Cadeler plc Investor Event Transcript, Nov 23, 2026

Cadeler plc (CDLR)

Cadeler plc reported Q3 revenue of 255.1 million, up 65% versus the third quarter in 25, and a backlog of around 2.4 billion euro. Hornsea 3 passed the halfway mark, while Wind Apex had an 87% completion rate and was on track for delivery in Q227. The company maintained its full-year outlook for revenue of 910 million euros to 1 billion and adjusted EBITDA of 435 to 525 million euros. AI summary

Investor Event Transcript 2026-11-23 For: 2026-12-31
Added on November 23, 2026

Investor Update Transcript - CDLR 2026-11-23

Layla, Analyst — OpenExchange

Yeah, one of us will get it.

Mikkel Gleerup, CEO

I'm in the speaker room. I'll do it from here. That's fine.

Layla, Analyst — OpenExchange

Okay, great.

Damien, Other

Yeah, perfect. Thank you. Okay, perfect.

Operator

All right. So Joe, my Q&A is on the top. All right. What is next? All right. So when we start the Q&A, what I'll do is I'll switch to the. All right, so during the Q&A intro, I'll put this up, and when they start, I'll switch to the speakers, and along with, I'll add one more spotlight, whoever is asking the question. And, yeah, we'll keep it on, and, yeah, that's it, right?

Damien, Other

Well, isn't Kalani doing the spotlighting of the analysts?

Layla, Analyst — OpenExchange

Yeah, Dinesh is going to remove the spotlight. I think that's what he just said.

Damien, Other

Oh, sorry.

Layla, Analyst — OpenExchange

He was just talking through his specific steps.

Damien, Other

Oh, okay. And then, Dinesh, after the Q&A intro, you'll swap from this slide. After you swap the spotlight back to the Cattler team, you'll just want to change your background yet to that one. Yep. Perfect.

Operator

Sounds good.

Damien, Other

Perfect. I'm going to pull up the OE stream to test the holding slide and music there. Question I have is, is it possible for you to hide the Zoom names on the stream? Okay. Cool. And then I did add this slide deck as backup into the channel just in case.

Speaker 0

Thank you.

Ajay, Other

Just a quick check. All right, great. We can do a rehearsal quickly. You want to check audio? No, no, a rehearsal where we are switching the scene and somebody turns on the camera on.

Layla, Analyst — OpenExchange

Yeah, we can kind of simulate all those spotlights. I can come on camera.

Ajay, Other

So the complete. That will be great.

Layla, Analyst — OpenExchange

Ajay, were you just wanting to do the Q&A transition, or do we want to kind of do the whole thing?

Ajay, Other

The whole thing, so that we are all set.

Operator

Good morning, and welcome to Cadillac's Q3 2026 earnings presentation. Presenting today are Mikel Gleirup, Chief Executive Officer, and Peter Brogard, Chief Financial Officer. Please be reminded that presenters' remarks today will include forward-looking statements. Actual results may differ materially from those contemplated. The risks and uncertainties that could cause Cadillac's results to differ materially from today's forward-looking statements include those detailed in Cadillac's annual report on Form 20F, on file with the United States Securities and Exchange Commission. Any forward-looking statements made this morning are based on assumptions as of today, and Cadillac undertakes no obligation to update these statements as a result of new information or future events. This morning's presentation includes both IRFS and certain non-IRFS financial measures. A reconciliation of non-IRFS financial measures to the nearest IRFS equivalent is provided in Cadillac's annual report. The annual report and today's earnings presentation are available on Cadillac's website at cadillac.com forward slash investor. We ask that you please hold all questions until the completion of the formal remarks, at which time you'll be given instructions for the question and answer session. As a reminder, this call is being recorded today. If you have any objections, please disconnect at this time. Mikael Gleirup, you may begin.

Mikkel Gleerup, CEO

Okay, welcome to today's Catalir presentation of our Q3 2026 earnings call. Thank you all for joining. I think now, operator, we're ready to open it up for question and answer.

Operator

Thank you. At this time, we invite those analysts wishing to ask a question to click on the raised hand button, which can be found on the black bar at the bottom of your screen. You may remove yourself from the queue at any time by lowering your hand. When it is your turn, you will hear your name called and received a prompt to be promoted. Please accept, wait a moment, and once you have been promoted, you may unmute yourself and ask your question. We encourage you to turn on your video as well. We will wait one moment to allow the cue to form. Our first question today comes from Layla at OpenExchange. You may now unmute your audio and ask your question. Thank you.

Layla, Analyst — OpenExchange

All right, cool. Hi, everybody. This is Layla. Beautiful transitions. Wow. Um, Cattler team, I would like to know, uh... How's the weather where you are? I know what you're going to say, Joe.

Mikkel Gleerup, CEO

Yeah, I haven't been outside yet. It's a little early still, so it looks like it's going to rain, but I'm not sure, but I think it's pretty warm out, so that's nice.

Layla, Analyst — OpenExchange

All right.

Operator

Thanks for the time. Thank you. Our next question comes from Katie at OpenExchange. You may now unmute your line and ask your question. Thank you.

Katie, Analyst — OpenExchange

Hi, team. Thanks for taking my question. I'll just be audio only today, but great presentation, and I hope that everyone had a great weekend. Thanks for taking my question.

Mikkel Gleerup, CEO

Great. Thank you for your question. Really appreciate it. Thank you.

Operator

Due to time constraints, that's all we have time for today. Thank you for your participation. I will now hand the floor back to Mikel Gleirup for any closing remarks.

Mikkel Gleerup, CEO

Okay, thank you for joining our presentation today. Have a good rest of the week.

Damien, Other

Okay, a couple things on the stream. One, when we're reading the Q&A intro, you guys should be on the Q&A loop slide, like full screen, not have Cattler and the Q&A static slide in like the two view. And then for the stream, it looked... The analyst box was a little messy there. One, I saw the, like a spotlight view, not like a spotlight, like a film strip view on the first question. And on the second question, the cropping, Cattler's cut off of the slide where it says this is audio only.

Layla, Analyst — OpenExchange

Once we made those adjustments, we could go through some of those views again, just to confirm.

Damien, Other

Yeah, if it's just like the bridge icons, I'd rather them there with the Cadillor logo shown. Instead of cropping the Cadillac logo. Uh, Dinesh, can you go to the audio-only one?

Operator

Oh, sorry.

Damien, Other

No, you're okay.

Operator

All right. I was just going through the guidelines. One thing to double-check before I forget it. So, uh, so Daniel, our moderator, will be do the meet and greet, right? So she will be speaking to the speaker. Is that correct?

Damien, Other

No, you should. I'll also, I'll speak to them, but you, you should probably do that.

Operator

Okay, okay, okay.

Damien, Other

Sorry, I didn't realize that was still in there.

Operator

Okay, perfect. All right, so we are going to do, all right, here we go. So, I keep it off or on. Okay, okay, sure, sure.

Speaker 0

All right, yeah.

Damien, Other

And then I know on your side, the view is different with, like, with us spotlighting and unspotlighting people. So if you need to go full screen on the Cadillac team a little bit earlier, like, well, before, like, we do, like, the unspotlighting and re-spotlighting, that's totally fine to avoid that, like, film strip view. The slide looks much better. The audio-only slide looks much better. Thank you.

Ajay, Other

My previews are matching yours as well. Yep, whatever you prefer. Please keep the dimension on so that I have the same spacing on both the end and top and bottom. Thank you.

Mikkel Gleerup, CEO

Hey, just confirm, you guys still need my video on or?

Ajay, Other

Sure, I think we are good. You can turn off your camera.

Speaker 1

Thank you. Okay, thanks, Ajit.

Ajay, Other

Roxy, if you need, I can turn on my camera.

Layla, Analyst — OpenExchange

Thank you. I'm sorry, I just want to check because I was having some internet issues when I first joined, but did we get to test with Kehlani? Your audio was just sounding a little bit low.

Roxy, Other

Yeah, we can test again. How is it sounding now?

Layla, Analyst — OpenExchange

Yeah, it should be pretty good. I think it's just a little bit lower than Danny's. Do you have any clearance to turn it up a little bit higher in the Zoom settings?

Roxy, Other

No, we're at, well, actually, let me just double check this in again, but I'm at capacity with a

Operator

conference room in the waiting room, but, so, do you have anything to test before I let them in?

Layla, Analyst — OpenExchange

All good.

Operator

Okay, perfect.

Roxy, Other

I'll message you later.

Layla, Analyst — OpenExchange

Yep, sounds good.

Operator

There was a trap. Hello, gentlemen. Thank you for joining. My name is Dinesha. I'm the operator for this call. I hope you can see and hear me.

Ajay, Other

We can hear you, yes. Yes, if you think that is nice.

Operator

Alright, you look so unskilled, and I can see you on screen.

Ganesh, Other

There was a lot. It was unskilled. You could not slow so hard to do it. I actually thought, if you were going to break your money.

Peter Brogaard, CFO

Well, I saw that you did something like this. I had to look at that.

Ganesh, Other

Well, let me tell you something, because it was actually funny. Søren Mølgård, he still tried to slow hard on him. Thank you very much. Can I just tell you a little hemmelighed? I gave over the file and opened my terrace door in the old neighborhood with my fingers. I had on in it for 3 months. Is that the story? Morten Dahl told me that he had struck the ball in my fingers, so every time I could take my test from the open compartment, I gave it on in my hand for 3 months. You should be careful when you come up in the air. Ah, it's good, man, come to the end. Just saying, I'm still downloading.

Ajay, Other

Ganesh, are we in the right room for the presentation?

Ganesh, Other

Is the company name open next year?

Damien, Other

Hi, how are you? It's Damien here.

Ganesh, Other

Hi, Dana. I'm wondering whether that has had positive market development since. How are you? Are you good? How are you?

Damien, Other

Doing good. Ready for today.

Ganesh, Other

Yes, it's fantastic.

Ajay, Other

It's all good. Here we go. Can they see it? Yeah, they should be able to see it. They should be able to see all your screen. Okay.

Damien, Other

You guys can see your screen. Yeah. Yeah, we can see the desktop still. Yeah, exactly. If you want to make it full screen.

Mikkel Gleerup, CEO

And what can

Ajay, Other

you see in terms of us in the room?

Peter Brogaard, CFO

Yeah.

Ajay, Other

Do we need to adjust the angle of the...

Peter Brogaard, CFO

Can I get it, Joe?

Damien, Other

Reminds me if I'm wrong, but this one, we can't lower the camera, right? This one's kind of like the bird-eye view type shot.

Ajay, Other

No, we should be able to change the camera settings.

Damien, Other

Let's try to do that here. on the webcast with music at T minus 10 with a holding slide. At T minus five, we're going to mute the audio from your room out to the webinar so that we can let the analysts trickle in. So again, you won't be.

Operator

Good morning, and welcome to Cadillac's Q3 2026 earnings presentation. Presenting today are Mikel Gleirup, Chief Executive Officer, and Peter Brogard, Chief Financial Officer. Please be reminded that the presenter's remarks today will include forward-looking statements. Actual results may differ materially from those contemplated. The risks and uncertainties that could cause CADLA's results to differ materially from today's forward-looking statements include those detailed in CADLA's annual report on Form 20F, on file with the United States Securities and Exchange Commission. Any forward-looking statements made this morning are based on assumptions as of today, and CADLA undertakes no obligation to update these statements as a result of new information or future events. This morning's presentation includes both IRFS and certain non-IRFS financial measures. A reconciliation of non-IRFS financial measures to the nearest financial IRFS equivalent is provided in Cadela's annual report. The annual report and today's earnings presentation are available on Cadela's website at cadela.com forward slash investor. We ask that you please hold all questions until the completion of the formal remarks, at which time you will be given instructions for the question and answer session. As a reminder, the call is being recorded today. If you have any objections, please disconnect at this time. Make our glare up. You may begin.

Mikkel Gleerup, CEO

Thank you very much, and welcome to this Q3 presentation. Good morning, good afternoon, and good evening, depending on where you are in the world. Q3 highlights revenue up solidly with 65% versus the third quarter in 25%. And while we see that solid revenue build, we have also seen that the EBITDA reflects a higher project-specific cost and also transaction cost in connection with the acquisition of MENC. We still sit with a robust contract backlog of around 2.4 billion euro. Which we believe is part of what we have already talked about in the past, and something that creates solid earnings visibility, and also something that we do expect will continue to evolve as we move through the coming quarters. Positive news on the main integration, where we do continue to run according to plan, and I think that we can say that we are very pleased with where we are on that one, and also with the acquisition that is very much forming in the way that we expected. to build. Also, continuing with solid execution across the globe. And I think that what we can say here on the back of the third quarter is that we have definitely seen a very, very solid execution by everyone in the company. And during the first three quarters of the year, and Haunt C3 now has passed the halfway mark on Monopile installation, which is, of course, a very significant milestone for us in the company. And then also, I think it's very positive to say that we have seen the increased commercial momentum that we expected to really also be happening in the market. Having signed a substantial firm contract for 2728 for Wind Apex that are now scheduled to deliver either at the end of April or the beginning of May, but also an exclusivity agreement for both foundation and BTG installation at a large offshore wind farm in the UK from 2030. It's very positive signs of this commercial momentum that we also continue to see with what we are working on at the moment. In terms of commercial highlights in Q3, vessels working across the globe, CELA continuing to work in the U.S., a lot of vessels working in Europe, and MAGA are also working in Asia. I think notably here, reflecting on the Wind Ace that we delivered ahead of schedule, we have been mobilizing her ahead of schedule, and we actually expect that she will be ready for foundation installation ahead of schedule in Europe. And that provides an opportunity for the company to already start to use her as soon as she is ready with the full mobilization. She is currently in transit to Europe and almost here. And we will do the final project mobilization when she arrives and then start working with her as early as possible. During Q3, we have also seen some technical downtime. One of the downtimes that we have seen was an incident in the Port of Tyne that led to Windorca being out of operations for a period of time. We are pleased to say that Windorca is now working very efficiently again on the project, and also that we expect that Windorca will recover the lost time before the end of the project. And we are addressing the root cause of this incident with fleet-wide measures, really to learn from this and ensure that everybody in the fleet and all members of the team in Cattler learn from this incident. On Windmaker, we have been challenged by an industry-wide issue where we do see rapid wire degradation across these new crane types. And that has caused an unplanned technical downtime on windmaker and also additional costs. I'm also pleased to say that we are working in close collaboration with our suppliers, and also we are creating solutions with the OEM, and we'll gradually start to implement that on the vessels to get the wire degradation to a point that is acceptable for us as a company. So a lot of effort on the operational side is spent on making sure that we get to a point that we are happy with there. And then, of course, in the meantime, ensuring that our spare parts are available where the vessels are working so we can get back to work quickly if we see rapid wire deterioration on one of our vessels. In terms of Hauntier 3, We started off the project and started safe, and then we went from first to fast, and now we are at full speed ahead. We have passed the halfway mark on the monopiles, and the wind turbine installation has also started with two vessels, one from one of our peers, and the wind pace also having loaded its first six turbines, and is currently in its first installation cycle on the project. I think that what we can say on Hornsea 3 is that we continue to find the optimizations between the vessels working on the project, and also that we do see that the net roundtrip durations are continuing to reduce, and the learnings that we have from Hornsea is something that we, of course, will implement across the company for future monopile installation projects on our jack-up fleet. It is a big milestone for us that we have passed the halfway mark, and that is something that we are pleased with, and we continue to support our clients to ensure that we are... Completing the project on time and on budget, so we can also have a successful project ending on this one. In terms of project monopile logistics, we are progressing as well. We have three heavy transport vessels on charter, and we have more than 150 monopiles that have been loaded into the marshalling port, which is also, I think, a big success for us because that is, of course, a big thing to handle, And handling the logistics in the marshalling port, ensuring that we can offload the barges, as you see on the picture here, get them stored, and then load it out on Wind Ally as she picks them up again for final installation on the site. That is a big logistical exercise, and I'm pleased to see that that has also been handled according to the plan, and that we are now starting to transport the final monopiles, the last quarter of the monopiles, into the project as well. In terms of the backlog, continuing a significant backlog, as I said, Euro 2.4 billion, which creates a lot of visibility for us, but still with a lot of things to come, we have in the previous quarter shown these vessel reservation agreements and the preferred supplier agreements that we have not included in the backlog. But we do believe that we are starting to see conversion to contracts as we move through these important milestones that the industry is standing in front of in the coming month. So we feel that we are in a good place at the moment. And we see the momentum building on the discussions with clients and also confident that we will see that converting from reservation and preferred supply agreements into contracts that will add to the backlog as we go forward. As we have shown here in the past, The backlog and also what portion of the backlog that has already seen final investment decision. And that is, of course, a number that we monitor and we are confident with where we are at the moment and believe that the backlog is a very high quality backlog and with more coming, probably what is being added to the backlog will have shorter duration from being added to the backlog to FID due to the nature of what we have seen on the latest auction awards and the auctions to come. We have seen a firm contract on the Dogger Bank project where we are very pleased to support our partners from Equinor and SSE, and that is something that we will be commencing in Q3 27, and that will be running into 28, where the client can use the desolate both on Dogger Bank C, but also on A and B if they wish to do so. And that is something that we are very happy with, that award, because we are really able to service two of our partners in the industry. And then, as we have already discussed, a lot more to come and also very pleased to see that Nexra has started working on a long term agreement on O&M, something that we also believe we will see more from Nexra in the future. In terms of the new build progress, at the moment, we are only reporting on the Wind Apex because that's the only one that's in construction. We expect delivery in Q227, and we are at the moment on 87% completion rate. We have actually completed the installation of the crane, so the crane boom has also been installed, the crane house has been installed, the A-frame has been installed, and we have also had the first fire up of an engine on the vessel. So we are on track at the moment, and I think that that is incredibly positive that we, even on this very, very ambitious and accelerated timeline for the delivery, are on track, that is a positive message. And here at the financial highlights, I will hand it over to Peter for the financials.

Peter Brogaard, CFO

Yeah, thank you, Miki. This is the highlights, a revenue of 255.1 million as compared to 154.3 in the same quarter last year. Equity ratio 41%, of course. A little bit lower due to the main composition than last year. Utilization at a very high level, 90.9%, adjusted for planned dry docking and transportation from yard, as compared to fully for Q3.25, it was a little bit higher, 92.2%, but still at a high level. Market capitalization, 2.2 billion. Adjusted EBITDA, 120.4 million. And that is adjusting for main transaction costs. We have incurred 7 million euro of transaction costs that we have expensed in Q3 related to the main acquisition in the 11th of August. And that is comparable to 109.1 million in 25. Net profit of 55 million as compared to 64.6 million last year. And that is, of course, impacted by the transaction cost on the mint, but also it is increased depreciation, and it is financing costs now flowing through the P&L, whereas last year more were capitalized as CAPEX on the new building program. Backlog, as I explained, by the middle, 2.4 billion euros, still at a reasonable level, and same level as last year. Three months' daily average turnover is €7.5 million, and that is now also measuring the trading coming out of the direct listing that we have now, of course, the Project Alban, where we re-domecise to the UK the 4th of November. This is the P&L for the three months, ending September 26th. Revenue is up as compared to last year, during the higher contract dates following the fleet expansion, and there's also coming 24 million euros from MENC since the acquisition on 11 of August. And MENC has been consolidated in line by line, full consolidation, since it, of course, also impacted the other lines in the property and laws. Fleet utilization was 78% as compared to 92%, still reflecting this transport period and Saratan undergoing operate work. So adjusted utilization in line with last year. The cost of sale increased by €99 million to €157 million. Doing by operating costs, including the issues that Mikkel mentioned on the ORCA and the MELCA, where we had a certain project cost or additional OPEX on these two vessels in these three months. And then... There's also some costs from days and transport and installation scopes, and then there is 14 million euro from MENC. As you may, it increased by 21 million to 37 million. That is including the 7 million we had in the MENC acquisition cost. And then also the continued scaling of onshore functions. That we have seen in the past years. EBITDA increased by €4 million to €113 million. If we adjust for the mint transition cost, it's €120 million as compared to €109 million last year. We're still open per day, 37,000 as compared to 38,000, so under control. So if you look at the P&L and commenting on the margins, they are changing due to different reasons. First of all, we are now doing a foundation project on 23 with also a transport and installations group as compared to 25 where it was purely crew. And the vessel that was invoice now, we also have the transportation installation, the transport installation scope with a little bit of a lower margin. And also including MENG, where we previously have said that EBITDA margin on the MENG is around 33%. Um, and, um, And also these special items or non-recording items that we have seen on Orca and Maker. For the nine months, we still have this, as we also explained about half-year accounts that last year included a termination fee of 111 million, so it's not directly comparable to last year. But the same picture as we saw for the Q3, revenue is increasing due to the bigger fleet and more contracted days. Cost of sales increased by 245 million to 404, again driven by operating costs under 23, and vessels depreciation from fleet expansion, project-specific costs on the foundation, transport and installation scopes, and Euro 14 million from MENC. So, 24 million in revenue from MENG and 14 million of cost from MENG. So, that gives a net EBIT of 10 million euro for MENG in this period over September, including MENG. Again, the SG&A and oil expenses increased by 30 million euros too. Euro 77 million, where we have included the 7.2 million Euro of MENC transaction cost, and again, the increase or the scaling of the onshore functions and inclusion of MENC. Adjustability beta is 7 million and higher than last year, but please remember that last year also included 110 million euro of troponation fees, so a solid improvement from last year. So, I don't cheat. 41% of equity ratio total assets increased by 1 billion euro to 4.5 million euro since 25 year-end. It's a 31% increase. Of which the MIG acquisition accounts for approximately nine percentage points, and that is, you know, the PPA, where they go through when you do an acquisition and includes intangible assets, including a goodwill of 163 million PPA increased by four. $484 billion, reflecting the new bills being delivered or installments made, and the vessel upgrades that we have seen. Equity increased to €1.9 million, an increase of $347 million from year-end. That is, of course, ruined by the proceeds from the share capital increase that we did late March 26. Euro 143 million from the profit, and with the bigger balance sheet, but also the bigger equity, we are now at an equity ratio of 41%. If we look at the near-term use of funds, it's a slide that we show at the corner to demonstrate that we have liquidity to go through. Our CAPEX program, we had cash end of Q3 of 140. We have an undrawn RCF at 100 million. Then we did, we have a bridge loan for the squeeze out in connection with the VWization to the UK. We know that we had to squeeze out approximately 8% of the shares. And that amounts to 173 million, but we have a bridge loan from the banks to do that. New bills, we have an A-class financing of 208 million committed, whereas CAPEX is 263. That gives us a net liquidity of 257 million euro. Then we are working on a new take-out facility refinancing. It looks like a small number. It's 5 million, but it is to take out the bridge loan to acquire the link, where we had a bridge loan of 380 million, and that will be consolidated together with the... The Euro 550 million facility on the legacy assets and then the winkeeper, and that leaves us with 262 million off net liquidity post refinancing. This is a financing overview. As you can see here, the trade-out facility that we are working on, our plant, with the banks, is to take out the O-Class, Silla and Saraton financing together with the Wind Keeper and then make rich loan into one facility. We see interest. Solid interest from the banks to do that, and we are in advance progress of doing so. Full year outlook. We maintain the outlook for 26, which is a revenue of 663 million euro and an adjusted EBITDA of... So, 910 million euros to 1 billion, sorry, revenue, and then adjusted EBITDA in the range from 435 to 525 million euros, so exactly the same as we announced at Huffian.

Mikkel Gleerup, CEO

Yes, and on the commercial outlook, just briefly, we, as I already said in the previous part of the presentation, we do see the momentum in offshore wind continue to build, and also I think that that is converting for us into an increasing visibility into demand. We believe that offshore wind will be an essential part of the solution for the global need for electricity, which is on the rise. We do believe that the ongoing geopolitical tensions and volatility that we have seen is also something that will increase the need for locally produced energy, energy security and affordability in certain regions in the world, in particular in Europe. And also the demand increase we expected for the next decade is something we also start to see building and materializing, which makes us confident in the strategic decisions that we have made. There is a lot of auctions that are now coming in the coming months, as I also alluded to it in the previous part of the presentation. Most notably is, of course, the UK Auction Round 8, the Auction Round in France, and also in South Korea. A market that we see continuing to build momentum in Asia, and Asia is an interesting region because it is really going from one addressable market to three, and maybe up to five or six addressable markets, and something that, of course, makes us focus on that market as we continue building in the region. So we do expect that there will be awards coming for the Asian market, and I think that the market is continuing to build according to plan, which is positive, of course. The global capacity awarded year-to-date standard 16 gigawatts, which is, of course, above what we saw in 25, and I think that the doldrum that we have seen somehow in the second half of 25 and first half of 26 is starting to disappear, and I think that we do expect the award volumes to go up significantly here in the end of 26, but also into 27 as these major Auction rounds, especially in Europe, conclude. If we look at the fleet overview, in the global fleet, not having, let's say, anything discounted, I think it's fair to say that we still stand on the left side here as the clear leader in terms of fleet, and that we are very pleased with where we stand at the moment with the flexibility, the redundancy, and the way we can support our partners when something doesn't go to plan or where we need to speed up and whatever. And I think that that will be very, very essential in the coming years that we are swift, we are fast, and we are prepared to serve any kind of shift or change in the industry, and use the fleet to try to keep projects as much as possible on timeline and help our partners by doing so. And that is discussion that we already have with our partners. And I think that that is also something that they appreciate in how we operate the fleet. Then I think, as we have also talked about in the past, Kattler is starting to integrate technology more and more. And for us, it's about really gaining more efficiency in how we are able to serve the clients out there on projects. We sit on the largest fleet in the industry, and hence, we are also collecting the largest data set in the industry. On top of that, we have also inherited a lot of data points on file driving with our acquisition of Mink. And I think that that is data that we are able to use to benefit both us and our partners for more efficient offshore wind installation. And that is something that is going hand in hand with using the latest AI technology to have a quicker decision support and decision making, especially in complex soil conditions where we will be able to bring down timing, In particular for O&M projects, for example, down to something that looks like a fraction of where we were in the past, but also having this data available in real time, supporting our offshore crews, supporting our clients and supporting our onshore team to make fast decisions as we execute on projects, but also overall to ensure that we capture this data from campaign to campaign, from project to project, from vessel to vessel and really make sure that we learn from everything we capture on a project and bring that into the next one. So we can continue to see this improvement. And that is one of the things that we are focusing on, for example, with the engagement of WindAce now, that the latest learnings we have on WindAce, that that is already brought on to WindAce. So we start at a much, much more efficient pace on WindAce and not having to experience all the same learnings, again, So really trying to cut the learning curve across the fleet and using technology as a much more visible element in how we do project execution. And we will continue to inform the capital markets about this as we go ahead. And there will be news in the not so distant future on how we can see actual integration of AI into how we do projects and also how that will make efficiency enhancements for the company and for our partners. In terms of key investment highlights, as we always end on here, but really largest and most capable and most versatile fleet, and really the right equipment, which creates redundancy for the clients. Strong relationships and partnerships across the industry and really trying to use what we have to make our clients and partners stronger in a very strong partnership as we move through the projects and add new ones as well. Global reach, we can work anywhere, we can work with anyone. And I think that now also with the companies installed the most foundations in the industry, with the data and the knowledge we have gained from the MENG acquisitions puts us in a leading position for foundation projects in the industry. We believe that there is a structural under supply and an increasing market demand for the services that we provide, and we will continue to be diligent in the projects we go for and really focused on adding to the backlog and reporting that back to the capital markets on a quarter-by-quarter basis. As we already discussed here at the end, 50 million data points, turning that into something that the industry and that we can benefit from is very, very important for us. And hence, we will report more on that as we go through the next quarters as well. And with that said, I think we will open up on the Q&A.

Operator

Thank you. At this time, we invite those analysts wishing to ask a question to click on the raised hand button, which can be found on the black bar at the bottom of your screen. You may remove yourself from the queue at any time by lowering your hand. When it is your turn, you will hear your name called and receive a prompt to be promoted. Please accept. Wait a moment, and once you have been promoted, you may unmute yourself and ask your question. We encourage you to turn on your video as well. We will wait one moment to allow the cue to form. Our first question today comes from Jamie Franklin at Jefferies. Jamie, you may now unmute your audio and ask your question. Thank you.

Jamie Franklin, Analyst — Jefferies

Hey there, guys. Thank you for taking my questions. So firstly, just thinking about the vessel utilization in 4Q. Typically, we see a bit of a decline in utilization in 4Q due to seasonality. I'm just wondering, given the lower 3Q kind of base, 78% utilization with maker and orca impact, could 4Q end up being a bit better than 3Q? Are there any vessels we should assume downtime on throughout the fourth quarter? Thank you.

Mikkel Gleerup, CEO

Yeah, I think that very good question, Jamie. Thanks for that. I think that on the vessels where we, so ORCAT was already projected to work through the year and the downtime that we had on ORCAT and 3Q cannot be caught up, let's say with more than 100% utilization in Q4. So that will be a year with slightly lower utilization. And as I said already, we expect to catch up on ORCAT before the end of the project next year. But that is an effect that we unfortunately cannot catch up because she was already predicted to work throughout the year. On Windmaker, we are catching up in Q4 because she had a slightly different rotation originally. One can always speculate whether we were able to have filled that gap with some other work which we might have. But according to the plan, there is a bit of a catch-up effect. We have decided that That wind peak, we will do some of this maintenance that we discussed that was needed on the wire situation. The different crane types have different things that we need to fix, but there is a fix which is positive, and we are looking to do as much as we can on wind peak, and hence we don't expect that wind peak will work more this year, but then start working again in Q1 next year instead. And that is a decision we have made on when it's best to do what we need to do with Winpeak and Saratan is in transit to Europe at the moment, so she will also not be working.

Jamie Franklin, Analyst — Jefferies

Okay, thank you. And then obviously, it's good to see that the guidance is reiterated, but it is quite a wide range and there are a lot of moving parts. And one of the points that you mentioned is the anticipated hammer sale in December. Just wondering if you can give us a sense of the magnitude on that. Is that essentially sort of the bulk of the contribution of EBITDA that you expect from Menk this year in that one's hammer sale?

Mikkel Gleerup, CEO

We can say that that Hammersale follows the plan, and we expect it to be happening in December, but in terms of the size, we cannot disclose that for obvious commercial reasons.

Jamie Franklin, Analyst — Jefferies

Okay, fair enough. And then finally, just on this wire rope degradation issue then, so you're working on a more permanent fix for Maker in the first quarter. I think that is when the vessel is not contracted anyway, but just wondering the sort of length of downtime there and whether this is something that's going to need to be done for all of the fleet or just select vessels.

Mikkel Gleerup, CEO

Yeah, so I think that the maker, mover, and keeper, and for that matter, other vessels with that type of crane will have to do the same, likely, and we expect that we will do that in the first quarter next year on windmaker. We, of course, continue to monitor. The good thing is that we have spare parts available now, meaning that the effect, if we should run into wire degradation, should be less than what we have seen this year. The unfortunate situation was that we had to ship a wire from Europe to Asia, because the degradation was faster than what we expected. And the new wire we had for Asia hadn't been produced yet. It's coming here. I expected mid-December now from a manufacturing facility In Malaysia, on the P and the A class, the situation is different and less urgent because there we have an opportunity to prop the wire, but that is also something we have seen our peers in the industry have suffered from the same issue, and that is something where we need to find a solution for as well, and when that solution is there, then we will do it. But but I think it's fair to say that on these vessels, there are more options to do things that will not impact timelines as much. And also, if we need to replace the wire, we have spare parts available. So the magnitude should be less. And then when we when we when we have, you know, time for it, then we will do it. But we will try to, of course, fit it in when it's convenient, rather than just in the middle of everything else.

Jamie Franklin, Analyst — Jefferies

Okay, very clear. Thanks for that. I will hand it over. Thank you again.

Operator

Thank you. As a reminder, if you would like to ask a question, please click on the raised hand button, which can be found on the black bar at the bottom of your screen. We'll allow a moment. And our next question comes from Audrey Zhang at China Securities. Audrey, you may now ask your question. Thank you.

Audrey Zhang, Analyst — China Securities

Thank you. Hi. Good afternoon. This is Audrey Zong from China Securities, and thank you for taking my question. My first question is about your growth margin. Your Q3 growth margin declined from around 62% last year to 38%. Actually, you mentioned the two vessels' technical downtime. And could you please explain what this cost relates to? And also, how has the revenue mix changed across turbine installation, foundation installation, and O&M? And roughly, what gross margin do you see in each business segment? Thank you.

Mikkel Gleerup, CEO

You I can start with the end of the question. We don't guide on, let's say, the specific margins, because that is difficult for us to do. So we are not giving a number per segment. But what we have said is that the foundation business, for example, is generating a lower margin number in percentage terms, but in absolute numbers, it's better. And I think that that is where we are seeing a shift. Last year, we did not execute a foundation project. We are doing that this year. And that is partly the reason that we see the margin in terms of percentage dropping down. But I think in overall numbers terms, we are still very confident with the foundation's business as we move ahead.

Audrey Zhang, Analyst — China Securities

Okay, so, um, um, Okay, so my next question is about acquiring mink. I want to know, have you seen any tangible operational improvements in your foundation, transportation, and installation projects? Where have this improvement been most evident? If the synergies have not yet been apparent, when would you expect them to start materializing? And also, Mikko, you just mentioned a very good point, is your data set and your AI technology to apply for your projects. So really appreciate that and want to know how Mink can contribute to your business. Thank you.

Mikkel Gleerup, CEO

Yeah, it's too early because we are not harvesting any synergies yet from the MENC acquisition because the project where we are installing foundations at the moment, we don't have hammer in scope. That is the client that have the hammer in scope, but it is a MENC hammer. So if that is a synergy, that's the only synergy. But of course, we expect that it will be driving synergies in the future, because we will be able to offer to the client a package solution rather than a split solution where you have to contract both for the hammer and the vessel, where in the future, as we have already discussed with the capital markets, we expect to offer this in a one package solution that if you have a hammer, you also can have a vessel and vice versa. And that is important for us. While also, of course, still being more than able and willing to provide this service to our peers as well, which I'm also very positive to say that we have now gone through some months having the ownership of the main business. And we discussed when we announced the acquisition that it was for our clear target to run MENC at an arm's length principle to allow us to still work with our peers in the industry. And I'm pleased to say that that is also how it's looking to come about now. We have, or rather the team in MENC have had very, let's say, detailed discussions with the clients. And I think that we are finding good solutions for how we can continue to work together, which is the aim for us. So I'm very pleased to see the work that has been done by the team and also that we are steering towards forming maybe even tighter relationships with clients going forward. So they also are sure that they have a steady supply of the service that Meng supplies. So that is something I send really big kudos to the team at Meng for having been able to go through these months and explain to their clients how this will move forward. And we will be continuing to. To inform about how does this arm's length principle work, because we do not want, let's say, to know anything about what our peers are doing with MENG and all of that. We want MENG to be a solid industry company that can ensure that there's enough equipment available to install the piles that we need to install in the future. We have also an interest in that because we also have a large fleet of turbine installation vessels. So we all have an interest in that, and hence we will continue to operate like that. In terms of the data, Mink, of course, has a lot of knowledge about soil conditions and pile driving. And we have a lot of knowledge about jagging conditions and soil as well. And I think combining this knowledge will create a very, very strong data set. That we can use to create a lot of efficiency in the industry. And I think that just from having heard from the various geotech teams on what can be achieved with this kind of data and the application of AI across that, and other things as well, is something that I think is delivering an efficiency that the industry hasn't seen before, and also something that will make us all better. Which I'm positive about. And as I said, we will continue to inform about that as we move through the next steps and on that journey.

Audrey Zhang, Analyst — China Securities

Okay, great. Great. That's very helpful and very clear. Thank you, Mikko.

Mikkel Gleerup, CEO

Thank you, Odin.

Operator

Thank you. Our next question comes from Anders Rosenlund at CED. You may now unmute and ask your question. Thank you.

Anders Rosenlund, Analyst — CED

Thank you. A couple of questions. On currency, is that on budget and on schedule?

Mikkel Gleerup, CEO

Yes, the project is continuing on schedule. As we already informed, the schedule changed basically early in the project due to many different reasons, also reasons that are outside the control of Kaplan. But I think that we are, I think it's fair to say that we are working on the schedule, that everybody agrees is the schedule now, and so very pleased with that. And yes, we are, we have spent more money on transportation, for example, because we are now having three transportation vessels, but that is also something we have already discussed, and that is why that there is a risk contingency in a project like this that we have, of course, decided to use for the benefit of everything. Not all of it, but some of it to speed up the transportation, but very much where we want to be on this project, yes.

Anders Rosenlund, Analyst — CED

Excellent. And on MENC, will you introduce segment reporting and report MENC as a separate segment at any point in time?

Peter Brogaard, CFO

Yes, we will at the end of the report in March.

Anders Rosenlund, Analyst — CED

But not on a quarterly basis? No. Or will you do it on a quarterly basis as well going forward?

Peter Brogaard, CFO

We are not planning to do it on a quarterly basis, but we will do it in the annual report.

Anders Rosenlund, Analyst — CED

Okay, thank you. And my final...

Peter Brogaard, CFO

So, we might introduce it in the quarterly reporting, but we will not guide, you know, specifically in the historical reporting. We might do it in 27.

Anders Rosenlund, Analyst — CED

Okay, excellent. And my final comment is not really a question, it's just a comment, and that is that it would be good if you break down the auto backlog by year of execution. But I think I've asked that question so many times before that I won't ask it as a question this time. Okay. Notice.

Operator

Thank you. We have no further questions at this time. Thank you for your participation. I'll now hand the floor back to Michael Gleirup for any closing remarks.

Mikkel Gleerup, CEO

Thank you very much, and thank you for everybody listening in. Looking forward to report next time as well, but be in touch if there's any follow-up questions. We are, as a rule of thumb, always available if there's anything. Thank you very much for listening in, and have a good day.