6-K
Cadeler A/S (CDLR)
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TORULE 13A-16 OR 15D-16 OF THE
SECURITIES EXCHANGE ACT OF 1934
For the month of November 2025
Commission File Number: 001-41889
CADELER A/S
(Translation of registrant's name into English)
Kalvebod Brygge 43
DK-1560 Copenhagen V, Denmark
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
Form 20-F x Form 40-F ¨
INFORMATION CONTAINED IN THIS FORM 6-K REPORT
On November 20, 2025, members of the executive management of Cadeler A/S (the “Company”) delivered the investor presentation attached hereto as Exhibit 99.1 in connection with the release of the Company’s financial results as of and for the nine months ended September 30, 2025.
| Exhibit No. | Description |
|---|---|
| 99.1 | Investor Presentation Q3 2025 dated November 20, 2025. |
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
| Date: November 20, 2025 | CADELER A/S | |
|---|---|---|
| (Registrant) | ||
| By: | /s/ Mikkel Gleerup | |
| Name: | Mikkel Gleerup | |
| Title: | Chief Executive Officer |
Exhibit 99.1
| Investor Presentation Q3 2025<br>1 July – 30 September 2025<br>Cadeler A/S. Incorporated in Denmark.<br>Registration Number (CVR no.): 3118 0503<br>Kalvebod Brygge 43, DK-1560 Copenhagen V, Denmark | ||
|---|---|---|
| Disclaimer<br> | 2<br>This presentation (this “Presentation") has been prepared by Cadeler A/S (the “Company") exclusively for information purposes and may not be reproduced or redistributed, in whole or in part, by any other person.<br>Forward-looking statements<br>This Presentation contains certain forward-looking statements within the meaning of Section 27A of the U.S. Securities Act of 1933 and Section 21E of the U.S. Exchange Act of 1934, each as amended. All statements<br>other than statements of historical fact included in this Presentation are forward-looking statements, including those regarding future guidance, such as those related to anticipated revenue, EBITDA and Adjusted<br>EBITDA. Forward looking statements involve risks, uncertainties and assumptions, and actual results may differ materially from any future results expressed or implied by such forward-looking statements. Words such<br>as "anticipate," "believe ," "continue," "could,“ "estimate," "expect," "intend," "may," "might,“ “forecast”, “on track,” "plan," “possible,” “potential,” “predict,” "project," "should," "would," "shall," “target,” "will" and similar<br>expressions are intended to assist in identifying forward looking statements. Although the Company believes that the expectations reflected in such forward-looking statements are reasonable, there can be no<br>assurance that such expectations will prove to be correct. All forward-looking statements included in this Presentation speak only as of the date of this Presentation and the Company undertakes no obligation to revise<br>or update any forward-looking statement for any reason, except as required by law. Risks and uncertainties include, but are not limited to, those detailed in the Company’s most recent annual report on Form 20-F and<br>in its other filings with the U.S. Securities and Exchange Commission. You should consider these risks and uncertainties when evaluating the Company and its prospects.<br>None of the Company or any of its parent or subsidiary undertakings or any of such persons’ directors, officers or employees provides any assurance that the assumptions reflected in the forward-looking statements<br>included in this Presentation are free from error nor does any of them accept any responsibility for the future accuracy of the opinions expressed in this Presentation or the actual occurrence of the forecasted<br>developments.<br>Non-IFRS performance measures<br>This Presentation includes certain Non-IFRS performance measures, including EBITDA, Adjusted EBITDA, and contract backlog. Such Non-IFRS performance measures are presented herein as the Company believes that<br>such measures provide investors with additional useful information and a means of understanding how the Company’s management evaluates the Company’s operating performance. Such performance measures<br>should not, however, be considered in isolation from, as substitutes for, or as superior to financial measures prepared in accordance with IFRS. Moreover, other companies may define Non-IFRS measures differently,<br>which limits the usefulness of these measures for the purpose of any comparison with such other companies.<br>Industry and market data<br>Information contained in this Presentation concerning the Company’s industry and the market in which it operates, including general expectations about its industry, market position, market opportunity and market<br>size, is based on data from various sources including internal data and estimates as well as third party sources such as independent industry publications, government publications, and reports by market research firms<br>or other published independent sources. You are cautioned not to give undue weight to such information. You are further advised that any third-party information referred to in this Presentation has not been prepared<br>specifically for inclusion in this Presentation and while the Company believes such information to be generally reliable, it has not undertaken any independent investigation to confirm the accuracy or completeness of<br>such information or to verify that more recent information is not available. | |
| --- | ||
| aa<br>Q3 2025 Highlights<br>Financial performance<br>in line with<br>expectations.<br>Three out of four<br>newbuilds<br>scheduled for<br>delivery in 2025<br>have been<br>delivered,<br>remaining 2025<br>newbuild (Wind<br>Mover) on track for<br>delivery ahead of<br>schedule.<br>Very strong utilisation in Q3<br>with seven vessels operating<br>across the world<br>(US, North Sea, APAC).<br>Continued strength in<br>execution, with Wind Ally<br>mission equipment mobilisation<br>and Wind Keeper upgrades<br>proceeding in parallel.<br> | 3<br>Third full-scope<br>foundation project<br>signed, as well as<br>two WTG T&I<br>contracts. | |
| --- | ||
| Commercial<br>highlights<br>Q3 2025<br> | 4 | |
| --- | ||
| Executing on projects<br>Vessel activity in Q3 2025<br>Wind Orca Wind Osprey Wind Scylla Wind Zaratan<br>Continue to work on the He Dreiht<br>installation project for Vestas and<br>will continue throughout 2025.<br>Completed two O&M campaigns<br>for Vestas, along with a<br>comprehensive drydock work scope<br>at Fayard, before commencing an<br>installation project for Baltic<br>Power.<br>Continues to work on the Revolution<br>Wind installation project for<br>Ørsted in the United States.<br>Completed an O&M campaign for<br>Vestas at the Changfang and<br>Xidao wind farm in Taiwan in<br>October 2025 and will now undertake<br>some planned maintenance work<br>scopes.<br>Wind Peak<br>Wind Maker Wind Pace<br>Delivered in March 2025 in China.<br>Transited to Ferrol, Spain for<br>mobilisation, and thereafter to the<br>United States to commence an O&M<br>campaign for GE Vernova.<br>Wind Keeper<br>Delivered in July 2025 and is<br>currently undertaking a complex<br>upgrade and simultaneous project<br>mobilisation at Fayard in Denmark,<br>before commencing her first project<br>in Q1, 2026.<br>Continues to work on an O&M<br>campaign for GE Vernova in United<br>States and will continue throughout<br>2025.<br>Continues to work on the Sofia<br>installation project for Siemens<br>Gamesa and will continue throughout<br>2025.<br>Wind Ally<br>Delivered in August 2025 and transited to<br>Huisman’s yard in Xiamen, China, to<br>install the mission equipment for the<br>Hornsea 3 Foundation installation<br>project. Once completed, Wind Ally will<br>begin the transit to Europe late 2025.<br> | 5 | |
| --- | ||
| Significant backlog across key markets<br>A 2.9bn backlog provides solid earnings visibility<br>Europe<br>APAC<br>Undisclosed client<br>WTG – 2027<br>North America<br>Revolution Wind<br>– WTG – 2025<br>He Dreiht<br>WTG – 2025<br>Baltic Power<br>WTG – 2025<br>Sofia<br>WTG – 2025<br>EA III<br>WTG – 2026<br>HOW III<br>FOU & WTG – 2026<br>Orsted/PGE<br>WTG – 2027<br>Inch Cape<br>WTG – 2026<br>EA II<br>FOU & WTG – 2027<br>Bałtyk II & III<br>WTG – 2027<br>Greater Changhua<br>WTG – 2025<br>O&M – 2025<br>Sunrise Wind<br>WTG – 2026<br>Undisclosed client<br>O&M – 2025<br>O&M – 2025<br>O&M + WTG –<br>2026<br>Formosa 4<br>WTG – 2028<br>US projects<br>contribute to ~7%<br>of total backlog<br>BC-Wind<br>WTG – 2028<br>Undisclosed client<br>FOU & WTG – 2029<br>Vessel Reservation Agreements<br>(not in backlog)<br>Undisclosed client<br>WTG – 2028<br>Region as % of total backlog<br> | 6<br>84%<br>9%<br>7% | |
| --- | ||
| Contract backlog remains strong at EUR 2.9 Billion<br>Development in contract backlog FY 2022 – Q3 2025<br> | 7<br>1. Figures are for period-end, except that the contract backlog provided for Q3 2025 is as of 20 November 2025 (the date of this presentation).<br>2. Figures provided for FY 2022 and H1 2023 exclude the contribution to the contract backlog resulting from Cadeler’s business combination with Eneti Inc., completed in December 2023.<br>3. Contract backlog assumes 100% of counterparty options are exercised. Of the total contract backlog, EUR 2,033m represents firm contracted days and EUR 459m represents days subject to the exercise of counterparty options.<br>4. 78% of the contract backlog (an aggregate of EUR 2,262m) relates to projects for which the relevant counterparty has taken a positive final investment decision (FID).<br>5. Contract backlog excludes vessel reservation agreements.<br>New in Q3 2025<br>• In July, Cadeler signed a significant long-term contract with<br>Vestas, for a firm period of three years with additional options of<br>two and a half years in aggregate. The firm value of the contract<br>to Cadeler is approximately EUR 210m; if all options are<br>exercised, the contract is expected to be worth in excess of EUR<br>380m.<br>• In September, Cadeler signed a firm contract with Ocean Winds<br>for WTG installation at the BC-Wind Offshore Wind Farm in<br>Poland. The project, expected to commence in 2028 and to<br>continue for approximately 4 months, will be executed by one of<br>Cadeler's O-class vessels. The value of the contract to Cadeler is<br>estimated to be between EUR 49 and EUR 58 million.<br>• In November, Cadeler signed firm contracts with an undisclosed<br>client for full-scope foundation T&I and WTG installation at a<br>future offshore wind farm. The foundations campaign is set to<br>commence in early 2029 with an A-class vessel and the WTG<br>installation scope is to begin in early 2030 using an O-class<br>vessel, with completion of both scopes expected by late 2030.<br>The value of the contracts to Cadeler is estimated at EUR 500<br>million.<br>Development in contract backlog FY 2022 – Q3 2025<br>(EURm)<br>FY 2022 H1 2023 FY 2023 H1 2024 FY 2024 Q1 2025 H1 2025 Q3 2025<br>907<br>1,359<br>1,736<br>1,915<br>2,336<br>2,487<br>2,022<br>2,887<br>396<br>653<br>254<br>1,085<br>274<br>1,379<br>357<br>1,526<br>389<br>1,907<br>429<br>2,023<br>464<br>1,742<br>281<br>2,491<br>78%<br>of total<br>backlog has<br>reached FID<br>Options Firm<br> | 7 |
| --- | ||
| Progress on newbuilds<br> | 8<br>Vessel<br>Progress update<br>Expected delivery<br>% completion1<br>• Steel cutting completed in July 2024.<br>• Keel laying completed on the 12th of<br>August 2025.<br>• Welding of hull blocks is ongoing in the<br>dry dock.<br>• Launching planned for December 2025.<br>• Delivery planned for Q3 2026.<br>75%<br>Q3 2026<br>Wind Ace<br>• Steel cutting completed in July 2025.<br>• Fabrication of steel blocks is ongoing.<br>• Factory acceptance test of engines is<br>ongoing.<br>• Delivery planned for Q2 2027.<br>Q2 2027<br>Wind Apex<br>8%<br>Wind Mover<br>Q4 2025<br>• Launched 27 January 2025.<br>• Commissioning of main engines and<br>thrusters are completed.<br>• Reeving of main crane is completed.<br>• Sea trials completed.<br>• Delivery planned for Q4.<br>97%<br>Note: 1. The construction completion rate is measured in different ways at Cosco Qidong and Hanwha Ocean. Therefore, a direct comparison of completion rates across yards is not possible.<br> | 8 |
| --- | ||
| Wind Keeper arrives at Fayard on schedule<br>The vessel is undergoing various modifications to ensure that she lives up to Cadeler standards<br>and meets performance criteria set by us and our clients<br> | 9 | |
| --- | ||
| Financial<br>highlights<br>Q3 2025<br> | 10 | |
| --- | ||
| Financial highlights<br>Q3 2025<br>Market Capitalisation Revenue 2 Equity ratio Utilisation1<br>3-month Daily Average<br>Turnover4<br>EBITDA Cash Flow from Operating<br>Activities<br>Backlog3<br>€ 1.4b<br>€ 5.4m<br>€ 1.4m (NYSE) / 2.1m (OSE)<br>/ 1.8m (other exchanges)<br>1. Adjusted utilisation which means adjusted for planned off-hire including drydock and transportation from shipyard.<br>2. Combined market capitalisation at closing on 17-Nov-25.<br>3. The contract backlog provided for Q3 2025 is as of 20 November 2025 (the date of this presentation).<br>4. Three-month Average Daily Trading Volume (ADTV) multiplied by Volume Weighted Average Price (VWAP). All prices have been converted to euro using the daily exchange rate. The category “other” entails trades facilitated by the interoperability<br>among clearing corporations on different exchanges. No pricing data available for these transactions. The VWAP for OSE has been applied as a proxy.<br>€ 154.3m 47.3% 92.2%<br>Q3 2024 Q3 2025<br>86.5% 86.5% 91.5% 92.2%<br>Unadj. Adj.<br>€ 109.1m<br>Q3 2024 Q3 2025<br>48<br>109<br>€ 214.0m<br>Q3 2024 Q3 2025<br>27<br>214<br>Q3 2024 Q3 2025<br>2.1<br>2.9<br>€ 2.9b<br>Q3 2024 Q3 2025<br>62.0%<br>47.3%<br>Q3 2024 Q3 2025<br>81<br>154<br>Unadj. Adj.<br> | 11 | |
| --- | ||
| Key takeaways<br>• Revenue increased by EUR 74 m compared to Q3<br>2024, with both utilisation and adjusted utilisation at<br>92% in Q3 2025 (up from 86% in Q3 2024).<br>• Since utilisation for the comparable periods is equal,<br>the revenue increase is mainly due to addition of<br>three vessels in operation: Wind Maker, Wind Peak<br>and Wind Pace.<br>• Cost of sales increased primarily driven by newly<br>delivered vessels Wind Peak, Wind Maker and Wind<br>Pace becoming part of the Group’s fleet and not yet<br>delivered in Q3 2024**.<br>• SG&A costs higher due to increase in onshore staff.<br>Many of which related to more vessels on water and<br>their needed support to both ongoing operations<br>and new projects.<br>• EBITDA increase is driven by the increase in revenue<br>as explained above.<br> | 12<br>Note: Financials are unaudited.<br>* OPEX/day based on crewing costs, technical costs and insurance.<br>** Wind Peak was delivered mid Q3 2024.<br>Consolidated P&L for Q3 2025<br>EUR ‘000<br>Revenue<br>Cost of sales<br>Gross profit<br>SG&A and other expenses<br>Operating profit<br>Finance net<br>Profit before income tax<br>Income tax expense<br>Profit after tax<br>EBITDA<br>Vessel OPEX (EUR per day)*<br>No. of vessels<br>Q3 2025<br>154,250<br>(58,592)<br>95,658<br>(15,975)<br>79,683<br>(12,884)<br>66,799<br>(2,184)<br>64,615<br>109,052<br>38,398<br>8<br>Q3 2024<br>80,567<br>(33,098)<br>47,469<br>(14,265)<br>33,204<br>(5,047)<br>28,157<br>(494)<br>27,663<br>48,431<br>35,927<br>5 | |
| --- | ||
| Consolidated P&L for 9M 2025<br>Key takeaways<br>• Revenue increased by EUR 290m compared to YTD<br>Q3 2024 including the termination fees due to<br>cancellation of a long-term agreement. The<br>utilisation is at 76% and an adjusted utilisation of<br>90% for YTD 2025. In Q3 2024, YTD utilisation was<br>61%, as Wind Orca and Wind Osprey had their main<br>crane upgrades.<br>• Cost of sales increased primarily driven by newly<br>delivered vessels Wind Peak, Wind Maker, Wind Pace<br>and Wind Ally becoming part of the Group’s fleet<br>and not yet delivered in Q3 2024**.<br>• SG&A costs higher due to increase in onshore staff.<br>Many of which related to more vessels on water and<br>their needed support to both ongoing operations<br>and new projects.<br>• EBITDA increase is driven by the increase in revenue<br>as explained above.<br> | 13<br>Note: Financials are unaudited.<br>* OPEX/day based on crewing costs, technical costs and insurance.<br>** Wind Peak was delivered mid Q3 2024.<br>EUR ‘000<br>Revenue<br>Cost of sales<br>Gross profit<br>SG&A and other expenses<br>Operating profit<br>Finance net<br>Profit before income tax<br>Income tax expense<br>Profit after tax<br>EBITDA<br>Vessel OPEX (EUR per day)*<br>No. of vessels<br>Headcount onshore (Average)<br>9M 2025<br>452,785<br>(158,826)<br>293,959<br>(46,322)<br>247,637<br>(9,713)<br>237,924<br>(5,576)<br>232,348<br>321,568<br>34,616<br>8<br>295<br>9M 2024<br>162,785<br>(90,496)<br>72,289<br>(40,448)<br>31,841<br>(2,414)<br>29,427<br>(1,611)<br>27,816<br>70,158<br>35,738<br>5<br>236 | |
| --- | ||
| Key takeaways<br>• Total Assets increase of EUR 1,119m driven by the<br>newbuilds and cash available from financing<br>activities.<br>• Total Liabilities increased by EUR 907m due to the<br>utilisation of financing facilities, reducing the equity<br>ratio from 64% in FY 2024 to 47% in 9M 2025.<br> | 14<br>Note: Financials are unaudited.<br>Consolidated Balance Sheet for 9M 2025<br>EUR ‘000<br>Non-Current Assets<br>Cash<br>Other Current Assets<br>Total Assets<br>Equity<br>Non-current liabilities<br>Current liabilities<br>Total Equity and Liabilities<br>Equity ratio<br>9M 2025<br>2,660,552<br>217,757<br>177,753<br>3,056,062<br>1,445,990<br>1,238,831<br>371,241<br>3,056,062<br>47%<br>FY 2024<br>1,748,400<br>58,464<br>130,152<br>1,937,016<br>1,233,894<br>579,475<br>123,647<br>1,937,016<br>64% | |
| --- | ||
| 15<br>CAPEX program expected to be fully funded<br>Strong interest from banks to finance Cadeler’s CAPEX program<br>Cadeler's secured CAPEX and funding<br>EUR 2,165m in funding secured (incl. Wind Keeper, see next<br>page) of which EUR 1,455m is drawn as per 30 September<br>2025, i.e., EUR 710m still undrawn. Key takeaways are:<br>• A-class financing of EUR 525m for Wind Ally and Wind<br>Ace signed in March 2025 incl. EUR 70m in Mission<br>Equipment. A-class tranche of EUR 228m utilised in Q3<br>2025.<br>• M-class tranche of EUR 203m utilised in January 2025<br>related to Wind Maker delivery. Remaining facility<br>expected to be fully utilised upon delivery of Wind Mover<br>in Q4 2025.<br>• P-class tranche now fully utilised with delivery of the<br>second P-class vessel, Wind Pace, in March 2025.<br>• Wind Keeper Bridge facility repaid in full in October 2025<br>and funded by the new syndicated facility of EUR 125m<br>together with EUR 25m cash on hand.<br>Hedging<br>• 50% of USD exposure hedged.<br>• ~50% of interest exposure hedged for the first five years<br>of the expected facilities.<br>CAPEX program and planned Cadeler financing (EURm)<br>Note: Exchange rate of EUR/USD 1.1742 at 30/09-2025.<br>Signed / Committed<br>(excl. Wind Keeper)<br>M-Class Cash Total A-Class<br>Facility<br>M-Class Net<br>Funding<br>RCF-undrawn<br>Total<br>Financing<br>A-Class -<br>Wind Ace<br>& Ally<br>A-Class -<br>Wind APEX<br>80<br>208<br>297<br>240 825<br>218 1,043<br>382<br>208<br>227<br>70<br>240<br>218 (166)<br>(254)<br>(241)<br>EUR 585m<br>Additional CAPEX for<br>mission equipment is<br>expected at project start | ||
| --- | ||
| 16<br>Financing overview as of 30 September<br>1) Utilised as per 30/09-2025<br>Note: In addition, Cadeler has EUR 200m in uncommitted Performance Guarantee lines secured in the EUR 550m Facility and a EUR 50m uncommitted Performance Guarantee Facility with Allianz<br>All figures in EURm<br>Comitted<br>Financing<br>Uncomitted<br>Financing<br>Total<br>Vessels<br>O-class,<br>Scylla<br>& Zaratan<br>O-class, Scylla & Zaratan total<br>P-class<br>M-class<br>A-class<br>Wind Keeper<br>Wind Keeper<br>Corporate<br>Total commitment<br>Wind Apex<br>Total uncommitment<br>Facility<br>RCF-A<br>RCF-B<br>Term Loan<br>Syndicated<br>Syndicated<br>Syndicated<br>Bridge Facility<br>Syndicated<br>HSBC, Standard Chartered<br>Syndicated<br>Amount<br>250<br>100<br>84<br>434<br>395<br>411<br>525<br>150<br>125<br>125<br>2,165<br>240<br>240<br>2,405<br>Outstanding1<br>250<br>20<br>84<br>354<br>395<br>203<br>228<br>150<br>-<br>125<br>1,455<br>-<br>1,455<br>Comments<br>Extension of RCF B until September 2026 and<br>guarantee line increase to EUR 200m<br>Amortisation has been initiated<br>Take-out financing of EUR 125m signed<br>Financing expected to be closed 1 year before<br>delivery | ||
| --- | ||
| Full year outlook for 2025<br>FY 2025 impacted by:<br>• Termination fees due to cancellation of a long-term agreement.<br>• Timely vessel deliveries and execution on projects.<br>• Wind Maker and Wind Pace delivered in Q1 2025 and<br>employed in APAC and US during 2025. Wind Ally delivered in<br>Q3 2025. One additional vessel delivery in Q4 2025 (Wind<br>Mover) preparing for upcoming projects.<br>• Revenue and costs from Foundation projects starting to be<br>recognised (ramp-up).<br>EURm<br>Revenue<br>EBITDA<br>Q3 2025<br>Actuals<br>154<br>109<br>YTD 2025<br>Actuals<br>453<br>322<br>2025<br>Outlook<br>588-628<br>381-421<br> | 17 | |
| --- | ||
| Commercial<br>outlook<br> | 18 | |
| --- | ||
| Our view on the market<br>Recalibration is ongoing; strong demand momentum expected towards<br>the end of the decade<br>• Global demand is shifting to the right; current forecast is lower than expected<br>a year ago, however, we still expect significant outbuild<br>• Recalibration in the market continues. Last year has seen several failed auctions:<br>the timing of offshore wind outbuild in the near term is increasingly dependent<br>on a few key auctions (like UK AR7 and AR8). Consequently, various European<br>jurisdictions are adjusting their approaches to attract more bids and<br>actively working to increase the attractiveness of national auctions to regain<br>momentum<br>• Our long-term outlook remains strong; offshore wind is expected to play a<br>significant role in the future energy mix<br>• Strong end-of-decade momentum is expected resulting in vessel undersupply<br> | 19 | |
| --- | ||
| 20<br>90GW of added capacity is expected by 2031<br>Global (ex-China) demand forecasts are shifting to the right; we still expect significant outbuild by<br>2031<br>Cumulative Annual Additions in GW (fixed-bottom only) Key takeaways<br>• Over the last year, delays in projects, reduced or<br>failed auctions and political headwinds have caused<br>the demand curve to move to the right<br>• Main data providers have adjusted their demand<br>forecast to the right<br>• We are still seeing the same projects and markets in<br>demand, which is a significant increase, but the<br>previous spikes are being smoothed out over<br>several years<br>• Developed markets in Europe continue to drive<br>capacity additions, APAC expects accelerated build-out from the early 2030’s mainly driven by South<br>Korea and Japan<br>Source: Aegir, WoodMac, 4C, Spinergie<br>Aegir<br>WoodMac<br>Average<br>4C<br>Spinergie<br>0<br>30<br>60<br>90<br>120<br>2025 2026 2027 2028 2029 2030 2031 | ||
| --- | ||
| 21<br>The largest fleet of efficient vessels<br>Cadeler has the largest fleet of vessels capable of efficient installation of<br>wind turbines and foundations<br>Note: Selected players in the industry where an owned vessel either has a pipeline of installation work or will be a value driver in O&M work as estimated by management.<br>Source: 4C Offshore and public filings<br># of wind turbine and foundation installation vessels1<br>8<br>3<br>1<br>4<br>2 2<br>3<br>1<br>2 2<br>1 1 1<br>4<br>5<br>3 1 1<br>1<br>Maersk<br>12<br>8<br>4<br>3 3<br>2<br>Newbuilds since 2020<br>Legacy<br>World’s largest and most versatile fleet of<br>next generation offshore wind turbine and<br>foundation installation vessels.<br>Improved customer value proposition<br>through increased flexibility, ability to<br>meet demand and reduced risk of project<br>slippage. | ||
| --- | ||
| aa<br>Key investment highlights<br>Largest, most capable<br>and most versatile fleet<br>in the industry. Strong<br>complementarity in fleet<br>enables cross-utilisation, efficiency<br>and project derisking.<br>Highly experienced team<br>with a proven track<br>record, critical know-how<br>and long-standing deep<br>commercial<br>relationships and<br>contracts with the<br>industry’s leading<br>developers.<br>Resilient global platform<br>with project<br>experience and<br>presence in all major<br>offshore wind<br>markets.<br>Anticipated<br>undersupply of<br>capable vessels from<br>2029 and onwards,<br>due to significantly<br>increasing market<br>demand including<br>strong growth in<br>demand for O&M.<br>Strong track record in<br>the capital markets<br>backed by a record-high backlog (€2.9B)<br>providing earnings<br>visibility. Key focus on<br>being a good<br>custodian of capital.<br> | 22 | |
| --- | ||