Silver North Resources Ltd 6-K, filed Feb 3, 2026
Silver North Resources Ltd. (TARSF)
About this 6-K
Silver North Resources Ltd filed this 6-K on February 3, 2026.
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
REPORT OF FOREIGN ISSUER PURSUANT TO RULE 13a-16 AND 15d-16 UNDER THE SECURITIES EXCHANGE ACT OF 1934
For the Month of October 2025
File No. 000-55193
Silver North Resources Ltd.
(Name of Registrant)
410 – 325 Howe Street Vancouver, British Columbia, Canada V6C 1Z7
(Address of principal executive offices)
Indicate by check mark whether the Registrant files or will file annual reports under cover of Form 20-F or Form 40-F FORM 20-F x FORM 40-F ¨
SIGNATURE
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this Form 6-K to be signed on its behalf by the undersigned, thereunto duly authorized.
Silver North Resources Ltd.
(Registrant)
Dated: February 2, 2026 | By: /s/ “Winnie Wong” Winnie Wong, Chief Financial Officer |
Exhibits:
99.1News Release dated October 16, 2025
99.2News Release dated October 28, 2025
99.3News Release dated November 13, 2025
99.4News Release dated November 17, 2025
| Trading Symbol (TSX-V: SNAG) 410-325 Howe Street Vancouver, British Columbia Canada V6C 1Z7 Tel: (604) 687 3520 Fax: 1-888-889-4874 www.silvernorthres.com |
|
|
| NR 25-16 |
Drilling Continues at Silver North’s Flagship Haldane Silver Property, Yukon
·Six holes completed to date at the Main Fault target.
·Program goal is to delineate down-dip and strike potential of the 2024 Main Fault discovery where three stacked high grade silver bearing veins were intersected within a structural zone that returned 28.36m (true width) of 130 g/t silver, 0.09 g/t gold, 0.55 % lead and 0.52% zinc.
Vancouver, BC, October 16, 2025 – Silver North Resources Ltd. (TSX-V: SNAG, OTCQB: TARSF) “Silver North” or the “Company”) provides an update on the ongoing 2025 exploration program at the Company’s flagship Haldane Silver Property in the historic Keno Hill Silver District, Yukon. To date, six holes (totaling 1,300 metres) have been completed at the Main Fault target. Of these, five holes have been sampled and sent for analysis, with one in progress. The road-accessible 8,579 hectare Haldane Property is located 25 km west of Keno City, YT, adjacent to Hecla Mining’s producing Keno Hill Silver Mine property, and hosts numerous occurrences of silver-lead-zinc-bearing quartz siderite veins as seen elsewhere in the district.
“As we outlined before the start of the program at Haldane, the focus of the 2025 program is to expand upon the discovery made at the Main Fault last year,” stated Jason Weber, P.Geo., President and CEO of Silver North. “We have successfully tested the strike extension on sections to the northeast as well as to the southwest. We have yet to receive analytical results from the initial holes but expect to have the first set of results in early November.”
The 2025 diamond drilling program is targeting expansion of Keno-style silver lead-zinc mineralization at the newly identified Main Fault target, a wide zone with at least three high grade silver veins identified to date. Holes HLD24-29 and -30 intersected high grade mineralization such as 1.83m (true width) of 1,088 g/t silver, 3.90 g/t gold, 1.89% lead and 0.63% zinc as well as wider zones of silver mineralization including 5.8 m (true width) 365 g/t silver, 0.23 g/t gold, 1.80 % lead and 1.37 % zinc (refer to Silver North’s news release dated November 14th, 2024). The first hole of the program (HLD25-31) tested the continuity of mineralization approximately 80 m further down dip of the 2024 intersections. The remaining holes are testing mineralization on sections approximately 50 and 100 metres southwest and 50 metres northeast of the discovery section to test the strike and depth continuity of mineralization.
Silver North has engaged Paycore Diamond Drilling as the drill contractor for the program and Hardline Exploration Services Ltd, to provide staffing, technical and camp support. The program is expected to be completed in early November.
About Silver North Resources Ltd.
Silver North’s primary assets are its 100% owned Haldane Silver Project (next to Hecla Mining Inc.’s Keno Hill Mine project), the Tim Silver Project (under option to Coeur Mining, Inc. in the Silvertip/Midway District, BC and Yukon) and the GDR project also in the Silvertip/Midway district. Silver North also plans to acquire additional silver properties in favourable jurisdictions.
The Company is listed on the TSX Venture Exchange under the symbol “SNAG”, trades on the OTCQB market in the United States under the symbol “TARSF”, and under the symbol “I90” on the Frankfurt Stock Exchange.
Mr. Jason Weber, P.Geo., President and CEO of Silver North Resources Ltd. is a Qualified Person as defined by National Instrument 43-101. Mr. Weber supervised the preparation of the technical information contained in this release and approved the news release.
For further information, contact:
Jason Weber, President and CEO
Sandrine Lam, Shareholder Communications
Tel: (604) 807-7217
Fax: (888) 889-4874
To learn more visit: www.silvernorthres.com
X: https://X.com/SilverNorthRes
LinkedIn: https://www.linkedin.com/company/silvernorth-res-ltd/
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE. STATEMENTS IN THIS NEWS RELEASE, OTHER THAN PURELY HISTORICAL INFORMATION, INCLUDING STATEMENTS RELATING TO THE COMPANY'S FUTURE PLANS AND OBJECTIVES OR EXPECTED RESULTS, MAY INCLUDE FORWARD-LOOKING STATEMENTS. FORWARD-LOOKING STATEMENTS ARE BASED ON NUMEROUS ASSUMPTIONS AND ARE SUBJECT TO ALL OF THE RISKS AND UNCERTAINTIES INHERENT IN RESOURCE EXPLORATION AND DEVELOPMENT. AS A RESULT, ACTUAL RESULTS MAY VARY MATERIALLY FROM THOSE DESCRIBED IN THE FORWARD- LOOKING STATEMENTS.
| Trading Symbol (TSX-V: SNAG) 410-325 Howe Street Vancouver, British Columbia Canada V6C 1Z7 Tel: (604) 687 3520 Fax: 1-888-889-4874 www.silvernorthres.com |
|
|
| NR25-17 |
Silver North’s Veronica Property Yields Silver Discovery at Betty Target
·Prospecting and mapping confirms Carbonate Replacement Deposit (“CRD”) potential at Veronica – similar to that found at Coeur Mining’s Silvertip Mine, located 12 km south.
·Soil sampling extended the multi-element (silver-lead±zinc) Betty soil geochemical anomaly from 450 m by 450 m to 1000 m by 1000 m, which remains open to the east and south.
·Prospecting discovered high-grade silver mineralization in float, coincident with the Betty target, including 2,860 g/t silver from a float cobble.
Vancouver, BC, October 28, 2025 - Silver North Resources Ltd. (TSX-V: SNAG, OTCQB: TARSF) (“Silver North” or the “Company”) is pleased to announce analytical results from the 2025 field exploration program at the Veronica Property, one of three properties comprising the GDR Project in southern Yukon Territory (Figure 1). Results of the program, which included prospecting, geological mapping, soil geochemical sampling and hand trenching include the expansion of the previously identified multi-element soil geochemical anomaly (the Betty target) as well as the discovery of silver-bearing mineralization in float cobbles (2,860 and 213 g/t silver) and in outcrop (33.7 and 17.15 g/t silver). Prior to the 2025 program, no silver-bearing mineralization had been discovered on the Veronica property.
“Our goal with the 2025 program at Veronica was to assess the property’s potential to host Carbonate Replacement Deposit (CRD) style mineralization,” stated Jason Weber, P.Geo., President and CEO of Silver North. “These analytical results, from silver-bearing galena in structurally controlled replacement-style mineralization are a strong positive indicator that Veronica may be another CRD target in this emerging district.”
Previous operators identified a 450 m by 450 m silver-lead±zinc multi-element soil geochemical anomaly in 2016 (according to a filed, but unpublished, assessment report by the property vendors and filed with the Yukon government), which was the focus of the 2025 program. The 2025 program successfully expanded this anomaly to over 1 km by 1 km in size (now termed the “Betty Anomaly” or “Betty Target”). The Betty Anomaly is now defined as a coincident silver (1 ppm to 31.1 ppm), lead (50 ppm to 8850 ppm) and zinc (200 ppm to 3830 ppm) anomaly that remains open to the east, and potentially to the south.
Mapping and prospecting work at the Betty Anomaly discovered the first ever mineralization found at Veronica, consisting of massive galena-bearing cobbles in float, and subsequently, in outcrop. Float cobbles found on surface include a 15-cm wide massive sulphide cobble which returned 2,860 g/t Ag, 0.412 g/t Au, >1% Pb, 0.13% Cu, 0.18% Zn and 2,250 ppm Sb, (Sample K665269) and a cobble uncovered in a hand trench in the same area that returned 213 g/t Ag, >1% Pb and 367 ppm Sb (Sample K665270). These areas collectively make up the Lodge Showing (Figures 2 and 3).
Approximately 100 m to the northeast of the Lodge Showing, an outcropping brecciated and silicified fault zone was discovered, the Cooper Showing, hosting disseminated and blebby galena. Grab samples from the outcropping structure returned 33.17 g/t Ag, greater than 1% lead, 0.4% Zn and 26 ppm Sb (Sample E812425), and 17.15 g/t Ag, 0.71% Pb, 0.17% Zn and 22.3 ppm Sb (E82424) (Figures 2 and 3).
Overlimit analyses for lead are currently underway and will be released once received.
Geological mapping indicates the potential preservation of the prospective stratigraphy known for hosting high grade silver-lead-zinc mineralization at Silvertip.
The 2025 exploration program was undertaken and partially funded under a grant from the Government of Yukon, under its Yukon Mineral Exploration Program (“YMEP”). Under this program, qualifying exploration expenditures can be refunded to the Company in the form of a grant of up to $30,000. The 2025 program was conducted over an eight-day period, consisting of prospecting, mapping, soil geochemical sampling and hand trenching. A total of 453 soil samples and 26 rock samples were collected, while two hand trenches and eight additional hand-excavated pits were completed.
The Veronica claims, part of the recently optioned GDR project, are located adjacent to the Tim Property (under separate option to Coeur Mining), in the Silvertip area of southern Yukon Territory. Exploration in the region is targeting high grade silver-lead-zinc mineralization similar to that found at the Silvertip Mine, approximately 12 km to the southwest of Veronica.
Analytical and Chain of Custody
Following the field program, all samples were secured on site and transported to the office of Archer, Cathro & Associates (1981) Limited before being delivered to ALS Minerals in Whitehorse, Yukon. All samples were prepared at ALS Minerals in Whitehorse before being transported to the ALS laboratory (an independent accredited laboratory) in North Vancouver, British Columbia for analysis.
Rock and soil samples were analyzed using four-acid digestion with an ICP-MS finish (ME-MS61). Gold analysis was by fire assay with atomic absorption finish (Au-ICP21). Over-limit analysis for silver was completed using Ore Grade four acid digestion (ME-OG62) and by fire assay and gravimetric finish (Ag-GRA21 – 30g sample). Over-limit analysis for lead is currently being completed using Ore Grade four acid digestion (ME-OG62).
Grab and float rock samples collected in the program are selective by nature and may not necessarily represent the overall grade of underlying mineralization. Soil geochemical surveys conducted prior to Silver North’s agreement to option the Veronica property consisted of grid (50 m samples on 100 m spaced lines) and ridgeline sampling (approximately) every 100 m. Approximately 453 soil samples were collected in kraft soil bags and analyzed using a 30g fire assay method for gold and standard ICP spectroscopy (Inductively Coupled Plasma) for 50 additional elements. Samples were analyzed at ALS Laboratories.
A brief video update to accompany this news release can be found at:
https://vrify.com/meetings/recordings/55c947d9-5b67-48e2-8c2d-d99d39cb0fa9
Figure 1: Location Map
Figure 2: Compilation – Silver in soil geochemistry
Figure 3: Compilation – Lead in soil geochemistry
About Silver North Resources Ltd.
Silver North’s primary assets are its 100% owned Haldane Silver Project (next to Hecla Mining Inc.’s Keno Hill Mine project), the Tim Silver Project (under option to Coeur Mining, Inc. in the Silvertip/Midway District, BC and Yukon) and the GDR project also in the Silvertip/Midway district. Silver North also plans to acquire additional silver properties in favourable jurisdictions.
The Company is listed on the TSX Venture Exchange under the symbol “SNAG”, trades on the OTCQB market in the United States under the symbol “TARSF”, and under the symbol “I90” on the Frankfurt Stock Exchange.
Qualified Person
Mr. Kelson Willms, P.Geo., of Archer, Cathro and Associates (1981) Limited is a Qualified Person as defined under the terms National Instrument 43-101 and has reviewed and approved the technical information in this news release.
For further information, contact:
Jason Weber, President and CEO
Sandrine Lam, Shareholder Communications
Tel: (604) 807-7217
Fax: (888) 889-4874
To learn more visit: www.silvernorthres.com
X: https://X.com/SilverNorthRes
LinkedIn: https://www.linkedin.com/company/silvernorth-res-ltd/
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE. STATEMENTS IN THIS NEWS RELEASE, OTHER THAN PURELY HISTORICAL INFORMATION, INCLUDING STATEMENTS RELATING TO THE COMPANY'S FUTURE PLANS AND OBJECTIVES OR EXPECTED RESULTS, MAY INCLUDE FORWARD-LOOKING STATEMENTS. FORWARD-LOOKING STATEMENTS ARE BASED ON NUMEROUS ASSUMPTIONS AND ARE SUBJECT TO ALL OF THE RISKS AND UNCERTAINTIES INHERENT IN RESOURCE EXPLORATION AND DEVELOPMENT. AS A RESULT, ACTUAL RESULTS MAY VARY MATERIALLY FROM THOSE DESCRIBED IN THE FORWARD- LOOKING STATEMENTS.
| Trading Symbol (TSX-V: SNAG) 410-325 Howe Street Vancouver, British Columbia Canada V6C 1Z7 Tel: (604) 687 3520 Fax: 1-888-889-4874 www.silvernorthres.com |
|
|
| NR 25-18 |
Drilling Completed at Silver North’s Flagship Haldane Silver Property, Yukon
·Eight holes completed at the Main Fault target.
·Program successfully tested Main Fault structure 150m along strike and up to 150m down dip.
Vancouver, BC, November 13, 2025 – Silver North Resources Ltd. (TSX-V: SNAG, OTCQB: TARSF) “Silver North” or the “Company”) announces that the Company has completed the 2025 exploration program at its flagship Haldane Silver Property in the historic Keno Hill Silver District, Yukon. A total of eight holes (totalling 1,759.5 metres) were completed. The road-accessible 8,579 hectare Haldane Property is located 25 km west of Keno City, YT, adjacent to Hecla Mining’s producing Keno Hill Silver Mine property, and hosts numerous occurrences of silver-lead-zinc-bearing quartz siderite veins resembling the ore-bearing veins being mined at Keno Hill.
“Our primary goal for the 2025 drill program was to test the strike and depth continuity of the Main Fault target. I’m very pleased that we have been able to achieve that goal with the program. We are now eagerly awaiting the assay results,” stated Jason Weber, P.Geo., President and CEO of Silver North. “As with all drill programs, it is a team effort and we’d like to thank all those involved in helping us this season.”
The eight holes were completed from four pads testing approximately 150 m of strike along the Main Fault structure and a maximum of 150 m down dip on one section. All analytical sampling has been completed and all samples submitted. Results from samples submitted from the initial holes are expected imminently and will be made public once they have been verified and interpreted.
In addition to the drilling completed in 2025, over 15 km2 of LiDAR and photogrammetry survey was conducted over the core of the Haldane Property known as the Mt Haldane Vein System (MHVS). The MHVS is host to the majority of the vein targets, including the Main, West and Middlecoff targets, as well as the Johnson target, where small-scale high grade silver production occurred in the early 1900s. These surveys will help identify structural lineaments and provide stronger topographic control to aid in targeting drilling and modelling the vein systems at Haldane. Another area was also flown to address possible alternate access routes that may be contemplated as the project moves forward.
About Silver North Resources Ltd.
Silver North’s primary assets are its 100% owned Haldane Silver Project (next to Hecla Mining Inc.’s Keno Hill Mine project), the Tim Silver Project (under option to Coeur Mining, Inc. in the Silvertip/Midway District, BC and Yukon) and the GDR project also in the Silvertip/Midway district. Silver North also plans to acquire additional silver properties in favourable jurisdictions.
The Company is listed on the TSX Venture Exchange under the symbol “SNAG”, trades on the OTCQB market in the United States under the symbol “TARSF”, and under the symbol “I90” on the Frankfurt Stock Exchange.
Mr. Jason Weber, P.Geo., President and CEO of Silver North Resources Ltd. is a Qualified Person as defined by National Instrument 43-101. Mr. Weber supervised the preparation of the technical information contained in this release and approved the news release.
For further information, contact:
Jason Weber, President and CEO
Sandrine Lam, Shareholder Communications
Tel: (604) 807-7217
Fax: (888) 889-4874
To learn more visit: www.silvernorthres.com
X: https://X.com/SilverNorthRes
LinkedIn: https://www.linkedin.com/company/silvernorth-res-ltd/
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE. STATEMENTS IN THIS NEWS RELEASE, OTHER THAN PURELY HISTORICAL INFORMATION, INCLUDING STATEMENTS RELATING TO THE COMPANY'S FUTURE PLANS AND OBJECTIVES OR EXPECTED RESULTS, MAY INCLUDE FORWARD-LOOKING STATEMENTS. FORWARD-LOOKING STATEMENTS ARE BASED ON NUMEROUS ASSUMPTIONS AND ARE SUBJECT TO ALL OF THE RISKS AND UNCERTAINTIES INHERENT IN RESOURCE EXPLORATION AND DEVELOPMENT. AS A RESULT, ACTUAL RESULTS MAY VARY MATERIALLY FROM THOSE DESCRIBED IN THE FORWARD- LOOKING STATEMENTS.
| Trading Symbol (TSX-V: SNAG) 410-325 Howe Street Vancouver, British Columbia Canada V6C 1Z7 Tel: (604) 687 3520 Fax: 1-888-889-4874 www.silvernorthres.com |
|
|
| NR 25-19 |
Silver North Intersects 13.15 metres Averaging 818 g/t Silver and 1.39 g/t Gold from 249.9 m Depth at the Haldane Silver Property, Keno District, Yukon
·Results received from three holes at the Main Fault target.
·The first hole of the 2025 program extended mineralization 90 m downdip from 2024 discovery intersections.
·5 additional holes to be reported.
Vancouver, BC, November 17, 2025 – Silver North Resources Ltd. (TSX-V: SNAG, OTCQB: TARSF) “Silver North” or the “Company”) announces that the Company has received results from the first three holes completed during the 2025 exploration program at its flagship Haldane Silver Property in the historic Keno Hill Silver District, Yukon. Results include 3.2 metres averaging 2014 g/t silver, 1.72 g/t gold, 4.73% lead and 1.1% zinc within a larger 13.15 metre intersection of 818 g/t silver, 1.39 g/t gold, 2.54% lead and 0.98% zinc. A total of eight holes (totalling 1,759.5 metres) were completed in the 2025 program. The road-accessible 8,579 hectare Haldane Property is located 25 km west of Keno City, YT, adjacent to Hecla Mining’s producing Keno Hill Silver Mine property, and hosts numerous occurrences of silver-lead-zinc-bearing quartz siderite veins resembling the ore-bearing veins being mined at Keno Hill.
“We are extremely pleased with the results of the 2025 program so far, highlighted by the 90 m downdip step out from last year’s discovery holes at the Main Fault,” stated Jason Weber, P.Geo., President and CEO of Silver North. “The width and grades of the mineralized portion of the structure at the Main Fault continue to impress: HLD25-31 is the best hole drilled on the property to date. We saw some indication of higher gold grades with some portions of the mineralized structure in 2024. With this downdip hole, we are seeing consistent high-grade silver with significantly higher gold concentrations than seen at other targets on the property.”
HLD25-31 was drilled from the same pad as the 2024 discovery holes at the Main Fault (see news release dated November 14, 2024). The hole intersected the Main Fault approximately 90 m downdip from HLD24-30, yielding a 13.15 m mineralized intersection averaging 818 g/t silver, 1.39 g/t gold, 2.54% lead and 0.98% zinc from 249.9 metres down hole. A sub-interval of this mineralization averaged 2014 g/t silver, 1.72 g/t gold, 4.73% lead and 1.1% zinc over 3.2 m from 251.8 m, while another sub-interval starting at 256.1 m averaged 1112 g/t silver, 4.61 g/t gold, 7.11% lead and 1.51% zinc over 1.25 m. The HLD25-31 intersection appears to indicate a steeping of the structure versus the apparent dip in holes HLD24-29 and 30. Additionally, the elevated gold grades observed in the hanging wall intersection of HLD24-30 are observed throughout the entire 13.15 m interval. As with other intersections at the Main Fault and elsewhere on the Haldane property, mineralization consists of siderite +/- quartz, galena and sphalerite veins and breccias, as well as strongly faulted and ground up vein and vein breccia material.
Table 1: 2025 Drilling – Significant Results
Hole | From (m) | To (m) | Interval (m) | Ag (g/t) | Au (g/t) | Pb (%) | Zn (%) | Silver Eq1 |
HLD25-31 | 249.90 | 263.05 | 13.15 | 818 | 1.39 | 2.54 | 0.98 | 896 |
incl | 251.80 | 255.00 | 3.20 | 2014 | 1.72 | 4.73 | 1.10 | 2055 |
incl | 256.10 | 257.35 | 1.25 | 1112 | 4.61 | 7.11 | 1.51 | 1446 |
|
|
|
|
|
|
|
|
|
HLD25-32 | 153.00 | 175.65 | 22.65 | 160 | 0.23 | 0.75 | 0.80 | 187 |
incl | 165.10 | 171.60 | 6.50 | 326 | 0.19 | 0.81 | 1.30 | 346 |
and incl | 169.00 | 169.80 | 0.80 | 1438 | 0.51 | 2.78 | 1.60 | 1428 |
|
|
|
|
|
|
|
|
|
HLD25-33 | 193.49 | 199.05 | 5.56 | 176 | 0.11 | 1.33 | 1.96 | 224 |
incl | 195.35 | 197.80 | 2.45 | 311 | 0.17 | 1.51 | 3.27 | 376 |
1Silver-equivalent values are calculated assuming typical recoveries based on metallurgical studies conducted on a range of analogous epithermal vein deposits and are not necessarily reflective of metallurgy on the property. No metallurgical work has been reported on the property. The recoveries used are 92% silver, 70% gold, 88% lead and 70% zinc. The silver – equivalent formula: using the formula: ((35 * silver (g/t)*0.92 / 31.1035) + (3000 * gold (g/t)*0.70 / 31.1035) + (1.00 * 2204 * lead %*0.88/100) + (1.20 * 2204 * zinc %*0.70/100)) *(31.1035 / 35). Metal price assumptions are US$35/oz silver, US$3,000/oz gold, US$1.00/lb lead and US$1.20/lb zinc. True widths are unknown.
HLD25-32 and 33 were drilled to test the Main Fault on a section 50 metres to the northeast of the HLD24-29 and 30, and HLD25-31 section. These holes successfully extended the breadth of silver-lead-zinc mineralization. HLD25-32 intersected 6.5 metres averaging 326 g/t silver, 0.19 g/t gold, 0.81% lead and 1.3% zinc from 165.1 metres including 0.80 m averaging 1,438 g/t silver, 0.51 g/t gold, 2.78% lead and 1.6% zinc. This is hosted within a broad 22.65 metre-wide mineralized zone averaging 160 g/t silver, 0.23 g/t Au, 0.75% lead and 0.80% zinc from 153.0 metres down hole.
HLD25-33 intersected the Main Fault approximately 45 m downdip of HLD25-33, yielding 2.45 m of 311 g/t silver, 0.17 g/t gold, 1.51% lead and 3.27% zinc within a 5.56 m interval of 176 g/t silver, 0.11 g/t gold, 1.33% lead and 1.96% zinc from 193.49 m down hole.
Table 2: 2025 Drilling – Collar Location Data (NAD83, UTM Zone 8)
Hole | Depth (m) | Easting (m) | Northing (m) | Elevation (m) | Azimuth | Dip |
HLD25-31 | 282.9 | 456783 | 7082994 | 1261 | 104 | -86 |
HLD25-32 | 189.0 | 456829 | 7083057 | 1274 | 130 | -68 |
HLD25-33 | 208.4 | 456783 | 7082994 | 1261 | 63 | -67 |
HLD25-34 | 203.0 | 456762 | 7082948 | 1258 | 105 | -54 |
HLD25-35 | 207.0 | 456762 | 7082948 | 1258 | 105 | -71 |
HLD25-36 | 210.0 | 456762 | 7082948 | 1258 | 63 | -55 |
HLD25-37 | 171.0 | 456729 | 7082904 | 1263 | 104 | -62 |
HLD25-38 | 220.3 | 456776 | 7082990 | 1265 | 125 | -74 |
The Company is now waiting for the analytical results from the five remaining holes completed in the 2025 program. The five remaining holes tested the Main Fault on sections 50 and 100 metres southwest of the hole 29/30/31 section.
Figure 1: Drill Hole Plan Map
Figure 2: Section D-D’
Figure 3: Section E-E’
Quality Assurance / Quality Control and Sampling Procedures
All diamond drill core from the 2025 program at the Haldane project was logged, photographed, and sawn in half using a diamond blade core saw. One half of the core was submitted for geochemical analysis, while the other half was retained in secure storage for reference. Sampling intervals were determined based on geological boundaries and typically ranged from 0.3-1.5 metres. Control samples comprised approximately 20% of all samples submitted, including certified reference standards, analytical blanks, field duplicates, preparation duplicates and analytical duplicates. QA/QC results were reviewed in real time, and all data have been verified as meeting acceptable thresholds for accuracy, precision, and contamination before inclusion in this release.
During the field program, all samples were secured on site and delivered to ALS Minerals in Whitehorse, Yukon. All samples were prepared at ALS Minerals in Whitehorse before being transported to the ALS laboratory (an independent ISO/IEC 17025 certified laboratory) in North Vancouver, British Columbia for analysis.
Samples are dried, weighed, and crushed to at least 70% passing 2mm, and a 250 g split is pulverized to at least 85% passing 75 μm (PREP-31). All samples are analyzed using a four-acid digestion and ICP-MS methods (ME-ICP61 and ME-MS61). Over-limit analyses for silver (>100 ppm), lead (>10,000 ppm), and zinc (>10,000 ppm) are re-assayed using an ore-grade four-acid digestion and ICP-AES (ME-OG62). Samples with over-limit silver assays > 1500 ppm are analyzed by 30-gram fire assay with a gravimetric finish (Ag-GRA21). Gold is assayed by 30-gram fire assay and AAS (Au-AA23).
About Silver North Resources Ltd.
Silver North’s primary assets are its 100% owned Haldane Silver Project (next to Hecla Mining Inc.’s Keno Hill Mine project), the Tim Silver Project (under option to Coeur Mining, Inc. in the Silvertip/Midway District, BC and Yukon) and the GDR project also in the Silvertip/Midway district. Silver North also plans to acquire additional silver properties in favourable jurisdictions.
The Company is listed on the TSX Venture Exchange under the symbol “SNAG”, trades on the OTCQB market in the United States under the symbol “TARSF”, and under the symbol “I90” on the Frankfurt Stock Exchange.
Mr. Jason Weber, P.Geo., President and CEO of Silver North Resources Ltd. is a Qualified Person as defined by National Instrument 43-101. Mr. Weber supervised the preparation of the technical information contained in this release and approved the news release.
For further information, contact:
Jason Weber, President and CEO
Sandrine Lam, Shareholder Communications
Tel: (604) 807-7217
Fax: (888) 889-4874
To learn more visit: www.silvernorthres.com
X: https://X.com/SilverNorthRes
LinkedIn: https://www.linkedin.com/company/silvernorth-res-ltd/
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE. STATEMENTS IN THIS NEWS RELEASE, OTHER THAN PURELY HISTORICAL INFORMATION, INCLUDING STATEMENTS RELATING TO THE COMPANY'S FUTURE PLANS AND OBJECTIVES OR EXPECTED RESULTS, MAY INCLUDE FORWARD-LOOKING STATEMENTS. FORWARD-LOOKING STATEMENTS ARE BASED ON NUMEROUS ASSUMPTIONS AND ARE SUBJECT TO ALL OF THE RISKS AND UNCERTAINTIES INHERENT IN RESOURCE EXPLORATION AND DEVELOPMENT. AS A RESULT, ACTUAL RESULTS MAY VARY MATERIALLY FROM THOSE DESCRIBED IN THE FORWARD- LOOKING STATEMENTS.