6-K

Trillion Energy International Inc. (TRLEF)

6-K 2025-01-03 For: 2025-01-02
View Original
Added on April 10, 2026

UNITEDSTATESSECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM6-K

REPORTOF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16UNDER THE SECURITIES EXCHANGE ACT OF 1934

For the month of January 2025


Commission File Number: 000-55539


TRILLIONENERGY INTERNATIONAL INC.

(Translation of registrant’s name into English)

Suite700, 838 West Hastings StreetVancouver, BC, V6C 0A6(Address of principal executive offices)

Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F.

☒ Form 20-F ☐ Form 40-F

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): ☐

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): ☐

| -2- |

| --- |

On January 2, 2025, Trillion Energy International Inc. issued the news release filed herewith as exhibit 99.1 regarding the commencement of its velocity string tubing operations on the Tripod wells, to increase and produce long-term gas production.

Exhibit No.
99.1 News<br> Release January 2, 2025 – Trillion Energy Announces Commencement of Operations on Tripods
| -3- |

| --- |

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

TRILLION ENERGY INTERNATIONAL INC.
/s/ Arthur Halleran
Arthur<br> Halleran
Chief<br> Executive Officer
January<br> 2, 2025

Exhibit99.1

A blue and white logo with white text
Description automatically generated


TrillionEnergy Announces Commencement of Operations on Tripods


January2, 2025 - Vancouver, B.C. - Trillion Energy International Inc. (“Trillion” or the “Company”) (CSE: TCF) (OTCQB: TRLEF) (Frankfurt: Z62), is pleased to announce the continuation of the velocity string tubing program on two tripods after previously completing operations on the Akcakoca platform in late November.

This week, a crane barge arrived at the SASB gas field to transport the snubbing unit from the Akcakoca platform to the Akkaya tripod for the next operation on the Alapli-2 well where 2,996 meters of 2 3/8 tubing will be run.

Following the completion of Alapli-2, the crane barge will move the snubbing unit to the East Ayazli tripod where 2,888 meters of 2 3/8 VS tubing will be run in the Bayhanli-2 well.

Trillion will use three sets of burst discs in each well to float the tubing in the horizontal section of the wells during installation, which will then be ruptured. The crane barge and snubbing crew will be released once the VS string is run in the wells safely, following which, nitrogen stimulation activities will occur. Nitrogen lifting has been recently proven effective in kicking off the gas wells to date.

The whole operation is expected to be completed within approximately two weeks, weather permitting.

The Company and its technical advisors will continue working onsite to optimize production. Gas lift compressors are currently being sized for various wells, the first being South Akcakoca.

Aboutthe Company


Trillion Energy International Inc is focused on oil and natural gas production for Europe and Türkiye with natural gas assets in Türkiye. The Company is 49% owner of the SASB natural gas field, a Black Sea natural gas development and a 19.6% (except three wells with 9.8%) interest in the Cendere oil field. More information may be found on www.sedar.com, and our website.

Contact


Brian Park, VP of Finance

1-778-819-1585

E-mail: info@trillionenergy.com

Website: www.trillionenergy.com

A blue and white logo with white text
Description automatically generated

CautionaryStatement Regarding Forward-Looking Statements


Thisnews release may contain certain forward-looking information and statements, including without limitation, statements pertaining to theCompany’s ability to obtain regulatory approval of the executive officer and director appointments. All statements included herein,other than statements of historical fact, are forward-looking information and such information involves various risks and uncertainties.Trillion does not undertake to update any forward-looking information except in accordance with applicable securities laws.

Thesestatements are no guarantee of future performance and are subject to certain risks, uncertainties, delay, change of strategy, and assumptionsthat are difficult to predict and which may change over time. Accordingly, actual results and strategies could differ materially andadversely from those expressed in any forward-looking statements as a result of various factors. These factors include unforeseen securitiesregulatory challenges, COVID, oil and gas price fluctuations, operational and geological risks, changes in capital raising strategies,the ability of the Company to raise necessary funds for development; the outcome of commercial negotiations; changes in technical oroperating conditions; the cost of extracting gas and oil may increase and be too costly so that it is uneconomic and not profitable todo so and other factors discussed from time to time in the Company’s filings on www.sedar.com, including the most recently filedAnnual Report on Form 20-F and subsequent filings. For a full summary of our oil and gas reserves information for Turkey, please referto our Forms F-1,2,3 51-101 filed on www.sedar.com, and or request a copy of our reserves report effective December 31, 2022 and updatedJanuary 31 2023.