Aura Minerals Inc 6-K, filed Aug 6, 2025
Aura Minerals Inc. (AUGO)
About this 6-K
Aura Minerals Inc filed this 6-K on August 6, 2025.
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 UNDER THE SECURITIES EXCHANGE ACT OF 1934
For the month of August 2025
Commission File Number: 001-42744
AURA MINERALS INC.
(Exact name of registrant as specified in its charter)
c/o Aura Technical Services Inc.
3390 Mary St,
Suite 116, Coconut Grove,
Florida, 33133, United States
+1 (305) 239 9332
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F:
| Form 20-F |
X |
Form 40-F |
TABLE OF CONTENTS
SIGNATURE
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
| Aura Minerals Inc. | |||||
| By: | /s/ João Kleber Cardoso | ||||
| Name: | João Kleber Cardoso | ||||
| Title: | Chief Financial Officer | ||||
Date: August 5, 2025
EXHIBIT 99.1
|
Earnings Release Q2 2025 | H1 2025 |
Aura Announces Q2 2025 and H1 2025 Financial and Operational Results
ROAD TOWN, British Virgin Islands, August 5, 2025 – Aura Minerals Inc. (NASDAQ: AUGO) (TSX: ORA) (B3: AURA33) (“Aura” or the “Company”) announces that it has filed its audited consolidated financial statements and management discussion and analysis (together, “Financial and Operational Results”) for the period ended June 30, 2025. The full version of the Financial and Operational Results can be viewed on the Company’s website at www.auraminerals.com, on SEDAR+ at www.sedarplus.ca. or on SEC www.sec.com.
“In Q2, we achieved another record-high Adjusted EBITDA of US$106 million, driven by higher production and gold price of US$3,185 / Oz, bringing our last twelve months (LTM) Adjusted EBITDA to US$344 million at an average gold price of US$2,812 / Oz. Additionally, Aura reached significant milestones, including the publication of the Preliminary Economic Assessment (PEA) for Era Dorada, the signing of a purchase agreement for MSG, and a successful IPO on Nasdaq. We also approved our quarterly dividend payment, delivering a 7.4% yield return to our shareholders over the LTM, inclusive of share buybacks. Looking ahead, we expect commercial production at Borborema, the completion of the MSG acquisition in Q3, and to meet our production and cost guidance for the year.” Commented Rodrigo Barbosa President and CEO of Aura.
Operational & Financial Headlines Q2 2025 and H1 2025
| (US$ thousand) | Q2 2025 | Q1 2025 | % | Q2 2024 | % | H1 2025 | H1 2024 | % |
| Total Production (GEO) | 64,033 | 60,087 | 7% | 64,327 | 0% | 124,120 | 132,514 | -6% |
| Total Sales (GEO) | 62,452 | 60,491 | 3% | 63,258 | -1% | 122,943 | 132,344 | -7% |
| Net Revenue | 190,436 | 161,804 | 18% | 134,411 | 42% | 352,240 | 266,489 | 32% |
| Gross Profit | 103,939 | 78,428 | 33% | 51,308 | 103% | 182,367 | 97,989 | 86% |
| Gross Margin | 55% | 48% | 6 p.p. | 38% | 16 p.p. | 52% | 37% | 15 p.p. |
| Adjusted EBITDA | 106,224 | 81,479 | 30% | 56,172 | 89% | 187,703 | 109,380 | 72% |
| Adjusted EBITDA Margin | 56% | 50% | 5 p.p. | 42% | 14 p.p. | 53% | 41% | 12 p.p. |
| Net Income | 8,147 | (73,249) | n.a. | (25,775) | -132% | (65,102) | (34,992) | n.a. |
| Net Income Margin | 4% | -45% | n.a. | -19% | -122% | -18% | -13% | n.a. |
| Adjusted Net Income¹ | 36,834 | 26,903 | 37% | 9,414 | 291% | 63,737 | 22,980 | 177% |
| Adjusted Net Income Margin | 19% | 17% | 3 p.p. | 7% | 176% | 18% | 9% | 9 p.p. |
| Cash Cost (US$/GEO) | 1,146 | 1,149 | 0% | 1,080 | 6% | - | 1,040 | -100% |
| All In Sustaining cost (US$/GEO) | 1,449 | 1,461 | -1% | 1,328 | 9% | 1,455 | 1,307 | 11% |
| Operating Cash Flow | 60,420 | 41,229 | 47% | 53,612 | 13% | 83,867 | 79,464 | 6% |
| Net Debt/LTM EBITDA | 0.8x | 0.9x | -0.1x | 0.8x | 0.0x | 0.8x | 0.8x | 0.0x |
| CAPEX | 50,327 | 51,725 | -3% | 23,575 | 113% | 102,052 | 53,278 | 92% |
1. Adjusted Net Income of Q1 2025 does not consider deffered taxes over non-monetary items.
Except as otherwise noted in this document, references herein to “US$” or and “$” are to thousands of United States dollars
Headlines
| · | Total production in Q2 2025 reached 64,033 gold equivalent ounces (“GEO”), 7% higher than Q1 2025 and in line compared to the same period last year at current metal prices. At constant metal prices, production increased by 9% when compared to both Q1 2025 and Q2 2024. During the quarter, Aura commenced operations at Borborema — anticipated to be one of the Company’s largest and lowest cash cost operations. In H1 2025, production was 124,120 GEO an increase when compared to the result of H1 2024 of 122,680 GEO, at constant prices. Compared to the public guidance for 2025, this total production represents 47% of the low proposed guidance and 41% of the high proposed guidance, reinforcing the Company's confidence in meeting the 2025 production guidance, since Borborema is still in the ramp up phase. |
| · | Sales volumes was 62,452 in GEO this quarter, a decrease by 1% in Q2 2025 from Q2 2024 and increased by 3% when compared to the previous quarter. This result in the quarter was in line with Aura’s expectation, reflecting Apoena mine’s investment phase and also due to lower sales volumes at Aranzazu, considering the negative impact of the copper to gold conversion (despite the total sale copper was 16,815 Klb, a 30% increase compared to Q2 2024 and 23% higher than Q1 2025) and Minosa, all partially offset by the |
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

| · | preliminary production of Borborema and higher sales volumes at Almas. Compared to the same period of 2024, sales decreased mainly due to lower production at Minosa and Apoena, gold prices that negatively impacted GEO conversion at Arazanzu. In H1 2025, sales volumes decreased by 7%, mainly due to lower sales volumes at Aranzazu (due to GEO conversion), Apoena and Minosa. |
| · | Net Revenues reached a record high of US$190,436 in Q2 2025, representing an increase of 42% compared to Q2 2024 and an increase of 18% when compared to Q1 2025, mainly due to higher gold price. In H1 2025, revenues reached US$352,240, an increase of 32% compared to the same period of 2024. |
| o | Average net realized gold sale prices increased by 14% in Q2 2025 compared to Q1 2025, with an average of US$3,185/oz in the quarter. Compared to Q2 2024, average net realized gold sale prices increased 44% (US$2,208). In H1 2025, average net realized gold sale prices reached US$2,986, a 42% increase when compared to H1 2024. |
| o | Average realized copper sale prices increased 5% compared to Q1 2025, with an average of US$4.46/lb in the quarter, and were in line with the same period in 2024. In H1 2025, average copper sale prices reached US$4.36, a 5% increase when compared to H1 2024. |
| · | Adjusted EBITDA reached another record high of US$106,224 in Q2 2025, marking the fourth consecutive quarterly record reported by Aura. The increase was driven by a combination of higher gold prices, cash costs under control and increase in sales in Q2 2025 compared to Q1 2025. When compared to Q2 2024, Adjusted EBITDA reached a 90% increase. |
| · | AISC for Q2 2025 was US$1,449/GEO, a decrease by 1% when compared to Q1 2025 (US$1,461/GEO) and an increase of 9% over the Q2 2024, in line with the Company’s expectations. At constant Q2 2024 metal prices, AISC would have been US$1,312 in the quarter, a decrease of 1% compared to Q2 2024, due to lower AISC at Almas, Aranzazu (at constant prices) and Apoena. |
| · | The Company's Net Debt reached US$280,560 by Q2 2025, due to capex of US$50.3 million, mostly related to the final phase of construction of the Borborema Project, dividends of US$29.8 million, annual income taxes paid of US$29.5 million and reduction of US$13.7 million in debt due to the settlement of Nemesia SARL debt related to the Bluestone acquisition. The net debt-to-last 12 months EBITDA ratio reduced to 0.8x at the end of Q2 2025, from 0.9x at the end of Q1 2025. |
OTHER UPDATES:
U.S. Public Offering: In July 2025, Aura concluded its U.S. Initial Public Offering (“IPO”) of 8,100,510 common shares, at a public offering price of US$24.25 per common share. Aura raised around US$196 million. The common shares were listed on the Nasdaq Global Select Market under the ticker symbol “AUGO” and began trading on July 16, 2025. The U.S. listing is part of Aura’s strategy to unlock value for our shareholders, improve liquidity of its common shares, as well as strengthen and diversify its shareholder base through broader access to global capital markets.
Borborema Ramp-Up and First once sold: Borborema Project (“Borborema”) started its ramp-up phase on schedule and on budget, with the mine and plant currently in operation, and it produced in Q2 2025 totaled 2,577 GEO following the project’s first gold pour. Borborema is poised to become a cornerstone asset for Aura, anticipated to deliver the second highest annual gold production among the Company’s five operating mines. Built in just 19 months with zero lost time incidents, the project exemplifies Aura’s commitment to developing simple, scalable, and efficient operations. It also sets a benchmark in ESG performance, incorporating renewable energy sources and utilizing grey water from the local municipality. Aura believes that Borborema remains on track to declare commercial production by the end of Q3 2025.
Acquisition of MSG (Mineração Serra Grande Gold) Mine in Goiás, Brazil: In June 2025, Aura announced the acquisition from AngloGold all of the issued and outstanding securities of Mineração Serra Grande S.A. (“MSG”), owner of the MSG gold mine located in Crixás, in the state of Goiás, Brazil. In consideration for the acquisition of MSG, Aura will pay to AngloGold: (i) an upfront cash consideration of US$ 76 million on closing subject to certain
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

working capital adjustments as at the closing date; plus (ii) deferred consideration payments equivalent to a 3% net smelter returns participation over the currently identified Mineral Resource of MSG (inclusive of the Mineral Reserve) payable quarterly. The Transaction excludes certain current subsidiaries of MSG, which hold assets that do not form part of MSG’s mining operations or Mineral Resources and Mineral Reserves. These subsidiaries will be spun off from MSG prior to the closing of the Transaction. The closing of the Transaction is expected to happen by Q3 2025, and no later than Q4 2025.
Preliminary Economic Assessment for the Era Dorada Project: In June 2025, Aura filed a Preliminary Economic Assessment (“PEA”) for the Company’s wholly owned Era Dorada Project, in the United States in accordance with S-K 1300 and NI 43.101. The PEA indicated Mineral Resources of 1.9 million ounces of gold, assuming 6.35 million tonnes at 9.31 grams per tonne. The total production of approximately 1.4 million ounces of gold over a 17 years Life of Mine (“LOM”), and with average production of 91k ounces of gold for the first 4 years. Regarding CAPEX, the PEA presented a total initial implementation capex of approximately US$264 million with a payback in approximately 3.5 years after the beginning of the operation.
Exercise of Options to Acquire 100% of the Pé Quente and Carajás Projects
Aura has exercised its options to acquire 100% ownership of the Pé Quente and Carajás Projects in Brazil, as previously announced in press releases dated February 27, 2023 and May 22, 2024. These transactions reinforce Aura’s commitment to growing its resource base and exploration and development pipeline across key jurisdictions in the Americas.
| · | Pé Quente Project |
| o | 100% ownership secured; |
| o | 16,942m of drilling completed confirming mineralization across four targets; |
| o | Continuity confirmed with strike lengths up to 440m and down-dip extents up to 350m in the Nilva target; |
| o | Preliminary Meturlligcal testing planned for second semester of 2025 to support potential resource and life of mine expansion for the Matupá Project, located within a 50km radius. |
| · | Aura Carajás Project |
| o | Final US$3M payment completed to fully acquire the project; |
| o | Approximately 10,000 meters of drilling planned at Carajás in H2 2025 to support advancement; toward a maiden resource in Serra da Estrela target. |
Investment in Altamira Gold Corp. through a Private Placement: In July 2025, Aura entered into a subscription agreement with Altamira Gold Corp., acquiring 6,000,000 units at C$0.10 per unit in a non-brokered private placement, totaling C$600,000. Each unit comprises one common share and one-half of a share purchase warrant, exercisable at C$0.15 per share until June 30, 2027. Prior to this, Aura held 24,000,000 shares and 24,000,000 warrants (11.3% non-diluted, 20.3% fully diluted, as per November 2023). Post-transaction, Aura holds 30,000,000 shares and 27,000,000 warrants (11.3% non-diluted, 19.5% fully diluted). The units were acquired directly from Altamira for investment purposes due to its exploration potential.
Results Teleconference:
Date: August 6, 2025
Time: 10 a.m. (Brasília) | 9 a.m. (New York and Toronto)
Link to access: Click here
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

2. Consolidated Financial Results
2.1 Total Production and Sales (GEO)
| (GEO) | Q2 2025 | Q1 2025 | % | Q2 2024 | % | H1 2025 | H1 2024 | % |
| Production | 64,033 | 60,087 | 7% | 64,327 | 0% | 124,120 | 132,514 | -6% |
| Aranzazu | 22,281 | 20,456 | 9% | 24,692 | -10% | 42,737 | 49,693 | -14% |
| Apoena | 8,219 | 8,876 | -7% | 9,912 | -17% | 17,095 | 22,017 | -22% |
| Minosa | 18,039 | 17,654 | 2% | 19,142 | -6% | 35,693 | 38,328 | -7% |
| Almas | 12,917 | 13,101 | -1% | 10,580 | 22% | 26,018 | 22,475 | 16% |
| Borborema | 2,577 | 0 | n.a. | 0% | n.a. | 257700% | 0% | n.a. |
| Total | 64,042 | 60,087 | 7% | 64,327 | 0% | 121,552 | 132,514 | -8% |
| (GEO) | Q2 2025 | Q1 2025 | % | Q2 2024 | % | H1 2025 | H1 2024 | % |
| Sales | 62,452 | 60,491 | 3% | 63,258 | -1% | 122,943 | 132,344 | -7% |
| Aranzazu | 22,290 | 20,456 | 9% | 24,683 | -10% | 42,746 | 49,786 | -14% |
| Apoena | 8,219 | 9,408 | -13% | 8,258 | 0% | 17,627 | 21,118 | -17% |
| Minosa | 17,836 | 17,526 | 2% | 19,738 | -10% | 35,362 | 38,966 | -9% |
| Almas | 12,917 | 13,101 | -1% | 10,580 | 22% | 26,018 | 22,475 | 16% |
| Borborema | 1,190 | 0 | n.a. | 0 | n.a. | 1,190 | 0 | n.a. |
| Total | 62,452 | 60,491 | 3% | 62,452 | 63,258 | -1% |
Applies the metal sale prices in Aranzazu realized during Q2 2025: Copper price = US$4.39/lb; Gold Price = US$3,293/oz; Silver Price = US$34.27/oz.
Total production in Q2 2025 reached 64,033 gold equivalent ounces (“GEO”), 7% higher than Q1 2025 and in line compared to the same period last year at current metal prices, mainly due to negative impact from the copper-to-GEO conversion at Aranzazu. At constant metal prices, production increased by 9% when compared to both Q1 2025 and Q2 2024. The result was mainly attributable to stronger operational performance at Aranzazu, which posted higher metallurgical recoveries and improved head grades for all metals, on both an annual and quarterly basis
During the quarter, Aura commenced operations at Borborema — anticipated to be one of the Company’s largest and lowest cash cost operations. In the quarter, Borborema’s preliminary production totaled 2,577 GEO, following the project’s first gold pour. The project was completed on schedule, within 19 months, and on budget and Aura expects to achieve to declare Borborema commercial production by the end of Q3 2025.
In the first half of 2025, production reached 124,120 GEO, representing a 6% decline at current metal prices. At constant prices — which neutralize the effect of copper price fluctuations in the GEO conversion at Aranzazu — this reflects an increase over the 122,259 GEO produced in H1 2024. . At current metal prices, production in Q2 2025 was consistent with Q2 2024, and year-to-date production represents 47% of the lower end and 41% of the upper end of the full-year guidance. This performance reinforces the Company’s confidence in meeting its 2025 targets, especially considering that Borborema is still in the ramp-up phase. Excluding Borborema, total production to date accounts for 52% of the lower bound and 47% of the upper bound of the guidance range.
2.2. Net Revenue
| (US$ thousand) | Q2 2025 | Q1 2025 | % | Q2 2024 | % | H1 2025 | H1 2024 | % |
| Aranzazu | 62,508 | 50,262 | 24% | 49,240 | 27% | 112,770 | 93,402 | 21% |
| Apoena | 26,711 | 26,353 | 1% | 18,992 | 41% | 53,064 | 44,999 | 18% |
| Minosa | 55,776 | 48,062 | 16% | 41,962 | 33% | 103,838 | 79,609 | 30% |
| Almas | 41,751 | 37,127 | 12% | 24,217 | 72% | 78,878 | 48,479 | 63% |
| Borborema | 3,690 | - | n.a | - | n.a | 3,690 | - | n.a. |
| Total | 190,436 | 161,804 | 18% | 134,411 | 42% | 352,240 | 266,489 | 32% |
In Q2 2025, the Company reported Net Revenue of US$190.4 million, representing a 42% increase year-over-year and an 18% increase compared to Q1 2025. The strong performance was primarily driven by the higher metal prices, particularly gold, with the average realized gold price increasing by 44%, from US$2,208/oz in Q2 2024 to
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

US$3,185/oz in Q2 2025. Copper prices also contributed positively, with the average realized copper price increasing by 5%, from US$4.26/lb in Q2 2024 to US$4.46/lb in Q2 2025.
With this result, Net Revenues reached US$352,240 in H1 2025, an increase of 32% when compared to the same period of 2024. The result was mainly driven by higher gold prices, higher sales at Almas and the start of the Borborema Project. In H1 2025, average net realized prices reached US$2,986, a 42% increase when compared to H2 2024; and average copper prices reached US$4.36/lb, a 5% increase when compared to H2 2024.
2.3. Cash Cost and All in Sustaining Costs
| (US$/GEO) | Q2 2025 | Q1 2025 | % | Q2 2024 | % | H1 2025 | H1 2024 | % |
| Cash Cost | 1,146 | 1,149 | 0% | 1,080 | 6% | 1,147 | 1,040 | 10% |
| Aranzazu | 1,110 | 1,164 | -5% | 958 | 16% | 1,136 | 942 | 21% |
| Apoena | 1,168 | 1,228 | -5% | 1,252 | -7% | 1,200 | 940 | 28% |
| Minosa | 1,178 | 1,149 | 3% | 1,094 | 8% | 1,164 | 1,140 | 2% |
| Almas | 1,167 | 1,069 | 9% | 1,203 | -3% | 1,118 | 1,176 | -5% |
| Borborema | 936 | 0 | n.a. | 0 | n.a. | 936 | - | n.a. |
| All-in Sustaining Cost | 1,449 | 1,461 | -1% | 1,328 | 9% | 1,455 | 1,307 | 11% |
| Aranzazu | 1,514 | 1,545 | -2% | 1,206 | 26% | 1,529 | 1,235 | 24% |
| Apoena | 1,751 | 2,041 | -14% | 1,958 | -11% | 1,906 | 1,500 | 27% |
| Minosa | 1,292 | 1,249 | 3% | 1,159 | 12% | 1,271 | 1,223 | 4% |
| Almas | 1,364 | 1,195 | 14% | 1,434 | -5% | 1,279 | 1,428 | -10% |
| Borborema | 1,441 | 0 | n.a. | 0 | n.a. | 1,441 | - | n.a. |
For the second quarter of 2025, the Company’s Cash Cost was US$1,146/GEO, an increase of 6% over Q2 2024 and in line with Q1 2025, even with the preliminary production of Borborema. Year-on-year, the increase in cash cost was mainly attributed to the increase in costs at Aranzazu, mainly due to impact from the copper-to-GEO conversion in production. At constant Q2 2024 metal prices, Cash Costs decreased by 4%. Quarter-over-quarter, cost improvements at Aranzazu and Apoena were sufficient to offset higher costs at Almas, which faced a decrease in grades as anticipated in the mine sequencing plan.
In H1 2025, Cash Cost averaged US$1,147/oz, representing a 10% increase compared to the same period in 2024, the increase was primarily driven by the impact of the copper-to-GEO conversion at Aranzazu and lower production at Apoena, as expected. At constant H1 2024 metal prices, Cash Costs increased by 2%
The consolidated All-in Sustaining Cost (AISC) was US$1,449 per GEO, representing a 9% increase compared to Q2 2024 and a 1% decrease versus Q1 2025, in line with the cash cost trend. When calculated using constant metal prices from Q2 2024, AISC for the quarter would have been US$1,312 per GEO, a decrease of 1%. In H1 2025, AISC was US$1,455, a 11% increase compared to H1 2024. At constant H1 2024 metal prices, AISC increased by 3%.
2.4. Gross Income
| (US$ thousand) | Q2 2025 | Q1 2025 | % | Q2 2024 | % | H1 2025 | H1 2024 | % |
| Net Revenue | 190,436 | 161,804 | 18% | 134,411 | 42% | 352,240 | 266,489 | 32% |
| Cost of goods sold | (86,497) | (83,376) | 4% | (83,103) | 4% | (169,873) | (168,500) | 1% |
| Cost of production | (44,470) | (44,919) | -1% | (36,203) | 23% | (89,389) | (75,062) | 19% |
| Cost of production - Contractors | (17,529) | (15,467) | 13% | (22,356) | -22% | (32,996) | (42,380) | -22% |
| Change in inventory (cash) | (9,550) | (9,126) | 5% | (9,762) | -2% | (18,676) | (20,167) | -7% |
| Depreciation and amortization | (14,948) | (13,864) | 8% | (14,782) | 1% | (28,812) | (30,891) | -7% |
| Gross Profit | 103,939 | 78,428 | 33% | 51,308 | 103% | 182,368 | 97,989 | 86% |
| Gross Margin | 55% | 48% | 6 p.p. | 38% | 1641 p.p. | 52% | 37% | 15 p.p. |
The increase in Net Revenue coupled with the Company’s rigorous cost control – with an increase of 4% on Cost of goods sold compared to the same quarter of 2024 – led to a Gross Profit at the quarter of US$130.9 million in
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

Q2 2025, with a Gross Margin of 55%, compared to the Gross Profit of US$51.3 million in Q2 2024 and US$78.4 million in Q1 2025.
In H1 2025, Gross Profit reached US$182.4 million, higher than US$98.0 million in H1 2024, also explained by 32% increase in net revenue and only 1% at costs of goods sold.
2.5.Operating Expenses
| (US$ thousand) | Q2 2025 | Q1 2025 | % | Q2 2024 | % | H1 2025 | H1 2024 | % |
| Gross Profit | 103,939 | 78,428 | 33% | 51,308 | 103% | 182,367 | 97,989 | 86% |
| Operational Expenses | (12,998) | (11,012) | 18% | (10,482) | 24% | (24,010) | (20,703) | 16% |
| General and administrative expenses | (11,284) | (9,636) | 17% | (7,156) | 58% | (20,920) | (15,014) | 39% |
| Care-and-maintenance expenses | - | - | n.a. | (375) | n.a. | - | (796) | n.a. |
| Exploration expenses | (1,714) | (1,376) | 25% | (2,951) | -42% | (3,090) | (4,893) | -37% |
| Impairment | 0 | 0 | 0% | 0 | - | - | - | 0% |
| Changes in ARO | - | - | 0% | - | n.a. | - | - | 0% |
| Operating income | 90,941 | 67,416 | 35% | 40,826 | 123% | 158,357 | 77,286 | 105% |
Operating Expenses totaled US$13.0 million in the quarter, 18% higher than Q1 2025 and 24% higher than Q2 2024. The result for the quarter was mainly impacted by higher General & Administrative (G&A) expenses, driven by increased professional and consulting fees, as well as audit cost adjustments primarily related to the Company’s U.S. listing. In H1 2025, there was a 16% increase in Operational Expenses due to a 39% increase in G&A, partially offset by a 37% reduction in Exploration Expenses.
Exploration expenses totaled US$1.7 million in Q2 2025, a 25% increase compared to Q1 2025 and 42% reduction from Q2 2024. Exploration activities in the quarter were concentrated in Almas and Minosa. In Matupá, efforts were focused on expanding reserves in regions close to X1, Pé Quente and other strategic areas. In Carajás, exploration work successfully confirmed copper mineralization, significantly expanding the mineral potential of the region. In H1 2025, the reduction of the Q2 2025 partially compensated the higher expenses in Q1 2025, closing the semester with a 37% reduction, in line with the Company’s plan and due to the capitalization of exploration expenses in certain targets.
The Company thus ended Q2 2025 with Operating Income of US$90.9 million, compared to an Operating Income of US$40.8 million in Q2 2024, also higher compared to the Operating Income of Q1 2025 of US$67.4 million, which reflects a positive result of higher gross profit.
2.6. Adjusted EBITDA
| (US$ thousand) | Q2 2025 | Q1 2025 | % | Q2 2024 | % | H1 2025 | H1 2024 | % |
| Operating Income | 90,941 | 67,416 | 35% | 40,826 | 123% | 158,357 | 77,286 | 105% |
| Depreciation and Amortization | 15,283 | 14,063 | 9% | 15,346 | 0% | 29,346 | 31,553 | -7% |
| Ajdusted EBITDA | 106,224 | 81,479 | 30% | 56,172 | 89% | 187,703 | 109,398 | 72% |
| Adjusted EBITDA Margin | 56% | 50% | 5 p.p. | 42% | 14 p.p. | 53% | 41% | 12 p.p. |
Adjusted EBITDA reached a new all-time high of US$106.2 million in Q2 2025, marking the fourth consecutive quarterly record for Aura. The Company’s ongoing commitment to improving asset productivity and maintaining disciplined cost control enabled it to fully capture the benefit of rising metal prices. As a result, Adjusted EBITDA doubled compared to Q2 2024 and grew 30% over Q1 2025.
The year-over-year improvement was primarily driven by strong cost control – only 4% increase - and higher gold and copper prices. This result was also noted on the EBITDA margin gain of 14 p.p. Compared to Q1 2025, the increase in Adjusted EBITDA was supported not only by stronger metal prices and also by a 3% increase in sales volume.
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

In H1 2025, the Company maintained stable Cost of Goods Sold compared to H1 2024. Combined with the positive impact of higher metal prices, this led to an Adjusted EBITDA of US$187.7 million, a 72% increase over the same period last year. As a result, the Adjusted EBITDA margin expanded to 53%, up from 41% in H1 2024.
2.7. Financial Result
| (US$ thousand) | Q2 2025 | Q1 2025 | % | Q2 2024 | % | H1 2025 | H1 2024 | % |
| EBIT | 90,941 | 67,416 | 34.9% | 40,826 | 123% | 158,357 | 77,286 | 105% |
| Financial Expenses | (59,630) | (121,611) | -51.0% | (45,102) | 32% | (181,241) | (79,197) | 129% |
| Accretion expense | (1,134) | (1,666) | -31.9% | (1,573) | -28% | (2,800) | (3,106) | -10% |
| Lease interest expense | (161) | (1,595) | -89.9% | (2,012) | -92% | (1,756) | (4,021) | -56% |
| Interest expense on debts | (6,098) | (5,755) | 6.0% | (4,121) | 48% | (11,853) | (8,338) | 42% |
| Finance cost on post-employment benefit | (747) | (338) | 121.0% | (467) | 60% | (1,085) | (834) | 30% |
| Unrealized gain (loss) on gold hedges | (24,304) | (100,210) | -75.7% | (11,558) | 110% | (124,514) | (33,226) | 275% |
| Realized gain (loss) on gold hedges | (11,703) | (6,036) | 93.9% | - | n.a. | (17,739) | - | n.a. |
| Gain (loss) on other derivative transactions | (1,305) | (1,827) | -28.6% | - | n.a. | (3,132) | - | n.a. |
| Change in liability measures at fair value | (4,025) | (2,359) | 70.6% | (954) | 322% | (6,384) | (3,587) | 78% |
| Foreign exchange (gain) loss | (2,462) | (3,176) | -22.5% | (11,184) | -78% | (5,638) | (13,274) | -58% |
| Derivative fee | - | - | n.a. | (13,522) | n.a. | - | (13,522) | n.a. |
| Loss on settlement of liability with equity instruments | (8,768) | - | n.a. | - | n.a. | (8,768) | - | n.a. |
| Other finance costs | (297) | (430) | -30.9% | (140) | n.a. | (727) | (571) | 27% |
| Interest Income | 1,374 | 1,781 | -22.9% | 429 | 220% | 3,155 | 1,282 | 146% |
| Other gains (losses) | 61 | (754) | n.a. | 1 | n.a. | (693) | (593) | 17% |
| Income/ (Loss) before income taxes | 31,372 | (54,949) | n.a. | (4,275) | n.a. | (23,577) | (2,504) | 842% |
The Company’s Financial Result in Q2 2025 was US$(59.6) million, following on from the US$(121.6) million loss in Q1 2025, impacted by:
| · | Unrealized loss on gold hedges in Q2 2025, arising from mark-to-market (MTM) adjustments related to outstanding gold hedge positions, reflecting increase in gold prices between the start and the end of the quarter, which closed the quarter at US$3,288.57 per Oz, coming from US$2,861.93 per Oz on March 31, 2025. In accordance with IFRS standards, the Company records MTM adjustments at the end of each reporting period for all outstanding derivative positions. |
| · | Realized losses with gold hedges in Q2 2025 were related to cash settlement of outstanding gold collars during the quarter, driven by the expiration of gold collars within the quarter. |
| · | Non-cash loss of US$8.8 million related to the settlement of the Nemesia SARL debt with equity instruments, reflecting the difference between the fair value of the shares at the time when the shares were issued and the carrying amount of the debt acquired in the Bluestone transaction at the closing of the transaction. |
Most of Aura’s outstanding gold collars (225,996 Ozs out of about 234,598 Ozs) are associated with the future production of the Borborema Project and will expire between Jul/2025 and Jun/2028. As previously disclosed, about 80% of the production of the first 3 years of the Borborema Project is hedged at ceiling prices of US$2,400.
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

2.8. Net Income
| (US$ thousand) | Q2 2025 | Q1 2025 | % | Q2 2024 | % | H1 2025 | H1 2024 | % |
| Income/ (Loss) before income taxes | 31,372 | (54,949) | n.a. | (4,275) | n.a. | (23,577) | (2,504) | 841.6% |
| Total taxes | (23,225) | (18,300) | 27% | (21,500) | 8% | (41,525) | (32,488) | 28% |
| Current income tax (expense) | (29,551) | (20,814) | -42% | (14,612) | 102% | (50,365) | (24,755) | 103% |
| Deferred income tax (expense) recovery | 6,326 | 2,514 | -152% | (6,888) | -192% | 8,840 | (7,733) | n.a. |
| Income/(Loss) for the period | 8,147 | (73,249) | n.a. | (25,775) | -132% | (65,102) | (34,992) | n.a. |
| Net Margin | 4% | -45% | n.a. | -19% | -122% | -18% | -13% | n.a. |
| Unrealized loss with derivative gold collars | (24,304) | (100,210) | n.a. | (11,558) | 110% | (124,514) | (33,226) | 275% |
| Gain (loss) on foreign exchange | (2,462) | (3,176) | 22% | (11,184) | -78% | (5,638) | (13,274) | -58% |
| Deferred taxes on non-monetary items | 6,847 | 3,234 | n.a. | (12,447) | -155% | 10,081 | (11,472) | n.a. |
| Loss on settlement of liability with equity instruments | (8,768) | - | n.a. | - | n.a. | (8,768) | - | n.a. |
| Adjusted Net Income | 36,834 | 26,903 | 37% | 9,414 | 291% | 63,738 | 22,980 | 177% |
Net Income in Q2 2025 was US$8.1 million, an increase when compared to a Net Loss of US$(25.8) in Q2 2024 and US$(73.2) in Q1 2025. This improvement vs. Q2 2024 and Q1 2025 was mainly due to the improvement in the Operating Income during Q2 2025. In addition, compared to Q1 2025, there was a decrease in Finance Costs in the quarter, related to a lower unrealized loss on gold hedges in Q2 2025, which resulted from mark-to-market (MTM) adjustments on open hedge positions, driven by increase in gold price between the start and the end of the quarter
In H1 2025, Net Loss reached US$(65.1), also mainly due to mark-to-market (MTM) adjustments on open hedge positions, driven by increase in gold price between the start and the end of the semester.
Adjusted Net Income
As result of increase in the Company’s Operating Income, adjusted net income in Q2 2025 was US$36.8 million in the period, compared to US$9.4 million in Q2 2024, excluding:
| · | Non-cash losses related to gold hedges: US$(24.3) million |
| · | FX losses: US$(2.5) million |
| · | Deferred taxes over non-monetary items US$6.9 million |
| · | Loss on settlement of liability with equity instruments: US$(8.8) million |
Managerial view – Adjusted EBITDA to Adjusted Net Income Q2 2025 Bridge (US$ million)
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

3. Performance of the Operating Units
3.1 Aranzazu
| (US$ thousand) | Q2 2025 | Q1 2025 | % | Q2 2024 | % | H1 2025 | H1 2024 | % |
| Production at Constant Prices (GEO)¹ | 22,281 | 19,017 | 17% | 19,337 | 15% | 41,298 | 39,439 | 5% |
| Production at Current Prices (GEO) | 22,281 | 20,456 | 9% | 24,692 | -10% | 42,737 | 49,693 | -14% |
| Sales (GEO) | 22,290 | 20,456 | 9% | 24,683 | -10% | 42,746 | 49,786 | -14% |
| Cash Cost (US$/GEO) | 1,110 | 1,164 | -5% | 958 | 16% | 1,136 | 942 | 21% |
| AISC (US$/GEO) | 1,514 | 1,545 | -2% | 1,206 | 26% | 1,529 | 1,235 | 24% |
| Net Revenue | 62,508 | 50,262 | 24% | 49,240 | 27% | 112,770 | 93,402 | 21% |
| Cost of goods sold | (31,021) | (30,282) | 2% | (29,266) | 6% | (61,303) | (58,130) | 5% |
| Gross Profit | 31,487 | 19,980 | 58% | 19,974 | 58% | 51,467 | 35,272 | 46% |
| Expenses | (2,310) | (2,483) | -7% | (2,588) | -11% | (4,793) | (5,010) | -4% |
| G&A | (1,516) | (1,774) | -15% | (932) | 63% | (3,290) | (2,244) | 47% |
| Exploration expenses | (794) | (709) | 12% | (1,656) | -52% | (1,503) | (2,766) | -46% |
| EBIT | 29,177 | 17,497 | 67% | 17,386 | 68% | 46,674 | 30,262 | 54% |
| Adjusted EBITDA | 35,684 | 24,387 | 46% | 23,012 | 55% | 60,254 | 41,502 | 45% |
| Financial Result | (4,292) | (606) | 608% | (832) | 416% | (4,898) | (1,675) | 192% |
| Financial expenses | (3,762) | (34) | n.a. | (201) | n.a. | (3,796) | (748) | 407% |
| Other revenue/expenses | (530) | (572) | -7% | (631) | -16% | (1,102) | (927) | 19% |
| EBT | 24,885 | 16,891 | 47% | 16,554 | 50.3% | 41,776 | 28,587 | 46.1% |
| Total taxes | (12,532) | (7,383) | 70% | (6,814) | 84% | (19,915) | (11,230) | 77% |
| Current income tax (expense) | (13,035) | (6,431) | n.a. | (7,796) | 67% | (19,466) | (12,291) | 58% |
| Deferred income tax (expense) recovery | 503 | (952) | n.a. | 982 | -49% | (449) | 1,061 | n.a. |
| Net Income | 12,353 | 9,508 | 30% | 9,740 | 27% | 21,861 | 17,357 | 26% |
Applies the metal sale prices in Aranzazu realized during Q2 2025: Copper price = US$4.39/lb; Gold Price = US$3,293/oz; Silver Price = US$34.27/oz.
In the second quarter of 2025, Aranzazu production reached 22,281 GEO, representing an increase of 9%, at current prices, and 17% at constant prices, when compared to the previous quarter, resulting from higher grades and better recoveries, despite the increase in gold prices which negatively impacted the conversion to GEO. When compared to Q2 2024, production decreased by 14% due to the sharp increase in gold prices between the periods which also impacted GEO conversion. At constant prices, Aranzazu production increased by 15%, also due to higher grades and a recovery improvement.
Aranzazu’s Net Revenue totaled US$62.5 million for Q2 2025, 24% higher than Q1 2025. Net Revenue grew 27% compared to Q2 2024, driven by higher metal prices. In H1 2025, the Net Revenue of Aranzazu reached US$112.8 million, a 21% increase compared to H1 2024.
The Cash Cost was US$1,110/GEO for the quarter, 5% lower than Q1 2025 and 16% higher than Q2 2024. In H1 2025, Cash Cost increased by 21%, with a total of US$1,136/GEO in the semester. Aranzazu`s AISC was US$1,514 in the quarter, representing a 26% increase compared to the same period last year mainly due to differences in metal prices. At constant metal prices, AISC decreased by 3% when compared to Q2 2024. The decrease in AISC versus last year is a result from higher grades and recoveries, in line with planned mine sequencing, partially offset by higher investments in primary development and tailing dams. In H1 2025, the AISC was US$1,248, an increase of 1% compared to the same period in 2024 at same metal prices.
The cost discipline aligned with better productivity drove the Adjusted EBITDA to US$35.7 million in Q2 2025, 46% higher than Q1 2025 and 55% higher than Q2 2024. In H1 2025, Adjusted EBITDA reached US$60.1 million, an increase of 45% over H2 2024. Aranzazu’s Net Income totaled US$12.3 million in Q2 2025, a 27% increase compared to Q2 2024, and US$21.9 million in H1 2024.
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

3.2 Apoena
| (US$ thousand) | Q2 2025 | Q1 2025 | % | Q2 2024 | % | H1 2025 | H1 2024 | % |
| Production (GEO) | 8,219 | 8,876 | -7% | 9,912 | -17% | 17,095 | 22,017 | -22% |
| Sales (GEO) | 8,219 | 9,408 | -13% | 8,258 | 0% | 17,627 | 21,118 | -17% |
| Cash Cost (US$/GEO) | 1,168 | 1,228 | -5% | 1,252 | -7% | 1,200 | 940 | 28% |
| AISC (US$/GEO) | 1,751 | 2,041 | -14% | 1,958 | -11% | 1,906 | 1,500 | 27% |
| Net Revenue | 26,711 | 26,353 | 1% | 18,992 | 41% | 53,064 | 44,999 | 18% |
| Cost of goods sold | (14,270) | (15,104) | -6% | (15,814) | -10% | (29,374) | (31,749) | -7% |
| Gross Profit | 12,441 | 11,249 | 11% | 3,178 | 291% | 23,690 | 13,250 | 79% |
| Expenses | (998) | (1,425) | -30% | (1,150) | -13% | (2,423) | (2,175) | 11% |
| G&A | (936) | (1,301) | -28% | (785) | 19% | (2,237) | (1,427) | 57% |
| Care & maintenance expenses | - | - | n.a. | (243) | n.a. | - | (578) | n.a. |
| Exploration expenses | (62) | (124) | -50% | (122) | -49% | (186) | (170) | 9% |
| EBIT | 11,443 | 9,824 | 16% | 2,028 | 464% | 21,267 | 11,075 | 92% |
| Adjusted EBITDA | 16,151 | 13,516 | 19% | 7,541 | 114% | 29,697 | 23,046 | 29% |
| Financial Result | (1,453) | (6,567) | -78% | (2,708) | -46% | (8,020) | (6,350) | 26% |
| Financial expenses | (1,497) | (6,636) | -77% | (2,798) | -46% | (8,133) | (6,440) | 26% |
| Other revenue/expenses | 44 | 69 | -36% | 90 | n.a. | 113 | 90 | 26% |
| EBT | 9,990 | 3,257 | 207% | (680) | n.a. | 13,247 | 4,725 | 180% |
| Total taxes | (1,211) | 1,342 | n.a. | (2,788) | -57% | 131 | (3,507) | n.a. |
| Current income tax (expense) | (862) | (663) | 30% | (986) | -13% | (1,525) | (1,882) | -19% |
| Deferred income tax (expense) recovery | (349) | 2,005 | n.a. | (1,802) | -81% | 1,656 | (1,625) | n.a. |
| Net Income | 8,779 | 4,599 | 91% | (3,468) | n.a. | 13,378 | 1,218 | 998% |
In the second quarter of 2025, Apoena production was in line with expectations and at 8,219 GEO, a 17% decrease from Q2 2024, primarily due to the mine’s investment phase focusing on opening the Nosde Phase III pit, and lower ore grades as result. Compared to Q1 2025, production decreased 7%, consistent with the mine plan, as lower-grade ore was mined. Despite this decrease, production remains in line with the Company’ full year 2025 expectations. Pre-stripping activities are underway while we push back the Nosde and Lavrinha mines to regain access to higher volume and higher grades by end of 2026 at Nosde Phase III.
Apoena’s Net Revenue totaled US$26.7 million for Q2 2025, in line with Q1 2025. Compared to Q2 2024, the significant increase of 41% mainly due to the higher gold price, offsetting the lower production. In H1 2025, Apoena reached a Net Revenue of US$53.1 million, an increase of 18% compared to H1 2024.
The Cash Cost was US$1,168/GEO for the quarter, a 5% decrease versus Q1 2025 and 7% lower than Q2 2024. Apoena’s AISC was US$ 1,751/GEO in Q2 2025, a drop of 14% versus Q1 2025 and a decrease of 11% compared to Q2 2024, mainly driven by increase in the proportion of costs capitalized as expansion capex, related to the Nosde pit. In H1 2025, the AISC was US$1,906, an increase of 27% compared to the same period in 2024, which was expected considering the mine sequencing. Despite the ongoing investments in expansion, which have temporarily impacted production, the focus on cost control combined with higher gold prices drove Adjusted EBITDA to US$16.1 million in Q2 2025, up 114% compared to Q2 2024 and 19% higher than Q1 2025. In H1 2025, Adjusted EBITDA reached US$29.7 million, an increase of 29% over H2 2024.
Apoena’s net income totaled US$8.8 million in Q2 2025, a 91% increase over Q1 2025 and a significant improvement from the net loss of US$3.5 million recorded in Q2 2024 resulting in a net income of US$13.4 million in the H1 2025, an increase of 998% when compared to H1 2024.
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

3.3 Minosa
| (US$ thousand) | Q2 2025 | Q1 2025 | % | Q2 2024 | % | H1 2025 | H1 2024 | % |
| Production (GEO) | 18,039 | 17,654 | 2% | 19,142 | -6% | 35,693 | 38,328 | -7% |
| Sales (GEO) | 17,836 | 17,526 | 2% | 19,738 | -10% | 35,362 | 38,966 | -9% |
| Cash Cost (US$/GEO) | 1,178 | 1,149 | 3% | 1,094 | 8% | 1,164 | 1,140 | 2% |
| AISC (US$/GEO) | 1,292 | 1,249 | 3% | 1,159 | 12% | 1,271 | 1,223 | 4% |
| Net Revenue | 55,776 | 48,062 | 16% | 41,962 | 33% | 103,838 | 79,609 | 30% |
| Cost of goods sold | (22,056) | (21,476) | 3% | (23,171) | -5% | (43,532) | (47,213) | -8% |
| Gross Profit | 33,720 | 26,586 | 27% | 18,791 | 79% | 60,306 | 32,396 | 86% |
| Expenses | (1,430) | (1,371) | 4% | (1,242) | 15% | (2,801) | (2,392) | 17% |
| G&A | (1,166) | (1,135) | 3% | (1,242) | -6% | (2,301) | (2,391) | -4% |
| Exploration expenses | (264) | (236) | 12% | - | n.a. | (500) | (1) | n.a. |
| EBIT | 32,290 | 25,215 | 28% | 17,549 | 84% | 57,505 | 30,004 | 92% |
| Adjusted EBITDA | 33,533 | 26,856 | 25% | 19,120 | 75% | 60,646 | 32,796 | 85% |
| Financial Result | (1,189) | (1,556) | -24% | (2,064) | -42% | (2,745) | (4,426) | -38% |
| Financial expenses | (1,442) | (1,312) | 10% | (1,661) | -13% | (2,754) | (3,836) | -28% |
| Other revenue/expenses | 253 | (244) | n.a. | (403) | n.a. | 9 | (590) | n.a. |
| EBT | 31,101 | 23,659 | 31% | 15,485 | 101% | 54,760 | 25,578 | 114% |
| Total taxes | (7,425) | (6,218) | 19% | (4,948) | 50% | (13,643) | (8,743) | 56% |
| Current income tax (expense) | (7,774) | (6,611) | 18% | (4,936) | 57% | (14,385) | (8,508) | 69% |
| Deferred income tax (expense) recovery | 349 | 393 | -11% | (12) | n.a. | 742 | (235) | n.a. |
| Net Income | 23,676 | 17,441 | 36% | 10,537 | 125% | 41,117 | 16,835 | 144% |
In the second quarter of 2025, Minosa produced 18,039 GEO, up 2% when compared to the previous quarter, resulting from higher grades processed during the quarter due to mine sequencing. When compared to the same quarter last year, production decreased by 6%, primarily due to lower stacking volumes in Q2 2025, impacted by higher rainfall levels during the period and was in line with the Company’s expectations.
Net Revenue totaled US$55.8 million in Q2 2025, up 16% from Q1 2025, due to higher gold prices and sales volumes, while in comparison to Q2 2024 it grew 33%, mainly due to the increase in the price of gold over the period. In H1 2025, Net Revenue reached US$103.8 million, 30% higher than H1 2024.
The Cash Cost was US$1,178/GEO in Q2 2025, 3% higher than Q1 2025 and 8% higher than Q2 2024, due to lower production as result of the lower stacking volumes. In H1 2025, Cash Cost was US$1,164/GEO, 2% increase compared to H1 2024, due to lower grades and slightly higher mine costs. Considering these effects, All-In Sustaining Cost totaled US$1,292/GEO for the quarter, an increase of 3% compared to Q1 2025 and 12% compared to Q2 2024.
The Adjusted EBITDA totaled US$33.5 million in Q2 2025, up 84% versus Q2 2024, reflecting the positive impact of a strong cost control and higher gold prices, while it was up 25% versus Q1 2025. In H1 2025, Adjusted EBITDA reached US$60.4 million, an increase of 84%. Minosa’s Net Income totaled US$23.7 million for the quarter, up 125% in Q2 2024 and 36% in Q1 2025, resulting in a Net income of US$ 41.1 million in the H1 2025.
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

3.4 Almas
| (US$ thousand) | Q2 2025 | Q1 2025 | % | Q2 2024 | % | H1 2025 | H1 2024 | % |
| Production (GEO) | 12,917 | 13,101 | -1% | 10,580 | 22% | 26,018 | 22,475 | 16% |
| Sales (GEO) | 12,917 | 13,101 | -1% | 10,580 | 22% | 26,018 | 22,475 | 16% |
| Cash Cost (US$/GEO) | 1,167 | 1,069 | 9% | 1,203 | -3% | 1,118 | 1,176 | -5% |
| AISC (US$/GEO) | 1,364 | 1,195 | 14% | 1,434 | -5% | 1,279 | 1,428 | -10% |
| Net Revenue | 41,751 | 37,127 | 12% | 24,217 | 72% | 78,878 | 48,479 | 63% |
| Cost of goods sold | (18,036) | (16,514) | 9% | (14,851) | 21% | (34,550) | (31,407) | 10% |
| Gross Profit | 23,715 | 20,613 | 15% | 9,366 | 153% | 44,328 | 17,072 | 160% |
| Expenses | (1,898) | (1,040) | 83% | (930) | 104% | (2,938) | (1,997) | 47% |
| G&A | (1,475) | (803) | n.a. | (930) | 59% | (2,278) | (1,997) | 14% |
| Exploration expenses | (423) | (237) | 78% | - | n.a. | (660) | - | n.a. |
| EBIT | 21,817 | 19,573 | 11% | 8,436 | 159% | 41,390 | 15,075 | 175% |
| Adjusted EBITDA | 24,709 | 22,205 | 11% | 11,019 | 124% | 47,136 | 21,062 | 124% |
| Financial Result | (4,468) | (3,746) | 19% | (3,391) | 32% | (8,214) | (4,506) | 82% |
| Financial expenses | (4,448) | (3,740) | 19% | (3,394) | 31% | (8,188) | (4,487) | 82% |
| Other revenue/expenses | (20) | (6) | n.a. | 3 | -767% | (26) | (19) | n.a. |
| EBT | 17,349 | 15,827 | 10% | 5,045 | 244% | 33,176 | 10,569 | 214% |
| Total taxes | (1,226) | (4,757) | -74% | (6,404) | -81% | (5,983) | (8,317) | n.a. |
| Current income tax (expense) | (7,101) | (5,998) | 18% | (894) | 694% | (13,099) | (2,074) | 532% |
| Deferred income tax (expense) recovery | 5,875 | 1,241 | 373% | (5,510) | n.a. | 7,116 | (6,243) | n.a. |
| Net Income | 16,123 | 11,070 | n.a. | (1,359) | -1286% | 27,193 | 2,252 | 1108% |
During Q2 2025, Almas produced 12,917 GEO, consistent with Q1 2025 (13,101 GEO). Compared to Q2 2024, production increased by 22%, driven by the plant expansion and improved mine performance, reflecting the benefits of the transition to the new mine contractor during Q2 2024.
Net Revenue was US$41.7 million in Q2 2025, 72% higher than Q2 2024, impacted by higher sales and metal prices. Versus Q1 2025, Net Revenue was up 12%, mainly driven by a significant increase in the price of gold. In H1 2025, Net Revenue was US$78.9 million, a 63% increase compared to H1 2024, resulting from the higher volumes sold and prices increased.
The Cash Cost was US$1,167/GEO in Q2 2025, 3% lower than Q2 2024, due to the higher production volumes which offset the higher strip ratio, and lower grades. Compared to Q1 2025, The Cash Cost increased 9%, resulting from a grade reduction already expected by the mine segmentation. Almas’ AISC was US$1,364/GEO for the quarter, 5% lower compared to Q2 2024, primarily driven by improved operational performance as discussed before along with lower Capex during the quarter. Versus Q1 2025, AISC increased 14%. In H1 2025, the AISC was US$1,364, a decrease of 5% compared to the same period in 2024, mainly as result of the successful change in mine contractor during Q2 2024.
Adjusted EBITDA totaled US$24.7 million in Q2 2025, more than doubled of the Q2 2024 result, driven by plant expansion, improved operating performance, higher volumes processed and an increase in the price of gold. Compared with the Q1 2025, the Adjusted EBITDA was 11% higher than Q1 2025, explained by higher gold prices in the period. In H1 2025, Adjusted EBITDA was US$47.1 million, 123% higher than H1 2024.
Almas’ Net Income was US$16.1 million in Q2 2025, compared to US$11.1 in Q1 2025, also higher than the Loss of Q2 2024 of US$(1.4) million.
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

3.5 Borborema
| (US$ thousand) | Q2 2025 | H1 2025 |
| Production (GEO) | 2,577 | 2,577 |
| Sales (GEO) | 1,190 | 1,190 |
| Cash Cost (US$/GEO) | 936 | 936 |
| AISC (US$/GEO) | 1,441 | 1,441 |
| Net Revenue | 3,690 | 3,690 |
| Cost of goods sold | (1,114) | (1,114) |
| Gross Profit | 2,576 | 2,576 |
| Expenses | (378) | (378) |
| G&A | (378) | (378) |
| Exploration expenses | - | - |
| EBIT | 2,198 | 2,198 |
| Adjusted EBITDA | 2,084 | 2,084 |
| Financial Result | (4,971) | (4,971) |
| Financial expenses | (4,982) | (4,982) |
| Other revenue/expenses | 11 | 11 |
| EBT | (2,773) | (2,773) |
| Total taxes | (309) | (309) |
| Current income tax (expense) | - | - |
| Deferred income tax (expense) recovery | (309) | (309) |
| Net Income | (3,082) | (3,082) |
The Borborema production in Q2 2025 totaled 2,577 GEO following the project’s first gold pour. The Borborema Project has begun the ramp-up phase on schedule and to budget. The Company expects to achieve commercial production by the third quarter of 2025. Borborema is set to become one of Aura’s flagship assets, expected to produce the second-highest annual gold volumes from among the five operations. Constructed in just 19 months and with no lost-time incidents, the project reinforces Aura’s commitment to developing lean, scalable, efficient operations.
On August 30, 2023, Aura released a Feasibility Study indicating an expected production of 748,000 ounces of gold over an 11.3-year LOM, with the potential for even greater production from a deposit with over 2,000,000 ounces of Measured and Indicated Mineral Resources. The original Feasibility Study for the Borborema project, using a gold price of US$1,712 per ounce, projected total gold production of 812,000 ounces, with an NPV of US$182 million and IRR of 21.9%. The leveraged IRR with 50% debt was calculated at 40.8%, with an operating payback of 3.2 years. Sensitivity analysis using a gold price of US$2,600 per ounce, while maintaining all the other assumptions of the Feasibility Study, shows the NPV increasing to US$537 million, while the IRR rises to 41.8%, the leveraged IRR reaches 81.4% and the payback period improves to 1.7 years.
4. Cash Flow
| (US$ mil) | Q2 2025 | Q1 2025 | % | Q2 2024 | % | H1 2025 | H1 2024 | % |
| Adjusted EBITDA | 106,224 | 81,479 | 30% | 56,172 | 89% | 187,703 | 109,398 | 72% |
| (+) Exploration Expenses | 1,714 | 1,376 | 25% | 2,951 | -42% | 3,090 | 4,893 | -37% |
| (-) Sustaining Capex | (15,151) | (10,174) | 49% | (6,740) | 125% | (28,342) | (17,200) | 65% |
| (+/-) ∆ Working Capital and Others | 7,024 | (17,996) | n.a. | (8,499) | -183% | (12,020) | (23,499) | n.a. |
| (-) Income Taxes Paid | (22,570) | (16,874) | 34% | (2,136) | 957% | (39,444) | (11,434) | 245% |
| (-) Lease Payments | (5,122) | (4,239) | 21% | (4,273) | 20% | (9,361) | (8,680) | 8% |
| (-) Realized Losses on Gold Hedges | (11,699) | (6,036) | 94% | - | n.a. | (17,759) | - | n.a. |
| Recurring Free Cash Flow | 60,420 | 27,536 | 119% | 37,475 | 61% | 83,867 | 53,478 | 57% |
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

Recurring Free Cash Flow for the quarter was US$60.4 million, 119% higher than Q1 2025 and 61% higher than Q2 2024. Compared to Q1 2025, the result is mainly explained by a lower consumption of the working capital and compared to Q2 2024, an additional effect of lower exploration expenses. Both periods were also impacted by an important increase in Adjusted EBITDA, driven especially by higher metal prices. In H1 2025, Free Cash Flow was US$83.9 million, 57% higher than H1 2024.
The chart below shows the change in cash position for the three months ending June 30, 2025, from a management perspective:
Changes to the Cash Position Q1 2025 vs. Q2 2025 – Managerial View (US$ Million)

Changes to the Cash Position Q4 2024 vs. Q2 2025 – Managerial View (US$ Million)

Note: Adjusted Capex includes Exploration and Expansion Capex.
5. Investment
The Company’s consolidated Capex for Q2 2025 totaled US$50.3 million. The main investment headlines for the quarter include:
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

| · | Expansion of Capex: US$36 million, concentrated mainly on Project Borborema, where US$18.5 million was invested. The remaining expansion-related investment was mainly in Apoena and Almas, with around US$6.0 million each invested respectively. |
| · | Maintenance Capex: US$11.8 million, of which US$6.8 million was allocated to Aranzazu, US$2.2 million to Apoena, and US$1.1 million to Almas and US$1.3 million to Minosa. |
| · | Exploration Capex: US$2.2 million, allocated to exploration activities. Aranzazu led investment with US$1.0 million, followed by Apoena with US$0.9 million. Other exploration projects totaled US$1.1 million. |
6. Gross and Net Debt
Total gross debt (short and long-term portion) was US$453,893 at the end of Q2 2025, a decrease when compared to $467,687 at the end of Q1 2025. This decrease was mainly driven by the reduction of US$13,794 due to the settlement of Nemesia SARL debt.
The Company’s cash position remains comfortable, closing out the year at US$167.9 million, despite investment in the expansion of our operations, annual income tax payments and dividend payments. Net Debt was US$280,560 by Q2 2025, due to capex of US$50,327, mostly related to payments related to the construction of the Borborema Project and dividends payment of US$29,811. These impacts were partially offset by the higher cash generation during the quarter
Net Debt Breakdown
| (US$ thousand) | Q2 2025 | Q1 2025 | % | Q2 2024 | % |
| Short term debts | 78,786 | 100,853 | -22% | 98,004 | -20% |
| Long term debts | 375,107 | 366,834 | 2% | 236,413 | 59% |
| Gross debt | 453,893 | 467,687 | -3% | 334,417 | 36% |
| Cash | 167,938 | 198,066 | -15% | 191,963 | -13% |
| Restric Cash | - | - | n.a. | - | n.a. |
| Almas Debentures Swap | 5,395 | 2,320 | 133% | 45 | 11889% |
| Net Debt | 280,560 | 271,941 | 3% | 142,499 | 97% |
| Net Debt/LTM EBITDA | 0.81x | 0.92x | -0.12x | 0.79x | 0.02x |
The table below shows the debt amortization timeline:
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

Debt Amortization Timeline (US$ thousand)

7. Guidance vs. Actual1
The Company is on track to achieve the 2025 Guidance, including Production, Cash Cost, All-in Sustaining Cost (AISC) and CAPEX, as shown in the results below:
| 'Gold equivalent ounces production ('000 GEO) - 2025 | |||||
| Lower Bound | Upper Bound | H1 2025 A | H1 2025 at Guidance metal prices |
% | |
| Aranzazu | 64 | 73 | 36 | 36 | 55% - 49% |
| Apoena | 29 | 32 | 17 | 17 | 59% - 53% |
| Minosa | 88 | 97 | 43 | 48 | 49% - 44% |
| Almas | 51 | 58 | 26 | 26 | 51% - 45% |
| Total ex-Borborema | 233 | 260 | 122 | 127 | 52% - 47% |
| Borborema | 33 | 40 | 3 | 3 | 8% - 6% |
| Total | 266 | 300 | 124 | 129 | 47% - 41% |
1 Key Factors:
The Company’s future profitability, operating cash flow and financial position will be directly related to prevailing gold and copper prices. Key factors that influence the price of gold and copper include, among others, the supply and demand for gold and copper, the relative strength of currencies (especially the US dollar) and macroe7conomic factors, such as current and future expectations for inflation and interest rates. Management believes that the economic environment in the short and medium term should remain relatively favorable with respect to commodity prices, albeit with continued volatility.
To reduce the risks associated with commodity prices and currency volatility, the Company will continue to assess and deploy hedging programs. For more information on this subject, please refer to the Reference Form.
Other key factors influencing profitability and operating cash flows are: production levels (affected by grades, ore quantities, process recoveries, labor, country stability and availability of facilities and equipment); production and processing costs (impacted by production levels, prices and the use of key consumables, labor, inflation and exchange rates), and other factors.
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

| 'Cash Cost per equivalent ounce of gold produced - 2025 | |||||
| Lower Bound | Upper Bound | H1 2025 A | H1 2025 at Guidance metal prices | % | |
| Minosa | 1,108 | 1,219 | 1,178 | 1,178 | 106% - 97% |
| Apoena | 1,258 | 1,384 | 1,168 | 1,168 | 93% - 84% |
| Aranzazu | 1,029 | 1,132 | 1,110 | 950 | 108% - 98% |
| Almas | 1,013 | 1,114 | 1,167 | 1,167 | 115% - 105% |
| Borborema | 1,084 | 1,232 | 936 | 936 | 86% - 76% |
| Total | 1,078 | 1,191 | 1,146 | 1,080 | 96% - 106% |
| AISC per equivalent ounce of gold produced - 2025 | |||||
| Lower Bound | Upper Bound | H1 2025 A | H1 2025 at Guidance metal prices | % | |
| Minosa | 1,263 | 1,364 | 1,279 | 1,279 | 101% - 94% |
| Apoena | 2,425 | 2,619 | 1,906 | 1,906 | 79% - 73% |
| Aranzazu | 1,348 | 1,455 | 1,532 | 1,295 | 114% - 105% |
| Almas | 1,113 | 1,202 | 1,279 | 1,279 | 115% - 106% |
| Borborema | 1,113 | 1,304 | 1,186 | 1,186 | 107% - 91% |
| Total | 1,374 | 1,492 | 1,456 | 1,367 | 98% - 106% |
| 'Capex (US$ million) - 2025 | ||||
| Low - 2025 | High - 2025 | H1 2025 A | % | |
| Sustaining | 40 | 47 | 22 | 55% - 47% |
| Exploration | 10 | 13 | 6 | 60% - 45% |
| New projects + Expansion | 99 | 106 | 74 | 75% - 70% |
| Total | 149 | 167 | 102 | 61% - 68% |
9. Shareholder Information
As of June 30, 2025, the Company had the following outstanding: 74,529,362 Common Shares, 1,500,992 stock options, and 189,795 deferred share units.
In subsequent events, during July 2025, the Company issued 8,100,510 common shares. Following these transactions, the Company has a total of 82,629,872 common shares outstanding as of the date of this PRESS RELEASE date.
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

11. Attachments
11.1 Financial Statements
| (US$ thousand) | Q2 2025 | Q1 2025 | % | Q2 2024 | % | H1 2025 | H1 2024 | % |
| Net revenue | 190,436 | 161,804 | 18% | 134,411 | 42% | 352,240 | 266,489 | 32% |
| Cost of goods sold | (86,497) | (83,376) | 4% | (83,103) | 4% | (169,873) | (168,500) | 1% |
| Gross profit | 103,939 | 78,428 | 33% | 51,308 | 103% | 182,367 | 97,989 | 86% |
| General and administrative expenses | (11,284) | (9,636) | 17% | (7,156) | 58% | (20,920) | (25,038) | -184% |
| Exploration expenses | (1,714) | (1,376) | 25% | (2,951) | -42% | (3,090) | (4,893) | -37% |
| Operating income | 90,941 | 67,416 | 35% | 40,826 | 123% | 158,357 | 77,286 | 105% |
| Financial expenses | (59,630) | (121,611) | -51% | (45,102) | 32% | 181,241 | (79,197) | -329% |
| Other income (expenses) | 61 | (754) | -108% | 1 | 6000% | (693) | (593) | 17% |
| Profit before income taxes | 31,372 | (54,949) | -157% | (4,275) | -834% | (23,577) | (2,504) | 842% |
| Current income tax (expense) | (29,551) | (20,814) | 42% | (14,612) | 102% | (50,365) | (24,755) | 103% |
| Deferred income tax (expense) recovery | 6,326 | 2,514 | 152% | (6,888) | -192% | 8,840 | (7,733) | -214% |
| Total taxes | (23,225) | (18,300) | 27% | (21,500) | 8% | (41,525) | (32,488) | 28% |
| Profit/(loss) for the period | 8,147 | (73,249) | -111% | (25,775) | -132% | (65,102) | (34,992) | 86% |
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

11.2 Balance Sheet
| (US$ million) | Q2 2025 | Q1 2025 | Q2 2024 |
| ASSETS | |||
| Current | |||
| Cash and cash equivalents | 167,938 | 198,066 | 191,963 |
| Accounts receivables | 4,826 | 15,666 | 1,876 |
| Value added taxes and other recoverable taxes | 21,292 | 23,637 | 35,928 |
| Inventories | 80,034 | 67,876 | 54,968 |
| Derivative financial instrument | 5,395 | - | 0.045 |
| Other receivables and assets | 21,556 | 2,831 | 13,831 |
| Total current assets | 301,045 | 333,556 | 315,495 |
| Non-current assets | |||
| Value added taxes and other recoverable taxes | 46,329 | 43,832 | 15,778 |
| Inventories | 23,025 | 19,265 | 11,738 |
| Other receivables and assets | 4,319 | 3,741 | 3,457 |
| Property, plant and equipment | 762,566 | 720,466 | 516,742 |
| Deferred income tax assets | 28,639 | 18,131 | 18,772 |
| Total non-current assets | 864,878 | 805,435 | 566,487 |
| Total assets | 1,165.923 | 1,138.991 | 881.982 |
| LIABILITIES | |||
| Current | |||
| Trade and other payables | 111,156 | 103,793 | 79,537 |
| Derivative financial instruments | 26,654 | 26,578 | - |
| Loans and Debentures | 78,786 | 100,853 | 98,004 |
| Liability measured at fair value | 485 | 3,829 | 2,869 |
| Current income tax liabilities | 28,507 | 31,379 | 8,752 |
| Current portion of other liabilities | 14,939 | 14,711 | 1,3910 |
| Liabilities directly associated with assets classified as held for sale | 2,757 | 2,757 | - |
| Total current liabilities | 267,649 | 2,839 | 203,072 |
| Non-current liabilities | |||
| Loans and debentures | 375,107 | 366,834 | 236,413 |
| Liability measured at fair value | 17,689 | 15,537 | 21,041 |
| Derivative financial instruments | 222,901 | 201,688 | 75,982 |
| Deferred income tax liabilities | 35,925 | 32,052 | 1,1180 |
| Provision for mine closure and restoration | 6,447 | 62,212 | 51,343 |
| Other provisions | 28,467 | 27,872 | 13,633 |
| Other liabilities | 13,951 | 9,031 | 17,023 |
| Total non-current liabilities | 75,851 | 715,226 | 430,702 |
| SHAREHOLDERS' EQUITY | |||
| Share capital | 633,271 | 6,105 | 608,977 |
| Contributed surplus | 55,669 | 55,669 | 55,494 |
| Accumulated other comprehensive income | (4,812) | (3,607) | 2,222 |
| Accumulated losses | (544,364) | (5,227) | (418,485) |
| Total equity | 139,764 | 13,986 | 248,208 |
| Total liabilities and equity | 1,165,923 | 1,138,991 | 881,982 |
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

11.3 Cash Flow Statement
| (US$ thousand) | Q2 2025 | Q1 2025 | Q2 2024 | H1 2025 | H2 2025 |
| Cash flows from operating activities | |||||
| (Loss) for the period | 8,147 | (73,249) | (25,775) | (65,102) | (34,992) |
| Items not affecting cash | 82,263 | 155,569 | 69,846 | 237,832 | 132,015 |
| Changes in working capital | 3,372 | (14,135) | 638 | (10,764) | (17,133) |
| Taxes paid | (22,570) | (16,874) | (2,136) | (39,444) | (11,434) |
| Other assets and liabilities | 8,653 | (10,082) | 11,038 | (1,429) | 11,007 |
| Net cash generated by operating activities | 79,864 | 41,229 | 53,612 | 121,093 | 79,464 |
| Cash flows from investing activities | |||||
| Purchase of property, plant and equipment, and other investments | (50,325) | (51,725) | (23,575) | (102,051) | (53,278) |
| Acquision of investment - Big River Gold | - | - | - | - | - |
| Acquisition of investment - Altamira Gold Corp | (439) | - | - | - | - |
| Net cash generated by investing activities | (50,764) | (52,969) | (22,261) | (102,051) | (53,278) |
| Cash flows from financing activities | |||||
| Proceeds received from debts | - | - | 19,000 | - | 34,000 |
| Derivatives | - | - | (13,522) | - | (10,654) |
| Payments of dividends | (29,811) | (18,333) | (25,339) | (48,144) | (25,339) |
| Acquisition of treasury shares | - | (1,200) | (3,458) | (1,200) | (3,458) |
| Proceeds and (payments) from exercise of stock options | - | - | - | - | - |
| Repayment of short term loans | (9,147) | (11,455) | (9,520) | (20,603) | (23,312) |
| Repayment of other liabilities | (1) | (981) | - | (982) | (825) |
| Principal payments of lease liabilities | (5,122) | (4,239) | (4,273) | (9,361) | (8,680) |
| Interest paid on debts | (13,397) | (7,775) | (4,096) | (21,171) | (17,698) |
| Proceeds from liability (NSR agreement) | (852) | (742) | (1,136) | (1,594) | (1,210) |
| Net cash generated by financing activities | (55,748) | (44,724) | (42,244) | (100,472) | (57,176) |
| Increase (decrease) in cash and cash equivalents | (26,648) | (56,465) | (10,893) | (81,429) | (30,891) |
| Effect of foreign exchange gain (loss) on cash equivalents | (3,480) | 1,635 | (11,210) | (1,845) | (14,442) |
| Cash and cash equivalents, beginning of the period | 495,931 | 270,188 | 214,067 | 270,189 | 237,295 |
| Per balance sheet at the end of comparative period | 465,804 | 215,359 | 191,962 | 186,915 | 191,962 |
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

11.4 Non-GAAP Performance Measures
Set out below are reconciliations for certain non-GAAP financial measures (including non-GAAP ratios) utilized by the Company in this Earnings Release: Adjusted EBITDA; Adjusted net Income, cash operating costs per gold equivalent ounce sold; AISCs; Net Debt; and Adjusted EBITDA Margin, which are non-GAAP financial measures. These non-GAAP measures do not have any standardized meaning within IFRS and therefore may not be comparable to similar measures presented by other companies. The Company believes that these measures provide investors with additional information which is useful in evaluating the Company’s performance and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.
A. Reconciliation from income for the quarter to Adjusted EBITDA:
(US$ thousand)
| (US$ thousand) | Q2 2025 | Q2 2024 | H1 2025 | H1 2024 |
| (Loss)/Profit for the period | 8,147 | (25,775) | (65,102) | (34,992) |
| Current tax | 29,551 | 14,612 | 50,365 | 24,755 |
| Deferred tax | (6,326) | 6,888 | (8,840) | 7,733 |
| Finance expense | 59,630 | 45,102 | 181,241 | 79,197 |
| Other (expense) income | (61) | (1) | 693 | 593 |
| Depletion and amortization | 15,283 | 15,346 | 29,346 | 32,090 |
| Adjusted EBITDA | 106,224 | 56,172 | 187,703 | 109,376 |
B. Reconciliation from the consolidated financial statements to cash operating costs per gold equivalent ounce sold:
(US$ thousand)
| (US$ thousand) | Q2 2025 | Q2 2024 | H1 2025 | H1 2024 |
| Cost of goods sold | (86,497) | (83,102) | (169,873) | (168,499) |
| Depletion and amortization | 14,948 | 14,782 | 28,812 | 30,891 |
| Subtotal | (71,549) | (68,320) | (141,061) | (137,608) |
| Gold Equivalent Ounces sold | 62,452 | 63,258 | 122,943 | 132,344 |
| Cash costs per gold equivalent ounce sold | 1,146 | 1,080 | 1,147 | 1,040 |
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

C. Reconciliation from the consolidated financial statements to all in sustaining costs per gold equivalent ounce sold:
(US$ thousand)
| (US$ thousand) | Q2 2025 | Q2 2024 | H1 2025 | H1 2024 |
| Cost of goods sold | (86,497) | (83,103) | (169,873) | (168,500) |
| Depletion and amortization | 14,948 | 14,782 | 28,812 | 30,891 |
| Subtotal | (71,549) | (68,320) | (141,061) | (137,608) |
| Adjusted capex | 13,993 | 8,774 | 26,044 | 21,189 |
| General and Administrative Expenses | 3,746 | 2,631 | 7,317 | 5,456 |
| Lease Payments | 1,226 | 4,273 | 4,449 | 8,680 |
| Subtotal | (64,003) | (61,416) | (126,721) | (123,472) |
| Gold Equivalent Ounces sold (in thousands) | 62,452 | 63,258 | 122,943 | 132,344 |
| All In Sustaining costs per ounce sold equivalent ounce sold | 1,449 | 1,328 | 1,455 | 1,307 |
D. Reconciliation from the consolidated financial statements to realized average gold price per ounce sold, net2:
(US$ thousand)
| (US$ thousand) | Q2 2025 | Q2 2024 | H1 2025 | H1 2024 |
| Gold Revenue, net of Sales Taxes | 127,928 | 85,171 | 239,470 | 173,087 |
| Ounces of gold sold | 40,162 | 38,575 | 80,197 | 82,559 |
| Realized average gold price per ounce sold, net | 3,185 | 2,208 | 2,986 | 2,097 |
E. Net Debt:
(US$ thousand)
| (US$ thousand) | Q2 2025 | Q2 2024 | H1 2025 | H1 2024 |
| Loans and debentures (current) | 78,786 | 98,004 | 78,786 | 98,004 |
| Loans and debentures (non-current) | 375,107 | 236,413 | 375,107 | 236,413 |
| Derivative Financial Instrument (Swap – Aura Almas (Itaú Bank) | (5,395) | (45) | (5,395) | (45) |
| Cash and Cash Equivalents | (167,938) | (191,963) | (167,938) | (191,963) |
| Net Debt | 280,560 | 142,409 | 280,560 | 142,409 |
(1) Derivative Financial Instrument: only includes the swap related to the Aura Almas Debenture.
F. Adjusted EBITDA Margin3 (Adjusted EBITDA/Revenues):
(US$ thousand)
| (US$ thousand) | Q2 2025 | Q2 2024 | H1 2025 | H1 2024 |
| Net Revenue | 190,436 | 134,411 | 352,240 | 266,489 |
| Adjusted EBITDA | 106,224 | 55,797 | 187,703 | 108,602 |
| Adjusted EBITDA Margin (Adjusted EBITDA/Revenues) | 56% | 42% | 53% | 41% |
2 Realized average gold price per ounce sold, net is a non-GAAP financial measure with no standardized meaning under IFRS, and therefore may not be comparable to similar measures presented by other issuers. For further information and detailed reconciliations to the most directly comparable IFRS measures, see Section 17: Non-GAAP Performance Measures in this PRESS RELEASE.
3 Adjusted EBITDA Margin is a non-GAAP financial measure with no standardized meaning under IFRS, and therefore may not be comparable to similar measures presented by other issuers. For further information and detailed reconciliations to the most directly comparable IFRS measures, see Section 17: Non-GAAP Performance Measures in this PRESS RELEASE.
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

G. Adjusted Net Income
(US$ thousand)
| (US$ thousand) | Q2 2025 | Q2 2024 | H1 2025 | H1 2024 |
| Income/(Loss) for the period | 8,147 | (25,775) | (65,102) | (34,992) |
| Foreign exchange gain (loss) | (2,462) | (11,184) | (5,638) | (13,274) |
| Gain (loss) on derivative transactions | (24,304) | (11,558) | (124,514) | (33,226) |
| Loss on settlement of liability with equity instruments | (8,768) | - | (8,768) | - |
| Deffered taxes over non-monetary items | 6,847 | (12,447) | 10,081 | (11,472) |
| Adjusted Net Income | 36,834 | 9,414 | 63,737 | 22,980 |
Qualifield Person
Farshid Ghazanfari, P.Geo., Mineral Resources and Geology Director for Aura Minerals Inc., has reviewed and approved the scientific and technical information contained within this Press Release and serves as the Qualified Person as defined in NI 43-101 and S-K 1300. All NI 43-101 technical reports related to properties material to Aura are available on SEDAR+ at sedarplus.ca and all S-K 1300 technical report summaries related to properties material to Aura are available on www.sec.gov.
About Aura 360° Mining
Aura is focused on mining in complete terms – thinking holistically about how its business impacts and benefits every one of our stakeholders: our company, our shareholders, our employees, and the countries and communities we serve. We call this 360° Mining.
Aura is a company focused on the development and operation of gold and base metal projects in the Americas. The Company's five operating assets include the Minosa gold mine in Honduras; the Almas, Apoena, and Borborema gold mines in Brazil; and the Aranzazu copper, gold, and silver mine in Mexico. Additionally, the Company owns Era Dorada, a gold project in Guatemala; Tolda Fria, a gold project in Colombia; and three projects in Brazil: Matupá, which is under development; São Francisco, which is in care and maintenance; and the Carajás copper project in the Carajás region, in the exploration phase.
For more information, please contact:
Investor Relations
ri@auraminerals.com
www.auraminerals.com
CAUTIONARY NOTES AND ADDITIONAL INFORMATION
This Press Release, and the documents incorporated by reference herein, contain certain “forward-looking information” within the meaning of applicable Canadian securities laws and “forward-looking statements” within the meaning of applicable United States securities laws (together, “forward-looking information”). Forward-looking information relates to future events or future performance of the Company and reflect the Company’s current estimates, predictions, expectations or beliefs regarding future events and include, without limitation, statements with respect to: expected production from, and the further potential of the Company’s properties; the ability of the Company to achieve its long-term outlook and the anticipated timing and results thereof (including the guidance set forth herein); the ability to lower costs and increase production; the economic viability of a project; strategic plans, including the Company’s plans with respect to its properties; the amount of mineral reserves and mineral resources; probable mineral reserves; indicated
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

mineral reserves; inferred mineral reserves; the potential conversion of indicated mineral resources into mineral reserves; the amount of future production over any period; capital expenditures and mine production costs; the outcome of mine permitting; other required permitting; information with respect to the future price of minerals; expected cash costs and AISCs; the Company’s ability expand exploration on its properties; the Company’s ability to obtain assay results; the Company’s exploration and development programs; estimated future expenses; exploration and development capital requirements; the amount of mining costs; cash operating costs; operating costs; expected grades and ounces of metals and minerals; expected processing recoveries; expected time frames; prices of metals and minerals; LOM of certain projects; expectations of gold hedging programs; the implementation of cultural initiatives; expected increases to fleet capacities; non-cash losses translating into cash losses; the ability to continue to finance planned growth; access to additional debt; and the repayment of outstanding balances on revolving credit facilities. Often, but not always, forward-looking information may be identified by the use of words such as “expects”, “anticipates”, “plans”, “projects”, “forecasts”, “estimates”, “assumes”, “intends”, “strategy”, “goals”, “objectives” or variations thereof or stating that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative of any of these terms and similar expressions.
Forward-looking information is necessarily based upon a number of estimates and assumptions that, while considered reasonable by the Company, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Forward-looking information in this Press Release is based upon, without limitation, the following estimates and assumptions: the ability of the Company to successfully achieve business objectives; the presence of and continuity of metals at the Company’s projects at modeled grades; gold and copper price volatility; the capacities of various machinery and equipment; the availability of personnel, machinery and equipment at estimated prices; exchange rates; metals and minerals sales prices; cash costs and AISCs; the Company’s ability to expand operations; the Company’s ability to obtain assay results; appropriate discount rates; tax rates and royalty rates applicable to the mining operations; cash operating costs and other financial metrics; anticipated mining losses and dilution; metals recovery rates; reasonable contingency requirements; the Company’s expected ability to develop adequate infrastructure and that the cost of doing so will be reasonable; the Company’s expected ability to develop its projects including financing such projects; and receipt of regulatory approvals on acceptable terms.
Known and unknown risks, uncertainties and other factors, many of which are beyond the Company’s ability to predict or control, could cause actual results to differ materially from those contained in the forward-looking information. Specific reference is made to the Company’s most recent AIF for a discussion of some of the factors underlying forward-looking information, which include, without limitation: gold and copper or certain other commodity price volatility; changes in debt and equity markets; the uncertainties involved in obtaining and interpreting geological data; increases in costs; environmental compliance and changes in environmental legislation and regulation; interest rate and exchange rate fluctuations; general economic conditions; political stability; and other risks involved in the mineral exploration and development industry. Readers are cautioned that the foregoing list of factors is not exhaustive of the factors that may affect the forward-looking information.
All forward-looking information herein is qualified by this cautionary statement. Accordingly, readers should not place undue reliance on forward-looking information. The Company undertakes no obligation to update publicly or otherwise revise any forward-looking information whether as a result of new information or future events or otherwise, except as may be required by law. If the Company does update any forward-looking information, no inference should be drawn that it will make additional updates with respect to such or other forward-looking information.
Note to United States Investors Concerning Estimates of Indicated and Inferred Mineral Resources
This Press Release refers to estimated mineral reserves and mineral resources, including inferred mineral resources, indicated mineral resources, measured mineral resources, probable mineral reserves and
AURA Q2 2025 | H1 2025 EARNINGS RESULTS

proven mineral reserves. The mineral reserve estimates were prepared in accordance with Subpart 1300 of Regulation S-K, or “S-K 1300,” using geostatistical and/or classical methods, plus economic and mining parameters appropriate to the deposit. The estimates include mining dilution and mining recovery. Mining dilution and recovery factors vary with specific reserve sources and are influenced by several factors including deposit type, deposit shape and mining methods. The estimate of mineral reserves and mineral resources may be materially affected by environmental, permitting, legal, marketing, or other relevant issues relating to exploration results, mineral resources, mineral reserves and exploration targets is based on supporting documentation prepared by qualified persons. Technical report summaries for each of our material mining operations have been prepared by qualified persons and have been filed as exhibits to our registration statement on Form F-1 filed with the U.S. Securities and Exchange Commission, or the “SEC”. The SEC maintains an Internet site that contains reports, proxy and information statements, and other information regarding issuers that file electronically with the SEC, including our technical report summaries. The SEC’s website is http://www.sec.gov.
Additional Information
Additional information relating to the Company, is available on SEDAR+ at www.sedarplus.com and on EDGAR at www.sec.gov/.
AURA Q2 2025 | H1 2025 EARNINGS RESULTS
EXHIBIT 99.2

To find, mine and deliver the planet’s most important and essential minerals that enable the world and humankind to create, innovate, and prosper
Management’s Discussion and Analysis For the three and six months ended on June 30, 2025
Dated as of August 5, 2025 |
| Management’s Discussion and Analysis
|
|
Summary
|
| 1. BACKGROUND AND CORE BUSINESS | 4 |
| 2. SECOND QUARTER 2025 and FIRST HALF 2025 SUMMARY | 5 |
| 3. EMPLOYEES, ENVIRONMENT AND SOCIAL | 9 |
| 3.2. COMMUNITIES | 14 |
| 3.3 CORPORATE GOVERNANCE | 17 |
| 4. OPERATIONAL HIGHLIGHTS | 18 |
| 5. FINANCIAL HIGHLIGHTS | 18 |
| 6. OUTLOOK AND KEY FACTORS | 22 |
| 7. REVIEW OF MINING OPERATIONS AND EXPLORATION | 24 |
| 8. RESULTS OF OPERATIONS | 40 |
| 9. SUMMARY OF QUARTERLY AND ANNUAL RESULTS | 44 |
| 10. LIQUIDITY AND CAPITAL RESOURCES | 44 |
| 11. CONTRACTUAL OBLIGATIONS | 46 |
| 12. RELATED PARTY TRANSACTIONS | 46 |
| 13. PROPOSED TRANSACTIONS | 47 |
| 14. CRITICAL ACCOUNTING ESTIMATES | 47 |
| 15. FINANCIAL INSTRUMENTS AND OTHER INSTRUMENTS | 48 |
| 16. DISCLOSURE CONTROLS AND INTERNAL CONTROLS OVER FINANCIAL REPORTING | 49 |
| 17. SUBSEQUENT EVENTS | 50 |
| 18. NON-GAAP PERFORMANCE MEASURES | 51 |
| 19. RISK FACTORS | 55 |
| 20. DISCLOSURE OF SHARE DATA | 55 |
| 21. CAUTIONARY NOTES AND ADDITIONAL INFORMATION | 55 |
| 22. TECHNICAL DISCLOSURE | 57 |
1
| Management’s Discussion and Analysis
|
The management’s discussion and analysis (“MD&A”) has been prepared as at the date written on the cover page and provides information that management believes is relevant to assessing and understanding the financial condition of Aura Minerals Inc. (the “Company”, “Aura Minerals” or “Aura”) and the results of operations and cash flows for the three and six months ended June 30, 2025.
This MD&A should be read in conjunction with the Company’s quarterly condensed interim Financial Statements for three and six months ended June 30, 2025, and the related notes thereto (the “Financial Statements”) which have been prepared in accordance with IAS 34 Interim Financial Reporting as issued by the International Accounting Standards Board (collectively, “IFRS”). In addition, this MD&A should be read in conjunction with both Annual audited consolidated financial statements for the year ended December 31, 2024 and the related annual MD&A and the Company’s most recent annual information form (“AIF”) as well as other information relating to Aura Minerals as filed on the Company’s profile on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov.
Except for mineral prices and per-share amounts, which are presented in United States dollars, and unless otherwise noted, references herein to “US$” or and “$” are to thousands of United States dollars. References to “C$” are to thousands of Canadian dollars. References to “BRL” or “R$” are to Brazilian reais and references to MXN are to Mexican pesos. Tables and dollar figures in the body of the document are expressed in United States dollars, except where otherwise noted. The rate of exchange for one United States dollar into Canadian dollars on June 30, 2025 was US$1.00 = C$1.3643 and the rate of exchange for one Brazilian real into U.S. dollars on June 30, 2025 was US$1.00 = BRL 5.4571, as reported by the Bank of Canada and Central Bank of Brazil, respectively.
The Company uses certain non-GAAP financial measures (and non-GAAP ratios) in this MD&A, which the Company believes, when supplementing measures determined in accordance with IFRS, provide investors with an improved ability to evaluate the underlying performance of the Company. The below non-GAAP financial measures do not have any standardized meaning prescribed under IFRS, and therefore may not be comparable to similar measures employed by other companies. These measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The non-GAAP financial measures, non-GAAP ratios and supplementary financial measures included in this MD&A are:
| · | Adjusted EBITDA (“Adjusted EBITDA”); |
| · | Cash operating costs per gold equivalent ounce sold (“cash cost”); |
| · | All-in sustaining costs per gold equivalent ounce sold (“AISCs”); |
| · | Realized average gold price per ounce sold, net; |
| · | Net debt (“Net debt”); |
| · | Adjusted EBITDA margin (“Adjusted EBITDA margin”); |
| · | Adjusted Net Income (“Adjusted Net Income”). |
Further information and reconciliations associated with the certain non-GAAP financial measures used by the Company in this MD&A, including non-GAAP financial measures above, can be found in Section 18: Non-GAAP Performance Measures.
Statements herein are subject to the risks and uncertainties identified in Section 19: Risk Factors and Section 21: Cautionary Note regarding Forward-Looking Information of this MD&A.
All mineral resource and mineral reserve estimates included in the documents referenced in this MD&A have been prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and in accordance with h Subpart 1300 of Regulation S-K (S-K 1300). Readers are encouraged to review the AIF and F-1 forms and full text of the Company’s other continuous disclosure documents. These documents are available on SEDAR+ and supply further information on the Company’s compliance with NI 43-101 requirements as well as EDGAR+ and supply further information on the Company’s compliance with S-K 1300 requirements. See Section 22: Technical Disclosure of this MD&A for further information.
Additional information relating to the Company, including the AIF, is available on the Company’s profile on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov/edgar.
2
| Management’s Discussion and Analysis
|
1. BACKGROUND AND CORE BUSINESS
Aura is a high-growth, multi-jurisdiction, gold and copper producer focused on the operation and development of gold and base metal projects in the Americas. The common shares of the Company (the “Common Share”) are listed on NASDAQ under the symbol “AUGO” and on the TSX under the symbol “ORA”, and the Brazilian Depositary Receipts (“BDRs”) of the Company, each representing three Common Shares, are listed on the B3 - Brasil, Bolsa Balcão under the symbol “AURA33”.
Aura owns operating gold and copper projects in Brazil, Mexico and Honduras, and owns other projects that are at different stages of development in Brazil, Colombia and Guatemala. The Company’s main objective is to grow its business responsibly, sustainably, and profitably while also adhering to the highest environmental and safety standards, aligned with the Aura 360° Mining Culture.
Aura has a history of sector leading dividends, returning approximately US$248 million to shareholders between dividends and buybacks since 2021.
The Company has the following mineral properties:
Assets in Operations and Ramp Up Stages:
Aranzazu – an underground copper mine operation, producing gold as a by-product, located within the Municipality of Concepcion del Oro in the State of Zacatecas, Mexico, near its northern border with the State of Coahuila. The property is situated in a rugged mountainous area and is accessed either from the city of Zacatecas, located 250 km to the southwest, or from the city of Saltillo, located 112 km to the northeast in the State of Coahuila.
Apoena – a mine complex located in the southwest of Mato Grosso state, near Pontes e Lacerda in Brazil which consists of the following gold deposits: the Lavrinha open pit mine (“Lavrinha”), the Ernesto open pit mine (“Ernesto”), the Japonês open pit mine, the Nosde open pit mine, and the near mine open pit prospects Japonês Oeste, Pombinhas and several other potential prospects.
Minosa – an open pit heap leach gold mine located in the highlands of western Honduras, in the municipality of La Union, Department of Copan, approximately 150 km southwest of the city of San Pedro Sula.
Almas – an open pit gold operation located in the state of Tocantins, Brazil, that consists of three deposits (Paiol, Vira Saia and Cata Funda) and several exploration targets, including Nova Prata/Espinheiro, Jacobina and Morro do Carneiro, a total area of 101,000 hectares of minerals rights.
Borborema Project (“Borborema”) - A greenfield open pit gold mine, located in the municipality of Currais Novos, Rio Grande do Norte state, in the northeast of Brazil, the Borborema project was built on time and on budget in just 19 months with zero Lost Time Incidents. Following the completion of construction, in March 28, 2025, the project entered the ramp-up phase to start commercial production by the end of Q3 2025. Aura completed a Feasibility Study in August 2023 which indicated anticipated production of 748,000 ounces of gold over an 11.3-year mine life, with possibilities for even greater output. The project also showcases a strong mineral reserve base, with probable mineral reserves of 812,000 oz gold, and an extensive mineral resource profile with strong growth potential that consists of 63.7 Mt at average grade of 1.01 g/t for 2,077 koz of indicated mineral resources and 10.9 Mt at average grade of 1.13 g/t for 393 koz of inferred mineral resources (see Section 22: Technical Disclosure of this MD&A for further information on the NI 43-101 and S-K 1300 compliant technical reports). Initial measures have already been undertaken to start obtaining permits to move the road, and upon its successful relocation, there exists the potential to convert part of the 1,265 koz of indicated mineral resources into mineral reserves (exclusive of the current mineral reserves), depending on future set of modifying factors, such as gold price, exchange rate and others . Aura holds 100% of the shares of Borborema Inc., which indirectly owns Borborema, and envisions the project to be economically strong and also a testament to its strategic growth in Brazil's mining landscape.
3
| Management’s Discussion and Analysis
|
Projects in Development and Exploration Stages:
Matupá Project (“Matupá”) – a gold project located in the northern part of the state of Mato Grosso, Brazil consists of three deposits: X1 (gold), Serrinhas (gold), and Guarantã Ridge (base metal). The main focus for exploration was X1, a 350-meter-long deposit which resulted in a mineral resource and a NI 43-101 and S-K 1300 compliant technical reports. See Section 22: Technical Disclosure of this MD&A for further information on the NI 43-101 and S-K 1300 compliant technical reports. The Matupá Project’s claims consist of multiple exploration targets, including a copper porphyry target, in a total area of 62,500 hectares of mineral rights. Two additional exploration prospects acquired in 2024 are being advanced nearby, which includes, the Pé Quente Project, located 34 km from X1 with a historical in situ resource estimate of 257Koz (6.26 million tonnes @ 1.28 g/t Au) and the Pezão Project, located 50km from X1 with a historical potential in situ resource of 370Koz . The Pé Quente Project offers significant potential opportunity to expand resources in the Alta Floresta Gold Province. Spanning 19,593 hectares, the project features gold mineralization linked to intrusion-related deposits controlled by regional structural trends. This follows an extensive 2024–2025 drilling campaign totaling 16,942.41 meters across 96 drillholes on four key targets: Nilva, Rubens, Goiano, and Barba mineralized zones. The program confirmed strong gold mineralization continuity across all targets, with strike lengths of up to 440 meters, down-dip extensions of up to 350 meters, and mineralized zones with true thicknesses reaching up to 90 meters in the Nilva target.
Era Dorada Project (previously known as “Cerro Blanco”) is a near-surface gold deposit located in Jutiapa, Guatemala.
The Company filed an S-K 1300 compliant Preliminary Economic Assessment (“PEA”) for Era Dorada Project on June 9, 2025, with an Indicated Mineral Resources of 1.9 million ounces of gold, assuming 6.35 million tonnes at 9.31 grams per tonne. The total production was approximately 1.4 million ounces of gold over a 17 year Life of Mine (“LOM”), and an average production of 91k ounces of gold for the first 4 years. The total initial implementation CAPEX is estimated at US$264 million with a payback of approximately 3.5 years after the beginning of the operation. Aura is currently working on a full Feasibility Study, expected to be completed by early 2026.
Aura Carajás (“Serra da Estrela Project”) – a permitted exploration target of 9,805 hectares, located in the State of Para, Brazil, Carajás area. The area includes iron oxide copper gold (“IOCG”) mineralization targets along a 6 km strike with copper surface anomalies of up to 500ppm Cu and has nine historical exploration holes totaling 2,552 meters with positive intercepts showing mineralization. Aura acquired exploration rights and options to test for continuity and economic grades in the target area. Since originally acquiring the option in February 2023, Aura completed approximately 22,000 meters of diamond drilling in 65 drill holes during 2023–2024. These drilling efforts extended the mineralized strike from the original 6 km to 8 km, with semi-massive sulfide zones exceeding 1% copper within the overall mineralized envelope. While no new exploration has been conducted since December 2024, Aura plans to drill approximately 10 kilometers across the project in the second half of 2025. This next phase of work is designed to advance the project toward a maiden resource estimate.
Other Projects and Mines:
Tolda Fria Gold Project (“Tolda Fria”) – a gold project located in Caldas State, Colombia. The project has a total of 6,624 hectares in mineral rights and the Company is generating potential targets through early-stage exploration. The project is under care and maintenance.
São Francisco Gold Mine (“São Francisco”) – is an open pit heap leach gold mine located in the southwest of the state of Mato Grosso, Brazil, approximately 560 km west of Cuiaba, the state capital. Currently, the mine is under care and maintenance and held for sale.
2. SECOND QUARTER 2025 and FIRST HALF 2025 SUMMARY
Q2 2025 Financial and Operational Highlights:
Total production in Q2 2025 reached 64,033 gold equivalent ounces (“GEO”), 7% higher than Q1 2025 and in line compared to the same period last year at current metal prices. At constant metal prices, production increased by 9% when compared to both Q1 2025 and Q2 2024. The Company remains on track to meet its 2025 guidance of 266,000 to 300,000 GEO. During the quarter, Aura commenced operations at Borborema, anticipated to be one of the Company’s largest and lowest cash cost operations. In the quarter, Borborema’s preliminary production totaled 2,577 GEO, following the project’s first gold pour. The project was completed on schedule, within 19 months, and on budget, and Aura expects to declare Borborema
4
| Management’s Discussion and Analysis
|
commercial production by the end of Q3 2025. In H1 2025, production was 124,120 GEO an increase when compared to the result of H1 2024 of 122,680 GEO, at constant prices. Compared to the public guidance for 2025, this total production represents 47% of the low proposed guidance and 41% of the high proposed guidance, reinforcing the Company's confidence in meeting the 2025 production guidance, since Borborema is still in the ramp up phase.
The paragraphs below detail Q2 2025 production performance by each operating asset:
| · | Aranzazu: Production reached 22,281 GEO, representing a 9% increase compared to the previous quarter, resulting from higher grades and better recoveries, despite the increase in gold prices which negatively impacted the conversion to GEO. When compared to Q2 2024, production decreased by 10% due to the sharp increase in gold prices between the periods which also impacted GEO conversion. At constant prices, Aranzazu production increased by 17% when compared to Q1 2025 and 15% when compared to Q2 2024, also due to higher grades. In H1 2025, production was 41,298 GEO, 5% above H1 2024 at constant prices. |
| · | Minosa: Production totaled 18,039 GEO, up 2% when compared to the previous quarter, resulting from higher grades processed during the quarter due to mine sequencing. When compared to the same quarter last year, production decreased by 6% and was in line with the Company’s expectations. In H1 2025, production was 35,345 GEO, 9% below H1 2024. |
| · | Almas: production reached 12,917 GEO consistent with Q1 2025 (13,101 GEO). Compared to Q2 2024, production increased 22%, driven by higher ore throughput and improved mine performance, reflecting the benefits of the plant expansion and transition to the new mine contractor during Q2 2024. In H1 2025, 26,018 GEO, 16% above H1 2024. |
| · | Apoena: Production was in line with expectations at 8,219 GEO, a 17% decrease from Q2 2024, and 7% from Q1 2025, consistent with the mine plan due to accessing lower grades. Despite this decrease, production remains on track with the Company`s full year 2025 guidance. Pre-stripping is underway at Nosde and Lavrinha to regain access to higher grade ore at Nosde Phase III by late 2026. H1 2025, production was 22% lower than H1 2024. |
| · | Borborema: Production totaled 2,577 GEO following the mine’s first gold pour. Borborema remains on track to achieve commercial production by the end of Q3 2025. |
| · | Sales volumes was 62,452 in GEO, a decrease of 1% in Q2 2025 from Q2 2024 and increased by 3% when compared to the previous quarter. This quarter’s result was in line with Aura’s expectation, reflecting Apoena mine’s investment phase and lower ore grades and also due to lower sales volumes at Aranzazu, considering the negative impact of the copper to gold conversion (despite total copper sales of 16,815 Klb, a 30% increase compared to Q2 2024 and 23% higher than Q1 2025) and Minosa, all offset by the production from Borborema and higher sales volumes at Almas. |
| · | Net Revenues reached a record high of US$190,436 in Q2 2025, representing an increase of 42% compared to Q2 2024 and an increase of 18% when compared to Q1 2025, mainly due to higher gold price. In H1 2025, revenues reached US$352,240, an increase of 32% compared to the same period of 2024. |
| o | Average net realized gold sale prices increased by 14% in Q2 2025 compared to Q1 2025, with an average of US$3,185/oz in the quarter. Compared to Q2 2024, average net realized gold sale prices increased 44% (US$2,208). In H1 2025, average net realized gold sale prices reached US$2,986, a 42% increase when compared to H1 2024. |
| o | Average realized copper sale prices increased 5% compared to Q1 2025, with an average of US$4.46/lb in the quarter, and were in line with the same period in 2024. In H1 2025, average copper sale prices reached US$4.36, a 5% increase when compared to H1 2024. |
| · | Adjusted EBITDA1 reached another record high of US$106,224 in Q2 2025, marking the fourth consecutive quarterly record reported by Aura. The increase was driven by higher gold prices. When compared to Q2 2024 , Adjusted EBITDA reached a 90% increase. |
1 Adjusted EBITDA is a non-GAAP financial measure with no standardized meaning under IFRS, and therefore may not be comparable to similar measures presented by other issuers. For further information and detailed reconciliations to the most directly comparable IFRS measures, see Section 18: Non-GAAP Performance Measures in this MD&A.
5
| Management’s Discussion and Analysis
|
| · | AISC2 for Q2 2025 was US$1,449/GEO, a decrease by 1% when compared to Q1 2025 (US$1,461/GEO), in line with the Company’s expectations. At constant Q2 2024 metal prices, AISC would have been US$1,312 in the quarter. |
| o | For additional details no AISC, see Section 5: Financial Highlights |
| · | The Company's Net Debt reached $280,560 by Q2 2025, due to capex of US$50,327, mostly related to deferred payments related to the construction of the Borborema Proj ect, dividends of US$29,811 million, annual income taxes paid of US$29,551 and reduction of US$13,794 in gross debt due to the settlement of Nemesia SARL debt related to the Bluestone acquisition. The net debt-to-last 12 months Adjusted EBITDA ratio reduced to 0.8x at the end of Q2 2025, from 0.9x at the end of Q1 2025. |
Borborema Ramp-Up
As of the date of this MD&A, the Borborema Project (“Borborema”) started its ramp-up phase on schedule and on budget, with the mine and plant currently in operation. Borborema is poised to become a cornerstone asset for Aura, anticipated to deliver the second-highest annual gold production among the Company’s five operating mines. Built in just 19 months with zero lost time incidents, the project exemplifies Aura’s commitment to developing simple, scalable, and efficient operations.
It also sets a benchmark in ESG performance, incorporating renewable energy sources and utilizing grey water from the local municipality. The mine continues to follow a strong ramp-up trajectory, supported by robust economic fundamentals, including an after-tax IRR of 41.8% (unleveraged) and 81.4% with 50% leverage, based on a gold price of US$2,600 per ounce. These returns do not yet reflect the upside potential from future reserve growth, particularly following the planned road relocation.
Borborema production in Q2 2025 totaled 2,577 GEO following the project’s first gold pour. Aura believes that Borborema remains on track to declare commercial production by the end of Q3 2025.
Acquisition of MSG (Mineração Serra Grande Gold) Mine in Goiás, Brazil
In June 2025, Aura announced a Transaction between AngloGold Ashanti and a wholly-owned subsidiary of Aura that have entered into a Share Purchase Agreement (“SPA”), which Aura will acquire from AngloGold all of the issued and outstanding securities of Mineração Serra Grande S.A. (“MSG”), owner of the MSG gold mine located in Crixás, in the state of Goiás, Brazil.
In consideration for the acquisition of MSG, Aura will pay to AngloGold: (i) an upfront cash consideration of US$76 million on closing subject to certain working capital adjustments as at the closing date; plus (ii) deferred consideration payments equivalent to a 3% net smelter returns participation over the currently identified Mineral Resource of MSG (inclusive of the Mineral Reserve) payable quarterly. The Transaction excludes certain current subsidiaries of MSG, which hold assets that do not form part of MSG’s mining operations or Mineral Resources and Mineral Reserves. These subsidiaries will be spun off from MSG prior to the closing of the Transaction. The Transaction is subject to the fulfilment of certain conditions precedent.
The closing of the Transaction is expected to happen by Q3 2025, and no later than Q4 2025. Please see the press release dated June 2, 2025 for additional information of the MSG Gold Mine acquisition.
Preliminary Economic Assessment for the Era Dorada Project
In June 2025, Aura filed a Preliminary Economic Assessment (“PEA”) for the Company’s wholly owned Era Dorada Project (previously known as the “Cerro Blanco Project”), in the United States in accordance with S-K 1300 and NI 43.101.
The PEA indicated Mineral Resources of 1.9 million ounces of gold, assuming 6.35 million tonnes at 9.31 grams per tonne. The total production of approximately 1.4 million ounces of gold over a 17 year Life of Mine (“LOM”), and with average production of 91k ounces of gold for the first 4 years. Regarding CAPEX, the PEA presented a total initial implementation capex of approximately US$264 million with a payback in approximately 3.5 years after the beginning of the operation. Please see the press release dated June 9, 2025 for additional information of the PEA.
2 AISC is a non-GAAP financial measure with no standardized meaning under IFRS, and therefore may not be comparable to similar measures presented by other issuers. For further information and detailed reconciliations to the most directly comparable IFRS measures, see Section 18: Non-GAAP Performance Measures in this MD&A.
6
| Management’s Discussion and Analysis
|
U.S. Public Offering
In July 2025, Aura concluded its U.S. Initial Public Offering (“IPO”) of 8,100,510 common shares, raising around US$196 million in gross proceeds based on the public offering price of US$24.25 per share. The common shares were listed on the Nasdaq Global Select Market under the symbol “AUGO” and began trading on July 16, 2025. In connection with the offering, Aura granted to the underwriters a 30-day option to purchase up to an additional 1,215,077 common shares at the public offering price, less underwriting discounts and commissions.
The U.S. listing is part of Aura’s strategy to unlock value for our shareholders, improve liquidity of its common shares, as well as strengthen and diversify its shareholder base through broader access to global capital markets.
Aura Minerals Exercises Options to Acquire 100% of the Pé Quente and Carajás Projects
Aura has exercised its options to acquire 100% ownership of the Pé Quente and Carajás Projects (formerly known as “Serra da Estrela”) in Brazil, as previously announced in press releases dated February 27, 2023 and May 22, 2024. These transactions reinforce Aura’s commitment to growing its resource base and exploration and development pipeline across key jurisdictions in the Americas.
| · | Pé Quente Project |
| o | 100% ownership secured; |
| o | 16,942m of drilling completed confirming mineralization across four targets; |
| o | Continuity confirmed with strike lengths up to 440m and down-dip extents up to 350m in the Nilva target; |
| o | Preliminary Meturlligcal testing planned for second semester of 2025 to support potential resource and life of mine expansion for the Matupá Project, located within a 50km radius. |
| · | Aura Carajás Project |
| o | Final US$3M payment completed to fully acquire the project; |
| o | Approximately 10,000 meters of drilling planned at Carajás in H2 2025 to support advancement; toward a maiden resource in Serra da Estrela target. |
Investment in Altamira Gold Corp. through a Private Placement
In July 2025, Aura entered into a subscription agreement with Altamira Gold Corp. (“Altamira”) pursuant to which it acquired, in a non-brokered private placement, 6,000,000 units of Altamira (“Units”) at a price of C$0.10 per Unit for an aggregate purchase price of C$600,000. Each Unit consists of one common share (each, a “Share”) and one-half of one common share purchase warrant of Altamira. Each Warrant is exercisable to acquire one Share of Altamira at an exercise price of C$0.15 per Share until June 30, 2027.
Prior to entering into the Subscription Agreement, Aura held 24,000,000 Shares and 24,000,000 Warrants, as announced in November 2023, representing approximately 11.3% of the issued and outstanding Shares on a non-diluted basis and approximately 20.3% of the issued and outstanding Shares on a fully diluted basis. Immediately upon the closing of the Private Placement, Aura holds 30,000,000 Shares and 27,000,000 Warrants, representing approximately 11.3% of the issued and outstanding Shares on a non-diluted basis and approximately 19.5% of the issued and outstanding Shares on a fully diluted basis. Aura acquired the Units directly from Altamira in the Private Placement and not through the facilities of any stock exchange or other marketplace.
Aura acquired the Units for investment purposes given the exploration potential of Altamira. Please see the press release dated July 3, 2025 for additional information of the subscription agreement with Altamira.
7
| Management’s Discussion and Analysis
|
Annual General Meeting of Shareholders Resolutions
| · | Election of Directors: It was resolved that Paulo de Brito, Stephen Keith, Bruno Mauad, Pedro Turqueto, Richmond Fenn, and Paulo de Brito Filho, be appointed directors of the Company to hold office until the close of the next annual meeting of shareholders or until their successors are duly elected or appointed or if earlier, their death, resignation or removal. |
2024 Sustainability Report Highlights
| · | Achieved the Great Place to Work Certification in all countries of operation. |
| · | Zero lost-time accidents during the construction of Borborema and only one lost-time accident among all projects and operations in 2023 and 2024. |
| · | 55% of Aura’s purchases were made from local suppliers, strengthening relationships with the community. |
| · | Investment of R$ 6.1 million in economic and social development programs. |
3. EMPLOYEES, ENVIRONMENT AND SOCIAL
In the second quarter of 2025, Aura Minerals continued to strengthen its ESG strategy by advancing inclusive, educational, and environmental initiatives across its operations.
The Company participated in the Expo Minera Nordeste 2025, where it presented the immersive experience "Como minerar de forma sustentável” (How to Mine Sustainably), highlighting topics such as revegetation of the Caatinga biome and responsible water use. The company also partnered with a local organization to distribute native seedlings, reinforcing its commitment to community engagement and environmental education.
In Brazil’s Northeast region, the Borborema Project launched the “Sementes do Saber” (Seeds of Knowledge) initiative, a social action focused on adult literacy in the municipality of Currais Novos- RN. This effort aims to expand educational opportunities and foster greater inclusion by offering basic reading and writing education to members of the local community. Meanwhile, at the Almas operation in Tocantins, the Company unveiled a Soil Remineralization Project during the state’s largest agricultural fair, Agrotins 2025. The initiative transforms by-products from the beneficiation process into agricultural inputs, promoting circular economy practices and enhancing synergies between mining and agriculture.
Still in Almas, the Company held its first-ever Solidarity Race, which gathered 250 participants and collected 500 kg of food to support families in vulnerable situations. More than a sporting event, the initiative symbolized Aura’s deep connection with the local community and its commitment to social responsibility. The action also reflected the values of the Aura 360 culture—caring for people, supporting local development, and building a better future together.
Aura was also recognized for its positive regional impact. The Apoena unit received the “Prêmio Destaque Empresarial” (Business Excellence Award) during the “Fórum da Indústria” (Industry Forum) in Cáceres - MT, granted by FIEMT and local industry unions. The award acknowledged Aura’s contributions to regional development, job creation, local supplier engagement, and its ongoing commitment to responsible operations.
In Honduras, the Minosa operation celebrated International Women in Mining Day with the launch of VETA Feminine, a program designed to empower women in mining by creating new professional development opportunities and increasing female representation in technical and leadership roles. The initiative reflects Aura’s broader commitment to equity and inclusion across its operations, with more than 70 women - both direct and indirect employees - expected to take part in this important step toward greater representation in the industry.
8
| Management’s Discussion and Analysis
|
As part of its support for water conservation and gender-focused community initiatives, Aura sponsored the third edition of the “Mulheres das Águas” (Women of the Waters) event in Natividade - TO. The event, which brought together over 600 participants, offered lectures, workshops, and health services, and featured a keynote address by Aura’s community and sustainability leadership on the role of women in environmental stewardship.
The Company also reinforced its culture of continuous improvement through the INOVA program, which encourages innovation and operational efficiency among employees. In the first edition of 2025, held at the Borborema Project unit, 27 projects were submitted. The winning proposal, “Melhoria Chute Finos da Britagem,” (Improvement of the Fine Ore Crusher) redesigned a section of the ore crushing system to improve safety and reduce unplanned stoppages, an example of how simple, employee-driven solutions can generate significant impact on productivity and workplace conditions.
These initiatives reaffirm Aura Minerals’ ongoing commitment to building strong, inclusive, and sustainable communities, while integrating innovation and responsibility into every aspect of its business.
Safety
The Company maintained a strong safety record with zero lost time incidents (“LTIs”) across all operations and projects during Q2 2025. Aura has now achieved 12 consecutive months without LTIs and recorded only one LTI over the last two years across all sites including the construction of Borborema Project (“Borborema”), underscoring the strength of its safety culture and commitment to protecting people.
Borborema, our newest commercial operational unit, reached a major safety milestone, celebrating 1,000 days without a lost time incident - equivalent to more than 4 million work hours - reflecting the maturity and engagement of the site’s workforce.
During the first half of 2025, the critical risk bowtie analyses were completed at the Aranzazu, Apoena, and Almas operations, while development progressed at the Borborema and Minosa sites, with completion expected in the next quarter. Once finalized, the Company will define key performance indicators (“KPIs”) for the management of these risks, aiming to prevent high-severity incidents through systematic control verification and continuous improvement.
In April, Aura marked both World Health Day and the World Day for Safety and Health at Work with the global campaign “Nossa prioridade é cuidar de você” (Our Priority is Taking Care of You). All offices and operational sites held dedicated safety meetings (“DDS”) to reflect on the importance of health and safety, during which Aura’s “Life-Saving Rules” were reinforced, core principles that guide the Company’s daily efforts to create a safer, more humane, and conscious work environment.
Aranzazu
During the second quarter of 2025, Aranzazu recorded over 21,000 Man-Hours in Training. The unit continued with its behavioral-focused quality plan, conducting nearly one thousand engagements throughout the Mining Unit. During this period, the Health, Safety, and Environment Fair was held, an event aimed at consolidating a culture based on caring for people and the environment. The event was attended by more than 700 employees and contractors, as well as 52 supplier companies. No LTI were recorded during this second period. Specific events that did occur were addressed systematically, with a focus on lessons learned.
The 3rd Aura Aranzazu Health and Safety Fair (Feria de la Seguridad y Salud) marked a significant milestone in strengthening the culture of care, prevention, and well-being among employees and contractors at the site. Over the course of three days, the event offered an immersive experience through dynamic activities, cultural performances, emergency simulations, and technical training sessions covering key topics such as underground mine ventilation, respiratory protection, environmental regulations, and hazardous materials management. The fair also included moments of integration and recognition, such as a Talent Show and an inspiring panel on the role of women in mining, featuring participants from various companies across the sector. The active involvement of everyone underscored the collective commitment to a safer, healthier, and more inclusive workplace. This fair has become a strategic initiative to raise awareness, educate, and motivate the entire workforce, directly contributing to the sustainable performance of the operation.
9
| Management’s Discussion and Analysis
|
Aura Aranzazu has strengthened its commitment to sustainability and social development through concrete initiatives that combine environmental responsibility, community engagement, and corporate excellence. In celebration of World Environment Day, the site’s volunteer team carried out a major reforestation effort in the El Cobre area of Concepción del Oro, Zacatecas, planting 450 Johannis pine trees in a zone previously affected by wildfires. The activity brought together over 90 participants — including employees, contractors, students, teachers, local authorities, and citizens — demonstrating the power of collective action in ecosystem restoration. During the second quarter, Aranzazu also continued its revegetation campaign related to the TD5 tailings dam elevation project, with over 12,500 plants planted in total. These environmental efforts align with the unit’s third consecutive recognition as a Socially Responsible Company, awarded in acknowledgment of its ongoing work to promote education, sports, gender equity, continuous training, community infrastructure improvements, and respect for nature.
Also, during this quarter, the results of the 2024 Greenhouse Gas (“GHG”) inventory were obtained, confirming that our operations in Aranzazu remain below the 25,000 Ton/CO2 threshold established in the legislation.
Apoena
In the second quarter of 2025, Apoena continued to prioritize workplace safety, health, and environmental responsibility through a series of proactive campaigns and initiatives. The company’s ongoing efforts not only reinforced its strong safety culture but also engaged employees and the wider community in promoting well-being and sustainability.
Apoena maintained its important record of zero LTI, demonstrating its strong commitment to safety and risk management. In April, Apoena launched the Green April campaign to promote awareness around health and safety topics. This was followed by the Yellow May campaign, which focused on preventing traffic accidents alongside a parallel Vaccination initiative.
In June, Apoena celebrated the Environment Week with a series of activities including lectures, courses, exhibitions, an ecological blitz distributing seedlings, and a community waste collection effort. Additionally, campaigns addressing diabetes awareness and blood donation were also carried out during the month.
Moreover, Apoena continued GEMBA Walks involving multidisciplinary teams conducting daily inspections to identify risks and unsafe conditions. These walks empowered employees to take preventive actions within operational areas. Over the quarter, Apoena completed 1,323 inspections and conducted 671 behavioral interventions focused on health, safety, and environmental awareness, underscoring its dedication to maintaining a healthy and safe workplace for all.
In terms of training, Apoena recorded 4,360 hours of instruction for employees and partners, strengthening essential safety protocols and practices.
Minosa
In Q2 2025, Minosa recorded zero workplace accidents, completing 32 months (977 days) without incidents and accumulating 8,095,811.65 man-hours worked without LTI. During the quarter, 13,438.30 man-hours of training were delivered, representing 2% of the total man-hours worked.
The Governance for the 12 Critical Operational Risks program reached 35.85% implementation. The Risk Management Plan and Safe Production Laboratory project achieved 53% adherence to the year's planning, and in this quarter, we carried out a SIGA (from Portuguese “Sistema Integrado de Gestão”) audit obtaining 46% of 16 standards evaluated by SIGA's team of internal auditors. Also, a project of QR code signs was implemented, 40 signs for all operational areas, with this facilitates the review and training of policies and procedures of the operation in the workplace.
10
| Management’s Discussion and Analysis
|
The Occupational Health Plan advanced with initial occupational exams achieving 56% of the annual target, while both the Drug and Alcohol Control initiative and the Healthy Living Program reached 75% completion by the end of the first half of the year.
No environmental incidents were reported. Follow-up with Instituto de Conservación Forestal - ICF (Institute of Forest Conservation) on the request for certification of plantations in waste dumps for a future utilization plan and authorization of the River and Stream Dredging Plan by the Municipality of La Unión, Copán.
A total of 4,194 physical and chemical analyses were performed as part of the water quality monitoring plan.
Finally, 81,362.21 m³ of wastewater were discharged without exceeding regulatory thresholds.
Almas
In the second quarter of 2025, the Green April and the Yellow May campaigns stood out, reinforcing a strong culture of occupational health and safety. During Green April, awareness actions focused on accident and occupational disease prevention were carried out, including a theatrical presentation on psychosocial illnesses, aligned with the new NR-01 regulation set to take effect in May 2025. Also in April, practical tests were conducted on the emergency systems of the warehouse, in compliance with insurance requirements, with the participation of the emergency brigade.
In May, the Yellow May campaign promoted a series of educational activities, including interactive safety talks (“DDS”) on blind spots using a dump truck, a lecture with the Tocantins State Military Police on mobility and responsibility, and a Health Blitz with breathalyzer tests, all reinforcing the importance of prevention and safe choices.
In June, the "Projeto Missão: segurança” (Mission: Safety Project) was launched to strengthen the safety culture and ensure strict adherence to operational procedures. The initiative targeted different audiences as executives, managers, supervisors, and technical teams, and included interactive activities and SWOT analyses, fostering greater awareness and alignment around safety-related challenges and opportunities on site.
Regarding Environment, significant progress was made in environmental licensing, including the issuance of the Preliminary License for the Sanitary Landfill and the Environmental Licensing Waiver for the Research Tunnel, reinforcing Almas’s commitment to legality and sustainability. Key operational permits were also renewed, such as the license for storage and use of explosives.
We also held Environment Week, featuring awareness activities, distribution of eco-friendly gifts, and donation of native seedlings, engaging both direct employees and contractors. Studies to characterize the municipal dumpsite were completed, which is a crucial step for advancing the “Cata Funda” project.
During the same period, the “Projeto Cidade Digital” (Digital City Project) continued, focusing on urban safety, alongside support for the fourth edition of the “Evento Mulheres das Águas” (Women of the Waters Event), reinforcing Almas’ social and environmental commitment to the region.
Borborema Project
In the second quarter of 2025, Borborema Project reached a significant milestone in its journey towards operational excellence: 1,000 days without an LTI, totaling over 5 million man-hours worked safely. This achievement reflects the team’s commitment to the consolidation of the Aura 360 Culture, which values people above all else. Leadership played a fundamental role in this performance by proactively adopting the behavioral approach tool focused on prevention and genuine care for people.
Also during the period, during the Environment Week, Borborema reinforced its focus on water management. Employees were shown comparative data between historical average rainfall and current levels, highlighting the importance of mitigation efforts and the responsible use of water. The program also featured environmental education initiatives aimed at
11
| Management’s Discussion and Analysis
|
combating plastic pollution, including interactive panels and demonstrations of sustainable materials, reaffirming Borborema’s commitment to responsible practices and meaningful stakeholder engagement.
As a strategic milestone, the unit secured a permit to use reclaimed water, reinforcing a key pillar of its operational resilience. As of the date of this document, 100% of the new water used in the production process comes from reclaimed sources.
Environment
Aura’s environmental initiatives include comprehensive efforts to maintain regulatory compliance and foster continuous improvement across its operations, ensuring sustainable growth through the Aura 360 strategy. All environmental permits are currently in effect for active operations and construction projects, demonstrating the Company’s commitment to regulatory standards.
At the beginning of 2025, Aura revised its Greenhouse Gas (“GHG”) management approach and overall climate change strategy. We completed the review of our GHG inventories in accordance with the GHG Protocol, which enabled us to establish a consistent annual emissions time series and define a robust emissions baseline. In the first half of the year, we finalized the public registration of our GHG inventory in the FGV’s Brazilian GHG Protocol Program (“PBGHG”) and initiated the data collection and monitoring process for the 2025 inventory, advancing our carbon accounting and transparency efforts.
Additionally, Aura concluded the standardization project for Asset Retirement Obligation (“ARO”) templates, which will be used by all sites entering progressive reclamation or mine closure. The Company also defined a methodology for evaluating mine closure sequencing alternatives for its commercial operations Apoena, Minosa, and Aranzazu, and selected the specific closure scenarios for each site. Following this, Aura issued a company-wide standard for financial control of progressive reclamation, and the consulting firm contracted for this purpose has already begun mobilization at the Minosa unit to develop the basic engineering project for progressive reclamation of the site’s geotechnical structures.
In line with these efforts, Aura continues to review its standards and Health, Safety, and Environment (“HSE”) risk management practices to further standardize criteria, methodologies, and monitoring processes across all business units.
Aura’s Geotechnical Compliance
All of Aura’s tailings dams, open pit mines, underground mine, waste dumps and heap leach pads that are currently in operation or that are in care and maintenance are satisfactorily stable and comply with all current legislation and international practices.
There are tailing dams at Aranzazu, Apoena and Almas and a heap leach pad at Minosa, each of which follows safety and risk management standards. Currently studies are in development for dry stack tailings disposal at Matupá Projects. Aura Mineral's first dry stacking project is being implemented in Borborema Project, which will not require the construction of a tailings dam.
The tailings dams and heap leach pad were designed by experienced engineering companies, in accordance with the regulations in force in the areas in which the mines are located and with international best practices. All dams were built with the downstream method and have an operating manual that provides for the frequency of instrumentation reading, level controls, field inspections, among other matters. The data collected from the instruments and inspections are sent monthly to independent specialized consulting companies that evaluate the data and issue compliance reports that indicate safety conditions and recommendations, when necessary. On a monthly basis this information is reviewed by the Executive Committee. This procedure meets the highest industry standards.
The Company remains committed to the decommissioning and closure plan for the non-operational Aranzazu dams, in alignment with the Aura 360 initiative focused on social and environmental responsibility. The project is currently underway, with updates on its development and key operational aspects.
12
| Management’s Discussion and Analysis
|
In March 2025, Aura Minerals' tailings dams in operation in Brazil received the Declaration of Stability Condition, issued by an independent external consultant, in accordance with the country's legal requirement.
3.2. COMMUNITIES
Aranzazu
During the second quarter of 2025, Aranzazu continued its commitment to community development and well-being. The Betesda Clinic provided essential healthcare services to more than 330 individuals. The support program for vulnerable elderly individuals remained active, delivering basic food baskets during April, May, and June, benefiting 45 families. In addition, Aranzazu supported the repair of 15 houses in the community, positively impacting 120 people.
To celebrate Children’s Day, Aranzazu showed its support for kids and the community by hosting a big event full of fun activities like magic shows, games, snacks, and gifts for over 1,100 children. The unit also helped local schools organize their own celebrations, reaching another 330 students. Aranzazu also launched the “Projeto Casa Aura” (Aura Home Project), with more than 60 children, designed to offer a safe, creative and engaging environment, with painting classes and a museum room showcasing an impressive collection of fossils and artifacts belonging to the region’s ancestors. Through educational, cultural, and emotional support activities, Casa Aura project seeks to become a meeting point that strengthens social cohesion and offers real growth opportunities for local children. Aranzazu also continued its commitment to youth development through the Aranzazu Holding Sports Training Center, which offered soccer and baseball classes to over 225 children and youth from Concepción del Oro and neighboring communities.
As part of its community engagement efforts and in support of local religious traditions, Aranzazu contributed to the organization of religious festivities such as the traditional “Relíquia de la Virgen de San Juan” (Holy Relic of the Virgin of San Juan), which is annually celebrated by both community members and company employees, around 200 people. This initiative aimed to preserve and strengthen local customs that are part of the community’s cultural heritage.
Altogether, Aranzazu’s initiatives in the second quarter of 2025 positively impacted 3,080 people, reinforcing its ongoing dedication to community well-being and sustainable development, key pillars for maintaining strong community relations and fostering long-term growth.
Apoena
In the second quarter of 2025, Aura Apoena achieved significant progress in its social and environmental initiatives, reaffirming its commitment to increasingly responsible, sustainable, and locally engaged mining.
One of the highlights of the period was the launch of the Supplier Training Program, a project developed in partnership with Euvaldo Lodi Institute (IEL). The initiative offered 12 months of free training to 50 micro and small entrepreneurs from Pontes e Lacerda city, aiming to strengthen local businesses and contribute to a positive legacy for the region’s economy.
Another key milestone was the continuation of the Open-Door Mine program, which welcomed over 50 visitors to the Aura Apoena site. Students and residents of Pontes e Lacerda city had the opportunity to learn about operations and the principles of the Aura 360 Culture, reinforcing transparency and community engagement. Also in safety, we reached a major milestone: one year without LTI in Apoena operations. This achievement reflects the collective commitment to an increasingly strong safety culture embedded in Apoena’s daily routines.
During Environment Week, Apoena promoted a joint action with the Municipal Departments of Education and Environment, which resulted in the donation of 1,000 native seedlings produced in our plant nursery. The seedlings were distributed in the central square of Pontes e Lacerda city by public school students, fostering dialogue on reforestation and care for the local biome.
13
| Management’s Discussion and Analysis
|
The volunteer program, “AURA DO BEM” (Aura of Goodwill), also played a prominent role during the quarter. At Easter, in April, employees collected and distributed over 500 boxes of chocolates in an initiative with children and youth supported by the Social Assistance Center of Pontes e Lacerda city.
In May, we hosted an important event to enhance transparency and safety with local communities: the Dam Safety Guidance Seminar. The event brought together residents, local authorities, and technical teams to share updated information about our structures, address questions, and reinforce Apoena’s commitment to prevention, open dialogue, and responsible mining. Also, during the Yellow May campaign, a month dedicated to traffic safety awareness, it was conducted an educational campaign in partnership with the Military Police. Site employees attended lectures on safe driving behavior, both on and off the job, reinforcing Apoena’s core value of preserving life.
In June, the program launched a blood donation campaign, encouraging company volunteers to contribute to the regional blood bank located in Cáceres.
Apoena’s efforts were also publicly recognized with the Business Excellence Award from the Federation of Industries of the State of Mato Grosso (“FIEMT”) and, for the third consecutive year, Apoena was granted the "Women-Friendly Company" Seal by the Conexão Salto Alto Project, which honors companies committed to valuing, respecting, and including women in the workplace.
In addition to all these efforts, Apoena allocated R$94,000 in donations and sponsorships during this quarter, reinforcing its commitment to socioeconomic development and its ongoing support for social events and initiatives that positively impact the communities in the region where operates.
Minosa
In Q2 2025, Minosa reinforced its commitment to community well-being through impactful initiatives focused on infrastructure development, economic empowerment, and social support. These efforts reflect the dedication to building resilient communities and promoting sustainable growth in the region.
One of the most significant milestones was the successful completion of a modern sewerage system in the community of Nueva Azacualpa. Benefiting approximately 200 families, this project has significantly improved wastewater management, reduced health risks, and elevated overall living conditions. Backed by an investment of 11 million Honduran Lempiras, the initiative reflects Minosa’s strong commitment to honoring its community pledges, building sustainable infrastructure that upholds dignity and serves local needs.
Complementing these efforts, the San Andrés foundation support important projects that enhanced technical competencies and empowered women economically, promoting gender equity and also enabling new income-generating opportunities by training women to operate a sustainable small enterprise. One of the projects was a jewelry-making workshop organized in partnership with the National Institute of Vocational Training (INFOP). Women from neighboring communities participated in 40 hours of hands-on training, acquiring valuable skills in jewelry production and basic entrepreneurship. The other important project was the "Oro y Sabor" (Gold and Flavor) bakery project, creating part-time employment for 10 women from nearby communities. These projects underscore Minosa’s ongoing support for inclusive economic development and women-led entrepreneurship.
As part of the mine closure strategy, the San Andrés Foundation also conducted technical field visits to evaluate the agricultural development potential in surrounding areas. These assessments focused on land use, soil quality, and available resources, laying the groundwork for future agricultural projects that could support local economic diversification and sustainable livelihoods in a post-mining context.
14
| Management’s Discussion and Analysis
|
Health remains a central pillar of Minosa’s social responsibility strategy. The unit continues to provide medical personnel and essential medications across communities, benefiting more than 1,000 families. These contributions are vital in enhancing healthcare access, particularly in rural and underserved areas, and represent our broader commitment to strengthening community resilience and reducing health disparities.
Recognizing the transformative power of education, Minosa has also provided financial support to 29 outstanding young students from neighboring communities. By encouraging them to continue their academic journeys, we are investing in the development of future leaders who will drive sustainability, innovation, and progress in their communities.
Finally, the unit launched Phase II of the “Proyecto Semillas de Esperanza” (Seeds of Hope Project), an innovative vineyard initiative that explores the viability of grape cultivation and wine production in Honduras. This phase focuses on technical and financial assessments that could lead to the establishment of a sustainable viticulture industry. If successful, the project has the potential to generate even more economic opportunities, promote rural tourism, and serve as a model for post-mining economic transition.
Together, these initiatives reflect Minosa’s long-term vision for sustainable development, community empowerment, and shared value creation.
Almas
In Q2 2025, Almas expanded its efforts in social development by launching a series of impactful initiatives carried out in close collaboration with the local community. These initiatives underscore the Company’s lasting commitment to advancing human development, encouraging civic participation, and building strong community relationships in the regions where it operates.
Together with the communities’ members, Almas reinforced key initiatives in education, sports, and social inclusion, which significantly contributed to local development. Among the highlights were graduation ceremonies for the “Programa Educacional de Resistência às Drogas e à Violência – PROERD” (Drug Abuse Resistance Education Program), as well as for technical courses in Occupational Safety and Business Administration, benefiting around 40 students from the Almas community.
Almas also supported a football tournament in the Capão da Onça through the donation of toys, and further promoted community well-being by providing logistical support and deploying a water truck to control dust on access roads.
As part of its ongoing engagement with local communities, Almas proudly sponsored the “Pedal das Mulheres” (Women’s Cycling Ride), a community cycling event held in the city of Natividade that encouraged health, well-being, and social interaction.
Borborema Project
In the second quarter, Borborema Project continued to strengthen the pillars of the Aura 360 culture through actions focused on caring for people, territorial development, environmental sustainability, and integration with surrounding communities. In the Health and Safety area, the unit promoted the Green April campaign, with awareness activities aimed at employees and contractors, reinforcing the importance of prevention and well-being in the workplace.
Still focusing on internal relations, we held initiatives in celebration of International Women’s Day and Mother’s Day, including discussion circles and interactive sessions that addressed topics such as female empowerment, self-esteem, double shifts, and empathy among women. For Labor Day, a special lunch was organized. In June, we hosted a traditional June Fest celebration, valuing local culture and strengthening team integration.
During Environment Week, we held workshops and lectures on the impacts of plastic consumption on nature, with a special focus on actions carried out in the Quilombola Community of Negros do Riacho, reinforcing our commitment to environmental education and promoting more sustainable territories.
15
| Management’s Discussion and Analysis
|
The unit also participated in Expo Minera Nordeste 2025 with a booth titled “Como Minerar de Forma Sustentável” (How to Do Sustainable Mining) where were presented best practices, adopted technologies, and commitments to the environment and society, reinforcing Borborema’s presence as a responsible and transparent mining company.
In the Education and Social Development area, the unit made progress with the implementation of the Intervention and Learning Recovery Project in Portuguese Language and Mathematics in the village of Cruz, along with donations and educational lectures aimed at community empowerment. Additionally, Borborema held a Demand Mapping Workshop, a preparatory stage for the launch of the Supplier Training Program, scheduled for the fourth quarter. The initiative aims to prepare local entrepreneurs to operate competitively and in alignment with the demands of the mining sector.
All these actions reflect Borborema’s commitment to shared development, continuous dialogue, and the construction of a positive legacy in Currais Novos and the surrounding region.
3.3 CORPORATE GOVERNANCE
The Company’s board of directors (“Board”) and its committees seek to follow recommended corporate governance guidelines for public companies to ensure transparency and accountability to shareholders. The Board currently consists of six directors, two of whom are not considered independent of the Company and four of whom have been determined by the Board to be independent within the meaning of applicable Canadian securities laws.
The Board considers Stephen Keith, Pedro Zahran Turqueto, Richmond Fenn and Bruno Mauad to be independent within the meaning of applicable Canadian securities laws which ensures that the majority of the Board members are independent. Paulo Brito beneficially owns Northwestern Enterprises Ltd., the Company’s largest shareholder, and thus is not considered an independent director. Paulo Brito Filho is an immediate family member of Paulo Brito, Chairman of the Board, and therefore is not considered independent.
The audit committee of the Board ( “Audit Committee”) is composed entirely of and chaired by independent directors (Bruno Mauad, Stephen Keith, and Pedro Zahran Turqueto), each of whom meets the independence requirements of National Instrument 52-110 – Audit Committees, the TSX Company Manual and Board Mandate.
The Audit Committee fulfills its role of ensuring the integrity of the reported information through its review of the interim and audited annual consolidated financial statements prior to their submission to the Board for approval. The Audit Committee meets with management quarterly to review the consolidated financial statements and the MD&A, and to discuss other financial, operating, and internal control matters. The Company also retains external auditors to audit its annual consolidated financial statements.
The Audit Committee has reviewed this MD&A, pursuant to its charter, and the Board has approved the disclosure contained herein. Additionally, a copy of this MD&A shall be provided to anyone who may request it.
The Corporate Governance, Compensation and Nominating Committee currently has two members, one of whom is independent.
Ethics Committee
Aura’s Ethics Committee is entrusted with discussing, analyzing, and recommending remedial and/or preventative actions, as applicable, to the business units’ Director of Operations and/or the business units’ human resources officer (except in cases where conflicts of interest exist, in which case the Ethics Committee is responsible for taking the appropriate actions) on all reports received via the whistleblower channel (canaldeetica.com.br/aura). The whistleblower channel is managed by an independent and specialized third party, currently ICTS Alliant, ensuring confidentiality and the appropriate treatment of each report without any conflicts of interest before forwarding to the Ethics Committee. Any stakeholder may submit an anonymous report through the whistleblower channel detailing conducts considered unethical and/or considered to violate existing legislation in the countries where Aura operates.
16
| Management’s Discussion and Analysis
|
Aura’s Ethics Committee is currently composed of seven individuals: the Company’s chief executive officer (“CEO”) (chair), the corporate compliance officer and one representative from each of the operational business units.
4. OPERATIONAL HIGHLIGHTS
The table below summarizes the main consolidated operational indicators for the Company´s Q2 2025 and H1 2025:
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |
| OPERATING DATA | ||||
| Gold ore processed (tonnes) | 2,972,980 | 3,017,687 | 5,787,403 | 5,879,544 |
| Gold bullion produced (ounces) | 41,752 | 39,635 | 81,383 | 82,821 |
| Gold bullion sold (ounces)(1) | 40,162 | 38,574 | 80,181 | 82,559 |
| Copper ore processed (tonnes) | 308,922 | 303,249 | 598,132 | 606,393 |
| Copper concentrate produced (dry metric tonnes "DMT") | 21,578 | 18,831 | 40,426 | 37,764 |
| Total Production (Gold Equivalent Ounces)(1) | 64,033 | 64,327 | 124,120 | 132,514 |
Detailed explanations of the Operating Highlights can be found in chapter 7: Review of Mining Operations and Exploration
5. FINANCIAL HIGHLIGHTS
Revenue Components and Highlights:
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |
| Gold Revenue | 127,928 | 88,383 | 239,470 | 179,434 |
| Copper & Gold Concentrate Revenue | 60,875 | 50,716 | 113,632 | 95,866 |
| Provisional Prices | 1,633 | (1,476) | (862) | (2,464) |
| Revenue | 190,436 | 137,623 | 352,240 | 272,836 |
| Ounces sold (GEO)(1) | ||||
| Aranzazu | 22,290 | 24,683 | 42,745 | 49,786 |
| Apoena | 8,219 | 8,258 | 17,627 | 21,118 |
| Minosa | 17,836 | 19,738 | 35,362 | 38,966 |
| Almas | 12,917 | 10,580 | 26,018 | 22,475 |
| Borborema | 1,190 | - | 1,190 | - |
| Total ounces sold | 62,452 | 63,258 | 122,943 | 132,345 |
| Gold sales revenues, net of local sales taxes | 127,928 | 85,171 | 239,470 | 172,940 |
| Average gold market price per oz (London PM Fix) | 3,289 | 2,338 | 3,075 | 2,205 |
| Realized average gold price per ounce sold, net | 3,185 | 2,208 | 2,986 | 2,097 |
1. In the MD&A disclosed for Q2 2024, this amount was reported as gross revenue. In the current MD&A, it has been presented as net revenue.
17
| Management’s Discussion and Analysis
|
Net Revenues
Net Revenues were US$190,436 in Q2 2025, an increase of 42% when compared to the same period of 2024, and 18% increase when compared to Q1 2025. The result was mainly driven by:
| · | Sales Volume of 62,452 GEO, a 1% reduction when compared to same period of 2024, impacted by production decreases in Minosa and Apoena and the negative impact of the conversion in Aranzazu, this result was partially offset by an increase in Almas and the preliminary production of Borborema Project, for the reasons discussed previously; |
| · | Metal prices impacts: |
| o | An increase of 44% in realized average net gold price per ounce sold in Q2 2025 compared to Q2 2024, from US$2,208/oz in Q2 2024 to US$3,185/oz in Q2 2025; and |
| o | An increase of 5% in average copper sale price in Q2 2025 compared to Q2 2024, from US$4.48/lb in Q2 2024 to US$4.46/lb in Q2 2025. |
With this result, Net Revenues reached US$352,240 in H1 2025, an increase of 32% when compared to the same period of 2024. The result was mainly driven by:
| · | Sales volume of 122,943 GEO, 7% reduction when compared to same period of 2024, for the reasons discussed previously; |
| · | Metal prices impacts in H1 2025: |
| o | Average net realized prices of US$2,986, a 42% increase when compared to H2 2024; and |
| o | Average copper sales prices reached US$4.36/lb, a 5% increase when compared to H2 2024. |
Gross Profit
Gross Profit was US$103,939 in Q2 2025, an increase of 103% when compared to Q2 2024. This increase was primarily caused by the increase in gold and copper sales prices. Considering this result, the Gross Profit reached US$182,367 in the H1 2025, 86% increase compared to H2 2024.
Below is the breakdown of Gross Profit in Q2 2025 and H1 2025 by business unit:
| · | Aranzazu: US$31,487 in Q2 2025 and US$51,467 in H1 2025. |
| · | Apoena: US$12,441 in Q2 2025 and US$23,690 in H1 2025. |
| · | Minosa: US$33,720 in Q2 2025 and US$60,306 in H1 2025. |
| · | Almas: US$23,715 in Q2 2025 and US$44,328 in H1 2025. |
| · | Borborema Project: US$2,576 in Q2 2025 and H1 2025. |
For additional details, see Section 4: Operational Highlights.
Operating Income
In Q2 2025, operating income increased by 123% and was US$90,941, compared to US$40,826 in Q2 2024. This was mostly a result of the increase in gross profit, as described above. In H1 2025, Operating Income increased 105% and achieved US$158,357.
Net Income (Loss)
Net Income in Q2 2025 was US$8,147, an improvement when compared to a Net Loss of US$25,775 in Q2 2024. This result was mainly due to the improvement of Operating Income, despite the increase in Finance Costs in the quarter, mostly related to: (i) unrealized loss on gold hedges in Q2 2025, which resulted from mark-to-market (MTM) adjustments on open hedge positions, driven by increase in gold price between the start and the end of the quarter, and (ii) a non-cash loss of US$8,768 related to the settlement of the Nemesia SARL debt, as described above, with equity instruments, reflecting the difference between the fair value of the shares issued and the carrying amount of the debt acquired in the Bluestone transaction. In H1
18
| Management’s Discussion and Analysis
|
2025, Net Loss reached US$65,102, also mainly due to mark-to-market (MTM) adjustments on open hedge positions, driven by increase in gold price between the start and the end of the semester.
Adjusted Net Income (loss)
As result of increase in the Company’s Operating Income, adjusted net income in Q2 2025 was US$36,834 in the period, compared to US$9,414 in Q2 2024, excluding:
| · | Non-cash losses related to gold hedges: US$(24,304) |
| · | FX losses: US$(2,462) |
| · | Deferred taxes over non-monetary items US$6,847 |
| · | Loss on settlement of liability with equity instruments: US$(8,768) |
Adjusted EBITDA
Adjusted EBITDA reached another record high of U$106,224 in Q2 2025, a 90% increase compared to Q2 2024, marking the fourth consecutive quarterly record reported by Aura. The increase was driven by higher gold prices, partially offset by the expected cost increase considering the Apoena investment phase. Adjusted EBITDA grew by 30% from Q1 2025, mainly due to higher metal prices. With this result, Aura Adjusted EBITDA ended H1 2025 at US$187,703, a 73% increase compared to H1 2024.
The Adjusted EBITDA by business unit for Q2 2025 and H1 2025 is presented below:
| · | Aranzazu: US$35,684 in Q2 2025 and US$60,254 in H1 2025. |
| · | Apoena: US$16,151 in Q2 2025 and US$29,697 in H1 2025. |
| · | Minosa: US$33,533 in Q2 2025 and US$60,646 in H1 2025. |
| · | Almas: US$24,709 in Q2 2025 and US$47,136 in H1 2025. |
| · | Borborema Project: US$2,084 in Q2 2025 and US$2,212 in H1 2025. |
| · | Projects (including Era Dorada): (US$1,153) in Q2 2025 and (US$1,968) in H1 2025. |
| · | Corporate: (US$4,784) in Q2 2025 and (US$10,274) in H1 2025. |
Gross Debt
Total gross debt (short and long-term portion) was US$453,893 at the end of Q2 2025, a decrease when compared to $467,687 at the end of Q1 2025. This decrease was mainly driven by the reduction of US$13,794 due to the settlement of Nemesia SARL debt, as mentioned above.
Net Debt
Net Debt was US$280,560 by Q2 2025, due to capex of US$50,327, mostly related to payments related to the construction of the Borborema Project and dividends payment of US$29,811. These impacts were partially offset by the higher cash generation during the quarter.
Sales, Cash Cost and All in Sustaining Costs Highlights
For a reconciliation between cost of goods sold, cash operating costs per GEO sold and All in Sustaining Costs (“AISC”) per GEO sold, please see Section 17: Non-GAAP Financial Measures.
GEO sold, cash operating costs per GEO sold, and AISC per GEO sold for Q2 2025 and H1 2025 were as follows:
19
| Management’s Discussion and Analysis
|
| Three months ended June 30 | 2025 | 2024 | ||||
| GEO Sold | Cash operating costs per GEO sold | All In Sustaining costs per GEO sold | GEO Sold | Cash operating costs per GEO sold | All In Sustaining costs per GEO sold | |
| Aranzazu | 22,290 | 1,110 | 1,514 | 24,683 | 958 | 1,206 |
| Apoena | 8,219 | 1,168 | 1,751 | 8,258 | 1,252 | 1,958 |
| Minosa | 17,836 | 1,178 | 1,292 | 19,739 | 1,094 | 1,159 |
| Almas | 12,917 | 1,167 | 1,364 | 10,589 | 1,203 | 1,434 |
| Borborema | 1,190 | 936 | 1,441 | - | - | - |
| Total / Average | 62,452 | 1,146 | 1,449 | 63,269 | 1,080 | 1,328 |
| Total / Average ex-Apoena | 54,233 | 1,142 | 1,399 | 55,011 | 1,054 | 1,275 |
| Six months ended June 30 |
2025 | 2024 | ||||
| GEO Sold | Cash operating costs per GEO sold | All In Sustaining costs per GEO sold | GEO Sold | Cash operating costs per GEO sold | All In Sustaining costs per GEO sold | |
| Aranzazu | 42,745 | 1,136 | 1,529 | 49,786 | 942 | 1,235 |
| Apoena | 17,627 | 1,200 | 1,906 | 21,118 | 941 | 1,500 |
| Minosa | 35,362 | 1,164 | 1,271 | 38,967 | 1,140 | 1,223 |
| Almas | 26,018 | 1,118 | 1,279 | 22,485 | 1,176 | 1,428 |
| Borborema | 1,190 | 936 | 1,441 | - | - | - |
| Total / Average | 122,943 | 1,147 | 1,455 | 132,356 | 1,040 | 1,307 |
| Total / Average ex-Apoena | 105,316 | 1,139 | 1,379 | 111,238 | 1,059 | 1,300 |
The main reasons for the changes in the All In Sustaining Costs per mine during Q2 2025 and H1 2025 were:
| · | Aranzazu: AISC was US$1,514 in the quarter, representing a 26% increase compared to the same period last year mainly due to differences in metal prices. At constant metal prices, AISC decreased by 3% when compared to Q2 2024. The decrease in AISC versus last year is a result from higher grades and recoveries, in line with planned mine sequencing, partially offset by higher investments in primary development and tailing dams. In H1 2025, the AISC was US$1,248, an increase of 1% compared to the same period in 2024 at same metal prices. |
| · | Apoena: AISC was US$1,751, a 11% decrease when compared to Q2 2024, mainly driven by increase in the proportion of costs capitalized as expansion capex, related to the Nosde pit. In H1 2025, the AISC was US$1,906, an increase of 27% compared to the same period in 2024, which was expected considering the mine sequencing. |
| · | Minosa: In Q2 2025 AISC increased by 12% when compared to Q2 2024, reaching US$1,292. The increase is driven by slightly lower stockpile due to higher rainfall levels during the period. In H1 2025, the AISC was US$1,271, an increase of 4% compared to the same period in 2024, due to lower grades and slightly higher mine costs. |
| · | Almas: In Q2 2025, Almas AISC decreased by 5% compared to Q2 2024, reaching US$1,364, primarily driven by improved operational performance and higher ore throughput, along with lower Capex during the quarter. In H1 2025, the AISC was US$1,279, a decrease of 10% compared to the same period in 2024, mainly as result of the successful change in mine contractor during Q2 2024. |
| · | Borborema: In Q2 2025, Borborema produced its first gold pour at an AISC of US$1,441/oz. |
6. OUTLOOK AND KEY FACTORS
2025 Outlook vs. H1 2025 Results:
The Company is on track to meet its guidance for the current fiscal year, including production, cash cost, All-In Sustaining Cost (AISC), and capital expenditures, demonstrated by the first half results and considering that production at Borborema Project is expected to achieve commercial production by Q3 2025.
20
| Management’s Discussion and Analysis
|
Production:
Gold equivalent ounces production ('000 GEO) - 2025 | ||||||||||||||||||||
| Low - 2025 | High - 2025 | H1 2025 A | H1
2025 at Guidance metal prices | % | ||||||||||||||||
| Minosa (San Andrés) | 64 | 73 | 36 | 36 | 55% - 49% | |||||||||||||||
| Apoena (EPP) | 29 | 32 | 17 | 17 | 59% - 53% | |||||||||||||||
| Aranzazu | 88 | 97 | 43 | 48 | 49% - 44% | |||||||||||||||
| Almas | 51 | 58 | 26 | 26 | 51% - 45% | |||||||||||||||
| Total ex-Borborema | 233 | 260 | 122 | 127 | 52% - 47% | |||||||||||||||
| Borborema | 33 | 40 | 3 | 3 | 8% - 6% | |||||||||||||||
| Total | 266 | 300 | 124 | 129 | 47% - 41% | |||||||||||||||
Cash operating costs per gold equivalent ounce sold3:
| Cash Cost per equivalent ounce of gold produced - 2025 | ||||||||||||||||||||
| Low - 2025 | High - 2025 | H1 2025 A | H1 2025 at Guidance metal prices | % | ||||||||||||||||
| Minosa (San Andrés) | 1,108 | 1,219 | 1,178 | 1,178 | 106% - 97% | |||||||||||||||
| Apoena (EPP) | 1,258 | 1,384 | 1,168 | 1,168 | 93% - 84% | |||||||||||||||
| Aranzazu | 1,029 | 1,132 | 1,110 | 950 | 108% - 98% | |||||||||||||||
| Almas | 1,013 | 1,114 | 1,167 | 1,167 | 115% - 105% | |||||||||||||||
| Borborema | 1,084 | 1,232 | 936 | 936 | 86% - 76% | |||||||||||||||
| Total | 1,078 | 1,191 | 1,146 | 1,080 | 96% - 106% | |||||||||||||||
All-in Sustaining cost per gold equivalent ounce sold:
| AISC per equivalent ounce of gold produced - 2025 | ||||||||||||||||||||
| Low - 2025 | High - 2025 | H1 2025 A | H1 2025 at Guidance metal prices | % | ||||||||||||||||
| Minosa (San Andrés) | 1,263 | 1,364 | 1,279 | 1,279 | 101% - 94% | |||||||||||||||
| Apoena (EPP) | 2,425 | 2,619 | 1,906 | 1,906 | 79% - 73% | |||||||||||||||
| Aranzazu | 1,348 | 1,455 | 1,532 | 1,295 | 114% - 105% | |||||||||||||||
| Almas | 1,113 | 1,202 | 1,279 | 1,279 | 115% - 106% | |||||||||||||||
| Borborema | 1,113 | 1,304 | 1,186 | 1,186 | 107% - 91% | |||||||||||||||
| Total | 1,374 | 1,492 | 1,456 | 1,367 | 98% - 106% | |||||||||||||||
3 Cash operating costs per gold equivalent ounce sold is a non-GAAP financial measure with no standardized meaning under IFRS, and therefore may not be comparable to similar measures presented by other issuers. For further information and detailed reconciliations to the most directly comparable IFRS measures, see Section 17: Non-GAAP Performance Measures in this MD&A.
21
| Management’s Discussion and Analysis
|
Capex:
| Capex (US$ million) - 2025 | ||||||||||||||||
| Low - 2025 | High - 2025 | H1 2025 A | % | |||||||||||||
| Sustaining | 40 | 47 | 22 | 55% - 47% | ||||||||||||
| Exploration | 10 | 13 | 6 | 60% - 45% | ||||||||||||
| New projects + Expansion | 99 | 106 | 74 | 75% - 70% | ||||||||||||
| Total | 149 | 167 | 102 | 61% - 68% | ||||||||||||
7. REVIEW OF MINING OPERATIONS AND EXPLORATION
Aranzazu
Introduction
Aranzazu is an underground copper mine 100% owned by Aura, located in Zacatecas, Mexico approximately 250 km from Monterrey. Documented evidence of mining in the area dates back almost 500 years. The current mine has been in operation since 1962, with Aura assuming ownership in 2010. After being put on care and maintenance in 2015, new management re-analyzed the business, and the operation restarted in 2018.
Operational Performance
The table below sets out selected operating information for Aranzazu for the three and six months ended June 30, 2025, and 2024:
22
| Management’s Discussion and Analysis
|
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |
| Ore mined (tonnes) | 316,042 | 302,381 | 611,740 | 600,305 |
| Ore processed (tonnes) | 308,922 | 303,249 | 598,132 | 606,393 |
| Copper grade (%) | 1.59% | 1.49% | 1.53% | 1.50% |
| Gold grade (g/tonne) | 0.90 | 0.79 | 0.87 | 0.81 |
| Silver grade (g/tonne) | 22.31 | 20.67 | 22.23 | 21.12 |
| Copper recovery | 91.6% | 89.6% | 90.7% | 89.9% |
| Gold recovery | 83.1% | 79.8% | 82.1% | 80.4% |
| Silver recovery | 64.7% | 59.7% | 64.1% | 62.0% |
| Concentrate production: | ||||
| Copper concentrate produced (DMT) | 21,578 | 18,831 | 40,426 | 37,764 |
| Copper contained in concentrate (%) | 20.9% | 21.5% | 20.6% | 21.7% |
| Gold contained in concentrate (g/DMT) | 10.8 | 10.2 | 10.6 | 10.5 |
| Silver contained in concentrate (g/DMT) | 206.6 | 198.9 | 211.3 | 210.8 |
| Copper equivalent pounds produced ('000 Lb) | 9,922 | 8,932 | 18,383 | 18,065 |
| Molybdenum Production (Klbs) | 58 | - | 58 | - |
| Total Production (Gold Equivalent Oz - GEO) | 22,281 | 24,709 | 42,737 | 49,710 |
| Total Sales (Gold Equivalent Oz - GEO) | 22,290 | 24,683 | 42,745 | 49,786 |
| Average cash operating cost (US$/GEO) | 1,110 | 958 | 1,136 | 942 |
| All In Sustaining costs (US$/GEO) | 1,514 | 1,206 | 1,529 | 1,235 |
| · | Aranzazu continued showing stable and reliable operation in Q2 2025, in accordance with the Company’s plan. |
| · | Ore mined during Q2 2025 was 316,042 tons, in line with the mine sequencing for the quarter and 5% increase when compared to Q2 2024 and 7% increase when compared to Q1 2025. In H1 2025, the total ore mined was 611,740, a 4.5% increase when compared to H1 2024. |
| · | Increase in recovery compared to Q2 2024 was due to improved stability in the grinding and flotation processes. Implementation of new reagents with better performance, along with automation efforts and integration of predictive analysis for operational control in the grinding and flotation circuits. |
| · | In Q2 2025, copper and gold grades were 1.59% Cu and 0.90 g/t Au an increase of 7% and 14%, respectively, with no significant variance from Q1 when they were 1.48% Cu and 0.84 g/t Au, and in line with the mine planning. |
For changes in the AISC (US$/GEO) in the period, please consult Section 4: Operational Highlights.
Strategic Developments and Geology
During Q2 2025, a total of 5,196m were drilled in 7diamond drill holes in Aranzazu mine, including 2,724m in the Glory Hole (GH) zone from underground and 2,694m in Esperanza from surface.
In the Glory Hole (GH) zone, six holes were concluded to convert from Inferred Mineral Resources to Indicated Mineral Resources below level 1625 . Drilling confirmed the continuity of mineralized skarn in the deeper levels of GHHW zone. All reported grades are over apparent thickness.
| o | Hole M-25-0205 intersected 1.06% Cu, 0.38 g/t Au, 11 g/t Ag over 9.4m; |
| o | Hole M-25-0231 intersected 0.95% Cu, 0.33 g/t Au, 10 g/t Ag over 26m; |
| o | Hole M-25-0232 intersected 5.86% Cu, 1.3 g/t Au, 62 g/t Ag over 25.5m; |
| o | Hole M-25-0233 intersected 0.60% Cu, 0.39 g/t Au, 11 g/t Ag over 3.25m; |
| o | Hole M-25-0234 intersected 1.77% Cu, 0.45 g/t Au, 13 g/t Ag over 5.5m; |
| o | Holes M-25-0235 up and M-25-0236 intersected skarn mineralization (Pending Assays). |
23
| Management’s Discussion and Analysis
|
In Esperanza, 3 holes were concluded and additional drilling is planned to assess potential continuity of mineralization identified in the last year drilling campaign. This drilling should be completed late Q3. First assays confirmed the skarn mineralization.
| o | Hole M-25-0220 intersected 0.72%Cu, 0.27 g/t Au, 5 g/t Ag over 3.35m; |
| o | Hole M-25-0221 intersected 2.3%Cu, 0.88 g/t Au, 20 g/t Ag over 6.4m; |
| o | Holes M-25-0223 intersected skarn (Pending Assays) |
Quality Assurance and Quality Control (“QA/QC”)
Analytical work was carried out by ALS Chemex (“ALS”), in Vancouver, Canada. Drill core samples were shipped to ALS for preparation and analysis. Sample preparation included drying at 105 °C, crushing to 85% passing a ¼" Tyler 9 mesh (US Std. No.10), splitting using a Jones riffle splitter to obtain 250–280 g subsamples, and pulverizing to 85% passing a Tyler 200 mesh (US Std. No. 200, -75 µm).
Gold values were determined using standard fire assay (FA) on 30–50 g aliquots, followed by aqua regia digestion and atomic absorption spectrometry (AAS) finish. In addition, 35-element multi-element analysis was performed using inductively coupled plasma atomic emission spectroscopy (ICP-AES) with four-acid digestion. Overlimit values were re-assayed using AAS when applicable.
At the drill site, cores are placed in plastic boxes (2.5” high × 0.60 m long × 0.30 m wide), marked with depth indicators, and transported by drilling contractors to the logging facility. Logging and sampling are conducted under the supervision of geologists. Sample intervals typically range from 0.3 m to 1.5 m, avoiding geological contacts. The core is cut lengthwise with a core cutting machine (saw) along a geologist-drawn line to preserve orientation. The top half is bagged and tagged for laboratory shipment, while a corresponding tag is stapled in the core box for reference.
Aranzazu has implemented a standardized QA/QC protocol for its drilling programs. Insertion rates are as follows: blanks at 3% to 4% (1 in 25 samples), duplicates at 2% (1 in 50 samples), and certified reference materials (CRMs) at 4% to 5% (1 in 20 to 25 samples). These rates address mineralization heterogeneity and aim to reduce sampling errors and grade variability during pulverization.
Duplicates are inserted into the sample stream at a rate of approximately 1 in 50. Field duplicates are generated by splitting the core lengthwise—retaining one half as backup—and further dividing the other half into two quarters, each labeled with different sample numbers in the same batch. Pulp duplicates are prepared after pulverization and homogenization, with the primary laboratory instructed to take a double pulp from the same sample.
As part of its QA/QC program, Aranzazu also submits pulp duplicates to a third-party laboratory—SGS Geosol, located in Durango, Mexico—for external verification of assay results using the same analytical protocols. Results are considered valid when the relative error (RE) between laboratories is within 10%.
Apoena
Introduction
Apoena is located in Mato Grosso, Brazil, approximately 450 km west of Cuiabá, the state capital and 12 km from the town of Pontes e Lacerda. The complex consists of a processing plant fed by satellite mines such as Lavrinha, Japonês, Ernesto and Nosde, all of which are under operation.
24
| Management’s Discussion and Analysis
|
Operating Performance
The table below sets out selected operating information for Apoena for the three and six months ended June 30, 2025, and 2024.
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |
| Ore mined (tonnes) | 334,622 | 421,137 | 783,630 | 974,947 |
| Waste mined (tonnes) | 5,638,516 | 3,558,684 | 9,187,251 | 7,214,884 |
| Total mined (tonnes) | 5,973,138 | 3,979,822 | 9,970,881 | 8,189,831 |
| Waste to ore ratio | 16.85 | 8.45 | 12.38 | 7.53 |
| Ore plant feed (tonnes) | 401,821 | 348,193 | 759,241 | 722,556 |
| Grade (g/tonne) | 0.73 | 0.95 | 0.77 | 1.03 |
| Recovery (%) | 92% | 92% | 94% | 92% |
| Production (ounces)¹ | 8,219 | 9,912 | 17,095 | 22,017 |
| Sales (ounces)¹ | 8,219 | 8,258 | 17,627 | 21,118 |
| Average cash operating cost (US$/oz) | 1,168 | 1,252 | 1,200 | 941 |
| All In Sustaining costs (US$/oz) | 1,751 | 1,958 | 1,906 | 1,500 |
Results for Apoena Mines during Q2 2025 and H1 2025 are as follows:
| · | Total ore mined in Apoena decreased by 22% when compared to Q2 2024, due to reduced ore availability as a result of ongoing mine development activities during the quarter. When compared to Q1 2025, total ore mined reduced by 29%, reflecting the focus on mine development activities, particularly the removal of waste material (pre-stripping) to access deeper mineralized zones, this focus is also the reason that the strip ratio increased during the quarter. In H1 2025, total ore mined was 777,491 tons, decreasing 20% compared to H1 2024. |
| · | Despite the reduction in ore mined, plant feed in Q2 2025 increased by 12% compared to Q1 2025 and increased by 15% year-over-year. The variation reflects the improved ore performance due to a more friable feed material in contrast to the Q2 2024 scenario characterized by the hardness of the Nosde ore, mainly due to processing of metarenite ore during the quarter, a more competent and tenacious rock type with lower grindability, which limited milling throughput when compared to the friable milonitic ore processed in prior periods. |
| · | In Q2 2025, grades reached 0.75 g/t Au, a 7% decrease when compared to Q1 2025, and a 21% reduction when compared to Q2 2024, due to mine sequencing and according to the plan. |
| · | In Q2 2025, recovery decreased by 3% over Q1 2025, and in line when compared to Q2 2024, as result of lower amount of milonite, an ore with lower recovery |
| · | For additional details on the changes in the AISC (US$/GEO), please consult Section 4: Operational Highlights. |
Strategic Developments and Geology
During Q2 2025, 5.489m of drilling was completed at the Apoena Project, with 967.27 meters at the Pombinhas target and 4,521.73 meters at the Nosde target. The exploration efforts were focused on drilling at the Nosde target (15 drillholes) to assess the continuity of mineralization in the middle and lower traps, the same mineralized levels mined at the Ernesto mine. These drill holes confirm the continuity (~15 meters in the middle trap and ~3-5 meters in the lower trap). Twelve drill holes have already been drilled, and the best results are presented below:
25
| Management’s Discussion and Analysis
|
| Hole | X | Y | Z | Depth (meters) | Dip (degrees) | Az (degrees) | From (meters) | To (meters) | Length (meters) | Au (g/t) |
| NSD0381 | 256162 | 8304524 | 464 | 499 | -90 | 0 | 144.0 | 149.0 | 5.0 | 2.58 |
| 483.7 | 484.5 | 0.8 | 3.95 | |||||||
| 489.7 | 490.8 | 1.1 | 38.21 | |||||||
| NSD0382 | 255649 | 8304844 | 385 | 415 | -89 | 330 | 399.2 | 399.6 | 0.4 | 10.36 |
| NSD0383 | 255560 | 8304893 | 377 | 421 | -90 | 0 | 311.5 | 313.0 | 1.5 | 2.02 |
| NSD0384 | 256144 | 8304488 | 464 | 502 | -90 | 0 | 494.5 | 498.6 | 4.1 | 1.42 |
| 494.5 | 496.5 | 1.9 | 2.38 | |||||||
| NSD0385 | 256006 | 8304645 | 408 | 517 | -88 | 260 | 146.8 | 150.0 | 3.2 | 0.74 |
| 154.4 | 157.0 | 2.6 | 1.86 | |||||||
| 187.5 | 192.2 | 4.7 | 3.16 | |||||||
| NSD0386 | 255558 | 8304787 | 341 | 367 | -88 | 60 | 247.0 | 254.0 | 7.0 | 1.84 |
| 258.0 | 262.0 | 4.0 | 2.14 | |||||||
| 264.0 | 267.0 | 3.0 | 0.67 | |||||||
| 308.0 | 309.5 | 1.5 | 0.63 | |||||||
| 358.5 | 360.5 | 0.4 | 2.4 | |||||||
| NSD0387 | 255492 | 8304805 | 346 | 388 | -88 | 300 | 219.0 | 220.5 | 1.5 | 2.8 |
| 242.0 | 249.0 | 7.0 | 5.88 | |||||||
| 247.0 | 249.0 | 2.0 | 18.12 | |||||||
| 268.5 | 270.0 | 1.5 | 0.59 | |||||||
| 378.4 | 379.5 | 1.1 | 0.57 | |||||||
| NSD0388 | 256194 | 8304569 | 459 | 490 | -88 | 280 | 475.0 | 476.0 | 1.0 | 0.37 |
| NSD0390 | 255417 | 8304789 | 355 | 262 | -84 | 95 | 194.0 | 195.0 | 1.0 | 1.35 |
| NSD0391 | 256118 | 8304575 | 451 | 521 | -84 | 320 | 135.0 | 170.0 | 35.0 | 0.51 |
| 377.0 | 378.0 | 1.0 | 3.95 | |||||||
| 513.0 | 521.0 | 8.0 | 1.4 | |||||||
| NSD0392 | 255521 | 8304710 | 365 | 382 | -82 | 90 | 208.0 | 209.0 | 1.0 | 0.38 |
| 367.9 | 373.1 | 5.1 | 20.37 | |||||||
| 372.0 | 373.1 | 1.1 | 54.95 |
*All reported grades are over apparent thickness
At the Pombinhas target, 5 holes have been drilled to better delineate the target. Visually, the intercepts show oxidized and fresh pyrite with chlorite, hematite and sericitic alterations and visual gold specks associated with sulfide in metaconglomerate (Middle Trap) and mylonite (Lower Trap).
For the second semester , a geophysical survey (IP) is planned on the near mine new targets (Maraboa, Cantina and Jiboinha). Aura intends to conduct 23.8 km of regional geophysics at Maraboa-Cantina, divided into 18 lines with 494 stations, and 24.3 km at Jiboinha, also divided into 18 lines with 494 stations, totaling 48.1 km, 39 lines, and 1,001 stations.
Regional work will continue at the Pombinhas, Ernesto East and Japones West targets with a total of 11,500 meters of exploration drilling planned.
26
| Management’s Discussion and Analysis
|
Quality Assurance and Quality Control (“QA/QC”)
Apoena Analytical work was carried out by SGS Geosol Lab (“SGS”), in Belo Horizonte, Brazil. Drill core samples were shipped to SGS’s Lab. All samples were analyzed for gold values determined by fire assay method with atomic absorption spectrometry finish on 50g aliquots. SGS has routine quality control procedures which are independent from the Company’s. The Company has established a standard QA/QC procedure for the drilling programs at Apoena mines as below . Each batch of samples sent to the lab is composed of approximately 40 core samples and four QA/QC samples (two blanks and two standards). The number of control standards should reflect the size of the analytical batch used by the laboratory. These QA/QC samples are randomly spaced into each batch. The bags labeled with these numbers are filled with 50 grams of one of the control standards and the sample tag is inserted in the bag. Records of which control standard was put in each bag in the sample log or sample cards are kept.
Minosa
Minosa is a wholly owned subsidiary of Aura and is located 360 km from Honduras’ capital of Tegucigalpa in the western highlands of the country. Exploration and artisanal mining have been conducted in the area since the 1930s with modernization beginning in 1983. Aura acquired the property and infrastructure in 2009 and currently operates the open pit, heap-leach complex.
Operating Performance
The table below sets out selected operating information for Minosa for the three and six months ended June 30, 2025, and 2024:
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |
| Ore mined (tonnes) | 2,319,905 | 2,233,086 | 4,429,960 | 4,441,245 |
| Waste mined (tonnes) | 517,081 | 1,011,342 | 1,192,505 | 2,225,060 |
| Total mined (tonnes) | 2,836,986 | 3,244,428 | 5,622,465 | 6,666,306 |
| Waste to ore ratio | 0.22 | 0.45 | 0.27 | 0.50 |
| Ore plant feed (tonnes) | 1,935,739 | 2,284,891 | 3,946,314 | 4,404,619 |
| Grade (g/tonne) | 0.42 | 0.42 | 0.42 | 0.42 |
| Recovery (%) | 65% | 65% | 68% | 66% |
| Production (ounces) | 18,039 | 19,142 | 35,693 | 38,328 |
| Sales (ounces) | 17,836 | 19,728 | 35,345 | 38,951 |
| Average cash operating cost (US$/oz) | 1,184 | 1,094 | 1,166 | 1,140 |
| All In Sustaining costs (US$/oz) | 1,309 | 1,159 | 1,279 | 1,223 |
Results for Minosa during Q2 2025 and H1 2025 are as follows:
| · | Ore mined reached 2,319,905 tons in the quarter, a 4% reduction from Q2 2024 and a 10% increase from Q1 2025, as planned for the quarter. In H1 2025, the total ore mined was 4,429,960 tonnes, in line when compared to H1 2024. |
| · | In Q2 2025, grades reached 0.42 g/t Au, in line when compared to Q1 2024 and Q1 2025 due to mine sequencing for this quarter. In H1 2025, grades reached 0.42 g/t Au, in line when compared to the same period of 2024. |
| · | In Q2 2025, waste-to-ore ratio decreased to 0.22x (compared to 0.32x in Q1 2025 and 0.45x in Q2 2024) due to mine sequencing. Aura is expected to have an increase in this ratio during the year, which is in line with the yearly production plan. |
| · | For changes in the AISC (US$/GEO) in the period, please consult Chapter 4. |
27
| Management’s Discussion and Analysis
|
Strategic Developments and Geology
During Q2, geochemical results from the sulfide exploration project were received from two diamond drill holes drilled in Q1 for a total of 799m. In total, 784 drill core samples were analyzed using the Fire-Assay method and ICM40B applying Inductively Coupled Plasma Mass Spectrometry (ICP-MS) and Emission Inductively Coupled Plasma Spectroscopy (E-ICP) techniques, submitted to SGS Peru. The description, interpretation and analysis were made for a low sulfidation epithermal vein system, with type ore textures crustiform, comb and breccia, alteration marked by the presence of illite/smectite and adularia and contents of Au, Ag, Pb, Zn, Ba. These drill holes confirm the continuity of a structurally controlled vein system. An additional 2,600m will be completed in the second semester..
The sulfide zone is not part of the Mineral Resources in Minosa, and the result of drilling is not material to the current heap leach operation. Minosa is evaluating other scenarios for sulfide mineral inventories in the San Andres mine. The best intercept results are presented below:

*All reported grades are over apparent thickness
Quality Assurance and Quality Control (“QA/QC”)
The samples are sent to the internal laboratory in the Minosa mine, where they are weighed, pulverized, and homogenized. Six percent of certified reference material (“CRM”) and three percent of Blank samples are inserted into the sample streams sent to the laboratory to verify accuracy, precision, and contamination. Eleven Gold Certified Reference Material with ranging value from 0.1 ppm to 2.14 ppm and one type of blank rock from the region have been used. The samples are analyzed for Gold using the Au_FA30 (Fire assay/AAS, 30g) and Au_CN10 (Hot cyanide/AAS, 10g) methods, both with 0.01ppm in the lower detection limit. All the samples were sent to SGS lab in Lima, Peru.
From the start of 2022, Minosa introduced duplicate samples to stream QA/QC samples for all diamond drill cores at an insertion rate of 2%.
28
| Management’s Discussion and Analysis
|
Almas
Introduction
Almas is an open pit gold mine located in the state of Tocantins, Brazil, and is wholly owned by Aura has recently completed its first full year of operation, exceeding the initial annualized gold production estimate of 51,000 ounces. This milestone underscores the success of Aura's first greenfield project.
Operating performance
The table below sets out selected operating information for Almas for the three and six months ended June 30, 2025, and 2024:
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |
| Ore mined (tonnes) | 715,659 | 440,508 | 1,322,315 | 826,906 |
| Waste mined (tonnes) | 4,349,512 | 1,804,356 | 7,955,234 | 3,816,265 |
| Total mined (tonnes) | 5,065,171 | 2,244,864 | 9,277,549 | 4,643,172 |
| Waste to ore ratio | 6.08 | 4.10 | 6.01 | 4.65 |
| Ore plant feed (tonnes) | 490,003 | 384,603 | 936,431 | 752,370 |
| Grade (g/tonne) | 0.94 | 0.97 | 1.00 | 1.03 |
| Recovery (%) | 88% | 91% | 89% | 91% |
| Production (ounces)¹ | 12,917 | 10,589 | 26,018 | 22,484 |
| Sales (ounces)¹ | 12,917 | 10,589 | 26,018 | 22,484 |
| Average cash operating cost (US$/oz) | 1,167 | 1,203 | 1,118 | 1,176 |
| All In Sustaining costs (US$/oz) | 1,364 | 1,434 | 1,279 | 1,428 |
Results for Almas during Q2 2025 and H1 2025 are as follows:
| · | Ore mined during the quarter was 715,659 tons, a 62% increase when compared to Q2 2024, related to the change in the contractor which occurred during Q2 2024 and full ramp-up of the mine. When compared to Q1 2025, ore mined increased 18%, in line with the mine plan, which anticipated a higher movement of waste during Q1. |
| · | Plant feed increased by 27% when compared to Q2 2024 and 10% higher than Q1 2025, due to the Company's investment to expand Almas' capacity to 1.8 million tonnes per month. |
| · | The average grade was approximately 0.94 g/t Au in Q2 2025, a 3% decrease when compared to Q2 2024, in line with mine sequencing. This effect is expected to be mitigated by the planned expansion project, which includes the addition of new leach tanks in the fourth quarter of 2025. The grade decreased by 11% when compared to the previous quarter, also related to the mine sequencing as mentioned above . |
| · | For an analysis of the AISC (US$/GEO) in the period, please consult Section 4: Operational Highlights. |
Strategic Developments and Geology
In Q2, Aura concluded 4 directional diamond holes, totaling 1,577.25 meters (holes PAI-014, PAI-015, PAI-020, and PAI-021). This drilling aims to tighten the drilling grid below the Paiol mine mineral reserve pit to convert approximately 150 kOz of Inferred Mineral Resources to the Indicated category.
The analytical results released in Q2 are presented in the table below, highlighting the metric intervals above 2.0 g/t in holes PAI-014-D1B and PAI-015-D1, indicating that the high-grade mineralization continues at greater depth. Likewise, hole PAI-026 stands out for its impressive result of 16.15m @ 2.03 g/t Au (including 6.0 m @ 3.90 g/t Au). This hole was drilled in the southern portion of the pit where potential for an underground opportunity has been evaluated.
29
| Management’s Discussion and Analysis
|
| Hole | X | Y | Z | Depth (meters) | Dip (degrees) | Az (degrees) | From (meters) | To (meters) | Length (meters) | Au (g/t) |
| PAI-14-D1B | 264833 | 8706064 | 39 | 622 | 40 | 100 | 571.50 | 595.00 | 23.50 | 0.84 |
| 571.50 | 572.50 | 1.00 | 2.58 | |||||||
| 579.40 | 580.40 | 1.00 | 5.69 | |||||||
| 588.40 | 589.00 | 0.60 | 2.41 | |||||||
| 594.00 | 595.00 | 1.00 | 3.65 | |||||||
| PAI-015-D1 | 264738 | 8706027 | -37 | 721 | 40 | 100 | 662.05 | 685.20 | 23.15 | 0.73 |
| 662.05 | 664.05 | 2.00 | 1.55 | |||||||
| 667.05 | 668.05 | 1.00 | 1.64 | |||||||
| 671.80 | 672.80 | 1.00 | 1.43 | |||||||
| 677.80 | 679.20 | 1.40 | 1.52 | |||||||
| 683.20 | 685.20 | 2.00 | 2.89 | |||||||
| PAI-026 | 264760 | 8705619 | 378 | 335 | 70 | 105 | 272.70 | 288.85 | 16.15 | 2.03 |
| 279.85 | 285.85 | 6.00 | 3.90 | |||||||
| PAI-028 | 264706 | 8705703 | 400 | 380 | 60 | 105 | 327.35 | 352.55 | 25.20 | 0.53 |
| 331.80 | 334.80 | 3.00 | 1.22 | |||||||
| 347.85 | 352.55 | 4.70 | 1.14 | |||||||
| PAI-030 | 264597 | 8705328 | 370 | 218 | 55 | 110 | 144.25 | 180.45 | 36.20 | 0.50 |
| 150.25 | 151.25 | 1.00 | 1.73 | |||||||
| 160.25 | 163.25 | 3.00 | 2.61 | |||||||
| PAI-033 | 264589 | 8705403 | 370 | 269 | 50 | 110 | 205.45 | 231.75 | 26.30 | 0.39 |
| 214.45 | 217.45 | 3.00 | 1.06 |
*All reported grades are over apparent thickness
Aura conducted geotechnical drilling for the Paiol Underground study, with seven holes totaling 1,893.20 meters.
In Q2, Aura also drilled five holes, totaling 1,227.95 meters in the Cata Funda deposit. This drilling is intended to convert Inferred Mineral Resources within Mineral Resource pit outline. It is noteworthy that hydrothermal alteration zones were intercepted, as predicted by the 3D geological model, where intense Po+Py+Cpy sulfidation was observed. Analytical results from this drilling, as well as those from the two Paiol directional holes (PAI-014-D2 and PAI-015-D2B), are expected in late July.
Directional drilling at Paiol is scheduled to continue in Q3 2025, with four more holes expected to be completed by the end of August. Aura will also begin resource conversion drilling at the Vira-Saia deposit and conduct exploration drilling at the Nova Prata target to assess the lateral continuity of the gold mineralization encountered in 2023 and 2024. In Q3, the Almas exploration team will also conduct soil sampling in the Paiol-Cata Funda trend, specifically in the Ijuí target region.
Quality Assurance and Quality Control (“QA/QC”)
Almas’QA/QC program requires that the following minimum number of control samples be inserted into the drilling samples being submitted to SGS Geosol Lab (“SGS”), in Belo Horizonte, Brazil. One high ore-grade and one low ore-grade CRM (or medium grade) in each analytical batch of 40 samples (5%). A minimum of two blanks inserted in each batch mainly after mineralized zones. The control sample assay results of the internal QA/QC program were monitored, including the CRMs, pulp duplicates and sizing checks during preparation. Additionally, systematic checks of the digital database were conducted against the original signed Certificates of Analysis from the laboratory.
30
| Management’s Discussion and Analysis
|
Borborema
Introduction
Located in Currais Novos, Rio Grande do Norte, Brazil, the Borborema Project (“Borborema”) is an open pit gold mine owned by Aura, which holds 100% of Borborema Inc. A Feasibility Study announced on August 30, 2023, outlined production of 748,000 ounces of gold over an 11.3-year life of mine, with potential expansion and increased mineral reserves after relocating the federal highway. Following board approval in September 2023, construction began. In March 2025, Aura announced the start of the ramp-up phase of Borborema.
Operating performance
The table below sets out selected operating information for Borborema for the three months ended June 30, 2025, and 2024:
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |
| Ore mined (tonnes) | 899,634 | - | 899,634 | - |
| Waste mined (tonnes) | 2,612,250 | - | 2,612,250 | - |
| Total mined (tonnes) | 3,511,884 | - | 3,511,884 | - |
| Waste to ore ratio | 2.90 | - | 2.90 | - |
| Ore plant feed (tonnes) | 145,418 | - | 145,418 | - |
| Grade (g/tonne) | 0.70 | 0.70 | ||
| Recovery (%) | 77% | - | 77% | - |
| Production (ounces)¹ | 2,577 | - | 2,577 | - |
| Sales (ounces)¹ | 1,190 | 1,190 | ||
| - | - | |||
| Average cash operating cost (US$/oz) | 936 | - | 936 | - |
| All In Sustaining costs (US$/oz) | 1,441 | - | 1,441 | - |
Borborema produced its first gold pour in June 2025. Aura believes that Borborema remains on track to achieve commercial production by the end of Q3 2025.
For an analysis of the AISC (US$/GEO) in the period, please consult Section 4: Operational Highlights.
Strategic Developments and Geology
In Q2 2025, a drone-borne magnetometry survey began over the Borborema Mine, its surroundings, and extensions. This low-altitude survey (~30–40 m height) aims to identify the magnetic signature of the Borborema ore and similar potential anomalies in the SW and NE extensions of the mine. To date, the survey has covered about 32% of the planned block, with 270.66 linear kilometers flown out of a total of 830 linear kilometers. The acquired data has shown good quality and will be processed and interpreted at the end of the survey to identify potential anomalies.
Additionally, once the drone-mag survey is completed, follow-up will be conducted over geophysical anomalies potentially identified. This will include mapping, rock sampling, and trenching to verify possible extensions of the Borborema mineralization.
Matupá Project
The Matupá Project encompasses an area surrounding the municipalities of Matupá and Guarantã do Norte, approximately 700 km north of Cuiabá, the Mato Grosso State capital, and 200 km north of Sinop, an important commercial center and fourth largest city in the state in terms of total population.
31
| Management’s Discussion and Analysis
|
Aura acquired the project in 2018 as a result of the merger with Rio Novo Gold Inc. and restarted exploration activities in 2019. The project was owned by Vale from 1999 to 2006, and in 2003, the X1 anomalous area was discovered through initial diamond core drilling.
The Company has increased its mineral rights from 28,674 hectares (2020-2021) to 62,506 hectares currently, holding the mineral rights for nine properties, of which three cover an area of 15,000 hectares located within the existing mining concession (X1, Guarantã Ridge and Serrinhas deposits). Another six properties totaling 47,000 hectares are under an Exploration Permit, all in the prolific Juruena-Teles Pires Gold Province, where many gold deposits and occurrences exist.
In May 2024, Aura announced the acquisition of exploration rights for the Pé Quente and Pezão Projects, located in the Alta Floresta Gold Province, Mato Grosso, Brazil. The acquisition includes 6 Mineral Rights and is situated within 50 km from the X1 deposit. The projects have the same type of mineralization, offering potential to increase the Mineral Resources and Mineral Reserves of the Matupá Project. Aura made an initial payment of US$ 0.5 million and, if the results are satisfactory, may complete the acquisition in 2025 for US$9.5 million. In June 2025, Aura exercised its option to acquire 100% ownership of the Pé Quente project.
The Matupá project is located in a highly productive region, known for its abundant artisanal mining activities. While environmental licensing is underway for the X1 deposit, Aura has been conducting mineral exploration on targets within a 50 km radius that could increase the reserves and be processed at the same plant planned for X1. The main targets under development are Serrinhas, Pé Quente, and Pezão.
Strategic Developments and Geology
During Q2 2025, at the Matupá Project, Aura completed 25 diamond drill holes and advanced 3 additional diamond drill holes at the Pé Quente Target, totaling 4,919.2 meters. Initial exploration drilling also commenced at the Pezão Target, with one hole completed and one in progress, adding 410.4 meters.
Drilling activities remain focused on infill work at Pé Quente, targeting areas where the 2024 campaign confirmed robust mineralization potential (see Aura’s May 22 press release: “Aura Announces Acquisition of Pé Quente and Pezão Projects, Aiming to Add Mineral Resources and Reserves to the Nearby Matupá Project”). This infill program is expected to conclude by year-end, providing a foundation for an updated Mineral Resource estimate.
The best intercepts were:
| • | Hole FPQD-0050 intersected 0.32g/t Au over 15m. |
| • | Hole FPQD-0055 intersected 2.21g/t Au over 22.4m. |
| • | Hole FPQD-0059 intersected 1.37g/t Au over 24.95m. |
| • | Hole FPQD-0064 intersected 0.75g/t Au over 83m. |
| • | Hole FPQD-0079 intersected 0.91g/t Au over 81m. |
| Hole | X | Y | Z | Depth (meters) | Dip (degrees) | Az (degrees) | From (meters) | To (meters) | Length (meters) | Au (g/t) |
| FPQD-0050 | 740082 | 8853180 | 267 | 251 | -50 | 200 | 0.0 | 15.0 | 15.0 | 0.32 |
| 87.0 | 88.0 | 1.0 | 1.39 | |||||||
| FPQD-0055 | 739847 | 8853085 | 271 | 80 | -55 | 340 | 42.4 | 64.8 | 22.4 | 2.21 |
| FPQD-0056 | 738191 | 8852548 | 283 | 165 | -75 | 0 | 93.9 | 109.0 | 15.2 | 0.33 |
| 111.0 | 139.3 | 28.3 | 0.49 | |||||||
| 118.0 | 121.0 | 3.0 | 1.10 | |||||||
| 136.0 | 139.3 | 3.3 | 1.01 |
32
| Management’s Discussion and Analysis
|
| FPQD-0057 | 738468 | 8852497 | 276 | 111 | -55 | 0 | 7.0 | 26.0 | 19.0 | 0.39 |
| 23.0 | 24.0 | 1.0 | 1.41 | |||||||
| 88.0 | 101.0 | 13.0 | 0.36 | |||||||
| 88.0 | 92.0 | 4.0 | 0.87 | |||||||
| FPQD-0058 | 739892 | 8853290 | 265 | 190 | -60 | 20 | 1.0 | 4.0 | 3.0 | 1.49 |
| FPQD-0059 | 738422 | 8852464 | 276 | 166 | -45 | 0 | 0.0 | 6.0 | 6.0 | 0.49 |
| 80.0 | 153.8 | 73.8 | 0.69 | |||||||
| 128.0 | 153.0 | 25.0 | 1.37 | |||||||
| 148.0 | 153.0 | 4.9 | 2.43 | |||||||
| FPQD-0061 | 739735 | 8852880 | 274 | 80 | -45 | 350 | 47.0 | 57.0 | 10.0 | 0.39 |
| 55.0 | 57.0 | 2.0 | 1.63 | |||||||
| FPQD-0064 | 738757 | 8852826 | 270 | 131 | -55 | 260 | 4.0 | 87.0 | 83.0 | 0.75 |
| 4.0 | 5.3 | 1.3 | 2.48 | |||||||
| 35.0 | 44.0 | 9.0 | 2.57 | |||||||
| 48.0 | 50.8 | 2.8 | 2.14 | |||||||
| 58.7 | 74.0 | 15.3 | 0.91 | |||||||
| 85.0 | 87.0 | 2.0 | 1.13 | |||||||
| FPQD-0065 | 738318 | 8852424 | 281 | 70 | -60 | 180 | 21.0 | 24.0 | 3.0 | 1.47 |
| FPQD-0066 | 739991 | 8852917 | 277 | 200 | -50 | 335 | 115.0 | 124.0 | 9.0 | 0.32 |
| FPQD-0068 | 738683 | 8852750 | 270 | 122 | -55 | 300 | 3.0 | 14.0 | 11.0 | 0.35 |
| 3.0 | 4.0 | 1.0 | 1.09 | |||||||
| 9.0 | 10.0 | 1.0 | 1.05 | |||||||
| FPQD-0074 | 738132 | 8852097 | 278 | 300 | -65 | 0 | 44.0 | 45.0 | 1.0 | 1.85 |
| 191.0 | 201.6 | 10.6 | 0.43 | |||||||
| 200.8 | 201.6 | 0.8 | 1.22 | |||||||
| FPQD-0079 | 738805 | 8852844 | 271 | 157 | -55 | 320 | 38.0 | 119.0 | 81.0 | 0.91 |
| 60.0 | 61.0 | 1.0 | 1.39 | |||||||
| 66.9 | 69.0 | 2.1 | 2.45 | |||||||
| 72.0 | 73.6 | 1.6 | 2.01 | |||||||
| 77.0 | 78.0 | 1.0 | 20.10 | |||||||
| 80.0 | 86.0 | 6.0 | 1.01 | |||||||
| 94.0 | 95.0 | 1.0 | 8.01 | |||||||
| 98.0 | 99.0 | 1.0 | 7.61 | |||||||
| 118.4 | 119.0 | 0.6 | 6.02 |
*All reported grades are over apparent thickness
Aura also prepared approximately 750 kg of samples from Guarantã Ridge, Serrinhas, and Pé Quente Target to submit for metallurgical testing to check potential opportunities to share the same plant of X1 deposit.
Quality Assurance and Quality Control (“QA/QC”)
Matupa’QA/QC program requires that the following minimum number of control samples be inserted into the drilling samples being submitted to SGS Geosol Lab (“SGS”), in Belo Horizonte, Brazil. At Matupá, Aura implemented a QA/QC control program for drilling, trenching and channel sampling which includes high grade standard, medium grade standards or low-grade standard, and one Blank in each batch (mainly after mineralized zones) and 1/20 core duplicate (5%); Blank sample are fragments of regional barren granodiorite without any hydrothermal alteration or sulfides.
33
| Management’s Discussion and Analysis
|
Currently Aura uses the Certified Reference ITAK 528,529, 575, 639 and 652 for gold samples, which was prepared by TAK lab following their internal standards. The reference material was prepared using natural gold ore from Brazil, and the raw material was dried at a temperature of 105 °C, crushed, pulverized and homogenized. After homogenization, the material was fourth in aliquots of approximately 60g. Then they were evaluated on the degree of homogeneity for Au. Finally, a group of 09 specialized laboratories was invited to perform the certification tests of the parameter gold.
For Copper samples Aura uses Certified Reference SG-091, SG-092 and SG-093 which was prepared by SGS GEOSOL lab following their internal standards. The reference material was prepared using copper ore samples from Bahia, Brazil and the raw material was dried in an oven at 105ºC for over twelve hours, pulverized down to 75 microns, homogenized aliquots of 10 grams selected at random was then subjected to XRF analysis at SGS GEOSOL, followed by consensus testing to ensure homogeneity. and split into 372 aliquots of 120 grams, which were individually packed in airtight plastic jars. A subset of twenty- four aliquots of 10 grams selected at random was then subjected to XRF analysis at SGS GEOSOL, followed by consensus testing to ensure homogeneity.
Aura is not implanting any QA/QC samples for surface sampling (including soil, stream sediment or chip samples) in exploration projects.
Pé Quente QA/QC Measures
Quality Assurance and Quality Control Analytical work was carried out by SGS Lab, Geosol Laboratory in Vespasiano, Minas Gerais, Brazil. Drill core samples were crushed, pulverized and homogenized at SGS Geosol laboratory in Goiânia, Goias, Brazil, then pulp samples were shipped to SGS Lab in Vespasiano. All samples were analyzed for gold values determined by fire assay method (code FAA505) with atomic absorption spectrometry finish on 50g aliquots. SGS has routine quality control procedures which ensure that every batch of 20 prepared samples includes one sample repeat, three commercial standards, and blanks. SGS QA/QC measures are independent of Aura. Aura established a standard QA/QC procedure for the drilling programs at Serrinhas by inserting one blank, one standard, and one duplicate for every 40 samples.
Carajás QA/QC Measures
Drill core was sawed in the Project core shed and shipped to ALS, in Parauapebas, Pará-Brazil, where the samples were crushed, pulverized and homogenized, then pulp samples were sent to ALS Laboratory, in Lima-Peru, to conduct the analytical works, and analyze them for Gold using Fire Assay (Atomic Absorption – fusion 50 g aliquots) and ME-ICP61 analysis for determination of up to 34 elements by ICP/Digestion with aqua regia. For samples with Copper grades higher than 10,000 ppm, the analysis ME-OG62 was applied. The remaining coarse and pulverized rejection of the samples were returned to the Project facility for storage.
Aura Carajás had routine quality control procedures which ensured that every batch included five percent of commercial standard (high, medium or low grade), and five percent of blank sample. ALS laboratory has its own routine quality control procedures which ensured the insertion of blanks, commercial standards and duplicates into each batch of samples to be analyzed. All analytical results and certificates from both laboratories were provided separately and digital copies of the files were stored in the digital database.
For a complete description of Aura’s sample preparation, analytical methods and QA/QC procedures, please refer to 2023 AIF and the applicable Technical Report, a copy of which is available on the Company’s SEDAR profile at www.sedar.com.
Exploration Initiatives in Other Assets
Carajás (“Serra da Estrela project"): The project is located in the State of Pará, Brazil, in the Carajás Mineral Province, which is one of the most important polymetallic districts in the world and hosts several IOCG deposits such as Sossego and Salobo Mines (owned by Vale), Pedra Branca, Igarapé Bahia-Alemão, Cristalino, Gameleira and Alvo 118. The project includes IOCG (iron oxide gold copper) type of mineralization targets along a 6 km strike with a surface anomaly (up to 500 ppm Cu).
34
| Management’s Discussion and Analysis
|
During Q2 2025, the work continues being concentrated in interpretation of 2023-2024 drilling results and 2025 plan activities. The holes confirmed the continuity of mineralization along the 6 km strike with 3 main zones identified (Trend S, Trend SW, Trend N – Regional,) highlighting the promising potential of the target, and an infill drilling in this zone is planned for 2025. A total approximately 12,000 meters budgeted for Serra da Estrela Project that plan to start early Q3, 2025.
As part of the exploration program to generate new high-potential targets, a surface geochemical sampling is ongoing over the Regional, Central, and SW target areas. A total of 1,185 soil samples were collected, including 122 at the Regional Target and 1,063 across the Central and SW Targets.
Preliminary results from the magnetic susceptibility grids revealed positive anomalies extending approximately 1.8 km along a NE-SW trend in the northern portion (Regional Target). Additionally, magnetic trends observed in the Central and SW Targets were confirmed to extend further southwest, covering the southernmost portion of the license area.
These findings reinforce the prospective potential of the evaluated zones, particularly in areas not yet tested by drilling, and will guide the next steps of the exploration campaign in Serra de Estrela.
Tolda Fria (“Tolda Fria project"): The project is located in Caldas State, Colombia and has a total of 6,624 hectares in mineral rights. This property contains significant high-grade mineralization in the so-called Manizales - Villamaría Mining District, in the department of Caldas, Colombia. It is located within a particularly defined geological context, in which some particularities have been preliminarily established, such as deposit formed near the surface with ore zones containing average Au/Ag concentrations and some enrichment in Cu-Pb-Zn-As base metals at depth.
Currently, the property is in an overlaid area (Regional Forest Reserve); to resolve this situation, a request has been submitted to the Colombian authorities to delimit the area, through a technical report based on biotic, physical and socio-economic aspects.
During Q2, 2025 work has focused on the preparation and submission of the technical report, to be evaluated and approved by the Colombian environmental authority.
8. RESULTS OF OPERATIONS
Details of the Company´s expenses are presented below:
Exploration expenses(US$ thousand)
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |
| Minosa | (264) | - | (500) | (1) |
| Almas | (423) | - | (660) | - |
| Apoena | (62) | (122) | (186) | (170) |
| Aranzazu | (794) | (1,656) | (1,503) | (2,766) |
| Borborema | - | - | (70) | - |
| All other segments | (171) | (1,173) | (171) | (1,956) |
| Total | (1,714) | (2,951) | (3,090) | (4,893) |
In Q2 2025, exploration efforts were under way in most of the Company’s properties, part of which was capitalized and therefore not recognized as exploration expenses.
35
| Management’s Discussion and Analysis
|
General and administrative (“G&A”) expenses
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |
| Salaries, wages, benefits and bonus | (5,047) | (3,582) | (8,827) | (7,002) |
| Professional and consulting fees | (2,111) | (1,278) | (4,159) | (2,878) |
| Legal fees | (214) | (150) | (458) | (379) |
| Insurance | (194) | (240) | (390) | (626) |
| Directors' fees | (584) | (145) | (1,255) | (299) |
| Travel expenses | (213) | (218) | (574) | (437) |
| Share-based payment expense | - | - | (73) | (52) |
| Depreciation and amortization | (335) | (564) | (534) | (1,199) |
| Care and maintenance | (563) | (375) | (1,063) | (796) |
| Other | (2,023) | (979) | (3,587) | (2,142) |
| Total | (11,284) | (7,531) | (20,920) | (15,810) |
G&A expenses in Q2 2025 increased when compared to the same period of 2024, primarily due to: i) increase in professional and consulting fees, mainly due to an increase in audit fees in the quarter related to the project of listing the Company’s shares on Nasdaq; ii) increase in the fair value of DSU securities held by a Director of the Company, as result of the increase in the share price of Aura in the period; and iii) salaries and benefits increase due to the addition of Era Dorada, start of ramp-up operations at Borborema and annual bonus payments paid in Q2 2025.
Finance income/(expense)
(US$ thousand)
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |
| Accretion expense | (1,134) | (1,573) | (2,800) | (3,106) |
| Lease interest expense | (161) | (2,012) | (1,756) | (4,021) |
| Interest expense on loans and debentures | (6,098) | (4,121) | (11,853) | (8,338) |
| Finance cost on post-employment benefit | (747) | (467) | (1,085) | (834) |
| Unrealized gain (loss) on gold hedges | (24,304) | (11,558) | (124,514) | (13,522) |
| Realized gain (loss) on gold hedges | (11,703) | - | (17,739) | - |
| Loss on other derivative transactions | (1,305) | - | (3,132) | (33,226) |
| Change in liability measures at fair value | (4,025) | (954) | (6,384) | (3,587) |
| Foreign exchange | (2,462) | (11,184) | (5,638) | (13,274) |
| Derivative fee | - | (13,522) | ||
| Loss on settlement of liability with equity instruments | (8,768) | - | (8,768) | - |
| Other interest and finance costs | (297) | (140) | (727) | (571) |
| Finance expenses | (61,004) | (45,531) | (184,396) | (80,479) |
| Interest Income | 1,374 | 429 | 3,155 | 1,282 |
| Finance income | 1,374 | 429 | 3,155 | 1,282 |
| Total finance result | (59,630) | (45,102) | (181,241) | (79,197) |
| · | Unrealized loss on gold hedges in Q2 2025 arise from mark-to-market (MTM) adjustments related to outstanding gold hedge positions, reflecting increase in gold prices between the start and the end of the quarter, which closed the quarter at US$3,288.57 per Oz, coming from US$2,861.93 per Oz on March 31, 2025. In accordance with IFRS standards, the Company records MTM adjustments at the end of each reporting period for all outstanding derivative positions. |
36
| Management’s Discussion and Analysis
|
| · | Realized losses with gold hedges in Q2 2025 were related to cash settlement of outstanding gold collars during the quarter, driven by the expiration of gold collars within the quarter. |
| · | Non-cash loss of US$8,768 related to the settlement of the Nemesia SARL debt, as described above, with equity instruments, reflecting the difference between the fair value of the shares issued and the carrying amount of the debt acquired in the Bluestone transaction at the closing of the transaction. |
Most of Aura’s outstanding gold collars (225,996 Ozs out of about 234,598 Ozs) are associated with the future production of the Borborema Project and will expire between Jul/2025 and Jun/2028. As previously disclosed, about 80% of the production of the first 3 years of the Borborema Project is hedged at ceiling prices of US$2,400.
9. SUMMARY OF QUARTERLY AND ANNUAL RESULTS
The following table sets forth selected unaudited interim consolidated financial information for each of the eight most recently completed quarters.
(US$ thousand )
| Quarter ended June 30, 2025 | Quarter ended March 31, 2025 | Quarter ended December 31, 2024 | Quarter ended September 30, 2024 | Quarter ended June 30, 2024 | Quarter ended March 31, 2024 |
Quarter ended December 31, 2023 |
Quarter ended September 30,
2023 |
Quarter ended June 30, 2023 |
Quarter ended March 31, 2023 | |
| Net Revenue | 190,436 | 161,804 | 171,517 | 156,157 | 134,411 | 132,078 | 124,322 | 110,635 | 84,950 | 96,987 |
| Net current assets (liability) (a) | 39,581 | 49,658 | 141,171 | (117,893) | 32,727 | 88,710 | 181,542 | 88,592 | 12,314 | 25,288 |
| Property, plant and equipment | 762,566 | 720,466 | 610,784 | 560,993 | 516,742 | 504,598 | 488,733 | 481,664 | 425,081 | 396,591 |
| (Loss) Income for the period | 8,147 | (73,249) | 15,574 | (11,923) | (25,775) | (9,217) | (5,908) | 7,759 | 11,369 | 18,660 |
| (Loss) Income per share | ||||||||||
| Basic ($) | 0.11 | (0.99) | 0.23 | (0.16) | (0.36) | (0.13) | 0.23 | 0.11 | 0.16 | 0.26 |
| Diluted ($) | 0.11 | (0.99) | 0.23 | (0.16) | (0.35) | (0.13) | 0.23 | 0.11 | 0.16 | 0.26 |
10. LIQUIDITY AND CAPITAL RESOURCES
Management of the Company believes that Aura’s ongoing operations and associated cash flows will provide sufficient liquidity to continue financing its planned growth in the near term and that the Company will have access to additional debt as it grows to support further expansion.
The Company will, from time to time, repay balances outstanding on its revolving credit with operating cash flow and cash flow from other sources.
The changes in the Company’s cash position during the second quarter of 2025 and 2024 were as follows:
(US$ thousand)
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |
| Net cash generated by operating activities | 79,864 | 53,612 | 121,092 | 79,464 |
| Net cash used in investing activities | (50,764) | (22,261) | (121,027) | (53,278) |
| Net cash used in financing activities | (55,748) | (42,244) | (100,472) | (57,076) |
| (26,647) | (10,893) | (100,406) | (30,891) |
The charts below show the change in cash position for the three and six months ended June 30, 2025, from a managerial perspective.
37
| Management’s Discussion and Analysis
|

Note: Adjusted Capex includes Sustaining and Exploration Capex
11. CONTRACTUAL OBLIGATIONS
Except as set forth in this MD&A, for the quarter ended June 30, 2025 and as at the date of this MD&A, the Company has not entered into any contractual obligations that are outside of the ordinary course of business.
The Company has the following future liabilities and payables:
| As of June 30, 2025 (US$ thousand) | Within 1 year | 2 to 3 years | 4 to 5 years | Over 5 years | Total | |||||||||||||||
| Trade and other payables | 111,155 | — | — | — | 111,155 | |||||||||||||||
| Loans and debentures | 90,580 | 248,039 | 159,208 | 26,160 | 523,987 | |||||||||||||||
| Provision for mine closure and restoration | 3,434 | 4,189 | 11,367 | 56,109 | 75,099 | |||||||||||||||
| Lease liabilities | 12,454 | 11,478 | 105 | 42 | 24,079 | |||||||||||||||
| Liability measured at fair value | 4,850 | 3,381 | 6,482 | 25,963 | 40,676 | |||||||||||||||
| 222,473 | 267,087 | 177,162 | 108,274 | 774,996 | ||||||||||||||||
38
| Management’s Discussion and Analysis
|
12. RELATED PARTY TRANSACTIONS
Key Management Compensation
Total compensation paid to key management personnel (including based salaries, bonuses and other benefits), remuneration of directors and other members of key executive management personnel for the period ended June 30, 2025 and 2024 were US$2,718 and US$2,981, respectively.
Director’s fees
Management had issued 189,795 deferred stock units (DSUs) to certain directors and former directors of the Company in 2016. The DSUs are recognized at the fair value of the Company shares based on the provisions of the agreements and will be settled in cash. The balance of the DSUs as of June 30, 2025 is US$2,197 (US$1,216 as of December 31, 2024) and is included as part of Trade and other payables.
Irajá Royalty Payments - Apoena
As part of the Apoena Mines transaction with Yamana Gold Inc. (“Yamana”), Mineracao Apoena S.A. (“Apoena”) entered into a royalty agreement (the “EPP Royalty Agreement”), dated June 21, 2016, with Serra da Borda Mineracao e Metalurgia S.A. (“SBMM”), Yamana’s wholly-controlled subsidiary. Commencing on and from June 21, 2016, Apoena would pay to SBMM a royalty (the “Royalty”) that is equal to 2.0% of Net Smelter Returns on all gold mined or benefited from Apoena (the “Subject Metals”) sold or deemed to have been sold by or for Apoena.
Effective as at such time as Apoena has paid the Royalty on up to 1,000,000 troy ounces of the Subject Metals, the Royalty shall without the requirement for any further act or formality, reduce to 1.0% of Net Smelter Returns on all Subject Metals sold or deemed to have been sold by or for Apoena.
On October 27, 2017, SBMM entered into an agreement (the “Royalty Swap Agreement”) with Iraja Mineracao Ltda., a company controlled by the same controlling group, a third-party company, for the swap of the EPP Royalty with the RDM Royalty (as defined in the Royalty Swap Agreement) with no change to the terms of the royalty calculation. Aura has incurred expenses of the related royalties of US$1,548 in the period ended June 30, 2025 (US$909: 2024).
Irajá Royalty Payments - Almas
The Company, through its wholly owned subsidiaries Almas, maintains a royalty agreement with Irajá Mineração Ltda., a company controlled by the same controlling group of Aura, whereby the subsidiary pays 1.2% of the Net Smelter Returns on all gold mined or sold. Aura has incurred expenses of the related royalties of US$6,200 in the period ended June 30, 2025.
Royalty Agreement for Matupá
The Company, through its wholly owned subsidiary Matupá, maintains a royalty agreement with Irajá Mineração Ltda., a company controlled by the same controlling group of Aura, whereby the subsidiary will pay 1.2% of the Net Smelter Returns on all gold mined or sold, from the moment that is declared commercial production. The subsidiary is currently in care and maintenance.
Dividends payable to Northwestern
Northwestern, a company controlled by the Chairman of the Board, is the majority shareholder of Aura with approximately 53.5% ownership as of June 30, 2025 (54.8% as of December 31, 2024).
39
| Management’s Discussion and Analysis
|
In the six-month ended June 30, 2025, the Company paid to Northwestern the total amount of US$25.7 million of dividends.
Employee withholding taxes payable to the Company
In March 2021, certain key executives exercised stock options and received Company shares, triggering a withholding tax obligation that the Company paid on their behalf, as required by local regulations. The Board authorized reimbursement over a period of up to 18 months (extended to September 2025), with interest at or above the Applicable Federal Rate (AFR). The balance was secured by Company shares valued at 150% of the amount due, with provisions for additional collateral or immediate repayment in the event of employment termination. As of December 31, 2024, the outstanding balance was US$3,129, which was fully reimbursed by the executive in June 2025.
13. PROPOSED TRANSACTIONS
Acquisition of Mineração Serra Grande (“MSG”)
In June 2025, Aura announced a Transaction between AngloGold Ashanti and a wholly-owned subsidiary of Aura that have entered into a Share Purchase Agreement (“SPA”), which Aura will acquire from AngloGold all of the issued and outstanding securities of Mineração Serra Grande S.A. (“MSG”), owner of the MSG gold mine located in Crixás, in the state of Goiás, Brazil.
In consideration for the acquisition of MSG, Aura will pay to AngloGold: (i) an upfront cash consideration of US$76 million on closing subject to certain working capital adjustments as at the closing date; plus (ii) deferred consideration payments equivalent to a 3% net smelter returns participation over the currently identified Mineral Resource of MSG (inclusive of the Mineral Reserve) payable quarterly. The Transaction excludes certain current subsidiaries of MSG, which hold assets that do not form part of MSG’s mining operations or Mineral Resources and Mineral Reserves. These subsidiaries will be spun off from MSG prior to the closing of the Transaction. The Transaction is subject to the fulfilment of certain conditions precedent and expected to close during Q3 2025.
14. CRITICAL ACCOUNTING ESTIMATES
The preparation of the consolidated financial statements requires management to make estimates and judgements and to form assumptions that affect the reported amounts of assets and liabilities and disclosures of contingent liabilities. Management’s estimates and judgements are continually evaluated and are based on historical experience and other factors that management believes to be reasonable under the circumstances. Actual results may differ from these estimates.
The Company has identified critical accounting policies under which significant judgments, estimates and assumptions are made and where actual results could differ from these estimates under different assumptions and conditions and could materially affect the Company’s financial results or statements of financial position reported in future periods.
Please refer to Note 4 of the Annual audited consolidated financial statements for the year ended December 31, 2024 for a summary of the significant accounting estimates and judgements made in the preparation of the financial statements. Management’s estimates and judgements are continually evaluated and are based on historical experience and other factors that management believes to be reasonable under the circumstances. Actual or future results may differ from these estimates.
15. FINANCIAL INSTRUMENTS AND OTHER INSTRUMENTS
a) Financial Instruments
In accordance with IFRS 9, the Company records the fair value of their derivative fixed price contracts and put/call options instruments at the end of the reporting period as an asset (“in-the-money”) or liability (“out-of-the-money”). The fair
40
| Management’s Discussion and Analysis
|
value is calculated as the difference between a market-based price and the contracted price. At the end of the reporting period, a corresponding gain or loss is recorded in the Consolidated Statements of Income as Other (Gain) Loss. For the derivatives characterized as hedge accounting, the gain on loss is recorded through other comprehensive income.
For the fixed price contracts and put/call options on the gold derivatives, these derivatives are significantly driven by the market price of gold. As noted below section b, these derivatives are considered as Level 2 investments.
The group has the following derivative financial instruments in the following line items in the balance sheet:
| Asset/(Liability) at | Asset/(Liability) at | ||
| Derivatives Contracts | Current / Non-Current | June 30, 2025 | December 31, 2024 |
| Swap – Aura Almas | Non-current | 5,395 | (15,164) |
| Swap – Apoena Mines | Current | (4,587) | (3,872) |
| Gold Derivatives | Current and Non-Current | (244,968) | (120,454) |
| Total | (244,160) | (139,490) |
Gold Derivatives
a) - Derivative Zero Cost Collars - Almas and Apoena
As of June 30, 2025, the Company had 8,632 outstanding zero cost put/call collars for the Almas Project. The zero-cost put/calls collars have floor prices of US$1,558 (average: US$1,558) and ceiling prices between US$2,300 and US$2,300 (average: US$2,300) per ounce of gold. The expiration dates are between June 2025 and July 2025.
For Apoena Mines, as of June 30, 2025 Mineração Apoena S.A. had zero cost put/call collars for 3,750 ounces of gold with floor price of US$1,400 and ceiling price of US$2,100 per ounce of gold. The expiration dates are between June 2025 and December 2025.
b) – Derivative Collars Borborema Project
As of June 30, 2025, the Company had 225,996 ounces outstanding for the Borborema Project. The put/calls collars have floor prices of US$1,745 and ceiling prices at US$2,400 per ounce of gold expiring between July 2025 and June 2028.
The fair value effect of both the Derivative Zero Cost Collars and the Derivative Collars Borborema Project for the six-months ended June 30, 2025 and 2024 is (US$124,514) and (US$33,226) respectively, recorded as a finance expenses loss in the financial statements.
As of the date of these Unaudited Condensed Interim Financial Statements, the Company and its subsidiaries have no agreements in place with financial institutions which would require the Company to post cash or any other type of collateral to cover fair value exposure against the Company.
Fair value of financial instruments
In accordance with IFRS 9, the Company measures certain of its financials assets and liabilities at fair value on a recurring basis and these are classified in their entirety based on the lowest level of input that is significant to the fair value measurement. There are three levels of the fair value hierarchy that prioritize the inputs to valuation techniques used to measure fair value:
| · | Level 1,which are inputs that are unadjusted quoted prices in active markets for identical assets or liabilities; |
41
| Management’s Discussion and Analysis
|
| · | Level 2, which are inputs other than Level 1 quotes prices that are observable, either directly or indirectly, for the asset or liability; and, |
| · | Level 3, which are inputs for the asset or liability that are not based on observable market data. |
The Company measures certain of its financial assets and liabilities at fair value on a recurring basis and these are classified in their entirety based on the lowest level of input that is significant to the fair value measurement. Additionally, the Company classifies derivative assets and liabilities in Level 2 of the fair value hierarchy as they are valued using pricing models which require a variety of inputs such as expected gold price.
The fair value of the Company’s financial assets and liabilities measured at fair value on a recurring basis at June 30, 2025 and December 31, 2024 are summarized in the following table:
| June 30, 2025 | December 31, 2024 | |||||||||||||||||||
Level | Fair value through profit & loss | Fair value through OCI | Fair value through profit & loss | Fair value through OCI | ||||||||||||||||
| Assets | ||||||||||||||||||||
| Accounts receivable | 2 | — | — | 13,480 | — | |||||||||||||||
| Other receivables and assets | 1 | — | 2,419 | — | 3,482 | |||||||||||||||
| Derivative Financial Instrument | 2 | — | 5,395 | — | — | |||||||||||||||
| — | 7,814 | 13,480 | 3,482 | |||||||||||||||||
| Liabilities | ||||||||||||||||||||
| Debentures | 2 | 229,500 | — | 162,515 | — | |||||||||||||||
| Liability measured at fair value | 3 | 22,539 | — | 17,749 | — | |||||||||||||||
| Derivative Financial Instrument | 2 | 249,555 | — | 124,326 | 15,164 | |||||||||||||||
| Other provisions | 3 | 9,610 | — | — | — | |||||||||||||||
| 511,204 | — | 304,590 | 15,164 | |||||||||||||||||
16. DISCLOSURE CONTROLS AND INTERNAL CONTROLS OVER FINANCIAL REPORTING
Pursuant to regulations adopted by the Canadian Securities Administrators, The Company's management, with the participation of the Chief Executive Officer and Chief Financial Officer, are responsible for establishing, maintaining and evaluating the effectiveness of the internal control over financial reporting and disclosure controls and procedures.
The Company's internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with IFRS. Any system of internal control over financial reporting, no matter how well designed, has inherent limitations. These inherent limitations include the realities that judgements in decision making can be faulty, and that breakdowns can occur because of simple error or mistake. Additionally, controls can be circumvented by the actions of one individual, by collusion of two or more people, or by unauthorized override of the control. Therefore, even those systems determined to be effective can provide only reasonable assurance with respect to financial statement preparation and presentation.
For the three and six ended June 30, 2025, the Chief Executive Officer and the Chief Financial Officer concluded that Aura’ disclosure controls and procedures, and internal control over financial reporting are designed to provide reasonable assurance regarding the reliability of information disclosed in its filings, including its interim financial statements prepared in accordance with IFRS.
During the three and six months ended June 30, 2025, there were no changes in internal controls over financial reporting that have materially affected, or are reasonably likely to materially affect, the Company's internal controls over financial reporting.
42
| Management’s Discussion and Analysis
|
17. SUBSEQUENT EVENTS
U.S. Initial Public Offering (“IPO”)
On July 17, 2025, Aura announced the closing of its U.S. Initial Public Offering (“IPO”) of 8,100,510 common shares, at a public offering price of US$24.25 per common share. In addition to the listing, Aura intends to use the net proceeds from the offering to continue strengthening its business, which includes (A) funding the component of the upfront cash payment for the acquisition of Mineração Serra Grande S.A. (“MSG”), upon and subject to closing, and any potential incremental capital expenditures required at MSG, as well as (B) providing incremental liquidity and financial flexibility to support the execution of its current strategic growth initiatives, including, but not limited to: (i) the potential advancement of its current development projects, such as Era Dorada and Matupá; and (ii) exploration initiatives to expand mineral reserves and resources of its portfolio, and (C) the remainder for general corporate purposes.
The Company’s common shares began trading on the Nasdaq Global Select Market under the ticker symbol “AUGO” on July 16, 2025. In connection with the offering, Aura granted to the underwriters a 30-day option to purchase up to an additional 1,215,077 common shares at the public offering price, less underwriting discounts and commissions.
18. NON-GAAP PERFORMANCE MEASURES
Set out below are reconciliations for certain non-GAAP financial measures (including non-GAAP ratios) utilized by the Company in this MD&A: EBITDA; Adjusted EBITDA; cash operating costs per gold equivalent ounce sold; AISCs; realized average gold price per ounce sold, gross; Net Debt; and Adjusted EBITDA Margin, which are non-GAAP performance measures. These non-GAAP measures do not have any standardized meaning within IFRS and therefore may not be comparable to similar measures presented by other companies. The Company believes that these measures provide investors with additional information which is useful in evaluating the Company’s performance and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.
A. Reconciliation from income for the quarter to Adjusted EBITDA4:
(US$ thousand)
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |
| (Loss)/Profit for the period | 8,147 | (25,775) | (65,102) | (34,992) |
| Current tax | 29,551 | 14,612 | 50,365 | 24,755 |
| Deferred tax | (6,326) | 6,888 | (8,840) | 7,733 |
| Finance expense | 59,630 | 45,102 | 181,241 | 79,197 |
| Other (expense) income | (61) | (1) | 693 | 593 |
| Depletion and amortization | 15,283 | 15,346 | 29,346 | 32,090 |
| Adjusted EBITDA | 106,224 | 56,172 | 187,703 | 109,376 |
4 Adjusted EBITDA is a non-GAAP financial measure with no standardized meaning under IFRS, and therefore may not be comparable to similar measures presented by other issuers. For further information and detailed reconciliations to the most directly comparable IFRS measures, see Section 17: Non-GAAP Performance Measures in this MD&A.
43
| Management’s Discussion and Analysis
|
B. Reconciliation from the consolidated financial statements to cash operating costs per gold equivalent ounce sold:
(US$ thousand)
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |
| Cost of goods sold | (86,497) | (83,102) | (169,873) | (168,499) |
| Depletion and amortization | 14,948 | 14,782 | 28,812 | 30,891 |
| Subtotal | (71,549) | (68,320) | (141,061) | (137,608) |
| Gold Equivalent Ounces sold | 62,452 | 63,258 | 122,943 | 132,344 |
| Cash costs per gold equivalent ounce sold | 1,146 | 1,080 | 1,147 | 1,040 |
C. Reconciliation from the consolidated financial statements to all in sustaining costs per gold equivalent ounce sold :
(US$ thousand)
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |
| Cost of goods sold | (86,497) | (83,103) | (169,873) | (168,500) |
| Depletion and amortization | 14,948 | 14,782 | 28,812 | 30,891 |
| Subtotal | (71,549) | (68,320) | (141,061) | (137,608) |
| Adjusted capex | 13,993 | 8,774 | 26,044 | 21,189 |
| General and Administrative Expenses | 3,746 | 2,631 | 7,317 | 5,456 |
| Lease Payments | 1,226 | 4,273 | 4,449 | 8,680 |
| Subtotal | (64,003) | (61,416) | (126,721) | (123,472) |
| Gold Equivalent Ounces sold (in thousands) | 62,452 | 63,258 | 122,943 | 132,344 |
| All In Sustaining costs per ounce sold equivalent ounce sold | 1,449 | 1,328 | 1,455 | 1,307 |
(1) Refers to the G&A incurred by the 4 business units in production: Aranzazu, Apoena, Almas and Minosa, excluding depreciation and amortization and Corporate cost sharing expenses.
D. Reconciliation from the consolidated financial statements to realized average gold price per ounce sold, net5:
(US$ thousand)
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |
| Gold Revenue | 127,928 | 88,383 | 239,470 | 179,434 |
| Ounces of gold sold | 40,162 | 38,575 | 80,197 | 82,559 |
| Realized average gold price per ounce sold, net | 3,185 | 2,208 | 2,986 | 2,097 |
5 Realized average gold price per ounce sold, net is a non-GAAP financial measure with no standardized meaning under IFRS, and therefore may not be comparable to similar measures presented by other issuers. For further information and detailed reconciliations to the most directly comparable IFRS measures, see Section 17: Non-GAAP Performance Measures in this MD&A.
44
| Management’s Discussion and Analysis
|
E. Net Debt:
(US$ thousand)
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |
| Short Term Loans | 78,786 | 98,004 | 78,786 | 98,004 |
| Long-Term Loans | 375,107 | 236,413 | 375,107 | 236,413 |
| Plus / (Less): Derivative Financial Instrument for Debentures¹ | 5,395 | (45) | 5,395 | (45) |
| Less: Cash and Cash Equivalents | (167,938) | (191,963) | (167,938) | (191,963) |
| Less: Restricted cash | - | - | - | - |
| Less: Short term investments | - | - | - | - |
| Net Debt | 291,350 | 142,409 | 291,350 | 142,409 |
(1) Derivative Financial Instrument: only includes the swap related to the Aura Almas Debenture.
F. Adjusted EBITDA Margin6 (Adjusted EBITDA/Revenues):
(US$ thousand)
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |
| Net Revenue | 190,436 | 134,411 | 352,240 | 266,489 |
| Adjusted EBITDA | 106,224 | 55,797 | 187,703 | 108,602 |
| Adjusted EBITDA Margin (Adjusted EBITDA/Revenues) | 56% | 42% | 53% | 41% |
G. Adjusted Net Income
(US$ thousand)
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |
| Income/(Loss) for the period | 8,147 | (25,775) | (65,102) | (34,992) |
| Foreign exchange gain (loss) | (2,462) | (11,184) | (5,638) | (13,274) |
| Gain (loss) on derivative transactions | (24,304) | (11,558) | (124,514) | (33,226) |
| Loss on settlement of liability with equity instruments | (8,768) | - | (8,768) | - |
| Deffered taxes over non-monetary items | 6,847 | (12,447) | 10,081 | (11,472) |
| Adjusted Net Income | 36,834 | 9,414 | 63,737 | 22,980 |
19. RISK FACTORS
The operations of the Company contain significant risk due to the nature of mining, exploration, and development activities. For details of these risks, please refer to the risk factors set forth in the Company’s AIF which could materially affect the Company’s future operating results and could cause actual events to differ materially from those described in forward-looking information relating to the Company. See Section 21: Cautionary Note Regarding Forward-Looking Information.
6 Adjusted EBITDA Margin is a non-GAAP financial measure with no standardized meaning under IFRS, and therefore may not be comparable to similar measures presented by other issuers. For further information and detailed reconciliations to the most directly comparable IFRS measures, see Section 17: Non-GAAP Performance Measures in this MD&A.
45
| Management’s Discussion and Analysis
|
20. DISCLOSURE OF SHARE DATA
As of June 30, 2025, the Company had the following outstanding: 74,529,362 Common Shares, 1,500,992 stock options, and 189,795 deferred share units.
In subsequent events, during July 2025, the Company issued 8,100,510 common shares. Following these transactions, the Company has a total of 82,629,872 common shares outstanding as of the date of this MD&A date.
21. CAUTIONARY NOTES AND ADDITIONAL INFORMATION
This MD&A, and the documents incorporated by reference herein, contain certain “forward-looking information” within the meaning of applicable Canadian securities laws and “forward-looking statements” within the meaning of applicable United States securities laws (together, “forward-looking information”). Forward-looking information relates to future events or future performance of the Company and reflect the Company’s current estimates, predictions, expectations or beliefs regarding future events and include, without limitation, statements with respect to: expected production from, and the further potential of the Company’s properties; the ability of the Company to achieve its long-term outlook and the anticipated timing and results thereof (including the guidance set forth herein); the ability to lower costs and increase production; the economic viability of a project; strategic plans, including the Company’s plans with respect to its properties; the amount of mineral reserves and mineral resources; probable mineral reserves; indicated mineral reserves; inferred mineral reserves; the potential conversion of indicated mineral resources into mineral reserves; the amount of future production over any period; capital expenditures and mine production costs; the outcome of mine permitting; other required permitting; information with respect to the future price of minerals; expected cash costs and AISCs; the Company’s ability expand exploration on its properties; the Company’s ability to obtain assay results; the Company’s exploration and development programs; estimated future expenses; exploration and development capital requirements; the amount of mining costs; cash operating costs; operating costs; expected grades and ounces of metals and minerals; expected processing recoveries; expected time frames; prices of metals and minerals; LOM of certain projects; expectations of gold hedging programs; the implementation of cultural initiatives; expected increases to fleet capacities; non-cash losses translating into cash losses; the ability to continue to finance planned growth; access to additional debt; and the repayment of outstanding balances on revolving credit facilities. Often, but not always, forward-looking information may be identified by the use of words such as “expects”, “anticipates”, “plans”, “projects”, “forecasts”, “estimates”, “assumes”, “intends”, “strategy”, “goals”, “objectives” or variations thereof or stating that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative of any of these terms and similar expressions.
Forward-looking information is necessarily based upon a number of estimates and assumptions that, while considered reasonable by the Company, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Forward-looking information in this MD&A is based upon, without limitation, the following estimates and assumptions: the ability of the Company to successfully achieve business objectives; the presence of and continuity of metals at the Company’s projects at modeled grades; gold and copper price volatility; the capacities of various machinery and equipment; the availability of personnel, machinery and equipment at estimated prices; exchange rates; metals and minerals sales prices; cash costs and AISCs; the Company’s ability to expand operations; the Company’s ability to obtain assay results; appropriate discount rates; tax rates and royalty rates applicable to the mining operations; cash operating costs and other financial metrics; anticipated mining losses and dilution; metals recovery rates; reasonable contingency requirements; the Company’s expected ability to develop adequate infrastructure and that the cost of doing so will be reasonable; the Company’s expected ability to develop its projects including financing such projects; and receipt of regulatory approvals on acceptable terms.
Known and unknown risks, uncertainties and other factors, many of which are beyond the Company’s ability to predict or control, could cause actual results to differ materially from those contained in the forward-looking information. Specific reference is made to the Company’s most recent AIF for a discussion of some of the factors underlying forward-looking information, which include, without limitation: gold and copper or certain other commodity price volatility; changes in debt and equity markets; the uncertainties involved in obtaining and interpreting geological data; increases in costs;
46
| Management’s Discussion and Analysis
|
environmental compliance and changes in environmental legislation and regulation; interest rate and exchange rate fluctuations; general economic conditions; political stability; and other risks involved in the mineral exploration and development industry. Readers are cautioned that the foregoing list of factors is not exhaustive of the factors that may affect the forward-looking information.
All forward-looking information herein is qualified by this cautionary statement. Accordingly, readers should not place undue reliance on forward-looking information. The Company undertakes no obligation to update publicly or otherwise revise any forward-looking information whether as a result of new information or future events or otherwise, except as may be required by law. If the Company does update any forward-looking information, no inference should be drawn that it will make additional updates with respect to such or other forward-looking information.
Industry and Market Data
This MD&A includes market, industry and economic data which was obtained from various publicly available sources and other sources believed by the Company to be true. Although the Company believes it to be reliable, the Company has not independently verified any of the data from third party sources referred to in this MD&A or analyzed or verified the underlying reports relied upon or referred to by such sources, or ascertained the underlying economic and other assumptions relied upon by such sources. The Company believes that its market, industry and economic data is accurate and that its estimates and assumptions are reasonable, but there can be no assurance as to the accuracy or completeness thereof. The accuracy and completeness of the market, industry and economic data used in this MD&A are not guaranteed, and the Company does not make any representation as to the accuracy or completeness of such information.
Note to United States Investors Concerning Estimates of Indicated and Inferred Mineral Resources
This MD&A refers to estimated mineral reserves and mineral resources, including inferred mineral resources, indicated mineral resources, measured mineral resources, probable mineral reserves and proven mineral reserves. The mineral reserve estimates were prepared in accordance with Subpart 1300 of Regulation S-K, or “S-K 1300,” using geostatistical and/or classical methods, plus economic and mining parameters appropriate to the deposit. The estimates include mining dilution and mining recovery. Mining dilution and recovery factors vary with specific reserve sources and are influenced by several factors including deposit type, deposit shape and mining methods. The estimate of mineral reserves and mineral resources may be materially affected by environmental, permitting, legal, marketing, or other relevant issues 51 #100738255v1 Management’s Discussion and Analysis Our disclosure relating to exploration results, mineral resources, mineral reserves and exploration targets is based on supporting documentation prepared by qualified persons. Technical report summaries for each of our material mining operations have been prepared by qualified persons and have been filed as exhibits to our registration statement on Form F-1 filed with the U.S. Securities and Exchange Commission, or the “SEC”. The SEC maintains an Internet site that contains reports, proxy and information statements, and other information regarding issuers that file electronically with the SEC, including our technical report summaries. The SEC’s website is http://www.sec.gov.
Additional Information
Additional information relating to the Company, is available on SEDAR+ at www.sedarplus.com and on EDGAR at www.sec.gov/.
22. TECHNICAL DISCLOSURE
Unless otherwise stated in this MD&A, the technical and scientific information included herein has been derived from the following reports:
NI 43-101 technical reports:
| o | The technical report dated October 5, 2023, with an effective date of July 12, 2023, and entitled “Feasibility Study Technical Report (NI 43-101) for the Borborema Gold Project, Currais Novos Municipality, Rio Grande do Norte, Brazil”, prepared for Aura Minerals by Homero Delboni Jr., Ph.D., (MAusIMM – CP Metallurgy), Independent Senior Consultant (Metallurgy), Erik Ronald, (P.Geo.), Principal Consultant with |
47
| Management’s Discussion and Analysis
|
SRK (U.S.), Inc., Farshid Ghazanfari, (P.Geo.), Geology and Resource Director for Aura Minerals, and Bruno Yoshida Tomaselli, (FAusIMM), Mining Engineer employed as a Consulting Manager with Deswik Brazil;
| o | The technical report dated November 18, 2022, with an effective date of August 31, 2022, and entitled “Feasibility Study Technical Report (NI 43-101) for the Matupá Gold Project, Matupá Municipality, Mato Grosso, Brazil”, prepared for Aura Minerals by Farshid Ghazanfari, (P.Geo.), Geology and Resource Director for Aura Minerals, Luis Pignatari, (P. Eng.), EDE Mining Consultants (Engenharia de Minas ME), and Homero Delboni, Jr. Ph.D. (MAusIMM – CP Metallurgy), Independent Senior Consultant (Metallurgy); |
| o | The technical report dated March 10, 2021, with an effective date of December 31, 2020, and entitled “Updated Feasibility Study Technical Report For the Almas Gold Project, Almas Municipality, Tocantins, Brazil”, prepared for Aura Minerals by Farshid Ghazanfari, (P.Geo.), Geology and Resource Director for Aura Minerals, Terry Hennessey, (P.Geo), Senior Associate Geology with Micon International (Canada), Luis Pignatari, (P. Eng.), EDEM Mining Consultants (Engenharia de Minas ME), Robert Raponi, (P.Eng), Ausenco Principal Consultant (Metallurgy), Inna Dymov, (P.Eng), Independent Senior Consultant (Metallurgy), Adam Wheeler, (C.Eng) Adam Wheeler Mining Consultant Limited, and Porfirio Cabaleiro Rodriguez, (P.Eng), GE21 (Consultalria Mineral); |
| o | The technical report dated September 7, 2018, with an effective date of January 31, 2018, and entitled “Feasibility Study of the Re-Opening of the Aranzazu Mine, Zacatecas, Mexico”, prepared for Aura Minerals by Farshid Ghazanfari, P.Geo. (Farshid Ghazanfari Consulting), Adam Wheeler, C.Eng. (Independent Mining Consultant), Colin Connors, RM-SME (Aura Minerals Inc.), Robert Dowdell, C.Eng. (Dowdell Mining Limited), Paul Cicchini P.E. (Call & Nicholas, Inc.), G. Holmes, P.Eng. (Jacobs Engineering), B. Byler, P.E. (Wood Environment and Infrastructure Solutions), C. Scott, P.Eng. (SRK Canada), D. Lister, P.Eng. (Altura Environmental Consulting), and Fernando Cornejo, P.Eng. (Aura Minerals Inc.); |
| o | The Apoena Mines (EPP Complex) Technical Report dated March 31, 2024, with an effective date of October 31, 2023 was prepared for Aura Minerals by GE21 Ltda. and authored by Porfirio Cabaleiro Rodriguez, FAIG. (GE21 Mining Consultant), Luiz Eduardo Campos Pignatari, P.Eng. EDEM Mining Consultants (Engenharia de Minas ME) Farshid Ghazanfari, (P.Geo.), Geology and Resource Director for Aura Minerals, Homero Delboni Junior, Ph.D., (MAusIMM – CP Metallurgy), and Branca Horta de Almeida Abrantes, MAIG.(GE21 Mining Consultants). |
| o | The technical report dated July 2, 2014, with an effective date of December 31, 2013, and entitled “Mineral Resource and Mineral Reserve Estimates on the San Andrés Mine in the Municipality of La Union, in the Department of Copan, Honduras”, prepared for Aura Minerals by Bruce Butcher, (P.Eng.), former Vice President, Technical Services at Aura Minerals, Ben Bartlett, (FAusiMM), former Manager Mineral Resources at Aura Minerals, and Persio Rosario, (P. Eng.), former Principal Metallurgist at Aura Minerals; and |
| o | The technical report dated May 31, 2011, authored by W.J. Crowl, R. G. and Donald Hulse, P.Eng, and titled “NI 43-101 Report on The Tolda Fria Project, Manizales, Colombia”. |
S-K 1300 technical report summaries:
| o | The technical report summary, entitled “S-K 1300 Technical Report Summary on the Aranzazu Mine, Zacatecas, Mexico,” issued March 28, 2025, with an effective date of December 31, 2024, prepared by SLR Consulting (Canada) Ltd. SLR Consulting (Canada) Ltd is the qualified person under S-K 1300. |
| o | The technical report summary, entitled “S-K 1300 Technical Report Summary, San Andres Mine, Department of Copan, Honduras,” issued March 28, 2025, with an effective date of December 31, 2024, prepared by SLR Consulting (Canada) Ltd. SLR Consulting (Canada) Ltd is the qualified person under S-K 1300. |
| o | The technical report summary, entitled “Apoena Mine (EPP Complex) Mineral Resource and Mineral Reserve,” issued March 28, 2025, with an effective date of October 31, 2023, prepared by Porfirio Cabaleiro Rodriguez, Luiz Eduardo Campos Pignatari, Farshid Ghazanfari, Homero Delboni Junior, and Branca Horta de Almeida Abrantes as qualified persons under S-K 1300. Mr. Farshid Ghazanfari is the Geology and Mineral Resources Manager for the Company. |
48
| Management’s Discussion and Analysis
|
| o | The technical report summary, entitled “S-K 1300 Technical Report Summary, Almas Project, Tocantins State, Brazil,” issued April 10, 2025, with an effective date of December 31, 2024, prepared by SLR Consulting (Canada) Ltd. SLR Consulting (Canada) Ltd is the qualified person under S-K 1300. |
| o | The technical report summary, entitled “Technical Report Summary on the Feasibility Study for the Matupá Gold Project, Matupá Municipality, Mato Grosso, Brazil,” issued March 28, 2025, with an effective date of August 31, 2022, prepared by F. Ghazanfari. P. Geo. (Aura Minerals), L. Pignatari, P.Eng. (EDEM, 53 #100738255v1 Management’s Discussion and Analysis Consultants, Brazil), and H. Delboni Jr. P.Eng. (Independent Mining Consultant, Brazil) as qualified persons under S-K 1300. Mr. Farshid Ghazanfari is the Geology and Mineral Resources Manager for the Company. |
| o | The technical report summary, entitled “Feasibility Study Technical Report for the Borborema Gold Project, Currais Novos Municipality, Rio Grande do Norte, Brazil,” issued March 28, 2025, with an effective date of January 31, 2023, prepared by B. Tomaselli B.Sc., FAusIMM (Deswik, Belo Horizonte, Brazil), SRK Consulting (U.S.), Inc., Denver, USA., F. Ghazanfari. P. Geo. (Aura Minerals), and H. Delboni Jr. P.Eng. (Independent Mining Consultant, Brazil) as qualified persons under S-K 1300. Mr. Farshid Ghazanfari is the Geology and Mineral Resources Manager for the Company. |
| o | The technical report summary, entitled “S-K 1300 Technical Report Summary Initial Assessment, Era Dorada Gold Project, Jutiapa, Guatemala,” issued June 6, 2025, with an effective date of December 31, 2024, prepared by Porfirio Cabaleiro Rodriguez, Garth Kirkham and Dr. Homero Delboni Jr. as qualified persons under S-K 1300. Mr. Delboni Jr. is a Mining Engineer and Minerals Processing, Ph.D, in Minerals Processing and Chartered Professional (Metallurgy) of the Australasian Institute of Mining and Metallurgy (AusIMM #112813). |
Farshid Ghazanfari, P.Geo., Mineral Resources and Geology Director for Aura Minerals Inc., has reviewed and approved the scientific and technical information contained within this MD&A and serves as the Qualified Person as defined in NI 43-101 and S-K 1300. All NI 43-101 technical reports related to properties material to Aura are available on SEDAR+ at sedarplus.ca and all S-K 1300 technical report summaries related to properties material to Aura are available on www.sec.gov.
Readers are reminded that results outlined in the technical reports for each of these projects are preliminary in nature and may include inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves.
There is no certainty that the mine plans and economic models contained in any of the reports will be realized. Readers are further cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Readers are also advised to refer to the latest annual information form and technical reports of the Company as well as other continuous disclosure documents filed by the Company available at sedarplus.ca, for detailed information (including qualifications, assumptions and notes set out accordingly) regarding the mineral reserve and mineral resource information contained in this MD&A.
49
EXHIBIT 99.3

August 2025 To find, mine and provide the most important and essential ores that allow the world and mankind to create, innovate and prosper. Second Quarter 2025 Financial Results Presentation August 6, 2025

TSX:ORA | B3:AURA33 | OTCQX:ORAAF www.auraminerals.com 2 Forward - Looking Information This presentation contains “forward - looking information” and “forward - looking statements”, as defined in applicable securities laws (collectively, “forward - looking statements”) including the Private Securities Litigation Reform Act of 1995 which include, but are not limited to, statements with respect to the activities, events or developments that we expect or anticipate will or may occur in the future, including our guidance and targets . Known and unknown risks, uncertainties and other factors, many of which are beyond our ability to predict or control, could cause actual results to differ materially from those contained in the forward - looking statements . Specific reference is made to the most recent Annual Information Form on file with certain Canadian provincial securities regulatory authorities for a discussion of some of the factors underlying forward - looking statements, as well as Section 21 : Cautionary Note Regarding Forward - looking Information contained in the Company’s management’s discussion and analysis for the quarter ended June 30 , 2025 (the “MD&A”) . All forward - looking statements herein are qualified by this cautionary statement . Accordingly, readers should not place undue reliance on forward - looking statements . We undertake no obligation to update publicly or otherwise revise any forward - looking statements whether as a result of new information or future events or otherwise, except as may be required by law . If we do update one or more forward - looking statements, no inference should be drawn that it will make additional updates with respect to those or other forward - looking statements . Non - IFRS Financial Measures This presentation includes certain non - IFRS financial measures, including cash operating costs per gold equivalent ounce produced, net debt and Adjusted EBITDA, which are not recognized under IFRS and do not have a standardized meaning prescribed by IFRS . We present non - IFRS financial measures when we believe that the additional information is useful and meaningful to investors and to enhance investors’ overall understanding of our current financial performance and our prospects for the future . It is not intended to be considered separately from, or as a substitute for, our financial information prepared and presented in accordance with IFRS . Further details on non - IFRS financial measures and reconciliations to the nearest IFRS financial measure are provided in our Management’s Discussion and Analysis accompanying our financial statements filed from time to time on SEDAR at www . sedar . com Technical Information The technical information in this presentation has been approved and verified by Farshid Ghazanfari, P . Geo . , who is the Qualified Person as that term is defined under NI 43 - 101 and S - K 1300 for Aura . Specific reference is made to, and the technical information in this presentation should be read in conjunction with, Section 22 : Technical Information and the related technical disclosure contained in the MD&A, together with qualifications and assumptions set out therein . Readers are further cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability . All technical information relating to Aura’s properties and the Company’s mineral reserves and resources is available on SEDAR at www . sedar . com and EDGAR on www . sec . gov . Readers are also advised to refer to the latest annual information form and technical reports of the Company as well as other continuous disclosure documents filed by the Company available at www . sedar . com and www . sec . gov, for detailed information (including qualifications, assumptions and notes set out accordingly) regarding the mineral reserve and mineral resource information contained in the MD&A .

Second Quarter 2025 Results Operational Performance and Highlights

TSX:ORA | B3:AURA33 | OTCQX:ORAAF www.auraminerals.com Executive Summary – Q2 2025 Highlights 4 • Q 2 2025 production totaled 64 k GEO, + 7 % when compared to Q 1 2025 , and in line with our expectations . No change on guidance . • Another record high Adjusted EBITDA of US $ 106 million in Q 2 2025 , the fourth consecutive quarterly record reported by Aura, driven by gold prices ( $ 3 , 185 avg . in the quarter) and consistent production . In the LTM, Adjusted EBITDA reached US $ 344 MM , with an average gold market price of $ 2 , 812 / Oz . • AISC in the quarter reached US $ 1 , 449 /GEO a decrease by 1 % when compared to Q 1 2025 (US $ 1 , 461 /GEO), in line with the Company’s expectations . At constant Q 2 2024 metal prices, AISC would have been US $ 1 , 312 in the quarter . • Net income of US $ 8 million , despite non - cash losses related to the MTM of gold collars . Excluding the non - cash losses, Adjusted Net Income was US $ 37 million . • Borborema : Production totaled 2 , 577 GEO following the project’s first gold pour . We believe that Borborema is on track to declare commercial production by the end of Q 3 2025 . • Acquisition of Mineração Serra Grande (“MSG”), announced in June 2025 , progressing . Closing is expected during this Q 3 2025 . • Subsequent events : o IPO on Nasdaq : On July 17 , 2025 , Aura announced the closing of its U . S . Initial Public Offering (“IPO ”) of 8 , 100 , 510 common shares, raising a gross proceeds of US $ 196 million , not including the green shoe which remains exercisable by the underwriters for 30 days following the date of the prospectus . Aura expects the offer to contribute to the increase in its ADTV and to concentrate trading liquidity in the US market . Important investors, such as the Lundin family, participated in the IPO . o PEA of Era Dorada released on July 3 rd with average yearly production of 95 k Oz / year (first 4 y), 2 MM /OZ in M&I . , capex US $ 265 MM and unleveraged IRR 24 % and NPV of US $ 485 MM @ US $ 2 , 410 /Oz and room to further improve on the Feasibility Study to be released early 2026 o Aura has exercised its options to acquire 100 % ownership of the Pé Quente and Carajás Projects (formerly known as “Serra da Estrela”) in Brazil . o Dividends : Dividend of US $ 0 . 33 / share based on Q 2 2025 results, above our policy ; LTM yield of 7 . 4 % including share buyback . o Delisting decision from TSX announced, aiming at consolidating stock trading liquidity on Nasdaq

Advancing Safety Culture: Another quarter with no LTI across all Aura’s operations and projects Safety of our Employees Stability of our Structures The Company maintained a strong safety record with zero lost time incidents (“LTIs”) across all operations and projects during Q 2 2025 . Aura has now achieved 12 consecutive months without LTIs and recorded only one LTI over the last two and a half years across all sites including the construction of Borborema Project, underscoring the strength of Aura’s safety culture and commitment to protecting people . Borborema , our newest operational unit, reached a major safety milestone, celebrating 1 , 000 days without a LTI (equivalent to more than 4 million work hours - reflecting the maturity and engagement of the site’s workforce . During the quarter, Aura’s dams, waste dumps and heap leach pads that are currently in operation or that are on care and maintenance were all satisfactorily stable and comply with all current legislation . In June 2025 , Aura Minerals' tailings dams in operation in Brazil received the Declaration of Stability Condition, issued by an independent external consultant, in accordance with the country's legal requirement . Independent external consultants ( Geoconsultoria and GeoSafe ) carried out monthly assessments of the stability and safety conditions of all Aura's geotechnical structures in operation , and all currently have satisfactory stability conditions .

TSX:ORA | B3:AURA33 | OTCQX:ORAAF www.auraminerals.com Q2 2025 production reached 64k, on track to achieve 2025 Production Guidance 6 Quarterly Production 1 000 GEO 2 Quarterly Production by Business Unit 000 GEO 2 23 7 20 LTM 1. Includes ounces capitalized 2. Gold equivalent ounces, or GEO, is calculated by converting the production of silver and copper into gold using a ratio be twe en the prices of these metals and gold. The prices used to calculate it at such proportions are based on the weighted average price of each of the metals obtai ned from sales at the Aranzazu Complex during the relevant periods Aranzazu: Production increase compared to the previous quarter, resulting from higher grades and better recoveries, despite the increase in gold prices which negatively impacted the conversion to GEO. Apoena: Production was in line with expectations , primarily due to the mine’s investment phase. Minosa: Production totaled 18,039 GEO, up 2% when compared to the previous quarter, resulting from higher grades processed during the quarter due to mine sequencing.. Almas: Production was consistent driven by higher ore throughput and improved mine performance, what offset the lower grades in the period. Borborema: Production totaled 2,577 GEO following the project’s first gold pour. 49 65 69 68 64 68 66 60 64 228 234 236 251 266 269 267 259 259 Q2 2023 Q3 2023 Q4 2023 Q1 2024 Q2 2024 Q3 2024 Q4 2024 Q1 2025 20 22 9 8 18 18 13 13 3 Q1 2025 Almas Minosa Apoena 60 64 Aranzazu Q2 2025 Borborema Q2 2025

TSX:ORA | B3:AURA33 | OTCQX:ORAAF www.auraminerals.com Q2 2025 AISC 7 AISC 1 US$/GEO 2 • Almas: AISC of US$ 1,364 /GEO, decreased by 5% compared to Q2 2024, primarily driven by improved operational performance and higher ore throughput, along with lower Capex during the quarter. • Aranzazu : AISC was US$1,514 in the quarter, representing a 25% increase compared to the same period last year mainly due to differences in metal prices. At constant metal prices, AISC decreased by 3% when compared to Q2 2024, mainly due to higher grades and recoveries • Minosa: In Q2 2025 AISC increased by 12% when compared to Q2 2024, reaching US$1,292. The increase is driven by slightly lower stockpile due to higher rainfall levels during the period • Apoena: AISC was US$1, 751, a 11% decrease when compared to Q2 2024, mainly driven by higher increase in the proportion of costs capitalized as expansion capex, related to the Nosde pit. 1. This refers to All In Sustaining cash operating costs per gold equivalent ounce produced. It is a non - IFRS measure. See appli cable reconciliation to IFRS in our Management’s Discussion and Analysis accompanying our financial statements filed from time to t ime on Sedar+ at www.sedarplus.cam and EDGAR at www.sec.gov 2. Gold equivalent ounces, or GEO, is calculated by converting the production of silver and copper into gold using a ratio be twe en the prices of these metals and gold. The prices used to calculate it at such proportions are based on the weighted average price of each of the metals obtained from sales at the Aranzazu Complex during the relevant period. 1,311 1,287 1,328 1,292 1,372 1,461 1,449 Q4 2023 Q1 2024 Q2 2024 Q3 2024 Q4 2024 Q1 2025 • AISC ex - Apoena $1,399 • AISC at constant prices Q2 24: $1,312 Q2 2025

TSX:ORA | B3:AURA33 | OTCQX:ORAAF www.auraminerals.com On track for 2025 Guidance: Production, CC and on track to meet Annual Guidance 8 2025 Production, Cash Cost, AISC and Capex guidance vs. Actuals & 2025 Guidance 144 - 169 244 984 1,290 144 - 169 Production guidance Aura Consolidated thousand GEO 1,4 Cash cost 2, 4 per GEO 1 sold guidance Aura Consolidated $/ GEO AISC 3, 4 per GEO 1 sold guidance Aura Consolidated $/ GEO Capex guidance Aura Consolidated (not including new projects 5 ) $ million 1. Gold equivalent ounces, or GEO, is calculated by converting the production of silver and copper into gold using a ratio be twe en the prices of these metals and gold. The prices used to calculate it at such proportions are based on the weighted average pr ice of each of the metals obtained from sales at the Aranzazu Complex during the relevant period or projected for 2024 according to marke t c onsensus projections 2. This refers to cash operating costs per gold equivalent ounce sold 3. This refers to all in sustaining cost per gold equivalent ounce sold 4. It is a non - IFRS measure. See applicable reconciliation to IFRS in our Management’s Discussion and Analysis accompanying our financial statements filed from time to time on SEDAR+ at www.sedarplus.ca and EDGAR at www.sec.gov 5. Not including the development of Matupa or other expansionary projects in the 2025 Expansion Capex; if the Company’s Board of Directors approves new investments, the C ompany will inform the market and update is Expansion Capex guidance for 2025. 6. At Guidance Metal Prices 984 22 74 8 H1 2025 A 99 - 106 10 - 13 40 - 47 2025 Guidance New projects + Expansion Exploration Sustaining 102 149 - 167 266 1,374 1,078 124 266 H1 2025 A 2025 Guidance 300 1,146 1,080 H1 2025 A H1 2025 at Guidance metal prices 2025 Guidance 1,191 1,456 1,367 H1 2025 A H1 2025 at Guidance metal prices 2025 Guidance 1,492 1,374 1,078

TSX:ORA | B3:AURA33 | OTCQX:ORAAF www.auraminerals.com Borborema 9 • First Gold Pour Produced in June. • Production totaled 2,577 GEO in the Q2 2025. • Commercial production expected by Q3 2025. • Project completed in just 19 months with zero lost time incidents. • Demonstrates Aura’s focus on simple, scalable, and efficient operations. • Strong ESG profile: uses renewable energy and grey water from local municipality. • Upside potential from future reserve growth , tied to planned road relocation.

TSX:ORA | B3:AURA33 | OTCQX:ORAAF www.auraminerals.com Rodrigo pediu para incluirmos 1 slide sobre PEA Era Dorada Era Dorada ~200km between Era Dorada and Minosa ~160 km by road east - southeast of Guatemala City Nearest town is Asuncion Mita with a population of ~20,000 Connected by the Pan American Highway (mine site is 6km from the highway) • Indicated Mineral Resources of 1 . 9 million ounces of gold, assuming 6 . 35 million tonnes at 9 . 31 grams per tonne . • Total production of approximately 1 . 4 million ounces of gold over a 17 years Life of Mine (“LOM”) . • Average production of 91 k ounces of gold for the first 4 years . • Total initial implementation CAPEX of approximately US $ 264 million • Payback in approximately 3 . 5 years after the beginning of the operation . • After - tax Net Present Value (“NPV”) of US $ 485 million when using the weighted average consensus gold prices for the projected period of US $ 2 , 410 per ounce . • After - tax Project IRR of 24 % when using the weighted average consensus gold prices for the projected period . • US $ 1 , 072 . 4 /oz average Cash Cost . MITA GEOTHERMAL PROJECT – RENEWABLE PROJECT An advanced - stage and licensed to produce up to 50 megawatts of power Main assumptions used for the base : • Gold price (per ounce) : US $ 2 , 410 • Exchange rate (GTC/USD) : 7 . 75 • Guatemalan Government Royalty : ( % of gross revenues) : 5 % • Income taxes : 25 % • Discount rate : 5 %

Second Quarter and First Semester 2025 Results Financial Results

TSX:ORA | B3:AURA33 | OTCQX:ORAAF www.auraminerals.com 12 F ourth consecutive record - high Adjusted EBITDA of US $106 million and Net Debt was US$281 million at the end of Q2 2025 Consolidated Financials – Summary page Net Revenues in US$ million Adjusted EBITDA 1 in US$ million Net Income in US$ million Cash and Net Debt 1 in US$ million LTM Adjusted Ebitda LTM Net Income Cash Net Debt LTM Net Revenue 43 (3) Adjusted Net Income: 25 Mostly non cash losses related to gold hedges MTM ND / LTM Ebitda 0.9 0.8 0.6 0.7 27 1. This is a non - IFRS measure. See applicable reconciliation to IFRS in our Management’s Discussion and Analysis accompanying ou r financial statements filed from time to time on SEDAR at www.sedar.com and EDGAR at www.sec.gov 134 156 172 162 190 501 547 594 624 680 -200 0 200 400 600 Q2 2024 Q3 2024 Q4 2024 Q1 2025 56 78 79 81 106 180 228 267 295 344 -900 -700 -500 -300 -100 100 300 Q2 2024 Q3 2024 Q4 2024 Q1 2025 - 26 - 12 16 - 73 8 - 33 - 53 - 31 - 95 - 61 Q2 2024 Q3 2024 Q4 2024 Q1 2025 142 144 187 272 280 192 196 270 198 168 Q2 2024 Q3 2024 Q4 2024 Q2 2025 Q2 2025 Q2 2025 0.8 37 Q2 2025 Not including US$ 198 million gross proceeds from Nasdaq IPO Q1 2025

TSX:ORA | B3:AURA33 | OTCQX:ORAAF www.auraminerals.com 13 Adjusted EBITDA of US$ 106 million and Adjusted Net Income of US $37 million in Q2 2025, mostly related to unrealized loss from MTM gold derivatives 1. 1. This is a non - IFRS measure. See applicable reconciliation to IFRS in our Management’s Discussion and Analysis accompanying ou r financial statements filed from time to time on sedar + at www.sedarplus.ca and EDGAR at www.sec.gov Adjusted EBITDA 1 to Net Income Q2 2025 US$ m illion Adjusted EBITDA Amortization & Depletion Financial Expenses Income tax expense Other Net Income MTM losses with gold derivatives Foreign Exchange (gain) loss Deffered Taxes over non - monetary items Adjusted Net Income 24 MTM losses with derivatives 2 Foreign exchange ( 7 ) 106 9 Loss on settlement of liability with equity instrument Adjusted net income Adjusted Ebitda ( 15 ) Amortization & depletion ( 60 ) Financial expense ( 23 ) income tax expense 0 Other Net income 8 37 Deferred taxes over non monetary items Non - cash impact • Aranzazu: 35.7 • Minosa: 33.5 • Almas: 24.7 • Apoena: 16.1 • Borborema : 2.1 • Corporate and projects: (5.9) • Unrealized losses with derivative gold collars: 24.3 • Realized loss with derivative gold collars: 11.7

TSX:ORA | B3:AURA33 | OTCQX:ORAAF www.auraminerals.com 14 Continuous free cashflows generation, financing growth and return for investors via share repurchases and quarterly dividends Change in Cash position¹ – Q2 2025 (Managerial view) US$ million Not including US$ 198 million gross proceeds from Nasdaq IPO Investment for growth ( 38 ) Exploration Expenses ( 36 ) 221 Subtotal ( 11 ) Interest Paid (net of swap derivatives) ( 9 ) Proceeds from Debt / Repayments ( 15 ) Dividends ( 3 ) FX on cash & equivalents and others 168 Cash and Equivalents, June 30, 2025 ( 30 ) 198 Cash and Equivalents, March 31, 2025 106 Adjusted EBITDA 2 Exploration Expense Adjusted CAPEX 7 Changes in WC and others ( 23 ) Income Taxes paid ( 5 ) Lease Payments ( 12 ) Realized losses w/ gold hedges Expansion CAPEX 259 Subtotal 198 259 221 168 ( 2 ) +60 1. 1. This is a non - IFRS measure. See applicable reconciliation to IFRS in our Management’s Discussion and Analysis accompanying ou r financial statements filed from time to time on sedar + at www.sedarplus.ca and EDGAR at www.sec.gov

Contact: Investor Relations – Natasha Utescher natasha.utescher@auraminerals.com www.auraminerals.com

Q&A
EXHIBIT 99.4

Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025 and 2024
Aura Minerals Inc.
Unaudited Condensed Interim Consolidated Statements of Income (loss)
For the three and six months ended June 30, 2025 and 2024
Expressed in thousands of United States dollars, except share and per share amounts
| Note | Three-month period ended June 30, 2025 | For the three months ended June 30, 2024 | Six-month period ended June 30, 2025 | For the six months ended June 30, 2024 | ||||||||||||||||
| Net revenue | 19 | 190,436 | 134,411 | 352,240 | 266,489 | |||||||||||||||
| Cost of goods sold | 20 | (86,497 | ) | (83,103 | ) | (169,873 | ) | (168,500 | ) | |||||||||||
| Gross Profit | 103,939 | 51,308 | 182,367 | 97,989 | ||||||||||||||||
| General and administrative expenses | 21 | (11,284 | ) | (7,531 | ) | (20,920 | ) | (15,810 | ) | |||||||||||
| Exploration expenses | 22 | (1,714 | ) | (2,951 | ) | (3,090 | ) | (4,893 | ) | |||||||||||
| Operating income | 90,941 | 40,826 | 158,357 | 77,286 | ||||||||||||||||
| Finance expense | 23 | (59,630 | ) | (45,102 | ) | (181,241 | ) | (79,197 | ) | |||||||||||
| Other income (expenses) | 61 | 1 | (693 | ) | (593 | ) | ||||||||||||||
| Profit before income taxes | 31,372 | (4,275 | ) | (23,577 | ) | (2,504 | ) | |||||||||||||
| Current income tax expense | 14 | (29,551 | ) | (14,612 | ) | (50,365 | ) | (24,755 | ) | |||||||||||
| Deferred income tax expense | 14 | 6,326 | (6,888 | ) | 8,840 | (7,733 | ) | |||||||||||||
| Profit/(loss) for the period | 8,147 | (25,775 | ) | (65,102 | ) | (34,992 | ) | |||||||||||||
| Weighted average numbers of common shares outstanding | ||||||||||||||||||||
| Basic | 31 | 74,328,457 | 72,342,498 | 73,771,206 | 72,290,638 | |||||||||||||||
| Diluted | 31 | 75,199,163 | 72,342,498 | 73,771,206 | 72,290,638 | |||||||||||||||
| Income (loss) per share - Basic | 31 | 0.11 | (0.36 | ) | (0.88 | ) | (0.48 | ) | ||||||||||||
| Income (loss) per share - Diluted | 31 | 0.11 | (0.36 | ) | (0.88 | ) | (0.48 | ) | ||||||||||||
The accompanying notes form an integral part of these Unaudited Condensed Interim Consolidated Financial Statements.
| 2 | Aura Minerals Inc. |
Aura Minerals Inc.
Unaudited Condensed Interim Consolidated Statements of Other Comprehensive Income (loss)
For the three and six months ended June 30, 2025 and 2024
Expressed in thousands of United States dollars
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |||||||||||||
| (Loss)/Profit for the period | 8,147 | (25,775 | ) | (65,102 | ) | (34,992 | ) | |||||||||
| Other comprehensive income: | ||||||||||||||||
| Items that are or may be reclassified subsequently to profit or loss | ||||||||||||||||
| Change in the fair value of cash flow hedge, net of tax | 5 | (865 | ) | 2,591 | (1,176 | ) | ||||||||||
| Loss on foreign exchange translation of subsidiaries | 1,049 | (597 | ) | 1,011 | (1,126 | ) | ||||||||||
| Items that will not be reclassified to profit or loss | ||||||||||||||||
| Change in the fair value of equity investments | (143 | ) | (194 | ) | 193 | (655 | ) | |||||||||
| Actuarial gain on post-employment benefit, net of tax | 294 | — | 294 | — | ||||||||||||
| Other comprehensive income (loss), net of tax | 1,205 | (1,656 | ) | 4,089 | (2,957 | ) | ||||||||||
| Total comprehensive income (loss) | 9,352 | (27,431 | ) | (61,013 | ) | (37,949 | ) | |||||||||
Items above are stated net of tax and the related taxes are disclosed in note 14 (b).
The accompanying notes form an integral part of these Unaudited Condensed Interim Consolidated Financial Statements.
| 3 | Aura Minerals Inc. |
Aura Minerals Inc.
Unaudited Condensed Interim Consolidated Statements of Cash Flow
For the six months ended June 30, 2025 and 202
Expressed in thousands of United States dollars
| Note | For the six months ended June 30, 2025 | For the six months ended Jun 30, 2024 | ||||||||||
| Cash flows from operating activities | ||||||||||||
| Loss for the period | (65,102 | ) | (34,992 | ) | ||||||||
| Items adjusting loss of the period | 24(a) | 237,832 | 132,015 | |||||||||
| Changes in working capital | 24(b) | (10,763 | ) | (17,133 | ) | |||||||
| Income tax paid | (39,444 | ) | (11,434 | ) | ||||||||
| Other current and non-current assets and liabilities | 24(c) | (1,430 | ) | 11,008 | ||||||||
| Net cash generated by operating activities | 121,093 | 79,464 | ||||||||||
| Cash flows from investing activities | ||||||||||||
| Purchase of property, plant and equipment | (102,050 | ) | (53,278 | ) | ||||||||
| Acquisition of investment – Bluestone Resources | 5 | (18,538 | ) | — | ||||||||
| Acquisition of investment – Altamira | 10 | (439 | ) | — | ||||||||
| Net cash used in investing activities | (121,027 | ) | (53,278 | ) | ||||||||
| Cash flows from financing activities | ||||||||||||
| Proceeds received from loans and debentures | 24(e) | — | 34,000 | |||||||||
| Repayment of loans and debentures | 24(e) | (20,602 | ) | (23,312 | ) | |||||||
| Derivative settlement- debt swap agreements | 2,582 | 2,868 | ||||||||||
| Derivative fee | — | (13,522 | ) | |||||||||
| Interest paid on loans and debentures | 24(e) | (21,172 | ) | (17,698 | ) | |||||||
| Payment of liability (NSR agreement) | (1,594 | ) | (1,210 | ) | ||||||||
| Principal and interest payments of lease liabilities | 17(b) | (9,361 | ) | (8,680 | ) | |||||||
| Repayment of other liabilities | 17(a) | (981 | ) | (825 | ) | |||||||
| Payment of dividends | 27 | (48,144 | ) | (25,339 | ) | |||||||
| Proceeds from exercise of stock options | — | 100 | ||||||||||
| Acquisition of treasury shares | (1,200 | ) | (3,458 | ) | ||||||||
| Net cash used in financing activities | (100,472 | ) | (57,076 | ) | ||||||||
| (Decrease) in cash and cash equivalents | (100,406 | ) | (30,890 | ) | ||||||||
| Effect of foreign exchange (loss) on cash equivalents | (1,845 | ) | (14,442 | ) | ||||||||
| Cash and cash equivalents, beginning of the year | 270,189 | 237,295 | ||||||||||
| Cash and cash equivalents, end of the period | 167,938 | 191,963 | ||||||||||
The accompanying notes form an integral part of these Unaudited Condensed Interim Consolidated Financial Statements.
| 4 | Aura Minerals Inc. |
Aura Minerals Inc.
Unaudited Condensed Interim Consolidated Statements of Financial Position
As of June 30, 2025 and December 31, 2024
Expressed in thousands of United States dollars
| Note | June 30, 2025 | December 31, 2024 | ||||||||||
| ASSETS | ||||||||||||
| Current | ||||||||||||
| Cash and cash equivalents | 6 | 167,938 | 270,189 | |||||||||
| Accounts receivables | 7 | 4,826 | 15,835 | |||||||||
| Value added taxes and other recoverable taxes | 8 | 21,292 | 19,901 | |||||||||
| Inventories | 9 | 80,034 | 57,943 | |||||||||
| Derivative financial instrument | 25 | 5,395 | — | |||||||||
| Other receivables and assets | 10 | 21,560 | 25,467 | |||||||||
| Total current | 301,045 | 389,335 | ||||||||||
| Non-current | ||||||||||||
| Value added taxes and other recoverable taxes | 8 | 46,329 | 40,596 | |||||||||
| Inventories | 9 | 23,025 | 19,386 | |||||||||
| Other receivables and assets | 10 | 4,319 | 4,943 | |||||||||
| Property, plant and equipment | 11 | 762,566 | 610,784 | |||||||||
| Deferred income tax assets | 14 | 28,639 | 15,218 | |||||||||
| Total non-current | 864,878 | 690,927 | ||||||||||
| 1 | ||||||||||||
| Total assets | 1,165,923 | 1,080,262 | ||||||||||
| LIABILITIES | ||||||||||||
| Current | ||||||||||||
| Trade and other payables | 12 | 111,156 | 98,067 | |||||||||
| Derivative financial instruments | 25 | 26,654 | 19,302 | |||||||||
| Loans and debentures | 13 | 78,786 | 82,007 | |||||||||
| Liability measured at fair value | 4,850 | 3,362 | ||||||||||
| Current income tax liabilities | 14 | 28,507 | 31,618 | |||||||||
| Current portion of other liabilities | 17 | 14,939 | 14,190 | |||||||||
| Liabilities directly associated with assets classified as held for sale | 2,757 | 2,757 | ||||||||||
| Total current | 267,649 | 251,303 | ||||||||||
| Non-current | ||||||||||||
| Loans and debentures | 13 | 375,107 | 361,097 | |||||||||
| Liability measured at fair value | 17,689 | 14,387 | ||||||||||
| Derivative financial instruments | 25 | 222,901 | 120,188 | |||||||||
| Deferred income tax liabilities | 14 | 35,925 | 31,583 | |||||||||
| Provision for mine closure and restoration | 15 | 64,470 | 50,573 | |||||||||
| Other provisions | 16 | 28,467 | 17,144 | |||||||||
| Other liabilities | 17 | 13,951 | 11,032 | |||||||||
| Total non-current | 758,510 | 606,004 | ||||||||||
| SHAREHOLDERS’ EQUITY | 18 | |||||||||||
| Share capital | 633,271 | 599,200 | ||||||||||
| Contributed surplus | 55,669 | 55,596 | ||||||||||
| Accumulated other comprehensive income | (4,812 | ) | (723 | ) | ||||||||
| Accumulated losses | (544,364 | ) | (431,118 | ) | ||||||||
| Total equity | 139,764 | 222,955 | ||||||||||
| Total liabilities and equity | 1,165,923 | 1,080,262 | ||||||||||
|
Approved on behalf of the Board of Directors: “Stephen Keith” |
“Rodrigo Barbosa” | |
| Stephen Keith, Director | Rodrigo Barbosa, President & CEO |
The accompanying notes form an integral part of these Unaudited Condensed Interim Consolidated Financial Statements.
| 5 | Aura Minerals Inc. |
Aura Minerals Inc.
Unaudited Condensed Interim Consolidated Statements of Changes in Equity
For the six months ended June 30, 2025 and 2024
Expressed in thousands of United States dollars, except share amounts
| Number of Common Shares | Share Capital | Contributed Surplus | Accumulated Other Comprehensive Income | Accumulated losses | Total Equity | |||||||||||||||||||
| At December 31, 2024 | 72,399,495 | 599,200 | 55,596 | (723 | ) | (431,118 | ) | 222,955 | ||||||||||||||||
| Issuance of new shares | 2,226,008 | 35,271 | — | — | — | 35,271 | ||||||||||||||||||
| Shared based compensation | — | — | 73 | — | — | 73 | ||||||||||||||||||
| Acquisition of treasury shares / Cancellation of shares | (96,141 | ) | (1,200 | ) | — | — | — | (1,200 | ) | |||||||||||||||
| Change in the fair value of cash flow hedge, net of tax | — | — | — | (2,591 | ) | — | (2,591 | ) | ||||||||||||||||
| Gain on foreign exchange translation of subsidiaries | — | — | — | (1,011 | ) | — | (1,011 | ) | ||||||||||||||||
| Change in the fair value of equity investments | — | — | — | (193 | ) | — | (193 | ) | ||||||||||||||||
| Actuarial (loss) on post-employment benefit, net of tax | — | — | — | (294 | ) | — | (294 | ) | ||||||||||||||||
| Loss for the period | — | — | — | — | (65,102 | ) | (65,102 | ) | ||||||||||||||||
| Dividends paid (note 27) | — | — | — | — | (48,144 | ) | (48,144 | ) | ||||||||||||||||
| At June 30, 2025 | 74,529,362 | 633,271 | 55,669 | (4,812 | ) | (544,364 | ) | 139,764 | ||||||||||||||||
| Number of Common Shares | Share Capital | Contributed Surplus | Accumulated Other Comprehensive Income | Accumulated losses | Total Equity | |||||||||||||||||||
| At December 31, 2023 | 72,237,003 | 612,299 | 55,478 | 5,179 | (358,154 | ) | 314,802 | |||||||||||||||||
| Shared based compensation | 196,450 | 136 | 16 | — | — | 152 | ||||||||||||||||||
| Acquisition of treasury shares / Cancellation of shares | (34,908 | ) | (3,458 | ) | — | — | — | (3,458 | ) | |||||||||||||||
| Change in the fair value of cash flow hedge, net of tax | — | — | — | (1,176 | ) | — | (1,176 | ) | ||||||||||||||||
| Gain on foreign exchange translation of subsidiaries | — | — | — | (1,126 | ) | — | (1,126 | ) | ||||||||||||||||
| Change in fair value of investment and liability measured at fair value | — | — | — | (655 | ) | — | (655 | ) | ||||||||||||||||
| Loss for the period | — | — | — | — | (34,992 | ) | (34,992 | ) | ||||||||||||||||
| Dividends paid (note 27) | — | — | — | — | (25,339 | ) | (25,339 | ) | ||||||||||||||||
| At June 30, 2024 | 72,398,545 | 608,977 | 55,494 | 2,222 | (418,485 | ) | 248,208 | |||||||||||||||||
The accompanying notes form an integral part of these Unaudited Condensed Interim Consolidated Financial Statements.
| 6 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
1 NATURE OF OPERATIONS
Aura Minerals Inc. (“Aura Minerals”, “Aura”, or the “Company”) is a mid-tier gold and copper production company focused on the operation and development of gold and base metal projects in the Americas.
Aura Minerals Inc. is a public company whose common shares are listed on the Toronto Stock Exchange (Symbol: ORA), its Brazilian Depositary Receipts, each representing one common share, are listed on the B3 – Brasil, Bolsa Balcão (Symbol: AURA33). Aura is incorporated under the BVI Business Companies Act, 2004 (British Virgin Islands). Aura’s registered office is located at Craigmuir Chambers, Road Town, Tortola, VG1110, British Virgin Islands. Aura maintains a head office through its wholly owned subsidiary Aura Technical Services Inc., at 3390 Mary St, Suite 116, Coconut Grove, Miami, FL, 33133, United States of America. Subsequent to June 30, 2025, the Company’s common shares commenced trading on the Nasdaq Global Select Market under the ticker symbol “AUGO” on July 17, 2025. See Note 32 – Subsequent Events.
Aura’s controlling party is Northwestern Enterprises Ltd (“Northwestern”), a company beneficially owned by the Chairman of the board of directors of Aura (the “Board”).
These unaudited condensed interim consolidated financial statements (the “financial statements”) were approved by the Board of Directors on August 5, 2025.
2 BASIS OF PREPARATION AND PRESENTATION
The Unaudited condensed interim consolidated financial statements of the Company have been prepared in accordance with IAS 34 – Interim Financial Reporting, as issued by International Accounting Standard Board (IASB). These Unaudited condensed interim consolidated financial statements should be read in conjunction with Aura’s annual consolidated financial statements for the year ended December 31, 2024, ("2024 Annual Financial Statements").
The accounting policies followed in these Unaudited condensed interim consolidated financial statements are consistent with those disclosed in Note 3 of 2024 Annual Financial Statements, except for those new or revised standards adopted as of January 1, 2025 as is the case with the amendments to IAS 21 – Effects of Changes in Foreign Exchange Rates. As disclosed in the 2024 Annual Financial Statements, these amendments have not had a significant impact on the Company’s unaudited condensed interim consolidated financial statements.
The functional currency of Aura and the majority
of its subsidiaries is the United States Dollar (“US Dollar”) except for a non material service company in Mexico which has
a functional currency of Mexican Pesos (“MXN Pesos”) and certain non material Brazilian subsidiaries in Brazilian Reais (“BRL
Reais”). All values in the consolidated financial statements are rounded to the nearest thousand.
| 7 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
3 ACCOUNTING STANDARDS ISSUED BUT NOT YET EFFECTIVE
A number of new accounting standards are effective for annual reporting periods beginning after January 1, 2025 and earlier application is permitted.
A – IFRS Presentation and disclosure in financial statements
IFRS 18 will replace IAS 1 Presentation of Financial Statements and applies for annual reporting periods beginning on or after January 1, 2027. The new standard introduces the following key new requirements:
| - | Entities are required to classify all income and expenses into five categories in the statement of profit and loss, namely the operating, investing, financing, discontinued operations and income tax categories. Entities are also required to present a newly defined operating profit subtotal. Entities’ net profit will not change. |
| - | Management defined performance measures (“MPMs”) are disclosed in a single note in the financial statements. |
| - | Enhanced guidance is provided on how to group information in the financial statements. |
In addition, all entities are required to use the operating profit subtotal as the starting point for the statement of cash flows when presenting operating cash flows under the indirect method.
The Company is in the process of assessing the impact of the new standard, particularly with respect to the structure of the Company´s statement of profit and loss, the statement of cash flows and the additional disclosures required for MPMs. The Company is also assessing the impact on how information is grouped in the financial statements, including for the items currently labelled as ‘other’.
B – Other accounting standards
The following new amended accounting standard is not expected to have a significant impact on the Company´s consolidated financial statements.
| - | Classification and Measurement of Financial Instruments (Amendment to IFRS 9 and IFRS 7). |
4 SIGNIFICANT ACCOUNTING ESTIMATES AND JUDGEMENTS
The preparation of the consolidated financial statements requires management to make estimates and judgements and to form assumptions that affect the reported amounts of assets and liabilities and disclosures of contingent liabilities. Management’s estimates and judgements are continually evaluated and are based on historical experience and other factors that management believes to be reasonable under the circumstances. Actual results may differ from these estimates.
| 8 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
The Company has identified critical accounting policies under which significant judgements, estimates and assumptions are made and where actual results could differ from these estimates under different assumptions and conditions and could materially affect the Company’s financial results or statements of financial position reported in future periods.
Please refer to Note 4 of the 2024 Annual Financial Statements for a summary of the significant accounting estimates and judgements which are consistent with those in the preparation of the financial statements. Management’s estimates and judgements are evaluated quarterly and are based on historical experience and other factors that management believes to be reasonable under the circumstances. Actual or future results may differ from these estimates.
5 ACQUISITIONS
| a) | Asset acquisition– Bluestone Resources (“Bluestone”) |
In December 2024, the Company acquired, at market value, 5,500,000 shares of Bluestone, representing 3.62% of its total shares, for a total consideration of $1,327. The acquisition was valued based on the quoted market price of Bluestone’s shares on the Canadian stock exchange at the acquisition date and was recorded as an investment under other non-current assets (see Note 10).
On January 13, 2025, Aura completed the acquisition of control of Bluestone, acquiring all remaining 96.38% shares for an additional amount of $40,299 as follows:
- Cash Consideration = $18,342 (equivalent to C$26,255)
- Non-Cash Consideration = $12,503
Aura issued 1,007,186 common shares to Bluestone´s former shareholders (0.0183 common shares of Aura for each Bluestone Share held). The shares were valued based on the quoted market price of Aura’s shares on the Canadian stock exchange at the acquisition date.
- Contingent Value Rights (CVRs) = $9,120 (C$13,111) (note 16)
The fair value of the CVRs was determined based on three fixed annual payments, contingent upon the achievement of commercial production, defined as when either: (i) Aura announces that commercial production at Cerro Blanco has been achieved, or (ii) it has operated for 90 consecutive days with 80% or more of used capacity.
The fair value of the CVRs was determined using a probability-weighted discounted cash flow model. This model incorporated management’s current estimates of the probability of achieving commercial production, the expected timing of it and the contractual payout structure. The expected payments were discounted to present value using a 7.4% discount rate.
- Capitalized Acquisition Costs = $334
These costs, consisting of legal and consulting fees paid in January
2025, were capitalized as part of the investment in accordance with applicable accounting standards.
| 9 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
Upon the closing of the transaction, Bluestone's assets primarily consisted of mineral properties. Given that Bluestone did not have processes capable of generating outputs, it did not meet the definition of a business under the applicable accounting standards. As a result, the transaction has been treated as an asset acquisition.
The table below summarizes the financial information of the investment as of January 13, 2025 (acquisition date):
| Book value | Fair value allocation | Fair value acquired | ||||||||||||
| Assets acquired | Cash and cash equivalents | 138 | — | 138 | ||||||||||
| Other assets | 687 | — | 687 | |||||||||||
| Property, plant and equipment (Note 11) | 52,487 | 22,734 | 75,221 | |||||||||||
| Liabilities assumed | Trade and other payables | 761 | — | 761 | ||||||||||
| Other liabilities | 2,954 | — | 2,954 | |||||||||||
| Loans and debentures | 19,900 | — | 19,900 | |||||||||||
| Provision for mine closure and restoration | 9,668 | — | 9,668 | |||||||||||
| Deferred income tax liabilities | 1,137 | — | 1,137 | |||||||||||
| Net assets | 18,892 | 22,734 | 41,626 | |||||||||||
| b) | Mineração Serra Grande S.A. (“MSG”) aquisition |
On June 2, 2025, Aura Minerals Inc., through its wholly owned subsidiary, entered into a Share Purchase Agreement with AngloGold Ashanti plc to acquire 100% of the shares of Mineração Serra Grande S.A. (“MSG”), owner of the Serra Grande gold mine in Crixás, Goiás, Brazil.
Under the terms of the agreement, Aura will pay an upfront cash consideration of US$76 million at closing, subject to working capital adjustments. Additional deferred consideration will be paid through a 3% net smelter return (NSR) royalty on MSG’s currently identified Mineral Resource.
The transaction excludes certain non-operational subsidiaries of MSG, which will be spun off prior to closing. The completion of the acquisition is subject to customary closing conditions, including CADE approval, decommissioning of a legacy tailings dam, and no material adverse events.
Closing is expected to occur in the second half of 2025.
| 10 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
6 CASH AND CASH EQUIVALENTS
| June 30, 2025 | December 31, 2024 | |||||||
| Cash at bank | 41,964 | 63,056 | ||||||
| Term deposits | 125,974 | 207,133 | ||||||
| Cash and Cash Equivalents | 167,938 | 270,189 | ||||||
Term deposits represent amounts that have a maturity of three months or less from the date of acquisition and are repayable with 24 hours notice with no loss of interest.
7 ACCOUNTS RECEIVABLES
| June 30, 2025 | December 31, 2024 | |||||||
| Trade receivables | 4,473 | 2,354 | ||||||
| Other receivables (a) | 353 | 13,481 | ||||||
| Accounts receivables | 4,826 | 15,835 | ||||||
The Company periodically measures expected credit losses and considers the history and financial conditions of its clients. The Company did not recognize any credit losses in these financial statements.
| (a) | The amount was mostly related to the sale agreement by the Company of the Serrote Project to Appian Capital Advisory LLP. The sale price was the total amount of $40 million and the aggregate consideration of $40 million was made up of a cash payment of $30 million (collected), as well as the delivery by the purchasers of a subordinated unsecured promissory note in the principal amount of $10 million plus interest, payable from 75% of excess cash from the project after the project has repaid project financing and operating cash requirements. The note becomes payable immediately in the case Appian Capital Advisory LLP, the current owner of Mineração Vale Verde (“MVV”), that developed the Serrote Project, decided to sell its investment in MVV. The full amount was collected in April 2025. |
8 VALUE ADDED TAX AND OTHER RECOVERABLE TAXES
| June 30, 2025 | December 31, 2024 | |||||||
| Sales taxes and value added taxes | ||||||||
| Apoena, Almas and Others | 36,556 | 30,136 | ||||||
| Aranzazu | 2,407 | 2,796 | ||||||
| Minosa | 25,421 | 24,866 | ||||||
| Other taxes | ||||||||
| Income taxes and social contribution | 3,237 | 2,699 | ||||||
| Total Value added tax and other recoverable taxes | 67,621 | 60,497 | ||||||
| Current | 21,292 | 19,901 | ||||||
| Non-Current | 46,329 | 40,596 | ||||||
| 11 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
Value added tax receivables are expected to be recovered, taking into consideration the different alternatives available to the Company, including: (1) reimbursement from government “authorities” and/or (2) used as credit for income tax payments; and/or (3) sales in the domestic market.
9 INVENTORIES
| June 30, 2025 | December 31, 2024 | |||||||
| Finished product | 1,631 | 2,006 | ||||||
| Work-in-process | 65,911 | 47,521 | ||||||
| Parts and supplies | 35,517 | 27,802 | ||||||
| Total inventories | 103,059 | 77,329 | ||||||
| Current | 80,034 | 57,943 | ||||||
| Non-current | 23,025 | 19,386 | ||||||
As of June 30, 2025 and December 31, 2024, the non-current inventory is related to Almas’ low grade stockpile.
10 OTHER RECEIVABLES AND ASSETS
| June 30, 2025 | December 31, 2024 | |||||||
| Prepaids expenses | 2,864 | 4,129 | ||||||
| Advances to vendors | 14,879 | 15,378 | ||||||
| Deposits | 4,593 | 4,257 | ||||||
| Employees receivables (a) (Note 28) | — | 3,192 | ||||||
| Other assets (b) | 3,543 | 3,454 | ||||||
| Total other receivables and assets | 25,879 | 30,410 | ||||||
| Current | 21,560 | 25,467 | ||||||
| Non-current | 4,319 | 4,943 | ||||||
| (a) | The Company has paid on behalf of certain key management personnel, certain withholding taxes associated with the exercise of stock options in the amount of $3,192 included as current other receivables (see Note 28 for further details). This amount was fully reimbursed by the personnel in June 2025. |
| (b) | On November 7, 2023, the Company entered into a subscription agreement with Altamira Gold Corp. (“Altamira”) pursuant to which it acquired 24,000,000 units of Altamira at a price of $0.090 (C$0.125 - Canadian Dollars) per unit for an aggregate purchase price of $2,167 (C$3,000 - Canadian Dollars). Each unit consists of one common share and one common share purchase warrant of Altamira. Each warrant is exercisable to acquire one share of Altamira at a strike price of $ 0.14 (C$0.20 - Canadian Dollars) per share for a period of two years from November 7, 2023. |
| 12 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
On June 30, 2025, the Company entered into a second subscription agreement with Altamira pursuant to which it acquired, an additional 6,000,000 units at a price of $0.070 (C$0.10 - Canadian Dollars) per unit, for an aggregate purchase price of $439 (C$600 – Canadian Dollars). Each unit consists of one common share and one-half of one common share purchase warrant. Each full warrant is exercisable to acquire one common share of Altamira at a price of $0.11 (C$0.15 - Canadian Dollars) per share for a period of two years from June 30, 2025.
Following this transaction, the Company holds a total of 30,000,000 common shares and 27,000,000 warrants of Altamira, representing approximately 11.3% of the issued and outstanding common shares on a non-diluted basis and 19.5% on a fully diluted basis.
The common shares are recorded at fair value through OCI and the amount as of June 30, 2025 is $2,419 ($2,168 as of December 31, 2024).
11 PROPERTY, PLANT AND EQUIPMENT
Property, plant and equipment movements for the six months ended June 30, 2025 and 2024 are as follows:
| Mineral properties | Land and buildings | Furniture, fixtures and equipment | Plant and machinery | Right of use assets | Assets under construction | Total | ||||||||||||||||||||||
| Net book value at December 31, 2024 | 312,312 | 51,948 | 9,835 | 63,692 | 29,609 | 143,388 | 610,784 | |||||||||||||||||||||
| Additions | 27,636 | 5,014 | 1,040 | 1,919 | 6,236 | 70,933 | 112,778 | |||||||||||||||||||||
| Bluestone acquisition | 46,990 | 20,337 | 96 | 1,980 | — | 5,818 | 75,221 | |||||||||||||||||||||
| Depreciation | (17,789 | ) | (6,975 | ) | (1,184 | ) | (3,714 | ) | (6,119 | ) | — | (35,781 | ) | |||||||||||||||
| Reclassifications | 2,403 | — | (2,403 | ) | 1,819 | — | (1,819 | ) | — | |||||||||||||||||||
| Disposals | (87 | ) | (180 | ) | (104 | ) | (65 | ) | — | — | (436 | ) | ||||||||||||||||
| Net book value at June 30, 2025 | 371,465 | 70,144 | 7,280 | 65,631 | 29,726 | 218,320 | 762,566 | |||||||||||||||||||||
| Consisting of: | ||||||||||||||||||||||||||||
| Cost | 651,785 | 161,993 | 25,238 | 198,608 | 61,188 | 218,320 | 1,317,132 | |||||||||||||||||||||
| Accumulated Depreciation | (280,320 | ) | (91,849 | ) | (17,958 | ) | (132,977 | ) | (31,462 | ) | — | (554,566 | ) | |||||||||||||||
| Net book value at June 30, 2025 | 371,465 | 70,144 | 7,280 | 65,631 | 29,726 | 218,320 | 762,566 | |||||||||||||||||||||
| Mineral properties | Land and buildings | Furniture, fixtures and equipment | Plant and machinery | Right of use assets | Assets under construction | Total | ||||||||||||||||||||||
| Net book value at December 31, 2023 | 318,651 | 53,861 | 10,719 | 62,138 | 37,814 | 5,550 | 488,733 | |||||||||||||||||||||
| Additions | 27,860 | 4,054 | 528 | 1,989 | 1,077 | 24,631 | 60,139 | |||||||||||||||||||||
| Depletion and amortization | (12,023 | ) | (8,158 | ) | (1,036 | ) | (4,968 | ) | (5,368 | ) | — | (31,553 | ) | |||||||||||||||
| Disposals | (449 | ) | (76 | ) | — | (28 | ) | (24 | ) | — | (577 | ) | ||||||||||||||||
| Net book value at June 30, 2024 | 334,039 | 49,681 | 10,211 | 59,131 | 33,499 | 30,181 | 516,742 | |||||||||||||||||||||
| Consisting of: | ||||||||||||||||||||||||||||
| Cost | 574,289 | 133,981 | 26,225 | 186,378 | 53,294 | 30,181 | 1,004,348 | |||||||||||||||||||||
| Accumulated depletion and amortization | (240,250 | ) | (84,300 | ) | (16,014 | ) | (127,247 | ) | (19,795 | ) | — | (487,606 | ) | |||||||||||||||
| Net book value at June 30, 2024 | 334,039 | 49,681 | 10,211 | 59,131 | 33,499 | 30,181 | 516,742 | |||||||||||||||||||||
| 13 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
The right of use assets corresponds to the lease liability obligations disclosed in Note 17(b).
For the period ended June 30, 2025, $4,768 of interest related to loans and debentures was capitalized (100% capitalization rate) as part of the construction cost at Borborema project ($5,209 for the period ended June 30, 2024).
12 TRADE AND OTHER PAYABLES
| June 30, 2025 | December 31, 2024 | |||||||
| Trade accounts payable to suppliers | 70,678 | 69,565 | ||||||
| Other taxes payables | 18,576 | 15,820 | ||||||
| Accrued liabilities to suppliers | 21,902 | 12,682 | ||||||
| Total accounts payable | 111,156 | 98,067 | ||||||
| 14 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
13 LOANS AND DEBENTURES
The list of loans and debentures held by the Company, as of June 30, 2025 and December 31, 2024 is as follows:
| Financial debt | Maturity Date | Interest Rate | June 30, 2025 | December 31, 2024 | ||||||||||
| Bank Occidente | ||||||||||||||
| Q2 2022 Promissory Note (“5º Promissory Note”) | May 2026 | 6.25% | 2,540 | 3,882 | ||||||||||
| Q3 2022 Promissory Note (“6º Promissory Note”) | August 2026 | 6.25% | 3,435 | 4,709 | ||||||||||
| Q2 2023 Promissory Note (“7º Promissory Note”) | June 2025 | 7.50% | — | 1,320 | ||||||||||
| Q1 2024 Promissory Note (“8° Promissory Note”) | February 2026 | 7.50% | 1,747 | 3,000 | ||||||||||
| Q3 2024 Promissory Note (“9° Promissory Note”) | July 2027 | 8.00% | 3,487 | 4,178 | ||||||||||
| Bank Atlántida | ||||||||||||||
| Q2 2022 Loan Agreement (“7º Loan”) | March 2027 | 6.50% | 4,375 | 5,625 | ||||||||||
| Bank ABC Brasil S.A. | ||||||||||||||
| Q4 2022 Loan Agreement (“5º Loan”) | January 2026 | 5.38% | 6,581 | 10,968 | ||||||||||
| Bank Santander Mexico | ||||||||||||||
| Q3 2024 Loan Agreement (“5° Loan”) | August 2027 | * SOFR + 3.8% | 28,708 | 35,333 | ||||||||||
| Bank Santander Brazil | ||||||||||||||
| Q3 2023 Loan Agreement (“4° Loan”) | November 2028 | 9.51% | 103,972 | 104,073 | ||||||||||
| Bank Safra | ||||||||||||||
| Q3 2024 Loan Agreement (“2° Loan”) | August 2026 | 7.10% | 20,517 | 20,513 | ||||||||||
| Bank Brasil | ||||||||||||||
| Q1 2024 Loan Agreement (“1º Loan”) | December 2028 | 6.50% | 10,000 | 10,003 | ||||||||||
| Bank Bradesco | ||||||||||||||
| Q1 2022 Loan Agreement (“1º Loan”) | February 2025 | * CDI + 2.342% | — | 2,453 | ||||||||||
| Q4 2024 Loan Agreement (“2° Loan”) | December 2028 | 6.50% | 43,097 | 43,000 | ||||||||||
| Other banks | ||||||||||||||
| BTG Pactual | November 2027 | 6.70% | 20,112 | 20,116 | ||||||||||
| Debentures payable | ||||||||||||||
| Debentures – 2nd issuance | October 2030 | * CDI + 1.60% | 187,213 | 162,515 | ||||||||||
| Gold Royalty Corp | ||||||||||||||
| Gold linked loan | December 2029 | 8.5% | 12,209 | 11,416 | ||||||||||
| Nemesia SARL | (a) | 7.00% | 5,900 | — | ||||||||||
| Total | 453,893 | 443,104 | ||||||||||||
| Current | 78,786 | 82,007 | ||||||||||||
| Non-Current | 375,107 | 361,097 | ||||||||||||
* Definition: Secured Overnight Financing Rate Data (“SOFR”) and Certificates of Interbank Deposits (“CDI”).
(a) This loan was recognized in the Company’s financial statements as a result of the acquisition of Bluestone.
On February 7, 2025, Aura, Nemesia S.à.r.l.,
and Bluestone, signed a term sheet for the purchase and assignment of the debt obligation related to the Cerro Blanco Project held by
Bluestone. On March 14, 2025, the parties executed a Debt Purchase and Assignment Agreement, reflecting the terms previously agreed between
the parties and subject to certain closing conditions, including approval from Toronto Stock Exchange (“TSX”). On April 15,
2025, the parties closed the transaction, pursuant to which Aura acquired from Nemesia S.à.r.l. all of Nemesia’s rights,
title, and interest in the outstanding debt of Bluestone in exchange for 1,218,222 common shares of Aura and an unsecured promissory note
in the principal amount of $5.9 million payable from Aura to Nemesia S.à.r.l (the “New Promissory Note”), The New Promissory
Note has a fixed interest rate of 7% and becomes due once Cerro Blanco achieves commercial production within the next 20 years. The fair
value of the 1,218,222 common shares issued was $22.8 million, based on Aura’s share price at the closing date. The transaction
resulted in a loss on settlement of liability with equity instruments of $8.8 million, recognized as a finance expense (Note 23) for the
six-month period ended June 30, 2025.
| 15 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
The non-current loans and debentures payments are as follows:
| Amount | |||||
| 2026 | ** | 96,279 | |||
| 2027 | 85,467 | ||||
| 2028 | 93,023 | ||||
| 2029 | 50,169 | ||||
| 2030 onwards | 50,169 | ||||
375,107 | |||||
** Includes amounts that become due from July 1, 2026.
Financial Covenants
Mineração Apoena S.A. (“Apoena”) – subsidiary of the Company
- Bank BTG Pactual.: Principal of US$ 37,000 entered in December 2024
The agreement has financial covenants where Net Debt should be lower than 2.75x over the last 12 months EBITDA. The covenant is measured on a quarterly basis at Aura Minerals Inc.
Aranzazu Holdings SA de CV (“Aranzazu”) – subsidiary of the Company
- Bank Santander México S.A.: Principal amount of $15,000, in August 2024 plus $22,000 in December, 2024
The agreement has financial covenants where: Net Debt should be lower than 1.5x over the last 12 months EBITDA; and last 12 months EBITDA over the interest expense should be over or equal 5.0x. The covenant is measured on a quarterly basis at the subsidiary.
Aura Almas Mineração S.A. (“Almas”) – subsidiary of the Company
- Debentures: Principal of R$1,000,000 (US$161,491) entered in October 2024
The agreement also includes a quarterly financial covenant where the net debt to the last 12 months EBITDA ratio not exceed:
- in the case of Aura Minerals, 2.75x through June 30, 2025;
- in the case of Almas, 2.00x from July 1, 2025 through October 2, 2027; and
- in the case of Almas, 1.50x thereafter through maturity;
Aura Almas Mineração S.A. (“Almas”) – subsidiary of the Company
- Swap agreement entered in October 2024.
The agreement also includes a quarterly financial covenant where the net debt to the last 12 months EBITDA ratio not exceed:
- in the case of Aura Minerals, 2.75x through June 30, 2025;
- in the case of Almas, 2.00x from July 1, 2025 through October 2, 2027; and
- in the case of Almas, 1.50x
thereafter through maturity;
| 16 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
Aura Almas Mineração S.A. (“Almas”) – subsidiary of the Company
- Safra Bank: Principal of US$ 20,000 entered in August 2024
The agreement has financial covenants where Net Debt should be lower than 2.75x over the last 12 months EBITDA. The covenant is measured on a quarterly basis at Aura Minerals Inc.
Cascar Brasil Mineração Ltda. (“Cascar”) – subsidiary of the Company (Borborema Project)
- Santander Brasil S.A., principal of $100,750 entered in September 2023
The agreement has one annual financial covenant requiring that, beginning in the year ended December 31, 2025, following an initial grace period, where Cascar’s Net Debt should be lower than 1.5x over Cascar’s last 12 months EBITDA.
For the six months ended June 30, 2025, the Company and its subsidiaries are in compliance with all the financial covenants.
14 INCOME TAXES
a) Income taxes
As of June 30, 2025 the current income tax liability is $28,507 ($31,618 as of December 31, 2024).
Income tax expenses included in the unaudited condensed interim consolidated statements of income for the three and six-months periods ended June 30, 2025 and 2024 are as follows:
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |||||||||||||
| Current income tax | (29,551 | ) | (14,612 | ) | (50,365 | ) | (24,755 | ) | ||||||||
| Deferred income tax | 6,326 | (6,888 | ) | 8,840 | (7,733 | ) | ||||||||||
| Total income/deferred taxes expense | (23,225 | ) | (21,500 | ) | (41,525 | ) | (32,488 | ) | ||||||||
| 17 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
b) Deferred income tax assets and liabilities
Deferred tax assets and liabilities on the unaudited condensed interim consolidated statements of financial position consist of:
| Net deferred income tax assets (liabilities) are classified as follows: | June 30, 2025 | December 31, 2024 | ||||||
| Deferred income tax assets | 28,639 | 15,218 | ||||||
| Deferred income tax liabilities | (35,925 | ) | (31,583 | ) | ||||
| Total deferred taxes, net | (7,286 | ) | (16,365 | ) | ||||
The movements in the net deferred income tax asset (liability) account for the six months ended June 30, 2025 and 2024 are as follows:
| Balance, December 31, 2023 | 17,938 | |||
| Recorded in the statement of income (loss) | (7,733 | ) | ||
| Recorded through other comprehensive income | 507 | |||
| Exchange differences | (3,120 | ) | ||
| Balance, June 30, 2024 | 7,592 | |||
| Balance, December 31, 2024 | (16,365 | ) | ||
| Recorded in the statement of income (loss) | 8,840 | |||
| Recorded through other comprehensive income | (956 | ) | ||
| Acquisition of Bluestone | (1,137 | ) | ||
| Exchange differences | 2,332 | ) | ||
| Balance, June 30, 2025 | (7,286 | ) |
The deferred income tax and social contribution are calculated on tax loss carryforwards and the temporary differences between the tax bases of assets and liabilities and their carrying amounts, as follows:
| June 30, 2025 | December 31, 2024 | |||||||
| Provision for mine closure and restoration | 9,366 | 7,057 | ||||||
| Tax losses carried forward | 4,581 | 5,831 | ||||||
| Amortization of intangibles | 1,926 | 5,689 | ||||||
| Non-deductible provisions | 10,486 | 11,235 | ||||||
| Non-deductible exchange changes | 3,441 | (442 | ) | |||||
| Deferred taxes over non-monetary items | (20,540 | ) | (34,974 | ) | ||||
| Depreciation | (16,347 | ) | (9,198 | ) | ||||
| Advance payments | (3,615 | ) | (3,488 | ) | ||||
| Others | 3,416 | 1,925 | ||||||
| Total of deferred tax assets and liabilities | (7,286 | ) | (16,365 | ) | ||||
| Fair value of financial instruments | (1,051 | ) | (832 | ) | ||||
| Total of deferred tax on OCI | (1,051 | ) | (832 | ) | ||||
| 18 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
c) Effective tax rate
| For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |||||||
| Income (loss) before Income taxes | (23,577 | ) | (2,504 | ) | ||||
| Income taxes at statutory rate applicable to the parent Company (0%) | — | — | ||||||
| Adjustments for calculating the effective rate | ||||||||
| Tax calculated at the domestic rates | (43,538 | ) | (15,040 | ) | ||||
| Non-deductible expenses/non-taxable (income) | 87 | (399 | ) | |||||
| Unrecognized deferred tax asset (losses carried forward) | (3,065 | ) | (7,300 | ) | ||||
| Tax exemptions | 3,457 | 895 | ||||||
| Withholding taxes on distribution | (1,889 | ) | — | |||||
| Deferred taxes over non-monetary items | 10,081 | (11,472 | ) | |||||
| Others | (6,658 | ) | 828 | |||||
| Income tax expense | (41,525 | ) | (32,488 | ) | ||||
| Effective tax rate | 176.1 | % | 1,297.4 | % | ||||
15 PROVISION FOR MINE CLOSURE AND RESTORATION
The movements for the six months ended June 30, 2025 and 2024 are as follow:
| June 30, 2025 | June 30, 2024 | |||||||
| Balance, beginning of year | 50,573 | 48,727 | ||||||
| Bluestone acquisition | 9,668 | — | ||||||
| Accretion expense (note 23) | 2,800 | 3,106 | ||||||
| Change in estimate | (277 | ) | — | |||||
| Foreign exchange | 1,706 | (490 | ) | |||||
| Balance, end of period | 64,470 | 51,343 | ||||||
Provision for mine closure and restoration is related to the closure costs and environmental restoration associated with mining operations. The provisions have been recorded at their net present values, using a discount rate for each entity based on their life of mine and the corresponding country treasury bill rates of 11.73%, 10.02 %, and 7.22% at June 30, 2025 and December 31, 2024 for, Brazil, Mexico, and Honduras, respectively. The provisions have been re-measured at each reporting date, with the accretion expense being recorded as a finance cost.
| 19 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
16 OTHER PROVISIONS
| Long-term employee benefits | Provision for judicial contingencies | CVRs | Total | |||||||||||||
| At December 31, 2023 | 11,964 | 672 | — | 12,636 | ||||||||||||
| Periodic service and finance cost (Note 23) | 834 | — | — | 834 | ||||||||||||
| Change in provision for the period | 396 | 63 | — | 459 | ||||||||||||
| Settlement during the period | (296 | ) | — | — | (296 | ) | ||||||||||
| At June 30, 2024 | 12,898 | 735 | — | 13,633 | ||||||||||||
| At December 31, 2024 | 13,860 | 3,284 | — | 17,144 | ||||||||||||
| Periodic service and finance cost (Note 23) | 891 | — | — | 891 | ||||||||||||
| Change in provision for the period | 194 | 2,145 | — | 2,339 | ||||||||||||
| Actuarial changes | 294 | — | — | 294 | ||||||||||||
| Addition (Note 5) | — | — | 9,120 | 9,120 | ||||||||||||
| Settlement during the period | (1,811 | ) | — | — | (1,811 | ) | ||||||||||
| Foreign exchange | — | — | 490 | 490 | ||||||||||||
| At June 30, 2025 | 13,428 | 5,429 | 9,610 | 28,467 | ||||||||||||
17 OTHER LIABILITIES
| June 30, 2025 | December 31, 2024 | |||||||
| NSR royalty (note 17 (a)) | 1,060 | 971 | ||||||
| Lease payment obligation (note 17 (b)) | 27,830 | 24,251 | ||||||
| Total other liabilities | 28,890 | 25,222 | ||||||
| Current | 14,939 | 14,190 | ||||||
| Non-current | 13,951 | 11,032 | ||||||
a) NSR Royalty
The movements for the six months ended June 30, 2025 and 2024 of the NSR Royalty are as follows:
| June 30, 2025 | June 30, 2024 | |||||||
| Balance, beginning of year | 971 | 826 | ||||||
| Royalty payments | (981 | ) | (825 | ) | ||||
| Increase in NSR obligations | 1,070 | 854 | ||||||
| Balance, end of the period | 1,060 | 855 | ||||||
| 20 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
b) Lease Payment Obligation
The movements for the six months ended June 30, 2025 and 2024 of the lease liability obligation are as follows:
| June 30, 2025 | June 30, 2024 | |||||||
| Balance, beginning of year | 24,251 | 38,654 | ||||||
| Bluestone acquisition | 7 | — | ||||||
| Change in estimate | 6,236 | 1,123 | ||||||
| Accretion expense (Note 23) | 1,756 | 4,021 | ||||||
| Lease payments (Principal) | (7,557 | ) | (8,680 | ) | ||||
| Lease payments (Interest) | (1,804 | ) | — | |||||
| Foreign exchange | 4,941 | (5,040 | ) | |||||
| Balance, end of period | 27,830 | 30,078 | ||||||
| Current | 13,876 | 13,055 | ||||||
| Non-current | 13,954 | 17,023 | ||||||
The weighted average discount rate applied to the lease liabilities within the period ended June 30, 2025 is 11.73% (13.15% and 9% for the period ended June 30, 2024), based on their corresponding country treasury bill rates.
Lease liabilities are reflected within the current and long-term liabilities in the consolidated statements of financial position. The finance cost or amortization of the discount on the lease liabilities are charged to the consolidated statements of income using the effective interest method.
18 EQUITY
The Company has authorized an unlimited number of common shares, being subscribed 74,529,362 as of June 30, 2025 (72,399,495 as of December 31, 2024).
As of June 30, 2025, the Company had 1,500,992 options issued and outstanding (1,052,589 as of December 31, 2024). The share-based payment expense is measured at fair value and recognized over the vesting period from the date of grant, and for the six months period ended June 30, 2025 and 2024, share-based payment expense recognized in general and administrative expenses was $73 and $52 respectively. During the period ended June 30, 2025 the Company granted 448,398 new stock options.
| 21 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
Repurchase of shares
On March 14 2024, the Company announced a new normal course issuer bid (“New NCIB”) for its TSX listed shares and a buyback program for its Brazilian Depositary Receipts (“BDRs”) listed in the Brazilian Stock Exchange (“B3”). The limit for purchases under the NCIB and the BDR Buyback Program was a combined aggregate limit, representing, altogether, 2,261,426 Common Shares.
On March 24, 2025, Aura announced the renewal of its Normal Course Issuer Bid (NCIB) and concurrent Buyback Program for Brazilian Depositary Receipts (BDRs). The renewed NCIB allows the Company to repurchase up to 2.69 million common shares while the BDR program permits the repurchase of up to 8.08 million BDRs—each equivalent to one-third of a common share—on the B3.
For the period ended June 30, 2025 the Company has repurchased 162,826 common shares of its Brazilian Depositary Receipts and 20,424 common shares under the NCIB, for $849 and $351, respectively, for a total of $1,200 recorded directly in share capital. During this period, the Company has canceled (96,141) shares from the total repurchased.
19 REVENUE
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |||||||||||||
| Gold | 127,928 | 85,171 | 239,470 | 173,087 | ||||||||||||
| Copper & Gold concentrate | 60,875 | 50,716 | 113,632 | 95,866 | ||||||||||||
| Provisional prices | 686 | (1,476 | ) | (1,809 | ) | (2,464 | ) | |||||||||
| Other | 947 | — | 947 | — | ||||||||||||
| Revenue | 190,436 | 134,411 | 352,240 | 266,489 | ||||||||||||
Revenues for the Minosa, Apoena and Almas mines relate to the sale of refined gold and for the Aranzazu mine relates to the sale of copper concentrate. The Company’s revenues are concentrated in 5 clients (see Note 26(d)).
For the three and six-months period ended June 30, 2025, Brazil, Mexico and Honduras represented 38.1%, 32.5% and 29.4% and 34.5%, 22.2% and 43.4% respectively of the Company´s revenue (32.1%, 36.7% and 31.2% and 35.0%, 35.1 % and 29.9% for the period ended June 30, 2024).
For the period ended June 30, 2025, the
Company´s main clients Asahi Refining USA Inc, Trafigura México, S.A. de C.V. and Auramet International, represented 45.5%,
31.8% and 22.7% respectively of the Company´s revenue (22.1%, 31.1 % and 46.8 % for the period ended June 30, 2024).
| 22 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
20 COST OF GOODS SOLD BY NATURE
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |||||||||||||
| Direct mine and mill costs | (44,470 | ) | (36,203 | ) | (89,389 | ) | (75,062 | ) | ||||||||
| Direct mine and mill costs - Contractors | (17,529 | ) | (22,356 | ) | (32,996 | ) | (42,380 | ) | ||||||||
| Direct mine and mill costs - Salaries | (9,550 | ) | (9,762 | ) | (18,676 | ) | (20,167 | ) | ||||||||
| Depletion and amortization | (14,948 | ) | (14,782 | ) | (28,812 | ) | (30,891 | ) | ||||||||
| Total | (86,497 | ) | (83,103 | ) | (169,873 | ) | (168,500 | ) | ||||||||
21 GENERAL AND ADMINISTRATIVE EXPENSES
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |||||||||||||
| Salaries, wages, benefits and bonus | (5,047 | ) | (3,582 | ) | (8,827 | ) | (7,002 | ) | ||||||||
| Professional and consulting fees | (2,111 | ) | (1,278 | ) | (4,159 | ) | (2,878 | ) | ||||||||
| Legal fees | (214 | ) | (150 | ) | (458 | ) | (379 | ) | ||||||||
| Insurance | (194 | ) | (240 | ) | (390 | ) | (626 | ) | ||||||||
| Directors' fees | (584 | ) | (145 | ) | (1,255 | ) | (299 | ) | ||||||||
| Travel expenses | (213 | ) | (218 | ) | (574 | ) | (437 | ) | ||||||||
| Share-based payment expense (Note 18) | — | — | (73 | ) | (52 | ) | ||||||||||
| Depreciation and amortization | (335 | ) | (564 | ) | (534 | ) | (1,199 | ) | ||||||||
| Care and maintenance | (563 | ) | (375 | ) | (1,063 | ) | (796 | ) | ||||||||
| Other | (2,023 | ) | (979 | ) | (3,587 | ) | (2,142 | ) | ||||||||
| Total | (11,284 | ) | (7,531 | ) | (20,920 | ) | (15,810 | ) | ||||||||
22 EXPLORATION EXPENSES
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |||||||||||||
| Minosa | (264 | ) | — | (500 | ) | (1 | ) | |||||||||
| Almas | (423 | ) | — | (660 | ) | — | ||||||||||
| Apoena | (62 | ) | (122 | ) | (186 | ) | (170 | ) | ||||||||
| Aranzazu | (794 | ) | (1,656 | ) | (1,503 | ) | (2,766 | ) | ||||||||
| Borborema project | — | — | (70 | ) | — | |||||||||||
| All other segments | (171 | ) | (1,173 | ) | (171 | ) | (1,956 | ) | ||||||||
| Total | (1,714 | ) | (2,951 | ) | (3,090 | ) | (4,893 | ) | ||||||||
| 23 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
23 FINANCE EXPENSE
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |||||||||||||
| Accretion expense (Note 15) | (1,134 | ) | (1,573 | ) | (2,800 | ) | (3,106 | ) | ||||||||
| Lease interest expense (Note 17 (b)) | (161 | ) | (2,012 | ) | (1,756 | ) | (4,021 | ) | ||||||||
| Interest expense on loans and debentures (Note 24 (a)) | (6,098 | ) | (4,121 | ) | (11,853 | ) | (8,338 | ) | ||||||||
| Finance cost on post-employment benefit | (747 | ) | (467 | ) | (1,085 | ) | (834 | ) | ||||||||
| Unrealized loss with derivative gold collars (Note 25 (a) (ii)) | (24,304 | ) | (11,558 | ) | (124,514 | ) | (33,226 | ) | ||||||||
| Realized loss with derivative gold collars | (11,703 | ) | — | (17,739 | ) | — | ||||||||||
| Loss on other derivative transactions | (1,305 | ) | — | (3,132 | ) | — | ||||||||||
| Change in liability measured at fair value | (4,025 | ) | (954 | ) | (6,384 | ) | (3,587 | ) | ||||||||
| Foreign exchange | (2,462 | ) | (11,184 | ) | (5,638 | ) | (13,274 | ) | ||||||||
| Derivative fee | — | (13,522 | ) | — | (13,522 | ) | ||||||||||
| Loss on settlement of liability with equity instruments (Note 13) | (8,768 | ) | — | (8,768 | ) | — | ||||||||||
| Other finance costs | (297 | ) | (140 | ) | (727 | ) | (571 | ) | ||||||||
| Finance expenses | (61,004 | ) | (45,531 | ) | (184,396 | ) | (80,479 | ) | ||||||||
| Interest income | 1,374 | 429 | 3,155 | 1,282 | ||||||||||||
| Finance income | 1,374 | 429 | 3,155 | 1,282 | ||||||||||||
| Total finance result | (59,630 | ) | (45,102 | ) | (181,241 | ) | (79,197 | ) | ||||||||
24 CASH FLOW INFORMATION
a) Items adjusting (loss) of the period
| June 30, 2025 | June 30, 2024 | |||||||
| Deferred and current income tax expense | 41,525 | 32,488 | ||||||
| Depreciation and amortization | 29,346 | 31,553 | ||||||
| Accretion expense (Note 23) | 2,800 | 3,106 | ||||||
| Lease Interest expense (Note 23) | 1,755 | 4,021 | ||||||
| Interest expense on loans and debentures (Note 23) | 11,853 | 8,338 | ||||||
| Finance cost on post-employment benefit (Note 23) | 1,085 | 834 | ||||||
| Unrealized loss on derivatives gold collars (Note 23) | 124,514 | 33,226 | ||||||
| Loss on other derivatives (Note 23) | 3,132 | — | ||||||
| Foreign exchange loss (Note 23) | 5,638 | 13,274 | ||||||
| Change in fair value in liability measured at fair value | 6,384 | 3,587 | ||||||
| Share-based payment expense (Note 18) | 73 | 52 | ||||||
| Change in estimate for mine closure and restoration | — | (382 | ) | |||||
| Loss on disposal of assets | 436 | 577 | ||||||
| Loss on settlement of liability with equity instruments | 8,768 | — | ||||||
| Other non-cash items | 523 | 1,341 | ||||||
| Total | 237,832 | 132,015 | ||||||
| 24 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
b) Changes in working capital
| June 30, 2025 | June 30, 2024 | |||||||
| Increase in accounts receivables and value added taxes and other recoverable taxes | (2,126 | ) | (4,516 | ) | ||||
| Increase in inventory | (15,582 | ) | (11,024 | ) | ||||
| (Decrease) in trade and other payables | 6,945 | (1,593 | ) | |||||
| Total | (10,763 | ) | (17,133 | ) | ||||
c) Other current and non-current assets and liabilities
| June 30, 2025 | June 30, 2024 | |||||||
| Changes in other current and non-current assets and liabilities consists of: | ||||||||
| (Increase) Decrease in other receivables and assets (non-current) | 4,099 | 897 | ||||||
| (Increase) in other receivables and assets (current) | (79 | ) | 9,553 | |||||
| (Decrease) in other liabilities (current and non-current) | (5,450 | ) | 558 | |||||
| Total | (1,430 | ) | 11,008 | |||||
d) Non-cash transactions on investing activities consist of:
| June 30, 2025 | June 30, 2024 | |||||||
| Non-cash addition to property, plant and equipment | 10,728 | 577 | ||||||
| Total | 10,728 | 577 | ||||||
| 25 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
e) Loans, debentures and derivatives reconciliation
| Loans and debentures | Derivatives | |||||||
| Balance as of December 31, 2023 | 333,589 | 32,005 | ||||||
| Changes from Financing cash flows: | ||||||||
| Loan and debentures repayments | (23,312 | ) | — | |||||
| Loan proceeds | 34,000 | — | ||||||
| Interest paid on loans * | (12,647 | ) | — | |||||
| Interest paid on debentures * | (5,051 | ) | — | |||||
| Derivative settlement | — | 2,868 | ||||||
| Other Changes: | ||||||||
| Interest expenses on loans | 11,244 | — | ||||||
| Interest expenses on debentures | 4,429 | — | ||||||
| Derivative result | — | (1,244 | ) | |||||
| Foreign exchange adjustments | (7,835 | ) | 6,893 | |||||
| Derivative settlement (withholding taxes) | — | 506 | ||||||
| Swap fair value adjustment | — | 1,683 | ||||||
| Gold Hedges fair value adjustment | — | 33,226 | ||||||
| Balance as of June 30, 2024 | 334,417 | 75,937 | ||||||
| Balance as of December 31, 2024 | 443,104 | 139,490 | ||||||
| Acquisition of Bluestone | 5,900 | |||||||
| Changes from Financing cash flows: | ||||||||
| Loan and debentures repayments | (20,602 | ) | — | |||||
| Interest paid on loans * | (21,172 | ) | — | |||||
| Derivative settlement (Gold Hedges) | — | (17,739 | ) | |||||
| Derivative settlement - debt swap agreements | — | 2,582 | ||||||
| Other Changes: | ||||||||
| Interest expenses on loans | 10,395 | — | ||||||
| Interest expenses on debentures | 12,383 | — | ||||||
| Derivative result | — | (6,157 | ) | |||||
| Foreign exchange adjustments | 22,685 | (22,723 | ) | |||||
| Derivative settlement (witholding taxes) | — | 1,104 | ||||||
| Swap fair value adjustment | — | 3,417 | ||||||
| Gold Hedges fair value adjustment | — | 142,253 | ||||||
| Other derivatives fair value adjustment | 1,200 | 1,933 | ||||||
| Balance as of June 30, 2025 | 453,893 | 244,160 | ||||||
* Interest payment on loans and debentures are being presented under financing activities in the Condensed Interim Consolidated Statements of Cash Flows
| 26 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
25 FINANCIAL INSTRUMENTS AND FAIR VALUE MEASUREMENT
a) Financial Instruments
The Company has the following derivative financial instruments in the following line items in the consolidated statements of financial position:
| Asset/(Liability) at | Asset/(Liability) at | |||||||||
| Derivatives Contracts | Current/Non-Current | June 30, 2025 | December 31, 2024 | |||||||
| Swap - Aura Almas (Itaú Bank) | Non-current | 5,395 | (15,164 | ) | ||||||
| Swap - Apoena Mines (Bradesco and ABC Bank) | Current | (4,587 | ) | (3,872 | ) | |||||
| Gold Derivatives | Current / Non-current | (244,968 | ) | (120,454 | ) | |||||
| Total | (244,160 | ) | (139,490 | ) | ||||||
Classification of financial instruments
| June 30, 2025 | December 31, 2024 | |||||||||||||||||||||||||||
| Note | Measured at amortized cost | Fair value through profit & loss | Fair value through OCI | Measured at amortized cost | Fair value through profit & loss | Fair value through OCI | ||||||||||||||||||||||
| Assets | ||||||||||||||||||||||||||||
| Current | ||||||||||||||||||||||||||||
| Cash and cash equivalents | 6 | 167,938 | — | — | 270,189 | — | — | |||||||||||||||||||||
| Accounts receivable | 7 | 4,473 | — | — | 2,354 | 13,480 | — | |||||||||||||||||||||
| Derivative Financial Instrument | 25 | — | — | 5,395 | — | — | — | |||||||||||||||||||||
| Non-current | — | — | — | |||||||||||||||||||||||||
| Other receivables and assets | 10 | — | — | 2,419 | — | — | 3,454 | |||||||||||||||||||||
| 172,411 | — | 7,814 | 272,543 | 13,480 | 3,454 | |||||||||||||||||||||||
| Liabilities | ||||||||||||||||||||||||||||
| Current | ||||||||||||||||||||||||||||
| Trade and other payables | 12 | 111,155 | — | — | 98,067 | — | — | |||||||||||||||||||||
| Derivative Financial Instrument | 25 | — | 26,654 | — | — | 19,302 | ||||||||||||||||||||||
| Current portion of loan and debentures | 13 | 72,187 | 6,599 | — | 78,115 | 3,892 | — | |||||||||||||||||||||
| Liability measured at fair value | 14 | — | 4,850 | — | — | 3,362 | — | |||||||||||||||||||||
| Other liabilities | 18 | 14,939 | — | — | 14,190 | — | — | |||||||||||||||||||||
| Non-current | ||||||||||||||||||||||||||||
| Derivative Financial Instrument | 25 | — | 222,901 | — | — | 105,024 | 15,164 | |||||||||||||||||||||
| Non-Current portion of loan and debentures | 13 | 194,483 | 180,624 | — | 202,474 | 158,623 | — | |||||||||||||||||||||
| Liability measured at fair value | — | 17,689 | — | — | 14,387 | — | ||||||||||||||||||||||
| Other provisions | 16 | — | 9,610 | — | — | — | — | |||||||||||||||||||||
| Other liabilities | 17 | 13,951 | — | — | 11,032 | — | — | |||||||||||||||||||||
| 406,715 | 468,927 | — | 403,878 | 304,590 | 15,164 | |||||||||||||||||||||||
| 27 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
| i) | Swap agreements: |
As of June 30, 2025 and December 31, 2024, the Company has the following swap agreements:
| Asset/(Liability) at | Asset/(Liability) at | |||||||||||||
| Derivatives Contracts | Commodity/ index | Current/ Non-Current | June 30, 2025 | December 31, 2024 | ||||||||||
| Swap - Aura Almas (Itaú Bank) (a) | CDI | Current | 5,395 | (15,164 | ) | |||||||||
| Swap - Apoena Mines (Bradesco and ABC Bank) | CDI | Current | (4,587 | ) | (3,872 | ) | ||||||||
| Total | 808 | (19,036 | ) | |||||||||||
(a) The swap agreements from the Company´s subsidiary, Almas, was designated as a hedge accounting.
ii) Derivative Options
ii) a - Derivative Collars – Almas and Apoena
As of June 30, 2025, the Company had 8,632 outstanding zero cost put/call collars for the Almas Project. The zero-cost put/calls collars have floor prices of $1,558 and ceiling prices of $2,300 per ounce of gold. The expiration dates are in July 2025.
For Apoena Mines, as of June 30, 2025 Mineração Apoena S.A. had zero cost put/call collars for 3,750 ounces of gold with floor price of $1,400 and ceiling price of $2,100 per ounce of gold. The expiration dates are between July 2025 and December 2025.
ii) b – Derivative Collars Borborema Project
As of June 30, 2025, the Company had 225,996 ounces outstanding for the Borborema Project. The put/calls collars have floor prices of $1,745 and ceiling prices at $2,400 per ounce of gold expiring between July 2025 and June 2028.
The fair value effect of both the Derivative
Zero Cost Collars and the Derivative Collars Borborema Project for the three and six-months ended June 30, 2025 is ($24,304) and ($124,514),
respectively (($13,731) and ($33,226) for the three and six-months ended June 30, 2024 respectively), recorded as a finance expenses loss
in the financial statements.
| 28 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
As of the date of these Unaudited Condensed Interim Financial Statements, the Company and its subsidiaries have no agreements in place with financial institutions which would require the Company to post cash or any other type of collateral to cover fair value exposure against the Company.
b) Fair value of financial instruments
The Company measures certain of its financials assets and liabilities at fair value on a recurring basis and these are classified in their entirety based on the lowest level of input that is significant to the fair value measurement. There are three levels of the fair value hierarchy that prioritize the inputs to valuation techniques used to measure fair value:
| 1) | Level 1, which are inputs that are unadjusted quoted prices in active markets for identical assets or liabilities; |
| 2) | Level 2, which are inputs other than Level 1 quotes prices that are observable, either directly or indirectly, for the asset or liability; and, |
| 3) | Level 3, which are inputs for the asset or liability that are not based on observable market data. |
Additionally, the Company classifies derivative assets and liabilities in Level 2 of the fair value hierarchy as they are valued using pricing models which require a variety of inputs such as expected gold price.
The fair value of the Company’s financial assets and liabilities measured at fair value on a recurring basis at June 30, 2025 and December 31, 2024 are summarized in the following table:
| June 30, 2025 | December 31, 2024 | |||||||||||||||||||
Level
| Fair value through profit & loss | Fair value through OCI | Fair value through profit & loss | Fair value through OCI | ||||||||||||||||
| Assets | ||||||||||||||||||||
| Accounts receivable | 2 | — | — | 13,480 | — | |||||||||||||||
| Other receivables and assets | 1 | — | 2,419 | — | 3,482 | |||||||||||||||
| Derivative Financial Instrument | 2 | — | 5,395 | — | — | |||||||||||||||
| — | 7,814 | 13,480 | 3,482 | |||||||||||||||||
| Liabilities | ||||||||||||||||||||
| Debentures | 2 | 229,500 | — | 162,515 | — | |||||||||||||||
| Liability measured at fair value | 3 | 22,539 | — | 17,749 | — | |||||||||||||||
| Derivative Financial Instrument | 2 | 249,555 | — | 124,326 | 15,164 | |||||||||||||||
| Other provisions | 3 | 9,610 | — | — | — | |||||||||||||||
| 511,204 | — | 304,590 | 15,164 | |||||||||||||||||
| 29 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
Valuation inputs and relationships to fair value
The following table summarizes the quantitative information about the significant unobservable inputs used in level 3 fair value measurements:
| Description | Fair value at | Unobservable inputs | Inputs | Relationship of unobservable inputs to fair value | ||
| June 30, 2025 | December 31, 2024 | 2025 | 2024 | |||
| Liability measured at fair value (NSR agreement)) | 22,539 | 17,749 | Expected production of gold ounces | 747,704 | 747,704 | If expected production of gold ounces were 10% higher or lower, the fair value would increase/decrease by $1,604 |
| Contingent Value Rights (CVRs) | 9,610 | - | Commercial Production | (a) | - | (a) |
| (a) | The Company assessed the probability of achieving commercial production, which is defined on Note 5, over various time horizons, primarily within a 0 to 20-year range, while also recognizing a residual probability of timelines extending beyond 20 years. If expected commercial production probability varies by 10% on the lower and higher ends of these time horizons, the fair value would increase or decrease by $1,592. |
Valuation process
The finance department of the Company includes a team that performs the valuations of non-property items required for financial reporting purposes, including level 3 fair values.
The main level 3 inputs used by the Company are derived and evaluated as follows:
• Discount rates for financial assets and financial liabilities are determined using a capital asset pricing model to calculate a pre-tax rate that reflects current market assessments of the time value of money and the risk specific to the asset.
• Risk adjustments specific to the counterparties (including assumptions about credit default rates) are derived from credit risk gradings determined by internal credit risk management group.
• Probability of commercial production achievement and expected timing of payment.
There was no significant changes on the
key inputs into the Monte Carlo simulation model for the liability measured at fair value (NSR agreement) used for the period ended June
30, 2025.
| 30 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
26 FINANCIAL RISK MANAGEMENT
| a) | Liquidity risk |
Liquidity risk is the risk that the Company will not be able to meet its financial obligations as they fall due. The Company manages its liquidity risk through a planning and budgeting process, which is reviewed and updated, to help determine the funding requirements to support the Company’s current operations and expansion and development plans and by managing its capital structure as described in Note 27 below.
Aura’s objective is to ensure that there are sufficient committed financial resources to meet its short-term business requirements for a minimum of twelve months. In the normal course of business, Aura enters into contracts that give rise to commitments for future payments as disclosed in the following table:
| As of June 30, 2025 | Within 1 year | 2 to 3 years | 4 to 5 years | Over 5 years | Total | |||||||||||||||
| Trade and other payables | 111,155 | — | — | — | 111,155 | |||||||||||||||
| Loans and debentures | 90,580 | 248,039 | 159,208 | 26,160 | 523,987 | |||||||||||||||
| Provision for mine closure and restoration | 3,434 | 4,189 | 11,367 | 56,109 | 75,099 | |||||||||||||||
| Lease liabilities | 12,454 | 11,478 | 105 | 42 | 24,079 | |||||||||||||||
| Liability measured at fair value | 4,850 | 3,381 | 6,482 | 25,963 | 40,676 | |||||||||||||||
| 222,473 | 267,087 | 177,162 | 108,274 | 774,996 | ||||||||||||||||
| As of December 31, 2024 | Within 1 year | 2 to 3 years | 4 to 5 years | Over 5 years | Total | |||||||||||||||
| Trade and other payables | 98,067 | — | — | — | 98,067 | |||||||||||||||
| Loans and debentures | 84,518 | 196,356 | 146,976 | 46,140 | 473,990 | |||||||||||||||
| Provision for mine closure and restoration | 9,674 | 5,431 | 8,132 | 35,049 | 58,286 | |||||||||||||||
| Lease liabilities | 12,305 | 14,937 | — | — | 27,242 | |||||||||||||||
| Liability measured at fair value | 3,915 | 4,332 | 4,882 | 22,860 | 35,989 | |||||||||||||||
| 208,479 | 221,056 | 159,990 | 104,049 | 693,574 | ||||||||||||||||
As of June 30, 2025, Aura has cash and cash equivalents of $167,938 ($270,181 as of December 31, 2024) and net working capital of $33,396 ($200,462 as of December 31, 2024) (current assets, excluding restricted cash less current liabilities).
| 31 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
| b) | Currency risk |
Aura’s operations are located in Honduras, Brazil and Mexico, therefore, foreign exchange risk exposures arise from transactions denominated in foreign currencies. Although Aura’s sales are denominated in United States dollars, certain operating expenses of Aura are denominated in foreign currencies, primarily the Honduran lempira, Brazilian real, Mexican peso, Canadian dollar and Colombian peso.
Financial instruments that impact Aura’s net losses or other comprehensive losses due to currency fluctuations include cash and cash equivalents, accounts receivable, other long-term assets, accounts payable and accrued liabilities, short term loans and other provisions denominated in foreign currency.
At June 30, 2025 and December 31, 2024 , the Company had cash and cash equivalents of $167,938, and $270,189, respectively, of which, $135,588 ($229,525 in 2024) were in United States dollars, $198 ($265 in 2024) in Canadian dollars, $31,468 ($28,997 in 2024) in Brazilian real, $506 ($11,229 in 2024) in Honduran lempiras, $82 ($158 in 2024) in Mexican pesos, $28 ($14 in 2024) in Colombian Pesos, $62 ($0 in 2024) in Guatemalan Quetzals and $6 ($0 in 2024) in Barbadian Dollars. An increase or decrease of 5% in the United States dollar exchange rate to the currencies listed above could have increased or decreased the Company’s income for the year by $1,614.
| c) | Interest rate risk |
The Company’s policy is to minimize interest rate cash flow risk exposures on long-term financing. Longer-term borrowings are therefore usually at fixed rates. As of June 30, 2025, the Company is exposed to changes in market interest rates through a bank borrowing at SOFR interest rate at its subsidiary Aranzazu. All other borrowings are at fixed interest rates or are linked to a swap instrument, minimizing the risk of interest rate exposure. The Company concluded that its exposure to interest rates is immaterial.
| d) | Credit risk |
Credit risk is the risk that a counterparty fails to discharge an obligation to the Company. The Company is exposed to credit risk from financial assets including cash and cash equivalents held at banks, trade and other receivables. The credit risk is managed based on the Company’s credit risk management policies and procedures.
The credit risk in respect of cash balances held with banks and deposits with banks are managed via diversification of bank deposits.
| 32 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
At June 30, 2025, the Company believes that its trade credit risk is low due to the following reasons:
- For the sales of refined gold from Almas, Apoena e Minosa, the Company collects payments in advance of delivering its products to its clients.
- For the sale of copper and gold concentrate from Aranzazu, the Company sells its products to wholly-owned subsidiary of Trafigura Group Pte. Ltd, an investment grade company. The accounts receivable is generally collected within 15 days from the issuance of the invoice.
| e) | Market risk |
Commodity derivatives transactions – Gold collars
As mentioned in Note 25, the Company uses gold collars in order to mitigate the risk of decline in gold prices for a portion of its projected future production associated with the construction of new projects.
To calculate an expected increase / decrease in the fair value balances of potential increases or decrease in gold prices, the Company used a variation of plus or minus 10% change in gold prices in relation to the June 30, 2025 closing prices.
Liability measured at fair value
The Company entered a Net Smelter Return Royalty Agreement that contains more than one embedded derivative, that is being accounted at fair value through profit or loss, and it is exposed to gold prices that can affect its future cash flows.
Gold linked Loan
Borborema Inc entered into a Gold-Linked Loan with embedded derivatives measured at fair value through profit and loss that has quarterly payments of gold ounces that are exposed to gold prices that can affect its future cash flows.
The reasonably possible scenario of the potential effects on the statement of income (loss) from outstanding transactions, the Company used a variation in the closing and future gold price of 10%. To simulate the potential scenario to reflect the potential effects on the statement of income (loss) from outstanding transactions, the Company used a variation in the closing and future gold price of 10%. The sensitivity analysis of these derivative financial instruments is presented as follows:
| Instrument | Instrument´s main risk events | Reasonable scenario | $ Impact |
| Derivative financial instruments (Gold collars) | Gold price increase/decrease | D 10% | 75,000 |
| Liability measured at fair value | Gold price increase/decrease | D 10% | 2,254 |
| Loans and debentures (Gold linked loan) | Gold price increase/decrease | D 10% | 482 |
| 33 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
27 CAPITAL MANAGEMENT
Aura’s objectives in managing capital are to ensure sufficient liquidity is maintained in order to properly develop and operate its current projects and pursue strategic growth initiatives, to ensure that externally imposed capital requirements related to any debt obligations are complied with, and to provide returns for shareholders and benefits to other stakeholders. In assessing the capital structure of the Company, management includes in its assessment the components of shareholders’ equity and long-term debt. The Company manages its capital structure considering changes in economic conditions, the risk characteristics of the underlying assets, and the Company’s liquidity requirements. To maintain or adjust the capital structure, the Company may be required to issue common shares or debt, repay existing debt, acquire or dispose of assets, or adjust amounts of certain investments.
In order to facilitate management of capital, the Company prepares annual budgets which are updated periodically if changes in the Company’s business are considered to be significant. The Board of Directors of the Company reviews and approves all operating and capital budgets as well as the entering into any material debt obligations, and any material transactions out of the ordinary course of business, including dispositions, acquisitions and other investments or divestitures. In order to maintain or adjust the capital structure, the company may adjust the amount of dividends paid to shareholders, return capital to shareholders, and issue new shares to reduce debt.
On February 26, 2025 and May 5, 2025 Aura’s Board of Directors has declared and approved the payment of dividends for a total of $18.3 million and $29.8 million, respectively. These correspond to $0.25 per share and $0.08 per Brazilian Depositary Receipt (“BDR”) and $0.40 per share and $0.13 per BDR, respectively. The dividends were paid on March 28, 2025 and May 30, 2025 respectively.
28 RELATED PARTY TRANSACTIONS
Key Management Compensation
Total compensation paid to key management personnel (including based salaries, bonuses and other benefits), remuneration of directors and other members of key executive management personnel for the period ended June 30, 2025 and 2024 were $2,718 and $2,981, respectively.
Director’s fees
Management had issued 189,795 deferred stock units (DSUs) to certain directors and former directors of the Company in 2016. The DSUs are recognized at the fair value of the Company shares based on the provisions of the agreements and will be settled in cash. The balance of the DSUs as of June 30, 2025 is $2,197 ($1,216 as of December 31, 2024) and is included as part of Trade and other payables.
| 34 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
Iraja Royalty Payments
As part of the Apoena Mines transaction with Yamana Gold Inc. (“Yamana”), Mineracao Apoena S.A. (“Apoena”) entered into a royalty agreement (the “EPP Royalty Agreement”), dated June 21, 2016, with Serra da Borda Mineracao e Metalurgia S.A. (“SBMM”), Yamana’s wholly-controlled subsidiary. Commencing on and from June 21, 2016, Apoena would pay to SBMM a royalty (the “Royalty”) that is equal to 2.0% of Net Smelter Returns on all gold mined or benefited from Apoena (the “Subject Metals”) sold or deemed to have been sold by or for Apoena.
Effective as at such time as Apoena has paid the Royalty on up to 1,000,000 troy ounces of the Subject Metals, the Royalty shall without the requirement for any further act or formality, reduce to 1.0% of Net Smelter Returns on all Subject Metals sold or deemed to have been sold by or for Apoena.
On October 27, 2017, SBMM entered into an agreement (the “Royalty Swap Agreement”) with Iraja Mineracao Ltda., a company controlled by the same controlling group, a third-party company, for the swap of the EPP Royalty with the RDM Royalty (as defined in the Royalty Swap Agreement) with no change to the terms of the royalty calculation. Aura has incurred expenses of the related royalties of $1,548 in the period ended June 30, 2025 ($909: 2024).
Royalty Agreement for Aura Almas
The Company, through its wholly owned subsidiaries Almas, maintains a royalty agreement with Irajá Mineração Ltda.., a company controlled by the same controlling group of Aura, whereby the subsidiary pays 1.2% of the Net Smelter Returns on all gold mined or sold. Aura has incurred expenses of the related royalties of $6,200 in the period ended June 30, 2025.
Royalty Agreement for Matupá
The Company, through its wholly owned subsidiary Matupá, maintains a royalty agreement with Irajá Mineração Ltda., a company controlled by the same controlling group of Aura, whereby the subsidiary will pay 1.2% of the Net Smelter Returns on all gold mined or sold, from the moment that is declared commercial production. The subsidiary is currently in care and maintenance.
Dividends payable to Northwestern
Northwestern, a company controlled by the Chairman of the Board, is the majority shareholder of Aura with approximately 53.5% ownership as of June 30, 2025 (54.8% as of December 31, 2024).
| 35 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
In the six-month ended June 30, 2025, the Company paid to Northwestern the total amount of $25.7 million of dividends.
Employee withholding taxes payable to the Company
In March 2021, certain key executives exercised stock options and received Company shares, triggering a withholding tax obligation that the Company paid on their behalf, as required by local regulations. The Board authorized reimbursement over a period of up to 18 months (extended to September 2025), with interest at or above the Applicable Federal Rate (AFR). The balance was secured by Company shares valued at 150% of the amount due, with provisions for additional collateral or immediate repayment in the event of employment termination. As of December 31, 2024, the outstanding balance was $3,129, which was fully reimbursed by the executive in June 2025.
29 SEGMENT INFORMATION
The reportable operating segments have been identified as the Minosa Mine, Apoena Mine, the Aranzazu Mine, Almas Mine, and Borborema Project. The Company manages its business, including the allocation of resources and assessment of performance, on a project-by-project basis, except where the Company’s projects are substantially connected and share resources and administrative functions. The segments presented reflect the way in which the Company’s management reviews its business performance. Operating segments are reported in a manner consistent with the internal reporting provided to executive management who act as the chief operating decision makers. Executive management is responsible for allocating resources and assessing the performance of the operating segments.
During the period ended March 31, 2025, the Borborema Project was included as a reportable operating segment, as it became a distinct area of focus subject to regular review by Chief Operating Decision Maker (CODM). Additionally, the Projects and Corporate segments, which were previously reported separately, no longer meet the criteria for reportable segments. Accordingly, comparative information has been recast to reflect this change and are now presented as part of non-reportable segments.
| 36 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
For the periods ended June 30, 2025 and
2024, segment information is as follows:
| Reportable segments | ||||||||||||||||||||||||||||||||
| For the period ended June 30, 2025 | Minosa Mine | Apoena Mine | Aranzazu Mine | Almas Mine | Borborema Project | Total reportable segments | All other segments | Total | ||||||||||||||||||||||||
| Revenue | 103,838 | 53,064 | 112,770 | 78,878 | 3,690 | 352,240 | — | 352,240 | ||||||||||||||||||||||||
| Cost of goods sold, except depletion and amortization | (41,150 | ) | (21,155 | ) | (48,564 | ) | (29,078 | ) | (1,114 | ) | (141,061 | ) | — | (141,061 | ) | |||||||||||||||||
| Depletion and amortization | (2,382 | ) | (8,219 | ) | (12,739 | ) | (5,472 | ) | — | (28,812 | ) | — | (28,812 | ) | ||||||||||||||||||
| Gross profit | 60,306 | 23,690 | 51,467 | 44,328 | 2,576 | 182,367 | — | 182,367 | ||||||||||||||||||||||||
| General and administrative expenses | (2,301 | ) | (2,237 | ) | (3,290 | ) | (2,278 | ) | (294 | ) | (10,400 | ) | (10,520 | ) | (20,920 | ) | ||||||||||||||||
| Exploration expenses | (500 | ) | (186 | ) | (1,503 | ) | (660 | ) | (70 | ) | (2,919 | ) | (171 | ) | (3,090 | ) | ||||||||||||||||
| Operating income/(loss) | 57,505 | 21,267 | 46,674 | 41,390 | 2,212 | 169,048 | (10,691 | ) | 158,357 | |||||||||||||||||||||||
| Finance income/(expense) | (1,952 | ) | (5,947 | ) | (2,595 | ) | (1,014 | ) | (7,374 | ) | (18,882 | ) | (150,506 | ) | (169,388 | ) | ||||||||||||||||
| Interest in loans and debentures | (802 | ) | (2,186 | ) | (1,201 | ) | (7,174 | ) | (490 | ) | (11,853 | ) | — | (11,853 | ) | |||||||||||||||||
| Other (expense) income | 9 | 113 | (1,102 | ) | (26 | ) | 15 | (991 | ) | 298 | (693 | ) | ||||||||||||||||||||
| Income/(Loss) before income taxes | 54,760 | 13,247 | 41,776 | 33,176 | (5,637 | ) | 137,322 | (160,899 | ) | (23,577 | ) | |||||||||||||||||||||
| Current tax | (14,385 | ) | (1,525 | ) | (19,466 | ) | (13,099 | ) | — | (48,475 | ) | (1,890 | ) | (50,365 | ) | |||||||||||||||||
| Deferred tax | 742 | 1,656 | (449 | ) | 7,116 | (851 | ) | 8,214 | 626 | 8,840 | ||||||||||||||||||||||
| Income taxes | (13,643 | ) | 131 | (19,915 | ) | (5,983 | ) | (851 | ) | (40,261 | ) | (1,264 | ) | (41,525 | ) | |||||||||||||||||
| (Loss) / Profit for the year | 41,117 | 13,378 | 21,861 | 27,193 | (6,488 | ) | 97,061 | (162,163 | ) | (65,102 | ) | |||||||||||||||||||||
| Property, plant and equipment | 63,427 | 67,411 | 129,409 | 150,177 | 243,841 | 654,265 | 108,301 | 762,566 | ||||||||||||||||||||||||
| Total assets | 95,591 | 203,919 | 371,786 | 347,036 | 136,179 | 1,154,511 | 11,412 | 1,165,923 | ||||||||||||||||||||||||
| Total liabilities | 78,012 | 140,642 | 105,819 | 253,469 | 158,749 | 736,691 | 289,468 | 1,026,159 | ||||||||||||||||||||||||
| Purchase of property, plant and equipment | 3,171 | 14,137 | 14,416 | 9,787 | 54,728 | 96,239 | 5,027 | 101,266 | ||||||||||||||||||||||||
(1) Non Reportable segments are composed
by Matupá, Tolda Fria, Carajás and Cerro Blanco Projects and Corporate.
| 37 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
| Reportable segments | ||||||||||||||||||||||||||||||||
| For the period ended June 30, 2024 | Minosa Mine | Apoena Mine | Aranzazu Mine | Almas Mine | Borborema Project | Total reportable segments | All other segments | Total | ||||||||||||||||||||||||
| Revenue | 79,609 | 44,999 | 93,402 | 48,479 | — | 266,489 | — | 266,489 | ||||||||||||||||||||||||
| Cost of goods sold, except depletion and amortization | (44,421 | ) | (19,862 | ) | (46,890 | ) | (26,436 | ) | — | (137,609 | ) | — | (137,609 | ) | ||||||||||||||||||
| Depletion and amortization | (2,792 | ) | (11,887 | ) | (11,240 | ) | (4,972 | ) | — | (30,891 | ) | — | (30,891 | ) | ||||||||||||||||||
| Gross profit | 32,396 | 13,250 | 35,272 | 17,071 | — | 97,989 | — | 97,989 | ||||||||||||||||||||||||
| General and administrative expenses | (2,391 | ) | (1,427 | ) | (2,244 | ) | (1,997 | ) | (331 | ) | (8,390 | ) | (6,624 | ) | (15,014 | ) | ||||||||||||||||
| Care-and-maintenance expenses | — | (578 | ) | — | — | — | (578 | ) | (218 | ) | (796 | ) | ||||||||||||||||||||
| Exploration expenses | (1 | ) | (170 | ) | (2,766 | ) | — | (56 | ) | (2,993 | ) | (1,900 | ) | (4,893 | ) | |||||||||||||||||
| Operating income/(loss) | 30,004 | 11,075 | 30,262 | 15,074 | (387 | ) | 86,028 | (8,742 | ) | 77,286 | ||||||||||||||||||||||
| Finance income/(expense) | (2,789 | ) | (3,452 | ) | 351 | (1,162 | ) | (17,844 | ) | (24,896 | ) | (45,963 | ) | (70,859 | ) | |||||||||||||||||
| Interest in loans and debentures | (1,047 | ) | (2,988 | ) | (1,099 | ) | (3,325 | ) | 121 | (8,338 | ) | — | (8,338 | ) | ||||||||||||||||||
| Other (expense) income | (590 | ) | 90 | (927 | ) | (19 | ) | (1 | ) | (1,447 | ) | 854 | (593 | ) | ||||||||||||||||||
| Income/ (Loss) before income taxes | 25,578 | 4,725 | 28,587 | 10,568 | (18,111 | ) | 51,347 | (53,851 | ) | (2,504 | ) | |||||||||||||||||||||
| Current tax | (8,508 | ) | (1,882 | ) | (12,291 | ) | (2,074 | ) | — | (24,755 | ) | — | (24,755 | ) | ||||||||||||||||||
| Deferred tax | (235 | ) | (1,625 | ) | 1,061 | (6,243 | ) | — | (7,042 | ) | (691 | ) | (7,733 | ) | ||||||||||||||||||
| Income taxes | (8,743 | ) | (3,507 | ) | (11,230 | ) | (8,317 | ) | — | (31,797 | ) | (691 | ) | (32,488 | ) | |||||||||||||||||
| (Loss) / Profit for the year | 16,835 | 1,218 | 17,357 | 2,251 | (18,111 | ) | 19,550 | (54,542 | ) | (34,992 | ) | |||||||||||||||||||||
| Property, plant and equipment | 55,543 | 73,842 | 123,463 | 145,464 | 93,700 | 492,012 | 24,730 | 516,742 | ||||||||||||||||||||||||
| Total assets | 70,437 | 179,757 | 299,020 | 162,648 | 179,680 | 891,542 | (9,560 | ) | 881,982 | |||||||||||||||||||||||
| Total liabilities | 83,603 | 150,019 | 60,369 | 113,254 | 140,406 | 547,651 | 86,125 | 633,776 | ||||||||||||||||||||||||
| Purchase of property, plant and equipment | 2,069 | 2,720 | 13,047 | 5,506 | 29,936 | 53,278 | — | 53,278 | ||||||||||||||||||||||||
(1) Non Reportable segments are composed by Matupá, Tolda Fria, Carajás and Cerro Blanco Projects and Corporate.
30 COMMITMENTS AND CONTINGENCIES
a) Operating leases commitments
The Company has the following commitments for future minimum payments under operating leases:
| 2025 | |||
| Within 1 year | 12,454 | ||
| 2 years | 5,739 | ||
| 3 years | 5,039 | ||
| 4 years | 805 | ||
| Over 5 years | 42 | ||
| Total | 24,079 | ||
| 38 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
b) Contingencies
Certain conditions may exist as of the date of these financial statements which may result in a loss to the Company in the future when certain events occur or fail to occur. The Company assesses at each reporting date its loss contingencies related to ongoing legal proceedings by evaluating the likelihood of such proceedings, as well as the amounts claimed or expected to be claimed. Included in other provisions as of June 30, 2025, is a provision of $5,429 ($3,284 as of December 31, 2024) for loss contingencies related to ongoing legal claims.
31 INCOME/(LOSS) PER SHARE
Basic income per share is calculated by dividing the income attributable to owners of the Company by the weighted average number of ordinary shares outstanding during the year.
Diluted income per share is calculated using the “treasury stock method” in assessing the dilution impact of convertible instruments until maturity. The treasury stock method assumes that all convertible instruments until maturity have been converted in determining fully diluted profit per share if they are in-the-money, except where such conversion would be anti-dilutive. In the event of a share consolidation or share division, the calculation of basic and diluted loss per share is adjusted retrospectively for all periods presented.
The following table summarizes activity for the three and six months period ended June 30, 2025 and 2024:
| For the three months ended June 30, 2025 | For the three months ended June 30, 2024 | For the six months ended June 30, 2025 | For the six months ended June 30, 2024 | |||||||||||||
| Profit/(loss) for the period | 8,147 | (25,775 | ) | (65,102 | ) | (34,992 | ) | |||||||||
| Weighted average number of shares outstanding - basic | 74,328,457 | 72,342,498 | 73,771,206 | 72,290,638 | ||||||||||||
| Weighted average number of shares outstanding - diluted | 75,199,163 | 72,342,498 | 73,771,206 | 72,790,638 | ||||||||||||
| Total profit/(loss) per share - basic | 0.11 | (0.36 | ) | (0.88 | ) | (0.48 | ) | |||||||||
| Total profit/(loss) per share - diluted | 0.11 | (0.36 | ) | (0.88 | ) | (0.48 | ) | |||||||||
| 39 | Aura Minerals Inc. |
Aura Minerals Inc.
Notes to the Unaudited Condensed Interim Consolidated Financial Statements
For the three and six months ended June 30, 2025
Expressed in thousands of United States dollars, except where otherwise noted.
32 SUBSEQUENT EVENTS
U.S. Initial Public Offering
On July 17, 2025, the Company closed its U.S. Initial Public Offering (“IPO”) of 8,100,510 common shares at a public offering price of US$24.25 per share. The registration statement on Form F-1 relating to the offering was declared effective by the U.S. Securities and Exchange Commission on July 15, 2025. The Company’s common shares began trading on the Nasdaq Global Select Market under the ticker symbol “AUGO” on July 16, 2025.
In connection with the offering, the Company granted the underwriters a 30-day option to purchase up to an additional 1,215,077 common shares at the public offering price, less underwriting discounts and commissions. The Company has been notified that the underwriters intend to exercise this option.
| 40 | Aura Minerals Inc. |