Fortuna Mining Corp 6-K, filed Apr 12, 2021
Fortuna Mining Corp. (FSM)
About this 6-K
Fortuna Mining Corp filed this 6-K on April 12, 2021.
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
Form 6-K
REPORT OF FOREIGN PRIVATE ISSUER PURSUANTTO RULE 13a-16 OR 15d-16 UNDER THE SECURITIES EXCHANGE ACT OF 1934
For the month of April 2021
Commission File Number 001-35297
Fortuna Silver Mines Inc.
(Translation of registrant’s name into English)
200 Burrard Street, Suite 650, Vancouver, British Columbia, Canada V6C 3L6
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
FORM 20-F ¨ FORM 40-F þ
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): ¨
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): ¨
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
| Fortuna Silver Mines Inc. | ||
|---|---|---|
| (Registrant) | ||
| Date: April 12, 2021 | By: | s/ "Jorge Ganoza Durant" |
| Jorge Ganoza Durant | ||
| President and CEO |
Exhibits:
99.1 Newsrelease dated April 12, 2021
Exhibit 99.1
| NYSE: FSM | TSX: FVI www.fortunasilver.com | NEWS RELEASE |
|---|
Fortuna reports production of1.9 million ounces of silver and 34,555 ounces of gold for the first quarter of 2021
Vancouver, April 12, 2021 – Fortuna SilverMines Inc. (NYSE: FSM) (TSX: FVI) reports production results for the first quarter from its three operating mines in Latin America, the San Jose Mine in Mexico, the Caylloma Mine in Peru, and the Lindero Mine in Argentina. The Company produced 1,913,755 ounces of silver and 34,555 ounces of gold or 59,736 gold equivalent^1^ ounces. Fortuna is on schedule to produce between 6.8 to 7.6 million ounces of silver and between 178 to 202 thousand ounces of gold or between 267,000 to 302,000 ounces gold equivalent^1^ in 2021, in accordance with our annual production guidance (refer to Fortuna news release dated January 19, 2021).
First Quarter ConsolidatedProduction Highlights
| • | Silver production of 1,913,755 ounces; 5 percent increase over<br>Q1 2020 |
|---|---|
| • | Gold production of 34,555 ounces; 242 percent increase over<br>Q1 2020 |
| --- | --- |
| • | Lead production of 8,181,355 pounds; 6 percent increase over<br>Q1 2020 |
| --- | --- |
| • | Zinc production of 11,968,896 pounds; 1 percent increase over<br>Q1 2020 |
| --- | --- |
First Quarter Consolidated OperatingHighlights
| First Quarter 2021 | First Quarter 2020 | |||||||
|---|---|---|---|---|---|---|---|---|
| Caylloma, Peru | San Jose, Mexico | Lindero, Argentina | Consolidated | Caylloma, Peru | San Jose, Mexico | Lindero, Argentina | Consolidated | |
| OPERATIONAL FIGURES | ||||||||
| Tonnes milled | 131,887 | 259,803 | 132,741 | 246,826 | ||||
| Average tpd milled | 1,499 | 3,048 | 1,491 | 2,837 | ||||
| Ore placed on pad^2^ (t) | 2,130,000 | |||||||
| SILVER^3^ | ||||||||
| Grade (g/t) | 77 | 217 | 70 | 216 | ||||
| Recovery (%) | 81.45 | 90.79 | 83.53 | 91.66 | ||||
| Production (oz) | 267,311 | 1,646,444 | 1,913,755 | 249,111 | 1,570,201 | 1,819,312 | ||
| GOLD | ||||||||
| Grade (g/t) | 0.62 | 1.36 | 0.82 | 0.24 | 1.33 | |||
| Gold placed on pad^2^ (oz) | 56,330 | |||||||
| Recovery (%) | 73.09 | 90.51 | 46.39 | 91.34 | ||||
| Production^4^ (oz) | 1,922 | 10,301 | 22,332 | 34,555 | 471 | 9,630 | 10,101 | |
| LEAD | ||||||||
| Grade (%) | 3.21 | 2.96 | ||||||
| Recovery (%) | 87.69 | 89.28 | ||||||
| Production (lbs) | 8,181,355 | 8,181,355 | 7,722,793 | 7,722,793 | ||||
| ZINC | ||||||||
| Grade (%) | 4.70 | 4.58 | ||||||
| Recovery (%) | 87.63 | 88.22 | ||||||
| Production (lbs) | 11,968,896 | 11,968,896 | 11,821,186 | 11,821,186 |
Notes:
| 1. | Gold equivalent production does not include lead or zinc, and is calculated using gold to silver ratio<br>of 1 to 76 |
|---|---|
| 2. | Lindero tonnes and gold grade are estimated using grade control sampling of blast holes. Numbers are reported<br>to the nearest ten thousand for tonnes |
| --- | --- |
| 3. | Metallurgical recovery for silver at the Caylloma Mine is calculated based on silver content in lead concentrate |
| --- | --- |
| 4. | Lindero production includes gold in carbon columns and electrolytic cement |
| --- | --- |
| 5. | Totals may not add due to rounding |
| --- | --- |
| - 2 - |
| --- |
San Jose Mine, Mexico
The San Jose Mine produced 1,646,444 ounces of silver and 10,301 ounces of gold in the first quarter of 2021, in line with budget. Average head grades for silver and gold were 217 g/t and 1.36 g/t, 10 and 11 percent above budget for the quarter, respectively, due to better grades encountered in planned production stopes of the mine with respect to the reserve model.
Caylloma Mine, Peru
In the first quarter of 2021, the Caylloma Mine produced 267,311 ounces of silver with an average head grade of 77 g/t, 4 and 6 percent above budget, respectively.
Caylloma continued to contribute significant gold production in the first quarter of 2021. Gold production was 1,922 ounces, an increase of 308 percent with respect to the comparable period of 2020. The increase in gold production is related to higher head grades encountered in the Animas NE vein. The exploration team continues to carry out work to better understand the continuity of these higher-grade zones.
Lead and zinc production for the first quarter of 2021 was 8,181,355 pounds and 11,968,896 pounds, 9 percent above and in line with budget, respectively. The average head grades for lead and zinc were 3.21% and 4.70%, 13 and 11 percent above budget, respectively.
Lindero Mine, Argentina
Lindero remains on track to achieve 2021 annual gold production guidance of 140,000 to 160,000 ounces (refer to Fortuna news release dated January 19, 2021).
Government mandated international travel restrictions due to COVID-19 is limiting onsite access to foreign vendor support. This continues to affect Lindero’s ramp up progress in specific areas such as the stacking system and the SART plant. The operation is resolving these challenges via the use of remote assistance technology and other initiatives.
In the first quarter of 2021, a total of 2.13 million tonnes of ore were placed on the heap leach pad averaging 0.82 g/t gold, containing an estimated 56,330 ounces of gold. The operation placed 65 percent more ounces on the heap leach pad and produced 53 percent more ounces in doré compared to the fourth quarter of 2020. Total gold production was 22,332 ounces comprised of 20,562 ounces in doré and 1,770 ounces of gold-in-carbon (GIC) inventory.
| First Quarter 2021 | |
|---|---|
| Ore mined^1^ (t) | 1,610,000 |
| Waste mined^1^ (t) | 1,220,000 |
| Total mined^1^ (t) | 2,830,000 |
| Strip ratio (waste to ore) | 0.76 |
| Average crushing throughput (tpd) | 860 |
| Ore placed on leach pad^1^ (t) | 2,130,000 |
| Ore placed grade^1^ (g/t) | 0.82 |
| GIC inventory (oz) | 1,770 |
| Doré poured (oz) | 20,562 |
| Gold produced (oz) | 22,332 |
| Gold sold (oz) | 21,297 |
Note:
| 1. | Lindero tonnes and gold grade are estimated using grade control sampling of blast holes. Numbers are reported<br>to the nearest ten thousand for tonnes |
|---|
| - 3 - |
| --- |
Mining
A total of 1.6 million tonnes of ore were mined in the first quarter of 2021 at a strip ratio of 0.76:1. Mining of ore was in line with expectation, while waste rock movement was 47 percent lower than planned due to the prioritization of mining trucks to stack ore on the leach pad. Waste movement is scheduled to increase during the second half of the year to align the operation with the waste stripping plan for 2021. Reconciliation of the reserve model estimate indicates a good correlation with tonnes, grade, and gold ounces mined within 5 percent of predicted.
Processing
The ramp up of the primary and secondary crushing circuits is progressing according to plan with crushing in March averaging 15,770 tonnes per day and throughput averaging 960 tonnes per hour, representing 84 and 92 percent of design capacity, respectively. During March, crushing peaked at 20,000 tonnes per day.
The tertiary-HPGR crusher, agglomeration plant, and stacking system throughput averaged 7,600 tonnes per day in March, achieving 41 percent of design capacity. During the quarter, the limiting factor for higher throughput was the stacking system, where the operation encountered challenges with automation, mechanical, and operational issues. As at the end of March, the automation and mechanical issues were largely resolved while training of the workforce continues. In the first days of April, the stacking system peaked at 14,780 tonnes per day, 79 percent of design capacity.
In order to remain on track to achieve annual gold production guidance, the operation continues to place coarse ore from the secondary crusher’s stockpile via trucks and run of mine material representing 81 percent of ore placed on the heap leach pad in the quarter.
Recovery of gold for the different granulometries of ore placed on the heap leach pad is in line with expectations with 22,332 ounces of gold produced in the quarter.
The ADR plant is operating as per design capacity. The SART plant ramp up was suspended at the end of February to address operational issues with the copper and gypsum filters. Bypassing the SART plant is not expected to have a critical impact on gold production during the upcoming months due to the relative low levels of soluble copper in the pregnant solution. The operation expects to incorporate the SART plant into the process in the second quarter of 2021.
Quality Assurance & Quality Control
Grade control estimates are based on blast hole chip samples submitted to Lindero’s on-site laboratory for preparation and assaying for gold, using fire assay with an atomic absorption finish. The QA - QC program includes the blind insertion of certified reference standards and assay blanks at a frequency of approximately 1 per 20 normal samples as well as the submission of duplicate samples for verification of sampling and assay precision levels by an ISO 9001:2000 certified umpire laboratory. ALS Global Laboratory in Mendoza, Argentina prepared the samples for assaying and then forwarded the samples to ALS Global Laboratory in Lima, Peru for assay by standard fire assay methods.
| - 4 - |
| --- |
Qualified Person
Amri Sinuhaji is the Technical Services Director – Mine Planning for the Company and is a Professional Engineer registered with the Association of Professional Engineers and Geoscientists of the Province of British Columbia (#48305) and a Qualified Person as defined by National Instrument 43-101- Standards of Disclosure for Mineral Projects. Mr. Sinuhaji has reviewed and approved the scientific and technical information contained in this news release and has verified the underlying data.
About Fortuna Silver Mines Inc.
Fortuna Silver Mines Inc. is a Canadian precious metals mining company with operations in Peru, Mexico and Argentina. Sustainability is integral to all our operations and relationships. We produce silver and gold and generate shared value over the long-term for our shareholders and stakeholders through efficient production, environmental protection and social responsibility. For more information, please visit our website at www.fortunasilver.com.
ON BEHALF OF THE BOARD
Jorge A. Ganoza
President, CEO, and Director
Fortuna Silver Mines Inc.
Investor Relations:
Carlos Baca | T (Peru): +51.1.616.6060, ext. 0
Forward-looking Statements
This news release contains forward-lookingstatements which constitute “forward-looking information” within the meaning of applicable Canadian securities legislationand “forward-looking statements” within the meaning of the “safe harbor” provisions of the Private SecuritiesLitigation Reform Act of 1995 (collectively, “Forward-looking Statements”). All statements included herein, other than statementsof historical fact, are Forward-looking Statements and are subject to a variety of known and unknown risks and uncertainties which couldcause actual events or results to differ materially from those reflected in the Forward-looking Statements. The Forward-looking Statementsin this news release may include, without limitation, statements about the Company’s plans for its mines and mineral properties;the Company’s anticipated performance in 2021; estimated production forecasts and sales for 2021; estimated production costs andall-in sustaining cash costs for 2021; the duration and impacts of COVID-19 on the Company’s production, workforce, business, operationsand financial condition; metal price estimates, estimated metal grades in 2021; the estimated amount of ore to be placed on the leachpad at the Lindero Mine in 2021, the grade of gold and the amount of gold estimated to be contained therein; the Company’s businessstrategy, plans and outlook; the merit of the Company’s mines and mineral properties; mineral resource and reserve estimates; productioncosts; timelines; the future financial or operating performance of the Company; expenditures; approvals and other matters. Often, butnot always, these Forward-looking Statements can be identified by the use of words such as “estimated”, “potential”, “open”, “future”, “assumed”, “projected”, “used”, “detailed”, “has been”, “gain”, “planned”, “reflecting”, “will”, “anticipated”, “estimated” “containing”, “remaining”, “to be”, or statements that events, “could”or “should” occur or be achieved and similar expressions, including negative variations.
| - 5 - |
| --- |
Forward-looking Statements involve known andunknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materiallydifferent from any results, performance or achievements expressed or implied by the Forward-looking Statements. Such uncertainties andfactors include, among others, changes in general economic conditions and financial markets; the impact of the COVID-19 pandemic on theCompany’s mining operations and construction activities; the duration and impacts of COVID-19 on the Company’s production,workforce, business, operations and financial condition, and the risks relating to a global pandemic, which unless contained could causea slowdown in global economic growth; uncertainties related to the impacts of COVID-19 which may include: changing market conditions,changing restrictions on the mining industry in the countries in which the Company operates, the ability to operate as a result of governmentimposed restrictions, including restrictions on travel, the transportation of concentrates and doré, access to refineries, theimpact of additional waves of the pandemic or increases of incidents of COVID-19 in the countries in which we operate; the duration ofany suspension of operations at the Company’s mines as a result of COVID-19 which may affect production and the Company’ businessoperations and financial condition; changes in prices for gold, silver and other metals; changes in the prices of key supplies; technologicaland operational hazards in Fortuna’s mining and mine development activities; risks inherent in mineral exploration; uncertaintiesinherent in the estimation of mineral reserves, mineral resources, and metal recoveries; changes to current estimates of mineral reservesand resources; changes to production and cost estimates; governmental and other approvals; changes in government, political unrest orinstability in countries where Fortuna is active; fluctuations in currencies and exchange rates; the imposition of capital control incountries in which the Company operates; labor relations issues; as well as those factors discussed under “Risk Factors” inthe Company's Annual Information Form. Although the Company has attempted to identify important factors that could cause actual actions,events or results to differ materially from those described in Forward-looking Statements, there may be other factors that cause actions,events or results to differ from those anticipated, estimated or intended.
Forward-looking Statements contained hereinare based on the assumptions, beliefs, expectations and opinions of management, including but not limited to the accuracy of the Company’scurrent mineral resource and reserve estimates; that the Company’s activities will be in accordance with the Company’s publicstatements and stated goals; that there will be no material adverse change affecting the Company or its properties; that the reconciliationof mineral reserves at the Lindero Mine remains consistent with the mineral reserve model; changes to production estimates (which assumeaccuracy of projected ore grade, mining rates, recovery timing, and recovery rate estimates and may be impacted by unscheduled maintenance,labour and contractor availability and other operating or technical difficulties); the duration and impacts of COVID-19 on the Company’sproduction, workforce, business, operations and financial condition, and the risks relating to a global pandemic, which unless containedcould cause a slowdown in global economic growth; government mandates in Peru, Mexico and Argentina with respect to mining operationsgenerally or auxiliary businesses or services required for the Company’s operations; government and the Company’s attemptsto reduce the spread of COVID-19 which may affect may aspects of the Company’s operations, including transportation of personnelto and from site, contractor and supplier availability and the ability to sell or deliver concentrate and doré; the expected trendsin mineral prices and currency exchange rates; that the Company’s activities will be in accordance with the Company’s publicstatements and stated goals; that there will be no material adverse change affecting the Company or its properties; that all requiredapprovals will be obtained for the Company’s business and operations; that there will be no significant disruptions affecting operationsand such other assumptions as set out herein. Forward-looking Statements are made as of the date hereof and the Company disclaims anyobligation to update any Forward-looking Statements, whether as a result of new information, future events or results or otherwise, exceptas required by law. There can be no assurance that these Forward-looking Statements will prove to be accurate, as actual results and futureevents could differ materially from those anticipated in such statements. Accordingly, investors should not place undue reliance on Forward-lookingStatements.
| - 6 - |
| --- |
Non-GAAP Financial Measures
This news release also refers to non-GAAP financialmeasures, such as cash cost per tonne of processed ore. These measures do not have a standardized meaning or method of calculation, eventhough the descriptions of such measures may be similar. These performance measures have no meaning under International Financial ReportingStandards (IFRS) and therefore, amounts presented may not be comparable to similar data presented by other mining companies.
Cautionary Note to United States InvestorsConcerning Estimates of Reserves and Resources
Reserve and resource estimates included inthis news release have been prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI43-101") and the Canadian Institute of Mining, Metallurgy, and Petroleum Definition Standards on Mineral Resources and Mineral Reserves.NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for public disclosure by a Canadiancompany of scientific and technical information concerning mineral projects. Equivalent U.S. reporting requirements are currently governedby the United States Securities and Exchange Commission ("SEC") Industry Guide 7 (“Industry Guide 7”) under theU.S. Securities Act of 1933, as amended. Canadian standards, including NI 43-101, differ significantly from the requirements of the SECcurrently in effect under Industry Guide 7, and reserve and resource information contained in this news release may not be comparableto similar information disclosed by U.S. companies. In particular, the term "resource" does not equate to the term "reserves".Under the SEC's disclosure standards currently in effect under Industry Guide 7, mineralization may not be classified as a "reserve"unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time thereserve determination is made. While the SEC recognizes the reporting of mineral deposits which do not meet the Industry Standard Guide7 definition of “reserve” as of February 25, 2019, the effective adoption of the Modernization of Property Disclosures forMining Registrants, such rules are not required to be compiled with until the first fiscal year beginning on or after January 1, 2021.As a result, the SEC's disclosure standards currently in effect normally do not permit the inclusion of information concerning "measuredmineral resources", "indicated mineral resources" or "inferred mineral resources" or other descriptions of theamount of mineralization in mineral deposits that do not constitute "reserves" by U.S. standards in documents filed with theSEC. You are cautioned not to assume that resources will ever be converted into reserves. You should also understand that "inferredmineral resources" have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legalfeasibility. You should also not assume that all or any part of an "inferred mineral resource" will ever be upgraded to a highercategory. Under Canadian rules, estimated "inferred mineral resources" may not form the basis of feasibility or pre-feasibilitystudies except in rare cases. You are cautioned not to assume that all or any part of an "inferred mineral resource" existsor is economically or legally mineable. Disclosure of "contained ounces" in a resource is permitted disclosure under Canadianregulations; however, the SEC's disclosure standards currently in effect under Industry Guide 7 normally only permit issuers to reportmineralization that does not constitute "reserves" by such standards as in-place tonnage and grade without reference to unitmeasures. The requirements of NI 43-101 for identification of "reserves" are also not the same as those of the SEC's disclosurestandards currently in effect under Industry Guide 7, and reserves reported in compliance with NI 43-101 may not qualify as "reserves"under such SEC standards. Accordingly, information concerning mineral deposits set forth in this news release may not be comparable withinformation made public by companies that report in accordance with U.S. standards.