6-K

Keel Infrastructure Corp. (KEEL)

6-K 2025-07-29 For: 2025-07-28
View Original
Added on April 06, 2026

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549


FORM 6-K


REPORT OF FOREIGN PRIVATEISSUER PURSUANT TO RULE 13a-16 OR 15d-16

UNDER THE SECURITIES EXCHANGE ACT OF 1934


For the month of July 2025


Commission File Number: 001-40370


BITFARMS LTD.

(Translation of registrant’s name into English)

110 Yonge Street, Suite 1601, Toronto,Ontario, Canada M5C 1T4

(Address of principal executive offices)

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.

Form 20-F ¨ Form 40-F x

DOCUMENTS INCLUDED AS PART OFTHIS FORM 6-K


On July 28, 2025, the Registrant filed with the Canadian Securities Regulatory Authorities on the System for Electronic Data Analysis and Retrieval + (SEDAR +) a material change report that includes a copy of a press release, a copy of which is attached hereto as Exhibit 99.1, which is incorporated by reference into the Registration Statements of Bitfarms Ltd. on Form F-10 (File No. 333-272989) and Form S-8 (File No. 333-278868 and File No. 333-285894), each as amended or supplemented.

See the Exhibits listed below.

Exhibits
Exhibit No. Description
99.1 Material Change Report dated July 28, 2025

SIGNATURE

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

BITFARMS LTD.
By: /s/ Ben Gagnon
Name: Ben Gagnon
Title: Chief Executive Officer
Date: July 28, 2025

Exhibit 99.1

FORM 51-102F3MATERIAL CHANGE REPORT


Item 1 Name and Address of Company


Bitfarms Ltd. (“Bitfarms” or the “Company”)

110 Yonge Street, Suite 1601

Toronto, Ontario M5C 1T4

Item 2 Date of Material Change


July 28, 2025

Item 3 News Release


The press release attached as Schedule “A” was released on July 28, 2025 by a newswire company in Canada.

Item 4 Summary of Material Change


The material change is described in the press release attached as Schedule “A”.

Item 5 Full Description of Material Change


The material change is described in the press release attached as Schedule “A”.

Item 6 Reliance of subsection 7.1(2) of National Instrument 51-102

Not applicable.

Item 7 Omitted Information


Not applicable.

Item 8 Executive Officer


Ben Gagnon

Chief Executive Officer

Bitfarms Ltd.

Bgagnon@bitfarms.com

Item 9 Date of Report


July 28, 2025.

Schedule “A”


Bitfarms Announces Second Principal ExecutiveOffice in NYC and Initiates Conversion to U.S. GAAP

Toronto, Ontario and New York, New York (July28, 2025) - Bitfarms Ltd. (Nasdaq/TSX: BITF) (the “Company”), a global energy and compute infrastructure company, today announced that the New York City office it acquired as part of the previous acquisition of Stronghold Digital Mining, Inc. will be identified as Bitfarms’ second Principal Executive Office (“PEO”) in its filings with the securities commissions in Canada and with the United States Securities and Exchange Commission. The Company is also planning to prepare its financial statements under U.S. Generally Accepted Accounting Principles (“U.S. GAAP”) to better align with other companies within their industry. This transition from IFRS Accounting Standards to U.S. GAAP is expected to commence with the annual consolidated financial statements for the fiscal year ending December 31, 2025.

CEO Ben Gagnon stated, “I am excited to announce Bitfarms’ Principal Executive Office in New York City and our conversion to U.S. GAAP reporting. Building off the successful rebalancing of our energy portfolio to ~70% North American MWs in Q1, these initiatives further advance our U.S. pivot and align with our HPC/AI growth strategy. Maintaining a U.S.-based PEO and transitioning to U.S. GAAP is expected to simplify our reporting processes, reduce administrative and legal costs, broaden our U.S. investor base, and improve our eligibility for inclusion in certain stock indices, among other potential benefits. We believe this strategic transition will better position Bitfarms to execute our HPC/AI growth strategy, driving improved operational efficiencies and maximizing shareholder value.”


About Bitfarms Ltd.


Founded in 2017, Bitfarms is a North American energy and compute infrastructure company that develops, owns, and operates vertically integrated data centers. Bitfarms currently operates 15 data centers situated in four countries, which currently mine Bitcoin: the United States, Canada, Argentina and Paraguay.

To learn more about Bitfarms’ events, developments, and online communities:

www.bitfarms.com

https://www.facebook.com/bitfarms/

http://x.com/Bitfarms_io

https://www.instagram.com/bitfarms/

https://www.linkedin.com/company/bitfarms/

Forward-Looking Statements

This news release contains certain “forward-lookinginformation” and “forward-looking statements” (collectively, “forward-looking information”) that are basedon expectations, estimates and projections as at the date of this news release and are covered by safe harbors under Canadian and UnitedStates securities laws. The statements and information in this release regarding the benefits of a second Principal Executive Office inthe U.S. and the transition to reporting financial results under U.S. Generally Accepted Accounting Principles, the North American energyand compute infrastructure strategy, opportunities relating to the Company’s HPC/AI strategy, the Company’s ability to drivegreater shareholder value, growth opportunities and prospects for the Company, and other statements regarding future growth, plans andobjectives of the Company are forward-looking information.

2

Any statements that involve discussions withrespect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but notalways using phrases such as “expects”, or “does not expect”, “is expected”, “anticipates”or “does not anticipate”, “plans”, “budget”, “scheduled”, “forecasts”, “estimates”,“prospects”, “believes” or “intends” or variations of such words and phrases or stating that certainactions, events or results “may” or “could”, “would”, “might” or “will” betaken to occur or be achieved) are not statements of historical fact and may be forward-looking information. This forward-looking informationis based on assumptions and estimates of management of Bitfarms at the time they were made, and involves known and unknown risks, uncertaintiesand other factors which may cause the actual results, performance, or achievements of Bitfarms to be materially different from any futureresults, performance or achievements expressed or implied by such forward-looking information. Such factors, risks and uncertainties include,among others: the risk that the anticipated benefits of a second Principal Executive Office fail to materialize in a timely manner orat all; the risk that the Company’s transition to reporting financial results under U.S. GAAP will require more time or cost morethan anticipated, or fail to occur at all; an inability to apply the Company’s data centers to HPC/AI opportunities on a profitablebasis; a failure to secure long-term contracts associated with HPC/AI customers on terms which are economic or at all; the constructionand operation of new facilities may not occur as currently planned, or at all; expansion of existing facilities may not materialize ascurrently anticipated, or at all; an inability to satisfy the Panther Creek location related milestones which are conditions to loan drawdownsunder the Macquarie Group financing facility; an inability to deploy the proceeds of the Macquarie Group financing facility to generatepositive returns at the Panther Creek location; the construction and operation of new facilities may not occur as currently planned, orat all; expansion of existing facilities may not materialize as currently anticipated, or at all; new miners may not perform up to expectations;revenue may not increase as currently anticipated, or at all; the ongoing ability to successfully mine digital currency is not assured;failure of the equipment upgrades to be installed and operated as planned; the availability of additional power may not occur as currentlyplanned, or at all; expansion may not materialize as currently anticipated, or at all; the power purchase agreements and economics thereofmay not be as advantageous as expected; potential environmental cost and regulatory penalties due to the operation of the former Strongholdplants which entail environmental risk and certain additional risk factors particular to the former business and operations of Strongholdincluding, land reclamation requirements may be burdensome and expensive, changes in tax credits related to coal refuse power generationcould have a material adverse effect on the business, financial condition, results of operations and future development efforts, competitionin power markets may have a material adverse effect on the results of operations, cash flows and the market value of the assets, the businessis subject to substantial energy regulation and may be adversely affected by legislative or regulatory changes, as well as liability under,or any future inability to comply with, existing or future energy regulations or requirements, the operations are subject to a numberof risks arising out of the threat of climate change, and environmental laws, energy transitions policies and initiatives and regulationsrelating to emissions and coal residue management, which could result in increased operating and capital costs and reduce the extent ofbusiness activities, operation of power generation facilities involves significant risks and hazards customary to the power industry thatcould have a material adverse effect on our revenues and results of operations, and there may not have adequate insurance to cover theserisks and hazards, employees, contractors, customers and the general public may be exposed to a risk of injury due to the nature of theoperations, limited experience with carbon capture programs and initiatives and dependence on third-parties, including consultants, contractorsand suppliers to develop and advance carbon capture programs and initiatives, and failure to properly manage these relationships, or thefailure of these consultants, contractors and suppliers to perform as expected, could have a material adverse effect on the business,prospects or operations; the digital currency market; the ability to successfully mine digital currency; it may not be possible to profitablyliquidate the current digital currency inventory, or at all; a decline in digital currency prices may have a significant negative impacton operations; an increase in network difficulty may have a significant negative impact on operations; the volatility of digital currencyprices; the anticipated growth and sustainability of hydroelectricity for the purposes of cryptocurrency mining in the applicable jurisdictions;the inability to maintain reliable and economical sources of power to operate cryptocurrency mining assets; the risks of an increase inelectricity costs, cost of natural gas, changes in currency exchange rates, energy curtailment or regulatory changes in the energy regimesin the jurisdictions in which Bitfarms operates and the potential adverse impact on profitability; future capital needs and the abilityto complete current and future financings, including Bitfarms’ ability to utilize an at-the-market offering program ( “ATMProgram”) and the prices at which securities may be sold in such ATM Program, as well as capital market conditions in general; sharedilution resulting from an ATM Program and from other equity issuances; the risks of debt leverage and the ability to service and eventuallyrepay the Macquarie Group financing facility; volatile securities markets impacting security pricing unrelated to operating performance;the risk that a material weakness in internal control over financial reporting could result in a misstatement of financial position thatmay lead to a material misstatement of the annual or interim consolidated financial statements if not prevented or detected on a timelybasis; risks related to the Company ceasing to qualify as an “emerging growth company”; risks related to unsolicited investorinterest, takeover proposals, shareholder activism or proxy contests relating to the election of directors; risks relating to lawsuitsand other legal proceedings and challenges; historical prices of digital currencies and the ability to mine digital currencies that willbe consistent with historical prices; and the adoption or expansion of any regulation or law that will prevent Bitfarms from operatingits business, or make it more costly to do so. For further information concerning these and other risks and uncertainties, refer to Bitfarms’filings on www.sedarplus.ca (which are also available on the website of the U.S. Securities and Exchange Commission (the “SEC")at www.sec.gov), including the Company's annual information form for the year ended December 31, 2024, management’s discussion &analysis for the year-ended December 31, 2024 and the management's discussion and analysis for the three months ended March 31, 2025.Although Bitfarms has attempted to identify important factors that could cause actual results to differ materially from those expressedin forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended, includingfactors that are currently unknown to or deemed immaterial by Bitfarms. There can be no assurance that such statements will prove to beaccurate as actual results, and future events could differ materially from those anticipated in such statements. Accordingly, readersshould not place undue reliance on any forward-looking information. Bitfarms does not undertake any obligation to revise or update anyforward-looking information other than as required by law. Trading in the securities of the Company should be considered highly speculative.No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. Neitherthe Toronto Stock Exchange, Nasdaq, or any other securities exchange or regulatory authority accepts responsibility for the adequacy oraccuracy of this release.


Investor Relations Contact:


Laine Yonker

lyonker@bitfarms.com


Media Contact:


Caroline Brady Baker

cbaker@bitfarms.com


3