6-K

Skeena Resources Ltd (SKE)

6-K 2022-12-06 For: 2022-12-06
View Original
Added on April 11, 2026

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 6-K

REPORT OF FOREIGN PRIVATE ISSUER

Pursuant to Rule 13a-16 or 15d-16 of

the Securities Exchange Act of 1934

For the month of December 2022

SKEENA RESOURCES LIMITED

(Translation of Registrant's Name into English)

001-40961

(Commission File Number)

1021 West Hastings Street, Suite 650, Vancouver, British Columbia, V6E 0C3, Canada

(Address of Principal Executive Offices)

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F:

Form 20-F ¨ Form<br> 40-F þ

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): ¨

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): ¨

Exhibit 99.1 to this report, furnished on Form 6-K, is furnished, not filed, and will not be incorporated by reference into any registration statement filed by the registrant under the Securities Act of 1933, as amended.

EXHIBIT INDEX

99.1 A copy of the registrant’s News Release dated December 6, 2022.

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

Date: December 6, 2022

SKEENA RESOURCES LIMITED
By: /s/ Andrew MacRitchie
Andrew MacRitchie
Chief Financial Officer

Exhibit99.1

SkeenaEnhances 22 Zone with Newly Discovered Mineralization

Intersecting2.85 g/t AuEq over 16.56 metres


Vancouver,BC (December 6, 2022) Skeena Resources Limited (TSX: SKE, NYSE: SKE) (“Skeena” or the “Company”) is pleased to announce additional drilling results from the 22 Zone as part of the recently completed 2022 regional and near mine exploration campaigns at the Eskay Creek gold-silver Project (“Eskay Creek” or the “Project”) in the Golden Triangle of British Columbia. Analytical results and reference images are detailed in this release as well as on the Company’s website.

NewNear Pit 22 Zone Mineralization Discovered

As part of the 2022 exploratory drill program, the 22 Zone has been expanded to the southwest with recently discovered near surface mineralization highlighted by exploratory drill hole SK-22-1112, which intersected 1.86 g/t Au, 88.3 g/t Ag (2.85 g/t AuEq) over 16.56 m. Additional mineralization was encountered by drill hole SK-22-1113, averaging 1.83 g/t Au, 101.4 g/t Ag (2.96 g/t AuEq) over 9.90 m. These new intercepts remain open for expansion both down dip and along strike and this new mineralization is situated only a few metres outside the limits of the existing 2022 Feasibility Study ultimate pit shell.

AboutSkeena

Skeena Resources Limited is a Canadian mining exploration and development company focused on revitalizing the past-producing Eskay Creek gold-silver mine located in Tahltan Territory in the Golden Triangle of northwest British Columbia, Canada. The Company released a Feasibility Study for Eskay Creek in September 2022 which highlights an open-pit average grade of 4.00 g/t AuEq, an after-tax NPV5% of C$1.4B, 50% IRR, and a 1-year payback at US$1,700/oz Au and US$19/oz Ag. Skeena is currently continuing exploration drilling at Eskay Creek.

On behalf of the Board of Directors of Skeena Resources Limited,

Walter Coles Jr. Randy Reichert
Executive Chairman President & CEO

Contact Information

Investor Inquiries: info@skeenaresources.com

Office Phone: +1 604 684 8725

Company Website: www.skeenaresources.com


QualifiedPersons

Exploration activities at the Eskay Creek Project are administered on site by the Company’s Exploration Managers, Raegan Markel, P.Geo. and Director of Exploration, Adrian Newton P.Geo. In accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects, Paul Geddes, P.Geo. Senior Vice President Exploration and Resource Development, is the Qualified Person for the Company and has prepared, validated and approved the technical and scientific content of this news release. The Company strictly adheres to CIM Best Practices Guidelines in conducting, documenting, and reporting the exploration activities on its projects.

QualityAssurance – Quality Control

Once received from the drill and processed, all drill core samples are sawn in half, labelled and bagged. The remaining drill core is subsequently securely stored on site. Numbered security tags are applied to lab shipments for chain of custody requirements. The Company inserts quality control (QC) samples at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. The QAQC program was designed and approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd., and is overseen by the Company’s Qualified Person, Paul Geddes, P.Geo, Vice President Exploration and Resource Development.

Drill core samples are submitted to ALS Geochemistry’s analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed and 1 kg is pulverized. Analysis for gold is by 50 g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed using a 50 g fire assay fusion with gravimetric finish. Analysis for silver is by 50 g fire assay fusion with gravimetric finish with a lower limit of 5ppm and upper limit of 10,000 ppm. Samples with silver assays greater than 10,000 ppm are re-analyzed using a gravimetric silver concentrate method. A selected number of samples are also analyzed using a 48 multi-element geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS) and also for mercury using an aqua regia digest with Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) finish. Samples with sulfur reporting greater than 10% from the multi-element analysis are re-analyzed for total sulfur by Leco furnace and infrared spectroscopy.


Cautionarynote regarding forward-looking statements


Certain statements and information contained or incorporated by reference in this news release constitute “forward-looking information” and “forward-looking statements” within the meaning of applicable Canadian and United States securities legislation (collectively, “forward-looking statements”). These statements relate to future events or our future performance. The use of words such as “anticipates”, “believes”, “proposes”, “contemplates”, “generates”, “targets”, “is projected”, “is planned”, “considers”, “estimates”, “expects”, “is expected”, “potential” and similar expressions, or statements that certain actions, events or results “may”, “might”, “will”, “could”, or “would” be taken, achieved, or occur, may identify forward-looking statements. All statements other than statements of historical fact are forward-looking statements. Specific forward-looking statements contained herein include, but are not limited to, statements regarding the results of the Feasibility Study, processing capacity of the mine, anticipated mine life, probable reserves, estimated project capital and operating costs, sustaining costs, results of test work and studies, planned environmental assessments, the future price of metals, metal concentrate, and future exploration and development. Such forward-looking statements are based on material factors and/or assumptions which include, but are not limited to, the estimation of mineral resources and reserves, the realization of resource and reserve estimates, metal prices, taxation, the estimation, timing and amount of future exploration and development, capital and operating costs, the availability of financing, the receipt of regulatory approvals, environmental risks, title disputes and the assumptions set forth herein and in the Company’s MD&A for the year ended December 31, 2021, its most recently filed interim MD&A, and the Company’s Annual Information Form (“AIF”) dated March 31, 2022. Such forward-looking statements represent the Company’s management expectations, estimates and projections regarding future events or circumstances on the date the statements are made, and are necessarily based on several estimates and assumptions that, while considered reasonable by the Company as of the date hereof, are not guarantees of future performance. Actual events and results may differ materially from those described herein, and are subject to significant operational, business, economic, and regulatory risks and uncertainties. The risks and uncertainties that may affect the forward-looking statements in this news release include, among others: the inherent risks involved in exploration and development of mineral properties, including permitting and other government approvals; changes in economic conditions, including changes in the price of gold and other key variables; changes in mine plans and other factors, including accidents, equipment breakdown, bad weather and other project execution delays, many of which are beyond the control of the Company; environmental risks and unanticipated reclamation expenses; and other risk factors identified in the Company’s MD&A for the year ended December 31, 2021, its most recently filed interim MD&A, the AIF dated March 31, 2022, the base shelf prospectus dated November 11, 2020, the prospectus supplement to the Company’s base shelf prospectus dated September 20, 2022 and in the Company’s other periodic filings with securities and regulatory authorities in Canada and the United States that are available on SEDAR at www.sedar.com or on EDGAR at www.sec.gov.

Readers should not place undue reliance on such forward-looking statements. Any forward-looking statement speaks only as of the date on which it is made and the Company does not undertake any obligations to update and/or revise any forward-looking statements except as required by applicable securities laws.

Cautionarynote to U.S. Investors concerning estimates of mineral reserves and mineral resources


Skeena’s mineral reserves and mineral resources included or incorporated by reference herein have been estimated in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) as required by Canadian securities regulatory authorities, which differ from the requirements of U.S. securities laws. The terms “mineral reserve”, “proven mineral reserve”, “probable mineral reserve”, “mineral resource”, “measured mineral resource”, “indicated mineral resource” and “inferred mineral resource” are Canadian mining terms as defined in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) “CIM Definition Standards – For Mineral Resources and Mineral Reserves” adopted by the CIM Council (as amended, the “CIM Definition Standards”). These standards differ significantly from the mineral property disclosure requirements of the U.S. Securities and Exchange Commission in Regulation S-K Subpart 1300 (the “SEC Modernization Rules”). Skeena is not currently subject to the SEC Modernization Rules. Accordingly, Skeena’s disclosure of mineralization and other technical information may differ significantly from the information that would be disclosed had Skeena prepared the information under the standards adopted under the SEC Modernization Rules.

In addition, investors are cautioned not to assume that any part or all of Skeena’s mineral resources constitute or will be converted into reserves. These terms have a great amount of uncertainty as to their economic and legal feasibility. Accordingly, investors are cautioned not to assume that any “measured”, “indicated”, or “inferred” mineral resources that Skeena reports are or will be economically or legally mineable. Further, “inferred mineral resources” have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an “inferred mineral resource” will ever be upgraded to a higher category. Under Canadian securities laws, estimates of “inferred mineral resources” may not form the basis of feasibility or prefeasibility studies, except in rare cases where permitted under NI 43-101.

For these reasons, the mineral reserve and mineral resource estimates and related information presented herein may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the U.S. federal securities laws and the rules and regulations thereunder.

Table1: Eskay Creek Project 2022 Exploratory Drilling Campaign Length-Weighted Drill Hole Composites:

Hole-ID From (m) To (m) Sample Length (m) Au (g/t) Ag (g/t) AuEq (g/t)
SK-22-1112 32.44 49.00 16.56 1.86 88.3 2.85
SK-22-1112 63.00 67.50 4.50 0.36 24.7 0.64
SK-22-1112 81.00 82.50 1.50 0.38 18.5 0.59
SK-22-1112 135.00 136.50 1.50 0.07 49.0 0.61
SK-22-1112 144.00 145.50 1.50 0.15 39.0 0.58
SK-22-1112 182.00 188.50 6.50 0.53 15.9 0.71
SK-22-1112 194.50 196.00 1.50 0.51 7.3 0.59
SK-22-1112 200.00 209.00 9.00 0.31 108.4 1.51
SK-22-1112 219.50 222.50 3.00 0.73 8.6 0.82
SK-22-1112 227.00 231.50 4.50 0.34 31.7 0.69
SK-22-1112 241.00 244.00 3.00 0.56 16.0 0.74
SK-22-1113 25.00 27.00 2.00 0.47 4.9 0.53
SK-22-1113 49.00 51.50 2.50 0.62 19.5 0.83
SK-22-1113 58.60 68.50 9.90 1.83 101.4 2.96
SK-22-1113 79.50 81.00 1.50 0.76 1.0 0.77
SK-22-1113 175.00 175.57 0.57 0.66 1.6 0.68
SK-22-1113 180.50 184.00 3.50 0.41 0.5 0.41
SK-22-1113 189.50 190.57 1.07 0.72 2.4 0.75

Gold Equivalent (AuEq) calculated via the formula: Au (g/t) + [Ag (g/t) / 90]. True widths and zone geometries cannot be definitively determined at this time. Grade-capping of individual assays has not been applied to the Au and Ag assays informing the length-weighted AuEq composites. Metallurgical processing recoveries have not been applied to the AuEq calculation and are taken at 100%. Samples below detection limit were nulled to a value of zero.


Table2: Mine Grid Drill Hole Locations and Orientations:

Hole-ID Easting (m) Northing (m) Elevation (m) Length (m) Azimuth (°) Dip (°)
SK-22-1112 9540.5 8537.8 1101.4 259.5 51.9 -65.0
SK-22-1113 9542.3 8536.2 1100.6 227.7 72.0 -50.0