6-K

KINROSS GOLD CORP (KGC)

6-K 2025-03-27 For: 2025-03-27
View Original
Added on April 12, 2026

SECURITIES AND EXCHANGE COMMISSION

Washington, DC 20549

FORM 6-K

REPORT OF FOREIGN PRIVATE ISSUER

PURSUANT TO RULE 13a-16 OR 15d-16

UNDER THE SECURITIES EXCHANGE ACT OF 1934

For the month of March, 2025

Commission File Number: 001-13382

KINROSS GOLD CORPORATION

(Translation of registrant's name into English)

17^th^ Floor, 25 York Street,

Toronto, Ontario M5J 2V5

(Address of principal executive offices)

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40F:

Form 20-F  ¨      Form 40-F  x

This Current Report on Form 6-K, dated March 27, 2025 is specifically incorporated by reference into Kinross Gold Corporation's Registration Statements on Form S-8 [Registration No. 333-262966 filed on February 24, 2022, Registration No. 333-217099 filed on April 3, 2017 and Registration Nos. 333-180824, 333-180823 and 333-180822 filed on April 19, 2012.]

Page 2

This report on Form 6-K is being furnished for the sole purpose of providing a copy of the Technical Report filed for Kinross Gold Corporation’s Tasiast Mine, along with the required certificates and consents as filed on SEDAR, dated March 27, 2025.

INDEX

Table of Contents

SIGNATURES

EXHIBIT INDEX

99.1 Technical Report dated March 27, 2025 with respect to the Tasiast Mine, Mauritania (“Technical Report”).
99.2 Certificate of Nicos Pfeiffer dated March 27, 2025 with respect to the Technical report as filed on SEDAR.
--- ---
99.3 Consent of Nicos Pfeiffer dated March 27, 2025 with respect to the Technical report as filed on SEDAR.
--- ---
99.4 Consent of Nicos Pfeiffer dated March 27, 2025 for the US filing of the Technical Report.
--- ---
99.5 Certificate of Graham Long dated March 27, 2025 with respect to the Technical report as filed on SEDAR.
--- ---
99.6 Consent of Graham Long dated March 27, 2025 with respect to the Technical report as filed on SEDAR.
--- ---
99.7 Consent of Graham Long dated March 27, 2025 for the US filing of the Technical Report.
--- ---
99.8 Certificate of Yves Breau dated March 27, 2025 with respect to the Technical report as filed on SEDAR.
--- ---
99.9 Consent of Yves Breau dated March 27, 2025 with respect to the Technical report as filed on SEDAR.
--- ---
99.10 Consent of Yves Breau dated March 27, 2025 for the US filing of the Technical Report.
--- ---
99.11 Certificate of Agung Prawasono dated March 27, 2025 with respect to the Technical report as filed on SEDAR.
--- ---
99.12 Consent of Agung Prawasono dated March 27, 2025 with respect to the Technical report as filed on SEDAR.
--- ---
99.13 Consent of Agung Prawasono dated March 27, 2025 for the US filing of the Technical Report.
--- ---
99.14 Certificate of Kevin van Warmerdam dated March 27, 2025 with respect to the Technical report as filed on SEDAR.
--- ---
99.15 Consent of Kevin van Warmerdam dated March 27, 2025 with respect to the Technical report as filed on SEDAR.
--- ---
99.16 Consent of Kevin van Warmerdam dated March 27, 2025 for the US filing of the Technical Report.
--- ---
99.17 Certificate of Jacob Brown dated March 27, 2025 with respect to the Technical report as filed on SEDAR.
--- ---
99.18 Consent of Jacob Brown dated March 27, 2025 with respect to the Technical report as filed on SEDAR.
--- ---
99.19 Consent of Jacob Brown dated March 27, 2025 for the US filing of the Technical Report.
--- ---

Page 3

SIGNATURES

Pursuant to the requirements of Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

KINROSS GOLD CORPORATION
Signed: //Lucas R. Crosby//
Senior Vice President, General Counsel

March 27, 2025

Exhibit 99.1

Tasiast Mine

Mauritania

National Instrument 43-101 Technical Report

Prepared for:
Kinross Gold<br> Corporation
Prepared by:
Kinross Gold<br> Corporation
Effective Date: December 31, 2024
Signature Date: March 27, 2025
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
---

Contents

1.    SUMMARY 1
1.1 Executive<br> Summary 1
1.2 Technical Summary 4
2.    INTRODUCTION 14
2.1 Qualified Persons 15
2.2 Sources of Information 16
2.3 Effective Date 16
2.4 List of Abbreviations 17
3.    RELIANCE<br> ON OTHER EXPERTS 18
4.    PROPERTY<br> DESCRIPTION AND LOCATION 19
4.1 Location 19
4.2 Mineral Tenure 22
4.3 Fees, Royalties, Duties,<br> and Taxes 26
5.    ACCESSIBILITY,<br> CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY 29
5.1 Accessibility 29
5.2 Climate 29
5.3 Local Resources and Infrastructure 29
5.4 Physiography and Environment 30
6.    HISTORY 31
6.1 Tenure History 31
6.2 Project History 31
7.    GEOLOGICAL<br> SETTING 34
7.1 Regional Geology 34
7.2 District Geology 36
7.3 Deposit Geology 38
7.4 Structural Geology 43
7.5 Mineralization and Alteration 46
8.    DEPOSIT<br> TYPES 51
9.    EXPLORATION 52
9.1 Grids and Surveys 52
9.2 Geological and Regolith<br> Mapping 52
9.3 Geochemistry Sampling 52
9.4 Geophysics 53
9.5 Pits and Trenches 60
9.6 Petrology, Mineralogy,<br> and Other Research Studies 60
9.7 Exploration Potential 60
10.  DRILLING 63
10.1 Summary 63
10.2 Historical Drilling 67
10.3 Recent Drilling (2010–2024) 68
Page i
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
10.4 Logging Procedures 68
--- --- ---
10.5 Collar Surveys 68
10.6 Downhole Surveys 69
10.7 Recovery 69
10.8 Drill Hole Orientation 69
10.9 Geotechnical, Hydrogeological,<br> and Metallurgical Drilling 70
10.10 Comments on Drill Programs 71
11.  SAMPLE<br> PREPARATION, ANALYSES, AND SECURITY 73
11.1 Sampling Method and Approach 73
11.2 Analytical Laboratories 76
11.3 Sample Preparation 77
11.4 Sample Analysis 78
11.5 Independent Review Work<br> - Quality Assurance and Quality Control 79
11.6 Data and Sample Security 94
11.7 Comment on Sample Collection,<br> Preparation, Analysis, and Security 97
12.  DATA<br> VERIFICATION 99
12.1 Verification in Support<br> of Technical Reports 99
12.2 Comment on Data Verification 102
13.  MINERAL<br> PROCESSING AND METALLURGICAL TESTING 103
13.1 Mineralogy 103
13.2 Metallurgical Test Work 103
14.  MINERAL<br> RESOURCE ESTIMATE 116
14.1 Summary 116
14.2 Comparison to Previous<br> Estimate 120
14.3 Mineral Resource Cut-off<br> Grades 123
14.4 Resource Database 124
14.5 Geological Interpretation 124
14.6 Lithology and Redox Domains 130
14.7 Resource Assays 132
14.8 Variography 138
14.9 Density 141
14.10 Search Strategy and Estimation<br> Parameters 142
14.11 Block Model 144
14.12 Block Model Validation 146
14.13 Classification 153
15.  MINERAL<br> RESERVE ESTIMATE 157
15.1 Basis of Reserve Estimate<br> and Pit Optimization 159
16.  MINING<br> METHODS 162
16.1 Mining Operations 162
16.2 Mine Design 165
16.3 Schedules 176
16.4 Mine Equipment 184
16.5 Personnel Requirements 190
17.  RECOVERY<br> METHODS 192
17.1 Water Management 192
17.2 Gold Recovery 192
17.3 Current CIL Processing<br> Plant – The ‘24K New CIL’ Project 192
Page ii
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
18.  PROJECT<br> INFRASTRUCTURE 206
--- --- ---
18.1 Water Supply 206
18.2 Power Supply 206
18.3 Waste Management 207
18.4 Tasiast Team Village 207
18.5 Service and Administration<br> Buildings 207
18.6 Accessibility 208
19.  MARKET<br> STUDIES AND CONTRACTS 209
20.  ENVIRONMENTAL<br> STUDIES, PERMITTING, AND SOCIAL OR COMMUNITY IMPACT 210
20.1 Environmental Studies 210
20.2 Permitting 211
20.3 Socio-Economics 213
21.  CAPITAL<br> AND OPERATING COSTS 214
21.1 Capital Costs 214
21.2 Estimate Basis –<br> Non-sustaining and Sustaining Capitalized Stripping 216
21.3 Estimate Basis –<br> Non-sustaining and Sustaining Mobile Equipment Maintenance 217
21.4 Estimate Basis –<br> Mill Sustaining Capital 217
21.5 Estimate Basis –<br> Tailings Sustaining Capital 218
21.6 Operating Costs 218
22.  ECONOMIC<br> ANALYSIS 222
23.  ADJACENT<br> PROPERTIES 223
24.  OTHER<br> RELEVANT DATA AND INFORMATION 224
25.  INTERPRETATION<br> AND CONCLUSIONS 225
26.  RECOMMENDATIONS 226
27.  REFERENCES 227
28.  DATE<br> AND SIGNATURE PAGE 231
29.  CERTIFICATE<br> OF QUALIFIED PERSON 232
29.1 Nicos Pfeiffer 232
29.2 Agung Prawasono 235
29.3 Yves Breau 237
29.4 Graham Long 239
29.5 Jacob Brown 241
29.6 Kevin van Warmerdam 243

Tables

Table<br> 1-1: Summary of Project Mineral Reserves – December 31, 2024 2
Table 1-2: Summary<br> of Project Mineral Resources as at December 31, 2024 3
Table 1-3: Tasiast<br> Mineral Resource estimate as at December 31, 2024 8
Table 1-4: Summary<br> of Project Mineral Reserves – December 31, 2024 10
Table 1-5: Operating<br> cost estimates (January 1, 2025) 13
Page iii
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
Table<br> 2-1: Qualified Persons and their responsibilities 15
--- ---
Table<br> 4-1: Mineral tenure summary – Tasiast Property 23
Table<br> 4-2: Permit boundary coordinates 23
Table<br> 4-3: Permit durations under the 1999 Code applicable to Tasiast 25
Table<br> 4-4: Applicable fees, royalties, duties and taxes 27
Table<br> 6-1: Production summary 33
Table<br> 7-1: West Branch alteration codes and descriptions 46
Table<br> 10-1: Kinross regional drill hole summary 64
Table<br> 11-1: QA/QC samples by laboratory 84
Table<br> 11-2: 2007-2017 Resource QA/QC results 87
Table<br> 11-3: Distribution of CRMs by deposit: 2013–2024 88
Table<br> 11-4: Summary of CRM samples used in the 2013 to 2024 QA/QC programs 89
Table<br> 11-5: Insertion of blank samples by deposit: 2013–2024 93
Table<br> 13-1: Mill feed plan by lithology 105
Table<br> 13-2: Comminution characteristics by lithology 107
Table<br> 13-3: Test work results (SGS 2022 and SGS 2024) 112
Table<br> 14-1: Tasiast Mineral Resource estimate as at December 31, 2024 118
Table<br> 14-2: Year over year changes to the Mineral Resources 121
Table<br> 14-3: Comparison between the current and previous MRE 122
Table<br> 14-4: Cut-off grade inputs and assumptions 123
Table<br> 14-5: Mineralized domains – West Branch 125
Table<br> 14-6: Mineralized domains – Piment and Prolongation 126
Table<br> 14-7: Lithology and redox codes 131
Table<br> 14-8: Gold assay statistics before and after compositing – West Branch 133
Table<br> 14-9: Gold assay statistics before and after compositing – Piment and Prolongation 134
Table<br> 14-10: Composited and capped gold assay statistics – West Branch 135
Table<br> 14-11: Composited and capped gold assay statistics – Piment and Prolongation 136
Table<br> 14-12: Domain groupings for variogram analysis 139
Table<br> 14-13: Gold variogram model results per domain – West Branch 140
Table<br> 14-14: Assigned density values (t/m3) – West Branch 142
Table<br> 14-15: Assigned density values (t/m3) – Piment and Prolongation 142
Table<br> 14-16: Search ellipse dimensions 143
Table<br> 14-17: Sample selection plan 144
Table<br> 14-18: Block model dimensions 145
Table<br> 14-19: Classification criteria 154
Table<br> 15-1: Tasiast Mineral Reserve Estimate as at December 31, 2024 158
Table<br> 15-2: Pit optimization parameters 160
Table<br> 15-3: Process Recoveries 161
Table<br> 16-1: Material routing 164
Table<br> 16-2: 24 kt/d total mobile equipment fleet 165
Table<br> 16-3: Slope FoS Criteria 167
Table<br> 16-4: Geotechnical design parameters - Piment Zone 168
Table<br> 16-5: Geotechnical design parameters - West Branch Zone 169
Table<br> 16-6: Double-lane haul road dimensions 173
Table<br> 16-7: Scheduling constraints 181
Page iv
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
Table<br> 16-8: Mine Production Schedule 182
--- ---
Table<br> 16-9: CIL process plant feed schedule 183
Table<br> 16-10: Payload sizes for planning 185
Table<br> 16-11: Haul truck speeds 185
Table<br> 16-12: Loading unit planned productivities 186
Table<br> 16-13: Front-end Loader (FEL) planned productivities 186
Table<br> 16-14: Breakdown of cycle time components 186
Table<br> 16-15: Planned drill productivities 188
Table<br> 16-16: Mining personnel by function by year 190
Table<br> 16-17: National and expatriate mining personnel by year 191
Table<br> 17-1: Key process design criteria 196
Table<br> 17-2: 2024 CIL plant quarterly performance and recovery curve details 197
Table<br> 17-3: CIL gold recovery equation 197
Table<br> 20-1: Key operating permits and environmental assessments 212
Table<br> 21-1: Annual sustaining capital 215
Table<br> 21-2: Annual non-sustaining capital 216
Table<br> 21-3: Basis of estimate – operating costs 219
Table<br> 21-4: Operating cost estimates (January 1, 2025 forward) 221

Figures

Figure<br> 4-1: Location map 20
Figure<br> 4-2: Property Map 21
Figure<br> 7-1: Geology of the West African Craton 35
Figure<br> 7-2: Tasiast District tectonic map - Granite-Greenstone Belts 37
Figure<br> 7-3: Precambrian stratigraphy of the Aouéouat Greenstone Belt 38
Figure<br> 7-4: Main lithologies identified in the West Branch area 39
Figure<br> 7-5: Near mine geology model (looking down at 4,950 m elev) 40
Figure<br> 7-6: Lithology level plan at West Branch – looking down at 4,900 m elev 42
Figure<br> 7-7: Lithology cross section at West Branch – looking north at 71,500 N 42
Figure<br> 7-8: Local scale shear framework and form surface map 44
Figure<br> 7-9: Structural maps of the northern pits (Piment; a, b) and southern pits (West Branch, Turek; c, d) 45
Figure<br> 7-10: Photographs illustrating mineralization styles 47
Figure<br> 7-11: West Branch 4980 m bench high-grade vein 48
Figure<br> 7-12: West Branch 4980 m bench showing mapped GDI (orange) and high-grade vein (black) 49
Figure<br> 9-1: Depth slice (880 m) of the Bouguer gravity 1VD 54
Figure<br> 9-2: Senisa target area of IP surveys 55
Figure<br> 9-3: Depth slice (100 m) of IP chargeability at C23 56
Figure<br> 9-4: Depth slice (200 m) of IP chargeability at GRD 57
Figure<br> 9-5: Depth Slice (200 m) of IP chargeability at KHN 58
Figure<br> 9-6: Depth slice (250 m) of IP chargeability at Morris 59
Figure<br> 9-7: C23, KHN, and GRD targets and soils anomalies (Red Back data) 62
Figure<br> 10-1: Drill hole collar map 66
Figure<br> 11-1: Standard control plot for Standard G305-2 from SGS Morila 85
Page v
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
Figure<br> 11-2: Summary of QC sample swaps by year 86
--- ---
Figure<br> 11-3: Tasiast CRM Z-Score 90
Figure<br> 11-4: Control chart of CRM G912-7 for gold in ALS: 2015–2024 91
Figure<br> 11-5: Control chart of CRM OREAS-16a for gold in ALS: 201 –2024 91
Figure<br> 11-6: Control chart of CRM G910-3 for gold in ALS: 2014–2024 92
Figure<br> 11-7: 2013 - 2024 results of coarse blank samples in ALS 93
Figure<br> 11-8: Representation of different system architectures for Fusion 95
Figure<br> 13-1: Comminution sample locations 106
Figure<br> 13-2: Variation of SAG milling power index with vertical depth 108
Figure<br> 13-3: Gold recovery as a function of grind and leach retention 109
Figure<br> 13-4: Gold grade vs. recovery relationship 110
Figure<br> 13-5: Grade-recovery comparison of Piment, Fennec, and West Branch test work 114
Figure<br> 14-1: Length-weighted gold distribution indicating the 0.15 g/t modelling threshold at West Branch 127
Figure<br> 14-2: Mineralized zones and envelopes – West Branch 128
Figure<br> 14-3: Mineralized zones and envelopes – Piment 129
Figure<br> 14-4: Mineralized domains and envelopes – Prolongation 130
Figure<br> 14-5: Capping analysis for Domain 3300 – West Branch 137
Figure<br> 14-6: Capping analysis for Domain 100 – Piment and Prolongation 138
Figure<br> 14-7: Gold variogram for Domain 3300 – West Branch 141
Figure<br> 14-8: Block model extents 145
Figure<br> 14-9: Visual comparison of West Branch composite and block model gold grades 147
Figure<br> 14-10: Visual comparison of Piment composite and block model gold grades 148
Figure<br> 14-11: Visual comparison of Prolongation composite and block model gold grades 149
Figure<br> 14-12: Swath plot for Domain 3300 and Domain 100 150
Figure<br> 14-13: Change of support QQ plot for Domain 3300 – West Branch 151
Figure<br> 14-14: Swath plot comparing the resource models and short-term model – West Branch 152
Figure<br> 14-15: QQ plot comparing the 2022 resource model and short-term model – West Branch 152
Figure<br> 14-16: Classification – West Branch 155
Figure<br> 14-17: Classification – Piment and Prolongation 156
Figure<br> 16-1: West Branch Pit - looking southwest 163
Figure<br> 16-2: Plan view of Tasiast site 166
Figure<br> 16-3: Rock mass rating vs. depth (all West Branch data) 165
Figure<br> 16-4: Sensitivity analysis – ore tonnes 171
Figure<br> 16-5: Sensitivity analysis – contained gold 171
Figure<br> 16-6: Haul road profile 173
Figure<br> 16-7: West Branch pit isometric view 174
Figure<br> 16-8: Piment pit isometric view 174
Figure<br> 16-9: Piment satellite pit isometric view 175
Figure<br> 16-10: Fennec satellite pit isometric view 175
Figure<br> 16-11: West Branch (WB) pit phasing 177
Figure<br> 16-12: Piment (PM) pit phasing 178
Figure<br> 16-13: West Branch production advance section view 179
Figure<br> 16-14: Annual mining rate by pit 180
Figure<br> 16-15: LOM stockpile balances and depletion 184
Page vi
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
Figure<br> 16-16: Annual hauling requirements 187
--- ---
Figure<br> 16-17: Loader requirements by year 188
Figure<br> 17-1: Simplified process flowsheet 194
Figure<br> 17-2: ‘24K New CIL’ Project plant layout 195
Figure<br> 17-3: Primary Crushing 198
Figure<br> 17-4: Ore stockpile 198
Figure<br> 17-5: SAG circuit – with new vibrating screen and cyclones installed in ‘24K’ Project 199
Figure<br> 17-6: Gravity Concentration and ILR 200
Figure<br> 17-7: New Leach Tanks installed as part of the ‘21K’ and ‘24K’ Projects 201
Figure<br> 17-8: New Tailings thickener 203
Figure<br> 17-9: Sodium cyanide mixing layout 205
Page vii
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
1. Summary
--- ---
1.1 Executive Summary
--- ---

Kinross Gold Corporation (Kinross) has prepared a Technical Report for the wholly-owned Tasiast Mine (Tasiast or the Complex) located in the Islamic Republic of Mauritania (Mauritania), Africa. The purpose of this Technical Report is to support disclosure of Mineral Resources and Mineral Reserves for the Complex, inclusive of the West Branch, Piment, Prolongation, and Fennec deposits (Mineral Resources) and West Branch, Piment, and Fennec deposits (Mineral Reserves), with an effective date of December 31, 2024. The Technical Report conforms to National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101) and has an effective date of December 31, 2024.

The Complex and the exploitation permit are owned by Tasiast Mauritanie Limited S.A. (TMLSA). SENISA (Société d’Extraction du Nord de l’Inchiri S.A., a sister company of TMLSA) holds two mining permits (for the Tmeimichat and Imkebden areas)that are contiguous with the Tasiast mining permit land (collectively, the Tasiast Lands). As part of the conversion process, Kinross has undertaken to transfer to the Government of Mauritania a 10% carried interest in SENISA. Kinross acquired TMLSA, including the Tasiast Lands, through its acquisition of Red Back Mining Inc (Red Back) in September 2010. There are exploration prospects in all three exploitation permit locations.

The current configuration of the Tasiast carbon-in-leach (CIL) plant has proven capable of processing approximately 24 thousand tonnes per day (kt/d). In September 2019, Kinross completed a feasibility study (Tasiast ‘24K’ Project) to incrementally increase throughput capacity at Tasiast from approximately 15 kt/d to 24 kt/d – which included the intermediary step to 21 kt/d (‘21K’ Project) The project (‘24K’ Project) was completed in 2023 with throughput rates increased to 24 kt/d on a daily basis. Additionally, the ‘24K New CIL’ Project was executed in 2024, replacing the previous CIL circuit with new tanks of similar design with the goal of extending their reliability and operation through the life of mine (LOM). The capital-efficient projects have increased production, lowered costs, and generated significant cash flow and attractive returns.

In late 2023, Kinross completed the development of its photovoltaic solar power plant at Tasiast with power generation capacity of 34 MW and a battery system of 18 MW. The Complex is part of Kinross’ efforts to reduce its greenhouse gas (GHG) emissions and provides approximately 20% of the site’s power. The Tasiast solar project is expected to generate positive returns and to reduce GHG emissions by approximately 530 kt over the LOM, which could save approximately 180 million litres of fuel over the same period. The project is expected to contribute to the Government of Mauritania’s GHG reduction targets in the country.

Page 1
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

To date, 15,862 drill holes (14,763 RC, 869 diamond core (DD), and 230 RC pre-collar with DD tail (RC-DD)) for an aggregate total of 1,713,081 m have been completed within the three exploitation licences that constitute the Tasiast Lands: Guelb El Ghaîcha, Imkebden, and Tmeimichat. Drilling activities were conducted by various drilling contractors and supervised by geological staff of the mine operator.

Commercial production of gold at Tasiast began in January 2008 under Red Back, and as of December 31, 2024, approximately five million ounces have been produced by Tasiast.

Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards for Mineral Resources and Mineral Reserves dated May 10, 2014 (CIM (2014) Definitions) were followed for Mineral Resources and Mineral Reserves.

Mineral Reserves were estimated for three deposits at the Complex: West Branch, Piment, and Fennec, and are summarized in Table 1-1.

Table 1-1: Summary of Project Mineral Reserves – December 31, 2024

Classification Tonnes (kt) Grade (g/t Au) Gold Ounces (koz)
Proven 14,819 1.34 640
Proven Stockpiles 42,542 0.99 1,361
Subtotal 57,361 1.08 2,000
Probable 45,471 1.85 2,705
TOTAL P&P 102,831 1.42 4,705

Notes:

1. CIM (2014) Definitions were followed for Mineral Reserves.
2. Mineral Reserves are limited to blocks within the reserve pit design<br> and within mineable panels/polygons within which blocks meet an average cut-off grade of<br> 0.6 g/t Au and consider ore loss, dilution, and mining selectivity.
--- ---
3. Mineral Reserves are estimated using an average long-term gold price<br> of US$1,600 per ounce.
--- ---
4. Bulk density is assigned by oxidation state and lithology.
--- ---
5. Numbers may not add due to rounding.
--- ---

Mineral Resources were estimated for four areas at the Mine: West Branch, Piment, Prolongation, and Fennec, and are summarized in Table 1-2 with an effective date of December 31, 2024.

Page 2
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 1-2: Summary of Project Mineral Resourcesas at December 31, 2024

Classification Tonnes (kt) Grade (g/t Au) Gold Ounces (koz)
Measured 21,296 0.70 478
Indicated 53,255 1.10 1,887
TOTAL M&I 74,550 0.99 2,365
Inferred 21,047 2.41 1,632

Notes:

1. CIM (2014) Definitions were followed for Mineral Resources.
2. Mineral Resources are estimated using a long-term gold price of US$2,000<br> per ounce.
--- ---
3. Open pit Mineral Resources are constrained within an optimized pit shell<br> reported to cut-off grades ranging from 0.39 g/t Au to 0.50 g/t Au.
--- ---
4. Underground Mineral Resources are constrained within resource panels<br> below the optimized pit shell which consider a minimum thickness of 2.5 m and a cut-off grade<br> of 1.8 g/t Au. Crown pillar resource panels are factored to represent a 100% extraction limit<br> at West Branch.
--- ---
5. Bulk density is assigned by oxidation state and lithology.
--- ---
6. Mineral Resources are exclusive of Mineral Reserves.
--- ---
7. Mineral Resources that are not Mineral Reserves do not have demonstrated<br> economic viability.
--- ---
8. Numbers may not add due to rounding.
--- ---

Conclusions

· Tasiast<br> is viewed as a long-term strategic asset for Kinross, located in a district that is believed<br> to have significant future potential.
· The<br> Tasiast gold deposits fall into the broad category of orogenic gold deposits. Tasiast gold<br> deposits are hosted in Archaean volcanic-sedimentary sequences that have been deformed and<br> metamorphosed to lower amphibolite peak metamorphic grade. Mineralization is both structurally<br> and lithologically controlled and is epigenetic in style.
--- ---
· The<br> Complex is currently operated as an open pit. Mineral Resources include both open pit and<br> underground conceptual scenarios.
--- ---
· There<br> is a good understanding of the geology and the nature of gold mineralization at the Complex.<br> The lithology model represents the support data well and it is developed using appropriate<br> resolution.
--- ---
· The<br> Mineral Resource estimate is of sufficient quality to support public disclosure and is supported<br> by best practice guidelines.
--- ---
Page 3
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Recommendations

1. Foster the already-strong Continuous Improvement<br> culture, looking for further opportunities to improve operating and cost performance in the<br> mine, plant, and administration. In particular, focus on opportunities to add production<br> to the 2025 to 2027 window while stripping is ongoing at West Branch 5.
2. Continue to explore the underground potential<br> at Tasiast. High potential exists to continue to expand upon underground resources at Tasiast<br> at West Branch and Piment but also to establish underground higher-grade resources at Prolongation.
--- ---
3. Evaluate further push backs at West Branch<br> and other open pits given the elevated gold price environment.
--- ---
4. Evaluate opportunities to strategically<br> stockpile lower grade material, which could be processed at the end of the mine life in a<br> higher metal price environment. Furthermore, this lower grade material could be used to keep<br> the mill full, if successful in converting the current underground resource. At YE 2024,<br> Tasiast added 152 koz of low grade which will be stockpiled for the end of mine life. Future<br> mine plans should look to add this to the back end of mine life, as well as evaluate other<br> opportunities.
--- ---
5. Continue to explore the addition of other<br> satellite ore bodies to the mine plan such as C67 and C68. The recent addition of Fennec<br> to the mine plan highlights the success that can come from detailed technical review of some<br> of these higher-grade satellite opportunities.
--- ---
6. Given the positive reconciliation of 106%<br> on F3 ounces seen in 2024, continue to drill targeting higher grade plunge controlled mineralization<br> in the West Branch 5 push back.
--- ---
1.2 Technical Summary
--- ---

Property Description

The Complex is located in northwestern Mauritania, approximately 300 km north of the capital Nouakchott and 250 km southeast of the major city of Nouadhibou. The Tasiast Lands are accessed from Nouakchott by using the paved Nouakchott to Nouadhibou highway for 370 km and then via 66 km of graded mine access road, which is maintained by TMLSA. There is an airstrip at the Complex that is used for light aircraft travelling to and from Nouakchott.

Page 4
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Mining operations commenced in 2007, with commercial production reached in January 2008. Infrastructure on site supports an open pit mining operation and associated processing facilities consisting of a CIL mill and a run of mine (ROM) dump leach.

Land Tenure

TMLSA holds a valid exploitation permit, 229C2 (Guelb El Ghaîcha), covering 312 km^2^, granted in January 2004 and valid for a period of 30 years. The mining operations and infrastructure lie entirely within the lands subject to the exploitation permit. The exploitation permit is located centrally within two additional contiguous mining permits (totalling 1,597 km^2^), each of which is in good standing. The Tasiast Lands fall within the Inchiri and Dakhlet Nouadhibou districts, with 229C2 within the Inchiri District only.

Surface rights are granted along with permit 229C2 and are paid annually as determined by decree under the Mauritanian Mining Code. Surface rights for the permits are in good standing.

The operation’s water supply is located 64 km west of the Complex and consists of a bore field in a semi-saline aquifer. Water is pumped from the bore field to the Complex. The Tasiast permit, issued May 7, 2017 by the Ministry of Hydraulics and Sanitation, allows abstraction at a maximum rate of 30,000 m^3^/d through to December 31, 2034.

History

Exploration programs have included geological and regolith mapping, satellite image interpretation, airborne and ground magnetic geophysical surveys, soil, rock chip, and grab geochemical sampling, trenching, RC and core drilling, engineering studies, metallurgical test work, and specialist geological studies such as ore and alteration petrography. Work was completed by the Office Mauritanien de Recherches Géologiques (OMRG), Normandy LaSource Development Ltd. (NLSD), Midas Gold plc. (Midas), Geomaque Explorations Inc. (Geomaque), Defiance Mining Corporation (Defiance), Rio Narcea Gold Mines Ltd. (Rio Narcea), Red Back, and Kinross.

Geological Setting and Mineralization

The Tasiast district is situated in the southwestern corner of the Reguibat Shield, which is a northeast-trending crustal block of the West African Craton. The Reguibat Shield contains the oldest rocks in Mauritania and consists of two major subdivisions separated by a crustal-scale shear zone representing a major accretionary boundary. The southwestern part (which hosts the Tasiast deposits) consists of Mesoarchean to Paleoproterozoic rocks that include high-grade granite-gneiss and greenstone belt assemblages. The northeastern part of the shield consists of younger Paleoproterozoic to Neoproterozoic successions, which hosts many orogenic gold occurrences in the West African Craton. This region is characterized by a series of volcano-sedimentary belts and associated batholithic-scale granitic intrusive suites of different ages cut by major shear zones.

Page 5
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

The district scale geology is characterized by basement rocks, largely composed of orthogneiss, overlain by deformed north-striking metavolcanic and metasedimentary successions intruded by stocks and plutons of mafic to intermediate composition (granite-greenstone belts). All the rock units are cut by unfoliated and post-mineral mafic (gabbroic) dykes.

The Tasiast Mine consists of two deposit areas hosted within distinctly different rock types, both situated within the hanging wall of the Tasiast thrust. The Piment deposits are hosted within metasedimentary rocks including metaturbidites and banded iron formation. The West Branch geology succession comprises mafic to felsic volcanic sequences, iron-rich formations and clastic units that have undergone mid greenschist to lower amphibolite facies metamorphism and multiple deformation events.

The Tasiast gold deposits fall into the broad category of orogenic gold deposits. The regional geological setting and deposit features at Tasiast are similar to other well known Archaean lode gold deposits hosted along greenstone belts in granitoid- greenstone terranes.

Exploration

To date, 15,953 drill holes (14,849 RC, 874 diamond core (DD), and 230 RC pre-collar with DD tail (RC-DD)) for an aggregate total of 1,725,424 mhave been completed within the three mining licences of Guelb El Ghaîcha, Imkebden, and Tmeimichat. Drilling activities were conducted by various drilling contractors and supervised by geological staff of the mine operator.

The Complex area has significant exploration potential to delineate additional resources both around the Tasiast mine pits (near mine exploration) and within the wider district (generative exploration).

Exploration efforts to date have discovered additional prospects, gold deposits, and mineral resources along strike to the north and to the south of the main Tasiast Complex area (West Branch and Piment-Prolongation), and generally along the Aouéouat (Tasiast) belt. The deformed greenstone rocks to the west (Imkebden-Kneiffissat) of the Aouéouat belt are notable in that they host quartz-carbonate veins with anomalous gold values, however, to date no significant deposits or mineral resources have been defined.

Beyond 25 km from the Tasiast operation, within the northern extents of the Imkebden and Tmeimichat exploitation permits, there are several gold exploration prospects that are pending follow-up exploration and drilling; of note are C23, Kneiffissat, and Grindstone. These prospects have significant surface geochemical footprints and are considered highly prospective.

Page 6
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Mineral Resources

The Mineral Resource estimate (MRE) is defined by five mineralized domains for West Branch and twelve mineralized domains for Piment and Prolongation. Each domain comprises an outer shear zone or mineralized envelope modelled as tabular veins, and an inner mineralized sub-domain modelled as an indicator interpolant. The mineralized zones were modelled using a grade threshold of 0.15 g/t Au as a guide, with logging data used in the absence of mineralization.

Samples were composited to two metres within each domain with capping done, per domain, thereafter. Capped values were estimated into sub-blocked models using a three-pass ordinary kriging (OK) approach for the mineralized zones and inverse distance squared (ID^2^) for the waste zone. The model was validated using a combination of methods including visual comparison of block estimates and composites, swath plots and change-of-support checks, using the nearest neighbour (NN) de-clustered distribution, as well as visual and statistical validation against the short-term model estimated using grade-control data.

Classification of Mineral Resources considered the confidence in geological continuity, drill hole spacing, proximity to the current mining areas, and grade control drilling. Areas characterized by drill hole spacings of approximately 30 m define areas classified as Measured for West Branch, Piment, and Prolongation. Spacings of approximately 60 m to 70 m support areas classified as Indicated for West Branch and 70 m for Piment and Prolongation. For the Inferred classification, drill hole spacings of approximately 150 m were used for West Branch and 120 m for Piment and Prolongation. An additional small deposit, Fennec, was estimated in 2020 and forms a small portion of the Mineral Resources and Mineral Reserves.

Mineral Resources for the Tasiast Mine, including the West Branch, Piment, Prolongation, and Fennec deposits are presented in Table 1-3.

Page 7
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 1-3: Tasiast Mineral Resource estimateas at December 31, 2024

Deposit Open Pit Underground Stockpiles Combined
Class Tonnes<br>(kt) Grade (g/t Au) Gold Ounces (koz) Tonnes (kt) Grade (g/t Au) Gold Ounces (koz) Tonnes (kt) Grade (g/t Au) Gold Ounces (koz) Tonnes (kt) Grade (g/t Au) Gold Ounces (koz)
West Branch

| Measured | | 1,181 | | 0.75 | | 28 | | | | | | | | 13,339 | | 0.51 | | 220 | | 14,520 | | 0.53 | | 248 | | Indicated | | 43,584 | | 1.09 | | 1,528 | | | | | | | | | | | | | | 43,584 | | 1.09 | | 1,528 | | Meas + Ind | | 44,765 | | 1.08 | | 1,556 | | | | | | | | 13,339 | | 0.51 | | 220 | | 58,104 | | 0.95 | | 1,776 | | Inferred | | 3,462 | | 2.17 | | 242 | | 13,825 | | 2.52 | | 1,119 | | | | | | | | 17,288 | | 2.45 | | 1,360 | | Piment | | | | | | | | | | | | | | | | | | | | | | | | | | Measured | | 4,668 | | 0.77 | | 116 | | | | | | | | 33 | | 0.60 | | 1 | | 4,702 | | 0.77 | | 117 | | Indicated | | 7,423 | | 1.17 | | 280 | | | | | | | | | | | | | | 7,423 | | 1.17 | | 280 | | Meas + Ind | | 12,092 | | 1.02 | | 396 | | | | | | | | 33 | | 0.60 | | 1 | | 12,125 | | 1.02 | | 396 | | Inferred | | 432 | | 1.30 | | 18 | | 2,769 | | 2.57 | | 228 | | | | | | | | 3,202 | | 2.39 | | 247 | | Prolongation | | | | | | | | | | | | | | | | | | | | | | | | | | Measured | | 2,073 | | 1.69 | | 113 | | | | | | | | | | | | | | 2,073 | | 1.69 | | 113 | | Indicated | | 1,136 | | 1.33 | | 48 | | | | | | | | | | | | | | 1,136 | | 1.33 | | 48 | | Meas + Ind | | 3,210 | | 1.56 | | 161 | | | | | | | | | | | | | | 3,210 | | 1.56 | | 161 | | Inferred | | 190 | | 1.16 | | 7 | | | | | | | | | | | | | | 190 | | 1.16 | | 7 | | Fennec | | | | | | | | | | | | | | | | | | | | | | | | | | Measured | | | | | | | | | | | | | | | | | | | | | | | | | | Indicated | | 1,112 | | 0.88 | | 32 | | | | | | | | | | | | | | 1,112 | | 0.88 | | 32 | | Meas + Ind | | 1,112 | | 0.88 | | 32 | | | | | | | | | | | | | | 1,112 | | 0.88 | | 32 | | Inferred | | 367 | | 1.50 | | 18 | | | | | | | | | | | | | | 367 | | 1.50 | | 18 |

Page 8
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
Deposit Open Pit Underground Stockpiles Combined
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Class Tonnes (kt) Grade (g/t Au) Gold Ounces (koz) Tonnes (kt) Grade (g/t Au) Gold Ounces (koz) Tonnes (kt) Grade (g/t Au) Gold Ounces (koz) Tonnes (kt) Grade (g/t Au) Gold Ounces (koz)
Combined Total
Measured 7,923 1.01 257 13,373 0.51 221 21,296 0.70 478
Indicated 53,255 1.10 1,887 53,255 1.10 1,887
Meas + Ind 61,178 1.09 2,144 13,373 0.51 221 74,550 0.99 2,365
Inferred 4,452 1.99 284 16,595 2.53 1,347 21,047 2.41 1,632

Notes:

1. CIM (2014) Definitions were followed for Mineral Resources.
2. Mineral Resources are estimated using a long-term gold price of US$2,000<br> per ounce.
--- ---
3. Open pit Mineral Resources are constrained within an optimized pit shell<br> reported to cut-off grades ranging from 0.39 g/t Au to 0.50 g/t Au.
--- ---
4. Underground Mineral Resources are constrained within resource panels<br> below the optimized pit shell which consider a minimum thickness of 2.5 m and a cut-off grade<br> of 1.8 g/t Au. At West Branch, crown pillar resource panels are factored to represent a 100%<br> extraction limit.
--- ---
5. Bulk density is assigned by oxidation state and lithology.
--- ---
6. Mineral Resources are exclusive of Mineral Reserves.
--- ---
7. Mineral Resources that are not Mineral Reserves do not have demonstrated<br> economic viability.
--- ---
8. Numbers may not add due to rounding.
--- ---
Page 9
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

The QP is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the MRE.

Mineral Reserves

Mineral Reserves were estimated for three areas at the Mine: West Branch, Piment, and Fennec, and are summarized in Table 1-4.

Table 1-4: Summary of Project Mineral Reserves – December 31, 2024

Classification Tonnes (kt) Grade (g/t Au) Gold Ounces (koz)
Proven 14,819 1.34 640
Proven Stockpiles 42,542 0.99 1,361
Subtotal 57,361 1.08 2,000
Probable 45,471 1.85 2,705
TOTAL P&P 102,831 1.42 4,705

Notes:

1. CIM (2014) Definitions were followed for Mineral Reserves.
2. Mineral Reserves are limited to blocks within the reserve pit design<br> and within mineable panels/polygons within which blocks meet an average cut-off grade of<br> 0.6 g/t Au and consider ore loss, dilution, and mining selectivity.
--- ---
3. Mineral Reserves are estimated using an average long-term gold price<br> of US$1,600 per ounce.
--- ---
4. Bulk density is assigned by oxidation state and lithology.
--- ---
5. Numbers may not add due to rounding.
--- ---

The QP is not aware of any mining, metallurgical, infrastructure, permitting, or other relevant factors that could materially affect the Mineral Reserve estimate.

Mining

Ore and waste rock is mined in 10 m benches by conventional open pit methods from the West Branch and Piment pits. Tasiast currently operates a haulage fleet of 45 Caterpillar 793D (220 t), five Hitachi EH-4000 (220 t), and two Komatsu HD785 (92 t). The haulage fleet is primarily loaded by six Caterpillar 6060 shovels and two Bucyrus RH340B excavators, with three Caterpillar 994 front-end loaders utilized for rehandle purposes and four Komatsu PC1250s for auxiliary loading of the smaller Komatsu trucks. Blasting techniques, including presplit and buffer hole blasting, are employed to protect the pit walls. The current mill operates at approximately 24 kt/d. Ore is fed directly from the mine and stockpiles to the primary crusher.

Page 10
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Mineral Processing and Metallurgical Testing

The current configuration of the Tasiast CIL plant has proven capable of processing approximately 24 kt/d. In September 2019, Kinross completed a feasibility study (Tasiast ‘24K’ Project) to incrementally increase throughput capacity at Tasiast from approximately 15 kt/d to 24 kt/d – which included the intermediary step to 21 kt/d (‘21K’ Project) The project (‘24K’ Project) was completed in 2023 with throughput rates increased to 24 kt/d on a daily basis. Additionally, the ‘24K New CIL’ Project was executed in 2024, replacing the previous CIL circuit with new tanks of similar design with the goal of extending their reliability and operation through the LOM. The capital-efficient projects have increased production, lowered costs, and generated significant cash flow and attractive returns.

Environment and Permitting

Current mine operations and the ‘24K’ Project are based on the formal approval of a number of Environmental Impact Assessment (EIA) studies completed before and since mine commissioning in 2007.

A review of waste rock geochemistry to determine the potential for acid rock drainage concluded that the rock has excess neutralizing capacity. Given the excess neutralizing capacity and the very low precipitation at Tasiast, acid rock drainage is not anticipated.

The Tasiast facilities operate under an environmental management system (EMS) that specifies activities to be planned and implemented by the mine’s environmental management team. The EMS incorporates the project design and management, mitigation strategies and performance monitoring commitments outlined in the environmental assessments, applicable legislation, and specific permit requirements.

An element of each EIA prepared for the Tasiast site is a preliminary reclamation and closure plan and associated cost estimate. The preliminary reclamation and closure plan outlines the measures that will be taken to reclaim and close the proposed activities assessed in each EIA. The preliminary reclamation and closure cost estimate forms the basis of the financial assurance. Tasiast, with the support of SRK Consulting (SRK), updated its financial assurance in 2024, including the 24 kt/d ‘24K’ Project . The estimated closure cost is approximately US$64 million. This financial assurance will be submitted to the Mauritanian regulators for their review and approval in February 2025. Once the government of Mauritania validates the assurance, Tasiast will issue a new letter of credit that reflects the remaining amount, taking into account the existing financial assurance of US$6.2 million. At least two years before entering closure, a detailed reclamation and closure plan must be submitted to the appropriate ministries for approval.

Page 11
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Current environmental liabilities are those that would be expected from a mining operation, and include the mine, crushing and CIL processing plant, dump leach facilities, power plant, tailings and waste rock facilities, power grids, roads, accommodation camp, ancillary facilities, and drill pads established to support mining and exploration activities.

Capital and Operating Costs

Capital costs for the Tasiast mine are split into the following categories:

· Non-sustaining<br> capital
o Capitalized Waste Stripping at West Branch<br> pit
--- ---
o Mobile fleet replacement
--- ---
· Sustaining<br> Capital
--- ---
o Capitalized Waste Stripping at Piment pit
--- ---
o Mining Sustaining Capital (incl. fleet replacement)
--- ---
o Mill Sustaining Capital
--- ---
o Tailings Sustaining Capital
--- ---
o Other
--- ---

Total capital for the life-of-mine is estimated at:

· Non-sustaining:
· Sustaining:
--- ---

Operating cost estimates are shown in Table 1-5. The operating costs for each area include allocations for power plant operating costs.

Page 12
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 1-5: Operating cost estimates (January 1,2025)

Operating Cost Unit 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 LOM 2025-2035
Mining US/t mined 3.9 3.9 3.9 3.6 3.5 4.2 0.0 0.0 0.0 0.0 0.0 3.8
Processing (Mill) US/t processed 16.2 15.7 15.9 15.1 15.0 14.7 13.6 13.2 13.4 12.8 12.7 14.4
Site Admin million US/a 112 106 101 98 96 75 41 41 34 30 17 754
Royalties US/oz sold 186 187 188 187 187 187 187 187 187 187 187 187
Other US/oz sold 2.2 2.3 2.3 1.7 1.7 2.2 4.4 4.6 5.0 5.1 2.2 2.6

All values are in US Dollars.

Page 13
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
2. Introduction
--- ---

Kinross Gold Corporation (Kinross) has prepared a Technical Report for the wholly-owned Tasiast Mine (Tasiast or the Complex) located in the Islamic Republic of Mauritania (Mauritania), Africa. The purpose of this Technical Report is to support disclosure of Mineral Resources and Mineral Reserves for the Complex, inclusive of the West Branch, Piment, Prolongation, and Fennec deposits (Mineral Resources) and West Branch, Piment, and Fennec deposits (Mineral Reserves), with an effective date of December 31, 2024. The Technical Report conforms to National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101) and has an effective date of December 31, 2024.

The Tasiast property and the associated Guelb El Ghaîcha exploitation permit are owned by Tasiast Mauritanie Limited S.A. (TMLSA). Société d’Extraction du Nord de l’Inchiri S.A. (SENISA), a sister company of TMLSA, holds two mining permits (for the Tmeimichat and Imkebden areas) that are contiguous with the Tasiast mining permit land (collectively, the Tasiast Lands). As part of the conversion process from exploration to exploitation permit in 2023, Kinross has undertaken to transfer to the Government of Mauritania a 10% carried interest in SENISA. Kinross acquired TMLSA, including the Tasiast Lands, through its acquisition of Red Back Mining Inc (Red Back) in September 2010. There are exploration prospects in all three exploitation permit locations.

The current configuration of the Tasiast carbon-in-leach (CIL) plant has proven capable of processing approximately 24 kt/d. In September 2019, Kinross completed a feasibility study (Tasiast ‘24K’ Project) to incrementally increase throughput capacity at Tasiast from approximately 15 kt/d to 24 kt/d – which included the intermediary step to 21 kt/d (‘21K’ Project) The project (‘24K’ Project) was completed in 2023 with throughput rates increased to 24 kt/d on a daily basis. Additionally, the ‘24K New CIL’ Project was executed in 2024, replacing the previous CIL circuit with new tanks of similar design with the goal of extending their reliability and operation through the life of mine (LOM). The capital-efficient projects have increased production, lowered costs, and generated significant cash flow and attractive returns.

All measurement units used in this Technical Report are metric, and currency is expressed in US dollars unless stated otherwise. Mauritania uses the Ouguiya (MRU) as its currency.

Information used to support this Technical Report has been derived from the reports and documents listed in the References section of this Technical Report.

The use of the terms “we”, “us”, “our”, or “Kinross” in this Technical Report refer to Kinross Gold Corporation.

Page 14
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
2.1 Qualified Persons
--- ---

The Qualified Persons (QP) for this Technical Report are summarized in Table 2-1:

Table 2-1: Qualified Persons and their responsibilities

QP Name,<br> Designation, Title Site Visit Responsible<br> for Sections
Nicos Pfeiffer, P.Geo., VP Geology & Technical<br> Evaluations 25 – 28 Nov 2024 3-6, 20, 23, 24, and relevant portions of 1, 2, 25, 26,<br> 27
Agung Prawasono, P.Eng, Sr. Director, Mine Planning 23 Feb – 2 Mar 2025 15, 16, and relevant portions of 1, 2, 25, 26, 27
Yves Breau, P. Eng, VP Metallurgy & Engineering 4 – 10 Aug 2024 13, 17, 18, 19, relevant portions of 1, 2, 25, 26, 27
Graham Long, P.Geo., VP Exploration 17 – 26 Nov 2024 7, 8, 9 ,10, relevant portions of 1, 2, 25, 26, 27
Jacob Brown, SME (RM), Dir. Resource and Mine Geology -- 11, 12, 14, relevant portions of 1, 2, 25, 26, 27
Kevin van Warmerdam, P.Eng, Sr. Dir. Engineering &<br> Energy 17 – 21 Oct 2024 21, 22, relevant portions of 1, 2, 25, 26, 27

Mr. Pfeiffer visited the site most recently in November 2024. During the site visit, he inspected core and surface outcrops, drill platforms and sample cutting and logging areas; discussed geology and mineralization with project staff; reviewed geological interpretations with staff; and inspected the major infrastructure and current mining operations. There have been no material changes in site conditions since this most recent site visit. All sections in this Technical Report have been prepared under the supervision of Mr. Pfeiffer.

Mineral Resources: The MREs included in this Technical Report were prepared under the supervision Jacob Brown, SME, Kinross Director Resource and Mine Geology, Kinross Technical Services. Mr. Brown is a Professional Member of the Society for Mining, Metallurgy & Exploration.

Mineral Reserves / Mining: The Mineral Reserve estimate and economic analysis included in this Technical Report was prepared under the supervision of Agung Prawasono, Senior Director Mine Planning, Kinross Technical Services. Mr. Prawasono is a Registered Professional Engineer in the Province of Ontario. Mr. Prawasono visited the site most recently in November 2024.

Mineral Processing: Mineral processing aspects of this report were prepared under the supervision of Yves Breau, Vice President, Metallurgy and Engineering, Kinross Technical Services. Mr. Breau is a Registered Professional Engineer in the Province of Ontario. Mr. Breau visited the site most recently in August 2024.

Page 15
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
2.2 Sources of Information
--- ---

Information used to support this Technical Report was derived from previous technical reports on the property, and from the reports and documents listed in Section 27 References of this Technical Report.

2.3 Effective Date

The effective date of this Technical Report is December 31, 2024.

There were no material changes to the information on the Tasiast Mine between the effective date and the signature date of the Technical Report.

Page 16
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
2.4 List of Abbreviations
--- ---

Units of measurement used in this Technical Report conform to the metric system. All currency in this Technical Report is in US dollars (US$) unless otherwise noted.

°C degree<br> Celsius kt thousand tonnes
a annum kt/d thousand tonnes per day
Au gold kPa kilopascal
bbl barrels kWh/t kilowatt-hour per tonne
BV/h bed volumes per<br> hour kW kilowatt
C$ Canadian dollars kWh kilowatt-hour
cm centimetre L litre
cm^2^ square centimetre L/s liters per second
d day m metre
dia. diameter M mega (million)
ft foot m^2^ square metre
ft/s foot per second m^3^ cubic metre
ft^2^ square foot Ma Mega-annum (millions of years before present)
ft^3^ cubic foot min minute
g gram masl metres above sea level
G giga (billion) mm millimetre
g/L gram per liter Mt/a million tonne per year
g/t gram per tonne MW megawatt
Ga Giga-annum (billions<br> of years before present) MWe megawatt-electrical
Ha hectare m^3^/h cubic metres per hour
in. inch oz Troy ounce (31.1035 g)
in^2^ square inch ppm part per million
J joule s second
k thousand (kilo) t metric tonne
kg kilogram t/a metric tonne per year
km kilometre t/d metric tonne per day
km^2^ square kilometre US$ United States dollar
km/h kilometres per<br> hour V volt
koz thousand ounces yr year
Page 17
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
3. Reliance on Other Experts
--- ---

In the preparation of the Technical Report, the QPs relied on information provided by internal Kinross legal counsel for the discussion of claim numbers, title types, anniversary dates, and confirmation that the claims are in good standing as of the date of this Technical Report, as summarized in Section 4.2.

Page 18
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
4. Property Description and Location
--- ---
4.1 Location
--- ---

The Tasiast Lands are located in northwestern Mauritania, approximately 300 km north of the capital Nouakchott and 250 km southeast of the major city of Nouadhibou. The Tasiast Lands fall within the Inchiri and Dakhlet Nouadhibou districts. The Complex is located at 446600E and 2275600N (UTM, WGS84, Zone 28N) and is presented in Figure 4-1 and Figure 4-2.

Page 19
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Source: Kinross 2019.

Figure 4-1: Location map

Page 20
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 4-2: PropertyMap

Page 21
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
4.2 Mineral Tenure
--- ---

Mauritania's mining sector is regulated by the Mining Code 2008 (Law No. 2008 – 011, dated). The regulatory framework for the mining sector also includes Law No. 2009-026 (amendment to Mining Code); Law No. 2012-014 (amendment to Mining Code); and Law No. 2014-008 (amendment to Mining Code). The law is available on the official website of the government regulatory entity (https://mmi.gov.mr/fr/legislations-mines/).

The Tasiast Mine is owned and operated by TMLSA, a wholly owned subsidiary of Kinross, within the 312 km^2^ exploitation permit (permis d’exploitation, or PE) of Ghelb El Ghaîcha (No. 229C2 or “PE No. 229”). The Tasiast Mine and the exploitation permit are owned by TMLSA.

Exploitation permit No. 229C2 is located centrally within a surrounding permit block of two contiguous exploitation permits, totalling 1,597 km^2^, as listed in Table 4-1 and shown in Figure 4-2. All these permits are in good standing.

The adjacent two permits are held by the sister company of TMLSA, namely SENISA. These two mining permits cover the Tmeimichat and Imkebden areas. In July 2022, as part of the December 2014 conversion process of the two exploration permits, SENISA transferred to the Government of Mauritania a 10% carried interest in the shareholding of the company. Other than the 10% carried interest in SENISA held by the Government of Mauritania, all permit-holding affiliates, including TMLSA, are wholly-owned indirect subsidiaries of Kinross. Kinross acquired TMLSA, including the Tasiast operation and exploration permits and lands, through its acquisition Red Back in September 2010.

Tenure coordinates are shown in Table 4-2. A permit boundary is defined by a list of the coordinates of its corners or pillar points. The boundaries are not physically marked on the ground and have not been surveyed, however, extensive surveying has been conducted within both the exploitation permit No. 229C2 and adjoining permits. All the known gold deposits are well inside the boundaries, and the size and shape of the exploitation permit are adequate for the intended exploration, mining, and processing activities.

Page 22
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Table4-1: Mineral tenure summary – Tasiast Property

Name District Type No. Area (km^2^) Granted Expiry
Tasiast <br><br> (Guelb El Ghaîcha) Inchiri Exploitation Permit 229C2 312 January 19, 2004 January 9, 2034
Imkebden Dakhlet Nouadhibou and Inchiri Exploitation Permit 2018C2 539 December 1, 2014 December 1, 2044
Tmeimichat Inchiri Exploitation Permit 2019C2 746 December 1, 2014 December 1, 2044

Table4-2: Permit boundary coordinates

Coordinates
Permit Name Permit Number Point UTM<br> (E) UTM<br> (N)
Guelb El Ghaîcha 229C2 A 441000 2287000
B 454000 2287000
C 454000 2263000
D 441000 2263000
Imkebden 2018C2 A 435000 2311000
B 446000 2311000
C 446000 2287000
D 441000 2287000
E 441000 2263000
F 445000 2263000
G 445000 2258000
H 432000 2258000
I 432000 2285000
J 435000 2285000
Tmeimichat 2019C2 A 446000 2330000
B 460000 2330000
C 460000 2263000
D 454000 2263000
E 454000 2287000
F 446000 2287000
Page 23
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Surface rights are granted along with the three permits, and applicable fees are paid annually, as determined by decree under the Mining Code. Surface rights for the permit are in good standing, and there are no competing mining rights in the area.

Exploration permits (permis de recherche minière, or PRM) grant exclusive exploration rights over a specific block (maximum 500 km^2^, in accordance with Mining Code 2008, amendment enactment date April 29, 2014) and are granted for a three-year period, renewable twice for up to three years at each renewal. Exploitation permits are granted for 30 years and are renewable for periods of 10 years each. A condition of each permit is that the holder is required to hire Mauritanian tradespersons to provide services and to contract with national suppliers and businesses in preference to foreign service providers, where the national suppliers and businesses can offer at least the same terms, quality, and pricing. Table 4-3 summarizes the durations of exploration and mining permits in Mauritania. Operating permits are discussed in Section 20.2.

Current environmental liabilities are those that would be expected from a mining operation, and include the mine, crushing and CIL processing plant, dump leach facilities, power plant, tailings and waste rock facilities, power grids, roads, accommodation camp, ancillary facilities, and drill pads established to support mining and exploration activities.

Page 24
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Table 4-3: Permitdurations under the 1999 Code applicable to Tasiast

LicenceType Duration Renewal Period Numberof Permissible Renewals Rulesand Mechanisms
Exploration<br>Permit 3<br>years 3<br>years Two   After<br>the two renewal periods lapse, the permit expires unless it is converted (in whole or in part) into an exploitation permit. · Surface<br>Area:1,000 km^2^ blocks
· Confers<br>right to explore for resources to any depth within permit area
· Number<br>is limited to 20 exploration permits per holder; a holder must have the technical and financial capability to conduct the work
· Permits<br>taken under a joint venture are not taken into consideration for the calculation of the above limit, if the holder is not the controlling<br>partner or the operator
· Transferable<br>under conditions established by the Decree on Mining Titles
Mining<br>Permit<br> (Exploitation Permit) 30<br>years 10<br>years Several · Necessary<br>for operating a mine
· Within<br>an area initially covered by an exploration permit, for the same commodities, and on the basis of a feasibility study
· Granted<br>only to a legal entity incorporated under Mauritanian law and created by the holder of the exploration permit
· Transferable<br>under conditions established by the Decree on Mining Titles
· Personnel<br>health and safety reports to be lodged with the Ministry every six months, and environmental and activity reports every year
· Land<br>needs to be rehabilitated after mining
Page 25
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report
4.3 Fees, Royalties, Duties, and Taxes
--- ---

Mining activities in Mauritania are mainly governed by the Mining Code and its regulations, and by the Model Mining Convention Law, which provides the legal and tax framework for all mineral exploration and extraction activities. TMLSA is governed by the Mining Code.

The Mining Code establishes conditions and rules governing all phases of mining activity. The Model Mining Convention Law provides that each exploration permit is subject to a mining convention with the State of Mauritania, which outlines the framework of customs, economic, financial, legal, and tax terms and conditions under which the permit holder proceeds with its exploration or mining activities inside the perimeter of its permit. A mining convention is attached to a given permit. Table 4-4 summarizes provisions of the TMLSA Mining Convention relating to fees, royalties, duties, and taxes.

The Mining Code is also complemented by the Decree on Mining Titles, which provides more details on the process governing the grant, renewal, expansion or reduction, division or merger, transfer, termination, suspension, and cancellation of a permit for exploration or exploitation. It also governs the conversion of an exploration permit into an exploitation permit.

The conditions embodied in the Model Mining Convention (Law No. 2002/02, subsequently replaced by Law 2012-012) are designed to stimulate and encourage investment in both exploration and mining. The mining industry is seen as one of the main growth industries for the improvement of the country’s economy.

In addition to the royalty payable to the government, Franco-Nevada Corporation (Franco-Nevada) holds a 2% net smelter return (NSR) royalty on gold production at the Tasiast mine in excess of 600,000 cumulative ounces produced. Production at the Tasiast mine reached 600,000 ounces in July 2011, and the first royalty payment to Franco-Nevada was made in October 2011. This 2% royalty will also apply to any eventual production from SENISA from its first ounce produced.

On July 15, 2021, TMLSA signed an agreement with the Government of Mauritania, which, among other things, solidified the additional sliding scale royalty, which the Company has been paying since June 15, 2020, that ranges from 1% (at a gold price less than $1,000 per ounce) up to 3.5% (at a gold price of $1,800 per ounce or more). This amount is in addition to the 3% royalty payable under the Mining Convention.

Page 26
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Table 4-4: Applicablefees, royalties, duties and taxes

Applicable Obligation Exploration Permit Mining Permit
Compensatory<br> fees (for the issuance,<br><br> <br>extension or reduction, renewal,<br> early termination and transfer of a permit) MRU<br> 200,000 MRU<br> 250,000
Annual<br> surface fee Initial<br> period:<br><br> <br>MRU 200/km^2^-600/km^2^<br><br> <br>First renewal<br> period: MRU 1,000/km^2^-1,400/km^2^<br><br> <br>Second renewal<br> period: MRU 2,000/km^2^-2,400/km^2^ MRU<br> 5,000/km^2^
Royalty<br> (payable to the Government) 3%<br> gross + additional sliding scale royalty (based upon the sale price per ounce)<br><br> <br>Less than 1,000<br> USD = 1%<br><br> <br>1,000 to 1,199<br> USD = 1.5%<br><br> <br>1,200 to 1,399<br> USD = 2%<br><br> <br>1,400 to 1,599<br> USD = 2.5%<br><br> <br>1,600 to 1,799<br> USD = 3%<br><br> <br>1,800+ USD<br> = 3.5%
Customs<br> duties and other taxes Complete<br> exemption on all imported equipment and supplies, for five years after the start of production (ended August 2012). Customs<br> duties of 5% thereafter on equipment and supplies imported. Exemption on imported fuel is applicable for the duration of the Mining<br> Convention.
Tax<br> on business profits TMLSA<br> was exempt from this tax for the first three years after its first production. After three years, the rate was fixed and stabilized<br> at 25%. Articles 8 to 17 inclusively of the Mining Convention establish the relevant deductions to determine taxable profits.
Fixed<br> minimum tax Exemption<br> until the end of the third year following the year the exploitation permit was granted. Since the end of this period, the standard<br> rate of 2.5% applies at a reduced rate (1.25%) for TMLSA.
Tax<br> on salaries, wages and annuities of<br><br> <br>expatriates employed by TMLSA The<br> standard rate of 40% reduced to half (20%) for TMLSA.
Page 27
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report
Applicable Obligation Exploration Permit Mining Permit
--- --- ---
Income<br> tax from capital Customary<br> applicable rate is 10%. Dividends reinvested on Mauritanian territory are exempt from this tax.
General<br> income tax Exemption<br> for the duration of the Mining Convention
Value-added<br> tax (VAT) Customary<br> applicable rate was increased from 14% to 16% in January 2015, except for exports by TMLSA, which is 0% (contingent on export<br> of at least 80% of production).
Tax<br> on sales - consumption tax Exemption<br> for the duration of the Mining Convention
Housing<br> tax Applies<br> according to the CGI (General Tax Code), as from the first exploitation permit
Land<br> income tax (on properties built) Rules of<br> application are those of the CGI. The rate, as voted by the town council, is 3% to 10% of the taxable value, which is the rental<br> value of the property minus 20%.
Trading<br> tax Applicable<br> from the date the first exploitation permit was granted according to the CGI. This tax is a fixed duty based on turnover
Registration<br> and stamp duties Exemption<br> for the duration of the Mining Convention
Tax<br> on motor vehicles Applies<br> according to the CGI as from the first exploitation permit. The rate of the tax is based on the use of the vehicle and its tax power
Apprenticeship<br> tax Exemption<br> for the duration of the Mining Convention

The QP is not aware of any environmental liabilities on the property. TMLSA and Kinross have all required permits to conduct the proposed work on the property. The QP is not aware of any other significant factors and risks that may affect access, title, or the right or ability to perform the proposed work program on the property

Page 28
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report
5. Accessibility, Climate, Local Resources, Infrastructure and Physiography
--- ---
5.1 Accessibility
--- ---

The Tasiast Lands are accessed from Nouakchott by using the paved Nouakchott to Nouadhibou highway for 370 km and then via 66 km of graded mine access road which is maintained by TMLSA. An airstrip at the Complex is used for light aircraft, primarily travelling to and from Nouakchott.

The principal ports of entry for goods and consumables are either Nouakchott or Nouadhibou. Materials are transported by road to the Complex site.

Access to the major urban centres of Mauritania is also possible via air. Nouakchott is accessible via international flights operated by numerous West and North African carriers; Air France also provides a direct connection to Paris.

5.2 Climate

Mauritania has an arid desert climate, with an average annual high temperature of above 45°C between May and August. Low temperatures may drop below 10°C in December and January. From January to March, sandstorms frequently occur in the country causing sand build up and dune formation. Sandstorms vary in intensity, and visibility can be reduced to several metres.

Average annual precipitation at Tasiast is approximately 90 mm and usually occurs from July to September. The average recorded monthly evaporation is approximately 320 mm/month (3,840 mm/a).

Mauritania is located along the northwestern coast of Africa and is bordered by the Atlantic Ocean to the west. The country’s land mass covers the western portion of the Sahara Desert. Mauritania’s land mass consists mainly of flat and barren desert landscape surfaces that are crosscut by three large northeast-southwest trending longitudinal dune fields. In the desert regions, vegetation is sparse, consisting of various species of trees (e.g., acacia) and grasses.

5.3 Local Resources and Infrastructure

The Complex is located in a remote area where there is no electric power grid. On-site power generation is discussed in Section 18.

Page 29
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

The source of mine water supply is located 64 km west of the Complex and consists of a semi-saline underground aquifer, with wells for water production. Water is pumped from the bore field to the Mine (see Section 18).

In 2024, the Tasiast Complex had approximately 1,726 employees, of whom approximately 1,680 are Mauritanian nationals. Staff accommodation is provided at the Complex (see Section 18).

The terrain surrounding the Complex is flat and is adequate for construction and operation of the camp, mine, plant, tailings, and waste rock disposal facilities.

5.4 Physiography and Environment

The topography of the Tasiast Lands consists mainly of flat, barren plains which are primarily covered by regolith and locally by sand dunes or eroded paleo-lateritic profiles. Elevation ranges from approximately 130 masl to 150 masl.

The drainage pattern around the Tasiast Lands consists of several intermittent dendritic first- and second-order streams that generally flow in a southwesterly direction. There are no permanent watercourses in the area. However, there are numerous, intermittent watercourses, known as “wadis”, which flow for only a few days per year. The largest wadi is the Khatt Ataoui wadi, which is located approximately six kilometres from the mine site.

The Complex is located in the arid Saharan zone, where plant life is very scarce, consisting mainly of the low shrubs Zygophyllum album, the small tree Maerua crassifolia (atil) and the grass Aristida pungens (sbot). Acacias are also present along many of the wadis.

Hares, hamsters, and gerbils are the most common mammals at the mine site, and jackals, fennec fox, and polecat can also be found in the area. There are no protected species in the Tasiast area. The eastern boundary of the Banc D’Arguin National Park is located approximately two kilometres west of the bore field area and approximately 60 km from the mine site.

Page 30
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report
6. History
--- ---
6.1 Tenure History
--- ---

In 1996, the Office Mauritanien de Recherches Géologiques (OMRG) completed a regional reconnaissance exploration program within and around the lands hosting the Tasiast deposit and made the results available to third parties. As a result, Normandy LaSource Development Ltd. (NLSD), a subsidiary of Normandy Mining Ltd. of Australia, acquired the exploration rights to the Tasiast deposit.

In 2001, NLSD was acquired by Newmont Mining Corporation, creating Newmont LaSource. Midas Gold PLC (Midas) was incorporated in England and Wales in 2002 for the purpose of acquiring Newmont LaSource’s assets in Mauritania, including exploration permits over lands hosting the Tasiast deposit, as well as other permit areas. Midas completed its acquisition of the Tasiast deposit from Newmont LaSource on April 1, 2003, and, in April 2003, Geomaque Explorations Inc. (Geomaque) announced the acquisition of Midas. The merger of Geomaque and Midas ultimately created a new entity - Defiance Mining Corporation (Defiance). In June 2004, Rio Narcea Gold Mines, Ltd. (Rio Narcea) acquired Defiance and took ownership of the Tasiast deposit.

Red Back acquired the Tasiast deposit from Lundin Mining Corporation (Lundin) in August 2007 following Lundin’s acquisition of Rio Narcea. In September 2010, Kinross completed the acquisition of Red Back. Kinross, through TMLSA, holds 100% of the Project.

6.2 Project History

From 1962 to 1993, the Tasiast region was the subject of three regional exploration programs for pegmatites, iron ore, and nickel sulphides which were carried out by the Bureau de Recherches Géologiques et Minières (BRGM) and Societe Nationale Industrielle et Minière (SNIM).

Three exploration programs were carried out in the Tasiast region between 1993 and 1996 as a European Development Fund project. Work completed included regional-scale reconnaissance geological mapping and geochemical sampling. Traverse lines for the mapping and geochemical sampling programs were oriented east-west with samples collected at 500 m centres. This work identified the Tasiast area as being anomalous in gold and was followed by more detailed soil sampling on 250 m spaced centres, and trenching.

NLSD, in the period from 1996 to 2001, completed geological and regolith mapping, interpretation of satellite imagery, airborne and ground magnetic geophysical surveys, specialist petrographical, mineralogical, and geological studies, metallurgical test work, and auger, reverse circulation (RC), and core drilling.

Page 31
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Midas undertook a full review of all existing information in 2003, and prepared MREs for the West Branch and Piment areas. From 2003 to 2004, Defiance completed mineralogical and metallurgical test work, hydrogeological studies, a preliminary pit slope design study, RC and core drilling, a MRE, and a feasibility study.

Rio Narcea completed additional RC and core drilling from 2005 to 2006. Red Back also undertook RC and core drilling, re-estimated mineral resources, and updated engineering studies.

Between August 2007 and September 2010, Red Back completed several large exploration campaigns in the Piment and West Branch areas, as well as at several district targets. Early drilling campaigns were directed at testing the lateral and vertical extents of the mineralization at Piment and drilling oxide resources at West Branch. In October 2009, Red Back discovered the Greenschist Zone at West Branch and commenced drilling the deposit.

From September 2010 to date, TMLSA has ramped up exploration with the majority of activities directed towards delineating the extents of the Greenschist Zone.

Mining at Tasiast commenced in April 2007 and the mine was officially opened by the President of Mauritania, His Excellency Sidi Mohamed Ould Cheikh Abdallahi, on July 18, 2007. A summary of gold production at Tasiast is included in Table 6-1 There has been no historical gold production from other deposits in the Tasiast area.

Page 32
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Table6-1: Production summary

Carbon-In-Leach **** Dump Leach Total
**** Tonnes Milled Grade Gold Produced Recovery **** Gold Produced Gold Produced
Year (Mt) (g/t) (koz) (%) **** (koz) (koz)
2007 0.22 4.36 21 68.6 % 0 21
2008 1.49 3.07 140 95.4 % 0 140
2009 1.68 2.88 142 91.4 % 16 159
2010 2.14 2.52 150 86.8 % 36 186
2011 2.60 2.04 153 89.4 % 48 201
2012 2.55 1.54 114 90.2 % 71 185
2013 2.50 1.96 144 91.3 % 104 248
2014 2.56 2.16 161 93.1 % 94 255
2015 2.54 2.17 160 90.1 % 60 220
2016 2.46 1.81 131 90.6 % 45 176
2017 3.04 2.36 214 92.3 % 30 244
2018 3.73 2.02 225 92.6 % 30 255
2019 5.23 2.33 379 96.6 % 0 379
2020 5.35 2.49 404 94.4 % 0 404
2021 3.73 1.69 193 94.9 % 0 193
2022 6.57 2.75 526 90.5 % 0 526
2023 6.72 3.19 636 92.3 % 0 636
2024 8.64 2.44 623 92.1 % 0 623
Total/Average 63.72 2.39 4,513 92.0 % 554 5,066
Page 33
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report
7. Geological Setting
--- ---
7.1 Regional Geology
--- ---

The Tasiast district is situated in the southwestern corner of the Reguibat Shield, which is a northeast-trending crustal block of the West African Craton (Figure 7-1). The Reguibat Shield contains the oldest rocks in Mauritania and consists of two major subdivisions separated by a crustal-scale shear zone representing a major accretionary boundary (Lahondère et al. 2003; Pitfield et al. 2004; Schofield et al. 2006). The southwestern part (which hosts the Tasiast deposits) consists of Mesoarchean to Paleoproterozoic rocks that include high-grade granite-gneiss and greenstone belt assemblages. The northeastern part of the shield consists of younger Paleoproterozoic to Neoproterozoic successions, which host many orogenic gold occurrences in the West African Craton. This region is characterized by a series of volcano-sedimentary belts and associated batholithic-scale granitic intrusive suites of different ages cut by major shear zones.

The Reguibat Shield is bound on all sides by Pan African orogenic belts and covered in the south by the extensive intra-cratonic sediments of the Taoudeni Basin. The Taoudeni Basin represents one of the largest Mesoproterozoic to Paleozoic cratonic sedimentary basins in Africa. It consists of many thousands of metres of continental sandstones, platform carbonate rocks, and lesser shales.

Page 34
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Modified from Fabre (2005)

Figure7-1: Geology of the West African Craton

Page 35
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report
7.2 District Geology
--- ---

The district scale geology is characterized by basement rocks, largely composed of orthogneiss, overlain by deformed north-striking metavolcanic and metasedimentary successions intruded by stocks and plutons of mafic to intermediate composition (granite-greenstone belts). All the rock units are cut by unfoliated and post-mineral mafic (gabbroic) dykes. Two significant Archaean greenstone belts are exposed within the Tasiast District (Figure 7-2):

· Aouéouat<br> (+75 km long x 8 km wide); and
· Imkebden-Kneiffissat<br> (+60 km long x 9 km wide).
--- ---

The greenstone belts are wholly enclosed by granitic to gabbroic intrusive rocks and gneissic domes that comprise the bulk of the rocks within the district and the Reguibat Shield overall. The greenstone belts comprise ultramafic to felsic volcanic and volcano-sedimentary packages with variably preserved ferruginous quartzite, locally termed banded magnetite. Rock units within the belts have undergone mid greenschist to lower amphibolite facies metamorphism and multiple deformation events. Swarms of non-foliated mafic (basaltic) dykes striking north-northeast/south-southwest and roughly east-west crosscut all other rocks in the district, including undeformed pegmatite units.

A Precambrian lithostratigraphy was established by Kinross for the Aouéouat belt (Figure 7-3) including several U-Pb dates for rocks of the Aouéouat and Tasiast assemblages and for granodiorite intrusions. The mafic to felsic volcanic and intrusive units that host the West Branch deposit belong to the Aouéouat assemblage that crystallized between 2,990 Ma and 3,000 Ma. Metasedimentary rocks of the Tasiast assemblage that overlay the mineralized West Branch units contain detrital zircons of similar ages and older populations derived from approximate 3,200 Ma orthogneiss basement. Granodiorites that crosscut the metavolcanic rocks are dated 2,960 Ma to 2,970 Ma. An age of 2,839 ±36 Ma obtained from the hydrothermal overgrowth on zircons from a quartz vein at the Fennec deposit is interpreted to represent the age of mineralization at Tasiast (Heron et al., 2016).

The principal north-south structural fabric in the Tasiast granite-greenstone belts is evident in satellite images (Worldview-2), airborne geophysics, and regional geological maps. Steeply dipping foliations and isoclinals folds with north-south to northwest- southeast axial surface traces are common across the Aouéouat belt. Those structures formed through east-west transpressive shortening that occurred as a result of basin inversion. Strain was partitioned between tightly folded domains and north-south striking shear zones. Several families of late-stage crosscutting faults with northeast and southwest strikes are occupied by fresh mafic dyke material.

All the significant mineralized bodies defined to date dip moderately to steeply (45° to 70°) to the east and have a south–southeasterly plunge. Gold deposits on the Tasiast trend are associated with second order shear zones and splays cutting the hanging wall block of an inferred thrust. The volcano-sedimentary stratigraphy has been tightly to isoclinally folded and is cut longitudinally by sub-parallel shears that are sub-parallel to the predominant foliation.

The main Tasiast gold trend includes the West Branch and Piment-Prolongation deposits. Gold mineralization is spatially associated with the west vergent Tasiast shear system that places mafic to felsic volcanic and intrusive rocks of the Aouéouat assemblage, including the host rocks of the West Branch deposit, on top of the younger metasedimentary rocks of the Tasiast assemblage. The Tasiast trend passes north-south through the Guelb El Ghaîcha mining permit and extends to the north and south onto adjacent licences.

Page 36
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Figure 7-2: TasiastDistrict tectonic map - Granite-Greenstone Belts

Page 37
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Figure7-3: Precambrian stratigraphy of the Aouéouat Greenstone Belt

7.3 Deposit Geology

The Tasiast Mine consists of two deposit sets hosted within distinctly different rock types, both situated within the hanging wall of the west-vergent Tasiast thrust (Figure 7-4 and Figure 7-5).

The Piment deposits (Piment and Prolongation) are hosted within metasedimentary rocks including metaturbidites and banded iron formation where the main mineral association consists of magnetite - quartz pyrrhotite ± actinolite ± garnet ± biotite. Gold is associated with silica flooding and sulphide replacement of magnetite in the turbidites and in the banded iron formation units.

Page 38
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

The West Branch deposit geological succession comprises mafic to felsic volcanic sequences, iron- rich formations and clastic units that have undergone mid greenschist to lower amphibolite facies metamorphism and multiple deformation events.

The main units recognized at West Branch are:

· GDI – A diorite to quartz diorite intrusion(s) of the Aouéouat Assemblage.<br> Historically, the GDI was referred to as the Greenschist Zone (GST).
· FVC – Felsite of the Aouéouat Assemblage.
--- ---
· SVC and BIM – Siliciclastic metasedimentary rocks of the Tasiast Assemblage.
--- ---
· MDO – Mafic dykes, post schistosity and post mineralization
--- ---

Notes:

1. Biotite rich, 2% to 5% sulphides (pyrrhotite>>pyrite) intense<br> quartz- carbonate veining (5% to 10%) folded and boudinaged => biotite schist (BST) zone
2. Actinolite+ garnet >biotite => GST 1 zone
3. biotite rich => BST

Figure 7-4: Mainlithologies identified in the West Branch area

Most of the gold mineralization at West Branch is hosted by quartz–carbonate veins within the sheared and hydrothermally altered meta-diorites that constitute the Greenschist Zone. All the significant mineralized bodies defined to date dip moderately to steeply (45° to 70°) to the east and have a south–southeasterly plunge (Figure 7-6 and Figure 7-7).

Page 39
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Figure 7-5: Nearmine geology model (looking down at 4,950 m elev)

Page 40
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Diorites and Basalts ofthe Aouéouat Assemblage

The majority of the economic mineralization at West Branch is hosted by a diorite to quartz diorite intrusion (termed the GDI) which has intruded into FVC or felsite (clastic sediments). The GDI is light to medium grey, medium- to fine-grained, and composed of plagioclase, quartz, and biotite with some potassium feldspar (up to half of the plagioclase content). It typically shows a zonation from a barren garnet-amphibole assemblage at its margins to an auriferous quartz-biotite-ankerite-pyrite-pyrrhotite assemblage and back into the barren garnet-amphibole assemblage. This unit is also characterized by a distinctive penetrative foliation that is most strongly expressed by the alignment of biotite crystals. It was previously referred to as plagioclase-biotite schist and was logged as schist (SHT) and biotite schist (BST). At West Branch, the GDI consistently averages 50 m to 100 m in thickness over a strike length that exceeds two kilometres.

Felsite of the AouéouatAssemblage

The FVC unit is a clastic sedimentary sequence of predominantly quartzite with minor locally polymict felsic conglomerate layers. Previously, this unit had been interpreted to be of volcanic origin and hence its confusing name (FVC = Felsic Volcanic). At West Branch, the FVC unit is present both structurally above and below the GDI. The unit is intensely sheared and preserves a well-developed phyllosilicate foliation. Commonly this unit is albitized and is called ‘felsite’, which is not a rock type. Within the FVC, near to its contacts with other units, a cream coloured rock locally occurs that hosts fuchsitic (chromium rich) mica.

Siliciclastic MetasedimentaryRocks of the Tasiast Assemblage

The rocks on the eastern and western sides of the Project area are primarily sediments. Most of these units are greywacke, siltstone, arenite, and iron formation (locally termed BIM or banded-iron-magnetite).

Greywacke, Siltstone &Conglomerate

The SVC or SGW (volcaniclastic – clastic sedimentary rock) is mainly a greywacke- turbiditic clastic sedimentary unit. The beds are typically 1-10 cm thick, well sorted and often graded. The logging code ‘SVC’ has been inherited from early days of exploration when the rocks were interpreted to be volcaniclastic sediments.

Banded Iron and Magnetite

The banded iron mineralization (BIM) is composed of alternating layers of dark greenish magnetite-grunerite and light gray quartzofeldspathic compositions, typical of Algoma style iron formation. The aluminum component is detrital and has a composition-mixing trend to the clastic sedimentary rocks (SVC, SGW). The iron formation units can vary from centimetre to decimetre scale in thickness, with millimetre to centimetre beds common. Although the units are locally tightly folded, attenuated, or boundinaged, individual units can in some cases be traced for hundreds to thousands of metres along strike. Three BIM units have been logged and mapped in the West Branch project area; two in the hanging wall, and one in the footwall of the Tasiast thrust system. The hanging wall BIM units are generally unmineralized and the footwall BIM is variably mineralized (dependent upon proximity to structure). The contact between the hanging wall BIM and the FVC units is locally defined by the presence of a discontinuous conglomerate that contains abundant clasts derived from the FVC unit and a subordinate proportion of clasts derived from mafic metavolcanic units.

Mafic Dykes

Mafic dykes that are post schistosity and post mineralization are dark olive green, fine to medium-grained and are locally plagioclase phyric. Dykes are typically less than five metres wide, weakly magnetic and have locally developed hornfels and brecciated margins with a carbonate-chlorite assemblage. The dykes are dominantly barren and crosscut mineralized units.

Page 41
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Figure 7-6: Lithologylevel plan at West Branch – looking down at 4,900 m elev

Figure 7-7: Lithologycross section at West Branch – looking north at 71,500 N

Page 42
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report
7.4 Structural Geology
--- ---

The Tasiast deposits are hosted within a package of strongly foliated and folded rocks in the hanging wall block of an assumed thrust fault or thrust fault system referred to as the Tasiast thrust system (Figure 7-8). Modelling and interpretation of high-resolution gravity data (Figure 9-1) shows deep geometry suggestive of a thrust system underlying the Aouéouat belt. The Tasiast thrust system displays zones of strong deformation typically 0.5 m to 10 m wide and characterized by laminated foliation with locally preserved mylonitic textures. Hydrothermal alteration assemblages, sulphides, and quartz veins are commonly spatially associated with the zones of intense deformation.

All the Tasiast deposits host an intense, generally north-south striking, variably dipping, penetrative foliation, S1, which is axial planar to tight isoclinal folds in the host sequence (Davis 2018). The foliation fabric within the main mine sequence, at West Branch, dips moderately to the East at 40° to 50°, steepens to the north to 55° to 65° at Piment, and becomes sub-vertical, at the north end of the mine sequence, near Prolongation.

Pit mapping at Tasiast includes the collection of structural fabric measurements for structural geology and geotechnical application. Numerous consultants have assisted Kinross in developing a structural model for the Tasiast deposits along with developing pit mapping procedures. Most recently, in 2018, Dominique Chardon worked with the Mine Geology department to review and analyze the significant database of structural data collected from pit mapping activities. A synthesis of this review is presented in Figure 7-9 as detailed pit-scale maps.

Quartz-carbonate vein sets occur sub-parallel and oblique to foliation and range in style from boudinaged, buckled, folded to planar. The veins clearly formed in extensional and/or Riedel shear orientations and were progressively folded, rotated, locally boudinaged, and partially or wholly transposed parallel to the foliation. In the core of the West Branch Greenschist Zone vein, densities are typically higher in the meta-intrusive dioritic unit (averaging between 2% to 5%) than in the meta-basalt (<2%). This higher density suggests the coarser-grained feldspar-rich dioritic facies focused stresses and readily developed brittle-ductile shears, as expected for quartzofeldspathic rocks under retrograde Greenschist metamorphic conditions. Along the margins of the West Branch deposit, both the dioritic and meta-mafic volcanic units have a low vein density (<1%). Quartz-carbonate veins also developed locally within FVC that envelops the Greenschist Zone and within the footwall meta-sedimentary units.

Page 43
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Figure 7-8: Localscale shear framework and form surface map

Page 44
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

a. Fabric<br> measurements (in red and blue) and fabric trajectories (in black) at Piment
b. Fabric<br> trajectories and interpretative shear zone pattern (in red) at Piment
--- ---
c. Fabric<br> measurements (in red and blue) and fabric trajectories (in black) at West Branch and Turek
--- ---
d. Fabric trajectories<br> and interpretative shear zone pattern (in red) at West Branch and Turek
--- ---

Figure 7-9: Structuralmaps of the northern pits (Piment; a, b) and southern pits (West Branch, Turek; c, d)

Page 45
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report
7.5 Mineralization and Alteration
--- ---

All the rocks in the property area have undergone lower amphibolite facies metamorphism. Given the metamorphic grade, it is challenging to identify the rocks’ alteration as it has been largely, if not totally, overprinted by the metamorphism. A description of the commonly observed types of alteration are presented in Table 7-1.

Table 7-1: WestBranch alteration codes and descriptions

Code Meaning Occurrence
ALB Albite-Biotite<br> Albite > Biotite SVC unit.
BIO Biotite rich SVC<br> unit in both FW and HW and<br> in the upper lens of the GDI
BST Biotite<br> >>> Actinolite,<br> pyrrhotite»<br> pyrite,<br> <br>Quartz<br> veins rich but garnet<br> is absent GDI<br> and is a good proxy for the 2 git Au grade shell
GST1 Actinolite-Garnet<br> > Biotite GDI,<br> outer envelope around the<br> mineralization.
GST2 Biotite-Garnet<br> > Biotite Transitional<br> unit between GST 1 and BST
GST3 Like<br> GST1 with abundant magnetite<br> (very magnetic) Typically<br> found in BIM

The bulk of the mineralization at the West Branch deposit is hosted within the GDI. The GDI typically shows a zonation from a barren garnet-amphibole assemblage at its margins to an auriferous quartz-biotite-ankerite-pyrite-pyrrhotite assemblage and back into the barren garnet-amphibole assemblage. This zonation likely reflects a metamorphosed alteration assemblage with the garnet-amphibole assemblage representing a chlorite alteration precursor and the biotite-quartz-sulfides representing a quartz-sericite precursor.

Gold mineralization is also present in the other main units (FVC, SVC & BIM) (see Figure 7-10).

In the FVC, two different styles of mineralization are observed:

· High-grade<br> quartz veins (approximately 5 g/t to 10 g/t) stockwork directly above the “apex”<br> of the GDI. This is often referred to as Pluto style mineralization. The veins are highly<br> deformed, in particular folded. The strike and down dip continuity is limited to a few hundreds<br> of metres.
Page 46
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report
· Lower<br> grade quartz veins (averaging approximately one gram per tonne) stockwork preferentially<br> in the hanging wall and central part. The footwall is usually barren.
--- ---

In the SVC unit, gold is associated with quartz veins and garnet - actinolite metamorphosed assemblage. In the BIM unit, gold is associated with sulphidic replacement of the magnetite by pyrrhotite. Locally quartz veining is also developed.

Notes:

a. Isoclinally<br> folded sediments that are representative of the host rocks for all the Piment deposits, Tasiast<br> Mine, pen for scale.
b. Strongly<br> foliated meta-diorite from West Branch typical of the Greenschist Zone.
--- ---
c. Silica<br> flooding and extensive sulphide mineralization, mainly pyrrhotite, parallel to bedding in<br> the metaturbidites at Piment.
--- ---
d. Visible gold hosted<br> in a quartz–carbonate vein, in drill core taken from the West Branch deposit.
--- ---

Figure 7-10:Photographs illustrating mineralization styles

Page 47
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Ore control and pit mapping identified a high-grade quartz-carbonate-chlorite- tourmaline-gold vein which is coincident with an interpreted Tasiast splay (locally termed the central fault). The vein has been mapped over several benches striking 330° to 340° and dipping at approximately 55° to 60°to the east (Figure 7-11 and Figure 7-12).

Quartz-carbonate vein sets occur sub-parallel and oblique to foliation and range in style from boudinaged, buckled, folded to planar. The veins formed in extensional and/or Riedel shear orientations and were progressively folded, rotated, locally boudinaged, and partially or wholly transposed parallel to the foliation. Density of veining is typically higher in the GDI (averaging between 2% to 5%) than in the meta-basalt (<2%). Quartz-carbonate veins also observed locally within FVC that envelops the GDI and within the footwall meta- sedimentary units.

Note: Multiple vein sets are observed (Riedel, Riedel’/extensional).

Figure 7-11:West Branch 4980 m bench high-grade vein

Page 48
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Note: Vein is completely boudinaged at extremities to the north and south**.**

Figure 7-12:West Branch 4980 m bench showing mapped GDI (orange) and high-grade vein (black)

Page 49
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Gold occurs as both microscopic grains and coarse visible gold. When observed in hand specimen, grains are commonly spatially associated with hairline fractures in quartz veins and margins of sulphide minerals. The majority of the quartz veins containing coarse visible gold cut the foliation at a slightly oblique angle and mainly dip gently to the east. Most gold grains occur along the margin of the gangue and ore minerals, with 98% of the calculated volume/mass of the grains occurring in liberated and partially liberated forms. By volume/mass calculations, the majority (greater than 70%) of the volume is associated with the coarser (plus 75 μm) size fraction. Encapsulated gold grains are rarely observed. When present they are predominantly a very fine grain size. Semi-quantitative scanning electron microscopy analysis of gold grains indicated low silver (less than 15%) and trace iron (less than 3%) content.

Page 50
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
8. Deposit Types
--- ---

Tasiast gold deposits are hosted in Archaean volcanic-sedimentary sequences that have been deformed and metamorphosed to lower amphibolite peak metamorphic grade. Mineralization is both structurally and lithologically controlled, epigenetic in style and was coincident with early stages of post-peak metamorphic retrograde Greenschist P-T conditions.

The Tasiast gold deposits fall into the broad category of orogenic gold deposits. The regional geological setting and deposit features at Tasiast are similar to other well- known Archaean lode gold deposits hosted along greenstone belts in granitoid- greenstone terranes.

Examples of analogue terranes of similar ages to the Aouéouat belt include the Kaapvaal craton in South Africa, the Pilbara craton in Australia and the Wyoming craton in the USA. The Aouéouat belt also shares many similarities with gold-rich Archaean terranes, such as the Yilgarn in Australia and the Abitibi in Canada.

Page 51
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
9. Exploration
--- ---

Exploration activities have been undertaken by TMLSA, its precursor companies, consultants, and contractors.

9.1 Grids and Surveys

The coordinate system used on site is a mine grid, a truncated UTM Zone 28 North grid system; the UTM Easting is shifted by -400,000 m and UTM Northing is shifted by - 2,200,000 m. The Original Control has been set out by IPH Engineering and 10 control points are set out across the Complex. Surveyors use a differential global positioning system (GPS) for surveying at the Complex (Trimble DGPS TSC3, Scanner MAPTEK I-Site 8820, and Trimble Drone UX5HP).

9.2 Geological and Regolith Mapping

Numerous phases of geological and regolith mapping have been undertaken during the life of the project and range from regional (1:100,000) to prospect (1:1,000) scale. Work was completed by the BRGM, SNIM, NLSD, Defiance, Red Back, and Kinross. Mapping was facilitated by good outcrop, RC and diamond drilling (DD), high resolution satellite imagery, and detailed airborne geophysical data. Results were used to identify areas of alteration, structural complexity, quartz-carbonate veining, and sulphide outcrop that warranted additional work.

9.3 Geochemistry Sampling

A total of 22,294 surface samples have been collected by Kinross since it started operations, including soil samples (40%) and rock samples (60%) that cover a surface area of approximately 1,000 km^2^. In addition, 299 auger drill samples were collected during 2016. Soil samples were collected by a contractor and supervised by Kinross staff. The sample grid was generally west-east with lines spacing at 800 m and sample spacing at 200 m. The geochemical sampling includes exposed geology as well as areas covered by sand, in which the bedrock was sampled with auger drilling. Accordingly, the geochemical dataset has the potential to identify areas of prospective mineralization otherwise blind from surface mapping. Surface exploration geochemistry samples were analyzed for gold and multi-element geochemistry.

Page 52
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
9.4 Geophysics
--- ---

Airborne magnetic-radiometric surveys were completed by NLSD (2000-2001) and Red Back (2007). These surveys were mainly used to map out lithological formations and major structures. In 2008-2009, Red Back completed a helicopter-borne versatile time domain electromagnetic (VTEM) survey. In 2011, Kinross completed airborne magnetic and radiometric surveys over the complete licence package. This survey overlapped the previous survey and generated a higher resolution version. In 2013, Kinross completed ground based gravimetric and induced polarization (PDIP/IP) surveys. The gravity survey covered the complete licence package (Figure 9-1) while the IP surveys covered only specific prospect areas; South West Branch South, Fennec, C67, C68, and Morris. In 2014, a comprehensive review was completed by a consulting geophysicist, along with some reprocessing of the magnetic data. In December 2023, a 3D IP survey was completed by geoscience consulting firm Quantec Geoscience Ltd under contract with Kinross to help define the nature and setting of gold mineralization on the SENISA exploitation permits, and to gain a better understanding of the complex structural geology controls around spatial distribution and gold ore genesis. The survey covered target areas at GRD, C23, KNF, and Morris (N1-N2), as shown in Figure 9-2. Results of the IP chargeability for the different areas are shown in Figure 9-3 to Figure 9-6.

Page 53
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure9-1: Depth slice (880 m) of the Bouguer gravity 1VD

Page 54
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 9-2: Senisatarget area of IP surveys


Page 55
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 9-3: Depthslice (100 m) of IP chargeability at C23


Page 56
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 9-4: Depthslice (200 m) of IP chargeability at GRD


Page 57
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 9-5: DepthSlice (200 m) of IP chargeability at KHN


Page 58
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 9-6: Depthslice (250 m) of IP chargeability at Morris


Page 59
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

9.5 Pits and Trenches

Excavation of trenches as an exploration technique has been very successful at Tasiast. In total, 485 trenches for 111,068 m have been completed across the Tasiast lands. Historically, trenches were completed manually, and since the 2000s, trenches are completed using an excavator. The standard excavated trench dimension is approximately two metres wide and not more than 1.5 m deep and typically sampled every two metres along the full length of the trench.

9.6 Petrology, Mineralogy, and Other Research Studies

Numerous petrographic and gold deportment studies have been completed by TMLSA and predecessors on Tasiast in 2006, 2010, 2011, 2012, and 2017. In 2010, Red Back submitted 10 core samples from West Branch for a petrological and mineralogical study. Results from the work indicated significant pyrrhotite mineralization developed along foliation planes and associated with accessory magnetite, chalcopyrite, and pyrite (Strashimirov, 2010). Further petrological studies were carried out for Kinross in 2010-2017, including work by Larson (2011), Pollard (2011), and Panterra Geoservices (2012 and 2017), which concluded that quartz veins are pre- and/or syn- tectonic and folded or transposed into the dominant foliation and pyrrhotite is the dominant sulphide mineral in many samples. A mineralogical (gold) characterization study of five samples was completed by Blake (2011a, b). The main conclusions were that coarse gold forms a significant component of the total gold content in the samples and that native gold grains encapsulated within their host (gangue/ore minerals) are relatively uncommon and often exhibit a very fine grain size.

9.7 Exploration Potential

The Tasiast area has significant exploration potential to delineate additional resources both around the Tasiast mine pits (near mine exploration) and within the wider Complex (generative exploration). Exploration targeting and target ranking at Tasiast incorporates all available datasets including; satellite imagery (Worldview-2), airborne geophysical data (high resolution aeromagnetics and VTEM), reconnaissance scale geological prospecting, regional-, district-, and target-scale geological mapping, surface soil and auger sampling (gold and multi-element geochemical data), trenching, reconnaissance style shallow RC drilling on fences and conventional reverse circulation/diamond drilling to define resources.

Page 60
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Exploration efforts to date have discovered additional prospects, gold deposits, and mineral resources along strike to the north and to the south of the main Tasiast area (West Branch and Piment-Prolongation), and generally along the Aouéouat (Tasiast) belt. The deformed greenstone rocks to the west (Imkebden-Kneiffissat) of the Aouéouat belt are notable in that they host quartz-carbonate veins with anomalous gold values, however, to date no significant deposits or mineral resource have been defined. To the immediate north of the Tasiast operation (5 km to 12 km) and within the Guelb El Ghaîcha mining permit, a cluster of deposits referred to as “northern satellites” have been outlined, namely Fennec, C67, and C68 (W and Central). These gold deposits currently host approximately 0.5 Moz Au and are part of the near-mine resource growth strategy. Further north of the Tasiast operation (12 km to 25 km) and within the Imkebden and Tmeimichat mining permits are another cluster of gold deposits referred to simply as “Morris”, namely Tef, Askaf, Central, NE, N1, and N2. This large area saw extensive exploration drilling from 2012 to 2014, which resulted in the discovery of several small deposits best described as narrow, high-grade vein systems. Most of these deposits are open to depth down plunge.

Beyond 25 km from the Tasiast operation, within the northern extents of the Imkebden and Tmeimichat exploitation permits, are several gold exploration prospects that are pending follow-up exploration and drilling, of note are C23, Khnefissat, and Grindstone (Figure 9-7). These prospects have significant surface geochemical footprints and are considered highly prospective.

Page 61
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 9-7: C23,KHN, and GRD targets and soils anomalies (Red Back data)


Page 62
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

10. Drilling
10.1 Summary
--- ---

To date, 15,953 drill holes (14,849 RC, 874 diamond core (DD), and 230 RC pre-collar with DD tail (RC-DD)) for an aggregate total of 1,725,424 m have been completed within the three mining licences that constitute the Tasiast Lands (Table 10-1, Figure 10-1). Drilling activities peaked in 2011 during the West Branch resource definition program. Drilling activities were conducted by various drilling contractors and supervised by geological staff of the project operator. Where programs are referred to by company name, that company was the project manager at the time of drilling and was responsible for the collection of data. Since 2012, most drilling has concentrated on exploration targets north and south of the main mining areas of West Branch, Piment, and Prolongation.

Page 63
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 10-1: Kinrossregional drill hole summary

RC RC-DD Diamond Total Drilling
Company Year Count Metres Count Metres Count Metres Count Metres
Historical Operators
Normandy LaSource 1999 289 24,437 10 525 299 24,962
Normandy LaSource 2000 50 3,603 36 4,871 86 8,474
Midas 2003 84 7,898 4 1,417 29 2,908 117 12,224
Defiance 2003 219 17,914 219 17,914
Defiance 2004 6 1,207 6 1,207
Rio Narcea 2004 106 7,740 106 7,740
Rio Narcea 2006 9 1,435 9 1,435
Rio Narcea 2007 70 7,238 1 236 60 7,375 131 14,849
Red Back 2007 173 18,007 1 173 11 316 185 18,496
Red Back 2008 1,019 112,337 23 2,716 1,042 115,053
Red Back 2009 2,857 200,482 1 300 28 3,492 2,886 204,274
Red Back 2010 1,662 159,801 18 12,766 64 12,454 1,744 185,021
Sub-total 6,544 562,099 25 14,892 261 34,657 6,830 611,649
Current Operator
Kinross 2010 895 73,922 65 45,581 1 683 961 120,186
Kinross 2011 2,691 281,796 95 65,839 185 104,185 2,971 451,820
Kinross 2012 1,562 152,604 2 251 216 50,569 1,780 203,424
Kinross 2013 709 68,434 14 2,757 102 16,367 825 87,558
Kinross 2014 253 20,308 1 383 19 3,959 273 24,650
Kinross 2015 353 33,592 2 1,243 24 2,151 379 36,986
Kinross 2016 194 19,258 14 4,764 2 371 210 24,393
Kinross 2017 504 44,604 2 290 31 2,404 537 47,298
Kinross 2018 226 28,187 10 4,683 10 887 246 33,757
Kinross 2019
Kinross 2020 61 4,062 61 4,062
Page 64
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
RC RC-DD Diamond Total Drilling
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Company Year Count Metres Count Metres Count Metres Count Metres
Kinross 2021 220 15,356 1 441 221 15,797
Kinross 2022 4 429 8 3,444 12 3,873
Kinross 2023 68 5,440 68 5,440
Kinross 2024 565 48,078 14 6,453 579 54,531
Sub-total 8,305 796,070 205 125,791 613 191,914 9,123 1,113,775
Total 14,849 1,358,168 230 140,684 874 226,572 15,953 1,725,424

Notes:

1. Excludes<br> 13 rotary air blast (RAB) holes completed in 2014
2. Data<br> as at December 31, 2024
--- ---
Page 65
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 10-1:Drill hole collar map

Page 66
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
10.2 Historical Drilling
--- ---

Normandy LaSource DevelopmentLtd. (1999-2000)

Between 1999 and 2000, NLSD completed 339 RC holes for 28,039.69 m (including nine RAB holes) and 46 diamond core holes for 5,396.27 m at the Piment deposit area. Drilling was initially undertaken along 200 m spaced east-west sections at 50 m hole spacing, to 50 m to 100 m depth. Drilling methods were predominantly RC with lesser core drilling (HQ, 63.5 mm core diameter) that included RC pre-collars with diamond core tails (NQ, 47.6 mm diameter core).

Newmont Mining Corporation(2001-2002)

No drilling was completed by Newmont during the period that it held the Tasiast property (as part of its acquisition of Normandy).

Midas Gold PLC (2003)

From March to April 2003, Midas drilled 84 RC holes for 7,898 m and 29 diamond drill holes for 2,908.4 m at the Piment deposit area. Diamond drilling was completed mainly with HQ3 core diameter (61.1 mm) and PQ3 core diameter (83 mm) for seven geotechnical holes and three metallurgical holes. In addition, four RC pre-collars with diamond core tails for a total of 1,417.2 m were completed to test down-dip extensions.

Defiance Mining Corporation(2003-2004)

Defiance completed 225 RC drill holes for 19,121 m at the Piment deposit area. The drilling program primarily focused on infilling existing NLSD drill holes along 25 m spaced, east-west drill fences.

Rio Narcea Gold Mines (2004-2007)

Between 2004 and 2007, Rio Narcea completed 246 holes for 24,024 m mostly aimed at extending the Piment deposit northwards towards what is now referred to as Prolongation. Additionally, Ro Narcea completed sterilization drilling over planned waste dumps and tailings storage facility (TSF).

Red Back Mining Inc (2007-2010)

Following the acquisition of Tasiast in 2007, Red Back commenced an infill program of RC drilling to fully define and grow the mineral resources at and around the Piment deposit. In early 2009, step back drilling to the south of Piment discovered what is now known as the West Branch deposit. For the remainder of 2009 and into 2010, RC drilling was ramped up to test the resource potential of West Branch. In late 2009, diamond drilling was increased added to the continuation of West Branch mineralization beyond the depth penetration limits of the RC rigs. A small RC rig was used to conduct shallow (40 m) RC drilling on district targets along reconnaissance style fences. In total, Red Back completed 5,857 drill holes for 522,844 m.

Page 67
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
10.3 Recent Drilling (2010–2024)
--- ---

Upon closing of the Red Back acquisition in 2010, Kinross further accelerated drilling activities and by 2011 a total of 23 drill rigs were operating on site. From 2010 to 2012, drilling was primarily aimed at resource and reserve growth of the West Branch deposit. In addition, drilling activities to support geotechnical, hydrogeological, and metallurgical studies were completed . From 2013 to 2015 drilling shifted focus to the northern licenses (Tmeimichat and Imkebden exploration permits) with an aim to define resources that could be used in a study to support the conversion of both permit types from exploration to exploitation. From 2016 to 20124 drilling was refocused back on the Guelb El Ghaîcha mining permit and continued to test near-mine exploration targets. In total, Kinross has completed 9,123 drill holes for 1,113,775 m (by length this equates to 71% RC holes, 17% DD holes, and 12% combination RC-DD holes).

10.4 Logging Procedures

For the Red Back and Kinross RC drill programs, a geologist first described (logged) the drill cuttings (chips) and then placed a representative sample into pre-labelled plastic RC chip boxes. The logging data was recorded directly in digital format at the rigs into the database system. Data recorded included drill hole ID; sample number and depth; oxidation state; colour; presence of water; lithology; texture; structure; alteration; presence and type of quartz carbonate veining; and presence, type, and abundance of sulphide minerals. Prior to 2009, diamond core logging geologists recorded geological and geotechnical descriptions on separate, hard copy log sheets and then input to Microsoft Excel files.

In 2009, the diamond core logging methodology was converted to the current system of digitally recording geological information via a notebook or tough book computer into a Fusion database which was replaced with AcQuire in 2018. Diamond core logging collected rock quality designation (RQD), lithology, oxidation, alteration, sulphide mineralogy, structure, and veining. All diamond core holes have been photographed in the entirety, with digital camera and are stored in site server.

10.5 Collar Surveys

Pre-Red Back, drill collars were surveyed upon completion, using a Geodimeter 510 total station instrument. During the Red Back and Kinross drilling programs between 2006 to 2012, drill hole collars were surveyed immediately after completing the holes or later, initially with electronic distance measurement (EDM) and differential GPS. Once completed, the Cartesian coordinates were digitally recorded and emailed to the database manager to be imported into the database. Starting in 2013, the survey data was imported directly into the database. From 2013 to date, exploration drill collars are surveyed exclusively with a differential GPS, operated by trained staff with oversight by the Tasiast Survey department. The drill collar locations are collected in the local grid system (Section 9.1) and includes a comprehensive array of permanent and semi-permanent survey stations, which have been checked for internal consistency by numerous EDM traverse closures and numerous comparisons with differential GPS data. Kinross completed an internal audit (re-survey) in 2013 using a differential GPS with 87% of all the project holes identified and validated.

Page 68
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
10.6 Downhole Surveys
--- ---

Prior to 2010, most of the drilling was completed by shallow RC and did not include downhole survey due to the complexities of surveying RC drill holes. Where diamond core drilling was completed (typically in deeper drill holes) and in selective cases of RC drilling, Humphries gyroscope, Maxibore, and Reflex single shot downhole survey tools were used. From 2010 to 2013 Kinross used three different contractors to complete downhole surveys: ABIM solution in 2010 using SPT004 NS GYRO (measurements were taken every five metres), WELL FORCE International from 2010 to 2012 using Gyro and MEMS (measurements were taken every 10 m), and SEMM Logging from 2011 to 2013 using SPT Gyro 07 and SPT Gyro 109 (measurements were taken every five metres). From 2014 to 2017, the downhole surveys were completed by trained Kinross staff using MEMS and North Seeking Gyro 103 (measurements were taken every 10 m). In 2018, downhole surveys were completed with Reflex EZ Gyro, operated by drilling companies (measurements were taken every 10 m for core holes and 24 m for RC holes). Considering the complete project database; 60% of all drill holes have downhole survey data (58% of RC, 99% of RC-DD combination, and 77% of DD holes).

10.7 Recovery

Prior to 2013 total RC sample weights were not collected routinely, however, based on selective available data, RC recoveries were determined to be acceptable. From 2013 onwards, total sample weights were routinely collected and confirm that recoveries are good. Recovery data for diamond core holes was collected from all Red Back and Kinross drill programs. Based on 17,718 measurements, the average total recovery from core runs (in both oxide and fresh) is 98% and the RQD is greater than 93%. Measurements from downhole depths below 50 m (approximate oxide-fresh boundary) returned values of 99% and 95% for total recovery and RQD, respectively, in comparison to shallower depths where total recovery is 87% and RQD averages 43%.

10.8 Drill Hole Orientation

Both the Piment and West Branch deposits dip eastward at moderate angles (approximately 40° to 60°). In consideration of the deposit geometry, Exploration and Resource definition drilling at Piment and West Branch was inclined at approximately 60° towards azimuth 270° (drilling east to west). The Piment and shallow portion of West Branch deposits were initially drilled along 50 m spaced sections at approximately 50 m drill hole spacing. Infill drilling was later completed along 25 m sections to approximately 25m drill hole spacing. Deeper drilling (down dip and down plunge at West Branch) was completed along 50 m spaced sections with approximately 75 m hole spacing.

Page 69
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
10.9 Geotechnical, Hydrogeological, and Metallurgical Drilling
--- ---

Geomechanical drilling campaigns for collection of rock mass characteristics and groundwater conditions were conducted across El Ghaicha to identify potentially suitable locations for mine infrastructure. The various geotechnical studies completed, based upon the progress of pit development, include the following:

· Golder<br> Associates (2004): This study provided preliminary pit slope design parameters for the oxide<br> zone and fresh zone. Results were based on the analysis of geotechnical data collected in<br> 2003 and were used in the preliminary mine planning and development of the project. The study<br> focused on the BIF lithology and four open pits were proposed within this lithological unit.<br> Rock testing was confined to this unit, and the drill hole data was subject to a strong directional<br> bias with almost all boreholes drilled with 60° dip and 270° azimuths.
· Scott<br> Wilson (2008a,b,c; 2009): This study provided slope stability analysis and ultimate pit slope<br> design parameters of the four open pits (Piment North, Central, South-North, and South-South)<br> for the oxide zone and fresh zone. Results were based on the analysis of the geotechnical<br> data collected in 2008, which was based on an orthogonally oriented drill hole program. Geotechnical<br> and discontinuity data were collected and processed to form eleven pit sectors based on geotechnical<br> characteristics. The study also included a review of the seismicity and hydrogeology of the<br> Piment site. The 2008 investigation also focused on logging the wider variety of lithologies<br> and structural features encountered within the four open pits. Laboratory and field rock<br> strength testing was also undertaken on representative samples to establish base design values.<br> Each pit sector was compared to the discontinuity sets to identify kinematically feasible<br> modes of failure. Slope designs were done for a base pit, as defined by the “$700 (ultimate)<br> pit shell” provided by TMLSA. A series of recommendations included overall slope angle,<br> bench stack angles, inter-ramp angles, and the structural and bedding controls based on operational<br> assumptions adopted for safe operation.
--- ---
Page 70
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
· Scott<br> Wilson (2011): This study provided slope stability analysis and ultimate pit slope design<br> parameters for the West Branch area. Results were based on the analysis of geotechnical data<br> collected in 2010, which was based on an orthogonal oriented drill hole program. Geotechnical<br> and discontinuity data were collected and processed to form four broad pit sectors based<br> on geotechnical characteristics. The collected data was based on the configuration of drill<br> holes of the West Branch proposed pit shell. The focus of the study was on logging a wider<br> variety of lithologies and structural features encountered within the open pit footprint,<br> based on experiences from the study conducted in 2008. Laboratory and field rock strength<br> testing was also undertaken on representative samples to establish base design values. Each<br> pit sector was compared to the collected discontinuity sets to identify kinematically feasible<br> modes of failure. Slope designs were performed for a base of pit, as defined by a 30 kt/d<br> CIL pit shell. A series of recommendations included overall slope angle, bench stack angles,<br> inter-ramp angles, and the structural and bedding controls based on operational assumptions<br> adopted for safe operation.
--- ---
· Scott<br> Wilson (2011): This study provided a slope stability analysis and refined the ultimate pit<br> slope design parameters for the West Branch area. Results were based on analysis of the geotechnical<br> data collected in 2010 and 2011. A total of 23 geotechnical and six hydrogeological drill<br> holes were completed. Two pits at West Branch were designed (North and South pits).<br> The northern pit assumes a 700 m pit depth, whereas the southern pit assumes a shallower<br> depth.
--- ---
· Golder<br> Associates (2014) and Schlumberger (2014): A geotechnical and hydrogeological drilling program<br> for the West Branch pit was completed from March to June of 2013 (eight holes at<br> 4,612 m). The purpose of the drilling and investigation program was to provide additional<br> geotechnical and hydrogeological data where data was lacking and to complement those data<br> that currently exist from previous investigation campaigns.
--- ---

Hydrogeological drilling was conducted in the area of the water bore field, to identify sufficient water for processing. Large diameter core holes (typically PQ) were completed to collect samples for metallurgical test work.

10.10 Comments on Drill Programs

In the opinion of the QP, the quantity and quality of the lithological, geotechnical, collar, and downhole survey data collected in exploration and infill drill programs are sufficient to support mineral resource and mineral reserve estimation as follows:

· Core<br> logging meets industry standards for gold exploration.
· Collar<br> surveys have been performed using industry-standard instrumentation.
--- ---
· Downhole<br> surveys have been performed using industry-standard instrumentation.
--- ---
· Recovery<br> data from core drill programs are acceptable.
--- ---
· Geotechnical<br> logging of drill core meets industry standards for open pit operations.
--- ---
Page 71
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
· Drilling<br> is normally perpendicular to the strike of the mineralization. Depending on the dip of the<br> drill hole and the dip of the mineralization, drill intercept widths are typically greater<br> than true widths.
--- ---
· Drill<br> orientations for Tasiast are appropriate for the mineralization style and have been drilled<br> at orientations that are optimal for the orientation of mineralization for the bulk of the<br> deposit area.
--- ---
Page 72
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
11. Sample Preparation, Analyses, and Security
--- ---
11.1 Sampling Method and Approach
--- ---

Project staff of the operator at the time were typically responsible for the following:

· Sample<br> collection
· Core<br> splitting
--- ---
· Delivery<br> of samples to the analytical laboratory
--- ---
· Density<br> (specific gravity) determinations
--- ---
· Sample<br> storage
--- ---
· Sample<br> security
--- ---

Geochemical and TrenchSampling

As the geochemical and trench data have been superseded by information from drilling and mining operations, these sample types are not discussed further in the Technical Report. This information is not relied on for use in geological modelling or resource estimations.

Normandy LaSource DevelopmentLtd.

Little information has been kept or is available regarding drilling procedures used in drilling completed by NLSD.

Defiance Mining Corporationand Rio Narcea Gold Mines

RC Drill Holes

All RC holes were sampled at one-metre intervals and each sample was collected in a large plastic sample bag that was held below the cyclone spigot by a drill helper. All samples were sent for assay except those that originated from the non-mineralized hanging wall at the start of each hole. To avoid sample contamination, after a drill run was completed, blow-backs were carried out at the end of each 6.0 m run by the driller whereby the percussion bit was lifted off the bottom of the hole and the hole was blown clean. When water was encountered in the hole, the driller would dry out the hole by increasing air pressure into the hole and lifting and lowering the rods prior to continuing the drilling.

Throughout the Defiance RC drill program, logging of all RC drill holes was conducted by the field geologist at the drill site. After each drilled 1.0 m interval, the sample was weighed, sieved, and split to give a two kilogram to three kilogram sample for analysis.

Page 73
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

A representative subsample for geological logging was collected from the large sample bag by spearing a small diameter PVC pipe into the bag and emptying the contents of the PVC pipe into a hand sieve.

At the end of each day or at the completion of a RC hole, calico sample bags for RC drill holes completed that day were loaded onto a 4x4 pick-up truck by the field geologist and then delivered directly to the on-site sample preparation laboratory. Once the samples were unloaded from the pick-up truck and both the field geologist and laboratory technician confirmed receipt of all calico sample bags, the field geologist then registered the sample number sequence in the database.

Diamond Drill Holes

Upon completion of geological and geotechnical core logging of a diamond drill hole, Defiance’s core logging geologist identified the sections of core to be sampled and analyzed for gold. Once identified, the core logging geologist measured and marked out the sample intervals onto the uncut core down the right-hand side of the orientation line. Individual sample intervals were recorded onto a core sampling sheet. The core was sampled according to lithological boundaries and vein widths, and the maximum sample interval did not exceed 1.50 m in length.

At the core cutting facility, the drill core boxes were stacked in ascending order to avoid sampling mix-ups. The core was cut on the orientation line marked by the geologist and the right-hand side of the core (looking down hole) was placed in a numbered calico bag.

Once the core for a drill hole was cut and sampled, the core cutter and the core logging geologist then delivered the samples, with the core sampling sheet, to the preparation laboratory technician for sample preparation.

Red Back Mining Inc andTMLSA

RC Drill Holes

To minimize down-the-hole deviation, RC drilling is conducted with contract single and multi-purpose rigs using a standard 5½” face sampling hammer leading a 4½” rod string.

The entire sample is collected in a large plastic bag tightly clamped onto the cyclone base. The entire length of each RC hole is sampled. A one-metre sample length is used in all holes. Dry samples, of nominal 20 kg to 25 kg weight, are reduced in size by riffle splitting using a three stage Jones riffle splitter to approximately three kilograms to four kilograms and then placed in pre-numbered sample bags for dispatch to the assay laboratory. A record is made at the drill site of the sample identity numbers and corresponding intervals, and this is also recorded in the geological log.

Page 74
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

After September 2013, RC samples with a nominal weight from 36 kg to 40 kg (each one metre) were collected in a large plastic bag, tightly clamped onto the cyclone base and reduced in the field by 50/50 manual riffle splitters. Approximately six kilogram to eight kilogram weight samples were placed into pre-numbered sample bags to dispatch to the laboratory. Every 20 samples, a field duplicate was collected as part of the quality assurance/quality control (QA/QC) procedure.

Diamond Drill Holes

For diamond drilling, core was transported from the drill rigs to the core facility where geological and geotechnical core logging was completed. The geologist marked one-metre intervals and orientation lines (bottom of hole) along the core axis for core cutting. A record was made at the core facility of the sample identity numbers and corresponding intervals. At the core cutting facility the drill core boxes were stacked in ascending order to avoid sampling mix-ups. The core was cut on the metre and orientation lines and the left-hand side of the core looking downhole was placed in a numbered plastic bag with sample ticket.

Once the core for a drill hole was cut, sampled, and bag sealed, the core was then stored in a secure area (either locked 40 ft shipping container or fenced off area) for sample dispatch.

All the sampling processes for RC and diamond drilling were handled under TMLSA’s chain of custody.

Density/Specific GravityMeasurement

The results from 1,699 bulk density determinations completed by NLSD at Tasiast during previous drilling programs are available. The origin of the sample, its borehole number, and sample depth were entered as an individual MS Access database file into NLSD’s project database. Information on the sample size/length, lithology, and oxidation state was not recorded in the NLSD database. The bulk density measurement for each NLSD sample was derived by using the Weight in Air/Weight in Water (Archimedes) method. The oxidized core samples were sealed with molten wax and reweighed to determine the weight of the paraffin coating, prior to weighing in water. The bulk density determinations were done on short (five centimetre), half core specimens, taken at close intervals. The NLSD bulk density data were collected from one core hole in the Piment South area and from 13 core holes from the Piment Central area.

A total of 131 bulk density measurements were carried out on lengths of complete drill core by Defiance during their programs. Density determinations were undertaken prior to core sawing on 131 samples of approximately eight centimetres to 15 cm in length and of both HQ and HQ3 diameter. The water displacement method was used.

From 2008 to December 2011, Red Back and TMLSA completed 24,702 specific gravity determinations of bulk density using the Archimedes method. The samples were selected to provide a representative suite of densities covering all major lithology types and from all oxidation levels.

Page 75
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Initial Red Back and TMLSA density determinations were done using wax-coated samples for both oxide and primary material. This procedure was changed by using uncoated core samples for only primary material to speed up the test work. Duplicate tests with one-wax coated samples for every lithology per hole were done to evaluate bias between the data pairs. Approximately 650 duplicate tests were done up to December 2011. Initial analysis of the check samples showed very good correlation between the uncoated and coated density values. A total of 90% of the dataset shows a difference of 1% variability between the sample pairs (coated and uncoated).

11.2 Analytical Laboratories

Sample preparation was undertaken on site by NLSD staff during their drill programs. Analytical laboratories used were the BRGM laboratory in Orleans, France and OMAC Laboratories Ltd. (OMAC) in Ireland. QA/QC was undertaken by Genalysis Laboratories (Genalysis) in Perth, Australia, and SGS Laboratories in France. Laboratory accreditations at the time are not known; all analytical laboratories were independent of NLSD.

During Defiance’s RC and diamond drill hole programs, the analytical work was carried out by SGS Analab in Kayes, Mali and by Abilab located in Bamako, Mali. Analab is an ISO accredited laboratory whereas Abilab is not ISO accredited. The laboratories were independent of Defiance.

Following Red Back’s acquisition of the Tasiast deposit in August 2007, an on-site SGS Analab sample preparation facility became operational. Prior to that time, samples had been prepared on site by the previous owners’ technical crew members under supervision of senior geological staff. All drill samples since 2007 have been prepared and analyzed under contract by SGS on site and by SGS Analab in Kayes, Mali, SGS Analab in Morila, Mali, and SGS in Ouagadougou, Burkina Faso. Laboratories were independent of Red Back. The two SGS laboratories hold ISO9000 accreditations.

In December 2010, SGS constructed and commissioned a mobile sample preparation facility in Nouakchott, Mauritania, and selected samples were submitted to the facility for preparation. In late 2011, a new on-site SGS preparation and assay laboratory was commissioned at Tasiast, with a capacity of up to 2,000 samples per day. In mid-2012, TMLSA stopped sending exploration samples to the SGS Tasiast preparation laboratory due to quality control concerns. Due to the large volumes of samples and turnaround time issues, TMLSA started sending samples to nine different accredited laboratories outside the country for sample preparation and assays. These were Actlabs Burkina Faso (ISO 9001), ALS Johannesburg (ISO 9001), ALS Kumasi (ISO 9001), ALS Loughrea (ISO 9001), ALS Romania (ISO 9001), ALS Vancouver (ISO 9001), SGS Kayes (ISO 9001), SGS Morila (ISO 9001), and SGS Ouaga (ISO 9001). In April 2013, ALS Chemex took over the Tasiast laboratory facilities and undertook the sample preparation and analytical services. All drill hole samples have been prepared and assayed by the ALS Tasiast laboratory (ISO 9001).

Page 76
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
11.3 Sample Preparation
--- ---

Midas, Defiance, and Rio Narcea RC drill hole sample preparation included using the entire RC calico sample bag, which was oven dried for 24 hours and then weighed before pulverizing the entire two kilogram to three kilogram subsample using a Labtecnics LM5 mill. Each core sample was crushed to -10 mm in a jaw crusher, and the entire sample was pulverized to P90 (90% passing) at 75 µm using a Labtecnics LM5 mill. Barren dune sand was used to clean the bowls after every sample. The pulverized material was sampled using a spatula, and two 120 g pulp sub-splits were taken; one packet was prepared for shipment to the assay laboratory and one packet remained on site for future reference. Blanks of dune sand and certified reference standard were then inserted with the field samples.

Sample pulp shipments were conducted on a weekly basis. The samples were transported in secured wood boxes to Nouakchott, where Mauritanian Customs inspected the shipment and released the proper documentation for exportation. The boxes included a sample submission sheet prepared by the laboratory manager. Samples were then shipped by airfreight to SGS Analab, in Kayes.

At SGS Tasiast and SGS Nouakchott, the entire RC and core sample was oven-dried for 24 hours in a cleaned metal dish, weighed and then crushed to 75% passing at two millimetres. At SGS Tasiast, a 1.5 kg subsample was split using a Jones riffle splitter and pulverized in a Labtech Essa LM2 ring pulverizer using a two kilogram bowl to 85% passing at 75 µm. At SGS Nouakchott, the sample was split once using a Jones riffle splitter and pulverized in a Labtech Essa LM2 ring pulverizer using a two kilogram bowl to 85% passing at 75 µm. Both laboratories took a 200 g subsample for gold (Au) fire assay.

At the SGS Tasiast laboratory and relocated mobile sample preparation facility, the procedure for sample analysis remained unchanged, however, subsample size at ALS Tasiast increased to two kilograms, to improve the precision of results.

For RC and core samples processed by SGS Analab in Kayes, samples were stockpiled in a secure area within the Tasiast core facility and collected by a truck contracted by either Analab or TMLSA for shipment to Kayes. The samples were enclosed and secured in a large tarpaulin and transported directly from the site to the laboratory. The entire core or RC sample was oven dried for 24 hours and then weighed before pulverization. Samples were crushed to 75% passing two millimetres, and two 1.5 kg subsamples were split using a Jones riffle splitter and pulverized in a Labtech Essa LM2 ring pulverized using a two kilogram bowl to 85% passing at 75 µm. These two pulps were recombined before being subsampled (200 g) for an Au fire assay.

Page 77
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

After ALS Chemex took over the laboratory facilities at Tasiast in early 2013, several changes were introduced at the sampling preparation stage, including:

· Drying<br> the entire RC or core sample for three to four hours at 105 ºC.
· Registering<br> the dry weight.
--- ---
· Crushing<br> the entire sample to 80% passing two millimetres. In November 2013, it was decided to<br> increase the passing to 85% passing two millimetres. Every 20 samples must generate<br> a preparation duplicate.
--- ---
· Splitting<br> the samples using a Jones riffle splitter to obtain one kilogram and pulverizing the samples<br> to 85% passing 75 µm.
--- ---
· Taking<br> 200 g for analysis. Every 20 samples must generate a pulp duplicate.
--- ---
11.4 Sample Analysis
--- ---

For the samples processed by the BRGM laboratory on behalf of NLSD, the following methods were used:

· Roasting<br> (77 Phase 1 samples and all Phase 2 samples).
· Total<br> attack (hydrofluoric acid and aqua regia).
--- ---
· Atomic<br> absorption (AA) analysis, detection limit: 20 ppb Au (Phase 1) and 100 ppb Au (Phase<br> 2).
--- ---

Check analysis of 74 Phase 1 samples showed no significant variations between roasted and non-roasted samples (Guibal et al., 2003).

OMAC used the following methods on samples processed for NLSD:

· Ignition<br> / Aqua Regia Digest / MIBK Extraction / AA on 30 g sample; detection limit: 10 ppb Au; 10%<br> repeats.
· Fire<br> assay (30 g sample): re-analysis of 903 mineralized samples (Phases 1 & 2) + all<br> samples >1 g/t Au and those <1 g/t Au which were included in mineralized intersections<br> (Phases 3 & 4); detection limit: 10 ppb Au.
--- ---

All the sample pulps from the Midas, Defiance, and Rio Narcea drill programs were analyzed for gold using a 50 g fire assay with an atomic absorption spectroscopy (AAS) finish at both laboratories. The Analab 50 g fire assay/AAS method (FA50) has a lower detection limit of 0.005 g/t Au; Abilab’s lower detection limit is 0.010 g/t Au.

Page 78
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Analab routinely ran random check assays in all batches, however, when the laboratory was notified of possible samples containing high values of gold for the core samples, Analab carried out a fire assay / AAS method, with repeats in some cases, as well as fire assay / gravimetric analysis for samples grading greater than 5.00 g/t Au. Analab also provided Defiance with its internal QA/QC data during the analysis period.

For Red Back and TMLSA samples, sample pulps were analyzed for gold using a 50 g fire assay with an AAS finish with a detection limit of 0.01 g/t Au. Results higher than five grams per tonne gold were re-analyzed by fire assay technique and gravimetric finish. In 2012, TMLSA began gravimetric finishes for gold above five grams per tonne and began screened metallic fire assays.

11.5 Independent Review Work - Quality Assurance and Quality Control

SRK Consulting (2003)

The following is summarized from (Guibal et al., 2003). Kinross has not sourced a copy of the original data (field duplicates, blanks, and standards) supporting the analysis and findings of this study, however, this work has been retained in this document for completeness, and it does indicate that historical drill programs were supported by QA/QC samples and monitoring. Kinross notes that in 2018 the Tasiast drill hole database was completely rebuilt from laboratory certificates (where available, otherwise migrated from the previous database and denoted as such) following several integrity issues encountered during migration to a new database management software. In this context, some findings in this section may not be completely accurate.

Most of the documented QA/QC cited by SRK Consulting (SRK) in 2003 on NLSD samples are related to measurements of the analytical errors through pulp duplicates, where two analytical methods (AAS and fire assaying [FA]) are compared (Guibal et al., 2003). No significant problem was detected. In early 2003, a total of 429 pulp samples, collected by staff from Midas and representing close to 10% of the mineralized samples within the wireframed resources, along with 54 standards (of values 0.5 g/t, 1.66 g/t, and 3.22 g/t Au) and 18 blanks were re-assayed by Genalysis. SRK noted that the Genalysis results compared well with the database and standards and blanks were assayed within acceptable limits.

For the Defiance and Rio Narcea drill programs, a total of 21,686 RC sample pulps, including field duplicates, blanks, and standards, and 904 diamond drill hole core sample pulps, including field duplicates, blanks, and standards, were shipped in 16 batches, of which 14 went to SGS Analab Kayes and two went to Abilab. Included within these sample batches were a total of 774 field duplicate samples, each one being a second split from a one metre interval field sample bag, and 1,136 preparation duplicates, each one being a second split from the pulverized RC and core sample at the preparation laboratory.

Page 79
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

The analytical QA/QC program implemented by Defiance was monitored by the routine submission of commercial Certified Reference Materials (CRMs) purchased from Gannet Holdings Pty. Ltd. (Gannet) of South Perth, Western Australia. CRMs were inserted at every 20th sample and an internally prepared coarse blank sand inserted at every 10th sample within the RC and core sample stream. Field duplicates were collected by the field geologist after the completion of each RC hole and the number of field duplicates on a per RC hole basis was dependent on the length of the hole or equivalent to every 20th sample. Preparation duplicates were selected for every 20th sample number in a sequence and submitted as a separate sample number series on a per batch basis.

Heberlein Geoconsulting(2011–2013)

The following is summarized from (Kinross, 2019). Kinross has not sourced a copy of the original data (field duplicates, blanks, and standards) supporting the analysis and findings of this work, however, this work has been retained in this document for completeness, and it does provide an indication that the historical drill programs were supported by QA/QC samples and monitoring. Kinross notes that in 2018 the Tasiast drill hole database was completely rebuilt from laboratory certificates (where available, otherwise migrated from the previous database and denoted as such) following several integrity issues encountered during migration to a new database management software. In this context, some findings in this section may not be completely accurate.

In 2011, TMLSA engaged an independent consultant to provide a regular review of the QA/QC data. Issues identified during the early review in September 2011 (Heberlein, 2011), such as switched standards and standard identification, have been corrected and control actions implemented.

Additional actions implemented to address other recognized issues, such as duplicate precision, include the following:

1. Conducted<br> routine crushing and analyzed pulverized duplicate samples at the majority of the laboratories.
2. Conducted<br> gradual replacement of three tier-riffle splitters and cone splitters on RC rigs by 50/50<br> manual riffle splitters.
--- ---
3. Established<br> a dedicated group to control and monitor sampling, dispatch, and quality control analytical<br> results.
--- ---
4. Assigned<br> a Tasiast technician permanently to the on-site Tasiast exploration preparation facility<br> to monitor and control the workflow.
--- ---
5. Conducted<br> a routine independent-consultant review of data and laboratory audits.
--- ---
6. Reviewed<br> various sample volume and preparation methods that have resulted in larger samples (between<br> five kilograms and 10 kg) collected from RC rigs in 2013.
--- ---
Page 80
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

TMLSA’s QA/QC process before 2012 was as follows:

· A<br> routine analytical sample ‘field duplicates’ were collected every 20th sample<br> and submitted in blind sequence.
· For<br> RC samples, a further representative triplicate sample was routinely collected every 60th<br> original sample in the sequence, and retained for later submission to a third-party, independent<br> referee laboratory.
--- ---
· Analytical<br> ‘blanks’ were inserted every 20th original sample and were taken from barren<br> dune sand collected from a source distant from the mine.
--- ---
· CRMs,<br> in pulp form, from Gannet, Rocklabs, and Geostats Pty Ltd (Geostats) were selected based<br> on certain resource thresholds, and inserted as standards every 20th sample.
--- ---
· All<br> QA/QC samples were inserted by the rig geologist at the rig.
--- ---
· Grades<br> of standards to be used were selected by the senior geologist and provided to the rig geologist<br> in the rig box.
--- ---
· TMLSA<br> submitted 16% routine QC samples within the sample string.
--- ---
· Holes<br> were submitted by the rig geologist directly to the on-site laboratory as individual batch<br> jobs, or dispatched from the site to Mali, Burkina Faso and South African laboratories.
--- ---
· Started<br> using the certified standard deviation (SD) of the mean value for the CRM (previously ±10%<br> of mean value), rules for batch pass and failures.
--- ---

In 2012, a QA/QC team was established and managed the sampling protocols, sample transport, sample tracking, and reporting.

In 2012, the quality control processes were modified as follows:

· Analytical<br> ‘blanks’ were inserted after every 20th original sample and were taken from gold<br> barren material (not sand) collected from a source distant from the mine. This material was<br> submitted blind with the samples dispatched, as with other samples. RC blanks were crushed<br> to simulate the RC sample grain size. Diamond drill blanks were used that resembled the diamond<br> drill core size.
· Canadian<br> Centre for Mineral and Energy Technology (CANMET), Rocklabs, and Geostats CRMs in pulp form<br> were selected based on certain resource thresholds and inserted as standards every 20th sample.
--- ---
Page 81
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
· All<br> QA/QC samples were inserted by the QA/QC team in the exploration yard, except the field duplicates<br> that were generated at the drill. Grades of standards to be used were selected by the geologist<br> that logged the RC or diamond drill holes, and they were provided by the QA/QC team. For<br> every batch, TMLSA inserted 16% QC samples within the sample string. Holes were submitted<br> by the QA/QC team directly to the on-site laboratory as individual batch jobs, or dispatched<br> from the site to Mali, Burkina Faso, and South African laboratories.
--- ---

Twice in 2013, 5% of the samples (pulp) were sent to a third laboratory to be checked.

SRK (2013)

In April 2013, SRK conducted a review of the analytical quality control procedures and results for Tasiast (Chartier, 2013). The objective of the review was to provide an independent analysis of the sampling procedures and a review of the analytical quality control results for the data to be used in resource estimation.

SRK visited the Complex site from October 11 to 15, 2013. SRK also visited a third-party preparation laboratory operated by SGS Minerals, in Nouakchott, Mauritania. The purpose of the site visit was to audit the technical data collection and processing and to collect all relevant information for the compilation of the Sample Preparation, Analyses, and Security and Data Verification sections of a technical report. SRK was given full access to relevant data and conducted interviews with Kinross personnel to obtain information on past exploration work and understand the procedures used to collect, record, and analyze historical and current exploration data.

SRK reviewed the field procedures and analytical quality control measures at Tasiast. In SRK’s opinion, Kinross personnel used care in collecting and managing field and assay exploration data. The sample preparation, security, and analytical procedures used by Kinross were consistent with generally accepted industry best practices and are therefore adequate to support the mineral resource estimation.

A summary of SRK’s main conclusions were:

· The<br> sampling procedures used meet industry best practices. All borehole sampling was conducted<br> by appropriately qualified personnel under the direct supervision of appropriately qualified<br> geologists. The sample preparation, security, and analytical procedures were consistent with<br> generally accepted industry best practices and are therefore adequate to support Mineral<br> Resource estimation.
· The<br> paired data results are consistent with results expected from gold mineralization in an epigenetic<br> deposit that is structurally and lithologically controlled.
--- ---
· Results<br> from the CRMs are acceptable.
--- ---
Page 82
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
· The<br> non-certified field blanks consistently returned values at or below the detection limit at<br> most primary laboratories.
--- ---
· SRK<br> concurred with Heberlein (2013) that sample preparation procedures are failing to properly<br> homogenize the samples. SRK attributes part of that failure to a prominent nugget effect<br> and notes that control charts display no apparent bias between original and duplicate samples.
--- ---
· Much<br> of the analytical data informing the MRE was derived from several different unaccredited<br> laboratories, including the mine laboratory operated by SGS.
--- ---

TMLSA (2017)

As part of database migration from Fusion to acQuire, the QA/QC data from 2007 to 2017 for the Guelb El Ghaîcha area, which contains West Branch pit, all Piment and Prolongation pits, and the northern satellite deposits (C67, C68, and Fennec), were reviewed in preparation for the 2019 model update. The purpose was to validate all quality control assays available in the database since Red Back’s acquisition of the project in 2007, and to ensure that only assays with acceptable quality control results are being used for resource estimation. A total of 16 different assay laboratories were involved for the sample analysis in this period. Table 11-1 presents the summary of quality control samples reviewed during this time. A total of 44,003 standard assays and a total of 12,261 blank assays were exported from the Tasiast acQuire database for review. Duplicate assays were not included because the purpose of the review was to select the assays with acceptable quality control results for the resource estimation; duplicate assays present only precision information on each sampling/subsampling stage, which does not provide the pass/fail criteria.

Page 83
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 11-1: QA/QC samplesby laboratory

Laboratory Standard Blank Total
Actlabs Burkina Faso 501 486 987
ALS Chemex Ouaga 675 28 703
ALS Johannesburg 1,951 1,502 3,453
ALS Kumasi 744 669 1,413
ALS Loughrea 439 387 826
ALS Nouakchott 82 84 166
ALS Romania 987 846 1,833
ALS Tasiast 2,703 2,815 5,518
ALS Vancouver 437 287 724
SGS Kayes 17,801 1,368 19,169
SGS Lakefield 5 0 5
SGS Morila 7,966 263 8,229
SGS Ouaga 1,783 99 1,882
SGS TML 7,929 3,427 11,356
Total 44,003 12,261 56,264

The exported standard and blank assays were grouped and assessed by Lab Job number, which is equivalent to sample shipment number. The Lab Job number may contain multiple assay batches. The pass/fail assessment was performed for 5,302 Lab Jobs. The pass/fail criteria applied were plus/minus three standard deviations (3SD) for standards and less than or equal to 0.05 g/t Au for blanks. A total of 48 different standards and two types of blanks (barren sand and barren pegmatite) were used as QC samples. Among these 48 standards, 16 historical standards that were used from 2007 to 2011 do not have any information on the actual standard code or their standard deviations. A constant standard deviation of 3.33% had been used for these historical standards in quality control checks and this caused a significant number of standards failures due to the challenging control limit of 10.0% (3 x 3.33%). A decision was made to re-assign a constant standard deviation of 6.67% for these historical standards, considering the acceptable industry practice standard deviation level of 5% to 7% for gold standard. This resulted in reducing the number of unnecessary quality control failures. The average certified standard deviation of all standards, including the historical standards, was 5.6%, which is well within the acceptable industry practice level mentioned above.

Numerous occasions of quality control sample swaps were identified, especially during 2008-2012 drilling campaigns when there were a high number of drills running simultaneously with limited trained work force. The total number of swaps identified was 906, which is equivalent to 1.6% of all quality control samples reviewed. Most of the swaps were easily identifiable in the quality control chart by the presence of cluster(s) of noticeably different grade value(s) compared to the certified value (Figure 11-1).

Page 84
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 11-1: Standard control plot for StandardG305-2 from SGS Morila

The number of quality control sample swaps by year is summarized in Figure 11-2. The number of swaps has decreased to an acceptable level since the start of the 2013 drilling campaign. The identification of swaps resulted in lowering the quality control failure rate significantly.

Page 85
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 11-2: Summary of QC sample swaps byyear

The standards and the blanks that failed quality control were requested to be re-analyzed where a material impact on the reported results was considered. In this event that the original pulps were unavailable, the failed assays were simply excluded from the resource estimation.

An average accuracy of 98% was achieved for the internationally accredited standards (Figure 11-3). This implies that 98% of the total standard samples submitted to the various laboratories reported within an acceptable limit of ±3SD. The blank samples submitted to the various laboratories reported similar results with 98% of the samples below 0.05 g/t Au.

Heberlein (2013) noted measurable improvement in the QA/QC procedures over the course of his involvement in the project, especially in duplicate assays (Table 11-2). The improvement has resulted in a measurable increase in the overall precision of the analytical results. Early precision estimates of field duplicate results (containing the total error of sampling, preparation, and analysis) showed unacceptably high values for both core and RC duplicate samples. The initial analysis of duplicate results in 2011 determined precisions above 85% range for drill core and above 80% range for RC chips. Improvements to sampling and sample preparation procedures, particularly at the ALS Tasiast Laboratory, have brought the duplicate precision down to the 45% range, which is reasonable for the nugget style of mineralization at Tasiast.

Page 86
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table11-2: 2007-2017 Resource QA/QC results

Laboratory Number of Standards Number of Blanks % Standards Within 3SD **** % Banks ≤0.05 g/t ****
Actlab Burkina Faso 501 486 98 % 98 %
ALS Chemex Ouaga 675 28 97 % 100 %
ALS Johannesburg 1,951 1,502 95 % 94 %
ALS Kumasi 744 669 90 % 89 %
ALS Loughrea 439 387 100 % 100 %
ALS Nouakchott 82 84 100 % 100 %
ALS Romania 987 846 100 % 99 %
ALS Tasiast 2,703 2,815 100 % 100 %
ALS Vancouver 437 287 98 % 99 %
SGS Kayes 17,801 1,368 99 % 100 %
SGS Lakefield 5 0 100 % -
SGS Morila 7,966 263 98 % 89 %
SGS Ouaga 1,783 99 100 % 100 %
SGS TML 7,929 3,427 94 % 97 %
Total 44,003 12,261 98 % 98 %

Notes:

1. SD = Standard Deviation

SLR Consulting (Canada) Ltd. (SLR) (2024)

In 2024, as part of an external audit of the Complex’s Mineral Resources and Mineral Reserves, SLR received raw QA/QC data collected from 2013 to 2024 at the site. Their work and findings (SLR, 2024) are summarised below.

Blanks and CRMs were used as control samples during this period, with a total of 24,681 control samples submitted to ALS Tasiast . No duplicates were included in the drilling sample streams. Observations from SLR’s review of the Kinross Tasiast QA/QC database are detailed in the following discussion.

Certified Reference Materials

Results of the regular submission of CRMs are used to identify potential issues with specific sample batches and long-term biases associated with the primary assay laboratory. SLR reviewed the results from 22 different types of CRM used.

A total of 12,345 commercial CRMs, sourced from either Geostats or OREAS, were inserted into streams of drilling samples and submitted to ALS Tasiast. The CRM samples were inserted across different project areas according to the distribution shown in Table 11-3. The upper and lower control limits were determined using 3SD above and below the expected value (EV).

Page 87
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

No significant failures were observed following this criterion, and overall, good accuracy was noted for the laboratory, with biases ranging between -5.0% and 3.3%, as presented in Table 11-4. CRMs with a count smaller than five were disregarded as they are not representative.

Table 11-3: Distribution of CRMs by deposit:2013–2024

PROJECT
Year Elgaicha Imke Ndaouase Tasouth Teme Grand<br><br> Total
2013 587 238 7 138 127 1,097
2014 655 182 - 1,091 1,013 2,941
2015 864 948 - 660 1,453 3,925
2016 911 - - 250 - 1,161
2017 284 - - 1,850 - 2,134
2018 216 - - 122 - 338
2020 143 - - 2 - 145
2021 440 4 - - - 444
2023 79 - - - - 79
2024 81 - - - - 81
Grand Total 4,260 1,372 7 4,113 2,593 12,345

The CRMs cover a good range of gold grades analyzed by the FA method, however, SLR noted that seven types of CRMs were inserted in 2024 alone. SLR recommended reducing this number to a maximum of three or four material types: one approximating the cut-off grade, one or two close to the average grade, and a high-grade CRM. This reduction will be sufficient to monitor laboratory performance and track potential emerging biases or systematic failures over extended timeframes.

Page 88
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table11-4: Summary of CRM samples used in the 2013 to 2024 QA/QC programs

CRM Year Range Num Samples Bias (%) Mean EV SD Num Outliers Outliers (%)
OREAS-15f 2013-2015 2153 -1.28 0.33 0.33 0.02 8 0.37
G912-7 2014-2024 1804 -0.75 0.42 0.42 0.02 10 0.55
G910-2 2014-2024 1766 1.15 0.91 0.9 0.05 20 1.13
OREAS-16a 2014-2024 345 0.03 1.81 1.81 0.06 8 2.32
G908-3 2014-2018 1302 0.9 1.04 1.03 0.05 10 0.77
G307-6 2013-2014 304 -2.34 1.04 1.07 0.05 2 0.66
G300-9 2013-2021 783 -1.04 1.51 1.53 0.06 11 1.4
G911-4 2013-2024 288 -0.44 2.42 2.43 0.09 7 2.43
G910-7 2013-2015 1100 -1.25 0.5 0.51 0.03 7 0.64
OREAS-66a 2014-2018 445 -0.01 1.24 1.24 0.05 4 0.9
GLG914-4 2015-2021 766 3.32 0.38 0.37 0.02 11 1.44
G910-3 2013-2024 156 -3.09 3.9 4.02 0.17 7 4.49
G308-4 2013-2021 14 -4.97 6.43 6.77 0.29 1 7.14
G302-7 2014-2014 1 8.88 2.33 2.14 0.09 0 0
OREAS-251 2015-2016 115 2.81 0.52 0.5 0.02 19 16.52
OREAS-203 2015-2016 85 1.53 0.88 0.87 0.03 1 1.18
G305-2 2014-2014 6 -1.56 0.32 0.32 0.02 0 0
G305-4 2014-2014 9 -3.38 4.04 4.18 0.15 1 11.11
G310-6 2015-2024 814 -2.57 0.63 0.65 0.04 7 0.86
G316-2 2018-2024 82 -1.17 1.03 1.04 0.04 1 1.22
OREAS<br> 67a 2021-2021 3 2.62 2.3 2.24 0.1 0 0
OREAS-19a 2021-2021 4 5.83 5.81 5.49 0.1 2 50

Notes:

1. Au in ppm
2. EV = Expected Value
--- ---
3. SD = Standard Deviation
--- ---
Page 89
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Overall, the CRM results indicate good performance, consistent with the expected values. All CRMs were initially reviewed for overall performance using z-score plots, which included all CRM series (Geostats and OREAS). Occasional mislabeling was observed. As shown in Figure 11-3, there appears to be a reduction in the number of outliers and an improvement in results from 2023 onwards, with a slight negative bias observed in the CRMs during 2024. The number of outliers, however, does not significantly affect the overall assessment of the CRMs.

Figure 11-3: Tasiast CRM Z-Score

SLR selected three CRMs for an in-depth review, representing the low, average, and high gold grade ranges. These were selected based on their sample quantity and extended periods of use.

Figure 11-4 to Figure 11-6 present the results for 1,804 samples of G912-7, 345 samples of OREAS-16a, and 156 samples of G910-3. The CRM G912-7 exhibits an acceptable bias of -0.75%, with 10 samples falling outside the mean ±3SD threshold. Four of these samples are likely mislabeled, with three showing values near 2.9 g/t Au and one at 0.18 g/t Au. The CRM OREAS-16a demonstrates a bias of 0.0%, with eight failures, all close to the threshold. The CRM G910-3 shows good scatter levels with a negative bias of -3.1%, including seven failures slightly below the lower limit and one potential mislabeling at 2.57 g/t Au.

Page 90
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 11-4: Control chart of CRM G912-7 forgold in ALS: 2015–2024

Figure 11-5: Control chart of CRM OREAS-16afor gold in ALS: 201 –2024

Page 91
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 11-6: Control chart of CRM G910-3 forgold in ALS: 2014–2024

SLR recommended continuous monitoring of the CRM data to ensure early detection of potential emerging biases that may require re-analysis, to promptly identify and rectify any biases that could affect the reliability of the results, and to check and correct any mislabels in the dataset.

Blank Material

The regular submission of blank material is used to assess contamination, either during sample preparation or analyses, and to identify sample numbering errors. Coarse blanks consisted of barren rock. Each blank sample was placed into a plastic sample bag and assigned a unique identification number. These blanks were inserted into the sample stream the and underwent the same sample preparation and analytical procedures as the rest of the drill samples.

A total of 12,336 samples were submitted to ALS Tasiast between 2013 and 2024. These samples originate from different deposit areas, as shown in Table 11-5. Blank assay results exceeding 10 times the detection limit (0.005 g/t Au) are classified as failures. A review of the coarse blanks submitted to ALS Tasiast indicates no significant contamination during the preparation stage. A total of 40 blank samples, or 0.3% of the total samples, exceeded the acceptable limit. Among these, the highest gold grades were reported in 2014 but did not exceed 0.5 g/t Au (see Figure 11-7).

Page 92
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 11-5**:Insertion of blank samples by deposit: 2013–2024**

PROJECT
Year Elgaicha Imke Ndaouase Tasouth Teme Grand <br><br> Total
2013 647 246 9 143 127 1,172
2014 696 186 - 1,172 1,083 3,137
2015 8 924 - 480 1,348 2,760
2016 946 - 268 - 1,214
2017 328 - - 2,023 - 2,351
2018 237 - - 188 - 425
2020 154 - - - - 154
2021 960 - - - - 960
2023 81 - - - - 81
2024 82 - - - - 82
Grand Total 4,139 1,356 9 4,274 2,558 12,336

Figure 11-7: 2013 - 2024 results of coarseblank samples in ALS

Page 93
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Conclusions and Recommendations

Based on the review of data spanning from 2013 to 2024, the conclusions and recommendations from SLR are as follows:

· No<br> significant contamination occurrences were identified during sample preparation at ALS Tasiast.<br> Review the highest grade samples to determine if they may be mislabeled and make the necessary<br> corrections in the database, always maintaining a record of the changes made.
· CRMs<br> demonstrated good performance, maintaining a bias within ±5% and control limits set<br> at ±3SD from the expected value. Only a few isolated mislabeling cases were observed.<br> Review and correct these samples in the database.
--- ---
· Reduce<br> the number of CRM types to three or four: one close to the cut-off grade, one or two close<br> to the average grade, and a high-grade CRM. This approach is sufficient to effectively monitor<br> laboratory performance and track potential emerging biases or systematic failures over extended<br> periods.
--- ---
· Implement<br> a duplicate sample program to enhance monitoring of grade variability during sampling, preparation,<br> and assaying.
--- ---
· Implement<br> a check assay program to a tertiary laboratory to validate the reproducibility of gold values<br> from the primary laboratory (ALS).
--- ---
· Based<br> on the Tasiast QA/QC program results, the overall precision and accuracy of the current gold<br> assays are acceptable and sufficient for inclusion in an MRE.
--- ---
11.6 Data and Sample Security
--- ---

Database

All drill hole and geological data at Tasiast have been collected and stored using a variety of software and systems. Limited information exists regarding the way the data was stored prior to Red Back, however, data analysis suggests that the data was collected using spreadsheets and then imported into the 3D software that was used at the time. During this process much of the information regarding assays, such as laboratories and methods used, was lost.

In 2007, Red Back implemented a Relational Database Management System called Fusion, which was developed by Century Systems and later sold to Datamine.

After Kinross acquired Red Back Mining in September 2010, Kinross continued using Fusion. In 2012, Kinross migrated the Tasiast System Architecture to the Central – Fusion Remote – Locals Model, which had already been implemented by Kinross globally. The Central Database (structure owner) was located in Toronto, Canada. The sites (Brazil, Chile, Tasiast, Russia) hosted in their local server the Remotes, which were the data owners. In Tasiast, Exploration and Grade Control shared the same Remote database. In 2014, Technical Services Tasiast separated Exploration and Grade Control data into two different databases: The exploration team continued to utilize the Fusion Remote architecture as outlined as in Figure 11-8b and the grade control team went back to utilizing Central Database (which was used prior to 2012) architecture as outlined in Figure 11-8a, with the Central being located in Tasiast.

Page 94
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Source: Sims 2019.

Figure 11-8: Representation of different systemarchitectures for Fusion

Page 95
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

In January 2018, Kinross replaced Fusion with acQuire, another Relational Database Management System, based in structured query language (SQL). The Exploration Fusion Remote Database was disconnected from the Central database in Toronto and both Fusion databases at Tasiast (Grade Control and Exploration) were migrated and combined into a single database in acQuire. Since acQuire has more robust business rules than Fusion, when there were conflicting data (e.g., orphan samples, two records in the assay table for the same interval and method), the conflicting records were not migrated.

Assay Database Rebuild

In October 2018, during a validation process of the assay records in acQuire, some issues that compromised the integrity of the data were encountered. The causes of the issues had different origins that had not been previously detected. Some of the issues found are listed below:

· Laboratory<br> reports used the wrong Lab Job number in the import file. Since this information was used<br> for QA/QC purposes, as explained in Section 12.2, the process could be jeopardized.
· Some<br> laboratories reported various samples using a different sample ID than the one in the database.<br> Previous database administrators had manually corrected the laboratory report to match the<br> sample ID in the database instead of requesting the laboratory to reissue the import file.<br> As many of the reports were some years old and it would be difficult to request the laboratory<br> to re-issue, the sample ID in the database was changed to match the laboratory report and<br> the re-import could be done properly using the original laboratory report.
--- ---
· A<br> few samples and assay results had never been imported into the database.
--- ---
· There<br> were some examples of incorrect gold values.
--- ---

These issues triggered the decision to completely rebuild the assay database.

The rebuild of the assay database was done by re-importing all the laboratory certificates that were available and then performing the QA/QC to pass or reject assays using the procedure described in the previous subsections. The re-import of certificates for holes in the West Branch area was completed in March 2019, then the reimport continued with the Piment and Prolongation areas, and finished with the northern satellite deposits. For records where no laboratory certificates were found, the data was migrated from the previous database using a qualifier to denote that the data was not imported from certificates during this phase.

Page 96
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Sample Storage

Sample pulps are returned from the laboratory in plastic vials or sealed paper envelopes, and these are stored in sealed containers at site. The majority of historical coarse reject samples were not stored, however, TMLSA has commenced storing selected mineralized coarse reject material. The remaining half of the drill core is securely stored in stacked wooden trays referenced by hole identification number and interval length. Some core intervals have been totally sampled for metallurgical or check (umpire) sampling.

Sample Security

Following TMLSA’s acquisition of the Tasiast Mine in September 2010, all drill samples collected are under direct supervision of TMLSA staff, starting at the drill rig, and remain within the custody of staff until they are delivered to ALS Tasiast or placed on contracted trucks for delivery to the Mali laboratory. Samples, including duplicates, blanks, and CRMs, are delivered daily from the drill rig to a secure storage area within the fenced Tasiast core facility.

Chain of custody procedures consist of filling out sample submittal forms that are sent to the laboratory with sample shipments to make certain that all samples are received by the laboratory.

11.7 Comment on Sample Collection, Preparation, Analysis, and Security

The QP considers the sampling methods acceptable, consistent with industry standards, and suitable for Mineral Resource and Reserve estimation as well as mine planning. This conclusion is based on the following key observations:

· Sampling Protocols: Data were collected in accordance with industry-standard procedures, ensuring<br> reliable sample integrity.
· Density/Specific Gravity: Density/specific gravity determinations followed established methods, with sufficient<br> data to support tonnage interpolations for both mineralized zones and waste.
--- ---
· Sample Preparation: Both RC and core samples were prepared using industry-standard procedures<br> suitable for coarse gold deposits hosted in greenstone belts and banded iron formations.
--- ---
· QA/QC Program: The current program included CRM and blank samples, which demonstrated no significant<br> contamination during sample preparation at ALS Tasiast. CRMs performed within a ±5%<br> bias, with an acceptable number of outliers, although some mislabeled samples require verification.<br> In the QP’s opinion, the QA/QC program as designed and implemented by TMLSA and Kinross<br> is adequate and the assay results within the database are suitable for use in a Mineral Resource<br> estimate.The QP recommends enhancing the program by including duplicates and implementing<br> external checks to improve grade variability monitoring and validate the reproducibility<br> of gold assays from the primary laboratory.
--- ---
Page 97
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
· Sample Storage and Security: Samples were securely stored or monitored prior to dispatch, with<br> chain-of-custody forms ensuring proper tracking and receipt at the laboratory.
--- ---
· Based<br> on these findings, the QP concludes that the sample collection, preparation, and analysis<br> are robust, reliable, and appropriate for Mineral Resource and Reserve estimation.
--- ---
Page 98
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
12. Data Verification
--- ---

Numerous verification checks have been performed on data collected from the Complex, either in support of technical reports, or as part of the Tasiast Mine feasibility study. The QP has reviewed this work and in many cases, contributed to or overseen, these verification activities.

12.1 Verification in Support of Technical Reports

This section summarizes the verification activities completed at the Complex by external consultants.

SRK (2003)

SRK (Guibal, 2003) reviewed the data available in 2003, as part of supporting documentation for the acquisition of Midas by Geomaque, and commented:

· Although<br> SRK was not involved in the selection and collection of the check samples, the documentation<br> supplied by [Midas] which includes all the analytical results show that the general quality<br> of the sampling/assaying is acceptable and to industry standards.
· Although<br> the density data originates from a relatively small number of drill holes, there are indications<br> that a single tonnage factor for oxide and for primary, as used in the resource estimates,<br> is a simplification of the true variation with depth.
--- ---

ACA Howe (2003 and 2007)

ACA Howe inspected Defiance’s sample preparation facility and considered the facility to be reasonably well equipped and maintained, in accordance with acceptable industry standards (Leroux and Puritch, 2003; Leroux et al., 2007).

Midas collected a total of 429 pulp samples of known NLSD drilled mineralized zones in early 2003 (Hyde, 2003). Midas inserted blanks and standards and submitted this sample batch to Genalysis. The Genalysis results compared well with the NLSD assays, and the standards and blanks inserted by Midas assayed within acceptable limits.

A comparison of RC and core duplicate samples indicated no major bias across all grade ranges. ACA Howe considered that the degree of scatter shown in graphed data was acceptable for resource estimation purposes. No bias occurred towards the higher grade original or repeat assays.

A total of 134 one-metre interval RC samples from six of Defiance’s RC drill holes and 27 core pulp samples from two Defiance core drill holes were submitted by ACA Howe to ALS Chemex Laboratories in Mississauga, Ontario for check analysis.

Page 99
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Upon review of the results, ACA Howe was of the opinion that its independent check assay results confirmed the presence of gold mineralization at Tasiast.

SNC-Lavalin (2004)

Defiance selected mineralized intersections from 30 RC holes covering the four mineralized areas of the Piment deposit, which were sent to Canada for metallurgical test work. SNC-Lavalin (SNC) (Demers et al., 2004) reviewed the drill hole information on the geological sections prepared by ACA Howe and combined the sampled intersections of several drill holes to obtain nine samples considered to be representative for the various mineralized zones and their high and low gold grades. These samples were sent to SGS Lakefield in Ontario, Canada; an ISO/IEC 17025 accredited laboratory for assay. The comparison of the assay results of the initial samples and those from Lakefield was acceptable and showed a reasonable correlation.

SNC representatives collected eight samples of RC drilling chips that had previously been assayed by SGS Analab. These samples were sent to Lakefield for assay. Results showed that gold was present in the indicated mineralized zones even though the correlation was rather erratic due to the statistically low number of samples.

Red Back (2008-2010)

Red Back conducted an analysis of the available, historical QA/QC data from Defiance and Rio Narcea as part of the February 2008 resource update comparing all historical data with data generated by Red Back as at February 2008. The following conclusions were noted (Stuart, 2008):

· Globally,<br> all the laboratories used to compile the Tasiast resource database have reported the ore<br> grade standards well. On average, 85% of the six +1.5 g/t Au internationally<br> accredited CRM samples submitted reported to within an accuracy of ±10%. The historical<br> pre-Red Back database reported 86%. The Red Back database reported 84%.
· A<br> minor negative bias was repeated in each of the standards tested at each of the laboratories.<br> The negative direction of the standards bias, however, results in a degree of conservatism<br> in the assays reported.
--- ---
· The<br> less than 1.0 g/t Au standards did not perform as well, with a range of 67% to 75% of the<br> standards submitted reporting to within ±10%. The poorer precision and accuracy of<br> the QA/QC data below 1.0 g/t Au is evident across the whole of the resource timeframe.
--- ---
· Both<br> routine Red Back and pre-Red Back blank submissions performed well, exhibiting only a minor<br> low level <50 ppb Au cross-contamination. Evidence suggests a component of poor blank<br> selection may have contributed to the Red Back higher bias and was noted for further attention.
--- ---
Page 100
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
· The<br> total operational precision (TOP) achieved by Red Back, demonstrated by a percent Median<br> Absolute Half Difference (%MAHD) = ±14% of resource grade assays >0.2 g/t Au, is<br> generally within acceptable limits of a coarse gold deposit, such as Tasiast. The coarse<br> gold nature of the deposit is apparent within the range of errors expressed by the 90th percentile<br> Absolute Half Difference (AHD) = ±58%.
--- ---
· While<br> analyzing the historical pre-Red Back duplicate data, it was observed that the historical<br> resource data reported similar “nuggetty” duplicate assaying, closely comparative<br> to the Red Back data with %MAHD = ±14% and a P90 AHD = ±50% >0.2<br> g/t Au. The datasets have equivalent coarse gold features and equivalent assaying precision.
--- ---
· The<br> imprecision consequent of coarse gold is evident across the entire Tasiast grade profile<br> from 0.2 g/t Au to 10 g/t Au. Clustering of “nuggetty assaying” is often observed<br> in mesothermal greenschist facies, epigenetic, structurally controlled deposits at the high-grade<br> end of the profile due to the coarse gold being hosted dominantly in the quartz vein materials,<br> the gold being finer, and closer to sulphide lattice within the disseminated selvages.
--- ---
· Red<br> Back considered the extent of the assay data included in the Tasiast resource data to be<br> accurate and precise to within the inherent, natural coarse grade variation observed in the<br> grade profile of this structurally controlled, sub- amphibolite, BIM-hosted style of gold<br> mineralization.
--- ---

Review of the blank, duplicate, and CRM submissions in 2009 and 2010 (Stuart, 2009; Stuart, 2010) indicated no significant errors or biases in the analytical data. Prior to late 2009 the majority of the field duplicate analyses completed were from non-Greenschist mineralization styles, e.g., Piment iron-formation and West Branch footwall. A total of 16,907 (2009) and 15,929 (2010) QA/QC samples were blindly inserted as part of the routine sample preparation and were submitted for analysis. Red Back concluded that the QA/QC data reported was of industry accepted standards and the assay data was considered reliable for inclusion in the December 2008, 2009, and 2010 resource estimations.

TMSLA (2017)

Verification tests performed on the data at Tasiast by TMSLA included:

1. Collar coordinates, by comparing the data<br> in the database with the data obtained by the surveyor.
2. Downhole survey, by plotting the holes in<br> 3D software and checking for any anomalies in the deviations of the holes. Many different<br> instruments for measuring hole deviation in downhole surveying were used at Tasiast. As a<br> result, a ranking system of the instrument was implemented, giving priority to the instrument<br> with better precision when multiple instruments were used to survey the same hole. Instruments<br> giving the more accurate reading preceded all other surveys.
--- ---
Page 101
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
3. Lithology, alteration, mineralization, by<br> comparing the data in the database with the data captured in the logs and correcting a few<br> cases of gaps and/or overlaps.
--- ---
4. Assays, by comparing 10% of the results<br> in the database to the results in the original certificates provided by the laboratories.
--- ---
5. The validation process was completed by<br> importing the data into Micromine (mining software) and Leapfrog Geo (Leapfrog) to visually<br> check the validity of the data and to generate a report.
--- ---
12.2 Comment on Data Verification
--- ---

The process of data verification for the Complex has been performed by TMLSA, Red Back, and personnel of precursor companies, and external consultancies contracted by those companies.

The QP has reviewed the reports and is of the opinion that the data verification programs for the Complex adequately support the geological interpretations, the analytical and database quality, and comply with industry standards, and therefore support the use of the data in Mineral Resource and Mineral Reserve estimation.

Data used to support Mineral Resource and Mineral Reserve estimates have been subjected to validation, using built-in software program triggers that automatically check data for a range of data entry errors. Verification checks on surveys, collar coordinates, lithology, and assay data have also been conducted. The checks are appropriate and consistent with industry standards.

Ongoing sample preparation and analytical work is recommended by the QP to obtain more acceptable precision from the duplicate samples.

Page 102
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
13. Mineral Processing and Metallurgical Testing
--- ---
13.1 Mineralogy
--- ---

The Tasiast mineralization is free-milling and amenable to gold extraction by simple gravity and cyanide leaching. The existing mill has been operating since 2008, initially treating oxide BIM hosted ore yielding a typical gold recovery of 93%. Gold recovery from fresh ore, which forms an increasing portion of the mill feed since 2010, varies between 91% and 95%. A proportion of the gold is coarse and responds well to gravity concentration. Gold mineralization is associated with structurally controlled faults and shears, quartz-veining, and silica-flooding. Gold grains observed in the exploration core holes are seen in isolated grains in quartz veins and are closely associated with pyrrhotite. The mineralization has relatively low levels of sulphides, approximately 1% to 5% S, predominantly represented by pyrrhotite and to lesser extents pyrite, arsenopyrite, and chalcopyrite. Other metal contents are low, such as silver at approximately 1 ppm to 2 ppm, copper at approximately 100 ppm, arsenic at approximately 10 ppm, and very low levels of mercury at less than 0.3 ppm.

13.2 Metallurgical Test Work

The bulk of the metallurgical test work has been done to evaluate the optimum process for the West Branch ore which has become the major source to the processing plant.

Four major metallurgical sampling campaigns were conducted on the West Branch mineralized zone as follows:

· Campaign<br> 1: Ammtec Pty. Ltd. (Ammtec) (2010)
· Campaign<br> 2: SGS Canada Inc. (2012)
--- ---
· Campaign<br> 3: SGS Canada Inc., additional boreholes to test for variability (2014)
--- ---
· Campaign<br> 4: KHD Humboldt Wedag (KDH) and JKTech Pty. Ltd. (JKTech) (2012), high pressure grinding<br> roll (HPGR) and comminution tests
--- ---

A program of waste rock sampling and characterization was also undertaken with core samples selected to represent all rock lithologies and depths.

In 2024, test work was carried out on composites collected from drill holes of the satellite pits Piment and Fennec, to assess their metallurgical performance with the existing flowsheet.

Page 103
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Test Work Program

Test work was conducted by multiple laboratories and the results from the different laboratories were comparable.

The information generated in the test work programs was sufficient for:

· Preparation<br> of ore characterization
· Process<br> selection
--- ---
· Process<br> Flowsheet development
--- ---
· Production<br> scheduling
--- ---
· Expenditure<br> estimates
--- ---

Summary of Comminution Characteristics

Work was carried out by Ammtec, SGS, and JKTech to determine the comminution characteristics primarily of West Branch, as well as Piment samples. Tests were performed to assess the variation in comminution parameters and confirm grinding energy requirements for the deeper ore. Sample locations are shown in Figure 13-1.

All of the samples were checked for their correct lithologies and split into separate lithologies for analysis. The mine plan by lithology is shown in Table 13-1 and comminution parameters obtained from laboratory test work are in Table 13-2. The majority of the ore will be from the fresh granodiorite intrusives (GDI) and fresh banded iron (BIM) lithologies.

Page 104
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table13-1: Mill feed plan by lithology

2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Lithology (kt) (kt) (kt) (kt) (kt) (kt) (kt) (kt) (kt) (kt) (kt)
Oxides
Trans.
BIM 79 775 31 1,637 3,059
GDI 575 28 1,762 4,757 2,645 440
Fresh SVC 623 942 14
FVC 13 1,514
SGW 68 361 157 61
Stockpiles 8,154 7,315 5,714 3,982 4,308 3,687 8,760 8,784 8,760 8,760 8,360
CIL Plant 8,808 8,808 8,760 8,784 8,760 8,760 8,760 8,784 8,760 8,760 8,360
Page 105
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 13-1: Comminution sample locations

Page 106
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 13-2: Comminutioncharacteristics by lithology

**** JK Parameters2 Work Indices (kWh/t)
**** Lithology SG ta a x b DWI CWI RWI BWI AI
WB BIM Fr3 3.27 0.26 32.9 10.0 - - - -
WB FVC Fr 2.68 0.25 26.0 10.4 15.9 25.3 17.1 0.713
75th Percentile WB GDI Fr4 2.90 0.25 27.6 10.4 17.6 17.2 13.9 0.450
WB SVC Fr 2.85 0.30 32.4 8.8 16.4 19.2 14.8 0.444
PIM SVC Fr 2.98 0.31 33.3 8.4 14.6 19.5 15.5 0.265
PIM BIM Fr 3.31 0.28 34.1 9.6 14.6 19.2 13.3 0.379
WB BIM Fr 3.19 0.30 37.1 8.8 - - - -
WB FVC Fr 2.68 0.28 29.0 9.4 14.3 23.4 15.9 0.587
Average WB GDI Fr 2.86 0.27 29.8 9.7 15.4 15.8 13.4 0.376
WB SVC Fr 2.82 0.33 35.7 8.1 14.2 18.7 14.4 0.373
PIM SVC Fr 2.90 0.33 36.4 8.0 14.6 19.5 15.5 0.265
PIM BIM Fr 3.12 0.30 35.2 8.9 12.7 18.0 12.7 0.312

Notes:

1. a x b and ta are parameters in the JKTech Drop Weight Test model.
2. BIM lithology combines samples previously tested as BIM_FW (footwall)<br> and BIM_HW (hanging wall).
--- ---
3. Granodiorite intrusives (GDI) were previously referred to as the greenschist<br> (GST) lithology.
--- ---
4. SG = Specific gravity.
--- ---
5. DWI = Drop Weight Index.
--- ---
6. CWI = Crushing Work Index.
--- ---
7. RWI = Rod Mill Work Index.
--- ---
8. BWI = Bond Work Index.
--- ---
9. AI = Abrasion Index.
--- ---

The semi-autogenous grinding (SAG) mill test work indicates that the ore becomes progressively harder at depth. A typical relationship indicating the trend of increasing SAG mill grinding energy (SAG power index [SPI]) requirement with depth is shown in Figure 13-2.

Page 107
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 13-2: Variation of SAG milling powerindex with vertical depth

The current mine plan does not include mining to below a depth of 500 m, so the SAG energy requirement increase is very low.

Cyanidation Test Work – West Branch

Metallurgical Test Work Parameters

Extensive metallurgical testing was completed on West Branch samples, twinned hole samples, and deeper level variability samples. In general, test work indicated that the ore was amenable to gravity recovery and cyanide leaching, resulting in selection of a flowsheet like that of the existing plant. Some of the key parameters that resulted from the test work are:

· Grind<br> size: 90 µm
· Gravity<br> recovery: variable, approximately 30% to 50% of gold in feed
--- ---
· Leach<br> retention: approximately 24 hours
--- ---
· Ore<br> is not preg-robbing
--- ---
· Cyanide<br> consumption: 0.7 kg/t
--- ---
Page 108
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Cyanide Concentrations and Grinding Test Work

The grinding test work results show that gold extraction increases with a finer grind size. Gold dissolution kinetics were enhanced at the finer 80% passing (P80) grind sizes of 90 µm and 75 µm. At the selected grind of 90 µm, test work indicates that most leaching is complete at approximately 24 hours, as shown in Figure 13-3. Historically, the operating plant has shown 18 hours to be the optimal leach time, which was selected for design. The improved kinetics relative to the test work are likely the result of grinding in process water containing cyanide recycled from the tailings thickener and gravity recovery circuit, which removes coarse slower leaching gold.

The cyanide addition rate has been optimized to a low addition rate. Test work results indicate that cyanide consumption rate as low as 0.5 g/L is possible. Operationally, a cyanide addition rate of 0.7 kg/t is used for CIL.

Figure 13-3: Gold recovery as a function ofgrind and leach retention

Summary of Tests and Recoveries – West Branch

A compilation of all the relevant tests done, limited to those samples within the currently defined resource, produced the recoveries shown in Figure 13-4.

Page 109
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 13-4: Gold grade vs. recovery relationship

The figure shows that all of the selected samples leached well, that oxygen enhancement improved leach rate, and that recoveries are between 84% and 94% at a grade of approximately two grams per tonne. The recoveries are predominantly above 86%, with a few exceptions that, from a metallurgical perspective, gives high confidence that all the sampled parts of the orebody are amenable to gravity and cyanidation. Comparative tests using oxygen (dissolved oxygen (DO) = 15 mg/L to 20 mg/L) vs. air (DO = 6 mg/L to mg/L) indicate that oxygen increases gold extraction in the range of 0.5% to 1.4%, depending on cyanide concentration.

The trend line made up of representative samples indicates a relationship between head grade and gold recovery, with higher recoveries achieved at higher gold head grades, as expected. The mathematical relationship developed was used to estimate recovery based on the ore grade obtained from the mine plan.

Metallurgical Test Work – Piment and Fennec

Test work was carried out by SGS Lakefield in 2024 for the Piment and Fennec satellite pits. Four composites were collected for each pit from full and half HQ core drilled by the Exploration team. The composites were collected with main lithology and alterations represented as well as zones that were expected to be metallurgically challenging to process.

Page 110
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

As Fennec is a different rock type (Greywacke) than West Branch and Piment, Bond ball mill work index (BWi) testing we completed at the end of 2024 for indication on comminution performance – the results were not yet available at the time of writing this report. Thickening test work is planned and expected to be completed in early 2025.

The cyanidation tests for Piment and Fennec were run with parameters similar to those in the plant’s current operation. The tests included gravity concentration, followed by cyanide leach via bottle roll of the gravity tails:

· At<br> a particle size of approximately 90 µm
· At<br> 250 ppm to 350 ppm free cyanide concentration maintained
--- ---
· 1.5<br> hours to 4.0 hours of pre-aeration at natural pH
--- ---
· 24<br> hours total leach
--- ---
· 0<br> g/t to 250 g/t of lead nitrate
--- ---

When comparing the averages of the Piment and Fennec tests to test work done at SGS on West Branch samples with similar parameters, the overall recoveries (gravity + leach) are similar, ranging from 94.8% to 95.7%. A summary of results is shown in Table 13-3.

A comparison of cyanidation test work results from Piment and Fennec bottle rolls and the 2022 West Branch tests are shown in Figure 13-5.

Page 111
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 13-3: Test work results (SGS 2022 andSGS 2024)

Conditions
Test Work Program Sample CN Test CN maintain (ppm) Grind Size P80, (µm) Pb(NO3)2 dose, (g/t) *Pre- aeration time (hr) Grav Sep Grav + CIL Direct  SGS Modelled
2022<br> SGS – West Branch mine composites C.<br> 1 & 2 CN1 350 94 0 0 43.7 93.1 3.12 3.31
C. 1 & 2 CN2 350 94 100 4 43.7 93.1 3.12 3.31
C.<br> 1 & 2 CN3 350 94 250 4 43.7 93.2 3.12 3.31
C. 3 CN4 350 90 0 0 40.0 96.6 2.30 1.99
C. 3 CN5 350 90 100 4 40.0 96.2 2.30 1.99
C.<br> 3 CN6 350 90 250 4 40.0 97.1 2.30 1.99
C. 5 & 6 CN7 350 94 0 0 30.2 93.8 2.89 2.41
C. 5 & 6 CN8 350 94 100 4 30.2 95.1 2.89 2.41
C.<br> 5 & 6 CN9 350 94 250 4 30.2 95.1 2.89 2.41
C. 10 CN10 350 89 0 0 39.9 94.6 3.31 2.91
C. 10 CN11 350 89 100 4 39.9 93.9 3.31 2.91
C.<br> 10 CN12 350 89 250 4 39.9 94.6 3.31 2.91
C. 7 & 8 CN13 350 91 0 0 29.3 95.4 4.02 3.92
C. 7 & 8 CN14 350 91 100 4 29.3 95.4 4.02 3.92
C.<br> 7 & 8 CN15 350 91 250 4 29.3 95.3 4.02 3.92
Average 350 92 117 3 36.6 94.8 3.13 2.91
2024 SGS –Piment drill hole composites<br> S.<br> 1 CN1 250 121 100 1.5 40.0 93.9 1.73 1.89
S. 1 CN3 250 90 100 1.5 40.0 95.5 1.73 1.89
S.<br> 1 CN13 250 90 0 1.5 40.0 95.6 1.73 1.89
S. 2 CN2 250 119 100 1.5 26.2 92.9 0.48 0.71
Page 112
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
Conditions
--- --- --- --- --- --- --- --- --- --- ---
Test Work Program Sample CN Test CN maintain (ppm) Grind Size P80, (µm) Pb(NO3)2 dose, (g/t) *Pre- aeration time (hr) Grav Sep Grav + CIL Direct  SGS Modelled
S.<br> 2 CN6 250 90 100 1.5 26.2 96.3 0.48 0.71
S.<br> 2 CN14 250 88 0 1.5 26.2 93.2 0.48 0.71
S. 3 CN5 250 129 100 1.5 28.0 92.6 0.93 1.68
S. 3 CN7 250 101 100 1.5 28.0 95.1 0.93 1.68
S.<br> 3 CN15 250 87 100 1.5 28.0 91.9 0.93 1.68
S. 4 CN4 250 77 100 1.5 20.1 95.8 2.05 3.10
S. 4 CN8 250 73 100 1.5 20.1 96.3 2.05 3.10
S.<br> 4 CN16 250 83 100 1.5 20.1 95.9 2.05 3.10
Average of finer grind tests 250 88 75 2 28.6 95.0 1.30 1.85
2024<br> SGS –Fennec drill hole composites S.<br> 1 CN1 250 94 100 1.5 22.3 95.7 0.73 0.80
S.<br> 2 CN2 250 91 100 1.5 22.1 95.4 1.75 1.91
S.<br> 3 CN5 250 93 100 1.5 6.6 95.6 4.86 3.53
S.<br> 4 CN4 250 89 100 1.5 15.0 96.0 9.45 8.99
Average 250 92 100 2 16.5 95.7 4.20 3.81

Notes:

C. = Composite sample; S. = Sample

Page 113
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 13-5: Grade-recovery comparison of Piment,Fennec, and West Branch test work

Summary of Thickening Characteristics – West Branch

Ammtec performed flocculent screening tests on ground composite samples of West Branch ore using seawater obtained near Perth. Magnafloc MF336 flocculent was selected for subsequent settling tests to optimize flocculent consumption and develop thickener sizing criteria.

Thickening characteristics of deeper level variability samples were determined through Outotec test work in 2010, FLSmidth test work in 2011, SGS Lakefield test work in 2013, and FLSmidth test work in 2013. Outotec investigated the dynamic settling characteristics and determined the thickener sizing criteria. In 2011, FLSmidth conducted sedimentation and rheology testing. SGS conducted dynamic settling tests on a number of composite samples that had been prepared for leaching test work in 2012 and 2013. Based on test work a unit rate of 0.45 m^2^/t/d was selected for design.

Acid Rock Drainage Characteristics of West Branch Samples

Acid rock drainage (ARD) testing was completed on leach residue generated from the GDI samples in the Ammtec 2011 follow-up test work program to simulate plant tailings. Results indicated that the leach residues do not have potential acid generating characteristics, however, have significant acid consuming capacity (likely due to the carbonate content of each ore composite).

Page 114
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

In 2011, a waste rock material characterization program was conducted by URS Scott Wilson and supported by Kinross Tasiast and SRK Consulting. During the study, 154 samples were collected from exploration drilling core of different lithologies to assess the ARD potential. Study results showed that waste rock typically exhibits a significant residual neutralization potential for all the lithologies investigated.

The study results, coupled with the favorable arid climate, lack of surface water, and very limited groundwater (no viable groundwater aquifer exists), as well as a Materials Management Plan indicate low potential for ARD or metal leaching to develop.

Page 115
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
14. Mineral Resource Estimate
--- ---
14.1 Summary
--- ---

The previous Technical Report (Kinross, 2020) for the property included resource models for West Branch, Piment, and Prolongation deposits, with an effective date of October 31, 2019. An updated MRE was prepared by the Kinross team in October to December 2021 for Piment and Prolongation and November 2022 to February 2023 for West Branch, using available drill hole data as of July 26, 2021. An additional small deposit, Fennec, was estimated in 2020, however, as it’s contribution to the total Mineral Resources is so small, it is not discussed in detail in this section. There was no additional exploration drilling completed since the 2019 update and no significant changes to the exploration database. The update was prompted by several structural studies on mineralization control, advances in mining, and the need to use more robust modelling techniques.

Leapfrog Geo software (version 2021.1.3 and 2022.2.1) was used to construct the geological model and Mineral Resource domains. Datamine Studio software (version 1.7.1), Leapfrog Geo, and Snowden Supervisor software were used in the preparation of assay data for geostatistical analysis, block model construction, and gold grade estimation.

The MRE is defined by five mineralized domains for West Branch and twelve mineralized domains for Piment and Prolongation. Each domain comprises an outer shear zone or mineralized envelope modelled as tabular veins, and an inner mineralized sub-domain modelled as an indicator interpolant. The mineralized zones were modelled using a grade threshold of 0.15 g/t Au as a guide, with logging data used in the absence of mineralization.

Samples were composited to two metres within each domain with capping done, per domain, thereafter. Capped values were estimated into sub-blocked models using a three-pass ordinary kriging (OK) approach for the mineralized zones and inverse distance squared (ID^2^) for the waste zone. The model was validated using a combination of methods including visual comparison of block estimates and composites, swath plots and change-of-support checks, using the nearest neighbour (NN) de-clustered distribution, as well as visual and statistical validation against the short-term model estimated using grade-control data. An external audit was conducted on the Mineral Resources for West Branch, Piment, and Prolongation in 2024 by SLR.

Page 116
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards for Mineral Resources and Mineral Reserves (CIM (2014) definitions) were used for Mineral Resource classification. Classification of Mineral Resources considered the confidence in geological continuity, drill hole spacing, proximity to the current mining areas, and grade control drilling. Areas characterized by drill hole spacings of approximately 30 m define areas classified as Measured for West Branch, Piment, and Prolongation. Spacings of approximately 60 m to 70 m support areas classified as Indicated for West Branch and 70 m for Piment and Prolongation. For the Inferred classification, drill hole spacings of approximately 150 m were used for West Branch and 120 m for Piment and Prolongation.

Mineral Resources for the Tasiast Mine, including the West Branch, Piment, Prolongation, and Fennec deposits are presented in Table 14-1.

Page 117
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 14-1: Tasiast Mineral Resource estimateas at December 31, 2024

Deposit Open Pit Underground Stockpiles Combined
Class Tonnage<br>  (kt) Grade <br> (g/t Au) Contained<br> Gold <br> (koz) Tonnage<br>  (kt) Grade <br> (g/t Au) Contained<br> Gold <br> (koz) Tonnage<br>  (kt) Grade <br> (g/t Au) Contained<br> Gold <br> (koz) Tonnage<br>  (kt) Grade <br> (g/t Au) Contained<br> Gold <br> (koz)
West Branch
Measured 1,181 0.75 28 13,339 0.51 220 14,520 0.53 248
Indicated 43,584 1.09 1,528 43,584 1.09 1,528
Meas + Ind 44,765 1.08 1,556 13,339 0.51 220 58,104 0.95 1,776
Inferred 3,462 2.17 242 13,825 2.52 1,119 17,288 2.45 1,360
Piment
Measured 4,668 0.77 116 33 0.60 1 4,702 0.77 117
Indicated 7,423 1.17 280 7,423 1.17 280
Meas + Ind 12,092 1.02 396 33 0.60 1 12,125 1.02 396
Inferred 432 1.30 18 2,769 2.57 228 3,202 2.39 247
Prolongation
Measured 2,073 1.69 113 2,073 1.69 113
Indicated 1,136 1.33 48 1,136 1.33 48
Meas + Ind 3,210 1.56 161 3,210 1.56 161
Inferred 190 1.16 7 190 1.16 7
Fennec
Measured
Indicated 1,112 0.88 32 1,112 0.88 32
Meas + Ind 1,112 0.88 32 1,112 0.88 32
Inferred 367 1.50 18 367 1.50 18
Page 118
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
Deposit Open Pit Underground Stockpiles Combined
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Class Tonnage<br>  (kt) Grade <br> (g/t Au) Contained<br> Gold <br> (koz) Tonnage<br>  (kt) Grade <br> (g/t Au) Contained<br> Gold <br> (koz) Tonnage<br>  (kt) Grade <br> (g/t Au) Contained<br> Gold <br> (koz) Tonnage<br>  (kt) Grade <br> (g/t Au) Contained<br> Gold <br> (koz)
Combined Total
Measured 7,923 1.01 257 13,373 0.51 221 21,296 0.70 478
Indicated 53,255 1.10 1,887 53,255 1.10 1,887
Meas + Ind 61,178 1.09 2,144 13,373 0.51 221 74,550 0.99 2,365
Inferred 4,452 1.99 284 16,595 2.53 1,347 21,047 2.41 1,632

Notes:

1. CIM<br> (2014) Definitions were followed for Mineral Resources.
2. Mineral<br> Resources are estimated using a long-term gold price of US$2,000 per ounce.
3. Open<br> pit Mineral Resources are constrained within an optimized pit shell and reported to cut-off<br> grades ranging from 0.39 g/t Au to 0.50 g/t Au.
4. Underground<br> Mineral Resources are constrained within resource panels below the optimized pit shell which<br> consider a minimum thickness of 2.5 m and a cut-off grade of 1.8 g/t Au. At West Branch,<br> crown pillar resource panels are factored to represent a 100% extraction limit.
5. Bulk<br> density was assigned considering oxidation and lithology.
6. Mineral<br> Resources are exclusive of Mineral Reserves.
7. Mineral<br> Resources that are not Mineral Reserves do not have demonstrated economic viability.
8. Numbers<br> may not add due to rounding.
Page 119
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
14.2 Comparison to Previous Estimate
--- ---

Year over year changes to the exclusive MRE are presented in Table 14-2. The principal reasons for the year over year changes can be attributed to:

1. Reduction in Measured gold ounces due to<br> the use of a lower reserve cut-off grade which has converted a portion of the Resource into<br> Reserve.
2. Increase in Indicated and Inferred ounces<br> due to a slight increase in resource shell size due to an increase in the resource gold price<br> (US$2,000 vs. US$1,700).
--- ---

Differences due to changes in the estimation approach (2019 vs. 2021/2022) are captured in Table 14-3.

Page 120
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 14-2: Year over year changes to the MineralResources

Opening Balance (EOY 2023) Production Depletion Geology Change Engineering Change Closing Balance (EOY 2024)
Tonnage Grade Ounces Tonnage Grade Ounces Tonnage Grade Ounces Tonnage Grade Ounces Tonnage Grade Ounces
Classification (kt) (g/t Au) (koz) (kt) (g/t Au) (koz) (kt) (g/t Au) (koz) (kt) (g/t Au) (koz) (kt) (g/t Au) (koz)
Measured 9,615.1 0.92 284.0 (434.5 ) 0.5 (7.4 ) 5.0 2.8 0.4 (1,262.9 ) 0.5 (19.7 ) 7,922.7 1.01 257.3
Indicated 48,936.3 1.05 1,646.0 (1,970.4 ) 0.6 (35.4 ) (486.0 ) 0.5 (8.2 ) 6,775.0 1.3 284.7 53,255.0 1.10 1,887.1
Measured (stockpile) - - - 13,372.7 0.5 220.5 - - - - - 13,372.7 0.51 220.5
Meas + Ind 58,551.4 1.03 1,930.0 10,967.9 0.5 177.7 (481.0 ) 0.5 (7.7 ) 5,512.1 1.5 265.0 74,550.4 0.99 2,364.9
Inferred 19,551.0 2.39 1,504.1 - - - - - - 1,495.5 2.7 127.7 21,046.5 2.41 1,631.8

Notes:

1. Engineering change includes changes to the cut-off grade and pit designs.
Page 121
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

When originally developed, the block models supporting the updated MREs at West Branch, Piment, and Prolongation were compared to the previous (2019) work. Changes to Mineral Resources were mainly attributed to the improved modelling methodology resulting in more constrained mineralized domains compared to the previous model. This change allowed for the preservation of more mineralized material, an increase of the reported tonnage and prevented the high-grade intersections affecting the larger volumes and creating the clusters of disseminated high-grade.

Table 14-3 presents a comparison between the current MRE and the 2019 MRE for West Branch and Piment and Prolongation, with both models upscaled to the same block support and the same representative areas selected. The area within the 2022 final design pit shell was selected for West Branch and the area within the optimized resource shell was selected for Piment and Prolongation. The material already mined out was excluded from the comparison.

The updated MRE shows a 9% increase in total tonnage, a 3% decrease in grade, and a 5% increase in total metal for West Branch. Similarly, for Piment and Prolongation, the updated MRE shows a 13% increase in total tonnage, a 7% decrease in grade, and a 5% increase in total metal. The changes are mainly attributed to the update to the modelling methodology resulting in more constrained mineralized domains compared to the previous model. This change allowed for the preservation of more mineralized material, an increase of the reported tonnage, and prevented the high-grade intersections affecting the larger volumes and creating the clusters of disseminated high-grade.

Table 14-3: Comparison between the currentand previous MRE

Deposit Classification Model Year Tonnage(kt) Grade(g/t Au) Gold Ounces(koz)
West Branch Measured<br> + Indicated 2019 46,538 2.16 3,239
2022 50,593 2.10 3,416
Difference 9 % -3 % 5 %
Piment<br> and Prolongation Measured<br> + Indicated 2020 21,144 1.74 1,186
2021 23,904 1.63 1,249
Difference 13 % -7 % 5 %

Notes:

1. The<br> cut-off-grade of 0.70 g/t Au was applied.
2. This<br> table does not represent Mineral Resources and is only for comparative purposes.
Page 122
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
14.3 Mineral Resource Cut-off Grades
--- ---

Assumptions and inputs into the cut-off grade calculations for open pit (OP) and underground (UG) gold mining at Tasiast are presented in Table 14-4.

Table 14-4: Cut-off grade inputs and assumptions

Inputs Units OP UG
Resource Metal Price USD/oz 2,000 2,000
Payable Metal % 99.95% 99.95%
Treatment and Refining Charges USD/oz 5.47 10.3
Reclamation Cost USD/oz 11.06
Royalty % 8.72% 8.2%
Average Head Grade g/t 1.04 2.5
Processing Recovery % 92.8 93.9
Mining Cost USD/t mined 3.38<br> – 3.42 47.6
Rehandle Cost USD/t milled 0.91
Haulage to Mill USD/t milled 0<br> – 3.01 0
Processing Cost USD/t milled 15.61<br> – 15.79 14.6
G&A Cost USD/t milled 8.23 13.4
Mining Sustaining Capital USD/t mined 0.24<br> – 0.33
Processing Sustaining Capital USD/t milled 1.48<br> – 1.55
Cut-off Grade g/t<br> Au 0.4 – 0.5 1.8

Notes:

1. Ranges<br> in OP Resource inputs due to differences in main and satellite pit treatment.
2. OP<br> mining cost includes base cost and incremental bench cost (increasing at depth).
Page 123
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
14.4 Resource Database
--- ---

The combined West Branch, Piment, and Prolongation exploration database is constrained between Y>68,000 and Y<80,000 in the local mine grid. The overall database includes 7,236 exploration drill holes with a total length of 1,078,840 m. This includes 601 diamond holes, 6,424 RC holes, and 211 RC pre-collar (diamond tail) holes. The database contains 787,976 assayed gold intervals with a total length of 850,075 m.

14.5 Geological Interpretation

Mineralized Domains

The MRE is defined by five mineralized domains for West Branch and twelve mineralized domains for Piment and Prolongation, each comprising an outer shear zone/mineralized envelope modelled as tabular veins, and an inner mineralized sub-domain modelled as an indicator interpolant. The mineralized envelopes modelled broad zones of potential mineralization and did not apply additional constraints on the amount of internal dilution. The mineralized sub-domains were modelled within the envelopes to avoid excessive dilution and further refine each domain. These domains were interpolated along the structural trends consistent with the orientation of the respective envelopes, following the gentle south plunge. Smaller domains supported by two or fewer boreholes were removed from the final domains for West Branch. For Piment and Prolongation, an additional disseminated domain was created to constrain many discontinuous lenses.

The mineralized zones were modelled using a grade threshold of 0.15 g/t gold as a guide, with lithology, mineralization, and alteration logging used in the absence of mineralization. The grade modelling threshold was selected based on the apparent inflection of the mineralized population on the gold probability plot (Figure 14-1).

Final mineralized domains are presented in Table 14-5 for West Branch and Table 14-6 for Piment and Prolongation. Plan and cross-sectional views of the mineralized zones and envelopes are presented for each deposit in Figure 14-2 to Figure 14-4.

Page 124
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 14-5: Mineralized domains – WestBranch

Domain Type Domain Code Description Volume(m^3^)
Mineralized<br> Zone 3100 FVC<br> mineralization between GDI and HW BIF and disseminated in upper GDI 33,735,000
3200 Disseminated<br> in HW BIF 11,655,000
3300 Major<br> GDI Mineralization 140,900,000
3400 SVC<br> and FVC contact in the south and SVC Hosted 55,307,000
3500 South<br> part of SVC hosted mineralization 39,337,000
Envelope 13100 FVC<br> mineralization between GDI and HW BIF and disseminated in upper GDI 82,887,000
13200 Disseminated<br> in HW BIF 31,887,000
13300 Major<br> GDI Mineralization 207,900,000
13400 SVC<br> and FVC contact in the south + SVC Hosted 78,032,000
13500 South<br> part of SVC hosted mineralization 52,208,000
Waste 3999 11,995,000,000

Notes:

1. Envelope volumes are inclusive of mineralized subdomain volumes
Page 125
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 14-6: Mineralized domains – Pimentand Prolongation

Domain Type Domain Code Description Volume(m^3^)
Mineralized<br> Zone 100 Piment main<br> zone 45,880,000
200 Piment hanging wall zone 5,229,500
300 Piment and Prolongation<br> FW zone - transition to GDI at West Branch 35,274,000
400 Piment small HW lens 171,040
500 Prolongation zone main north 2,641,800
600 Prolongation zone south<br> 1 1,099,600
700 Prolongation north lens 569,880
800 Prolongation zone south<br> 2 377,450
900 Prolongation zone south<br> 3 318,010
1000 Piment FW BIF zone 2,996,200
1100 C68 and NE Satellites 1,506,500
1200 East<br> small lens - ARL zone 76,095
Envelope 10100 Piment main zone 93,927,000
10200 Piment hanging wall zone 16,390,000
10300 Piment and Prolongation<br> FW zone - transition to GDI at West Branch 73,489,000
10400 Piment small HW lens 302,400
10500 Prolongation zone main north 4,996,800
1,600 Prolongation zone south<br> 1 2,306,700
10700 Prolongation north lens 1,104,300
10800 Prolongation zone south<br> 2 755,390
10900 Prolongation zone south<br> 3 480,670
11000 Piment FW BIF zone 14,268,000
11100 C68 and NE Satellites 6,130,200
11200 East<br> small lens 548,390
Disseminated 1900 Disseminated<br> zone 4,125,600
Waste 1999 Waste 58,089,000,000

Notes:

1. Envelope volumes are inclusive of mineralized subdomain volumes
Page 126
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 14-1: Length-weighted gold distributionindicating the 0.15 g/t modelling threshold at West Branch

Page 127
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Source: SLR 2024.

Figure 14-2: Mineralized zones and envelopes – West Branch

Page 128
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Source: SLR 2024.

Figure 14-3: Mineralizedzones and envelopes – Piment

Page 129
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Source: SLR 2024.

Figure 14-4: Mineralizeddomains and envelopes – Prolongation

Page 130
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
14.6 Lithology and Redox Domains
--- ---

Since the last MRE update in 2019 the lithology model for West Branch was extended to deeper levels (3,900 m) with some updates to the interpretation of the dykes. The redox model was also updated using the logging information to better reflect the drilling data, however, these changes are considered immaterial for the results of the current MRE as the oxidized material is mined out. For Piment and Prolongation, the lithology and redox models were not changed since the last MRE update in 2019.

The summary of the lithology and redox codes is presented in Table 14-7. A lithology model is shown in Figure 7-5.

Table 14-7: Lithology and redox codes

Deposit Data Domain Codes
West Branch Lithology GDI 30
BIF 41<br> (FW) and 42 (HW)
FVC 50
Dykes 10
SGW Merged<br> as SVC Unit with a code of 61<br><br> (FW) and 62 (HW)
SSL
Redox Oxide 1
Transitional 2
Fresh 3
Piment and Prolongation Lithology GDI NA
BIF 1
FVC 2
Dykes 3
SGW 4
SSL 5
Redox Oxide 1
Transitional 2
Fresh 3

Notes:

1. HW – hanging wall; FW – footwall
Page 131
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
14.7 Resource Assays
--- ---

Compositing

The majority (approximately 96%) of the assay intervals in the database are sampled at 2.0 m or less with the vast majority (94%) having a length of 1.0 m. Therefore, samples were composited to 2.0 m, within each domain, with residual intervals less than 1.0 m added to the previous composite. Table 14-8 and Table 14-9 summarize the original and composted gold assay statistics per domain for West Branch and Piment and Prolongation, respectively.

Page 132
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 14-8: Gold assay statistics before andafter compositing – West Branch

Assays Length-Weighted Composites 2 m
Domain Code Count Length (m) Mean (g/t) Min. (g/t) Max. (g/t) CV Count Length (m) Mean (g/t) Min. (g/t) Max. (g/t) CV
Mineralized Zone
3100 29,496 29,780 0.75 0.0001 88.90 3.12 15,229 29,780 0.75 0.0001 48.30 2.47
3200 6,042 6,059 0.56 0.0001 83.50 2.73 3,185 6,059 0.56 0.0050 41.84 2.00
3300 62,310 61,614 1.49 0.0001 176.00 2.24 31,196 61,613 1.48 0.0001 169.50 1.84
3400 32,999 33,374 0.77 0.0001 170.00 3.11 16,983 33,374 0.76 0.0001 86.66 2.35
3500 23,559 22,894 0.55 0.0001 496.00 6.60 11,661 22,894 0.55 0.0001 248.08 4.63
Envelopes
13100 17,463 17,140 0.09 0.0001 50.00 7.39 8,776 17,140 0.09 0.0001 34.50 6.20
13200 2,716 2,564 0.09 0.0001 17.30 4.84 1,349 2,564 0.10 0.0001 17.30 5.15
13300 12,107 11,775 0.08 0.0001 63.00 8.49 6,076 11,775 0.08 0.0001 31.52 5.93
13400 4,466 4,352 0.08 0.0001 4.17 2.22 2,271 4,351 0.08 0.0001 3.63 1.77
13500 2,702 2,645 0.08 0.0001 3.48 2.16 1,398 2,644 0.08 0.0001 2.69 1.69
Dykes
5555 11,386 11,154 0.14 0.0001 50.00 6.39 5,663 11,154 0.14 0.0001 34.48 5.18
Waste
3999 263,304 268,736 0.05 0.0001 129.00 12.08 135,680 268,734 0.05 0.0001 90.40 10.42
Total Mineralized
154,406 153,721 1.01 78,254 153,720 1.01
Total Envelope
39,454 38,476 0.09 19,870 38,474 0.09

Notes:

1. Min = Minimum; Max = Maximum; CV = Coefficient of Variation.
2. Null vales were replaced with a background value of 0.00013 g/t.
--- ---
3. Intervals longer than two metres with no assay value were considered<br> not sampled and excluded from the estimation.
--- ---
4. Intervals shorter than two metres with no assay value were considered<br> barren and assigned the background value 0.00011 g/t.
--- ---
Page 133
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 14-9: Gold assay statistics before andafter compositing – Piment and Prolongation

Assays Length-Weighted Composites 2 m
Domain Code Count Length (m) Mean (g/t) Min. (g/t) Max. (g/t) CV Count Length (m) Mean (g/t) Min. (g/t) Max. (g/t) CV
Mineralized Zone
100 38,792 40,531 1.40 0.0001 119.00 2.66 20,676 40,514 1.39 0.0001 69.70 2.20
200 4,987 5,535 1.12 0.0001 83.50 2.50 2,885 5,531 1.11 0.0001 41.84 2.00
300 21,745 22,394 1.05 0.0001 154.00 3.66 11,561 22,375 1.04 0.0001 106.80 2.93
400 137 175 1.32 0.0050 66.40 4.00 92 175 1.34 0.0300 26.46 2.41
500 1,299 1,430 1.24 0.0001 30.90 2.27 756 1,427 1.21 0.0050 21.18 1.86
600 823 950 2.32 0.0050 49.30 2.18 500 950 2.26 0.0050 34.40 1.84
700 283 288 1.07 0.0001 34.90 3.37 150 287 1.05 0.0050 29.85 2.99
800 122 136 0.53 0.0001 14.10 2.52 71 136 0.53 0.0001 7.14 1.79
900 142 145 0.48 0.0050 11.40 2.50 75 144 0.47 0.0050 5.81 1.88
1000 1,274 1,320 0.65 0.0050 18.90 2.01 700 1,318 0.66 0.0050 11.10 1.64
1100 1,260 1,287 1.45 0.0050 68.00 3.69 681 1,284 1.41 0.0050 46.75 2.90
1200 118 119 1.89 0.0100 21.00 1.89 63 119 1.85 0.0150 18.60 1.63
Envelopes
10100 9,675 9,929 0.08 0.0001 33.50 6.00 5,165 9,920 0.08 0.0001 17.43 4.49
10200 5,105 5,331 0.07 0.0001 10.80 4.53 2,738 5,320 0.08 0.0001 4.28 3.39
10300 12,469 12,646 0.08 0.0001 166.00 18.61 6,543 12,632 0.09 0.0001 94.30 14.72
10400 106 160 0.11 0.0050 2.97 3.74 82 160 0.12 0.0050 2.97 3.34
10500 462 489 0.07 0.0001 2.44 3.00 252 488 0.07 0.0050 1.85 2.62
10600 537 581 0.07 0.0050 5.83 4.16 298 580 0.08 0.0050 2.94 3.20
10700 71 73 0.09 0.0050 1.83 3.11 38 72 0.07 0.0050 1.21 2.83
10800 25 25 0.06 0.0025 0.69 2.41 14 25 0.06 0.0025 0.39 1.75
10900 53 45 0.05 0.0050 0.33 1.50 25 45 0.06 0.0050 0.24 1.12
11000 999 992 0.06 0.0001 1.76 1.72 512 990 0.06 0.0050 1.25 1.50
11100 1,915 1,924 0.05 0.0001 3.97 3.95 993 1,924 0.05 0.0050 2.60 3.03
11200 184 184 0.05 0.0050 2.07 3.42 95 184 0.06 0.0050 1.13 2.52
Disseminated
1900 2,232 2,408 0.89 0.0001 124.00 4.81 1,280 2,408 0.86 0.0050 62.32 3.68
Waste
1999 277,318 314,363 0.03 0.0001 73.80 11.31 158,251 314,288 0.03 0.0001 57.75 8.94
Total Mineralized
70,982 74,310 1.27 0.0001 154.00 2.93 38,210 74,259 1.26
Total Envelope
31,601 32,379 0.08 0.0001 166.00 13.09 16,755 32,339 0.08
Page 134
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Capping

Capping was applied to composites within each estimation domain. The capping strategy considered a combination of probability plots, decile analysis, and capping sensitivity plots. Separation of grade populations characterized by inflections in the probability plot or gaps in the high tail of the grade distribution were indicators of potential capping values. Decile analysis was then used to confirm the reasonableness of capped threshold. A visual review of the spatial distribution of these potential capped values was also performed.

Table 14-10 and Table 14-11 summarize the composited and capped gold assay statistics for West Branch and Piment and Prolongation, respectively. Figure 14-5 and Figure 14-6 show examples of capping analysis for domain 3300 (West Branch) and domain 100 (Piment and Prolongation). The results of the analysis (visual and statistical) demonstrate well-behaved lognormally distributed grades in the capped composites dataset. The coefficient of variation (CV) values close to 2.0 or less suggest a statistically homogeneous population which is mostly the result of additional sub-domaining of the mineralized envelopes.

Table 14-10: Composited and capped gold assaystatistics – West Branch

Composites 2 m Capped Composites 2 m Difference ****
Domain Code Count Mean (g/t) Min (g/t) Max (g/t) CV Mean (g/t) Min (g/t) Max (g/t) CV Mean (g/t) **** CV ****
Mineralized Zone
3100 15,229 0.75 0.0001 48.30 2.47 0.74 0.0001 30.00 2.34 -1 % -6 %
3200 3,185 0.56 0.0050 41.84 2.00 0.54 0.0050 7.00 1.52 -2 % -24 %
3300 31,196 1.48 0.0001 169.50 1.84 1.47 0.0001 40.00 1.62 -1 % -12 %
3400 16,983 0.76 0.0001 86.66 2.35 0.74 0.0001 18.00 1.78 -3 % -24 %
3500 11,661 0.55 0.0001 248.08 4.63 0.51 0.0001 10.00 1.48 -7 % -68 %
Envelope
13100 8,776 0.09 0.0001 34.50 6.20 0.08 0.0001 3.50 2.64 -12 % -58 %
13200 1,349 0.10 0.0001 17.30 5.15 0.08 0.0001 1.20 2.01 -20 % -61 %
13300 6,076 0.08 0.0001 31.52 5.93 0.07 0.0001 1.20 1.70 -14 % -71 %
13400 2,271 0.08 0.0001 3.63 1.77 0.08 0.0001 1.00 1.20 -4 % -32 %
13500 1,398 0.08 0.0001 2.69 1.69 0.08 0.0001 1.20 1.39 -3 % -18 %
Dykes
5555 5,663 0.14 0.0001 34.48 5.18 0.12 0.0001 5.00 3.51 -8 % -32 %
Waste
3999 135,680 0.05 0.0001 90.40 10.42 0.04 0.0001 1.00 2.28 -19 % -78 %
Page 135
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 14-11: Composited and capped gold assaystatistics – Piment and Prolongation

Composites 2 m Capped Composites Difference ****
Domain Code Count Mean (g/t) Min. (g/t) Max. (g/t) CV Mean (g/t) Min. (g/t) Max. (g/t) CV Mean (g/t) **** CV ****
Mineralized Zone
100 20,676 1.39 0.0001 69.70 2.20 1.38 0.0001 37.00 2.06 -1 % -6 %
200 2,885 1.11 0.0001 41.84 2.00 1.04 0.0001 9.00 1.56 -6 % -22 %
300 11,561 1.04 0.0001 106.80 2.93 1.00 0.0001 27.00 2.36 -4 % -19 %
400 92 1.34 0.0300 26.46 2.41 0.95 0.0300 4.50 1.39 -29 % -42 %
500 756 1.21 0.0050 21.18 1.86 1.15 0.0050 10.00 1.66 -5 % -11 %
600 500 2.26 0.0050 34.40 1.84 2.05 0.0050 14.00 1.55 -9 % -16 %
700 150 1.05 0.0050 29.85 2.99 0.75 0.0050 6.00 1.63 -28 % -45 %
800 71 0.53 0.0001 7.14 1.79 0.53 0.0001 7.14 1.79 0 % 0 %
900 75 0.47 0.0050 5.81 1.88 0.47 0.0050 5.81 1.88 0 % 0 %
Envelope
1000 700 0.66 0.0050 11.10 1.64 0.63 0.0050 5.00 1.39 -5 % -15 %
1100 681 1.41 0.0050 46.75 2.90 1.24 0.0050 17.00 2.31 -12 % -20 %
1200 63 1.85 0.0150 18.60 1.63 1.53 0.0150 6.00 1.19 -17 % -27 %
10100 5,165 0.08 0.0001 17.43 4.49 0.08 0.0001 3.00 3.04 -7 % -32 %
10200 2,738 0.08 0.0001 4.28 3.39 0.08 0.0001 3.00 3.17 -2 % -6 %
10300 6,543 0.09 0.0001 94.30 14.72 0.06 0.0001 3.00 2.87 -25 % -81 %
10400 82 0.12 0.0050 2.97 3.34 0.12 0.0050 2.97 3.34 0 % 0 %
10500 252 0.07 0.0050 1.85 2.62 0.07 0.0050 1.85 2.62 0 % 0 %
10600 298 0.08 0.0050 2.94 3.20 0.08 0.0050 2.94 3.20 0 % 0 %
10700 38 0.07 0.0050 1.21 2.83 0.07 0.0050 1.21 2.83 0 % 0 %
10800 14 0.06 0.0025 0.39 1.75 0.06 0.0025 0.39 1.75 0 % 0 %
10900 25 0.06 0.0050 0.24 1.12 0.06 0.0050 0.24 1.12 0 % 0 %
11000 512 0.06 0.0050 1.25 1.50 0.06 0.0050 1.25 1.50 0 % 0 %
11100 993 0.05 0.0050 2.60 3.03 0.05 0.0050 1.00 2.14 -9 % -29 %
11200 95 0.06 0.0050 1.13 2.52 0.06 0.0050 1.13 2.52 0 % 0 %
Disseminated
1900 1,280 0.86 0.0050 62.32 3.68 0.76 0.0050 17.00 2.47 -12 % -33 %
Waste
1999 158,251 0.03 0.0001 57.75 8.94 0.03 0.0001 3.00 4.04 -11 % -55 %
Page 136
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 14-5: Cappinganalysis for Domain 3300 – West Branch

Page 137
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 14-5: Capping analysis for Domain 3300 – West Branch

Figure 14-6: Capping analysis for Domain 100 – Piment and Prolongation

14.8 Variography

The author used Snowden Supervisor software (version 8.13) to calculate and model gold variograms for the mineralized domains. Variograms were computed on composited capped grade values producing variograms with a normalized sill value of 1.0. For each domain, two different spatial metrics were assessed: (1) traditional semi-variogram of gold, and (2) correlogram of gold and the most appropriate fit was selected. Downhole variograms were calculated to determine the nugget effect. The nugget effect is generally between 30% and 40% for all domains, with the nugget effect for domain 3300 (West Branch) and domain 100 (Piment and Prolongation) interpreted at 30%. The composite data was grouped for smaller domains with the details of the grouping presented in Table 14-12 and the variogram models for West Branch in Table 14-13. The variogram model for domain 3300 (West Branch) is presented in Figure 14-7 and shows continuity of 300 m x 100 m in the major and semi-major directions.

Page 138
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 14-12: Domain groupings for variogramanalysis

Deposit Variogram Code Source of Data: Domains Used for Estimation: Domains
West Branch WB_3100 3100 3100
WB_3200 3200 3200
WB_3300 3300 3300
WB_3400 3400 3400
WB_3500 3500 3500
WB_ENV 13100-13200, 13400-13500 13100-13200, 13400-13500
WB_13300 13300 13300
Piment and Prolongation
PP_100 100 100
PP_300 300 300
PP_SMALL 200 and 400-1000 200, 400-1000 and 1900
SAT 1100-1200 1100-1200
PP_ENV 10100-11000 10100-11000
SAT_ENV 11100-11200 11100-11200
Page 139
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 14-13: Gold variogram model results perdomain – West Branch

Domain Rotation<br> Leapfrog Structure Type Nugget Major Intermediate Minor Sill Model
3100 50-80-150 1 Sph 0.4 25 10 4 0.4 Cor + Var
2 Sph 200 100 8 0.2
3200 50-80-150 1 Sph 0.4 30 10 4 0.5 Cor + Var
2 Sph 150 80 8 0.1
3300 50-80-150 1 Sph 0.3 35 30 5 0.35 Var
2 Sph 300 100 25 0.35
3400 50-80-150 1 Sph 0.4 25 10 4 0.4 Cor + Var
2 Sph 150 110 8 0.2
3500 50-80-150 1 Sph 0.4 17 17 4 0.5 Cor + Var
2 Sph 120 120 8 0.1
13100+13200+13400+13500 50-80-150 1 Sph 0.5 70 20 5 0.4 Var
2 Sph 100 100 7 0.1
13300 50-80-150 1 Sph 0.5 60 35 4 0.4 Var
2 Sph 250 100 5 0.1
Page 140
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 14-7: Gold variogram for Domain 3300 – West Branch

14.9 Density

Consistent with the previous modelling rationale, the combination of lithology and redox was used to assign the density values to the block model. The values assigned are based on an extensive study conducted on the exploration data and were not changed since the previous estimation. The quality of the density database was found to be suboptimal, however, and the direct reproduction of the assigned density values from the drilling data was not possible. This does not appear to be a material risk to tonnage estimates as the deposit was in operation for many years with satisfactory results for tonnage reconciliation with the previous models. The assigned density values are presented in Table 14-14 and Table 14-15.

Page 141
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 14-14: Assigned density values (t/m^3^) – West Branch

Lithology
Oxidation Dykes GDI BIF HW BIF FW FVC SVC HW SVC FW
Oxide 2.81 2.38 2.80 2.53 2.15 2.46 2.35
Transitional 2.89 2.72 2.89 2.85 2.64 2.65 2.64
Fresh 2.98 2.87 3.27 3.18 2.68 2.90 2.76

Table 14-15: Assigned density values (t/m^3^) – Piment and Prolongation

Lithology
Oxidation BIF FVC Dykes SGW SSL
Oxide 3.00 2.39 3.00 2.57 2.89
Transitional 3.05 2.66 3.00 2.66 2.89
Fresh 3.14 2.72 3.00 2.80 2.89
14.10 Search Strategy and Estimation Parameters
--- ---

The block model was populated with estimated gold grades using OK in the mineralized envelope and sub-domains, applying up to three estimation runs with progressively relaxed search ellipsoids and data requirements. The unmineralized domain (3999) was estimated using ID^2^. All passes use an ellipsoidal search based on the variogram model approach and for domains 100, 300, and 500 (Piment and Prolongation) dynamic anisotropy, based on a structural trend, was used to conform to the varying orientation of the modelled zones. In all cases, gold was estimated using a hard boundary. Furthermore, an additional limited search radii estimation was used after detailed calibration of the model performance to the short-term model. Table 14-16 and Table 14-17 summarizes the search ellipse dimensions and sample selection plan per domain.

Page 142
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 14-16: Search ellipse dimensions

Variogram Range Search Ellipse
Deposit Estimation Domain X Y Z Logic Run 1 X Y Z Logic Run 2 Logic Run 3
Piment and Prolongation PP_100 180 70 25 0.9 sill 100 40 30 2x 5x
PP_300 100 65 25 0.95 sill 60 35 30 2x 5x
PP_ENV 70 70 20 1 sill 70 70 30 2x 10x
PP_SMALL 115 65 25 1 sill 115 65 30 2x 10x
SAT 65 65 15 1 sill 65 65 30 2x 5x
SAT_ENV 40 40 10 1 sill 40 40 30 2x 5x
West Branch WB_3100 200 100 8 0.95 sill 100 50 40 2x 5x
WB_3200 150 80 8 0.95 sill 60 40 40 2x 5x
WB_3300 300 100 25 0.90 sill 150 60 40 2x 5x
WB_3400 150 110 8 0.95 sill 100 65 40 2x 5x
WB_3500 120 120 8 0.95 sill 60 60 40 2x 5x
WB_ENV 100 100 7 0.95 sill 60 60 40 2x 10x
WB_13300 250 100 5 0.95 sill 120 60 40 2x 10x
3999 50 50 30
Page 143
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 14-17: Sample selection plan

Estimation Min. – Max. Samples Max. HG Limited
Deposit Domain Run 1 Run 2 Run 3 Comps/Hole Radii
Piment and Prolongation PP_100 7-15 4-18 2-24 3 15 m @8 g/t<br> limited search
PP_300 7-15 4-18 2-24 3
PP_ENV 7-15 4-18 2-24 3
PP_SMALL 7-15 4-18 2-24 3
SAT 7-15 4-18 2-24 3
SAT_ENV 7-15 4-18 2-24 3
West Branch WB_3100 11-25 6-30 2-40 5 12 m @10 g/t<br> limited search
WB_3200 11-25 6-30 2-40 5
WB_3300 11-25 6-30 2-40 5
WB_3400 11-25 6-30 2-40 5
WB_3500 11-25 6-30 2-40 5
WB_ENV 11-25 6-30 2-40 5
WB_13300 11-25 6-30 2-40 5
3999 2-25 5
14.11 Block Model
--- ---

The block models for both deposits were developed without the overlap to avoid a double accounting for the mineralized tonnage. The West Branch model covers a 500 m deeper extent than the 2019 model and the updated Piment and Prolongation model. The block dimensions reflect the corresponding drilling grid with sub-blocking parameters selected to provide improved filling of the estimation domains and a good resolution for potential underground planning. No rotation was applied to the block model. Table 14-18 summarizes the block model and Figure 14-8 shows the block model extents for West Branch and Piment and Prolongation.

Page 144
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Table 14-18:Block model dimensions

Origin Blocks Block Size (m) Min. Sub-block (m)
Deposit X Y Z X Y Z X Y Z X Y Z
Piment<br> and Prolongation 45,280 73,510 4400 440 756 150 5 10 5 1.25 2.50 1.25
West<br> Branch 46,000 69,930 3,900 248 358 125 10 10 10 2.50 2.50 2.50

Source: SLR 2024.

Figure 14-8:Block model extents

Page 145
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report
14.12 Block Model Validation
--- ---

The estimated block model was validated using a combination of methods including visual comparison of block estimates and informing composites (Figure 14-9 to Figure 14-11), swath plots, and change-of-support checks using the nearest neighbour (NN) de-clustered distribution as well as visual and statistical validation against the short-term grade control model.

The along strike swath plot for domain 3300 and domain 100, showing the ordinary kriged block model with the NN de-clustered composites, is presented in Figure 14-12. The swath plot shows generally good agreement between the kriged estimation and the NN de-clustered data. The quantile-quantile (QQ) plot, presented in Figure 14-13, shows the change-of-support verification for domain 3300. The plot shows the ordinary kriged estimate (Y-axis) corresponds well to the de-clustered change-of-support corrected distributions (X-axis). Mineral Resources at West Branch, Piment, and Prolongation were audited by SLR in 2024.

Page 146
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Figure 14-9:Visual comparison of West Branch composite and block model gold grades

Page 147
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Figure 14-10:Visual comparison of Piment composite and block model gold grades

Page 148
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Figure 14-11:Visual comparison of Prolongation composite and block model gold grades

Page 149
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Notes:

1. Histogram<br> corresponds to block model volume along the swath

Figure 14-12:Swath plot for Domain 3300 and Domain 100

Page 150
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Figure 14-13:Change of support QQ plot for Domain 3300 – West Branch

The block models for both deposits were also compared with the short-term models estimated using the grade control data. The comparison between the 2022 and 2019 resource block models and the short-term grade control model for West Branch, at a cut-off of 0.7 g/t and covering the mining area between 2019 and 2022, is presented in Figure 14-14 and Figure 14-15. For both deposits the 2022 resource model demonstrates reasonable comparison with the grade control model, with metal difference at the reporting cut-off of 0.70 g/t gold, not exceeding 1% in contained ounces.

Page 151
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Figure 14-14:Swath plot comparing the resource models and short-term model – West Branch

Figure 14-15:QQ plot comparing the 2022 resource model and short-term model – West Branch

Page 152
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report
14.13 Classification
--- ---

Definitions for Mineral Resource categories used in this Technical Report are consistent with those defined by CIM (2014) and adopted by NI 43-101. In the CIM classification, a Mineral Resource is defined as “a concentration or occurrence of solid material of economic interest in or on the Earth’s crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction”.

Mineral Resources are classified into Measured, Indicated, and Inferred categories. A Mineral Reserve is defined as the “economically mineable part of a Measured and/or Indicated Mineral Resource” demonstrated by studies at Pre-Feasibility or Feasibility level as appropriate. Mineral Reserves are classified into Proven and Probable categories.

The classification strategy considers the confidence in geology continuity, drill hole spacing, and proximity to the current mining areas and grade control drilling. To assist in categorization, the separate block model was created and then post-smoothed to ensure continuity within the classification categories. The classified block model was then examined visually on plans and sections. A summary of the classification criteria is presented in Table 14-19 and the West Branch classification wireframes together with the block model, filtered at one gram per tonne of gold, are shown in Figure 14-16. Piment and Prolongation are shown in Figure 14-17.

Page 153
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Table 14-19:Classification criteria

Deposit Criteria Measured Indicated Inferred Unclassified
Piment<br> and Prolongation Geology<br> Continuity Domains<br> 100-800 and 10100-10800 Domains<br> 100-900 and 10100-10900 All<br> domains except 1900 and 1999 All<br> domains
Geometry<br> Criteria 3<br> holes in 25 m buffer Equivalent to 30-35 m drill spacing 3<br> holes in 50 m buffer Equivalent to 70 m drill spacing 2<br> holes in 60 m buffer Equivalent to 120 m drill spacing The<br> rest of the mineralized material
Production<br> Data Approx.<br> 30 m buffer from GC drilling NA NA NA
West<br> Branch Geology<br> Continuity All<br> domains except 3999
Geometry<br> Criteria 3<br> holes in 25 m buffer Equivalent to 30-35 m drill spacing 3<br> holes in 45-50 m buffer Equivalent to 70 m drill spacing and 60 m for disseminated domains (not 3300) 2<br> holes in 75 m buffer Equivalent to 150 m drill spacing The<br> rest of the mineralized material
Production<br> Data Was<br> not explicitly used because already corresponds well with the geometry criteria
Page 154
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Source: SLR 2024.

Figure 14-16:Classification – West Branch

Page 155
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Source: SLR 2024.

Figure 14-17:Classification – Piment and Prolongation

Page 156
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report
15. Mineral Reserve Estimate
--- ---

The Mineral Reserve for the Tasiast open pit mine was estimated using a planning model derived from the resource models for West Branch (WB), for Piment (PM), and Fennec (FN) models, as discussed in Section 14.

The 24 kt/d pre-feasibility Mineral Reserves, effective December 31, 2024, were estimated using the mine planning block model and using parameters as shown in Table 15-2. The Mineral Reserve estimate includes material contained within the final pit design that can be extracted and processed economically. Reported reserves are solely based on the Measured and Indicated mineral resource classifications, which correspond to Proven and Probable reserves classifications.

Mineral Reserves for the Tasiast Mine, including the West Branch, Piment, and Fennec deposits, are presented in Table 15-1.

Page 157
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Table 15-1: TasiastMineral Reserve Estimate as at December 31, 2024

Deposit Classification Tonnage<br><br> (kt) Grade<br><br> (g/t Au) Contained Gold (koz Au)
West Branch
Proven 1,889 1.12 68
Probable 34,683 1.93 2,147
West Branch Total 36,571 1.88 2,216
Piment
Proven 12,930 1.38 572
Probable 8,875 1.57 447
Piment Total 21,804 1.45 1,019
Fennec
Proven 0 0.00 0
Probable 1,913 1.79 110
Fennec Total 1,913 1.79 110
Stockpile(s)
Proven 42,542 0.99 1,361
Stockpiles Total 42,542 0.99 1,361
Combined
Proven Subtotal 57,361 1.08 2,000
Probable Subtotal 45,471 1.85 2,705
Combined Total 102,831 1.42 4,705

Notes:

1. CIM<br> (2014) definitions were followed for Mineral Reserves.
2. Mineral<br> Reserves are limited to blocks within the reserve pit design and within mineable panels/polygons<br> within which blocks meet an average cut-off grade of 0.6 g/t Au and consider ore loss, dilution,<br> and mining selectivity.
--- ---
3. Mineral<br> Reserves are estimated using an average long-term gold price of US$1,600 per ounce.
--- ---
4. Bulk<br> density is estimated and averages 2.91 t/m^3^.
--- ---
5. Numbers<br> may not add due to rounding.
--- ---

The QP is not aware of any mining, metallurgical, infrastructure, permitting, or other relevant factors that could materially affect the Mineral Reserve estimate.

Page 158
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report
15.1 Basis of Reserve Estimate and Pit Optimization
--- ---

An economic pit shell generated at a gold price of US$1,600/oz, with cost criteria, metallurgical recoveries, and geologic and geotechnical considerations guides the final pit design. The economic pit shell used to define the final pit limits was created using Datamine’s NPV Scheduler software (NPVS). NPVS utilizes the Lerchs-Grossman (LG) algorithm to define blocks that can be mined at a profit. The program then creates an economic shell based on the following information:

· Starting<br> topography
· Overall<br> slope angles by rock type
--- ---
· Metallurgical<br> recoveries by mineralization and rock type and oxidation state
--- ---
· Geologic<br> grade model with gold grades, density, lithology, and mineral types
--- ---
· Process<br> (including rehandle) and mining costs
--- ---
· Incremental<br> vertical bench mining cost
--- ---
· Downstream<br> costs, such as gold refining, freight, and marketing
--- ---
· Sustaining<br> capital for future equipment replacements
--- ---

The Mineral Reserve Estimate was prepared using the December 31, 2024 topography and the parameters detailed in Table 15-2.

Page 159
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Table 15-2: Pitoptimization parameters

LG Parameter Cost /<br><br> Assumption Unit
Piment (PM) Mining Unit Cost 2.58 US$/t
PM Haulage Increment per Bench 0.045 US$/t/bench
West Branch (WB) Mining Unit Cost 2.58 US$/t
WB Haulage Increment per Bench 0.045 US$/t/bench
Total Mining Unit Cost 3.48 US$/t
Mining Sustaining Capital 0.24 US$/t
Processing Unit Cost 15.61 US$/t ore
Site Admin Unit Cost 8.23 US$/t ore
Processing Sustaining Capital 1.55 US$/t ore
Stockpile Re-handle 0.90 US$/t ore
Gold Price 1,600 US$/oz
Total Selling Cost (including below) 148.89 US$/oz
Royalties 8.22 %
Payable 99.95 %
Refining Charges and Fees 5.47 US$/oz
Reclamation Cost 11.06 US$/oz
Discount Rate 5.0 %

Mineral Reserves are stated within an ultimate pit design at cut-off grades that are based on the process type, operating costs, and metallurgical recovery.

Slope parameters based on geotechnical considerations were applied to the pit design along with ramps and geotechnical catch benches, and were subsequently used to generate overall slope angles. The overall slope angles used in pit optimization are shown in Table 16-4 and Table 16-5.

Gold recovery is determined by ore type and process method. The gold recovery is calculated from the information in Table 15-3 where gold grade is expressed in grams per tonne (g/t).

Page 160
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Table 15-3: ProcessRecoveries

Process Au Recovery
CIL<br> Recovery (Au-MAX(Au*(1-0.25)*(1-(1.6772*LN(Au*(1-0.25))+90.8)/100),0.04+0.015*(1-0.6)/0.6))/Au<br> ^1^

Notes:

1. Head<br> grade vs. recovery relationship develop from test work.
2. Au<br> = head grade, g/t.
--- ---

The mine operating costs used for pit optimization include ongoing major mine equipment capital costs. The mine equipment sustaining capital was used in the economic model to simulate mine capital expenditures when generating the economic pit.

The top-down discount method was used during pit optimization. This is a procedure based on multiplying the block value by a discount factor that is a function of the annual cost of capital, an estimate of the average annual vertical advance rate of mining, and the relative depth of the block. This method simulates the actual mine plan discounted cash flow that is burdened with up front stripping costs and aids in the selection of a higher value pit.

Page 161
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report
16. Mining Methods
--- ---
16.1 Mining Operations
--- ---

The Complex is located in northwestern Mauritania, approximately 300 km north of the capital Nouakchott and 250 km east-southeast of the port city of Nouâdhibou. The Tasiast Permit Area is in the Inchiri and Dakhlet Nouâdhibou districts.

The Complex is located in a remote part of the Sahara Desert, consisting largely of flat barren plains covered by stony surface with some sand and soil, interspersed with occasional sand dunes and upstanding outcrops of bedrock. The average elevation is approximately 130 masl. Vegetation is sparse and consists primarily of grasses and occasional acacia trees. The climate is Saharan with an average rainfall of 90 mm, most of which falls from July to September. The climate is hot most of the year ranging from 10°C to 45°C and experiences strong prevailing NE-SW winds from the Sahara and occasional reverse SW-NE winds from the Atlantic.

The main ore hosting lithology is a Granodiorite Intrusive (GDI) with lesser contributions from the FVC (Felsic Volcaniclastic) and BIM (Banded Iron Magnetite). The orebody strikes at approximately 350° and dips easterly at approximately 50°, true width is approximately 40 m.

Ore and waste rock is mined in 10 m benches by conventional open pit methods from the West Branch, Piment, and Fennec deposits. A view of the current West Branch pit is presented in Figure 16-1. Tasiast currently operates a haulage fleet of 45 Caterpillar 793D (220 t), five Hitachi EH-4000 (220 t), and two Komatsu HD785 (92 t). The haulage fleet is primarily loaded by six Caterpillar 6060 shovels and two Bucyrus RH340B excavators, with three Caterpillar 994 front-end loaders utilized for rehandle purposes and four Komatsu PC1250s for auxiliary loading of the smaller Komatsu trucks. Blasting techniques, including presplit and buffer hole blasting, are employed to protect the pit walls. The grinding circuit produces a product size of 80% passing 90 µm which is processed in a conventional CIL circuit to produce gold bullion. Gold recovery averages 93%. Tailings slurry from the CIL process is pumped to the tailings storage facility (TSF).

Commercial production of gold at Tasiast began in January 2008 under Red Back. As of December 31, 2024, approximately five million ounces have been produced by Tasiast. Prior mining has taken place in West Branch, Piment, and several smaller pits at Tasiast. From late 2010 when Kinross acquired the property to the end of 2024, a total of 997 Mt of material have been mined from various pits, including 61 Mt in 2022, 63 Mt in 2023 and 71 Mt in 2024.

Page 162
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Figure 16-1:West Branch Pit - looking southwest

The current mill operates at approximately 24 kt/d. Ore is fed directly from the mines and stockpiles to the primary crusher.

Cut-off grades are based on the net block value and cut-over grades applied during scheduling. Applying cut-over grades during scheduling ensures that the highest value materials are routed to the CIL process over time. Lower grade materials are routed to stockpiles. All materials below the cut-off grade are sent to waste destinations. The grades and potential destinations used for strategic planning are shown in Table 16-1.

Page 163
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Table 16-1: Materialrouting

Grade Bin<br><br> (g/t) Identification Potential<br> Stockpile
2.0+ Super High Grade (SHG) “Purple” Stockpiles
1.5-2.0 High Grade (HG) “Red” Stockpiles
1.1-1.5 Medium Grade (MG) “Blue” Stockpiles
0.7-1.1^1^ Low Grade (LG) “Green” Stockpiles
0.4-0.7 Mineralized Waste “Sub-Green” Stockpiles

Notes:

1. Mineral<br> Reserves cut-off grade has since been updated to 0.6g/t Au (as described in Section 15).

During the expansion of the processing plant to 24 kt/d, one Caterpillar 6060 shovel and five Hitachi EH-4000 haul trucks were added to the primary mobile fleet to support production. Further to the plant expansion, satellite pit mining at Piment and Fennec includes an additional eight Caterpillar 777 haul trucks (arriving in 2025), one Caterpillar 6030 shovel (2025), and 1 Caterpillar 992 front-end loader (2026). Estimates of future equipment utilization are based on current operating practices, general and site experience, and the following considerations:

· Operation<br> of several mining faces simultaneously to meet the long-range schedule and requirements.
· Use<br> of large-scale mining equipment to lower operating costs.
--- ---
· Use<br> of well-proven and advanced mine equipment technologies to improve performance.
--- ---
· Use<br> of component replacement and preventive maintenance practices to minimize major equipment<br> failures.
--- ---
· Design<br> of constraints to accommodate the selected fleets in both direct production and support roles.
--- ---

The existing primary production equipment and satellite pit fleet will be used for the duration of mining and no replacement of this equipment is anticipated, however, there will be an addition of two Komatsu PC1250 excavators, one Sandvick D650i drill, and one Caterpillar MD6250 drill. Equipment life has been projected from actual operating hours, with estimates of future usage based on the mine plan. The current mining fleet at Tasiast is shown in Table 16-2, as well as the LOM peak unit usage (including future purchases).

Page 164
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Table 16-2: 24kt/d total mobile equipment fleet

Mobile Equipment Units Available in<br><br> 2025 LOM Peak
Hauling
Caterpillar 793D 45 45
Hitachi EH-4000 5 5
Komatsu HD785 2 2
Caterpillar 777 8 8
Loading
Caterpillar 6060 6 6
Bucyrus RH340 2 2
Komatsu PC1250 4 6
Caterpillar 994 3 3
Caterpillar 6030 1 1
Caterpillar 992 0 1
Drilling
DR580/D560i 7 8
Caterpillar MD6250 6 7
Bucyrus SKFX 3 3
Atlas PV 235 1 1
16.2 Mine Design
--- ---

The Tasiast WB and PM final pit designs consist of a series of pits that extend along a strike length of approximately eight kilometres. The configuration of the mining area is shown in Figure 16-2. Both WB and PM deposits are actively being mined in 2025. The Fennec satellite deposit is located approximately 10 kilometres north of the CIL plant.

Page 165
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Figure 16-2:Plan view of Tasiast site

Geotechnical Considerations

Historically, the Complex has been divided into two geotechnical zones where the Piment Zone is north of approximately 72,000 N and the West Branch Zone is south of 72,000 N. Overall pit slope angles and inter-ramp angles for the Piment Zone were initially determined by Scott Wilson Mining UK (Scott Wilson) in 2009 and subsequently optimized by Stacey Mining Geotechnical Ltd (Stacey) in 2011. The slope angles that are applied at Piment are shown in Table 16-4.

Page 166
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Golder Associates, the engineer of record for Tasiast, generated the slope design parameters for West Branch as summarized in Table 16-5. These slope parameters are based on the assumption that appropriate practices in dewatering or depressurization, drilling and blasting, and movement monitoring are effectively implemented and carried out. The design criteria that have been used in the study of the open pit stability are based on the best practice guidelines presented in Table 16-3. For overall slope failure, a target factor of safety (FoS) of 1.3 was used in the slope stability analysis.

Table 16-3: SlopeFoS Criteria

Slope<br> Scale Consequence<br> of<br><br> Failure Static<br> Acceptance Criteria<br><br> (FoS) Dynamic<br> Acceptance<br><br> Criteria (FoS)
Bench Low - High 1.1 NA
Inter-ramp Low <br>Medium <br>High 1.15 - 1.2 <br>1.2 <br>1.2 - 1.3 1.0 <br>1.0 <br>1.1
Overall Low <br>Medium <br>High 1.2 - 1.3 <br>1.3 <br>1.3 - 1.5 1.0 <br>1.05 <br>1.1

Slope stability analysis has been carried out to provide the FoS mentioned above for slopes within the pit. Two methods of analysis have been employed incorporating both Limit Equilibrium and Finite Element numerical modelling methods. The conclusions of the slope stability assessment are as follows:

· All<br> slopes meet the target design criteria;
· Good<br> correlation has been seen between the two methods of analysis;
--- ---
· Safety<br> Factors on the Footwall indicate there may be potential to undercut the foliation, however<br> on balance this is not recommended because of the possible risk of slope failure if the incipient<br> foliation planes open;
--- ---
· Safety<br> Factors for the Hanging Wall indicate there may be potential for an increase in the Inter<br> Ramp Angle (IRA); and
--- ---
Page 167
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report
· Tabular<br> bench scale failure is to be expected on the Footwall where the Bench Face Angle (BFA) is<br> greater than the foliation angle.
--- ---

It was concluded from the slope stability analysis that the rock mass is of sufficient quality to incorporate the 75° bench face angle geometry proposed for the Hanging Wall.

Geotechnical berms of 20 m at the boundary of transition and fresh rock material and 15 m for every 150 m of vertical wall (with a ramp passing through) are also required in the pit designs.

Although the Fennec pit design continues to evolve, the current design is representative for ore, grade, and overall tonnage. Geotechnical design parameters are based on Piment parameters in Oxide and Transition (all walls), and Piment HW in fresh rock (single bench).

Kinross Technical Services reviewed and recompiled rock mass rating (RMR) data in 2017. The data indicated that the rock mass quality in the Lower Transition zone is in the same range as that in the Fresh zone, as shown in Figure 16-3. After consultation with Stacey, a modification to the bench face angle (BFA) for the hanging wall was recommended and the proposed BFA was 70° with a calculated inter-ramp angle (IRA) of 52°; the Footwall specifications did not change.

Table 16-4: Geotechnicaldesign parameters - Piment Zone

Zone Depth (m) Wall(s) Bench Face Angle (°) Inter-Ramp Angle (°) Total Bench Height (m) Berm Width (m)
Oxide 0 - 10 All walls 60 39 10 6.5
Transition 10 - 50 West wall (FW) 50 34 10 6.5
All other walls 65 42
Fresh > 50 West walls (FW) 50 38.5 20 8.5
East walls (HW) and end walls 75 55
Page 168
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Table 16-5: Geotechnicaldesign parameters - West Branch Zone

Zone Depth (m) Azimuth Bench Face Angle (°) Inter-Ramp Angle (°) Total Bench Height (m) Berm Width (m)
Oxide 0 - 30 330° to 210° 60 39.2 10 6.5
210° to 330° 45 31.2
Upper Transition 30 - 60 330° to 210° 65 41.9 10 6.5
210° to 330° 45 31.2
Lower Transition 60 - 100 330° to 210° 70 52 20 8.5
210° to 330° 45 35.1
Fresh >100 330° to 210° 75 58.3 30 10.5
210° to 330° 45 36.5

Figure 16-3:Rock mass rating vs. depth (all West Branch data)

Page 169
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Pit Design

The basis for the final pit design is an optimized economic shell generated using Datamine’s NPVS software package. NPVS uses the LG algorithm to define blocks that can be mined at a profit. Cut-off grade and pit limits developed in NPVS were defined using the criteria outlined in Section 15. Adjusted overall slope angles were used to define the slopes in NPVS. These adjustments were used to address the placement of ramps within the mined area. Only Measured and Indicated resources were used to define this limit. Sensitivity analyses were carried out comparing the effects of high and low ranges for various inputs on ore tonnes and contain gold ounces mined. Inputs tested were gold price, mining cost, processing cost, CIL recovery, and pit slopes. High- and low- end ranges for the sensitivity analyses are as follows:

· Gold<br> price: -25% to +25%
· Mining<br> cost: -20% to +20%
--- ---
· Processing<br> cost: -20% to +20%
--- ---
· CIL<br> recovery: -3.5% to +3.5%
--- ---
· Pit<br> slopes: -4° to +4°
--- ---

See Figure 16-4 and Figure 16-5 for the sensitivity analysis.

Page 170
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Figure 16-4:Sensitivity analysis – ore tonnes

Figure 16-5:Sensitivity analysis – contained gold

Page 171
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

The detailed mine design used to define reserves was based on key considerations that include:

· Compliance<br> with the geotechnical recommendations for slope angle set out by the geotechnical studies<br> for haul road widths and maximum effective grades for operation with the existing fleet.
· Bench<br> height that is safely manageable with the existing fleet of Caterpillar 6060 face shovels<br> and RH340 excavators.
--- ---
· Minimum<br> allowable mining width for practical mining with the existing shovel fleet.
--- ---
· Pit<br> exits near material destinations (i.e., stockpiles, waste destinations, and primary crusher).
--- ---
· Options<br> that provide for two or more operational ramps to increase the flexibility and viability<br> of the mining layout.
--- ---

Inter-rampslopes – Inter-ramp slopes are based on geotechnical recommendations outlined in the previous subsection and vary according to the slope sector involved. Inter-ramp slope angles range from 31.2° to 58.3° based on the criteria. The inter-ramp angles and the bench face angles were adhered to for the pit and phase designs. Catch benches for the design vary based on bench face angles and ultimate bench height. The overall design slopes include access ramps and follow the same criteria used in the LG cone calculation.

Benchheight – The design operating bench height is 10 m. The final pit walls in West Branch will be triple benched where it is permissible, resulting in a bench height of 30 m with intervening catch benches. Piment will be double benched, resulting in a 20 m bench height with the appropriate catch benches. Satellite pits will be single benched (at 10 m).

Minimummining width – A phased approach was taken as an optimization strategy to improve the mining sequence. Efforts were made to maximize mining width where possible. Where mining widths indicated by the selected LG shells were too narrow (<45 m) to safely or effectively mine, the phase walls were pushed out to the final pit design.

Access– Dual lane haul roads for the current designs are 32.5 m wide. Ramps are designed at a maximum gradient of 10%. Intersections and switchback curves are designed without grade (flat) wherever possible. Two main haul roads exit the West Branch pit, with a third ramp exiting the pit through the WB extension at the northern end of the pit. These haul roads split to minimize haul times between different destinations. Piment will also incorporate two main haul road exits. For the satellite pits, dual lane haul roads in the current design are 23.2 m with similar design parameters (grade and corners) to the West Branch and Piment pits. Haul road profiles are shown in Figure 16-6. Haul road dimensions are shown in Table 16-6.

Page 172
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Figure 16-6:Haul road profile

Table 16-6: Double-lanehaul road dimensions

Road Attribute West Branch and Piment Satellite Pits
Safety berm (SB) 4.6 m 3.6 m
Space between truck and safety berm (STB) 3.8 m 2.65 m
Truck width (TW) 7.6 m 5.3 m
Space between trucks (ST) 3.8 m 2.65 m
Space between truck and ditch (STD) 3.8 m 2.65 m
Ditch width (DW) 1.0 m 1.0 m
Ramp width 32.5 m 23.2 m

Detailed pit design work was completed using Deswik CAD software. The Deswik CAD software Design & Solids Modeling tool uses design parameters contained within the 3D block model to ensure compliance to available geotechnical parameters. Isometric views of the West Branch and Piment main pits, and the Piment and Fennec satellite pits are shown in Figure 16-7 through Figure 16-10.

Page 173
Kinross<br> Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Figure 16-7:West Branch pit isometric view

Figure 16-8:Piment pit isometric view

Page 174
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 16-9: Piment satellite pit isometricview

Figure 16-10: Fennec satellite pit isometricview

Page 175
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Waste Dumps

Waste rock is used for haul road and tailings dam construction as needed. The existing road network is well developed and requires continued maintenance. Additional roads will also be required throughout the LOM. These roads will be constructed using the current mining and support mining fleets.

Dumped waste material comprises weathered and fresh rock. Blasted weathered rock is finely graded, including clay-silt fines. The fresh rock is strong and massive and, when blasted, is coarsely graded, including boulders that can require secondary blasting prior to loading.

As the climate is arid and there is no permanent surface water and very limited groundwater, there is low potential for ARD, however, any potential ARD issue will be mitigated by ensuring that material that is identified as potentially acid forming (PAF) will not be dumped on the outer shell of the waste dumps.

The dump design is based on 40 m high lifts with a maximum overall effective slope of 2H:1V (27° overall slope angle). The maximum dump height is currently limited to 100 m total vertical height. The dumps will be accessed by 35 m wide dual-lane ramps at a maximum gradient of 10%. Track bulldozers will be used to assist the haulage fleet to facilitate proper dump construction, including grading the top of each lift away from the pit to direct any rainwater run-off and placing coarsely graded, fresh rock on final dump faces.

The waste dumps are located within the footprints of previous studies and require no modification to the current permitting.

There is one active waste dump along the west side of the Piment pit and four active waste dumps along the south, east, and west sides of the West Branch pit (Figure 16-2). An additional waste dump is planned next to the Fennec satellite pit. Based on the current mine plan, the waste dumps will require 325 Mt of capacity after 2024, and an additional 16 Mt to the Fennec dump. The current permitted waste dumps have excess capacity relative to the current mining requirement.

16.3 Schedules

Pushback Sequences

Phased pushbacks were developed to optimize the mining sequence for both West Branch and Piment (Figure 16-11 and Figure 16-12, respectively). Five pushbacks were developed for the West Branch pit: WB1, WB2, and WB3 have been completed, and WB4 will be completed in 2025. Piment consists of two phases located around the current Piment Central pit.

Page 176
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 16-11: West Branch (WB) pit phasing

Page 177
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 16-12: Piment (PM) pit phasing

A cross-section of the West Branch pit is shown in Figure 16-13. This section illustrates how the pushback sequencing targeted high ore zones while minimizing the waste stripping requirements during the early pushbacks. As of the end of 2024, the early pushbacks are largely depleted, with the pit advancing into the higher strip WB5 phase.

Page 178
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 16-13: West Branch production advancesection view

Page 179
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Mine Production Rate

The mine production schedule is optimized to maximize value and gold grade of feed material at the CIL plant, which operates at a throughput rate of 24 kt/d. The planned mining rate peaks from 2025 to 2027 at 75 Mtpa to 80 Mtpa (Figure 16-14) and then ramps down as the pits are depleted. Over the next few years, the majority of mining will take place in higher strip ratio pushbacks and, therefore, mill feed will be supplemented by high-grade stockpiles. This mining profile leverages fleet capacity and maximum vertical advance throughout.

Figure 16-14: Annual mining rate by pit

Scheduling Constraints

The constraints used to generate the schedule are presented in Table 16-7.

Page 180
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 16-7: Scheduling constraints

Constraint Description
Mining<br> Capacity In<br> most periods, the maximum mining capacity allowed in the schedule was calculated based upon<br> the existing mining equipment fleet. Each fleet’s available operating hours are based<br> on a calculation which includes units available, historical and projected mechanical availability<br> and use of availability, and utilization efficiencies.<br><br> <br><br><br> <br>In all periods, it is assumed that<br> only 20% of mill feed from the pit(s) will be direct-fed, with the remainder subject to rehandling at the primary crusher.
Sinking<br> Rate Depending<br> on the pit phase, a maximum sinking rate of nine 10 m benches per year was applied to planned mining areas. Generally, maximum sinking<br> rates are decreased in congested areas such as the bottom of the pit.
Stockpiles Four<br> stockpiles were used for mine scheduling: Purple (>2.0 g/t), Red (>1.5g/t),<br><br> <br>Blue (>1.1g/t), Green (>0.7g/t),<br> and Subgreen (>0.4g/t).

Mine Production Schedule

The distribution of equipment across the pits, phases, and benches results in variable production rates using the same fleet. As such, the total material moved varies year over year (Table 16-8). The mining schedule was optimized with a maximum of 45 Caterpillar 793D and five Hitachi EH-4000 haul trucks and a maximum of six Caterpillar 6060 shovels.

The mine production schedule (split by deposit) is shown in Table 16-8. WB4 is depleted in 2025, and stripping of the WB5 pushback is well under-way. The bulk of the WB5 orebody is reached in 2027, with significant quantities of very high-grade material coming out of the pit in 2028. A small section of the West Branch pit, called WB5 Extension, is planned in 2029-2030. Piment main and its satellite pits as well as Fennec satellite pit are continuously planned for mining throughout the schedule for supplementary plant feed to West Branch.

Page 181
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 16-8: MineProduction Schedule

Description LOM 2025 2026 2027 2028 2029 2030
Ore Mined (kt)
West Branch 31,428 3,239 4,400 6,431 9,656 4,356 3,346
Piment 19,254 3,191 2,946 1,271 910 5,914 5,021
Fennec 1,910 - 1,507 403 - - -
Total 52,592 6,431 8,853 8,104 10,566 10,271 8,368
Au Grade (g/t)
West Branch 2.00 1.83 1.20 1.67 2.71 2.22 1.50
Piment 1.59 1.61 1.79 2.02 0.94 1.34 1.75
Fennec 1.91 - 1.88 2.00 - - -
Total 1.84 1.72 1.51 1.74 2.56 1.71 1.65
Waste Mined (kt)
West Branch 191,369 51,056 57,058 47,551 19,891 6,046 9,768
Piment 133,981 15,166 9,210 17,089 38,090 42,246 12,179
Fennec 16,094 5,728 6,297 4,069 - - -
Total 341,444 71,950 72,565 68,709 57,981 48,292 21,947
Total Mined (kt)
West Branch 222,797 54,295 61,458 53,981 29,547 10,402 13,114
Piment 153,235 18,357 12,156 18,360 39,000 48,161 17,201
Fennec 18,004 5,728 7,804 4,472 - - -
Total 394,036 78,381 81,417 76,814 68,547 58,563 30,315

Notes:

1. Mine<br> production schedule does not include the 0.6-0.7 g/t Au material that is included in the<br> Reserves Statement. In future iterations, this material will be planned at the end of the<br> plant life, extending processing for an additional year.
2. Excludes<br> ore tonnes and gold ounces in starting stockpile mined before the start of 2025.
--- ---

The process plant currently operates at 24 kt/d, with the plant quickly ramping down in 2035 once all stockpile balances have been diminished. Table 16-9 shows the process plant feed schedule by year.

Page 182
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 16-9: CILprocess plant feed schedule

Description LOM 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
CIL Process Plant
Plant Feed (kt) 96,104 8,808 8,808 8,760 8,784 8,760 8,760 8,760 8,784 8,760 8,760 8,360
Head Grade (g/t) 1.48 1.88 1.81 1.75 2.38 2.38 1.88 0.91 0.88 0.81 0.79 0.78
Contained Au (koz) 4,573 531 512 493 672 672 528 256 249 228 222 209
Recovery 93 % 93 % 93 % 93 % 94 % 94 % 93 % 93 % 93 % 92 % 92 % 92 %
Produced Au (koz) 4,266 500 476 460 630 630 493 238 230 211 205 197

Notes:

1. Process<br> plant feed schedule includes ore tonnes and gold ounces mined before 2025, processed from<br> stockpile.
2. 2025<br> includes 7 koz of gold in circuit (GIC) drawdown to bring GIC levels in line with historical<br> operating levels.
--- ---
Page 183
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Once mining operations have been completed in 2031, the CIL plant will continue processing the low-grade stockpiles that will have developed over the mine life.

Stockpile Evolution

The stockpiles will be used in conjunction with the operating cut-off grade strategy to add value to the project and aid in sequencing the pit. Generally, the stockpiles will be reclaimed during periods where the material mined in the pit is of lower grade than the stockpiled material, however, the stockpiles are also planned to be reclaimed during the 2025-2026 periods due to the lower quantities of ore planned to be mined from the pits (during WB5 and PM stripping). Stockpile evolution over the LOM is presented in Figure 16-15.

Figure 16-15:LOM stockpile balances and depletion

16.4 Mine Equipment

Haulage Estimates

Selection of the mining equipment at Tasiast is based on the current mining fleet on site. The primary equipment fleet includes Caterpillar 6060 and Bucyrus RH340 excavators paired with Caterpillar 793D and Hitachi EH4000 haul trucks for the main pits (West Branch and Piment) and a Caterpillar 6030 excavator paired with Caterpillar 777 haul trucks for the satellite pits.

Page 184
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Payload sizes were estimated for the study, based on analysis of actual payloads. Payloads estimates were not varied by rock type or time and represent the average payload size expected, (Table 16-10).

Table 16-10:Payload sizes for planning

Truck Type Payload 2025+ (tonnes)
Caterpillar 793D 220
Hitchi EH-4000 220
Caterpillar 777 90

The LOM schedules provide details regarding the tonnages moved by material type and destination (i.e., waste dumps, ore stockpiles, primary crusher, TSF construction, etc.). During mine scheduling, haulage analyses were performed using Deswik software to estimate the required number of truck hours.

Haulage speed estimates used the speeds displayed in Table 16-11; these speeds have been benchmarked to reflect operating conditions at Tasiast. These speeds were applied for all haulage fleets.

Table 16-11:Haul truck speeds

Road Loaded Speed (km/h) Empty Speed (km/h)
Flat 30 35
Down Ramp 17 28
Up Ramp 12 22
Pit Bench Area 19 19
Dump Area 35 35

Complete cycle time estimates were calculated for each discrete pit cut to each required material destination. This cycle time estimate includes travel time, loading time, shovel spotting time, and dumping time. Loading time estimates are calculated using dig-rate estimates for the different primary loading units used in the mine plan. Variable dig rates are applied in oxide, transition, and fresh materials. These dig rates are used to calculate load times for paired trucks. Dig rate estimates are derived from current rates and are consistent with the site’s budget estimates. Dig rate estimates in tonnes per operating hour (t/h) are shown in Table 16-12 through Table 16-13.

Page 185
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 16-12:Loading unit planned productivities

Loading Unit Productivity<br> (t/hr) CAT6060<br> Shovel RH340<br> Excavator CAT6030<br> Shovel
Oxide 3,000 2,500 950
Transition 2,800 2,200 885
Fresh 2,800 2,200 885

Table 16-13:Front-end Loader (FEL) planned productivities

FEL Productivities<br> (t/hr) CAT994 CAT992
Stockpile/ROM Rehandle 1,000 800
Production 1,000 N/A

A fixed time allocation for dump time is applied to each haul cycle. The fixed non-travel time is based on current site data. Truck requirements and productivity by period were calculated based on the quantity of material moved and the cycle times associated with each material. The breakdown of the fixed cycle times is shown in Table 16-14.

Table 16-14:Breakdown of cycle time components

Activity (minutes) CAT 793D EH-4000 CAT 777
Loading Variable Variable Variable
Dumping 2.16 2.16 2.16
Total Variable Variable Variable

As the mine sequence progresses, the pit becomes deeper resulting in longer travel times to reach the pit exit point. Similarly, the primary waste dump destinations will be filled, and longer routes will be required to reach their higher dump elevations. The crusher location will remain fixed during the LOM. The net of these effects over time is that the average cycle time generally increases over the mine life. Figure 16-16 shows the average truck fleet requirement over the LOM (including stockpile reclaim). As this is the average annual figure, in some periods (months), peak required trucks could be different than these average figures. For instance, in Q1 2025 Tasiast will require 44 CAT-793 and four EH4000 trucks compared to 45 total required trucks in full year 2025.

Page 186
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 16-16:Annual hauling requirements

Loading Equipment Estimate

Estimation for the loading equipment requirements is based on the material movement specified in the LOM schedule and the estimated productivity rates. The productivity rates for the loading units are based on loading cycle times, bucket capacity, bucket fill factors, and historical productivity rates.

The fleet size was determined based on anticipated operating hours for the loading equipment and machine life estimates provided by equipment manufacturers, along with benchmarking data. The total fleet requirement was estimated by applying the percentage of mechanical availability and usage to the operating fleet requirements. Loading fleet requirements by year are shown in Figure 16-17.

Page 187
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 16-17:Loader requirements by year

Drilling Equipment Estimate

Blasting requirements determine the drill hole pattern size (i.e., burden and spacing) which provides the information to estimate the metres of drilling and hours required to achieve planned production. The plan assumes that the Sandvik DR580 and DR650i drills will be used predominantly for pre-split drilling, wall control holes in trim shots, and re-drill holes. The larger Bucyrus SKFX and Caterpillar MD6250drills will be used for ore and waste production drilling.

The blast design parameters and pattern designs match current practices at the site. Penetration rates for each drill by material type are illustrated in Table 16-15.

Table 16-15:Planned drill productivities

Drilling Rates Oxide<br><br> (m/hr) Fresh<br><br> (m/hr) Presplit<br><br> (m/hr)
DR580 & DR650i 30 24 21
SKFX 50 30
MD6250 42 38

The fleet size was determined based on estimated drilling hours, machine-life estimates provided by equipment manufacturers and benchmarking data. The total fleet requirements were estimated by applying percent mechanical availability and utilization to the operating fleet requirements.

Page 188
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Support Equipment Estimate

The mine equipment fleet will need various support equipment for constructing and maintaining roads, waste storage dumps ore stockpiles, and run-of-mine (ROM) pads. Support equipment fleet requirements depend on infrastructure maintenance requirements, and the number of shovels and excavators operating in the pit. Typically, these estimates were based on operating experience, and benchmarking data.

Tasks performed by auxiliary equipment include:

· Road<br> maintenance and construction
· Waste<br> dump maintenance
--- ---
· Cleanup<br> around excavators
--- ---
· Cleanup<br> of ore contact
--- ---
· Batter<br> trimming
--- ---
· Drainage<br> construction
--- ---
· Dewatering
--- ---
· Dust<br> suppression
--- ---
· Lighting
--- ---
· Servicing
--- ---
· Bulldozing<br> waste dump batters to final profile angle
--- ---
· Clearing<br> and topsoil stripping
--- ---

Costs and equipment hours for support tasks were not calculated in detail. Annual auxiliary equipment hours were estimated based on historical performance and benchmarking of operations with comparable material movement rates and mining equipment fleets.

A modular mining dispatch system with high-precision GPS is used for haul truck dispatching. Slope monitoring is carried out with portable slope radar and survey equipment.

Page 189
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
16.5 Personnel Requirements
--- ---

The current mine operation at Tasiast is owner-operated and applies conventional open- pit operational practices, with drilling, blasting, loading, hauling, support, and administrative functions. The mine operates 365 scheduled days per year and 24 hours per day, primarily divided into two 12-hour shifts per day for mine operations and maintenance.

The mine organization includes functional groups for mine operations (drilling and blasting, loading and hauling), maintenance, mine technology, and technical services (Table 16-16). The mine is staffed to support all operational, safety, and environmental requirements. Mining-related functional groups are organized under the mine manager or technical services manager. The mine manager is allocated functional groups for mine operations, maintenance, and technology. Among the functional groups responsible for mine operations, drilling and blasting are managed together, as are loading and hauling. The technical services manager oversees functional groups for technical services, including mine planning, survey, geology, and geotechnical services. The mine manager and technical services manager collaborate to manage mine operations.

Table 16-16 shows staffing levels for the mining area by functional group. Staffing levels remain relatively steady until the completion of WB5 in 2029 and then reduce significantly once mining is completed in 2030. A portion of the workforce remains operational during rehandling (and depletion) of lower grade stockpiles at the end of the mine life. Table 16-17 presents the levels of national and expatriate personnel at site.

Table 16-16:Mining personnel by function by year

Department 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Mine Operations 558 558 557 530 509 233 51 51 51 51 53
Mine Maintenance 365 365 364 359 358 165 23 23 23 23 21
Mine Technology 11 11 11 10 10 10 2 2 2 2 2
Technical Services 53 53 53 50 50 43 8 8 8 8 8
Geology 52 52 52 51 50 32 4 4 4 4 4
Mining Total 1039 1039 1037 1000 977 483 88 88 88 88 88
Page 190
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 16-17:National and expatriate mining personnel by year

Type 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Expatriates 13 13 11 5 3 2 0 0 0 0 0
Nationals (Admin) 138 138 138 137 137 121 33 33 33 33 39
Operators 572 572 572 545 524 232 38 38 38 38 35
Mechanics 316 316 316 313 313 128 17 17 17 17 14
Total 1039 1039 1037 1000 977 483 88 88 88 88 88
Page 191
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
17. Recovery Methods
--- ---

The Tasiast CIL plant has undergone multiple upgrades through the last decade. Since 2019, modifications have been made to increase the previous throughput of 15 kt/d (with the ‘12K’ flowsheet) up to the new standard of 24 kt/d, on average. The current flowsheet is detailed below.

17.1 Water Management

A brackish water bore field (known as “Sondage") provides raw water for the mine, CIL plant, and camp. The potable water requirements are met by three reverse osmosis plants.

For the initial 21 kt/d expansion, pumps at the existing Sondage pump station P1 will be upgraded. Pump stations, P2 and P4, will also be added along the existing 400DN PVC pipeline. For the 24 kt/d expansion, two additional pump stations, P3 and P5, will be added on the existing 400DN PVC pipeline as well. Each pump station will consist of a tank, operational and standby pumps, and ancillaries. Several additional wells will be added at the Sondage in order to provide additional capacity and flexibility for the operation.

The pumps supplying raw water to the CIL plant have been upgraded to improve reliability and meet the increased raw water consumption for the new 24 kt/d throughput.

Internal process water recovery from the thickener overflows, reclaimed water from the TSF, and recycled grey water from the camp are used to reduce the overall plant raw water requirements.

17.2 Gold Recovery

The CIL plant produces all the gold shipped from Tasiast. A Dump Leach with a dedicated adsorption, desorption, recovery (ADR) plant previously supplemented gold production but has since been shutdown. All produced gold is in the form of bullion and is transported regularly to a refinery for final refining and sale.

Unit gold recovery estimates for the CIL plant are based on metallurgical test work and a review of historical CIL plant performance.

17.3 Current CIL Processing Plant – The ‘24K New CIL’ Project

The Tasiast CIL plant was recently expanded in 2023 from a design throughput of 21 kt/d to the new design of 24 kt/d. In 2024, a new series of seven CIL tanks were commissioned to replace the historical ‘12K’ CIL tanks. The simplified process flowsheet for the current CIL plant is shown in Figure 17-1 where bolded equipment are modifications made for the ‘24K New CIL’ Project (‘24K’ Project) and grey equipment exists from the ‘12K’ and ‘21K’ projects. A simplified plant layout is shown in Figure 17-2.

Page 192
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Design Criteria

The design capacities for the crushing plant and process plant use 70% and 92% effective operating time, respectively. Based on test work and operating experience, the key nominal design criteria for the major process circuits are summarized in Table 17-1. It should be noted that design factors accounting for higher gold grades were applied when required to match the mine plan. The plant design life is 15 years.

Page 193
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 17-1:Simplified process flowsheet

Page 194
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 17-2: ‘24K New CIL’ Project plant layout

Page 195
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 17-1: Keyprocess design criteria

Area Criteria Unit Value
General Daily throughput t/d 24,000
Process plant availability % 92.0
Gold feed grade g/t 1-3
Primary crusher Availability and utilities % 70
Crusher work index kWh/t 14.6
ROM top size mm 1,100
Crusher<br> product size (P80) mm 150
Ore storage Capacity (live) t 15,000
Capacity (live) h 15
JKTech Axb - 31.4
Grinding and pebble crushing SAG<br> mill product size (P80) µm 160
Nominal fresh feed to SAG t/h 1,087
Bond Ball Mill work index kWh/t 13.3
Ball<br> mill product size (P80) µm 90
Gravity Recovery %Au feed 20 to 25
Pre-leach thickening Thickener diameter m 30
Underflow density % w/w 50
Leaching and CIL Leach residence time h 9
CIL residence time h 9
Total leach + CIL h 18
Tailings thickening Thickener diameter m 40
Underflow density % w/w 60
Carbon treatment Stripping solution flow rate BV/h 2
Operating temperature °C 140
Operating pressure kPa 450
Number of elution vessels - 2
Elution batch size t 7.5
Electrowinning & refining EW recovery % 98
Page 196
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Recent Plant Performance

Following throughput and recovery challenges during the expansion phases and ramp-ups, the CIL process plant’s performance improved through 2024 (Table 17-2) with daily tonnage reaching the plant’s new nominal daily throughput and recovery re-attaining the test work-derived recovery curve in Q4. The CIL gold recovery equation is presented in Table 17-3.

The start-up of the new CIL and realization of recovery-based improvement initiatives in Q4 contributed to the significant recovery increase.

Table 17-2: 2024CIL plant quarterly performance and recovery curve details

2024 <br><br> Quarter Tonnes<br> per day<br> (t/d) Process<br> plant overall gold recovery<br> (%)
Q1 22,782 91.3
Q2 23,742 91.8
Q3 23,953 91.2
Q4 23,968 94.3

Table 17-3: CILgold recovery equation

Process Au Recovery
CIL Recovery (Au-MAX(Au*(1-0.25)*(1-(1.6772*LN(Au*(1-0.25))+90.8)/100),0.04+0.015*(1-0.6)/0.6))/Au<br> ^1^

Notes:

1. Head<br> grade vs. recovery relationship develop from test work.
2. Au<br> = head grade, g/t.
--- ---

Primary Crushing

Mined ore above plant feed cut-off grade is transported from the open pits to the plant by truck and either deposited onto the ROM pad or directly dumped into a Gyratory Crusher. The primary crushing facility is shown in Figure 17-3.The material can be blended according to grade and competency.

Crushing of the mineralized material takes place in a single stage; a primary gyratory crusher that reduces rock to less than 210 mm, targeting a P80 of 125 mm.

The rock is conveyed to a coarse ore stockpile shown in Figure 17-4 that uses three apron feeders to feed the 40 ft SAG mill.

Page 197
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 17-3:Primary Crushing

Figure 17-4:Ore stockpile

Page 198
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Grinding Circuit

The SAG mill operates in closed circuit with a pebble crusher and a primary cyclone cluster (Figure 17-5). A SAG discharge vibrating screen was added as part of the ‘24K’ Project. Pebble circulating load varies from 5% to 20%, and cyclone circulating load from 150% to 250%. A portion of the primary cyclone underflow reports to the gravity circuit. The primary cyclone overflow pipe features an autosampler that contributes to the metallurgical accounting of the CIL plant.

Figure 17-5:SAG circuit – with new vibrating screen and cyclones installed in ‘24K’ Project

The Primary cyclone overflow, at a particle size P80 (80% passing) of 200 µm, is pumped to a pre-classification cyclone cluster. The cyclone overflow redirects the ‘slimes’, or finer particles at a size of P80 of 90 µm to a pre-leach thickener (previously the ‘12K’ tailings thickener). The pre-leach thickener underflow is routed to linear trash screens before feeding the leaching circuit, and the underflow reports to parallel ball mills. The ball mills are in closed circuit with cyclones. The cyclone overflow at target particle size P80 of 90 µm reports to trash screens that then feed the leaching circuit.

Page 199
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Gravity Recovery and IntensiveLeach Circuits

Two to six primary cyclone underflows report to two scalping screens that feed two Knelson concentrators for gravity recovery of coarse recoverable gold. The recovery from the gravity circuit ranges from 10% to 15% of the fresh feed to the SAG Mill. The equipment will be located on the east side of the grinding area (Figure 17-6).

Figure 17-6:Gravity Concentration and ILR

The gravity concentrate is collected and treated separately in a batch process by intensive leach reactors (ILR) where the gold is dissolved, and the resulting pregnant solution is pumped to the gold room for electrowinning and smelting. Most of the gravity circuit is relocated equipment from its former location at the ball mills.

Leaching Circuit

The leaching circuit at Tasiast includes six leach tanks and seven CIL tanks (Figure 17-7). Three tanks from the ‘12K’ Project are still in operation, with two additional leach tanks constructed and commissioned during the ’21’ Project, and a final new leach tank added with the ‘24K’ Project. The leach circuit is fed at a slurry density target of 50% solids by weight and has a residence time of 12 hours at nominal flow.

Page 200
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

The slurry flows by gravity through the leach tanks. The first leach tank can be used as a pre-aeration step with no cyanide addition and operate at the ‘natural’ pH of 8-8.5 produced by the grinding circuits. Lime is added to increase the slurry pH to 10.5 and sodium cyanide solution is added to maintain a target free cyanide concentration of approximately 250 ppm. High-pressure oxygen is sparged into the bottom of the leach tanks to enhance gold leaching kinetics. The leaching circuit’s purpose is to increase gold concentration in the solution before contact with activated carbon in the CIL circuit.

Figure 17-7:New Leach Tanks installed as part of the ‘21K’ and ‘24K’ Projects

The CIL tanks operate in a carbon-in-pulp (CIP) configuration but have retained the CIL naming convention due to historical operation as a CIL. As part of the ‘24K’ Project, seven new CIL tanks were built and commissioned in 2024. The seven new CIL tanks have a residence time of nine hours at nominal flow, bring the leach and CIL circuit total to 18 hours at nominal flow. In the CIL tanks, the dissolved gold in solution is recovered on activated carbon. Activated carbon granules contact slurry in the CIL tanks to adsorb the dissolved gold from solution. Carbon that has achieved the target gold content, ranging from 3,000 g/t to 5,000 g/t, is considered "loaded" and is transferred daily to the elution circuit for recovery of the gold on a batch basis. After each such transfer, carbon in the remaining tanks is advanced counter-current to the slurry flow on a sequential basis, and fresh or “barren” carbon is added to the last CIL tank to maintain the carbon inventory.

Page 201
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

After maximizing gold recovery from the solution and ore particles in the leaching circuit, the resulting slurry flows via carbon safety screens to the tailings thickener, where the solids settle to a target slurry density of 60% solids by weight, and thickener overflow is returned to the plant as process water.

Carbon Elution, Electrowinning,and Refining

Loaded carbon recovered from the slurry in the CIL circuit by screening is first water washed to remove entrained ore particles and then washed with hydrochloric acid solution in a dedicated acid wash vessel to remove inorganics from the carbon surfaces. After being neutralized, the acid-washed carbon is transferred to the elution pressure vessel. To recover gold from the loaded carbon, batches of approximately 7.5 t of carbon are subjected to a high pressure and temperature, stripping process, called elution. Tasiast uses the Anglo American Research Laboratories (AARL) strip process. A hot caustic and cyanide rinse under pressure removes the gold from the carbon and into solution. After gold removal, the "barren" carbon is transferred to a regeneration kiln for thermal reactivation of the carbon. Reactivated carbon is returned to the last CIL tank.

Gold is recovered from the caustic solution by electrowinning onto stainless steel wire wool cathodes in electrowinning cells, located within the Gold Room. Two additional electrowinning cells were added as part of the ‘21K’ Project. The gold is removed as a sludge by pressure washing the cathodes at intervals. The sludge is dried and mixed with fluxing materials and charged to a diesel-fired crucible furnace. After melting, the slag is poured and followed by pouring the gold into bullion moulds. Bullion, or doré, contains approximately 94% or higher gold content together with a minor content of silver. The doré bars are transported by a security firm to a commercial refinery for further purification and sale.

Tailings Thickening

Slurry from the last CIL tank is pumped through carbon safety screens for the recovery of fine carbon, which feed a tailings thickener. The 40 m diameter tailings thickener increases the slurry density of the CIL circuit tails from 50% to approximately 60% solids by weight and recovers process water via its overflow. The safety screens and thickener were added in the ‘21K’ Project. The transfer line from the carbon safety screens underflow to the tailings thickener feed features an autosampler that contributes to the metallurgical accounting of the CIL plant. The layout of the tailings thickener is shown in Figure 17-8.

Page 202
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Figure 17-8:New Tailings thickener

Tailings Storage Facility

Slurry at the tailings thickener underflow is treated with a ferrous sulfate solution to detoxify the residual cyanide before being pumped to the TSF via a tailings pipeline. An intermediate tailings pumping booster station (TP3) allows transport of the slurry to different deposition points in the TSF. After settling of the solids, a portion of the contained water drains to a collection area within the storage basin, from there it is returned to the plant process water system as reclaim water. Solids are retained in the TSF.

The tailings pipeline and the reclaim water line are contained in a trench connected to five existing emergency ponds. In case of emergency or a prolonged shut down period, tailings slurry can be discharged into these ponds by operating the manual valves provided to prevent line blockage. The tailings pipeline design includes flushing points at regular interval along the length of the line to the TSF for manual line flushing. This is achieved by connecting a flushing hose between the slurry line and the duty tailings return water line.

Page 203
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Solution and Slurry Containment

All wet areas of the process plant will be bunded with a containment volume equal to 110% of the volume of the largest tank in the containment area, or 25% of the total combined tank volume in the case of hazardous materials.

Areas with specific requirements (design code requirements or incompatibility of solutions, such as hydrochloric acid and sodium cyanide) will be provided with separate containment.

The CIL plant is designed and operated to International Cyanide Management Code (ICMC) standards.

Utilities

Water Distribution

· Process water: The overflow of the thickeners (tailings and pre-classification thickeners) returns<br> process water to the process water ponds, which is then repumped to the plant. Three process<br> water pumps supply the process water circuit of the CIL plant.
· Raw water: Raw water is stored in two raw water ponds within the plant boundary. A new pumping<br> station of two pumps (one operating and one standby) was installed for the ‘24K’<br> Project. The pumps feed a raw water distribution network throughout the plant. Piping allows<br> flushing of the unused lines back to the ponds.
--- ---

Oxygen

The CIL plant features four vacuum swing adsorption (VSA) oxygen generation modules – three installed during the ‘12K’ Project with a fourth installed for ‘21K’ – and a recently installed portable pressure swing adsorption (PSA) containerized unit of five ‘mini’ modules. The VSAs and PSA are designed for an oxygen supply of 200 Nm^3^/hr to 250 Nm^3^/hr per unit at 93% purity. Oxygen is supplied at low or high pressure via dedicated booster compressors, with high pressure oxygen supplied to the bottom of the leach tanks via SlamJet spargers.

Reagent Mixing and Storage

Sodium Hydroxide (Caustic)

The ‘12K’ sodium cyanide mixing and distribution system was converted to become the sodium hydroxide mixing and distribution system during the ‘21K’ Project. The pumps from the previous system were relocated, and a previous cyanide transfer pump was retained for supplying caustic solution to the gravity recovery circuit.

Page 204
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Sodium Cyanide

A new sodium cyanide facility was constructed during ‘21K’ (Figure 17-9). Sodium cyanide is supplied in one tonne boxed bags as solid briquettes and dissolved in treated water to make a 20% w/w solution in the 50 m^3^ mixing tank. Sodium hydroxide is added to safely dissolve the solid sodium cyanide in a high pH solution. During dissolution, the solution is maintained at a pH greater than 12 to avoid volatilization of hydrogen cyanide gas. The cyanide is pumped into a ring-main, and a dedicated pump services the gravity recovery circuit.

Figure 17-9:Sodium cyanide mixing layout

Page 205
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
18. Project Infrastructure
--- ---
18.1 Water Supply
--- ---

Raw water for the Tasiast site is supplied from a bore field which is located 64 km west of the Complex, and draws from a brackish aquifer using a system of 47 boreholes. Individual well yields range from 265 m^3^/d to 1,080 m^3^/d based on 2024 production pumping. Three separate well areas are combined in a manifold for each area and fed to a primary pumping station located at a facility referred as the Sondage. Water from the Sondage is transported to site via pipelines with intermediate booster stations. The Sondage can supply the site with up to 19,800 m^3^ of raw water per day.

The Tasiast permit, issued May 7, 2017 by the Ministry of Hydraulics and Sanitation, allows abstraction at a maximum rate of 30,000 m^3^/d through to December 31, 2034. Modelling done by Piteau Associates, and calibrated against monitoring data, confirms the Sondage can be operated at this maximum rate and continue to meet the permit conditions.

Reverse osmosis (RO) water treatment plants and storage basins/tanks are located at the Complex. Saline water produced from the RO plant is used to water the haul roads or used in processing. Potable water is produced from RO water following additional disinfection steps and is used in certain processing applications as well as domestic purposes.

18.2 Power Supply

Electric power is provided by the following installed generation equipment:

· The<br> solar plant consisting of 78,000 550W JA Solar Bifacial photovoltaic panels capable of generating<br> up to 34 MWe and a battery system of 18 MWe.
· The<br> Phase 2 plant consisting of four Wärtsilä W20V32TS simple cycle, medium speed,<br> reciprocating engines (heavy fuel oil as primary fuel and light fuel oil as back-up) with<br> a total capacity of approximately 40 MWe.
--- ---
· The<br> Phase 1B plant consisting of four Wärtsilä 12V32 medium speed generator sets (heavy<br> fuel oil as primary fuel and light fuel oil as back-up), with a total capacity of approximately<br> 19 MWe.
--- ---
· The<br> Phase 1 plant consisting of seven light fuel oil Caterpillar 3512 MUI high-speed generator<br> sets and three heavy fuel oil Caterpillar MaK 6CM32C medium-speed generator sets, with a<br> total capacity of approximately 14 MWe.
--- ---
Page 206
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
· The<br> Tasiast Team Village (TTV) plant consisting of seven light fuel oil MTU Model 16V40000G23<br> high-speed generator sets, with a total capacity of 9 MWe.
--- ---

All of Tasiast’s power plants are interconnected and able to feed onto the 33 kV islanded distribution grid to supply the required site loads. The average demand is 40 MWe to 45 MWe, which is supplied by the combination of the approximately 82 MWe of thermal generation capacity and supplemented by an approximate 20% contribution from the solar plant based on daily and seasonal radiation availability.

The combined plants have the ability to meet the required net peak power demand at any expected ambient condition, while accounting for equipment fouling, ageing, power plant parasitic loads, as well as spinning reserve requirements. The combined facility has sufficient redundancy to be able to meet the maximum site power demand with the loss of availability of generating capability considering both scheduled and forced maintenance.

The power plants operate 24 hours per day, seven days per week and 365 days per year as an islanded operation.

18.3 Waste Management

Waste from plant and equipment maintenance, construction, offices, kitchens, and accommodation are processed at the waste management facility where materials are sorted for reuse, recycling, or incineration. Composters are also used in the camp to process food waste into compost for use in tree planting initiatives.

Sewage is collected and pumped to the wastewater treatment plant with treated effluent recycled back into the process or reused in road watering or vegetation projects. In remote locations septic tanks and leach beds are used.

18.4 Tasiast Team Village

The TTV is sized to accommodate a workforce of 3,540 personnel. It includes various facilities, such as clinic, laundry, kitchen and dining areas, gymnasiums, recreational rooms, and various sports fields.

18.5 Service and Administration Buildings

Service and administration buildings include:

· Guardhouse
· Warehouses
--- ---
Page 207
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
· Kitchen<br> and dining hall
--- ---
· Plant<br> office building
--- ---
· Security,<br> Human Resources, General Management, IT, health, safety, and environment (HSE), and<br> Site Services offices
--- ---
18.6 Accessibility
--- ---

The Tasiast Lands are accessed from Nouakchott by using the paved Nouakchott to Nouadhibou highway for 370 km and then via 66 km of graded mine access road which is maintained by TMLSA. An airstrip at the Complex is used for light aircraft, primarily travelling to and from Nouakchott.

The principal ports of entry for goods and consumables are either Nouakchott or Nouadhibou. Materials are transported by road to the Complex site.

Access to the major urban centres of Mauritania is also possible via air. Nouakchott is accessible via international flights operated by numerous West and North African carriers; Air France also provides a direct connection to Paris.

Page 208
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
19. Market Studies and Contracts
--- ---

Kinross typically establishes refining agreements with third parties for refining of doré. Kinross’s bullion is sold on the spot market or as doré, by marketing experts retained in-house by Kinross. The QP is of the opinion that the terms contained within the refining contracts and sales contracts are typical and consistent with standard industry practice and are similar to contracts for the supply of bullion and doré elsewhere in the world.

Page 209
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
20. Environmental Studies, Permitting, and Social or Community Impact
--- ---
20.1 Environmental Studies
--- ---

Current mine operations and the ‘24K’ Project are based on the formal approval of a number of Environmental Impact Assessment (EIA) studies completed before and since mine commissioning in 2007.

For all deposit areas, environmental baseline conditions have been determined by reviewing existing published data, previous EIAs, satellite imagery, and environmental reporting undertaken for the Complex. Where appropriate, existing data for deposit areas was supplemented by primary data collected through environmental baseline surveys. Field-level baseline surveys were completed for deposit areas, including air quality, archaeology, flora, fauna, marine, water quality, traffic, and socioeconomics.

The baseline conditions formed the basis to assess the project through a series of EIAs and Environmental Impact Notices (EINs). The environmental assessments used applicable Mauritania legislation, the International Finance Corporation Performance Standards, the International Cyanide Management Code, and Kinross Health, Safety, Environment and Social Management Systems for project design and management, mitigation strategies, and performance monitoring. The environmental assessments determined appropriate mitigation and management where impacts could not be avoided through project design.

A geochemical review of waste rock, based on historical laboratory data, indicates excess neutralizing capacity, suggesting a low potential for ARD. Given this capacity and the minimal precipitation at Tasiast, ARD is unlikely. Additional test work is planned to corroborate these findings at depth, as the initial studies were based on samples collected before 2015.

The Tasiast facilities operate under an environmental management system (EMS) that specifies activities to be planned and implemented by the Complex’s environmental management team. The EMS incorporates the project design and management, mitigation strategies, and performance monitoring commitments outlined in the environmental assessments, applicable legislation, and specific permit requirements.

Page 210
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

An element of each EIA prepared for the Tasiast Mine site is a preliminary reclamation and closure plan and associated cost estimate. The preliminary reclamation and closure plan outlines the measures that will be taken to reclaim and close the proposed activities assessed in each EIA. The preliminary reclamation and closure cost estimate forms the basis of the financial assurance. Tasiast, with the support of the SRK, updated its financial assurance in 2024 including the 24,000 kt/day expansion. The estimated closure cost is approximately US$64 million. This financial assurance will be submitted to the Mauritanian regulators for their review and approval in February 2025. Once the government of Mauritania validates the assurance, Tasiast will issue a new letter of credit that reflects the remaining amount, taking into account the existing financial assurance of US$6.2 million. At least two years before entering closure, a detailed reclamation and closure plan must be submitted to the appropriate ministries for approval.

20.2 Permitting

In addition to the exploitation permit No. 229C2 (Section 4.2) and the adjacent exploitation permits, all other necessary permits for exploiting the Tasiast Complex have been granted by the relevant Mauritanian authorities. A Phase 3 EIA for “off-site” sea water supply was approved in 2014 following submission of a Phase 3 addendum. A subsequent EIA was approved to allow receipt of pre-assembled equipment at a beach landing and transportation to site. In addition, following discussion with the Government, an addendum to the Phase 2 EIA was submitted and approved that described the project optimization through incremental increases in production and relocation of certain infrastructure. This addendum was approved by the Ministry of Environment in February 2016 and the Ministry of Mines in March 2016. An authorization for the installation of 15 additional wells at the Sondage was received from the Mauritanian government on September 21, 2020. Meanwhile, Tasiast is working on a new Environmental Impact Assessment (EIA) for the northern satellite pit, known as the Fennec project, intending to complete the process within the second quarter of 2025. The key permits are shown in Table 20-1.

Page 211
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 20-1: Key operatingpermits and environmental assessments

Brief Name Issue Date
Authorization<br> to construct a water pipeline route to the mine MMI<br> Letter 090 – 23 May 2006
Authorization<br> of water extraction (12 boreholes) MHE<br> Letter 560 – 24 July 2008
Original<br> EIA permit for Tasiast Mine MEDD<br> Letter 407 – 27 August 2009<br><br> <br>MIM Letter 264 – 27 August 2009
New<br> developments EIA permit (dump leach, TSF2) MEDD<br> Letter 408 – 27 August 2009<br><br> <br>MIM Letter 264 – 27 August 2009
Groundwater<br> abstraction permit for 30,000 m^3^ per day MHA<br> Letter 125 – 25 April 2011
Environmental<br> authorization for Phase 1ai and Phase 1aii environmental impact<br><br> <br>notices MEDD<br> Letter 151 – 16 June 2011<br><br> <br>MEDD Letter 166 – 10 July 2011
Environmental<br> authorization for West Branch development (EIA) MEDD<br> Letter 665 – 10 October 2011<br><br> <br>MPEM Letter 1209 – 25 October 2011
Environmental<br> authorization for Phase 1b development (EIA) MEDD<br> Letter 713 – 18 October 2011<br><br> <br>MPEM Letter 1210 – 25 October 2011
Environmental<br> authorization for Phase 2 development (EIA) MEDD<br> Letter 556 – 19 July 2012<br><br> <br>MPEM Letter 1049 – 25 July 2012
Conditional<br> environmental authorization for Phase 3 development (EIA) MEDD<br> Letter 600 – 22 September 2013<br><br> <br>MPEM Letter 844 – 6 October 2013
Extension<br> of groundwater abstraction permit for 30,000 m^3^ per day until 2020 MHA<br> Letter 6 – 7 January 2014
Addendum<br> Phase 3 EIA, full authorization for Phase 3 MEDD<br> Letter 605 – 21 June 2014<br><br> <br>MPEM Letter 751 – 31 July 2014
Beach<br> Landing EIA AZFN<br> Letter 2 – 13 January 2014
Addendum<br> Phase 2 and Environmental Authorization MEDD<br> Letter 59 – 4 February 2016<br><br> <br>MPEM Letter 276 – 30 March 2016
Extension<br> of groundwater abstraction permit for 30,000 m^3^ per day until 2034 MHA<br> Letter 94 – 9 May 2017
Authorization<br> for drilling of 15 new wells for Tasiast Sondage MHA<br> letter 149 – 21 September 2020
Construction<br> of Tasiast solar PV plant permit MEDD/DECE<br> Lettre 150 – 14 April 2022

Note:

1. MMI = Ministère des Mines et de l'Industrie
2. MHE = Ministère de l'Hydrqulique et de l'Energie
3. MEDD = Ministère de l'Environnement et du Développement Durable
4. MIM = Ministere de l'Industrie et des Mines
5. MHA = Ministère de l'Hydraulique et de l'Assainissement
6. MPEM = Ministère du Pétrole, de l'Energie et des Mines
7. AZFN = Autorité de la Zone Franche de Nouadhibou
Page 212
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
20.3 Socio-Economics
--- ---

Mauritania is divided into 12 wilayahs (regions), one district (Nouakchott), 53 moughataas (counties), and 208 communes (municipalities).

The Complex is located in the Inchiri wilayah, which has a very low population density. The wilayah includes the Akjoujt moughataa and two main municipalities, Akjoujt and Bennichab, Akjoujt being the administrative capital with a population of approximately 8,500. The wilayah is administered by a council, directed by a governor (wali) who reports to the Minister of Interior. The basic administrative unit, the moughataa, is directed by a prefect (Hakem) who exercises his power under the authority of the governor.

Inchiri is the least populated wilayah in the country, with the nomadic way of life being a key feature making up 20% of the total population. There tends to be a small number of nomadic people in the vicinity of the Tasiast Complex. The Complex is located 80 km northeast from the nearest permanent community of Chami.

The nearest industries to the site are in the towns of Chami, Boulanour, Akjoujt, and Bennichab, which are respectively 80 km southwest, 120 km northwest, 150 km east-southeast and 130 km southeast from the site.

There are no permanent settlements within the vicinity of the Complex, however, a number of isolated families have set up structures within 30 km of the site and reside, predominantly within three communities. Residents practice animal husbandry and other subsistence forms of livelihood. There are also nomadic groups that occasionally transit the area.

Page 213
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
21. Capital and Operating Costs
--- ---

This section covers Capital and Operating Costs for the Tasiast Mine.

21.1 Capital Costs

Capital costs for Tasiast are summarized in Table 21-1 and Table 21-2 and show sustaining capital and non-sustaining capital, respectively.

After the completion of the ‘24K’ Project in 2023, go-forward capital costs are largely comprised of:

· Non-sustaining<br> capitalized development for West Branch 5 stripping and non-sustaining equipment maintenance<br> (Table 21-1).
· Sustaining<br> capital requirements across the Complex site (maintenance, tailings, mill, etc.) (Table<br> 21-2).
--- ---

Capital costs are higher earlier in the remaining mine life, primarily due to the up-front investment from West Branch 5 [and Piment] waste stripping, maintenance strategies to optimize maintenance capital, and tailings capital being spent ahead of deposition.

Capital costs are estimated on a real basis, using January 1, 2025 dollars to estimate, and reflect the delivered cost of any equipment.

Page 214
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 21-1: Annual sustainingcapital

Sustaining<br> Capitalized<br> Stripping Mining<br> Sustaining<br> Capital Mill<br> Sustaining<br> Capital Tailings<br> Sustaining<br> Capital Other<br> Sustaining<br> Capital
Year (US million) (US million) (US million) (US million) (US million)
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
Total

All values are in US Dollars.

Page 215
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 21-2: Annual non-sustainingcapital

Non- Sustaining<br> Capitalized Stripping Mobile Equipment<br> Maintenance Non-Sustaining Capital Other Non-<br> Sustaining Capital
Year (US million) (US million) (US million)
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
Total

All values are in US Dollars.

21.2 Estimate Basis – Non-sustaining and Sustaining Capitalized Stripping

Stripping costs, which provide future economic benefits and identifiable improved access to the orebody, can be capitalized. Estimates for capitalized stripping are the pro-rated mining cost within each period, spread based on operating vs. capitalized tonnes mined.

Capitalized mining cost is built up using a zero-based operating cost model, constructed in XERAS software platform. This uses forward-looking estimates for the key cost drivers and are supported by contractual agreements, 2025 labour rates, actual consumable prices and rates, and a detailed mine plan schedule to build up the cost drivers, such as tonnes mined, equipment hours, etc.

Per World Gold Council guidance, the capitalized portion of West Branch waste movement is considered non-sustaining LOM, as it exposes long-term ore sources. Piment and Fennec waste stripping is considered sustaining capital, due to the smaller pit sizing and shorter duration of stripping.

Page 216
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
21.3 Estimate Basis – Non-sustaining and Sustaining Mobile Equipment Maintenance
--- ---

Mobile equipment maintenance costs include fleet purchases, planned component replacements of major fleets, and the capitalized portion of maintenance spend for the mobile fleet of equipment.

Planned fleet purchases include some replacement capital over the LOM, including two CAT 793 haul trucks and other support equipment. Furthermore, to support mining at the Fennec and Prolongation satellite pits, a small fleet of equipment is planned for purchase in early 2025 , including:

· eight<br> CAT 777 haul trucks
· one<br> CAT 992 loader
--- ---
· one<br> CAT 6030 shovel
--- ---
· two<br> CAT D10 dozers
--- ---
· two<br> CAT 16M graders
--- ---
· Other<br> miscellaneous support equipment
--- ---

Capitalized maintenance spend reflects a detailed maintenance cost forecast. This involves zero-based logic to calculate the timing of the key maintenance events over the life-of-mine. Key inputs include:

· 2025<br> opening balance component hours
· Expected<br> component life
--- ---
· Delivered<br> component pricing
--- ---

The maintenance model is predicated on a run-to-failure maintenance strategy, where work is assumed to reduce towards the end of the mine life, not conducting major capital component replacements in the final stages of the mine life. This is to ensure a more capital efficient approach to the mine.

21.4 Estimate Basis – Mill Sustaining Capital

Capital spending in the mill is largely routine in nature without any major upgrades or replacements planned in the LOM. Routine spending includes planned equipment and component replacement to maintain the plant and deliver the planned availability.

Page 217
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
21.5 Estimate Basis – Tailings Sustaining Capital
--- ---

The active TSF is a combined facility, TSF 4/5. Based on planned dam raises to the facility, the TSF can meet the required LOM tailings capacity. The TSF is a rectangular-shaped ring embankment with a downstream construction method.

The tailings sustaining capital estimate is primarily for dam raises constructed at approximate two to three year intervals through the remaining mine life. The estimate is based on a combination of contractor quotes and site experience with construction of past dam raises. The main cost components are zoned earthfill placement and geomembrane installation (by contractors) and construction of the downstream rock fill dam shell, which is self-performed using mine mobile equipment.

21.6 Operating Costs

Basis of Estimate – Operating Costs

The Tasiast LOM operating costs are split into five primary categories: Mining, Processing, Site Administration, Royalties, and Other. See Table 21-3 for a summary of the basis of estimate for these categories.

Operating costs are estimated on a real basis, using January 1, 2025 dollars. Approximately 50% of LOM operating costs are based on the Mauritanian Ouguiya, with the remaining 50% exposed to US Dollars.

Labour rates are estimated using existing role profiles and labour rates at Tasiast, adjusted for 2025 dollars moving forward. Consumables prices generally reflect a combination of current pricing, and near-term projections for some major global indices (i.e., caustic, ammonia, etc.), which have been provided by specialized third party advisors.

Operating costs have been adjusted downwards beyond 2030 to reflect the reduced scale of operation that would come from just stockpile rehandling and processing. This reflects assumptions around limited load/haul requirements from stockpile and associated reductions in other cost drivers like headcount, processing fixed costs, etc.

Page 218
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Table 21-3: Basis of estimate – operatingcosts

Operating CostCategory Estimate Basis
Mining Developed from first principles by:<br><br> <br>·      Developing<br> a detailed mine plan schedule.<br><br> <br>·      Defining<br> a haulage network (specific to the detailed mine plan) and generating truck hours based on travel distance, speed, and fixed non-travel<br> time.<br><br> <br>·      Applying<br> key cost parameter inputs such as:<br><br> <br>o      Input<br> prices (diesel, blasting consumables and tires) from existing site contracts.<br><br> <br>o      Productivity<br> – rates have been baselined to existing productivity rates on-site.<br><br> <br>o      Headcounts<br> – fitted to the scale of the mine (i.e., fewer operator and non-operator positions would be required as mining rate decreases).<br><br> <br>o      Fuel<br> burn rates – based on expected LOM fuel burn rates, baselined to actual levels.<br><br> <br>o      Maintenance<br> costs, calculated from a zero-based maintenance model (tracks and schedules maintenance events for each piece of equipment at site by<br> operating hours).<br><br> <br>o      Other<br> inputs, such as tire life and drill consumption rates – based on existing site strategy and experience.<br><br> <br>The following costs are allocated by department<br> and based on actuals adjusted for changes in mining headcount and rates:<br><br> <br>·      Tasiast<br> Team Village (camp).<br><br> <br>·      People<br> mobility.<br><br> <br>·      Nouakchott<br> accommodations.<br><br> <br>·      Power.<br><br> <br>·      Water.
Processing Estimation methodology varied by cost component,<br> but primarily built from<br><br> <br>first principles, relying on a combination of:<br><br> <br>·      Knowledge<br> from existing operations.<br><br> <br>·      Laboratory<br> testing.<br><br> <br>·      Energy<br> consumption estimates per motor.<br><br> <br>·      Mass<br> and water balance.<br><br> <br>Major categories include the following:<br><br> <br>·      Power.<br><br> <br>·      Consumables<br> (i.e., liner, grinding balls).<br><br> <br>·      Reagents.<br><br> <br>·      Labour.<br><br> <br>·      Maintenance.<br><br> <br>·      Water.
Page 219
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
Operating CostCategory Estimate Basis
--- ---
·      Laboratory.<br><br> <br>·      Plant<br> administration.<br><br> <br>The following costs are allocated by department and based zero-based<br> models, which calculate power supply cost, camp costs, etc.:<br><br> <br>·      Tasiast<br> Team Village (camp).<br><br> <br>·      People<br> mobility.<br><br> <br>·      Nouakchott<br> accommodations.<br><br> <br>·      Power.<br><br> <br>·      Water.
Site<br><br> <br>Administrative Bottom-up approach applying labour, and other costs to various areas<br><br> <br>including:<br><br> <br>·      Administration<br> (finance, supply chain, security, IT, HR, etc.)<br><br> <br>·      Insurance.<br><br> <br>·      Heath,<br> safety and environment.<br><br> <br>·      Training.<br><br> <br>·      Site<br> services.<br><br> <br>·      Refining<br> and shipping costs.<br><br> <br>The following costs are allocated by department and based on zero-based<br> models, which calculate power supply cost, camp costs, etc.:<br><br> <br>·      Tasiast<br> Team Village (camp).<br><br> <br>·      People<br> mobility.<br><br> <br>·      Nouakchott<br> accommodations.<br><br> <br>·      Power.<br><br> <br>·      Water.
Royalties This category captures royalties paid by the mine:<br><br> <br>·      Franco<br> Nevada Royalty (2.222% of production).<br><br> <br>·      Price<br> dependent government royalty as follows:<br><br> <br>Au Price < $1,000/oz 4.0% of Revenue<br><br> <br>Au Price $1,000/oz ≤ Au Price < $1,200 4.5% of Revenue<br><br> <br>Au Price $1,200/oz ≤ Au Price < $1,400 5.0% of Revenue<br><br> <br>Au Price $1,400/oz ≤ Au Price < $1,600 5.5% of Revenue<br><br> <br>Au Price $1,600/oz ≤ Au Price < $1,800 6.0% of Revenue<br><br> <br>Au Price > $1,800 6.5% of Revenue
Other This category captures all operating costs not considered in the three<br> categories above, including:<br><br> <br>·      World<br> Gold Council fee.<br><br> <br>·      Training<br> and development spend
Page 220
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Operating cost estimates are not escalated over time and all estimates are on a real basis. LOM operating cost estimates are shown in Table 21-4.

Table 21-4: Operating cost estimates (January 1,2025 forward)

Operating Cost Unit 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 LOM 2025-2035
Mining US$/t mined 3.9 3.9 3.9 3.6 3.5 4.2 0.0 0.0 0.0 0.0 0.0 3.8
Processing (Mill) US$/t processed 16.2 15.7 15.9 15.1 15.0 14.7 13.6 13.2 13.4 12.8 12.7 14.4
Site Admin million US$/a 112 106 101 98 96 75 41 41 34 30 17 754
Royalties US$/oz sold 186 187 188 187 187 187 187 187 187 187 187 187
Other US$/oz sold 2.2 2.3 2.3 1.7 1.7 2.2 4.4 4.6 5.0 5.1 2.2 2.6
Operating<br><br> Cost Unit 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 LOM<br><br> 2025-2035
--- --- --- --- --- --- --- --- --- --- --- --- --- ---
Mining<br> (incl. capitalized stripping) million<br> US$/a 304 316 296 247 205 126 21 19 25 25 19 1,602
Processing<br> (Mill) million US$/a 142 138 140 133 132 129 119 116 117 112 106 1,384
Site Admin million US$/a 112 106 101 98 96 75 41 41 34 30 17 754
Royalties million US$/a 92 87 85 115 115 90 44 42 39 38 35 782
Other million US$/a 1 1 1 1 1 1 1 1 1 1 0 11
Page 221
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
22. Economic Analysis
--- ---

Under NI 43-101 guidelines, a producing issuer may exclude the information required for Item 22 – Economic Analysis on properties currently in production for a case that does not include a material expansion of current production. Kinross is a producing issuer, the Tasiast mine is currently in production, and the current LOM does not consider a material expansion. Kinross has carried out an economic analysis of the LOM case consistent with technical information in this Technical Report and confirms that the outcome is a positive cash flow.

Page 222
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
23. Adjacent Properties
--- ---

To the north of the Tasiast property, SENISA, a sister company of TMSLA, holds two mining permits that are contiguous wit the Tasiast mining permit land. There are exploration prospects in all three exploitation permit locations.

Page 223
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
24. Other Relevant Data and Information
--- ---

No additional information is necessary for this Technical Report.

Page 224
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
25. Interpretation and conclusions
--- ---
· Tasiast<br> is viewed as a long-term strategic asset for Kinross, located in a district that is believed<br> to have significant future potential.
--- ---
· The<br> Tasiast gold deposits fall into the broad category of orogenic gold deposits. Tasiast gold<br> deposits are hosted in Archaean volcanic-sedimentary sequences that have been deformed and<br> metamorphosed to lower amphibolite peak metamorphic grade. Mineralization is both structurally<br> and lithologically controlled and is epigenetic in style.
--- ---
· The<br> Complex is currently operated as an open pit. Mineral Resources include both open pit and<br> underground conceptual scenarios.
--- ---
· There<br> is a good understanding of the geology and the nature of gold mineralization at the Complex.<br> The lithology model represents the support data well and it is developed using appropriate<br> resolution.
--- ---
· The<br> Mineral Resource estimate is of sufficient quality to support public disclosure and is supported<br> by best practice guidelines.
--- ---
Page 225
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
26. Recommendations
--- ---
1. Foster the already-strong Continuous<br> Improvement culture, looking for further opportunities to improve operating and cost performance<br> in the mine, plant, and administration. In particular, focus on opportunities to add production<br> to the 2025 to 2027 window while stripping is ongoing at West Branch 5.
--- ---
2. Continue to explore the underground potential<br> at Tasiast. High potential exists to continue to expand upon underground resources at Tasiast<br> at West Branch and Piment but also to establish underground higher-grade resources at Prolongation.
--- ---
3. Evaluate further push backs at West Branch<br> and other open pits given the elevated gold price environment.
--- ---
4. Evaluate opportunities to strategically<br> stockpile lower grade material, which could be processed at the end of the mine life in a<br> higher metal price environment. Furthermore, this lower grade material could be used to keep<br> the mill full, if successful in converting the current underground resource. At YE 2024,<br> Tasiast added 152 koz of low grade which will be stockpiled for the end of mine life. Future<br> mine plans should look to add this to the back end of mine life, as well as evaluate other<br> opportunities.
--- ---
5. Continue to explore the addition of other<br> satellite ore bodies to the mine plan such as C67 and C68. The recent addition of Fennec<br> to the mine plan highlights the success that can come from detailed technical review of some<br> of these higher-grade satellite opportunities.
--- ---
6. Given the positive reconciliation of<br> 106% on F3 ounces seen in 2024, continue to drill targeting higher grade plunge controlled<br> mineralization in the West Branch 5 push back.
--- ---
Page 226
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
27. References
--- ---

Blake, C., 2011a. Mineralogical characterisation of five gold-bearing samples from the Tasiast mine, Mauritania for Kinross Gold Corporation. Internal unpublished report, February 2011.

Blake, C., 2011b. Mineralogical characterisation of seven gold-bearing composite samples from the Tasiast Mine, Mauritania for Kinross Gold Corporation. Internal unpublished report, September 2011.

Canadian Institute of Mining, Metallurgy and Petroleum (CIM), 2014. CIM Standards for Mineral Resources and Mineral Reserves, Definitions and Guidelines: Canadian Institute of Mining, Metallurgy and Petroleum, May 10, 2014 (CIM (2014) Definitions).

Chartier, D., 2013. Draft of Sampling and Data Verification Sections for Tasiast Feasibility Study, memo dated December 4, 2013.

CIM, 2019. CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines, adopted by the CIM Council on November 29, 2019 (MRMR Best Practice Guidelines).

Davis, B., 2018. Tasiast gold deposit, Mauritania – A structural geological review. Kinross Gold Corporation.

Demers, P., Gauthier, D., Kroon, A.S., and Lafleur P-J., 2004. Technical Report on the Tasiast Gold Project, Islamic Republic of Mauritania: unpublished technical report prepared by SNC Lavelin for Defiance Mining Corporation Limited, effective date May 27, 2004.

Fabre, J., 2005. Géologie du Sahara occidental et central. Série/Reeks: Tervuren African Geosciences Collection, MRAC Tervuren, Belgique, p. 572.

Golder Associates, 2004. Preliminary Pit Slope Design, Tasiast Project, Mauritania, Report 03- 117-073. Unpublished Technical Report, June 2004.

Golder Associates, 2014. Geotechnical Study in Support of West Branch Expansion, Kinross Tasiast, Report 12514150422.502/A.0. Unpublished Technical Report, June 2014.

Page 227
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Guibal, D., Uttley, P., de Visser, J., and Warren, M., 2003. Independent Technical Assessment Report on the Tasiast Project, Mauritania; Report Prepared for Midas Gold plc. and Geomaque Explorations Ltd: unpublished technical report prepared by SRK Consulting for Midas Gold plc. and Geomaque Explorations Ltd, effective date March 4, 2003.

Heberlein, D., 2011. QAQC update – laboratory duplicate results (Oct-Dec 2011). Internal unpublished report (October 2011).

Heberlein, D., 2013. QAQC Update (August 2012). Internal report prepared for Tasiast Mauritanie Ltd S. A.; a division of Kinross Gold Corp, September 4, 2013.

Heron, K., Jessell, M., Benn, K., Harris, E., and Crowley, Q.G., 2016. The Tasiast deposit, Mauritania. Ore Geology Reviews 78: 564–572.

Hyde, R., 2003. Tasiast Gold Project, Review of Sampling Procedures and QAQC Analysis for Midas Gold plc.: RSG Global Report No. TAS003, 42 pages (unpublished).

JKTech, undated. JK Drop Weight Test, “In Detail” white paper by JKTech Laboratory Services. Leitch, C., 2010. Petrographic report on 18 samples from Archean greenstone au deposit. Internal unpublished report, October 2010.

Lahondere, D., Thieblemont, D., Goujou, J.C., Roger, J., Moussine-Pouchkine, A., Le Metour, J., Cocherie, A., and Guerrot, C., 2003. Notice explicative des cartes géologiques à 1/200,000 et 1/500,000 de l’extrême sud de la Mauritanie: DMG, Ministère des Mines et de l’Industrie, Nouakchott, Rapport BRGM/RC-54273-FR, p. 610.

Larson, T., 2011. Petrography: Tasiast Project (WestBranch_Petrography). Unpublished report.

Leroux, D.C. and Puritch, E., 2003. Technical Report and Resource Estimation on the Tasiast Gold Project Islamic Republic of Mauritania for Defiance Mining Corporation: unpublished technical report prepared by ACA Howe for Defiance Mining Corporation, effective date October 10, 2003.

Leroux, D.C., Roy, W.D., and Orava D., 2007. Technical Report on the Tasiast Gold Project Islamic Republic of Mauritania for Red Back Mining Inc.: unpublished technical report prepared by ACA Howe for Red Back Mining Inc., effective date July 20, 2007.

Page 228
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Panterra, 2012. Petrographic Study of the Tasiast Deposit, Mauritania, West Africa, November 7, 2012.

Panterra, 2017. Petrographic Report on the Tasiast West Branch Pit, Mauritania, West Africa, Feb 18, 2017.

Pitfield, P.E.J., Key, R.M., Waters, C.N., Hawkins, M.P.H., Schofield, D.I., Loughlini, S., and Barnes, R P., 2004. Notice explicative des cartes géologiques et gîtologiques à 1/200 000 et 1/500 000 du Sud de la Mauritanie, Volume 1 Géologie: DMG Ministère des Mines et de l’Industrie, Nouakchott, p. 314.

Pollard, P., 2011. Hydrothermal Alteration and Mineralization in the Lower West Branch Zone, Tasiast Gold Mine, Mauritania: unpublished technical report prepared for Kinross Gold.

Schlumberger, 2014. Hydrogeological Characterisation of the West Branch Pit, Tasiast, Mauritania. Technical Report Ref 52116/R1, January 2014.

Schofield, D., Horstwood. M.S.A., Pitfield, P.E.J., Crowley, Q.G., Wilkinson, A.F. & Sidaty, H.C.O., 2006. Timing and kinematics of Eburnean tectonics in the central Reguibat Shield, Mauritania. Journal Geological Society London, 163, 549-560.

Scott Wilson, 2008a. Tasiast Gold Project, Environmental Impact Study, Addendum II of IV, Environmental Impact Review of Tailings Storage Facility: Report prepared by Scott Wilson Limited for Tasiast Mauritania Limited S.A. for submission to Mauritanian Government, February 2008.

Scott Wilson, 2008b. Tasiast Gold Project, Environmental Impact Study, Addendum III of IV, Environmental Management Plan: Report prepared by Scott Wilson Limited for Tasiast Mauritania Limited S.A. for submission to Mauritanian Government, February 2008.

Scott Wilson, 2008c. Tasiast Gold Project, Environmental Impact Study, Addendum IV of IV Preliminary Rehabilitation and Closure Plan: Report prepared by Scott Wilson Limited for Tasiast Mauritania Limited S.A. for submission to Mauritanian Government, February 2008.

Scott Wilson, 2009. Tasiast Gold Project, Environmental Impact Study for New Developments. Scott Wilson, 2010. Tasiast Gold Mine West Branch Development: Environmental Impact Assessment.

Scott Wilson, 2011. Tasiast West Branch Slope Stability Analysis.

Page 229
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Sims, J., 2019. Tasiast Project, National Instrument 43-101 Technical Report: prepared for Kinross Gold Corporation, effective date October 31, 2019.

SLR, 2024. Tasiast Mine. Audit Review of YE 2023 MRMR.

Strashimirov, S., 2010. Petrological and mineralogical studies of 10 samples from Mauritania. Internal unpublished report, August 2010.

Stuart, H., 2008. Technical Report on the Tasiast Gold Mine Islamic Republic of Mauritania for Red Back Mining Inc.: unpublished technical report prepared for Red Back Mining Inc., effective date May 24, 2008.

Stuart, H., 2009. Technical Report on the Tasiast Gold Mine Islamic Republic of Mauritania for Red Back Mining Inc.: unpublished technical report prepared for Red Back Mining Inc., effective date May 8, 2009.

Stuart, H., 2010. Technical Report on the Tasiast Gold Mine Islamic Republic of Mauritania for Red Back Mining Inc.: unpublished technical report prepared for Red Back Mining Inc., effective date September 6, 2010.

Page 230
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
28. Date and Signature Page
--- ---

This Technical Report entitled “Tasiast Mine, Mauritania - National Instrument 43-101 Technical Report” with an effective date of December 31, 2024 was prepared by the following authors:

(Signed and Sealed) Nicos Pfeiffer

Nicos Pfeiffer, P.Geo.

Vice President, Geology & Technical Evaluations

March 27, 2025

(Signed and Sealed) Agung Prawasono

Agung Prawasono , P.Eng.

Sr. Director, Mine Planning

March 27, 2025

(Signed and Sealed) Yves Breau

Yves Breau, P.Eng.

Vice President, Metallurgy & Engineering

March 27, 2025

(Signed and Sealed) Graham Long

Graham Long, P.Geo.

Vice President, Exploration

March 27, 2025

(Signed and Sealed) Jacob Brown

Jacob Brown, SME (RM)

Director, Resource & Mine Geology

March 27, 2025

Page 231
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

(Signed and Sealed) Kevin vanWarmerdam

Kevin van Warmerdam, P. Eng.

Sr. Director, Engineering & Energy

March 27, 2025

Page 232
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
29. Certificate of Qualified Person
--- ---
29.1 Nicos Pfeiffer
--- ---

I, Nicos Pfeiffer, P.Geo., as an author of this report entitled “Tasiast Mine, Mauritania - National Instrument 43-101 Technical Report” with an effective date of December 31, 2024, prepared for Kinross Gold Corporation, do hereby certify that:

1) I am Vice President, Geology &<br> Technical Evaluations and Company QP with Kinross Gold Corp. of 25 York Street, 17^th^floor, Toronto, Ontario.
2) I am a graduate of Carleton University,<br> Ottawa, Ontario in 2009 with an Honours B.Sc. Earth Science.
--- ---
3) I am registered as a Professional Geologist<br> in the Province of Ontario (Reg# 2354). I have over 15 years of mining industry experience.<br> My relevant experience for the purpose of the Technical Report is:
--- ---
o Domestic and international experience<br> in both underground and open pit operational geology roles as well as exploration and resource<br> estimation.
--- ---
o Experience leading multi-disciplinary<br> technical teams in both a corporate and operational capacity.
--- ---
4) I have read the definition of "qualified<br> person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason<br> of my education, affiliation with a professional association (as defined in NI 43-101) and<br> past relevant work experience, I fulfill the requirements to be a "qualified person"<br> for the purposes of NI 43-101.
--- ---
5) I last visited the Tasiast Mine on 25<br> – 28 November, 2024.
--- ---
6) I am responsible for Sections 3-6, 20,<br> 23, 24, and relevant portions of 1, 2, 25, 26, 27 of the Technical Report.
--- ---
7) I am not independent of the Issuer applying<br> the test set out in Section 1.5 of NI 43-101.
--- ---
8) I have had prior involvement with the<br> property that is the subject of the Technical Report.
--- ---
9) I have read NI 43-101, and the Technical<br> Report has been prepared in compliance with NI 43-101 and Form 43-101F1.
--- ---
10) At the effective date of the Technical<br> Report, to the best of my knowledge, information, and belief, the sections of the Technical<br> Report for which I am responsible contain all scientific and technical information that is<br> required to be disclosed to make the Technical Report not misleading.
--- ---
Page 233
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Dated 27^th^ day of March, 2025

(Signed and Sealed) Nicos Pfeiffer

Nicos Pfeiffer, P.Geo.

Page 234
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
29.2 Agung Prawasono
--- ---

I, Agung Prawasono, P.Eng., as an author of this report entitled “Tasiast Mine, Mauritania - National Instrument 43-101 Technical Report” with an effective date of December 31, 2024, prepared for Kinross Gold Corporation, do hereby certify that:

1) I am Senior Director, Mine Planning with<br> Kinross Gold Corp. of 25 York Street, 17^th^ floor, Toronto, Ontario.
2) I am a graduate of UPN “Veteran”<br> Yogyakarta, Indonesia in 1999 with a Mining Engineer Degree.
--- ---
3) I am a Professional Engineer in Professional<br> Engineers Ontario (No. 1005533117). I have worked as a mining engineer for a total of<br> 25 years since my graduation. My relevant experience for the purpose of the Technical Report<br> is:
--- ---
o A total of 25 years experience in resource<br> optimization related works that includes mine designs and mine planning for precious and<br> base metal operations and projects in Indonesia, India, Africa, North America, and South<br> America.
--- ---
4) I have read the definition of "qualified<br> person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason<br> of my education, affiliation with a professional association (as defined in NI 43-101) and<br> past relevant work experience, I fulfill the requirements to be a "qualified person"<br> for the purposes of NI 43-101.
--- ---
5) I last visited the Tasiast Mine on 23<br> February – 2 March, 2025.
--- ---
6) I am responsible for Sections 15 and 16<br> and relevant portions of 1, 2, 25, 26, 27 of the Technical Report.
--- ---
7) I am not independent of the Issuer applying<br> the test set out in Section 1.5 of NI 43-101.
--- ---
8) I have had prior involvement with the<br> property that is the subject of the Technical Report.
--- ---
9) I have read NI 43-101, and the Technical<br> Report has been prepared in compliance with NI 43-101 and Form 43-101F1.
--- ---
10) At the effective date of the Technical<br> Report, to the best of my knowledge, information, and belief, the sections of the Technical<br> Report for which I am responsible contain all scientific and technical information that is<br> required to be disclosed to make the Technical Report not misleading.
--- ---
Page 235
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Dated 27^th^ day of March, 2025

(Signed and Sealed) Agung Prawasono

Agung Prawasono, P.Eng.

Page 236
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
29.3 Yves Breau
--- ---

I, Yves Breau, P.Eng., as an author of this report entitled “Tasiast Mine, Mauritania - National Instrument 43-101 Technical Report” with an effective date of December 31^^2024, prepared for Kinross Gold Corporation, do hereby certify that:

1) I am Vice President, Metallurgy &<br> Engineering with Kinross Gold Corporation, of 25 York Street, 17^th^ Floor,<br> Toronto, Ontario, M5J 2V5.
2) I am a graduate of University of Laval,<br> Québec City in 1997 with a B.Sc. in Materials and Metallurgy Engineering.
--- ---
3) I am registered as a Professional Engineer<br> in the Province of Ontario (Reg.# 100194755). I have worked as an engineer for a total<br> of 26 years since my graduation. My relevant experience for the purpose of the Technical<br> Report is:
--- ---
o My work experience has included multiple<br> operations roles from metallurgist to process manager and multiple mining company corporate<br> roles from manager to Vice-President.
--- ---
o In my roles in operations and corporate, I<br> have completed many studies related to gold mineral processing.
--- ---
4) I have read the definition of “qualified<br> person” set out in National Instrument 43-101 (NI 43-101) and certify that by reason<br> of my education, affiliation with a professional association (as defined in NI 43-101) and<br> past relevant work experience, I fulfill the requirements to be a “qualified person”<br> for the purposes of NI 43-101.
--- ---
5) I last visited the Tasiast Mine on 4 –<br> 10 August, 2024.
--- ---
6) I am responsible for Sections 13, 17,<br> 18, 19, and relevant portions of 1, 2, 25, 26, 27 of the Technical Report.
--- ---
7) I am not independent of the Issuer applying<br> the test set out in Section 1.5 of NI 43-101.
--- ---
8) I have had prior involvement with the<br> property that is the subject of the Technical Report.
--- ---
9) I have read NI 43-101, and the Technical<br> Report has been prepared in compliance with NI 43-101 and Form 43-101F1.
--- ---
10) At the effective date of the Technical<br> Report, to the best of my knowledge, information, and belief, the sections of the Technical<br> Report for which I am responsible contain all scientific and technical information that is<br> required to be disclosed to make the Technical Report not misleading.
--- ---
Page 237
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Dated 27^th^ day of March, 2025

(Signed and Sealed) Yves Breau

Yves Breau, P.Eng.

Page 238
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
29.4 Graham Long
--- ---

I, Graham Long, P.Geo., as an author of this report entitled “Tasiast Mine, Mauritania - National Instrument 43-101 Technical Report” with an effective date of December 31,^,^2024, prepared for Kinross Gold Corporation, do hereby certify that:

1) I am Vice President, Exploration with<br> Kinross Gold Corp. of 25 York Street, 17^th^ floor, Toronto, Ontario.
2) I am a graduate of Concordia University,<br> Montreal in 1988 with a B.Sc. Specialization in Geology.
--- ---
3) I am a Professional Geologist registered<br> with the Ordre des Géologues du Québec (OGQ, [No. 01030]) and the Northwest<br> Territories and Nunavut Association of Professional Engineers and Geoscientists (NAPEG, [No. L2076]).<br> I have worked as a geologist for a total of 36 years since my graduation. My relevant experience<br> for the purpose of the Technical Report is:
--- ---
o Experience in domestic and international<br> work in exploring orebodies from surface and underground. I have experience in both open<br> pit and underground mining.
--- ---
4) I have read the definition of "qualified<br> person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason<br> of my education, affiliation with a professional association (as defined in NI 43-101) and<br> past relevant work experience, I fulfill the requirements to be a "qualified person"<br> for the purposes of NI 43-101.
--- ---
5) I last visited the Tasiast Mine on 17<br> – 26 November 2024.
--- ---
6) I am responsible for Sections 7, 8, 9<br> ,10, and relevant portions of 1, 2, 25, 26, 27 of the Technical Report.
--- ---
7) I am not independent of the Issuer applying<br> the test set out in Section 1.5 of NI 43-101.
--- ---
8) I have had prior involvement with the<br> property that is the subject of the Technical Report.
--- ---
9) I have read NI 43-101, and the Technical<br> Report has been prepared in compliance with NI 43-101 and Form 43-101F1.
--- ---
10) At the effective date of the Technical<br> Report, to the best of my knowledge, information, and belief, the sections of the Technical<br> Report for which I am responsible contain all scientific and technical information that is<br> required to be disclosed to make the Technical Report not misleading.
--- ---
Page 239
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Dated 27^th^ day of March, 2025

(Signed and Sealed) Graham Long

Graham Long, P.Geo.

Page 240
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
29.5 Jacob Brown
--- ---

I, Jacob Brown, SME (RM), as an author of this report entitled “Tasiast Mine, Mauritania - National Instrument 43-101 Technical Report” with an effective date of December 31, 2024, prepared for Kinross Gold Corporation, do hereby certify that:

1) I am Director, Resource and Mine Geology<br> with Kinross Gold Corp. of 25 York Street, 17^th^ floor, Toronto, Ontario.
2) I am a graduate of University of Northern<br> Colorado, Colorado in 2012 with a Geology Degree, and an MBA in 2024 from the same university.
--- ---
3) I am a Registered Member of the Society<br> for Mining, Metallurgy & Exploration (No. 04293143). I have worked as a geologist<br> for a total of 13 years since my graduation. My relevant experience for the purpose of the<br> Technical Report is:
--- ---
o Domestic and international experience<br> across North America, South America and Africa. Experienced in performing and being directly<br> responsible for multidisciplinary teams including open pit mine geology, underground mine<br> geology, resource estimation, exploration, short- and long-range mine planning.
--- ---
4) I have read the definition of "qualified<br> person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason<br> of my education, affiliation with a professional association (as defined in NI 43-101) and<br> past relevant work experience, I fulfill the requirements to be a "qualified person"<br> for the purposes of NI 43-101.
--- ---
5) I have not visited the Tasiast Mine.
--- ---
6) I am responsible for Sections 11, 12,<br> 14, and relevant portions of 1, 2, 25, 26, 27 of the Technical Report.
--- ---
7) I am not independent of the Issuer applying<br> the test set out in Section 1.5 of NI 43-101.
--- ---
8) I have had prior involvement with the<br> property that is the subject of the Technical Report.
--- ---
9) I have read NI 43-101, and the Technical<br> Report has been prepared in compliance with NI 43-101 and Form 43-101F1.
--- ---
10) At the effective date of the Technical<br> Report, to the best of my knowledge, information, and belief, the sections of the Technical<br> Report for which I am responsible contain all scientific and technical information that is<br> required to be disclosed to make the Technical Report not misleading.
--- ---
Page 241
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Dated 27^th^ day of March, 2025

(Signed and Sealed) Jacob Brown

Jacob Brown, SME (RM)

Page 242
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report
29.6 Kevin van Warmerdam
--- ---

I, Kevin van Warmerdam, P.Eng, as an author of this report entitled “Tasiast Mine, Mauritania - National Instrument 43-101 Technical Report” with an effective date of December 31, 2024, prepared for Kinross Gold Corporation, do hereby certify that:

1) I am Senior Director, Engineering and<br> Energy with Kinross Gold Corp. of 25 York Street, 17^th^ floor, Toronto,<br> Ontario.
2) I am a graduate of Queen’s, Ontario<br> in 2008 with a Degree of Mechanical Engineering. I am a graduate of the Schulich School of<br> Business, Toronto, Ontario in 2016 with an MBA.
--- ---
3) I am a Professional Engineer in Professional<br> Engineer in the Province of Ontario (No. 100133956). I have worked as an engineer for<br> a total of 16 years since my graduation. My relevant experience for the purpose of the Technical<br> Report is:
--- ---
o My work experience has included involvement<br> in and leadership of many gold projects ranging from early-stage studies to detailed execution<br> including detailed design, construction, commissioning, and ramp-up.
--- ---
o I have developed and owned detailed financial<br> models for gold project valuations as well as led or peer reviewed project economic analysis<br> work by others.
--- ---
4) I have read the definition of "qualified<br> person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason<br> of my education, affiliation with a professional association (as defined in NI 43-101) and<br> past relevant work experience, I fulfill the requirements to be a "qualified person"<br> for the purposes of NI 43-101.
--- ---
5) I last visited the Tasiast Mine on 17<br> – 21 October, 2024.
--- ---
6) I am responsible for Sections 21, 22,<br> and relevant portions of 1, 2, 25, 26, 27 of the Technical Report.
--- ---
7) I am not independent of the Issuer applying<br> the test set out in Section 1.5 of NI 43-101.
--- ---
8) I have had prior involvement with the<br> property that is the subject of the Technical Report.
--- ---
9) I have read NI 43-101, and the Technical<br> Report has been prepared in compliance with NI 43-101 and Form 43-101F1.
--- ---
10) At the effective date of the Technical<br> Report, to the best of my knowledge, information, and belief, the sections of the Technical<br> Report for which I am responsible contain all scientific and technical information that is<br> required to be disclosed to make the Technical Report not misleading.
--- ---
Page 243
Kinross Gold Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical Report

Dated 27^th^ day of March, 2025

(Signed and Sealed) Kevin vanWarmerdam

Kevin van Warmerdam, P.Eng.

Page 244

Exhibit 99.2

Kinross Gold<br> Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

NicosPfeiffer

I, Nicos Pfeiffer, P.Geo., as an author of this report entitled “Tasiast Mine, Mauritania - National Instrument 43-101 Technical Report” with an effective date of December 31, 2024, prepared for Kinross Gold Corporation, do hereby certify that:

1) I am Vice<br> President, Geology & Technical Evaluations and Company QP with Kinross Gold Corp.<br> of 25 York Street, 17^th^ floor, Toronto, Ontario.
2) I am a graduate<br> of Carleton University, Ottawa, Ontario in 2009 with an Honours B.Sc. Earth Science.
--- ---
3) I am registered<br> as a Professional Geologist in the Province of Ontario (Reg# 2354). I have over 15 years<br> of mining industry experience. My relevant experience for the purpose of the Technical Report<br> is:
--- ---
o Domestic and<br> international experience in both underground and open pit operational geology roles as well<br> as exploration and resource estimation.
--- ---
o Experience<br> leading multi-disciplinary technical teams in both a corporate and operational capacity.
--- ---
4) I have read<br> the definition of "qualified person" set out in National Instrument 43-101 (NI<br> 43-101) and certify that by reason of my education, affiliation with a professional association<br> (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements<br> to be a "qualified person" for the purposes of NI 43-101.
--- ---
5) I last visited<br> the Tasiast Mine on 25 – 28 November, 2024.
--- ---
6) I am responsible<br> for Sections 3-6, 20, 23, 24, and relevant portions of 1, 2, 25, 26, 27 of the Technical<br> Report.
--- ---
7) I am not<br> independent of the Issuer applying the test set out in Section 1.5 of NI 43-101.
--- ---
8) I have had<br> prior involvement with the property that is the subject of the Technical Report.
--- ---
9) I have read<br> NI 43-101, and the Technical Report has been prepared in compliance with NI 43-101 and Form 43-101F1.
--- ---
Page 1
Kinross Gold<br> Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report
10) At the<br> effective date of the Technical Report, to the best of my knowledge, information, and belief,<br> the sections of the Technical Report for which I am responsible contain all scientific and<br> technical information that is required to be disclosed to make the Technical Report not misleading.
--- ---

Dated 27^th^ day of March, 2025

(Signedand Sealed) Nicos Pfeiffer

Nicos Pfeiffer, P.Geo.

Page 2

Exhibit 99.3

March 27, 2025

Consent of Qualified Person

TO: Ontario Securities Commission
AND TO: British Columbia Securities Commission
Alberta Securities Commission
Financial and Consumer Affairs Authority of Saskatchewan
Manitoba Securities Commission
Autorité des marchés financiers
New Brunswick Financial and Consumer Services Commission
Nova Scotia Securities Commission
Office of the Superintendent of Securities, Prince Edward Island
Office of the Superintendent of Securities, Service Newfoundland and Labrador
(collectively, the “Canadian Securities Commissions”)

Re: Technical Report by Kinross GoldCorporation

Reference is made to the technical report titled “Tasiast Mine - Mauritania – National Instrument 43-101 Technical Report”, with an effective date of December 31, 2024, prepared for Kinross Gold Corporation and dated March 27, 2025 (the Technical Report).

Pursuant to Section 8.3 of National Instrument 43-101 – Standards of Disclosure for Mineral Projects, I, Nicos Pfeiffer, P.Geo., do hereby consent to the public filing of the Technical Report by Kinross Gold Corporation with the Canadian Securities Commissions.

(Signed and Sealed) Nicos Pfeiffer

Nicos Pfeiffer, P.Geo.

Vice President, Geology & Technical Evaluations

Kinross Gold Corporation

Exhibit 99.4

CONSENT OF NICOS PFEIFFER

TO BEING NAMED AS A QUALIFIED PERSON

March 27, 2025

I hereby consent to the inclusions of the “Tasiast Mine - Mauritania – National Instrument 43-101 Technical Report” (“Technical Report”), effective date December 31, 2024 in the report on Form 6-K dated March 27, 2025 to be filed by Kinross Gold Corporation.

I also hereby consent to the incorporation by reference of the Technical Report into the Registration Statements on Form S-8 (Registration No. 333-262966 filed on February 24, 2022, Registration No. 333-217099 filed on April 3, 2017 and Registration Nos. 333-180824, 333-180823 and 333-180822 filed on April 19, 2012).

Sincerely,

/s/ Nicos Pfeiffer

Nicos Pfeiffer, P.Geo.

Exhibit 99.5

Kinross Gold<br> Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

GrahamLong

I, Graham Long, P.Geo., as an author of this report entitled “Tasiast Mine, Mauritania - National Instrument 43-101 Technical Report” with an effective date of December 31,^,^2024, prepared for Kinross Gold Corporation, do hereby certify that:

1) I am Vice<br> President, Exploration with Kinross Gold Corp. of 25 York Street, 17^th^ floor,<br> Toronto, Ontario.
2) I am a graduate<br> of Concordia University, Montreal in 1988 with a B.Sc. Specialization in Geology.
--- ---
3) I am a Professional<br> Geologist registered with the Ordre des Géologues du Québec (OGQ, [No. 01030])<br> and the Northwest Territories and Nunavut Association of Professional Engineers and Geoscientists<br> (NAPEG, [No. 2076]). I have worked as a geologist for a total of 36 years since my graduation.<br> My relevant experience for the purpose of the Technical Report is:
--- ---
o Experience<br> in domestic and international work in exploring orebodies from surface and underground. I<br> have experience in both open pit and underground mining.
--- ---
4) I have read<br> the definition of "qualified person" set out in National Instrument 43-101 (NI<br> 43-101) and certify that by reason of my education, affiliation with a professional association<br> (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements<br> to be a "qualified person" for the purposes of NI 43-101.
--- ---
5) I last visited<br> the Tasiast Mine on 17 – 26 November 2024.
--- ---
6) I am responsible<br> for Sections 7, 8, 9 ,10, and relevant portions of 1, 2, 25, 26, 27 of the Technical Report.
--- ---
7) I am not<br> independent of the Issuer applying the test set out in Section 1.5 of NI 43-101.
--- ---
8) I have had<br> prior involvement with the property that is the subject of the Technical Report.
--- ---
9) I have read<br> NI 43-101, and the Technical Report has been prepared in compliance with NI 43-101 and Form 43-101F1.
--- ---
Page 1
Kinross Gold<br> Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report
10) At the<br> effective date of the Technical Report, to the best of my knowledge, information, and belief,<br> the sections of the Technical Report for which I am responsible contain all scientific and<br> technical information that is required to be disclosed to make the Technical Report not misleading.
--- ---

Dated 27^th^ day of March, 2025

(Signedand Sealed) Graham Long

Graham Long, P.Geo.

Page 2

Exhibit 99.6

March 27, 2025

Consent of Qualified Person

TO: Ontario Securities Commission
AND TO: British Columbia Securities Commission
Alberta Securities Commission
Financial and Consumer Affairs Authority of Saskatchewan
Manitoba Securities Commission
Autorité des marchés financiers
New Brunswick Financial and Consumer Services Commission
Nova Scotia Securities Commission
Office of the Superintendent of Securities, Prince Edward Island
Office of the Superintendent of Securities, Service Newfoundland and
Labrador
(collectively, the “Canadian Securities Commissions”)

Re: Technical Report by KinrossGold Corporation

Reference is made to the technical report titled “Tasiast Mine - Mauritania – National Instrument 43-101 Technical Report”, with an effective date of December 31, 2024, prepared for Kinross Gold Corporation and dated March 27, 2025 (the Technical Report).

Pursuant to Section 8.3 of National Instrument 43-101 – Standards of Disclosure for Mineral Projects, I, Graham Long, P.Geo., do hereby consent to the public filing of the Technical Report by Kinross Gold Corporation with the Canadian Securities Commissions.

(Signed and Sealed) Graham Long

Graham Long, P.Geo.

Vice President, Exploration

Kinross Gold Corporation

Exhibit 99.7

CONSENT OF GRAHAM LONG

TO BEING NAMED AS A QUALIFIED PERSON

March 27, 2025

I hereby consent to the inclusions of the “Tasiast Mine - Mauritania – National Instrument 43-101 Technical Report” (“Technical Report”), effective date December 31, 2024 in the report on Form 6-K dated March 27, 2025 to be filed by Kinross Gold Corporation.

I also hereby consent to the incorporation by reference of the Technical Report into the Registration Statements on Form S-8 (Registration No. 333-262966 filed on February 24, 2022, Registration No. 333-217099 filed on April 3, 2017 and Registration Nos. 333-180824, 333-180823 and 333-180822 filed on April 19, 2012).

Sincerely,

/s/ Graham Long
Graham Long, P.Geo.

Exhibit 99.8

Kinross Gold<br> Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

YvesBreau

I, Yves Breau, P.Eng., as an author of this report entitled “Tasiast Mine, Mauritania - National Instrument 43-101 Technical Report” with an effective date of December 31^^2024, prepared for Kinross Gold Corporation, do hereby certify that:

1) I<br> am Vice President, Metallurgy & Engineering with Kinross Gold Corporation, of 25 York<br> Street, 17^th^ Floor, Toronto, Ontario, M5J 2V5.
2) I<br> am a graduate of University of Laval, Québec City in 1997 with a B.Sc. in Materials<br> and Metallurgy Engineering.
--- ---
3) I<br> am registered as a Professional Engineer in the Province of Ontario (Reg.# 100194755).<br> I have worked as an engineer for a total of 26 years since my graduation. My relevant experience<br> for the purpose of the Technical Report is:
--- ---
o My<br> work experience has included multiple operations roles from metallurgist to process manager<br> and multiple mining company corporate roles from manager to Vice-President.
--- ---
o In<br> my roles in operations and corporate, I have completed many studies related to gold<br> mineral processing.
--- ---
4) I<br> have read the definition of “qualified person” set out in National Instrument<br> 43-101 (NI 43-101) and certify that by reason of my education, affiliation with a professional<br> association (as defined in NI 43-101) and past relevant work experience, I fulfill the<br> requirements to be a “qualified person” for the purposes of NI 43-101.
--- ---
5) I<br> last visited the Tasiast Mine on 4 – 10 August, 2024.
--- ---
6) I<br> am responsible for Sections 13, 17, 18, 19, and relevant portions of 1, 2, 25, 26, 27 of<br> the Technical Report.
--- ---
7) I<br> am not independent of the Issuer applying the test set out in Section 1.5 of NI 43-101.
--- ---
8) I<br> have had prior involvement with the property that is the subject of the Technical Report.
--- ---
9) I<br> have read NI 43-101, and the Technical Report has been prepared in compliance with NI 43-101<br> and Form 43-101F1.
--- ---
Page 1
Kinross Gold<br> Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report
10) At<br> the effective date of the Technical Report, to the best of my knowledge, information, and<br> belief, the sections of the Technical Report for which I am responsible contain all scientific<br> and technical information that is required to be disclosed to make the Technical Report not<br> misleading.
--- ---

Dated 27^th^ day of March, 2025

(Signedand Sealed) Yves Breau

Yves Breau, P.Eng.

Page 2

Exhibit 99.9

March 27, 2025

Consent of Qualified Person

TO: Ontario Securities Commission
AND TO: British Columbia Securities Commission
Alberta Securities Commission
Financial and Consumer Affairs Authority of Saskatchewan
Manitoba Securities Commission
Autorité des marchés financiers
New Brunswick Financial and Consumer Services Commission
Nova Scotia Securities Commission
Office of the Superintendent of Securities, Prince Edward Island
Office of the Superintendent of Securities, Service Newfoundland and
Labrador
(collectively, the “Canadian Securities Commissions”)

Re: Technical Report by Kinross GoldCorporation

Reference is made to the technical report titled “Tasiast Mine - Mauritania – National Instrument 43-101 Technical Report”, with an effective date of December 31, 2024, prepared for Kinross Gold Corporation and dated March 27, 2025 (the Technical Report).

Pursuant to Section 8.3 of National Instrument 43-101 – Standards of Disclosure for Mineral Projects, I, Yves Breau, P.Eng., do hereby consent to the public filing of the Technical Report by Kinross Gold Corporation with the Canadian Securities Commissions.

(Signed and Sealed) Yves Breau

Yves Breau, P.Eng.

Vice President, Metallurgy & Engineering

Kinross Gold Corporation

Exhibit 99.10

CONSENT OF YVES BREAU

TO BEING NAMED AS A QUALIFIED PERSON

March 27, 2025

I hereby consent to the inclusions of the “Tasiast Mine - Mauritania – National Instrument 43-101 Technical Report” (“Technical Report”), effective date December 31, 2024 in the report on Form 6-K dated March 27, 2025 to be filed by Kinross Gold Corporation.

I also hereby consent to the incorporation by reference of the Technical Report into the Registration Statements on Form S-8 (Registration No. 333-262966 filed on February 24, 2022, Registration No. 333-217099 filed on April 3, 2017 and Registration Nos. 333-180824, 333-180823 and 333-180822 filed on April 19, 2012).

Sincerely,

/s/ Yves Breau
Yves Breau, P.Eng.

Exhibit 99.11

Kinross Gold<br> Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

AgungPrawasono

I, Agung Prawasono, P.Eng., as an author of this report entitled “Tasiast Mine, Mauritania - National Instrument 43-101 Technical Report” with an effective date of December 31, 2024, prepared for Kinross Gold Corporation, do hereby certify that:

1) I am Senior<br> Director, Mine Planning with Kinross Gold Corp. of 25 York Street, 17^th^ floor,<br> Toronto, Ontario.
2) I am a graduate<br> of UPN “Veteran” Yogyakarta, Indonesia in 1999 with a Mining Engineer Degree.
--- ---
3) I am a Professional<br> Engineer in Professional Engineers Ontario (No. 1005533117). I have worked as a mining<br> engineer for a total of 25 years since my graduation. My relevant experience for the purpose<br> of the Technical Report is:
--- ---
o A total of<br> 25 years experience in resource optimization related works that includes mine designs and<br> mine planning for precious and base metal operations and projects in Indonesia, India,<br> Africa, North America, and South America.
--- ---
4) I have read<br> the definition of "qualified person" set out in National Instrument 43-101 (NI<br> 43-101) and certify that by reason of my education, affiliation with a professional association<br> (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements<br> to be a "qualified person" for the purposes of NI 43-101.
--- ---
5) I last visited<br> the Tasiast Mine on 23 February – 2 March, 2025.
--- ---
6) I am responsible<br> for Sections 15 and 16 and relevant portions of 1, 2, 25, 26, 27 of the Technical Report.
--- ---
7) I am not<br> independent of the Issuer applying the test set out in Section 1.5 of NI 43-101.
--- ---
8) I have had<br> prior involvement with the property that is the subject of the Technical Report.
--- ---
9) I have read<br> NI 43-101, and the Technical Report has been prepared in compliance with NI 43-101 and Form 43-101F1.
--- ---
Page 1
Kinross Gold<br> Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report
10) At the<br> effective date of the Technical Report, to the best of my knowledge, information, and belief,<br> the sections of the Technical Report for which I am responsible contain all scientific and<br> technical information that is required to be disclosed to make the Technical Report not misleading.
--- ---

Dated 27^th^day of March, 2025

(Signed andSealed) Agung Prawasono

Agung Prawasono, P.Eng

Page 2

Exhibit 99.12

March 27, 2025

Consent of Qualified Person

TO: Ontario Securities Commission
AND TO: British Columbia Securities Commission
Alberta Securities Commission
Financial and Consumer Affairs Authority of Saskatchewan
Manitoba Securities Commission
Autorité des marchés financiers
New Brunswick Financial and Consumer Services Commission
Nova Scotia Securities Commission
Office of the Superintendent of Securities, Prince Edward Island
Office of the Superintendent of Securities, Service Newfoundland and
Labrador
(collectively, the “Canadian Securities Commissions”)

Re: Technical Report by KinrossGold Corporation

Reference is made to the technical report titled “Tasiast Mine - Mauritania – National Instrument 43-101 Technical Report”, with an effective date of December 31, 2024, prepared for Kinross Gold Corporation and dated March 27, 2025 (the Technical Report).

Pursuant to Section 8.3 of National Instrument 43-101 – Standards of Disclosure for Mineral Projects, I, Agung Prawasono , P.Eng., do hereby consent to the public filing of the Technical Report by Kinross Gold Corporation with the Canadian Securities Commissions.

(Signed and Sealed) Agung Prawasono

Agung Prawasono , P.Eng.

Sr. Director, Mine Planning

Kinross Gold Corporation

Exhibit 99.13

CONSENT OF AGUNG PRAWASONO

TO BEING NAMED AS A QUALIFIED PERSON

March 27, 2025

I hereby consent to the inclusions of the “Tasiast Mine - Mauritania – National Instrument 43-101 Technical Report” (“Technical Report”), effective date December 31, 2024 in the report on Form 6-K dated March 27, 2025 to be filed by Kinross Gold Corporation.

I also hereby consent to the incorporation by reference of the Technical Report into the Registration Statements on Form S-8 (Registration No. 333-262966 filed on February 24, 2022, Registration No. 333-217099 filed on April 3, 2017 and Registration Nos. 333-180824, 333-180823 and 333-180822 filed on April 19, 2012).

Sincerely,

/s/ Agung Prawasono
Agung Prawasono, P.Eng., PMP

Exhibit 99.14

Kinross Gold<br> Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

Kevinvan Warmerdam

I, Kevin van Warmerdam, P.Eng, as an author of this report entitled “Tasiast Mine, Mauritania - National Instrument 43-101 Technical Report” with an effective date of December 31, 2024, prepared for Kinross Gold Corporation, do hereby certify that:

1) I am Senior<br> Director, Engineering and Energy with Kinross Gold Corp. of 25 York Street, 17^th^floor, Toronto, Ontario.
1) I am a graduate<br> of Queen’s, Ontario in 2008 with a Degree of Mechanical Engineering. I am a graduate<br> of the Schulich School of Business, Toronto, Ontario in 2016 with an MBA.
--- ---
2) I am a Professional<br> Engineer in Professional Engineer in the Province of Ontario (No. 100133956). I have<br> worked as an engineer for a total of 16 years since my graduation. My relevant experience<br> for the purpose of the Technical Report is:
--- ---
o My work experience<br> has included involvement in and leadership of many gold projects ranging from early-stage<br> studies to detailed execution including detailed design, construction, commissioning, and<br> ramp-up.
--- ---
o I have developed<br> and owned detailed financial models for gold project valuations as well as led or peer reviewed<br> project economic analysis work by others.
--- ---
3) I have read<br> the definition of "qualified person" set out in National Instrument 43-101 (NI<br> 43-101) and certify that by reason of my education, affiliation with a professional association<br> (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements<br> to be a "qualified person" for the purposes of NI 43-101.
--- ---
4) I last visited<br> the Tasiast Mine on 17 – 21 October, 2024.
--- ---
5) I am responsible<br> for Sections 21, 22, and relevant portions of 1, 2, 25, 26, 27 of the Technical Report.
--- ---
6) I am not<br> independent of the Issuer applying the test set out in Section 1.5 of NI 43-101.
--- ---
7) I have had<br> prior involvement with the property that is the subject of the Technical Report.
--- ---
8) I have read<br> NI 43-101, and the Technical Report has been prepared in compliance with NI 43-101 and Form 43-101F1.
--- ---
Page 1
Kinross Gold<br> Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report
9) At the effective<br> date of the Technical Report, to the best of my knowledge, information, and belief, the sections<br> of the Technical Report for which I am responsible contain all scientific and technical information<br> that is required to be disclosed to make the Technical Report not misleading.
--- ---

Dated 27^th^ day of March, 2025

(Signedand Sealed) Kevin van Warmerdam

Kevin van Warmerdam, P.Eng.

Page 2

Exhibit 99.15

March 27, 2025

Consent of Qualified Person

TO: Ontario Securities Commission
AND TO: British Columbia Securities Commission
Alberta Securities Commission
Financial and Consumer Affairs Authority of Saskatchewan
Manitoba Securities Commission
Autorité des marchés financiers
New Brunswick Financial and Consumer Services Commission
Nova Scotia Securities Commission
Office of the Superintendent of Securities, Prince Edward Island
Office of the Superintendent of Securities, Service Newfoundland and
Labrador
(collectively, the “Canadian Securities Commissions”)

Re: Technical Report by Kinross GoldCorporation

Reference is made to the technical report titled “Tasiast Mine - Mauritania – National Instrument 43-101 Technical Report”, with an effective date of December 31, 2024, prepared for Kinross Gold Corporation and dated March 27, 2025 (the Technical Report).

Pursuant to Section 8.3 of National Instrument 43-101 – Standards of Disclosure for Mineral Projects, I, Kevin van Warmerdam, P. Eng., do hereby consent to the public filing of the Technical Report by Kinross Gold Corporation with the Canadian Securities Commissions.

(Signed and Sealed) Kevin vanWarmerdam

Kevin van Warmerdam, P. Eng.

Sr. Director, Engineering & Energy

Kinross Gold Corporation

Exhibit 99.16

CONSENT OF KEVIN VAN WARMERDAM

TO BEING NAMED AS A QUALIFIED PERSON

March 27, 2025

I hereby consent to the inclusions of the “Tasiast Mine - Mauritania – National Instrument 43-101 Technical Report” (“Technical Report”), effective date December 31, 2024 in the report on Form 6-K dated March 27, 2025 to be filed by Kinross Gold Corporation.

I also hereby consent to the incorporation by reference of the Technical Report into the Registration Statements on Form S-8 (Registration No. 333-262966 filed on February 24, 2022, Registration No. 333-217099 filed on April 3, 2017 and Registration Nos. 333-180824, 333-180823 and 333-180822 filed on April 19, 2012).

Sincerely,

/s/ Kevin van Warmerdam
Kevin van Warmerdam, P.Eng.

Exhibit 99.17

Kinross Gold<br> Corporation<br><br> <br>Tasiast Mine<br><br> <br>Mauritania<br><br> <br>NI 43-101 Technical<br> Report

JacobBrown

I, Jacob Brown, SME (RM), as an author of this report entitled “Tasiast Mine, Mauritania - National Instrument 43-101 Technical Report” with an effective date of December 31, 2024, prepared for Kinross Gold Corporation, do hereby certify that:

1) I am Director,<br> Resource and Mine Geology with Kinross Gold Corp. of 25 York Street, 17^th^floor, Toronto, Ontario.
2) I am a graduate<br> of University of Northern Colorado, Colorado in 2012 with a Geology Degree, and an MBA in<br> 2024 from the same university.
--- ---
3) I am a Registered<br> Member of the Society for Mining and, Metallurgy & Exploration (No. 04293143).<br> I have worked as a geologist for a total of 13 years since my graduation. My relevant experience<br> for the purpose of the Technical Report is:
--- ---
o Domestic<br> and international experience across North America, South America and Africa. Experienced<br> in performing and being directly responsible for multidisciplinary teams including open pit<br> mine geology, underground mine geology, resource estimation, exploration, short- and long-range<br> mine planning.
--- ---
4) I have read<br> the definition of "qualified person" set out in National Instrument 43-101 (NI<br> 43-101) and certify that by reason of my education, affiliation with a professional association<br> (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements<br> to be a "qualified person" for the purposes of NI 43-101.
--- ---
5) I have not<br> visited the Tasiast Mine.
--- ---
6) I am responsible<br> for Sections 11, 12, 14, and relevant portions of 1, 2, 25, 26, 27 of the Technical Report.
--- ---
7) I am not<br> independent of the Issuer applying the test set out in Section 1.5 of NI 43-101.
--- ---
8) I have had<br> prior involvement with the property that is the subject of the Technical Report.
--- ---
9) I have read<br> NI 43-101, and the Technical Report has been prepared in compliance with NI 43-101 and Form 43-101F1.
--- ---
Page 1
10) At the<br> effective date of the Technical Report, to the best of my knowledge, information, and belief,<br> the sections of the Technical Report for which I am responsible contain all scientific and<br> technical information that is required to be disclosed to make the Technical Report not misleading.

Dated 27^th^ day of March, 2025

(Signedand Sealed) Jacob Brown

Jacob Brown, SME (RM)

Page 2

Exhibit 99.18

March 27, 2025

Consent of Qualified Person

TO: Ontario Securities Commission
AND TO: British Columbia Securities Commission
Alberta Securities Commission
Financial and Consumer Affairs Authority of Saskatchewan
Manitoba Securities Commission
Autorité des marchés financiers
New Brunswick Financial and Consumer Services Commission
Nova Scotia Securities Commission
Office of the Superintendent of Securities, Prince Edward Island
Office of the Superintendent of Securities, Service Newfoundland and
Labrador
(collectively, the “Canadian Securities Commissions”)

Re: Technical Report by KinrossGold Corporation

Reference is made to the technical report titled “Tasiast Mine - Mauritania – National Instrument 43-101 Technical Report”, with an effective date of December 31, 2024, prepared for Kinross Gold Corporation and dated March 27, 2025 (the Technical Report).

Pursuant to Section 8.3 of National Instrument 43-101 – Standards of Disclosure for Mineral Projects, I, Jacob Brown, SME (RM), do hereby consent to the public filing of the Technical Report by Kinross Gold Corporation with the Canadian Securities Commissions.

(Signed and Sealed) Jacob Brown

Jacob Brown, SME (RM)

Director, Resource & Mine Geology

Kinross Gold Corporation

Exhibit 99.19

CONSENT OF JACOB BROWN

TO BEING NAMED AS A QUALIFIED PERSON

March 27, 2025

I hereby consent to the inclusions of the “Tasiast Mine - Mauritania – National Instrument 43-101 Technical Report” (“Technical Report”), effective date December 31, 2024 in the report on Form 6-K dated March 27, 2025 to be filed by Kinross Gold Corporation.

I also hereby consent to the incorporation by reference of the Technical Report into the Registration Statements on Form S-8 (Registration No. 333-262966 filed on February 24, 2022, Registration No. 333-217099 filed on April 3, 2017 and Registration Nos. 333-180824, 333-180823 and 333-180822 filed on April 19, 2012).

Sincerely,

/s/ Jacob Brown
Jacob Brown, SME (RM).