Borr Drilling Ltd 6-K, filed Nov 9, 2021
Borr Drilling Ltd (BORR)
6-K
2021-11-09
For: 2021-11-09
View Original
Added on
July 04, 2026
About this 6-K
Borr Drilling Ltd filed this 6-K on November 9, 2021.
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16
OF THE SECURITIES EXCHANGE ACT OF 1934
November 9, 2021
Commission File Number 001-39007
Borr Drilling Limited
S. E. Pearman Building
2nd Floor 9 Par-la-Ville Road
Hamilton HM11
Bermuda
(Address of principal executive office)
Form 20-F ☒ Form 40-F ☐
Indicate by check mark if the registrant is submitting the Form 6-K on paper as permitted by Regulation S-T Rule 101(b)(1): ☐
Indicate by check mark if the registrant is submitting the Form 6-K on paper as permitted by Regulation S-T Rule 101(b)(7): ☐
Exhibits
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
|
|
BORR DRILLING LIMITED
|
|
|
Date: November 9, 2021
|
By:
|
/s/ Georgina Sousa
|
|
|
Name:
|
Georgina Sousa
|
|
|
Title:
|
Director
|
Exhibit 99.1
Hamilton, Bermuda, November 5, 2021: Borr Drilling Limited (“Borr”, “Borr Drilling” or the “Company”) announces preliminary unaudited results for the three and nine months ended September 30, 2021.
Highlights third quarter of 2021
• Total operating revenues of $73.0 million, an increase of $18.2 million (33%) compared to the second quarter of 2021
• Net loss of $32.6 million, an improvement of $27.3 million compared to the second quarter of 2021
• Cash and cash equivalents at the end of the third quarter of 2021 was $68.9 million, an increase of $36.5 million from the end of the second quarter of 2021
• Adjusted EBITDA1 of $20.0 million, an increase of $16.3 million (441%) compared to the second quarter of 2021
• Awarded 32 new contracts, extensions, exercised options and LOA/LOIs year-to-date, representing 7,929 days and $668 million of potential backlog including contracts through its Drilling JVs and mobilization compensation
Subsequent events
• Secured new LOAs for the rigs "Idun" and "Groa" and a contract for "Ran" amounting to a total of approximately 3.4 years of backlog and increasing the contracted and committed fleet to 17 rigs
• Converted the previously announced LOA/LOIs for the rigs "Mist", "Gunnlod" and "Gerd" into contracts
CEO, Patrick Schorn commented:
"We are pleased with the performance in the third quarter of 2021, marking a significant milestone in the operational turnaround efforts led by our teams around the world. Our 13 operating rigs provided solid EBITDA and positive cash flows in the quarter. The cash position is further positively impacted by the sale of our integrated well services joint ventures and streamlining our Mexico operations.
Since our last report in August, we have continued adding backlog with currently 17 rigs being contracted or committed which will lead to three additional warm stacked rigs being activated. We see stronger customer demand for our rigs through a higher frequency of commercial discussions and tendering in recent months. Coupled with the increase in recent tenders for multi-year, multi-rig contracts, this leads us to expect utilization levels to improve rapidly.
Our strong operational performance, customer reach and fleet availability uniquely places Borr Drilling in a position to benefit from this strengthening market and we remain on track to fully contract our fleet of 23 delivered rigs by 2022.
Management has continued its engagement with various creditors with the aim to address the 2023 debt maturities.
Currently we are in advanced discussions with one of the significant creditors, having arrived at a commonly understood framework to extend commitments substantially beyond 2023. This is subject to certain conditions, including board approval of each respective company as well as reaching acceptable concessions from other creditor groups.
With a continued increase in the number of active rigs and an upward adjustment of the 2022 E&P capex budgets, we are confident in our ability to further improve our financial performance. This improvement will also provide a foundation ultimately leading to a solution for the 2023 maturities that will benefit all stakeholders."
The full report and primary financial statements are available in the files enclosed to this release.
November 5, 2021
The Board of Directors
Borr Drilling Limited
Hamilton, Bermuda
Questions should be directed to:
Magnus Vaaler: CFO, +44 1224 289208
• Net loss of $32.6 million, an improvement of $27.3 million compared to the second quarter of 2021
• Cash and cash equivalents at the end of the third quarter of 2021 was $68.9 million, an increase of $36.5 million from the end of the second quarter of 2021
• Adjusted EBITDA1 of $20.0 million, an increase of $16.3 million (441%) compared to the second quarter of 2021
• Awarded 32 new contracts, extensions, exercised options and LOA/LOIs year-to-date, representing 7,929 days and $668 million of potential backlog including contracts through its Drilling JVs and mobilization compensation
Subsequent events
• Secured new LOAs for the rigs "Idun" and "Groa" and a contract for "Ran" amounting to a total of approximately 3.4 years of backlog and increasing the contracted and committed fleet to 17 rigs
• Converted the previously announced LOA/LOIs for the rigs "Mist", "Gunnlod" and "Gerd" into contracts
CEO, Patrick Schorn commented:
"We are pleased with the performance in the third quarter of 2021, marking a significant milestone in the operational turnaround efforts led by our teams around the world. Our 13 operating rigs provided solid EBITDA and positive cash flows in the quarter. The cash position is further positively impacted by the sale of our integrated well services joint ventures and streamlining our Mexico operations.
Since our last report in August, we have continued adding backlog with currently 17 rigs being contracted or committed which will lead to three additional warm stacked rigs being activated. We see stronger customer demand for our rigs through a higher frequency of commercial discussions and tendering in recent months. Coupled with the increase in recent tenders for multi-year, multi-rig contracts, this leads us to expect utilization levels to improve rapidly.
Our strong operational performance, customer reach and fleet availability uniquely places Borr Drilling in a position to benefit from this strengthening market and we remain on track to fully contract our fleet of 23 delivered rigs by 2022.
Management has continued its engagement with various creditors with the aim to address the 2023 debt maturities.
Currently we are in advanced discussions with one of the significant creditors, having arrived at a commonly understood framework to extend commitments substantially beyond 2023. This is subject to certain conditions, including board approval of each respective company as well as reaching acceptable concessions from other creditor groups.
With a continued increase in the number of active rigs and an upward adjustment of the 2022 E&P capex budgets, we are confident in our ability to further improve our financial performance. This improvement will also provide a foundation ultimately leading to a solution for the 2023 maturities that will benefit all stakeholders."
The full report and primary financial statements are available in the files enclosed to this release.
November 5, 2021
The Board of Directors
Borr Drilling Limited
Hamilton, Bermuda
Questions should be directed to:
Magnus Vaaler: CFO, +44 1224 289208
Exhibit 99.2

Borr Drilling Limited Announces Preliminary Results for the Third Quarter of 2021
Hamilton, Bermuda, November 5, 2021: Borr Drilling Limited (“Borr”, “Borr Drilling” or the “Company”) announces preliminary unaudited results for the three and nine months ended September 30, 2021.
Highlights third quarter of 2021
|
•
|
Total operating revenues of $73.0 million, an increase of $18.2 million (33%) compared to the second quarter of 2021
|
|
•
|
Net loss of $32.6 million, an improvement of $27.3 million compared to the second quarter of 2021
|
| • |
Cash and cash equivalents at the end of the third quarter of 2021 was $68.9 million, an increase of $36.5 million from the end of the second quarter of 2021
|
|
•
|
Adjusted EBITDA1 of $20.0 million, an increase of $16.3 million (441%) compared to the second quarter of 2021
|
| • |
Awarded 32 new contracts, extensions, exercised options and LOA/LOIs year-to-date, representing 7,929 days and $668 million of potential backlog including contracts through its Drilling JVs and mobilization compensation
|
Subsequent events
|
•
|
Secured new LOAs for the rigs "Idun" and "Groa" and a contract for "Ran" amounting to a total of approximately 3.4 years of backlog and increasing the contracted and committed fleet to 17 rigs
|
|
•
|
Converted the previously announced LOA/LOIs for the rigs "Mist", "Gunnlod" and "Gerd" into contracts
|
CEO, Patrick Schorn commented:
"We are pleased with the performance in the third quarter of 2021, marking a significant milestone in the operational turnaround efforts led by our teams around the world. Our 13 operating rigs provided solid EBITDA
and positive cash flows in the quarter. The cash position is further positively impacted by the sale of our integrated well services joint ventures and streamlining our Mexico operations.
Since our last report in August, we have continued adding backlog with currently 17 rigs being contracted or committed which will lead to three additional warm stacked rigs being activated. We see
stronger customer demand for our rigs through a higher frequency of commercial discussions and tendering in recent months. Coupled with the increase in recent tenders for multi-year, multi-rig contracts, this leads us to expect utilization levels
to improve rapidly. Our strong operational performance, customer reach and fleet availability uniquely places Borr Drilling in a position to benefit from this strengthening market and we remain on track to fully contract our fleet of 23 delivered
rigs by 2022.
Management has continued its engagement with various creditors with the aim to address the 2023 debt maturities. Currently we are in advanced discussions with one of the significant creditors, having arrived at a commonly understood framework to
extend commitments substantially beyond 2023. This is subject to certain conditions, including board approval of each respective company as well as reaching acceptable concessions from other creditor groups.
With a continued increase in the number of active rigs and an upward adjustment of the 2022 E&P capex budgets, we are confident in our ability to further improve our financial performance. This
improvement will also provide a foundation ultimately leading to a solution for the 2023 maturities that will benefit all stakeholders."
1 The Company uses certain financial information calculated on a basis other than in accordance with accounting principles
generally accepted in the United States (US GAAP) including Adjusted EBITDA. Adjusted EBITDA as used above represents our periodic net loss adjusted for: depreciation and impairment of non-current assets, other non-operating income; (income)/loss
from equity method investments, total financial (income) expense net, income tax expense, amortization of deferred mobilization costs and revenue. Adjusted EBITDA is included here by the Company because the Company believes that the measure
provides useful information regarding the Company’s operational performance. For a reconciliation of Adjusted EBITDA to Net loss, please see the last page of this report.
1

Management Discussion and Analysis
The discussion below compares the results of the third quarter of 2021 to the results of the second quarter of 2021.
|
In $ million
|
Q3 - 2021
|
Q2 - 2021
|
Change ($)
|
Change (%)
|
||||||||||||
|
Total operating revenues
|
73.0
|
54.8
|
18.2
|
33
|
%
|
|||||||||||
|
Rig operating and maintenance expenses
|
(45.6
|
)
|
(47.4
|
)
|
1.8
|
(4
|
)%
|
|||||||||
|
General and administrative expenses
|
(7.7
|
)
|
(7.8
|
)
|
0.1
|
(1
|
)%
|
|||||||||
|
Total operating expenses
|
(81.7
|
)
|
(81.6
|
)
|
(0.1
|
)
|
—
|
%
|
||||||||
|
Adjusted EBITDA
|
20.0
|
3.7
|
16.3
|
441
|
%
|
|||||||||||
|
Other non-operating income
|
3.6
|
—
|
3.6
|
100
|
%
|
|||||||||||
|
Income / (loss) from equity method investments
|
3.8
|
(5.7
|
)
|
9.5
|
-
|
|||||||||||
|
Net loss
|
(32.6
|
)
|
(59.9
|
)
|
27.3
|
(46
|
)%
|
|||||||||
|
Cash and cash equivalents
|
68.9
|
32.4
|
36.5
|
113
|
%
|
|||||||||||
|
Total equity
|
935.8
|
968.2
|
(32.4
|
)
|
(3
|
)%
|
Three months ended September 30, 2021 compared to three months ended June 30, 2021
Total operating revenues for the third quarter of 2021 were $73.0 million, an increase of $18.2 million compared to the second quarter of 2021, consisting of $57.6 million in dayrate revenues and $15.4 million in
related party revenues. Dayrate revenues increased by $8.2 million quarter on quarter due to more rig operating days for the rigs "Skald" and "Natt" as a result of continuing contracts which commenced in the prior quarter, as well as a higher
dayrate for "Idun" due to standby time incurred in the second quarter. Related party revenues from the Company's JVs in Mexico increased by $10.0 million quarter on quarter due to an increase in operating days for the rigs "Gersemi" and "Grid". In
addition, contract preparation and mobilisation costs were fully amortized in the Drilling JVs in the second quarter of
2021, also contributing to higher bareboat revenues for the Company during the third quarter of 2021. The increase in related party revenue is primarily bareboat revenue, which does not have a corresponding impact on
the Company's rig operating and maintenance expenses.
Rig operating and maintenance expenses were $45.6 million for the third quarter of 2021, a decrease of $1.8 million compared to $47.4 million for the second quarter of 2021.
General and administrative expenses were $7.7 million for the third quarter of 2021, a decrease of $0.1 million compared to the second quarter of 2021.
Adjusted EBITDA2 for the third quarter 2021 was $20.0 million, an increase of $16.3 million compared to the second quarter of 2021.
Other non-operating income was $3.6 million in the third quarter of 2021 compared with nil in the second quarter of 2021, due to the gain on sale of the Company's 49% interest in each of the Opex and Akal joint
ventures on August 4, 2021.
Income from equity method investments relating to our Mexican JVs was $3.8 million for the third quarter 2021 compared to a loss of $5.7 million in the second quarter 2021, an increase of $9.5 million. The increase
was mainly attributable to an increase in income in the IWS JVs due to higher utilization than in the prior quarter where there was extended idle time between wells.
Liquidity, Corporate Development and Financing
The Company's cash and cash equivalents balance as of September 30, 2021 was $68.9 million, compared to $32.4 million as of June 30, 2021.
Net cash used in operating activities was $7.0 million, which includes cash interest payments of $11.2 million.
2

Net cash from investing activities was $43.5 million, consisting of repayments of our equity method investments (the Mexico JVs) of $38.7 million, and disposal of equity method investments of $10.6 million, offset by additions to jack-up rigs of
$5.8 million that mainly relates to rig activation payments on "Skald". For cash generated by equity method investments, $26.5 million is attributable to the sale of the IWS JVs ownership.
We currently have $1.9 billion of long-term debt, of which approximately $1.0 billion is provided by shipyards where there are no cash interest payments due until March 2023, except for annual payments to each of the
two yards of $6 million in 2021 and $12 million in 2022.
The weighted average interest rate for our interest-bearing debt was 4.7% for the nine months ended September 30, 2021, excluding the convertible bond, which carries 3.875% interest.
Mexican Joint Ventures Operational Results on a 100% basis
The net loss of our Drilling joint ventures was $(2.8) million and adjusted EBITDA in the third quarter of 2021 was $1.8 million. Included in the third quarter of 2021 results for Drilling JVs are $15.4 million of
net costs related to charges from Borr entities, representing bareboat charter fees, staffing and management expenses.
As of September 30, 2021, Borr Drilling had $41.1 million of receivables from its Joint Ventures in Mexico, representing bareboat charter and prepaid expenses, recorded as "Due from related parties" in the
Unaudited Consolidated Balance Sheets. Additionally, as at September 30, 2021, the "Equity method investments" balance in the Unaudited Consolidated Balance Sheets included $16.1 million in funding provided to one of our Drilling JVs.
Borr Drilling has received approximately $65 million in cash payments from the Mexican JVs since the start of the year until September 30, 2021 of which $26.5 million relates to the sale of the IWS JVs. The remaining
receipts are a combination of the payment of receivables and the repayment of funding provided.
Fleet, Operations and Contracts
The current delivered fleet consist of 23 modern jack-up rigs all built after 2010, with an additional five rigs under construction at Keppel FELS.
The Company has recently secured new contracts and LOAs for its active rig "Idun" and warm stacked rigs "Groa" and "Ran", increasing the Company's contracted or committed fleet to 17 units: three in West Africa,
three in the North Sea, one in the Middle East, five in South East Asia and five in Mexico.
"Idun" has been awarded a binding LOA for a program in South East Asia with an expected duration of 421 days plus options. "Groa" has been awarded a binding LOA for a program in the Middle East with a duration of 730
days plus options. And finally, "Ran" has been awarded an accommodation contract for a program in the UK with an expected duration of 100 days plus options, after which the rig is expected to be relocated to Mexico.
Additionally, the Company has converted into contracts the previously announced LOIs and LOAs for "Gerd" with Addax in Cameroon (previously assigned to "Frigg"), "Mist" with PTTEP in Thailand and "Gunnlod" with IPC
in Malaysia.
For more details on our rig contracting, please refer to our Fleet Status report issued at the same date of this report. Year to date 2021, we have been awarded 32 new contracts, extensions, exercised options, LOAs
and LOIs,
representing 7,929 days, or 21.7 years and $668 million of potential backlog, including contracts through our Drilling
JVs on a 100% basis and mobilization compensation. During the same period, our operating rigs have consumed approximately 11.5 years of backlog. Our backlog replenishment ratio YTD stands at a multiple of ~2x,
meaning that we added twice as many days of backlog as days consumed during the same period.
The technical utilization for the fleet was 97.3% in third quarter of 2021. The economic utilization was 85.8% for the third quarter of 2021, negatively impacted by standby time for two rigs in Mexico. Currently, all
of our five rigs in Mexico are operating on full rate. For the first three quarters of 2021, technical utilization was 98.7% and economic utilization was 86.2%.
3
Market
Global competitive jack-up rig utilization stood at 84% at the end of September 2021, an increase of two percentage points quarter-on-quarter and four percentage points since December 31, 2020. The utilization for
the modern jack-up fleet (rigs built after year 2000) has increased by three percentage points from December 31, 2020 to 83% at the end of the third quarter of 2021 and further to 84% as of October 2021.
Marketed availability among rigs built after 2010 has continued to tighten with nine additional rigs contracted year to date. We expect this number to increase significantly in the coming quarters as several ongoing
tenders require or prefer such units. The number of available rigs built after 2010 currently stands at 29, excluding rigs under construction and rigs that have been stacked for over three years.
Tendering activities remain strong with several term programs and multi-rig tenders ongoing across most jack-up basins expected to conclude in the coming quarters. Based on such ongoing tenders and our active
discussions with customers, we maintain our view that over 30 additional rigs could be required in the next 12 to 18 months, particularly driven by NOC work programs. In particular, it is worth noting an increased sense of urgency by the customers
who have been releasing new tenders with short turnaround times or resuming tenders previously put on-hold in order to accelerate awards and secure capacity.
Risks and uncertainties
Borr is exposed to a number of risk factors related to the Company’s financial position, operations and the general industry in which the Company operates. The COVID-19 pandemic and associated effects during 2020 and
2021 have increased the natural risks that we face generally.
Since March 2020, national and local travel restrictions and lockdowns in various regions following the pandemic outbreak caused disruptions to our operations and the pandemic imposed a risk to the health of our
personnel. Our rigs and shore based operations were impacted by reduced personnel, border closures, and many employees were working from home or forced to stay home by local regulations. Further escalations of the current pandemic outbreaks and
other public health crisis or natural disasters could occur in the future and could impact Borr’s operations, including our Joint Ventures in Mexico. In addition, the COVID pandemic impacted the global economy and therefore industry demand for
drilling services and we have previously reported contract loss and suspensions, as well as reduced marketing opportunities while our customers reacted to circumstances. As a result, we remain subject to risks related to the pandemic and we will
continue to monitor our operations and respond to circumstances as they arise.
In addition, while we have improved our liquidity through equity raises in January 2021 and in 2020, and we have extended debt maturities and deferred interest payments, we continue to face liquidity and other risks
as described in our 2020 Annual Report, including risks relating to our significant debt maturities falling due in 2023.
Forward looking statements
This announcement includes forward looking statements. Forward looking statements are, typically, statements that do not reflect historical facts and may be identified by words such as "anticipate", "believe",
"continue", "estimate", "expect", "intends", "may", "should", "will", "likely" and similar expressions and include expectations regarding industry trends and market outlook, including expected trends and activity levels in the jack-up rig and oil
industry, expected utilization levels and tendering activity, demand, statements with respect to fully contracting our fleet, contract backlog, LOIs and LOAs, tendering and contracting activity, market opportunities and contract terms including
estimated duration of contracts and activity of rigs on particular contracts, expected number of rigs required, expected E&P capex, statements about our ability to improve financial performance and our financial obligations and maturities,
statements as to market sentiment including statements made under “Market” above, statements about our liquidity and our debt and discussions with our creditors, risks and uncertainties relating to the COVID-19 pandemic and other non-historical
statements. The forward-looking statements in this announcement are based upon various assumptions, many of which are based, in turn, upon further assumptions, which are, by their nature, uncertain and subject to significant known
and unknown risks, contingencies and other factors which are difficult or impossible to predict and which are beyond our control. Such risks, uncertainties, contingencies and other factors could cause actual events to differ materially from the
expectations expressed or implied by the forward-looking statements included herein. There are important factors that could cause our actual results, level of activity, performance, liquidity or achievements to differ materially from the results,
level of activity, performance or achievements expressed or implied by these forward-looking statements including risks relating to our industry and business and liquidity, the risk of delays in payments to our Mexican JVs and payments from our JVs
to us, the risk that our customers do not comply with their contractual obligations, risks relating to industry conditions and tendering activity, risks relating to contracting, including our ability to convert LOIs and LOAs into contracts, the
risk that options will not be exercised, risks relating to our ability to secure contracts for our rigs and the rates that we will be able to achieve, risks relating to market trends, tender activity and rates, risks relating to the agreements we
have reached with lenders, risks relating to our liquidity, that our available liquidity is not sufficient to meet our liquidity requirements and other risks relating to our available liquidity and requirements, risks relating to cash flows from
operations, the risk that we may be unable to raise necessary funds through issuance of additional debt or equity or sale of assets; risks relating to our loan agreements and other debt instruments including risks relating to our ability to comply
with covenants and obtain any necessary waivers and the risk of cross defaults, risks relating to our ability to meet our debt obligations including debt service obligations and maturities and new-build contract payments in 2023 and our other
obligations and other risks described in our working capital statement included in our most recent audited financial statements, risks relating to future financings including the risk that future financings may not be completed when required and
future equity financings will dilute shareholders and the risk that the foregoing would result in insufficient liquidity to continue our operations or to operate as a going concern and other risks factors set forth under “Risk Factors” in our
filings with the U.S. Securities and Exchange Commission and prospectuses filed with the Norwegian NSA.
4

About Borr Drilling Limited
Borr Drilling Limited is an international drilling contractor incorporated in Bermuda in 2016 and listed on the Oslo Stock Exchange from August 30, 2017 and on the New York Stock Exchange from July 31, 2019 under the
ticker "BORR". The Company owns and operates jack-up rigs of modern and high specification designs and provides services focused on the shallow water segment to the offshore oil and gas industry worldwide. Please visit our website at:
www.borrdrilling.com
November 5, 2021
The Board of Directors
Borr Drilling Limited
Hamilton, Bermuda
Questions should be directed to:
Magnus Vaaler: CFO, +44 1224 289208
5
Borr Drilling Limited
Unaudited Consolidated Statements of Operations
(In $ millions except share and per share data)
|
3 months ended
September 30,
2021
|
3 months ended
September 30,
2020
|
9 months ended
September 30,
2021
|
9 months ended
September 30,
2020
|
|||||||||||||
|
Operating revenues
|
||||||||||||||||
|
Dayrate revenue
|
57.6
|
47.9
|
154.4
|
212.9
|
||||||||||||
|
Related party revenue
|
15.4
|
11.3
|
21.8
|
34.4
|
||||||||||||
|
Total operating revenues
|
73.0
|
59.2
|
176.2
|
247.3
|
||||||||||||
|
Gain on disposal
|
—
|
—
|
0.7
|
13.1
|
||||||||||||
|
Operating expenses
|
||||||||||||||||
|
Rig operating and maintenance expenses
|
(45.6
|
)
|
(63.4
|
)
|
(141.8
|
)
|
(216.5
|
)
|
||||||||
|
Depreciation of non-current assets
|
(28.4
|
)
|
(28.9
|
)
|
(83.2
|
)
|
(88.8
|
)
|
||||||||
|
Impairment of non-current assets
|
—
|
(0.8
|
)
|
—
|
(77.1
|
)
|
||||||||||
|
General and administrative expenses
|
(7.7
|
)
|
(10.7
|
)
|
(27.2
|
)
|
(40.6
|
)
|
||||||||
|
Total operating expenses
|
(81.7
|
)
|
(103.8
|
)
|
(252.2
|
)
|
(423.0
|
)
|
||||||||
|
Operating loss
|
(8.7
|
)
|
(44.6
|
)
|
(75.3
|
)
|
(162.6
|
)
|
||||||||
|
Other non-operating income
|
3.6
|
—
|
3.6
|
—
|
||||||||||||
|
Income from equity method investments
|
3.8
|
8.1
|
14.1
|
16.6
|
||||||||||||
|
Financial income (expenses), net
|
||||||||||||||||
|
Interest income
|
—
|
—
|
—
|
0.2
|
||||||||||||
|
Interest expense, net of amounts capitalized
|
(22.9
|
)
|
(22.8
|
)
|
(68.6
|
)
|
(65.0
|
)
|
||||||||
|
Other financial expenses, net
|
(3.7
|
)
|
0.8
|
(14.7
|
)
|
(34.7
|
)
|
|||||||||
|
Total financial expenses, net
|
(26.6
|
)
|
(22.0
|
)
|
(83.3
|
)
|
(99.5
|
)
|
||||||||
|
Loss before income taxes
|
(27.9
|
)
|
(58.5
|
)
|
(140.9
|
)
|
(245.5
|
)
|
||||||||
|
Income tax credit/(expense)
|
(4.7
|
)
|
(3.4
|
)
|
(6.0
|
)
|
(13.0
|
)
|
||||||||
|
Net loss attributable to shareholders of Borr Drilling Limited
|
(32.6
|
)
|
(61.9
|
)
|
(146.9
|
)
|
(258.5
|
)
|
||||||||
|
Total comprehensive loss attributable to shareholders of Borr Drilling Limited
|
(32.6
|
)
|
(61.9
|
)
|
(146.9
|
)
|
(258.5
|
)
|
||||||||
|
Basic and diluted loss per share
|
(0.12
|
)
|
(0.39
|
)
|
(0.55
|
)
|
(1.98
|
)
|
||||||||
|
Weighted-averages shares outstanding
|
273,623,685
|
156,972,197
|
268,047,056
|
130,526,380
|
||||||||||||
1
Borr Drilling Limited
Unaudited Consolidated Balance Sheets
Unaudited Consolidated Balance Sheets
(In $ millions)
|
September 30, 2021
|
December 31, 2020
|
|||||||
|
ASSETS
|
Unaudited
|
Audited
|
||||||
|
Current assets
|
||||||||
|
Cash and cash equivalents
|
68.9
|
19.2
|
||||||
|
Trade receivables
|
32.1
|
22.9
|
||||||
|
Jack-up drilling rigs held for sale
|
—
|
4.5
|
||||||
|
Prepaid expenses
|
5.7
|
6.4
|
||||||
|
Deferred mobilization and contract preparation costs
|
1.7
|
5.7
|
||||||
|
Accrued revenue
|
15.7
|
20.3
|
||||||
|
Tax retentions receivable
|
1.9
|
10.5
|
||||||
|
Due from related parties
|
41.1
|
34.9
|
||||||
|
Other current assets
|
15.0
|
16.4
|
||||||
|
Total current assets
|
182.1
|
140.8
|
||||||
|
Non-current assets
|
||||||||
|
Property, plant and equipment
|
4.2
|
5.6
|
||||||
|
Jack-up rigs
|
2,758.2
|
2,824.6
|
||||||
|
Newbuildings
|
135.5
|
135.5
|
||||||
|
Equity method investments
|
23.7
|
62.7
|
||||||
|
Other non-current assets
|
4.6
|
1.9
|
||||||
|
Total non-current assets
|
2,926.2
|
3,030.3
|
||||||
|
Total assets
|
3,108.3
|
3,171.1
|
||||||
|
LIABILITIES AND EQUITY
|
||||||||
|
Current liabilities
|
||||||||
|
Trade payables
|
14.7
|
20.4
|
||||||
|
Accrued expenses
|
67.5
|
51.7
|
||||||
|
Other current liabilities
|
16.6
|
23.9
|
||||||
|
Total current liabilities
|
98.8
|
96.0
|
||||||
|
Non-current liabilities
|
||||||||
|
Long-term debt
|
1,912.8
|
1,906.2
|
||||||
|
Other liabilities
|
15.3
|
19.7
|
||||||
|
Long-term accrued interest and other items
|
74.3
|
41.1
|
||||||
|
Onerous contracts
|
71.3
|
71.3
|
||||||
|
Total non-current liabilities
|
2,073.7
|
2,038.3
|
||||||
|
Total liabilities
|
2,172.5
|
2,134.3
|
||||||
|
Shareholders’ Equity
|
||||||||
|
Common shares of par value $0.05 per share: authorized 360,000,000 (2020:238,653,846) shares, issued 274,436,351 (2020: 220,318,704) shares and outstanding 273,623,685 (2020: 218,858,990)
shares
|
13.8
|
11.0
|
||||||
|
Additional paid in capital
|
1,977.8
|
1,947.2
|
||||||
|
Treasury shares
|
(13.7
|
)
|
(26.2
|
)
|
||||
|
Accumulated deficit
|
(1,042.1
|
)
|
(895.2
|
)
|
||||
|
Total equity
|
935.8
|
1,036.8
|
||||||
|
Total liabilities and equity
|
3,108.3
|
3,171.1
|
||||||
2
Borr Drilling Limited
Unaudited Consolidated Statements of Cash Flows
(In $ millions)
|
3 months ended
September 30,
2021
|
3 months ended
September 30,
2020
|
9 months ended
September 30,
2021
|
9 months ended
September 30,
2020
|
|||||||||||||
|
Cash Flows from Operating Activities
|
||||||||||||||||
|
Net loss
|
(32.6
|
)
|
(61.9
|
)
|
(146.9
|
)
|
(258.5
|
)
|
||||||||
|
Adjustments to reconcile net loss to net cash used in operating activities:
|
||||||||||||||||
|
Non-cash compensation expense related to stock options
|
0.2
|
0.2
|
1.1
|
1.0
|
||||||||||||
|
Depreciation of non-current assets
|
28.4
|
28.9
|
83.2
|
88.8
|
||||||||||||
|
Impairment of non-current assets
|
—
|
0.8
|
—
|
77.1
|
||||||||||||
|
Gain on disposal of assets
|
(3.6
|
)
|
—
|
(4.3
|
)
|
(13.1
|
)
|
|||||||||
|
Amortization of deferred finance charges
|
1.5
|
—
|
4.5
|
2.4
|
||||||||||||
|
Effective Interest rate adjustments
|
0.4
|
—
|
2.1
|
2.1
|
||||||||||||
|
Change in fair value of financial instruments
|
—
|
—
|
—
|
27.4
|
||||||||||||
|
Loss/(income) from equity method investments
|
(3.8
|
)
|
(8.1
|
)
|
(14.1
|
)
|
(16.6
|
)
|
||||||||
|
Deferred income tax
|
0.1
|
0.7
|
(0.7
|
)
|
1.3
|
|||||||||||
|
Change in assets and liabilities:
|
||||||||||||||||
|
Amounts due to/from related parties
|
(10.9
|
)
|
—
|
(6.2
|
)
|
(16.4
|
)
|
|||||||||
|
Accrued expenses
|
13.7
|
—
|
14.0
|
11.2
|
||||||||||||
|
Long-term accrued interest
|
1.4
|
—
|
33.2
|
—
|
||||||||||||
|
Other current and non-current assets
|
7.6
|
8.7
|
8.2
|
50.3
|
||||||||||||
|
Other current and non-current liabilities
|
(9.4
|
)
|
24.9
|
(8.7
|
)
|
26.7
|
||||||||||
|
Net cash used in operating activities
|
(7.0
|
)
|
(5.8
|
)
|
(34.6
|
)
|
(16.3
|
)
|
||||||||
|
Cash Flows from Investing Activities
|
||||||||||||||||
|
Proceeds from sale of fixed assets
|
—
|
3.0
|
2.2
|
20.8
|
||||||||||||
|
Purchase of marketable securities
|
—
|
—
|
—
|
(92.5
|
)
|
|||||||||||
|
Investments in equity method investments
|
38.7
|
(7.5
|
)
|
40.2
|
(24.7
|
)
|
||||||||||
|
Disposal of equity method investments
|
10.6
|
—
|
10.6
|
|||||||||||||
|
Proceeds from sale of marketable securities
|
—
|
—
|
—
|
3.0
|
||||||||||||
|
Additions to newbuildings
|
—
|
(0.6
|
)
|
—
|
(4.9
|
)
|
||||||||||
|
Additions to jack-up rigs
|
(5.8
|
)
|
(11.2
|
)
|
(13.5
|
)
|
(35.2
|
)
|
||||||||
|
Net cash from/(used in) investing activities
|
43.5
|
(16.3
|
)
|
39.5
|
(133.5
|
)
|
||||||||||
|
Cash Flows from Financing Activities
|
||||||||||||||||
|
Proceeds from share issuance, net of issuance cost
|
—
|
—
|
44.8
|
28.8
|
||||||||||||
|
Proceeds, net of deferred loan cost, from issuance of long-term debt
|
—
|
—
|
—
|
5.0
|
||||||||||||
|
Net cash provided by financing activities
|
—
|
—
|
44.8
|
33.8
|
||||||||||||
|
Net (decrease) increase in cash, cash equivalents and restricted cash
|
36.5
|
(22.1
|
)
|
49.7
|
(116.0
|
)
|
||||||||||
|
Cash, cash equivalents and restricted cash at the beginning of the period
|
32.4
|
34.6
|
19.2
|
128.5
|
||||||||||||
|
Cash and cash equivalents at the end of period
|
68.9
|
12.5
|
68.9
|
12.5
|
||||||||||||
|
Supplementary disclosure of cash flow information
|
—
|
—
|
||||||||||||||
|
Interest paid, net of capitalized interest
|
(11.2
|
)
|
(4.2
|
)
|
(34.4
|
)
|
(29.6
|
)
|
||||||||
|
Income taxes refunded (paid), net
|
2.0
|
(1.7
|
)
|
2.8
|
(7.7
|
)
|
||||||||||
|
Issuance of long-term debt as non-cash settlement for newbuild delivery installment
|
—
|
—
|
—
|
181.8
|
||||||||||||
3
Borr Drilling Limited
Unaudited Consolidated Statements of Changes in Shareholders’ Equity
(In $ millions except share data)
|
In millions of $
|
Number of
outstanding
shares
|
Common
shares
|
Treasury
shares
|
Additional
paid in
capital
|
Accumulated
Deficit
|
Non-
controlling
interest
|
Total
equity
|
|||||||||||||||||||||
|
Balance as at December 31, 2019
|
110,818,351
|
5.6
|
(26.2
|
)
|
1,891.2
|
(576.7
|
)
|
0.2
|
1,294.1
|
|||||||||||||||||||
|
ASU 2016-13 - Measurement of credit losses
|
—
|
—
|
—
|
—
|
(2.9
|
)
|
—
|
(2.9
|
)
|
|||||||||||||||||||
|
Adjusted balance at January 1, 2020
|
110,818,351
|
5.6
|
(26.2
|
)
|
1,891.2
|
(579.6
|
)
|
0.2
|
1,291.2
|
|||||||||||||||||||
|
Share-based compensation
|
—
|
—
|
—
|
0.6
|
—
|
—
|
0.6
|
|||||||||||||||||||||
|
Total comprehensive loss
|
—
|
—
|
—
|
—
|
(87.0
|
)
|
—
|
(87.0
|
)
|
|||||||||||||||||||
|
Other, net
|
—
|
—
|
—
|
—
|
1.5
|
—
|
1.5
|
|||||||||||||||||||||
|
Balance as at March 31, 2020
|
110,818,351
|
5.6
|
(26.2
|
)
|
1,891.8
|
(665.1
|
)
|
0.2
|
1,206.3
|
|||||||||||||||||||
|
Issue of common shares
|
46,153,846
|
2.3
|
—
|
27.7
|
—
|
—
|
30.0
|
|||||||||||||||||||||
|
Equity issuance costs
|
—
|
—
|
—
|
(1.2
|
)
|
—
|
—
|
(1.2
|
)
|
|||||||||||||||||||
|
Share-based compensation
|
—
|
—
|
—
|
0.2
|
—
|
—
|
0.2
|
|||||||||||||||||||||
|
Total comprehensive loss
|
—
|
—
|
—
|
—
|
(109.6
|
)
|
—
|
(109.6
|
)
|
|||||||||||||||||||
|
Other, net
|
—
|
—
|
—
|
—
|
(1.1
|
)
|
—
|
(1.1
|
)
|
|||||||||||||||||||
|
Consolidated balance at June 30, 2020
|
156,972,197
|
7.9
|
(26.2
|
)
|
1,918.5
|
(775.8
|
)
|
0.2
|
1,124.6
|
|||||||||||||||||||
|
Share-based compensation
|
—
|
—
|
—
|
0.2
|
—
|
—
|
0.2
|
|||||||||||||||||||||
|
Total comprehensive loss
|
—
|
—
|
(61.9
|
)
|
—
|
(61.9
|
)
|
|||||||||||||||||||||
|
Other, net
|
—
|
—
|
1.5
|
—
|
1.5
|
|||||||||||||||||||||||
|
Consolidated balance at September 30, 2020
|
156,972,197
|
7.9
|
(26.2
|
)
|
1,918.7
|
(836.2
|
)
|
0.2
|
1,064.4
|
|||||||||||||||||||
|
In millions of $
|
Number of
outstanding
shares |
Common
shares
|
Treasury
shares
|
Additional
paid in
capital
|
Accumulated
Deficit
|
Non-
controlling
interest
|
Total
equity
|
|||||||||||||||||||||
|
Balance as at December 31, 2020
|
218,858,990
|
11.0
|
(26.2
|
)
|
1,947.2
|
(895.2
|
)
|
—
|
1,036.8
|
|||||||||||||||||||
|
Issue of common shares
|
54,117,647
|
2.8
|
—
|
43.2
|
—
|
—
|
46.0
|
|||||||||||||||||||||
|
Equity issue costs
|
—
|
—
|
—
|
(1.2
|
)
|
—
|
—
|
(1.2
|
)
|
|||||||||||||||||||
|
Share based compensation
|
550,263
|
—
|
10.4
|
(9.7
|
)
|
—
|
—
|
0.7
|
||||||||||||||||||||
|
Total comprehensive loss
|
—
|
—
|
—
|
—
|
(54.4
|
)
|
—
|
(54.4
|
)
|
|||||||||||||||||||
|
Balance as at March 31, 2021
|
273,526,900
|
13.8
|
(15.8
|
)
|
1,979.5
|
(949.6
|
)
|
—
|
1,027.9
|
|||||||||||||||||||
|
Share based compensation
|
—
|
—
|
—
|
0.2
|
—
|
—
|
0.2
|
|||||||||||||||||||||
|
Total comprehensive loss
|
—
|
—
|
—
|
—
|
(59.9
|
)
|
—
|
(59.9
|
)
|
|||||||||||||||||||
|
Balance as at June 30, 2021
|
273,526,900
|
13.8
|
(15.8
|
)
|
1,979.7
|
(1,009.5
|
)
|
—
|
968.2
|
|||||||||||||||||||
|
Share based compensation
|
96,785
|
—
|
2.1
|
(1.9
|
)
|
—
|
—
|
0.2
|
||||||||||||||||||||
|
Total comprehensive loss
|
—
|
—
|
—
|
—
|
(32.6
|
)
|
—
|
(32.6
|
)
|
|||||||||||||||||||
|
Balance as at September 30, 2021
|
273,623,685
|
13.8
|
(13.7
|
)
|
1,977.8
|
(1,042.1
|
)
|
—
|
935.8
|
|||||||||||||||||||
4

NON GAAP MEASURES AND RECONCILIATIONS
Set forth below is a reconciliation of Net Loss to Earnings Before Interest, Tax and Depreciation (“Adjusted EBITDA”)
|
(in US$ millions)
|
Q3 - 2021
|
Q2 2021
|
||||||
|
Net loss
|
(32.6
|
)
|
(59.9
|
)
|
||||
|
Depreciation of non-current assets
|
28.4
|
26.4
|
||||||
|
Loss/(Income) from equity method investments
|
(3.8
|
)
|
5.7
|
|||||
|
Financial expense
|
26.6
|
29.2
|
||||||
|
Income tax expense
|
4.7
|
(1.0
|
)
|
|||||
|
Amortization of mobilization costs
|
1.7
|
4.0
|
||||||
|
Amortization of mobilization revenue
|
(1.4
|
)
|
(0.7
|
)
|
||||
|
Gain on sale of investments in joint ventures
|
(3.6
|
)
|
0.0
|
|||||
|
Adjusted EBITDA
|
20.0
|
3.7
|
5
Exhibit 99.3

|
Borr Drilling
Fleet Status Report - 05th November 2021
|
||||||
|
New Contracts / Extensions / Amendments
|
||||||
|
Gerd
|
||||||
|
• Signed Contract (from LOI previously assigned to Frigg): January 2022 to March 2023, Addax, Cameroon
|
||||||
|
Gunnlod
|
||||||
|
• Signed Contract (from LOA): November 2021 to March 2022, IPC, Malaysia
|
||||||
|
Mist
|
||||||
|
• Signed Contract (from LOA): November 2021 to June 2022, PTTEP, Thailand
|
||||||
|
Ran
|
||||||
|
• Signed Contract: February 2022 to June 2022, Undisclosed Operator, UK (acommodation work)
|
||||||
|
Letters of Award / Letters of Intent / Negotiations
|
||||||
|
Groa
|
||||||
|
• LOA: Q1 2022 to Q1 2024, Undisclosed, Middle East
|
||||||
|
Idun
|
||||||
|
• LOA: March 2022 to May 2023, Undisclosed, Southeast Asia
|
||||||
|
Other Developments
|
||||||
|
Saga
|
||||||
|
• Concluded operations with PTTEP Malaysia in September 2021 and commenced its subsequent contract with Hess Malaysia
|
||||||
|
Natt
|
||||||
|
• Concluded operations with Oriental Nigeria in October 2021 and is currently under preparation for its subsequent contract
|
||||||
|
Norve
|
||||||
|
• Concluded operations with BWE Gabon in September 2021 and is currently under preparation for its subsequent contract
|
||||||
|
Prospector 5
|
||||||
|
• Optional periods under current contract have lapsed and the rig is now expected to conclude operations in January 2022
|
||||||
|
This summary is provided as a courtesy and is not intended to replace a detailed review of the Fleet Status Report. This summary contains informaThis summary is
provided as a courtesy and is not intended to replace a detailed review of the Fleet Status Report. This summary contains information on letters of intent/award and advanced negotiations. Letters of intent/award or advanced negotiations
may not result in an actual drilling contract.tion on letters of intent/award and advanced negotiations. Letters of intent/award or advanced negotiations may not result in an actual drilling contract.
|
||||||

|
Borr Drilling
Fleet Status Report - 05th November 2021
|
||||||||||||||||
|
Rig Name
|
Rig Design
|
Rig Water Depth (ft)
|
Year Built
|
Customer / Status
|
Contract Start
|
Contract End
|
Location
|
Comments
|
||||||||
|
Contracted Rigs
|
||||||||||||||||
|
Gunnlod
|
PPL Pacific Class 400
|
400 ft
|
2018
|
PTTEP
|
September - 2020
|
November - 2021
|
Malaysia
|
Operating
|
||||||||
|
IPC
|
November - 2021
|
March - 2022
|
Malaysia
|
Committed
|
||||||||||||
|
Idun
|
KFELS Super B Bigfoot Class
|
350ft
|
2013
|
Petronas
|
June - 2021
|
January - 2022
|
Malaysia
|
Operating
|
||||||||
|
Undisclosed
|
March - 2022
|
May - 2023
|
Southeast Asia
|
LOA
|
||||||||||||
|
Mist
|
KFELS Super B Bigfoot Class
|
350 ft
|
2013
|
Available
|
September 2021
|
November - 2021
|
Thailand
|
Contract Preparations
|
||||||||
|
PTTEP
|
November - 2021
|
June - 2022
|
Thailand
|
Committed with options to extend
|
||||||||||||
|
Saga
|
KFELS Super B Bigfoot Class
|
400 ft
|
2018
|
Hess
|
September - 2021
|
August - 2022
|
Malaysia
|
Operating
|
||||||||
|
Skald
|
KFELS Super B Bigfoot Class
|
400 ft
|
2018
|
PTTEP
|
June - 2021
|
June - 2024
|
Thailand
|
Operating with option to extend
|
||||||||
|
Gerd
|
PPL Pacific Class 400
|
400 ft
|
2018
|
Available
|
January - 2022
|
Cameroon
|
Contract Preparations
|
|||||||||
|
Addax
|
January - 2022
|
March - 2023
|
Cameroon
|
Committed with option to extend
|
||||||||||||
|
Natt
|
PPL Pacific Class 400
|
400 ft
|
2018
|
Available
|
October - 2021
|
November - 2021
|
Cameroon
|
Contract Preparations
|
||||||||
|
Undisclosed
|
November - 2021
|
October - 2022
|
West Africa
|
LOA
|
||||||||||||
|
Norve
|
PPL Pacific Class 400
|
400 ft
|
2011
|
Available
|
September - 2021
|
December - 2021
|
Gabon
|
Contract Preparations
|
||||||||
|
Vaalco
|
December - 2021
|
April - 2022
|
Gabon
|
Committed with option to extend
|
||||||||||||
|
Groa
|
PPL Pacific Class 400
|
400 ft
|
2018
|
Available
|
Q1 2022
|
Cameroon
|
Contract Preparations
|
|||||||||
|
Undisclosed
|
Q1 2022
|
Q1 2024
|
Middle East
|
LOA
|
||||||||||||
|
Prospector 1 1
|
F&G, JU2000E
|
400 ft
|
2013
|
Kistos
|
July - 2021
|
November - 2021
|
Netherlands
|
Operating
|
||||||||
|
Neptune
|
December - 2021
|
March - 2022
|
Netherlands
|
Committed with option to extend
|
||||||||||||
|
Prospector 5 1
|
F&G, JU2000E
|
400 ft
|
2014
|
CNOOC
|
November - 2020
|
January - 2022
|
United Kingdom
|
Operating
|
||||||||
|
Ran 1
|
KFELS Super A
|
400 ft
|
2013
|
Available
|
February - 2022
|
United Kingdom
|
Contract Preparations
|
|||||||||
|
Undisclosed
|
February - 2022
|
June - 2022
|
United Kingdom
|
Committed
|
||||||||||||
|
Galar
|
PPL Pacific Class 400
|
400 ft
|
2017
|
PEMEX
|
April - 2020
|
December - 2022
|
Mexico
|
Operating
|
||||||||
|
Gersemi
|
PPL Pacific Class 400
|
400 ft
|
2018
|
PEMEX
|
August - 2019
|
December - 2022
|
Mexico
|
Operating
|
||||||||
|
Grid
|
PPL Pacific Class 400
|
400 ft
|
2018
|
PEMEX
|
August - 2019
|
December - 2022
|
Mexico
|
Operating
|
||||||||
|
Njord
|
PPL Pacific Class 400
|
400 ft
|
2019
|
PEMEX
|
June - 2020
|
December - 2022
|
Mexico
|
Operating
|
||||||||
|
Odin
|
KFELS Super B Bigfoot Class
|
350 ft
|
2013
|
PEMEX
|
March - 2020
|
December - 2022
|
Mexico
|
Operating
|
||||||||
|
Available Rigs
|
||||||||||||||||
|
Frigg 1
|
KFELS Super A
|
400 ft
|
2013
|
Available
|
Cameroon
|
Warm Stacked
|
||||||||||
|
Gyme
|
PPL Pacific Class 400
|
400 ft
|
2018
|
Available
|
Singapore
|
Warm Stacked
|
||||||||||
|
Hermod
|
KFELS B Class
|
400 ft
|
2019
|
Available
|
Singapore
|
Warm Stacked
|
||||||||||
|
Heimdal
|
KFELS B Class
|
400 ft
|
2020
|
Available
|
Singapore
|
Warm Stacked
|
||||||||||
|
Hild
|
KFELS Super B Class
|
400 ft
|
2020
|
Available
|
Singapore
|
Warm Stacked
|
||||||||||
|
Thor
|
KFELS Super B Bigfoot Class
|
400 ft
|
2019
|
Available
|
Singapore
|
Warm Stacked
|
||||||||||
|
Under Construction Rigs
|
||||||||||||||||
|
Tivar
|
KFELS Super B Bigfoot Class
|
400 ft
|
Under Construction
|
KFELS shipyard, Singapore
|
Rig Delivery in May - 2023
|
|||||||||||
|
Vale
|
KFELS Super B Bigfoot Class
|
400 ft
|
Under Construction
|
KFELS shipyard, Singapore
|
Rig Delivery in July - 2023
|
|||||||||||
|
Var
|
KFELS Super B Bigfoot Class
|
400 ft
|
Under Construction
|
KFELS shipyard, Singapore
|
Rig Delivery in September - 2023
|
|||||||||||
|
Huldra
|
KFELS Bigfoot B Class
|
400 ft
|
Under Construction
|
KFELS shipyard, Singapore
|
Rig Delivery in October - 2023
|
|||||||||||
|
Heidrun
|
KFELS Bigfoot B Class
|
400 ft
|
Under Construction
|
KFELS shipyard, Singapore
|
Rig Delivery in December - 2023
|
|||||||||||
|
1 - HD/HE Capability.
|
||||||||||||||||
|
Operating / Committed
|
Available
|
Cold Stacked
|
Under Construction
|
|||||||||||||
|
|
Total Fleet
|
28
|
17
|
6
|
0
|
5
|
||||||||||
|
Borr Drilling
Fleet Status Report - 05th November 2021
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Rig Name
|
Location
|
2021
|
2022
|
2023
|
2024
|
|||||||||||||||||||||||||||||||||||||||||||||||
|
Q1
|
Q2
|
Q3
|
Q4
|
Q1
|
Q2
|
Q3
|
Q4
|
Q1
|
Q2
|
Q3
|
Q4
|
Q1
|
Q2
|
Q3
|
Q4
|
|||||||||||||||||||||||||||||||||||||
|
Premium Jack-Ups
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Gunnlod
|
Malaysia
|
PTTEP
|
IPC
|
|||||||||||||||||||||||||||||||||||||||||||||||||
|
Idun
|
Malaysia
|
Vestigo
|
Petronas
|
LOA
|
Option
|
|||||||||||||||||||||||||||||||||||||||||||||||
|
Mist
|
Thailand
|
ROC Oil
|
Warm Stacked
|
PTTEP
|
Option
|
|||||||||||||||||||||||||||||||||||||||||||||||
|
Saga
|
Malaysia
|
JX Nippon
|
PTTEP
|
Hess
|
||||||||||||||||||||||||||||||||||||||||||||||||
|
Skald
|
Thailand
|
PTTEP
|
Option
|
|||||||||||||||||||||||||||||||||||||||||||||||||
|
Gerd
|
Cameroon
|
Warm Stacked
|
ADDAX
|
Option
|
||||||||||||||||||||||||||||||||||||||||||||||||
|
Natt
|
Cameroon / West Africa
|
First E&P
|
Oriental
|
LOA
|
LOA Option
|
|||||||||||||||||||||||||||||||||||||||||||||||
|
Norve
|
Gabon
|
BWE
|
Vaalco
|
Option
|
||||||||||||||||||||||||||||||||||||||||||||||||
|
Groa
|
Cameroon / Middle East
|
Warm Stacked
|
LOA
|
LOA Option
|
||||||||||||||||||||||||||||||||||||||||||||||||
|
Prospector 1 1
|
Netherlands
|
One-Dyas
|
Neptune
|
Kistos
|
Neptune
|
Option
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Prospector 5 1
|
United Kingdom
|
CNOOC
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
Ran 1
|
United Kingdom / Mexico
|
Warm Stacked
|
Undisclosed
|
Mexico
|
||||||||||||||||||||||||||||||||||||||||||||||||
|
Galar
|
Mexico
|
PEMEX
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
Gersemi
|
Mexico
|
PEMEX
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
Grid
|
Mexico
|
PEMEX
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
Njord
|
Mexico
|
PEMEX
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
Odin
|
Mexico
|
PEMEX
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
Frigg 1
|
Cameroon
|
Warm Stacked
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
Gyme
|
Singapore
|
Warm Stacked
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
Heimdal
|
Singapore
|
Warm Stacked
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
Hermod
|
Singapore
|
Warm Stacked
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
Hild
|
Singapore
|
Warm Stacked
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
Thor
|
Singapore
|
Warm Stacked
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
Jack-Ups Under Construction
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Tivar
|
KFELS shipyard, Singapore
|
Rig Delivery in May - 2023
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
Vale
|
KFELS shipyard, Singapore
|
Rig Delivery in July - 2023
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
Var
|
KFELS shipyard, Singapore
|
Rig Delivery in September - 2023
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
Huldra
|
KFELS shipyard, Singapore
|
Rig Delivery in October - 2023
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
Heidrun
|
KFELS shipyard, Singapore
|
Rig Delivery in December - 2023
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
Firm |
Option |
Available |
Under Construction |
|||||||||||||||||||||||||||||||||||||||||||||||||
|
1 - HD/HE Capability
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Borr Drilling
Fleet Status Report - 05th November 2021
|
|||||||
|
Additional information regarding this Fleet Status Report
|
|||||||
| This summary contains information on letters of intent/award and advanced negotiations. Letters of intent/award or advanced negotiations may not result in an actual drilling contract. | |||||||
| Forward Looking Statements: The statements described in this status report that are not historical facts are "Forward Looking Statements". Forward Looking Statements reflect management’s current expectations and assumptions, and are subject to inherent uncertainties, risks and changes in circumstances that are difficult to predict. No assurance can be given that the expectations expressed in these Forward-Looking Statements will prove to be correct. Actual results could differ materially from expectations expressed in, or implied by, the Forward-Looking Statements if one or more of the underlying assumptions or expectations proves to be inaccurate or is unrealised. These include, but are not limited to, changes to commencement dates, contract duration, earned day rates, locations and other contractual terms; risks relating to the delivery of drilling rigs under construction; sale and purchase of drilling units; oil and gas prices; and risks associated with international operations generally. No Forward-Looking Statement contained in herein or expressed elsewhere should be relied upon as predicting future events. We undertake no obligation to update or revise any Forward-Looking Statements to reflect events or circumstances that occur, or which we become aware of, after the date hereof, except as otherwise may be required by law. |
|||||||