6-K

Orla Mining Ltd. (ORLA)

6-K 2024-11-13 For: 2024-09-30
View Original
Added on April 06, 2026

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington,D.C. 20549

FORM 6-K

Reportof Foreign Private Issuer

Pursuantto Rule 13****a-16 or 15d-16

UNDERthe Securities Exchange Act of 1934

For the month of November, 2024

Commission File Number: 001-39766

ORLA MINING LTD.

(Translation of registrant's name into English)

Suite 1010, 1075 West Georgia StreetVancouver, British Columbia,

V6E 3C9, Canada

(Address of principal executive offices)

Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F.

Form 20-F    ¨ Form 40-F    x

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1):  ¨

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7):   ¨

INCORPORATION BY REFERENCE

Exhibit 99.1 (Condensed Interim Consolidated Financial Statements for the Three and Nine Months ended September 30, 2024 and 2023) and Exhibit 99.2 (Management's Discussion and Analysis for the Three and Nine Months ended September 30, 2024 and 2023) to this Report on Form 6-K are incorporated by reference into this report and are hereby incorporated by reference into and as an exhibit to the registrant's Registration Statement on Form F-10 (File No. 333-271236) and Registration Statement on Form S-8 (File No. 333-272171), in both cases as amended or supplemented, to the extent not superseded by documents or reports subsequently filed or furnished by us under the Securities Act of 1933 or the Securities Exchange Act of 1934, in each case as amended.


SIGNATURE

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

ORLA MINING LTD.
Date: November 12, 2024 /s/ Etienne Morin
Name: Etienne Morin
Title: Chief Financial Officer

EXHIBIT INDEX

Exhibit Description of Exhibit
99.1 Condensed Interim Consolidated Financial<br> Statements for the three and nine months ended September 30, 2024 and 2023
99.2 Management’s Discussion and<br> Analysis for the three and nine months ended September 30, 2024 and 2023
99.3 Certification of Interim Filings<br> – Chief Executive Officer
99.4 Certification of Interim Filings<br> – Chief Financial Officer

Exhibit 99.1

Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

Presented in United States dollars

ORLA MINING LTD.

Condensed Interim Consolidated Balance Sheets

(Unaudited - thousands of United States dollars)

September 30,<br> 2024 December 31,<br> 2023
ASSETS
Current assets
Cash and cash equivalents $ 180,898 $ 96,632
Trade and other receivables 200 379
Value added taxes recoverable (note 10) 8,132 15,571
Inventory (note 9) 28,830 29,451
Prepaid expenses 5,428 3,142
223,488 145,175
Restricted cash 810 1,011
Value added taxes recoverable (note 10) 826
Long term inventory (note 9) 6,517 5,627
Property, plant and equipment (note 11) 205,034 211,719
Exploration and evaluation properties (note 12) 182,168 170,000
Other non-current assets 680 1,420
TOTAL ASSETS $ 618,697 $ 535,778
LIABILITIES
Current liabilities
Trade payables and accrued liabilities (note 14) $ 23,797 $ 20,656
Income taxes payable 25,462 8,002
49,259 28,658
Lease obligations (note 16) 1,398 1,993
Long term debt (note 15) 58,350 88,350
Deferred revenue 8,542 8,176
Site closure provisions (note 17) 8,239 7,424
Other long term liabilities 849 443
Deferred tax liabilities 11,327 193
TOTAL LIABILITIES 137,964 135,237
SHAREHOLDERS' EQUITY
Share capital (note 18) 492,554 474,361
Reserves 24,873 24,387
Accumulated other comprehensive loss (1,820 ) (439 )
Accumulated deficit (34,874 ) (97,768 )
TOTAL SHAREHOLDERS’ EQUITY 480,733 400,541
TOTAL LIABILITIES AND SHAREHOLDERS’ EQUITY $ 618,697 $ 535,778
/s/ Jason Simpson /s/ Elizabeth McGregor
--- ---
Jason<br> Simpson, Director Elizabeth<br> McGregor, Director

The accompanying notes are an integral part of these condensed interim consolidated financial statements.

Page 2

ORLA MINING LTD.

Condensed Interim Consolidated Statements of Income and Comprehensive Income

(Unaudited - thousands of United States dollars, except per-share amounts)

Three months ended<br> September 30 Nine months ended <br> September 30
2024 2023 2024 2023
REVENUE (note 4) $ 99,307 $ 60,294 $ 251,155 $ 170,697
COST OF SALES
Operating costs (note 5(a)) (20,509 ) (16,039 ) (57,142 ) (41,289 )
Depletion and depreciation (11,597 ) (7,574 ) (29,971 ) (20,255 )
Royalties (note 5(b)) (2,466 ) (1,479 ) (6,232 ) (4,233 )
(34,572 ) (25,092 ) (93,345 ) (65,777 )
EARNINGS FROM MINING OPERATIONS 64,735 35,202 157,810 104,920
GENERAL AND ADMINISTRATIVE EXPENSES (note 7) (4,018 ) (3,123 ) (11,765 ) (9,495 )
EXPLORATION AND EVALUATION (note 6) (13,653 ) (11,233 ) (25,046 ) (25,300 )
OTHER
Interest income 1,916 1,484 9,036 3,804
Depreciation (121 ) (117 ) (374 ) (355 )
Share based payments (note 20) (712 ) (656 ) (2,966 ) (2,569 )
Interest and accretion expense (note 8) (1,746 ) (3,483 ) (5,888 ) (9,385 )
Loss on extinguishment of credit facility (1,547 ) (1,547 )
Foreign exchange and other gains (losses) 2,276 1,207 5,300 (835 )
1,613 (3,112 ) 5,108 (10,887 )
INCOME BEFORE TAXES 48,677 17,734 126,107 59,238
Income taxes (note 27) (27,533 ) (12,364 ) (63,213 ) (27,806 )
INCOME FOR THE PERIOD $ 21,144 $ 5,370 $ 62,894 $ 31,432
OTHER COMPREHENSIVE INCOME (LOSS)
Items that may in future periods be reclassified to profit or loss:
Foreign currency differences arising on translation 500 76 (1,381 ) 137
TOTAL COMPREHENSIVE INCOME $ 21,644 $ 5,446 $ 61,513 $ 31,569
WEIGHTED AVERAGE NUMBER OF COMMON SHARES OUTSTANDING (note 19)
Basic (millions) 320.3 313.8 317.8 310.5
Diluted (millions) 334.6 331.5 332.0 328.9
EARNINGS PER SHARE (note 19)
Basic $ 0.07 $ 0.02 $ 0.20 $ 0.10
Diluted $ 0.06 $ 0.02 $ 0.19 $ 0.10

The accompanying notes are an integral part of these condensed interim consolidated financial statements.

Page 3

ORLA MINING LTD.

Condensed Interim Consolidated Statements of Cash Flows

(Unaudited - thousands of United States dollars)

Threemonths endedSeptember 30 Nine months ended<br> September 30
2024 2023 2024 2023
OPERATING ACTIVITIES
Income for the period $ 21,144 $ 5,370 $ 62,894 $ 31,432
Adjustments for:
Interest and accretion expense (note 8) 1,746 3,483 5,888 9,385
Income tax expense 27,533 12,364 63,213 27,806
Income taxes paid (217 ) (440 ) (14,492 ) (27,392 )
Income tax instalments paid (8,809 ) (7,654 ) (15,534 ) (19,811 )
Payment of cash settled RSUs and DSUs (466 )
Interest income not related to operating activities (4,136 )
Adjustments for items not affecting cash:
Depreciation and depletion 11,718 7,691 30,345 20,610
Share based payments expense (note 20) 712 656 2,966 2,569
Unrealized foreign exchange loss (gain) (2,074 ) (1,437 ) (4,505 ) (2,143 )
Other 234 1,757 217 2,156
Cash provided by operating activities before changes in non-cash working capital 51,987 21,790 126,856 44,146
Changes in non-cash working capital (note 22(b)) 712 3,229 2,962 (753 )
Cash provided by operating activities 52,699 25,019 129,818 43,393
INVESTING ACTIVITIES
Purchase of plant and equipment (4,165 ) (1,864 ) (13,546 ) (4,538 )
Expenditures on mineral properties (3,710 ) (4,560 ) (10,689 ) (9,433 )
Acquisition of Contact Gold Corp., net of cash received (note 13) (2,666 )
Deposits and payments on long term assets 283 47 1,816 (119 )
Restricted cash and environmental bonding 205 147 200 2,424
Value added taxes and interest received 8,368
Cash used in investing activities (7,387 ) (6,230 ) (16,517 ) (11,666 )
FINANCING ACTIVITIES
Proceeds from issuance of common shares, net 18,434
Principal repayments of the Revolving Facility and Credit Facility (note 15) (20,000 ) (30,000 ) (11,100 )
Proceeds from exercise of stock options and warrants 2,591 2,283 7,180 7,168
Interest paid (1,476 ) (2,142 ) (5,148 ) (9,094 )
Lease payments (186 ) (285 ) (669 ) (715 )
Cash provided by (used in) financing activities (19,071 ) (144 ) (28,637 ) 4,693
Effects of exchange rate changes on cash 355 (418 ) (398 ) 59
Net increase in cash 26,596 18,227 84,266 36,479
Cash, beginning of period 154,302 114,530 96,632 96,278
CASH, END OF PERIOD $ 180,898 $ 132,757 $ 180,898 $ 132,757

Supplemental cash flow information (note 22)

The accompanying notes are an integral part of these condensed interim consolidated financial statements.

Page 4

ORLA MINING LTD.

Condensed Interim Consolidated Statements of Changes in Equity

(Unaudited - thousands of United States dollars)

Common shares Reserves
Number of<br> shares<br> (thousands) Amount Share based<br> payments<br> reserve Warrants<br> reserve Total Accumulated <br> Other<br> Comprehensive<br> Income (loss) Accumulated<br> deficit Total
Balance at January 1, 2023 305,809 $ 445,316 $ 9,897 $ 14,112 $ 24,009 $ (1,583 ) $ (70,758 ) $ 396,984
Shares issued pursuant to top up right 3,987 18,434 18,434
Shares issued for property payments 62 242 242
Warrants exercised (note 17) 1,282 3,190 (343 ) (343 ) 2,847
Options exercised (note 19) 3,223 6,108 (1,787 ) (1,787 ) 4,321
RSUs redeemed (note 19) 58 228 (228 ) (228 )
Share based payments (note 19) 2,313 2,313 2,313
Income for the period 31,432 31,432
Other comprehensive income 137 137
Balance at September 30, 2023 314,421 $ 473,518 $ 10,195 $ 13,769 $ 23,964 $ (1,446 ) $ (39,326 ) $ 456,710
Balance at January 1, 2024 315,074 $ 474,361 $ 10,620 $ 13,767 $ 24,387 $ (439 ) $ (97,768 ) $ 400,541
Shares issued pursuant to acquisition, (note 13) 2,221 8,937 8,937
Share issuance costs (71 ) (71 )
Warrants exercised (note 18) 2,031 5,003 (539 ) (539 ) 4,464
Options exercised (note 20) 1,406 3,701 (985 ) (985 ) 2,716
RSUs redeemed (note 20) 139 623 (623 ) (623 )
Share based payments (note 20) 2,633 2,633 2,633
Income for the period 62,894 62,894
Other comprehensive loss (1,381 ) (1,381 )
Balance at September 30, 2024 320,871 $ 492,554 $ 11,645 $ 13,228 $ 24,873 $ (1,820 ) $ (34,874 ) $ 480,733

The accompanying notes are an integral part of these condensed interim consolidated financial statements.

Page 5

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

1. CORPORATE INFORMATION AND NATURE OF OPERATIONS

Orla Mining Ltd. was incorporated in Alberta in 2007 and was continued into British Columbia in 2010 and subsequently into Ontario under the Business Corporations Act (Ontario) in 2014. In 2016, the Company was continued as a federal company under the Canada Business Corporations Act. The “Company”, “Orla”, “we”, and “our” refer to Orla Mining Ltd. and its subsidiaries. The registered office of the Company is located at Suite 1010, 1075 West Georgia Street, Vancouver, Canada.

The Company is engaged in the acquisition, exploration, development, and exploitation of mineral properties, and holds the Camino Rojo gold and silver mine in Zacatecas State, Mexico, the South Railroad and Lewis gold projects in Nevada, USA, and the Cerro Quema gold project in Panama.

These condensed interim consolidated financial statements have been prepared on the assumption that the Company will continue as a going concern, meaning it will continue in operation for the foreseeable future and will be able to realize assets and discharge liabilities in the ordinary course of operations. Different bases of measurement may be appropriate if the Company is not expected to continue operations for the foreseeable future.

2. BASIS OF PREPARATION
(a) Statement of compliance and basis of presentation
--- ---

We have prepared these condensed interim consolidated financial statements of the Company in accordance with IAS 34 «Interim Financial Reporting» and do not include all the information required for full annual financial statements.

The preparation of these condensed interim consolidated financial statements requires management to make judgments, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets, liabilities, income and expenses. Actual results may differ from these estimates.

These condensed interim consolidated financial statements are presented in United States dollars and include the accounts of the Company and its wholly owned subsidiaries. All material intercompany transactions and balances have been eliminated upon consolidation.

On November 12, 2024, the Board of Directors approved these condensed interim consolidated financial statements for issuance.

3. MATERIAL ACCOUNTING POLICY INFORMATION

These condensed interim consolidated financial statements should be read in conjunction with the Company’s audited consolidated financial statements as at and for the years ended December 31, 2023 and 2022.

We applied the same accounting policies in these condensed interim consolidated financial statements as those applied in the Company’s audited consolidated financial statements as at and for the year ended December 31, 2023.

Page 6

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

In preparing these condensed interim consolidated financial statements, the significant judgements we made in applying the Company’s accounting policies and the key sources of estimation uncertainty were the same as those that applied to the audited consolidated financial statements as at and for the year ended December 31, 2023.

4. REVENUE
Three months ended <br> September 30 Nine months ended <br> September 30
--- --- --- --- --- --- --- --- ---
2024 2023 2024 2023
Gold $ 94,791 $ 59,671 $ 242,073 $ 169,175
Silver 4,516 623 9,082 1,522
Revenue $ 99,307 $ 60,294 $ 251,155 $ 170,697
Customer A $ 5,885 $ 19,225 $ 22,866 $ 49,062
Customer B 46,954 2,889 96,334 57,311
Customer C 41,448 36,044 116,431 55,225
Others 5,020 2,136 15,524 9,099
Revenue $ 99,307 $ 60,294 $ 251,155 $ 170,697
5. COST OF SALES
--- ---
(a) Operating costs
--- ---
Three months ended <br> September 30 Nine months ended <br> September 30
--- --- --- --- --- --- --- --- ---
2024 2023 2024 2023
Mining and processing costs $ 20,188 $ 15,859 $ 56,065 $ 40,757
Refining and transportation costs 321 180 1,077 532
$ 20,509 $ 16,039 $ 57,142 $ 41,289
Page 7

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(b) Royalties
Three months ended <br> September 30 Nine months ended <br> September 30
--- --- --- --- --- --- --- --- ---
2024 2023 2024 2023
Camino Rojo Oxide 2% NSR royalty $ 1,969 $ 1,197 $ 4,976 $ 3,381
Mexican 0.5% Extraordinary Mining Duty 497 282 1,256 852
$ 2,466 $ 1,479 $ 6,232 $ 4,233
6. EXPLORATION AND EVALUATION EXPENSES
--- ---
Three months ended <br> September 30 Nine months ended <br> September 30
--- --- --- --- --- --- --- --- ---
2024 2023 2024 2023
Camino Rojo $ 2,508 $ 2,645 $ 5,941 $ 6,636
South Railroad 9,107 7,920 14,802 13,358
Cerro Quema 1,923 494 4,003 4,899
Other 115 174 300 407
$ 13,653 $ 11,233 $ 25,046 $ 25,300
7. GENERAL AND ADMINISTRATIVE EXPENSES
--- ---
Three months ended <br> September 30 Nine months ended <br> September 30
--- --- --- --- --- --- --- --- ---
2024 2023 2024 2023
Office and administrative $ 1,033 $ 929 $ 2,739 $ 2,473
Professional fees 1,159 550 2,974 1,463
Regulatory and transfer agent 43 37 369 433
Salaries and benefits 1,783 1,607 5,683 5,126
$ 4,018 $ 3,123 $ 11,765 $ 9,495
Page 8

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

8. INTEREST AND ACCRETION EXPENSE
Three months ended <br> September 30 Nine months ended <br> September 30
--- --- --- --- --- --- --- --- ---
2024 2023 2024 2023
Interest expense
Revolving Facility $ 1,313 $ $ 4,667 $
Interest expense on lease liabilities (note 16) 42 37 110 118
Credit Facility (note 15) 2,321 6,898
Fresnillo obligation 292 868
Other 141 614 362 726
Interest expense 1,496 $ 3,264 5,139 $ 8,610
Accretion expense
Accretion of site closure provisions (note 17) 128 142 383 406
Deferred revenue 122 366
Credit Facility (note 15) 77 369
Accretion expense 250 219 749 775
Interest and accretion expense $ 1,746 $ 3,483 $ 5,888 $ 9,385
9. INVENTORY
--- ---
September 30,<br> 2024 December 31,<br> 2023
--- --- --- --- ---
Current
Stockpiled ore $ 1,149 $ 913
In-process inventory 14,984 20,509
Finished goods inventory 8,472 4,041
Materials and supplies 4,225 3,988
Inventory – current $ 28,830 $ 29,451
Long term
Stockpiled ore $ 6,517 $ 5,627

Long term inventory consists of stockpiled ore that is not expected to be processed within 12 months.

Included within inventory at September 30, 2024 is $10.5 million of depreciation and depletion (December 31, 2023 — $9.2 million).

Page 9

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

10. VALUE ADDED TAXES RECOVERABLE
September 30,<br> 2024 December 31,<br> 2023
--- --- --- --- ---
Current portion $ 8,132 $ 15,571
Long term portion 826
$ 8,132 $ 16,397

Value added taxes (“VAT”) paid in Mexico are fully recoverable. However, VAT recovery returns in Mexico are subject to complex filing requirements and detailed audit or review by the fiscal authorities. Consequently, the timing of receipt of refunds is uncertain. We have used judgement in classifying the current and non-current portions of our Mexican VAT receivables. Factors that we considered include (i) the regularity of payments received, (ii) discussions with and communications from the Mexican tax authorities with respect to specific claims, and (iii) the expected length of time for refunds in accordance with Mexico’s regulations.

During the third quarter of 2024, we wrote off the 13.9 million Mexican Pesos ($0.8 million) long term portion of VAT following the unfavorable resolution of an outstanding dispute with the Mexican tax authorities.

At September 30, 2024, there were no material VAT amounts (December 31, 2023 — $0.8 million) under dispute with the taxation authorities.

Page 10

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

11. PROPERTY, PLANT AND EQUIPMENT
Producing<br> mineral<br> property Buildings Machinery<br> and<br> equipment Other<br><br> assets Other right <br> of use<br> assets Construction<br> in progress Total
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Cost
At January 1, 2023 $ 115,753 $ 72,008 $ 52,345 $ 2,620 $ 4,160 $ $ 246,886
Additions 12,705 141 2,305 823 484 4,881 21,339
Change in site closure provision (note 17) (559 ) (927 ) (593 ) (2,079 )
Derecognition (117 ) (117 )
Due to changes in exchange rates (5 ) 7 22 24
At December 31, 2023 127,899 71,222 54,052 3,450 4,549 4,881 266,053
Additions 10,689 103 15 1,201 13,428 25,436
Transfers 11,672 2,276 214 (14,162 )
Change in site closure provision (note 17) 59 59
Derecognition (586 ) (586 )
Disposals (253 ) (149 ) (1,359 ) (1,761 )
At September 30, 2024 $ 138,647 $ 82,894 $ 56,178 $ 3,530 $ 3,805 $ 4,147 $ 289,201
Accumulated depreciation
At January 1, 2023 $ 9,641 $ 6,286 $ 4,891 $ 705 $ 947 $ $ 22,470
Depletion and depreciation 13,844 9,610 6,789 563 1,115 31,921
Derecognition (5 ) (52 ) (57 )
At December 31, 2023 23,485 15,896 11,675 1,268 2,010 54,334
Disposals (253 ) (149 ) (1,359 ) (1,761 )
Depletion and depreciation 16,070 8,184 6,086 517 737 31,594
At September 30, 2024 $ 39,555 $ 24,080 $ 17,508 $ 1,636 $ 1,388 $ $ 84,167
Net book value
At December 31, 2023 $ 104,414 $ 55,326 $ 42,377 $ 2,182 $ 2,539 $ 4,881 $ 211,719
At September 30, 2024 $ 99,092 $ 58,814 $ 38,670 $ 1,894 $ 2,417 $ 4,147 $ 205,034
12. EXPLORATION AND EVALUATION PROPERTIES
--- ---

Our exploration and evaluation properties consist of the South Railroad Project in Nevada, United States and the Cerro Quema Project in Panama).

South Railroad Cerro Quema Total
At December 31, 2023 $ 160,000 $ 10,000 $ 170,000
Acquisition of Contact Gold Corp. 12,168 12,168
At September 30, 2024 $ 172,168 $ 10,000 $ 182,168
Page 11

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

13. ACQUISITION OF CONTACT GOLD CORP.

On April 29, 2024, the Company completed the acquisition of Contact Gold Corp. (“Contact”) through a court-approved plan of arrangement (the “Transaction”). On closing of the Transaction, shareholders of Contact received 0.0063 (“Exchange Ratio”) Orla shares for each share of Contact held. This resulted in the issuance of 2,220,901 Orla common shares to Contact shareholders. The Contact warrants which were outstanding at April 29, 2024 (the “Contact Warrants”) became exercisable for shares of Orla based on the Exchange Ratio, resulting in 315,000 Orla shares issuable on exercise of such warrants. We accounted for this acquisition as a purchase of assets. Accordingly, we allocated the sum of consideration paid and transaction costs incurred to the net assets acquired based on relative fair values.

The purchase consideration was calculated as follows:

Estimated fair value of 2,220,901 common shares issued by the Company $ 8,937
Transaction costs 2,676
Total purchase consideration $ 11,613

Assets acquired and liabilities assumed:

Cash and cash equivalents $ 83
Restricted cash 18
Receivables and other assets 209
Trade and other payables (717 )
Lease liabilities (27 )
Asset retirement obligations (156 )
Exploration and evaluation properties – South Railroad 12,203
Total assets acquired and liabilities assumed, net $ 11,613

The fair value of Orla common shares issued was determined using the Company’s closing share price of C$5.50 on the trading day immediately prior to the date of closing of the Transaction and the exchange rate of 1.3668 CAD/USD.

Each Contact Warrant gives the holder rights to acquire common shares of the Company in accordance with the terms of the plan of arrangement. The effective exercise price of the Contact Warrants (C$7.94 per Orla share) was determined by dividing the exercise price of the Contact warrants by the Exchange Ratio. The fair value of the Contact Warrants was determined using the Black-Scholes option pricing model. On issuance, the weighted average fair value of the Contact Warrants was C$0.93 per share issuable under the warrants. However, the effect of the Contact Warrants on the purchase consideration was immaterial and was therefore not included.

(a) Mineral properties acquired

The Contact properties acquired consist primarily of the Pony Creek property and the Green Springs property, as well as several other smaller properties.

(i) Pony Creek

The Pony Creek property is located adjacent to the South Railroad property and situated within a prospective land package along the Carlin Trend in Nevada. The property is subject to a 3% net smelter return (“NSR”) royalty in favour of Sandstorm Gold Ltd. This property is now included within the South Railroad Project for accounting purposes.

Page 12

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(ii) Green Springs

The Green Springs property is an early-stage exploration property located in the southern end of Nevada’s Cortez trend. Certain claims within Green Springs are subject to NSR royalties ranging from 3% to 4.5%.

Pursuant to an agreement with Centerra Gold Inc. (“Centerra”), dated December 8, 2022, Centerra has an option to acquire a 70% interest in Green Springs for cumulative earn-in exploration expenditures and aggregate cash payments to the Company as follows:

In thousands of US dollars Cash payments Exploration<br> expenditures<br> commitment
On signing (completed) $ 150 $
On or before December 8, 2023 (completed) 175 1,500
On or before December 8, 2024 175 2,000
On or before December 8, 2025 250 2,750
On or before December 8, 2026 250 3,750
$ 1,000 $ 10,000

Provided Centerra fulfills the total exploration expenditure commitment and makes the required cash payments, a joint venture is to be established to manage and operate the property. Both parties will proportionately fund future activities at Green Springs, subject to dilution provisions. If the Company’s interest is diluted to less than 10%, it will convert to a 1.5% NSR royalty interest.

The Company’s accounting policy is to credit any consideration received pursuant to farm-out agreements in respect of exploration and evaluation properties against the carrying amount of the exploration and evaluation asset, with any excess consideration greater than the carrying amount being credited to profit or loss. During the three and nine months ended September 30, 2024, $35,000 (2023 – $nil) were credited against properties acquired as part of Contact Gold Corp.

14. TRADE PAYABLES AND ACCRUED LIABILITIES
September 30,<br> 2024 December 31,<br> 2023
--- --- --- --- ---
Trade payables and accrued trade liabilities $ 13,754 $ 9,793
Royalties payable (note 5(b)) 3,122 2,466
Payroll related 4,355 6,532
Current portion of lease obligations (note 16) 1,205 915
Other 1,361 950
$ 23,797 $ 20,656
Page 13

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

15. LONG TERM DEBT
Credit Facility Revolving Facility
--- --- --- --- --- --- ---
At January 1, 2023 $ 122,995 $
Converted from Credit Facility to Revolving Facility (113,350 ) 113,350
Unamortized transaction costs expensed 1,455
Principal repayments during the period (11,100 ) (25,000 )
At December 31, 2023 88,350
Principal repayments during the period (30,000 )
At September 30, 2024 $ $ 58,350

In April 2022, the Company entered into a credit facility (the “Credit Facility”) consisting of a $100 million term facility and a $50 million revolving facility through a syndicate of lenders. In August 2023, the term facility was extinguished in its entirety and the amounts due thereunder were transferred to a new $150 million revolving facility (the “Revolving Facility”).

The Revolving Facility has a four-year term maturing on August 28, 2027, with an option to increase this facility to $200 million, subject to certain conditions.

The applicable interest rate for the Revolving Facility is based on the term Secured Overnight Financing Rate (“SOFR”) plus an applicable margin ranging from 2.50% to 3.75% based on the Company’s leverage ratio at the end of each fiscal quarter. During the quarter ended September 30, 2024, the average interest rate paid on the Revolving Facility was 7.9% per annum (three months ended September 30, 2023 – 7.9% on the Credit Facility).

A standby fee is payable on the undrawn portion of the Revolving Facility. The standby fee is charged at 0.56% to 0.84% depending on the leverage ratio. At September 30, 2024, the undrawn amount was $91.6 million.

We may prepay all or any portion of the amounts owed under the Revolving Facility without penalty.

The Revolving Facility is secured by the Company’s present and future assets, property and all proceeds thereof, other than present and future assets owned by Minera Cerro Quema which are excluded from the collateral. The Company is prohibited from declaring, paying or setting aside for payment any dividends unless certain financial covenants and ratios are met.

The Revolving Facility includes covenants customary for a facility of this nature, including compliance with customary restrictive covenants, and the following financial covenants all as defined in the related agreements:

· maintaining<br> a leverage ratio at less than or equal to 3.50,
· an interest<br> service coverage ratio at greater than or equal to 4,
· a tangible<br> net worth greater than or equal to $278.6 million, and
· minimum<br> liquidity in an amount greater than or equal to $15.0 million.

As at September 30, 2024, the Company was in compliance with these covenants.

Subsequent to the reporting period, the Company repaid the entirety of the outstanding balance on the Revolving Facility totaling $58.4 million.

Page 14

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

16. LEASE OBLIGATIONS

The Company has lease contracts for mining equipment, vehicles and buildings. Leases of mining equipment have lease terms of five years, while vehicles and buildings generally have lease terms between three and five years.

(a) Lease obligations
September 30,<br> 2024 December 31,<br> 2023
--- --- --- --- --- --- ---
Beginning of year $ 2,908 $ 3,173
Acquisition of Contact Gold Corp. (note 13) 27
Additions 1,201 484
Interest expense (note 8) 110 156
Lease payments (779 ) (1,125 )
Derecognition (586 )
Due to changes in exchange rates (278 ) 220
End of period $ 2,603 $ 2,908
Current (note 14) $ 1,205 $ 915
Non-current 1,398 1,993
$ 2,603 $ 2,908
(b) Lease expenses recognized
--- ---
Three months ended <br> September 30 Nine months ended <br> September 30
--- --- --- --- --- --- --- --- ---
2024 2023 2024 2023
Interest on lease liabilities $ 42 $ 37 $ 110 $ 118
Variable lease payments not included in the measurement of lease liabilities 5,449 3,333 13,033 9,917
Expenses relating to short-term leases 66 57 244 176
Expenses relating to leases of low-value<br> assets, excluding short-term leases 3 22 67
$ 5,557 $ 3,430 $ 13,409 $ 10,278
Page 15

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

17. SITE CLOSURE PROVISIONS
Camino<br> Rojo Nevada<br> projects Cerro<br> Quema<br> Project Total
--- --- --- --- --- --- --- --- --- --- ---
At December 31, 2022 $ 6,301 $ 1,617 $ 343 $ 8,261
Changes in cost estimates (1,996 ) 463 157 (1,376 )
Accretion during the period 521 18 539
At December 31, 2023 4,826 2,098 500 7,424
Acquisition of Contact Gold Corp. (note 13) 156 156
Changes in cost estimates 59 217 276
Accretion during the period (note 8) 364 19 383
At September 30, 2024 $ 5,249 $ 2,490 $ 500 $ 8,239
September 30, 2024 December 31, 2023
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Camino<br> Rojo Nevada<br><br> projects Cerro<br> Quema<br> Project Camino<br> Rojo Nevada<br> projects Cerro<br> Quema<br> Project
Estimated settlement dates 2033 to 2047 2034 2033 to 2047 2034
Undiscounted risk-adjusted cash flows $ 9,818 $ 2,558 $ 500 $ 9,765 $ 2,336 $ 500
Inflation rate 4.0 % 2.3 % 3.7 % 2.6 %
Discount rate 9.5 % 3.5 % 9.8 % 3.6 %
18. SHARE CAPITAL
--- ---
(a) Authorized share capital
--- ---

The Company’s authorized share capital consists of an unlimited number of common shares without par value and an unlimited number of preferred shares without par value.

Page 16

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(b) Warrants

The following summarizes information about shares issuable upon the exercise of warrants outstanding during the period.

Expiry date Exercise<br><br> price December 31,<br><br> 2023 Contact Gold<br><br> acquisition Exercised Expired September 30,<br><br> 2024
December 18, 2026 C$ 3.00 28,253,200 (2,030,700 ) 26,222,500
February 23, 2026 (note 13) C$ 7.94 315,000 315,000
Shares issuable upon exercise of warrants 28,253,200 315,000 (2,030,700 ) 26,537,500
Weighted average exercise price C$ 3.00 C$ 7.94 C$ 3.00 C$ C$ 3.06

Subsequent to the reporting period, the Company issued 682,500 common shares for proceeds of $1.5 million pursuant to the exercise of warrants.

19. EARNINGS PER SHARE

Earnings per share has been calculated using the weighted average number of common shares outstanding for the three months ended September 30, 2024 and 2023 as follows:

(a) Basic
Three months ended <br> September 30 Nine months ended <br> September 30
--- --- --- --- --- --- --- --- ---
2024 2023 2024 2023
Income for the period $ 21,144 $ 5,370 $ 62,894 $ 31,432
Weighted average number of common shares (thousands) 320,336 313,817 317,830 310,462
Basic earnings per share $ 0.07 $ 0.02 $ 0.20 $ 0.10
Page 17

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(b) Diluted
Three months ended <br> September 30 Nine months ended <br> September 30
--- --- --- --- --- --- --- --- ---
2024 2023 2024 2023
Income for the period $ 21,144 $ 5,370 $ 62,894 $ 31,432
Weighted average number of common shares (thousands) 320,336 313,817 317,830 310,462
Dilutive potential ordinary shares
Warrants 11,881 14,181 11,588 14,181
Options 523 2,027 750 2,788
RSUs 482 311 472 336
DSUs 895 677 832 634
Bonus shares 500 500 500 500
Weighted average number of ordinary shares 334,617 331,513 331,972 328,901
Diluted earnings per share $ 0.06 $ 0.02 $ 0.19 $ 0.10
20. SHARE-BASED PAYMENTS
--- ---

The Company has five different forms of share-based payments for eligible recipients – stock options, restricted share units (“RSUs”), deferred share units (“DSUs”), performance share units (“PSUs”), and bonus shares. The bonus shares have fully vested but have not yet been issued.

Three months ended <br> September 30 Nine months ended <br> September 30
Share-based payments expense 2024 2023 2024 2023
Stock options (note 20(a)) $ 316 $ 298 $ 915 $ 1,018
Restricted share units (note 20(b)) 354 307 987 858
Deferred share units (note 20(c)) 731 550
Performance share units (note 20(d)) 42 51 333 143
Share based payments expense $ 712 $ 656 $ 2,966 $ 2,569
Page 18

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(a) Stock options

Stock options granted by the Company have a five-year life, with one third each vesting one, two, and three years after grant date.

Nine months ended September 30
2024 2023
Stock options outstanding Number Weighted<br> average<br> exercise price Number Weighted<br> average<br> exercise price
Outstanding, January 1 5,523,297 C$ 4.93 9,178,889 C$ 3.71
Granted 651,955 5.13 457,260 6.57
Exercised (1,406,407 ) 2.64 (3,222,960 ) 1.55
Expired, forfeited or cancelled (1,091,911 ) 7.86 (246,644 ) 14.39
Outstanding, September 30 3,676,934 C$ 4.97 6,166,545 C$ 4.39
Vested, September 30 2,303,882 C$ 4.62 4,842,167 C$ 4.04

The stock options granted during the nine months ended September 30, 2024 had a grant date fair value of C$1.6 million ($1.2 million) using the Black Scholes option pricing model with the following weighted average assumptions:

· Share<br> price at grant date – C$5.13, expected volatility 50%, expected life - 5 years, risk<br> free interest rate 3.5% and expected dividends – nil.
(b) Restricted share units (“RSUs”)
--- ---

RSUs awarded by the Company typically vest one-third each one, two, and three years after award date.

Nine months ended <br> September 30
Number of RSUs outstanding: 2024 2023
Outstanding, January 1 580,219 443,267
Awarded 409,014 295,429
Vested and settled (139,200 ) (152,203 )
Forfeitures (6,850 )
Outstanding, September 30 843,183 586,493
Page 19

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

Number vesting in the year
Number of RSUs outstanding: Total 2024 2025 2026 2027
Outstanding, September 30, 2023 586,493 335,811 152,193 98,489
Outstanding, September 30, 2024 843,183 478,326 230,047 134,810

Restricted Share Units (“RSUs”) are valued based on the closing price of the Company’s common shares on the trading day immediately prior to award. As at September 30, 2024, all RSU’s outstanding were accounted for as equity-settled.

During the nine months ended September 30, 2024, there were no RSUs settled in cash (nine months ended September 30, 2023 – 94,063 RSUs settled in cash for $0.5 million).

(c) Deferred share units (“DSUs”)

DSUs are awarded by the Company to directors. These DSUs vest immediately but are not settled until the end of the director’s tenure. They may be settled in cash or common shares at the option of the Company. DSUs are valued using the closing price of the Company’s common shares immediately prior to award.

Nine months ended <br> September 30
Number of DSUs outstanding: 2024 2023
Outstanding, January 1 701,927 559,725
Awarded and vested immediately 192,976 117,265
Outstanding, September 30 894,903 676,990
Vested, September 30 894,903 676,990
(d) Performance share units (“PSUs”)
--- ---

In March 2023, the Board of Directors approved a PSU plan for certain officers of the Company. The PSUs cliff vest after three years and are settled in cash. The cash payment upon vesting will be based on the number of PSUs, multiplied by the five-day volume weighted average price of the Company’s shares upon vesting, which is then multiplied by a “performance percentage”. The performance percentage ranges from 0% to 200% based on the Company’s total shareholder return compared to a peer group, consisting of the constituents of the S&P/TSX Global Gold Index.

We recognize share-based compensation expense related to these PSUs over the vesting period. We adjust the amount recognized at each reporting period to reflect changes in quoted market values of the Company and the peer group, the lapsed portion of the vesting period, the number of PSUs expected to vest, and the expected performance percentage.

On March 30, 2024, the Company issued a total of 324,139 PSUs.

Page 20

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

Nine months ended <br> September 30
Number of PSUs outstanding: 2024 2023
Outstanding, January 1 198,737
Awarded during the period 324,139 198,737
Outstanding, September 30 522,876 198,737
Vested, September 30
(e) Bonus shares
--- ---

There are 500,000 common shares which were awarded to the non-executive Chairman of the Company as bonus shares, which vested on June 18, 2020. Although the bonus shares have vested, they will become issuable (1) when the non-executive Chairman ceases to act as a director of the Company, or (2) upon a change of control of the Company.

21. RELATED PARTY TRANSACTIONS

The Company’s related parties include:

Related party Nature of the relationship
Key management personnel Key management personnel<br> are the Chief Executive Officer, the Chief Operating Officer, the Chief Financial Officer, Chief Sustainability Officer, the Senior<br> Vice President Exploration, and members of the Board of Directors of the Company.
(a) Key management personnel
--- ---

Compensation to key management personnel was as follows:

Three months ended <br> September 30 Nine months ended <br> September 30
2024 2023 2024 2023
Salaries and short-term incentives $ 387 $ 387 $ 2,647 $ 3,062
Directors’ fees 149 98 449 265
Share based payments 300 193 1,629 1,510
$ 836 $ 678 $ 4,725 $ 4,837
Page 21

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(b) Transactions

The Company had no other material transactions with related parties other than key management personnel during the three months ended September 30, 2024, and 2023.

(c) Outstanding balances at the reporting date

At September 30, 2024, estimated accrued short term incentive compensation totaled $1.1 million and is included in accrued liabilities (December 31, 2023 – $1.4 million).

22. SUPPLEMENTAL CASH FLOW INFORMATION
(a) Cash and cash equivalents
--- ---

Cash and cash equivalents consists of bank current accounts and cash on hand.

(b) Changes in non-cash working capital
Three months ended <br> September 30 Nine months ended <br> September 30
--- --- --- --- --- --- --- --- --- --- --- --- ---
2024 2023 2024 2023
Accounts receivable and prepaid expenses $ (2,193 ) $ (942 ) $ (2,318 ) $ (2,489 )
Inventory 447 (1,067 ) 980 (5,029 )
Valued added taxes recoverable (1,116 ) 572 2,721 3,349
Trade payables and accrued liabilities 3,574 4,666 1,579 3,416
Changes in non-cash working capital $ 712 $ 3,229 $ 2,962 $ (753 )
Page 22

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(c) Non-cash investing and financing activities
Three months ended <br> September 30 Nine months ended <br> September 30
--- --- --- --- --- --- --- --- --- ---
2024 2023 2024 2023
Financing activities
Stock options exercised, credited to share capital with an offset to reserves $ 261 $ 506 $ 985 $ 1,787
Warrants exercised, credited to share capital with an offset to reserves 226 113 539 343
Common shares issued on maturity of RSUs, credited to share capital with an offset to reserves 623 228
Investing activities
Initial recognition of right of use assets,with an offset to lease obligation 1,201 533 1,201 533
Marketable securities adjustment included in account receivable (3 )
23. SEGMENT INFORMATION
--- ---
(a) Reportable segments
--- ---

The operating and reportable segments of the Company are based on the reports which are reviewed by the chief operating decision maker (“CODM”) in making strategic resource allocation decisions. These operating segments are (1) the Camino Rojo Mine, (2) the Nevada projects, (3) the Cerro Quema project and (4) the corporate office. The operating segments other than corporate office are each managed by a dedicated General Manager and management team. The corporate office oversees the plans and activities of early-stage exploration projects.

Page 23

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(b) Geographic segments

We conduct our activities in four geographic areas: Mexico, Nevada USA, Panama, and Canada (Corporate).

(i) Income (loss) for the period by segment
Nine months ended September 30, 2024 Mexico Nevada Panama Corporate Total
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Revenue (note 4) $ 251,155 $ $ $ $ 251,155
Cost of sales (93,345 ) (93,345 )
Earnings from mining operations 157,810 157,810
General and administrative expenses (note 7) (174 ) (11,591 ) (11,765 )
Exploration and evaluation expenses (note 6) (5,941 ) (14,802 ) (4,003 ) (300 ) (25,046 )
Interest income 8,004 1,032 9,036
Depreciation (58 ) (112 ) (204 ) (374 )
Share based payments (note 20) (110 ) (259 ) (70 ) (2,527 ) (2,966 )
Interest and accretion expense (415 ) (462 ) (5,011 ) (5,888 )
Foreign exchange and other gain (loss) 4,391 909 5,300
Income taxes (62,386 ) (827 ) (63,213 )
Income (loss) for the period $ 101,295 $ (15,635 ) $ (4,247 ) $ (18,519 ) $ 62,894
Nine months ended September 30, 2023 Mexico Nevada Panama Corporate Total
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Revenue (note 4) $ 170,505 $ $ $ 192 $ 170,697
Cost of sales (65,708 ) (69 ) (65,777 )
Earnings from mining operations 104,797 123 104,920
General and administrative expenses (note 7) (9,495 ) (9,495 )
Exploration and evaluation expenses (note 6) (6,636 ) (13,358 ) (4,899 ) (407 ) (25,300 )
Interest income 3,001 803 3,804
Depreciation (42 ) (101 ) (12 ) (200 ) (355 )
Share based payments (note 20) (124 ) (246 ) (63 ) (2,136 ) (2,569 )
Interest and accretion expense (1,313 ) (641 ) (7,431 ) (9,385 )
Loss on extinguishment of credit facility (1,547 ) (1,547 )
Foreign exchange and other gain (loss) (787 ) (48 ) (835 )
Income taxes (26,530 ) (1,276 ) (27,806 )
Income (loss) for the period $ 72,366 $ (14,346 ) $ (4,974 ) $ (21,614 ) $ 31,432
Page 24

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(ii) Assets by segment
At September 30, 2024 Mexico Nevada Panama Corporate Total
--- --- --- --- --- --- --- --- --- --- ---
Property, plant and equipment $ 203,851 $ 522 $ $ 661 $ 205,034
Exploration and evaluation properties $ 172,168 $ 10,000 $ 182,168
Total assets $ 402,307 $ 172,146 $ 10,848 $ 33,396 $ 618,697
At December 31, 2023 Mexico Nevada Panama Corporate Total
--- --- --- --- --- --- --- --- --- --- ---
Property, plant and equipment $ 210,339 $ 525 $ $ 855 $ 211,719
Exploration and evaluation properties 160,000 10,000 170,000
Total assets 336,374 161,137 10,673 27,594 535,778
24. CAPITAL MANAGEMENT
--- ---
(a) Objectives
--- ---

Our objectives when managing capital are to safeguard the Company’s ability to continue as a going concern to pursue the exploration, evaluation, development, and exploitation of our mineral properties and to maintain a flexible capital structure.

We manage our capital structure and adjust it considering changes in economic conditions and the risk characteristics of the underlying assets. To maintain or adjust the Company’s capital structure, we may issue new shares, take on additional debt or repay outstanding debt, or acquire or dispose of assets. We currently do not pay regular dividends.

Our ability to carry out our long-range strategic objectives in future periods depends on our ability to generate positive cash flows from our mining operations and to raise financing from lenders, shareholders, and new investors. We regularly review and consider financing alternatives to fund the Company’s ongoing operational, exploration and development activities.

(b) Investment policy

Our investment policy is to invest the Company’s excess cash in low-risk financial instruments such as demand deposits and savings accounts with major Canadian banks. By using this strategy, the Company preserves its cash resources and can marginally increase these resources with low risk through the yields on these investments. Our financial instruments are exposed to certain financial risks, which include currency risk, credit risk, and liquidity risk.

Page 25

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

25. FINANCIAL INSTRUMENTS
(a) Fair value hierarchy
--- ---

To provide an indication of the reliability of the inputs used in determining fair value, we classify our financial instruments into the three levels prescribed by the accounting standards.

Level 1            The fair value of financial instruments traded in active markets (such as publicly traded equity securities) is based on quoted (unadjusted) market prices as at the reporting date. The quoted market price used for financial assets held by the Company is the closing trading price on the reporting date. Such instruments are included in Level 1.

Level 2            The fair value of financial instruments that are not traded in an active market is determined using valuation techniques. These valuation techniques maximize the use of observable market data where it is available and rely as little as possible on entity specific estimates. If all significant inputs required to fair value an instrument are observable, we include that instrument in Level 2.

Level 3            If one or more of the significant inputs is not based on observable market data, the instrument is included in Level 3.

The carrying value of cash and cash equivalents, trade and other receivables, and restricted cash approximates the fair value due to the short-term nature of the instruments.

The fair value of the Revolving Facility is determined using discounted cash flows based on the expected amounts and timing of the cash flows discounted using a market rate of interest adjusted for appropriate credit risk.

The fair value of the Revolving Facility at September 30, 2024 was estimated at $58.4 million (December 31, 2023 - $88.4 million) using a discount rate of 7.9% (December 31, 2023 – 7.9%).

At September 30, 2024, the carrying values and fair values of our financial instruments by category were as follows:

Fair value
Classification Carrying<br><br> value Level 1 Level 2 Level 3
Financial assets
Cash and cash equivalents FVTPL $ 180,898 $ 180,898 $ $
Accounts receivable FVTPL 69 69
Restricted cash Amortized cost 829 829
$ 181,796 $ 181,796 $ $
Financial liabilities
Lease obligation Amortized cost 2,603 2,603
Revolving Facility Amortized cost 58,350 58,350
$ 60,953 $ $ 2,603 $ 58,350
Page 26

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

At December 31, 2023, the carrying values and fair values of our financial instruments by category were as follows:

Fair value
Classification Carrying<br><br> value Level 1 Level 2 Level 3
Financial assets
Cash and cash equivalents FVTPL $ 96,632 $ 96,632 $ $
Accounts receivable FVTPL 18 18
Restricted cash Amortized cost 1,011 1,011
$ 97,661 $ 97,661 $ $
Financial liabilities
Accrued liabilities Amortized cost 122 122
Lease obligation Amortized cost 2,908 2,908
Revolving Facility Amortized cost 88,350 88,350
$ 91,380 $ 122 $ 2,908 $ 88,350

We determine whether transfers have occurred between levels in the hierarchy by re-assessing categorization at the end of each reporting period.

26. COMMITMENTS AND CONTINGENCIES
(a) Commitments
--- ---

The Company has issued purchase orders for construction, equipment purchases, materials and supplies, and other services at Camino Rojo. At September 30, 2024, these outstanding purchase orders and contracts totaled approximately $2.5 million (December 31, 2023 – $3.7 million), which we expect will be filled within the next 12 months.

The Company is committed to making severance payments totaling approximately $6.9 million (December 31, 2023 – $7.4 million) to certain officers and management in the event of a change in control. As the likelihood of these events occurring is not determinable, this amount is not reflected in these consolidated financial statements.

(b) Discretionary mineral property-related commitments

As is customary in mineral exploration, some of the mineral properties held by the Company as exploration and evaluation assets have annual minimum work commitments and lease payments required to maintain these properties in good standing pursuant to their underlying agreements.

(c) Contingencies

An ecological tax implemented by the state legislature of Zacatecas could have a significant impact on the economics of the Camino Rojo Project. This tax is applied to cubic metres of material extracted during mining, square metres of material impacted by dangerous substances, tonnes of carbon dioxide produced during mining processes, and tonnes of waste stored in landfills. The Company has received assessments related to previous periods in respect of this tax; however, the Company’s view is that the sections of the law pursuant to which these assessments have been issued do not apply to the Company at this time and, accordingly, we have filed the appropriate appeals. We expect this matter will be resolved by judicial process. As the outcome of these events is not determinable, no amounts have been accrued in respect of this tax.

Page 27

ORLA MINING LTD.

Notes to the Condensed Interim Consolidated Financial Statements

Three and nine months ended September 30, 2024 and 2023

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

We may, from time to time, be a party to legal proceedings, which arise in the ordinary course of our business. We are not aware of any pending or threatened litigation that, if resolved against us, would have a material effect on our consolidated financial position, results of operations or cash flows.

27. INCOME TAXES

Tax expense consists of (i) current income tax on taxable income, (ii) 7.5% special mining duty ("SMD") on income subject to SMD, and (iii) withholding taxes attributable to interest charged on intercompany loans to the Mexican operating company, as well as (iv) deferred income tax, and (v) deferred special mining duty.

Three months ended <br> September 30 Nine months ended <br> September 30
2024 2023 2024 2023
Current income tax $ 18,826 $ 8,471 $ 38,960 $ 24,067
Mexican 7.5% Special Mining Duty 5,051 3,280 12,292 9,052
Withholding tax 217 422 827 1,276
Deferred income tax expense (recovery) 2,932 1,184 10,276 (5,268 )
Deferred Mexican 7.5% Special Mining Duty 507 (993 ) 858 (1,321 )
Tax expense $ 27,533 $ 12,364 $ 63,213 $ 27,806
28. EVENTS AFTER THE REPORTING PERIOD
--- ---
(a) Revolving facility principal payment
--- ---

Subsequent to the reporting period, the Company repaid the entire outstanding balance on the Revolving Facility totaling $58.4 million (note 15).

(b) Exercise of warrants

Subsequent to the reporting period, the Company issued common shares pursuant to the exercise of warrants (note 18(b).

Page 28

Exhibit 99.2

Management’s Discussion and Analysis

Three and nine months ended September 30, 2024

Amounts in United States dollars

Page 1
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

TABLE OF CONTENTS

I. OVERVIEW 3
II. Q3 2024 Highlights 4
III. OUTLOOK AND UPCOMING MILESTONES 5
IV. DISCUSSION OF OPERATIONS 6
A. CAMINO ROJO, MEXICO 6
B. SOUTH RAILROAD PROJECT (South Carlin Complex), NEVADA 10
C. OTHER PROJECTS - CERRO QUEMA PROJECT, PANAMA 11
V. NON-GAAP MEASURES 13
VI. SUMMARY OF QUARTERLY RESULTS 17
VII. THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2024 19
VIII. LIQUIDITY 21
IX. RELATED PARTY TRANSACTIONS 22
X. CAPITAL RESOURCES 23
XI. OUTSTANDING SHARE DATA 24
XII. OFF-BALANCE SHEET ARRANGEMENTS 24
XIII. CHANGES IN ACCOUNTING POLICIES INCLUDING INITIAL ADOPTION 24
XIV. CRITICAL ACCOUNTING ESTIMATES 25
XV. FINANCIAL INSTRUMENTS 25
XVI. INTERNAL CONTROL OVER FINANCIAL REPORTING 25
XVII. CAUTIONARY NOTES 27
XVIII. RISKS AND UNCERTAINTIES 30
Page 2
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated
I. OVERVIEW
--- ---

Orla Mining Ltd. is a mineral exploration, development, and production company that trades on the Toronto Stock Exchange under the ticker symbol “OLA” and on the NYSE American under the symbol “ORLA”. The “Company”, “Orla”, “we”, and “our” refer to Orla Mining Ltd. and its subsidiaries unless the context otherwise indicates.

Orla’s corporate strategy is to acquire, explore, develop, and operate mineral properties where our expertise can substantially increase stakeholder value. We have two material gold projects for the purposes of National Instrument 43-101 -Standards of Disclosure for Mineral Projects (“NI 43-101”):

· Camino Rojo, located in Zacatecas State, Mexico, consisting of the Camino Rojo oxide gold mine<br> (the “Camino Rojo Oxide Mine” or “Camino Rojo”), which achieved commercial<br> production effective April 1, 2022, and the Camino Rojo sulphides project (“Camino<br> Rojo Sulphides”); and
· South Railroad (“South Railroad” or the “South Railroad Project”),<br> located in the state of Nevada, United States, consisting of the Dark Star and Pinion deposits<br> and situated within the Company’s prospective South Carlin Complex land package in<br> Nevada.
--- ---

This Management’s Discussion and Analysis (“MD&A”) of the financial condition and results of operations of the Company should be read in conjunction with our condensed interim consolidated financial statements for the three and nine months ended September 30, 2024, and our audited consolidated financial statements for the year ended December 31, 2023, and the related notes thereto. The Cautionary Notes near the end of this document are an important part of this MD&A.

Additional information about our Company, including our most recent consolidated financial statements and Annual Information Form, is available on the Company website at www.orlamining.com, under the Company’s profile on the System for Electronic Document Analysis and Retrieval + (“SEDAR+”) at www.sedarplus.ca, and the Company’s documents filed with, or furnished to, the United States Securities and Exchange Commission (“SEC”), which are available through the SEC’s Electronic Data Gathering and Retrieval System (“EDGAR”) at www.sec.gov.

This MD&A is current as of November 12, 2024.

Andrew Cormier, P.Eng., the Chief Operating Officer of the Company, is a Qualified Person, as the term is defined in NI 43-101, and has reviewed and approved the technical information disclosed in this MD&A.

Page 3
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated
II. Q3 2024 Highlights
--- ---
· Third<br> quarter gold production and sales of 43,788 ounces, and 38,265 ounces of gold respectively,<br> generating $99.3 million in revenue.
--- ---
· All-in<br> sustaining cost ^1^ (“AISC”) for the quarter of $720 per ounce of<br> gold sold.
--- ---
· Cash<br> on hand at September 30, 2024 of $180.9 million.
--- ---
· Adjusted<br> earnings ^1^ of $19.2 million, resulting in adjusted earnings per share of $0.06.
--- ---
· Net<br> income of $21.1 million for the quarter, resulting in earnings per share of $0.07.
--- ---
· Cash<br> flow from operating activities before changes in non-cash working capital of $52.0 million.
--- ---
· Exploration<br> and project development costs^1^ of $17.4 million during the quarter, of which $3.7<br> million was capitalized and $13.7 million was expensed.
--- ---
· During<br> Q3, Orla repaid $20.0 million on its revolving credit facility. Subsequent to quarter end,<br> Orla repaid the entirety of the outstanding balance on the Revolving Facility (as defined below) totalling<br> $58.4 million.
--- ---
Operating & Financial Results **** Q3 2024 Q3 2023 YTD 2024 YTD 2023
--- --- --- --- --- --- --- --- --- ---
Gold production ounces 43,788 32,425 110,217 87,393
Gold sold ounces 38,265 31,061 105,186 87,693
Average realized gold price ^1^ per ounce $ 2,477 $ 1,921 $ 2,301 $ 1,929
Cost of sales – operating cost million $ 20.5 $ 16.0 $ 57.1 $ 41.3
Cash cost per ounce ^1^ per ounce $ 482 $ 527 $ 516 $ 496
All-in sustaining cost per ounce ^1^ per ounce $ 720 $ 743 $ 798 $ 712
Revenue million $ 99.3 $ 60.3 $ 251.2 $ 170.7
Net income million $ 21.1 $ 5.4 $ 62.9 $ 31.4
Earnings per share – basic $/share $ 0.07 $ 0.02 $ 0.20 $ 0.10
Adjusted earnings ^1^ million $ 19.2 $ 6.6 $ 59.1 $ 32.0
Adjusted earnings per share - basic ^1^ $/share $ 0.06 $ 0.02 $ 0.19 $ 0.10
Cash flow from operating activities before changes in<br> non-cash working capital million $ 52.0 $ 21.8 $ 126.9 $ 44.1
Free cash flow ^1^ million $ 45.3 $ 18.8 $ 113.3 $ 31.7
Financial position **** September 30 2024 June 30 2024 December 31 2023
--- --- --- --- --- --- --- ---
Cash and cash equivalents million $ 180.9 $ 154.3 $ 96.6
Net cash ^1^ million $ 122.5 $ 76.0 $ 8.3

^1^ Non-GAAP measure. Please referto “Non-GAAP Measures”o f this MD&A for a reconciliation of this measure to our financial statements.

Page 4
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated
III. OUTLOOK AND UPCOMINGMILESTONES
--- ---

We remain focused on advancing the Company’s strategic objectives and near-term milestones, which include the following:

· Maintaining<br> robust health and safety protocols, to support the health of our employees and local communities.
· Maintaining<br> consistent performance at the Camino Rojo Oxide Mine and achieving 2024 improved annual gold<br> production and AISC guidance of 130,000 to 140,000 ounces at $800-$900 per ounce of gold<br> sold.
--- ---
· Continuing<br> to advance project and exploration permitting activities at Camino Rojo and South Railroad.
--- ---
· Continuing<br> our exploration efforts across our portfolio, with focus on several key initiatives, including:
--- ---
o Incorporating the results of the 2023<br> drilling program for the Camino Rojo Sulphides, aimed at informing an underground mineral<br> resource estimate.
--- ---
o Advancing the exploration programs for<br> the Camino Rojo sulphide and oxide extensions, and the South Railroad project, with the goal<br> of increasing reserves and resources.
--- ---
o Conducting regional exploration programs<br> at South Railroad and Camino Rojo to discover new mineral resources.
--- ---
· Advancing<br> our multi-year sustainability strategy “Toward 2030” with sites identifying key<br> performance indicators (“KPIs”) to measure their progress.
--- ---
Page 5
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated
IV. DISCUSSION OF OPERATIONS
--- ---
A. CAMINO<br> ROJO, MEXICO
--- ---

Camino Rojo is a gold-silver-lead-zinc deposit located in the Municipality of Mazapil, State of Zacatecas, Mexico, near the village of San Tiburcio. The project lies 190 kilometres northeast of the city of Zacatecas, 48 km south-southwest of the town of Concepción del Oro, Zacatecas, and 54 kilometres south-southeast of Newmont’s Peñasquito mine.

Refer to the Company’s filed annual information form dated March 19, 2024, for the year ended December 31, 2023 (the “Annual Information Form”), for historical context and project background.

CAMINO ROJO OPERATIONAL UPDATE

The Camino Rojo Oxide Mine achieved quarterly gold production of 43,788 ounces of gold in Q3 2024 at an average ore stacking rate of 18,434 tonnes per day. The average mining rate during the third quarter was 51,982 tonnes per day with a strip ratio of 1.46. The higher strip ratio in the quarter is a result of a mine pit redesign to ensure consistent access to ore to maintain balanced production. The average grade of ore stacked during the third quarter was 0.93 g/t gold, in line with our plan. Gold sold during Q3 2024 totaled 38,265 ounces.

Third quarter cash costs^1^ and AISC^1^totaled $482 and $720 per ounce of gold sold, respectively below our current AISC guidance range of $800 to $900 per ounce of gold sold. Higher than planned silver production and silver price along with higher gold sold during the quarter are the main contributors to the lower AISC in Q3.

Sustaining capital during the third quarter of 2024 totaled $4.1 million. This mainly included the construction of phase 2 of the heap leach pad which was completed in the third quarter.

During the second half of 2023, we initiated a program to test the impact of reduced crushed size from P80 28mm to P80 23mm. As a result, 2024 production has seen an increase of approximately 5% in the realized gold recovery due to the finer crushed size.

^1^ These are non-GAAP measures. Refer to the reconciliationprovided in sectionV of this document.

Page 6
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated
Camino Rojo Operating Highlights **** Q3 2024 Q3 2023 YTD 2024 YTD 2023
--- --- --- --- --- --- --- --- --- ---
Mining - -
Total Ore Mined tonnes 1,942,269 1,840,224 5,790,782 5,575,892
Ore - processed tonnes 1,738,142 1,716,820 5,248,779 5,092,788
Low Grade Ore – stockpiled tonnes 204,127 123,404 542,003 483,104
Waste Mined tonnes 2,840,117 1,087,231 5,764,628 3,358,767
Total Mined tonnes 4,782,386 2,927,455 11,555,410 8,934,659
Strip Ratio waste:ore 1.46 0.59 1.00 0.60
Total Ore Mined Gold Grade g/t 0.88 0.81 0.84 0.76
Ore – processed g/t 0.95 0.85 0.90 0.81
Low Grade Ore – stockpiled g/t 0.30 0.28 0.31 0.29
Processing - -
Ore Crushed tonnes 1,805,535 1,882,139 5,443,305 5,530,933
Ore Stacked tonnes 1,786,175 1,766,828 5,504,158 5,257,878
Stacked Ore Gold Grade g/t 0.93 0.85 0.87 0.81
Gold Produced oz 43,788 32,425 110,217 87,393
Daily Stacking Rate – average tonnes/day 18,434 19,205 19,246 19,260
Q3 2024 Q3 2023 YTD 2024 YTD 2023
--- --- --- --- --- --- --- --- --- ---
Total ROM Ore Stockpile* tonnes 2,793,616 2,600,944 2,793,616 2,600,944
Total ROM Ore Stockpile Grade g/t 0.33 0.33 0.33 0.33

* ROM ore stockpile includes mined ore not yet crushed, and low-gradestockpiles.

ENVIRONMENTAL AND PERMITTING

CHANGE IN LAND USE PERMIT

The Company’s layback agreement with Fresnillo (the “Layback Agreement”) provided the Company with access to the Layback Area. As a result, the project as described in the 2021 technical report titled “Unconstrained Feasibility Study NI 43-101 Technical Report on the Camino Rojo Gold Project, Municipality of Mazapil, Zacatecas, Mexico” dated effective January 11, 2021 (the “2021 Camino Rojo Report”) will require an additional Change of Land Use (in Spanish, Cambio de Uso de Suelo, or “CUS”) permit to allow for additional surface disturbances related to development of a pit layback onto lands not considered in the August 2019 CUS permit application. The application for the additional CUS permit was submitted to SEMARNAT in February 2023. In July 2023, the permit was not approved for procedural reasons due to SEMARNAT’s internal process timelines. We expect to resubmit the additional CUS permit application in Q4 2024.

ENVIRONMENTAL IMPACT STATEMENT

With respect to the Environmental Impact Statement (in Spanish, Manifesto de Impacto Ambiental, or “MIA”), the project described in the 2021 Camino Rojo Report requires a modification of the MIA permit to allow for the additional production related to the development of a pit layback onto lands not considered in the August 2019 permit application, which modification the Company submitted. In March 2022, the Company submitted a second modification of the MIA permit to allow for the open pit east-west expansion, as well as waste and low-grade ore stockpiles. In 2024, both MIA modifications were not approved by SEMARNAT. The Company has completed and submitted the permit application in November, addressing SEMARNAT’s observations to support and obtain the necessary permits or permit amendments and does not expect these delays to have an impact on our 2024 production guidance.

Page 7
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

EXPLORATION

The Camino Rojo land package is under-explored and its proximity to the large Camino Rojo mineralized system provides highly prospective exploration opportunities. Exploration on the project is somewhat challenging due to the presence of a thin alluvial soil and caliche cover restricting geochemical surface expressions, but the potential to discover mineralization is considered excellent. As such, we continue to conduct regional exploration at Camino Rojo.

CAMINO ROJO SULPHIDES

Historical drilling on the Camino Rojo Sulphides, conducted by the previous project owners, indicated the gold grade of the deposit to be widely disseminated and a large, open-pit mining scenario was the favored development pathway. A lower grade open pit development scenario would necessitate higher capital expenditures for a large processing facility, and extensive material handling. To understand if an alternative, more targeted, development approach was possible, the presence of higher grades had to be confirmed. It was interpreted that portions of the deposit were comprised of higher-grade steep northwest dipping vein sets. To test for the higher grades and to confirm the geological model, Orla began drilling into the Camino Rojo Sulphides in the opposite (south) orientation of historical drilling. Between Q4 2020 and year-end 2023, three phases of drilling were completed with the results indicating the presence of continuous, higher-grade gold domains (>2g/t Au) which could be amenable to underground mining, allowing for a smaller processing facility and less material handling.

Over these three distinct campaigns covering a total of 50,924 drill metres, the Camino Rojo Sulphide infill drill program has consistently yielded impressive results. These results include numerous intercepts of greater than 2.0 grams of gold per tonne (g/t Au) over tens of metres (core length), resulting in grade-by-thickness factors exceeding 50 g/t gold per metre. The results also showed narrower intervals of 0.5 to 11.5 metres of gold intersections exceeding 10 g/t Au. Full drill results are available at www.orlamining.com.

Combining Orla's drill holes, oriented from north to south, and historical drill holes oriented in the opposite direction, has decreased drill spacing to approximately 25-30 metres within the higher grade of the Camino Rojo Sulphides. The combined drilling has significantly improved the understanding of the primary controls on gold mineralization. This approach has also contributed to refining the geometry and size of higher-grade zones within the extensive mineralized envelope of the sulphide deposit.

For additional details, please see the Company’s news releases dated January 25, 2024 (“Orla Mining Provides an Update on Infill Drilling at Camino Rojo Sulphides Deposit with Multiple Highly Positive Drill Intersections”), February 7, 2024 (“Orla Mining Concludes 2023 Camino Rojo Sulphides Infill Program with Strong Results”) and June 26, 2024 (“Orla Mining Reports Positive Drilling Intersections and Metallurgical Results at Camino Rojo Sulphide Extensions”).

CAMINO ROJO EXTENSIONS

Orla has encountered and confirmed sulphide mineralization extending beyond the established open pit mineral resource boundaries at Camino Rojo. This drilling and mineralization are building on an updated geological model and the success of the previously reported CRSX22-15C hole drilled 200 metres down-plunge from the existing resources.

Page 8
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

The impressive intercepts justified the execution of a drill section in 2023, targeting 450 metres down-plunge from the existing resources, along the dike zone structure. This significant step-out drilling initiative consisted of drilling 2,400 m, targeting the area around the positive historical intercept in hole CR12-366D (15.7 g/t Au, 29.0 g/t Ag, 0.73% Zn, 0.10 % Pb, 0.08% Cu over 4.5 m). Drilling over this section has confirmed the presence of significant polymetallic semi-massive to massive sulphide mineralization, including 4.86 g/t Au, 43.6g/t Ag, 1.27% Zn, 0.44% Pb, 0.09% Cu over 11.7 m, and 10.3 g/t Au, 37.8 g/t Ag, 3.81% Zn, 0.08% Pb, 0.12% Cu over 5.6 m.

Orla completed an initial metallurgical testing program in 2023 using drill core material from holes CRSX22-07 and CRSX22-08C, which intersected polymetallic replacement-style mineralization during the 2022 program. The metallurgical results on material from CRSX-22-07 and CRSX-22-08C were positive with high gold recovery reported in both CIL bottle roll tests between 81-96% and rougher flotation on the CRSX-22-07 material produced a gold concentrate with 85-88% gold recovery. Open-circuit zinc cleaner tests on material from CRSX-22-07 produced a zinc concentrate with zinc grades of 52% and over 85% zinc recovery. These results suggest this new style of mineralization may be amenable to both standard cyanide processing and flotation.

In 2024, the Company plans to complete a 30,000-metre drill program with two objectives: (1) to infill the down-plunge geometry, continuity, and endowment potential of mineralization along the projection of the Dike Zone, and (2) to step out broadly and further assess the larger upside potential of this open mineralized system. The 2024 Camino Rojo Extension drill program began in early January, and at the end of the third quarter, approximately 77% of the planned drilling was completed. Positive drill results received earlier this year confirm polymetallic (Au, Ag, Zn, Pb, Cu) mineralization 500m down plunge of the current mineral resource. Drilling will continue in Q4, testing the down-plunge extension and targeting 1 km down-plunge from the resource limit. Additional material from the 2024 program, including recent intercepts of copper-rich mineralization will be selected and sent for metallurgical testing in Q4 2024 or early 2025. For additional details, please see press release dated February 22, 2024 (“Orla Mining Discovers New Style of Sulphide Mineralization at Camino Rojo Extending 0.5km Beyond Current Resources”), June 22, 2023 (“Orla Mining Provides Update On Successful Drilling Program In Mexico”) and June 26, 2024 (“Orla Mining Reports Positive Drilling Intersections and Metallurgical Results at Camino Rojo Sulphide Extensions”).

OPEN PIT EXTENSION

The 2024 oxide extension program tested shallow oxide mineralization near the southeast pit wall, focusing on structurally controlled areas, with the objective of defining additional oxide gold material and extending the life of the Camino Rojo Oxide mine. The 2024 oxide extension program was completed in March, with total drilling of 2,036 m in 19 drillholes. Assay results from the 2024 oxide extension program indicate gold mineralization in the targeted area is well constrained by the current open pit.

REGIONAL EXPLORATION

In 2024, Orla has initially allocated approximately 13,000 m of drilling to regional exploration efforts with the objective of continuing to drill test priority exploration targets along the northeast-southwest mine trend and northwest-southeast regional trend. Due to permit restrictions, drill permits were received for only three targets, reducing the planned program to approximately 4,000m. Regional drilling began in early July and will test the Lago Azul, Chiquiguitillo, and Catas Sur targets in the second half of the year, with additional drill testing at Hacheros, if permitted. Assay results are pending. In addition to drill testing, target generation activities are ongoing.

SUSTAINABILITY

At the end of Q3 2024, 100% of Camino Rojo’s direct employees were Mexican nationals. The Company and its contractors employ 89% of the employable workforce available from local communities.

Page 9
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

The Company maintains and regularly updates its community, social relations, and environmental management program. We participate in quarterly community water monitoring and other environmental-related activities. The Sustainability Risk Committee, which is comprised of members of the Company and community relations advisors, continues to hold monthly meetings. Our community relations team continues to work with local communities to understand how the Company can best provide support.

· During<br> the third quarter of 2024, our team at Camino Rojo continued its community investment program<br> focusing on water collection and storage systems, water wells, community meeting centers,<br> rural roads maintenance, and urban beautification. In conjunction with the Zacatecas Institute<br> for Technical Training, the Company started a program for skills development in basic English,<br> pastry preparation, hairdressing, and sewing. Approximately 50 participants enrolled for<br> the certification programs which will also include training on small-scale businesses management.
· Since<br> 2023, Camino Rojo has been collaborating with the EMSAD high school in San Tiburcio, private<br> partners Sodexo and Murlota, and the Government of Zacatecas to develop an innovative community<br> project for economic development and agricultural education by launching a poultry farm.<br> This initiative aims to achieve self-sufficiency in egg production, generate surpluses for<br> local, state, and national markets, and increase family income for all participants. It also<br> promotes small-scale egg production, improves access to fresh, local foods, and strengthens<br> food security in the region. The farm involves both high school students and community members<br> who gain hands-on experience in poultry farming, equipping them with essential skills and<br> entrepreneurial insights. This project has a positive economic impact on local communities<br> and also promotes animal welfare and sustainable, eco-friendly production.
--- ---
B. SOUTH<br> RAILROAD PROJECT (South Carlin Complex), NEVADA
--- ---

In August 2022, the Company acquired the South Railroad Project, which is located along the Pinon mountain range, approximately 24 kilometers south-southeast of Carlin, Nevada, in the Railroad mining district. South Railroad is part on the Company’s South Carlin Complex, a prospective 25,000-hectare land package. Refer to the Annual Information Form for historical context and project background.

ENVIRONMENT AND PERMITTING

PERMITTING ACTIVITIES

The South Railroad Project, situated on federal land, is currently advancing under the guidance of the US Bureau of Land Management (“BLM”) in accordance with the National Environmental Policy Act (“NEPA”) for permitting. Orla is finalizing 20 Supplemental Environmental Reports (“SERs”) required by the BLM prior to issuing a Notice of Intent (“NOI”). To date, 15 reports have been reviewed by the BLM and cooperating agencies, and Orla’s consultants are completing the final five with feedback incorporated. The Company aims to finalize all SERs by the end of 2024.

The NOI is expected to be published in early 2025, with the Company targeting a Record of Decision (final permitting decision) by mid-2026. Following this approval, construction on the South Railroad Project would commence, with first gold production anticipated in 2027.

At the state level, the Company has received Class I and II Air Operating Permits. Applications have been prepared for the Water Pollution Control Permit and the National Pollutant Discharge Elimination System (“NPDES”) discharge permit, which will be submitted after the NOI in 2025.

Page 10
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

DETAILED DESIGN WORK AND AWARDING OF THE EPCM CONTRACT

The Engineering, Procurement, and Construction Management (“EPCM”) contract is set to be awarded later this year. Basic and detailed engineering will proceed in 2025 and 2026 to align with construction following the Record of Decision. Long-lead equipment will be identified, with purchase orders potentially beginning in 2025.

EXPLORATION

The South Railroad Project is a prospective land package for the discovery of additional Carlin- and associated low sulfidation-type gold mineralization outside the already defined gold resources and reserves at the Pinion and Dark Star deposits. The potential for definition of additional oxide resources is considered very good. As such, we continue to conduct near-deposit and regional exploration at the South Railroad Project.

Orla’s 2024 exploration program at South Railroad includes approximately 20,000 m of exploration drilling, including drilling planned on the recently acquired Pony Creek property. Drilling activities started in late Q2 2024. At the end of Q3, approximately 74% of the planned drill program was complete.

Exploration drilling in 2024 began with near-deposit exploration targeting potential extensions of known deposits. Drilling at the Pinion and Dark Star deposits returned significant results indicating potential to expand oxide gold mineralization beyond the projected open pit boundaries and extend the projected life of mine. For additional information please see press release dated October 31, 2024 (“Orla Provides Exploration and Permitting Update at South Railroad Project within the “South Carlin Complex” in Nevada”).

Drill testing of selected regional exploration targets to assess the potential for Carlin-, epithermal- and skarn-type gold and base metal mineralization is expected to be completed in early Q4 and completed assay results expected by late Q4. In the south property area, regional exploration drilling is testing the extensions of known satellite deposits, such as Jasperoid Wash, Stallion, Bowl, and Appaloosa, and north-south trending gold-in-soil anomalies, with strike lengths >5 km, that connect these deposits. Geological and geochemical field work is also being completed to develop and advance early-stage targets to the drill-stage across the >25 km strike length of the property.

ACQUISITION OF CONTACT GOLD CORP.

During the second quarter, on April 29, 2024, the Company acquired all the outstanding common shares of Contact Gold Corp. (“Contact”), a publicly listed company.

The Contact properties acquired consist mainly of the Pony Creek property and the Green Springs property. These properties are all now included within the South Railroad Project for the purposes of financial reporting.

C. OTHER<br> PROJECTS - CERRO QUEMA PROJECT, PANAMA

The Cerro Quema Project is located on the Azuero Peninsula in the Los Santos Province of southwestern Panama, about 45 km southwest of the city of Chitre. The project includes a pre-feasibility-stage, open-pit, heap leach gold project, a copper-gold sulphide resource, and various exploration targets.

On October 27, 2023, Panama’s President signed Executive Decree No. 23/2023 that prohibited the granting of new concessions for the exploration, extraction, transportation, and exploitation of metal mining in Panama. On November 3, 2023, the National Assembly of Panama passed Law 407 that included a moratorium on granting, renewing, or extending concessions for the exploration, extraction, or exploitation of metal mining in Panama. On December 15, 2023, Minera Cerro Quema, S.A., the Company’s subsidiary that holds the Cerro Quema Project, received three resolutions from the Panamanian Ministry of Commerce and Industry. The resolutions rejected the request for extension for the three mining concessions comprising the Cerro Quema Project, retroactively declared the concessions canceled, and declared the area comprising the concessions to be a reserve area under the Panamanian mining code. Under the Panamanian mining code, MICI is prohibited from granting mining concessions for exploration or extraction on a reserve area. As a result of the cancellation of the mining concessions comprising the Cerro Quema Project, we recognized an impairment of the carrying value of the asset of $72.4 million in our financial statements at December 31, 2023.

Page 11
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

In March 2024, the Company filed a Notice of Intent to Arbitrate with the Government of Panama under the Canada-Panama Free Trade Agreement (the “FTA”). The Notice of Intent asserted that the measures taken by Panama, including those described above, constituted violations of Panama’s legal obligations under the FTA and customary international law. The Notice of Intent was intended to facilitate a 30-day consultation period to reach an amicable resolution to the Company’s claim. As no resolution was reached, the Company proceeded with filing a Request to Arbitrate on July 3, 2024. As part of the FTA requirements, the Company submitted an initial and preliminary estimate of damages claimed of no less than US$400 million, plus pre-award and post-award interest.

The arbitration will be facilitated and administered by the International Centre for Settlement of Investment Disputes (ICSID) in Washington, DC, under its Arbitration Rules. As of the date of this MD&A, a tribunal for the arbitration has been constituted in accordance with the Arbitration Rules and a case management conference is scheduled for late November 2024.

Although the Company intends to vigorously pursue these legal remedies, the Company’s preference is a constructive resolution with the Government of Panama that results in a positive outcome for all stakeholders.

Page 12
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

V.            NON-GAAPMEASURES

We have included herein certain performance measures (“non-GAAP measures”) which are not specified, defined, or determined under generally accepted accounting principles (“GAAP”). These non-GAAP measures are common performance measures in the gold mining industry, but because they do not have any mandated standardized definitions, they may not be comparable to similar measures presented by other issuers. Accordingly, we use such measures to provide additional information, and you should not consider them in isolation or as a substitute for measures of performance prepared in accordance with GAAP. In this section, all currency figures in tables are in thousands, except per-share and per-ounce amounts.

AVERAGE REALIZED GOLD PRICE

Average realized gold price per ounce sold is calculated by dividing gold sales proceeds received by the Company for the relevant period by the ounces of gold sold. The Company believes the measure is useful in understanding the gold price realized by the Company throughout the period.

Q3 2024 Q3 2023 YTD 2024 YTD 2023
Revenue $ 99,307 $ 60,294 $ 251,155 $ 170,697
Silver sales (4,516 ) (623 ) (9,082 ) (1,522 )
Gold sales 94,791 59,671 242,073 169,175
Ounces of gold sold 38,265 31,061 105,186 87,693
AVERAGE REALIZED GOLD PRICE $ 2,477 $ 1,921 $ 2,301 $ 1,929

NET CASH

Net cash is calculated as cash and cash equivalents and short-term investments less total debt adjusted for unamortized deferred financing charges at the end of the reporting period. This measure is used by management to measure the Company’s debt leverage. The Company believes that in addition to conventional measures prepared in accordance with IFRS, net cash is useful to evaluate the Company’s leverage and is also a key metric in determining the cost of debt.

September 30,<br> 2024 December 31, <br> 2023
Cash and cash equivalents $ 180,898 $ 96,632
Less: Long term debt (58,350 ) (88,350 )
NET CASH $ 122,548 $ 8,282
Page 13
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

ADJUSTED EARNINGS AND ADJUSTED EARNINGS PER SHARE

Adjusted earnings excludes unrealized foreign exchange, changes in fair values of financial instruments, impairments and reversals due to net realizable values, restructuring and severance, and other items which are significant but not reflective of the underlying operational performance of the Company. We believe these measures are useful to market participants because they are important indicators of the strength of our operations and the performance of our core business.

Q3 2024 Q3 2023 YTD 2024 YTD 2023
Net income for the period $ 21,144 $ 5,370 $ 62,894 $ 31,432
Related to the previous year 517 517
Unrealized foreign exchange (2,074 ) (1,437 ) (4,505 ) (2,143 )
Loss on extinguishment of credit facility 1,547 1,547
Accretion of deferred revenue 122 553 366 553
Share based compensation related to PSUs 42 51 333 143
ADJUSTED EARNINGS $ 19,234 $ 6,601 $ 59,088 $ 32,049
Millions of shares outstanding – basic 320.3 313.8 317.8 310.5
Adjusted earnings per share – basic $ 0.06 $ 0.02 $ 0.19 $ 0.10

Companies may choose to expense or capitalize costs incurred while a project is in the exploration and evaluation phase. Our accounting policy is to expense these exploration costs. To assist readers in comparing against those companies which capitalize their exploration costs, we note that included within Orla’s net income for each period are exploration costs which were expensed, as follows:

Q3 2024 Q3 2023 YTD 2024 YTD 2023
Exploration & evaluation expense $ 13,653 $ 11,233 $ 25,046 $ 25,300

FREE CASH FLOW

Free Cash Flow is calculated as the sum of cash flow from operating activities and cash flow from investing activities, excluding certain unusual transactions. The Company believes market participants use Free Cash Flow to evaluate the Company’s operating cash flow capacity to meet non-discretionary outflows of cash. Free Cash Flow is not meant to be a substitute for the cash flow information presented in accordance with IFRS.

Q3 2024 Q3 2023 YTD 2024 YTD 2023
Cash flow from operating activities $ 52,699 $ 25,019 $ 129,818 $ 43,393
Cash flow from investing activities (7,387 ) (6,230 ) (16,517 ) (11,666 )
FREE CASH FLOW $ 45,312 $ 18,789 $ 113,301 $ 31,727
Millions of shares outstanding – basic 320.3 313.8 317.8 310.5
Free cash flow per share – basic $ 0.14 $ 0.06 $ 0.36 $ 0.10
Page 14
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

CASH COST AND ALL-IN SUSTAINING COST

Cash cost per ounce is calculated by dividing the sum of operating costs and royalty costs, net of by-product silver credits, by ounces of gold sold. Management believes that this measure is useful to market participants in assessing operating performance.

The Company has provided an All-in SustainingCost performance measure that reflects all the expenditures that are required to produce an ounce of gold from operations. While there is no standardized meaning of the measure across the industry, the Company's definition conforms to the all-in sustaining cost definition as set out by the World Gold Council in its guidance dated November 14, 2018. Orla believes that this measure is useful to market participants in assessing operating performance and the Company's ability to generate free cash flow from current operations.

Q3 2024 Q3 2023 YTD 2024 YTD 2023
Cost of sales – operating costs $ 20,509 $ 16,039 $ 57,142 $ 41,289
Related to the previous year (517 ) (517 )
Royalties 2,466 1,479 6,232 4,233
Silver sales (4,516 ) (623 ) (9,082 ) (1,522 )
CASH COST $ 18,459 $ 16,378 $ 54,292 $ 43,483
Ounces of gold sold 38,265 31,061 105,186 87,693
Cash cost per ounce sold 482 527 516 496
Q3 2024 Q3 2023 YTD 2024 YTD 2023
--- --- --- --- --- --- --- --- ---
Cash cost, as above $ 18,459 $ 16,378 $ 54,292 $ 43,483
General and administrative expenses 4,018 3,123 11,765 9,495
Share based payments 591 534 2,637 2,260
Accretion of site closure provisions 121 137 364 394
Amortization of site closure provisions 139 128 392 388
Sustaining capital 4,059 1,757 13,428 4,345
Sustaining capitalized exploration expenses 1 780 542 1,476
Lease payments 164 247 538 606
ALL-IN SUSTAINING COST $ 27,552 $ 23,084 $ 83,958 $ 62,447
Ounces of gold sold 38,265 31,061 105,186 87,693
All-in sustaining cost per ounce sold 720 743 798 712
Page 15
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

EXPLORATION AND PROJECT DEVELOPMENT COSTS

Exploration and project developmentcosts are calculated as the sum of these costs, some of which have been expensed and some of which have been capitalized. The Company believes this measure provides a more fulsome understanding to readers of the level of expenditures incurred on such activities during the period.

Q3 2024 Q3 2023 YTD 2024 YTD 2023
Exploration and evaluation expense $ 13,653 $ 11,233 $ 25,046 $ 25,300
Expenditures on mineral properties capitalized 3,710 4,560 10,689 9,433
EXPLORATION AND PROJECT DEVELOPMENT $ 17,363 $ 15,793 $ 35,735 $ 34,733
Page 16
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

VI.          SUMMARYOF QUARTERLY RESULTS

Production and sales of gold during each of the last eight quarters was as follows:

Q3 2024 Q2 2024 Q1 2024 Q4 2023 Q3 2023 Q2 2023 Q1 2023 Q4 2022
Ounces gold produced 43,788 33,206 33,223 34,484 32,425 29,058 25,910 32,017
Ounces gold sold 38,265 34,875 32,046 31,300 31,061 29,773 26,859 32,438

The figures in the following table are based on the unaudited consolidated financial statements of the Company which were prepared in accordance with IFRS.

$ thousands Q3 2024 Q2 2024 Q1 2024 Q4 2023 Q3 2023 Q2 2023 Q1 2023 Q4 2022
Revenue $ 99,307 $ 84,570 $ 67,278 $ 62,946 $ 60,294 $ 59,272 $ 51,131 $ 56,758
Cost of sales (34,572 ) (30,197 ) (28,576 ) (26,339 ) (25,092 ) (21,733 ) (18,952 ) (18,572 )
Operating margin 64,735 54,373 38,702 36,607 35,202 37,539 32,179 38,186
Exploration expense (13,653 ) (6,649 ) (4,744 ) (9,316 ) (11,233 ) (7,201 ) (6,866 ) (5,605 )
Office and administrative (1,033 ) (875 ) (831 ) (1,079 ) (929 ) (834 ) (710 ) (805 )
Professional fees (1,159 ) (1,028 ) (787 ) (1,255 ) (550 ) (516 ) (397 ) (555 )
Regulatory and transfer agent (43 ) (49 ) (277 ) (18 ) (37 ) (110 ) (286 ) (17 )
Salaries and wages (1,783 ) (1,926 ) (1,974 ) (1,561 ) (1,607 ) (1,647 ) (1,872 ) (1,364 )
Depreciation (121 ) (126 ) (127 ) (149 ) (117 ) (120 ) (118 ) (115 )
Share based payments (712 ) (835 ) (1,419 ) (652 ) (656 ) (806 ) (1,107 ) (526 )
Foreign exchange and other 2,276 2,080 944 (608 ) (340 ) (1,240 ) (802 ) (1,856 )
Impairment of exploration properties (72,743 )
Interest and finance costs 170 3,648 (670 ) (870 ) (1,999 ) (1,466 ) (2,116 ) (2,018 )
Tax expense (27,533 ) (24,348 ) (11,332 ) (6,798 ) (12,364 ) (10,772 ) (4,670 ) (6,635 )
Net income (loss) $ 21,144 $ 24,265 $ 17,485 $ (58,442 ) $ 5,370 $ 12,827 $ 13,235 $ 18,690
Net income (loss) per share (basic) $ 0.07 $ 0.08 $ 0.06 $ (0.19 ) $ 0.02 $ 0.04 $ 0.04 $ 0.06
Net income (loss) per share (diluted) $ 0.06 $ 0.07 $ 0.05 $ (0.19 ) $ 0.02 $ 0.04 $ 0.04 $ 0.06

REVENUE AND COST OF SALES

Revenue is driven by ounces sold. Over the period Q4 2022 to Q3 2024, gold sales have increased steadily from about 32,000 ounces per quarter to about 38,000 ounces per quarter, while realized price has increased from about US$1,740 per oz to over US$2,400 per oz.

Cost of sales has increased over time as a result of higher ounces sold, higher reagent consumption due to higher lifts on the leach pad, increased labour rates due to a collective agreement, and a general strengthening of the Mexican peso against the US dollar, although we did see it weaken commencing in Q2 2024. Increases in the depreciation component of cost of sales are due to ongoing capital expenditures and higher corresponding ounces sold.

EXPLORATION EXPENSE

In Q3 2022, we acquired the South Railroad Project and continued significant exploration and evaluation activities at South Railroad. This has caused increases in exploration expense after Q2 2022. We also continued further exploration activities at Camino Rojo and Cerro Quema during 2022 and into 2023. Commencing Q1 2024 we limited our costs at Cerro Quema to, primarily, holding costs.

Page 17
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

ADMINISTRATIVE COSTS

Administrative costs and professional fees have trended with the level of activity of the Company and have trended upwards generally as a result of (a) implementing Sarbanes Oxley requirements (which have resulted in increased staffing, dedicated software, and increased audit and related advisory fees), and (b) increased staffing and costs related to our ESG activities.

SHARE BASED PAYMENTS

Share-based payments expense is generally related to the number of stock options, restricted share units (“RSUs”), deferred share units (“DSUs”), and PSUs vesting during the quarter. The grants typically occur during the first quarter of each year; consequently, those quarters tend to be greater than the others.

INTEREST AND FINANCE COSTS

Interest and financing costs are primarily related to (a) the project loan and credit facilities used to fund the construction of the Camino Rojo Oxide Mine, and (b) the obligations arising from our acquisition of the Layback Area from Fresnillo.

We repaid the Fresnillo obligations in Q4 2023 and have made significant principal payments against our credit facilities from Q3 2023 to Q3 2024. We repaid the entire Revolving Facility shortly after the end of Q3 2024. Consequently, interest and finance costs have trended lower over the past few quarters.

FOREIGN EXCHANGE

We funded the construction of the Camino Rojo Oxide Mine by funding US-dollar-denominated loans from the Canadian parent company to our Mexican operating subsidiary. The intercompany loan balance at September 30, 2024 was approximately US$73 million (June 30, 2024 - $102 million), and since the Canadian parent is Canadian-dollar functional, this leads to foreign exchange gains or losses arising from changes in the USD-CAD exchange rate. Our Mexican operating subsidiary is US-dollar functional; consequently, no offsetting foreign exchange was recorded. This has been the single largest contributor to volatility in our foreign exchange.

TAX EXPENSE

We accrue income taxes and record deferred taxes each quarter. In common with all other mining companies operating in Mexico, the Company is subject to a 7.5% Special Mining Duty (“SMD”) on earnings from mining operations, in addition to corporate income tax.

IMPAIRMENT EXPENSE

During Q4 2023, we recorded an impairment charge against our investment in the Cerro Quema Project in Panama.

Page 18
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated
VII. THREE AND NINE MONTHSENDED SEPTEMBER 30, 2024
--- ---

The following commentaries are based on accompanying (i) unaudited condensed interim consolidated financial statements for the three and nine months ended September 30, 2024, and (ii) audited consolidated financial statements for the year ended December 31, 2023, each of which were prepared in accordance with IFRS.

BALANCE SHEET

Comparison of balance sheets at September 30, 2024 to December 31, 2023.

Sep 30,<br> 2024 Dec 31,<br> 2023 Commentary
Cash $ 180,898 $ 96,632 Significant inflows are from operating earnings and non-cash working capital, partly offset by tax payments, purchases of PP&E and capitalized exploration and payment of principal and interest on our revolving facility.
Other current assets 42,590 48,543 Primarily due to collection of Mexican value added taxes recoverable.
Property, plant and equipment 205,034 211,719 Decrease was primarily due to depletion and depreciation partly offset by net additions.
Exploration and evaluation properties 182,168 170,000 Acquisition of Contact Gold in Q2 2024.
Other long term assets 8,007 8,884
Current liabilities 49,259 28,658 Increase is driven by the accrual of income taxes and increases in routine accrued expenses due to timing of payments.
Long term debt 58,350 88,350 Repayments on our Revolving Facility during the year.
Other long term liabilities 30,355 18,229 Consists of (i) increase in deferred tax liabilities arising primarily from the weakening of the Mexican peso against the US dollar, and (ii) increases in site closure provisions and (3) accretion of both the site closure provisions and of deferred revenue.
Page 19
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

INCOME FOR THE QUARTER

Q3 2024 Q3 2023 Commentary
Revenue $ 99,307 $ 60,294 More ounces sold, at a higher realized price.
Cost of sales 34,572 25,092 More ounces sold, and increase in unit costs for reagents and labour.
General and administrative 4,018 3,123 Increased costs primarily due to Sarbanes Oxley internal control reporting requirements.
Exploration and evaluation 13,653 11,233 Increased holding costs at Cerro Quema and increased drilling activity at Nevada.
Other expenses (income) (1,613 ) 3,112 Driven by FX gains due to a weakening of the peso and lower interest expense on the credit facility.  Q3 2023 also included a loss on extinguishment of the credit facility.
Income taxes 27,533 12,364 Increase in Q3 2024 is driven primarily by increased operating profit.  Weakening of the peso caused an increase in deferred tax expense for Q3 2024.
Net income $ 21,144 $ 5,370
YTD 2024 YTD 2023 Commentary
--- --- --- --- --- --- ---
Revenue $ 251,155 $ 170,697 More ounces sold, at a higher realized price.
Cost of sales 93,345 65,777 More ounces sold, increase in unit costs for reagents and labour.
General and administrative 11,765 9,495 Costs associated with implementation of Sarbanes Oxley internal control reporting requirements.
Exploration and evaluation 25,046 25,300
Other expenses (income) (5,108 ) 10,887 Driven by the receipt of interest on a large outstanding VAT refund and FX gains.
Income taxes 63,213 27,806 Increased operating profit leading to increase current income taxes, and a weakening peso leading to an increase in deferred income taxes.
Net income $ 62,894 $ 31,432
Page 20
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

CASH FLOWS

Nine months ended<br> September 30
2024 2023 Commentary
Cash flow from operating activities $ 129,818 $ 43,393 The increase is driven substantially by the increase in earnings from mining operations.
Cash flow from investing activities (16,517 ) (11,666 ) The 2024 year to date includes greater expenditures on capital equipment, capitalized expenditures on mineral properties, and costs incurred for the Contact Gold acquisition, offset by a large VAT refund, which did not occur in the prior year comparative figure.
Cash flow from financing activities (28,637 ) 4,693 The 2024 year to date includes voluntary principal repayments totaling $30.0 million, and lower interest on our credit facilities. <br>The 2023 year to date included $18.4 million from the issuance of common shares partially offset by a principal payment of $11.1 million, and higher interest on our credit facilities.
VIII. LIQUIDITY
--- ---

At September 30, 2024, the Company had a Revolving Facility (as defined below) loan balance outstanding of $58 million with a maturity date of August 27, 2027. Subsequent to the quarter end, we repaid the entirety of the outstanding balance on the Revolving Facility totaling $58 million. As of the date of this MD&A, the Company has no amounts outstanding under the Revolving Facility.

EXPECTED SOURCES OF CASH

We expect to fund the operating costs and the operating and strategic objectives of the Company over the next twelve months with existing cash on hand and metal sales, although we may also receive proceeds from exercises of options and warrants over that time.

Page 21
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

CONTRACTUAL OBLIGATIONS

Contractual obligations Payments due by period
As at September 30, 2024<br> (thousands of US dollars) Total 12 months or<br><br> less 13 months to<br><br> 36 months 37 months to<br><br> 60 months After 60 <br><br>months
Purchase commitments $ 2,514 $ 2,514 $ $ $
Trade payables 10,821 10,821
Accrued liabilities 12,415 12,415
Lease commitments 2,845 1,386 1,459
Revolving Facility 58,350 58,350
Total contractual obligations $ 86,945 $ 27,136 $ 59,809 $ $
IX. RELATED PARTY TRANSACTIONS
--- ---

The Company’s related parties include “key management personnel”, whom we define as the Chief Executive Officer, the Chief Operating Officer, the Chief Financial Officer, the Chief Sustainability Officer, the Senior Vice President Exploration, and members of the Board of Directors of the Company.

Other than compensation in the form of salaries or directors’ fees, and share based payments (options, RSUs, DSUs, PSUs, and bonus shares), there were no other material transactions with this group of individuals.

Compensation to key management personnel was as follows:

YTD 2024 YTD 2023
Salaries and short term incentive plans $ 2,647 $ 3,062
Directors’ fees 449 265
Share based payments 1,629 1,510
$ 4,725 $ 4,837

During the period covered by this MD&A, and to the date of this MD&A, there are no other related party transactions or balances.

Page 22
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated
X. CAPITAL RESOURCES
--- ---

REVOLVING FACILITY

The Company has available to it a $150 million revolving credit facility (the “Revolving Facility”) with full repayment due upon maturity on August 27, 2027. The applicable interest rate for the Revolving Facility is based on the term Secured Overnight Financing Rate (“SOFR”), plus an applicable margin based on the Company’s leverage ratio at the end of each fiscal quarter. The undrawn portion of the Revolving Facility is subject to a standby fee. Interest is payable at the end of each interest period, or at least every three months. The Company may prepay all or any portion of the amounts owed under the Revolving Facility without penalty.

As at September 30, 2024, the end of the reporting period, the outstanding balance of the Revolving Facility was $58.4 million. Subsequent to the reporting period, the Company repaid the entirety of the outstanding balance on the Revolving Facility. As of the date of this MD&A, no amounts are outstanding in respect of this Revolving Facility. The Revolving Facility remains in place and is available to the Company until maturity on August 27, 2027.

The Revolving Facility can be increased to $200 million, subject to receipt of additional binding commitments and satisfaction of certain conditions precedent.

Refer to section VIII - LIQUIDITY above for current outstanding amounts in respect of the Revolving Facility, and the notes in the accompanying audited consolidated financial statements for details on payments and accruals during the year.

EQUITY

The Company filed a base shelf prospectus on April 13, 2023, which is valid for 25 months.

As of September 30, 2024, there were 25.5 million warrants outstanding which have an exercise price of C$3.00 which is less than the current market value of the underlying shares. There are also warrants of Contact outstanding which are exercisable into a total of 315,000 Orla common shares at an adjusted price of approximately $7.94 per common share. There have been no material changes in the number of warrants outstanding since the end of the reporting period to the date of this MD&A.

Page 23
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated
XI. OUTSTANDING SHAREDATA
--- ---

As of the date of this MD&A, the Company had the following equity securities outstanding:

· 321,553,703<br> common shares
· 25,540,000<br> warrants
--- ---
· 3,672,278<br> stock options
--- ---
· 500,000<br> bonus shares
--- ---
· 843,183<br> restricted share units
--- ---
· 894,903<br> deferred share units
--- ---
· 50,000,000<br> warrants of Contact, exercisable for 315,000 common shares
--- ---

Further details about these potentially issuable securities are provided in the notes to the accompanying unaudited condensed interim consolidated financial statements for the three and nine months ended September 30, 2024 and in the audited consolidated financial statements as at and for the year ended December 31, 2023.

XII. OFF-BALANCE SHEETARRANGEMENTS

We have no off-balance sheet arrangements requiring disclosure under this section.

XIII. CHANGES IN ACCOUNTINGPOLICIES INCLUDING INITIAL ADOPTION

IFRS 18, Presentation and Disclosure in Financial Statements

In April 2024, the IASB issued a new IFRS 18 “Presentation and Disclosure in Financial Statements” replacing IAS 1. The new guidance is expected to improve the usefulness of information presented and disclosed in the financial statements of companies. IFRS 18 introduces the following key changes:

· IFRS<br> 18 introduces a defined structure for the statement of income (loss) composed of operating,<br> investing, financing categories with defined subtotals, such as operating earnings (loss),<br> earnings (loss) before financing and income taxes and net earnings (loss) for the year. The<br> new guidance also requires disclosure of expenses in the operating category by nature, function<br> or a mix of both on the face of the statement of income (loss).
· Disclosures<br> on management defined performance measures (“MPMs”) - IFRS 18 requires companies<br> to disclose definitions of company-specific MPMs that are related to the statement of income<br> (loss) and provide reconciliations between the MPMs and the most similar specified subtotals<br> within the statement of income (loss) in a single note.
--- ---
· Aggregation<br> and disaggregation (impacting all primary financial statements and notes) - IFRS 18 sets<br> out enhanced guidance on the principles of how items should be aggregated based on shared<br> characteristics. The changes are expected to provide more detailed and useful information<br> to investors.
--- ---

IFRS 18 is effective for annual reporting periods beginning on or after January 1, 2027, with early adoption permitted. We are currently assessing the impact of this new IFRS accounting standard on our consolidated financial statements.

Page 24
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated
XIV. CRITICAL ACCOUNTINGESTIMATES
--- ---

In preparing the accompanying unaudited condensed interim consolidated financial statements, we have made judgements, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets, liabilities, income, and expenses. Actual results may differ from these estimates.

We review estimates and their underlying assumptions on an ongoing basis. Revisions to estimates are recognized prospectively.

Judgements, estimates, and assumptions that we have made in applying accounting policies that have the most significant effects on the amounts recognized in our consolidated financial statements are presented in our MD&A for the year ended December 31, 2023. We have no material updates.

XV. FINANCIAL INSTRUMENTS

In the normal course of business, the Company is inherently exposed to certain financial risks, including market risk, credit risk, and liquidity risk, through its use of financial instruments. The timeframe and the way we manage these risks varies based upon our assessment of these risks and available alternatives for mitigation.

We do not ordinarily acquire or issue derivative financial instruments for trading or speculative purposes. All transactions undertaken are to support our operations.

XVI. INTERNAL CONTROLOVER FINANCIAL REPORTING

DISCLOSURE CONTROLS AND PROCEDURES

Disclosure controls and procedures are designed to provide reasonable assurance that information required to be disclosed in reports filed or submitted by the Company under U.S. and Canadian securities legislation is recorded, processed, summarized, and reported within the time periods specified in those rules, and include controls and procedures designed to ensure that information required to be disclosed in reports filed or submitted by the Company under U.S. and Canadian securities legislation is accumulated and communicated to management, including the CEO and CFO, as appropriate, to permit timely decisions regarding required disclosure.

Management, including the CEO and CFO, believe that any disclosure controls and procedures or internal controls over financial reporting, no matter how well conceived and operated can provide only reasonable, not absolute, assurance that the objectives of the control system are met. Further, the design of a control system must reflect the fact that there are resource constraints, and the benefits of controls must be considered relative to their costs. Because of the inherent limitations in all control systems, they cannot provide absolute assurance that all control issues and instances of fraud, if any, within the Company have been prevented or detected.

These inherent limitations include the realities that judgements in decision-making can be faulty, and that breakdowns can occur because of simple error or mistake. Additionally, controls can be circumvented by the individual acts of some persons, by collusion of two or more people, or by unauthorized override of the control. The design of any system of controls is also based in part upon certain assumptions about the likelihood of future events, and there can be no assurance that any design will succeed in achieving its stated goals under all potential future conditions. Accordingly, because of the inherent limitations in a cost-effective control system, misstatements due to error or fraud may occur and not be detected.

Management, including the CEO and CFO, evaluated the effectiveness of the design and operation of the Company’s disclosure controls and procedures, as defined in the rules of the United States Securities and Exchange Commission and the Canadian Securities Administrators, as at December 31, 2023. Based on this evaluation, the CEO and CFO concluded that the Company’s disclosure controls and procedures were not effective as at December 31, 2023, and at September 30, 2024, as a result of the material weaknesses described below.

Page 25
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

INTERNAL CONTROL OVER FINANCIAL REPORTING

Management is responsible for establishing and maintaining adequate internal controls over financial reporting, as this term is defined in National Instrument 52-109 “Certification of Disclosure in Issuers’ Annual and Interim Filings” in Canada and Rules 13a-15(f) and 15d-15(f) of the Exchange Act in the United States. The Company’s ICFR are designed to provide reasonable assurance regarding the reliability of the Company’s financial reporting for external purposes in accordance with IFRS.

An evaluation of the Company’s internal controls over financial reporting at December 31, 2023 was conducted based on the COSO Framework (2013). This evaluation identified material weaknesses in both the design and operational effectiveness of internal controls over financial reporting. A material weakness is a deficiency or combination of deficiencies in internal control over financial reporting such that there is a reasonable possibility that a material misstatement of our financial statements will not be prevented or detected on a timely basis.

We determined that management’s review controls at our Mexican operating subsidiary were not designed or operating effectively as at December 31, 2023 and at September 30, 2024. Specifically, there was insufficient (i) documentation to evidence the performance of multiple key controls, (ii) operation of management review controls at a level of precision necessary to identity all potentially material errors, and (iii) verification of the completeness and accuracy of the data used in the performance of controls. The foregoing also impacted the information used in executing the Company’s corporate oversight controls, causing some of them to operate ineffectively as at December 31, 2023. The Company considered this a material weakness in its ICFR.

It was also determined during management’s assessment that certain information technology general controls (“ITGCs”) were not designed or operating effectively as at December 31, 2023 and at September 30, 2024, in the areas of user access and change management over an IT system that supports the Company’s financial reporting process. This resulted in inadequate segregation of duties for its IT application controls. The automated and manual business process controls that are dependent on the affected ITGCs were also deemed to not be operating effectively as at December 31, 2023, because they had been impacted by the foregoing. The Company considered this a material weakness in its ICFR.

These material weaknesses were previously identified and disclosed in our 2023 annual filing. They impacted all of the significant classes of transactions of the Company. To remediate these material weaknesses, the Company has begun instituting more detailed reviews and validation procedures for data used in financial reporting, with an emphasis on maintaining comprehensive documentation of these reviews. We are conducting training sessions for mine personnel to underscore the importance of executing and evidencing their reviews to support the integrity of reported financial information. We have imposed additional restrictions on privileged access to our IT system, and we are adding and improving controls to enforce segregation of duties within our IT system. The Company is implementing additional change management systems, such as more extensive testing and formalized IT change authorizations. We are also implementing more controls to monitor, on an ongoing basis, changes and access to our IT system.

These improvements are targeted for completion during the 2024 fiscal year.

There have been no other changes in our internal control over financial reporting that occurred during our fiscal quarter ended September 30, 2024, that have materially affected or are reasonably likely to materially affect our internal control over financial reporting.

Page 26
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated
XVII. CAUTIONARY NOTES
--- ---

CAUTIONARY NOTE TO UNITED STATES INVESTORS REGARDING PRESENTATION OF MINERAL RESERVE AND MINERAL RESOURCE ESTIMATES

This MD&A has been prepared in accordance with Canadian standards for the reporting of mineral resource and mineral reserve estimates, which differ from the previous and current standards of the United States securities laws. In particular, and without limiting the generality of the foregoing, the terms “mineral reserve”, “proven mineral reserve”, “probable mineral reserve”, “inferred mineral resources”, “Indicated mineral resources”, “measured mineral resources”, and “mineral resources” used or referenced in this MD&A are Canadian mineral disclosure terms as defined in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards on mineral reserves and mineral resources adopted by the CIM Council on May 10, 2014 (the “CIM Standards”).

For United States reporting purposes, the United States Securities and Exchange Commission (the “SEC”) has adopted amendments to its disclosure rules (the “SEC Modernization Rules”) to modernize the mining property disclosure requirements for issuers whose securities are registered with the SEC under the Securities Exchange Act of 1934, as amended. The SEC Modernization Rules more closely align the SEC’s disclosure requirements and policies for mining properties with current industry and global regulatory practices and standards, including NI 43-101, and replace the historical property disclosure requirements for mining registrants that were included in Industry Guide 7 under the Securities Act of 1933, as amended (the “Securities Act”). As a foreign private issuer that is eligible to file reports with the SEC pursuant to the multijurisdictional disclosure system, the Company is not required to provide disclosure on its mineral properties under the SEC Modernization Rules and provides disclosure under NI 43-101 and the CIM Standards. Accordingly, mineral reserve and mineral resource information contained in this MD&A may not be comparable to similar information disclosed by United States companies.

As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources.” In addition, the SEC has amended its definitions of “proven mineral reserves” and “probable mineral reserves” to be “substantially similar” to the corresponding CIM Standards that are required under NI 43-101. While the above terms are “substantially similar” to CIM Standards, there are differences in the definitions under the SEC Modernization Rules and the CIM Standards. There is no assurance any mineral reserves or mineral resources that the Company may report as “proven mineral reserves”, “probable mineral reserves”, “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43-101 would be the same had the Company prepared the reserve or resource estimates under the standards adopted under the SEC Modernization Rules or under the prior standards of Industry Guide 7. Accordingly, information contained in this MD&A may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and regulations thereunder.

CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION

This MD&A contains “forward-looking statements” or “forward-looking information” within the meaning of applicable securities legislation (collectively referred to herein as “forward-looking information” or “forward-looking statements”). Forward-looking statements are included to provide information about management’s current expectations and plans that allows investors and others to get a better understanding of the Company’s operating environment, the business operations and financial performance and condition. Forward-looking information is provided as of the date of such documents only and the Company does not intend, and does not assume any obligation, to update this forward-looking information, except as required by law.

Forward-looking statements include, but are not limited to, statements regarding: planned development and mining activities and expenditures, including estimated rates of production, AISC, production plans; proposed exploration plans and expected results and timing thereof; statements based on exploration and metallurgical results; timelines for receipt of any required agreements, approvals, or permits, including the MIA at Camino Rojo and the timing of permitting and construction at South Railroad; mineral resource updates; terms of and ability to reach a subsequent agreement with Fresnillo to access the sulphide mineral resource at the Camino Rojo Project and obtaining regulatory approvals related thereto; the Company’s ability to remediate material weaknesses in its internal controls over financial reporting; and the Company’s objectives and strategies. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, identified by words or phrases such as “expects”, “is expected”, “anticipates”, “believes”, “plans”, “projects”, “estimates”, “assumes”, “intends”, “strategy”, “goals”, “objectives”, “potential”, “possible” or variations thereof or stating that certain actions, events, conditions or results “may”, “could”, “would”, “should”, “might” or “will” be taken, occur or be achieved (or the negative of any of these terms and similar expressions)) are not statements of fact and may be forward-looking statements.

Page 27
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

Forward-looking statements are necessarily based upon a number of factors and assumptions that, if untrue, could cause actual results, performance, or achievements to be materially different from future results, performance or achievements expressed or implied by such statements. Forward-looking statements are based upon a number of estimates and assumptions that, while considered reasonable by the Company at this time, are inherently subject to significant business, economic and competitive uncertainties and contingencies that may cause the Company’s actual financial results, performance, or achievements to be materially different from those expressed or implied herein. Some of the material factors or assumptions used to develop forward-looking statements include, without limitation, the future price of gold and silver; anticipated costs and the Company’s ability to fund its programs; the Company’s ability to carry on exploration, development, and mining activities; tonnage of ore to be mined and processed; ore grades and recoveries; decommissioning and reclamation estimates; currency exchange rates remaining as estimated; prices for energy inputs, labour, materials, supplies and services remaining as estimated; the Company’s ability to secure and to meet obligations under property agreements, including the Layback Agreement; that all conditions of the Company’s Revolving Facility will be met; the timing and results of drilling programs; mineral reserve and mineral resource estimates and the assumptions on which they are based; the discovery of mineral resources and mineral reserves on the Company’s mineral properties; the obtaining of a subsequent agreement with Fresnillo to access the sulphide mineral resource at the Camino Rojo Project and develop the entire Camino Rojo Project mineral resources estimate; that political and legal developments will be consistent with current expectations; the timely receipt of required approvals and permits, including those approvals and permits required for successful project permitting, construction, and operation of projects; the timing of cash flows; the costs of operating and exploration expenditures; the Company’s ability to operate in a safe, efficient, and effective manner; the Company’s ability to obtain financing as and when required and on reasonable terms; that the Company’s activities will be in accordance with the Company’s public statements and stated goals; and that there will be no material adverse change or disruptions affecting the Company or its properties.

Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Certain important factors that could cause actual results, performance or achievements to differ materially from those in the forward-looking statements include, among others: uncertainty and variations in the estimation of mineral resources and mineral reserves; the Company’s dependence on the Camino Rojo Oxide Mine; risks related to exploration, development, and operation activities; foreign country and political risks, including risks relating to foreign operations; risks related to the Cerro Quema Project; delays in obtaining or failure to obtain governmental permits, or non-compliance with permits; environmental and other regulatory requirements; risks related to the Company’s indebtedness; delays in or failures to enter into a subsequent agreement with Fresnillo with respect to accessing certain additional portions of the mineral resource at the Camino Rojo Project and to obtain the necessary regulatory approvals related thereto; the mineral resource estimations for the Camino Rojo Project being only estimates and relying on certain assumptions; loss of, delays in, or failure to get access from surface rights owners; uncertainties related to title to mineral properties; water rights; risks related to natural disasters, terrorist acts, health crises, and other disruptions and dislocations; financing risks and access to additional capital; risks related to guidance estimates and uncertainties inherent in the preparation of feasibility studies; uncertainty in estimates of production, capital, and operating costs and potential production and cost overruns; the fluctuating price of gold and silver; unknown labilities in connection with acquisitions; global financial conditions; uninsured risks; climate change risks; competition from other companies and individuals; conflicts of interest; risks related to compliance with anti-corruption laws; volatility in the market price of the Company's securities; assessments by taxation authorities in multiple jurisdictions; foreign currency fluctuations; the Company’s limited operating history; litigation risks; the Company’s ability to identify, complete, and successfully integrate acquisitions; intervention by non-governmental organizations; outside contractor risks; risks related to historical data; the Company not having paid a dividend; risks related to the Company’s foreign subsidiaries; risks related to the Company’s accounting policies and internal controls; the Company’s ability to satisfy the requirements of the Sarbanes–Oxley Act of 2002; enforcement of civil liabilities; the Company’s status as a passive foreign investment company for U.S. federal income tax purposes; information and cyber security; the Company’s significant shareholders; gold industry concentration; shareholder activism; and other risks associated with executing the Company’s objectives and strategies.

Page 28
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

This list is not exhaustive of the factors that may affect any of the Company’s forward-looking statements. Although the Company believes its expectations are based upon reasonable assumptions and have attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. See the section entitled “Risk Factors” below, and in the section entitled “Risk Factors” in the Annual Information Form, for additional risk factors that could cause results to differ materially from forward-looking statements.

Investors are cautioned not to put undue reliance on forward-looking statements. The forward-looking statements contained herein are made as of the date of this MD&A only and, accordingly, are subject to change after such date. The Company disclaims any intent or obligation to update publicly or otherwise revise any forward-looking statements or the foregoing list of assumptions or factors, whether as a result of new information, future events or otherwise, except in accordance with applicable securities laws. Investors are urged to read the Company’s filings with Canadian securities regulatory agencies, which can be viewed online under the Company’s profile on SEDAR+ at www.sedarplus.ca and the Company’s documents filed with, or furnished to, the SEC, which are available through EDGAR at www.sec.gov.

Page 29
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated
XVIII. RISKS AND UNCERTAINTIES
--- ---

For more extensive discussion on risks anduncertainties, refer to the Annual Information Form for additional information regarding these risks and other risks and uncertaintiesin respect of the Company's business and share price.

The risks described below are not the onlyrisks and uncertainties that the Company faces. Although the Company has done its best to identify the risks to its business, there isno assurance that it has captured every material or potentially material risk and the risks identified below may become more materialto the Company in the future or could diminish in importance. Additional existing risks and uncertainties not presently identified bythe Company, risks that the Company currently does not consider to be material, and risks arising in the future could cause actual eventsto differ materially from those described in the Company's forward-looking information, which could materially affect the Company's business,results of operations, financial condition, and Company’s share price.

ESTIMATES OF MINERAL RESOURCES AND MINERAL RESERVES AND PRODUCTION RISKS

The figures for mineral reserves and mineral resources contained in the Company’s public disclosure record are estimates only and no assurance can be given that the anticipated tonnages and grades will be achieved, that the indicated level of recovery will be realized, or that mineral reserves or mineral resources will be mined or processed profitably. The Company cannot give any assurance that such estimates will be achieved. Failure to achieve such estimates could have an adverse impact on the Company’s future cash flows, profitability, results of operations, and financial condition.

Until a deposit is actually mined and processed, the quantity of metal and grades must be considered as estimates only. Actual mineral reserves or mineral resources may not conform to geological, metallurgical, or other expectations, and the volume and grade of ore recovered may differ from estimated levels. There are numerous uncertainties inherent in estimating mineral reserves and mineral resources, including many factors beyond the Company’s control. Such estimation is a subjective process, and the accuracy of any mineral reserve or mineral resource estimate is a function of the quantity and quality of available data and of the assumptions made and judgments used in engineering and geological interpretation. It is inherently impossible to have full knowledge of particular geological structures, faults, voids, intrusions, natural variations in and within rock types and other occurrences. Failure to identify such occurrences in the Company’s assessment of mineral reserves and mineral resources may have a material adverse effect on the Company’s future cash flows, results of operations, and financial condition.

DEPENDENCE ON THE CAMINO ROJO OXIDE MINE

The Camino Rojo Oxide Mine accounts for all of the Company's current production and is expected to continue to account for all of its production in the near term. Any adverse condition affecting mining, processing conditions, expansion plans, or ongoing permitting at the Camino Rojo Oxide Mine could have a material adverse effect on the Company's financial performance and results of operations. Even though the Company has established mining operations and estimates of future production, various factors, including costs, actual mineralization, consistency and reliability of ore grades, processing rates, and commodity prices can affect cash flow and profitability, and there can be no assurance that current or future estimates of these factors will reflect actual results and performance. The cost and availability of suitable machinery, supplies, mining equipment, and skilled labour, the existence of competent operational management and prudent financial administration, as well as the availability and reliability of appropriately skilled and experienced consultants, can also affect successful project operations. The activities of the Company at the Camino Rojo Oxide Mine may also be subject to prolonged disruption from a variety of risks normally encountered in production of precious metals as further described under “Mining Industry” below. The failure of the Company to achieve its production estimates could have a material and adverse effect on future cash flows, profitability, results of operations, and financial condition.

EXPLORATION, DEVELOPMENT, AND PRODUCTION RISKS

The business of exploring for minerals, development, and mining involves a high degree of risk. The operations of the Company may be disrupted by a variety of risks and hazards normally encountered in the exploration, development, and production of precious metals, including, without limitation, unusual and unexpected geologic formations, seismic activity, rock bursts, cave-ins, flooding, and other conditions involved in the drilling and removal of material, any of which could result in damage to, or destruction of, mines and other producing facilities, personal injury or loss of life, and damage to tailings dams, property, and environmental damage, all of which may result in possible legal liability. The occurrence of any of these events could result in a prolonged interruption of the Company’s activities that would have a material adverse effect on its business, financial condition, results of operations, and prospects. Further, the Company may be subject to liability or sustain losses in relation to certain risks and hazards against which it cannot insure or for which it may elect not to insure. The occurrence of operational risks and/or a shortfall or lack of insurance coverage could have a material adverse impact on the Company’s results of operations and financial condition.

Page 30
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

The exploration for and development of mineral deposits involves significant risks, which even a combination of careful evaluation, experience, and knowledge may not eliminate. While the discovery of an ore body may result in substantial rewards, few properties that are explored are ultimately developed into producing mines. Even when mineralization is discovered, it may take several years until production is possible, during which time the economic feasibility of production may change. Major expenses may be required to locate and establish mineral reserves, to develop metallurgical processes, and to construct mining and processing facilities at a particular site. It is impossible to ensure that the exploration or development programs planned by the Company will result in a profitable commercial mining operation. Whether a mineral deposit will be commercially viable depends on a number of factors, some of which are: the particular attributes of the deposit, such as size, grade and proximity to infrastructure, metal prices that are highly cyclical, and government regulations, including regulations relating to prices, taxes, royalties, land tenure, land use, importing and exporting of minerals, and environmental protection. The exact effect of these factors cannot be accurately predicted, but the combination of these factors may result in the Company not receiving an adequate return on invested capital. There is no certainty that the expenditures made towards the search and evaluation of mineral deposits will result in discoveries or development of commercial quantities of ore. Development projects have no operating history upon which to base estimates of future capital and operating costs. For development projects, mineral resource estimates and estimates of operating costs are, to a large extent, based upon the interpretation of geologic data obtained from drill holes and other sampling techniques, and feasibility and pre-feasibility studies, which derive estimates of capital and operating costs based upon anticipated tonnage and grades of ore to be mined and processed, ground conditions, the configuration of the ore body, expected recovery rates of minerals from ore, estimated operating costs, and other factors. As a result, actual production, cash operating costs, and economic returns could differ significantly from those estimated. It is not unusual for new mining operations to experience problems during the start-up phase, and delays in the commencement of production can often occur.

FOREIGN COUNTRY AND POLITICAL RISK

The Company’s principal mineral properties are located in Mexico and the United States. The Company is subject to certain risks as a result of conducting foreign operations, including, but not limited to: currency fluctuations; possible political or economic instability that may result in the impairment or loss of mineral titles or other mineral rights; opposition from environmental or other non-governmental organizations; government regulations relating to the mining industry; renegotiation, cancellation, or forced modification of existing contracts; expropriation or nationalization of property; changes in laws or policies or increasing legal and regulatory requirements including those relating to taxation, royalties, imports, exports, duties, currency, or other claims by government entities, including retroactive claims and/or changes in the administration of laws, policies, and practices; uncertain political and economic environments; war, terrorism, narco-terrorist actions or activities, sabotage, and civil disturbances; delays in obtaining or the inability to obtain or maintain necessary governmental or similar permits or to operate in accordance with such permits or regulatory requirements; currency fluctuations; import and export regulations, including restrictions on the export of gold or other minerals; limitations on the repatriation of earnings; and increased financing costs. Any changes in regulations or shifts in political attitudes are beyond the control of the Company and may adversely affect its business.

The introduction of new tax laws, regulations, or rules, or changes to, or differing interpretation of, or application of, existing tax laws, regulations, or rules in any of the countries in which the Company currently conducts business or in the future may conduct business, could result in an increase in taxes, or other governmental charges, duties, or impositions. No assurance can be given that new tax laws, rules, or regulations will not be enacted or that existing tax laws will not be changed, interpreted, or applied in a manner that could result in the Company being subject to additional taxation or that could otherwise have a material adverse effect on the Company.

Page 31
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

Although the Company believes that its exploration and production activities are currently carried out in accordance with all applicable rules and regulations, new rules and regulations may be enacted, and existing rules and regulations may be applied in a manner that could limit or curtail production or development of the Company’s properties. Amendments to current laws and regulations governing the operations and activities of the Company or more stringent implementation thereof could have a material adverse effect on the Company’s business, financial condition, and results of operations.

The Company does not carry political risk insurance.

PERMITS AND LICENSES

The Company’s operations in each of the jurisdictions in which it operates are subject to receiving and maintaining permits (including environmental permits) from appropriate governmental authorities. Furthermore, prior to any development on any of its properties, the Company must receive permits from appropriate governmental authorities. The Company can provide no assurance that necessary permits will be obtained, that previously issued permits will not be suspended for a variety of reasons, including through government or court action, or that delays will not occur in connection with obtaining all necessary permits, renewals of permits for existing operations, or additional permits for any possible future changes to operations, or additional permits associated with new legislation. In addition, the timing of permits is uncertain and processing times may be negatively affected by unforeseen circumstances, such as the coronavirus (COVID-19). The Company can provide no assurance that it will continue to hold or obtain, if required to, all permits necessary to develop or continue operating at any particular site, which would materially adversely affect its operations.

GOVERNMENT REGULATION

The exploration, development, and mining activities of the Company are subject to various federal, provincial/state, and local laws governing prospecting, development, taxes, labour standards, toxic substances, and other matters. Exploration, development, and mining activities are also subject to various federal, provincial/state, and local laws and regulations relating to the protection of the environment. These laws mandate, among other things, the maintenance of air and water quality standards, and land reclamation. These laws also set forth limitations on the generation, transportation, storage, and disposal of solid and hazardous waste. Although the Company’s exploration, development, and mining activities are currently carried out in accordance with all applicable rules and regulations governing operations and exploration activities, no assurance can be given that new rules and regulations, amendments to current laws and regulations or more stringent implementation thereof could have a substantial adverse impact on the Company’s activities.

ENVIRONMENTAL RISKS AND HAZARDS

All phases of the Company’s mineral exploration, development, and mining operations are subject to environmental regulation in the various jurisdictions in which it operates. Environmental legislation is evolving in a manner which will require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and a heightened degree of responsibility for companies and their officers, directors, and employees. There is no assurance that future changes in environmental regulations, laws, and permits, if any, will not adversely affect the Company’s operations. Environmental hazards may exist on the properties on which the Company holds interests which are unknown to the Company at present, which have been caused by previous or existing owners or operators of the properties. The Company may become liable for such environmental hazards caused by previous owners and operators of the properties even where it has attempted to contractually limit its liability.

Government approvals and permits are currently, and may in the future be, required in connection with the Company’s operations. To the extent such approvals are required and not obtained; the Company may be curtailed or prohibited from proceeding with planned exploration, development, or mining of mineral properties.

Failure to comply with applicable laws, regulations, and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment, or remedial actions. Parties engaged in mining operations may be required to compensate those suffering loss or damage by reason of the mining activities and may have civil or criminal fines or penalties imposed for violations of applicable laws or regulations.

Page 32
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

INDEBTEDNESS

Although, as of the date of this MD&A, the Company has no principal amount outstanding under its Revolving Facility, the Company is still required to comply with various affirmative and negative covenants and financial ratios associated with it commitments under the Revolving Facility. These covenants and ratios limit, among other things, the Company’s ability to incur further indebtedness, create certain liens on assets,engage in certain types of transactions, or pay dividends. The Company cannot provide any assurances that these restrictions will not limit its ability to respond to future changes in its business or competitive activities, or restrict its ability to engage in mergers, acquisitions, or dispositions or acquisitions of assets. Furthermore, failure to comply with these covenants and ratios would likely result in an event of default under the Revolving Facility and would allow the lenders to terminate the facility, which could materially and adversely affect the Company’s business, financial condition, and results of operations. In addition, if the Company draws down funds under the Revolving Facility in future periods, the Company would be required to use a portion of its cash flows to service principal and interest on the Revolving Facility, which would limit the Company’s cash flows available for other business opportunities. In such case, the Company’s ability to make payments of principal or interest on, or to refinance, its indebtedness would depend on the Company’s future performance, which is subject to economic, financial, competitive, and other factors beyond its control. The Company may not in future generate sufficient cash flow from operations to service debt and make necessary capital expenditures, which could result in the Company having to adopt measures such as selling assets, restructuring debt, or obtaining additional equity capital on potentially onerous or highly dilutive terms. The Company’s ability to refinance its indebtedness would depend on the capital markets and its financial condition at such time. The Company may not be able to engage in any of these activities or engage in these activities on desirable terms, which could result in a default under the Revolving Facility, which in turn could materially and adversely affect the Company’s business, financial condition, or results of operations.

THE CAMINO ROJO MINERAL RESOURCE ESTIMATE ASSUMES THAT THE COMPANY CAN ACCESS MINERAL TITLES AND LANDS THAT ARE NOT CONTROLLED BY THE COMPANY

All of the mineralization comprised in the Company’s mineral resource estimate with respect to the Camino Rojo Project is contained on mineral titles controlled by Orla. However, the mineral resource estimate assumes that the north wall of the conceptual floating pit cone used to demonstrate reasonable prospects for eventual economic extraction extends onto lands where mineral title is held by Fresnillo and that waste would be mined on Fresnillo’s mineral titles. On December 21, 2020, Orla announced that it had completed the Layback Agreement. The Layback Agreement allows Orla to expand the Camino Rojo Oxide Mine pit onto part of Fresnillo’s mineral concession located immediately north of Orla’s property. This expansion will increase oxide ore available for extraction on Orla’s property below the pit outlined in Orla’s previous, 2019 technical report on the project.

However, the Layback Agreement is only with respect to the portion of the heap leach material included in the current mineral reserve. As such, any potential development of the Camino Rojo Project that includes an open pit encompassing the entire mineral resource estimate would be dependent on an additional agreement with Fresnillo (or any potential subsequent owner of the mineral titles). It is estimated that approximately two-thirds of the mill resource estimate and one-quarter of the leach resource estimate comprising the mineral resource estimate are dependent on this additional agreement being entered into with Fresnillo. The leach mineral resource dependent on the additional agreement is mainly comprised of less oxidized transitional material with the lowest predicted heap-leach recoveries.

Delays in, or failure to obtain, an additional agreement with Fresnillo would affect the development of a significant portion of the mineral resources of the Camino Rojo Project that are not included in the 2021 Camino Rojo Report mine plan, in particular by limiting access to significant mineralized material at depth. There can be no assurance that the Company will be able to negotiate such additional agreement on terms that are satisfactory to the Company and Fresnillo or that there will not be delays in obtaining the necessary additional agreement. Should such a subsequent agreement with Fresnillo not be obtained on favourable terms, the economics of any potential mine development using the full mineral resource estimate would be significantly negatively impacted.

Page 33
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

MINERAL RESOURCE ESTIMATIONS FOR CAMINO ROJO ARE ONLY ESTIMATES AND RELY ON CERTAIN ASSUMPTIONS

The estimation of mineral resources relies on the judgment of the independent Qualified Person preparing the estimates. The process relies on the quantity and quality of available data and is based on knowledge, mining experience, analysis of drilling results, and industry practices. Valid estimates made at a given time may significantly change when new information becomes available.

In particular, the estimation of mineral resources for the Camino Rojo Project has assumed that there is a reasonable prospect for reaching an additional agreement with Fresnillo with respect to the mill resource included in the mineral resource estimate. While the Company believes that the mineral resource estimates for the Camino Rojo Project are well established and reflect best estimates, by their nature resource estimates are imprecise and depend on inferences that may ultimately prove to be inaccurate, including the assumption that an additional agreement with Fresnillo will be reached.

Although all mineralization included in the Company’s mineral resource estimate for the Camino Rojo Project are located on mineral concessions controlled by the Company, failure to reach an additional agreement with Fresnillo would result in a significant reduction of the mineral resource estimate by limiting access to mineral resources below the current mineral reserves. Any material changes in mineral resource estimates may have a material adverse effect on the Company.

SURFACE RIGHTS

There are four ejido communities in the vicinity of the main area of drilling at the Camino Rojo Project and other ejido lands cover most of the rest of the property. The lands that are used by the Company for the open pit mine and heap leach facility are subject to an expropriation agreement between the Company and the Ejido San Tiburcio. Currently, the Company has the legal possession of such lands until 2043. For exploration activities, the Company enters into temporary occupation agreements with the ejido communities, which allow the Company to use the surface of the lands for its mining activities for a set period of time. In Mexico, mining rights that are covered under a concession do not include direct ownership or possession rights over the surface, or surface access, and at any particular time the Company may be involved in negotiations with various ejido communities to enter into new temporary occupation agreements or other surface access agreements or amend existing agreements. Failure to reach new agreements or disputes regarding existing agreements may cause, blockades, suspension of operations, delays to projects, and, on occasion, may lead to legal disputes. Any such failure to reach new agreements or disputes regarding existing agreements may have a material adverse effect on the Company’s business.

Access to the Company’s South Railroad Project and certain mineral properties at the project are or will be governed by surface use agreements or other forms of access rights or agreements such as easements and rights-of-way. Failure to meet or otherwise satisfy required contractual obligations and make payments with respect to such agreements and rights or to otherwise obtain such agreements or rights may result in loss of access to the project or to certain mineral properties.

TITLE MATTERS

The acquisition of title to mineral tenures in Mexico and the United States is a detailed and time-consuming process. Although the Company has diligently investigated title to all mineral tenures and, to the best of its knowledge, title to all of its properties is in good standing, this should not be construed as a guarantee of title. The Company can provide no assurances that there are no title defects affecting its properties. Other parties may dispute title to any of the Company’s mineral properties and any of the Company’s properties may be subject to prior unregistered liens, agreements, transfers or claims, and title may be affected by, among other things, undetected encumbrances or defects or governmental actions. Title to the Company’s properties may also be affected by undisclosed and undetected defects. If any claim or challenge is made regarding title, the Company may be subject to monetary claims or be unable to develop properties as permitted or to enforce its rights with respect to its properties.

Page 34
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

OUR ACTIVITIES MAY BE ADVERSELY AFFECTED BY NATURAL DISASTERS, TERRORIST ACTS, HEALTH CRISES AND OTHER DISRUPTIONS AND DISLOCATIONS, WHETHER THOSE EFFECTS ARE LOCAL, NATIONWIDE, OR GLOBAL

Upon the occurrence of a natural disaster, pandemic, or upon an incident of war, riot, or civil unrest, the impacted country, and the overall global economy, may not efficiently and quickly recover from such an event, which could have a material adverse effect on the Company. Terrorist attacks, public health crises including epidemics, pandemics, outbreaks of new infectious diseases or viruses, and related events can result in volatility and disruption to global supply chains, operations, mobility of people, patterns of consumption and service, and the financial markets, which could affect interest rates, credit ratings, credit risk, inflation, business, financial conditions, results of operations, and other factors relevant to the Company.

COMMODITY PRICES

The profitability of mining operations is significantly affected by changes in the market price of gold and other minerals. The level of interest rates, the rate of inflation, world supply of these minerals and stability of exchange rates can all cause significant fluctuations in metal prices. Such external economic factors are in turn influenced by changes in international investment patterns and monetary systems and political developments. The price of gold and other minerals has fluctuated widely in recent years, and future serious price declines could cause commercial production to be impracticable.

UNKNOWN LIABILITIES IN CONNECTION WITH ACQUISITIONS

The Company has assumed certain liabilities and risks as part of its acquisitions. While the Company conducted thorough due diligence in connection with such acquisitions, there may be liabilities or risks that the Company failed, or was unable, to discover in the course of performing the due diligence investigations or for which the Company was not indemnified. Any such liabilities, individually or in the aggregate, could have a material adverse effect on the Company’s financial position and results of operations.

UNINSURED RISKS

The Company carries insurance to protect against certain risks in such amounts as it considers adequate. Risks not insured against include environmental pollution or other hazards against which such corporations cannot insure or against which they may elect not to insure.

ACQUISITIONS AND INTEGRATION

From time to time, the Company examines opportunities to acquire additional mining assets and businesses. Any acquisition that the Company may choose to complete may be of a significant size, may change the scale of the Company’s business and operations, and may expose the Company to new geographic, political, operating, financial, and geological risks. The Company’s success in its acquisition activities depends on its ability to identify suitable acquisition candidates, negotiate acceptable terms for any such acquisition, and integrate the acquired operations successfully with those of the Company.

LITIGATION RISK

All industries, including the mining industry, are subject to legal claims, with and without merit. Defense and settlement costs of legal claims can be substantial, even with respect to claims that have no merit. Due to the inherent uncertainty of the litigation and dispute resolution process, the litigation process could take away from management time and efforts and the resolution of any particular legal proceeding to which the Company may become subject could have a material adverse effect on the Company’s financial position, results of operations, or the Company’s property development or operations.

Page 35
ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2024 United States dollars unless otherwise stated

CONFLICTS OF INTEREST

Certain directors of the Company also serve as directors and/or officers of other companies involved in natural resource exploration and development. Consequently, there exists the possibility for such directors to be in a position of conflict. Any decision made by such directors involving the Company will be made in accordance with their duties and obligations to deal fairly and in good faith with the Company and such other companies. In addition, such directors will declare, and refrain from voting on, any matter in which such directors may have a conflict of interest.

COMPLIANCE WITH ANTI-CORRUPTION LAWS

The Company is subject to various anti-corruption laws and regulations including, but not limited to, the Canadian Corruption of Foreign Public Officials Act, the US ForeignCorrupt Practices Act, and similar laws in any country in which the Company conducts business. In general, these laws prohibit a company and its employees and intermediaries from bribing or making other prohibited payments to foreign officials or other persons to obtain or retain business or gain some other business advantage. In recent years, there has been a general increase in both the frequency of enforcement and the severity of penalties under such laws, resulting in greater scrutiny and punishment to companies convicted of violating anti-corruption and anti-bribery laws. Furthermore, a company may be found liable for violations by not only its employees, but also by its contractors and third-party agents.

The Company’s Camino Rojo Project is located in Mexico and the Cerro Quema Project is located in Panama, both of which countries which are perceived as having fairly high levels of corruption. Orla cannot predict the nature, scope, or effect of future anti-corruption regulatory requirements to which the Company’s operations might be subject or the manner in which existing laws might be administered or interpreted.

Failure to comply with the applicable legislation and other similar foreign laws could expose the Company and/or its senior management to civil and/or criminal penalties, other sanctions and remedial measures, legal expenses, and reputational damage, all of which could materially and adversely affect the Company’s business, financial condition, and results of operations. Likewise, any investigation of any potential violations of the applicable anti-corruption legislation by Canadian, American, or foreign authorities could also have an adverse impact on the Company’s business, financial condition, and results of operations.

As a consequence of these legal and regulatory requirements, the Company has instituted policies with regard to anti-corruption and anti-bribery, as well as business ethics, which have been designed to ensure that Orla and its employees comply with applicable anti-corruption laws and regulations. However, there can be no assurance or guarantee that such efforts have been and will be completely effective in ensuring the Company’s compliance, and the compliance of its employees, consultants, contractors, and other agents, with all applicable anti-corruption laws and regulations.

Page 36

Exhibit 99.3

FORM 52-109F2

CERTIFICATION OF INTERIM FILINGS

FULL CERTIFICATE

I, Jason Simpson, Chief Executive Officer of OrlaMining Ltd, certify the following:

1. Review: I have reviewed the interim financial report and interim MD&A (together, the “interim filings”) of<br>Orla Mining Ltd. (the “issuer”) for the interim period ended September 30, 2024.
2. No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any<br>untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not<br>misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.
--- ---
3. Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with<br>the other financial information included in the interim filings fairly present in all material respects the financial condition, financial<br>performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.
--- ---
4. Responsibility: The issuer’s other certifying officer and I are responsible for establishing and maintaining disclosure<br>controls and procedures (“DC&P”) and internal control over financial reporting (“ICFR”), as those terms are<br>defined in National Instrument 52-109 Certification of Disclosure in Issuers’ Annual and Interim Filings, for the issuer.
--- ---
5. Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer’s other certifying officer<br>and I have, as at the end of the period covered by the interim filings
--- ---
(a) designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that
--- ---
(i) material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings<br>are being prepared; and
--- ---
(ii) information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it<br>under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation;<br>and
--- ---
(b) designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial<br>reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP.
--- ---
5.1 Control framework: The control framework the issuer’s other certifying officer and I used to design the issuer’s<br>ICFR is "Internal Control – Integrated Framework (2013)" published by the Committee of Sponsoring Organizations of the<br>Treadway Commission ("COSO").
--- ---
5.2 ICFR – material weakness relating to design: The issuer has disclosed in its interim MD&A foreach material weakness<br>relating to design existing at the end of the interim period,
--- ---
(a) a description of the material weakness;
--- ---
(b) the impact of the material weakness on the issuer’s financial reporting and its ICFR; and
--- ---
(c) the issuer’s current plans, if any, or any actions already undertaken, for remediating the material weakness.
--- ---
5.3 Limitation on scope of design: N/A
--- ---
6. Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer’s ICFR that occurred<br>during the period beginning on July 1, 2024, and ended on September 30, 2024, that has materially affected, or is reasonably<br>likely to materially affect, the issuer’s ICFR.
--- ---
Date: November 12, 2024
--- ---
/s/ Jason Simpson
---
Jason Simpson
Chief Executive Officer

Exhibit 99.4


FORM 52-109F2

CERTIFICATION OF INTERIM FILINGS

FULL CERTIFICATE

I, Etienne Morin, Chief Financial Officer of OrlaMining Ltd, certify the following:

1. Review: I have reviewed the interim financial report and interim MD&A (together, the “interim filings”) of<br>Orla Mining Ltd. (the “issuer”) for the interim period ended September 30, 2024.
2. No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any<br>untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not<br>misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.
--- ---
3. Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with<br>the other financial information included in the interim filings fairly present in all material respects the financial condition, financial<br>performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.
--- ---
4. Responsibility: The issuer’s other certifying officer and I are responsible for establishing and maintaining disclosure<br>controls and procedures (“DC&P”) and internal control over financial reporting (“ICFR”), as those terms are<br>defined in National Instrument 52-109 Certification of Disclosure in Issuers’ Annual and Interim Filings, for the issuer.
--- ---
5. Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer’s other certifying officer<br>and I have, as at the end of the period covered by the interim filings
--- ---
(a) designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that
--- ---
(i) material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings<br>are being prepared; and
--- ---
(ii) information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it<br>under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation;<br>and
--- ---
(b) designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial<br>reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP.
--- ---
5.1 Control framework: The control framework the issuer’s other certifying officer and I used to design the issuer’s<br>ICFR is "Internal Control – Integrated Framework (2013)" published by the Committee of Sponsoring Organizations of the<br>Treadway Commission ("COSO").
--- ---
5.2 ICFR – material weakness relating to design: The issuer has disclosed in its interim MD&A foreach material weakness<br>relating to design existing at the end of the interim period,
--- ---
(a) a description of the material weakness;
--- ---
(b) the impact of the material weakness on the issuer’s financial reporting and its ICFR; and
--- ---
(c) the issuer’s current plans, if any, or any actions already undertaken, for remediating the material weakness.
--- ---
5.3 Limitation on scope of design: N/A
--- ---
6. Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer’s ICFR that occurred<br>during the period beginning on July 1, 2024, and ended on September 30, 2024, that has materially affected, or is reasonably<br>likely to materially affect, the issuer’s ICFR.
--- ---
Date: November 12, 2024
--- ---
/s/ Etienne Morin
---