Denison Mines Corp 6-K, filed Apr 19, 2023
Denison Mines Corp. (DNN)
6-K
2023-04-19
For: 2023-04-19
View Original
Added on
April 07, 2026
About this 6-K
Denison Mines Corp filed this 6-K on April 19, 2023.
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE
13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934
Date: April 19, 2023
Commission File Number: 001-33414
Denison Mines Corp.
(Name of
registrant)
1100-40 University Avenue
Toronto Ontario
M5J 1T1 Canada
(Address of
principal executive offices)
Indicate by check mark whether the registrant files
or will file annual reports under cover Form 20-F or Form
40-F.
Form
20-F ☐ Form 40-F ☒
Indicate by check mark if the registrant is submitting the
Form 6-K in paper as permitted by Regulation S-T Rule
101(b)(1): ☐
Indicate by check mark if the registrant is submitting the
Form 6-K in paper as permitted by Regulation S-T Rule
101(b)(7): ☐
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act
of 1934, the registrant has duly caused this report to be signed on
its behalf by the undersigned, thereunto duly
authorized.
|
|
|
|
|
|
|
|
|
|
|
|
|
DENISON MINES
CORP.
|
||
|
|
|
|
||||
|
|
|
|
|
/s/ Amanda Willett
|
||
|
Date: April
19, 2023
|
|
|
|
Amanda
Willett
|
||
|
|
|
|
|
Vice
President Legal and Corporate Secretary
|
||
FORM 6-K
EXHIBIT INDEX
|
Exhibit Number
|
|
Description
|
|
|
|
|
|
99.1
|
|
Press release dated
April 18, 2023 |
|
99.2
|
|
Press release dated
April 19, 2023 |
Exhibit 99.1
![]() |
Denison Mines
Corp.
1100 – 40
University Ave
Toronto, ON M5J
1T1
www.denisonmines.com
@DenisonMinesCo
|
PRESS
RELEASE
Denison
Releases 2022 ESG Report,
Highlighting
Progress on Environmental, Social and Governance
Initiatives
Toronto, ON – April 18, 2023
Denison Mines Corp. (‘Denison’ or the
‘Company’) (TSX: DML; NYSE American: DNN) is pleased to
announce that it has published its 2022 ESG Report. Annually,
Denison provides a report on its environmental, social and
governance (‘ESG’) initiatives for its operations,
demonstrating the Company’s ongoing commitment to
sustainability and transparency.
David Cates,
President and CEO of Denison commented, “Denison has positioned
itself to be an important contributor to the global clean energy
transition, with our portfolio of uranium mining, development and
exploration projects clearly linked to growing appreciation of the
critically important role that nuclear energy must play in the
battle against climate change.
As just one example of our efforts in 2022, we achieved a notable
milestone in the permitting process for the planned Phoenix in-situ
recovery mining project on the Wheeler River property with the
submission of a draft Environmental Impact Statement
(‘EIS’), which follows from several years of baseline
environmental data collection, technical assessments, and extensive
engagement and consultation with Indigenous and non-Indigenous
interested parties. The draft EIS demonstrates that the project can
be constructed, operated, and decommissioned in a manner that has
fewer residual effects remaining after mitigation than conventional
open pit or underground mining and milling operations –
potentially achieving a superior standard of environmental
sustainability and re-shaping the future of uranium mining in
Saskatchewan.
Our 2022 ESG Report demonstrates
that the principles of good ESG practices are present throughout
our organization, providing a solid foundation for our future
growth and contribution to a clean energy
future.”
Denison’s
2022 ESG Report focuses on key ESG topics including the
Company’s objective to maintain excellence in corporate
governance practices, “best in class” engagement with
communities potentially impacted by its activities, diversity in
the Company’s workforce, and robust assessments of the
environment and biodiversity in the regions within which it
operates.
A copy of
Denison’s 2022 ESG Report is available on its website:
https://denisonmines.com/investors/esg-reports/
About Denison
Denison is a uranium exploration and development company with
interests focused in the Athabasca Basin region of northern
Saskatchewan, Canada. The Company has an effective 95% interest in
its flagship Wheeler River Uranium Project, which is the largest
undeveloped uranium project in the infrastructure rich eastern
portion of the Athabasca Basin region of northern Saskatchewan. A
Pre-Feasibility Study was completed for Wheeler River in late 2018,
considering the potential economic merit of developing Phoenix as
an in-situ recovery (‘ISR’) operation and the Gryphon
deposit as a conventional underground mining operation.
Denison’s interests in Saskatchewan also include a 22.5%
ownership interest in the McClean Lake Joint Venture, which
includes several uranium deposits and the McClean Lake uranium
mill, which is contracted to process the ore from the Cigar Lake
mine under a toll milling agreement, plus a 25.17% interest in the
Midwest Main and Midwest A deposits and a 67.41% interest in the
Tthe Heldeth Túé (‘THT’, formerly J Zone) and
Huskie deposits on the Waterbury Lake property. The Midwest Main,
Midwest A, THT and Huskie deposits are located within 20 kilometres
of the McClean Lake mill.
Through its 50% ownership of JCU, Denison holds additional
interests in various uranium project joint ventures in Canada,
including the Millennium project (JCU, 30.099%), the Kiggavik
project (JCU, 33.8118%) and Christie Lake (JCU,
34.4508%).
Denison’s exploration portfolio includes further interests in
properties covering ~300,000 hectares in the Athabasca Basin
region.
Denison is also engaged in post-closure mine care and maintenance
services through its Closed Mines group, which manages
Denison’s reclaimed mine sites in the Elliot Lake region and
provides related services to certain third-party
projects.
For more information, please contact
|
David
Cates
|
(416) 979-1991
ext. 362
|
|
President &
Chief Executive Officer
|
|
|
|
|
|
Mac
McDonald
|
(416) 979-1991
ext. 242
|
|
Executive Vice
President & Chief Financial Officer
|
|
|
|
|
|
Follow Denison on
Twitter
|
@DenisonMinesCo
|
CAUTIONARY
STATEMENT REGARDING FORWARD-LOOKING STATEMENTS
Certain
information contained in this press release constitutes
‘forward-looking information’, within the meaning of
the applicable United States and Canadian legislation concerning
the business, operations and financial performance and condition of
Denison.
Generally, these
forward-looking statements can be identified by the use of
forward-looking terminology such as ‘plans’,
‘expects’, ‘budget’,
‘scheduled’, ‘estimates’,
‘forecasts’, ‘intends’,
‘anticipates’, or ‘believes’, or the
negatives and/or variations of such words and phrases, or state
that certain actions, events or results ‘may’,
‘could’, ‘would’, ‘might’ or
‘will be taken’, ‘occur’, ‘be
achieved’ or ‘has the potential to’.
In particular,
this press release contains forward-looking information pertaining
to: projections with respect to exploration, development and
expansion plans and objectives, including the scope of the proposed
ISR operation for the Phoenix deposit; expectations regarding the
role of uranium and nuclear energy; expectations regarding
Denison’s joint venture ownership interests; and expectations
regarding the continuity of its agreements with third
parties.
Forward looking
statements are based on the opinions and estimates of management as
of the date such statements are made, and they are subject to known
and unknown risks, uncertainties and other factors that may cause
the actual results, level of activity, performance or achievements
of Denison to be materially different from those expressed or
implied by such forward-looking statements. Denison believes that
the expectations reflected in this forward-looking information are
reasonable, but no assurance can be given that these expectations
will prove to be accurate and results may differ materially from
those anticipated in this forward-looking information. For a
discussion in respect of risks and other factors that could
influence forward-looking events, please refer to the factors
discussed in the Company’s Annual Information Form dated
March 27, 2023 under the heading ‘Risk Factors’. These
factors are not, and should not be, construed as being
exhaustive.
Accordingly,
readers should not place undue reliance on forward-looking
statements. The forward-looking information contained in this press
release is expressly qualified by this cautionary statement. Any
forward-looking information and the assumptions made with respect
thereto speaks only as of the date of this press release. Denison
does not undertake any obligation to publicly update or revise any
forward-looking information after the date of this press release to
conform such information to actual results or to changes in
Denison's expectations except as otherwise required by applicable
legislation.
Exhibit 99.2
![]() |
Denison Mines
Corp.
1100 – 40
University Ave
Toronto, ON M5J
1T1
www.denisonmines.com
|
PRESS
RELEASE
Denison
Announces Discovery of
High-Grade Uranium Mineralization at Moon Lake
South
Toronto, ON – April 19,
2023. Denison Mines Corp. (“Denison” or the
“Company”) (DML: TSX, DNN: NYSE American) is pleased to
report that drill hole MS-23-10A intersected 1.38% eU3O8
over 8.7
metres (0.05%
eU3O8
cut-off), including a sub-interval
grading 2.88% eU3O8
over 3.1
m, intersected approximately 30
m above the unconformity in the Athabasca sandstone, as part of the
recently completed winter exploration program at the Moon Lake
South property (“Moon South”).
Uranium
mineralization was encountered in four of the six drill holes
completed during the 2023 winter exploration program, which was
designed to evaluate the strike length of low-grade mineralized
occurrences identified in the 2021 and 2016 drill programs. Figure
1 and Figure 2 depict the location of the Moon Lake South project,
and the significant drill results on the project to date,
respectively.
Andy Yackulic, P. Geo., Denison’s Director,
Exploration, commented, “The
discovery of high-grade uranium mineralization at Moon Lake South
gives further proof that the CR-3 trend has the potential to host a
large, high-grade unconformity-associated uranium deposit. The fact
that this high-grade material lies approximately 30 metres above
the unconformity contact is very encouraging – as perched
mineralization like this is typically only found proximal to
high-grade unconformity-hosted deposits.”
David Cates, Denison’s President & CEO
added, “The
discovery of high-grade sandstone-hosted uranium mineralization at
Moon Lake South is a very exciting development for Denison, as our
Company’s recent field testing at the nearby 95%-owned
Wheeler River project has illustrated the potential viability of
mining high-grade Athabasca Basin sandstone-hosted uranium deposits
via In-Situ Recovery (ISR) mining.”
2023 Moon South Winter Exploration Program Highlights
The
2023 winter exploration program consisted of six completed diamond
drill holes totalling 3,301 metres, designed to evaluate the
potential to expand the footprint of known mineralization
discovered in 2016 and 2021 by testing conductivity anomalies
identified from the 2022 stepwise moving loop electromagnetic (SWML
EM) survey.
Uranium
mineralization was encountered in four of the six drill holes
completed during the winter exploration program. The mineralized
intersections are summarized in Table 1.
Table 1 – Mineralized Intersections – 2023 Moon Lake
South Winter Exploration Drilling
|
Drill Hole
|
Orientation (azi./dip)
|
From (m)
|
To (m)
|
Length (m)(1)
|
eU3O8 (%)(2,3)
|
|
MS-23-09
|
311°/-80.0°
|
408.45
|
408.65
|
0.2
|
0.06
|
|
MS-23-09
|
311°/-80.0°
|
451.45
|
451.95
|
0.5
|
0.12
|
|
MS-23-10A
|
311°/-81.5°
|
417.75
|
426.45
|
8.7
|
1.38
|
|
Including(4)
|
|
421.45
|
424.55
|
3.1
|
2.88
|
|
MS-23-10A
|
311°/-81.5°
|
430.85
|
432.05
|
1.2
|
0.07
|
|
MS-23-10AD1
|
311°/-81.5°
|
441.05
|
441.35
|
0.3
|
0.07
|
|
MS-23-11
|
309°/-81.5°
|
450.75
|
450.95
|
0.2
|
0.07
|
Notes:
(1)
Lengths indicated represent the down-hole length of mineralized
intersections.
(2)
Radiometric equivalent U3O8 ("eU3O8")
derived from a calibrated gamma downhole probe
(3)
Mineralized interval is composited above a cut-off grade of 0.05%
eU3O8
(4)
Mineralized interval is composited above a cut-off grade of 2.00%
eU3O8
The most significant mineralization was returned
from hole MS-23-10A, which intersected a broad zone of high-grade
mineralization grading 1.38% eU3O8
over 8.7 metres, associated with
strong grey alteration, located approximately 30 metres above the
sub-Athabasca unconformity. Given the limited number of drill holes
completed during the winter program, the mineralization discovered
in MS-23-10A remains open in multiple directions for future
follow-up.
Radiometric Equivalent Grades, Sampling, Analysis and Data
Verification
Following the completion of a drill hole, the hole
is radiometrically logged using a downhole gamma probe, which
collects continuous readings of radioactivity along the length of
the drill hole. Probe results are then calibrated using an
algorithm calculated from the comparison of probe results against
geochemical analyses in the area. The gamma-log results provide an
immediate radiometric equivalent uranium value
(eU3O8%)
for the hole, which, except in very high-grade zones, is reasonably
accurate. The Company typically reports eU3O8,
as a preliminary result and subsequently reports definitive assay
grades following sampling and chemical analysis of the mineralized
drill core.
Assay
sample intervals are generally 50 centimetres long, except where
higher or lower-grade mineralization boundaries fall within the
interval. In that case, two 25 centimetre samples are collected.
Flank samples of 1.0 metre are always collected where
mineralization is located. Systematic geochemistry samples are
collected every 10 metres down the hole.
All
assayed core is split in half, with one half retained and the other
sent to the Saskatchewan Research Council Geoanalytical Laboratory
in Saskatoon for analysis. Control samples are routinely assayed
with each batch of core samples analyzed.
About Moon Lake South
The
Moon Lake South project is a joint venture between Denison Mines
Corp., which holds a 75% interest in the property, and CanAlaska
Uranium Ltd., which holds the remaining 25% interest. Denison acts
as the project operator.
The
project lands are located in the southeastern part of the Athabasca
basin, approximately 12 kilometres southwest of Denison's Phoenix
deposit, and 30 kilometres northwest of Cameco’s Key Lake
Operation. The property is accessible year-round via the Fox Lake
tote road, allowing Denison’s exploration team to use the
nearby Wheeler River camp as a base of operations.
About Denison
Denison is a uranium exploration and development company with
interests focused in the Athabasca Basin region of northern
Saskatchewan, Canada. The Company has an effective 95% interest in
its flagship Wheeler River Uranium Project, which is the largest
undeveloped uranium project in the infrastructure rich eastern
portion of the Athabasca Basin region of northern Saskatchewan.
Denison's interests in Saskatchewan also include a 22.5% ownership
interest in the McClean Lake joint venture, which includes several
uranium deposits and the McClean Lake uranium mill that is
contracted to process the ore from the Cigar Lake mine under a toll
milling agreement, plus a 25.17% interest in the Midwest Main and
Midwest A deposits, and a 67.41% interest in the Tthe Heldeth
Túé (“THT,” formerly J Zone) and Huskie
deposits on the Waterbury Lake property. The Midwest Main, Midwest
A, THT and Huskie deposits are each located within 20 kilometres of
the McClean Lake mill.
Through its 50% ownership of JCU, Denison holds additional
interests in various uranium project joint ventures in Canada,
including the Millennium project (JCU 30.099%), the Kiggavik
project (JCU 33.8118%) and Christie Lake (JCU 34.4508%). Denison's
exploration portfolio includes further interests in properties
covering ~300,000 hectares in the Athabasca Basin
region.
Denison is also engaged in post-closure mine care and maintenance
services through its Closed Mines group, which manages Denison's
reclaimed mine sites in the Elliot Lake region and provides related
services to certain third-party projects.
For more information, please contact
|
David
Cates
|
(416) 979-1991 ext
362
|
|
President and Chief Executive
Officer
|
|
|
|
|
|
Mac McDonald
|
(416) 979-1991 ext
242
|
|
Exec. Vice President &
Chief Financial Officer
|
|
|
|
|
|
Follow Denison on
Twitter
|
@DenisonMinesCo
|
The technical information contained in this release has been
reviewed and approved by Mr. Andrew Yackulic, P. Geo., Denison's
Director, Exploration, who is a Qualified Person in accordance with
the requirements of NI 43-101.
Cautionary Statement Regarding Forward-Looking
Statements
Certain information contained in this news release constitutes
‘forward-looking information’, within the meaning of
the applicable United States and Canadian legislation, concerning
the business, operations and financial performance and condition of
Denison.
Generally, these forward-looking statements can be identified by
the use of forward-looking terminology such as ‘plans’,
‘expects’, ‘budget’,
‘scheduled’, ‘estimates’,
‘forecasts’, ‘intends’,
‘anticipates’, or ‘believes’, or the
negatives and/or variations of such words and phrases, or state
that certain actions, events or results ‘may’,
‘could’, ‘would’, ‘might’ or
‘will be taken’, ‘occur’, ‘be
achieved’ or ‘has the potential to’.
In particular, this news release contains forward-looking
information pertaining to the following: the interpretation of
exploration results and expectations with respect thereto,
including the interpretation of the results from the Moon Lake
South exploration program; and expectations regarding its joint
venture ownership interests and the continuity of its agreements
with its partners.
Forward looking statements are based on the opinions and estimates
of management as of the date such statements are made, and they are
subject to known and unknown risks, uncertainties and other factors
that may cause the actual results, level of activity, performance
or achievements of Denison to be materially different from those
expressed or implied by such forward-looking statements. For
example, the modelling and assumptions upon which the
interpretation of results are based may not be maintained after
further testing or be representative of actual conditions. Denison
believes that the expectations reflected in this forward-looking
information are reasonable but no assurance can be given that these
expectations will prove to be accurate and results may differ
materially from those anticipated in this forward-looking
information. For a discussion in respect of risks and other factors
that could influence forward-looking events, please refer to the
factors discussed in Denison’s Annual Information Form dated
March 27, 2023 or subsequent quarterly financial reports under the
heading ‘Risk Factors’. These factors are not, and
should not be construed as being exhaustive.
Accordingly, readers should not place undue reliance on
forward-looking statements. The forward-looking information
contained in this news release is expressly qualified by this
cautionary statement. Any forward-looking information and the
assumptions made with respect thereto speaks only as of the date of
this news release. Denison does not undertake any obligation to
publicly update or revise any forward-looking information after the
date of this news release to conform such information to actual
results or to changes in Denison's expectations except as otherwise
required by applicable legislation.
Figure 1 – Moon Lake South Project - Location

Figure 2 – Moon Lake South Project – 2023 Winter
Drilling Results