SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER
Pursuant to Rule 13a-16 or 15d-16 of the
Securities Exchange Act of 1934
For the month of October 2025
Commission File Number: 001-41412
ioneer Ltd
(Translation of registrant’s name into English)
Suite 16.01, 213 Miller Street
North Sydney, NSW, 2060, Australia
(Address of principal executive offices)
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
Form 20-F ☒ Form 40-F ☐
EXHIBIT INDEX
The following exhibits are filed as part of this Form 6-K:
|
Exhibit
|
Description
|
|
|
Quarterly Report
|
||
SIGNATURE
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
|
ioneer Ltd
|
|||
|
(registrant)
|
|||
|
Date: October 20, 2025
|
By:
|
/s/ Ian Bucknell |
|
|
Name: Ian Bucknell
|
|||
|
Title: Chief Financial Officer & Company Secretary
|
|||
Exhibit 99.1
![]() |
![]() |
QUARTERLY ACTIVITIES REPORT
For the period ending 30 September 2025
Highlights
| • |
Leach Optimisation and New Mine Plan Yields Material Improvement in Project Economics
|
| o |
38% increase in unlevered life of mine NPV to US$1,888 million
|
| o |
16% increase in unlevered life of mine IRR to 16.8%
|
| o |
20% increase in annual lithium hydroxide production years 3-25 to 25,500 tpa
|
| o |
9% increase in annual boric acid production years 1-25 to 126,700 tpa
|
| o |
All-in sustaining cash cost of US$5,626 per metric tonne lithium carbonate equivalent
|
| • |
The Project has a stable overall operating cost structure due to the scale and reliability of its boric acid revenue. Boron remains one of the most stable natural
resource commodities.
|
| • |
Successfully raised US$2.2 million (~A$3.4 million) via a Share Purchase Plan
|
Monday, 20 October 2025 – Ioneer Ltd (“Ioneer”
or “the Company”) (ASX: INR, Nasdaq: IONR), an emerging lithium-boron supplier, is pleased to report on its activities for the quarter ending 30 September 2025 and provide an update on the development of its
100%-owned Rhyolite Ridge Lithium-Boron Project in Esmeralda County, Nevada (“Rhyolite Ridge Project” or “the Project”).
Bernard Rowe, Ioneer’s Managing Director, said, “The Rhyolite Ridge Project has again delivered with a material
upgrade to project economics in the September quarter, thanks to increased annual lithium and boron production. Reducing the leach retention time to two days will allow us to mine and process 25% more ore
annually due to the more efficient use of our sulphuric acid. These updates have resulted in a material increase in production volumes of both lithium and boron chemicals. Importantly, this material improvement does not require additional
capital expenditure or change to plant design.”
In commenting on the US$2.2 Million Share Purchase Plan, James D. Calaway, Ioneer’s Executive Chair, said, “The success of the Share
Purchase Plan is the result of strong engagement from existing investors, signalling market confidence in the Rhyolite Ridge Project.”
|
|
![]() |

Leach Optimisation and New Mine Plan Yields Material Improvement in Project Economics
In September 2025, Ioneer announced a material improvement in project economics for the Rhyolite Ridge Lithium-Boron Project1 following the quadrupling of ore reserve announcement in the June quarter.
The material upgrade to project economics is the result of reducing leach retention time to two days, from the previous three days. This optimisation will deliver a 25% increase in the amount of ore mined and processed
annually due to the more efficient use of our sulphuric acid and result in a material increase in production volumes of both lithium and boron chemicals.
Importantly, the improvement does not require additional capital expenditure or change to plant design.
A new mine plan was developed based on the higher processing rate leading to an updated Ore Reserve and Mineral Resource also being reported in September. The overall Reserve and Resource numbers
increased by approximately 5% from the 2 June 2025 announcement.
Ioneer engaged the independent services of Independent Mining Consultants, Inc. (IMC) to compile and complete the updated South Basin Mineral Resource and Ore Reserve estimates, which has been
verified and approved by their appointed Competent Person in compliance with JORC Code (2012).
The Mineral Resource is estimated at 539 million tonnes, including an Ore Reserve of 260 million tonnes, representing a small increase from the previous 2025 estimate. The Mineral Resource is inclusive of the Ore Reserve. The Company expects to mine and process 260 million tonnes over the 82-year mine life at an average annual rate of 3.2 million
tonnes per year. The 260 million tonnes represents 48% of the total Mineral Resource of 539 million tonnes.
The current 82-year mine plan is made up entirely of Reserve material (100%), and of that, approximately 35% is Proved Ore Reserve. The resource flexibility allows for a potential extension to the
life of the mine or expansion opportunities in the future. The Reserve and Resource estimates are summarised in Table 1 and 2 below.
Table 1: Summary comparison of the current Ore Reserve against the previous May 2025 Ore Reserve
|
Group
|
Classification
|
Tonnes
(Mt)
|
Li
(ppm)
|
B
(ppm)
|
Li2CO3
(wt. %)
|
H3BO3
(wt. %)
|
Li2CO3
(kt)
|
H3BO3
(kt)
|
|
August 2025
Reserve
|
Proved
|
89.5
|
1,574
|
6,589
|
0.84
|
3.77
|
750
|
3,373
|
|
Probable
|
170.8
|
1,386
|
4,473
|
0.74
|
2.56
|
1,260
|
4,369
|
|
|
Total
|
260.3
|
1,451
|
5,201
|
0.77
|
2.97
|
2,010
|
7,742
|
|
|
May 2025
Reserve
|
Proved
|
85.7
|
1,572
|
6,814
|
0.84
|
3.90
|
717
|
3,341
|
|
Probable
|
160.9
|
1,407
|
4,715
|
0.75
|
2.70
|
1,205
|
4,337
|
|
|
Total
|
246.6
|
1,464
|
5,444
|
0.78
|
3.11
|
1,922
|
7,678
|
|
|
Variation
|
Proved
|
3.8
|
2
|
-225
|
33
|
32
|
||
|
Probable
|
9.9
|
-21
|
-242
|
55
|
32
|
|||
|
Total
|
13.7
|
-13
|
-243
|
88
|
-64
|
1 See ASX announcement titled “Leach Optimisation and New Mine Plan Yields Material Improvement in Project Economics” dated 3 September 2025

Table 2: Summary comparison of the current Mineral Resource Estimate (Aug. 2025) against the previous Mineral Resource Estimate (Feb. 2025)
|
Processing
Stream
|
Group
|
Classification
|
Tonnes
(M)
|
Li
(ppm)
|
B
(ppm)
|
Li2CO3
(wt. %)
|
H3BO3
(wt. %)
|
Li2CO3
(kt)
|
H3BO3
(kt)
|
|
Combined
Streams
|
August 2025 Resource
|
Mea + Ind
|
434.3
|
1,437
|
5,092
|
0.76
|
2.91
|
3,321
|
12,645
|
|
Inf
|
105.1
|
1,332
|
3,472
|
0.71
|
1.99
|
745
|
2,088
|
||
|
Total
|
539.5
|
1,417
|
4,776
|
0.75
|
2.73
|
4,067
|
14,733
|
||
|
February
2025
Resource
|
Mea + Ind
|
413.8
|
1,479
|
5.321
|
0.79
|
3.04
|
3,257
|
12,591
|
|
|
Inf
|
96.6
|
1,387
|
3,745
|
0.74
|
2.14
|
713
|
2,069
|
||
|
Total
|
510.4
|
1,462
|
5,023
|
0.78
|
2.87
|
3,970
|
14,659
|
||
|
Variation
|
Mea + Ind
|
20.5
|
64.6
|
54.7
|
|||||
|
Inf
|
8.6
|
32.3
|
19.0
|
||||||
|
Total
|
29.1
|
97.0
|
73.7
|
The updated stage one operation with reduced leach times and higher plant throughput result in materially improved project economics, further enhancing the attractiveness of Rhyolite Ridge. The updated findings position
Ioneer, on an LCE basis, in the lowest cost quartile for lithium production globally with an estimated all-in sustaining cash cost to produce battery grade lithium hydroxide of US$5,626 and a C1 cash cost of $3,554 per tonne net of expected boric
acid revenue in the first 25 years.
The Project has a stable overall operating cost structure to produce lithium carbonate and battery grade lithium hydroxide due to the scale and reliability of its boric acid revenue. Boron has remained one of the most
stable natural resource commodities over many decades.
Table 3: Key Metrics Comparison
|
June 2025
3-day leach |
August 2025
2-day leach |
|
|
$1,367 million
|
Unlevered NPV8
|
$1,888 million
|
|
$497 million
|
Avg. LOM Annual Revenue
|
$575 million
|
|
17,200 tpa
|
Avg. LOM LCE Prod. pa
|
19,300 tpa
|
|
60,400 tpa
|
Avg. LOM Boric Acid Prod. pa
|
68,000 tpa
|
|
246.6 Mt
|
Ore Processed
|
260.3 Mt
|
|
95 years
|
Life of Project
|
82 years
|
|
$319 million
|
Average Annual EBITDA
|
$384 million
|
|
$1,668 million
AACE Class 2 estimate
|
Capital Costs
|
$1,668 million
AACE Class 2 estimate
|
|
$1,830 million
|
Sustaining Capex
|
$2,242 million
|
|
14.5%
|
Unlevered IRR
|
16.8%
|
|
8 years (from operations)
|
Payback Period
|
7 years (from operations)
|
|
P65
|
Confidence Level
|
P65
|

Equity Raising
During the Quarter, Ioneer Ltd announced the results of the Company’s Share Purchase Plan (SPP) as announced on 13 June 2025.
The SPP closed on 10 July 2025. It followed the successful completion of a US$16 million (~A$25 million) placement to sophisticated and professional investors as announced on 13 June 2025 (Placement).
The Company received applications for 33,550,000 new fully paid ordinary shares under the SPP, raising approximately US$2.2 million (~A$3.4 million). The SPP Shares were issued on 17 July 2025, with trading of the SPP
Shares commencing on 18 July 2025.
The SPP provided eligible shareholders with the opportunity to subscribe for up to A$30,000 of new fully paid ordinary shares at A$0.10 per share, being the same price paid by participants in the Placement.
Funds raised by the Placement and SPP will be applied to accelerate the development of Ioneer’s 100% owned Rhyolite Ridge Lithium-Boron Project (Project), including to:
| • |
Advance Project readiness;
|
| • |
Fund environmental, permitting expenses and commitments;
|
| • |
Pay other Project costs; and
|
| • |
Fund working capital and general corporate purposes.
|
Strategic Partnering Process
In late June, Ioneer launched its formal strategic partnering process to identify a strong equity partner to help accelerate the development of Rhyolite Ridge and advance the Project into production and that the
process was expected to take a minimum of 4 months.
The strategic process is ongoing and Ioneer is in active discussions with a number of parties.
Goldman Sachs & Co. LLC is assisting with the strategic partnering process and acting as financial advisor to Ioneer.
Ioneer now holds all significant Federal and State authorizations required for construction of the Rhyolite Ridge Project.
The State of Nevada issued the final revision of the Class II Air Operating Permit on 21 July 2025. Similarly, The State of Nevada issued the final modified Water Pollution Control Permit on 8 August 2025, which aligned
operational aspects of the Project to the approved Mine Plan of Operations. The Bureau of Land Management (BLM) issued a favorable Record of Decision (ROD) on 24 October 2024, authorizing the Plan of Operations and completing the National
Environmental Policy Act (NEPA) process.
In October 2024, the Center for Biological Diversity (CBD) filed a federal lawsuit against the BLM decision. In November 2024, Ioneer filed a motion to intervene and join the federal government in its defence, which the
court allowed in January 2025. Preliminary filings were made in Q2 2025 and will continue through the second half of 2025.

Sales & Marketing
EV Demand
According to the International Energy Agency (IEA), global electric vehicle (EV) sales are expected to surpass 20 million units in 2025, representing more than 25% of all cars sold worldwide, a significant increase from
2024's sales of more than 17 million units. China and Europe are leading this growth, with China expected to account for approximately 60% of new car sales and Europe circa 25%. Significant growth is also expected in other emerging markets, with
Asia and Latin America the key contributors. In the U.S., EV sales in 2025 are expected to reach 11% of market share. The IEA's data shows that the global EV market remains on a strong upward trend even with potential threats of higher tariffs and
lower GDP growth.
Lithium Market and Price
The lithium market remains oversupplied and is projected to peak in 2027. Demand growth is expected to outpace supply growth, leading to a decline in lithium surpluses starting in 2028, with a balanced market anticipated
by 2032. The battery-grade lithium market is tighter and is expected to enter deficit from 2030.
Wood Mackenzie predicts that global lithium demand will grow at a cumulative annual growth rate (CAGR) of 9.1% from 2025 to 2035, with the market continuing to grow at double-digit rates until 2029. Lithium demand across
all end-use sectors is slightly lower in 2025 compared to the previous forecast, standing at 1.51 million tons lithium carbonate equivalent (LCE).
China’s preference for lithium iron phosphate (LFP) cathode chemistries is driving demand for battery-grade lithium carbonate. International interest in LFP is also increasing. Wood Mackenzie projects that battery-grade
lithium carbonate will grow at an 8% CAGR from 2025 to 2035.
The need for nickel-rich cathodes, such as nickel cobalt aluminium Oxide (NCA) and nickel manganese cobalt (NMC) chemistry batteries, drives the demand for battery-grade lithium hydroxide. These batteries remain vital
due to their high energy density and enhanced performance. Wood Mackenzie projects demand will grow at an annual rate of 12.3% from 2025 to 2035.
Wood Mackenzie forecasts that the average spodumene price will be US$804 per ton, with a 3-5% increase in 2025, and a recovery is expected in 2029. The spodumene market is currently in a persistent deficit, reflecting
strong chemical production, and prices remain closely tied to lithium chemical prices. An oversupply of lithium chemicals is likely to hinder a quick rebound. In the third quarter, lithium chemical prices increased compared to the previous quarter.
Wood Mackenzie forecasts that in 2026, spot prices will average US$9,822 per ton for carbonate and US$9,555 for hydroxide, while contract prices will be US$11,997/ton for carbonate and US$11,923/ton for hydroxide.
Boric Acid Market and Price
The boric acid market in 2025 is expected to continue exhibiting stable growth of over 3%, driven by strong demand from the consumer electronics sector (TFT display glass substrates), the military (ferroboron and boron
carbide), and the construction industry (insulation and ceramics).
The third quarter saw the global boric acid market begin to show signs of market tightness, with key suppliers’ lead times increasing and shipment delays, contrasting with the small oversupply in the first half of 2025.
The boric acid price in the third quarter has been stable compared to the first half of the year with slight upward pressure.

Environmental, Health, Safety & Sustainability (EHSS) Program
Sustainability Road Mapping /External Disclosure Alignment
Ioneer has committed to participate in the S&P Global 2025 Corporate Sustainability Assessment with information due for submission in October 2025, followed by the S&P Global Assessment Report, due in late Q4
2025.
Environmental Regulatory Compliance
Ioneer continues to maintain compliance with the issued State of Nevada Water Pollution Control Permit, Class 2 Air Permit and State Reclamation permit. No compliance issues were noted during the quarter and Ioneer
continues to report ongoing monitoring and compliance related activities as required under these obligations.
Health & Safety
During the quarter, Ioneer reported no lost time incidents, first aid incidents, or fatalities for Ioneer staff.
Tiehm’s buckwheat
Tiehm’s buckwheat conservation efforts continued at the Company’s dedicated greenhouse in Nevada during the quarter and focussed on the germination, propagation of new seedlings, and supporting the flowering and
pollination of existing plants. The Company continues to demonstrate the ability to grow and reproduce Tiehm’s buckwheat from seed in a variety of soil types including soils that are low in both lithium and boron.
Ioneer continues to work closely with the BLM and USFW service to finalize the various Tiehm's buckwheat Applicant Proposed Conservation Measure Protocol and Procedure documents as outlined in the BLM's Record of
Decision and USFWS Biological Opinion. As of the end of the quarter, 8 of the 12 Protocol and Procedure documents have been issued for use, another is in agency review, and the remaining three are expected to be issued for use in Q1 2026. Further
towards the conservation of Tiehm's buckwheat, ioneer voluntarily initiated the development of a Controlled Propagation Plan in collaboration with USFWS and BLM. The objectives of this multi-year effort are to establish new populations of Tiehm's
buckwheat outside the Rhyolite Ridge project area to promote redundancy, representation and resilience in the species.
Community & Tribal Nations
Ioneer continues to engage with local communities and Tribal Nations to address any environmental and social concerns and enhance local economic opportunities.
Engineering
During the quarter, the engineering team continued to work toward completing updated resource and reserve estimates, revised mine plan and capital expenditure/operating expenditure estimates. In parallel, work continued
on several value enhancement projects and operational improvements.
Organic Growth Projects
EcoPro Lithium Clay Project
The EcoPro Lithium Clay R&D project continues to make promising progress in Q3 2025, demonstrating positive momentum in balancing lithium recovery and impurity removal while reducing sulphuric
acid consumption and associated costs. Ioneer and EcoPro plan to complete the process flow chart with economic analysis by the end of the year for joint assessment.

Corporate Activities
2025 Sustainability Report
In September, Ioneer released and published its 2025 Sustainability Report, our fourth annual report on our advancing sustainability strategy, initiatives and performance for FY2025. This report
can be found on the Ioneer website.
Annual General Meeting
The Annual General Meeting will be held at 10:00 am (AEDT) on Friday, 31 October 2025. Shareholders are invited to attend the virtual AGM online. The Notice of Meeting and instructions on how to
participate in the meeting can be found on the Ioneer website.
Departure of Chief Financial Officer
In September, the Company announced that Ian Bucknell, Chief Financial Officer (CFO) and Company Secretary, would depart the Company to pursue other interests, effective mid-December. This comes
after seven years of service with the company and marks a transition point for the company as his replacement will be U.S. based. Ian is working through his contractual notice period, ensuring business continuity and a smooth transition of the
CFO and Company Secretarial roles and responsibilities.
Change in Financial Year End
During the quarter, Ioneer announced that the Board of Directors had resolved to change Ioneer’s financial year from 1 July - 30 June, to 1 January - 31 December.
Update to Estimated Project Timeline
Ioneer’s estimated timing* for the Rhyolite Ridge Lithium-Boron Project is as follows:
|
Milestone
|
Targeted timing*
|
Note
|
||||
|
Issue an updated report under Subpart 1300 of U.S. Securities and Exchange Regulation S-K regarding mineral resources and reserves supported by the mine plan and economic update announced in September
|
4Q 2025
|
|||||
|
Targeted release of JORC summary of a mine plan and updated project economics highlighting additional project optimisation
|
4Q 2025
|
|||||
|
Targeted completion of Strategic Partner process
|
1H 2026
|
The strategic process is ongoing and Ioneer is in active discussions with a number of parties.
|
||||
|
Targeted Final Investment Decision (FID)
|
TBA
|
Dependent on outcomes of Strategic Partnering Process and requirement to refresh Project economics.
|
||||
|
Construction
|
Circa 36 months
|
Includes supply of long-lead items and construction. Subject to lead times and when orders are placed.
|
*As of the date of this quarterly, and subject to change.

Upcoming Work Program
The work program over the coming months includes:
| • |
Issue updated report under Subpart 1300 of U.S. Securities and Exchange Regulation S-K
|
| • |
Issue updated JORC summary of a mine plan and updated project economics highlighting additional project optimisation
|
| • |
Complete a strategic partnering process for the Rhyolite Ridge Project
|
| • |
Make a Final Investment Decision
|
ASX Additional Information
The Company provides the following information pursuant to ASX Listing Rule requirements.
| 1. |
ASX LR 5.3.1: Exploration and Evaluation Expenditure during the quarter was US$3.5 million. Details of the exploration activity are set out in this report. A breakdown of
the expenditure is shown below:
|
|
US$’000
|
||
|
Exploration
|
51
|
|
|
Engineering
|
1813
|
|
|
Environmental
|
837
|
|
|
Sales & Marketing
|
115
|
|
|
Other
|
660
|
|
|
Total
|
3,476
|
| 2. |
ASX LR 5.3.2: The Company confirms there were no production or development activities during the quarter.
|
| 3. |
ASX LR 5.3.5: Related party payments for the quarter totalled US$266,443 comprising salaries and fees for the Company’s executive and non-executive
directors. No other payments were made to any related parties of the entity or their associates.
|
| 4. |
ASX LR 5.3.3: INR confirms that it has not acquired tenements during the quarter (see Appendix 1).
|

Capital Structure
Total cash and cash equivalents as of 30 September 2025, was US$21.8 million of which 43% was held in USD with the balance held in AUD.
At the end of the quarter, Ioneer had on issue:
| • |
2.66 billion ordinary shares,
|
| • |
78.19 million performance rights, and
|
| • |
1.63 million options.
|
This ASX release has been authorised by Ioneer Managing Director, Bernard Rowe.
--ENDS—
Media Contact
|
Chad Yeftich
Ioneer USA Corporation |
Ian Bucknell
Ioneer Limited |
|
|
Investor Relations (USA)
T: +1 775 993 8563 E: ir@ioneer.com |
Investor Relations (AUS)
T: +61 434 567 155 E: ir@ioneer.com |

About Ioneer
Ioneer Ltd is an emerging lithium–boron producer and the 100% owner of the Rhyolite Ridge Lithium-Boron Project located in Nevada, USA. Rhyolite Ridge is one of two known lithium-boron ore deposits in North America and
one of only three known such deposits in the world. Once operational, the world-class project is expected to power upward of 50 million electric vehicles and will instantly become a globally significant source of critical materials vital to the
clean energy transition.
In October 2024, Ioneer received its federal permit for the Rhyolite Ridge Lithium-Boron Project from the Bureau of Land Management. In January 2025, the U.S. Department of Energy finalized a $996 million loan debt
financing for ioneer's Rhyolite Ridge lithium project. Ioneer signed separate offtake agreements with Dragonfly Energy in 2023, Ford Motor Company and PPES (joint venture between Toyota and Panasonic) in 2022 and Korea’s EcoPro Innovation in 2021.
To learn more about Ioneer, visit www.Ioneer.com/investors
or find us on X, Facebook, LinkedIn, Instagram
and YouTube.
Competent Persons Statement
In respect of Mineral Resources and Ore Reserves referred to in this presentation and previously reported by the Company in accordance with JORC Code 2012, the Company confirms that it is not aware of any new information
or data that materially affects the information included in the public report titled “Leach Optimisation and New Mine Plan Yields Material Improvement in Project Economics” dated 3 September 2025, released on ASX.
Further information regarding the Mineral Resource estimate and Ore Reserve can be found in that report. All material assumptions and technical parameters underpinning the estimates in the report continue to apply and have not materially changed.
In respect of production targets referred to in this presentation, the Company confirms that it is not aware of any new information or data that materially affects the information included in the public report titled
“Leach Optimisation and New Mine Plan Yields Material Improvement in Project Economics” dated 3 September 2025. Further information regarding the production estimates can be found in that report. All material assumptions and technical parameters
underpinning the estimates in the report continue to apply and have not materially changed.

Recent Announcements
The table below lists announcements made by the Company during the quarter.
|
Date Released
|
Title
|
|
|
02/07/2025
|
Application for quotation of securities - INR
|
|
|
02/07/2025
|
Notification of cessation of securities - INR
|
|
|
02/07/2025
|
Change of Director’s Interest – Bernard Rowe
|
|
|
02/07/2025
|
Change of Director’s Interest – James Calaway
|
|
|
17/07/2025
|
Results of Share Purchase Plan
|
|
|
17/07/2025
|
Application for quotation of securities - INR
|
|
|
17/07/2025
|
Change of Director’s Interest – Alan Davies
|
|
|
17/07/2025
|
Change of Director’s Interest – Bernard Rowe
|
|
|
17/07/2025
|
Change of Director’s Interest – Tim Woodall
|
|
|
17/07/2025
|
Change of Director’s Interest – Maggi Walker
|
|
|
28/07/2025
|
June 2025 – Quarterly Activities Report
|
|
|
28/07/2025
|
June 2025 – Quarterly Cash Flow Report
|
|
|
04/08/2025
|
Ceasing to be a substantial holder
|
|
|
26/08/2025
|
Application for quotation of securities - INR
|
|
|
28/08/2025
|
Notification regarding unquoted securities - INR
|
|
|
01/09/2025
|
Application for quotation of securities - INR
|
|
|
03/09/2025
|
Material Improvement in Project Economics
|
|
|
04/09/2025
|
Date of 2025 Annual General Meeting
|
|
|
04/09/2025
|
Investor Webinar Details
|
|
|
04/09/2025
|
Investor Presentation September 2025
|
|
|
05/09/2025
|
S&P DJI Announces September 2025 Quarterly Rebalance
|
|
|
17/09/2025
|
Annual Report to Shareholders
|
|
|
17/09/2025
|
Sustainability Report 2025
|
|
|
17/09/2025
|
Corporate Governance Statement – 30 June 2025
|
|
|
17/09/2025
|
Appendix 4G – 30 June 2025
|
|
|
22/09/2025
|
Departure of Chief Financial Officer
|
|
|
25/09/2025
|
Change in Financial Year End
|
|
|
30/09/2025
|
Notice of Annual General Meeting/Proxy Form
|

Appendix 1 - Schedule of Tenements
ASX listing rule 5.3.3
|
Country
|
Project
|
Tenement ID
|
Tenement Name
|
Area (km2)
|
Interest at beginning
of quarter
|
Interest at end of
quarter
|
Note
|
||||||||
|
USA
|
Rhyolite Ridge
|
NMC1117360
|
SLB claims (199)
|
15.9
|
100%
|
100%
|
No change
|
||||||||
|
USA
|
Rhyolite Ridge
|
NV105809159
|
SLB claims (18)
|
1.4
|
100%
|
100%
|
No change
|
||||||||
|
USA
|
Rhyolite Ridge
|
NMC1171536
|
SLM claims (122)
|
9.6
|
100%
|
100%
|
No change
|
||||||||
|
USA
|
Rhyolite Ridge
|
NMC 1179516
|
RR claims (65)
|
4.8
|
100%
|
100%
|
No change
|
||||||||
|
USA
|
Rhyolite Ridge
|
NV105810398
|
RR claims (14)
|
1.1
|
100%
|
100%
|
No change
|
||||||||
|
USA
|
Rhyolite Ridge
|
NV105272779
|
RMS mill sites (23)
|
0.5
|
100%
|
100%
|
No change
|
||||||||
|
USA
|
Rhyolite Ridge
|
NV106354216
|
RMS mill sites (325)
|
6.5
|
100%
|
100%
|
No change
|
||||||||
|
USA
|
Rhyolite Ridge
|
NMC1147932
|
SLP claims (120)
|
9.6
|
100%
|
100%
|
No change
|
||||||||
|
USA
|
Rhyolite Ridge
|
NV105272053
|
PR claims (11)
|
0.9
|
100%
|
100%
|
No change
|
||||||||
|
USA
|
SM
|
NMC1166813
|
SM claims (96)
|
7.7
|
100%
|
0%
|
Released
|
||||||||
|
USA
|
GD
|
NMC1166909
|
GD claims (13)
|
1.0
|
100%
|
0%
|
Released
|
||||||||
|
USA
|
CLD
|
NMC1167700
|
CLD claims (65)
|
5.1
|
100%
|
0%
|
Released
|
||||||||
|
USA
|
Beacon Hill
|
NMC1118666
|
NLB claims (160)
|
12.8
|
100%
|
100%
|
No change
|
||||||||
|
USA
|
Beacon Hill
|
NV106310781
|
NLB claims (41)
|
3.3
|
100%
|
100%
|
No change
|
||||||||
|
USA
|
Beacon Hill
|
NMC 1129523
|
BH claims (81)
|
6
|
100%
|
100%
|
No change
|
||||||||
|
USA
|
Sarcobatus Basin
|
NV106735396
|
COB claims (231)
|
18.5
|
100%
|
100%
|
No change
|