Skip to main content

Allied Gold Corp 6-K, filed Nov 18, 2026

Allied Gold Corp (AAUC)

6-K 2026-11-18 For: 2026-11-18
View Original
Added on November 18, 2026

About this 6-K

Allied Gold Corp filed this 6-K on November 18, 2026.

Allied Gold says Ethiopian Electric Power has begun installing the automated grid stabilization system needed for full power at the Kurmuk Mine. Gold sales are targeted for December, with commercial production expected by year-end. AI summary