6-K
Keel Infrastructure Corp. (KEEL)
UNITED STATES
SECURITIESAND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
REPORT OF FOREIGN PRIVATEISSUER
PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934
For the month of August2024
Commission File Number:001-40370
BITFARMS LTD.
(Translation of registrant’s name into English)
110 Yonge Street, Suite 1601, Toronto,Ontario, Canada M5C 1T4
(Address of principal executive offices)
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
Form 20-F ☐ Form 40-F ☒
DOCUMENTS INCLUDED AS PARTOF THIS FORM 6-K
On August 1, 2024, the Registrant filed with the Canadian Securities Regulatory Authorities on the System for Electronic Data Analysis and Retrieval + (SEDAR +) a material change report that includes a copy of a press release, a copy of which is attached hereto as Exhibit 99.1, and a press release, a copy of which is attached hereto as Exhibit 99.2, which are incorporated by reference into the Company’s Registration Statement on Form F-10 (File No. 333-272989) and the Registration Statement of Bitfarms Ltd. on Form S-8 (File No. 333-278868).
See the Exhibits listed below.
| Exhibits | |
|---|---|
| Exhibit No. | Description |
| 99.1 | Material Change Report dated August 1, 2024 |
| 99.2 | Press release dated August 1, 2024 |
1
SIGNATURE
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
| BITFARMS LTD. | ||
|---|---|---|
| By: | /s/ Ben Gagnon | |
| Name: | Ben Gagnon | |
| Title: | Chief Executive Officer |
Date: August 1, 2024
2
Exhibit 99.1
FORM 51-102F3MATERIAL CHANGE REPORT
| Item 1 | Name and Address of Company |
|---|
Bitfarms Ltd. (“Bitfarms” or the “Company”)
110 Yonge Street, Suite 1601
Toronto, Ontario M5C 1T4
| Item 2 | Date of Material Change |
|---|
August 1, 2024
| Item 3 | News Release |
|---|
The press release attached as Schedule “A” was released on August 1, 2024 by a newswire company in Canada.
| Item 4 | Summary of Material Change |
|---|
The material change is described in the press release attached as Schedule “A”.
| Item 5 | Full Description of Material Change |
|---|
The material change is described in the press release attached as Schedule “A”.
| Item 6 | Reliance of subsection 7.1(2) of National Instrument 51-102 |
|---|
Not applicable.
| Item 7 | Omitted Information |
|---|
Not applicable.
| Item 8 | Executive Officer |
|---|
Ben Gagnon
Chief Executive Officer
Bitfarms Ltd.
Bgagnon@bitfarms.com
| Item 9 | Date of Report |
|---|
August 1, 2024.
Schedule “A”

BitfarmsProvides July 2024 Productionand Operations Update ****
Earned 253 BTC in July 2024 & Increased HODL to 1,016 BTC -
Increased Operational Hashrate to 11.1 EH/s -
Thisnews release constitutes a “designated news release” for the purposes of the Company’s prospectus supplement datedMarch 8, 2024, to its short form base shelf prospectus dated November 10, 2023.
Toronto, Ontarioand Brossard, Québec (August 1, 2024) - Bitfarms Ltd. (NASDAQ/TSX: BITF), a global vertically integrated Bitcoin mining data center company, provides its monthly production report and update on its fleet upgrade and expansion. All financial references are in U.S. dollars.
“As we continue to execute on the fleet upgrade program, we are gaining market share and driving increasing amounts of Bitcoin mined month-over-month. Since the halving event in April, our Bitcoin mined per month has increased 62%. This speaks volumes to our operational expertise and improved efficiency, and I am confident that we are well-positioned to further accelerate our growth and drive value for shareholders,” said Ben Gagnon, Chief Executive Officer.
“In Paraguay, Paso Pe, our largest site measured by both MWs and hashrate, is now fully operational. Construction in Yguazu is progressing rapidly with four warehouses being constructed simultaneously with foundation and road work on site,” said Mr. Gagnon. “Hashrate remains below the 12 EH/s target primarily due to the underperformance of a batch of ~3,000 T21s, representing ~700 PH/s, that experience overheating issues even at lower temperatures. Bitmain is rapidly replacing these machines at their expense. The new miners are expected to arrive and be installed on site in three weeks. We have worked closely with Bitmain to resolve these manufacturing issues and to prevent a re-occurrence in future batches, including August deliveries. We remain pleased with the overall performance of our T21 miners, with the vast majority performing and hashing as expected. Further optimizations on site and software enhancements are also expected to drive continued improvements in August.”
“Our 2024 growth and efficiency improvement plans are fully funded with sufficient liquidity for the infrastructure buildout and miner procurement. This will enable us to achieve our year-end guidance of 21 EH/s and 21 w/TH. Being fully funded reduces our near-term capex requirements and allows us to apply a greater amount of excess cash flow from operations to building our HODL, which increased by 111 Bitcoin during July,” said Jeff Lucas, Chief Financial Officer.
2
Mining Review
Bitcoin difficulty increased 8.4% in the month. July mining operations generated 253 BTC compared to 189 BTC in June as a result of increasing corporate hashrate during the month.
| Key Performance Indicators | July 2024 | June 2024 | July 2023 | |||
|---|---|---|---|---|---|---|
| Total BTC earned | 253 | 189 | 378 | |||
| Month End Operating EH/s | 11.1 | 10.4 | 5.3 | |||
| BTC/Avg. EH/s | 25 | 25 | 76 | |||
| Average Operating EH/s | 10.3 | 7.6 | 5.0 | |||
| Operating Capacity (MW) | 310 | 310 | 212 | |||
| Hydropower (MW) | 256 | 256 | 183 | |||
| Watts/Terahash Efficiency (w/TH) | 25 | 25 | 38 | |||
| BTC Sold | 142 | 134 | 333 |
July 2024 SelectOperating Highlights
| ● | 11.1 EH/s operational at July 31, 2024, up 109%<br>Y/Y and 7% M/M. |
|---|---|
| ● | 10.3 EH/s average operational, up 36% M/M. |
| --- | --- |
| ● | 24.6 BTC/average EH/s, down 1% from the previous<br>month due to the increase in network difficulty, offset by the installation of Bitmain T21 miners. |
| --- | --- |
| ● | 253 BTC earned, 34% higher M/M and 33% lower<br>Y/Y. |
| --- | --- |
| ● | 8.2 BTC earned daily on average, equal to ~$542,000<br>per day based on a BTC price of $66,100 at July 31, 2024. |
| --- | --- |
| ● | In Québec, |
| --- | --- |
| o | At Baie-Comeau, expansion work is progressing on schedule<br>for the 12 MW expansion to 22 MW which is scheduled to be energized on September 1, 2024. |
| --- | --- |
| ● | In Paraguay, |
| --- | --- |
| o | At Paso Pe, all five warehouses and eight hydro containers<br>have been fully energized and are actively hashing. |
| --- | --- |
| o | At Yguazu, construction is progressing rapidly and remains<br>on schedule. |
| --- | --- |
3
Bitfarms’BTC Monthly Production
| Month | BTC Earned<br><br> 2024 | BTC Earned<br><br> 2023 | ||
|---|---|---|---|---|
| January | 357 | 486 | ||
| February | 300 | 387 | ||
| March | 286 | 424 | ||
| April | 269 | 379 | ||
| May | 156 | 459 | ||
| June | 189 | 385 | ||
| July | 253 | 378 | ||
| YTD Totals | 1,810 | 2,898 |
July 2024 FinancialUpdate
| ● | Sold 142 of the 253 BTC earned as part of the<br>Company’s regular treasury management process for total proceeds of $8.6 million. |
|---|---|
| ● | Added 111 BTC, bringing Treasury to 1,016 BTC,<br>up from 905 BTC last month and representing $67.2 million based on a BTC price of $66,100 at July 31, 2024. |
| --- | --- |
| ● | Synthetic HODL™ of 233 long-dated BTC call<br>options at July 31, 2024. |
| --- | --- |
Upcoming Conferencesand Events
| ● | August 8: Q2 2024 Conference Call at 8am ET |
|---|---|
| ● | September 9-11: H.C. Wainwright 26th Annual Global<br>Investment Conference |
| --- | --- |
| ● | October 21-22: AIM Summit Dubai |
| --- | --- |
AboutBitfarms Ltd
Founded in 2017, Bitfarms is a global vertically integrated Bitcoin mining data center company that contributes its computational power to one or more mining pools from which it receives payment in Bitcoin. Bitfarms develops, owns, and operates vertically integrated mining facilities with in-house management and company-owned electrical engineering, installation service, and multiple onsite technical repair centers. The Company’s proprietary data analytics system delivers best-in-class operational performance and uptime.
Bitfarms currently has 12 operating Bitcoin data centers and two under development situated in four countries: Canada, the United States, Paraguay, and Argentina. Powered predominantly by environmentally friendly hydro-electric and long-term power contracts, Bitfarms is committed to using sustainable and often underutilized energy infrastructure.
To learn more about Bitfarms’ events, developments, and online communities:
| www.bitfarms.com |
|---|
https://www.facebook.com/bitfarms/
https://twitter.com/Bitfarms_io
https://www.instagram.com/bitfarms/
https://www.linkedin.com/company/bitfarms/
4
Glossaryof Terms
| ● | Y/Y or M/M= year over year or month over month |
|---|---|
| ● | BTC or BTC/day = Bitcoin or Bitcoin per day |
| --- | --- |
| ● | HPC = High-performance computing |
| --- | --- |
| ● | AI = Artificial intelligence |
| --- | --- |
| ● | EH or EH/s = Exahash or exahash per second |
| --- | --- |
| ● | MW or MWh = Megawatts or megawatt hour |
| --- | --- |
| ● | PH or PH/s = Petahash or petahash per second |
| --- | --- |
| ● | TH or TH/s = Terahash or terahash per second |
| --- | --- |
| ● | w/TH = Watts/Terahash efficiency (includes cost of powering supplementaryequipment) |
| --- | --- |
| ● | Synthetic HODL™ = the use of instrumentsthat create BTC equivalent exposure |
| --- | --- |
CautionaryStatement
Tradingin the securities of the Company should be considered highly speculative. No stock exchange, securities commission or other regulatoryauthority has approved or disapproved the information contained herein. Neither the Toronto Stock Exchange, Nasdaq, or any other securitiesexchange or regulatory authority accepts responsibility for the adequacy or accuracy of this release.
Forward-LookingStatements
Thisnews release contains certain “forward-looking information” and “forward-looking statements” (collectively, “forward-lookinginformation”) that are based on expectations, estimates and projections as at the date of this news release and are covered by safeharbors under Canadian and United States securities laws. The statements and information in this release regarding projected growth, targethashrate, opportunities relating to the Company’s geographical diversification and expansion, upgrading and deployment of minersas well as the timing therefor, improved financial performance and balance sheet liquidity, other growth opportunities and prospects,and other statements regarding future growth, plans and objectives of the Company are forward-looking information. Any statements thatinvolve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events orperformance (often but not always using phrases such as “expects”, or “does not expect”, “is expected”,“anticipates” or “does not anticipate”, “plans”, “budget”, “scheduled”, “forecasts”,“estimates”, “prospects”, “believes” or “intends” or variations of such words and phrasesor stating that certain actions, events or results “may” or “could”, “would”, “might”or “will” be taken to occur or be achieved) are not statements of historical fact and may be forward-looking information andare intended to identify forward-looking information.
5
Thisforward-looking information is based on assumptions and estimates of management of the Company at the time they were made, and involvesknown and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements of the Companyto be materially different from any future results, performance or achievements expressed or implied by such forward-looking information.Such factors include, among others, risks relating to: the construction and operation of new facilities may not occur as currently planned,or at all; expansion of existing facilities may not materialize as currently anticipated, or at all; new miners may not perform up toexpectations; revenue may not increase as currently anticipated, or at all; the ongoing ability to successfully mine digital currencyis not assured; it may not be possible to profitably liquidate the current digital currency inventory, or at all; the digital currencymarket may not continue to be accepted by users; digital currency prices are volatile and a decline in digital currency prices may havea significant negative impact on operations; an increase in network difficulty may have a significant negative impact on operations;the anticipated growth and sustainability of hydroelectricity for the purposes of cryptocurrency mining in the applicable jurisdictionsmay not be achieved; the Company may not be able to maintain reliable and economical sources of power for the Company to operate itscryptocurrency mining assets; there may be increases in the Company’s electricity costs and costs of natural gas, the Company maybe impacted by changes in currency exchange rates, energy curtailment or regulatory changes in the energy regimes in the jurisdictionsin which the Company operates, which could adversely impact the Company’s profitability; the Company ability to expand will dependupon the completion of future financings; and the adoption of new, or changes in existing, regulations or laws could prevent the Companyfrom operating its business, or make it more costly to do so. For further information concerning these and other risks and uncertainties,refer to the Company’s filings on www.SEDAR.com (which are also available on the website of the U.S. Securities and Exchange Commissionat www.sec.gov), including the Company’s annual information form for the year-ended December 31, 2023, filed on March 7,2024 andthe MD&A for the three-month period ended March 31, 2024. Although the Company has attempted to identify important factors that couldcause actual results to differ materially from those expressed in forward-looking statements, there may be other factors that cause resultsnot to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate as actual resultsand future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue relianceon any forward-looking information. The Company undertakes no obligation to revise or update any forward-looking information other thanas required by law.
InvestorRelations Contacts:
Bitfarms
Tracy Krumme
SVP, Head of IR & Corp. Comms.
+1 786-671-5638
tkrumme@bitfarms.com
InnisfreeM&A Incorporated
Gabrielle Wolf / Scott Winter
+1 212-750-5833
LaurelHill Advisory Group
1-877-452-7184
416-304-0211
assistance@laurelhill.com
MediaContacts:
U.S.: Joele Frank,Wilkinson Brimmer Katcher
Dan Katcher or Joseph Sala
+1 212-355-4449
Québec:Tact
Louis-Martin Leclerc
+1 418-693-2425
lmleclerc@tactconseil.ca
6
Exhibit 99.2

Bitfarms Schedules Second Quarter2024 Conference Call on August 8^th^, 2024
TORONTO, Ontario and BROSSARD, Québec,August 1, 2024 -- Bitfarms Ltd. (NASDAQ/TSX: BITF), a global vertically integrated Bitcoin mining data center company, will report its second quarter 2024 financial results on Thursday, August 8^th^, before the market opens. Management will host a conference call on the same day at 8:00 am EST. All Q2 2024 materials will be available before the call and can be accessed on the ‘Financial Results’ section of the Bitfarms investor site.
Participants may join the live call by calling 888-506-0062 (domestic) or 973-528-0011 (international) and referencing access code 968924. If you do not have the code, you may reference the Bitfarms’ Q2 2024 results conference call.
The conference call will also be available via a live webcast. Please use this link to register.
A webcast replay can be accessed in the Events section of our Investor website approximately one hour after the call. An audio replay will be available through August 22, 2024, and can be accessed at 877-481-4010 (domestic), or 919-882-2331 (international), using access code 50787.
AboutBitfarms Ltd
Founded in 2017, Bitfarms is a global vertically integrated Bitcoin mining data center company that contributes its computational power to one or more mining pools from which it receives payment in Bitcoin. Bitfarms develops, owns, and operates vertically integrated mining facilities with in-house management and company-owned electrical engineering, installation service, and multiple onsite technical repair centers. The Company’s proprietary data analytics system delivers best-in-class operational performance and uptime.
Bitfarms currently has 12 operating Bitcoin data centers and two under development situated in four countries: Canada, the United States, Paraguay, and Argentina. Powered predominantly by environmentally friendly hydro-electric and long-term power contracts, Bitfarms is committed to using sustainable and often underutilized energy infrastructure.
To learn more about Bitfarms’ events, developments, and online communities:
| www.bitfarms.com |
|---|
https://www.facebook.com/bitfarms/
https://twitter.com/Bitfarms_io
https://www.instagram.com/bitfarms/
https://www.linkedin.com/company/bitfarms/
Investor RelationsContacts:
Bitfarms
Tracy Krumme
SVP, Head of IR & Corp. Comms.
+1 786-671-5638
tkrumme@bitfarms.com
Innisfree M&AIncorporated
Gabrielle Wolf / Scott Winter
+1 212-750-5833
Laurel Hill AdvisoryGroup
1-877-452-7184
416-304-0211
assistance@laurelhill.com
Media Contacts:
U.S.: Joele Frank, Wilkinson BrimmerKatcher
Dan Katcher or Joseph Sala
+1 212-355-4449
Québec: Tact
Louis-Martin Leclerc
+1 418-693-2425
lmleclerc@tactconseil.ca