Pampa Energy Inc 6-K, filed Dec 15, 2022
Pampa Energy Inc. (PAM)
About this 6-K
Pampa Energy Inc filed this 6-K on December 15, 2022.
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
REPORT OF FOREIGN
ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16 UNDER
SECURITIES EXCHANGE ACT OF 1934
For the month of December, 2022
(Commission File No. 001-34429),
PAMPA ENERGIA S.A.
(PAMPA ENERGY INC.)
Argentina
(Jurisdiction of incorporation or organization)
Maipú 1
C1084ABA
City of Buenos Aires
Argentina
(Address of principal executive offices)
(Indicate by check
mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.)
Form 20-F ___X___ Form 40-F ______
(Indicate
by check mark whether the registrant by furnishing the
information contained in this form is also thereby furnishing the
information to the Commission pursuant to Rule 12g3-2(b) under
the Securities Exchange Act of 1934.)
Yes ______ No ___X___
(If "Yes"
is marked, indicate below the file number assigned to the
registrant in connection with Rule 12g3-2(b): 82- .)
This Form 6-K for Pampa Energía S.A. (“Pampa” or the “Company”) contains:
SIGNATURE
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
Date: December 15, 2022
| Pampa Energía S.A. | ||
| By: |
/s/ Gustavo Mariani |
|
|
Name: Gustavo Mariani Title: Chief Executive Officer |
||
FORWARD-LOOKING STATEMENTS
This press release may contain forward-looking statements. These statements are statements that are not historical facts, and are based on management's current view and estimates offuture economic circumstances, industry conditions, company performance and financial results. The words "anticipates", "believes", "estimates", "expects", "plans" and similar expressions, as they relate to the company, are intended to identify forward-looking statements. Statements regarding the declaration or payment of dividends, the implementation of principal operating and financing strategies and capital expenditure plans, the direction of future operations and the factors or trends affecting financial condition, liquidity or results of operations are examples of forward-looking statements. Such statements reflect the current views of management and are subject to a number of risks and uncertainties. There is no guarantee that the expected events, trends or results will a ctually occur. The statements are based on many assumptions and factors, including general economic and market conditions, industry conditions, and operating factors. Any changes in such assumptions or factors could cause actual results to differ materially from current expectations.
Ciudad Autónoma de Buenos Aires, December 15, 2022
COMISIÓN NACIONAL DE VALORES
25 de Mayo 175
Ciudad A. de Buenos Aires
BOLSAS Y MERCADOS ARGENTINOS S.A.
Sarmiento 299
Ciudad A. de Buenos Aires
Ref.: Relevant Event – Rounds 4 and 5 of Plan Gas.Ar
Dear Sirs:
I am writing to Bolsas y Mercados Argentinos and the National Securities Commission (Comisión Nacional de Valores), in my capacity as Responsible for Market Relations of Pampa Energía S.A. (‘Pampa’ and/or the ‘Company’) to inform that, within the scope of the tender of rounds 4 and 5 under the Plan to Promote Argentine Natural Gas Production (‘Plan Gas.Ar’), yesterday, December 14, 2022 the auction of said rounds volumes for all the basins in the country was finally made. Pursuant to the reported prices at the offers opening, Pampa would be awarded a volume of 4.8 MMm3/d for the Neuquen Basin, at US$ 3.485 per million BTU, out of a total of 11 MMm3/d that would be transported through the new Néstor Kirchner pipeline in 2023. Likewise, at the moment of the award, the Company will increase its original offer of 9 MMm3/d from January 2025 to December 2028 at the current price, contributing with 44% of gas for next winter to be transported through the new pipeline replacing the need to import natural gas, GNL and liquid fuels from Bolivia to meet the supply of the power plants. The tender is expected to take place on December 22, 2022.
Sincerely,
María Agustina Montes
Responsible for Market Relations