Skip to main content

B2gold Corp 6-K, filed Aug 6, 2020

B2gold Corp (BTG)

6-K 2020-08-06 For: 2020-06-30
View Original
Added on April 11, 2026

About this 6-K

B2gold Corp filed this 6-K on August 6, 2020.

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 6-K

REPORT OF FOREIGN PRIVATE ISSUER

PURSUANT TO RULE 13a-16 OR 15d-16

UNDER THE SECURITIES EXCHANGE ACT OF 1934

For the month of August, 2020

Commission File Number: 001-35936

B2Gold Corp.

(Translation of registrant’s name into English)

British Columbia, Canada

(Jurisdiction of incorporation or organization)

Suite 3100, Three Bentall Centre

595 Burrard Street

Vancouver, British Columbia V7X 1J1

Canada

(Address of principal executive office)

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F:

[   ] Form 20-F              [X] Form 40-F

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): [   ]

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): [   ]

DOCUMENTS INCLUDED AS PART OF THIS FORM 6-K

See the Exhibit Index hereto.

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

B2Gold Corp.
Date: August 5, 2020 By: /s/ Roger Richer
Name: Roger Richer
Title: Executive Vice President, General Counsel & Secretary

EXHIBIT INDEX

Exhibit
No. Description
99.1 Consolidated Financial Statements for the Six Months Ended June 30, 2020
99.2 Management’s Discussion and Analysis for the Quarter Ended June 30, 2020
99.3 Certification of Interim Filing - CEO
99.4 Certification of Interim Filing - CFO

Document

image111.jpg

B2GOLD CORP.

Condensed Interim Consolidated Financial Statements

For the three and six months ended June 30, 2020

(Unaudited)

B2GOLD CORP.

CONDENSED INTERIM CONSOLIDATED STATEMENTS OF OPERATIONS

FOR THE THREE AND SIX MONTHS ENDED JUNE 30

(Expressed in thousands of United States dollars, except per share amounts)

(Unaudited)

For the three<br>months ended<br>June 30, 2020 For the three<br>months ended<br>June 30, 2019 For the six<br>months ended<br>June 30, 2020 For the six<br>months ended<br>June 30, 2019
Gold revenue $ 441,939 $ 267,213 $ 822,237 $ 531,195
Cost of sales
Production costs (96,987) (95,313) (188,543) (188,150)
Depreciation and depletion (75,582) (56,981) (146,194) (117,612)
Royalties and production taxes (31,234) (17,552) (56,965) (35,506)
Total cost of sales (203,803) (169,846) (391,702) (341,268)
Gross profit 238,136 97,367 430,535 189,927
General and administrative (8,062) (11,662) (18,250) (26,448)
Share-based payments (Note 9) (7,440) (6,054) (11,087) (10,036)
Community relations (492) (465) (4,226) (1,143)
Foreign exchange (losses) gains (3,101) (76) (4,333) 1,250
Share of (loss) income of associate (3,765) — 2,635 —
Write-down of mineral property interests — (1,352) — (1,352)
Other (3,855) 814 (4,428) 517
Operating income 211,421 78,572 390,846 152,715
Interest and financing expense (5,051) (7,078) (9,568) (14,517)
Gains (losses) on derivative instruments 3,430 (2,914) (11,412) 3,332
Other 1,108 (437) 929 (503)
Income from continuing operations before taxes 210,908 68,143 370,795 141,027
Current income tax, withholding and other taxes (Note 13) (82,229) (24,123) (145,699) (49,692)
Deferred income tax recovery (expense) (Note 13) 9,282 971 (4,127) (11,099)
Net income from continuing operations 137,961 44,991 220,969 80,236
Loss from discontinued operations attributable to shareholders of the Company — (3,669) — (12,391)
Net income for the period $ 137,961 $ 41,322 $ 220,969 $ 67,845
Attributable to:
Shareholders of the Company $ 124,446 $ 37,904 $ 196,733 $ 60,199
Non-controlling interests (Note 10) 13,515 3,418 24,236 7,646
Net income for the period $ 137,961 $ 41,322 $ 220,969 $ 67,845
Earnings per share from continuing operations<br><br>(attributable to shareholders of the Company) (Note 9)
Basic $ 0.12 $ 0.04 $ 0.19 $ 0.07
Diluted $ 0.12 $ 0.04 $ 0.19 $ 0.07
Earnings per share<br><br>(attributable to shareholders of the Company) (Note 9)
Basic $ 0.12 $ 0.04 $ 0.19 $ 0.06
Diluted $ 0.12 $ 0.04 $ 0.19 $ 0.06
Weighted average number of common shares outstanding<br><br>(in thousands) (Note 9)
Basic 1,040,661 1,008,345 1,037,847 1,004,897
Diluted 1,058,388 1,016,322 1,053,696 1,014,725

See accompanying notes to condensed interim consolidated financial statements.

B2GOLD CORP.

CONDENSED INTERIM CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME

FOR THE THREE AND SIX MONTHS ENDED JUNE 30

(Expressed in thousands of United States dollars)

(Unaudited)

For the three<br>months ended<br>June 30, 2020 For the three<br>months ended<br>June 30, 2019 For the six<br>months ended<br>June 30, 2020 For the six<br>months ended<br>June 30, 2019
Net income for the period $ 137,961 $ 41,322 $ 220,969 $ 67,845
Other comprehensive income
Items that will not be subsequently reclassified to net income:
Unrealized gain on investment 1,276 693 525 1,362
Other comprehensive income for the period 1,276 693 525 1,362
Total comprehensive income for the period $ 139,237 $ 42,015 $ 221,494 $ 69,207
Other comprehensive income attributable to:
Shareholders of the Company $ 1,276 $ 693 $ 525 $ 1,362
Non-controlling interests — — — —
$ 1,276 $ 693 $ 525 $ 1,362
Total comprehensive income attributable to:
Shareholders of the Company $ 125,722 $ 38,597 $ 197,258 $ 61,561
Non-controlling interests 13,515 3,418 24,236 7,646
$ 139,237 $ 42,015 $ 221,494 $ 69,207

See accompanying notes to condensed interim consolidated financial statements.

B2GOLD CORP.

CONDENSED INTERIM CONSOLIDATED STATEMENTS OF CASH FLOWS

FOR THE THREE AND SIX MONTHS ENDED JUNE 30

(Expressed in thousands of United States dollars)

(Unaudited)

For the three<br>months ended<br>June 30, 2020 For the three<br>months ended<br>June 30, 2019 For the six<br>months ended<br>June 30, 2020 For the six<br>months ended<br>June 30, 2019
Operating activities
Net income from continuing operations for the period $ 137,961 $ 44,991 $ 220,969 $ 80,236
Mine restoration provisions settled (19) — (208) (124)
Non-cash charges, net (Note 14) 74,891 62,267 179,420 119,290
Changes in non-cash working capital (Note 14) 28,558 (25,632) 60,301 (30,739)
Changes in long-term value added tax receivables (3,302) 1,756 (6,180) (83)
Cash provided by operating activities of continuing operations 238,089 83,382 454,302 168,580
Cash provided by operating activities of discontinued operations — 9,434 — 10,654
Cash provided by operating activities 238,089 92,816 454,302 179,234
Financing activities
Revolving credit facility, drawdowns net of transaction costs (Note 8) 250,000 (5,574) 250,000 (5,574)
Repayment of revolving credit facility (Note 8) — (25,000) (25,000) (25,000)
Equipment loan facilities, drawdowns net of transaction costs — 3,463 — 3,463
Repayment of equipment loan facilities (Note 8) (4,937) (10,067) (15,733) (12,379)
Interest and commitment fees paid (4,128) (6,499) (7,904) (12,269)
Common shares issued for cash on exercise of stock options<br><br>(Note 9) 11,121 7,005 27,465 28,170
Dividends paid (Note 9) — — (10,368) —
Principal payments on lease arrangements (Note 8) (816) (744) (1,645) (1,501)
Restricted cash movement 174 (398) 2,278 (1,254)
Cash provided (used) by financing activities of continuing operations 251,414 (37,814) 219,093 (26,344)
Cash used by financing activities of discontinued operations — (99) — (282)
Cash provided (used) by financing activities 251,414 (37,913) 219,093 (26,626)
Investing activities
Expenditures on mining interests:
Fekola Mine (52,340) (12,829) (126,473) (34,113)
Masbate Mine (4,529) (7,520) (9,290) (15,964)
Otjikoto Mine (10,920) (17,221) (22,652) (24,503)
Gramalote Project (446) (614) (13,124) (1,802)
Other exploration and development (Note 14) (11,883) (12,563) (21,247) (19,184)
Non-refundable deposit received on Toega Property (Note 6) 9,000 — 9,000 —
Other 1,109 553 1,092 402
Cash used by investing activities of continuing operations (70,009) (50,194) (182,694) (95,164)
Cash used by investing activities of discontinued operations — (23,164) — (36,691)
Cash used by investing activities (70,009) (73,358) (182,694) (131,855)
Increase (decrease) in cash and cash equivalents 419,494 (18,455) 490,701 20,753
Effect of exchange rate changes on cash and cash equivalents 236 638 (3,628) 261
Cash and cash equivalents, beginning of period 207,939 141,583 140,596 102,752
Less cash associated with discontinued operations, end of period — (10,245) — (10,245)
Cash and cash equivalents, end of period $ 627,669 $ 113,521 $ 627,669 $ 113,521
Supplementary cash flow information (Note 14)

See accompanying notes to condensed interim consolidated financial statements.

B2GOLD CORP.

CONDENSED INTERIM CONSOLIDATED BALANCE SHEETS

(Expressed in thousands of United States dollars)

(Unaudited)

As at June 30,<br>2020 As at December 31,<br>2019
Assets
Current
Cash and cash equivalents $ 627,669 $ 140,596
Accounts receivable, prepaids and other (Note 4) 37,541 37,890
Value-added and other tax receivables 11,752 11,070
Inventories (Note 5) 244,963 217,923
Assets classified as held for sale (Note 6) 11,855 22,021
933,780 429,500
Value-added tax receivables 35,503 25,153
Mining interests (Note 6 and Note 17 - Schedules)
Owned by subsidiaries and joint operations 2,170,394 2,046,731
Investments in joint ventures and associates 56,106 130,736
Other assets (Note 7) 47,272 49,615
Deferred income taxes 3,248 1,336
$ 3,246,303 $ 2,683,071
Liabilities
Current
Accounts payable and accrued liabilities $ 78,374 $ 83,370
Current income and other taxes payable 135,909 53,396
Dividend payable (Note 9) 20,850 —
Current portion of long-term debt (Note 8) 22,342 26,030
Current portion of derivative instruments at fair value (Note 11) 5,935 1,909
Other current liabilities 2,756 357
266,166 165,062
Long-term debt (Note 8) 448,750 235,821
Mine restoration provisions 89,512 75,419
Deferred income taxes 151,630 145,590
Employee benefits obligation 5,252 4,736
Other long-term liabilities 7,805 4,791
969,115 631,419
Equity
Shareholders’ equity
Share capital (Note 9)
Issued: 1,043,204,042 common shares (Dec 31, 2019 – 1,030,399,987) 2,380,922 2,339,874
Contributed surplus 50,611 56,685
Accumulated other comprehensive loss (144,546) (145,071)
Deficit (93,858) (261,245)
2,193,129 1,990,243
Non-controlling interests (Note 10) 84,059 61,409
2,277,188 2,051,652
$ 3,246,303 $ 2,683,071
Commitments (Note 16) Approved by the Board "Clive T. Johnson" Director "Robert J. Gayton" Director
--- --- --- --- ---

See accompanying notes to condensed interim consolidated financial statements.

B2GOLD CORP.

CONDENSED INTERIM CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY

FOR THE SIX MONTHS ENDED JUNE 30

(Expressed in thousands of United States dollars)

(Unaudited)

2020
Shares<br>(‘000’s) Share<br>capital Contributed<br><br>surplus Accumulated<br><br>other<br><br>comprehensive<br><br>loss Deficit Non-<br><br>controlling<br><br>interests Total<br>equity
Balance at December 31, 2019 1,030,400 $ 2,339,874 $ 56,685 $ (145,071) $ (261,245) $ 61,409 $ 2,051,652
Net income for the period — — — — 196,733 24,236 220,969
Dividends (Note 9) — — — — (31,217) — (31,217)
Unrealised gain on investments — — — 525 — — 525
Shares issued on exercise of stock options (Note 9) 11,838 26,829 — — — — 26,829
Shares issued on vesting of RSUs<br><br>(Note 9) 966 2,677 (2,677) — — — —
Interest on loan to non-controlling interest — — — — 1,871 (1,586) 285
Share-based payments (Note 9) — — 8,145 — — — 8,145
Transfer to share capital on exercise of stock options — 11,542 (11,542) — — — —
Balance at June 30, 2020 1,043,204 $ 2,380,922 $ 50,611 $ (144,546) $ (93,858) $ 84,059 $ 2,277,188
2019
--- --- --- --- --- --- --- --- --- --- --- --- --- ---
Shares<br>(‘000’s) Share<br>capital Contributed<br><br>surplus Accumulated<br><br>other<br><br>comprehensive<br><br>loss Deficit Non-<br><br>controlling<br><br>interests Total<br>equity
Balance at December 31, 2018 994,622 $ 2,234,050 $ 70,889 $ (146,153) $ (547,839) $ 41,906 $ 1,652,853
Net income for the period — — — — 60,199 7,646 67,845
Unrealised gain on investments — — — 1,362 — — 1,362
Shares issued on exercise of stock options (Note 9) 14,772 26,910 — — — — 26,910
Shares issued on vesting of RSUs<br><br>(Note 9) 539 1,523 (1,523) — — — —
Interest on loan to non-controlling interest — — — — 1,726 (1,466) 260
Share-based payments (Note 9) — — 11,615 — — — 11,615
Transfer to share capital on exercise of stock options — 11,281 (11,281) — — — —
Balance at June 30, 2019 1,009,933 $ 2,273,764 $ 69,700 $ (144,791) $ (485,914) $ 48,086 $ 1,760,845

See accompanying notes to condensed interim consolidated financial statements.

B2GOLD CORP.

NOTES TO THE CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS

For the six months ended June 30, 2020

(All tabular amounts are in thousands of United States dollars unless otherwise stated)

(Unaudited)

1 Nature of operations

B2Gold Corp. (“B2Gold” or the “Company”) is a Vancouver-based gold producer with three operating mines. The Company operates the Fekola Mine in Mali, the Masbate Mine in the Philippines and the Otjikoto Mine in Namibia. Up to October 14, 2019, the Company operated two additional mines in Nicaragua - La Libertad and El Limon mines (see Note 6). The Company also has a 50% joint operation interest in the Gramalote Project in Colombia (see Note 6) and an 81% interest in the Kiaka Project in Burkina Faso. In addition, the Company has a portfolio of other evaluation and exploration assets in Mali, Burkina Faso, Namibia, Uzbekistan and Finland.

B2Gold is a public company which is listed on the Toronto Stock Exchange under the symbol “BTO”, the NYSE American LLC under the symbol “BTG” and the Namibian Stock Exchange under the symbol “B2G”. B2Gold’s head office is located at Suite 3100, Three Bentall Centre, 595 Burrard Street, Vancouver, British Columbia, V7X 1J1.

2 Basis of preparation

These condensed interim consolidated financial statements have been prepared in accordance with International Accounting Standard 34, Interim Financial Reporting of International Financial Reporting Standards ("IFRS") as issued by the International Accounting Standards Board ("IASB"). These condensed interim consolidated financial statements should be read in conjunction with the audited consolidated financial statements for the year ended December 31, 2019, which have been prepared in accordance with IFRS as issued by the IASB.

These condensed interim consolidated financial statements follow the same accounting policies and methods of application as the most recent audited consolidated financial statements of the Company.

These condensed consolidated interim financial statements were authorized for issue by the Board of Directors on August 5, 2020.

3 Significant accounting judgements and estimates

The preparation of these financial statements in conformity with IFRS requires judgements and estimates that affect the amounts reported. Those judgements and estimates concerning the future may differ from actual results. In addition to those reported in the 2019 annual consolidated financial statements, the following are the areas of accounting policy judgement and accounting estimates applied by management that most significantly affect the Company’s financial statements, including those areas of estimation uncertainty that could result in a material adjustment to the carrying amounts of assets and liabilities within the next financial year.

COVID-19 estimation uncertainty

A global pandemic related to COVID-19 was declared by the World Health Organization in March 2020. The current and expected impacts on global commerce have been and are anticipated to continue to be far-reaching. To date, globally, there has been significant volatility in commodity prices and foreign exchange rates, restrictions on the conduct of business in many jurisdictions, including travel restrictions, and supply chain disruptions. There is significant ongoing global uncertainty surrounding COVID-19 and the extent and duration of the impact that it may have.

The areas of judgement and estimation uncertainty for the Company which may be impacted include estimates used to determine recoverable reserves and resources, estimates used to determine the recoverable amounts of long-lived assets, estimates used to determine the recoverable amounts of value-added tax receivables and estimates regarding deferred income taxes and valuation allowances. Changes related to these could be material.

Mineral reserve and resource estimates

Mineral reserves are estimates of the amount of ore that can be economically and legally extracted from the Company’s mining properties. The Company estimates its Mineral reserves and mineral resources based on information compiled by appropriately qualified persons relating to the geological data on the size, depth and shape of the ore body, and requires complex geological judgements to interpret the data. The estimation of recoverable reserves is based upon factors such as estimates of foreign exchange rates, commodity prices, future capital requirements, metallurgical recoveries, permitting and production costs along with geological assumptions and judgements made in estimating the size, and grade of the ore body. Changes in the reserve or resource estimates may impact the carrying value of mining interests, mine restoration provisions, recognition of deferred tax assets, depreciation and amortization charges and royalties receivable.

B2GOLD CORP.

NOTES TO THE CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS

For the six months ended June 30, 2020

(All tabular amounts are in thousands of United States dollars unless otherwise stated)

(Unaudited)

Impairment of long-lived assets

Long-lived assets are tested for impairment, or reversal of a previous impairment, if there is an indicator of impairment or a subsequent reversal. Calculating the estimated recoverable amount of cash generating units for long-lived asset requires management to make estimates and assumptions with respect to future production levels, mill recoveries, operating and capital costs, future metal prices, foreign exchange rates, taxation rates, and discount rates in its life-of-mine plans and preparation of updated feasibility level technical studies when relevant. Changes in any of the assumptions or estimates used in determining the recoverable amount could impact the analysis. Such changes could be material.

Value-added tax receivables

The Company incurs indirect taxes, including value-added tax, on purchases of goods and services at its operating mines and development projects. Indirect tax balances are recorded at their estimated recoverable amounts within current or long-term assets, net of provisions, and reflect the Company’s best estimate of their recoverability under existing tax rules in the respective jurisdictions in which they arise. Management’s assessment of recoverability considers the probable outcomes of claimed deductions and/or disputes. The provisions and balance sheet classifications made to date may be subject to change and such change may be material.

Current and deferred income taxes

The Company is periodically required to estimate the tax basis of assets and liabilities. Where applicable tax laws and regulations are either unclear or subject to varying interpretations, it is possible that changes in these estimates could occur that materially affect the amounts of deferred income tax assets and liabilities recorded in the financial statements. Changes in deferred tax assets and liabilities generally have a direct impact on earnings in the period that the changes occur.

Each period, the Company evaluates the likelihood of whether some portion or all of each deferred tax asset will not be realized. This evaluation is based on historic and future expected levels of taxable income, the pattern and timing of reversals of taxable temporary timing differences that give rise to deferred tax liabilities, and tax planning initiatives. Levels of future taxable income are affected by, among other things, market gold prices, production costs, quantities of proven and probable gold reserves, interest rates and foreign currency exchange rates.

Uncertain tax positions

The Company’s operations involve the application of complex tax regulations in multiple international jurisdictions. Determining the tax treatment of a transaction requires the Company to apply judgement in its interpretation of the applicable tax law. These positions are not final until accepted by the relevant tax authority. The tax treatment may change based on the result of assessments or audits by the tax authorities often years after the initial filing.

The Company recognizes and records potential liabilities for uncertain tax positions based on its assessment of the amount,

or range of amounts of tax that will be due. The Company adjusts these accruals as new information becomes available. Due to the complexity and uncertainty associated with certain tax treatments, the ultimate resolution could result in a payment that is materially different from the Company’s current estimate of the tax liabilities.

Determination of control or significant influence over investees

The assessment of whether the Company has a significant influence or control over an investee requires the application of judgement when assessing factors that could give rise to a significant influence or control. Factors evaluated when making a judgement of control or significant influence over an investee include, but are not limited to, ownership percentage, representation on the board of directors, participation in the policy-making process, material transactions and contractual arrangements between the Company and the investee, interchange of managerial personnel, provision of essential technical information and potential voting rights. In evaluating these factors, the Company determines the level of power over the investee the Company has. Changes in the Company's assessment of the factors used in determining if control or significant influence exists over an investee would impact the accounting treatment of the investment in the investee.

Joint Arrangements

The Company is party to arrangements over which it does not have control. Judgment is required in determining whether joint control over these arrangements exists, which parties have joint control and whether the arrangement is a joint venture or joint operation. In assessing whether it has joint control, the Company analyzes the activities of the arrangement to determine which activities most significantly affect the returns of the arrangement over its life. These activities are determined to be the relevant activities of the arrangement. If unanimous consent is required over the decisions about the

B2GOLD CORP.

NOTES TO THE CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS

For the six months ended June 30, 2020

(All tabular amounts are in thousands of United States dollars unless otherwise stated)

(Unaudited)

relevant activities, the parties whose consent is required have joint control. The judgments around which activities are considered the relevant activities of the arrangement are subject to analysis by each of the parties to the arrangement and may be interpreted differently. When performing this assessment, the Company generally considers decisions about activities such as managing the asset while it is being designed, developed and constructed, during its operating life and during the closure period. It may also consider other activities including the approval of budgets, expansion and disposition of assets, financing, significant operating and capital expenditures, appointment of key management personnel, representation on the board of directors and other items. When circumstances or contractual terms change, the Company reassesses the control group and the relevant activities of the arrangement.

If the Company has joint control over an arrangement, an assessment of whether the arrangement is a joint venture or joint operation is required. This assessment is based on whether the Company has rights to the assets, and obligations for the liabilities of the arrangement or whether the Company has rights to the net assets of the arrangement. In making this determination, the Company reviews the legal form of the arrangement, the terms of the contractual arrangement and other facts and circumstances. In a situation where the legal form and the terms of the contractual arrangement do not give us rights to the assets and obligations for the liabilities, an assessment of other facts and circumstances is required, including whether the activities of the arrangement are primarily designed for the provision of output to the parties and whether the parties are substantially the only source of cash flows contributing to the arrangement. The consideration of other facts and circumstances may result in the conclusion that a joint arrangement is a joint operation. This conclusion requires judgment and is specific to each arrangement.

4 Accounts receivable, prepaids and other

June 30, 2020 December 31, 2019
$ $
Due from associate 14,435 14,441
Supplier advances 11,747 13,768
Prepaid expenses 3,596 2,221
Other receivables 7,763 7,460
37,541 37,890

During the quarter ended March 31, 2020, the Company agreed to extend the term of the deferred consideration due from its associate, Calibre, by six months to April 15, 2021.

5 Inventories

June 30, 2020 December 31, 2019
$ $
Gold and silver bullion 38,830 46,484
In-process inventory 13,068 10,297
Ore stock-pile inventory 79,100 62,695
Materials and supplies 113,965 98,447
244,963 217,923

Ore stock-pile inventory includes amounts for the Fekola Mine of $48 million (December 31, 2019 - $33 million), for the Otjikoto Mine of $30 million (December 31, 2019 – $28 million), and for the Masbate Mine of $1 million (December 31, 2019 - $2 million).

B2GOLD CORP.

NOTES TO THE CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS

For the six months ended June 30, 2020

(All tabular amounts are in thousands of United States dollars unless otherwise stated)

(Unaudited)

6 Mining interests

June 30, 2020 December 31, 2019
$ $
Property, plant and equipment (depletable)
Fekola Mine, Mali
Cost 1,459,422 1,322,865
Accumulated depreciation and depletion (348,260) (258,580)
1,111,162 1,064,285
Masbate Mine, Philippines
Cost, net of impairment 833,594 815,418
Accumulated depreciation and depletion (322,459) (295,616)
511,135 519,802
Otjikoto Mine, Namibia
Cost 646,752 638,664
Accumulated depreciation and depletion (344,496) (323,152)
302,256 315,512
Exploration and evaluation properties (non-depletable)
Gramalote, Colombia, net of impairment 86,746 —
Kiaka, Burkina Faso 78,926 76,807
Anaconda Regional, Mali 31,343 27,139
Mocoa Royalty, Colombia 10,230 10,230
Ondundu, Namibia 10,121 9,778
Finland Properties, Finland 7,495 6,697
Other 19,220 14,321
244,081 144,972
Corporate & other
Office, furniture and equipment, net 1,760 2,160
2,170,394 2,046,731
Investments in joint ventures and associates (accounted for using the equity method)
Gramalote, Colombia, net of impairment — 77,265
Calibre, Nicaragua 56,106 53,471
56,106 130,736
2,226,500 2,177,467

Gramalote

On December 23, 2019, the Company and AngloGold Ashanti Limited (“AngloGold”) entered into an amended and restated shareholders agreement for the Gramalote Project in Colombia. Under the revised agreement, B2Gold agreed to sole fund the first $13.9 million of 2020 budgeted expenditures on the Gramalote Project in Colombia, following which B2Gold and AngloGold will each hold a 50% ownership interest in the joint venture ($10.9 million of the sole fund amount) and B2Gold would continue its role of manager of the Gramalote joint venture, which it assumed on January 1, 2020 ($3 million of the sole fund amount). During the six months ended June 30, 2020, the Company sole-funded $12.5 million of expenditures on the Gramalote Project, which resulted in the Company's interest being increased to 50%. As a result of change to the shareholder agreement and completion of the $10.9 million sole fund amount, the Company has determined that the Gramalote Project meets the definition of a Joint Operation in accordance with IFRS 11, Joint Arrangements effective June 30, 2020, and the Company has proportionately consolidated its share of the assets and liabilities of the Gramalote Project.

Subsequent to June 30, 2020, the remaining sole-fund amount of $1.4 million was completed resulting in the Company having met its sole-funding obligation of $13.9 million under the amended shareholder agreement. Each of B2Gold and its partner AngloGold Ashanti will fund its share of expenditures pro rata going forward.

B2GOLD CORP.

NOTES TO THE CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS

For the six months ended June 30, 2020

(All tabular amounts are in thousands of United States dollars unless otherwise stated)

(Unaudited)

Toega

On April 28, 2020, the Company and its 10% partner GAMS-Mining F&I Ltd ("GAMS") entered into a definitive agreement with West African Resources Limited ("West African") for the sale of the Toega property located in Burkina Faso. The purchase consideration, due 90% to B2Gold and 10% to GAMS, consists of: an initial non-refundable cash payment of $10 million; a further payment of $10 million in cash or shares due upon completion of a feasibility study within 2 years (at which time the permits comprising the Toega project will be transferred to West African); production payments of $25 million in the form of a 3% net smelter returns ("NSR") royalty on production from the Toega project area; and a further 0.5% NSR royalty (to commence after the 3% NSR outlined above has been fully paid) which is capped at 1.5 million ounces.

As a result of the transaction, the Company's $9 million share of the non-refundable cash payment has been credited to the carrying value of the mineral property and the remaining value of the Toega property of $12 million has been classified as an asset held for sale on the Condensed Interim Consolidated Balance Sheet at June 30, 2020.

Sale of Nicaraguan Group

On October 15, 2019, the Company completed the sale of El Limon Mine, La Libertad Mine and other additional concessions in Nicaragua (collectively, the "Nicaraguan Group") to Calibre Mining Corp. ("Calibre") for consideration measured at $116 million (net of transaction costs). In accordance with IFRS 5 Non-current assets held for sale and discontinued operations, the Nicaraguan Group met the definition of a discontinued operation for the three and six months ended June 30, 2020. The results of the Nicaraguan Group for the comparative period have been presented as discontinued operations in the Condensed Interim Consolidated Statement of Operations and the Condensed Interim Consolidated Statement of Cash Flows.

7 Other assets

June 30, 2020 December 31, 2019
$ $
Low-grade stockpile 27,030 24,153
Debt service reserve accounts (Note 8) 9,009 11,783
Reclamation deposits 7,141 6,653
Long-term investments 3,341 2,816
Loan receivable, including accrued interest 493 3,984
Other 258 226
47,272 49,615

8 Long-term debt

June 30, 2020 December 31, 2019
$ $
Revolving credit facility:
Principal amount 425,000 200,000
Less: unamortized transaction costs (6,587) (7,713)
418,413 192,287
Equipment loans and lease obligations:
Fekola equipment loan facility (net of unamortized transaction costs) 35,293 43,061
Masbate equipment loan facility (net of unamortized transaction costs) 9,082 10,799
Otjikoto equipment loan facility (net of unamortized transaction costs) — 5,973
Lease liabilities 8,304 9,731
52,679 69,564
471,092 261,851
Less: current portion (22,342) (26,030)
448,750 235,821

B2GOLD CORP.

NOTES TO THE CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS

For the six months ended June 30, 2020

(All tabular amounts are in thousands of United States dollars unless otherwise stated)

(Unaudited)

The changes in debt balances during the six months ended June 30, 2020 are as follows:

Revolving credit facility Equipment loans Lease liabilities Total
$ $ $ $
Balance at December 31, 2019 192,287 59,833 9,731 261,851
Drawdowns 250,000 — — 250,000
Debt repayments (25,000) (15,733) (1,645) (42,378)
Foreign exchange gains — (72) (116) (188)
Non-cash interest and financing expense 1,126 347 334 1,807
Balance at June 30, 2020 418,413 44,375 8,304 471,092
Less current portion — (19,607) (2,735) (22,342)
418,413 24,768 5,569 448,750

Revolving credit facility

On May 10, 2019, the Company entered into a revised revolving credit facility ("RCF") agreement with its existing syndicate of banks plus one new lender. The maximum available for drawdown under the facility was increased from $500 million to $600 million with an accordion feature, available on the receipt of additional binding commitments, for a further $200 million.

The RCF bears interest on a sliding scale of between LIBOR plus 2.125% to 2.75% based on the Company’s consolidated net leverage ratio. Commitment fees for the undrawn portion of the facility are also on a similar sliding scale basis of between 0.478% and 0.619%. The term of the RCF is four years, maturing on May 9, 2023.

The Company has provided security on the RCF in the form of a general security interest over the Company’s assets and pledges creating a charge over the shares of certain of the Company’s direct and indirect subsidiaries. In connection with the RCF, the Company must also maintain certain ratios for leverage and interest coverage. As at June 30, 2020, the Company was in compliance with these debt covenants.

On April 8, 2020, the Company drew down $250 million under the RCF. As at June 30, 2020, the Company had drawn down $425 million under the $600 million RCF, leaving an undrawn and available balance of $175 million.

Fekola equipment loan facility

The Company is required to maintain a deposit in a debt service reserve account (“DSRA”) equal at all times to the total of the principal, interest and other payments that become payable over the next six month period. At June 30, 2020, the balance in the DSRA was Euro 8 million ($9 million equivalent).

Otjikoto equipment loan facility

The Otjikoto equipment loan facility was scheduled for repayment on or before December 31, 2023. On March 30, 2020, the Company elected to voluntarily repay the outstanding balance on the Otjikoto equipment loan facility of $6 million.

9 Share capital

The Company’s authorized share capital consists of an unlimited number of common shares and an unlimited number of preferred shares. As at June 30, 2020, the Company had 1,043,204,042 common shares outstanding, including 1,705,000 common shares being held in trust under the Company’s Incentive Plan. No preferred shares were outstanding.

On March 23, 2020, the Company paid a dividend of $0.01 per share totaling $10 million. On June 12, 2020, the Company declared the second quarter dividend of $0.02 per share. Subsequent to June 30, 2020, on July 7, 2020, the Company paid the second quarter dividend of $21 million. The total year-to-date dividends of $31 million have been recognized in deficit in the Condensed Interim Consolidated Statement of Changes in Equity during the period.

For the three and six months ended June 30, 2020, share-based payments expense relating to the vesting of stock options, was $2 million and $4 million, respectively (2019 - $3 million and $6 million, respectively). During the three and six months ended June 30, 2019, $0 million and $1 million, respectively, was capitalized to mining interests and $0 million and $1

B2GOLD CORP.

NOTES TO THE CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS

For the six months ended June 30, 2020

(All tabular amounts are in thousands of United States dollars unless otherwise stated)

(Unaudited)

million, respectively, was included in the results of discontinued operations. For the three and six months ended June 30, 2020, the Company issued 12 million shares for proceeds of $27 million upon the exercise of stock options. As at June 30, 2020, 24 million stock options were outstanding. Subsequent to June 30, 2020, the Company issued a further 2 million shares for proceeds of $5 million on the exercise of stock options.

For the three and six months ended June 30, 2020, share-based payments expense relating to the vesting of restricted share units ("RSUs") was $1 million and $3 million, respectively (2019 - $2 million and $3 million, respectively). During the six months ended June 30, 2020, 2 million RSUs, were granted to employees of the Company and 1 million shares were issued on the vesting of RSUs. As at June 30, 2020, 5 million RSUs were outstanding.

For the three and six months ended June 30, 2020, share-based payments expense relating to the vesting of performance share units ("PSUs") was $1 million and $1 million, respectively (2019 - $0 million and $0 million, respectively). During the six months ended June 30, 2020, 2 million PSUs were issued to employees of the Company. As at June 30, 2020, 2 million PSUs were outstanding.

During the three and six months ended June 30, 2020, 8,000 and 324,000 deferred share units ("DSUs"), respectively, were issued to Directors of the Company. As at June 30, 2020, 1,200,000 DSUs were outstanding.

Earnings per share

The following is the calculation of net income and diluted net income attributable to shareholders of the Company for the period:

For the three<br>months ended<br>June 30, 2020 For the three<br>months ended<br>June 30, 2019 For the six<br>months ended<br>June 30, 2020 For the six<br>months ended<br>June 30, 2019
Net income from continuing operations $ 137,961 $ 44,991 $ 220,969 $ 80,236
Non-controlling interests (13,515) (3,418) (24,236) (7,646)
Net income and diluted net income from continuing operations (attributable to shareholders of the Company) $ 124,446 $ 41,573 $ 196,733 $ 72,590
Loss from discontinued operations attributable to shareholders of the Company — $ (3,669) — (12,391)
Net income and diluted net income (attributable to shareholders of the Company) $ 124,446 $ 37,904 $ 196,733 $ 60,199

The following is the calculation of diluted weighted average number of common shares outstanding for the period:

For the three<br>months ended<br>June 30, 2020 For the three<br>months ended<br>June 30, 2019 For the six<br>months ended<br>June 30, 2020 For the six<br>months ended<br>June 30, 2019
Basic weighted average number of common shares outstanding (in thousands) 1,040,661 1,008,345 1,037,847 1,004,897
Effect of dilutive securities:
Stock options 12,348 7,785 10,759 9,510
Restricted share units 2,553 192 2,264 318
Performance share units 2,826 — 2,826 —
Diluted weighted average number of common shares outstanding (in thousands) 1,058,388 1,016,322 1,053,696 1,014,725

B2GOLD CORP.

NOTES TO THE CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS

For the six months ended June 30, 2020

(All tabular amounts are in thousands of United States dollars unless otherwise stated)

(Unaudited)

The following is the basic and diluted earnings per share:

For the three<br>months ended<br>June 30, 2020 For the three<br>months ended<br>June 30, 2019 For the six<br>months ended<br>June 30, 2020 For the six<br>months ended<br>June 30, 2019
Earnings per share from continuing operations (attributable to shareholders of the Company)
Basic $ 0.12 $ 0.04 $ 0.19 $ 0.07
Diluted $ 0.12 $ 0.04 $ 0.19 $ 0.07
Earnings per share (attributable to shareholders of the Company)
Basic $ 0.12 $ 0.04 $ 0.19 $ 0.06
Diluted $ 0.12 $ 0.04 $ 0.19 $ 0.06

10 Non-controlling interest

The following is a continuity schedule of the Company's non-controlling interests:

Fekola Masbate Otjikoto Other Total
$ $ $ $ $
Balance at December 31, 2019 30,429 16,189 13,877 914 61,409
Share of net income (loss) 21,207 (260) 3,299 (10) 24,236
Interest on loan to non-controlling interest (1,586) — — — (1,586)
Balance at June 30, 2020 50,050 15,929 17,176 904 84,059

11 Derivative Financial instruments

Fuel derivatives

During the six months ended June 30, 2020, the Company entered into additional forward contracts for the purchase of 60,885,000 litres of fuel oil and 42,163,000 litres of gas oil with settlements scheduled between May 2020 and May 2022. These derivative instruments were not designated as hedges by the Company and are being recorded at fair value through profit and loss ("FVTPL").

B2GOLD CORP.

NOTES TO THE CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS

For the six months ended June 30, 2020

(All tabular amounts are in thousands of United States dollars unless otherwise stated)

(Unaudited)

The following is a summary, by maturity dates, of the Company’s fuel derivatives contracts outstanding as at June 30, 2020:

2020 2021 2022 Total
Forward – fuel oil:
Litres (thousands) 20,525 31,823 10,880 63,228
Average strike price $ 0.26 $ 0.24 $ 0.26 $ 0.25
Forward – gas oil:
Litres (thousands) 17,760 25,014 9,271 52,045
Average strike price $ 0.41 $ 0.33 $ 0.33 $ 0.36
Forward – diesel:
Litres (thousand) 757 — — 757
Average strike price $ 0.57 $ — $ — $ 0.57
Collars - fuel oil:
Litres (thousand) 10,399 11,055 — 21,454
Average ceiling price $ 0.26 $ 0.26 $ — $ 0.26
Average floor price $ 0.39 $ 0.39 $ — $ 0.39
Collars - gas oil:
Litres (thousand) 2,862 6,439 — 9,301
Average ceiling price $ 0.40 $ 0.40 $ — $ 0.40
Average floor price $ 0.57 $ 0.57 $ — $ 0.57

The unrealized fair value of these contracts at June 30, 2020 was $(4) million.

Interest Rate Swaps

On January 24, 2019, the Company entered into a series of interest swaps with a notional amount of $125 million with settlements scheduled between April 2019 and July 2021. Under these contracts, the Company receives a floating rate equal to the 3 month United States dollar LIBOR rate and pays a fixed rate of between 2.36% and 2.67%. These derivative instruments were not designated as hedges by the Company and are being recorded at FVTPL. The unrealized fair value of these contracts at June 30, 2020 was $(3) million.

12 Financial Instruments

The Company’s financial assets and liabilities are classified based on the lowest level of input significant to the fair value measurement based on the fair value hierarchy:

Level 1 – quoted prices in active markets for identical assets or liabilities;

Level 2 – inputs other than quoted prices included in Level 1 that are observable for the asset or liability, either directly (i.e. as prices) or indirectly (i.e. derived from prices); and

Level 3 – inputs for the asset or liability that are not based on observable market data.

B2GOLD CORP.

NOTES TO THE CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS

For the six months ended June 30, 2020

(All tabular amounts are in thousands of United States dollars unless otherwise stated)

(Unaudited)

As at June 30, 2020, the Company’s financial assets and liabilities that are measured and recognized at fair value on a recurring basis are categorized as follows:

As at June 30, 2020 As at December 31, 2019
Level 1 Level 2 Level 1 Level 2
$ $ $ $
Long-term investments (Note 7) 3,341 — 2,816 —
Long-term debt (Note 8) — (471,092) — (261,851)
Fuel derivative contracts (Note 11) — (3,805) — (1,292)
Interest rate swaps (Note 11) — (2,999) — (1,504)

The Company’s long-term investments consists of shares of publicly traded mining companies. The fair values of these were determined using market quotes from an active market for each investment.

The fair value of the Company's long-term debt, fuel derivative contracts and interest rate swaps were determined using prevailing market rates for instruments with similar characteristics.

The fair value of the Company's other financial instruments approximate their carrying value due to their short-term nature.

13 Income and other taxes

Income tax expense differs from the amount that would result from applying the Canadian federal and provincial income tax rates to earnings from operations before taxes. These differences result from the following items:

For the threemonths endedJune 30, 2020 For the threemonths endedJune 30, 2019 For the sixmonths endedJune 30, 2020 For the sixmonths endedJune 30, 2019
Income from continuing operations before taxes 210,908 68,143 370,795 141,027
Canadian federal and provincial income tax rates 27.00 27.00 27.00 27.00
Income tax expense at statutory rates 56,945 18,399 100,115 38,077
Increase (decrease) attributable to:
Effects of different foreign statutory tax rates 11,789 1,850 19,612 2,518
Non-deductible expenditures 8,526 6,889 16,285 13,751
Losses for which no tax benefit has been recorded 2,470 4,311 8,122 7,283
Benefit of optional tax deductions (3,343) (3,070) (6,283) (5,754)
Withholding tax 1,183 1,651 2,841 3,712
Change due to foreign exchange (6,131) (5,714) 8,848 2,368
Change in accruals for tax audits 1,000 — 1,000 —
Non-taxable portion of gains 508 — (356) —
Amounts over provided in prior years — (1,164) (358) (1,164)
Income tax expense 72,947 23,152 149,826 60,791
Current income tax, withholding and other taxes 82,229 24,123 145,699 49,692
Deferred income tax (recovery) expense (9,282) (971) 4,127 11,099
Income tax expense 72,947 23,152 149,826 60,791

All values are in US Dollars.

Included in current income tax expense for the three and six months ended June 30, 2020 is $13 million and $23 million, respectively (2019 - $4 million and $9 million, respectively) related to the State of Mali's 10% priority dividend on its free carried interest in the Fekola Mine. This priority dividend is accounted for as an income tax in accordance with IAS 12, Income Taxes.

B2GOLD CORP.

NOTES TO THE CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS

For the six months ended June 30, 2020

(All tabular amounts are in thousands of United States dollars unless otherwise stated)

(Unaudited)

The Gramalote Joint Venture received notice from the Colombian Tax Office (DIAN) that it disagreed with the Joint Venture’s tax treatment of certain items in the 2013 and 2014 income tax returns, resulting in assessments with additional income taxes and penalty fines. These assessments are currently being appealed by the Gramalote Joint Venture and the outcome of these appeals cannot be determined at this time. The Company does not believe that its share of any taxes payable under the assessments are material and no provision for any amounts that may be payable have been recorded at this time, pending the outcome of the appeal process.

14 Supplementary cash flow information

Supplementary disclosure of cash flow information is provided in the tables below:

Non-cash charges (credits):

For the three<br>months ended<br>June 30, 2020 For the three<br>months ended<br>June 30, 2019 For the six<br>months ended<br>June 30, 2020 For the six<br>months ended<br>June 30, 2019
$ $ $ $
Depreciation and depletion 75,582 56,981 146,194 117,612
Delivery into prepaid sales — (12,000) — (30,000)
Interest and financing expense 4,304 6,414 8,028 13,244
Share-based payments (Note 9) 7,440 6,054 11,087 10,036
Unrealized (gain) loss on derivative instruments (6,840) 4,613 4,008 (831)
Deferred income tax (recovery) expense (Note 13) (9,282) (971) 4,127 11,099
Share of (loss) income of associate 3,765 — (2,635) —
Write-down of mineral property interests — 1,352 — 1,352
Other (78) (176) 8,611 (3,222)
74,891 62,267 179,420 119,290

Changes in non-cash working capital:

For the three<br>months ended<br>June 30, 2020 For the three<br>months ended<br>June 30, 2019 For the six<br>months ended<br>June 30, 2020 For the six<br>months ended<br>June 30, 2019
$ $ $ $
Accounts receivable and prepaids 470 (1,390) 1,332 (7,824)
Value-added and other tax receivables (1,146) (230) (682) (2,571)
Inventories (7,640) (3,743) (16,327) (2,689)
Accounts payable and accrued liabilities (3,269) 1,354 (6,535) (8,166)
Current income and other taxes payable 40,143 (21,623) 82,513 (9,489)
28,558 (25,632) 60,301 (30,739)

B2GOLD CORP.

NOTES TO THE CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS

For the six months ended June 30, 2020

(All tabular amounts are in thousands of United States dollars unless otherwise stated)

(Unaudited)

Other exploration and development:

For the three<br>months ended<br>June 30, 2020 For the three<br>months ended<br>June 30, 2019 For the six<br>months ended<br>June 30, 2020 For the six<br>months ended<br>June 30, 2019
$ $ $ $
Fekola Mine, exploration (4,171) (6,215) (5,041) (8,310)
Masbate Mine, exploration (2,011) (1,103) (3,628) (2,065)
Otjikoto Mine, exploration (651) (533) (1,023) (864)
Anaconda Regional, exploration (2,472) (710) (5,326) (948)
Toega Project, exploration 563 (682) (117) (1,153)
Kiaka Project, exploration (860) (1,442) (1,355) (1,922)
Ondundu Project, exploration (160) (530) (343) (737)
Finland Properties, exploration (424) (58) (798) (278)
Other (1,697) (1,290) (3,616) (2,907)
(11,883) (12,563) (21,247) (19,184)

Non-cash investing and financing activities:

For the three<br>months ended<br>June 30, 2020 For the three<br>months ended<br>June 30, 2019 For the six<br>months ended<br>June 30, 2020 For the six<br>months ended<br>June 30, 2019
$ $ $ $
Interest on loan to non-controlling interest 938 868 1,871 1,726
Share-based payments, capitalized to mineral property interests 161 462 319 942
Change in current liabilities relating to mineral property expenditures (1,797) 188 (717) (46)
Foreign exchange (loss) gain on Fekola equipment loan facility (792) (753) 72 417

For the three and six ended June 30, 2020, the Company paid $36 million and $50 million, respectively, of income taxes in cash (2019 - $45 million and $52 million, respectively).

B2GOLD CORP.

NOTES TO THE CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS

For the six months ended June 30, 2020

(All tabular amounts are in thousands of United States dollars unless otherwise stated)

(Unaudited)

15 Segmented Information

The Company’s reportable operating segments for 2020 include its mining operations, namely the Fekola, Masbate and Otjikoto mines. The “Other Mineral Properties” segment consists of the Company’s interests in mineral properties which are at various stages of exploration and development, including the Company's interests in the Gramalote Project and Calibre. The “Corporate and Other” segment includes corporate operations.

For 2019, prior to the sale to Calibre, the Company's interest in El Limon and La Libertad mines were accounted for as discontinued operations.

The Company’s segments are summarized in the following tables:

For the three months ended June 30, 2020
Fekola<br>Mine Masbate<br>Mine Otjikoto<br>Mine Other<br>Mineral<br>Properties Corporate<br>& Other Total
$ $ $ $ $ $
External gold revenue 285,780 75,580 80,579 — — 441,939
Production costs 45,220 32,201 19,566 — — 96,987
Depreciation & depletion 41,474 12,619 21,489 — 207 75,789
Net income (loss) 115,144 19,458 19,332 (3,458) (12,515) 137,961
Capital expenditures 56,511 6,540 11,571 6,020 21 80,663
Total assets 1,431,586 668,845 436,545 321,819 387,508 3,246,303
For the three months ended June 30, 2019
--- --- --- --- --- --- --- --- --- ---
Fekola<br>Mine Masbate<br>Mine Otjikoto<br>Mine Limon<br>Mine Libertad<br>Mine Other<br>Mineral<br>Properties Corporate<br>& Other Discont. Operations Total
$ $ $ $ $ $ $ $ $
External gold revenue 140,289 81,469 46,462 6,259 23,768 — 12,000 (43,034) 267,213
Intersegment gold revenue — — — 6,549 6,458 — (13,007) — —
Production costs 39,596 35,130 20,587 9,531 23,477 — — (33,008) 95,313
Depreciation & depletion 27,760 14,102 15,119 5,170 2,308 — 242 (7,478) 57,223
Net income (loss) 38,877 21,381 5,543 (4,145) 546 (1,182) (19,698) — 41,322
Capital expenditures 19,044 8,623 17,754 11,681 11,304 5,527 66 — 73,999
Total assets 1,171,170 533,838 438,377 97,918 67,980 239,156 47,672 — 2,596,111
For the six months ended June 30, 2020
--- --- --- --- --- --- ---
Fekola<br>Mine Masbate<br>Mine Otjikoto<br>Mine Other<br>Mineral<br>Properties Corporate<br>& Other Total
$ $ $ $ $ $
External gold revenue 525,406 149,994 146,837 — — 822,237
Production costs 88,321 63,211 37,011 — — 188,543
Depreciation & depletion 80,689 25,177 40,328 — 461 146,655
Net income (loss) 200,553 38,674 20,434 2,217 (40,909) 220,969
Capital expenditures 131,514 12,918 23,675 25,203 61 193,371
Total assets 1,431,586 668,845 436,545 321,819 387,508 3,246,303

B2GOLD CORP.

NOTES TO THE CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS

For the six months ended June 30, 2020

(All tabular amounts are in thousands of United States dollars unless otherwise stated)

(Unaudited)

For the six months ended June 30, 2019
Fekola Mine Masbate Mine Otjikoto Mine Limon Mine Libertad Mine Other Mineral Properties Corporate & Other Discont. Operations Total
$ $ $ $ $ $ $ $ $
External gold revenue 291,774 147,296 95,066 11,249 36,526 — 30,000 (80,716) 531,195
Intersegment gold revenue — — — 16,532 16,409 — (32,941) — —
Production costs 85,624 62,647 39,879 20,833 45,840 — — (66,673) 188,150
Depreciation & depletion 58,013 27,095 32,504 8,391 5,846 — 479 (14,237) 118,091
Net income (loss) 71,477 37,122 7,558 (6,541) (5,733) (1,692) (34,346) — 67,845
Capital expenditures 42,423 18,029 25,367 19,575 16,801 10,084 217 — 132,496
Total assets 1,171,170 533,838 438,377 97,918 67,980 239,156 47,672 — 2,596,111

The Company’s mining interests are located in the following geographical locations:

June 30, 2020 December 31, 2019
$ $
Mining interests
Mali 1,146,355 1,094,998
Philippines 511,135 519,802
Namibia 312,551 325,366
Colombia 96,976 87,495
Burkina Faso 83,069 79,087
Nicaragua 56,106 53,471
Finland 7,495 6,697
Canada 1,760 2,160
Other 11,053 8,391
2,226,500 2,177,467

16 Commitments

As at June 30, 2020, the Company had the following commitments (in addition to those disclosed elsewhere in these financial statements):

•For payments at the Fekola Mine of $10 million related to mobile equipment rebuilds, $6 million for mobile equipment for the mine expansion, $3 million related to the solar plant, $3 million for the plant expansion and $3 million related to other smaller projects, all of which are expected to be incurred in 2020.

•For payments of $4 million for the Company's share of development costs at the Gramalote Project, all of which is expected to be incurred in 2020.

•For payments of $1 million for development of the Wolfshag underground at the Otjikoto Mine, all of which is expected to be incurred in 2020.

•For payments of $2 million for the purchase of mobile equipment, $1 million for mobile rebuilds, $1 million for process plant repairs and $1 million for upgrades to the tailings storage facility at the Masbate Mine, all of which is expected to be incurred in 2020.

B2GOLD CORP.

MINING INTERESTS SCHEDULE (NOTE 17)

For the six months ended June 30, 2020

(All tabular amounts are in thousands of United States dollars)

(Unaudited)

Cost Net carrying value
Balance at Dec. 31, 2019 Additions Disposals / write-offs Reclass Balance at Jun. 30, 2020 Balance at Dec. 31, 2019 Depreciation Disposals / write-offs Balance at Jun. 30, 2020 Balance at Jun. 30, 2020 Balance at Dec. 31, 2019
$ $ $ $ $ $ $ $ $ $
Property, plant and equipment (depletable)
Fekola 1,322,865 136,577 (20) — 1,459,422 (258,580) (89,699) 19 (348,260) 1,111,162 1,064,285
Masbate 815,418 18,306 (130) — 833,594 (295,616) (26,960) 117 (322,459) 511,135 519,802
Otjikoto 638,664 27,095 (19,007) — 646,752 (323,152) (40,248) 18,904 (344,496) 302,256 315,512
2,776,947 181,978 (19,157) — 2,939,768 (877,348) (156,907) 19,040 (1,015,215) 1,924,553 1,899,599
Exploration & evaluation properties (non-depletable)
Gramalote — — — 86,746 86,746 — — — — 86,746 —
Kiaka 76,807 2,119 — — 78,926 — — — — 78,926 76,807
Anaconda Regional 27,139 4,204 — — 31,343 — — — — 31,343 27,139
Mocoa Royalty 10,230 — — — 10,230 — — — — 10,230 10,230
Ondundu 9,778 343 — — 10,121 — — — — 10,121 9,778
Finland 6,697 798 — — 7,495 — — — — 7,495 6,697
Other 14,321 4,899 — — 19,220 — — — — 19,220 14,321
144,972 12,363 — 86,746 244,081 — — — — 244,081 144,972
Corporate
Office, furniture & equipment 4,971 61 — — 5,032 (2,811) (461) — (3,272) 1,760 2,160
2,926,890 194,402 (19,157) 86,746 3,188,881 (880,159) (157,368) 19,040 (1,018,487) 2,170,394 2,046,731
Investments in joint ventures (accounted for using the equity method)
Gramalote 77,265 13,124 — (90,389) — — — — — — 77,265
Calibre 53,471 2,635 — — 56,106 — — — — 56,106 53,471
130,736 15,759 — (90,389) 56,106 — — — — 56,106 130,736
3,057,626 210,161 (19,157) (3,643) 3,244,987 (880,159) (157,368) 19,040 (1,018,487) 2,226,500 2,177,467

All values are in US Dollars.

B2GOLD CORP.

MINING INTERESTS SCHEDULE (NOTE 17)

For the year ended December 31, 2019

(All tabular amounts are in thousands of United States dollars)

(Unaudited)

Cost Net carrying value
Balance at Dec. 31, 2018 Additions Disposals / write-offs Reclass / impairment reversal Balance at Dec. 31, 2019 Balance at Dec. 31, 2018 Depreciation Disposals/ write-offs Balance at Dec. 31, 2019 Balance at Dec. 31, 2019 Balance at Dec. 31, 2018
$ $ $ $ $ $ $ $ $ $
Property, plant and equipment (depletable)
Fekola 1,168,491 156,894 (2,520) — 1,322,865 (144,335) (115,676) 1,431 (258,580) 1,064,285 1,024,156
Masbate 681,509 40,867 (7,435) 100,477 815,418 (248,021) (51,859) 4,264 (295,616) 519,802 433,488
Otjikoto 575,127 64,266 (729) — 638,664 (238,579) (85,288) 715 (323,152) 315,512 336,548
Limon 217,263 35,099 (252,362) — — (149,541) (10,608) 160,149 — — 67,722
Libertad 315,569 20,721 (336,290) — — (295,715) (5,712) 301,427 — — 19,854
2,957,959 317,847 (599,336) 100,477 2,776,947 (1,076,191) (269,143) 467,986 (877,348) 1,899,599 1,881,768
Exploration & evaluation properties (non-depletable)
Kiaka 73,173 3,634 — — 76,807 — — — — 76,807 73,173
Anaconda Regional 21,903 5,236 — — 27,139 — — — — 27,139 21,903
Toega 19,581 2,440 — (22,021) — — — — — — 19,581
Mocoa Royalty 10,230 — — — 10,230 — — — — 10,230 10,230
Ondundu 8,273 1,505 — — 9,778 — — — — 9,778 8,273
Finland 5,947 750 — — 6,697 — — — — 6,697 5,947
Other 13,542 8,557 (7,778) — 14,321 — — — — 14,321 13,542
152,649 22,122 (7,778) (22,021) 144,972 — — — — 144,972 152,649
Corporate
Office, furniture & equipment 2,518 2,453 — — 4,971 (1,838) (973) — (2,811) 2,160 680
3,113,126 342,422 (607,114) 78,456 2,926,890 (1,078,029) (270,116) 467,986 (880,159) 2,046,731 2,035,097
Investments in joint ventures and associates (accounted for using the equity method)
Gramalote 72,078 5,187 — — 77,265 — — — — 77,265 72,078
Calibre — 51,050 — 2,421 53,471 — — — — 53,471 —
72,078 56,237 — 2,421 130,736 — — — — 130,736 72,078
3,185,204 398,659 (607,114) 80,877 3,057,626 (1,078,029) (270,116) 467,986 (880,159) 2,177,467 2,107,175

All values are in US Dollars.

16

Document

B2GOLD CORP.

MANAGEMENT’S DISCUSSION AND ANALYSIS

For the quarter ended June 30, 2020

This Management’s Discussion and Analysis (“MD&A”) has been prepared as at August 5, 2020 and contains certain “forward-looking information” and "forward-looking statements" under Canadian and United States securities laws, respectively ("forward-looking statements"). All statements included herein, other than statements of historical fact, including without limitation statements regarding potential mineralization, exploration results and future plans, production and objectives of B2Gold Corp. (the “Company” or “B2Gold”), are forward-looking statements that involve various risks, uncertainties and assumptions. See the “Caution on Forward-Looking Information” section. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements, as a result of a number of factors, including those set out in “Risks and Uncertainties.”

The following discussion of the operating results and financial position of the Company should be read in conjunction with the unaudited condensed interim consolidated financial statements and the notes thereto of the Company for the three and six months ended June 30, 2020, which have been prepared in accordance with International Accounting Standard 34 - Interim Financial Reporting of International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board (“IASB”) and the audited consolidated financial statements and the notes thereto of the Company for the year ended December 31, 2019. All amounts are expressed in United States dollars, unless otherwise stated. All production results and the Company's guidance presented in this MD&A reflect total production at the mines the Company operates on a 100% basis. Following the sale of La Libertad and El Limon to Calibre Mining Corp. ("Calibre") on October 15, 2019, production from these mines is presented on a 100% basis for the period up until October 14, 2019 and on a 34% basis thereafter, representing the Company’s indirect ownership interest in the Nicaraguan operations through its equity investment in Calibre (subject to reduction if B2Gold’s interest in Calibre dilutes).

Additional information related to B2Gold, including the Annual Information Form, is available on SEDAR at www.sedar.com.

INDEX
Overview 2
Review of Financial Results 5
Review of Mining Operations and Development Projects 10
Liquidity and Capital Resources 16
Critical Accounting Estimates 20
Risks and Uncertainties 21
Internal Control Over Financial Reporting 21
Non-IFRS Measures 22
Summary of Quarterly Results 34
Summary and Outlook 34
Outstanding Share Data 35
Caution on Forward-Looking Information 35

OVERVIEW

B2Gold is a Vancouver-based gold producer with three operating mines: the Fekola Mine in Mali, the Masbate Mine in the Philippines and the Otjikoto Mine in Namibia. Up to October 14, 2019, the Company operated two additional mines in Nicaragua - La Libertad and El Limon mines. The Company also has a 50% interest in the Gramalote Project in Colombia and an 81% interest in the Kiaka Project in Burkina Faso. In addition, the Company has a portfolio of other evaluation and exploration projects in Mali, Burkina Faso, Namibia, Uzbekistan and Finland.

COVID-19

The Company has been monitoring the COVID-19 pandemic and the potential impact at B2Gold's operations since mid-February 2020. B2Gold places the safety and well-being of its workforce as the highest priority and continues to encourage input from all its stakeholders as the situation continues to evolve. The Company has implemented several measures and introduced additional precautionary steps to manage and respond to the risks associated with COVID-19 to ensure the safety of B2Gold's employees, contractors, suppliers and surrounding communities where the Company works while continuing to operate. The Company is continually updating the plan and response measures based on the safety and well-being of its workforce, the severity of the pandemic in areas where it operates, global response measures, government restrictions and extensive community consultation. The Company is working closely with national and local authorities and continues to closely monitor each site's situation, including public and employee sentiment to ensure that stakeholders are in alignment with continued operation, while ensuring the safe operation of its mines.

Mining and milling operations have continued at the Fekola Mine in Mali and the Otjikoto Mine in Namibia, while due to a temporary fuel shortage, the Masbate Mine briefly suspended mining activities from March 22 to March 29, 2020, during which time the milling operations continued normally, processing ore from stockpiles. The Masbate Mine resumed mining operations using an estimated 50% of the mining fleet on March 29, 2020 with fleet activity returning to budgeted levels in May 2020. The Company also continues to progress its expansion and development projects with some restrictions and delays being experienced by individual projects.

On March 30, 2020 B2Gold announced that at the Gramalote Project, infill drilling of the Inferred Mineral Resource area would be temporarily suspended due to COVID-19, while other aspects of the Feasibility Study would continue to advance. The decision was taken in conjunction with the National Emergency and National Quarantine announced by the Colombian government and after consultation with surrounding communities and various levels of Colombian government. Operations restarted on May 4, 2020 for Environmental Impact Assessment related field activities, with exploration drilling recommencing on May 11, 2020. During the shutdown, other aspects of the Feasibility Study such as mine engineering review, metallurgical investigations and process plant design development continued to advance. Ongoing exploration work continues with a focus on infill drilling of the Inferred Mineral Resource area, which is expected to be completed in August 2020. As previously announced, the Company now expects to complete the Feasibility Study in the first quarter of 2021.

Basis of Presentation - Nicaraguan Assets - Discontinued Operations

On October 15, 2019, B2Gold completed the sale of the producing El Limon and La Libertad gold mines, the Pavon gold project and additional mineral concessions in Nicaragua (collectively, the "Nicaraguan Assets") to Calibre for aggregate consideration of $100 million (consisting of a combination of cash, common shares and a convertible debenture) (the “Calibre Transaction”), subject to an additional final payment for closing working capital of $18 million. As a result of closing the Calibre Transaction and the Calibre common shares subsequently issued to B2Gold upon the conversion of the convertible debenture in November 2019, the Company now holds approximately 34% of the total issued and outstanding Calibre common shares. B2Gold’s ongoing commitment to continuing involvement with the Nicaraguan operations is secured by its significant equity interest in Calibre, its right to appoint one director to the Board of Calibre and its participation in an Advisory Board of Calibre.

The comparative results for the three and six months ended June 30, 2019 account for the Nicaraguan Assets as discontinued operations in accordance with IFRS 5, Non-current assets held for sale and discontinued operations. The results of the Nicaraguan Assets have been presented as discontinued operations for all periods in the Condensed Interim Consolidated Statement of Operations and the Condensed Interim Consolidated Statements of Cash Flows. Commencing October 15, 2019, the Company no longer consolidates the results of the Nicaraguan Assets in its consolidated financial statements, but uses the equity method to account for its 34% ownership interest in Calibre. In addition, commencing October 15, 2019, B2Gold reports its attributable share of Calibre's production, cash costs and all-in sustaining costs in the Company's consolidated Non-IFRS measures.

Summary

Consolidated gold revenue in the second quarter of 2020 was a quarterly record of $442 million from the Company’s three operating mines on sales of 257,100 ounces at an average price of $1,719 per ounce compared to $267 million on sales of 203,700 ounces at an average price of $1,312 per ounce in the second quarter of 2019 (excluding discontinued operations). Compared to the second quarter of 2019, the significant increase in consolidated gold revenue of 65% ($175 million) was mainly attributable to a 31% increase in the average realized gold price and a 26% increase in gold ounces sold (due to the higher gold production and timing of gold sales). Consolidated gold revenue for the first half of 2020 was a half-year record of $822 million on sales of 496,600 ounces at an average price of $1,656 per ounce compared to $531 million on sales of 407,100 ounces at an average price of $1,305 per ounce in the first half of 2019 (excluding discontinued operations). The significant increase in

consolidated gold revenue of 55% ($291 million) was mainly attributable to a 27% increase in the average realized gold price and a 22% increase in gold ounces sold. Despite the disruptions caused by the COVID-19 pandemic since March 2020, the Company continues to successfully ship its gold bullion inventory to refineries. For accounting purposes, gold revenues earned from El Limon and La Libertad mines in 2019 are excluded from consolidated gold revenue and are included in the "Loss from discontinued operations" line in the Condensed Interim Consolidated Statement of Operations.

Consolidated gold production in the second quarter of 2020 was 239,574 ounces, above budget by 3% (7,327 ounces) and a significant increase of 15% (30,684 ounces) over the second quarter of 2019 (excluding discontinued operations) with solid performances from all the Company’s operations (refer to “Review of Mining Operations and Development Projects" section below). The significant increase in gold production over the second quarter of 2019 was driven by the Fekola Mine in Mali which continued its strong operational performance with gold production of 147,424 ounces, above budget by 5% (6,424 ounces), and 29% (33,527 ounces) higher compared to the second quarter of 2019. Fekola’s significant increase in gold production over the second quarter of 2019 was mainly due to the expansion of the Fekola mining fleet and optimization of the pit designs and mine plan for 2020, which have provided access to higher grade portions of the Fekola deposit earlier than anticipated in previous mine plans. The Otjikoto Mine in Namibia also had a solid second quarter, producing 43,496 ounces of gold, 3% (1,342 ounces) above budget, and 16% (6,075 ounces) higher compared to the second quarter of 2019. The Masbate Mine in the Philippines continued to perform well through the second quarter of 2020, despite being limited by a reduced workforce due to COVID-19 restrictions, producing 48,654 ounces of gold, approximately in-line with budget. Including attributable ounces from Calibre (2,019 ounces), the Company’s total gold production in the second quarter of 2020 was 241,593 ounces. Consolidated gold production for the first half of 2020 was a half-year record of 490,206 ounces, 5% (23,483 ounces) above budget and 20% (80,774 ounces) higher than the first half of 2019 (excluding discontinued operations). Including attributable ounces from Calibre (16,249 ounces), the Company’s total gold production in the first half of 2020 was 506,455 ounces.

In the second quarter of 2020, consolidated cash operating costs^1^ were $385 per gold ounce produced ($377 per gold ounce sold), $30 (7%) less per gold ounce produced than budget and $71 (16%) less per gold ounce produced than the second quarter of 2019 (excluding discontinued operations). Including estimated attributable results for Calibre, cash operating costs for the second quarter of 2020 were $390 per gold ounce produced ($383 per gold ounce sold), $42 (10%) less per gold ounce produced than budget and $139 (26%) less per gold ounce produced than the second quarter of 2019. For the first half of 2020, consolidated cash operating costs were $376 per gold ounce produced ($380 per gold ounce sold), $42 per gold ounce produced or 10% less than budget and $79 per gold ounce produced or 17% lower than the first half of 2019 (excluding discontinued operations). Including estimated attributable results for Calibre, cash operating costs for the first half of 2020 were $390 per gold ounce produced ($394 per gold ounce sold), $45 per gold ounce produced or 10% less than budget and $148 per gold ounce produced or 28% lower than the first half of 2019. The favourable budget variance and prior period variance for the second quarter of 2020 and the first half of 2020 were attributable to the strong operating results from all of the Company's operations with above budgeted gold production and lower than budgeted total cash operating costs.

Consolidated all-in sustaining costs^2^ for the second quarter of 2020 were $714 per gold ounce sold compared to budget of $807 per gold ounce sold and $807 per gold ounce sold for the second quarter of 2019 (excluding discontinued operations). Including estimated attributable results for Calibre, all-in sustaining costs for the second quarter of 2020 were $712 per gold ounce sold compared to budget of $819 per gold ounce sold and $914 per gold ounce sold for the second quarter of 2019. The lower than budgeted all-in sustaining costs in the second quarter of 2020 reflect the lower cash operating costs described above, lower general and administrative costs, higher than budgeted gold ounces sold and lower than budgeted sustaining capital and exploration expenditures. All-in sustaining costs for the first half of 2020 were $705 per gold ounce sold compared to budget of $806 per gold ounce sold and $775 per gold ounce sold for the first half of 2019. Including estimated attributable results for Calibre, all-in sustaining costs^^for the first half of 2020 were $717 per gold ounce sold compared to budget of $821 per gold ounce sold and $882 per gold ounce sold for the first half of 2019. The lower than budgeted all-in sustaining costs in the first half of 2020 reflect the lower cash operating costs described above, lower general and administrative costs, higher than budgeted gold ounces sold and lower than budgeted sustaining capital and exploration expenditures ($34 million). The lower sustaining capital and exploration expenditures are mainly a result of timing of expenditures and are expected to be incurred later in 2020, with the exception of approximately $8 million relating to the Fekola tailings storage facility project and Otjikoto prestripping, which are not expected to be incurred in 2020.

Based on current assumptions, B2Gold remains well positioned for continued strong operational and financial performance in 2020. On June 24, 2020, Calibre provided revised reduced 2020 production guidance following the temporary suspension of its Nicaraguan operations due to COVID-19. The Company’s attributable gold production from Calibre is now estimated to be between 37,000 and 42,000 ounces for 2020 (or 8,000 ounces lower than the original estimate of between 45,000 and 50,000 ounces of gold). However, given that the Company’s three operating mines were 23,483 ounces ahead of budget at the end of the first half of 2020, the Company continues to maintain its overall total consolidated production and financial guidance. Therefore, total consolidated production guidance remains at between 1,000,000 and 1,055,000 ounces of gold; total consolidated cash operating costs are forecast to be between $415 and $455 per ounce and total consolidated all-in sustaining costs are forecast to be between $780 and $820 per ounce.

^1^ "Cash operating costs” a non-IFRS measure; for a reconciliation from this measure to the most directly comparable measure specified, defined or determined under IFRS and presented in our financial statements, refer to “Non-IFRS Measures”

^2^ “All-in sustaining costs” is a non-IFRS measure; for a reconciliation from this measure to the most directly comparable measure specified, defined or determined under IFRS and presented in our financial statements, refer to “Non-IFRS Measures”

Net income for the second quarter of 2020 was $138 million compared to $41 million for the second quarter of 2019. For the second quarter of 2020, the Company generated net income attributable to the shareholders of the Company of $124 million ($0.12 per share) compared to $38 million ($0.04 per share) in the second quarter of 2019. Adjusted net income attributable to shareholders of the Company^3^for the second quarter of 2020 was $119 million ($0.11 per share) compared to $49 million ($0.05 per share) in the second quarter of 2019. For the first half of 2020, the Company generated net income of $221 million compared to a net income of $68 million in the first half of 2019. For the first half of 2020, the Company generated net income attributable to the shareholders of the Company of $197 million ($0.19 per share) compared to $60 million ($0.06 per share) in the first half of 2019. Adjusted net income attributable to the shareholders of the Company for the first half of 2020 was $218 million ($0.21 per share) compared to adjusted net income of $80 million ($0.08 per share) in the first half of 2019.

Cash flow provided by operating activities was a quarterly record of $238 million in the second quarter of 2020 compared to $93 million in the second quarter of 2019, an increase of $145 million due mainly to higher revenues of $175 million. Cash flow provided by operating activities was $454 million in the first half of 2020 compared to $179 million in the first half of 2019, an increase of $275 million due mainly to higher revenues of $291 million. Based on current assumptions, including a gold price of $1,700 per ounce for the remainder of 2020, the Company now expects to make total cash income tax payments in 2020 of approximately $178 million, an increase of $33 million from the previous first quarter of 2020 estimate, based on changes in realized gold price assumptions and expected payment timing.

B2Gold continues to maintain a strong financial position and liquidity. At June 30, 2020, the Company is in a net cash position of $157 million, with its cash and cash equivalents of $628 million (December 31, 2019 - $141 million) exceeding its total debt balances of $471 million. Working capital as at June 30, 2020 was $656 million compared to $242 million at December 31, 2019. As at June 30, 2020, the Company had drawn $425 million under the $600 million revolving credit facility ("RCF").

On April 8, 2020, as a precautionary measure and given the current uncertainty resulting from the COVID-19 pandemic, the Company completed the drawdown of a further $250 million on its $600 million RCF, resulting in a total revised drawn balance of $425 million and available undrawn capacity of $175 million. The $250 million drawn in April 2020 was to provide additional liquidity flexibility and assurance until the ultimate timing and outcome of the COVID-19 pandemic could be reasonably determined.

Based on current assumptions, including the continued strong operating performance at each of the Company's mines and no significant unforeseen work stoppages having been incurred due to COVID-19, the Company now intends to repay the entire drawn balance of $425 million under its RCF by the end of the third quarter of 2020 and finish 2020 in a strong cash position.

On January 1, 2020, B2Gold assumed the manager role of the Gramalote Project. On January 21, 2020, the Company announced positive results from the Updated Preliminary Economic Assessment for the Gramalote Ridge deposit (“Gramalote Ridge”) at the Gramalote Project (the "Gramalote PEA"). Subsequent to the second quarter of 2020, the Company completed its sole funding requirement (refer to "Gramalote Project - Joint Venture with AngloGold Ashanti Limited - Colombia" section below).

On January 16, 2020, the Company announced an updated Fekola Mineral Resource estimate including a substantial increase in Indicated Mineral Resources at the Fekola Mine following a successful infill drill program in 2019.

On February 27, 2020, B2Gold’s Board of Directors (the "Board") declared a quarterly cash dividend of $0.01 per common share, paid on March 23, 2020 to shareholders of record as of March 9, 2020.

On April 28, 2020, the Company and its 10% partner GAMS-Mining F&I Ltd ("GAMS") entered into a definitive agreement with West African Resources Limited ("West African") for the sale of the Toega project located in Burkina Faso. The purchase consideration, due 90% to B2Gold and 10% to GAMS, consists of: an initial non-refundable cash payment of $10 million; a further payment of $10 million in cash or shares due upon completion of a feasibility study within 2 years (at which time the permits comprising the Toega project will be transferred to West African); production payments of $25 million in the form of a 3% net smelter returns ("NSR") royalty on production from the Toega project area; and a further 0.5% NSR royalty (to commence after the 3% NSR outlined above has been fully paid) which is capped at 1.5 million ounces.

On June 11, 2020, the Board declared a quarterly cash dividend of $0.02 per common share, an increase of 100%, paid on July 7, 2020 to shareholders of record as of June 23, 2020. The declaration and payment of future quarterly dividends remains at the discretion of the Board and will depend on the Company's financial results, cash requirements, future prospects and other factors deemed relevant by the Board. In light of the current higher gold price environment, the Company's strong operational performance and the fact that the Company has now reached a net positive cash position, the Board has decided to increase the quarterly dividend to $0.04 per share (or an expected $0.16 per share on an annual basis), which will become effective upon approval and declaration of the third quarter dividend. This represents a further 100% increase from the second quarter of 2020 dividend and four times higher than the initial quarterly dividend of $0.01 per share declared in the fourth quarter of 2019. The declaration and payment of future quarterly dividends remains at the discretion of the Board and will depend on the Company's financial results, cash requirements, future prospects and other factors deemed relevant by the Board.

^3^ “Adjusted net income attributable to shareholders of the Company” is a non-IFRS measure; for a reconciliation from this measure to the most directly comparable measure specified, defined or determined under IFRS and presented in our financial statements, refer to “Non-IFRS Measures”

REVIEW OF FINANCIAL RESULTS

Selected Quarterly Financial and Operating Results

Three months ended Six months ended
June 30, June 30,
2020 2019 2020 2019
Gold revenue ($ in thousands) 441,939 267,213 822,237 531,195
Net income from continuing operations ($ in thousands) 137,961 44,991 220,969 80,236
Net loss from discontinued operations ($ in thousands) — (3,669) — (12,391)
Net income ($ in thousands) 137,961 41,322 220,969 67,845
Earnings per share from continuing operations – basic^(1)^ ($/ share) 0.12 0.04 0.19 0.07
Earnings per share from continuing operations – diluted^(1)^ ($/ share) 0.12 0.04 0.19 0.07
Earnings per share – basic^(1)^ ($/ share) 0.12 0.04 0.19 0.06
Earnings per share – diluted^(1)^ ($/ share) 0.12 0.04 0.19 0.06
Cash provided by operating activities of continuing operations<br>($ thousands) 238,089 83,382 454,302 168,580
Cash provided by operating activities of discontinued operations<br>($ thousands) — 9,434 — 10,654
Cash provided by operating activities ($ in thousands) 238,089 92,816 454,302 179,234
Average realized gold price ($/ ounce) 1,719 1,312 1,656 1,305
Adjusted net income^(1)(2)^ ($ in thousands) 119,084 48,640 217,973 80,218
Adjusted earnings per share^(1)(2)^ – basic ($) 0.11 0.05 0.21 0.08
Excluding El Limon and La Libertad discontinued operations results:
Gold sold (ounces) 257,100 203,700 496,600 407,100
Gold produced (ounces) 239,574 208,890 490,206 409,432
Cash operating costs^(2)^ ($/ gold ounce sold) 377 468 380 462
Cash operating costs^(2)^ ($/ gold ounce produced) 385 456 376 455
Total cash costs^(2)^ ($/ gold ounce sold) 499 554 494 549
All-in sustaining costs^(2)^ ($/ gold ounce sold) 714 807 705 775
Including El Limon and La Libertad discontinued operations results, Equity investment in Calibre:
Gold sold (ounces) 258,722 236,282 512,452 468,358
Gold produced (ounces) 241,593 246,020 506,455 476,879
Cash operating costs^(2)^ ($/ gold ounce sold) 383 543 394 544
Cash operating costs^(2)^ ($/ gold ounce produced) 390 529 390 538
Total cash costs^(2)^ ($/ gold ounce sold) 498 624 507 626
All-in sustaining costs^(2)^ ($/ gold ounce sold) 712 914 717 882

^(1) Attributable to the shareholders of the Company.^

^(2) Non-IFRS measure. For a description of how these measures are calculated and a reconciliation of these measures to the most directly comparable measures specified, defined or determined under IFRS and presented in the Company’s financial statements, refer to “Non-IFRS Measures”.^

Second quarter 2020 and 2019

Revenue

Consolidated gold revenue in the second quarter of 2020 was a quarterly record of $442 million from the Company’s three operating mines on sales of 257,100 ounces at an average price of $1,719 per ounce compared to $267 million on sales of 203,700 ounces at an average price of $1,312 per ounce in the second quarter of 2019 (excluding discontinued operations). Compared to the second quarter of 2019, the significant increase in consolidated gold revenue of 65% ($175 million) was mainly attributable to a 31% increase in the average realized gold price and a 26% increase in gold ounces sold (due to the higher gold production and timing of gold sales). Despite the disruptions caused by the COVID-19 pandemic since March 2020, the Company continues to successfully ship its gold bullion inventory to refineries. For accounting purposes, gold revenues earned from El Limon and La Libertad mines in 2019 are excluded from consolidated gold revenue and are included in the "Loss from discontinued operations" line in the Condensed Interim Consolidated Statement of Operations.

Consolidated gold revenue for the second quarter of 2020 did not include any revenue relating to the delivery of gold into the Company's Prepaid Gold Sales contracts associated with the Company's Prepaid Gold Sales transactions as final delivery into

these contracts were in the second quarter of 2019. Consolidated gold revenue for the second quarter of 2019 included $12 million relating to the delivery of gold into the Company's Prepaid Gold Sales contracts.

In the second quarter of 2020, the Fekola Mine accounted for $286 million (Q2 2019 - $140 million) of gold revenue from the sale of 166,800 ounces (Q2 2019 - 106,200 ounces), the Masbate Mine accounted for $76 million (Q2 2019 - $81 million) of gold revenue from the sale of 43,500 ounces (Q2 2019 - 62,100 ounces) and the Otjikoto Mine accounted for $81 million (Q2 2019 - $46 million) of gold revenue from the sale of 46,800 ounces (Q2 2019 - 35,400 ounces). Excluded from gold revenue in the second quarter of 2019 was El Limon's gold revenue of $13 million from the sale of 9,791 ounces and La Libertad's gold revenue of $30 million from the sale of 22,791 ounces.

Production and operating costs

Consolidated gold production in the second quarter of 2020 was 239,574 ounces, above budget by 3% (7,327 ounces) and a significant increase of 15% (30,684 ounces) over the second quarter of 2019 (excluding discontinued operations) with solid performances from all the Company’s operations (refer to “Review of Mining Operations and Development Projects" section below). The significant increase in gold production over the second quarter of 2019 was driven by the Fekola Mine in Mali which continued its strong operational performance with gold production of 147,424 ounces, above budget by 5% (6,424 ounces), and 29% (33,527 ounces) higher compared to the second quarter of 2019. Fekola’s significant increase in gold production over the second quarter of 2019 was mainly due to the expansion of the Fekola mining fleet and optimization of the pit designs and mine plan for 2020, which have provided access to higher grade portions of the Fekola deposit earlier than anticipated in previous mine plans. The Otjikoto Mine in Namibia also had a solid second quarter, producing 43,496 ounces of gold, 3% (1,342 ounces) above budget, and 16% (6,075 ounces) higher compared to the second quarter of 2019. The Masbate Mine in the Philippines continued to perform well through the second quarter of 2020, despite being limited by a reduced workforce due to COVID-19 restrictions, producing 48,654 ounces of gold, approximately in-line with budget. Including attributable ounces from Calibre (2,019 ounces), the Company’s total gold production in the second quarter of 2020 was 241,593 ounces.

In the second quarter of 2020 consolidated cash operating costs (refer to "Non-IFRS Measures") were $385 per gold ounce produced ($377 per gold ounce sold), $30 (7%) less per gold ounce produced than budget and $71 (16%) less per gold ounce produced than the second quarter of 2019 (excluding discontinued operations). Including estimated attributable results for Calibre, cash operating costs for the second quarter of 2020 were $390 per gold ounce produced ($383 per gold ounce sold), $42 (10%) less per gold ounce produced than budget and $139 (26%) less per gold ounce produced than the second quarter of 2019. The favourable budget variance and prior period variance was attributable to the strong operating results from all of the Company's operations with above budget gold production and lower than budgeted total cash operating costs.

Consolidated all-in sustaining costs^^(refer to "Non-IFRS Measures")^^for the second quarter of 2020 were $714 per gold ounce sold compared to budget of $807 per gold ounce sold and $807 per gold ounce sold for the second quarter of 2019 (excluding discontinued operations). Including estimated attributable results for Calibre, all-in sustaining costs for the second quarter of 2020 were $712 per gold ounce sold compared to budget of $819 per gold ounce sold and $914 per gold ounce sold for the second quarter of 2019. The lower than budgeted all-in sustaining costs in the second quarter of 2020 reflect the lower cash operating costs described above, lower general and administrative costs, higher than budgeted gold ounces sold and lower than budgeted sustaining capital and exploration expenditures. The lower sustaining capital and exploration expenditures are mainly a result of timing of expenditures and are expected to be incurred later in 2020, with the exception of $8 million relating to the Fekola tailings storage facility project and Otjikoto prestripping, which are not expected to be incurred in 2020.

Depreciation and depletion

Depreciation and depletion expense included in total cost of sales was $76 million in the second quarter of 2020 compared to $57 million in the second quarter of 2019. The 33% increase in depreciation expense was primarily due to a 26% increase in the gold ounces sold and a 5% increase in the depreciation charge per ounce of gold sold.

Royalties and production taxes

Royalties and production taxes included in total cost of sales were $31 million for the second quarter of 2020 compared to $18 million for the second quarter of 2019. The 78% increase in royalties and production taxes resulted mainly from a 31% increase in the gold price realized in the second quarter of 2020, a 26% increase in gold ounces sold and a change in sales mix which reflects more sales from the Fekola Mine at a higher royalty rate and lower sales from the Masbate Mine with a lower royalty rate.

Other

General and administrative (“G&A”) costs relate primarily to the Company’s head office in Vancouver, the Bamako office in Mali, the Makati office in the Philippines and the Windhoek office in Namibia. G&A for the second quarter of 2020 was $8 million which was $4 million lower than the second quarter of 2019. The lower G&A in the second quarter of 2020 resulted from lower consulting, legal and travel expenses incurred due to COVID-19 restrictions.

Share-based payment expense for the second quarter of 2020 was $7 million, which was in-line with the second quarter of 2019.

For the second quarter of 2020, the Company's estimate of its share of Calibre's net loss was approximately $4 million, which includes an adjustment to reflect actual results from the first quarter of 2020. Calibre will report its financial results on August 11, 2020. The Company will update any differences in the third quarter of 2020.

Other operating expenses for the second quarter for 2020 were $4 million, which mainly consisted of COVID-19 relief donations of $3 million.

The Company reported $5 million in interest and financing expense during the second quarter of 2020 compared to $7 million in the second quarter of 2019. The lower interest and financing expense resulted from lower interest rates partially offset by higher debt levels in the second quarter of 2020 compared to the second quarter of 2019.

For the second quarter of 2020, the Company recorded derivative gains of $3 million compared to losses of $3 million in the second quarter of 2019. The gains were driven by fuel forward contracts and interest rate swap derivative instruments and consisted of unrealized gains of $7 million (Q2 2019 - unrealized losses of $5 million) and realized losses of $4 million (Q2 2019 - realized gains of $2 million).

For the second quarter of 2020, the Company recorded a net current income and other tax expense of $82 million compared to $24 million in the second quarter of 2019, consisting of current income tax of $68 million (Q2 2019 - $19 million), the 10% priority dividend to the State of Mali of $13 million (Q2 2019 - $4 million) and withholding tax (on intercompany interest/management fees) of $1 million (Q2 2019 - $1 million). The priority dividend is accounted for as an income tax in accordance with IAS 12, Income Taxes. Compared to the second quarter of 2019, current tax expense in the second quarter of 2020 was higher mainly as a result of higher taxable income and no tax loss deductions in the second quarter of 2020 as compared to the second quarter of 2019. The Otjikoto Mine became taxable in the first quarter for 2020 after using all of its loss carryforwards by the end of 2019. For the second quarter of 2020, the Company recorded a deferred income tax recovery of $9 million compared to a deferred income tax recovery of $1 million in the second quarter of 2019 mainly attributable to a strengthening of the local currencies in Mali and Namibia.

For the second quarter of 2019, the Company recorded a loss from discontinued operations of $4 million. The results from discontinued operations relate to El Limon and La Libertad mines, which were sold to Calibre on October 15, 2019.

Net income for the second quarter of 2020 was $138 million compared to $41 million for the second quarter of 2019. For the second quarter of 2020, the Company generated net income attributable to the shareholders of the Company of $124 million ($0.12 per share) compared to $38 million ($0.04 per share) in the second quarter of 2019. Adjusted net income attributable to shareholders of the Company^^(refer to “Non-IFRS Measures”) for the second quarter of 2020 was $119 million ($0.11 per share) compared to $49 million ($0.05 per share) in the second quarter of 2019. Adjusted net income in the second quarter of 2020 excluded share-based payments of $7 million, COVID-19 relief donations of $3 million, unrealized gains on derivative instruments of $7 million and a deferred income tax recovery of $9 million.

Cash flow provided by operating activities was a quarterly record of $238 million in the second quarter of 2020 compared to $93 million in the second quarter of 2019, an increase of $145 million due mainly to higher revenues of $175 million. Based on current assumptions, including a gold price of $1,700 per ounce for the remainder of 2020, the Company now expects to make total cash income tax payments in 2020 of approximately $178 million, an increase of $33 million from the previous first quarter of 2020 estimate, based on changes in realized gold price assumptions and expected payment timing.

B2Gold continues to maintain a strong financial position and liquidity. At June 30, 2020, the Company is in a net cash position of $157 million, with its cash and cash equivalents of $628 million (December 31, 2019 - $141 million) exceeding its total debt balances of $471 million. Working capital as at June 30, 2020 was $656 million compared to $242 million at December 31, 2019. As at June 30, 2020, the Company had drawn $425 million under the $600 million RCF.

On April 8, 2020, as a precautionary measure and given the current uncertainty resulting from the COVID-19 pandemic, the Company completed the drawdown of a further $250 million on its $600 million RCF, resulting in a total revised drawn balance of $425 million and available undrawn capacity of $175 million. The $250 million drawn in April 2020 was to provide additional liquidity flexibility and assurance until the ultimate timing and outcome of the COVID-19 pandemic could be reasonably determined.

Based on current assumptions, including the continued strong operating performance at each of the Company's mines and no significant unforeseen work stoppages having been incurred due to COVID-19, the Company now intends to repay the entire drawn balance of $425 million under its RCF by the end of the third quarter of 2020 and finish 2020 in a strong cash position.

Year-to-date results

Revenue

Consolidated gold revenue for the first half of 2020 was a half-year record of $822 million on sales of 496,600 ounces at an average price of $1,656 per ounce compared to $531 million on sales of 407,100 ounces at an average price of $1,305 per ounce in the first half of 2019 (excluding discontinued operations). The significant increase in consolidated gold revenue of 55% ($291 million) was mainly attributable to a 27% increase in the average realized gold price and a 22% increase in gold ounces sold.

Consolidated gold revenue for the first half of 2020 did not include any revenue relating to the delivery of gold into the Company's Prepaid Gold Sales contracts associated with the Company's Prepaid Gold Sales transactions as final delivery into these contracts were in the second quarter of 2019. Consolidated gold revenue for the first half of 2019 included $30 million relating to the delivery of gold into the Company's Prepaid Gold Sales contracts.

In the first half of 2020, the Fekola Mine accounted for $525 million (first half of 2019 - $292 million) of gold revenue from the sale of 317,500 ounces (first half of 2019 - 222,000 ounces), the Masbate Mine accounted for $150 million (first half of 2019 - $147 million) of gold revenue from the sale of 90,400 ounces (first half of 2019 -112,500 ounces) and the Otjikoto Mine accounted for $147 million (first half of 2019 - $95 million) of gold revenue from the sale of 88,700 ounces (first half of 2019 - 72,600 ounces). Excluded from gold revenue in the first half of 2019 was El Limon's gold revenue of $28 million from the sale of 21,195 ounces and La Libertad's gold revenue of $53 million from the sale of 40,063 ounces.

Production and operating costs

Consolidated gold production for the first half of 2020 was a half-year record of 490,206 ounces, 5% (23,483 ounces) above budget and 20% (80,774 ounces) higher than the first half of 2019 (excluding discontinued operations). Including attributable ounces from Calibre (16,249 ounces), the Company’s total gold production in the first half of 2020 was 506,455 ounces.

For the first half of 2020, consolidated cash operating costs (refer to "Non-IFRS Measures") were $376 per gold ounce produced ($380 per gold ounce sold), $42 per gold ounce produced or 10% less than budget and $79 per gold ounce produced or 17% lower than the first half of 2019 (excluding discontinued operations). Including estimated attributable results for Calibre, cash operating costs for the first half of 2020 were $390 per gold ounce produced ($394 per gold ounce sold), $45 per gold ounce produced or 10% less than budget and $148 per gold ounce produced or 28% lower than the first half of 2019. The variance from budget and the first half of 2019 was driven by the same factors as those for the second quarter of 2020 described earlier.

All-in sustaining costs (refer to "Non-IFRS Measures") for the first half of 2020 were $705 per gold ounce sold compared to budget of $806 per gold ounce sold and $775 per gold ounce sold for the first half of 2019. Including estimated attributable results for Calibre, all-in sustaining costs^^for the first half of 2020 were $717 per gold ounce sold compared to budget of $821 per gold ounce sold and $882 per gold ounce sold for the first half of 2019. The lower than budgeted all-in sustaining costs in the first half of 2020 reflect the lower cash operating costs described above, lower general and administrative costs, higher than budgeted ounces gold sold and lower than budgeted sustaining capital and exploration expenditures ($34 million). The lower sustaining capital and exploration expenditures are mainly a result of timing of expenditures and are expected to be incurred later in 2020, with the exception of $8 million of permanent savings.

Depreciation and depletion

Depreciation and depletion expense included in total cost of sales was $146 million for the first half of 2020 compared to $118 million in the first half of 2019. The 24% increase in depreciation expense was primarily due to a 22% increase in the gold ounces sold and a 2% increase in the depreciation charge per ounce of gold sold.

Royalties and production taxes

Royalties and production taxes included in total cost of sales were $57 million for the first half of 2020 compared to $36 million in the first half of 2019. The 60% increase in royalties and production taxes resulted mainly from a 27% increase in the gold price realized in 2020, a 22% increase in gold ounces sold and a change in sales mix which reflects more sales from the Fekola Mine at a higher royalty rate and lower sales from the Masbate Mine with a lower royalty rate.

Other

G&A was $18 million, which is $8 million lower than the first half of 2019. The lower G&A was due to lower bonuses in 2020 compared to 2019 as well as lower consulting, legal and travel expenses incurred in the first half of 2020 due to COVID-19 restrictions.

Share-based payment expense for the first half of 2020 was $11 million, which was comparable to the first half of 2019.

Community relations expense for the first half of 2020 was $4 million, which was $3 million higher than the first half of 2019, resulting from two significant donations in the first half of 2020: 1,000 ounces of gold, with a value of approximately $2 million, to

support black rhino conservation and the communities that protect them in Namibia and a $1 million contribution to the African School of Mines in Mali.

For the first half of 2020, the Company's estimate of its share of Calibre's net income was approximately $3 million. Calibre will report its financial results on August 11, 2020. The Company will update any differences in the third quarter of 2020.

Other operating expenses for the first half of 2020 were $4 million, which mainly consisted of COVID-19 relief donations of $3 million.

The Company reported $10 million in interest and financing expense during the first half of 2020 as compared with $15 million in the first half of 2019. The lower interest and financing expense resulted from lower interest rates in the first half of 2020 compared to the first half of 2019 partially offset by higher debt balances in the first half of 2020.

For the first half of 2020, the Company recorded derivative losses of $11 million compared to gains of $3 million in the first half of 2019. The losses were driven by fuel forward contracts and interest rate swap derivative instruments and consisted of unrealized losses of $4 million (first half of 2019 - unrealized gains of $1 million) and realized losses of $7 million (first half of 2019 - realized gains of $2 million).

For the first half of 2020, the Company recorded a net current income and other tax expense of $146 million compared to $50 million in the first half of 2019, consisting of current income tax of $119 million (first half of 2019 - $38 million), the 10% priority dividend to the State of Mali of $23 million (first half of 2019 - $8 million) and withholding tax (on intercompany interest/management fees) of $3 million (first half of 2019 - $4 million). The priority dividend is accounted for as an income tax in accordance with IAS 12, Income Taxes. Compared to the first half of 2019, current tax expense for the first half of 2020 was higher mainly as a result of higher income and lower tax loss deductions in the first half of 2020 versus the first half of 2019. The Otjikoto Mine became taxable in the first half of 2020 after using all of its loss carryforwards by the end of 2019. For the first half of 2020, the Company recorded a deferred income tax expense of $4 million compared to a deferred income tax expense of $11 million in the first half of 2019 mainly attributable to the weakening of local currency in Namibia in the first half of 2020 versus a slight strengthening in the first half of 2019 in relation to the US dollar. Changes in local currencies result in changes to the underlying book values of tax balance sheets for Mali and Namibia as tax filings are in local currencies.

For the first half of 2019, the Company recorded net loss from discontinued operations of $12 million. The results from discontinued operations relate to El Limon and La Libertad mines, which were sold to Calibre on October 15, 2019.

For the first half of 2020, the Company generated net income of $221 million compared to a net income of $68 million in the first half of 2019. For the first half of 2020, the Company generated net income attributable to the shareholders of the Company of $197 million ($0.19 per share) compared to $60 million ($0.06 per share) in the first half of 2019. Adjusted net income attributable to the shareholders of the Company^^(refer to “Non-IFRS Measures”) for the first half of 2020 was $218 million ($0.21 per share) compared to adjusted net income of $80 million ($0.08 per share) in the first half of 2019. Adjusted net income in the first half of 2020 excluded share-based payments of $11 million, COVID-19 relief donations of $3 million, unrealized losses on derivative instruments of $4 million and a deferred income tax expense of $3 million.

Cash flow provided by operating activities was $454 million in the first half of 2020 compared to $179 million in the first half of 2019, an increase of $275 million due mainly to higher revenues of $291 million. Based on current assumptions, including a gold price of $1,700 per ounce for the remainder of 2020, the Company now expects to make total cash income tax payments in 2020 of approximately $178 million, an increase of $33 million from the previous first quarter of 2020 estimate, based on changes in realized gold price assumptions and expected payment timing.

REVIEW OF MINING OPERATIONS AND DEVELOPMENT PROJECTS

Fekola Mine - Mali

Three months ended Six months ended
June 30, June 30,
2020 2019 2020 2019
Gold revenue ($ in thousands) 285,780 140,289 525,406 291,774
Gold sold (ounces) 166,800 106,200 317,500 222,000
Average realized gold price ($/ ounce) 1,713 1,321 1,655 1,314
Tonnes of ore milled 1,560,337 1,818,679 3,306,689 3,547,812
Grade (grams/ tonne) 3.11 2.07 3.11 2.09
Recovery (%) 94.8 94.4 94.4 94.3
Gold production (ounces) 147,424 113,897 311,435 224,246
Cash operating costs^(1)^ ($/ gold ounce sold) 271 373 278 386
Cash operating costs^(1)^ ($/ gold ounce produced) 300 367 274 375
Total cash costs^(1)^ ($/ gold ounce sold) 408 485 411 492
All-in sustaining costs^(1)^ ($/ gold ounce sold) 562 625 542 619
Capital expenditures ($ in thousands) 52,340 12,829 126,473 34,113
Exploration ($ in thousands) 4,171 6,215 5,041 8,310

^(1) Non-IFRS measure. For a description of how these measures are calculated and a reconciliation of these measures to the most directly comparable measures specified, defined or determined under IFRS and presented in the Company’s financial statements, refer to “Non-IFRS Measures”.^

The Fekola Mine in Mali (owned 80% by the Company and 20% by the State of Mali) continued its very strong operational performance with second quarter of 2020 gold production of 147,424 ounces, above budget by 5% (6,424 ounces), with processed throughput and recovery better than budget and head grade in-line with budget. Compared to the second quarter of 2019, gold production was significantly higher by 29% (33,527 ounces), mainly due to the expansion of the Fekola mining fleet and optimization of the pit designs and mine plan, which have provided access to higher grade portions of the Fekola deposit earlier than anticipated in previous mine plans. For the second quarter of 2020, mill feed grade was 3.11 grams per tonne (“g/t”) compared to budget of 3.10 g/t and 2.07 g/t in the second quarter of 2019; mill throughput was 1.56 million tonnes compared to budget of 1.52 million tonnes and 1.8 million tonnes in the second quarter of 2019 (lower in 2020 as a result of planned interruptions related to the ongoing mill expansion project); and gold recovery averaged 94.8% compared to budget of 93.0% and 94.4% in the second quarter of 2019. For the first half of 2020, the Fekola Mine produced 311,435 ounces of gold, above budget by 7% (20,435 ounces) and 39% (87,189 ounces) higher than the first half of 2019. For the first half of 2020, mill throughput was 3.3 million tonnes, in-line with budget and 7% lower than the first half of 2019. The average grade processed for the first half of 2020 was 3.11 g/t (compared to budget of 3.00 g/t) together with average gold recoveries of 94.4% (compared to budget of 93.5%).

The recent political unrest in Mali has not had a material impact on B2Gold’s operations. The Fekola Mine continues to operate as normal and the Company is maintaining both quarterly budgeted production and annual production guidance. B2Gold will continue to monitor the situation to ensure that its mining operations continue normally, providing important economic benefits both to the communities around the mine and to the Malian regional and national governments. B2Gold has enjoyed a positive relationship with the Government of Mali from the beginning of its investment in the country, including recently partnering with the government to assist the people of Mali in facing the challenges created by the COVID-19 pandemic and its impact on the mining sector. As one of the largest Canadian investors in Mali, B2Gold has enjoyed the strong support of the Government of Mali for our in-country investment.

The Fekola Mine’s cash operating costs (refer to “Non-IFRS Measures”) were $300 per gold ounce produced ($271 per gold ounce sold) for the second quarter of 2020, in-line with budget of $294 per gold ounce produced and $67 per gold ounce produced (18%) lower than the second quarter of 2019. The in-line cash operating costs per ounce produced for the second quarter of 2020 compared to budget resulted from the higher gold production described above coupled with production costs which were generally in-line with budget partially offsetting $4 million of unbudgeted COVID-19 related production costs ($30 per ounce produced) incurred during the quarter. Compared to the second quarter of 2019, cash operating costs for the second quarter of 2020 were lower due to the higher production in the second quarter of 2020 compared to the second quarter of 2019 as described above. For the first half of 2020, Fekola’s cash operating costs were below budget at $274 per ounce produced ($278 per gold ounce sold) compared to a budget of $292 per ounce produced, $18 per ounce produced (6%) below budget and $101 per ounce (27%) lower than the first half of 2019 for the same reasons as described for the second quarter above.

For the second quarter of 2020, the average diesel price was 5% lower than budget while the average HFO price was in-line with budget. Fuel costs in Mali are set by the Government one month in advance and contain a fixed price component for cross-border freight and clearance costs. In addition, Fekola typically has one to two months of inventory on hand at any point in time,

which is drawn down and included in operating costs and per ounce costs as that inventory is utilized. Therefore, reported diesel and HFO costs only partially mirror changes in underlying crude prices and usually with an approximately three month time lag.

All-in sustaining costs (refer to “Non-IFRS Measures”) for the second quarter of 2020 were $562 per gold ounce sold compared to a budget of $589 per gold ounce sold and $625 per gold ounce sold in the second quarter of 2019. The lower than budgeted all-in sustaining costs in the second quarter of 2020 reflect higher than budgeted gold ounces sold partially offset by higher royalties resulting from a higher average gold price realized than budgeted in the second quarter of 2020. For the first half of 2020, all-in sustaining costs for the Fekola Mine were $542 per gold ounce sold compared to a budget of $583 per gold ounce sold and $619 per gold ounce sold in the first half of 2019. All-in sustaining costs for the first half of 2020 were lower than budget as a result of the lower than budgeted cash operating costs as discussed above, higher than budgeted gold ounces sold and lower sustaining and exploration expenditures, partially offset by higher royalties resulting from a higher average gold price realized than budgeted in the first half of 2020. The lower sustaining capital and exploration expenditures are mainly a result of timing of expenditures and are expected to be incurred later in 2020, except for approximately $4 million of expected overall savings versus budget on the tailings storage facility project.

Capital expenditures in the second quarter of 2020 totalled $52 million primarily consisting of $13 million for mining fleet expansion, $13 million for process plant expansion, $7 million for the solar plant and $13 million for prestripping. Capital expenditures in the first half of 2020 totalled $126 million primarily consisting of $43 million for mining fleet expansion, $29 million for process plant expansion, $18 million for the solar plant and $18 million for prestripping.

For full-year 2020, the low-cost Fekola Mine is expected to produce between 590,000 and 620,000 ounces of gold at cash operating costs of between $285 and $325 per ounce and all-in sustaining costs of between $555 and $595 per ounce.

Fekola Mine Expansion

The Fekola Mine expansion project has progressed well through the second quarter of 2020 and is scheduled to be completed by the end of the third quarter of 2020. Mining fleet expansion equipment (including excavators, trucks, and drill rigs) continued to arrive on site and be commissioned throughout the second quarter. The mill expansion continues on schedule and was approximately 75% complete by the end of June 2020, including assembly of major components including cyclone clusters, leach and CIP tanks and completion of a double lift on the tailings storage facility. The mill expansion commissioning team arrived on site in late July and the mill expansion is expected to be fully commissioned by the end of the third quarter 2020.

In the second quarter of 2020, the Company amended its mining convention with the government of Mali to include the expansion and the solar plant. There have been no changes to the tax regime applicable to the Fekola Mine as a result of the amendment.

Fekola Solar Plant

The Fekola solar plant engineering and construction progressed well through the first quarter of 2020. In April 2020, due to issues related to COVID-19, the Company made the decision to temporarily suspend construction activities on the solar plant. Suspending the solar plant installation is not expected to impact Fekola’s production guidance for 2020 and has increased availability at the Fekola camp to assist mining operations in isolating more of the critical workforce on site and mitigate COVID-19 related travel and quarantine restrictions. The Company expects the solar plant construction will be completed within six months of the restart and is anticipating that the solar plant construction group will be mobilized at the end of September 2020.

Masbate Mine – Philippines

Three months ended Six months ended
June 30, June 30,
2020 2019 2020 2019
Gold revenue ($ in thousands) 75,580 81,469 149,994 147,296
Gold sold (ounces) 43,500 62,100 90,400 112,500
Average realized gold price ($/ ounce) 1,737 1,312 1,659 1,309
Tonnes of ore milled 1,989,061 2,093,834 3,860,121 3,926,928
Grade (grams/ tonne) 0.94 1.22 0.92 1.27
Recovery (%) 81.0 70.2 82.0 72.0
Gold production (ounces) 48,654 57,572 93,526 115,053
Cash operating costs^(1)^ ($/ gold ounce sold) 740 566 699 557
Cash operating costs^(1)^ ($/ gold ounce produced) 610 570 664 538
Total cash costs^(1)^ ($/ gold ounce sold) 858 627 798 628
All-in sustaining costs^(1)^ ($/ gold ounce sold) 1,060 749 981 746
Capital expenditures ($ in thousands) 4,529 7,520 9,290 15,964
Exploration ($ in thousands) 2,011 1,103 3,628 2,065

^(1) Non-IFRS measure. For a description of how these measures are calculated and a reconciliation of these measures to the most directly comparable measures specified, defined or determined under IFRS and presented in the Company’s financial statements, refer to “Non-IFRS Measures”.^

The Masbate Mine in the Philippines continued to perform well through the second quarter of 2020, despite being limited by a reduced workforce due to COVID-19 restrictions, producing 48,654 ounces of gold, in-line with budget. Compared to the second quarter of 2019, gold production was lower by 15% (8,918 ounces), as planned, mainly due to lower than budgeted grade. During the second quarter of 2020, processing was generally on budget. Mill feed grade was 0.94 g/t (compared to budget of 0.99 g/t and 1.22 g/t in the second quarter of 2019), throughput was 1.99 million tonnes (compared to budget of 2.0 million tonnes and 2.1 million tonnes in the second quarter of 2019) and average gold recoveries were 81.0% (compared to budget of 77.4% and 70.2% in the second quarter of 2019). Mill feed grade was lower than budget primarily due to the impact of previous near surface artisanal mining activity at the newly developed Montana Pit. This variance is not expected to continue as mining moves into the deeper, harder ore areas at Montana. Average gold recoveries were higher than budget due to mining more oxide ore than budgeted. For the first half of 2020, the Masbate Mine produced 93,526 ounces of gold, slightly above budget (343 ounces) and 19% (21,527 ounces) lower than the first half of 2019. The on-budget production was achieved despite COVID-19-related constraints, including a five-day mining shutdown in the first quarter and working with a reduced workforce through to May 2020. For the first half of 2020, mill throughput was 3.9 million tonnes, 5% lower than budget due to harder than expected ore and reduced workforce levels caused by COVID-19 and was in-line with the first half of 2019. The average grade processed for the first half of 2020 was 0.92 g/t (compared to budget of 0.92 g/t) together with average gold recoveries of 82.0% (compared to budget of 77.1%).

The Masbate Mine’s cash operating costs (refer to “Non-IFRS Measures”) were $610 per gold ounce produced ($740 per gold ounce sold) for the second quarter of 2020, below budget by $91 per ounce produced (13%) and $40 per ounce produced (7%) higher than the second quarter of 2019. Cash operating costs per gold ounce produced for the second quarter of 2020 were below budget resulting from lower than budgeted mining and processing costs. Mined tonnage was lower than budgeted, waste stripping activity was less than budgeted and average fuel prices for the mining fleet were 47% lower than budgeted due to lower unit fuel costs and shorter haulage distances. Processing costs in the second quarter of 2020 were lower than budget due to lower than budgeted HFO prices. Compared to the second quarter of 2019, cash operating costs per gold ounce produced in the second quarter of 2020 were higher as expected largely due to the lower ounces produced, as described above. For the first half of 2020, Masbate’s cash operating costs per ounce produced were also below budget, $664 per ounce produced ($699 per gold ounce sold) compared to a budget of $740 per ounce produced and higher than first half of 2019 of $538 per ounce produced. The cash operating costs per gold ounce produced in the first half of 2020 versus budget and the first half of 2019 arose for the same reasons as the second quarter variances discussed above.

All-in sustaining costs (refer to “Non-IFRS Measures”) for the second quarter of 2020 were $1,060 per gold ounce sold compared to a budget of $1,041 per gold ounce sold and $749 per gold ounce sold in the second quarter of 2019. All-in sustaining costs for the second quarter of 2020 were in-line with budget. For the first half of 2020, all-in sustaining costs were $981 per ounce compared to a budget of $1,125 per gold ounce sold and $746 per gold ounce sold in the first half of 2019. All-in sustaining costs for the first half of 2020 were lower than budget as a result of the lower than budgeted cash operating costs as discussed above, and lower than budgeted sustaining capital expenditures ($12 million), including $4 million to rebuild and replace mobile equipment and $5 million in prestripping which has been delayed due to the COVID-19 pandemic slightly offset by lower than budgeted gold ounces sold. These lower capital expenditures are due to timing differences only and are expected to be incurred later in 2020.

Capital expenditures for the second quarter of 2020 totalled $5 million, including $2 million for mobile equipment purchases and rebuilds, $1 million for processing replacements and $1 million for tailings storage facility projects. Capital expenditures in the first half of 2020 totalled $9 million, including processing equipment replacement costs of $2 million, mobile equipment acquisition costs and rebuilds of $3 million, prestripping costs of $1 million and $2 million for tailings storage facility projects.

For full-year 2020, the Masbate Mine is expected to produce between 200,000 and 210,000 ounces of gold, from the Main Vein and Montana Pits, at cash operating costs of between $665 and $705 per ounce and all-in sustaining costs of between $965 and $1,005 per ounce. Masbate’s gold production is scheduled to be weighted towards the second half of 2020 (54%), as higher grade ore from the new Montana Pit is forecast to be processed during the second half of the year.

Otjikoto Mine - Namibia

Three months ended Six months ended
June 30, June 30,
2020 2019 2020 2019
Gold revenue ($ in thousands) 80,579 46,462 146,837 95,066
Gold sold (ounces) 46,800 35,400 88,700 72,600
Average realized gold price ($/ ounce) 1,722 1,312 1,655 1,309
Tonnes of ore milled 866,955 867,284 1,724,398 1,668,459
Grade (grams/ tonne) 1.58 1.36 1.56 1.33
Recovery (%) 98.6 98.5 98.5 98.5
Gold production (ounces) 43,496 37,421 85,245 70,133
Cash operating costs^(1)^ ($/ gold ounce sold) 418 582 417 549
Cash operating costs^(1)^ ($/ gold ounce produced) 421 554 431 576
Total cash costs^(1)^ ($/ gold ounce sold) 487 634 484 602
All-in sustaining costs^(1)^ ($/ gold ounce sold) 757 1,174 801 997
Capital expenditures ($ in thousands) 10,920 17,221 22,652 24,503
Exploration ($ in thousands) 651 533 1,023 864

^(1) Non-IFRS measure. For a description of how these measures are calculated and a reconciliation of these measures to the most directly comparable measures specified, defined or determined under IFRS and presented in the Company’s financial statements, refer to “Non-IFRS Measures”.^

The Otjikoto Mine in Namibia, in which the Company holds a 90% interest, had a solid second quarter of 2020, producing 43,496 ounces of gold, 3% (1,342 ounces) above budget, as processed tonnes and recoveries were slightly better than budget. Compared to the second quarter of 2019, gold production was significantly higher by 16% (6,075 ounces) due to higher grade ore from the Wolfshag Pit (ore production from the pit resumed in the second half of 2019 following prestripping). During the second quarter of 2020, the Otjikoto Mine processed 0.87 million tonnes (compared to budget of 0.85 million tonnes and 0.87 million tonnes in the second quarter of 2019) at an average grade of 1.58 g/t (compared to budget of 1.58 g/t and 1.36 g/t in the second quarter of 2019) and average gold recoveries of 98.6% (compared to budget of 98.0% and 98.5% in the second quarter of 2019). For the first half of 2020, the Otjikoto Mine produced 85,245 ounces of gold, above budget by 3% (2,705 ounces) and 22% (15,112 ounces) higher than the first half of 2019. During the first half of 2020, the Otjikoto Mine processed 1.7 million tonnes (compared to budget of 1.7 million tonnes and 1.7 million tonnes in the first half of 2019) at an average grade of 1.56 g/t (compared to budget of 1.55 g/t and 1.33 g/t in the first half of 2019) with average gold recoveries of 98.5% (compared to budget of 98.0% and 98.5% in the first half of 2019).

In December 2019, the Board approved the development of the Wolfshag underground mine (the initial underground Mineral Reserve estimate for the down-plunge extension of the Wolfshag orebody included 210,000 ounces of gold in 1.2 million tonnes of ore at 5.57 g/t gold). During the first half of 2020, engineering of the underground mine continued and in the second quarter of 2020 an underground mining contractor was appointed for the development of the underground workings up to the production stopes. Development of the portal and primary ramp is expected to commence in the fourth quarter of 2020 and stope ore production is expected to commence in early 2022, in-line with original estimates. However, due to COVID-19 related delays, approximately $4 million of the related capital costs are now expected to be incurred in 2021 rather than in the current year.

For the second quarter of 2020, the Otjikoto Mine's cash operating costs (refer to “Non-IFRS Measures”) were $421 per gold ounce produced ($418 per ounce gold sold), $64 lower than budget (13%) and $133 per ounce (24%) lower compared with the second quarter of 2019. Compared to budget and the second quarter of 2019, budgeted cash operating costs per ounce gold produced for the second quarter of 2020 were lower resulting from higher than budgeted ounces produced, lower fuel costs and a weaker than budgeted Namibian dollar. For the first half of 2020, the Otjikoto Mine's cash operating costs were $431 per gold ounce produced ($417 per ounce gold sold), $64 lower than budget (13%) and $145 per ounce (25%) lower compared with the first half of 2019. The Otjikoto Mine's cash operating costs per gold ounce produced in the first half of 2020 continued to be below budget and the first half of 2019 for the same reasons as the positive second quarter variances discussed above.

All-in sustaining costs (refer to “Non-IFRS Measures”) for the second quarter of 2020 were $757 per gold ounce sold compared to a budget of $1,024 per gold ounce sold and $1,174 per gold ounce sold in the second quarter of 2019. For the first half of 2020, the Otjikoto Mine's all-in sustaining costs were $801 per gold ounce sold compared to a budget of $985 per gold ounce sold and $997 per gold ounce sold in the first half of 2019. All-in sustaining costs for the second quarter of 2020 and the first half of 2020 were lower than budget as a result of the lower than budgeted cash operating costs as discussed above, higher than budgeted gold ounces sold and lower than budgeted sustaining capital expenditures, including lower than budgeted prestripping. Sustaining capital expenditures for the second quarter and first half of 2020 were below budget by $8 million and $9 million, respectively. The Company expects a permanent capital expenditures savings of $4 million relating to prestripping. All other capital expenditures are expected to be incurred later in 2020.

Capital expenditures in the second quarter of 2020 totalled $11 million, primarily consisting of $8 million for prestripping in the Otjikoto Phase 3 and Wolfshag Phase 3 pits and $2 million for mobile equipment rebuilds and replacements. Capital expenditures in the first half of 2020 totalled $23 million, primarily consisting of $18 million for prestripping in the Otjikoto Phase 3 and Wolfshag Phase 3 pits and $3 million for mobile equipment rebuilds and replacements. The Company expects $8 million of costs for the development of Wolfshag Underground Mine and the connection to the national power grid (both non-sustaining) to be delayed to 2021 in addition to the $4 million capital expenditure savings discussed above.

The Namibian government had previously communicated that it continues to support safe mining but had directed mines to reduce staffing to minimal levels. The Company had accordingly implemented temporary measures at the Otjikoto Mine to reduce employees active on site to the minimum levels required to continue with mining and milling operations. On April 30, 2020, the government of Namibia announced the end of the Phase 1 lockdown and a partial easing of restrictions which allowed Otjikoto to resume full mining operations. A return to full mining production was completed within the first week of May 2020. The temporary cessation of waste mining during the period of reduced employee levels is not forecast to impact Otjikoto’s 2020 annual production guidance.

For full-year 2020, the Otjikoto Mine is forecast to produce between 165,000 and 175,000 ounces of gold, from the Otjikoto and Wolfshag Pits, at cash operating costs of between $480 and $520 per ounce and all-in sustaining costs of between $1,010 and $1,050 per ounce.

Investment in Calibre

On October 15, 2019, B2Gold completed the sale of the Nicaraguan Assets to Calibre. Prior to closing, B2Gold accounted for the Nicaraguan Assets as discontinued operations for financial reporting purposes in accordance with IFRS 5, Non-current assets held for sale and discontinued operations. The results of the Nicaraguan Assets have been presented as discontinued operations for the second quarter and first half of 2019 in the Condensed Interim Consolidated Statement of Operations and the Condensed Interim Consolidated Statements of Cash Flows. Following completion of the Calibre Transaction and conversion of the convertible debenture, B2Gold currently holds approximately 34% of the total issued and outstanding Calibre common shares. Commencing October 15, 2019, the Company no longer consolidates the results of its Nicaraguan operations in its consolidated financial statements, but rather equity accounts for its 34% ownership interest in Calibre. For the second quarter of 2020, the Company's estimate of its share of Calibre's net loss based on publicly available information was approximately $4 million. For the first half of 2020, the Company's estimate of its share of Calibre's net income based on publicly available information was approximately $3 million. Calibre will report its financial results on August 11, 2020. The Company will update any differences in the third quarter of 2020.

Attributable share of Calibre production and costs

Based on Calibre's production press release dated July 7, 2020, consolidated production of Calibre for the second quarter of 2020 was 6,010 ounces of which the Company's attributable share was 2,019 ounces. El Limon achieved gold production of 2,837 ounces for the second quarter of 2020, driven by an average mill grade of 3.85 g/t gold and recovery of 90.4% from 50,805 tonnes of ore milled. La Libertad achieved gold production of 3,173 ounces for the second quarter of 2020, from an average mill grade of 1.54 g/t gold and recovery of 91.9% from 146,277 tonnes of ore milled. Consolidated production of Calibre for the first half of 2020 was 48,095 ounces of which the Company's attributable share was 16,249 ounces.

The Company has assumed that the consolidated cash operating costs per ounce produced and all-in sustaining costs for Calibre for the first half of 2020 will be in-line with the revised guidance of approximately $830 per ounce and $1,090 per ounce respectively. Consolidated cash operating costs per ounce produced and all-in sustaining costs for Calibre for the second quarter of 2020 reflect the adjustment for actual first quarter of 2020 results.

On June 24, 2020, after a 10-week suspension of operations, Calibre announced that it now expects 2020 gold production of between 110,000 and 125,000 ounces at total cash costs of between $880 and $920 per ounce and all-in sustaining costs of between $1,070 and $1,100 an ounce, respectively.

2019 Discontinued Operations - El Limon and La Libertad Mines – Nicaragua

El Limon Mine produced 11,458 ounces of gold in the second quarter of 2019 at cash operating costs (refer to “Non-IFRS Measures”) of $953 per gold ounce produced ($973 per gold ounce sold). Production for the first half of 2019 for El Limon was 23,689 ounces of gold at cash operating costs of $916 per gold ounce produced ($983 per gold ounce sold). All-in sustaining costs (refer to "Non-IFRS Measures") for the second quarter of 2019 were $1,617 per gold ounce sold and $1,567 per gold ounce sold for the first half of 2019. Capital expenditures in the second quarter of 2019 totalled $11 million which consisted mainly of Limon Central prestripping of $6 million and underground development costs for Santa Pancha and Veta Nueva of $4 million. Capital expenditures for the first half of 2019 totalled $18 million which consisted mainly of Limon Central prestripping of $9 million and underground development costs for Santa Pancha and Veta Nueva of $7 million.

La Libertad Mine produced 25,672 ounces of gold in the second quarter of 2019 at cash operating costs of $936 per gold ounce produced ($1,030 per gold ounce sold). Production for the first half of 2019 for La Libertad was 43,758 ounces of gold at cash operating costs of $1,110 per gold ounce produced ($1,144 per gold ounce sold). All-in sustaining costs for the second quarter of 2019 were $1,577 per gold ounce sold and $1,607 per ounce of gold sold for the first half of 2019. Total capital expenditures in the second quarter of 2019 were $11 million, mainly consisting of $8 million for tailings storage facility construction and $2 million for land purchase and resettlement related to the Jabali Antenna open-pit. For the first half of 2019, capital expenditures totalled $15 million, mainly consisting of $11 million for tailings storage facility construction and $3 million for land purchase and resettlement related to the Jabali Antenna open-pit.

Gramalote Project - Colombia

Following amendments to the Gramalote Project shareholders agreement in December 2019, B2Gold was appointed as manager of the project as of January 1, 2020. In the first half of 2020, the Company sole-funded $12.5 million of expenditures on the Gramalote Project, which resulted in the Company's interest being increased to 50% (AngloGold Ashanti Limited ("AngloGold") - 50%). The additional sole-funded amount of $1.4 million was completed in July 2020 resulting in the Company having met its total sole-funding obligation of $13.9 million under the amended shareholder agreement. Each of B2Gold and AngloGold will now fund its share of expenditures pro rata.

On January 21, 2020, the Company announced positive results from the Gramalote PEA. The Gramalote PEA was prepared by B2Gold and evaluates recovery of gold from an open-pit mining operation that will move up to 143,000 tonnes per day (“tpd”) (50.0 million tonnes per annum ("Mtpa")), with a 30,137 tpd (11.0 Mtpa) processing plant that includes crushing, grinding, flotation, with fine grinding of the flotation concentrate and agitated leaching of both the flotation concentrate and the flotation tails, followed by a carbon-in-pulp recovery process to produce doré bullion. The Gramalote PEA is based solely on production from Gramalote Ridge and does not include potential production from the nearby Trinidad deposit, which has a current Inferred Mineral Resource estimate, and the Monjas West zone. The Mineral Resource estimate for Gramalote Ridge that forms the basis for the Gramalote PEA includes Indicated Mineral Resources of 70,110,000 tonnes grading 0.92 g/t gold for a total of 2,070,000 ounces of gold and Inferred Mineral Resources of 79,030,000 tonnes grading 0.79 g/t gold for a total of 2,010,000 ounces of gold.

The Gramalote PEA is preliminary in nature and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is no certainty that the PEA based on these Mineral Resources will be realized. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

Based on the positive results from the Gramalote PEA, the Company believes that the Gramalote Project has the potential to become a large, low-cost open-pit gold mine, subject to completion of ongoing infill drilling, which commenced in November 2019, and the results of a final feasibility study expected in the first quarter of 2021. The Environmental Impact Study and Project Implementation Plans for the Gramalote Project have been fully approved by the National Authority of Environmental Licenses of Colombia. Due to the desired modifications to the processing plant and infrastructure locations, a Modified Environment Impact Study and a Modified Project Implementation plan were submitted and are currently in the final approval process. If the final economics of the feasibility study are positive and the joint venture makes the decision to develop Gramalote as an open-pit gold mine, B2Gold would utilize its proven internal mine construction team to build the mine and mill facilities and operate the mine on behalf of the joint venture. The Gramalote Project has several key infrastructure advantages, including: reliable water supply - high rainfall region and located next to the Nus River; adjacent to a national highway, which connects directly to Medellin and to a major river with port facilities, capable of bringing supplies by barge to within 70 km of the site; proximity to the national electricity grid with ample low-cost power and a stable record of hydroelectric power; and a skilled labour workforce within Colombia. In addition, B2Gold expects the Gramalote Project to benefit from several key operational advantages, including: excellent metallurgical characteristics of the ore, which results in high recovery rates at low processing costs; relatively low strip ratio in the mine; low power costs and ability to mine and process higher grade ore in the initial years of the mine life resulting in improved project economics.

On March 30, 2020, B2Gold announced a temporary shutdown at the Gramalote Project due to COVID-19. Project operations restarted on May 4, 2020 for Environmental Impact Assessment related field activities, with exploration drilling recommencing on May 11, 2020. The project became fully operational within a week, with appropriate preventive practices, monitoring, and COVID-19 testing and tracing protocols in place. During the shutdown, other aspects of the feasibility study such as mine engineering review, metallurgical investigations and process plant design development continued to advance. Ongoing

exploration work continues with a focus on infill drilling of the Inferred Mineral Resource which is expected to be completed in August 2020. As previously announced, the Company now expects to complete the feasibility study in the first quarter of 2021. The Colombian government in Antioquia continues to closely manage levels of business activities and public movement with a view to gradually reopening the economy while ensuring adequacy of medical facilities including public testing, contact tracing and intensive care units.

LIQUIDITY AND CAPITAL RESOURCES

B2Gold continues to maintain a strong financial position and liquidity. At June 30, 2020, the Company is in a net cash position of $157 million, with its cash and cash equivalents of $628 million (December 31, 2019 - $141 million) exceeding its total debt balances of $471 million. Working capital as at June 30, 2020 was $656 million compared to $242 million at December 31, 2019.

The Company has an RCF with a syndicate of international banks for an aggregate amount of $600 million. The RCF also allows

for an accordion feature whereby upon receipt of additional binding commitments, the facility may be increased to $800 million any time prior to the maturity date of May 9, 2023. As at June 30, 2020, the Company had drawn $425 million under the $600 million RCF. The RCF bears interest on a sliding scale of between LIBOR plus 2.125% to 2.75% based on the Company’s consolidated net leverage ratio. Commitment fees for the undrawn portion of the facility are also on a similar sliding scale basis of between 0.48% and 0.62%. The Company has provided security on the RCF in the form of a general security interest over the Company’s assets and pledges creating a charge over the shares of certain of the Company’s direct and indirect subsidiaries. In connection with the RCF, the Company must also maintain certain ratios for leverage and interest coverage. As at June 30, 2020, the Company was in compliance with these debt covenants.

On April 8, 2020, as a precautionary measure and given the current uncertainty resulting from the COVID-19 pandemic, the Company completed the drawdown of a further $250 million on its $600 million RCF, resulting in a total revised drawn balance of $425 million and available undrawn capacity of $175 million. The $250 million drawn in April 2020 was to provide additional liquidity flexibility and assurance until the ultimate timing and outcome of the COVID-19 pandemic could be reasonably determined.

Based on current assumptions, including the continued strong operating performance at each of the Company's mines and no significant unforeseen work stoppages having been incurred due to COVID-19, the Company now intends to repay the entire drawn balance of $425 million under its RCF by the end of the third quarter of 2020 and finish 2020 in a strong cash position.

During the three and six months ended June 30, 2020, the Company repaid $0 million and $25 million on its RCF respectively, leaving an RCF outstanding balance of $425 million as at June 30, 2020.

For the three and six months ended June 30, 2020, resource property expenditures totalled $80 million and $193 million, respectively. The most significant expenditures were on the Fekola Mine with expenditures of $52 million and $126 million, respectively, the Masbate Mine had capital expenditures of $5 million and $9 million, respectively, the Otjikoto Mine had capital expenditures of $11 million and $23 million, respectively and the Company contributed $0 million and $13 million towards the Gramalote Project, respectively. Other exploration and development costs for the three and six months ended June 30, 2020 totalled $12 million and $21 million, respectively.

On April 28, 2020, the Company and its 10% partner GAMS entered into a definitive agreement with West African for the sale of the Toega project located in Burkina Faso. The initial non-refundable cash payment of $9 million due to B2Gold was received in the second quarter of 2020.

As at June 30, 2020, the Company had the following commitments (in addition to those disclosed elsewhere in the MD&A):

•For payments at the Fekola Mine of $10 million related to mobile equipment rebuilds, $6 million for mobile equipment for the mine expansion, $3 million related to the solar plant, $3 million for the plant expansion and $3 million related to other smaller projects, all of which are expected to be incurred in 2020.

•For payments of $4 million for the Company's share of development costs at the Gramalote Project, all of which is expected to be incurred in 2020.

•For payments of $1 million for development of the Wolfshag underground at the Otjikoto Mine, all of which is expected to be incurred in 2020.

•For payments of $2 million for the purchase of mobile equipment, $1 million for mobile rebuilds, $1 million for process plant repairs and $1 million for upgrades to the tailings storage facility at the Masbate Mine, all of which is expected to be incurred in 2020.

Derivative financial instruments

Forward contracts - fuel oil, gas oil, diesel

The Company uses forward contracts for fuel oil, gas oil and diesel to manage the risk of volatility in the Company's future operating costs. The Company reviews the open positions and the potential for additional forward contracts on an ongoing basis. During the first half of 2020, the Company entered into additional forward contracts for the purchase of 60,885,000 litres of fuel oil and forward contracts for the purchase of 42,163,000 litres of gas oil with settlements scheduled between May 2020 and May 2022. These derivative instruments were not designated as hedges by the Company and are being recorded at fair value through profit and loss ("FVTPL").

The following is a summary, by maturity dates, of the Company’s fuel derivative contracts outstanding as at June 30, 2020:

2020 2021 2022 Total
Forward – fuel oil:
Litres (thousands) 20,525 31,823 10,880 63,228
Average strike price $ 0.26 $ 0.24 $ 0.26 $ 0.25
Forward – gas oil:
Litres (thousands) 17,760 25,014 9,271 52,045
Average strike price $ 0.41 $ 0.33 $ 0.33 $ 0.36
Forward – diesel:
Litres (thousand) 757 — — 757
Average strike price $ 0.57 $ — $ — $ 0.57
Collars - fuel oil:
Litres (thousand) 10,399 11,055 — 21,454
Average ceiling price $ 0.26 $ 0.26 $ — $ 0.26
Average floor price $ 0.39 $ 0.39 $ — $ 0.39
Collars - gas oil:
Litres (thousand) 2,862 6,439 — 9,301
Average ceiling price $ 0.40 $ 0.40 $ — $ 0.40
Average floor price $ 0.57 $ 0.57 $ — $ 0.57

The unrealized fair value of these contracts at June 30, 2020 was $(4) million.

Interest rate swaps

On January 24, 2019, the Company entered into a series of interest swaps with a notional amount of $125 million with settlements scheduled between April 2019 and July 2021. Under these contracts, the Company receives a floating rate equal to the three month United States dollar LIBOR rate and pays a fixed rate of between 2.36% and 2.67%. These derivative instruments were not designated as hedges by the Company and are being recorded at FVTPL. The unrealized fair value of these contracts at June 30, 2020 was $(3) million.

Operating activities

Cash flow provided by operating activities was a quarterly record of $238 million in the second quarter of 2020 compared to $93 million in the second quarter of 2019, an increase of $145 million due mainly to higher revenues of $175 million. Based on current assumptions, including a gold price of $1,700 per ounce for the remainder of 2020, the Company now expects to make total cash income tax payments in 2020 of approximately $178 million, an increase of $33 million from the previous first quarter of 2020 estimate, based on changes in realized gold price assumptions and expected payment timing. Cash flow provided by operating activities was $454 million in the first half of 2020 compared to $179 million in the first half of 2019, an increase of $275 million due mainly to higher revenues of $291 million.

Financing activities

The Company’s cash from financing activities for the second quarter of 2020 was a net inflow of $251 million. During the second quarter of 2020, the Company drew down $250 million under its RCF, received proceeds from the exercise of stock options of $11 million, made equipment loan facility repayments of $5 million and interest and commitment fee payments of $4 million.

The Company’s cash from financing activities for the first half of 2020 was a net inflow of $219 million. During the first half of 2020, the Company drew down $250 million under its RCF, received proceeds from the exercise of stock options of $27 million, made repayments of $25 million on the RCF, made equipment loan facility repayments of $16 million, made interest and commitment fee payments of $8 million and paid dividends of $10 million.

On February 27, 2020, the Board declared a quarterly cash dividend of $0.01 per common share, which was paid on March 23, 2020 to shareholders of record as of March 9, 2020 in the amount of $10 million. This dividend is designated as an "eligible dividend" for the purposes of the Income Tax Act (Canada). Dividends paid by B2Gold to shareholders outside Canada (non-resident investors) will be subject to Canadian non-resident withholding taxes.

On June 11, 2020, the Board declared a quarterly cash dividend of $0.02 per common share, an increase of 100%, paid on July 7, 2020 to shareholders of record as of June 23, 2020. The declaration and payment of future quarterly dividends remains at the discretion of the Board and will depend on the Company's financial results, cash requirements, future prospects and other factors deemed relevant by the Board. In light of the current higher gold price environment, the Company's strong operational performance and the fact that the Company has now reached a net positive cash position, the Board has decided to increase the quarterly dividend to $0.04 per share (or an expected $0.16 per share on an annual basis), which will become effective upon approval and declaration of the third quarter dividend. This represents a further 100% increase from the second quarter of 2020 dividend and four times higher than the initial quarterly dividend of $0.01 per share declared in the fourth quarter of 2019. The declaration and payment of future quarterly dividends remains at the discretion of the Board and will depend on the Company's financial results, cash requirements, future prospects and other factors deemed relevant by the Board.

The declaration and payment of future dividends and the amount of any such dividends will be subject to the determination of the Board of Directors, in its sole and absolute discretion, taking into account, among other things, economic conditions, business performance, financial condition, growth plans, expected capital requirements, compliance with the Company's constating documents, all applicable laws, including the rules and policies of any applicable stock exchange, as well as any contractual restrictions on such dividends, including any agreements entered into with lenders to the Company, and any other factors that the Board of Directors deems appropriate at the relevant time. There can be no assurance that any dividends will be paid at the intended rate or at all in the future.

Investing activities

For the three and six months ended June 30, 2020, resource property expenditures totalled $80 million and $193 million, respectively. The most significant expenditures were on the Fekola Mine with expenditures of $52 million and $126 million, respectively, the Masbate Mine had capital expenditures of $5 million and $9 million, respectively, the Otjikoto Mine had capital expenditures of $11 million and $23 million, respectively and the Company contributed $0 million and $13 million towards the Gramalote Project, respectively (refer to “Review of Mining Operations and Development Projects" section for additional details of capital expenditures). Other development and exploration expenditures for the three and six months ended June 30, 2020 were $12 million and $21 million, respectively. Although there may be differences between the budgeted and actual timing of the Company's capital expenditures for 2020, the Company does not currently expect any material changes to its overall budgeted capital expenditures for the year.

In the second quarter of 2020, the initial non-refundable cash payment of $9 million due to B2Gold in relation to the sale of Toega was received.

Exploration

Resource property expenditures on exploration are disclosed in the table below.

For the three months ended <br>June 30, 2020 For the three months ended <br>June 30, 2019 For the six months ended <br>June 30, 2020 For the six<br>months ended<br>June 30, 2019
$ $ $ $
(000’s) (000’s) (000’s) (000’s)
Fekola Mine, exploration 4,171 6,215 5,041 8,310
Masbate Mine, exploration 2,011 1,103 3,628 2,065
Otjikoto Mine, exploration 651 533 1,023 864
Anaconda Regional, exploration 2,472 710 5,326 948
Toega Project, exploration (563) 682 117 1,153
Kiaka Project, exploration 860 1,442 1,355 1,922
Ondundu Project, exploration 160 530 343 737
Finland Properties, exploration 424 58 798 278
Other 1,697 1,290 3,616 2,907
11,883 12,563 21,247 19,184

The total exploration budget for 2020 is approximately $51 million, excluding drilling included in the Gramalote Project budget. Exploration at existing properties will once again focus predominantly in West Africa, as well as the other operating mine sites in Namibia and the Philippines, with a total budget of $33 million. The Company has also allocated an additional $18 million for its grassroots exploration programs for 2020.

Fekola Mine

In 2020, approximately $18 million is budgeted to be spent on exploration in Mali. The Company plans to focus on expanding the main Fekola deposit to the north and test several near mine potential open pit targets such as Fekola South, Cardinal, FNZ and Kingfisher structures with an allocation of approximately 20,000 metres of drilling. On January 16, 2020, the Company announced an updated Fekola Mineral Resource estimate based on cumulative 240,000 metres of exploration drilling in 1,124 drill holes (including 120,000 metres in 501 holes drilled by B2Gold since June 2014). The updated Fekola Indicated Mineral Resource estimate as at December 31, 2019 was 110,600,000 tonnes at 1.70 g/t gold for a total of 6,052,000 ounces of gold constrained within a $1,500 per ounce gold pit shell above a cut-off grade of 0.5 g/t gold. When compared to the December 31, 2018 Fekola Indicated Mineral Resource estimate, the updated Indicated Mineral Resource estimate has increased by 1,290,000 ounces of gold (15.4%) (after adjusting for the 455,810 ounces of gold produced in 2019). The updated Fekola Indicated Mineral Resource estimate as at December 31, 2019 provided the basis for an updated design pit and new Fekola Probable Mineral Reserve estimate, which was published on March 20, 2020 as part of the Fekola Technical Report. The current Fekola Mineral Reserve design pit is located well within the updated Fekola Mineral Resource pit.

Drilling is ongoing at Cardinal, including both infill and exploration. The Cardinal zone is less than one kilometre west of the Fekola Mine open pit.

Anaconda Regional

In 2020, the Company has budgeted approximately 41,000 metres of diamond drilling and reverse circulation drilling on several zones in the Anaconda Area, located approximately 20 kilometres from Fekola. Exploration will focus on increasing the known saprolite resources at the Adder and Mamba zones and further testing the underlying sulphide mineralization at the Mamba zone. At Adder, drilling has extended the strike extent of mineralization up to 1 kilometre north of the known resource area. At Mamba, recent drilling has extended the high-grade mineralized saprolite zone by approximately 600 metres, resulting in more than 1 kilometre of known strike length, and has led to the discovery of a continuous bedrock sulphide zone down plunge of the Mamba zone's saprolite mineralization. This Fekola-style, south-plunging body of sulphide mineralization remains open down plunge and will be the subject of extensive drilling in late 2020 and into 2021.

Masbate Mine

The Masbate exploration budget for 2020 is $8 million, including approximately 25,000 metres of diamond and reverse circulation drilling. The 2020 exploration program will focus on drill testing the most prospective Inferred Mineral Resources below existing design pits to determine if existing open pits can be expanded. Several grassroot greenfield targets that have seen variable exploration and drilling will be further tested with mapping, trenching and drilling as well.

Otjikoto Mine and Regional Exploration

The total exploration budget for Namibia in 2020 is $4 million. Exploration in 2020 will include 19,500 metres of diamond drilling and 3,300 metres of RAB drilling split between the Otjikoto Mine and the Ondundu joint venture, located approximately 200 kilometres southwest of Otjikoto. The majority of the diamond drilling will be allocated towards testing the Wolfshag zone and near Wolfshag open pit and underground targets.

Other Greenfield Exploration

Given B2Gold’s exploration teams successful discovery history, the Company has budgeted $18 million for greenfield exploration opportunities internationally in 2020, as it continues to pursue early stage exploration discoveries through property acquisitions and joint ventures with junior exploration companies.

CRITICAL ACCOUNTING ESTIMATES

Full disclosure of the Company’s accounting policies and significant accounting judgments and estimation uncertainties in accordance with IFRS can be found in Notes 4 and 5 of its audited consolidated financial statements for the year ended December 31, 2019. Management considers the following estimates to be the most critical in understanding the judgments involved in preparing the Company’s interim consolidated financial statements and the uncertainties that could impact its results of operations, financial condition and cash flows:

COVID-19 estimation uncertainty

A global pandemic related to COVID-19 was declared in March 2020 by the World Health Organization. The current and expected impacts on global commerce have been and are anticipated to continue to be far-reaching. To date, globally, there has been significant volatility in commodity prices and foreign exchange rates, restrictions on the conduct of business in many jurisdictions, including travel restrictions, and supply chain disruptions. There is significant ongoing global uncertainty surrounding COVID-19 and the extent and duration of the impact that it may have.

The areas of judgement and estimation uncertainty for the Company which may be impacted include estimates used to determine recoverable reserves and resources, estimates used to determine the recoverable amounts of long-lived assets, estimates used to determine the recoverable amounts of value-added tax receivables and estimates regarding deferred income taxes and valuation allowances. Changes related to these could be material.

Mineral reserve and resource estimates

Mineral reserves are estimates of the amount of ore that can be economically and legally extracted from the Company’s mining properties. The Company estimates its mineral reserves and mineral resources based on information compiled by appropriately qualified persons relating to the geological data on the size, depth and shape of the ore body, and requires complex geological judgments to interpret the data. The estimation of recoverable reserves is based upon factors such as estimates of foreign exchange rates, commodity prices, future capital requirements, metallurgical recoveries, permitting and production costs along with geological assumptions and judgments made in estimating the size, and grade of the ore body. Changes in the reserve or resource estimates may impact the carrying value of mining interests, mine restoration provisions, recognition of deferred tax assets, depreciation and amortization charges and royalties receivable.

Impairment of long-lived assets

Long-lived assets are tested for impairment, or reversal of a previous impairment, if there is an indicator of impairment or a subsequent reversal. Calculating the estimated recoverable amount of cash generating units for long-lived asset requires management to make estimates and assumptions with respect to future production levels, mill recoveries, operating and capital costs, future metal prices, foreign exchange rates, taxation rates, and discount rates in its life-of-mine plans and preparation of updated feasibility level technical studies when relevant. Changes in any of the assumptions or estimates used in determining the recoverable amount could impact the analysis. Such changes could be material.

Value-added tax receivables

The Company incurs indirect taxes, including value-added tax, on purchases of goods and services at its operating mines and development projects. Indirect tax balances are recorded at their estimated recoverable amounts within current or long-term assets, net of provisions, and reflect the Company’s best estimate of their recoverability under existing tax rules in the respective jurisdictions in which they arise. Management’s assessment of recoverability considers the probable outcomes of claimed deductions and/or disputes. The provisions and balance sheet classifications made to date may be subject to change and such change may be material.

Current and deferred income taxes

The Company is periodically required to estimate the tax basis of assets and liabilities. Where applicable tax laws and regulations are either unclear or subject to varying interpretations, it is possible that changes in these estimates could occur that materially affect the amounts of deferred income tax assets and liabilities recorded in the financial statements. Changes in deferred tax assets and liabilities generally have a direct impact on earnings in the period that the changes occur.

Each period, the Company evaluates the likelihood of whether some portion or all of each deferred tax asset will not be realized. This evaluation is based on historic and future expected levels of taxable income, the pattern and timing of reversals of taxable temporary timing differences that give rise to deferred tax liabilities, and tax planning initiatives. Levels of future taxable income are affected by, among other things, market gold prices, production costs, quantities of proven and probable gold reserves, interest rates and foreign currency exchange rates.

Uncertain tax positions

The Company’s operations involve the application of complex tax regulations in multiple international jurisdictions. Determining the tax treatment of a transaction requires the Company to apply judgement in its interpretation of the applicable tax law. These positions are not final until accepted by the relevant tax authority. The tax treatment may change based on the result of assessments or audits by the tax authorities often years after the initial filing.

The Company recognizes and records potential liabilities for uncertain tax positions based on its assessment of the amount, or range of amounts of tax that will be due. The Company adjusts these accruals as new information becomes available. Due to the complexity and uncertainty associated with certain tax treatments, the ultimate resolution could result in a payment that is materially different from the Company’s current estimate of the tax liabilities.

The Gramalote joint venture received notice from the Colombian Tax Office (DIAN) that it disagreed with the Company’s tax treatment of certain items in the 2013 and 2014 income tax returns resulting in assessments with additional income taxes and penalty fines. These assessments are currently being appealed by the Gramalote Joint Venture and the outcome of these appeals cannot be determined at this time. The Company does not believe that its share of any taxes payable under the assessments are material and no provision for any amounts that may be payable have been recorded at this time, pending the outcome of the appeal process.

RISKS AND UNCERTAINTIES

The exploration and development of natural resources are highly speculative in nature and the Company’s business operations, investments and prospects are subject to significant risks. For details of these risks, please refer to the risk factors set forth in the Company’s Annual Information Form, which can be found under the Company’s corporate profile on SEDAR at www.sedar.com, the Company’s Form 40-F Annual Report, which can be found on EDGAR at www.sec.gov, and the Company’s other filings and submissions with securities regulators on SEDAR and EDGAR, which could materially affect the Company’s business, operations, investments and prospects and could cause actual events to differ materially from those described in forward-looking statements relating to the Company. Additional risks and uncertainties not presently known to the Company or that the Company currently considers immaterial may also impair the business, operations, investments and prospects of the Company. If any of the risks actually occur, the business of the Company may be harmed and its financial condition and results of operations may suffer significantly.

INTERNAL CONTROL OVER FINANCIAL REPORTING

The Company’s management, with the participation of the Company’s Chief Executive Officer and Chief Financial Officer, are responsible for establishing and maintaining adequate internal control over financial reporting. The Company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with IFRS. Any system of internal control over financial reporting, no matter how well designed, has inherent limitations. As a result, even those systems determined to be effective can only provide reasonable assurance regarding the preparation of financial statements.

In the first quarter of 2020, the Company moved its Vancouver office staff and several site administrative staff to work from home. This continued for the majority of the second quarter of 2020 with some staff returning to the office in late June 2020. This has resulted in certain processes and controls that were previously performed or documented manually to be completed and retained electronically. There were no significant changes to the processes and controls at the sites for the period. Despite the changes required by the current environment, the Company’s management has determined that there has been no significant changes in the Company’s internal control over financial reporting during the three months ended June 30, 2020, that has materially affected, or is reasonably likely to materially affect, the Company’s internal control over financial reporting.

NON-IFRS MEASURES

Cash operating costs per gold ounce sold and total cash costs per gold ounce sold

‘‘Cash operating costs per gold ounce’’ and “total cash costs per gold ounce” are common financial performance measures in the gold mining industry but, as non-IFRS measures, they do not have a standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. Management believes that, in addition to conventional measures prepared in accordance with IFRS, certain investors use this information to evaluate our performance and ability to generate cash flow. Accordingly, these measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measures, along with sales, are considered to be a key indicator of the Company’s ability to generate earnings and cash flow from its mining operations.

Cash cost figures are calculated on a sales basis in accordance with a standard developed by The Gold Institute, which was a worldwide association of suppliers of gold and gold products and included leading North American gold producers. The Gold Institute ceased operations in 2002, but the standard is the accepted standard of reporting cash cost of production in North America. Adoption of the standard is voluntary and the cost measures presented may not be comparable to other similarly titled measures of other companies. Other companies may calculate these measures differently. Cash operating costs and total cash costs per gold ounce sold are derived from amounts included in the statement of operations and include mine site operating costs such as mining, processing, smelting, refining, transportation costs, royalties and production taxes, less silver by-product credits. The tables below show a reconciliation of cash operating costs per gold ounce sold and total cash costs per gold ounce sold to production costs as extracted from the unaudited condensed interim consolidated financial statements on a consolidated and a mine-by-mine basis:

For the three months ended June 30, 2020
Fekola<br> Mine Masbate<br> Mine Otjikoto<br> Mine Total Calibre equity investment Grand<br> Total
$ $ $ $ $ $
Production costs 45,220 32,201 19,566 96,987 2,029 99,016
Royalties and production taxes 22,875 5,119 3,240 31,234 (1,463) 29,771
Total cash costs 68,095 37,320 22,806 128,221 566 128,787
Gold sold (ounces) 166,800 43,500 46,800 257,100 1,622 258,722
Cash operating costs per ounce ($/ gold ounce sold) 271 740 418 377 1,251 383
Total cash costs per ounce ($/ gold ounce sold) 408 858 487 499 349 498
For the three months ended June 30, 2019
--- --- --- --- --- --- --- --- ---
Fekola<br> Mine Masbate<br> Mine Otjikoto<br> Mine Total from Continuing Operations El Limon<br> Mine La Libertad<br> Mine Total from Disc. Operations Grand<br> Total
$ $ $ $ $ $ $
Production costs 39,596 35,130 20,587 95,313 9,531 23,477 33,008 128,321
Royalties and production taxes 11,901 3,795 1,856 17,552 783 691 1,474 19,026
Total cash costs 51,497 38,925 22,443 112,865 10,314 24,168 34,482 147,347
Gold sold (ounces) 106,200 62,100 35,400 203,700 9,791 22,791 32,582 236,282
Cash operating costs per ounce ($/ gold ounce sold) 373 566 582 468 973 1,030 1,013 543
Total cash costs per ounce ($/ gold ounce sold) 485 627 634 554 1,053 1,060 1,058 624

All values are in US Dollars.

For the six months ended June 30, 2020
Fekola<br> Mine Masbate<br> Mine Otjikoto<br> Mine Total Calibre equity investment Grand<br> Total
$ $ $ $ $ $
Production costs 88,321 63,211 37,011 188,543 13,114 201,657
Royalties and production taxes 42,093 8,971 5,901 56,965 1,002 57,967
Total cash costs 130,414 72,182 42,912 245,508 14,116 259,624
Gold sold (ounces) 317,500 90,400 88,700 496,600 15,852 512,452
Cash operating costs per ounce ($/ gold ounce sold) 278 699 417 380 827 394
Total cash costs per ounce ($/ gold ounce sold) 411 798 484 494 890 507
For the six months ended June 30, 2019
--- --- --- --- --- --- --- --- ---
Fekola<br> Mine Masbate<br> Mine Otjikoto<br> Mine Total from Continuing Operations El Limon<br> Mine La Libertad<br> Mine Total from Disc. Operations Grand<br> Total
$ $ $ $ $ $ $
Production costs 85,624 62,647 39,879 188,150 20,833 45,840 66,673 254,823
Royalties and production taxes 23,697 8,015 3,794 35,506 1,804 1,172 2,976 38,482
Total cash costs 109,321 70,662 43,673 223,656 22,637 47,012 69,649 293,305
Gold sold (ounces) 222,000 112,500 72,600 407,100 21,195 40,063 61,258 468,358
Cash operating costs per ounce ($/ gold ounce sold) 386 557 549 462 983 1,144 1,088 544
Total cash costs per ounce ($/ gold ounce sold) 492 628 602 549 1,068 1,173 1,137 626

All values are in US Dollars.

Cash operating costs per gold ounce produced

In addition to cash operating costs on a per gold ounce sold basis, the Company also presents cash operating costs on a per gold produced basis. Cash operating costs per gold ounce produced is derived from amounts included in the statement of operations and include mine site operating costs such as mining, processing, smelting, refining, transportation costs, less silver by-product credits. The tables below show a reconciliation of cash operating costs per gold ounce produced to production costs as extracted from the unaudited condensed interim consolidated financial statements on a consolidated and a mine-by-mine basis:

For the three months ended June 30, 2020
Fekola<br> Mine Masbate<br> Mine Otjikoto<br> Mine Total Calibre equity investment Grand<br> Total
$ $ $ $ $ $
Production costs 45,220 32,201 19,566 96,987 2,029 99,016
Inventory sales adjustment (938) (2,528) (1,235) (4,701) — (4,701)
Cash operating costs 44,282 29,673 18,331 92,286 2,029 94,315
Gold produced (ounces) 147,424 48,654 43,496 239,574 2,019 241,593
Cash operating costs per ounce ($/ gold ounce produced) 300 610 421 385 1,005 390
For the three months ended June 30, 2019
--- --- --- --- --- --- --- --- ---
Fekola<br> Mine Masbate<br> Mine Otjikoto<br> Mine Total from Continuing Operations El Limon<br> Mine La Libertad<br> Mine Total from Disc. Operations Grand<br> Total
$ $ $ $ $ $ $
Production costs 39,596 35,130 20,587 95,313 9,531 23,477 33,008 128,321
Inventory sales adjustment 2,172 (2,294) 130 8 1,390 547 1,937 1,945
Cash operating costs 41,768 32,836 20,717 95,321 10,921 24,024 34,945 130,266
Gold produced (ounces) 113,897 57,572 37,421 208,890 11,458 25,672 37,130 246,020
Cash operating costs per ounce ($/ gold ounce produced) 367 570 554 456 953 936 941 529

All values are in US Dollars.

For the six months ended June 30, 2020
Fekola<br> Mine Masbate<br> Mine Otjikoto<br> Mine Total Calibre equity investment Grand<br> Total
$ $ $ $ $ $
Production costs 88,321 63,211 37,011 188,543 13,114 201,657
Inventory sales adjustment (2,873) (1,144) (270) (4,287) — (4,287)
Cash operating costs 85,448 62,067 36,741 184,256 13,114 197,370
Gold produced (ounces) 311,435 93,526 85,245 490,206 16,249 506,455
Cash operating costs per ounce ($/ gold ounce produced) 274 664 431 376 807 390
For the six months ended June 30, 2019
--- --- --- --- --- --- --- --- ---
Fekola<br> Mine Masbate<br> Mine Otjikoto<br> Mine Total from Continuing Operations El Limon<br> Mine La Libertad<br> Mine Total from Disc. Operations Grand<br> Total
$ $ $ $ $ $ $
Production costs 85,624 62,647 39,879 188,150 20,833 45,840 66,673 254,823
Inventory sales adjustment (1,539) (747) 519 (1,767) 858 2,746 3,604 1,837
Cash operating costs 84,085 61,900 40,398 186,383 21,691 48,586 70,277 256,660
Gold produced (ounces) 224,246 115,053 70,133 409,432 23,689 43,758 67,447 476,879
Cash operating costs per ounce ($/ gold ounce produced) 375 538 576 455 916 1,110 1,042 538

All values are in US Dollars.

All-in sustaining costs per gold ounce

In June 2013, the World Gold Council, a non-regulatory association of the world’s leading gold mining companies established to promote the use of gold to industry, consumers and investors, provided guidance for the calculation of the measure “all-in sustaining costs per gold ounce”, but as a non-IFRS measure, it does not have a standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. The World Gold Council standard became effective January 1, 2014. On November 16, 2018, the World Council announced an update to its Guidance Note on all-in sustaining costs with application effective starting January 1, 2019. This update provides additional transparency about the costs of gold production and support further consistency of application of the Guidance Note. The major updates to the Guidance Note include providing a more specific definition of non-sustaining costs as those costs incurred at ‘new operations’ and costs related to ‘major projects at existing operations’ where these projects will materially benefit the operation in the future. The Guidance Note has defined ‘material benefit’ as an increase of at least 10% in annual or life of mine production, net present value or reserves compared to the remaining life of the operation. In addition, the Guidance Note has been updated to clarify that production phase capitalized stripping only meets the definition of non-sustaining if the stripping is expected to take at least 12 months and the subsequent ore production phase is expected to be more than 5 years. The Company adopted the updates to the Guidance Note, effective January 1, 2019.

Management believes that the all-in sustaining costs per gold ounce measure provides additional insight into the costs of producing gold by capturing all of the expenditures required for the discovery, development and sustaining of gold production and allows the Company to assess its ability to support capital expenditures to sustain future production from the generation of operating cash flows. Management believes that, in addition to conventional measures prepared in accordance with IFRS, certain investors use this information to evaluate the Company's performance and ability to generate cash flow. Accordingly, it is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Adoption of the standard is voluntary and the cost measures presented may not be comparable to other similarly titled measures of other companies. The Company has applied the principles of the World Gold Council recommendations and has reported all-in sustaining costs on a sales basis. Other companies may calculate these measures differently.

B2Gold defines all-in sustaining costs per ounce as the sum of cash operating costs, royalties and production taxes, capital expenditures and exploration costs that are sustaining in nature, sustaining lease expenditures, corporate general and administrative costs, share-based payment expenses related to RSUs/DSUs/PSUs, community relations expenditures, reclamation liability accretion and realized (gains) losses on fuel derivative contracts, all divided by the total gold ounces sold to arrive at a per ounce figure.

The tables below show a reconciliation of all-in sustaining costs per ounce to production costs as extracted from the unaudited condensed interim consolidated financial statements on a consolidated and a mine-by-mine basis for the three months ended June 30, 2020:

For the three months ended June 30, 2020
Fekola<br> Mine Masbate<br> Mine Otjikoto<br> Mine Corporate Total Calibre equity investment ^(4)^ Grand<br> Total
$ $ $ $ $ $ $
Production costs 45,220 32,201 19,566 — 96,987 2,029 99,016
Royalties and production taxes 22,875 5,119 3,240 — 31,234 (1,463) 29,771
Corporate administration 1,004 566 969 5,523 8,062 249 8,311
Share-based payments – RSUs/DSUs/PSUs^(1)^ — — — 2,481 2,481 — 2,481
Community relations 452 72 (32) — 492 — 492
Reclamation liability accretion^(2)^ 71 71 47 — 189 — 189
Realized losses on derivative contracts 1,232 1,324 669 — 3,225 — 3,225
Sustaining lease expenditures 194 360 92 170 816 — 816
Sustaining capital expenditures^(3)^ 18,564 4,375 10,242 — 33,181 — 33,181
Sustaining mine exploration^(3)^ 4,171 2,011 627 — 6,809 — 6,809
Total all-in sustaining costs 93,783 46,099 35,420 8,174 183,476 815 184,291
Gold sold (ounces) 166,800 43,500 46,800 — 257,100 1,622 258,722
All-in sustaining cost per ounce ($/ gold ounce sold) 562 1,060 757 — 714 502 712

^(1) Included as a component of Share-based payments on the statement of operations.^

^(2) Excludes reclamation accretion relating to Kiaka.^

^(3) Refer to Sustaining capital expenditures and Sustaining mine exploration reconciliations below.^

^(4) Reflects the update of Calibre's first quarter 2020 results to actual and an estimate of Calibre's second quarter 2020 results.^

The table below shows a reconciliation of sustaining capital expenditures to operating mine capital expenditures as extracted from the unaudited condensed interim consolidated financial statements for the three months ended June 30, 2020:

For the three months ended June 30, 2020
Fekola<br> Mine Masbate<br> Mine Otjikoto<br> Mine Total Calibre equity investment Grand<br> Total
$ $ $ $ $ $
Operating mine capital expenditures 52,340 4,529 10,920 67,789 — 67,789
Mine expansion equipment (14,245) — — (14,245) — (14,245)
Plant expansion (12,751) — — (12,751) — (12,751)
Solar plant (6,535) — — (6,535) — (6,535)
Other (245) (5) (15) (265) — (265)
Land acquisitions — (149) — (149) — (149)
Underground development — — (663) (663) — (663)
Sustaining capital expenditures 18,564 4,375 10,242 33,181 — 33,181

The table below shows a reconciliation of sustaining mine exploration to operating mine exploration as extracted from the unaudited condensed interim consolidated financial statements for the three months ended June 30, 2020:

For the three months ended June 30, 2020
Fekola<br> Mine Masbate<br> Mine Otjikoto<br> Mine Total Calibre equity investment Grand<br> Total
$ $ $ $ $ $
Operating mine exploration 4,171 2,011 651 6,833 — 6,833
Regional exploration — — (24) (24) — (24)
Sustaining mine exploration 4,171 2,011 627 6,809 — 6,809

The tables below show a reconciliation of all-in sustaining costs per ounce to production costs as extracted from the unaudited condensed interim consolidated financial statements on a consolidated and a mine-by-mine basis for the three months ended June 30, 2019:

For the three months ended June 30, 2019
Fekola<br> Mine Masbate<br> Mine Otjikoto<br> Mine Corporate Total from Continuing Operations El Limon<br> Mine La Libertad<br> Mine Total from Disc. Operations Calibre equity investment Grand<br> Total
$ $ $ $ $ $ $ $ $ $
Production costs 39,596 35,130 20,587 — 95,313 9,531 23,477 33,008 — 128,321
Royalties and production taxes 11,901 3,795 1,856 — 17,552 783 691 1,474 — 19,026
Corporate administration 1,815 1,455 1,249 7,173 11,692 678 500 1,178 — 12,870
Share-based payments – RSUs/DSUs^(1)^ 21 — — 2,577 2,598 — — — — 2,598
Community relations (53) 165 352 — 464 356 214 570 — 1,034
Reclamation liability accretion^(2)^ 163 135 117 — 415 104 188 292 — 707
Realized gains on derivative contracts (614) (601) (382) — (1,597) — (29) (29) — (1,626)
Sustaining lease expenditures 194 268 107 175 744 — — — — 744
Sustaining capital expenditures^(3)^ 7,088 6,113 17,221 — 30,422 4,381 10,556 14,937 — 45,359
Sustaining mine exploration^(3)^ 6,215 26 445 — 6,686 — 348 348 — 7,034
Total all-in sustaining costs 66,326 46,486 41,552 9,925 164,289 15,833 35,945 51,778 — 216,067
Gold sold (ounces) 106,200 62,100 35,400 — 203,700 9,791 22,791 32,582 — 236,282
All-in sustaining cost per ounce ($/ gold ounce sold) 625 749 1,174 — 807 1,617 1,577 1,589 — 914

^(1) Included as a component of Share-based payments on the statement of operations.^

^(2) Excludes reclamation accretion relating to Kiaka and Toega.^

^(3) Refer to Sustaining capital expenditures and Sustaining mine exploration reconciliations below.^

The table below shows a reconciliation of sustaining capital expenditures to operating mine capital expenditures as extracted from the unaudited condensed interim consolidated financial statements for the three months ended June 30, 2019:

For the three months ended June 30, 2019
Fekola<br> Mine Masbate<br> Mine Otjikoto<br> Mine Total from Continuing Operations El Limon<br> Mine La Libertad<br> Mine Total from Discontinued Operations Calibre equity investment Grand<br> Total
$ $ $ $ $ $ $ $ $
Operating mine capital expenditures 12,829 7,520 17,221 37,570 10,938 10,556 21,494 — 59,064
Mobile equipment purchases (4) — — (4) — — — — (4)
Mine expansion equipment (1,293) — — (1,293) — — — — (1,293)
Fadougou relocation (1,762) — — (1,762) — — — — (1,762)
Plant expansion (2,682) — — (2,682) — — — — (2,682)
Masbate processing plant upgrade — (1,352) — (1,352) — — — — (1,352)
Other — (55) — (55) — — — — (55)
Limon Central — — — — (6,182) — (6,182) — (6,182)
Plant upgrade — — — — (162) — (162) — (162)
Limon tailings project — — — — (213) — (213) — (213)
Sustaining capital expenditures 7,088 6,113 17,221 30,422 4,381 10,556 14,937 — 45,359

The table below shows a reconciliation of sustaining mine exploration to operating mine exploration as extracted from the unaudited condensed interim consolidated financial statements for the three months ended June 30, 2019:

For the three months ended June 30, 2019
Fekola<br> Mine Masbate<br> Mine Otjikoto<br> Mine Total from Continuing Operations El Limon<br> Mine La Libertad<br> Mine Total from Disc. Operations Calibre equity investment Grand<br> Total
$ $ $ $ $ $ $ $ $
Operating mine exploration 6,215 1,103 533 7,851 743 748 1,491 — 9,342
Regional exploration — (1,077) (88) (1,165) (743) (400) (1,143) — (2,308)
Sustaining mine exploration 6,215 26 445 6,686 — 348 348 — 7,034

The tables below show a reconciliation of all-in sustaining costs per ounce to production costs as extracted from the unaudited condensed interim consolidated financial statements on a consolidated and a mine-by-mine basis for the six months ended June 30, 2020:

For the six months ended June 30, 2020
Fekola<br> Mine Masbate<br> Mine Otjikoto<br> Mine Corporate Total Calibre equity investment<br> Mine Grand<br> Total
$ $ $ $ $ $ $
Production costs 88,321 63,211 37,011 — 188,543 13,114 201,657
Royalties and production taxes 42,093 8,971 5,901 — 56,965 1,002 57,967
Corporate administration 2,306 1,113 2,272 12,559 18,250 1,601 19,851
Share-based payments – RSUs/DSUs/PSUs^(1)^ — — — 5,325 5,325 — 5,325
Community relations 1,743 429 2,054 — 4,226 — 4,226
Reclamation liability accretion^(2)^ 216 194 159 — 569 — 569
Realized losses on derivative contracts 1,323 1,364 694 — 3,381 — 3,381
Sustaining lease expenditures 387 718 195 345 1,645 — 1,645
Sustaining capital expenditures^(3)^ 30,535 9,079 21,794 — 61,408 1,070 62,478
Sustaining mine exploration^(3)^ 5,041 3,628 958 — 9,627 492 10,119
Total all-in sustaining costs 171,965 88,707 71,038 18,229 349,939 17,279 367,218
Gold sold (ounces) 317,500 90,400 88,700 — 496,600 15,852 512,452
All-in sustaining cost per ounce ($/ gold ounce sold) 542 981 801 — 705 1,090 717

^(1) Included as a component of Share-based payments on the statement of operations.^

^(2) Excludes reclamation accretion relating to Kiaka.^

^(3) Refer to Sustaining capital expenditures and Sustaining mine exploration reconciliations below.^

The table below shows a reconciliation of sustaining capital expenditures to operating mine capital expenditures as extracted from the unaudited condensed interim consolidated financial statements for the six months ended June 30, 2020:

For the six months ended June 30, 2020
Fekola<br> Mine Masbate<br> Mine Otjikoto<br> Mine Total Calibre equity investment Grand<br> Total
$ $ $ $ $ $
Operating mine capital expenditures 126,473 9,290 22,652 158,415 1,070 159,485
Mine expansion equipment (47,960) — — (47,960) — (47,960)
Plant expansion (28,723) — — (28,723) — (28,723)
Solar plant (17,786) — — (17,786) — (17,786)
Other (1,469) (49) (15) (1,533) — (1,533)
Land acquisitions — (162) — (162) — (162)
Underground development — — (843) (843) — (843)
Sustaining capital expenditures 30,535 9,079 21,794 61,408 1,070 62,478

The table below shows a reconciliation of sustaining mine exploration to operating mine exploration as extracted from the unaudited condensed interim consolidated financial statements for the six months ended June 30, 2020:

For the six months ended June 30, 2020
Fekola<br> Mine Masbate<br> Mine Otjikoto<br> Mine Total Calibre equity investment Grand<br> Total
$ $ $ $ $ $
Operating mine exploration 5,041 3,628 1,023 9,692 492 10,184
Regional exploration — — (65) (65) — (65)
Sustaining mine exploration 5,041 3,628 958 9,627 492 10,119

The tables below show a reconciliation of all-in sustaining costs per ounce to production costs as extracted from the unaudited condensed interim consolidated financial statements on a consolidated and a mine-by-mine basis for the six months ended June 30, 2019:

For the six months ended June 30, 2019
Fekola<br> Mine Masbate<br> Mine Otjikoto<br> Mine Corporate Total from Continuing Operations El Limon<br> Mine La Libertad<br> Mine Total from Disc. Operations Calibre equity investment Grand<br> Total
$ $ $ $ $ $ $ $ $ $
Production costs 85,624 62,647 39,879 — 188,150 20,833 45,840 66,673 — 254,823
Royalties and production taxes 23,697 8,015 3,794 — 35,506 1,804 1,172 2,976 — 38,482
Corporate administration 3,225 2,114 3,171 17,938 26,448 1,252 948 2,200 — 28,648
Share-based payments – RSUs/DSUs^(1)^ 41 — — 3,362 3,403 — — — — 3,403
Community relations 394 277 472 — 1,143 709 270 979 — 2,122
Reclamation liability accretion^(2)^ 342 282 245 — 869 217 400 617 — 1,486
Realized gains on derivative contracts (925) (908) (575) — (2,408) — (20) (20) — (2,428)
Sustaining lease expenditures 388 574 190 349 1,501 — — — — 1,501
Sustaining capital expenditures^(3)^ 16,276 10,760 24,503 — 51,539 8,394 14,907 23,301 — 74,840
Sustaining mine exploration^(3)^ 8,310 184 699 — 9,193 — 881 881 — 10,074
Total all-in sustaining costs 137,372 83,945 72,378 21,649 315,344 33,209 64,398 97,607 — 412,951
Gold sold (ounces) 222,000 112,500 72,600 — 407,100 21,195 40,063 61,258 — 468,358
All-in sustaining cost per ounce ($/ gold ounce sold) 619 746 997 — 775 1,567 1,607 1,593 — 882

^(1) Included as a component of Share-based payments on the statement of operations.^

^(2) Excludes reclamation accretion relating to Kiaka and Toega.^

^(3) Refer to Sustaining capital expenditures and Sustaining mine exploration reconciliations below^

The table below shows a reconciliation of sustaining capital expenditures to operating mine capital expenditures as extracted from the unaudited condensed interim consolidated financial statements for the six months ended June 30, 2019:

For the six months ended June 30, 2019
Fekola<br> Mine Masbate<br> Mine Otjikoto<br> Mine Total from Continuing Operations El Limon<br> Mine La Libertad<br> Mine Total from Discontinued Operations Calibre equity investment Grand<br> Total
$ $ $ $ $ $ $ $ $
Operating mine capital expenditures 34,113 15,964 24,503 74,580 18,367 14,907 33,274 — 107,854
Mobile equipment purchases (4,880) — — (4,880) — — — — (4,880)
Mine expansion equipment (1,293) — — (1,293) — — — — (1,293)
Fadougou relocation (6,612) — — (6,612) — — — — (6,612)
Carryover construction costs (1,738) — — (1,738) — — — — (1,738)
Plant expansion (3,314) — — (3,314) — — — — (3,314)
Masbate processing plant upgrade — (5,122) — (5,122) — — — — (5,122)
Other — (82) — (82) — — — — (82)
Limon Central — — — — (9,378) — (9,378) — (9,378)
Plant Upgrade — — — — (321) — (321) — (321)
Limon tailings project — — — — (274) — (274) — (274)
Sustaining capital expenditures 16,276 10,760 24,503 51,539 8,394 14,907 23,301 — 74,840

The table below shows a reconciliation of sustaining mine exploration to operating mine exploration as extracted from the unaudited condensed interim consolidated financial statements for the six months ended June 30, 2019:

For the six months ended June 30, 2019
Fekola<br> Mine Masbate<br> Mine Otjikoto<br> Mine Total from Continuing Operations El Limon<br> Mine La Libertad<br> Mine Total from Disc. Operations Calibre equity investment Grand<br> Total
$ $ $ $ $ $ $ $ $
Operating mine exploration 8,310 2,065 864 11,239 1,208 1,894 3,102 — 14,341
Regional exploration — (1,881) (165) (2,046) (1,208) (1,013) (2,221) — (4,267)
Sustaining mine exploration 8,310 184 699 9,193 — 881 881 — 10,074

^.^

Adjusted net income and adjusted earnings per share - basic

Adjusted net income and adjusted earnings per share – basic are non-IFRS measures that do not have a standardized meaning prescribed by IFRS and therefore may not be comparable to similar measures presented by other issuers. The Company defines adjusted net income as net income attributable to shareholders of the Company adjusted for non-recurring and significant recurring non-cash items. The Company defines adjusted earnings per share – basic as adjusted net income divided by the basic weighted number of common shares outstanding.

Management believes that the presentation of adjusted net income and adjusted earnings per share - basic is appropriate to provide additional information to investors regarding items that we do not expect to continue at the same level in the future or that management does not believe to be a reflection of the Company's ongoing operating performance. Management further believes that its presentation of these non-IFRS financial measures provide information that is useful to investors because they are important indicators of the strength of our operations and the performance of our core business. Accordingly, it is intended to provide additional information and should not be considered in isolation as a substitute for measures of performance prepared in accordance with IFRS. Other companies may calculate this measure differently.

A reconciliation of net income to adjusted net income as extracted from the unaudited condensed interim consolidated financial statements is set out in the table below:

Three months ended Six months ended
June 30, June 30,
2020 2019 2020 2019
$ $ $ $
(000’s) (000’s) (000’s) (000’s)
Net income attributable to shareholders of the Company for the period: 124,446 37,904 196,733 60,199
Adjustments for non-recurring and significant recurring non-cash items:
Share-based payments 7,394 6,640 10,994 11,249
Write-down of mineral property interests — 1,217 — 1,217
COVID-19 relief donations 2,752 — 2,752 —
Unrealized (gains) losses on derivative instruments (6,840) 4,613 4,008 (831)
Non-cash modification of Calibre receivable — — 689 —
Deferred income tax (recovery) expense (8,668) (1,734) 2,797 8,384
Adjusted net income attributable to shareholders of the Company for the period 119,084 48,640 217,973 80,218
Basic weighted average number of common shares outstanding (in thousands) 1,040,661 1,008,345 1,037,847 1,004,897
Adjusted net earnings attributable to shareholders of the Company per share–basic ($/share) 0.11 0.05 0.21 0.08

SUMMARY OF QUARTERLY RESULTS

Q2 Q1 Q4 Q3 Q2 Q1 Q4 Q3
2020 2020 2019 2019 2019 2019 2018 2018
Gold revenue ($ in thousands) 441,939 380,298 313,659 310,783 267,213 263,982 230,910 280,044
Net income (loss) for the period ($ in thousands) 137,961 83,008 182,413 65,583 41,322 26,523 (49,676) 16,036
Earnings (loss) per share ^(1)^ – basic ($) 0.12 0.07 0.17 0.05 0.04 0.02 (0.06) 0.01
Earnings (loss) per share ^(1)^ – diluted ($) 0.12 0.07 0.17 0.05 0.04 0.02 (0.06) 0.01
Cash flows from operating activities ($ in thousands) 238,089 216,213 144,905 167,834 92,816 86,419 74,145 143,235
Gold sold, excluding discontinued operations (ounces) 257,100 239,500 211,800 208,900 203,700 203,400 188,029 232,209
Average realized gold price ($/ ounce) 1,719 1,588 1,481 1,488 1,312 1,298 1,233 1,209
Gold produced, excluding discontinued operations (ounces) 239,574 250,632 228,406 213,278 208,890 200,542 201,601 206,947
Gold produced, total including discontinued operations and Calibre Equity Investment (ounces) 241,593 264,862 245,140 258,200 246,020 230,859 231,687 242,040
Cash operating costs ^(2)^ ($/ gold ounce sold) 383 405 479 507 543 545 507 496
Total cash costs ^(2)^ ($/ gold ounce sold) 498 516 579 603 624 629 590 571
All-in sustaining costs ^(2)^ ($/ gold ounce sold) 712 721 882 807 914 848 812 717
Adjusted net income ^(1)(2)^ ($ in thousands) 119,084 98,889 68,759 88,747 48,640 31,578 3,197 38,132
Adjusted earnings per share ^(1)(2)^– basic ($) 0.11 0.10 0.07 0.09 0.05 0.03 0.00 0.04

^1.^^Attributable to the shareholders of the Company.^

^2.^^Non-IFRS Measure. For a description of how these measures are calculated and a reconciliation of these measures to the most directly comparable measures specified, defined or determined under IFRS and presented in the Company’s financial statements, refer to “Non-IFRS Measures”.^

Quarterly gold revenue throughout the eight quarters is a function of quarterly production levels, the timing of bullion shipments and changes in average realized gold price while cash flows from operating activities are also impacted by cash operating costs of each quarter and changes in working capital, in addition to the factors noted for gold revenue. The net loss in the fourth quarter of 2018 reflects an impairment loss of $34 million relating to La Libertad Mine and $9 million of mineral property interest write-downs. The net income in the fourth quarter of 2019 reflects an impairment reversal of $70 million related to the Masbate Mine, net of deferred income tax expense and the gain on sale of Nicaraguan Assets of $40 million. The results of the first and second quarters of 2020 reflect the increased production from the Fekola Mine as result of the mining expansion.

SUMMARY AND OUTLOOK

Based on current assumptions for 2020, B2Gold remains well positioned for continued strong operational and financial performance. Total consolidated production guidance remains at between 1,000,000 and 1,055,000 ounces of gold; consolidated cash operating costs are forecast to be between $415 and $455 per ounce and consolidated all-in sustaining costs are forecast to be between $780 and $820 per ounce. The Company remains on guidance even though Calibre Mining Corp. (approximately 34% owned by B2Gold) provided revised reduced 2020 production guidance following the temporary suspension of its Nicaraguan operations due to COVID-19. The Company is on schedule to realize a significant increase in gold production from the Fekola Mine in 2020 (approximately 600,000 ounces) based on the addition of a larger mining fleet, the optimization of the mining sequence and the mill expansion. B2Gold's construction team is on schedule to complete the Fekola mill expansion in the third quarter of 2020, which along with the larger mining fleet will significantly increase mill throughput, yielding projected annual production averaging 550,000 ounces of gold over the next five years based on current assumptions.

In the second quarter of 2020, the Company reached a strategic milestone. The Company achieved a net cash position of $157 million as at June 30, 2020, with its cash and cash equivalents of $628 million exceeding its debt balances of $471 million. Based on current assumptions, including the continued strong operating performance at each of the Company's mines and no significant unforeseen work stoppages having been incurred due to COVID-19, the Company now intends to repay the entire drawn balance of $425 million under its RCF by the end of the third quarter of 2020 and finish 2020 in a strong cash position. Due to the Company's strong net positive cash position, strong operating results and the current higher gold price environment, the quarterly dividend rate was again increased by 100% to $0.04 per common share (or an annual rate of $0.16 per common share), which will become effective upon approval and declaration of the third quarter dividend.

Despite some of the challenges that the current COVID-19 pandemic has created in each of the locations where the Company operates or is head-quartered, the Company continues to operate virtually unimpeded. The Company is very of proud of its employees' dedication and resilience in these challenging times and believes it is in part due to the executive team's and mine

employees' years of experience in all aspects of international mining, and B2Gold's culture of fairness, respect and transparency. That resilience is reflected in the Company's results from the first half of 2020.

In conjunction with this success, we are also very mindful of the communities where we operate and continue to assist local and national governments in their efforts to respond to the COVID-19 crisis. During the second quarter of 2020, the Company donated a total of $3 million of COVID-19 relief to assist the communities in which it operates, including contributions in Mali, Namibia, the Philippines, Burkina Faso, Colombia and Canada. B2Gold would like to thank all levels of government in the countries for working with the Company in mutually trusting relationships during these challenging times.

In addition, to managing its operations through these current challenging times, B2Gold will also look forward through the balance of 2020 and beyond and remain committed to continuing to execute on its strategic objectives. The Company's ongoing strategy is to continue to maximize profitable production from its mines, reduce debt, expand the Fekola Mine throughput and annual production, further advance its pipeline of development and exploration projects, evaluate opportunities and continue to pay a dividend. In connection with advancing its pipeline of development projects, the Company still expects to have a feasibility study for the Gramalote Project completed by the end of the first quarter of 2021. In addition, the Company is evaluating the best course of action to advance the Kiaka Project, due to improved economics resulting from lower fuel prices, different power options and a higher gold price. The Company is currently updating its model and is considering its options to advance the project, including, but not limited to, bringing on a strategic partner to develop the project.

OUTSTANDING SHARE DATA

At August 5, 2020, 1,045,277,729 common shares were outstanding. In addition, there were approximately 22 million stock options outstanding with exercise prices ranging between Cdn.$1.12 to Cdn.$7.14 per share, approximately 4.7 million RSUs outstanding and approximately 1.7 million PSUs outstanding.

CAUTION ON FORWARD-LOOKING INFORMATION

Production results and production guidance presented in this MD&A reflect the total production at the mines B2Gold operates on a 100% basis. Please see our most recent Annual Information Form for a discussion of our ownership interest in the mines B2Gold operates. In respect of La Libertad and El Limon mines, production is presented on a 100% basis for the period up until October 14, 2019 and on a 34% basis thereafter (to reflect B2Gold's current approximate interest in Calibre).

This MD&A includes certain “forward-looking information” and “forward-looking statements” (collectively “forward-looking statements”) within the meaning of applicable Canadian and United States securities legislation, including: projections; outlook; guidance; forecasts; estimates; and other statements regarding future or estimated financial and operational performance events, gold production and sales, revenues and cash flows, capital and operating costs, including projected cash operating costs and all-in sustaining costs, and budgets, on a consolidated and mine-by-mine basis; the impact of the COVID-19 pandemic on B2Gold’s operations, including any restrictions or suspensions with respect to our operations and the effect of any such restrictions or suspensions on our financial and operational results; the ability of the Company to successfully maintain our operations if they are temporarily suspended, and to restart or ramp-up these operations efficiently and economically, the impact of COVID-19 on the Company’s workforce, suppliers and other essential resources and what effect those impacts, if they occur, would have on its business; future or estimated mine life, metal price assumptions, ore grades and sources, recovery rates, stripping ratios, throughput, ore processing; statements regarding anticipated exploration, drilling, development, construction, permitting and other activities or achievements of B2Gold; and including, without limitation: B2Gold remaining well positioned for continued strong operational and financial performance in 2020; projected consolidated gold production of between 1,000,000 and 1,055,000 ounces in 2020; projected consolidated cash operating costs of between $415 and $455 per ounce and all-in sustaining costs of between $780 and $820 per ounce in 2020; the anticipated repayment of the outstanding RCF balance in 2020; future debt levels; the realization of a significant increase in gold production from Fekola in 2020; the completion of the mill expansion at Fekola and the timing, results and costs thereof; the Fekola expansion being expected to increase gold production to an average of 550,000 ounces per year during the five-year period 2020-2024; the anticipated cost, timing and results for the addition of a solar plant to the Fekola Mine, including the timing to complete following restart of construction; production levels and B2Gold's attributable share of production of El Limon and La Libertad; the results of the Gramalote PEA; the completion and results of a feasibility study at Gramalote and its potential to become a large low-cost open pit gold mine; the availability of future takedowns under the RCF; the RCF and operating cash flows allowing B2Gold to meet its current obligations as they come due and providing financial flexibility to advance existing assets and pursue exploration opportunities; the potential payment of future dividends, including the timing and amount of any such dividends; planned exploration, the potential results of such exploration and the expected budgets, methods, targets and locations of such exploration; and B2Gold remaining focused on reducing debt. Estimates of mineral resources and reserves are also forward-looking statements because they constitute projections regarding the amount of minerals that may be encountered in the future and/or the anticipated economics of production, should a production decision be made. All statements in this MD&A that address events or developments that we expect to occur in the future are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, although not always, identified by words such as “expect”, “plan”, “anticipate”, “project”, “target”, “potential”, “schedule”, “forecast”, “budget”, “estimate”, “intend” or “believe” and similar expressions or their negative connotations, or that events or conditions “will”, “would”, “may”, “could”, “should” or “might” occur. All such forward-looking statements are based on the opinions and estimates of management as of the date such statements are made.

Forward-looking statements necessarily involve assumptions, risks and uncertainties, certain of which are beyond B2Gold’s control, including risks associated with or related to: the duration and extent of the COVID-19 pandemic, the effectiveness of preventative measures and contingency plans put in place by the Company to respond to the COVID-19 pandemic, including, but not limited to, social distancing, a non-essential travel ban, business continuity plans, and efforts to mitigate supply chain disruptions; escalation of travel restrictions on people or products and reductions in the ability of the Company to transport and refine doré; the volatility of metal prices and B2Gold’s common shares; changes in tax laws; the dangers inherent in exploration, development and mining activities; the uncertainty of reserve and resource estimates; not achieving production, cost or other estimates; actual production, development plans and costs differing materially from the estimates in B2Gold’s feasibility studies; the ability to obtain and maintain any necessary permits, consents or authorizations required for mining activities; and the ramifications thereof; environmental regulations or hazards and compliance with complex regulations associated with mining activities; climate change and climate change regulations; the ability to replace mineral reserves and identify acquisition opportunities; the unknown liabilities of companies acquired by B2Gold; the ability to successfully integrate new acquisitions; fluctuations in exchange rates; the availability of financing; financing and debt activities, including potential restrictions imposed on B2Gold’s operations as a result thereof and the ability to generate sufficient cash flows; operations in foreign and developing countries and the compliance with foreign laws, including those associated with operations in Mali, Namibia, the Philippines, Colombia and Burkina Faso and including risks related to changes in foreign laws and changing policies related to mining and local ownership requirements or resource nationalization generally, including in response to the COVID-19 outbreak; remote operations and the availability of adequate infrastructure; fluctuations in price and availability of energy and other inputs necessary for mining operations; shortages or cost increases in necessary equipment, supplies and labour; regulatory, political and country risks, including local instability or acts of terrorism and the effects thereof; the reliance upon contractors, third parties and joint venture partners; the lack of sole decision-making authority related to Filminera Resources Corporation, which owns the Masbate Mine; challenges to title or surface rights; the dependence on key personnel and the ability to attract and retain skilled personnel; the risk of an uninsurable or uninsured loss; adverse climate and weather conditions; litigation risk; competition with other mining companies; community support for B2Gold’s operations, including risks related to strikes and the halting of such operations from time to time; conflicts with small scale miners; failures of information systems or information security threats; the final outcome of the audit by the Philippines Department of Environment and Natural Resources in relation to the Masbate Project; the outcome of the ongoing tax assessment by the Colombian Tax Office (DIAN) in respect of the Gramalote Project; the ability to maintain adequate internal controls over financial reporting as required by law, including Section 404 of the Sarbanes-Oxley Act; compliance with anti-corruption laws and sanctions or other similar measures; social media and B2Gold's reputation; risks affecting Calibre having an impact on the value of the Company's investment in Calibre, including the impact of the temporary suspension of operations in Nicaragua and withdrawal of Calibre's annual forecasted gold production and potential dilution of B2Gold's interest in Calibre; as well as other factors identified and as described in more detail under the heading “Risk Factors” in B2Gold’s most recent Annual Information Form, B2Gold’s current Form 40-F Annual Report and B2Gold’s other filings with Canadian securities regulators and the U.S. Securities and Exchange Commission (the “SEC”), which may be viewed at www.sedar.com and www.sec.gov, respectively (the “Websites”). The list is not exhaustive of the factors that may affect B2Gold’s forward-looking statements.

B2Gold’s forward-looking statements are based on the applicable assumptions and factors management considers reasonable as of the date hereof, based on the information available to management at such time. These assumptions and factors include, but are not limited to, assumptions and factors related to B2Gold’s ability to carry on current and future operations, including: the duration and effects of COVID-19 on our operations and workforce; development and exploration activities; the timing, extent, duration and economic viability of such operations, including any mineral resources or reserves identified thereby; the accuracy and reliability of estimates, projections, forecasts, studies and assessments; B2Gold’s ability to meet or achieve estimates, projections and forecasts; the availability and cost of inputs; the price and market for outputs, including gold; foreign exchange rates; taxation levels; the timely receipt of necessary approvals or permits; the ability to meet current and future obligations; the ability to obtain timely financing on reasonable terms when required; the current and future social, economic and political conditions; and other assumptions and factors generally associated with the mining industry.

B2Gold’s forward-looking statements are based on the opinions and estimates of management and reflect their current expectations regarding future events and operating performance and speak only as of the date hereof. B2Gold does not assume any obligation to update forward-looking statements if circumstances or management’s beliefs, expectations or opinions should change other than as required by applicable law. There can be no assurance that forward-looking statements will prove to be accurate, and actual results, performance or achievements could differ materially from those expressed in, or implied by, these forward-looking statements. Accordingly, no assurance can be given that any events anticipated by the forward-looking statements will transpire or occur, or if any of them do, what benefits or liabilities B2Gold will derive therefrom. For the reasons set forth above, undue reliance should not be placed on forward-looking statements.

CAUTIONARY STATEMENT REGARDING MINERAL RESERVE AND RESOURCE ESTIMATES

The disclosure in this MD&A was prepared in accordance with Canadian National Instrument 43-101 (“NI 43-101”), which differs significantly from the current requirements of the SEC set out in Industry Guide 7. Accordingly, such disclosure may not be comparable to similar information made public by companies that report in accordance with Industry Guide 7. In particular, this MD&A may refer to “mineral resources,” "indicated mineral resources" or “inferred mineral resources”. While these categories of mineralization are recognized and required by Canadian securities laws, they are not recognized by Industry Guide 7 and have not historically been permitted to be disclosed in SEC filings by U.S. companies. U.S. investors are cautioned not to assume that

any part of a “mineral resource,” "indicated mineral resource" or “inferred mineral resource” will ever be converted into a “reserve.” In addition, “reserves” reported by the Company under Canadian standards may not qualify as reserves under Industry Guide 7. Under Industry Guide 7, mineralization may not be classified as a “reserve” unless the mineralization can be economically and legally extracted or produced at the time the “reserve” determination is made. Accordingly, information contained or referenced in this MD&A containing descriptions of the Company’s mineral deposits may not be compatible to similar information made public by U.S. companies subject to the reporting and disclosure requirements of Industry Guide 7. “Inferred mineral resources” have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Further, while NI 43-101 permits companies to disclose economic projections contained in preliminary economic assessments and pre-feasibility studies, which are not based on "reserves", U.S. companies subject to Industry Guide 7 have not generally been permitted to disclose economic projections for a mineral property in their SEC filings prior to the establishment of "reserves." Disclosure of “contained ounces” in a resource is permitted disclosure under Canadian reporting standards; however, Industry Guide 7 normally only permits issuers to report mineralization that does not constitute “reserves” by Industry Guide 7 standards as in-place tonnage and grade without reference to unit measures. Historical results or feasibility models presented herein are not guarantees or expectations of future performance.

QUALIFIED PERSONS

Bill Lytle, Senior Vice President of Operations, a qualified person under NI 43-101, has reviewed and approved the disclosure of all other scientific and technical information related to operation matters contained in this MD&A. Tom Garagan, Senior Vice President of Exploration, a qualified person under NI 43-101, has approved the scientific and technical information regarding exploration matters contained in this MD&A.

37

Document

Form 52-109F2

Certification of Interim Filings

Full Certificate

I, Clive Johnson, President and Chief Executive Officer of B2Gold Corp., certify the following:

1. Review: I have reviewed the interim financial report and interim MD&A (together, the “interim filings”) of B2Gold Corp. (the “issuer”) for the interim period ended June 30, 2020.

2. No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.

3. Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.

4. Responsibility: The issuer’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers’ Annual and Interim Filings, for the issuer.

5. Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer’s other certifying officer(s) and I have, as at the end of the period covered by the interim filings

(a) designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that

(i)material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and

(i)information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and

(b) designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP.

5.1 Control framework: The control framework the issuer’s other certifying officer(s) and I used to design the issuer’s ICFR is the Internal Control-Integrated Framework published by The Committee of Sponsoring Organizations of the Treadway Commission.

5.2 ICFR – material weakness relating to design: N/A

5.3 Limitation on scope of design: N/A.

6. Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer’s ICFR that occurred during the period beginning on January 1, 2020 and ended on June 30, 2020 that has materially affected, or is reasonably likely to materially affect, the issuer’s ICFR.

Date: August 5, 2020

/s/ Clive Johnson
Clive Johnson
President and CEO

Document

Form 52-109F2

Certification of Interim Filings

Full Certificate

I, Michael Cinnamond, Chief Financial Officer of B2Gold Corp., certify the following:

1. Review: I have reviewed the interim financial report and interim MD&A (together, the “interim filings”) of B2Gold Corp. (the “issuer”) for the interim period ended June 30, 2020.

2. No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.

3. Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.

4. Responsibility: The issuer’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers’ Annual and Interim Filings, for the issuer.

5. Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer’s other certifying officer(s) and I have, as at the end of the period covered by the interim filings

(a) designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that

(i)material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and

(i)information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and

(b) designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP.

5.1 Control framework: The control framework the issuer’s other certifying officer(s) and I used to design the issuer’s ICFR is the Internal Control-Integrated Framework published by The Committee of Sponsoring Organizations of the Treadway Commission.

5.2 ICFR – material weakness relating to design: N/A

5.3 Limitation on scope of design: N/A.

6. Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer’s ICFR that occurred during the period beginning on January 1, 2020 and ended on June 30, 2020 that has materially affected, or is reasonably likely to materially affect, the issuer’s ICFR.

Date: August 5, 2020

/s/ Michael Cinnamond
Michael Cinnamond
Chief Financial Officer