6-K

Osisko Development Corp. (ODV)

6-K 2023-11-08 For: 2023-11-30
View Original
Added on April 05, 2026

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 6-K

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 UNDER

THE SECURITIES EXCHANGE ACT OF 1934

For the month of November 2023

Commission File Number: 001-41369

Osisko Development Corp.

(Translation of registrant’s name into English)

1100 Avenue des Canadiens-de-Montréal, Suite 300

(Address of principal executive office)

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.

Form 20-F ☐ Form 40-F ☒

EXHIBIT INDEX

Exhibit
99.1 Interim Consolidated Financial Statements for the three and nine months ended September 30, 2023
99.2 Management’s Discussion and Analysis for the three and nine months ended September 30, 2023
99.3 Form 52-109F2 Certification of Interim Filings Full Certificate - CEO
99.4 Form 52-109F2 Certification of Interim Filings Full Certificate - CFO

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

Osisko Development Corp.
(Registrant)
Date: November 8, 2023 /s/ Alexander Dann
Alexander Dann
Chief Financial Officer and VP Finance

Exhibit 99.1

Graphic

OSISKO DEVELOPMENT CORP.

. . . . . . . . . . . . . . . . . .

Condensed Consolidated Financial Statements

For the three and nine months ended

September 30, 2023

​ ​

Osisko Development Corp.

Consolidated Statements of Financial Position

As at September 30, 2023 and December 31, 2022

(Unaudited)

(Expressed in thousands of Canadian dollars)

**** September 30, December 31,
2023 2022
**** Notes **** $
Assets
Current assets
Cash and cash equivalents 4 71,498 105,944
Amounts receivable 5 6,417 11,046
Inventories 6 11,467 17,641
Other current assets 7,027 6,621
96,409 141,252
Non-current assets
Investments in associates 7 8,353 8,833
Other investments 7 22,516 33,819
Mining interests 8 603,205 580,479
Property, plant and equipment 9 114,931 111,696
Exploration and evaluation 10 67,988 55,126
Other assets 11 39,861 36,994
953,263 968,199
Liabilities
Current liabilities
Accounts payable and accrued liabilities 12 22,436 31,106
Lease liabilities 493 1,208
Contract liability 15 361 941
Current portion of long-term debt 13 12,349 4,663
Environmental rehabilitation provision 16 19,000 9,738
Deferred consideration and contingent payments 14 3,380 3,386
58,019 51,042
Non-current liabilities
Long term debt 13 6,092 12,256
Lease liabilities 755 962
Contract liability 15 63,883 54,252
Environmental rehabilitation provision 16 53,678 66,032
Warrant liability 17 9,322 16,395
Deferred Consideration and contingent payments 14 10,578 13,252
Deferred income taxes 21,881 23,574
Other non-current liabilities 863
225,071 237,765
Equity
Share capital 18 1,079,640 1,032,786
Warrants 18 11,859 1,573
Contributed surplus 17,304 12,857
Accumulated other comprehensive income (7,904) 7,166
Deficit (372,707) (323,948)
728,192 730,434
953,263 968,199

All values are in US Dollars.

Going concern (Note 1)

APPROVED ON BEHALF OF THE BOARD
(signed) Sean Roosen, Director (signed), Charles Page, Director

The notes are an integral part of these condensed consolidated financial statements.

​ 2

Osisko Development Corp.

Consolidated Statements of Loss

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts)

Three months ended Nine months ended
September 30, September 30,
2023 2022 2023 2022
**** Notes **** $
Revenues **** 10,421 22,791 24,719 44,821
Operating expenses
Cost of sales 20 (10,087) (23,435) (25,900) (44,811)
Other operating costs 20 (6,759) (21,444) (20,788) (57,292)
General and administrative 21 (9,382) (8,710) (29,926) (26,451)
Exploration and evaluation, net of tax credits **** (646) (90) (1,686) (367)
Impairment of assets (81,000) (81,000)
Operating loss **** (16,453) (111,888) (53,581) (165,100)
Finance costs **** (3,748) (1,410) (10,594) (3,625)
Share of loss of associates **** (291) (103) (480) (575)
Change in fair value of warrant liability **** 17 12,978 2,565 6,968 21,946
Other income, net 22 849 7,104 13,416 21,280
Income (loss) before income taxes **** (6,665) (103,732) (44,271) (126,074)
Income tax recovery (expense) **** (458) 1 493 (1,489)
Net loss **** (7,123) (103,731) (43,778) (127,563)
Basic and diluted loss per share
Weighted average number of shares outstanding-basic and diluted **** 23 (0.08) (1.37) (0.53) (2.13)

All values are in US Dollars.

The notes are an integral part of these condensed consolidated financial statements.

​ 3

Osisko Development Corp.

Consolidated Statements of Comprehensive Loss

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Expressed in thousands of Canadian dollars)

Three months ended Nine months ended
September 30, September 30,
**** 2023 2022 **** 2023 **** 2022
**** $ $ $
Net loss (7,123) (103,731) (43,778) (127,563)
Other comprehensive income (loss) ****
Items that will not be reclassified to the consolidated statements of loss ****
Changes in fair value of financial assets at fair value through comprehensive income (loss) (2,494) (3,349) (9,555) (5,223)
Income tax effect 1,112 266 1,112 299
Share of other comprehensive loss of associates (294)
Items that may be reclassified to the consolidated statements of loss ****
Currency translation adjustments 4,480 14,413 (7,945) 17,657
Other comprehensive income (loss) 3,098 11,330 (16,388) 12,439
Comprehensive loss (4,025) (92,401) (60,166) (115,124)

All values are in US Dollars.

The notes are an integral part of these condensed consolidated financial statements.

​ 4

Osisko Development Corp.

Consolidated Statements of Cash Flows

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Expressed in thousands of Canadian dollars)

**** Three months ended Nine months ended
September 30, September 30,
**** **** 2023 **** 2022 **** 2023 **** 2022
Notes $ $ $ $
Operating activities
Net loss **** (7,123) (103,731) (43,778) (127,563)
Adjustments for:
Share-based compensation **** 1,865 2,192 6,263 5,389
Depreciation **** 21 2,646 2,569 9,030 9,883
Finance Costs **** 3,766 2,411 10,616 3,625
Gain on deemed disposal of associate **** (11,854)
Share of loss of associates **** 7 291 104 480 576
Change in fair value of financial assets at fair value through profit and loss **** 7 25 (6) 384
Change in fair value of warrant liability **** (12,978) (2,561) (6,968) (21,942)
Unrealized Foreign exchange gain 449 (8,336) (9,776) (10,433)
Deferred income tax expense (recovery) **** 458 (493) 1,490
Impairment of assets 81,000 81,000
Premium on flow-through shares **** (914)
Cumulative catch-up adjustment on contract liability **** (456) (192)
Proceeds from contract liability (384) 26,112 (1,824) 26,112
Other 3,114 3,246
Environmental rehabilitation obligations paid (1,119) (36) (2,044) 1,779
Net cash flows used in operating activities before changes in non-cash working capital items **** (9,446) (276) (35,446) (42,468)
Changes in non-cash working capital items 24 365 13,360 1,797 3,466
Net cash flows used in operating activities **** (9,081) 13,084 (33,649) (39,002)
Investing activities ****
Additions to Mining interests (6,215) (12,820) (30,800) (37,746)
Additions to Property, plant and equipment **** (1,549) (5,541) (12,983) (14,619)
Additions to Exploration and evaluation expenses (3,984) (1,555) (13,694) (2,241)
Proceeds on disposals of investments 7 2,445 353 3,447 21,634
Cash payments on deferred consideration and contingent payments **** (334)
Acquisition of other investments (212) (212)
Acquisition of Tintic, net of cash acquired **** (66,627)
Reclamation deposit **** 4,772 4,748 (13,371)
Other **** (765) (1,803)
Net cash flows used in investing activities **** (4,531) (20,540) (49,616) (114,985)
Financing activities ****
Proceeds from equity financings 51,756 255,543
Other issuance of common shares **** 33 114 102 114
Share issue expense **** (91) (3,365) (7,238)
Capital payments on lease liabilities **** (105) (396) (927) (6,295)
Long term debt 13 1,202 5,878 8,738
Repayment of long–term debt 13 (1,541) (1,082) (4,339) (3,662)
Withholding taxes on settlement of restricted units (337)
Net cash flows (used) provided by financing activities **** (1,704) (162) 48,768 247,200
Increase (decrease) in cash and cash equivalents before impact of exchange rate **** (15,316) (7,618) (34,497) 93,213
Effects of exchange rate changes on cash and cash equivalents **** (90) 4,454 51 6,518
Increase (decrease) in cash and cash equivalents **** (15,406) (3,164) (34,446) 99,731
Cash and cash equivalents – Beginning of period **** 86,904 136,302 105,944 33,407
Cash and cash equivalents – end of period **** 71,498 133,138 71,498 133,138

The notes are an integral part of these condensed consolidated financial statements.

​ 5

Osisko Development Corp.

Consolidated Statements of Changes in Equity

For the nine months ended September 30, 2023

(Unaudited)

(Expressed in thousands of Canadian dollars except number of shares)

Number of Accumulated
common other
shares Share Contributed comprehensive
**** Notes **** outstanding **** capital **** Warrants Surplus income (loss) Deficit Total
($) ($) ($) ($) ($) ($)
Balance – January 1, 2023 18 75,629,849 1,032,786 1,573 12,857 7,166 (323,948) 730,434
Net loss (43,778) (43,778)
Other comprehensive loss, net (16,388) (16,388)
Comprehensive loss (16,388) (43,778) (60,166)
Transfer of realized loss on financial assets at fair value through other comprehensive loss, net of taxes 1,318 (1,277) 41
Bought deal financing 18 7,841,850 45,545 6,211 51,756
Shares issued for the settlement of Deferred consideration 18 454,026 2,986 2,986
Shares issued to Williams Lake First Nation 18 10,000 75 75
Share issue expense 18 (2,988) (408) (3,396)
Change in fair value related to warrants modification 18 4,483 (4,483)
Share-based compensation
-Share options 3,250 3,250
-Restricted and deferred share units 3,286 3,286
Shares issued - employee share purchase plan 44,184 263 263
Share issued from RSU/DSU redemption 44,466 973 (2,089) 779 (337)
Balance – September 30, 2023 **** 84,024,375 1,079,640 11,859 17,304 (7,904) (372,707) 728,192

The notes are an integral part of these consolidated financial statements.

​ 6

Osisko Development Corp.

Consolidated Statements of Changes in Equity

For the nine months ended September 30, 2022

(Unaudited)

(Expressed in thousands of Canadian dollars except number of shares)

**** **** Number of Accumulated
common other
shares Share Contributed comprehensive
Notes outstanding capital Warrants Surplus income (loss) Deficit Total
($) ($) ($) ($) ($) ($)
Balance – January 1, 2022 18 44,400,854 714,373 6,436 6,764 (143,371) 584,202
Net loss (127,563) (127,563)
Other comprehensive loss 12,439 12,439
Comprehensive income 12,439 (127,563) (115,124)
Transfer of realized loss on financial assets at fair value through other comprehensive income, net of taxes (11,693) 11,693
Private placements – Brokered 18 7,752,917 101,873 1,628 103,501
Private placements – Non-Brokered 18 11,363,933 112,207 112,207
Share-issue costs (6,231) (55) (6,286)
Share-based compensation
-Share options 2,511 2,511
-Restricted and deferred share units 3,166 3,166
Shares issued - employee share purchase plan 25,778 310 310
Shares issued on Acquisition of Tintic 12,049,449 109,657 109,657
Share issued from RSU/DSU Redemption 27,651 608 (1,320) 406 (306)
Balance – September 30, 2022 **** 75,620,582 **** 1,032,797 **** 1,573 10,793 7,510 (258,835) 793,838

The notes are an integral part of these consolidated financial statements.

​ 7

Osisko Development Corp.

Notes to the Condensed Consolidated Financial Statements

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Tabular amounts expressed in thousands of Canadian dollars, except per share amounts)

1. Nature of operations and going concern

Osisko Development Corp. (“Osisko Development” or the “Company”) is a mineral exploration and development company focused on the acquisition, exploration and development of precious metals resource properties in North America. The common shares of Osisko Development began trading under the symbol ODV on the TSX Venture Exchange (“TSX-V”) on December 2, 2020 and on the New York Stock Exchange (“NYSE”) on May 27, 2022. Osisko Development is focused on exploring and developing its mining assets, including the Cariboo Gold Project in British Columbia, the San Antonio gold project in Mexico and the Trixie test mine in the USA.

The Company’s registered and business address is 1100, avenue des Canadiens-de-Montréal, suite 300, Montreal, Québec. The common shares outstanding presented have been retroactively adjusted to reflect the effect of the 3:1 share consolidation that took place on May 4, 2022. Common share warrants and per share amounts have been adjusted retroactively for the 3:1 share consolidation unless noted otherwise.

On September 30, 2023, the former parent Company, Osisko Gold Royalties (“OGR”) held an interest of 39.7% (compared to 44.1% as at December 31, 2022) in Osisko Development Corp.

The principal subsidiaries of the Company and their geographic locations at September 30, 2023 were as follows:

Entity **** Jurisdiction **** % ownership ****
Barkerville Gold Mines Ltd. (“Barkerville”) British Columbia 100 %
Sapuchi Minera, S. de R.L. de C.V. (“Sapuchi”) Mexico 100 %
Tintic Consolidated Metals LLC (“Tintic”) USA 100 %

These condensed consolidated financial statements have been prepared on the basis of accounting principles applicable to a going concern, which contemplates the realization of assets and settlement of liabilities in the normal course of business as they come due. In assessing whether the going concern assumption is appropriate, Management takes into account all available information about the future, which is at least, but not limited to twelve months from the end of the reporting period. As at September 30, 2023, the Company’s working capital was $38.4 million, which included cash and cash equivalent balance of $71.5 million. The Company also has an accumulated deficit of $373 million and incurred a loss of $44 million for the nine month period ended September 30, 2023

The working capital position as at September 30, 2023 will not be sufficient to meet the Company’s obligations, commitments and forecasted expenditures up to the period ending September 30, 2024. Management is aware, in making its assessment, of material uncertainties related to events and conditions that may cast a substantial doubt upon the Company's ability to continue as a going concern as described in the preceding paragraph, and accordingly, the appropriateness of the use of accounting principles applicable to a going concern. These condensed consolidated financial statements do not reflect the adjustments to the carrying values of assets and liabilities, expenses and financial position classifications that would be necessary if the going concern assumption was not appropriate. These adjustments could be material.

The Company’s ability to continue future operations and fund its planned activities is dependent on Management’s ability to secure additional financing in the future, which may be completed in several ways including, but not limited to, a combination of selling additional investments from its portfolio, project debt finance, offtake or royalty financing and other capital market alternatives. Failure to secure future financings may impact and/or curtail the planned activities for the Company, which may include, but are not limited to, the suspension of certain development activities and the disposal of certain investments to generate liquidity. While Management has been successful in securing financing in the past, there can be no assurance that it will be able to do so in the future or that these sources of funding or initiatives will be available to the Company or that they will be available on terms which are acceptable to the Company. If Management is unable to obtain new funding, the Company may be unable to continue its operations, and amounts realized for assets might be less than the amounts reflected in these condensed consolidated financial statements.

​ 8

Osisko Development Corp.

Notes to the Condensed Consolidated Financial Statements

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Tabular amounts expressed in thousands of Canadian dollars, except per share amounts)

2. Basis of presentation and Statement of compliance

These condensed interim consolidated financial statements have been prepared in accordance with the International Financial Reporting Standards as issued by the International Accounting Standards Board (“IASB”) (“IFRS”) and as applicable to the preparation of interim financial statements, including IAS 34 Interim Financial Reporting. Accordingly, certain disclosures included in the annual financial statements prepared in accordance with IFRS have been condensed or omitted and these condensed interim consolidated financial statements should be read in conjunction with the Company’s audited consolidated financial statements for the year ended December 31, 2022. The accounting policies, methods of computation and presentation applied in the preparation of these condensed interim consolidated financial statements are consistent with those of the previous financial year, unless otherwise noted.

. The Board of Directors approved these condensed interim consolidated financial statements on November 8, 2023.

3. New accounting standards and policies

New accounting policy

Cash and cash equivalents include cash on hand and short-term highly liquid investments with an initial maturity of three months or less that are readily convertible to known amounts of cash and which are exposed to an insignificant risk of changes in value.

New accounting standards and amendments

The following pronouncements to existing accounting standards were effective on January 1, 2023:

Amendment to IAS 12 Income taxes requires companies to recognize deferred tax on particular transactions that, on initial recognition, give rise to equal amounts of taxable and deductible temporary differences.
Narrow scope amendment to IAS 1 Presentation of Financial Statements to improve accounting policy disclosures.
--- ---
Narrow scope amendment to IAS 8 Accounting Policies, Changes in Accounting Estimates and Errors to distinguish changes in accounting estimates from changes in accounting policies.
--- ---

No material impact was identified in connection with the adoption of these amendments.

New accounting standards, amendments and interpretations not yet adopted

The Company has not yet adopted certain standards, interpretations to existing standards and amendments which have been issued but have an effective date of later than December 31, 2023. Some of these updates are not expected to have any significant impact on the Company and are therefore not discussed herein.

Classification of liabilities as current or non-current (Amendments to IAS 1)

The IASB has published amendments to IAS 1 (Classification of liabilities as current or non-current and non-current liabilities with covenants) which clarify the guidance on whether a liability should be classifies as either current or non-current. The amendments:

Clarify that the classification of liabilities as current or non-current should only be based on rights that are in place “at the end of the reporting period”;
Clarify that classification is unaffected by intentions or expectations about whether an entity will exercise its right to defer settlement of a liability; and
--- ---

9

Osisko Development Corp.

Notes to the Condensed Consolidated Financial Statements

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Tabular amounts expressed in thousands of Canadian dollars, except per share amounts)

Make clear that settlement includes transfers to the counterparty of cash, equity instruments, other assets or services that result in extinguishment of the liability.

In addition, the IASB confirmed that only covenants with which an entity must comply on or before the reporting date affect the classification of a liability as current or non-current. Covenants with which an entity must comply within twelve months of the reporting date (“Future Covenants”) do not affect a liability’s classification at the reporting date. However, when non-current liabilities are subject to Future Covenants, entities will need to disclose information in the notes that enables users of the condensed consolidated financial statements to understand the risk that the liability could become repayable within twelve months of the reporting date.

The amendments to IAS 1 are effective for annual periods beginning on or after January 1, 2024 and should be applied retrospectively in accordance with IAS 8. The adoption of the amendments to IAS 1 is expected to impact the classification of the Warrant liability from non-current to current liability.

4. Cash and cash equivalents

As at September 30, 2023 and December 31 2022, the consolidated cash and cash equivalents position was as follows:

**** September 30, December 31,
2023 2022
**** $
Cash and cash equivalents held in Canadian dollars 29,058 32,444
Cash and cash equivalents held in U.S. dollars 31,355 54,242
Cash and cash equivalents held in U.S. dollars (Canadian equivalent) 42,392 73,465
Cash held and cash equivalents in Mexican Pesos 645 565
Cash held and cash equivalents in Mexican Pesos (Canadian equivalent) 48 35
Total cash and cash equivalents 71,498 105,944

All values are in US Dollars.

5. Amounts receivable
--- --- --- ---
**** September 30, December 31,
2023 2022
**** $
Trade receivables 3,711 1,777
Exploration tax credits 1,579 8,360
Sales taxes 743 889
Interest income receivable 133 20
Other 251
6,417 11,046

All values are in US Dollars.

​ 10

Osisko Development Corp.

Notes to the Condensed Consolidated Financial Statements

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Tabular amounts expressed in thousands of Canadian dollars, except per share amounts)

6. Inventories
--- --- --- ---
**** September 30, December 31,
2023 2022
**** $
Ore in stockpiles 5,943
Tailings 4,135 2,616
Gold-in-circuit inventory 637 4,451
Refined precious metals 1,139 37
Supplies and other 5,556 4,594
Total inventories 11,467 17,641

All values are in US Dollars.

Refined precious metals, gold-in-circuit and ore in stockpiles are measured at the lower of weighted average production cost and net realizable value. Net realizable value is calculated as the difference between the estimated selling price and estimated costs to complete processing into a saleable form plus variable selling expenses. For the nine-month period ended September 30, 2023, an amount of $5,625,000 was recorded to evaluate the inventories to net realizable value. Production costs include the cost of materials, labour, mine site production overheads and depreciation to the applicable stage of processing.

7. Investments in associates and other investments

Investments in associates

**** September 30, December 31,
2023 2022
**** $
Balance – Beginning of period 8,833 12,964
Transfer to Other investments (15,344)
Share of loss and comprehensive loss, net (480) (641)
Gain on deemed disposal^(i)^ 11,854
Balance – End of period 8,353 8,833

All values are in US Dollars.


(i) In 2022, the gain on deemed disposal is related to an investment in an associate that was transferred to other assets as the Company has considered that it has lost its significant influence over the investee.

11

Osisko Development Corp.

Notes to the Condensed Consolidated Financial Statements

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Tabular amounts expressed in thousands of Canadian dollars, except per share amounts)

Other investments

**** September 30, December 31,
2023 2022
**** $
Fair value through profit or loss (warrants & convertible loan)
Balance – Beginning of period 18 6,952
Acquisitions 4,438
Exercises (117)
Acquisition of Tintic (10,827)
Change in fair value 6 (480)
Foreign exchange 52
Balance – End of period 24 18
Fair value through other comprehensive income (shares)
Balance – Beginning of period 33,801 42,564
Acquisitions 329
Consideration received from disposal of exploration properties 1,694
Disposals (3,447) (22,585)
Change in fair value (9,556) (1,849)
Transfer from associates 15,342
Balance – End of period 22,492 33,801
Total 22,516 33,819

All values are in US Dollars.

Other investments comprise of common shares and warrants, almost exclusively from publicly traded companies.

​ 12

Osisko Development Corp.

Notes to the Condensed Consolidated Financial Statements

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Tabular amounts expressed in thousands of Canadian dollars, except per share amounts)

8. Mining interests
--- --- --- ---
**** September 30, December 31,
2023 2022
**** $
Cost – Beginning of period 583,669 475,621
Acquisition of Tintic 169,175
Additions 22,731 49,297
Mining tax credit 152 (6,404)
Asset retirement obligation (4,532) 9,248
Depreciation capitalized 3,442 1,141
Share-based compensation capitalized 217 530
Impairment (140,000)
Other adjustments 5,579
Currency translation adjustments 2,225 19,482
Cost – End of period 607,904 583,669
Accumulated depreciation – Beginning of period 3,190
Depreciation 1,036 2,964
Currency translation adjustments 473 226
Accumulated depreciation – End of period 4,699 3,190
Cost 607,904 583,669
Accumulated depreciation (4,699) (3,190)
Net book value 603,205 580,479

All values are in US Dollars.

​ 13

Osisko Development Corp.

Notes to the Condensed Consolidated Financial Statements

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Tabular amounts expressed in thousands of Canadian dollars, except per share amounts)

9. Property, plant and equipment
--- --- --- --- --- --- ---
**** Machinery
Land and and Construction- September 30, December 31,
Buildings Equipment in-progress 2023 2022
**** $
Cost– Beginning of period 27,980 80,208 23,721 131,909 93,241
Acquisition of Tintic 13,054
Additions 1,122 7,989 3,722 12,833 29,409
Disposals (126) (101) (227) (1,351)
Write-off (108) (138) (246) (5,455)
Other adjustments (220) (92) (312) (896)
Transfers 2,030 690 (2,720)
Currency translation adjustments 67 1,938 1,217 3,222 3,907
Cost – End of period 30,871 90,469 25,839 147,179 131,909
Accumulated depreciation – Beginning of period 4,468 15,745 20,213 9,529
Depreciation 2,312 9,003 11,315 12,869
Disposal (19) (19) (192)
Write-off (13) (78) (91) (2,687)
Currency translation adjustments 55 775 830 694
Accumulated depreciation – End of period 6,822 25,426 32,248 20,213
Net book value 24,049 65,043 25,839 114,931 111,696

All values are in US Dollars.

Property, plant and equipment includes right-of-use assets with a net carrying value of $3.3 million as at September 30, 2023 ($3.8 million as at December 31, 2022).

10. Exploration and evaluation
--- --- --- ---
September 30, December 31,
2023 2022
**** () ( $ )
Net book value - Beginning of period **** 55,126 3,635
Acquisition of Tintic **** 38,508
Additions **** 12,562 10,786
Depreciation capitalized **** 337 80
Other adjustments **** (460)
Currency translation adjustments **** (37) 2,577
Net book value – End of period **** 67,988 55,126
Cost **** 168,195 155,333
Accumulated impairment **** (100,207) (100,207)
Net book value – End of period **** 67,988 55,126

All values are in US Dollars.

​ 14

Osisko Development Corp.

Notes to the Condensed Consolidated Financial Statements

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Tabular amounts expressed in thousands of Canadian dollars, except per share amounts)

  1. Other Assets
**** September 30, December 31,
2023 2022
**** $
Sales tax recoverable 20,411 17,467
Reclamation deposits 12,647 16,761
Deferred financing fees 94
Other 6,709 2,766
**** 39,861 36,994

All values are in US Dollars.

12. Accounts payable and accrued liabilities
--- --- --- ---
**** September 30, December 31,
2023 2022
**** $
Trade payables **** (11,826) 18,057
Other payables **** (5,053) 5,005
Income taxes payable **** 716
Accrued liabilities **** (5,557) 7,328
**** (22,436) 31,106

All values are in US Dollars.

13. Long-term debt
--- --- --- ---
**** September 30, December 31,
2023 2022
**** () ( $ )
Balance – Beginning of period **** 16,919 3,764
Additions- mining equipment financing **** 5,878 17,772
Repayment of liabilities **** (4,337) (4,860)
Currency translation adjustments **** (19) 243
Balance – End of period **** 18,441 16,919
Current long–term debt **** 12,349 4,663
Non-current long–term debt **** 6,092 12,256
**** 18,441 16,919

All values are in US Dollars.

​ 15

Osisko Development Corp.

Notes to the Condensed Consolidated Financial Statements

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Tabular amounts expressed in thousands of Canadian dollars, except per share amounts)

14. Deferred consideration and contingent payments
--- --- --- ---
**** September 30, December 31,
2023 2022
**** () ( $ )
Balance – Beginning of period **** 16,638
Additions **** 15,109
Interest Capitalized **** 725 577
Repayment **** (334)
Settlement **** (2,986)
Foreign exchange **** (85) 952
Balance – End of period **** 13,958 16,638
Current portion of deferred consideration and contingent payments **** 3,380 3,386
Non-current portion of deferred consideration and contingent payments **** 10,578 13,252
**** 13,958 16,638

All values are in US Dollars.

15. Royalty and Contract liability

OGR and through its wholly owned subsidiaries, holds a 5% NSR royalty on the Cariboo Gold Project (“Cariboo”) and Bonanza Ledge properties, owned by Barkerville.The Cariboo and Bonanza Ledge properties 5% NSR royalty is perpetual and is secured by a debenture on all of Barkerville movable and immovable assets, including Barkerville’s interest in the property and mineral rights, in an amount of not less than $150 million. The security shall be first ranking, subject to permitted encumbrances.

On November 20, 2020, the Company’s wholly owned subsidiary Sapuchi completed a gold and silver stream agreement with Osisko Bermuda Ltd, a subsidiary of OGR, for US$15.0 million ($19.1 million). An amount of US$10.5 million was contributed in November 2020 and the remaining US$4.5 million was paid in February 2021.

Under the terms of the stream agreement, Osisko Bermuda Ltd will purchase 15% of the payable gold and silver from the San Antonio gold project at a price equal to 15% of the daily per ounce gold and silver market price. The initial term of the stream agreement is for 40 years and can be renewed for successive 10-year periods. The stream is also secured with (i) a first priority lien in all of the collateral now owned or hereafter acquired; (ii) a pledge by Osisko Development of its shares of Sapuchi Minera Holdings Two B.V. and (iii) a guarantee by Osisko Development. The interest rate used to calculate the accretion on the contract liability’s financing component is 24%.

On September 26, 2022, Tintic completed a metals stream agreement with Osisko Bermuda Ltd, for US$20 million ($26.1 million).

Under the terms of the stream agreement, Osisko Bermuda Ltd will receive 2.5% of the refined metal production from Tintic until 27,150 ounces of refined gold have been delivered, and thereafter Osisko Bermuda Ltd will receive 2.0% of the refined metal production from Tintic. Osisko Bermuda Ltd will make ongoing cash payments to Tintic equal to 25% of the applicable spot metal price on the business day immediately preceding the date of delivery for each ounce of refined metal delivered pursuant to the stream agreement. The interest rate used to calculate the accretion on the contract liability’s financing component is 5%. 16

Osisko Development Corp.

Notes to the Condensed Consolidated Financial Statements

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Tabular amounts expressed in thousands of Canadian dollars, except per share amounts)

The movement of the contract liability is as follows:

**** September 30, December 31,
2023 2022
**** () ( $ )
Balance – Beginning of period **** 55,193 24,820
Deposits **** 26,112
Proceeds from contract liability (1,822) (2,792)
Accretion on the contract liability’s financing component **** 7,532 7,377
Cumulative catch-up adjustment **** (204) (4,362)
Currency translation adjustment **** 3,545 4,038
Balance – End of period **** 64,244 55,193
Current liabilities **** 361 941
Non-current liabilities **** 63,883 54,252
**** 64,244 55,193

All values are in US Dollars.

Under IFRS 15, the stream agreements are considered to have a significant financing component. The Company therefore records notional non-cash interest.

16. Environmental rehabilitation provision
--- --- --- ---
**** September 30, December 31,
2023 2022
**** () ( $ )
Balance – Beginning of period **** 75,770 53,236
Acquisition of Tintic **** 4,599
New liabilities **** (137) 22,353
Revision of estimates **** (4,318) (5,637)
Accretion expense **** 2,242 3,223
Settlement of liabilities / payment of liabilities **** (2,042) (3,409)
Currency translation adjustment **** 1,163 1,405
Balance – End of period **** 72,678 75,770
Current liabilities **** 19,000 9,738
Non-current liabilities **** 53,678 66,032
**** 72,678 75,770

All values are in US Dollars.

The environmental rehabilitation provision represents the legal and contractual obligations associated with the eventual closure of the Company’s mining interests, property, plant and equipment and exploration and evaluation assets. As at September 30, 2023, the estimated inflation-adjusted undiscounted cash flows required to settle the environmental rehabilitation amounts to $84.9 million. The weighted average actualization rate used is 4.75% and the disbursements are expected to be made between 2023 and 2030 as per the current closure plans.

17. Warrant Liability

The Company completed a non-brokered private placement, issuing non-brokered subscription receipts on May 27, 2022, each non-brokered subscription receipt holder received one unit comprised of one common share and one common share purchase warrant, upon the listing of Osisko Development’s common shares on the NYSE.  Each warrant entitling the holder to purchase one additional common share at a price of USD$18.00 per common share for 17

Osisko Development Corp.

Notes to the Condensed Consolidated Financial Statements

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Tabular amounts expressed in thousands of Canadian dollars, except per share amounts)

a period of 5 years from the date of issue. On March 17, 2023, the Company received the required approvals to reduce the exercise price of the common share purchase warrants issued in 2022 under the non-brokered private placements from US$18.00 to US$10.70 per share.

These warrants include an embedded derivative as they are exercisable in U.S. dollars and, therefore, fail the “fixed for fixed” requirements prescribed in IAS 32 Financial Instruments: presentation. As a result, they are classified as a liability and measured at fair value. The liability is revalued at its estimated fair value using the Black-Scholes model at the end of each reporting period, and the variation in the fair value is recognized on the consolidated statements of loss under other gains (losses), net.

September 30, December 31,
2023 2022
$ $
Fair value through profit or loss (warrants)
Balance – Beginning of period 16,395
Additions 39,841
Change in fair value (6,968) (25,008)
Foreign exchange (104) 1,562
Balance – End of period 9,322 16,395

In absence of quoted market prices, the valuation of the warrants exercisable in USD, when granted and re-measured at fair value is determined by the Black-Scholes option pricing model based on the following range of assumptions:

September 30, December 31, ****
2023 2022
Dividend per share
Expected volatility 66.7 % 69.0 %
Risk-free interest rate 4.62 % 4.00 %
Expected life 3.6 years 4.4 years
Exercise price (USD) $ 10.70 $ 18.00
Share price (USD) $ 2.94 $ 4.30

18. Share Capital and Warrants

Shares

Authorized: unlimited number of common shares, without par value

Issued and fully paid: 84,024,375 common shares

Employee Share Purchase Plan

The Company offers an employee share purchase plan to its employees. Under the terms of the plan, the Company contributes an amount equal to 60% of the eligible employee’s contribution towards the acquisition of common shares from treasury on a quarterly basis. Under this plan, no employee shall acquire common shares which exceed 10% of the issued and outstanding common shares of the issuer at the time of the purchase of the common shares. 18

Osisko Development Corp.

Notes to the Condensed Consolidated Financial Statements

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Tabular amounts expressed in thousands of Canadian dollars, except per share amounts)

2023 Bought Deal Financing

On March 2, 2023, the Company completed a public offering on a bought deal basis issuing 7,841,850 units at a price of $6.60 per unit for aggregate gross proceeds of $51.8 million (the “Bought Deal Financing”). Each unit is comprised of one common share and one warrant, with each warrant entitling the holder to purchase one additional common share at a price of $8.55 per common share for a period of 3 years following the closing date of the Bought Deal Financing. The fair value of the warrants issued was evaluated using the residual method and were valued at $6.2 million. Share issue expense related to the Bought Deal Financing amounted to $3.4 million of which $3.2 million were paid during the nine months ended September 30, 2023 and have been allocated against the common shares and warrants issued.

Participation Agreement with Williams Lake First Nation

On March 2, 2023, the Company issued 10,000 common shares in accordance with the terms of a participation agreement dated June 10, 2022 with Williams Lake First Nation relating to the Company’s Cariboo Gold Project. The fair value of the common shares issued is calculated with reference to the share price of the Company’s common shares. 19

Osisko Development Corp.

Notes to the Condensed Consolidated Financial Statements

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Tabular amounts expressed in thousands of Canadian dollars, except per share amounts)

Warrants

The following table summarizes the Company’s movements for the warrants outstanding:

September 30, 2023 December 31, 2022
Weighted Weighted
Number of average Number of average
**** Warrants **** exercise price Warrants^(iii)^ exercise price
**** $ $
Balance – Beginning of period **** 24,046,640 **** 17.86 4,929,791 30.00
Issued – Brokered private placement **** 7,752,916 22.80
Issued – Non-brokered private placement^(i)^ **** 11,363,933 13.53
Issued – Bought deal financing^(ii)^ 7,841,850 8.55
Balance – End of period **** 31,888,490 15.57 24,046,640 17.86

The outstanding warrants have the following maturity dates and exercise terms:

Graphic


(i) Exercise price of warrants issued in non-brokered private placement is in USD.
(ii) On March 17, 2023, the Company received the required approvals to reduce the exercise price of the common share purchase warrants issued in 2022 under the brokered and non-brokered private placements. The exercise price to purchase one additional common share was reduced from $22.80 to $14.75 for the brokered private placement and from US$18.00 to US$10.70 for the non-brokered private placements.
--- ---

The increase in fair value of the amended share purchase warrants classified as equity instruments was estimated to $4.5 million and recorded directly in the Deficit, considering the fair value of the original warrants left at the date of the modification, using the Black-Scholes option pricing model based on the following assumptions:

Dividend per share
Expected volatility 66 %
Risk-free interest rate 2.9 %
Expected life 4 years
Share price $ 6.20

​ 20

Osisko Development Corp.

Notes to the Condensed Consolidated Financial Statements

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Tabular amounts expressed in thousands of Canadian dollars, except per share amounts)

(iii) The number of warrants presented for 2022 have been adjusted to reflect the effect of the 3:1 share consolidation that took place on May 4, 2022. The consolidation is not reflected for 20202 and 2021 warrants.
19. Share-based compensation
--- ---

Share options

The Company offers a share option plan to directors, officers, management, employees and consultants.

The following table summarizes information about the movement of the share options outstanding under the Company’s plan:

September 30, 2023 December 31, 2022
Weighted Weighted
average average
Number of exercise Number of exercise
**** options **** price **** options^(i)^ **** price
$ **** $
Balance – Beginning of period **** 1,812,450 11.52 697,841 21.21
Granted **** 1,202,400 6.59 1,245,400 6.43
Forfeited **** (215,494) 9.01 (130,791) 14.74
Balance – End of period **** 2,799,356 9.60 1,812,450 11.52
Options exercisable – End of period **** 531,242 13.75 205,229 21.32

(i) The number of options presented for 2022 have been adjusted to reflect the effect of the 3:1 share consolidation that took place on May 4, 2022.

The following table summarizes the share options outstanding as at September 30, 2023:

**** **** Options outstanding **** Options exercisable
Weighted Weighted
average average
Exercise remaining contractual remaining contractual
Grant date **** price **** Number **** life (years) Number **** life (years)
$
December 22, 2020 22.86 327,199 2.23 112,051 2.23
February 5, 2021 24.30 10,533 2.35 3,511 2.35
June 23, 2021 21.30 160,030 2.73 107,079 2.73
August 16, 2021 16.89 34,533 2.88 24,135 2.88
November 12, 2021 16.20 37,894 3.12 12,633 3.12
June 30, 2022 6.49 774,167 3.75 271,833 3.75
November 18, 2022 6.28 282,700 4.13 - -
April 3, 2023 6.59 1,172,300 4.51 - -
**** 9.60 2,799,356 **** 3.85 531,242 3.16

​ 21

Osisko Development Corp.

Notes to the Condensed Consolidated Financial Statements

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Tabular amounts expressed in thousands of Canadian dollars, except per share amounts)

The options, when granted, are accounted for at their fair value determined by the Black-Scholes option pricing model based on the vesting period and on the following weighted average assumptions:

**** September 30, 2023 **** December 31, 2022
Dividend per share
Expected volatility **** 66% 64%
Risk-free interest rate **** 3.2% 3.3%
Expected life **** 48 months 47 months
Weighted average share price $ 6.59 $ 6.43
Weighted average fair value of options granted $ 3.43 $ 3.27

The expected volatility is estimated by benchmarking with companies having businesses similar to Osisko Development. The historical volatility of the common share price of these companies was used for benchmarking back from the date of grant and for a period corresponding to the expected life of the options.

The fair value of the share options is recognized as compensation expense over the vesting period. During the three and nine months ended September 30, 2023, the total share-based compensation related to share options granted under the Osisko Development’s plan amounted to $1.1 million and $3.3 million, respectively ($1.1 million and $2.5 million for the three and nine months ended September 30, 2022, respectively).

Deferred and restricted share units (“DSU” and “RSU”)

The following table summarizes information about the DSU and RSU movements:

September 30, 2023 December 31, 2022
**** DSU **** RSU **** DSU^(i)^ **** RSU
Balance – Beginning of period **** 206,426 **** 1,054,194 79,781 345,377
Granted **** 99,170 **** 261,900 137,528 794,500
Settled **** **** (95,459) (10,883) (49,118)
Forfeited **** **** (99,484) (36,565)
Balance – End of period **** 305,596 **** 1,121,151 206,426 1,054,194
Balance – Vested **** 206,426 68,898

(i) The number of DSU/RSU presented for 2022 have been adjusted to reflect the effect of the 3:1 share consolidation that took place on May 4, 2022.
(ii) Unless otherwise decided by the board of directors of the Company, the DSU vest the day prior to the next annual general meeting and are payable in common shares, cash or a combination of common shares and cash, at the sole discretion of the Company, to each director when he or she leaves the board or is not re-elected. The value of the payout is determined by multiplying the number of DSU expected to be vested at the payout date by the closing price of the Company’s shares on the day prior to the grant date. The fair value is recognized over the vesting period. On the settlement date, one common share will be issued for each DSU, after deducting any income taxes payable on the benefit earned by the director that must be remitted by the Company to the tax authorities.
--- ---

The total share-based compensation expense related to the Osisko Development’s DSU and RSU plans for the three and nine months ended September 30, 2023 amounted to $0.9 million and $3.3 million, respectively ($1.1 million and $3.2 million for the three and nine months ended September 30, 2022, respectively).

​ 22

Osisko Development Corp.

Notes to the Condensed Consolidated Financial Statements

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Tabular amounts expressed in thousands of Canadian dollars, except per share amounts)

Based on the closing price of the common shares at September 30, 2023 ($3.90), and considering a marginal income tax rate of 53.3%, the estimated amount that Osisko Development is expected to transfer to the tax authorities to settle the employees’ tax obligations related to the vested RSU and DSU to be settled in equity amounts to $ 0.4 million ($0.2 million as at December 31, 2022) and to $2.9 million based on all RSU and DSU outstanding ($3.9 million as at December 31, 2022).

20. Cost of sales and other operating costs
--- --- --- --- --- --- --- ---
**** Three months ended **** Nine months ended
September 30, September 30,
2023 2022 2023 2022
**** ( $ ) ( $ ) () ( $ )
Salaries and benefits 3,502 5,198 9,197 14,259
Share-based compensation **** (94) 26 93 211
Royalties **** 256 254 719 1,242
Contract Services **** 3,195 14,259 9,160 36,579
Raw materials and consumables **** 3,306 4,460 7,980 13,879
Operational overhead and write-downs(Note 6) **** 4,104 17,011 10,684 25,050
Depreciation **** 2,577 3,671 8,855 10,883
**** 16,846 44,879 46,688 102,103

All values are in US Dollars.

21. General and administrative expenses
--- --- --- --- --- --- --- --- ---
**** Three months ended **** Nine months ended
September 30, September 30,
2023 2022 2023 2022
( $ ) ( $ ) ( $ ) ( $ )
Salaries and benefits 3,724 2,517 10,977 6,670
Share-based compensation **** 1,959 2,176 6,171 5,163
Insurance **** 1,253 1,247 4,302 2,447
Depreciation **** 48 41 175 121
Transaction costs **** 1,046 5,598
Legal and other Consulting fees 2,869 213 6,406 2,998
NYSE and TSX 426 589 1,246 655
Other **** (897) 880 649 2,799
**** 9,382 8,710 29,926 26,451

22. Other income, net
--- --- --- --- --- --- --- --- ---
**** Three months ended **** Nine months ended
September 30, September 30,
2023 **** 2022 2023 **** 2022
( $ ) ( $ ) ( $ ) ( $ )
Interest income, net **** 1,270 443 3,641 960
Foreign exchange gain (loss) **** 745 6,267 9,822 8,327
Premium on flow-through shares **** 914
Gain on deemed disposal of investment **** 11,854
Other **** (1,166) 394 (47) (775)
**** 849 7,104 13,416 21,280

​ 23

Osisko Development Corp.

Notes to the Condensed Consolidated Financial Statements

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Tabular amounts expressed in thousands of Canadian dollars, except per share amounts)

23. Loss per share
--- --- --- --- --- --- --- --- ---
**** Three months ended **** Nine months ended
September 30, September 30,
2023 **** 2022 2023 **** 2022
Net loss attributable to shareholders of the Company (7,123) (103,731) (43,778) (127,563)
Basic and diluted weighted average number of common shares outstanding 83,997,968 75,615,861 81,919,028 59,810,489
Net loss per share, basic and diluted (0.08) (1.37) (0.53) 2.13

The weighted average basic and diluted shares outstanding for 2022 presented have been adjusted to reflect the effect of the 3:1 share consolidation that took place on May 4, 2022.

Excluded from the calculation of the diluted loss per share are all common share purchase warrants and stock options, as their effect would be anti-dilutive.

24. Supplementary cash flows information
--- --- --- --- --- --- --- --- ---
**** Three months ended **** Nine months ended
September 30, September 30,
2023 **** 2022 2023 **** 2022
( $ ) ( $ ) ( $ ) ( $ )
Changes in non-cash working capital items
Decrease (increase) in amounts receivable **** (1,396) 1,675 5,693 870
Decrease (Increase) in inventory **** (292) 15,383 1,030 9,438
Increase in other current assets **** (111) (5,694) 47 (8,723)
Decrease in accounts payable and accrued liabilities **** 2,164 1,996 (4,973) 1,881
365 13,360 1,797 3,466

​ 24

Osisko Development Corp.

Notes to the Condensed Consolidated Financial Statements

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Tabular amounts expressed in thousands of Canadian dollars, except per share amounts)

25. Fair value of financial instruments

The following table provides information about financial assets and liabilities measured at fair value in the consolidated statements of financial position and categorized by level according to the significance of the inputs used in making the measurements.

Level 1– Unadjusted quoted prices in active markets for identical assets or liabilities;

Level 2– Inputs other than quoted prices included in Level 1 that are observable for the asset or liability, either directly (that is, as prices) or indirectly (that is, derived from prices); and

Level 3–Inputs for the asset or liability that are not based on observable market data (that is, unobservable inputs).

September 30, 2023
Level 1 Level 2 Level 3 Total
$ $ $ $
Recurring measurements
Financial assets at fair value through profit or loss ^^​ ^^​ ^^​ ^^​ ^^​ ^^​ ^^​
Convertible loan receivable **** **** ****
Warrants on equity securities
Publicly traded mining exploration and development companies
Precious metals **** **** 24 **** 24
Other minerals **** **** ****
Financial assets at fair value through other comprehensive loss
Equity securities
Publicly traded mining exploration and development companies
Precious metals 5,882 **** **** **** 5,882
Other minerals 16,610 **** **** **** 16,610
22,492 **** **** 24 **** 22,516

December 31, 2022
Level 1 Level 2 Level 3 Total
$
Recurring measurements
Financial assets at fair value through profit or loss ^^​
Convertible loan receivable
Warrants on equity securities
Publicly traded mining exploration and development companies
Precious metals 18 18
Other minerals
Financial assets at fair value through other comprehensive loss
Equity securities
Publicly traded mining exploration and development companies
Precious metals 9,537 9,537
Other minerals 24,264 24,264
33,801 18 33,819

All values are in US Dollars.

During the period ended September 30, 2023 and 2022 there were no transfers among Level 1, Level 2 and Level 3. 25

Osisko Development Corp.

Notes to the Condensed Consolidated Financial Statements

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Tabular amounts expressed in thousands of Canadian dollars, except per share amounts)

The following table presents the changes in the Level 3 investments (warrants and convertible loan) for the three months ended September 30, 2023 and the year ended December 31, 2022:

**** September 30, December 31,
2023 2022
$ $
Balance – Beginning of period 18 6,952
Acquisitions 4,438
Warrants exercised (117)
Acquisition of Tintic (10,827)
Change in fair value – warrants exercised ^(i)^ 6 49
Change in fair value – expired ^(i)^ (287)
Change in fair value – held at the end of the year ^(i)^ (241)
Foreign exchange 51
Balance – End of period 24 18

(i)Recognized in the consolidated statements of loss under other income, net.

The fair value of the financial instruments classified as Level 3 depends on the nature of the financial instruments.

The fair value of the warrants on equity securities of publicly traded mining exploration and development companies and the convertible debentures, classified as Level 3, is determined using the Black-Scholes option pricing model or discounted cash flows. The main non-observable input used in the model is the expected volatility. An increase/decrease in the expected volatility used in the models of 10% would lead to an insignificant variation in the fair value of the warrants as at September 30, 2023 and December 31, 2022.

Financial instruments not measured at fair value on the consolidated statements of financial position

Financial instruments that are not measured at fair value on the consolidated statement of financial position are represented by cash and cash equivalents, trade receivables, amounts receivable from associates and other receivables, notes receivable, accounts payable and accrued liabilities and long-term debt. The fair values of cash and cash equivalents, trade receivables, amounts receivable from associates and other receivables, accounts payable and accrued liabilities and short-term debt approximate their carrying values due to their short-term nature. The carrying value of the long-term debt approximates its fair value given that its interest rates are similar to the rates the Company would obtain under similar conditions at the reporting date.

​ 26

Osisko Development Corp.

Notes to the Condensed Consolidated Financial Statements

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Tabular amounts expressed in thousands of Canadian dollars, except per share amounts)

26. Segmented information

The chief operating decision-maker organizes and manages the business under geographic segments, being the acquisition, exploration and development of mineral properties. The assets related to the exploration, evaluation and development of mining projects are located in Canada, in Mexico, and in the USA and are detailed as follows as at September 30, 2023 and December 31, 2022:

September 30, 2023
Canada Mexico USA Total
**** $
Other assets (non-current) 15,711 20,430 3,720 39,861
Mining interest 383,837 18,599 200,769 603,205
Property, plant and equipment 60,854 21,760 32,317 114,931
Exploration and evaluation assets 3,653 64,335 67,988
Total non-current assets (Excluding investments) 464,055 60,789 301,141 825,985

All values are in US Dollars.

December 31, 2022
Canada Mexico USA Total
$
Other assets (non-current) 16,252 17,485 3,257 36,994
Mining interest 372,061 16,822 191,596 580,479
Property, plant and equipment 63,655 21,688 26,353 111,696
Exploration and evaluation assets 3,653 51,473 55,126
Total non-current assets (Excluding investments) 455,621 55,995 272,679 784,295

All values are in US Dollars. 27

Osisko Development Corp.

Notes to the Condensed Consolidated Financial Statements

For the three and nine months ended September 30, 2023 and 2022

(Unaudited)

(Tabular amounts expressed in thousands of Canadian dollars, except per share amounts)

**** Canada Mexico USA Total
$ $ $ $
For the three months ended September 30, 2023
Revenues 3,266 **** 2,050 **** 5,105 **** 10,421
Cost of Sales (3,713) **** (1,610) **** (4,764) **** (10,087)
Other operating costs (4,368) **** (2,412) **** 21 **** (6,759)
General and administrative expenses (5,696) **** (587) **** (3,099) **** (9,382)
Exploration and evaluation (586) **** (60) **** **** (646)
Operating Gain (Loss) (11,097) **** (2,619) **** (2,737) **** (16,453)
For the three months ended September 30, 2022
Revenues 2,262 12,876 7,653 22,791
Cost of Sales (2,262) (12,876) (8,297) (23,435)
Other operating costs (19,564) (1,862) (18) (21,444)
General and administrative expenses (7,425) (151) (1,134) (8,710)
Exploration and evaluation (90) (90)
Impairment of assets (81,000) (81,000)
Operating Gain (Loss) (27,079) (83,013) (1,796) (111,888)

**** Canada Mexico USA Total
$ $ $ $
For the nine months ended September 30, 2023 **** **** **** **** **** **** ****
Revenues 6,401 8,028 **** 10,290 **** 24,719
Cost of Sales (6,344) **** (8,690) **** (10,866) **** (25,900)
Other operating costs (17,691) **** (2,818) **** (279) **** (20,788)
General and administrative expenses (22,040) **** (1,950) **** (5,936) **** (29,926)
Exploration and evaluation (1,530) **** (156) **** **** (1,686)
Operating Gain (Loss) (41,204) **** (5,586) **** (6,791) **** (53,581)
For the nine months ended September 30, 2022
Revenues 20,416 12,876 11,529 44,821
Cost of Sales (20,416) (12,876) (11,519) (44,811)
Other operating costs (43,826) (13,448) (18) (57,292)
General and administrative expenses (23,153) (2,059) (1,239) (26,451)
Exploration and evaluation (367) (367)
Impairment of assets (81,000) (81,000)
Operating Gain (Loss) (67,346) (96,507) (1,247) (165,100)

​ 28

Table of Contents Exhibit 99.2

OSISKO DEVELOPMENT CORP.

Management’s Discussion and Analysis

For the three and nine months ended September 30, 2023

The following management discussion and analysis (“MD&A”) of the operations and financial position of Osisko Development Corp. and its subsidiaries, (“Osisko Development” or the “Company”) for the three and nine months ended September 30, 2023 (“Q3 2023”) should be read in conjunction with the Company’s unaudited condensed interim consolidated financial statements and related notes for the three and nine months ended September 30, 2023 and with the audited consolidated financial statements for the fiscal year ended December 31, 2022, which h ave been prepared in accordance with International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board (“IASB”). Management is responsible for the preparation of the consolidated financial statements and other financial information relating to the Company included in this report. Unless otherwise noted, all monetary amounts included in this MD&A are expressed in Canadian dollars, the Company’s reporting and functional currency. Assets and liabilities of the subsidiaries that have a functional currency other than the Canadian dollar are translated into Canadian dollars at the exchange rate in effect on the balance sheet date and revenues and expenses are translated at the average exchange rate over the reporting period. This MD&A contains forward-looking statements and should be read in conjunction with the risk factors described in the “ Forward-Looking Statements ” section. This MD&A is dated as of November 8, 2023, the date the Board of Directors approved the Company's unaudited condensed interim consolidated financial statements for the three and nine months ended September 30, 2023 following the recommendation of the Audit and Risk Committee.

The Company was continued as a federal company subject to the provisions of the Canada Business Corporations Act (“CBCA”) in November 2020 and is focused on developing its principal mining assets, including: the Cariboo Gold Project located in British Columbia, Canada (the “Cariboo Gold Project”), the Trixie gold test mine, located in Utah, U.S.A. (“Trixie”), the San Antonio gold project located in Sonora, Mexico (the “San Antonio Gold Project”), and a portfolio of marketable securities. Osisko Development’s common shares are listed on the New York Stock Exchange (“NYSE”) and the TSX Venture Exchange (“TSX-V”) under the symbol ODV.


Table of Contents Table of Contents

1. Our Business 4
2. Financial and Operating Highlights 5
3. Highlights – Q3 2023 5
4. Highlights – Subsequent to Q3 2023 6
5. Management and Board Composition 7
6. Exploration and Evaluation / Mining Development Activities 7
7. Sustainability Activities 19
8. Financial Performance 21
9. Cash Flows 22
10. Financial Position 23
11. Selected Quarterly Information 28
12. Transactions Between Related Parties 29
13. Commitments 29
14. Segmented Disclosure 29
15. Off-balance Sheet Items 30
16. Risks and Uncertainties 30
17. Disclosure Controls, Procedures and Internal Controls over Financial Reporting (ICFR) 38
18. Basis of Presentation of the consolidated Financial Statements 38
19. Critical Accounting Estimates and Judgements 38
20. Financial Instruments 39
21. Technical Information 39
22. Share Capital Structure 39
23. Approval 39

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

Non-IFRS Financial Measures

Osisko Development used in this MD&A, certain non-IFRS (as defined herein) measures including, "all-in sustaining cost" or "AISC" and "cash cost". All-in sustaining cost per gold ounce is defined as production costs less silver sales plus general and administrative, exploration, other expenses and sustaining capital expenditures divided by gold ounces. Cash costs are a non-IFRS measure reported by the Company on an ounces of gold sold basis. Cash costs include mining, processing, refining, general and administration costs and royalties but excludes depreciation, reclamation, income taxes, capital and exploration costs for the life of the mine. Management believes that such measures provide investors with an alternative view to evaluate the performance of the Company. Non-IFRS measures do not have any standardized meaning prescribed under IFRS. Therefore they may not be comparable to similar measures employed by other companies. The data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.

Cautionary Note Regarding Forward-Looking Statements

Except for the statements of historical fact contained herein, the information presented in this MD&A constitutes Forward-Looking Information within the meaning of applicable Canadian Securities Laws concerning the business, operations, plans and financial performance and condition of the Company. Often, but not always, Forward-Looking Information can be identified by words such as “plans”, “expects”, “may”, “should”, “could”, “will”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, “believes”, or variations including negative variations thereof of such words and phrases that refer to certain actions, events or results that may, could, would, might or will occur or be taken or achieved.

Forward-Looking Information involves known and unknown risks, uncertainties and other factors which may cause the actual plans, results, performance or achievements of the Company to differ materially from any future plans, results, performance or achievements expressed or implied by the Forward-Looking Information. Such factors include, among others, the terms for an availability of future financing, actual operating cash flows, operating costs, free cash flows, mineral resources, total cash, transaction costs, and administrative costs of the Company differing materially from those anticipated; project infrastructure requirements and anticipated processing methods, exploration expenditures differing materially from those anticipated; actual results of current exploration activities; variations in mineral resources, mineral production, grades or recovery rates or optimization efforts and sales; delays in obtaining governmental approvals or financing or in the completion of development or construction activities; uninsured risks, including, but not limited to, pollution, cave-ins or hazards for which insurance cannot be obtained; regulatory changes, defects in title; availability or integration of personnel, materials and equipment; inability to recruit or retain management and key personnel; performance of facilities, equipment and processes relative to specifications and expectations; unanticipated environmental impacts on operations; market prices; production, construction and technological risks or capital requirements and operating risks associated with the operations or an expansion of the operations, dilution due to future equity financings, fluctuations in gold, silver and other metal prices and currency exchange rates; uncertainty relating to future production and cash resources; inability to successfully complete new development projects, planned expansions or other projects within the timelines anticipated; adverse changes to market, political and general economic conditions or laws, rules and regulations applicable to the Company; impact of the COVID-19 pandemic; changes in project parameters; the possibility of project cost overruns or unanticipated costs and expenses; accidents, labour disputes, community and stakeholder protests and other risks of the mining industry; failure of plant, equipment or processes to operate as anticipated; risk of an undiscovered defect in title or other adverse claim; factors discussed under the heading “Risk Factors”; and other risks, including those risks set out in the continuous disclosure documents of the Company, which are available on SEDAR+ (www.sedarplus.ca) and on EDGAR (www.sec.gov) under the issuer profiles of the Company.

In addition, Forward-Looking Information herein is based on certain assumptions and involves risks related to the businesses of the resulting issuer. Forward-Looking Information contained herein is based on certain assumptions, including, but are not limited to, interest and exchange rates; the price of gold, copper and other metals; competitive conditions in the mining industry; title to mineral properties; financing and funding requirements; general economic, political and market conditions; and changes in laws, rules and regulations applicable to the Company. 3

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

Although the Company has attempted to identify important factors that could cause plans, actions, events or results to differ materially from those described in Forward-Looking Information in this MD&A, there may be other factors that cause plans, actions, events or results not to be as anticipated, estimated or intended. There is no assurance that such statements will prove to be accurate as actual plans, results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on Forward-Looking Information in this MD&A. All of the Forward-Looking Information in this MD&A are qualified by these cautionary statements.

Certain Forward-Looking Information and other information contained herein concerning the mining industry and the expectations of the Company concerning the mining industry and the Company are based on estimates prepared by the Company using data from publicly available industry sources as well as from market research and industry analysis and on assumptions based on data and knowledge of this industry which the Company believes to be reasonable. However, although generally indicative of relative market positions, market shares and performance characteristics, this data is inherently imprecise. While the Company is not aware of any misstatement regarding any industry data presented herein, the mining industry involves risks and uncertainties that are subject to change based on various factors.

Readers are cautioned not to place undue reliance on Forward-Looking Information. The Company does not undertake any obligation to update any of the Forward-Looking Information in this MD&A, except as required by law.

Cautionary Note to U.S. Investors Regarding the Use of Mineral Reserve and Mineral Resource Estimates

The Company is subject to the reporting requirements of the applicable Canadian Securities Laws, and as a result reports information regarding mineral properties, mineralization and estimates of mineral reserves and mineral resources in accordance with Canadian reporting requirements, which are governed by National Instrument 43-101. As such, the information contained in this MD&A concerning mineral properties, mineralization and estimates of mineral reserves and mineral resources is not comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements of the U.S. Securities and Exchange Commission.

**1.**OUR BUSINESS

Osisko Development is a Canadian-based exploration and development company focused on quality past-producing properties located in mining friendly jurisdictions with district scale potential. The Company’s objective is to become a North American intermediate producer of precious metals, through curating and advancing a portfolio of development projects and investments with potential for value creation. The principal mining assets wholly owned through subsidiaries of the Company as of September 30, 2023 are as follows:

Cariboo Gold Project (Permitting – British Columbia, Canada), owned and operated by Barkerville Gold Mines Ltd. (“Barkerville”)
Trixie test mine (Test mining and exploration – Utah, United States), within the Company’s wider Tintic Project, owned and operated by Tintic Consolidated Metals LLC (“Tintic”)
--- ---
San Antonio Gold Project (Permit Amendment – Sonora, Mexico), owned and operated by Sapuchi Minera S. R.L de C.V. (“Sapuchi Minera”)
--- ---

As an exploration and development stage company, the Company does not generate sufficient cash flows to advance the evaluation and development of its various projects and properties and has historically relied on equity and debt funding to maintain financial liquidity. Continued adequate financial liquidity is dependent on management’s ability to secure additional financings in the future; however, there can be no assurance that the Company will be able to obtain adequate financings in the future, or at terms favourable to the Company (refer to Liquidity and Capital Resources).

The accompanied consolidated financial statements have been prepared on the basis of accounting principles applicable to a going concern, which contemplates the realization of assets and settlement of liabilities in the normal course of business as they come due. In assessing whether the going concern assumption is appropriate, Management takes into account all available information about the future, which is at least, but not limited to twelve months from the end of the reporting period. The working capital position as at September 30, 2023 will not be sufficient to meet the Company’s obligations, commitments 4

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

and forecasted expenditures up to the period ending September 30, 2024. Management is aware, in making its assessment, of material uncertainties related to events and conditions that may cast a substantial doubt upon the Company’s ability to continue as a going concern and accordingly, the appropriateness of the use of accounting principles applicable to a going concern.

**2.**FINANCIAL AND OPERATING HIGHLIGHTS

Three months ended Nine months ended
September 30, September 30,
2023 2022 2023 2022
(In thousands of dollars) **** $
Revenues 10,421 22,791 24,719 44,821
Operating loss (16,453) (111,888) (53,581) (165,100)
Net loss (7,123) (103,731) (43,778) (127,563)
Basic EPS (0.08) (1.37) (0.53) (2.13)
Cash Flows used in operating activities (4,531) (20,540) (49,616) (114,985)
Statistics
Meters drilled - Exploration 1,270 5,362 6,107 11,420
Gold produced (ounces) 2,504 5,693 9,090 19,092
Gold mined (ounces) 3,823 8,893 9,136 19,203

All values are in US Dollars.

As at, **** September 30, 2023 December 31, 2022 December 31, 2021 December 31, 2020
**** $ $ $ $
Cash and cash equivalent 71,498 105,944 33,407 197,427
Total assets 953,263 968,199 703,124 802,144
Total liabilities 225,071 237,765 118,922 102,578

**3.**HIGHLIGHTS – Q3 2023

Sustainability

No environmental issues were reported during the period.

Operations and financial

Three months ended September 30, 2023 and 2022

In Q3 2023, the Company generated revenues of $10.4 million and incurred an operating loss of $16.5 million compared to $22.8 million and $111.9 million, in Q3 2022, respectively. In Q3 2023, the decrease in revenues compared to Q3 2022 is mainly attributable to the decrease of revenue from Bonanza Ledge II and the Sapuchi stockpile. The decrease in operating loss in the quarter is primarily due to the reduction of activities at Sapuchi in Q3 2023 compared to the prior year quarter and, the Sapuchi asset impairment of $81 million in Q3 2022.
In Q3 2023, the Company incurred a net loss of $7.1 million compared to a net loss of $103.7 million in Q3 2022. The decrease in net loss is primarily due to the reasons noted above.
--- ---
The net cash flows used in operating activities in Q3 2023 amounted to $9.1 million compared to $13.1 million in Q3 2022. The decrease is primarily due to the reduction in the operating activities at Sapuchi.
--- ---
Investments in mining interests and property, plant and equipment for Q3 2023 amounted to $7.8 million compared to $18.4 million in Q3 2022. The decrease is primarily due to a reduction in mining development activities including;
--- ---

5

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

the decrease in exploration spending at Barkerville and the feasibility study for the Cariboo Gold Project was finalized and published in January 2023.
Net cash outflows from financing activities amounted to $1.7 million in Q3 2023 compared to a cash outflow of $0.2 million in Q3 2022.
--- ---

Nine months ended September 30, 2023 and 2022

During the first nine months of 2023, the Company generated revenues of $24.7 million and incurred an operating loss of $53.6 million compared to $44.8 million and $165.1 million in 2022, respectively. The decrease in revenues and operating loss is primarily due to the reduction of activities at the Bonanza Ledge II and Sapuchi projects . The change in operating loss is primarily due to the reduction of activity at Sapuchi in Q3 2023 and the Sapuchi asset impairment of $81 million in Q3 2022.
During the first nine months, the Company incurred a net loss of $43.8 million compared to a net loss of $127.6 million in YTD 2022. The net loss decrease is primarily due to the reasons noted above offset by a higher fair value gain adjustment of the warrant liability recorded in 2022.
--- ---
The net cash flows used in operating activities in 2023 amounted to $33.6 million compared to $39 million in 2022. The decrease is primarily due to the reduction in the operating activities at the Bonanza Ledge II and Sapuchi projects.
--- ---
Investments in mining interests and property, plant and equipment in 2023 amounted to $43.8 million compared to $52.4 million in 2022. The decrease in cash used in investing activities compared to Q3 2022 is primarily due to the acquisition of Tintic on May 27, 2022 and the commencement in July 2022 of the Brandy Lee decline at Tintic.
--- ---
Net cash inflows from financing activities amounted to $48.8 million in 2023 compared to a cash inflow of $247.2 million in YTD 2022. In Q2 2022, to partially finance the acquisition of Tintic, the Company raised and closed $255.5 million in brokered and non-brokered private placement financings (refer to Financings).
--- ---
Cash position of $71.5 million as at September 30, 2023 compared to $105.9 million as at December 31, 2022.
--- ---
Based on current projections, the Company believes that the capital resources available as at September 30, 2023 are insufficient to fund its planned development, exploration and corporate activities for the next 12 months. To execute on its planned activities, the Company will need to seek additional funding and/or make adjustments to the timing thereof or reduce planned expenditures. These factors indicate the existence of a material uncertainty that may impact the Company’s ability to continue as a going concern, and to that end, the Company deemed it prudent to present a Going Concern note in its financial statements (refer to Note 1 in the financial statements). The Company is exploring options to secure additional financing; however, there is no assurance that future financing(s) will be available or be available on favorable terms.
--- ---

Exploration Activities

In Q3 2023, the Company announced underground sampling, infill and exploration diamond drilling and chip sampling results from new development areas as part of its 2023 exploration program at Trixie.

Other

On July 6, 2023, the Company announced that in connection with the terms of the Company’s previously completed acquisition in May 2022 of a 100% ownership interest in the Tintic project, it had satisfied the first of five deferred payments to the sellers. Deferred consideration of US$2,500,000 was satisfied by an amount of US$250,000 ($334,400) paid in cash and an amount of US$2,250,000 ($2,986,425) settled by the issuance of 454,026 common shares on July 6, 2023.

**4.**HIGHLIGHTS – SUBSEQUENT TO Q3 2023

On October 10, 2023, the Company announced that it received an Environmental Assessment ("EA") Certificate for the Company's 100%-owned Cariboo Gold Project. The EA Certificate was granted by the Environmental

6

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

Assessment Office of the Province of British Columbia ("EAO") and is supported by approval decisions from The Honourable George Heyman, Minister of Environment and Climate Change Strategy and The Honourable Josie Osbourne, Minister of Energy, Mines and Low Carbon Innovation. Receipt of the EA Certificate successfully concludes the EA process for the Cariboo Gold Project launched in October 2019, and completed in consultation with and support of the First Nations partners.
On October 11, 2023, the Company announced underground infill and exploration diamond drilling results as part of its 2023 exploration program at Trixie. In early October 2023, the Company also commenced drilling of the Trixie West high-priority copper-gold-molybdenum potential porphyry target from underground at Trixie.
--- ---

.

**5.**MANAGEMENT AND BOARD COMPOSITION

The Board of Directors of Osisko Development includes, as elected at the Company’s annual and special meeting of shareholders on May 11, 2023: Sean Roosen (Chair); Charles E. Page (Lead Director); Michele McCarthy; Duncan Middlemiss; Marina Katusa; David Danziger and Éric Tremblay.

Management of Osisko Development includes Sean Roosen (Chair and Chief Executive Officer); Chris Lodder (President); Luc Lessard (Chief Operating Officer); Alexander Dann (Chief Financial Officer & Vice President Finance); Laurence Farmer (General Counsel, VP Strategic Development and Corporate Secretary); François Vézina (Senior Vice President, Project Development, Technical Services and Environment); Chris Pharness (Vice President, Sustainable Development) and Maggie Layman (Vice President, Exploration).

**6.**EXPLORATION AND EVALUATION / MINING DEVELOPMENT ACTIVITIES

Main projects upcoming milestones

Key Milestones for Projects **** Expected Timing of Completion **** Anticipated Remaining Costs*
Cariboo Gold Project
Environmental Assessment certificate Granted (October 10, 2023) $Nil
Permit Q2 2024 $2.0 million
San Antonio Project
Permitting On hold – awaiting permitting process clarification from the government of Mexico $Nil
Tintic Project
Ramp Development – 1^st^ stage Completed (Q3,2023) $Nil
Underground drilling Trixie Q4 2023 $1.0 million
Regional surface drilling Q1 2024 $4.4 million

*As at September 30, 2023 7

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

**6.1.**Cariboo Gold Project – British Columbia, Canada

The Cariboo Gold Project is an advanced stage gold exploration project 100%-owned by the Company located in the historic Wells-Barkerville mining camp, in the District of Wells, central British Columbia, Canada, that extends for approximately 77 kilometres from northwest to southeast. The Company's total land package consists of 415 mineral titles and covers an area of approximately 155,000 hectares. On November 21, 2019, OGR acquired the Cariboo Gold Project through the acquisition of Barkerville. The project was part of the OGR contributed assets that created the Company on November 25, 2020.

Technical reports and mineral resource estimate

A total of 6,500 meters ("m") were drilled in 2022 on the Cariboo Gold Project as part of the infill and exploration drilling on the Lowhee Zone. Drilling commenced in March 2022 and was completed in July of the same year. A total of 27 holes were drilled at closely spaced 12.5 m intervals within the area proposed for the Cariboo Bulk Sample and nearby high priority areas to improve confidence in the model.

Further details on the drill results can be viewed in the Company’s news release filed on SEDAR+ (www.sedarplus.ca) and on EDGAR (www.sec.gov) dated November 15, 2022.

The Company completed a Feasibility Study ("FS") for the Cariboo Gold Project (the "Cariboo FS") with an effective date of January 12, 2023, which contemplates a staged, lower capital intensity project design with scalable infrastructure to account for the current global inflationary environment. Management believes that this approach to developing the Cariboo Project may mitigate development capital intensity risks while providing an opportunity to maximize margins. The Company anticipates that the potential development of the Cariboo Gold Project may provide a basis for progress towards the establishment of a broader mining district camp, including development of multiple deposits over several trends totalling approximately 80 km of mineralization. A summary of the Cariboo FS results are presented below:

METRIC **** UNIT PHASE 1 **** PHASE 2 **** TOTAL LOM ****
Base Case Assumptions
Gold Price US/oz 1,700
Exchange Rate CAD: 0.77
Discount Rate % 5.0%
Production
Mine Life years 3 9 12
Total Ore Mined tonnes 1,542,471 15,160,983 16,703,454
Average Throughput tpd 1,500 4,900 4,056
Average Gold Head Grade, diluted g/t Au 4.43 3.72 3.78
Total Contained Gold oz 219,488 1,811,665 2,031,152
Average Gold Recovery Rate % 93.6% 91.8% 92.0%
Total Recovered Gold, payable oz 205,419 1,663,436 1,868,856
Average Annual Gold Production oz/year 72,501 193,798 163,695
Unit Operating Costs
Underground Mining /t mined 77.6 51.1 53.6
Processing /t mined 37.1 25.3 26.4
Concentrate Transport /t mined 17.3 3.5 4.8
Water and Waste Management /t mined 18.4 6.1 7.2
General and Administrative /t mined 19.4 9.8 10.7
Total Unit Operating Costs /t mined 169.8 95.8 102.7
Operating Costs
Total Cash Costs^2^ US/oz 1,149 748 792
AISC^2^ US/oz 1,634 886 968
Capital Expenditures^3^
Initial Capital M 137.3 137.3
Expansion Capital M 451.1 451.1
Sustaining Capital M 134.2 332.4 466.6
Total M 271.5 783.5 1,055.0

All values are in US Dollars.

​ 8

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

Notes:

1. Totals may not add up due to rounding.
2. This is a non-IFRS measure. Refer to Non-IFRS Financial Measures.
--- ---
3. Capital Expenditures do not include sunk costs ($2.5M) nor pre-permit expenses ($64.8M).
--- ---

Mineral Resources Estimate

The FS includes an updated Mineral Resources estimate incorporating an additional 35,578 meters of drilling data from Shaft, Valley, and Lowhee completed since May 24, 2022 being the effective date of the technical report titled “Preliminary Economic Assessment for the Cariboo Gold Project, District of Well, British Columbia, Canada”, dated May 24, 2022 for the deposits of Cow Mountain (Cow and Valley Zones), Island Mountain (Shaft and Mosquito Zones), and Barkerville Mountain (Lowhee and KL Zones). This resulted in an increase of 6% of total gold ounces in the Inferred Resources category. Measured and Indicated resources are exclusive of Mineral Reserves. Mineral Resources have an effective date of November 11, 2022.

Table 5: Cariboo Mineral Resources Statement – November 11, 2022

**** Tonnes **** Gold Grade **** Contained Gold **** Silver **** Contained
Classification / Deposit (000's) (g/t) (000's oz) Grade (g/t) Silver (000's oz)
Measured
Bonanza Ledge 47 5.06 8
Indicated ****
Bonanza Ledge 32 4.02 4
BC Vein 1,030 3.12 103
KL 386 3.18 39
Lowhee 1,368 3.18 140 0.23 10
Mosquito 1,288 3.68 152 0.08 3
Shaft 4,781 3.39 523 0.06 9
Valley 2,104 3.14 213 0.09 6
Cow 3,644 3.31 388 0.09 11
Total Indicated **** 14,633 3.32 1,562 0.09 39
Inferred
BC Vein 461 3.55 53
KL 1,918 2.75 169
Lowhee 445 3.34 48 0.10 1
Mosquito 1,290 3.55 147 0.01 0
Shaft 6,468 3.84 800 0.01 1
Valley 2,119 3.30 225 0.02 1
Cow 2,769 3.03 270 0.00 0
Total Measured & Indicated **** 14,682 3.33 1,572 0.09 39
Total Inferred **** 15,470 3.44 1,712 0.01 3

Notes:

1.Mineral Resources are exclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

2.The Mineral Resource Estimate conforms to the 2014 CIM Definition Standards on Mineral Resources and Reserves and follows the 2019 CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines.

3.A total of 481 vein zones were modelled for the Cow Mountain (Cow and Valley), Island Mountain (Shaft and Mosquito), Barkerville Mountain (BC Vein, KL, and Lowhee) deposits and one gold zone for Bonanza Ledge. A minimum true thickness of

2.0 m was applied, using the Au gold grade of the adjacent material when assayed or a value of zero when not assayed. 9

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

Graphic

4.The estimate is reported for a potential underground scenario at a cut-off grade of 2.0 g/t Au, except for Bonanza Ledge at a cut- off grade of 3.5 g/t Au. The cut-off grade for the Cow, Valley, Shaft, Mosquito, BC Vein, KL, and Lowhee deposits was calculated using a gold price of US$1,700/oz; a USD:CAD exchange rate of 1.27; a global mining cost of $54.32/t; a processing and transport cost of $22.29/t;a G&A plus Environmental cost of $15.31/t; and a sustaining CAPEX cost of $31.19/t. The cut-off grade for the Bonanza Ledge deposit was calculated using a gold price of US$1,700/oz; a USD:CAD exchange rate of 1.27; a global mining cost of $79.13/t; a processing and transport cost of $65.00/t; and a G&A plus Environmental cost of $51.65/t. The cut-off grades should be re-evaluated in light of future prevailing market conditions (metal prices, exchange rate, mining cost, etc.).

5.Bulk density varies from 2.69 g/cm^3^ to 3.20 g/cm^3^.

6.A four-step capping procedure was applied to composited data. Restricted search ellipsoids ranged from 7 to 50 g/t Au at four different distances ranging from 25 m to 250 m. High-grades at Bonanza Ledge were capped at 70 g/t Au on 2.0 m composited data.

7.The gold Mineral Resources for the Cow, Valley, Shaft, Mosquito, BC Vein, KL, and Lowhee vein zones were estimated using Datamine Studio^TM^ RM 1.9 software using hard boundaries on composited assays. The silver Mineral Resources and the dilution halo gold mineralization were estimated using Datamine Studio^TM^ RM Pro 1.11. The OK method was used. Mineral Resources for Bonanza Ledge were estimated using GEOVIA GEMS^TM^ 6.7 software using hard boundaries on composited assays. The OK method was used to interpolate a block model.

8. Results are presented in situ. Calculations used metric units (meters, tonnes, g/t). Any discrepancies in the totals are due to rounding effects

Mineral Reserves Estimate

Probable Mineral Reserves of 16.7 Mt grading 3.78 g/t Au for 2.03 Moz of contained gold in underground deposits, as defined below, have an effective date of December 6, 2022 and form the basis of the Cariboo FS. Only Mineral Resources that were classified as Measured and Indicated were given economic attributes in the mine design and when demonstrating economic viability were classified as Mineral Reserves, incorporating an external mining dilution factor of 8% into the Mineral Reserves estimate.

Table 6: Cariboo Mineral Reserves Statement – December 6, 2022

**** Tonnes **** Gold Grade **** Contained Gold **** Silver Grade **** Contained
Classification / Deposit (000's) (g/t) (000's oz) (g/t) Silver (oz)
Proven
Probable
Cow 4,127 3.41 453 0.08 11,018
Valley 3,445 3.70 410 0.14 15,059
Shaft 7,962 3.87 990 0.02 4,473
Mosquito 603 4.93 95 0.03 619
Lowhee 567 4.56 83 0.21 3,786
Total Proven and Probable Reserves **** 16,704 **** 3.78 **** 2,031 **** 0.07 **** 34,955

Notes:

1. Totals may not add up due to rounding.
2. Mineral Reserves have been estimated in accordance with CIM Definition Standards for Mineral Resources and Mineral Reserves (2014), which are incorporated by reference in NI 43-101.
--- ---
3. Mineral Reserves used the following assumptions: US$1,700/oz gold price, USD:CAD exchange rate of 1.27, and variable cut- off value from 1.70 g/t to 4.00 g/t Au
--- ---
4. Mineral Reserves include both internal and external dilution along with mining recovery. The external dilution is estimated to be 8%. The average mining recovery factor was set at 93.6% to account for ore left in each block in the margins of the deposit.
--- ---

10

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

For further information regarding the Cariboo Gold Project and the Cariboo FS, including the assumptions, qualifications and limitations relating to disclosure about the Cariboo FS on the Cariboo Gold Project, please refer to the technical report titled “Feasibility Study for the Cariboo Gold Project, District of Well, British Columbia, Canada”, dated January 10, 2023 (amended January 12, 2023) with an effective date of December 30, 2022 (the “Cariboo FS”) on the Company's website or on SEDAR+ (www.sedarplus.ca) and on EDGAR (www.sec.gov) under the Company's issuer profile. The Cariboo FS supersedes the technical report entitled "NI 43-101 Technical Report – Preliminary Economic Assessment for the Cariboo Gold Project" and dated June 22, 2022 (with an effective date of May 24, 2022) (the "Cariboo PEA") as the current technical report in respect of the Cariboo Gold Project for purposes of NI 43-101.

The mineral resource estimate is built upon over 650,000 meters of core from the 2015 to 2021 drill campaigns, and historically verified drill data using a total of 3,550 drill holes. A strong understanding of the controls of mineralization enabled Osisko Development's technical team to construct a mineral resource estimate constrained by lithology, alteration, structure and mineralization.

On May 24, 2022, the Company announced an updated mineral resource estimate for the Cariboo Gold Project as part of its Preliminary Economic Assessment (“PEA”). Resource grades have some built-in dilution integrated through the process of modelling of “vein corridors” as opposed to individual veins. Metallurgical testing has shown that the mineralization can be effectively upgraded by flotation and x-ray transmission ore-sorting, owing to the strong association of gold with pyrite. The concentrates can then be processed at the wholly owned QR mill. The mineral resource estimate incorporates eight deposit areas; the Shaft and Mosquito Creek deposits on Island Mountain, Cow and Valley deposits on Cow Mountain, and Lowhee, KL, BC Vein and Bonanza Ledge deposits on Barkerville Mountain at a cut-off grade of 2.0 g/t Au (grams per metric tonne) for all deposits but Bonanza Ledge. The cut-off grade for Bonanza Ledge is 3.5 g/t Au.

For further information regarding the PEA, please see the technical report titled “Preliminary Economic Assessment for the Cariboo Gold Project, District of Wells, British Columbia, Canada”, dated May 24, 2022 with an effective date of May 24, 2022 (the “Cariboo PEA”) on the Company's website or under the Company's issuer profile on SEDAR+ (www.sedarplus.ca) and on EDGAR (www.sec.gov). Please note that the Cariboo FS supersedes the Cariboo PEA as the current technical report in respect of the Cariboo Gold Project for purposes of NI 43-101.

On December 31, 2022, the Cariboo gold project was written down to its net estimated recoverable amount of $435.7 million which was determined by the value-in-use using a discounted cash-flow approach and reflected as an impairment of Mining Interests. The main valuation inputs used were the cash flows expected to be generated by the production and sale of gold from the Cariboo gold project over the estimated life of the mine, based on the expected long-term gold price per ounce costs inflation forecast and the after-tax real discount rate of 8.1% applied to the cash flow projections.

Permitting and EA Process

Osisko Development started the EA Process in the spring of 2019 for the Cariboo Gold Project.

On October 27, 2021, the Province of British Columbia, Lhtako Dené First Nation and the Company announced the approval of amendments to Mines Act Permits M-238 and M-198 allowing for the expansion of the existing Bonanza Ledge II underground mine. At the time, these amendments supported the employment of additional workers at the mine. The expansion of the Bonanza Ledge II Project allowed for continuity of certain mining activities while the Cariboo Gold Project environmental assessment was underway. In July 2021, the province of British Columbia authorized a permit to extract a bulk sample of 10,000 tonnes of mineralized material, the development of a portal and 2,200 m of drift to access the mineral deposit.

On October 10, 2023, the Company announced that the EAO had granted the EA Certificate for the Cariboo Gold Project. The Company is in process to finalize next steps to apply for the mining permit for the Cariboo Gold Project. 11

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

Cariboo Gold Project – Permitting Timeline Summary

Graphic

As of September 30, 2023, the Cariboo Gold Project is in advanced stages of permitting and the history of the process is summarized in the following highlights:

Signing Ceremony on October 23, 2022 with Lhtako Dené First Nation's Elders and Members in Wells and Quesnel was an important event for the life of project agreement between Lhtako Dene First Nation and Osisko Development highlighting the importance of our partnership and mutual support and benefits.
The Revised Application for the EA Process was submitted to the EAO of British Columbia on October 14, 2022 for the Cariboo Gold Project. The 1,700 comments received by the different reviewers were successfully addressed.
--- ---
In parallel to the EA process, the Company initiated an official application for the permitting of the Cariboo Gold Project with the submission of the Project Description to the Ministry on September 30, 2022. Received the IRT in November 2022.
--- ---
All drilling and geologic modeling work has been completed.
--- ---
All permits were received for the bulk sample in the Lowhee deposit area, which includes 2,200 metres of underground development and the removal 10,000 tonnes of mineralized material for further sorter testing.
--- ---
Outside of the Cariboo Gold Project area there are 25 high quality drill-ready targets demonstrating the years of ongoing exploration in the mineral rights held by ODV around the Cariboo Gold Project.
--- ---

The Company anticipates receiving the permits to allow the construction of the Cariboo Gold Project in Q2 2024.

2023 Objectives

Completion and granting of the EA Certificate.
Continue permitting activities of the Cariboo Gold Project at 4,900 tonnes per day with the inclusion of the Lowhee Zone.
--- ---
Finalize detailed engineering on reclamation work, water treatment and waste management for the start-up of the Cariboo Gold Project.
--- ---
Continue stakeholder engagement and finalize agreement with Xatśūll First Nation and District of Wells.
--- ---
Evaluate to proceed to detailed engineering and permitting of the transmission line for connection with the BC Hydro grid in Q4 2024.
--- ---

​ 12

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

**6.2.**Bonanza Ledge II Project – British Columbia, Canada

The Bonanza Ledge II project is a small scale and short life project that was put into care and maintenance in early June 2022. The project allows the Company to facilitate (i) opportunities for managing historical reclamation obligations inherited by the Company, (ii) hands on training and commissioning of the Company’s mining and processing complex for the Cariboo Gold Project and (iii) the maintenance of the economic and social benefits for the First Nations partners and communities. While working through the environmental assessment review, permitting process and the NI 43-101 technical report for its Cariboo Gold Project, the Company produced approximately 11,424 gold ounces at its Bonanza Ledge II project.

The Company started mining operations at its Bonanza Ledge II project in the first quarter of 2021 as it was granted in Q1 2021, a notice of departure from the Ministry of Energy, Mines and Low Carbon Innovation of British Columbia. The Company announced on October 27, 2021 receipt of the final amendments for the Bonanza Ledge II mine and QR mill permits. The underground portal was completed in Q4 2021.

Please see the caution section "Risk Factors: Operations Not Supported by a Feasibility Study".

2023 Objectives

Improve Water Treatment Plant (“WTP”) at Bonanza Ledge II to treat nitrate species and QR Mill to remove and manage WTP retentate.

**6.3.**Tintic Project – Utah, U.S.A.

The Tintic Project is located in western Utah County, approximately 64 km south of Provo, Utah and 95 km south of Salt Lake City. The property on which the Trixie test mine or Trixie deposit is located encompasses most of the East Tintic District, surrounding and immediately east of the incorporated town of Eureka. The area of the Tintic Project owned or controlled by ODV comprises 1,105 claims totalling 5,746 ha (14,200 acres) of patented mining claims and a further 107 mining claims of approximately 1,214 ha (3,000 acres), which are overwhelmingly leased patented mining claims. ODV owns a small and varying percentage, interest or royalty in a number of other claims outside the main claim package.

Acquisition of Tintic

On May 27, 2022, Osisko Development acquired 100% of Tintic through the purchase of: (i) IG Tintic’s direct 75% ownership in Tintic; and (ii) all issued and outstanding stock of Chief Consolidated Mining Company (“Chief”). Immediately following the closing of the transaction, Chief completed a merger with a newly formed subsidiary of the Company (the “Merger”), such that, following completion of the Merger, Chief is now owned by the Company. The total consideration to the vendors in the aggregate amount of approximately $199.4 million, comprised of: (i) cash payments of approximately $74.7 million, (ii) the issuance of 12,049,449 common shares of the Company and, (iii) Deferred consideration and contingent payments fair valued at $15.1 million.

The deferred payments consist of an amount of US$12.5 million payable in equal instalments annually over five years in cash or shares at the Company’s election; (ii) two 1% NSR royalty grants, each with a 50% buyback right in favour of the Company for US$7.5 million which is exercisable within 5 years; (iii) a right to receive the financial equivalent of 10% of the net smelter returns from stockpiled mineralized material extracted from the Trixie project since January 1, 2018 and sitting on surface; and (iv) US$10 million contingent upon commencement of production at the Burgin Mine.

A number of Tintic shareholders had entered into 12-month lock-up agreements which expired on May 27, 2023.

​ 13

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

With the completion of the transaction, the Company acquired 100% ownership of the producing Trixie test mine, as well as mineral claims covering more than 17,000 acres in Central Utah’s historic Tintic Mining District. Tintic’s ongoing exploration work has demonstrated potential for expansion and further discovery both at the Trixie test mine and the broader land package. It is hoped that the acquisition of Tintic will, as a result of exploration efforts, serve to accelerate the Company’s path towards becoming a mid-tier gold producer and adds further opportunity to explore and develop another project in its portfolio.

Exploration Program

The Tintic Project consists of 23 past producing precious and base metal mines located in the East Tintic Mining District, Utah, 95 km southwest of Salt Lake City. The Tintic Project is comprised of more than 17,000 acres (6,880 ha), including 14,200 acres (5,746 ha) of patented mining claims.

In 2022, the Company completed 28 surface reverse circulation ("RC") drill holes near Trixie totalling approximately 8,753 m and 66 underground diamond drill (“DD”) holes in the 625 level at Trixie totalling approximately 2,985 m using two surface RC rigs and two underground diamond drill rigs. Assays have now been received for all holes. Continuous underground face samples were collected along all development at Trixie, and together with drill results, will be used to estimate the initial mineral resource estimate at Trixie.

In Q3 2023, assay results were received for 14 DD holes from the 2023 exploration program. For additional information please refer to the Company's news release dated July 18, 2023.

An updated Technical Report for the Tintic project was completed in January 2023. The Technical Report, titled "NI 43-101 Technical Report, Initial Mineral Resource Estimate for the Trixie Deposit, Tintic Project, Utah, United States of America" and dated January 27, 2023 (with an effective date of January 10, 2023) (the "Trixie MRE"), was prepared, and compiled for the Company by independent representatives of Micon International Limited in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101"). Listed below is a summary of the initial mineral resource estimate as described in the Trixie MRE:

**** **** **** Contained **** **** Contained
Tonnes Au Grade Gold Ag Grade Silver
Classification (000's) (g/t) (000's oz) (g/t) (000's oz)
Measured 11 190.61 67 195.53 69
Indicated 225 20.17 146 43.73 316
Measured and Indicated **** 236 **** 28.08 **** 213 **** 50.77 **** 385
Inferred **** 385 **** 19.64 **** 243 **** 42.82 **** 530

Notes

1. Troy ounces ("oz"), gold ("Au"), silver ("Ag"), tonnes ("t"), grams per tonne ("g/t").
2. Effective date of the Trixie MRE is January 10, 2023.
--- ---
3. Each of William Lewis P.Geo, of Micon International Limited and Alan S J San Martin, AusIMM(CP), of Micon International Limited (i) has reviewed and validated the Trixie MRE, (ii) is considered to be independent of the Company for purposes of Section 1.5 of NI 43-101, and (iii) is a "qualified person" for purposes of NI 43-101.
--- ---
4. The Trixie MRE is comprised of five zones within the greater Trixie area: T1, T2, T3, T4 and 75-85. No blocks in the T3 meet the cut-off grade used for the Trixie MRE.
--- ---
5. The Trixie MRE disclosed in this news release were estimated using the CIM standards on mineral resources and reserves definitions, and guidelines prepared by the CIM standing committee on reserve definitions and adopted by the CIM council.
--- ---
6. Mineral Resources are reported when they are within potentially mineable shapes derived from a stope optimizer algorithm, assuming an underground longhole stoping mining method with stopes of 6.1 m x 6.1 m x minimum 1.5 m dimensions.
--- ---
7. Mineral resources are not mineral reserves and do not have demonstrated economic viability.
--- ---
8. Geologic modelling was completed by Osisko Development senior production geologist Courtney Kurtz, P.G. of Utah, USA using Leapfrog Geo software. The Trixie MRE was completed by Osisko Development Chief Resource Geologist,
--- ---

14

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

Daniel Downton, P.Geo. using Datamine Studio RM Pro 1.12 software under the supervision of William Lewis and Alan San Martin of Micon International Ltd.
9. The estimate is reported for an underground mining scenario and with USD assumptions. The cut-off grade of 4.85 g/t Au was calculated using a gold price of US$1,750 per ounce, a CAD:USD exchange rate of 1.30; total mining, processing and G&A costs of US$226.62 per imperial ton a combined royalty of 4.5% and an average metallurgical recovery of 95%.
--- ---
10. Average bulk density values in the mineralized domains were assigned to the T1 (2.616 T/m^3^), T2 (2.955 T/m^3^), T3 (2.638 T/m^3^), T4 (2.621 T/m^3^), and 75-85 (2.617 T/m^3^) domains.
--- ---
11. Inverse Distance Squared interpolation method was used with a parent block size of 1.2 m x 1.2 m x 1.8 m.
--- ---
12. The results of the Trixie MRE are presented in-situ. Calculations used metric units (metres, tonnes, g/t). The number of tonnes is rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects.
--- ---
13. Neither the Company nor Micon International Limited is aware of any known environmental, permitting, legal, title-related, taxation, socio-political, marketing or other relevant issue that could materially affect the mineral resource estimate other than disclosed in this news release
--- ---

2023 Objectives

In Q3 2023, the Company continued underground exploration and delineation on the Trixie deposit with two diamond drill rigs. An initial 5,000 meters of underground infill and exploration drilling was proposed for 2023 at Trixie, with additional drilling recommended subject to results and program progress. For the first nine months of 2023, a total of 6,194 meters were drilled in 73 holes and an additional 1 geotechnical hole totalling 349 meters. An initial 3,000 m of surface diamond drilling is proposed to test for copper molybdenum-gold porphyry mineralization on the Tintic Project, property, namely in the Big Hill area. This drilling is scheduled to commence once the surface drill permits are granted. The Company is currently working on an updated Mineral Resources Estimate for the Trixie deposit to incorporate the remaining 2022 drilling that was not included in the initial Trixie MRE due to assay lab delays and the new 2023 drilling results. This new MRE is expected to be completed once all assay results have been received and surface and underground mapping data has been integrated.

Data compilation from historic mines in the area is ongoing and anticipated to generate additional drill targets on the greater Tintic Project property.

The development of an underground ramp, which commenced in July 2022, was completed to the 625 level during Q3 2023 with the breakthrough occurring at the end of September. The Company anticipates that the decline ramp will improve underground access for exploration, and may potentially support an increase in productivity and mining rates in the future.

The ability to achieve any increase in production and the capital required to increase production are the subject of pending technical work. There can be no assurance that technical work will provide justification for further development, support the ability to increase production or demonstrate the ability to increase production through a low-capital expenditure expansion of the existing facilities. The ability to continue and expand operations is subject to risks which include the possible need for additional or amended permits, licences and approvals, risks related to mining operations, the need for additional capital and/or operating expenditures, commodity prices justifying such work, potential scarcity of employees, environmental risks and approvals and the limited knowledge of the mineralized material available on site. The ability to continue production on the current basis is discussed below. Any expansion is, until and unless supported by the proposed technical work, subject to the same risks as set out below regarding operations that are not supported by technical work.

The Company cautions that its prior decision to commence small-scale underground mining activities and batch vat leaching at the Trixie test mine was made without the benefit of a feasibility study, or reported mineral resources or mineral reserves, demonstrating economic and technical viability, and, as a result there may be increased uncertainty of achieving any particular level of recovery of material or the cost of such recovery. The Company cautions that historically, such projects have a much higher risk of economic and technical failure. Small scale test-mining at Trixie was suspended in December 2022 and resumed in the second quarter of 2023. Even with the resumption of small-scale test-mining at Trixie, there is no guarantee that production will continue as anticipated or at all or that anticipated production costs will be achieved. The failure to continue production may have a material adverse impact on the Company’s ability to generate revenue and cash flow to fund operations. Failure to achieve the anticipated production costs may have a material adverse impact on the 15

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

Company's cash flow and potential profitability. The Company cautions that historically, such projects have a much higher economic or technical risks. In continuing current operations at Trixie, the Company has not based its decision to continue such operations on a feasibility study, or reported mineral resources or mineral reserves demonstrating economic and technical viability.

Please see the caution section "Risk Factors: Operations Not Supported by a Feasibility Study".

**6.4.**San Antonio Gold Project – Sonora State, Mexico

The San Antonio Gold Project is a past-producing oxide copper mine. In 2020, following acquisition of this project, the Company concentrated its efforts in obtaining the required permits and amendments to the permits to perform its activities. The Company has filed preventive reports for the processing of the gold stockpile on site and for a drilling program for the Sapuchi, Golfo de Oro and California zones.

The Company also initiated the following activities:

Commencement of the Environmental Impact Manifest (or Manifestacion de Impacto Ambiental (MIA”)) ;
A baseline study;
--- ---
Awarding the Engineering, Procurement, Construction, Management contract for the process of the stockpile
--- ---

On April 29, 2023, Mexico’s Senate approved a wide-ranging reform of laws governing the mining industry, including a requirement that companies pay a percentage of profits to various stakeholders. The new mining law reduces the maximum length of concessions from 50 to 30 years, and may allow authorities to cancel concessions if no work is done on them within two years. The Company is closely monitoring the situation and will continue to assess the potential impacts on its Mexican assets.

Since Osisko Development’s acquisition of the San Antonio Project in November 2020, the Company has successfully achieved the following operational milestones:

The construction of a leach pad and carbon in column plant at the end of 2021 to process stockpiled mineralized material.
1.1 million tonne stockpile with an average grade of 0.58 g/t Au was placed on the heap leach pad.
--- ---
13,591 net ounces of gold sold from the San Antonio heap leach pad as at September 30, 2023
--- ---

Permitting

The Company continued the various permitting activities starting in 2020. These activities consist of obtaining the permits for the MIA and the change of use of land while continuing the work required to complete the environmental baseline study. Applications were submitted for four new mining claims, Sapuchi E-82/40881, Sapuchi 2 E-82/40882, Sapuchi 3 E-82/40883, and Sapuchi 4 E-82/40888.

All documentation required for the change of use land and EA permits were filed and the Company was awaiting the granting of these two permits by the Mexican government. In early December 2022, the director of SEMARNAT announced a moratorium on all environmental permits for open pit operations, which will be denied with no approval process in place until further notice. Subsequently, the Company received communication that the MIA would not be approved. The approval process for environmental permits for mining may resume after the conclusion of the governor and presidential elections which will be held in July 2024, with the new president taking office in September 2024. In order to ensure that the San 16

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

Antonio Gold Project would not be further delayed from the granting of the permits, management withdrew both permit applications with the intent to refile once the moratorium is lifted or a clear approval process is in place.

Exploration Program

A two-phase 45,000-meter drilling campaign was initiated during 2021. The objective of the drill program was to conduct exploration and resource drilling at a spacing of 25 meters and historic drilling validation for the three main target areas; Sapuchi, California and Golfo de Oro. The Company anticipates exploration potential to expand both oxide and sulphide resources.

On June 30, 2022, the Company announced an initial open pit mineral resource estimate for the San Antonio Project (“MRE Sapuchi”). See tables below. The 2022 MRE Sapuchi covers a portion of the Sapuchi – Cero Verde trend that encompasses five deposits: Sapuchi, Golfo de Oro, California, Calvario and High Life over approximately 2.8 km along strike, a maximum width of 600 metres (m) to a maximum depth of 300 m below surface.

The MRE Sapuchi is based on 84,454 m of current and verified historic drilling in 579 holes, of which 27,870 m of drilling in 177 holes were performed by the Company in 2021. Gold mineralization is hosted within altered hydrothermal breccia and sediments, as stockwork quartz veins and veinlets, adjacent to intrusions and fault structures and often associated with iron carbonate minerals. Metallurgical testing has shown amenability of leaching in the oxide materials and recommendations of milling in the transition and sulphide zones. The Company filed the Technical Report on July 22, 2022.

No drilling occurred on the project in 2022 and none planned for 2023.

Indicated Resources
Au Ag
Weathering Tonnes Au Ag Ounces Ounces
Deposit **** Zone **** (Mt) **** (g/t) **** (g/t) **** (000) **** (000,000)
California Oxide 0.6 0.93 2.8 17 0.05
Transition 0.2 0.79 3.3 6 0.02
Sulphide 3.1 1.31 2.4 130 0.23
Total 3.9 1.22 2.5 153 0.30
Golfo de Oro Oxide 0.2 1.07 2.8 7 0.02
Transition 0.1 1.19 2.8 6 0.01
Sulphide 5.3 1.46 2.5 249 0.42
Total 5.6 1.44 2.5 262 0.45
Sapuchi Oxide 1.9 0.85 3.6 53 0.22
Transition 1.4 1.04 3.6 47 0.16
Sulphide 2.1 0.94 3.4 62 0.22
Total 5.4 0.93 3.5 162 0.60
Total **** Oxide **** 2.7 **** 0.89 **** 3.4 **** 77 **** 0.29
**** Transition **** 1.7 **** 1.02 **** 3.5 **** 59 0.19
**** Sulphide **** 10.5 **** 1.31 **** 2.6 **** 441 0.87
**** Total **** 15.0 **** 1.20 **** 2.9 **** 577 1.38

17

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

INFERRED
Au Ag
Weathering Tonnes Au Ag Ounces Ounces
Deposit Zone (Mt) (g/t) (g/t) (000) (000,000)
California Oxide 0.4 0.68 2.1 8 0.02
Transition 0.1 0.85 2.6 4 0.01
Sulphide 1.1 1.27 3.8 46 0.14
Total 1.6 1.10 3.3 58 0.17
Golfo de Oro Oxide 0.5 0.80 3.0 12 0.04
Transition 0.2 0.93 3.4 5 0.02
Sulphide 5.7 1.29 2.5 237 0.46
Total 6.4 1.24 2.5 254 0.52
High Life Oxide 0.5 0.84 4.2 14 0.07
Transition 0.2 0.73 4.5 4 0.02
Sulphide 0.1 0.90 8.3 4 0.04
Total 0.8 0.83 4.9 22 0.13
Sapuchi Oxide 3.2 0.74 3.7 75 0.37
Transition 1.6 0.92 3.6 48 0.19
Sulphide 2.8 0.92 4.1 84 0.37
Total 7.6 0.85 3.8 207 0.93
Calvario Oxide 0.1 0.53 0.0 2 0.00
Transition 0.0 0.55 0.0 0.0 0.00
Sulphide 0.0 0.0 0.0 0.0 0.00
Total 0.1 0.53 0.0 2.0 0.00
Total **** Oxide **** 4.7 **** 0.74 **** 3.5 **** 111 **** 0.50
**** Transition **** 2.1 **** 0.90 **** 3.6 **** 61 0.24
**** Sulphide **** 9.7 **** 1.18 **** 3.2 **** 371 1.01
**** Total **** 16.5 **** 1.02 **** 3.3 **** 543 1.75

MRE Sapuchi Notes:

Rodrigo Calles-Montijo, of Servicios Geológicos IMEx, S.C., William J. Lewis and Alan J San Martin, of Micon International Limited have reviewed and validated the mineral resource estimate for Sapuchi, Golfo de Oro, California, High Life and Calvario deposits. All are independent “Qualified Persons” (as defined in NI 43-101) responsible for the 2022 MRE Sapuchi. The effective date of the MRE Sapuchi is June 24th, 2022.
Specific extraction methods are used only to establish reasonable cut-off grades for various portions of the deposit. No Preliminary Economic Analysis, Pre-Feasibility Study or Feasibility Study has been completed to support economic viability and technical feasibility of exploiting any portion of the mineral resource, by any particular mining method.
--- ---
The mineral resources disclosed were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) standards on mineral resources and reserves definitions, and guidelines prepared by the CIM standing committee on reserve definitions and adopted by the CIM council.
--- ---
The calculated economic cut-off grade for the resource in: Oxides (70% recovery) is 0.27 g/t Au, transition and sulphides (90% recovery) is 0.44 g/t Au
--- ---
Mineral resources are not mineral reserves and do not have demonstrated economic viability.
--- ---
Geologic modeling was completed by Osisko Development. The MRE Sapuchi was completed by Geologist Leonardo Souza, MAusIMM (CP) of Talisker Exploration Services, under the supervision of Rodrigo Calles-Montijo, of Servicios Geológicos IMEx, S.C., William  J.Lewis and Alan J. San Martin, of Micon International Limited
--- ---
The estimate is reported for a potential open pit scenario and with USD assumptions. The cut-off grades were calculated using a gold price of $1,750 per ounce, a CAD:USD exchange rate of 1.3; mining cost of $2.95/t; processing cost of $4/t for oxides and $13.0/t for transition and sulphides; and general and administration costs of
--- ---

18

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

$2.50/t. The cut-off grades should be re-evaluated in light of future prevailing market conditions (metal prices, exchange rate, mining cost, etc.).
A density of 2.55 g/cm3 was established for all oxide zones, 2.69 g/cm3 for transition zones and 2.74g/cm3 for the sulphide zones.
--- ---
Resources for Sapuchi, Golfo de Oro, California, High Life and Calvario were estimated using Datamine Studio RM 1.3 software using hard boundaries on composited assays (3.0 m for all zones). Ordinary Kriging interpolation method was used in a with a parent block size = 10m x 10m x 5m.
--- ---
Results are presented in-situ. Ounce (troy) = metric tons x grade / 31.10348. Calculations used metric units (metres, tonnes, g/t). The number of metric tons was rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects; rounding followed the recommendations as per NI 43-101.
--- ---

Neither the Company, Servicios Geológicos IMEx, S.C., nor Micon International Limited. is aware of any known environmental, permitting, legal, title-related, taxation, socio-political, marketing or other relevant issue that could materially affect the mineral resource estimate other than disclosed in the MRE Sapuchi technical report.

For further information regarding the San Antonio Project, please see the technical report titled “NI 43-101 Technical Report for the 2022 Mineral Resource Estimate on the San Antonio Project, Sonora, Mexico”, dated July 12, 2022 with an effective date of June 24, 2022 on the Company's website or under the Company's issuer profile at www.sedarplus.ca  and at www.sec.gov.

Stockpile

In the first quarter of 2022, Sapuchi Minera commenced processing its stockpile inventory through sodium cyanide heap leach pads (“heap leach pad”) and carbon-in-column processing plant. The Company realized its first gold sales in July 2022 and generated gold sales totalling 10,478 net ounces in 2022. During the quarter ended September 30, 2023, Sapuchi Minera sold 803 net ounces of gold and 3,113 net ounces of gold sold in the first nine months of 2023. During the quarter, processing of the remaining stockpile inventory was completed, and the Company does not anticipate any material production henceforth.

On September 30, 2022, the San Antonio gold project was written down to its net estimated recoverable amount of $35.0 million ($nil net of the stream financing), which was determined by the value-in-use using a discounted cash-flows approach. The main valuation inputs used were the cash flows expected to be generated by the production and sale of gold from the San Antonio gold project over the estimated life of the mine, based on the expected long-term gold price per ounce costs inflation forecast and the pre-tax real discount rate of 19.9% applied to the cash flow projections.

2023 Objectives

The Company awaits next steps from the government of Mexico with respect to the permitting process.

**7.**SUSTAINABILITY ACTIVITIES

The Company views sustainability as a key part of its strategy to create value for its shareholders and other stakeholders.

The Company focuses on the following key areas:

Promoting the mining industry and its benefits to society;
Promoting the Company’s values through our three pillars of Sustainability; Good neighbor, Engaged workforce and Environmental stewardship;
--- ---
Developing and maintaining strong relationships with First nations, stakeholders, the Federal, Provincial and Municipal governments where the Company has activities and projects;
--- ---
Supporting the economic development of regions where it operates;
--- ---
Promoting diversity and inclusivity throughout the organization and the mining industry; and
--- ---

19

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

Encouraging investee companies and our contractors to adhere to the same areas of focus in sustainability.

The following are a few highlights from each of the projects:

Barkerville

Positive relationship with Lhtako Dené Nation since 2015. Agreements include engagement protocol (signed in 2016), relationship agreements (2016) and life of project agreement (2020);
Positive relationship with Xatsull First Nation and with Williams Lake First Nation (“WLFN”) since 2016 and 2017 respectively;
--- ---
Positive relationship with the District of Wells in British Columbia since 2016 and a Memorandum of Understanding signed in early 2022 to facilitate discussions for a project agreement;
--- ---
Open and transparent dialogue with the Ministry of Energy Mines and Low Carbon Innovation and The Ministry of the Environment and Climate Change Strategy to ensure positive relations;
--- ---
Installation of a water treatment plant to treat contact water and effluent completed;
--- ---
Reclamation work started on the Mosquito Creek old mine site;
--- ---
Signature of Collaboration Agreement for the reclamation of the Jack of Clubs Lake mining legacy site with the Crown Contaminated Site Program of the BG Ministry of Forest.
--- ---
Initiation of the second Sustainable Workforce Initiative for underground miner training to provide skills training to support a local workforce;
--- ---
Funding provided to local organizations within the Wells and Barkerville communities to support various initiatives;
--- ---
The Company in partnership with the Lhtako Dené Nation, initiated and is developing a stewardship society focused on the recovery of southern mountain caribou populations around Wells BC and, the enhancement and recovery activities of Bowron River sockeye and chinook salmon runs; and
--- ---
On July 5, 2022, The Company and WLFN entered into a participation agreement.
--- ---

Tintic

Building positive relationships with the Utah Department of Environmental Quality, Divisions of Air Quality and Water Quality.
Implementation of environmental management plans for water, storm water and waste management for the Trixie test mine.
--- ---
Building positive relationships with many stakeholders and local providers towards the development of the project.
--- ---
Submission of the LOM to the Utah Division of Oil, Gas and Mining, the Small Source Exemption for Air Quality to the Division of Air Quality.
--- ---

Sapuchi Minera

Reached a long-term agreement with Eijdo San Antonio, one of the primary impacted local communities.
An environmental baseline study was completed.
--- ---

​ 20

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

**8.**FINANCIAL PERFORMANCE

Consolidated statements of loss

The following table presents summarized statements of loss for the three and nine months ended September 30, 2023 and 2022 (in thousands of dollars):

**** Three months ended Nine months ended
September 30, September 30,
2023 2022 2023 2022
$ $ $ $
Revenue (a) **** 10,421 **** 22,791 **** 24,719 **** 44,821
Operating expenses **** ****
Cost of sales (a) (10,087) (23,435) (25,900) (44,811)
Other operating costs (b) (6,759) (21,444) (20,788) (57,292)
General and administrative (c) (9,382) (8,710) (29,926) (26,451)
Exploration and evaluation (646) (90) (1,686) (367)
Impairment of assets (81,000) (81,000)
Operating loss **** (16,453) **** (111,888) **** (53,581) (165,100)
Other income, net of other expense (d) 9,788 8,156 9,310 39,026
Loss before income taxes **** (6,665) **** (103,732) **** (44,271) (126,074)
Income tax recovery (expense) (458) 1 493 (1,489)
Net loss (7,123) (103,731) (43,778) (127,563)

a) The Company recognized $24.7 million in revenues from processing QR & BL stockpiles at BGM at a third-party processing facility, VAT leach operations at Trixie and the processing of the stockpile at Sapuchi. Small-batch VAT leaching at Trixie continued during the quarter as the Company advanced ongoing technical work in connection with the required mine and mill infrastructure upgrades. The cost of sales in relation to the gold and silver sold of $25.9 million was also recognized in the consolidated statement of loss for the nine months ended September 30, 2023 in accordance with IAS 2, Inventories are recorded at the lowest of net realizable value or at costs.

b) Other operating costs of $20.8 million were recognized in the nine months ended September 30, 2023. These costs mainly relate to the care and maintenance at Barkerville.

c) General and administrative expenses of $30.0 million, for the nine months ended September 30, 2023, ($26.5 million in YTD Q3 2022) include $11.0 million of salaries, $19.8 million of administrative expenses, $0.8 million of business development and $1.7 million of gain on disposal of assets. The increase compared to Q3 2022 is due to higher legal and consulting fees as well as higher salary expenses.

d) Other income net of other expenses amounts to $9.3 million for the nine months ended September 30, 2023 which includes the recognition of an unrealized gain of $7.0 million on the fair value adjustment of the warrant liability, the foreign exchange gains related to impact of variation in exchange rates offset by the accretion expense. In Q3 2022, the balance of other income net of other expenses was higher due to the recognition of an unrealized gain of $21.9 million on the fair value of the warrant liability.

​ 21

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

**9.**CASH FLOWS

The following table summarizes the cash flows (in thousands of dollars):

**** Three months ended **** Nine months ended
September 30, September 30,
2023 **** 2022 2023 **** 2022
$ $ $ $
Cash flows
Operations (9,446) (276) (35,446) (42,468)
Working capital items 365 13,360 1,797 3,466
Operating activities (9,081) **** 13,084 **** (33,649) **** (39,002)
Investing activities (4,531) **** (20,540) **** (49,616) **** (114,985)
Financing activities (1,704) **** (162) **** 48,768 **** 247,200
Increase (decrease) in cash before effects of exchange rate changes on cash (15,316) (7,618) (34,497) 93,213
Effects of exchange rate on changes on cash (90) 4,454 51 6,518
Increase (decrease) in cash (15,406) **** (3,164) **** (34,446) **** 99,731
Cash – beginning of period 86,904 **** 136,302 **** 105,944 **** 33,407
Cash – end of period 71,498 **** 133,138 **** 71,498 **** 133,138

Operating Activities

In Q3 2023 cash flows used in operating activities amounted to $9.1 million compared to $13.1 million in Q3 2022. Cash flows used in operating activities in YTD 2023 amounted to $33.6 million compared to $39.0 million in 2022.  The decrease in operating activities is mainly due to lower operating expenses at BGM compared to YTD 2022. In YTD 2022, the expenses mainly came from the non-recurrent work done at Goldstream during Q3 2022 and from the care & maintenance costs (Refer to the Results of Operations section above).

Investing Activities

Cash flows used in investing activities amounted to $4.5 million in Q3 2023 compared to cash flows used in investing activities of $20.5 million in Q3 2022. For YTD 2023, the investing activities total $49.6 million compared to $115.0 million in 2022. This decrease is primarily due to the acquisition of Tintic in YTD 2022 as well as a reduction in mining development activities. More precisely, the exploration spending at BGM decreased and the feasibility study for the CGP project was finalized and published in January 2023.

Financing Activities

The cash outflows related to the financing activities amounted to $1.7 million in Q3 2023 compared to cash flows provided by financing activities of $0.2 million in Q3 2022. For YTD 2023, cash flows provided by financing activities amounted to $48.8 million compared to $247.2 million in 2022. In YTD 2022 the amount of financing activities was higher due to the proceeds from equity financings of $255.5 million raised from the Brokered Private Placement.

The total financing activities in YTD 2023 include $51.8 million in proceeds from the completion of a bought deal public offering that was done in Q1 2023 (refer to Financings section).

Since the inception of the Company up to the date of this report, a total of $657.8 million of capital has been raised through brokered, non brokered, stream financings and bought deal public offering.

​ 22

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

**9.1.**Liquidity and Capital Resources

As at September 30, 2023, the company’s working capital was $38.4 million, which included cash of $71.5 million. The Company incurred a loss of $43.8 million for the nine months period ended September 30, 2023. The working capital as at September 30, 2023 will not be sufficient to meet the Company’s obligations, commitments and forecasted expenditures through September 30, 2024. Management is aware, in making its assessment, of material uncertainties related to events and conditions that may cast a substantial doubt upon the Company's ability to continue as a going concern as described in the preceding paragraph, and accordingly, the appropriateness of the use of accounting principles applicable to a going concern. The accompanied condensed consolidated financial statements do not reflect the adjustments to the carrying values of assets and liabilities, expenses and financial position classifications that would be necessary if the going concern assumption was not appropriate. These adjustments could be material. In assessing whether a going concern assumption is appropriate, management considers all available information about the future, which is at least, but not limited to, twelve months from the end of the reporting period. In order to execute on its planned activities, the Company will be required to secure additional financing in the future, which may be completed in several ways including, but not limited to, a combination of selling investments from its existing portfolio, project debt finance, offtake or royalty financing and other capital market alternatives. However, there can be no assurance that the Company will be able to obtain adequate financings in the future, or at terms favorable to the Company.

Significant variations in the liquidity and capital resources for the nine months ended September 30, 2023 are explained below under the Cash Flows section. The Company is dependent upon raising funds in order to fund future capital expenditures and development programs. See the Risk and Uncertainties section of this MD&A for more details.

**10.**FINANCIAL POSITION

**** As at As at ****
(in thousands of dollars) September 30, 2023 December 31, 2022 Variance
$ $ %
Cash 71,498 105,944 (33)%
Amounts receivable 6,417 11,046 (42)%
Inventories 11,467 17,641 (35)%
Other current assets 7,027 6,621 6%
Total Current Assets 96,409 **** 141,252 (32)%
Investment in associates 8,353 8,833 (5)%
Other investments 22,516 33,819 (33)%
Mining Interests 603,205 580,479 4%
Property, plant and equipment 114,931 111,696 3%
Exploration & evaluation 67,988 55,126 23%
Other assets 39,861 36,994 8%
Total Assets 953,263 **** 968,199 (2)%
Total Current Liabilities 58,019 51,042 14%
Long term debt 6,092 12,256 (50)%
Lease liabilities 755 **** 962 (22)%
Contract liability 63,883 54,252 18%
Environmental rehabilitation provision 53,678 66,032 (19)%
Warrant liability 9,322 16,395 (43)%
Deferred consideration and contingent payments 10,578 13,252 (20)%
Deferred income taxes 21,881 23,574 (7)%
Other non-current liabilities 863 100%
Total Liabilities 225,071 **** 237,765 (5)%
Total equity 728,192 **** 730,434 0%
Total liabilities and equity 953,263 **** 968,199 (2)%

23

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

The Company’s cash balance on September 30, 2023 decreased from the amount held on December 31, 2022, as described in section 9 – Cash Flows.

The decrease in inventories is mainly due to the reduction of activities at Sapuchi.

Other investments decreased due to the overall change in fair values and partial dispositions of holdings in the Company’s investment portfolio.

The decrease in long-term debt is mainly due to a reclassification to short term of a debt that is maturing which is included in current liabilities.

Warrant liability decrease is mainly related to a decrease in the ODV share price.

The deferred consideration and contingent payments decreased compared to December 31, 2022. In Q2 2023, US$2,5000,000 was satisfied by an amount of US$250,000 ($334,400) paid in cash in June 2023 and an amount of US$2,250,000 ($2,986,425) settled by the issuance of 454,026 common shares in July 2023 that was reclassified to short term liability as of June 30, 2023.

**10.1.**Investment in associates and other investments

The Company’s assets include a portfolio of shares, mainly of Canadian publicly traded exploration and development mining companies. The Company may, from time to time and without further notice except as required by law or regulations, increase or decrease its investments at its discretion.

Fair value of marketable securities

The following table presents the carrying value and fair value of the remaining investments in marketable securities (excluding warrants and convertible debt) as at December 31, 2022 and September 30, 2023 (in thousands of dollars):

**** September 30, 2023 **** December 31, 2022
Carrying **** Fair Carrying **** Fair
Investments value^(i)^ value^(ii)^ value^(i)^ value^(ii)^
$ $ $ $
Associates 8,353 5,861 8,833 4,923
Other 22,516 22,516 33,819 33,819
30,869 28,377 42,652 38,742

(i) The carrying value corresponds to the amount recorded on the consolidated statement of financial position, which is the equity method for investments in associates and the fair value for the other investments, as per IFRS 9, Financial Instruments.
(ii) The fair value corresponds to the quoted price of the investments on a recognized stock exchange for the respective period.
--- ---

​ 24

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

Main Investments

The following table presents the main investments of the Company in marketable securities as at September 30, 2023:

Number of
Company Shares Held Ownership
%
Falco Resources Limited (associate) 46,885,240 17.3

Falco Resources Limited (“Falco”)

Falco’s main asset is the Horne 5 gold project, for which the summarized results of an updated feasibility study were released on March 24, 2021. In June 2021, Falco entered into an agreement in principle with Glencore Canada Company establishing the framework of the terms and conditions (the “Agreement in Principle”) pursuant to which the parties will enter into the Principal Operating License and Indemnity Agreement (the “OLIA”) in order to enable Falco to develop and operate its Horne 5 project. The Agreement in Principle outlines the terms to be included in the OLIA which will establish the framework to govern Falco’s development and operation of its Horne 5 project.

Falco also entered into an option agreement granting Falco the sole and exclusive right to acquire an undivided one hundred percent ownership interest in the Norbec and Millenbach sites located in the vicinity of the City of Rouyn-Noranda. The properties will serve as the tailings management facilities and are located at a former tailings facility (the old Norbec Mine), which has already been impacted by historical mining activities and is situated approximately 11 kilometres from the Horne 5 project’s mining complex site. The use of this previously impacted site is consistent with Falco’s environmental, social and governance strategies. As at September 30, 2023, the Company holds 46,885,240 common shares representing a 17.3% interest in Falco (17.3% as at December 31, 2022). The Company concluded that it exercises significant influence over Falco and accounts for its investment using the equity method.

**10.2.**Financings

Current year financings

2023 Bought Deal

On March 2, 2023, the Company completed a bought deal public offering of an aggregate of 7,841,850 units of the Company (the "Units") at a price of $6.60 per Unit, for aggregate gross proceeds of approximately $51.8 million (the "Offering"), including the full exercise of the over-allotment option. Each Unit is comprised of one common share of the Company (each, a "Common Share") and one common share purchase warrant (each, a "Warrant") of the Company.

Each Unit is comprised of one common share of the Company (each, a "Common Share") and one common share purchase warrant (each, a "Warrant"), with each Warrant entitling the holder thereof to purchase one additional Common Share at a price of $8.55 per Common Share for a period of 36 months following the date hereof, subject to adjustments. The Offering was co-led by Eight Capital and National Bank Financial Inc., acting as co-lead underwriters and joint bookrunners, and on behalf of a syndicate of underwriters including BMO Nesbitt Burns Inc., RBC Dominion Securities Inc., Canaccord Genuity Corp., Haywood Securities Inc., and PI Financial Corp. (collectively, the "Underwriters"). The Underwriters were paid a cash commission equal to 5% of the gross proceeds of the Offering.

The Company intends to use the net proceeds of the Offering to advance the development of the Company's material mineral projects, being the Tintic Project and the Cariboo Gold Project, and for general corporate purposes. The Company filed a short form prospectus (the "Prospectus") in each of the provinces of Canada pursuant to National Instrument 44-101 – Short Form Prospectus Distributions to qualify for distribution the Units offered pursuant to the Offering. Copies of the Prospectus and documents incorporated by reference therein are available electronically on SEDAR+ (www.sedarplus.ca) under the Company's issuer profile. 25

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

Prior year financings

2022 Brokered private placement

On March 2, 2022, the Company completed a brokered private placement issuing 9,525,850 brokered units at a price of $4.45 for gross proceeds of $42.4 million and 13,732,900 brokered subscription receipts at a price of $4.45 for gross escrowed proceeds of $61.1 million (the “Brokered Subscription Receipts” and together with the Brokered Units, the “Brokered Private Placement”), on a pre-share consolidation basis. Each brokered unit is comprised of one common share and one warrant, with each warrant entitling the holder to purchase one additional common share at a price of $22.80 ($7.60 pre-share consolidation) per common share for a period of 5 years following the closing date of the brokered private placement (“Brokered Unit”).

Each Brokered Subscription Receipt entitles the holder to receive one Brokered Unit, upon the satisfaction of the following escrow release conditions (“Brokered Escrow Release Conditions”);

(a) the completion, satisfaction or waiver of all conditions precedent to the Tintic acquisition in accordance with the Tintic definitive agreements and all regulatory approvals;
(b) the Company and the Underwriters, having delivered a completion notice and direction to the Escrow Agent in accordance with the terms of the Subscription Receipt Agreement confirming that the condition set forth in the condition above has been met; and
--- ---
(c) the conditions are met on or before June 15, 2022.
--- ---

On May 27, 2022, the Company having met the Brokered Escrow Release Conditions and receiving regulatory and TSX-V approvals, the escrowed proceeds of $61.1 million (including accrued interest) were released to the Company.

The total Issuance costs related to the Brokered Units amounted to $3.5 million and have been allocated against the common shares and warrants issued.

The fair value of the warrants issued was evaluated using the residual method and were valued at $1.6 million, net of issuance costs.

2022 Non-Brokered private placements

The Company completed three tranches of non-brokered private placements, issuing subscription receipts at a price of US$3.50 (i) the first tranche closed on March 4, 2022 issuing 24,215,099 subscription receipts for gross proceeds of US$84.8 million ($108.1 million) (ii) the second tranche closed on March 29, 2022 issuing 9,365,689 subscription receipts for gross proceeds of US$32.8 million ($41 million), and (iii) the third tranche closed on April 21, 2022 issuing 512,980 subscription Receipts for gross proceeds of US$1.8 million ($2.2 million), collectively (“Non Brokered Subscription Receipts”). Each Non-Brokered Subscription Receipt entitles the holder to receive one non brokered unit which is comprised of one common share and one common share purchase warrant, with each warrant entitling the holder to purchase one additional common share at a price of US$6.00 per common share for a period of 5 years from the date of issue (“Non Brokered Unit”).

Each Non Brokered Subscription Receipt entitles the holder to receive one Non Brokered Unit, upon the satisfaction of the escrow release condition to list the Company’s common shares on the New York Stock Exchange on or before June 15, 2022 (the “Non-Brokered Escrow Release Condition”).

The Non-Brokered Subscription Receipts will be automatically converted into Units, and the escrowed proceeds and interest earned thereon will be released to the Company, upon meeting the Non Brokered Escrow Release Condition. 26

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

On May 27, 2022, the Company having met the Non Brokered Escrow Release Condition and regulatory including TSX-V approvals, the escrowed gross proceeds of US$119.4 million (including accrued interest) were released to the Company.

Issuance costs incurred amounted to $2.8 million related to the issuance of Non-Brokered Subscription Receipts are recognized as contributed surplus in the statements of financial position.

2022 OBL Stream

The Company entered into a binding term sheet with OBL for a stream on the metals produced from Tintic for total cash consideration of US$20 million. Under the terms of the Stream, the Company will deliver to OBL 2.5% of all metals produced from Tintic at a purchase price of 25% of the relevant spot metal price. Once 27,150 ounces of refined gold have been delivered, the Stream rate will decrease to 2.0% of all metals produced. Closing of the Stream occurred in the third quarter of 2022 and the proceeds from the Stream are being used to advance the development of Tintic.

2020 and 2021 financings

In 2020 and 2021, the Company raised gross proceeds of approximately $253.7 million. The following summarizes each of the financing events on a pre-share consolidation basis:

On March 18, 2021, the Company announced the completion of a bought deal brokered private placement for aggregate gross proceeds of approximately $33.6 million which included partial exercise of the underwriters option and consisting of; (i) 2,055,742 flow-through (“FT”) Share at a price of $9.05 per FT Share and (ii) 1,334,500 Charity FT Share at a price of $11.24 per Charity FT Share. The gross proceeds will be used by the Company to incur eligible Canadian exploration expenses that will qualify as flow-through mining expenditures as such terms are defined in the Income Tax Act (Canada) related to the Cariboo Gold Project and other exploration assets of the Company located in British Columbia.

On February 5, 2021, the Company closed the second and final tranche of the non-brokered private placement for 1,515,731 units for gross proceeds of $11.2 million. Each unit consists of one common share of the Company and one-half of one common share purchase warrant of the Company, which each whole warrant entitling the holder to acquire one common share of the Company at a price of $10.00 per share on or prior to December 1, 2023;

On January 8, 2021, the Company closed the first tranche of a non-brokered private placement of 9,346,464 units for gross proceeds of $68.6 million. Each unit consists of one common share of the Company and one-half of one common share purchase warrant of the Company, with each whole warrant entitling the holder to acquire one common share of the Company at a price of $10.00 per share on or prior to December 1, 2023.

On December 30, 2020, the Company closed a bought deal Private Placement of 5,367,050 units of the Company at a price of $7.50 per units for gross proceeds of $40.2 million. Each unit consists of one common share of the Company and one-half of one common share purchase warrant of the Company, with each whole warrant entitling the holder to acquire one common share of the Company at a price of $10.00 per share on or prior to December 1, 2023. Fees were paid by the Company to the underwriters and other issuance costs were paid by the Company in connection with the December 2020 bought deal Private Placement. The proceeds of the December 2020 bought deal Private Placement are to be used to further develop the Cariboo Gold Project, advance the San Antonio Gold Project towards production and for general corporate purposes.

On October 29, 2020, prior to the closing of the RTO, the Company closed an initial bought deal Private Placement of 13,350,000 units of the Company at a price of $7.50 per Common Share for gross proceeds of $100.1 million. Each unit consists of one common share of the Company and one-half of one common share purchase warrant of the Company, with each whole warrant entitling the holder to acquire one common share of the Company at a price of $10.00 per share on or prior to December 1, 2023. Fees were paid by the Company to the underwriters and other issuance costs were paid by the Company in connection with the October 2020 bought deal Private Placement. The proceeds of the October 2020 bought 27

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

deal Private Placement are to be used to further develop the Cariboo Gold Project, advance the San Antonio Gold Project towards production and for general corporate purposes.

Summary of Use of Proceeds from financings

As at September 30, 2023 (in millions of dollars)

**** Prior/Current **** ****
Description Disclosure^1^ Actual Spent Remaining
March 2, 2023 - Bought deal Units $ 51.8 $ 29.1 $ 22.7
Tintic, Cariboo Gold Project, Corporate G&A & working capital
May 27, 2022 – Brokered Units $ 59.7 $ 51.3 $ 8.4
Corporate G&A & working capital
May 27, 2022 – Non-Brokered Units $ 148.2 $ 107.8 $ 40.4
Tintic acquisition and other
March 2, 2022 – Brokered Units Cariboo Gold and San Antonio projects, G&A & working capital $ 40.3 $ 40.3 Nil
March 18, 2021 Cariboo Gold project, eligible flow-through expenditures $ 33.6 $ 33.6 Nil
February 5, 2021 Cariboo Gold and San Antonio projects and G&A $ 11.2 $ 11.2 Nil
January 8, 2021 Cariboo Gold and San Antonio projects and G&A $ 68.6 $ 68.6 Nil
December 30, 2020 Cariboo Gold and San Antonio projects and G&A $ 40.2 $ 40.2 Nil
October 29, 2020 Cariboo Gold and San Antonio projects and G&A $ 100.1 $ 100.1 Nil

Note:

1. Amounts presented are on a gross basis.

**11.**SELECTED QUARTERLY INFORMATION

Selected financial results for the previous quarters reported, which have been derived from the financial statements prepared in accordance with IFRS are shown in the table below:

**** 2023 **** 2023 **** 2023 **** 2022 **** 2022 **** 2022 **** 2022 **** 2021 **** 2021
In thousands of dollars, except per share amounts Q3 Q2 Q1 Q4 Q3 Q2 Q1 Q4 Q3
Revenues 10,421 10,847 3,451 19,225 22,791 12,863 9,167 2,980 3,906
Net loss (7,123) (13,318) (23,337) (64,897) (103,731) (1,500) (22,332) (56,452) (31,745)
Net loss per share (0.08) (0.16) (0.30) (0.86) (1.37) (0.03) (0.49) (1.27) (0.71)
Net loss diluted per share (0.08) (0.16) (0.30) (0.86) (1.37) (0.03) (0.49) (1.27) (0.71)

The numbers for the average basic and diluted shares outstanding for all the periods presented in the consolidated statements of loss and comprehensive loss have been adjusted to reflect the effect of the 3:1 share consolidation that was put into effect on May 4, 2022.

Significant losses incurred in Q4 2022, were driven by the impairment of assets related to the Company’s Bonanza Ledge Phase II project, Sapuchi stockpile project and exploration and evaluation assets

​ 28

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

**12.**TRANSACTIONS BETWEEN RELATED PARTIES

Please refer to details on the related party transactions in Note 32 of the Company’s consolidated financial statements for the year ended December 31, 2022.

**13.**COMMITMENTS

As of September 30, 2023, the Company had the following minimum contractual obligations and commitments (in thousands of dollars):

**** Total^1^ **** less than 1 year **** 1 2 years **** 3 4 years
Purchase obligations 7,702 7,702
Capital commitments 16,499 8,951 7,548
Total **** 24,201 **** 16,653 **** 7,548 ****

(1) The timing of certain capital payments is estimated based on the forecasted timeline of the projects. The majority of the commitments can be canceled at the discretion of the Company with little or no financial impact.

**14.**SEGMENTED DISCLOSURE

The Company operates under a single operating segment, being the acquisition, exploration and development of mineral properties.

The assets related to the exploration, evaluation and development of mining projects are located in Canada (Barkerville) in Mexico (Sapuchi) and in USA (Tintic), and are detailed as follow as at September 30, 2023 (in thousands of dollars):

Non-Current Assets

September 30, 2023
Canada Mexico USA Total
$ $ $ $
Other assets (non-current) 15,711 20,430 3,720 39,861
Mining interest 383,837 18,599 200,769 603,205
Property, plant and equipment 60,854 21,760 32,317 114,931
Exploration and evaluation assets 3,653 64,335 67,988
Total non-current assets (Excluding investments) 464,055 **** 60,789 **** 301,141 **** 825,985

​ 29

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

Mining Interests

**** Canada **** Mexico **** USA **** Total
$ $ $
Compensation 5,757 5,500 5,257 16,514
Exploration Drilling 65,243 21,184 86,427
Consulting Expenditures 66,013 144 617 66,774
Acquisition Cost 258,152 57,038 169,175 484,365
Asset retirement obligation 22,638 9,825 3,461 35,924
Depreciation 5,004 (5,166) 2,419 2,257
Tax Credits (12,445) (12,445)
Impairments (59,000) (81,000) (140,000)
Other 32,475 11,074 19,840 63,389
Total mining interest 383,837 18,599 200,769 **** 603,205

For the nine months ended September 30, 2023
Canada Mexico USA Total
$ $ $ $
Operating Gain (Loss)
Revenues 6,401 8,028 10,290 24,719
Cost of Sales (6,344) (8,690) (10,866) (25,900)
Other operating costs (17,691) (2,818) (279) (20,788)
General and administrative expenses (22,040) (1,950) (5,936) (29,926)
Exploration and evaluation (1,530) (156) (1,686)
Operating Gain (Loss) (41,204) **** (5,586) **** (6,791) **** (53,581)

**15.**OFF-BALANCE SHEET ITEMS

There are no significant off-balance sheet arrangements, other than contractual obligations and commitments mentioned above.

  1. RISKS AND UNCERTAINTIES

The Company’s activities, being the acquisition, exploration, and development of mineral properties in Canada and worldwide, is speculative and involves a high degree of risk. Certain factors, including but not limited to the ones below, could materially affect the Company's financial condition and/or future operating results, and could cause actual events to differ materially from those described in forward-looking statements made by or related to the Company. Refer to the "Cautionary Note Regarding Forward-Looking Information" for more information. The reader should carefully consider these risks as well as the information disclosed herein and in the Company’s consolidated financial statements.

There are important material risks which management believes could impact the Company’s activities. For information on risks and uncertainties, please also refer to the Risk Factors section of the Annual Information Form for the year ended December 31, 2022, which can be found on SEDAR+ (www.sedarplus.ca) and on EDGAR (www.sec.gov) under Osisko Development’s issuer profile.

Osisko Development’s development and exploration activities are subject to financing risks and additional financing may result in dilution and/or partial sale of assets

Osisko Development’s development and exploration activities are subject to financing risks. At the present time, the Company has exploration and development assets which may generate periodic revenues through test mining, but has no mines in the commercial production stage that generate positive cash flows. The Company cautions that test mining at its operations could be suspended at any time. The Company’s ability to explore for and discover potential economic projects, 30

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

and then to bring them into production, is highly dependent upon its ability to raise equity and debt capital in the financial markets. Any projects that the Company develops will require significant capital expenditures. To obtain such funds, the Company may sell additional securities including, but not limited to, the Company’s shares or some form of convertible security, the effect of which may result in a substantial dilution of the equity interests of the Company’s Shareholders. Alternatively, the Company may also sell a part of its interest in an asset in order to raise capital. There is no assurance that the Company will be able to raise the funds required to continue its exploration programs and finance the development of any potentially economic deposit that is identified on acceptable terms or at all. The failure to obtain the necessary financing(s) could have a material adverse effect on the Company’s growth strategy, results of operations, financial condition and project scheduling.

Risks related to mining operations

Mining operations are and will be subject to all the hazards and risks normally incidental to exploration, development and production of mineral resources and mineral reserves including unusual or unexpected geological formations and other conditions such as formation pressures, fire, power outages, flooding, explosions, cave-ins, landslides and the inability to obtain suitable machinery, equipment or labour, any of which could result in work stoppages, damage to property, and possible environmental damage that even a combination of careful evaluation, experience and knowledge may not eliminate or adequately mitigate. The Company may be subject to liability for pollution, cave-ins or hazards against which it cannot insure or against which it may elect not to insure. The payment of such liabilities may have a material adverse effect on the financial position of the Company.

Major expenditures are required to develop metallurgical processes and to construct mining and processing facilities at a particular site. Whether a mineral deposit will be commercially viable depends on a number of factors, some of which are: the particular attributes of the deposit, such as size, grade and proximity to infrastructure; metal prices, which are highly volatile; and governmental regulations, including those relating to prices, taxes, royalties, land tenure, land use, allowable production, importing and exporting of minerals and environmental protection.

Operations Not Supported by a Feasibility Study

Certain operations described herein, including the test mining at Bonanza Ledge II, processing of the stockpile at Sapuchi Minera, and test mining at the Trixie test mine, have been operated without the benefit of a feasibility study including mineral reserves, demonstrating economic and technical viability and, as a result there may be increased uncertainty of achieving any particular level of recovery of material or the cost of such recovery. Historically, such projects have a much higher risk of economic and technical failure. Small scale test-mining at Trixie was suspended in December 2022 and resumed in the second quarter of 2023. Even with the resumption of small-scale test mining at Trixie, there is no guarantee that production will continue as anticipated or at all or that anticipated production costs will be achieved. There is no guarantee that commercial production will commence, continue as anticipated or at all or that anticipated production costs will be achieved. The failure to commence or continue production would have a material adverse impact on the Company's ability to generate revenue and cash flow to fund operations. Failure to achieve the anticipated production costs would have a material adverse impact on the Company's cash flow and potential profitability. In continuing current operations at the Trixie test mine the Company has not based its decision to continue such operations on a feasibility study of mineral reserves demonstrating economic and technical viability (and in the case of Trixie without the benefit of a technical report demonstrating the existence of a mineral resource).

Operating Cash Flow

The Company has negative cash flow from operations. If additional funds are needed, there is no assurance that additional capital or other types of financing will be available or that these financings will be on terms at least as favourable to the Company as those previously obtained, or at all.

​ 31

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

No Earnings and History of Losses

The business of developing and exploring resource properties involves a high degree of risk and, therefore, there is no assurance that current exploration and test mining programs will result in profitable operations. The Company has not determined whether any of its properties contain economically recoverable reserves of mineralized material and currently has minimal or no revenues from its projects; therefore, the Company does not generate sufficient cash flows from its operations. There can be no assurance that significant additional losses will not occur in the future. The Company's operating expenses and capital expenditures may increase in future years with advancing exploration, development, and/or production from the Company's properties. The Company does not anticipate receiving sufficient revenues from operations to offset operational expenditures in the foreseeable future and expects to incur losses until such time as one or more of its properties enters into commercial production and generates sufficient revenues to fund continuing operations. There is no assurance that any of the Company's properties will eventually graduate to commercial operation. There is also no assurance that new capital will become available, and if it is not, the Company may be forced to substantially curtail or cease operations.

Industry Conditions

The exploration for and development of mineral deposits involve significant risks and while the discovery of an ore body may result in substantial rewards, few properties that are explored are ultimately developed into producing mines. All of the Company’s properties are in the development or exploration stage and the Company is presently not exploiting any of its properties and its future success will depend on its capacity to generate revenues from an exploited property.

The discovery of mineral deposits depends on a number of factors, including the professional qualification of its personnel in charge of exploration. Whether a mineral deposit will be commercially viable depends on a number of factors, some of which are the particular attributes of the deposit, such as size, grade and proximity to infrastructure, as well as metal prices which are highly cyclical and government regulations, including regulations relating to prices, taxes, royalties, land tenure, land use, importing and exporting of minerals and environmental protection. In the event that the Company wishes to commercially exploit one of its properties, the exact effect of these factors cannot be accurately predicted, but the combination of these factors may result in the Company not receiving an adequate return on invested capital. The Company’s operations will be subject to all the hazards and risks normally encountered in the exploration and development of mineral deposits. Mining operations generally involve a high degree of risk, including unusual and unexpected geologic formations.

Regulatory Matters

The Company’s activities are subject to governmental laws and regulations. These activities can be affected at various levels by governmental regulation governing prospecting and development, price control, taxes, labour standards and occupational health, expropriation, mine safety and other matters. Exploration and commercialization are subject to various federal, provincial and local laws and regulations relating to the protection of the environment. These laws impose high standards on the mining industry to monitor the discharge of wastewater and report the results of such monitoring to regulatory authorities, to reduce or eliminate certain effects on or into land, water or air, to progressively rehabilitate mine properties, to manage hazardous wastes and materials and to reduce the risk of worker accidents.

Failure to comply with applicable laws and regulations may result in civil or criminal fines or penalties or enforcement actions, including orders issued by regulatory or judicial authorities enjoining or curtailing operations or requiring corrective measures, installation of additional equipment or remedial actions, any of which could result in significant expenditures. The Company may also be required to compensate private parties suffering loss or damage by reason of a breach of such laws, regulations or permitting requirements. It is also possible that future laws and regulations, or more stringent enforcement of current laws and regulations by governmental authorities, could cause additional expense, capital expenditures, restrictions on or suspensions of the Company’s activities and delays in the exploration and development of the projects and properties.

​ 32

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

Amendments to current laws, regulations and permits governing operations and activities of mining companies, or more stringent implementation thereof, could have a material adverse impact on the Company and cause increases in capital expenditures or development costs or require abandonment or delays in development of new mining properties.

The Company is subject to currency fluctuations that may adversely affect the financial position of the Company.

The Company is subject to currency risks. The Company’s functional currency is the Canadian dollar, which is exposed to fluctuations against other currencies. The Company’s activities are located in Canada, Mexico and the U.S.A., and as such many of its expenditures and obligations are denominated in U.S. dollars and Mexican pesos. The Company maintains its principal office in Montreal (Canada), maintains cash accounts in Canadian dollars, U.S. dollars and Mexican pesos and has monetary assets and liabilities in Canadian dollars, U.S. dollars and Mexican pesos.

The Company’s assets and liquidities are significantly affected by changes in the Canadian/U.S. dollar and Canadian/Mexican peso exchange rates. Most expenses are currently denominated in Canadian dollars, U.S. dollars and Mexican pesos. Exchange rate movements can therefore have a significant impact on the Company’s costs. The appreciation of non-Canadian dollar currencies against the Canadian dollar can increase the costs of the Company’s activities.

The Company is subject to taxation in multiple jurisdictions and adverse changes to the taxation laws of such jurisdictions could have a material adverse effect on its profitability

The Company has operations and conducts business in multiple jurisdictions and it is subject to the taxation laws of each such jurisdiction. These taxation laws are complicated and subject to change. The Company may also be subject to review, audit and assessment in the ordinary course. Any such changes in taxation law or reviews and assessments could result in higher taxes being payable or require payment of taxes due from previous years, which could adversely affect the Company’s liquidities. Taxes may also adversely affect the Company’s ability to repatriate earnings and otherwise deploy its assets.

The Company’s exploration and developing properties that are located in jurisdictions that are subject to changes in economic and political conditions and regulations in those countries

The economics of the exploration and development of mining projects are affected by many factors, including the costs of exploration and development, variations of grade of mineralized material discovered, fluctuations in metal prices, foreign exchange rates and the prices of goods and services, applicable laws and regulations, including regulations relating to royalties, allowable production and importing and exporting goods and services. Depending on the price of minerals, the Company may determine that it is neither profitable nor advisable to acquire or develop properties.

The Company’s mineral properties are located in Canada, Mexico and the U.S.A. Economic and political conditions in these countries could adversely affect the business activities of the Company. These conditions are beyond the Company’s control, and there can be no assurances that any mitigating actions by the Company will be effective.

Changing laws and regulations relating to the mining industry or shifts in political conditions may increase the costs related to the Company’s activities including the cost of maintaining its properties. Operations may also be affected to varying degrees by changes in government regulations with respect to restrictions on exploration and development activities, price controls, export controls, income taxes, royalties, expropriation of property, environmental legislation (including specifically legislation enacted to address climate change) and mine safety. The effect of these factors cannot be accurately predicted. Economic instability could result from current global economic conditions and could contribute to currency volatility and potential increases to income tax rates, both of which could significantly impact the Company’s profitability.

The Company’s activities are subject to extensive laws and regulations governing worker health and safety, employment standards, waste disposal, protection of historic and archaeological sites, mine development, protection of endangered and protected species and other matters. Regulators have broad authority to shut down and/or levy fines against facilities that do not comply with regulations or standards. 33

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

Risk factors specific to certain jurisdictions are described throughout, including specifically “Security in Mexico”. The occurrence of the various factors and uncertainties related to economic and political risks of operating in the Company’s jurisdictions cannot be accurately predicted and could have a material adverse effect on the Company.

Security in Mexico

In recent years, criminal activity and violence have increased and continue to increase in parts of Mexico. The mining sector has not been immune to the impact of criminal activity and violence, including in the form of kidnapping for ransom and extortion by organized crime, direct armed robberies of mining operations and the theft and robbery of supply convoys, including specifically for diesel. The Company takes measures to protect employees, property and production facilities from these and other security risks. There can be no assurance, however, that security incidents, in the future, will not have a material adverse effect on our operations.

Some of the Company’s mineral assets are located outside of Canada and are held indirectly through foreign affiliates.

It may be difficult if not impossible to enforce judgments obtained in Canadian courts predicated upon the civil liability provisions of the securities laws of certain provinces against the Company’s assets that are located outside of Canada.

Permits, Licences and Approvals

The operations of the Company require licences and permits from various governmental authorities. The Company believes it holds or is in the process of obtaining all necessary licences and permits to carry on the activities, which it is currently conducting under applicable laws and regulations. Such licences and permits are subject to changes in regulations and in various operating circumstances. There can be no guarantee that the Company will be able to obtain all necessary licences and permits that may be required to maintain its mining activities, construct mines or milling facilities and commence operations of any of its exploration properties. In addition, if the Company proceeds to production on any exploration property, it must obtain and comply with permits and licences which may contain specific conditions concerning operating procedures, water use, the discharge of various materials into or on land, air or water, waste disposal, spills, environmental studies, abandonment and restoration plans and financial assurances. There can be no assurance that the Company will be able to obtain such permits and licences or that it will be able to comply with any such conditions.

Any mergers, acquisitions or joint ventures would be accompanied by risks

The Company may evaluate from time to time opportunities to merge, acquire and joint venture assets and businesses or conduct any other type of transaction. Global landscape has changed and there are risks associated to such transactions due to liabilities and evaluations with the aggressive timelines of closing transactions from increased competition. There is also a risk that the review and examination process might be inadequate and cause material negative outcomes. These transactions may be significant in size, may change the scale of the Company’s business and may expose it to new geographic, political, operating, financial and geological risks. Any transactions would be accompanied by risks, such as the difficulty of assimilating the operations and personnel; the potential disruption of the Company’s ongoing business; the inability of management to maximize the financial and strategic position of the Company; the maintenance of uniform standards, controls, procedures and policies; the impairment of relationships with employees, customers and contractors as a result of any integration of new management personnel; dilution of the Company’s present shareholders or of its interests in its assets or the decision to grant interests to a joint venture partner; and the potential unknown liabilities. There can be no assurance that the Company would be successful in overcoming these risks or any other problems encountered in connection with such transactions or joint ventures. There may be no right for shareholders to evaluate the merits or risks of any future transaction or joint venture undertaken except as required by applicable laws and regulations.

Indigenous title claims, rights to consultation/accommodation, and the Company’s relationship with local communities may affect the Company’s existing exploration and development projects.

Governments in many jurisdictions must consult with indigenous peoples and First Nations with respect to grants of mineral rights or surface rights and the issuance or amendment of project authorizations. Consultation and other rights of indigenous 34

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

peoples and first nations may require accommodations, including undertakings regarding employment, royalty payments and other matters. This may affect the Company’s ability to acquire, within a reasonable time frame, effective mineral titles or surface rights in these jurisdictions, including in some parts of Canada, Mexico and the USA in which indigenous or local communities’ titles are claimed, and may affect the timetable and costs of development of mineral properties in these jurisdictions. The risk of unforeseen indigenous title claims also could affect exploration and development projects. These legal requirements may also affect the Company’s ability to transfer existing projects or to develop new projects.

The Company’s relationship with the communities in which it conducts activities are critical to ensure the future success of its existing activities and the exploration and development of its projects. There is an increasing level of public concern relating to the perceived effect of mining activities on the environment and on communities impacted by such activities. Adverse publicity relating to the mining industry generated by non-governmental organizations and others could have an adverse effect on the Company’s reputation or financial condition and may impact its relationship with the communities in which it conducts activities. While the Company is committed to working in a socially responsible manner, there is no guarantee that the Company’s efforts in this regard will mitigate this potential risk.

The inability of the Company to maintain positive relationships with local communities may result in additional obstacles to permitting, increased legal challenges, or other disruptive operational issues at any of the Company’s projects, and could have a significant adverse impact on the Company’s share price and financial condition.

Competition

The Company activities are directed towards the exploration, evaluation and development of mineral deposits. There is no certainty that the expenditures to be made by the Company will result in discoveries of commercial quantities of mineral deposits. There is aggressive competition within the mining industry for the discovery and acquisition of properties considered to have commercial potential. The Company will compete with other interests, many of which have greater financial resources than it will have, for the opportunity to participate in promising projects. Significant capital investment is required to achieve commercial production from successful exploration efforts, and the Company may not be able to successfully raise funds required for any such capital investment.

The Company may be impacted by Anti-Bribery laws.

The Canadian Corruption of Foreign Public Officials Act and the U.S. Foreign Corrupt Practices Act and anti-bribery laws in other jurisdictions where we do business, prohibit companies and their intermediaries from making improper payments for the purposes of obtaining or retaining business or other commercial advantage. The Company’s policies mandate compliance with these anti-bribery laws, which often carry substantial penalties. The Company operates in jurisdictions that have experienced governmental and private sector corruption to some degree, and, in certain circumstances, strict compliance with anti-bribery laws may conflict with certain local customs and practices. There can be no assurances that the Company’s internal control policies and procedures will always protect it from reckless or other inappropriate acts committed by the Company’s affiliates, employees or agents. Violations of these laws, or allegations of such violations, could have a material adverse effect on the Company’s business, financial position and results of operations.

Osisko Development may experience difficulty attracting and retaining qualified management to grow its business, which could have a material adverse effect on the Company’s business and financial condition.

The Company is dependent on certain members of Management, particularly its Chief Executive Officer. The loss of their services could adversely affect the Company.

The Company is dependent on the services of key executives and other highly skilled personnel focused on advancing its corporate objectives as well as the identification of new opportunities for growth and funding. The loss of these persons or its inability to attract and retain additional highly skilled employees required for its activities may have a material adverse effect on the Company’s business and financial condition. Further, while certain of the Company’s officers and directors have experience in the exploration, development and operation of mineral properties, the Company remains highly dependent upon contractors and third parties in the performance of their exploration and development activities. There can 35

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

be no guarantee that such contractors and third parties will be available to carry out such activities on behalf of the Company or be available upon commercially acceptable terms.

Conflicts of Interest

Certain directors and officers of the Company also serve as directors and officers of other companies involved in natural resource exploration and development; consequently, there is a possibility that such directors and officers will be in a position of conflict of interest. Any decision made by such directors and officers involving the Company will be made in accordance with their duties and obligations to deal fairly and in good faith with the Company and such other companies. In addition, such directors and officers will declare, and refrain from voting on, any matter in which such directors and officers may have a material conflict of interest.

Uninsured Hazards

The Company could be held responsible for certain events including environmental pollution, cave-ins or other hazards against which a corporation such as the Company cannot insure or against which it may elect not to insure, taking into consideration the importance of the premiums or other reasons. The payment of amounts relating to liability of the aforementioned hazards could cause the loss of the Company’s assets.

Mineral resource and mineral reserve estimates have inherent uncertainty

Mineral resource and mineral reserve figures are only estimates. Such estimates are expressions of judgment based on knowledge, mining experience, analysis of drilling results and industry practices. While the Company believes that the mineral resource and mineral reserve estimates, as applicable, in respect of properties in which the Company holds a direct interest reflect best estimates, the estimating of mineral resources and mineral reserves is a subjective process and the accuracy of mineral resource and mineral reserve estimates is a function of the quantity and quality of available data, the accuracy of statistical computations, and the assumptions used and judgments made in interpreting available engineering and geological information. There is significant uncertainty in any mineral resource and mineral reserve estimate and the actual deposits encountered and the economic viability of a deposit may differ materially from estimates. Estimated mineral resources and mineral reserves may have to be re-estimated based on changes in prices of gold or other minerals, further exploration or development activity or actual production experience. This could materially and adversely affect estimates of the volume or grade of mineralization, estimated recovery rates or other important factors that influence such estimates. In addition, mineral resources are not mineral reserves and there is no assurance that any mineral resource estimate will ultimately be reclassified as proven or probable mineral reserves. Mineral resources which are not mineral reserves do not have demonstrated economic viability.

Economics of developing mineral properties

Mineral exploration and development is speculative and involves a high degree of risk. While the discovery of an ore body may result in substantial rewards, few properties which are explored are commercially mineable and ultimately developed into producing mines. There is no assurance that any exploration properties will be commercially mineable.

Should any mineral resources exist, substantial expenditures will be required to confirm mineral reserves which are sufficient to commercially mine and to obtain the required environmental approvals and permitting required to commence commercial operations. The decision as to whether a property contains a commercially viable mineral deposit and should be brought into production will depend upon the results of exploration programs, preliminary economic assessment and/or feasibility studies, and the recommendations of duly qualified engineers and/or geologists, all of which involves significant expense. This decision will involve consideration and evaluation of several significant factors including, but not limited to: (a) costs of bringing a property into production, including exploration and development work, preparation of, if applicable, preliminary economic assessment and production feasibility studies and construction of production facilities; (b) availability and costs of financing; (c) ongoing costs of production; (d) metal prices; (e) environmental compliance regulations and restraints (including potential environmental liabilities associated with historical exploration activities); and (f) political climate and/or governmental regulation and control. Development projects are also subject to the successful completion of engineering 36

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

studies, issuance of necessary governmental permits, and availability of adequate financing. Development projects have no operating history upon which to base estimates of future cash flow.

Factors beyond the control of Osisko Development

The potential profitability of mineral properties is dependent upon many factors beyond the Company’s control. For instance, world prices of and markets for minerals are unpredictable, highly volatile, potentially subject to governmental fixing, pegging and/or controls and respond to changes in domestic, international, political, social and economic environments. Another factor is that rates of recovery of minerals from mined material (assuming that such mineral deposits are known to exist) may vary from the rate experienced in tests and a reduction in the recovery rate will adversely affect profitability and, possibly, the economic viability of a property. Profitability also depends on the costs of operations, including costs of labour, equipment, electricity, environmental compliance or other production inputs. Such costs will fluctuate in ways the Company cannot predict and are beyond the Company’s control, and such fluctuations will impact on profitability and may eliminate profitability altogether. Additionally, due to worldwide economic uncertainty, the availability and cost of funds for development and other costs have become increasingly difficult, if not impossible, to project. These changes and events may materially affect the financial performance of the Company and they may also negatively impact the project schedule.

Osisko Development may be subject to liability or sustain loss for certain risks and hazards against which it does not or cannot economically insure

Mining is capital intensive and subject to a number of risks and hazards, including environmental pollution, accidents or spills, industrial and transportation accidents, labour disputes, changes in the regulatory environment, natural phenomena (such as inclement weather conditions, earthquakes, pit wall failures and cave-ins) and encountering unusual or unexpected geological conditions. Such risk and hazards might impact the Company’s business. Consequently, many of the foregoing risks and hazards could result in damage to, or destruction of, the Company’s mineral properties or future processing facilities, personal injury or death, environmental damage, delays in or interruption of or cessation of their exploration or development activities, delay in or inability to receive required regulatory approvals, or costs, monetary losses and potential legal liability and adverse governmental action. Osisko Development may be subject to liability or sustain loss for certain risks and hazards against which it does not or cannot insure or against which it may reasonably elect not to insure because of the cost. This lack of insurance coverage could result in material economic harm to the Company.

Environmental risks and hazards

Osisko Development is subject to environmental regulation in the jurisdictions in which it operates. These regulations mandate, among other things, the maintenance of air and water quality standards and land reclamation. They also set forth limitations on the general, transportation, storage and disposal of solid and hazardous waste. Environmental legislation is evolving in a manner which will require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and a heightened degree of responsibility for companies and their officers, directors and employees. There is no assurance that future changes in environmental regulation, if any, will not adversely affect the Company’s operations. Environmental hazards may exist on the properties which are unknown to the Company at present and which have been caused by previous or existing owners or operators of the properties. Reclamation costs are uncertain and planned expenditures estimated by management may differ from the actual expenditures required.

Fluctuation in market value of Osisko Development Common Shares

The market price of Osisko Development Common Shares is affected by many variables not directly related to the corporate performance of the Company, including the strength of the economy generally, the availability and attractiveness of alternative investments, and the breadth of the public market for the stock. The effect of these and other factors on the market price of the Osisko Development Shares in the future cannot be predicted and may cause decreases in asset values, which may result in impairment losses.

​ 37

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

Cybersecurity Threats

The Company’s operations depend, in part, on how well it and its suppliers protect networks, technology systems and software against damage from a number of threats, including viruses, security breaches and cyber-attacks. Cybersecurity threats include attempts to gain unauthorized access to data or automated network systems and the manipulation or improper use of information technology systems. A failure of any part of the Company’s information technology systems could, depending on the nature of such failure, materially adversely impact the Company’s reputation, financial condition and results of operations. The Company is subject to cybersecurity attacks and related threats from time to time. Although to date the Company has not experienced any material losses relating to cyber-attacks or other information security breaches, there can be no assurance that it will not incur such losses in the future. The risk and exposure to these matters cannot be fully mitigated because of, among other things, the evolving nature of these threats. As cyber threats continue to evolve, the Company may be required to expend additional resources to continue to modify or enhance protective measures or to investigate and remediate any system vulnerabilities. In addition, the Company’s insurance coverage for cyber-attacks may not be sufficient to cover all the losses it may experience as a result of a cyber incident. The Company and its third party service provides also collects, uses, discloses, stores, transmits and otherwise processes customer, supplier and employee and others’ data as part of its business and operations, which may include personal data or confidential or proprietary information. There can be no assurance that any security measures that the Company or its third-party service providers have implemented will be effective against current or future security threats. If a compromise of such data were to occur, the Company may become liable under its contracts with other parties and under applicable law for damages and incur penalties and other costs to respond to, investigate and remedy such an incident. Depending on the facts and circumstances of such an incident, these damages, penalties, fines and costs could be significant. Any such event could harm the Company’s reputation and result in litigation against it.

**17.**DISCLOSURE CONTROLS, PROCEDURES AND INTERNAL CONTROLS OVER FINANCIAL REPORTING (ICFR)

The Company is required to comply with National Instrument 52‐109, Certification of Disclosure in Issuers’ Annual and Interim Filings. The certification of interim filings requires disclosure in the MD&A for any changes in the internal controls that have materially affected or are reasonably likely to materially affect the internal control over financial reporting. Management confirms that no material changes were made to the internal controls over financial reporting during the nine-month period ended September 30, 2023. The Chief Executive Officer and Chief Financial Officer have each signed the certificate 52‐109F2, Certification of Interim Filings, which is located on SEDAR+ at www.sedarplus.ca.

Additional information on the Company is available through regular filings of press releases, financial statements, and the

Annual Information Form on SEDAR+ (www.sedarplus.ca). These documents and other information may also be found on the Company’s website at www.osiskodev.com.

**18.**BASIS OF PRESENTATION OF THE CONSOLIDATED FINANCIAL STATEMENTS

These consolidated condensed interim financial statements have been prepared in accordance with the International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board (“IASB”). The accounting policies, methods of computation and presentation applied in these consolidated financial statements are detailed in the financial statements notes.

**19.**CRITICAL ACCOUNTING ESTIMATES AND JUDGEMENTS

Estimates and assumptions are continually evaluated and are based on historical experience and other factors, including expectations of future events that are believed to be reasonable under the circumstances. The determination of estimates requires the exercise of judgement based on various assumptions and other factors such as historical experience and current and expected economic conditions. Actual results could differ from those estimates. 38

Table of Contents

Osisko Development Corp. Management’s Discussion and Analysis
For the three and nine months ended September 30, 2023

Critical accounting estimates and assumptions as well as critical judgements in applying the Company’s accounting policies are detailed in the consolidated financial statements for the three and nine months ended September 30, 2023 and 2022 as well as in the audited financial statements for the three and twelve months ended December 31, 2022.

**20.**FINANCIAL INSTRUMENTS

All financial instruments are required to be measured at fair value on initial recognition. The fair value is based on quoted market prices, unless the financial instruments are not traded in an active market. In this case, the fair value is determined by using valuation techniques like discounted cash flows, the Black-Scholes option pricing model or other valuation techniques. Measurement in subsequent periods depends on the classification of the financial instrument. A description of financial instruments and their fair value is included in the condensed consolidated financial statements for the quarter ended September 30, 2023

**21.**TECHNICAL INFORMATION

The scientific and geological technical information contained in this MD&A has been reviewed and approved by Maggie Layman a "Qualified Persons" (“QP”) as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

**22.**SHARE CAPITAL STRUCTURE

As of the date of this MD&A, the following number of common shares of the Company and other securities of the Company exercisable for common shares of the Company are outstanding:

Securities **** Common shares on exercise
Common shares 84,097,831
Stock options 2,799,356
RSU’s 1,121,151
DSU’s 305,597
Warrants 31,888,451
Fully diluted share capital **** 120,212,386

**23.**APPROVAL

The Board oversees Management’s responsibility for financial reporting and internal control systems through its Audit Committee. The Audit Committee meets quarterly with Management and with Company’s independent auditors to review the scope and results of the annual audit and quarterly reviews, respectively, and to review the financial statements and related financial reporting and internal control matters before the financial statements are approved by the Board and submitted to the shareholders. The Board has approved the Financial Statements and the disclosure contained in this MD&A as of November 8, 2023. 39

Exhibit 99.3

FORM 52-109F2

CERTIFICATION OF INTERIM FILINGS

FULL CERTIFICATE

I, Sean Roosen, Chair of the Board and Chief Executive Officer of Osisko Development Corp., certify the following:

1. Review: I have reviewed the interim financial report and interim MD&A (together, the “interim filings”) of Osisko Development Corp. (the “issuer”) for the interim period ended September 30, 2023.

2. No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.

3. Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.

4. Responsibility: The issuer’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in Regulation 52-109 respecting Certification of Disclosure in Issuers’ Annual and Interim Filings, for the issuer.

5. Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer’s other certifying officer(s) and I have, as at the end of the period covered by the interim filings

(a) designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that

(i) material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and

(ii) information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and

(b) designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP.

5.1 Control framework: The control framework the issuer’s other certifying officer(s) and I used to design the issuer’s ICFR is Internal Control-Integrated Framework (2013) (COSO Framework) published by The Committee of Sponsoring Organizations of the Treadway Commission (COSO).

5.2 ICFR – material weakness relating to design: N/A

5.3Limitation on scope of design: N/A

6. Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer’s ICFR that occurred during the period beginning on July 1, 2023 and ended on September 30, 2023 that has materially affected, or is reasonably likely to materially affect, the issuer’s ICFR.

Date: November 8, 2023
(s) “Sean Roosen”
Sean Roosen
Chair of the Board and Chief Executive Officer

Exhibit 99.4

FORM 52-109F2

CERTIFICATION OF INTERIM FILINGS

FULL CERTIFICATE

I, Alexander Dann, Chief Financial Officer and Vice President, Finance of Osisko Development Corp., certify the following:

1. Review: I have reviewed the interim financial report and interim MD&A (together, the “interim filings”) of Osisko Development Corp. (the “issuer”) for the interim period ended September 30, 2023.

2. No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.

3. Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.

4. Responsibility: The issuer’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in Regulation 52-109 respecting Certification of Disclosure in Issuers’ Annual and Interim Filings, for the issuer.

5. Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer’s other certifying officer(s) and I have, as at the end of the period covered by the interim filings

(a) designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that

(i) material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and

(ii) information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and

(b) designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP.

5.1 Control framework: The control framework the issuer’s other certifying officer(s) and I used to design the issuer’s ICFR is Internal Control-Integrated Framework (2013) (COSO Framework) published by The Committee of Sponsoring Organizations of the Treadway Commission (COSO).

5.2ICFR – material weakness relating to design: N/A

5.3Limitation on scope of design: N/A

6. Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer’s ICFR that occurred during the period beginning on July 1, 2023 and ended on September 30, 2023 that has materially affected, or is reasonably likely to materially affect, the issuer’s ICFR.

Date: November 8, 2023
(s) “Alexander Dann”
Alexander Dann
Chief Financial Officer and Vice President, Finance