6-K

FEC Resources Inc. (FECOF)

6-K 2024-11-29 For: 2024-09-30
View Original
Added on April 06, 2026

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

Form 6-K

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16

UNDER THE SECURITIES EXCHANGE ACT OF 1934

For the month of November 2024

Commission File Number 000-17729

FEC RESOURCES INC.

| (Translation of registrant’s name into English) |

Suite 2300, Bentall 5

550 Burrard Street

Vancouver, British Columbia

Canada V6C 2B5

(Address of principal executive office)

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F ☐     Form 20-F  ☒

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): ____

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): ____

Exhibits

Exhibit 1 Unaudited condensed financial statements of FEC Resources Inc. for the three-and-nine-month periods ended September 30, 2024 and 2023
Exhibit 2 Management Discussion and Analysis of Financial Condition and Results of Operations for the nine months ended September 30, 2024 of FEC Resources Inc.
Exhibit 3 Certification of September 30, 2024, interim filings – CEO
Exhibit 4 Certification of September 30, 2024, interim filings – CFO
Exhibit 5 Press release dated October 1, 2024
2

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

FEC Resources Inc.

| | (Registrant) | | | Date: November 29, 2024 | By: | /s/ Daniel Carlos |

| | | Daniel Carlos |

| | | President and Chief Executive Officer |

3

fecof_ex1.htm EXHIBIT 1

FEC RESOURCES INC.

Condensed Interim Financial Statements


For the nine months ended September 30, 2024

(Expressed in United States Dollars)

Unaudited

NOTICE OF NO AUDITOR REVIEW OF INTERIM FINANCIAL STATEMENTS

The accompanying unaudited condensed financial statements for FEC have been prepared by management in accordance with International Financial Reporting Standards.  These financial statements, which are the responsibility of management are unaudited and have not been reviewed by the Company’s auditors. The Company’s Audit Committee and Board of Directors has reviewed and approved these interim financial statements.

The Company’s independent auditor has not performed a review of these interim condensed financial statements in accordance with the disclosure requirements of National Instrument 51-102 released by the Canadian Securities Administrators.

FEC RESOURCES INC.

CONDENSED STATEMENT OF FINANCIAL POSITION

Expressed in United States Dollars

UNAUDITED

As at: September 30 December 31

| | 2024 | | | 2023 | | |

ASSETS

| Cash | $ | 32,483 | | $ | 7,406 | |

| Prepaid expenses | | 13,130 | | | 9,236 | |

| | | 45,613 | | | 16,642 | |

| Non-current assets | | | | | | |

| Investment in Forum Energy Limited (Note 9) | | 9,601,766 | | | 2,461,931 | |

Total assets $ 9,647,379 $ 2,478,573
Current liabilities

| Trade and accrued payables | $ | 56,199 | | $ | 17,049 | |

| Short term loan (Note 6) | | 826,649 | | | 678,155 | |

| | | 882,848 | | | 695,204 | |

| Shareholders’ Equity | | | | | | |

| Share capital (Note 5) | | 17,620,625 | | | 17,620,625 | |

| Contributed surplus (Note 5) | | 3,058,063 | | | 3,058,063 | |

| Accumulated other comprehensive income (Note 9) | | 7,139,835 | | | - | |

| Deficit | | (19,053,992 | ) | | (18,895,319 | ) |

| Total shareholders’ equity | | 8,764,531 | | | 1,783,369 | |

| Total liabilities and equity | $ | 9,647,379 | | $ | 2,478,573 | |

SIGNED ON BEHALF OF THE BOARD OF DIRECTORS BY:

Daniel Carlos Paul Wallace

| Director | Director |

The accompanying notes to the interim condensed financial statements are an integral part of these statements.

1

FEC RESOURCES INC.

CONDENSED STATEMENTS OF COMPREHENSIVE LOSS

Expressed in United States Dollars

UNAUDITED

Three Month Period Ended Nine Month Period Ended

| | Sept. 30, 2024 | | | Sept. 30, 2023 | | | Sept. 30, 2024 | | | Sept. 30, 2023 | | |

| General and administration expenses | | | | | | | | | | | | |

| General and administration (Note 7) | $ | 40,717 | | $ | 33,768 | | $ | 113,465 | | $ | 112,070 | |

| Operating loss | | (40,717 | ) | | (33,768 | ) | | (113,465 | ) | | (112,070 | ) |

| Interest expense (Note 6) | | (16,297 | ) | | (8,414 | ) | | (45,208 | ) | | (20,954 | ) |

| Loss for the period | $ | (57,014 | ) | $ | (42,182 | ) | $ | (158,673 | ) | $ | (133,024 | ) |

| Other comprehensive income (loss) | | | | | | | | | | | | |

| Items that will not be reclassified to profit or loss: | | | | | | | | | | | | |

| Changes in fair value of investment (Note 9) | | - | | | - | | | 7,139,835 | | | - | |

Comprehensive income (loss) $ (57,014 ) $ (42,182 ) 6,981,162 $ (133,024 )

| - Basic and diluted | $ | (0.00 | ) | $ | (0.00 | ) | $ | (0.00 | ) | $ | (0.00 | ) |

The accompanying notes to the condensed interim financial statements are an integral part of these statements.

2

FEC RESOURCES INC.

CONDENSED INTERIM STATEMENTS OF CHANGES IN EQUITY

Expressed In United States Dollars

UNAUDITED

For the nine months ended September 30, 2024

Share capital Contributed surplus Accumulated other comprehensive income Deficit Total
Balance December 31, 2023 $ 17,620,625 $ 3,058,063 - $ (18,895,319 ) $ 1,783,369

| Total comprehensive loss for the period | | - | | - | | - | | (158,673 | ) | | (158,673 | ) |

| Accumulated other comprehensive income | | - | | - | | 7,139,835 | | - | | | 7,139,835 | |

| Balance Sept. 30, 2024 | $ | 17,620,625 | $ | 3,058,063 | | 7,139,835 | $ | (19,053,992 | ) | $ | 8,764,531 | |

For the nine months ended September 30, 2023

Share capital Contributed surplus Deficit Total
Balance December 31, 2022 $ 17,620,625 $ 3,058,063 $ (18,703,524 ) $ 1,975,164

| Total comprehensive loss  for the period | | - | | - | | (133,024 | ) | | (133,024 | ) |

| Balance Sept. 30, 2023 | $ | 17,620,625 | $ | 3,058,063 | $ | (18,836,548 | ) | $ | 1,842,140 | |

The accompanying notes to the condensed interim financial statements are an integral part of these statements.


3

FEC RESOURCES INC.

CONDENSED STATEMENTS OF CASH FLOWS

Expressed in United States Dollars

UNAUDITED


For the nine months ended

| | Sept. 30 | | | Sept. 30 | | |

| | 2024 | | | 2023 | | |

| Cash provided by (used in) | | | | | | |

| OPERATING ACTIVITIES | | | | | | |

| Net loss for the period | $ | (158,673 | ) | $ | (133,024 | ) |

| Changes in working capital related to operating activities | | | | | | |

| Prepaid expenses | | (3,894 | ) | | (4,520 | ) |

| Accrued interest expense | | 45,208 | | | 20,954 | |

| Accounts payable and accrued liabilities | | 39,150 | | | 2,972 | |

Net cash used in operating activities (78,209 ) (113,618 )

| Loan from PXP Energy Corporation | | 103,286 | | | 110,000 | |

| Net cash provided by financing activity | | 103,286 | | | 110,000 | | | Net (decrease) increase in cash | | 25,077 | | | (3,618 | ) |

| Cash – beginning of the period | | 7,406 | | | 13,068 | |

| Cash – end of the period | $ | 32,483 | | $ | 9,450 | |

The accompanying notes to the condensed interim financial statements are an integral part of these statements.

4

FEC RESOURCES INC.

NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS (UNAUDITED)

September 30, 2024

(Stated in United States Dollars)

Note 1 Corporate Information
FEC Resources Inc. (“FEC” or the “Company”) was incorporated under the laws of Alberta, Canada and is a holding Company with an interest in Forum Energy Limited (“FEL”).  The Company is listed in the United States on the OTC Pink (“OTC Pink”), having the symbol FECOF.<br> <br><br> <br>As at September 30, 2024, the Company has a 6.8% interest in FEL. (Note 8).<br> <br><br> <br>The principal address of the Company is Suite 2300, Bentall 5, 550 Burrard Street, Vancouver, BC, V6C 2B5. The Company’s ultimate parent company is PXP Energy Corporation (“PXP”) with a registered office at 2/F LaunchPad, Reliance corner Sheridan Streets, Mandaluyong City 1550, Metro Manila, Philippines.
Note 2 Basis of Preparation
a) Statement of Compliance
These condensed interim financial statements of the Company have been prepared in accordance with International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board (“IASB”).  The financial statements have been prepared in accordance with IAS 34, Interim Financial Reporting and have been prepared using the same accounting policies and methods as were used for the Company’s Annual Financial Statements for the year ended December 31, 2023.  These condensed interim financial statements should be read in conjunction with the Company’s annual financial statements dated December 31, 2023.<br> <br><br> <br>The condensed interim financial statements were authorized for issue by the Board of Directors on November 28, 2024.
b) Basis of Measurement
The financial statements have been prepared on a historical cost basis except for certain financial instruments measured at fair value described in the applicable notes and are presented in United States dollars, which is also the Company’s functional currency.<br> <br><br> <br>The preparation of financial statements in compliance with IFRS requires management to make certain critical accounting estimates. It also requires management to exercise judgment in applying the Company’s accounting policies.  The areas involving a higher degree of judgment or complexity, or areas where assumptions and estimates are significant to the financial statements are disclosed in Note 3.
5

FEC RESOURCES INC.

NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS (UNAUDITED)

September 30, 2024

(Stated in United States Dollars)

Note 2 Basis of Preparation (continued)
c) Nature of Operations and Going Concern
As a holding company with an interest in FEL, the Company’s business is indirectly subject to risks inherent in oil and gas exploration and development operations. In addition, there are risks associated with FEL’s stage of operations and the foreign jurisdiction in which it or FEL may operate or invest. The Company has identified certain risks pertinent to its investment including: exploration and reserve risks, uncertainty of reserve estimates, ability to exploit successful discoveries, drilling and operating risks, title to properties, costs and availability of materials and services, capital markets and the requirement for additional capital, market perception, loss of or changes to production sharing, joint venture or related agreements, economic, political and sovereign risks, possibility of less developed legal systems, corporate and regulatory formalities, environmental regulation, reliance on strategic relationships, market risk, competition, dependence on key personnel, volatility of future oil and gas prices and foreign currency risk. The Company has an accumulated deficit since inception of $19,053,992.<br> <br><br> <br>Management considers that the current economic environment is difficult and the outlook for holding companies investing in oil and gas exploration companies presents significant challenges in terms of raising funds through issuance of shares. To the extent necessary, the Company has relied on its ability to raise funds via dispositions of quantities of its shareholdings in FEL to PXP under terms that are consistent with the best interests of shareholders, in order to finance its operations. The Company has been successful in disposing quantities of its shareholdings in FEL in previous fiscal years. However, there can be no assurance the Company will continue to be able to dispose of quantities of its shares in FEL under suitable terms.  Currently management has no plans to sell any additional FEL shares.<br> <br><br> <br>Since the delisting of FEL from the London Stock Exchange, there is no liquidity via a public market for the FEL shares.  As the Company is wholly reliant on the information disclosed by PXP concerning the business of FEL, the Company may not be able to obtain information necessary to facilitate a wider sales process.  The continuation of the Company is dependent upon its ability to raise funds via dispositions of quantities of its shareholdings in FEL to PXP under terms that are consistent with the best interests of shareholders, or obtain loans from PXP.  Also, the Company may issue new shares to PXP and/or other third parties.<br> <br><br> <br>Management has concluded that the combination of these circumstances gives rise to a material uncertainty that casts substantial doubt on the ability of the Company to continue as a going concern; therefore, the Company may be unable to realize its assets and discharge its liabilities in the normal course of business.
6

FEC RESOURCES INC.

NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS (UNAUDITED)

September 30, 2024

(Stated in United States Dollars)

Note 3 Summary of Material Accounting Policies and Critical Accounts Estimates and Judgments
These interim condensed financial statements have been prepared using the same accounting policies and methods of computation as the annual financial statements for the year ended December 31, 2023. In addition, these interim condensed financial statements have been prepared using the same critical accounting estimates and judgments as the annual financial statements for the year ended December 31, 2023 except for the valuation of  the Company’s interest in FEL. Accordingly, the interim condensed financial statements should be read in conjunction with the financial statements for the year ended December 31, 2023.<br> <br><br> <br>The valuation of the Company’s interest in FEL is a critical accounting estimate and judgement (Note 9).
Note 4 Standards, Amendments and Interpretations
The Company has prepared its financial statements in accordance with IFRS as issued by the International Accounting Standards Board (“IASB”). IFRS represents standards and interpretations approved by the IASB and are comprised of IFRS, International Accounting Standards (“IAS’s”), and interpretations issued by the IFRS Interpretations Committee (“IFRIC’s”) and the former Standing Interpretations Committee (“SIC’s”). The financial statements have been prepared in accordance with IFRS standards and interpretations effective as of September 30, 2024.
Note 5 Share Capital
a) Authorized:
The Company is authorized to issue an unlimited number of common shares without par value; and<br> <br><br> <br>The Company is authorized to issue an unlimited number of Class A and Class B preferred convertible redeemable voting shares without par value.<br> <br><br> <br>Issued:
Common Shares Number Amount

| Balance Sept. 30, 2024 and December 31, 2023 | | 861,082,371 | $ | 17,620,625 |

No preferred shares have been issued since the Company’s inception.

7

FEC RESOURCES INC.

NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS (UNAUDITED)

September 30, 2024

(Stated in United States Dollars)

Note 5 Share Capital (continued)
b) Nature and Purpose of Equity and Reserves
Contributed Surplus is used to recognize the value of stock option grants prior to exercise.<br> <br><br> <br>Deficit is used to record the Company’s change in deficit from earnings and losses from period to period.<br> <br><br> <br>Accumulated Other Comprehensive Income is used to record the change in fair value of the Company’s investment in FEL from period to period.
Note 6 Related Party Transactions and Balances
The Company considers its officers (CEO and CFO) and directors to be key management. Key management are those persons having authority and responsibility for planning, directing, and controlling activities, directly or indirectly, of the Company.
(i) During the quarter ended September 30, 2024, general and administrative expenses included key management personnel compensation totaling $36,000 (2023: $36,000).
(ii) As at September 30, 2024, the outstanding PXP Loan balance was $826,649 (December 31, 2023 - $678,155), which included accrued interest of $88,443 (December 31, 2023 - $43,235). Total interest expense for the quarter was $45,208.
Note 7 General and Administrative Expenses
Nine Months<br> <br>Ended<br> <br>Sept. 30, 2024 Nine Months Ended<br> <br>Sept. 30, 2023

| Professional fees | $ | 14,403 | $ | 7,523 |

| Bank charges | | 528 | | 98 |

| Listing and filing fees | | 18,397 | | 22,390 |

| Office and miscellaneous | | 14,082 | | 16,735 |

| Consulting (Note 6) | | 64,802 | | 65,148 |

| Foreign exchange | | 1,253 | | 176 |

| | $ | 113,465 | $ | 112,070 |

8

FEC RESOURCES INC.

NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS (UNAUDITED)

September 30, 2024

(Stated in United States Dollars)

Note 8 Loss Per Share
Weighted Average Number of Common Shares
Three Months Ended Sept. 30, 2024 Three Months Ended Sept 30, 2023

| Professional fees | $ | 3,196 | $ | 616 |

| Bank charges | | 144 | | 242 |

| Listing and filing fees | | 10,334 | | 5,346 |

| Office and miscellaneous | | 4,729 | | 4,862 |

| Consulting (Note 6) | | 21,601 | | 21,730 |

| Foreign exchange | | 713 | | 972 |

| | $ | 40,717 | $ | 33,768 |

Sept. 30, 2024 Sept. 30, 2023

| Weighted average number of common shares (basic and diluted) | | 861,082,371 | | 861,082,371 |

Note 9 Investment in FEL
i) Investment in FEL
The investment in FEL is summarized as follows:
Shares Amount

| Balance December 31, 2023 | | 8,206,638 | $ | 2,461,931 |

| Change in fair value | | - | | 7,139,835 |

| Balance Sept. 30, 2024 | | 8,206,638 | | 9,601,766 |

As at September 30, 2024, the Company’s interest in FEL was 6.80% (December 31, 2023: 6.80%).<br> <br><br> <br>FEL’s assets consist of interests in various petroleum service contracts (SC) in the Philippines, the most significant of which in terms of Prospective Resources is SC 72. On March 2, 2015, the Philippine Department of Energy (“DOE”) granted a force majeure on SC 72 because the contract area falls within the territorial disputed area of the West Philippine Sea. Under the terms of the force majeure, all exploration work at SC 72 was immediately suspended until the DOE notified PXP that it could re-commence exploration. On October 16, 2020, FEL received a letter from the DOE lifting the force majeure and directing FEL to resume exploration activities on SC 72.  On April 11, 2022, force majeure was once again declared on SC 72 as a result of FEL not receiving clearance from Security, Justice and Peace Coordinating Cluster to proceed after preparations for drilling were underway.<br> <br><br> <br>Determination of fair value<br> <br><br> <br>The investment in FEL represents an investment in a private company for which there is no active market and for which there are no publicly available quoted market prices.
9

FEC RESOURCES INC.

NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS (UNAUDITED)

September 30, 2024

(Stated in United States Dollars)

The Company has classified its investment in FEL as Level 2 in the fair value hierarchy.<br> <br><br> <br>For purposes of determining fair value of the investment in FEL, the Company considered valuation techniques described in IFRS 13 – Fair Value Measurement. In respect of the investment in FEL, management considered the fair value of $9,601,766 to be indicative of the fair value of the investment in FEL as on May 17, 2024 PXP disclosed that the company was undertaking a share swap with Tidemark Holdings Limited (“Tidemark”) whereby PXP would exchange PXP shares for all FEL shares held by Tidemark at a value of US$1.17 per share (430,243,903 PXP shares at PHP3.62). The fair value of the investment is consistent with the implied value based on the May 10, 2024 share swap between PXP and Tidemark, which is a Level 2 input.
Note 10 Segmental Reporting
The Company has one reportable operating segment which is primarily the business of exploration and development of oil and gas and other mineral related opportunities, through companies in which the Company invests.
Note 11 Subsequent Events
Subsequent to quarter end, the Company received additional loans from PXP amounting to $52,000 for working capital under the PXP Loan.
10

fecof_ex2.htm EXHIBIT 2

FEC RESOURCES INC. (the “Company”)

MANAGEMENT DISCUSSION AND ANALYSIS

OF FINANCIAL POSITION AND RESULTS OF OPERATIONS

FOR THE QUARTER ENDED SEPTEMBER 30, 2024

(all funds in US dollars unless otherwise stated)

THE FOLLOWING MANAGEMENT DISCUSSION AND ANALYSIS (“MD&A”) IS PROVIDED AS OF NOVEMBER 28, 2024, AND SHOULD BE READ IN CONJUNCTION WITH THE CONDENSED UNAUDITED INTERIM FINANCIAL STATEMENTS AND NOTES FOR THE PERIOD ENDED SEPTEMBER 30, 2024, AND THE AUDITED FINANCIAL STATEMENTS AND NOTES FOR THE YEAR ENDED DECEMBER 31, 2023. THOSE FINANCIAL STATEMENTS HAVE BEEN PREPARED IN ACCORDANCE WITH INTERNATIONAL FINANCIAL REPORTING STANDARDS (“IFRS”) AS ISSUED BY THE INTERNATIONAL ACCOUNTING STANDARDS BOARD (“IASB”).

FORWARD-LOOKING STATEMENTS

Certain statements in this MD&A, including statements regarding the Company’s current funds on hand being able to secure the Company for the foreseeable future, and the Company’s ability to raise new money by way of loans or the issuance of new shares to meet its working capital needs and future plans and objectives of the Company are forward-looking information that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate; actual results and future events could differ materially from those anticipated in such statements. Material risk factors that could cause actual results to differ materially from the forward-looking information include unforeseen expenses which the Company may incur and which expenses could cause current funds on hand to not be adequate to secure the Company for the foreseeable future, or arrange debt or equity financing if required to meet working capital needs and other risks and uncertainties as disclosed under the heading “Risk Factors” herein. The Company has assumed that it would not be incurring significant expenses in the short term that would exceed its current funds on hand. The reader is also cautioned that should Forum Energy Limited (“FEL”) find it necessary to raise capital to fund its current and future business, the Company’s interest in FEL may be diluted because the Company may not have the resources to participate if provided the opportunity to do so.  The reader is also cautioned that assumptions used in the preparation of such information, while considered reasonable by the Company at the time, may prove to be incorrect.The Company has no policy for updating forward-looking information beyond the procedures required under applicable securities laws.

Overall Performance

Forum Energy Limited (“FEL”)

As at September 30, 2024, the Company held 8,206,638 shares (8,206,638 shares at December 31, 2023), representing a 6.80% interest of the capital of FEL, a privatecompany, which hasparticipating interests in six (6) oil and gas blocks in the Philippines through various subsidiaries.  FEL’s subsidiaries are Forum Energy Philippines Corporation (“FEPC”), Forum (GSEC 101) Limited (“FGL”), and ForumPH SC72 Holdings, Inc. (“ForumPH”).  FEL and the Company are both ultimately under the control of PXP Energy Corporation (“PXP”) and, therefore, are affiliates.

1

The following information related to PXP or FEL has been provided to us by PXP or FEL, as we do not have direct knowledge of such information.

PXP holds a 77.88% controlling interest in FEL, with 72.55% held directly and 6.80% held indirectly through its 78.39% shareholding of the Company.  FEL is a company incorporated under the laws of England and Wales with focus on the Philippines and has: (a) a 70% operating interest in Service Contract (“SC”) 72 Recto Bank, which covers the Sampaguita natural gas discovery in offshore West Palawan, held through FGL; (b) minority interests in the SC 6 and SC 14 sub-blocks in offshore Northwest Palawan, including a 3.21% interest in the producing Galoc Field, held through FEPC; and (c) a 100% operating interest in SC 40 North Cebu held through FEPC’s 66.67%-held subsidiary, Forum Exploration Inc. (“FEI”).

A summary of FEL’s interests are as follows:

SC Block % interest Currently Producing

| SC 72 Recto Bank | | 70 | % | No |

| SC 40 North Cebu | | 66.67 | % | No |

| SC 14C-1 Galoc | | 3.21 | % | Yes |

| SC 14C-2 West Linapacan | | 9.10 | % | No |

| Octon New SC (former SC 6A)^(1)^ | | 6.84 | % | No |

| Cadlao New SC (former SC 6B Bonita)^(2)^ | | 2.45 | % | No |

| SC 14A Nido^(3)^ | | 8.47 | % | No |

| SC 14B Matinloc^(3)^ | | 12.41 | % | No |

| SC 14B-1 North Matinloc^(3)^ | | 19.46 | % | No |

| SC 14D Retention Area^(3)^ | | 8.16 | % | No |

| SC 14 Tara^(3)^ | | 10 | % | No |

^(1)^SC 6A was surrendered to the DOE on March 31, 2021, which was approved on September 5, 2022. The area was nominated for a new SC on March 17, 2023. This is currently under process with the DOE.

^(2)^The 50-year term of SC 6B expired on February 28, 2024. Prior to this, the Joint Venture applied for a new Service Contract on January 26, 2024. This is currently under process with the DOE.

^(3)^A Notice to Surrender of the blocks were issued by Operators Philodrill and AC Energy (for Tara) on February 16, 2021.  This was approved by the DOE on May 18, 2022.

Following is a brief description of the properties of FEL, together with production details where appropriate.

SC 72 Recto Bank

FEL’s principal asset is a 70% participating interest in SC 72 (previously Geophysical Survey and Exploration Contract No. 101 (“GSEC 101”)), a petroleum license located in the Recto Bank, offshore west of Palawan Island, the Philippines. The remaining 30% of SC 72 is owned by Monte Oro Resources & Energy Inc., a company incorporated in the Philippines, which is involved in a joint venture with FEL with respect to SC 72.

2

On February 15, 2010, the GSEC 101 license was converted to SC 72, and FEL immediately conducted geological and geophysical works to further evaluate the block and fulfill its commitment to the government. SC 72 covers 8,800 square kilometers, which is 85% of the area covered by GSEC 101.

Exploration in the area began in 1970, and in 1976, gas was discovered in the Sampaguita structure following the drilling of a well. To date, a total of three wells have been drilled at the southwest end of the structure. Two of the wells tested gas at rates warranting further exploration.

In early 2011, FEL acquired 2,202 line-km of 2D seismic, gravity, and magnetic data over SC 72 to further define previously mapped leads. Also, 565 square kilometers of 3D seismic data were acquired over the Sampaguita Field (the “Sampaguita 3D”). These fulfilled the Consortium’s minimum work obligation under Sub-Phase (“SP”) 1.

Based on a technical evaluation conducted by Weatherford Petroleum Consultants in 2012, the Sampaguita Field is estimated to contain 2.6 trillion cubic feet (TCF) of in-place contingent gas resources and 5.4 TCF of prospective gas resources.

The 2D seismic data were reprocessed in 2013 and were subsequently interpreted, aided by gravity-magnetics data that were analyzed by Fugro and Cosine Ltd. (“Cosine”) in 2012 and 2015, respectively. In 2015, Arex Energy produced a report on the North Bank Prospect, located northwest of the Sampaguita Field, and estimated the prospective resources to be significant enough to continue with the exploration of the concession.

In October 2018, FEL started the Broadband Pre-Stack Depth Migration (“PSDM”) reprocessing of the Sampaguita 3D seismic data with DownUnder GeoSolutions (“DUG”), a company based in Perth, Australia, as contractor. The reprocessing work was completed in June 2019.

In October 2019, the Philippines’ Department of Foreign Affairs (“DFA”) announced that the Philippines and China had officially convened an Intergovernmental Steering Committee to supervise projects under the two countries’ joint oil and gas exploration in the West Philippine Sea. The DFA further announced that the Steering Committee held its first meeting in Beijing on October 28, 2019. Under the Memorandum of Understanding (“MOU”) signed in October 2018, the Steering Committee will create one or more inter-Entrepreneurial Working Groups that will agree on entrepreneurial, technical, and commercial aspects of cooperation in certain areas in the West Philippine Sea. China has appointed China National Offshore Oil Corporation (“CNOOC”) as its representative to the Working Group(s). FEL will represent the Working Group for SC 72.

On October 16, 2020, FEL received notice from the Philippine Department of Energy (“DOE”) that the Force Majeure (“FM”) imposed on SC 72 on December 15, 2014, was lifted with immediate effect and that FEL was to resume exploration activities on SC 72.  FEL has 20 months from the date of lifting of the FM to drill two (2) commitment wells.  The total cost of drilling these wells depends on a number of factors. The Company’s management estimates the total work to be between US$70 million and US$100 million. It is important to note that, to date, there has been no announcement of any agreement between FEL and CNOOC in relation to SC 72.

3

Since then, the 2021 and 2022 work program and budget (“WP&B”) for SC 72 have been approved by the DOE. Preparations for drilling activities, including the purchase of long lead items (“LLIs”), the requisition for other materials, and the signing up of technical services, were undertaken for the conduct of geophysical and geotechnical surveys and the drilling of wells Sampaguita 4 and Sampaguita 5 starting the second quarter of 2022.

On April 6, 2022, FGL as operator under SC 72, received a directive from the DOE to put on hold all exploration activities for SC 72 until such time that the Security, Justice and Peace Coordinating Cluster (“SJPCC”) has issued the necessary clearance to proceed.  On April 11, 2022, as a result of not receiving the necessary clearance, Force Majeure was once again declared on SC 72.

On May 27, 2022, FGL, on behalf of the SC 72 Joint Venture, and Nido Petroleum Philippines Pty Ltd (“Nido”), Operator of SC 54 and SC 6B, signed a Term Sheet in which Nido agreed to purchase most of the SC 72 LLIs, such as wellheads, casings and accessories, conductor, drill bits, etc., for US$ 2.9 million, to be paid in installments within a twelve (12)-month period. A Sale and Purchase Agreement (“SPA”) with Nido was executed on June 10, 2022 to formalize the transaction.

In June 2022, media outlets reported that the MOU between China and the Philippines had been terminated although media outlets also reported that discussions would continue on joint exploration of SC 72.

On October 11, 2022, the DOE granted FGL the following: (i) the Declaration of Force Majeure for SC 72 from April 6, 2022, until such time as the same is lifted by the DOE, (ii) the inclusion of total expenses incurred as a result of the DOE directive to suspend activities as part of the approved recoverable costs, subject to DOE audit, and (iii) in addition to the period in item (i) above, FGL will be entitled to an extension of the exploration period under SC 72 corresponding to the number of days that the contractors actually spent in preparation for the activities that were suspended by the DOE’s suspension order on April 6, 2022.

On March 20, 2023, the DOE further affirmed that the entire period from October 14, 2020 (when the Force Majeure was lifted) to April 6, 2022 (when the same was re-imposed) will be credited back to SC 72.  Thus, once the Force Majeure is lifted, FGL will have 20 months to drill the two commitment wells, equivalent to the remaining term of SP 2 of SC 72 before October 14, 2020.

In May 2023, an amendment to the SPA between FGL and Nido was signed, granting Nido an extension to settle the remaining balance of the SC 72 LLIs’ purchase price. Following Nido’s full payment of the balance in early October 2023, FGL and Nido executed a Deed of Absolute Sale, finalizing the transfer of ownership of the LLIs to Nido.

On October 25, 2023, the WP&B for 2024, which includes the drilling of two (2) wells, was submitted to the DOE. The implementation of the drilling program is contingent upon the lifting of the force majeure on SC 72 and the issuance by the DOE, in coordination with other concerned Philippine Government agencies, of clearance to resume exploration activities.

4

SC 40 North Cebu

A 100% operating interest in SC 40 is held by FEPC’s 66.67% owned subsidiary FEI.

SC 40 is located in the Visayan Basin in the central part of the Philippine Archipelago and covers an area of 340,000 hectares in the northern part of Cebu Island and adjacent offshore areas. It contains the Libertad Gas Field and several prospects and leads.

A land gravity survey was conducted in the municipalities of Daanbantayan and Medellin from April 2 to 27, 2018. A total of 94 gravity stations were acquired at 200m to 500m spacing. The processing and interpretation of the gravity data was carried out in two (2) stages. The first stage is a 3D inverse grid depth modelling which was undertaken by contractor Cosine. This was completed in early 2019. The second stage is a detailed stratigraphic 3D multi-sectional model done in-house by the FEI technical team under Cosine’s quality control supervision.  During this stage, a number of possible carbonate bodies were identified in certain areas of the block. Delineating these features required additional data; thus, FEI conducted another gravity survey in the first quarter of 2020. The survey began on February 18, 2020, and was completed on March 14, 2020, with 84 stations, 300m to 500m apart, acquired along pre-determined gravity profiles.

After completing the correction of meter readings, coordinates, and elevations of gravity stations acquired during the survey, FEI forwarded the data to Cosine for data reduction, processing, and interpretation.

The report for the first phase of gravity interpretation was received from Cosine Ltd in early December 2020, and submitted to the DOE in February 2021 after its review by FEI’s technical team. The study’s second phase, which involved depth modeling and identification of gravity prospects and leads, was finalized in June 2022 and the final report was submitted to the DOE in July 2022.  The data acquired will be incorporated with the results of the previous gravity surveys and will be used to update the current depth model for northern Cebu.

In June 2022, FEI contracted a drilling consultant to prepare drilling programs and budgets for two (2) wells, one of which will be located in the Dalingding Prospect, a reef structure defined by seismic with the Late Miocene to Pliocene-age Barili Limestone as the primary target. A well, Dalingding-1, was drilled on this structure in 1996 and was plugged and abandoned as a dry hole with minor gas shows after reaching a total depth of 1,508 ft. FEI’s re-evaluation of the prospect concluded that the Dalingding-1 well did not reach the Barili target, which is currently estimated at 480 ft below the well’s final depth. FEI proposes drilling a new well, tentatively named Dalingding-2, down to 4,000 ft to reach the Barili Limestone and secondary targets underneath.

In August 2022, FEI contracted a third party to dispose the Hycalog Rig and ancillary equipment stored in Brgy. Maya, Daanbantayan, Cebu Province. The sale process started on September 13, 2022, of which a Luzon-based company offered the highest bid. The pullout of the items began in December 2022 and was completed in June 2023.

An independent technical evaluation involving a review of available data, project risk assessment, and project economics of the Maya and Dalingding Prospects started in the first quarter of 2023. The results indicate that deterministic and probabilistic volumetric estimates for the Dalingding Prospect show mean resources of 10 billion cubic feet (“BCF”) for a Gas Case and 3.5 million barrels (”MMBO”) for an Oil Case. The study was completed in March 2024.

5

As part of the Social Development Program commitment of SC 40 with the DOE, FEI conducted a school donation drive on September 1, 2023, at the Maya National High School (MNHS) in Daanbantayan, Cebu. A total of 1,050 school kits, consisting of basic study materials such as notebooks, pad papers, pens, pencils, water bottles, etc., were assembled for the students of the school. Some teaching materials were also given to the faculty.

On January 3, 2024, the DOE approved the work program and budget for 2024 that includes the conduct of a magnetotelluric (MT) survey over the Dalingding Prospect. The survey aims to define the top of the carbonate target and help determine its depth from surface.  The results will be used to further refine the Dalingding-2 drilling program.

MT equipment testing and data acquisition in Daanbantayan, Cebu commenced on June 14, 2024, and was completed on September 2, 2024. A total of 30 stations were acquired on two parallel lines oriented in a NW-SE direction, and 20 stations on one perpendicular line oriented in a NE-SW direction.

The MT survey set-up consisted of four electric field probes buried in north, east, west, and south directions, connected to a car battery-powered ADU-07e (recording unit) via a 20-50m cable. Daily data acquisition ran at one station per day for an average of 6 hours and 46 minutes. A quick quality control (“QC”) check was conducted at the end of the day to identify any potential issues or errors in the acquired data and to pinpoint stations that require resurveying.

Data processing and interpretation are expected to be completed by December 2024. The information obtained will be correlated with existing seismic, gravity, magnetic, and well data in the area and will also be used to refine the drilling program for the Dalingding Prospect.

SC 14 C-1 Galoc

Block C-1 Galoc has an area of 164 square kilometers and contains the Galoc Oil Field, which has already produced about 24.8 MMBO since it was put on stream in October 2008. Gross production for 2023 averaged 1,377 barrels of oil per day (“BOPD”) from 1,550 BOPD in 2022. Three (3) liftings with a total cargo of 475,183 barrels were delivered in January, May, and September, 2023.

From January to September 2024, the average production was 1,239 BOPD, which is 10% lower than the average production of 1,409 BOPD during the same period last year. There have been three liftings completed so far. The first lifting was completed on February 1, 2024, with a cargo size of 196,826 barrels, the second on April 29 with cargo size of 112,372 barrels, and the third commenced on September 30 and was completed on October 1, 2024, with a cargo size of 189,017 barrels. The field's profitability is expected to continue over the next 2-3 years, subject to effective cost management, operational efficiency, high oil prices, and sustained performance of the remaining production wells, Galoc-5 and Galoc-6.  FEPC has a 3.2103% participating interest in the block.

6

On May 7, 2020, GPC informed the DOE of the cessation of operations for Galoc Field, starting September 24, 2020. This followed GPC’s receipt of a Notice of Termination from Rubicon Offshore International (“ROI”), the owner of the floating production storage and offloading (“FPSO”) vessel, Rubicon Intrepid. GPC also requested approval of the initial drawdown from the fund set-up under the DOE-approved Galoc Decommissioning Plan (“DP”) for implementing the field suspension plan.  However, in September 2020, the Galoc Joint Venture (“JV”) negotiated with ROI to sell the Rubicon Intrepid, allowing the Galoc Field to continue production beyond the original cessation schedule of September 24, 2020. Tamarind Resources, which owned GPC, formed a new subsidiary, Philippines Upstream Infrastructure (PUI), to acquire the FPSO from ROI.  GPC and ROI then entered into a Transition Operations and Maintenance (“O&M”) contract to allow the current ROI crew to continue managing FPSO operations during a transition period of about six (6) months.  Finally, GPC signed a 24-month O&M contract with Three60 Energy, an energy services provider, to take over FPSO operations after the transition period.

On December 23, 2020, GPC resigned as the SC 14C-1 operator effective on that date. The JV elected NPG Pty Limited (“NPG”), GPC’s affiliate, on the same day to become the replacement operator.

On February 1, 2021, Three60 Energy formally assumed operational control of the FPSO, now called Intrepid Balanghai, following a transition period with Rubicon Offshore that lasted 4-1/2 months from September 2020 to January 2021.

In June 2021, upon the DOE’s request, NPG prepared a new DP that will be implemented once Galoc Field reaches its end of life. The new DP updated the 2016 Abandonment Plan and the 2020 Suspension & Abandonment Plan, which had already received DOE approval. The DP was submitted to the DOE on July 30, 2021. It documents the scope and associated cost of final field decommissioning, including the plans for the FPSO, subsea equipment, and production wells.  The decommissioning activity will cost around US$ 24 million, with US$ 9.5 million allocated for FPSO disconnection and subsea equipment abandonment, and US$ 14.5 million for the permanent plugging and abandonment (“P&A”) of the production wells.  The Galoc Field is forecasted to remain viable to operate even beyond the expiry date of SC 14C-1 in December 2025.

In January 2023, Matahio Energy completed the acquisition of two legal entities, the first being NPG Pty Ltd, which operates the Galoc Field.  In addition, Matahio acquired PUI, which owns the FPSO stationed in the Galoc Field, now renamed Intrepid Balanghai.  In March 2023, ownership of the FPSO was transferred directly from PUI to NPG.  Following this transfer, NPG (acting as a corporate entity and not in its capacity as SC 14C-1 Joint Venture Participant) entered into a new bareboat charter with the other JV Partners, including FEPC, for the purpose of continuing production operations at the Galoc Field.

In December 2023, the DOE released Department Circular (“DC”) no. 2023-12-0033 on the awarding of Development and Production Petroleum Service Contracts (“DP PSC”) through direct negotiations. It took effect on January 3, 2024.  The DP PSC covers expiring service contracts but with ongoing production or producible petroleum reserves as validated by the DOE. It will have an initial term aligned with the period necessary to produce the recoverable oil or gas reserves declared in the DOE-approved Plan of Development (“POD”). The contract may also be subject to renewal for an additional period based on mutually agreed terms and conditions.

7

SC 14C-1 qualifies for the issuance of a new DP PSC to continue production beyond December 2025, which is the end of the term of the SC.

Octon Block (former SC 6A)

In 2018, The Philodrill Corporation (“Philodrill”) completed the seismic interpretation/mapping work on the northern sector of the block using the PSDM 3D volume. The evaluation focused on the Malajon, Salvacion, and Saddle Rock prospects.  The Malajon and Saddle Rock closures were previously tested by wells that encountered good oil shows in the Galoc Clastic Unit (“GCU”) interval. However, no drill stem tests were conducted in this interval due to operational constraints.

The 2019 work program included the completion of seismic attribute analysis of the North Block of SC 6A to characterize the target reservoirs and determine their distribution in terms of porosity, thickness, and lithology.

For 2020, the DOE approved a work program that consists of G&G studies in support of establishing a final well location and well design to test the hydrocarbon potential of the Malajon-Salvacion-Saddle Rock anticlinorium and the continuation of G&G work to identify additional resources at the Octon South structure and other opportunities immediately around the Octon Field to support its development.

In June 2020, LMKR, a private petroleum technology company based in Dubai, completed a pilot study on the Malajon area using 3D seismic and well data. The study shows the Malajon structure has good hydrocarbon potential and thus requires further detailed analysis. LMKR also identified four (4) sand packages within the GCU after generating several elastic properties (P-impedance, Vp/Vs, etc.).

A more detailed Quantitative Interpretation (“QI”) study was approved by the JV aimed at generating pay probability maps and identifying prospective zones that could be targeted for any future wells. It also included detailed attribute analysis as several channelized sands within the GCU have been identified during the pilot study. An amended WP&B for 2020 to cover this additional study was approved by the DOE in July 2020.  The LMKR report was submitted to the DOE in July 2021.

SC 6A had an original term set to expire on February 28, 2024, leaving the Consortium with limited time to drill an exploratory well and to develop a field in case of a discovery. In view of this, the Consortium decided to surrender the contract effective March 31, 2021, and subsequently re-apply for a new contract under the Philippine Conventional Energy Contracting Program (“PCECP”) on area nomination.

The surrender of the SC was approved by the DOE on September 5, 2022, and on March 17, 2023, Philodrill submitted to the DOE the bid documents for the application for the new SC, which has now been termed Nominated Area No. 10 by the DOE. FEPC will have a participating interest of 6.8439% in the new SC.

8

On May 15, 2023, during a preliminary review, the DOE confirmed the completeness of the technical, legal, and financial documents submitted by the JV in support of the SC application.

On June 26, 2023, the DOE sent a Notice of Qualification of the Consortium to Enter a Petroleum Service Contract for Nominated Area No. 10 to Philodrill. The JV has since signed the SC and is awaiting the signatures of the Secretary of the DOE and the Philippine President for the awarding of the SC. It will have an area of 1,671 sq. km, which includes the former SC 6A and additional areas relinquished from the adjacent SC 74 in 2022.

Upon award of this new SC, the first sub-phase will focus on further subsurface works in addition to the G&G studies conducted by the former SC 6A JV. These activities aim to establish a final well location and design for the Malajon Prospect and to appraise the Octon Discovery.

Cadlao Block (former SC 6B Bonita)

SC 6B had an area of 567 sq. km and contains the Cadlao Oil Field. The field was discovered in 1977 and produced about 11 MMBO from two subsea production wells from 1981-1991. The remaining recoverable reserves are estimated at 3.7 MMBO for proven reserves (1P) and 5.7 MMBO for proven plus probable reserves (2P) based on a 2012 study by Gaffney, Cline & Associates, Inc. Additionally, near Cadlao lies the East Cadlao Prospect, with estimated recoverable resources of 1.48 MMBO at the P10 level, and 1.17 MMBO at the P50 level.

In December 2021, Nido submitted a farm-in proposal to the JV to increase its participating interest in SC 6B from 9.09% to 72.727% and take over the operatorship of the Service Contract.  A farm-in agreement (“FIA”) was later executed on February 11, 2022, with FEPC’s interest being reduced to 2.4546% from 8.182% in exchange for the said carry in Cadlao’s development costs. Under the FIA, Nido will fund 100% of the drilling of a well, Cadlao-4, the conduct of an extended well test (“EWT”), and the subsequent development of the Cadlao Field.

Nido proposes a two-phase redevelopment consisting of

· Phase 1: A 3 to 9-month EWT using a new single deviated well (Cadlao-4), a mobile offshore production unit (“MOPU”), and either a floating storage and offloading (“FSO”) vessel or a shuttle tanker; and
· Phase 2: Further development of the EWT well and additional wells potentially substituting the MOPU for a small wellhead platform (“WHP”) and storage barge.

In April 2022, RISC completed an independent assessment of the Cadlao Field. Overall, RISC supports the redevelopment as an economic opportunity although costs will have to be carefully controlled.

The Deed of Assignment (“DOA”) of Participating Interest to Nido and the revised 2022 WP&B were submitted to the DOE on April 11, 2022. The WP&B includes the drilling of Cadlao-4 and the conduct of an EWT. However, the spud date of the well will depend on rig and FSO unit availability.  The DOE was approved by the DOE on December 19, 2022.

9

From November 28 to December 1, 2022, Nido conducted a geophysical site survey at Cadlao using the vessel Cassandra VI.  The purpose of the survey was to identify the possible constraints and hazards on the seafloor where the Cadlao-4 well will be located.

On November 15, 2023, Nido and PNOC Exploration Corporation (“PNOC EC”) signed a FIA that provides for PNOC EC’s acquisition of a 20% participating interest in the block, including sharing the cost of drilling and EWT for the Cadlao-4 well. While PNOC EC’s participation was approved by the Consortium, the formal transfer and assignment of the 20% interest from Nido to PNOC EC shall be subject to the approval of DOE.

The tight rig market has caused a delay in the spudding of Cadlao-4, which is now being planned in 2025. Nido has identified the Deep Venture (a drillship) to drill the Cadlao-4 and their Nandino well in SC 54.  However, this will require equipment modification to make it fit for purpose. Currently, the rig is undergoing refurbishment work in Vietnam and is expected to sail to Philippines by early 2025.

On January 5, 2024, the Consortium sent to DOE its letter of intent to apply for a DP PSC before the end of SC 6B’s production term. On January 26, 2024, Nido submitted the application documents for a DP PSC over the former SC 6B block and additional open areas. These documents include a copy of the POD for the Cadlao Field. The new SC will replace SC 6B, which expired on February 28, 2024. The Consortium is now awaiting the government’s final decision on its application.

SC 14A [Nido], SC 14B [Matinloc] & SC 14B-1 [N. Matinloc]

Production in the Nido and Matinloc Fields was terminated permanently on March 13, 2019, after producing 22,173 barrels of oil from January to March 2019. The Nido Field accounted for 93.06% of the total while Matinloc Field contributed 6.94%.  Shell Philippines was the sole buyer of the crude during the period.

Nido started oil production in 1979 while Matinloc was put in place in 1982. The final inception-to-date production figures for the two fields are 18,917,434 barrels for Nido and 12,582,585 barrels for Matinloc.  The North Matinloc Field, which was in production from 1988 to 2017, produced a total of 649,765 barrels of oil.  The total production for the three (3) fields is 32,149,784 barrels.

Seven (7) production wells in Nido (3 out of 5), Matinloc (3), and North Matinloc (1) were successfully P&A from April to May 2019. The P&A of the remaining Nido wells, A1 and A2, were only partially abandoned due to difficulties encountered during operations.

Following the suspension of field operations and the P&A of most of the wells in March 2019, Philodrill conducted the stripping and disposal of equipment and materials aboard the production platforms from June to October 2019.  In December 2019, all production platforms were turned over to the DOE.  On June 26, 2020, the DOE signed a Deed of Donation and Acceptance with the Department of National Defense to formalize the transfer of ownership of the Nido and Matinloc platforms to the Armed Forces of the Philippines, which will now use the platforms for defense purposes.

10

The P&A of the remaining Nido production wells, A-1 and A-2 wells was completed on October 5, 2020. This was initially scheduled in April 2020 but had to be deferred due to COVID-19 related health and travel restrictions.

With the completion of P&A of all production wells, a Notice to Surrender the SC 14A, 14B, 14B-1, Tara, and SC 14D blocks was sent to the DOE on February 16, 2021.  This was approved by the DOE on May 18, 2022.

SC 14C-2 West Linapacan

Block C-2 has an area of 176.5 square kilometers and contains the West Linapacan A and B structures. The Consortium headed by Philodrill continues with its evaluation of the viability of redeveloping the West Linapacan A Field, which was discovered in 1990 and produced around 8.5 MMBO from 1992 before being shut-in in 1996.

In 2018, Philodrill completed the mapping and interpretation work on the 3D seismic data that was reprocessed in 2014. The study focused on the West Linapacan B structure, which was drilled in 1991.  The JV is studying options to develop the field.

In 2019, the SC 14C-2 and SC 74 Consortia conducted joint Rock Physics and QI studies over the West Linapacan and Linapacan areas using existing 3D seismic and well data. The initial phase of the study was carried out and completed by Ikon in October 2019. However, only the SC 74 JV decided to proceed with the second phase of the QI Study.

In September 2021, the JV commenced a technical study on the West Linapacan B Field that focuses on a review of available geologic and well data, digitization of well logs, reservoir modeling, and fracture analysis, to be followed by resource estimation. Phase 1 of the study was completed in November 2021, with preliminary results indicating a stand-alone development for the West Linapacan “B” Field would not be economically viable.

The Phase 2 of the study comprised the formulation of an appraisal/conceptual development and scoping economics involving the West Linapacan A and B Fields. The results indicate a joint development of the fields is feasible provided certain conditions related to recoverable reserves, development costs, production rates, and oil price are met.

On October 20, 2022, Nido Petroleum, a current member of the SC 14C-2 Consortium, submitted a proposal to drill a well and to conduct an EWT on West Linapacan A in exchange for acquiring an additional 62.721% of the Filipino partners’ current participating interest. Under the proposal, Nido will have a post-farm-in interest of 85% while the Filipino partners will retain 15%. On October 28, 2022, the Filipino partners submitted a counter-proposal for sharing the proceeds during production. A draft Farm-in Agreement/Heads of Agreement has been prepared and, as of September 30, 2024, remains under Nido’s consideration.

The block is likewise qualified for the issuance of a new DP PSC with the drilling and development of the West Linapacan A Field as the primary work program.

11

FEL Objectives and Strategy

The core objective of FEL is to maximize the potential of its investments and its current licences to generate income, whilst at the same time continuing to reduce administrative expenses.

FEL plans to achieve this by:

· Development of SC 72

| · | Continued review of exploration blocks to identify potential drilling targets |

| · | Continued review of administrative expenses |

For further details regarding FEL, see its 2023 financial statement package at https://find-and-update.company-information.service.gov.uk/company/05411224/filing-history

Please note that FEL is not required to file its financial statement package with Companies House in the UK until September 30 following the end of its fiscal year which is December 31. Accordingly, the FEL financial statement package for 2024 is not expected to be available until Q3 of 2025.

Risk factors specific to FEL

The Company is exposed to certain risk factors which are specific to its investment in FEL.  These include the following:

· On October 16, 2020, FEL received notice from the DOE that the FM imposed on SC 72 on December 15, 2014 was lifted with immediate effect and that FEL was to resume exploration activities on SC 72. Under the current work program commitments, FEL was given 20 months from the date of lifting of the FM to drill two commitment wells. The total cost of drilling these wells depends on a number of factors. The Company’s management estimates the total work to be between US$70 million and US$100 million. It is important to note that, to date, there has been no announcement of any agreement between FEL and CNOOC in relation to the implementation of the MOU involving SC 72. The risk therefore exists that should FEL not be able to meet its commitments to the DOE, it may have to surrender its rights to SC 72 and pay a penalty equivalent to the minimum financial commitment of the current sub-phase.
On April 6, 2022, FEL as operator under SC 72, received a directive from the DOE to put on hold all exploration activities for SC 72 until such time that the Security, Justice and Peace Coordinating Cluster (“SJPCC”) has issued the necessary clearance to proceed. On April 11, 2022, as a result of not receiving the necessary clearance, Force Majeure was once again declared on SC 72.
In June 2022, media outlets reported that the MOU between China and the Philippines had been terminated although media outlets also reported that discussions would continue on joint exploration of SC 72.
12
On October 11, 2022, the DOE granted FGL the following: (i) the Declaration of Force Majeure for SC 72 from April 6, 2022, until such time as the same is lifted by the DOE, (ii) the inclusion of total expenses incurred as a result of the DOE directive to suspend activities as part of the approved recoverable costs, subject to DOE audit, and (iii) in addition to the period in item (i) above, FGL will be entitled to an extension of the exploration period under SC 72 corresponding to the number of days that the contractors actually spent in preparation for the activities that were suspended by the DOE’s suspension order on April 6, 2022.
On March 20, 2023, the DOE further affirmed that the entire period from when the Force Majeure was lifted to when the same was re-imposed (October 14, 2020 to April 6, 2022) will be credited back to SC 72. Thus, once the Force Majeure is lifted, FGL will have 20 months to drill the two commitment wells, equivalent to the remaining term of Sub-Phase 2 of SC 72 before October 14, 2020.
· FEL’s cash inflows is heavily dependent on the Galoc Field production, which continued to operate beyond the original cessation date of September 24, 2020, following an agreement the operator GPC signed with ROI, the owner of the FPSO Rubicon Intrepid. The viability of continued production depends on the consistent output of the producing wells as well as the price of oil.
· FEL’s operations do not generate sufficient cash to fund new exploration work in Galoc and its other blocks; therefore, in the event FEL issued new capital to fund these costs, the Company’s interest in FEL may be diluted.
· FEL is a closely held private company and there is a limited population of potential buyers for FEC’s relatively small interest in FEL.
· FEL’s interest in its main asset SC 72 could be diluted depending on the agreement reached, if any, with potential farm-in partners in the future.
· Further exploration work has to be completed on SC 72 and SC 40 to confirm the value of the resources within these properties.
On March 10, 2022, the Company announced that it agreed to fund an additional cash call for pre-drilling costs received from FEL in the amount of $198,620. The advance to FEL was via non-interest bearing loans. In order to be able to fund the $198,620, the Company accepted a loan from PXP for the same amount (“PXP Loan”). The PXP loan bears interest of LIBOR plus 3.5% and both interest and principal are repayable on the earlier of a) December 31, 2024, or b) any equity issuance by FEC, or c) any sale of FEL shares by FEC, or d) any third party borrowing by FEC. During the period ended December 31, 2022, PXP advanced an additional $80,000 and $356,500 for the year ended December 31, 2023 to the Company for working capital under the same terms and conditions as the PXP Loan. As at September 30, 2024, the outstanding PXP Loan balance was $826,649 (December 31, 2023 - $678,155), which included accrued interest of $88,443 (December 31, 2023 – 43,235). Total interest expense amounted to $45,208 for the nine months ended September 30, 2024 (September 30, 2023 - $20,954).
13
In October 2023, FEL advised the Company of its intent to complete a $3,000,000 fund raising to repay its loan from PXP and for general working capital purposes. FEC agreed to participate in its pro-rata 6.8% share amounting to $204,000 through additional loans from PXP on the same terms and conditions as previous advances.
On December 21, 2023, $626,820 of advances made to FEL by the Company were converted to shares in FEL at a price of $0.30 per share. The $626,820 conversion into FEL shares represented 6.8% of $9,217,939 of debt settled by FEL.

Selected Annual Financial Information Of The Company

Selected Financial Data

Year Ended<br> <br>12/31/23 Year Ended<br> <br>12/31/22 Year Ended<br> <br>12/31/21

| Revenue | $ | - | | $ | - | | $ | - | |

| Net (loss) income | $ | (191,795 | ) | $ | (193,182 | ) | $ | (168,208 | ) |

| Basic and Diluted Income (Loss) per share | $ | (0.00)/(0.00 | ) | $ | (0.00)/(0.00 | ) | $ | (0.00)/(0.00 | ) |

| Dividends per share | $ | 0.00 | | $ | 0.00 | | $ | 0.00 | |

| Weighted  Avg. Shares O/S (’000) | | 861,082,371 | | | 861,082,371 | | | 861,082,371 | |

| Working Capital (Deficit) | $ | (678,562 | ) | $ | 140,053 | | $ | 108,835 | |

| Long-Term Debt | $ | - | | $ | - | | $ | - | |

| Shareholders’ Equity | $ | 1,783,369 | | $ | 1,975,164 | | $ | 2,168,346 | |

| Total Assets | $ | 2,478,57388 | | $ | 2,279,788 | | $ | 2,181,665 | |

Results of Operations

The accounts show a loss for the nine months ended September 30, 2024 of $158,673, or $0.00 per share, versus a loss of $133,024 for the same period in 2023.

The higher net loss was mainly due to an increase in interest expense on the loan from PXP which was $20,954 for the nine months ended September 30, 2023 compared to $45,208 for the nine months ended September 30, 2024.

Lower listing and filing fees and lower office and miscellaneous expenses offset by an increase in professional fees mainly accounted for the difference. Consulting fees for the nine months ended September 30, 2024, were $64,802 versus $65,148 for the same period in the previous year. The difference was not material. Professional fees were $14,403 for the nine-month period ended September 30, 2024, versus $7,523 for the same period in the previous year. The difference was due to an increase in audit fees. Office and miscellaneous costs were $14,082 for the nine-month period ended September 30, 2024, versus $16,735 for the same period in the previous year.  The difference was due to cost cutting measures.  Listing and filing fees were $18,397 for the nine-month period ended September 30, 2024, versus $22,390 for the same period in the previous year. The difference was due to the initial conversion of our 2022 and 2023 filings to XBRL pursuant to new filing requirements in the previous year. For the nine-month period ended September 30, 2024, foreign exchange loss was $1,253 versus 176 for the same period in the previous year. The exchange rate on September 30, 2023, was 1.3520, while for September 30, 2024, it was 1.3499. The average rate for the nine months ended September 30, 2024, was 1.3604 (September 30, 2023 – 1.3457).

14

Balance Sheet

The Company’s current assets were $45,613 at September 30, 2024, versus $16,642 for the year ended December 31, 2023. The difference is mainly a result of the higher cash balance as of September 30, 2024, and higher prepaid expense balance at September 30, 2024. The Company’s assets reflect the investment in FEL on a fair value basis. The fair value of the investment in FEL is stated at $9,601,766 or $1.17 per share.

The investment in FEL represents an investment in a private company for which there is no active market and for which there are no publicly available quoted market prices. The Company has classified its investment in FEL as Level 2 in the fair value hierarchy.

For purposes of determining fair value of the investment in FEL, the Company considered valuation techniques described in IFRS 13 – Fair Value Measurement. In respect of the investment in FEL, management considered the fair value of $9,601,766 to be indicative of the fair value of the investment in FEL. On May 10, 2024, PXP disclosed that the company was undertaking a share swap with Tidemark Holdings Limited (“Tidemark”) whereby PXP would exchange PXP shares for all FEL shares held by Tidemark at a value of US$1.17 per share (430,243,903 PXP shares at PHP3.62). The fair value of the investment is consistent with the implied value based on the May 10, 2024 share swap between PXP and Tidemark, which is a Level 2 input.

There were no transfers between Level 3 and the other levels in the hierarchy during 2024 or 2023.

Summary of Quarterly Results

Selected Financial Data

(in ‘000, except EPS)

3rd<br> <br>Qtr 24 2nd<br> <br>Qtr 24 1st<br> <br>Qtr 24 4th<br> <br>Qtr 23 3rd<br> <br>Qtr 23 2nd<br> <br>Qtr 23 1st<br> <br>Qtr 23 4th<br> <br>Qtr 22

| (Loss) | | (57 | ) | | (57 | ) | | (45 | ) | | (60 | ) | | (42 | ) | | (41 | ) | | (49 | ) | | (50 | ) |

| Basic and Diluted Loss per share | | 0.00 | | | 0.00 | | | 0.00 | | | 0.00 | | | 0.00 | | | 0.00 | | | 0.00 | | | 0.00 | |

Liquidity

The Company’s working capital deficit at September 30, 2024, was $837,235 versus a working capital deficit of $678,562 at December 31, 2023, and shareholders’ equity was $8,764,531 at September 30, 2024 (December 31, 2023 - $1,783,369).  The change was mainly due to the increase in the valuation of FEL which is an investment in shares of a private company that are measured at fair value through other comprehensive income.  As these shares are not traded in an active market, the valuation of this investment is based on management’s consideration of other observable inputs that are available.  For purposes of determining fair value of the investment in FEL, the Company considered valuation techniques described in IFRS 13 – Fair Value Measurement. In respect of the investment in FEL, management considered the fair value of $9,601,766 to be indicative of the investment’s fair value, since on May 10, 2024, PXP disclosed that the company was undertaking a share swap with Tidemark, whereby PXP would exchange PXP shares for all FEL shares held by Tidemark at a value of US$1.17 per share (430,243,903 PXP shares at PHP3.62). The fair value of the investment is consistent with the implied value based on the May 10, 2024 share swap between PXP and Tidemark, which is a Level 2 input.

15

Management considers that the current economic environment is difficult and the outlook for oil and gas exploration companies presents significant challenges in terms of raising funds through issuance of shares.  Previously, to the extent necessary, the Company disposed of quantities of its shareholdings in FEL to PXP under terms that are consistent with the best interests of all shareholders, in order to finance its operations.  In the past, the Company issued new shares under a rights offering scheme to raise new capital to fund its operations but more recently has relied on loans from PXP.

Management currently believes that it is in the best interest of all shareholders that management explores the issuance of new shares or debt to fund its future operations.

The continuation of the Company is dependent upon its ability to raise funds via dispositions of quantities of its shareholdings in FEL to PXP under terms that are consistent with the best interests of shareholders, or obtain loans from PXP.  Also, the Company may issue new shares to PXP and/or other third parties.

The Company is not required to directly contribute capital to any of the projects in which it has an indirect or direct interest.

Cash used in operating activities for the nine-month period ended September 30, 2024, was $78,209 versus $113,618 for the same period in 2023 mainly as a result of the differences described above.

Cash provided by financing activity was $103,286 for the nine months ended September 30, 2024, versus $110,000 for the same period in the previous year. The amount was from loans from PXP.

On March 10, 2022, the Company announced that it agreed to fund an additional cash call for pre-drilling costs received from FEL in the amount of $198,620.  The advance to FEL was via non-interest bearing loans.  In order to be able to fund the $198,620, the Company accepted a loan from PXP for the same amount (“PXP Loan”).  The PXP Loan bears interest of LIBOR plus 3.5% and both interest and principal are repayable on the earlier of a) December 31, 2024, or b) any equity issuance by FEC, or c) any sale of FEL shares by FEC, or d) any third party borrowing by FEC.  During the year ended December 31, 2022, PXP advanced an additional $80,000 and $356,500 for the year ended December 31, 2023 to the Company for working capital under the same terms and conditions as the PXP Loan.  As at September 30, 2024, the outstanding PXP Loan balance was $826,649 (December 31, 2023 - $678,155), which included accrued interest of $88,443 (December 31, 2023 – 43,235).  Total interest expense amounted to $45,208 for the nine months ended September 30, 2024 (September 30, 2023 - $20,954).

16

In October 2023, FEL advised the Company of its intent to complete a $3,000,000 fund raising to repay its loan from PXP and for general working capital purposes.  FEC agreed to participate in its pro-rata 6.8% share amounting to $204,000 through additional loans from PXP on the same terms and conditions as previous advances.

On December 21, 2023, $626,820 of advances made to FEL by the Company were converted to shares in FEL at a price of $0.30 per share. The $626,820 conversion into FEL shares represented 6.8% of $9,217,939 of debt settled by FEL.

Capital Resources

Since the Company has no revenue, it will need to continue to raise funds through either debt, equity, or the sale of assets in order to continue its operations or participate in other projects.  The Company currently has no plans to sell any more of its FEL shares and will be reliant on debt or equity issuances for future funding requirements.

Since the delisting of FEL from the London Stock Exchange, there is no liquidity via a public market for the FEL shares.  As the Company is wholly reliant on the information disclosed by PXP concerning the business of FEL, the Company may not be able to obtain information necessary to facilitate a wider sales process and may be reliant on significant shareholders of PXP for the disposition of any of its FEL shares. Management has looked at all options including raising funds to operate and participate in future FEL financings by way of debt or equity financings.  Given the current share price of the Company, and given that any external financings may have been extremely dilutive, the Company has been accepting loans from PXP in order to sustain operations and to maintain its 6.8% interest in FEL.

On March 10, 2022, the Company announced that it agreed to fund an additional cash call for pre-drilling costs received from FEL in the amount of $198,620. The advance to FEL was via non-interest bearing loans.  In order to be able to fund the $198,620, the Company accepted a loan from PXP for the same amount (“PXP Loan”).  The PXP Loan bears interest of LIBOR plus 3.5% and both interest and principal are repayable on the earlier of a) December 31, 2024, or b) any equity issuance by FEC, or c) any sale of FEL shares by FEC, or d) any third party borrowing by FEC.  During the year ended December 31, 2022, PXP advanced an additional $80,000 and $356,500 for the year ended December 31, 2023 to the Company for working capital under the same terms and conditions as the PXP Loan.  As at September 30, 2024, the outstanding PXP Loan balance was $826,649 (December 31, 2023 - $678,155), which included accrued interest of $88,443 (December 31, 2023 – 43,235).  Total interest expense amounted to $45,208 for the nine months ended September 30, 2024 (September 30, 2023 - $20,954).

In October 2023, FEL advised the Company of its intent to complete a $3,000,000 fund raising to repay its loan from PXP and for general working capital purposes.  FEC agreed to participate in its pro-rata 6.8% share amounting to $204,000 through additional loans from PXP on the same terms and conditions as previous advances.

17

On December 21, 2023, $626,820 of advances made to FEL by us were converted to shares in FEL at a price of US$0.30 per share.  The $626,820 conversion into FEL shares represented 6.8% of $9,217,939 of debt settled by FEL.

During the nine months ended September 30, 2024, short term loans increased by $148,494 as a result of additional working capital advances and accrued interest under the PXP loan.

Off balance sheet Arrangements

There are no off-balance sheet arrangements in existence as of this date.

Transactions with Related Parties

During the nine months ended September 30, 2024, general and administrative expenses included key management personnel compensation totaling $36,000 (2023: $36,000).

As at September 30, 2024, the outstanding PXP Loan balance was $826,649 (December 31, 2023 - $678,155), which included accrued interest of $88,443 (December 31, 2023 - $43,235).  Total interest expense for the quarter was $45,208.

Critical Accounting Estimates and Judgments

The Company makes estimates and assumptions about the future that affect the reported amounts of assets and liabilities. Estimates and judgments are continually evaluated based on historical experience and other factors, including expectations of future events that are believed to be reasonable under the circumstances. In the future, actual experience may differ from these estimates and assumptions.

The effect of a change in an accounting estimate is recognized prospectively by including it in comprehensive income/loss in the period of the change, if the change affects that period only, or in the period of the change and future periods, if the change affects both.

The determination of the fair value of the Company’s investment in FEL is a significant accounting estimate.

Standards, Amendments and Interpretations Not Yet Effective

The Company has prepared its financial statements in accordance with IFRS as issued by the IASB. IFRS represents standards and interpretations approved by the IASB and are comprised of IFRS, International Accounting Standards (“IAS’s”), and interpretations issued by the IFRS Interpretations Committee (“IFRIC’s”) and the former Standing Interpretations Committee (“SIC’s”). The financial statements have been prepared in accordance with IFRS standards and interpretations effective as of September 30, 2024.

New IFRS standards and interpretations or changes to existing standards with future effective dates are either not applicable or not expected to have a significant impact on the financial statements of the Company.

18

Financial Instruments and Risk Management

The Company is exposed through its operations to the following financial risks:

- Market Risk

| - | Credit Risk |

| - | Liquidity Risk |

In common with all other businesses, the Company is exposed to risks that arise from its use of financial instruments. This note describes the Company’s objectives, policies and processes for managing those risks and the methods used to measure them. Further quantitative information in respect of these risks is presented throughout this management discussion and analysis.

There have been no substantive changes in the Company’s exposure to financial instrument risks, its objectives, polices and processes for managing those risks or the methods used to measure them from previous years unless otherwise stated in the note below.

General Objectives, Policies and Procedures

The Board of Directors has overall responsibility for the determination of the Company’s risk management objectives and policies and, whilst retaining ultimate responsibility for them, it has delegated the authority for designing and operating processes that ensure the effective implementation of the objectives and policies to the Company’s finance function. The Board of Directors receive quarterly reports from the Company’s Chief Financial Officer through which it reviews the effectiveness of the processes put in place and the appropriateness of the objectives and policies it sets.

The overall objective of the Board is to set policies that seek to reduce risk as far as possible without unduly affecting the Company’s competitiveness and flexibility. Further details regarding these policies are set out below.

a) Market Risk
Market risk is the risk that the fair value of future cash flows of a financial instrument will fluctuate because of changes in market prices. Market prices are comprised of foreign currency risk, interest rate risk and equity and commodity price risk.
Foreign currency exchange risk
The Company is exposed to foreign currency fluctuations for general and administrative transactions denominated in Canadian Dollars. The majority of the Company’s cash is kept in U.S. dollars. As at September 30, 2024, the Company had an insignificant amount of cash denominated in Canadian dollars that was subject to exchange rate fluctuations between the Canadian dollar and the U.S. dollar. As at September 30, 2024, the Company held financial liabilities of $28,206 that are denominated in Canadian dollars that would be subject to exchange rate fluctuations between Canadian dollars and U.S. dollars.
19
b) Credit risk
The Company maintains cash deposits in one chartered Canadian bank which, from time to time, exceed the amount of depositors insurance available in each respective account. Management assesses the financial condition of this bank and believes that the possibility of any credit loss is minimal. The maximum exposure of credit risk is the Company’s cash deposit of $32,483 (December 31, 2023: $7,406).
c) Liquidity risk
Liquidity risk is the risk that the Company will not be able to meet its obligations as they fall due. The Company does not generate cash from operations but rather, the Company will, from time to time, issue shares via equity placements, borrow funds from an affiliated company or undertake to sell a portion of its investment in the shares of FEL should it be necessary to raise funds.
At this time, the Company has no new business plans and if it continues to act as a holding company of FEL shares, there is a risk it will receive no return from that investment unless alternate sources of funding are found.
The Company manages liquidity by maintaining cash balances available to meet its anticipated operational needs. Liquidity requirements are managed based on expected cash flow to ensure that there is adequate capital to meet short-term and long-term obligations. The Company has in place a planning and budgeting process to help determine the funds required to support the Company’s normal operating requirements on an ongoing basis and its growth plans. As at September 30, 2024, the Company’s accounts payable and accrued liabilities were $56,199, all of which fall due for payment within twelve months of the date of the statement of financial position. As at September 30, 2024, the Company owed PXP for a loan which bears interest of LIBOR plus 3.5% and both interest and principal are repayable on the earlier of a) December 31, 2024, or b) any equity issuance by FEC, or c) any sale of FEL shares by FEC, or d) any third party borrowing by FEC. During the year ended December 31, 2022, PXP advanced an additional $80,000 and $356,500 for the year ended December 31, 2023 to the Company for working capital under the same terms and conditions as the PXP Loan. As at September 30, 2024, the outstanding PXP Loan balance was $826,649 (December 31, 2023 - $678,155), which included accrued interest of $88,443 (December 31, 2023 – 43,235). Total interest expense amounted to $45,208 for the nine months ended September 30, 2024 (September 30, 2023 - $20,954).
In October 2023, FEL advised the Company of its intent to complete a $3,000,000 fund raising to repay its loan from PXP and for general working capital purposes. FEC agreed to participate in its pro-rata 6.8% share amounting to $204,000 through additional loans from PXP on the same terms and conditions as previous advances.
On December 21, 2023, $626,820 of advances made to FEL by us were converted to shares in FEL at a price of US$0.30 per share. The $626,820 conversion into FEL shares represented 6.8% of $9,217,939 of debt settled by FEL.
20
The carrying values of accounts payable and accrued liabilities and short-term loans approximate their fair values due to the relatively short periods to maturity of the instruments.
d) Dilution risk
As discussed elsewhere in this MD&A, there is a risk of continued dilution of the Company’s interest in FEL should it either need to sell shares of FEL to raise operating funds, or not participate in any future share issuance financings undertaken by FEL. Currently there are no plans to sell any of the Company’s FEL shares to fund operations. There is a risk that shareholders may be diluted should the Company need to raise additional operating funds through debt or equity financings.
On March 10, 2022, the Company announced that it agreed to fund an additional cash call for pre-drilling costs received from FEL in the amount of $198,620. The advance to FEL was via non-interest bearing loans. In order to be able to fund the $198,620, the Company accepted a loan from PXP for the same amount. The PXP Loan bears interest of LIBOR plus 3.5% and both interest and principal are repayable on the earlier of a) December 31, 2024, or b) any equity issuance by FEC, or c) any sale of FEL shares by FEC, or d) any third party borrowing by FEC. During the year ended December 31, 2022, PXP advanced an additional $80,000 and $356,500 for the year ended December 31, 2023 to the Company for working capital under the same terms and conditions as the PXP Loan. As at September 30, 2024, the outstanding PXP Loan balance was $826,649 (December 31, 2023 - $678,155), which included accrued interest of $88,443 (December 31, 2023 – 43,235). Total interest expense amounted to $45,208 for the nine months ended September 30, 2024 (September 30, 2023 - $20,954).
In October 2023, FEL advised the Company of its intent to complete a $3,000,000 fund raising to repay its loan from PXP and for general working capital purposes. FEC agreed to participate in its pro-rata 6.8% share amounting to $204,000 through additional loans from PXP on the same terms and conditions as previous advances.
On December 21, 2023, $626,820 of advances made to FEL by us were converted to shares in FEL at a price of US$0.30 per share. The $626,820 conversion into FEL shares represented 6.8% of $9,217,939 of debt settled by FEL.

Other Risk Factors

As a holding company with an interest in FEL, the Company’s business is indirectly subject to risks inherent in oil and gas exploration and development operations.  In addition, there are risks associated with FEL’s stage of operations and the foreign jurisdiction in which it or FEL may operate or invest.  The Company has identified certain risks pertinent to its investment including: exploration and reserve risks, uncertainty of reserve estimates, ability to exploit successful discoveries, drilling and operating risks, title to properties, costs and availability of materials and services, capital markets and the requirement foradditional capital, market perception, loss of or changes to production sharing, joint venture or related agreements, economic and sovereign risks, possibility of less developed legal systems, corporate and regulatory formalities, environmental regulation, reliance on strategic relationships, market risk, competition, dependence on key personnel, volatility of future oil and gas prices and foreign currency risk.

21

Since the delisting of FEL from the London Stock Exchange, there is no liquidity via a public market for the FEL shares.  As the Company is wholly reliant on the information disclosed by PXP concerning the business of FEL, the Company may not be able to obtain information necessary to facilitate a wider sales process and may be reliant on significant shareholders of PXP for the disposition of any of its FEL shares. Management has looked at all options including raising funds to operate and participate in future FEL financings by way of debt or equity financings.  Given the current share price of the Company, and given that any external financings may been extremely dilutive, the Company continues to receive loans from PXP in order to continue operations and to maintain its 6.8% interest in FEL. There is no guarantee these loans will continue and the Company does not currently have any way to pay these loans back.

On April 6, 2022, FEL as operator under SC 72, received a directive from the DOE to put on hold all exploration activities for SC 72 until such time that the Security, Justice and Peace Coordinating Cluster (“SJPCC”) has issued the necessary clearance to proceed. On April 11, 2022, as a result of not receiving the necessary clearance, Force Majeure was once again declared on SC 72 casting substantial doubt on the future of SC 72 and the Company’s 6.8 percent interest in FEL.

In June 2022, media outlets reported that the MOU between China and the Philippines on joint exploration of the West Philippine Sea had been terminated although also reporting that both sides were going to continue with discussions on joint exploration.

On October 11, 2022, the DOE granted FGL the following: (i) the Declaration of Force Majeure for SC 72 from April 6, 2022, until such time as the same is lifted by the DOE, (ii) the inclusion of total expenses incurred as a result of the DOE directive to suspend activities as part of the approved recoverable costs, subject to DOE audit, and (iii) in addition to the period in item (i) above, FGL will be entitled to an extension of the exploration period under SC 72 corresponding to the number of days that the contractors actually spent in preparation for the activities that were suspended by the DOE’s suspension order on April 6, 2022.

On March 20, 2023, the DOE further affirmed that the entire period from when the Force Majeure was lifted to when it was re-imposed (from October 14, 2020 to April 6, 2022) will be credited back to SC 72.  Thus, once the Force Majeure is lifted, FGL will have 20 months to drill the two commitment wells, equivalent to the remaining term of Sub-Phase 2 of SC 72 before October 14, 2020.

Capital Management

The Company’s objectives when managing capital are to safeguard its ability to continue as a going concern, to provide an adequate return to shareholders.

The capital of the Company consists of the items included in shareholders’ equity and cash net of debt obligations. The Company’s Board of Directors approves management’s annual capital expenditures plans and reviews and approves any material debt borrowing plans proposed by the Company’s management.

22

During the twelve months ended December 31, 2022, in order to fund an additional cash call for pre-drilling costs on SC 72, the Company accepted a loan from PXP which bears interest of LIBOR plus 3.5% and both interest and principal are repayable on the earlier of: a) December 31, 2024, or b) any equity issuance by FEC, or c) any sale of FEL shares by FEC, or d) any third party borrowing by FEC. During the year ended December 31, 2022, PXP advanced an additional $80,000 and $356,500 for the year ended December 31, 2023 to the Company for working capital under the same terms and conditions as the PXP Loan.  As at September 30, 2024, the outstanding PXP Loan balance was $826,649 (December 31, 2023 - $678,155), which included accrued interest of $88,443 (December 31, 2023 – 43,235).  Total interest expense amounted to $45,208 for the nine months ended September 30, 2024 (September 30, 2023 - $20,954).

In October 2023, FEL advised the Company of its intent to complete a $3,000,000 fund raising to repay its loan from PXP and for general working capital purposes.  FEC agreed to participate in its pro-rata 6.8% share amounting to $204,000 through additional loans from PXP on the same terms and conditions as previous advances.

On December 21, 2023, $626,820 of advances made to FEL by us were converted to shares in FEL at a price of US$0.30 per share.  The $626,820 conversion into FEL shares represented 6.8% of $9,217,939 of debt settled by FEL.

As at September 30, 2024, the Company had no externally imposed capital requirements nor was there any changes in the Company’s approach to capital management during the year.

General and administration

The following tables show the detailed breakdown of the components of general and administration expenditures.

Nine Months<br> <br>Ended<br> <br>Sept. 30, 2024 Nine Months Ended<br> <br>Sept. 30, 2023

| Professional fees | $ | 14,403 | $ | 7,523 |

| Bank charges | | 528 | | 98 |

| Listing and filing fees | | 18,397 | | 22,390 |

| Office and miscellaneous | | 14,082 | | 16,735 |

| Consulting | | 64,802 | | 65,148 |

| Foreign exchange | | 1,253 | | 176 |

| | $ | 113,465 | $ | 112,070 |

Three Months Ended Sept. 30, 2024 Three Months Ended Sept 30, 2023

| Professional fees | $ | 3,196 | $ | 616 |

| Bank charges | | 144 | | 242 |

| Listing and filing fees | | 10,334 | | 5,346 |

| Office and miscellaneous | | 4,729 | | 4,862 |

| Consulting | | 21,601 | | 21,730 |

| Foreign exchange | | 713 | | 972 |

| | $ | 40,717 | $ | 33,768 |

23

Other MD&A Requirements

Disclosure of Outstanding Share Data

As At September 30, 2024

(a) Authorized and issued share capital:

Class Par Value Authorized Number Issued and Outstanding as at<br> <br>Sept. 30, 2024 Number Issued and Outstanding as at December 31, 2023

| Common Shares | NPV | Unlimited | | 861,082,371 | | 861,082,371 |

| Preferred Shares (convertible redeemable voting) | NPV | Unlimited | None | | None | |

(b) Summary of Options and Warrants outstanding as at September 30, 2024.

There were no options outstanding as at September 30, 2024.  There were no warrants outstanding as at September 30, 2024.

Additional information on the Company is available at www.sedarplus.ca.

Outlook

The 2022 WP&B for SC72 was approved by the DOE on February 17, 2022. It consisted mainly of drilling of Sampaguita 4 and Sampaguita 5 wells starting 2Q 2022, post well analysis, and general and administrative expenses.

On April 6, 2022, FEL as operator under SC 72, received a directive from the DOE to put on hold all exploration activities for SC 72 until such time that the Security, Justice and Peace Coordinating Cluster (“SJPCC”) has issued the necessary clearance to proceed.  On April 11, 2022, as a result of not receiving the necessary clearance, Force Majeure was once again declared on SC 72.

24

FEL anticipates lower revenues from the Galoc Field due to the Galoc-4 shut-in, and normal decline in production of other wells as Galoc approaches its end of life, which the Operator now estimates to occur beyond the expiry date of SC 14C-1 in December 2025, provided the price of oil stays above $60/bbl.

In June 2022, media outlets reported that the MOU between China and the Philippines on joint exploration of the West Philippine Sea had been terminated although also reporting that both sides were going to continue with discussions on joint exploration.

On October 11, 2022, the DOE granted FGL the following: (i) the Declaration of Force Majeure for SC 72 from April 6, 2022, until such time as the same is lifted by the DOE, (ii) the inclusion of total expenses incurred as a result of the DOE directive to suspend activities as part of the approved recoverable costs, subject to DOE audit, and (iii) in addition to the period in item (i) above, FGL will be entitled to an extension of the exploration period under SC 72 corresponding to the number of days that the contractors actually spent in preparation for the activities that were suspended by the DOE’s suspension order on April 6, 2022.

On March 20, 2023, the DOE further affirmed that the entire period from when the Force Majeure was lifted to when it was re-imposed (from October 14, 2020 to April 6, 2022) will be credited back to SC 72.  Thus, once the Force Majeure is lifted, FGL will have 20 months to drill the two commitment wells, equivalent to the remaining term of Sub-Phase 2 of SC 72 before October 14, 2020.

The Company has limited cash resources and required additional capital to allow it to continue to trade, maintain its 6.8% interest in FEL, or invest in any new projects.

Looking Forward

This discussion contains "forward looking statements" as per Section 21E of the US Securities and Exchange Act of 1934, as amended.  Although the Company believes that the expectations reflected in such forward looking statements are reasonable, it can give no assurance that such expectations will prove to have been correct.  Management is currently reviewing many options and there is no assurance that they will not make decisions other than those now contemplated.  The Company is subject to political risks and operational risks identified in documents filed with the Securities and Exchange Commission, including changing oil prices, unsuccessful drilling results, change of government and political unrest in its main area of operations.

25

fecof_ex3.htm EXHIBIT 3

FORM 52‑109FV2

CERTIFICATION OF INTERIM FILINGS

VENTURE ISSUER BASIC CERTIFICATE

I, Daniel Carlos, President and Chief Executive Officer of FEC Resources Inc., certify the following:

1. Review: I have reviewed the interim financial report and interim MD&A (together, the “interim filings”) of FEC Resources Inc. (the “issuer”) for the interim period ended September 30, 2024.
2. No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.
3. Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.

Date:  November 28, 2024

“Daniel Carlos”

| Daniel Carlos |

| President and Chief Executive Officer |

NOTE TO READER
In contrast to the certificate required for non-venture issuers under National Instrument 52‑109 Certification of Disclosure in Issuers’ Annual and Interim Filings (NI 52‑109), this Venture Issuer Basic Certificate does not include representations relating to the establishment and maintenance of disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as defined in NI 52‑109. In particular, the certifying officers filing this certificate are not making any representations relating to the establishment and maintenance of
i) controls and other procedures designed to provide reasonable assurance that information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and
ii) a process to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP.
The issuer’s certifying officers are responsible for ensuring that processes are in place to provide them with sufficient knowledge to support the representations they are making in this certificate.  Investors should be aware that inherent limitations on the ability of certifying officers of a venture issuer to design and implement on a cost effective basis DC&P and ICFR as defined in NI 52‑109 may result in additional risks to the quality, reliability, transparency and timeliness of interim and annual filings and other reports provided under securities legislation.

fecof_ex4.htm EXHIBIT 4

FORM 52‑109FV2

CERTIFICATION OF INTERIM FILINGS

VENTURE ISSUER BASIC CERTIFICATE

I, Mark Rilles, Chief Financial Officer of FEC Resources Inc., certify the following:

1. Review: I have reviewed the interim financial report and interim MD&A (together, the “interim filings”) of FEC Resources Inc. (the “issuer”) for the interim period ended September 30, 2024.
2. No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.
3. Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.

Date: November 28, 2024

“Mark Rilles”

| Mark Rilles |

| Chief Financial Officer |

NOTE TO READER
The issuer’s certifying officers are responsible for ensuring that processes are in place to provide them with sufficient knowledge to support the representations they are making in this certificate. Investors should be aware that inherent limitations on the ability of certifying officers of a venture issuer to design and implement on a cost effective basis DC&P and ICFR as defined in NI 52‑109 may result in additional risks to the quality, reliability, transparency and timeliness of interim and annual filings and other reports provided under securities legislation.
i) controls and other procedures designed to provide reasonable assurance that information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and
ii) a process to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP.
In contrast to the certificate required for non-venture issuers under National Instrument 52‑109 Certification of Disclosure in Issuers’ Annual and Interim Filings (NI 52‑109), this Venture Issuer Basic Certificate does not include representations relating to the establishment and maintenance of disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as defined in NI 52‑109. In particular, the certifying officers filing this certificate are not making any representations relating to the establishment and maintenance of

fecof_ex5.htm EXHIBIT 5

FEC HEADQUARTERS<br> <br>Vancouver, British Columbia<br> <br>E-mail: info@FECResources.com<br> <br>Website: http://www.FECResources.com

FEC RECEIVES FURTHER EXTENSION FOR LOAN REPAYMENT

Dateline: Vancouver, British Columbia

Ticker: “FECOF”

Date: October 1, 2024

FEC RESOURCES INC. (PINK: FECOF) (“FEC” or the “Company”) received a request for a repayment plan from PXP Energy Corporation (“PXP”) with respect to the $738,206 principal and approximately $88,443 of accrued interest due to PXP by the Company. The loan was due on September 30, 2024.

The Company is pleased to report that it requested and received an extension of the repayment due date from September 30, 2024 to December 31, 2024, with all other terms of the loan remaining the same.

On behalf of the Board of,

FEC Resources Inc.

Daniel Carlos

Director and Chief Executive Officer

For more information please e-mail info@FECResources.com or visit the FEC Resources website at www.fecresources.com.