Cadeler plc 6-K, filed Nov 23, 2026
Cadeler plc (CDLR)
6-K
2026-11-23
For: 2026-11-23
View Original
Added on
November 23, 2026
About this 6-K
Cadeler plc filed this 6-K on November 23, 2026.
Cadeler plc reported Q3 2026 revenue up 65% versus Q3 25, with EBITDA reflecting higher project-specific and transaction costs. Contract backlog stood at EUR 2.4 billion. Profit after tax decreased by EUR 10m to EUR 55m, while Hornsea 3 passed the half-way mark of monopile installation. AI summary
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13A-16 OR 15D-16 OF THE
SECURITIES EXCHANGE ACT OF 1934
For the month of November 2026
Commission File Number: 333-298599
CADELER PLC
(Translation of registrant's name into English)
Avocet Court
8 Central Avenue
St. Andrews Business Park
Norwich, Norfolk NR7 0HR
United Kingdom
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
Form 20-F x Form 40-F o
INFORMATION CONTAINED IN THIS FORM 6-K REPORT
On November 23, 2026, members of the executive management of Cadeler plc (the “Company”) delivered the investor presentation attached hereto as Exhibit 99.1 in connection with the release of the Company’s financial results as of and for the nine months ended September 30, 2026.
| Exhibit No. | Description | ||||
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
Date: November 23, 2026 CADELER PLC
(Registrant)
By: /s/ Mikkel Gleerup
Name: Mikkel Gleerup
Title: Chief Executive Officer
Name: Mikkel Gleerup
Title: Chief Executive Officer
Investor Presentation Q3 2026 1 January – 30 September 2026 23rd November 2026
Disclaimer This presentation (this “Presentation") has been prepared by Cadeler plc (the “Company") exclusively for information purposes and may not be reproduced or redistributed, in whole or in part, by any other person. Forward-looking statements This Presentation contains certain forward-looking statements within the meaning of Section 27A of the U.S. Securities Act of 1933 and Section 21E of the U.S. Exchange Act of 1934, each as amended. All statements other than statements of historical fact included in this Presentation are forward-looking statements, including those regarding future guidance, such as those related to anticipated revenue, EBITDA and Adjusted EBITDA. Forward looking statements involve risks, uncertainties and assumptions, and actual results may differ materially from any future results expressed or implied by such forward-looking statements. Words such as "anticipate," "believe ," "continue," "could,“ "estimate," "expect," "intend," "may," "might,“ “forecast”, “on track,” "plan," “possible,” “potential,” “predict,” "project," "should," "would," "shall," “target,” "will" and similar expressions are intended to assist in identifying forward looking statements. Although the Company believes that the expectations reflected in such forward-looking statements are reasonable, there can be no assurance that such expectations will prove to be correct. All forward-looking statements included in this Presentation speak only as of the date of this Presentation and the Company undertakes no obligation to revise or update any forward-looking statement for any reason, except as required by law. Risks and uncertainties include, but are not limited to, those detailed in the Company’s most recent annual report on Form 20-F and in its other filings with the U.S. Securities and Exchange Commission. You should consider these risks and uncertainties when evaluating the Company and its prospects. None of the Company or any of its parent or subsidiary undertakings or any of such persons’ directors, officers or employees provides any assurance that the assumptions reflected in the forward-looking statements included in this Presentation are free from error nor does any of them accept any responsibility for the future accuracy of the opinions expressed in this Presentation or the actual occurrence of the forecasted developments. Non-IFRS performance measures This Presentation includes certain Non-IFRS performance measures, including EBITDA, Adjusted EBITDA, and contract backlog. Such Non-IFRS performance measures are presented herein as the Company believes that such measures provide investors with additional useful information and a means of understanding how the Company’s management evaluates the Company’s operating performance. Such performance measures should not, however, be considered in isolation from, as substitutes for, or as superior to financial measures prepared in accordance with IFRS. Moreover, other companies may define Non-IFRS measures differently, which limits the usefulness of these measures for the purpose of any comparison with such other companies. Industry and market data Information contained in this Presentation concerning the Company’s industry and the market in which it operates, including general expectations about its industry, market position, market opportunity and market size, is based on data from various sources including internal data and estimates as well as third party sources such as independent industry publications, government publications, and reports by market research firms or other published independent sources. You are cautioned not to give undue weight to such information. You are further advised that any third-party information referred to in this Presentation has not been prepared specifically for inclusion in this Presentation and while the Company believes such information to be generally reliable, it has not undertaken any independent investigation to confirm the accuracy or completeness of such information or to verify that more recent information is not available. 2
Q3 2026 - Highlights Revenue up 65% vs Q3 25 while EBITDA reflects higher project-specific costs and transaction costs Robust contract backlog of EUR 2.4 billion provides solid earnings visibility Menck integration continues according to plan Continued solid execution across the globe Hornsea 3 has passed the half-way mark of monopile installation Increasing commercial momentum with a substantial firm contract in 2027 & 2028 for Wind Apex and exclusivity for both foundation and WTG installation at a large-scale offshore wind farm in the UK from 2030 3
Commercial highlights Q3 2026 4
Executing on projects Deep-dive on Hornsea 3 next 5 Wind Orca Secondary Steel installation at the Hornsea 3 project for Ørsted Wind Osprey WTG installation at the EA3 project for ScottishPower Renewables Wind Scylla WTG installation at the Sunrise Wind project for Ørsted Wind Zaratan Carried out maintenance work scopes and leg extension in Singapore before sailing to Europe (on HLV) Wind Peak Nexra O&M campaign for Siemens Gamesa Wind Pace WTG installation at the Hornsea 3 project for Ørsted Wind Keeper On a Long-Term Agreement with Vestas Wind Ally Monopile installation at the Hornsea 3 Foundation installation project for Ørsted Wind Mover WTG installation on the Inch Cape project in the North Sea Wind Ace In transit from China to Europe to start the EA2 Foundation installation project Wind Maker Nexra O&M campaign for Siemens Gamesa Note: Vessel activity up until Q3 ’26 announcement date (23rd Nov 2026).
Vessel technical downtime during Q3 Wind MakerWind Orca 6 Incident in Port of Tyne has led to Wind Orca being out of operations for a short period of time. The vessel is recovering the lost time on Hornsea 3 and the root cause is being addressed through fleet- wide measures. Wind Maker is challenged by an industry-wide issue with rapid wire rope degradation causing unplanned technical downtime and additional cost. We have been working in close collaboration with our supplier to mitigate the impact and will continue work on a permanent solution with the OEM in Q1 27.
Hornsea 3 project update Full speed ahead: past the halfway mark on monopiles, wind turbine installation has begun • Execution on the Ørsted Hornsea 3 project continues: Wind Ally and Wind Orca and the chartered SOV are installing, and net round- trip durations continue to reduce. • Monopile installation continues at pace with Wind Ally and is beyond halfway mark. Wind Orca is installing Secondary Steel and is closing the gap. • Monopile logistics progressing with 3 Heavy Transport Vessels on charter. Over 150 monopiles have been loaded into the marshalling port. • Wind Pace delivered to Ørsted and loaded with 6 sets of turbines. Currently on first installation cycle. Selected moments from the projectProject update 7
Significant backlog across key markets A EUR 2.4b backlog provides solid earnings visibility Europe APAC Fengmiao WTG – 2027 North America Baltic Power WTG – 2026 Sofia O&M – 2026 East Anglia THREE WTG – 2026 Hornsea 3 FOU & WTG – 2026 Baltica 2 WTG – 2027 Inch Cape WTG – 2026 East Anglia TWO FOU & WTG – 2027 Bałtyk II & III WTG – 2027 Sunrise Wind WTG – 2026 O&M + WTG – 2026 Formosa 4 WTG – 2028 US projects contribute to ~4% of total backlog BC-Wind WTG – 2028 Undisclosed client FOU & WTG – 2029 Region as % of total backlog 89% 7% 4% O&M – 2026 Dogger Bank C WTG – 2027 Vessel Reservation Agreements / Preferred Supplier Agreements (not in backlog) Undisclosed client WTG – 2030 & 2031 Undisclosed client FOU & WTG – 2030 & 2031 Undisclosed client O&M LTA Undisclosed client FOU – 2028 8
Contract backlog remains strong at EUR 2.4 billion Development in contract backlog FY 2022 – Q3 2026 • November 2026: firm contract to support the transportation and installation of turbines at Dogger Bank C in the UK, commencing in Q3 2027 Notable Awards Development in contract backlog FY 2022 – Q3 2026 1. Figures are for period-end, except that the contract backlog provided for Q3 2026 is as of 23 November 2026 (the date of this presentation). 2. Figures provided for FY 2022 and H1 2023 exclude the contribution to the contract backlog resulting from Cadeler’s business combination with Eneti Inc., completed in December 2023. 3. Contract backlog assumes 100% of counterparty options are exercised. Of the total contract backlog, EUR 2,035m represents firm contracted days and EUR 380m represents days subject to the exercise of counterparty options. 4. 76% of the contract backlog (an aggregate of EUR 1,847m) relates to projects for which the relevant counterparty has taken a positive final investment decision (FID). 5. Contract backlog excludes vessel reservation agreements and preferred supplier agreements. (EURm) 2 22 2 23 2 2 2 2 2 23 2 2 2 2 2 26 2 26 3 2 26 3 36 2 336 2 22 2 66 2 2 2 3 6 3 2 2 3 3 26 3 2 2 2 2 3 3 2 3 3 2 6 3 2 3 of total backlog has reached FID t on m Vessel Reservation Agreements / Preferred Supplier Agreements (not included in backlog) • FOU installation project in 2028 • WTG installation project in 2030 & 2031 • FOU & WTG installation project in 2030 & 2031 • O&M Long-Term Agreement 9 Excluding Menck backlog
Progress on newbuild 10 Vessel Progress update Expected delivery % completion • Steel cutting was finalised in July 2025. • The vessel was launched on the 20 October 2026. • Engine room systems are being commissioned. • Boom installation in progress. • Main crane installation is in progress. • Sea fastening fabrication is under way. • Sea trials are scheduled for end-Q1 2027. Q2 2027 Wind Apex 87% First engine started Wind Apex at quay side Installation of main crane
Financial highlights Q3 2026
Financial highlights Q3 2026 Market Capitalisation2Revenue Equity Ratio Utilisation1 3-month Daily Average Turnover5 Adjusted EBITDA3 Net Profit Backlog4 € 2.2b € .5m € 1.9m (NYSE) / 3.3m (OSE) / 2.3m (other exchanges) Note: Numbers shown in the presentation are for Cadeler Group and therefore including Menck financial numbers. Backlog and Utilisation are excluding Menck; 1) Adjusted utilisation which means adjusted for planned off-hire including drydock and transportation from shipyard; 2) Combined market capitalisation at closing on 19 Nov 2026; 3) Adjusted for Menck transaction costs of EUR 7.2m; 4) Backlog Q3 2025 is for period-end, and backlog provided for Q3 2026 is as of 23 November 2026 (the date of this presentation); 5) Three-month Average Daily Trading Volume (ADTV) multiplied by Volume Weighted Average Price (VWAP). All prices have been converted to euro using the daily exchange rate. The category “other” entails trades facilitated by the interoperability among clearing corporations on different exchanges. No pricing data available for these transactions. The VWAP for OSE has been applied as a proxy. NYSE reflects ADSs to 4 November and ordinary shares from 5 November 2026 following the UK redomiciliation. € 55. m . . 3 2 2 3 2 26 2 2 Unadj. Adj. € . m € 55. m 3 2 2 3 2 26 2 2 € . 3 2 2 3 2 26 3 Unadj. Adj. 12 3 2 2 3 2 26 2 3 2 3 2 2 3 2 26 6 6 3 2 2 3 2 26 2 3 Unadj. Adj.
Note: Numbers shown in the presentation are for Cadeler Group and therefore including Menck financial numbers; 1) Vessel OPEX per day based on crewing costs, technical costs and insurance. e enue o t o a e o o t and ot e e en e e at n o t nance net o t e o e ncome ta ncome ta e en e o t a te ta an act on co t ( enc d u ted e e ( e da o o o ned e e 3 2 26 2 6 ( 2 6 3 (36 6 2 ( 6 2 3 2 3 2 3 3 2 2 2 ( 2 6 ( 6 3 ( 2 66 (2 6 6 2 2 3 3 Consolidated P&L for Q3 2026 13 Key takeaways • Revenue for the third quarter of 2026 increased by EUR 101m to EUR 255m compared to the same period in 2025, driven by higher contracted days following fleet expansion and EUR 24m of revenue from Menck since its acquisition on 11 August 2026. • Fleet utilisation was 78% (2025: 92%), reflecting transport period for Wind Ace following delivery and Zaratan undergoing upgrade work. Adjusted utilisation was 91% (2025: 92%). • Cost of sales increased by EUR 99m to EUR 157m, driven by operating costs and vessel depreciations from fleet expansion, project-specific costs on foundation transport and installation scopes, and EUR 14m from Menck. • SG&A increased by EUR 21m to EUR 37m, including transaction costs related to the Menck acquisition (EUR 7.2m year to date), continued scaling of onshore functions and Menck SG&A since acquisition. • EBITDA increased by EUR 4m to EUR 113m. Adjusted EBITDA, excluding Menck transaction costs, was EUR 120m. • Profit after tax decreased by EUR 10m to EUR 55m, driven by Menck transaction costs.
Note: Numbers shown in the presentation are for Cadeler Group and therefore including Menck financial numbers; 1) Vessel OPEX per day based on crewing costs, technical costs and insurance. Consolidated P&L for 9M 2026 14 Key takeaways • Comparability to 2025 is impacted by EUR 111m of non-recurring termination fees recognised in H1 2025, which materially benefited earnings without associated operating costs. • Revenue for the first nine months of 2026 increased by EUR 210m to EUR 663m, primarily driven by higher contracted days following fleet expansion and EUR 24m of revenue from Menck. • Fleet utilisation was 70% (2025: 76%), reflecting transport periods as new vessels entered operation and Zaratan undergoing upgrade work. Adjusted utilisation was 87% (2025: 90%). • Cost of sales increased by EUR 245m to EUR 404m, driven by operating costs and vessel depreciations from fleet expansion, project-specific costs on foundation transport and installation scopes, and EUR 14m from Menck. • SG&A and other expenses increased by EUR 30m to EUR 77m, reflecting EUR 7.2m of Menck transaction costs, continued scaling of onshore functions and Menck SG&A since acquisition. • EBITDA decreased by EUR 1m to EUR 321m (9M 2025: EUR 322m including the termination fees). Adjusted EBITDA, excluding Menck transaction costs, was EUR 328m. • Profit after tax decreased by EUR 89m to EUR 143m, driven by the termination fees in the prior period and Menck transaction costs. e enue o t o a e o o t and ot e e en e e at n o t nance net o t e o e ncome ta ncome ta e en e o t a te ta an act on co t ( enc d u ted e e ( e da o o o ned e e eadcount on o e ( e a e 2 26 662 ( 3 6 2 ( 6 62 2 2 ( 2 6 3 2 2 6 32 32 6 3 3 2 2 2 ( 26 2 3 ( 6 322 2 63 ( 3 23 2 ( 6 232 3 32 6 32 6 3 6 6 2
Consolidated Balance Sheet for Q3 2026 on u ent et a t e u ent et ota et u t on cu ent a t e u ent a t e ota u t and a t e u t at o 2 26 3 6 22 3 6 2 3 6 6 2 2 2 3 26 6 23 2 3 6 6 6 3 6 6 6 6 3 3 6 6 6 15 Key takeaways • Total assets increased by EUR 1,060m to EUR 4,477m since year- end 2025 (a 31% increase), of which the Menck acquisition accounted for approximately 19 percentage points, mainly intangible assets including provisional goodwill of EUR 163m. PP&E increased by EUR 484m, reflecting newbuilds and vessel upgrades. • Equity increased to EUR 1,851m, an increase of EUR 347m from year-end 2025 (EUR 1,504m), driven by the EUR 170m net proceeds from the March 2026 share capital increase, EUR 143m profit for the period and changes in the fair value and cost of hedges. The equity ratio decreased to 41% from 44% at year-end 2025. • Non-current liabilities increased by EUR 317m, mainly reflecting the drawdown for Wind Ace and the increased HoldCo facility. • Current liabilities increased by EUR 395m, reflecting the Menck bridge facility (EUR 380m drawn) • The Group was compliant with all financial covenants as of 30 September 2026. Note: Numbers shown in the presentation are for Cadeler Group and therefore including Menck financial numbers.
Near-term use of funds Net funding post 30 September 2026 Capital funding & usage (EURm) Note: Exchange rate of EUR/USD 1.1352 as per 30/09-2026 16 a nanc n d e oan et u d t et u d t o t e nanc n e a eout ac t e nanc n (net uee e ut a nd o 3 nd a n a a e 3 3 2 (263 2 262 Financing activities Squeeze-Out Newbuilds • Squeeze-Out financed by Bridge Loan having no net effect on liquidity • New EUR 925m Takeout Facility refinancing Menck Bridge Loan, EUR 550m Facility and Keeper Facility • Wind Apex facility of EUR 247m signed on 10 July 2026 including pre-delivery financing of EUR 60m drawn in November 2026 • Wind Ace Mission Equipment tranche of EUR 33m drawn in November 2026 Events not reflected • Wind Ace; additional CapEx for mission equipment at project start. • Newbuild contracts for two T-class vessels signed 10 August with a committed CapEx of approx. EUR 805m in aggregate. Only EUR 120m (first instalments) reflected in figures. • Cash flow from operations post 30 September 2026. Key takeaways
Financing overview as of 30 September 2026 Note: Numbers shown in the presentation include Menck. 1) Utilised as per 30/09-2026. 17 omm tted nanc n ncomm tted nanc n ota e e c a c a a atan c a c a a atan tota c a c a c a nd ee e e o o ate o o ate uee e ut d e ac t enc d e oan ota comm tment ota uncomm tment ac t e m oan nd cated nd cated nd cated a e out nd cated tanda d a te ed o d a ta d e ac t d e ac t omm tment 2 2 22 36 3 2 2 22 3 2 3 2 3 ut tand n 2 2 322 36 3 6 2 3 2 332 2 332 omment
Full Year Outlook for 2026 FY 2026 impacted by: • Full year outlook for 2026 and financial numbers for Q3 2026 reflects Cadeler Group and is therefore including Menck financial numbers. • Strong market demand (backlog) and high vessel utilisation across the Cadeler fleet. • Wind Orca and Wind Ally executing ade e ’ full-scope foundation transportation & installation campaign for Hornsea 3. • Nexra expected to benefit from growing demand for O&M work in the offshore wind industry. • Wind Keeper in operation on a long-term contract. • Wind Ace delivered on schedule on 17 July and is currently preparing for East Anglia TWO in 2027. • Menck expects to complete the sale of a made-to-order hammer (4400S) in Q4 2026. 18 e enue d u ted 3 2 26 ctua 2 2 2 26 ctua 663 32 2 26 ut oo 3 2
Commercial outlook 19
Market outlook Momentum in offshore wind continues to build, with increasing visibility into demand Cumulative additions by region ex-China1 (in GW) 1. Source: Aegir Recent development • Global need for electricity is on the rise; offshore wind will be an essential part of the solution • Ongoing geopolitical tensions and volatility in energy markets reinforce the need for locally-produced energy, energy security and affordability • We are experiencing increased momentum for the next decade • Substantial auction pipeline to be decided in the coming months: ance’ and out o ea’ 2 ound n particular • APAC continues to scale: South Korea has already awarded 1.8 GW in the H1 round and could reach up to ~4 GW awarded capacity, subject to H2 round • Capacity awarded globally year-to-date stands at 16 GW, already above the 2025 total. Strong award volumes expected across 2026–27 as the major current European rounds conclude 6 2 26 2 2 2 2 2 2 2 3 2 3 2 32 2 33 2 3 2 3 22 2 me ca 20
Cadeler has the largest fleet of vessels capable of efficient installation and O&M of wind turbines and foundations 3 3 3 2 2 2 3 3 2 2 # of wind turbine and foundation installation vessels Note: Selected players in the industry where an owned vessel either has a pipeline of installation work or will be a value driver in O&M work as estimated by Cadeler management. Includes vessels under construction. Source: 4C Offshore and public filings Maersk World’s largest and most versatile fleet of next-generation offshore wind turbine and foundation installation vessels. Improved customer value proposition through increased flexibility, redundancy and reduced risk of project slippage. e ac e u d nce 2 2 1 vessel becoming a full- time O&M asset 21
Integrating technology to gain further efficiency The largest fleet in the industry is also the largest dataset in the industry 22 50m+ operational data points — the largest pool in the offshore installation industry Our ambition • Leverage the largest pool of operational data for industry-wide insights • Use the latest AI technology to support quicker analysis and fast decision-making, for example in respect of complex soil conditions • Make operational data available in real time, on board and onshore, rather than after the campaign closes • Spot trends and patterns early enough to act on them, reduce delays and improve efficiency campaign by campaign • Carry what we learn on one project directly into the next
aa Key investment highlights Largest, most capable and versatile fleet and mission critical equipment = redundancy for clients Strong relationships and partnerships, industry leading position Global reach and experience, most foundations installed by any company in the industry Structural undersupply and increasing market demand 50m+ data points turning experience into industry-wide insights and next- generation of installation technology