
Operations are located, actual results of mining, risks associated with exploration, development, operating, expansion and improvement at the Mining Operations, environmental and economic risks of the Mining Operations, and changes in project
parameters as Mining Operations plans continue to be refined);
|
| • |
absence of control over the Mining Operations and having to rely on the accuracy of the public disclosure and other information Wheaton receives from the owners and operators of the Mining Operations as the basis for
its analyses, forecasts and assessments relating to its own business;
|
| • |
risks related to the uncertainty in the accuracy of mineral reserve and mineral resource estimation;
|
| • |
risks related to the satisfaction of each party’s obligations in accordance with the terms of the Company’s PMPAs, including the ability of the companies with which the Company has PMPAs to perform their obligations
under those PMPAs in the event of a material adverse effect on the results of operations, financial condition, cash flows or business of such companies, any acceleration of payments, estimated throughput and exploration potential;
|
| • |
risks relating to production estimates from Mining Operations, including anticipated timing of the commencement of production by certain Mining Operations;
|
| • |
Wheaton’s interpretation of, or compliance with, or application of, tax laws and regulations or accounting policies and rules, being found to be incorrect, the tax impact to the Company’s business operations being
materially different than currently contemplated, or the ability to pay such taxes as and when due;
|
| • |
any challenge or reassessment by the CRA of the Company’s tax filings being successful and the potential negative impact to the Company’s previous and future tax filings;
|
| • |
risks in assessing the impact of the CRA Settlement (including whether there will be any material change in the Company's facts or change in law or jurisprudence);
|
| • |
risks related to any potential amendments to Canada’s transfer pricing rules under the Income Tax Act (Canada) that may result from the Department of Finance’s consultation paper released June 6, 2023;
|
| • |
risks relating to Wheaton’s interpretation of, compliance with, or application of the GMT, including Canada’s GMTA, and the legislation enacted in Luxembourg, that applies to the income of the Company’s subsidiaries
for fiscal years beginning on or after December 31, 2023;
|
| • |
counterparty credit and liquidity risks;
|
| • |
mine operator and counterparty concentration risks;
|
| • |
indebtedness and guarantees risks;
|
| • |
hedging risk;
|
| • |
competition in the streaming industry risk;
|
| • |
risks relating to security over underlying assets;
|
| • |
risks relating to third-party PMPAs;
|
| • |
risks relating to revenue from royalty interests;
|
| • |
risks related to Wheaton’s acquisition strategy;
|
| • |
risks relating to third-party rights under PMPAs;
|
| • |
risks relating to future financings and security issuances;
|
| • |
risks relating to unknown defects and impairments;
|
| • |
risks related to governmental regulations;
|
| • |
risks related to international operations of Wheaton and the Mining Operations;
|
| • |
risks relating to exploration, development, operating, expansions and improvements at the Mining Operations;
|
| • |
risks related to environmental regulations;
|
| • |
the ability of Wheaton and the Mining Operations to obtain and maintain necessary licenses, permits, approvals and rulings;
|
| • |
the ability of Wheaton and the Mining Operations to comply with applicable laws, regulations and permitting requirements;
|
| • |
lack of suitable supplies, infrastructure and employees to support the Mining Operations;
|
| • |
risks related to underinsured Mining Operations;
|
| • |
inability to replace and expand mineral reserves, including anticipated timing of the commencement of production by certain Mining Operations (including increases in production, estimated grades and recoveries);
|
| • |
uncertainties related to title and indigenous rights with respect to the mineral properties of the Mining Operations;
|
| • |
the ability of Wheaton and the Mining Operations to obtain adequate financing;
|
| • |
the ability of the Mining Operations to complete permitting, construction, development and expansion;
|
| • |
challenges related to global financial conditions;
|
| • |
risks associated with environmental, social and governance matters;
|
| • |
risks related to fluctuations in commodity prices of metals produced from the Mining Operations other than precious metals or cobalt;
|
| • |
risks related to claims and legal proceedings against Wheaton or the Mining Operations;
|
| • |
risks related to the market price of the Common Shares of Wheaton;
|
| • |
the ability of Wheaton and the Mining Operations to retain key management employees or procure the services of skilled and experienced personnel;
|
| • |
risks related to interest rates;
|
| • |
risks related to the declaration, timing and payment of dividends;
|
| • |
risks related to access to confidential information regarding Mining Operations;
|
| • |
risks associated with multiple listings of the Common Shares on the LSE, NYSE and TSX;
|
| • |
risks associated with a possible suspension of trading of Common Shares;
|
| • |
risks associated with the sale of Common Shares under the ATM Program, including the amount of any net proceeds from such offering of Common Shares and the use of any such proceeds;
|
| • |
equity price risks related to Wheaton’s holding of long‑term investments in other companies;
|
| • |
risks relating to activist shareholders;
|
| • |
risks relating to reputational damage;
|
| • |
risks relating to expression of views by industry analysts;
|
| • |
risks related to the impacts of climate change and the transition to a low-carbon economy;
|
| • |
risks associated with the ability to achieve climate change and environmental commitments at Wheaton and at the Mining Operations;
|
| • |
risks related to ensuring the security and safety of information systems, including cyber security risks;
|
| • |
risks relating to generative artificial intelligence;
|
| • |
risks relating to compliance with anti-corruption and anti-bribery laws;
|
| • |
risks relating to corporate governance and public disclosure compliance;
|
| • |
risks of significant impacts on Wheaton or the Mining Operations as a result of an epidemic or pandemic;
|
| • |
risks related to the adequacy of internal control over financial reporting;
|
| • |
other risks discussed in the section entitled “Description of the Business – Risk Factors” in Wheaton’s most recent Annual Information Form available on SEDAR+ at www.sedarplus.ca, and in Wheaton’s Form 40-F and Form
6-Ks, all on file with the U.S. Securities and Exchange Commission in Washington, D.C. and available on EDGAR (the "Disclosure”).
|
| • |
the payment of $625 million to Montage and the satisfaction of each party's obligations in accordance with the terms of the Koné Gold PMPA;
|
| • |
the advance by the Company of up to $75 million to Montage in connection with the Facility and the receipt by the Company of all amounts owing under the Facility, including, but not limited to, interest;
|
| • |
the payment of $125 million to Rio2 and the satisfaction of each party's obligations in accordance with the terms of the Fenix PMPA;
|
| • |
the advance by the Company of up to $20 million to Rio2 in connection with the Rio2 standby loan facility and the receipt by WPMI of all amounts owing under the Rio2 standby loan facility, including, but not limited
to, interest;
|
| • |
that there will be no material adverse change in the market price of commodities;
|
| • |
that the Mining Operations will continue to operate and the mining projects will be completed in accordance with public statements and achieve their stated production estimates;
|
| • |
that the mineral reserves and mineral resource estimates from Mining Operations (including reserve conversion rates) are accurate;
|
| • |
that public disclosure and other information Wheaton receives from the owners and operators of the Mining Operations is accurate and complete;
|
| • |
that the production estimates from Mining Operations are accurate;
|
| • |
that each party will satisfy their obligations in accordance with the PMPAs;
|
| • |
that Wheaton will continue to be able to fund or obtain funding for outstanding commitments;
|
| • |
that Wheaton will be able to source and obtain accretive PMPAs;
|
| • |
that the terms and conditions of a PMPA are sufficient to recover liabilities owed to the Company;
|
| • |
that Wheaton has fully considered the value and impact of any third-party interests in PMPAs;
|
| • |
that expectations regarding the resolution of legal and tax matters will be achieved (including CRA audits involving the Company);
|
| • |
that Wheaton has properly considered the application of Canadian tax laws to its structure and operations and that Wheaton will be able to pay taxes when due;
|
| • |
that Wheaton has filed its tax returns and paid applicable taxes in compliance with Canadian tax laws;
|
| • |
that Wheaton's application of the CRA Settlement is accurate (including the Company's assessment that there has been no material change in the Company's facts or change in law or jurisprudence);
|
| • |
that Wheaton’s assessment of the tax exposure and impact on the Company and its subsidiaries of the GMT is accurate;
|
| • |
that any sale of Common Shares under the ATM Program will not have a significant impact on the market price of the Common Shares and that the net proceeds of sales of Common Shares, if any, will be used as
anticipated;
|
| • |
that the trading of the Common Shares will not be adversely affected by the differences in liquidity, settlement and clearing systems as a result of multiple listings of the Common Shares on the LSE, the TSX and the
NYSE;
|
| • |
that the trading of the Company’s Common Shares will not be suspended;
|
| • |
the estimate of the recoverable amount for any PMPA with an indicator of impairment;
|
| • |
that neither Wheaton nor the Mining Operations will suffer significant impacts as a result of an epidemic or pandemic; and
|
| • |
such other assumptions and factors as set out in the Disclosure.
|


|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
||||||||
|
(US dollars and shares in thousands, except per share amounts - unaudited)
|
Note
|
2024
|
2023
|
2024
|
2023
|
||||
|
Sales
|
6
|
$
|
308,253
|
$
|
223,137
|
$
|
904,123
|
$
|
702,573
|
|
Cost of sales
|
|
|
|
|
|||||
|
Cost of sales, excluding depletion
|
$
|
55,310
|
$
|
49,808
|
$
|
170,872
|
$
|
160,413
|
|
|
Depletion
|
|
|
55,530
|
|
46,435
|
|
178,071
|
|
145,908
|
|
Total cost of sales
|
|
$
|
110,840
|
$
|
96,243
|
$
|
348,943
|
$
|
306,321
|
|
Gross margin
|
|
$
|
197,413
|
$
|
126,894
|
$
|
555,180
|
$
|
396,252
|
|
General and administrative expenses
|
7
|
|
9,488
|
8,606
|
|
30,193
|
28,922
|
||
|
Share based compensation
|
8
|
|
9,628
|
4,336
|
|
17,150
|
16,217
|
||
|
Donations and community investments
|
9
|
|
2,352
|
|
1,736
|
|
4,626
|
|
5,054
|
|
Earnings from operations
|
$
|
175,945
|
$
|
112,216
|
$
|
503,211
|
$
|
346,059
|
|
|
Gain on disposal of mineral stream interests
|
12
|
|
-
|
-
|
|
-
|
5,027
|
||
|
Other income (expense)
|
10
|
|
7,605
|
|
10,707
|
|
19,922
|
|
26,961
|
|
Earnings before finance costs and income taxes
|
$
|
183,550
|
$
|
122,923
|
$
|
523,133
|
$
|
378,047
|
|
|
Finance costs
|
16.3
|
|
1,404
|
|
1,407
|
|
4,144
|
|
4,138
|
|
Earnings before income taxes
|
$
|
182,146
|
$
|
121,516
|
$
|
518,989
|
$
|
373,909
|
|
|
Income tax expense
|
22
|
|
27,511
|
|
5,145
|
|
77,996
|
|
4,700
|
|
Net earnings
|
|
$
|
154,635
|
$
|
116,371
|
$
|
440,993
|
$
|
369,209
|
|
Basic earnings per share
|
$
|
0.341
|
$
|
0.257
|
$
|
0.973
|
$
|
0.815
|
|
|
Diluted earnings per share
|
$
|
0.340
|
$
|
0.257
|
$
|
0.971
|
$
|
0.814
|
|
|
Weighted average number of shares outstanding
|
|
|
|
|
|||||
|
Basic
|
20
|
|
453,641
|
452,975
|
|
453,389
|
452,748
|
||
|
Diluted
|
20
|
|
454,302
|
|
453,538
|
|
454,037
|
|
453,419
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
||||||||
|
(US dollars in thousands - unaudited)
|
Note
|
2024
|
2023
|
2024
|
2023
|
||||
|
Net earnings
|
|
$
|
154,635
|
$
|
116,371
|
$
|
440,993
|
$
|
369,209
|
|
Other comprehensive income
|
|
|
|
|
|||||
|
Items that will not be reclassified to net earnings
|
|
|
|
|
|||||
|
Gain (loss) on LTIs¹
|
15
|
$
|
13,747
|
$
|
(59,504)
|
$
|
26,587
|
$
|
(67,933)
|
|
Income tax (recovery) expense related to LTIs
|
22
|
|
653
|
|
(5,115)
|
|
2,077
|
|
(7,205)
|
|
Total other comprehensive income (loss)
|
|
$
|
13,094
|
$
|
(54,389)
|
$
|
24,510
|
$
|
(60,728)
|
|
Total comprehensive income
|
|
$
|
167,729
|
$
|
61,982
|
$
|
465,503
|
$
|
308,481
|
| 1) |
LTIs = long-term investments – common shares held.
|
|
Note
|
As at
September 30 |
As at
December 31 |
|||
|
(US dollars in thousands - unaudited)
|
2024
|
2023
|
|||
|
Assets
|
|
|
|||
|
Current assets
|
|
|
|||
|
Cash and cash equivalents
|
21
|
$
|
694,085
|
$
|
546,527
|
|
Accounts receivable
|
11
|
|
10,435
|
10,078
|
|
|
Cobalt inventory
|
|
-
|
1,372
|
||
|
Income taxes receivable
|
22
|
|
1,392
|
5,935
|
|
|
Other
|
23
|
|
3,938
|
|
3,499
|
|
Total current assets
|
|
$
|
709,850
|
$
|
567,411
|
|
Non-current assets
|
|
|
|||
|
Mineral stream interests
|
12
|
$
|
6,456,123
|
$
|
6,122,441
|
|
Early deposit mineral stream interests
|
13
|
|
47,094
|
47,093
|
|
|
Mineral royalty interests
|
14
|
|
40,429
|
13,454
|
|
|
Long-term equity investments
|
15
|
|
103,068
|
246,678
|
|
|
Property, plant and equipment
|
|
7,535
|
7,638
|
||
|
Other
|
24
|
|
22,080
|
|
26,470
|
|
Total non-current assets
|
|
$
|
6,676,329
|
$
|
6,463,774
|
|
Total assets
|
|
$
|
7,386,179
|
$
|
7,031,185
|
|
Liabilities
|
|
|
|||
|
Current liabilities
|
|
|
|||
|
Accounts payable and accrued liabilities
|
$
|
14,766
|
$
|
13,458
|
|
|
Current portion of performance share units
|
19.1
|
|
12,522
|
12,013
|
|
|
Current portion of lease liabilities
|
16.2
|
|
324
|
|
604
|
|
Total current liabilities
|
|
$
|
27,612
|
$
|
26,075
|
|
Non-current liabilities
|
|
|
|||
|
Performance share units
|
19.1
|
$
|
9,301
|
$
|
9,113
|
|
Lease liabilities
|
16.2
|
|
5,340
|
5,625
|
|
|
Global minimum tax
|
22
|
|
78,361
|
-
|
|
|
Deferred income taxes
|
22
|
|
264
|
232
|
|
|
Pension liability
|
|
|
5,287
|
|
4,624
|
|
Total non-current liabilities
|
|
$
|
98,553
|
$
|
19,594
|
|
Total liabilities
|
|
$
|
126,165
|
$
|
45,669
|
|
Shareholders' equity
|
|
|
|||
|
Issued capital
|
17
|
$
|
3,797,558
|
$
|
3,777,323
|
|
Reserves
|
18
|
|
(44,489)
|
(40,091)
|
|
|
Retained earnings
|
|
|
3,506,945
|
|
3,248,284
|
|
Total shareholders' equity
|
|
$
|
7,260,014
|
$
|
6,985,516
|
|
Total liabilities and shareholders' equity
|
|
$
|
7,386,179
|
$
|
7,031,185
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
||||||||
|
(US dollars in thousands - unaudited)
|
Note
|
2024
|
2023
|
2024
|
2023
|
||||
|
Operating activities
|
|
|
|
|
|||||
|
Net earnings
|
$
|
154,635
|
$
|
116,371
|
$
|
440,993
|
$
|
369,209
|
|
|
Adjustments for
|
|
|
|
|
|||||
|
Depreciation and depletion
|
|
55,887
|
46,784
|
|
179,111
|
147,031
|
|||
|
Gain on disposal of mineral stream interest
|
12
|
|
-
|
-
|
|
-
|
(5,027)
|
||
|
Interest expense
|
16.3
|
|
71
|
78
|
|
216
|
131
|
||
|
Equity settled share based compensation
|
8
|
|
1,725
|
1,732
|
|
4,978
|
5,133
|
||
|
Performance share units - expense
|
19.1
|
|
7,903
|
2,604
|
|
12,172
|
11,084
|
||
|
Performance share units - paid
|
19.1
|
|
-
|
-
|
|
(11,129)
|
(16,675)
|
||
|
Pension expense
|
|
336
|
329
|
|
794
|
787
|
|||
|
Pension paid
|
|
-
|
-
|
|
(43)
|
(116)
|
|||
|
Income tax (recovery) expense
|
22
|
|
27,511
|
5,145
|
|
77,996
|
4,700
|
||
|
(Gain) loss on fair value adjustment of share purchase warrants held
|
10
|
|
(523)
|
143
|
|
(903)
|
248
|
||
|
Investment income recognized in net earnings
|
|
(7,249)
|
(10,537)
|
|
(18,564)
|
(26,564)
|
|||
|
Other
|
|
2,246
|
163
|
|
2,646
|
662
|
|||
|
Change in non-cash working capital
|
21
|
|
2,837
|
|
(489)
|
|
1,329
|
|
(876)
|
|
Cash generated from operations before income taxes and interest
|
$
|
245,379
|
$
|
162,323
|
$
|
689,596
|
$
|
489,727
|
|
|
Income taxes paid
|
|
2,925
|
(912)
|
|
2,734
|
(5,244)
|
|||
|
Interest paid
|
|
(71)
|
(79)
|
|
(219)
|
(112)
|
|||
|
Interest received
|
|
|
6,104
|
|
9,771
|
|
15,999
|
|
24,213
|
|
Cash generated from operating activities
|
$
|
254,337
|
$
|
171,103
|
$
|
708,110
|
$
|
508,584
|
|
|
Financing activities
|
|
|
|
|
|||||
|
Credit facility extension fees
|
16.1
|
$
|
(11)
|
$
|
(13)
|
$
|
(936)
|
$
|
(859)
|
|
Share purchase options exercised
|
18.1
|
|
847
|
93
|
|
13,011
|
10,603
|
||
|
Lease payments
|
16.2
|
|
(149)
|
(169)
|
|
(444)
|
(548)
|
||
|
Dividends paid
|
17.2
|
|
(69,984)
|
|
(66,994)
|
|
(209,108)
|
|
(198,085)
|
|
Cash used for financing activities
|
$
|
(69,297)
|
$
|
(67,083)
|
$
|
(197,477)
|
$
|
(188,889)
|
|
|
Investing activities
|
|
|
|
|
|||||
|
Mineral stream interests
|
12
|
$
|
(25,876)
|
$
|
(90,710)
|
$
|
(512,383)
|
$
|
(210,944)
|
|
Early deposit mineral stream interests
|
13
|
|
-
|
(250)
|
|
-
|
(1,000)
|
||
|
Mineral royalty interest
|
14
|
|
(4,956)
|
(3,602)
|
|
(26,981)
|
(3,602)
|
||
|
Net proceeds on disposal of mineral stream interests
|
|
-
|
-
|
|
-
|
46,400
|
|||
|
Acquisition of long-term investments
|
15, 21
|
|
(728)
|
(5,006)
|
|
(1,479)
|
(13,181)
|
||
|
Proceeds on disposal of long-term investments
|
15, 21
|
|
-
|
-
|
|
177,088
|
202
|
||
|
Dividends received
|
|
482
|
700
|
|
1,663
|
1,617
|
|||
|
Other
|
|
|
(155)
|
|
(35)
|
|
(944)
|
|
(1,804)
|
|
Cash used for investing activities
|
$
|
(31,233)
|
$
|
(98,903)
|
$
|
(363,036)
|
$
|
(182,312)
|
|
|
Effect of exchange rate changes on cash and cash equivalents
|
$
|
61
|
$
|
(35)
|
$
|
(39)
|
$
|
447
|
|
|
Increase in cash and cash equivalents
|
$
|
153,868
|
$
|
5,082
|
$
|
147,558
|
$
|
137,830
|
|
|
Cash and cash equivalents, beginning of period
|
|
540,217
|
|
828,837
|
|
546,527
|
|
696,089
|
|
|
Cash and cash equivalents, end of period
|
21
|
$
|
694,085
|
$
|
833,919
|
$
|
694,085
|
$
|
833,919
|
|
|
|
Reserves
|
|
|
|
|
|||||||||||
|
(US dollars in thousands - unaudited)
|
Number of Shares (000's)
|
Issued
Capital |
Share Purchase Warrants Reserve
|
Share Purchase Options Reserve
|
Restricted Share Units Reserve
|
LTI 1 Revaluation Reserve
(Net of Tax) |
Total
Reserves |
Retained Earnings
|
Total
|
||||||||
|
At January 1, 2023
|
452,319
|
$
|
3,752,662
|
$
|
83,077
|
$
|
22,578
|
$
|
8,142
|
$
|
(47,250)
|
$
|
66,547
|
$
|
2,898,466
|
$
|
6,717,675
|
|
Total comprehensive income
|
|
|
|
|
|
|
|
|
|
||||||||
|
Net earnings
|
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
252,839
|
$
|
252,839
|
|
OCI 1
|
|
|
-
|
|
-
|
|
-
|
|
-
|
|
(6,339)
|
|
(6,339)
|
|
-
|
|
(6,339)
|
|
Total comprehensive income
|
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
(6,339)
|
$
|
(6,339)
|
$
|
252,839
|
$
|
246,500
|
|
SBC 1 expense
|
|
$
|
-
|
$
|
-
|
$
|
1,355
|
$
|
2,046
|
$
|
-
|
$
|
3,401
|
$
|
-
|
$
|
3,401
|
|
Options 1 exercised
|
431
|
|
11,841
|
-
|
(1,914)
|
-
|
-
|
|
(1,914)
|
|
-
|
|
9,927
|
||||
|
RSUs 1 released
|
119
|
|
3,966
|
-
|
-
|
(3,966)
|
-
|
|
(3,966)
|
|
-
|
|
-
|
||||
|
Warrant expiration
|
-
|
|
-
|
(83,077)
|
-
|
-
|
-
|
|
(83,077)
|
|
83,077
|
|
-
|
||||
|
Dividends (Note 17.2)
|
100
|
|
4,758
|
-
|
-
|
-
|
-
|
|
-
|
|
(135,848)
|
|
(131,090)
|
||||
|
Realized loss on disposal of LTIs ¹ (Note 18.3)
|
|
|
-
|
|
-
|
|
-
|
|
-
|
|
(841)
|
|
(841)
|
|
841
|
|
-
|
|
At June 30, 2023
|
452,969
|
$
|
3,773,227
|
$
|
-
|
$
|
22,019
|
$
|
6,222
|
$
|
(54,430)
|
$
|
(26,189)
|
$
|
3,099,375
|
$
|
6,846,413
|
|
Total comprehensive income
|
|
|
|
|
|
|
|
|
|
||||||||
|
Net earnings
|
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
116,371
|
$
|
116,371
|
|
OCI 1
|
|
|
-
|
|
-
|
|
-
|
|
-
|
|
(54,389)
|
|
(54,389)
|
|
-
|
|
(54,389)
|
|
Total comprehensive income
|
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
(54,389)
|
$
|
(54,389)
|
$
|
116,371
|
$
|
61,982
|
|
SBC 1 expense
|
|
$
|
-
|
$
|
-
|
$
|
735
|
$
|
997
|
$
|
-
|
$
|
1,732
|
$
|
-
|
$
|
1,732
|
|
Options 1 exercised
|
5
|
|
154
|
-
|
(26)
|
-
|
-
|
|
(26)
|
|
-
|
|
128
|
||||
|
Dividends (Note 17.2)
|
22
|
|
952
|
|
-
|
|
-
|
|
-
|
|
-
|
|
-
|
|
(67,946)
|
|
(66,994)
|
|
At September 30, 2023
|
452,996
|
$
|
3,774,333
|
$
|
-
|
$
|
22,728
|
$
|
7,219
|
$
|
(108,819)
|
$
|
(78,872)
|
$
|
3,147,800
|
$
|
6,843,261
|
|
Total comprehensive income
|
|
|
|
|
|
|
|
|
|
||||||||
|
Net earnings
|
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
168,434
|
$
|
168,434
|
|
OCI 1
|
|
|
-
|
|
-
|
|
-
|
|
-
|
|
37,815
|
|
37,815
|
|
-
|
|
37,815
|
|
Total comprehensive income
|
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
37,815
|
$
|
37,815
|
$
|
168,434
|
$
|
206,249
|
|
SBC 1 expense
|
|
$
|
-
|
$
|
-
|
$
|
518
|
$
|
787
|
$
|
-
|
$
|
1,305
|
$
|
-
|
$
|
1,305
|
|
Options 1 exercised
|
54
|
|
2,065
|
-
|
(339)
|
-
|
-
|
|
(339)
|
|
-
|
|
1,726
|
||||
|
Dividends (Note 17.2)
|
19
|
|
925
|
|
-
|
|
-
|
|
-
|
|
-
|
|
-
|
|
(67,950)
|
|
(67,025)
|
|
At December 31, 2023
|
453,069
|
$
|
3,777,323
|
$
|
-
|
$
|
22,907
|
$
|
8,006
|
$
|
(71,004)
|
$
|
(40,091)
|
$
|
3,248,284
|
$
|
6,985,516
|
|
Total comprehensive income
|
|
|
|
|
|
|
|
|
|
||||||||
|
Net earnings
|
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
286,358
|
$
|
286,358
|
|
OCI 1
|
|
|
-
|
|
-
|
|
-
|
|
-
|
|
11,416
|
|
11,416
|
|
-
|
|
11,416
|
|
Total comprehensive income
|
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
11,416
|
$
|
11,416
|
$
|
286,358
|
$
|
297,774
|
|
SBC 1 expense
|
|
$
|
-
|
$
|
-
|
$
|
1,372
|
$
|
1,881
|
$
|
-
|
$
|
3,253
|
$
|
-
|
$
|
3,253
|
|
Options 1 exercised
|
469
|
|
14,426
|
-
|
(2,173)
|
-
|
-
|
|
(2,173)
|
|
-
|
|
12,253
|
||||
|
RSUs 1 released
|
69
|
|
3,013
|
-
|
-
|
(3,013)
|
-
|
|
(3,013)
|
|
-
|
|
-
|
||||
|
Dividends (Note 17.2)
|
28
|
|
1,410
|
-
|
-
|
-
|
-
|
|
-
|
|
(140,534)
|
|
(139,124)
|
||||
|
Realized gain on disposal of LTIs ¹ (Note 18.3)
|
|
|
-
|
-
|
-
|
-
|
(31,578)
|
|
(31,578)
|
|
31,578
|
|
-
|
||||
|
At June 30, 2024
|
453,635
|
$
|
3,796,172
|
$
|
-
|
$
|
22,106
|
$
|
6,874
|
$
|
(91,166)
|
$
|
(62,186)
|
$
|
3,425,686
|
$
|
7,159,672
|
|
Total comprehensive income
|
|
|
|
|
|
|
|
|
|
||||||||
|
Net earnings
|
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
154,635
|
$
|
154,635
|
|
OCI 1
|
|
|
-
|
|
-
|
|
-
|
|
-
|
|
13,094
|
|
13,094
|
|
-
|
|
13,094
|
|
Total comprehensive income
|
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
13,094
|
$
|
13,094
|
$
|
154,635
|
$
|
167,729
|
|
SBC 1 expense
|
|
$
|
-
|
$
|
-
|
$
|
733
|
$
|
992
|
$
|
-
|
$
|
1,725
|
$
|
-
|
$
|
1,725
|
|
Options 1 exercised
|
25
|
|
1,057
|
-
|
(184)
|
-
|
-
|
|
(184)
|
|
-
|
|
873
|
||||
|
Dividends (Note 17.2)
|
6
|
|
329
|
-
|
-
|
-
|
-
|
|
-
|
|
(70,314)
|
|
(69,985)
|
||||
|
Realized gain on disposal of LTIs ¹ (Note 18.3)
|
|
|
-
|
|
-
|
|
-
|
|
-
|
|
3,062
|
|
3,062
|
|
(3,062)
|
|
-
|
|
At September 30, 2024
|
453,666
|
$
|
3,797,558
|
$
|
-
|
$
|
22,655
|
$
|
7,866
|
$
|
(75,010)
|
$
|
(44,489)
|
$
|
3,506,945
|
$
|
7,260,014
|
| 1. |
Description of Business and Nature of Operations
|
| 2. |
Basis of Presentation and Statement of Compliance
|
| 3. |
Material Accounting Policy Information
|
| 3.1. |
New Accounting Standards Effective in 2024
|
| 3.2. |
Future Changes to Accounting Policies
|
| 4. |
Key Sources of Estimation Uncertainty and Critical Accounting Judgments
|
| 5. |
Financial Instruments
|
| 5.1. |
Capital Risk Management
|
| 5.2. |
Categories of Financial Assets and Liabilities
|
|
Note
|
September 30
|
December 31
|
||||
|
(in thousands)
|
2024
|
2023
|
||||
|
Financial assets
|
|
|
||||
|
Financial assets mandatorily measured at FVTNE 1
|
|
|
||||
|
Cash and cash equivalents
|
21
|
$
|
694,085
|
$
|
546,527
|
|
|
Trade receivables from provisional concentrate sales, net of fair value adjustment
|
6, 11
|
|
8,075
|
5,360
|
||
|
Long-term investments - warrants held
|
|
1,695
|
652
|
|||
|
Investments in equity instruments designated at FVTOCI 1
|
|
|
||||
|
Long-term investments - common shares held
|
15
|
|
101,373
|
246,026
|
||
|
Financial assets measured at amortized cost
|
|
|
||||
|
Trade receivables from sales of cobalt
|
11
|
|
441
|
3,975
|
||
|
Refundable deposit - 777 PMPA
|
24
|
|
9,238
|
8,717
|
||
|
Other accounts receivable
|
|
1,919
|
743
|
|||
|
Total financial assets
|
|
$
|
816,826
|
$
|
812,000
|
|
|
Financial liabilities
|
|
|
||||
|
Financial liabilities at amortized cost
|
|
|
||||
|
Accounts payable and accrued liabilities
|
$
|
14,766
|
$
|
13,458
|
||
|
Lease liabilities
|
16.2
|
|
5,664
|
6,229
|
||
|
Total financial liabilities
|
|
$
|
20,430
|
$
|
19,687
|
|
| 1) |
FVTNE refers to Fair Value Through Net Earnings, FVTOCI refers to Fair Value Through Other Comprehensive Income.
|
| 5.3. |
Credit Risk
|
|
September 30
|
December 31
|
||||
|
(in thousands)
|
Note
|
2024
|
2023
|
||
|
Cash and cash equivalents
|
21
|
$
|
694,085
|
$
|
546,527
|
|
Trade receivables from provisional concentrate sales, net of fair value adjustment
|
11
|
|
8,075
|
5,360
|
|
|
Trade receivables from sales of cobalt
|
11
|
|
441
|
3,975
|
|
|
Refundable Deposit - 777 PMPA
|
24
|
|
9,238
|
8,717
|
|
|
Other accounts receivables
|
11
|
|
1,919
|
743
|
|
|
Maximum exposure to credit risk related to financial assets
|
|
$
|
713,758
|
$
|
565,322
|
| 5.4. |
Liquidity Risk
|
|
As at September 30, 2024
|
||||||||||||||
|
(in thousands)
|
2024
|
2025 - 2026
|
2027 - 2028
|
After 2028
|
|
Total
|
||||||||
|
Accounts payable and accrued liabilities
|
$
|
14,766
|
$
|
-
|
$
|
-
|
$
|
-
|
|
$
|
14,766
|
|||
|
Performance share units 1
|
-
|
20,082
|
1,741
|
-
|
|
|
21,823
|
|||||||
|
Total
|
$
|
14,766
|
|
$
|
20,082
|
|
$
|
1,741
|
|
$
|
-
|
|
$
|
36,589
|
| 1) |
See Note 19.1 for estimated value per PSU at maturity and anticipated performance factor at maturity.
|
| 5.5. |
Currency Risk
|
|
|
September 30
|
|
December 31
|
|||
|
(in thousands)
|
|
2024
|
|
2023
|
||
|
Monetary assets
|
|
|
|
|
||
|
Cash and cash equivalents
|
|
$
|
6,674
|
|
$
|
1,729
|
|
Accounts receivable
|
|
|
139
|
|
112
|
|
|
Long-term investments - common shares held
|
|
|
101,373
|
|
77,770
|
|
|
Long-term investments - warrants held
|
|
|
1,695
|
|
652
|
|
|
Other long-term assets
|
|
|
3,319
|
|
|
7,898
|
|
Total Canadian dollar denominated monetary assets
|
|
$
|
113,200
|
|
$
|
88,161
|
|
Monetary liabilities
|
|
|
|
|
||
|
Accounts payable and accrued liabilities
|
|
$
|
7,733
|
|
$
|
9,080
|
|
Performance share units
|
|
|
18,309
|
|
17,303
|
|
|
Lease liability
|
|
|
5,577
|
|
5,892
|
|
|
Pension liability
|
|
|
5,286
|
|
|
4,624
|
|
Total Canadian dollar denominated monetary liabilities
|
|
$
|
36,905
|
|
$
|
36,899
|
|
As at September 30, 2024
|
||||
|
Change in Canadian Dollar
|
||||
|
(in thousands)
|
10%
Increase |
10%
Decrease |
||
|
Increase (decrease) in net earnings
|
$
|
(2,508)
|
$
|
2,508
|
|
Increase (decrease) in other comprehensive income
|
|
10,137
|
|
(10,137)
|
|
Increase (decrease) in total comprehensive income
|
$
|
7,629
|
$
|
(7,629)
|
|
As at December 31, 2023
|
||||
|
Change in Canadian Dollar
|
||||
|
(in thousands)
|
10%
Increase |
10%
Decrease |
||
|
Increase (decrease) in net earnings
|
$
|
(2,651)
|
$
|
2,651
|
|
Increase (decrease) in other comprehensive income
|
|
7,777
|
|
(7,777)
|
|
Increase (decrease) in total comprehensive income
|
$
|
5,126
|
$
|
(5,126)
|
| 5.6. |
Interest Rate Risk
|
| 5.7. |
Other Price Risk
|
| 5.8. |
Fair Value Estimation
|
|
September 30, 2024
|
|||||||||
|
(in thousands)
|
Note
|
Total
|
Level 1
|
Level 2
|
Level 3
|
||||
|
Cash and cash equivalents
|
21
|
$
|
694,085
|
$
|
694,085
|
$
|
-
|
$
|
-
|
|
Trade receivables from provisional concentrate sales, net of fair value adjustment
|
11
|
|
8,075
|
|
-
|
|
8,075
|
|
-
|
|
Long-term investments - common shares held
|
15
|
|
101,373
|
|
101,373
|
|
-
|
|
-
|
|
Long-term investments - warrants held
|
15
|
|
1,695
|
|
-
|
|
1,695
|
|
-
|
|
|
|
$
|
805,228
|
$
|
795,458
|
$
|
9,770
|
$
|
-
|
|
December 31, 2023
|
|||||||||
|
(in thousands)
|
Note
|
Total
|
Level 1
|
Level 2
|
Level 3
|
||||
|
Cash and cash equivalents
|
21
|
$
|
546,527
|
$
|
546,527
|
$
|
-
|
$
|
-
|
|
Trade receivables from provisional concentrate sales, net of fair value adjustment
|
11
|
5,360
|
-
|
5,360
|
-
|
||||
|
Long-term investments - common shares held
|
15
|
246,026
|
246,026
|
-
|
-
|
||||
|
Long-term investments - warrants held
|
15
|
652
|
-
|
652
|
-
|
||||
|
|
|
$
|
798,565
|
$
|
792,553
|
$
|
6,012
|
$
|
-
|
| 5.8.1. |
Valuation Techniques for Level 2 Assets
|
| 6. |
Revenue
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
|||||||||||
|
(in thousands)
|
2024
|
2023
|
2024
|
2023
|
||||||||
|
Sales
|
|
|
|
|
|
|
||||||
|
Gold credit sales
|
$
|
188,521
|
61%
|
$
|
144,707
|
65%
|
$
|
561,360
|
62%
|
$
|
413,414
|
59%
|
|
Silver
|
|
|
|
|
|
|
||||||
|
Silver credit sales
|
$
|
94,749
|
30%
|
$
|
44,404
|
20%
|
$
|
265,000
|
29%
|
$
|
200,409
|
28%
|
|
Concentrate sales
|
|
20,400
|
7%
|
|
25,968
|
12%
|
|
58,098
|
7%
|
|
62,720
|
9%
|
|
Total silver sales
|
$
|
115,149
|
37%
|
$
|
70,372
|
32%
|
$
|
323,098
|
36%
|
$
|
263,129
|
37%
|
|
Palladium credit sales
|
$
|
3,644
|
1%
|
$
|
5,307
|
2%
|
$
|
12,531
|
1%
|
$
|
14,922
|
2%
|
|
Cobalt sales
|
$
|
939
|
1%
|
$
|
2,751
|
1%
|
$
|
7,134
|
1%
|
$
|
11,108
|
2%
|
|
Total sales revenue
|
$
|
308,253
|
100%
|
$
|
223,137
|
100%
|
$
|
904,123
|
100%
|
$
|
702,573
|
100%
|
| 7. |
General and Administrative
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
||||||||
|
(in thousands)
|
|
2024
|
2023
|
2024
|
2023
|
||||
|
Corporate
|
|
|
|
|
|||||
|
Salaries and benefits
|
$
|
3,722
|
$
|
3,443
|
$
|
11,420
|
$
|
10,897
|
|
|
Depreciation
|
|
239
|
224
|
|
684
|
780
|
|||
|
Professional fees
|
|
292
|
430
|
|
1,326
|
1,853
|
|||
|
Business travel
|
|
424
|
257
|
|
1,292
|
909
|
|||
|
Director fees
|
|
269
|
238
|
|
810
|
820
|
|||
|
Business taxes
|
|
94
|
36
|
|
695
|
749
|
|||
|
Audit and regulatory
|
|
688
|
502
|
|
2,437
|
2,671
|
|||
|
Insurance
|
|
486
|
493
|
|
1,338
|
1,550
|
|||
|
Other
|
|
|
1,237
|
|
1,075
|
|
3,444
|
|
3,091
|
|
General and administrative - corporate
|
|
$
|
7,451
|
$
|
6,698
|
$
|
23,446
|
$
|
23,320
|
|
Subsidiaries
|
|
|
|
|
|||||
|
Salaries and benefits
|
$
|
1,280
|
$
|
1,148
|
$
|
4,030
|
$
|
3,465
|
|
|
Depreciation
|
|
119
|
125
|
|
356
|
343
|
|||
|
Professional fees
|
|
37
|
131
|
|
702
|
391
|
|||
|
Business travel
|
|
75
|
76
|
|
298
|
223
|
|||
|
Director fees
|
|
52
|
52
|
|
166
|
155
|
|||
|
Business taxes
|
|
68
|
67
|
|
195
|
206
|
|||
|
Insurance
|
|
13
|
12
|
|
44
|
39
|
|||
|
Other
|
|
|
393
|
|
297
|
|
956
|
|
780
|
|
General and administrative - subsidiaries
|
|
$
|
2,037
|
$
|
1,908
|
$
|
6,747
|
$
|
5,602
|
|
Consolidated general and administrative
|
|
$
|
9,488
|
$
|
8,606
|
$
|
30,193
|
$
|
28,922
|
| 8. |
Share Based Compensation
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
||||||||
|
(in thousands)
|
Note
|
2024
|
2023
|
2024
|
2023
|
||||
|
Equity settled share based compensation 1
|
|
|
|
|
|||||
|
Stock options
|
18.1
|
$
|
733
|
$
|
735
|
$
|
2,104
|
$
|
2,090
|
|
RSUs
|
18.2
|
|
992
|
997
|
|
2,874
|
3,043
|
||
|
Cash settled share based compensation
|
|
|
|
|
|||||
|
PSUs
|
19.1
|
$
|
7,903
|
$
|
2,604
|
$
|
12,172
|
$
|
11,084
|
|
Total share based compensation
|
|
$
|
9,628
|
$
|
4,336
|
$
|
17,150
|
$
|
16,217
|
| 1) |
Equity settled share based compensation is a non-cash expense.
|
| 9. |
Donations and Community Investments
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
||||||||
|
(in thousands)
|
|
2024
|
2023
|
2024
|
2023
|
||||
|
Local donations and community investments 1
|
$
|
853
|
$
|
995
|
$
|
1,950
|
$
|
1,938
|
|
|
Partner donations and community investments 2
|
|
1,499
|
741
|
|
2,676
|
3,116
|
|||
|
Total donations and community investments
|
|
$
|
2,352
|
$
|
1,736
|
$
|
4,626
|
$
|
5,054
|
| 1) |
The Local Community Investment Program supports organizations in Vancouver and the Cayman Islands, where Wheaton’s offices are located.
|
| 2) |
The Partner Community Investment Program supports the communities influenced by Mining Partners' operations.
|
| 10. |
Other Income (Expense)
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
||||||||
|
(in thousands)
|
Note
|
2024
|
2023
|
2024
|
2023
|
||||
|
Interest income
|
$
|
6,767
|
$
|
9,837
|
$
|
16,901
|
$
|
24,948
|
|
|
Dividend income
|
|
482
|
700
|
|
1,663
|
1,616
|
|||
|
Foreign exchange gain (loss)
|
|
(178)
|
313
|
|
444
|
386
|
|||
|
Gain (loss) on fair value adjustment of share purchase warrants held mandatorily measured at FVTNE 1
|
|
523
|
(143)
|
|
903
|
(248)
|
|||
|
Other
|
|
|
11
|
|
-
|
|
11
|
|
259
|
|
Total other income (expense)
|
|
$
|
7,605
|
$
|
10,707
|
$
|
19,922
|
$
|
26,961
|
| 1) |
FVTNE refers to Fair Value Through Net Earnings
|
| 11. |
Accounts Receivable
|
|
September 30
|
December 31
|
||||
|
(in thousands)
|
Note
|
2024
|
2023
|
||
|
Trade receivables from provisional concentrate sales, net of fair value adjustment
|
6
|
$
|
8,075
|
$
|
5,360
|
|
Trade receivables from sales of cobalt
|
6
|
|
441
|
3,975
|
|
|
Other accounts receivable
|
|
|
1,919
|
|
743
|
|
Total accounts receivable
|
|
$
|
10,435
|
$
|
10,078
|
| 12. |
Mineral Stream Interests
|
|
Nine Months Ended September 30, 2024
|
||||||||||||||
|
Cost
|
Accumulated Depletion & Impairment 1
|
Carrying
Amount Sep 30, 2024 |
||||||||||||
|
(in thousands)
|
Balance
Jan 1, 2024 |
Additions
|
Balance
Sep 30, 2024 |
Balance
Jan 1, 2024 |
Depletion
|
Balance
Sep 30, 2024 |
||||||||
|
Gold interests
|
|
|
|
|
|
|
|
|||||||
|
Salobo
|
$
|
3,429,911
|
$
|
-
|
$
|
3,429,911
|
$
|
(748,492)
|
$
|
(65,073)
|
$
|
(813,565)
|
$
|
2,616,346
|
|
Sudbury 2
|
623,864
|
-
|
|
623,864
|
|
(361,379)
|
(15,567)
|
|
(376,946)
|
|
246,918
|
|||
|
Constancia
|
140,058
|
-
|
|
140,058
|
|
(59,793)
|
(10,170)
|
|
(69,963)
|
|
70,095
|
|||
|
San Dimas
|
220,429
|
-
|
|
220,429
|
|
(75,707)
|
(6,215)
|
|
(81,922)
|
|
138,507
|
|||
|
Stillwater 3
|
239,352
|
-
|
|
239,352
|
|
(27,883)
|
(2,995)
|
|
(30,878)
|
|
208,474
|
|||
|
Other 4
|
656,187
|
299,141
|
|
955,328
|
|
(52,498)
|
(950)
|
|
(53,448)
|
|
901,880
|
|||
|
|
$
|
5,309,801
|
$
|
299,141
|
$
|
5,608,942
|
$
|
(1,325,752)
|
$
|
(100,970)
|
$
|
(1,426,722)
|
$
|
4,182,220
|
|
Silver interests
|
|
|
|
|
|
|
|
|||||||
|
Peñasquito
|
$
|
524,626
|
$
|
-
|
|
524,626
|
$
|
(248,394)
|
$
|
(22,771)
|
$
|
(271,165)
|
$
|
253,461
|
|
Antamina
|
900,343
|
-
|
|
900,343
|
|
(380,813)
|
(21,501)
|
|
(402,314)
|
|
498,029
|
|||
|
Constancia
|
302,948
|
-
|
|
302,948
|
|
(123,365)
|
(9,341)
|
|
(132,706)
|
|
170,242
|
|||
|
Other 5
|
1,159,563
|
75,079
|
|
1,234,642
|
|
(577,450)
|
(11,707)
|
|
(589,157)
|
|
645,485
|
|||
|
|
$
|
2,887,480
|
$
|
75,079
|
$
|
2,962,559
|
$
|
(1,330,022)
|
$
|
(65,320)
|
$
|
(1,395,342)
|
$
|
1,567,217
|
|
Palladium interests
|
|
|
|
|
|
|
|
|||||||
|
Stillwater 3
|
$
|
263,721
|
$
|
-
|
$
|
263,721
|
$
|
(43,054)
|
$
|
(5,585)
|
$
|
(48,639)
|
$
|
215,082
|
|
Platreef
|
|
-
|
|
78,820
|
|
78,820
|
|
-
|
|
-
|
|
-
|
|
78,820
|
|
|
$
|
263,721
|
$
|
78,820
|
$
|
342,541
|
$
|
(43,054)
|
$
|
(5,585)
|
$
|
(48,639)
|
$
|
293,902
|
|
Platinum interests
|
|
|
|
|
|
|
|
|||||||
|
Marathon
|
$
|
9,451
|
$
|
-
|
$
|
9,451
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
9,451
|
|
Platreef
|
|
-
|
|
57,588
|
|
57,588
|
|
-
|
|
-
|
|
-
|
|
57,588
|
|
|
$
|
9,451
|
$
|
57,588
|
$
|
67,039
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
67,039
|
|
Cobalt interests
|
|
|
|
|
|
|
|
|||||||
|
Voisey's Bay 6
|
$
|
393,422
|
$
|
-
|
$
|
393,422
|
$
|
(42,606)
|
$
|
(5,071)
|
$
|
(47,677)
|
$
|
345,745
|
|
|
$
|
8,863,875
|
$
|
510,628
|
$
|
9,374,503
|
$
|
(2,741,434)
|
$
|
(176,946)
|
$
|
(2,918,380)
|
$
|
6,456,123
|
| 1) |
Includes cumulative impairment charges to September 30, 2024 as follows: Pascua-Lama silver interest - $338 million; and Sudbury gold interest - $120 million.
|
| 2) |
Comprised of the Coleman, Copper Cliff, Garson, Stobie, Creighton, Totten and Victor gold interests.
|
| 3) |
Comprised of the Stillwater and East Boulder gold and palladium interests.
|
| 4) |
Comprised of the Minto, Copper World Complex, Marmato, Santo Domingo, Fenix, Blackwater, Marathon, Goose, Curipamba, Cangrejos, Curraghinalt, Platreef and Kudz Ze Kayah gold interests. The additions to other gold
interests includes: Platreef - $275 million; Kudz Ze Kayah - $14 million; and Cangrejos - $10 million.
|
| 5) |
Comprised of the Los Filos, Zinkgruvan, Stratoni, Neves-Corvo, Minto, Aljustrel, Loma de La Plata, Pascua-Lama, Copper World Complex, Marmato, Cozamin, Blackwater, Curipamba. Mineral Park and Kudz Ze Kayah silver
interests. The additions to other silver interests includes: Kudz Ze Kayah - $25 million and Mineral Park - $50 million.
|
| 6) |
When cobalt is delivered to the Company it is recorded as inventory until such time as it is sold and the cost of the cobalt is recorded as a cost of sale. Depletion in this table for the Voisey’s Bay cobalt
interest is inclusive of depletion relating to inventory.
|
|
Year Ended December 31, 2023
|
||||||||||||||||
|
Cost
|
Accumulated Depletion & Impairment 1
|
Carrying
Amount Dec 31, 2023 |
||||||||||||||
|
(in thousands)
|
Balance
Jan 1, 2023 |
Additions
|
Disposal
|
Balance
Dec 31, 2023 |
Balance
Jan 1, 2023 |
Depletion
|
Balance
Dec 31, 2023 |
|||||||||
|
Gold interests
|
|
|
|
|
|
|
|
|||||||||
|
Salobo
|
$
|
3,059,876
|
$
|
370,035
|
$
|
-
|
$
|
3,429,911
|
$
|
(676,614)
|
$
|
(71,878)
|
$
|
(748,492)
|
$
|
2,681,419
|
|
Sudbury 2
|
623,864
|
-
|
-
|
|
623,864
|
|
(340,448)
|
(20,931)
|
|
(361,379)
|
|
262,485
|
||||
|
Constancia
|
140,058
|
-
|
-
|
|
140,058
|
|
(44,475)
|
(15,318)
|
|
(59,793)
|
|
80,265
|
||||
|
San Dimas
|
220,429
|
-
|
-
|
|
220,429
|
|
(64,564)
|
(11,143)
|
|
(75,707)
|
|
144,722
|
||||
|
Stillwater 3
|
239,352
|
-
|
-
|
|
239,352
|
|
(23,500)
|
(4,383)
|
|
(27,883)
|
|
211,469
|
||||
|
Other 4
|
545,391
|
152,169
|
(41,373)
|
|
656,187
|
|
(51,248)
|
(1,250)
|
|
(52,498)
|
|
603,689
|
||||
|
|
$
|
4,828,970
|
$
|
522,204
|
$
|
(41,373)
|
$
|
5,309,801
|
$
|
(1,200,849)
|
$
|
(124,903)
|
$
|
(1,325,752)
|
$
|
3,984,049
|
|
Silver interests
|
|
|
|
|
|
|
|
|||||||||
|
Peñasquito
|
$
|
524,626
|
$
|
-
|
$
|
-
|
$
|
524,626
|
$
|
(230,952)
|
$
|
(17,442)
|
$
|
(248,394)
|
$
|
276,232
|
|
Antamina
|
900,343
|
-
|
-
|
|
900,343
|
|
(354,975)
|
(25,838)
|
|
(380,813)
|
|
519,530
|
||||
|
Constancia
|
302,948
|
-
|
-
|
|
302,948
|
|
(110,001)
|
(13,364)
|
|
(123,365)
|
|
179,583
|
||||
|
Other 5
|
1,018,199
|
141,364
|
-
|
|
1,159,563
|
|
(565,103)
|
(12,347)
|
|
(577,450)
|
|
582,113
|
||||
|
|
$
|
2,746,116
|
$
|
141,364
|
$
|
-
|
$
|
2,887,480
|
$
|
(1,261,031)
|
$
|
(68,991)
|
$
|
(1,330,022)
|
$
|
1,557,458
|
|
Palladium interests
|
|
|
|
|
|
|
|
|||||||||
|
Stillwater 3
|
$
|
263,721
|
$
|
-
|
$
|
-
|
$
|
263,721
|
$
|
(36,909)
|
$
|
(6,145)
|
$
|
(43,054)
|
$
|
220,667
|
|
Platinum interests
|
|
|
|
|
|
|
|
|||||||||
|
Marathon
|
$
|
9,428
|
$
|
23
|
$
|
-
|
$
|
9,451
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
9,451
|
|
Cobalt interests
|
|
|
|
|
|
|
|
|||||||||
|
Voisey's Bay 6
|
$
|
393,422
|
$
|
-
|
$
|
-
|
$
|
393,422
|
$
|
(35,849)
|
$
|
(6,757)
|
$
|
(42,606)
|
$
|
350,816
|
|
|
$
|
8,241,657
|
$
|
663,591
|
$
|
(41,373)
|
$
|
8,863,875
|
$
|
(2,534,638)
|
$
|
(206,796)
|
$
|
(2,741,434)
|
$
|
6,122,441
|
| 1) |
Includes cumulative impairment charges to December 31, 2023 as follows: Pascua-Lama silver interest - $338 million; and Sudbury gold interest - $120 million.
|
| 2) |
Comprised of the Coleman, Copper Cliff, Garson, Stobie, Creighton, Totten and Victor gold interests.
|
| 3) |
Comprised of the Stillwater and East Boulder gold and palladium interests.
|
| 4) |
Comprised of the Minto, Copper World Complex, Marmato, Santo Domingo, Fenix, Blackwater, Marathon, Goose, Curipamba, Cangrejos and Curraghinalt gold interests. The additions to other gold interests includes:
Blackwater - $40 million; Goose - $63 million; Cangrejos - $29 million; and Curraghinalt - $20 million.
|
| 5) |
Comprised of the Los Filos, Zinkgruvan, Stratoni, Neves-Corvo, Minto, Aljustrel, Loma de La Plata, Pascua-Lama, Copper World Complex, Marmato, Cozamin, Blackwater, Curipamba and Mineral Park silver interests. The
additions to other silver interests includes: Blackwater - $141 million.
|
| 6) |
When cobalt is delivered to the Company it is recorded as inventory until such time as it is sold and the cost of the cobalt is recorded as a cost of sale. Depletion in this table for the Voisey’s Bay cobalt
interest is inclusive of depletion relating to inventory.
|
|
September 30, 2024
|
December 31, 2023
|
|||||||||||
|
(in thousands)
|
Depletable
|
Non-
Depletable
|
Total
|
Depletable
|
Non-
Depletable
|
Total
|
||||||
|
Gold interests
|
|
|
|
|
|
|
||||||
|
Salobo
|
$
|
2,290,171
|
$
|
326,175
|
$
|
2,616,346
|
$
|
2,303,719
|
$
|
377,700
|
$
|
2,681,419
|
|
Sudbury 1
|
|
205,207
|
|
41,711
|
|
246,918
|
218,467
|
44,018
|
262,485
|
|||
|
Constancia
|
|
66,490
|
|
3,605
|
|
70,095
|
74,758
|
5,507
|
80,265
|
|||
|
San Dimas
|
|
49,213
|
|
89,294
|
|
138,507
|
55,428
|
89,294
|
144,722
|
|||
|
Stillwater 2
|
|
188,840
|
|
19,634
|
|
208,474
|
186,668
|
24,801
|
211,469
|
|||
|
Other 3
|
|
17,048
|
|
884,832
|
|
901,880
|
|
17,999
|
|
585,690
|
|
603,689
|
|
|
$
|
2,816,969
|
$
|
1,365,251
|
$
|
4,182,220
|
$
|
2,857,039
|
$
|
1,127,010
|
$
|
3,984,049
|
|
Silver interests
|
|
|
|
|
|
|
||||||
|
Peñasquito
|
$
|
253,461
|
$
|
-
|
$
|
253,461
|
$
|
202,528
|
$
|
73,704
|
$
|
276,232
|
|
Antamina
|
|
151,011
|
|
347,018
|
|
498,029
|
172,512
|
347,018
|
519,530
|
|||
|
Constancia
|
|
163,760
|
|
6,482
|
|
170,242
|
169,527
|
10,056
|
179,583
|
|||
|
Other 4
|
|
126,773
|
|
518,712
|
|
645,485
|
|
130,462
|
|
451,651
|
|
582,113
|
|
|
$
|
695,005
|
$
|
872,212
|
$
|
1,567,217
|
$
|
675,029
|
$
|
882,429
|
$
|
1,557,458
|
|
Palladium interests
|
|
|
|
|
|
|
||||||
|
Stillwater 2
|
$
|
207,594
|
$
|
7,488
|
$
|
215,082
|
$
|
211,959
|
$
|
8,708
|
$
|
220,667
|
|
Platreef
|
|
-
|
|
78,820
|
|
78,820
|
|
-
|
|
-
|
|
-
|
|
|
$
|
207,594
|
$
|
86,308
|
$
|
293,902
|
$
|
211,959
|
$
|
8,708
|
$
|
220,667
|
|
Platinum interests
|
|
|
|
|
|
|
||||||
|
Marathon
|
$
|
-
|
$
|
9,451
|
$
|
9,451
|
$
|
-
|
$
|
9,451
|
$
|
9,451
|
|
Platreef
|
|
-
|
|
57,588
|
|
57,588
|
|
-
|
|
-
|
|
-
|
|
|
$
|
-
|
$
|
67,039
|
$
|
67,039
|
$
|
-
|
$
|
9,451
|
$
|
9,451
|
|
Cobalt interests
|
|
|
|
|
|
|
||||||
|
Voisey's Bay
|
$
|
320,473
|
$
|
25,272
|
$
|
345,745
|
$
|
321,454
|
$
|
29,362
|
$
|
350,816
|
|
|
$
|
4,040,041
|
$
|
2,416,082
|
$
|
6,456,123
|
$
|
4,065,481
|
$
|
2,056,960
|
$
|
6,122,441
|
| 1) |
Comprised of the Coleman, Copper Cliff, Garson, Stobie, Creighton, Totten and Victor gold interests.
|
| 2) |
Comprised of the Stillwater and East Boulder gold and palladium interests.
|
| 3) |
Comprised of the Minto, Copper World Complex, Marmato, Santo Domingo, Fenix, Blackwater, Marathon, Goose, Curipamba, Cangrejos, Curraghinalt, Platreef and Kudz Ze Kayah gold interests.
|
| 4) |
Comprised of the Los Filos, Zinkgruvan, Stratoni, Neves-Corvo, Minto, Aljustrel, Loma de La Plata, Pascua-Lama, Copper World Complex, Marmato, Cozamin, Blackwater, Curipamba, Mineral Park and Kudz Ze Kayah silver
interests.
|
|
(in thousands)
|
|
|
|
Proceeds received on 33% buyback of Goose
|
$
|
46,400
|
|
Less: 33% carrying value
|
|
(41,373)
|
|
Gain on partial disposal of the Goose PMPA
|
$
|
5,027
|
| 13. |
Early Deposit Mineral Stream Interests
|
|
|
Mine
Owner |
|
|
|
|
|
|
|
Attributable
Production to be Purchased |
|
|
|
Early Deposit Mineral Stream Interests
|
Location of
Mine |
Upfront
Consideration
Paid to Date 1
|
Upfront
Consideration to be Paid 1, 2 |
Total
Upfront Consideration¹ |
Gold
|
Silver
|
Term of
Agreement |
||||
|
Toroparu
|
Aris Mining
|
Guyana
|
$
|
15,500
|
$
|
138,000
|
$
|
153,500
|
10%
|
50%
|
Life of Mine
|
|
Cotabambas
|
Panoro
|
Peru
|
14,000
|
126,000
|
140,000
|
25% ³
|
100% ³
|
Life of Mine
|
|||
|
Kutcho
|
Kutcho
|
Canada
|
|
16,852
|
|
58,000
|
|
74,852
|
100%
|
100%
|
Life of Mine
|
|
|
|
|
$
|
46,352
|
$
|
322,000
|
$
|
368,352
|
|
|
|
| 1) |
Expressed in thousands of United States dollars; excludes closing costs and capitalized interest, where applicable.
|
| 2) |
Please refer to Note 25 for details of when the remaining upfront consideration to be paid becomes due.
|
| 3) |
Once 90 million silver equivalent ounces attributable to Wheaton have been produced, the attributable production will decrease to 16.67% of gold production and 66.67% of silver production for the life of mine.
|
| 14. |
Mineral Royalty Interests
|
|
Royalty Interests
|
Mine
Owner |
Location of
Mine |
Royalty 1
|
Upfront
Consideration
Paid to Date 2
|
Upfront
Consideration to be Paid 2 |
Total
Upfront Consideration 2 |
Term of
Agreement |
Date of
Original
Contract
|
|||
|
Metates
|
Chesapeake
|
Mexico
|
0.5% NSR
|
$
|
3,000
|
$
|
-
|
$
|
3,000
|
Life of Mine
|
07-Aug-2014
|
|
Brewery Creek 3
|
Victoria Gold
|
Canada
|
2.0% NSR
|
3,529
|
-
|
3,529
|
Life of Mine
|
04-Jan-2021
|
|||
|
Black Pine 4
|
Liberty Gold
|
USA
|
0.5% NSR
|
3,600
|
-
|
3,600
|
Life of Mine
|
10-Sep-2023
|
|||
|
Mt Todd 5
|
Vista
|
Australia
|
1.0% GR
|
20,000
|
-
|
20,000
|
Life of Mine
|
13-Dec-2023
|
|||
|
DeLamar 6
|
Integra
|
USA
|
1.5% NSR
|
9,750
|
-
|
9,750
|
Life of Mine
|
20-Feb-2024
|
|||
|
|
|
|
|
$
|
39,879
|
$
|
-
|
$
|
39,879
|
|
|
| 1) |
Abbreviation as follows: NSR = Net Smelter Return Royalty; and GR = Gross Royalty.
|
| 2) |
Expressed in thousands; excludes closing costs.
|
| 3) |
The Company paid $3 million for an existing 2.0% net smelter return royalty interests on the first 600,000 ounces of gold mined and a 2.75% net smelter returns royalty interest thereafter. The Brewery Creek Royalty
agreement provides, among other things, that Golden Predator Mining Corp., (subsidiary of Victoria Gold) may reduce the 2.75% net smelter royalty interest to 2.125% on payment of the sum of Cdn $2 million to the Company.
|
| 4) |
Liberty Gold has been granted an option to repurchase 50% of the NSR for $4 million at any point in time up to the earlier of commercial production at Black Pine or January 1, 2030.
|
| 5) |
The Mt Todd royalty is at a rate of 1% of gross revenue with such rate being subject to increase to a maximum rate of 2%, depending on the timing associated with the achievement of certain operational milestones.
|
| 6) |
Under the DeLamar royalty, if completion is not achieved by January 1, 2029, the DeLamar Royalty will increase annually by 0.15% of net smelter returns to a maximum of 2.7% of net smelter returns.
|
| 15. |
Long-Term Equity Investments
|
|
September 30
|
December 31
|
|||
|
(in thousands)
|
2024
|
2023
|
||
|
Common shares held
|
$
|
101,373
|
$
|
246,026
|
|
Warrants held
|
|
1,695
|
|
652
|
|
Total long-term equity investments
|
$
|
103,068
|
$
|
246,678
|
|
Three Months Ended September 30, 2024
|
||||||||
|
(in thousands)
|
Shares
Owned (000's) |
% of
Outstanding
Shares Owned
|
Fair Value at
Jun 30, 2024 |
Cost of
Additions
|
Proceeds of
Disposition 1
|
Fair Value
Adjustment
Gains (Losses) 2
|
Fair Value at
Sep 30, 2024 |
Realized Loss
on Disposal
|
|
Kutcho
|
18,640
|
12.03%
|
$ 2,248
|
$ -
|
$ -
|
$ (797)
|
$ 1,451
|
$ -
|
|
B2Gold
|
12,025
|
0.92%
|
32,243
|
-
|
-
|
4,992
|
37,235
|
-
|
|
Silvercorp
|
3,759
|
1.73%
|
-
|
12,017
|
-
|
4,384
|
16,401
|
-
|
|
Aris
|
4,715
|
2.77%
|
17,810
|
-
|
-
|
4,055
|
21,865
|
-
|
|
Other
|
|
|
34,598
|
728
|
(12,018)
|
1,113
|
24,421
|
(3,543)
|
|
Total
|
|
|
$ 86,899
|
$ 12,745
|
$ (12,018)
|
$ 13,747
|
$ 101,373
|
$ (3,543)
|
| 1) |
The disposal during the third quarter was as a result of the acquisition of the companies to which the shares relate by unrelated third party entities.
|
| 2) |
Fair Value Gains (Losses) are reflected as a component of Other Comprehensive Income (“OCI”).
|
|
|
Three Months Ended September 30, 2023
|
|||||||
|
(in thousands)
|
Shares
Owned (000's) |
% of
Outstanding
Shares Owned
|
Fair Value at
Jun 30, 2023 |
Cost of
Additions
|
Proceeds of
Disposition
|
Fair Value
Adjustment
Gains (Losses) 1
|
Fair Value at
Sep 30, 2023 |
Realized Loss
on Disposal
|
|
Kutcho
|
18,640
|
13.27%
|
$ 2,605
|
$ -
|
$ -
|
$ (881)
|
$ 1,724
|
$ -
|
|
Hecla
|
34,980
|
5.67%
|
180,148
|
-
|
-
|
(43,375)
|
136,773
|
-
|
|
B2Gold
|
12,025
|
0.93%
|
42,867
|
-
|
-
|
(8,181)
|
34,686
|
-
|
|
Aris
|
4,715
|
3.44%
|
11,360
|
-
|
-
|
(584)
|
10,776
|
-
|
|
Other
|
|
|
18,096
|
5,006
|
-
|
(6,483)
|
16,619
|
-
|
|
Total
|
|
|
$ 255,076
|
$ 5,006
|
$ -
|
$ (59,504)
|
$ 200,578
|
$ -
|
| 1) |
Fair Value Gains (Losses) are reflected as a component of OCI.
|
|
Nine Months Ended September 30, 2024
|
||||||||
|
(in thousands)
|
Shares
Owned (000's) |
% of
Outstanding
Shares Owned
|
Fair Value at
Dec 31, 2023 |
Cost of
Additions |
Proceeds of
Disposition 1 |
Fair Value
Adjustment
Gains (Losses) 2
|
Fair Value at
Sep 30, 2024 |
Realized Gain
(Loss) on
Disposal
|
|
Kutcho
|
18,640
|
12.03%
|
$ 1,551
|
$ -
|
$ -
|
$ (100)
|
$ 1,451
|
$ -
|
|
Hecla
|
-
|
-
|
168,255
|
-
|
(177,088)
|
8,833
|
-
|
35,768
|
|
B2Gold
|
12,025
|
0.92%
|
38,094
|
-
|
-
|
(859)
|
37,235
|
-
|
|
Silvercorp
|
3,759
|
1.73%
|
-
|
12,017
|
-
|
4,384
|
16,401
|
-
|
|
Aris
|
4,715
|
2.77%
|
15,579
|
-
|
-
|
6,286
|
21,865
|
-
|
|
Other
|
|
|
22,547
|
5,849
|
(12,018)
|
8,043
|
24,421
|
(3,543)
|
|
Total
|
|
|
$ 246,026
|
$ 17,866
|
$ (189,106)
|
$ 26,587
|
$ 101,373
|
$ 32,225
|
| 1) |
The disposition of the Hecla shares was made in order to capitalize on Hecla’s share price appreciation, while the disposal under “other” was as a result of the acquisition of the companies to which the shares
relate by unrelated third party entities.
|
| 2) |
Fair Value Gains (Losses) are reflected as a component of OCI.
|
|
Nine Months Ended September 30, 2023
|
||||||||
|
(in thousands)
|
Shares
Owned (000's) |
% of
Outstanding
Shares Owned
|
Fair Value at
Dec 31, 2022 |
Cost of
Additions
|
Proceeds of
Disposition 1
|
Fair Value
Adjustment
Gains (Losses) 2 |
Fair Value at
Sep 30, 2023 |
Realized Gain
(Loss) on
Disposal
|
|
Sabina
|
-
|
-
|
$ 30,535
|
$ -
|
$ (48,832)
|
$ 18,297
|
$ -
|
$ 872
|
|
Kutcho
|
18,640
|
13.27%
|
3,097
|
-
|
-
|
(1,373)
|
1,724
|
-
|
|
Hecla
|
34,980
|
5.67%
|
194,668
|
-
|
(202)
|
(57,693)
|
136,773
|
73
|
|
B2Gold
|
12,025
|
0.93%
|
-
|
48,832
|
-
|
(14,146)
|
34,686
|
-
|
|
Aris
|
4,715
|
3.44%
|
11,662
|
-
|
-
|
(886)
|
10,776
|
-
|
|
Other
|
|
|
15,573
|
13,205
|
(27)
|
(12,132)
|
16,619
|
(990)
|
|
Total
|
|
|
$ 255,535
|
$ 62,037
|
$ (49,061)
|
$ (67,933)
|
$ 200,578
|
$ (45)
|
| 1) |
The disposal of the Sabina shares was as a result of the acquisition of Sabina by B2Gold, while the partial disposition of the Hecla shares was made in order to capitalize on Hecla’s share price appreciation.
|
| 2) |
Fair Value Gains (Losses) are reflected as a component of OCI.
|
| 16. |
Credit Facilities
|
| 16.1. |
Sustainability-Linked Revolving Credit Facility
|
| 16.2. |
Lease Liabilities
|
|
September 30
|
December 31
|
|||
|
(in thousands)
|
2024
|
2023
|
||
|
Current portion
|
$
|
324
|
$
|
604
|
|
Long-term portion
|
|
5,340
|
|
5,625
|
|
Total lease liabilities
|
$
|
5,664
|
$
|
6,229
|
|
September 30
|
||
|
(in thousands)
|
2024
|
|
|
Not later than 1 year
|
$
|
596
|
|
Later than 1 year and not later than 5 years
|
2,609
|
|
|
Later than 5 years
|
|
4,186
|
|
Total lease liabilities
|
$
|
7,391
|
| 16.3. |
Finance Costs
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
||||||||
|
(in thousands)
|
Note
|
2024
|
2023
|
2024
|
2023
|
||||
|
Costs related to undrawn credit facilities
|
16.1
|
$
|
1,333
|
$
|
1,286
|
$
|
4,010
|
$
|
3,876
|
|
Interest expense - lease liabilities
|
16.2
|
|
71
|
78
|
|
216
|
131
|
||
|
Letters of guarantee
|
|
|
-
|
|
43
|
|
(82)
|
|
131
|
|
Total finance costs
|
|
$
|
1,404
|
$
|
1,407
|
$
|
4,144
|
$
|
4,138
|
| 17. |
Issued Capital
|
|
Note
|
September 30
|
December 31
|
|||
|
(in thousands)
|
2024
|
2023
|
|||
|
Issued capital
|
|
|
|||
|
Share capital issued and outstanding: 453,665,723 common shares (December 31, 2023: 453,069,254 common shares)
|
17.1
|
$
|
3,797,558
|
$
|
3,777,323
|
| 17.1. |
Shares Issued
|
|
|
Number
of Shares |
Weighted
Average Price |
|
At January 1, 2023
|
452,318,526
|
|
|
Share purchase options exercised 1
|
430,247
|
Cdn$31.52
|
|
Restricted share units released 1
|
119,827
|
Cdn$0.00
|
|
Dividend reinvestment plan 2
|
100,732
|
US$47.23
|
|
At June 30, 2023
|
452,969,332
|
|
|
Share purchase options exercised 1
|
4,563
|
Cdn$38.14
|
|
Dividend reinvestment plan 2
|
22,246
|
US$42.77
|
|
At September 30, 2023
|
452,996,141
|
|
|
Share purchase options exercised 1
|
54,112
|
Cdn$42.72
|
|
Dividend reinvestment plan 2
|
19,001
|
US$48.70
|
|
At December 31, 2023
|
453,069,254
|
|
|
Share purchase options exercised 1
|
469,359
|
Cdn$35.58
|
|
Restricted share units released 1
|
69,494
|
Cdn$0.00
|
|
Dividend reinvestment plan 2
|
27,139
|
US$51.95
|
|
At June 30, 2024
|
453,635,246
|
|
|
Share purchase options exercised 1
|
25,098
|
Cdn$47.17
|
|
Dividend reinvestment plan 2
|
5,379
|
US$61.25
|
|
At September 30, 2024
|
453,665,723
|
|
| 1) |
The weighted average price of share purchase options exercised and restricted share units released represents the respective exercise price.
|
| 2) |
The Company has implemented a dividend reinvestment plan (“DRIP”) whereby shareholders can elect to have dividends reinvested directly into additional Wheaton common shares. The weighted average price for common
shares issued under the DRIP represents the volume weighted average price of the common shares on the five trading days preceding the dividend payment date.
|
| 17.2. |
Dividends Declared
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
|||||||||||
|
(in thousands, except per share amounts)
|
2024
|
2023
|
2024
|
2023
|
||||||||
|
Dividends declared per share
|
$
|
0.155
|
|
$
|
0.150
|
$
|
0.465
|
|
$
|
0.450
|
||
|
Average number of shares eligible for dividend
|
|
453,638
|
|
|
452,971
|
|
|
453,435
|
|
|
452,875
|
|
|
Total dividends paid
|
$
|
70,314
|
|
$
|
67,946
|
|
$
|
210,847
|
|
$
|
203,794
|
|
|
Paid as follows:
|
|
|
|
|
|
|
||||||
|
Cash
|
$
|
69,984
|
100%
|
$
|
66,994
|
99%
|
$
|
209,108
|
99%
|
$
|
198,085
|
97%
|
|
DRIP 1
|
|
330
|
0%
|
|
952
|
1%
|
|
1,739
|
1%
|
|
5,709
|
3%
|
|
Total dividends paid
|
$
|
70,314
|
100%
|
$
|
67,946
|
100%
|
$
|
210,847
|
100%
|
$
|
203,794
|
100%
|
| 1) |
The Company has implemented a DRIP whereby shareholders can elect to have dividends reinvested directly into additional Wheaton common shares.
|
| 18. |
Reserves
|
|
Note
|
September 30
|
December 31
|
|||
|
(in thousands)
|
2024
|
2023
|
|||
|
Reserves
|
|
|
|||
|
Share purchase options
|
18.1
|
$
|
22,655
|
$
|
22,907
|
|
Restricted share units
|
18.2
|
|
7,866
|
8,006
|
|
|
Long-term investment revaluation reserve, net of tax
|
18.3
|
|
(75,010)
|
|
(71,004)
|
|
Total reserves
|
|
$
|
(44,489)
|
$
|
(40,091)
|
| 18.1. |
Share Purchase Options
|
|
Nine Months Ended
September 30 |
||
|
|
2024
|
2023
|
|
Black-Scholes weighted average assumptions
|
|
|
|
Grant date share price and exercise price
|
Cdn$59.79
|
Cdn$59.41
|
|
Expected dividend yield
|
1.45%
|
1.39%
|
|
Expected volatility
|
30%
|
30%
|
|
Risk-free interest rate
|
4.10%
|
3.40%
|
|
Expected option life, in years
|
3.0
|
3.0
|
|
Weighted average fair value per option granted
|
Cdn$13.39
|
Cdn$12.89
|
|
Number of options issued during the period
|
305,710
|
316,580
|
|
Total fair value of options issued (000's)
|
$ 3,022
|
$ 2,972
|
|
Exercise Price (Cdn$)
|
Exercisable
Options |
Non-Exercisable
Options |
Total Options
Outstanding |
Weighted Average
Remaining Contractual Life |
|
$32.51¹
|
7,240
|
-
|
7,240
|
0.5 years
|
|
$33.47
|
1,530
|
-
|
1,530
|
0.5 years
|
|
$49.86
|
219,496
|
-
|
219,496
|
3.5 years
|
|
$53.93¹
|
19,280
|
-
|
19,280
|
3.5 years
|
|
$58.41¹
|
10,868
|
30,550
|
41,418
|
5.5 years
|
|
$59.41
|
78,377
|
165,136
|
243,513
|
5.5 years
|
|
$59.60¹
|
-
|
68,530
|
68,530
|
6.5 years
|
|
$59.79
|
-
|
237,180
|
237,180
|
6.5 years
|
|
$60.00
|
134,258
|
72,473
|
206,731
|
4.5 years
|
|
$63.39¹
|
18,903
|
12,713
|
31,616
|
4.5 years
|
|
|
489,952
|
586,582
|
1,076,534
|
5.0 years
|
|
1) US$ share purchase options converted to Cdn$ using the exchange rate of 1.3499, being the Cdn$/US$ exchange rate at September 30, 2024.
|
||||
|
|
Number of
Options Outstanding |
Weighted
Average Exercise Price |
|
At January 1, 2023
|
1,478,300
|
Cdn$41.37
|
|
Granted (fair value - $3 million or Cdn$12.89 per option)
|
316,580
|
59.41
|
|
Exercised
|
(430,247)
|
31.52
|
|
Forfeited
|
(2,750)
|
57.48
|
|
At June 30, 2023
|
1,361,883
|
Cdn$48.43
|
|
Exercised
|
(4,563)
|
38.14
|
|
At September 30, 2023
|
1,357,320
|
Cdn$48.64
|
|
Exercised
|
(54,112)
|
42.72
|
|
Forfeited
|
(33,187)
|
59.60
|
|
At December 31, 2023
|
1,270,021
|
Cdn$48.47
|
|
Granted (fair value - $3 million or Cdn$13.39 per option)
|
305,710
|
59.79
|
|
Exercised
|
(469,359)
|
35.58
|
|
Forfeited
|
(4,740)
|
59.59
|
|
At June 30, 2024
|
1,101,632
|
Cdn$57.33
|
|
Exercised
|
(25,098)
|
47.17
|
|
At September 30, 2024
|
1,076,534
|
Cdn$57.43
|
| 18.2. |
Restricted Share Units (“RSUs”)
|
|
|
Number of
RSUs Outstanding |
Weighted
Average Intrinsic Value at Date Granted |
|
At January 1, 2023
|
350,206
|
$31.25
|
|
Granted (fair value - $4 million)
|
93,990
|
43.35
|
|
Released
|
(119,827)
|
33.10
|
|
Forfeited
|
(610)
|
44.38
|
|
At September 30, 2023
|
323,759
|
$34.05
|
|
Forfeited
|
(7,423)
|
44.39
|
|
At December 31, 2023
|
316,336
|
$33.81
|
|
Granted (fair value - $4 million)
|
91,130
|
44.27
|
|
Released
|
(69,494)
|
43.36
|
|
Forfeited
|
(1,043)
|
44.40
|
|
At September 30, 2024
|
336,929
|
$34.64
|
| 18.3. |
Long-Term Investment Revaluation Reserve
|
|
(in thousands)
|
|
Change in
Fair Value
|
Deferred Tax Recovery (Expense)
|
Total
|
|
At January 1, 2023
|
$ (40,626)
|
$ (6,624)
|
$ (47,250)
|
|
|
Unrealized gain (loss) on LTIs 1
|
(8,429)
|
2,090
|
(6,339)
|
|
|
Reallocate reserve to retained earnings upon disposal of LTIs 1
|
15
|
(841)
|
-
|
(841)
|
|
At June 30, 2023
|
|
$ (49,896)
|
$ (4,534)
|
$ (54,430)
|
|
Unrealized gain (loss) on LTIs 1
|
(59,504)
|
5,115
|
(54,389)
|
|
|
At September 30, 2023
|
|
$(109,400)
|
$ 581
|
$(108,819)
|
|
Unrealized gain (loss) on LTIs 1
|
41,301
|
(3,486)
|
37,815
|
|
|
At December 31, 2023
|
|
$ (68,099)
|
$ (2,905)
|
$ (71,004)
|
|
Unrealized gain (loss) on LTIs 1
|
12,839
|
(1,423)
|
11,416
|
|
|
Reallocate reserve to retained earnings upon disposal of LTIs 1
|
(35,768)
|
4,190
|
(31,578)
|
|
|
At June 30, 2024
|
|
$ (91,028)
|
$ (138)
|
$ (91,166)
|
|
Unrealized gain (loss) on LTIs 1
|
13,747
|
(653)
|
13,094
|
|
|
Reallocate reserve to retained earnings upon disposal of LTIs 1
|
15
|
3,543
|
(481)
|
3,062
|
|
At September 30, 2024
|
|
$ (73,738)
|
$ (1,272)
|
$ (75,010)
|
| 1) |
LTIs refers to long-term investments in common shares held.
|
| 19. |
Share Based Compensation
|
| 19.1. |
Performance Share Units (“PSUs”)
|
|
(in thousands, except for number of PSUs outstanding)
|
Number of PSUs
Outstanding |
PSU accrual liability
|
|
|
At January 1, 2023
|
444,620
|
$
|
21,239
|
|
Granted
|
135,690
|
-
|
|
|
Accrual related to the fair value of the PSUs outstanding
|
-
|
8,500
|
|
|
Foreign exchange adjustment
|
-
|
198
|
|
|
Paid
|
(191,980)
|
(16,675)
|
|
|
Forfeited
|
(1,280)
|
|
(21)
|
|
At June 30, 2023
|
387,050
|
$
|
13,241
|
|
Accrual related to the fair value of the PSUs outstanding
|
-
|
2,604
|
|
|
Foreign exchange adjustment
|
-
|
|
(219)
|
|
At September 30, 2023
|
387,050
|
$
|
15,626
|
|
Accrual related to the fair value of the PSUs outstanding
|
-
|
5,566
|
|
|
Foreign exchange adjustment
|
-
|
278
|
|
|
Forfeited
|
(14,590)
|
|
(344)
|
|
At December 31, 2023
|
372,460
|
$
|
21,126
|
|
Granted
|
135,220
|
-
|
|
|
Accrual related to the fair value of the PSUs outstanding
|
-
|
4,318
|
|
|
Foreign exchange adjustment
|
-
|
(507)
|
|
|
Paid
|
(126,590)
|
(11,129)
|
|
|
Forfeited
|
(2,120)
|
|
(49)
|
|
At June 30, 2024
|
378,970
|
$
|
13,759
|
|
Accrual related to the fair value of the PSUs outstanding
|
-
|
7,903
|
|
|
Foreign exchange adjustment
|
-
|
161
|
|
|
At September 30, 2024
|
378,970
|
$
|
21,823
|
|
Year
of Grant |
Year of
Maturity |
Number
outstanding |
Estimated
Value Per PSU
at Maturity
|
Anticipated
Performance Factor at Maturity |
Percent of Vesting Period Complete at
Sep 30, 2024 |
PSU
Liability at Sep 30, 2024 |
|
2022
|
2025
|
118,240
|
$64.37
|
194%
|
85%
|
$ 12,522
|
|
2023
|
2026
|
125,510
|
$63.52
|
184%
|
51%
|
7,560
|
|
2024
|
2027
|
135,220
|
$63.40
|
116%
|
18%
|
1,741
|
|
|
|
378,970
|
|
|
|
$ 21,823
|
| 20. |
Earnings per Share (“EPS”) and Diluted Earnings per Share (“Diluted EPS”)
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
|||
|
(in thousands)
|
2024
|
2023
|
2024
|
2023
|
|
Basic weighted average number of shares outstanding
|
453,641
|
452,975
|
453,389
|
452,748
|
|
Effect of dilutive securities
|
|
|
||
|
Share purchase options
|
324
|
239
|
317
|
327
|
|
Restricted share units
|
337
|
324
|
331
|
344
|
|
Diluted weighted average number of shares outstanding
|
454,302
|
453,538
|
454,037
|
453,419
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
|||
|
(in thousands)
|
2024
|
2023
|
2024
|
2023
|
|
Share purchase options
|
-
|
591
|
-
|
53
|
| 21. |
Supplemental Cash Flow Information
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
|||||||
|
(in thousands)
|
2024
|
2023
|
2024
|
2023
|
||||
|
Change in non-cash working capital
|
|
|
|
|
||||
|
Accounts receivable
|
$
|
(267)
|
$
|
(3,580)
|
$
|
139
|
$
|
(599)
|
|
Accounts payable and accrued liabilities
|
|
2,643
|
2,462
|
|
1,381
|
(542)
|
||
|
Other
|
|
461
|
|
629
|
|
(191)
|
|
265
|
|
Total change in non-cash working capital
|
$
|
2,837
|
$
|
(489)
|
$
|
1,329
|
$
|
(876)
|
|
September 30
|
December 31
|
||||
|
(in thousands)
|
|
2024
|
2023
|
||
|
Cash and cash equivalents comprised of:
|
|
|
|||
|
Cash
|
$
|
644,628
|
$
|
211,430
|
|
|
Cash equivalents
|
|
|
49,457
|
|
335,097
|
|
Total cash and cash equivalents
|
|
$
|
694,085
|
$
|
546,527
|
| 22. |
Income Taxes
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
||||||||
|
(in thousands)
|
2024
|
2023
|
2024
|
2023
|
|||||
|
Current income tax expense (recovery)
|
$
|
780
|
$
|
31
|
$
|
(2,029)
|
$
|
(2,529)
|
|
|
Global minimum income tax expense
|
|
|
27,851
|
|
-
|
|
78,361
|
|
-
|
|
Total current income tax expense (recovery)
|
|
$
|
28,631
|
$
|
31
|
$
|
76,332
|
$
|
(2,529)
|
|
Deferred income tax expense (recovery) related to:
|
|
|
|
|
|||||
|
Origination and reversal of temporary differences
|
$
|
(595)
|
$
|
423
|
$
|
3,900
|
$
|
3,484
|
|
|
Write down (reversal of write down) or recognition of prior period temporary differences
|
|
|
(525)
|
|
4,691
|
|
(2,236)
|
|
3,745
|
|
Total deferred income tax expense (recovery)
|
|
$
|
(1,120)
|
$
|
5,114
|
$
|
1,664
|
$
|
7,229
|
|
Total income tax expense (recovery) recognized in net earnings
|
|
$
|
27,511
|
$
|
5,145
|
$
|
77,996
|
$
|
4,700
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
||||||||
|
(in thousands)
|
|
2024
|
2023
|
2024
|
2023
|
||||
|
Current income tax expense (recovery) related to LTIs - common shares held
|
|
$
|
(481)
|
$
|
-
|
$
|
3,709
|
$
|
-
|
|
Deferred income tax expense (recovery) related to LTIs - common shares held
|
|
|
1,134
|
|
(5,115)
|
|
(1,632)
|
|
(7,205)
|
|
Income tax expense (recovery) recognized in OCI
|
|
$
|
653
|
$
|
(5,115)
|
$
|
2,077
|
$
|
(7,205)
|
|
Three Months Ended
September 30 |
Nine Months Ended
September 30 |
||||||||
|
(in thousands)
|
|
2024
|
2023
|
2024
|
2023
|
||||
|
Earnings before income taxes
|
$
|
182,146
|
$
|
121,516
|
$
|
518,989
|
$
|
373,909
|
|
|
Canadian federal and provincial income tax rates
|
|
|
27.00%
|
|
27.00%
|
|
27.00%
|
|
27.00%
|
|
Income tax expense (recovery) based on above rates
|
$
|
49,179
|
$
|
32,809
|
$
|
140,127
|
$
|
100,955
|
|
|
Non-deductible stock based compensation and other
|
|
318
|
490
|
|
1,088
|
1,376
|
|||
|
Differences in tax rates in foreign jurisdictions 1
|
|
(50,007)
|
(33,481)
|
|
(140,584)
|
(102,419)
|
|||
|
Global minimum tax expense
|
|
27,851
|
-
|
|
78,361
|
-
|
|||
|
Current period unrecognized temporary differences
|
|
695
|
636
|
|
1,240
|
1,043
|
|||
|
Write down (reversal of write down) or recognition of prior period temporary differences
|
|
|
(525)
|
|
4,691
|
|
(2,236)
|
|
3,745
|
|
Total income tax expense (recovery) recognized in net earnings
|
|
$
|
27,511
|
$
|
5,145
|
$
|
77,996
|
$
|
4,700
|
|
Effective Tax Rate
|
|
|
15%
|
|
4%
|
|
15%
|
|
1%
|
| 1) |
During the nine months ended September 30, 2024, the Company's subsidiaries generated net earnings of $523 million, as compared to $381 million during the comparable period of the prior year.
|
|
(in thousands)
|
Taxes (Payable)
Receivable
|
|
Income taxes receivable - December 31, 2023
|
$ 5,935
|
|
Current income tax recovery - income statement
|
2,029
|
|
Global minimum income tax expense
|
(78,361)
|
|
Current income tax expense - statement of OCI
|
(3,709)
|
|
Income taxes paid
|
(2,734)
|
|
Foreign exchange adjustments
|
(129)
|
|
Income taxes payable - September 30, 2024
|
$ (76,969)
|
|
Comprised of:
|
|
|
Current income taxes receivable
|
$ 1,392
|
|
Non-current global minimum income tax payable
|
(78,361)
|
|
Income taxes payable - September 30, 2024
|
$ (76,969)
|
|
Nine Months Ended September 30, 2024
|
||||||||
|
Opening Balance
|
Recovery (Expense) Recognized In Net Earnings
|
Recovery (Expense) Recognized In OCI
|
Closing
Balance |
|||||
|
Recognized deferred income tax assets and liabilities
|
||||||||
|
Deferred tax assets
|
|
|
|
|
|
|
|
|
|
Non-capital loss carryforward 1
|
$
|
810
|
$
|
(810)
|
$
|
-
|
$
|
-
|
|
Capital loss carryforward
|
|
956
|
|
(317)
|
|
(639)
|
|
-
|
|
Other 2
|
|
4,135
|
|
(778)
|
|
-
|
|
3,357
|
|
Deferred tax liabilities
|
|
|
|
|
|
|
|
|
|
Debt financing fees 3
|
|
(818)
|
|
13
|
|
-
|
|
(805)
|
|
Unrealized gains on long-term investments
|
|
(4,415)
|
|
703
|
|
2,271
|
|
(1,441)
|
|
Mineral stream interests 4
|
|
(668)
|
|
(443)
|
|
-
|
|
(1,111)
|
|
Foreign withholding tax
|
|
(232)
|
|
(32)
|
|
-
|
|
(264)
|
|
Total
|
$
|
(232)
|
$
|
(1,664)
|
$
|
1,632
|
$
|
(264)
|
| 1) |
As at September 30, 2024, the Company had no non-capital losses available to recognize against deferred tax liabilities.
|
| 2) |
Other includes capital assets, PSU and pension liabilities.
|
| 3) |
Debt and share financing fees are deducted over a five-year period for Canadian income tax purposes. For accounting purposes, debt financing fees are deducted over the term of the credit facility and share financing
fees are charged directly to issued capital.
|
| 4) |
The Company’s position, as reflected in its filed Canadian income tax returns and consistent with the terms of the PMPAs, is that the cost of the precious metal acquired under the Canadian PMPAs is equal to the
market value while a deposit is outstanding (where applicable to an agreement), and the cash cost thereafter. For accounting purposes, the cost of the mineral stream interests is depleted on a unit-of-production basis as described in Note 12.
|
|
Year Ended December 31, 2023
|
||||||||
|
Opening Balance
|
Recovery (Expense) Recognized In Net Earnings
|
Recovery (Expense) Recognized In OCI
|
Closing
Balance |
|||||
|
Recognized deferred income tax assets and liabilities
|
||||||||
|
Deferred tax assets
|
||||||||
|
Non-capital loss carryforward
|
$
|
-
|
$
|
810
|
$
|
-
|
$
|
810
|
|
Capital loss carryforward
|
792
|
40
|
124
|
956
|
||||
|
Other
|
4,256
|
(121)
|
-
|
4,135
|
||||
|
Deferred tax liabilities
|
||||||||
|
Debt and share financing fees
|
(774)
|
(44)
|
-
|
(818)
|
||||
|
Unrealized gains on long-term investments
|
(8,006)
|
(4)
|
3,595
|
(4,415)
|
||||
|
Mineral stream interests
|
3,732
|
(4,400)
|
-
|
(668)
|
||||
|
Foreign withholding tax
|
|
(165)
|
|
(67)
|
-
|
|
(232)
|
|
|
Total
|
$
|
(165)
|
$
|
(3,786)
|
$
|
3,719
|
$
|
(232)
|
|
September 30
|
December 31
|
||||
|
(in thousands)
|
|
2024
|
2023
|
||
|
Mineral stream interests
|
$
|
6,791
|
$
|
8,804
|
|
|
Other
|
|
3,462
|
2,376
|
||
|
Unrealized losses on long-term investments
|
|
11,331
|
12,912
|
||
|
Total
|
|
$
|
21,584
|
$
|
24,092
|
| 1) |
As at September 30, 2024, the Company had fully recognized the tax effect of non-capital losses.
|
| 23. |
Other Current Assets
|
|
September 30
|
December 31
|
||||
|
(in thousands)
|
Note
|
2024
|
2023
|
||
|
Prepaid expenses
|
$
|
3,177
|
$
|
2,628
|
|
|
Other
|
|
|
761
|
|
871
|
|
Total other current assets
|
|
$
|
3,938
|
$
|
3,499
|
| 24. |
Other Long-Term Assets
|
|
September 30
|
December 31
|
||||
|
(in thousands)
|
Note
|
2024
|
2023
|
||
|
Intangible assets
|
$
|
1,599
|
$
|
1,886
|
|
|
Debt issue costs - Revolving Facility
|
16.1
|
|
5,446
|
5,496
|
|
|
Refundable deposit - 777 PMPA
|
|
9,238
|
8,717
|
||
|
Subscription Rights
|
|
-
|
4,510
|
||
|
Other
|
|
|
5,797
|
|
5,861
|
|
Total other long-term assets
|
|
$
|
22,080
|
$
|
26,470
|
| 25. |
Commitments and Contingencies
|
|
Mineral Stream Interests
|
Attributable
Payable Production
to be Purchased
|
Per Ounce Cash
Payment 1
|
Term of
Agreement |
Date of
Original Contract |
|
|
Constancia
|
50%
|
$
|
425 ²
|
Life of Mine
|
8-Aug-12
|
|
Salobo
|
75%
|
$
|
425
|
Life of Mine
|
28-Feb-13
|
|
Sudbury
|
70%
|
$
|
400
|
20 years
|
28-Feb-13
|
|
San Dimas
|
variable ³
|
$
|
637
|
Life of Mine
|
10-May-18
|
|
Stillwater
|
100%
|
|
18% ⁴
|
Life of Mine
|
16-Jul-18
|
|
Marathon
|
100% ⁵
|
|
18% ⁴
|
Life of Mine
|
26-Jan-22
|
|
Other
|
|
|
|
|
|
|
Minto
|
100% ⁶
|
|
50% ⁶
|
Life of Mine
|
20-Nov-08
|
|
Copper World
|
100%
|
$
|
450
|
Life of Mine
|
10-Feb-10
|
|
Marmato
|
10.5% ⁵
|
|
18% ⁴
|
Life of Mine
|
5-Nov-20
|
|
Santo Domingo
|
100% ⁵
|
|
18% ⁴
|
Life of Mine
|
24-Mar-21
|
|
Fenix
|
6% ⁵
|
|
20% ⁵
|
Life of Mine
|
15-Nov-21
|
|
Blackwater
|
8% ⁵
|
|
35%
|
Life of Mine
|
13-Dec-21
|
|
Curipamba
|
50% ⁵
|
|
18% ⁴
|
Life of Mine
|
17-Jan-22
|
|
Goose
|
2.78% ⁵
|
|
18% ⁴
|
Life of Mine
|
8-Feb-22
|
|
Cangrejos
|
6.6% ⁵
|
|
18% ⁴
|
Life of Mine
|
16-May-23
|
|
Platreef
|
62.5% ⁵
|
$
|
100 ⁵
|
Life of Mine ⁵
|
7-Dec-21 ⁸
|
|
Curraghinalt
|
3.05% ⁵
|
|
18% ⁴
|
Life of Mine
|
15-Nov-23
|
|
Kudz Ze Kayah
|
6.875% ⁷
|
|
20%
|
Life of Mine
|
22-Dec-21 ⁸
|
|
Early Deposit
|
|
|
|
|
|
|
Toroparu
|
10%
|
$
|
400
|
Life of Mine
|
11-Nov-13
|
|
Cotabambas
|
25% ⁵
|
$
|
450
|
Life of Mine
|
21-Mar-16
|
|
Kutcho
|
100%
|
|
20%
|
Life of Mine
|
14-Dec-17
|
| 1) |
The production payment is measured as either a fixed amount per ounce of gold delivered, or as a percentage of the spot price of gold on the date of delivery. Contracts where the payment is a fixed amount per ounce
of gold delivered are subject to an annual inflationary increase, with the exception of Sudbury. Additionally, should the prevailing market price for gold be lower than this fixed amount, the per ounce cash payment will be reduced to the
prevailing market price, subject to an annual inflationary factor.
|
| 2) |
Subject to an increase to $550 per ounce of gold after the initial 40-year term.
|
| 3) |
Under the terms of the San Dimas PMPA, the Company is entitled to an amount equal to 25% of the payable gold production plus an additional amount of gold equal to 25% of the payable silver production converted to
gold at a fixed gold to silver exchange ratio of 70:1 from the San Dimas mine. If the average gold to silver price ratio decreases to less than 50:1 or increases to more than 90:1 for a period of 6 months or more, then the "70" shall be
revised to "50" or "90", as the case may be, until such time as the average gold to silver price ratio is between 50:1 to 90:1 for a period of 6 months or more in which event the "70" shall be reinstated. Currently, the fixed gold to silver
exchange ratio is 70:1.
|
| 4) |
To be increased to 22% once the market value of all metals delivered to Wheaton, net of the per ounce cash payment, exceeds the initial upfront cash deposit.
|
| 5) |
Under certain PMPAs, the Company’s attributable gold percentage will be reduced once certain thresholds are achieved:
|
| a. |
Marathon – reduced to 67% once the Company has received 150,000 ounces of gold.
|
| b. |
Marmato – reduced to 5.25% once Wheaton has received 310,000 ounces of gold.
|
| c. |
Santo Domingo – reduced to 67% once the Company has received 285,000 ounces of gold.
|
| d. |
Fenix – reduced to 4% once the Company has received 90,000 ounces of gold, with a further reduction to 3.5% once the Company has received 140,000 ounces. Please see Note 27 for more information.
|
| e. |
Blackwater – reduced to 4% once the Company has received 464,000 ounces of gold.
|
| f. |
Curipamba – reduced to 33% once the Company has received 145,000 ounces of gold.
|
| g. |
Goose – reduced to 1.44% once the Company has received 87,100 ounces of gold, with a further reduction to 1% once the Company has received 134,000 ounces.
|
| h. |
Cangrejos – reduced to 4.4% once the Company has received 700,000 ounces of gold.
|
| i. |
Platreef - reduced to 50% once the Company has received 218,750 ounces of gold, with a further reduction to 3.125% once the Company has received 428,300 ounces, at which point the per ounce cash payment increases to
80% of the spot price of gold. If certain thresholds are met, including if production through the Platreef project concentrator achieves 5.5 Mtpa, the 3.125% residual gold stream will terminate.
|
| j. |
Curraghinalt – reduced to 1.5% once the Company has received 125,000 ounces of gold.
|
| k. |
Cotabambas – reduced to 16.67% once the Company has received 90 million silver equivalent ounces.
|
| 6) |
The Company is committed to acquire 100% of the first 30,000 ounces of gold produced per annum and 50% thereafter. On May 13, 2023, Minto Metals Corp., announced the suspension of operations at the Minto mine.
|
| 7) |
Under the Kudz Ze Kayah PMPA, the Company will be entitled to purchase staged percentages of produced gold ranging from 6.875% to 7.375% until 330,000 ounces of gold are produced and delivered, thereafter reducing
to a range of 5.625% to 6.125% until a further 59,800 ounces of gold are produced and delivered, further reducing to a range of 5% to 5.5% until a further 270,200 ounces of gold are produced and delivered for a total of 660,000 ounces of gold
thereafter ranging between 6.25% and 6.75%.
|
| 8) |
On February 27, 2024, the Company closed the Orion Purchase Agreement to acquire the Platreef and Kudz Ze Kayah PMPAs.
|
|
Mineral Stream Interests
|
Attributable
Payable Production
to be Purchased
|
Per Ounce Cash
Payment 1
|
Term of
Agreement |
Date of
Original Contract |
|
|
Peñasquito
|
25%
|
$
|
4.50
|
Life of Mine
|
24-Jul-07
|
|
Constancia
|
100%
|
$
|
6.26 ²
|
Life of Mine
|
8-Aug-12
|
|
Antamina
|
33.75%
|
|
20%
|
Life of Mine
|
3-Nov-15
|
|
Other
|
|
|
|
|
|
|
Los Filos
|
100%
|
$
|
4.68
|
25 years
|
15-Oct-04
|
|
Zinkgruvan
|
100%
|
$
|
4.68
|
Life of Mine
|
8-Dec-04
|
|
Stratoni
|
100%
|
$
|
11.54
|
Life of Mine
|
23-Apr-07
|
|
Neves-Corvo
|
100%
|
$
|
4.50
|
50 years
|
5-Jun-07
|
|
Aljustrel
|
100% ³
|
|
50%
|
50 years
|
5-Jun-07
|
|
Minto
|
100% ⁴
|
$
|
4.39
|
Life of Mine
|
20-Nov-08
|
|
Pascua-Lama
|
25%
|
$
|
3.90
|
Life of Mine
|
8-Sep-09
|
|
Copper World
|
100%
|
$
|
3.90
|
Life of Mine
|
10-Feb-10
|
|
Loma de La Plata
|
12.5%
|
$
|
4.00
|
Life of Mine
|
n/a ⁵
|
|
Marmato
|
100% ⁶
|
|
18% ⁷
|
Life of Mine
|
5-Nov-20
|
|
Cozamin
|
50% ⁶
|
|
10%
|
Life of Mine
|
11-Dec-20
|
|
Blackwater
|
50% ⁶
|
|
18% ⁷
|
Life of Mine
|
13-Dec-21
|
|
Curipamba
|
75%
|
|
18% ⁷
|
Life of Mine
|
17-Jan-22
|
|
Mineral Park
|
100%
|
|
18% ⁷
|
Life of Mine
|
24-Oct-23
|
|
Kudz Ze Kayah
|
6.875 ⁸
|
|
20%
|
Life of Mine
|
22-Dec-21 ⁹
|
|
Early Deposit
|
|
|
|
|
|
|
Toroparu
|
50%
|
$
|
3.90
|
Life of Mine
|
11-Nov-13
|
|
Cotabambas
|
100% ⁶
|
$
|
5.90
|
Life of Mine
|
21-Mar-16
|
|
Kutcho
|
100%
|
|
20%
|
Life of Mine
|
14-Dec-17
|
| 1) |
The production payment is measured as either a fixed amount per unit of silver delivered, or as a percentage of the spot price of silver on the date of delivery. Contracts where the payment is a fixed amount per
ounce of silver delivered are subject to an annual inflationary increase, with the exception of Loma de La Plata. Additionally, should the prevailing market price for silver be lower than this fixed amount, the per ounce cash payment will be
reduced to the prevailing market price, subject to an annual inflationary factor.
|
| 2) |
Subject to an increase to $9.90 per ounce of silver after the initial 40-year term.
|
| 3) |
Wheaton only has the rights to silver contained in concentrate containing less than 15% copper at the Aljustrel mine. On September 12, 2023, it was announced that the production of the zinc and lead concentrates at
the Aljustrel mine will be halted from September 24, 2023 until the second quarter of 2025.
|
| 4) |
On May 13, 2023, Minto Metals Corp. announced the suspension of operations at the Minto mine.
|
| 5) |
Terms of the agreement not yet finalized.
|
| 6) |
Under certain PMPAs, the Company’s attributable silver percentage will be reduced once certain thresholds are achieved:
|
| a. |
Marmato – reduced to 50% once the Company has received 2.15 million ounces of silver.
|
| b. |
Cozamin – reduced to 33% once the Company has received 10 million ounces of silver.
|
| c. |
Blackwater – reduced to 33% once the Company has received 17.8 million ounces of silver.
|
| d. |
Cotabambas – reduced to 66.67% once the Company has received 90 million silver equivalent ounces.
|
| 7) |
To be increased to 22% once the total market value of all metals delivered to the Company, net of the per ounce cash payment, exceeds the initial upfront cash deposit.
|
| 8) |
Under the Kudz Ze Kayah PMPA, the Company will be entitled to purchase: staged percentages of produced silver ranging from 6.875% to 7.375% until 43.30 million ounces of silver are produced and delivered, thereafter
reducing to a range of 5.625% to 6.125% until a further 7.96 million ounces of silver are produced and delivered, further reducing to a range of 5% to 5.5% until a further 35.34 million ounces of silver are produced and delivered for a total
of 86.6 million ounces of silver and thereafter ranging between 6.25% and 6.75%.
|
| 9) |
On February 27, 2024, the Company closed the Orion Purchase Agreement to acquire the Platreef and Kudz Ze Kayah PMPAs.
|
|
Mineral Stream Interests
|
Attributable
Payable Production
to be Purchased
|
Per Unit of
Measurement Cash
Payment 1
|
Term of
Agreement |
Date of
Original Contract |
|
|
Palladium
|
|
|
|
|
|
|
Stillwater
|
4.5% ²
|
|
18% ³
|
Life of Mine
|
16-Jul-18
|
|
Platreef
|
5.25% ²
|
|
30% ²
|
Life of Mine ²
|
7-Dec-21 ⁴
|
|
Platinum
|
|
|
|
|
|
|
Marathon
|
22% ²
|
|
18% ³
|
Life of Mine
|
26-Jan-22
|
|
Platreef
|
5.25% ²
|
|
30% ²
|
Life of Mine ²
|
7-Dec-21 ⁴
|
|
Cobalt
|
|
|
|
|
|
|
Voisey's Bay
|
42.4% ²
|
|
18% ³
|
Life of Mine
|
11-Jun-18
|
| 1) |
The production payment is measured as either a fixed amount per unit of metal delivered, or as a percentage of the spot price of the underlying metal on the date of delivery.
|
| 2) |
Under certain PMPAs, the Company’s attributable metal percentage will be reduced once certain thresholds are achieved:
|
| a. |
Stillwater – reduced to 2.25% once the Company has received 375,000 ounces of palladium, with a further reduction to 1% once the Company has received 550,000 ounces.
|
| b. |
Platreef – reduced to 3% once the Company has received 350,000 ounces of combined palladium and platinum, with a further reduction to 0.1% once the Company has received a combined 485,115 ounces, at which point the
per ounce cash payment increases to 80% of the spot price of palladium and platinum. If certain thresholds are met, including if production through the Platreef project concentrator achieves 5.5 Mtpa, the 0.1% residual palladium and platinum
stream will terminate.
|
| c. |
Marathon – reduced to 15% once the Company has received 120,000 ounces of platinum.
|
| d. |
Voisey’s Bay – reduced to 21.2% once the Company has received 31 million pounds of cobalt.
|
| 3) |
To be increased to 22% once the market value of all metals delivered to Wheaton, net of the per unit cash payment, exceeds the initial upfront cash deposit.
|
| 4) |
On February 27, 2024, the Company closed the Orion Purchase Agreement to acquire the Platreef and Kudz Ze Kayah PMPAs.
|
|
Projected Payment Dates 1
|
||||||||||||||
|
(in thousands)
|
2024
|
2025 - 2026
|
2027 - 2028
|
After 2028
|
Total
|
|||||||||
|
Payments for mineral stream interests & royalty
|
|
|
|
|||||||||||
|
Salobo 2
|
$
|
163,000
|
$
|
-
|
$
|
16,000
|
$
|
64,000
|
|
$
|
243,000
|
|||
|
Copper World 3
|
-
|
131,429
|
99,721
|
-
|
|
|
231,150
|
|||||||
|
Marmato
|
40,016
|
81,984
|
-
|
-
|
|
|
122,000
|
|||||||
|
Santo Domingo
|
-
|
162,500
|
97,500
|
-
|
|
|
260,000
|
|||||||
|
Fenix Gold
|
-
|
25,000
|
-
|
-
|
|
|
25,000
|
|||||||
|
Curipamba
|
250
|
162,000
|
-
|
-
|
|
|
162,250
|
|||||||
|
Marathon
|
-
|
59,264
|
88,895
|
-
|
|
|
148,159
|
|||||||
|
Cangrejos
|
9,100
|
126,000
|
126,000
|
-
|
|
|
261,100
|
|||||||
|
Curraghinalt
|
-
|
55,000
|
-
|
-
|
|
|
55,000
|
|||||||
|
Loma de La Plata
|
-
|
-
|
-
|
32,400
|
|
|
32,400
|
|||||||
|
Mineral Park
|
25,000
|
40,000
|
-
|
-
|
|
|
65,000
|
|||||||
|
Kudz Ze Kayah
|
-
|
5,000
|
-
|
-
|
|
|
5,000
|
|||||||
|
Payments for early deposit mineral stream interest
|
|
|
|
|||||||||||
|
Cotabambas
|
-
|
-
|
-
|
126,000
|
|
|
126,000
|
|||||||
|
Toroparu
|
-
|
-
|
-
|
138,000
|
|
|
138,000
|
|||||||
|
Kutcho
|
-
|
-
|
-
|
58,000
|
|
|
58,000
|
|||||||
|
Leases liabilities
|
|
222
|
|
|
1,186
|
|
|
1,311
|
|
|
4,673
|
|
|
7,392
|
|
Total contractual obligations
|
$
|
237,588
|
|
$
|
849,363
|
|
$
|
429,427
|
|
$
|
423,073
|
|
$
|
1,939,451
|
| 1) |
Projected payment date based on management estimate. Dates may be updated in the future as additional information is received.
|
| 2) |
As more fully explained below, the expansion payment relative to the Salobo III expansion project is dependent on the timing and size of the throughput expansion.
|
| 3) |
Figure includes contingent transaction costs of $1 million.
|
| 26. |
Segmented Information
|
|
Three Months Ended September 30, 2024
|
||||||||||||
|
|
Sales
|
Cost
of Sales |
Depletion
|
Net
Earnings |
Cash Flow
From Operations |
Total
Assets |
||||||
|
(in thousands)
|
||||||||||||
|
Gold
|
||||||||||||
|
Salobo
|
$
|
144,656
|
$
|
24,670
|
$
|
21,970
|
$
|
98,016
|
$
|
122,916
|
$
|
2,616,346
|
|
Sudbury 1
|
6,286
|
998
|
3,309
|
1,979
|
4,798
|
246,918
|
||||||
|
Constancia
|
12,912
|
2,190
|
1,674
|
9,048
|
10,722
|
70,095
|
||||||
|
San Dimas
|
17,482
|
4,472
|
2,035
|
10,975
|
13,010
|
138,507
|
||||||
|
Stillwater
|
4,071
|
716
|
688
|
2,667
|
3,355
|
208,474
|
||||||
|
Other 2
|
|
3,114
|
|
1,939
|
|
289
|
|
886
|
|
2,874
|
|
901,880
|
|
Total gold interests
|
$
|
188,521
|
$
|
34,985
|
$
|
29,965
|
$
|
123,571
|
$
|
157,675
|
$
|
4,182,220
|
|
Silver
|
||||||||||||
|
Peñasquito
|
$
|
49,329
|
$
|
7,504
|
$
|
8,100
|
$
|
33,725
|
$
|
41,825
|
$
|
253,461
|
|
Antamina
|
29,257
|
5,997
|
8,367
|
14,893
|
23,260
|
498,029
|
||||||
|
Constancia
|
10,822
|
2,279
|
2,233
|
6,310
|
8,543
|
170,242
|
||||||
|
Other 3
|
|
25,741
|
|
3,705
|
|
4,124
|
|
17,912
|
|
22,594
|
|
645,485
|
|
Total silver interests
|
$
|
115,149
|
$
|
19,485
|
$
|
22,824
|
$
|
72,840
|
$
|
96,222
|
$
|
1,567,217
|
|
Palladium
|
||||||||||||
|
Stillwater
|
$
|
3,644
|
$
|
650
|
$
|
1,614
|
$
|
1,380
|
$
|
2,994
|
$
|
215,082
|
|
Platreef
|
|
-
|
|
-
|
|
-
|
|
-
|
|
-
|
|
78,820
|
|
Total palladium interests
|
$
|
3,644
|
$
|
650
|
$
|
1,614
|
$
|
1,380
|
$
|
2,994
|
$
|
293,902
|
|
Platinum
|
||||||||||||
|
Marathon
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
9,451
|
|
Platreef
|
|
-
|
|
-
|
|
-
|
|
-
|
|
-
|
|
57,588
|
|
Total platinum interests
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
67,039
|
|
Cobalt
|
||||||||||||
|
Voisey's Bay
|
$
|
939
|
$
|
190
|
$
|
1,127
|
$
|
(378)
|
$
|
321
|
$
|
345,745
|
|
Total mineral stream interests
|
$
|
308,253
|
$
|
55,310
|
$
|
55,530
|
$
|
197,413
|
$
|
257,212
|
$
|
6,456,123
|
|
Other
|
||||||||||||
|
General and administrative
|
$
|
(9,488)
|
$
|
(6,215)
|
||||||||
|
Share based compensation
|
(9,628)
|
-
|
||||||||||
|
Donations and community investments
|
(2,352)
|
(2,198)
|
||||||||||
|
Finance costs
|
(1,404)
|
(1,051)
|
||||||||||
|
Other
|
7,605
|
3,664
|
||||||||||
|
Income tax
|
|
|
|
|
|
|
|
(27,511)
|
|
2,925
|
|
|
|
Total other
|
|
|
|
|
|
|
$
|
(42,778)
|
$
|
(2,875)
|
$
|
930,056
|
|
Consolidated
|
|
|
|
|
|
|
$
|
154,635
|
$
|
254,337
|
$
|
7,386,179
|
| 1) |
Comprised of the operating Coleman, Copper Cliff, Garson, Creighton and Totten gold interests as well as the non-operating Stobie and Victor gold interests.
|
| 2) |
Where a gold interest represents less than 10% of the Company’s sales, gross margin or aggregate asset book value and is not evaluated on a regular basis by the Company’s CEO for the purpose of assessing
performance, the gold interest has been summarized under Other gold interests. Other gold interests comprised of the operating Marmato gold interest as well as the non-operating Minto, Copper World, Santo Domingo, Fenix, Blackwater,
Curipamba, Marathon, Goose, Cangrejos, Platreef, Curraghinalt and Kudz Ze Kayah gold interests.
|
| 3) |
Where a silver interest represents less than 10% of the Company’s sales, gross margin or aggregate asset book value and is not evaluated on a regular basis by the Company’s CEO for the purpose of assessing
performance, the silver interest has been summarized under Other silver interests. Other silver interests comprised of the operating Los Filos, Zinkgruvan, Neves-Corvo, Marmato and Cozamin silver interests as well as the non-operating
Stratoni, Aljustrel, Minto, Pascua-Lama, Copper World, Navidad, Blackwater, Curipamba, Mineral Park and Kudz Ze Kayah silver interests.
|
|
Three Months Ended September 30, 2023
|
||||||||||||
|
Sales
|
Cost
of Sales |
Depletion
|
Net
Earnings |
Cash Flow
From Operations |
Total
Assets |
|||||||
|
(in thousands)
|
||||||||||||
|
Gold
|
||||||||||||
|
Salobo
|
$
|
86,395
|
$
|
18,684
|
$
|
14,685
|
$
|
53,026
|
$
|
67,710
|
$
|
2,341,485
|
|
Sudbury 1
|
9,428
|
1,934
|
5,825
|
1,669
|
7,494
|
268,224
|
||||||
|
Constancia
|
24,102
|
5,197
|
3,914
|
14,991
|
18,906
|
86,555
|
||||||
|
San Dimas
|
18,846
|
6,114
|
2,516
|
10,216
|
12,732
|
147,638
|
||||||
|
Stillwater
|
3,859
|
692
|
1,013
|
2,154
|
3,167
|
212,650
|
||||||
|
Other 2
|
|
2,077
|
|
393
|
|
418
|
|
1,266
|
|
1,684
|
|
557,035
|
|
Total gold interests
|
$
|
144,707
|
$
|
33,014
|
$
|
28,371
|
$
|
83,322
|
$
|
111,693
|
$
|
3,613,587
|
|
Silver
|
||||||||||||
|
Peñasquito
|
$
|
10,804
|
$
|
2,009
|
$
|
1,843
|
$
|
6,952
|
$
|
8,795
|
$
|
278,028
|
|
Antamina
|
18,915
|
3,817
|
5,602
|
9,496
|
15,097
|
527,227
|
||||||
|
Constancia
|
10,360
|
2,686
|
2,716
|
4,958
|
7,674
|
183,736
|
||||||
|
Other 3
|
|
30,293
|
|
6,609
|
|
3,383
|
|
20,301
|
|
19,439
|
|
549,641
|
|
Total silver interests
|
$
|
70,372
|
$
|
15,121
|
$
|
13,544
|
$
|
41,707
|
$
|
51,005
|
$
|
1,538,632
|
|
Palladium
|
||||||||||||
|
Stillwater
|
$
|
5,307
|
$
|
946
|
$
|
1,945
|
$
|
2,416
|
$
|
4,361
|
$
|
222,154
|
|
Platinum
|
||||||||||||
|
Marathon
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
9,450
|
|
Cobalt
|
||||||||||||
|
Voisey's Bay
|
$
|
2,751
|
$
|
727
|
$
|
2,575
|
$
|
(551)
|
$
|
4,235
|
$
|
353,631
|
|
Total mineral stream interests
|
$
|
223,137
|
$
|
49,808
|
$
|
46,435
|
$
|
126,894
|
$
|
171,294
|
$
|
5,737,454
|
|
Other
|
||||||||||||
|
General and administrative
|
$
|
(8,606)
|
$
|
(6,321)
|
||||||||
|
Share based compensation
|
(4,336)
|
-
|
||||||||||
|
Donations and community investments
|
(1,736)
|
(1,750)
|
||||||||||
|
Finance costs
|
(1,407)
|
(1,078)
|
||||||||||
|
Other
|
10,707
|
9,870
|
||||||||||
|
Income tax
|
|
|
|
|
|
|
|
(5,145)
|
|
(912)
|
|
|
|
Total other
|
|
|
|
|
|
|
$
|
(10,523)
|
$
|
(191)
|
$
|
1,144,061
|
|
Consolidated
|
|
|
|
|
|
|
$
|
116,371
|
$
|
171,103
|
$
|
6,881,515
|
| 1) |
Comprised of the operating Coleman, Copper Cliff, Garson, Creighton and Totten gold interests as well as the non-operating Stobie and Victor gold interests.
|
| 2) |
Where a gold interest represents less than 10% of the Company’s sales, gross margin or aggregate asset book value and is not evaluated on a regular basis by the Company’s CEO for the purpose of assessing
performance, the gold interest has been summarized under Other gold interests. Other gold interests are comprised of the operating Marmato gold interests as well as the non-operating Minto, 777, Copper World, Santo Domingo, Fenix, Blackwater,
Marathon, Curipamba, Goose and Cangrejos gold interests. On June 22, 2022, Hudbay announced that mining activities at 777 have concluded and closure activities have commenced. On May 13, 2023, Minto announced the suspension of operations at
the Minto mine.
|
| 3) |
Where a silver interest represents less than 10% of the Company’s sales, gross margin or aggregate asset book value and is not evaluated on a regular basis by the Company’s CEO for the purpose of assessing
performance, the silver interest has been summarized under Other silver interests. Other silver interests comprised of the operating Los Filos, Zinkgruvan, Neves-Corvo, Aljustrel, Cozamin and Marmato silver interests and the non-operating
Minto, 777, Loma de La Plata, Stratoni, Pascua-Lama, Copper World, Blackwater and Curipamba silver interests. On June 22, 2022, Hudbay announced that mining activities at 777 have concluded and closure activities have commenced. On May 13,
2023, Minto announced the suspension of operations at the Minto mine. On September 12, 2023, it was announced that the production of zinc and lead concentrates at Aljustrel will be halted from September 24, 2023 until the second quarter of
2025.
|
|
Nine Months Ended September 30, 2024
|
||||||||||||
|
Sales
|
Cost
of Sales |
Depletion
|
Net
Earnings |
Cash Flow
From Operations |
Total
Assets |
|||||||
|
(in thousands)
|
||||||||||||
|
Gold
|
||||||||||||
|
Salobo
|
$
|
391,973
|
$
|
72,142
|
$
|
65,073
|
$
|
254,758
|
$
|
322,761
|
$
|
2,616,346
|
|
Sudbury 1
|
28,130
|
4,921
|
15,567
|
7,642
|
22,718
|
246,918
|
||||||
|
Constancia
|
70,275
|
13,442
|
10,170
|
46,663
|
56,833
|
70,095
|
||||||
|
San Dimas
|
49,950
|
13,794
|
6,215
|
29,941
|
36,156
|
138,507
|
||||||
|
Stillwater
|
15,144
|
2,680
|
2,995
|
9,469
|
12,464
|
208,474
|
||||||
|
Other 2
|
|
5,888
|
|
2,434
|
|
950
|
|
2,504
|
|
5,153
|
|
901,880
|
|
Total gold interests
|
$
|
561,360
|
$
|
109,413
|
$
|
100,970
|
$
|
350,977
|
$
|
456,085
|
$
|
4,182,220
|
|
Silver
|
||||||||||||
|
Peñasquito
|
$
|
135,578
|
$
|
22,446
|
$
|
22,771
|
$
|
90,361
|
$
|
113,132
|
$
|
253,461
|
|
Antamina
|
73,710
|
14,832
|
21,501
|
37,377
|
58,878
|
498,029
|
||||||
|
Constancia
|
40,180
|
9,395
|
9,341
|
21,444
|
30,785
|
170,242
|
||||||
|
Other 3
|
|
73,630
|
|
11,138
|
|
11,707
|
|
50,785
|
|
60,026
|
|
645,485
|
|
Total silver interests
|
$
|
323,098
|
$
|
57,811
|
$
|
65,320
|
$
|
199,967
|
$
|
262,821
|
$
|
1,567,217
|
|
Palladium
|
||||||||||||
|
Stillwater
|
$
|
12,531
|
$
|
2,272
|
$
|
5,585
|
$
|
4,674
|
$
|
10,259
|
$
|
215,082
|
|
Platreef
|
|
-
|
|
-
|
|
-
|
|
-
|
|
-
|
|
78,820
|
|
Total palladium interests
|
$
|
12,531
|
$
|
2,272
|
$
|
5,585
|
$
|
4,674
|
$
|
10,259
|
$
|
293,902
|
|
Platinum
|
||||||||||||
|
Marathon
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
9,451
|
|
Platreef
|
|
-
|
|
-
|
|
-
|
|
-
|
|
-
|
|
57,588
|
|
Total platinum interests
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
67,039
|
|
Cobalt
|
||||||||||||
|
Voisey's Bay
|
$
|
7,134
|
$
|
1,376
|
$
|
6,196
|
$
|
(438)
|
$
|
9,407
|
$
|
345,745
|
|
Total mineral stream interests
|
$
|
904,123
|
$
|
170,872
|
$
|
178,071
|
$
|
555,180
|
$
|
738,572
|
$
|
6,456,123
|
|
Other
|
||||||||||||
|
General and administrative
|
$
|
(30,193)
|
$
|
(31,134)
|
||||||||
|
Share based compensation
|
(17,150)
|
(11,129)
|
||||||||||
|
Donations and community investments
|
(4,626)
|
(4,185)
|
||||||||||
|
Finance costs
|
(4,144)
|
(3,234)
|
||||||||||
|
Other
|
19,922
|
16,486
|
||||||||||
|
Income tax
|
|
|
|
|
|
|
|
(77,996)
|
|
2,734
|
|
|
|
Total other
|
|
|
|
|
|
|
$
|
(114,187)
|
$
|
(30,462)
|
$
|
930,056
|
|
Consolidated
|
|
|
|
|
|
|
$
|
440,993
|
$
|
708,110
|
$
|
7,386,179
|
| 1) |
Comprised of the operating Coleman, Copper Cliff, Garson, Creighton and Totten gold interests as well as the non-operating Stobie and Victor gold interests.
|
| 2) |
Where a gold interest represents less than 10% of the Company’s sales, gross margin or aggregate asset book value and is not evaluated on a regular basis by the Company’s CEO for the purpose of assessing
performance, the gold interest has been summarized under Other gold interests. Other gold interests comprised of the operating Marmato gold interest as well as the non-operating Minto, Copper World, Santo Domingo, Fenix, Blackwater,
Curipamba, Marathon, Goose, Cangrejos, Platreef, Curraghinalt and Kudz Ze Kayah gold interests.
|
| 3) |
Where a silver interest represents less than 10% of the Company’s sales, gross margin or aggregate asset book value and is not evaluated on a regular basis by the Company’s CEO for the purpose of assessing
performance, the silver interest has been summarized under Other silver interests. Other silver interests comprised of the operating Los Filos, Zinkgruvan, Neves-Corvo, Marmato and Cozamin silver interests as well as the non-operating
Stratoni, Aljustrel, Minto, Pascua-Lama, Copper World, Navidad, Blackwater, Curipamba, Mineral Park and Kudz Ze Kayah silver interests.
|
|
Nine Months Ended September 30, 2023
|
||||||||||||||
|
Sales
|
Cost
of Sales |
Depletion
|
Gain on Disposal 1
|
Net
Earnings (Loss) |
Cash Flow From Operations
|
Total
Assets |
||||||||
|
(in thousands)
|
||||||||||||||
|
Gold
|
||||||||||||||
|
Salobo
|
$
|
246,219
|
$
|
53,155
|
$
|
41,777
|
$
|
-
|
$
|
151,287
|
$
|
193,063
|
$
|
2,341,485
|
|
Sudbury 2
|
27,295
|
5,591
|
15,192
|
-
|
6,512
|
21,420
|
268,224
|
|||||||
|
Constancia
|
55,718
|
11,939
|
9,028
|
-
|
34,751
|
43,779
|
86,555
|
|||||||
|
San Dimas
|
61,657
|
19,895
|
8,227
|
-
|
33,535
|
41,762
|
147,638
|
|||||||
|
Stillwater
|
12,201
|
2,175
|
3,202
|
-
|
6,824
|
10,026
|
212,650
|
|||||||
|
Other 3
|
|
10,324
|
|
5,969
|
|
916
|
|
-
|
|
3,439
|
|
4,090
|
|
557,035
|
|
Total gold interests
|
$
|
413,414
|
$
|
98,724
|
$
|
78,342
|
$
|
-
|
$
|
236,348
|
$
|
314,140
|
$
|
3,613,587
|
|
Silver
|
||||||||||||||
|
Peñasquito
|
$
|
90,967
|
$
|
17,053
|
$
|
15,646
|
$
|
-
|
$
|
58,268
|
$
|
73,915
|
$
|
278,028
|
|
Antamina
|
60,812
|
12,046
|
18,141
|
-
|
30,625
|
48,765
|
527,227
|
|||||||
|
Constancia
|
35,034
|
9,073
|
9,211
|
-
|
16,750
|
25,962
|
183,736
|
|||||||
|
Other 4
|
|
76,316
|
|
18,179
|
|
9,198
|
|
5,027
|
|
53,966
|
|
55,364
|
|
549,641
|
|
Total silver interests
|
$
|
263,129
|
$
|
56,351
|
$
|
52,196
|
$
|
5,027
|
$
|
159,609
|
$
|
204,006
|
$
|
1,538,632
|
|
Palladium
|
||||||||||||||
|
Stillwater
|
$
|
14,922
|
$
|
2,699
|
$
|
4,658
|
$
|
-
|
$
|
7,565
|
$
|
12,223
|
$
|
222,154
|
|
Platinum
|
||||||||||||||
|
Marathon
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
9,450
|
|
Cobalt
|
||||||||||||||
|
Voisey's Bay
|
$
|
11,108
|
$
|
2,639
|
$
|
10,712
|
$
|
-
|
$
|
(2,243)
|
$
|
13,056
|
$
|
353,631
|
|
Total mineral stream interests
|
$
|
702,573
|
$
|
160,413
|
$
|
145,908
|
$
|
5,027
|
$
|
401,279
|
$
|
543,425
|
$
|
5,737,454
|
|
Other
|
||||||||||||||
|
General and administrative
|
$
|
(28,922)
|
$
|
(29,702)
|
||||||||||
|
Share based compensation
|
(16,217)
|
(16,675)
|
||||||||||||
|
Donations and community investments
|
(5,054)
|
(4,896)
|
||||||||||||
|
Finance costs
|
(4,138)
|
(3,147)
|
||||||||||||
|
Other
|
26,961
|
24,823
|
||||||||||||
|
Income tax
|
|
|
|
|
|
|
|
|
|
(4,700)
|
|
(5,244)
|
|
|
|
Total other
|
|
|
|
|
|
|
|
|
$
|
(32,070)
|
$
|
(34,841)
|
$
|
1,144,061
|
|
Consolidated
|
|
|
|
|
|
|
|
|
$
|
369,209
|
$
|
508,584
|
$
|
6,881,515
|
| 1) |
See Notes 12 for more information.
|
| 2) |
Comprised of the operating Coleman, Copper Cliff, Garson, Creighton and Totten gold interests as well as the non-operating Stobie and Victor gold interests.
|
| 3) |
Where a gold interest represents less than 10% of the Company’s sales, gross margin or aggregate asset book value and is not evaluated on a regular basis by the Company’s CEO for the purpose of assessing
performance, the gold interest has been summarized under Other gold interests. Other gold interests are comprised of the operating Marmato gold interests as well as the non-operating Minto, 777, Copper World, Santo Domingo, Fenix, Blackwater,
Marathon, Curipamba, Goose and Cangrejos gold interests. On June 22, 2022, Hudbay announced that mining activities at 777 have concluded and closure activities have commenced. On May 13, 2023, Minto announced the suspension of operations at
the Minto mine.
|
| 4) |
Where a silver interest represents less than 10% of the Company’s sales, gross margin or aggregate asset book value and is not evaluated on a regular basis by the Company’s CEO for the purpose of assessing
performance, the silver interest has been summarized under Other silver interests. Other silver interests comprised of the operating Los Filos, Zinkgruvan, Neves-Corvo, Aljustrel, Cozamin and Marmato silver interests and the non-operating
Minto, 777, Loma de La Plata, Stratoni, Pascua-Lama, Copper World, Blackwater and Curipamba silver interests. On June 22, 2022, Hudbay announced that mining activities at 777 have concluded and closure activities have commenced. On May 13,
2023, Minto announced the suspension of operations at the Minto mine. On September 12, 2023, it was announced that the production of zinc and lead concentrates at Aljustrel will be halted from September 24, 2023 until the second quarter of
2025.
|
|
Sales
|
|
|
Carrying Amount at
September 30, 2024 |
|||||||||||||||
|
(in thousands)
|
Three Month Ended
Sep 30, 2024 |
Nine Months Ended
Sep 30, 2024 |
Gold
Interests |
Silver
Interests |
Palladium
Interests |
Platinum
Interests |
Cobalt
Interests |
Total
|
||||||||||
|
North America
|
|
|||||||||||||||||
|
Canada
|
$
|
7,225
|
2%
|
$
|
35,264
|
4%
|
$
|
706,745
|
$
|
165,990
|
$
|
-
|
$
|
9,452
|
$
|
345,745
|
$
|
1,227,932
|
|
United States
|
7,715
|
3%
|
27,675
|
3%
|
|
208,475
|
51,418
|
215,082
|
-
|
-
|
474,975
|
|||||||
|
Mexico
|
71,972
|
23%
|
200,478
|
22%
|
|
138,504
|
364,303
|
-
|
-
|
-
|
502,807
|
|||||||
|
Europe
|
|
|||||||||||||||||
|
Portugal
|
5,584
|
2%
|
18,053
|
2%
|
|
-
|
16,754
|
-
|
-
|
-
|
16,754
|
|||||||
|
Sweden
|
14,816
|
5%
|
40,045
|
4%
|
|
-
|
25,624
|
-
|
-
|
-
|
25,624
|
|||||||
|
UK
|
-
|
0%
|
-
|
0%
|
|
20,363
|
-
|
-
|
-
|
-
|
20,363
|
|||||||
|
South America
|
|
|||||||||||||||||
|
Argentina/Chile 1
|
-
|
0%
|
-
|
0%
|
|
-
|
253,514
|
-
|
-
|
-
|
253,514
|
|||||||
|
Argentina
|
-
|
0%
|
-
|
0%
|
|
-
|
10,889
|
-
|
-
|
-
|
10,889
|
|||||||
|
Chile
|
-
|
0%
|
-
|
0%
|
|
55,664
|
-
|
-
|
-
|
-
|
55,664
|
|||||||
|
Brazil
|
144,656
|
47%
|
391,973
|
43%
|
|
2,616,347
|
-
|
-
|
-
|
-
|
2,616,347
|
|||||||
|
Peru
|
52,991
|
17%
|
184,165
|
21%
|
|
70,095
|
668,267
|
-
|
-
|
-
|
738,362
|
|||||||
|
Ecuador
|
-
|
0%
|
-
|
0%
|
|
49,670
|
3,717
|
-
|
-
|
-
|
53,387
|
|||||||
|
Colombia
|
3,294
|
1%
|
6,470
|
1%
|
|
40,632
|
6,741
|
-
|
-
|
-
|
47,373
|
|||||||
|
Africa
|
-
|
-
|
|
|||||||||||||||
|
South Africa
|
|
-
|
0%
|
|
-
|
0%
|
|
275,725
|
|
-
|
|
78,820
|
|
57,587
|
|
-
|
|
412,132
|
|
Consolidated
|
$
|
308,253
|
100%
|
$
|
904,123
|
100%
|
$
|
4,182,220
|
$
|
1,567,217
|
$
|
293,902
|
$
|
67,039
|
$
|
345,745
|
$
|
6,456,123
|
| 1) |
Includes the Pascua-Lama project, which straddles the border of Argentina and Chile.
|
|
|
Sales
|
|
|
Carrying Amount at
December 31, 2023 |
||||||||||||||
|
(in thousands)
|
Three Month Ended
Sep 30, 2023 |
Nine Months Ended
Sep 30, 2023 |
Gold
Interests |
Silver
Interests |
Palladium
Interests |
Platinum
Interests |
Cobalt
Interests |
Total
|
||||||||||
|
North America
|
|
|||||||||||||||||
|
Canada
|
$
|
12,754
|
6%
|
$
|
46,310
|
7%
|
$
|
708,402
|
$
|
141,292
|
$
|
-
|
$
|
9,451
|
$
|
350,816
|
$
|
1,209,961
|
|
United States
|
9,166
|
4%
|
27,123
|
4%
|
|
211,470
|
971
|
220,667
|
-
|
-
|
433,108
|
|||||||
|
Mexico
|
33,681
|
15%
|
164,661
|
23%
|
|
144,719
|
396,490
|
-
|
-
|
-
|
541,209
|
|||||||
|
Europe
|
|
|||||||||||||||||
|
Portugal
|
9,106
|
4%
|
25,149
|
4%
|
|
-
|
17,516
|
-
|
-
|
-
|
17,516
|
|||||||
|
Sweden
|
16,862
|
8%
|
37,571
|
5%
|
|
-
|
27,017
|
-
|
-
|
-
|
27,017
|
|||||||
|
UK
|
-
|
0%
|
-
|
0%
|
|
20,198
|
-
|
-
|
-
|
-
|
20,198
|
|||||||
|
South America
|
|
|||||||||||||||||
|
Argentina/Chile 1
|
-
|
0%
|
-
|
0%
|
|
-
|
253,514
|
-
|
-
|
-
|
253,514
|
|||||||
|
Argentina
|
-
|
0%
|
-
|
0%
|
|
-
|
10,889
|
-
|
-
|
-
|
10,889
|
|||||||
|
Chile
|
-
|
0%
|
-
|
0%
|
|
56,538
|
-
|
-
|
-
|
-
|
56,538
|
|||||||
|
Brazil
|
86,395
|
38%
|
246,218
|
34%
|
|
2,681,419
|
-
|
-
|
-
|
-
|
2,681,419
|
|||||||
|
Peru
|
53,377
|
24%
|
151,564
|
22%
|
|
80,265
|
699,107
|
-
|
-
|
-
|
779,372
|
|||||||
|
Ecuador
|
-
|
0%
|
-
|
0%
|
|
39,455
|
3,779
|
-
|
-
|
-
|
43,234
|
|||||||
|
Colombia
|
|
1,796
|
1%
|
|
3,977
|
1%
|
|
41,583
|
|
6,883
|
|
-
|
|
-
|
|
-
|
|
48,466
|
|
Consolidated
|
$
|
223,137
|
100%
|
$
|
702,573
|
100%
|
$
|
3,984,049
|
$
|
1,557,458
|
$
|
220,667
|
$
|
9,451
|
$
|
350,816
|
$
|
6,122,441
|
| 1) |
Includes the Pascua-Lama project, which straddles the border of Argentina and Chile.
|
| 27. |
Subsequent Events
|
![]() |
| 1. |
Review: I have reviewed the interim
financial report and interim MD&A (together, the “interim filings”) of Wheaton Precious Metals Corp. (the “issuer”) for the interim period ended September 30, 2024.
|
| 2. |
No misrepresentations: Based on my
knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in
light of the circumstances under which it was made, with respect to the period covered by the interim filings.
|
| 3. |
Fair presentation: Based on my knowledge,
having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash
flows of the issuer, as of the date of and for the periods presented in the interim filings.
|
| 4. |
Responsibility: The issuer’s other
certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers’ Annual and Interim Filings, for the issuer.
|
| 5. |
Design: Subject to the limitations, if any,
described in paragraphs 5.2 and 5.3, the issuer’s other certifying officer(s) and I have, as at the end of the period covered by the interim filings
|
| (a) |
designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that
|
| (i) |
material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and
|
| (ii) |
information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is
recorded, processed, summarized and reported within the time periods specified in securities legislation; and
|
| (b) |
designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation
of financial statements for external purposes in accordance with the issuer’s GAAP.
|
| 5.1 |
Control framework: The control framework the
issuer’s other certifying officer(s) and I used to design the issuer’s ICFR is Internal Control – Integrated Framework (2013) issued by
the Committee of Sponsoring Organizations of the Treadway Commission.
|
| 5.2 |
N/A
|
| 5.3 |
N/A
|
| 6. |
Reporting changes in ICFR: The issuer has
disclosed in its interim MD&A any change in the issuer’s ICFR that occurred during the period beginning on July 1, 2024 and ended on September 30, 2024 that has materially affected, or is reasonably likely to materially affect, the
issuer’s ICFR.
|
| /s/ Randy Smallwood |
| Name: |
Randy Smallwood
|
| Title: |
President and Chief Executive Officer
|
| 1. |
Review: I have reviewed the interim financial
report and interim MD&A (together, the “interim filings”) of Wheaton Precious Metals Corp. (the “issuer”) for the interim period ended September 30, 2024.
|
| 2. |
No misrepresentations: Based on my knowledge,
having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the
circumstances under which it was made, with respect to the period covered by the interim filings.
|
| 3. |
Fair presentation: Based on my knowledge,
having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash
flows of the issuer, as of the date of and for the periods presented in the interim filings.
|
| 4. |
Responsibility: The issuer’s other certifying
officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers’ Annual and Interim Filings, for the issuer.
|
| 5. |
Design: Subject to the limitations, if any,
described in paragraphs 5.2 and 5.3, the issuer’s other certifying officer(s) and I have, as at the end of the period covered by the interim filings
|
| (a) |
designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that
|
| (i) |
material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and
|
| (ii) |
information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is
recorded, processed, summarized and reported within the time periods specified in securities legislation; and
|
| (b) |
designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of
financial statements for external purposes in accordance with the issuer’s GAAP.
|
| 5.1 |
Control framework: The control framework the
issuer’s other certifying officer(s) and I used to design the issuer’s ICFR is Internal Control – Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission.
|
| 5.2 |
N/A
|
| 5.3 |
N/A
|
| 6. |
Reporting changes in ICFR: The issuer has
disclosed in its interim MD&A any change in the issuer’s ICFR that occurred during the period beginning on July 1, 2024 and ended on September 30, 2024 that has materially affected, or is reasonably likely to materially affect, the issuer’s
ICFR.
|
| Date: | November 7, 2024 |
| /s/ Gary Brown |
| Name: |
Gary Brown
|
| Title: |
Senior Vice President and Chief Financial Officer
|
|
Yours truly,
|
|
| /s/ Wes Carson |
|
|
Wes Carson, P.Eng.
|
|
|
Vice President, Mining Operations
|
|
|
Wheaton Precious Metals Corp.
|
|
|
Yours truly,
|
|
| /s/ Neil Burns |
|
|
Neil Burns, M.Sc, P.Geo.
|
|
|
Vice President Technical Services,
|
|
|
Wheaton Precious Metals Corp.
|
|
|
Yours truly,
|
|
| /s/ Ryan Ulansky |
|
|
Ryan Ulansky, M.A.Sc., P.Eng.
|
|
|
Vice President, Engineering
|
|
|
Wheaton Precious Metals Corp.
|
|