Skip to main content

6-K

Korea Electric Power Corp (KEP)

6-K 2025-06-17 For: 2025-06-17
View Original
Added on April 11, 2026
Table of Contents

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 6-K

REPORT OF FOREIGN PRIVATE ISSUER

Pursuant to Rule 13a-16 or 15d-16 under

the Securities Exchange Act of 1934

For the Month of June 2025

Commission File Number 001-13372

KOREA ELECTRIC POWER CORPORATION

(Translation of registrant’s name into English)

55 Jeollyeok-ro, Naju-si,Jeollanam-do, 58322, Korea

(Address of principal executive offices)

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.

Form 20-F ☒    Form 40-F ☐

Table of Contents

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

By: /s/ Joo, Hwa-Sik
Name: Joo, Hwa-Sik
Title: Vice President

Date: June 17, 2025

Table of Contents

KOREA ELECTRIC POWER CORPORATION

AND ITS SUBSIDIARIES

Condensed consolidated interim financial statements

March 31, 2025

with the independent auditors’ review report

Table of Contents

TABLE OF CONTENTS

Page
Independent auditors’ review report
Consolidated interim statements of financial position 1
Consolidated interim statements of comprehensive income 3
Consolidated interim statements of changes in equity 5
Consolidated interim statements of cash flows 7
Notes to the consolidated interim financial statements 9
Table of Contents

LOGO

Independent Auditors’ Review Report

(English translation of a report originally issued in Korean)

To the Board of Directors and Shareholders of

Korea Electric Power Corporation

Reviewed Financial Statements

We have reviewed the accompanying condensed consolidated interim financial statements of Korea Electric Power Corporation and its subsidiaries (the “Group”), which comprise the condensed consolidated interim statement of financial position as of March 31, 2025, the condensed consolidated interim statements of comprehensive income, changes in equity and cash flows for the three-month period ended March 31, 2025 and notes, comprising of material accounting policy information and other explanatory information.

Management’s Responsibility

Management is responsible for the preparation and fair presentation of these condensed consolidated interim financial statements in accordance with Korean International Financial Reporting Standards (“K-IFRS”) No. 1034, ‘Interim Financial Reporting’ and for such internal control as management determines is necessary to enable the preparation of financial statements that are free from material misstatement, whether due to fraud or error.

Auditors’ Review Responsibility

Our responsibility is to issue a report on these condensed consolidated interim financial statements based on our review.

We conducted our review in accordance with the Review Standards for Quarterly and Semiannual Financial Statements established by the Securities and Futures Commission of the Republic of Korea. A review of interim financial statements consists of making inquiries, primarily of persons responsible for financial and accounting matters, and applying analytical and other review procedures. A review is substantially less in scope than an audit conducted in accordance with Korean Standards on Auditing and consequently does not enable us to obtain assurance that we would become aware of all significant matters that might be identified in an audit. Accordingly, we do not express an audit opinion.

Conclusion

Based on our review, nothing has come to our attention that causes us to believe that the accompanying condensed consolidated interim financial statements referred to above do not present fairly, in all material respects, in accordance with K-IFRS No. 1034, ‘Interim Financial Reporting’.

Other Matters

The procedures and practices utilized in the Republic of Korea to review such condensed consolidated interim financial statements may differ from those generally accepted and applied in other countries.

The condensed consolidated interim statements of comprehensive loss, change in equity and cash flows for the three-month period ended March 31, 2024, presented for comparative purposes, were reviewed by another auditor. The review report dated May 16, 2024, stated that nothing had come to their attention that caused them to believe that those consolidated interim financial statements did not present fairly, in all material respects, in accordance with K-IFRS No. 1034, ‘Interim Financial Reporting’.

The consolidated statement of financial position as of December 31, 2024, and the related consolidated statements of comprehensive income, changes in equity and cash flows for the year then ended, which are not accompanying this report, have been audited by another auditor in accordance with Korean Standards on Auditing and their report thereon, dated March 11, 2025, expressed an unmodified opinion. The accompanying consolidated statement of financial position as of December 31, 2024, presented for comparative purposes, is not different from that audited by another auditor from which it was derived in all material respects.

LOGO

Seoul, Korea

May 15, 2025

This report is effective as of May 15, 2025, the review report date. Certain subsequent events or circumstances, which may occur between the review report date and the time of reading this report, could have a material impact on the accompanying condensed consolidated interim financial statements and notes thereto. Accordingly, the readers of the review report should understand that the above review report has not been updated to reflect the impact of such subsequent events or circumstances, if any.

Table of Contents

KOREA ELECTRIC POWER CORPORATION

AND ITS SUBSIDIARIES

Consolidated interim financial statements

For each of the three-month periods ended March 31, 2025 and 2024

“The accompanying consolidated interim financial statements, including all footnotes and disclosures, have been prepared by, and are the responsibility of, the Group.”

Dong-Cheol Kim

Chief Executive Officer

Korea Electric Power Corporation

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Consolidated interim statements of financial position

As of March 31, 2025 and December 31, 2024 (Unaudited)

In millions of won Note March 31, 2025 December 31, 2024
Assets
Current assets
Cash and cash equivalents 5,6,7,44 ~~W~~ 2,442,980 2,382,979
Current financial assets, net 5,6,9,11,12,13,44,45,46 5,104,546 3,494,717
Trade and other receivables, net 5,8,20,24,44,45,46 11,279,269 12,216,216
Inventories, net 14 9,791,697 9,769,236
Current income tax assets 95,617 78,495
Current non-financial assets 15 1,286,914 1,267,914
Assets held-for-sale 41 28,868 45,648
Total current assets 30,029,891 29,255,205
Non-current assets
Non-current financial assets, net 5,6,9,10,11,12,13,44,46 4,714,821 4,945,990
Non-current trade and other receivables, net 5,8,20,44,45,46 3,089,051 3,157,409
Property, plant and equipment, net 18,24,27,48 183,845,454 182,982,763
Investment properties, net 19,27 216,988 228,984
Goodwill 16 99,247 99,179
Intangible assets other than goodwill, net 21,27 1,056,423 1,046,918
Investments in associates 4,17 6,840,066 6,704,754
Investments in joint ventures 4,17 6,345,101 4,581,340
Defined benefit assets, net 25 21,606 40,425
Deferred tax assets 13,301,165 13,436,624
Non-current non-financial assets 15 353,284 328,204
Total non-current assets 219,883,206 217,552,590
Total assets 4 ~~W~~ 249,913,097 246,807,795

(Continued)

1

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Consolidated interim statements of financial position, Continued

As of March 31, 2025 and December 31, 2024 (Unaudited)

In millions of won Note March 31, 2025 December 31, 2024
Liabilities
Current liabilities
Trade and other payables 5,22,24,44,46 ~~W~~ 8,526,811 9,411,315
Current financial liabilities 5,12,23,44,46 43,521,189 44,465,866
Current income tax liabilities 1,210,192 970,496
Current non-financial liabilities 20,28,29 7,027,883 6,327,141
Current provisions 26,44 3,138,495 2,793,971
Total current liabilities 63,424,570 63,968,789
Non-current liabilities
Non-current trade and other payables 5,22,24,44,46 4,500,784 4,609,241
Non-current financial liabilities 5,12,23,44,46 89,994,826 88,352,359
Non-current non-financial liabilities 28,29 13,471,514 13,281,520
Employee benefits liabilities, net 25,44 1,600,749 1,451,547
Deferred tax liabilities 5,849,674 5,944,472
Non-current provisions 26,44 27,959,858 27,837,034
Total non-current liabilities 143,377,405 141,476,173
Total liabilities 4 ~~W~~ 206,801,975 205,444,962
Equity
Contributed capital 1,30,44
Share capital ~~W~~ 3,209,820 3,209,820
Share premium 843,758 843,758
4,053,578 4,053,578
Retained earnings 31
Legal reserves 1,604,910 1,604,910
Voluntary reserves 567,469
Unappropriated retained earnings 20,052,687 18,523,337
22,225,066 20,128,247
Other components of equity 33
Other capital surplus 1,601,138 1,600,812
Accumulated other comprehensive income 1,368,224 1,424,014
Other equity 12,708,585 12,708,585
15,677,947 15,733,411
Equity attributable to owners of the controlling company 41,956,591 39,915,236
Non-controlling interests 16,32 1,154,531 1,447,597
Total equity ~~W~~ 43,111,122 41,362,833
Total liabilities and equity ~~W~~ 249,913,097 246,807,795

The accompanying notes are an integral part of the consolidated interim financial statements.

2

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Consolidated interim statements of comprehensive income

For the three-month periods ended March 31, 2025 and 2024 (Unaudited)

In millions of won, except per share information Note March 31, 2025 March 31, 2024
Sales 4,34,44,46
Sales of goods 2 ~~W~~ 23,809,449 22,850,748
Sales of services 146,692 167,700
Sales of construction services 20 56,197 85,506
Revenue related to transfer of assets from customers 28 211,646 188,789
24,223,984 23,292,743
Cost of sales 14,25,42,46
Cost of sales of goods (19,195,043 ) (21,045,353 )
Cost of sales of services (141,105 ) (127,530 )
Cost of sales of construction services (420,796 ) (130,304 )
(19,756,944 ) (21,303,187 )
Gross profit 4,467,040 1,989,556
Selling and administrative expenses 25,35,42,46 (713,433 ) (690,213 )
Operating profit 4 3,753,607 1,299,343
Other income 36 92,807 125,394
Other expenses 36 (19,878 ) (102,516 )
Other gains, net 37 98,572 25,064
Finance income 5,12,38 413,301 987,226
Finance expenses 5,12,39 (1,231,655 ) (2,001,253 )
Profit (loss) related to associates, joint ventures and subsidiaries 4,16,17
Gain on valuation of investments in associates and joint ventures 318,456 298,870
Gain on disposal of investments in associates and joint ventures 41 185,339
Loss on valuation of investments in associates and joint ventures (193,377 ) (79,682 )
125,120 404,527
Profit before income tax 3,231,874 737,785
Income tax expense 40 (870,166 ) (141,850 )
Profit for the period ~~W~~ 2,361,708 595,935

(Continued)

3

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Consolidated interim statements of comprehensive income, Continued

For the three-month periods ended March 31, 2025 and 2024 (Unaudited)

In millions of won, except per share information Note March 31, 2025 March 31, 2024
Other comprehensive income (loss), net of tax 5,12,25,31,33
Items that will not be reclassified subsequently to profit or loss:
Remeasurement of defined benefit plans 25,31 ~~W~~ (100,137 ) (33,665 )
Share in other comprehensive income (loss) of associates and joint ventures 31 (248 ) 635
Net change in fair value of equity investments at fair value through other comprehensive income<br>(loss) 33 (39,754 ) 66,174
Items that are or may be reclassified subsequently to profit or loss:
Net change in the unrealized fair value of derivatives using cash flow hedge accounting 5,12,33 10,463 1,501
Foreign currency translation of foreign operations 33 24,557 35,109
Share in other comprehensive income (loss) of associates and joint ventures 33 (52,419 ) 249,513
Other comprehensive income (loss) for the period (157,538 ) 319,267
Total comprehensive income for the period ~~W~~ 2,204,170 915,202
Profit attributable to:
Owners of the controlling company 43 ~~W~~ 2,328,246 561,462
Non-controlling interests 33,462 34,473
~~W~~ 2,361,708 595,935
Total comprehensive income attributable to:
Owners of the controlling company ~~W~~ 2,177,767 857,341
Non-controlling interests 26,403 57,861
~~W~~ 2,204,170 915,202
Earnings per share (in won) 43
Basic and diluted earnings per share ~~W~~ 3,627 875

The accompanying notes are an integral part of the consolidated interim financial statements.

4

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Consolidated interim statements of changes in equity

For the three-month periods ended March 31, 2025 and 2024 (Unaudited)

In millions of won Equity attributable to owners of the controlling company Non-<br>controlling<br>interests
Contributedcapital Retained<br>earnings Other<br>components<br>of equity Subtotal Total<br>equity
Balance as of January 1, 2024 ~~W~~ 4,053,578 16,338,262 15,453,203 35,845,043 1,419,707 37,264,750
Total comprehensive income (loss) for the period
Profit for the period 561,462 561,462 34,473 595,935
Items that will not be reclassified subsequently to profit or loss:
Remeasurement of defined benefit plans, net of tax (35,182 ) (35,182 ) 1,517 (33,665 )
Share of other comprehensive income of associates and joint ventures, net of tax 635 635 635
Net change in fair value of financial assets at fair value through other comprehensive income, net<br>of tax 66,173 66,173 1 66,174
Items that may be reclassified subsequently to profit or loss:
Net change in the unrealized fair value of derivatives using cash flow hedge accounting, net of<br>tax 1,089 1,089 412 1,501
Foreign currency translation of foreign operations, net of tax 13,651 13,651 21,458 35,109
Share of other comprehensive income of associates and joint ventures, net of tax 249,513 249,513 249,513
Transactions with owners of the Group, recognized directly in equity
Dividends paid (57,926 ) (57,926 )
Additional paid-in capital and others (5,296 ) (5,296 )
Transactions between consolidated entities 29 29 29
Dividends paid for hybrid bonds (2,553 ) (2,553 )
Others
Transfer of revaluation reserve 586,394 (586,394 )
Balance as of March 31, 2024 ~~W~~ 4,053,578 17,451,571 15,197,264 36,702,413 1,411,793 38,114,206

(Continued)

5

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Consolidated interim statements of changes in equity, Continued

For the three-month periods ended March 31, 2025 and 2024 (Unaudited)

In millions of won Equity attributable to owners of the controlling company Non-<br>controlling<br>interests
Contributedcapital Retained<br>earnings Other<br>components<br>of equity Subtotal Total<br>equity
Balance as of January 1, 2025 ~~W~~ 4,053,578 20,128,247 15,733,411 39,915,236 1,447,597 41,362,833
Total comprehensive income (loss) for the period
Profit for the period 2,328,246 2,328,246 33,462 2,361,708
Items that will not be reclassified subsequently to profit or loss:
Remeasurement of defined benefit plans, net of tax (94,441 ) (94,441 ) (5,696 ) (100,137 )
Share of other comprehensive loss of associates and joint ventures, net of tax (248 ) (248 ) (248 )
Net change in fair value of financial assets at fair value through other comprehensive loss, net<br>of tax (39,752 ) (39,752 ) (2 ) (39,754 )
Items that may be reclassified subsequently to profit or loss:
Net change in the unrealized fair value of derivatives using cash flow hedge accounting, net of<br>tax 11,230 11,230 (767 ) 10,463
Foreign currency translation of foreign operations, net of tax 25,151 25,151 (594 ) 24,557
Share of other comprehensive loss of associates and joint ventures, net of tax (52,419 ) (52,419 ) (52,419 )
Transactions with owners of the Group, recognized directly in equity
Dividends paid (136,738 ) (136,738 ) (74,241 ) (210,979 )
Additional paid-in capital and others 245 245 (5,960 ) (5,715 )
Transactions between consolidated entities 81 81 (7,140 ) (7,059 )
Dividends paid for hybrid bonds (2,128 ) (2,128 )
Repayment of hybrid bond (230,000 ) (230,000 )
Balance as of March 31, 2025 ~~W~~ 4,053,578 22,225,066 15,677,947 41,956,591 1,154,531 43,111,122

The accompanying notes are an integral part of the consolidated interim financial statements.

6

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Consolidated interim statements of cash flows

For the three-month periods ended March 31, 2025 and 2024 (Unaudited)

In millions of won March 31, 2025 March 31, 2024
Cash flows from operating activities
Profit for the period ~~W~~ 2,361,708 595,935
Adjustments to reconcile profit for the period to net cash provided by operating<br>activities:
Income tax expense 870,166 141,850
Depreciation 3,493,162 3,512,295
Amortization 40,299 40,504
Retirement benefit expenses 112,443 101,376
Bad debt expense 10,875 12,721
Interest expense 1,117,124 1,151,729
Loss on disposal of financial assets 735 27
Loss on disposal of property, plant and equipment 37,158 17,983
Loss on abandonment of property, plant and equipment 34,971 37,646
Loss on disposal of intangible assets 13 110
Increase in provisions, net 762,929 484,318
Loss (gain) on foreign currency translation, net (26,487 ) 733,108
Gain on valuation of financial assets at fair value through profit or loss (14,609 ) (36,671 )
Loss on valuation of financial assets at fair value through profit or loss 215 238
Gain on valuation and transaction of derivative instruments, net (81,689 ) (710,682 )
Gain on valuation of investments in associates and joint ventures, net (125,079 ) (219,188 )
Gain on disposal of financial assets (10,564 ) (8,108 )
Gain on disposal of property, plant and equipment (5,363 ) (34,053 )
Gain on disposal of intangible assets (11 )
Gain on disposal of associates and joint ventures (41 ) (185,339 )
Interest income (111,988 ) (118,441 )
Dividends income (13,551 ) (78 )
Others, net (104,736 ) 8,642
5,985,983 4,929,976
Changes in:
Trade receivables 1,069,490 1,375,173
Non-trade receivables (134,013 ) (176,741 )
Accrued income 69,228 (82,997 )
Other receivables 30,026 25,851
Other current assets (382,332 ) (211,654 )
Inventories (456,199 ) (206,012 )
Other non-current assets (98,859 ) (14,620 )
Trade payables (675,647 ) 213,202
Non-trade payables 47,840 508,405
Accrued expenses (99,797 ) (281,804 )
Other current liabilities 799,853 709,886
Other non-current liabilities 260,656 124,094
Investments in associates and joint ventures (dividends received) 38,623 72,620
Provisions (325,163 ) (218,046 )
Payments of employee benefit obligations (103,229 ) (28,549 )
Plan assets (5 ) (180 )
~~W~~ 40,472 1,808,628

(Continued)

7

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Consolidated interim statements of cash flows, Continued

For the three-month periods ended March 31, 2025 and 2024 (Unaudited)

In millions of won March 31, 2025 March 31, 2024
Cash generated from operating activities ~~W~~ 8,388,163 7,334,539
Dividends received 13,508 78
Interest paid (1,184,055 ) (1,130,112 )
Interest received 81,476 85,509
Income taxes paid (545,998 ) (57,495 )
Net cash flows provided by operating activities 6,753,094 6,232,519
Cash flows from investing activities
Proceeds from disposals of investments in associates and joint ventures 12,086 199,718
Acquisition of investments in associates and joint ventures (1,934,522 ) (130,524 )
Proceeds from disposals of property, plant and equipment 58,494 120,728
Acquisition of property, plant and equipment (3,772,784 ) (3,709,684 )
Proceeds from disposals of intangible assets 498 341
Acquisition of intangible assets (19,232 ) (21,460 )
Proceeds from disposals of financial assets 2,676,313 1,690,588
Acquisition of financial assets (4,134,278 ) (1,733,010 )
Increase in loans (46,357 ) (37,155 )
Collection of loans 139,380 70,040
Increase in deposits (41,850 ) (56,981 )
Decrease in deposits 39,198 49,169
Proceeds from disposals of assets held-for-sale 14,363
Receipt of government grants 4,954 11,564
Other cash outflow from investing activities, net (52,128 ) (79,289 )
Net cash flows used in investing activities (7,055,865 ) (3,625,955 )
Cash flows from financing activities
Repayment of short-term borrowings, net (203,040 ) (4,157,627 )
Proceeds from long-term borrowings 461,841 480,151
Proceeds from debt securities 8,481,212 2,748,184
Repayment of long-term borrowings (51,929 ) (61,909 )
Repayment of debt securities (7,942,524 ) (2,959,450 )
Payment of lease liabilities (188,632 ) (184,957 )
Settlement of derivative instruments, net 46,860 106,862
Change in non-controlling interests (11,133 ) (331 )
Repayment of hybrid bond (230,000 )
Dividends paid for hybrid bond (2,128 ) (2,553 )
Net cash flows provided by (used in) financing activities 360,527 (4,031,630 )
Net increase (decrease) in cash and cash equivalents before effect of exchange ratefluctuations 57,756 (1,425,066 )
Effect of exchange rate fluctuations on cash held 2,245 32,519
Net increase (decrease) in cash and cash equivalents 60,001 (1,392,547 )
Cash and cash equivalents as of January 1, 2025 and 2024 2,382,979 4,342,887
Cash and cash equivalents as of March 31, 2025 and 2024 ~~W~~ 2,442,980 2,950,340

The accompanying notes are an integral part of the consolidated interim financial statements.

8

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements

March 31, 2025 and 2024 (unaudited)

1. Reporting Entity (Description of the controlling company)

Korea Electric Power Corporation (“KEPCO”), the controlling company as defined in International Financial Reporting Standards as adopted by the Republic of Korea (“KIFRS”) 1110 Consolidated Financial Statements, was incorporated on January 1, 1982 in accordance with the Korea Electric Power Corporation Act (the “KEPCO Act”) to engage in the generation, transmission and distribution of electricity and development of electric power resources in the Republic of Korea. KEPCO’s stock was listed on the Korea Stock Exchange on August 10, 1989 and KEPCO listed its Depository Receipts (DR) on the New York Stock Exchange on October 27, 1994. KEPCO’s head office is located in Naju, Jeollanam-do.

As of March 31, 2025, KEPCO’s share capital amounts to ~~W~~3,209,820 million and KEPCO’s shareholders are as follows:

Number of shares<br>(in shares) Percentage of<br>ownership
The Government of the Republic of Korea 116,841,794 18.20 %
Korea Development Bank 211,235,264 32.90 %
Other (*) 313,887,019 48.90 %
641,964,077 100.00 %
(*) The number of shares held by foreign shareholders is 97,414,248 shares (15.17%) as of December 31,<br>2024, the most recent closing date of the shareholder list.
--- ---

In accordance with the Restructuring Plan enacted on January 21, 1999 by the Ministry of Trade, Industry and Energy, KEPCO spun off its power generation divisions on April 2, 2001, resulting in the establishment of six power generation subsidiaries.

2. Basis of Preparation
(1) Statement of compliance
--- ---

These consolidated interim financial statements have been prepared in accordance with KIFRS 1034 Interim Financial Reporting, enacted by the Act on External Audits of Stock Companies in the Republic of Korea. The accompanying consolidated interim financial statements have been translated into English from the Korean language financial statements. In the event of any differences in interpreting the financial statements or the independent auditors’ review report thereon, the Korean version, which is used for regulatory reporting purposes, shall prevail.

(2) Basis of measurement

These consolidated financial statements have been prepared on the historical cost basis, except for the following material items in the consolidated statements of financial position:

financial instruments at fair value through profit or loss;
financial instruments at fair value through other comprehensive income or loss;
--- ---
derivative financial instruments are measured at fair value; and
--- ---
liabilities for defined benefit plans are recognized at the net of the total present value of defined benefit<br>obligations less the fair value of plan assets.
--- ---
(3) Functional and presentation currency
--- ---

These consolidated financial statements are presented in Korean won (presented as “won” or “KRW”), which is also the functional currency of KEPCO and most of the significant operating subsidiaries.

9

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

2. Basis of Preparation, Continued
(4) Use of estimates and judgments
--- ---

The preparation of the consolidated financial statements in conformity with KIFRS requires management to make judgments, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets, liabilities, income and expenses. Actual results may differ from these estimates.

Estimates and underlying assumptions are reviewed on an ongoing basis. Revisions to accounting estimates are recognized in the period in which the estimates are revised and in any future periods affected.

Meanwhile, the Group considers climate-related risks resulting from climate change and the establishment of a global greenhouse gas reduction implementation system in its estimates and assumptions. Climate-related risks increase the uncertainty of the estimates and assumptions considered in various items of the financial statements, and the Group carefully monitors climate-related changes and developments, such as new climate-related legislation, even if it does not have a material impact on current measurements.

The followings are the key assumptions and other key sources of estimation uncertainty at the end of the reporting period, which have a significant risk of causing a material adjustment to the carrying amounts of assets and liabilities within the next financial year.

(i) Useful lives of property, plant and equipment, intangible assets other than goodwill and estimations on<br>provision for decommissioning costs.

The Group reviews the estimated useful lives of property, plant and equipment, intangible assets other than goodwill at the end of each annual reporting period. Management’s assumptions could affect the determination of estimated economic useful lives.

The Group records the present value of estimated decommissioning costs as a liability in the period in which the Group incurs a legal obligation associated with the retirement of long-lived assets that result from acquisition, construction, development and/or normal use of the assets. The Group is required to record a liability for the dismantling (demolition) of nuclear power plants and disposal of spent fuel and low and intermediate radioactive wastes. The measurement of such liability is subject to change based on change in estimated cash flow, inflation rate, discount rate, and expected timing of decommissioning.

(ii) Deferred tax

The Group recognizes deferred tax assets and liabilities based on the differences between the financial statement carrying amounts and the tax bases of assets and liabilities of each consolidated taxpaying entity. However, the amount of deferred tax assets may be different if the Group determines the estimated future taxable income is not sufficient to realize the deferred tax assets recognized.

(iii) Valuations of financial instruments at fair values

The Group’s accounting policies and disclosures require the measurement of fair values, for both financial and non-financial assets and liabilities. The Group has established control framework with respect to the measurement of fair values. The valuation team regularly reviews significant unobservable inputs and valuation adjustments.

If third party information, such as broker quotes or pricing services, is used to measure fair values, then the valuation team assesses the evidence obtained from the third parties to support the conclusion that such valuations meet the requirements of KIFRS including the level in the fair value hierarchy in which such valuation techniques should be classified.

When measuring the fair value of an asset or a liability, the Group uses market observable data as far as possible. Fair values are categorized into different levels in a fair value hierarchy based on the inputs used in the valuation techniques as follows.

If the inputs used to measure the fair value of an asset or a liability might be categorized in different levels of the fair value hierarchy, then the fair value measurement is categorized in its entirety in the same level of the fair value hierarchy as the lowest level input that is significant to the entire measurement. The Group recognizes transfers between levels of the fair value hierarchy at the end of the reporting period during which the change has occurred.

10

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

2. Basis of Preparation, Continued
(4) Use of estimates and judgments, continued
--- ---
(iv) Defined employee benefit liabilities
--- ---

The Group offers its employees defined benefit plans. The cost of providing benefits is determined using the Projected Unit Credit Method, with actuarial valuations being carried out at the end of each reporting period. For actuarial valuations, certain inputs such as discount rates and future salary increases are estimated. Defined benefit plans contain significant uncertainties in estimations due to its long-term nature (refer to Note 25).

(v) Unbilled revenue

Electricity delivered but neither metered nor billed is estimated at the reporting date based on the volume of electricity delivered which can vary significantly as a result of customer usage patterns, customer mix, meter reading schedules, weather, and etc. Unbilled revenue recognized as of March 31, 2025 and 2024 are ~~W~~2,004,454 million and ~~W~~2,054,355 million, respectively.

(vi) Construction contracts

The Group recognizes revenue over time using the cost-based input method which represents a faithful depiction of the Group’s progress towards complete satisfaction of providing the power plant construction, which has been identified as a single performance obligation. In applying the cost-based input method, it is necessary to use estimates and assumptions related to the Group’s efforts or inputs expected to be incurred. Costs incurred towards contract completion include costs associated with direct materials, labor, and other indirect costs related to contract performance. Judgment is required in estimating the costs expected to incur in completing the construction projects which involves estimating future materials, labor, contingencies and other related costs. Revenue is estimated based on the contractual amount; however, it can also be affected by uncertainties resulting from unexpected future events.

11

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

2. Basis of Preparation, Continued
(5) Changes in accounting policies
--- ---

The Group has applied the following new accounting standards and amendments for their annual reporting period commencing January 1, 2025. The amendment has no significant impact on the Group’s consolidated interim financial statements. The Group has not early adopted any other standards, interpretations or amendments that have been issued but not yet effective.

Amendments to KIFRS 1021 - Assessment of exchangeability and determination of spot exchange rate when exchangeability is lacking

The amendments to KIFRS 1021 The Effects of Changes in Foreign Exchange Rates specify how an entity should assess whether a currency is exchangeable and how it should determine a spot exchange rate when exchangeability is lacking. The amendments require disclosure of information that enables users of financial statements to understand the risk and impact of a currency not being exchangeable, or is expected to affect, an entity’s financial performance, financial position, and cash flows.

The amendments apply to annual reporting periods beginning on or after January 1, 2025. When applying this amendment, the Group does not restate comparative information.

12

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

3. Material Accounting Policies

The accounting policies applied by the Group in these consolidated financial statements are the same as those applied by the Group in its consolidated financial statements as of and for the year ended December 31, 2024, except for the changes described in Note 2.(5).

4. Segment, Geographic and Other Information
(1) Segment determination and explanation of the measurements
--- ---

The Group’s operating segments are its business components that generate discrete financial information that is reported to and regularly reviewed by chief operating decision makers of the Group including but not limited to the Chief Executive Officer, for the purpose of resource allocation and assessment of segment performance. The Group’s reportable segments classified in accordance with KIFRS 1108 are “Transmission and distribution”, “Electric power generation (Nuclear)”, “Electric power generation (Non-nuclear)”, “Plant maintenance & engineering service” and “Others”; others mainly represent the business unit that manages the Group’s foreign operations.

Segment operating profit (loss) is determined in the same way that consolidated operating profit is determined under KIFRS without any adjustment for corporate allocations. The accounting policies used by each segment are consistent with the accounting policies used in the preparation of the consolidated financial statements. Segment assets and liabilities are determined based on separate financial statements of the entities instead of on a consolidated basis. There are various transactions between the reportable segments, including sales of property, plant and equipment and so on, that are conducted on an arm’s-length basis at market prices that would be applicable to an independent third party. For subsidiaries which are in a different segment from that of its immediate parent company, their carrying amount in separate financial statements is eliminated in the consolidating adjustments in the tables below. In addition, consolidation adjustments in the table below include adjustments of the amount of investment in associates and joint ventures from the cost basis amount reflected in segment assets to that determined using equity method in the consolidated financial statements.

13

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

4. Segment, Geographic and Other Information, Continued
(2) The financial information of the segments for each of the three-month periods ended March 31, 2025 and2024, respectively, is as follows:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
For the three-month period endedMarch 31, 2025
Segment Total<br>segment<br>revenue Intersegment<br>revenue Revenue<br>from<br>external<br>customers Operating<br>profit (loss) Depreciation<br>and<br>amortization Interest<br>income Interest<br>expense Profit (loss) relatedto associates, jointventures andsubsidiaries
Transmission and distribution ~~W~~ 23,861,484 573,045 23,288,439 1,900,916 1,110,839 31,207 685,537 44,440
Electric power generation (Nuclear) 4,274,879 4,264,934 9,945 1,285,494 1,332,043 13,149 207,947 (14,182 )
Electric power generation (Non-nuclear) 7,029,030 6,371,859 657,171 576,602 1,034,045 10,352 165,349 94,646
Plant maintenance & engineering service 669,609 558,920 110,689 30,759 42,369 8,755 2,021 216
Others 563,004 405,264 157,740 22,962 62,442 63,113 78,154
Consolidation adjustments (12,174,022 ) (12,174,022 ) (63,126 ) (48,277 ) (14,588 ) (21,884 )
~~W~~ 24,223,984 24,223,984 3,753,607 3,533,461 111,988 1,117,124 125,120
In millions of won
For the three-month period endedMarch 31, 2024
Segment Total<br>segment<br>revenue Intersegment<br>revenue Revenue<br>from<br>external<br>customers Operating<br>profit (loss) Depreciation<br>and<br>amortization Interest<br>income Interest<br>expense Profit (loss) relatedto associates, jointventures andsubsidiaries
Transmission and distribution ~~W~~ 22,782,168 500,086 22,282,082 1,261,893 1,081,830 28,101 741,673 178,758
Electric power generation (Nuclear) 2,697,185 2,647,385 49,800 (277,567 ) 1,352,647 18,791 179,407 (5,618 )
Electric power generation (Non-nuclear) 7,849,482 7,133,959 715,523 306,773 1,066,695 20,201 186,822 46,164
Plant maintenance & engineering service 782,106 679,651 102,455 99,109 38,350 5,756 1,947 185,223
Others 527,088 384,205 142,883 12,238 61,180 59,009 61,269
Consolidation adjustments (11,345,286 ) (11,345,286 ) (103,103 ) (47,903 ) (13,417 ) (19,389 )
~~W~~ 23,292,743 23,292,743 1,299,343 3,552,799 118,441 1,151,729 404,527

14

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

4. Segment, Geographic and Other Information, Continued
(3) The information related to segment assets and segment liabilities as of March 31, 2025 andDecember 31, 2024 is as follows:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- --- --- ---
As of March 31, 2025
Segment Segment<br>assets Investments inassociates and<br>joint ventures Acquisition of<br>non-currentassets Segmentliabilities
Transmission and distribution ~~W~~ 141,807,325 8,600,177 1,603,407 119,779,204
Electric power generation (Nuclear) 74,735,587 157,745 854,613 48,843,613
Electric power generation (Non-nuclear) 66,289,605 4,425,323 1,053,174 37,228,313
Plant maintenance & engineering service 4,463,592 1,922 35,756 1,686,980
Others 17,032,222 39,140 7,052,247
Consolidation adjustments (54,415,234 ) 87,399 (7,788,382 )
~~W~~ 249,913,097 13,185,167 3,673,489 206,801,975
In millions of won
As of December 31, 2024
Segment Segment<br>assets Investments inassociates and<br>joint ventures Acquisition of<br>non-currentassets Segmentliabilities
Transmission and distribution ~~W~~ 139,472,103 6,839,513 8,417,992 120,083,068
Electric power generation (Nuclear) 72,508,359 171,956 2,629,626 47,082,862
Electric power generation (Non-nuclear) 66,834,569 4,272,928 3,862,287 36,363,754
Plant maintenance & engineering service 4,522,610 1,697 160,978 1,508,112
Others 14,977,126 195,451 7,073,716
Consolidation adjustments (51,506,972 ) (185,981 ) (6,666,550 )
~~W~~ 246,807,795 11,286,094 15,080,353 205,444,962

15

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

4. Segment, Geographic and Other Information, Continued
(4) Geographic information
--- ---

Electricity sales, the main operations of the Group, are conducted in the Republic of Korea. The following information on revenue from external customers and non-current assets is determined by the location of the customers and of the assets:

In millions of won Revenue from external customers Non-current assets (*2)
Geographical unit For the three-monthperiod endedMarch 31, 2025 For the three-monthperiod endedMarch 31, 2024 As of March 31, 2025 As of December 31, 2024
Domestic ~~W~~ 24,007,197 23,088,796 192,186,729 191,214,679
Overseas (*1) 216,787 203,947 6,569,834 4,757,463
~~W~~ 24,223,984 23,292,743 198,756,563 195,972,142
(*1) Middle East and other Asian countries make up the majority of overseas revenue and non-current assets. Since<br>the overseas revenue or non-current assets attributable to particular countries are not material, they are not disclosed individually.
--- ---
(*2) The amounts exclude financial assets, deferred tax assets and defined benefit assets.
--- ---
(5) Information on significant customers
--- ---

There is no single customer who accounts for 10% or more of the Group’s revenue for each of the three-month periods ended March 31, 2025 and 2024.

16

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

5. Classification of Financial Instruments
(1) The classification of financial assets as of March 31, 2025 and December 31, 2024 is as follows:
--- ---
In millions of won As of March 31, 2025
--- --- --- --- --- --- --- --- --- --- ---
Financial assetsat fair valuethrough profitor loss Financial assetsat fair valuethrough othercomprehensiveincome Financial assetsat amortized cost Derivative assets(applying hedgeaccounting) Total
Current assets
Cash and cash equivalents ~~W~~ 2,442,980 2,442,980
Current financial assets
Current financial assets at fair value through profit or loss 2,333,715 2,333,715
Current financial assets at amortized costs 50,283 50,283
Current derivative assets 396,229 519,428 915,657
Other financial assets 1,804,891 1,804,891
Trade and other receivables 11,279,269 11,279,269
2,729,944 15,577,423 519,428 18,826,795
Non-current assets
Non-current financial assets
Non-current financial assets at fair value through profit or loss 703,579 703,579
Non-current financial assets at fair value through other comprehensive income 621,935 621,935
Non-current financial assets at amortized costs 10,090 10,090
Non-current derivative assets 1,483,951 252,216 1,736,167
Other financial assets 1,643,050 1,643,050
Trade and other receivables 3,089,051 3,089,051
2,187,530 621,935 4,742,191 252,216 7,803,872
~~W~~ 4,917,474 621,935 20,319,614 771,644 26,630,667

17

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

5. Classification of Financial Instruments, Continued
(1) The classification of financial assets as of March 31, 2025 and December 31, 2024 is as follows,continued:
--- ---
In millions of won As of December 31, 2024
--- --- --- --- --- --- --- --- --- --- ---
Financial assetsat fair valuethrough profitor loss Financial assetsat fair valuethrough othercomprehensiveincome Financial assetsat amortized cost Derivative assets(applying hedgeaccounting) Total
Current assets
Cash and cash equivalents ~~W~~ 2,382,979 2,382,979
Current financial assets
Current financial assets at fair value through profit or loss 1,456,895 1,456,895
Current financial assets at amortized costs 20,418 20,418
Current derivative assets 396,477 364,077 760,554
Other financial assets 1,256,850 1,256,850
Trade and other receivables 12,216,216 12,216,216
1,853,372 15,876,463 364,077 18,093,912
Non-current assets
Non-current financial assets
Non-current financial assets at fair value through profit or loss 719,277 719,277
Non-current financial assets at fair value through other comprehensive income 674,850 674,850
Non-current financial assets at amortized costs 9,815 9,815
Non-current derivative assets 1,450,050 480,560 1,930,610
Other financial assets 1,611,438 1,611,438
Trade and other receivables 3,157,409 3,157,409
2,169,327 674,850 4,778,662 480,560 8,103,399
~~W~~ 4,022,699 674,850 20,655,125 844,637 26,197,311

18

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

5. Classification of Financial Instruments, Continued
(2) The classification of financial liabilities as of March 31, 2025 and December 31, 2024 is asfollows:
--- ---
In millions of won As of March 31, 2025
--- --- --- --- --- --- --- --- ---
Financial liabilities atfair value throughprofit or loss Financial liabilitiesrecognized at amortized cost Derivative liabilities(applying hedgeaccounting) Total
Current liabilities
Borrowings ~~W~~ 17,594,541 17,594,541
Debt securities 25,911,307 25,911,307
Derivative liabilities 15,341 15,341
Trade and other payables 8,526,811 8,526,811
15,341 52,032,659 52,048,000
Non-current liabilities
Borrowings 3,242,051 3,242,051
Debt securities 86,487,050 86,487,050
Derivative liabilities 265,488 237 265,725
Trade and other payables 4,500,784 4,500,784
265,488 94,229,885 237 94,495,610
~~W~~ 280,829 146,262,544 237 146,543,610
In millions of won As of December 31, 2024
Financial liabilities atfair value throughprofit or loss Financial liabilitiesrecognized at amortized cost Derivative liabilities(applying hedgeaccounting) Total
Current liabilities
Borrowings ~~W~~ 17,540,585 17,540,585
Debt securities 26,901,367 26,901,367
Derivative liabilities 23,914 23,914
Trade and other payables 9,411,315 9,411,315
23,914 53,853,267 53,877,181
Non-current liabilities
Borrowings 3,118,796 3,118,796
Debt securities 84,972,652 84,972,652
Derivative liabilities 256,018 4,893 260,911
Trade and other payables 4,609,241 4,609,241
256,018 92,700,689 4,893 92,961,600
~~W~~ 279,932 146,553,956 4,893 146,838,781

19

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

5. Classification of Financial Instruments, Continued
(3) The classification of comprehensive income (loss) from financial instruments for each of the three-monthperiods ended March 31, 2025 and 2024 is as follows:
--- ---
In millions of won For thethree-monthperiod endedMarch 31, 2025 For thethree-monthperiod endedMarch 31, 2024
--- --- --- --- --- --- --- ---
Cash and cash equivalents Interest income ~~W~~ 28,930 33,545
Gain (loss) on foreign currency transactions and translations (6,689 ) 6,367
Financial assets at fair value through profit or loss Interest income 7,639 17,096
Dividends income 62 78
Gain on valuation of financial assets 14,394 36,433
Gain on disposal of financial assets 9,829 8,081
Financial assets at fair value through other comprehensive income Dividends income 13,489
Gain or loss on valuation of financial assets at fair value through other comprehensive income (equity, before tax) (53,081 ) 63,649
Financial assets at amortized cost Interest income 255 266
Loss on disposal of financial assets (1 )
Gain (loss) on foreign currency transactions and translations (166 ) 1,858
Loans Interest income 9,693 9,879
Gain (loss) on foreign currency transactions and translations (56 ) 1,871
Trade and other receivables Interest income 48,146 45,920
Gain on foreign currency transactions and translations 6,214 32,146
Short-term financial instruments Interest income 10,450 4,266
Long-term financial instruments Interest income 6,826 7,385
Gain on foreign currency transactions and translations 1
Other financial assets Interest income 49 84
Financial liabilities carried at amortized cost Interest expense of borrowings and debt securities 904,184 943,406
Interest expense of trade and other payables 43,529 35,662
Interest expense of others 169,411 172,661
Other finance income 831 712
Other finance expenses 442 560
Gain (loss) on foreign currency transactions and translations 89,517 (795,332 )
Derivative assets (trading) Gain on valuation of derivatives 39,687 470,717
Gain on transaction of derivatives 47,111 34,202
Derivatives (applying hedge accounting) Gain (loss) on valuation of derivatives (profit or loss) (2,679 ) 205,663
Gain on valuation of derivatives (equity, before tax) 19,901 1,148
Gain (loss) on transaction of derivatives (2,430 ) 100

20

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

6. Restricted Deposits

Restricted deposits as of March 31, 2025 and December 31, 2024 are as follows:

In millions of won As ofMarch 31, 2025 As ofDecember 31, 2024
Cash and cash equivalents Escrow accounts ~~W~~ 3,190 3,280
Deposits for government project and others 42,108 30,812
Collateral provided for borrowings 217,488 211,522
Collateral provided for lawsuit 132 54
Deposits for transmission regional support program 6,921 8,959
Deposits for other business purposes 7,706 4,187
Short-term financial instruments Restriction on withdrawal related to ‘win-win growth<br><br><br>program’ for small and medium enterprises and others 343,520 83,520
Collateral provided for borrowings 79,069 85,569
Other current financial assets Deposits for Other Business Purposes and others 2,855
Non-current financial assets at fair value through profit or loss Decommissioning costs of nuclear power plants 291,905 296,496
Long-term financial instruments Guarantee deposits for banking accounts<br> <br>at<br>oversea branches 2 22
Collateral provided for borrowings 6,500
Decommissioning costs of nuclear power plants 670,000 660,000
Small and Medium Enterprise Development Fund 4,000
Other non-current assets Deposits for other business purposes 6,200 9,150
~~W~~ 1,675,096 1,400,071
7. Cash and Cash Equivalents
--- ---

Cash and cash equivalents as of March 31, 2025 and December 31, 2024 are as follows:

In millions of won As ofMarch 31, 2025 As ofDecember 31, 2024
Cash ~~W~~ 15,989 17,941
Other demand deposits 1,723,195 1,712,130
Short-term deposits classified as cash equivalents 605,482 548,611
Short-term investments classified as cash equivalents 98,314 104,297
~~W~~ 2,442,980 2,382,979

21

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

8. Trade and Other Receivables
(1) Trade and other receivables as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025
--- --- --- --- --- --- --- --- --- --- ---
Gross amount Allowance for<br>doubtful accounts Present value<br>discount Book value
Current assets
Trade receivables ~~W~~ 10,219,451 (179,158 ) 10,040,293
Other receivables 1,281,270 (37,528 ) (4,766 ) 1,238,976
11,500,721 (216,686 ) (4,766 ) 11,279,269
Non-current assets
Trade receivables 1,063,063 (93,858 ) 969,205
Other receivables 2,233,885 (104,173 ) (9,866 ) 2,119,846
3,296,948 (198,031 ) (9,866 ) 3,089,051
~~W~~ 14,797,669 (414,717 ) (14,632 ) 14,368,320
In millions of won As of December 31, 2024
--- --- --- --- --- --- --- --- --- --- ---
Gross amount Allowance for<br>doubtful accounts Present value<br>discount Book value
Current assets
Trade receivables ~~W~~ 11,266,202 (167,028 ) 11,099,174
Other receivables 1,160,945 (39,817 ) (4,086 ) 1,117,042
12,427,147 (206,845 ) (4,086 ) 12,216,216
Non-current assets
Trade receivables 1,089,787 (93,746 ) 996,041
Other receivables 2,272,127 (100,351 ) (10,408 ) 2,161,368
3,361,914 (194,097 ) (10,408 ) 3,157,409
~~W~~ 15,789,061 (400,942 ) (14,494 ) 15,373,625

22

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

8. Trade and Other Receivables, Continued
(2) Other receivables as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025
--- --- --- --- --- --- --- --- --- --- ---
Gross amount Allowance for<br>doubtful accounts Present valuediscount Book value
Current assets
Non-trade receivables ~~W~~ 626,037 (31,800 ) (21 ) 594,216
Accrued income 111,305 111,305
Deposits 306,836 (4 ) (4,745 ) 302,087
Finance lease receivables (*1) 94,915 (4,431 ) 90,484
Others 142,177 (1,293 ) 140,884
1,281,270 (37,528 ) (4,766 ) 1,238,976
Non-current assets
Non-trade receivables 242,079 (58,795 ) (41 ) 183,243
Accrued income 29,241 (6,320 ) 22,921
Deposits 462,679 (414 ) (9,825 ) 452,440
Finance lease receivables (*2) 1,239,329 (2,673 ) 1,236,656
Others 260,557 (35,971 ) 224,586
2,233,885 (104,173 ) (9,866 ) 2,119,846
~~W~~ 3,515,155 (141,701 ) (14,632 ) 3,358,822
(*1) The gross amount of finance lease receivables is the net lease investment by deducting unearned finance income<br>of ~~W~~119,410 million.
--- ---
(*2) The gross amount of finance lease receivables is the net lease investment by deducting unearned finance income<br>of ~~W~~912,588 million.
--- ---
In millions of won As of December 31, 2024
--- --- --- --- --- --- --- --- --- --- ---
Gross amount Allowance for<br>doubtful accounts Present valuediscount Book value
Current assets
Non-trade receivables ~~W~~ 403,248 (35,041 ) (21 ) 368,186
Accrued income 112,941 112,941
Deposits 293,712 (4 ) (4,065 ) 289,643
Finance lease receivables (*1) 92,130 (3,480 ) 88,650
Others 258,914 (1,292 ) 257,622
1,160,945 (39,817 ) (4,086 ) 1,117,042
Non-current assets
Non-trade receivables 243,813 (62,222 ) (41 ) 181,550
Accrued income 21,395 21,395
Deposits 486,868 (414 ) (10,367 ) 476,087
Finance lease receivables (*2) 1,264,269 (1,775 ) 1,262,494
Others 255,782 (35,940 ) 219,842
2,272,127 (100,351 ) (10,408 ) 2,161,368
~~W~~ 3,433,072 (140,168 ) (14,494 ) 3,278,410
(*1) The gross amount of finance lease receivables is the net lease investment by deducting unearned finance income<br>of ~~W~~121,170 million.
--- ---
(*2) The gross amount of finance lease receivables is the net lease investment by deducting unearned finance income<br>of ~~W~~956,968 million.
--- ---
(3) Trade and other receivables are classified as financial assets at amortized cost and are measured using the<br>effective interest rate method. No interest is accrued for trade receivables related to electricity for the duration between the billing date and the payment due dates. However, once trade receivables are overdue, the Group imposes a monthly<br>interest rate of 1.5% on the overdue trade receivables. The Group holds deposits of three months’ expected electricity usage for customers requesting temporary usage and customers whose contracts have been cancelled due to delinquent payments.<br>
--- ---

23

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

8. Trade and Other Receivables, Continued
(4) The aging analysis of trade receivables as of March 31, 2025 and December 31, 2024 is as follows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- --- --- ---
Trade receivables not overdue ~~W~~ 10,924,143 12,010,590
Trade receivables overdue and impairment-reviewed: 358,371 345,399
Less than 60 days 20,449 12,289
60 ~ 90 days 56,775 59,427
90 ~ 120 days 14,593 21,642
120 days ~ 1 year 59,663 56,107
More than 1 year 206,891 195,934
11,282,514 12,355,989
Less: allowance for doubtful accounts (273,016 ) (260,774 )
~~W~~ 11,009,498 12,095,215

At the end of each reporting period, the Group assesses whether the credit to trade receivables is impaired. The Group recognizes loss allowances for trade receivables individually when there is any objective evidence that other receivables are impaired and significant and classifies the trade receivables that are not individually assessed as the trade receivables subject to be assessed on a collective basis. Also, the Group recognizes loss allowances based on an expected credit loss (ECL) model.

(5) Changes in the allowance for doubtful accounts for the three-month period ended March 31, 2025 and forthe year ended December 31, 2024 are as follows:
In millions of won For the three-month period endedMarch 31, 2025 For the year endedDecember 31, 2024
--- --- --- --- --- --- --- --- --- --- --- --- ---
Tradereceivables Otherreceivables Tradereceivables Otherreceivables
Beginning balance ~~W~~ 260,774 140,168 232,645 133,953
Bad debts expense 17,635 2 48,160 21,937
Write-off (2,008 ) (689 ) (17,157 ) (23,177 )
Reversal (262 ) (7,096 ) (12,928 ) (587 )
Others (3,123 ) 9,316 10,054 8,042
Ending balance ~~W~~ 273,016 141,701 260,774 140,168

24

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

9. Financial Assets at Fair Value through Profit or Loss

Financial assets at fair value through profit or loss as of March 31, 2025 and December 31, 2024 are as follows:

In millions of won As of March 31, 2025 As of December 31, 2024
Current Non-current Current Non-current
Financial assets at fair value through profit or loss
Beneficiary certificate ~~W~~ 315 135,217 313 152,054
Cooperative 6,397 6,872
Others (*) 2,333,400 399,360 1,456,582 405,309
2,333,715 540,974 1,456,895 564,235
Financial assets designated as at fair value through profit or loss
Debt with embedded derivatives and others 162,605 155,042
~~W~~ 2,333,715 703,579 1,456,895 719,277

(*) Others include MMT, MMF etc.

25

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

10. Financial Assets at Fair Value through Other Comprehensive Income
(1) Changes in financial assets at fair value through other comprehensive income for the three-month periodended March 31, 2025 and for the year ended December 31, 2024 are as follows:
--- ---
In millions of won For the three-month period ended March 31, 2025
--- --- --- --- --- --- --- --- --- --- --- --- --- ---
Beginningbalance Acquisition Disposal Valuation Others Ending<br>balance
Equity securities
Listed ~~W~~ 360,096 (53,037 ) 307,059
Unlisted 309,709 (44 ) 166 309,831
669,805 (53,081 ) 166 616,890
Debt securities
Corporate bond 5,045 5,045
~~W~~ 674,850 (53,081 ) 166 621,935
Current financial assets at fair value through other comprehensive income ~~W~~
Non-current financial assets at fair value through other comprehensive income 674,850 (53,081 ) 166 621,935
In millions of won For the year ended December 31, 2024
--- --- --- --- --- --- --- --- --- --- --- --- --- ---
Beginningbalance Acquisition Disposal Valuation Others Ending<br>balance
Equity securities
Listed ~~W~~ 285,054 (170 ) 73,891 1,321 360,096
Unlisted 212,762 4,000 88,256 4,691 309,709
497,816 4,000 (170 ) 162,147 6,012 669,805
Debt securities
Corporate bond 4,627 418 5,045
~~W~~ 502,443 4,000 (170 ) 162,565 6,012 674,850
Current financial assets at fair value through other comprehensive income ~~W~~
Non-current financial assets at fair value through other comprehensive income 502,443 4,000 (170 ) 162,565 6,012 674,850

26

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

10. Financial Assets at Fair Value through Other Comprehensive Income, Continued
(2) Financial assets at fair value through other comprehensive income as of March 31, 2025 andDecember 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025
--- --- --- --- --- --- --- --- --- --- --- ---
Shares (in shares) Ownership Acquisition cost Book value Fair value
Listed
Korea District Heating Corp. 2,264,068 19.55 % ~~W~~ 173,201 112,185 112,185
KG Mobility Co., Ltd. 12,205 0.01 % 428 45 45
SM Korea Line Corp. 180 0.00 % 1
Namkwang Engineering & Construction Co., Ltd. 46 0.00 % 15
Bumyang Construction Co., Ltd. 35 0.00 % 2
ELCOMTEC Co., Ltd. 32,875 0.04 % 217 40 40
PAN Ocean Co., Ltd. 1,492 0.00 % 14 5 5
HD Hyundai Marine Engine Co., Ltd. 61,455 0.22 % 430 1,629 1,629
Codes Combine Co., Ltd. 291 0.00 % 1
PT Almatri Resources Indonesia 480,000,000 1.60 % 65,028 78,464 78,464
Denison Mines Corp. 58,284,000 7.46 % 84,134 112,250 112,250
Paladin Energy 100,000 0.01 % 41 51 51
KS Industry Co., Ltd 1,457 0.01 % 38 3 3
Vitzrosys Co., Ltd. 399 0.00 % 2
EMnI Co., Ltd. 628 0.00 % 25 1 1
Vissem electronics, Co., Ltd. 301 0.00 % 11 1 1
KC Industry Co., Ltd. 139 0.00 % 6
Ihsung CNI Co., Ltd. 142,860 4.43 % 1,500 1,029 1,029
Aone Alform Co., Ltd. 2,672 0.04 % 19 3 3
Kodaco Co., Ltd. 131,698 0.85 % 1,317 1,353 1,353
326,430 307,059 307,059
Unlisted (*1)
Set Holding (*2) 1,100,220 2.50 % 229,255 258,974 258,974
SGC Greenpower Co., Ltd. 580,000 5.00 % 2,900 5,569 5,569
Le Soleil KHNP LLC 137,600 19.00 % 1,376 1,376 1,376
Ihsung CNI Co., Ltd. 127,660 3.96 % 1,500 2,160 2,160
H Robotics Co., Ltd. 903,601 7.05 % 4,000 332 332
Good Tcells Co., Ltd. 11,364 0.33 % 500 571 571
IPS Bio Co., Ltd. 1,975 3.13 % 1,000 896 896
Nine B Co., Ltd. 5,000 4.96 % 1,000 1,000 1,000
Orano Expansion 5,742,405 4.72 %
Common Computer Co., Ltd. 3,856 1.64 % 1,000 1,189 1,189
Fine Powerex Co., Ltd. 72,633 4.58 % 1,500 1,610 1,610
Agencore Co., Ltd. 175,779 8.08 % 2,200 2,514 2,514
SamHong Machinery Co., Ltd. 617,535 11.06 % 7,000 8,318 8,318
Aloha Factory Co., Ltd. 2,970 3.70 % 1,000 552 552
Dailyshot Co., Ltd. 1,695 1.85 % 1,001 1,250 1,250
Mediquitous Co., Ltd. 5,080 0.58 % 1,250 1,442 1,442
Black Materials Co., Ltd. 37,038 8.31 % 500 500 500
Monit Co., Ltd. 166,667 7.14 % 1,000 1,000 1,000
Enersys Co., Ltd. 9,763 19.62 % 2,050 2,050 2,050
Kalman Co., Ltd. 23,172 9.54 % 1,000 1,000 1,000
Himet Co., Ltd. 1,754,386 13.93 % 5,000 5,000 5,000
Joongang Platec Co., Ltd. 3,591 0.75 % 72 35 35
Pioneer Gas Power Limited (*5) 123,200,010 38.50 % 49,831
Bobaek C&S Co., Ltd. 13,246 0.87 % 2,000 2,000 2,000
BDI Co., Ltd. (*3,4) 6,390,478 32.50 %
Hwan Young Steel Co., Ltd. and others 10,916 0.14 % 1,092 97 97
SAMBO AUTO. Co., Ltd. 504 0.00 % 14 38 38
Mobo Co., Ltd. and others (*6) 452,914 10,358 10,358
771,955 309,831 309,831

27

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

10. Financial Assets at Fair Value through Other Comprehensive Income, Continued
(2) Financial assets at fair value through other comprehensive income as of March 31, 2025 andDecember 31, 2024 are as follows, continued:
--- ---
In millions of won As of March 31, 2025
--- --- --- --- --- --- --- --- --- --- ---
Shares (in shares) Ownership Acquisition cost Book value Fair value
Debt securities (*1)
Aron Flying Ship Co., Ltd. ~~W~~ 491 535 535
Ino Platech Co., Ltd. 1,080 1,194 1,194
Daebon Tech Co., Ltd. 3,000 3,316 3,316
4,571 5,045 5,045
~~W~~ 1,102,956 621,935 621,935
(*1) The Group used initial cost as their fair value because there was not enough information to determine fair<br>value, and the range of the estimated fair value is wide.
--- ---
(*2) The Group has estimated the fair value of Set Holding by using the income approach and has recognized the<br>difference between its fair value and book value as gain or loss on valuation of financial assets at FVOCI in other comprehensive income or loss during the three-month period ended March 31, 2025.
--- ---
(*3) During the year ended December 31, 2024, the Group additionally acquired shares in the entity through<br>conversion of investments performed in accordance with corporate rehabilitation procedures, and classified the investments in the entity as financial assets at fair value through other comprehensive income as the Group does not hold a significant<br>influence over the entity until the corporate rehabilitation procedures are completed.
--- ---
(*4) During the year ended December 31, 2024, BDI Co., Ltd. was delisted as the Court dismissed the application<br>for temporary injunction requiring the suspension of delisting decision and others.
--- ---
(*5) The entity is undergoing corporate rehabilitation procedures for the three-month period ended March 31,<br>2025 and the Group cannot hold significant influence over the entity until the corporate rehabilitation procedures are completed. Therefore, investments in the entity were reclassified as financial assets at fair value through other comprehensive<br>income.
--- ---
(*6) Equity securities, acquired through debt-for-equity swaps of electricity rate bonds and others, consist of 477<br>companies including Mobo Co., Ltd.
--- ---

28

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

10. Financial Assets at Fair Value through Other Comprehensive Income, Continued
(2) Financial assets at fair value through other comprehensive income as of March 31, 2025 andDecember 31, 2024 are as follows, continued:
--- ---
In millions of won As of December 31, 2024
--- --- --- --- --- --- --- --- --- --- --- ---
Shares (in shares) Ownership Acquisition cost Book value Fair value
Listed
Korea District Heating Corp. 2,264,068 19.55 % ~~W~~ 173,201 93,733 93,733
KG Mobility Co., Ltd. 12,205 0.01 % 428 46 46
SM Korea Line Corp. 180 0.00 % 1
Namkwang Engineering & Construction Co., Ltd. 46 0.00 % 15
Bumyang Construction Co., Ltd. 35 0.00 % 2
ELCOMTEC Co., Ltd. 32,875 0.04 % 217 34 34
PAN Ocean Co., Ltd. 1,492 0.00 % 14 5 5
HD Hyundai Marine Engine Co., Ltd. 61,455 0.22 % 430 1,503 1,503
Codes Combine Co., Ltd. 291 0.00 % 1
PT Almatri Resources Indonesia 480,000,000 1.60 % 65,028 106,259 106,259
Denison Mines Corp. 58,284,000 7.46 % 84,134 155,766 155,766
Paladin Energy 100,000 0.01 % 41 74 74
KS Industry Co., Ltd 1,457 0.01 % 38 3 3
Vitzrosys Co., Ltd. 399 0.00 % 2
EMnI Co., Ltd. 628 0.00 % 25 1 1
Vissem electronics, Co., Ltd. 301 0.00 % 11 1 1
KC Industry Co., Ltd. 139 0.00 % 6
Aone Alform Co., Ltd. 2,672 0.04 % 19 3 3
Ihsung CNI Co., Ltd. 142,860 4.43 % 1,500 1,314 1,314
Kodaco Co., Ltd. 131,698 0.85 % 1,317 1,354 1,354
326,430 360,096 360,096
Unlisted (*1)
Set Holding (*2) 1,100,220 2.50 % 229,255 258,974 258,974
SGC Greenpower Co., Ltd. 580,000 5.00 % 2,900 5,570 5,570
Le Soleil KHNP LLC 137,600 19.00 % 1,376 1,376 1,376
Ihsung CNI Co., Ltd. 127,660 3.96 % 1,500 2,160 2,160
H Robotics Co., Ltd. 903,601 7.05 % 4,000 331 331
Good Tcells Co., Ltd. 11,364 0.33 % 500 571 571
IPS Bio Co., Ltd. 1,975 3.13 % 1,000 896 896
Nine B Co., Ltd. 5,000 4.96 % 1,000 1,000 1,000
Orano Expansion 5,742,405 4.72 %
Common Computer Co., Ltd. 3,856 1.64 % 1,000 1,189 1,189
Fine Powerex Co., Ltd. 72,633 4.58 % 1,500 1,610 1,610
Agencore Co., Ltd. 175,779 8.08 % 2,200 2,514 2,514
SamHong Machinery Co., Ltd. 617,535 11.06 % 7,000 8,318 8,318
Aloha Factory Co., Ltd. 2,970 3.70 % 1,000 552 552
Dailyshot Co., Ltd. 1,695 1.85 % 1,001 1,250 1,250
Mediquitous Co., Ltd. 5,080 0.58 % 1,250 1,442 1,442
Black Materials Co., Ltd. 37,038 8.31 % 500 500 500
Monit Co., Ltd. 166,667 7.14 % 1,000 1,000 1,000
Enersys Co., Ltd. 9,763 19.62 % 2,050 2,050 2,050
Kalman Co., Ltd. 23,172 9.54 % 1,000 1,000 1,000
Himet Co., Ltd. 1,754,386 13.93 % 5,000 5,000 5,000
Joongang Platec Co., Ltd. 3,591 0.75 % 72 35 35
Pioneer Gas Power Limited (*5) 123,200,010 38.50 % 49,831
Bobaek C&S Co., Ltd. 13,246 0.87 % 2,000 2,000 2,000
BDI Co., Ltd. (*3,4) 6,390,478 32.50 %
Hwan Young Steel Co., Ltd. and others 10,916 0.14 % 1,092 97 97
SAMBO AUTO. Co., Ltd. 15,066 0.02 % 38 38 38
Mobo Co., Ltd.(*6) 33,126 10,236 10,236
352,191 309,709 309,709

29

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

10. Financial Assets at Fair Value through Other Comprehensive Income, Continued
(2) Financial assets at fair value through other comprehensive income as of March 31, 2025 andDecember 31, 2024 are as follows, continued:
--- ---
In millions of won As of December 31, 2024
--- --- --- --- --- --- --- --- --- --- ---
Shares (in shares) Ownership Acquisition cost Book value Fair value
Debt securities (*1)
Aron Flying Ship Co., Ltd. ~~W~~ 491 535 535
Ino Platech Co., Ltd. 1,080 1,194 1,194
Daebon Tech Co., Ltd. 3,000 3,316 3,316
4,571 5,045 5,045
~~W~~ 683,192 674,850 674,850
(*1) The Group used initial cost as their fair value because there was not enough information to determine fair<br>value, and the range of the estimated fair value is wide.
--- ---
(*2) The Group has estimated the fair value of Set Holding by using the income approach and has recognized the<br>difference between its fair value and book value as gain or loss on valuation of financial assets at FVOCI in other comprehensive income or loss during the year ended December 31, 2024.
--- ---
(*3) The Group acquired shares in the entity through conversion of investments performed in accordance with<br>corporate rehabilitation procedures before the prior year, and classified the investments in the entity as financial assets at fair value through other comprehensive income as the Group does not hold a significant influence over the entity until the<br>corporate rehabilitation procedures are completed.
--- ---
(*4) During the year ended December 31, 2024, BDI Co., Ltd. was delisted as the Court dismissed the application<br>for temporary injunction requiring the suspension of delisting decision and others.
--- ---
(*5) The entity underwent corporate rehabilitation procedures during the year ended December 31, 2024, and the<br>Group cannot hold significant influence over the entity until the corporate rehabilitation procedures are completed. Therefore, investments in the entity were reclassified as financial assets at fair value through other comprehensive income.<br>
--- ---
(*6) Equity securities, acquired through debt-for-equity swaps of electricity rate bonds and others, consist of 464<br>companies including Mobo Co., Ltd.
--- ---

30

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

11. Financial Assets at Amortized Cost

Financial assets at amortized cost as of March 31, 2025 and December 31, 2024 are as follows:

In millions of won As of March 31, 2025
Financial assetsat amortized cost Book<br>value
Government bonds ~~W~~ 1,382 1,382
Others 58,991 58,991
~~W~~ 60,373 60,373
Current ~~W~~ 50,283 50,283
Non-current 10,090 10,090
In millions of won As of December 31, 2024
Financial assetsat amortized cost Book<br>value
Government bonds ~~W~~ 1,160 1,160
Others 29,073 29,073
~~W~~ 30,233 30,233
Current ~~W~~ 20,418 20,418
Non-current 9,815 9,815

31

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

12. Derivatives
(1) Derivatives as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- --- --- --- --- ---
Current Non-current Current Non-current
Derivative assets
Currency forward ~~W~~ 3,478 12,153
Currency swap 898,225 1,445,175 733,374 1,630,570
Interest rate swap 4,659 166,740 9,571 176,138
Others (*2,3) 9,295 124,252 5,456 123,902
~~W~~ 915,657 1,736,167 760,554 1,930,610
Derivative liabilities
Currency forward ~~W~~ 97 132
Currency swap 4,751 26,936 1,640 36,328
Interest rate swap 1,765 90,665 127 76,356
Others (*1,2,4) 8,728 148,124 22,015 148,227
~~W~~ 15,341 265,725 23,914 260,911
(*1) In relation to the agreement to purchase hybrid bonds issued by Samcheok Eco Materials Co., Ltd., a joint<br>venture of the Group, the performance obligation as of March 31, 2025 which amounts to ~~W~~26,422 million (~~W~~26,422 million as of December 31, 2024) to the underwriter of the bonds was recorded as other<br>derivative liabilities.
--- ---
(*2) The Group recorded the fair value of derivatives in accordance with the shareholders’ agreement of its<br>associate, Hyundai Green Power Co., Ltd., as other derivatives assets and liabilities. Also, the fair value assessment of derivatives under the power purchase agreement of the subsidiary, Elara Energy Project, LLC, has been recognized as other<br>derivative liabilities.
--- ---
(*3) The Group recorded the fair value of derivatives regarding the Power Purchase Agreement (“PPA”) of<br>its subsidiary Columboola Solar Farm Hold Co Pty., Ltd. as other derivative assets.
--- ---
(*4) The Group entered into a Price Return Swap (PRS) contract to exchange gains or losses arising from fluctuations<br>in the stock price of its subsidiary, KEPCO Engineering & Construction Company, Inc. As of March 31, 2025, the Group recognized other derivative liabilities of ~~W~~8,725 million related to the settlement contract,<br>and a loss on valuation of derivative instruments of ~~W~~8,354 million for the three-month period ended March 31, 2025.
--- ---

32

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

12. Derivatives, Continued
(2) Currency forward contracts which are not designated as hedging instruments as of March 31, 2025 are asfollows:
--- ---
In millions of won and thousands of foreign currencies except contract exchange rate information
--- --- --- --- --- --- --- --- --- ---
Counterparty Contract date Maturity<br>date Contract amounts
Pay Receive
Nonghyup Bank 2025.03.17 2025.04.08 ~~W~~ 17,374 12,000 1,447.80
Nonghyup Bank 2025.03.21 2025.04.10 10,261 7,000 1,465.85
Busan Bank 2025.03.25 2025.04.15 12,478 8,500 1,468.02
Woori Bank 2025.03.13 2025.04.01 10,154 7,000 1,450.50
Shinhan Bank 2025.03.13 2025.04.04 17,404 12,000 1,450.30
Hana Bank 2025.03.27 2025.04.17 7,347 5,000 1,469.31
Suhyup Bank 2025.02.13 2025.04.07 11,579 8,000 1,447.40
Deutsche Bank 2025.02.17 2025.04.07 5,752 4,000 1,438.00
MUFG 2025.02.18 2025.04.14 14,402 10,000 1,440.22
Mizuho Bank 2025.02.20 2025.04.14 14,360 10,000 1,436.04
Shinhan Bank 2025.02.20 2025.04.23 8,611 6,000 1,435.10
JP Morgan 2025.02.26 2025.04.23 5,711 4,000 1,427.75
SMBC 2025.02.28 2025.04.25 11,639 8,000 1,454.89
Deutsche Bank 2025.03.14 2025.04.07 17,442 12,000 1,453.48
Deutsche Bank 2025.03.14 2025.04.07 13,081 9,000 1,453.48
MUFG 2025.03.26 2025.04.02 5,860 4,000 1,465.05
JP Morgan 2025.03.12 2025.04.14 5,790 4,000 1,447.60
JP Morgan 2025.03.17 2025.04.21 3,843 2,663 1,443.40
MUFG 2025.03.24 2025.04.28 7,323 5,000 1,464.55
JP Morgan 2025.03.24 2025.04.28 7,323 5,000 1,464.55
JP Morgan 2025.03.21 2025.04.29 7,322 5,000 1,464.40
Nonghyup Bank 2025.03.21 2025.04.30 7,321 5,000 1,464.25
MUFG 2025.03.05 2025.04.14 10,173 7,000 1,453.22
Kookmin Bank 2025.03.05 2025.04.14 11,632 8,000 1,454.02
Shinhan Bank 2025.03.11 2025.04.14 6,921 4,755 1,455.32
Busan Bank 2025.03.11 2025.04.14 4,362 3,000 1,454.02
Hana Bank 2025.03.27 2025.04.07 4,406 3,000 1,468.75
SMBC 2025.03.27 2025.04.07 7,342 5,000 1,468.31
Hana Bank 2025.03.26 2025.04.24 222 141 1,582.30
Shinhan Bank 2025.03.05 2025.05.08 6 4 1,450.55
Bank of America 2025.03.05 2025.05.08 739 510 1,450.00
HSBC 2025.03.05 2025.05.08 7,243 5,000 1,448.55
Woori Bank 2025.03.05 2025.05.08 4,349 3,000 1,449.60
MUFG 2025.03.05 2025.05.08 7,231 5,000 1,446.20
Standard Chartered 2025.03.05 2025.05.08 7,232 5,000 1,446.40
Shinhan Bank 2025.03.11 2025.05.15 5,793 4,000 1,448.36
Bank of America 2025.03.11 2025.05.15 5,794 4,000 1,448.40
Hana Bank 2025.03.17 2025.05.22 8,645 6,000 1,440.77
HSBC 2025.03.17 2025.05.22 5,765 4,000 1,441.30
Shinhan Bank 2025.03.17 2025.05.29 8,752 6,000 1,458.70
Hana Bank 2025.03.17 2025.05.29 8,770 6,000 1,461.63

All values are in US Dollars.

33

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

12. Derivatives, Continued
(3) Currency swap contracts which are not designated as hedging instruments as of March 31, 2025 are asfollows:
--- ---
In millions of won and thousands of foreign currencies except contract exchange rate information
--- --- --- --- --- --- --- --- --- --- --- --- ---
Counterparty Contract year Contract amount Contract interest rate Contractexchange rate(in won)
Pay Receive Receive
Standard Chartered 2014~2029 ~~W~~ 102,470 100,000 3.14% 3.57% ~~W~~ 1,024.70
Woori Bank 2019~2027 21,708 19,417 5.04% 6.75% 1,118.00
Woori Bank 2020~2025 241,320 200,000 0.54% 1.13% 1,206.60
Korea Development Bank 2020~2025 241,320 200,000 0.54% 1.13% 1,206.60
Kookmin Bank 2020~2025 120,660 100,000 0.54% 1.13% 1,206.60
Kookmin Bank 2020~2026 76,355 70,445 5.83% 6.00% 1,083.90
Woori Bank 2021~2026 118,170 100,000 1.11% 1.13% 1,181.70
Korea Development Bank 2021~2026 118,170 100,000 1.11% 1.13% 1,181.70
Hana Bank 2021~2026 118,170 100,000 1.11% 1.13% 1,181.70
Hana Bank 2022~2025 385,800 300,000 3.11% 3.63% 1,286.00
Woori Bank 2022~2025 257,200 200,000 3.12% 3.63% 1,286.00
JP Morgan 2022~2027 128,600 100,000 3.56% 4.00% 1,286.00
Woori Bank 2022~2027 128,600 100,000 3.56% 4.00% 1,286.00
Kookmin Bank 2022~2027 128,600 100,000 3.56% 4.00% 1,286.00
Korea Development Bank 2022~2026 283,820 200,000 4.67% 5.38% 1,419.10
Hana Bank 2022~2026 141,910 100,000 4.68% 5.38% 1,419.10
JP Morgan 2022~2026 141,910 100,000 4.69% 5.38% 1,419.10
Woori Bank 2022~2026 141,910 100,000 4.68% 5.38% 1,419.10
Korea Development Bank 2022~2028 283,820 200,000 5.12% 5.50% 1,419.10
Woori Bank 2022~2028 141,910 100,000 5.13% 5.50% 1,419.10
Hana Bank 2023~2026 256,000 200,000 3.97% 5.38% 1,280.00
Shinhan Bank 2023~2026 192,000 150,000 3.99% 5.38% 1,280.00
Kookmin Bank 2023~2026 128,000 100,000 4.03% 5.38% 1,280.00
Korea Development Bank 2023~2026 256,000 200,000 4.04% 5.38% 1,280.00
Bank of America 2023~2026 128,000 100,000 4.04% 5.38% 1,280.00
Standard Chartered 2023~2026 128,000 100,000 4.04% 5.38% 1,280.00
Woori Bank 2023~2026 192,000 150,000 4.05% 5.38% 1,280.00
Shinhan Bank 2024~2027 133,060 100,000 3.53% 4.88% 1,330.60
Kookmin Bank 2024~2027 133,060 100,000 3.53% 4.88% 1,330.60
Korea Development Bank 2024~2027 864,890 650,000 3.53% 4.88% 1,330.60
Bank of America 2024~2027 133,060 100,000 3.53% 4.88% 1,330.60
Standard Chartered 2024~2027 133,060 100,000 3.53% 4.88% 1,330.60
IBK Securities Co., Ltd. 2024~2027 199,590 150,000 3.53% 4.88% 1,330.60
Shinhan Bank 2024~2034 138,010 100,000 3.64% 5.13% 1,380.10
Hana Bank 2024~2034 138,010 100,000 3.69% 5.13% 1,380.10
Woori Bank 2024~2034 119,958 86,920 3.74% 5.13% 1,380.10
Nomura 2015~2025 111,190 100,000 2.60% 3.25% 1,111.90
Korea Development Bank 2015~2025 111,190 100,000 2.62% 3.25% 1,111.90
Woori Bank 2015~2025 55,595 50,000 2.62% 3.25% 1,111.90
Hana Bank 2015~2025 55,595 50,000 2.62% 3.25% 1,111.90
Woori Bank 2017~2027 111,610 100,000 2.25% 3.13% 1,116.10
Korea Development Bank 2017~2027 111,610 100,000 2.31% 3.13% 1,116.10
Hana Bank 2017~2027 111,610 100,000 2.31% 3.13% 1,116.10
Korea Development Bank 2018~2028 108,600 HKD 800,000 2.69% 3.35% 135.75
Shinhan Bank 2018~2028 115,387 HKD 850,000 2.66% 3.35% 135.75
Korea Development Bank 2019~2027 119,978 CHF 100,000 1.43% 0.05% 1,199.78
Woori Bank 2021~2026 222,800 200,000 0.93% 1.25% 1,114.00
Shinhan Bank 2021~2026 111,400 100,000 0.92% 1.25% 1,114.00
Korea Development Bank 2021~2026 111,400 100,000 0.93% 1.25% 1,114.00
Nonghyup Bank 2021~2026 111,400 100,000 0.93% 1.25% 1,114.00
Woori Bank 2022~2027 262,000 200,000 3.62% 4.25% 1,310.00
Export-Import Bank of Korea 2022~2027 131,000 100,000 3.63% 4.25% 1,310.00
Kookmin Bank 2022~2027 131,000 100,000 3.62% 4.25% 1,310.00

All values are in US Dollars.

34

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

12. Derivatives, Continued
(3) Currency swap contracts which are not designated as hedging instruments as of March 31, 2025 are asfollows, continued:
--- ---
In millions of won and thousands of foreign currencies except contract exchange rate information
--- --- --- --- --- --- --- --- --- --- --- --- ---
Counterparty Contract year Contract amount Contract interest rate Contractexchange rate(in won)
Pay Receive Receive
Hana Bank 2022~2027 ~~W~~ 131,000 100,000 3.61% 4.25% ~~W~~ 1,310.00
Korea Development Bank 2022~2027 262,000 200,000 3.63% 4.25% 1,310.00
Export-Import Bank of Korea 2022~2032 349,829 HKD 1,935,000 4.87% 5.16% 180.79
JP Morgan 2022~2032 75,194 HKD 415,000 5.00% 5.16% 181.19
Export-Import Bank of Korea 2023~2030 172,982 HKD 1,037,000 4.25% 4.51% 166.81
Hana Bank 2024~2028 128,940 100,000 3.73% 5.00% 1,289.40
JP Morgan 2024~2028 128,940 100,000 3.85% 5.00% 1,289.40
Korea Development Bank 2024~2028 257,880 200,000 3.80% 5.00% 1,289.40
Korea Development Bank 2024~2028 128,940 100,000 3.69% 5.00% 1,289.40
Hana Bank 2024~2029 138,540 100,000 3.15% 4.63% 1,385.40
Shinhan Bank 2024~2029 138,540 100,000 3.15% 4.63% 1,385.40
Kookmin Bank 2024~2029 138,540 100,000 3.16% 4.63% 1,385.40
Woori Bank 2024~2029 138,540 100,000 3.17% 4.63% 1,385.40
Korea Development Bank 2024~2029 138,540 100,000 3.19% 4.63% 1,385.40
Credit Agricole 2025~2028 218,963 HKD 1,166,000 2.85% 4.10% 187.79

All values are in US Dollars.

35

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

12. Derivatives, Continued
(4) Currency swap contracts which are designated as hedging instruments as of March 31, 2025 are asfollows:
--- ---
In millions of won and thousands of foreign currencies except contract exchange rate information
--- --- --- --- --- --- --- --- --- --- --- --- ---
Counterparty Contract year Contract amount Contract interest rate Contractexchange rate(in won)
Pay Receive Receive
Korea Development Bank 2020~2026 ~~W~~ 118,910 100,000 0.61% 1.00% ~~W~~ 1,189.10
Hana Bank 2020~2026 118,910 100,000 0.61% 1.00% 1,189.10
Woori Bank 2020~2026 118,910 100,000 0.62% 1.00% 1,189.10
Nomura 2017~2037 52,457 40,000 2.60% 1.70% 1,311.42
Nomura 2017~2037 59,423 SEK 450,000 2.62% 2.36% 132.05
Kookmin Bank 2021~2026 114,230 100,000 1.27% 1.25% 1,142.30
Korea Development Bank 2021~2026 114,230 100,000 1.27% 1.25% 1,142.30
Hana Bank 2021~2026 114,230 100,000 1.27% 1.25% 1,142.30
Korea Development Bank 2022~2027 123,710 100,000 3.41% 3.63% 1,237.10
Woori Bank 2022~2027 123,710 100,000 3.41% 3.63% 1,237.10
JP Morgan 2022~2027 123,710 100,000 3.41% 3.63% 1,237.10
Korea Development Bank 2022~2025 128,560 100,000 3.37% 4.13% 1,285.60
Woori Bank 2022~2025 128,560 100,000 3.37% 4.13% 1,285.60
Kookmin Bank 2022~2025 128,560 100,000 3.37% 4.13% 1,285.60
Woori Bank 2021~2026 220,600 200,000 0.47% 0.75% 1,103.00
Shinhan Bank 2021~2026 220,600 200,000 0.47% 0.75% 1,103.00
Hana Bank 2021~2026 55,150 50,000 0.48% 0.75% 1,103.00
Shinhan Bank 2023~2026 132,930 100,000 4.07% 5.38% 1,329.30
Nonghyup Bank 2023~2026 132,930 100,000 4.05% 5.38% 1,329.30
Kookmin Bank 2023~2026 132,930 100,000 4.07% 5.38% 1,329.30
Woori Bank 2020~2025 245,560 200,000 0.93% 1.75% 1,227.80
Hana Bank 2020~2025 245,560 200,000 0.93% 1.75% 1,227.80
Korea Development Bank 2020~2025 122,780 100,000 0.93% 1.75% 1,227.80
JP Morgan 2022~2025 126,180 100,000 2.80% 3.60% 1,261.80
Hana Bank 2022~2025 126,180 100,000 2.80% 3.60% 1,261.80
Korea Development Bank 2022~2025 252,360 200,000 2.83% 3.60% 1,261.80
Woori Bank 2022~2025 126,180 100,000 2.85% 3.60% 1,261.80
Woori Bank 2023~2028 259,000 200,000 3.83% 4.88% 1,295.00
Korea Development Bank 2023~2028 129,500 100,000 3.85% 4.88% 1,295.00
Bank of America 2023~2028 64,750 50,000 3.85% 4.88% 1,295.00

All values are in US Dollars.

36

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

12. Derivatives, Continued
(5) Interest rate swap contracts which are not designated as hedging instruments as of March 31, 2025 areas follows:
--- ---
In millions of won and thousands of foreign currencies Contract interest rate per annum
--- --- --- --- --- --- ---
Counterparty Contract year Contract<br>amount Pay Receive
Nomura (*1) 2018~2038 ~~W~~ 30,000 3M CD + 0.10% 3.75%
Shinhan Bank 2021~2025 100,000 2.32% 3M CD + 0.43%
Hana Bank 2022~2027 200,000 3.02% 3M CD + 0.61%
Hana Bank 2022~2027 200,000 3.04% 3M CD + 0.58%
Hana Bank 2022~2027 250,000 3.38% 3M CD + 0.59%
Nomura 2022~2027 200,000 3.55% 3M CD + 0.60%
Shinhan Bank 2022~2027 150,000 3.53% 3M CD + 0.55%
Hana Bank 2022~2027 200,000 3.70% 3M CD + 0.59%
Nomura 2022~2027 300,000 3.89% 3M CD + 0.67%
Hana Bank 2022~2027 200,000 3.93% 3M CD + 0.67%
Nomura 2022~2027 200,000 3.80% 3M CD + 0.68%
Nomura 2022~2027 300,000 4.04% 3M CD + 0.60%
Hana Bank 2022~2027 100,000 4.68% 3M CD + 1.04%
Hana Bank 2022~2027 100,000 5.45% 3M CD + 1.20%
Shinhan Bank 2023~2028 200,000 4.27% 3M CD + 0.76%
Shinhan Bank 2023~2028 50,000 4.27% 3M CD + 0.76%
Nomura 2023~2028 250,000 4.13% 3M CD + 0.73%
Hana Bank 2023~2028 200,000 3.74% 3M CD + 0.51%
Hana Bank 2023~2028 100,000 4.19% 3M CD + 0.50%
Shinhan Bank 2023~2028 300,000 3.81% 3M CD + 0.70%
Hana Bank 2023~2028 200,000 3.95% 3M CD + 0.50%
Shinhan Bank 2024~2029 200,000 3.84% 3M CD + 0.50%
Hana Bank 2024~2027 250,000 3.72% 3M CD + 0.34%
Hana Bank 2024~2027 250,000 3.77% 3M CD + 0.31%
Hana Bank 2024~2027 250,000 3.31% 3M CD + 0.31%
Hana Bank 2024~2027 200,000 3.46% 3M CD + 0.53%
Shinhan Bank 2024~2025 200,000 3.53% 3M CD + 0.35%
Nomura 2024~2027 200,000 3.38% 3M CD + 0.50%
Hana Bank 2024~2027 300,000 3.18% 3M CD + 0.53%
Shinhan Bank 2024~2025 100,000 3.29% 3M CD + 0.42%
Hana Bank 2025~2030 200,000 3.28% 3M CD + 0.57%
Hana Bank 2025~2030 200,000 3.28% 3M CD + 0.62%
Nomura 2017~2032 52,457 2.55% + Floating rate 2.60%
Nomura 2017~2032 59,423 2.57% + Floating rate 2.62%
Nomura (*2) 2021~2041 30,000 1.84% 2.60%
Nomura (*3) 2021~2041 50,000 1.87% 2.38%
ANZ 2022~2025 AUD 865 0.48% 3M BBSW + 0.05%
DBS Bank 2022~2025 AUD 865 0.48% 3M BBSW + 0.05%
Societe Generale 2022~2025 AUD 865 0.48% 3M BBSW + 0.05%
MUFG 2022~2048 USD 155,941 3M SOFR 3.71%
Mizuho Capital Markets LLC 2022~2048 USD 155,941 3M SOFR 1.05%
Mizuho Capital Markets LLC 2024~2025 USD 112,194 1M SOFR 4.20%
Rabobank 2022~2036 USD 37,130 1.83% 6M SOFR
Mizuho Capital Markets LLC 2024~2045 USD 80,116 3M USD Synthetic Libor 1.14%
(*1) Depending on the counterparty exercising the right, the contract may be early settled on the same date every<br>year from June 15, 2023.
--- ---
(*2) 1.84% of the contract paying interest rate is applied for five years from the date of issuance, and 3M<br>CMT+0.35% is applied thereafter.
--- ---
(*3) 1.87% of the contract paying interest rate is applied for five years from the date of issuance, and 3M<br>CMT+0.35% is applied thereafter.
--- ---

37

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

12. Derivatives, Continued
(6) Interest rate swap contracts which are designated as hedging instruments as of March 31, 2025 are asfollows:
--- ---
In thousands of foreign currencies Contract interest rate per annum
--- --- --- --- --- --- --- ---
Counterparty Contract year Contract<br>amount Pay Receive
Export-Import Bank of Korea 2015~2031 USD 15,893 2.67% 6M  Synthetic Libor
ING Bank 2015~2031 USD 7,861 2.67% 6M Synthetic Libor
BNP Paribas 2015~2031 USD 7,861 2.67% 6M Synthetic Libor
BNP Paribas 2009~2027 USD 29,143 4.16% 6M Synthetic Libor
KFW 2009~2027 USD 29,143 4.16% 6M Synthetic Libor
Export-Import Bank of Korea 2016~2036 USD 56,175 3.00% 6M Synthetic Libor
SMTB 2025~2036 JPY 3,900,000 6M TIBOR + 0.55% 1.82

All values are in US Dollars.

(7) Gains and losses on valuation and transaction of derivatives for the three-month periods endedMarch 31, 2025 and 2024 are as follows and they are included as finance income and expenses in the consolidated statements of comprehensive income (loss):
In millions of won Net income effects of valuation gain (loss) Net income effects of transaction gain (loss) Accumulated other<br>comprehensive<br>income (loss) (*)
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
For the three-month periodended March 31,2025 For the three-month periodended March 31,2024 For the three-month periodended March 31,2025 For the three-month periodended March 31,2024 For the three-month periodended March 31,2025 For the three-month periodended March 31,2024
Currency forward ~~W~~ 3,334 15,149 (9,669 ) 19,751
Currency swap 47,822 618,110 45,653 4,168 22,574 (2,478 )
Interest rate swap (22,503 ) 29,682 (792 ) 6,927 (2,673 ) 3,626
Other derivatives 8,355 13,439 9,489 3,456
~~W~~ 37,008 676,380 44,681 34,302 19,901 1,148
(*) For the three-month periods ended March 31, 2025 and 2024, the net gain(loss) on valuation of derivatives<br>applying cash flow hedge accounting of ~~W~~10,463 million and ~~W~~1,501 million, net of tax, are included in other comprehensive income, respectively.
--- ---

38

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

13. Other Financial Assets
(1) Other financial assets as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- --- --- --- --- --- --- --- --- ---
Current Non-current Current Non-current
Loans ~~W~~ 104,535 927,177 115,161 901,953
Less: allowance for doubtful accounts (5,413 ) (67,175 ) (5,156 ) (66,838 )
Less: present value discount (1,102 ) (36,584 ) (1,084 ) (35,888 )
98,020 823,418 108,921 799,227
Long-term / short-term financial instruments 1,706,871 819,632 1,147,929 812,211
~~W~~ 1,804,891 1,643,050 1,256,850 1,611,438
(2) Loans as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025
--- --- --- --- --- --- --- --- --- --- ---
Face value Allowance fordoubtful accounts Present valuediscount Carrying value
Short-term loans
Loans for tuition ~~W~~ 34,682 (5,156 ) (1,102 ) 28,424
Loans for housing 39,976 39,976
Other loans 29,877 (257 ) 29,620
104,535 (5,413 ) (1,102 ) 98,020
Long-term loans
Loans for tuition 371,797 (3,766 ) (36,584 ) 331,447
Loans for housing 262,017 262,017
Loans for related parties 282,468 (63,409 ) 219,059
Other loans 10,895 10,895
927,177 (67,175 ) (36,584 ) 823,418
~~W~~ 1,031,712 (72,588 ) (37,686 ) 921,438
In millions of won As of December 31, 2024
--- --- --- --- --- --- --- --- --- --- ---
Face value Allowance fordoubtful accounts Present valuediscount Carrying value
Short-term loans
Loans for tuition ~~W~~ 34,484 (5,156 ) (1,084 ) 28,244
Loans for housing 43,171 43,171
Other loans 37,506 37,506
115,161 (5,156 ) (1,084 ) 108,921
Long-term loans
Loans for tuition 364,685 (4,888 ) (35,888 ) 323,909
Loans for housing 266,208 266,208
Loans for related parties 260,227 (61,950 ) 198,277
Other loans 10,833 10,833
901,953 (66,838 ) (35,888 ) 799,227
~~W~~ 1,017,114 (71,994 ) (36,972 ) 908,148

39

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

13. Other Financial Assets, Continued
(3) Changes in the allowance for doubtful accounts of loans for the three-month period ended March 31, 2025and for the year ended December 31, 2024 are as follows:
--- ---
In millions of won For the three-monthperiod endedMarch 31, 2025 For the year endedDecember 31, 2024
--- --- --- --- --- --- ---
Beginning balance ~~W~~ 71,994 80,793
Bad debts expense (reversal) 596 3,727
Write-off (2 ) (12,526 )
Ending balance ~~W~~ 72,588 71,994
(4) Long-term and short-term financial instruments as of March 31, 2025 and December 31, 2024 are asfollows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- --- --- --- --- ---
Current Non-current Current Non-current
Time deposits ~~W~~ 1,410,604 141,649 823,806 135,995
CD 10,000 40,000
Others 286,267 677,983 284,123 676,216
~~W~~ 1,706,871 819,632 1,147,929 812,211

40

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

14. Inventories

Inventories as of March 31, 2025 and December 31, 2024 are as follows:

In millions of won As of March 31, 2025
Acquisition cost Valuation allowance Book value
Raw materials ~~W~~ 4,991,370 (1,569 ) 4,989,801
Merchandises 963 963
Work-in-progress 217,204 217,204
Finished goods 63,887 (1,900 ) 61,987
Supplies 3,455,040 3,455,040
Inventories-in-transit 1,049,225 1,049,225
Other inventories 17,477 17,477
~~W~~ 9,795,166 (3,469 ) 9,791,697
In millions of won As of December 31, 2024
Acquisition cost Valuation allowance Book value
Raw materials ~~W~~ 4,914,250 (1,573 ) 4,912,677
Merchandises 1,733 1,733
Work-in-progress 220,110 220,110
Finished goods 96,390 (630 ) 95,760
Supplies 3,358,831 3,358,831
Inventories-in-transit 1,160,238 1,160,238
Other inventories 19,887 19,887
~~W~~ 9,771,439 (2,203 ) 9,769,236

The loss from inventory valuation (reversal of the allowance for loss on inventory valuation) included in cost of sales for the three-month period ended March 31, 2025 and for the year ended December 31, 2024 amounts to ~~W~~572 million and ~~W~~(9,182) million, respectively.

The amounts of loss from inventory valuation included in other gains or losses for the three-month period ended March 31, 2025 and for the year ended December 31, 2024 were ~~W~~694 million and ~~W~~9,941 million, respectively.

41

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

15. Non-Financial Assets

Non-financial assets as of March 31, 2025 and December 31, 2024 are as follows:

In millions of won As of March 31, 2025 As of December 31, 2024
Current Non-current Current Non-current
Advanced payments ~~W~~ 512,050 67,125 467,156 66,174
Prepaid expenses 421,843 260,165 431,087 221,922
Others (*) 353,021 25,994 369,671 40,108
~~W~~ 1,286,914 353,284 1,267,914 328,204
(*) Details of others as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- --- --- --- --- ---
Current Non-current Current Non-current
Greenhouse gas emissions rights ~~W~~ 155,307 211,969
Other quick assets 197,714 25,994 157,702 40,108
~~W~~ 353,021 25,994 369,671 40,108

42

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

16. Consolidated Subsidiaries
(1) Consolidated subsidiaries as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
Subsidiaries Key operation activities Location Percentage of ownership (%)
--- --- --- --- --- --- --- --- ---
As of March 31,<br>2025 As of December 31,2024
Korea Hydro & Nuclear Power Co., Ltd. Power generation Korea 100.00 % 100.00 %
Korea South-East Power Co., Ltd. Power generation Korea 100.00 % 100.00 %
Korea Midland Power Co., Ltd. Power generation Korea 100.00 % 100.00 %
Korea Western Power Co., Ltd. Power generation Korea 100.00 % 100.00 %
Korea Southern Power Co., Ltd. Power generation Korea 100.00 % 100.00 %
Korea East-West Power Co., Ltd. Power generation Korea 100.00 % 100.00 %
KEPCO Engineering & Construction Company, Inc. (*1) Engineering and construction for utility plant and others Korea 51.00 % 51.00 %
KEPCO Plant Service & Engineering Co., Ltd. Utility plant maintenance and others Korea 51.00 % 51.00 %
KEPCO Nuclear Fuel Co., Ltd. Nuclear fuel Korea 96.36 % 96.36 %
KEPCO KDN Co., Ltd. Electric power information technology and others Korea 100.00 % 100.00 %
KEPCO International HongKong Ltd. Holding company Hong Kong 100.00 % 100.00 %
KEPCO International Philippines Inc. Holding company Philippines 100.00 % 100.00 %
KEPCO Gansu International Ltd. Holding company Hong Kong 100.00 % 100.00 %
KEPCO Philippines Holdings Inc. Holding company Philippines 100.00 % 100.00 %
KEPCO Philippines Corporation Operation of utility plant Philippines 100.00 % 100.00 %
KEPCO Ilijan Corporation Construction and operation of utility plant Philippines 51.00 % 51.00 %
KEPCO Neimenggu International Ltd. Holding company Hong Kong 100.00 % 100.00 %
KEPCO Shanxi International Ltd. Holding company Hong Kong 100.00 % 100.00 %
KOMIPO Global Pte Ltd. Holding company Singapore 100.00 % 100.00 %
KEPCO Netherlands B.V. Holding company Netherland 100.00 % 100.00 %
KEPCO Australia Pty., Ltd. Resources development Australia 100.00 % 100.00 %
KOSEP Australia Pty., Ltd. Resources development Australia 100.00 % 100.00 %
KOMIPO Australia Pty., Ltd. Resources development Australia 100.00 % 100.00 %
KOWEPO Australia Pty., Ltd. Resources development Australia 100.00 % 100.00 %
KOSPO Australia Pty., Ltd. Resources development Australia 100.00 % 100.00 %
KEPCO Middle East Holding Company Holding company Bahrain 100.00 % 100.00 %
Qatrana Electric Power Company Construction and operation of utility plant Jordan 80.00 % 80.00 %
KHNP Canada Energy Ltd. Holding company Canada 100.00 % 100.00 %
KEPCO Bylong Australia Pty., Ltd. Resources development Australia 100.00 % 100.00 %
Korea Waterbury Uranium Limited Partnership Resources development Canada 80.12 % 80.12 %
KEPCO Holdings de Mexico Holding company Mexico 100.00 % 100.00 %
KST Electric Power Company, S.A.P.I. de C.V. Construction and operation of utility plant Mexico 56.00 % 56.00 %
KEPCO Energy Service Company Operation of utility plant Mexico 100.00 % 100.00 %
KEPCO Netherlands S3 B.V. Holding company Netherlands 100.00 % 100.00 %
PT. KOMIPO Pembangkitan Jawa Bali Operation of utility plant Indonesia 51.00 % 51.00 %
PT. Cirebon Power Service (*2) Operation of utility plant Indonesia 27.50 % 27.50 %
KOWEPO International Corporation Operation of utility plant Philippines 99.99 % 99.99 %
KOSPO Jordan LLC Operation of utility plant Jordan 100.00 % 100.00 %
EWP America Inc. Holding company USA 100.00 % 100.00 %
EWP Renewable Corporation Holding company USA 100.00 % 100.00 %
KNF Canada Energy Limited Holding company Canada 100.00 % 100.00 %
EWP Barbados 1 SRL Holding company Barbados 100.00 % 100.00 %
California Power Holdings, LLC Power generation USA 100.00 % 100.00 %
Gyeonggi Green Energy Co., Ltd. Power generation Korea 62.01 % 62.01 %
PT. Tanggamus Electric Power Power generation Indonesia 52.50 % 52.50 %
Gyeongju Wind Power Co., Ltd. Power generation Korea 70.00 % 70.00 %
KOMIPO America Inc. Holding company USA 100.00 % 100.00 %
PT. EWP Indonesia Holding company Indonesia 99.99 % 99.99 %
KEPCO Netherlands J3 B.V. Holding company Netherlands 100.00 % 100.00 %
Korea Offshore Wind Power Co., Ltd. Power generation Korea 100.00 % 100.00 %
Global One Pioneer B.V. Holding company Netherlands 100.00 % 100.00 %
Global Energy Pioneer B.V. Holding company Netherlands 100.00 % 100.00 %
Mira Power Limited (*3) Power generation Pakistan 76.00 % 76.00 %
KOSEP Material Co., Ltd. Recycling fly ashes Korea 86.22 % 86.22 %
Commerce and Industry Energy Co., Ltd. (*4) RDF power generation Korea 85.03 % 85.03 %

43

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

16. Consolidated Subsidiaries, Continued
(1) Consolidated subsidiaries as of March 31, 2025 and December 31, 2024 are as follows, continued:
--- ---
Percentage of ownership (%)
--- --- --- --- --- --- --- --- ---
Subsidiaries Key operation activities Location As of March 31,<br>2025 As of December 31,2024
KEPCO KPS Philippines Corp. Utility plant maintenance and others Philippines 99.99 % 99.99 %
KOSPO Chile SpA Holding company Chile 100.00 % 100.00 %
Hee Mang Sunlight Power Co., Ltd. Operation of utility plant Korea 100.00 % 100.00 %
Fujeij Wind Power Company Operation of utility plant Jordan 100.00 % 100.00 %
KOSPO Youngnam Power Co., Ltd. Operation of utility plant Korea 100.00 % 100.00 %
Chitose Solar Power Plant LLC Power generation Japan 65.00 % 65.00 %
KEPCO ES Co., Ltd. Energy service Korea 100.00 % 100.00 %
KEPCO Solar Co., Ltd. Power generation Korea 100.00 % 100.00 %
KOSPO Power Services Ltda. Utility plant maintenance and others Chile 65.00 % 65.00 %
Energy New Industry Specialized Investment Private Investment Trust Holding company Korea 99.01 % 99.01 %
KOEN Bylong Pty., Ltd. Resources development Australia 100.00 % 100.00 %
KOMIPO Bylong Pty., Ltd. Resources development Australia 100.00 % 100.00 %
KOWEPO Bylong Pty., Ltd. Resources development Australia 100.00 % 100.00 %
KOSPO Bylong Pty., Ltd. Resources development Australia 100.00 % 100.00 %
EWP Bylong Pty., Ltd. Resources development Australia 100.00 % 100.00 %
KOWEPO Lao International Utility plant maintenance and others Laos 100.00 % 100.00 %
KEPCO Mangilao Holdings LLC Holding company USA 100.00 % 100.00 %
Mangilao Investment LLC Holding company USA 69.55 % 69.55 %
KEPCO Mangilao Solar, LLC Power generation USA 100.00 % 100.00 %
Jeju Hanlim Offshore Wind Co., Ltd. Power generation Korea 79.03 % 79.03 %
PT. Siborpa Eco Power Construction and operation of utility plant Indonesia 55.00 % 55.00 %
BSK E-New Industry Fund VII Holding company Korea 81.67 % 81.67 %
e-New Industry LB Fund 1 Holding company Korea 76.11 % 76.11 %
Songhyun e-New Industry Fund Holding company Korea 80.65 % 80.65 %
BSK E-New Industry Fund X Holding company Korea 66.80 % 66.80 %
PT. Korea Energy Indonesia Utility plant maintenance and others Indonesia 95.00 % 95.00 %
KOLAT SpA Utility plant maintenance and others Chile 100.00 % 100.00 %
KEPCO California, LLC Holding company USA 100.00 % 100.00 %
KEPCO Mojave Holdings, LLC Holding company USA 100.00 % 100.00 %
Incheon Fuel Cell Co., Ltd. Power generation Korea 60.00 % 60.00 %
KOEN Service Co., Ltd. Facility maintenance and service Korea 100.00 % 100.00 %
KOMIPO Service Co., Ltd. Facility maintenance and service Korea 100.00 % 100.00 %
KOWEPO Service Co., Ltd. Facility maintenance and service Korea 100.00 % 100.00 %
KOSPO Service Co., Ltd. Facility maintenance and service Korea 100.00 % 100.00 %
EWP Service Co., Ltd. Facility maintenance and service Korea 100.00 % 100.00 %
PT. KOMIPO Energy Indonesia Utility plant maintenance and others Indonesia 95.00 % 95.00 %
KNF Partners Co., Ltd. Facility maintenance and service Korea 100.00 % 100.00 %
KOSPO USA Inc. Holding company USA 100.00 % 100.00 %
KOSPO Niles LLC (formerly, Nambu USA LLC) Holding company USA 100.00 % 100.00 %
Tamra Offshore Wind Power Co., Ltd. Power generation Korea 63.00 % 63.00 %
KEPCO MCS Co., Ltd. Electric meter reading and others Korea 100.00 % 100.00 %
KEPCO FMS Co., Ltd. Security service and others Korea 100.00 % 100.00 %
Firstkeepers Co., Ltd. Facility maintenance and service Korea 100.00 % 100.00 %
Secutec Co., Ltd. Security service Korea 100.00 % 100.00 %
SE Green Energy Co., Ltd. Power generation Korea 100.00 % 84.80 %
Mangilao Intermediate Holdings LLC Holding company USA 100.00 % 100.00 %
KEPCO CSC Co., Ltd. Facility maintenance and service Korea 100.00 % 100.00 %
KOAK Power Limited Hydro power facility maintenance Pakistan 100.00 % 100.00 %
KOMIPO Europe B.V. Holding company Netherlands 100.00 % 100.00 %
Haenanum Energy Fund Holding company Korea 99.64 % 99.64 %
Paju Ecoenergy Co., Ltd. Power generation Korea 93.68 % 89.00 %
Guam Ukudu Power LLC Power generation USA 100.00 % 100.00 %
K-SOLAR SHINAN Co., Ltd. Power generation Korea 90.00 % 90.00 %
KPS Partners Co., Ltd. Facility maintenance and service Korea 100.00 % 100.00 %
KEPCO E&C Service Co., Ltd. Facility maintenance and service Korea 100.00 % 100.00 %

44

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

16. Consolidated Subsidiaries, Continued
(1) Consolidated subsidiaries as of March 31, 2025 and December 31, 2024 are as follows, continued:
--- ---
Percentage of ownership (%)
--- --- --- --- --- --- --- --- ---
Subsidiaries Key operation activities Location As of March 31,<br>2025 As of December 31,2024
Moha solar Co., Ltd. Power generation Korea 100.00 % 100.00 %
Ogiri Solar Power Co., Ltd. Power generation Korea 70.00 % 70.00 %
KHNP USA LLC Holding company USA 100.00 % 100.00 %
KOMIPO Vanphong Power Service LLC Utility plant maintenance and others Vietnam 100.00 % 100.00 %
Energy Innovation Fund I Holding company Korea 71.91 % 71.91 %
KHNP Chile SpA Holding company Chile 100.00 % 100.00 %
Yeong Yang Apollon Photovoltaic Co., Ltd. Power generation Korea 100.00 % 100.00 %
Yeong Yang Corporation Co., Ltd. Power generation Korea 100.00 % 100.00 %
SolarVader Co., Ltd. Power generation Korea 100.00 % 100.00 %
Yeong Yang Innovation Co., Ltd. Power generation Korea 100.00 % 100.00 %
Yeong Yang Horus Photovoltaic Co., Ltd. Power generation Korea 100.00 % 100.00 %
Yeong Yang Solar Management Co., Ltd. Power generation Korea 100.00 % 100.00 %
LSG Hydro Power Limited Holding company Pakistan 99.99 % 99.99 %
KOEN Bio Co., Ltd. Wood pellet utilization business Korea 70.00 % 70.00 %
KOMIPO Energy Solution America, LLC Holding company USA 100.00 % 100.00 %
Elara Investment Holdings, LLC (*5) Holding company USA 0.10 % 0.10 %
Elara Equity Holdings, LLC Holding company USA 54.00 % 54.00 %
Elara Class B Holdings, LLC Holding company USA 100.00 % 100.00 %
Elara Class B Member, LLC Holding company USA 100.00 % 100.00 %
Elara Development Holdings, LLC Holding company USA 100.00 % 100.00 %
KOMIPO Development, LLC Holding company USA 100.00 % 100.00 %
Elara Energy Holdings, LLC Holding company USA 61.62 % 61.62 %
Elara Energy Project, LLC Power generation USA 100.00 % 100.00 %
KOMIPO Iberian Solar Group, S.L.U. Holding company Spain 100.00 % 100.00 %
Jeongam Wind Power Co., Ltd. Power generation Korea 80.00 % 80.00 %
KOWEPO Europe B.V. Holding company Netherlands 100.00 % 100.00 %
CVS Equity Holdings, LLC Holding company USA 80.96 % 80.96 %
CVS Class B Holdings, LLC Holding company USA 100.00 % 100.00 %
CVS Development Holdings, LLC Holding company USA 100.00 % 100.00 %
CVS Development, LLC Holding company USA 100.00 % 100.00 %
CVS Class B Member, LLC Holding company USA 100.00 % 100.00 %
CVS Energy Holdings, LLC Holding company USA 62.62 % 62.62 %
Concho Valley Energy, LLC Holding company USA 100.00 % 100.00 %
Concho Valley Solar, LLC Power generation USA 100.00 % 100.00 %
Yeongdeok Sunrise Wind Power Co., Ltd. Power generation Korea 70.00 % 70.00 %
UI Carbon-Neutrality Fund Holding company Korea 78.97 % 78.97 %
KA Power Limited Power generation Pakistan 100.00 % 100.00 %
Western Power Changgi Solar Co., Ltd. Power generation Korea 100.00 % 100.00 %
EWP Australia Pty., Ltd. Holding company Australia 100.00 % 100.00 %
Columboola Solar Farm Hold Co Pty., Ltd. (*3,6) Holding company Australia 74.04 % 74.04 %
Digital Innovation Growth Fund Holding company Korea 76.92 % 76.92 %
J Wind First, LLC (*7) Company specializing in liquidization Korea
KEPCO Holding Company Holding company Saudi Arabia 100.00 % 100.00 %
KEPCO for Maintenance Company Utility plant maintenance and others Saudi Arabia 100.00 % 100.00 %
KOSPO Trumbull LLC Holding company USA 100.00 % 100.00 %
Changjuk Wind Power Co., Ltd. Power generation Korea 73.00 % 73.00 %
Chile Solar JV SpA Power generation Chile 100.00 % 100.00 %
KEPCO KPS South Africa Pty., Ltd. Utility plant maintenance and others Republic of South Africa 98.96 % 98.96 %
KOWEPO Holding Limited Holding company United Arab Emirates 100.00 % 100.00 %
Magna Energy New Industrial Fund Holding company Korea 71.30 % 71.30 %
Columboola Solar Farm Nominees Pty., Ltd. (*3) Power generation Australia 100.00 % 100.00 %
Columboola Solar Farm Op Trust (*3) Power generation Australia 100.00 % 100.00 %
Columboola Solar Farm Fin Co Pty., Ltd. (*3) Holding company Australia 100.00 % 100.00 %
EWP ESS Holdings, LLC Holding company USA 100.00 % 100.00 %
Fairhaven ESS LLC Holding company USA 100.00 % 100.00 %
KOSPO Rutile, LLC Holding company USA 100.00 % 100.00 %
Sprott Chile Solar I SpA Holding company Chile 100.00 % 100.00 %

45

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

16. Consolidated Subsidiaries, Continued
(1) Consolidated subsidiaries as of March 31, 2025 and December 31, 2024 are as follows, continued:
--- ---
(*1) Considering treasury stocks, the effective percentage of ownership is 51.24%.
--- ---
(*2) The effective percentage of ownership is less than 50%. However, this subsidiary is included in the<br>consolidated financial statements as the Group obtained the majority of the voting power under the shareholders’ agreement.
--- ---
(*3) As of March 31, 2025, the annual reporting period of all subsidiaries ends on December 31, except for<br>Mira Power Limited, Columboola Solar Farm Hold Co Pty., Ltd., Columboola Solar Farm Nominees Pty., Ltd., Columboola Solar Farm Op Trust and Columboola Solar Farm Fin Co Pty., Ltd.
--- ---
(*4) The Group guarantees a certain return on investments in Commerce and Industry Energy Co., Ltd. for the<br>financial investors holding such investments. The financial investors have a right to claim the Group to sell its shares in the entity, which can be exercised 36 months after the date of acquisition.
--- ---
(*5) The effective percentage of ownership is less than 50%. However, this subsidiary is included in the<br>consolidated financial statements as the Group has control over the board of directors under the shareholders’ agreement.
--- ---
(*6) Excluding preferred stocks, the percentage of ownership with voting rights is 100%.
--- ---
(*7) Although the Group does not hold a stake as of March 31, 2025, considering the purpose and design of the<br>structured entity, the Group is exposed to volatility in the profits of the structured entity. In addition, the Group has the ability to direct activities that can most significantly affect the operations of the structured entity, so it has been<br>determined that the Group has control over the entity.
--- ---
(2) There were no subsidiaries newly included in or excluded from the scope of consolidation during thethree-month period ended March 31, 2025.
--- ---

46

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

16. Consolidated Subsidiaries, Continued
(3) The summarized financial information of consolidated subsidiaries as of and for the three-month period endedMarch 31, 2025 and for the year ended December 31, 2024 is as follows:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- ---
As of and for the three-month period endedMarch 31, 2025
Subsidiaries Total<br>assets Total<br>liabilities Sales Profit (loss)<br>for the period
Korea Hydro & Nuclear Power Co., Ltd. ~~W~~ 74,735,587 48,843,613 4,274,879 840,651
Korea South-East Power Co., Ltd. 12,967,567 6,683,111 1,644,084 109,241
Korea Midland Power Co., Ltd. 14,638,828 9,480,584 1,509,128 43,121
Korea Western Power Co., Ltd. 13,092,565 7,779,804 1,232,067 19,854
Korea Southern Power Co., Ltd. 12,896,569 7,011,834 1,397,492 80,646
Korea East-West Power Co., Ltd. 12,694,076 6,272,980 1,246,259 95,604
KEPCO Engineering & Construction Company, Inc. 896,437 295,871 96,419 65,903
KEPCO Plant Service & Engineering Co., Ltd. 1,661,846 450,044 280,689 9,923
KEPCO Nuclear Fuel Co., Ltd. 1,085,587 608,838 136,648 12,499
KEPCO KDN Co., Ltd. 819,722 332,228 155,853 8,276
KEPCO International HongKong Ltd. 149,220 1,413
KEPCO International Philippines Inc. 13,693 82 1
KEPCO Gansu International Ltd. 8,213 692
KEPCO Philippines Holdings Inc. 204,127 207 85
KEPCO Philippines Corporation 3,034 30
KEPCO Ilijan Corporation 59,212 601 (53 )
KEPCO Neimenggu International Ltd. 322,656 4,827 (92 )
KEPCO Shanxi International Ltd. 810,037 371,497 (5,937 )
KOMIPO Global Pte Ltd. 457,218 2,449 6,195
KEPCO Netherlands B.V. 155,188 88 (51 )
KEPCO Australia Pty., Ltd. 218 (10 )
KOSEP Australia Pty., Ltd. 56,480 8,636 6,891 1,493
KOMIPO Australia Pty., Ltd. 98,626 3,771 6,891 2,584
KOWEPO Australia Pty., Ltd. 98,224 3,235 6,891 3,638
KOSPO Australia Pty., Ltd. 40,107 3,754 6,891 1,318
KEPCO Middle East Holding Company 137,218 132,372 (2,135 )
Qatrana Electric Power Company 563,790 211,808 7,524 5,936
KHNP Canada Energy Ltd. 136,843 14,556 111
KEPCO Bylong Australia Pty., Ltd. 45,511 557,060 (223 )
Korea Waterbury Uranium Limited Partnership 20,773 69 (25 )
KEPCO Holdings de Mexico 1,763 3,100 (134 )
KST Electric Power Company, S.A.P.I. de C.V. 657,428 529,763 24,764 6,304
KEPCO Energy Service Company 2,871 1,014 3,156 677
KEPCO Netherlands S3 B.V. 77,900 19,044 (7 )
PT. KOMIPO Pembangkitan Jawa Bali 19,987 3,856 5,562 2,202
PT. Cirebon Power Service 3,467 1,220 2,561 70
KOWEPO International Corporation 11
KOSPO Jordan LLC 36,793 21,433 3,512 1,032
EWP America Inc. (*1) 53,070 4,399 5,909 2,497
KNF Canada Energy Limited 2,339 34 (15 )
EWP Barbados 1 SRL 479,830 1,096 7,708
Gyeonggi Green Energy Co., Ltd. 153,498 225,875 11,941 (5,787 )
PT. Tanggamus Electric Power 226,992 145,673 2,034 5,240
Gyeongju Wind Power Co., Ltd. 89,267 40,020 6,230 2,784
KOMIPO America Inc. (*2) 622,520 318,199 4,780 59
PT. EWP Indonesia 100,313 71 1,307
KEPCO Netherlands J3 B.V. 177,592 19,893 (306 )
Korea Offshore Wind Power Co., Ltd. 340,902 131,591 13,308 4,087
Global One Pioneer B.V. 1,794,197 182 (111 )
Global Energy Pioneer B.V. 362 145 (72 )
Mira Power Limited 414,307 307,590 369 (3,142 )
KOSEP Material Co., Ltd. 6,427 551 1,252 304
Commerce and Industry Energy Co., Ltd. 65,062 26,656 7,062 (1,707 )
KEPCO KPS Philippines Corp. 7,590 892 2,396 838
KOSPO Chile SpA 189,672 87,251 169

47

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

16. Consolidated Subsidiaries, Continued
(3) The summarized financial information of consolidated subsidiaries as of and for the three-month period endedMarch 31,2025 and for the year ended December 31, 2024 is as follows, continued:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- ---
As of and for the three-month period endedMarch 31, 2025
Subsidiaries Total<br>assets Total<br>liabilities Sales Profit (loss)<br>for the period
Hee Mang Sunlight Power Co., Ltd. ~~W~~ 5,900 2,366 142 13
Fujeij Wind Power Company 250,945 172,780 4,083
KOSPO Youngnam Power Co., Ltd. 375,129 265,057 102,675 2,793
Chitose Solar Power Plant LLC 93,815 90,102 3,369 (247 )
KEPCO ES Co., Ltd. 318,979 12,629 2,105 (255 )
KEPCO Solar Co., Ltd. 241,514 32,145 5,882 2,091
KOSPO Power Services Ltda. 8,268 6,619 4,116 548
Energy New Industry Specialized Investment Private Investment Trust (*3) 477,832 2,104 1,381
KOEN Bylong Pty., Ltd. 15 173
KOMIPO Bylong Pty., Ltd. 16 180 (7 )
KOWEPO Bylong Pty., Ltd. 15 175 (6 )
KOSPO Bylong Pty., Ltd. 190 421
EWP Bylong Pty., Ltd. 15 14
KOWEPO Lao International 17,438 677 3,042 1,540
KEPCO Mangilao Holdings LLC 99,393 52,560 216 7
Mangilao Investment LLC 222,507 18
KEPCO Mangilao Solar, LLC 225,562 233 4,793 1,198
Jeju Hanlim Offshore Wind Co., Ltd. 610,034 551,878 8,683 (7,817 )
PT. Siborpa Eco Power 13,832 4 (13 )
PT. Korea Energy Indonesia 8,261 5,458 421 (720 )
KOLAT SpA 50,980 701 240 (329 )
KEPCO California, LLC 52,545 7,446 343 44
KEPCO Mojave Holdings, LLC 101,866 91,763 (1,126 )
Incheon Fuel Cell Co., Ltd. 246,907 233,382 20,390 (2,448 )
KOEN Service Co., Ltd. 7,905 5,024 10,064 (45 )
KOMIPO Service Co., Ltd. 8,867 5,025 10,240 353
KOWEPO Service Co., Ltd. 9,064 5,341 10,529 256
KOSPO Service Co., Ltd. 7,087 4,142 8,578 338
EWP Service Co., Ltd. 5,462 3,858 6,959 132
PT. KOMIPO Energy Indonesia 4,216 368 1,085 51
KNF partners Co., Ltd. 2,389 850 1,187 (154 )
KOSPO USA Inc. 874,251 175 519
KOSPO Niles LLC (formerly, Nambu USA LLC) 325,811 498 (505 )
Tamra Offshore Wind Power Co., Ltd. 109,339 71,732 3,503 (330 )
KEPCO MCS Co., Ltd. 86,251 64,197 67,980 (4,370 )
KEPCO FMS Co., Ltd. 22,589 20,644 32,086 4,314
Firstkeepers Co., Ltd. 27,617 16,295 25,025 2,272
Secutec Co., Ltd. 16,071 10,918 20,152 (10 )
SE Green Energy Co., Ltd. 120,312 92,339 9,550 (527 )
Mangilao Intermediate Holdings LLC 225,784 126,521 (3,701 )
KEPCO CSC Co., Ltd. 16,144 9,772 11,386 458
KOAK Power Limited 16,702 203 16
KOMIPO Europe B.V. 89,363 155 292 (155 )
Haenanum Energy Fund 7,414 12 (9 )
Paju Ecoenergy Co., Ltd. 58,628 2,430 3,574 (309 )
Guam Ukudu Power LLC 907,515 922,583 3,863 3,586
K-SOLAR SHINAN Co., Ltd. 275,827 261,064 6,929 (1,082 )

48

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

16. Consolidated Subsidiaries, Continued
(3) The summarized financial information of consolidated subsidiaries as of and for the three-month period endedMarch 31, 2025 and for the year ended December 31, 2024 is as follows, continued:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- ---
As of and for the three-month period endedMarch 31, 2025
Subsidiaries Total<br>assets Total<br>liabilities Sales Profit (loss)<br>for the period
KPS Partners Co., Ltd. ~~W~~ 4,513 2,384 3,965 274
KEPCO E&C Service Co., Ltd. 9,037 1,868 4,558 471
Moha solar Co., Ltd. 25,941 28,464 (77 )
Ogiri Solar Power Co., Ltd. 1,073 24 (6 )
KHNP USA LLC 2,423 578 314 79
KOMIPO Vanphong Power Service LLC 40,260 1,672 7,932 3,267
Energy Innovation Fund I 40,255 1,120 (239 )
KHNP Chile SpA 6,027 4,786 (22 )
Yeong Yang Apollon Photovoltaic Co., Ltd. 1,421 1,304 44 19
Yeong Yang Corporation Co., Ltd. 1,400 1,293 42 18
SolarVader Co., Ltd. 1,411 1,297 43 18
Yeong Yang Innovation Co., Ltd. 1,399 1,293 38 13
Yeong Yang Horus Photovoltaic Co., Ltd. 1,386 1,294 36 12
Yeong Yang Solar Management Co., Ltd. 1,415 1,297 46 21
LSG Hydro Power Limited 547 8 (72 )
KOEN Bio Co., Ltd. 1,333 801 510 35
KOMIPO Iberian Solar Group, S.L.U. 80,662 72,866 357
Jeongam Wind Power Co., Ltd. 70,466 60,351 2,352 (487 )
KOWEPO Europe B.V. 36 3,685 (37 )
Yeongdeok Sunrise Wind Power Co., Ltd. 115,584 87,842 4,704 1,597
KA Power Limited 6,501 3,344 (57 )
Western Power Changgi Solar Co., Ltd. 43,000 36,763 1,551 (218 )
EWP Australia Pty., Ltd. 66,269 453 (2,070 )
Columboola Solar Farm Hold Co Pty., Ltd. (*4) 340,873 222,348 3,330 (1,723 )
Digital Innovation Growth Fund 11,011 58 1,248
J Wind First, LLC 53,704 53,704 675
KEPCO Holding Company 3,722
KEPCO for Maintenance Company 13,369 9,982 1,987 1,171
KOSPO Trumbull LLC 368,608 (10,263 )
Changjuk Wind Power Co., Ltd. 25,035 2,973 2,671 81
Chile Solar JV SpA 97,183 77,598 2,356 4,252
KEPCO KPS South Africa Pty., Ltd. 12,997 5,726 6,525 1,051
KOWEPO Holding Limited 9,036 898 (62 )
KOSPO Rutile, LLC 3,226
Sprott Chile Solar I SpA 8,661 25 2
(*1) Financial information of EWP America Inc. includes that of 4 other subsidiaries, EWP Renewable Corporation,<br>California Power Holdings LLC, EWP ESS Holdings, LLC, and Fairhaven ESS LLC.
--- ---
(*2) Financial information of KOMIPO America Inc. includes that of 17 other subsidiaries including Elara Equity<br>Holdings, LLC and CVS Equity Holdings, LLC.
--- ---
(*3) Financial information of Energy New Industry Specialized Investment Private Investment Trust includes that of 6<br>other subsidiaries, BSK E-New Industry Fund VII, e-New Industry LB Fund 1, Songhyun e-New Industry Fund, BSK E-New Industry Fund X, UI Carbon-Neutrality Fund, and Magna Energy New Industrial Fund.
--- ---
(*4) Financial information of Columboola Solar Farm Hold Co Pty., Ltd. includes that of 3 other subsidiaries<br>including Columboola Solar Farm Nominees Pty., Ltd.
--- ---

49

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

16. Consolidated Subsidiaries, Continued
(3) The summarized financial information of consolidated subsidiaries as of and for the three-month period endedMarch 31, 2025 and for the year ended December 31, 2024 is as follows, continued:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- ---
As of and for the year endedDecember 31, 2024
Subsidiaries Total assets Total<br>liabilities Sales Profit (loss)<br>for the period
Korea Hydro & Nuclear Power Co., Ltd. ~~W~~ 72,508,359 47,082,862 13,447,880 567,267
Korea South-East Power Co., Ltd. 13,203,109 6,447,903 6,527,922 382,336
Korea Midland Power Co., Ltd. 14,849,596 9,513,087 7,088,426 225,196
Korea Western Power Co., Ltd. 13,309,836 7,708,730 6,193,922 361,725
Korea Southern Power Co., Ltd. 13,184,059 7,101,465 6,430,487 311,530
Korea East-West Power Co., Ltd. 12,287,969 5,592,569 5,322,832 467,885
KEPCO Engineering & Construction Company, Inc. 945,384 367,910 553,363 58,513
KEPCO Plant Service & Engineering Co., Ltd. 1,675,776 355,479 1,534,269 170,967
KEPCO Nuclear Fuel Co., Ltd. 1,060,367 562,604 397,595 48,061
KEPCO KDN Co., Ltd. 846,361 222,119 781,646 215,791
KEPCO International HongKong Ltd. 149,757 1,611 7,596
KEPCO International Philippines Inc. 13,720 78 40,427
KEPCO Gansu International Ltd. 8,233 693 (5 )
KEPCO Philippines Holdings Inc. 202,810 173 49,999
KEPCO Philippines Corporation 2,990 4 120
KEPCO Ilijan Corporation 58,752 615 4,549
KEPCO Neimenggu International Ltd. 323,519 4,839 10,891
KEPCO Shanxi International Ltd. 811,971 366,377 13,677
KOMIPO Global Pte Ltd. 454,052 2,716 15,618
KEPCO Netherlands B.V. 155,632 109 4,237
KEPCO Australia Pty., Ltd. 226 (4,017 )
KOSEP Australia Pty., Ltd. 55,461 7,847 31,935 10,139
KOMIPO Australia Pty., Ltd. 94,760 3,214 31,935 6,253
KOWEPO Australia Pty., Ltd. 93,353 2,736 31,935 4,978
KOSPO Australia Pty., Ltd. 39,606 3,221 31,935 8,768
KEPCO Middle East Holding Company 136,740 129,721 (7,668 )
Qatrana Electric Power Company 554,387 207,773 28,465 24,062
KHNP Canada Energy Ltd. 180,220 20,431 506
KEPCO Bylong Australia Pty., Ltd. 45,420 552,861 (69,620 )
Korea Waterbury Uranium Limited Partnership 20,773 62 (142 )
KEPCO Holdings de Mexico 670 3,025 (1,032 )
KST Electric Power Company, S.A.P.I. de C.V. 654,086 532,766 67,656 24,713
KEPCO Energy Service Company 2,257 1,198 9,361 146
KEPCO Netherlands S3 B.V. 81,554 19,084 978
PT. KOMIPO Pembangkitan Jawa Bali 18,014 3,684 21,567 969
PT. Cirebon Power Service 3,004 823 10,515 586
KOWEPO International Corporation 11
KOSPO Jordan LLC 36,620 22,271 17,477 4,312
EWP America Inc. (*1) 49,381 3,120 14,888 332
KNF Canada Energy Limited 2,337 30 (67 )
EWP Barbados 1 SRL 469,387 1,463 28,937
Gyeonggi Green Energy Co., Ltd. 160,060 226,650 60,769 (31,941 )
PT. Tanggamus Electric Power 232,963 155,119 6,136 4,216
Gyeongju Wind Power Co., Ltd. 87,987 41,547 18,550 5,817
KOMIPO America Inc. (*2) 633,218 328,237 18,806 9,662
PT. EWP Indonesia 101,015 84 6,115
KEPCO Netherlands J3 B.V. 174,130 15,748 7,378
Korea Offshore Wind Power Co., Ltd. 336,687 131,463 41,489 14,607
Global One Pioneer B.V. 150 64 (130 )
Global Energy Pioneer B.V. 363 69 (131 )
Mira Power Limited 443,556 332,629 4,213 11,499
KOSEP Material Co., Ltd. 6,111 539 5,016 1,108
Commerce and Industry Energy Co., Ltd. 65,954 25,841 35,054 (3,638 )
KEPCO KPS Philippines Corp. 6,403 594 7,372 422
KOSPO Chile SpA 186,200 83,705 (1,185 )

50

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

16. Consolidated Subsidiaries, Continued
(3) The summarized financial information of consolidated subsidiaries as of and for the three-month period endedMarch 31, 2025 and for the year ended December 31, 2024 is as follows, continued:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- ---
As of and for the year endedDecember 31, 2024
Subsidiaries Totalassets Total<br>liabilities Sales Profit (loss)<br>for the period
Hee Mang Sunlight Power Co., Ltd. ~~W~~ 5,875 2,355 567 46
Fujeij Wind Power Company 245,967 171,610 14,962
KOSPO Youngnam Power Co., Ltd. 371,946 257,626 412,037 10,275
Chitose Solar Power Plant LLC 93,435 78,709 14,453 2,553
KEPCO ES Co., Ltd. 318,648 6,087 6,384 8,758
KEPCO Solar Co., Ltd. 240,555 29,240 20,788 6,210
KOSPO Power Services Ltda. 8,118 6,363 17,005 1,924
Energy New Industry Specialized Investment Private Investment Trust (*3) 483,585 3,358 22,608
KOEN Bylong Pty., Ltd. 15 165 (12 )
KOMIPO Bylong Pty., Ltd. 15 172 (17 )
KOWEPO Bylong Pty., Ltd. 15 168 (17 )
KOSPO Bylong Pty., Ltd. 202 425 (57 )
EWP Bylong Pty., Ltd. 15 13 2
KOWEPO Lao International 17,335 2,247 11,891 4,823
KEPCO Mangilao Holdings LLC 99,669 52,732 810 (7,804 )
Mangilao Investment LLC 224,646 18
KEPCO Mangilao Solar, LLC 226,509 247 16,907 3,634
Jeju Hanlim Offshore Wind Co., Ltd. 590,613 524,640 10,872 (5,067 )
PT. Siborpa Eco Power 13,877 3 (38 )
PT. Korea Energy Indonesia 9,146 5,524 4,550 1,171
KOLAT SpA 49,452 406 2,880 1,090
KEPCO California, LLC 52,627 7,464 645 (507 )
KEPCO Mojave Holdings, LLC 101,912 90,646 (3,950 )
Incheon Fuel Cell Co., Ltd. 249,022 233,049 91,097 (5,805 )
KOEN Service Co., Ltd. 10,072 7,186 39,482 323
KOMIPO Service Co., Ltd. 8,123 4,728 38,415 657
KOWEPO Service Co., Ltd. 8,422 6,678 40,875 314
KOSPO Service Co., Ltd. 7,199 4,593 32,422 949
EWP Service Co., Ltd. 5,291 3,851 27,101 27
PT. KOMIPO Energy Indonesia 5,177 1,273 6,433 874
KNF partners Co., Ltd. 2,875 1,182 6,700 286
KOSPO USA Inc. 725,984 321 (6,099 )
KOSPO Niles LLC (formerly, Nambu USA LLC) 326,651 51 9,947
Tamra Offshore Wind Power Co., Ltd. 112,747 74,809 19,937 1,551
KEPCO MCS Co., Ltd. 94,305 67,881 292,011 (9,033 )
KEPCO FMS Co., Ltd. 16,330 18,815 108,560 1,126
Firstkeepers Co., Ltd. 24,800 13,930 95,836 4,546
Secutec Co., Ltd. 17,416 11,980 78,011 1,968
SE Green Energy Co., Ltd. 126,012 93,330 41,251 178
Mangilao Intermediate Holdings LLC 230,079 126,833 (1,277 )
KEPCO CSC Co., Ltd. 17,430 11,516 49,443 2,944
KOAK Power Limited 16,961 322 (75 )
KOMIPO Europe B.V. 84,899 123 890 (6,403 )
Haenanum Energy Fund 7,415 3 493 445
Paju Ecoenergy Co., Ltd. 61,836 2,635 16,306 697
Guam Ukudu Power LLC 940,137 960,812 112,782 (39,280 )
K-SOLAR SHINAN Co., Ltd. 279,204 263,030 34,148 907

51

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

16. Consolidated Subsidiaries, Continued
(3) The summarized financial information of consolidated subsidiaries as of and for the three-month period endedMarch 31, 2025 and for the year ended December 31, 2024 is as follows, continued:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- ---
As of and for the year endedDecember 31, 2024
Subsidiaries Totalassets Total<br>liabilities Sales Profit (loss)<br>for the period
KPS Partners Co., Ltd. ~~W~~ 4,264 2,298 14,053 487
KEPCO E&C Service Co., Ltd. 8,437 1,738 16,861 1,578
Moha solar Co., Ltd. 25,946 28,391 (273 )
Ogiri Solar Power Co., Ltd. 1,077 21 77 55
KHNP USA LLC 2,170 400 1,196 186
KOMIPO Vanphong Power Service LLC 39,147 3,592 26,235 9,951
Energy Innovation Fund I 40,554 894 (899 )
KHNP Chile SpA 6,081 4,818 (60 )
Yeong Yang Apollon Photovoltaic Co., Ltd. 1,422 1,324 194 (4 )
Yeong Yang Corporation Co., Ltd. 1,403 1,314 190 (12 )
SolarVader Co., Ltd. 1,413 1,317 195 (12 )
Yeong Yang Innovation Co., Ltd. 1,407 1,314 188 1
Yeong Yang Horus Photovoltaic Co., Ltd. 1,395 1,314 184 (3 )
Yeong Yang Solar Management Co., Ltd. 1,415 1,318 198 (23 )
LSG Hydro Power Limited 629 12 (187 )
KOEN Bio Co., Ltd. 1,179 683 1,570 90
KOMIPO Iberian Solar Group, S.L.U. 76,858 69,709 (3,786 )
Jeongam Wind Power Co., Ltd. 70,772 60,170 7,094 (2,113 )
KOWEPO Europe B.V. 35 3,511 (181 )
Yeongdeok Sunrise Wind Power Co., Ltd. 112,863 87,437 7,717 3,555
KA Power Limited 6,620 3,375 (207 )
Western Power Changgi Solar Co., Ltd. 43,393 36,938 6,461 321
EWP Australia Pty., Ltd. 67,756 358 12,457
Columboola Solar Farm Hold Co Pty., Ltd. (*4) 342,603 222,480 8,349 20,622
Digital Innovation Growth Fund 11,989 172 1,745
J Wind First, LLC 54,456 54,456 2,992
KEPCO Holding Company 3,727 (35 )
KEPCO for Maintenance Company 12,192 10,078 2,726 1,838
KOSPO Trumbull LLC 336,425
Changjuk Wind Power Co., Ltd. 25,434 2,815 5,983 686
Chile Solar JV SpA 96,796 81,288 9,862 (5,411 )
KEPCO KPS South Africa Pty., Ltd. 10,784 4,688 19,713 266
KOWEPO Holding Limited 9,108 888 7,679
KOSPO Rutile, LLC 147
Sprott Chile Solar I SpA 8,682 27 1
(*1) Financial information of EWP America Inc. includes that of 4 other subsidiaries, EWP Renewable Corporation,<br>California Power Holdings LLC, EWP ESS Holdings, LLC, and Fairhaven ESS LLC.
--- ---
(*2) Financial information of KOMIPO America Inc. includes that of 17 other subsidiaries including Elara Equity<br>Holdings, LLC and CVS Equity Holdings, LLC.
--- ---
(*3) Financial information of Energy New Industry Specialized Investment Private Investment Trust includes that of 6<br>other subsidiaries, BSK E-New Industry Fund VII, e-New Industry LB Fund 1, Songhyun e-New Industry Fund, BSK E-New Industry Fund X, UI Carbon-Neutrality Fund, and Magna Energy New Industrial Fund.
--- ---
(*4) Financial information of Columboola Solar Farm Hold Co Pty., Ltd. includes that of 3 other subsidiaries<br>including Columboola Solar Farm Nominees Pty., Ltd.
--- ---

52

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

16. Consolidated Subsidiaries, Continued
(4) Significant restrictions on the Group’s abilities to its subsidiaries as of March 31, 2025 are asfollows:
--- ---
Company Nature and extent of any significantrestrictions
--- ---
Gyeonggi Green Energy Co., Ltd. Acquisition or disposal of assets of more than ~~W~~10 billion, change in the capacity of cogeneration units (except for the change due to performance improvement of equipment, maintenance) will require unanimous<br>consent of all directors of the entity.
KOSPO Youngnam Power Co., Ltd. Dividends may be payable only when all conditions of the loan agreement are satisfied. The Group’s shares cannot be wholly or partially transferred without prior written consent of financial institutions.
Jeongam Wind Power Co., Ltd. Dividends may be payable only when all conditions of the loan agreement are satisfied, and prior written consent of financial institutions is obtained. Also, payments to the contracting party may be restricted depending on the<br>financial management priority of the contract. The Group’s shares cannot be wholly or partially transferred without prior consent of other stakeholders including shareholders or financial institutions.
Incheon Fuel Cell Co., Ltd. Acquisition or disposal of assets of more than ~~W~~20 billion, change in the capacity of cogeneration units (except for the change due to performance improvement of equipment, maintenance) will require unanimous<br>consent of all directors of the entity.
Gyeongju Wind Power Co., Ltd. Dividends and settlement amounts for O&M and renewable energy certificate may be payable only when all conditions of the loan agreement are satisfied, and prior written consent of financial institutions is obtained.
Korea Offshore Wind Power Co., Ltd. Principals and interest on subordinated loans or dividends and settlement amounts for renewable energy certificate may be payable only when all conditions of the loan agreement are satisfied and prior written consent of financial<br>institutions is obtained. The Group’s equity interest in the subsidiary may not be transferred either wholly or partially without prior written consent of financial institutions.
Jeju Hanlim Offshore Wind Co., Ltd. Prior approval from the lender is required when withdrawing funds (major expenditure, REC settlement, dividend payment, etc.) according to the loan agreement.
Yeongdeok Sunrise Wind Power Co., Ltd. Dividends may be payable only when all conditions of the loan agreement are satisfied.
Columboola Solar Farm Hold Co Pty., Ltd. Dividends may be payable only when all conditions of the loan agreement are satisfied.
Guam Ukudu Power LLC Dividends may be payable only when all conditions of the loan agreement are satisfied. Disposing or transferring assets either as a whole or as a part is restricted, and the Group’s equity interest in the subsidiary may not<br>be transferred either wholly or partially without prior consent of other stakeholders including financial institutions.
Mira Power Limited The Group’s equity interest may not be transferred either wholly or partially without prior consent of other stakeholders.
Chile Solar JV SpA The Group’s equity interest may not be transferred either wholly or partially without prior consent of other stakeholders.
K-SOLAR SHINAN Co., Ltd. Dividends may be payable only when all conditions of the loan agreement are satisfied. The Group’s equity interest may not be transferred either wholly or partially without prior consent of other stakeholders until five<br>years have elapsed after the commencement of the operation.
Western Power Changgi Solar Co., Ltd. Principals and interest on subordinated loans or dividends to investors are only payable when all conditions of the loan agreement are satisfied, and prior written consent of financial institutions is obtained. Also, the<br>Group’s equity interest may not be transferred either wholly or partially without prior written consent of financial institutions.

53

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

16. Consolidated Subsidiaries, Continued
(4) Significant restrictions on the Gorup’s abilities to its subsidiaries as of March 31, 2025 are asfollows, continued:
--- ---
Company Nature and extent of any significantrestrictions
--- ---
Chitose Solar Power Plant LLC Capital expenditure may be incurred only upon prior consent of financial institutions. The issuance of securities to third parties, including current investors, is restricted, and the amount of paid-in capital cannot either<br>increase, be written off or decrease.
Mangilao Intermediate Holdings LLC Changes or termination of the O&M contract, and delays in the EPC contract may not be made without the prior written consent of the majority of the lenders, and dividends can be implemented only after repayment of the loan is<br>completed.
Fujeij Wind Power Company Incurring additional borrowings not specified in the loan agreement, or changing the PPA schedule or the EPC contract without the lender’s prior written consent is restricted. Also, commercial operation before acquiring wind<br>turbine is restricted without prior consent from the EPC contractor. In addition, capital acquisition and new share issuance other than dividends payment to investors are restricted.
Qatrana Electric Power Company Dividends payment, repayment of capital investment, and settlement for O&M can only be made when all conditions of the loan agreement are satisfied and prior consent of financial institutions is obtained.
KST Electric Power Company, S.A.P.I. de C.V. Disposal of assets exceeding $5 million per year is restricted, and the debt ratio is required to be maintained below 90%. Additionally, capital and cost expenditures that do not meet the conditions in the loan agreement are<br>restricted.
(5) As of March 31, 2025, the Group has following commitments unrecognized in relation to its subsidiariesas per its shareholders’ agreements:
--- ---
Company Unrecognized commitments
--- ---
Jeongam Wind Power Co., Ltd. When the Group requests other shareholders to transfer shares after the completion of the power generation complex, the Group has a right to purchase the shares at fair value.
Changjuk Wind Power Co., Ltd. When other shareholders want to sell their shares after the performance guarantee period of wind power generators stipulated in the equipment supply contract is completed, the Group has a right to purchase the shares at fair<br>value after consulting with the parties on the timing and size of the acquisition, taking into account financial conditions, business conditions, and other circumstances.
Columboola Solar Farm Hold Co Pty., Ltd. The Group holds a call option to purchase the shares held by another shareholder at 80% of the stock’s valuation in the event of a breach of obligation specified in the shareholder agreement.

54

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

16. Consolidated Subsidiaries, Continued
(6) Details of non-controlling interests prior to intra-company eliminations as of and for the three-monthperiod ended March 31, 2025 and for the year ended December 31, 2024 are as follows:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
As of and for the three-month period endedMarch 31, 2025
Description KEPCO IlijanCorporation KEPCO PlantService &Engineering Co.,Ltd. KEPCOEngineering &<br>ConstructionCompany, Inc. Others Total
Percentage of ownership 49.00 % 49.00 % 48.76 %
Current assets ~~W~~ 58,162 1,017,593 536,884 1,314,356 2,926,995
Non-current assets 1,050 644,253 359,553 4,662,464 5,667,320
Current liabilities (347 ) (414,086 ) (287,355 ) (1,172,613 ) (1,874,401 )
Non-current liabilities (254 ) (35,958 ) (8,516 ) (2,638,701 ) (2,683,429 )
Net assets 58,611 1,211,802 600,566 2,165,506 4,036,485
Book value of non-controlling interests 28,720 593,783 292,836 239,192 1,154,531
Sales 280,689 96,419 297,920 675,028
Profit for the period (53 ) 9,923 65,903 15,094 90,867
Profit for the period attributable to non-controlling interests (26 ) 4,862 32,134 (3,508 ) 33,462
Cash flows from operating activities 275 14,144 7,803 28,693 50,915
Cash flows from investing activities 25,868 (6,198 ) (50,555 ) (30,885 )
Cash flows from financing activities before dividends to non-controlling interests (80 ) (7,794 ) (231 ) 31,300 23,195
Dividends to non-controlling interests (2,128 ) (2,128 )
Effect of exchange rate fluctuation (135 ) 175 195 (669 ) (434 )
Net increase in cash and cash equivalents 60 32,393 1,569 6,641 40,663
In millions of won
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
As of and for the year ended2024
Description KEPCO IlijanCorporation KEPCO PlantService &Engineering Co.,Ltd. KEPCOEngineering &<br>ConstructionCompany, Inc. Others Total
Percentage of ownership 49.00 % 49.00 % 48.76 %
Current assets ~~W~~ 58,291 1,033,936 568,226 1,284,969 2,945,422
Non-current assets 461 641,840 377,158 4,814,101 5,833,560
Current liabilities (280 ) (341,918 ) (359,629 ) (1,282,746 ) (1,984,573 )
Non-current liabilities (335 ) (13,561 ) (8,281 ) (2,578,521 ) (2,600,698 )
Net assets 58,137 1,320,297 577,474 2,237,803 4,193,711
Book value of non-controlling interests 28,487 646,946 281,576 490,588 1,447,597
Sales 1,534,269 553,363 1,032,246 3,119,878
Profit for the period 4,549 170,967 58,513 120,682 354,711
Profit for the period attributable to non-controlling interests 2,229 83,774 28,531 15,736 130,270
Cash flows from operating activities 5,034 538,151 46,528 345,168 934,881
Cash flows from investing activities (379,243 ) (31,761 ) (195,587 ) (606,591 )
Cash flows from financing activities before dividends to non-controlling interests (64,696 ) (63,535 ) (11,104 ) (161,447 ) (300,782 )
Dividends to non-controlling interests (36,759 ) (47,584 ) (9,552 ) (43,321 ) (137,216 )
Effect of exchange rate fluctuation 12,321 1,362 447 28,762 42,892
Net increase (decrease) in cash and cash equivalents (84,100 ) 49,151 (5,442 ) (26,425 ) (66,816 )

55

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

16. Consolidated Subsidiaries, Continued
(7) Changes in goodwill
--- ---

(i) Details of goodwill as of March 31, 2025 and December 31, 2024 are as follows:

In millions of won As of March 31, 2025 As of December 31, 2024
Acquisition cost ~~W~~ 101,829 101,761
Less: accumulated impairment (2,582 ) (2,582 )
Carrying book value ~~W~~ 99,247 99,179

(ii) Changes in goodwill for the three-month period ended March 31, 2025 and for the year ended December 31, 2024 are as follows:

In millions of won For the three-month period ended March 31, 2025
Beginning Increase Decrease Impairment Others Ending
Acquisition cost ~~W~~ 101,761 68 101,829
Less: accumulated impairment (2,582 ) (2,582 )
Carrying book value ~~W~~ 99,179 68 99,247
In millions of won For the year ended December 31, 2024
--- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Beginning Increase Decrease Impairment Others Ending
Acquisition cost ~~W~~ 101,738 23 101,761
Less: accumulated impairment (2,582 ) (2,582 )
Carrying book value ~~W~~ 99,156 23 99,179
(8) Disposals of subsidiaries
--- ---

The Group has completed the liquidation process of PT. KOWEPO Sumsel Operation and Maintenance Services and KEPCO Lebanon SARL for the year ended December 31, 2024.

56

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

17. Investments in Associates and Joint Ventures
(1) Investments in associates and joint ventures as of March 31, 2025 and December 31, 2024 are asfollows:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- ---
March 31, 2025
Investees Key operation activities Location Percentage ofownership Acquisitioncost Book<br>value
<Associates>
Korea Gas Corporation (*1) Importing and wholesaling LNG Korea 20.47% ~~W~~ 94,500 2,339,018
Korea Electric Power Industrial Development Co., Ltd. Electricity metering and others Korea 29.00% 4,727 31,510
Hyundai Green Power Co., Ltd. Power generation equipment consignment and operation service Korea 29.00% 88,885 84,367
Korea Power Exchange (*2) Management of power market and others Korea 100.00% 127,839 272,309
Daeryun Power Co., Ltd.(*3) Power generation Korea 6.85% 46,373 32,875
SPC Power Corporation (*4) Power generation Philippines 38.00% 20,635 108,992
Gemeng International Energy Co., Ltd. Power generation China 42.00% 516,007 748,277
PT. Cirebon Electric Power Power generation Indonesia 27.50% 40,365 159,682
PT Wampu Electric Power Power generation Indonesia 46.00% 21,292 38,093
PT. Bayan Resources TBK Resources development Indonesia 20.00% 615,860 764,687
S-Power Co., Ltd. Power generation Korea 49.00% 132,300 188,613
Xe-Pian Xe-Namnoy Power Co., Ltd. Power generation Laos 25.00% 87,426 73,870
Goseong Green Power Co., Ltd. Power generation Korea 29.00% 262,740 288,386
Gangneung Eco Power Co., Ltd. Power generation Korea 29.00% 261,000 237,846
Shin Pyeongtaek Power Co., Ltd. Power generation Korea 40.00% 72,000 144,103
Dongducheon Dream Power Co., Ltd. (*5) Power generation Korea 33.61% 148,105 92,100
GS Donghae Electric Power Co., Ltd. Power generation Korea 34.00% 204,000 272,350
Nepal Water & Energy Development Company Private Limited (*6, 15) Construction and operation of utility plant Nepal 66.10% 110,332 180,274
Indeck Niles Development, LLC Holding company USA 50.00% 249,274 367,461
Saemangeum Sebit Power Plant Co., Ltd. (*7) Power generation Korea 55.14% 21,037 37,220
PT. Cirebon Energi Prasarana (*8) Power generation Indonesia 10.00% 26,710 98,867
Others (Taebaek Guinemi Wind Power Co., Ltd. and 80 others) 247,675 279,166
3,399,082 6,840,066
<Joint ventures>
Shuweihat Asia Power Investment B.V. Holding company Netherland 49.00% 44,405 83,801
KEPCO SPC Power Corporation (*4,9) Construction and operation of utility plant Philippines 60.00% 94,579 157,375
Datang Chifeng Renewable Power Co., Ltd. Power generation China 40.00% 121,928 208,660
Datang KEPCO Chaoyang Renewable Power Co., Ltd. Power generation China 40.00% 39,872 49,085
Rabigh Electricity Company (*10) Power generation Saudi Arabia 40.00% 109,743 277,467
Jamaica Public Service Company Limited Power generation Jamaica 40.00% 301,910 413,030
Amman Asia Electric Power Company (*9) Power generation Jordan 60.00% 111,476 270,219
Chun-cheon Energy Co., Ltd. Power generation Korea 29.90% 52,700 37,216
Nghi Son 2 Power LLC Power generation Vietnam 50.00% 175,261 552,622
Kelar S.A. (*9) Power generation Chile 65.00% 78,060 152,277
PT. Tanjung Power Indonesia Power generation Indonesia 35.00% 57,039 100,017
Barakah One Company (*11) Power generation UAE 18.00% 1,794,166 1,650,135
Daegu Green Power Co., Ltd. (*12) Power generation Korea 29.00% 46,225 32,005
South Jamaica Power Company Limited Power generation Jamaica 20.00% 20,430 49,791
RE Holiday Holdings LLC Power generation USA 50.00% 42,948 87,902
RE Pioneer Holdings LLC Power generation USA 50.00% 27,891 55,174
RE Barren Ridge 1 Holdings LLC Power generation USA 50.00% 28,021 58,220
Solar Philippines Calatagan Corporation Power generation Philippines 38.00% 47,903 59,150
Pulau Indah Power Plant Sdn. Bhd. Power generation Malaysia 25.00% 39,052 50,975
PT Barito Wahana Tenaga Power generation Indonesia 30.61% 59,574 216,558
Cheongna Energy Co., Ltd. (*13) Generating and distributing vapor and hot/cold water Korea 50.10% 49,344 63,828

57

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

17. Investments in Associates and Joint Ventures, Continued
(1) Investments in associates and joint ventures as of March 31, 2025 and December 31, 2024 are asfollows, continued:
--- ---
In millions of won
--- --- --- --- --- --- --- ---
March 31, 2025
Investees Key operation activities Location Percentage of<br>ownership Acquisitioncost Book<br>value
<Joint ventures>
Naepo Green Energy Co., Ltd. Power generation Korea 29.20% ~~W~~ 29,200 43,954
OneEnergy Asia Limited Power generation Vietnam 40.00% 277,887 475,705
Prime Swedish Holding AB Holding company Sweden 45.00% 35,410 38,965
Namyangju Combined Heat and Power Co., Ltd. (*13) Generating and distributing vapor and hot/cold water Korea 70.10% 124,077 120,712
Trumbull Development Partners, LLC (*14) Holding company USA 56.23% 337,898 381,829
Others (Dangjin Eco Power Co., Ltd. and 91 others) 654,147 658,429
4,801,146 6,345,101
~~W~~ 8,200,228 13,185,167
(*1) The effective percentage of ownership, including the effect of hybrid bond, is 21.66%.
--- ---
(*2) The effective percentage of ownership is 100%. However, the Government regulates the Group’s ability to<br>make operating and financial decisions over the entity, as the Government requires maintaining arms-length transactions between KPX and the Group’s other subsidiaries. Accordingly, the entity is not classified as a consolidated subsidiary. The<br>Group can exercise significant influence by virtue of right to nominate directors to the board of directors of the entity.
--- ---
(*3) The effective percentage of ownership is less than 20%. However, the Group can exercise significant influence<br>by virtue of its contractual right to appoint directors to the board of directors of the entity, and by strict decision criteria of the Group’s financial and operating policy of the board of directors.
--- ---
(*4) The Group is planning to sell its investment in SPC Power Corporation, KEPCO SPC Power Corporation and time or<br>proceeds of sales are not specified as of March 31, 2025.
--- ---
(*5) The effective percentage of ownership is 34.01% considering the conversion of redeemable convertible preferred<br>stock into ordinary stock.
--- ---
(*6) The effective percentage of ownership is more than 50% but the Group does not hold control over the entity<br>according to the shareholders’ agreement. Accordingly, the entity is classified as an associate.
--- ---
(*7) The effective percentage of ownership is more than 50% but the Group does not hold control over relevant<br>business while it exercises significant influence by participating in the Investment Decision Committee. Accordingly, the entity is classified as an associate.
--- ---
(*8) The effective percentage of ownership is less than 20%. However, the entity is classified as an associate<br>because the Group exercises significant influence over the decisions related to finance and operation.
--- ---
(*9) The effective percentage of ownership is more than 50%. However, according to the shareholders’ agreement,<br>all critical financial and operating decisions must be agreed to by all ownership parties and the Group can exercise same voting rights as other shareholders at the board of directors. Accordingly, the entities are classified as joint ventures.<br>
--- ---
(*10) The effective percentage of ownership is less than 50%. However, all critical financial and operating decisions<br>must be agreed to by all ownership parties. Accordingly, the entities are classified as joint ventures.
--- ---
(*11) The effective percentage of ownership is less than 50%. However, decisions in relevant activities must be<br>agreed by all ownership parties. Accordingly, the entity is classified as joint ventures.
--- ---
(*12) Although the nominal percentage of ownership is 29%, the effective percentage of ownership is 54.24%,<br>considering the interest of financial investors as a liability component.
--- ---
(*13) Although the Group’s effective percentage of ownership is more than 50%, the entity is classified as a<br>joint venture since the entity’s material financial and operational decisions require unanimous agreement of members in the board of directors.
--- ---
(*14) Although the Group holds more than 50% of the equity interest, the investee has been classified as a joint<br>venture, considering the minimum voting rights required by the representative committee under the joint shareholders’ agreement for decisions on significant financial and operating policies.
--- ---
(*15) The Group’s ownership interest was changed during the three-month period ended March 31, 2025, as a<br>result of a disproportionate capital contribution by a financial investor.
--- ---

58

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

17. Investments in Associates and Joint Ventures, Continued
(1) Investments in associates and joint ventures as of March 31, 2025 and December 31, 2024 are asfollows, continued:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- ---
December 31, 2024
Investees Key operation activities Location Percentage ofownership Acquisitioncost Book<br>value
<Associates>
Korea Gas Corporation (*1) Importing and wholesaling LNG Korea 20.47% ~~W~~ 94,500 2,289,304
Korea Electric Power Industrial Development Co., Ltd. Electricity metering and others Korea 29.00% 4,727 30,177
Hyundai Green Power Co., Ltd. Power generation equipment consignment and operation service Korea 29.00% 88,885 87,393
Korea Power Exchange (*2) Management of power market and others Korea 100.00% 127,839 273,962
Daeryun Power Co., Ltd.(*3) Power generation Korea 6.85% 46,373 31,093
SPC Power Corporation (*4) Power generation Philippines 38.00% 20,635 107,574
Gemeng International Energy Co., Ltd. Power generation China 42.00% 516,007 728,338
PT. Cirebon Electric Power Power generation Indonesia 27.50% 40,365 157,530
PT Wampu Electric Power Power generation Indonesia 46.00% 21,292 39,268
PT. Bayan Resources TBK Resources development Indonesia 20.00% 615,860 717,376
S-Power Co., Ltd. Power generation Korea 49.00% 132,300 180,372
Xe-Pian Xe-Namnoy Power Co., Ltd. Power generation Laos 25.00% 87,426 73,065
Goseong Green Power Co., Ltd. Power generation Korea 29.00% 262,740 284,542
Gangneung Eco Power Co., Ltd. Power generation Korea 29.00% 261,000 241,814
Shin Pyeongtaek Power Co., Ltd. Power generation Korea 40.00% 72,000 139,059
Dongducheon Dream Power Co., Ltd. (*5) Power generation Korea 33.61% 148,105 91,351
GS Donghae Electric Power Co., Ltd. Power generation Korea 34.00% 204,000 279,432
Nepal Water & Energy Development Company Private Limited (*6) Construction and operation of utility plant Nepal 68.88% 110,332 170,955
Indeck Niles Development, LLC Holding company USA 50.00% 249,274 370,970
Saemangeum Sebit Power Plant Co., Ltd. (*7) Power generation Korea 55.14% 21,037 37,110
PT. Cirebon Energi Prasarana (*8) Power generation Indonesia 10.00% 26,710 96,846
Others (Taebaek Guinemi Wind Power Co., Ltd. and 76 others) 243,426 277,223
3,394,833 6,704,754
<Joint ventures>
Shuweihat Asia Power Investment B.V. Holding company Netherland 49.00% 44,405 86,450
KEPCO SPC Power Corporation (*4,9) Construction and operation of utility plant Philippines 60.00% 94,579 159,139
Datang Chifeng Renewable Power Co., Ltd. Power generation China 40.00% 121,928 204,516
Datang KEPCO Chaoyang Renewable Power Co., Ltd. Power generation China 40.00% 39,872 48,325
Rabigh Electricity Company (*10) Power generation Saudi Arabia 40.00% 109,743 269,893
Jamaica Public Service Company Limited Power generation Jamaica 40.00% 301,910 412,616
Amman Asia Electric Power Company (*9) Power generation Jordan 60.00% 111,476 268,864
Chun-cheon Energy Co., Ltd. Power generation Korea 29.90% 52,700 36,599
Nghi Son 2 Power LLC Power generation Vietnam 50.00% 175,261 563,079
Kelar S.A. (*9) Power generation Chile 65.00% 78,060 152,367
PT. Tanjung Power Indonesia Power generation Indonesia 35.00% 57,039 100,580
Barakah One Company (*11) Power generation UAE 18.00% 118
Daegu Green Power Co., Ltd. (*12) Power generation Korea 29.00% 46,225 30,513
South Jamaica Power Company Limited Power generation Jamaica 20.00% 20,430 48,760
RE Holiday Holdings LLC Power generation USA 50.00% 42,948 89,780
RE Pioneer Holdings LLC Power generation USA 50.00% 27,891 55,622
RE Barren Ridge 1 Holdings LLC Power generation USA 50.00% 28,021 59,806
Solar Philippines Calatagan Corporation Power generation Philippines 38.00% 47,903 63,695
Pulau Indah Power Plant Sdn. Bhd. Power generation Malaysia 25.00% 39,052 50,721
PT Barito Wahana Tenaga Power generation Indonesia 30.61% 59,574 207,565
Cheongna Energy Co., Ltd. (*13) Generating and distributing vapor and hot/cold water Korea 50.10% 49,344 46,158

59

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

17. Investments in Associates and Joint Ventures, Continued
(1) Investments in associates and joint ventures as of March 31, 2025 and December 31, 2024 are asfollows, continued:
--- ---
In millions of won
--- --- --- --- --- --- --- ---
December 31, 2024
Investees Key operation activities Location Percentage ofownership Acquisitioncost Book<br>value
<Joint ventures>
Naepo Green Energy Co., Ltd. Power generation Korea 29.20% ~~W~~ 29,200 48,031
OneEnergy Asia Limited Power generation Vietnam 40.00% 258,011 465,349
Prime Swedish Holding AB Holding company Sweden 45.00% 35,410 37,559
Namyangju Combined Heat and Power Co., Ltd. (*14) Generating and distributing vapor and hot/cold water Korea 70.10% 53,977 51,768
Trumbull Development Partners, LLC Holding company USA 56.23% 304,836 355,379
Others (Dangjin Eco Power Co., Ltd. and 90 others) 651,051 668,206
2,880,964 4,581,340
~~W~~ 6,275,797 11,286,094
(*1) The effective percentage of ownership, including the effect of hybrid bond, is 21.66%.
--- ---
(*2) The effective percentage of ownership is 100%. However, the Government regulates the Group’s ability to<br>make operating and financial decisions over the entity, as the Government requires maintaining arms-length transactions between KPX and the Group’s other subsidiaries. Accordingly, the entity is not classified as a consolidated subsidiary. The<br>Group can exercise significant influence by virtue of right to nominate directors to the board of directors of the entity.
--- ---
(*3) The effective percentage of ownership is less than 20%. However, the Group can exercise significant influence<br>by virtue of its contractual right to appoint directors to the board of directors of the entity, and by strict decision criteria of the Group’s financial and operating policy of the board of directors.
--- ---
(*4) The Group is planning to sell its investment in SPC Power Corporation, KEPCO SPC Power Corporation and time or<br>proceeds of sales are not specified as of December 31, 2024.
--- ---
(*5) The effective percentage of ownership is 34.01% considering the conversion of redeemable convertible preferred<br>stock into ordinary stock.
--- ---
(*6) The effective percentage of ownership is more than 50% but the Group does not hold control over the entity<br>according to the shareholders’ agreement. Accordingly, the entity is classified as an associate.
--- ---
(*7) The effective percentage of ownership is more than 50% but the Group does not hold control over relevant<br>business while it exercises significant influence by participating in the Investment Decision Committee. Accordingly, the entity is classified as an associate.
--- ---
(*8) The effective percentage of ownership is less than 20%. However, the entity is classified as an associate<br>because the Group exercises significant influence over the decisions related to finance and operation.
--- ---
(*9) The effective percentage of ownership is more than 50%. However, according to the shareholders’ agreement,<br>all critical financial and operating decisions must be agreed to by all ownership parties and the Group can exercise same voting rights as other shareholders at the board of directors. Accordingly, the entities are classified as joint ventures.<br>
--- ---
(*10) The effective percentage of ownership is less than 50%. However, all critical financial and operating decisions<br>must be agreed to by all ownership parties. Accordingly, the entities are classified as joint ventures.
--- ---
(*11) The effective percentage of ownership is less than 50%. However, decisions in relevant activities must be<br>agreed by ownership parties. Accordingly, the entity is classified as joint ventures.
--- ---
(*12) Although the nominal percentage of ownership is 29%, the effective percentage of ownership is 54.24%,<br>considering the interest of financial investors as a liability component.
--- ---
(*13) Although the Group’s effective percentage of ownership is more than 50%, However, decisions in relevant<br>activities must be agreed by ownership parties. Accordingly, the entity is classified as joint ventures.
--- ---
(*14) Although the Group’s effective percentage of ownership is more than 50%, the entity is classified as a<br>joint venture since the entity’s material financial and operational decisions require unanimous agreement of members in the board of directors.
--- ---

60

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

17. Investments in Associates and Joint Ventures, Continued
(2) The fair values of investments in associates which are actively traded in an open market as ofMarch 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won
--- --- --- --- ---
Investees As of March 31, 2025 As of December 31, 2024
<Associates>
Korea Electric Power Industrial Development Co., Ltd. ~~W~~ 90,286 88,489
Korea Gas Corporation 673,785 655,830
SPC Power Corporation 123,570 130,063
PT. Bayan Resources TBK 11,828,101 12,298,501

61

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

17. Investments in Associates and Joint Ventures, Continued
(3) Changes in investments in associates and joint ventures for the three-month period ended March 31, 2025and for the year ended December 31, 2024 are as follows:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
For the three-month period endedMarch 31, 2025
Investees Beginningbalance Acquisition Disposals Dividendsreceived Share ofincome(loss) Othercomprehensiveincome (loss) Others Endingbalance
<Associates>
Korea Gas Corporation ~~W~~ 2,289,304 (27,500 ) 79,597 (2,076 ) (307 ) 2,339,018
Korea Electric Power Industrial Development Co., Ltd. 30,177 (3,470 ) 4,761 42 31,510
Hyundai Green Power Co., Ltd. 87,393 (3,555 ) 529 84,367
Korea Power Exchange 273,962 (1,653 ) 272,309
Daeryun Power Co., Ltd. 31,093 1,783 (1 ) 32,875
SPC Power Corporation 107,574 753 665 108,992
Gemeng International Energy Co., Ltd. 728,338 14,900 5,039 748,277
PT. Cirebon Electric Power 157,530 2,503 (351 ) 159,682
PT Wampu Electric Power 39,268 (2,005 ) 933 (103 ) 38,093
PT. Bayan Resources TBK 717,376 48,302 (939 ) (52 ) 764,687
S-Power Co., Ltd. 180,372 8,241 188,613
Xe-Pian Xe-Namnoy Power Co., Ltd. 73,065 998 (193 ) 73,870
Goseong Green Power Co., Ltd. 284,542 3,861 (17 ) 288,386
Gangneung Eco Power Co., Ltd. 241,814 (3,968 ) 237,846
Shin Pyeongtaek Power Co., Ltd. 139,059 5,044 144,103
Dongducheon Dream Power Co., Ltd. 91,351 749 92,100
GS Donghae Electric Power Co., Ltd. 279,432 (12,029 ) 4,947 272,350
Nepal Water & Energy Development Company Private Limited 170,955 8,755 564 180,274
Indeck Niles Development, LLC 370,970 (1,802 ) (799 ) (908 ) 367,461
Saemangeum Sebit Power Plant Co., Ltd. 37,110 110 37,220
PT. Cirebon Energi Prasarana 96,846 3,960 (1,730 ) (209 ) 98,867
Others (Taebaek Guinemi Wind Power Co., Ltd. and 80 others) 277,223 5,979 (1,740 ) (9,598 ) 7,326 (64 ) 40 279,166
6,704,754 5,979 (1,740 ) (58,157 ) 190,629 467 (1,866 ) 6,840,066
<Joint ventures>
Shuweihat Asia Power Investment B.V. 86,450 (290 ) 262 (2,621 ) 83,801
KEPCO SPC Power Corporation 159,139 (2,654 ) 890 157,375
Datang Chifeng Renewable Power Co., Ltd. 204,516 3,506 638 208,660
Datang KEPCO Chaoyang Renewable Power Co., Ltd. 48,325 609 151 49,085
Rabigh Electricity Company 269,893 11,755 (4,181 ) 277,467
Jamaica Public Service Company Limited 412,616 (9,700 ) 6,864 3,250 413,030
Amman Asia Electric Power Company 268,864 4,948 (3,593 ) 270,219
Chun-cheon Energy Co., Ltd. 36,599 617 37,216
Nghi Son 2 Power LLC 563,079 6,725 (17,182 ) 552,622
Kelar S.A. 152,367 (236 ) 506 (360 ) 152,277
PT. Tanjung Power Indonesia 100,580 1,431 (1,111 ) (883 ) 100,017
Barakah One Company 1,794,047 (145,546 ) 1,634 1,650,135
Daegu Green Power Co., Ltd. 30,513 1,492 32,005
South Jamaica Power Company Limited 48,760 1,135 (104 ) 49,791
RE Holiday Holdings LLC 89,780 (2,558 ) 680 87,902
RE Pioneer Holdings LLC 55,622 (1,630 ) 1,182 55,174
RE Barren Ridge 1 Holdings LLC 59,806 (1,708 ) (918 ) 1,040 58,220
Solar Philippines Calatagan Corporation 63,695 1,610 (6,155 ) 59,150
Pulau Indah Power Plant Sdn. Bhd. 50,721 67 187 50,975
PT Barito Wahana Tenaga 207,565 15,516 (6,523 ) 216,558
Cheongna Energy Co., Ltd. 46,158 17,670 63,828

62

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

17. Investments in Associates and Joint Ventures, Continued
(3) Changes in investments in associates and joint ventures for the three-month period ended March 31, 2025and for the year ended December 31, 2024 are as follows, continued:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
For the three-month period endedMarch 31, 2025
Investees Beginningbalance Acquisition Disposals Dividendsreceived Share ofincome(loss) Othercomprehensiveincome (loss) Others Endingbalance
<Joint ventures>
Naepo Green Power Co., Ltd. ~~W~~ 48,031 (13,432 ) 9,355 43,954
OneEnergy Asia Limited 465,349 19,876 4,655 (14,175 ) 475,705
Prime Swedish Holding AB 37,559 1,406 38,965
Namyangju Combined Heat and Power Co., Ltd. 51,768 70,100 (142 ) (1,014 ) 120,712
Trumbull Development Partners, LLC 355,379 33,062 (179 ) (5,454 ) (979 ) 381,829
Others (Dangjin Eco Power Co., Ltd. and 92 others) 668,206 11,459 (10,345 ) (10,099 ) 96 (7,289 ) 6,401 658,429
4,581,340 1,928,544 (10,345 ) (35,229 ) (65,550 ) (59,244 ) 5,585 6,345,101
~~W~~ 11,286,094 1,934,523 (12,085 ) (93,386 ) 125,079 (58,777 ) 3,719 13,185,167

63

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

17. Investments in Associates and Joint Ventures, Continued
(3) Changes in investments in associates and joint ventures for the three-month period ended March 31, 2025and for the year ended December 31, 2024 are as follows, continued:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
For the year ended December 31,2024
Investees Beginningbalance Acquisition Disposals Dividendsreceived Share ofincome(loss) Othercomprehensiveincome (loss) Others Endingbalance
<Associates>
Korea Gas Corporation ~~W~~ 1,970,643 248,385 36,628 33,648 2,289,304
Korea Electric Power Industrial Development Co., Ltd. 29,500 (2,801 ) 3,124 354 30,177
YTN Co., Ltd. 52,303 (52,303 )
Hyundai Green Power Co., Ltd. 118,173 (3,555 ) 2,712 (29,937 ) 87,393
Korea Power Exchange 274,286 2,768 (59 ) (3,033 ) 273,962
Daeryun Power Co., Ltd. 26,834 4,301 (42 ) 31,093
SPC Power Corporation 78,931 (13,529 ) 13,412 28,760 107,574
Gemeng International Energy Co., Ltd. 705,812 (22,908 ) (33,472 ) 78,870 36 728,338
PT. Cirebon Electric Power 134,259 4,144 19,127 157,530
PT Wampu Electric Power 34,555 (3,765 ) 3,495 152 4,831 39,268
PT. Bayan Resources TBK 619,207 (168,698 ) 187,634 79,332 (99 ) 717,376
S-Power Co., Ltd. 162,765 17,607 180,372
Xe-Pian Xe-Namnoy Power Co., Ltd. 116,378 (20,217 ) 11,861 (34,957 ) 73,065
Goseong Green Power Co., Ltd. 287,624 (3,026 ) (56 ) 284,542
Gangneung Eco Power Co., Ltd. 254,929 (13,115 ) 241,814
Shin Pyeongtaek Power Co., Ltd. 145,026 (30,080 ) 24,145 (32 ) 139,059
Dongducheon Dream Power Co., Ltd. 87,203 4,141 7 91,351
GS Donghae Electric Power Co., Ltd. 259,085 20,323 24 279,432
Nepal Water & Energy Development Company Private Limited 110,573 7,392 52,990 170,955
Indeck Niles Development, LLC 335,401 (14,551 ) (10,591 ) 12,909 47,802 370,970
Saemangeum Sebit Power Plant Co., Ltd. 37,191 (81 ) 37,110
PT. Cirebon Energi Prasarana 76,597 6,051 2,782 11,416 96,846
Others (Taebaek Guinemi Wind Power Co., Ltd. and 81 others) 259,614 18,987 (10,772 ) (10,941 ) 10,004 2,656 7,675 277,223
6,176,889 18,987 (77,626 ) (266,868 ) 502,636 341,774 8,962 6,704,754
<Joint ventures>
Shuweihat Asia Power Investment B.V. 69,902 1,709 14,839 86,450
KEPCO SPC Power Corporation 196,544 (28,591 ) 16,714 (25,528 ) 159,139
Datang Chifeng Renewable Power Co., Ltd. 186,739 (10,624 ) 7,772 20,629 204,516
Datang KEPCO Chaoyang Renewable Power Co., Ltd. 43,207 (591 ) 813 4,896 48,325
Rabigh Electricity Company 235,051 (7,270 ) 17,147 24,965 269,893
Jamaica Public Service Company Limited 349,866 (15,215 ) 28,849 49,463 (347 ) 412,616
Amman Asia Electric Power Company 223,424 (8,171 ) 20,485 33,126 268,864
Chun-cheon Energy Co., Ltd. 35,083 1,516 36,599
Nghi Son 2 Power LLC 417,989 45,889 99,201 563,079
Kelar S.A. 131,529 4,739 (2,498 ) 18,597 152,367
PT. Tanjung Power Indonesia 90,151 (8,349 ) 6,138 14,122 (1,482 ) 100,580
Barakah One Company
Daegu Green Power Co., Ltd. 26,430 4,103 (20 ) 30,513
South Jamaica Power Company Limited 43,109 (2,895 ) 2,704 5,842 48,760
RE Holiday Holdings LLC 84,092 (3,139 ) 8,827 89,780
RE Pioneer Holdings LLC 54,081 (2,910 ) 4,451 55,622
RE Barren Ridge 1 Holdings LLC 58,154 (1,966 ) (1,546 ) 5,164 59,806
Solar Philippines Calatagan Corporation 58,130 (6,107 ) 6,523 5,149 63,695
Pulau Indah Power Plant Sdn. Bhd. 25,603 14,713 (816 ) 11,221 50,721
PT Barito Wahana Tenaga 156,994 24,435 26,136 207,565
Cheongna Energy Co., Ltd. 25,549 20,609 46,158

64

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

17. Investments in Associates and Joint Ventures, Continued
(3) Changes in investments in associates and joint ventures for the three-month period ended March 31, 2025and for the year ended December 31, 2024 are as follows, continued:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
For the year ended December 31,2024
Investees Beginningbalance Acquisition Disposals Dividendsreceived Share ofincome(loss) Othercomprehensiveincome (loss) Others Endingbalance
<Joint ventures>
Naepo Green Power Co., Ltd. ~~W~~ 5,285 32,284 10,462 48,031
OneEnergy Asia Limited 289,966 62,880 47,346 65,157 465,349
Prime Swedish Holding AB 38,789 (3,782 ) 2,552 37,559
Namyangju Combined Heat and Power Co., Ltd. 3,850 50,127 (1,519 ) (690 ) 51,768
Trumbull Development Partners, LLC 304,836 7,976 42,567 355,379
Others (Dangjin Eco Power Co., Ltd. and 90 others) 636,182 22,847 (68 ) (7,730 ) (31,223 ) 46,856 1,342 668,206
3,485,699 455,403 (68 ) (97,509 ) 252,816 453,895 31,104 4,581,340
~~W~~ 9,662,588 474,390 (77,694 ) (364,377 ) 755,452 795,669 40,066 11,286,094

65

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

17. Investments in Associates and Joint Ventures, Continued
(4) The summarized financial information of associates and joint ventures as of and for the three-month periodended March 31, 2025 and for the year ended December 31, 2024 is as follows:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- ---
As of and for the three-month period endedMarch 31, 2025
Investees Total assets Total liabilities Sales Profit (loss) for<br>the period
<Associates>
Korea Gas Corporation ~~W~~ 55,481,504 44,425,962 12,732,709 367,175
Korea Electric Power Industrial Development Co., Ltd. 201,892 93,235 90,575 7,158
Hyundai Green Power Co., Ltd. 689,937 296,814 26,451 2,375
Korea Power Exchange 371,916 99,607 30,413 6,337
Daeryun Power Co., Ltd. 1,161,853 669,948 149,318 25,056
SPC Power Corporation 297,371 10,549 19,027 2,391
Gemeng International Energy Co., Ltd. 8,337,170 5,763,450 821,662 40,695
PT. Cirebon Electric Power 733,331 152,667 79,416 9,103
PT Wampu Electric Power 199,011 116,201 5,126 2,027
PT. Bayan Resources TBK 4,761,594 1,209,941 1,293,085 323,911
S-Power Co., Ltd. 685,657 298,591 202,670 16,799
Xe-Pian Xe-Namnoy Power Co., Ltd. 1,390,918 951,926 51,058 3,953
Goseong Green Power Co., Ltd. 5,050,536 4,029,961 275,367 16,049
Gangneung Eco Power Co., Ltd. 5,309,515 4,625,283 166,618 (4,524 )
Shin Pyeongtaek Power Co., Ltd. 1,112,075 725,972 219,582 12,195
Dongducheon Dream Power Co., Ltd. 1,370,207 1,062,286 348,458 2,181
GS Donghae Electric Power Co., Ltd. 1,901,079 1,100,049 124,384 14,549
Nepal Water & Energy Development Company Private Limited 662,897 391,515 6,582 (2,497 )
Indeck Niles Development, LLC 1,218,635 694,539 104,854 (2,875 )
Saemangeum Sebit Power Plant Co., Ltd. 158,865 91,527 4,713 199
PT. Cirebon Energi Prasarana 3,894,178 2,905,505 172,839 39,596
<Joint ventures>
Shuweihat Asia Power Investment B.V. 171,166 143 11,870 25
KEPCO SPC Power Corporation 288,430 26,139 34,670 (4,209 )
Datang Chifeng Renewable Power Co., Ltd. 904,769 383,118 36,969 12,236
Datang KEPCO Chaoyang Renewable Power Co., Ltd. 183,063 60,351 7,922 1,686
Rabigh Electricity Company 2,625,523 1,831,050 90,417 26,298
Jamaica Public Service Company Limited 2,644,893 1,650,814 386,309 18,575
Amman Asia Electric Power Company 761,199 310,834 6,042 8,303
Chun-cheon Energy Co., Ltd. 538,823 413,539 105,917 2,038
Nghi Son 2 Power LLC 4,280,521 3,175,277 200,389 13,015
Kelar S.A. 696,377 467,305 29,090 2,729
PT. Tanjung Power Indonesia 760,360 474,599 26,355 4,027
Barakah One Company 54,476,955 46,192,285 4,263,534 76,087
Daegu Green Power Co., Ltd. 491,874 395,447 86,100 2,984
South Jamaica Power Company Limited 536,388 287,416 71,998 5,677
RE Holiday Holdings LLC 353,365 177,561 24,294 (6,620 )
RE Pioneer Holdings LLC 268,303 157,956 16,747 (6,634 )
RE Barren Ridge 1 Holdings LLC 218,216 101,776 16,734 (3,224 )
Solar Philippines Calatagan Corporation 169,554 38,666 5,152 2,112
Pulau Indah Power Plant Sdn. Bhd. 1,059,345 878,019 55,410 324
PT Barito Wahana Tenaga 707,422 27,778
Cheongna Energy Co., Ltd. 491,699 368,201 69,735 35,267
Naepo Green Energy Co., Ltd. 740,330 601,588 116,624 27,853
OneEnergy Asia Limited 3,413,728 2,288,247 37,431 7,748
Prime Swedish Holding AB 148,855 64,984 9,239 1
Namyangju Combined Heat and Power Co., Ltd. 173,091 1,166 (203 )
Trumbull Development Partners, LLC 1,649,686 1,063,056 (223 )

66

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

17. Investments in Associates and Joint Ventures, Continued
(4) The summarized financial information of associates and joint ventures as of and for the three-month periodended March 31, 2025 and for the year ended December 31, 2024 is as follows, continued:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- ---
As of and for the year ended December 31,2024
Investees Total assets Total liabilities Sales Profit (loss) for<br>the period
<Associates>
Korea Gas Corporation ~~W~~ 57,669,638 46,843,282 38,388,740 1,148,985
Korea Electric Power Industrial Development Co., Ltd. 213,423 109,367 361,690 14,587
Hyundai Green Power Co., Ltd. 698,653 295,095 109,081 9,354
Korea Power Exchange 365,652 91,690 120,586 1,795
Daeryun Power Co., Ltd. 1,117,771 651,892 397,332 61,893
SPC Power Corporation 301,805 18,716 72,191 35,657
Gemeng International Energy Co., Ltd. 8,301,632 5,803,020 2,907,291 (66,765 )
PT. Cirebon Electric Power 742,634 169,796 281,041 15,070
PT Wampu Electric Power 209,724 124,358 19,146 7,598
PT. Bayan Resources TBK 5,338,900 2,100,603 4,700,051 1,285,816
S-Power Co., Ltd. 739,732 369,429 734,607 35,889
Xe-Pian Xe-Namnoy Power Co., Ltd. 1,414,921 979,112 182,433 (81,032 )
Goseong Green Power Co., Ltd. 5,129,641 4,125,053 1,310,775 2,823
Gangneung Eco Power Co., Ltd. 5,359,845 4,667,564 635,026 (10,547 )
Shin Pyeongtaek Power Co., Ltd. 1,052,048 678,140 841,818 58,855
Dongducheon Dream Power Co., Ltd. 1,350,004 1,044,020 1,360,809 10,453
GS Donghae Electric Power Co., Ltd. 1,910,960 1,089,101 535,012 59,776
Nepal Water & Energy Development Company Private Limited 666,316 419,386 123,848 10,732
Indeck Niles Development, LLC 1,234,170 704,296 284,855 32,491
Saemangeum Sebit Power Plant Co., Ltd. 160,225 93,086 20,376 (147 )
PT. Cirebon Energi Prasarana 3,831,992 2,863,534 543,340 60,512
<Joint ventures>
Shuweihat Asia Power Investment B.V. 176,569 137 (370 )
KEPCO SPC Power Corporation 291,538 26,307 190,296 28,108
Datang Chifeng Renewable Power Co., Ltd. 900,001 388,711 115,297 17,722
Datang KEPCO Chaoyang Renewable Power Co., Ltd. 180,827 60,016 26,678 2,031
Rabigh Electricity Company 2,651,843 1,873,439 353,677 63,270
Jamaica Public Service Company Limited 2,649,022 1,656,068 1,490,606 76,611
Amman Asia Electric Power Company 791,478 343,371 22,776 34,047
Chun-cheon Energy Co., Ltd. 533,211 409,989 430,679 4,890
Nghi Son 2 Power LLC 4,412,970 3,286,814 921,504 91,777
Kelar S.A. 715,489 486,293 112,110 9,733
PT. Tanjung Power Indonesia 754,514 467,144 106,081 17,705
Barakah One Company 43,235,235 45,056,439 1,636,730 (53,778 )
Daegu Green Power Co., Ltd. 493,595 399,918 338,750 7,344
South Jamaica Power Company Limited 532,323 288,501 250,519 14,460
RE Holiday Holdings LLC 363,750 184,188 20,251 (1,413 )
RE Pioneer Holdings LLC 272,900 161,657 13,343 (3,168 )
RE Barren Ridge 1 Holdings LLC 224,922 105,310 12,905 (1,301 )
Solar Philippines Calatagan Corporation 166,126 37,872 19,412 8,733
Pulau Indah Power Plant Sdn. Bhd. 1,054,236 873,923 40,818 (2,896 )
PT Barito Wahana Tenaga 678,043 74,744
Cheongna Energy Co., Ltd. 463,574 375,343 142,400 41,124
Naepo Green Energy Co., Ltd. 738,857 586,152 467,225 124,830
OneEnergy Asia Limited 3,237,191 2,137,600 424,036 100,781
Prime Swedish Holding AB 143,102 62,354 8,911 (8,404 )
Namyangju Combined Heat and Power Co., Ltd. 75,474 1,899 (2,410 )
Trumbull Development Partners, LLC 1,582,082 1,042,712 14,174

67

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

17. Investments in Associates and Joint Ventures, Continued
(5) The financial information of associates and joint ventures reconciled to the Group’s investments inconsolidated financial statements as of March 31, 2025 and December 31, 2024 is as follows:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
As of March 31, 2025
Investees Net assets Percentage ofownership (*) Share in<br>net assets Investment<br>differential Intercompany<br>transaction Others Book<br>value
<Associates>
Korea Gas Corporation ~~W~~ 11,055,542 21.66 % 2,394,630 (55,612 ) 2,339,018
Korea Electric Power Industrial Development Co., Ltd. 108,657 29.00 % 31,510 31,510
Hyundai Green Power Co., Ltd. 393,123 29.00 % 114,007 (29,640 ) 84,367
Korea Power Exchange 272,309 100.00 % 272,309 272,309
Daeryun Power Co., Ltd. 491,905 6.85 % 33,695 (820 ) 32,875
SPC Power Corporation 286,822 38.00 % 108,992 108,992
Gemeng International Energy Co., Ltd. 2,573,720 42.00 % 1,080,962 (332,685 ) 748,277
PT. Cirebon Electric Power 580,664 27.50 % 159,682 159,682
PT Wampu Electric Power 82,810 46.00 % 38,093 38,093
PT. Bayan Resources TBK 3,551,653 20.00 % 710,331 130,736 (76,380 ) 764,687
S-Power Co., Ltd. 387,066 49.00 % 189,662 (1,049 ) 188,613
Xe-Pian Xe-Namnoy Power Co., Ltd. 438,992 25.00 % 109,748 305 (936 ) (35,247 ) 73,870
Goseong Green Power Co., Ltd. 1,020,575 29.00 % 295,966 (7,580 ) 288,386
Gangneung Eco Power Co., Ltd. 684,232 29.00 % 198,427 46,457 (7,038 ) 237,846
Shin Pyeongtaek Power Co., Ltd. 386,103 40.00 % 154,442 3,559 (13,898 ) 144,103
Dongducheon Dream Power Co., Ltd. 307,921 34.01 % 104,724 1,757 (1,799 ) (12,582 ) 92,100
GS Donghae Electric Power Co., Ltd. 801,030 34.00 % 272,350 272,350
Nepal Water & Energy Development Company Private Limited 271,382 66.12 % 179,437 837 180,274
Indeck Niles Development, LLC 524,096 50.00 % 262,047 100,788 4,626 367,461
Saemangeum Sebit Power Plant Co., Ltd. 67,338 55.00 % 37,038 182 37,220
PT. Cirebon Energi Prasarana 988,673 10.00 % 98,867 98,867
<Joint ventures>
Shuweihat Asia Power Investment B.V. 171,023 49.00 % 83,801 83,801
KEPCO SPC Power Corporation 262,291 60.00 % 157,375 157,375
Datang Chifeng Renewable Power Co., Ltd. 521,651 40.00 % 208,660 208,660
Datang KEPCO Chaoyang Renewable Power Co., Ltd. 122,712 40.00 % 49,085 49,085
Rabigh Electricity Company 794,473 40.00 % 317,789 (39,517 ) (805 ) 277,467
Jamaica Public Service Company Limited 994,079 40.00 % 397,632 29,357 (13,959 ) 413,030
Amman Asia Electric Power Company 450,365 60.00 % 270,219 270,219
Chun-cheon Energy Co., Ltd. 125,284 29.90 % 37,461 3 (248 ) 37,216
Nghi Son 2 Power LLC 1,105,244 50.00 % 552,622 552,622
Kelar S.A. 229,072 65.00 % 148,896 3,381 152,277
PT. Tanjung Power Indonesia 285,761 35.00 % 100,017 100,017
Barakah One Company 8,284,670 18.00 % 1,491,240 158,895 1,650,135
Daegu Green Power Co., Ltd. 96,427 54.24 % 52,302 84 (20,381 ) 32,005
South Jamaica Power Company Limited 248,972 20.00 % 49,794 (3 ) 49,791
RE Holiday Holdings LLC 175,804 50.00 % 87,902 87,902
RE Pioneer Holdings LLC 110,347 50.00 % 55,174 55,174
RE Barren Ridge 1 Holdings LLC 116,440 50.00 % 58,220 58,220
Solar Philippines Calatagan Corporation 130,888 38.00 % 49,737 9,413 59,150
Pulau Indah Power Plant Sdn. Bhd. 181,326 25.00 % 45,332 5,643 50,975
PT Barito Wahana Tenaga 707,422 30.61 % 216,558 216,558
Cheongna Energy Co., Ltd. 123,498 50.10 % 61,872 3,137 (1,181 ) 63,828
Naepo Green Energy Co., Ltd. 138,742 29.20 % 40,512 3,442 43,954
OneEnergy Asia Limited 1,125,481 40.00 % 450,193 25,512 475,705
Prime Swedish Holding AB 83,871 45.00 % 37,742 1,223 38,965
Namyangju Combined Heat and Power Co., Ltd. 171,925 70.10 % 120,519 193 120,712
Trumbull Development Partners, LLC 586,630 56.23 % 329,862 51,967 381,829

68

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

17. Investments in Associates and Joint Ventures, Continued
(5) The financial information of associates and joint ventures reconciled to the Group’s investments inconsolidated financial statements as of March 31, 2025 and December 31, 2024 is as follows, continued:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
As of December 31, 2024
Investees Net assets Percentage ofownership (*) Share in<br>net assets Investment<br>differential Intercompany<br>transaction Others Book<br>value
<Associates>
Korea Gas Corporation ~~W~~ 10,826,356 21.66 % 2,344,989 (55,685 ) 2,289,304
Korea Electric Power Industrial Development Co., Ltd. 104,056 29.00 % 30,177 30,177
Hyundai Green Power Co., Ltd. 403,558 29.00 % 117,033 (29,640 ) 87,393
Korea Power Exchange 273,962 100.00 % 273,962 273,962
Daeryun Power Co., Ltd. 465,879 6.85 % 31,913 (820 ) 31,093
SPC Power Corporation 283,089 38.00 % 107,574 107,574
Gemeng International Energy Co., Ltd. 2,498,612 42.00 % 1,049,417 (321,079 ) 728,338
PT. Cirebon Electric Power 572,838 27.50 % 157,530 157,530
PT Wampu Electric Power 85,366 46.00 % 39,268 39,268
PT. Bayan Resources TBK 3,238,297 20.00 % 647,659 146,097 (76,380 ) 717,376
S-Power Co., Ltd. 370,303 49.00 % 181,448 (1,076 ) 180,372
Xe-Pian Xe-Namnoy Power Co., Ltd. 435,809 25.00 % 108,953 305 (946 ) (35,247 ) 73,065
Goseong Green Power Co., Ltd. 1,004,588 29.00 % 291,331 (6,789 ) 284,542
Gangneung Eco Power Co., Ltd. 692,281 29.00 % 200,761 46,872 (5,819 ) 241,814
Shin Pyeongtaek Power Co., Ltd. 373,908 40.00 % 149,563 3,559 (14,064 ) 1 139,059
Dongducheon Dream Power Co., Ltd. 305,984 34.01 % 104,065 1,757 (1,889 ) (12,582 ) 91,351
GS Donghae Electric Power Co., Ltd. 821,859 34.00 % 279,432 279,432
Nepal Water & Energy Development Company Private Limited 246,930 68.88 % 170,083 872 170,955
Indeck Niles Development, LLC 529,874 50.00 % 264,936 101,361 4,673 370,970
Saemangeum Sebit Power Plant Co., Ltd. 67,139 55.00 % 36,928 182 37,110
PT. Cirebon Energi Prasarana 968,458 10.00 % 96,846 96,846
<Joint ventures>
Shuweihat Asia Power Investment B.V. 176,432 49.00 % 86,450 86,450
KEPCO SPC Power Corporation 265,231 60.00 % 159,139 159,139
Datang Chifeng Renewable Power Co., Ltd. 511,290 40.00 % 204,516 204,516
Datang KEPCO Chaoyang Renewable Power Co., Ltd. 120,811 40.00 % 48,325 48,325
Rabigh Electricity Company 778,404 40.00 % 311,362 (40,752 ) (717 ) 269,893
Jamaica Public Service Company Limited 992,954 40.00 % 397,182 29,357 (13,923 ) 412,616
Amman Asia Electric Power Company 448,107 60.00 % 268,864 268,864
Chun-cheon Energy Co., Ltd. 123,222 29.90 % 36,843 3 (247 ) 36,599
Nghi Son 2 Power LLC 1,126,156 50.00 % 563,079 563,079
Kelar S.A. 229,196 65.00 % 148,978 3,389 152,367
PT. Tanjung Power Indonesia 287,370 35.00 % 100,580 100,580
Barakah One Company (1,821,204 ) 18.00 % (327,817 ) 153,104 174,713
Daegu Green Power Co., Ltd. 93,677 54.24 % 50,810 84 (20,381 ) 30,513
South Jamaica Power Company Limited 243,822 20.00 % 48,764 (4 ) 48,760
RE Holiday Holdings LLC 179,562 50.00 % 89,780 89,780
RE Pioneer Holdings LLC 111,243 50.00 % 55,622 55,622
RE Barren Ridge 1 Holdings LLC 119,612 50.00 % 59,806 59,806
Solar Philippines Calatagan Corporation 128,254 38.00 % 48,737 14,958 63,695
Pulau Indah Power Plant Sdn. Bhd. 180,313 25.00 % 45,078 5,643 50,721
PT Barito Wahana Tenaga 678,043 30.61 % 207,565 207,565
Cheongna Energy Co., Ltd. 88,231 50.10 % 44,204 3,137 (1,183 ) 46,158
Naepo Green Energy Co., Ltd. 152,705 29.20 % 44,590 3,441 48,031
OneEnergy Asia Limited 1,099,591 40.00 % 439,837 25,512 465,349
Prime Swedish Holding AB 80,748 45.00 % 36,336 1,223 37,559
Namyangju Combined Heat and Power Co., Ltd. 73,575 70.10 % 51,575 193 51,768
Trumbull Development Partners, LLC 539,370 56.23 % 303,288 52,091 355,379
(*) The percentage of ownership shown above is the effective ownership ratio that takes into account treasury<br>stocks.
--- ---

69

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

17. Investments in Associates and Joint Ventures, Continued
(6) As of March 31, 2025 and December 31, 2024, investments in associates and joint venturesunrecognized of which the book value has become nil due to the accumulated losses of associates and joint ventures are as follows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- --- --- --- --- --- --- ---
Unrecognizedequity interest Accumulated<br>unrecognizedequity interest Unrecognizedequity interest Accumulated<br>unrecognizedequity interest
Boim Combined Heat and Power Generation Co., Ltd. ~~W~~ (767 ) 27,956 769 28,723
Samcheok Eco Materials Co., Ltd. 284 5,610 895 5,326
Barakah One Company (174,713 ) 33,994 174,713
KAPES, Inc. 5,388 9,319 916 3,931
ITR Co., Ltd. (15 ) 14 15
SEP Co., Ltd. 15 15
Noeul Green Energy Co., Ltd. (325 ) 3,510 (1,377 ) 3,835
PlatformN. Co., Ltd. 2 20 (44 ) 18
KEPCO KPS CARABAO Corp. 21 265 207 244
Bitsolar Energy Co., Ltd. (129 ) 1,135 1,264 1,264
Green Energy Electricity Generation Co., Ltd. (396 ) 396 396
O2&B Global Co., Ltd. 5 11 6 6
Pulau Indah O&M Sdn. Bhd. 29 30 1 1
Foresight Iberian Solar Group Holding, S.L. 327 4,722 4,395 4,395
Green Radiation Co., Ltd., (11 ) 11 11
Hoenggye Renewable Energy Co., Ltd., (266 ) 266 266
CapMan Lynx SCA, SICAR 2,546 33,636 31,090 31,090
SureDataLab Co., Ltd. 3 3
KAS INVESTMENT I LLC 5 5
KAS INVESTMENT II LLC 5 5
Wadi Noor Solar Power Company SAOC 1,521 1,521

70

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

17. Investments in Associates and Joint Ventures, Continued
(7) As of March 31, 2025, shareholders’ agreements on investments in associates and joint venturesthat may cause future economic resource or cash outflows are as follows:
--- ---
(i) Taebaek Wind Power Co., Ltd.
--- ---

In the case where non-controlling shareholders decide to dispose of their shares in Taebaek Wind Power Co., Ltd. after the warrant period in the EPC contract of defect repair for wind power generator has expired, the Group acquires those shares at fair value. The acquisition is to be made after the conditions of the acquisition are discussed among the parties involved, with consideration of various factors such as financial status and business situation.

(ii) Pyeongchang Wind Power Co., Ltd.

In the case where non-controlling shareholders decide to dispose of their shares in Pyeongchang Wind Power Co., Ltd. after commercial operation of the power plant has started, the Group acquires those shares at fair value. The acquisition is to be made after the conditions of the acquisition are discussed among the parties involved, with the careful consideration of various factors such as financial status and business situation.

(iii) Daeryun Power Co., Ltd.

The Group reserves the right to participate in the transfer of shares in Daeryun Power Co., Ltd. on the same terms as Daeryun E&S Co., Ltd., if Daeryun E&S Co., Ltd. wishes to transfer its shares in Daeryun Power Co., Ltd.

(iv) Daegu Green Power Co., Ltd.

The Group has a right to purchase all the shares of Daegu Green Power Co., Ltd. held by the financial investors at the yield-based transfer amount agreed with the shareholders. The Group can exercise its right 5, 10 and 13 years after the date of the investment. Also, the Group has a right to purchase all or part of the shares of Daegu Green Power Co., Ltd. held by Lotte Engineering & Construction Co. at the yield-based transfer amount agreed with the shareholders.

(v) Yeonggwang Wind Power Co., Ltd.

In case the Group intends to purchase all or part of the shares from Daehan Green Energy Co., Ltd., which is a non-controlling shareholder, Daehan Green Energy Co., Ltd. has an obligation to evaluate the shares at fair value and transfer them to the Group.

(vi) Hyundai Green Power Co., Ltd.

The Group has an obligation to purchase certain shares in Hyundai Green Power Co., Ltd. from financial investors holding certain shares in Hyundai Green Power Co., Ltd. (i.e., IBK and others) when any of the financial investors claim to sell the Group’s shares at a certain point of time in the future. The Group also has the right to claim Hyundai Steel Company, another operating investor of Hyundai Green Power Co., Ltd., to sell its shares at a certain point of time in the future, and is obliged to sell the Group’s shares to Hyundai Steel Company or a third party designated by Hyundai Steel Company when Hyundai Steel Company requests the Group to sell its shares.

(vii) Omisan Wind Power Co., Ltd.

The Group has the right to claim Unison Co., Ltd. to transfer its shares in Omisan Wind Power Co., Ltd. either as a whole or as a part after the completion of the power generation complex, and if the Group exercises its right to claim transfer, Unison Co., Ltd. is obliged to transfer such shares at fair value to the Group or a third party designated by the Group.

(viii) Geumsungsan Wind Power Co., Ltd.

The Group has a right to purchase shares owned by Daemyung Energy Co., Ltd., within the range of 18%, for 3 years after the commencement of the operation.

(ix) Seokmun Green Energy

According to the special conditions of the REC trading contract, the Group may demand the sale of ownership stakes held by other investors to the Group, or the investors may acquire new stakes or modify business documents through a capital increase in Seokmun Green Energy with prior written consent from the trustee. In the event that other investors sell their stakes to the Group, they may demand that the Group purchase their stakes in the future if certain conditions are met.

71

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

17. Investments in Associates and Joint Ventures, Continued
(7) As of March 31, 2025, shareholders’ agreements on investments in associates and joint venturesthat may cause future economic resource or cash outflows are as follows, continued:
--- ---
(x) Taebaek Guinemi Wind Power Co., Ltd.
--- ---

If shareholders of Taebaek Guinemi Wind Power Co., Ltd. other than the Group intend to sell their shares after the elapse of warranty period for wind power generators specified in the EPC contract, the Group has preferential right to other parties and third parties to take over the shares that the shareholders want to sell at fair value by reaching agreement with the shareholders on the timing of sales and volume of shares to be sold considering the financial conditions, management conditions and others.

(xi) HORANG ENERGY Inc.

The Group has the right to purchase all or partial shares of HORANG ENERGY Inc. held by other shareholders after three years have elapsed from the date of commencing the operations under the unanimous agreement of all shareholders. The Group also has an obligation to sell its shares in HORANG ENERGY Inc. either as a whole or as a part to CNcore Co., Ltd. after three years have elapsed from the date of commencing the operations upon the claim of CNcore Co., Ltd., under the unanimous agreement of all shareholders.

(xii) Namyangju Combined Heat and Power Co., Ltd.

The Group has an obligation to purchase certain shares from Narae Energy Co., Ltd. at fair value when Narae Energy Co., Ltd. intends to sell its shares in Namyangju Combined Heat and Power Co., Ltd. on the exercise date agreed upon in accordance with the shareholders’ agreement. If Narae Energy Co., Ltd. becomes the largest equity holder by selling, assigning, or transferring shares in accordance with the shareholders’ agreement, the Group is obligated to guarantee the drag-along right that allows Narae Energy Co., Ltd. to sell the shares held by both shareholders under the same conditions.

(xiii) Jeongeup Green Power Co., Ltd.

The Group has the right to acquire the shares held by M Eco Co., Ltd. at fair value on the date when it has been third, seventh, and tenth year from the beginning date of commercial operation. However, if M Eco Co., Ltd. transfers its shares to the entity holding the majority of shares in M Eco Co., Ltd., its right to transfer shares to the shareholder prevails the Group’s right to acquire shares from M Eco Co., Ltd.

72

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

17. Investments in Associates and Joint Ventures, Continued
(8) Significant restrictions on the Group’s abilities on associates and joint ventures as of March 31,2025 are as follows:
--- ---
Company Nature and extent of any significantrestrictions
--- ---
Daegu Green Power Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained. Shares cannot be wholly or partially transferred without prior written consent of<br>financial institutions.
Pyeongchang Wind Power Co., Ltd. Principals and interests on subordinated loans or dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained. Shares cannot be wholly or<br>partially transferred without prior written consent of the financial institutions.
Daeryun Power Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions. Shares cannot be wholly or partially transferred without prior consent of the financial<br>institutions.
KNH Solar Co., Ltd. Shares cannot be wholly or partially transferred without the prior written consent of other shareholders.
Korea Power Engineering Service Co., Ltd. Shares cannot be wholly or partially transferred without the consent of the board of directors.
Daehan Wind Power PSC Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of the stakeholders.
Daejung Offshore Wind Power Co., Ltd. Before the commencement of the operation, shares cannot be wholly or partially transferred without the prior written consent of other shareholders.
Naepo Green Energy Co., Ltd. Dividends can only be paid to shareholders when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained. Shares cannot be wholly or partially transferred without prior<br>consent of interested parties. All or part of the stocks held cannot be transferred without the written consent of the financial institution and if the conditions for the O&M utilization rate are not met or if a payment deferment is necessary<br>due to the fulfillment of the obligation to provide funds, the contract amount will be paid in a subordinated order.
Solaseado Solar Power Co., Ltd. Principals and interests on subordinated loans or dividends can only be paid when all conditions of the shareholders’ agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of other<br>stakeholders including shareholders and financial institutions.
Samcheok Eco Materials Co., Ltd. Dividends can only be paid when all conditions of the shareholders’ agreement are satisfied. Also, shares cannot be wholly or partially transferred without the written consent of the other shareholders.
Taebaek Guinemi Wind Power Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied and consent of the financial institutions is obtained. Also, shares cannot be wholly or partially transferred without the written consent of the<br>financial institutions.
Indeck Niles Asset Management, LLC Shares cannot be wholly or partially transferred without the consent of the stakeholders.
Indeck Niles Development, LLC Shares cannot be wholly or partially transferred without the consent of the stakeholders.
Chester Solar IV SpA Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of the stakeholders.
Chester Solar V SpA Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of the stakeholders.
Diego de Almagro Solar SpA Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of the stakeholders.
Laurel SpA Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of the stakeholders.
Chester Solar I SpA Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of the stakeholders.
Kelar S.A. Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of the stakeholders.
GS Donghae Electric Power Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained.
Honam Wind Power Co., Ltd. Dividends and settlement amount for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied.
Seokmun Energy Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained. Also, principals and interests on subordinated loans can only be paid when written<br>consent of financial institutions is obtained.
Chun-cheon Energy Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, principals and interests on subordinated loans shall not be paid until the payment conditions are<br>satisfied.

73

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

17. Investments in Associates and Joint Ventures, Continued
(8) Significant restrictions on the Group’s abilities on associates or joint ventures as of March 31,2025 are as follows, continued:
--- ---
Company Nature and extent of any significantrestrictions
--- ---
Yeonggwangbaeksu Wind Power Co., Ltd. Dividends and settlement amount for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained. Also, principals and<br>interests on subordinated loans can only be paid when written consent of financial institutions is obtained.
Yeonggwang Wind Power Co., Ltd. Dividends and settlement amount for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained.
Jamaica Public Service Company Limited Dividends can only be paid when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained.
PT. Tanjung Power Indonesia Dividends can only be paid when all conditions of the loan agreement are satisfied.
Daesan Green Energy Co., Ltd. Dividends and settlement amount for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained.
Taebaek Gadeoksan Wind Power Co., Ltd. Dividends and settlement amount for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained. Also, principals and interests<br>on subordinated loans can only be paid when prior written consent of financial institutions is obtained.
Bitsolar Energy Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied.
Omisan Wind Power Co., Ltd. Principals and interests on subordinated loans or dividends can only be paid when all conditions of the loan agreement are satisfied, and prior written consent of financial institutions is obtained. Shares cannot be wholly or<br>partially transferred without the consent of the stakeholders including other shareholders financial institutions. Also, either of Korea Southern Power Co., Ltd., a subsidiary of the Group, and Unison Co., Ltd. shall not transfer their shares to<br>others wholly or partially until 4 years have passed from the completion of power complex without the written consent from the other party. In case the shares of each party become less than 10% of outstanding shares after the transfer, it also<br>requires the written consent from the other party.
Yangyang Wind Power Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained.
Busan Industrial Solar Power Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained.
Geumsungsan Wind Power Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied. Shares cannot be wholly or partially transferred for 3 years after the commencement of operation, and also cannot be transferred or disposed to the<br>third party in a way not permitted in the financial documents without prior written consent of an agent bank.
KPE green energy Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained.
Cheongju Eco Park Co., Ltd. Dividends and settlement amount for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied, or permitted by related financing contracts, or prior written consent of financial<br>institutions is obtained.
Goheung New Energy Co., Ltd. Payment of dividends or repayment of loans such as subordinated loans to the investors can only be made when all conditions of the loan agreement are satisfied, and prior written consent of financial institutions is<br>obtained.
Seokmun Green Energy Dividends and settlement amount for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained.
Trumbull Asset Management, LLC Shares cannot be either wholly or partially transferred without the consent of the stakeholders.
HORANG ENERGY Inc. Dividends can only be paid when all conditions of the loan agreement are satisfied. Shares cannot be either wholly or partially transferred before three years have passed after the commencement of operation, and also cannot be<br>transferred or disposed to the third party in a way not permitted in the financial documents without prior written consent of an agent bank.
Yanggu Floating Photovoltaic Power Plant Inc. Payment of dividends or repayment of loans such as subordinated loans to the investors can be made only when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is<br>obtained.
Hoenggye Renewable Energy Co., Ltd. Dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained.
Dongducheon Dream Power Co., Ltd. Principals and interest on subordinated loans or dividends can be paid only when all conditions of the loan agreement are satisfied. Shares cannot be either wholly or partially transferred without prior written consent of the<br>financial institutions.

74

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

17. Investments in Associates and Joint Ventures, Continued
(8) Significant restrictions on the Group’s abilities on associates or joint ventures as of March 31,2025 are as follows, continued:
--- ---
Company Nature and extent of any significantrestrictions
--- ---
Haeng Bok Do Si Photovoltaic Power Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied. Shares cannot be either wholly or partially transferred without prior consent of the stakeholders.
Shin Pyeongtaek Power Co., Ltd. Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either<br>wholly or partially transferred without prior written consent of the financial institutions.
Seoroseoro Sunny Power Plant Co., Ltd. Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either<br>wholly or partially transferred without prior written consent of the financial institutions.
Anjwa Smart Farm & Solar City Co., Ltd. Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either<br>wholly or partially transferred without prior written consent of the financial institutions.
Muan Solar Park Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied. Shares cannot be wholly or partially transferred without prior written consent of the financial institutions is obtained.
YuDang Solar Co., Ltd. Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either<br>wholly or partially transferred without prior written consent of the financial institutions.
Haemodum Solar Co., Ltd. Principals and interest payments on subordinated loans or dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained. Shares cannot be wholly or<br>partially transferred without prior written consent of the financial institutions is obtained.
Cheongna Energy Co., Ltd. Principals and interest payments on subordinated loans or dividends can only be paid when all conditions of the loan agreement are satisfied. Shares cannot be wholly or partially transferred without prior written consent of the<br>financial institutions.
Hapcheon Floating Photovoltaic Power Plant Inc. Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either<br>wholly or partially transferred without prior written consent of the financial institutions.
Yeongwol Eco Wind Co., Ltd. Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either<br>wholly or partially transferred without prior written consent of the financial institutions.
Gurae Resident Power Co., Ltd. Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either<br>wholly or partially transferred without prior written consent of the financial institutions.
Gunsan Land Solar Co., Ltd. Principals and interest payments on subordinated loans or dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained. Shares cannot be wholly or<br>partially transferred without prior written consent of the financial institutions is obtained. When the internal rate of return defined in shareholders’ agreement is met, any excessive dividend income must be provided to Gunsan City.
Eumseong Eco Park Co., Ltd. Dividends and settlement amounts for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained. Shares cannot be wholly or<br>partially transferred without prior written consent of the financial institutions.
PungBack Wind Farm Corporation Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either<br>wholly or partially transferred without prior written consent of the financial institutions.
Seobusambo highway photovoltaics Co., Ltd. Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either<br>wholly or partially transferred without prior written consent of the financial institutions.

75

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

17. Investments in Associates and Joint Ventures, Continued
(8) Significant restrictions on the Group’s abilities on associates or joint ventures as of March 31,2025 are as follows, continued:
--- ---
Company Nature and extent of any significantrestrictions
--- ---
Haman Green Energy Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained or prior written consent of financial institutions is obtained. In addition, the Group<br>cannot transfer all or part of its shares without the consent of other shareholders until five years have elapsed from the date of issuance of the acquisition notice after the comprehensive completion of the EPC contract for the project, and shares<br>cannot be wholly or partially transferred without prior written consent of the financial institutions.
Jeongeup Green Power Co., Ltd. Dividends to investors are only possible when the conditions in the loan agreement are met or prior written consent from the financial institution is obtained, and subordinated loans cannot be paid to investors before the loan<br>principal and interest are fully repaid. Additionally, all or part of the shares held cannot be transferred without the consent of other shareholders before the commencement of commercial operation of this business. The entity’s stocks may not<br>be transferred to a third party or otherwise disposed of in a manner not permitted in the financial documents without the prior written consent of the agent bank.
Nepal Water & Energy Development<br> <br>Company<br>Private Limited The Group must maintain a minimum percentage of ownership (50%) until the project completion date and thereafter.
Goseong Green Power Co., Ltd. Shares cannot be either wholly or partially transferred before the final completion date of the project without the consent of the stakeholders.
Gangneung Eco Power Co., Ltd. Shares cannot be either wholly or partially transferred until two years have elapsed from the final completion date of the project without the consent of the stakeholders.
S-Power Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied. Shares cannot be wholly or partially transferred without prior consent of the stakeholders.
South Jamaica Power Company Limited Dividends can be paid only when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained.
Rutile BESS Holdings, LLC Shares cannot be either wholly or partially transferred without prior written consent of other stakeholders.
Kumyang Eco Park Co., Ltd. Dividends and payables from settlement for renewable energy certificates can only be paid when all conditions of the loan agreement are satisfied or a prior written consent of financial institutions is obtained.
HyChangwon Fuel Cell. Co., Ltd. Principals and interests on subordinated loans or dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained. In addition, the Group cannot<br>transfer all or part of its shares until five years have elapsed from the date of issuance of the acquisition notice. Shares cannot be wholly or partially transferred without obtaining prior written consent of the financial institutions.
Roof One Energy Co., Ltd. Dividends can only be paid when all conditions prescribed in the loan agreement are satisfied. Shares cannot be wholly or partially transferred without obtaining prior consent of the stakeholders.
Amaala Sustainable Company for Energy LLC Dividends may be payable only when all conditions prescribed in the loan agreement between Amaala Sustainable Company for Energy LLC and financial institution are satisfied.
Namjeju Bitdream Energy Co., Ltd. Dividends can only be paid when all conditions prescribed in the loan agreement are satisfied. . Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.
Cheonwang Green Energy Co., Ltd. Dividends can only be paid when all conditions prescribed in the loan agreement are satisfied. . Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.
Haetbyeotgil Solar Co., Ltd. Dividends can only be paid when all conditions prescribed in the loan agreement are satisfied. Shares cannot be wholly or partially transferred without obtaining prior consent of the stakeholders.

76

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

18. Property, Plant and Equipment
(1) Property, plant and equipment as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025
--- --- --- --- --- --- --- --- --- --- --- --- --- ---
Acquisition cost Government<br>grants Accumulated<br>depreciation Accumulatedimpairment<br>losses Book<br>value
Land ~~W~~ 14,602,105 (27,402 ) (29,464 ) 14,545,239
Buildings 26,354,304 (40,696 ) (13,062,462 ) (7,103 ) 13,244,043
Structures 90,272,541 (147,251 ) (38,448,278 ) (18,678 ) 51,658,334
Machinery 123,383,900 (103,443 ) (66,665,350 ) (533,354 ) 56,081,753
Ships 17,870 (7,803 ) 10,067
Vehicles 448,419 (2,758 ) (374,572 ) (116 ) 70,973
Equipment 2,551,873 (3,386 ) (2,117,974 ) (376 ) 430,137
Tools 1,441,821 (1,313 ) (1,272,136 ) (1 ) 168,371
Construction-in-progress 33,354,799 (226,111 ) (22,795 ) 33,105,893
Right-of-use assets 6,029,082 (3,071,208 ) 2,957,874
Asset retirement costs 18,248,313 (8,679,190 ) (146,423 ) 9,422,700
Others 17,556,631 (15,406,561 ) 2,150,070
~~W~~ 334,261,658 (552,360 ) (149,105,534 ) (758,310 ) 183,845,454
In millions of won As of December 31, 2024
--- --- --- --- --- --- --- --- --- --- --- --- --- ---
Acquisition cost Government<br>grants Accumulated<br>depreciation Accumulatedimpairment<br>losses Book<br>value
Land ~~W~~ 14,577,296 (27,403 ) (29,241 ) 14,520,652
Buildings 26,217,223 (41,718 ) (12,812,659 ) (7,103 ) 13,355,743
Structures 89,573,695 (149,737 ) (37,762,078 ) (18,678 ) 51,643,202
Machinery 122,610,077 (105,546 ) (65,120,941 ) (533,405 ) 56,850,185
Ships 17,870 (7,336 ) 10,534
Vehicles 452,812 (2,745 ) (371,245 ) (116 ) 78,706
Equipment 2,512,223 (3,915 ) (2,073,752 ) (375 ) 434,181
Tools 1,428,994 (1,306 ) (1,255,257 ) (1 ) 172,430
Construction-in-progress 31,307,153 (223,566 ) (22,795 ) 31,060,792
Right-of-use assets 6,031,076 (2,984,680 ) 3,046,396
Asset retirement costs 18,283,796 (8,388,929 ) (146,423 ) 9,748,444
Others 17,198,254 (15,136,756 ) 2,061,498
~~W~~ 330,210,469 (555,936 ) (145,913,633 ) (758,137 ) 182,982,763

77

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

18. Property, Plant and Equipment, Continued
(2) Changes in property, plant and equipment for the three-month period ended March 31, 2025 and for theyear ended December 31, 2024 are as follows:
--- ---
In millions of won For the three-month period ended March 31, 2025
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Beginningbalance Acquisition Disposal Depreciation Impairment Others Ending<br>balance
Land ~~W~~ 14,548,055 273 (496 ) 24,809 14,572,641
(Government grants) (27,403 ) 1 (27,402 )
Buildings 13,397,461 92 (1,080 ) (241,531 ) 129,797 13,284,739
(Government grants) (41,718 ) 1,021 1 (40,696 )
Structures 51,792,939 16,010 (55,415 ) (744,819 ) 796,870 51,805,585
(Government grants) (149,737 ) 122 2,370 (6 ) (147,251 )
Machinery 56,955,731 67,514 (52,251 ) (1,645,608 ) 859,810 56,185,196
(Government grants) (105,546 ) 24 3,830 (1,751 ) (103,443 )
Ships 10,534 (467 ) 10,067
Vehicles 81,451 718 (35 ) (9,389 ) 986 73,731
(Government grants) (2,745 ) 6 359 (378 ) (2,758 )
Equipment 438,096 31,537 (53 ) (51,643 ) 15,586 433,523
(Government grants) (3,915 ) 529 (3,386 )
Tools 173,736 4,182 (4 ) (19,223 ) 10,993 169,684
(Government grants) (1,306 ) 106 (113 ) (1,313 )
Construction-in-progress 31,284,358 3,500,634 (1,452,988 ) 33,332,004
(Government grants) (223,566 ) 1,643 (4,188 ) (226,111 )
Right-of-use assets 3,046,396 30,693 (727 ) (127,011 ) 8,523 2,957,874
Asset retirement costs 9,748,444 (392,057 ) 66,313 9,422,700
Others 2,061,498 1,690 (269,434 ) 356,316 2,150,070
~~W~~ 182,982,763 3,654,986 (109,908 ) (3,492,967 ) 810,580 183,845,454

78

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

18. Property, Plant and Equipment, Continued
(2) Changes in property, plant and equipment for the three-month period ended March 31, 2025 and for theyear ended December 31, 2024 are as follows, continued:
--- ---
In millions of won For the year ended December 31, 2024
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Beginningbalance Acquisition Disposal Depreciation Impairment Others Ending<br>balance
Land ~~W~~ 14,398,088 28,390 (38,162 ) 159,739 14,548,055
(Government grants) (27,404 ) 1 (27,403 )
Buildings 13,360,204 3,767 (13,366 ) (984,288 ) (1,351 ) 1,032,495 13,397,461
(Government grants) (46,227 ) 4,508 1 (41,718 )
Structures 50,890,001 16,201 (303,046 ) (2,873,012 ) (9,154 ) 4,071,949 51,792,939
(Government grants) (157,881 ) 1,330 9,458 (2,644 ) (149,737 )
Machinery 53,817,046 341,652 (199,670 ) (6,311,423 ) (735 ) 9,308,861 56,955,731
(Government grants) (119,824 ) 522 16,076 (2,320 ) (105,546 )
Ships 12,365 (1,865 ) 34 10,534
Vehicles 83,374 4,311 (223 ) (43,837 ) 37,826 81,451
(Government grants) (2,837 ) 8 1,233 (1,149 ) (2,745 )
Equipment 430,875 84,020 (236 ) (210,376 ) 133,813 438,096
(Government grants) (5,932 ) 2,118 (101 ) (3,915 )
Tools 164,474 32,825 (68 ) (82,603 ) 59,108 173,736
(Government grants) (62 ) 341 (1,585 ) (1,306 )
Construction-in-progress 32,008,502 14,335,323 (15,059,467 ) 31,284,358
(Government grants) (173,474 ) 6,806 75 (56,973 ) (223,566 )
Right-of-use assets 3,363,743 132,495 (2,252 ) (538,995 ) 91,405 3,046,396
Asset retirement costs 9,733,574 (1,809,280 ) 1,824,150 9,748,444
Others 2,146,930 1,704 (1,011,161 ) 924,025 2,061,498
~~W~~ 179,875,535 14,987,494 (555,087 ) (13,833,106 ) (11,240 ) 2,519,167 182,982,763
(3) For the three-month period ended March 31, 2025, the Group’s subsidiaries including Korea<br>Hydro & Nuclear Power Co., Ltd. recognized proceeds and costs from selling items produced before the assets’ intended use. As a result, ~~W~~331 million (2024: ~~W~~57,457 million) was recognized as revenue<br>and ~~W~~669 million (2024: ~~W~~35,943 million) was recognized as cost of sales in profit or loss, respectively.
--- ---

79

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

19. Investment Properties
(1) Investment properties as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025
--- --- --- --- --- --- --- --- --- --- ---
Acquisitioncost Governmentgrants Accumulateddepreciation Book<br>value
Land ~~W~~ 198,072 198,072
Buildings 34,127 (23 ) (15,188 ) 18,916
~~W~~ 232,199 (23 ) (15,188 ) 216,988
In millions of won As of December 31, 2024
--- --- --- --- --- --- --- --- --- --- ---
Acquisitioncost Governmentgrants Accumulateddepreciation Book<br>value
Land ~~W~~ 210,509 210,509
Buildings 32,517 (22 ) (14,020 ) 18,475
~~W~~ 243,026 (22 ) (14,020 ) 228,984
(2) Changes in investment properties for the three-month period ended March 31, 2025 and for the year endedDecember 31, 2024 are as follows:
--- ---
In millions of won For the three-month period ended March 31, 2025
--- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Beginningbalance Disposal Depreciation Others Endingbalance
Land ~~W~~ 210,509 (12,437 ) 198,072
Buildings 18,497 (195 ) 637 18,939
(Government grants) (22 ) (1 ) (23 )
~~W~~ 228,984 (195 ) (11,801 ) 216,988
In millions of won For the year ended December 31, 2024
--- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Beginningbalance Disposal Depreciation Others Endingbalance
Land ~~W~~ 172,594 37,915 210,509
Buildings 12,955 (683 ) 6,225 18,497
(Government grants) (22 ) 1 (1 ) (22 )
~~W~~ 185,527 (682 ) 44,139 228,984

80

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

19. Investment Properties, Continued
(3) Income and expenses related to investment properties for the three-month periods ended March 31, 2025and 2024 are as follows:
--- ---
In millions of won For the three-month periodended March 31, 2025 For the three-month periodended March 31, 2024
--- --- --- --- --- --- ---
Rental income ~~W~~ 2,784 2,907
Operating and maintenance expenses related to rental income (201 ) (164 )
~~W~~ 2,583 2,743
(4) Fair values of investment properties as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- --- --- --- --- ---
Book value Fair value Book value Fair value
Land ~~W~~ 198,072 318,964 210,509 337,379
Buildings 18,916 19,425 18,475 19,094
~~W~~ 216,988 338,389 228,984 356,473

The Group determined the fair value of investment property on the transition date based on valuations conducted by an independent valuation firm that is independent of the Group. The valuation firm has appropriate qualifications and experience in the valuation of real estate in the Republic of Korea, and the valuation was conducted using a comparison method, which is a method of obtaining economic value based on the marketability of the property. The fair values of the investment properties as of the reporting date were determined in consideration of the fluctuation on the publicly announced individual land price after the KIFRS transition date (January 1, 2010).

(5) All of the Group’s investment properties are held under freehold interests.

81

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

20. Construction Contracts
(1) Changes in the total contract amount in which revenue is not yet recognized for the three-month period endedMarch 31, 2025 and for the year ended December 31, 2024 are as follows:
--- ---
In millions of won For the three-month period ended March 31, 2025
--- --- --- --- --- --- --- --- --- ---
Beginningbalance Increase(decrease) (*) Recognizedas<br>revenue Ending balance
Nuclear power plant construction in overseas and others ~~W~~ 6,136,773 1,379,977 (56,197 ) 7,460,553
(*) For the three-month period ended March 31, 2025, the increased balance of contracts from new orders is<br>~~W~~1,384,075 million and the decreased balance of contracts due to changes in scope of construction work and foreign exchange impact is ~~W~~ 4,098 million.
--- ---
In millions of won For the year ended December 31, 2024
--- --- --- --- --- --- --- --- --- ---
Beginningbalance Increase(decrease) (*) Recognizedas<br>revenue Ending balance
Nuclear power plant construction in overseas and others ~~W~~ 5,795,600 1,190,281 (849,108 ) 6,136,773
(*) For the year ended December 31, 2024, the increased balance of contracts from new orders is<br>~~W~~1,299,281 million and the decreased balance of contracts due to changes in scope of construction work and foreign exchange impact is ~~W~~109,000 million.
--- ---
(2) Accumulated earned revenue, expense and others related to the Group’s construction contracts inprogress as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025
--- --- --- --- --- --- --- --- --- ---
Accumulatedearned revenue Accumulated<br>expense Accumulated<br>Profit (loss) Unearned<br>advance receipts
Nuclear power plant construction in overseas and others ~~W~~ 24,236,070 24,363,236 (127,166 ) 84,780
In millions of won As of December 31, 2024
--- --- --- --- --- --- --- --- ---
Accumulatedearned revenue Accumulated<br>expense Accumulated<br>profit Unearned<br>advance receipts
Nuclear power plant construction in overseas and others ~~W~~ 24,255,432 24,008,579 246,853 80,069

82

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

20. Construction Contracts, Continued
(3) The gross amounts due from customers recognized as contract assets and due to customers recognized ascontract liabilities for contract works as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- --- --- --- --- ---
Contractassets (*1) Contractliabilities (*2) Contractassets (*1) Contractliabilities (*2)
Nuclear power plant construction in overseas and others ~~W~~ 1,164,575 307,362 1,159,085 161,778
(*1) Included in trade and other receivables, net, in the consolidated statements of financial position.<br>
--- ---
(*2) Included in non-financial liabilities as advance received in the consolidated statements of financial position.<br>The revenue recognized on March 31, 2025 from the amounts included in contract liabilities at the end of the prior year is ~~W~~10,849 million.
--- ---
(4) The contracts with purchasers state that the disclosure of information related to UAE and Egypt Eldaba nuclear<br>power plant construction projects such as rate of progress, unbilled construction, impairment losses, etc. is not allowed without consent from the purchasers. The purchasers did not agree to disclose such information. Accordingly, the Group did not<br>disclose such information based on KIFRS 1115 129.2(2) as it is probable that the purchasers may file a lawsuit for breach of contract if the Group does so. Also, the Group reported to the audit committee that those items will not be disclosed in<br>the notes to the consolidated financial statements.
--- ---
Contract date Completion date
--- --- --- --- ---
Egypt Eldaba nuclear power plant construction projects August 25, 2022 April 8, 2029
(5) The Group is in discussion with the contracting parties about the prolongation costs and liquidated damages for<br>the UAE nuclear power plant project. As of March 31, 2025, the Group recognized the amount of estimated outflow of resources embodying economic benefits related to the prolongation costs as provisions.
--- ---
(6) The operating segment information related to the contracts for which the Group recognizes revenue based onthe percentage-of-completion on a cost-based input method for the three-month period ended March 31, 2025 is as follows:
--- ---
In millions of won For the three-month period ended March 31, 2025
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Effect from changes in accounting estimates Contract assets from<br>construction contracts Trade receivables from<br>construction contracts
Expectedloss onconstructioncontracts Changes inestimates<br>of contractrevenue<br>and costs Amountsrecognizedin current<br>profit orloss Amountsrecognizedin futureprofit orloss Changes inestimated totalcontract costs Revenue<br>recognized fromperformance<br>obligations satisfiedin previous periods Gross Allowance<br>fordoubtful<br>accounts Gross Allowance<br>fordoubtful<br>accounts
Transmission and distribution ~~W~~ (44,213 ) (41,664 ) (2,549 ) 68,347 311,524 15,427
Electric power generation (Nuclear) 258,525 (1,102,508 ) (311,901 ) (790,607 ) 1,090,714 1,971 62,945
Plant maintenance & engineering Service and others 1,525 3,829 4,188 (359 ) 4,465 10,451 851,080 2 33,911 5,667
~~W~~ 260,050 (1,142,892 ) (349,377 ) (793,515 ) 1,163,526 10,451 1,164,575 15,429 96,856 5,667

83

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

21. Intangible Assets other than Goodwill
(1) Intangible assets as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025
--- --- --- --- --- --- --- --- --- --- --- --- --- ---
Acquisitioncost Governmentgrants Accumulatedamortization Accumulatedimpairmentlosses Book<br>value
Software ~~W~~ 1,171,398 (770 ) (997,487 ) (19 ) 173,122
Copyrights, patents rights and other industrial rights 107,328 (72,783 ) (9,178 ) 25,367
Mining rights 672,930 (61,658 ) (577,845 ) 33,427
Development expenditures 1,015,923 (697 ) (944,558 ) 70,668
Intangible assets under development 94,537 (3,840 ) 90,697
Usage rights of donated assets and others 592,666 (461,948 ) (136 ) 130,582
Leasehold rights 28,185 (25,402 ) (538 ) 2,245
Greenhouse gas emissions rights 149,875 149,875
Others 623,797 (206 ) (230,899 ) (12,252 ) 380,440
~~W~~ 4,456,639 (5,513 ) (2,794,735 ) (599,968 ) 1,056,423
In millions of won As of December 31, 2024
--- --- --- --- --- --- --- --- --- --- --- --- --- ---
Acquisition cost Governmentgrants Accumulatedamortization Accumulatedimpairmentlosses Book<br>value
Software ~~W~~ 1,156,641 (844 ) (976,633 ) (19 ) 179,145
Copyrights, patents rights and other industrial rights 107,040 (71,231 ) (9,178 ) 26,631
Mining rights 670,083 (66,938 ) (573,723 ) 29,422
Development expenditures 1,011,550 (939 ) (937,877 ) 72,734
Intangible assets under development 96,544 (3,473 ) (8,903 ) 84,168
Usage rights of donated assets and others 592,680 (459,165 ) (136 ) 133,379
Leasehold rights 28,185 (25,216 ) (538 ) 2,431
Greenhouse gas emissions rights 135,534 135,534
Others 620,366 (229 ) (224,410 ) (12,253 ) 383,474
~~W~~ 4,418,623 (5,485 ) (2,761,470 ) (604,750 ) 1,046,918

84

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

21. Intangible Assets other than Goodwill, Continued
(2) Changes in intangible assets for the three-month period ended March 31, 2025 and for the year endedDecember 31, 2024 are as follows:
--- ---
In millions of won For the three-month period ended March 31, 2025
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Beginningbalance Acquisition Disposal Amortization Impairment Others Endingbalance
Software ~~W~~ 179,989 2,717 (21,988 ) 13,174 173,892
(Government grants) (844 ) 74 (770 )
Copyrights, patents rights and other industrial rights 26,631 111 (13 ) (1,220 ) (142 ) 25,367
Mining rights 29,422 (467 ) (1,083 ) 5,555 33,427
Development expenditures 73,673 (6,453 ) 4,145 71,365
(Government grants) (939 ) 242 (697 )
Intangible assets under development 87,641 14,992 (8,096 ) 94,537
(Government grants) (3,473 ) (367 ) (3,840 )
Usage rights of donated assets and others 133,379 (2,797 ) 130,582
Leasehold rights 2,431 (186 ) 2,245
Greenhouse gas emissions rights 135,534 256 14,085 149,875
Others 383,703 427 (31 ) (6,911 ) 3,458 380,646
(Government grants) (229 ) 23 (206 )
~~W~~ 1,046,918 18,503 (511 ) (40,299 ) 31,812 1,056,423
In millions of won For the year ended December 31, 2024
Beginningbalance Acquisition Disposal Amortization Impairment Others Endingbalance
Software ~~W~~ 197,841 18,249 (4 ) (88,985 ) 52,888 179,989
(Government grants) (413 ) 229 (660 ) (844 )
Copyrights, patents rights and other industrial rights 23,491 576 (44 ) (4,846 ) 7,454 26,631
Mining rights 32,165 (100 ) (5,798 ) 3,155 29,422
Development expenditures 55,434 (25,830 ) 44,069 73,673
(Government grants) (2,121 ) 1,364 (182 ) (939 )
Intangible assets under development 86,013 69,878 (14 ) (68,236 ) 87,641
(Government grants) (2,458 ) (1,015 ) (3,473 )
Usage rights of donated assets and others 145,251 36 (11,903 ) (5 ) 133,379
Leasehold rights 3,929 (960 ) (538 ) 2,431
Greenhouse gas emissions rights 107,086 123 (416 ) 28,741 135,534
Others 388,088 3,997 (394 ) (26,501 ) (364 ) 18,877 383,703
(Government grants) (322 ) 93 (229 )
~~W~~ 1,033,984 92,859 (542 ) (163,567 ) (902 ) 85,086 1,046,918

85

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

21. Intangible Assets other than Goodwill, Continued
(3) Significant specific intangible assets as of March 31, 2025 and December 31, 2024 are as follows:
--- ---

In millions of won and thousands of Australian dollars

As of March 31, 2025
Type Description Currency Amount Remaining useful lives
Software S/4HANA ERP license KRW 3,910 2 years and 8 months
Copyrights, patents rights and other industrial rights Contributions to APR NRC DC KRW 11,479 2 years and 9 months
Mining rights Mining rights of Bylong mine AUD - — (*)
Usage rights of donated assets and others Sejong Haengbogdosi sharing charge KRW 7,563 1 year and 8 months
Right of use electricity and gas supply facility (Community district of Songdo) KRW 5,535 5 years and 3 months
Others Occupancy and use of public waters KRW 64,036 11 years and 10 months
Greenhouse gas emissions rights KRW 149,875
Business rights KRW 141,779 24 years and 8 months
(*)   The carrying amount of mining rights is nil, because KEPCO Australia Pty., Ltd. and KEPCO Bylong Australia Pty., Ltd. had<br>recognized impairment losses in full.
---

In millions of won and thousands of Australian dollars

As of December 31,2024
Type Description Currency Amount Remaining useful lives
Software S/4HANA ERP license KRW 4,276 2 years and 11 months
Copyrights, patents rights and other industrial rights Contributions to APR NRC DC KRW 12,523 3 years
Mining rights Mining rights of Bylong mine AUD — (*)
Usage rights of donated Sejong Haengbogdosi sharing charge KRW 8,697 1 year and 11 months
assets and others Right of use electricity and gas supply facility (Community district of Songdo) KRW 5,799 5 years and 6 months
Others Occupancy and use of public waters KRW 65,389 12 years and 1 month
Greenhouse gas emissions rights KRW 135,534
Business rights KRW 143,216 24 years and 11 months
(*)   The carrying amount of mining rights is nil, because KEPCO Australia Pty.,<br>Ltd. and KEPCO Bylong Australia Pty., Ltd. had recognized impairment losses in full.
---
(4) For the three-month periods ended March 31, 2025 and 2024, the Group recognized research and<br>development expenses of ~~W~~175,955 million and ~~W~~166,308 million, respectively.
--- ---

86

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

22. Trade and Other Payables

Trade and other payables as of March 31, 2025 and December 31, 2024 are as follows:

In millions of won As of March 31, 2025 As of December 31, 2024
Current Non-current Current Non-current
Trade payables ~~W~~ 3,813,274 4,494,504
Non-trade payables 1,998,135 1,440,388 2,224,036 1,432,421
Accrued expenses 1,840,456 22,443 1,983,697 22,259
Leasehold deposits received 4,324 2,211 3,211 3,237
Other deposits received 69,025 47,027 97,276 45,012
Lease liabilities 585,461 2,966,933 603,492 3,095,964
Dividends payable 216,110 5,063
Others (*) 26 21,782 36 10,348
~~W~~ 8,526,811 4,500,784 9,411,315 4,609,241
(*) Details of others as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- --- --- --- --- ---
Current Non-current Current Non-current
Advance received from local governments ~~W~~ 2,689 2,689
Others 26 19,093 36 7,659
~~W~~ 26 21,782 36 10,348

87

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

23. Borrowings and Debt Securities
(1) Borrowings and debt securities as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As ofMarch 31, 2025 As ofDecember 31, 2024
--- --- --- --- --- --- ---
Current liabilities
Short-term borrowings ~~W~~ 8,915,606 9,122,792
Current portion of long-term borrowings 8,691,334 8,434,330
Current portion of debt securities 25,918,186 26,908,467
Less: current portion of discount on long-term borrowings (12,399 ) (16,537 )
Less: current portion of discount on debt securities (6,879 ) (7,100 )
43,505,848 44,441,952
Non-current liabilities
Long-term borrowings 3,307,115 3,153,867
Debt securities 86,661,448 85,149,391
Less: discount on long-term borrowings (65,064 ) (35,071 )
Less: discount on debt securities (174,398 ) (176,739 )
89,729,101 88,091,448
~~W~~ 133,234,949 132,533,400
(2) Repayment schedules of borrowings and debt securities as of March 31, 2025 and December 31, 2024are as follows:
--- ---
In millions of won
--- --- --- --- ---
As of March 31, 2025
Type Borrowings Debt Securities
Less than 1 year ~~W~~ 17,606,940 25,918,186
1~ 5 years 1,243,672 65,404,357
More than 5 years 2,063,443 21,257,091
~~W~~ 20,914,055 112,579,634
In millions of won
--- --- --- --- ---
As of December 31, 2024
Type Borrowings DebtSecurities
Less than 1 year ~~W~~ 17,557,122 26,908,467
1~ 5 years 1,488,840 63,087,182
More than 5 years 1,665,027 22,062,209
~~W~~ 20,710,989 112,057,858

88

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

23. Borrowings and Debt Securities, Continued
(3) Short-term borrowings as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won and thousands of
--- --- --- --- --- --- ---
As of March 31, 2025
Type Interest rate (%) Maturity Foreign<br>currency
Local short-term borrowings 2.79 ~ 4.60 2025.04.07~2025.12.31 4,784,624
Local short-term borrowings 3M CD + 0.23 ~ 0.65 Base<br>Interest Rate for Short-term<br>Credit Line Loans + 1.03 2025.05.27~2026.02.24 3,930,000
Foreign short-term borrowings SOFR(1M) + 0.90 2025.08.12 39,879 58,483
Local bank overdraft 3.5 2025.04.24 100,000
Local bank overdraft 3.47 2025.04.07 9,500
Local bank overdraft Standard overdraft rate+1.44 2026.02.20 32,999
8,915,606

All values are in US Dollars.

In millions of won and thousands of
As of December 31, 2024
Type Interest rate (%) Maturity Foreign<br>currency
Local short-term borrowings 3.27~4.60 2025.01.07~2025.12.31 4,953,348
Local short-term borrowings 3M CD+0.23~0.65 4.17 2025.01.02~2025.11.20 3,934,600
Foreign short-term borrowings SOFR(1M)+0.90 2025.08.12 40,000 58,800
Local bank overdraft 3.85 2025.04.28 100,000
Local bank overdraft Standard overdraft rate+1.37<br>4.20 2025.02.21~2025.03.28 76,044
9,122,792

All values are in US Dollars.

89

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

23. Borrowings and Debt Securities, Continued
(4) Long-term borrowings as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won
--- --- --- --- --- --- --- ---
As of March 31, 2025
Type Interest rate (%) Maturity Foreign<br>currency Localcurrency
Local long-term borrowings
Korea Development Bank Others 0.50 2025~2044 ~~W~~ 1,342
Facility 2.60~4.94 2025~2042 50,604
Facility CB rate+0.90 2029 8,946
Hana Bank and others Commercial Paper 3M CD+0.31~1.20 2025~2029 7,950,000
Facility 4.60 2028 4,550
Facility 3yr KTB rate-1.25 2025~2028 2,330
Export-Import Bank of Korea Project loans 1.00 2026 4,419
Facility 1.32 2025~2028 60,000
Operating funds 3M bank debenture<br>rate+0.66 2026 50,000
Korea Energy Agency Development of power<br> <br>resources 3yr KTB rate-2.25<br> <br>1.75 2025~2028 7,124
Project loans - 2033 1,197
Shinhan Bank and others Facility CB rate+0.90~1.10 2028~2029 13,087
Operating funds 6M bank debenture<br>rate+0.93~1.03 2025~2027 50,000
Others 3.95 2034 66,275
Others Standard overdraft<br>rate+1.00 2034 66,275
Kookmin Bank Facility 3M CD+1.79<br> <br>5.44~5.63 2030~2037 168,776
Operating funds 1yr bank debenture<br>rate+0.78 2025 20,000
Woori Bank Facility 3M CD+1.90<br>5.12~5.44 2034~2042 99,030
IBK Facility 4.00~5.80 2042~2044 30,690
Nonghyup Bank Facility 5.53~5.63 2030~2041 39,093
Others Facility 3.30~6.80 2028~2042 809,722
Facility CB rate+1.10<br> <br>2.25~5.63 2028~2041 23,889
PF Refinancing CB rate+1.25 2030 5,487
PF Refinancing 4.10 2030 15,242
Securitized debts (*) 3M CD+1.80 2025 53,472
Others 4.40~7.90 2025~2039 113,253
Others 2.00~6.15 2031~2034 49,825
~~W~~ 9,764,628

90

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

23. Borrowings and Debt Securities, Continued
(4) Long-term borrowings as of March 31, 2025 and December 31, 2024 are as follows, continued:
--- ---
In millions of won and thousands of foreign currencies
--- --- --- --- --- --- --- ---
As of March 31, 2025
Type Interest rate (%) Foreign<br>currency
Foreign long-term borrowings
Korea Energy Agency Project loans 2026 8,744 12,823
Export-Import Bank of Korea and others Direct Loan and others TERM SOFR(6M)+1.80~3.20 2036 72,148 105,805
Direct Loan and others 6M Synthetic Libor +2.25~3.70 2027 JOD44,126 91,271
Facility SOFR+0.43SOFR(1M)+1.83 2029~2031 108,932 159,749
POSCO E&C and others Shareholder’s loan 5.60~8.00 2025~2026 9,530 13,976
Shareholder’s loan 8.00 2031 JOD4,853 10,038
NH-Amundi Syndicated Loan 8.00 2032 526,476 5,169
SMTB Syndicated Loan 6M Tibor+0.55 2025 6,500,000 63,814
Solar Construction Lending, LLC Facility 5.00 2025 28,303 41,506
Kiwoom Solar Power<br><br><br>Professional Investor<br><br><br>Private Placement<br><br><br>Investment Trust V Senior borrowing 3.90 2029 36,887 58,570
IFC and others Facility SOFR(3M)+1.60~1.99SOFR(6M)+5.005.70~6.18 2026~2032 932,013 1,366,798
Hanwha US Solar Private<br><br><br>Fund 1 and others Facility 6.00 2038 60,950 89,383
DBS Bank and others Facility 1M BBSY+1.40~2.25 2025 AUD176,670 162,655
Nonghyup Bank and others Facility 10.40 2039 35,638 52,264
2,233,821
11,998,449
Less: discount on long-term borrowings (77,463 )
Less: current portion of long-term borrowings (8,691,334 )
Add: current portion of discount on long-term borrowings 12,399
3,242,051

All values are in Japanese Yen.

(*) The main reasons for early repayment of securitized debts as of March 31, 2025 are as follows:<br>
Type Details
--- ---
Non-payment of proceeds Where the consignor fails to pay the principal to the trustee
Guarantees for supplemental funding Where the consignor fails to fulfill guarantees for supplemental funding
Additional trust obligation Where the consignor fails to fulfill the additional trust obligation
Event of default In case the event of default occurs under the ABL loan agreement

The Group is responsible for collateral obligations (fund supplementation) and liability guarantees for entrusted assets.

91

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

23. Borrowings and Debt Securities, Continued
(4) Long-term borrowings as of March 31, 2025 and December 31, 2024 are as follows, continued:
--- ---
In millions of won
--- --- --- --- --- --- --- ---
As of December 31, 2024
Type Interest rate (%) Maturity Foreign<br>currency Localcurrency
Local long-term borrowings
Korea Development Bank Others 0.50 2025~2044 ~~W~~ 1,424
Facility 2.60~4.94 2025~2042 51,960
Facility CB rate+0.90 2029 9,486
Hana Bank and others Commercial Paper 3M CD+0.31~1.20 2025~2029 7,550,000
Facility 4.60 2028 4,904
Facility 3yr KTB rate-1.25 2028 2,492
Export-Import Bank of Korea Project loans 1.00 2026 4,419
Facility 1.32 2025~2028 64,000
Operating funds 3M bank debenture<br>rate+0.66 2026 50,000
Korea Energy Agency Development of power resources 3yr KTB rate-2.25<br> <br>1.75 2025~2028 7,494
Project loans - 2033 1,197
Shinhan Bank and others Facility CB rate+0.90~1.10 2028~2029 13,995
Operating funds 6M bank debenture<br>rate+0.93~1.03 2025~2027 50,000
Others 3.95 2034 67,733
Others Standard overdraft<br>rate+1.00 2034 67,733
Kookmin Bank Facility 3M CD+1.79<br> <br>5.53~5.63 2030~2037 167,945
Operating funds 1yr bank debenture<br>rate+0.78 2025 20,000
Woori Bank Facility 3M CD+1.90<br>5.12~5.61 2034~2042 100,071
IBK Facility 4.00~5.80 2042~2044 30,690
Nonghyup Bank Facility 5.53~5.63 2030~2041 36,351
Others Facility 3.30~6.80 2028~2042 801,687
Facility CB rate+1.10<br> <br>2.25~5.63 2028~2041 24,517
PF Refinancing CB rate+1.25 2030 5,726
PF Refinancing 4.10 2030 15,905
Securitized debts (*) 3M CD+1.80 2025 54,236
Others 4.40~7.90 2025~2039 113,362
Others 2.00~6.15 2031~2034 49,826
~~W~~ 9,367,153

92

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

23. Borrowings and Debt Securities, Continued
(4) Long-term borrowings as of March 31, 2025 and December 31, 2024 are as follows, continued:
--- ---
In millions of won and thousands of foreign currencies
--- --- --- --- --- --- --- ---
As of December 31, 2024
Type Interest rate (%) Foreign<br>currency
Foreign long-term borrowings
Korea Energy Agency Project loans 2026 8,744 12,853
Export-Import Bank of Korea and others Direct Loan and others 6M Synthetic Libor+1.80~3.20 2036 72,163 106,080
Direct Loan and others 6M Synthetic Libor+2.25~3.70 2027 JOD 44,126 91,437
Facility SOFR+0.43<br>1M SOFR+1.83 2029~2031 112,672 165,628
Korea Development Bank and others EBL 1M SOFR+0.86 2025 149,592 219,900
POSCO E&C and others Shareholder’s loan 5.60~8.00 2025~2026 10,145 14,914
Shareholder’s loan 8.00 2031 JOD 4,853 10,056
Samsung Life Insurance and others Syndicated Loan 3.10~8.00 2025~2032 3,937,987 36,878
Woori Bank and others Syndicated Loan 6M Tibor+1.84 2025 2,178,069 20,397
Solar Construction Lending, LLC Facility 5.00 2025 28,303 41,605
Kiwoom Solar Power Professional Investor Private Placement Investment Trust V Senior borrowing 3.90 2029 38,139 58,304
IFC and others Facility 3M SOFR+1.60~1.996M SOFR+5.006.19~7.22 2026~2032 772,852 1,136,092
Hanwha US Solar Private<br><br><br>Fund 1 and others Facility 6.00 2038 60,743 89,292
DBS Bank and others Facility 1M BBSY+1.40~2.25 2025 AUD 178,729 163,301
Nonghyup Bank and others Facility 10.40 2039 36,943 54,307
2,221,044
11,588,197
Less: discount on long-term borrowings (51,608 )
Less: current portion of long-term borrowings (8,434,330 )
Add: current portion of discount on long-term borrowings 16,537
3,118,796

All values are in Japanese Yen.

(*) The main reasons for early repayment of securitized debts as of December 31, 2024 are as follows:<br>
Type Details
--- ---
Non-payment of proceeds Where the consignor fails to pay the principal to the trustee
Guarantees for supplemental funding Where the consignor fails to fulfill guarantees for supplemental funding
Additional trust obligation Where the consignor fails to fulfill the additional trust obligation
Event of default In case the event of default occurs under the ABL loan agreement

The Group is responsible for collateral obligations (fund supplementation) and liability guarantees for entrusted assets.

93

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

23. Borrowings and Debt Securities, Continued
(5) Local debt securities as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- --- --- --- ---
Issue date Maturity Interest rate (%) As of March 31, 2025 As ofDecember 31, 2024
Electricity Bonds 2012.03.27~2025.03.27 2025.04.04~2052.04.21 1.43~5.99 ~~W~~ 63,190,000 63,960,000
Corporate Bonds (*) 2009.10.16~2025.03.31 2025.04.22~2054.06.28 1.28~10.00 29,687,353 28,727,353
Corporate Bonds 2021.05.26~2023.12.28 2041.05.25~2043.09.15 1.71~3.78 41,578 41,578
92,918,931 92,728,931
Less: discount on local debt securities (54,199 ) (51,149 )
Less: current portion of local debt securities (20,981,584 ) (22,621,584 )
Add: current portion of discount on local debt securities 2,023 2,124
~~W~~ 71,885,171 70,058,322
(*) Among the corporate bonds, each holder of Hee Mang Sunlight Power Co., Ltd.’s private equity bonds,<br>amounting to ~~W~~1,584 million, may exercise the early redemption rights on the 5th year (March 31, 2021) from the date of issuance of the bonds and every year on March 31 thereafter, until the year before the redemption date.<br>
--- ---

94

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

23. Borrowings and Debt Securities, Continued
(6) Foreign debt securities as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won and thousands of foreign currencies
--- --- --- --- --- --- --- --- ---
March 31, 2025
Type Issue date Maturity Interest rate (%) Foreign<br>currency Local<br>currency
FY-96 1996.04.01~1996.12.06 2026.12.01~2096.04.01 6.00~7.95 USD 278,701 ~~W~~ 408,715
FY-97 1997.01.31~1997.08.04 2027.02.01~2027.08.01 6.75~7.00 USD 314,717 461,532
FY-04 2004.04.23 2034.04.23 5.13 USD 286,920 420,768
FY-14 2014.07.30 2029.07.30 3.57 USD 100,000 146,650
FY-15 2015.06.15 2025.06.15 3.25 USD 300,000 439,950
FY-17 2017.07.25 2027.07.25 3.13 USD 300,000 439,950
FY-17 2017.10.30 2037.10.30 1.70 EUR 40,000 63,514
FY-17 2017.11.16 2037.11.16 2.36 SEK 450,000 65,898
FY-18 2018.03.13 2028.03.13 3.35 HKD 1,650,000 311,075
FY-19 2019.07.19 2027.07.19 0.05 CHF 100,000 166,581
FY-19 2019.12.19 2037.12.31 3.30~5.70 USD 326,929 479,442
FY-20 2020.05.06 2025.05.06 1.75 USD 500,000 733,250
FY-20 2020.06.15 2025.06.15 1.13 USD 500,000 733,250
FY-20 2020.08.03 2026.02.03 1.00 USD 300,000 439,950
FY-21 2021.01.27 2026.01.27 0.75 USD 450,000 659,925
FY-21 2021.04.27 2026.04.27 1.25 USD 500,000 733,250
FY-21 2021.08.09 2026.08.09 1.25 USD 300,000 439,950
FY-21 2021.09.24 2026.09.24 1.13 USD 300,000 439,950
FY-22 2022.04.21 2027.04.21 3.63 USD 300,000 439,950
FY-22 2022.05.06 2025.05.06 3.60 USD 500,000 733,250
FY-22 2022.06.14 2025.06.14~2027.06.14 3.63~4.00 USD 800,000 1,173,200
FY-22 2022.06.28 2025.06.28 4.13 USD 300,000 439,950
FY-22 2022.07.27 2027.07.27 4.25 USD 700,000 1,026,550
FY-22 2022.10.06 2026.04.06~2028.04.06 5.38~5.50 USD 800,000 1,173,200
FY-22 2022.10.06~2022.11.01 2032.10.06 5.16 HKD 2,350,000 443,046
FY-23 2023.06.07 2030.06.07 4.51 HKD 1,037,000 195,506
FY-23 2023.07.12 2028.07.12 4.88 USD 350,000 513,275
FY-23 2023.07.18 2028.07.18 5.00 USD 500,000 733,250
FY-23 2023.07.31 2026.07.31 5.38 USD 1,000,000 1,466,500
FY-23 2023.09.21 2026.09.21 5.38 USD 300,000 439,950
FY-24 2024.01.31 2027.01.31 4.88 USD 1,200,000 1,759,800
FY-24 2024.07.29 2029.07.29 4.63 USD 500,000 733,250
FY-25 2025.02.13 2028.02.13 4.75 USD 400,000 586,600
FY-25 2025.03.05 2028.03.05 4.10 HKD 1,166,000 219,826
19,660,703
Less: discount on foreign debt securities (127,078 )
Less: current portion of foreign debt securities (4,936,602 )
Add: current portion of discount on foreign debt securities 4,856
~~W~~ 14,601,879

95

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

23. Borrowings and Debt Securities, Continued
(6) Foreign debt securities as of March 31, 2025 and December 31, 2024 are as follows, continued:
--- ---
In millions of won and thousands of foreign currencies
--- --- --- --- --- --- --- --- ---
As of December 31, 2024
Type Issue date Maturity Interest rate (%) Foreign<br>currency Local<br>currency
FY-96 1996.04.01~1996.12.06 2026.12.01~2096.04.01 6.00~7.95 USD 278,701 ~~W~~ 409,690
FY-97 1997.01.31~1997.08.04 2027.02.01~2027.08.01 6.75~7.00 USD 314,717 462,634
FY-04 2004.04.23 2034.04.23 5.13 USD 286,920 421,772
FY-14 2014.07.30 2029.07.30 3.57 USD 100,000 147,000
FY-15 2015.06.15 2025.06.15 3.25 USD 300,000 441,000
FY-17 2017.07.25 2027.07.25 3.13 USD 300,000 441,000
FY-17 2017.10.30 2037.10.30 1.70 EUR 40,000 61,149
FY-17 2017.11.16 2037.11.16 2.36 SEK 450,000 59,954
FY-18 2018.03.13 2028.03.13 3.35 HKD 1,650,000 312,345
FY-19 2019.07.19 2027.07.19 0.05 CHF 100,000 162,638
FY-19 2019.12.19 2037.12.31 3.30~5.70 USD 326,929 480,586
FY-20 2020.02.03 2025.02.03 2.13 USD 300,000 441,000
FY-20 2020.05.06 2025.05.06 1.75 USD 500,000 735,000
FY-20 2020.06.15 2025.06.15 1.13 USD 500,000 735,000
FY-20 2020.08.03 2026.02.03 1.00 USD 300,000 441,000
FY-21 2021.01.27 2026.01.27 0.75 USD 450,000 661,500
FY-21 2021.04.27 2026.04.27 1.25 USD 500,000 735,000
FY-21 2021.08.09 2026.08.09 1.25 USD 300,000 441,000
FY-21 2021.09.24 2026.09.24 1.13 USD 300,000 441,000
FY-22 2022.04.21 2027.04.21 3.63 USD 300,000 441,000
FY-22 2022.05.06 2025.05.06 3.60 USD 500,000 735,000
FY-22 2022.06.14 2025.06.14~2027.06.14 3.63~4.00 USD 800,000 1,176,000
FY-22 2022.06.28 2025.06.28 4.13 USD 300,000 441,000
FY-22 2022.07.27 2027.07.27 4.25 USD 700,000 1,029,000
FY-22 2022.10.06 2026.04.06~2028.04.06 5.38~5.50 USD 800,000 1,176,000
FY-22 2022.10.06~2022.11.01 2032.10.06 5.16 HKD 2,350,000 444,855
FY-23 2023.06.07 2030.06.07 4.51 HKD 1,037,000 196,304
FY-23 2023.07.12 2028.07.12 4.88 USD 350,000 514,500
FY-23 2023.07.18 2028.07.18 5.00 USD 500,000 735,000
FY-23 2023.07.31 2026.07.31 5.38 USD 1,000,000 1,470,000
FY-23 2023.09.21 2026.09.21 5.38 USD 300,000 441,000
FY-24 2024.01.31 2027.01.31 4.88 USD 1,200,000 1,764,000
FY-24 2024.07.29 2029.07.29 4.63 USD 500,000 735,000
19,328,927
Less: discount on foreign debt securities (132,690 )
Less: current portion of foreign debt securities (4,286,883 )
Add: current portion of discount on foreign debt securities 4,976
~~W~~ 14,914,330
(7) Changes in borrowings and debt securities for the three-month periods ended March 31, 2025 and 2024 areas follows:
--- ---
In millions of won For the three-month period ended March 31, 2025 For the three-month period ended March 31, 2024
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Borrowings Debt<br>Securities Total Borrowings Debt<br>Securities Total
Beginning balance ~~W~~ 20,659,381 111,874,019 132,533,400 19,839,652 113,792,178 133,631,830
Cash flow 206,872 538,688 745,560 (3,739,385 ) (211,266 ) (3,950,651 )
Effect of exchange rate fluctuations (3,806 ) (16,914 ) (20,720 ) 69,556 687,938 757,494
Others (25,855 ) 2,564 (23,291 ) 74 (5,863 ) (5,789 )
~~W~~ 20,836,592 112,398,357 133,234,949 16,169,897 114,262,987 130,432,884

96

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

24. Lease
1) Group as a lessee
--- ---
(1) Finance lease contracts
--- ---

The Group applies the short-term leases recognition exemption to its lease contracts that have a lease term of 12 months or less from the commencement date, and recognized ~~W~~21,003 million and ~~W~~39,039 million respectively, as expense for the three-month periods ended March 31, 2025 and 2024. The Group also applies the leases of low-value assets recognition exemption to leases contracts with underlying assets considered to be low value (i.e., approximately less than ~~W~~5 million), and recognized ~~W~~836 million and ~~W~~823 million respectively, as expense for the three-month periods ended March 31, 2025 and 2024. The Group has lease contracts for various items such as consecutive voyage charter contracts, power purchase agreements (PPA), real estate lease contracts including buildings, switchyard, and land for electric substation, vehicles, and other equipment.

(2) Right-of-use assets as of March 31, 2025 and December 31, 2024 are as follows:
In millions of won As of March 31, 2025
--- --- --- --- --- --- --- ---
AcquisitionCost Accumulated<br>depreciation Book<br>value
Land ~~W~~ 1,019,657 (356,018 ) 663,639
Buildings 217,716 (113,217 ) 104,499
Structures 54,828 (13,041 ) 41,787
Machinery 55,284 (29,232 ) 26,052
Ships 3,924,127 (2,069,751 ) 1,854,376
Vehicles 65,540 (39,843 ) 25,697
Others (*) 691,930 (450,106 ) 241,824
~~W~~ 6,029,082 (3,071,208 ) 2,957,874
(*) Including a power purchase agreement (“PPA”) with CGN Yulchon Generation Co., Ltd.<br>
--- ---
In millions of won As of December 31, 2024
--- --- --- --- --- --- --- ---
AcquisitionCost Accumulated<br>depreciation Book<br>value
Land ~~W~~ 1,017,114 (339,512 ) 677,602
Buildings 214,258 (108,417 ) 105,841
Structures 52,983 (12,124 ) 40,859
Machinery 54,654 (27,594 ) 27,060
Ships 3,946,265 (2,015,172 ) 1,931,093
Vehicles 59,402 (38,482 ) 20,920
Others (*) 686,400 (443,379 ) 243,021
~~W~~ 6,031,076 (2,984,680 ) 3,046,396
(*) Including a power purchase agreement (“PPA”) with CGN Yulchon Generation Co., Ltd.<br>
--- ---

97

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

24. Lease, Continued
(3) Changes in right-of-use assets for the three-month period ended March 31, 2025 and for the year endedDecember 31, 2024 are as follows:
--- ---
In millions of won For the three-month period ended March 31, 2025
--- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Beginningbalance Increase Depreciation Decrease Others Endingbalance
Land ~~W~~ 677,602 1,401 (15,967 ) 603 663,639
Buildings 105,841 7,860 (10,432 ) (628 ) 1,858 104,499
Structures 40,859 1,889 (2,560 ) 1,599 41,787
Machinery 27,060 106 (1,646 ) (19 ) 551 26,052
Ships 1,931,093 9,688 (86,405 ) 1,854,376
Vehicles 20,920 7,772 (3,522 ) (80 ) 607 25,697
Others 243,021 1,977 (6,479 ) 3,305 241,824
~~W~~ 3,046,396 30,693 (127,011 ) (727 ) 8,523 2,957,874
In millions of won For the year ended December 31, 2024
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Beginningbalance Increase Depreciation Decrease Others Ending<br>balance
Land ~~W~~ 655,860 12,369 (65,245 ) (117 ) 74,735 677,602
Buildings 90,573 61,397 (48,371 ) (399 ) 2,641 105,841
Structures 37,356 4,115 (4,595 ) 3,983 40,859
Machinery 5,943 26,200 (7,083 ) 2,000 27,060
Ships 2,313,305 (363,032 ) (1,656 ) (17,524 ) 1,931,093
Vehicles 25,491 11,042 (14,167 ) (77 ) (1,369 ) 20,920
Others 235,215 17,372 (36,502 ) (3 ) 26,939 243,021
~~W~~ 3,363,743 132,495 (538,995 ) (2,252 ) 91,405 3,046,396

98

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

24. Lease, Continued
(4) Lease liabilities as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- --- --- ---
Less than 1 year ~~W~~ 620,649 632,878
1 ~ 5 years 1,757,872 1,817,340
More than 5 years 1,587,320 1,670,416
3,965,841 4,120,634
Less: present value discounts and others (413,447 ) (421,178 )
Present value of lease payment ~~W~~ 3,552,394 3,699,456
(5) Details of the liquidity classification of lease liabilities as of March 31, 2025 and December 31,2024 are as follows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- ---
Current lease liabilities ~~W~~ 585,461 603,492
Non-current lease liabilities 2,966,933 3,095,964
~~W~~ 3,552,394 3,699,456
(6) Changes in lease liabilities for the three-month period ended March 31, 2025 and for the year endedDecember 31, 2024 are as follows:
--- ---
In millions of won For the three-month period ended March 31, 2025
--- --- --- --- --- --- --- --- --- --- --- --- --- ---
Beginning<br>balance Increase Decrease Interest<br>expenses Others (*) Ending<br>balance
Lease liabilities ~~W~~ 3,699,456 26,324 (209,453 ) 20,821 15,246 3,552,394
(*) Others include the translation effect of foreign currency lease liabilities and others.
--- ---
In millions of won For the year ended December 31, 2024
--- --- --- --- --- --- --- --- --- --- --- --- --- ---
Beginningbalance Increase Decrease Interestexpenses Others (*) Endingbalance
Lease liabilities ~~W~~ 3,807,880 119,161 (695,466 ) 82,638 385,243 3,699,456
(*) Others include the translation effect of foreign currency lease liabilities and others.
--- ---

99

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

24. Lease, Continued
(7) Details of expense relating to lease contracts as lessee for the three-month periods ended March 31,2025 and 2024 are as follows:
--- ---
In millions of won For thethree-monthperiod endedMarch 31, 2025 For thethree-monthperiod endedMarch 31, 2024
--- --- --- --- --- ---
Depreciation of right-of-use assets ~~W~~ 127,011 138,160
Interest expenses of lease liabilities 20,821 20,925
Lease expenses for short-term leases 21,003 39,039
Lease expenses for leases of low-value assets 836 823
Variable lease payments 3,710 (3,700 )
~~W~~ 173,381 195,247
(8) The total cash outflow related to the lease contracts, including cash outflows due to short-term leases<br>and leases of low-value asset, amounts to ~~W~~235,002 million and ~~W~~242,044 million, for the three-month periods ended March 31, 2025 and 2024, respectively.
--- ---

100

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

24. Lease, Continued
2) Group as a lessor
--- ---
(1) Finance lease contracts
--- ---

The Group entered into power purchase agreements (“PPA”) with Jordan Electric Power Company to provide a 373MW level Qatrana gas combined power plant over a 25-year lease term, and an 89.1MW level Fujeij wind power plant over a 20-year lease term. In addition, the Group provides 19 energy storage system installation projects and 163 energy efficiency contracts as finance leases with a lease term of 2 to 11 years. Also, the Group entered into a PPA with the Comision Federal de Electricidad in Mexico to provide for 25 years (from December 2013 to November 2038) all electricity generated from the power plant after completion of its construction and collect rates consisting of fixed costs (to recover the capital) and variable costs during the contracted period.

(2) Profits and losses related to finance leases for the three-month periods ended March 31, 2025 and 2024are as follows:
In millions of won For the three-monthperiod endedMarch 31, 2025 For the three-monthperiod ended<br>March 31, 2024
--- --- --- --- ---
Finance income on the net investment in the lease ~~W~~ 29,829 28,862
(3) The maturity analysis of the lease payments receivable and reconciliation of the undiscounted lease paymentsto the net investment in the lease as of March 31, 2025 and December 31, 2024 is as follows:
--- ---
In millions of won As ofMarch 31, 2025 As ofDecember 31, 2024
--- --- --- --- --- --- ---
Less than 1 year ~~W~~ 214,325 213,300
1 ~ 2 years 204,891 217,747
2 ~ 3 years 200,655 204,867
3 ~ 4 years 190,563 193,379
4 ~ 5 years 181,708 184,436
More than 5 years 1,374,099 1,420,807
2,366,241 2,434,536
Less: unearned finance income (1,031,998 ) (1,078,138 )
Net investment in the lease (*) ~~W~~ 1,334,243 1,356,398
(*) Including the present value of unguaranteed residual value amounting to ~~W~~32,510 million and<br>~~W~~31,857 million, as of March 31, 2025 and December 31, 2024, respectively.
--- ---

The implicit interest rate for a lease term is determined on the lease contract date. The implicit interest rate of the finance lease contracts is from 0.00% up to 17.10% per year as of March 31, 2025 (0.00%~17.15% as of December 31, 2024).

101

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

24. Lease, Continued
(4) Changes in the allowance for doubtful accounts of finance lease receivables for the three-month period endedMarch 31, 2025 and for the year ended December 31, 2024 are as follows:
--- ---
In millions of won For the three-monthperiod endedMarch 31, 2025 For the year endedDecember 31, 2024
--- --- --- --- --- --- ---
Beginning balance ~~W~~ 5,255 5,256
Bad debt expense 2,079
Write-off (230 )
Reversal (1 )
Ending balance ~~W~~ 7,104 5,255

102

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

25. Employment Benefits
(1) Employment benefit obligations as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- ---
Net defined benefit asset ~~W~~ 21,606 40,425
Net defined benefit obligations 1,599,122 1,449,837
Other long-term employee benefit obligations 1,627 1,710
(2) Principal assumptions used for actuarial valuation as of March 31, 2025 and December 31, 2024 areas follows:
--- ---
As of March 31, 2025 As of December 31, 2024
--- --- ---
Discount rate 3.15% ~ 5.06% 3.38%~5.06%
Future salary and benefit levels 4.83% 4.83%
Weighted average duration 9.93 years 9.89 years
(3) Details of expense relating to defined benefit plans for the three-month periods ended March 31, 2025and 2024 are as follows:
--- ---
In millions of won For the three-monthperiod endedMarch 31, 2025 For the three-monthperiod endedMarch 31, 2024
--- --- --- --- --- --- ---
Current service cost ~~W~~ 112,868 102,763
Interest cost 40,947 43,171
Expected return on plan assets (29,331 ) (33,548 )
~~W~~ 124,484 112,386

Expenses described above are recognized in those items below in the consolidated financial statements.

In millions of won For the three-monthperiod endedMarch 31, 2025 For the three-monthperiod endedMarch 31, 2024
Cost of sales ~~W~~ 88,496 79,858
Selling and administrative expenses 23,947 21,518
Others including construction-in-progress 12,041 11,010
~~W~~ 124,484 112,386

In addition, for the three-month periods ended March 31, 2025 and 2024, benefit expenses which the Group paid for the defined contribution plan in accordance with ratio defined in the Group’s retirement benefit plan are classified as follows: ~~W~~22,696 million and ~~W~~20,865 million as cost of sales; ~~W~~4,160 million and ~~W~~3,850 million as selling and administrative expenses; and ~~W~~4,131 million and ~~W~~3,528 million as construction-in-progress and others.

103

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

25. Employment Benefits, Continued
(4) Details of defined benefit obligations as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- --- --- ---
Present value of defined benefit obligation from funded plans ~~W~~ 5,094,689 4,960,645
Fair value of plan assets (3,517,173 ) (3,551,233 )
Net liabilities incurred from defined benefit plans ~~W~~ 1,577,516 1,409,412
(5) Changes in the present value of defined benefit obligations for the three-month period ended March 31,2025 and for the year ended December 31, 2024 are as follows:
--- ---
In millions of won For the three-monthperiodendedMarch 31, 2025 For the year ended<br>December 31, 2024
--- --- --- --- --- --- ---
Beginning balance ~~W~~ 4,960,645 4,312,702
Current service cost 112,868 430,308
Interest cost 40,947 184,169
Remeasurement component 146,425 425,671
Actual payments (166,167 ) (392,336 )
Others (29 ) 131
Ending balance ~~W~~ 5,094,689 4,960,645
(6) Changes in the fair value of plan assets for the three-month period ended March 31, 2025 and for theyear ended December 31, 2024 are as follows:
--- ---
In millions of won For the three-monthperiod endedMarch 31, 2025 For the year ended<br>December 31, 2024
--- --- --- --- --- --- ---
Beginning balance ~~W~~ 3,551,233 3,349,480
Expected return 29,331 141,108
Remeasurement component (458 ) (10,030 )
Contributions by the employers 5 254,763
Actual payments (62,938 ) (184,088 )
Ending balance ~~W~~ 3,517,173 3,551,233

104

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

25. Employment Benefits, Continued
(7) Details of the fair value of plan assets as of March 31, 2025 and December 31, 2024 are asfollows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- ---
Equity instruments ~~W~~ 1,727 2,308
Debt instruments 347,465 413,522
Bank deposits 433,775 452,158
Others (*) 2,734,206 2,683,245
~~W~~ 3,517,173 3,551,233
(*) Others consist of various financial instruments managed by external asset management companies.<br>
--- ---

For the three-month period ended March 31, 2025 and for the year ended December 31, 2024, actual returns on plan assets amounted to ~~W~~28,873 million and ~~W~~131,078 million, respectively.

(8) Remeasurement components recognized in other comprehensive income (loss) for the three-month period endedMarch 31, 2025 and for the year ended December 31, 2024 are as follows:
In millions of won For the three-monthperiod endedMarch 31, 2025 For the year endedDecember 31, 2024
--- --- --- --- ---
Actuarial loss from changes in financial assumptions ~~W~~ 91,084 320,582
Actuarial loss (gain) from experience adjustments, etc. 55,341 105,089
Expected loss (return) 458 10,030
~~W~~ 146,883 435,701

Remeasurement component recognized as other comprehensive income or loss is included in retained earnings.

In addition, loss on accumulated remeasurement component amounting to ~~W~~33,285 million and loss on accumulated remeasurement component amounting to ~~W~~95,694 million have been recognized as other comprehensive income or loss as of March 31, 2025 and December 31, 2024, respectively.

105

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

26. Provisions
(1) Provisions as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
As of March 31, 2025 As of December 31, 2024
--- --- --- --- --- --- --- --- ---
In millions of won Current Non-current Current Non-current
Employment benefits
Provisions for employment benefits ~~W~~ 1,164,207 1,093,625
Litigation
Litigation provisions 9,350 487,189 9,350 479,071
Decommissioning cost
Nuclear plants 79,501 23,328,614 79,501 23,192,872
Spent fuel 824,584 2,099,161 799,384 2,124,361
Radioactive waste 94,748 1,687,418 84,485 1,677,306
PCBs 36,965 39,389
Other recovery provisions 39,406 50,407
Others
Power plant regional support program 178,811 130,256
Transmission regional support program 272,787 302,631
Provisions for financial guarantee 26,293 12,133 26,440 4,484
Provisions for RPS 53,218
Provisions for greenhouse gas emissions obligations 95,505 156,463
Others 339,491 268,972 111,836 269,144
~~W~~ 3,138,495 27,959,858 2,793,971 27,837,034
(2) Changes in provisions for the three-month period ended March 31, 2025 and for the year endedDecember 31, 2024 are as follows:
--- ---
For the three-month period ended March 31, 2025
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
In millions of won Beginningbalance Increase inprovision Payment Reversal Others Ending<br>balance
Employment benefits
Provisions for employment benefits ~~W~~ 1,093,625 346,347 (275,758 ) (7 ) 1,164,207
Litigation
Litigation provisions 488,421 12,366 (1,105 ) (3,143 ) 496,539
Decommissioning cost
Nuclear plants 23,272,373 135,755 (13 ) 23,408,115
Spent fuel 2,923,745 2,923,745
Radioactive waste 1,761,791 20,375 1,782,166
PCBs 39,389 286 (2,710 ) 36,965
Other recovery provisions 50,407 363 (84 ) (11,280 ) 39,406
Others
Power plant regional support program 130,256 59,576 (11,021 ) 178,811
Transmission regional support program 302,631 1,870 (31,714 ) 272,787
Provisions for financial guarantee 30,924 13,573 (4,169 ) (1,873 ) (29 ) 38,426
Provisions for RPS 274,097 (220,879 ) 53,218
Provisions for greenhouse gas emissions obligations 156,463 45 (60,960 ) (43 ) 95,505
Others 380,980 261,436 (33,296 ) (584 ) (73 ) 608,463
~~W~~ 30,631,005 1,126,089 (641,696 ) (5,650 ) (11,395 ) 31,098,353

106

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

26. Provisions, Continued
(2) Changes in provisions for the three-month period ended March 31, 2025 and for the year endedDecember 31, 2024 are as follows, continued:
--- ---
In millions of won For the year ended December 31, 2024
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Beginningbalance Increase inprovision Payment Reversal Others Ending<br>balance
Employment benefits
Provisions for employment benefits ~~W~~ 999,691 1,226,957 (1,127,746 ) (5,379 ) 102 1,093,625
Litigation
Litigation provisions 177,018 373,328 (26,040 ) (35,885 ) 488,421
Decommissioning cost
Nuclear plants 21,646,887 1,692,508 (66,971 ) (51 ) 23,272,373
Spent fuel 2,925,734 842,753 (463,388 ) (381,354 ) 2,923,745
Radioactive waste 1,908,085 113,342 (56,907 ) (202,729 ) 1,761,791
PCBs 57,944 7,049 (25,604 ) 39,389
Other recovery provisions 36,082 4,479 (879 ) 10,725 50,407
Others
Power plant regional support program 130,034 55,761 (55,539 ) 130,256
Transmission regional support program 256,006 202,882 (156,257 ) 302,631
Provisions for financial guarantee 49,992 11,347 (25,723 ) (5,086 ) 394 30,924
Provisions for RPS 36,074 891,143 (862,039 ) (65,178 )
Provisions for greenhouse gas emissions obligations 18,672 164,438 (17,659 ) (5,611 ) (3,377 ) 156,463
Others 292,950 294,954 (126,693 ) (2,441 ) (77,790 ) 380,980
~~W~~ 28,535,169 5,880,941 (3,011,445 ) (703,663 ) (69,997 ) 30,631,005

107

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

27. Government Grants
(1) Government grants as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- ---
Land ~~W~~ 27,402 27,403
Buildings 40,696 41,718
Structures 147,251 149,737
Machinery 103,443 105,546
Vehicles 2,758 2,745
Equipment 3,386 3,915
Tools 1,313 1,306
Construction-in-progress 226,111 223,566
Investment properties 23 22
Software 770 844
Development expenditures 697 939
Intangible assets under development 3,840 3,473
Other intangible assets 206 229
~~W~~ 557,896 561,443

108

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

27. Government Grants, Continued
(2) Changes in government grants for the three-month period ended March 31, 2025 and for the year endedDecember 31, 2024 are as follows:
--- ---
In millions of won For the three-month period ended March 31, 2025
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Beginningbalance Receipt Acquisition Offset theitems of depreciation<br>expense andothers Disposal Revenue Others Endingbalance
Cash ~~W~~ 4,954 47 (5,001 )
Land 27,403 (1 ) 27,402
Buildings 41,718 (1,021 ) (1 ) 40,696
Structures 149,737 (2,370 ) (122 ) 6 147,251
Machinery 105,546 (3,830 ) (24 ) 1,751 103,443
Vehicles 2,745 (359 ) (6 ) 378 2,758
Equipment 3,915 (529 ) 3,386
Tools 1,306 (106 ) 113 1,313
Construction-in-progress 223,566 (1,643 ) 4,188 226,111
Investment properties 22 1 23
Software 844 (74 ) 770
Development expenditures 939 (242 ) 697
Intangible assets under development 3,473 367 3,840
Other intangible assets 229 (23 ) 206
~~W~~ 561,443 4,954 (1,643 ) (8,554 ) (153 ) 47 1,802 557,896
In millions of won For the year ended December 31, 2024
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Beginningbalance Receipt Acquisition Offset theitems ofdepreciationexpense andothers Disposal Revenue Others Endingbalance
Cash ~~W~~ 59,503 4,789 (64,292 )
Land 27,404 (1 ) 27,403
Buildings 46,227 (4,508 ) (1 ) 41,718
Structures 157,881 (9,458 ) (1,330 ) 2,644 149,737
Machinery 119,824 (16,076 ) (522 ) 2,320 105,546
Vehicles 2,837 (1,233 ) (8 ) 1,149 2,745
Equipment 5,932 (2,118 ) 101 3,915
Tools 62 (341 ) 1,585 1,306
Construction-in-progress 173,474 (6,806 ) (75 ) 56,973 223,566
Investment properties 22 (1 ) 1 22
Software 413 (229 ) 660 844
Development expenditures 2,121 (1,364 ) 182 939
Intangible assets under development 2,458 1,015 3,473
Other intangible assets 322 (93 ) 229
~~W~~ 538,977 59,503 (6,806 ) (35,421 ) (1,936 ) 4,789 2,337 561,443

109

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

28. Deferred Revenue

Changes in deferred revenues for the three-month period ended March 31, 2025 and for the year ended December 31, 2024 are asfollows which are included in current and non-current non-financial liabilities in the consolidated statements of financial position:

In millions of won For the three-month period endedMarch 31, 2025 For the year ended<br>December 31, 2024
Beginning balance ~~W~~ 13,652,565 11,548,855
Increase 344,004 2,924,341
Recognized as revenue (211,646 ) (820,631 )
Ending balance ~~W~~ 13,784,923 13,652,565
29. Non-financial Liabilities
--- ---

Non-financial liabilities as of March 31, 2025 and December 31, 2024 are as follows:

In millions of won As of March 31, 2025 As of December 31, 2024
Current Non-current Current Non-current
Advance received ~~W~~ 3,773,244 421,712 3,531,207 354,218
Unearned revenue 43,763 14,157 37,062 14,910
Deferred revenue 786,292 12,998,631 776,988 12,875,577
Withholdings 438,442 2,296 271,425 2,296
Others 1,986,142 34,718 1,710,459 34,519
~~W~~ 7,027,883 13,471,514 6,327,141 13,281,520

110

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

30. Contributed Capital
(1) Details of share capital as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won except share information
--- --- --- --- --- --- --- --- --- --- --- --- ---
As of March 31, 2025
Shares<br>authorized<br>(in shares) Shares issued<br>(in shares) Parvalue<br>per share<br>(in won) Owned bygovernment (*) Owned byothers Total
Common shares 1,200,000,000 641,964,077 ~~W~~ 5,000 1,640,385 1,569,435 3,209,820
(*) Korea Development Bank’s interest of ~~W~~1,056,176 million is included.<br>
--- ---
In millions of won except share information
--- --- --- --- --- --- --- --- --- --- --- --- ---
As of December 31, 2024
Shares<br>authorized<br>(in shares) Shares issued<br>(in shares) Par value<br>per share<br>(in won) Owned bygovernment (*) Owned byothers Total
Common shares 1,200,000,000 641,964,077 ~~W~~ 5,000 1,640,385 1,569,435 3,209,820
(*) Korea Development Bank’s interest of ~~W~~1,056,176 million is included.<br>
--- ---
(2) Details in the number of floating capital stock for the three-month period ended March 31, 2025 and forthe year ended December 31, 2024 are as follows:
--- ---
Number of shares For the three-month periodended March 31, 2025 For the year endedDecember 31, 2024
--- --- --- --- ---
Beginning balance 641,964,077 641,964,077
Ending balance 641,964,077 641,964,077
(3) Details of share premium as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- ---
Share premium ~~W~~ 843,758 843,758

111

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

31. Retained Earnings and Dividends Paid
(1) Details of retained earnings as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- ---
Legal reserve (*) ~~W~~ 1,604,910 1,604,910
Voluntary reserves 567,469
Retained earnings before appropriations 20,052,687 18,523,337
Retained earnings ~~W~~ 22,225,066 20,128,247
(*) The KEPCO Act (Article 14) requires KEPCO to appropriate a legal reserve equal to at least 20 percent of net<br>income for each accounting period until the reserve equals 50 percent of KEPCO’s common stock. The legal reserve is not available for cash dividends; however, this reserve may be credited to paid-in capital or offset against accumulated deficit<br>by the resolution of the shareholders.
--- ---
(2) Details of voluntary reserves as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- ---
Reserve for business expansion ~~W~~ 567,469
~~W~~ 567,469
(3) Changes in retained earnings for the three-month period ended March 31, 2025 and for the year endedDecember 31, 2024 are as follows:
--- ---
In millions of won For the three-month periodended March 31, 2025 For the year ended December 31,2024
--- --- --- --- --- --- ---
Beginning balance ~~W~~ 20,128,247 16,338,262
Profit for the year attributed to owners of<br><br><br>the controlling company 2,328,246 3,491,698
Changes in equity method retained earnings (248 ) (6,346 )
Remeasurements of defined benefit liability, net of tax (94,441 ) (281,761 )
Transfer of revaluation reserve 586,394
Dividend paid (136,738 )
Ending balance ~~W~~ 22,225,066 20,128,247

112

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

31. Retained Earnings and Dividends Paid, Continued
(4) Dividends paid for the three-month period ended March 31, 2025 and for the year ended December 31,2024 are as follows:
--- ---
In millions of won For the three-month period ended March 31, 2025
--- --- --- --- --- --- --- --- --- --- ---
Number of<br>shares issued<br>(in shares) Number of<br>treasury stocks<br>(in shares) Number of<br>shares eligible for<br>dividends (inshares) Dividends paidper share (inwon) Dividends<br>paid
Common shares 641,964,077 641,964,077 ~~W~~ 213 136,738
In millions of won For the year ended December 31,2024
--- --- --- --- --- --- --- --- ---
Number of<br><br><br>shares issued<br> <br>(inshares) Number of<br><br><br>treasury stocks<br> <br>(inshares) Number of<br>shares eligible for<br>dividends (in shares) Dividends paid<br>per share<br>(in won) Dividends<br>paid
Common shares 641,964,077 641,964,077 ~~W~~—
(5) Changes in retained earnings of investments in associates and joint ventures for the three-month periodended March 31, 2025 and for the year ended December 31, 2024 are as follows:
--- ---
In millions of won For the three-month periodended March 31, 2025 For the year ended December<br>31, 2024
--- --- --- --- --- --- ---
Beginning balance ~~W~~ (17,420 ) (11,074 )
Changes (248 ) (6,346 )
Ending balance ~~W~~ (17,668 ) (17,420 )
(6) Changes in remeasurement components related to defined benefit liability for the three-month period endedMarch 31, 2025 and for the year ended December 31, 2024 are as follows:
--- ---
In millions of won For the three-month periodended March 31, 2025 For the year ended December<br>31, 2024
--- --- --- --- --- --- ---
Beginning balance ~~W~~ (95,694 ) 29,229
Changes (141,188 ) (421,327 )
Income tax effect 46,747 139,566
Transfer to reserve for business expansion 156,850 156,838
Ending balance ~~W~~ (33,285 ) (95,694 )

113

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

32. Hybrid Bonds

Hybrid bonds classified as equity (non-controlling interests) as of March 31, 2025 and December 31, 2024 are as follows:

In millions of won
Issuer Hybrid bond Issued date Maturity Yield (%) As of March 31,2025 As of December 31,2024
Korea South-East Power Co., Ltd. (*1, 2) 2nd hybrid bond 2012.12.07 2042.12.06 5.10 ~~W~~ 230,000
Expense of issuance (627 )
~~W~~ 229,373
(*1) Bondholders may not require prepayment in any case, and the Group has a call option to repay all of these bonds<br>on or after 12 years from the date of issuance of the bonds, or on each interest payment date henceforth. In addition, there is a step-up clause from the date of the initial call option exercise. Although these instruments have contractual maturity<br>dates, the contractual agreements allow the Group to indefinitely extend the maturity dates and defer the payment of interest without modification to the other terms of the instruments. When the Group decides not to pay dividends on common shares,<br>they are not required to pay interest on the hybrid bonds. From December 7, 2024, the date when the call option become exercisable for the first time, the interest rate has increased from 4.44% to 5.10% due to the application of the step-up<br>provision.
--- ---
(*2) 2nd hybrid bond was redeemed during the three-month period ended March 31, 2025.
--- ---

114

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

33. Other Components of Equity
(1) Other components of equity as of March 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- ---
Other capital surplus ~~W~~ 1,601,138 1,600,812
Accumulated other comprehensive income 1,368,224 1,424,014
Other equity 12,708,585 12,708,585
~~W~~ 15,677,947 15,733,411
(2) Changes in other capital surplus for the three-month period ended March 31, 2025 and for the year endedDecember 31, 2024 are as follows:
--- ---
For the three-month period ended March 31, 2025 For the year ended December 31, 2024
--- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
In millions of won Gains ondisposal oftreasurystocks Others Subtotal Gains on<br>disposal of<br>treasury<br>stocks Others Subtotal
Beginning balance ~~W~~ 387,524 1,213,288 1,600,812 387,524 1,213,277 1,600,801
Additional paid-in capital of subsidiaries 245 245 (7 ) (7 )
Transactions between consolidated entities 81 81 18 18
Ending balance ~~W~~ 387,524 1,213,614 1,601,138 387,524 1,213,288 1,600,812

115

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

33. Other Components of Equity, Continued
(3) Changes in accumulated other comprehensive income (loss) for the three-month period ended March 31,2025 and for the year ended December 31, 2024 are as follows:
--- ---
In millions of won For the three-month period ended March 31, 2025
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Financial assets at<br>fair value throughother<br>comprehensive<br>income<br>valuation reserve Shares of othercomprehensive<br>income of<br>investments in<br>associates andjoint ventures Reserve<br>for overseasoperations<br>translationcredit Reserve for<br>gain (loss) onvaluation of<br>derivatives Total
Beginning balance ~~W~~ 80,757 1,597,958 (231,946 ) (22,755 ) 1,424,014
Changes in the unrealized fair value of financial assets at FVOCI, net of tax (39,752 ) (39,752 )
Shares of other comprehensive loss of associates and joint ventures, net of tax (52,419 ) (52,419 )
Foreign currency translation of foreign operations, net of tax 25,151 25,151
Net change in the unrealized fair value of derivatives using cash flow hedge accounting, net of<br>tax 11,230 11,230
Ending balance ~~W~~ 41,005 1,545,539 (206,795 ) (11,525 ) 1,368,224
In millions of won For the year ended December 31, 2024
--- --- --- --- --- --- --- --- --- --- --- --- --- ---
Financial assets at<br>fair value through<br>other<br>comprehensive<br>income<br>valuation reserve Shares ofothercomprehensive<br>income of<br>investments in<br>associates andjoint ventures Reservefor overseasoperations<br>translation<br>credit Reserve for<br>gain (loss) onvaluation of<br>derivatives Total
Beginning balance ~~W~~ (20,002 ) 943,733 (331,570 ) (34,731 ) 557,430
Changes in the unrealized fair value of financial assets at FVOCI, net of tax 100,759 100,759
Shares of other comprehensive income of associates and joint ventures, net of tax 654,225 654,225
Foreign currency translation of foreign operations, net of tax 99,624 99,624
Net change in the unrealized fair value of derivatives using cash flow hedge accounting, net of<br>tax 11,976 11,976
Ending balance ~~W~~ 80,757 1,597,958 (231,946 ) (22,755 ) 1,424,014
(4) Other equity as of March 31, 2025 and December 31, 2024 is as follows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- --- --- ---
Statutory revaluation reserve ~~W~~ 12,708,704 12,708,704
Changes in other equity (119 ) (119 )
~~W~~ 12,708,585 12,708,585

116

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

34. Sales

Details of sales for the three-month periods ended March 31, 2025 and 2024 are as follows:

In millions of won For the three-month period ended March 31, 2025 For the three-month period ended March 31, 2024
Domestic Overseas Total Domestic Overseas Total
[Type of goods and services]
Sales of goods ~~W~~ 23,699,567 109,882 23,809,449 22,775,171 75,577 22,850,748
Electricity 23,211,200 23,211,200 22,164,993 22,164,993
Heat supply 186,688 186,688 193,258 193,258
Others 301,679 109,882 411,561 416,920 75,577 492,497
Sales related to rendering of services 86,590 60,102 146,692 100,149 67,551 167,700
Sales related to construction services 19,256 36,941 56,197 24,687 60,819 85,506
Revenue related to transfer of assets from customers 211,646 211,646 188,789 188,789
~~W~~ 24,017,059 206,925 24,223,984 23,088,796 203,947 23,292,743
[Timing of revenue recognition]
Performance obligations satisfied at a point in time ~~W~~ 23,699,567 109,882 23,809,449 22,775,171 75,577 22,850,748
Performance obligations satisfied over time 317,492 97,043 414,535 313,625 128,370 441,995
~~W~~ 24,017,059 206,925 24,223,984 23,088,796 203,947 23,292,743

117

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

35. Selling and Administrative Expenses

Selling and administrative expenses for the three-month periods ended March 31, 2025 and 2024 are as follows:

In millions of won For the three-month periodended March 31, 2025 For the three-month periodended March 31, 2024
Salaries ~~W~~ 285,729 281,032
Retirement benefit expense 28,107 25,368
Welfare and benefit expense 32,824 31,546
Insurance expense 7,716 7,345
Depreciation 57,511 57,322
Amortization of intangible assets 22,318 21,875
Bad debt expense 17,373 10,175
Commission 106,007 105,200
Advertising expense 10,484 10,564
Training expense 1,986 2,073
Vehicle maintenance expense 2,038 1,973
Publishing expense 711 726
Business development expense 708 681
Rent expense 11,772 11,313
Telecommunication expense 2,838 2,567
Transportation expense 245 236
Taxes and dues 10,151 9,434
Expendable supplies expense 1,852 1,685
Water, light and heating expense 4,625 4,162
Repairs and maintenance expense 29,061 37,481
Ordinary development expense 43,600 38,140
Travel expense 4,907 4,486
Clothing expense 546 348
Survey and analysis expense 186 198
Membership fee 633 655
Others 29,505 23,628
~~W~~ 713,433 690,213

118

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

36. Other Income and Expenses
(1) Other income for the three-month periods ended March 31, 2025 and 2024 are as follows:
--- ---
In millions of won For the three-month periodended March 31, 2025 For the three-month periodended March 31, 2024
--- --- --- --- ---
Reversal of other provisions ~~W~~ 3,113 21,812
Reversal of other allowance for bad debt 6,500
Gains on government grants 47
Gains on assets contributed 181 882
Gains on liabilities exempted 280 155
Compensation and reparations revenue 20,207 20,690
Revenue from foundation fund 154
Rental income 52,849 56,643
Others 9,476 25,212
~~W~~ 92,807 125,394
(2) Other expenses for the three-month periods ended March 31, 2025 and 2024 are as follows:
--- ---
In millions of won For the three-month periodended March 31, 2025 For the three-month periodended March 31, 2024
--- --- --- --- ---
Compensation and indemnification expense ~~W~~ 1 83
Accretion expenses of other provisions 440 114
Depreciation expenses on investment properties 195 159
Depreciation expenses on idle assets 904 910
Other bad debt expense 2 2,546
Donations 12,111 91,293
Others 6,225 7,411
~~W~~ 19,878 102,516

119

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

37. Other Gains (Losses)

Composition of other gains (losses) for the three-month periods ended March 31, 2025 and 2024 is as follows:

In millions of won For the three-month periodended March 31, 2025 For the three-month periodended March 31, 2024
Other gains
Gains on disposal of property, plant and equipment ~~W~~ 5,363 34,053
Gains on disposal of intangible assets 11
Gains on foreign currency translation 4,162 12,931
Gains on foreign currency transactions 44,613 17,088
Others 172,464 71,021
Other losses
Losses on disposal of property, plant and equipment (37,158 ) (17,983 )
Losses on disposal of intangible assets (13 ) (110 )
Losses on foreign currency translation (10,082 ) (8,605 )
Losses on foreign currency transactions (19,688 ) (42,843 )
Others (61,089 ) (40,499 )
~~W~~ 98,572 25,064

120

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

38. Finance Income

Finance income for the three-month periods ended March 31, 2025 and 2024 is as follows:

In millions of won For the three-monthperiod ended March31, 2025 For the three-monthperiod ended March31, 2024
Interest income ~~W~~ 111,988 118,441
Dividends income 13,551 78
Gains on disposal of financial assets 10,564 8,108
Gains on valuation of financial assets at fair value through profit or loss 14,609 36,671
Gains on valuation of derivatives 80,809 705,362
Gains on transaction of derivatives 79,130 47,902
Gains on foreign currency translation 61,897 61,601
Gains on foreign currency transactions 39,923 8,352
Others 830 711
~~W~~ 413,301 987,226

121

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

39. Finance Expenses

Finance expenses for the three-month periods ended March 31, 2025 and 2024 are as follows:

In millions of won For the three-month periodended March 31, 2025 For the three-month periodended March 31, 2024
Interest expense ~~W~~ 1,117,124 1,151,729
Losses on sale of financial assets 735 27
Losses on valuation of financial assets at fair value through profit or loss 215 238
Losses on valuation of derivatives 43,801 28,982
Losses on transaction of derivatives 34,449 13,600
Losses on foreign currency translation 29,490 799,035
Losses on foreign currency transactions 2,515 2,577
Others 3,326 5,065
~~W~~ 1,231,655 2,001,253

Capitalization rates for each of the three-month periods ended March 31, 2025 and 2024 are 2.33%~3.26% and 2.44%~4.58%, respectively.

122

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

40. Income Taxes
(1) Income tax expense is calculated by adjusting prior year adjustments, changes in deferred tax assets and<br>liabilities resulting from temporary differences, and income tax expense related to items recognized as other than profit or loss. The average effective tax rate for the three-month periods ended March 31, 2025 and 2024 is 26.92% and 19.23%,<br>respectively.
--- ---
(2) Pillar Two Model Rules
--- ---

The Group has assessed the potential exposure arising from the Pillar Two legislation based on the financial information. Based on the assessment carried out so far, the Group has identified its potential exposure to Pillar Two income taxes on profits earned from its constituent entities operating in Nepal, Pakistan, Vietnam, and other jurisdictions where the expected Pillar Two effective tax rate is likely to be lower than 15%. As a result, the Group expects that KEPCO and its constituent entities operating therein will pay additional Pillar Two income taxes on the profit from such constituent entities.

The current income tax expense recognized for the three-month period ended March 31, 2025 in relation with the additional Pillar Two income taxes amounts to approximately ~~W~~733 million. The Group has applied the mandatory exception to recognition and disclosure of deferred taxes arising from Pillar Two income taxes.

123

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

41. Assets Held-for-Sale

Assets held-for-sale as of March 31, 2025 and December 31, 2024 are as follows:

In millions of won As of March 31, 2025 As of December 31, 2024
Land (*) ~~W~~ 28,859 31,766
Buildings (*) 9 13,881
Structures 1
~~W~~ 28,868 45,648
(*) The board of directors of Korea Electric Power Corporation, the controlling company, made a resolution to sell<br>the Uijeongbu substation, and reclassified the buildings and land as assets held-for-sale expecting its carrying amount would be recovered through a sale transaction during the year ended December 31, 2022. Although it is expected to take<br>more than a year to complete the sale transaction, the Group decided that the definitive purchase contract is still valid as a result of discussions with the counterparty.
--- ---

124

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

42. Expenses Classified by Nature

Expenses classified by nature for the three-month periods ended March 31, 2025 and2024 are as follows:

In millions of won For the three-month period ended March 31, 2025
Selling andadministrative expenses Cost of sales Total
Raw materials used ~~W~~ 4,702,200 4,702,200
Power purchase 8,756,833 8,756,833
Salaries 285,729 1,118,182 1,403,911
Retirement benefit expense 28,107 111,192 139,299
Welfare and benefit expense 32,824 127,975 160,799
Insurance expense 7,716 33,654 41,370
Depreciation 57,511 3,434,552 3,492,063
Amortization of intangible assets 22,318 17,981 40,299
Bad debt expense 17,373 17,373
Commission 106,007 69,294 175,301
Advertising expense 10,484 1,544 12,028
Training expense 1,986 3,263 5,249
Vehicle maintenance expense 2,038 2,059 4,097
Publishing expense 711 573 1,284
Business promotion expense 708 621 1,329
Rent expense 11,772 28,338 40,110
Telecommunication expense 2,838 2,477 5,315
Transportation expense 245 20,350 20,595
Taxes and dues 10,151 111,387 121,538
Expendable supplies expense 1,852 9,359 11,211
Water, light and heating expense 4,625 8,624 13,249
Repairs and maintenance expense 29,061 527,881 556,942
Ordinary development expense 43,600 132,355 175,955
Travel expense 4,907 17,423 22,330
Clothing expense 546 541 1,087
Survey and analysis expense 186 877 1,063
Membership fee 633 5,736 6,369
Others 29,505 511,673 541,178
~~W~~ 713,433 19,756,944 20,470,377

125

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

42. Expenses Classified by Nature, Continued

Expenses classified by nature for the three-month periods ended March 31, 2025 and2024 are as follows, continued:

In millions of won For the three-month period ended March 31, 2024
Selling andadministrative expenses Cost of sales Total
Raw materials used ~~W~~ 5,781,061 5,781,061
Power purchase 9,202,880 9,202,880
Salaries 281,032 1,121,775 1,402,807
Retirement benefit expense 25,368 100,723 126,091
Welfare and benefit expense 31,546 127,841 159,387
Insurance expense 7,345 36,508 43,853
Depreciation 57,322 3,453,904 3,511,226
Amortization of intangible assets 21,875 18,629 40,504
Bad debt expense 10,175 10,175
Commission 105,200 101,207 206,407
Advertising expense 10,564 1,424 11,988
Training expense 2,073 2,769 4,842
Vehicle maintenance expense 1,973 2,092 4,065
Publishing expense 726 656 1,382
Business promotion expense 681 640 1,321
Rent expense 11,313 30,907 42,220
Telecommunication expense 2,567 2,288 4,855
Transportation expense 236 15,993 16,229
Taxes and dues 9,434 109,067 118,501
Expendable supplies expense 1,685 10,405 12,090
Water, light and heating expense 4,162 9,577 13,739
Repairs and maintenance expense 37,481 696,284 733,765
Ordinary development expense 38,140 128,168 166,308
Travel expense 4,486 19,535 24,021
Clothing expense 348 683 1,031
Survey and analysis expense 198 879 1,077
Membership fee 655 4,802 5,457
Others 23,628 322,490 346,118
~~W~~ 690,213 21,303,187 21,993,400

126

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

43. Earnings Per Share
(1) Basic earnings per share for the three-month periods ended March 31, 2025 and 2024 are as follows:
--- ---
In won For the three-month periodended March 31, 2025 For the three-month periodended March 31, 2024
--- --- --- --- ---
Type
Basic earnings per share ~~W~~ 3,627 875
(2) Profits for the periods and the weighted average number of common shares used in the calculation of basicearnings per share for the three-month periods ended March 31, 2025 and 2024 are as follows:
--- ---
In millions of won except number of shares For the three-monthperiod ended March31, 2025 For the three-monthperiod ended March31, 2024
--- --- --- --- ---
Type
Profit attributable to controlling interest ~~W~~ 2,328,246 561,462
Profit used in the calculation of total basic earnings per share 2,328,246 561,462
Weighted average number of common shares (in shares) 641,964,077 641,964,077
(3) The weighted average number of common shares used in the calculation of basic earnings per share for thethree-month periods ended March 31, 2025 and 2024 is as follows:
--- ---
In number of shares<br><br><br>Type For the three-monthperiod ended March31, 2025 For the three-monthperiod ended March31, 2024
--- --- --- --- ---
The number of common shares issued at beginning of the year 641,964,077 641,964,077
Weighted average number of common shares (in shares) 641,964,077 641,964,077
(4) There are no potential dilutive instruments, thus diluted earnings per share are same as basic earnings pershare for the three-month periods ended March 31, 2025 and 2024.
--- ---

127

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

44. Risk Management

The Group manages various risks that may arise from each business segment, primarily focusing on credit risk, market risk, interest rate risk, and liquidity risk. These risks are identified, measured, controlled, and reported in accordance with the Group’s established basic policy for risk management.

(1) Capital risk management

The Group manages its capital to ensure the ability to continue as a going concern while minimizing the cost of capital and maximizing returns to shareholders. The management of the Group periodically reviews the capital structure and maintains an optimal capital mix through short- and long-term borrowings and equity issuances. The capital structure consists of net debt (calculated as borrowings less cash and cash equivalents) and equity. The Group’s overall capital risk management policy remains consistent with the prior year.

Details of the Group’s capital management accounts as of March 31, 2025 and December 31, 2024 are as follows:

In millions of won As of March 31, 2025 As of December 31, 2024
Total borrowings and debt securities ~~W~~ 133,234,949 132,533,400
Cash and cash equivalents 2,442,980 2,382,979
Net borrowings and debt securities 130,791,969 130,150,421
Total equity 43,111,122 41,362,833
Debt to equity ratio 303.38 % 314.66 %
(2) Financial risk management
--- ---

The Group is exposed to various risks related to its financial instruments, such as, market risk (currency risk, interest rate risk, price risk), and credit risk. The Group monitors and manages the financial risks relating to the operations of the Group through internal risk reports which analyze exposures by degree and magnitude of risks. The Group uses derivative financial instruments to hedge certain risk exposures. The Group’s overall financial risk management strategy remains consistent with the prior year.

(i) Credit risk

Credit risk is the risk of finance loss to the Group if a customer or counterparty to a financial instrument fails to meet its contractual obligations, and arises primarily from the sales activities, securities and derivatives. In addition, credit risk exposure may exist within financial guarantees and unused line of credits. As these financial institutions the Group makes transactions with are reputable financial institutions, the credit risk from them is considered limited. The Group decides credit transaction limits based on evaluation of client’s credit, through information obtained from the credit bureau and disclosed financial position at committing contracts.

Credit risk management

Electricity sales, the main operations of the Group are the necessity for daily life and industrial activities of Korean nationals and have importance as one of the national key industries. The Group dominates the domestic market supplying electricity to customers. The Group is not exposed to significant credit risk as customers of the Group are diverse and are from various industries and areas. The Group uses publicly available information and its own internal data related to trade receivables, to rate its major customers and to measure the credit risk that a counter party will default on a contractual obligation. For the incurred but not recognized loss, it is measured considering overdue period.

Impairment and allowance account

In accordance with the Group policies, individual material financial assets are assessed on a regular basis. Trade receivables that are assessed not to be impaired individually are, in addition, assessed for impairment on a collective basis. Value of the acquired collateral (including the confirmation of feasibility) and estimated collectable amounts are included in this assessment.

Allowance for bad debts assessed on a collective basis are recognized for (i) the group of assets which individually are not material and (ii) incurred but not recognized losses that are assessed using statistical methods, judgment and past experience.

128

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

44. Risk Management, Continued
(2) Financial risk management, continued
--- ---

Book values of the financial assets represent the maximum exposed amounts of the credit risk. Details of the Group’s level of maximum exposure to credit risk as of March 31, 2025 and December 31, 2024 are as follows:

In millions of won As of March 31,2025 As ofDecember 31,2024
Cash and cash equivalents ~~W~~ 2,442,980 2,382,979
Financial assets at fair value through profit or loss (*1) 2,872,890 2,013,948
Derivative assets (trading) 1,880,180 1,846,527
Financial assets at fair value through other comprehensive income (debt securities) 5,045 5,045
Financial assets at amortized cost 60,373 30,233
Loans 921,438 908,148
Long-term/short-term financial instruments 2,526,503 1,960,140
Derivative assets (applying hedge accounting) 771,644 844,637
Trade and other receivables 14,368,320 15,373,625
Financial guarantee contracts (*2) 3,960,295 5,151,554
~~W~~ 29,809,668 30,516,836
(*1) Equity investments held by the Group are excluded.
--- ---
(*2) Maximum exposure associated with the financial guarantee contracts is the maximum amounts of the obligation.<br>
--- ---

For the three-month period ended March 31, 2025, there are no financial assets and non-financial assets that were acquired through the exercise of the right of collateralized assets and reinforcement of credit arrangement.

(ii) Market risk

Market risk is the risk that the Group’s fair values of the financial instruments or future cash flows are affected by the changes in the market. Market risk consists of interest rate risk, currency risk and other price risk.

129

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

44. Risk Management, Continued
(2) Financial risk management, continued
--- ---
(iii) Sensitivity analysis
--- ---

Significant assets and liabilities with uncertainties in underlying assumptions.

Defined benefit obligation

A sensitivity analysis of defined benefit obligation assuming a 1%p increase and decrease in the actuarial valuation assumptions as of March 31, 2025 and December 31, 2024 is as follows:

As of March 31, 2025 As of December 31, 2024
In millions of won<br><br><br>Type Accounts 1%pIncrease 1%p<br>Decrease 1%p<br>Increase 1%p<br>Decrease
Future salary increases Increase (decrease) in defined benefit obligation ~~W~~ 499,520 (436,014 ) 473,627 (413,799 )
Discount rate Increase (decrease) in defined benefit obligation (442,553 ) 521,329 (429,517 ) 506,031

Changes in retirement benefit costs assuming a 1%p increase and decrease in discount rate on plan asset for the three-month periods ended March 31, 2025 and 2024 are ~~W~~8,283 million and ~~W~~7,874 million, respectively.

Provisions

Changes in provisions due to underlying assumptions as of March 31, 2025 and December 31, 2024 are as follows:

Type Accounts As of March 31, 2025 As of December 31, 2024
PCBs Inflation rate 2.80 % 2.80 %
Discount rate 2.90 % 2.90 %
Nuclear plants Inflation rate 2.02 % 2.02 %
Discount rate 2.78 % 2.78 %
Spent fuel Inflation rate 1.91 % 1.91 %
Discount rate 2.49 % 2.49 %
Radioactive waste Inflation rate 3.32 % 3.32 %
Discount rate 4.17 % 4.17 %

A sensitivity analysis of provisions assuming a 0.1%p increase and decrease in the underlying assumptions as of March 31, 2025 and December 31, 2024 is as follows:

As of March 31, 2025 As of December 31, 2024
In millions of won<br><br><br>Type Accounts 0.1%pIncrease 0.1%p<br>Decrease 0.1%p<br>Increase 0.1%p<br>Decrease
Discount rate PCBs ~~W~~ (48 ) 48 (58 ) 58
Nuclear plants (462,708 ) 479,762 (464,727 ) 481,899
Spent fuel (129,983 ) 130,679 (129,983 ) 130,679
Radioactive waste (11,156 ) 11,267 (11,363 ) 11,478
Inflation rate PCBs 48 (48 ) 58 (58 )
Nuclear plants 511,300 (493,753 ) 507,814 (490,386 )
Spent fuel 133,847 (128,527 ) 133,847 (128,527 )
Radioactive waste 11,358 (11,264 ) 11,167 (11,075 )

130

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

44. Risk Management, Continued
(2) Financial risk management, continued
--- ---

Management judgment effected by uncertainties in underlying assumptions.

Foreign currency risk

The Group undertakes transactions denominated in foreign currencies; consequently, exposures to exchange rate fluctuations arise. The carrying amounts of the Group’s foreign currency denominated monetary assets and monetary liabilities as of March 31, 2025 and December 31, 2024 are as follows:

In thousands of foreign currencies Liabilities
Type As of December 31, 2024 As of March 31, 2025 As of December 31, 2024
AED 37,715 33,465 4,452 8,795
AUD 29 26 64
BDT 2,252 2,252
BWP 768 768
CAD 2 2 1,300 61
CHF 100,231 100,686
DOP 3,196 7,772
EGP 150,966 203,044
4,921 20,433 42,853 47,829
85 139 4
HKD 6,292,898 5,093,862
IDR 40,955,546 37,830,902 2,030,640 4,027,099
997,802 1,037,437 169,345 225,042
JOD 1,243 902 121 49,128
186,955 23,798 522,880 7,483,199
KZT 1,510 1,510 14
MGA 7,378,732 5,452,745 427,164 248,175
MMK 188,021 188,021 6,022,352
MYR 2,805 2,805
PHP 22,917 19,401
PKR 60,216,827 68,734,242 10,418 10,418
SAR 1,122 1,087
SEK 449,794 449,302
SGD 598 291 110
1,178,257 1,651,765 8,526,793 15,364,685
UYU 127,632 99,189 1,599 1,141
VND 652,427 733,338 587,003
ZAR 80,982 79,897

All values are in Euros.

A sensitivity analysis on the Group’s income for the period assuming a 10% increase and decrease in currency exchange rates as of March 31, 2025 and December 31, 2024 is as follows:

In millions of won As of March 31, 2025 As of December 31, 2024
Type 10% Increase 10% Decrease 10% Increase 10% Decrease
Increase (decrease) of profit before income tax ~~W~~ (1,189,643 ) 1,189,643 (2,114,808 ) 2,114,808
Increase (decrease) of shareholder’s equity (*) (1,189,643 ) 1,189,643 (2,114,808 ) 2,114,808
(*) The effect on the shareholder’s equity excluding the impact of income taxes.
--- ---

The sensitivity analysis above is conducted for monetary assets and liabilities denominated in foreign currencies other than functional currency, without consideration of hedge effect of related derivatives, as of March 31, 2025 and December 31, 2024.

131

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

44. Risk Management, Continued
(2) Financial risk management, continued
--- ---

To manage its foreign currency risk related to foreign currency denominated receivables and payables, the Group has a policy to enter into currency swap agreements. In addition, to manage its foreign currency risk related to foreign currency denominated expected sales transactions and purchase transactions, the Group enters into currency forward agreements.

There is an economic relationship between the hedged item and the hedging instrument as the terms of cross-currency swap agreement is consistent with the terms of expected transaction (repayment of foreign debt securities and others). The hedging ratio is 1:1 as the risk of cross-currency swap agreement matches the hedged item. As of March 31, 2025, the hedging instrument (cross-currency swap) hedges the risk of the hedged item (repayment of foreign debt securities and others).

Interest rate risk

The Group is exposed to interest rate risk due to its borrowing with floating interest rates. A 1%p increase or decrease is used when reporting interest rate risk internally to key management personnel and represents management’s assessment of the reasonably possible change in interest rates.

The Group’s borrowings and debt securities with floating interest rates as of March 31, 2025 and December 31, 2024 are as follows:

In millions of won
Type As of March 31, 2025 As of December 31, 2024
Short-term borrowings ~~W~~ 4,021,481 4,069,444
Long-term borrowings 10,557,426 10,112,707
Debt securities 41,578 41,578
~~W~~ 14,620,485 14,223,729

A sensitivity analysis on the Group’s borrowings and debt securities assuming a 1%p increase and decrease in interest rates for the three-month period ended March 31, 2025 and for the year ended December 31, 2024 is as follows:

In millions of won For the three-month period ended<br>March 31, 2025 For the year ended<br>December 31, 2024
Type 1%p Increase 1%p Decrease 1%p Increase 1%p Decrease
Increase (decrease) of profit before income tax ~~W~~ (36,551 ) 36,551 (142,237 ) 142,237
Increase (decrease) of shareholder’s equity (*) (36,551 ) 36,551 (142,237 ) 142,237
(*) The effect on the shareholder’s equity excluding the impact of income taxes.
--- ---

The Group manages its interest rate risk by having a balanced portfolio of fixed and variable rate loans and borrowings. To manage this, the Group enters into interest rate swaps, in which it agrees to exchange, at specified intervals, the difference between fixed and variable rate interest amounts calculated by reference to an agreed-upon notional principal amount. The above analysis measures the interest rate risk before reflecting the hedge effect by related derivatives.

132

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

44. Risk Management, Continued
(2) Financial risk management, continued
--- ---
Electricity rates risk
--- ---

The Group is exposed to electricity rates risk due to changes in government regulations and policies on national power supply schemes and electricity billing rates, in consideration of the national economy.

A sensitivity analysis on the Group’s income for the period assuming a 1% increase and decrease in price of electricity for the three-month periods ended March 31, 2025 and 2024 is as follows:

In millions of won For the three-month period endedMarch 31, 2025 For the three-month period endedMarch 31, 2024
Type 1% Increase 1% Decrease 1% Increase 1% Decrease
Increase (decrease) of profit before income tax ~~W~~ 232,112 (232,112 ) 221,650 (221,650 )
Increase (decrease) of shareholder’s equity (*) 232,112 (232,112 ) 221,650 (221,650 )
(*) The effect on the shareholder’s equity excluding the impact of income taxes.
--- ---
(iv) Liquidity risk
--- ---

The Group has established an appropriate liquidity risk management framework for the management of the Group’s short, medium and long-term funding and liquidity management requirements. The Group manages liquidity risk by continuously monitoring forecasted and actual cash flows, and by matching the maturity profiles of financial assets and liabilities.

In addition, the Group has established credit lines on its trade financing and bank overdrafts, and through payment guarantees it has received, it maintains an adequate credit (borrowing) line. In addition, the Group has the ability to utilize excess cash or long-term borrowings for major construction investments.

The expected maturities of non-derivative financial liabilities as of March 31, 2025 and December 31, 2024 in detail are as follows:

As of March 31, 2025
In millions of won<br><br><br>Type Less than<br>1 year 1~2 Years 2~5 Years More than<br>5 years Total
Borrowings ~~W~~ 18,953,486 1,152,929 1,365,933 1,131,895 22,604,243
Debt securities 27,900,360 29,295,605 35,768,132 32,604,308 125,568,405
Lease liabilities 620,649 569,329 1,188,543 1,587,320 3,965,841
Trade and other payables (*1) 7,941,350 357,218 652,073 524,560 9,475,201
Financial guarantee contracts (*2) 3,046,800 526,559 252,017 134,919 3,960,295
~~W~~ 58,462,645 31,901,640 39,226,698 35,983,002 165,573,985
As of December 31, 2024
--- --- --- --- --- --- --- --- --- --- ---
In millions of won<br><br><br>Type Less than<br>1 year 1~2 Years 2~5 Years More than<br>5 years Total
Borrowings ~~W~~ 18,887,527 430,883 1,300,087 2,032,303 22,650,800
Debt securities 28,967,125 29,601,867 39,451,207 28,885,833 126,906,032
Lease liabilities 632,878 553,030 1,264,310 1,670,416 4,120,634
Trade and other payables (*1) 8,807,823 354,778 631,653 526,846 10,321,100
Financial guarantee contracts (*2) 3,156,187 1,712,801 270,806 11,760 5,151,554
~~W~~ 60,451,540 32,653,359 42,918,063 33,127,158 169,150,120
(*1) Excludes lease liabilities.
--- ---
(*2) This represents the total guarantee amounts associated with the financial guarantee contracts. Financial<br>guarantee liabilities which are recognized as of March 31, 2025 and December 31, 2024 are ~~W~~38,426 million and ~~W~~30,924 million, respectively.
--- ---

133

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

44. Risk Management, Continued
(2) Financial risk management, continued
--- ---

As the Group manages liquidity based on net assets and net liabilities, information about non-derivative financial assets should be included in the disclosure for better understanding of liquidity risk management.

The expected maturities of non-derivative financial assets as of March 31, 2025 and December 31, 2024 in detail are as follows:

In millions of won As of March 31, 2025
Type Less than<br>1 year 1~5 Years More than<br>5 years Other (*) Total
Cash and cash equivalents ~~W~~ 2,442,980 2,442,980
Financial assets at fair value through other comprehensive income 621,935 621,935
Financial assets at amortized cost 50,283 10,090 60,373
Loans and receivables 99,122 378,907 342,916 138,179 959,124
Long-term/short-term financial Instruments 1,706,871 4,797 814,835 2,526,503
Financial assets at fair value through profit or loss 2,344,231 330,098 744,737 491,081 3,910,147
Trade and other receivables 11,365,765 1,642,103 4,298,952 17,306,820
~~W~~ 18,009,252 2,365,995 5,386,605 2,066,030 27,827,882
In millions of won As of December 31, 2024
--- --- --- --- --- --- --- --- --- --- ---
Type Less than<br>1 year 1~5 Years More than<br>5 years Other (*) Total
Cash and cash equivalents ~~W~~ 2,382,979 2,382,979
Financial assets at fair value through<br><br><br>other comprehensive income 674,850 674,850
Financial assets at amortized cost 20,418 1,333 8,482 30,233
Loans and receivables 110,005 347,251 369,851 118,013 945,120
Long-term/short-term financial<br><br><br>Instruments 1,147,929 583 811,628 1,960,140
Financial assets at fair value through<br><br><br>profit or loss 1,467,954 346,982 780,130 494,710 3,089,776
Trade and other receivables 12,245,159 1,506,085 2,126,928 15,878,172
~~W~~ 17,374,444 2,202,234 3,285,391 2,099,201 24,961,270
(*) The maturities cannot be presently determined.
--- ---

134

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

44. Risk Management, Continued
(2) Financial risk management, continued
--- ---

Derivative liabilities classified by maturity periods from reporting date to maturity dates as per the contracts as of March 31, 2025 and December 31, 2024 are as follows:

As of March 31, 2025
In millions of won<br><br><br>Type Less than<br>1 year 1~2 Years 2~5 Years More than<br>5 years Total
Net settlement
- Trading ~~W~~
Gross settlement
- Trading and others (47,493 ) (73,651 ) (98,948 ) (64,124 ) (284,216 )
- Hedging (237 ) (237 )
~~W~~ (47,493 ) (73,651 ) (98,948 ) (64,361 ) (284,453 )
As of December 31, 2024
In millions of won<br><br><br>Type Less than 1year 1~2 Years 2~5 Years More than<br>5 years Total
Net settlement
- Trading ~~W~~
Gross settlement
- Trading and others (46,087 ) (61,259 ) (73,017 ) (31,760 ) (212,123 )
- Hedging (4,895 ) (4,895 )
~~W~~ (46,087 ) (61,259 ) (73,017 ) (36,655 ) (217,018 )

135

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

44. Risk Management, Continued
(3) Fair value risk
--- ---

The fair value of the Group’s actively-traded financial instruments (i.e., FVTPL, FVOCI, etc.) is based on the traded market-price as of the reporting period end. The fair value of the Group’s financial assets is the amount which the asset could be exchanged for or the amount a liability could be settled for.

The fair values of financial instruments where no active market exists or where quoted prices are not otherwise available are determined by using valuation techniques. Valuation techniques include using recent arm’s length market transactions between knowledgeable, willing parties, if available, reference to the current fair value of another instrument that is substantially the same, discounted cash flow analysis and option pricing models. If there is a valuation technique commonly used by market participants to price the instrument and that technique has been demonstrated to provide reliable estimates of prices obtained in actual market transactions, the Group uses that technique.

For trade receivables and payables, the Group considers the carrying value net of impairment as fair value. While for disclosure purposes, the fair value of financial liabilities is estimated by discounting the future contractual cash flows based on current market interest rates applied to similar financial instruments.

(i) Fair values and book values of financial assets and liabilities as of March 31, 2025 and December 31,<br>2024 are as follows:
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- --- --- --- --- ---
Type Book value Fair value Book value Fair value
Assets recognized at fair value
Financial assets at fair value through<br><br><br>other comprehensive income ~~W~~ 621,935 621,935 674,850 674,850
Derivative assets (trading) 1,880,180 1,880,180 1,846,527 1,846,527
Derivative assets (applying hedge accounting) 771,644 771,644 844,637 844,637
Financial assets at fair value through<br><br><br>profit or loss 3,037,294 3,037,294 2,176,172 2,176,172
~~W~~ 6,311,053 6,311,053 5,542,186 5,542,186
Assets carried at amortized cost
Financial assets at amortized cost ~~W~~ 60,373 60,373 30,233 30,233
Loans and receivables 921,438 921,438 908,148 908,148
Trade and other receivables 14,368,320 14,368,320 15,373,625 15,373,625
Long-term financial instruments 819,632 819,632 812,211 812,211
Short-term financial instruments 1,706,871 1,706,871 1,147,929 1,147,929
Cash and cash equivalents 2,442,980 2,442,980 2,382,979 2,382,979
~~W~~ 20,319,614 20,319,614 20,655,125 20,655,125
Liabilities recognized at fair value
Derivative liabilities (trading) ~~W~~ 280,829 280,829 279,932 279,932
Derivative liabilities (applying hedge accounting) 237 237 4,893 4,893
~~W~~ 281,066 281,066 284,825 284,825
Liabilities carried at amortized cost
Secured borrowings ~~W~~ 1,430,853 1,430,853 1,443,125 1,443,125
Unsecured bond 112,398,357 112,828,822 111,874,019 110,798,858
Lease liabilities 3,552,394 3,552,394 3,699,456 3,699,456
Unsecured borrowings 19,363,240 19,320,007 19,040,213 18,994,676
Trade and other payables (*) 9,475,201 9,475,201 10,321,100 10,321,100
Overdraft 42,499 42,499 176,043 176,043
~~W~~ 146,262,544 146,649,776 146,553,956 145,433,258
(*) Excludes lease liabilities.
--- ---

136

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

44. Risk Management, Continued
(3) Fair value risk, continued
--- ---
(ii) Interest rates used for determining fair value
--- ---

The interest rates used to discount estimated cash flows, when applicable, are based on the government yield curve at the reporting date plus an adequate credit spread.

The discount rates used for calculating fair value as of March 31, 2025 and December 31, 2024 are as follows:

Type As of March 31, 2025 As of December 31, 2024
Derivatives 0.03%~4.88% 0.03%~4.88%
Borrowings and debt securities 0.66%~5.84% 0.96%~5.84%
Leases 0.00%~17.15% 0.00%~17.15%
(iii) Fair value hierarchy
--- ---

The following table provides an analysis of financial instruments that are measured subsequent to initial recognition at fair value, classified as Level 1, 2 or 3, based on the degree to which the fair value is observable.

Level 1: Unadjusted quoted prices in active markets for identical assets or liabilities;
Level 2: Inputs other than quoted prices that are observable for the asset or liability either directly or indirectly; and
Level 3: Inputs that are not based on observable market data.

Fair values of financial instruments by hierarchy level as of March 31, 2025 and December 31, 2024 are as follows:

In millions of won As of March 31, 2025
Type Level 1 Level 2 Level 3 Total
Financial assets at fair value
Financial assets at fair value through other<br><br><br>comprehensive income ~~W~~ 307,059 314,876 621,935
Derivative assets 2,651,824 2,651,824
Financial assets at fair value through<br><br><br>profit or loss 3,030,897 6,397 3,037,294
~~W~~ 307,059 5,682,721 321,273 6,311,053
Financial liabilities at fair value
Derivative liabilities ~~W~~ 281,066 281,066
In millions of won As of December 31, 2024
--- --- --- --- --- --- --- --- ---
Type Level 1 Level 2 Level 3 Total
Financial assets at fair value
Financial assets at fair value through other<br><br><br>comprehensive income ~~W~~ 360,096 314,754 674,850
Derivative assets 2,691,164 2,691,164
Financial assets at fair value through<br><br><br>profit or loss 2,169,300 6,872 2,176,172
~~W~~ 360,096 4,860,464 321,626 5,542,186
Financial liabilities at fair value
Derivative liabilities ~~W~~ 284,825 284,825

The fair value of financial assets traded in the market (including those measured at FVTPL and FVOCI) is measured at the closing bid price quoted at the end of the reporting period. Meanwhile, the fair value of unmarketable financial assets (including those measured at FVTPL and FVOCI) is calculated using the fair value measurement performed by external pricing service agents. In addition, the Group considered the major economic indicators and economic environment of the derivatives to be evaluated, and measured the fair value of the derivatives using a discounted cash flow model that reflects the Group’s credit risk.

137

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

44. Risk Management, Continued
(3) Fair value risk, continued
--- ---

Changes in non-derivative financial assets and liabilities which are classified as level 3 for the three-month period ended March 31, 2025 and for the year ended December 31, 2024 are as follows:

In millions of won For the three-month period ended March 31, 2025
Beginningbalance Acquisitions Reclassifiedcategory Valuation Disposal Foreigncurrencytranslationand others Endingbalance
Financial assets at fair value
Financial assets at fair value through profit or loss Cooperative ~~W~~ 6,872 (475 ) 6,397
Financial assets at fair value through other comprehensive income
Unlisted securities 309,709 (44 ) 166 309,831
Debt securities 5,045 5,045
In millions of won For the year ended December 31, 2024
--- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Beginningbalance Acquisitions Reclassifiedcategory Valuation Disposal Foreigncurrencytranslationand others Endingbalance
Financial assets at fair value
Financial assets at fair value through profit or loss Cooperative ~~W~~ 6,735 22 115 6,872
Financial assets at fair value through other comprehensive income
Unlisted securities 212,762 4,000 88,256 4,691 309,709
Debt securities 4,627 418 5,045

138

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

45. Service Concession Arrangements
(1) Hydroelectric Power Generation at Semangka, Indonesia (BOT)
--- ---
(i) Significant terms and concession period of the arrangement
--- ---

Regarding Semangka hydroelectric power-generation business (BOT) in Indonesia, the Group has entered into a contract with PT. Perusahaan Listrik Negara (the “PT PLN”) whereby the Group shall provide electricity generated for about 30 years (2018 – 2048) after subsequent to the completion of plant construction and shall receive charge tariff rates designed to recover capital cost, fixed O&M cost, water usage cost, variable O&M cost and special facilities cost during the concession period.

(ii) Rights and classification of the arrangement

The Group has the rights to use and own the power plant during the concession period from 2018 to 2048. At the end of the concession period, PT PLN has an option to take over the ownership of the power plant from the Group.

(iii) Classification method

This project allows PT PLN to acquire ownership of the plant after the end of the 30 years contract period.

(iv) The Group’s expected future collections of service concession arrangements as of March 31, 2025 are<br>as follows:
In millions of won
--- --- ---
Type Amounts
Less than 1 year ~~W~~ 36,730
1 ~ 2 years 36,775
2 ~ 3 years 36,949
Over 3 years 549,028
~~W~~ 659,482

139

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

45. Service Concession Arrangements, Continued
(2) Pakistan Gulpur Hydropower Project
--- ---
(i) Significant terms and concession period of the arrangement
--- ---

The Group has entered into a contract with CPPAg (Central Power Purchasing Agency Guarantee Limited) whereby the Group shall provide electricity generated for approximately 30 years (2020 – 2050) subsequent to the completion of plant construction and shall receive charge tariff rates designed to recover capital cost, variable O&M cost, fixed O&M cost, water usage cost, insurance cost and others during the concession period.

(ii) Rights and classification of the arrangement

The Group has the rights to use and own the power plant during the concession period from 2020 to 2050. The Government of Pakistan has an option to take over the ownership of the power plant from the Group after the concession period has elapsed.

(iii) Classification method

This project allows the Government of Pakistan to acquire ownership of the plant after the end of the contract period.

(iv) The Group’s expected future collections of service concession arrangements as of March 31, 2025 are<br>as follows:
In millions of won
--- --- ---
Type Amounts
Less than 1 year ~~W~~ 81,819
1 ~ 2 years 81,819
2 ~ 3 years 81,819
Over 3 years 908,374
~~W~~ 1,153,831

140

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

45. Service Concession Arrangements, Continued
(3) Guam Ukudu Combined thermal power plant Project
--- ---
(i) Significant terms and concession period of the arrangement
--- ---

The Group has entered into a contract with Guam Power Authority whereby the Group shall provide electricity generated for approximately 25 years (from 2025 to 2050) subsequent to the completion of plant construction and shall receive charge tariff rates designed to recover variable O&M cost, fixed O&M cost and others during the concession period.

(ii) Rights and classification of the arrangement

The Group has the rights to use and own the power plant during the concession period from 2025 to 2050. The Guam Power Authority has an option to take over the ownership of the power plant from the Group after the concession period has elapsed.

(iii) Classification method

This project allows the Guam Power Authority to acquire ownership of the plant after the end of the contract period.

(iv) The Group’s expected future collections of service concession arrangements as of March 31, 2025 are<br>as follows:
In millions of won
--- --- ---
Type Amounts
Less than 1 year ~~W~~ 58,379
1 ~ 2 years 117,522
2 ~ 3 years 118,588
Over 3 years 2,908,205
~~W~~ 3,202,694

141

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

46. Related Parties
(1) The Group’s related parties as of March 31, 2025 are as follows:
--- ---
Type Related party
--- ---
Parent Republic of Korea government
Subsidiaries<br> <br>(167 subsidiaries) Korea Hydro & Nuclear Power Co., Ltd., Korea South-East Power Co., Ltd., Korea Midland Power Co., Ltd., Korea Western Power Co., Ltd., Korea Southern Power Co., Ltd., Korea East-West Power Co., Ltd., KEPCO Engineering &<br>Construction Company, Inc., KEPCO Plant Service & Engineering Co., Ltd., KEPCO Nuclear Fuel Co., Ltd., KEPCO KDN Co., Ltd., Gyeonggi Green Energy Co., Ltd., Korea Offshore Wind Power Co., Ltd., KOSEP Material Co., Ltd., KEPCO International<br>HongKong Ltd., KEPCO International Philippines Inc., KEPCO Philippines Corporation, KEPCO Ilijan Corporation, KEPCO Gansu International Ltd., KEPCO Philippines Holdings Inc., KEPCO Neimenggu International Ltd., KEPCO Australia Pty., Ltd., KEPCO<br>Shanxi International Ltd., KOMIPO Global Pte Ltd., KOSEP Australia Pty., Ltd., KOMIPO Australia Pty., Ltd., KOWEPO Australia Pty., Ltd., KOSPO Australia Pty., Ltd., KEPCO Netherlands B.V., KEPCO Middle East Holding Company, Qatrana Electric Power<br>Company, KOWEPO International Corporation, KOSPO Jordan LLC, Korea Waterbury Uranium Limited Partnership, PT. Cirebon Power Service, EWP America Inc., KHNP Canada Energy Ltd., KEPCO Bylong Australia Pty., Ltd., KNF Canada Energy Limited, KEPCO<br>Holdings de Mexico, KST Electric Power Company, S.A.P.I. de C.V., KEPCO Energy Service Company, KEPCO Netherlands S3 B.V., PT. KOMIPO Pembangkitan Jawa Bali, EWP Barbados 1 SRL, PT. Tanggamus Electric Power, KOMIPO America Inc., PT. EWP Indonesia,<br>KEPCO Netherlands J3 B.V., Global One Pioneer B.V., Global Energy Pioneer B.V., Mira Power Limited, KEPCO KPS Philippines Corp., KOSPO Chile SpA, Commerce and Industry Energy Co., Ltd., Gyeongju Wind Power Co., Ltd., California Power Holdings, LLC,<br>EWP Renewable Corporation, Hee Mang Sunlight Power Co., Ltd., Fujeij Wind Power Company, KOSPO Youngnam Power Co., Ltd., Chitose Solar Power Plant LLC., KEPCO Solar Co., Ltd., KEPCO ES Co., Ltd., KOSPO Power Services Ltda., KOEN Bylong Pty., Ltd.,<br>KOWEPO Bylong Pty., Ltd., KOSPO Bylong Pty., Ltd., EWP Bylong Pty., Ltd., KOWEPO Lao International, KOMIPO Bylong Pty., Ltd., Energy New Industry Specialized Investment Private Investment Trust., KEPCO Mangilao Holdings LLC, Mangilao Investment LLC,<br>KEPCO Mangilao Solar, LLC, Jeju Hanlim Offshore Wind Co., Ltd., PT. Siborpa Eco Power, e-New Industry LB Fund 1, Songhyun e-New Industry Fund, BSK E-New Industry Fund VII, PT. Korea Energy Indonesia, KOLAT SpA, KEPCO California, LLC, KEPCO Mojave<br>Holdings, LLC, Incheon Fuel Cell Co., Ltd., KOEN Service Co., Ltd., KOMIPO Service Co., Ltd., KOWEPO Service Co., Ltd., KOSPO Service Co., Ltd., EWP Service Co., Ltd., PT. KOMIPO Energy Indonesia, KNF Partners Co., Ltd., KOSPO USA Inc., KOSPO Niles<br>LLC (formerly, Nambu USA LLC), Tamra Offshore Wind Power Co., Ltd., KEPCO MCS Co., Ltd., KEPCO FMS Co., Ltd., Firstkeepers Co., Ltd., Secutec Co., Ltd., SE Green Energy Co., Ltd., Mangilao Intermediate Holdings LLC, KEPCO CSC Co., Ltd., KOAK Power<br>Limited, KOMIPO Europe B.V., Haenanum Energy Fund, Paju Ecoenergy Co., Ltd., Guam Ukudu Power LLC, K-SOLAR SHINAN Co., Ltd., KPS Partners Co., Ltd., KEPCO E&C Service Co., Ltd., Moha solar Co., Ltd., KHNP USA LLC, KOMIPO Vanphong Power Service<br>LLC, Ogiri Solar Power Co., Ltd., BSK E-New Industry Fund X, Energy Innovation Fund I, KHNP Chile SpA, Yeong Yang Apollon Photovoltaic Co., Ltd., Yeong Yang Corporation Co., Ltd., SolarVader Co., Ltd., Yeong Yang Innovation Co., Ltd., Yeong Yang<br>Horus Photovoltaic Co., Ltd., Yeong Yang Solar Management Co., Ltd., LSG Hydro Power Limited, KOEN Bio Co., Ltd., KOMIPO Energy Solution America, LLC, Elara Investment Holdings, LLC, Elara Equity Holdings, LLC, Elara Class B Holdings, LLC, Elara<br>Class B Member, LLC, Elara Development Holdings, LLC, KOMIPO Development, LLC, Elara Energy Holdings, LLC, Elara Energy Project, LLC, KOMIPO Iberian Solar Group, S.L.U., KOWEPO Europe B.V., CVS Equity Holdings, LLC, CVS Class B Holdings, LLC, CVS<br>Development Holdings, LLC, CVS Development, LLC, CVS Class B Member, LLC, CVS Energy Holdings, LLC, Concho Valley Energy, LLC, Concho Valley Solar, LLC, Jeongam Wind Power Co., Ltd., Yeongdeok Sunrise Wind Power Co., Ltd., UI Carbon-Neutrality Fund,<br>KA Power Limited, Western Power Changgi Solar Co., Ltd., Digital Innovation Growth Fund, EWP Australia Pty., Ltd., Columboola Solar Farm Hold Co Pty., Ltd., J Wind First, LLC, KEPCO Holding Company, KEPCO for Maintenance Company, KOSPO Trumbull LLC,<br>Changjuk Wind Power Co., Ltd., KEPCO KPS South Africa Pty., Ltd., Chile Solar JV SpA, KOWEPO Holding Limited, Columboola Solar Farm Nominees Pty., Ltd., Columboola Solar Farm Op Trust, Columboola Solar Farm Fin Co Pty., Ltd., Magna Energy New<br>Industrial Fund, EWP ESS Holdings, LLC, Fairhaven ESS LLC, KOSPO Rutile, LLC, Sprott Chile Solar I SpA

142

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

46. Related Parties, Continued
(1) The Group’s related parties as of March 31, 2025 are as follows, continued:
--- ---
Type Related party
--- ---
Associates<br> <br>(102 entities)<br><br><br>(*1) Dongducheon Dream Power Co., Ltd., Korea Gas Corporation, Daegu Photovoltaic Co., Ltd., Haeng Bok Do Si Photovoltaic Power Co., Ltd., Korea Electric Power Industrial Development Co., Ltd., Goseong Green Power Co., Ltd., Gangneung<br>Eco Power Co., Ltd., Shin Pyeongtaek Power Co., Ltd., Noeul Green Energy Co., Ltd., Gangwon Wind Power Co., Ltd., Gwangyang Green Energy Co., Ltd., Hyundai Green Power Co., Ltd., Korea Power Exchange, Taebaek Guinemi Wind Power Co., Ltd., Daeryun<br>Power Co., Ltd., KNH Solar Co., Ltd., S-Power Co., Ltd., SPC Power Corporation, Gemeng International Energy Co., Ltd., PT. Cirebon Electric Power, KNOC Nigerian East Oil Co., Ltd., KNOC Nigerian West Oil Co., Ltd., PT Wampu Electric Power, PT. Bayan<br>Resources TBK, Nepal Water & Energy Development Company Private Limited, Xe-Pian Xe-Namnoy Power Co., Ltd., PT. Mutiara Jawa, Jinbhuvish Power Generation Pvt. Ltd., Daejung Offshore Wind Power Co., Ltd., GS Donghae Electric Power Co., Ltd.,<br>Busan Green Energy Co., Ltd., Hansuwon KNP Co., Ltd., Korea Electric Power Corporation Fund, Energy Infra Asset Management Co., Ltd., Yaksu ESS Co., Ltd., PND Solar Co., Ltd., Hyundai Eco Energy Co., Ltd., YeongGwang Yaksu Wind Electric Co., Ltd.,<br>Green Energy Electricity Generation Co., Ltd., Korea Energy Solutions Co., Ltd., ITR Co., Ltd., STN Co., Ltd., Indeck Niles Development, LLC, Indeck Niles Asset Management, LLC, Hanwha Corporation-linked Sunlight Power Special Private Equity<br>Investment Trust No. 1, Suwon New Power Co., Ltd., Gwangbaek Solar Power Investment Co., Ltd., Go deok Clean Energy Co., Ltd., SureDataLab Co., Ltd., SEP Co., Ltd., Hankook Electric Power Information Co., Ltd., Tronix Co., Ltd., O2&B Global Co.,<br>Ltd., Muan Sunshine Solar Power Plant Co., Ltd., Bigeum Resident Photovoltaic Power Co., Ltd., Goesan Solar park Co., Ltd., Saemangeum Heemang Photovoltaic Co., Ltd., Bitgoel Eco Energy Co., Ltd., Jeju Gimnyeong Wind Power Co., Ltd., Seoroseoro<br>Sunny Power Plant Co., Ltd., Muan Solar Park Co., Ltd., YuDang Solar Co., Ltd., Anjwa Smart Farm & Solar City Co., Ltd., KPE Green Energy Co., Ltd., G.GURU Co., Ltd., UD4M Co., Ltd., Dongbu Highway Solar Co., Ltd., Seobu Highway Solar Co., Ltd.,<br>Korea Energy Data Co., Ltd., Gangneung Sacheon Fuel Cell Co., Ltd., Taebaek Gadeoksan Wind Power Co., Ltd., Chuncheon Green Energy Co., Ltd., Yeomsubong Wind Power Co., Ltd., Yeongyang Wind Power Corporation II, Haeparang Energy Co., Ltd.,<br>Saemangeum Sebit Power Plant Co., Ltd., PlatformN. Co., Ltd., PT. Cirebon Energi Prasarana, Future Convergence Technology Laboratory. Co., Ltd., ECO Motion Co., Ltd., REC’s Innovation Co., Ltd., ACE, Co., Ltd., Environment and Energy Co., Ltd.,<br>Green Radiation Co., Ltd., Santiago Solar Power SpA, Yanggu Floating Photovoltaic Power Plant Inc., Changwon SG energy Co., Ltd., Donpyung Technology. Co., Ltd., Power Embedded, HORANG ENERGY Inc., Hoenggye Renewable Energy Co., Ltd., Haman Green<br>Energy Co., Ltd., Songsan Green Energy Co., Ltd., SkyPic Inc., HyChangwon Fuel Cell. Co., Ltd., Dreams Co.,Ltd., DEEPAI Co.,Ltd., Amaala Sustainable Company for Energy, Remal First Holding Company, Naseem First Holding Company,Cheonwang Green Energy<br>Co., Ltd., Namjeju Bitdream Energy Co., Ltd.
Joint ventures<br> <br>(118 entities)<br><br><br>(*1) Daegu Green Power Co., Ltd., KEPCO SPC Power Corporation, KAPES, Inc., Honam Wind Power Co., Ltd., Korea Power Engineering Service Co., Ltd., Seokmun Energy Co., Ltd., Incheon New Power Co., Ltd., Chun-cheon Energy Co., Ltd.,<br>Yeonggwangbaeksu Wind Power Co., Ltd., KW Nuclear Components Co., Ltd., Busan Shinho Solar Power Co., Ltd., Global Trade Of Power System Co., Ltd., Expressway Solar-light Power Generation Co., Ltd., Gansu Datang Yumen Wind Power Co., Ltd., Datang<br>Chifeng Renewable Power Co., Ltd., Rabigh Electricity Company, Rabigh Operation & Maintenance Company Limited, Datang KEPCO Chaoyang Renewable Power Co., Ltd., Shuweihat Asia Power Investment B.V., Shuweihat Asia Operation & Maintenance<br>Company, Waterbury Lake Uranium L.P., ASM-BG Investicii AD, RES Technology AD, Jamaica Public Service Company Limited, KV Holdings, Inc., Amman Asia Electric Power Company, Kelar S.A., PT. Tanjung Power Indonesia, Nghi Son 2 Power LLC, Daehan Wind<br>Power PSC, MOMENTUM, Barakah One Company, Nawah Energy Company, Yeonggwang Wind Power Co., Ltd., Chester Solar IV SpA, Chester Solar V SpA, Diego de Almagro Solar SpA, South Jamaica Power Company Limited, Daesan Green Energy Co., Ltd., RE Holiday<br>Holdings LLC, RE Pioneer Holdings LLC, RE Barren Ridge 1 Holdings LLC, RE Astoria 2 LandCo LLC, RE Barren Ridge LandCo LLC, Laurel SpA, KIAMCO KOWEPO Bannerton Hold Co Pty Ltd, Cheong-Song Noraesan Wind Power Co., Ltd., Chester Solar I SpA, Solar<br>Philippines Calatagan Corporation, Saemangeum Solar Power Co., Ltd., Chungsongmeon BongSan wind power Co., Ltd., Jaeun Resident Wind Power Plant Co., Ltd., Dangjin Eco Power Co., Ltd., Haemodum Solar Co., Ltd., Yangyang Wind Power Co., Ltd., Horus<br>Solar, S.A. de C.V., Recursos Solares PV de Mexico II, S.A. de C.V., Sunmex Renovables, S.A. de C.V., Stavro Holding II A.B., Solaseado Solar Power Co., Ltd., Yeongam Solar Power Co., Ltd., Samsu Wind Power Co., Ltd., Pulau Indah Power Plant Sdn.<br>Bhd., NH-Amundi Global Infrastructure Investment Private Investment Trust 21, Shin-han BNPP Private Investment Trust for East-West Sunlight Dream, PT Barito Wahana Tenaga, Cheongna Energy Co., Ltd., Boim Combined Heat and Power Generation Co., Ltd.,<br>OneEnergy Asia Limited, KAS INVESTMENT I LLC, KAS INVESTMENT II LLC, Energyco Co., Ltd., CAES, LLC, Hapcheon Floating Photovoltaic Power Plant Inc., Busan Industrial Solar Power Co., Ltd., Bitsolar Energy Co., Ltd., Naepo Green Energy Co., Ltd.,<br>Pulau Indah O&M Sdn. Bhd., Guadalupe Solar SpA, Omisan Wind Power Co., Ltd., Foresight Iberian Solar Group Holding, S.L., Yeongwol Eco Wind Co., Ltd., Gurae Resident Power Co., Ltd., Cheongju Eco Park Co., Ltd., Prime Swedish Holding AB, Enel X<br>Midland Photovoltaic, LLC, Geumsungsan Wind Power Co., Ltd., KEPCO KPS CARABAO Corp., Goheung New Energy Co., Ltd., Gunsan Land Solar Co., Ltd., CapMan Lynx SCA, SICAR, International Offshore Power Transmission Holding Company Limited, Eumseong Eco<br>Park Co., Ltd., Changwon Nu-ri Energy Co., Ltd., PungBack Wind Farm Corporation, Seobusambo highway photovoltaics Co., Ltd., Seokmun Green Energy, Pyeongchang Wind Power Co., Ltd., Trumbull Asset Management, LLC, S-Power Chile SpA, Taebaek Wind<br>Power Co., Ltd., Yangyang Suri Wind Power Co., Ltd., KEPCO for Power Company, Jeonju Bio Green Energy Co., Ltd., Kumyang Eco Park Co., Ltd., Jeongeup Green Power Co., Ltd., Hadong E-factory Co., Ltd., Namyangju Combined Heat and Power Co., Ltd.,<br>Wadi Noor Solar Power Company SAOC, Fairhaven Energy Storage LLC, Rutile BESS Holdings, LLC, Trumbull Development Partners, LLC, Samcheok Eco Materials Co., Ltd., Imha Floating Photovoltaic Power Plant Inc., Roof One Energy Co., Ltd., EDFR KOWEPO<br>AJBAN PV HOLDING LIMITED, Taean Haetdeulwon Solar Co., Ltd., Haetbyeotgil Solar Co., Ltd.
Others<br> <br>(1 entity) Korea Development Bank
(*1) Subsidiaries of associates and joint ventures are included.
--- ---

143

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

46. Related Parties, Continued
(2) Transactions between the Group and its subsidiaries are eliminated during the consolidation and are notdisclosed in notes.
--- ---
(3) The related party transactions for the three-month periods ended March 31, 2025 and 2024 are asfollows:
--- ---

<Sales and Others>

In millions of won Sales and others
Company name Transaction type March 31, 2025 March 31, 2024
<Associates>
Korea Gas Corporation Electricity sales ~~W~~ 77,808 42,592
Goseong Green Power Co., Ltd. Electricity Sales 130,326 176,040
Dongducheon Dream Power Co., Ltd. Electricity sales 3,000 2,960
Shin Pyeongtaek Power Co., Ltd. Electricity sales 6,152 28,993
S-Power Co., Ltd. Service 597 613
Gangneung Eco Power Co., Ltd. Fuel sales 137,167 176,824
GS Donghae Electric Power Co., Ltd. Electricity sales 14,680 2,133
Korea Power Exchange Service 7,557 3,054
Daeryun Power Co., Ltd. Electricity sales 1,112 1,030
Korea Electric Power Industrial Development Co., Ltd. Service 5,101 3,551
Chuncheon Green Energy Co., Ltd. Electricity sales 5,531 9
Gangneung Sacheon Fuel Cell Co., Ltd. Electricity sales 3,492 3
Taebaek Gadeoksan Wind Power Co., Ltd. Electricity sales 3,175 1,949
KPE Green Energy Co., Ltd. Electricity Sales 3 4
Gangwon Wind Power Co., Ltd. Electricity sales 1,448 1,486
Bitgoel Eco Energy Co., Ltd. Service 1,210 2,179
Busan Green Energy Co., Ltd. Electricity sales 2,019 2,137
Noeul Green Energy Co., Ltd. Electricity sales 2,097 2,618
Muan Solar Park Co., Ltd. Electricity sales 1,476 1,515
Saemangeum Sebit Power Plant Co., Ltd. Electricity sales 400 345
Go deok Clean Energy Co., Ltd. Electricity sales 683 6,699
Others (Anjwa Smart Farm & Solar City Co., Ltd. and 44 others) Electricity sales 15,082 18,222
<Joint ventures>
Chun-cheon Energy Co., Ltd. Electricity sales 241 832
Daegu Green Power Co., Ltd. Electricity sales 511 388
Daesan Green Energy Co., Ltd. Electricity sales 40 40
KAPES, Inc. Others 1,992 1,207
Cheongna Energy Co., Ltd. Others 19,455 15,037
Seokmun Energy Co., Ltd. Service 627 586
Naepo Green Energy Co., Ltd. Electricity sales 14,266 670
Jamaica Public Service Company Limited Others 9,700
Cheongju Eco Park Co., Ltd. Electricity sales 5 91
KW Nuclear Components Co., Ltd. Service 851 1,088
Solaseado Solar Power Co., Ltd. Electricity sales 455 453
Yeonggwang Wind Power Co., Ltd. Electricity sales 314 284
Yeongam Solar Power Co., Ltd. Electricity sales 134 150
Amman Asia Electric Power Company Others 6,212 4,772
Eumseong Eco Park Co., Ltd. Electricity sales 5 5
Kelar S.A. Electricity sales 5,567 5,905
Yeonggwangbaeksu Wind Power Co., Ltd. Electricity sales 508 493
Gunsan Land Solar Co., Ltd. Electricity sales 3,218 240
Bitsolar Energy Co., Ltd. Electricity sales 109 91
Others (Samsu Wind Power Co., Ltd. and 55 others) Electricity sales 75,658 63,483
<Others>
Korea Development Bank Electricity sales 1,716 1,320
Interest income 1,400 6,225
~~W~~ 563,100 578,316

144

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

46. Related Parties, Continued
(3) The related party transactions for each of the three-month periods ended March 31, 2025 and 2024 are asfollows, continued:
--- ---

<Purchase and Others>

In millions of won Purchase and others
Company name Transaction type March 31, 2025 March 31, 2024
<Associates>
Korea Gas Corporation Electricity sales ~~W~~ 1,489,030 1,852,694
Goseong Green Power Co., Ltd. Electricity Sales 273,261 300,442
Dongducheon Dream Power Co., Ltd. Electricity sales 348,507 406,861
Shin Pyeongtaek Power Co., Ltd. Electricity sales 219,586 261,380
S-Power Co., Ltd. Service 177,565 216,476
Gangneung Eco Power Co., Ltd. Fuel sales 4,372 672
GS Donghae Electric Power Co., Ltd. Electricity sales 121,939 165,761
Korea Power Exchange Service 128,198 22,927
Daeryun Power Co., Ltd. Electricity sales 93,872 89,809
Korea Electric Power Industrial Development Co., Ltd. Service 73,771 73,918
PT. Bayan Resources TBK Others 29,584 19,728
Chuncheon Green Energy Co., Ltd. Electricity sales 13,855 10,723
Gangneung Sacheon Fuel Cell Co., Ltd. Electricity sales 12,466 4,308
Taebaek Gadeoksan Wind Power Co., Ltd. Electricity sales 9,094 7,110
KPE Green Energy Co., Ltd. Electricity Sales 10,374 11,233
Gangwon Wind Power Co., Ltd. Electricity sales 8,429 6,473
Bitgoel Eco Energy Co., Ltd. Service 6,737 9,073
Busan Green Energy Co., Ltd. Electricity sales 5,455 5,623
Noeul Green Energy Co., Ltd. Electricity sales 5,281 4,530
Yeongyang Wind Power Corporation II Service 7,370 1,973
Muan Solar Park Co., Ltd. Electricity sales 4,435 3,462
Saemangeum Sebit Power Plant Co., Ltd. Electricity sales 4,607 3,131
Go deok Clean Energy Co., Ltd. Electricity sales 4,224 13,899
Others (Anjwa Smart Farm & Solar City Co., Ltd. and 44 others) Electricity sales 42,404 26,164
<Joint ventures>
Chun-cheon Energy Co., Ltd. Electricity sales 105,924 110,336
Daegu Green Power Co., Ltd. Electricity sales 82,295 106,402
Daesan Green Energy Co., Ltd. Electricity sales 44,138 43,457
KAPES, Inc. Others 27,032 1,830
Cheongna Energy Co., Ltd. Others 63 62
Seokmun Energy Co., Ltd. Service 14,210 11,450
Jamaica Public Service Company Limited Others 52 57
Cheongju Eco Park Co., Ltd. Electricity sales 9,698 5,241
KW Nuclear Components Co., Ltd. Service 8,023
Solaseado Solar Power Co., Ltd. Electricity sales 8,034 6,787
Yeonggwang Wind Power Co., Ltd. Electricity sales 7,894 20,280
Yeongam Solar Power Co., Ltd. Electricity sales 7,488 4,051
Seokmun Green Energy Electricity sales 7,355 7,209
Eumseong Eco Park Co., Ltd. Electricity sales 5,960 6,889
Yeonggwangbaeksu Wind Power Co., Ltd. Electricity sales 3,723 3,379
Gunsan Land Solar Co., Ltd. Electricity sales 914 459
Bitsolar Energy Co., Ltd. Electricity sales 3,580 3,103
Others (Samsu Wind Power Co., Ltd. and 54 others) Electricity sales 35,224 22,691
<Others>
Korea Development Bank Interest expense 2,663 1,027
~~W~~ 3,468,686 3,873,080

145

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

46. Related Parties, Continued
(4) Receivables and payables arising from the related party transactions as of March 31, 2025 and<br>December 31, 2024 are as follows:
--- ---
In millions of won Receivables Payables
--- --- --- --- --- --- --- --- --- ---
Company name Type March 31, 2025 December 31, 2024 March 31, 2025 December 31, 2024
<Associates>
Korea Gas Corporation Trade receivables ~~W~~ 53,627 15,766
Non-trade receivables and others 56,427 404
Trade payables 490,185 482,008
Non-trade payables and others 394 1,486
Goseong Green Power Co., Ltd. Trade receivables 8,200 30,732
Non-trade receivables and others 1,079 1,438
Trade payables 59,386 162,719
Non-trade payables and others 44,635 45,174
Dongducheon Dream Power Co., Ltd. Trade receivables 411 6,350
Non-trade receivables and others 446 637
Trade payables 120,885 114,962
Non-trade payables and others 1 29
GS Donghae Electric Power Co., Ltd. Trade receivables 22 22
Non-trade receivables and others 109 109
Trade payables 112,589 90,468
Non-trade payables and others 52
Shin Pyeongtaek Power Co., Ltd. Trade receivables 1,539 1,720
Non-trade receivables and others 2,569 5,812
Trade payables 67,038 77,222
Non-trade payables and others 329 2,450
S-Power Co., Ltd. Trade receivables 150 264
Non-trade receivables and others 60 54
Trade payables 71,150 73,377
Non-trade payables and others 19
Busan Green Energy Co., Ltd. Trade receivables 2 1
Non-trade receivables and others 46,057 43,790
Trade payables
Non-trade payables and others 3,478 4,799
Noeul Green Energy Co., Ltd. Trade receivables 5 5
Non-trade receivables and others 29,325 27,043
Trade payables
Non-trade payables and others 3,340 3,699
Chuncheon Green Energy Co., Ltd. Trade receivables
Non-trade receivables and others 16,401 10,870
Trade payables
Non-trade payables and others 9,185 8,881
Others (Daeryun Power Co., Ltd. and 42 others) Trade receivables 17,583 21,449
Non-trade receivables and others 56,719 76,369
Trade payables 58,319 77,583
Non-trade payables and others 17,727 20,254

146

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

46. Related Parties, Continued
(4) Receivables and payables arising from the related party transactions as of March 31, 2025 andDecember 31, 2024 are as follows, continued:
--- ---
In millions of won Receivables Payables
--- --- --- --- --- --- --- --- --- ---
Company name Type March 31, 2025 December 31, 2024 March 31, 2025 December 31, 2024
<Joint ventures>
Kapes Inc. Trade receivables ~~W~~ 3 4
Non-trade receivables and others 85,924 90,088
Trade payables
Non-trade payables and others 14 3,041
Nghi Son 2 Power LLC Trade receivables
Non-trade receivables and others 40,065 4,120
Trade payables
Non-trade payables and others
Kelar S.A. Trade receivables 2,522 3,244
Non-trade receivables and others 37,378 36,010
Trade payables
Non-trade payables and others
Boim Combined Heat and Power Generation Co., Ltd. Trade receivables 94 47
Non-trade receivables and others 22,486 3,208
Trade payables 174 445
Non-trade payables and others 13,609 13,824
Chun-cheon Energy Co., Ltd. Trade receivables
Non-trade receivables and others 165
Trade payables 32,991 35,325
Non-trade payables and others
Others (Amman Asia Electric Power<br><br><br>Company and 57 others) Trade receivables 358,124 275,692
Non-trade receivables and others 44,984 44,733
Trade payables 56,831 62,730
Non-trade payables and others 25,050 38,224
<Others>
Korea Development Bank Accrued Interest Receivable ~~W~~ 1,995
Non-trade receivables and others 29,404 34,138
Non-trade payables and others 46,665 231
Derivatives and others 277,169 273,627 2,421
~~W~~ 1,191,044 1,007,746 1,234,027 1,321,371

147

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

46. Related Parties, Continued
(5) Loans and others arising from the related party transactions as of March 31, 2025 and December 31,2024 are as follows:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Type Company name Beginningbalance Loans Collection Others Ending<br>balance
Associates KNOC Nigerian East Oil Co., Ltd.,<br> <br>KNOC<br>Nigerian West Oil Co., Ltd. ~~W~~ 33,066 33,066
(Allowance for doubtful accounts) (33,066 ) (33,066 )
Associates Xe-Pian Xe-Namnoy Power Co., Ltd. 26,606 (63 ) 26,543
Associates PT. Cirebon Energi Prasarana 38,865 468 39,333
Associates Daejung Offshore Wind Power Co., Ltd. 1,000 1,000
Associates Bitgoel Eco Energy Co., Ltd. 26,625 (1,065 ) 25,560
Associates Saemangeum Sebit Power Plant Co., Ltd. 27,550 (364 ) 27,186
Joint ventures Solaseado Solar Power Co., Ltd. 34,929 (250 ) 34,679
Joint ventures Recursos Solares PV de Mexico II, S.A. de C.V. 14,313 (34 ) 14,279
Joint ventures Horus Solar, S.A. de C.V. 13,677 (33 ) 13,644
Joint ventures Sunmex Renovables, S.A. de C.V. 21,793 1,292 (21 ) 23,064
Joint ventures Kelar S.A. 19,291 (10 ) (78 ) 19,203
Joint ventures DE Energia SpA 8,420 (8,420 )
Joint ventures Daehan Wind Power PSC 16,956 (595 ) (50 ) 16,311
Joint ventures Bitsolar Energy Co., Ltd. 3,165 3,165
Joint ventures Daesan Green Energy Co., Ltd. 2,491 2,491
Joint ventures Yangyang Wind Power Co., Ltd. 3,257 3,257
Joint ventures Nghi Son 2 Power LLC 168,601 (9,759 ) (532 ) 158,310
Joint ventures Guadalupe Solar SpA 3,352 (87 ) (9 ) 3,256
Joint ventures Foresight Iberian Solar Group Holding,<br><br><br>S.L. 71,137 1,102 2,751 74,990
Joint ventures Capman Lynx SCA, SICAR 35,210 35,210
(Allowance for doubtful accounts) (35,210 ) (35,210 )
Joint ventures S-Power Chile SpA 294 (1 ) 293
Joint ventures Omisan Wind Power Co., Ltd. 8,894 8,894
~~W~~ 511,216 2,394 (20,550 ) 2,398 495,458
(6) Borrowings arising from the related party transactions as of March 31, 2025 and December 31, 2024are as follows:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- --- --- --- --- ---
Related parties Type Beginningbalance Borrowings Repayment Others Ending<br>balance
Korea Development Facility ~~W~~ 84,653 (4,050 ) 7,274 87,877
Bank Others 1,424 (82 ) 1,342
Operating funds 100,000 130,000 (100,000 ) 130,000
EBL and others 149,862 2,051 (10,198 ) (217 ) 141,498
~~W~~ 335,939 132,051 (114,330 ) 7,057 360,717

148

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

46. Related Parties, Continued
(7) Guarantees provided to the related parties as of March 31, 2025 are as follows:
--- ---
In millions of won and thousands of foreign currencies
--- --- --- --- --- ---
Primary guarantor Principal obligor Type of guarantees Credit limit Creditor
Korea Electric Power Corporation Shuweihat Asia Operation & Maintenance Company Performance guarantees USD 11,000 Shuweihat Asia Power Investment B.V.
Korea Electric Power Corporation Rabigh Operation & Maintenance Company Limited Performance guarantees USD 1,387 Rabigh Electricity Company
Korea Electric Power Corporation Nghi Son 2 Power LLC Certification of payment on L/C USD 42,750 SMBC Singapore and others
Korea Electric Power Corporation Barakah One Company Performance guarantees and others USD 3,989,842 FAB and others
Korea Electric Power Corporation RE Holiday Holdings LLC Performance guarantees (*9) USD 203,981 EFS Renewables Holdings, LLC, CA-CIB and others
Korea Electric Power Corporation RE Pioneer Holdings LLC Performance guarantees USD 106,873 EFS Renewables Holdings, LLC
Korea Electric Power Corporation Rabigh Electricity Company Performance guarantees SAR 4,151 Hana Bank
Korea Electric Power Corporation Shuweihat Asia Power Investment B.V. Certification of payment on L/C USD 9,800 Hana Bank
Korea Electric Power Corporation Amman Asia Electric Power Company Certification of payment on L/C USD 15,600 ING Bank
Korea Electric Power Corporation Horus Solar, S.A. de C.V. Other performance guarantees MXN 14,843 CENACE and others
Korea Electric Power Corporation Recursos Solares PV de Mexico II, S.A. de C.V. Other performance guarantees MXN 1,518 SEMARNAT
USD 393 CFE Transmission
Korea Electric Power Corporation Sunmex Renovables, S.A. de C.V. Other performance guarantees USD 9,078 CENACE
MXN 4,929 CFE Transmission<br><br><br>and others
Korea Electric Power Corporation International Offshore Power Performance guarantees USD 52,500 Mizuho Bank
Other performance guarantees USD 7,000 Credit Agricole
Korea Electric Power Corporation Pulau Indah Power Plant Sdn. Bhd. Collateralized money invested (*10) MYR 25,350 Malaysian Trustee Berhad
Korea Electric Power Corporation KEPCO for Power Company Debt guarantees USD 60,000 Riyad bank
Other performance guarantees USD 70,000 SMBC Seoul
Korea Electric Power Corporation Remal First Holding Company Debt Guarantee (*15) USD 138,000 DBS BANK LTD. (DIFC BRANCH)
Korea Electric Power Corporation Naseem First Holding Company Debt Guarantee (*15) USD 138,000 DBS BANK LTD. (DIFC BRANCH)
Korea Western Power Co., Ltd. Cheongna Energy Co., Ltd. Collateralized money invested KRW 63,828 Kookmin Bank and others
Guarantees for supplemental funding (*1)
Korea Western Power Co., Ltd. Xe-Pian Xe-Namnoy Power Co., Ltd. Collateralized money invested KRW 73,870 Krung Thai Bank
Impounding bonus guarantees (*11) USD 5,000 SK Eco Plant Co., Ltd.
Korea Western Power Co., Ltd. Rabigh Operation & Maintenance Company Limited Performance guarantees and others SAR 11,200 National Bank of Kuwait
Korea Western Power Co., Ltd. Dongducheon Dream Power Co., Ltd. Collateralized money invested (*5) KRW 51,325 Kookmin Bank and others
Debt guarantees KRW 20,300 HY western 1^st^ co., Ltd
Korea Western Power Co., Ltd. PT. Mutiara Jawa Collateralized money invested KRW 4,049 Woori Bank
Korea Western Power Co., Ltd. Haeng Bok Do Si Photovoltaic Power Co., Ltd. Collateralized money invested KRW 250 Nonghyup Bank
Korea Western Power Co., Ltd. Shin Pyeongtaek Power Co., Ltd. Collateralized money invested KRW 144,102 Kookmin Bank and others
Guarantees for supplemental funding (*1)
Korea Western Power Co., Ltd. Haemodum Solar Co., Ltd. Collateralized money invested KRW 3,246 Nonghyup Bank
Korea Western Power Co., Ltd. Muan Solar Park Co., Ltd. Collateralized money invested KRW 6,550 IBK and others
Korea Western Power Co., Ltd. Anjwa Smart Farm & Solar City Co., Ltd. Collateralized money invested KRW 8,397 Hana Bank and others
Korea Western Power Co., Ltd. Seoroseoro Sunny Power Plant Co., Ltd. Collateralized money invested KRW 1,041 Hana Bank and others

149

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

46. Related Parties, Continued
(7) Guarantees provided to the related parties as of March 31, 2025 are as follows, continued:
--- ---
In millions of won and thousands of foreign currencies
--- --- --- --- --- ---
Primary guarantor Principal obligor Type of guarantees Credit limit Creditor
Korea Western Power Co.,<br><br><br>Ltd. YuDang Solar Co., Ltd. Collateralized money invested KRW 566 Hana Bank and others
Guarantees for supplemental funding (*1)
Korea Western Power Co.,<br><br><br>Ltd. Hapcheon Floating Photovoltaic Power Plant Inc. Collateralized money invested KRW 10,967 Nonghyup Bank and others
Korea Western Power Co.,<br><br><br>Ltd. Yeongwol Eco Wind Co., Ltd. Collateralized money invested KRW 1,313 Hana Bank and others
Guarantees for supplemental funding (*1)
Korea Western Power Co.,<br><br><br>Ltd. Gurae Resident Power Co., Ltd. Collateralized money invested KRW 401 Hana Bank and others
Guarantees for supplemental funding (*1)
Korea Western Power Co.,<br><br><br>Ltd. Gunsan Land Solar Co., Ltd. Collateralized money invested KRW 22,348 Hana Bank and others
Korea Western Power Co.,<br><br><br>Ltd. Seobusambo highway photovoltaics Co., Ltd. Collateralized money invested KRW 3,422 Hana Bank and others
Guarantees for supplemental funding (*1)
Korea Western Power Co.,<br><br><br>Ltd. Eumseong Eco Park Co., Ltd. Collateralized money invested KRW 11,342 Kyobo Life Insurance Co., Ltd.<br><br><br>and others
Korea Western Power Co.,<br><br><br>Ltd. PungBack Wind Farm Corporation Collateralized money invested KRW 7,651 Hanwha Life Insurance Co., Ltd. and others
Korea Western Power Co.,<br><br><br>Ltd. Wadi Noor Solar Power Company SAOC Loan payment guarantee USD 54,855 DBS Bank
Korea Western Power Co.,<br><br><br>Ltd. EDFR KOWEPO AJBAN HOLDING LIMITED Loan payment guarantee USD 57,090 FAB
Korea Western Power Co.,<br><br><br>Ltd. Taean Haetdeulwon Solar Co., Ltd. Collateralized money invested KRW 7,992 Kookmin Bank and others
Korea East-West Power Co., Ltd. Seokmun Energy Co., Ltd. Collateralized money invested KRW 14,920 Kookmin Bank and others
Guarantees for supplemental funding (*1)
Korea East-West Power Co., Ltd. Chun-cheon Energy Co., Ltd. Collateralized money invested KRW 37,215 Kookmin Bank and others
Guarantees for supplemental funding (*1) KRW 90,800
Korea East-West Power Co., Ltd. Honam Wind Power Co., Ltd. Collateralized money invested KRW 4,648 Shinhan Bank and others
Korea East-West Power Co., Ltd. GS Donghae Electric Power Co., Ltd. Collateralized money invested KRW 272,350 Korea Development Bank and others
Korea East-West Power Co., Ltd. Yeonggwangbaeksu Wind Power Co., Ltd. Collateralized money invested KRW 3,817 Kookmin Bank and others
Korea East-West Power Co., Ltd. Yeonggwang Wind Power Co., Ltd. Collateralized money invested KRW 27,228 KDB Capital Corporation and others
Korea East-West Power Co., Ltd. Daesan Green Energy Co., Ltd. Collateralized money invested KRW 25,557 IBK
Guarantees for supplemental funding (*1)
Korea East-West Power Co., Ltd. Taebaek Gadeoksan Wind Power Co., Ltd. Collateralized money invested KRW 21,233 Hana Bank and others
Korea East-West Power Co., Ltd. PT. Tanjung Power Indonesia Other guarantees(*16) USD 3,150 PT. Adaro Indonesia
Guarantees for supplemental funding (*1) Sumitomo mitsui banking and others
Collateralized money invested KRW 100,017 MUFG and others
Korea East-West Power Co., Ltd. South Jamaica Power Company Limited Performance guarantees (*14) USD 14,400 Hana Bank
Collateralized money invested KRW 49,791 JCSD Trustee Services Limited and others
Korea East-West Power Co., Ltd. Bitsolar Energy Co., Ltd. Collateralized money invested Mirae Asset Life Insurance Co. Ltd. and others
Korea East-West Power Co., Ltd. Cheongju Eco Park Co., Ltd. Collateralized money invested KRW 10,608 Kyobo Life Insurance Co., Ltd. and others
Korea East-West Power Co., Ltd. Busan Industrial Solar Power Co., Ltd. Collateralized money invested KRW 1,148 Shinhan Bank and others
Korea East-West Power Co., Ltd. Yangyang Wind Power Co., Ltd. Collateralized money invested KRW 14,216 Hana Bank and others
Guarantees for supplemental funding (*1)
Korea East-West Power Co., Ltd. KPE Green Energy Co., Ltd. Collateralized money invested KRW 8,494 Hana Bank and others
Korea East-West Power Co., Ltd. Goheung New Energy Co., Ltd. Collateralized money invested KRW 4,996 Woori Bank and others
Korea East-West Power Co., Ltd. Seokmun Green Energy Collateralized money invested KRW 13,497 Hana Bank and others
Korea East-West Power Co., Ltd. Yanggu Floating Photovoltaic Power Plant Inc. Collateralized money invested KRW 818 Korea Development Bank
Korea East-West Power Co., Ltd. Hoenggye Renewable Energy Co., Ltd. Collateralized money invested KRW 2,375 IBK
Guarantees for supplemental funding (*1)

150

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

46. Related Parties, Continued
(7) Guarantees provided to the related parties as of March 31, 2025 are as follows, continued:
--- ---
In millions of won and thousands of foreign currencies
--- --- --- --- --- ---
Primary guarantor Principal obligor Type of guarantees Credit limit Creditor
Korea East-West Power Co., Ltd. Kumyang Eco Park Co., Ltd. Collateralized money invested KRW 5,461 Woori Bank and others
Guarantees for supplemental funding (*1)
Korea East-West Power Co., Ltd. Amaala Sustaninable Company for<br><br><br>Energy LLC Loan payment guarantee (*7) USD 38,054 FAB
Collateralized money invested KRW 18
Guarantees for supplemental funding (*1)
Korea Southern Power Co., Ltd. Daeryun Power Co., Ltd. Collateralized money invested KRW 32,876 Korea Development Bank and others
Korea Southern Power Co., Ltd. Daegu Green Power Co., Ltd. Collateralized money invested KRW 32,005 Shinhan Bank and others
Performance guarantees
Korea Southern Power Co., Ltd. Kelar S.A. Performance guarantees USD 30,030 Hana Bank, MUFG
Payment guarantees (*12) USD 11,707 Hana Bank
Korea Southern Power Co., Ltd. Daehan Wind Power PSC Performance guarantees USD 1,800 Shinhan Bank
Payment guarantees (*6) USD 2,000 Hana Bank
Collateralized money invested KRW 23,618 Standard Chartered
Korea Southern Power Co., Ltd. Pyeongchang Wind Power Co., Ltd. Collateralized money invested KRW 12,659 Woori Bank, Shinhan Bank and others
Performance guarantees
Korea Southern Power Co., Ltd. Taebaek Guinemi Wind Power Co.,<br><br><br>Ltd. Collateralized money invested KRW 13,559 IBK
Korea Southern Power Co., Ltd. Samcheok Eco Materials Co., Ltd. Payment guarantees (*2) KIS SF the 22nd Co., Ltd.
Performance guarantees (*2) HC elementary materials
Korea Southern Power Co., Ltd. Solaseado Solar Power Co., Ltd. Collateralized money invested KRW 17,603 Kookmin Bank and others
Korea Southern Power Co., Ltd. Naepo Green Energy Co., Ltd. Collateralized money invested KRW 43,954 IBK and others
Performance guarantees and guarantees for supplemental funding (*1)
Korea Southern Power Co., Ltd. Omisan Wind Power Co., Ltd. Collateralized money invested KRW 11,538 Shinhan Bank and others
Performance guarantees and guarantees for supplemental funding (*1)
Korea Southern Power Co., Ltd. Geumsungsan Wind Power Co., Ltd. Collateralized money invested KRW 8,704 Kookmin Bank and others
Korea Southern Power Co., Ltd. HORANG ENERGY Inc. Collateralized money invested KRW 3,685 Woori Bank and others
Guarantees for supplemental funding (*1)
Korea Southern Power Co., Ltd. Haman Green Energy Co., Ltd. Collateralized money invested KRW 2,475 Hana Bank and others
Guarantees for supplemental funding (*1)
Korea Southern Power Co., Ltd. Jeongeup Green Power Co., Ltd. Collateralized money invested KRW 6,673 Mirae Asset Securities Co., Ltd.
Guarantees for supplemental funding (*1)
Korea Southern Power Co., Ltd. HyChangwon Fuel Cell. Co., Ltd. Collateralized money invested KRW 9,138 Woori Bank and others
Guarantees for supplemental funding (*1)
Korea Southern Power Co., Ltd. Roof One Energy Co., Ltd. Collateralized money invested KRW 1,544 Woori Bank
Guarantees for supplemental funding (*1)
Korea Southern Power Co., Ltd. Namjeju Bitdream Energy Co., Ltd. Collateralized money invested KRW 5,325 Woori Bank and others
Guarantees for supplemental funding (*1)
Korea Southern Power Co., Ltd. Cheonwang Green Energy Co., Ltd. Collateralized money invested KRW 652 Samsung Fire & Marine Insurance Co., Ltd. and others
Guarantees for supplemental funding (*1)
Korea Southern Power Co., Ltd. Haetbyeotgil Sunlight Co., Ltd. Collateralized money invested KRW 385 Kyobo Life Insurance Co.,Ltd.
Guarantees for supplemental funding (*1) Heungkuk Asset Management
KOSPO Power Services Ltda. Kelar S.A. Performance guarantees USD 1,348 Scotia bank
KOSPO Chile SpA Kelar S.A. Collateralized money invested KRW 78,060 Export-Import Bank of Korea and others
KOSPO Chile SpA Chester Solar I SpA Collateralized money invested KRW 1,316 IBK
KOSPO Chile SpA Chester Solar IV SpA Collateralized money invested KRW 2,776 IBK
KOSPO Chile SpA Chester Solar V SpA Collateralized money invested KRW 634 IBK
KOSPO Chile SpA Diego de Almagro Solar SpA Collateralized money invested KRW 2,902 IBK
KOSPO Chile SpA Laurel SpA Collateralized money invested KRW 2,156 IBK
Korea Midland Power Co., Ltd. YeongGwang Yaksu Wind Electric Co., Ltd. Collateralized money invested KRW 100 IBK and others
Korea Midland Power Co., Ltd. Hyundai Green Power Co., Ltd. Collateralized money invested KRW 84,365 Korea Development Bank and others
Korea Midland Power Co., Ltd. PT. Cirebon Electric Power Debt guarantees USD 4,510 Mizuho Bank
Korea Midland Power Co., Ltd. PT Wampu Electric Power Debt guarantees USD 4,716 PT. Bank KB Bukopin
Korea Midland Power Co., Ltd. PT. Cirebon Energi Prasarana Debt guarantees USD 9,290 Mizuho Bank
Korea Midland Power Co., Ltd. Green Energy Electricity Generation Co., Ltd. Collateralized money invested KRW 793 IBK
Guarantees for supplemental funding (*1)
Korea Midland Power Co., Ltd. Yaksu ESS Co., Ltd. Collateralized money invested KRW 171 IBK
Korea Midland Power Co., Ltd. Gwangbaek Solar Power Investment Co., Ltd. Collateralized money invested KRW 5,180 Kyobo Life Insurance Co., Ltd. and others
Korea Midland Power Co., Ltd. Muan Sunshine Solar Power Plant Co., Ltd. Collateralized money invested KRW 2,234 IBK
Korea Midland Power Co., Ltd. Goesan Solar park Co., Ltd. Collateralized money invested KRW 2,676 IBK

151

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

46. Related Parties, Continued
(7) Guarantees provided to the related parties as of March 31, 2025 are as follows, continued:
--- ---
In millions of won and thousands of foreign currencies
--- --- --- --- --- ---
Primary guarantor Principal obligor Type of guarantees Credit limit Creditor
Korea Midland Power Co.,<br><br><br>Ltd. Bitgoel Eco Energy Co., Ltd. Collateralized money invested KRW 7,569 IBK and others
Guarantees for supplemental funding (*1)
Korea Midland Power Co.,<br><br><br>Ltd. Energyco Co., Ltd. Collateralized money invested KRW 2,249 Nonghyup Bank
Korea Midland Power Co.,<br><br><br>Ltd. Jeju Gimnyeong Wind Power Co., Ltd. Collateralized money invested KRW 676 Nonghyup Bank
Korea Midland Power Co.,<br><br><br>Ltd. Dongbu Highway Solar Co., Ltd. Collateralized money invested KRW 520 Shinhan Bank
Korea Midland Power Co.,<br><br><br>Ltd. Seobu Highway Solar Co., Ltd. Collateralized money invested KRW 590 Shinhan Bank
Korea Midland Power Co.,<br><br><br>Ltd. Yeongyang Wind Power Corporation II Collateralized money invested KRW 12,236 Korea Development Bank<br><br><br>and others
Korea Midland Power Co.,<br><br><br>Ltd. Haeparang Energy Co., Ltd. Collateralized money invested KRW 3,084 Templeton Hana Asset
Guarantees for supplemental funding (*1) Management Co., Ltd.
Korea Midland Power Co.,<br><br><br>Ltd. Saemangeum Sebit Power Plant Co., Ltd. Collateralized money invested KRW 27,784 IBK and others
Korea Midland Power Co.,<br><br><br>Ltd. Yeomsubong Wind Power Co., Ltd. Collateralized money invested KRW 488 Korea Development Bank
Guarantees for supplemental funding (*1)
Korea South-East Power<br><br><br>Co., Ltd. Boim Combined Heat and Power Generation Co., Ltd. Collateralized money invested (*3) IBK
Guarantees for supplemental funding and others (*1,4) KRW 76,800 NH Investment & Securities Co., Ltd. and others
Korea South-East Power<br><br><br>Co., Ltd. RES Technology AD Collateralized money invested KRW 15,718 UniCredit Bulbank and<br><br><br>others
Korea South-East Power<br><br><br>Co., Ltd. ASM-BG Investicii AD Collateralized money invested KRW 17,949 UniCredit Bulbank and<br><br><br>others
Korea South-East Power<br><br><br>Co., Ltd. Goseong Green Power Co., Ltd. Collateralized money invested KRW 288,387 Kyobo Life Insurance Co.,<br><br><br>Ltd. and others
Korea South-East Power<br><br><br>Co., Ltd. Gangneung Eco Power Co., Ltd. Collateralized money invested KRW 237,846 Kyobo Life Insurance Co.,<br><br><br>Ltd. and others
Korea South-East Power<br><br><br>Co., Ltd. PND Solar Co., Ltd. Collateralized money invested KRW 1,731 IBK
Korea South-East Power<br><br><br>Co., Ltd. Hyundai Eco Energy Co., Ltd. Collateralized money invested KRW 8,038 Samsung Life Insurance and others
Korea South-East Power<br><br><br>Co., Ltd. Jaeun Resident Wind Power Plant Co., Ltd. Collateralized money invested KRW 756 IBK
Korea South-East Power<br><br><br>Co., Ltd. Chungsongmeon BongSan wind power Co., Ltd. Collateralized money invested KRW 2,486 Kyobo Life Insurance Co.,<br><br><br>Ltd. and others
Korea South-East Power<br><br><br>Co., Ltd. Yeongam Solar Power Co., Ltd. Collateralized money invested KRW 11,318 Kookmin Bank and others
Korea South-East Power<br><br><br>Co., Ltd. Samsu Wind Power Co., Ltd. Collateralized money invested KRW 3,064 Shinhan Bank and others
Korea South-East Power<br><br><br>Co., Ltd. Saemangeum Heemang Photovoltaic Co., Ltd. Collateralized money invested KRW 16,538 Woori Bank and others
Korea South-East Power<br><br><br>Co., Ltd. Nepal Water & Energy Development Company Private Limited Collateralized money invested USD 97,105 International Finance
Business reserve payment guarantee USD 33,333 Corporation and others
Korea South-East Power<br><br><br>Co., Ltd. Santiago Solar Power SpA Debt guarantees (*8) USD 8,000 Nonghyup Bank and others
Korea Hydro & Nuclear<br><br><br>Power Co., Ltd. Noeul Green Energy Co., Ltd. Collateralized money invested Hana Bank and others
Korea Hydro & Nuclear<br><br><br>Power Co., Ltd. Busan Green Energy Co., Ltd. Collateralized money invested KRW 2,138 Shinhan Bank and others
Korea Hydro & Nuclear<br><br><br>Power Co., Ltd. Go deok Clean Energy Co., Ltd. Collateralized money invested KRW 6,254 Kookmin Bank and others
Korea Hydro & Nuclear<br><br><br>Power Co., Ltd. Cheong-Song Noraesan Wind Power Co., Ltd. Collateralized money invested KRW 3,963 Woori Bank and others
Korea Hydro & Nuclear<br><br><br>Power Co., Ltd. Gwangyang Green Energy Co., Ltd. Collateralized money invested KRW 24,150 Shinhan Bank and others
Korea Hydro & Nuclear Power Co., Ltd. Gangneung Sacheon Fuel Cell Co., Ltd. Collateralized money invested KRW 9,252 Hana Bank and others
Korea Hydro & Nuclear Power Co., Ltd. Chuncheon Green Energy Co., Ltd. Collateralized money invested KRW 16,207 Hana Bank and others
Guarantees for supplemental funding (*1)

152

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

46. Related Parties, Continued
(7) Guarantees provided to the related parties as of March 31, 2025 are as follows, continued:
--- ---
In millions of won and thousands of foreign currencies
--- --- --- --- --- ---
Primary guarantor Principal obligor Type of guarantees Credit limit Creditor
Korea Hydro & Nuclear Power Co., Ltd. Yangyang Suri Wind Power Co., Ltd. Collateralized money invested KRW 9,723 Kookmin Bank and others
Korea Hydro & Nuclear Power Co., Ltd. Bigeum Resident Photovoltaic Power Co., Ltd. Collateralized money invested KRW 6,907 Kookmin Bank and others
Korea Hydro & Nuclear Power Co., Ltd. Songsan Green Energy Co., Ltd. Collateralized money invested KRW 7,257 Hana Bank
Korea Hydro & Nuclear Power Co., Ltd. Changwon Nu-ri Energy Co., Ltd. Collateralized money invested KRW 7,509 Hana Bank
Korea Hydro & Nuclear Power Co., Ltd. Imha Floating Photovoltaic Power Plant Inc. Collateralized money invested KRW 6,332 Hana Bank
Korea Hydro & Nuclear Power Co., Ltd. KAS INVESTMENT I LLC Payment guarantees (*13) USD 9,770 WOORI AMERICA BANK
Korea Hydro & Nuclear Power Co., Ltd. KAS INVESTMENT II LLC Payment guarantees (*13) USD 9,730 WOORI AMERICA BANK
(*1) The Group guarantees to provide supplemental funding for business with respect to excessive business expenses<br>or insufficient repayment of borrowings.
--- ---
(*2) Samcheok Eco Materials Co., Ltd., an associate of the Group has issued the hybrid bonds. If the bonds are not<br>repaid by December 8, 2026, the parent company and shareholders except the parent company must purchase the bonds from the acquirer. As of March 31, 2025, derivative liabilities of ~~W~~26,422 million were recognized in<br>relation to this obligation. Meanwhile, the Group has entered into an agreement to compensate for potential losses in connection with the fulfillment of the obligated supply volume under the coal ash supply obligation agreement.<br>
--- ---
(*3) The Group recognized an impairment loss on all of the equity securities of Boim Combined Heat and Power<br>Generation Co., Ltd. before the prior year, and the acquisition cost of the securities provided as collateral is ~~W~~47,067 million.
--- ---
(*4) Pursuant to the guarantee agreement, the Group recognized other provisions of ~~W~~11,379 million<br>as the possibility of economic benefit outflow to fulfill the obligation was deemed probable and the amount could be reasonably estimated.
--- ---
(*5) The common stocks of Dongducheon Dream Power Co., Ltd. held by the Group were pledged as collateral.<br>
--- ---
(*6) The Group provided a payment guarantee to Jordan Tafila wind power project for opening L/C for Debt Service<br>Reserve Account (DSRA).
--- ---
(*7) The Group provided EBL payment and EBL hedging guarantee to Amaala Sustainable Company for Energy LLC, an<br>associate of the Group.
--- ---
(*8) The Group has issued a guaranteed letter of credit in the amount of USD 8,000 thousand under the<br>interlender loan agreement with Santiago Solar Power SpA.
--- ---
(*9) The credit limits of guarantees to RE Holiday Holdings LLC include the credit limits of guarantees to their<br>subsidiaries..
--- ---
(*10) The Group, together with other shareholders, has provided a guarantee for the project financing of Pulau Indah<br>Power Plant Sdn. Bhd., by establishing the right of pledge on the shares of Pulau Indah Power Plant Sdn. Bhd. The Group has pledged a portion of its shares in Pulau Indah Power Plant Sdn. Bhd., with a book value of ~~W~~<br>25,350 million, as collateral.
--- ---
(*11) Xe-Pian Xe-Namnoy Power Co., Ltd., an associate of the Group, has entered a contract to pay an incentive type<br>of impounding bonus to SK Eco Plant Co., Ltd. when the Xe-Pian Xe-Namnoy Dam is completed. If Xe-Pian Xe-Namnoy Power Co., Ltd. fails to pay SK Eco Plant Co., Ltd., the Group guarantees the payment, and the amount is USD 5,000 thousand.<br>
--- ---
(*12) The Group provided a payment guarantee to Chile Kelar project for opening L/C for Debt Service Reserve Account<br>(DSRA), and others.
--- ---
(*13) The credit limits of guarantees to KAS INVESTMENT I LLC, KAS INVESTMENT II LLC include the credit limits of<br>guarantees to their subsidiaries.
--- ---
(*14) The payment guarantee related to the gas combined cycle power project of South Jamaica Power Company Limited, a<br>joint venture of the Group.
--- ---
(*15) The guarantee limits of Remal First Holding Company and Naseem First Holding Company include the guarantee<br>limits provided for subsidiaries of associates.
--- ---
(*16) The payment guarantee for the water source modification cost of PT. Tanjung Power Indonesia, a joint venture of<br>the Group, has not yet been executed.
--- ---

153

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

46. Related Parties, Continued
(8) Guarantees received from the related parties as of March 31, 2025 are as follows:
--- ---
In millions of won
--- --- --- ---
Primary Guarantor Type of guarantees Credit limit
KAPES, Inc. Defect guarantees ~~W~~ 16,160
Performance guarantees 38,231
Advance payment guarantee 248,042
Certification of bidding 79,818
(9) Derivatives transactions with the related parties as of March 31, 2025 are as follows:
--- ---

(i) Currency Swap

In millions of won and thousands of foreign currencies except contract exchange rate information
Counterparty Contract year Contract amounts Contract interest rate<br>per annum Contractexchangerate (in won)
Pay Receive Receive
Korea Development Bank 2020~2025 ~~W~~ 241,320 200,000 0.54 % 1.13 % ~~W~~ 1,206.60
2021~2026 118,170 100,000 1.11 % 1.13 % 1,181.70
2022~2026 283,820 200,000 4.67 % 5.38 % 1,419.10
2022~2028 283,820 200,000 5.12 % 5.50 % 1,419.10
2023~2026 256,000 200,000 4.04 % 5.38 % 1,280.00
2024~2027 864,890 650,000 3.53 % 4.88 % 1,330.60
2015~2025 111,190 100,000 2.62 % 3.25 % 1,111.90
2017~2027 111,610 100,000 2.31 % 3.13 % 1,116.10
2018~2028 108,600 HKD 800,000 2.69 % 3.35 % 135.75
2019~2027 119,978 CHF 100,000 1.43 % 0.05 % 1,199.78
2021~2026 111,400 100,000 0.93 % 1.25 % 1,114.00
2022~2027 262,000 200,000 3.63 % 4.25 % 1,310.00
2024~2028 257,880 200,000 3.80 % 5.00 % 1,289.40
2024~2028 128,940 100,000 3.69 % 5.00 % 1,289.40
2024~2029 138,540 100,000 3.19 % 4.63 % 1,385.40
2020~2026 118,910 100,000 0.61 % 1.00 % 1,189.10
2021~2026 114,230 100,000 1.27 % 1.25 % 1,142.30
2022~2027 123,710 100,000 3.41 % 3.63 % 1,237.10
2022~2025 128,560 100,000 3.37 % 4.13 % 1,285.60
2020~2025 122,780 100,000 0.93 % 1.75 % 1,227.80
2022~2025 252,360 200,000 2.83 % 3.60 % 1,261.80
2023~2028 129,500 100,000 3.85 % 4.88 % 1,295.00

All values are in US Dollars.

154

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

46. Related Parties, Continued
(10) The Group considers all standing directors of the Board who serve as executive officers responsible forplanning, operations and/or control of business activities, as key management personnel. The Group recorded salaries and other compensations related to the key management personnel as follows:
--- ---
In millions of won<br><br><br>Type For the three-month periodEnded March 31, 2025 For the three-month period<br>Ended March 31, 2024
--- --- --- --- ---
Salaries ~~W~~ 233 221
Retirement benefits 17 2
~~W~~ 250 223

155

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

47. Statement of Cash Flows
(1) Significant non-cash transactions for the three-month periods ended March 31, 2025 and 2024 are asfollows:
--- ---
In millions of won<br><br><br>Transactions For the three-monthperiod ended March31, 2025 For the three-monthperiod ended March 31,2024
--- --- --- --- ---
Transfer from construction-in-progress to other assets ~~W~~ 1,452,988 1,553,498
Recognition of asset retirement cost and related provision for decommissioning costs 66,315 198,945
Transfer from provision for disposal of used nuclear fuel to accrued expenses 75,812 243,424
Transfer from long-term borrowings and debt securities to current portion of long-term borrowings<br>and debt securities 7,292,155 8,009,938
Transfer from inventory to stored nuclear fuel 358,876 391,967
Recognition of right-of-use assets and others 30,693 31,841
(2) Changes in liabilities incurred from financing activities for the three-month periods ended March 31,2025 and 2024 are as follows:
--- ---
In millions of won For the three-month period ended March 31, 2025
--- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Non-cash changes
Beginningbalance Cash flows Increase Effect ofexchange rate<br>fluctuationsand others Endingbalance
Borrowings ~~W~~ 20,659,381 206,872 (29,661 ) 20,836,592
Debt securities 111,874,019 538,688 (14,350 ) 112,398,357
Lease liabilities 3,699,456 (188,632 ) 26,324 15,246 3,552,394
Dividends Payable 5,063 211,047 216,110
Derivative liabilities (assets), net (2,406,338 ) 46,860 (11,278 ) (2,370,756 )
~~W~~ 133,831,581 603,788 26,324 171,004 134,632,697
In millions of won For the three-month period ended March 31, 2024
Non-cash changes
Beginningbalance Cash flows Increase Effect ofexchange rate<br>fluctuationsand others Endingbalance
Borrowings ~~W~~ 19,839,652 (3,739,385 ) 69,631 16,169,898
Debt securities 113,792,178 (211,266 ) 682,076 114,262,988
Lease liabilities 3,807,880 (184,957 ) 41,443 111,645 3,776,011
Dividends Payable 4,574 57,937 62,511
Derivative liabilities (assets), net (554,147 ) 106,862 (707,476 ) (1,154,761 )
~~W~~ 136,890,137 (4,028,746 ) 41,443 213,813 133,116,647

156

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

48. Commitments for Expenditure
(1) The commitments for acquisition of property, plant and equipment as of March 31, 2025 andDecember 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- --- --- --- --- ---
Contracts Commitmentamounts Remaining<br>liability balances Commitmentamounts Remaining liabilitybalances
Purchase of cable (PVC, 1C, 2000SQ) 153,000M and others (Shin-Bupyung-Youngseo) ~~W~~ 57,226 417 57,226 417
Purchase of GIS (362kV, 6300A, 63kA) 23CB – Youngseo S/S 37,168 11,751 37,168 15,109
Purchase of GIS (362kV, 6300A, 63kA) 27CB – Kwangyang S/S 37,744 140 37,744 140
Purchase of cable (PVC, 1C, 2500SQ) 100,548M and others (Kyungin Construction) 58,271 746 58,271 746
Purchase of GIS (362kV, 6300A, 63kA) 25CB – Migeum S/S 35,282 10,351 35,282 13,476
Purchase of cable (PVC, 1C, 2000SQ) 5,862M and others (Baekun-Gwangyanghang) 35,016 703 35,016 703
Purchase of cable (PVC, 1C, 2500SQ) 57,868M and others (Goduk-Seoansung) 40,937 654 40,937 654
Purchase of cable (PVC, 1C, 2000SQ) 87,732M and others (Eulwangboonki) 36,446 1,015 36,446 1,015
Purchase of GIS (362kV,6300A,63kA) Type 18 – Wolsung S/Y 33,057 16,045 33,057 16,045
System stabilization ESS equipment (Bubuk S/S) Type 1 221,939 42,137 221,939 42,137
System stabilization ESS equipment (Yeongcheon S/S) Type 1 72,779 16,975 72,779 16,975
System stabilization ESS equipment (Yesan S/S) Type 1 56,174 11,471 56,174 11,471
System stabilization ESS equipment (Hamyang S/S) Type 1 35,764 11,468 35,764 11,468
Concrete pole (10M, general purpose, 500KGF) 90,000 ea and four other equipment 39,091 22,801 59,473 36,464
Purchase of cable (PVC, 1C, 2500SQ) 53,856M and others (Shinchungjuboonki) 31,925 31,925 7,756
Purchase of GIS (362kV, 6300A, 63kA) Type 31 – East Seoul S/S 39,060 39,060 39,060 39,060
Purchase of cable (PVC, 1C, 2000SQ) 68,613M and others (Dongducheon-Yangju) 40,933 28,790 40,933 28,790
Purchase of HVDC cable (PE, 2500SQ) 31,551M and others 40,323 40,323 40,323 40,323
Purchase of HVDC cable (PE, 2500SQ) 30,883M and others 40,130 40,130 40,130 40,130
Stationary reactive power compensation device (Phase 3, ±500MVAR) – Shin Jecheon<br>S/S 39,300 39,300 39,300 39,300
Stationary reactive power compensation device (STATCOM, phase 3, ±500MVAR) – East<br>coast #1C/S 37,600 37,600 37,600 37,600
AMIGO, 1P2W, 60(5)A, Electronic, Class 1.0, 220V, 1,031,728 EA - Annual Unit Price 43,054 19,805 43,054 38,404
Stationary reactive power compensation device (STATCOM/Phase 3, ±500MVAR) – Shin<br>Gapyeong S/S 40,590 40,590 40,590 40,590
Stationary reactive power compensation device (STATCOM/Phase 3, ±500MVAR) – Shin<br>Namwon S/S 37,100 37,100 37,100 37,100
Purchase of GIS (362kV, 6300A, 63kA) Type 16 and others -East coast #1C/S 41,000 41,000
Purchase of cable (PVC, 1C, 2500SQ) 55,593M and others (Shin Anseong–Dong Yongin) 37,416 37,416
Concrete pole (10M, general purpose, 500KGF) 70,000 ea and five other equipment 32,659 31,912
Construction of Saeul Units (#3,4) 11,718,217 1,432,970 11,718,217 1,748,342

157

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

48. Commitments for Expenditure, Continued
(1) The commitments for acquisition of property, plant and equipment as of March 31, 2025 andDecember 31, 2024 are as follows, continued:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- --- --- --- --- ---
Contracts Commitmentamounts Remaining<br>liability balances Commitmentamounts Remaining liabilitybalances
Construction of Shin-Hanul Units (#3,4) ~~W~~ 12,343,245 10,661,592 12,343,245 10,964,638
Other 43 contracts 2,437,963 1,918,453 2,033,913 1,744,217
Purchase of equipment for the construction project of Boryeong indoor coal storage yard 360,093 202,807 357,479 241,751
Purchase of main machine for Boryeong New Complex Unit 1 286,299 171,518 286,299 177,988
Boryeong New Complex Unit 1 Construction Project 208,457 122,220 202,552 161,753
Haman Combined Power Block Conditional Purchase Agreement 581,790 543,509 581,790 543,509
Purchase of gas turbine and turbine equipment of Gimpo combined heat & power<br>plant 123,495 15,603 123,495 15,603
Purchase of steam turbine, HRSG and POWER BLOCK of Gimpo combined heat & power<br>plant 220,864 101
Construction of Gimpo combined heat & power plant 223,697 7,184 223,660 8,795
Purchase of gas turbines, steam turbines, and accessories for Gumi natural gas power<br>plant 198,029 18,973 198,029 29,417
Purchase of heat recovery boiler and accessories for Gumi natural gas power plant 65,918 9,336 65,918 12,574
Construction of Gumi natural gas power plant 247,053 62,268 246,110 96,708
Installation of natural gas supply facility at Gumi natural gas power plant 83,801 19,469 83,801 45,019
Construction of Gongju natural gas power plant 203,849 172,618 203,849 190,840
Purchase of natural gas main machine and accessories at Gongju natural gas power plant 310,322 257,822 305,829 273,338
Purchase of main equipment and ancillary facilities for the Yeosu Natural Gas Power<br>Plant. 288,250 232,221
Purchase of coal handling machine for construction of Samcheok Units (#1,2) 360,325 5,679 326,395 5,905
Purchase of main equipment for Shin-Sejong combined thermal power plant 234,392 2,595 234,392 2,670
Purchase of Samcheok hydrogen compound co-firing facility infrastructure 128,820 87,668 128,820 90,876
Construction of Andong Combined Unit 2 Power Plant 181,593 173,565 181,593 175,029
Purchase of main equipment for Andong Combined Unit 2 279,773 230,538 279,773 230,694
Service of designing Hadong Combined Unit 1 31,593 26,351 31,593 26,351

158

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

48. Commitments for Expenditure, Continued
(2) As of March 31, 2025, details of contracts for inventory purchase commitment are as follows:
--- ---
Type Periods Contracted quantity
--- --- --- ---
Concentrate 2025 ~ 2033 20,737 Ton U3O8
Conversion 2025 ~ 2030 17,392 Ton U
Enrichment 2025 ~ 2035 27,829 Ton SWU

In addition, the contracted quantity of the molded uranium between Korea Hydro & Nuclear Power Co., Ltd. and KEPCO Nuclear Fuel Co., Ltd., which are subsidiaries of the Group, is 1,370 Ton U (contract periods: 2024 ~ 2033).

159

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

49. Contingencies and Commitments
(1) Ongoing litigations and arbitrations related with contingent liabilities and contingent assets as ofMarch 31, 2025 and December 31, 2024 are as follows:
--- ---
In millions of won As of March 31, 2025 As of December 31, 2024
--- --- --- --- --- --- --- --- ---
Number of cases Amount Number of cases Amount
As the defendant 735 ~~W~~ 992,665 722 ~~W~~ 884,402
As the plaintiff 260 947,126 264 769,772

As of March 31, 2025, there are 3 ongoing litigations and 1 arbitration case between consolidated entities.

1) The Group is the defendant against a number of litigations. The following is ongoing litigation pertaining to<br>the Group which can potentially be significant:

There are multiple ongoing litigations against the Group related to ordinary wages, requesting payment of unpaid wages. The Group believes that the possibility of the outflow of economic benefits is probable on the ongoing and the expected litigations. Accordingly, the Group recognized ~~W~~340,637 million as litigation provisions in relation to the litigation as of March 31, 2025.

2) There are 15 arbitration cases pertaining to the Group as of March 31, 2025 and the significant<br>arbitration cases are as follows:
i) During the three-month period ended March 31, 2025, UniTest Co., Ltd. filed an arbitration claim against<br>KEPCO for delay damages arising from the modification of design and contract amount related to the 154kV Yesan S/S 82MW ESS construction project. The amount and timing of resource outflows resulted therefrom cannot be reasonably estimated.<br>
--- ---
ii) Samsung C&T consortium (Samsung C&T Co., Ltd., Doosan Enerbility Co., Ltd., and Hanwha Co., Ltd.) filed<br>an arbitration application against the Group to National Contract Dispute Mediation Committee regarding the adjustment of the contract amount related to the main facility construction of Saeul Units 3 and 4 (formerly, Shin-Kori Nuclear Power Units 5<br>and 6). The Group has not recognized any provision because the amount and timing of economic benefit outflow cannot be reasonably estimated as of March 31, 2025
--- ---

160

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

49. Contingencies and Commitments, Continued
(2) Guarantees of payments and commitments provided to other companies as of March 31, 2025 are as follows:
--- ---
1) The Group has provided the syndicate of lenders of PT Indo Raya Tenaga, the business corporation of PT Barito<br>Wahana Tenaga, a guarantee by establishing the right of pledge on the shares of PT Barito Wahana Tenaga for project financing of PT Barito Wahana Tenaga as of March 31, 2025.
--- ---
2) The Group has outstanding borrowings with a limit of USD 264,800 thousand from its creditors such as<br>International Finance Corporation. Regarding the borrowing contract, the Group has guaranteed capital contribution of USD 69,808 thousand and additional contribution up to USD 19,000 thousand for contingencies, if any. In relation to this<br>financial agreement, the Group is providing its entire shares in Mira Power Limited and business-related PP&E as collateral to the lenders.
--- ---
3) The Group has provided USD 6,119 thousand for a debt guarantee to Export-Import Bank of Korea, BNP Paribas<br>and ING Bank, to guarantee the payment of debt related to hydroelectric power business of Tanggamus, Indonesia.
--- ---
4) The Group has provided USD 4,716 thousand for a debt guarantee to PT. Bank KB Bukopin, to guarantee the<br>payment of debt related to hydroelectric power business of Wampu, Indonesia.
--- ---
5) The Group has provided RBC Community Investments Impact Renewables HoldCo-1, LLC a performance guarantee<br>regarding weatherization in relation with tax investors up to USD 3,000 thousand for the of the power plant construction for Concho Valley solar power project in the United States.
--- ---
6) The Group has provided EUR 7,031 thousand for a performance guarantee to Microsoft through Kookmin Bank,<br>to guarantee the implementation of the power plant construction for Guba Buget wind power project in Sweden.
--- ---
7) The Group has provided Axia Power Holdings B.V. and others a performance guarantee up to USD<br>54,000 thousand for the implementation of Cirebon thermal power generation project in Indonesia.
--- ---
8) The Group has provided Nonghyup Bank a debt guarantee up to USD 4,510 thousand to guarantee Debt Service<br>Reserve Account (DSRA) for Mizuho bank, related to the Cirebon power plant business of PT. Cirebon Electric Power in Indonesia.
--- ---
9) The Group has provided Nonghyup Bank a debt guarantee up to USD 9,290 thousand to guarantee Debt Service<br>Reserve Account (DSRA) for Mizuho bank, related to the Cirebon power plant business of PT. Cirebon Energi Prasarana in Indonesia.
--- ---
10) The Group has provided PT Perusahaan Listrik Negara a performance guarantee up to IDR 35,588,165 thousand<br>for the implementation of Tanjung Jati power plant operation project in Indonesia.
--- ---
11) The Group has provided USD 30,000 thousand for a performance guarantee to Morgan Stanley Capital Group<br>Inc., to guarantee the electricity purchase contract in relation to photovoltaic power generation project in USA.
--- ---
12) The Group has provided Morgan Stanley Renewables Inc. a guarantee up to USD 70,000 thousand for the<br>fulfillment of subscription obligation regarding photovoltaic power generation project in USA.
--- ---
13) The Group has provided Kookmin Bank a debt guarantee up to USD 40,000 thousand to guarantee Equity Bridge<br>Loan for Concho Valley solar business in the United States.
--- ---
14) The Group has provided Van Phong Power Company, Ltd. a performance guarantee up to USD 5,000 thousand for<br>the operation maintenance project in Van Phong, Vietnam.
--- ---
15) The Group has provided RBC Community Investments Impact Renewables HoldCo-1, LLC a guarantee for up to USD<br>62,800 thousand for the fulfillment of subscription obligation regarding Concho Valley solar power project in the United States.
--- ---
16) The Group has provided PT Perusahaan Listrik Negara a performance guarantee up to USD 2,280 thousand for<br>the operation maintenance project in Indonesia siborpa.
--- ---
17) The Group has provided joint guarantee for ~~W~~1,641 million guarantee insurance contracted by<br>Haetbyeotgil Sunlight Co., Ltd.
--- ---

161

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

49. Contingencies and Commitments, Continued
(3) Credit lines provided by financial institutions and others as of March 31, 2025 are as follows:<br>
--- ---
In millions of won and thousands of foreign currencies
--- --- --- ---
Commitments Financial institutions Currency
Commitments on Bank-overdraft Nonghyup Bank and others KRW 2,220,500
Limit amount available for CP Hana Bank and others KRW 7,950,000
General Loan, etc. Kookmin Bank and others KRW 3,900,000
Limit amount available for card Nonghyup Card and others KRW 48,158
Loan limit Korea Development Bank and others KRW 3,506,280
DBS Bank and others 1,086,000
Certification of payment on payables from foreign country Nonghyup Bank 8,700
Certification of payment on L/C Shinhan Bank and others 1,186,844
Kookmin Bank and others 39,066
Shinhan Bank 715,837
Certification of Performance guarantee on contract Hana Bank and others KRW 124,732
First Abu Dhabi Bank and others 1,005,259
SMTB 6,500,000
Hana Bank and others 63,642
Hana Bank 27,117
Hana Bank OMR 6,250
First Abu Dhabi Bank and others AED 53,489
Saudi National Bank and others SAR 124,151
Certification of bidding Korea Software Financial Cooperative KRW 42,874
Hana Bank and others 10,200
Shinhan Bank QAR 155,213
First Abu Dhabi Bank OMR 2,500
Advance payment bond, Warranty bond, Retention bond and others Seoul Guarantee Insurance KRW 77,186
Hana Bank and others 707,339
Saudi National Bank SAR 32,500
Hana Bank and others MXN 21,290
Others (*) Nonghyup Bank and others KRW 395,558
Nonghyup Bank and others 411,971
Standard Chartered AED 50
Secured loan of credit sales<br><br><br>Inclusive credit Nonghyup Bank and others KRW 234,500
Hana Bank KRW 8,000
Hana Bank and others 35,000
Equity Bridge Loan Guarantee Export-Import Bank of Korea and others 834,772
Trade finance DBS Bank and others 600,000

All values are in US Dollars.

(*) As of March 31, 2025, the Group has entered into a credit extension agreement for derivatives transactions<br>with Nonghyup Bank, Hana Bank and Woori Bank as ancillary to currency swap transactions.

162

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

49. Contingencies and Commitments, Continued
(4) As of March 31, 2025, promissory notes and assets provided as collaterals or pledges to financialinstitutions by the Group are as follows:
--- ---
In millions of won and thousands of foreign currencies
--- --- --- --- --- ---
Obligor Creditor Assets provided as security (*2) Currency Description
Mira Power Limited International Finance Corporation and others Property, plant and Equipment and others 264,800 Collateral for borrowings<br><br><br>(*1)
Tamra Offshore Wind Power Co., Ltd. Kyobo Life Insurance Co., Ltd. and others Property, plant and equipment and others KRW 132,000 Collateral for borrowings<br><br><br>(*1)
Gyeonggi Green Energy Co., Ltd. Korea Development Bank and others Cash and cash equivalents and others KRW 251,600 Collateral for borrowings<br><br><br>(*1)
Commerce and Industry Energy Co., Ltd. IBK and others Property, plant and equipment and others KRW 94,254 Collateral for borrowings
Jeongam Wind Power Co., Ltd. KDB Capital Corporation and others Cash and cash equivalents and others KRW 231,250 Collateral for borrowings
Gyeongju Wind Power Co., Ltd. Shinhan Bank and others Property, plant and equipment and others KRW 68,400 Collateral for borrowings
Korea Offshore Wind Power Co., Ltd. Woori Bank and others Property, plant and equipment and others KRW 244,500 Collateral for borrowings<br><br><br>(*1)
Qatrana Electric Power Company The Islamic Development Bank and others Finance lease receivable and property, plant and equipment and others JOD 62,325 Collateral for borrowings<br><br><br>(*1)
KST Electric Power Company, S.A.P.I. de C.V. Export–Import Bank of Korea and others Finance lease receivable and property, plant and equipment and others 326,929 Collateral for debt securities (*1)
Incheon Fuel Cell Co., Ltd. Kookmin Bank and others Cash and cash equivalents and others KRW 230,800 Collateral for borrowings<br><br><br>(*1)
K-SOLAR SHINAN Co., Ltd. Kyobo Life Insurance Co., Ltd. and others Property, plant and equipment and others KRW 274,780 Collateral for borrowings<br><br><br>(*1)
KOSPO Youngnam Power Co., Ltd. Shinhan Bank and others Cash and cash equivalents and others KRW 744,120 Collateral for borrowings
Jeju Hanlim Offshore Wind Co., Ltd. Kookmin Bank and others Property, plant and equipment and others KRW 11,932 Collateral for borrowings
Western Power Changgi Solar Co., Ltd. Samsung Life Insurance and others Property, plant and equipment and others KRW 45,000 Collateral for borrowings<br><br><br>(*1)
Yeongdeok Sunrise Wind Power Co., Ltd. Korea Development Bank and others Property, plant and equipment and others KRW 96,240 Collateral for borrowings
J Wind First, LLC Woori Bank Trade receivable and others KRW 65,083 Collateral for borrowings
Chitose Solar Power Plant LLC SMTB Property, plant and equipment and others 126,861 Collateral for borrowings<br><br><br>(*1)
Mangilao Intermediate Holdings LLC Mizuho Bank Trade receivable and others 93,392 Collateral for borrowings<br><br><br>(*1)

All values are in US Dollars.

163

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

49. Contingencies and Commitments, Continued
(4) As of March 31, 2025, promissory notes and assets provided as collaterals or pledges to financialinstitutions by the Group are as follows, continued:
--- ---
(*1) This is based on the amount of loan commitment limit.
--- ---
(*2) As of March 31, 2025, the Group has established guarantees for pledge for transfer of rights of long-term<br>borrowings, pledge for insurance claims, pledge for shares, etc.
--- ---

The Group has ~~W~~1,197 million of project loans from the Korea Energy Agency as of March 31, 2025. The Group has provided a promissory note as a repayment guarantee.

(5) The Group temporarily suspended operations of the Gangneung hydroelectric generating plant, with a<br>carrying amount of ~~W~~58,409 million as of March 31, 2025, to improve the quality of water used in generating electricity. The expenses related to the suspension of operations of ~~W~~196 million and depreciation on<br>the idle assets of ~~W~~904 million are recorded in other expenses for the three-month period ended March 31, 2025. Regarding the improvement of water quality, the results of damages compensation for the local residents cannot be<br>reasonably estimated, and the Group is in negotiations with Gangneung City and related stakeholders to restart the Gangneung hydroelectric generating plant as of March 31, 2025.
(6) As the government of the Republic of Korea announced the suspension of operation in Gaeseong Industrial<br>District, it is uncertain if the Group can exercise the property rights for the Group’s facility in Gaeseong Industrial District as of March 31, 2025. Accordingly, the book value of the facility, amounting to ~~W~~11,778<br>million, was recognized as an impairment loss, and trade receivables related to companies residing in the Gaeseong Industrial District were fully written off. As of March 31, 2025, the Group cannot make reasonable estimation on whether assets<br>will be recovered or utilized in regular way related thereto.
--- ---
(7) As of March 31, 2025, the Group owns land at 6171-1 Nuri-ri, Yeongi-myeon, Sejong Special Self-Governing<br>City as PP&E with limited ownership, and its book value is ~~W~~64,371 million.
--- ---
(8) The Korea Institute of Energy Technology(KENTECH) was established in April, 2020, in accordance with the<br>“Basic plan for the establishment of KENTECH (July, 2019)”. By the special law to create KENTECH, the Group, government, and local government may contribute to the fund. The Group will decide whether to contribute to the fund on a board<br>resolution after consulting with relevant organizations considering its financial situation by year.
--- ---
(9) The ongoing armed conflict in Ukraine started in February 2022 and relevant sanctions against Russia imposed by<br>the international community can impact not only sanctioned entities but also the entities doing business directly or indirectly with Ukraine or Russia and the entities exposed directly or indirectly to industries or economy of Russia or Ukraine. The<br>Group cannot make reasonable estimation of the financial impact of the recent conflict in Ukraine on the future events.
--- ---

164

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

50. Subsequent Events
(1) Subsequent to March 31, 2025, KEPCO borrowed long-term borrowings for the purposes of operation<br>funding and details related thereto are as follows:
--- ---
In millions of won<br><br><br>Company Type Issue date Maturity Interest rate<br>(%) Amount
--- --- --- --- --- --- --- ---
Korea Electric Power Corporation Local long-term borrowings (Mid- to long-term CP (*)) 2025.04.24 2030.04.24 3M CD+0.50 ~~W~~ 200,000
(*) The maturity of mid- to long-term CPs corresponds to contract period of commercial paper repurchase agreements.<br>
--- ---
(2) Subsequent to March 31, 2025, KEPCO and its subsidiaries, Korea Western Power Co., Ltd., Korea<br>Southern Power Co., Ltd. and Korea East-West Power Co., Ltd. issued bonds denominated in Korean won for the purposes of operation and facility funding and details related thereto are as follows:
--- ---
In millions of won
--- --- --- --- --- --- --- --- --- --- ---
Company Type Issue date Maturity Interest rate<br>(%) Amount
Korea Electric Power Corporation #1483 Corporate bond 2025.04.03 2027.04.02 2.79 ~~W~~ 300,000
#1484 Corporate bond 2025.04.03 2028.04.03 2.82 200,000
#1485 Corporate bond 2025.04.03 2030.04.03 2.89 100,000
#1486 Corporate bond 2025.04.11 2027.04.09 2.68 200,000
#1487 Corporate bond 2025.04.11 2028.04.11 2.72 200,000
#1488 Corporate bond 2025.04.11 2030.04.11 2.80 100,000
#1489 Corporate bond 2025.04.16 2027.04.16 2.63 190,000
#1490 Corporate bond 2025.04.16 2028.04.14 2.67 200,000
#1491 Corporate bond 2025.04.16 2030.04.16 2.76 110,000
#1492 Corporate bond 2025.05.08 2027.05.08 2.52 100,000
#1493 Corporate bond 2025.05.08 2028.05.08 2.54 200,000
#1494 Corporate bond 2025.05.08 2030.05.08 2.63 200,000
#1495 Corporate bond 2025.05.13 2027.05.08 2.60 100,000
#1496 Corporate bond 2025.05.13 2028.05.08 2.64 210,000
#1497 Corporate bond 2025.05.13 2030.05.08 2.76 190,000
Korea Western Power Co., Ltd. #66-1 Corporate bond 2025.04.15 2027.04.15 2.65 110,000
#66-2 Corporate bond 2025.04.15 2028.04.14 2.76 70,000
#66-3 Corporate bond 2025.04.15 2030.04.15 2.84 30,000
#67-1 Corporate bond 2025.04.29 2028.04.28 2.71 150,000
#67-2 Corporate bond 2025.04.29 2030.04.29 2.79 10,000
Korea Southern Power Co., Ltd. #78-1 Corporate bond 2025.04.22 2027.04.22 2.56 140,000
#78-2 Corporate bond 2025.04.22 2028.04.21 2.68 70,000
#78-3 Corporate bond 2025.04.22 2030.04.22 2.74 10,000
Korea East-West Power Co., Ltd. Corporate bond 2025.04.17 2026.04.17 2.52 180,000
Corporate bond 2025.04.17 2028.04.17 2.70 100,000
Corporate bond 2025.04.17 2030.04.17 2.79 70,000
Corporate bond 2025.04.28 2027.04.28 2.61 160,000
Corporate bond 2025.04.28 2028.04.28 2.69 100,000

165

Table of Contents

KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the consolidated interim financial statements, Continued

March 31, 2025 and 2024 (unaudited)

51. Adjusted Operating Profit (Loss)

The operating profit (loss) in the Group’s consolidated statements of comprehensive income or loss prepared in accordance with KIFRS included in this report differs from that in its consolidated statements of comprehensive income or loss prepared in accordance with IFRS Accounting Standards as issued by the IASB. The table below sets forth a reconciliation of the Group’s results from operating activities as presented in the Group’s consolidated interim statements of comprehensive income or loss prepared in accordance with KIFRS for each of the three-month periods ended March 31, 2025 and 2024 to the operating profit or loss as presented in the Group’s consolidated interim statements of comprehensive income or loss prepared in accordance with IFRS as issued by IASB for each of the corresponding periods.

In millions of won March 31, 2025 March 31, 2024
Operating profit on the consolidated interim statements of comprehensive income(loss) ~~W~~ 3,753,607 1,299,343
Add
Other income
Reversal of other provisions 3,113 21,812
Reversal of other bad debt allowance 6,500
Gains on government grants 47
Gains on assets contributed 181 882
Gains on liabilities exempted 280 155
Compensation and reparations revenue 20,207 20,690
Foundation fund revenue 154
Rental income 52,849 56,643
Others 9,476 25,212
Other gains
Gains on disposal of property, plant and equipment 5,363 34,053
Gains on disposal of intangible assets 11
Gains on foreign currency translation 4,162 12,931
Gains on foreign currency transactions 44,613 17,088
Others 172,464 71,021
Deduct
Other expense
Compensation and reparations expenses (1 ) (83 )
Accretion expenses of other provisions (440 ) (114 )
Depreciation expenses on investment properties (195 ) (159 )
Depreciation expenses on idle assets (904 ) (910 )
Other bad debts expense (2 ) (2,546 )
Donations (12,111 ) (91,293 )
Others (6,225 ) (7,411 )
Other losses
Losses on disposal of property, plant and equipment (37,158 ) (17,983 )
Losses on disposal of intangible assets (13 ) (110 )
Losses on foreign currency translation (10,082 ) (8,605 )
Losses on foreign currency transactions (19,688 ) (42,843 )
Others (61,089 ) (40,499 )
Adjusted operating profit ~~W~~ 3,925,108 1,347,285