Gold Fields Ltd 6-K, filed Mar 31, 2022
Gold Fields Ltd (GFI)
6-K
2022-03-31
For: 2021-12-31
View Original
Added on
July 08, 2026
About this 6-K
Gold Fields Ltd filed this 6-K on March 31, 2022.
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934
Dated 31 March 2022
Commission File Number 001-31318
Gold Fields Limited
(Translation of registrant’s name into English)
150 Helen Rd.
Sandown, Sandton 2196
South Africa
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F:
☒ Form 20-F | ☐ Form 40-F | ||||
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): ☐
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): ☐
Explanatory Note
This Form 6-K includes the exhibits containing the Technical Report Summaries for the material mining properties of Gold Fields Limited (“Gold Fields”) in Australia pursuant to Subpart 1300 of Regulation S-K under the Securities Act of 1933. Each of the exhibits is filed herewith in order to be incorporated by reference into Gold Fields’ annual report on Form 20-F for the year ended 31 December 2021.
| Exhibit No. | Description | |||||||
| 96.4 | ||||||||
| 96.5 | ||||||||
| 96.6 | ||||||||
| 96.7 | ||||||||
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorised.
| Gold Fields Limited | |||||||||||
| Date: 31 March 2022 | By: | /s/ Chris Griffith | |||||||||
| Name: | Chris Griffith | ||||||||||
| Title: | Chief Executive Officer | ||||||||||
Exhibit 96.4 P a g e 1 | 137 Goldfields.com Technical Report Summary of Mineral reserves and Mineral resources 31 December 2021 for Gold Fields Limited – St Ives Gold Mine – Australia
P a g e 2 | 137 Table of Contents 1 Executive summary .............................................................................................................................................................. 8 1.1 Property description and ownership ............................................................................................................................ 8 1.2 Geology and mineralisation ........................................................................................................................................ 9 1.3 Exploration, development and operations ................................................................................................................. 10 1.4 Mineral resource estimates ........................................................................................................................................ 10 1.5 Mineral reserve estimates .......................................................................................................................................... 12 1.6 Capital and operating cost estimates ......................................................................................................................... 13 1.6.1 Capital ............................................................................................................................................................... 13 1.6.2 Operating costs .................................................................................................................................................. 13 1.7 Permitting .................................................................................................................................................................. 13 1.8 Conclusions and recommendations ........................................................................................................................... 14 2 Introduction......................................................................................................................................................................... 15 2.1 Registrant for whom the technical report summary was prepared............................................................................. 15 2.2 Terms of reference and purpose of the technical report summary ............................................................................. 15 2.3 Sources of Information .............................................................................................................................................. 15 2.4 Qualified persons and details of inspection ............................................................................................................... 15 2.5 Report version update ............................................................................................................................................... 16 3 Property description ........................................................................................................................................................... 17 3.1 Property location ....................................................................................................................................................... 17 3.2 Ownership and area ................................................................................................................................................... 18 3.3 Property mineral titles, claims, mineral rights, leases and options ............................................................................ 18 3.4 Mineral rights description ......................................................................................................................................... 25 3.5 Encumbrances ........................................................................................................................................................... 27 3.6 Other significant factors and risks ............................................................................................................................. 27 3.7 Royalties or similar interest....................................................................................................................................... 28 4 Accessibility, climate, local resources, infrastructure and physiography .................................................................... 29 4.1 Topography, elevation, and vegetation ..................................................................................................................... 29 4.2 Access ....................................................................................................................................................................... 29 4.3 Climate ...................................................................................................................................................................... 29 4.4 Infrastructure ............................................................................................................................................................. 29 4.5 Book Value ............................................................................................................................................................... 30 5 History .................................................................................................................................................................................. 31 6 Geological setting, mineralisation, and deposit ............................................................................................................... 32 6.1 Geological setting ..................................................................................................................................................... 32 6.2 Mineralisation ........................................................................................................................................................... 35 6.2.1 Invincible .......................................................................................................................................................... 35 6.2.2 Neptune ............................................................................................................................................................. 36 6.2.3 Hamlet North..................................................................................................................................................... 38 7 Exploration .......................................................................................................................................................................... 39 7.1 Exploration ................................................................................................................................................................ 39 7.2 Drilling ...................................................................................................................................................................... 41 7.2.1 Type and extent ................................................................................................................................................. 41 7.2.2 Procedures ......................................................................................................................................................... 42 7.2.3 Results ............................................................................................................................................................... 43 7.3 Hydrogeology ........................................................................................................................................................... 46 7.4 Geotechnical ............................................................................................................................................................. 47 7.5 Density ...................................................................................................................................................................... 48 8 Sample preparation, analyses, and security .................................................................................................................... 49
P a g e 3 | 137 8.1 Sample preparation ................................................................................................................................................... 49 8.2 Sample analysis ......................................................................................................................................................... 50 8.3 Quality control and quality assurance (QA/QC) ....................................................................................................... 51 9 Data verification ................................................................................................................................................................. 53 9.1 Data management ...................................................................................................................................................... 53 9.2 Plant Sampling .......................................................................................................................................................... 54 9.3 Drilling and sampling ................................................................................................................................................ 54 9.4 Survey ....................................................................................................................................................................... 54 9.5 Sample analysis ......................................................................................................................................................... 55 9.6 Geological modelling ................................................................................................................................................ 55 10 Mineral processing and metallurgical testing ................................................................................................................. 57 10.1 Testing and procedures ............................................................................................................................................. 57 10.1.1 Background ....................................................................................................................................................... 57 10.1.2 Metallurgical sampling & testing ...................................................................................................................... 57 10.2 Relevant results ......................................................................................................................................................... 58 10.2.1 Sample head analyses ........................................................................................................................................ 58 10.2.2 Metallurgical recovery ...................................................................................................................................... 62 10.2.3 Ore hardness ...................................................................................................................................................... 63 10.3 Plant Sampling .......................................................................................................................................................... 64 10.4 Deleterious Elements ................................................................................................................................................ 65 10.5 Metallurgical Risks ................................................................................................................................................... 66 10.5.1 Sample Representativity .................................................................................................................................... 66 10.5.2 Laboratory Test Methods and Scale-up ............................................................................................................. 66 10.5.3 Deleterious Elements ........................................................................................................................................ 67 11 Mineral resource estimates ................................................................................................................................................ 68 11.1 Mineral resources estimation criteria ........................................................................................................................ 68 11.1.1 Geological model and interpretation ................................................................................................................. 68 11.1.2 Block modelling ................................................................................................................................................ 69 11.1.1 Compositing and domaining ............................................................................................................................. 69 11.1.2 Top cuts ............................................................................................................................................................. 69 11.1.3 Variography ...................................................................................................................................................... 69 11.1.4 Grade estimation ............................................................................................................................................... 70 11.1.5 Selective mining units ....................................................................................................................................... 71 11.1.6 Model validation ............................................................................................................................................... 71 11.1.7 Cutoff grades ..................................................................................................................................................... 72 11.1.8 Reasonable prospects of economic extraction ................................................................................................... 75 11.1.9 Classification criteria ........................................................................................................................................ 75 11.2 Mineral resources as of 31 December 2021 .............................................................................................................. 76 11.3 Audits and reviews .................................................................................................................................................... 78 11.4 Comparison with 31 December 2020 against 31 December 2021 Mineral resource ................................................. 78 12 Mineral reserve estimates .................................................................................................................................................. 79 12.1 Level of assessment .................................................................................................................................................. 79 12.2 Mineral reserve estimation criteria ............................................................................................................................ 81 12.2.1 Recent mine performance .................................................................................................................................. 81 12.2.2 Key assumptions and parameters ...................................................................................................................... 82 12.2.3 Cutoff grades ..................................................................................................................................................... 84 12.2.4 Mine design and planning ................................................................................................................................. 84 12.2.5 Mining schedule ................................................................................................................................................ 85 12.2.6 Processing schedule .......................................................................................................................................... 88 12.2.7 Classification criteria ........................................................................................................................................ 88 12.2.8 Economic assessment ........................................................................................................................................ 89 12.3 Mineral reserves as of 31 December 2021 ................................................................................................................ 89
P a g e 4 | 137 12.4 Audits and reviews .................................................................................................................................................... 90 12.5 Comparison with 31 December 2020 to 31 December 2021 Mineral reserve ........................................................... 91 13 Mining methods .................................................................................................................................................................. 92 13.1 Geotechnical models ................................................................................................................................................. 92 13.2 Hydrogeological models ........................................................................................................................................... 94 13.3 Mining methods ........................................................................................................................................................ 94 13.4 Equipment and labour requirements .......................................................................................................................... 96 13.5 Final mine outline ..................................................................................................................................................... 97 14 Processing and recovery methods ..................................................................................................................................... 99 14.1 Flow sheet and design ............................................................................................................................................... 99 14.2 Recent process plant performance ........................................................................................................................... 100 14.3 Process plant requirements ...................................................................................................................................... 100 14.4 Processing Risks ..................................................................................................................................................... 101 14.4.1 Major Equipment Failure ................................................................................................................................ 101 14.4.2 Plant Operational Management ....................................................................................................................... 102 14.4.3 Operating Costs, Plant Consumables and Reagents ........................................................................................ 102 15 Infrastructure .................................................................................................................................................................... 103 15.1 Tailings storage facilities (TSF) .............................................................................................................................. 103 15.2 Waste rock dumps ................................................................................................................................................... 105 15.3 Water ....................................................................................................................................................................... 106 15.4 Power ...................................................................................................................................................................... 107 15.5 Accommodation ...................................................................................................................................................... 107 15.6 Site access ............................................................................................................................................................... 107 15.7 Other infrastructure ................................................................................................................................................. 107 16 Market studies ................................................................................................................................................................... 108 16.1 Preliminary market study ........................................................................................................................................ 108 16.2 Metal Price history .................................................................................................................................................. 110 17 Environmental studies, permitting, and plans, negotiations, or agreements with local individuals or groups .... 111 17.2 Environmental studies ............................................................................................................................................. 114 17.3 Waste disposal, monitoring and water management ............................................................................................... 114 17.3.1 Tailings storage facilities (TSF) ...................................................................................................................... 114 17.3.2 Waste rock dumps ........................................................................................................................................... 115 17.3.3 Water management.......................................................................................................................................... 115 17.4 Social and community ............................................................................................................................................. 116 17.4.1 Social and community ..................................................................................................................................... 116 17.4.2 Native Title and Heritage ................................................................................................................................ 117 17.5 Mine closure............................................................................................................................................................ 118 18 Capital and operating costs ............................................................................................................................................. 119 18.1 Capital costs ............................................................................................................................................................ 119 18.2 Operating costs ........................................................................................................................................................ 119 19 Economic analysis ............................................................................................................................................................. 121 19.1 Key inputs and assumptions .................................................................................................................................... 121 19.2 Economic analysis ................................................................................................................................................... 122 19.3 Sensitivity analysis .................................................................................................................................................. 122 20 Adjacent properties .......................................................................................................................................................... 123 21 Other relevant data and information ............................................................................................................................. 124 22 Interpretation and conclusions ....................................................................................................................................... 126 22.1 Risks ....................................................................................................................................................................... 127 23 Recommendations ............................................................................................................................................................ 129
P a g e 5 | 137 24 References .......................................................................................................................................................................... 130 25 Reliance on information provided by the Registrant ................................................................................................... 131 26 Definitions .......................................................................................................................................................................... 132 26.1 Adequate geological evidence ................................................................................................................................. 132 26.2 Conclusive geological evidence .............................................................................................................................. 132 26.3 Cutoff grade ............................................................................................................................................................ 132 26.4 Development stage issuer ........................................................................................................................................ 132 26.5 Development stage property.................................................................................................................................... 132 26.6 Economically viable ................................................................................................................................................ 132 26.7 Exploration results .................................................................................................................................................. 132 26.8 Exploration stage issuer .......................................................................................................................................... 132 26.9 Exploration stage property ...................................................................................................................................... 132 26.10 Exploration target .................................................................................................................................................... 132 26.11 Feasibility study ...................................................................................................................................................... 133 26.12 Final market study ................................................................................................................................................... 133 26.13 Indicated Mineral resource ...................................................................................................................................... 133 26.14 Inferred Mineral resource ........................................................................................................................................ 133 26.15 Initial assessment .................................................................................................................................................... 133 26.16 Investment and market assumptions ........................................................................................................................ 134 26.17 Limited geological evidence ................................................................................................................................... 134 26.18 Material ................................................................................................................................................................... 134 26.19 Material of economic interest .................................................................................................................................. 134 26.20 Measured Mineral resource ..................................................................................................................................... 134 26.21 Mineral reserve ....................................................................................................................................................... 134 26.22 Mineral resource ..................................................................................................................................................... 134 26.23 Modifying factors .................................................................................................................................................... 134 26.24 Preliminary feasibility study (or pre-feasibility study) ............................................................................................ 135 26.25 Preliminary market study ........................................................................................................................................ 135 26.26 Probable Mineral reserve ........................................................................................................................................ 135 26.27 Production stage issuer ............................................................................................................................................ 135 26.28 Production stage property ....................................................................................................................................... 135 26.29 Proven Mineral reserve ........................................................................................................................................... 135 26.30 Qualified person ...................................................................................................................................................... 135 26.31 Relevant experience ................................................................................................................................................ 136
P a g e 6 | 137 List of Tables Table 1.4.1: St Ives - summary of gold Mineral resources at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,500/oz ...................................................................................................................................................... 11 Table 1.5.1: St Ives - summary of gold Mineral reserves at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,300/oz ...................................................................................................................................................... 12 Table 1.6.1: Capital costs (US$ million) .......................................................................................................................................... 13 Table 1.6.2: Operating costs (US$ million)...................................................................................................................................... 13 Table 2.4.1: List of Qualified persons .............................................................................................................................................. 16 Table 3.3.1: List of St Ives tenements .............................................................................................................................................. 20 Table 6.1.1: Description of stratigraphy ........................................................................................................................................... 33 Table 7.2.1: Summary of St Ives drilling – 2021 ............................................................................................................................. 41 Table 7.4.1: Laboratory testing of core samples .............................................................................................................................. 47 Table 7.5.1: St Ives density values ................................................................................................................................................... 48 Table 7.5.1: Analytical laboratory accreditation .............................................................................................................................. 49 Table 8.2.1: Analytical laboratory accreditation Analytical laboratory accreditation ...................................................................... 50 Table 8.3.1: Laboratory audits ......................................................................................................................................................... 51 Table 8.3.2: Quality control type summary ...................................................................................................................................... 52 Table 10.2.1: Summary of St Ives underground mine areas average sample head analyses ............................................................ 58 Table 10.2.2: Summary of St Ives open pit mine areas average sample head analyses – 1 of 2 ....................................................... 60 Table 10.2.3: Summary of St Ives open pit mine areas average sample head analyses – 2 of 2 ....................................................... 61 Table 10.2.4: Summary of metallurgical samples/tests quantities and summary of average recovery results .................................. 62 Table 10.2.5: December 2021 recovery estimation models by ore source ....................................................................................... 63 Table 10.2.6: Summary of rock abrasion and hardness indices averages by deposit for St Ives samples ........................................ 64 Table 11.1.1: Summary of December 2021 Mineral resource estimation parameters ...................................................................... 71 Table 11.1.2: Open pit resource cutoff grades ................................................................................................................................. 72 Table 11.1.3: Underground resource cutoff grades .......................................................................................................................... 73 Table 11.2.1: St Ives – summary of gold Mineral resources at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,500/oz .............................................................................................................................................. 77 Table 12.2.1: St Ives – recent operating statistics ............................................................................................................................ 81 Table 12.2.2: Summary of material modifying factors..................................................................................................................... 82 Table 12.2.3: Open pit reserve cutoff grades ................................................................................................................................... 84 Table 12.2.4: Underground reserve cutoff grades ............................................................................................................................ 84 Table 12.2.5: St Ives – Open pit and underground and mining equipment ...................................................................................... 87 Table 12.3.1: St Ives – summary of gold Mineral reserves at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,300/oz .............................................................................................................................................. 89 Table 12.5.1: Net difference in Mineral reserves between 31 December 2020 and 31 December 2021 .......................................... 91 Table 13.1.1 Stope and development parameters for current underground mines ............................................................................ 93 Table 13.1.2 Neptune slope configurations ...................................................................................................................................... 94 Table 13.4.1: St Ives mining fleet .................................................................................................................................................... 96 Table 14.3.1: Lefroy process plant – key requirements .................................................................................................................. 101 Table 15.2.1 Waste Dump Design Criteria .................................................................................................................................... 105 Table 15.2.2 Calculation of berm width based on overall rehabilitation angle .............................................................................. 105 Table 16.1.1: Reserve and Resource metal prices .......................................................................................................................... 108 Table 16.2.1: List of SIGMC permits............................................................................................................................................. 113 Table 18.1.1: Capital costs ............................................................................................................................................................. 119 Table 18.2.1: Operating costs ......................................................................................................................................................... 119 Table 19.1.1: LoM physical, operating cost and capital cost inputs and revenue assumptions ...................................................... 121
P a g e 7 | 137 Table 19.1.2: LoM cost and revenue assumptions – Breakdown of ESG ...................................................................................... 122 Table 19.3.1: NPV sensitivity to changes in gold price ................................................................................................................. 122 Table 19.3.2: NPV sensitivity to changes in grade......................................................................................................................... 122 Table 19.3.3: NPV sensitivity to changes in capital costs .............................................................................................................. 122 Table 19.3.4: NPV sensitivity to changes in operating costs.......................................................................................................... 122 Table 19.3.5: NPV sensitivity to changes in discount rate ............................................................................................................. 122 Table 22.1.1: Risks and mitigating actions .................................................................................................................................... 127 List of Figures Figure 1.1.1: Location of St Ives in Western Australia ...................................................................................................................... 8 Figure 3.1.1: St Ives operating sites and infrastructure .................................................................................................................... 17 Figure 3.3.1: St Ives leasing outline and mining areas ..................................................................................................................... 19 Figure 6.1.1: St Ives – regional geology .......................................................................................................................................... 32 Figure 6.1.2: Stratigraphic section through St Ives showing gold deposit positions ........................................................................ 34 Figure 6.2.1: Cross section showing the Geology at the Invincible Mine ........................................................................................ 36 Figure 6.2.2: Paleochannel schematic showing the geology at St Ives............................................................................................. 37 Figure 6.2.3: Long Section showing geology at the Neptune open pit ............................................................................................. 37 Figure 6.2.4: Long Section showing geology at the Hamlet Mine ................................................................................................... 38 Figure 7.1.1: Location of exploration areas...................................................................................................................................... 40 Figure 7.2.1: Schematic long-section through Invincible Mine ....................................................................................................... 44 Figure 7.2.2: Schematic long-section through Hamlet North Mine .................................................................................................. 45 Figure 7.2.3: Schematic Plan View of the Neptune Mine ................................................................................................................ 46 Figure 13.5.1: N-S section of Invincible complex............................................................................................................................ 97 Figure 13.5.2: S-N section of Hamlet North complex ...................................................................................................................... 97 Figure 13.5.3: Plan view of the Revenge complex ........................................................................................................................... 98 Figure 14.1.1: Schematic flow diagram of Lefroy process plant ...................................................................................................... 99 Figure 15.1.1: Lefroy Central Corridor Infrastructure................................................................................................................... 103 Figure 15.2.1 Waste dump design definitions ................................................................................................................................ 106
8 | 137 1 Executive summary This technical report summary was prepared for Gold Fields Limited (Gold Fields or the Company or the Registrant), a production stage issuer. The purpose of this technical report summary is to support the disclosure of exploration results, Mineral resources and Mineral reserves for the St Ives Gold Mine (St Ives), a production stage property located in Western Australia, in accordance with the Securities and Exchange Commission (SEC) property disclosure requirements for mining Registrants as specified in Subpart 229.1300 of Regulation S-K - Disclosure by Registrants Engaged in Mining Operations. The effective date of this technical report summary is 31 December 2021. Unless otherwise specified, all units of currency are in United States dollars ($). All measurements are metric with the exception of troy ounces (oz). 1.1 Property description and ownership St Ives is located approximately 80 km south-southeast of the regional city of Kalgoorlie-Boulder and approximately 630 km east of the capital city of Perth in Western Australia (Figure 1.1.1). Figure 1.1.1: Location of St Ives in Western Australia Source: St Ives CPR, 2021 St Ives Gold Mining Company Pty Ltd (SIGMC), a wholly owned subsidiary of Gold Fields has 100 % ownership of 263 granted Mining Leases, 27 granted Exploration Licenses and 1 Prospecting Licence covering an area of 120,292 ha, and 24 Miscellaneous Licenses covering an area of 134,933 ha inclusive of 134,713 ha for water exploration.
P a g e 9 | 137 SIGMC holds an interest in 49 non-managed leases totalling 6,747 ha and 13 joint venture tenements with Lefroy Exploration totalling 37,212 ha in which SIGMC is currently earning an interest. The major components of the St Ives gold mining and processing operation are: The operating Invincible and Hamlet underground mines accessed by declines. The operating Neptune and Delta Island open pit mines. A 4.7 Mt/pa carbon-in-pulp (CIP) process plant with SAG mill. Tailings storage facilities (TSF). Administration centers. Ore is trucked to the central processing facility via a network of haul roads and causeways. 1.2 Geology and mineralisation The St Ives property lies within the Kalgoorlie Terrane, part of the Norseman-Wiluna Greenstone Belt of the Archean Yilgarn Craton, a 2.7 Ga granite-greenstone superterrane in southern Western Australia. Within the Kalgoorlie Terrance the Kambalda Domain is bound by the north-northwest trending Boulder-Lefroy Fault (Boorara Domain) and Zuleika Shear (Coolgardie Domain). The geology of the St Ives area is broadly divided into three main sequences: Late Meroguil Sequence - Late stage epiclastic sedimentary rocks. Middle Kalgoorlie Sequence - Felsic to intermediate volcano-sedimentary rocks. Early Kambalda Sequence – Ultramafic/mafic rock package. Most of the known gold deposits are proximal to the axial plane of the gently south-plunging Kambalda Anticline, which extends 35 km from the southern end of the Kambalda Dome to the Junction mine. A major second order structure known as the NNW trending Playa Shear splays off the Boulder-Lefroy Fault and strikes through the St Ives property for more than 10 km. Most of the gold orebodies at St Ives are associated with third order splays off the Playa Shear. Mineralisation typically occurs where these structures intersect favourable rock units with chemical or rheological contrasts combining with structural flexures to form the most important local controls to gold mineralisation. The most common host rock is granophyric dolerite of the Kambalda sequence (Defiance, Junction and Condenser Dolerite) and the Kapai Slate. At least 80 individual deposits have been mined in the St Ives area to date. The current major production centres at St Ives are the Invincible deposits, the Neptune paleochannel and underlying lodes and the Hamlet deposit. Invincible is hosted in northwest trending, steeply southwest dipping Archean volcaniclastic sediments of the Black Flag Mudstone and the Black Flag Andesite of the Kalgoorlie Sequence. Gold mineralisation occurs as stacked sub vertical quartz breccia lodes mainly within the Black Flag Mudstone, and extensional quartz vein stockworks in the footwall of the Black Flag Andesite. Quartz veining, combined with albite-pyrite alteration, is directly related to high- grade mineralisation. Two prominent shear zones are associated with the Invincible deposit, the Merougil shear and the Morgan Island shear. The Neptune deposit consists of three main mineralisation styles: paleochannel, supergene and fresh lode material. The largest and most significant contribution comes from paleochannel gold deposited within a main east-west channel, minor tributaries and paleo-slope sheetwash. The underlying fresh lode structures trend roughly north-south and generally dip moderately to the east. The Hamlet deposit is hosted within the Paringa Basalt and occurs in a north trending reverse shear zone. The gold mineralisation is associated with a biotite alteration halo hosting quartz-albite and quartz-carbonate veins. The high- grade portion comprises breccia zones and vein or stockwork vein arrays while the Hamlet North deposit is hosted in the Defiance Dolerite Unit 4 where the Hamlet shear intercepts this unit at high angles.
P a g e 10 | 137 1.3 Exploration, development and operations The St Ives operation currently comprises the Neptune open pit, Invincible South and Hamlet North underground mines with associated infrastructure and facilities that operate year-round. The underground mines are accessed via declines. Mining contractors employ mostly long-hole stoping methods with paste/rock fill. The underground mines are relatively shallow and configured to mitigate geotechnical seismic risk through mine design, scheduling and defined ground support regimes. The open pits are mined using conventional drill and blast with truck and shovel. Surface mining operations are conducted using an owner-operator mining fleet. Ore from individual mining operations is transported with road trains to the central Lefroy processing facility. The recent production performance of St Ives is summarised in Table 12.2.1. There is a strong history of replacing and extending Mineral resources and reserves through down dip extensional drilling and exploration for additional proximal deposits at St Ives. Annual exploration programs are however limited in their ability to define mineralisation ahead of current workings because they rely increasingly on underground development to provide drill platforms as operations transition to a predominantly underground operation. Nevertheless, there remains a high probability that exploration will be able to sustain reserve growth beyond the current life of mine. Emphasis is currently on the continued expansion of the Invincible underground operations with full production now established. SIGMC is assessing the potential to expand Invincible production from the current 1.5 Mt/a to 2 Mt/a over the next three years. At Hamlet North, focus is on extending the mine down dip of the current Mineral reserve following encouraging exploration drilling results. Open pit production continues at the Neptune complex, mining from pit Stages 5 and 6. Exploration drilling has significantly expanded the Neptune Stage 7 open pit, merging it with the main Neptune open pit. Pre-stripping of this cut-back commenced in late 2020. Feasibility studies on Invincible Deeps underground and the Delta Island, Pistol Club and Justice open pits were progressed. Pre-feasibility studies are planned for the greater Invincible underground extensions and the Swiftsure and Santa Ana open pits. Exploration drilling targeted additions to the Invincible and Neptune complexes. Drilling at Invincible is focused on the conversion of open pit resources at Invincible Footwall South and Lut into reserves. Growth in underground reserves at Invincible will be targeted by surface drilling at Invincible South, and assessing strike extensions from underground drilling at Invincible South and the Link area between the Invincible and Invincible Deeps zones. Drilling completed at Hamlet North extended economic mineralisation down dip of the current reserve. Extensional drilling is ongoing at the Neptune Surface complex, targeting additional open pit stages. Brownfield exploration continued to focus on the Lefroy Exploration joint venture, the Central Corridor, Kambalda West, and the Eastern and Western Basin areas. The Northern Speedway trend was explored for its open pit potential. A small resource was added at the Lut target adjacent to the Invincible Stage 7 open pit reserve as part of the Speedway North drilling. 1.4 Mineral resource estimates Mineral resources exclusive of Mineral reserves as at 31 December 2021 are summarised in Table 1.4.1. Mineral resources at St Ives are 100 % attributable to Gold Fields. The point of reference for the Mineral resources is in-situ gold mineralisation, except for underground Mineral resources, which have minimum mining width applied.
P a g e 11 | 137 Table 1.4.1: St Ives - summary of gold Mineral resources at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,500/oz Resources (exclusive of Mineral reserves) Cutoff grades/ (g/t Au) Metallurgical recovery/ (%) Amount/ (kt) Grades/ (g/t Au) Amount/ (koz Au) Underground Mineral resources UG measured Mineral resources 542 4.4 77 1.9 to 3.8 85 % to 96.6 % UG indicated Mineral resources 4,713 4.0 602 1.9 to 3.8 85 % to 96.6 % UG measured + indicated Mineral resources 5,255 4.0 678 1.9 to 3.8 85 % to 96.6 % UG inferred Mineral resources 7,990 4.3 1,093 1.9 to 3.8 85 % to 96.6 % Open Pit Mineral resources OP measured Mineral resources 674 2.9 64 0.71 to 1.05 89.3 % to 97.7 % OP indicated Mineral resources 4,665 2.3 350 0.71 to 1.05 89.3 % to 97.7 % OP measured + indicated Mineral resources 5,339 2.4 414 0.71 to 1.05 89.3 % to 97.7 % OP inferred Mineral resources 1,806 2.7 158 0.71 to 1.05 89.3 % to 97.7 % Stockpile Mineral resources SP measured Mineral resources - - - SP indicated Mineral resources - - - SP measured + indicated Mineral resources - - - SP inferred Mineral resources - - - Total St Ives Mineral resources Total measured Mineral resources 1,216 3.6 140 Total indicated Mineral resources 9,378 3.2 952 Total measured + indicated Mineral resources 10,594 3.2 1,092 Total inferred Mineral resources 9,796 4.0 1,252 Notes: a) Rounding of figures may result in minor computational discrepancies. b) Mineral resources are exclusive of Mineral reserves. c) Mineral resources categories are assigned with consideration given to geological complexity, grade variance, drillhole intersection spacing and proximity of mining development. d) Quoted as diluted in-situ metric tonnes and grades. Metallurgical recovery factors have not been applied to the Mineral resource estimates. The metallurgical recovery is the ratio, expressed as a percentage, of the mass of the specific mineral product recovered from ore treated at the process plant to its total specific mineral content before treatment. St Ives mining operations vary according to the mix of the source material (e.g. oxide, transitional, fresh and ore type blend). e) The metal prices used for the 2021 Mineral resources are based on a gold price of $1,500 per ounce (at an exchange rate of A$1:$0.75). Open pit Mineral resources at the Australian operations are similarly based on revenue factor 1 pits and the underground Mineral resources on appropriate mine design and extraction schedules. The gold price used for Mineral resources approximates 15 % higher than the selected Mineral reserve. f) The cutoff grade may vary per shaft, open pit or underground mine, depending on the respective costs, depletion schedule, ore type, expected mining dilution and expected mining recovery. The average or range of cutoff grade values applied to the Mineral resources are; St Ives 1.9 g/t to 3.8 g/t Au mill feed (underground) and 0.7 g/t to 1.05 g/t Au (open pit). g) The Mineral resources are based on initial assessments at the resource gold price of $1,500/oz and consider estimates of all St Ives costs, the impact of modifying factors such as mining dilution and mining recovery, processing recovery and royalties. Mineral resources are also tested through the application of Environmental, Social and Governance (ESG) criteria to demonstrate reasonable prospects for economic extraction. h) The Mineral resources are estimated at a point in time and can be affected by changes in the gold price, US Dollar currency exchange rates, permitting, legislation, costs and operating parameters. Source: St Ives CPR, 2021
P a g e 12 | 137 1.5 Mineral reserve estimates The St Ives Mineral reserves as of 31 December 2021 are summarised in Table 1.5.1. The Mineral reserves are 100 % attributable to Gold Fields and are net of production depletion up to 31 December 2021. The point of reference for the Mineral reserves is ore delivered to the processing facility. Table 1.5.1: St Ives - summary of gold Mineral reserves at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,300/oz Amount/ (kt) Grades/ (g/t Au) Amount/ (koz Au) Cutoff grades/ (g/t Au) Metallurgical recovery/ (%) Underground Mineral resources UG proven Mineral reserves 1,734 5.1 287 2.5 to 3.5 92.8 % to 96.5 % UG probable Mineral reserves 11,526 4.6 1,693 2.5 to 3.5 92.8 % to 96.5 % UG total Mineral reserves 13,260 4.6 1,980 2.5 to 3.5 92.8 % to 96.5 % Open Pit Mineral reserves OP proven Mineral reserves 63 2.2 4 0.35 to 0.40 89.5 % to 97.6 % OP probable Mineral reserves 3,852 2.3 282 0.35 to 0.40 89.5 % to 97.6 % OP total Mineral reserves 3,915 2.3 286 0.35 to 0.40 89.5 % to 97.6 % Stockpile Mineral reserves SP proven Mineral reserves 2,906 1.6 146 0.35 to 0.40 89.5 % to 97.6 % SP probable Mineral reserves - - - SP total Mineral reserves 2,906 1.6 146 0.35 to 0.40 89.5 % to 97.6 % Total Mineral reserves Total proven Mineral reserves 4,703 2.9 437 Total probable Mineral reserves 15,378 4.0 1,975 Total St Ives Mineral reserves 2021 20,081 3.7 2,412 Total St Ives Mineral reserves 2020 25,479 3.3 2,665 Year on year difference (%) -21% 15% -9% Notes: a) Rounding of figures may result in minor computational discrepancies. b) Refer to Table 12.5.1 for year-on-year Mineral reserve comparison c) Quoted as mill delivered metric tonnes and run-of-mine (RoM) grades, inclusive of all mining dilutions and gold losses except mill recovery. Metallurgical recovery factors have not been applied to the reserve figures. The metallurgical recovery is the ratio, expressed as a percentage, of the mass of the specific mineral product recovered from ore treated at the process plant to its total specific mineral content before treatment. The recoveries for St Ives vary according to the mix of the source material (e.g. oxide, transitional fresh and ore type blend) and method of treatment. d) The metal prices used for the 2021 LoM Mineral reserves are based on a gold price of $1,300 per ounce (at an exchange rate of A$1:$0.74). Open pit Mineral reserves at St Ives are based on optimised pits and the underground operations on appropriate mine design and extraction schedules. The gold price used for Mineral reserves is detailed in particularity in chapter 16 Marketing. e) Dilution relates to planned and unplanned waste and/or low-grade material being mined and delivered to the process plant. Ranges are given for those operations that have multiple orebody styles and mining methodologies. The mine dilution factors are 5 % to 52 % (open pit) and 5 % to 57 % (underground). f) The mining recovery factor relates to the proportion or percentage of ore mined from the defined orebody at the gold price used for the declaration of Mineral reserves. This percentage will vary from mining area to mining area and reflects planned and scheduled reserves against actual tonnes, grade and metal mined, with all modifying factors, mining constraints and pillar discounts applied. The mining recovery factors are 90 % to 93 % (underground) and 91 % to 100 % (open pit). g) The cutoff grade may vary per shaft, open pit or underground mine, depending on the respective costs, depletion schedule, ore type, expected mining dilution and expected mining recovery. The average or range of cutoff grade values applied in the planning process are: St Ives 2.5 g/t to 3.5 g/t Au mill feed (underground) and 0.35 g/t to 0.40 g/t Au (open pit). h) An ounces-based Mine Call Factor (metal called for over metal accounted for) determined primarily on historic performance but also on realistic planned improvements where appropriate is applied to the Mineral reserves. A Mine Call Factor of 100 % has been applied at St Ives. i) The Mineral reserves are estimated at a point in time and can be affected by changes in the gold price, US Dollar currency exchange rates, permitting, legislation, costs and operating parameters. j) St Ives is 100 % attributable to Gold Fields and is entitled to mine all declared material located within the properties mineral leases and all necessary statutory mining authorisations and permits are in place or have reasonable expectation of being granted. Source: St Ives CPR, 2021
P a g e 13 | 137 The St Ives Mineral reserves are the economically mineable part of the measured and indicated Mineral resources based on LoM schedules and pre-feasibility studies completed at the reserve gold price of $1,300/oz to justify their economic viability as at 31 December 2021 (refer to Section 19 for details on the supporting economic analysis). A pre-feasibility study has an estimated accuracy of ±25 % with a contingency of no more than 15 %. 1.6 Capital and operating cost estimates 1.6.1 Capital The capital costs for the Mineral reserve LoM plan are based on detailed requirements for the next two years and have in general an order of accuracy of ±10 %. Capital estimates beyond two years, are based on pre-feasibility or better estimates for infrastructure and development requirements for individual projects. The forecast capital costs are summarised in Table 1.6.1. Table 1.6.1: Capital costs (US$ million) Capital cost Units 2022 2023 2024 2025 2026 2027 2028 2029 2030 Capital $ million 96.6 78.8 79.5 52.0 38.4 24.6 18.6 16.7 7.7 Note: a) The detailed capital cost schedule is presented in Table 18.1.1. b) This capital summary estimate is for the Mineral reserve LoM schedule. c) Closure costs are included in operating costs. Source: St Ives CPR, 2021 1.6.2 Operating costs Operating costs are based on general planning assumptions or project-specific planning assumptions where applicable. Forecast operating costs for the Mineral reserve LoM plan are summarised in Table 1.6.2. Table 1.6.2: Operating costs (US$ million) Operating cost Units 2022 2023 2024 2025 2026 2027 2028 2029 2030 Operating costs $ million 262.1 277.2 227.6 238.2 232.5 211.5 197.1 177.3 99.1 Note: a) The detailed operating cost schedule is presented in Table 18.2.1. b) This operating cost summary estimate is for the Mineral reserve LoM schedule. c) Closure costs are presented from 2031 onwards. Source: St Ives CPR, 2021 1.7 Permitting SIGMC has security of tenure for all current exploration and mining tenements that contribute to Mineral resources and reserves. St Ives operates in compliance with relevant environmental legislation and remains compliant regarding key environmental risks, namely: TSFs, processing of ore, land disturbance, chemical blending and storage, sewage and landfill operations and mine dewatering. All other permitting and licensing requirements to start any future mining operation, including but not limited to, issues of Aboriginal cultural heritage, local disturbance, clearing, environmental, power and water extraction/disposal permitting, follow well established authorisation protocols with the relevant state authorities. Current permitting consists of: Department of Water and Environmental Regulation: o Ministerial Statement 1128 provides approval for land access and disturbance over a defined part of the St Ives operation. o Environmental Licence L8485 provides authorisation of defined polluting activities. o Ground water licence 171060 provides for abstraction of raw water from our production bore field.
P a g e 14 | 137 o Ground water Licence 62505 and 205729 provide for dewatering of mining areas. Department of Mines, Industry Regulation and Safety: o One Mining Proposal RegID 81919 provides for approval for mining related activities, other than exploration, within active and historic mining areas within the operating area. o Mine Closure Plan RegID 88163 provides for progressive and end of mine closure and rehabilitation. o A range of Programs of Works provide approval for exploration activities across all SIGM tenements. o A range of Native Vegetation Clearing Permits for clearing not otherwise addressed by other approvals. Department of Planning, Lands and Heritage: o Aboriginal heritage surveys are conducted on an ongoing basis across much of the site. Currently, there are no legal or stakeholder issues that are likely to impact the mining operations. In 2014, a claim under the Native Title Act 1993 (Cth) by the Ngadju People (WAD6020/1998) over an area including part of the St Ives property was determined by the Federal Court. In 2019, a Native Title claim by the Marlinyu Ghoorlie People (WAD647/2017) over a separate area also covering part of the St Ives property was registered. St Ives is currently engaged in early discussions with the Marlinyu Ghoorlie People under the ‘right to negotiate’ process with respect to certain exploration tenure. SIGMC consults with relevant Aboriginal stakeholder groups (including the Ngadju and the Marlinyu Ghoorlie Peoples) to ensure that areas of Aboriginal cultural heritage are identified and recorded. Some of these processes are covered by heritage management agreements. SIGMC also engages on a range of development activities in the host communities in which the mines are situated. The overall closure liability for St Ives is currently estimated at $118.2 million with closure discussed in Section 17.5. 1.8 Conclusions and recommendations The St Ives Mineral reserves currently support a 9 year LoM plan that values the operation at $206.7 million NPV at the reserve gold price of $1,300/oz. SIGMC continues to discover and replace Mineral reserves that contribute to sustained growth and extending the LoM profile. Ongoing investment in exploration and infrastructure is justified by the positive economic analysis. It is recommended that further exploration is carried out at the following areas which have a good probability of extending mine life: Greater Invincible down dip and in the footwall. Central Corridor of the St Ives tenement package targeting new underground resources. Extension of existing Open Pit resources and conversion into reserves through mining studies. Early stage exploration at the Lefroy Joint Venture, Kambalda West, Eastern Basins and Western Basins searching for new Open Pit discoveries. Gold Fields’ commitment to materiality, transparency and competency in its Mineral resources and Mineral reserves disclosure to regulators and in the public domain is of paramount importance to the Qualified person and the Registrants Executive Committee and Board of Directors continue to endorse the company’s internal and external review and audit assurance protocols. This Technical Report Summary should be read in totality to gain a full understanding of St Ives’s Mineral resource and Mineral reserve estimation and reporting process, including data integrity, estimation methodologies, modifying factors, mining and processing capacity and capability, confidence in the estimates, economic analysis, risk and uncertainty and overall projected property value. However, to ensure consolidated coverage of the company’s primary internal controls in generating Mineral resource and reserve estimates a key point summary is provided in Chapter 21 for reference.
P a g e 15 | 137 2 Introduction 2.1 Registrant for whom the technical report summary was prepared This technical report summary was prepared for Gold Fields Limited (Gold Fields or the Company or the Registrant), a production stage issuer. 2.2 Terms of reference and purpose of the technical report summary The purpose of this technical report summary is to support the disclosure of exploration results, Mineral resources and Mineral reserves for the St Ives Gold Mine (St Ives or the Property), a production stage property located in Western Australia, in accordance with the Securities and Exchange Commission (SEC) property disclosure requirements for mining Registrants as specified in Subpart 229.1300 of Regulation S-K – Disclosure by Registrants Engaged in Mining Operations. The effective date of this technical report summary is 31 December 2021. The Mineral resources and Mineral reserves disclosed in this technical report summary were reported in accordance with the South African Code for the Reporting of Exploration Results, Mineral Resources and Mineral Reserves (SAMREC Code 2016). SAMREC is based on the Committee for Mineral Reserves International Reporting Standards (CRIRSCO) Reporting Template 2019. 2.3 Sources of Information This technical report summary is principally based on information disclosed in the “Competent Person’s Report on the Material Assets of St Ives Gold Mine as of 31 December 2021” prepared by St Ives management on behalf of the Company. The Competent Person’s Report (CPR) was supplemented by technical reports and studies prepared by the Company and third-party specialists engaged by the Company as cited throughout this technical report summary and listed in Section 24. Reliance was also placed on certain economic, marketing and legal information beyond the expertise of the Qualified persons used in the determination of modifying factors. This information provided by the Company is cited throughout this technical report summary and listed in Section 25. All units of currency are in United States dollars ($) unless otherwise indicated. All measurements are metric with the exception of troy ounces (oz). 2.4 Qualified persons and details of inspection The Qualified persons responsible for the preparation of this technical report summary are listed in Table 2.4.1. All the Qualified persons are eligible members in good standing of a recognised professional organisation (RPO) within the mining industry and have at least five years of relevant experience in the type of mineralisation and type of deposit under consideration and in the specific type of activity that the Qualified person is undertaking on behalf of the Company at the time this technical report summary was prepared. The Qualified persons were appointed by Gold Fields. The RPO affiliation in good standing was also reviewed by Gold Fields.
P a g e 16 | 137 Table 2.4.1: List of Qualified persons Incumbent Employer Position Affiliation in good standing Relevant experience (years) Details of inspection Responsibility for which chapters Dr Julian Verbeek Gold Fields VP Geology and Mineral Resources FAusIMM - 207994 34 7 – 8 Oct 2021 This document has been prepared under the supervision of and reviewed by Julian Verbeek. Chapters 1-26 Richard Butcher Gold Fields Chief Technical Officer GFL Group Technical Services FAusIMM CP - 211182 41 18 Mar 2021 6 Sep 2021 Overview and review of document. Chapters 1-5, 12-13 & 15-26 Dr Winfred Assibey- Bonsu Gold Fields Group Geostatistician and Evaluator FSAIMM - 400112/00 35 Has attended site Review of Resources and Reserves. Chapters 8 - 9 & 11 Andrew Engelbrecht Gold Fields Group Geologist AusIMM - 224997 22 Has not attended site Geology and Resources. Chapters 6 - 9 & 11 Peter Andrews Gold Fields VP: Geotechnical FAusIMM CP - 302255 25 11 – 13 Aug 2021 Geotechnical review. Chapters 7.4, 15.2, 17.3.2 Daniel Hillier Gold Fields VP: Metallurgy FAusIMM CP - 227106 31 27 – 28 Jul 2021 Chapters 10 & 14 Johan Boshoff Gold Fields Group Head of Tailings FAusIMM - 1007564 26 12 Jan 2021 15 Nov 2021 3 Aug 2021 Tailings Review. Chapters 15.1 & 17.3.1 Andre Badenhorst Gold Fields Group Technical and Reporting Governance Manager AusIMM - 309882 41 Has attended site Chapters 1-26 Fiona Phillips Gold Fields VP: Technical AusIMM - 112538 24 Twice a year. Overview and review of document. Chapters 1-5, 10 & 12-26 Trent Strickland Gold Fields Principal Geologist: Resources & Reserves AusIMM - 211953 AIG - 6761, 17 Twice a year. Geology and Resources. Chapters 1 - 11 Michael Fitzgerald Gold Fields Manager: Geology AusIMM - 220122 17 Site employee Chapters 1-26 Mark Ritchie Gold Fields Senior Resource Geology AusIMM - 326209 10 Quarterly visits. Resources Estimation Chapters 8 - 9 & 11 Hamish Guthrie Gold Fields Superintendent: Mine Planning AusIMM - 210899 23 Quarterly visits. Reserves and Mining Chapters 1-5, 10 & 12-26 Notes a) The Qualified persons where not all able to attend site in 2021 for Mineral Reserve and Mineral Resource reviews, however, the Mineral Reserve and Mineral Resource were reviewed according to the chapter 21 description. Members of the QP team have attended site historically. 2.5 Report version update This is the maiden technical report summary filed by Gold Fields on the St Ives property in Western Australia.
P a g e 17 | 137 3 Property description 3.1 Property location The St Ives property is approximately 80 km south-southeast of the regional city of Kalgoorlie-Boulder at latitude 31 º 19’ 12.6” S and longitude 121 º 44’ 25.5” E. Kalgoorlie-Boulder is approximately 630 km east of the capital city of Perth in Western Australia (Figure 1.1.1). The nearest population centre is the town of Kambalda, situated 21 km by road, to the immediate north of the Property (Figure 3.1.1). The closest major population centre is the city of Kalgoorlie-Boulder (population 30,000), approximately 70 km by road to the north. Figure 3.1.1: St Ives operating sites and infrastructure Source: St Ives CPR, 2021
P a g e 18 | 137 3.2 Ownership and area St Ives Gold Mining Company Pty Ltd (SIGMC), I 098 386 273, was incorporated in Australia in 2001 as the legal entity holding and conducting mining activity on the St Ives property. Gold Fields holds 100 % of the issued shares of SIGMC through its 100 % attributable holding in the issued shares of Orogen Holding (BVI) Limited. 3.3 Property mineral titles, claims, mineral rights, leases and options The Company via its wholly owned subsidiary SIGMC has 100 % ownership of 263 granted Mining Licences, 27 granted Exploration Licenses and 1 Prospecting Licence covering an area of 120,292 ha, and 24 Miscellaneous Licenses covering an area of 134,934 ha. All tenements are registered in the name of SIGMC which has security of tenure for all current exploration and mining leases that contribute to the Mineral resources and reserves described in this report. SIGMC does not have freehold ownership to any of the mining areas. SIGMC holds an interest in 49 non-managed leases totalling 6,752 ha and 13 joint venture tenements with Lefroy Exploration (ASX: LEX) totalling 37,213 ha in which SIGMC is currently earning an interest. On 6 June 2018, St Ives entered into a Farm in Agreement with Hogans Resources Pty Ltd and Lefroy Exploration Ltd (LEX JV) where St Ives may earn up to a 70 % interest in the LEX JV tenements through the funding of exploration. A summary of the tenements is shown in Table 3.3.1 and illustrated in Figure 3.3.1.
P a g e 19 | 137 Figure 3.3.1: St Ives leasing outline and mining areas Source: St Ives CPR, 2021
P a g e 20 | 137 Table 3.3.1: List of St Ives tenements Number Grant date Expiry date Area Annual rent (US$) Min annual Expenditure (US$) Reporting Group Term Granted Exploration Licences E15/1010 20-Aug-08 19-Aug-22 11 BL $5,511 $51,800 St Ives – C052/2002 5 Years (Extended) E15/1347 27-Oct-21 26-Oct-26 3 BL $324 $11,100 5 Years E15/1385 22-Jan-14 21-Jan-24 1 BL $14,800 Kambalda West – C115/2013 5 Years (Extended) E15/1418 17-Dec-15 16-Dec-25 10 BL $5,010 $37,000 Merougil – C015/2018 5 Years (Extended) E15/1447 02-Aug-16 01-Aug-26 49 BL $12,981 $72,520 Lefroy West – C106/2018 5 Years (Extended) E15/1457 * 11-Aug-15 10-Aug-25 8 BL $4,008 $37,000 Kambalda West – C115/2013 5 Years (Extended) E15/1471 13-Jan-16 12-Jan-26 26 BL $13,025 $38,480 St Ives – C052/2002 5 Years (Extended) E15/1516 23-Oct-17 22-Oct-22 6 BL $1,590 $22,200 Merougil – C015/2018 5 Years E15/1517 21-Sep-17 20-Sep-22 3 BL $795 $14,800 Merougil – C015/2018 5 Years E15/1518 21-Sep-17 20-Sep-22 2 BL $530 $14,800 Merougil – C015/2018 5 Years E15/1519 21-Sep-17 20-Sep-22 2 BL $530 $14,800 Merougil – C015/2018 5 Years E15/1551 24-Feb-17 23-Feb-22 13 BL $3,444 $22,200 No Group Reporting 5 Years E15/1574 11-Oct-17 10-Oct-22 29 BL $7,683 $32,190 No Group Reporting 5 Years E15/1592 13-Oct-17 12-Oct-22 1 BL $300 $7,400 Merougil – C015/2018 5 Years E15/1593 13-Oct-17 12-Oct-22 1 BL $300 $7,400 Merougil – C015/2018 5 Years E15/1594 13-Oct-17 12-Oct-22 2 BL $530 $14,800 Merougil – C015/2018 5 Years E15/1595 13-Oct-17 12-Oct-22 2 BL $530 $14,800 Merougil – C015/2018 5 Years E15/1615 28-Mar-18 27-Mar-23 7 BL $1,357 $22,200 Lefroy West – C106/2018 5 Years E15/1638 09-Apr-19 08-Apr-24 44 BL $8,531 $32,560 No Group Reporting 5 Years E15/1685 17-Apr-19 16-Apr-24 3 BL $582 $11,100 No Group Reporting 5 Years E15/972 * 04-Jun-08 03-Jun-22 10 BL $5,010 $51,800 Kambalda West – C115/2013 5 Years (Extended) E15/973 * 19-May-08 18-May-22 7 BL $3,507 $51,800 Kambalda West – C115/2013 5 Years (Extended) E15/974 * 28-Jul-09 27-Jul-23 9 BL $4,509 $51,800 Kambalda West – C115/2013 5 Years (Extended) E15/975 03-Oct-08 02-Oct-22 21 BL $10,521 $51,800 Kambalda West – C115/2013 5 Years (Extended) E15/978 01-Apr-08 31-Mar-22 7 BL $3,507 $51,800 St Ives – C052/2002 5 Years (Extended) E15/980 01-Apr-08 31-Mar-22 10 BL $5,010 $51,800 St Ives – C052/2002 5 Years (Extended) E15/984 03-Jul-08 02-Jul-22 10 BL $5,010 $51,800 Kambalda West – C115/2013 5 Years (Extended) E26/131 10-Aug-09 09-Aug-23 8 BL $4,008 $51,800 Lefroy West – C106/2018 5 Years (Extended) E26/134 29-Mar-10 28-Mar-22 6 BL $3,006 $51,800 Lefroy West – C106/2018 5 Years (Extended) E26/150 15-Mar-11 14-Mar-23 1 BL $300 $14,800 Lefroy West – C106/2018 5 Years (Extended) E26/184 30-May-16 29-May-26 50 BL $13,246 $74,000 Lefroy West – C106/2018 5 Years (Extended) E26/193 18-Aug-17 17-Aug-22 7 BL $1,854 $22,200 Lefroy West – C106/2018 5 Years E26/196 03-Oct-17 02-Oct-22 9 BL $2,384 $22,200 No Group Reporting 5 Years E26/203 15-Mar-19 14-Mar-24 3 BL $582 $11,100 No Group Reporting 5 Years General Purpose Leases G15/22 14-Jun-11 13-Jun-32 89.05500 HA $1,312 St Ives – C052/2002 21 Years Miscellaneous Licences L15/117 10-Oct-89 09-Oct-24 2.20840 HA $44 5 Years (Renewed) L15/118 10-Oct-89 09-Oct-24 1.14510 HA $29 5 Years (Renewed) L15/137 19-Mar-90 18-Mar-25 0.72010 HA $15 5 Years (Renewed) L15/145 18-Oct-90 17-Oct-25 20.55950 HA $306 5 Years (Renewed) L15/146 18-Oct-90 17-Oct-25 10.76380 HA $160 5 Years (Renewed) L15/147 18-Oct-90 17-Oct-25 62.49570 HA $918 5 Years (Renewed) L15/178 08-Dec-92 07-Dec-22 4.74000 HA $73 5 Years (Renewed) L15/245 25-Sep-03 24-Sep-24 14,177.00000 HA $6,295 21 Years L15/250 01-Dec-03 30-Nov-24 51.20000 HA $758 21 Years L15/256 26-May-04 25-May-25 16.70000 HA $248 21 Years L15/263 19-Dec-05 18-Dec-26 41.00000 HA $598 21 Years L15/276 26-Nov-07 25-Nov-28 48.38500 HA $714 21 Years L15/279 24-Oct-08 23-Oct-29 24.00000 HA $350 21 Years L15/404 19-Mar-21 18-Mar-42 3,409.89349 HA $1,514 21 Years L15/416 19-Mar-21 18-Mar-42 62,791.86213 HA $27,880 21 Years L15/417 19-Mar-21 18-Mar-42 8,451.78423 HA $3,753 21 Years L15/418 19-Mar-21 18-Mar-42 8,454.36513 HA $3,754 21 Years L15/419 19-Mar-21 18-Mar-42 18,012.71334 HA $7,998 21 Years L15/420 19-Mar-21 18-Mar-42 19,415.31381 HA $8,621 21 Years L15/80 13-Oct-88 12-Oct-23 42.56470 HA $627 5 Years (Renewed) L15/85 16-Feb-89 15-Feb-24 1.60460 HA $29 5 Years (Renewed) L15/86 16-Feb-89 15-Feb-24 1.92540 HA $29 5 Years (Renewed) L26/178 18-Sep-91 17-Sep-26 4.81220 HA $73 5 Years (Renewed)
P a g e 21 | 137 Number Grant date Expiry date Area Annual rent (US$) Min annual Expenditure (US$) Reporting Group Term Granted Mining Licences M15/1065 23-Dec-10 22-Dec-31 9.68800 HA $163 $7,400 Kambalda West – C115/2013 21 Years M15/1221 26-Oct-04 25-Oct-25 981.65000 HA $15,987 $72,668 Kambalda West – C115/2013 21 Years M15/1222 26-Oct-04 25-Oct-25 869.90000 HA $14,164 $64,380 Kambalda West – C115/2013 21 Years M15/1223 26-Oct-04 25-Oct-25 210.40000 HA $3,435 $15,614 Kambalda West – C115/2013 21 Years M15/1224 26-Oct-04 25-Oct-25 913.75000 HA $14,880 $67,636 Kambalda West – C115/2013 21 Years M15/1226 01-May-01 30-Apr-22 852.85000 HA $13,887 $63,122 St Ives – C052/2002 21 Years M15/1227 01-May-01 30-Apr-22 832.65000 HA $13,561 $61,642 St Ives – C052/2002 21 Years M15/129 04-Feb-85 03-Feb-27 29.04000 HA $488 $7,400 St Ives – C052/2002 21 Years (Renewed) M15/1379 23-Dec-10 22-Dec-31 8.36500 HA $147 $7,400 Kambalda West – C115/2013 21 Years M15/1488 24-Dec-04 23-Dec-25 119.75000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1489 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1490 24-Dec-04 23-Dec-25 119.35000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1491 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1492 24-Dec-04 23-Dec-25 121.30000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1493 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1494 24-Dec-04 23-Dec-25 121.30000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1495 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1496 24-Dec-04 23-Dec-25 121.30000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1497 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1498 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1499 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1500 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1501 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1502 24-Dec-04 23-Dec-25 121.25000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1503 24-Dec-04 23-Dec-25 121.50000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1504 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1505 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1506 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1507 24-Dec-04 23-Dec-25 121.30000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1508 24-Dec-04 23-Dec-25 121.20000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1509 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1510 24-Dec-04 23-Dec-25 121.15000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1511 24-Dec-04 23-Dec-25 121.45000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1512 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1513 24-Dec-04 23-Dec-25 121.20000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1514 24-Dec-04 23-Dec-25 120.95000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1515 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1516 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1517 24-Dec-04 23-Dec-25 121.45000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1518 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1519 24-Dec-04 23-Dec-25 121.05000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1520 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1521 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1522 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1523 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1524 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1525 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1526 24-Dec-04 23-Dec-25 121.45000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1527 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1528 24-Dec-04 23-Dec-25 121.45000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1529 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1530 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1531 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1532 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1533 24-Dec-04 23-Dec-25 95.21500 HA $1,563 $7,400 St Ives – C052/2002 21 Years M15/1534 24-Dec-04 23-Dec-25 121.30000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1535 24-Dec-04 23-Dec-25 115.30000 HA $1,888 $8,584 St Ives – C052/2002 21 Years M15/1536 24-Dec-04 23-Dec-25 96.69500 HA $1,579 $7,400 St Ives – C052/2002 21 Years M15/1537 24-Dec-04 23-Dec-25 77.96000 HA $1,270 $7,400 St Ives – C052/2002 21 Years M15/1538 24-Dec-04 23-Dec-25 120.65000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1539 24-Dec-04 23-Dec-25 121.30000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1540 24-Dec-04 23-Dec-25 120.60000 HA $1,970 $8,954 St Ives – C052/2002 21 Years
P a g e 22 | 137 Number Grant date Expiry date Area Annual rent (US$) Min annual Expenditure (US$) Reporting Group Term Granted M15/1541 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1542 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1543 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1544 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1545 24-Dec-04 23-Dec-25 121.30000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1547 24-Dec-04 23-Dec-25 121.20000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1552 24-Dec-04 23-Dec-25 121.30000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1554 24-Dec-04 23-Dec-25 120.85000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1555 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1558 24-Dec-04 23-Dec-25 120.95000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1560 24-Dec-04 23-Dec-25 121.20000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1561 24-Dec-04 23-Dec-25 120.75000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1562 24-Dec-04 23-Dec-25 121.00000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1563 24-Dec-04 23-Dec-25 121.30000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1564 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1565 24-Dec-04 23-Dec-25 121.25000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1566 24-Dec-04 23-Dec-25 121.45000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1567 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1569 24-Dec-04 23-Dec-25 120.30000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1574 24-Dec-04 23-Dec-25 121.30000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1578 24-Dec-04 23-Dec-25 112.95000 HA $1,840 $8,362 St Ives – C052/2002 21 Years M15/1579 24-Dec-04 23-Dec-25 112.90000 HA $1,840 $8,362 St Ives – C052/2002 21 Years M15/1580 24-Dec-04 23-Dec-25 121.00000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1581 24-Dec-04 23-Dec-25 121.05000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1582 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1583 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1584 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1585 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1586 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1587 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1588 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1589 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1591 24-Dec-04 23-Dec-25 121.00000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1593 24-Dec-04 23-Dec-25 120.70000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1594 24-Dec-04 23-Dec-25 120.60000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1595 24-Dec-04 23-Dec-25 120.90000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1596 24-Dec-04 23-Dec-25 120.95000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1597 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1598 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1599 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1600 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1601 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1602 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1603 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1604 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1605 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1606 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1607 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1608 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1609 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1610 24-Dec-04 23-Dec-25 121.30000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1611 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1612 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1613 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1614 24-Dec-04 23-Dec-25 121.30000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1615 24-Dec-04 23-Dec-25 121.25000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1616 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1617 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1618 24-Dec-04 23-Dec-25 121.25000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1619 24-Dec-04 23-Dec-25 106.05000 HA $1,742 $7,918 St Ives – C052/2002 21 Years M15/1620 24-Dec-04 23-Dec-25 106.20000 HA $1,742 $7,918 St Ives – C052/2002 21 Years M15/1621 24-Dec-04 23-Dec-25 100.15000 HA $1,644 $7,474 St Ives – C052/2002 21 Years M15/1622 24-Dec-04 23-Dec-25 103.15000 HA $1,693 $7,696 St Ives – C052/2002 21 Years
P a g e 23 | 137 Number Grant date Expiry date Area Annual rent (US$) Min annual Expenditure (US$) Reporting Group Term Granted M15/1623 24-Dec-04 23-Dec-25 118.20000 HA $1,937 $8,806 St Ives – C052/2002 21 Years M15/1624 24-Dec-04 23-Dec-25 120.20000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1625 24-Dec-04 23-Dec-25 120.15000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1626 24-Dec-04 23-Dec-25 120.85000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1627 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1628 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1629 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1630 24-Dec-04 23-Dec-25 121.40000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1631 24-Dec-04 23-Dec-25 121.20000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1632 24-Dec-04 23-Dec-25 121.45000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1633 24-Dec-04 23-Dec-25 121.45000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1634 24-Dec-04 23-Dec-25 121.10000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1635 24-Dec-04 23-Dec-25 120.40000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1636 24-Dec-04 23-Dec-25 120.05000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1637 24-Dec-04 23-Dec-25 120.20000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1638 24-Dec-04 23-Dec-25 120.20000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1639 24-Dec-04 23-Dec-25 32.42500 HA $537 $7,400 St Ives – C052/2002 21 Years M15/1640 24-Dec-04 23-Dec-25 119.65000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1641 24-Dec-04 23-Dec-25 120.15000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1642 24-Dec-04 23-Dec-25 120.15000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1643 24-Dec-04 23-Dec-25 119.90000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1644 24-Dec-04 23-Dec-25 119.80000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1645 24-Dec-04 23-Dec-25 120.05000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1646 24-Dec-04 23-Dec-25 119.95000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1647 24-Dec-04 23-Dec-25 120.25000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1648 24-Dec-04 23-Dec-25 120.20000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1649 24-Dec-04 23-Dec-25 119.75000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1650 24-Dec-04 23-Dec-25 120.35000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1651 24-Dec-04 23-Dec-25 119.95000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1652 24-Dec-04 23-Dec-25 8.25950 HA $147 $7,400 St Ives – C052/2002 21 Years M15/1653 24-Dec-04 23-Dec-25 119.70000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1654 24-Dec-04 23-Dec-25 71.44500 HA $1,172 $7,400 St Ives – C052/2002 21 Years M15/1655 24-Dec-04 23-Dec-25 112.40000 HA $1,840 $8,362 St Ives – C052/2002 21 Years M15/1656 24-Dec-04 23-Dec-25 117.45000 HA $1,921 $8,732 St Ives – C052/2002 21 Years M15/1657 24-Dec-04 23-Dec-25 65.67500 HA $1,074 $7,400 St Ives – C052/2002 21 Years M15/1658 24-Dec-04 23-Dec-25 110.30000 HA $1,807 $8,214 St Ives – C052/2002 21 Years M15/1659 24-Dec-04 23-Dec-25 112.15000 HA $1,840 $8,362 St Ives – C052/2002 21 Years M15/1660 24-Dec-04 23-Dec-25 112.10000 HA $1,840 $8,362 St Ives – C052/2002 21 Years M15/1661 24-Dec-04 23-Dec-25 112.05000 HA $1,840 $8,362 St Ives – C052/2002 21 Years M15/1662 24-Dec-04 23-Dec-25 112.00000 HA $1,823 $8,288 St Ives – C052/2002 21 Years M15/1663 24-Dec-04 23-Dec-25 111.90000 HA $1,823 $8,288 St Ives – C052/2002 21 Years M15/1664 24-Dec-04 23-Dec-25 53.11000 HA $879 $7,400 St Ives – C052/2002 21 Years M15/1665 24-Dec-04 23-Dec-25 16.00000 HA $260 $7,400 St Ives – C052/2002 21 Years M15/1666 24-Dec-04 23-Dec-25 107.80000 HA $1,758 $7,992 St Ives – C052/2002 21 Years M15/1667 24-Dec-04 23-Dec-25 107.70000 HA $1,758 $7,992 St Ives – C052/2002 21 Years M15/1668 24-Dec-04 23-Dec-25 107.55000 HA $1,758 $7,992 St Ives – C052/2002 21 Years M15/1669 24-Dec-04 23-Dec-25 119.90000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1670 24-Dec-04 23-Dec-25 67.27000 HA $1,107 $7,400 St Ives – C052/2002 21 Years M15/1671 24-Dec-04 23-Dec-25 105.50000 HA $1,726 $7,844 St Ives – C052/2002 21 Years M15/1672 24-Dec-04 23-Dec-25 104.65000 HA $1,709 $7,770 St Ives – C052/2002 21 Years M15/1673 24-Dec-04 23-Dec-25 104.10000 HA $1,709 $7,770 St Ives – C052/2002 21 Years M15/1674 24-Dec-04 23-Dec-25 120.60000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1675 24-Dec-04 23-Dec-25 69.34500 HA $1,140 $7,400 St Ives – C052/2002 21 Years M15/1676 24-Dec-04 23-Dec-25 75.79000 HA $1,237 $7,400 St Ives – C052/2002 21 Years M15/1677 24-Dec-04 23-Dec-25 116.85000 HA $1,905 $8,658 St Ives – C052/2002 21 Years M15/1678 24-Dec-04 23-Dec-25 109.95000 HA $1,791 $8,140 St Ives – C052/2002 21 Years M15/1679 24-Dec-04 23-Dec-25 120.00000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1680 24-Dec-04 23-Dec-25 110.10000 HA $1,807 $8,214 St Ives – C052/2002 21 Years M15/1681 24-Dec-04 23-Dec-25 120.00000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1682 24-Dec-04 23-Dec-25 110.20000 HA $1,807 $8,214 St Ives – C052/2002 21 Years M15/1683 24-Dec-04 23-Dec-25 120.00000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1684 24-Dec-04 23-Dec-25 120.00000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1685 24-Dec-04 23-Dec-25 110.35000 HA $1,807 $8,214 St Ives – C052/2002 21 Years
P a g e 24 | 137 Number Grant date Expiry date Area Annual rent (US$) Min annual Expenditure (US$) Reporting Group Term Granted M15/1686 24-Dec-04 23-Dec-25 120.00000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1687 24-Dec-04 23-Dec-25 120.00000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1688 24-Dec-04 23-Dec-25 110.50000 HA $1,807 $8,214 St Ives – C052/2002 21 Years M15/1689 24-Dec-04 23-Dec-25 120.00000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1690 24-Dec-04 23-Dec-25 120.00000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1691 24-Dec-04 23-Dec-25 108.15000 HA $1,775 $8,066 St Ives – C052/2002 21 Years M15/1692 24-Dec-04 23-Dec-25 117.30000 HA $1,921 $8,732 St Ives – C052/2002 21 Years M15/1693 24-Dec-04 23-Dec-25 117.30000 HA $1,921 $8,732 St Ives – C052/2002 21 Years M15/1694 24-Dec-04 23-Dec-25 110.85000 HA $1,807 $8,214 St Ives – C052/2002 21 Years M15/1695 24-Dec-04 23-Dec-25 120.00000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1696 24-Dec-04 23-Dec-25 120.00000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1697 24-Dec-04 23-Dec-25 119.70000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1698 24-Dec-04 23-Dec-25 7.74200 HA $130 $7,400 St Ives – C052/2002 21 Years M15/1699 24-Dec-04 23-Dec-25 110.95000 HA $1,807 $8,214 St Ives – C052/2002 21 Years M15/1700 24-Dec-04 23-Dec-25 119.45000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1701 24-Dec-04 23-Dec-25 120.00000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1702 24-Dec-04 23-Dec-25 110.40000 HA $1,807 $8,214 St Ives – C052/2002 21 Years M15/1703 24-Dec-04 23-Dec-25 120.00000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1704 24-Dec-04 23-Dec-25 119.20000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1705 24-Dec-04 23-Dec-25 42.39000 HA $700 $7,400 St Ives – C052/2002 21 Years M15/1706 24-Dec-04 23-Dec-25 119.80000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1707 24-Dec-04 23-Dec-25 120.10000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1708 24-Dec-04 23-Dec-25 121.30000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1709 24-Dec-04 23-Dec-25 121.35000 HA $1,986 $9,028 St Ives – C052/2002 21 Years M15/1710 24-Dec-04 23-Dec-25 34.09500 HA $570 $7,400 St Ives – C052/2002 21 Years M15/1711 24-Dec-04 23-Dec-25 119.85000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1712 24-Dec-04 23-Dec-25 119.90000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1713 24-Dec-04 23-Dec-25 120.25000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1714 24-Dec-04 23-Dec-25 120.30000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1715 24-Dec-04 23-Dec-25 119.85000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1716 24-Dec-04 23-Dec-25 120.20000 HA $1,970 $8,954 St Ives – C052/2002 21 Years M15/1717 24-Dec-04 23-Dec-25 119.90000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1718 24-Dec-04 23-Dec-25 119.95000 HA $1,954 $8,880 St Ives – C052/2002 21 Years M15/1802 02-Nov-17 01-Nov-38 223.65000 HA $3,647 $16,576 St Ives – C052/2002 21 Years M15/206 10-Oct-86 09-Oct-28 617.55000 HA $10,061 $45,732 St Ives – C052/2002 21 Years (Renewed) M15/22 22-Feb-83 21-Feb-25 964.30000 HA $15,710 $71,410 St Ives – C052/2002 21 Years (Renewed) M15/230 27-Feb-87 26-Feb-29 118.75000 HA $1,937 $8,806 St Ives – C052/2002 21 Years (Renewed) M15/27 20-Apr-83 19-Apr-25 29.35000 HA $488 $7,400 St Ives – C052/2002 21 Years (Renewed) M15/28 20-Apr-83 19-Apr-25 88.60000 HA $1,449 $7,400 St Ives – C052/2002 21 Years (Renewed) M15/29 20-Apr-83 19-Apr-25 47.10000 HA $781 $7,400 St Ives – C052/2002 21 Years (Renewed) M15/300 29-May-92 28-May-34 777.55000 HA $12,666 $57,572 Kambalda West – C115/2013 21 Years (Renewed) M15/366 22-Apr-88 21-Apr-30 802.00000 HA $13,057 $59,348 St Ives – C052/2002 21 Years (Renewed) M15/367 22-Apr-88 21-Apr-30 839.65000 HA $13,675 $62,160 St Ives – C052/2002 21 Years (Renewed) M15/390 05-Oct-88 04-Oct-30 122.30000 HA $2,002 $9,102 St Ives – C052/2002 21 Years (Renewed) M15/432 24-Apr-89 23-Apr-31 580.90000 HA $9,459 $42,994 St Ives – C052/2002 21 Years (Renewed) M15/452 15-Aug-89 14-Aug-31 658.15000 HA $10,729 $48,766 St Ives – C052/2002 21 Years (Renewed) M15/453 15-Aug-89 14-Aug-31 865.55000 HA $14,098 $64,084 St Ives – C052/2002 21 Years (Renewed) M15/471 03-Aug-90 02-Aug-32 682.45000 HA $11,119 $50,542 St Ives – C052/2002 21 Years (Renewed) M15/472 03-Aug-90 02-Aug-32 683.45000 HA $11,136 $50,616 St Ives – C052/2002 21 Years (Renewed) M15/474 03-Aug-90 02-Aug-32 959.55000 HA $15,629 $71,040 St Ives – C052/2002 21 Years (Renewed) M15/475 03-Aug-90 02-Aug-32 959.95000 HA $15,629 $71,040 St Ives – C052/2002 21 Years (Renewed) M15/476 03-Aug-90 02-Aug-32 917.65000 HA $14,945 $67,932 St Ives – C052/2002 21 Years (Renewed) M15/493 22-Jan-90 21-Jan-32 832.80000 HA $0 $61,642 St Ives – C052/2002 21 Years (Renewed) M15/494 22-Jan-90 21-Jan-32 670.95000 HA $0 $49,654 St Ives – C052/2002 21 Years (Renewed) M15/495 22-Jan-90 21-Jan-32 944.75000 HA $0 $69,930 St Ives – C052/2002 21 Years (Renewed) M15/537 21-Sep-90 20-Sep-32 964.05000 HA $15,710 $71,410 St Ives – C052/2002 21 Years (Renewed) M15/538 21-Sep-90 20-Sep-32 725.15000 HA $11,819 $53,724 St Ives – C052/2002 21 Years (Renewed) M15/570 14-May-91 13-May-33 187.50000 HA $3,061 $13,912 St Ives – C052/2002 21 Years (Renewed) M15/575 12-Aug-92 11-Aug-34 8.40950 HA $147 $7,400 Kambalda West – C115/2013 21 Years (Renewed) M15/718 19-Sep-94 18-Sep-36 987.80000 HA $16,085 $73,112 Kambalda West – C115/2013 21 Years (Renewed) M15/719 19-Sep-94 18-Sep-36 768.15000 HA $12,519 $56,906 Kambalda West – C115/2013 21 Years (Renewed) M15/720 19-Aug-96 18-Aug-38 951.85000 HA $15,499 $70,448 Kambalda West – C115/2013 21 Years (Renewed) M15/759 03-Mar-95 02-Mar-37 488.50000 HA $7,961 $36,186 St Ives – C052/2002 21 Years (Renewed)
P a g e 25 | 137 Number Grant date Expiry date Area Annual rent (US$) Min annual Expenditure (US$) Reporting Group Term Granted M15/841 * 19-Aug-96 18-Aug-38 866.40000 HA $14,115 $64,158 Kambalda West – C115/2013 21 Years (Renewed) M15/842 * 19-Aug-96 18-Aug-38 983.85000 HA $16,020 $72,816 Kambalda West – C115/2013 21 Years (Renewed) M15/843 * 19-Aug-96 18-Aug-38 920.25000 HA $14,994 $68,154 Kambalda West – C115/2013 21 Years (Renewed) M15/882 06-Aug-04 05-Aug-25 881.90000 HA $14,359 $65,268 St Ives – C052/2002 21 Years M15/883 06-Aug-04 05-Aug-25 882.40000 HA $14,375 $65,342 St Ives – C052/2002 21 Years M15/884 01-May-98 30-Apr-40 912.15000 HA $14,864 $67,562 St Ives – C052/2002 21 Years (Renewed) M15/925 06-Aug-04 05-Aug-25 616.15000 HA $10,045 $45,658 St Ives – C052/2002 21 Years M26/514 06-Aug-04 05-Aug-25 854.00000 HA $13,903 $63,196 St Ives – C052/2002 21 Years M26/832 05-Nov-14 04-Nov-35 471.00000 HA $7,668 $34,854 St Ives – C052/2002 21 Years M26/842 18-Jul-18 17-Jul-39 377.55000 HA $6,154 $27,972 Lefroy West – C106/2018 21 Years Mining Leases ML15/141 01-Jan-67 31-Dec-29 121.40000 HA $1,986 $9,028 St Ives – C052/2002 ML15/142 01-Jan-67 31-Dec-29 121.35000 HA $1,986 $9,028 St Ives – C052/2002 ML15/151 01-Jan-66 31-Dec-28 121.40000 HA $1,986 $9,028 St Ives – C052/2002 Prospecting Licences P26/3764 15-Mar-11 14-Mar-19 71.80000 HA $176 $2,131 Lefroy West – C106/2018 4 Years (Extended) P26/3765 15-Mar-11 14-Mar-19 133.00000 HA $325 $3,937 Lefroy West – C106/2018 4 Years (Extended) P26/3889 11-Jun-13 10-Jun-21 199.00000 HA $486 $5,890 Lefroy West – C106/2018 4 Years (Extended) P26/3890 11-Jun-13 10-Jun-21 200.00000 HA $488 $5,920 Lefroy West – C106/2018 4 Years (Extended) P26/3891 11-Jun-13 10-Jun-21 195.00000 HA $476 $5,772 Lefroy West – C106/2018 4 Years (Extended) Note: * These tenement have Applications for Forfeiture lodged against them by a third party. a) Registered Holder - St Ives Gold Mining Company Pty Limited. b) The Qualified persons opinion is that licenses and tenements can be renewed or extended as required. Source: St Ives CPR, 2021 SIGMC maintains a tenement management auditing system that flags lease renewals to meet the renewal process timeline and to keep the tenement ownership in good standing by meeting expenditure and other commitments. Two expired in 2019 (P). Four expired in 2021 (one E and three P). 23 are due to expire in 2022. 3.4 Mineral rights description The operation of mining and associated activities at St Ives are governed by numerous Western Australian Government Acts. This section summarises published information available from the Western Australian Department of Mines, Industry Regulation and Safety (DMIRS). The Western Australian Mining Act 1978 (WA) (the Mining Act (1978)) is the principal legislation governing exploration and mining on land in Western Australia. Licenses and leases for, among other things, prospecting, exploration and mining must be obtained pursuant to the requirements of the Mining Act (1978) before the relevant activity can begin. Application fees and annual rental payments are payable in respect of each tenement. Where Native Title has not been extinguished, Native Title legislation may apply to the grant of tenure and some subsequent administrative processes. Heritage legislation may operate to preclude or regulate the disturbance of a particular area. Prospecting licences are granted over a maximum area of 200 ha and have an initial period of four years and can be extended by one period of four years. Exploration Licences are granted for five years plus a possible extension of five years and further periods of two years thereafter with 40 % per cent of ground to be surrendered at the end of year six. If the holder of a Prospecting or Exploration Licence establishes indications of an economic mineral deposit and expends a minimum level of investment, it may apply for a Mining Lease which gives the holder exclusive mining rights with respect to all minerals on the property. It is possible for one party to own the surface of the property and for another to own the mineral rights.
P a g e 26 | 137 An application for a Mining Lease must be accompanied by one of the following: A Mining Proposal completed in accordance with the guidelines. A statement of mining operations and a mineralisation report prepared by a Qualified person. A statement of mining operations and a resource report that complies with the JORC Code that has been made to the Australian Securities Exchange (ASX). The maximum initial term of a Mining Lease is 21 years, and the holder has the right to renew the lease for a further period of 21 years. Subsequent renewals are subject to the minister’s discretion and the lease can only be assigned with the consent of the relevant minister. Prescribed minimum annual expenditure commitments and activity reporting requirements apply to holders of Exploration and Prospecting Licences and Mining Leases. Miscellaneous Licences are granted for purposes such as a roads and pipelines. Mining operations on tenements in Western Australia must be developed and operated in compliance with various Commonwealth and State legislative requirements. The operation of St Ives is under the control of the following Western Australian Government legislation. Mining Act (1978). Environmental Protection Act (1986) and Environmental Protection Amendment Act (2004). Contaminated Sites Act (2003). Environmental Protection (Clearing of Native Vegetation) Regulations (2004). Rights in Water and Irrigation Act (1914). Conservation and Land Management Act (1984). Wildlife Conservation Act (1950). Country Areas Water Supply Act (1947). Aboriginal Heritage Act (1972). Heritage of Western Australia Act (1990). Environmental Protection Regulations (1987). Environmental Protection (Unauthorised Discharge) Regulations (2004). Mining Rehabilitation Fund Act (2012). The operation of St Ives is also under the authority of the following Commonwealth of Australia Government legislation: Environmental Protection and Biodiversity Conservation Act (1999). National Greenhouse and Energy Reporting Act (2007). The governing Western Australian agencies are the Department of Water and Environmental Regulation (DWER), the Department of Planning, Lands and Heritage (DPLH) and the DMIRS. Mineral royalty rates are prescribed under the Mining Regulations 1981. For gold, an ad valorem royalty rate of 2.5 % is applied. St Ives also holds regulatory licences and registrations that govern various aspects of environmental management as disclosed in Section 17.
P a g e 27 | 137 3.5 Encumbrances Other regulatory requirements including those associated with the operation and management of mining, rehabilitation and exploration activities are managed under the Mining Act (1978) in the form of tenement conditions administered by the Western Australian Department of Mines, Industry Regulation and Safety DMIRS. Section 17 discloses the remediation and reclamation guarantees that are pertinent to St Ives. The Tenements Officer in Perth Office provides St Ives with current tenement spend and estimate of underspend on exploration tenements highlighting ones at risk, and exploration have to incorporate this spend into the exploration plan for the coming 6 to 12 months where possible. SIGMC has received fines on two tenements a total of $9,600 during 2021 that had not been worked on in the previous year and were underspent with regards to their commitment. Heritage restrictions and land access have been the primary reasons for this lack of work. During 2021 one of the tenements received a geophysical survey to accumulate costs and also provide a foundational dataset for further exploration while the other is planned to have initial exploration drilling in 2022 following heritage and flora surveys clearance. Seven licences have applications for forfeiture by a third party against them in the Kambalda West area due to lack of expenditure on the tenement package since mining and rehabilitation was completed at the Cave Rocks Mine. If applications for forfeiture are successful, then St Ives would lose these tenements. No declared resources or reserves are on these tenements. 3.6 Other significant factors and risks There are no other significant factors and risks that may affect access, title, or the right or ability to perform work on the Property and therefore execute the life of mine plan If mine expansions are required into areas currently held under an Exploration Licence, conversion to a Mining Lease is required prior to the commencing mining. This may also trigger negotiations under the Native Title Act with relevant Traditional Owners, which must be undertaken prior to grant of tenure. Aboriginal cultural heritage consultation, surveys and approvals are required for most mining and exploration activities, which requires engagement with relevant Traditional Owners. In most cases, agreements exist to facilitate this process. The permitting and licensing requirements required to start a new mining operation (or to expand or modify existing operations) may include local disturbance, clearing, environmental, power, water extraction and waste disposal, which follow well established authorisation protocols with the relevant government authorities. In 2014, the Ngadju People were successful in having their claim under the Native Title Act 1993 (Cth) (WAD6020/1998) determined by the Federal Court over an area including part of the St Ives property. SIGMC has not been required to undertake the ‘right to negotiate’ process with the Ngadju People with respect to its tenure. In 2019, a Native Title claim by the Marlinyu Ghoorlie People (WAD647/2017) was registered. This claim also covers part of the St Ives party. St Ives is currently engaged in early discussions with the Marlinyu Ghoorlie People under the ‘right to negotiate’ process with respect to certain exploration tenure. Other permitting and licensing requirements required to start a new mining operation may include inter alia, heritage, local disturbance, clearing, environmental, power, water extraction and waste disposal, which follow well established authorisation protocols with the relevant government authorities. The Qualified persons are not aware of any other current or pending legal matters that may have an influence on the rights to explore or mine for minerals at St Ives. The Qualified person has relied on information provided by the Registrant and company technical experts in preparing its findings and conclusions regarding other significant factors and risks.
P a g e 28 | 137 A review of recent Company public disclosure documents including the annual report (Form 20-F for the 12 months Ended 31 December 2021) do not contain any statements by the directors on any legal proceedings or other material conditions (other than as set out above) that may impact on the Company’s ability to continue mining or exploration activities at St Ives. In consideration of all legal aspects, the following statements are correct as at 31 December 2021: there are no legal proceedings that may have an influence on the rights to explore for minerals. the legal ownership of all mineral and surface rights has been verified. no significant legal issue exists which would have an effect on the likely viability of a project and/or on the estimation and classification of the Mineral resources and reserves as reported herein. 3.7 Royalties or similar interest Third-party royalties apply to some mining leases, including M15/495, which covers the Incredible project. This 3 % production royalty is owned by Deterra Royalties (ASX : DRR). SIGMC has a sub-lease agreement with the Beta Hunt Gold Mine owned by Karora Resources Inc (TSX: KRR) that in the northern part of the Central Corridor. The Qualified person has reviewed the limited non-managed tenements and is of the opinion that it has not been explored on in 2021. Any discoveries will be considered as attributable to Gold Fields.
P a g e 29 | 137 4 Accessibility, climate, local resources, infrastructure and physiography 4.1 Topography, elevation, and vegetation The SIGMC tenure is located within the Eastern Goldfields Province in the Archaean Yilgarn Craton of Western Australia (Witt 1993). The regional topography is gently undulating with occasional ranges of low hills (generally less than 410 m ASL) with minor drainage channels feeding extensive salt lakes (Lake Lefroy) at approximately 286 m ASL. Soils are principally brown calcareous earths and are poorly developed over the gold-bearing greenstone belts (Beard 1990). Saline and subsaline soils are common adjacent to drainage channels and salinas. Groundwater salinity in the region is generally in the range of 50,000 to greater than 300,000 mg/L Total Dissolved Solids (TDS). Vegetation within the project area consists of mallee and acacia thickets with shrub-heaths on sandplains. Dwarf shrublands of samphires persist on salt lakes, surrounded by diverse Eucalyptus woodlands, which also occur on ranges and in valleys. The Qualified person’s opinion is that the revegetation proposed will adequately remediate any disturbance to the satisfaction of the community and authorities and the revegetation of tailings Facilities will be in line with Company procedures and will minimise toxins. 4.2 Access Access to St Ives is via a sealed road 20 km from the Goldfields Highway, which links the town of Kambalda with Kalgoorlie to the north (Figure 3.1.1). 4.3 Climate The Eastern Goldfields bioregion is characterised by a semi-arid climate with hot summers and mild winters, often described as a Mediterranean climate. The mean maximum temperature for City of Kalgoorlie-Boulder (CKB) ranges between 33.6ºC in January and 16.7ºC in July, as recorded at the Bureau of Meteorology (BOM 2017) Kalgoorlie- Boulder Airport weather station (BOM Station 012038). The region experiences a semi-arid climate, with 266.8 mm of rainfall received on average. The BOM 78 year rainfall record indicates that the highest daily rainfall recorded to-date is 177.8 mm (BOM 2017). February is the wettest month with 31.1 mm on average received, although rainfall patterns can be quite variable. Remnant tropical cyclones and thunderstorms associated with cyclonic activities in the North of the WA can occasionally bring heavy rains and result in flooding in the summer period. Annual evaporation rates of 2400-2800 mm/year exceed rainfall and are the highest during the summer months when humidity is the lowest. Heavy rains occasionally cause localised flooding but surface water bodies typically remain only for short periods of time after rainfall. No extreme climate conditions are experienced that materially affect operations. 4.4 Infrastructure St Ives currently comprises one open pit (Neptune) and two underground (Invincible South and Hamlet North) mining operations with associated infrastructure and facilities that operate year-round. Major infrastructure owned and operated by SIGMC includes a 4.7 Mt/a carbon in pulp (CIP) processing facility, an in-pit tailings storage facility (TSF), haul roads and a centralised administration centre and engineering workshops (Figure 3.1.1). Other significant facilities include: Reagent storage and mixing facilities. Process laboratory. Process maintenance and warehouse facilities. Electrical infrastructure.
P a g e 30 | 137 Fuel storage. Raw water tanks and reverse osmosis water treatment system. Process water storage pond. Borefields. Paste Plants at Invincible and Hamlet. Supplies are delivered to site via road transport from either Kalgoorlie or Perth via the Goldfields Highway. The St Ives workforce are a mix of residential employees residing predominantly in Kambalda and Kalgoorlie and fly- in fly-out (FIFO) from Perth. A mix of work rosters are in use with operational rosters predominantly based on 8 days on, 6 days off cycles and support service roles being 5 days on 2 days off; however, some contractors operate on longer rosters such as 2 weeks on, 1 week off. Further details regarding the infrastructure are provided in Section 15. The closest population centre is the town of Kambalda with approximately 2,500 people. The town was established in 1970 as a dormitory town predominantly for workers at the nearby nickel mines. Facilities include a supermarket, post office, service station, primary school, tavern and various sporting facilities. 4.5 Book Value The economic analysis disclosed in Chapter 19 is in respect of attributable Mineral reserves only and excludes Mineral resources and lower grade material. The assumptions, parameters and cashflows are only intended to support the reserve declaration of the operation. Certain assumptions and estimates might differ from the long-term outlook or actual results of the operation, including the commodity prices used, which are materially different from current spot prices. Changes in these assumptions may result in significant changes to mine plans, models and the NPV of the operation. The Mineral reserves will therefore not necessarily represent the total future economic benefit that can be derived from the Property. Net Book value of property plant and equipment consists mainly out of land, mining infrastructure, mine development, mineral and surface rights and processing plant related assets of the Property. St Ives has a book value of $266.6. The Qualified person is of the opinion that the book value estimated as described is expected to be different to the NPV for the attributable reserve only.
P a g e 31 | 137 5 History Gold was discovered at the Kambalda Red Hill Camp in 1897 and, in the following decades, other gold-bearing locations including Victory and Ives Reward were discovered and mined. In 1966, nickel sulphide mineralisation was discovered near the old Red Hill mine. Western Mining Corporation Limited (WMC) developed a mining and milling operation and between 1966 and 1996 mined approximately 34.0 Mt of ore at an average grade of 3.1 % Ni from the region. An increase in the gold price during the 1970s led to a re-evaluation of the old gold prospects in the Kambalda area. In 1980, significant gold mineralisation was identified beneath the Hunt nickel shoot. In 1981, the Victory-Defiance complex (Leviathan area) was discovered. Gold production commenced at St Ives using a 0.5 Mt/a treatment plant (later expanded to 1.2 Mt/a) located at the Kambalda Nickel Concentrator site. In 1988, a new 3.1 Mt/a carbon-in-leach (CIL) facility was constructed at St Ives, 25 km south of Kambalda. During 2001, a 2 Mt/a heap leach facility was commissioned during the period when Gold Fields acquired St Ives from WMC in 2001. In 2004, the currently operating 4.7 Mt/a Lefroy processing facility was constructed and commissioned in early 2005. Gold Fields commenced an aggressive exploration program in 2006 with several economic deposits discovered and mined between 2007 and 2012. These include Cave Rocks (2007), Belleisle (2007), Hamlet (2009) and Athena (2010). Ongoing exploration delivered the Invincible camp in 2013, which remains the mainstay of mine production. First production from Invincible started in 2015. In 2017, development commenced into the Invincible underground deposit with full production reached in 2018. Development of the access decline to the Invincible South underground deposit commenced in 2018 and level development was commenced in 2019. Production from the Neptune paleochannel open pit commenced in 2013 and will continue through 2021. During 2020, ongoing exploration saw the Invincible camp continue to grow and it remains a key focus area for exploration and resource extension drilling. Work continues at Invincible Underground, Invincible South, Invincible Deeps and Invincible South Extensions to assess the full potential of this major underground camp and maintain momentum on defining resource extensions and converting Mineral resources to Mineral reserves. The Qualified person is of the opinion that the historic exploration results have been superseded and supplemented by more recent exploration undertaken by Gold Fields for areas of current interest and that any historic errors or deficiencies will have little influence on the current Mineral resource models or the life of mine reserves.
P a g e 32 | 137 6 Geological setting, mineralisation, and deposit 6.1 Geological setting The St Ives property lies within the Kambalda Domain (Figure 6.1.1), a subset of the Norseman-Wiluna Greenstone Belt of the Archean Yilgarn Craton, a 2.7 Ga granite-greenstone terrane in southern Western Australia. The Kambalda Domain is bound by the north-northwest trending Boulder-Lefroy Fault and Zuleika Shear. The region has undergone four compressional events predated by early extension and is metamorphosed to upper greenschist or lower amphibolite facies. Figure 6.1.1: St Ives – regional geology Source: St Ives CPR, 2021
P a g e 33 | 137 Most of the known gold deposits are proximal to the axial plane of the gently south-plunging Kambalda Anticline, which extends 35 km from the southern end of the Kambalda Dome to the Junction mine. The stratigraphic succession in the Kambalda Domain comprises Kalgoorlie Group volcanic rocks and the Black Flag Group felsic volcanic and sedimentary rocks overlain by sedimentary units of the post-tectonic Merougil Beds. A major second order structure known as the Playa Shear splays off the Boulder-Lefroy Fault and strikes through the St Ives property for more than 10 km. Most of the gold orebodies at St Ives are associated with third order splays off the Playa Shear. Notable exceptions are Invincible, Argo and Santa Ana situated on the western limb of the Kambalda Anticline. Mineralisation typically occurs where these structures intersect favourable rock units with chemical or rheological contrasts combining with structural flexures to form the most important local controls to gold mineralisation. At least 80 individual deposits have been mined in the St Ives area to date. Ore-hosting structures in deposits such as Greater Revenge, North Orchin, Argo and much of the Victory area are predominantly north-south striking, moderately to gently east-dipping or west-dipping reverse faults and shear zones with maximum displacements of a few tens of metres. Strike lengths of ore-hosting structures are seldom more than 1 km. The orientation of stretching lineations, curvature of shear zone foliations, associated gently dipping extension veins and stratigraphic separations indicate a reverse slip sense for most ore-hosting structures, especially in the Argo/Victory/Revenge area. The most common host rock is dolerite, such as the Defiance, Condenser and Junction Dolerites. Granophyric dolerite and Kapai Slate tend to host the highest-grade gold mineralisation. The Paringa Basalt and Kambalda Komatiite host deposits in discrete shear structures that are moderate in both tonnage and grade. Low to moderate grade, high tonnage mineralisation is commonly developed in porphyries, which are found in almost all deposits. A stratigraphic section is shown in Figure 6.1.2 and a description of stratigraphy in Table 6.1.1. Table 6.1.1: Description of stratigraphy Sequence Unit Description Merougil Formation Merougil Creek Beds The Merougil Formation is divided into the Early and Late Merougil Group. At St Ives only the Early Merougil Group is present. The Early Merougil Group is dominated by well-sorted quartz-rich sandstone that ranges from massive graded, planar stratified to trough corss-bedded in texture. Polymictic conglomerate beds can also be found, located with increasing abundance towards the unit’s base (Squire et al, 2010). Kalgoorlie Sequence Junction and Condenser Dolerites Both the Junction Dolerite and Condenser Dolerite are layered intrusions in the lower part of the Black Flag Group and are considered to be correlatives to the Golden Mile Dolerite (Blewett et al, 2010). Black Flag Group The Black Flag Group of felsic volcano-sedimentary rocks is divided into the Late and Early Black Flag Group (Squire et al, 2010). The Early Black Flag Group consists of massive graded to moderately stratified feldspar-rich sandstones, siltstone, felsic cobble conglomerate and polymictic volcanic breccias and rare mudstone (McGoldrick et al, 2013). The Late Black Flag Group at St Ives consists of quartzo-feldspathic sandstone, polymictic conglomerate and interbedded mudstone- siltstone (McGoldrick et al, 2013). Kambalda Sequence Paringa Basalt The Paringa Basalt consists of a 500 to 1500 m thick, variolitic pillow-basalt flows intruded at the base by the differentiated Defiance Dolerite. Laminated interflow chert-rich sedimentary rocks are more common towards the base. It is separated into a low MgO tholeiitic upper unit and high MgO komatiitic lower unit. Kapai Slate The Kapai Slate is a distinctive stratigraphic marker separating the Devon Consols Basalt (below) from the Paringa Basalt (above). It is a black sulphidic to siliceous mudstone less than 10 m thick. Devon Consols Basalt The Devon Consols Basalt is a pillowed to massive, variolitic series of lava flows. The lower contact with the Kambalda Komatiite is interfingered and locally sharp. Thickness varies from 60-100 m thick to greater than 150 m thick in the Revenge area. There are thin differentiated dolerites within the Devon Consols Basalt that are fine-grained basalt in the upper part, and coarse grained gabbroic in the lower zones. Kambalda Komatite The Kambalda Komatiite is separated into the lower nickel-sulphide hosting Silver Lake Peridotite, which conformable overlies the Lunnon Basalt and the upper Tripod Hill Komatiite. The Kambalda Komatiite has been extensively hydrothermally altered, and then altered to talc-dominant mineral assemblages during CO2 metasomatism. Spinifex textures are typically preserved and cumulate textures are typically destroyed. Lunnon Basalt The tholeiitic (5-9 % MgO) Lunnon Basalt is a series of 2 to 30 m thick pillowed and massive lava flows, with sparse interflow sedimentary units. Work at the Kambalda Dome indicates thickness of at least 2 km, seismic modelling indicates a thickness greater than 5 km. Source: St Ives CPR, 2021
P a g e 34 | 137 Figure 6.1.2: Stratigraphic section through St Ives showing gold deposit positions Source: St Ives CPR, 2021
P a g e 35 | 137 Multiple phases of deformation are recorded during and post regional metamorphism with the domain crossed by a network of variably striking and dipping first, second, third and fourth-order shears, faults and thrusts that control the location of the gold mineralisation. In many deposits, ductile shearing is punctuated by repeated brittle slip events, which produced breccias and shear veins especially in jogs and dilatant bends in shear zones. Hydrothermal alteration and spatially related gold mineralisation are synchronous with deformation along the ore- hosting network of shear zones. The alteration is concentrated in 10 cm to 300 m wide halos around shear zones, mesoscopic fractures, and veinlets, and is texturally destructive. Gold is invariably associated with well-formed pyrite or, as at Junction, granular pyrrhotite. 6.2 Mineralisation There are four main styles of gold mineralisation at St Ives. Individual deposits may contain more than one style depending on the local structural and lithological conditions: Lode mineralisation: typically consists of a 0.5 cm to 50 cm wide cataclasite core surrounded by 0.1 cm to 3.0 m of foliated cataclasite. Quartz vein stockworks: irregular bodies of closely spaced and regularly oriented quartz veins. Composite style: variably developed quartz vein stockwork mineralisation localised in and around lode shear zones. Supergene: broad zones of flat-lying gold mineralisation hosted in deeply weathered Archean and overlying Tertiary rocks. The current major production centres at St Ives are the Invincible deposits, the Neptune paleochannel and underlying lodes and the Hamlet deposit. 6.2.1 Invincible Invincible is situated on Lake Lefroy, approximately 8 km northwest of the Lefroy process plant. The Invincible camp is dominated by a 2 km long open pit mined between 2014 and 2019, with mineralisation extending a further 1.9 km to the south of the pit (Invincible South) and >800 m depth (Invincible Deeps). There are three major lithofacies identified at the Invincible Camp (Figure 6.2.1): The Black Flags Andesite (BFA): This unit forms the footwall sequence at Invincible and consists of volcanic quartz-rich sandstone with lenses of polymictic sub-rounded to sub angular pebble to cobble conglomerate. The Black Flags Mudstone (BFM): Is the main unit to the host mineralisation at Invincible and is comprised of fissile massive to laminated grey mudstone, planar laminated to thinly interbedded siltstone with graded beds and massive to diffusely laminated medium interbedded siltstone. The BFM is approximately 110 m thick at depth and narrows to around 50 m near the surface. The Merougil Group (MER): This unit form the tops of the Invincible sequence (hanging wall) and comprises medium to coarse grained quartz-rich sandstones, pebble to boulder polymictic conglomerates and very rare siltstone to mudstone There are two main styles of mineralisation within the Invincible Camp: (Type 1) BFM hosted shear veins and breccias, with albite-pyrite alteration, directly related to the high-grade mineralisation and (Type 2) Footwall BFA hosted extensional veins and stockwork veining alteration selvages of medium to strong hematite ± albite ±sericite alteration. Veins range in width from a few centimetres to two meters with visible gold is common in these veins. Two prominent shear zones are associated with the Invincible deposit: the Merougil shear and the Morgan Island shear. These structures exploit the both the hangingwall and footwall contacts and are not themselves mineralised but are thought to be conduits for the mineralisation.
P a g e 36 | 137 Figure 6.2.1: Cross section showing the Geology at the Invincible Mine Source: St Ives CPR, 2021 6.2.2 Neptune The Neptune deposit consists of three main mineralisation styles: paleochannel, supergene and fresh lode material with the deposit located beneath Lake Lefroy with post mineralisation sedimentary cover to depths of 30 m to 60 m (Figure 6.2.2). The majority of mineralisation mined at Neptune comes from paleochannel gold deposited within a main east-west channel, minor tributaries and paleo-slope sheetwash as free gold nuggets and gold entrained in quartz that is post Archean in age. Supergene mineralisation is derived from a combination of gold mobilised from the underlying fresh lode structures and from overlying paleochannel material (Figure 6.2.2). Archean lode structures within the Neptune Open Pit include the more significant N01 structure trend roughly north- south and generally dip moderately to the east and have been mined in the Stage 5 Pit at Neptune. In Stage 7 Neptune mineralised structures dip away to the west at a shallow trend with a north-south strike. Lodes are characterised by a pyrite + quartz + carbonate + gold assemblage. Host rocks vary with mineralisation at Neptune encountered in the
P a g e 37 | 137 lower Kambalda sequence geology (Defiance Dolerite, Devon Consols Basalt, Kapai Slate and various intrusives) (Figure 6.2.3). Figure 6.2.2: Paleochannel schematic showing the geology at St Ives Source: St Ives CPR, 2021 Figure 6.2.3: Long Section showing geology at the Neptune open pit Source: St Ives CPR, 2021
P a g e 38 | 137 6.2.3 Hamlet North The Hamlet North deposit is located to the north of the historically mined Hamlet deposit and was discovered in 2018. It is a ~150 m in strike and 5-10 m wide orebody with a down plunge extent of >750 m located on the Hamlet Shear. The Hamlet Shear is a north-south trending reverse slip shear zone. Mineralisation occurs within the Defiance Dolerite Unit 4, a granophyric unit within the Defiance Dolerite (Figure 6.2.4). Gold mineralisation is associated with a biotite alteration halo hosting quartz-albite and quartz-carbonate veins. The high-grade zone comprises breccia zones (pods) and vein or stockwork vein arrays. The shallow to moderate dipping veins a widely spaced, generally discontinuous and form part of the halo mineralisation. A series of felsic and intermediate intrusive units occur within Hamlet North, although these are not volumetrically significant in the ore zone. Figure 6.2.4: Long Section showing geology at the Hamlet Mine Source: St Ives CPR, 2021
P a g e 39 | 137 7 Exploration Near-mine (brownfields) exploration is key to Gold Fields’ strategy as it offers one of the lowest-cost opportunities for adding ounces and growing cash- flow, particularly on a per share basis. The value in near-mine exploration lies in: Knowledge of the ore bodies, which enables our exploration teams to identify extensions or additional ore sources housed within the mining tenement. Operational capabilities, including Gold Fields’ proven ability to develop and mine orogenic ore bodies. Regional and operational infrastructure, including existing processing plants and regional management teams. Gold Fields believe that brownfields exploration provides a robust platform for regional growth. In addition to growing Gold Fields’ Mineral resource and Mineral reserve base, near-mine exploration also extends the life of the Group’s existing assets and ensures that each region can continue leveraging its infrastructure. St Ives spent $26.4 m on near- mine exploration during 2021, drilling 114,330 m. The mine’s Mineral reserves decreased by 9 % to 2.4 Moz and Mineral resources declined by 2 % to 4.9 Moz. In 2021, extensional exploration targeted additions to the Invincible, Neptune and Hamlet complexes with significant growth in both Resources and Reserves in the Invincible complex. 7.1 Exploration Exploration at St Ives is classified as either extensional (resource definition) or additional (early stage) exploring for a new orebody or testing for extensions on existing orebodies based on Gold Fields exploration procedures. St Ives exploration budget over the last 3 years has been over +$24 M invested annually. The 2022 exploration budget is $26.5 M. Site exploration strategy following corporate direction is geared to replace reserves and resources annually through drilling by allocation of roughly 50 % of the exploration budget to extensional drill programs. Exploration programs were completed around the active mining complexes at Invincible, Neptune and Hamlet North during 2021. This drilling was largely successful with significant mineral inventory increases at the Invincible Complex and Hamlet. Additional drill programs were also completed in 2021 testing for extensions of existing mineralisation around the main mining complexes of Invincible, Hamlet and Neptune and will continue during 2022 as they continue to show continued potential for the expansion of the economic mineral inventory. Additional exploration at St Ives invests significantly in the search for new deposits focussing on the collection of foundational geochemical datasets for gold and multi-elements using full field Air Core (regular 400 x 400 spaced drilling) across the tenement package. On regional tenements the focus is looking for large Open Pit targets that support the St Ives LoM and corporate strategy. Full field Aircore drilling in 2021 was completed in the Western Basins area and commenced on the land area of the LEX Joint Venture. Testing of follow up exploration targets during 2021 occurred in the Western Basins, Lex Joint Venture and Kambalda West areas using primarily RC and Diamond drilling. Exploration strategy over the last few years has also pivoted to restart exploring the Central Corridor area of St Ives (13 million ounces mined historically from the Victory, Revenge, Athena, Argo, Hamlet and Junction areas) for underground targets with initial drilling completed in 2020-2021 at Neptune and around the Hamlet Complex. Drill testing is based on the completion of detailed geological and targeting models over the last few years that have allowed for the ranking of exploration targets for priority follow up based on their geological prospectively. This work is reviewed by corporate and technical specialists offsite to ensure the highest prospective targets are tested. Follow up work is planned in 2022. Auger based geochemical programs have also been completed across large areas of the St Ives tenement package from 2018-2020. These programmes enable the sampling of the calcrete soil horizon for gold identifying coherent geochemical anomalies. St Ives also completes regularly geophysical surveys including gravity, and magnetics. Foundational gravity geophysical datasets were collected in on regional tenements.
P a g e 40 | 137 The location of the material exploration programs undertaken on the Property during the period 1 January 2021 to 31 December 2021 are shown in Figure 7.1.1. Figure 7.1.1: Location of exploration areas Source: St Ives CPR, 2021 In underground mines face chip and wall chip samples are routinely collected. The face samples are collected from development faces approximately 3.5 m apart using a jumbo drill rig rattling the extent of the exposed face in approximate 1 m segments. The resulting sample is considered representative of the face. Most faces are mapped by a geologist and where the geometry or geology predicates, wall samples may also be collected. Faces that have had sampling under geological supervision maybe included in the resource estimation if QAQC criteria is met. The Qualified person’s opinion of the 2021 exploration programs and results is: a) All procedures and parameters applied to the surveys and investigations are appropriate for the style of mineralisation being prospected. b) The exploration programs have confirmed continuity of geology and controls on gold mineralisation in key areas.
P a g e 41 | 137 c) There were no material variations encountered during the 2021 exploration programs. d) Based on the 2021 exploration and results a 2022 exploration budget has been approved to retain traction on the programs and to progress leading projects. 7.2 Drilling 7.2.1 Type and extent Drilling at St Ives uses a number of different drilling processes based on the type of sample required. Drill testing during 2021 was split between resource definition (extensional) drill programs predominately around the active mining complexes at Invincible, Neptune and Hamlet and early stage (additional) drilling, searching for new deposits and extending existing programs. The Qualified person’s opinion is that a register of individual drill results would be too voluminous, potentially misleading and not relevant to the current reporting of Mineral resources and Mineral reserves. A summary of the surface exploration drilling physicals for 2021 is shown in Table 7.2.1. Table 7.2.1: Summary of St Ives drilling – 2021 Area Hole type (m) AC RC DD Invincible 8,938 48,595 Hamlet North 15,278 Neptune 3,967 3,719 Kambalda West 1,140 Western Basin 4,444 4,868 Lex JV 9,249 5,742 1,884 Central Corridor 3,426 2,043 Total 13,693 28,081 71,519 Note: a) Infill exploration is reported separately from exploration. Source: St Ives CPR, 2021 DD and RC are the main drilling techniques used to produce data for Mineral resource estimation with Ausdrill the current drilling contractor. In the case of the paleochannel deposits, whole sample AC drilling data is used. Sonic core drilling of the paleochannel and unconsolidated material was used historically. This technique provided a more representative in-situ sample of unconsolidated material. Surface DD holes are predominantly drilled using an HQ (96 mm) drill bit before transitioning to a smaller NQ (75.7 mm) bit. Underground mine definition and grade control DD holes are NQ size whilst grade control upholes are LTK60 in diameter. Historically, underground drilling included LTK48 DD holes. Open pit Mineral resources are predominantly defined by 5½ inch diameter RC drillholes supported by spatially representative DD holes to aid with the geological interpretation and validate the RC drilling results. Drill spacing within the open pits varies from 5 m x 10 m, 10 m x 10 m, 10 m x 20 m and 20 m x 20 m. This spacing is dependent on the orebody geometry, the stage of the project and mining method. AC drillhole results are generally excluded from all Mineral resource estimates. In some earlier instances these results were used for inferred Mineral resource estimates and were superseded by more representative RC or sonic holes. The exception is for paleochannel deposits where AC holes tend to represent the less consolidated material better than RC or DD holes. Limited drillhole data is used from non-SIGMC sources. Where external information is used, it is appropriately flagged with standard validation checks applied when imported into the St Ives database.
P a g e 42 | 137 7.2.2 Procedures Survey All drillholes are initially set out using either a GPS or DGPS depending on the required accuracy of the drill collar. Drill rigs are aligned either with a digital instrument (AziAligner) or using marker pegs and flagging tape. When drilling is complete, all DD and RC collars to be used for resource estimation are re-surveyed using a DGPS and their final location is verified in the database. All drillholes used for resource estimation (except AC holes) have downhole surveys undertaken using either Reflex EMS (9 m intervals), multi-shot camera (18 m intervals), Eastman single-shot camera (30 m intervals) or downhole gyroscopic (18 m intervals) surveys. These surveys are validated for any potential errors and uploaded into the database. All captured survey data is stored in a Datashed® database. Codes are stored that indicate the status of collar and downhole surveys. The project geologist is required to interpret the results of the downhole survey methods and compare the surveyed collar location against the planned collar position. Sample collection Sample collection procedures for the different hole types are: Diamond drill core is delivered by the drilling contractor to the core farm where it is cleaned of dirt and grease, laid out on the roller racks, measured and logged. Samples of the core are determined by the geologist and can vary in length from between 0.3 and 1.0 m with a maximum core length generally no longer than 1 m. The core is cut along its length by automated cutting saws (orientation line used as a guide for the cut line) and sampled by field staff at the core farm. The core without markings (meter marking or sampling marks) is chosen for sampling. In most instances, half core is collected for assay purposes retaining the other half for further geological investigation, but where volume support is important with respect to sample representivity, the core is sampled whole. Digital photographs of all the core is taken prior to cutting and sampling and stored for reference purposes. For RC drilling, the entire sample interval is split using a cyclone splitter attached drill rig with the aim of producing a ~3 kg sample for analysis. Most samples are dry but where wet samples are collected, this information is recorded in the database against the interval. Wet samples are mostly at rod changes where groundwater inundates the drill column. The wet samples are routinely sampled by using a metal scoop to deliver approximately 3 kg samples. The sample bags are removed from the drill site by SIGMC field technicians. For AC drilling, the entire 1 m interval of sample is recovered by the drill rig offsider in a bucket and laid on the ground in rows where each meter is represented by a single pile of sample. A scoop sample is collected per interval and two separate metre intervals are composited prior to being submitted for analysis. In certain instances (for testing of paleochannel deposits) more rigour is applied to the sample collection process. This includes homogenising the entire 1 m interval of sample through a riffle splitter to approximately 3 kg. In wet horizons the total sample is collected and manually subsampled utilising a fractional scooping technique carried out at the analytical laboratory. The method reduces overall sample bias. The sample bags are removed from the drill site by SIGMC field technicians. Recoveries Different drilling techniques have different recovery rates for the samples, as described below. Exploration DD holes are anticipated to deliver 100 % sample recovery, however; if core loss occurs due to unconsolidated ground or poor drilling technique, it is measured and recorded by the drillers and geologist. Diamond drilling completed prior to 1995 did not use core blocks to demarcate intervals, resulting in unreliable core recovery estimates. RC sample recoveries are between 70-95 % depending on the amount of fine material and groundwater encountered, while AC drilling recovers up to 90 % or the material. Volume mass calculations suggest a theoretical RC sample interval mass of 37 kg and previous testwork evaluating the recovery across various RC drill rigs employed at St Ives returned an average sample recovery of 80 %. Analysis and monitoring of drill sample recovery is ongoing and part of the QAQC of rig management by the Geologist.
P a g e 43 | 137 Core orientation Core orientation refers to the technique of marking the diamond core so that it can be oriented at surface into the same relative position as in the ground. This is achieved by either using a simple metal spear that leaves an imprint on the end of the core or a electronic device that records the orientation of the core in the hole so it can be matched up on the surface. Once the core has an orientation mark, this can then be laid out and pieced together like a jigsaw. An orientation line can then be drawn along the core, which represents the bottom of the core. From this line, measurements of orientation (azimuth of the core) and the dip (angle of bedding and structures) can be determined. Orientation of core can only be achieved on competent Diamond core, and intervals are determined by the geologist based on the requirements of the hole. Typically, early-stage holes are orientated for their entire length whereas resource holes are only orientated closer to the mineralised area. Logging Logging intervals vary from 1 m (AC/RC) to cm scale (DD). Data routinely collected includes lithology, structure, mineralisation, alteration, geophysical (magnetic properties) and geochemical properties (multi-element assays) and physical measurements (rock hardness, geotechnical RQD, density, acid rock drainage). The lithology, alteration, and structural characteristics of core and percussion chips are logged directly to a digital format and entered into the database after validation. In addition to the above data, other requested work is completed off site by technical experts, providing services such as petrographic analyses, mineralogy studies and geochronology. This work often forms part of ongoing research development with cooperative ventures. This data is included in standard reports and databases for current and future use. All half core is retained on site for current and future reference at core storage facilities on the St Ives lease which may include application of new technologies and the review of theories. Assay pulps are stored at the Core Farm in labelled individual paper envelopes within catalogued cardboard boxes. AC and RC chips are stored in labelled sealed compartment trays for future reference. Appropriate procedures and controlled documents outline the retention, storage and material access processes. The Qualified person’s opinion of the 2021 exploration and resource extension drilling is: a) All drilling and exploration field activities are supervised to ensure health and safety and maintain appropriate technical standards. b) The drillhole surveys are adequate by type and length for the intended purpose. c) Utilising orientated core significantly enhances recorded information to assist with 3-D modelling d) The drillhole database and subsequent modelling aligns to core recovery losses and should not cause material errors e) Post QA/QC screening and validation exploration results are incorporated into the estimation of Mineral resources; the categorisation of Mineral resources is described in Chapter 11. f) Validated exploration results are used in the 31 December 2021 Mineral resource estimation. g) Individual exploration drillhole information is not viewed as significant or material to the Mineral resource and Mineral reserve reporting at St Ives and consequently exploration data is not presented. 7.2.3 Results The results discussed in this section are only results that are deemed to be material to resource and reserve estimate. Invincible Mine Exploration activity since 2015 has largely focused on mineralisation within the BFM, as the highest grade intercepts are typically hosted within this unit. Over the last two years the improved geological understanding on extensional
P a g e 44 | 137 veins has allowed these to be targeted for resource conversion and these now make up a large component of the exploration program at Invincible. Underground Mineral reserve growth at Invincible for 2021 was by surface drilling at Invincible South and by underground drilling at Invincible South and the link area between the Invincible and Invincible Deeps zones (Figure 7.2.1). This drilling was largely successful Surface drilling tested the Invincible Footwall South and area for open pit potential Figure 7.2.1: Schematic long-section through Invincible Mine Source: St Ives CPR, 2021 Exploration at Invincible for 2022 will focus on converting the footwall mineralisation into reserve extending mudstone mineralisation down plunge at Invincible South. This will be achieved through a combination of surface diamond and underground drilling. Hamlet North The Hamlet North deposit is located to the north of the existing Hamlet deposit and was discovered in 2017. It is situated within the Defiance Dolerite Unit 4, a granophyric unit within the Defiance Dolerite that has proven to be a strong geological host unit when interacting with the Hamlet Shear. It has a ~150 m strike and 10-15 m wide with a down plunge extent of >750 m. Exploration during 2021 focussed on following up drilling that was completed in 2020 (Figure 7.2.2) that extended mineralisation 150 m down dip of the current reserve. This drilling converted this mineral inventory to resource from underground drilling. Exploration drilling for 2022 at Hamlet North is focused on testing for mineralisation in the DF4 granophyre at depth and working in advance of the mining front to convert mineral inventory to resource from underground drill platforms.
P a g e 45 | 137 Figure 7.2.2: Schematic long-section through Hamlet North Mine Source: St Ives CPR, 2021 Neptune Mine The Neptune deposit is located in the Revenge Mining Complex. This area has had extensive exploration for gold completed since the 1990’s with over 3 Moz mined to date. The Neptune Open Pit Mine has produced 500 koz to date. Recent drilling over the last 3 years, combined with increased gold price expanded the Neptune Stage 7 reserve to 96 koz in 2020 (Figure 7.2.3). Drilling completed during 2021 focused on upgrading the existing Neptune resource (Stage 8) and APN areas. The Stage 8 drilling focused on converting inferred resources to indicated resources and targeting a saddle area within the resource. 2021 mine cost assumptions meant that that there was no change reserve in this area as the optimised pit shell was above $1300. The Qualified person’s opinion of the 2021 exploration and resource extension drilling is: a) All exploration activities, including drilling, database management, validation and QA/QC, prior to incorporating relevant data into the resource modelling and estimation process, is viewed as sufficient, appropriate, technically assured and suitable to support Mineral resource estimates.
P a g e 46 | 137 Figure 7.2.3: Schematic Plan View of the Neptune Mine Source: St Ives CPR, 2021 7.3 Hydrogeology The most significant groundwater system in the Lake Lefroy area is the Lefroy Paleo-drainage system, comprising a series of channelled, fine to coarse grained sand horizons representing infilled paleochannels. Generally, the paleo- channel consists of an upper paleochannel aquifer (fine silts grading with depth to fine to medium sands, a middle aquitard (clays) and a lower paleochannel aquifer (coarse sand and gravel). Groundwater is also encountered in the basement rocks, where enhanced permeability has been developed, due to weathering, fracturing, shearing or faulting. Weathering of the upper basement in the St Ives area has largely resulted in a saprolite regolith, with low permeability material and limited aquifer potential, although the transition zone from saprolite to basement rocks (saprock) can be moderately permeable depending on the host rock type. There have also been some significant groundwater inflows to some of the existing pits from fractured basement, typically associated with shear zones hosting the orebodies. In some cases, inflows of around 1 Ml/d have been recorded with some dewatering bores (targeting these shears) yielding in excess of 5 l/s. Some of the existing pits have also experienced measurable groundwater inflows from fractured granitoids, with bore yields of up to 3 l/s. For open pit reserves, an estimate of rock-mass permeability and pre-mining phreatic surface shall be determined using geotechnical and/ or exploration holes. Airlift or packer testing shall be carried out for this purpose. All open pits currently in reserve have been subject to hydrogeological studies and their depth and transmissivity quantified for the aquifers and groundwater. With over 40 open pits successfully mined to date, should any additional open pit designs be proposed in the future, information will be drawn on from the active pits / pits already investigated which are situated in close proximity.
P a g e 47 | 137 The Qualified persons opinion of the 2021 hydrology is: a) St Ives has reliance on appropriate hydrological studies conducted at all relevant sites b) Hydrology is not viewed as presenting a material risk to St Ives or the December 2021 Mineral resource and Mineral reserve estimates. 7.4 Geotechnical A representative number of all resource diamond drill core is geotechnically logged before the core is cut and sampled for laboratory testing, preferably using a HQ core size. In addition, targeted, dedicated geotechnical holes are required for any study and are planned by the responsible Geotechnical Engineer. St Ives Gold Mine guidelines for open pit studies are a minimum of one drillhole per 100 m of pit crest, or one drillhole pierce point per 4 ha of pit slope surface. The entire recovered oriented core is logged to determine representative rock- mass. Studies for underground projects is a pierce point density of 50 m x 50 m for non-oriented rock-mass logging and 100 m x 100 m for oriented logging. Logging may be limited to 100 m either side of the orebody if no mine infrastructure is likely outside these limits. Where insufficient core logging data is available, line or cell mapping is conducted at surface or underground exposures. The minimum representative level of data is 100 m per kilometre of pit wall bench or underground drive exposed, per geotechnical domain; however, this is largely dependent on-site specific conditions and shall be dictated by the responsible Geotechnical Engineer. Representative numbers of core samples for laboratory tests are shown in Table 7.4.1. Table 7.4.1: Laboratory testing of core samples Type of test Samples Underground Open pit Direct Shear (for weathered rock, saprolite, fault gouge, etc.) 5 per domain Uniaxial Compressive Strength (UCS) (with Youngs Modulus and Poisson’s ratio determination) 5 per lithology Triaxial Compressive Tests (5 suites at four confining pressures) 20 per lithology Brazilian Tensile Strength 5 per lithology Acoustic Emission (AE) 3 per site Source: St Ives CPR, 2021 The Qualified person’s opinion of the 2021 geotechnical work is: a) St Ives has completed all appropriate testing for the current life of mine reserve and continues to test all new significant discoveries b) Geotechnical domains and lithologies are based on core logging and modelled by the Geology department c) Sample testing is adequate for the purposes of this report d) The quality of the sampling and laboratory testing is adequate to support the Mineral resource and Mineral reserve estimates.
P a g e 48 | 137 7.5 Density Regular bulk density measurements are taken on exploration drill core according to a formal protocol. Representative samples are also collected from both underground and the open pits which further support the applied SG values. For new projects, where no local SG data is available, known densities from similar deposits and lithologies are applied and later validated against representative samples. All SG data is archived in the database. The SG collection process for bulk samples is undertaken by trained St Ives staff applying the industry accepted immersion methodology (weight in and out of water). For unconsolidated material, SG measurements are completed at an accredited laboratory (E Precision, Perth) making use of the buoyancy method (Archimedes principle), wax buoyancy method and the calliper method (filling sample into a defined volume). Moisture estimates are critical due to the fact that dry density is applied to Mineral resource tonnages. The Nuclear Moisture Density Gauge method was used in 2003 to establish SGs for material with a high moisture content. Bulk density at St Ives behaves consistently within both lithology and ore types. This is on the basis of a 30 year mining history. The densities applied by domain are summarised in Table 7.5.1. Table 7.5.1: St Ives density values Domain Density (t/m³) Lake sediment (overburden) 1.6-1.7 Oxide (deeply weathered Archean) 2.1 Transitional (weakly weathered Archean) 2.3-2.5 Black Flag sediments 2.5-2.7 Leviathan/Paddys fresh intrusive 2.7 Leviathan/Paddys fresh mafic 2.8 Note: a) The Qualified person considers the bulk density testing to be adequate for reserves and resource estimation. The tonnage estimation based on the bulk densities appear to have little bias. b) The qualified opinion is that bulk densities are consistent with lithology and ore types estimated over a +25 year mining history. Source: St Ives CPR, 2021
P a g e 49 | 137 8 Sample preparation, analyses, and security The majority of St Ives’ samples are assayed externally by Australian Laboratory Services Pty Ltd (ALS) with support work being carried out by Bureau Veritas (KALASSAY) and SGS Laboratories in Perth. ALS has a laboratory accreditation number (825) and a site certificate of registration (C-90494). An agreement is in place for ALS to provide analytical services for all St Ives samples, including underground and open pit grade control, and exploration. KALASSAY and MinAnalytical are also used as umpire laboratories. ALS is an independent testing, inspection, certification and verification company headquartered in Brisbane, Australia (Table 7.5.1 and Table 8.2.1). MinAnalytical is a subsidiary of the Parenti Company. It was announced in January, 2022 had been purchased by ALS. Table 7.5.1: Analytical laboratory accreditation Laboratory Certificate number Accreditation number Independent testing inspection ALS Perth 825 Yes ALS Kalgoorlie C-900494 Yes MinAnalytical 18876 Yes Note: a) Certificates were reviewed by the Qualified person b) The Qualified person is of the opinion that the analytical laboratories are certificated and have sufficient process to minimise material errors Source: St Ives CPR, 2021 All samples are submitted for gold analysis by fire assay supported by either screen fire assay or LeachWell analysis for certain mineralisation types. This is done to provide check assays and investigate any potential sample bias related to coarse free gold. In 2022 St Ives will commence using Photon Assay as a standard analytical method for gold analysis. This methodology is considered preferable where coarse free gold is present. Testwork completed over the past two years has demonstrated that the assay method is robust. Photon assay allows large samples to be measured and provides a true bulk reading independent of the chemical or physical form of the sample. Using uniquely numbered sample jars, the process is completely non-destructive, and samples can be retained for further analysis if required with significant reduction in turn-around times. There is a security gate and swipe card system to account for all mine personnel and numerous security video cameras placed around the site. Deposits known to contain visible gold renders the drill core susceptible to theft; however, the risk of sample tampering is considered low. Bagged samples are transported from a secured locality at the Property by a St Ives owned truck to the laboratory facility for further preparation and assaying. All samples received by the laboratory are physically checked against the despatch order and St Ives is notified of any discrepancies prior to sample preparation commencing. No company personnel are involved in the preparation or analysis process. 8.1 Sample preparation Sample preparation is carried out according to the following procedure: Upon receipt, all samples are sorted and validated against the relevant documentation. Samples are weighed and entered into the Laboratory Information Management System (LIMS). Workflow through the preparation and analytical stages is tracked through LIMS according to assigned bar-coded sample labels. Samples are dealt with sequentially according to SIGMC requests. The samples within their calico bags are placed in a modern forced air oven and dried at 105 ºC.
P a g e 50 | 137 If required, as in the case of DD core, the samples are processed through a jaw crusher to 2/3 mm (90 % passing). If the resulting crushed product is greater than 3 kg, the sample is split using either a stainless steel riffle splitter or a rotary splitter. A 3 kg split is pulverised in a LM-5 pulveriser. A scoop of pulverised sample is placed in a labelled paper sample bag for analysis and the remainder returned to St Ives for cataloguing and storage. The Qualified person considers sample preparation procedures used by external laboratories contracted adequate for reserve and resource estimation. Laboratories used are all accredited with robust internal QAQC procedures. Sample preparation is subject to regular audit by St Ives and has its own QAQC procedures in place to ensure sample preparation is completed correctly. The Qualified person has reviewed the sample preparation and security procedures. The sample preparation is found to be adequate with effective supervision and in line with industry leading standards. No material bias is indicated that could potentially impact the sampling preparation and analysis. Sample security enforcement is reliable with low consequence if in the unlikely event of security protocols failure. 8.2 Sample analysis Samples submitted to the ALS and MinAnalytical, laboratories are analysed by the following standard, analytical methods: Gold (ppm) by 50 fire assay with an atomic absorption spectrometry (AAS) finish (AA25 or AA26) and for low level (ppb) Au (AA22). The pulverised sample is weighed and mixed with a fluxing agent. In addition to the flux, Lead is added as a collector. The sample is then heated in a furnace where it fuses and separates from the collector. The Gold is then extracted through a process called cupellation and analysed. General geochemistry of a 56 element package (including rare earth elements) by inductively coupled plasma (ICP) analysis (ME-MS61r). The sample is digested with an acid. The residue is topped up with dilute hydrochloric acid and analysed by inductively coupled plasma-atomic emission spectrometry. Gold (ppm) determined through LeachWell analysis specifically targets ore sources with an expected higher coarse gold component (paleochannel). This is currently completed at ALS Perth. Samples are dried, pulverised and weighed into jars. An equal or greater known weight solution containing cyanide, Leach WELL and NAOH is then added to the jar. The jar is then rolled or tumbled for at least an hour the allowed to stand for approximately ten minutes until a layer of clear solution is available for sampling and reading by Atomic Absorption Spectrometer. The grade of the original is calculated from the solid/solution ratio and the AAS reading. Photon Assay – Samples are crushed to a nominal 2 mm then load into barcoded jar. Place jar into automated conveyor. Samples are hit by a high energy X-ray source enabling gold atoms to be detected and counted The Qualified person considers analytical procedures used by the external laboratories contracted adequate for reserve and resource estimation. Laboratories used are all accredited with robust internal QAQC procedures. Analytical method is subject to regular audit by St Ives and has its own QAQC procedures in place to ensure sample preparation is completed correctly. The Qualified person has reviewed the certificates and is of the opinion that the analytical laboratories are certificated and have effective process and protocol in place to ensure quality control and assurance and minimise any material errors. Table 8.2.1: Analytical laboratory accreditation Analytical laboratory accreditation Laboratory Certificate number Accreditation number MinAnalytical (MinA) Kalgoorlie 18876 ,21075 (ISO/IEC 17025) Australian Laboratory Services (ALS) Kalgoorlie QEC27912, C-90494 (ISO 9001:2015) Australian Laboratory Services (ALS) Perth 825, 23001 (ISO/IEC 17025) Source: St Ives CPR, 2021
P a g e 51 | 137 The Qualified person has reviewed the certificates and is of the opinion that the analytical laboratories are certificated and have effective process and protocol in place to ensure quality control and assurance and minimise any material errors. 8.3 Quality control and quality assurance (QA/QC) QA/QC is an integral aspect of the entire sampling and assaying process. It provides a measurement into the reliability of the collected data and specifically an understanding of the accuracy and precision of the results. QA/QC monitoring ensures that best practice is followed throughout the drilling, sampling, preparation and analytical processes. St Ives has implemented a comprehensive QA/QC system, comprising of both written procedures and consistent monitoring by the QA/QC officer and resource geology group supported by internal and external audits. Most of the assay work is completed by ALS in Kalgoorlie under a formal contract. Routine interaction and periodic meetings are held between SIGMC staff and ALS management to ensure all obligations are met, with up to two laboratory audits per month. An example of the audits completed during June 2020 is shown in Table 8.3.1. St Ives’ QA/QC protocol comprises the routine insertion of certified reference materials (CRM), duplicate samples and blanks to ensure sample quality. The QC sample types are summarised in Table 8.3.2. St Ives’ procedures guide the responsible geologist regarding the minimum frequency of QC samples to be inserted into their sampling programs. This is controlled during sample register creation and monitored continuously by the QA/QC data controller and by the project geologist during drilling. The QC samples are inserted at a rate of 1 in 20 for non-mineralised zones and 1 in 10 for mineralised areas. All standards used are CRMs that have been subject to internal ‘round robin’ analyses. Quartz washes (barren material) are inserted between and after extremely high-grade samples to prevent any carry over during sample preparation. Table 8.3.1: Laboratory audits Date Auditor Laboratory Audit conclusions 24/02/2021, Q1 L.Smuts / M Caporossi ALS Kalgoorlie Large sample volumes, GFA volumes honoured as per contract, LM5 lid replacement program completed. ME/ASD sample TAT in Kal, Au priority to ensure ME/ASD within 21 days. New acting lab manager Brenen Christie under Greg Brosnan supervision. Face sample TAT priority remain important to GFA, also sample volumes to honour GFA contract volumes. 09/02/2021, Q1 L.Smuts / Samuel George / Kab Karuna / Kyle Wohlers ALS Perth Covid measure remain in place, LM5 No 33, 34 &36 operator had to be retrained. Supervisor conversation reiterating ALS cleaning procedures. New better sealing LM5 lids in place at all LM5s, sealing significantly improved. All GFA full core samples processed in Orbis 100’s, no primary crushing required, improved workflow and contamination potential minimised. 21/05/2021, Q2 Gail Clark ALS Perth No actions required, complete lab overview provided by ALS lab manager, Lab expansion started in fire assay section, planned 25 % increase in capacity. 09/06/2021, Q2 L Smuts, SIGM Geology Team ALS Kalgoorlie James Egan, Claudia, Jesse Osborne, Thomas , Darren Murray and Andrew, Lab process review and training completed for sites. CRM performance, increased failures due to an operator not following procedure. TAT starting to blow out, Kal ALS struggle with sample throughput due to staff shortages. 05/09/2021, Q3 L Smuts Perth ALS TAT blow outs for GFA due to staff shortages, weekly meetings implemented to ensure priority samples processed. One operator on LM 5 was not cleaned as per procedure, poor cleaning practices. 06/09/2021, Q3 L Smuts Kalgoorlie ALS TAT blow outs for GFA due to staff shortages, weekly meetings implemented, Perth ALS loadshedding assisting TAT backlogs. Pb button slag separation observed, Boilovers, LM2 lid seals issue, 23/11/2021, Q4 L Smuts Kalgoorlie ALS Orbis internal cleaning improvements being reviewed, all Q3 audit issues was resolved except for ongoing testwork being completed in Perth ALS reviewing PB slag separation if it contain gold, as well as the wet lab temperature effects on gold results.
P a g e 52 | 137 03/12/2021, Q4 L Smuts Perth ALS Lab capacity expansion ongoing, LM5 mill cleaning practices improvements, sample TAT backlog resolution plan reviewed and sample priority weekly meeting implemented. Ongoing testwork related to PB slag separation if it contain gold, as well as the wet lab temperature effects on gold results. Source: St Ives CPR, 2021 Table 8.3.2: Quality control type summary Sample description QC Stage Comments Field duplicate Monitors sample source and sampling procedure Duplicate sample taken identically as the original sample (½ core; RC: duplicate split taken in field) Laboratory duplicate Preparation Repeats taken by ALS to monitor the laboratory process Coarse crush duplicate Preparation after jaw crush, but before pulverising Implemented October 2013 to ensure that whole diamond core samples can get a representative duplicate Standard/Blank Analytical Certified sample of known concentration: pulps (standards), coarse crushed matrix-matched basalt (blank) Pulp re-assay Analytical Repeated re-assay on the analytical pulp as requested by the QA/QC geologist from a QC failure or as a lab check Pulp umpire Analytical (at the end of a program) Random subset of pulps sent to an umpire laboratory to ensure analytical accuracy and precision Source: St Ives CPR, 2021 To monitor accuracy across grade ranges, low, medium and high-grade CRM samples are inserted at relevant intersections. All sampling and quality management is supervised by the geologist responsible for the drilling program. If required, the responsible geologist may increase the quantity of QC samples. For DD core, half of the original core is retained as a duplicate and a duplicate split is taken from the cyclone splitter for RC samples. Crush duplicates and pulp duplicates are taken during the sample preparation process and re-assayed by the primary laboratory. The rate of insertion for crush and pulp duplicates is 1 in 20. Secondary check analyses through umpire sampling are completed with pulverised duplicate samples submitted to an independent umpire laboratory. The umpire sampling program covers both site wide as well as project specific data. No systematic long term sample bias has been identified from the umpire sampling process. ALS and KALASSAY routinely insert their own blanks and two CRMs per batch. These QA/QC results are available for review by SIGMC. QA/QC samples are analysed through the same process as all samples, and upon completion these assay results are loaded into the database and evaluated against the QA/QC pass and fail criteria. Results for all QA/QC samples from every laboratory batch are analysed to determine assay accuracy, precision and repeatability. Assays which return results outside a standard set of control guidelines are flagged automatically and a warning notification is sent to the responsible geologist. If a batch fails, it is quarantined in the database until the geologist concerned has examined the data and determined the course of action. All QA/QC results are collated and reported monthly to the geology team. The data analysed includes sample size (weight), CRM and blank performance and duplicate behaviour. All geologists receive training in QA/QC and use the QAQCR program to evaluate the data and are expected to actively monitor and maintain the quality of the data they are producing. No systematic long term sample bias has been identified from the QA/QC process. The data applied to the Mineral resource estimates demonstrates sufficient accuracy and precision as deemed by the Qualified person.
P a g e 53 | 137 9 Data verification The planning and execution of both mine and regional exploration programs at St Ives is to industry best practice and aligned with numerous developed standards and procedures reflecting local best practices. To ensure this ongoing compliance, the process consists of the development of consistent procedures, regular audits and appropriate sign-off documentation feeding into all key elements used in producing Mineral resource estimates. The key components of the geological data acquisition framework include: Validity – Controls to ensure the validity of key activities. Accuracy – Controls to establish the accuracy of data inputs and outputs. Completeness – Controls to ensure the completeness of the process followed. Timing – Preventative and detective controls to identify potential risk and deviation of quality. Segregation of Duties/Sign-off – Key members of the senior team are responsible for different aspects of the process. The Qualified person is of the opinion that the data verification process and protocols are adequate to minimise any material errors, are in line with industry leading standards and underpin technical assurance. 9.1 Data management Exploration, grade control and resource development data at St Ives is stored in an SQL database format using a proprietary front-end software interface (Datashed®). A central database geologist and database QA/QC administrator manages all aspects of data entry, validation, development, quality control, training and specialist queries. The majority of logging data is directly captured using Maxwell Logchief® software and linked to the Datashed® database. Geological face mapping in the underground mines and highwall mapping in the open pit is captured manually on paper logs and later transferred to digital format. Core logging is digitally captured directly onto field Toughbooks which are synced into the database via controllers. Datashed® enables the control of tasks, permissions and database integrity. The SQL server database is configured for optimal validation through constraints, library tables, triggers and stored procedures. Data that fails these rules on import is rejected or stored in buffer tables until corrected. This meets industry best practice and SOX requirements. A dedicated database geologist manages all aspects of data entry, validation, development, quality control and specialist queries. All exploration data control is managed centrally, from drillhole planning to final assay, survey and geological capture. Most logging data (lithology, alteration, and structural characteristics of core and percussion chips) is captured directly to customised digital logging tools with stringent validation and data entry constraints. Geologists load data into buffer tables where initial validation of the data occurs. The data is uploaded into the database by the geologist after which an additional automated validation process is conducted on the data and the geologist is notified if there is an issue. The issue must be addressed, or the data may not be loaded into the database. Each drillhole is allocated a unique identification number. This can only be uploaded into the database if it contains specific required metadata including spatial location, hole type and total depth. Individual samples collected for assay analysis from the holes are issued with a unique sample number and depth interval. The sample recoveries and collection dates are recorded for these samples. All intervals are logged and database captured against logging codes which provide specific and consistent information relating to lithology, alteration, veining and structure. All assay data is automatically uploaded into the database in a text format known as a SIF file. These files include detailed information about the batch, methods, units, detection limits and elements assayed. The file also includes all QA/QC data in the sequence of analysis. The assay data is in a normalised format to ensure all required information is stored for each sample, and to allow multiple assay result storage for each sample. Assay results are loaded against each unique sample and represent the value for that sampled interval. Assays are only loaded once they pass quality testing.
P a g e 54 | 137 Once all data for a drillhole has been entered into the database, the responsible geologist validates the drillhole. A validation extension has been developed in Datashed® to run queries against the database, which includes checks for incorrect collar locations, testing for overlapping, missing or incorrect downhole surveys, and incorrect collar location. Procedures and templates are available for all geological data. Backups are made to the St Ives server on a regular schedule. A copy of the database also resides on the Gold Fields back-up server in Perth. Digital certified assay certificates in PDF format are backed up on the St Ives server on a regular schedule. The Qualified person considers this meets industry best practice and fulfills SOX requirements. The Qualified person’s opinion of the data management is: a) The data management process and protocols are adequate to minimise any material errors. b) Regular validation of the database and data management process is aligned with standard industry practices, verified to GFA SOX measure quarterly as a minimum 9.2 Plant Sampling Daily composite samples of process plant feed and tailings streams are taken to assist with on-site gold accounting and reconciliation. These samples are collected using a combination of automatic sampling stations as well as manual cuts using appropriately designed samplers. In accordance with Gold Fields Plant Metal Accounting Standard, a gold in circuit survey is undertaken monthly to reconcile (by mass balance) the back-calculated gold grade of the mill feed with the mill feed grade estimates obtained using plant samples and assays. The monthly variance between the assayed grade and the back-calculated grade is monitored, and an investigation is required to be carried out if this variance exceeds the minimum allowable levels outlined in the Gold Fields Plant Metal Accounting Standard. 9.3 Drilling and sampling A series of written standard procedures exists for all sampling and core cutting activities at St Ives. Daily visit by geologists and weekly visits to drill rigs and the core farm are carried out by project geologists to review sampling practices. These are also supported by quarterly routine SOX walkthroughs conducted by Senior geological staff that review drilling, sampling procedures. Sample registers are used to record sample recovery and type. After loading the data and corresponding assay results into the database, standard statistical comparisons are carried out on the information including Quantile-Quantile (Q-Q) plots which help explore potential bias between drilling techniques or drill programs. These findings are then recorded in the Mineral resource reports. Testwork has been completed at site to quantify the effects of wet sampling especially in paleochannel environments. Where it may be deemed needed holes may be twined or additional testwork completed to ensure sampling is of reasonable quality. The Qualified person considers drilling and sampling methodology to be adequate for reserve and resource estimation. The Qualified person is of the opinion that the drilling protocols described in this report are adequate to minimise material errors and provide the necessary technical assurance. The Qualified person is of the opinion that the sampling protocols are adequate to minimise material errors and the analytical procedures reflect industry standard practice or better and are appropriate for resource estimation. 9.4 Survey Drilling contractors are trained to used downhole survey equipment by the service providers and are referred to Section 7.2. Downhole survey tools have internal QAQC processes that are required for the survey to be considered valid. The tools are routinely calibrated on either fixed test stands or at the service providers facilities. Drillhole collars are either picked up by trained geological assistant personnel using a standardised procedure or the survey department.
P a g e 55 | 137 Daily visits by geologists and weekly visits to drill rigs and the core farm are carried out by project geologists to review survey practices. These are also supported by quarterly routine SoX walkthroughs conducted by Senior geological staff. Survey data is checked electronically daily by a geologist and reviewed by project geologist per exploration program to ensure there are no survey errors. The Qualified person is of the opinion that the survey protocols are adequate to minimise material errors. 9.5 Sample analysis Sample analysis methodology and procedures is discussed in Section 8.2 and Section 8.3. St Ives’ process for sample analysis uses reputable companies to conduct the analysis who have robust procedures and are accredited. Audits are completed routinely to ensure sample analysis is done correctly. The QP considers that process used and controls in place for sample analysis ensure that assay sample analysis meet the requirement for reserve and resource estimation. The Qualified person is of the opinion that the sample analysis protocols are adequate to minimise material errors. 9.6 Geological modelling All acquired data is based on historic and current knowledge derived over many years of exploration and mining at St Ives. Peer reviews involving both internal and external corporate consultants and industry experts are routinely undertaken including site visits and continual review of best practices. Guidance from these visits help align current thinking and involve investigating new innovative methods to facilitate continued excellence in exploration, mining and resource estimation. In addition, appropriate internal and external training of new and existing staff to applied methods and techniques, together with management oversight, ensure on-going best practices. A large amount of geological research has also been completed at St Ives. This includes academic and industry based publications, theses, internal reports and ongoing cooperative research development with industry experts. Geological interpretations are produced considering both plan and sectional orientations. All geology and mineral resource model variations are documented and subject to a formal peer review and hand over procedures with the findings archived within a centralised electronic filing system. Geological interpretation does have the potential to impact materially on the estimated quantity and quality of the Mineral resources and reserves. Incorrect assumptions regarding volume and geological and/or grade continuity will impact the estimated contained metal. Ongoing support from expert geologists, site and corporate peer reviewers, external reviews as well as the model change authorisation process, ensure that the geological interpretation is the best representation based on the data available and the knowledge and understanding of the mineralisation. The current understanding of the geological setting, host lithologies, structural framework and alteration controls on mineralisation are considered by the Qualified person to be appropriate to support the declaration of Mineral resources and reserves at St Ives. The geological model is viewed in 3D, plan and cross-section to check if the geological units are constrained in the model. The geological model is also validated against mapping data if available. If logging data does not fit the conceptual model or surrounding holes in the interpretation, a validation/review of the original logging is carried out. This may result in re-logging of the hole or change to the model and interpretation depending on the outcome of the model. Geological models for reserve and resource assessment are incorporated in the MCA (Model Control Authorisation) process that incorporates formalised peer review and signoff. A further layer of review is that all material geological models are reviewed by the Corporate Technical Services Team. The QP considers the modelling procedure and review process to be adequate for Resource and Reserve estimation. Models are updated as new data comes in and the geological interpretation may change as more information becomes available. The Qualified person’s opinion of the geological modelling is: a) The geological modeling protocols are adequate to minimise material errors
P a g e 56 | 137 b) The controls have been reviewed and the adequacy is reasonable and that material bias or errors are unexpected c) The systems to reduce human and procedural errors, checks and balances are adequate and minimise material errors d) The protocols are adequate as reviewed and that the Mineral resource models are based on sound data and are reasonable
P a g e 57 | 137 10 Mineral processing and metallurgical testing 10.1 Testing and procedures 10.1.1 Background The St Ives mining operations currently includes the following: Two operating underground mining complexes; Invincible and Hamlet. One operating open pit mine; Neptune. Multiple potential future open pits reserves; Pistol Club, Justice, Trinidad and Swiftsure. Multiple mined ore stockpiles. The various ore sources are all treated in the one processing facility, being the Lefroy Plant, which consists of a primary crusher, single-stage SAG mill, gravity recovery circuit, leaching, CIP, carbon elution, and goldroom processing stages. Due to the blending of multiple ore sources into the crusher and mill feed, it is difficult to use existing plant performance information to assign directly to a single ore source and/or type. Therefore, plant forecasting is largely based upon results emanating from metallurgical testwork carried out on geological core samples. However overall plant recovery performance is tracked against the expectations derived from the testwork, to check for significant variances or discrepancies. It should be noted that the following sections may refer to results associated with deposits that have not been declared as Reserves as at end-2021. 10.1.2 Metallurgical sampling & testing Routine metallurgical recovery testwork is undertaken on geological core samples selected from potentially prospective Mineral reserve areas. Upon definition of discrete geological domains or lithologies, individual composite samples of diamond drill (DD) core are selected and collected by the relevant geologist for subsequent laboratory-scale metallurgical testwork. Samples are typically composited from DD core to obtain single continuous mineralised intercepts (including expected internal and external ore dilution) from a known single spatial location, typically (and more recently) representing single geological domains or lithologies. The number of samples selected per potential mineralisation source is approximately based upon the nature (size and geological homogeneity) of the orebody, the study stage (i.e., scoping, pre-feasibility or feasibility), and the variability of the metallurgical recovery response, when known. For reference, St Ives follows the Gold Fields Australia Metallurgy Testwork Sampling Guideline (Controlled Document GFA-ENG-ID010.docx) issued in 2020. The core samples are dispatched to an independent third-party laboratory for metallurgical testing, currently ALS Metallurgy, Balcatta, Western Australia which is an accredited laboratory. The Gold Fields standard testwork protocol is designed to reasonably reflect the performance of the existing process plant and typically includes: Head analysis multi-elemental scans (including Au (gold), Ag (silver), Cu (copper), As (arsenic), C-suite (carbon), S-suite (sulphur), Hg (mercury), Sb (antimony), Te (tellurium) and quantified x-ray diffraction (QXRD) analyses. Acid mine drainage (AMD) analysis, being Total S, Acid Neutralisation Capacity (ANC), Net Acid Generation (NAG), Total Acid Production Potential (TAPP), Net Acid Production Potential (NAPP), Net Acid Generation (NAG), and pH. Comminution characteristics including crushing work index, abrasion index (Ai), Bond BWI and SMC SAG milling parameters. Gravity recovery estimation by laboratory Knelson recovery, followed by mercury amalgamation of concentrate. Leaching profile of gravity/amalgam tails, including leaching profile of Au, Ag, Cu, pH, dissolved oxygen (DO), and free cyanide.
P a g e 58 | 137 Multi-elemental inductively coupled plasma mass spectrometry (ICP) scans of final leach solution. Leach solids residue analysis for Au, Ag and Cu. Slurry viscosity testing for oxide samples Diagnostic analysis of tailings residue if warranted. For extensions to currently mined projects or the re-establishment of former mines, existing historic testwork is reviewed for sample representation across the remaining orebody, and additional samples are sought when required. Metallurgical testwork programs are ongoing at St Ives, based upon progressive drilling and the definition of new or existing mining area extensions that are associated with the mine’s exploration programs. Recent metallurgical programs undertaken in 2021 included testwork carried out on core samples taken from extensions of the Invincible underground mining complex. For St Ives, the testwork methodology was altered in early 2021 to exclude the sulphides scavenging and regrinding testwork steps, since this section of the plant was recently decommissioned due to poor reliability and performance. This change to the testwork methodology has potentially slightly lowered the gold recovery test results for sulphide (fresh ores) but is considered to provide a better representation of the actual plant. Metallurgical investigations are currently in progress to determine the potential benefits to selected fresh ores of sulphides scavenging and regrinding, however such work is considered as being beyond the scope of, or requirements for, the end of2021 reserves metallurgical studies. 10.2 Relevant results The following report sections summarise the available metallurgical testwork concerning the reserves. 10.2.1 Sample head analyses Table 10.2.1 shows a summary of the average sample head analyses grouped by underground reserves mining areas. The underground ore samples are reasonably consistently enriched in sulphide sulphur, carbonates, calcium (Ca) and magnesium (Mg); and contain relatively low concentrations of organic carbon (C organic), copper (Cu), lead (Pb), zinc (Zn), arsenic (As), mercury (Hg) and antimony (Sb). The Invincible underground area samples are relatively enriched in tellurium (Te). Table 10.2.1: Summary of St Ives underground mine areas average sample head analyses Analyte Unit Invincible South Invincible Deeps Invincible UG Hamlet North Sample count no. 31 14 13 4 Au ppm 8.60 8.70 4.62 7.12 Ag ppm 1.12 0.98 0.60 <2 As ppm 9 12 10 <10 Al % 7.26 10.21 6.51 6.17 Ba ppm 703 749 623 390 Be ppm <5 <5 <5 <5 Bi ppm <10 15 10 <10 C total % 1.27 0.94 1.23 2.03 C organic % <0.03 <0.03 <0.03 <0.03 Ca % 2.76 2.77 2.88 5.70 Cd ppm <5 <5 <5 <5 Co ppm 21 23 21 41 Cr ppm 117 100 103 180 Cu ppm 43 61 67 87
P a g e 59 | 137 Fe % 3.61 4.16 3.92 7.75 Hg ppm 0.11 0.16 0.24 0.14 K % 1.26 1.56 1.30 1.10 Li ppm 39 94 53 16 Mg % 1.54 2.25 2.02 3.21 Mn ppm 779 640 684 1150 Mo ppm 4 6 3 <5 Na % 4.30 4.28 4.25 2.38 Ni ppm 82 93 87 56 P ppm 758 729 746 675 Pb ppm 32 39 56 8 S total % 1.21 1.11 1.07 0.91 S sulphide % 1.11 0.91 0.84 0.61 Sb ppm 2.40 2.45 2.70 0.10 Sr ppm 624 669 626 147 Te ppm 5.4 8.0 4.4 0.4 Ti ppm 2800 3157 3092 4550 V ppm 75 94 91 190 Y ppm <100 <100 <100 <100 Zn ppm 68 108 108 82 Source: St Ives CPR, 2021 Table 10.2.2 and Table 10.2.3 show a summary of the St Ives open pit’s ore samples average head analyses. Observations of the open pit’s ore samples results, potentially relevant to mineral processing, includes the following: Neptune (oxide) – relatively enriched in copper (Cu) and organic carbon. Neptune (fresh) – relatively enriched in copper (Cu), zinc (Zn), and sulphide sulphur (S sulphide). Justice (mixed) – relatively enriched in molybdenum (Mo), nickel (Ni), and lead (Pb). Invincible (mixed) – relatively enriched in antimony (Sb), tellurium (Te), and lead (Pb). Incredible (mixed) – relatively enriched in antimony (Sb), and lead (Pb). Pistol Club (oxide) & Trinidad (mixed) – slight relative enrichment in mercury (Hg). Clifton (mixed) – relatively enriched in copper (Cu) and zinc (Zn).
P a g e 60 | 137 Table 10.2.2: Summary of St Ives open pit mine areas average sample head analyses – 1 of 2 Species UOM Neptune Santa Ana Pistol Club Invincible Pit Justice Incredible Oxide Fresh Mixed Oxide Mixed Mixed Mixed Sample count no. 14 10 6 3 27 10 4 Au ppm 1.74 2.39 12.68 4.91 5.35 3.58 1.46 Ag ppm 0.64 1.06 1.98 0.30 0.99 2.00 0.45 As ppm 32 14 13 17 <5 15 Al % 7.67 11.55 4.48 6.70 5.97 6.93 Ba ppm 188 286 80 993 784 850 Be ppm <20 <5 <20 <20 <5 <20 Bi ppm 20 <10 <25 <25 8 25 C total % 0.40 1.66 0.19 1.19 0.86 1.14 C organic % 0.20 0.08 0.05 0.05 0.04 <0.03 Ca % 0.13 5.79 0.04 2.32 1.69 3.01 Cd ppm <5 <5 <20 <20 <5 <20 Co ppm 56 54 70 30 37 25 Cr ppm 394 336 225 139 750 106 Cu ppm 237 735 112 34 56 65 44 Fe % 5.70 8.57 3.18 3.63 4.02 3.75 Hg ppm 0.12 0.12 0.45 0.11 0.07 0.06 K % 0.46 0.90 0.13 1.02 0.80 1.97 Li ppm 26 18 20 50 19 33 Mg % 1.08 2.61 0.77 1.78 4.59 1.51 Mn ppm 472 632 307 584 409 615 Mo ppm 6 16 <20 <20 1817 <20 Na % 2.72 2.48 2.09 4.44 4.08 2.58 Ni ppm 160 154 170 147 101 354 100 P ppm 245 625 <250 694 930 938 Pb ppm 14 12 <20 112 124 75 S total % 0.87 4.39 0.27 0.88 1.73 0.57 S sulphide % 0.47 3.66 0.01 0.77 1.72 0.47 Sb ppm 0.64 0.31 0.83 41.85 0.30 61.50 Sr ppm 51 219 10 701 233 333 Te ppm 1.2 1.9 <0.2 8.7 3.0 0.4 Ti ppm 3414 2240 4533 2815 2560 3000 V ppm 122 102 142 88 137 83 Y ppm <100 <100 <100 <100 <100 <100 Zn ppm 128 415 57 79 64 71 Source: St Ives CPR, 2021
P a g e 61 | 137 Table 10.2.3: Summary of St Ives open pit mine areas average sample head analyses – 2 of 2 Species UOM Trinidad Swiftsure Delta Island South Clifton Idough East Thunderer Mixed Mixed Mixed Mixed Mixed Mixed Sample count no. 6 7 4 4 3 5 Au ppm 3.10 12.39 3.15 1.13 0.82 3.07 Ag ppm 1.02 1.30 0.26 <2 <0.3 <2 As ppm 8 7 70 35 20 9 Al % 6.29 5.55 6.26 3.46 7.19 7.33 Ba ppm 593 190 240 339 487 281 Be ppm <5 <20 <20 <20 Bi ppm <10 <25 <10 <25 <10 C total % 1.23 0.08 0.66 2.12 1.29 C organic % 0.06 0.07 0.06 0.11 0.09 0.11 Ca % 2.36 1.77 0.21 0.80 3.98 2.29 Cd ppm <5 6 <20 <5 <20 <5 Co ppm 28 47 40 75 60 46 Cr ppm 620 450 200 383 225 340 Cu ppm 63 113 59 541 127 94 Fe % 3.72 4.68 8.26 10.90 7.72 5.21 Hg ppm 0.37 <0.1 0.05 0.09 K % 1.53 1.31 0.65 0.93 1.70 1.15 Li ppm 20 10 20 15 40 21 Mg % 3.38 1.41 3.20 1.56 2.44 2.91 Mn ppm 811 1200 240 395 1367 594 Mo ppm <5 <5 <20 8 <20 6 Na % 2.02 4.54 2.55 0.60 1.46 3.75 Ni ppm 124 232 120 153 107 133 P ppm 600 563 325 292 110 Pb ppm 14 33 <20 50 73 16 S total % 0.30 0.15 0.51 0.50 1.49 S sulphide % 0.26 0.46 0.02 0.38 0.66 1.04 Sb ppm 0.80 0.38 0.75 0.43 5.40 Sr ppm 192 90 20 192 123 156 Te ppm 2.0 0.6 1.9 0.8 1.1 0.7 Ti ppm 2133 1112 3250 1550 4200 2011 V ppm 76 185 151 56 190 143 Y ppm <100 <100 <100 <100 <100 6 Zn ppm 157 55 71 1863 165 62 Source: St Ives CPR, 2021
P a g e 62 | 137 10.2.2 Metallurgical recovery A summary of the number and results of laboratory recovery tests carried out on samples taken from key selected mining areas is shown in Table 10.2.4. The average grades, tails and recoveries for each mining zone data is also shown for reference. Table 10.2.4: Summary of metallurgical samples/tests quantities and summary of average recovery results Mineral reserve Area No. of Samples Tested (1) Average Grade of Samples (2) Average Gravity Recovery Finals Tails Grade Average Total Gold Recovery (3) Lowest Total Gold Recovery Highest Total Gold Recovery Underground Invincible South 31 8.12 49.29 0.37 95.39 86.86 98.44 Invincible Deeps 14 8.21 65.03 0.24 97.03 58.02 99.45 Invincible UG 13 4.37 44.89 0.30 93.24 83.73 97.93 Hamlet North 4 8.64 52.09 0.14 98.34 94.56 98.82 Open Pit Neptune - Oxide 14 2.41 65.61 0.13 94.72 56.01 99.45 Neptune - Sulphide 10 2.46 28.91 0.28 88.80 67.76 97.94 Santa Ana 6 13.49 0.00 0.76 94.38 89.81 96.79 Pistol Club 3 6.12 54.22 0.02 99.70 98.87 99.85 Invincible Pit 27 5.86 40.81 0.19 96.80 92.99 98.89 Justice 10 3.26 33.24 0.25 92.30 86.83 96.34 Incredible 4 2.01 47.67 0.10 95.15 90.66 96.99 Trinidad 6 4.84 60.16 0.12 97.52 92.40 99.80 Swiftsure 7 15.33 81.15 0.67 95.61 95.61 95.61 Delta Island South 4 2.88 81.52 0.01 99.65 97.63 99.87 Clifton 4 1.41 36.24 0.23 83.71 78.69 98.35 Idough East 3 1.32 40.69 0.03 97.48 96.46 98.25 Thunderer 5 2.98 54.70 0.22 92.50 89.20 94.93 Note: 1. For samples where multiple tests carried out at different conditions on a single sample, the result used for this table was selected for conditions considered to most closely match the plant. 2. Grade reported is the back-calculated grade of the sample, based on gold mass balance. 3. This recovery reported is for information and comparative purposes only and is not used for reserves calculations. Reserves are instead calculated on the basis of grade-recovery models. Source: St Ives CPR, 2021 Metallurgical recoveries are applied using recovery models which are informed by testwork and historical processing performance. Some projects contributing to Mineral resources are estimated with a generalised recovery model. Recovery models are derived by visual fitting of the adopted form of model to the metallurgical test results by the site’s Project Metallurgist. Table 10.2.5 lists the contribution of mineralisation sources with the recovery models applied for Mineral reserve or Mineral resource estimation.
P a g e 63 | 137 Table 10.2.5: December 2021 recovery estimation models by ore source Mineral reserve or Exclusive Mineral resource* (excluding stocks) Note Tonnes (kt) Grade Ounces (koz Au) Recovery at average grade Recovery model Note 5 Open pits APN * 3 683 4.73 104 94.84 % Recovery= 0.972 x (Grade - 0.115)/Grade Bondi * 3 166 3.51 19 94.01 % Recovery= 0.972 x (Grade - 0.115)/Grade Clifton 1 191 2.05 13 91.75 % Recovery= 0.922 x (Grade - 0.01)/Grade Idough East * 1 172 1.70 9 92.89 % Recovery= 0.987 x (Grade - 0.1)/Grade Incredible * 1 902 1.34 39 89.29 % Recovery= 0.977 x (Grade - 0.115)/Grade Intrepide * 3 298 2.55 24 92.82 % Recovery= 0.972 x (Grade - 0.115)/Grade Invincible * 1 785 2.75 69 94.94 % Recovery= 0.967 x (Grade - 0.05)/Grade Junction * 3 189 3.38 20 93.89 % Recovery= 0.972 x (Grade - 0.115)/Grade Justice 1 442 2.56 36 93.17 % Recovery= 0.947 x (Grade - 0.0415)/Grade Neptune oxide 1,2 1,598 1.88 96 91.97 % Recovery= 0.977 x (Grade - 0.11)/Grade Neptune fresh 0 1,598 1.88 96 91.21 % Recovery= 0.932 x (Grade - 0.04)/Grade Pistol Club South 1 661 2.56 54 97.56 % Recovery= 0.995 x (Grade - 0.05)/Grade Santa Ana* 2 1,346 2.13 92 91.96 % Recovery= 0.972 x (Grade - 0.115)/Grade Swiftsure 1 285 4.08 37 96.28 % Recovery= 0.987 x (Grade - 0.1)/Grade Thunderer 1,2 246 2.00 16 89.49 % Recovery= 0.957 x (Grade - 0.13)/Grade Trinidad 1 493 2.09 33 93.97 % Recovery= 0.977 x (Grade - 0.08)/Grade Yorick * 3 420 3.41 46 93.92 % Recovery= 0.972 x (Grade - 0.115)/Grade Underground Argo * 1,2 780 4.53 113 94.89 % Recovery= 0.977 x (Grade - 0.13)/Grade Hamlet North 1,2 335 6.44 69 96.49 % Recovery= 0.977 x (Grade - 0.08)/Grade Invincible UG 1,2 1,924 3.71 230 92.77 % Recovery= 0.932 x (Grade - 0.017)/Grade Invincible Deeps 1 3,961 4.29 546 95.71 % Recovery= 0.987 x (Grade - 0.13)/Grade Invincible South 1,2 7,040 5.01 1,135 93.63 % Recovery= 0.9515 x (Grade - 0.08)/Grade North Orchin * 2 1,269 3.85 157 94.00 % Recovery= 0.94 x (Grade - 0)/Grade Sirius * 2 2,977 2.86 274 85.00 % Recovery= 0.85 x (Grade - 0)/Grade Surface Surface Stockpiles 4 2,906 1.56 146 Note: * Projects reported as Mineral resources only. 1. Current testwork program. 2. Historical or current plant performance. 3. Generalised default model. 4. Stockpile recoveries based on recovery models for mine sources. 5. Recovery model maxima are set at 96 % for pit and 95 % for underground. Source: St Ives CPR, 2021 10.2.3 Ore hardness The metallurgical testing program at St Ives includes ore hardness testing, typically being the crushing work index, abrasion index (Ai), Bond BWI (ball work index) and SMC (Steve Morrell Consulting) SAG milling parameters (A, b, Axb, Mia). To estimate mill throughput expectations for future reserve ores from the hardness test results, the Morrell Total Power method is used, which provides an estimate of overall grinding circuit power requirement in kWhr per tonne using the SMC parameters (SAG mill, Mia and Ball mill, Mib) which are calculated from the Bond ball work index (BWI) test and the SMC drop weight index test results. The grouped ore hardness indices and total milling power draw requirement estimates are shown in Table 10.2.6, for a final grind size of 125 um.
P a g e 64 | 137 Table 10.2.6: Summary of rock abrasion and hardness indices averages by deposit for St Ives samples Mineral reserve area Rock SG (t/m³) Abrasion Index, Ai JK drop weight Test, Axb SAG Work Index, Mia (kWhr/t) Bond Ball Work Index (kWhr/t) Ball Work Index, Mib (kWhr/t) Underground Invincible South 2.74 0.26 36.5 21.35 16.0 19.0 Invincible Deeps 2.74 0.12 45.3 17.91 12.6 14.5 Invincible UG 2.74 0.11 41.3 19.15 14.4 16.9 Hamlet North 2.81 0.11 40.9 19.23 11.2 12.4 Underground Neptune – Oxide Neptune – Sulphide Santa Ana 2.56 Pistol Club Invincible Pit 2.84 0.24 68.0 11.7 12.6 Justice 2.45 0.29 131.2 13.05 8.4 9.4 Incredible 2.77 0.16 46.6 19.75 21.7 26.1 Trinidad 2.44 0.10 243.7 10.15 12.6 14.5 Swiftsure 0.10 204.1 14.5 17.4 Delta Island South Clifton 0.18 67.9 11.9 13.4 Idough East 16.4 19.9 Thunderer 45.3 11.2 11.9 Source: St Ives CPR, 2021 From an operational perspective, the installed power capacity of the closed-circuit SAG mill, being 13 MW or 26 kWhr/t at 2021 typical mill throughput rates, exceeds the power requirements of the ores fed by a reasonable margin. Therefore, mill throughput at St Ives is typically not governed or constrained by installed mill power and is instead managed by feed blending on a short to medium term basis, considering mined ore supply availability, ore stockpile levels, material types, gold production targets, and the processing plant’s downstream constraints (e.g., leach/CIP flow rate capacity). As such, currently the ore hardness test results are not used for the purpose of plant feed scheduling, but instead to keep check of the characteristics and mill throughput potential of the future ores as part of the pre-feasibility and feasibility level studies that are compiled and progressively undertaken as the existing mines develop, and new mines are identified. 10.3 Plant Sampling The Lefroy processing plant currently sources ore from several underground and open pit mining operations. Daily composite samples of plant feed and tailings streams are taken to assist in gold accounting on site. These are collected using a combination of automatic sampling stations as well as manual cuts using properly designed samplers. Analysis of the composites includes gold contained in solids, solution, and carbon. The analysis of samples used for accounting purposes is conducted by ALS Kalgoorlie. Solid sample composites are analysed using fire assay with an AAS finish. Carbon sample composites are assayed using high temperature ashing, acid digest and an AAS finish. Solution sample composites are assayed using DIBK extraction and an AAS finish. All laboratory assaying procedures are aligned with standard industry practices. Bullion samples are taken when required by vacuum sampling from each gold pour. These samples are used as an estimate prior to receiving official outturn assays provided by the Perth Mint. Gold shipments occur on a regular basis to minimise gold stocks held on site. All gold shipments are conducted by a registered security company in a completely secure environment inside the gold room.
P a g e 65 | 137 In accordance with Gold Fields Plant Metal Accounting Standard, a gold in circuit survey is undertaken monthly to reconcile (by mass balance) and compare the back-calculated gold grade of the mill feed with the mill feed grade estimates obtained using plant samples and assays. The monthly variance between the assayed grade and the reconciled grade is monitored, and an investigation is required to be carried out if this variance exceeds the minimum allowable levels outlined in the Gold Fields Plant Metal Accounting Standard. 10.4 Deleterious Elements The testwork procedures include analysis for elements that could be deleterious to plant recovery (e.g., base metals, arsenic, tellurium, antimony, organic carbon). The following sections describe how St Ives manages specific deleterious elements. Cyanide-soluble Copper Relatively higher concentrations of cyanide-soluble copper can be problematic to a gold leach/CIP plant, due to consumption of cyanide by the copper, and the generation of high concentrations of weak-acid dissociable (WAD) cyanide (CN) levels in plant tailings. Some of the deposits at St Ives are enriched in cyanide soluble base metals, such as copper. There are specific known areas of problematic copper concentrations, including the Kapai Slate stratigraphic unit. This unit is intersected in Neptune (Stages 1, 2 and 5) pit. The spatial location of this geological unit is known, and ores sourced from this area are separately stockpiled and lightly blended into the plant feed, to avoid problems with free cyanide concentrations and tailings weak-acid dissociable (WAD) cyanide (CN) levels exceeding those permitted under the International Cyanide Management Code (ICMC). In 2019, St Ives commissioned a new INCO partial tailings cyanide detoxification circuit to help manage tailings WAD CN levels and permit ores with high cyanide soluble copper to be safely blended into plant feed. The St Ives geological department checks exploration samples for cyanide-soluble copper as a precautionary measure. Mercury Some minor enrichment in mercury is evident in sections of the Pistol Club and Trinidad open pits, however the measured concentrations still average less than 1 ppm within the metallurgical samples. Gold room technicians are regularly tested for mercury (and arsenic) as a precautionary measure. Viscous Clays Some of the clays associated with the oxidised sections of the open pits can be problematic to slurry viscosity which reduces flowrate through the plant’s trash screens and CIP interstage screens, which can then limit plant overall capacity. The mining areas and ores containing problematic clays are known, and these ores are separately stockpiled, to allow controlled blending into plant feed. The future ore’s testwork program includes slurry viscosity testing on oxide samples to guide the site metallurgists to judge the need to blend, or otherwise. Pyrrhotite (and other reactive sulphides) Some of the fresh ores (particularly Neptune pit) are known to contain elevated concentrations of reactive sulphides, such as pyrrhotite. If proportionately too much of such ores are included in the plant feed blend, the leaching circuits dissolved oxygen levels become too low, and gold recoveries are subsequently reduced. Like dealing with cyanide-soluble copper and viscous clays, for St Ives the solution to this deleterious species is blending which aims to ensure that the plant’s oxygen supply capacity can meet the demand by the blended feed.
P a g e 66 | 137 Preg-robbing carbonaceous materials The Black Flag stratigraphic unit that runs through the St Ives leases is known to contain preg-robbing carbonaceous zones in places, that can be detrimental to gold recovery through a leach/CIP processing plant. The location of the carbonaceous zones within the Black Flag unit is known to St Ives geology and is not known to be associated with the existing reserves. Carbonaceous materials are also known to be associated with the Paleochannel units; however, this natural carbon is considered as being inactive and does not show the observable ability to irreversibly preg-rob cyanide-soluble gold in the plant. Such ores have been processed for many years at St Ives without demonstrable deleterious impacts. 10.5 Metallurgical Risks In the opinion of the Qualified person, the combination of a well-established processing plant with a known operating history of treating ores mined from the associated mining leases, together with the ongoing and active metallurgical testwork program assessing core samples selected from future local mineralisation areas, provides a reasonable platform for estimating the associated metallurgical and processing modifying factors underpinning the 2021 reserves. However, the reader should be aware that uncertainties remain, and some key potential areas of risk and uncertainty are discussed in the following sections. 10.5.1 Sample Representativity Metallurgical sample selection is an important aspect of the process of developing resources into reserves. The results of the testwork undertaken on those samples are often used directly as input into plant performance estimates that are then used for the life of mine and reserve’s financial evaluations. It is important that the metallurgical samples are representatively selected, for example, to cover a suitable range of gold head grades, to consider the different geological lithologies and domains expected to be encountered, and to appropriately incorporate internal and external material dilution expected during the mining process. Individually testing different head grades ranges and geological domains improves the ability to see the metallurgical response variability of the orebody, which improves the ability to make better judgements and estimates about how the material could perform in the processing plant. As new potentially economic mineralised areas are identified at the mine, the site’s exploration geologists and metallurgists will select a few, to several, core composite samples of each new mineralisation area, and submit to a commercial metallurgical laboratory for the undertaking of a defined testwork program including, head assays, recovery, and physical properties analyses. Whilst effort and care are taken with the sample selection process, there are practical constraints to samples numbers due to core availability and overall testwork cost, and therefore it is not possible for the Qualified person to guarantee that the proposed reserves have been fully representatively sampled, and therefore some inherent uncertainty will remain. 10.5.2 Laboratory Test Methods and Scale-up The laboratory test results require scale-up to estimate performance through the industrial processing facility. The metallurgical testing regime adopted has been specifically tailored to provide results that reasonably and practically represent the actual installed processing facility. This regime has been developed from experience gained over many years of undertaking such work, culminating in eventual mining, and processing of ores that have been historically metallurgically tested. Gravity and leach recoveries achieved in the laboratory are assumed to be achievable within the plant. Overall laboratory recovery results are typically model-fitted to a bounded head grade relationship, and this resulting model is assumed to be reasonably achievable at plant scale. Hardness properties are applied to the Morrell Total Power method to estimate grinding mill throughputs.
P a g e 67 | 137 However there remains potential risk associated with the delivery of these metallurgical testing results associated with the differences between laboratory methods and full-scale processes, and miscellaneous and unidentified errors associated with undertaking the testing. The selected laboratory (ALS Metallurgy, Balcatta, Western Australia) that is undertaking the metallurgical testwork is highly regarded within the local gold mining industry, and has an established history of performing well, with both Gold Fields and the Qualified person. No pilot-plant testing is carried out prior to reserve declaration and subsequent mining, and the metallurgical properties are based on bench scale test results only. The sample requirements and cost for pilot testing are considered as being prohibitive. However, given the relative simplicity of the St Ives processing facility, a history of successful operation, and in being consistent with practices adopted for other similar operations, it is the opinion of the Qualified person that pilot plant testing is not required for the estimation of plant modifying factors for the 2021 reserves. Despite reasonable efforts and care in the application of scale-up factors and modeling methods, there remains some inherent uncertainty in actual performance of the industrial facility predicted from a small volume of small-scale laboratory tests. One of the key challenges in confirming scale-up is the practice of ore blending of the plant feed (undertaken to optimise overall performance of the plant) which can limit the quality of regular direct comparison of plant performance and laboratory test results over the longer term. 10.5.3 Deleterious Elements The routine metallurgical testwork program includes detailed head analysis (multi-element ICP-MS scan) to check for quantities of potentially deleterious elements to the plant, such as mercury, arsenic, organic carbon, antimony, tellurium, base metals, etc. Whilst this assessment is carried out on the limited number of metallurgical composite samples, it is not typically undertaken on individual exploration samples. The multi-elemental assay results obtained from the metallurgical samples are used as a guide to identify if there are any deleterious elements at concentrations that would be of reasonable concern that could materially impact plant performance. If such a species is identified then the option to submit a larger number of individual exploration samples for detailed analysis, to better quantify and locate the deleterious species, is readily available. However, it needs to be recognised that the relatively low number of metallurgical samples initially checked for deleterious elements means that some inherent risk remains of unexpectedly encountering such a species during subsequent mining and processing operations, despite such elements not being identified during metallurgical testing.
P a g e 68 | 137 11 Mineral resource estimates St Ives uses Datamine Studio RM (Release 1.3.35) as the primary geological modelling and Mineral resource estimation software. The geological interpretation is supported by Leapfrog Geo® and the resource estimation by ISATIS® and Snowden Supervisor® software. St Ives’s Mineral resources undergo an initial assessment through the application of a range of assumed technical and economic factors to ensure reasonable prospects for economic extraction. The in-situ cutoff grade has modifying factors applied and all material within the pit shell or MSO shape above the calculated cutoff grade is judged to have reasonable prospects for economic extraction. The Mineral resources are 100 % attributable to Gold Fields and are net of production depletion up to 31 December 2021. The point of reference for the Mineral resources is in-situ over a minimum mining width with dilution applied. Open pit Mineral resources are confined to pit shells and underground Mineral resources are constrained to a practical mining shape and a minimum mining width. 11.1 Mineral resources estimation criteria 11.1.1 Geological model and interpretation Historical interpretation was via plans, cross sections, oblique sections and long sections/projections plotted on site in appropriate orientations and spacing for each project. While this is still encouraged new technology is generally favoured to interpretate directly into the computer using appropriate views and software. Geological interpretations are routinely reviewed by senior geologists, corporate consultants and external auditors to ensure they are appropriate and technically sound. Consideration will be given for some or all of the following elements: Validated de-surveyed sampling data with geological logging and grade information plotted downhole. Topography. Mining excavations. Material type profiles (base of cover, base of oxidation, top of fresh rock). Existing geological information (lithology, structure, mineralisation). Block model information. Planned mining information (development/stope shapes or pit designs/ore block mark outs). Survey information (stations, lasers). Geological mapping is used in conjunction with other available data used as the foundation for the geological interpretations. Where used, mapping data is georeferenced to ensure spatial correctness. These interpretations include but are not limited to alteration type and intensity, lithological host, structural orientation and quartz vein presence and abundance. The information is loaded into spatial packages such as Leapfrog Geo® and Datamine® which visually plot multiple data sets simultaneously. This process, in combination with the regional geological understanding, provides the basis for producing reliable geological models. The mineralisation modelling process (3D wireframing of geology) uses intersection width within the modelled data, regardless of drill angle intersection. Geological features, including topography, regolith, rock type and gold mineralisation are modelled using digital terrain models (DTM) and wireframes. In active open pit and underground operations, surveys of exposed geological features are incorporated into the models. All models are constrained by geological boundaries and where relevant, by surveys of existing open pit and underground excavations. Geological interpretation and resource modelling at St Ives is an iterative process that evolves as new data and ideas become available. Generally, only one interpretation is submitted for resource model evaluation and is the interpretation that most geologists would support. This is confirmed by ongoing peer, corporate and external audits and reviews, which support the existing methodologies and processes while suggesting small improvements.
P a g e 69 | 137 11.1.2 Block modelling 3D block models are used to represent the volume of the in-situ mineralisation and are constructed based on the geological interpretations. Volume is constrained by the wireframes and the block models utilises sub-celling to ensure the block model volume closely represents the volume of the wireframe model. The parent cell size applied in resource modelling at St Ives is dependent on the style of mineralisation, the selective mining unit and the drill spacing. Parent cells used for open pit resource models generally range from 20 m x 20 m x 5 m to 5 m x 10 m x 5 m. The underground parent cell size varies mostly from 20 m x 20 m x 5 m to 10 m x 10 m x 5 m. Sub-celling is set to 1 m where practical. Examples of the dominant parent cell and sub-cell block sizes used for each resource model are listed in Table 11.1.1. 11.1.1 Compositing and domaining The sample data is composited to regular intervals prior to estimation. This ensures that a consistent sample support is applied to the estimation. Samples, predominantly from Diamond and Reverse circulation drilling are composited to one metre intervals for broad mineralised zones which typically approximates the sample widths applied. For some narrow mineralised lodes, compositing may be applied to full lode width and the length corrected to reflect the true width across the lode. The composite length is a function of sample spacing, data variance, deposit characteristics, parent cell size and mining method. The compositing method ensures no residual small lengths are created and that no sample portion is omitted. The composited output drillhole assay file is coded by mineralised domain as defined by wireframe boundaries. Domaining is based on geological characteristics and a detailed investigation using histograms, cumulative histograms or probability plots is necessary to support the division into domains or sub-domains. The data from a domain is verified to make sure it can be treated to belong to one statistical distribution. Additional sub-domains are added where the distinct grade populations exist within the broader interpretation domains. Bulk density Bulk densities are assigned by domain as disclosed in Section 7.5. 11.1.2 Top cuts The objective of top cutting is to either cap the grades (where values above a selected cutoff grade are reset to this cutoff), restrict the search (where the influence of high grades is restricted during estimation) or a combination of both. Summary statistics are generated for all domains and analysed for existence of extreme grades. Top cut analysis is carried out on composited data by reviewing population histograms, probability plots, mean and variance plots and the spatial distribution of each domain. A coefficient of variation (CV) value >1.5 normally signals the existence of outlier values and indicates the need for investigating and applying a top cut on the data or employing a sub domain strategy. Consideration is always given to the cut percentile and the cut mean compared to the uncut mean. The difference between the mean values is usually within 10 %. 11.1.3 Variography To determine the spatial continuity of the mineralisation, variogram analysis is carried out on composited data for each domain. The process starts by understanding the major mineralisation directions as interpreted from the geological model. Thereafter the continuity analysis involves evaluating a series of fans in three principal directions (horizontal, across-strike vertical and dip planes). The fans are used to generate variogram contours that are used to select the direction of maximum continuity. Each direction is used to determine the placement of the next plane. The selected strike, dip and plunge directions are used to locate the three orientations for which experimental variograms are produced. The nugget variance is modelled against the downhole experimental variogram. The principal direction is modelled by generally fitting a nested spherical model to the experimental variogram. The other two minor directions are modelled last. To provide a better understanding of the underlying spatial model, extreme values are cut to remove unnecessary noise and/or the model is transformed into gaussian space. The variance values are normalised to a sill, which represents the population variance, and where transformed variograms are modelled, the back transformed parameters are used in estimation. This variogram model forms the basis of various estimation methods to represent the correlation between grades and the expected variability of grades.
P a g e 70 | 137 The modelled variability, particularly the direction, is tested against the geological interpretation to cross validate. This ensures geological understanding is the primary basis for determining spatial continuity. The Qualified person’s opinion is that the variographies are practical reflection of the spatial continuity of the respective mineralization grades and their application to the geostatistical analysis is adequate to minimize uncertainty and to derive appropriate resource block models for use by the planning engineers to complete mine design and production scheduling 11.1.4 Grade estimation Grade estimation techniques such as ordinary Kriging (OK) and Simple Kriging are utilised at St Ives (Table 11.1.1). The grade estimation technique is selected based on the geological model, data spacing and variance, and statistical analysis of the grade data. The directional ranges determined from the variography analysis are used to guide the search distances applied during estimation. The ranges are also used as an aid in resource classification. Generally, if mineralisation is interpreted as open beyond the data extremities and providing there is geological support, the model will be extrapolated and extended beyond this data by a maximum of half the drillhole spacing. This portion will be appropriately classified. A multiple pass approach is used for grade interpolation within the estimation domains. The first pass uses the optimised search parameters for the lode at the nominal drill spacing as summarised in Table 11.1.1. With each subsequent pass, the minimum number of samples is reduced, and the search volume is increased. This approach enables most blocks to receive a grade estimate within the domains. Octant searches are applied in some areas adjacent to underground development to mitigate sample clustering within the development. Grades are estimated into block sizes (parent cells) optimised with respect to the nominal drill spacing. Dimensions of the parent cells are typically half to one quarter of the distance between drillholes at the nominal drill spacing. The parent cells are sub-celled to represent the volume within the domain. Different parent cells sizes are used in a model where there are distinct areas with different drill spacings. Any model cells unsupported by data beyond the ranges of the variogram / search ellipse are not included in the Mineral resource estimate. The relationship between domains is assessed to determine how they are used during grade interpolation. Distinct domains utilise hard grade boundaries during interpolation. Where domains share similar gold distribution characteristics, a soft or gradational boundary is typically used for interpolation. St Ives is a gold-only mine and as such no correlations between elements are made for Mineral resource estimation. However, correlations of multi-element data are used to help classify different rock units for stratigraphic identification purposes. The grade estimation techniques by resource model are presented in Table 11.1.1.
P a g e 71 | 137 Table 11.1.1: Summary of December 2021 Mineral resource estimation parameters Resource model Search Optimised search angles Parent cell size (X, Y, Z) Sub-cell max. size (X, Y, Z) Estimation Estimate sample type Composite length Top cuts Date invsep21a (Fenton) SDIST1 = 111 SANGLE1 = 55 20, 20, 12 (Waste) 20, 20, 12 3D OK & SK Surface RC 1 m 0.7–95 g/t 21/09/2021 SDIST1 = 84 SANGLE2 = 105 10, 20, 6 (EXP) Surface DD SDIST1 = 15 SANGLE3 = -10 10, 10, 6 (MD) UG DD 5, 5, 3 (GC) Faces invsep21a (Deeps) SDIST1 = 69 SANGLE1 = -130 20. 20, 12 (Waste) 20, 20, 12 3D OK & SK Surface RC 1 m 21-70 g/t 21/09/2021 SDIST1 = 46 SANGLE2 = 65 10, 20, 6 (EXP) Surface DD SDIST1 = 15 SANGLE3 = -155 10, 10, 6 (MD) UG DD 5, 5, 3 (GC) Faces isoct21a Invincible South SDIST1 = 86 SANGLE1 = -130 10, 20, 20 (Waste) 10, 20,20 3D OK & SK Surface RC 1 m 13-160 g/t 05/11/2021 SDIST1 = 35 SANGLE2 = 70 5, 20, 10 (EXP) Surface DD SDIST1 = 20 SANGLE3 = -150 5, 10, 10 (MD) UG DD 5, 5, 5 (GC) Faces ssaug20a Swiftsure SDIST1 = 39 SANGLE1 = 85 20, 20, 10 (Waste) 20, 20, 10 3D OK & SK Surface RC 1 m 3-45 g/t 25/08/2020 SDIST1 = 22 SANGLE2 = 5 10, 10, 5 (EXP) Surface DD SDIST1 = 20 SANGLE3 = -155 5, 10, 5 (MD) 5, 5, 5 (GC) Hnsep21a Hamlet North SDIST1 = 73 SANGLE1 = 85 10, 20, 20 (waste) 10, 20, 20 3D OK Surface DD 1 m 14-170 g/t 20/09/2021 SDIST1 = 22 SANGLE2 = 5 10, 20, 20 (EXP) UG DD SDIST1 = 20 SANGLE3 = -155 10, 10, 10 (MD) Faces 5, 5, 5 (GC) Gn1021a Neptune SDIST1 = 73 SANGLE1 = 85 20,20,5 (Waste) 20, 20, 5 3D OK & SK 2D Accumulation OK Surface AC 1 m Full Length 8-103 g/t 20/10/2020 SDIST1 = 22 SANGLE2 = 5 20, 20, 5 (EXP) Surface RC SDIST1 = 20 SANGLE3 = -155 10, 10, 5 (MD) Surface DD 5, 5, 5 (GC) Sonic Note: 1. Only Resource models with significant ounce contribution are listed above. 2. Estimation parameters are for main representative lodes only. Source: St Ives CPR, 2021 The Qualified person’s opinion is that the variography criteria and application to the geostatistical analysis is adequate to minimise errors and to derive appropriate resource block models for use by the planning engineers. 11.1.5 Selective mining units The selective mining unit (SMU) size (i.e. the smallest volume of material on which ore and waste classification is determined) varies from approximately 2.5 m x 5 m x 2.5 m to 5 m x 10 m x 5 m in open pit operations, and from 3 m x 10 m x 20 m to 10 m x 20 m x 10 m in underground operations, depending on the scale of mineralised zones. 11.1.6 Model validation An established formal protocol for checking and validating models in in place at St Ives. The relevant geologist will complete the geological interpretation and resource model which is then reviewed and discussed with the senior staff member responsible for that area. Following any changes and modifications, the geology and associated resource model is formally peer reviewed. Any improvements arising from the peer review are updated prior to the model release. Visual inspection and documented model reconciliations and reporting are the main procedures employed. This includes a review of sections and plans where models are checked for proper coding of drillhole intervals and block model cells. Interpolated grades are examined relative to drillhole composite values. Other model validation checks carried out include: Wireframe vs. block model volume checks.
P a g e 72 | 137 Comparative statistics. Global bias and local trends in the estimate. Comparative checks of grades between other interpolation methods. Comparison of composite vs. block model mean grades. Swath plots. Global change of support. Analysis of estimation quality (Including Kriging efficiency and slope of regression). The results of the peer reviews are formally documented, and a final model change authorisation is completed with all relevant parties signing off. Internal corporate and regional reviewers will visit the site and formally review selected models with material changes. The implementation of past recommendations is also reviewed. All files used for the resource models are stored in a dedicated project folder according to a formalised system incorporating naming protocols. Copies of peer reviews and model change authorisation forms are stored in a centralised electronic library for quarterly and annual review. St Ives also has an extensive and proactive grade control and reconciliation process to review operational planning against actual performance. This encompasses model performance, dilution, mining mix and grade distributions and are comprehensively tracked and managed for each individual mining operation on site. Monthly reports are compiled as part of monthly reviews, as well as tracking of the mine call factor and ore sources and submitted to corporate. 11.1.7 Cutoff grades Cutoff grades for Mineral resources are based on St Ives’ current planning assumptions, updated annually, which are the best available estimates for forecast costs and metallurgical recoveries at the time of calculation. Gold price assumptions are provided by Gold Fields Technical Services. Open pit Cutoff grades are applied to modelled inventories constrained by mine planning processes, including pit optimisation. The cutoff grades used for the open pit Mineral resources at St Ives by area are summarised in Table 11.1.2. Table 11.1.2: Open pit resource cutoff grades Area Resource cutoff grade (g/t Au) RoM Mining recovery (%) Mining dilution (%) Resource cutoff grade (g/t Au) In-situ APN 0.67 100 52 1.02 Bondi 0.68 98 50 1.02 Clifton 0.60 99 25 0.75 Delta Is South 0.55 95 37 0.75 Idough 0.63 99 25 0.79 Incredible 0.68 98 5 0.71 Intrepide West 0.66 99 25 0.83 Invincible 0.61 99 25 0.76 Junction 0.68 95 37 0.93 Justice 0.60 99 25 0.75 Neptune LS OX 0.66 100 52 1.00 Neptune fresh 0.60 95 37 0.82 Pistol Club 0.62 100 52 0.94
P a g e 73 | 137 Area Resource cutoff grade (g/t Au) RoM Mining recovery (%) Mining dilution (%) Resource cutoff grade (g/t Au) In-situ Santa Ana 0.67 96 24 0.83 Swiftsure 0.63 99 25 0.79 Thunderer 0.68 99 25 0.85 Trinidad 0.63 99 25 0.79 Yorick 0.69 100 52 1.05 Note: Historical stockpiles excluded. Source: St Ives CPR, 2021 The cutoff grade is calculated using the following formula: [Ore Premium Mining Costs ($/t) + Process Costs ($/t) + Site G&A Costs ($/t)] [Price x (100 % - Ad valorem Royalty Rate) – All product related costs] x PRF x MCF x 0.03215075 Where: Ore Premium Mining Costs cover adjustments in ore haulage distances and differences in ore and waste drill and blast costs. All other mining costs are accounted for during the pit shell generation phase. Process Costs including sustaining capital. Site G&A Costs including off-site general and administration (G&A) costs directly related to site (e.g. accounting or payroll services). Price is the gold price per ounce ($1,500/oz). The ad valorem Royalty Rate is 2.5 %. All product related costs include management fees, refining costs and contributions to the Gold Fields Foundation per ounce. PRF is the plant recovery factor or metallurgical recovery as a percentage estimated at a grade close to the cutoff grade. MCF is the mine call factor or the percentage of actual mill produced metal against the claim of metal produced. 0.03215075 is the ratio of troy ounces per gram. All material within the pit shell above the calculated cutoff grade is judged to have reasonable prospects for economic extraction. Underground The cutoff grades for the underground Mineral resources at St Ives by area are summarised in Table 11.1.3. Table 11.1.3: Underground resource cutoff grades Area Resource cutoff grade (g/t Au) RoM Minimum mining width (m) Mining recovery (%) Mining dilution (%) Resource cutoff grade (g/t Au) In-situ Argo 2.6 3.0 90 20 3.2 Hamlet north 3.1 3.0 90 24 3.8 Invincible 2.2 3.0 93 19 2.6 Invincible South 2.2 3.0 93 17 2.6 Invincible South (Deeps) 2.5 3.0 93 17 3.0
P a g e 74 | 137 Invincible Deeps 2.5 3.0 93 18 3.0 North Orchin 2.0 3.0 95 19 2.4 Sirius 1.7 3.0 97 12 1.9 Source: St Ives CPR, 2021 The underground Mineral resource estimates are evaluated using the same formula and gold price of $1,500/oz. [Mining Costs ($/t) + Process Costs ($/t) + Site G&A Costs ($/t)] [Price x (100 % - Ad valorem Royalty Rate) – All product related costs] x PRF x MCF x Where: Mining Costs take account the mining method and area being mined inclusive of secondary development and sustaining capital. The cutoff grade is applied to the deposit model as part of the assessment in relation to minimum mining width and reasonable prospects of extraction. Minimum mining width and reasonable extraction are assessed using a mineable shape optimiser (MSO) routine available in Datamine Studio RM software. This routine generates a series of shapes related to a nominated SMU and a minimum width to maintain an average grade within the shape above the nominated cutoff grade. The SMU and minimum mining width are specified in line with current mining practices at St Ives. MSO shapes are removed where they are judged too isolated and unlikely to be eventually economically extracted. This leaves a contiguous set of shapes. Small amounts of material below cutoff within the boundaries of the contiguous set of shapes are evaluated to determine if they would be extracted as part of a mining sequence. When close to existing mining areas, a further assessment is made to ensure that material is potentially extractable. Remnant mining areas are coded using a stand-off distance to existing stopes. Mineralisation inside the stand-off zones is not reported as a Mineral resource except where an engineering assessment has resulted in the design and potential extraction of planned stopes. All material within the retained MSO shapes above the calculated cutoff grade is judged to have reasonable prospects for economic extraction and may include some material below the cutoff grade that is extracted as part of the sequence to mine the higher grade (above cutoff) material. Gold Fields conducts an annual review of metal prices for Mineral resource and Mineral reserve reporting to monitor any significant changes that would warrant re-calibrating the price deck for strategic and business planning purposes. This review takes into account prevailing economic, commodity price and exchange rate trends, together with market consensus forecasts, including from global industry analysts and financial institutions, as well as Gold Fields’ strategy and expectations for the mine operations. The Mineral resource and Mineral reserve gold prices have been selected and justified by the Qualified person at $1,500/oz per troy ounce (oz) for resource and at $1,300 per troy ounce (oz) for reserve (life of mine planning and reserve techno-economic modelling). This metal price deck has also been reviewed and endorsed by the Company executive team. For more information on the rationale applied to deriving the Mineral resource and Mineral reserve metal price deck refer to chapter 16. The selected resource gold price of $1,500/oz is at a 15 % premium to the reserve price with the differential being in general alignment with Gold Fields standard practice for setting the Mineral resource price. The 15 % premium on resources is to provide useful information on the sites resource potential and its impact at higher gold prices and to indicate possible future site infrastructure, permitting, licencing, mining footprint and tailings and waste storage requirements. This information is important to determine the Reasonable prospects of economic extraction for the Mineral resources.
P a g e 75 | 137 The Qualified person has concluded that reasonable prospects for economic extraction have been demonstrated through the application of an appropriate level of consideration of the potential viability of the Mineral resources. These considerations include a reasoned assessment of the geological, engineering (including mining and processing parameters), metallurgical, legal, infrastructural, environmental, marketing, socio-political and economic assumptions which, in the opinion of the Qualified person, are likely to influence the prospect of economic extraction. 11.1.8 Reasonable prospects of economic extraction St Ives Mineral resources are based on an initial assessment at the resource gold price of $1,500/oz using mine optimisation processes. The evaluation includes assessment of the geological, engineering (including mining and processing parameters), metallurgical, legal, infrastructural, environmental, marketing, socio-political and economic assumptions which, in the opinion of the Qualified person, are likely to influence the prospect of economic extraction. Mineral resources are declared based on their economic optimisation at the Mineral resource gold and based on cost estimates and other modifying factors (geotechnical factors, mining dilution, mining recovery, processing recovery and royalties). Although all permitting may not be finalised for some Mineral resources, there is no reason to expect that these permits will not be granted based on existing processes and protocols. The Qualified person has concluded that reasonable prospects for economic extraction has been demonstrated through the application of an appropriate level of consideration of the potential viability of Mineral resources. Mineralisation that has not demonstrated reasonable prospects for economic extraction is excluded from the Mineral resource statement. Although all permitting may not be finalised for some Mineral resources, there is no reason to expect that these permits will not be granted based on existing processes and protocols. 11.1.9 Classification criteria St Ives’ in-situ Mineral resources are classified as either measured, indicated or inferred in accordance with the definitions in Subpart 229.1300 of Regulation S-K. The Mineral resources at St Ives are classified as Measured, Indicated and Inferred as defined in the SAMREC (2016) Code. Increasing levels of geo-scientific knowledge and confidence are generally based on geological understanding, grade variance, drillhole/sample spacing, mining development (amount of exposed and mapped mineralisation) and mining history. Increasing levels of geo-scientific knowledge and confidence are generally based on geological understanding, grade variance, drillhole/sample spacing, mining development (amount of exposed and mapped mineralisation) and mining history. The quality of the estimate is also considered and is based on the values and spatial distribution of kriging efficiency and slope of regression calculated during kriging. In general, the following criteria are used as a guide to definition of resource classification: Measured Mineral resources: o Underground – minimum 15 m x 15 m DD hole spacing, developed, mapped and face and/or wall sampled. RC drilling may also be used, depending on the depth. o Open pit – 10 m x 5 m spacing for most of the pits with some 10 m x10 m and up to 20 m x 20 m RC drill spacing supported by mapping and additional sonic drilling information where available. Dedicated aircore drilling may also be used to infill near surface regolith style mineralisation. A variety of drill methods will typically be used and statistically compared to ensure no sample bias between methods. Potential core recovery issues may limit the application of diamond drilling in highly broken or weathered near surface areas. Indicated Mineral resources: o Minimum drill spacing of 40 m x 20 m to 80 m x 80 m depending on geological and grade continuity.
P a g e 76 | 137 o If near surface, RC drilling may be supplemented with dedicated aircore and/or sonic drilling. Inferred Mineral resources: o Minimum drill spacing of 40 m x 40 m to 110 m x 11 m depending on geological and grade continuity. Surface stockpiles include short term run-of-mine (RoM) and longer term low-grade stockpiles. Stockpiles are reported based on pre-mining grade control and survey data, supported by monthly mine reconciliation processes at the time of mining. Surface stocks are therefore classified as a measured Mineral resource. Increased drilling density improves confidence in geological understanding and grade distribution. Some drill methods are more suited to certain styles of mineralisation and a combination of methods is generally used to understand and reduce the risk of sample bias. Advanced estimation techniques such as Simulation are used where possible to assist the process of identifying and quantifying risk. A higher resource category (eg. Measured) assumes a lower risk of actual variance against model estimates. The Qualified person is of the opinion that: a) Inferred Mineral resource has an even chance of converting to indicated Mineral resource with continued exploration, additional empirical data and evolving geoscientific modelling. b) The Mineral resource demonstrates reasonable prospects for economic extraction over the indicated study time frame c) The Mineral resource gold price of $1,500/oz is at a 15 % premium to the reserve price with the differential being in general alignment with Gold Fields standard practice for setting Mineral resource price. The 15 % premium is to provide information on St Ives resource potential at higher gold prices and to indicate possible future site infrastructure, permitting, licencing, SLO, mining footprint and infrastructure requirements. d) The Qualified person’s opinion is that, whilst effort and care are taken with the resource estimation and classification processes, increase in geological knowledge and available data will reduce the level of uncertainty, and therefore some inherent uncertainty will remain 11.2 Mineral resources as of 31 December 2021 St Ives Mineral resources exclusive of Mineral reserves as at 31 December 2021 are summarised in Table 11.2.1. The Mineral resources are 100 % attributable to Gold Fields and are net of production depletion up to 31 December 2021.
P a g e 77 | 137 Table 11.2.1: St Ives – summary of gold Mineral resources at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,500/oz Resources (exclusive of Mineral reserves) Cutoff grades/ (g/t Au) Metallurgical recovery/ (%) Amount/ (kt) Grades/ (g/t Au) Amount/ (koz Au) Underground Mineral resources UG measured Mineral resources 542 4.4 77 1.9 to 3.8 85 % to 96.6 % UG indicated Mineral resources 4,713 4.0 602 1.9 to 3.8 85 % to 96.6 % UG measured + indicated Mineral resources 5,255 4.0 678 1.9 to 3.8 85 % to 96.6 % UG inferred Mineral resources 7,990 4.3 1,093 1.9 to 3.8 85 % to 96.6 % Open Pit Mineral resources OP measured Mineral resources 674 2.9 64 0.71 to 1.05 89.3 % to 97.7 % OP indicated Mineral resources 4,665 2.3 350 0.71 to 1.05 89.3 % to 97.7 % OP measured + indicated Mineral resources 5,339 2.4 414 0.71 to 1.05 89.3 % to 97.7 % OP inferred Mineral resources 1,806 2.7 158 0.71 to 1.05 89.3 % to 97.7 % Total St Ives Mineral resources Total measured Mineral resources 1,216 3.6 140 Total indicated Mineral resources 9,378 3.2 952 Total measured + indicated Mineral resources 10,594 3.2 1,092 Total inferred Mineral resources 9,796 4.0 1,252 Notes: a) Rounding of figures may result in minor computational discrepancies. b) Refer to Table 12.5.1 for year-on-year Mineral reserve comparison. c) Quoted as mill delivered metric tonnes and run-of-mine (RoM) grades, inclusive of all mining dilutions and gold losses except mill recovery. Metallurgical recovery factors have not been applied to the reserve figures. The metallurgical recovery is the ratio, expressed as a percentage, of the mass of the specific mineral product recovered from ore treated at the process plant to its total specific mineral content before treatment. The recoveries for St Ives vary according to the mix of the source material (e.g. oxide, transitional fresh and ore type blend) and method of treatment. d) The metal prices used for the 2021 LoM Mineral reserves are based on a gold price of $1,300 per ounce (at an exchange rate of A$1:$0.74). Open pit Mineral reserves at St Ives are based on optimised pits and the underground operations on appropriate mine design and extraction schedules. The gold price used for Mineral reserves is detailed in particularity in Chapter 16 Marketing. e) Dilution relates to planned and unplanned waste and/or low-grade material being mined and delivered to the process plant. Ranges are given for those operations that have multiple orebody styles and mining methodologies. The mine dilution factors are 5 % to 52 % (open pit) and 5 % to 57 % (underground). f) The mining recovery factor relates to the proportion or percentage of ore mined from the defined orebody at the gold price used for the declaration of Mineral reserves. This percentage will vary from mining area to mining area and reflects planned and scheduled reserves against actual tonnes, grade and metal mined, with all modifying factors, mining constraints and pillar discounts applied. The mining recovery factors are 90 % to 93 % (underground) and 91 % to 100 % (open pit). g) The cutoff grade may vary per shaft, open pit or underground mine, depending on the respective costs, depletion schedule, ore type, expected mining dilution and expected mining recovery. The average or range of cutoff grade values applied in the planning process are: St Ives 2.5 g/t to 3.5 g/t Au mill feed (underground) and 0.35 g/t to 0.40 g/t Au (open pit). h) An ounces-based Mine Call Factor (metal called for over metal accounted for) determined primarily on historic performance but also on realistic planned improvements where appropriate is applied to the Mineral reserves. A Mine Call Factor of 100 % has been applied at St Ives. i) The Mineral reserves are estimated at a point in time and can be affected by changes in the gold price, US Dollar currency exchange rates, permitting, legislation, costs and operating parameters. j) St Ives is 100 % attributable to Gold Fields and is entitled to mine all declared material located within the properties mineral leases and all necessary statutory mining authorisations and permits are in place or have reasonable expectation of being granted. Source: St Ives CPR, 2021 The Mineral resources are exclusive of Mineral reserves and the point of reference for the tonnages and grades is in- situ. Open pit Mineral resources are confined to $1,500 per ounce pit shells that are defined by the price, costs and relevant modifying factors used for the estimates. The pit shells are used to constrain the mineralisation to that which is potentially economically and practically extractable under assumed economic conditions. The Mineral resources are quoted at an appropriate in-situ cutoff grade. The pit shells take into account selective mining units and also include estimates of any material below cutoff grade (dilution) that needs to be mined to extract the complete pay portion of the Mineral resource.
P a g e 78 | 137 The Mineral resources are based on initial assessments at the resource gold price of $1,500/oz and consider estimates of all St Ives costs, the impact of modifying factors such as mining dilution and recovery, processing recovery and royalties to demonstrate reasonable prospects for economic extraction. 11.3 Audits and reviews All St Ives resource models compiled by site personnel are reviewed by Gold Fields regional technical staff and Corporate Technical Services (CTS) prior to release for mining and Mineral reserve assessment. The Mineral resource estimates are underpinned by appropriate Mineral resource management processes and protocols to ensure requisite corporate governance in respect of the intent of the Sarbanes-Oxley Act of 2002 (SOX). Technical and operating procedures developed for St Ives are designed to be compliant with the SOX framework as adopted by Gold Fields’ Mineral resource Management for Resource and Reserve estimation, reporting and auditing. Gold Fields uses K2Fly Rcubed® propriety software in combination with SharePoint to ensure accuracy, governance and auditability in the reporting of Mineral resources and Mineral reserves. An external audit by AMC Consultants of the St Ives resource models was completed in March 2021, with no material technical / non-compliance issues identified. The Mineral resource estimate was also subjected to internal review and scrutiny by the relevant Qualified persons and regional technical and financial disciplines, and peer reviewed for technical assurance and compliance in reporting by Gold Fields’ Corporate Technical Services (CTS), Sustainable Development and Head Office Finance teams. 11.4 Comparison with 31 December 2020 against 31 December 2021 Mineral resource No exclusive Mineral resources were disclosed in 2020. Resources have not been reported on this stock exchange previously, however, in the Qualified persons opinion the 2021 to 2020 resource comparison changes are not material.
P a g e 79 | 137 12 Mineral reserve estimates 12.1 Level of assessment St Ives’ Mineral reserves are that portion of the Mineral resources which, as technical and economic studies have demonstrated, can justify extraction as at 31 December 2021. The Mineral reserves are based on appropriately detailed and engineered life of mine plans and are supported by relevant studies completed to a minimum pre-feasibility study level. The life of mine plans are based on measured and indicated Mineral resources converted through the application of appropriate modifying factors to derive Mineral reserves estimates. A pre-feasibility study has an estimated accuracy for operating and capital costs of ±25 % with a contingency of no more than 15 %. All mine design and scheduling is completed by experienced engineers using appropriate mine planning software and incorporates relevant modifying factors, cutoff grades and the results from other techno-economic investigations. Mining rates, fleet productivities, operational and plant capacities and constraints are accounted for in the plan and are typically based on historical performance trends. All geotechnical protocols and constraints are accounted for in the plan, including the provision for suitable mining geometries, mining losses, mining recovery and dilution. Provision is also made for sufficient waste rock and tailings storage with plans in place to meet the life of mine requirements. The Company’s mine closure plans comply with in-country legal requirements and are approved by the regulator. Integrated mine closure plans provide appropriate cost parameters for operational and life of mine planning as well as end of life mine closure commitments. The Mineral reserve includes “incrementally costed” material to ensure the St Ives processing facility is operating at full capacity for the full life of the operation. The mining of this material covers the full cost of mining, variable costs of processing, administration, closure and rehabilitation, and positively contributes to covering fixed site overhead costs. The inclusion of incrementally costed material within the mine plan is viable at St Ives based on the following assumptions: The operation is mine constrained. The mining of incremental material does not extend the life of the overall operation. New projects will not be delayed due to lack of processing feed and capacity. Analysis has been completed to understand the nature of the fixed and variable costs of processing. Analysis has been completed that shows the positive cashflow contribution for this reserve. Time-based economics have been undertaken to show the positive NPV contribution. The point of reference for the Mineral reserves is ore delivered to the processing facility, also known as the run of mine or RoM. The Qualified person’s opinion of the 2021 Mineral reserve estimates is: a) The modifying factors are based on recent mining and processing extraction history and performance and are reasonable and appropriate to derive the reserves from the resources and minimise any estimation errors. The modifying factors are aligned with leading industry technical practice, for example, blended process recovery is used in the reserve estimate. b) St Ives has grown its Mineral reserves over the past three reporting cycles net of depletion. Infrastructure, environmental, permitting, closure, utilities and baseline studies are all aligned to support continued Mineral reserves growth. St Ives’s proactive study pipeline retains a focus on progressing all key work integral to supporting ongoing life of mine extensions so as to avoid any potential production delays. For example, a study has been completed to extend tailings disposal capacity.
P a g e 80 | 137 c) The indicated and measured Mineral resource is sufficient in geoscientific confidence to complete final life of mine designs. However, it is usual to complete a final phase of infill drilling to determine a high confidence ‘mine defined’ resource with detailed geoscientific information prior to final stope design, pillar layouts and detailed production scheduling. d) The reported reserve is a ‘point in time’ or snapshot of the life of mine plan as at 31 December 2021. It is supported by a technically valid and economically viable mine design and schedule combining open pits and three underground mines. The techno-economic work is within the estimated accuracy of ±25 % and does not require more than 15 % contingency for both operating and capital costs. e) Environmental compliance and permitting requirements have been assessed in detail with supporting baseline studies and relevant preliminary internal impact assessments completed. Detailed tailings disposal, waste disposal, reclamation, and mine closure plans are incorporated into the life of mine plan. f) The life of mine plan, in toto, is completed to a minimum pre-feasibility level of study, although certain components of the plan have been completed to a feasibility level of study.
P a g e 81 | 137 12.2 Mineral reserve estimation criteria 12.2.1 Recent mine performance The recent performance of St Ives is summarised in Table 12.2.1. Table 12.2.1: St Ives – recent operating statistics Units 2021 2020 2019 Open pit mining Total mined kt 7,998 10,910 12,913 – Waste mined kt 6,583 8,579 9,161 – Ore mined kt 1,414 2,331 3,752 Mined grade g/t Au 2.2 1.7 1.8 Strip ratio (tonnes) w:o 4.7 3.7 2.4 Underground mining Total mined kt 2,777 2,510 2,254 – Waste mined kt 852 772 926 – Ore mined kt 1,925 1,737 1,328 Mined grade g/t Au 4.9 5.3 4.1 Processing Tonnes treated kt 4,088 4,817 4,466 Head grade g/t Au 3.2 2.7 2.8 Yield g/t Au 3.0 2.5 2.6 Plant recovery factor % 94 91 94 Total gold production koz 393 385 371 kg 12,224 11,971 11,527 Gold sold koz 391 394 363 Financials Operating cost $/oz 687 653 657 Total cash cost $/oz 681 647 666 Capital expenditure $/oz 259 205 283 Capital expenditure $ m 102 79 104 All in sustaining cost (AISC) $/oz 992 906 871 $/oz 1,006 843 818 All in cost (AIC) $/oz 1,026 938 1,026 $/oz 1,040 873 963 Total employees costed (TEC) No. 931 916 930 Note: a) The operating statistics are based on fiscal year measurements. b) Total Employees Costed (TEC) includes project and capital employees. Source: St Ives CPR, 2021
P a g e 82 | 137 12.2.2 Key assumptions and parameters The assumptions and parameters considered in the Mineral reserve estimate are summarised in Table 12.2.2. Table 12.2.2: Summary of material modifying factors Units 2021 2020 2019 Mineral resource Mineral resource gold price $/oz 1500 1,500 1,400 US$/A$ 0.75 0.75 0.76 A$/oz 2,000 2,000 1,850 Cutoff for oxide ore g/t Au 0.79 - 1.05 0.69 – 1.02 0.74 – 1.03 Cutoff for fresh ore g/t Au 0.71 - 3.8 0.69 – 3.1 0.74 – 3.6 Cutoff for mill feed g/t Au 0.71 - 1.05 0.69 – 1.02 0.74 – 1.03 Cutoff for open pit g/t Au 0.71 - 1.05 0.69 – 1.02 0.74 – 1.03 Cutoff for underground g/t Au 1.9 – 3.8 2.0 – 2.1 2.0 – 3.6 Mineral reserve Mineral reserve gold price $/oz 1,300 1,300 1,200 US$/A$ 0.74 0.74 0.75 A$/oz 1,750 1,750 1,600 Cutoff for oxide ore g/t Au 0.35 - 0.40 0.35 - 0.45 0.30 - 0.40 Cutoff for fresh ore g/t Au 0.35 - 3.5 0.35 – 2.7 0.30 – 3.0 Cutoff for mill feed underground g/t Au 2.5 - 3.5 1.9 – 2.7 2.0 – 3.0 Cutoff for mill feed open pit g/t Au 0.35 - 0.40 0.35 - 0.45 0.30 - 0.40 Mining recovery factor (underground) % 90 - 93 90 – 97 90 – 97 Mining recovery factor (open pit) % 91 - 100 91 – 100 91 – 100 Strip Ratio x:1 9.2 6.4 6.8 MCF % 9.2 100 100 Dilution open pit % 100 5 - 52 15 - 52 Dilution underground % 5 - 52 11 – 25 12 – 25 Plant recovery factor (oxide) % 5 - 57 66 – 96 61 – 96 Plant recovery factor (fresh) % 65 – 96 66 – 96 61 – 96 Processing capacity Mtpa 4.7 4.7 4.7 Note: a) The 2021 fiscal modifying factors are valid as at 31 December 2021. b) The cutoff grades are the lowest grade of mineralised rock which determines as to whether it is economic to recover its gold content by further concentration, calculated as per the Gold Fields cutoff grade guidance on methodology and protocol; see Section 11.1.10 for more information on cutoff grade calculation methodology. c) The metal prices selected are the same for the past two annual reserve and resource estimates. d) Relevant modifying factors are reported in ranges and vary based on open pit and underground extraction and estimated unit costs for depth and distance hauled. e) The Qualified person is of the opinion that the modifying factors are adequate for Mineral reserve reporting and that the modifying factors are reported in ranges and vary based on open pit and underground extraction and estimated unit costs for depth and distance hauled. f) Mineral reserve plant recoveries are quoted as the range from the cutoff grade to the maximum recovery at high grade across all projects. Source: St Ives CPR, 2021
P a g e 83 | 137 Operating expenditures comprise: Cash Cost Components: these include direct mining costs, direct processing costs, direct G&A (general and administration) costs, consulting fees, management fees, transportation and realisation charges. Total Cash Costs: these include additional components such as royalties (excluding taxes where appropriate). Total Working Costs: these include terminal separation liabilities, reclamation and mine closure costs (the net difference between the total environmental liability and the current trust fund provision) but exclude the salvage value on closure and non-cash items such as depreciation and amortisation. Total Costs: these include total working costs plus net movement in working capital plus capital expenditure. Major Capital Projects: In addition to long-term capital projects, the life of mine capital expenditure programs generally include detail based on approved expenditure programs. The terminal benefits liabilities are not included in overhead costs as per Company policy and directives. Rehabilitation and appropriate mine closure costs are included following completion of mining. Capital expenditure estimates beyond the next two years are based on pre-feasibility estimates for infrastructure and development requirements for individual projects, and unit-rate average historical costs where applicable. A pre- feasibility study has an estimated accuracy for operating and capital costs of ± 25 % with a contingency of no more than 15 %. Details of the forecast operating and capital expenditures are provided in Section 18. As disclosed in Section 11.1.7, Gold Fields conducts an annual review of metal prices for Mineral resource and Mineral reserve reporting to monitor any significant changes that would warrant re-calibrating the price deck for strategic, business or life of mine planning purposes. This review considers prevailing economic, commodity price and exchange rate trends, together with market consensus forecasts and Gold Fields’ strategy and expectations for the mine operations. The Mineral reserve gold price of $1,300/oz is detailed in particularity in Chapter 16 Marketing. The Qualified person is of the opinion that the gold price applied to the estimation of the Mineral reserves is reasonable and suitable for life of mine planning and is an appropriate reflection of recent historical trends and importantly provides a metal price that mitigates the risk of short to medium term price fluctuations with the potential to impact on the execution of the life of mine reserve plans. The gold price used provides a reasonable long-term delta to current spot prices and incorporates into the life of mine plan appropriate contingency to offset possible short term lower price cycles. For the operating mines, 6 to 18 month trailing average actual costs form the basis of the unit rates applied to the reserve financial model, with consideration for expected variations in operating and capital costs. This timeframe is selected based on alignment with recent business planning data. For new mines, costs are based on estimates from a range of recent sources and are deemed appropriate and representative by the Qualified person. The Mineral reserve estimates may be materially affected based on changes to the cost and price assumptions, in addition to changes in the modifying factors. The reserve is assessed at multiple scales, including individual stope or pit, level, orebody, mine, and operation. As such, the Qualified person is of the opinion that the reserve plan should be viewed as a consolidated entity, as removal of key components of the reserve may have a material and disproportionate impact on the overall value and viability of the plan. In addition to changes to modifying factors, additional data acquired into the future may materially impact the reserve estimate. Examples include, but are not limited to, acquisition of additional drilling data, changes to interpretation of the data, mining studies, internal and external approvals and operating strategies.
P a g e 84 | 137 12.2.3 Cutoff grades Cutoff grades for Mineral reserves are based on St Ives’ current planning assumptions, updated annually, which are the best available estimates for forecast costs and metallurgical recoveries at the time of calculation. Gold price assumptions are provided by Gold Fields Technical Services. Open pit The cutoff grades for St Ives’ Mineral reserves are summarised in Table 12.2.3. Table 12.2.3: Open pit reserve cutoff grades Area Reserve cutoff grade (g/t Au) RoM Clifton 0.35 Delta Is South 0.30 Justice 0.35 Neptune LS OX 0.40 Neptune fresh 0.35 Pistol Club 0.35 Swiftsure 0.40 Thunderer 0.40 Trinidad 0.40 Note: a) The cutoffs are estimated based on the reserve price, reserve modifying factors and are not expected to change materially over the life of mine reserve. b) The cutoff grades, price and modifying factors are incorporated in the estimation of the reserve shell. c) The Qualified person is of the opinion that the detailed design of the selected reserve shells that are incorporated into the reserve estimation minimise estimation errors. Source: St Ives CPR, 2021 Underground The cutoff grades for St Ives’ underground Mineral reserves are summarised in Table 12.2.4. Table 12.2.4: Underground reserve cutoff grades Area Reserve cutoff grade (g/t Au) RoM Hamlet North 3.5 Invincible 2.5 Invincible South 2.5 Invincible South (Deeps) 2.9 Invincible Deeps 2.8 Note: a) The underground cutoffs are estimated based on the reserve price, reserve modifying factors and are not expected to change materially over the life of mine reserve. b) The estimated cutoff grades are adjusted for increased unit costs associated with depth and support type costs. c) The Qualified person is of the opinion that the estimated life of mine schedule contains sufficient diligence to minimise errors. Source: St Ives CPR, 2021 12.2.4 Mine design and planning Mineral reserves are defined by the application of mine planning and optimisation processes to 3D models of in-situ gold mineralisation (inventory models).
P a g e 85 | 137 A range of technical constraints are considered in the design and evaluation process. Geotechnical constraints affect the size and orientation of the various excavations that can be created in the underground mines and the wall angles in the open pit mines. Metallurgical constraints determine the proportion of contained gold that can be recovered from processed ores. Economic constraints including mining and processing costs and gold price determine the limits of profitable extraction. Cutoff grades are applied to define potentially economic blocks or panels based on direct mining and/or processing costs, commodity prices, processing recoveries and other parameters. The economic viability of mining blocks is then tested by determining whether the margin above cutoff is sufficient to cover the required capital development costs and provide a positive return on investment in a process of mine optimisation. Open pit mine optimisation software is used to apply economic parameters and physical constraints to inventory models to identify the limits of extraction which provide maximum cashflow. Detailed design is then undertaken to validate the results of the optimisation. The process is iterated until an acceptable level of correlation is achieved between the optimal shell and detailed design. The open pit slope parameters or wall slope angles are based on the geotechnical considerations described. These include weathering, rock mass strength, frequency and orientation of fracturing. The geotechnical and hydrogeological parameter are discussed in Section 13. Underground mining methods are largely determined by the geometry of the mineralised zones and the evaluation may involve review of more than one method to select the optimal conceptual mining method. Underground optimisation relies on the creation and evaluation of potential mining increments utilising mine design software. The infrastructure required to access the mineralisation is then designed before evaluation of the project. Discrete zones within the defined areas of interest are further evaluated to ensure they satisfy overall economic criteria including any additional capital requirements. Allowances are made for minimum mining width, dilution and ore loss appropriate to the mining method being considered. Historical performance measures are considered in the determination of these modifying factors. Infrastructure, waste disposal and ore stockpile management requirements are incorporated into the planning process. The following standard development dimensions are used: Decline and truck accesses – 5.5 mW × 5.8 mH Ore drives (requiring truck Accesses) -5.0 mW x 5.5 mH Other level accesses, Ore drives – 5.0 mW × 5.0 mH The geotechnical and hydrogeological parameters are discussed in Section 13. The underground mines operate with a primary ventilation circuit that is designed to maintain sufficient airflow to safely support the mining activity. The primary ventilation circuits are powered by large capacity exhaust fans that are mounted on the surface or underground. The main access decline, escapeways and dedicated intake drives act as intake airways and dedicated exhaust shafts act as the return airway. Primary ventilation fans are selected to provide sufficient primary ventilation flow to satisfy the relevant mining regulations and the planned diesel equipment to be used at the mine. The underground mines at St Ives are relatively shallow, so refrigeration and cooling are not required. The potential requirement for refrigeration and cooling is considered in the mine planning process. 12.2.5 Mining schedule The company’s annual mine planning process is anchored by a corporate planning calendar that sets out the sequence of events to be followed that ensures a strong linkage between the strategic planning phase and the life of mine plan itself that defines the Mineral reserves. During the first half of the year the preferred strategic plan is confirmed and approved by the company Executive Committee. This provides guidance for required investment and business and operational planning to position the mine to deliver on the strategic intent for the property. The detailed two-year
P a g e 86 | 137 operational plan and budget is informed by financial parameters determined by the Executive Committee and is the anchor to the longer-term planning and equates to the first two years of the life of mine plan. The overall planning process schedules key work to be completed and stage gated before subsequent work can be continued and includes the metal prices, geology and estimation models, resource models, mine design, depletion schedules, environmental and social aspects, capital and operating costs and finally the cashflow model and financial valuation. Capital planning is formalised pursuant to Gold Fields’ capital investment and approvals process. Projects are categorised and reviewed in terms of total expenditure, return on investment, net present value (NPV) and impact on All-in Costs (AIC) per ounce and all projects involving amounts exceeding $40 million are submitted to the Board for approval. Material changes to the plans are referred back to the Executive Committee and the Board. Post- investment reviews are conducted to assess the effectiveness of the capital approvals process and to leverage continuous improvement opportunities going forward. The Mineral reserve estimates are based on an appropriately detailed and engineered life of mine plan that is supported by relevant studies completed to a minimum PFS level of work. All design and scheduling is completed by experienced engineers using appropriate mine planning software and incorporates all relevant modifying factors, the use of cutoff grades and the results from other techno-economic investigations. Mining rates, fleet productivities and all key operational and plant capacities and constraints are accounted for in the plan and are typically based on historical performance trends. All geotechnical protocols and constraints are accounted for in the plan, including the provision for suitable mining geometries and ground support, mining losses in pillars, mining recovery and dilution. The provision of sufficient waste storage and tailings capacity is engineered into the plans to meet the life of mine requirements. Mine planning is driven primarily by personnel at the mine who are best positioned to determine the technical and commercial objectives for the site based on the parameters, objectives and guidelines issued by the corporate office. The site-based planning is supported by regional technical services functions, as well as from corporate technical services (CTS) and the corporate finance and sustainable development teams which provide overall oversight and assurance. Underground Underground mine schedules are based on 3D block Mineral resource models (inventory models), with allowances made for minimum mining widths, dilution and ore loss appropriate to the mining method being considered and geotechnical considerations. Historical performance measures are considered in determination of these modifying factors. Underground mining equipment availability and utilisation data are collated as part of the scheduling and equipment allocation process Table 12.5. Actual and planned equipment availability ranges from 80 % to 90 % for most machinery. The required equipment utilisation is generally between 60 % and 82 %. Availability and utilisation are based on calendar hours Invincible Invincible South Invincible Deeps Hamlet North Open pit Open pit mine design and scheduling is based on 3D Mineral resource block models. The ore is assigned to selective mining unit SMU mining shapes based on equipment size and practical selectivity. The selective mining unit SMUs are accumulated into ore dig plans.
P a g e 87 | 137 The selected pit shells are subjected to detailed mine design and extraction sequencing to optimise the waste: ore strip ratio and with benches recovering ore above the reserve cutoff grade. The access ramps are ideally placed to minimise ore loss below the ramp and can be outside the selected shell. The open pits are sequenced to derive the best possible integrated plan and to blend feed to the plant to assist with life of mine tail end management. Neptune Clifton Invincible Justice Pistol Club Swiftsure Thunderer Trinidad St Ives generates a ‘Mine Planning Assumptions’ document on a quarterly basis which defines the operating strategies for each mine. It pursues to document operational inputs, production targets, mining constraints/parameters and the planning assumptions that are used the generates the LoM plan. Table 12.2.5: St Ives – Open pit and underground and mining equipment Equipment class Equipment type Units Open pit Excavator Komatsu PC3000 2 Excavator Komatsu PC2000 1 Dump truck (90t) Komatsu HD785 0 Dump truck (150t) Komatsu HD1500 9 Crawler bulldozer Komatsu D375 4 Motor grader Komatsu GD825 2 Wheel dozer Komatsu WD900 1 Blast hole drill Sandvik Panterra DP1500i 3 Grade control drill DRA GC 600 1 Underground Underground trucks 16 Underground loaders 10 Underground jumbos 7 Underground production drills 5 Note: a) The estimated reserve life of mine mining equipment fleet is expected to vary based on the open pit underground mining ratios. b) Availability and utilisation of mining equipment reference Table 12.2.5. c) The heavy mobile mining fleet is renovated based on manufacturers specification or on regular maintenance records. d) The Qualified person is of the opinion that St Ives fleet and the fleet of the contractor support the life of mine reserve. e) Invincible Deeps has not yet been mined, fleet numbers represent additional equipment required once this project is active. Source: St Ives CPR, 2021 Refer to Section 19.1 for details on the LoM mine schedule. The Qualified person is of the opinion that the mine plan and schedule incorporate appropriate assessment of all relevant technical, environmental, social and financial aspects to ensure the Mineral reserve complies with the SK rule instructions and requirements. After reasonable assessment there is no unresolved material matter that could have a
P a g e 88 | 137 significant impact on the mines ability to execute the life of mine plan. The mine plan and schedule incorporate consideration of the following key criteria: Production depletion up to 31 December 2021 Application of cutoff grades to determine mineable ore Application of appropriate modifying factors to convert resource to reserve Allocation of suitable mining equipment and costs Incorporation of realistic mining rates and efficiencies Practical and realistic mine design and mining methods Integrated production scheduling taking account of capacities, constraints and bottlenecks Use of appropriate paste filling rates for stope voids Integrated project management and execution Security of water and energy for the life of mine Provision for mine rehabilitation and mine closure costs Consideration of all environmental, social and legal aspects to enable life of mine plan execution Appropriate life of mine tail end management Security of current and future land tenure and relevant leasing agreements, permits and licenses Life of mine cashflow model and economic viability 12.2.6 Processing schedule The processing schedule is derived from the Mineral reserve schedule. The individual ore type recovery formulas as detailed in Section Error! Reference source not found. are used in the mine schedule to aggregate into an overall p rocess recovery. Ore stockpile management at St Ives is based around optimising the blend requirements to the processing facilities with regard to material types and grade management. Some low-grade surface stockpiles are incorporated into the LoM plan on a marginal cutoff basis towards the end of the mine life to provide volume and is part of the overall environmental site restoration. Refer to Section 19.1 for details on the LoM processing schedule. 12.2.7 Classification criteria St Ives’ Mineral reserves are classified as either proven or probable in accordance with the definitions in Subpart 229.1300 of Regulation S-K. The estimation of reserves for both underground and open pit operations is based on exploration and sampling information gathered through appropriate sources, primarily from DD, RC, AC and sonic drilling techniques. The locations of sample points are spaced close enough to deduce or confirm geological and grade continuity. Generally, drilling is undertaken on grids, which range between 10 m by 25 m for proven Mineral reserves and up to 40 m by 60 m typically for probable Mineral reserves, although this may vary depending on the type and continuity of the orebody. In underground operations, mapping and sampling of development excavations where the orebody is exposed is used to supplement the initial drilling information. Where required supplementary close spaced mine definition drilling (infill) is undertaken to enable final detailed production design and extraction sequencing. At St Ives, a proven Mineral reserve is also assigned if it is flagged as a measured Mineral resource and if the reserve block is covered by sufficient infill drillholes and/or exposed development face mapping. A probable Mineral reserve
P a g e 89 | 137 is assigned if it is flagged as an indicated Mineral resource, is only covered by exploration / resource definition drillholes, and has no development face mapping. Mineral reserve statements include only measured and indicated Mineral resources modified to produce Mineral reserves contained in the life of mine plan. 12.2.8 Economic assessment The basis for establishing economic viability is discussed in Section 19. 12.3 Mineral reserves as of 31 December 2021 The St Ives Mineral reserves as of 31 December 2021 are summarised in Table 12.3.1. The Mineral reserves are 100 % attributable to Gold Fields and are net of production depletion up to 31 December 2021. The point of reference for the Mineral reserves is ore delivered to the processing facility. Table 12.3.1: St Ives – summary of gold Mineral reserves at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,300/oz Amount/ (kt) Grades/ (g/t Au) Amount/ (koz Au) Cutoff grades/ (g/t Au) Metallurgical recovery/ (%) Underground Mineral reserves UG proven Mineral reserves 1,734 5.1 287 2.5 to 3.5 92.8 % to 96.5 % UG probable Mineral reserves 11,526 4.6 1,693 2.5 to 3.5 92.8 % to 96.5 % UG total Mineral reserves 13,260 4.6 1,980 2.5 to 3.5 92.8 % to 96.5 % Open Pit Mineral reserves OP proven Mineral reserves 63 2.2 4 0.35 to 0.40 89.5 % to 97.6 % OP probable Mineral reserves 3,852 2.3 282 0.35 to 0.40 89.5 % to 97.6 % OP total Mineral reserves 3,915 2.3 286 0.35 to 0.40 89.5 % to 97.6 % Stockpile Mineral reserves SP proven Mineral reserves 2,906 1.6 146 0.35 to 0.40 89.5 % to 97.6 % SP probable Mineral reserves - - - SP total Mineral reserves 2,906 1.6 146 0.35 to 0.40 89.5 % to 97.6 % Total Mineral reserves Total proven Mineral reserves 4,703 2.9 437 Total probable Mineral reserves 15,378 4.0 1,975 Total St Ives Mineral reserves 2021 20,081 3.7 2,412 Total St Ives Mineral reserves 2020 25,479 3.3 2,665 Year on year difference (%) -21% 15% -9%
P a g e 90 | 137 Notes: a) Rounding of figures may result in minor computational discrepancies. b) Refer to Table 12.5.1 for year-on-year Mineral reserve comparison. c) Quoted as mill delivered metric tonnes and run-of-mine (RoM) grades, inclusive of all mining dilutions and gold losses except mill recovery. Metallurgical recovery factors have not been applied to the reserve figures. The metallurgical recovery is the ratio, expressed as a percentage, of the mass of the specific mineral product recovered from ore treated at the process plant to its total specific mineral content before treatment. The recoveries for St Ives vary according to the mix of the source material (e.g. oxide, transitional fresh and ore type blend) and method of treatment. d) The metal prices used for the 2021 LoM Mineral reserves are based on a gold price of $1,300 per ounce (at an exchange rate of A$1:$0.74). Open pit Mineral reserves at St Ives are based on optimised pits and the underground operations on appropriate mine design and extraction schedules. The gold price used for Mineral reserves is detailed in particularity in Chapter 16 Marketing. e) Dilution relates to planned and unplanned waste and/or low-grade material being mined and delivered to the process plant. Ranges are given for those operations that have multiple orebody styles and mining methodologies. The mine dilution factors are 5 % to 52 % (open pit) and 5 % to 57 % (underground). f) The mining recovery factor relates to the proportion or percentage of ore mined from the defined orebody at the gold price used for the declaration of Mineral reserves. This percentage will vary from mining area to mining area and reflects planned and scheduled reserves against actual tonnes, grade and metal mined, with all modifying factors, mining constraints and pillar discounts applied. The mining recovery factors are 90 % to 93 % (underground) and 91 % to 100 % (open pit). g) The cutoff grade may vary per shaft, open pit or underground mine, depending on the respective costs, depletion schedule, ore type, expected mining dilution and expected mining recovery. The average or range of cutoff grade values applied in the planning process are: St Ives 2.5 g/t to 3.5 g/t Au mill feed (underground) and 0.35 g/t to 0.40 g/t Au (open pit). h) An ounces-based Mine Call Factor (metal called for over metal accounted for) determined primarily on historic performance but also on realistic planned improvements where appropriate is applied to the Mineral reserves. A Mine Call Factor of 100 % has been applied at St Ives. i) The Mineral reserves are estimated at a point in time and can be affected by changes in the gold price, US Dollar currency exchange rates, permitting, legislation, costs and operating parameters. j) St Ives is 100 % attributable to Gold Fields and is entitled to mine all declared material located within the properties mineral leases and all necessary statutory mining authorisations and permits are in place or have reasonable expectation of being granted Source: St Ives CPR, 2021 The St Ives Mineral reserves are the economically mineable part of the measured and indicated Mineral resources based on LoM schedules and pre-feasibility studies completed at the reserve gold price of $1,300/oz to justify their economic viability at 31 December 2021 (refer to Section 19 for details on the supporting economic analysis). 12.4 Audits and reviews Audits and reviews completed at St Ives during 2021 included: Site based internal peer reviews, validation and reconciliation of geology models, wireframes, estimates process and outputs with senior geology MRM staff and department managers. Ongoing routine integrated routine drilling, sampling, geology audits, reviews and coaching of geological staff by senior geologists and MRM department heads to ensure due process and SOX compliance in line with site and Gold Fields’ documented processes, procedures and methodologies. Perth corporate technical audits and review of geology, estimation and mine planning models. Gold Fields Group geology technical team reviews and site visits for validation and compliance evaluation of the resources and reserves process, detail and output. External audit on the December 2020 Mineral resources and reserves by AMC Completers in March 2021. No material technical / non-compliance issues were identified. Several continuous improvement recommendations were made. ISO14001 surveillance audit by recognised external auditors. OHSAS 45001 certification audit by recognised external auditors. TSF annual geotechnical audit. Global Reporting Initiative third party (KPMG). Ongoing routine internal audits (Gold Fields Johannesburg Internal Audit). Annual external financial and non-financial audits (PWC). Sustainable Development Audit (ERM). Gold Fields Mine Closure Guideline Gap Assessment (MSA). External Closure and Rehabilitation audit (PWC).
P a g e 91 | 137 Internal legal compliance and ethics policy review. Internal SOX compliance (Perth and GFL Corporate auditors). External SOX compliance (ERM). WA inspectorate audits (DMIRS, DWER). ISO45001 surveillance audit ISO27001 Certification External Financial Audits (KPMG to 2018, PWC from 2019) No adverse findings were recorded from any of the audits with minor improvements, adjustments and best practice continuing to be implemented. Records of audits are filed electronically on site in relevant departments and physically for major audit signoffs reported in the Gold Fields annual report. 12.5 Comparison with 31 December 2020 to 31 December 2021 Mineral reserve The difference in Mineral reserves between 31 December 2020 and 31 December 2021 is -253 koz Au or -9 % (Table 12.5.1). Table 12.5.1: Net difference in Mineral reserves between 31 December 2020 and 31 December 2021 Proven and probable Reserve Unit Change % Gold on the RoM As at 31 December 2020 koz 2,665 Depletion 2021 koz -15 % -406 Gold price koz 0 % - Cost koz -14 % -385 Discovery koz 20 % 534 Conversion koz 0 % - Inclusion / exclusion koz 0 % 4 As at 31 December 2021 koz -9 % 2,412 Note: a) The Qualified person opinion the year-on-year reserve changes are not material. Source: St Ives CPR, 2021 Depletion was dominated by production from Invincible South, Neptune, Hamlet North and Invincible. The net effect of increases in mining cost assumptions, with lesser variations in processing and administration costs, and metallurgical recovery assumptions contributed an overall negative contribution to Mineral reserves compared to December 2020. Projects with significant overall variances affected by these changes are Santa Ana, Invincible pit and Incredible. Discovery in Mineral reserves was dominated by the conversion of Mineral resources at the Invincible underground projects. A series of overlapping internal processes exist at Gold Fields to review and validate the modifying factors, input assumptions, cutoff grades, designs, schedules, economic evaluation, and other technical assessments. These reviews include site, regional and group technical assessments, internal audits, and trained Qualified person authorisations. Multiple external audits of the Gold Fields reserves declarations and processes for St Ives have been completed within the past 5 years. These processes are designed to reduce the likelihood of a significant or material error in the reserves estimation process and associated reserves declaration, although potential for error exists. The Qualified person for Reserves is not aware of any material error or omission that at the time of writing would be deemed likely to have a significant impact on the operation’s ability to deliver the reserve mine plan.
P a g e 92 | 137 13 Mining methods The mining process and methods comprises two principal activities: (i) developing access to the orebody; and (ii) extracting the orebody once accessed. These two processes apply to both surface and underground mines. 13.1 Geotechnical models Ground control systems for the underground excavations use both rock mass reinforcement and surface support components. Each mine at St Ives has a specific Ground Control Management Plan, which outlines the systems and processes used to address and manage the risks associated with ground control. The underground life of mine plans adapts to incorporate the evolving geoscientific information. There are levels of standard and elevated support that apply in different circumstances. The primary underground support generally consists of 3.0 m or 2.4 m long galvanised split-set rock bolts in the backs, the shoulders and sidewalls. Galvanised mesh is also used as a surface support in conjunction with the split-sets. High level support is defined for areas with high stress and/or risk of seismic activity and includes cable bolts, fibrecrete, resin bolts, hybrid anchor/friction rock bolts and other solid anchors. The St Ives area has a history of seismic activity in mining areas below 400 m depth. Seismic monitoring using geophones is conducted in areas where higher levels of seismicity are expected. Support and stoping methods as well as the extraction sequencing and stand-off distances to infrastructure take into account the increased risk for seismic events in the deeper areas. Poor rock mass quality reduces the design hydraulic radius of the stope walls. Stope spans are calculated using a combination of the empirical ‘Mathews Stability Graph method’ with back analysis of previous stopes with similar rock mass conditions and equivalent radius factor (ERF) modelling. For deeper mines numerical stress modelling is also undertaken. Table 13.1.1 provides a summary of the stope and development design parameters used at each of the current underground mining areas. Backfill is emplaced in some instances as rock fill, either using current development waste or surface waste rock sources. Where paste fill is utilised, the paste is transported through drillholes and horizontal reticulation pipes to the stope. The paste fill is gravity fed or pumped as required. More than 40 open pits have been mined at St Ives to date with very few major slope stability issues. The pits within Lake Lefroy excavate up to several tens of metres of lake sediments before encountering oxidised basement rock. The lake sediments generally require flatter overall wall angles. Pit walls are commonly developed in competent mafic rock, although occasional weak ultramafic material or blocky felsic-intermediate rock mass is exposed. Laser scan modelling is used, along with 3D photogrammetry and/or radar monitoring of whole walls or work areas as required. Slope design, hydrogeological planning and water management are the primary risk and opportunity areas identified for the open pits.
P a g e 93 | 137 Table 13.1.1 Stope and development parameters for current underground mines Item Parameter Geotechnical recommendation Stope HR INV Deeps – 20 m strike with HR of between 5 and 5.3 for LHOS with Paste Fill Inter-lode pillar INV Deeps – Multiple inter-lode pillars with minimum pillar width 7 m when filling with paste. INV South & Fenton – when not using paste 10 m, using paste 7 m HNO – 10 m when using paste Level Spacing All – 20 m Floor to floor with access drives offset. Stope Pillars – Rib INV Deeps – No rib pillars. INV South & Fenton – 0.5 x width of largest stope, with a minim of 7.5 m. HNO – 5 m minimum to 9064. No rib pillars designed thereafter. Stope Pillars – Sill INV Deeps – None in the current design. INV South & Fenton – Minimum of 7.5 m. HNO – No sill pillars in design. Stope HW/FW support INV Deeps – Drives will be campaign cabled and will provide HW and FW support. INV South & Fenton – HW cables where open stopes are stacked. HNO – HW cables where intercepting major structures and contact with halo. Stope Brow support INV Deeps – Cables 9 x 6 m for all brows. INV South & Fenton – 3x 6 m for interim brows and 9 x 6 m for all final brows. HNO – 3x 6 m for interim brows and 9 x 6 m for all final brows. Preferred sequencing options INV Deeps – Macro: Top down, 45 ° centre out sequence with Footwall drive access to the North and end on access to the South. Micro: Interlode lead lag of 1 stope length maximum with Footwall stopes taken first. INV South and Fenton – Top down, 45 ° extracting into a central pillar. HNO – Top down, 45 ° extracting to end on access. Estimated dilution INV Deeps – 1 m (ELOS) total from the hangingwall and footwall from all geotechnical domains. INV South & Fenton – 0.8 m (ELOS) from combined HW and FW. HNO – 0.9 m (ELOS) from combined HW and FW where not influenced by Brittle Fault and 3.3 m when influenced by Brittle Fault. Operating Development Min Pillar width All – 1.5 m x width of largest opening for non-seismic conditions and 3 m x width of largest drive for seismic conditions. Ore Drives INV Deeps – MDX Bolts, osro straps, mesh and cable bolts. INV South and Fenton – Split sets and mesh to 8850 and 8862, then MDX bolts, osro straps and mesh below these levels. HNO – Garock bolts, osro straps and mesh. Capital Development Decline offset INV Deeps – Minimum 80 m standoff to the ore zone from 8690 Level or 590 m below surface to the bottom of the current LoM. INV South & Fenton – 30 m up to 400 m below surface and 45 m to the current extent of the orebody. HNO – 40 m to 400 m below surface and 60 m at 600 m below surface. Minimum Pillar Width Same as operating development. Decline & Access Support All – Split sets, 2.4 m + 3.0 m long, spaced 1.1 x 1.4 m with mesh to 3.2 m off floor in good ground. Split sets, 2.4 m + 3.0 m long, spaced 1.1 x 1.4 m with mesh to 1.8 m off floor in poor ground. Vertical Development Exhaust LH rise, raise-bore All – No support. All large diameter raise bores (greater than 2.5 m wide) to have dedicated geotechnical drillhole and stability analysis completed. Escapeway raise-bore INV Deeps – No Support as all raise bores is expected to be drilled in fresh material (Diameter 1.1 m). INV South and Fenton – All raises in current designs are situated in fresh material. HNO – All raises in current designs are situated in fresh material. Source: St Ives CPR, 2021
P a g e 94 | 137 The slope design configurations for Neptune are provided in Table 13.1.2. Table 13.1.2 Neptune slope configurations Material From (mRL) To (mRL) Batter height (m) Batter angle (deg.) Berm width (m) IRA (deg.) Lake sediments Surface 275 10 70 10 36.2 Oxides 275 215 10 45 7.5 29.7 55 34.6 Transitional 215 195 10 65 7 40.6 Fresh 195 Bottom 10 70 5 49.2 15 70 5 55.1 15 75 6.5 55.0 20 70 6.5 55.4 20 75 7 58.3 Source: St Ives CPR, 2021 Historically several of the open pits at St Ives have mined through voids left from previous underground mining. A downhole laser cavity survey tool is used to aid in the definition and detection of underground voids. The largest stopes are backfilled with spent heap leach material via surface drillholes to assist stability and future mining around voids. Calculation of slope angles is undertaken using both kinematic analysis and limit equilibrium modelling using both semi-deterministic and probabilistic methods and are based on assumed performance control by ubiquitous structure. New slope designs are compared with empirical performance information under varying slope and ground conditions to ensure slopes are not overly aggressive or conservative. Pit inspection processes are reviewed to ensure operational ground control management options are identified and utilised effectively should design slope angles become more aggressive. Scat management, hydrological issues and mining through underground excavation voids are the greatest geotechnical challenges for the open pit operations. 13.2 Hydrogeological models Hydrogeological analysis for mining projects is completed as part of the mine planning process. This work typically involves various testwork and modelling to determine the likely permeability of the relevant rock mass and the expected water inflow into the open pit or underground operation. Water inflows into the current underground mines are relatively low and are handled by staged mono pump mine drainage arrangements. The groundwater across all sites is hypersaline. Mine water is deposited onto the salt lake surface in line with the environmental permitting. The open pit in current activity is situated on Lake Lefroy and uses advanced dewatering techniques through the use of temporary sumps, situated at the bottom of the pit. The water is pumped out of the sumps and discharged into an approved location. The Qualified person’s opinion is that all appropriate geotechnical and hydrogeological parameters have been suitably considered and risk assessed to support the mining method selection and extraction sequencing and this information is embedded in St Ives’s Ground Control Management Plan which is routinely updated as new empirical information becomes available. The mine plan is geotechnically robust from a local and regional stability perspective. 13.3 Mining methods The gold mineralisation at St Ives is mined via both open pit and underground methods to depths generally not exceeding 1,000 m below surface. Some projects involve mining deposits on or under the Lake Lefroy salt lake so
P a g e 95 | 137 that extraction requires construction of bunds and other earthworks to provide access, stockpile areas and to prevent surface water incursion. Open pit Open pit mining at St Ives is by conventional drill and blast / truck and shovel extraction. Grade control is generally by inclined RC drilling on approximately 5 m x 10 m centres in plan projection. Production drilling ranges from 3.0 m x 3.5 m up to 5.0 m x 6.0 m patterns. Pre-split blasting in hard rock is utilised on 10 m to 20 m benches in fresh rock where required. Open pit projects may include 10 m to 50 m of unconsolidated sedimentary overburden which require hard rock for sheeting to enable equipment traffic capability during mining and/or dewatering of the sedimentary overburden prior to mining. Load and haul are completed by 90 t to 150 t dump trucks with 120 t to 300 t excavators in backhoe configuration mining benches varying from 5 to 10 m. The benches are generally excavated in passes (flitches) of 2.5 to 3.0 m (including heave). Gold mineralisation is mined selectively to cutoff and segregated into grade ranges as required to balance the ore production and processing capacities. Open pit operations are undertaken by St Ives employees following the transition to owner mining in mid-2012. This includes drill and blast and loading and hauling aspects of the open pit operations. Contactors and hire equipment are utilised to supplement the St Ives fleet when needed to meet production requirements. The Qualified person considered the following factors when selecting the open pit mining method: a) The geotechnical and rock behaviour models, see Section 7.4 for detail. b) The hydrological surveys as described in Section 7.3. c) The open pits are supplementary to the underground and are completed within twelve months of commencing. d) The modifying factors including strip ratios as stated in Table 12.2.2 and the open pit cutoff grades as stated in Table 12.2.3. e) Practical mining rates, selective mining unit dimensions, mining dilution and mining recovery. Underground The underground mines at St Ives are often extensions to the open pit mines. Underground operations are characterised by common features which allow a high-level of standardisation in operating strategy, mine design, stoping methods and mining equipment utilisation. Underground mining portals are generally cut into unweathered ground at the lowest practicable level in the walls of the precursor pits. Underground mines are accessed via declines, with additional development of raises for return airways and ladderways as a secondary means of egress. Standard gradients of the declines are 1 in 7 and decline dimensions sized appropriately for the fleet of underground haul trucks (generally 5.5 m wide by 5.8 m high with arched backs). Ore drives are developed to access the ore and future stoping production areas. Ore drive dimensions are sized appropriately to the long hole drilling and the loading fleet utilised for the extraction of the mineralisation that is present. All underground development is supported in line with the ground conditions present and the planned use and life of the development. There are two ore drive dimensions used at St Ives: Ore drives requiring truck Access -5.0 mW x 5.5 mH Ore drives not requiring truck Access – 5.0 mW × 5.0 mH Underground mining methods are largely determined by the geometry of the mineralised zones and the evaluation may involve a review of more than one method. Underground mining is dominated by mechanised mining by long-hole open stoping (LHOS), with subordinate cut and fill and room and pillar methods for shallower dipping orebodies. The
P a g e 96 | 137 use of paste fill in conjunction with LHOS is applied where mandated by geotechnical factors or where the grade of the ore provides economic benefit. Due to the mining methods employed at St Ives, a few pillars are created, especially within areas mined by LHOS and cut and fill methods. In the flatter dipping lodes where room and pillar mining methods are employed, pillars are used to ensure long term geotechnical stability. These pillars effectively reduce the proportion of mineralisation above cutoff that can be extracted. Permanent pillars in underground mine designs are excluded from the reported Mineral reserves. The underground mining is carried out with standard trackless equipment including electric-hydraulic drilling jumbos and long-hole drills, rubber-tyred diesel-powered load haul dump (LHD) units and underground specific haul trucks. Underground production operations are carried out by St Ives employees (Hamlet North) and contractors (Invincible, Hamlet North). Contactors and hire equipment are utilised to supplement the owner miner fleet when needed to meet production requirements. Specialist underground activities including development, diamond drilling and rise mining are outsourced to specialist contractors to best utilise specialist equipment and skills. The Qualified person considered the following factors when selecting the underground mining method: a) The geotechnical and rock behaviour models, see Section 7.4 for detail. b) The hydrological surveys as described in Section 7.3. c) The modifying factors including underground cutoff grades as stated in Table 12.2.2. d) Practical mining rates, stope size dimensions, mining dilution and mining recovery. e) Infrastructure and operating capacities and constraints. f) Capital and operating costs and economic viability. 13.4 Equipment and labour requirements Open pit mining and underground mining equipment utilised at St Ives is summarised in Table 13.4.1. For open pit equipment, excavator utilisation is typically 75 % with an availability of 88 %. Open pit truck utilisation is typically 73 % with an availability of 85 %. Underground loader utilisation is typically 65 % and availability is approximately 85 %. For underground trucks, utilisation is typically 70 % with an availability at approximately 85 %. Table 13.4.1: St Ives mining fleet Equipment class Equipment type units Open pit Excavator Komatsu PC3000 2 Excavator Komatsu PC2000 1 Dump truck (90t) Komatsu HD785 0 Dump truck (150t) Komatsu HD1500 9 Crawler bulldozer Komatsu D375 4 Motor grader Komatsu GD825 2 Wheel dozer Komatsu WD900 1 Blast hole drill Sandvik Panterra DP1500i 3 Grade control drill DRA GC 600 1 Underground Underground trucks 16 Underground loaders 10 Underground jumbos 7 Underground production drills 5 Source: St Ives CPR, 2021
P a g e 97 | 137 13.5 Final mine outline Figure 13.5.1: N-S section of Invincible complex Source: St Ives CPR, 2021 Figure 13.5.2: S-N section of Hamlet North complex Source: St Ives CPR, 2021
P a g e 98 | 137 Figure 13.5.3: Plan view of the Revenge complex Source: St Ives CPR, 2021
P a g e 99 | 137 14 Processing and recovery methods 14.1 Flow sheet and design The centrally located 4.7 Mtpa Lefroy CIP processing plant was commissioned in early 2005 with a flow sheet like the previous facility incorporating improvements resulting from an increased understanding of the ore mineralogy and metallurgical characteristics, along with newly available technological and equipment advances. A schematic flow sheet for the process plant is shown in Figure 14.1.1. Figure 14.1.1: Schematic flow diagram of Lefroy process plant Source: St Ives CPR, 2021 Ore from both the open pit and underground operations is transported from local surface ore pads at each project to the to the run-of-mine (RoM) pad at Lefroy via surface road trains. Surface haulage works are carried out by a specialist contractor utilising dedicated on-road and off-road multiple trailer road trains. The ore is fed into the primary crusher as a blend via a loader or direct tipped from the road train. The ore blend is managed according to grade and physical characteristics to optimise throughput and recovery in the processing plant. The ore is primary crushed using a 54/77 gyratory crusher and transported to a coarse ore stockpile. Crushed product is transferred via feeders from the stockpile and ground to an 80 % passing 125 micron using a 13 MW single stage variable speed 36 ’x 20’ SAG mill and 315 kW pebble crusher in closed circuit. Classification of the mill discharge is performed by ten 20” hydro-cyclones. Cyclone overflow reports to the leaching circuit while the cyclone underflow returns to the mill with a split directed to the gravity recovery circuit.
P a g e 100 | 137 The gravity recovery circuit comprises a gravity screen, two Knelson QS40 concentrators and an In-line Leach Reactor. Portions of the cyclone underflow slurry flow at a nominal 280 t/hour is fed to two Knelson QS40 concentrators after screening. The concentrate from the centrifugal concentrators is collected and subjected to intensive cyanidation in an In-line Leach Reactor (ILR 3000BA) with the tailings recycled to the milling circuit. Leaching of the cyclone overflow is carried out in five 3,400 m³ sequential leach tanks, and gold adsorption utilises a six-stage carousel AAC Pump Cell CIP circuit. Gold recovery from loaded carbon is via a 5 tonne split AARL elution, electrowinning and smelting circuit. Gold wool is stripped from both the gravity and CIP electrowinning circuits and calcined at high temperature. The calcine is further refined through smelting and crude doré is poured with the purity varying depending on the source. Gold produced from the gravity circuit averages approximately 36.4 % of total gold produced with the leach circuit producing approximately 56.0 %, contributing to an overall processing reconciled recovery of 94.6 % for 2021. Mineralogy, metallurgical characteristics and grades of ores from various areas are known to be variable, with total plant recovery being generally a function of ore source. Gravity doré bars are approximately 90 % to 95 % gold whereas CIP doré bars are dependent on ore feed characteristics and can vary between 80 % to 90 % gold. The doré is dispatched to the Perth Mint refinery for further processing into gold bullion. Tailings from the CIP section is thickened prior to being pumped to an in-pit TSF. Process plant tailings are thickened to a target slurry density of 55 % solids w/w in the tailings thickener. The final tailings slurry is pumped via two-stage pumps to the TSF. When required, hypersaline water from the North Orchin bore is injected into the tailings slurry at the tailings pump box to maintain the total dissolved salts (TDS) above 50,000 ppm, which is deemed acceptable for Cyanide Code compliance as an alternative to cyanide destruction. The installation of a cyanide detoxification circuit using the INCO method was commissioned in 2019. Standard practice at the process plant is to ensure all spillages are captured within bunds and are hosed into sumps for pumping back into the process. There are two main areas for gold to collect outside the electrowinning/smelting and tailings streams: the gold room sump and mill liners and chutes. The gold room sump is cleaned out monthly whilst mill liners are pressure cleaned back into the circuit when removed from service following a reline. Estimation of the exact amount of gold recovered during clean-up is difficult to determine as the material is returned to the circuit without measurement. No gold is currently assumed as being locked up in the circuit that is not able to be accounted for through end-of-month measurement, sampling, and analysis. The heap leach facility was closed at the end of 2012. The heap leach wet plant continued operations to May 2016 when it was decommissioned following irrigation of the historic cells. The heap leach crushing, agglomeration, stacking, and wet plant was subsequently sold. The heap leach drainage system and water collection ponds continue to be maintained and operated in accordance with all government regulations and International Cyanide Management Code (ICMC) requirements. The spent heap leach material is flushed and categorised to a Class I landfill criteria for causeway construction, stemming and sheeting. All potential heap leach ore is either stockpiled or assessed for processing through the Lefroy facility during the remainder of LoM plan. 14.2 Recent process plant performance The recent performance of the Lefroy process plant is provided in Table 12.2.1. 14.3 Process plant requirements Being commissioned in 2005, the Lefroy processing plant is relatively new. Key changes and upgrades implemented since the original 2005 installation includes: Upgrade of the pre-existing gravity concentrators to late model Knelsons Concentrators Decommissioning of the sulphides recovery and regrind circuit
P a g e 101 | 137 Installation of a partial INCO cyanide destruction circuit, using sodium metabisulphite (SMBS) and oxygen Relocation and upgrade of the main plant control room Replacement of the linear trash screens with vibrating screens Key work associated with the 2021 life of mine plan includes: Replacement of the gravity concentrate ILR A structural refurbishment program is ongoing to ensure structural steel and concrete remains in good condition, and that the plant remains compliant with the International Cyanide Management Code (ICMC). The key process plant requirements estimated for the Mineral reserve LoM plan are summarised in Table 14.3.1. These consumables quantities have been estimated using guidance from the 2022 Budget LoM, prorated based on plant feed mass. The number of plant employees required is in the range of 40 to 50. Table 14.3.1: Lefroy process plant – key requirements Units 2022 2023 2024 2025 2026 2027 2028 2029 2030 Ore Processed kt 4,210 4,011 2,247 2,267 1,799 1,700 1,669 1,479 700 Plant Power draw MWhr 108 103 58 58 46 44 43 38 18 Grinding Media t 1,684 1,605 899 907 719 680 668 592 280 Lime t 19,790 18,855 10,562 10,654 8,454 7,991 7,846 6,953 3,289 Sodium Cyanide t 1,942 1,850 1,036 1,045 830 784 770 682 323 Caustic t 401 382 214 216 171 162 159 141 67 Activated Carbon t 168 160 90 91 72 68 67 59 28 Hydrochloric Acid t 221 210 118 119 94 89 88 78 37 SMBS t 632 602 337 340 270 255 250 222 105 Raw Water kL 1,600 1,524 854 861 684 646 634 562 266 Source: St Ives CPR, 2021 14.4 Processing Risks 14.4.1 Major Equipment Failure Industrial mineral processing plants consist of a series of dedicated unit processes, e.g. crushing, grinding, leaching, carbon-in-pulp (CIP), and carbon elution. There is inherent risk associated with catastrophic failure of one (or more) of the key equipment items associated with these unit processes, whereby such failure could lead to a significant period of plant downtime until repairs are completed, resulting in the inability of the processing plan or forecast to be achieved and/or higher operational costs incurred than anticipated. Catastrophic failures could be associated with the structural, mechanical, or electrical components of the key processing equipment items. Key equipment items could include the crushers, grinding mills, or leach/CIP tanks. Risk minimisation activities to reduce the likelihood of such occurrences adopted by St Ives includes: Dedicated on-site maintenance department which undertakes condition monitoring activities, preventative maintenance, and repairs. Selected critical maintenance spares. Contingency operational plans (e.g., contract/mobile crushing plant, leach/CIP tank by-passing). Fire suppression systems. Insurances.
P a g e 102 | 137 Decisions associated with asset management, critical spares, insurances, etc. are outside the responsibility and accountability of the Qualified person, and that some inherent risk and uncertainty associated with catastrophic failure of processing equipment remains. 14.4.2 Plant Operational Management The processing facilities are managed and operated by dedicated teams of personnel, who are required to make many operational and maintenance decisions every day. These decisions can directly impact the performance of the plant while processing the future ore reserves. For example, a decision to process ores at a higher throughput could result in a coarser grind size from the grinding circuit, resulting in a lowering of the plant recoveries. Similarly, the choice to operate the leaching circuit at lower free cyanide concentrations to reduce cyanide usage rates, could result in lower plant recoveries being achieved than anticipated. It needs to be recognised that plant management and the associated decisions made by plant operating personnel, are outside the responsibility and accountability of the Qualified person, and that such decisions and actions taken by plant management can influence the achieved performance of the plant (e.g., throughput, costs, availability and recoveries). 14.4.3 Operating Costs, Plant Consumables and Reagents The operating cost of the processing plant represents a significant cost element to the overall financial evaluation of the reserve’s life of mine plan. The processing facilities use relatively large quantities of power, reagents and consumables, including fuels, cyanide, grinding steel media, lime, caustic, etc. The estimation of future processing costs is required as input into the cutoff-grade calculations and economic assessments of the reserves and resources. To estimate the processing costs, require assumptions to be made concerning consumables consumption rates, unit prices and inflation rates. Metallurgical testing undertaken on the future reserves provides reasonable guidance of potential reagent consumption rates and mill throughput expectations, and this information is considered and reviewed by the plant metallurgist and the Qualified person. St Ives, like many other operating gold processing plants that have a reasonable operating history, do not allow for a discreet operating cost contingency in their future operating cost forecast. The absence of contingency is considered by the Qualified person as being a common and reasonable approach to operational process plant cost forecasting. Consumables, commodity pricing and inflation are subject to external influences that are outside the control or predictive capability of the Qualified person. Further to this, operational decisions made by plant management, or unexpected variances in the nature of the ores being processed could unexpectedly impact reagent and consumables usage rates. Such variances are outside the control or predictive expectations of the Qualified person.
P a g e 103 | 137 15 Infrastructure Details on each major item of non-process infrastructure is discussed in this section. The site infrastructure layout is shown in Figure 3.1.1. The administration offices are located at the Lefroy process plant complex. 15.1 Tailings storage facilities (TSF) The layout of the TSFs is shown in Figure 15.1.1. Figure 15.1.1: Lefroy Central Corridor Infrastructure Source: St Ives CPR, 2021 St Ives operates one active TSF known as the Leviathan In-Pit TSF. All other TSF’s are decommissioned and awaiting rehabilitation (i.e., TSF 1, 2 & 3 and the North Orchin in-pit TSF); or inactive and for emergency use only (TSF 4). TSF 1 has been decommissioned and used for tailings reclamation for underground paste backfill material, using excavators, loaders, and trucks.
P a g e 104 | 137 TSF 2 has been filled to the final design height and decommissioned. The TSF 2 embankments were at their final design level of RL333.7 mKNO (KNO = Kambalda Nickel Operations datum), and the facility was decommissioned in 2010. The starter embankments of TSF 2 were constructed to a nominal crest level of RL315 mKNO using sandy clay borrow material. The embankments were subsequently raised in eight stages to a nominal crest level of RL333.7 mKNO via upstream construction techniques, generally using compacted dried tailings (the initial raises used sandy clay). The downstream or outer batter slopes of the perimeter embankments have a slope of 1:2.5 with intermediate benches at RL318.5 mKNO, RL323.5 mKNO, and RL328.7 mKNO. The downstream batters, including the upstream raises to the RL328 mKNO level, are top-soiled. The upper 5 m is capped with waste rock. TSF 2 is currently inactive. The TSF 3 embankments are at their final design level of RL325.0 mKNO, and the facility was decommissioned in 2016. TSF 3 is a paddock-type facility located immediately west of and abutting TSF 1 and northwest of TSF 2. The starter embankment was constructed to crest level RL305.9 mKNO. Embankment construction was completed in October 2002, utilising clayey fill material borrowed from the facility. The perimeter embankments were subsequently raised using upstream construction techniques in eight stages to crest level RL325.0 mKNO. Stage 2 construction utilised clayey fill sourced from within the facility. Stage 3 construction utilised dried tailings and clayey fill (for part of the northern embankment only). Stages 4 to 8 construction utilised dried tailings. Stage 8 construction was completed in December 2014. The facility has a current maximum embankment height of approximately 27.5 m. The batter slopes on the perimeter embankment are 1:2.75 downstream and 1:1.75 upstream. Therefore, the lower downstream batters of the perimeter embankment below the RL309.9 mKNO bench level (bench confined to western and southern embankments) were top-soiled. However, the embankment batters above RL309.9 mKNO were capped with competent mine waste, have not been top-soiled. TSF 3 is not in operation, and SIGM has completed the removal of the tailings delivery pipelines in preparation for planned rehabilitation. A rehabilitation design is currently underway (by Stantec) to close TSF 3. The rehabilitation design will be completed later in 2021, with construction scheduled to commence in early 2022. Coffey, as the EoR, needs to endorse all designs on TSF 3 that could impact facility safety. Therefore, Coffey requires to review the rehabilitation design and be involved in the design process. TSF 4 is a paddock-type facility approximately 1.5 km southwest of Lefroy Mill. The starter embankment of the first cell of TSF 4 was constructed between October 2011 and July 2012, with a crest level at RL309.0 mAHD (Australian Height Datum). The starter embankment was a zoned embankment constructed from Zone 1A and 1B materials sourced from the Diana open pit, approximately 12 km south-east of TSF 4. Zone 1C material was sourced from the TSF 4 return water pond area. In addition, mine waste rock was used as surface protection and erosion prevention material at the perimeter embankments’ downstream face. The Stage 1 embankment raising of TSF 4A by 2.5 m from RL309.0 mAHD to RL311.5 mAHD was carried out between March 2015 and November 2015. The earthworks comprised raising the perimeter embankments, decant access-way, and decant structure. In addition, tailings sourced from within the TSF 4 floor area were used as a construction material with mine waste capping around the perimeter embankment. TSF 4 is currently inactive. The facility has a current maximum embankment height of approximately 14.5 m. The perimeter embankment batter slopes are 1:2.25 downstream and 1:2 upstream. The embankment crest width is 8 m. The North Orchin In-Pit TSF has reached capacity and was decommissioned in 2015. The Leviathan In-pit TSF was commissioned in early 2017 and is currently active. Leviathan tailings storage volume will total 36.5 Mm³ at 296.50 RL with approximately 2 m of freeboard, providing 0.9 Mm³ of emergency capacity. As of Q3 2021, the pit has a remaining capacity of ~25.671 Mm³ (28.24 Mt) and 53.91 m freeboard remaining to reach the target RL.
P a g e 105 | 137 The Engineer of Record (EoR) for the St Ives TSFs is Coffey (Tetra Tech), based in Perth. All TSFs need to be compliant with the Global Industry Standard on Tailings Management (GISTM) by August 2025. A gap analysis has been completed, and the GISTM compliance program is underway in collaboration with the EoR. 15.2 Waste rock dumps The parameters to be used for designing waste dumps at SIGM are outlined below in Table 15.2.1. They are based on data from the Geotechnical Department and are applicable to oxide, transitional and fresh material types. Lake sediments should be backfilled into mined pits/voids. Encapsulation may be an option depending on the quantity, but this will require consultation with the Geotechnical and Environmental Departments. Table 15.2.1 Waste Dump Design Criteria Parameter Units Value Material Characteristics Angle of Repose deg 37 In-situ Density (avg waste density assumed) t/m³ 2.5 Swell % 25 Tipped Density t/m³ 2.0 Design Criteria Lift Height m 10 Berm Width m 24 Maximum Dump Height m 40 Ramp Gradient 1:n 9 Stand off at Dump Toe (ie. Infrastructure, access) m 25 Stand off at Dump Toe (ie. Pit crest) m Geotech to advise Rehabilitation Criteria Rehabilitated Batter Slope deg 15 Overall Rehabilitated Slope deg 19 Lift Height m 10 Maximum Dump Height m 40 Source: St Ives CPR, 2021 The rehabilitation design requirements for a waste rock dump are specified below in Table 15.2.2 and Figure 15.2.1. Table 15.2.2 Calculation of berm width based on overall rehabilitation angle Parameter Units Value Overall Rehabilitated Slope Angle deg 15.0 Rehabilitated Slope Angle deg 19.0 Lift Height m 10.0 Angle of Repose deg 37.0 C m 8.0 B m 29.0 A m 37 RBW (+A-B)** m 8.0 TBW (=C + C + RBW) m 24 Source: St Ives CPR, 2021
P a g e 106 | 137 Figure 15.2.1 Waste dump design definitions Source: St Ives CPR, 2021 15.3 Water St Ives’ water supply comes from three different sources to support processing, mining and drinking water for human consumption. Potable water is sourced from the Perth to Kalgoorlie scheme via a branch line to Kambalda. A holding tank in East Kambalda supplies St Ives by gravity feeding to various outlets to meet mining, milling and human consumption needs. SIGMC has an agreement with utility Water Corporation for the supply of 909 kL/day of potable water until June 2050. Groundwater comes from the Widgiemooltha borefield approximately 25 km west of the Lefroy processing facility. Twelve bores pump from an underground paleo-valley aquifer to a centralised transfer tank approximately 30 km from St Ives. This water is pumped at up to 100 L/s, providing an annual entitlement of 4,015 ML. Borefield water is only of sufficient quality for processing operations with a TDS of approximately 40,000 ppm and a pH 3.25 – 6.4. Moorebar dam is a catchment dam, approximately 20 km northwest of the Lefroy mill, on crown land over which SIGMC has an agreement to harvest and extract water. The availability of water to pump is weather dependent, but typically provides some water per annum with minimal pumping required from the associated borefield. The quality of the Moorebar dam water is brackish to fresh, being low turbidity and with a TDS under 5,000 ppm. When water is available in Moorebar Dam, and required by processing, it is pumped in 355 mm poly welded pipeline approximately 5 km to a holding tank and then approximately 20 km to the mill.
P a g e 107 | 137 15.4 Power St Ives derives most of its power from BHP Nickel West via a stable energy grid operated by private power provider TransAlta Energy Corporation. The agreement currently in place to 1 January 2024 provides for a maximum supply of 33 MW. Recent average demand for the operation has been less than 25 MW. Power is distributed across the St Ives property by a combination of SIGMC-owned infrastructure and TransAlta Energy Corporation owned infrastructure at system voltages of 132 kV, 66 kV and 11 kV. Power is supplied at transmission voltage to zone substations at the various mining and processing areas where it is reduced to working voltages of 1 kV and 415 V. Small load centres located in areas not easily accessible to the main power distribution network are powered by small generator type arrangements. 15.5 Accommodation St Ives is a mix of residential and fly in fly out work force. The residential workforce predominantly reside in nearby Kambalda and Kalgoorlie. Accommodation for the fly in fly out workforce is provided by three privately operated (ESS, Civeo, Lan Franchi) camps located in Kambalda and south of the Lefroy administration building. 15.6 Site access St Ives constructs and maintains a network of haulage and access roads across the site. Mining on Lake Lefroy requires the construction of causeways, protective bunds and other earthworks to provide access, stockpile areas and to prevent surface water incursions. 15.7 Other infrastructure The administrative centre is located in offices adjacent to the Lefroy processing facility. Office facilities are also maintained at each mining location to support production, statutory and legal requirements. St Ives also has several workshop and washing facilities for the maintenance of vehicles and mining equipment. The mine is supported by fibre optic and wireless networks for telecommunications and information technology. A UHF digital radio network also exists across site for mobile and emergency communications The Qualified person is of the opinion that the infrastructure for the St Ives mining operation is fit for the life of mine reserve estimation and that the Mineral reserve quantities are tested against dump and disposal capacities.
P a g e 108 | 137 16 Market studies 16.1 Preliminary market study A review of metal prices for planning purposes is undertaken annually to monitor any significant changes in price trends or exchange rates that would warrant re-calibrating the price deck before the Strategic Planning process transitions into the Business Planning cycle. This review of the metal price deck has taken account of the prevailing economic, commodity price and exchange rate (Fx) trends, together with market consensus forecasts, in addition to consideration of the Gold Fields’ strategy and expectations for the operations. Our strategy is to (1) mitigate annual volatility by holding planning metal prices as long as warranted to support stability in mine planning, notably regarding the underground MSO and open pit shell selections; (2) maintain appropriate margins on spot and long-term price forecasts to support the Group’s BSC metrics; (3) protect against accelerating mining sector inflation and, (4) to confirm a separate gold price to be used specifically for the Operational Pan (budget) revenue streams and cashflows in Q3 each year. The outcome of the pricing analysis was to use a gold price of $1,300/oz for Mineral reserves and $1,500/oz for gold Mineral resources for the December 2021 disclosure of estimates. The relevant copper and silver prices in US Dollars are shown in the summary table below. Note the A$/oz gold prices applied to the estimates in Australia are included for transparency. Table 16.1.1: Reserve and Resource metal prices Units December 2021 Metal price Deck Metal Unit Mineral reserve 31 Dec 2021 Mineral resource 31 Dec 2021 Gold US$/oz 1,300 1,500 A$/oz 1,750 2,000 Source: St Ives CPR 2021 The above price deck comparison to market long-term forecasts assessed at the time of analysis is consistent with the Registrants approach to retaining good discipline in support of the Company strategy; this approach ensures Gold Fields’ Mineral resources and reserves are not too volatile year-on-year and that the company is protected against possible downside scenarios if the gold price falls up to ~25 % in any specific year. Ensuring sufficient flying height to maintain our margins at prices that could be incrementally lower than the spot price ranges seen in 2021 is also important. Equally, with annual mining sector inflation estimated at $30-40/oz, we need to ensure we mitigate this escalation risk in the life of mine plans and Mineral reserve estimates. Sensitivity analysis on gold price for project financial evaluation is done to provide flexibility/range analysis for all regional studies and site growth opportunities and investment purposes. The Mineral resource gold price premium to the Mineral reserve price is circa 15 % and the differential is in general alignment to our peer group and industry standard practice. The Mineral resource price premium is to provide information on each operation’s potential at higher gold prices and to indicate possible future site infrastructure and mining footprint requirements. All gold produced at St Ives is refined by the Perth Mint in Western Australia. The Perth Mint applies competitive charges for the collection, transport and refining services. The Perth Mint takes responsibility for the unrefined gold at collection from the operation where it engages a sub-contractor, Brinks Australia. Brinks delivers the unrefined gold to the Perth Mint where it is refined, and the refined ounces of gold and silver are credited to the relevant metal accounts held by the operating company with the Perth Mint. The contractual arrangement with the Perth Mint continues until terminated by either party upon 90 days’ written notice.
P a g e 109 | 137 Gold Fields’ treasury department in the corporate office in Johannesburg, South Africa sells all the refined gold produced by the operating company. On collection of the unrefined gold from a mine site, the relevant operating company will notify Gold Fields’ treasury department of the estimated refined gold content, expressed in troy ounces, available for sale. After such confirmation, the treasury department sells the refined gold to authorised counterparties at a price benchmarked against the London Bullion Market Association PM gold auction price. All silver is sold to the Perth Mint at the London Bullion Market Association silver price on the last business day of each month. Gold Fields may periodically use commodity or derivative instruments to protect against low gold prices with respect to its production. Variations in gold price, currency fluctuations and world economics can potentially impact on the revenue received. No gold derivative instruments are in place at the date of this report. The majority of gold production is used for jewellery and for investment purposes, in the latter case because the market views it as a store of value against inflation. In addition, certain physical properties of gold, including its malleability, ductility, electric conductivity, resistance to corrosion and reflectivity, make it the metal of choice in a number of industrial and electronic applications. Supply of gold consists of new production from mining, the recycling of gold scrap and releases from existing stocks of bullion. Mine production represents the most important source of supply, typically comprising 75 per cent. each year. Annual demand requires more gold than is newly mined and the shortfall is made up from recycling. Management believes that long-term gold supply dynamics and global economy trends will support the gold price at levels above or aligned to $1,300 per ounce in the long-term. The market for gold is relatively liquid compared to other commodity markets, with London being the world’s largest gold trading market. Gold is also actively traded via futures and forward contracts. The price of gold has historically been significantly affected by macroeconomic factors, such as inflation, exchange rates, reserves policy and by global political and economic events, rather than simple supply/demand dynamics. Gold is often purchased as a store of value in periods of price inflation and weakening currency. The price of gold has historically been less volatile than that of most other commodities. Significant service contracts and/or leases that are in place to enable execution of the life of mine plan include: Perth Mint - Refining Mining & Drilling MLG – Ore Haulage Coastal Midwest Transport - Freight haulage RUC Cementation – Raise boring APA Operations – Gas Transportation EDL – Power supply Alliance Airlines – Flights Action Industrial Catering – Camp Services ALS Global – Assay Services The Qualified person has relied on information provided by the Company in preparing its findings and conclusions regarding market studies related to gold sales from St Ives. Refining services are based on well-established long-term agreements and expediting gold sales over the life of the asset does not represent any significant uncertainty. Service contracts, lease agreements and goods contracts e.g., diesel, cyanide and cement, necessary to develop the property as planned, are in place and have the capability to support the full projected cashflow period.
P a g e 110 | 137 16.2 Metal Price history Gold prices London Metals Exchange afternoon close Gold spot 30 December 2021 - $1,805.85/oz - A$2,484.32/oz Fx 30 December 2021 A$1:$0727c Gold spot 24 month average - $1,784.45/oz Gold spot 36 month average - $1,653.71/oz Gold spot 60 month average - $1,497.48/oz
P a g e 111 | 137 17 Environmental studies, permitting, and plans, negotiations, or agreements with local individuals or groups Climate change is an integral part of the mineral reserve generation process and incorporating relevant costs associated with climate change, primarily decarbonisation, mitigation and adaptation to the changing climate, is a key theme for the Company. Integration of these key elements into the mineral reserve process is being carried out progressively and simultaneously across all of Gold Fields’ sites. 17.1 Permitting Mining operations on tenements in Western Australia must be developed and operated in compliance with the following Commonwealth and State environmental legislative requirements. 17.1.1 Commonwealth The Environmental Protection and Biodiversity Conservation (“EPBC”) Act 1999 is administered by the Department of the Environment, Water, Heritage and the Arts. Commonwealth approval is required for matters of national significance, as defined in the Act, including the presence of migratory birds, federally listed rare flora or fauna, Commonwealth land, nuclear actions and marine areas. Currently, the Clean Energy Regulator oversees the administration of the Large-scale Renewable Energy Target and the Small-scale Renewable Energy Scheme to encourage additional generation of electricity from renewable energy sources. The Renewable Energy Target legislation provides an incentive for investment in renewable energy power stations and smaller systems while ensuring the energy sources used are ecologically sustainable. The Clean Energy Regulator Act, 2011 regulates and convenes the Clean Energy Regulator. The Carbon Farming Initiative is a voluntary carbon offsets scheme. It is an integral component of the Emissions Reduction Fund and allows land managers to earn carbon credits by changing land use or management practices to store carbon or reduce greenhouse gas emissions under the Carbon Credits (Carbon Farming Initiative) Act 2011. The National Greenhouse and Energy Reporting Act 2007 sets out the reporting framework for calculating carbon emissions from industry. National Greenhouse and Energy Reporting will form the basis for calculating permits under any proposed Carbon Pollution Reduction Scheme to be introduced into Australia in the future. 17.1.2 State The Mining Act (1978) is administered by the Department of Mines, Industry Regulation and Safety (DMIRS). Before commencement of any mining operation, a proponent is required to submit a Mining Proposal to the DMIRS. The Mining Proposal describes the project, surrounding environment, potential environmental impacts and proposed prevention and mitigation measures. Commitments made within the Mining Proposal are binding on any future operations within the tenements unless a request for an amendment to the relevant Government authorities is accepted. The Environmental Protection Act 1986 (and Environmental Protection (Amendment) Act 2004) is administered by the Department of Water and Environment Regulation (DWER) and Office of the Environmental Protection Authority (OEPA). There are two key components to this Act that affect St Ives’ operations, being Parts IV and V of the Act. Under Part IV of the Act, projects referred to the former Environmental Protection Authority which are considered likely to have a significant environmental impact may be subject to assessment in accordance with Environmental Impact Assessment, Part IV Division 1. This part of the Act provides for Ministerial Approval for an activity. Part V of the Act provides for the regulation and licencing of environmental harm and the conduct of potentially polluting activities. The DWER regulates industrial emissions and discharges to the environment through a Works Approval and licensing process under Part V of the EP Act. Industrial premises with potential to cause emissions and discharges to air, land or water are known as ‘prescribed premises’ and trigger regulation under the Environmental Protection Act. Prescribed premises categories are outlined in Schedule 1 of the Environmental Protection Regulations 1987.
P a g e 112 | 137 The Environmental Protection Act requires a Works Approval to be obtained before constructing a prescribed industrial premise and makes it an offence to cause an emission or discharge unless a licence or registration is held for the premises. Typically, Works Approval documentation is submitted concurrently with the Mining Proposal. On completion of construction of such infrastructure, completion certificates are required to be submitted to DWER to confirm the infrastructure was constructed in accordance with approved design criteria. In addition, the Contaminated Sites Act 2003 (administered by DWER) has environmental investigation and reporting requirements required by mining operations under this legislation. The Environmental Protection (Clearing of Native Vegetation) Regulations 2004 (administered by DMIRS and DWER) was gazetted in 2004 as part of amendments to the Environmental Protection Amendment Act (2003). It requires all individuals, corporate bodies and private companies to gain formal approval for vegetation clearing in Western Australia prior to any ground disturbing activities commencing. All disturbances relating to mining, processing and related infrastructure require approval under both this framework (including clearing permit exemptions) as well as under the Mining Act. The Rights in Water and Irrigation Act 1914 as administered by DWER is responsible for issuing groundwater licences (GWL) and licences to construct or alter wells (CAW). All tenement holders operating on Mining Act 1978 tenure (except for tenements covered by State Agreements not listed in the regulations) are required to report disturbance data and to contribute annually to the Mining Rehabilitation Fund (MRF). Entry into the MRF was made compulsory for all tenement holders in 2014, with all disturbance data from the Mining Rehabilitation Levy Period 1 July 2014 to 30 June 2015 entered into the DMIRS Environmental Assessment and Regulatory System (EARS) before the end of June 2015. Other key relevant legislation includes: Biodiversity Conservation Act 2016. Conservation and Land Management Act 1984. Country Areas Water Supply Act 1947. Aboriginal Heritage Act 1972. Heritage of Western Australia Act 1990. Environmental Protection Regulations 1987. Environmental Protection (Unauthorised Discharge) Regulations 2004. 17.1.3 SIGMC permitting Approvals for the mining and processing operations on the St Ives Mining Leases were obtained from the DMIRS using the Mining Proposal process. Where applicable, this included referral to Environmental Regulation and Environmental Protection Agency Services (EPAS) Sections of DWER. St Ives is licensed by DWER in accordance with Part V of the Environmental Protection Act 1986 (WA) (Licence number L8485/2010/2). Formal assessment of lake-based mining activities by the former Environmental Protection Authority (now a section of DWER) was undertaken in September 1999 under Part IV of the Environmental Protection Act 1986 with the submission of a Public Environmental Review for mining activities on Lake Lefroy. Ministerial Statement 548 was issued approving the project, subject to conditions, in 2000. Ministerial Statement 879 was issued in November 2011, to replace Ministerial Statement 548, allowing for the expansion of lake-based operations and transfer of the Ministerial Statement from Western Mining Corporation to Gold Fields. The 2011 approval for the lake-based expansion was amended and approved by the former Environmental Protection Authority in December 2016 allowing for further development of the lake-based Mineral reserves. A new approval proposal was referred to the Environmental Protection Authority in December 2016 and was focused on securing approvals or mining lake-based reserves beyond 2018. Findings from this process were supported by the need for
P a g e 113 | 137 more effective site rehabilitation activities. Ministerial Statement 1128 was issued in March 2020 to supersede Ministerial Statement 879. During January 2021, St Ives received approval of the One Mining Proposal from DMIRS aligned with the Mining Proposal Guidelines 2016. The One Mining Proposal consolidates the obligations and conditions from over 200 separate mining approvals for St Ives. An overview of current statutory permitting is provided below. No environmental permitting applications are currently under assessment. Department of Water and Environmental Regulation Ministerial Statement 1128 provides approval for land access and disturbance over a defined part of the St Ives operation. Environmental Licence L8485 provides authorisation of defined polluting activities including processing of ore and dewatering discharge. Ground water licence 171060 provides for abstraction of raw processing water from our production bore field. Ground water Licence 62505 and 205729 provide for dewatering of mining areas. Department of Mines, Industry Regulation and Safety One Mining Proposal RegID 81919 provides for approval for mining related activities, other than exploration, within active and historic mining areas within the operating area. Mine Closure Plan RegID 88163 provides for progressive and end of mine closure and rehabilitation. A range of Programs of Works provide approval for exploration activities across all SIGM tenements. A range of Native Vegetation Clearing Permits for clearing not otherwise addressed by other approvals. Department of Planning, Lands and Heritage Aboriginal heritage surveys are conducted across the site the support mining and exploration activities. A summary of all current SIGMC permits is provided in Table 16.2.1. Table 16.2.1: List of SIGMC permits Number Purpose Registered holder Status Grant date Expiry date Fines MS1128 Access to and disturbance of defined land areas SIGMC Granted 18/03/2020 NA Nil L8485/2010 Operating Licence for polluting activities SIGMC Granted 07/10/2013 06/10/2032 Nil RegID 81919 One Mining Proposal SIGMC Granted 06/01/2021 NA Nil RegID 88163 Mine Closure Plan SIGMC Granted 16/07/2021 16/03/2025 Nil GWL62505 Mine dewatering SIGMC Granted 02/02/2016 01/02/2026 Nil GWL205729 Mine dewatering SIGMC Granted 12/04/2021 11/04/2031 Nil GWL171060 Mt Morgan bore field SIGMC Granted 02/02/2016 01/02/2026 Nil 4696/3 Clearing permit SIGMC Granted 04/02/2012 30/04/2025 Nil 3143/4 Clearing permit SIGMC Granted 29/08/2009 31/01/2025 Nil 4696/3 Clearing permit SIGMC Granted 04/02/2012 30/04/2025 Nil Note: a) The Qualified person has selected a few permits to demonstrate permitting. b) The Qualified person is of the opinion that the licenses are in good standing and that any current or future licensing can and will be obtained for the Mineral reserve or the Mineral resource. c) The Qualified person is of the opinion that St Ives has a good standing with licensing authorities, community groups and that licensing is not expected to be material to reserves or resources.
P a g e 114 | 137 d) St Ives is conducting continues rehabilitation and has a large closure liability (Section 17.6). The Qualified person is of the opinion that the closure estimates and duration are reasonable and practical Source: St Ives CPR, 2021 In addition to making provision and commitment to rehabilitation following mining, West Australia tenement holders with a calculated rehabilitation liability of $50,000 or more are required to pay a levy to the state run Mine Rehabilitation Fund. The payment is based on the operations reported ground disturbance data and is used to fund the safe closure of abandoned mining operations across the state. 17.2 Environmental studies Environmental impact assessments for the St Ives operation were undertaken through the permitting processes and site risk management plans and procedures. St Ives is entitled to mine all declared material falling within its respective Mining Leases with all necessary statutory mining authorisations and permits in place. The large number of environmental and social studies (inclusive of Aboriginal cultural heritage surveys) conducted across the site environmental are described in the Beyond 2018 Project Public Environmental Review and the current approved St Ives Mine Closure Plan. These documents are current and address: Fauna and flora surveys. Heritage surveys. Closure planning review and updates. Contamination/ecotox/hazard investigations. Surface water hydrology and hydrogeological/groundwater modelling. Landform design and engineering for waste landforms. Waste characterisation. Landform decommissioning plans. The Qualified person is of the opinion that the closure and environmental studies are in good standing and are not seen as material to the life of mine reserve 17.3 Waste disposal, monitoring and water management 17.3.1 Tailings storage facilities (TSF) The ANCOLD consequence classification of the St Ives TSFs are: TSFs 1 and 3 – Low TSFs 2 and 4 – High C North Orchin pit and Leviathan pit – Low The previous stability analyses for TSF 2, TSF 3, and TSF 4 were reviewed as part of the recent Coffey audit conducted in September 2021. The stability of all TSFs is acceptable in meeting the minimum required factors of safety. The stability of TSFs 2,3 and 4 will be re-assessed as part of the upcoming GSTM classification study. WAD Cyanide levels in all monitoring wells were below the compliance limit of 0.5 mg/L, with most readings under 0.04 mg/L. Due to the use of hypersaline process water at St Ives, there are site-specific Cyanide Code (ICMC) WAD CN levels set for tailings discharge. These limits require the achievement of the 80th percentile of less than 112 ppm and the 90th percentile of 132 ppm, assessed quarterly. These requirements are being met.
P a g e 115 | 137 InSAR satellite ground stability baseline scans were carried out during Q3 2021 for St Ives, and the results determined that no deformations have been identified on the walls of TSFs 1-4. The piezometric levels for all surface TSFs are almost static, which is consistent with the care and maintenance status of the TSFs and indicates levels are unaffected by seasonal rainfall. The EoR is currently conducting a water management strategy review to improve water management at the Leviathan pit to maximise water return and improve the in-situ density. As of October 2021, the Leviathan pit has an available storage capacity of 28.24 Mt, compared to an LoM tailings throughput of ~29.3 Mt. Five pits, namely Leviathan, Sirius & Britannia, Britannia Footwall & Paddy’s pits, have already received DWER’s approval to receive tailings under existing licence L8485/2010/2. The other pits, including Thunderer, Bellerophon, Africa and Pinnace, will require a DWER permit should they be required for tailings storage. Assuming a stored tailings density of 1.1 t/m³ and total throughput of 29.3 Mt, the Leviathan, Sirius & Britannia pits are required, which will provide a total storage capacity of 31.88 Mt. Therefore, there is no need to obtain additional approval for tailings storage unless reserve requirements change. The TSF s at St Ives are being well managed from a facility safety and governance perspective. a) The Qualified person has the opinion that the procedures and monitoring, water management practices are adequate for the life of mine reserve estimate 17.3.2 Waste rock dumps Design and construction parameters for waste rock landforms are determined through “best practice” materials characterisation and erosion testing and modelling. For new landforms, this process is undertaken as part of the Mining Proposal preparation process and for the existing and “legacy” landforms, these are undertaken as required, for remedial and closure planning. Unless indicated otherwise, each landform/project area has a specific set of design and construction parameters developed, representing a closure concept. The Mine Closure Plan is updated with these details as required at each review. b) The Qualified person is of the opinion that the waste rock dumps at St Ives are adequate for this life of mine reserve plan. Regular waste rock inspections are performed to assess safety. 17.3.3 Water management St Ives holds three groundwater abstraction licences (GWL62505, GWL205729 and GWL171060) administered by the Department of Water and Environmental Regulation (Table 16.2.1). This allocation allows annual combined abstraction of 30,000 Ml and adequately covers St Ives’ maximum possible water abstraction requirements. Current groundwater extraction is below 10,000 Ml/annum. Groundwater monitoring is managed by the site environmental department and is conducted regularly as part of the Department of Water and Environmental Regulation licence and Mining Lease conditions, and Mining Proposal commitments. These monitoring programs include groundwater levels and water quality at the borefields, dewatering pits and surrounding the TSFs. SIGMC obtains groundwater for its processing operations from the Widgiemooltha borefield under licence GWL 171060. Mine dewatering is licensed under GWL 62505(7) and was renewed to allow up to 30 GL of water abstraction and discharge onto Lake Lefroy. Groundwater is pumped from the Widgiemooltha borefield using a buried pipeline. Leak detection is installed to minimise uncontrolled loss and inspections are undertaken every two days. Mine dewatering is undertaken at all operations through a series of sumps. Particle settlement is achieved using in-pit sedimentation basins as well as lined turkey’s nests prior to discharge to Lake Lefroy.
P a g e 116 | 137 Wastewater from the sewage treatment systems is discharged by irrigation to the land. Water is used primarily for processing (approximately 2 - 3 Gl per annum). Water is recycled to the extent possible from tailings facilities using return water dams and holding ponds. Most of the water at St Ives is reused within the mining areas and processing circuits. Storage is largely in settling and storage ponds as well as disused open pits. The key operational areas are also supported with tanks that contain enough surge volume to ensure minimal interruption to business in the event of a pump failure at one of the ponds. Discharges to the environment are licensed under Department of Water and Environmental Regulation license L8485/2010 (Table 16.2.1). This license covers the following regulated processes: Processing or beneficiation of metallic or non-metallic ore. Mine dewatering. Vat or in-situ leaching of metal. Sewage facility. Used tyre storage Putrescible landfill sites. St Ives undertakes a range of water and groundwater monitoring as required by permitting and as good environmental practice to prevent environmental harm. Monitoring includes Ground water level. Ground water quality (metals, acidity, hydrocarbons). Water treatment discharge (metals, hydrocarbon, nutrients) Results from monitoring are reported annually to the relevant regulator. a) The Qualified person is of the opinion that the water balance and procedures are adequate and support the life of mine reserve estimate 17.4 Social and community 17.4.1 Social and community The Indigenous Peoples Strategy provides the framework for a consistent approach to engagement with Aboriginal peoples to improve relationships and mitigate risks to the business. Through the implementation of a Reconciliation Action Plan (RAP), Gold Fields’ sites are in the process of developing appropriate strategies to improve and increase Aboriginal employment outcomes within its workplaces and increase supplier diversity. In 2014, the Ngadju People were successful in having their claim under the Native Title Act 1993 (Cth) (WAD6020/1998) determined by the Federal Court over an area including part of the St Ives property. St Ives was not required to undertake the ‘right to negotiate’ process with the Ngadju People with respect to its tenure. In 2019, a Native Title claim by the Marlinyu Ghoorlie People (WAD647/2017) was registered. This claim also covers part of the St Ives property. SIGMC is currently engaged in early discussions with the Marlinyu Ghoorlie People under the ‘right to negotiate’ process with respect to certain exploration tenure. SIGMC consults with relevant Aboriginal stakeholder groups (including the Ngadju and the Marlinyu Ghoorlie Peoples) to ensure that areas of Aboriginal cultural heritage are identified and recorded. The sites identified during cultural heritage surveys are both archaeological (e.g. flake scatter artefacts) or ethnographic (e.g. an area linked to a story line). Such sites are catalogued and managed in accordance with the Aboriginal Heritage Act (1972) (WA) under site and regional procedures and standards.
P a g e 117 | 137 A number of agreements exist to govern and manage the identification and protection of Aboriginal cultural heritage sites. The Heron leases are subject to such agreements and St Ives is currently negotiating access to these areas with both the Marlinyu Ghoolie and Ngadju Peoples. There is currently a land access and compensation agreement in place with the Mt Monger pastoral station on which much of the St Ives operational area is situated. SIGMC also engages in a range of people-related development activities in the communities in which the mines are situated. Ongoing support for host communities includes health improvement and school retention programs, support of regional community events, Indigenous procurement and employment, and the promotion of STEM (science, technology, engineering and mathematics) at schools. St Ives has a scorecard to ensure host community procurement and employment meet internal targets. Gold Fields partners with Football West. The commitment and support to Football West is based on their impressive record of growth of the sport in Western Australia, their commitment and focus at a regional level, cultural diversity, inclusiveness and gender diversity. Gold Fields also sponsors Netball WA. Gold Fields is also a member of the Gold Industry Group that represents the interests of gold producers, explorers and service providers to collectively champion, educate and promote the importance of the gold sector in Australia. 17.4.2 Native Title and Heritage The Indigenous Peoples Strategy provides the framework for a consistent approach to engagement with Aboriginal peoples to improve relationships and mitigate risks to the business. Through the implementation of a Reflect Reconciliation Action Plan (RAP), Gold Fields sites are in the process of developing appropriate strategies to improve and increase Aboriginal employment outcomes within its workplaces and increase supplier diversity. In 2014, the Ngadju People were successful in having their claim under the Native Title Act 1993 (Cth) (WAD6020/1998) determined by the Federal Court over an area including part of the St Ives property. St Ives was not required to undertake the ‘right to negotiate’ process with the Ngadju People with respect to its tenure. In 2019, a Native Title claim by the Marlinyu Ghoorlie People (WAD647/2017) was registered. This claim also covers part of the St Ives property. SIGMC is currently engaged in early discussions with the Marlinyu Ghoorlie People under the ‘right to negotiate’ process with respect to certain exploration tenure. SIGMC consults with relevant Aboriginal stakeholder groups (including the Ngadju and the Marlinyu Ghoorlie Peoples) to ensure that areas of Aboriginal cultural heritage are identified and recorded. The sites identified during cultural heritage surveys are both archaeological (e.g. flake scatter artefacts) or ethnographic (e.g. an area linked to a story line). Such sites are catalogued and managed in accordance with the Aboriginal Heritage Act (1972) (WA) under site and regional procedures and standards. A number of agreements exist to govern and manage the identification and protection of Aboriginal cultural heritage sites. St Ives is currently negotiating access to various areas across the tenement package with both the Marlinyu Ghoolie and Ngadju Peoples. There is currently a land access and compensation agreement in place with the Mt Monger pastoral station on which much of the St Ives operational area is situated. SIGMC also engages in a range of people-related development activities in the communities in which the mines are situated.
P a g e 118 | 137 Ongoing support for host communities include health improvement and school retention programs, support of regional community events, Indigenous procurement and employment, and the promotion of STEM (science, technology, engineering and mathematics) at schools. St Ives has a scorecard to ensure host community procurement and employment meet internal targets. Gold Fields partners with Football West. The commitment and support to Football West is based on their impressive record of growth of the sport in Western Australia, their commitment and focus at a regional level, cultural diversity, inclusiveness and gender diversity. Gold Fields also sponsors Netball WA. Gold Fields is also a member of the Gold Industry Group that represents the interests of gold producers, explorers and service providers to collectively champion, educate and promote the importance of the gold sector in Australia. 17.5 Mine closure St Ives has an up-to-date mine closure plan, approved by DMIRS in 2021. The plan has been developed in accordance with legal requirements and Gold Fields guidance, which aligns with the International Council of Mining and Metals (ICMM) guidance The Mine Closure Plan determines the mine closure requirements and calculates the financial or closure cost liability associated with closure. The Mine Closure Plan identifies the baseline description, the closure vision or objectives, risks and opportunities, and closure activities, which include stakeholder engagement, decontamination, dismantling, re-profiling and revegetation of land or landforms, maintenance and monitoring, including post closure water monitoring (after rehabilitation is completed). The operation has a Progressive Rehabilitation Plan (PRP), developed in accordance with the approved Mine Closure Plan and Group guidance. The operation sets annual targets for the implementation of the PRP and tracks performance against these targets. These include the recent rehabilitation of Diana, Bellerophon and West Idough waste rock landforms, as well as Blue Lode, Junction open pits and the former St Ives processing mill. Monitoring of closure objectives is undertaken utilising an in-house Closure Monitoring Protocol. Monitoring data and results are reported annually as part of St Ives’s Annual Environmental Report. Existing cash resources are utilised to fund the progressive rehabilitation activities. St Ives, as a tenement holder, is required to report disturbance data, and to contribute annually to the Mining Rehabilitation Fund (MRF) in accordance with the requirements of the Mining Act. St Ives have developed their closure cost estimate using the Standardised Reclamation Cost Estimator (SRCE) model. Closure costs are reviewed every year to reflect actual and proposed disturbances and changes in closure requirements. The estimated closure cost for life-of-mine is calculated, as of 31 December 2021, as $ 116 m (excluding taxes). Financial provision for rehabilitation, closure and post closure obligations is met through existing cash reserves. The SRCE closure cost estimate, developed for asset retirement obligation purposes, is updated and reviewed externally annually, by an independent consultant, and reviewed annually as part of the Group financial assurance. The Qualified person is of the opinion that the status of St Ives current Mine Closure Plan is in good standing and will allow for the development to meet its rehabilitation and closure obligations and remain in good standing with the community and regulators.
P a g e 119 | 137 18 Capital and operating costs The operating and capital cost estimates are based on recent historic performance and the Mineral reserve techno- economic study. 18.1 Capital costs The capital costs are based on detailed requirements for the next two years and have in general an order of accuracy of ±10 %. Capital estimates beyond two years, are based on pre-feasibility or better estimates for infrastructure and development requirements for individual projects. The capital costs for St Ives includes items classified as project capital, sustaining capital and development capital. The forecast capital costs are summarised in Table 18.1.1. Table 18.1.1: Capital costs Capital cost Units 2022 2023 2024 2025 2026 2027 2028 2029 2030 Mining MP&Dev $ million 73.7 36.1 44.2 30.5 16.6 3.1 0.0 0.0 0.0 Mining Capital Works $ million 13.4 21.7 14.8 15.6 15.9 16.4 16.0 14.1 6.7 Processing (incl. TSFs) $ million 2.2 2.8 2.5 3.0 3.0 2.2 1.2 1.2 0.0 G&A Capital $ million 6.3 17.1 17.0 1.9 1.9 1.9 0.4 0.4 0.0 Exploration $ million 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Capital $ million 96.6 78.8 79.5 52.0 38.4 24.6 18.6 16.7 7.7 Note: a) The capital costs are based on the 31 December 2021 life of mine schedule for proven and probable reserves. The Mineral resource and exploration required to replace depletion is not included in this techno-economic assessment. b) No inferred Mineral resource is included in the life of mine processing schedule or techno-economic evaluation. c) Exploration costs are limited to one year when scheduling life of mine Mineral reserves. Over and above the reserve Gold Fields is expecting to spend between $80 million and 100 million per annum on reserve generation exploration to replace depletion with approximately a quarter share going to St Ives. d) Closure cost is ‘Day of Assessment’ as at 31 December 2021 with life of mine disturbance rehabilitation added. e) Tailings storage facilities are costed according to the life of mine requirements. The current in-pit tailings storage facility is expected to have reached capacity before the reserve life of mine is consumed. The cost of the replacement facility is included in the tecno-economic model. Source: St Ives CPR, 2021 18.2 Operating costs Operating costs are based on general planning assumptions, or project-specific planning assumptions where applicable. The unit operating cost for processing is $14.28/t (A$19.29/t) with additional costs applied for surface haulage, capital works and rehabilitation. Operating costs for the Lefroy processing facility are expected to remain steady over the next few years. The risk of upward pressure on operating costs arises from potential rises in the cost of power and labour, and the effect of water quality on reagent consumption. The forecast operating costs are summarised in Table 18.2.1. Table 18.2.1: Operating costs Operating cost Units 2022 2023 2024 2025 2026 2027 2028 2029 2030 Mining $ million 146.0 163.0 142.6 153.2 155.6 136.3 122.5 105.8 52.3 Processing $ million 69.6 68.0 48.9 48.8 43.3 42.1 41.8 39.8 19.5 G&A Operating $ million 46.4 46.2 36.2 36.3 33.6 33.0 32.9 31.8 27.4 Other operating costs $ million 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Operating costs $ million 262.1 277.2 227.6 238.2 232.5 211.5 197.1 177.3 99.1 Note: a) The operating costs are based on the 31 December 2021 life of mine schedule for proven and probable reserves. The Mineral resource and exploration required to replace depleted reserves is no included in this techno-economic assessment b) No inferred Mineral resource is included in the life of mine processing schedule or techno-economic evaluation. c) Costs are first principles based on the Mineral reserve life of mine schedule. Source: St Ives CPR, 2021
P a g e 120 | 137 Qualified persons notes on capital and operating cost estimates: b) The Qualified person is of the opinion that recent historic performance and the Mineral reserve tecno-economic study. The levels of accuracy are the same as a pre-feasibility study at an estimated accuracy of ±25 % and require no more than 15 % contingency. The specific engineering estimation methods are equal or better than estimated c) St Ives has improved capital estimation and capital delivery through the application of Group Capital Standards, review or capital projects by a select team, and improved implementation planning. Gold Fields also perform post investment reviews across the capital studies and share key learnings. The review team are adapted at analysing capital studies. d) The group strategic planning cycle helps align the business plans and Mineral reserves. At St Ives there is a blend of three underground mining areas and open pits. The strategic planning assists with optimising the blend and balancing of capital expenditure. e) Gold Fields two-year business planning cycle captures operating and capital costs along with key physicals and revenue. The business plans are internally reviewed, presented to the executive for approval, prior to sanctioning by the Gold Fields board of directors. The business plans are aligned with the Registrant’s strategic direction. The business planning and strategic planning balance the groups planned capital expenditure, by ranking capital requirements. f) Capital expenditure once sanctioned must follow the group capital reporting standard. Monthly and quarterly reviews are held to interrogate capital, operating, unit cost, physicals, plan execution and revenue streams. g) The Mineral reserves are supported by this review process. Reserves follow a similar review and approval process. Mineral reserves are only approved if they have the required level of study.
P a g e 121 | 137 19 Economic analysis 19.1 Key inputs and assumptions The Mineral reserve LoM physical inputs are summarised in Table 19.1.1. Table 19.1.1: LoM physical, operating cost and capital cost inputs and revenue assumptions Sources Units 2022 2023 2024 2025 2026 2027 2028 2029 2030 Underground LoM Processed koz 296.7 220.5 192.9 232.7 232.8 242.1 266.0 233.9 98.5 Recovery % 94.0 93.3 94.0 94.0 94.2 94.3 94.2 94.3 94.1 Sold koz 284.0 205.6 182.6 218.7 220.3 228.4 250.7 221.2 97.1 Open Pit LoM Processed koz 62.7 156.3 68.8 55.3 12.5 0.0 0.0 0.0 0.0 Recovery % 94.0 92.7 94.0 94.3 92.1 0.0 0.0 0.0 0.0 Sold koz 60.0 144.9 65.6 52.3 11.5 0.0 0.0 0.0 0.0 Stockpiles LoM Processed koz 37.6 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Recovery % 94.0 81.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sold koz 36.0 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sold koz 380.0 352.7 248.2 271.0 231.8 228.4 250.7 221.2 97.1 Costs, Revenue and Cashflow Revenue $ million 494.8 458.5 322.6 352.3 301.3 296.9 325.9 287.6 126.3 Operating Costs $ million 262.1 277.2 227.6 238.2 232.5 211.5 197.1 177.3 99.1 Capital Costs $ million 96.6 78.8 79.5 52.0 38.4 24.6 18.6 16.7 7.7 Other $ million 12.4 32.0 44.0 38.7 25.3 18.9 13.7 7.1 28.6 Royalties $ million 12.3 15.1 10.6 11.6 9.9 9.8 10.8 9.5 4.2 Government levies $ million 0 0 0 0 0 0 0 0 0 Interest (if applicable) $ million 0 0 0 0 0 0 0 0 0 Total Costs (Excluding Tax) $ million 383.4 403.1 361.8 340.6 306.2 264.8 240.1 210.6 139.6 Taxes $ million 18.1 12.8 0.0 0.0 0.0 4.1 23.4 18.3 0.0 Cash flow $ million 54.4 24.2 -17.3 30.7 12.8 39.0 68.4 58.4 5.1 Discounted cashflow at 3.8 % (NPV) $ million 93.3 41.1 -36.4 10.4 -4.2 23.3 49.8 45.2 -9.9 Note: a) The capital costs are based on the 31st December 2021 life of mine schedule for proved and probable Reserve only. The Mineral resource and exploration required to replace dealation is no included in this techno-economic assessment. b) No Inferred Mineral resource is included in the life of mine processing schedule or techno-economic evaluation. Source: St Ives CPR, 2021 The financial assumptions on which the economic analysis is based include: All assumptions are on 31 December 2021 money terms consistent with the valuation date. Royalties on revenue is consistent with relevant legislation (2.5 % ad valorem). Gold Fields operations are considered as a unit for taxation purposes and assessed losses and capital expenditure can be offset against corporate taxes. The real base-case discount rate of 3.8 % is determined by Gold Fields Corporate Finance annually. A 30 % corporate tax rate. A closure liability of $118.3 million. Discounted cashflow (DCF) applied to post-tax, pre-finance cashflows and reported in financial years ending 31 December.
P a g e 122 | 137 Table 19.1.2 has the breakdown of ESG expenditure included in Table 18.1.1, Table 18.2.1and Table 19.1.1. Table 19.1.2: LoM cost and revenue assumptions – Breakdown of ESG Sources Units 2022 2023 2024 2025 2026 2027 2028 2029 2030 Progressive Closure* $ million 17.6 16.6 18.8 20.5 19.7 12.5 8.7 4.1 0.8 Note: * Costs included in capital costs (Table 18.1.1, Table 18.2.1and Table 19.1.1). Source: St Ives CPR, 2021 19.2 Economic analysis The NPV for St Ives based on the DCF forecast at a 3.8 % discount rate using the scheduled Mineral reserves in the LoM plan is $206.9 million. 19.3 Sensitivity analysis Sensitivity analyses were performed to ascertain the impact on NPV to changes in capital, operating costs, discount rate and gold price as summarised in Table 19.3.1 to Table 19.3.4. Table 19.3.1: NPV sensitivity to changes in gold price Gold Price - real -15 % -10 % -5 % 0 % +5 % +10 % +15 % +25 % +31 % Gold Price ($/oz) 1,105 1,170 1,235 1,300 1,365 1,430 1,495 1,625 1,700 NPV ($ million) -54.6 48.7 131.9 206.9 281.1 354.9 428.6 257.0 660.3 Source: St Ives CPR, 2021 Table 19.3.2: NPV sensitivity to changes in grade Grade -15 % -10 % -5 % 0 % +5 % +10 % +15 % NPV ($ million) -127.8 -15.7 95.8 206.9 218.3 229.7 564.1 Source: St Ives CPR, 2021 Table 19.3.3: NPV sensitivity to changes in capital costs Capital costs -15 % -10 % -5 % 0 % +5 % +10 % +15 % NPV ($ million) 223.6 218.1 212.6 206.9 201.2 195.3 189.3 Source: St Ives CPR, 2021 Table 19.3.4: NPV sensitivity to changes in operating costs Operating costs -15 % -10 % -5 % 0 % +5 % +10 % +15 % NPV ($ million) 219.8 215.5 211.2 206.9 202.7 198.4 194.1 Source: St Ives CPR, 2021 Table 19.3.5: NPV sensitivity to changes in discount rate Discount rate 2 % 3 % 3.8 % 5 % NPV ($ million) 217.5 211.4 206.9 200.3 Source: St Ives CPR, 2021 The Qualified person is of the opinion that the tecno-economic model based on the Mineral reserve physicals. The Recent historic assumptions are used to test the Mineral reserve economic assumptions. The material assumptions have been found to be valid and used in the tecno-economic studies. The discounted cashflow has economic viability and a NPV of $206.9 million at a discount rate of 3.8 %. The IRR has not been presented for this tecno-economic study. The tecno-economic study for the Mineral reserves excludes all inferred Mineral resource material.
P a g e 123 | 137 20 Adjacent properties There are many companies and individuals that control tenements adjacent to St Ives. Material adjacent gold properties include: Karora Resources Inc (TSX: KRR) - operator of the Beta Hunt Gold Mine to the immediate north of St Ives under a sub-lease agreement with SIGMC. Northern Star Resources Ltd (ASX: NST) - operator of the South Kalgoorlie Gold Mine to the north of St Ives. Anglo Australian Resources NL (ASX: AAR) at its Mandilla Gold Project to the west of St Ives. Maximus Resources (ASX MXR) at Wattle Dam. Adjacent nickel properties include: Black Mountain Metals at its Lanfranchi Nickel Project to the south of St Ives. Lunnon Metals Ltd (ASX: LM8) at Foster and Jan within the St Ives property (SIGMC retains gold rights). Mincor Resources Ltd (ASX: MCR) at Long, Otter and Durkin to the north of St Ives. The Qualified person is unable to verify the information and that the information is not necessarily indicative of the mineralisation on the property that is the subject of the technical report summary The Qualified person is of the opinion that St Ives is essentially stand alone and has no or little reliance of neighboring properties The Qualified person is of the opinion that the proximity of workings are not expected to interact in any way The Qualified person is of the opinion that the lease and permit areas are not overlapping in any way
P a g e 124 | 137 21 Other relevant data and information Gold Fields’ commitment to materiality, transparency and competency in its Mineral resources and Mineral reserves disclosure to regulators and in the public domain is of paramount importance to the Qualified person and the Registrants Executive Committee and Board of Directors continue to endorse the company’s internal and external review and audit assurance protocols. This Technical Report Summary should be read in totality to gain a full understanding of St Ives’s Mineral resource and Mineral reserve estimation and reporting process, including data integrity, estimation methodologies, modifying factors, mining and processing capacity and capability, confidence in the estimates, economic analysis, risk and uncertainty and overall projected property value. However, to ensure consolidated coverage of the company’s primary internal controls in generating Mineral resource and reserve estimates the following key point summary is provided: a) A comprehensive quality assurance and quality control (QA/QC) protocol is embedded at St Ives and all Gold Fields operations. It draws on industry leading practice for data acquisition and utilises national standards authority accredited laboratories which are regularly reviewed. Analytical QA/QC is maintained and monitored through the submission of sample blanks, certified reference material and duplicates and umpire laboratory checks. b) Corporate Technical Services (CTS), based in Perth, comprises subject matter experts across the disciplines of geology, resource estimation, geotechnical, mining, engineering, modernisation, capital projects, processing, metallurgy, tailings management and Mineral resource and reserve reporting governance. The CTS team budget for regular site visits to all operating mines when emphasis is placed on-site inspection and direct engagement with the technical staff to drive protocols and standards and enable on-site training and upskilling. CTS provides technical oversight and guidance to the operating Regions and mines and ensures an additional level of assurance to the Mineral resource and reserve estimates to supplement the mine sites and Regional technical teams. c) Independent audit review of fixed infrastructure is conducted annually with the appointed insurance auditor focussed on plant, machinery and mine infrastructure risks. An effective structural and corrosion maintenance programme with benchmark inspections is in place supported by equipment condition monitoring major critical component spares. Focus areas include the primary jaw crusher, ball mill shell or motor failure, structural failure of plant or conveyor, process tank failure and large transformer failure. Critical spares are well resourced and there are no large items not supported by on-site spares holdings. d) Mobile equipment is largely owned and well maintained by the mining contractor, with development and haulage units at owned by St Ives. There is some spare capacity in most of the fleets with the option of hire units that are readily available in the region. e) Processing controls include the preparation of quarterly plant metal accounting reconciliation reports by the mine sites which are reviewed by the Regional Metallurgical Manager and VP Metallurgy in the CTS team. Any monthly reconciliation variance outside the limits provided within the Gold Fields Plant Metal Accounting Standard is flagged for follow up assessment and remediation if warranted. f) St Ives has a tailings management plan that promotes risk minimisation to operators and stakeholders over the lifecycle of each tailings storage facility (TSF). St Ives’s TSF’s are operated in accordance with the company TSF Management Guidelines which are aligned with the International Council on Metals & Mining’s (ICMM) Position Statement on preventing catastrophic failure of TSFs (December 2016). Active TSFs are subject to an independent, external audit every three years, as well as regular inspections and formal facility safety reviews by formally appointed Engineers of Record (EoR). Further improvements in tailings management are expected through achievement of compliance with the new independently developed Global Industry Standard for Tailings Management (GISTM) issued in 2020. g) The integration of Environmental, Social and Governance (ESG) themes into the estimation process continues as an important consideration for modifying factors, reasonable prospects for economic extraction (RPEE) assessments and to underpin the integrity of the Mineral resources and Mineral reserves. The company’s ESG Charter, issues and priorities are fully considered in the life of mine plan with particular emphasis on tailings
P a g e 125 | 137 management, integrated mine closure planning, security of energy and water and the social and regulatory license to operate. h) Gold Fields also follows an embedded process of third-party reviews to provide expert independent assurance regarding Mineral resource and Mineral reserve estimates and compliance with relevant reporting rules and codes. In line with Gold Fields policy, every material property is reviewed by an independent third-party on average no less than once every three years, or when triggered by a material year-on-year change. Certificates of compliance are received from the companies that conduct the external audits which are also configured to drive continuous improvement in the estimation process. i) Importantly, Gold Fields endorses a well embedded risk and control matrix (RACM) configured to provide an annual assessment of the effectiveness of the registrants’ internal controls concerning the life of mine planning process and mineral resource and reserve estimation and reporting. j) The internal controls include coverage of the following (inter alia): i Reasonableness of parameters and assumptions used in the mineral resource and reserve estimation process ii Reasonableness of the interpretations applied to the geological model and estimation techniques iii Integrity in the mine design and scheduling, including reasonableness of the mine planning assumptions, modifying factors, cut-off grades, mining and processing methods and supporting key technical inputs such as year on year reconciliation, geotechnical, mining equipment, infrastructure, water, energy and economic analysis iv Provision of the necessary skills, experience and expertise at the mine sites and the Regions to undertake and complete the work with the required level of technical ability and competency, including professional registration as a Qualified person v Alignment with the SK 1300 rule (guidance and instruction) for the reporting of mineral resources and reserves vi Review of the disclosure of the registrants’ mineral resources and reserves process. k) Because of its inherent limitations, internal controls may not prevent or detect all errors or misstatements. Also, projections of any valuation of effectiveness to future periods are subject to risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with policies and procedures may deteriorate RCubed® is a proprietary cloud-based reporting system adopted by Gold Fields in 2021 to enhance the level governance and data security concerning Mineral resource and reserve reporting across all company properties. It ensures transparency and auditability for all data verification checks, information stage gating, the approvals process and confirmation of Qualified person credentials. The RCubed® reporting system is being incorporated into the risk and control matrix RACM matrix to support the December 2021 Mineral resource and reserve reporting.
P a g e 126 | 137 22 Interpretation and conclusions The views expressed in this technical report summary are based on the fundamental assumption that the required management resources and management skills are in place to achieve the Mineral reserve LoM plan projections for St Ives. The St Ives Mineral reserves currently support a 9 year LoM plan that values the operation at $206.9 million at the reserve gold price of $1,300/oz. Climate change is an integral part of the mineral reserve generation process and incorporating relevant costs associated with climate change, primarily decarbonisation, mitigation and adaptation to the changing climate, is a key theme for the Company. Integration of these key elements into the mineral reserve process is being carried out progressively and simultaneously across all of Gold Fields’ sites. SIGMC continues to discover and replace Mineral reserves that contribute to sustained growth and extending the LoM profile. Ongoing investment in exploration and infrastructure is justified by the positive economic analysis. The Mineral reserve estimates contained in this report should not be interpreted as assurances of the economic life or the future profitability of St Ives. Mineral reserves are only estimates based on the factors and assumptions described herein, thus future Mineral reserve estimates may need to be revised. For example, if production costs increase or product prices decrease, a portion of the current Mineral resources, from which the Mineral reserves are derived, may become uneconomic and would therefore result in a lower estimate of Mineral reserves. The LoM plan includes forward-looking technical and economic parameters and involve a number of risks and uncertainties that could cause actual results to differ materially. The LoM plan for St Ives has been reviewed in detail by the Qualified person for appropriateness, reasonableness and viability, including the existence of and justification for departure from historical performance. The Qualified person considers that the Technical Economic Parameters and Financial Models are based on sound reasoning, engineering judgement and technically achievable mine plan, within the context of the risk associated with the gold mining industry. The business of gold mining by its nature involves significant risks and hazards, including environmental hazards and industrial accidents. In particular, hazards associated with Gold Fields’ underground mining operations include: Rock bursts. Seismic events. Underground fires and explosions. Cave-ins or gravity falls of ground. Discharges of gases and toxic substances. Flooding. Accidents related to the presence of mobile machinery. Ground and surface water pollution. Ground subsidence. Other accidents and conditions resulting from drilling, blasting and removing and processing material from an underground mine. Hazards associated with Gold Fields’ surface operations may include: Accidents associated with operating a rock dump and production stockpile, and rock transportation equipment. Production disruptions due to weather. Tailings facility collapses. Ground and surface water pollution.
P a g e 127 | 137 Gold Fields may also be subject to actions by labour groups or other interested parties who object to perceived conditions at the mines or to the perceived environmental impact of the mines. These actions may delay or halt production or may create negative publicity related to Gold Fields. If Gold Fields experiences losses of senior management or is unable to hire and retain sufficient technically skilled employees, its business may be materially and adversely affected. Gold Fields may also suffer adverse consequences from: The reliance on outside contractors. Changes in environmental and health and safety laws and regulations. Native Title claims and Aboriginal heritage sites. Gold Fields is at risk of experiencing any of these hazards. The occurrence of any of these hazards could delay or halt production, increase production costs and result in a liability for Gold Fields. 22.1 Risks The major risks and mitigation actions at St Ives are based on a formal risk review and assessment using risk ranking software are summarised in Table 22.1.1. Senior management review and update the risk register on a routine basis and is reported on a quarterly basis. Table 22.1.1: Risks and mitigating actions Risk description Risk mitigating action Revenue Gold Fields’ revenues are primarily derived from the sale of gold that it produces. To the extent that Gold Fields does not enter into forward sales, derivatives or other hedging arrangements in order to establish a price in advance of the sale of its gold production, it is exposed to changes in the gold price, which could lead to variation in LoM cashflow, Mineral reserves and mine life. Business restructuring and modernisation initiatives to improve safety, increase efficiency and reduce costs. Business planning process with execution monitored through regular cost, capital and production reviews. Ongoing portfolio optimisation for cash generation. Gold and copper production hedging in selected areas. Exploration Exploration activities are focused on replacing production depletion and on growth in Mineral reserves to maintain operational flexibility and sustainability. Exploration for gold and other metals associated with gold are speculative in nature involves many risks and is frequently unsuccessful. The Company focuses on the extension of existing orebodies and the discovery and delineation of new orebodies both at existing sites and at undeveloped sites. Best practices exploration techniques, technical peer reviews and technical specialists are employed to assist in conceptual targeting, execution and interpretation of the exploration programs. Geological, geochemical, geophysical, geostatistical and geo-metallurgical techniques are constantly refined to improve effectiveness and the economic viability of prospecting and mining activities. Once a potential orebody has been discovered, exploration is extended and intensified in conjunction with comprehensive infill drilling to enable clearer definition of the orebody and its technical and economic probability. Reserves published do not require any additional discovery. Geology & estimation The primary assumptions of continuity of the geologically homogenous zones are driven by the geological model, which is updated when new information arises. Any changes to the model are subject to peer and internal technical corporate review and external independent consultant review when deemed necessary. At the Australian operations, the estimation of Mineral reserves for both underground and open pit operations is based on exploration and sampling information gathered through appropriate techniques, primarily from DD, RC and AC drilling techniques. Gold Fields and the sites have well documented processes, procedures and systems to ensure appropriate drilling, logging, sampling interpretation, geology orebody and lithological modelling, and estimation are appropriately completed. Overall staff focus is on geology recruitment with required expertise and skills training coupled with field and peer reviews by both site and corporate staff are integrated into routine exploration and mining geology. Internal and external corporate audits, procedures and systems all enhance and support ongoing periodic review. All models are documented with peer reviews and model on model reconciliations to explore and understand the impacts of additional information, data and interpretation / methodology to support delivery of the most appropriate and best informed outcomes. Applications of alternative estimation methods to evaluate deposits are also routinely compiled to ensure the most relevant and appropriate estimation for mine planning is delivered. This may include considering OK, SK, and simulation. Conditional estimation techniques to validate and inform options and decisions are also considered. The locations of sample points are spaced close enough to deduce or confirm geological and grade continuity. Generally, drilling is undertaken on grids, which range between 10 m by 10 m up to 50 m by 50 m, although this may vary depending on the continuity of the orebody. Due to the variety and diversity of mineralisation at the Australian operations, sample spacing may also vary depending on each particular ore type.
P a g e 128 | 137 Risk description Risk mitigating action Mine planning & scheduling Changes in assumptions underlying Gold Fields’ Mineral reserve estimates risk. Modifying factors used to calculate the cutoff grades include adjustments to mill delivered amounts due to dilution and ore loss incurred in the course of mining, expected return on investment, and sustaining capital. These may change but typically are reviewed and managed through detailed reconciliation processes to minimise variations and impacts. Modifying factors applied in estimating reserves are primarily based on historical empirical information, but commonly incorporate adjustments for planned operational improvements. Mineral reserves also take into account operating cost levels as well as necessary capital and sustaining capital provisions required at each operation and are supported by LoM plans. Detail planning protocols and review processes by qualified and experienced technical staff both on site and regional levels are held to ensure consistency and applicability of due process. Mining execution The ability to achieve anticipated efficiencies and production plans due to nature of risk and impacts associated with normal mining routine activities. These could include geotechnical, equipment and maintenance, explosives, staffing, power and water supply. Benchmarking and technical reviews of all mine plans to validate and test assumptions are normal Mineral resource & reserve processes. Assumptions applied in estimating mine planning for Mineral reserves are primarily based on historical empirical information, but commonly incorporate adjustments for planned operational performance. Equipment planned schedule and maintenance programs and condition monitoring processes are in place to ensure production capability. Geotechnical Geotechnical evaluation and monitoring, seismic systems and slope wall rock monitoring are all normal processes to mitigate risk. Underground geotechnical risk includes the impact of seismicity on operations, which may result in unplanned delays, closure, or falls of ground. Worse than predicted overbreak or poor mining recovery, due to geotechnical failures in stoping may also result in lower than predicted gold production. Ground control management plans are used to manage the geotechnical risk at St Ives. Social licence to operate Many mining companies face increasing pressure over their “social license to operate” which can be understood as the acceptance of the activities of these companies by local stakeholders. While formal permission to operate is ultimately granted by host governments, many mining activities require social permission from host communities and influential stakeholders to carry out operations effectively and profitably. This aspect could impact future Mineral reserves & resources, mining activity and delivery. To maintain its social license to operate, Gold Fields may need to design or redesign parts of its mining operations to minimise their impact on such communities and the environment, either by changing mining plans to avoid such impact, by modifying operations, changing planned capital expenditures or by relocating the affected people to an agreed location. Responsive measures may require Gold Fields to take costly time-consuming remedial measures, including the full restoration of livelihoods of those impacted. Staffing & technical capability Gold Fields’ ability to operate or expand effectively depends largely on the experience, skills and performance of its senior management team and technically skilled employees. Gold Fields Australia operates in a good labour market and stable political jurisdiction which adapts recruitment, staff development / retention policies to meet labour and staffing demand to support and deliver on operations. Environmental and industrial accidents Gold mining by its nature involves significant risks and hazards, including environmental hazards and industrial and mining accidents. These may include, for example, seismic events, fires, cave-ins and blockages, flooding, discharges of gases and toxic substances, contamination of water, air or soil resources, radioactivity and other accidents or conditions resulting from mining activities including, among other things, blasting and the transport, storage and handling of hazardous materials. Gold Fields has appropriate staffing structures and processes and programs which manage, monitor and report on key environmental, health and safety compliance. Gold Fields also subscribes to a number of international regulatory frameworks (e.g. ISO14001, ISO18001, ISO45001, Cyanide Code) which include process and external audits review and monitoring for compliance. Note: a) The Qualified person is of the opinion that the risks identified have reasonable risk mitigations and that action plans current and future will not materially affect the life of mine reserve estimation. Source: St Ives CPR, 2021
P a g e 129 | 137 23 Recommendations Ongoing exploration and geological interpretation suggest that the St Ives property has the potential to extend and replace existing Mineral resources and reserves. It is recommended that further exploration is carried out at the following areas which have a good probability of extending mine life: The Qualified person is of the opinion that the reserve life of mine as a single phase and is costed accordingly The Qualified person is of the opinion that the normal process for converting Mineral resources to Mineral reserves to offset depletion
P a g e 130 | 137 24 References The primary reference documents that have written consent by the appointed Gold Fields Lead Qualified persons technical report summary are. Primary reference is the St Ives Competent Person Report 31 December 2021 for Mineral resources and Mineral reserves. This report has written consent from Mike Fitzgerald who is the Gold Fields appointed lead Qualified person for St Ives Gold Mine. Mike has accepted responsibility for the Competent Person Report 31 December 2021 for Mineral resources and Mineral reserves as a whole. The St Ives Competent Person Report 31 December 2021 for Mineral resources and Mineral reserves is referred to in this document as “St Ives CPR 2021”.
P a g e 131 | 137 25 Reliance on information provided by the Registrant The competent person has not identified any information provided by the Registrant for St Ives that requires noting under the reliance on information provided.
132 | 137 26 Definitions 26.1 Adequate geological evidence When used in the context of Mineral resource determination, means evidence that is sufficient to establish geological and grade or quality continuity with reasonable certainty. 26.2 Conclusive geological evidence When used in the context of Mineral resource determination, means evidence that is sufficient to test and confirm geological and grade or quality continuity. 26.3 Cutoff grade Is the grade (i.e., the concentration of metal or mineral in rock) that determines the destination of the material during mining. For purposes of establishing “prospects of economic extraction,” the cutoff grade is the grade that distinguishes material deemed to have no economic value (it will not be mined in underground mining or if mined in surface mining, its destination will be the waste dump) from material deemed to have economic value (its ultimate destination during mining will be a processing facility). Other terms used in similar fashion as cutoff grade include net smelter return, pay limit, and break-even stripping ratio. 26.4 Development stage issuer Is an issuer that is engaged in the preparation of Mineral reserves for extraction on at least one Material property. 26.5 Development stage property Is a property that has Mineral reserves disclosed, pursuant to this subpart, but no material extraction. 26.6 Economically viable When used in the context of Mineral reserve determination, means that the Qualified person has determined, using a discounted cash flow analysis, or has otherwise analytically determined, that extraction of the Mineral reserve is economically viable under reasonable Investment and market assumptions. 26.7 Exploration results Are data and information generated by mineral exploration programs (i.e., programs consisting of sampling, drilling, trenching, analytical testing, assaying, and other similar activities undertaken to locate, investigate, define or delineate a mineral prospect or mineral deposit) that are not part of a disclosure of Mineral resources or Mineral reserves. A Registrant must not use exploration results alone to derive estimates of tonnage, grade, and production rates, or in an assessment of economic viability. 26.8 Exploration stage issuer Is an issuer that has no Material property with Mineral reserves disclosed. 26.9 Exploration stage property Is a property that has no Mineral reserves disclosed. 26.10 Exploration target Is a statement or estimate of the exploration potential of a mineral deposit in a defined geological setting where the statement or estimate, quoted as a range of tonnage and a range of grade (or quality), relates to mineralisation for which there has been insufficient exploration to estimate a Mineral resource.
P a g e 133 | 137 26.11 Feasibility study Is a comprehensive technical and economic study of the selected development option for a mineral project, which includes detailed assessments of all applicable Modifying factors, as defined by this section, together with any other relevant operational factors, and detailed financial analysis that are necessary to demonstrate, at the time of reporting, that extraction is Economically viable. The results of the study may serve as the basis for a final decision by a proponent or financial institution to proceed with, or finance, the development of the project. 1. A feasibility study is more comprehensive, and with a higher degree of accuracy, than a Preliminary feasibility study (or pre-feasibility study). It must contain mining, infrastructure, and process designs completed with sufficient rigor to serve as the basis for an investment decision or to support project financing. 2. The confidence level in the results of a feasibility study is higher than the confidence level in the results of a Preliminary feasibility study (or pre-feasibility study). Terms such as full, final, comprehensive, bankable, or definitive feasibility study are equivalent to a feasibility study. 26.12 Final market study Is a comprehensive study to determine and support the existence of a readily accessible market for the mineral. It must, at a minimum, include product specifications based on final geologic and metallurgical testing, supply and demand forecasts, historical prices for the preceding five or more years, estimated long term prices, evaluation of competitors (including products and estimates of production volumes, sales, and prices), customer evaluation of product specifications, and market entry strategies or sales contracts. The study must provide justification for all assumptions, which must include assumptions concerning the Material contracts required to develop and sell the Mineral reserves. 26.13 Indicated Mineral resource Is that part of a Mineral resource for which quantity and grade or quality are estimated on the basis of Adequate geological evidence and sampling. The level of geological certainty associated with an indicated Mineral resource is sufficient to allow a Qualified person to apply Modifying factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Because an indicated Mineral resource has a lower level of confidence than the level of confidence of a Measured Mineral resource, an indicated Mineral resource may only be converted to a Probable Mineral reserve. 26.14 Inferred Mineral resource Is that part of a Mineral resource for which quantity and grade or quality are estimated on the basis of Limited geological evidence and sampling. The level of geological uncertainty associated with an inferred Mineral resource is too high to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation of economic viability. Because an inferred Mineral resource has the lowest level of geological confidence of all Mineral resources, which prevents the application of the Modifying factors in a manner useful for evaluation of economic viability, an inferred Mineral resource may not be considered when assessing the economic viability of a mining project, and may not be converted to a Mineral reserve. 26.15 Initial assessment Is a preliminary technical and economic study of the economic potential of all or parts of mineralisation to support the disclosure of Mineral resources. The initial assessment must be prepared by a Qualified person and must include appropriate assessments of reasonably assumed technical and economic factors, together with any other relevant operational factors, that are necessary to demonstrate at the time of reporting that there are reasonable prospects for economic extraction. An initial assessment is required for disclosure of Mineral resources but cannot be used as the basis for disclosure of Mineral reserves.
P a g e 134 | 137 26.16 Investment and market assumptions When used in the context of Mineral reserve determination, includes all assumptions made about the prices, exchange rates, interest and discount rates, sales volumes, and costs that are necessary to determine the economic viability of the Mineral reserves. The Qualified person must use a price for each commodity that provides a reasonable basis for establishing that the project is Economically viable. 26.17 Limited geological evidence When used in the context of Mineral resource determination, means evidence that is only sufficient to establish that geological and grade or quality continuity are more likely than not. 26.18 Material Has the same meaning as under Part 230.405 or Part 240.12b-2. The term material, when used to qualify a requirement for the furnishing of information as to any subject, limits the information required to those matters to which there is a substantial likelihood that a reasonable investor would attach importance in determining whether to purchase the security registered. 26.19 Material of economic interest When used in the context of Mineral resource determination, includes mineralisation, including dumps and tailings, mineral brines, and other resources extracted on or within the earth's crust. It does not include oil and gas resources resulting from oil and gas producing activities, as defined in Part 210.4-10(a)(16)(i) of this chapter, gases (e.g., helium and carbon dioxide), geothermal fields, and water. 26.20 Measured Mineral resource Is that part of a Mineral resource for which quantity and grade or quality are estimated on the basis of Conclusive geological evidence and sampling. The level of geological certainty associated with a measured Mineral resource is sufficient to allow a Qualified person to apply Modifying factors, as defined in this section, in sufficient detail to support detailed mine planning and final evaluation of the economic viability of the deposit. Because a measured Mineral resource has a higher level of confidence than the level of confidence of either an Indicated Mineral resource or an Inferred Mineral resource, a measured Mineral resource may be converted to a Proven Mineral reserve or to a Probable Mineral reserve. 26.21 Mineral reserve Is an estimate of tonnage and grade or quality of Indicated Mineral resources and Measured Mineral resources that, in the opinion of the Qualified person, can be the basis of an Economically viable project. More specifically, it is the economically mineable part of a measured or Indicated Mineral resource, which includes diluting materials and allowances for losses that may occur when the material is mined or extracted. 26.22 Mineral resource Is a concentration or occurrence of Material of economic interest in or on the Earth's crust in such form, grade or quality, and quantity that there are reasonable prospects for economic extraction. A Mineral resource is a reasonable estimate of mineralisation, taking into account relevant factors such as Cutoff grade, likely mining dimensions, location or continuity, that, with the assumed and justifiable technical and economic conditions, is likely to, in whole or in part, become economically extractable. It is not merely an inventory of all mineralisation drilled or sampled. 26.23 Modifying factors Are the factors that a Qualified person must apply to Indicated Mineral resources and Measured Mineral resources and then evaluate in order to establish the economic viability of Mineral reserves. A Qualified person must apply and
P a g e 135 | 137 evaluate modifying factors to convert Measured Mineral resources and Indicated Mineral resources to Proven Mineral reserves and Probable Mineral reserves. These factors include, but are not restricted to: Mining; processing; metallurgical; infrastructure; economic; marketing; legal; environmental compliance; plans, negotiations, or agreements with local individuals or groups; and governmental factors. The number, type and specific characteristics of the modifying factors applied will necessarily be a function of and depend upon the mineral, mine, property, or project. 26.24 Preliminary feasibility study (or pre-feasibility study) Is a comprehensive study of a range of options for the technical and economic viability of a mineral project that has advanced to a stage where a Qualified person has determined (in the case of underground mining) a preferred mining method, or (in the case of surface mining) a pit configuration, and in all cases has determined an effective method of mineral processing and an effective plan to sell the product. 1. A pre-feasibility study includes a financial analysis based on reasonable assumptions, based on appropriate testing, about the Modifying factors and the evaluation of any other relevant factors that are sufficient for a Qualified person to determine if all or part of the Indicated Mineral resources and Measured Mineral resources may be converted to Mineral reserves at the time of reporting. The financial analysis must have the level of detail necessary to demonstrate, at the time of reporting, that extraction is Economically viable. 2. A pre-feasibility study is less comprehensive and results in a lower confidence level than a Feasibility study. A pre-feasibility study is more comprehensive and results in a higher confidence level than an Initial assessment. 26.25 Preliminary market study Is a study that is sufficiently rigorous and comprehensive to determine and support the existence of a readily accessible market for the mineral. It must, at a minimum, include product specifications based on preliminary geologic and metallurgical testing, supply and demand forecasts, historical prices for the preceding five or more years, estimated long term prices, evaluation of competitors (including products and estimates of production volumes, sales, and prices), customer evaluation of product specifications, and market entry strategies. The study must provide justification for all assumptions. It can, however, be less rigorous and comprehensive than a Final market study, which is required for a full Feasibility study. 26.26 Probable Mineral reserve Is the economically mineable part of an Indicated Mineral resource and, in some cases, a Measured Mineral resource. 26.27 Production stage issuer Is an issuer that is engaged in material extraction of Mineral reserves on at least one Material property. 26.28 Production stage property Is a property with material extraction of Mineral reserves. 26.29 Proven Mineral reserve Is the economically mineable part of a Measured Mineral resource and can only result from conversion of a Measured Mineral resource. 26.30 Qualified person Is an individual who is:
P a g e 136 | 137 1. A mineral industry professional with at least five years of Relevant experience in the type of mineralisation and type of deposit under consideration and in the specific type of activity that person is undertaking on behalf of the Registrant; and 2. An eligible member or licensee in good standing of a recognised professional organisation at the time the technical report is prepared. For an organisation to be a recognised professional organisation, it must: i Be either: A. An organisation recognised within the mining industry as a reputable professional association; or B. A board authorised by U.S. federal, state or foreign statute to regulate professionals in the mining, geoscience or related field; ii Admit eligible members primarily on the basis of their academic qualifications and experience; iii Establish and require compliance with professional standards of competence and ethics; iv Require or encourage continuing professional development; v Have and apply disciplinary powers, including the power to suspend or expel a member regardless of where the member practices or resides; and vi Provide a public list of members in good standing. 26.31 Relevant experience Means, for purposes of determining whether a party is a Qualified person, that the party has experience in the specific type of activity that the person is undertaking on behalf of the Registrant. If the Qualified person is preparing or supervising the preparation of a technical report concerning Exploration results, the relevant experience must be in exploration. If the Qualified person is estimating, or supervising the estimation of Mineral resources, the relevant experience must be in the estimation, assessment and evaluation of Mineral resources and associated technical and economic factors likely to influence the prospect of economic extraction. If the Qualified person is estimating, or supervising the estimation of Mineral reserves, the relevant experience must be in engineering and other disciplines required for the estimation, assessment, evaluation and economic extraction of Mineral reserves. 1. Relevant experience also means, for purposes of determining whether a party is a Qualified person, that the party has experience evaluating the specific type of mineral deposit under consideration (e.g., coal, metal, base metal, industrial mineral, or mineral brine). The type of experience necessary to qualify as relevant is a facts and circumstances determination. For example, experience in a high-nugget, vein-type mineralisation such as tin or tungsten would likely be relevant experience for estimating Mineral resources for vein-gold mineralisation, whereas experience in a low grade disseminated gold deposit likely would not be relevant. Note 1 to paragraph (1) of the definition of relevant experience: It is not always necessary for a person to have five years' experience in each and every type of deposit in order to be an eligible Qualified person if that person has relevant experience in similar deposit types. For example, a person with 20 years' experience in estimating Mineral resources for a variety of metalliferous hard-rock deposit types may not require as much as five years of specific experience in porphyry-copper deposits to act as a Qualified person. Relevant experience in the other deposit types could count towards the experience in relation to porphyry-copper deposits. 2. For a Qualified person providing a technical report for Exploration results or Mineral resource estimates, relevant experience also requires, in addition to experience in the type of mineralisation, sufficient experience with the sampling and analytical techniques, as well as extraction and processing techniques, relevant to the mineral deposit under consideration. Sufficient experience means that level of experience necessary to be able to identify, with substantial confidence, problems that could affect the reliability of data and issues associated with processing. 3. For a Qualified person applying the Modifying factors, as defined by this section, to convert Mineral resources to Mineral reserves, relevant experience also requires:
P a g e 137 | 137 i Sufficient knowledge and experience in the application of these factors to the mineral deposit under consideration; and ii Experience with the geology, geostatistics, mining, extraction and processing that is applicable to the type of mineral and mining under consideration.
Date and Signature Page Qualified Person Signature Date Dr Julian Verbeek /s/ Dr. Julian Verbeek 27 March 2022 Richard Butcher /s/ Richard Butcher 28 March 2022 Dr Winfred Assibey-Bonsu /s/ Dr Winfred Assibey-Bonsu 27 March 2022 Andrew Engelbrecht /s/ Andrew Engelbrecht 28 March 2022 Peter Andrews /s/ Peter Andrews 27 March 2022 Daniel Hillier /s/ Daniel Hillier 28 March 2022 Johan Boshoff /s/ Johan Boshoff 28 March 2022 Andre Badenhorst /s/ Andre Badenhorst 27 March 2022 Fiona Phillips /s/ Fiona Phillips 29 March 2022 Trent Strickland /s/ Trent Strickland 29 March 2022 Michael Fitzgerald /s/ Michael Fitzgerald 29 March 2022 Mark Ritchie /s/ Mark Ritchie 28 March 2022 Hamish Guthrie /s/ Hamish Guthrie 29 March 2022
Exhibit 96.5 Goldfields.com Technical Report Summary of Mineral reserves and Mineral resources 31 December 2021 for Gold Fields Limited – Agnew Gold Mine – Australia
Table of Contents 1 Executive Summary ............................................................................................................................................................. 8 1.1 Property description and ownership ............................................................................................................................ 8 1.2 Geology and mineralisation ........................................................................................................................................ 9 1.3 Exploration, development and operations ................................................................................................................... 9 1.4 Mineral resource estimates ........................................................................................................................................ 10 1.5 Mineral reserve estimates .......................................................................................................................................... 12 1.6 Capital and operating cost estimates ......................................................................................................................... 13 1.7 Permitting .................................................................................................................................................................. 13 1.8 Conclusions and recommendations ........................................................................................................................... 14 2 Introduction......................................................................................................................................................................... 15 2.1 Registrant for whom the technical report summary was prepared............................................................................. 15 2.2 Terms of reference and purpose of the technical report summary ............................................................................. 15 2.3 Sources of information .............................................................................................................................................. 15 2.4 Qualified persons and details of inspection ............................................................................................................... 16 2.5 Report version update ............................................................................................................................................... 16 3 Property description ........................................................................................................................................................... 17 3.1 Property location ....................................................................................................................................................... 17 3.2 Ownership ................................................................................................................................................................. 17 3.3 Property area ............................................................................................................................................................. 18 3.4 Property mineral titles, claims, mineral rights, leases and options ............................................................................ 18 3.5 Mineral rights description ......................................................................................................................................... 21 3.6 Encumbrances ........................................................................................................................................................... 22 3.7 Other significant factors and risks ............................................................................................................................. 22 3.8 Royalties or similar interest....................................................................................................................................... 23 4 Accessibility, climate, local resources, infrastructure and physiography .................................................................... 24 4.1 Topography, elevation, and vegetation ..................................................................................................................... 24 4.1.1 Lawlers Project Area ......................................................................................................................................... 24 4.2 Access ....................................................................................................................................................................... 25 4.3 Climate ...................................................................................................................................................................... 25 4.4 Infrastructure ............................................................................................................................................................. 25 4.5 Book Value ............................................................................................................................................................... 26 5 History, previous owners and operators .......................................................................................................................... 27 6 Geological setting, mineralisation, and deposit ............................................................................................................... 29 6.1 Geological setting ..................................................................................................................................................... 29 6.2 Mineralisation ........................................................................................................................................................... 32 7 Exploration .......................................................................................................................................................................... 35 7.1 Exploration ................................................................................................................................................................ 35 7.1.1 Geological Setting ............................................................................................................................................. 36 7.1.2 Exploration Programme .................................................................................................................................... 36 7.2 Drilling ...................................................................................................................................................................... 37 7.2.1 Type and extent ................................................................................................................................................. 37 7.3 Hydrogeology ........................................................................................................................................................... 43 7.4 Geotechnical ............................................................................................................................................................. 44 7.5 Density ...................................................................................................................................................................... 45 8 Sample preparation, analyses, and security .................................................................................................................... 48
P a g e 3 | 138 8.1 Sample preparation ................................................................................................................................................... 48 8.2 Sample analysis ......................................................................................................................................................... 49 8.2.1 PhotonAssay ..................................................................................................................................................... 49 8.2.2 Fire-assay .......................................................................................................................................................... 50 8.3 Quality control and quality assurance (QA/QC) ....................................................................................................... 52 9 Data verification ................................................................................................................................................................. 54 9.1 Data management ...................................................................................................................................................... 54 9.2 Plant Sampling .......................................................................................................................................................... 55 9.3 Drilling ...................................................................................................................................................................... 55 9.4 Sampling ................................................................................................................................................................... 56 9.5 Survey ....................................................................................................................................................................... 56 9.6 Sample analysis ......................................................................................................................................................... 56 9.7 Geological modelling ................................................................................................................................................ 56 10 Mineral processing and metallurgical testing ................................................................................................................. 58 10.1 Testing and procedures ............................................................................................................................................. 58 10.2 Relevant results ......................................................................................................................................................... 58 10.2.1 Sample Head Analyses ...................................................................................................................................... 58 10.2.2 Metallurgical recovery ...................................................................................................................................... 63 10.2.3 Ore hardness ...................................................................................................................................................... 65 10.3 Plant Sampling .......................................................................................................................................................... 65 10.4 Deleterious Elements ................................................................................................................................................ 66 10.5 Metallurgical Risks ................................................................................................................................................... 66 10.5.1 Sample Representativity .................................................................................................................................... 66 10.5.2 Laboratory Test Methods and Scale-up ............................................................................................................. 66 10.5.3 Deleterious Elements ........................................................................................................................................ 67 11 Mineral resource estimates ................................................................................................................................................ 68 11.1 Mineral resources estimation criteria ........................................................................................................................ 68 11.1.1 Geological model and interpretation ................................................................................................................. 68 11.1.2 Block modelling ................................................................................................................................................ 68 11.1.3 Bulk density ...................................................................................................................................................... 70 11.1.4 Compositing and domaining ............................................................................................................................. 70 11.1.5 Top cuts ............................................................................................................................................................. 70 11.1.6 Variography ...................................................................................................................................................... 70 11.1.7 Grade estimation ............................................................................................................................................... 72 11.1.8 Selective mining units ....................................................................................................................................... 73 11.1.9 Model validation ............................................................................................................................................... 74 11.1.10 Cut-off grades ................................................................................................................................................... 74 11.1.11 Classification criteria ........................................................................................................................................ 77 11.2 Mineral resources as of 31 December 2021 .............................................................................................................. 80 11.3 Audits and reviews .................................................................................................................................................... 81 11.4 Comparison with 31 December 2020 Mineral resource ............................................................................................ 81 12 Mineral reserve estimates .................................................................................................................................................. 82 12.1 Level of assessment .................................................................................................................................................. 82 12.2 Mineral reserve estimation criteria ............................................................................................................................ 83 12.2.1 Recent mine performance .................................................................................................................................. 83 12.2.2 Key assumptions and parameters ...................................................................................................................... 84 12.2.3 Cut-off grades ................................................................................................................................................... 86 12.2.4 Mine design ....................................................................................................................................................... 87
P a g e 4 | 138 12.2.5 Mine planning and schedule .............................................................................................................................. 88 12.2.6 Processing schedule .......................................................................................................................................... 91 12.2.7 Classification criteria ........................................................................................................................................ 91 12.2.8 Economic assessment ........................................................................................................................................ 91 12.3 Mineral reserves as of 31 December 2021 ................................................................................................................ 92 12.4 Audits and reviews .................................................................................................................................................... 93 12.5 Comparison with 31 December 2020 Mineral reserve .............................................................................................. 93 13 Mining methods .................................................................................................................................................................. 95 13.1 Open pit ..................................................................................................................................................................... 95 13.2 Underground ............................................................................................................................................................. 95 13.2.1 Waroonga .......................................................................................................................................................... 96 13.2.2 New Holland ..................................................................................................................................................... 98 13.2.3 Redeemer .......................................................................................................................................................... 98 13.2.4 Geotechnical and hydrogeological parameters ................................................................................................ 100 14 Processing and recovery methods ................................................................................................................................... 102 14.1 Flow sheet and design ............................................................................................................................................. 102 14.2 Recent process plant performance ........................................................................................................................... 103 14.3 Process plant requirements ...................................................................................................................................... 103 14.4 Processing Risks ..................................................................................................................................................... 103 14.4.1 Major Equipment Failure ................................................................................................................................ 103 14.4.2 Plant Operational Management ....................................................................................................................... 104 14.4.3 Operating Costs, Plant Consumables and Reagents ........................................................................................ 104 15 Infrastructure .................................................................................................................................................................... 106 15.1 Tailings storage facilities (TSF) .............................................................................................................................. 106 15.2 Waste rock dumps ................................................................................................................................................... 107 15.3 Water ....................................................................................................................................................................... 107 15.4 Power ...................................................................................................................................................................... 108 15.5 Accommodation ...................................................................................................................................................... 108 15.6 Site access ............................................................................................................................................................... 108 15.7 Other infrastructure ................................................................................................................................................. 108 16 Market studies ................................................................................................................................................................... 109 16.1 Preliminary market study ........................................................................................................................................ 109 16.2 Metal Price history .................................................................................................................................................. 111 17 Environmental studies, permitting, and plans, negotiations, or agreements with local individuals or groups .... 112 17.1 Permitting ................................................................................................................................................................ 112 17.2 Environmental studies ............................................................................................................................................. 113 17.3 Waste disposal, monitoring and water management ............................................................................................... 114 17.3.1 Tailings storage facilities (TSF) ...................................................................................................................... 114 17.3.2 Waste rock dumps ........................................................................................................................................... 115 17.3.3 Water management.......................................................................................................................................... 115 17.4 Social and community ............................................................................................................................................. 116 17.5 Mine closure............................................................................................................................................................ 117 18 Capital and operating costs ............................................................................................................................................. 118 18.1 Capital costs ............................................................................................................................................................ 118 18.2 Operating costs ........................................................................................................................................................ 118 19 Economic analysis ............................................................................................................................................................. 120 19.1 Key inputs and assumptions .................................................................................................................................... 120
P a g e 5 | 138 19.2 Economic analysis ................................................................................................................................................... 121 19.3 Sensitivity analysis .................................................................................................................................................. 121 20 Adjacent properties .......................................................................................................................................................... 123 21 Other relevant data and information ............................................................................................................................. 124 22 Interpretation and conclusions ....................................................................................................................................... 126 23 Recommendations ............................................................................................................................................................ 129 24 References .......................................................................................................................................................................... 130 25 Reliance on information provided by the registrant .................................................................................................... 131 26 Definitions .......................................................................................................................................................................... 132 26.1 Adequate geological evidence ................................................................................................................................. 132 26.2 Conclusive geological evidence .............................................................................................................................. 132 26.3 Cutoff grade ............................................................................................................................................................ 132 26.4 Development stage issuer ........................................................................................................................................ 132 26.5 Development stage property.................................................................................................................................... 132 26.6 Economically viable ................................................................................................................................................ 132 26.7 Exploration results .................................................................................................................................................. 132 26.8 Exploration stage issuer .......................................................................................................................................... 132 26.9 Exploration stage property ...................................................................................................................................... 132 26.10 Exploration target .................................................................................................................................................... 132 26.11 Feasibility study ...................................................................................................................................................... 133 26.12 Final market study ................................................................................................................................................... 133 26.13 Indicated Mineral resource ...................................................................................................................................... 133 26.14 Inferred Mineral resource ........................................................................................................................................ 133 26.15 Initial assessment .................................................................................................................................................... 133 26.16 Investment and market assumptions ........................................................................................................................ 133 26.17 Limited geological evidence ................................................................................................................................... 134 26.18 Material ................................................................................................................................................................... 134 26.19 Material of economic interest .................................................................................................................................. 134 26.20 Measured Mineral resource ..................................................................................................................................... 134 26.21 Mineral reserve ....................................................................................................................................................... 134 26.22 Mineral resource ..................................................................................................................................................... 134 26.23 Modifying factors .................................................................................................................................................... 134 26.24 Preliminary feasibility study (or pre-feasibility study) ............................................................................................ 135 26.25 Preliminary market study ........................................................................................................................................ 135 26.26 Probable Mineral reserve ........................................................................................................................................ 135 26.27 Production stage issuer ............................................................................................................................................ 135 26.28 Production stage property ....................................................................................................................................... 135 26.29 Proven Mineral reserve ........................................................................................................................................... 135 26.30 Qualified person ...................................................................................................................................................... 135 26.31 Relevant experience ................................................................................................................................................ 136
P a g e 6 | 138 List of Tables Table 1.4.1: Agnew - summary of gold Mineral resources as at 31 December 2021 (fiscal year end) based on a gold price of $1,500/oz ........11 Table 1.5.1: Agnew - summary of gold Mineral reserves at 31 December 2021 (fiscal year end) based on a gold price of $1,300/oz ...............12 Table 1.6.1: Capital costs ($ million) ......................................................................................................................................................................13 Table 1.6.2: Operating costs ($ million) ..................................................................................................................................................................13 Table 2.4.1: List of Qualified persons .....................................................................................................................................................................16 Table 3.4.1: List of Agnew tenements .....................................................................................................................................................................19 Table 4.1.1: Vegetation types within the Agnew project area ................................................................................................................................24 Table 6.2.1: Summary of deposit dimensions, geological setting and mineralisation style ...................................................................................32 Table 7.4.1: Representative samples for laboratory testing ....................................................................................................................................44 Table 7.5.1: Key Resource models, lithology and bulk density values ..................................................................................................................45 Table 8.2.1: Analytical laboratory accreditation Analytical laboratory accreditation ............................................................................................49 Table 8.3.1: Quality control sample types ...............................................................................................................................................................52 Table 10.2.1: Summary of Waroonga underground mine areas average sample head analyses ............................................................................59 Table 10.2.2: Summary of Agnew underground mine areas average sample head analyses .................................................................................61 Table 10.2.3: Summary of Agnew open pit mine areas: average sample head analyses .......................................................................................63 Table 10.2.4: Summary of metallurgical test quantities and recovery results for key mineralisation areas ..........................................................63 Table 10.2.5: Summary of the 2021 plant gold recovery estimation models for Agnew .......................................................................................64 Table 10.2.6: Summary of rock hardness indices and mill power requirement estimates for Agnew ...................................................................65 Table 11.1.1: Summary of mineral inventory models .............................................................................................................................................69 Table 11.1.2: Summary of variogram parameters ...................................................................................................................................................71 Table 11.1.3: Summary of Mineral resource estimation parameters ......................................................................................................................72 Table 11.1.4: Agnew open pit resource cut-off grades ...........................................................................................................................................74 Table 11.1.5: Agnew underground resource cut-off grades ....................................................................................................................................75 Table 11.1.6: Agnew resource classification criteria by area .................................................................................................................................77 Table 11.2.1: Agnew - summary of gold Mineral resources at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,500/oz ..................................................................................................................................................................................80 Table 12.2.1: Agnew – recent operating statistics ...................................................................................................................................................83 Table 12.2.2: Agnew – Summary of material modifying factors ...........................................................................................................................84 Table 12.2.3: Agnew Unit cost ................................................................................................................................................................................85 Table 12.2.4: Agnew open pit reserve cut-off grades .............................................................................................................................................87 Table 12.2.5: Agnew underground reserve cut-off grades ......................................................................................................................................87 Table 12.2.6: Agnew - Open pit and underground and mining equipment ............................................................................................................90 Table 12.3.1: Agnew - summary of gold Mineral reserves at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,300/oz ......................................................................................................................................................................................92 Table 12.5.1: Net difference in Mineral reserves between 31 December 2020 and 31 December 2021 ...............................................................93 Table 14.3.1: Agnew process plant – key requirements summary ...................................................................................................................... 103 Table 16.1.1: Reserve and Resource metal prices ................................................................................................................................................ 109 Table 17.1.1: Select list of Agnew permits .......................................................................................................................................................... 112 Table 17.2.1: Government Departments which cover monitoring and measurement against potential environmental impacts ....................... 114 Table 18.1.1: Capital costs ($ million) ................................................................................................................................................................. 118 Table 18.2.1: Operating costs ($ million) ............................................................................................................................................................. 118 Table 18.2.2: Post LoM costs ............................................................................................................................................................................... 119 Table 19.1.1: LoM physical, operating cost and capital cost inputs and revenue assumptions 100 % basis ...................................................... 120 Table 19.1.2: LoM cost and revenue assumptions – Breakdown of ESG ........................................................................................................... 121 Table 19.3.1: NPV sensitivity to changes in gold price ....................................................................................................................................... 121
P a g e 7 | 138 Table 19.3.2: NPV sensitivity to changes in grade .............................................................................................................................................. 121 Table 19.3.3: NPV sensitivity to changes in capital costs.................................................................................................................................... 121 Table 19.3.4: NPV sensitivity to changes in operating costs ............................................................................................................................... 121 Table 19.3.5: NPV sensitivity to changes in discount rate ................................................................................................................................... 122 List of Figures Figure 1.1.1: Location of Agnew in Western Australia ............................................................................................................................................8 Figure 3.1.1: Agnew operating sites and infrastructure ..........................................................................................................................................17 Figure 3.4.1: Agnew mineral titles ..........................................................................................................................................................................18 Figure 6.1.1: Generalized geology of Agnew .........................................................................................................................................................30 Figure 6.1.2: Stratigraphic column of Lawlers anticline in Western Australia ......................................................................................................31 Figure 7.1.1: Agnew Gold Mine location ................................................................................................................................................................36 Figure 7.2.1: Schematic long-section through Waroonga complex ........................................................................................................................41 Figure 7.2.2: Schematic long-section through New Holland complex ...................................................................................................................42 Figure 7.2.3: Schematic long-section through Redeemer complex ........................................................................................................................43 Figure 8.2.1: Sample flowchart for MinAnalytical .................................................................................................................................................50 Figure 8.2.2: Sample flowchart for ALS .................................................................................................................................................................51 Figure 13.2.1: N-S Section of Agnew Mine’s Waroonga complex ........................................................................................................................96 Figure 13.2.2: N-S section of Agnew Mine’s New Holland complex ....................................................................................................................98 Figure 13.2.3: N-S section of Agnew Mine’s Redeemer complex .........................................................................................................................99 Figure 14.1.1: Schematic flow diagram of Agnew process plant ........................................................................................................................ 102 Figure 15.1.1: tailings storage facilities locations ................................................................................................................................................ 107
Governance – Technical Report Summary – Template – Australia P a g e 8 | 138 Gold Fields Limited 1 Executive Summary This technical report summary was prepared for Gold Fields Limited (Gold Fields or the Company or the Registrant), a production stage issuer. The purpose of this technical report summary for the Agnew Gold Mine (Agnew) is to highlight significant information in the report focusing on property ownership, exploration strategy and results, Mineral resources and Mineral reserves and key capital and operating cost estimates. Agnew is a production stage property located in Western Australia and this technical report summary has been compiled in accordance with the Securities and Exchange Commission (SEC) property disclosure requirements for mining registrants as specified in Subpart 229.1300 of Regulation S-K - Disclosure by Registrants Engaged in Mining Operations. The effective date of this technical report summary is 31 December 2021. Unless otherwise specified, all units of currency are in United States dollars (US$). All measurements are metric with the exception of troy ounces (oz). 1.1 Property description and ownership Agnew is located approximately 870 kilometres (km) by road northeast of Perth, the capital of Western Australia (Figure 1.1.1). Figure 1.1.1: Location of Agnew in Western Australia Source: Agnew CPR, 2021
P a g e 9 | 138 Gold Fields has owned and operated Agnew since 2001 when Agnew Gold Mining Company Proprietary Limited (AGMC), ACN 098-385-883, was incorporated in Australia as the legal entity holding and conducting mining activity on the Agnew mineral leases. Gold Fields has 100 % ownership of 101 granted Mining Leases and 12 granted Exploration Licences covering an area of 78 613, and 21 Miscellaneous Licences covering 744 ha. The major components of the Agnew mining and processing operation are: The operating Waroonga and New Holland underground mines accessed by declines. A 1.3 Mt per annum capacity crushing, milling and carbon-in-pulp (CIP) process plant. Tailings storage facilities (TSF). A hybrid renewable power plant. Administration centers. Engineering workshops. A residential camp. 1.2 Geology and mineralisation Agnew is located in the northern portion of the north-northwest trending Archean Norseman-Wiluna Greenstone Belt, which forms part of the Yilgarn Craton of southern Western Australia. The stratigraphic succession in the Property comprises tholeiitic basalts, high-Mg basalts, ultramafic flows and layered mafic intrusions unconformably overlain by clastic-dominated metasediments which are folded about the north- plunging Mt White syncline in the north of the Property and the north-plunging Lawlers anticline in the south of the Property. The most substantial gold deposits and the focus of most previous exploration and mining activity at Agnew are located along the western limb of the Lawlers anticline (Waroonga, Redeemer and New Holland complexes) spatially related to the north-northwest trending Waroonga and EMU shears. Most of the western limb gold deposits are broadly related to intersections between structures and mafic-ultramafic stratigraphy with biotite-garnet alteration assemblages dominating to the south and quartz veining to the north. The hydrothermal gold deposits occur in several different styles of lodes and are typically discontinuous with short range predictability. The New Holland complex is associated with quartz veining within sedimentary rocks between the Waroonga and EMU shears. 1.3 Exploration, development and operations Agnew is a well-established mining operation and exploration activities are focused on discovery and resource development aimed at replacing production depletion and growth in Mineral reserves to maintain operational flexibility and sustainability. Agnew’s exploration and development strategy focuses on the extension of existing orebodies and the discovery and delineation of new orebodies both at existing sites and at undeveloped sites across the property. Once a potential orebody has been discovered, exploration is extended and intensified in conjunction with comprehensive infill drilling, in order to enable clearer definition of the orebody and its technical and economic characteristics to profile the potential portions to be mined. Geological, geochemical, geophysical, geostatistical, geotechnical and geometallurgical techniques are constantly refined to improve effectiveness and the economic viability of prospecting and mining activities. A multi-year budget is established to ensure traction on exploration strategies to secure strong exploration project pipelines with the capacity to deliver new Mineral reserves and mining fronts that extend the life of mine. The Greater Agnew Project (GAP) project, staged over the next three to four years, will provide an integrated view of the mine’s full site potential and cost base aimed at extending LoM and sustaining the operation at current metal production levels beyond 2027. If the GAP is not implemented at Agnew over the scheduled project timeline, cost control and the achievement of the AIC/oz metric will be important.
P a g e 10 | 138 Agnew comprises three underground mining areas referred to as Waroonga, New Holland and Redeemer. Waroonga and New Holland have been amalgamated into a single mine with a link drive. Waroonga is predominantly mined using long hole sub level stoping with cemented paste fill. The underground mining is carried out under contract to Barminco, including the supply and maintenance of all underground mobile equipment. The mining methods used at New Holland are long-hole open stoping and inclined room and pillar. All underground mining there is completed by an owner-operator team. The planned Redeemer Zone 2 and Barren Lands underground developments will be mined by long-hole open stoping with pastefill in selected areas. Open pit mining by conventional drill and blast, and truck and shovel operations is also scheduled in the life of mine plan at Barren Lands, Maria South, Hidden Secret/Glasgow Lass and 450 South. The recent production performance of Agnew is summarized in Section 12.2.1. Exploration drilling completed during 2021 was focused on extending the Waroonga, New Holland and Redeemer complexes to extend the life of mine. Infill drilling at Waroonga further defined the significant Kath Lower lode, which remains open down-plunge. Extensional and infill drilling was also completed at the Waroonga North lodes, replacing ore depleted by mining. Down-plunge extensional drilling of the Kim lode continued to return positive results. Step-out and infill drilling is planned for the Waroonga North, Kath Lower, Main South, FBH South and Kim South areas. At New Holland, extensional and exploration drilling was conducted at Hidden Secret, Sheba South and Sheba North lodes. The drilling at Sheba South defined a significant high-grade extension of the Sheba lode. Further drilling is planned at Sheba South, Sheba North and Hidden Secret. Drilling also continued to grow the Redeemer underground complex. At Barren Lands, resource conversion drilling down-plunge of the proposed Barren Lands open pit added to the underground Mineral reserve, which remains open down-plunge. Drilling the Redeemer North lode confirmed the geometry and thickness of the mineralisation, resulting in the reinstatement of Redeemer North as a Mineral resource. Planned exploration includes Mineral resource conversion drilling at Barren Lands, Redeemer North and Redeemer Zone 2 North, and testing of down-plunge extensions. Recent life of mine infrastructure investments to secure a sustainable future include completion of a link drive between the Waroonga and New Holland mines, completion of the solar farm, wind farm and gas electricity facility and upgrades to underground infrastructure and ventilation in existing mines. 1.4 Mineral resource estimates The Agnew Mineral resources exclusive of Mineral reserves as at 31 December 2021 are summarized in Table 1.4.1. The Mineral resources are 100 % attributable to Gold Fields and are net of production depletion up to 31 December 2021. The point of reference for the Mineral resources is in-situ over a minimum mining width with dilution applied. Open pit Mineral resources are confined to pit shells and underground Mineral resources are constrained to a practical mining shape and a minimum mining width.
P a g e 11 | 138 Table 1.4.1: Agnew - summary of gold Mineral resources as at 31 December 2021 (fiscal year end) based on a gold price of $1,500/oz Mineral resources (exclusive of Mineral reserves) Cut-off Grades (g/t Au) Metallurgical Recovery (%) Amount/ (kt) Grades/ (g/t Au) Amount/ (koz Au) Underground Mineral resources UG Measured Mineral resources 107 5.8 20 2.15 to 4.07 94.04 UG Indicated Mineral resources 6,114 5.3 1,043 2.15 to 4.07 94.04 UG Measured + Indicated Mineral resources 6,221 5.3 1,063 2.15 to 4.07 94.04 UG Inferred Mineral resources 6,888 4.6 1,027 2.15 to 4.07 Open pit Mineral resources OP Measured Mineral resources OP Indicated Mineral resources 1,980 2.7 173 0.76 to 0.93 94.99 OP Measured + Indicated Mineral resources 1,980 2.7 173 0.76 to 0.93 94.99 OP Inferred Mineral resources 751 3.5 86 0.76 to 0.93 93.44 Stockpile Mineral resources SP Measured Mineral resources SP Indicated Mineral resources SP Measured + Indicated Mineral resources SP Inferred Mineral resources Total Agnew Mineral resources Total Measured Mineral resources 107 5.8 20 Total Indicated Mineral resources 8,093 4.7 1,216 Total Measured + Indicated Mineral resources 8,200 4.7 1,236 Total Inferred Mineral resources 7,639 4.5 1,112 Notes: a) Rounding of figures may result in minor computational discrepancies. b) Mineral resources are exclusive of Mineral reserves. c) No year-on-year Mineral resource comparison is presented as Agnew did not disclose a Mineral resource in 2020. d) Quoted as diluted in situ metric tonnes and grades. Metallurgical recovery factors have not been applied to the Mineral resource estimates. The approximate metallurgical recovery factor is 93.4 %. The metallurgical recovery is the ratio, expressed as a percentage, of the mass of the specific mineral product recovered from ore treated at the process plant to its total specific mineral content before treatment. Agnew mining operations vary according to the mix of the source material (e.g., oxide, transitional, fresh and ore type blend). e) The metal prices used for the 2021 Mineral resources are based on a gold price of $1,500 per ounce or A$2,000 per ounce (at an exchange rate of A$1: $0.75). Open pit Mineral resources at the Australian operations are based on revenue factor 1 pits and the underground Mineral resources on appropriate mine design and extraction schedules. The gold price used for Mineral resources approximates 15 % higher than the selected Mineral reserve. f) The cut-off grade may vary per shaft, open pit or underground mine, depending on the respective costs, depletion schedule, ore type, expected mining dilution and expected mining recovery. The average or range of cut-off grade values applied to the Mineral resources are: Agnew 2.15 g/t to 4.07 g/t Au mill feed (underground) and 0.76 g/t to 0.93 g/t Au mill feed (open pit). g) The Mineral resources are based on initial assessments at the resource gold price of $1,500/oz and consider estimates of all Agnew costs, the impact of modifying factors such as mining dilution and mining recovery, processing recovery and royalties. Mineral resources are also tested through the application of Environmental, Social and Governance (ESG) criteria to demonstrate reasonable prospects for economic extraction. h) The Mineral resources are estimated at a point in time and can be affected by changes in the gold price, US Dollar currency exchange rates, permitting, legislation, costs and operating parameters. Source: Agnew CPR 2021
P a g e 12 | 138 1.5 Mineral reserve estimates The Agnew Mineral reserves as at 31 December 2021 are summarized in Table 1.5.1. The Mineral reserves are 100 % attributable to Gold Fields and are net of production depletion up to 31 December 2021. The point of reference for the Mineral reserves is ore delivered to the processing facility. Table 1.5.1: Agnew - summary of gold Mineral reserves at 31 December 2021 (fiscal year end) based on a gold price of $1,300/oz Amount/ (kt) Grades/ (g/t Au) Amount/ (koz Au) Cut-off Grades (g/t Au) Metallurgical Recovery (%) Underground Mineral reserves UG Proven Mineral reserves 6 5.5 1 2.6 to 4.6 94.04 UG Probable Mineral reserves 4,712 6.4 966 2.6 to 4.6 94.04 UG total Mineral reserves 4,718 6.4 967 2.6 to 4.6 94.04 Open Pit Mineral reserves OP Proven Mineral reserves - - OP Probable Mineral reserves 408 3.3 43 0.85 to 0.88 94.99 OP total Mineral reserves 408 3.3 43 0.85 to 0.88 94.99 Stockpile Mineral reserves SP Proven Mineral reserves 13 8.0 3 0.9 to 0.99 93.44 SP Probable Mineral reserves SP total Mineral reserves 13 8.0 3 0.9 to 0.99 93.44 Total Mineral reserves Total Proven Mineral reserves 19 7.2 4 Total Probable Mineral reserves 5,120 6.1 1,009 Total Agnew Mineral reserves 2021 5,138 6.1 1,013 Total Agnew Mineral reserves 2020 5,292 5.4 917 year-on-year difference (%) -3% 14% 11% Notes: a) Rounding of figures may result in minor computational discrepancies. b) Refer to Table 12.5.1 for year-on-year Mineral reserve comparison. c) Quoted as mill delivered metric tonnes and run-of-mine grades, inclusive of all mining dilutions and gold losses except metallurgical recovery. Metallurgical recovery factors have not been applied to the reserve figures. The approximate metallurgical recovery factor is 94.04 % for underground. The metallurgical recovery is the ratio, expressed as a percentage, of the mass of the specific mineral product recovered from ore treated at the process plant to its total specific mineral content before treatment. The recoveries for Agnew vary according to the mix of the ore source material (e.g., oxide, transitional, fresh and ore type blend) and method of treatment. d) The metal prices used for the 2021 LoM Mineral reserves are based on a gold price of $1,300 per ounce or A$1,750 per ounce (at an exchange rate of A$1:$0.74). Open pit Mineral reserves at Agnew are based on optimized pits and the underground operations on appropriate mine design and extraction schedules. The gold price used for Mineral reserves is detailed in particularity in chapter 16 Marketing. e) Dilution relates to planned and unplanned waste and/or low-grade material being mined and delivered to the process plant. Ranges are given for those operations that have multiple orebody styles and mining methodologies. The mine dilution factors range from 11 % to 55 % (open pit) and 13 % to 30 % (underground). f) The mining recovery factor relates to the proportion or percentage of ore mined from the defined orebody at the gold price used for the declaration of Mineral reserves. This percentage will vary from mining area to mining area and reflects planned and scheduled reserves against actual tonnes, grade and metal mined, with all modifying factors, mining constraints and pillar discounts applied. The mining recovery factors range from 70 % to 93 % (underground) and 72 % to 88 % (open pit). g) The cut-off grade may vary per open pit or underground mine, depending on the respective costs, depletion schedule, ore type, expected mining dilution and mining and metallurgical recoveries. The average or range of cut-off grade values applied in the planning process are: Agnew 2.6 g/t to 4.46 g/t Au mill feed (underground) and 0.85 g/t to 1.04 g/t Au (open pit). h) A gold based Mine Call Factor (gold called for over gold accounted for) determined primarily on historic performance but also on realistic planned improvements where appropriate, is applied to the Mineral reserves. A Mine Call Factor of 100 % has been applied at Agnew. i) The Mineral reserves are estimated at a point in time and can be affected by changes in the gold price, US Dollar currency exchange rates, permitting, legislation, costs and operating parameters. j) Agnew is 100 % attributable to Gold Fields and is entitled to mine all declared material located within the properties mineral leases and all necessary statutory mining authorizations and permits are in place or have reasonable expectation of being granted. Source: Agnew CPR, 2021 The Agnew Mineral reserves are the economically mineable part of the measured and indicated Mineral resources based on technical and economic studies completed to a minimum of a pre-feasibility level based on the reserve gold
P a g e 13 | 138 price of $1,300/oz to justify their extraction as at 31 December 2021. The Agnew life of mine reserve has a pre- feasibility study estimated accuracy of ± 25 % with a contingency lower than or equal to 15 %. 1.6 Capital and operating cost estimates Major budgeted capital cost items for the 31 December 2021 Mineral reserve life of mine (LoM) plan include underground works, access developments for extensions, additional drilling including the Sheba South 811 drill drive, Sheba vent upgrade, Kath vent upgrade, Kath access and decline and mining studies. Capital has also been attributed to new project startup costs for Barren Lands Open Pit and Underground and Redeemer Zone 2. Exploration expenditure is also budgeted for the growth and resource/reserve conversion pipeline. The forecast capital costs are summarized in Table 1.6.1. Table 1.6.1: Capital costs ($ million) Capital cost per item Units 2022 2023 2024 2025 2026 2027 Capital $ million 87.5 69.2 62.3 32.3 13.2 1.7 Notes: a) The detailed capital cost schedule is presented in Table 18.1.1 b) This capital summary estimate is for the Mineral reserve life of mine schedule c) Closure costs are included in operating costs Source: Agnew CPR, 2021 Budgeted operating costs for the 31 December 2021 Mineral reserve LoM plan are summarized in Table 1.6.2. Table 1.6.2: Operating costs ($ million) Operating cost per item Units 2022 2023 2024 2025 2026 2027 Operating costs $ million 183.0 163.7 146.7 91.5 67.2 34.3 Notes: a) The detailed operating cost schedule is presented in Table 18.2.1 b) This operating cost summary estimate is for the Mineral reserve life of mine schedule c) Closure costs are presented from 2026 onwards Source: Agnew CPR, 2021 The operating costs covers mining, cartage, processing, onsite and offsite administration. This total excludes rehabilitation and closure costs of $43 million, inclusive of the additional provision for new open pits, power station and equipment leasing costs of $117 million. 1.7 Permitting The key operating environmental permits for the operation are issued by DMIRS and DWER and relate to: Mining Proposal which includes Land Clearing, Disturbance and Infrastructure Environmental Licence Native Vegetation Clearing Mine dewatering (category 06) Water abstraction and groundwater operating strategies Sewerage facility (category 54) Putrescible landfill site; and Mine Closure Plan The operation has these permits in place and manage the obligations through the INX InForm (legal register process).
P a g e 14 | 138 A Mining Proposal has been approved by the Department of Mines, Industry Regulation and Safety for the Barren Lands Open Pit Project. Amendments to the site Environmental Licence which is governed by the Department of Water and Environmental Regulation may be required for dewatering of the open pit during operations or dewatering of the planned Redeemer underground operations. Heritage surveys were conducted across all future expansion areas to support both mine development and exploration targets. At this stage no Section 18 approvals are required under the Aboriginal Heritage Act to support future operations and drilling. A Project Management Plan is currently being developed for submission to the Department of Mines, Industry Regulation and Safety for the Barren Lands Open Pit Project, which is a requirement before mining can commence. There are no significant encumbrances to the property or Agnew’s ability to execute the life of mine plan from a current or future anticipated permitting perspective. 1.8 Conclusions and recommendations The Agnew Mineral reserves currently support a 6-year life of mine reserve plan that values the operation at a net present value of $23.7 million at a discount rate of 3.8 % and the reserve gold price of $1,300/oz. This valuation includes closure liabilities associated with historical and planned mining activities, as well as staff redundancy and power-contract termination liabilities. Gold Fields’ commitment to materiality, transparency and competency in its Mineral resources and Mineral reserves disclosure to regulators and in the public domain is of paramount importance to the Qualified person and the registrants Executive Committee and Board of Directors continue to endorse the company’s internal and external review and audit assurance protocols. This Technical Report Summary should be read in totality to gain a full understanding of Agnew’s Mineral resource and Mineral reserve estimation and reporting process, including data integrity, estimation methodologies, modifying factors, mining and processing capacity and capability, confidence in the estimates, economic analysis, risk and uncertainty and overall projected property value. However, to ensure consolidated coverage of the company’s primary internal controls in generating Mineral resource and reserve estimates a key point summary is provided in Chapter 21 for reference.
P a g e 15 | 138 2 Introduction 2.1 Registrant for whom the technical report summary was prepared The Agnew technical report summary was prepared for Gold Fields Limited (Gold Fields or the Company or the Registrant), a production stage issuer. 2.2 Terms of reference and purpose of the technical report summary The purpose of this technical report summary is to support the disclosure of Mineral resources and Mineral reserves for the Agnew Gold Mine (Agnew or the Property), a production stage property located in Western Australia (Figure 1.1.1), and the report has been prepared in accordance with the Securities and Exchange Commission (SEC) property disclosure requirements for mining registrants as specified in Subpart 229.1300 of Regulation S-K - Disclosure by Registrants Engaged in Mining Operations. The effective date of this technical report summary is 31 December 2021. In addition to this disclosure being in line with the S-K 1300 rule, the Mineral resources and Mineral reserves stated in this technical report summary have also been reported in accordance with the South African Code for the Reporting of Exploration Results, Mineral resources and Mineral reserves (SAMREC Code 2016). SAMREC is aligned to the Committee for Mineral reserves International Reporting Standards (CRIRSCO) Reporting Template November 2019. 2.3 Sources of information This technical report summary is principally based on information disclosed in the “Competent Person’s Report on the Material Assets of Agnew Gold Mine as at 31 December 2021” prepared by Agnew Qualified persons on behalf of the Company and has been reviewed by Regional and Corporate subject matter experts and competent persons. The Competent Person’s Report (CPR) was supplemented by technical reports and economic studies prepared by the Company and third-party specialists engaged by the Company as cited throughout this technical report summary and listed in Section 24. All units of currency are in United States dollars ($). All measurements are metric with the exception of troy ounces (oz).
P a g e 16 | 138 2.4 Qualified persons and details of inspection The Qualified persons responsible for the preparation of this technical report summary are listed in Table 2.4.1. All Qualified persons are eligible members in good standing of the South African Mineral Reporting Codes (SAMREC 2016) recognized professional organization (RPO) register within the mining industry. They have at least five years of relevant experience in the type of mineralisation and type of deposit under consideration and in the specific type of activity that the Qualified person is undertaking on behalf of the Company at the time this technical report summary was prepared. Table 2.4.1: List of Qualified persons Incumbent Employer Position Affiliations Relevant experience (years) Details of inspection Responsibility Dr Julian Verbeek Gold Fields VP Geology and Mineral resources FAusIMM - 207994 34 Has not attended site This document has been prepared under the supervision of and reviewed by Julian Verbeek. Chapters 1-26 Richard Butcher Gold Fields Chief Technical Officer GFL Group Technical Services FAusIMM CP - 211182 41 21 – 22 Feb 2021 Overview and review of document. Chapters 1-5, 10 & 12-26 Dr Winfred Assibey-Bonsu Gold Fields Group Geostatistician and Evaluator FSAIMM - 400112/00 35 Has attended site Resources Estimation Chapters 8 - 9 & 11 Andrew Engelbrecht Gold Fields Group Geologist AusIMM - 224997 22 Has attended site Geology and Resources. Chapters 1 - 11 Peter Andrews Gold Fields VP: Geotechnical FAusIMM CP - 302255 25 Has attended site Geotechnical review. Sections 7.4, 15.2 & 17.3.2 Daniel Hillier Gold Fields VP: Metallurgy FAusIMM CP - 227106 31 20 – 21 Jan 2021 Chapters 10 & 14 Johan Boshoff Gold Fields Group Head of Tailings FAusIMM - 1007564 26 13 Oct 2021 3 Nov 2021 Tailings Review. Sections 15.1 & 17.3.1 Andre Badenhorst Gold Fields Group Technical and Reporting Governance Manager AusIMM - 309882 41 Has attended site Chapters 1-26 Fiona Phillips Gold Fields VP: Technical AusIMM - 112538 24 Twice a year. Overview and review of document. Chapters 1-5, 10 & 12-26 Trent Strickland Gold Fields Principal Geologist: Resources & Reserves AusIMM - 211953 AIG - 6761 17 Twice a year. Geology and Resources. Chapters 1 - 11 Peter Burge Gold Fields Manager: Geology AusIMM - 302309 29 Site employee Chapters 1-26 Neil Morris Gold Fields Superintendent: Mine Planning AusIMM - 208320 18 Quarterly visits. Reserves and Mining Chapters 1-5, 10 & 12-26 Stephanie Gotley Gold Fields Superintendent: Resource Evaluation AusIMM - 211515 AIG - 2780 27 Quarterly visits. Resources Estimation Chapters 8 - 9 & 11 Notes a) The Qualified persons were not all able to attend site in 2021 for Mineral reserve and Mineral resource reviews, however, the Mineral reserve and Mineral resource were reviewed according to the chapter 21 description. Other Qualified persons have visited the site historically. The recognized professional organization affiliation in good standing has been reviewed by Gold Fields. The Qualified persons have been appointed by Gold Fields. 2.5 Report version update This is the maiden technical report summary filed by Gold Fields on the Agnew property in Western Australia.
P a g e 17 | 138 3 Property description 3.1 Property location Agnew is located approximately 870km by road northeast of Perth, the capital of Western Australia (Figure 1.1.1). The Property’s administration office and process plant is located directly west of the former gold mining town of Agnew shown in Figure 3.1.1, latitude 28º00’39”S and longitude 120º30’59”E or GDA94 / MGA Zone 51 coordinates 255,788 E and 6,899,110 N. Figure 3.1.1: Agnew operating sites and infrastructure Source: Agnew CPR, 2021 The nearest population centre is the town of Leinster situated 25km by road to the northeast. The closest major population centre is the city of Kalgoorlie-Boulder (population 29,000), approximately 375km by road to the south. 3.2 Ownership Agnew Gold Mining Company Proprietary Limited, Australian Company Number 098-385-883, was incorporated in Australia in 2001 as the legal entity holding and conducting mining activity on the Agnew property. Gold Fields has
P a g e 18 | 138 owned and operated Agnew since 2001. Gold Fields holds 100 % of the issued shares of Agnew through its 100 % attributable holding in the issued shares of Orogen Holding (BVI) Limited. 3.3 Property area Agnew controls exploration and mining tenements covering a total area of 79,357 ha. Agnew has security of tenure for all current exploration and mining tenements that contribute to future Mineral resources and reserves. 3.4 Property mineral titles, claims, mineral rights, leases and options The Company via its wholly owned subsidiary Agnew has 100 % ownership of 101 granted Mining Leases and 12 granted Exploration Licences covering 78,613 ha, and 21 Miscellaneous Licences covering 744 ha (Figure 3.4.1, Table 3.4.1). Figure 3.4.1: Agnew mineral titles Source: Agnew CPR, 2021
P a g e 19 | 138 Table 3.4.1: List of Agnew tenements Number Grant date Expiry date Area (HA=hectare) (BL=blocks) Min annual expenditure ($) Annual rent ($) Reporting group Term granted Mining Leases M 36/113 03/03/1989 02/03/2031 206.60000 HA 15,318 3,370 Agnew - C136/2004 21 Years (Renewed) M 36/114 03/03/1989 02/03/2031 994.05000 HA 73,630 16,199 Agnew - C136/2004 21 Years (Renewed) M 36/115 03/03/1989 02/03/2031 900.20000 HA 66,674 14,668 Agnew - C136/2004 21 Years (Renewed) M 36/116 03/03/1989 02/03/2031 975.90000 HA 72,224 15,889 Agnew - C136/2004 21 Years (Renewed) M 36/119 03/03/1989 02/03/2031 406.80000 HA 30,118 6,626 Agnew - C136/2004 21 Years (Renewed) M 36/120 03/03/1989 02/03/2031 942.25000 HA 69,782 15,352 Agnew - C136/2004 21 Years (Renewed) M 36/121 03/03/1989 02/03/2031 979.50000 HA 72,520 15,954 Agnew - C136/2004 21 Years (Renewed) M 36/123 10/03/1989 09/03/2031 387.40000 HA 28,712 6,317 Agnew - C136/2004 21 Years (Renewed) M 36/138 14/07/1989 13/07/2031 572.55000 HA 42,402 9,328 Agnew - C136/2004 21 Years (Renewed) M 36/139 14/07/1989 13/07/2031 528.60000 HA 39,146 8,612 Agnew - C136/2004 21 Years (Renewed) M 36/140 14/07/1989 13/07/2031 463.00000 HA 34,262 7,538 Agnew - C136/2004 21 Years (Renewed) M 36/141 14/07/1989 13/07/2031 791.85000 HA 58,608 12,894 Agnew - C136/2004 21 Years (Renewed) M 36/142 14/07/1989 13/07/2031 461.90000 HA 34,188 7,521 Agnew - C136/2004 21 Years (Renewed) M 36/149 13/07/1989 12/07/2031 625.80000 HA 46,324 10,191 Agnew - C136/2004 21 Years (Renewed) M 36/150 03/08/1989 02/08/2031 398.25000 HA 29,526 6,496 Agnew - C136/2004 21 Years (Renewed) M 36/163 08/03/1990 07/03/2032 164.75000 HA 12,210 2,686 Agnew - C136/2004 21 Years (Renewed) M 36/164 07/03/1990 06/03/2032 938.55000 HA 69,486 15,287 Agnew - C136/2004 21 Years (Renewed) M 36/165 07/03/1990 06/03/2032 861.55000 HA 63,788 14,033 Agnew - C136/2004 21 Years (Renewed) M 36/166 11/04/1990 10/04/2032 723.65000 HA 53,576 11,787 Agnew - C136/2004 21 Years (Renewed) M 36/167 11/04/1990 10/04/2032 846.55000 HA 62,678 13,789 Agnew - C136/2004 21 Years (Renewed) M 36/168 11/04/1990 10/04/2032 774.70000 HA 57,350 12,617 Agnew - C136/2004 21 Years (Renewed) M 36/171 14/06/1990 13/06/2032 907.05000 HA 67,192 14,782 Lawlers - C014/2003 21 Years (Renewed) M 36/172 14/06/1990 13/06/2032 799.70000 HA 59,200 13,024 Lawlers - C014/2003 21 Years (Renewed) M 36/174 06/03/1990 05/03/2032 408.65000 HA 30,266 6,659 Lawlers - C014/2003 21 Years (Renewed) M 36/182 26/07/1990 25/07/2032 363.25000 HA 26,936 5,926 Agnew - C136/2004 21 Years (Renewed) M 36/208 12/03/1991 11/03/2033 596.55000 HA 44,178 9,719 Lawlers - C014/2003 21 Years (Renewed) M 36/233 02/04/1992 01/04/2034 118.55000 HA 8,806 1,937 Agnew - C136/2004 21 Years (Renewed) M 36/234 02/04/1992 01/04/2034 701.60000 HA 51,948 11,429 Agnew - C136/2004 21 Years (Renewed) M 36/248 07/12/1992 06/12/2034 33.59000 HA 7,400 554 Agnew - C136/2004 21 Years (Renewed) M 36/27 30/10/1985 29/10/2027 612.55000 HA 45,362 9,980 Agnew - C136/2004 21 Years (Renewed) M 36/273 27/10/1993 26/10/2035 480.60000 HA 35,594 7,831 Lawlers - C014/2003 21 Years (Renewed) M 36/274 27/10/1993 26/10/2035 824.35000 HA 61,050 13,431 Lawlers - C014/2003 21 Years (Renewed) M 36/275 27/10/1993 26/10/2035 600.05000 HA 44,474 9,784 Lawlers - C014/2003 21 Years (Renewed) M 36/276 27/10/1993 26/10/2035 917.80000 HA 67,932 14,945 Lawlers - C014/2003 21 Years (Renewed) M 36/277 27/10/1993 26/10/2035 606.55000 HA 44,918 9,882 Lawlers - C014/2003 21 Years (Renewed) M 36/278 27/10/1993 26/10/2035 726.50000 HA 53,798 11,836 Lawlers - C014/2003 21 Years (Renewed) M 36/28 30/10/1985 29/10/2027 23.69000 HA 7,400 391 Lawlers - C014/2003 21 Years (Renewed) M 36/293 23/02/1994 22/02/2036 27.87500 HA 7,400 456 Lawlers - C014/2003 21 Years (Renewed) M 36/301 23/06/1994 22/06/2036 706.50000 HA 52,318 11,510 Agnew - C136/2004 21 Years (Renewed) M 36/313 18/10/1994 17/10/2036 470.75000 HA 34,854 7,668 Lawlers - C014/2003 21 Years (Renewed) M 36/314 18/10/1994 17/10/2036 722.25000 HA 53,502 11,770 Lawlers - C014/2003 21 Years (Renewed) M 36/315 05/01/1995 04/01/2037 259.25000 HA 19,240 4,233 Agnew - C136/2004 21 Years (Renewed) M 36/316 05/01/1995 04/01/2037 137.90000 HA 10,212 2,247 Agnew - C136/2004 21 Years (Renewed) M 36/317 05/01/1995 04/01/2037 129.85000 HA 9,620 2,116 Agnew - C136/2004 21 Years (Renewed) M 36/32 23/04/1986 22/04/2028 87.76000 HA 7,400 1,433 Agnew - C136/2004 21 Years (Renewed) M 36/352 31/03/2000 30/03/2042 456.70000 HA 33,818 7,440 Agnew - C136/2004 21 Years (Renewed) M 36/353 31/03/2000 30/03/2042 865.60000 HA 64,084 14,098 Agnew - C136/2004 21 Years (Renewed) M 36/366 09/12/2008 08/12/2029 728.25000 HA 53,946 11,868 Lawlers - C014/2003 21 Years M 36/367 13/02/2009 12/02/2030 737.75000 HA 54,612 12,015 Lawlers - C014/2003 21 Years M 36/368 09/12/2008 08/12/2029 121.30000 HA 9,028 1,986 Lawlers - C014/2003 21 Years M 36/369 13/02/2009 12/02/2030 121.40000 HA 9,028 1,986 Lawlers - C014/2003 21 Years M 36/380 09/12/2008 08/12/2029 969.20000 HA 71,780 15,792 Lawlers - C014/2003 21 Years M 36/381 13/02/2009 12/02/2030 949.20000 HA 70,300 15,466 Lawlers - C014/2003 21 Years M 36/382 17/02/2009 16/02/2030 922.90000 HA 68,302 15,026 Lawlers - C014/2003 21 Years M 36/383 17/02/2009 16/02/2030 882.45000 HA 65,342 14,375 Lawlers - C014/2003 21 Years M 36/384 17/02/2009 16/02/2030 971.00000 HA 71,854 15,808 Lawlers - C014/2003 21 Years M 36/391 17/02/2009 16/02/2030 961.30000 HA 71,188 15,661 Lawlers - C014/2003 21 Years M 36/401 25/01/2008 24/01/2029 229.70000 HA 17,020 3,744 Lawlers - C014/2003 21 Years M 36/407 17/02/2009 16/02/2030 7.24450 HA 7,400 130 Lawlers - C014/2003 21 Years M 36/408 13/04/2007 12/04/2028 485.30000 HA 35,964 7,912 Lawlers - C014/2003 21 Years
P a g e 20 | 138 Number Grant date Expiry date Area (HA=hectare) (BL=blocks) Min annual expenditure ($) Annual rent ($) Reporting group Term granted M 36/411 17/02/2009 16/02/2030 752.90000 HA 55,722 12,259 Lawlers - C014/2003 21 Years M 36/413 29/08/2011 28/08/2032 634.25000 HA 46,990 - Agnew - C136/2004 21 Years M 36/417 23/01/2008 22/01/2029 922.55000 HA 68,302 15,026 Agnew - C136/2004 21 Years M 36/442 18/02/2009 17/02/2030 606.90000 HA 44,918 9,882 Lawlers - C014/2003 21 Years M 36/443 25/05/2007 24/05/2028 364.00000 HA 26,936 5,926 Lawlers - C014/2003 21 Years M 36/450 28/08/2000 27/08/2042 304.55000 HA 22,570 - Agnew - C136/2004 21 Years (Renewed) M 36/493 25/05/2007 24/05/2028 121.20000 HA 9,028 1,986 Lawlers - C014/2003 21 Years M 36/495 23/01/2008 22/01/2029 771.50000 HA 57,128 12,568 Lawlers - C014/2003 21 Years M 36/496 09/09/2008 08/09/2029 908.45000 HA 67,266 14,799 Lawlers - C014/2003 21 Years M 36/53 22/09/1988 21/09/2030 854.30000 HA 63,270 13,919 Agnew - C136/2004 21 Years (Renewed) M 36/55 29/10/1987 28/10/2029 927.10000 HA 68,672 15,108 Agnew - C136/2004 21 Years (Renewed) M 36/551 28/05/2008 27/05/2029 24.27000 HA 7,400 407 Lawlers - C014/2003 21 Years M 36/576 23/01/2008 22/01/2029 892.20000 HA 66,082 14,538 Lawlers - C014/2003 21 Years M 36/577 23/01/2008 22/01/2029 808.75000 HA 59,866 13,171 Lawlers - C014/2003 21 Years M 36/578 23/01/2008 22/01/2029 908.10000 HA 67,266 14,799 Lawlers - C014/2003 21 Years M 36/579 09/09/2008 08/09/2029 904.10000 HA 66,970 14,733 Lawlers - C014/2003 21 Years M 36/614 05/12/2002 04/12/2023 9.53300 HA 7,400 163 Lawlers - C014/2003 21 Years M 36/62 22/09/1988 21/09/2030 256.50000 HA 19,018 4,184 Agnew - C136/2004 21 Years (Renewed) M 36/622 13/06/2005 12/06/2026 926.40000 HA 68,598 15,092 Lawlers - C014/2003 21 Years M 36/623 13/06/2005 12/06/2026 725.95000 HA 53,724 11,819 Lawlers - C014/2003 21 Years M 36/624 18/02/2009 17/02/2030 242.75000 HA 17,982 3,956 Lawlers - C014/2003 21 Years M 36/63 22/09/1988 21/09/2030 970.05000 HA 71,854 15,808 Agnew - C136/2004 21 Years (Renewed) M 36/635 18/02/2009 17/02/2030 724.00000 HA 53,576 11,787 Lawlers - C014/2003 21 Years M 36/636 18/02/2009 17/02/2030 439.05000 HA 32,560 7,163 Lawlers - C014/2003 21 Years M 36/637 17/03/2006 16/03/2027 9.72200 HA 7,400 163 Lawlers - C014/2003 21 Years M 36/65 22/09/1988 21/09/2030 686.50000 HA 50,838 11,184 Agnew - C136/2004 21 Years (Renewed) M 36/66 22/09/1988 21/09/2030 331.80000 HA 24,568 5,405 Agnew - C136/2004 21 Years (Renewed) M 36/680 17/09/2010 16/09/2031 1.68150 HA 3,700 33 Agnew - C136/2004 21 Years M 36/69 22/09/1988 21/09/2030 485.45000 HA 35,964 7,912 Agnew - C136/2004 21 Years (Renewed) M 36/694 17/09/2020 16/09/2041 9.70858 HA 7,400 163 Lawlers - C014/2003 21 Years M 36/695 07/08/2020 06/08/2041 99.33887 HA 7,400 1,628 Agnew - C136/2004 21 Years M 36/70 22/09/1988 21/09/2030 773.65000 HA 57,276 12,601 Agnew - C136/2004 21 Years (Renewed) M 36/71 22/09/1988 21/09/2030 975.85000 HA 72,224 15,889 Agnew - C136/2004 21 Years (Renewed) M 36/72 22/09/1988 21/09/2030 901.15000 HA 66,748 14,685 Agnew - C136/2004 21 Years (Renewed) M 36/73 22/09/1988 21/09/2030 999.80000 HA 74,000 16,280 Agnew - C136/2004 21 Years (Renewed) M 36/74 22/09/1988 21/09/2030 814.75000 HA 60,310 13,268 Agnew - C136/2004 21 Years (Renewed) M 36/75 22/09/1988 21/09/2030 999.45000 HA 74,000 16,280 Agnew - C136/2004 21 Years (Renewed) M 36/77 22/09/1988 21/09/2030 475.00000 HA 35,150 7,733 Agnew - C136/2004 21 Years (Renewed) M 36/89 17/06/1988 16/06/2030 899.35000 HA 66,600 14,652 Agnew - C136/2004 21 Years (Renewed) M 36/90 17/06/1988 16/06/2030 986.30000 HA 73,038 16,068 Agnew - C136/2004 21 Years (Renewed) M 36/91 27/07/1988 26/07/2030 227.05000 HA 16,872 3,712 Lawlers - C014/2003 21 Years (Renewed) Exploration Licences E 36/610 14/01/2008 13/01/2022 7 BL 51,800 3,507 Agnew - C136/2004 5 Years (Extended) E 36/782 21/05/2013 20/05/2023 5 BL 37,000 2,505 Agnew - C136/2004 5 Years (Extended) E 36/828 01/07/2014 30/06/2024 5 BL 37,000 2,505 Agnew - C136/2004 5 Years (Extended) E 36/829 01/07/2014 30/06/2024 9 BL 51,800 4,509 Agnew - C136/2004 5 Years (Extended) E 36/836 23/03/2016 22/03/2026 13 BL 37,000 3,444 Lawlers - C014/2003 5 Years (Extended) E 36/849 01/12/2015 30/11/2025 1 BL 11,100 300 Agnew - C136/2004 5 Years (Extended) E 36/859 23/03/2016 22/03/2026 4 BL 22,200 1,060 Lawlers - C014/2003 5 Years (Extended) E 36/867 06/09/2016 05/09/2021 17 BL 22,200 4,504 Lawlers - C014/2003 5 Years E 36/872 08/11/2016 07/11/2021 1 BL 7,400 300 Agnew - C136/2004 5 Years E 36/881 02/07/2018 01/07/2023 4 BL 14,800 776 Lawlers - C014/2003 5 Years E 36/883 14/03/2017 13/03/2022 1 BL 7,400 300 Lawlers - C014/2003 5 Years E 36/889 05/04/2017 04/04/2022 2 BL 14,800 530 Lawlers - C014/2003 5 Years Miscellaneous Licences L 36/143 05/10/2000 04/10/2042 14.00000 HA 204 21 Years (Renewed) L 36/144 04/10/2000 03/10/2042 11.00000 HA 160 21 Years (Renewed) L 36/150 15/11/2000 14/11/2021 5.00000 HA 73 21 Years L 36/152 15/11/2000 14/11/2021 7.00000 HA 102 21 Years L 36/153 15/11/2000 14/11/2021 3.00000 HA 44 21 Years L 36/154 30/11/2000 29/11/2021 2.00000 HA 29 21 Years L 36/156 08/07/2002 07/07/2023 2.20000 HA 44 21 Years
P a g e 21 | 138 Number Grant date Expiry date Area (HA=hectare) (BL=blocks) Min annual expenditure ($) Annual rent ($) Reporting group Term granted L 36/162 12/09/2002 11/09/2023 3.00000 HA 44 21 Years L 36/173 27/07/2005 26/07/2026 2.80000 HA 44 21 Years L 36/177 27/07/2005 26/07/2026 5.00000 HA 73 21 Years L 36/211 16/04/2013 15/04/2034 7.57950 HA 117 21 Years L 36/212 16/04/2013 15/04/2034 11.02000 HA 175 21 Years L 36/224 04/05/2018 03/05/2039 193.36000 HA 2,828 21 Years L 36/226 04/07/2018 03/07/2039 12.36000 HA 190 21 Years L 36/227 03/07/2018 02/07/2039 47.62000 HA 700 21 Years L 36/228 13/08/2018 12/08/2039 371.48950 HA 21 Years General Purpose Leases G 36/36 02/04/1992 01/04/2034 9.95100 HA 146 21 Years (Renewed) G 36/37 02/04/1992 01/04/2034 9.96900 HA 146 21 Years (Renewed) G 36/38 02/04/1992 01/04/2034 9.88700 HA 146 21 Years (Renewed) G 36/39 02/04/1992 01/04/2034 9.96600 HA 146 21 Years (Renewed) G 36/42 07/06/1994 06/06/2036 6.21150 HA 102 21 Years (Renewed) Notes: a) Registered Holder - Agnew Gold Mining Company Pty Limited b) The Qualified persons opinion is that licences and tenements can be renewed or extended as required Source: Gold Fields Australia tenement database 3.5 Mineral rights description The operation of mining and associated activities at Agnew are governed by numerous Western Australian Government Acts. This section summarises published information available from the Western Australian Department of Mines, Industry Regulation and Safety (DMIRS) website. The Western Australian Mining Act 1978 (the WA Mining Act,1978) is the principal legislation governing exploration and mining on land in Western Australia. Licences and leases for, among other things, prospecting, exploration and mining must be obtained pursuant to the requirements of the Mining Act (1978) before the relevant activity can begin. Application fees and annual rental payments are payable in respect of each tenement. Where Native Title has not been extinguished, Native Title legislation may apply to the grant of tenure and some subsequent administrative processes. Heritage legislation may operate to preclude or regulate the disturbance of a particular area. The life of mine reserve has or is reasonably expected to receive grant of tenure. Exploration Licences are granted for five years plus a possible extension of five years and further periods of two years thereafter with 40 % per cent of ground to be surrendered at the end of year six. If the holder of an Exploration Licence establishes indications of an economic mineral deposit and expends a minimum level of investment, it may apply for a Mining Lease which gives the holder exclusive mining rights with respect to all minerals on the property. It is possible for one person to own the surface of the property and for another to own the mineral rights. An application for a Mining Lease must be accompanied by one of the following: A Mining Proposal completed in accordance with the guidelines. A statement of mining operations and a mineralisation report prepared by a Qualified person. A statement of mining operations and a resource report that complies with the JORC Code (Joint Ore Reserves Committee guidelines for Mineral resource and ore reserve reporting) that applies to the Australian Securities Exchange (ASX). The maximum initial term of a Mining Lease is 21 years and the holder has the right to renew the lease for a further period of 21 years. Subsequent renewals are subject to the minister’s discretion and the lease can only be assigned with the consent of the relevant minister.
P a g e 22 | 138 Prescribed minimum annual expenditure commitments and activity reporting requirements apply to holders of Exploration Licences and Mining Leases. Mining operations on tenements in Western Australia must be developed and operated in compliance with various Commonwealth and State legislative requirements. Agnew gold mine is under the control of the following Western Australian Government legislation: Mining Act (1978) Environmental Protection Act (1986) and Environmental Protection Regulations (1987) Environmental Protection (Clearing of Native Vegetation) Regulations (2004) Environmental Protection (Unauthorized Discharge) Regulations (2004) Contaminated Sites Act (2003) Rights in Water and Irrigation Act (1914) Conservation and Land Management Act (1984) Country Areas Water Supply Act (1947) Aboriginal Heritage Act (1972) Mining Rehabilitation Fund Act (2012) Agnew gold mine is also under the authority of the following Commonwealth of Australia Government legislation: Environmental Protection and Biodiversity Conservation Act (1999) National Greenhouse and Energy Reporting Act (2007) The governing Western Australian agencies are the Western Australian Department of Water and Environmental Regulation (DWER), the Western Australian Department of Planning, Lands and Heritage (DPLH) and the Western Australian Department of Mines, Industry Regulation and Safety (DMIRS). Agnew holds regulatory licences and registrations that govern various aspects of environmental management as disclosed in Section 17. Miscellaneous licences are for purposes such as a roads and pipelines. General purpose leases are for purposes such as operating plant and machinery, other infrastructure or depositing tailings. Mineral royalty rates are prescribed under the Mining Regulations 1981. For gold, an ad valorem royalty rate of 2.5 % is applied. 3.6 Encumbrances Other regulatory requirements including those associated with operation and management of mining, rehabilitation and exploration activities are managed under the Western Australian Mining Act (1978) in the form of tenement conditions administered by the Western Australian Department of Mines, Industry Regulation and Safety. Section 17 discloses the remediation and reclamation guarantees that are pertinent to Agnew. Agnew received no fines during 2021. 3.7 Other significant factors and risks There are no other significant factors and risks known at the time of this report that may affect access, title, or the right or ability to perform work on the Property and therefore execute the life of mine plan. If mine expansions are required into areas currently held under an Exploration Licence, conversion to a Mining Lease is required prior to the commencing of mining. This may also trigger negotiations under the Native Title Act 1993 (Cth) with relevant Traditional Owners, which must be undertaken prior to the grant of tenure. Aboriginal cultural
P a g e 23 | 138 heritage consultation, surveys and approvals are required for most mining and exploration activities, which requires engagement with relevant Traditional Owners. In some cases, agreements exist to facilitate this process. The permitting and licencing requirements required to start a new mining operation (or to expand or modify existing operations) may also include local disturbance, clearing, environmental, power, water extraction and waste disposal, which follow well-established authorization protocols with the relevant government authorities. The Qualified person is not aware of any other current or pending licencing or legal matters that may have an influence on the rights to explore or mine for minerals at Agnew. The Qualified person has relied on information provided by the Registrant in preparing its findings and conclusions regarding other significant factors and risks. A review of recent Company public disclosure documents including the annual report (Form 20-F for the 12 months Ended 31 December 2021) do not contain any statements by the directors on any legal proceedings or other material conditions (other than as set out above) that may impact on the Company’s ability to continue mining or exploration activities at Agnew. 3.8 Royalties or similar interest There are no non managed tenements, the Warrida Well Joint venture was dismantled in 2021and there are no royalties or similar interests The Qualified person has reviewed the limited non-managed tenements and is of the opinion that it has not been explored on in 2021. Any discoveries will be considered as attributable to Gold Fields.
P a g e 24 | 138 4 Accessibility, climate, local resources, infrastructure and physiography 4.1 Topography, elevation, and vegetation The topography across Agnew’s property is characterized by flat to undulating plains with elevations ranging from 500 – 540 m above sea level (ASL). Elevated areas correspond to outcrops of bedrock (greenstone) and are separated by extensive areas of sand plain above granitoid intrusives. Sharp breaks in elevation are associated with lateritic mesas, referred to as breakaways. The Agnew operations lie within the Austin Botanical district of the Eremaean botanical province of Western Australia. The vegetation is characterized by low woodland/shrubland on red loams or hardpans, with a total of six vegetation types described in Table 4.1.1. Table 4.1.1: Vegetation types within the Agnew project area Habitat Vegetation Description Flood plains Eremophila galeata open low scrub Gibber plains Acacia aneura (and allied genera) open scrub over Eremophila forrestii subsp. forrestii and Eremophila platycalyx subsp. platycalyx open low scrub B over Ptilotus obovatus var. obovatus open dwarf scrub Hardpan plains Inter groves Acacia aneura (and allied genera) and Acacia ramulosa var. linophylla open scrub over Eremophila forrestii subsp. forrestii and Eremophila spectabilis subsp. brevis open low scrub over Eregrostis eriopoda, Eriachne mucronata and Eriachne helmsii low grass Mulga groves Acacia aneura (and allied genera) open low forest over Eremophila forrestii subsp. forrestii and Eremophila spectabilis subsp brevis heath Unincised drainage lines Acacia aneura (and allied genera) scrub over Eremophila galeata and Acacia tetragonophylla open low scrub over Eriachne mucronata and Eriachne helmsii open low grass Wanderrie sandy bank plains Acacia aneura (and allied genera) and Acacia ramulosa var. linophylla open scrub over Eremophila forrestii subsp. forrestii, Eremophila spectabilis subsp. brevis low scrub over Eragrostis eriopoda and Eriachne helmsii open low grass. Source: Agnew Mine Closure Plan 2020 Vegetation and topsoil, to a depth of approximately 200 millimetres, will be reserved, in piles less than 1 m deep and to the southern end of the proposed disturbance area, where it will not be impacted by machinery. The infrastructure will be removed and topsoil and vegetation will be reapplied to the surface on completion of batching activities. The infrastructure will be removed and topsoil and vegetation will be reapplied to the surface on completion of mining activities. The area will be ripped and seeded with local species subsequent to topsoil replacement. Revegetation of the waste dumps will involve determining the viability of seed in the topsoil, and where necessary making additional applications of seed. Seeds from local plants will be collected and applied to the waste dump and surface rehabilitation. Much of this seed will be harvested from our own onsite seed orchard. Seeds will cover a full range of annuals, herbs, shrubs and tree species. 4.1.1 Lawlers Project Area The most common vegetation communities within the Lawlers area are open to very open Acacia aneura (and allied genera) and/or Acacia craspedocarpa shrubland. Other communities include riparian communities of Mulga (Acacia aneura and allied genera) and River Red Gum (Eucalyptus camuldulensis) and Cue York Gum (Eucalyptus striaticalyx) woodlands. The existing level of diversity will be considered during closure planning and when rehabilitation activities are undertaken, in particular when the seed mixes for revegetation are selected. The Qualified person’s opinion is that the revegetation proposed will adequately remediate any disturbance to the satisfaction of the community and authorities and the revegetation of tailings dams will be in line with Company procedures and will minimize toxins.
P a g e 25 | 138 4.2 Access Access to Agnew is via a sealed road 24km from the Goldfields Highway, which links the town of Leinster with Kalgoorlie to the south (Figure 3.1.1). The Property is also serviced by regular flights from Perth to an airport operated by BHP Billiton Nickel West Pty Ltd approximately 15km to the north of Leinster. 4.3 Climate Agnew is in a semi-arid environment with a mean daily maximum temperature of 37.3 °C in January and 18.7 °C in July. Mean minimum temperatures are 23.2 °C in January and 6.1 °C in July. Temperature extremes range from below freezing on winter nights to above 45 °C on summer days. Mean annual rainfall is 275 mm and although the mean monthly rainfall is relatively consistent, high rainfall events can occur during late summer and early autumn due to remnant cyclonic activity. However, these events are relatively rare and have little effect on mine operations. The most reliable rains occur in winter from cold fronts arriving from the west, and cloud bands from the northwest. January and February are the wettest months with an average of above 40 mm. Evaporation rates are high and there are no naturally occurring perennial lakes, streams or rivers in the region. The mine regularly conducts climate change risk and vulnerability assessments, and develop adaptation and mitigation plans to address and identified risks. There are no extreme climate conditions are experienced that materially affect operations. 4.4 Infrastructure Agnew is currently an underground gold mining operation with associated infrastructure and facilities that operate year-round. In addition to the Waroonga and New Holland underground mines accessed by declines, major infrastructure owned and operated by the Company includes a 1.3 Mt per annum carbon in pulp process plant, tailings storage facilities, paste plant, haul roads, administration centres and an accommodation camp. The process plant and main administration offices are located directly west of the historic Agnew town (Figure 3.1.1). The process plant consists of a tertiary crushing circuit, a two-stage ball milling circuit with gravity and a conventional carbon in pulp gold recovery circuit. Other significant facilities in this area include engineering workshops, fuel storage, a medical centre, warehouses and reagent facility. Mining activities have removed most tailings storage facility ‘TSF 1’, and the small amount of material that remains is buried under tailings storage facility ‘TSF 2’ and a haul road. TSF 2 is a decommissioned above ground paddock tailings storage facility. The tailings in TSF 2 are dry and present a low risk both from a safety and environmental perspective and are being extracted for use in the paste plant to enable underground stope void support. Tailings storage facility 3 ‘TSF 3’ is an in-pit facility at the former Redeemer open pit. Tailings storage facility 4 ‘TSF 4’) is also an in-pit facility at the former Songvang open pit. All the Lawlers tailing storage facilities are closed and rehabilitated. Both underground operations have a dedicated facility for mining engineering, engineering workshops, geology, mine safety, mobile maintenance, warehousing, fuel storage and washdown areas. Other infrastructure maintained on site to support the mining operation are a surface paste plant and refrigeration and cooling for underground ventilation. Water is sourced from the underground mines, former open pits and three borefields: Fairyland, New Woman and EMU. Fairyland is the main source of bore water and hydrogeological studies recently completed confirm that the aquifer can support the Agnew life of mine reserve operations. Bore water is stored in a historic open pit. The bulk of the water is currently supplied from the mining operations and recovered from the in-pit tailings facility and previously mined pits. The water reticulation recovers water from the water storage open pit. A recently commissioned hybrid renewable power plant owned and operated by EDL Energy comprising solar panels, wind turbines, and battery power storage power provides Agnew with 50 % to 60 % renewable energy, and with gas/diesel back-up is a key contributor to the security of power for the life of mine.
P a g e 26 | 138 The majority of the Agnew workforce are fly-in fly-out (FIFO) from Perth with a small number of employees residing in Leinster and other regional centres including Geraldton and Kalgoorlie. Work rosters are predominantly based on 8 days on, 6 days off cycles; however, some contractors operate on longer rosters such as 2 weeks on, 1 week off. Supplies are delivered to site via road transport from either Kalgoorlie or Perth via the Goldfields and Great Northern Highways. The closest population centre is the town of Leinster with approximately 1,300 people. The town was established in 1976 as a dormitory town predominantly for workers at the nearby nickel mines. Facilities include a supermarket, post office, service station, primary school, tavern and various sporting facilities. 4.5 Book Value The economic analysis disclosed in chapter 19 is in respect of attributable Mineral reserves only and excludes Mineral resources and lower grade material. The assumptions, parameters and cashflows are only intended to support the reserve declaration of the operation. Certain assumptions and estimates might differ from the long-term outlook or actual results of the operation, including the commodity prices used, which are materially different from current spot prices. Changes in these assumptions may result in significant changes to mine plans, models and the NPV of the operation. The Mineral reserves will therefore not necessarily represent the total future economic benefit that can be derived from the Property. Net book value of property plant and equipment consists mainly out of land, mining infrastructure, mine development, mineral and surface rights and processing plant related assets of the Property. Agnew has a book value of $280.5. The Qualified person is of the opinion that the book value estimated as described is expected to be different to the NPV for the attributable reserve only.
P a g e 27 | 138 5 History, previous owners and operators Gold was discovered at Lawlers, 10km south of Agnew township, in 1894 (Figure 3.1.1). The Waroonga mine at Agnew was also developed around this time with ore trammed to the Great Eastern mine at Lawlers for treatment. The Waroonga mine was closed in 1912 due to poor performance and was subsequently purchased by East Murchison United Limited (EMU) in 1934. A treatment plant was constructed in 1936 and the mine, now known as the EMU mine, operated until its closure in 1948 due to high groundwater inflows and corporate issues. Despite further exploration by the Kim Syndicate, Western Australian Mines Department and Western Mining Corporation Holdings Limited from 1948 to 1975, including the sinking of a 63 m shaft, funds to develop the orebodies could not be raised. Western Mining Corporation exercised an option to purchase the EMU mine in 1976 after intersecting gold mineralisation below the old workings. Percussion and diamond drilling was undertaken by Western Mining Corporation to test the open pit potential of the area. This was followed by test pitting in 1985 and full-scale open pit mining from 1986, with ore treated at the 0.5 Mt per annum EMU processing facility. Western Mining Corporation also entered into a joint venture with Nord Australex Pty Ltd in 1985 to explore for EMU style mineralisation to the south of Agnew, leading to the discovery of the Redeemer and Deliverer orebodies. Open pit mining commenced at Redeemer in 1988. Forsayth NL purchased the Great Eastern leases at Lawlers in 1984, with open pit mining commencing at Great Eastern in 1986 followed by the development of McCaffery and several smaller satellite open pits. All ore was treated at Forsayth’s processing facility located at Great Eastern. The Cox orebody was discovered by Asarco Australia 400 m south of Deliverer in 1987. A small open pit was developed with the ore treated at Forsayth’s facility. Western Mining Corporation subsequently discovered the Crusader orebody to the immediate north of Cox. During 1989, the throughput of the EMU plant was increased to 1.3 Mt per annum and underground operations commenced at EMU followed by Redeemer in 1990. Forsayth discovered the Genesis-New Holland deposits to the immediate northwest of EMU in 1990 with two open pit operations subsequently developed. In 1992, underground mining was suspended at EMU following a major flood event. Western Mining Corporation purchased the Cox leases from Asarco and extended the open pit. Forsayth was acquired by Plutonic Resources Ltd who continued to operate the Genesis-New Holland mine and discovered and developed the Fairyland open pit in the southeast of the Property. In 1994, the Crusader underground mine was developed by Western Mining Corporation. Homestake Mining Company acquired Plutonic Resources in 1998 and commenced the New Holland underground mine. During 2001, Gold Fields acquired Agnew from Western Mining Corporation and Barrick Gold merged with Homestake. A decline was developed to access the Kim and Main lodes at Waroonga in 2002 following the closure of the Redeemer underground mine. Infill and extensional drilling resumed on the Songvang open pit deposit in the south of the Property. During 2003 and 2004, open pit mining ceased at Waroonga and an exploration drive was developed into the Rajah lode at the northern end of the open pit. Ore production from the Songvang open pit commenced in 2005 along with trial stoping at Waroonga Main lode. Ongoing drilling at Waroonga continued to extend the known limits of Kim and Main lodes with the high-grade Fitzroy, Bengal and Hastings shoots (or FBH lodes) discovered beneath Main lode in 2011. A cut-back of the Songvang northern pit was completed in 2012. The Company acquired the Lawlers property from Barrick Gold in September 2013 and integrated the New Holland complex with Waroonga following closure of the Lawlers process plant.
P a g e 28 | 138 The Qualified person is of the opinion that the historic exploration results have been superseded and supplemented by more recent exploration undertaken by Gold Fields for areas of current interest and that any historic errors or deficiencies will have little influence on the current Mineral resource models or the life of mine reserves.
P a g e 29 | 138 6 Geological setting, mineralisation, and deposit 6.1 Geological setting Agnew is located in the northern portion of the north-northwest trending Archean Norseman-Wiluna Greenstone Belt, which forms part of the Yilgarn Craton, a 2.7 Ga granite-greenstone terrain in southern Western Australia. The rocks of the belt comprise abundant tholeiitic and komatiitic volcanic rocks, cherts, sulphidic and albitic sedimentary rocks, and a chain of discrete felsic volcanic centres. There is limited banded iron formation (BIF) compared with the other greenstone belts in the Yilgarn Craton. The gross structure is markedly linear, with north- northwest trending strike-slip faults traceable for hundreds of kilometres, which disrupt the greenstone belt into fault- bound domains. In comparison to other greenstone belts in the Yilgarn Craton, the Norseman-Wiluna Greenstone Belt is enriched in gold and nickel mineralisation. The stratigraphic succession in the Agnew area comprises tholeiitic basalts, high-Mg basalts and ultramafic flows over two magmatic cycles. The lower mafic/ultramafic volcanic pile is intruded by a series of layered mafic intrusions, fractionated from quartz dolerite roofs to pyroxenite basement. Unconformably overlying the lower Agnew greenstone sequence are two sedimentary basins; the Vivien Formation volcaniclastics folded around the north-plunging Mt White syncline in the north of the Property and conglomerates, arenaceous metasediments and greywackes of the Scotty Creek Formation to the west of the Property. Plutonic rocks ranging in composition from tonalite to monzogranite form the Lawlers granitic complex and intrude the hinge of the north-plunging Lawlers anticline in the south of the Property. The succession is metamorphosed to upper greenschist-lower amphibolite metamorphic facies. The Waroonga, New Holland and Redeemer complexes are situated on the western limb of the Lawlers Anticline in proximity to the north-northeast trending EMU shear. Further west, the Scotty Creek metasediments are in fault contact with the regional-scale, Waroonga Shear flanking granite-gneiss terrain. The Archean basement rocks range from unweathered outcrop to deeply weathered under Tertiary and Quaternary regolith. The weathering horizons are variably exposed, stripped or buried by localized thick accumulations of Permian sedimentary rocks or blanketed by more recent sediments that have in turn been lateritised. The depth of weathering is strongly controlled by rock-type, with ultramafic to mafic rocks generally being more susceptible to weathering than intermediate to felsic rocks. The regional geology is shown in Figure 6.1.1 with a stratigraphic column presented in Figure 6.1.2.
P a g e 30 | 138 Figure 6.1.1: Generalized geology of Agnew Source: Agnew CPR, 2021
P a g e 31 | 138 Figure 6.1.2: Stratigraphic column of Lawlers anticline in Western Australia Notes: a) Modified from Beardsmore, 2002 Source: Agnew CPR, 2021
P a g e 32 | 138 6.2 Mineralisation Gold deposits along the Norseman-Wiluna Greenstone Belt are hosted within a diverse range of rocks, including basalts and dolerites, fine to coarse-grained sedimentary rocks, and felsic to intermediate intrusives. Host rocks are commonly metamorphosed to greenschist or lower amphibolite facies. Gold mineralisation is typically structurally controlled, occurring within a network of shear zones proximal to major regional faults. The most important gold mineralisation styles are shear hosted quartz-carbonate bearing breccia lodes and associated quartz vein arrays, together with finely disseminated gold associated with zones of strong hydrothermal alteration. Alteration comprises silica or albite-rich zones, associated with ankerite, sericite, biotite or amphibole, together with pyrite, pyrrhotite or arsenopyrite as sulphide-bearing phases. The most substantial gold deposits and the focus of most previous exploration and mining activity at Agnew are located along the western limb of the Lawlers anticline (Waroonga, Redeemer and New Holland complexes) spatially related to the north-northwest trending Waroonga and EMU shears. The major deposits are listed in Table 7.5.1. The continuity of the major deposits is. included in Section 11.1.6. Although all Agnew deposits broadly occur at the intersections between structures and stratigraphy, there are subtle differences in alteration and mineralisation that are controlled in part by the local host rock chemistry. Mineralisation zones are discontinuous with short range predictability. Significant deposits are also found on the eastern limb (e.g. McCaffery, Fairyland) and associated with late-stage geological cross-structures (Lawlers). These deposits were explored and mined by previous owners of the Property. While most of the western limb deposits are broadly related to intersections between structures and mafic-ultramafic stratigraphy, there are subtle differences in alteration and mineralisation controlled in part by the local host rock chemistry. Songvang is unusual in its relatively high lead, silver and fluorine content, possibly reflecting input from tonalite and porphyry intrusions. There also appears to be a slight decline in mineralisation temperatures from south to north, associated with the north plunge of the Lawlers anticline and resultant erosion of the overlying, lower temperature rocks to the south. This temperature change is reflected in the changing mineralisation styles from south to north, with biotite-garnet alteration assemblages dominating to the south and quartz veining to the north. The geological model and basis of the exploration programme is guided by a structurally controlled orogenic gold deposit model. Table 6.2.1: Summary of deposit dimensions, geological setting and mineralisation style Mineral resource Host rock Structure Lode style Alteration assemblage Main domain Length (m) Width (m) Depth (m) outer inner Claudius Basalt Sub-vertical NW-SE and N-S shearing Shear intersection with basalt/ultramafic contact Chlorite ± epidote Chlorite, magnetite ± biotite ± epidote Basalt lode 830 m 150 m 55 m Maria Scotty Creek Sandstone / Conglomerate Sub-vertical N-S shearing (axial planar to Lawlers anticline.) Subvertical quartz breccia vein and/or tension veins Arsenopyrite-silicification- quartz Quartz-silicification- arsenopyrite Main lode 430 m 85 m 2 m Cams Cams gabbro, mafics and felsic porphyry intrusions NNE striking shallow west dipping and ENE striking shallow NW dipping Sheared quartz veins silica-sericite-limonite Quartz-pyrite-chalcopyrite Main lode 100 m 85 m 8 m Redeemer Zone 2 Scotty Creek Sandstone / Conglomerate Sub-vertical N-S shearing (axial planar to Lawlers anticline.) Subvertical quartz breccia vein and/or tension veins Arsenopyrite-silicification- quartz Quartz-silicification- arsenopyrite- Zone 2 N Core1 1300 m 500 m 1.5 m Redeemer North Mafic Conglomerate Sub-vertical N-S shearing Biotite, chlorite alteration. along parallel vertical shears Chlorite, actinolite Biotite, chlorite, actinolite RN1 Core 1 400 m 200 m 6 m Barren Lands Scotty Creek Sandstone / Siltstone and Conglomerate Sub-vertical N-S shearing Subvertical to west- dipping quartz breccia vein Chlorite Quartz-carbonate- arsenopyrite ± scheelite ± galena Main lode 690 m 125 m 1.3 m 450 South Scotty Creek Sandstone / Ultramafic Conglomerate Sub-vertical N-S shearing (axial planar to Lawlers anticline. Reverse Sinistral) West dipping quartz breccia vein and/or tension veins Sandstone Arsenopyrite- silicification-quartz Ultramafic Conglomerate actinolite-chlorite-talc- pyrite Sandstone Quartz- silicification-arsenopyrite Ultramafic Conglomerate Quartz-arsenopyrite-pyrite- actinolite-chlorite-talc HW lode Cross lode 430 m 30 m 160 m 30 m 3 m 14 m
P a g e 33 | 138 Mineral resource Host rock Structure Lode style Alteration assemblage Main domain Length (m) Width (m) Depth (m) outer inner Kim Scotty Creek Sandstone / Ultramafic Conglomerate Sub-vertical N-S shearing (axial planar to Lawlers anticline. Reverse Sinistral) West dipping quartz breccia vein and/or tension veins Sandstone Arsenopyrite- silicification-quartz Ultramafic Conglomerate actinolite-chlorite-talc- pyrite Sandstone Quartz-silicification- arsenopyrite Ultramafic Conglomerate Quartz-arsenopyrite-pyrite- actinolite-chlorite-talc Kim lode 1370 m 420 m 1.5 m FBH Scotty Creek Sandstone / Ultramafic Conglomerate Sub-vertical N-S shearing (axial planar to Lawlers anticline. Reverse Sinistral) West dipping quartz breccia vein and/or tension veins Sandstone Arsenopyrite- silicification-quartz Ultramafic Conglomerate actinolite-chlorite-talc- pyrite Sandstone Quartz-silicification- arsenopyrite Ultramafic Conglomerate Quartz-arsenopyrite-pyrite- actinolite-chlorite-talc Bengal lode 1050 m 160 m 2 m Kath Scotty Creek Sandstone / Ultramafic Conglomerate Sub-vertical N-S shearing (axial planar to Lawlers anticline. Reverse Sinistral) West dipping quartz breccia vein and/or tension veins Sandstone Arsenopyrite- silicification-quartz Ultramafic Conglomerate actinolite-chlorite-talc- pyrite Sandstone Quartz-silicification- arsenopyrite Ultramafic Conglomerate Quartz-arsenopyrite-pyrite- actinolite-chlorite-talc Kath lode 1650 m 260 m 2.5 m Waroonga North Scotty Creek Sandstone / Ultramafic Conglomerate Sub-vertical N-S shearing (axial planar to Lawlers anticline. Reverse Sinistral) West dipping quartz breccia vein and/or tension veins Sandstone Arsenopyrite- silicification-quartz Ultramafic Conglomerate actinolite-chlorite-talc- pyrite Sandstone Quartz-silicification- arsenopyrite Ultramafic Conglomerate quartz-arsenopyrite-pyrite- actinolite-chlorite-talc Aurora lode 1150 m 90 m 1.5 m Main North & South Rajah Scotty Creek Sandstone / Ultramafic Conglomerate Sub-vertical N-S shearing (axial planar to Lawlers anticline. Reverse Sinistral) West dipping quartz breccia vein and/or tension veins Sandstone Arsenopyrite- silicification-quartz Ultramafic Conglomerate actinolite-chlorite-talc- pyrite Sandstone quartz-silicification- arsenopyrite Ultramafic Conglomerate Quartz-arsenopyrite-pyrite- actinolite-chlorite-talc HW lode Rajah 480 m 600 m 500 m 200 m 3 m 1 m Lower Genesis (LGX) Scotty Creek Sandstone NE-SW compression resulting in shallow WSW dipping thrust structure array Hydrothermal 500 series lode Combination of west dipping quartz breccia/ laminations and Easterly conjugate quartz veins Halo Silica – arsenopyrite – sericite - pyrite 500 series quartz-albite-rutile Westerly quartz-rutile-arsenopyrite- pyrite ± galena ± sphalerite Easterly quartz ± arsenopyrite 500 series Westerlies Easterlies Sandstone host unit 2300 m 250 m variable / short 900 m 300 m 100 m variable / short 600 m 10 m 5 m variable / short 100 m Cinderella Scotty Creek Sandstone / siltstone Compression resulting in shallow east dipping thrust structure array Combination of west dipping quartz breccia/ laminations and Easterly conjugate quartz veins Halo Silica – arsenopyrite – sericite - pyrite Westerly quartz-rutile-arsenopyrite- pyrite ± galena ± sphalerite Easterly quartz ± arsenopyrite 620832 621410 621430 200 m 400 m 120 m 60 m 100 m 40 m 1 m 0.5 m 2 m Sheba Scotty Creek Sandstone / siltstone NE-SW compression resulting in shallow WSW dipping thrust structure array Combination of west and east dipping quartz breccia/ laminations and Easterly conjugate quartz veins Halo Silica – arsenopyrite – sericite - pyrite Westerly quartz-rutile-arsenopyrite- pyrite ± galena ± sphalerite Easterly quartz ± arsenopyrite± galena ± sphalerite Sheba South lode Easterlies Sandstone host unit 3000 m variable / short 700 m 100 m variable / short 760 m 0.5 m variable / short 70 m Upper NH & Upper Genesis Scotty Creek Sandstone NE-SW compression resulting in shallow WSW dipping thrust structure array Combination of west dipping quartz breccia/ laminations and Easterly conjugate quartz veins Halo Silica – arsenopyrite – sericite - pyrite Westerly quartz-rutile-arsenopyrite- pyrite ± galena ± sphalerite Easterly quartz ± arsenopyrite Westerlies Easterlies Sandstone host unit 380 m variable / short 1900 m 60 m variable / short 700 m 1.5 m variable / short 100 m GE200 Scotty Creek Sandstone NE-SW compression resulting in shallow WSW dipping thrust structure array Combination of west dipping quartz breccia/ laminations and Easterly conjugate quartz veins Halo Silica – arsenopyrite – sericite - pyrite Westerly quartz-rutile-arsenopyrite- pyrite ± galena ± sphalerite Easterly quartz ± arsenopyrite 200 series 950 m 250 m 3 m Himitsu Scotty Creek Sandstone / siltstone Compression resulting in shallow east dipping thrust structure array Combination of west dipping quartz breccia/ laminations and Easterly conjugate quartz veins Halo Silica – arsenopyrite – sericite - pyrite Westerly quartz-rutile-arsenopyrite- pyrite ± galena ± sphalerite Easterly quartz ± arsenopyrite Westerlies 450 m 50 m 1 m Hidden Secret, Glasgow Lass, & Dobra Serica Scotty Creek Sandstone Compression resulting in shallow dipping thrust structure array Combination of west and east dipping conjugate quartz veins Halo Silica – arsenopyrite – sericite - pyrite Easterly quartz ± arsenopyrite Easterlies Sandstone host unit variable / short 1400 m variable / short 600 m variable / short 50 m Leviathan North Mt Goodes Basalt and Dolerite/Gabbro NW-SE striking moderately NE dipping shear zones Combination of NE dipping quartz veins and overlying sub-horizontal supergene zones Supergene: silcrete Primary: quartz- arsenopyrite-pyrite Flat lode 500 m 150 m 4 m Notes: a) The dimensions for only the primary domain(s) are shown in the table. b) All dimensions are approximations, as they vary within the deposits. c) Easterlies style vein s are small scale veins and highly variable in dimensions. d) Sandstone unit hosts small scale easterlies style quartz veins and is not continuously mineralized Source of data; Agnew CPR 2021
P a g e 34 | 138 The New Holland complex is located between the Waroonga and EMU shears within a locally mineralized zone known as the Glasgow Lass trend, hosted by sedimentary rocks of the Scotty Creek Formation. The sedimentary rocks at this locality strike north-south and dip steeply to the west. Gold mineralisation is largely confined to quartz veins within sandstone and siltstone. Ore zones occur in discrete veins at low angles, dipping predominantly to the east. Higher grade westerly dipping quartz veins are also present in sandstone. The eastern contact of the sandstone is erosional and sharp, resting on siltstone. The western contact is gradational, fining to very fine-grained sand and siltstone.
P a g e 35 | 138 7 Exploration 7.1 Exploration Given Agnew is a well-established production stage property with a significant Mineral resource and reserve base, it is not disclosing any exploration targets. Agnew has been owned and operated by Gold Fields for approximately two decades and has a track record over this period of consistent discovery, resource development and reserve generation on an annual basis to replace production depletion and maintain the life of mine. Agnew’s strategy of consistent annual investment in brownfield (on-lease or near-mine extensional) exploration to extend mine life is viewed as offering the best route to lower-cost, lower-risk resource and reserve growth in well-understood geological environments. This approach has proved successful and continues to deliver operational flexibility and life extension. The exploration is configured to deliver a balanced project pipeline that includes identifying early-stage targets with project lead times of typically four to five years, combined with progressing more advanced projects that can potentially deliver new mining opportunities within the next two to three years. Exploration activities are predominantly focused on resource extension to known ore bodies and resource infill drilling to enhance existing resource models and to a lesser degree on initial concept drilling and validation of brownfield targets. This is achieved by collecting and interpreting foundational datasets and systematically testing the highest probability targets. Foundational datasets include all broad-spaced drilling for geochemistry and geology, high-resolution geophysical surveys, plus detailed interpretation of all datasets. The site strategy and future production requirements are considered as part of the annual and longer-term exploration budget allocation, further ensuring timeous resource and reserve replacement and alignment to strategic plan objectives. When a potential orebody has been discovered, exploration is extended and intensified in conjunction with comprehensive infill drilling to enable clearer definition of the orebody and its technical and economic characteristics to profile the potential portions to be mined. Geological, geochemical, geophysical, geostatistical, geotechnical and geometallurgical techniques are constantly refined and modernized to improve effectiveness and the economic viability of prospecting and mining activities. The regional location of Agnew Gold Mine is shown in Figure 7.1.1 while the individual property boundary and detailed tenement holdings are shown in Figure 3.4.1. Exploration programmes conducted on the property during the period 1 January 2021 to 31 December 2021 were focused on extending known mineralization at the Waroonga, New Holland and Greater Redeemer complexes (Figure 7.1.1). For the purpose of this report, exploration programmes include regional exploration through to infill programmes to generate an Indicated or Inferred Mineral resource (Resource Definition). Grade control activities including drilling are not considered in this report.
P a g e 36 | 138 Figure 7.1.1: Agnew Gold Mine location Source: Agnew CPR, 2021 7.1.1 Geological Setting Agnew Gold Mine is situated in the northern portion of the Norseman-Wiluna Greenstone Belt of the Yilgarn Craton, Western Australia. Locally the Belt comprises a sequence of mafic to ultramafic volcanics and associated interflow sediments, which have been folded to form the Lawlers Anticline. The Lawlers Anticline plunges in a northerly direction at approximately 30°. The core of the anticline has been intruded by granodiorite, which in turn has been intruded by late stage leucogranite. All gold mineralisation is shear hosted and economic mineralisation commonly extends vertically for in excess of 1km. Refer to Section 6.1 for additional information. 7.1.2 Exploration Programme Exploration continues to focus on extensions at both the Waroonga and New Holland mineralized systems. The existing mines are supported by on-going exploration and resource definition programmes aimed at extending the life of the current mines and identifying new opportunities/projects in the area. Diamond drilling is the primary exploration activity relevant to this report and the estimation of Mineral resources. During 2021, Agnew Gold Mine spent US$18.4m (A$24.5m) on Exploration and Resource Definition activities. The Qualified person’s opinion of the 2021 exploration programmes and results is: a) All procedures and parameters applied to the surveys and investigations are appropriate for the style of mineralisation being prospected
P a g e 37 | 138 b) The exploration programmes have confirmed continuity of geology and controls on gold mineralisation in key areas c) There were no material variations encountered during the 2021 exploration programmes d) Based on the 2021 exploration and results a 2022 exploration budget has been approved to retain traction on the programmes and to progress leading projects 7.2 Drilling 7.2.1 Type and extent Material exploration drilling during 2021 was focused on extending known mineralisation at the Waroonga, New Holland and Greater Redeemer complexes to support short to medium term expansion of the current mining footprints. Drilling activities beyond these areas were undertaken on early-stage targets to explore for a longer-term pipeline of projects with potential to provide new mining fronts in the future. Agnew is a production stage property and the results from this work are not considered material for the purpose of this report. The Qualified person’s opinion is that a register of individual drill results would be too voluminous, potentially misleading and not relevant to the current reporting of Mineral resources and Mineral reserves. All drilling is completed by third party contractors under formalized contracts to quality specifications with routine validation and monitoring by Agnew staff. Surface diamond core drilling is generally NQ2 or HQ diameter, while underground diamond core drilling is usually NQ2 core: standard diameter 50.6 mm. (2 inches) or LTK60 diameter. Underground drilling is exclusively diamond core drilling carried out by contractor Barminco, while all surface diamond core drilling is carried out by DDH1 with Strike drilling subcontracted for reverse circulation (RC) percussion and aircore (AC) drilling. During 2021, 80,517 m of exploration and resource definition drilling was completed, of which 7,539 m was Reverse Circulation (RC), 48,263 m was surface diamond drilling (DD) and 24,715 m was underground diamond drilling (DD). A total of 181,978 samples have been sent to an offsite certified laboratory for analysis, of these 63,409 are from surface drilling and 118,552 are from the UG drilling operations. In-fill drilling at Waroonga underground further defined the significant Kath Lower lode, which remains open down- plunge. Extensional and in-fill drilling was also completed at the Waroonga North lodes, replacing ore depleted by mining. Down-plunge extensional drilling of the Kim lode continued to return positive results. Step-out and in-fill drilling is planned for the Waroonga North, Kath Lower, Main South, FBH South and Kim South areas. At New Holland, extensional and exploration drilling was conducted at Hidden Secret, Sheba South and Sheba North (Figure 7.2.2), with minor drilling in the New Holland and Greater Genesis areas. The drilling at Sheba South defined a significant high-grade extension of the Sheba lode. Further drilling at Sheba South, Sheba North and Hidden Secret is planned. Drilling continued to grow the Redeemer complex mineralized footprint (Figure 7.2.3). At Barren Lands, resource conversion drilling down-plunge of the proposed Barren Lands open pit added to the underground Mineral reserve, which remains open down-plunge. Drilling the Redeemer North lode confirmed the geometry and thickness of the mineralisation, resulting in the reinstatement of Redeemer North as a Mineral resource. The Redeemer complex is located along the western limb of the Lawlers Anticline within north-east striking, steeply west dipping to slightly overturned greenstone sequences, consisting of mafic and ultramafic volcanics, dolerite and gabbro intrusives, and Mine Corridor Conglomerate (MCC) with mafic to ultramafic clasts. Redeemer Basalt is a mafic sequence located beneath the footwall contact to the MCC, and its formation and position is likely related to a sub-basin low depositional feature. Mineralisation within Redeemer Basalt has a 200 m strike extent and 400 m dip extent. MCC- hosted mineralisation has a 250 m strike extent and 150 m dip extent. The system in general is vertical to steeply west dipping (approximately 80 °). Infill drilling resulted in an estimation with 950 kt at 6.87 g/t for 210 koz Indicated (3.5 g/t cut-off) and 161 kt at 6.46 g/t for 56 koz Inferred (3.5 g/t cut-off).
P a g e 38 | 138 Exploration planned in 2022 includes Mineral resource conversion drilling at Barren Lands, Redeemer North and Redeemer Zone 2 North, and testing of down-plunge extensions. Procedures Drill planning and design is typically completed either in Datamine® or Leapfrog® software packages. Drill hole collars are set-out pre- drilling by Gold Fields Surveyors. The drill rigs are aligned using either set-up pins, back sights pegs or auto aligners (fibreoptic gyros) mounted onto the first drill rod to ensure accuracy is maintained for the down hole dip and direction. Drill rig supervision is performed by a suitable Gold Fields representative. Surface drilling is carried out using a SandvikDE880 drill rig mounted on a MAN 8 x 8 truck with a pull back of 68000 Nm and a drilling depth capability of 3200 m. Underground drill rigs used are Epiroc U6 and U8 drill rigs and Boart Longyear LM series, electric-hydraulic diamond drill rigs capable of deep hole and directional drilling mounted on mobile carriers for quicker move times. All drilling contractors have permanent supervision which are in constant contact with geologists on progress and direction of the hole, monitoring depth, orientation, direction and lithological units. An electronic plod and record keeping operating system is used to allow geological and production information to be made immediately available. Surface collars are surveyed using RTK GPS (Real Tie Kinetic Global Positioning System). Proposed drill holes are initially located by survey. Surface collars are surveyed using differential GPS. Once drilled, all diamond drilling, reverse circulation, aircore and sludge holes have their collar positions located by Agnew surveyors to within ±20 mm accuracy. Down-hole surveys are completed for all drill holes used in Mineral resource estimates using either a multi-shot camera, Eastman single-shot survey or down-hole gyroscopic surveys. Due to the relatively shallow depth of the surface aircore and reverse circulation drilling (<200 m) these holes are generally not down hole surveyed since minimal hole deviation is encountered over 200 m. When reverse circulation is used for diamond drill hole pre-collars, these are surveyed using standard down hole methods. At Waroonga, most mine scale maps and sections are reproduced in the local grid (EMU Grid) which is oriented plus 19° 48' from MGA grid north. This orientation is preferred because it is parallel to the general lithological strike and facilitates simplified map and section making and drill planning. All New Holland underground mining operations at Agnew Gold Mine, formerly known as Lawlers Gold Mine, are established and coordinated in a local grid commonly known as GLT, or Glasgow Lass Trend. GLT was originally established by ways of a simple truncation, or shift, from the “Australian Map Grid 1966” which is more commonly known as AMG66. The original truncation is as follows: AMG66 Northing – 6,890,000 = GLT Northing AMG66 Easting – 260,000 = GLT Easting Due to the reference between the two grids being a simple truncation there is no grid rotation required, GLT grid North is the same as AMG grid North. In 1994 AGM66 was revised and replaced with a new grid called the Map Grid of Australia 1994 (MGA94) which is currently the grid in use across Australia has recently been replaced with the Map Grid of Australia 2020 (MGA 2020). The difference between AMG66, and MGA94 and MGA 2020 is still a simple truncation therefore still does not require and grid rotation between the two grid Norths. All MGA grids are broken into north/south orientated “Zones” across Australia to adjust for curvature of the earth and scaling factors. Agnew Gold Mine and its tenements are located in the western side of Zone 51 (Z51). Most regional scale maps and sections (i.e. outside of the mine area) will be reproduced utilizing MGA94-Z51 co- ordinates as MGA94 is still current accepted even though MGA2020 is now an active grid.
P a g e 39 | 138 For the local grids, false heights are added to AHD (Australian Height Datum) as follows: GLT = AHD + 1,000 m EMU = AHD + 10,000 m All DD core is processed at one of two core sheds on site. The New holland core shed processes all of the underground core drilled and the EMU core shed processes all of the exploration drilled core. Diamond core drilling is oriented using an Acer Easy Mark or similar tool to facilitate collection of structural data that aids in geological interpretation. This is completed for exploration and grade control drilling by placing the drill core in a “V” rail such that the orientation marks line up flush against one of the rail edges and the core ends match up. Logging of drilled material is completed on-site by suitable staff. Standard logging conventions (lithology, alteration, structure and quartz veining) are used to capture information from the drill core. Most of the observations are captured electronically using Toughbooks. Numerous validation steps are built into the acQuire® logging software and all codes are selected from drop down lists. The data is loaded into the mine acQuire® database. Magnetic susceptibility readings are taken every metre from exploration core. Core loss is also recorded in the database and some loss occurs locally when drilling through fault/shear zones which may be altered or weathered and not very competent. Rock quality designation (RQD) and orientations of structures and contacts are measured after the core is oriented. Density may also be measured and recorded in the database for specified samples. Within the production environment, full core sampling is used and sample pulps are stored on-site. Half and quarter core samples are collected within the exploration space and remaining sections of drill core is stored on-site. Diamond drill core sample lengths can be variable in a mineralized zone, though usually no longer than 1 m. This enables the capture of assay data for narrow structures and localized grade variations. The core samples are based on geological contacts. Wet core is digitally photographed and samples taken according to a cut sheet compiled by a geologist. The diamond core drilling core is cut by field assistants. Half or full core samples, usually 1.0 m in length, are bagged in pre- numbered calico bags and submitted for analysis with a sample submission form. The insertion of blanks is under the control of the geologist and certified reference material (standards) are inserted to meet Gold Fields and Agnew protocols per batch. Diamond drilling typically provides >95 % sample recovery, and where core loss occurs, it must be recorded. reverse circulation sample weights are monitored to indicate core loss and actioned accordingly when needed. Pre-1995 drilling did not utilise core blocks, making estimation of core recovery difficult prior to that time. Where possible, whole aircore and reverse circulation percussion samples are recovered from the drill rig at 1 m intervals through the cyclone splitter site reducing material to approximately 7 kg to 8 kg. reverse circulation holes are logged and sampled using similar codes to diamond core drilling. Reverse circulation sampling and recovery factors are monitored and actioned accordingly when needed. Periodic reviews of early drilling assay results and bias are carried out on historical prospects where new drilling is completed. Q-Q Plots of the re-drills and original holes are correlated, and any bias (positive/negative) identified. This is utilized in any future interpretations and modelling. The re-drill and original hole testing may not always be like for like. The cause of any bias compared with historic data is often due to the comparison being conducted on the entire dataset with no domain or sub-domain separation. Splitting the mineralisation into appropriate geological domains normally allows a true comparison of the samples sourced by the different drilling techniques. This demonstrates that a true representation of the population is being sampled with no clear adverse effects through the sampling method. The Qualified person’s opinion of the 2021 exploration and resource extension drilling is:
P a g e 40 | 138 (a) All drilling and exploration field activities are supervised to ensure health and safety and maintain appropriate technical standards. a) The drill hole surveys are adequate by type and length for the intended purpose. b) Utilising orientated core significantly enhances recorded information to assist with 3-D modelling c) The drill hole database and subsequent modelling aligns to core recovery losses and should not cause material errors d) Post QA/QC screening and validation exploration results are incorporated into the estimation of Mineral resources; the categorisation of Mineral resources is described in chapter 11. e) Validated exploration results are used in the 31 December 2021 Mineral resource estimation. f) Individual exploration drill hole information is not viewed as significant or material to the Mineral resource and Mineral reserve reporting at Agnew and consequently exploration data is not presented 7.2.2 Results Drilling completed during 2021 was focused on infilling and extending the Waroonga, New Holland and Redeemer complexes. The drill spacing is down to approximately 40 x 40 m and is appropriate to model the geological continuity and derive resource models to the indicated or inferred categories where specified. At Waroonga, 34,102m of underground diamond drilling was completed in 2021. Infill drilling further defined the significant Kath Lower lode, which remains open down-plunge (Figure 7.2.1). Extensional and infill drilling was also completed at the Waroonga North lodes, replacing ore depleted by mining. Down-plunge extensional drilling of the Kim lode continued to return positive results. Step-out and infill drilling is planned for the Waroonga North, Kath Lower, Main South, FBH South and Kim South areas.
P a g e 41 | 138 Figure 7.2.1: Schematic long-section through Waroonga complex Note: Remnant mineralisation within 10 m of mined stopes above 9800 RL and 7 m below 9800 RL is sterilised and not reported as Resource Source: Mineral resources and Mineral reserve Supplement to Integrated Annual Report, 2021 At New Holland, 14,702m of extensional and exploration diamond drilling (surface and underground) was conducted, primarily at Hidden Secret, Sheba South and Sheba North (Figure 7.2.2), with minor drilling in the New Holland and Greater Genesis areas. The drilling at Sheba South defined a significant high-grade extension of the Sheba lode which has been used to inform the December 2021 Mineral resource. Further drilling at Sheba South, Sheba North and Hidden Secret is planned in 2022.
P a g e 42 | 138 Figure 7.2.2: Schematic long-section through New Holland complex Note: Remnant mineralisation with 7 m of mined stopes is sterilised and not reported as Resource Source: Mineral resources and Mineral reserve Supplement to Integrated Annual Report, 2021 At the Redeemer complex which includes Barren Lands, 27,175m of surface drilling was completed in 2021. Drilling included both reverse circulation (RC) and diamond drilling (DD). Barren Lands, resource conversion drilling down- plunge of the proposed Barren Lands open pit added to the underground Mineral reserve, which remains open down- plunge (Figure 7.2.3). Drilling the Redeemer North lode confirmed the geometry and thickness of the mineralisation, resulting in the reinstatement of Redeemer North as a Mineral resource.
P a g e 43 | 138 Figure 7.2.3: Schematic long-section through Redeemer complex Note: Mineralisation with 130 m of the caved area is sterilised and not reported as Resource Source: Mineral resources and Mineral reserve Supplement to Integrated Annual Report, 2021 Future exploration includes extensional drilling of Barren Lands, Redeemer North and Redeemer Zone 2 North, and testing of down-plunge extensions in all areas. The Qualified person’s opinion of the 2021 exploration and resource extension drilling is: (a) All exploration activities, including drilling, database management, validation and QA/QC, prior to incorporating relevant data into the resource modelling and estimation process, is viewed as sufficient, appropriate, technically assured and suitable to support Mineral resource estimates. 7.3 Hydrogeology Two significant aquifer systems are identified in the Agnew area. Vuggy, siliceous ultramafic aquifers developed through preferential secondary weathering of specific underlying ultramafic rocks (dunnite). Recharge to the aquifers is low and water is being removed (mined) from storage with expected high rates of abstraction (water drawn from bores). The Fairyland, EMU and New Woman borefields are developed in the siliceous ultramafic aquifer and are the principal sources of potable and process water. Fractured rock aquifers are associated with structural features such as faults, joints and shear zones, particularly in metasediments. These deep fractured rock aquifers are typical in the mines that require dewatering; the limits of which are not well defined. The deeper fractured rock aquifers appear to have little or no hydraulic connection to the overlying/adjacent silicified ultramafic aquifers. Regional groundwater surveys followed by mine-scale airlift, pumping & packer testing have established initial hydrogeological parameters, and the initial hydrogeological database and model. Pre-feasibility and Feasibility studies include targeted pumping and airlift testing, piezometer installation, enhancement of the hydrogeological database and 3D modelling, and initial assessment of depressurization and dewatering requirements.
P a g e 44 | 138 The Qualified persons opinion of the 2021 hydrology is: (a) Agnew has reliance on appropriate hydrological studies conducted at all relevant sites a) Hydrology is not viewed as presenting a material risk to Agnew or the December 2021 Mineral resource and Mineral reserve estimates. 7.4 Geotechnical A representative selection of uncut resource diamond drilling core (normally/preferably HQ size) is geotechnically logged and sampled for laboratory testing (Table 7.4.1). In addition, targeted, dedicated triple-tube geotechnical holes are required for any study and are planned by the responsible geotechnical department. Agnew guidelines for open pit studies are a minimum of one drill hole per 100 m of pit crest, or one drill hole pierce point per 4 ha of pit slope surface. Entire recovered orientated core is logged to determine representative rock mass. Guidelines for underground projects is a pierce-point density of 50 m x 50 m for non-orientated rock mass logging and 100 m x 100 m for oriented logging. The tested area is normally 100 m either side of the ore. Mine infrastructure is normally within the 100 m window. Additional testing is completed for infrastructure outside the tested area. Table 7.4.1: Representative samples for laboratory testing Type of test Samples Underground Open pit Direct shear (DST) (for weathered rock, saprolite, fault gouge, etc.) 5 per domain Uniaxial compressive strength (UCS) (with Youngs Modulus and Poisson’s ratio determination) 5 per lithology Triaxial compressive tests (GCTS) (5 suites at four confining pressures) 20 per lithology Brazilian tensile strength (UTS) 5 per lithology Acoustic emission (AE) 3 per site Source of data; Agnew CPR 2021 Where insufficient core logging data is available, line or cell mapping is conducted on surface or underground exposures The Qualified person’s opinion of the 2021 geotechnical work is: (a) Agnew has completed all appropriate testing for the current life of mine reserve and continues to test all new significant discoveries (b) Geotechnical domains and lithologies are based on core logging and modelled by the Geology department (c) Sample testing is adequate for the purposes of this report (d) The quality of the sampling and laboratory testing is adequate to support the Mineral resource and Mineral reserve estimates. All rock testing for Agnew is conducted at Nata accredited laboratories. Samples provided to the laboratories are intact samples collected directly from core which exceed the minimum length requirements and rock sample condition requirements for the various tests (DST, UCS of BTS) conducted. Each sample is protectively wrapped for transport and has all associated domain logging validated prior to use of the test results in a corresponding study or analysis. Due to varying levels of alteration and weathering within Agnew Gold Mine lithologies, the typical strength ranges from 25 MPa to 260 MPa based on UCS and UTS testing, 1.1 MPa to 31.7 MPa for BTS testing and 30 ° to 38 ° for DST (open pit only) testing. These rockmass characteristics are well understood and there are proven Geotechnical Engineering solutions in terms of ground support underground and pit slope parameters in open pit for each rock type and associated ground conditions. The principal stress is horizontal.
P a g e 45 | 138 7.5 Density Bulk density measurements are routinely completed by experienced Agnew core farm staff utilizing the water displacement method for competent non-porous rocks. The sample is air-dried and weighed to determine the dry mass (Ms). The sample is placed in a basket and weighed in water. The weight of the basket in water is subtracted to determine the weight of the sample in water (Ms in water). Dry bulk density is calculated as the mass of the sample in air divided by the difference between the mass of the sample in air and the mass of the sample in water. Oxide samples are submitted to Australian Laboratory Services (ALS) Kalgoorlie for density determination using the water displacement method after wax coating. The bulk density values by Mineral resource area are summarized in Table 7.5.1. Table 7.5.1: Key Resource models, lithology and bulk density values Resource model Lithology Density (t/m³) Claudius Cover 1.93 Duricrust 2.06 Saprolite Footwall basalt, Volcanic sediments, Hangingwall basalt 2.24 Saprolite Ultramafic 2.23 Saprolite Scotty Creek Sediments 2.55 Saprock Footwall basalt, Volcanic sediments, Hangingwall basalt 2.99 Saprock Ultramafic 2.74 Saprock Scotty Creek Sediments 2.55 Fresh Footwall basalt, Volcanic sediments, Hangingwall basalt 3.03 Fresh Ultramafic 2.87 Fresh Scotty Creek Sediments 2.67 Maria Cover/transported 2.00 Oxide conglomerate 1.70 Transitional conglomerate 2.59 Fresh conglomerate 2.81 Redeemer Zone 2 & Redeemer North Laterite / Duricrust 2.18 Silcrete / Calcrete 2.37 Upper Saprolite 1.81 Lower Saprolite 2.40 Saprock 2.65 Fresh Never Can Tell (NCT) Basalt 3.01 Fresh Mafics 3.01 Fresh Mine Corridor Conglomerate (MCC) 2.99 Fresh Porphyry 2.75 Fresh Zone 1 pebbly sandstone 2.71 Fresh Zone 2 pebbly sandstone 2.72 Fresh Zone 3 pebbly sandstone 2.75 Fresh Zone 2a pebbly sandstone 2.72 Fresh Scotty Creek Sediments 2.73 Fresh Ultramafic 2.90 Cams Oxide basalt/gabbro 2.20 Fresh basalt/gabbro 2.80 450 South Saprolite MCC 1.90 Saprock MCC 2.40 Fresh MCC 2.80 Kim Fresh MCC 2.80 FBH Fresh Scotty Creek sediments 2.81 Fresh MCC - SKcU3 – halo and non-mineralised 2.92 Fresh MCC - SKcU3 – mineralised 2.82 Fresh Edmunds Sandstone – halo and non-mineralised 2.88 Fresh Edmunds Sandstone – mineralised 2.82 Fresh MCC - SKcU2– halo and non-mineralised 2.90 Fresh MCC - SKcU2 – mineralised 2.76 Fresh MCC - SKcU1 2.95 Fresh Ultramafic 2.94
P a g e 46 | 138 Resource model Lithology Density (t/m³) Fresh Porphyry 2.82 Kath & Waroonga North Transported / Duricrust 1.66 Upper Saprolite 1.71 Lower Saprolite 2.37 Saprock 2.54 Fresh Scotty Creek 2.80 Fresh MCC - SkcU3 2.92 Fresh Edmunds Sandstone 2.89 Fresh MCC - SkcU2 2.89 Fresh MCC - SkcU1 2.96 Fresh Ultramafic 2.97 Fresh Porphyry (none) 2.66 Fresh Siliceous sandstone 2.97 Fresh Mineralised lodes excluding easterlies 2.73 Fresh Mineralised lodes easterlies 2.79 Fresh Halo 2.86 Main North Main South Rajah Fresh MCC 2.80 Lower Genesis (LGX) Fresh Scotty Creek sediments 2.70 Cinderella Saprolite Scotty Creek sediments 1.70 Saprock Scotty Creek sediments 2.60 Fresh Scotty Creek sediments 2.64 Sheba Fresh Scotty Creek Mudstone 2.73 Fresh Scotty Creek Medium/fine grained sandstone interbedded west 2.72 Fresh Scotty Creek Western coarse-grained sandstone 2.67 Fresh Scotty Creek Medium/fine grained sandstone interbedded central 2.69 Fresh Scotty Creek Eastern coarse-grained sandstone 2.68 Fresh Scotty Creek Medium/fine grained sandstone interbedded east 2.69 Upper NH & Upper Genesis Fresh Scotty Creek sandstone 2.70 GE200 Fresh Scotty Creek sandstone 2.70 Hidden Secret, Glasgow Lass, Dobra Serica & Himitsu Duricrust 1.66 Upper saprolite Scotty Creek sediments 1.71 Lower saprolite Scotty Creek sediments 2.37 Saprock Scotty Creek sediments 2.54 Fresh Scotty Creek sandstone 2.69 Leviathan North Duricrust 2.06 Upper saprolite basalt/dolerite 1.78 Lower saprolite basalt/dolerite 1.94 Saprock basalt/dolerite 2.51 Fresh basalt/dolerite 2.88 Silcrete 2.37 Barren Lands Cover/Duricrust 2.14 Upper saprolite - MCC, NCT basalt & Ultramafic Cumulate 1.74 Upper saprolite - Sandstone 1.84 Upper saprolite - Zone1 to Zone3 pebbly sandstone 1.74 Lower saprolite - MCC 2.21 Lower saprolite - NCT basalt 2.24 Lower saprolite - Ultramafic Cumulate 2.23 Lower saprolite - Sandstone 2.26 Lower saprolite - Zone1 to Zone4 pebbly sandstone 2.21 Lower saprolite - Mafic dykes 2.24 Saprock - MCC 2.56 Saprock - NCT basalt 2.99 Saprock - Ultramafic Cumulate 2.74 Saprock - Sandstone 2.52 Saprock - Zone1 to Zone4 pebbly sandstone 2.63 Saprock - Mafic dykes 2.99 Fresh - MCC 2.96 Fresh - NCT basalt 3.03 Fresh - Ultramafic Cumulate 2.92
P a g e 47 | 138 Resource model Lithology Density (t/m³) Fresh - Redeemer basalt 2.96 Fresh - Sandstone 2.74 Fresh - Zone1 to Zone4 pebbly sandstone 2.72 Fresh - Mafic dyke 1 2.94 Fresh - Mafic dyke 2 3.04 Silcrete lower 2.37 Silcrete upper 2.37 Source of data; Agnew CPR 2021 The Qualified person’s opinion of the density work is: (a) The bulk density testing is adequate for the intended purpose and the tonnage estimation based on the bulk densities appear to have little bias b) Bulk densities are consistent with lithology and ore types estimated over a ±25-year mining history
P a g e 48 | 138 8 Sample preparation, analyses, and security 8.1 Sample preparation Sample types taken at Agnew include: Diamond core drilling: samples are marked up with a maximum core length of 1 m, depending on the core size. Where possible the core is cut in half with one half submitted for analysis. Core is whole sampled if it cannot be cut (e.g. underground resource definition and grade control holes). Reverse circulation: the whole sample is recovered through a cyclone attached to the drill rig and reduced to around 3 kg using a Metzke fixed cone splitter. A split duplicate sample is also collected for comparison. Samples are recorded as ‘dry’, ‘damp’ or ‘wet’. Where the drill operator is unable to lift the air from the hole in order to keep the sample dry for approximately 4 to 6 m, the hole is ended. Aircore: the whole sample is recovered through a cyclone attached to the drill rig and reduced using a Metzke fixed cone splitter. A split duplicate sample is also collected. In wet horizons, the total sample is collected and manually sub-sampled utilizing the fractional scooping technique. Most of this work is completed at the laboratory where the sample is dried, homogenised, split and analyzed. Wet sample cyclone preparation causes a high sample duplicate bias, whereas adapting to the fractional scooping technique improves duplicate sample bias in wet sample preparation. Each hole drilled is assigned a unique hole identification number and is uploaded to the database with all appropriate associated metadata (e.g., spatial location, hole type, depth etc). Each sample collected is issued with a unique sample number along with a depth interval. The recoveries and collection dates are recorded against each of the samples. A series of written standard procedures exist for sampling and core cutting at Agnew. Periodic routine visits to drill rigs and the core farm are carried out by project geologists and senior geologists/superintendents to review core logging and sampling practices. These are also supported by quarterly routine Sarbanes-Oxley (SOX) control procedure walkthroughs and reviews. All recent diamond drill core is retained in the core farm and reverse circulation and aircore chips are stored in labelled compartment trays for future reference. For samples processed at the assay laboratory: A 250 to 300 gram pulp residue (fire-assay) or 450 to 500 gram jar (Photon Assay) is held for up to three months then returned to Agnew. Bulk residues are retained for three months then returned to site or discarded depending on project requirements. Security is not a significant issue at Agnew as it is a remote site and the number of outside visitors is low. A security gate and swipe card system exists to account for all mine personnel and numerous security video cameras placed around the site. Deposits known to contain visible gold renders the drill core susceptible to theft, however, the risk of sample tampering is considered low. Agnew organizes transport companies to collect bagged samples from a secured locality at the Property. These are then transported to the laboratory facility for further preparation and assaying. All samples received by the laboratory are physically checked against the dispatch order and Agnew is notified of any discrepancies prior to sample preparation commencing. No Company personnel are involved in the preparation or analysis process. The Qualified person has reviewed the sample preparation and security procedures. The sample preparation is found to be adequate with effective supervision and in line with industry leading standards. No material bias is indicated that could potentially impact the sampling preparation and analysis. Sample security enforcement is reliable with low consequence if in the unlikely event of security protocols failure.
P a g e 49 | 138 8.2 Sample analysis In 2021 Agnew changed from using the traditional fire-assay analysis method for gold to the PhotonAassay analysis method. The PhotonAssay method involves exposure of samples with high energy X-rays causing excitation of atomic nuclei with resulting production and decay of a gold isomer. Gamma rays emitted from the isomer decay are detected and the atoms of gold in the sample can be counted. PhotonAssay is highly accurate, chemical-free and completely non-destructive of the sample. A 450 – 500 g single-use jar allows for bulk analysis with no chance of cross contamination between sample. The Agnew gold deposits are structurally controlled, vein-hosted hydrothermal ore deposits containing coarse gold. Obtaining representative samples from a coarse gold deposit is challenging, and sampling theory suggests larger samples be taken to achieve this. Traditional fire-assay requires sub-sampling via crushing and splitting to obtain a 50 g sub-sample for analysis. PhotonAssay provides a practical solution to rapidly obtain an accurate gold assay using a significantly larger sample size of up to 500 g (approximately, density dependent). The larger sample mass reduces sampling errors and improves precision. Additional benefits are simpler sample preparation, faster assay turnaround and the ability to carry out repeat analysis as the sample is not destroyed by the process. Primary assaying of diamond core drilling, reverse circulation and aircore samples is undertaken by MinAnalytical (MinA) Kalgoorlie (PhotonAssay) and Australian Laboratory Services (ALS) Kalgoorlie and Perth (fire-assay). Fire assay is the assaying technique which is industry standard process for obtaining gold concentrations from samples. The majority of grade control, resource definition and exploration samples collected at Agnew in 2021 were analyzed using PhotonAssay (66 %), with samples submitted for fire-assay (30 %), and multielement analysis (4 %). Table 8.2.1: Analytical laboratory accreditation Analytical laboratory accreditation Laboratory Certificate number Accreditation number MinAnalytical (MinA) Kalgoorlie 18876 ,21075 (ISO/IEC 17025) Australian Laboratory Services (ALS) Kalgoorlie QEC27912, C-90494 (ISO 9001:2015) Australian Laboratory Services (ALS) Perth 825, 23001 (ISO/IEC 17025) The Qualified person has reviewed the certificates and is of the opinion that the analytical laboratories are certificated and have effective process and protocol in place to ensure quality control and assurance and minimize any material errors. 8.2.1 PhotonAssay Samples transported to MinA Kalgoorlie for PhotonAssay undergo crushing and sub-sampling through the MinA automated sample preparation facility or manual sample preparation. This comprises a single stage coarse and fine crush using a Boyd crusher to 2-3 mm. Approximately 450-500 g sub-sample is obtained via a riffle splitter and deposited into a PhotonAssay jar. The jars are passed through the automated PA1408X (‘MAX’) system for analysis. The standard PhotonAssay setting within the MAX system has a gold detection limit of 0.03 ppm – 350 ppm. Samples that exceed > 350 ppm trigger a re-assay at a higher energy setting for which the system is recalibrated and samples re-assayed at the end of shift. Rejects are retained at the lab for 3 months, then returned to site, these are discarded or retained depending on the project requirements.
P a g e 50 | 138 Figure 8.2.1: Sample flowchart for MinAnalytical Source: Agnew CPR 2021 8.2.2 Fire-assay Following arrival in Kalgoorlie or Perth and checking against the accompanying documentation, the samples are sorted, weighed and sample numbers entered into the Laboratory Information Management System (LIMS). Bar-coded sample labels and work sheets are used to control workflow through the sample preparation and analytical phases. The samples in their respective calico bags are dried at 105 ºC in a gas forced oven followed by: Jaw crushing of drill core to -15 mm. Boyd crusher to 90 % pass <3 mm. Riffle split to <3 kg and pulverizing in a LM5 mill. 250 – 300 g pulp sub-sample taken for analysis. Remainder of pulp returned to original calico sample bag. The pulverized sub-sample is placed in a labelled paper sample bag for analysis. Analysis is by 50 g fire-assay with an atomic absorption spectrometry (AAS) finish. Gold assay values of >60 g/t Au undergo gravimetric analysis.
P a g e 51 | 138 Figure 8.2.2: Sample flowchart for ALS Source: Agnew CPR 2021 All laboratories processing Agnew samples are required to have separate sample preparation and analysis circuits for mine grade control samples and exploration samples to minimize cross contamination. The pulps are packaged in water resistant sample bags clearly marked with the sample number and Agnew number (and barcode if available). Sample envelopes are securely packaged in stackable boxes. Given the occurrence of some
P a g e 52 | 138 high grades, screen fire assays checks are undertaken, but this occurs for <1 % of the samples. The laboratories used are listed in Table 8.2.1. 8.3 Quality control and quality assurance (QA/QC) To monitor QA/QC, Agnew has implemented a comprehensive “Best Practice” QC system, comprising written procedures and monitoring by geology group, together with internal and external audits. The QA/QC procedures, audits, round-robin benchmarking, as well as the submission of blanks and standards are specified, and full documentation is kept on site at Agnew. QC samples are submitted within laboratory batches allowing monitoring of the drilling, sampling, laboratory sample preparation techniques as well as analytical accuracy and precision. The different types of QC samples are summarized in Table 8.3.1. Table 8.3.1: Quality control sample types Sample description QC stage Comments Field duplicate Monitors sample source and sampling procedure Duplicate sample taken identically as the original sample (half core; reverse circulation duplicate split taken in field) Laboratory duplicate Preparation Repeats taken by ALS to monitor the laboratory process Coarse crush duplicate Preparation after jaw crush, but before pulverized Implemented in 2019 to ensure that whole diamond core samples can get a representative duplicate Standard/blank Analytical Certified sample of known concentration: pulps (standards), coarse crushed matrix-matched basalt (blank) Pulp re-assay Analytical Repeated re-assay on the analytical pulp as requested by the QA/QC geologist from a QC failure or as a lab check Pulp umpire Analytical (at the end of a programme) Random subset of pulps sent to an umpire laboratory to ensure analytical accuracy and precision Source: Agnew CPR, 2021 Blanks and field duplicate samples are inserted at an average frequency of 1 in 20. Low-grade, medium-grade and high-grade certified reference materials (standards) are inserted at relevant locations within intersections at a minimum frequency of 1 in 20. All sampling and quality management is supervised by the geologist responsible for the drilling programme and may supplement the QA/QC sampling as required. Quartz washes (barren material) are also inserted between extremely high-grade areas to prevent any carry over from the laboratory sample preparation procedure. For diamond core drilling, field duplicates were previously taken by cutting the retained half core into quarter core. This practice was replaced by a crush duplicate of the primary half core sample. Crush duplicates and pulp duplicates are taken from the original sample and re-assayed by the primary laboratory. The rate of insertion for crush and pulp duplicates is 1 in 20. ALS and MinA routinely run a minimum of one blank and three standards with each sample batch. These results and long-term results are available at any time on request. Each laboratory batch is analysed on receipt to determine accuracy, precision and repeatability of each assay. All assay results are received directly from the laboratory and automatically loaded into the database using scheduled automated database tasks. The results are subjected to an automated process where the QA/QC samples are evaluated and either passed or failed. A digital certified assay certificate is backed up on the Agnew server on a regular schedule. Assay results outside a standard set of control guidelines are flagged automatically and a warning notification is sent to the responsible geologist. If a batch fails, it is quarantined in the database until the geologist has examined the data and determined any course of action required in conjunction with the geology group. Data analyzed includes sample size (weight) and, standard and blank performance, with monthly summaries presented to the geology staff.
P a g e 53 | 138 Periodic QA/QC reports evaluates all assay data received and reports on the accuracy, precision and overall quality of the data. Additional reports are prepared by the project geologist for individual projects. All geologists receive training in QA/QC and the use of acQuire® to evaluate data. The geologists are expected to actively monitor and maintain the quality of the data they are producing. Agnew provides the geologist with the minimum frequency of QC samples to be inserted into sampling programmes via macros in the sample registers. QC data is monitored continuously by senior geologists and by the project geologist during drilling, with the senior geologists and/or regional database group provided a summary report of the data on a periodic basis. Data collection and storage is subject to internal system and staff-based audits, SOX controls and audits, round robin laboratory analysis and QA/QC reference material usage. No systematic long term sample biases have been identified from the QA/QC programme for the drilling carried out at Agnew which demonstrates sufficient accuracy and precision for use in the estimating of Mineral resources. Secondary check assay analysis (umpire sampling) was recently carried out for 82 samples for fire-assays. Pulverized duplicate samples were submitted to an umpire laboratory (Genalysis) for secondary quality analysis. No systematic sample bias is identified from the QA/QC programme. Umpire checks have not yet commenced for PhotonAssays.
P a g e 54 | 138 9 Data verification The execution of mine and regional exploration programmes is completed to industry best practice and is aligned with numerous standards and procedures developed by Agnew and Gold Fields over many years. The process consists of procedures, audits and sign-off documents for all key elements that input into the generation of a Mineral resource model to ensure full compliance. The key components of the geological data acquisition framework include: Validity – Controls to ensure the validity of key activities. Accuracy – Controls to establish the accuracy of data inputs and outputs. Completeness – Controls to ensure the completeness of the process followed. Timing – Preventative and detective controls to identify potential risk and deviation of quality. Segregation of Duties/Sign-off – Key members of the senior team are responsible for different aspects of the process. Describe data verification procedures including: Any limitations on or failure to conduct such verification, and the reasons for any such limitations or failure; and The Qualified person's opinion on the adequacy of the data for the purposes used in the technical report summary The Qualified person is of the opinion that the data verification process and protocols are adequate to minimize any material errors, are in line with industry leading standards and underpin technical assurance. 9.1 Data management All data at Agnew is stored in a Sequel database (SQL) relational database format using a proprietary front-end software interface (acQuire®), which enables definition of tasks, permission management and database integrity. The Sequel database is configured for optimal validation through constraints, library tables, triggers and stored procedures. Data that fails the import rules are rejected or stored in buffer tables until corrected. This meets industry best practice and SOX requirements. The database is located on a dedicated server under the control of Gold Fields Australia Information Technology Department. Security and disaster recovery protocols are in place and follow corporate guidelines under the direction of the Information Technology Department. Daily server backups of the acQuire® database are also carried out. A major initiative in 2016 was a systematic merge of multiple historical and off-site databases into a single validated and consistent site database. This work was managed by the centralized database team and utilized external database specialists to validate, review, error check and ultimately merge all ancillary databases into the main standardized acQuire® site database with standardized lithological codes. This was completed in December 2016 with on-going validation and reviews to ensure overall data integrity. While some customization of the various databases has occurred since acQuire® was adopted, a common structure and set of tools is now maintained and periodically updated when required by the geological database team to ensure standardization, data integrity and adaptation for new geological inputs and data (e.g., hyperspectral data which is now routinely added). All exploration data control is managed centrally, from drill hole planning to final assay, survey and geological capture. Most logging data (lithology, alteration, and structural characteristics of core and percussion chips) is captured directly either by manual or to customized digital logging tools with stringent validation and data entry constraints. Geologists load data via buffer tables where initial validation of the data occurs. The data are uploaded into the database by the geologist after which an additional automated validation process is conducted on the data and the geologist is notified of any issue. The issue must be addressed, or the data is not loaded into the database.
P a g e 55 | 138 Data validation is controlled via rules, library tables, triggers and stored procedures. A validation extension in acQuire® runs queries against the database, which includes checks for incorrect collar locations and overlapping, missing or incorrect down-hole surveys. Procedures and templates are available for all geological data. Verification of data contained in this database lies principally with the geologist who logged the drill holes, and with the mine and project geologists who confirm assay and survey entries to source certificates and validate the data entered into the database. The logger has the responsibility to examine final output and investigate and explain any non- compliances. Visual validation on screen and on paper sections and plans is also routinely done prior to declaring the drill hole validated. Confirmation is required that all data imported into the database was validated by the database administrator and the programme geologists. Confirmation is also required that validation of all data occurred prior to being imported into the final database tables. Only accepted results are used in resource estimation. Any primary results failing the QA/QC standards are rejected, re-assayed and re-imported for the programme geologist to approve. Limited data is used from non-Agnew sources. Where this data is used it is acknowledged and identified in the appropriate reports. Standard practice is to convert such data to Agnew standards and import into the database upon data validation and checks. The Qualified person’s opinion of the data management is: (a) The data management process and protocols are adequate to minimize any material errors. a) Regular validation of the database and data management process is aligned with standard industry practices, verified to GFA SOX measure quarterly as a minimum 9.2 Plant Sampling Daily composite samples of process plant feed and tailings streams are taken to assist with on-site gold accounting and reconciliation. These samples are collected using a combination of automatic sampling stations as well as manual cuts using appropriately designed samplers. The analysis of the samples used for accounting purposes is conducted by ALS at its Kalgoorlie laboratory. Solid sample composites are analyzed using fire assay with an AAS finish. Carbon sample composites are analyzed using high temperature ashing, acid digest and an AAS finish. Solution sample composites are analyzed using DIBK extraction and an AAS finish. All laboratory assaying procedures are aligned with standard industry practices. In accordance with Gold Fields Plant Metal Accounting Standard, a gold in circuit survey is undertaken monthly to reconcile (by mass balance) the back-calculated gold grade of the mill feed with the mill feed grade estimates obtained using plant samples and assays. The monthly variance between the assayed grade and the back-calculated grade is monitored, and an investigation is required to be carried out if this variance exceeds the minimum allowable levels outlined in the Gold Fields Plant Metal Accounting Standard. 9.3 Drilling Drillhole data validation is completed using Datamine® or Leapfrog® software including checks for unique collar locations, overlapping intervals, excessive down hole deviation, and matching total drill depth within all tables. Errors are reviewed and either corrected or the hole is flagged and excluded from use in the estimation. All issues identified are corrected in the acQuire®database. Where multiple drilling techniques are used in a resource estimate (DD and RC), a comparison of the data within a common volume is carried out. If potential biases are noted, these are investigated to establish potential reasons and actions. Where drilling data is historic, available QAQC data is assessed. Where historic drilling data lacks QAQC, a comparison of recent and historic drilling may be made to assess data quality and suitability for use. A decision may be made to include or exclude the poorer quality data and to apply an appropriate resource classification.
P a g e 56 | 138 In the case where the quality of historic drilling is in doubt, further drilling may be carried out to twin drillholes and gather QAQC data. Where underground face samples are used in resource estimates these are routinely compared to DD within a common volume and lode. The face data for some deposits displays biases compared with DD. Reasons considered for the bias may be: poorer quality sample for the face samples resulting from sampling selection bias, and: face sample volume is much greater than the diamond sample volume, therefore may be more representative sample than DD in a high nugget environment. Reconciliation data suggests the face samples may be more representative than the DD samples in Agnew’s high nugget gold deposits. The use of face samples in the resource estimates is limited to the area immediately surrounding underground development. The Qualified person is of the opinion that the drilling protocols described in this report are adequate to minimize material errors and provide the necessary technical assurance. 9.4 Sampling Core cutting sheets are generated in acQuire®, and once populated during the logging and sampling process, are re- imported. Some data, such as core logging and underground development face sampling, is entered or edited manually into the acQuire® database table forms or data entry objects. A unique sample dispatch is generated in acQuire® and emailed to the laboratory. Returned assays from the laboratory are linked to this dispatch and are emailed as a SIF file. These files include detailed information about the batch, methods, units, detection limits and elements assayed. The file also includes all QC data in the sequence of analysis. The Qualified person is of the opinion that the sampling protocols are adequate to minimize material errors and the analytical procedures reflect industry standard practice or better and are appropriate for resource estimation. 9.5 Survey Additional drill hole validation is completed using Datamine® or Leapfrog® software. This validation checks for unique collar locations, overlapping intervals, excessive down hole deviation, and matching total drill depth within all tables. Errors are reviewed and either corrected or flagged and excluded from use in the estimation. All issues identified are corrected in the acQuire® database. The Qualified person is of the opinion that the survey protocols are adequate to minimize material errors. 9.6 Sample analysis The GFA QAQC procedure is reviewed every two years. Assay certificate verification and assay laboratory audits are completed as per GFA SOX requirements minimum on a Quarterly review. The Qualified person is of the opinion that the sample analysis protocols are adequate to minimize material errors. 9.7 Geological modelling Geological interpretation has the potential to impact materially on the estimated quantity and quality of a Mineral resource and Mineral reserve and assumptions regarding volume and geological and/or grade continuity are important to support the correct estimate of contained metal. Support from expert geologists, site and corporate peer reviews, external reviews, and the Model Change Authorisation (MCA) process ensure that the geological interpretation is one that would be universally supported and independently arrived at. The Qualified person’s opinion of the geological modelling is: (a) The geological modeling protocols are adequate to minimize material errors
P a g e 57 | 138 a) The controls have been reviewed and the adequacy is reasonable and that material bias or errors are unexpected b) The systems to reduce human and procedural errors, checks and balances are adequate and minimize material errors c) The protocols are adequate as reviewed and that the Mineral resource models are based on sound data and are reasonable
P a g e 58 | 138 10 Mineral processing and metallurgical testing 10.1 Testing and procedures The Agnew operation currently comprises of two operating underground mining complexes (Waroonga and New Holland), and multiple potential future open pits and underground mines. Routine metallurgical recovery testwork is undertaken on core samples selected from projects representing potentially prospective Mineral reserves. Upon definition of discrete geological domains or lithologies, individual composite samples of diamond drill core are selected and collected by the relevant geologist for subsequent laboratory-scale metallurgical response testwork. Samples are typically composited from diamond core drilling to obtain single continuous mineralized intercepts (including expected internal and external ore dilution) from a known single spatial location, typically (and more recently) representing single geological domains or lithologies. The number of samples selected per potential ore mining source is approximately based upon the nature (size and geological homogeneity) of the orebody, the study stage (i.e., scoping, pre-feasibility or feasibility), and the variability of the metallurgical recovery response, when known. Agnew follows the Gold Fields Australia Metallurgy Testwork Sampling Guideline which sets out the minimum requirements for testing process and protocol. The core samples are dispatched to an independent third-party laboratory for testing, currently ALS Metallurgy, Balcatta, Western Australia, which is an industry accredited quality assured laboratory. The Gold Fields standard testwork protocol is designed to reasonably reflect the performance of the existing process plant and typically includes: (a) Head analysis multi-elemental scans (including Au (gold), Ag (silver), Cu (copper), As (arsenic), C-suite (carbon), S-suite (sulphur), Hg (mercury), Sb (antimony), Te (tellurium) and quantified x-ray diffraction (QXRD) analyses. d) Acid mine drainage (AMD) analysis, being Total S, Acid Neutralisation Capacity (ANC), Net Acid Generation (NAG), Total Acid Production Potential (TAPP), Net Acid Production Potential (NAPP), Net Acid Generation (NAG), and pH. e) Comminution characteristics including crushing work index, abrasion index (Ai), Bond BWI and SMC SAG milling parameters. f) Gravity recovery estimation by laboratory Knelson recovery, followed by mercury amalgamation of concentrate. g) Leaching profile of gravity/amalgam tails, including leaching profile of Au, Ag, Cu, pH, dissolved oxygen (DO), and free cyanide. h) Multi-elemental Inductively coupled plasma mass spectrometry (ICP) scans of final leach solution. i) Leach solids residue analysis for Au, Ag and Cu. j) Diagnostic analysis of tailings residue if warranted. Metallurgical testwork programmes are ongoing at Agnew, based upon progressive drilling and the definition of new or existing mining area extensions that are associated with the exploration programmes. Recent metallurgical programmes included testwork carried out on core samples taken from potential mining areas at Redeemer North, Barren Lands Underground and Hidden Secret. For extensions to currently mined projects or the re-establishment of former mines, existing testwork is reviewed for sample representation across the remaining orebody. 10.2 Relevant results 10.2.1 Sample Head Analyses Table 10.2.1 shows a summary of the average sample head analyses for the Waroonga underground mine grouped by mining area. The underground ore samples are reasonably enriched in arsenic (As), sulphide sulphur (S sulphide), nickel (Ni), calcium (Ca), aluminium (Al), and magnesium (Mg) and contain relatively low concentrations of organic carbon (C organic), cadmium (Cd), and mercury (Hg).
P a g e 59 | 138 Table 10.2.1: Summary of Waroonga underground mine areas average sample head analyses Species UOM Kim / Edmunds FBH Main Rajah Waroonga North Kath Sample Count No. 5 9 4 2 11 13 Au ppm 9.50 8.59 8.52 6.57 14.24 12.73 Ag ppm 0.49 1.09 0.53 0.38 1.49 1.44 As ppm 8272 6647 4900 8600 3139 7078 Al % 1.88 3.74 2.56 6.00 2.64 3.79 Ba ppm 32 134 70 380 36 156 Be ppm < 20 < 20 < 20 < 20 < 20 < 20 Bi ppm <10 <10 22 <10 <10 10 C total % 0.06 0.15 NA NA 0.13 0.10 C organic % 0.06 0.04 NA NA 0.03 0.02 Ca % 1.68 3.88 3.69 3.68 2.78 3.17 Cd ppm < 20 < 20 < 20 < 20 < 20 < 20 Co ppm 22 43 65 40 37 43 Cr ppm 435 1400 1794 900 1132 1231 Cu ppm 12 61 71 78 75 94 Fe % 2.26 4.64 5.57 5.82 4.10 4.68 Hg ppm 0.08 0.06 0.09 0.08 0.06 0.05 K % 0.07 0.24 0.13 0.23 0.06 0.22 Li ppm 17 22 18 20 14 23 Mg % 2.54 6.92 8.54 6.30 6.09 6.47 Mn ppm 365 753 925 950 633 676 Mo ppm < 5 < 5 < 5 < 5 < 20 < 5 Na % 0.79 0.62 0.21 2.66 0.27 0.78 Ni ppm 197 487 770 470 509 516 P ppm 270 258 219 313 < 250 296 Pb ppm 44 33 18 45 20 262 S total % 0.40 0.58 0.39 0.48 0.21 0.43 S sulphide % 0.21 0.48 0.35 0.46 0.16 0.37 Sb ppm 2.38 2.82 2.88 5.55 2.61 5.62 Sr ppm 127 197 61 208 81 125 Te ppm 0.6 1.1 1.7 0.7 0.2 1.3 Ti ppm 860 2067 1900 2800 1291 1785 V ppm 31 79 71 95 60 86 Y ppm < 100 < 100 < 100 < 100 < 100 < 100 Zn ppm 28 67 48 75 45 51 Source: Agnew CPR 2021
P a g e 60 | 138 Table 10.2.2 shows a summary of the average sample head analyses for the other Agnew underground mines, New Holland-Sheba, Redeemer and Barren Lands. Observations of these underground ore sample results, potentially relevant to mineral processing, include the following: New Holland - Sheba – relatively enriched in arsenic (As) Redeemer Zone 2 – relatively enriched in arsenic (As), with some tellurium (Te) Redeemer North – relatively enriched in nickel (Ni), and lead (Pb) Barren Lands - – relatively enriched in arsenic (As), nickel (Ni) and antimony (Sb)
P a g e 61 | 138 Table 10.2.2: Summary of Agnew underground mine areas average sample head analyses Species UOM New Holland Sheba Redeemer Zone 2 Redeemer North Barren Lands Sulphide Sample Count No. 3 10 12 12 Au ppm 8.57 6.53 5.94 8.81 Ag ppm 0.60 0.83 < 0.3 1.01 As ppm 3267 8016 20 5703 Al % 3.56 5.12 4.36 6.57 Ba ppm 873 638 74 320 Be ppm < 20 < 20 < 20 < 20 Bi ppm <10 <10 <10 14 C total % 0.18 0.23 0.80 0.93 C organic % 0.04 0.02 0.02 0.02 Ca % 0.53 1.38 7.04 5.14 Cd ppm < 20 < 20 < 20 < 20 Co ppm 10 13 90 28 Cr ppm 58 301 2050 448 Cu ppm 12 46 64 50 Fe % 0.91 1.96 8.00 4.30 Hg ppm 0.15 0.05 0.10 0.35 K % 1.27 0.52 0.76 0.65 Li ppm 10 10 37 18 Mg % 0.37 1.32 11.32 3.40 Mn ppm 120 310 1100 871 Mo ppm < 5 < 5 < 20 < 5 Na % 1.58 3.06 0.44 2.71 Ni ppm 60 102 713 229 P ppm 292 205 179 442 Pb ppm 53 46 < 5 47 S total % 0.17 0.50 0.02 0.34 S sulphide % 0.14 0.44 0.01 0.28 Sb ppm 1.30 2.99 0.73 5.26 Sr ppm 178 174 162 369 Te ppm 0.2 1.4 0.2 0.2 Ti ppm 733 1380 2550 2600 V ppm 16 44 155 79 Y ppm < 100 < 100 < 100 < 100 Zn ppm 38 25 42 70 Source: Agnew CPR 2021
P a g e 62 | 138 Table 10.2.3 shows a summary of the average head grade analyses for the various Agnew’s open pits. Observations of the open pit’s ore sample results, potentially relevant to mineral processing, include the following: (a) Barren Lands (oxide) – relatively enriched in nickel (Ni) and zinc (Zn), slight enrichment in mercury (Hg) a) Claudius – relatively enriched in nickel (Ni), copper (Cu) and tellurium (Te) b) 450 South – relatively enriched in in nickel (Ni) and zinc (Zn) c) Leviathan North - relatively enriched in zinc (Zn) d) Hidden Secret - relatively enriched in arsenic (As) and silver (Ag) e) Glasgow Lass - relatively enriched in arsenic (As) and copper (Cu) f) Maria – relatively enriched in copper (Cu), nickel (Ni) and zinc (Zn)
P a g e 63 | 138 Table 10.2.3: Summary of Agnew open pit mine areas: average sample head analyses Species UOM Barren Lands Oxide Redeemer Oxide Claudius 450 South Leviathan North Hidden Secret Glasgow Lass Maria Sample Count No. 7 3 5 5 7 4 5 5 Au ppm 5.66 2.12 3.47 8.31 3.78 5.98 13.75 12.36 Ag ppm 0.56 <2 0.54 < 5 0.62 2.03 1.01 0.66 As ppm 416 6 27 700 451 3638 1838 8 Al % 6.97 0.05 6.57 4.72 4.80 5.24 5.90 0.37 Ba ppm 368 802 119 118 66 929 1104 284 Be ppm < 20 < 20 < 20 < 20 < 20 < 20 < 20 < 20 Bi ppm <10 <10 16 <10 <10 <10 <10 <10 C total % 0.03 0.02 0.31 2.02 NA 0.33 0.15 0.10 C organic % 0.03 0.02 0.03 0.02 NA 0.02 0.04 0.06 Ca % 1.15 0.90 5.42 4.04 7.03 1.00 0.55 0.95 Cd ppm < 20 < 20 < 20 < 20 < 20 < 20 < 20 < 20 Co ppm 28 27 74 68 43 5 30 46 Cr ppm 320 800 482 2480 352 133 62 198 Cu ppm 57 57 166 66 103 14 101 131 Fe % 5.03 2.75 9.45 7.04 9.32 1.33 1.28 6.06 Hg ppm 0.12 0.15 0.06 0.06 0.05 0.14 0.13 0.23 K % 0.59 0.73 0.45 0.22 0.36 1.79 1.96 1.44 Li ppm 18 12 45 18 19 9 9 22 Mg % 2.30 1.52 3.86 11.83 5.21 0.61 0.49 1.94 Mn ppm 762 567 1340 1100 514 194 183 1235 Mo ppm < 5 < 5 < 20 < 20 < 5 < 5 < 20 < 5 Na % 2.99 2.62 1.28 1.12 0.09 2.54 2.33 0.50 Ni ppm 285 142 233 920 129 38 67 194 P ppm 500 367 420 325 < 250 188 290 170 Pb ppm 39 43 16 24 22 54 60 93 S total % < 0.02 0.03 0.11 0.27 0.02 0.34 0.10 0.46 S sulphide % < 0.02 < 0.02 0.09 0.17 0.02 0.25 0.06 0.32 Sb ppm 1.73 1.37 1.48 1.84 0.43 1.50 1.52 4.50 Sr ppm 233 195 104 150 51 253 242 79 Te ppm 0.2 0.5 1.8 < 0.2 0.1 0.5 0.1 0.2 Ti ppm 2857 2000 7000 2400 3771 1000 1000 4480 V ppm 82 106 259 110 103 23 23 178 Y ppm < 100 < 100 < 100 < 100 < 100 < 100 < 100 < 100 Zn ppm 87 39 74 112 114 36 28 106 Source: Agnew CPR 2021 10.2.2 Metallurgical recovery A summary of the number and results of laboratory recovery tests carried out on samples taken from key selected mining areas is shown in Table 10.2.4. Table 10.2.4: Summary of metallurgical test quantities and recovery results for key mineralisation areas Mineral reserve area Metallurgical samples (1) Average grade of samples (2) Average gravity recovery Average total gold recovery (3) Lowest total gold recovery Highest total gold recovery (No.) (Au g/t) (%Au) (%Au) (%Au) (%Au) Underground Waroonga-Kim and Edmunds 16 9.48 75.4 94.6 85.7 98.8 Waroonga-FBH 13 6.99 71.3 92.9 78.2 98.3 Waroonga-Main, Main South, Rajah 8 4.38 44.0 85.5 74.3 99.1 Waroonga-North 7 11.05 71.6 97.4 88.2 98.9 Waroonga-Kath 13 13.20 54.4 94.1 69.0 98.4
P a g e 64 | 138 Mineral reserve area Metallurgical samples (1) Average grade of samples (2) Average gravity recovery Average total gold recovery (3) Lowest total gold recovery Highest total gold recovery (No.) (Au g/t) (%Au) (%Au) (%Au) (%Au) New Holland-Sheba 2 2.37 82.7 97.9 92.9 98.4 Barren Lands 10 8.16 64.6 95.3 85.8 97.6 Redeemer (Zone 2 & North) 24 7.28 47.5 93.2 73.1 98.7 Open Pit Barren Lands 7 7.16 28.1 97.3 96.7 99.4 Claudius/Cox 5 3.50 20.7 93.7 71.9 98.9 450 South 5 6.34 68.4 97.7 92.9 98.9 Leviathan North 7 3.74 38.7 97.7 91.4 99.6 Hidden Secret/Glasgow Lass 10 11.05 67.8 95.7 90.6 99.2 Notes: 1. For samples where multiple tests carried out at different conditions on a single sample, the result used for this table was selected for conditions considered to most closely match the performance of the plant 2. Grade reported is the back-calculated grade of the sample, based on gold mass balance 3. This recovery reported is for information and comparative purposes only and is not used for reserves calculations. Reserves are instead calculated on the basis of the determined grade-recovery model Source: Agnew CPR 2021 The ore sources are typically sufficiently different in character such that, where appropriate, a fixed or grade recovery model per ore source is assigned based upon the available testwork results. For some ore sources, an overall grade- recovery relationship based on known historical process plant performance is assigned (e.g., New Holland underground). Table 10.2.5 summarizes the plant recovery estimation models for the various gold ore sources (current and future potential ore source) as derived from either metallurgical testwork results or historical plant operating experience. The model recovery outputs obtained from these equations are further constrained to be within the minimum or maximum recovery values as shown in Table 10.2.5. Table 10.2.5: Summary of the 2021 plant gold recovery estimation models for Agnew Minimum Maximum Metallurgical Recovery Formula Undergrounds Waroonga Kim 90.0 % 96.0 % Rec = (Au - (0.06722 * Au^ 0.85974) ) / Au Main 70.0 % 96.0 % Rec = 0.750765 * Au^ 0.09206 Rajah 70.0 % 85.0 % Rec = (Au - (0.33676 * Au^ 0.6702) ) / Au North 88.0 % 98.0 % Rec = 0.891292 * Au^ 0.0326 Kath Lower 85.0 % 96.0 % Rec = (Au - (0.08985 * Au^ 0.81841) ) / Au New Holland Genesis Rec = 96.0 % Sheba 90.0 % 96.0 % Rec = 0.93809 * Au^ 0.03251 Redeemer Zone 2 85.0 % 94.0 % Rec = (Au - (0.18037 * Au^ 0.56699) ) / Au North - RN1 C1/C3 Rec = 94.3 % North - RN1 C2 Rec = 84.7 % North - RN2 Rec = 97.0 % Barren Lands U/G 70.0 % 96.0 % Rec = 0.881317 * Au^ 0.03342 Open Pits Maria 90.0 % 98.0 % Rec = (Au - (0.01651 * Au^ 0.94126) ) / Au 450 South 90.0 % 96.0 % Rec = (Au - (0.0277 * Au^ 0.80205) ) / Au Barren Lands Rec = 96.0 % Glasgow Lass 90.0 % 96.0 % Rec = 0.943497 * Au^ 0.015469 Notes: a) These recovery formulas are used in the life of mine Mineral reserve and techno-economic model b) The resource recovery is included in Table 11.2.1 c) The reserve recovery is included in Table 12.3.1 Original source: Agnew AGM 2021 Cut-off Grade – Underground & Open Pits [C2022 Planning] with some subsequent amendments made The recent performance of the Agnew process plant is provided in Table 12.2.1 for comparison. The processing recovery for underground ore sourced from the Waroonga and New Holland mining areas was 95.0 % in 2021, 94.6 % in 2020 and 94.2 % in 2019.
P a g e 65 | 138 10.2.3 Ore hardness The metallurgical testing programme at Agnew includes ore hardness testing, typically being the crushing work index, abrasion index (Ai), Bond BWI (ball work index) and SMC (Steve Morrell Consulting) SAG milling parameters. To estimate mill throughput expectations for future ores from the hardness test results, the Morrell Total Power method is used, which provides an estimate of overall grinding circuit power requirement in kWhr/t using the Steve Morrell Consulting parameters (SAG mill, Mia and Ball mill, Mib) which are calculated from the Bond ball work index (BWI) test and the SMC drop weight index test results. To provide a link to the mill feed schedule the test results are grouped by ore source, also considering the distinction between oxide and fresh ores which have relatively different hardness properties. The grouped ore hardness indices and total milling power draw requirement estimates are shown in Table 10.2.6 for a final grind size of 80% passing 125 um, listed in order of increasing estimate of power draw. Table 10.2.6: Summary of rock hardness indices and mill power requirement estimates for Agnew Ore Source Mine type Oxidation state Rock SG SAG index, Mia Ball index, Mib Mill power required motor (t/m³) (kWhr/t) (kWhr/t) (kWhr/t) Open Pits - Mixed Open Pit Oxide 2.65 11.9 10.0 8.8 Barren Lands Open Pit Oxide 2.59 11.7 11.4 9.4 Redeemer North Underground Fresh 2.63 13.9 12.4 10.7 Waroonga Underground Fresh 2.84 16.4 16.2 13.2 Redeemer Zone 2 Underground Fresh 2.71 22.8 16.2 15.7 Barren Lands Underground Fresh 2.78 22.9 21.8 18.1 New Holland Underground Fresh 2.79 25.8 19.3 18.2 Source: Agnew CPR 2021 From an operational perspective, the mill throughput is managed on a short to medium term basis, considering mined ore supply availability, gold grades of the available mined ores, and the plant downstream constraints (e.g., tailings pumping capacity), through the selection of the crusher/mill feed blend. As at the end of 2021, Waroonga and New Holland underground ores are the only two ore sources (shown emphasized in Table 10.2.6) that are being mined and fed to the processing plant. 10.3 Plant Sampling Daily composite samples of process plant feed and tailings streams are taken to assist with on-site gold accounting and reconciliation. These samples are collected using a combination of automatic sampling stations as well as manual cuts using appropriately designed samplers. The analysis of the samples used for accounting purposes is conducted by ALS at its Kalgoorlie laboratory. Solid sample composites are analyzed using fire assay with an AAS finish. Carbon sample composites are analyzed using high temperature ashing, acid digest and an AAS finish. Solution sample composites are analyzed using DIBK extraction and an AAS finish. All laboratory assaying procedures are aligned with standard industry practices. In accordance with Gold Fields Plant Metal Accounting Standard, a gold in circuit survey is undertaken monthly to reconcile (by mass balance) the back-calculated gold grade of the mill feed with the mill feed grade estimates obtained using plant samples and assays. The monthly variance between the assayed grade and the back-calculated grade is monitored, and an investigation is required to be carried out if this variance exceeds the minimum allowable levels outlined in the Gold Fields Plant Metal Accounting Standard.
P a g e 66 | 138 10.4 Deleterious Elements The testwork procedures include analysis for elements that could be deleterious to plant recovery (e.g., arsenic, tellurium, antimony and organic carbon). However, to date no specific deleterious mineral species have been identified that significantly and consistently influence gold recovery estimates. Many of the Agnew ore sources are notably enriched in arsenic grade, however, based upon the metallurgical testwork results, it appears that high arsenic content is not a reliable indicator of lower gold recovery. Further to this, due to the limited availability of arsenic grade data in the exploration assay database, it is not possible to estimate arsenic grade distribution within the Agnew mineralisation areas. 10.5 Metallurgical Risks In the opinion of the Qualified person, the combination of a well-established processing plant with a known operating history of treating ores mined from the associated mining leases, together with the ongoing and active metallurgical testwork programme assessing core samples selected from future local mineralisation areas, provides a reasonable platform for estimating the associated metallurgical and processing modifying factors underpinning the 2021 Mineral reserves. However, it is noted that uncertainties remain, and some key potential areas of risk and uncertainty are discussed in the following sections. 10.5.1 Sample Representativity Metallurgical sample selection is an important aspect of the process of developing resources into reserves. The results of the testwork undertaken on those samples are often used directly as input into plant performance estimates that are then used for the life of mine and reserve financial evaluations. It is important that the metallurgical samples are representatively selected, for example, to cover a suitable range of gold head grades, to consider the different geological lithologies and domains expected to be encountered, and to appropriately incorporate internal and external material dilution expected during the mining process. Individually testing different head grades ranges and geological domains improves the ability to see the metallurgical response variability of the orebody, which improves the ability to make better judgements and estimates about how the material could perform in the processing plant. As new potentially economic mineralized areas are identified at the mine, the site’s exploration geologists and metallurgists will select a few, to several, core composite samples of each new mineralisation area, and submit to a commercial metallurgical laboratory for the undertaking of a defined testwork programme including, head assays, recovery, and physical properties analyses. Whilst effort and care are taken with the sample selection process, there are practical constraints to samples numbers due to core availability and testwork cost, and therefore it is not possible for the Qualified person to guarantee that the proposed reserves have been fully representatively sampled, and therefore some inherent uncertainty will remain. 10.5.2 Laboratory Test Methods and Scale-up The laboratory test results require scale-up to estimate performance through the industrial processing facility. The metallurgical testing regime adopted has been specifically tailored to provide results that reasonably and practically represent the actual installed processing facility. This regime has been developed from experience gained over many years of undertaking such work, culminating in eventual mining, and processing of ores that have been historically metallurgically tested. Gravity and leach recoveries achieved in the laboratory are assumed to be achievable within the plant. Overall laboratory recovery results are typically model-fitted to a bounded sample head grade relationship, and this resulting model is assumed to be reasonably achievable at plant scale. Hardness properties are applied to the Morrell Total Power method to estimate grinding mill throughputs.
P a g e 67 | 138 However, there remains potential risk associated with the delivery of these metallurgical testing results associated with the differences between laboratory methods and full-scale processes, and miscellaneous and unidentified errors associated with undertaking the testing. The selected laboratory (ALS Metallurgy, Balcatta, Western Australia) that is undertaking the metallurgical testwork is highly regarded within the local gold mining industry, and has an established history of performing well, with both Gold Fields and the Qualified person. No pilot-plant testing is carried out prior to reserve declaration and subsequent mining, and the metallurgical properties are based on bench scale test results only. The sample requirements and cost for pilot testing are considered as being prohibitive. However, given the relative simplicity of Agnew’s processing facility, a history of successful operation, and in being consistent with practices adopted for other similar operations, it is the opinion of the Qualified person that pilot plant testing is not required for the estimation of plant modifying factors for the 2021 reserves. Despite reasonable efforts and care in the application of scale-up factors and modeling methods, there remains some inherent uncertainty in actual performance of the industrial facility predicted from a small volume of small-scale laboratory tests. One of the key challenges in confirming scale-up is the practice of ore blending of the plant feed (to optimize overall performance of the plant) which can limit regular direct comparison of plant performance and laboratory test results over the longer term. 10.5.3 Deleterious Elements The routine metallurgical testwork programme includes detailed head analysis (multi-element ICP-MS scan) to check for quantities of potential deleterious elements to the plant, such as mercury, arsenic, organic carbon, antimony, tellurium, base metals, etc. Whilst this assessment is carried out on the limited number of metallurgical composite samples, it is not typically undertaken on individual exploration samples. The multi-elemental assay results obtained from the metallurgical samples are used as a guide to identify if there are any deleterious elements at concentrations that would be of reasonable concern that could materially impact plant performance. If such a species is identified then the option to submit a larger number of individual exploration samples for detailed analysis, to better quantify and locate the deleterious species, is readily available. However, it needs to be recognized that the relatively low number of metallurgical samples initially checked for deleterious elements means that some inherent risk remains of unexpectedly encountering such a species during subsequent mining and processing operations, despite such elements not being identified during metallurgical testing.
P a g e 68 | 138 11 Mineral resource estimates Agnew’s Mineral resources undergo an initial assessment through the application of a range of assumed technical and economic factors to ensure reasonable prospects for economic extraction. The in-situ cut-off grade has modifying factors applied and all material within the pit shell or MSO shape above the calculated cut-off grade is judged to have reasonable prospects for economic extraction. The Mineral resources are 100 % attributable to Gold Fields and are net of production depletion up to 31 December 2021. The point of reference for the Mineral resources is in-situ over a minimum mining width with dilution applied. Open pit Mineral resources are confined to pit shells and underground Mineral resources are constrained to a practical mining shape and a minimum mining width. 11.1 Mineral resources estimation criteria 11.1.1 Geological model and interpretation Agnew’s Mineral resources are estimated from three-dimensional (3D) models of the in-situ gold mineralisation. These resource models are based on the mineralized domain and geostatistical zone models which are developed to reflect the current understanding of the controls on mineralisation. The models are constructed by Agnew site geologists through a process of geological interpretation considering lithology, structural controls, alteration and mineralisation in plan, section and orthogonal three-dimensional 3D views. Each model is reviewed and updated as new information is collected. Geological surfaces and volumes are represented using wireframes. These are generated through triangulation or interpolation techniques based on intervals selected by the geologist from drill holes. Mineralisation volumes are generally represented by wireframes; however, for some mineralisation styles, probabilistic interpolation models are also used. Prior to block modelling and grade estimation, the geological interpretations undergo a documentation peer review and sign-off process. All files used and created in the interpretation process are stored on the Agnew IT network. If logging data does not fit the mineralisation model or the surrounding holes in the interpretation, a validation/review of the original logging is carried out. This may result in re-logging of the hole or a change to the model and interpretation depending on the outcome of the review. 11.1.2 Block modelling 3D block models of the in-situ mineralisation are constructed based on the geological interpretations. The block models utilize sub-celling to ensure the block model volume closely represents the volume of the wireframe model. At the end of the modelling process, the volume is depleted to account for material already mined out. The various block models utilized for the estimates are summarized in Table 11.1.1.
P a g e 69 | 138 Table 11.1.1: Summary of mineral inventory models Model Model name Year Axis Origin Parent block size Number of blocks Min subcell size Max subcell size (m) (m) (m) Claudius 1810.cl.md.dm 2018 Easting (X) 79740 5 212 0.5 5 Northing (Y) 29500 10 190 0.5 10 Elevation (Z) 9600 10 91 0.5 10 Maria 1904.mar.md.eng.dm 2019 Easting (X) 259600 5 40 0.2 5 Northing (Y) 6919900 5 810 1.25 5 Elevation (Z) 40 5 320 0.005 5 Cams 0805.cams.lg.0.md.dm 2008 Easting (X) 57320 10 45 1.25 10 Northing (Y) 29908 12.5 34 1.25 12.5 Elevation (Z) 318 3 50 0.1 3 Redeemer Zone 2 & Redeemer North red.2109.md.dm 2021 Easting (X) 79600 20 50 0.2 20 Northing (Y) 31500 20 143 2.5 20 Elevation (Z) 9365 20 57 0.2 20 Barren Lands 2109.bl.md.dm 2021 Easting (X) 79970 20 26 0.2 19.8 Northing (Y) 34650 20 76 2.5 17.5 Elevation (Z) 9800 20 36 1 19 450 South 1809.450.md.dm 2018 Easting (X) 79790 20 16 0.2 20 Northing (Y) 38500 20 30 2.5 20 Elevation (Z) 10310 20 12 1 20 Kim 2107.kim.md.dm 2021 Easting (X) 79900 10 85 0.1 10 Northing (Y) 39800 10 75 1.25 10 Elevation (Z) 8950 10 120 0.5 10 FBH fbh.2105.md.dm 2021 Easting (X) 79010 20 34 0.1 20 Northing (Y) 39060 20 55 2.5 20 Elevation (Z) 8970 20 39 1 20 Kath kwn.2109.md.dm 2021 Easting (X) 79090 20 47 0.1 20 Northing (Y) 39900 20 79 2.5 20 Elevation (Z) 9090 20 71 0.2 20 Waroonga North kwn.2109.md.dm 2021 Easting (X) 79090 20 47 0.1 20 Northing (Y) 39900 20 79 2.5 20 Elevation (Z) 9090 20 71 0.2 20 Main North Main South Rajah 1909.mr.md.dm 2019 Easting (X) 79450 5 116 1 5 Northing (Y) 38940 5 192 1 5 Elevation (Z) 9750 5 152 1 5 Lower Genesis (LGX) lgx.2107.c.md.dm 2021 Easting (X) 3500 10 55 1.0 10 Northing (Y) 11500 10 250 0.5 10 Elevation (Z) 100 10 120 0.2 10 Cinderella cind.2002.md.eng.dm 2020 Easting (X) 3780 20 26 1.25 10 Northing (Y) 10500 20 53 1.25 12.5 Elevation (Z) 1100 10 42 0.1 3 Sheba sh.2109.s.md.eng.dm 2021 Easting (X) 3340 20 33 0.2 20 Northing (Y) 8800 20 135 1 20 Elevation (Z) 160 10 77 0.1 10 Upper NH & Upper Genesis nhg.1909.md.dm 2015 Easting (X) 3350 20 35 1 20 Northing (Y) 10900 20 95 1 20 Elevation (Z) 700 10 82 0.2 10 GE200 ge200.1504.2.md.eng.dm Easting (X) 3580 20 18 1 20 Northing (Y) 12500 20 51 1 20 Elevation (Z) 1180 10 16 0.2 10 Himitsu ghs.2008.s.md.eng.dm 2020 Easting (X) 3400 20 34 1 20 Northing (Y) 9100 20 92 1 20 Elevation (Z) 900 10 66 0.1 10 Hidden Secret, Glasgow Lass, & Dobra Serica ghs.2008.s.md.eng.dm 2020 Easting (X) 3400 20 34 1 20 Northing (Y) 9100 20 92 1 20 Elevation (Z) 900 10 66 0.1 10 Leviathan North 1904.ln.md.dm 2019 Easting (X) 270150 20 43 1 20 Northing (Y) 6891300 20 85 1 20 Elevation (Z) 200 5 128 0.5 5 Source: Agnew CPR 2021
P a g e 70 | 138 11.1.3 Bulk density Dry bulk density is assigned to the model based on the geological interpretation of lithology and weathering. Average density values are estimated for each geological unit based on regular and systematic measurements taken on exploration diamond drilling core according to a formal protocol (refer to Section 7.5). Hand specimens from operating underground mining areas are also collected to confirm values. On new projects where no data is available, known densities from similar deposits are used until actual data becomes available. See Table 7.5.1 for density values used at Agnew. 11.1.4 Compositing and domaining Analysis of the grade data is carried out prior to estimation. Samples, predominately from Diamond and Reverse circulation drilling are composited to one metre intervals for broad mineralized zones. For narrow mineralized lodes, compositing is to the full width of the lode and the length is corrected to reflect the true width across the lode. The output composited drill hole assay database is uniquely flagged with mineralized domain codes using the interpretation boundaries. Additional sub-domains are added where distinct grade populations exist within the broader interpretation domains. The relationship between domains is assessed to determine how they are used during grade interpolation. Distinct domains utilize hard grade boundaries during interpolation. Where domains share similar gold distribution characteristics, a soft or gradational boundary is used for interpolation. 11.1.5 Top cuts Top cuts are used to control grade outliers during estimation. Grades above a selected threshold are capped to the threshold, therefore retaining the high-grade nature locally while controlling the influence on the estimation. Top cuts are determined per domain through analysis of probability plots, histograms and reviewing the samples at the top end of the grade distribution. Commonly the selected thresholds correspond to the 97.5 to 99 percentiles of the distribution. Top cuts for one metre composites are selected on gold grade after compositing. Top cuts for full width lode composites are selected on accumulated metal after compositing. The top cuts used for the various resource models are presented in Table 11.1.3. 11.1.6 Variography A variogram is a description of the spatial continuity of the data and the estimation methods used at Agnew rely on the properties of the variograms and therefore this is an important aspect of the estimation process. Variogram studies are carried out on composited data for individual domains on gold or accumulated metal (gold x true thickness). The variogram analysis is used to evaluate the spatial continuity of the mineralisation and to create a three-dimensional (3D) or two-dimensional (2D) model of how grades change with distance. The analysis of the variography is used to determine the search parameters in the grade estimation process. For further detail on variography and estimation parameters refer to Table 11.1.2.
P a g e 71 | 138 Table 11.1.2: Summary of variogram parameters Mineral resource Main domain Variable/ 2D/3D Variogram type Direction Nugget Sill 1 Range 1 Sill 2 Range 2 Sill 3 Range 3 (m) (m) (m) Claudius Basalt lode Gold 3D Normal scores (back-transformed) 1 (-34°→347°) 0.600 0.250 12 0.150 40 - - 2 (42°→041°) 12 22 - 3 (-30°→100°) 2.5 13 - Maria Main lode Accumulation 2D Normal scores (back-transformed) 1 (-40°→000°) 0.280 0.300 10 0.420 60 - - 2 (50°→000°) 10 20 - Cams Main lode Gold 3D Normal scores (back-transformed) 1 (-10°→003°) 0.360 0.520 15 0.120 1000 2 (-28°→267°) 10 40 3 (60°→290°) 10 20 Redeemer Zone 2 & Redeemer North Zone 2 North Accumulation 2D Normal scores (back-transformed) 1 (-10°→000°) 0.270 0.340 40 0.260 75 0.130 250 2 (80°→000°) 15 70 160 Redeemer North Gold 3D 1 (00°→340°) 0.590 0.220 20 0.190 60 - - 2 (-80°→250°) 25 60 - 3 (10°→250°) 5 15 - Barren Lands Main lode Accumulation 2D Normal scores (back-transformed) 1 (40°→000°) 0.360 0.510 40 0.130 60 - - 2 (50°→180°) 20 35 - 450 South Cross lode Gold 3D Normal scores (back-transformed) 1 (-50°→320°) 0.510 0.310 8 0.180 20 - - 2 (-40°→140°) 3 8 - 3 (00°→230°) 3 8 - Kim Kim lode Gold Pseudo 2D Normal scores (back-transformed) 1 (-85°→000°) 0.363 0.325 5 0.095 30 0.220 260 2 (5°→000°) 5 20 80 3 (00°→090°) 5 4 1 FBH Bengal lode Accumulation 2D Normal scores (back-transformed) 1 (-49°→319°) 0.210 0.350 20 0.220 50 0.220 80 2 (26°→196°) 7 20 25 Kath Kath lode Accumulation 2D Normal scores (back-transformed) 1 (70°→000°) 0.300 0.160 35 0.160 70 0.380 230 2 (20°→180°) 20 55 55 Waroonga North Aurora lode Accumulation 2D Normal scores (back-transformed) 1 (55°→000°) 0.360 0.210 15 0.210 30 0.220 200 2 (35°→180°) 6 20 35 Main North Main South Rajah SKcU3 Lode 201 Gold 3D Normal scores (back-transformed) 1 (-52°→330°) 0.500 0.190 9 0.130 15 0.180 40 2 (34°→000°) 9 15 40 3 (-15°→080°) 5 12 16 SKcU2 Lode 401 1 (-58°→301°) 0.530 0.210 10 0.130 30 0.130 250 2 (18°→359°) 10 15 35 3 (-25°→080°) 6 15 35 Lower Genesis (LGX) 500 series Gold 2D Normal scores (back-transformed) 1 (00°→350°) 0.270 0.550 25 0.180 170 - - 2 (00°→260°) 15 55 - Easterlies Gold 3D 1 (00°→150°) 0.460 0.370 7.5 0.170 75 - - 2 (-20°→060°) 5 40 - 3 (70°→060°) 5 10 - Cinderella 620832 Accumulation 2D Normal scores (back-transformed) 1 (00°→180°) 0.290 0.340 10 0.170 15 0.130 35 2 (00°→090°) 5 10 25 621410 1 (00°→165°) 0.300 0.350 15 0.160 55 0.190 90 2 (00°→075°) 15 25 45 Sheba Sheba South lode Accumulation 2D Normal scores (back-transformed) 1 (85°→180°) 0.500 0.340 43 0.160 327 - - 2 (-05°→180°) 35 57 - Easterlies Gold 3D Normal scores 1 (0°→005°) 0.19 0.56 28 0.25 208 - - 2 (90°000°) 25 153 - 3 (-80°→275°) 7 64 - Upper NH & Upper Genesis Grouped westerlies Accumulation 2D Normal scores (back-transformed) 1 (00°→005°) 0.340 0.420 20 0.25 100 - - 2 (00°→095°) 10 25 - Easterlies Gold 3D 1 (00°→160°) 0.36 0.58 10 0.06 20 - - 2 (-25°→070°) 10 20 - 3 (65°→070°) 3 6 - GE200 200 series Gold Pseudo 2D Normal scores (back-transformed) 1 (00°→130°) 0.470 0.330 35 0.200 130 - - 2 (00°→340°) 25 40 - 3 (90°→000°) 5 7 - Himitsu 721810 westerly Accumulation 2D Normal scores (back-transformed) 1 (00°→130°) 0.390 0.480 15 0.130 72 - - 2 (00°→340°) 15 30 -
P a g e 72 | 138 Mineral resource Main domain Variable/ 2D/3D Variogram type Direction Nugget Sill 1 Range 1 Sill 2 Range 2 Sill 3 Range 3 (m) (m) (m) Hidden Secret, Glasgow Lass, & Dobra Serica Main sandstone host unit Gold 3D Normal scores 1 (00°→005°) 0.240 0.420 35 0.340 180 - - 2 (-80°→275°) 18 72 - 3 (10°→275°) 13 30 - Leviathan North Flat Supergene Lode26 Gold 3D Normal scores (back-transformed) 1 (00°→160°) 0.530 0.350 15 0.120 45 - - 2 (00°→070°) 10 30 - 3 (90°→000°) 3 10 - Notes: a) The variogram parameters for only the primary domain(s) are shown in the table. b) Normal scores transformed variograms are initially modelled before back-transformation, as they provide an efficient way of dealing with the skewed gold distributions during variogram modelling c) Pseudo 2D variogram models are derived from experimental variograms on 1m composites flattened to the mid-plane of the lode Source: Agnew CPR 2021 The Qualified person’s opinion is that the variograms are a practical reflection of spatial continuity of the respective mineralisation grades and their application to the geostatistical analysis is adequate to minimize uncertainty and to derive appropriate resource block models for use by the planning engineers. 11.1.7 Grade estimation Grade estimation is underpinned by the geological interpretation to reflect the controls on gold mineralisation at each deposit. Gold is the only grade variable considered and as such, no correlations between elements are made for resource estimation. Advanced geostatistical grade estimation techniques such as ordinary kriging (OK), simple kriging (SK) and conditional simulation (CS) are utilized at Agnew (Table 11.1.3). The grade estimation technique is selected based on the geological models, data spacing, statistical distributions and spatial analyses of the grade data. The conditional simulation recoverable estimates are localized (LSMU). Table 11.1.3: Summary of Mineral resource estimation parameters Mineral resource Search distances* Min, max samples Parent cell sizes (X, Y, Z) Domains Estimator Sample types Top cuts** Claudius 65 m x 40 m x 10 m 10, 20 5 m x 10 m x 10 m Lode and lithology 3D OK Au 30 % surface core 45 % underground core 20 % surface RC 30 – 200 g/t Au Maria 40 m x 20 m x 20 m 6, 16 (lodes) 8, 12 (HW) 20 m x 20 m x 20 m Lode and lithology Lodes: 2D OK Accumulation Mainly surface RC some NQ core. 80 – 100 mg/t GM Octant search 10 m x 10 m x 10 m Halo: 3D OK Au 30 m x 20 m x 10 m (HW) 5 m x 5 m x 5 m HW: 3D OK Au Cams 50 m x 50 m x 10 m 8, 60 10 m x 12.5 m x 3 m Lode 3D OK Au Mainly surface RC, some core 35 g/t Au Redeemer Zone 2 & Redeemer North 250 m x 160 m x 10 m 4, 16 20 m x 20 m x 20 m Lode and lithology Lodes: 2D OK Accumulation & 3D OK Au Surface and underground core Lodes: 12–145 mg/t GM 90 m x 90 m x 15 m 12, 40 10 m x 10 m x 10 m 15-86 g/t Au 5 m x 5 m x 5 m Halo: 3D OK Au Halo: 3-10 g/t Au Barren Lands 75 m x 40 m x 25 m 5, 9 20 m x 20 m x 20 m Lode, lithology & weathering Lodes:2D OK Accumulation Surface RC for shallow areas, core for deeper areas 15 to 160 m g/t GM HG lodes 10 m x 10 m x 10 m Halo: 3D OK Au 210 m x 50 m x 10 m LG lodes 5 m x 5 m x 5 m 450 South 60 m x 40 m x 40 m 4, 12 20 m x 20 m x 20 m Lode and lithology Lodes: 2D OK Accumulation Mainly surface RC, some core 20 – 50 mg/t GM 40 m x 20 m x 20 m octant search used 12, 24 10 m x 1 0 m x 10 m Cross lode & Halo: 3D OK Au 20 – 65 g/t Au 5 m x 5 m x 5 m Kim 270 m x 80 m x 20 10, 24 10 m x 10 m x 10 m Lode and lithology Pseudo 2D OK & SK Au Surface and underground core 2 – 300 g/t Au Octant search FBH 60 m x 40 m x 40 m 5, 12 (lodes) 20 m x 20 m x 20 m Lode and lithology Lodes: 2D OK Accumulation Surface and underground core and face (in grade control areas) Lodes: 5-550 mg/t (lodes) 12, 24 (halo) 10 m x 10 m x 10 m Halo: 3D Au OK Halo: 0.8-140 g/t Au various (halo) 5 m x 5 m x 5 m Kath 230 m x 55 m x 55 m 4, 12 20 m x 20 m x 20 m Lode and lithology Lodes: 2D OK Accumulation Surface and underground core and face (in 5 m x 5 m x 5 m grade control areas) Lodes: 30-300 m g/t Octant search 10 m x 10 m x 10 m Halo: 3D Au OK 15-107 g/t Au 5 m x 5 m x 5 m Halo:1-80 g/t Au Waroonga North 200 m x 40 m x 10 m 4, 12 20 m x 20 m x 20 m Lode and lithology Lodes: 2D OK Accumulation Surface and underground core and face (in 5 m x 5 m x 5 m grade control areas) Lodes: 36-220 m g/t Octant search 10 m x 10 m x 10 m Halo: 3D OK Au 16-105 g/t Au 5 m x 5 m x 5 m Halo:1-80 g/t Au Main North 100 m x 40 m x 40 m 10, 30 20 m x 20 m x 20 m Lode and lithology 3D OK Au Surface and underground core and faces 40 – 170 g/t Au Main South 10 m x 10 m x 10 m Rajah 5 m x 5 m x 5 m Lower Genesis (LGX) Various (Westerly) 10, 20 (Westerly) 10 m x 10 m x 10 m Lode and lithology Lodes: 2D OK Au Surface and underground core and faces Lodes: 8-200 g/t Au 75 m x 40 m x 10 m (Easterly) 10, 30 (Easterly) 5 m x 5 m x 5 m Easterlies: 3D OK Au Halo: 1-150 g/t Au Cinderella 30 m x 20 m x 20 m 3, 6 10 m x 10 m x 10 m Lode and lithology Lodes: 2D OK Accumulation 90 - 460 m g/t 5 m x 5 m x 5 m Halo: 3D Au OK 1-170 g/t Au
P a g e 73 | 138 Mineral resource Search distances* Min, max samples Parent cell sizes (X, Y, Z) Domains Estimator Sample types Top cuts** Surface RC, surface core; underground core and faces Sheba 100 m x 25 m x 25 m (Sheba South lode) 5, 12 (Westerly) 20 m x 20 m x 20 m Lode and lithology Lodes: 2D OK Accumulation Surface and underground core and faces Westerly: 25 -330 m g/t 10 m x 10 m x 10 m 208 m x 153 m x 64 m (Easterly) 8, 30 (Easterly) 5 m x 5 m x 5 m Easterlies: Localised SMU CS Au Easterly: 25-500 g/t Au Upper NH & Upper Genesis 60 m x 20 m x 10 m (Westerly) 6, 12 (Westerly) 20 m x 2 0 m x 10 m Lode and lithology Lodes: 2D OK Accumulation Surface and underground core 15 -160 m g/t (Westerly) 60 m x 40 m x 5 m (Easterly) 10, 20 (Easterly) 10 m x 10 m x 10 m Easterlies: 3D OK Au 5-100 g/t Au (Easterly) 5 m x 5 m x 5 m GE200 130 m x 40 m x 7 m 25, 40 10 m x 10 m x 5 m Lode Pseudo 2D SK Au Surface and underground core 25 g/t Au Himitsu 50 m x 30 m x 30 m 3, 10 10 m x 10 m x 10 m Lode and lithology Lodes:2D OK Accumulation Surface RC, surface core, underground core and faces 22 to 100 m g/t Halo: 3D OK Au Hidden Secret, Glasgow Lass, & Dobra Serica 180 m x 72 m x 30 m 8, 30 5 m x 5 m x 5 m Lithology & weathering Localised SMU Au Surface RC and surface core 20 to 250 g/t Au Leviathan North 50 m x 25 m x 10 m (Steep) 10, 21 (Steep) 20 m x 20 m x 5 m Lode, lithology & weathering 3D OK Au Mainly surface RC some core 30 g/t Au 50 m x 25 m x 8 m (Flat) 12, 21 (Flat) 10 m x 10 m x 5 m Notes: * Based on variogram model and lode orientation, varies by domain/lode. The search distances for only the primary lode are shown in the table. ** Based on statistical analysis by domain/lode, varies by domain/lode. The range of top cuts is shown in the table. GM Based on 2D accumulation CS Localized Conditional Simulation Pseudo 2D – 1m composites are flattened to the mid-plane of the lode, estimation is carried out in flattened space and then returned to 3D Source: Source: Agnew CPR, 2021 Search ellipsoids are oriented preferentially to the orientation of the principal controlling feature in each lode. A multiple pass approach is used for grade interpolation within the estimation domains. The first pass uses the optimized search parameters for the lode at the nominal drill spacing as summarized in Table 11.1.3. With each subsequent pass, the minimum number of samples is reduced and the search volume is increased. This approach enables most blocks to receive a grade estimate within the domains. Octant searches are applied in some areas adjacent to underground development to mitigate sample clustering within the development. Grades are estimated into block sizes (parent cells) optimized with respect to the nominal drill spacing. Dimensions of the parent cells are typically half to one quarter of the distance between drill holes at the nominal drill spacing. The parent cells are sub-celled to represent the volume within the domain. Different parent cell sizes are used in a model where there are distinct areas with different drill spacings. Parent cell sizes for the different models are presented in Table 11.1.3. Any model cells unsupported by data beyond the ranges of the variogram/search ellipse are not included in the Mineral resource estimate. The Qualified person’s opinion is that the respective geostatistical estimation methods and the corresponding input parameters are adequate to minimize uncertainty and to derive appropriate resource block models for use by the planning engineers, the inherent uncertainties relating to the Mineral resource are as documented under resource classification (Section 11.1.11). 11.1.8 Selective mining units The selective mining unit (SMU) size (i.e., the smallest practical volume of material on which ore and waste classification is determined) in open pits is currently assessed at 5 m x 5 m x 5 m (length, width, height). Selectivity for underground operations varies from 5 m x 5 m x 5 m to 10 m x 10 m x 10 m depending on the mining approach. Where there is sufficient data density, estimation is carried out directly to selective mining unit SMU sized blocks.
P a g e 74 | 138 11.1.9 Model validation Visual inspection and documented model reconciliation reviews/reporting are the main validation procedures employed. This includes a review of sections and plans where models are checked for proper coding of drill hole intervals and block model cells. Interpolated grades are examined relative to drill hole composite values. Other model validation checks carried out include: Comparative statistics. Global bias and local trends in the estimate. Comparative checks of grades between other interpolation methods. Swath plots. Global change of support. Agnew also has an extensive and proactive grade control and reconciliation process to review operational planning against actual performance. Model parameters and interpolation approaches are reviewed and adjusted as a continuous improvement process to improve reconciliation performance over time. The 2021 mine call factor over a three-month moving average ranged between 97 % and 122 % on a month-by-month basis. The average mine call factor for 2021 was 98 % for the year. The mine reconciliation gold figure was 109 % for 2021 with the grade recorded at 88 % and the tonnage at 112 %. 11.1.10 Cut-off grades Cut-off grades are influenced by the operating strategy, modifying factors, design and scheduling and certain costs including the ore / waste cost differential, and are therefore calculated annually in alignment with the Gold Fields cut- off grade guideline. Open pit The cut-off grades for the open pit Mineral resources by deposit are summarized in Table 11.1.4. Table 11.1.4: Agnew open pit resource cut-off grades Open pits Resource cut-off grade (g/t Au) RoM Leviathan North 0.78 Maria 0.77 Claudius 0.93 450 South 0.79 Barren Lands 0.76 Hidden Secret Complex 0.78 Redeemer North & South 0.82 Cams 0.90 Cinderella 0.82 Source: Agnew COG Report, 2021 The open pit resources are constrained to an optimal shell defined by a resource gold price of $1,500/oz and relevant unit costs and modifying factors. Optimization of the resource pit shell is carried out using Geovia Whittle software. The cut-off grade is calculated for the material within the pit shell using the following formula:
P a g e 75 | 138 [Ore Premium Mining Costs ($/t) + Process Costs ($/t) + Site G&A Costs ($/t)] [Price x (100 % - Ad valorem Royalty Rate) – All product related costs] x PRF x MCF x 0.03215075 Where: Ore Premium Mining Costs cover adjustments in ore haulage distances and differences in ore and waste drill and blast costs. All other mining costs are accounted for during the pit shell generation phase. Process Costs including sustaining capital. Site G&A Costs including off-site general, and administration (G&A) costs directly related to site (e.g., accounting or payroll services). Price is the gold price per ounce ($1,500/oz). The ad valorem Royalty Rate is 2.5 %. All product related costs include management fees, refining costs and contributions to the Gold Fields Foundation per ounce. PRF is the plant recovery factor or metallurgical recovery as a percentage estimated at a grade close to the cut- off grade. MCF is the mine call factor or the percentage of actual mill produced metal against the claim of metal produced. 0.03215075 is the ratio of troy ounces per gram. All material within the pit shell above the calculated cut-off grade is judged to have reasonable prospects for economic extraction. Underground The cut-off grades for the underground Mineral resources at Waroonga, New Holland and Redeemer by deposit are summarized in Table 11.1.5. Table 11.1.5: Agnew underground resource cut-off grades Area Resource cut-off grade (g/t Au) RoM Minimum mining width (m) Waroonga underground Kim South - Upper 3.12 3.0 Kim South - Lower 4.07 3.0 FBH - Upper 3.42 3.0 FBH - Mid 3.35 3.0 FBH - Lower 3.34 3.0 Main / Main South / Rajah 3.89 3.0 Waroonga North 3.78 3.0 Kath Lower 3.33 3.0 Kath Upper 3.12 3.0 New Holland and Redeemer underground Genesis 2.37 3.0 GE200 2.66 3.0 New Holland 2.66 3.0 Sheba 2.32 4.0 Cinderella 2.68 3.0 Himitsu 2.28 3.0 Hidden Secret 2.15 10.0
P a g e 76 | 138 Redeemer Zone 2 2.52 3.0 Redeemer North 2.95 3.0 Barren Lands 2.73 2.0 Claudius 3.11 3.5 Maria 2.58 2.7 Source: Agnew COG Report, 2021 The underground Mineral resource estimates are evaluated using the same formula and gold price of $1,500/oz. [Mining Costs ($/t) + Process Costs ($/t) + Site G&A Costs ($/t)] [Price x (100 % - Ad valorem Royalty Rate) – All product related costs] x PRF x MCF x 0.03215075 Where: Mining Costs take account the mining method and area being mined inclusive of secondary development and sustaining capital. The cut-off grade is applied to the deposit model as part of the assessment in relation to minimum mining width and realistic prospects of extraction. Minimum mining width and realistic extraction are assessed using a mineable shape optimizer (MSO) routine available in Datamine Studio RM® software. This routine generates a series of shapes that relate to a nominated selective mining unit SMU and a minimum width to maintain an average grade within the shape that is above the nominated cut-off grade. The selective mining unit SMU and minimum mining width are specified in line with current mining practices at Agnew. A footprint for each orebody is initially assessed at a sensitivity cut-off grade generated using plus 25 % resource gold price (~$1850/oz). MSO shapes generated at cut-off grades for the resource case (gold price $1500/oz) are removed where they are judged to be outside the initial footprint, too isolated and unlikely to be eventually economically extracted. This leaves a contiguous set of shapes. Small amounts of material below cut-off within the boundaries of the contiguous set of shapes are evaluated to determine if they would be extracted as part of a mining sequence. When close to existing mining areas, a further assessment is made to ensure that material is potentially extractable. Remnant mining areas are coded using a stand-off distance to existing stopes. Mineralisation inside the stand-off zones is not reported as a Mineral resource except where an engineering assessment has resulted in the design and potential extraction of planned stopes. All material within the retained MSO shapes above the calculated cut-off grade is judged to have reasonable prospects for economic extraction and may practically include some material below the cut-off grade that is extracted as part of the mine design and sequence to mine the higher grade (above cut-off) material. Gold Fields conducts an annual review of metal prices for Mineral resource and Mineral reserve reporting to monitor any significant changes that would warrant re-calibrating the price deck for strategic and business planning purposes. This review takes into account prevailing economic, commodity price and exchange rate trends, together with market consensus forecasts, including from global industry analysts and financial institutions, as well as Gold Fields’ strategy and expectations for the mine operations. The Mineral resource and Mineral reserve gold prices have been selected and justified by the Qualified person at $1,500/oz per troy ounce (oz) for resource and at $1,300 per troy ounce (oz) for reserve (life of mine planning and reserve techno-economic modelling). This metal price deck has also been reviewed and endorsed by the Company executive team. For more information on the rationale applied to deriving the Mineral resource and Mineral reserve metal price deck refer to chapter 16. The selected resource gold price of $1,500/oz is at a 15 % premium to the reserve price with the differential being in general alignment with Gold Fields standard practice for setting the Mineral resource price. The 15 % premium on resources is to provide useful information on the sites resource potential and its impact at higher gold prices and to indicate possible future site infrastructure, permitting, licencing, mining footprint and tailings and waste storage
P a g e 77 | 138 requirements. This information is important to determine the Reasonable prospects of economic extraction for the Mineral resources. The Qualified person has concluded that reasonable prospects for economic extraction have been demonstrated through the application of an appropriate level of consideration of the potential viability of the Mineral resources. These considerations include a reasoned assessment of the geological, engineering (including mining and processing parameters), metallurgical, legal, infrastructural, environmental, marketing, socio-political and economic assumptions which, in the opinion of the Qualified person, are likely to influence the prospect of economic extraction. Although all permitting may not be finalised for some Mineral resources, there is no reason to expect that these permits will not be granted based on existing processes and protocols. 11.1.11 Classification criteria Agnew’s in-situ Mineral resources are classified as either measured, indicated or inferred in accordance with the definitions in Subpart 229.1300 of Regulation S-K. Increasing levels of geoscientific knowledge and confidence are generally based on geological understanding, grade continuity, drill hole/sample spacing, sample data quality, estimation quality, physical characteristics, mining development (i.e., amount of exposed and mapped mineralisation) and mining history. The Measured category also requires adjacent face sampling and mapping. Sample spacing at Agnew varies depending on the geological complexity of the deposit and mining history. In general, and depending on the geology of the deposit, indicated Mineral resources are considered for nominal drill grid spacings between 20 m x 20 m and 40 m x 40 m and inferred Mineral resources are considered for nominal drill grid spacings between 40 m x 40 m and 80 m x 80 m or greater. Measured Mineral resources are considered for nominal 10 m x 5 m or 10 m x 10 m spacings in open pits and are generally developed along strike on 20 m x 25 m spaced levels underground. Agnew’s surface resources are comprised of stockpiles. Stockpiles are managed and monitored when mining occurs and are supported by adequate sampling, surveying and end of month reconciliation and are thus classified as measured Mineral resources. The resource classification and nominal drill spacing resource area are summarized in Table 11.1.6. Table 11.1.6: Agnew resource classification criteria by area Mineral resource Mineral resource category Nominal drill hole grid spacing range length (m) x width (m) Geological setting and mineralisation style Claudius Inferred 40 m x 40 m to 80 m x 80 m Claudius Basalt host rock associated with and Ultramafic contact, gold mineralisation associated with magnetite, biotite, epidote and chlorite alteration. Indicated 20 m x 20 m to 40 m x 40 m Maria Inferred 40 m x 40 m to 80 m x 80 m Mt White Syncline conglomerates host rock, gold mineralisation associated with shear zone and quartz veins. Indicated 20 m x 20 m to 40 m x 40 m Cams Inferred 20 m x 20 m Cams gabbro and mafics host rock, gold mineralisation associated with quartz veining, shears and felsic porphyry intrusions. Cams resource is considered Inferred due to uncertainty in the current geological interpretation. Redeemer Zone 2 Inferred 60 m x 60 m to 80 m x 80 m Scotty Creek pebbly sandstones host rock, gold mineralisation associated with quartz veins. Indicated 20 m x 20 m to 60 m x 60 m Redeemer North Inferred 40 m x 40 m to 80 m x 80 m Redeemer Basalt and Mine Corridor Conglomerate host rock, gold mineralisation associated with biotite-actinolite alteration and microshears. Indicated 20 m x 20 m to 40 m x 40 m Barren Lands Inferred 40 m x 40 m to 80 m x 80 m Scotty Creek pebbly sandstones/siltstones host rock, gold mineralisation associated with quartz veins. Indicated 20 m x 20 m to 40 m x 40 m 450 South Inferred 40 m x 40 m to 80 m x 80 m Waroonga Mine Corridor Conglomerate host rock, gold mineralisation associated with extensional shears and shear-related quartz veins, amphibole alteration. Indicated 20 m x 20 m to 40 m x 40 m Kim Inferred 40 m x 40 m to 80 m x 80 m Waroonga Mine Corridor Conglomerate host rock, gold mineralisation associated with extensional shears and shear-related quartz veins. Indicated 20 m x 20 m to 40 m x 40 m Measured 20 m x 20 m FBH Inferred 40 m x 40 m to 80 m x 80 m Waroonga Mine Corridor Conglomerate host rock, gold mineralisation associated with extensional shears and shear-related quartz veins. Indicated 20 m x 20 m to 40 m x 40 m Kath Inferred 40 m x 40 m to 80 m x 80 m
P a g e 78 | 138 Mineral resource Mineral resource category Nominal drill hole grid spacing range length (m) x width (m) Geological setting and mineralisation style Indicated 20 m x 20 m to 40 m x 40 m Waroonga Mine Corridor Conglomerate host rock, gold mineralisation associated with extensional shears and shear-related quartz veins ±10 m from the mid-plane of the Kim Fault is Inferred due to uncertainty in the continuity of the lode through the fault. Waroonga North Inferred 40 m x 40 m to 80 m x 80 m Waroonga Mine Corridor Conglomerate host rock, gold mineralisation associated with extensional shears and shear-related quartz veins, amphibole alteration. Indicated 20 m x 20 m to 40 m x 40 m Main North Main South Rajah Inferred 40 m x 40 m to 80 m x 80 m Waroonga Mine Corridor Conglomerate host rock, gold mineralisation associated with extensional shears and shear-related quartz veins. Indicated 20 m x 20 m to 40 m x 40 m Lower Genesis (LGX) Inferred 40 m x 40 m Scotty Creek sandstones/siltstones host rock, gold mineralisation associated with 500 series (depleted), westerlies style quartz veins. Indicated 20 m x 20 m Measured 10 m x 10 m with ore development Inferred 10 m x 10 m to 20 m x 20 m Scotty Creek sandstones/siltstones host rock, gold mineralisation associated with easterlies style short scale quartz veins. Indicated 5 m x 5 m to 10 m x 10 m Cinderella Inferred 20 m x 20 m to 40 m x 40 m Scotty Creek sandstones/siltstones host rock, gold mineralisation associated with westerlies style quartz veins (depleted) with short scale wing veins. Indicated 10 m x 10 m to 20 m x 20 m Sheba Inferred 20 m x 20 m to 40 m x 40 m Scotty Creek sandstones/siltstones host rock, gold mineralisation associated with westerlies style quartz veins. Indicated 10 m by 10 m to 20 m x 20 m Inferred 20 m x 20 m to 40 m x 40 m Scotty Creek sandstones/siltstones host rock, gold mineralisation associated with easterlies style short scale quartz veins, model method suitable for bulk mining assessment. Indicated 10 m x 10 m to 20 m x 20 m Upper NH & Upper Genesis Inferred 20 m x 20 m to 40 m x 40 m Scotty Creek sandstones/siltstones host rock, gold mineralisation associated with westerlies style quartz veins (depleted). Indicated 10 m x 10 m to 20 m x 20 m Inferred 10 m x 10 m to 20 m x 20 m Scotty Creek sandstones/siltstones host rock, gold mineralisation associated with easterlies style short scale quartz veins. Indicated 5 m x 5 m to 10 m x 10 m GE200 Inferred 20 m x 20 m to 40 m x 40 m Scotty Creek sandstones/siltstones host rock, gold mineralisation associated with westerlies style quartz veins. All of northern area is Inferred due to interpretation change. Indicated 10 m x 10 m to 20 m x 20 m Himitsu Inferred 20 m x 20 m to 40 m x 40 m Scotty Creek sandstones/siltstones host rock, gold mineralisation associated with westerlies style quartz veins (depleted). Indicated 10 m x 10 m to 20 m x 20 m Hidden Secret, Glasgow Lass, & Dobra Serica Inferred 20 m x 20 m to 40 m x 40 m Scotty Creek sandstones/siltstones host rock, gold mineralisation associated with easterlies style short scale quartz veins, model method suitable for bulk mining assessment. Dobra Serica area Inferred due to interpretation change and poor comparison of historic data with no QAQC to recent data with QAQC. Indicated 10 mx 10 m to 20 m x 20 m Leviathan North Inferred 40 m x 40 m to 80 m x 80 m Mt Goodes Basalt and Dolerite/Gabbro host rock, gold mineralisation associated with shears and quartz veins, overlying supergene zone. Indicated 20 m x 20 m to 40 m x 40 m Notes: a) Geological considerations include continuity and grade b) ²Resource classification is based on geological continuity, grade continuity, drill hole/sample spacing, sample data quality, estimation quality, mining development (amount of exposed and mapped mineralisation) and mining history. The Measured category also requires adjacent face sampling and mapping. c) The Qualified person is of the opinion that the estimation follows good practice and reduces estimation bias. Source: Agnew CPR 2021 The estimation of resources for both underground and open pit operations is based on exploration and sampling information gathered through appropriate techniques, primarily from diamond drilling and RC drilling. The locations of sample points are spaced close enough to deduce or confirm geological and grade continuity. Generally, drilling is undertaken on grids, which range between 10 metres by 25 metres for measured resources and up to 40 metres by 40 metres typically for indicated resources, although this may vary depending on the continuity of the orebody. In underground operations mapping and sampling of development facies is used to supplement drilling information. Due to the variety and diversity of mineralisation at the Australian operations, sample spacing may also vary depending on each particular ore type The Qualified person is of the opinion that: a) Inferred Mineral resource has an even chance of converting to indicated Mineral resource with continued exploration, additional empirical data and evolving geoscientific modelling. b) The Mineral resource demonstrates reasonable prospects for economic extraction over the indicated study time frame c) The Mineral resource gold price of $1,500/oz is at a 15 % premium to the reserve price with the differential being in general alignment with Gold Fields standard practice for setting Mineral resource price. The 15 % premium is to provide information on Agnew resource potential at higher gold prices and to indicate possible future site infrastructure, permitting, licencing, SLO, mining footprint and infrastructure requirements.
P a g e 79 | 138 d) The Qualified person’s opinion is that, whilst effort and care are taken with the resource estimation and classification processes, increase in geological knowledge and available data will reduce the level of uncertainty, and therefore some inherent uncertainty will remain.
P a g e 80 | 138 11.2 Mineral resources as of 31 December 2021 The Agnew Mineral resources exclusive of Mineral reserves as of 31 December 2021 are summarized in Table 11.2.1. The Mineral resources are 100 % attributable to Gold Fields and are net of production depletion up to 31 December 2021. The point of reference for the Mineral resources is in-situ with dilution applied to the mine shape optimizer or MSO. Table 11.2.1: Agnew - summary of gold Mineral resources at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,500/oz Mineral resources (exclusive of Mineral reserves) Cut-off Grades (g/t Au) Metallurgical Recovery (%) Amount/ (kt) Grades/ (g/t Au) Amount/ (koz Au) Underground Mineral resources UG Measured Mineral resources 107 5.8 20 2.15 to 4.07 94.04 UG Indicated Mineral resources 6,114 5.3 1,043 2.15 to 4.07 94.04 UG Measured + Indicated Mineral resources 6,221 5.3 1,063 2.15 to 4.07 94.04 UG Inferred Mineral resources 6,888 4.6 1,027 2.15 to 4.07 Open pit Mineral resources OP Measured Mineral resources OP Indicated Mineral resources 1,980 2.7 173 0.76 to 0.93 94.99 OP Measured + Indicated Mineral resources 1,980 2.7 173 0.76 to 0.93 94.99 OP Inferred Mineral resources 751 3.5 86 0.76 to 0.93 93.44 Stockpile Mineral resources SP Measured Mineral resources SP Indicated Mineral resources SP Measured + Indicated Mineral resources SP Inferred Mineral resources Total Agnew Mineral resources Total Measured Mineral resources 107 5.8 20 Total Indicated Mineral resources 8,093 4.7 1,216 Total Measured + Indicated Mineral resources 8,200 4.7 1,236 Total Inferred Mineral resources 7,639 4.5 1,112 Notes: a) Rounding of figures may result in minor computational discrepancies. b) Mineral resources are exclusive of Mineral reserves. c) No year-on-year Mineral resource comparison is presented as Agnew did not disclose a Mineral resource in 2020. d) Quoted as diluted in situ metric tonnes and grades. Metallurgical recovery factors have not been applied to the Mineral resource estimates. The approximate metallurgical recovery factor is 94.04 % for underground. The metallurgical recovery is the ratio, expressed as a percentage, of the mass of the specific mineral product recovered from ore treated at the process plant to its total specific mineral content before treatment. Agnew mining operations vary according to the mix of the source material (e.g., oxide, transitional, fresh and ore type blend). e) The metal prices used for the 2021 Mineral resources are based on a gold price of $1,500 per ounce or A$2,000 per ounce (at an exchange rate of A$1:$0.75). Open pit Mineral resources at the Australian operations are based on revenue factor 1 pits and the underground Mineral resources on appropriate mine design and extraction schedules. The gold price used for Mineral resources approximates 15 % higher than the selected Mineral reserve. f) The cut-off grade may vary per shaft, open pit or underground mine, depending on the respective costs, depletion schedule, ore type, expected mining dilution and expected mining recovery. The average or range of cut-off grade values applied to the Mineral resources are: Agnew 2.15 g/t to 4.07 g/t Au mill feed (underground) and 0.76 g/t to 0.93 g/t Au mill feed (open pit). g) The Mineral resources are based on initial assessments at the resource gold price of $1,500/oz and consider estimates of all Agnew costs, the impact of modifying factors such as mining dilution and mining recovery, processing recovery and royalties. Mineral resources are also tested through the application of Environmental, Social and Governance (ESG) criteria to demonstrate reasonable prospects for economic extraction. h) The Mineral resources are estimated at a point in time and can be affected by changes in the gold price, US Dollar currency exchange rates, permitting, legislation, costs and operating parameters. Source: Agnew CPR 2021
P a g e 81 | 138 The Mineral resources are based on initial assessments at the resource gold price of $1,500/oz and consider estimates of all Agnew costs, the impact of modifying factors such as mining dilution and recovery, processing recovery and royalties to demonstrate reasonable prospects for economic extraction. 11.3 Audits and reviews The 31 December 2020 Mineral resource estimate was externally audited by external and independent consultant Optiro, who concluded that the Mineral resource was generated, classified and reported to the appropriate technical standard with no material areas of non-compliance identified. The best practices employed were carried over into the 31 December 2021 estimate. External Mineral resource and reserve audits are performed on a rolling three-year cycle. The Mineral resource estimate was also subjected to internal review and scrutiny by the relevant Qualified persons and regional technical and financial disciplines, and peer reviewed for technical assurance and compliance in reporting by Gold Fields’ Corporate Technical Services (CTS), Sustainable Development and Head Office Finance teams. The Mineral resource estimate is underpinned by appropriate Mineral resource management processes and protocols to ensure requisite corporate governance in respect of the intent of the Sarbanes-Oxley Act of 2002 (SOX). Technical and operating procedures developed for Agnew are designed to be compliant with the SOX framework and risk assessment control matrix (RACM) as adopted by Gold Fields for Mineral resource and Mineral reserve estimation, reporting and auditing. Gold Fields uses K2Fly RCubed® propriety software in combination with SharePoint® to ensure accuracy, governance, auditability and security in the reporting of Mineral resources and Mineral reserves. 11.4 Comparison with 31 December 2020 Mineral resource No Resources were disclosed in 2020 Resources have not been reported on this stock exchange previously, however, in the Qualified persons opinion the 2021 to 2020 resource comparison changes are not material.
P a g e 82 | 138 12 Mineral reserve estimates 12.1 Level of assessment Agnew’s Mineral reserves are that portion of the Mineral resources which, as technical and economic studies have demonstrated, can justify extraction as at 31 December 2021. The Mineral reserves are based on appropriately detailed and engineered life of mine plans and are supported by relevant studies completed to a minimum pre-feasibility study level. The life of mine plans are based on measured and indicated Mineral resources converted through the application of appropriate modifying factors to derive Mineral reserves estimates A pre-feasibility study has an estimated accuracy for operating and capital costs of ±25 % with a contingency of no more than 15 %. All mine design and scheduling is completed by experienced engineers using appropriate mine planning software and incorporates relevant modifying factors, cut-off grades and the results from other techno-economic investigations. Mining rates, fleet productivities, operational and plant capacities and constraints are accounted for in the plan and are typically based on historical performance trends. All geotechnical protocols and constraints are accounted for in the plan, including the provision for suitable mining geometries, mining losses, mining recovery and dilution. Provision is also made for sufficient waste rock and tailings storage with plans in place to meet the life of mine requirements. The Company’s mine closure plans comply with in-country legal requirements and are approved by the regulator. Integrated mine closure plans provide appropriate cost parameters for operational and life of mine planning as well as end of life mine closure commitments. The Mineral reserve includes “incrementally costed” material to ensure the Agnew processing facility is operating at full capacity for the full life of the operation. The mining of this material covers the full cost of mining, variable costs of processing, administration, closure and rehabilitation, and positively contributes to covering fixed site overhead costs. The inclusion of incrementally costed material within the mine plan is viable at Agnew based on the following assumptions: The operation is mine constrained. The mining of incremental material does not extend the life of the overall operation. New projects will not be delayed due to lack of processing feed and capacity. Analysis has been completed to understand the nature of the fixed and variable costs of processing. Analysis has been completed that shows the positive cashflow contribution for this reserve. Time-based economics have been undertaken to show the positive NPV contribution. The point of reference for the Mineral reserves is ore delivered to the processing facility, also known as the run-of- mine or RoM. The Qualified person’s opinion of the 2021 Mineral reserve estimates is: (a) The modifying factors are based on recent mining and processing extraction history and performance and are reasonable and appropriate to derive the reserves from the resources and minimize any estimation errors. The modifying factors are aligned with leading industry technical practice, for example, blended process recovery is used in the reserve estimate. (b) Agnew has grown its Mineral reserves over the past three reporting cycles net of depletion. Infrastructure, environmental, permitting, closure, utilities and baseline studies are all aligned to support continued Mineral reserves growth. Agnew’s proactive study pipeline retains a focus on progressing all key work integral to supporting ongoing life of mine extensions so as to avoid any potential production delays. For example, a study has been commissioned to extend tailings storage capacity in TSF 4.
P a g e 83 | 138 (c) The indicated and measured Mineral resource is sufficient in geoscientific confidence to complete final life of mine designs. However, it is usual to complete a final phase of infill drilling to determine a high confidence ‘mine defined’ resource with detailed geoscientific information prior to final stope design, pillar layouts and detailed production scheduling. (d) The reported reserve is a ‘point in time’ or snapshot of the life of mine plan as at 31 December 2021. It is supported by a technically valid and economically viable mine design and schedule combining open pits and three underground mines. The techno-economic work does not exceed the estimated accuracy of ±25 % and or require more than 15 % contingency for both operating and capital costs. (e) Environmental compliance and permitting requirements have been assessed in detail with supporting baseline studies and relevant preliminary internal impact assessments completed. In addition, detailed tailings deposition, waste disposal, reclamation, and mine closure plans are incorporated into the life of mine plan. (f) The life of mine plan is completed to a minimum pre-feasibility level of study, although certain components of the plan have been completed to a feasibility level of study. 12.2 Mineral reserve estimation criteria 12.2.1 Recent mine performance Agnew’s recent underground performance is summarized in Table 12.2.1. There has been no open pit mining at Agnew since 2012. Table 12.2.1: Agnew – recent operating statistics Units 2021 2020 2019 Waroonga Ore development m 2,339 2,649 2,620 Waste development m 7,602 5,188 4,890 RoM ore mined kt 754 774 728 New Holland Ore development m 1,695 1,824 2,025 Waste development m 2,335 3,265 3,491 RoM ore mined kt 374 530 555 Total Agnew (mined) Ore development m 4,034 4,473 4,645 Waste development m 9,938 8,454 8,381 Waste mined kt 893 753 768 Waste mined – operating kt 236 258 236 Waste mined – capital kt 657 495 442 RoM ore mined kt 1,128 1,304 1,283 Processing Tonnes milled kt 1,254 1,357 1,231 Grade milled g/t Au 5.5 5.3 5.5 Processing recovery % 95.0 94.6 94.2 Gold produced koz 223 233 219 kg 6,936 7,256 6,824 Financials Average gold price received $/oz 1,802 1,762 1,387 Exchange rate annual average $/A$ 0.75 0.69 0.70 Cash cost of sales before amortisation and depreciation $/oz 774 993 1,045 Capital expenditure $ million 88 52 76 $/oz 395 223 349 All in Cost (AIC) $/oz 1308 1,053 1,152 Notes: a) The operating statistics are based on annual fiscal year measurements Source: Agnew CPR 2021
P a g e 84 | 138 12.2.2 Key assumptions and parameters The assumptions and parameters considered in the Mineral reserve estimate are summarized in Table 12.2.2. Table 12.2.2: Agnew – Summary of material modifying factors Units 2021 2020 2019 Mineral resource modifying factors Mineral resource gold price $/oz 1,500 1,500 1,400 Exchange rate annual average $/A$ 0.75 0.75 0.76 Cut-off grade range - underground resources g/t Au 2.2 – 4.1 2.3 – 3.9 2.5 – 3.8 Cut-off grade range - open pit resources g/t Au 0.76 – 0.93 0.77 – 0.95 0.83 – 0.95 Mineral reserve modifying factors Mineral reserve gold price $/oz 1,300 1,300 1,200 Exchange rate annual average $/A$ 0.74 0.74 0.75 Processing capacity Mtpa 1.3 1.3 1.3 Cut-off grade range - underground reserves g/t Au 2.6 – 4.6 2.6 – 4.4 2.85 – 4.4 Cut-off grade range - open pit reserves g/t Au 0.85 – 1.04 0.77 – 0.95 0.83 – 0.95 Mining dilution - underground % 13 – 30 14 – 29 24 Mining dilution - open pit % 11 – 55 2 – 39 24 Mining recovery underground % 70 – 93 70 – 93 80 – 95 Mining recovery open pit % 72 – 88 87 – 96 83 Mine Call Factor (MCF) % 100 100 100 Process plant recovery factor % 93.4 93.3 93.3 Notes: b) The 2021 fiscal modifying factors are valid as at 31 December 2021 c) The cut-off grades are the lowest grade of mineralized rock which determines as to whether it is economic to recover its gold content by further concentration, calculated as per the Gold Fields cut-off grade guidance on methodology and protocol; see Section 11.1.10 for more information on cut- off grade calculation methodology d) The metal prices selected are the same for the past two annual reserve and resource estimates e) Relevant modifying factors are reported in ranges and vary based on open pit and underground extraction and estimated unit costs for depth and distance hauled Source: Agnew CPR 2021 Operating expenditures comprise: Cash Cost Components: these include direct mining costs, direct processing costs, direct G&A (general and administration) costs, consulting fees, management fees, transportation and realization charges. Total Cash Costs: these include additional components such as royalties (excluding taxes where appropriate). Total Working Costs: these include terminal separation liabilities, reclamation and mine closure costs (the net difference between the total environmental liability and the current trust fund provision) but exclude the salvage value on closure and non-cash items such as depreciation and amortization. Total Costs: these include total working costs plus net movement in working capital plus capital expenditure. Major Capital Projects: In addition to long-term capital projects, the life of mine capital expenditure programmes generally include detail based on approved expenditure programmes. Mining costs are underground mining costs and surface sources costs, including ore handling costs. Mining costs are based on unit rates for the preceding 6 to 12 months actual snapshot, applied to the planned physicals, with alignment to the key cost centres driving the operating costs. Processing costs include tailings and waste disposal costs, as well as the cost of maintaining key on-mine infrastructure. G&A costs are largely based on the required and necessary technical and administrative support services required to sustain current and future mining production. In most instances these are assigned with fixed and variable cost components per tonne of ore within both the reserve estimation and corresponding financial models. Corporate costs are assigned as variable with ounces sold in the financial model.
P a g e 85 | 138 Table 12.2.3: Agnew Unit cost Input Variable Units Waroonga New Holland Mass- Troy Ounces to Grams g/oz 31.1035 31.1035 Exchange Rate - AUD to USD AUD/USD 0.74 0.74 Reserve Gold Price USD USD/oz 1300 1300 AUD AUD/oz 1750 1750 WA State Govt Royalty % 2.5 2.5 Reserve Realised Gold Price $/oz 1,262.66 1,262.66 On Site Administration Variable Costs $/ t ore 10.0 10.0 Costs $/ t ore 9.5 9.5 Processing Variable Cost $/ t ore 20.8 20.8 Total Cost $/ t ore 20.8 20.8 Sustaining Capital and TSF $/ t ore 0.5 1.6 Total Cost including Sustaining Capital $/ t ore 21.4 22.5 Infrastructure Capital Costs (Project) $/ t ore 9.3 3.1 Surface Cartage Cost Mine to Mill $/ t ore 3.7 4.3 Mining Overhead Variable Cost $/ t rock 16.7 19.1 Cost Total $/ t rock 16.7 19.1 Lateral Development Cost per metre - High $/ m adv 5,838 2,791 Cost per metre - Low $/ m adv 2,833 1,745 Vertical Development Cost per metre - Average $/ m adv 4,182 4,182 Production Drilling stope t/drill m 3.1 4.4 Drilling 89 mm Holes $/ prod drill m 49.5 35.6 Blasting $/ t stope ore 4.9 4.1 Stope Bogging - Remote $/ t stope ore 5.8 7.8 Stope Cable Bolting $/ m cable bolt Backfill $/ m³ 40.6 49.3 Haulage $/ tkm 1.8 1.0 Operating Diamond Drill Cost per metre $/ diamond drill m 120.3 118.9 Mining Sustaining Capital $/ t ore 5.1 2.6 Mining Infrastructure Capital Costs $/ t ore 1.1 0.2 Site Infrastructure Capital Costs $/ t ore 1.6 1.8 Leasing Liability PROCESSING $/ t ore 2.1 2.1 PROCESSING 50 % $/ t ore 1.0 1.0 NEW HOLLAND $/ t ore 1.7 1.7 WAROONGA $/ t ore 2.4 2.4 TOTAL $/ t ore 6.1 6.2 Source: Agnew CPR 2021 The terminal benefits liabilities are not included in overhead costs as per Company policy and directives. Rehabilitation and appropriate mine closure costs are included following completion of mining. Capital expenditure estimates beyond the next two years are based on pre-feasibility estimates for infrastructure and development requirements for individual projects, and unit-rate average historical costs where applicable. A pre- feasibility study has an estimated accuracy for operating and capital costs of ± 25 % with a contingency of no more than 15 %. Details of the forecast operating, and capital expenditures are provided in Section 18. As disclosed in Section 11.1.10, Gold Fields conducts an annual review of metal prices for Mineral resource and Mineral reserve reporting to monitor any significant changes that would warrant re-calibrating the price deck for strategic, business or life of mine planning purposes. This review considers prevailing economic, commodity price and
P a g e 86 | 138 exchange rate trends, together with market consensus forecasts and Gold Fields’ strategy and expectations for the mine operations. The Mineral reserve gold price of $1,300/oz is detailed in particularity in Chapter 16 Marketing. The Qualified person is of the opinion that the gold price applied to the estimation of the Mineral reserves is reasonable and suitable for life of mine planning and is an appropriate reflection of recent historical trends and importantly provides a metal price that mitigates the risk of short to medium term price fluctuations with the potential to impact on the execution of the life of mine reserve plans. The gold price used provides a reasonable long-term delta to current spot prices and incorporates into the life of mine plan appropriate contingency to offset possible short term lower price cycles. For the operating mines, 6 to 18 month trailing average actual costs form the basis of the unit rates applied to the reserve financial model, with consideration for expected variations in operating and capital costs. This timeframe is selected based on alignment with recent business planning data. For new mines, costs are based on estimates from a range of recent sources and are deemed appropriate and representative by the Qualified person. The Mineral reserve estimates may be materially affected based on changes to the cost and price assumptions, in addition to changes in the modifying factors. The reserve is assessed at multiple scales, including individual stope or pit, level, orebody, mine, and operation. As such, the Qualified person is of the opinion that the reserve plan should be viewed as a consolidated entity, as removal of key components of the reserve may have a material and disproportionate impact on the overall value and viability of the plan. In addition to changes to modifying factors, additional data acquired into the future may materially impact the reserve estimate. Examples include, but are not limited to, acquisition of additional drilling data, changes to interpretation of the data, mining studies, internal and external approvals and operating strategies. 12.2.3 Cut-off grades Cut-off grades are influenced by the operating strategy, cost base and design and scheduling, and are therefore calculated annually in alignment with the Gold Fields cut-off grade guideline. The purpose of the guideline is to ensure consistency in the cut-off definitions and cut-off processes across all company properties. Cut-off grades are not only calculated globally for a mining operation, but also for separate ore deposits and mining areas dependent on various factors such as ore type, mining method, haul distances, recoveries and the mining, processing and general and administration costs. Open pit The cut-off grades used for the open pit Mineral reserves are calculated using the same methodology described in Section 11.1.10 at the reserve gold price of $1,300/oz. The cut-off grades by deposit are summarized in Table 12.2.4.
P a g e 87 | 138 Table 12.2.4: Agnew open pit reserve cut-off grades Area Reserve shell revenue factor selected Reserve cut-off grade (g/t Au) RoM Expected process recovery (%) Maria South 1.3 0.88 98 450 South 1 0.85 96 Barren Lands 2 0.86 96 Hidden Secret Complex 1 0.88 96 Notes: a) The cut-offs are estimated based on the reserve price, reserve modifying factors and are not expected to change materially over the life of mine reserve b) The cut-off grades, price and modifying factors are incorporated in the estimation of the reserve shell c) The Qualified person is of the opinion that the design of the selected reserve shells used in the reserve estimation minimize estimation errors Source: Agnew COG Report, 2021 Underground The cut-off grades used for the underground Mineral reserves are calculated using the same methodology described in Section 11.1.10 at the reserve gold price of $1,300/oz. The cut-off grades by deposit are summarized in Table 12.2.5. Table 12.2.5: Agnew underground reserve cut-off grades Area Reserve cut-off grade (g/t Au) RoM Expected process recovery (%) Minimum mining width (m) Waroonga underground Kim South - Lower 4.7 95 3.0 Edmunds 3.6 96 3.0 FBH - Upper 3.9 88 3.0 FBH - Mid 3.8 88 3.0 FBH - Lower 3.8 88 3.0 Main / Main South / Rajah 4.4 86 3.0 Waroonga North 4.3 93 3.0 Kath Lower 3.8 93 3.0 Kath Upper / Kath North 3.6 93 3.0 New Holland and Redeemer underground Genesis 2.7 96 3.0 New Holland 3.0 96 3.0 Sheba 2.7 96 Room Pillar 4.0 Cinderella 3.1 90 3.0 Himitsu 2.6 96 3.0 Redeemer Zone 2 2.9 90 3.0 Redeemer North 3.3 89 3.0 Barren Lands 3.1 92 2.0 Notes: a) The underground cut-offs are estimated based on the reserve price, reserve modifying factors and are not expected to change materially over the life of mine reserve b) The estimated cut-off grades are adjusted for increased unit costs associated with mining depth and ground support type costs c) The Qualified person is of the opinion that the life of mine schedule contains sufficient diligence to minimize estimation errors Source: Agnew COG Report, 2021 12.2.4 Mine design The active mining areas at Waroonga and New Holland use modern mechanized mining equipment, with long-hole drill and blast, and truck haulage via declines to surface. Waroonga is predominantly mined using open stoping with cemented paste fill. New Holland is predominantly mined using inclined room and pillar with long-hole open stoping. Both mines are operated with dedicated mining teams, under a single site management structure. Open pit mining is planned to be by conventional drill and blast, with truck and shovel operations. Further details on the mining methods are provided in Section 13.
P a g e 88 | 138 Open pit Open pit planning entails the input of economic parameters and physical constraints into mining optimization software to generate a series of nested pits from which an optimal shell is selected. Detailed design is undertaken to confirm the extraction plan for the optimal shell. The process is iterated until an acceptable level of correlation is achieved between the optimal shell and the detailed pit design. The open pit slope parameters or wall angles are based on comprehensive assessment of all available engineering geology and geotechnical information, including weathering, rock mass strength, frequency and orientation of fracturing and rock mass characterization. Underground Mining access infrastructure and stoping methods are largely determined by the geometry of the mineralized zones and the evaluation involves review of more than one method to determine the preferred capital and operating expenditure schedules and optimal mining economics. The primary technical constraints underground are the geotechnical extraction sequence, number of active work areas, ventilation and paste fill. Careful assessment of all mining rates, capacities and constraints supports the integrated scheduling of production activities to enable effective mine plan delivery. The 2021-2022 primary ventilation fan upgrades are a key enabler to ensure appropriate cooling capacity for the life of mine plan and as mining depth progresses deeper. Currently Waroonga has four primary ventilation intakes (Main decline, Kim decline, Main and Kim fresh air rise network), and two primary exhausts (Kim and Main return air rise network). Ventilation intake and exhaust is managed to accommodate the use of truck haulage at depth. Fresh air is used to reduce the temperature of the workings. Reserve plan ventilation requirements are reviewed using VentSim® modelling. The modelling allows for detailed designs, particularly in relation to vent raise and vent drive dimensions, with cooling capacity matched with fleet engine size. The ventilation districts change over the mine life, and this modelling assists with evolving the capacities and managing reserve scheduling based on ventilation constraints. New Holland is physically constrained by the number of available high-grade work areas, with production focused on stoping in Sheba from 2020. Other areas of the mine are continually reviewed as incremental mining opportunities while the operation remains mine constrained due to haulage via a single decline and while there is spare mill capacity. Currently New Holland has three intake airways (Genesis decline, New Holland decline, Genesis air rise network) and two primary exhausts (Cinderella return and Genesis 500 return air rise). Redeemer Zone 2 and Barren Lands are new underground mines with much of the capital costs associated with the surface set-up (communications, workshop, site offices, pond, pumping, electrical) and underground infrastructure (raw water supply, dewatering, compressed air). The primary technical constraints at Redeemer Zone 2 include the potential hydraulic connection between tailings storage facility 3 and the Redeemer Zone 2 orebody. Stand-off distances from the former Redeemer mine of 130 m are currently being applied. Primary ventilation and secondary egress to the mine will be established from surface and positioned northwest of the Redeemer waste rock dump. A fresh air raise and return air raise connected to the top of the mine will serve as the primary ventilation system. The fresh air connects to the decline and serves as the secondary egress. 12.2.5 Mine planning and schedule The company’s annual mine planning process is anchored by a corporate planning calendar that sets out the sequence of events to be followed that ensures a strong linkage between the strategic planning phase and the life of mine plan itself that defines the Mineral reserves. During the first half of the year the preferred strategic plan is confirmed and approved by the company Executive Committee. This provides guidance for required investment and business and operational planning to position the mine to deliver on the strategic intent for the property. The detailed two-year
P a g e 89 | 138 operational plan and budget is informed by financial parameters determined by the Executive Committee and is the anchor to the longer-term planning and equates to the first two years of the life of mine plan. The overall planning process schedules key work to be completed and stage gated before subsequent work can be continued and includes the metal prices, geology and estimation models, resource models, mine design, depletion schedules, environmental and social aspects, capital and operating costs and finally the cash flow model and financial valuation. Capital planning is formalized pursuant to Gold Fields’ capital investment and approvals process. Projects are categorized and reviewed in terms of total expenditure, return on investment, net present value (NPV) and impact on All-in Costs (AIC) per ounce and all projects involving amounts exceeding $40 million are submitted to the Board for approval. Material changes to the plans are referred back to the Executive Committee and the Board. Post- investment reviews are conducted to assess the effectiveness of the capital approvals process and to leverage continuous improvement opportunities going forward. The Mineral reserve estimates are based on an appropriately detailed and engineered life of mine plan that is supported by relevant studies completed to a minimum PFS level of work. All design and scheduling is completed by experienced engineers using appropriate mine planning software and incorporates all relevant modifying factors, the use of cut-off grades and the results from other techno-economic investigations. Mining rates, fleet productivities and all key operational and plant capacities and constraints are accounted for in the plan and are typically based on historical performance trends. All geotechnical protocols and constraints are accounted for in the plan, including the provision for suitable mining geometries and ground support, mining losses in pillars, mining recovery and dilution. The provision of sufficient waste storage and tailings capacity is engineered into the plans to meet the life of mine requirements. Mine planning is driven primarily by personnel at the mine who are best positioned to determine the technical and commercial objectives for the site based on the parameters, objectives and guidelines issued by the corporate office. The site-based planning is supported by regional technical services functions, as well as from corporate technical services (CTS) and the corporate finance and sustainable development teams which provide overall oversight and assurance. Open pit Open pit mine design and scheduling is based on 3D Mineral resource block models. The ore is assigned to selective mining unit SMU mining shapes based on equipment size and practical selectivity. The selective mining unit SMUs are accumulated into ore dig plans. The selected pit shells are subjected to detailed mine design and extraction sequencing to optimize the waste: ore strip ratio and with benches recovering ore above the reserve cut-off grade. The access ramps are ideally placed to minimize ore loss below the ramp and can be outside the selected shell. The open pits are sequenced to derive the best possible integrated plan and to blend feed to the plant to assist with life of mine tail end management. The open pits are mined by a single contractor. Underground Underground mine schedules are based on 3D block Mineral resource models (inventory models), with allowances made for minimum mining widths, dilution and ore loss appropriate to the mining method being considered and geotechnical considerations. Historical performance measures are considered in determination of these modifying factors. Underground mining equipment availability and utilization data are collated as part of the scheduling and equipment allocation process (
P a g e 90 | 138 Table 12.2.6). Actual and planned equipment availability ranges from 80 % to 90 % for most machinery. The required equipment utilization is generally between 60 % and 82 %. Availability and utilization are based on calendar hours.
P a g e 91 | 138 Table 12.2.6: Agnew - Open pit and underground and mining equipment Equipment type Waroonga New Holland Redeemer and Barren Lands Open pits Trucks 9 3 3 4 Loaders 7 3 3 2 Blast hole drill rigs 2 2 3 2 Development drill rigs 4 2 4 NA Notes: a) The estimated mining equipment fleet is expected to vary over the life of mine based on the open pit to underground mining ratios b) The heavy mobile equipment fleet is renovated based on manufacturers specification or on regular maintenance records c) The Qualified person is of the opinion that the prescribed mining fleet supports the life of mine reserve Source: Agnew CPR 2021 A time-based economic evaluation is undertaken of the completed mining and processing schedule to ensure economic viability over the reserve life with the requisite rehabilitation and end of life mine closure costs also incorporated into the financial assessment. Provided that individual mining areas cover the direct mining costs (capital and operating), variable processing, tailings storage facilities, rehabilitation and on-site administration costs, contribute to overhead fixed costs, and do not increase the overall life of the operation (i.e., mine constrained), the material can be included in the reserve estimate. Refer to Section 19.1 for details on the life of mine schedule. The Qualified person is of the opinion that the mine plan and schedule incorporate appropriate assessment of all relevant technical, environmental, social and financial aspects to ensure the Mineral reserve complies with the SK rule instructions and requirements. After reasonable assessment there is no unresolved material matter that could have a significant impact on the mines ability to execute the life of mine plan. The mine plan and schedule incorporate consideration of the following key criteria: Production depletion up to 31 December 2021 Application of cut-off grades to determine mineable ore Application of appropriate modifying factors to convert resource to reserve Allocation of suitable mining equipment and costs Incorporation of realistic mining rates and efficiencies Practical and realistic mine design and mining methods Integrated production scheduling taking account of capacities, constraints and bottlenecks Use of appropriate paste filling rates for stope voids Integrated project management and execution Security of water and energy for the life of mine Provision for mine rehabilitation and mine closure costs Consideration of all environmental, social and legal aspects to enable life of mine plan execution Appropriate life of mine tail end management Security of current and future land tenure and relevant leasing agreements, permits and licences Life of mine cash flow model and economic viability
P a g e 92 | 138 12.2.6 Processing schedule The processing schedule is derived from the Mineral reserve schedule. The ore is blended from the open pits and three underground mining areas. The individual ore type recovery formulas as detailed in Section 10.2 are used in the mine schedule to aggregate into an overall processing recovery. Refer to Section 19.1 for details on the life of mine processing schedule. 12.2.7 Classification criteria Agnew’s Mineral reserves are classified as either proven or probable in accordance with the definitions in Subpart 229.1300 of Regulation S-K. The estimation of reserves for both underground and open pit operations is based on exploration and sampling information gathered through appropriate sources, primarily from DD, RC, AC and sonic drilling techniques. The locations of sample points are spaced close enough to deduce or confirm geological and grade continuity. Generally, drilling is undertaken on grids, which range between 10 m by 25 m for proven Mineral reserves and up to 40 m by 60 m typically for probable Mineral reserves, although this may vary depending on the type and continuity of the orebody. In underground operations, mapping and sampling of development excavations where the orebody is exposed is used to supplement the initial drilling information. Where required supplementary close spaced mine definition drilling (infill) is undertaken to enable final detailed production design and extraction sequencing. At Agnew, a proven Mineral reserve is also assigned if it is flagged as a measured Mineral resource and if the reserve block is covered by sufficient infill drill holes and/or exposed development face mapping. A probable Mineral reserve is assigned if it is flagged as an indicated Mineral resource, is only covered by exploration / resource definition drill holes and has no development face mapping. Mineral reserve statements include only measured and indicated Mineral resources modified to produce Mineral reserves contained in the life of mine plan. 12.2.8 Economic assessment The basis for establishing economic viability is discussed in Section 19.
P a g e 93 | 138 12.3 Mineral reserves as of 31 December 2021 The Agnew Mineral reserves as of 31 December 2021 are summarized in Table 12.3.1. The Mineral reserves are 100 % attributable to Gold Fields and are net of production depletion up to 31 December 2021. The point of reference for the Mineral reserves is ore delivered to the processing facility. Table 12.3.1: Agnew - summary of gold Mineral reserves at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,300/oz Amount/ (kt) Grades/ (g/t Au) Amount/ (koz Au) Cut-off Grades (g/t Au) Metallurgical Recovery (%) Underground Mineral reserves UG proven Mineral reserves 6 5.5 1 2.6 to 4.6 94.04 UG probable Mineral reserves 4,712 6.4 966 2.6 to 4.6 94.04 UG total Mineral reserves 4,718 6.4 967 2.6 to 4.6 94.04 Open pit Mineral reserves OP proven Mineral reserves - - OP probable Mineral reserves 408 3.3 43 0.85 to 0.88 94.99 OP total Mineral reserves 408 3.3 43 0.85 to 0.88 94.99 Stockpile Mineral reserves SP proven Mineral reserves 13 8.0 3 0.9 – 0.99 93.44 SP probable Mineral reserves SP total Mineral reserves 13 8.0 3 0.9 – 0.99 93.44 Total Mineral reserves Total proven Mineral reserves 19 7.2 4 Total probable Mineral reserves 5,120 6.1 1,009 Total Agnew Mineral reserves 2021 5,138 6.1 1,013 Total Agnew Mineral reserves 2020 5,292 5.4 917 year-on-year difference (%) -3% 14% 11% Notes: a) Rounding of figures may result in minor computational discrepancies. b) Refer to Table 12.5.1 for year-on--year Mineral reserve comparison. c) Quoted as mill delivered metric tonnes and run-of-mine grades, inclusive of all mining dilutions and gold losses except metallurgical recovery. Metallurgical recovery factors have not been applied to the reserve figures. The approximate metallurgical recovery factor is 93.44 %. The metallurgical recovery is the ratio, expressed as a percentage, of the mass of the specific mineral product recovered from ore treated at the process plant to its total specific mineral content before treatment. The recoveries for Agnew vary according to the mix of the ore source material (e.g., oxide, transitional, fresh and ore type blend) and method of treatment. d) The metal prices used for the 2021 LoM Mineral reserves are based on a gold price of $1,300 per ounce or A$1,750 per ounce (at an exchange rate of A$1:$0.74). Open pit Mineral reserves at Agnew are based on optimized pits and the underground operations on appropriate mine design and extraction schedules. e) Dilution relates to planned and unplanned waste and/or low-grade material being mined and delivered to the process plant. Ranges are given for those operations that have multiple orebody styles and mining methodologies. The mine dilution factors range from 11 % to 55 % (open pit) and 13 % to 30 % (underground). f) The mining recovery factor relates to the proportion or percentage of ore mined from the defined orebody at the gold price used for the declaration of Mineral reserves. This percentage will vary from mining area to mining area and reflects planned and scheduled reserves against actual tonnes, grade and metal mined, with all modifying factors, mining constraints and pillar discounts applied. The mining recovery factors range from 70 % to 93 % (underground) and 72 % to 88 % (open pit). g) The cut-off grade may vary per open pit or underground mine, depending on the respective costs, depletion schedule, ore type, expected mining dilution and mining and metallurgical recoveries. The average or range of cut-off grade values applied in the planning process are: Agnew 2.6 g/t to 4.6 g/t Au mill feed (underground) and 0.85 g/t to 0.88 g/t Au (open pit). h) A gold based Mine Call Factor (gold called for over gold accounted for) determined primarily on historic performance but also on realistic planned improvements where appropriate, is applied to the Mineral reserves. A Mine Call Factor of 100 % has been applied at Agnew. i) The Mineral reserves are estimated at a point in time and can be affected by changes in the gold price, US Dollar currency exchange rates, permitting, legislation, costs and operating parameters. j) Agnew is 100 % attributable to Gold Fields and is entitled to mine all declared material located within the property's mineral leases and all necessary statutory mining authorizations and permits are in place or have reasonable expectation of being granted. Source: Agnew CPR, 2021
P a g e 94 | 138 The Agnew Mineral reserves are the economically mineable part of the measured and indicated Mineral resources based on life of mine schedules and pre-feasibility studies completed at the reserve gold price of $1,300/oz to justify their economic viability at 31 December 2021 (refer to Section 19 for details on the supporting economic analysis). 12.4 Audits and reviews Audits and reviews completed at Agnew during 2020 and 2021 included: Site based internal peer reviews, validation and reconciliation of geology models, geology wireframes, estimation process and outputs with senior geology staff and department heads. Ongoing routine drilling, sampling and geology audits and coaching of all staff by senior geologists and department heads to ensure due process and SOX risk assessment control matrix compliance. Corporate technical services audits and review of geology, estimation and mine planning models. Gold Fields’ Group Geology and Planning technical team reviews and site visits for validation and compliance evaluation of resources and reserves process, protocol and output. ISO14001 surveillance audit by recognized external auditors. ISO45001 surveillance audit by recognized external auditors. ISO27001 certification. Tailings storage facilities annual dam safety inspection. Global Industry Standard on Tailings Management (GISTM) programme, supported by third party (CMW). Ongoing routine internal audits (Gold Fields’ Internal Audit). Annual external financial audits (KPMG to 2018, PWC from 2019). Internal legal compliance and ethics policy review. Internal SOX compliance (Perth and Corporate auditors, including 2020 audits). External Mineral resource and Mineral reserve audit by Optiro Consulting. No adverse findings or any non-compliances were recorded from any of the audits. Ongoing compliance with minor improvement, adjustments and best practice continue to be implemented. Records of audits are filed electronically on site in relevant departments and folders with major audit signoffs reported in the Gold Fields annual report. 12.5 Comparison with 31 December 2020 Mineral reserve The net difference in Mineral reserves between 31 December 2020 and 31 December 2021 is +96 k oz Au or +11 % (Table 12.5.1). Table 12.5.1: Net difference in Mineral reserves between 31 December 2020 and 31 December 2021 Proved and Probable Reserve Unit % Change Gold on RoM As at 31 December 2020 koz 917 Production depletion 2021 koz -9 % -227 Gold price koz 100 % 0 Production cost koz 279 % -53 Discovery - Exploration koz 37 % 211 Conversion koz -17 % 145 Inclusion / exclusion koz 20 % 10 As at 31 December 2021 koz +11 % 1,013 Notes: a) The Qualified person opinion the year-on-year reserve changes are not material b) Data from Reserve 2020 and Reserve 2021
P a g e 95 | 138 Source: Agnew CPR 2021 A series of overlapping internal processes exist at Gold Fields to review and validate the modifying factors, input assumptions, cut-off grades, designs, schedules, economic evaluation, and other technical assessments. These reviews include site, regional and group technical assessments, internal audits, and trained Competent Person / Qualified person authorizations. Multiple external audits of the Gold Fields reserves declarations and processes for Agnew have been completed within the past 5 years. These processes are designed to reduce the likelihood of a significant or material error in the reserves estimation process and associated reserves declaration, although potential for error exists. The Qualified person for Reserves is not aware of any material error or omission that at the time of writing would be deemed likely to have a significant impact on the operation’s ability to deliver the reserve mine plan.
P a g e 96 | 138 13 Mining methods The mining process and methods comprises two principal activities: (i) developing access to the orebody; and (ii) extracting the orebody once accessed. These two processes apply to both surface and underground mines. 13.1 Open pit In open pit mining, access to the orebody is achieved by stripping the overburden in benches of fixed height to expose the ore below. This is most typically achieved by drilling and blasting an area, loading the broken rock with excavators into dump trucks and hauling the rock and/or soil to dumps. The overburden material is placed on designated waste rock dumps. Extraction of the orebody involves a similar activity as in stripping the overburden. Lines are established on the pit floor demarcating ore from waste material and the rock is then drilled and blasted. Post blasting, the ore is loaded into dump trucks, based on a defined ‘dig plan’ demarcating the position of the ore and waste boundaries post the heave and throw movement caused by the blasting, and hauled to interim stockpiles or directly to the crusher at the process plant, while the waste is hauled to waste rock dumps. There has been no open pit mining at Agnew since 2012, but this will change in H2 2022 with Barren Lands Open pit planned to start. Current pits included in the 31 December 2021 Mineral reserve are 450 South, Maria South, Barren Lands and Hidden Secrets. Detailed mining studies were completed on each of these pits to a pre-feasibility study level, including external assessment of costs and the mining schedule, geotechnical assessments, metallurgical testwork and hydrological assessments for creek diversions. A pre-feasibility study has an estimated operating and capital cost accuracy of ± 25 % with a contingency of no more than 15 %. Open pit mining will be by conventional drill and blast, with truck and shovel operations. Overall, the pits represent 4 % of the total reserve ounces for Agnew. The open pits are seen as a consolidated approximate 12-month duration opportunity to ensure critical mass in mobilizing a contractor to complete all the open pits then de-mobilize. The drill, blast, truck and shovel equipment supplied will be supportive of mining the narrow orebodies with minimum dilution. The open pits will be sequenced together to optimize the waste strip and expedite the ore to the processing facility. Agnew is not expecting to build significant stockpiles for future processing. The Qualified person considered the following factors when selecting the open pit mining method: (a) The geotechnical and rock behaviour models, see Section 7.4 for detail a) The hydrological surveys as described in Section 7.3 b) The open pits are supplementary to the underground and are completed within twelve months of commencing c) The modifying factors including strip ratios as stated in Table 12.2.1 and the open pit cut-off grades as stated in Table 12.3.1 d) The mining fleet configuration and equipment specifications as stated in
P a g e 97 | 138 e) Table 12.2.6 f) Practical mining rates, selective mining unit dimensions, mining dilution and mining recovery 13.2 Underground For Agnew’s underground mines, access is through single or multiple decline haulages extending from surface portals. Horizontal and decline development at various intervals from the main decline, known as levels, extend laterally and provide access to the ore horizons for mining. Once an orebody is accessed for mining (or stoping), production activities consisting of drilling, blasting, cleaning, ground support and transporting rock, which are carried out on a daily basis. Broken ore is loaded straight from the stope face into trucks, using mechanical loaders, and hauled to the surface by underground dump trucks via the declines. Application of backfill or paste fill to the mined-out areas to support the ground is based on local conditions and is not always required in shallow underground mining areas. Both Waroonga and New Holland are established mines with existing infrastructure. The Redeemer Complex is proximal to the historic underground, and includes establishment of a new portal, surface infrastructure, declines, and underground infrastructure. Mining operations at Agnew are carried out by a mixture of owner-operators and contractors, with equipment replacement schedules and leasing requirements considered in the mine plans. The reserves life of mine plan and associated financial models include sufficient infrastructure and sustaining capital investment for all mines to execute the life of mine plan. 13.2.1 Waroonga Waroonga (Figure 13.2.1) is predominantly mined using open stoping with cemented paste fill where required. The underground mining is carried out under contract to Barminco including the supply of all equipment, refer to Table 12.2.6. Figure 13.2.1: N-S Section of Agnew Mine’s Waroonga complex
P a g e 98 | 138 Notes: a) The final underground reserve Source: Agnew CPR 2021 The mining method at Waroonga involves development of a hangingwall access drives parallel to the orebody, from which crosscuts are mined into the mineralized lode. Ore drives are mined north and south, with long-hole open stopes of 15 m to 25 m strike lengths. The level spacing is 20 m to 25 m floor to floor. Stopes, once complete, are backfilled with cemented paste fill where required, produced from screened dry tailings with the addition of sand and cement as a binder. Backfill is used for regional stability, minimize mining spans and to increase ore extraction ratios. The general sequence for most of the mine is top-down, maintaining a 45º advancing front, retreat mining along strike under exposed paste fill from the mined-out levels. In some areas, including the upper parts of the FBH orebody and Waroonga North, a bottom-up mining sequence was introduced to provide additional mining areas. Capital infrastructure including extension of the return air rise, secondary egress, paste fill pipes and dewatering system are incorporated into the Mineral reserve mine plan. The Edmunds orebody sits in the footwall of the Kim South lode and is generally accessed from the Kim South crosscuts after paste filling on the level that has been completed. The Edmunds mining method is similar to the Kim South orebody, with a retreat stoping sequence. Edmunds strike lengths are between 15 m to 20 m, and all stopes are paste filled allowing improved extraction of the ore. The mining method employed for the Main orebody evolved considerably over previous years. Modifications and redesigns to both on-level development and stoping extraction are made as the geological and geotechnical understanding improves. The FBH mining area is located approximately 350 m along strike to the south of the Kim South orebody, and consists of multiple north-south narrow lodes dipping 65º to the west. The mining method for FBH is long-hole open stoping with paste fill. Stoping is top-down or bottom-up. FBH uses parallel developed tunnels with stoping retreating to the central accesses. Stope sizes are adjusted depending on competent or poor ground conditions.
P a g e 99 | 138 Most of the design assumptions used in FBH are consistent with those tested in Kim South. Hangingwall drives have increased ground support to reduce secondary ground support and maintain productivity. Ground conditions have been observed to worsen as mining extends at depth in FBH. Overall, Waroonga is currently limited by geotechnical sequencing, ventilation and paste fill infrastructure constraints. The current Mineral reserve life of mine plan incorporates steady state development and production in line with these constraints.
P a g e 100 | 138 13.2.2 New Holland The mining methods used for the Mineral reserves at New Holland are inclined room and pillar and long-hole open stoping (Figure 13.2.2). All underground mining is completed by an owner-operator team (Table 12.2.6). Figure 13.2.2: N-S section of Agnew Mine’s New Holland complex Notes: a) The final underground reserve Source: Agnew CPR 2021 Long-hole open stoping is the principal ore extraction method, accounting for the majority of ore tonnes. Where necessary, rib and crown pillars are employed to maintain the stability of the stopes. Arch designed stope crowns assist stability. Island pillars optimize extraction and are incorporated into the mine design when the dominant westerly-dipping structures are encountered. Pillar spans and spacing are based on the results of numerical stability modelling. Recent mining knowledge has generally confirmed good to very good ground conditions at Cinderella, Himitsu, New Holland and Sheba. Sheba South ground conditions are expected to change at depth and increased ground support standards and reduced stope spans are planned. Exploration drill drive development is underway to test the Sheba South lode at New Holland. 13.2.3 Redeemer The undeveloped Redeemer Zone 2 and Barren Lands underground is offset to the north of the former Redeemer mine which is backfilled with tailings. Redeemer Zone 2 is 1 m to 10 m wide, with the majority of the targeted ore ranging from 1.5 m to 3.0 m wide at an inclination of 70 º to 90 º. The mine is 200 m to 500 m below surface with an orebody horizontal extent of circa 400 m.
P a g e 101 | 138 Figure 13.2.3: N-S section of Agnew Mine’s Redeemer complex Notes: a) The final underground reserve Source: Agnew CPR 2021 Redeemer Zone 2 and Barren Lands underground will be mined by long-hole open stoping with rib pillars and selective paste fill, top-down and a circa 45 º geotechnical production front. A central access design allows for northern and southern ore drives along the orebody. Stoping retreats to the central access. The Redeemer portal is planned in the eastern wall of the Barren Lands open pit, approximately 60 m below surface, and 15 m above the pit floor. The Barren Lands Open Pit is planned to commence in Q3 and decline development planned to commence in H2 2023. Ground conditions are anticipated to be similar in nature to New Holland and as such production rates have been benchmarked against New Holland productivities. The redeemer complex will be accessed via: A single decline will drive approximately 1.6km south to access the Redeemer Zone 2 North orebody North to target the Barren Lands underground 1.8km to the vent and escapeway connections The decline is a figure-eight positioned centrally to the orebody, exclusively in the hangingwall rock units and at least 50 m off the orebody in the hangingwall. The Qualified person considered the following factors when selecting the underground mining method for the Waroonga, New Holland and Redeemer areas: (a) The geotechnical and rock behaviour models, see Section 7.4 for detail a) The hydrological surveys as described in Section 7.3 b) The modifying factors including underground cut-off grades as stated in
P a g e 102 | 138 c) Table 12.2.4Table 12.2.4 d) The mining fleet configuration and equipment specifications as stated in Table 12.2.6 e) Practical mining rates, stope size dimensions, mining dilution and mining recovery f) Infrastructure and operating capacities and constraints g) Capital and operating costs and economic viability 13.2.4 Geotechnical and hydrogeological parameters Each mine at Agnew has a specific Ground Control Management Plan, which outlines the systems and processes used to address and manage the risks associated with ground control. The underground life of mine plans adapts to incorporate the evolving geoscientific information across a wide range of parameters including hydraulic radii, pillars, stope brows, abutments, sequencing, dilution, access development dimensions, mining induced stress and seismicity management. The open pits have been designed using the information in Table 7.4.1 and Section 12.2.4. Regional Stability The regional stability at Agnew is reviewed using numerical modelling software. This is undertaken when new mining areas are outlined. Extraction strategies, pillar sizes and abutment locations are evaluated during this modelling to ensure mine plans are geotechnically robust. Geotechnical analysis is undertaken at a pre-feasibility study level prior to the inclusion of new mining areas into reserves. Despite minor seismicity occurring, this is not considered a material risk. Infrastructure Long term infrastructure including declines, passes, ventilation shafts, raises and escapeways require individual geotechnical investigations early in the planning process. These types of infrastructure are critical long-term excavations and therefore are investigated by evaluating the effects of ground conditions and mining induced stresses on excavation performance throughout the required life of these excavations. Early geotechnical evaluation allows the infrastructure to be relocated if adverse excavation performance is expected. The geotechnical analysis completed during the early design stage is generally refined based on any new information obtained during the final design stage. Permanent infrastructure is designed to fall outside the zone of influence of stoping (i.e., located sufficiently far into the footwall and/or hangingwall to be unaffected by any regional collapses, relaxation or stress abutments). A Ground Support Standard has been developed and each mining profile has specific requirements (e.g., bolting and meshing) that are calculated by development dimensions, the expected ground conditions, and the excavation life and serviceability. As mining has progressed deeper, stress effects are becoming more evident and therefore ground support requirements will be changed. Stopes Stope designs are a combined effort between the geology, production and geotechnical departments. The geotechnical input in early stage planning generally comprises the calculated stable stope dimensions, the minimum ground support required and other geotechnical considerations in relation to stoping. The geotechnical input into the final stope design generally includes finalizing the stable stope dimensions and required ground support based on any new information. Sequencing The mining sequence can influence ore recovery, extraction ratios, ore dilution and level of rehabilitation required in the development excavations. To manage these effects, mining sequences are evaluated using geotechnical techniques to optimize ore extraction whilst minimizing dilution, without compromising safety. Numerical modelling is used to
P a g e 103 | 138 provide an estimation of the influence of mining induced stresses on development excavations, stopes and geological structures. Numerical modelling results are used to optimize mining sequences. Hydrogeology Both the New Holland and Waroonga underground mines have experienced no significant issues with hydrogeology; however, Waroonga had issues with water ingress in 2017 through old workings and ungrouted surface drill holes following heavy rains. New Holland also experienced production delays in 2017 following intense localised rain events damaging roadways and filling the pit sump. Flood management trigger-action-response plans are in place for both operations. The Qualified person’s opinion is that all appropriate geotechnical and hydrogeological parameters have been suitably considered and risk assessed to support the mining method selection and extraction sequencing and this information is embedded in Agnew’s Ground Control Management Plan which is routinely updated as new empirical information becomes available. The mine plan is geotechnically robust from a local and regional stability perspective.
P a g e 104 | 138 14 Processing and recovery methods 14.1 Flow sheet and design The 1.3 Mt per annum (approximate) Agnew CIP process plant is a conventional crush-grind-leach-CIP circuit as all ore sources are reasonably amenable to gold extraction using cyanide. A schematic process flow sheet for the process plant is shown Figure 14.1.1. Figure 14.1.1: Schematic flow diagram of Agnew process plant Source: Agnew CPR, 2021 The crushing circuit comprises of a primary jaw crusher followed by a secondary and two tertiary crushers in closed circuit with double deck screens. Crushed product is fed from the fine ore stockpile and ground to 80 % passing 125 μm using a two-stage closed circuit primary and secondary ball milling circuit with two overflow type ball mills and 1,200 kW motors. The gravity circuit comprises two 40” QS40 Knelson concentrators with dedicated InLine Leach Reactor for intensive cyanidation of the gravity concentrate. The leach circuit is comprised of three air agitated Pachuca leach tanks each providing an effective volume of 4,100 m³. The adsorption circuit consists of six air agitated Pachuca adsorption tanks with an effective volume of 3,000 m³. Each adsorption tank is fitted with “V” style inter-stage screens and an airlift carbon advance system. Loaded carbon is recovered from the first adsorption tank via a vibrating loaded carbon screen. Loaded carbon from the adsorption circuit reports to the acid wash hopper where it undergoes a hot hydrochloric acid wash. Acid washed carbon is loaded into a pressure Zadra elution column followed by electrowinning at approximately 130°C and 350 kPa. The elution column has a 3.0 t capacity and one elution is conducted each day. Barren carbon from the elution circuit is regenerated in a carbon regeneration kiln.
P a g e 105 | 138 Gold sludge from both the gravity and electrowinning circuits is washed and filtered. The sludge is further refined through smelting and crude doré is poured. Gravity doré bars are approximately 90 % to 95 % gold whereas doré bars from the CIP circuit are dependent on ore feed characteristics and can vary between 65 % and 80 % gold. Doré is dispatched to the Perth Mint refinery for further processing into gold bullion. 14.2 Recent process plant performance The recent performance of the Agnew process plant is provided in Table 12.2.1. 14.3 Process plant requirements Due to age, operability and reliability issues, the circa 1990 ex-contract tertiary crushing plant is being replaced with a new tertiary crushing plant. The construction of this new plant, and associated fine ore storage bin, commenced in 2021 and is scheduled to be commissioned during 2022. The process control systems of the remaining plant sections have been progressively upgraded over recent years to modernise the plant, and to improve its operability and performance. Other minor sustaining capital work planned in 2022 includes: Tailings delivery pipeline upgrade Leach tank repairs Infrastructure remediation The key process plant requirements estimated for the end-2021 Reserve LoM plan are summarised in Table 14.3.1. These consumables quantities have been estimated using guidance from the 2022 Budget LoM, prorated based on plant feed mass. The number of plant employees required is in the range of 50 to 60. Table 14.3.1: Agnew process plant – key requirements summary Unit Year 2022 2023 2024 2025 2026 2027 Ore Processed kt 1,267 1,123 1,173 829 491 256 Plant Power draw GWhr 34 32 33 28 22 19 Grinding Media t 827 733 766 541 321 167 Lime t 44 57 59 42 26 59 Sodium Cyanide t 34 30 31 22 13 7 Caustic t 12 10 11 8 4 2 Activated Carbon t 6 5 5 4 2 1 Hydrochloric Acid t 4 4 4 3 2 1 Peroxide kL 68 60 63 44 26 14 Source: Agnew CPR 2021 Gold Fields is currently considering various plant throughput upgrade options associated with optimizing potential future increases in the mine life at Agnew. However, the end-2021 reserve life of mine, as shown in Table 14.3.1 does not incorporate such potential future plant upgrades. 14.4 Processing Risks 14.4.1 Major Equipment Failure Industrial mineral processing plants consist of a series of dedicated unit processes, e.g., crushing, grinding, leaching, carbon-in-pulp (CIP), and carbon elution. There is inherent risk associated with catastrophic failure of one (or more) of the key equipment items associated with these unit processes, whereby such failure could lead to a significant period
P a g e 106 | 138 of plant downtime until repairs are completed, resulting in the inability of the processing plan or forecast to be achieved and/or higher operational costs incurred than anticipated. Catastrophic failures could be associated with the structural, mechanical, or electrical components of the key processing equipment items. Key equipment items could include the crushers, grinding mills, or leach/CIP tanks. Risk minimisation activities to reduce the likelihood of such occurrences adopted by Agnew includes: Dedicated on-site maintenance department which undertakes condition monitoring activities, preventative maintenance, and repairs Critical spares (e.g., spare mill motors and gearboxes) Contingency operational plans (e.g., contract/mobile crushing plant, leach/CIP tank by-passing) Fire suppression systems Insurances Decisions associated with asset management, critical spares, insurances, etc. are outside the responsibility and accountability of the Qualified person, and that some inherent risk and uncertainty associated with catastrophic failure of processing equipment remains. 14.4.2 Plant Operational Management The processing facilities are managed and operated by dedicated teams of personnel, who are required to make many operational and maintenance decisions every day. These decisions can directly impact the performance of the plant while processing the future ore reserves. For example, a decision to process ores at a higher throughput could result in a coarser grind size from the grinding circuit, resulting in a lowering of the plant recoveries. Similarly, the choice to operate the leaching circuit at lower free cyanide concentrations to reduce cyanide usage rates, could result in lower plant recoveries being achieved than anticipated. It needs to be recognised that plant management and the associated decisions made by plant operating personnel, are outside the responsibility and accountability of the Qualified person, and that such decisions and actions taken by plant management can influence the achieved performance of the plant (e.g., throughput, costs, availability and recoveries). 14.4.3 Operating Costs, Plant Consumables and Reagents The operating cost of the processing plant represents a significant cost element to the overall financial evaluation of the reserve life of mine plan. The processing facilities use relatively large quantities of power, reagents and consumables, including fuels, cyanide, grinding steel media, lime, caustic, etc. The estimation of future processing costs is required as input into the cut-off-grade calculations and economic assessments of the Mineral reserves and Mineral resources. Processing cost estimates require assumptions to be made concerning consumables consumption rates, unit prices and inflation rates. Metallurgical testing undertaken on the future reserves provides reasonable guidance of potential reagent consumption rates and mill throughput expectations, and this information is considered and reviewed by the plant metallurgist and the Qualified person. Agnew, like many other operating gold processing plants that have a reasonable operating history, do not allow for a discreet operating cost contingency in their future operating cost forecast. The absence of contingency is considered by the Qualified person as being a common and reasonable approach to operational process plant cost forecasting. Consumables, commodity pricing and inflation are subject to external influences that are outside the control or predictive capability of the Qualified person.
P a g e 107 | 138 Further to this, operational decisions made by plant management, or unexpected variances in the nature of the ores being processed could unexpectedly impact reagent and consumables usage rates. Such variances are outside the control or predictive expectations of the Qualified person. The Qualified person’s opinion is that all key processing parameters have been suitably reviewed to support the processing and recovery methods incorporated in the Agnew life of mine plan. The processing flow sheet, plant design, equipment and specifications are all within demonstrated operating ranges experienced at the mine over an extended operating history.
P a g e 108 | 138 15 Infrastructure Agnew is serviced by sealed road infrastructure to the mine gate. Supplies are generally trucked in from Perth or Kalgoorlie. Agnew is a fly-in fly-out operation with local services and external accommodation including air transport with a sealed runway. A new mine owned camp was completed in 2019, which accommodates the mine employees and contractors. The bulk of the water is supplied from the mining operations and recovered from the in-pit tailings facility and previously mined pits. Details on each major item of non-process infrastructure is discussed in this section. The site infrastructure layout is shown in Figure 3.1.1. 15.1 Tailings storage facilities (TSF) Process plant tailings do not undergo any thickening before discharge and are pumped directly to the active tailings storage facility 4 (TSF 4) at the former Songvang open pit approximately 15km south of the Agnew process plant. Hydrogen peroxide is injected into the tailings slurry at the tailings pump box to maintain weak acid dissociable (WAD) cyanide concentrations below 50 ppm when required. This is the maximum concentration deemed acceptable for compliance to the International Cyanide Management Code (ICMC), which Agnew is a signatory to. No design or construction drawings have been located for tailings storage facility 1, located within 100 m south-east of the Processing Plant. Tailings storage facility 1 occupies approximately 9.4 Ha with a maximum embankment height of approximately 10 m at the southern end. As can be ascertained, tailings storage facility 1 was initially constructed in 1985 using mine waste and was raised by downstream construction using mine waste. Tailings deposition to tailings storage facility 1 ceased in 1988, although the facility was designated for emergency use between 1988 and 1992. Approximately 0.77 Mt of tailings were deposited into tailings storage facilities 1. Tailings storage facility 3 is an in-pit facility using the former Redeemer open pit approximately 6km south of the Agnew plant. Tailings storage facility 3 is nearing the end of its life and is currently used on an intermittent basis following the commissioning of tailings storage facility 4. Tailings storage facility 2 is an above ground paddock storage facility approximately 1km to the west of the process plant. Tailings storage facility 2 has not been used as an active tailings storage facility since the commissioning of tailings storage facility 3 in 2004 and is now used as a source of backfill for the paste plant operations at Waroonga. Tailings storage facility 4 was commissioned in 2017 with a design capacity of 9.1 Mt of tailings. Based on the evidence provided by the EoR, there are no material deficiencies with the existing facilities. The existing operational tailings storage facility, the Songvang pit (tailings storage facility 4), has an available capacity of ~4.2 Mt up to elevation 404 m AHD. This is insufficient to contain the current Mineral reserve LoM plan requirement of ~5.1 Mt of tailings. Therefore, the EoR has been engaged to commission tailings storage studies in Q1 2022 to increase the available storage capacity by increasing the maximum fill level to ~ 420 m AHD. The tailings delivery pipeline from the plant to tailings storage facility 4 is due for replacement in 2022. The Engineer of Record (EoR) for the Agnew tailings storage facilities is CMW Geosciences based in Perth. All tailings storage facilities need to conform with the Global Industry Standard on Tailings Management (GISTM) by August 2025. A gap analysis has been completed, and the GISTM compliance programme is underway in collaboration with the EoR.
P a g e 109 | 138 Figure 15.1.1: tailings storage facilities locations Source: Agnew CPR 2021 15.2 Waste rock dumps In open pit mining, access to the orebody is achieved by stripping the overburden in benches of fixed height to expose the ore below. This is most typically achieved by drilling and blasting an area, loading the broken rock with excavators into dump trucks and hauling the rock and/or soil to dumps. The overburden material is placed on designated waste rock dumps. Process plant tailings waste and waste rock are two of the most significant by-products produced by mines. By responsibly managing these waste streams, we can minimize their impact on the environment and our host communities. 15.3 Water All water used at Agnew is sourced from groundwater. The primary and largest use of groundwater is for ore processing, followed by dust suppression, paste plant operations and potable water. Mine dewatering is reused within the underground mine for dust suppression, the paste plant and to supplement process water. Return water return from the tailings storage facilities is the largest source of water for the process plant. A water supply of up to 4,900 kl/day is required for processing. Additional water is supplied from the Fairyland borefield (located approximately 22km from the process plant) and the Daisy Queen borefield (located approximately 12km from the process plant), EMU borefield (approximately 2km from process plant) and the former Hidden Secret open pit at New Holland. The current operation is utilizing 50 percent of the licenced allocation (3,377,980 kl/annum of 6,810,000 kl/annum) across three GWLs. 2 Gl/annum is required for mine make-up water requirements.
P a g e 110 | 138 15.4 Power The hybrid power station on the Agnew mine site commissioned in 2020 comprises 18 MW of gas generators, 3 MW of backup diesel generators, 4 MW of solar, 18 MW of wind generation and a 13 MW/4 MWh battery. More than 54 % of Agnew’s power is generated from renewable sources. Currently, expansion studies are underway to accommodate growth at New Holland, the Redeemer complex and the Greater Agnew Project with solar as the primary source of energy. 15.5 Accommodation Site accommodation is provided by an 815-person mining camp built in 2019 located directly south of the former Agnew townsite. The accommodation village is managed by Civeo. 15.6 Site access Mine site access is dual lane elevated truck compacted roadways constructed from mining waste material connect the surface infrastructure. These roads connect the existing operating mines, infrastructure and old workings (Figure 3.1.1). There is minimal access requirement to service the satellite pits. 15.7 Other infrastructure Agnew has one paste plant located to the north of the Waroonga pit. The paste is distributed through three paste fill reticulation bore holes. These holes are sufficient for the underground life of mine reserve. The Redeemer and Barren Lands underground life of mine reserve does not require paste fill. Agnew has ancillary infrastructure to support mining. These include an airfield, workshops, mine offices, training centres, communications, medical and emergency response, maintenance, laboratory, core yard/sample storage, contractors’ yard, explosives compound, fuel and reagent storage, and sewage and renewable hybrid energy generation facilities. The Qualified person believes that the infrastructure for the Agnew mining operation is fit for the life of mine reserve estimation and that the Mineral reserve quantities are tested against dump and disposal capacities. The Engineer of Record has been engaged to commission tailings storage studies in Q1 2022 to increase the available storage capacity of the Songvang pit by increasing the maximum fill level.
P a g e 111 | 138 16 Market studies 16.1 Preliminary market study A review of metal prices for planning purposes is undertaken annually to monitor any significant changes in price trends or exchange rates that would warrant re-calibrating the price deck before the Strategic Planning process transitions into the Business Planning cycle. This review of the metal price deck has taken account of the prevailing economic, commodity price and exchange rate (Fx) trends, together with market consensus forecasts, in addition to consideration of the Gold Fields’ strategy and expectations for the operations. Our strategy is to (1) mitigate annual volatility by holding planning metal prices as long as warranted to support stability in mine planning, notably regarding the underground MSO and open pit shell selections; (2) maintain appropriate margins on spot and long-term price forecasts to support the Group’s BSC metrics; (3) protect against accelerating mining sector inflation and, (4) to confirm a separate gold price to be used specifically for the Operational Pan (budget) revenue streams and cash flows in Q3 each year. The outcome of the pricing analysis was to use a gold price of $1,300/oz for Mineral reserves and $1,500/oz for gold Mineral resources for the December 2021 disclosure of estimates. The relevant copper and silver prices in US Dollars are shown in the summary table below. Note the A$/oz and ZAR/kg gold prices applied to the estimates in Australia and South Africa are included for transparency. Table 16.1.1: Reserve and Resource metal prices Units December 2021 Metal price Deck Metal Unit Mineral reserve 31 Dec 2021 Mineral resource 31 Dec 2021 Gold US$/oz 1,300 1,500 A$/oz 1,750 2,000 ZAR/kg 650,000 750,000 Copper US$/lb. 2.8 3.2 Silver US$/oz 17.5 20.0 Source: Agnew CPR 2021 The above price deck comparison to market long-term forecasts assessed at the time of analysis is consistent with the Registrants approach to retaining good discipline in support of the Company strategy; this approach ensures Gold Fields’ Mineral resources and reserves are not too volatile year-on-year and that the company is protected against possible downside scenarios if the gold price falls up to ~25 % in any specific year. Ensuring sufficient flying height to maintain our margins at prices that could be incrementally lower than the spot price ranges seen in 2021 is also important. Equally, with annual mining sector inflation estimated at $30-40/oz, we need to ensure we mitigate this escalation risk in the life of mine plans and Mineral reserve estimates. Sensitivity analysis on gold price for project financial evaluation is done to provide flexibility/range analysis for all regional studies and site growth opportunities and investment purposes. The Mineral resource gold price premium to the Mineral reserve price is circa 15 % and the differential is in general alignment to our peer group and industry standard practice. The Mineral resource price premium is to provide information on each operation’s potential at higher gold prices and to indicate possible future site infrastructure and mining footprint requirements. All gold produced at Agnew is refined by the Perth Mint in Western Australia. The Perth Mint applies competitive charges for the collection, transport and refining services. The Perth Mint takes responsibility for the unrefined gold at collection from the operation where it engages a sub-contractor, Brinks Australia. Brinks delivers the unrefined gold to the Perth Mint where it is refined, and the refined ounces of gold and silver are credited to the relevant metal accounts
P a g e 112 | 138 held by the operating company with the Perth Mint. The contractual arrangement with the Perth Mint continues until terminated by either party upon 90 days’ written notice. Gold Fields’ treasury department in the corporate office in Johannesburg, South Africa sells all the refined gold produced by the operating company. On collection of the unrefined gold from a mine site, the relevant operating company will notify Gold Fields’ treasury department of the estimated refined gold content, expressed in troy ounces, available for sale. After such confirmation, the treasury department sells the refined gold to authorised counterparties at a price benchmarked against the London Bullion Market Association PM gold auction price. All silver is sold to the Perth Mint at the London Bullion Market Association silver price on the last business day of each month. Gold Fields may periodically use commodity or derivative instruments to protect against low gold prices with respect to its production. Variations in gold price, currency fluctuations and world economics can potentially impact on the revenue received. No gold derivative instruments are in place at the date of this report. The majority of gold production is used for jewellery and for investment purposes, in the latter case because the market views it as a store of value against inflation. In addition, certain physical properties of gold, including its malleability, ductility, electric conductivity, resistance to corrosion and reflectivity, make it the metal of choice in a number of industrial and electronic applications. Supply of gold consists of new production from mining, the recycling of gold scrap and releases from existing stocks of bullion. Mine production represents the most important source of supply, typically comprising 75 per cent. each year. Annual demand requires more gold than is newly mined and the shortfall is made up from recycling. Management believes that long-term gold supply dynamics and global economy trends will support the gold price at levels above or aligned to $1,300 per ounce in the long-term. The market for gold is relatively liquid compared to other commodity markets, with London being the world’s largest gold trading market. Gold is also actively traded via futures and forward contracts. The price of gold has historically been significantly affected by macroeconomic factors, such as inflation, exchange rates, reserves policy and by global political and economic events, rather than simple supply/demand dynamics. Gold is often purchased as a store of value in periods of price inflation and weakening currency. The price of gold has historically been less volatile than that of most other commodities. Significant service contracts and/or leases that are in place to enable execution of the life of mine plan include: Perth Mint - Refining Barminco – Mining & Drilling MLG – Ore Haulage Coastal Midwest Transport - Freight haulage RUC Cementation – Raise boring APA Operations – Gas Transportation EDL – Power supply Alliance Airlines – Flights Action Industrial Catering – Camp Services ALS Global – Assay Services The Qualified person has relied on information provided by the Company in preparing its findings and conclusions regarding market studies related to gold sales from Agnew. Refining services are based on well-established long-term agreements and expediting gold sales over the life of the asset does not represent any significant uncertainty. Service contracts, lease agreements and goods contracts e.g., diesel, cyanide and cement, necessary to develop the property as planned, are in place and have the capability to support the full projected cash flow period.
P a g e 113 | 138 16.2 Metal Price history Gold prices London Metals Exchange afternoon close Gold spot 30 December 2021 - $1,805.85/oz - A$2,484.32/oz Fx 30 December 2021 A$1:$0727c Gold spot 24 month average - $1,784.5/oz Gold spot 36 month average - $1,653.71/oz Gold spot 60 month average - $1,497.48/oz
P a g e 114 | 138 17 Environmental studies, permitting, and plans, negotiations, or agreements with local individuals or groups Climate change is an integral part of the Mineral reserve generation process and incorporating relevant costs associated with climate change, primarily decarbonisation, mitigation and adaptation to the changing climate, is a key theme for the Company. Integration of these key elements into the Mineral reserve process is being carried out progressively and simultaneously across all of Gold Fields’ sites. 17.1 Permitting The key operating environmental permits for the operation are issued by DMIRS and DWER and relate to: Mining proposal which includes land clearing, disturbance and infrastructure Environmental licence Native vegetation clearing Mine dewatering (category 06) Water abstraction and groundwater operating strategies Sewerage facility (category 54) Putrescible landfill site; and Mine Closure Plan The operation has these permits in place and manage the obligations through the legal register. No penalties, sanctions or directives that are currently in place (2021 to current) related to the permitting framework at Agnew. A Mining Proposal has been approved by the Western Australian Department of Mines, Industry Regulation and Safety (DMIRS) for the most recent Barren Lands Open Pit Project. Amendments to the site Environmental Licence which is governed by the Western Australian Department of Water and Environmental Regulation (DWER) may be required for dewatering of the open pit during operations or dewatering of the planned Redeemer underground operations. Heritage surveys are conducted to support both mine development and exploration targets. At this stage no Section 18 approvals are required under the Aboriginal Heritage Act to support future operations and drilling. A Project Management Plan is currently being developed for submission to the Department of Mines, Industry Regulation and Safety for the Barren Lands Open Pit Project, which is a requirement before mining can commence. The Agnew Department of Water and Environmental Regulation DWER Environmental Licence is pending amendments for the new crushing facility, water discharge into the Cox pit and dewatering of the Barren Lands open pit. A summary of all current Agnew Gold Mining permits is provided in Table 17.1.1. Table 17.1.1: Select list of Agnew permits Number Purpose Registered holder Status Grant date Expiry date Fines L4611/1987/11 Operating Licence - Agnew AGMC Granted 18/10/2013 23/10/2022 Nil GWL63840(7) Fairyland pit dewatering AGMC Granted 26/05/2015 04/12/2023 Nil GWL151398(5) Fairyland borefield AGMC Granted 05/12/2013 04/12/2023 Nil GWL64335(10) Agnew mining areas AGMC Granted 04/01/2016 28/12/2025 Nil GWL55840(9) Lawlers and Daisy Queen AGMC Granted 20/05/2014 04/12/2023 Nil
P a g e 115 | 138 134.09 Approval to install sewage treatment apparatus AGMC Granted N/A N/A Nil CAW201054(1) Construct or alter well AGMC Granted 19/03/2018 19/03/2020 Nil CAW183582(1) Construct or alter well AGMC Expired 13/12/2016 13/12/2022 Nil 5110/1988/10 Operating Licence - Lawlers AGMC Granted 16/10/2013 19/10/2031 12:00:00 AM Nil 8248/1 Clearing Permit AGMC Granted 01/03/2019 01/03/2024 Nil Notes: a) The Qualified person has selected a few permits to demonstrate permitting b) The Qualified person is of the opinion that the licences are in good standing and that any current or future licencing can and will be obtained for the Mineral reserve or the Mineral resource. c) The Qualified person is of the opinion that Agnew has a good standing with licencing authorities, community groups and that licencing is not expected to be material to reserves or resources d) Agnew is conducting continues rehabilitation and has a large closure liability. The Qualified person is of the opinion that the closure estimates and duration are reasonable and practical Source: Agnew CPR 2021 There is no legal obligation in Western Australia to have unconditional performance bonds in place for mine closure liabilities. Such liabilities for continuing operations are now self-funding. In addition, companies are required to pay a levy to the state based on the total mine closure liability. This levy is 1 % of the total liability per mine, paid annually. This levy goes into a state administered fund known as the Mine Rehabilitation Fund. Capital and interest from the fund will be used to rehabilitate legacy sites or sites that have prematurely closed or been abandoned. 17.2 Environmental studies The regulatory framework and context for the operation ensure that relevant specialist studies are undertaken as part of the permitting requirements and processes. Agnew is entitled to mine all declared material falling within its respective Mining Leases with all necessary statutory mining authorisations and permits in place. The current Environmental Impact Assessments (EIA) and Environmental Management Programme Reports (EMPR) include: Fauna and flora surveys and reports. Heritage surveys and reports. Closure planning review and updates. Contamination/ecotox/hazard investigations. Hydrogeological/groundwater modelling. Landform design and engineering for waste landforms. Waste characterisation reports. Development of landform decommissioning plans. Annual dam safety inspections of active tailings storage facilities. Surface water hydrology and drainage assessment studies. Maintenance of material inventory balance studies. Contaminated sites management and development of Preliminary Site Investigations. There is no Annual EIA for Agnew Gold Mine, there are however a series of annual reports which are submitted each year to various Government Departments which cover monitoring and measurement against potential environmental impacts. These are shown in Table 17.2.1.
P a g e 116 | 138 Table 17.2.1: Government Departments which cover monitoring and measurement against potential environmental impacts Report Name Type Frequency DWER L4611/1987 Operating Licence – Agnew – Annual Environmental Report & Annual Audit Compliance Report Regulatory Annual DWER L5110 Operating Licence – Lawlers – Annual Environmental Report & Annual Audit Compliance Report Regulatory Annual DMIRS Agnew Annual Environmental Report Regulatory Annual DMIRS Lawlers Annual Environmental Report Regulatory Annual DMIRS Cams Annual Environmental Report Regulatory Annual Agnew Tailings Dam Audit – DMIRS Regulatory Annual Agnew Mine Closure Plan Regulatory Annual Clearing Permit Report – DMIRS Regulatory Annual Groundwater Monitoring Summary/Review – Fairyland Pit, Fairyland Borefield, Lawlers & Daisy Queen, Agnew Mining Areas Regulatory Annual Mining Rehabilitation Fund Regulatory Annual National Pollutant Inventory Regulatory Annual National Greenhouse Emissions Reporting Scheme Regulatory Annual Tjiwarl Native Title Agreement Report Regulatory Annual SPR/GRI reporting Internal Monthly Source: Agnew CPR 2021 Key outcomes of the environmental studies include: 17.3 Waste disposal, monitoring and water management 17.3.1 Tailings storage facilities (TSF) The operation of the Agnew tailings storage facilities is audited quarterly by a third-party consultant, CMW GeoSciences, who is also the appointed Engineer of Record (EoR). The independent technical reviewer is Coffey (Tetra Tech). Based on observations made by the EoR, the facilities are deemed to be in good order. Tailings storage facilities 1 to 3 have been assigned an ANCOLD consequence classification of Very Low, while tailings storage facility 4 has been assigned a consequence classification of Low. The total freeboard on in-pit tailings storage facility 3 was between 1 m and 2 m at the last EoR site visit and was assessed as adequate. Tailings storage facility 4 has adequate freeboard estimated at ~70.5 m. Tailings storage facility 2 is currently being reclaimed for use as underground paste backfill. In addition, the Redeemer in-pit tailings storage facility (tailings storage facility 3) is used occasionally for tailings deposition to optimize the final rehabilitation landform. Bathymetry surveys are carried out quarterly. These surveys are used to estimate the tailings insitu density, water volume and evaluate the tailings profile underwater. Embankment movement monitoring is not carried out on tailings storage facility 3 or tailings storage facilities 4 at Agnew, as both are in-pit facilities. Phreatic surface levels at Agnew tailings storage facility 2 have not been measured since 2018 as tailings storage facility 2 is being reclaimed using an excavator and trucks. tailings storage facility 3 and tailings storage facility 4 are both in-pit facilities. The Agnew tailings storage facilities were surveyed during Q3 2021. tailings storage facility 2 and tailings storage facility 3 had no water present, and tailings storage facility 4 had ~17.0 % pit perimeter area coverage with water and a water volume of ~20,104 m³.
P a g e 117 | 138 The pH, TDS, and WAD CN observations at tailings storage facility 2, tailings storage facility 3 and tailings storage facility 4 complied with the DWER licence requirements. The water levels are monitored in 6 bores around Songvang (tailings storage facility 4), 9 bores around the Redeemer Pit (tailings storage facility 3), and 8 bores around tailings storage facility 2 every quarter in accordance with the DWER licence. The standing water levels in all Songvang tailings storage facility 4 groundwater bores have been consistent throughout Q3 2020 – Q3 2021, with no significant variations observed. Groundwater monitoring results did not highlight any concerns with any of the active tailings storage facilities at Agnew. The tailings storage facilities at Agnew are being well managed from a dam safety and governance perspective. (a) The Qualified person believes that the procedures and monitoring, water management practices are adequate for the life of mine reserve estimate. A PFS study is ongoing to support the current reserve TSF capacity shortfall of ~1 Mt and will be completed towards the end of Q1 2022. 17.3.2 Waste rock dumps Design and construction parameters for waste rock landforms are determined through “best practice” materials characterisation and erosion testing and modelling. For new landforms, this process is undertaken as part of the Mining Proposal preparation process and for the existing and “legacy” landforms, these are undertaken as required, for remedial and closure planning. Unless indicated otherwise, each landform/project area has a specific set of design and construction parameters developed, representing a closure concept. The closure plan is updated with these details as required. (a) The Qualified person is of the opinion that the waste rock dumps at Agnew are adequate for this life of mine reserve plan. Regular waste rock inspections are performed to assess safety. 17.3.3 Water management Agnew holds four groundwater abstraction (water drawn from bores) licence (GWL64335, GWL63840, GWL151398 and GWL55840) administered by the Department of Water and Environmental Regulation (Table 17.1.1). This allocation allows annual combined abstraction of 7,175 ML and adequately covers Agnew’s maximum possible water abstraction requirements. Groundwater monitoring is managed by the site environmental department and is conducted regularly as part of the Department of Water and Environmental Regulation licence and Mining Lease conditions, and Mining Proposal commitments. These monitoring programmes include groundwater levels and water quality at the borefields, dewatering pits and surrounding the tailings storage facilities. Water management is not considered to present a major risk to Agnew. The acquisition of the Lawlers tenements from Barrick Gold in 2013 has greatly increased Agnew’s water options and regular reviews are carried out to ensure the current resources are sustainably utilised. Most of the water at Agnew is reused within the mining areas and processing circuits. Storage is largely in settling and storage ponds as well as disused open pits. The key operational areas are also supported with tanks that contain enough surge volume to ensure minimal interruption to business in the event of a pump failure at one of the ponds. (a) The Qualified person is of the opinion that the water balance and procedures are adequate and support the life of mine reserve estimate The current operation is utilising approximately 50 percent of the licenced allocation (3,377,980 kL/annum of 6,810,000 kL/annum) across three GWLs. About 2 GL/annum is required for mine make-up water requirements. Water for processing primarily comes from tailings storage facility return water (recycled water) and borefield extraction water (groundwater). Water for mining comes predominantly from recycled U/G dewatering (recycled mine water) and the water for Camp and consumption only comes from borefields (groundwater).
P a g e 118 | 138 Discharge to the environment is licenced under Department of Water and Environmental Regulation licences L4611/1987/11 and L5110/1988/10 (Table 17.1.1). These licences cover the following regulated processes: Processing or beneficiation of metallic or non-metallic ore: Mine dewatering. Putrescible landfill sites. Dewatering of the Waroonga underground operations is directed to the Waroonga settling ponds. The settled water is either returned underground and used for dust suppression or directed to the paste plant or process plant via the tailings storage facility 2 return water ponds. Surplus water is discharged to the Hidden Secret open pit. Dewatering of the New Holland underground operations is directed to the New Holland settling ponds. The settled water is either returned underground or is discharged to the Hidden Secret open pit. Water is also drawn from the former Daisy Queen pit at Lawlers and directed to Redeemer for use at the process plant. Apart from tailings being discharged into tailings storage facility 4, tailings from the process plant is pumped to tailings storage facility 3 (Redeemer in-pit) intermittently to achieve and develop the closure landform. Return water is directed to the process plant via the tailings storage facility 3 and tailings storage facility 2 return water ponds. Water is also abstracted from the New Woman, EMU and Fairyland borefields for use in the process plant, underground cooling system and general amenities. Agnew borefield refers to a combination of the New Woman and EMU borefield with New Woman used as a standby field. The water management strategy is being continually improved to better utilise and conserve the groundwater resources at Agnew. The principal water conservation strategy is to maximise water recovery from the tailings storage facilities back to the process plant. The Fairyland borefield has potential for increased abstraction and provides the operation with flexibility if greater amounts of groundwater are required in the future. 17.4 Social and community Agnew’s tenements cover an area over which one Native Title rights exist. The Tjiwarl and Tjiwarl#2 claims (WAD228 of 2011 and WAD 302 of 2015), which cover part of the area comprising the Agnew operations, were determined in 2017 by the Federal Court under the Native Title Act 1993 (Cth). In 2018, the Darlot People registered a claim under the Native Title Act over an area including a small part of Agnew. This claim is still proceedings through the Federal Court process. In 2019, the Federal Court dismissed a native title claim by the Wutha People, which had been registered in 1998, which also covered and are including a significant portion of the Agnew operations. Agnew consults with all relevant stakeholder groups to ensure that Aboriginal cultural heritage sites are identified and recorded. The sites identified during these surveys may be both archaeological (e.g., artefacts) or ethnographic (e.g., an area linked to a story line). Such sites are recorded and managed in accordance with the Western Australian Aboriginal Heritage Act (1972) under site procedures and standards. The Agnew / Lawlers area has a history of European mining activities dating back to 1895 with the Lawlers town gazetted in 1896 and Agnew in 1936. Historical remains including a magazine, jail, cemetery, stamp batteries and headframe are managed by both Agnew and the local government. There are currently no agreements in place with pastoralists, landowners or any other local groups or stakeholder. Ongoing support for host communities across the region includes health improvement and school retention programmes, support of regional community events, host community and Indigenous procurement and employment opportunities, and the promotion of STEM (science, technology, engineering and mathematics) at schools. Agnew has an internal scorecard to ensure host community procurement and hiring.
P a g e 119 | 138 Gold Fields has partnered with Football West as a major sponsor. The commitment and support to Football West is based on its impressive record of growth of the sport in Western Australia, its commitment and focus on a regional level, cultural diversity, inclusiveness and gender diversity. Gold Fields is also a founding member of the Gold Industry Group that represents the interests of gold producers, explorers and service providers to collectively champion, educate and promote the importance of the gold sector in Australia. 17.5 Mine closure Agnew has an up-to-date mine closure plan, approved by Department of Mines, Industry Regulation and Safety (DMIRS) in 2021. The plan has been developed in accordance with legal requirements and Gold Fields guidance, which aligns with the International Council of Mining and Minerals (ICMM) guidance The Mine Closure Plan determines the mine closure requirements and calculates the financial or closure cost liability associated with closure. The Mine Closure Plan identifies the baseline description, the closure vision or objectives, risks and opportunities, and closure activities, which include stakeholder engagement, decontamination, dismantling, re-profiling and revegetation of land or landforms, maintenance and monitoring, including post closure water monitoring (after rehabilitation is completed). The operation has a Progressive Rehabilitation Plan (PRP), developed in accordance with the approved Mine Closure Plan and Group guidance. The operation sets annual targets for the implementation of the PRP and tracks their performance against these targets. These include the recent Lawlers tailings storage facility rehabilitation, Fairyland mine precinct rehabilitation and the remedial rehabilitation of the New Holland waste rock landform. Monitoring of closure objectives is undertaken utilising an in-house Closure Monitoring Protocol. Monitoring data and results are reported annually as part of Agnew’s Annual Environmental Report. Existing cash resources are utilised to fund the progressive rehabilitation activities. Agnew, as a tenement holder, is required to report disturbance data, and to contribute annually to the Mining Rehabilitation Fund (MRF) in accordance with the requirements of the Mining Act. Agnew have developed their closure cost estimate using the Standardised Reclamation Cost Estimator (SRCE) model. Closure costs are reviewed every year to reflect actual and proposed disturbances and changes in closure requirements. The estimated closure cost for Life of Mine is calculated, as of 31 December 2021, as US$ 47m [Au$ 65m * 0.7275 for conversion] (excluding taxes). Financial provision for rehabilitation, closure and post closure obligations are met through existing cash reserves. The SRCE closure cost estimate, developed for asset retirement obligation purposes, is updated and reviewed, externally, every two years by an independent consultant, and reviewed annually as part of the Group financial assurance.
P a g e 120 | 138 18 Capital and operating costs 18.1 Capital costs Capital costs for Agnew are based on items incorporated in the life of mine plan to secure the Mineral reserve stated as at 31 December 2021. Major budgeted capital expenditure items for 2021 include underground works, access developments for extensions, additional drilling including the Sheba South 811 drill drive, Sheba vent upgrade, Kath vent upgrade, Kath access and decline, and mining studies. Exploration expenditure is also required for the growth and resource/reserve conversion pipeline. The forecast capital expenditure costs are summarized in Table 18.1.1. Table 18.1.1: Capital costs ($ million) Capital cost item Units 2022 2023 2024 2025 2026 2027 Mining MP&Dev $ million 49.4 23.3 30.1 16.6 7.7 0 Mining Capital Works $ million 11.6 38.9 24.5 11.7 3.7 0.3 Processing (including TSFs) $ million 18.6 3.1 3.3 1.3 0.7 0.4 G&A Capital $ million 7.0 2.8 3.5 1.8 0 0 Exploration $ million 1.0 1.0 1.0 1.0 1.0 1.0 Capital costs $ million 87.5 69.2 62.3 32.3 13.2 1.7 Notes: a) The capital costs are based on the 31 December 2021 life of mine schedule for proven and probable reserves. b) No inferred Mineral resource is included in the life of mine processing schedule or techno-economic evaluation. c) Exploration costs are limited to year one in the life of mine cash flow model. Gold Fields is expecting to spend between $80 million and $100 million per annum on reserve generation exploration to replace depletion with approximately a quarter share going to Agnew. d) Closure cost is 'Day of Assessment' as at 31 December 2021 with subsequent life of mine disturbance rehabilitation added. e) Tailing storage facilities are costed according to the life of mine requirements. The current in-pit tailings storage facility is expected to have reached capacity before the reserve life of mine is consumed. The cost of the replacement facility is included in the life of mine financial model. Source: Agnew CPR, 2021 18.2 Operating costs Budgeted operating costs for the 31 December 2021 Mineral reserve LoM plan are summarized in Table 18.2.1. Table 18.2.1: Operating costs ($ million) Operating cost item Units 2022 2023 2024 2025 2026 2027 Mining $ million 115.7 103.6 85.8 45.9 31.1 16.4 Processing $ million 28.5 25.9 26.3 21.9 15.8 8.8 General and administrative (G&A) $ million 33.5 29.9 30.4 21.5 19.1 8.6 Other operating costs $ million 5.2 4.3 4.1 2.3 1.2 0.6 Operating costs $ million 183.0 163.7 146.7 91.5 67.2 34.3 Notes: a) The operating costs are based on the 31 December 2021 life of mine schedule for proven and probable reserves. The Mineral resource and exploration required to replace depleted reserves is no included in this techno-economic assessment b) No inferred Mineral resource is included in the life of mine processing schedule or techno-economic evaluation c) Costs are first principles based on the Mineral reserve life of mine schedule d) This operating cost summary estimate is for the Mineral reserve life of mine schedule e) The operating costs also include rehabilitation and closure costs of $54.7 million, inclusive of the additional provision for new open pits, and power station and equipment leasing costs of $2.9 million must be US$ Source: Agnew CPR, 2021 Budgeted closure costs for post the 31 December 2021 Mineral reserve LoM plan are summarized in Table 18.2.2.
P a g e 121 | 138 Table 18.2.2: Post LoM costs Sources Units 2028 2029 2030 2031 2032 2033 Onwards Post Reserve LoM Closure $ million 8.7 6.4 4.2 2.2 0.3 1.6 Property Holding Costs* $ million 2.9 Notes: * Costs included in closure costs Source: Agnew CPR, 2021 The Qualified person’s opinion on capital and operating costs is summarized below: (a) The financial schedule is wired to the life of mine plan to ensure the provision of capital is linked to when the major budgeted items require to be funded a) The capital, operating and closure cost estimation levels of accuracy meet the minimum pre-feasibility study requirements at an estimated accuracy of ±25 % and require no more than 15 % contingency. The specific engineering estimation methods have an accuracy equal to or better than this range. b) Agnew has improved capital estimation and capital delivery through the application of Group Capital Standards and capital projects review by a select team with improved implementation planning. Gold Fields also perform post investment reviews across all major capital studies and share key learnings. c) Gold Fields’ two-year business planning cycle captures operating and capital costs along with key physicals and revenue. The business plans are internally reviewed, presented to the Executive Committee for approval, prior to sanctioning by the Gold Fields board of directors. The business plans are aligned with the Registrant’s strategic direction and equate to the first two years of the life of mine plan. d) Capital expenditure, once sanctioned, must follow the company capital reporting standard. Monthly and quarterly reviews are held to assess capital programmes, operating unit costs, mine physicals, plan execution and revenue streams. e) Operating unit costs are based on recent valid historical performance and where necessary take account of future changing circumstances that are anticipated to impact future operating costs
P a g e 122 | 138 19 Economic analysis 19.1 Key inputs and assumptions Under the 31 December 2021 Mineral reserve LoM plan, the Agnew processing facility is not at full capacity for the full life of the operation. A portion of incrementally costed material is included, which supplements the fully costed feed but does not extend the life of the operation. The mining of the incremental material covers the full unit cost of mining, the variable unit costs of processing, rehabilitation and closure, and positively contributes to fixed overheads and off-site costs. Detailed assessments were undertaken, with iterative reviews prior to inclusion of this material in the 6-year LoM plan. The Mineral reserve life of mine physical inputs are summarised in Table 19.1.1. Table 19.1.1: LoM physical, operating cost and capital cost inputs and revenue assumptions 100 % basis Sources Units 2022 2023 2024 2025 2026 2027 Underground LoM Processed koz 256.3 227.0 217.1 109.3 113.0 47.4 Recovery % 95.0 % 91.8 % 93.4 % 94.4 % 93.7 % 96.0 % Sold koz 243.6 208.4 202.8 103.2 105.8 45.5 Open Pit LoM Processed koz 5.0 5.5 16.0 16.7 Recovery % 96.0 % 94.2 % 90.4 % 96.0 % Sold koz 4.8 5.2 14.5 16.1 Stockpiles LoM Processed koz 3.48 Recovery % 96.0 % Sold koz 3.34 Total Sold pa koz 251.8 213.6 217.3 119.3 105.8 45.5 Costs, Revenue and Cash flow Revenue $ million 327.7 277.7 282.5 155.1 137.6 59.1 Operating Costs $ million 183.0 163.7 146.7 91.5 67.2 34.3 Capital Costs $ million 87.5 69.2 62.3 32.3 13.2 1.7 Other $ million 30.3 27.9 24.7 31.8 26.3 61.9 Royalties $ million 9.0 8.4 8.5 7.0 5.1 2.1 Government levies $ million Interest (if applicable) $ million Costs $ million 309.8 269.1 242.1 162.6 111.8 100.0 Taxes $ million 0.0 4.1 16.4 0.0 0.0 0.0 Cash flow $ million 17.9 4.5 24.0 -7.6 25.8 -40.9 Discounted cash flow at 3.8 % (NPV) $ million 17.9 4.3 22.3 -6.8 22.2 -33.9 Notes: a) The capital costs are based on the 31 December 2021 life of mine schedule for proved and probable Reserve only. The Mineral resource and exploration required to replace dealation is no included in this techno-economic assessment b) No Inferred Mineral resource is included in the life of mine processing schedule or techno-economic evaluation Source: Agnew CPR, 2021 The economic assumptions on which the analysis is based include: The reserve gold price of $1,300/oz for the entire reserve life of mine. A state royalty rate of 2.5 %. A corporate tax rate of 30 %. Assessed losses and capital expenditure being offset against corporate taxes as Gold Fields’ Australian operations are considered as a unit for taxation purposes. A real, base case discount rate of 3.8 % as determined by Gold Fields Corporate Finance on an annual basis. The discounted cash flow (DCF) being applied to annual post-tax, pre-finance cash flows reported in financial years ending December.
P a g e 123 | 138 The life of mine operating and capital cost inputs, including rehabilitation, leasing and closure costs, and revenue assumptions for the economic analysis are summarized in Table 19.1.2. Table 19.1.2 has the breakdown of ESG expenditure included in Table 18.1.1, Table 18.2.1 and Table 19.1.1 Table 19.1.2: LoM cost and revenue assumptions – Breakdown of ESG Sources Units 2022 2023 2024 2025 2026 2027 Progressive Closure $ million 10.0 6.9 6.8 8.5 8.0 2.9 Source: Agnew Techno-economic analysis, 2021 Table 19.1 No decarbonization costs are included because a renewable power source has already been established 19.2 Economic analysis The NPV for Agnew based on the DCF forecast using the scheduled Mineral reserves for the life of the project is $23.7 million. 19.3 Sensitivity analysis Sensitivity analyses were performed to ascertain the impact on NPV to changes in capital, operating costs, discount rate and gold price as summarized in Table 19.3.1 to Table 19.3.4. Table 19.3.1: NPV sensitivity to changes in gold price Gold price – real -15 % -10 % -5 % 0 % +5 % +10 % +15 % +25 % +31 % Gold Price 1,105 1,170 1,235 1,300 1,365 1,430 1,495 1,625 1,700 NPV ($ million) -126.6 -70.1 -20.6 23.7 65.6 105.9 146.2 226.7 273.2 Source: Agnew CPR, 2021 Table 19.3.2: NPV sensitivity to changes in grade Grade -15 % -10 % -5 % 0 % +5 % +10 % +15 % NPV ($ million) -124.9 -69.0 -20.2 23.7 65.3 105.2 145.1 Source: Agnew CPR, 2021 Table 19.3.3: NPV sensitivity to changes in capital costs Capital costs -15 % -10 % -5 % 0 % +5 % +10 % +15 % NPV ($ million) 53.1 43.8 33.8 23.7 13.1 2.6 -7.9 Source: Agnew CPR, 2021 Table 19.3.4: NPV sensitivity to changes in operating costs Operating costs -15 % -10 % -5 % 0 % +5 % +10 % +15 % NPV ($ million) 93.9 71.0 48.1 23.7 -1.7 -27.0 -53.9 Source: Agnew CPR, 2021
P a g e 124 | 138 Table 19.3.5: NPV sensitivity to changes in discount rate Discount rate 2 % 3 % 3.8 % 5 % NPV ($ million) 22.4 23.2 23.7 24.4 Source: Agnew CPR, 2021 The Qualified person is of the opinion that the tecno-economic model based on the Mineral reserve physicals. The Recent historic assumptions are used to test the Mineral reserve economic assumptions. The material assumptions have been found to be valid and used in the tecno-economic studies. The discounted cash flow has economic viability and a NPV of US$23.7 million at a discount rate of 3.8 %. The IRR has not been presented for this tecno-economic study. The tecno-economic study for the Mineral reserves excludes all inferred Mineral resource material.
P a g e 125 | 138 20 Adjacent properties The Qualified person is unable to verify the information listed for the properties adjacent to Agnew and that the information is not necessarily indicative of the mineralisation on the property that is the subject of this technical report summary. Agnew is essentially stand alone and has no or little reliance of neighbouring properties and the proximity of workings are not expected to interact in any way with Agnew and the lease and permit areas are not overlapping. The Bellevue gold deposit owned by Bellevue Gold Ltd (ASX: BGL) is a material adjacent property to the immediate north of Agnew. The gold deposit currently hosts an indicated Mineral resource of 3.9 Mt at 11.0 g/t Au for 1.4 million contained ounces and an inferred Mineral resource of 5.6 Mt at 9.0 g/t Au for 1.6 million contained ounces (refer to BGL’s ASX announcement dated 8 July 2021). The mineralisation is described by Bellevue Gold as auriferous quartz veins ± sulphides that range from steeply west dipping to shallowly dipping with an overall north-south strike direction. The lodes are associated with a north-northwest trending series of regional shear zones within basalt and are occasionally offset by a series of late-stage, east-trending normal faults and low angle shears. Bellevue Gold completed a Stage 1 feasibility study in February 2021 reporting a probable Mineral reserve of 2.7 Mt at 8.0 g/t Au for 690,000 oz and forecasted average annual gold production from underground of 151,000 oz/a over an initial 7.4 year mine life (refer to BGL’s ASX announcement dated 18 February 2021). Ramelius Resources Ltd (ASX: RMS) is currently mining the Vivien gold deposit located 6.5km to the northeast of the Agnew processing facility. The deposit was acquired from Gold Fields in September 2013 with underground mining below the former open pit commencing in May 2015. The most recent published Mineral reserve for Vivien was a proved and probable reserve of measured 250,000 t @ 6.1 for 48 000 oz, indicated 240,000 t @ 5.1 40,000 oz (refer to RMS’ ASX announcement dated 28 September 2020). Ramelius Resources describes the Vivien mineralisation as occurring within a high-grade quartz vein hosted by a dolerite-gabbro unit. The vein trends north-northeast and dips steeply to the southeast. The quartz vein averages 2.7 m in width and has significant strike and dip continuity (approximately 500 m). The high-grade zones are generally wider and sulphide rich, with pyrrhotite and arsenopyrite being the dominant sulphide species. The Qualified person is unable to verify the publicly disclosed information pertaining to the Bellevue and Vivien gold deposits and notes that this information is not necessarily indicative of the mineralisation within the Agnew property which is mostly concentrated on the western limb of the Lawlers Anticline and is the subject of this technical report summary. To the best of the Qualified persons knowledge, there is no evidence for the gold mineralisation within these adjacent properties extending into the Agnew property. The area immediately surrounding Agnew is also host to several significant deposits of nickel sulphide mineralisation currently being mined by: BHP Billiton Nickel West Pty Ltd at Rockys Reward and Venus some 15km to the north of Leinster. Western Areas Ltd (ASX: WSA) at Odysseus to the immediate north of Agnew. Liontown Resources Ltd (ASX: LTR) has recently completed a pre-feasibility study on its Kathleen Valley lithium- tantalum project to the north of Odysseus. These non-gold projects are not considered by the Qualified person to be material to Gold Fields.
P a g e 126 | 138 21 Other relevant data and information Gold Fields’ commitment to materiality, transparency and competency in its Mineral resources and Mineral reserves disclosure to regulators and in the public domain is of paramount importance to the Qualified person and the registrants Executive Committee and Board of Directors continue to endorse the company’s internal and external review and audit assurance protocols. This Technical Report Summary should be read in totality to gain a full understanding of Agnew’s Mineral resource and Mineral reserve estimation and reporting process, including data integrity, estimation methodologies, modifying factors, mining and processing capacity and capability, confidence in the estimates, economic analysis, risk and uncertainty and overall projected property value. However, to ensure consolidated coverage of the company’s primary internal controls in generating Mineral resource and reserve estimates the following key point summary is provided: (a) A comprehensive quality assurance and quality control (QA/QC) protocol is embedded at Agnew and all Gold Fields operations. It draws on industry leading practice for data acquisition and utilises national standards authority accredited laboratories which are regularly reviewed. Analytical QA/QC is maintained and monitored through the submission of sample blanks, certified reference material and duplicates and umpire laboratory checks. a) Corporate Technical Services (CTS), based in Perth, comprises subject matter experts across the disciplines of geology, resource estimation, geotechnical, mining, engineering, modernisation, capital projects, processing, metallurgy, tailings management and Mineral resource and reserve reporting governance. The Corporate Technical Services (CTS) team budget for regular site visits to all operating mines when emphasis is placed on-site inspection and direct engagement with the technical staff to drive protocols and standards and enable on-site training and upskilling. Corporate Technical Services (CTS) provides technical oversight and guidance to the operating Regions and mines and ensures an additional level of assurance to the Mineral resource and reserve estimates to supplement the mine sites and Regional technical teams. b) Independent audit review of fixed infrastructure is conducted annually with the appointed insurance auditor focused on plant, machinery and mine infrastructure risks. An effective structural and corrosion maintenance programme with benchmark inspections is in place supported by equipment condition monitoring major critical component spares. Focus areas include the primary jaw crusher, ball mill shell or motor failure, structural failure of plant or conveyor, process tank failure and large transformer failure. Critical spares are well resourced and there are no large items not supported by on-site spares holdings. c) Mobile equipment is largely owned and well maintained by the mining contractor, Barminco, with development and haulage units at New Holland owned by Agnew. There is some spare capacity in most of the fleets or within the Barminco group, or hire units are readily available in the region. d) Processing controls include the preparation of quarterly plant metal accounting reconciliation reports by the mine sites which are reviewed by the Regional Metallurgical Manager and VP Metallurgy in the Corporate Technical Services (CTS) team. Any monthly reconciliation variance outside the limits provided within the Gold Fields Plant Metal Accounting Standard is flagged for follow up assessment and remediation if warranted. e) Agnew has a tailings management plan that promotes risk minimisation to operators and stakeholders over the lifecycle of each tailings storage facility (TSF). Agnew’s TSFs are operated in accordance with the company TSF Management Guidelines, which are aligned with the International Council on Metals & Mining’s (ICMM) Position Statement on preventing catastrophic failure of TSFs (December 2016). Active TSFs are subject to an independent, external audit every three years and regular inspections and formal dam safety reviews by formally appointed Engineers of Record (EoR). Further improvements in tailings management are expected to achieve conformance to the new independently developed Global Industry Standard for Tailings Management (GISTM) issued in 2020. f) The integration of environmental, social and governance (ESG) themes into the estimation process continues as an important consideration for modifying factors, reasonable prospects for economic extraction (RPEE) assessments and to underpin the integrity of the Mineral resources and Mineral reserves. The company’s ESG Charter, issues and priorities are fully considered in the life of mine plan with particular emphasis on tailings
P a g e 127 | 138 management, integrated mine closure planning, security of energy and water and the social and regulatory licence to operate. g) Gold Fields also follows an embedded process of third-party reviews to provide expert independent assurance regarding Mineral resource and Mineral reserve estimates and compliance with relevant reporting rules and codes. In line with Gold Fields policy, every material property is reviewed by an independent third-party on average no less than once every three years, or when triggered by a material year-on-year change. Certificates of compliance are received from the companies that conduct the external audits which are also configured to drive continuous improvement in the estimation process. h) Importantly, Gold Fields endorses a well embedded risk and control matrix (RACM) configured to provide an annual assessment of the effectiveness of the registrants’ internal controls concerning the life of mine planning process and Mineral resource and reserve estimation and reporting. i) The internal controls include coverage of the following (inter alia): i Reasonableness of parameters and assumptions used in the Mineral resource and reserve estimation process ii Reasonableness of the interpretations applied to the geological model and estimation techniques iii Integrity in the mine design and scheduling, including reasonableness of the mine planning assumptions, modifying factors, cut-off grades, mining and processing methods and supporting key technical inputs such as year on year reconciliation, geotechnical, mining equipment, infrastructure, water, energy and economic analysis iv Provision of the necessary skills, experience and expertise at the mine sites and the Regions to undertake and complete the work with the required level of technical ability and competency, including professional registration as a Qualified person v Alignment with the SK 1300 rule (guidance and instruction) for the reporting of Mineral resources and reserves vi Review of the disclosure of the registrants’ Mineral resources and reserves process. j) Because of its inherent limitations, internal controls may not prevent or detect all errors or misstatements. Also, projections of any valuation of effectiveness to future periods are subject to risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with policies and procedures may deteriorate. RCubed® is a proprietary cloud-based reporting system adopted by Gold Fields in 2021 to enhance the level governance and data security concerning Mineral resource and reserve reporting across all company properties. It ensures transparency and auditability for all data verification checks, information stage gating, the approvals process and confirmation of Qualified person credentials. The RCubed® reporting system is being incorporated into the SOX RACM matrix to support the December 2021 Mineral resource and reserve reporting.
P a g e 128 | 138 22 Interpretation and conclusions The views expressed in this technical report summary are based on the fundamental assumption that the required management resources and management skills are in place to achieve the Mineral reserve LoM plan projections for Agnew. The Agnew Mineral reserves currently support a 5-year life of mine plan that values the operation at $23.7 million at the reserve gold price of $1,300/oz. Climate change is an integral part of the Mineral reserve generation process and incorporating relevant costs associated with climate change, primarily decarbonisation, mitigation and adaptation to the changing climate, is a key theme for the Company. Integration of these key elements into the Mineral reserve process is being carried out progressively and simultaneously across all of Gold Fields’ sites. Agnew has a solar farm and wind generating capacity as core aspects of its decarbonization strategy. The Mineral reserve estimates contained in this report should not be interpreted as assurances of the economic life or the future profitability of Agnew. Mineral reserves are only estimates based on the factors and assumptions described herein, thus future Mineral reserve estimates may need to be revised. For example, if production costs increase or product prices decrease, a portion of the current Mineral resources, from which the Mineral reserves are derived, may become uneconomic and would therefore result in a lower estimate of Mineral reserves. The LoM plans include forward-looking technical and economic parameters and involve a number of risks and uncertainties that could cause actual results to differ materially. The LoM plan for Agnew has been reviewed in detail by the Qualified person for appropriateness, reasonableness and viability, including the existence of and justification for departure from historical performance. The Qualified person considers that the Technical Economic Parameters and Financial Models are based on sound reasoning, engineering judgement and technically achievable mine plan, within the context of the risk associated with the gold mining industry. The business of gold mining by its nature involves significant risks and hazards, including environmental hazards and industrial accidents. In particular, hazards associated with Gold Fields’ underground mining operations include: Rock bursts. Seismic events. Underground fires and explosions. Cave-ins or gravity falls of ground. Discharges of gases and toxic substances. Flooding. Accidents related to the presence of mobile machinery. Ground and surface water pollution. Ground subsidence. Other accidents and conditions resulting from drilling, blasting and removing and processing material from an underground mine. Hazards associated with Gold Fields’ rock dump, production stockpile mining and tailings deposition include: Accidents associated with operating a rock dump and production stockpile, and rock transportation equipment. Production disruptions due to weather. Ground and surface water pollution. Gold Fields is at risk of experiencing any of these environmental or industrial hazards. The occurrence of any of these hazards could delay or halt production, increase production costs and result in a liability for Gold Fields.
P a g e 129 | 138 The major risks and mitigation actions at Agnew based on a formal risk review and assessment using risk ranking software are summarized in Table . Senior management review and update the risk register on routine basis which is reported on a quarterly basis. Table 22.1.1: Agnew risks and mitigating actions Risk description Risk mitigating action Revenue: Gold Fields does at times enter into forward sales, derivatives or other hedging arrangements in order to establish a price in advance of the sale of its gold production. These decisions are based on the strategic vision of the company as a whole dependent on many factors. Industry data about Gold Fields’ markets obtained from industry surveys, industry publications, market research and other publicly available third-party information. In many cases, statements in this report regarding the gold mining industry and price have been made based on internal surveys, industry forecasts, market research, as well as Gold Fields’ own experiences. Risk mitigation includes price sensitivity analyses at a range of gold prices. Exploration: Exploration activities are focused on replacing production depletion and on growth in Mineral reserves to maintain operational flexibility and sustainability. The Company focuses on the extension of existing orebodies and the discovery and delineation of new ore bodies both at existing sites and at undeveloped sites. Best practices exploration techniques, technical peer reviews and technical specialists are employed to assist in conceptual targeting, execution and interpretation of the exploration programmes. Exploration for gold and other metals associated with gold are speculative in nature involves many risks and is frequently unsuccessful. Geological, geochemical, geophysical, geostatistical and geo- metallurgical techniques are constantly refined to improve effectiveness and the economic viability of prospecting and mining activities. Once a potential orebody has been discovered, exploration is extended and intensified in conjunction with comprehensive infill drilling to enable clearer definition of the orebody and its technical and economic probability. Reserves published do not require any additional discovery. Geology & estimation: The primary assumptions of continuity of the geologically homogenous zones are driven by the geological model, which is updated when new information arises. Any changes to the model are subject to peer and internal technical corporate review and external independent consultant review when deemed necessary. At the Australian operations, the estimation of Mineral reserves for both underground and open pit operations is based on exploration and sampling information gathered through appropriate techniques, primarily from DD, RC and AC drilling techniques. Gold Fields and the sites have well documented processes, procedures and systems to ensure the drilling, logging, sampling, interpretation, orebody and lithological modelling, and estimation are appropriately completed. Overall staff focus is on geology recruitment with required expertise and skills, training, coupled with field and peer reviews by both site and corporate staff integrated into routine exploration and mining geology. Internal and external corporate audits, procedures and systems all enhance and support ongoing periodic review. All models are documented with peer reviews and model on model reconciliations to explore and understand the impacts of additional information, data and interpretation / methodology to support delivery of the most appropriate and best-informed outcomes Applications of alternative estimation methods to evaluate deposits are also routinely compiled to ensure the most relevant and appropriate estimation for mine planning is delivered. This may include considering OK, SK, and simulation. Conditional estimation techniques to validate and inform options and decisions are also considered. The locations of sample points are spaced close enough to deduce or confirm geological and grade continuity. Generally, drilling is undertaken on grids, which range between 10 m by 10 m up to 40 m by 40 m, although this may vary depending on the continuity of the orebody. Due to the variety and diversity of mineralisation at the Australian operations, sample spacing may also vary depending on each particular ore type. Mine planning & scheduling Changes in assumptions underlying Gold Fields’ Mineral reserve estimates risk. Modifying factors used to calculate the cut-off grades include adjustments to mill delivered amounts due to dilution and ore loss
P a g e 130 | 138 Risk description Risk mitigating action incurred in the course of mining, expected return on investment, and sustaining capital. These may change but typically are reviewed and managed through detailed reconciliation processes to minimize variations and impacts. Modifying factors applied in estimating reserves are primarily based on historical empirical information, but commonly incorporate adjustments for planned operational improvements. Mineral reserves also take into account operating cost levels as well as necessary capital and sustaining capital provisions required at each operation and are supported by life of mine plans. Detail planning protocols and review processes by qualified and experienced technical staff both on site and regional levels are held to ensure consistency and applicability of due process. Mining execution The ability to achieve anticipated efficiencies and production plans due to nature of risk and impacts associated with normal mining routine activities. These could include geotechnical, equipment and maintenance, explosives, staffing, power and water supply. Benchmarking and technical reviews of all mine plans to validate and test assumptions are normal Mineral resource & reserve processes. Assumptions applied in estimating mine planning for Mineral reserves are primarily based on historical empirical information, but commonly incorporate adjustments for planned operational performance. Geotechnical evaluation and monitoring, seismic systems and open cut slope wall rock monitoring are all normal processes to mitigate risk. Equipment planned schedule and maintenance programmes and condition monitoring processes are in place to ensure production capability. Social licence to operate: Many mining companies face increasing pressure over their “social licence to operate” which can be understood as the acceptance of the activities of these companies by local stakeholders. While formal permission to operate is ultimately granted by host governments, many mining activities require social permission from host communities and influential stakeholders to carry out operations effectively and profitably. This aspect could impact future Mineral reserves & resources mining activity and delivery. To maintain its social licence to operate, Gold Fields may need to design or redesign parts of its mining operations to minimize their impact on such communities and the environment, either by changing mining plans to avoid such impact, by modifying operations, changing planned capital expenditures or by relocating the affected people to an agreed location. Responsive measures may require Gold Fields to take costly and time- consuming remedial measures, including the full restoration of livelihoods of those impacted. Staffing & technical capability: Gold Fields’ ability to operate or expand effectively depends largely on the experience, skills and performance of its senior management team and technically skilled employees. Gold Fields operates in a good labour market and stable political jurisdiction which adapts recruitment, staff development / retention policies to meet labour and staffing demand to support and deliver on operations. Environmental and industrial accidents: Gold mining by its nature involves significant risks and hazards, including environmental hazards and industrial and mining accidents. These may include, for example, seismic events, fires, cave-ins and blockages, flooding, discharges of gases and toxic substances, contamination of water, air or soil resources, radioactivity and other accidents or conditions resulting from mining activities including, among other things, blasting and the transport, storage and handling of hazardous materials. Gold Fields has appropriate staffing structures and processes and programmes which manage, monitor and report on key environmental, health and safety compliance. Gold Fields also subscribes to a number of international regulatory frameworks (e.g., ISO14001, ISO18001, ISO45001, Cyanide Code) which include process and external audits review and monitoring for compliance. Notes: a) The Qualified person is of the opinion that the risks identified have reasonable risk mitigations and that action plans current and future will not materially affect the life of mine reserve estimation Source: Agnew CPR 2021
P a g e 131 | 138 23 Recommendations The Agnew Mineral reserves currently support a 6-year LoM plan that values the operation at $23.7 million at the reserve gold price of $1,300/oz. It is recommended that further exploration is carried out at the Waroonga Complex, New Holland Complex and the Redeemer Complex which has a good probability of extending mine life.
P a g e 132 | 138 24 References The primary reference documents that have written consent by the appointed Gold Fields Lead Qualified persons technical report summary are. Primary reference is the Agnew Competent Person Report 31 December 2021 for Mineral resources and Mineral reserves. This report has written consent from Pieter Burge who is the Gold Fields appointed Lead Competent Person or Qualified person for Agnew Gold Mine. Peter has accepted responsibility for the Competent Person Report 31 December 2021 for Mineral resources and Mineral reserves as a whole. The Agnew Competent Person Report 31 December 2021 for Mineral resources and Mineral reserves is referred to in this document as “Agnew CPR 2021”.
P a g e 133 | 138 25 Reliance on information provided by the registrant The competent person has not identified any information provided by the registrant for Agnew that requires noting under the reliance on information provided.
P a g e 134 | 138 26 Definitions 26.1 Adequate geological evidence When used in the context of Mineral resource determination, means evidence that is sufficient to establish geological and grade or quality continuity with reasonable certainty. 26.2 Conclusive geological evidence When used in the context of Mineral resource determination, means evidence that is sufficient to test and confirm geological and grade or quality continuity. 26.3 Cutoff grade Is the grade (i.e., the concentration of metal or mineral in rock) that determines the destination of the material during mining. For purposes of establishing “prospects of economic extraction,” the cutoff grade is the grade that distinguishes material deemed to have no economic value (it will not be mined in underground mining or if mined in surface mining, its destination will be the waste dump) from material deemed to have economic value (its ultimate destination during mining will be a processing facility). Other terms used in similar fashion as cutoff grade include net smelter return, pay limit, and break-even stripping ratio. 26.4 Development stage issuer Is an issuer that is engaged in the preparation of Mineral reserves for extraction on at least one Material property. 26.5 Development stage property Is a property that has Mineral reserves disclosed, pursuant to this subpart, but no material extraction. 26.6 Economically viable When used in the context of Mineral reserve determination, means that the Qualified person has determined, using a discounted cash flow analysis, or has otherwise analytically determined, that extraction of the Mineral reserve is economically viable under reasonable Investment and market assumptions. 26.7 Exploration results Are data and information generated by mineral exploration programs (i.e., programs consisting of sampling, drilling, trenching, analytical testing, assaying, and other similar activities undertaken to locate, investigate, define or delineate a mineral prospect or mineral deposit) that are not part of a disclosure of Mineral resources or Mineral reserves. A Registrant must not use exploration results alone to derive estimates of tonnage, grade, and production rates, or in an assessment of economic viability. 26.8 Exploration stage issuer Is an issuer that has no Material property with Mineral reserves disclosed. 26.9 Exploration stage property Is a property that has no Mineral reserves disclosed. 26.10 Exploration target Is a statement or estimate of the exploration potential of a mineral deposit in a defined geological setting where the statement or estimate, quoted as a range of tonnage and a range of grade (or quality), relates to mineralisation for which there has been insufficient exploration to estimate a Mineral resource.
P a g e 135 | 138 26.11 Feasibility study Is a comprehensive technical and economic study of the selected development option for a mineral project, which includes detailed assessments of all applicable Modifying factors, as defined by this section, together with any other relevant operational factors, and detailed financial analysis that are necessary to demonstrate, at the time of reporting, that extraction is Economically viable. The results of the study may serve as the basis for a final decision by a proponent or financial institution to proceed with, or finance, the development of the project. 1. A feasibility study is more comprehensive, and with a higher degree of accuracy, than a Preliminary feasibility study (or pre-feasibility study). It must contain mining, infrastructure, and process designs completed with sufficient rigor to serve as the basis for an investment decision or to support project financing. 2. The confidence level in the results of a feasibility study is higher than the confidence level in the results of a Preliminary feasibility study (or pre-feasibility study). Terms such as full, final, comprehensive, bankable, or definitive feasibility study are equivalent to a feasibility study. 26.12 Final market study Is a comprehensive study to determine and support the existence of a readily accessible market for the mineral. It must, at a minimum, include product specifications based on final geologic and metallurgical testing, supply and demand forecasts, historical prices for the preceding five or more years, estimated long term prices, evaluation of competitors (including products and estimates of production volumes, sales, and prices), customer evaluation of product specifications, and market entry strategies or sales contracts. The study must provide justification for all assumptions, which must include assumptions concerning the Material contracts required to develop and sell the Mineral reserves. 26.13 Indicated Mineral resource Is that part of a Mineral resource for which quantity and grade or quality are estimated on the basis of Adequate geological evidence and sampling. The level of geological certainty associated with an indicated Mineral resource is sufficient to allow a Qualified person to apply Modifying factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Because an indicated Mineral resource has a lower level of confidence than the level of confidence of a Measured Mineral resource, an indicated Mineral resource may only be converted to a Probable Mineral reserve. 26.14 Inferred Mineral resource Is that part of a Mineral resource for which quantity and grade or quality are estimated on the basis of Limited geological evidence and sampling. The level of geological uncertainty associated with an inferred Mineral resource is too high to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation of economic viability. Because an inferred Mineral resource has the lowest level of geological confidence of all Mineral resources, which prevents the application of the Modifying factors in a manner useful for evaluation of economic viability, an inferred Mineral resource may not be considered when assessing the economic viability of a mining project, and may not be converted to a Mineral reserve. 26.15 Initial assessment Is a preliminary technical and economic study of the economic potential of all or parts of mineralisation to support the disclosure of Mineral resources. The initial assessment must be prepared by a Qualified person and must include appropriate assessments of reasonably assumed technical and economic factors, together with any other relevant operational factors, that are necessary to demonstrate at the time of reporting that there are reasonable prospects for economic extraction. An initial assessment is required for disclosure of Mineral resources but cannot be used as the basis for disclosure of Mineral reserves. 26.16 Investment and market assumptions When used in the context of Mineral reserve determination, includes all assumptions made about the prices, exchange rates, interest and discount rates, sales volumes, and costs that are necessary to determine the economic viability of the
P a g e 136 | 138 Mineral reserves. The Qualified person must use a price for each commodity that provides a reasonable basis for establishing that the project is Economically viable. 26.17 Limited geological evidence When used in the context of Mineral resource determination, means evidence that is only sufficient to establish that geological and grade or quality continuity are more likely than not. 26.18 Material Has the same meaning as under Part 230.405 or Part 240.12b-2. The term material, when used to qualify a requirement for the furnishing of information as to any subject, limits the information required to those matters to which there is a substantial likelihood that a reasonable investor would attach importance in determining whether to purchase the security registered. 26.19 Material of economic interest When used in the context of Mineral resource determination, includes mineralisation, including dumps and tailings, mineral brines, and other resources extracted on or within the earth's crust. It does not include oil and gas resources resulting from oil and gas producing activities, as defined in Part 210.4-10(a)(16)(i) of this chapter, gases (e.g., helium and carbon dioxide), geothermal fields, and water. 26.20 Measured Mineral resource Is that part of a Mineral resource for which quantity and grade or quality are estimated on the basis of Conclusive geological evidence and sampling. The level of geological certainty associated with a measured Mineral resource is sufficient to allow a Qualified person to apply Modifying factors, as defined in this section, in sufficient detail to support detailed mine planning and final evaluation of the economic viability of the deposit. Because a measured Mineral resource has a higher level of confidence than the level of confidence of either an Indicated Mineral resource or an Inferred Mineral resource, a measured Mineral resource may be converted to a Proven Mineral reserve or to a Probable Mineral reserve. 26.21 Mineral reserve Is an estimate of tonnage and grade or quality of Indicated Mineral resources and Measured Mineral resources that, in the opinion of the Qualified person, can be the basis of an Economically viable project. More specifically, it is the economically mineable part of a measured or Indicated Mineral resource, which includes diluting materials and allowances for losses that may occur when the material is mined or extracted. 26.22 Mineral resource Is a concentration or occurrence of Material of economic interest in or on the Earth's crust in such form, grade or quality, and quantity that there are reasonable prospects for economic extraction. A Mineral resource is a reasonable estimate of mineralisation, taking into account relevant factors such as Cutoff grade, likely mining dimensions, location or continuity, that, with the assumed and justifiable technical and economic conditions, is likely to, in whole or in part, become economically extractable. It is not merely an inventory of all mineralisation drilled or sampled. 26.23 Modifying factors Are the factors that a Qualified person must apply to Indicated Mineral resources and Measured Mineral resources and then evaluate in order to establish the economic viability of Mineral reserves. A Qualified person must apply and evaluate modifying factors to convert Measured Mineral resources and Indicated Mineral resources to Proven Mineral reserves and Probable Mineral reserves. These factors include, but are not restricted to: Mining; processing; metallurgical; infrastructure; economic; marketing; legal; environmental compliance; plans, negotiations, or agreements with local individuals or groups; and governmental factors. The number, type and specific characteristics
P a g e 137 | 138 of the modifying factors applied will necessarily be a function of and depend upon the mineral, mine, property, or project. 26.24 Preliminary feasibility study (or pre-feasibility study) Is a comprehensive study of a range of options for the technical and economic viability of a mineral project that has advanced to a stage where a Qualified person has determined (in the case of underground mining) a preferred mining method, or (in the case of surface mining) a pit configuration, and in all cases has determined an effective method of mineral processing and an effective plan to sell the product. 1. A pre-feasibility study includes a financial analysis based on reasonable assumptions, based on appropriate testing, about the Modifying factors and the evaluation of any other relevant factors that are sufficient for a Qualified person to determine if all or part of the Indicated Mineral resources and Measured Mineral resources may be converted to Mineral reserves at the time of reporting. The financial analysis must have the level of detail necessary to demonstrate, at the time of reporting, that extraction is Economically viable. 2. A pre-feasibility study is less comprehensive and results in a lower confidence level than a Feasibility study. A pre-feasibility study is more comprehensive and results in a higher confidence level than an Initial assessment. 26.25 Preliminary market study Is a study that is sufficiently rigorous and comprehensive to determine and support the existence of a readily accessible market for the mineral. It must, at a minimum, include product specifications based on preliminary geologic and metallurgical testing, supply and demand forecasts, historical prices for the preceding five or more years, estimated long term prices, evaluation of competitors (including products and estimates of production volumes, sales, and prices), customer evaluation of product specifications, and market entry strategies. The study must provide justification for all assumptions. It can, however, be less rigorous and comprehensive than a Final market study, which is required for a full Feasibility study. 26.26 Probable Mineral reserve Is the economically mineable part of an Indicated Mineral resource and, in some cases, a Measured Mineral resource. 26.27 Production stage issuer Is an issuer that is engaged in material extraction of Mineral reserves on at least one Material property. 26.28 Production stage property Is a property with material extraction of Mineral reserves. 26.29 Proven Mineral reserve Is the economically mineable part of a Measured Mineral resource and can only result from conversion of a Measured Mineral resource. 26.30 Qualified person Is an individual who is: 1. A mineral industry professional with at least five years of Relevant experience in the type of mineralisation and type of deposit under consideration and in the specific type of activity that person is undertaking on behalf of the Registrant; and 2. An eligible member or licensee in good standing of a recognised professional organisation at the time the technical report is prepared. For an organisation to be a recognised professional organisation, it must: i Be either: A. An organisation recognised within the mining industry as a reputable professional association; or
P a g e 138 | 138 B. A board authorised by U.S. federal, state or foreign statute to regulate professionals in the mining, geoscience or related field; ii Admit eligible members primarily on the basis of their academic qualifications and experience; iii Establish and require compliance with professional standards of competence and ethics; iv Require or encourage continuing professional development; v Have and apply disciplinary powers, including the power to suspend or expel a member regardless of where the member practices or resides; and vi Provide a public list of members in good standing. 26.31 Relevant experience Means, for purposes of determining whether a party is a Qualified person, that the party has experience in the specific type of activity that the person is undertaking on behalf of the Registrant. If the Qualified person is preparing or supervising the preparation of a technical report concerning Exploration results, the relevant experience must be in exploration. If the Qualified person is estimating, or supervising the estimation of Mineral resources, the relevant experience must be in the estimation, assessment and evaluation of Mineral resources and associated technical and economic factors likely to influence the prospect of economic extraction. If the Qualified person is estimating, or supervising the estimation of Mineral reserves, the relevant experience must be in engineering and other disciplines required for the estimation, assessment, evaluation and economic extraction of Mineral reserves. 1. Relevant experience also means, for purposes of determining whether a party is a Qualified person, that the party has experience evaluating the specific type of mineral deposit under consideration (e.g., coal, metal, base metal, industrial mineral, or mineral brine). The type of experience necessary to qualify as relevant is a facts and circumstances determination. For example, experience in a high-nugget, vein-type mineralisation such as tin or tungsten would likely be relevant experience for estimating Mineral resources for vein-gold mineralisation, whereas experience in a low grade disseminated gold deposit likely would not be relevant. Note 1 to paragraph (1) of the definition of relevant experience: It is not always necessary for a person to have five years' experience in each and every type of deposit in order to be an eligible Qualified person if that person has relevant experience in similar deposit types. For example, a person with 20 years' experience in estimating Mineral resources for a variety of metalliferous hard-rock deposit types may not require as much as five years of specific experience in porphyry-copper deposits to act as a Qualified person. Relevant experience in the other deposit types could count towards the experience in relation to porphyry-copper deposits. 2. For a Qualified person providing a technical report for Exploration results or Mineral resource estimates, relevant experience also requires, in addition to experience in the type of mineralisation, sufficient experience with the sampling and analytical techniques, as well as extraction and processing techniques, relevant to the mineral deposit under consideration. Sufficient experience means that level of experience necessary to be able to identify, with substantial confidence, problems that could affect the reliability of data and issues associated with processing. 3. For a Qualified person applying the Modifying factors, as defined by this section, to convert Mineral resources to Mineral reserves, relevant experience also requires: i Sufficient knowledge and experience in the application of these factors to the mineral deposit under consideration; and ii Experience with the geology, geostatistics, mining, extraction and processing that is applicable to the type of mineral and mining under consideration.
Date and Signature Page Qualified Person Signature Date Dr Julian Verbeek /s/ Dr. Julian Verbeek 27 March 2022 Richard Butcher /s/ Richard Butcher 28 March 2022 Dr Winfred Assibey-Bonsu /s/ Dr Winfred Assibey-Bonsu 27 March 2022 Andrew Engelbrecht /s/ Andrew Engelbrecht 28 March 2022 Peter Andrews /s/ Peter Andrews 27 March 2022 Daniel Hillier /s/ Daniel Hillier 28 March 2022 Johan Boshoff /s/ Johan Boshoff 28 March 2022 Andre Badenhorst /s/ Andre Badenhorst 27 March 2022 Fiona Phillips /s/ Fiona Phillips 29 March 2022 Trent Strickland /s/ Trent Strickland 29 March 2022 Peter Burge /s/ Peter Burge 29 March 2022 Neil Morris /s/ Neil Morris 29 March 2022 Stephanie Gotley /s/ Stephanie Gotley 29 March 2022
Exhibit 96.6 P a g e 1 | 136 Goldfields.com Technical Report Summary for Mineral reserves and Mineral resources 31 December 2021 for Gold Fields Limited – Granny Smith Gold Mine – Australia P a g e 2 | 136 Table of Contents 1 Executive Summary ............................................................................................................................................................. 8 1.1 Property description and ownership ............................................................................................................................ 8 1.2 Geology and mineralisation ........................................................................................................................................ 8 1.3 Exploration, development and operations ................................................................................................................. 11 1.4 Mineral resource estimates ........................................................................................................................................ 12 1.5 Mineral reserve estimates .......................................................................................................................................... 13 1.6 Capital and operating cost estimates ......................................................................................................................... 14 1.7 Permitting .................................................................................................................................................................. 14 1.8 Conclusions and recommendations ........................................................................................................................... 15 2 Introduction......................................................................................................................................................................... 16 2.1 Registrant for whom the technical report summary was prepared............................................................................. 16 2.2 Terms of reference and purpose of the technical report summary ............................................................................. 16 2.3 Sources of information .............................................................................................................................................. 16 2.4 Qualified persons and details of inspection ............................................................................................................... 17 2.5 Report version update ............................................................................................................................................... 17 3 Property description ........................................................................................................................................................... 18 3.1 Property location ....................................................................................................................................................... 18 3.2 Ownership and area ................................................................................................................................................... 18 3.3 Property mineral titles, claims, mineral rights, leases and options ............................................................................ 18 3.4 Mineral rights description ......................................................................................................................................... 23 3.5 Encumbrances ........................................................................................................................................................... 24 3.6 Other significant factors and risks ............................................................................................................................. 25 3.7 Royalties or similar interest....................................................................................................................................... 25 4 Accessibility, climate, local resources, infrastructure and physiography .................................................................... 26 4.1 Topography, elevation, and vegetation ..................................................................................................................... 26 4.2 Access ....................................................................................................................................................................... 26 4.3 Climate ...................................................................................................................................................................... 26 4.4 Infrastructure ............................................................................................................................................................. 26 4.5 Book Value ............................................................................................................................................................... 27 5 History .................................................................................................................................................................................. 28 6 Geological setting and mineralisation .............................................................................................................................. 29 6.1 Geological setting ..................................................................................................................................................... 29 6.2 Mineralisation ........................................................................................................................................................... 29 6.2.1 Granny Smith corridor ...................................................................................................................................... 29 6.2.2 Wallaby ............................................................................................................................................................. 33 6.2.3 Hillside .............................................................................................................................................................. 36 7 Exploration .......................................................................................................................................................................... 37 7.1 Exploration ................................................................................................................................................................ 37 7.2 Drilling ...................................................................................................................................................................... 37 7.2.1 Type and extent ................................................................................................................................................. 37 7.2.2 Procedures ......................................................................................................................................................... 38 7.2.3 Results ............................................................................................................................................................... 40 7.3 Hydrogeology ........................................................................................................................................................... 41 7.3.1 Groundwater Levels .......................................................................................................................................... 42 7.3.2 Aquifer Permeability ......................................................................................................................................... 42 7.3.3 Dewatering ........................................................................................................................................................ 43 7.4 Geotechnical ............................................................................................................................................................. 43 7.4.1 Rock mass properties ........................................................................................................................................ 43 P a g e 3 | 136 7.4.2 QA/QC of geotechnical data ............................................................................................................................. 44 7.5 Density ...................................................................................................................................................................... 45 8 Sample preparation, analyses, and security .................................................................................................................... 46 8.1 Sample preparation ................................................................................................................................................... 46 8.2 Sample analysis ......................................................................................................................................................... 49 8.3 Quality control and quality assurance (QA/QC) ....................................................................................................... 49 9 Data verification ................................................................................................................................................................. 53 9.1 Data management ...................................................................................................................................................... 53 9.2 Plant Sampling .......................................................................................................................................................... 54 9.3 Drilling ...................................................................................................................................................................... 54 9.4 Sampling ................................................................................................................................................................... 54 9.5 Survey ....................................................................................................................................................................... 54 9.6 Sample analysis ......................................................................................................................................................... 55 9.6.1 Metallurgical Tests ............................................................................................................................................ 56 9.7 Quality Control/Quality Assurance Process .............................................................................................................. 56 9.7.1 Umpire sampling ............................................................................................................................................... 57 9.8 Bulk Density ............................................................................................................................................................. 57 9.9 Geological modelling ................................................................................................................................................ 57 10 Mineral processing and metallurgical testing ................................................................................................................. 59 10.1 Testing and procedures ............................................................................................................................................. 59 10.1.1 Background ....................................................................................................................................................... 59 10.1.2 Metallurgical sampling & testing ...................................................................................................................... 59 10.2 Relevant results ......................................................................................................................................................... 60 10.2.1 Sample Head Analysis ...................................................................................................................................... 60 10.2.2 Metallurgical recovery ...................................................................................................................................... 61 10.2.3 Ore hardness ...................................................................................................................................................... 63 10.3 Plant Sampling .......................................................................................................................................................... 64 10.4 Deleterious Elements ................................................................................................................................................ 64 10.5 Metallurgical Risks ................................................................................................................................................... 65 10.5.1 Sample Representativity .................................................................................................................................... 65 10.5.2 Laboratory Test Methods and Scale-up ............................................................................................................. 65 10.5.3 Deleterious Elements ........................................................................................................................................ 66 10.5.4 End-2021 Reserves recovery estimation model ................................................................................................. 66 11 Mineral resource estimates ................................................................................................................................................ 67 11.1 Mineral resources estimation criteria ........................................................................................................................ 67 11.1.1 Geological model and interpretation ................................................................................................................. 67 11.1.2 Compositing ...................................................................................................................................................... 67 11.1.3 Block modelling ................................................................................................................................................ 68 11.1.4 Bulk density ...................................................................................................................................................... 68 11.1.5 Top cuts ............................................................................................................................................................. 68 11.1.6 Variography ...................................................................................................................................................... 68 11.1.7 Grade estimation ............................................................................................................................................... 69 11.1.8 Selective mining units ....................................................................................................................................... 69 11.1.9 Model validation ............................................................................................................................................... 69 11.1.10 Cutoff grades ..................................................................................................................................................... 70 11.1.11 Reasonable prospects of economic extraction ................................................................................................... 73 11.1.12 Classification criteria ........................................................................................................................................ 73 11.2 Mineral resources as of 31 December 2021 .............................................................................................................. 75 11.3 Audits and reviews .................................................................................................................................................... 76 11.4 Comparison with 31 December 2020 Mineral resource ............................................................................................ 76 12 Mineral reserve estimates .................................................................................................................................................. 77 P a g e 4 | 136 12.1 Level of assessment .................................................................................................................................................. 77 12.2 Mineral reserve estimation criteria ............................................................................................................................ 78 12.2.1 Recent mine performance .................................................................................................................................. 78 12.2.2 Key assumptions and parameters ...................................................................................................................... 78 12.2.3 Cutoff grades ..................................................................................................................................................... 81 12.2.4 Mine design and planning ................................................................................................................................. 81 12.2.5 Mine planning and schedule .............................................................................................................................. 83 12.2.6 Processing schedule .......................................................................................................................................... 85 12.2.7 Classification criteria ........................................................................................................................................ 85 12.2.8 Economic assessment ........................................................................................................................................ 85 12.3 Mineral reserves as of 31 December 2021 ................................................................................................................ 86 12.4 Audits and reviews .................................................................................................................................................... 87 12.5 Comparison with 31 December 2020 Mineral reserve .............................................................................................. 87 13 Mining methods .................................................................................................................................................................. 89 13.1 Geotechnical and hydrological models ..................................................................................................................... 89 13.1.1 Hydrogeological model ..................................................................................................................................... 89 13.1.2 Geotechnical model ........................................................................................................................................... 89 13.2 Mining methods ........................................................................................................................................................ 91 13.2.1 Inclined room and pillar (IRP) .......................................................................................................................... 91 13.2.2 Transverse longhole stoping (TLHS) ................................................................................................................ 92 13.2.3 Sub-level longhole stoping (SLHS) with paste fill ............................................................................................ 92 13.2.4 Bulk longhole stoping ....................................................................................................................................... 92 13.3 Equipment and labour requirements .......................................................................................................................... 94 14 Processing and recovery methods ..................................................................................................................................... 95 14.1 Flow sheet and design ............................................................................................................................................... 95 14.2 Recent process plant performance ............................................................................................................................. 96 14.3 Process plant requirements ........................................................................................................................................ 96 14.4 Processing Risks ....................................................................................................................................................... 97 14.4.1 Major Equipment Failure .................................................................................................................................. 97 14.4.2 Plant Operational Management ......................................................................................................................... 97 14.4.3 Operating Costs, Plant Consumables and Reagents .......................................................................................... 98 15 Infrastructure ...................................................................................................................................................................... 99 15.1 Tailings storage facilities (TSF) ................................................................................................................................ 99 15.2 Waste rock dumps ................................................................................................................................................... 101 15.3 Water ....................................................................................................................................................................... 102 15.4 Power ...................................................................................................................................................................... 103 15.5 Accommodation ...................................................................................................................................................... 103 15.6 Site access ............................................................................................................................................................... 103 15.7 Other infrastructure ................................................................................................................................................. 103 16 Market studies ................................................................................................................................................................... 105 16.1 Preliminary market study ........................................................................................................................................ 105 16.2 Metal Price history .................................................................................................................................................. 107 17 Environmental studies, permitting, and plans, negotiations, or agreements with local individuals or groups .... 108 17.1 Permitting ................................................................................................................................................................ 108 17.1.1 Commonwealth ............................................................................................................................................... 108 17.1.2 State ................................................................................................................................................................ 108 17.1.3 Granny Smith permitting ................................................................................................................................. 109 17.2 Environmental studies ............................................................................................................................................. 110 17.3 Waste disposal, monitoring and water management ............................................................................................... 110 17.3.1 Tailings storage facilities (TSF) ...................................................................................................................... 111 17.3.2 Waste rock dumps ........................................................................................................................................... 112
P a g e 5 | 136 17.3.3 Water management.......................................................................................................................................... 113 17.4 Social and community ............................................................................................................................................. 114 17.5 Mine closure............................................................................................................................................................ 115 18 Capital and operating costs ............................................................................................................................................. 116 18.1 Capital costs ............................................................................................................................................................ 116 18.2 Operating costs ........................................................................................................................................................ 116 19 Economic analysis ............................................................................................................................................................. 118 19.1 Key inputs and assumptions .................................................................................................................................... 118 19.2 Economic analysis ................................................................................................................................................... 119 19.3 Sensitivity analysis .................................................................................................................................................. 119 20 Adjacent properties .......................................................................................................................................................... 120 21 Other relevant data and information ............................................................................................................................. 121 22 Interpretation and conclusions ....................................................................................................................................... 123 22.1 Major risks and mitigation actions .......................................................................................................................... 124 23 Recommendations ............................................................................................................................................................ 126 24 References .......................................................................................................................................................................... 127 25 Reliance on information provided by the Registrant ................................................................................................... 128 26 Definitions .......................................................................................................................................................................... 129 26.1 Adequate geological evidence ................................................................................................................................. 129 26.2 Conclusive geological evidence .............................................................................................................................. 129 26.3 Cutoff grade ............................................................................................................................................................ 129 26.4 Development stage issuer ........................................................................................................................................ 129 26.5 Development stage property.................................................................................................................................... 129 26.6 Economically viable ................................................................................................................................................ 129 26.7 Exploration results .................................................................................................................................................. 129 26.8 Exploration stage issuer .......................................................................................................................................... 129 26.9 Exploration stage property ...................................................................................................................................... 129 26.10 Exploration target .................................................................................................................................................... 129 26.11 Feasibility study ...................................................................................................................................................... 130 26.12 Final market study ................................................................................................................................................... 130 26.13 Indicated Mineral resource ...................................................................................................................................... 130 26.14 Inferred Mineral resource ........................................................................................................................................ 130 26.15 Initial assessment .................................................................................................................................................... 130 26.16 Investment and market assumptions ........................................................................................................................ 130 26.17 Limited geological evidence ................................................................................................................................... 131 26.18 Material ................................................................................................................................................................... 131 26.19 Material of economic interest .................................................................................................................................. 131 26.20 Measured Mineral resource ..................................................................................................................................... 131 26.21 Mineral reserve ....................................................................................................................................................... 131 26.22 Mineral resource ..................................................................................................................................................... 131 26.23 Modifying factors .................................................................................................................................................... 131 26.24 Preliminary feasibility study (or pre-feasibility study) ............................................................................................ 132 26.25 Preliminary market study ........................................................................................................................................ 132 26.26 Probable Mineral reserve ........................................................................................................................................ 132 26.27 Production stage issuer ............................................................................................................................................ 132 26.28 Production stage property ....................................................................................................................................... 132 26.29 Proven Mineral reserve ........................................................................................................................................... 132 26.30 Qualified person ...................................................................................................................................................... 132 26.31 Relevant experience ................................................................................................................................................ 133 P a g e 6 | 136 List of Tables Table 1.4.1: Granny Smith - summary of gold Mineral resources as at 31 December 2021 (fiscal year end) based on a gold price of $1,500/oz ...................................................................................................................................................... 12 Table 1.5.1: Granny Smith - summary of gold Mineral reserves at 31 December 2021 (fiscal year end) based on a gold price of $1,300/oz ................................................................................................................................................................... 13 Table 1.6.1: Capital costs ($ million) ............................................................................................................................................... 14 Table 1.6.2: Operating costs ($ million) ........................................................................................................................................... 14 Table 2.4.1: List of Qualified persons .............................................................................................................................................. 17 Table 3.3.1: List of Granny Smith tenements................................................................................................................................... 21 Table 7.2.1: Summary of Granny Smith drilling – 2021 .................................................................................................................. 37 Table 7.3.1: Estimated horizontal groundwater gradients ................................................................................................................ 42 Table 7.3.2: Derived Permeability Parameters ................................................................................................................................ 42 Table 7.4.1: Required representative samples for laboratory testing ................................................................................................ 43 Table 7.5.1: Granny Smith density values ....................................................................................................................................... 45 Table 7.5.2: Wallaby density values ................................................................................................................................................ 45 Table 7.5.3: Hillside density values ................................................................................................................................................. 45 Table 8.1.1: Analytical laboratory accreditation .............................................................................................................................. 46 Table 8.3.1: Quality control type summary ...................................................................................................................................... 50 Table 8.3.2: Recent reviews of Australian Laboratory Services (ALS) Kalgoorlie laboratory ........................................................ 51 Table 8.3.3: Recent reviews of Australian Laboratory Services (ALS) Perth laboratory ................................................................. 52 Table 9.7.1: Quality Control type summary ..................................................................................................................................... 57 Table 10.2.1: Summary of Wallaby zone average sample head analysis ......................................................................................... 61 Table 10.2.2: Summary of metallurgical samples/tests quantities and summary of average recovery results .................................. 62 Table 10.2.3: Summary metallurgical recoveries estimate by ore source (geological zone) ............................................................ 62 Table 10.2.4: Summary of hardness indices and power requirements estimates for Wallaby underground ..................................... 64 Table 11.1.1: Summary of December 2021 Mineral resource estimation parameters ...................................................................... 68 Table 11.1.2: Open pit resource cutoff grades ................................................................................................................................. 70 Table 11.1.3: Underground resource cutoff grades .......................................................................................................................... 71 Table 11.2.1: Granny Smith - summary of gold Mineral resources at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,500/oz ...................................................................................................................................... 75 Table 12.2.1: Recent operating statistics .......................................................................................................................................... 78 Table 12.2.2: Summary of material modifying factors..................................................................................................................... 79 Table 12.2.3: Underground reserve cutoff grades ............................................................................................................................ 81 Table 12.2.4: Equipment availabilities and utilisation ..................................................................................................................... 84 Table 12.3.1: Granny Smith - summary of gold Mineral reserves at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,300/oz ...................................................................................................................................... 86 Table 12.5.1: Net difference in Mineral reserves between 31 December 2020 and 31 December 2021 .......................................... 87 Table 13.2.1: Mining Dilution and recovery factors for each mining method ................................................................................. 93 Table 13.3.1: Underground mining fleet .......................................................................................................................................... 94 Table 14.3.1: Granny Smith process plant – key requirements ........................................................................................................ 97 Table 16.1.1: Reserve and Resource metal prices .......................................................................................................................... 105 Table 17.1.1: List of Granny Smith permits ................................................................................................................................... 110 Table 18.1.1: Capital costs ($ million) ........................................................................................................................................... 116 Table 18.2.1: Operating costs ($ million) ....................................................................................................................................... 116 Table 18.2.2: Post LoM costs ......................................................................................................................................................... 117 Table 19.1.1: LoM physicals .......................................................................................................................................................... 118 Table 19.1.2: LoM cost and revenue assumptions – Breakdown of ESG ...................................................................................... 119 Table 19.3.1: NPV sensitivity to changes in gold price ................................................................................................................. 119 P a g e 7 | 136 Table 19.3.2: NPV sensitivity to changes in grade......................................................................................................................... 119 Table 19.3.3: NPV sensitivity to changes in capital costs .............................................................................................................. 119 Table 19.3.4: NPV sensitivity to changes in operating costs.......................................................................................................... 119 Table 19.3.5: NPV sensitivity to changes in discount rate ............................................................................................................. 119 Table 22.1.1: Risks and mitigating actions .................................................................................................................................... 124 List of Figures Figure 1.2.1: Location of Granny Smith ............................................................................................................................................ 9 Figure 3.3.1: Granny Smith operating sites and infrastructure ......................................................................................................... 19 Figure 3.3.2: Granny Smith mineral titles ........................................................................................................................................ 20 Figure 6.2.1: Granny Smith – regional geology ............................................................................................................................... 30 Figure 6.2.2: Granny Smith – stratigraphic section .......................................................................................................................... 31 Figure 6.2.3: Geology of the Granny Smith mineralised corridor .................................................................................................... 32 Figure 6.2.4: Wallaby lodes and intrusive system (west view) ........................................................................................................ 35 Figure 7.2.1: Schematic long-section through Wallaby ................................................................................................................... 41 Figure 8.1.1: Sample preparation and analytical flow sheet for ALS Laboratory ............................................................................ 47 Figure 8.1.2: Sample preparation and analytical flow sheet for Granny Smith Laboratory ............................................................. 48 Figure 10.2.1: Granny Smith plant monthly feed grades and recoveries compared to the recovery estimation model used for Z60 to Z120 ............................................................................................................................................................... 63 Figure 12.2.1: Wallaby mining areas (west view) ............................................................................................................................ 82 Figure 13.2.1: End of Mineral reserve outline ................................................................................................................................. 93 Figure 14.1.1: Schematic flow diagram of Granny Smith process plant .......................................................................................... 95 Figure 15.1.1: TSF overview ......................................................................................................................................................... 100 Figure 15.1.2: Cell 1 buttress ......................................................................................................................................................... 102 Figure 15.7.1: Plan of Wallaby and Granny Smith infrastructure .................................................................................................. 104 P a g e 8 | 136 1 Executive Summary This technical report summary was prepared for Gold Fields Limited (Gold Fields or the Company or the Registrant), a production stage issuer. The purpose of this technical report summary is to support the disclosure of exploration results, Mineral resources and Mineral reserves for the Granny Smith Gold Mine (Granny Smith), a production stage property located in Western Australia, in accordance with the Securities and Exchange Commission (SEC) property disclosure requirements for mining Registrants as specified in Subpart 229.1300 of Regulation S-K - Disclosure by Registrants Engaged in Mining Operations. The effective date of this technical report summary is 31 December 2021. Unless otherwise specified, all units of currency are in United States dollars ($). All measurements are metric with the exception of troy ounces (oz). 1.1 Property description and ownership Granny Smith is located approximately 740 kilometres (km) northeast of Perth, the capital of Western Australia (Figure 1.2.1). Gold Fields through its wholly owned subsidiary GSM Mining Company Pty Ltd (GSM) controls mineral tenements covering a total area of 81,827 ha and a further 10,570 ha of miscellaneous and non-managed tenements. The major components of the Granny Smith mining and processing operation are: The Wallaby underground mine. A 3.5 Mt/a carbon-in-pulp (CIP) processing facility. A tailings storage facility (TSF). A hybrid power station. Administration centers Granny Smith aerodrome An accommodation village. Ore mined from Wallaby is trucked 13 km to the processing plant to the northeast at Granny Smith. 1.2 Geology and mineralisation Granny Smith is in the Kurnalpi Terrane of the Archean Yilgarn Craton. At a regional scale, the host greenstone belt is dominated by the Mt Margaret Dome in the northwest and the Kirgella Dome in the southeast. The zone between the two domes hosts a series of north to north-northeast striking sigmoidal shear zones of the Laverton Tectonic Zone. The stratigraphy of the Laverton region is defined broadly by a mafic–ultramafic succession overlain by an intermediate volcanic succession, which in turn is overlain by siliciclastic basin successions (e.g. Granny Smith Basin and the Wallaby Conglomerate) and intruded by temporally and chemically distinct suites of felsic to mafic intrusive rocks.
P a g e 9 | 136 Figure 1.2.1: Location of Granny Smith Source: Granny Smith CPR, 2021 The Granny Smith gold deposits (including Windich, Granny and Goanna) occur along a north-trending structural corridor. The eastern contact zone of a granitoid intrusion within metasedimentary rocks is the locus of the Granny Smith corridor mineralisation. The gold mineralisation is closely associated with a north-south striking reverse (thrust) fault zone that dips shallowly to the east and partly follows the contact between the granitoid and sedimentary rocks. Two stages of alteration are associated with the gold mineralisation: an earlier widespread and pervasive hematite and sericite-carbonate alteration overprinting sericite-carbonate alteration hosting ankerite-pyrite-quartz breccia veins which represent the main mineralising stage. The Wallaby gold deposit is hosted within a thick mafic conglomerate unit that dips moderately to the southeast and is intruded by a suite of fractionated alkaline dykes. A 600 m × 800 m wide zone of actinolite-magnetite- calcite±epidote±pyrite alteration affects the intrusives and conglomerates and forms a relatively uniform and brittle pipe-shaped body dipping approximately 50 º to the south. In general, the gold lodes form a series of stacked zones. Four dominant gold-related domains are identified: P a g e 10 | 136 Fracture mesh gold lodes developed at intersections of brittle structures (faults and veins). Horsetail domain gold lodes where the lode fault has diverged into multiple faults with extensive extension veins formed between the multiple faults. Ductile shear-controlled gold lodes resulting from the intersection between brittle structures and earlier ductile shears and cleavages associated with north oriented shearing. Early-stage hematite associated gold lodes. Gold within the Wallaby deposit occurs along micro-fractures within pyrite or as grains within quartz veining. Coarse visible gold is also observed in narrow, moderate to steeply dipping quartz-carbonate veins. Gold mineralisation at Hillside is associated with two separate stages of quartz veining, hosted by carbonate-muscovite- quartz-pyrite-(magnetite-biotite) altered basalt exhibiting a pervasive shear fabric. Pyrite and arsenopyrite are the two major sulphide phases present, with gold appearing to be associated intimately with arsenopyrite. P a g e 11 | 136 1.3 Exploration, development and operations Granny Smith is an underground gold mining operation with all currently ore sourced from Zones 250/60, 70, 80, 90, 100, 110 and 120 at the Wallaby mine. Access to the Wallaby underground mine is via a portal established within the former Wallaby open pit. The mine operation is trackless, with truck haulage from underground via a decline and ramp to the surface. The main underground mining methods are inclined room and pillar and longhole stoping. The Wallaby underground mining equipment is predominantly an owner-operated fleet, with maintenance activities undertaken in-house. Some development, cable bolting and charging activities are completed by contractors. A contractor fleet of 190t capacity road trains transports the stockpiled surface ore to the Granny Smith process plant. The recent production performance of Granny Smith is summarised in Table 12.2.1. A feasibility study on Zone 135 at ~1,450 m below surface in parallel with initial development was completed and approved during 2021. Exploration activities at Granny Smith during 2021 were focused on extensions to the Wallaby deposit and across the broader tenement package with the aim of discovering new gold deposits. During 2021, bedrock testing of high-potential surface exploration targets below aircore (AC) anomalies were completed at Brumby Well and Thorny Devil. A magnetic anomaly was tested with one Diamond core (DD) hole at Morepork. Significant surface DD programs were conducted close to existing mining infrastructure at Wallaby Periphery as well as the Granny Smith Complex (GSC). Reverse Circulation (RC) drilling was utilised for one program at the GSC to test for the potential of shallow extensions. In-mine exploration and resource drilling at Wallaby focused on infill and extensions of Zone 135 and Zone 150. Infill of Zone 135 confirmed continuity of the main lode with all holes returning mineralised intercepts. Drilling identified an extension of the Zone 135 Vertical East lodes to the east and confirmed mineralisation of the Zone 135 Vertical West lodes. Zone 150 extensional drilling identified mineralisation at expected depths which returned assays of economic tenor. The 2022 exploration program will continue to focus on resource and reserve growth at Wallaby through extensions both laterally and at depth with further drilling of the Zone 135 Horizontal and Vertical lodes to close-out open areas and define the full orebody footprint. 100 x 100 m conversion drilling in Zone 150 will continue to test geological and grade continuity in the southern half of the orebody while 50 x 50 m infill drilling will commence in the northern half. The aim is to complete 50 x 50 m drilling on >70 % of the Zone 150 Main lode for a PFS in Q1 2023. Follow-up bedrock testing of high-priority surface exploration targets will continue. The in-mine exploration program will be supported and extended by a surface drilling program around the Wallaby deposit. At Granny Smith, drilling will evaluate further east-dip shear repeats in the footwall. P a g e 12 | 136 1.4 Mineral resource estimates The Granny Smith Mineral resources exclusive of Mineral reserves as of 31 December 2021 are summarised in Table 1.4.1. The Mineral resources are 100 % attributable to Gold Fields and are net of production depletion up to 31 December 2021. The point of reference for the Mineral resources is in-situ with dilution applied. Table 1.4.1: Granny Smith - summary of gold Mineral resources as at 31 December 2021 (fiscal year end) based on a gold price of $1,500/oz Mineral resources (exclusive of Mineral reserves) Cutoff Grades (g/t Au) Metallurgical Recovery (%) Amount/ (kt) Grades/ (g/t Au) Amount/ (koz Au) Underground Mineral resources UG measured Mineral resources 4,050 5.3 693 2.30 - 2.90 92 % UG indicated Mineral resources 20,743 5.0 3,367 1.89 - 3.08 92 % UG measured + indicated Mineral resources 24,792 5.1 4,059 1.89 - 3.08 92 % UG inferred Mineral resources 10,663 5.1 1,735 1.89 - 3.08 92 % Open Pit Mineral resources OP measured Mineral resources - - - - OP indicated Mineral resources - - - - OP measured + indicated Mineral resources - - - - OP inferred Mineral resources 357 1.9 22 0.66 92 % Stockpile Mineral resources SP measured Minerals resources - - - - SP indicated Mineral resources - - - - SP measured + indicated Mineral resources - - - - SP inferred Mineral resources - - - - Total Granny Smith Mineral resources Total measured Mineral resources 4,050 5.3 693 2.30 - 2.90 92 % Total indicated Mineral resources 20,743 5.0 3,367 1.89 - 3.08 92 % Total measured + indicated Mineral resources 24,792 5.1 4,059 1.89 - 3.08 92 % Total inferred Mineral resources 11,020 5.0 1,757 0.66 - 3.08 92 % Note: a) Rounding of figures may result in minor computational discrepancies. b) Mineral resources are exclusive of Mineral reserves. c) Mineral Resources categories are assigned with consideration given to geological complexity, grade variance, drillhole intersection spacing and proximity of mining development. d) Quoted as diluted in situ metric tonnes and grades. Metallurgical recovery factors have not been applied to the Mineral resource estimates. The approximate metallurgical recovery factor is 92 %. The metallurgical recovery is the ratio, expressed as a percentage, of the mass of the specific mineral product recovered from ore treated at the process plant to its total specific mineral content before treatment. Granny Smith mining operations vary according to the mix of the source material. e) The metal prices used for the 2021 Mineral resources are based on a gold price of $1,500 per ounce or A$2,000 per ounce (at an exchange rate of A$1: $0.75). Open pit Mineral resources at the Australian operations are based on revenue factor 1 pits and the underground Mineral resources on appropriate mine design and extraction schedules. The gold price used for Mineral resources approximates 15 % higher than the selected Mineral reserve. f) The cutoff grade may vary per shaft, open pit or underground mine, depending on the respective costs, depletion schedule, ore type, expected mining dilution and expected mining recovery. The average or range of cutoff grade values applied to the Mineral resources are; Granny Smith 2.11 g/t to 3.08 g/t Au mill feed (underground) and 0.66 g/t Au (open pit). g) The Mineral resources are based on initial assessments at the resource gold price of $1,500/oz and consider estimates of all Granny Smith costs, the impact of modifying factors such as mining dilution and mining recovery, processing recovery and royalties. Mineral resources are also tested through the application of Environmental, Social and Governance (ESG) criteria to demonstrate reasonable prospects for economic extraction. h) The Mineral resources are estimated at a point in time and can be affected by changes in the gold price, US Dollar currency exchange rates, permitting, legislation, costs and operating parameters. Source: Granny Smith CPR, 2021 The Mineral resources are based on initial assessments at the resource gold price of $1,500/oz and consider estimates of all Granny Smith costs, the impact of modifying factors such as mining dilution and recovery, processing recovery and royalties to demonstrate reasonable prospects for economic extraction.
P a g e 13 | 136 1.5 Mineral reserve estimates The Granny Smith Mineral reserves as of 31 December 2021 are summarised in Table 1.5.1. The Mineral reserves are 100 % attributable to Gold Fields and are net of production depletion up to 31 December 2021. The point of reference for the Mineral reserves is ore delivered to the processing facility. Table 1.5.1: Granny Smith - summary of gold Mineral reserves at 31 December 2021 (fiscal year end) based on a gold price of $1,300/oz Amount/ (kt) Grades/ (g/t Au) Amount/ (koz Au) Cutoff Grades (g/t Au) Metallurgical Recovery (%) Underground Mineral reserves UG proven Mineral reserves 2,212 4.9 351 3.21 92 % UG probable Mineral reserves 10,363 5.6 1,861 3.21 92 % UG total Mineral reserves 12,575 5.5 2,211 3.21 92 % Stockpile Mineral reserves SP proven Mineral reserves 26 5.6 5 1.03 83 % SP probable Mineral reserves - - - 1.03 83 % SP total Mineral reserves 26 5.6 5 1.03 83 % Total Mineral reserves Total proven Mineral reserves 2,239 4.9 355 Total probable Mineral reserves 10,363 5.6 1,861 Total Granny Smith Mineral reserves 2021 12,601 5.5 2,216 Total Granny Smith Mineral reserves 2020 12,613 5.3 2,167 Year on year difference (%) -0.1% 2% 2% Note: a) Rounding of figures may result in minor computational discrepancies. b) Refer to Table 12.5.1 for year-on-year Mineral reserve comparison. c) Quoted as mill delivered metric tonnes and run-of-mine (RoM) grades, inclusive of all mining dilutions and gold losses except mill recovery. Metallurgical recovery factors have not been applied to the reserve figures. The approximate metallurgical recovery factor is 92 % for underground feed. The metallurgical recovery is the ratio, expressed as a percentage, of the mass of the specific mineral product recovered from ore treated at the process plant to its total specific mineral content before treatment. The recoveries for Granny Smith vary according to the mix of the source material (e.g. oxide, transitional fresh and ore type blend) and method of treatment. d) The metal prices used for the 2021 LoM Mineral reserves are based on a gold price of $1,300 per ounce or A$1,750 per ounce (at an exchange rate of A$1:$0.74). Open pit Mineral reserves at Granny Smith are based on optimised pits and the underground operations on appropriate mine design and extraction schedules. The gold price used for Mineral reserves is detailed in particularity in Chapter 16 Marketing. e) Dilution relates to planned and unplanned waste and/or low-grade material being mined and delivered to the process plant. Ranges are given for those operations that have multiple orebody styles and mining methodologies. The mine dilution factors is 11 % to 20 % (underground). f) The mining recovery factor relates to the proportion or percentage of ore mined from the defined orebody at the gold price used for the declaration of Mineral reserves. This percentage will vary from mining area to mining area and reflects planned and scheduled reserves against actual tonnes, grade and metal mined, with all modifying factors, mining constraints and pillar discounts applied. The mining recovery factors are 90 % to 92 % (underground). g) The cutoff grade may vary per zone, open pit or underground mine, depending on the respective costs, depletion schedule, ore type, expected mining dilution and expected mining recovery. The average or range of cutoff grade values applied in the planning process are: Wallaby Underground 2.63 g/t to 3.48 g/t Au mill feed. h) A gold based Mine Call Factor (gold called for over gold accounted for) determined primarily on historic performance but also on realistic planned improvements where appropriate, is applied to the Mineral reserves. A Mine Call Factor of 100 % has been applied at Granny Smith. i) The Mineral reserves are estimated at a point in time and can be affected by changes in the gold price, US Dollar currency exchange rates, permitting, legislation, costs and operating parameters. j) Granny Smith is 100 % attributable to Gold Fields and is entitled to mine all declared material located within the properties mineral leases and all necessary statutory mining authorisations and permits are in place or have reasonable expectation of being granted. Source: Granny Smith CPR, 2021 The Granny Smith Mineral reserves are the economically mineable part of the measured and indicated Mineral resources based on LoM schedules and pre-feasibility studies completed at the reserve gold price of $1,300/oz to justify their economic viability at 31 December 2021. A pre-feasibility study has an estimated accuracy of ± 25 % with a contingency of no more than 15 %. P a g e 14 | 136 1.6 Capital and operating cost estimates Capital costs for the Mineral reserve are based on continued operation and includes underground mine development, ventilation, dewatering, power, escapeways, exploration, TSF construction and expansions. The forecast capital costs are summarised in Table 1.6.1. Table 1.6.1: Capital costs ($ million) Units 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 Capital $ million 95.4 74.9 51.9 24.8 25.4 25.7 20.5 18.7 23.3 4.0 3.3 Notes: a) The detailed capital cost schedule is presented in Table 18.1.1. b) This capital summary estimate is for the Mineral reserve life-of-mine schedule. c) Closure costs are included in operating costs. Source: Granny Smith CPR, 2021 Budgeted operating costs for the 31 December 2021 Mineral reserve LoM plan are summarised in Table 1.6.2. Table 1.6.2: Operating costs ($ million) Units 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 Operating Cost $ million 195.2 203.3 194.6 161.1 166.9 137.5 147.5 152.2 122.6 96.3 88.7 Notes: a) The detailed operating cost schedule is presented in Table 18.2.1. b) This capital summary estimate is for the Mineral reserve life-of-mine schedule. Source: Granny Smith CPR, 2021 The operating costs covers mining, cartage, processing, onsite and offsite administration. The total excludes rehabilitation and closure costs of $65.5 million with 56.1 million being spent after 2033. The 2021 Reserve LoM mining costs are based on the 2022 budget unit costs. In cases where there is an expected change in operating practice (mining at increased depth) in the mine that will have a material effect on costs these expected changes have been incorporated into the cost estimates. 1.7 Permitting The key operating environmental permits for the operation are issued by DMIRS and DWER and relate to: Mining Proposal which includes Land Clearing, Disturbance and Infrastructure. Environmental Licence. Native Vegetation Clearing. Mine dewatering (category 06). Water abstraction and groundwater operating strategies. Sewerage facility (category 54). Putrescible landfill site. Mine Closure Plan. Gold Fields maintains a tenement management auditing system that flags lease renewals to meet the renewal process timeline and to keep the tenement ownership in good standing by meeting expenditure and other conditions. Granny Smith has security of tenure for all current exploration and mining tenements that contribute to Mineral resources and reserves. Granny Smith operates in compliance with relevant environmental legislation and remains compliant regarding key environmental risks, namely: tailings storage facilities, processing of ore, land disturbance, chemical blending and storage, electric power generation, sewage and landfill operations and mine dewatering. All other permitting and licensing requirements to start any future mining operation, including but not limited to, issues of P a g e 15 | 136 Aboriginal cultural heritage, local disturbance, clearing, environmental, power and water extraction/disposal permitting, follow well established authorisation protocols with the relevant state authorities. In 2019, a claim under the Native Title Act 1993 (Cth) by the Nyalpa Pirniku People (WAD91/2019) was registered. This claim covers the entire Granny Smith mining operations. Granny Smith is currently engaged in early discussions with the Nyalpa Pirniku People under the ‘right to negotiate’ process with respect to certain ancillary tenure. This claim is still under determination as at December 2021. In May 2021 a Heritage Agreement was signed between Granny Smith and Nyalpa Pirniku. Granny Smith consults with relevant Aboriginal stakeholder groups (including the Nyalpa Pirniku) to ensure that areas of Aboriginal cultural heritage are identified and recorded. Granny Smith also actively contributes to initiatives that assist the host community. The overall closure liability for Granny Smith is currently estimated at $65.5 million. 1.8 Conclusions and recommendations The Granny Smith Mineral reserves currently support a eleven-year LoM plan that values the operation at $204.3 million at the reserve gold price of $1,300/oz. Granny Smith continues to discover and replace Mineral reserves that contribute to growing the LoM profile. Continued investment in exploration and infrastructure is justified by the positive economic analysis. Ongoing exploration and geological interpretation suggest that the Granny Smith property has the potential to extend and replace existing Mineral resources and reserves. It is recommended that further exploration is carried out at the following areas which have a good probability of extending mine life: Wallaby Zone 135 Wallaby Zone 150 Granny Smith Complex Gold Fields’ commitment to materiality, transparency and competency in its Mineral Resources and Mineral Reserves disclosure to regulators and in the public domain is of paramount importance to the Qualified person and the Registrants Executive Committee and Board of Directors continue to endorse the company’s internal and external review and audit assurance protocols. This Technical Report Summary should be read in totality to gain a full understanding of Granny Smith’s Mineral Resource and Mineral Reserve estimation and reporting process, including data integrity, estimation methodologies, modifying factors, mining and processing capacity and capability, confidence in the estimates, economic analysis, risk and uncertainty and overall projected property value. However, to ensure consolidated coverage of the company’s primary internal controls in generating Mineral resource and reserve estimates a key point summary is provided in Chapter 21 for reference. P a g e 16 | 136 2 Introduction 2.1 Registrant for whom the technical report summary was prepared The Granny Smith technical report summary was prepared for Gold Fields Limited (Gold Fields or the Company or the Registrant), a production stage issuer. 2.2 Terms of reference and purpose of the technical report summary The purpose of this technical report summary is to support the disclosure of exploration results, Mineral resources and Mineral reserves for the Granny Smith Gold Mine (Granny Smith or the Property), a production stage property located in Western Australia, in accordance with the Securities and Exchange Commission (SEC) property disclosure requirements for mining Registrants as specified in Subpart 229.1300 of Regulation S-K - Disclosure by Registrants Engaged in Mining Operations. The effective date of this technical report summary is 31 December 2021. The Mineral resources and Mineral reserves disclosed in this technical report summary were reported in accordance with the South African Code for the Reporting of Exploration Results, Mineral resources and Mineral reserves (SAMREC Code 2016). SAMREC is based on the Committee for Mineral reserves International Reporting Standards (CRIRSCO) Reporting Template 2013. 2.3 Sources of information This technical report summary is principally based on information disclosed in the “Competent Person’s Report on the Material Assets of Granny Smith Gold Mine as at 31 December 2021” prepared by Granny Smith Qualified person on behalf of the Company. The Competent Person’s Report (CPR) was supplemented by technical reports and studies prepared by the Company and third-party specialists engaged by the Company as cited throughout this technical report summary and listed in Section 24. All units of currency are in United States dollars ($). All measurements are metric with the exception of troy ounces (oz).
P a g e 17 | 136 2.4 Qualified persons and details of inspection The Qualified persons responsible for the preparation of this technical report summary are listed in Table 2.4.1. All the Qualified persons are eligible members in good standing of a recognised professional organisation (RPO) within the mining industry and have at least five years of relevant experience in the type of mineralisation and type of deposit under consideration and in the specific type of activity that the Qualified person is undertaking on behalf of the Company at the time this technical report summary was prepared. The Qualified persons were appointed by Gold Fields. The RPO affiliation in good standing was also reviewed by Gold Fields. Table 2.4.1: List of Qualified persons Incumbent Employer Position Affiliation in good standing Relevant experience (years) Details of inspection Responsibility for which chapters Dr Julian Verbeek Gold Fields VP Geology and Mineral Resources FAusIMM - 207994 35 Has not attended site This document has been prepared under the supervision of and reviewed by Julian Verbeek. Chapters 1-26 Richard Butcher Gold Fields Chief Technical Officer GFL Group Technical Services FAusIMM CP - 211182 41 Has attended site Overview and review of document. Chapters 1-5, 12-13 & 15-26 Dr Winfred Assibey- Bonsu Gold Fields Group Geostatistician and Evaluator FSAIMM - 400112/00 35 Has attended site Review of Resources and Reserves. Chapters 8 - 9 & 11 Andrew Engelbrecht Gold Fields Group Geologist AusIMM - 224997 22 Has not attended site Geology and Resources. Chapters 6 - 9 & 11 Peter Andrews Gold Fields VP: Geotechnical FAusIMM CP - 302255 25 Has attended site Geotechnical review. Sections 7.4, 15.2, 17.3.2 Daniel Hillier Gold Fields VP: Metallurgy FAusIMM CP - 227106 31 Has attended site Chapters 10 & 14 Johan Boshoff Gold Fields Group Head of Tailings FAusIMM - 1007564 26 Has attended site Tailings Review. Sections 15.1 & 17.3.1 Andre Badenhorst Gold Fields Group Technical and Reporting Governance Manager MAusIMM - 309882 41 Has attended site Chapters 1-26 Fiona Phillips Gold Fields VP: Technical AusIMM - 112538 24 Twice a year. Overview and review of document. Chapters 1-5, 10 & 12-26 Trent Strickland Gold Fields Principal Geologist: Resources & Reserves AusIMM - 211953 AIG - 6761, 17 Twice a year. Geology and Resources. Chapters 1 - 11 Don Grimbeek Gold Fields Manager: Geology AusIMM - 325556; SACNASP - 400086/9 35 Site employee Chapters 1-26 Richard Tully Gold Fields Superintendent: Resource Geology AusIMM – 992513 AIG - 2716, 19 Quarterly visits. Resources Estimation Chapters 8 - 9 & 11 Neil Morris Gold Fields Superintendent: Mine Planning AusIMM - 208320 18 Quarterly visits. Reserves and Mining Chapters 1-5, 10 & 12-26 Note: c) The Qualified persons where not all able to attend site in 2021 for Mineral reserve and Mineral resource reviews, however, the Mineral reserve and Mineral resource were reviewed according to the Chapter 21 description. Some qualified persons have visited the site previous to 2021. 2.5 Report version update This is the maiden technical report summary filed by Gold Fields on the Granny Smith property in Western Australia. P a g e 18 | 136 3 Property description 3.1 Property location Granny Smith is located 740 km northeast of Perth, the capital of Western Australia at latitude 28°51’09” S and longitude 122°18’35” E (Figure 1.2.1). The nearest population centre is the town of Laverton, 23 km to the north with a population of 871 as at 2016 (Figure 3.3.1). The closet major population centre is the city of Kalgoorlie-Boulder (population of ~29,000) 230 km to the south-southwest. 3.2 Ownership and area The Company via its wholly owned subsidiary GSM Mining Company Pty Ltd (GSM) (Australian Company Number 165 235 030) controls prospecting, exploration, mining, miscellaneous and non-managed tenements covering a total area of 92,397 ha. The tenements are grouped into four major areas: Wallaby, Central Laverton, Barnicoat and Prendergast. The mineral tenements cover an area of approximately 81,827 ha and a further 10,570 hectares of miscellaneous and non-managed tenements. Granny Smith has 100 % interest in all mineral rights on these leases, including 10,278 ha of miscellaneous licences for mine infrastructure such as pipelines and power lines. Granny Smith also has an interest in a further 2 tenements under the Merolia Joint Venture covering 291 ha. Granny Smith does not manage the joint venture tenements. 3.3 Property mineral titles, claims, mineral rights, leases and options The Company via its wholly owned subsidiary Granny Smith has 100 % ownership of 35 granted Mining Leases, 27 granted Exploration Licenses, 22 granted Miscellaneous Licenses and 13 granted Prospecting Licences covering an area of 92,105 ha. A summary of the tenements is shown in Table 3.3.1 and illustrated in Figure 3.3.2. P a g e 19 | 136 Figure 3.3.1: Granny Smith operating sites and infrastructure Source: Granny Smith CPR, 2021 P a g e 20 | 136 Figure 3.3.2: Granny Smith mineral titles Source: Granny Smith CPR, 2021 All tenements are registered the name of Granny Smith which has security of tenure for all current exploration and mining leases that contribute to the Mineral resources and reserves described in this report. Granny Smith does not have freehold ownership of the mining areas.
P a g e 21 | 136 Table 3.3.1: List of Granny Smith tenements Number Grant date Expiry date Area (BL= blocks) (HA = hectares) Min. annual expenditure ($) Annual rent ($) Reporting group Term granted Exploration Licences E38/1935 29-May-08 28-May-22 17 BL $51,852 $8,525 Wallaby - C168/2001 5 Years (Extended) E38/2221 23-Mar-10 22-Mar-22 3 BL $37,037 $1,504 Central Laverton - C086/2002 5 Years (Extended) E38/2886 17-Jun-15 16-Jun-25 3 BL $22,222 $1,504 Central Laverton - C086/2002 5 Years (Extended) E38/2887 15-Apr-14 14-Apr-24 10 BL $51,852 $5,015 Central Laverton - C086/2002 5 Years (Extended) E38/2888 23-Jan-15 22-Jan-25 10 BL $37,037 Central Laverton - C086/2002 5 Years (Extended) E38/2924 16-Oct-15 15-Oct-25 7 BL $37,037 $3,510 Central Laverton - C086/2002 5 Years (Extended) E38/2925 23-Sep-14 22-Sep-24 2 BL $37,037 $1,003 Central Laverton - C086/2002 5 Years (Extended) E38/3005 09-Jul-15 08-Jul-25 3 BL $22,222 $1,504 Central Laverton - C086/2002 5 Years (Extended) E38/3025 17-Jun-15 16-Jun-25 11 BL $37,037 $5,516 Wallaby - C168/2001 5 Years (Extended) E38/3052 26-Apr-17 25-Apr-22 39 BL $43,333 $10,342 Central Laverton - C086/2002 5 Years E38/3095 28-Mar-17 27-Mar-22 13 BL $22,222 $3,447 Prendergast Shear - C160/2017 5 Years E38/3149 09-Feb-18 08-Feb-23 1 BL $7,407 $301 Prendergast Shear - C160/2017 5 Years E38/3162 03-Jul-17 02-Jul-22 5 BL $14,815 $1,326 Central Laverton - C086/2002 5 Years E38/3171 13-Sep-17 12-Sep-22 1 BL $7,407 $301 Central Laverton - C086/2002 5 Years E38/3172 16-Mar-17 15-Mar-22 1 BL $7,407 $301 Central Laverton - C086/2002 5 Years E38/3180 20-Mar-17 19-Mar-22 1 BL $7,407 $301 Central Laverton - C086/2002 5 Years E38/3181 20-Mar-17 19-Mar-22 1 BL $7,407 $265 Central Laverton - C086/2002 5 Years E38/3182 20-Mar-17 19-Mar-22 3 BL $14,815 $796 Central Laverton - C086/2002 5 Years E38/3204 10-Jul-17 09-Jul-22 14 BL $22,222 $3,713 Prendergast Shear - C160/2017 5 Years E38/3214 10-Oct-17 09-Oct-22 8 BL $22,222 $2,121 Prendergast Shear - C160/2017 5 Years E38/3215 10-Oct-17 09-Oct-22 4 BL $14,815 $1,061 Prendergast Shear - C160/2017 5 Years E38/3216 31-Jul-17 30-Jul-22 1 BL $7,407 $301 Central Laverton - C086/2002 5 Years E38/3239 01-Dec-17 30-Nov-22 7 BL $22,222 $1,856 Prendergast Shear - C160/2017 5 Years E38/3241 09-Feb-18 08-Feb-23 1 BL $7,407 $301 Prendergast Shear - C160/2017 5 Years E38/3242 09-Feb-18 08-Feb-23 1 BL $7,407 $301 Prendergast Shear - C160/2017 5 Years E38/3406 13-Feb-20 12-Feb-25 5 BL $11,111 $541 Prendergast Shear - C160/2017 5 Years E39/1260 29-May-08 28-May-22 29 BL $64,444 $14,543 Wallaby - C168/2001 5 Years (Extended) Miscellaneous Licences L38/106 26-Sep-06 25-Sep-27 200.00000 HA $2,919 21 Years L38/144 12-Aug-09 11-Aug-30 150.00000 HA $2,189 21 Years L38/148 23-Mar-09 22-Mar-30 1.00000 HA $15 21 Years L38/149 12-Aug-09 11-Aug-30 4.00000 HA $58 21 Years L38/223 17-Jun-13 16-Jun-34 6,058.00000 HA $2,692 21 Years L38/292 27-Sep-18 26-Sep-39 2,961.53070 HA $1,316 21 Years L38/326 24-Jan-19 23-Jan-40 14.50000 HA $0 21 Years L38/329 20-Sep-21 19-Sep-42 240.29052 HA $3,517 21 Years L38/330 01-Jul-21 30-Jun-42 154.47690 HA $2,262 21 Years L38/48 14-Oct-92 13-Oct-22 18.00000 HA $263 5 Years (Renewed) L38/50 11-Aug-93 10-Aug-23 74.30000 HA $1,094 5 Years (Renewed) L38/51 11-Aug-93 10-Aug-23 18.80000 HA $277 5 Years (Renewed) L38/58 18-Jan-95 17-Jan-25 28.00000 HA $0 5 Years (Renewed) L38/62 17-Feb-95 16-Feb-25 176.40000 HA $2,583 5 Years (Renewed) L38/69 17-Sep-98 16-Sep-23 22.90000 HA $336 5 Years (Renewed) L38/77 23-Jun-00 22-Jun-42 11.60000 HA $175 21 Years (Renewed) L38/80 07-Aug-00 06-Aug-42 21.10000 HA $321 21 Years (Renewed) L38/88 21-Nov-00 20-Nov-42 27.70000 HA $409 21 Years (Renewed) L38/95 12-Jul-02 11-Jul-23 3.23209 HA $58 21 Years L38/99 18-Dec-03 17-Dec-24 40.12065 HA $598 21 Years L39/109 15-Oct-99 14-Oct-41 14.70000 HA $219 21 Years (Renewed) L39/31 12-Apr-89 11-Apr-24 60.07000 HA $890 5 Years (Renewed) Mining Leases P a g e 22 | 136 Number Grant date Expiry date Area (BL= blocks) (HA = hectares) Min. annual expenditure ($) Annual rent ($) Reporting group Term granted M38/1131 11-Aug-08 10-Aug-29 486.65000 HA $36,074 $7,936 Central Laverton - C086/2002 21 Years M38/1136 03-Nov-09 02-Nov-30 422.75000 HA $31,333 $6,893 Wallaby - C168/2001 21 Years M38/1137 03-Nov-09 02-Nov-30 781.90000 HA $57,926 $12,744 Wallaby - C168/2001 21 Years M38/1144 28-Apr-09 27-Apr-30 581.35000 HA $43,111 $9,484 Central Laverton - C086/2002 21 Years M38/1145 28-Apr-09 27-Apr-30 806.75000 HA $59,778 $13,151 Central Laverton - C086/2002 21 Years M38/1146 23-Jun-09 22-Jun-30 800.00000 HA $59,259 $13,037 Central Laverton - C086/2002 21 Years M38/1280 29-Nov-18 28-Nov-39 10,245.00000 HA $758,889 $166,956 Wallaby - C168/2001 21 Years M38/161 24-May-88 23-May-30 787.65000 HA $58,370 $12,841 Central Laverton - C086/2002 21 Years (Renewed) M38/162 24-May-88 23-May-30 576.85000 HA $42,741 $9,403 Central Laverton - C086/2002 21 Years (Renewed) M38/167 30-Aug-88 29-Aug-30 19.44000 HA $7,407 $326 Central Laverton - C086/2002 21 Years (Renewed) M38/18 16-Oct-84 15-Oct-26 8.73400 HA $7,407 $147 Central Laverton - C086/2002 21 Years (Renewed) M38/191 13-Oct-88 12-Oct-30 993.25000 HA $73,630 $16,199 Central Laverton - C086/2002 21 Years (Renewed) M38/205 03-Mar-89 02-Mar-31 553.30000 HA $41,037 $9,028 Central Laverton - C086/2002 21 Years (Renewed) M38/253 04-Dec-89 03-Dec-31 60.88000 HA $7,407 $994 Central Laverton - C086/2002 21 Years (Renewed) M38/287 11-Sep-90 10-Sep-32 316.85000 HA $23,481 $5,166 Central Laverton - C086/2002 21 Years (Renewed) M38/288 11-Sep-90 10-Sep-32 870.85000 HA $64,519 $14,194 Central Laverton - C086/2002 21 Years (Renewed) M38/361 07-Sep-93 06-Sep-35 994.00000 HA $73,630 $16,199 Central Laverton - C086/2002 21 Years (Renewed) M38/362 07-Sep-93 06-Sep-35 999.10000 HA $74,074 $16,296 Central Laverton - C086/2002 21 Years (Renewed) M38/380 04-Feb-94 03-Feb-36 9.71900 HA $7,407 $163 Central Laverton - C086/2002 21 Years (Renewed) M38/389 25-Oct-94 24-Oct-36 558.50000 HA $41,407 $9,110 Central Laverton - C086/2002 21 Years (Renewed) M38/397 20-Oct-98 19-Oct-40 975.85000 HA $72,296 $15,905 Central Laverton - C086/2002 21 Years (Renewed) M38/440 20-Oct-98 19-Oct-40 315.15000 HA $23,407 $5,150 Central Laverton - C086/2002 21 Years (Renewed) M38/483 25-Nov-98 24-Nov-40 552.80000 HA $40,963 $9,012 Central Laverton - C086/2002 21 Years (Renewed) M38/525 20-Oct-98 19-Oct-40 240.35000 HA $17,852 $3,927 Central Laverton - C086/2002 21 Years (Renewed) M38/532 10-Jan-08 09-Jan-29 786.30000 HA $58,296 $12,825 Central Laverton - C086/2002 21 Years M38/533 10-Jan-08 09-Jan-29 878.30000 HA $65,111 $14,324 Central Laverton - C086/2002 21 Years M38/560 18-Nov-08 17-Nov-29 928.70000 HA $68,815 $15,139 Wallaby - C168/2001 21 Years M38/593 18-Jan-08 17-Jan-29 455.90000 HA $33,778 $0 Wallaby - C168/2001 21 Years M38/690 02-Mar-00 01-Mar-42 901.10000 HA $66,815 $14,699 Wallaby - C168/2001 21 Years (Renewed) M38/691 02-Mar-00 01-Mar-42 300.50000 HA $22,296 $4,905 Wallaby - C168/2001 21 Years (Renewed) M38/692 02-Mar-00 01-Mar-42 901.60000 HA $66,815 $14,699 Wallaby - C168/2001 21 Years (Renewed) M38/725 13-Jan-03 12-Jan-24 985.15000 HA $73,037 $16,068 Wallaby - C168/2001 21 Years M38/726 18-Jan-08 17-Jan-29 981.05000 HA $72,741 $0 Wallaby - C168/2001 21 Years M38/744 18-Jan-08 17-Jan-29 220.20000 HA $16,370 $0 Wallaby - C168/2001 21 Years M38/849 10-Feb-09 09-Feb-30 894.90000 HA $66,296 $14,585 Wallaby - C168/2001 21 Years Prospecting Licences P38/4181 29-Mar-17 28-Mar-25 44.97000 HA $1,481 $110 Central Laverton - C086/2002 4 Years (Extended) P38/4182 04-Apr-16 03-Apr-24 196.00000 HA $5,807 $479 Central Laverton - C086/2002 4 Years (Extended) P38/4183 04-Apr-16 03-Apr-24 189.76000 HA $5,630 $464 Central Laverton - C086/2002 4 Years (Extended) P38/4190 02-Jun-16 01-Jun-24 132.20000 HA $3,941 $325 Central Laverton - C086/2002 4 Years (Extended) P38/4208 16-Apr-18 15-Apr-22 193.75000 HA $5,748 $474 Prendergast Shear - C160/2017 4 Years P38/4342 07-Dec-17 06-Dec-21 166.00000 HA $4,919 $406 Prendergast Shear - C160/2017 4 Years P38/4343 07-Jul-17 06-Jul-25 138.45250 HA $4,119 $340 Prendergast Shear - C160/2017 4 Years (Extended) P38/4344 07-Jul-17 06-Jul-25 27.89730 HA $1,481 $68 Prendergast Shear - C160/2017 4 Years (Extended) P38/4345 07-Jul-17 06-Jul-25 25.98410 HA $1,481 $64 Prendergast Shear - C160/2017 4 Years (Extended) P38/4407 14-Nov-17 13-Nov-21 40.43960 HA $1,481 $100 Wallaby - C168/2001 4 Years P38/4423 08-Feb-18 07-Feb-22 184.70150 HA $5,481 $452 Prendergast Shear - C160/2017 4 Years P38/4424 08-Feb-18 07-Feb-22 103.16850 HA $3,081 $254 Prendergast Shear - C160/2017 4 Years P38/4513 02-Jul-21 01-Jul-25 2.01076 HA $1,481 $24 Wallaby - C168/2001; Wallaby - C168/2001 4 Years Note: a) The Qualified persons opinion is that licenses and tenements can be renewed or extended as require. Source: Granny Smith CPR, 2021 P a g e 23 | 136 3.4 Mineral rights description The operation of mining and associated activities at Granny Smith are governed by numerous Western Australian Government Acts. This section summarises published information available from the Western Australian Department of Mines, Industry Regulation and Safety (DMIRS). The Western Australian Mining Act 1978 (WA) (the Mining Act (1978)) is the principal legislation governing exploration and mining on land in Western Australia. Licenses and leases for, among other things, prospecting, exploration and mining must be obtained pursuant to the requirements of the Mining Act (1978) before the relevant activity can begin. Application fees and annual rental payments are payable in respect of each tenement. Where Native Title has not been extinguished, Native Title legislation may apply to the grant of tenure and some subsequent administrative processes. Heritage legislation may operate to preclude or regulate the disturbance of a particular area. Prospecting licences are granted over a maximum area of 200 ha and have an initial period of four years and can be extended by one period of four years. Exploration Licences are granted for five years plus a possible extension of five years and further periods of two years thereafter with 40 % per cent of ground to be surrendered at the end of year six. If the holder of a Prospecting or Exploration Licence establishes indications of an economic mineral deposit and expends a minimum level of investment, it may apply for a Mining Lease which gives the holder exclusive mining rights with respect to all minerals on the property. It is possible for one party to own the surface of the property and for another to own the mineral rights. An application for a Mining Lease must be accompanied by one of the following: A Mining Proposal completed in accordance with the guidelines. A statement of mining operations and a mineralisation report prepared by a Qualified person. A statement of mining operations and a resource report that complies with the JORC Code that has been made to the Australian Securities Exchange (ASX). The maximum initial term of a Mining Lease is 21 years, and the holder has the right to renew the lease for a further period of 21 years. Subsequent renewals are subject to the minister’s discretion and the lease can only be assigned with the consent of the relevant minister. Prescribed minimum annual expenditure commitments and activity reporting requirements apply to holders of Exploration and Prospecting Licences and Mining Leases. Miscellaneous Licences are granted for purposes such as a roads, infrastructure and pipelines. Mining operations on tenements in Western Australia must be developed and operated in compliance with various Commonwealth and State legislative requirements. The operation of Granny Smith is under the control of the following Western Australian Government legislation. Mining Act (1978) Environmental Protection Act (1986) and Environmental Protection Amendment Act (2004) Contaminated Sites Act (2003) Environmental Protection (Clearing of Native Vegetation) Regulations (2004) Rights in Water and Irrigation Act (1914) Conservation and Land Management Act (1984) Wildlife Conservation Act (1950) Country Areas Water Supply Act (1947) Aboriginal Heritage Act (1972) P a g e 24 | 136 Heritage of Western Australia Act (1990) Environmental Protection Regulations (1987) Environmental Protection (Unauthorised Discharge) Regulations (2004) Mining Rehabilitation Fund Act (2012) The operation of Granny Smith is also under the authority of the following Commonwealth of Australia Government legislation. Environmental Protection and Biodiversity Conservation Act (1999) National Greenhouse and Energy Reporting Act (2007) The governing Western Australian agencies are the Department of Water and Environmental Regulation (DWER), the Department of Planning, Lands and Heritage (DPLH) and the DMIRS. Mineral royalty rates are prescribed under the Mining Regulations 1981. For gold, an ad valorem royalty rate of 2.5 % is applied. Granny Smith also holds regulatory licences and registrations that govern various aspects of environmental management as disclosed in Section 16.1. 3.5 Encumbrances Other regulatory requirements including those associated with the operation and management of mining, rehabilitation and exploration activities are managed under the Mining Act (1978) in the form of tenement conditions administered by the DMIRS. Section 16.1 discloses the remediation and reclamation guarantees that are pertinent to Granny Smith. Granny Smith received no fines during 2021.
P a g e 25 | 136 3.6 Other significant factors and risks There are no other significant factors and risks that may affect access, title, or the right or ability to perform work on the Property. If mine expansions are required into areas currently held under an Exploration License, conversion to a Mining Lease is required prior to the commencing mining. This may also trigger negotiations under the Native Title Act 1993 with the relevant Traditional Owners, which must be undertaken prior to the grant of tenure. Aboriginal cultural heritage consultation, surveys and approvals are required for most mining and exploration activities, which requires engagement with relevant Traditional Owners. In most cases, agreements exist to facilitate this process. The permitting and licensing requirements required to start a new mining operation (or expand or modify existing operations) may also include local disturbance, clearing, environmental, power, water extraction and waste disposal, which follow well established authorisation protocols with the relevant government authorities. The Qualified persons are not aware of any other current or pending legal matters that may have an influence on the rights to explore or mine for minerals at Granny Smith. The Qualified person has relied on information provided by the Registrant in preparing its findings and conclusions regarding other significant factors and risks. A review of recent Company public disclosure documents including the annual report (Form 20-F for the 12 months ended 31 December 2021) do not contain any statements by the directors on any legal proceedings or other material conditions (other than as set out above) that may impact on the Company’s ability to continue mining or exploration activities at Granny Smith. 3.7 Royalties or similar interest Granny Smith also has an interest in a further 2 mining tenements covering 291 ha under the Merolia Joint Venture with Focus Minerals. Under the Joint Venture, Granny Smith has a free-carried 5 % interest in the tenements until a decision to mine is made, at which point Granny Smith will be required to contribute to Joint Venture expenditure, or dilute out of the Joint venture completely. P a g e 26 | 136 4 Accessibility, climate, local resources, infrastructure and physiography 4.1 Topography, elevation, and vegetation The topography of Granny Smith is characterised by low relief containing only a few low ridges with elevations ranging from 400 m to 420 m above sea level. The most significant geomorphological feature of the area is the 750 km² Lake Carey salt lake. The area is sparsely vegetated by mainly acacia species with larger eucalypts adjacent to creeks. The Qualified person’s opinion is that the revegetation proposed will adequately remediate any disturbance to the satisfaction of the community and authorities and the revegetation of tailings facilities will be in line with Company procedures and will minimise toxins. 4.2 Access Access to Granny Smith is via the unsealed Mt Weld Road from the town of Laverton (Figure 3.3.1). Laverton is 390 km and 950 km by sealed road from the cities of Kalgoorlie-Boulder and Perth respectively. The Wallaby operations are 13 km by road to the southwest of the Granny Smith process plant. Granny Smith is serviced by private charter flights from Perth to Laverton airport, four days a week. 4.3 Climate The climate is classified as semi-arid with temperatures ranging from an average minimum of 15 °C in July to an average maximum of 36 °C in January. Temperature extremes range from below freezing on winter nights to above 45 °C on summer days. Mean annual rainfall is 275 mm and although the mean monthly rainfall is relatively consistent, high rainfall events can occur during late summer and early autumn due to remnant cyclonic activity. However, these events are relatively rare and have little effect on mine operations. The most reliable rains occur in winter from cold fronts arriving from the west, and cloud bands from the northwest. January and February are the wettest months with an average of above 40 mm. Evaporation rates are high and there are no naturally occurring perennial lakes, streams or rivers in the region. No extreme climate conditions are experienced that materially affect operations apart from periodic high rainfall events which can temporarily interrupt operations. 4.4 Infrastructure Granny Smith is currently an underground gold mining operation with associated infrastructure and facilities that operate year-round. In addition to the Wallaby underground mine accessed by decline, major infrastructure owned and operated by Granny Smith includes a 3.5 Mt per annum CIP process plant, tailings storage facility (TSF), haul roads, administration centres and an accommodation village (Figure 3.3.1). Other significant facilities include: Reagent storage and mixing facilities. Process laboratory. Process maintenance and warehouse facilities. Power generation plant and substation. Fuel storage. Raw water tanks and reverse osmosis water treatment system. Process water storage pond. Airstrip. P a g e 27 | 136 Borefields. Paste Plant. Additional administration offices (mine engineering, geology, mine safety and training), a mine equipment workshop, warehouse and core yard are located at the Wallaby mine. The main gas fired power station is located approximately halfway between Granny Smith and Wallaby. A new hybrid power system, comprising more than 20,000 solar panels (7 MW capacity) supported by a 2 MW/1 MWh battery system was commissioned in 2020 to supplement the existing gas power station. In 2021 Granny Smith signed a Water Agreement with Mt Weld Mining to continue freshwater supply until October 2023. Granny Smith owns and maintains the infrastructure (including powerlines, production bores, monitoring bores, pumps and pipelines) associated with the Mt Weld Bore field while suppling water to Mt Weld Mining and Granny Smith. An additional freshwater source, North Keringal Borefield, is under contraction with production bores, monitoring bores, roads and power lines scheduled for completion in Q1 2022. This water source will supply up to 1 Gl of freshwater per year. An additional Stage 2 North Keringal Borefield is currently in planning phase and is expected to be able to supply an additional 1 Gl per year for Granny Smith. The 950 room accommodation village is located 1.5 km west of the process plant. The majority of the Granny Smith workforce are fly-in fly-out (FIFO) from Perth with a small number of employees residing in Laverton and Kalgoorlie. Work rosters are predominantly based on 8 days on, 6 days off cycles; however, some contractors operate on longer rosters such as 2 weeks on, 1 week off. Supplies are delivered to site via road transport from either Kalgoorlie or Perth via Mt Weld Road Further details regarding the infrastructure are provided in Section 15. The nearest population centre is the town of Laverton, 23 km to the north, with a population of 1,217 as at 2017. Facilities at Laverton include an airstrip, accommodation, police station, hospital, general store, supermarket, post office, service station, school, library, aquatic centre and hotel. The closest major population centre is the city of Kalgoorlie-Boulder (population of approximately 30,000). 4.5 Book Value The economic analysis disclosed in Chapter 19 is in respect of attributable Mineral reserves only and excludes Mineral resources and lower grade material. The assumptions, parameters and cashflows are only intended to support the reserve declaration of the operation. Certain assumptions and estimates might differ from the long-term outlook or actual results of the operation, including the commodity prices used, which are materially different from current spot prices. Changes in these assumptions may result in significant changes to mine plans, models and the NPV of the operation. The Mineral reserves will therefore not necessarily represent the total future economic benefit that can be derived from the Property. Net Book value of property plant and equipment consists mainly out of land, mining infrastructure, mine development, mineral and surface rights and processing plant related assets of the Property. Granny Smith has a book value of $359.6. The Qualified person is of the opinion that the book value estimated as described is expected to be different to the NPV for the attributable reserve only. P a g e 28 | 136 5 History Gold was first identified and pegged in the Granny Smith area by prospector Raymond Smith in 1979. Following a series of exploration joint ventures, significant bedrock gold mineralisation was identified by Canyon Resources Ltd in 1982. The tenements were subsequently acquired by Delta Gold NL in 1983. At around the same time, CSR Limited identified gold mineralisation on the adjoining tenements and a joint venture was formed with Delta Gold in 1984. Drilling programs completed between 1985 and 1988 outlined the Windich, Granny and Goanna gold deposits. In 1988, CSR sold its interest to Placer Pacific Ltd (60 %) with the remaining 40 % held by Delta Gold. In 1989, a feasibility study was completed, and production commenced at the Granny pit and continued concurrently with the development of Goanna, Windich and other nearby satellite pits. The Wallaby deposit was discovered in 1998 following the acquisition of the adjoining ground from Newcrest Mining Ltd in 1992. First open pit ore was mined in 2001 and underground operations commenced in December 2005. Barrick Gold acquired Placer Dome in 2006 and Gold Fields acquired 100 % of Granny Smith in Q4 2013 as part of its purchase of Barrick Gold’s Yilgarn South operations. At Wallaby, underground exploration drilling in 2021 continued to expand the footprint of the Zone 135 lodes, the deepest planned mining area at ~1,450 m below surface. Exploration drilling is ongoing down to Zone 150, along with regional exploration programs evaluating other high- quality surface exploration targets. The Qualified person is of the opinion that the historic exploration results have been superseded and supplemented by more recent exploration undertaken by Gold Fields for areas of current interest and that any historic errors or deficiencies will have little influence on the current Mineral resource models or the life-of-mine reserves.
P a g e 29 | 136 6 Geological setting and mineralisation 6.1 Geological setting Granny Smith is in the Kurnalpi Terrane of the Archean Yilgarn Craton, a 2.7 Ga granite-greenstone terrane in southern Western Australia. At a regional scale, the host greenstone belt is dominated by the Mt Margaret Dome in the northwest and the Kirgella Dome in the southeast (Figure 6.2.1). These domes are flanked to the east and west by north-northwest striking shear zones of the Laverton Tectonic Zone, with the central zone between the two domes being dominated by north to north- northeast striking sigmoidal shear zones. These distinctly different strikes to the shear zones developed early in the tectonic evolution and resulted in a favourable architecture for late-stage orogenic gold mineralisation. The stratigraphy of the Laverton region is defined broadly by a mafic–ultramafic succession overlain by an intermediate volcanic succession, which in turn, is overlain by siliciclastic basin successions (e.g. Granny Smith Basin and the Wallaby Conglomerate) and intruded by temporally and chemically distinct suites of felsic to mafic intrusive rocks. A significant unconformity occurs between the intermediate volcanic succession and the overlying siliciclastic basins. The basin forming mechanisms are the source of much debate, varying from remnants of a region-wide basin, perched basins developed in a fold and thrust belt, to extensional basins. There are two distinctly different types of basin successions; one forming linear geometries such as the Mt Lucky Conglomerate, and a second type; the Wallaby Conglomerate, that wraps around the southern margin of the Mt Margaret Dome. 6.2 Mineralisation 6.2.1 Granny Smith corridor The Granny Smith gold deposits (including the Windich, Granny and Goanna lodes) occur along a north-trending structural corridor (Figure 6.2.3). The eastern contact zone of a granitoid intrusion within the metasedimentary rocks is the locus of the Granny Smith corridor mineralisation. The metasedimentary rocks consist of quartz-rich greywacke, lithic wacke and minor shale, and sandstone interbeds, with a basal conglomerate of clasts of shale, quartz, quartzite, BIF and feldspar-phyric volcanic rocks. The Granny Smith granodiorite is a small (2 km × 5 km) elongate pluton which is porphyritic and has mafic-rich margins. Aplitic pegmatite dykes, which only cut the granitoid, represent the last magmatic phase. The present erosional level is close to the roof of the pluton, and in places has a thin cap of sedimentary rocks. P a g e 30 | 136 Figure 6.2.1: Granny Smith – regional geology Source: Granny Smith CPR, 2021 P a g e 31 | 136 Figure 6.2.2: Granny Smith – stratigraphic section Source: Granny Smith CPR, 2021 P a g e 32 | 136 Figure 6.2.3: Geology of the Granny Smith mineralised corridor Source: Granny Smith CPR, 2021 The pluton is surrounded by a 200 m-300 m wide contact metamorphic aureole that is progressively zoned from the granitoid contact outwards through a several metres-wide hornfelsed margin, to an andalusite-bearing slate, and finally to a slate with mica spots. Intrusive breccias and miarolitic cavities suggest a high-level intrusion, where a volatile phase was exsolved from the magma during or after high-level emplacement. The granitoid and gold mineralisation are cut by carbonatite and lamprophyre dykes. Late-stage plagioclase porphyry dykes have also intruded into the sedimentary sequence.
P a g e 33 | 136 Gold mineralisation within the Granny Smith corridor is closely associated with a north-south striking and shallow east-dipping reverse (thrust) fault zone that partly follows the contact between the granitoid and host sedimentary sequence. Some of the porphyry dykes in the sedimentary sequence and their contacts are also mineralised. Mineralisation occurs along a strike length of 3.7 km and has been observed up to 850 m down dip on the main east dipping lodes but remains open at depth. Conjugate west dipping lodes extend up to 350 m off the main trend at intermittent intervals and are more regular at the southern (Windich) end of the Granny Smith corridor. The gold mineralisation follows the granitoid contact where it dips at low angles (<50°). Some of the highest grades are recorded from the sediments just above the intrusive contact where the contact is shallow dipping and irregular. However, where the dip of the contact is greater, mineralisation occurs either in the granitoid or roughly follows bedding in the sedimentary rock. Mineralisation within the granitoid, is confined to a sub-horizontal zone that can be up to 60 m thick. Brittle and brittle-ductile deformation has occurred in the granitoid and sedimentary units respectively. Two stages of alteration associated with gold mineralisation are recognised in the Granny and Windich deposits. These include: Earlier hematite alteration and sericite-carbonate overprinting alteration. The widespread and pervasive hematite alteration is exhibited as a hematite dusting of the feldspars in the granitoid. Fracture controlled sericite-carbonate alteration in the alteration envelopes of a network of thin millimetre-scale ankerite-quartz breccia veins, which represents the main mineralisation stage. Gold occurs in both the veins and alteration haloes. Gold grade is strongly correlated with the intensity of associated pyrite alteration, and typical high-grade ore is a thoroughly brecciated and bleached, ankerite-pyrite-silica±sericite altered rock. Pyrite is the main sulphide phase; however, there is minor pyrrhotite, chalcopyrite, galena, sphalerite and arsenopyrite. Gold, silver and lead tellurides occur mainly in rare late-stage quartz-ankerite veins. At Windich, the gold mineralisation occurs in both the granitoid and sedimentary units. The controls on mineralisation are similar to those at the Granny deposit; however, the dip of the contact is generally steeper with a wider zone of low-grade mineralisation in the granitoid. Goanna is the northernmost and smallest of the three deposits within the Granny Smith corridor. The deposit is entirely within the sedimentary units, with more banded iron formation and no conglomerate units. The gold mineralisation is hosted predominantly by coarser grained sedimentary units, with the mineralised (alteration) zone approximately 5 m thick but can be up to 15 m thick. The highest gold grades occur where the moderately east dipping, reverse fault intersects BIF in the hangingwall. The gold mineralisation is associated with intense pervasive alteration consisting of silica-pyrite ± Fe-carbonate-sericite-albite. Veining (quartz-carbonate) within the mineralised zones is generally absent. 6.2.2 Wallaby The Wallaby gold deposit is hosted within a thick matrix-supported, mafic conglomerate unit (Wallaby conglomerate) that dips moderately to the southeast and is intruded by a suite of fractionated alkaline dykes on the south-eastern margin of the Mt Margaret Dome. Regional-scale structures near the deposit include: Dominant north-south trending, near vertical fault systems such as the Chatterbox Fault. East-northeast trending faults, dipping moderately to steeply to the south. The Chatterbox Fault is hypothesized as one of the main structures that control the location of the Wallaby deposit. The east-northeast faults are interpreted as extensional faults developed during basin growth that were later inverted. One of the largest of these structures, Thet’s Shear, is a 250 m wide zone of intense alteration and ductile deformation that underlies the Wallaby deposit P a g e 34 | 136 The alkaline dyke suite in the core of the Wallaby gold deposit displays increasing fractionation from an early-stage northeast trending mafic monzonite through to monzonite, followed by syenite, syenite porphyry, and late-stage carbonatite. The intrusives are concave in profile, stacked one above the other, plunge 50º to the south and are inferred related to the intersection of north-south and northeast trending structures. Late-stage post-mineralisation lamprophyres occur as narrow east-northeast trending vertical dykes. A 600 m × 800 m wide zone consisting of actinolite-magnetite-calcite ± epidote ± pyrite alteration affects the intrusives and conglomerates and forms a broadly pipe-shaped body dipping approximately 50 º to the south. Early magmatic intrusions such as mafic monzonite and monzonite are overprinted by the actinolite-magnetite-calcite alteration, while younger syenite and porphyritic syenite intrusions are unaltered. This suggests that some intrusions predate or are synchronous with the main alteration event. The distal alteration assemblages comprise chlorite, calcite and magnetite, with the magnetite content decreasing with distance from the centre of the pipe. The actinolite-magnetite-calcite alteration event is accompanied by the formation of generally <20 cm calc-silicate veins that comprise assemblages of mostly andradite garnet and clinopyroxene and abundant carbonate-rich veins up to 1 m thick, with variable amounts of biotite, magnetite and garnet. Four dominant gold-related structural domains are identified in the Wallaby deposit: Fracture mesh lodes developed at the intersections of brittle structures (faults and veins), dip and strike changes along structures, and gold mineralisation linked to the development of laminated and quartz breccia veins. These develop due to the intersection of primary fault structures or between closely spaced primary fault structures via linking extension veins (tension gashes). The primary fault structures (or backbone structures) are identified by the existence of parallel laminated quartz veins (1-5 cm wide) and strong dolomite alteration adjacent to these faults. Horsetail domain lodes developed where the lode fault diverges into multiple faults with extensive extension veins formed between the faults. The mineralisation-related alteration is restricted to discrete zones around the faults, with the bulk of the wallrock containing barren actinolite-magnetite alteration. The horsetail domain is viewed as a small fractal version of the main fracture mesh lodes. Ductile shear-controlled gold lodes resulting from the intersection between brittle structures and earlier ductile shears and cleavages associated with north oriented shearing. The lodes are marked by a series of discrete anastomosing brittle faults that have minimal parallel veining with extensive mineralisation between these structures. The mineralisation is variably developed with gradational alteration contacts following the ductile shears away from the lodes. Hematite associated gold lodes distinguished by an assemblage of quartz, iron-rich dolomite, hematite and gold. These lodes are overprinted by later gold lodes (fracture mesh and ductile shear) associated with sinistral movement. The gold lodes form a series of stacked zones with two distinct geometries; 5 to 20 m thick sub-horizontal to gently northeast dipping lodes measuring approximately 800 m along strike and 1.1 km down dip and narrower, moderately northeast-dipping lodes. The major flat lying lodes typically have vertical separation of 150-250 m and offset to the south with depth, following the hanging-wall of Thet’s shear zone (Figure 6.2.4). Existing models suggest that the low angle lodes formed within a north-west/south-east phase of compression. A series of east-west striking vertical lodes is present as linking structures between the main horizontal lodes. The main gold mineralising event is associated with dolomite-albite alteration which bleaches the conglomerate to a distinctive fawn/green colour. Sulphidation appears to be the main gold deposition mechanism. Lower grade areas are associated with carbonate-biotite and early-stage hematite alteration. P a g e 35 | 136 Figure 6.2.4: Wallaby lodes and intrusive system (west view) Source: Granny Smith CPR, 2021 Gold occurs along micro-fractures within pyrite and generally ranges from 1 -20μm in size. It also occurs as larger (up to several millimetres) grains within quartz veining, either in strongly dolomite-albite altered rocks or in small veins within a few metres of an ore zone. Coarse visible gold is also observed in narrow (<5 mm) moderate to steeply dipping quartz-carbonate veins. P a g e 36 | 136 6.2.3 Hillside The geology of the Hillside gold deposit, 6 km south-west of Granny Smith, comprises three zones separated by two interpreted north-northeast trending first order faults of the Laverton Tectonic Zone (Figure 6.2.1): Western zone - mafic volcanic rocks, BIF, argillite and arenite with irregularly developed polymictic conglomerate. Central zone – basalt, ultramafic flows, argillites, BIF and minor dolerite. Eastern zone - shale and turbiditic sequence intruded by dolerite. The area has undergone metamorphism to greenschist facies. Gold mineralisation at Hillside is hosted by a carbonate-muscovite-quartz-pyrite-(magnetite-biotite) altered basalt exhibiting a pervasive shear fabric. There is frequent segregation into carbonate-quartz-rich and muscovite-rich domains, leading to a banded appearance. Mineralisation occurs along a strike length of 480 m and extends 200 m down dip. Three generations of quartz veining are recognised. Thin ptygmatic and isoclinally folded veins and foliation-parallel veins, interpreted to be pre to syn-shearing. These are not mineralised. Sub-horizontal, gently west-dipping extensional quartz-carbonate veins with strongly developed carbonate- muscovite-quartz-pyrite-arsenopyrite selvedges. These veins crosscut the shear fabric and are the main host for the gold mineralisation. Steeply west to southwest-dipping quartz veins, that also crosscut the shear fabric, and have somewhat weaker alteration selvedges. These veins can also host gold mineralisation. Pyrite and arsenopyrite are the two major sulphide phases present. Gold appears to be associated intimately with arsenopyrite.
P a g e 37 | 136 7 Exploration 7.1 Exploration Exploration activities at Granny Smith during 2021 were focused extensions to the Wallaby deposit to increase Mineral resources and Mineral reserves, and across the broader tenement package with the aim of discovering new gold deposits. Given Granny Smith is a well-established production stage property with a significant Mineral resource and reserve base, it is not disclosing any exploration targets During 2021, $12.7 m (A$17 m) was spent on near-mine exploration at Granny Smith. The mine’s Mineral reserves increased by 2 % to 2.2 Moz and Mineral resources increased by 2 % to 8.1 Moz. Drilling activity was focussed on infill and extensions to Zones 135 and 150 at Wallaby. 7.2 Drilling 7.2.1 Type and extent During 2021, 72,947 m of drilling was completed, with most activity focused on extending known mineralisation at Wallaby. Drilling activities were undertaken elsewhere on the property on early stage projects with potential to provide new mining fronts in the future. Granny Smith is a production stage property and the results from this work are not considered material for the purpose of this report. The Qualified person’s opinion is that a register of individual drill results would be too voluminous, potentially misleading and not relevant to the current reporting of Mineral resources and Mineral reserves. In-mine exploration and resource diamond drilling at Wallaby included extensional drilling targeting Zone 135 and Zone 150 (Figure 6.2.4). A summary of the exploration drilling physicals for 2021 is shown in Table 7.2.1. Table 7.2.1: Summary of Granny Smith drilling – 2021 Type For the year ending 31 December 2021 Metres A$m US$m Air Core 0 $0 $0 Reverse Circulation 2,850 $0.2 $0.1 Diamond Core Drilling 70,098 $9.6 $7.2 Total 72,947 $9.8 $7.3 Note: a) Drilling costs only. No additional costs such as assaying or administration quoted on this table b) Infill exploration is reported separately from exploration. c) Average exchange rate A$1:US$0.7511. d) All procedures and parameters applied to the surveys and investigations are appropriate for the style of mineralisation being prospected. e) The exploration programs have confirmed continuity of geology and controls on gold mineralisation in key areas. f) There were no material variations encountered during the 2021 exploration programs. g) Based on the 2021 exploration and results a 2022 exploration budget has been approved to retain traction on the programs and to progress leading projects. Source: Granny Smith CPR, 2021 All Surface Exploration Drilling Services are provided by Ausdrill Pty Ltd. Diamond drilling is conducted via KWL 1600 diamond drill rigs usually using HQ hole diameters through the weathered zone and changing to NQ2 size once competent ground is reached. All Underground Exploration Drilling Services are provided by Barminco Pty Ltd. Diamond drilling is conducted using a variety of diamond drill rigs including: Epiroc Diamec U8 Epiroc Diamec MCR P a g e 38 | 136 Epiroc Diamec Smart 6M Newland Erebus Boart Longyear LM90 All underground diamond drill rigs usually use HQ and NQ2 hole diameters. 7.2.2 Procedures Survey Underground drill collar positions are surveyed by the mine surveyors using a Leica Total Station. A TN-14 Gyro tool is used by the drillers to align the rig to the correct azimuth and dip while using foresight and backsight markups as a reference for rig positioning. Surface drill collar positions are set out using a Garmin handheld GPS and picked up by the mine surveyors using differential GPS. Wallaby, Granny Smith/Hillside have different local grids. The Wallaby grid is oriented +00° 20' 08” from true north and the Granny Smith /Hillside grid is oriented +00° 16' 40” from true north. Regional scale (outside of the mine areas) maps and sections are produced using MGA94 Zone 51 coordinates. All drillholes are picked up in local grid and converted to MGA94-51 grid using acQuire© software. Both sets of coordinates are stored. All recent DD holes were surveyed downhole using a single shot camera and non-magnetic, multi-shot gyro. Downhole surveys are routinely undertaken by the drilling contractor and validated by a geologist. RC drillhole samples are collected every metre via a cyclone with the whole sample presented to a splitter attached to the cyclone from which a 3 kg – 5 kg sample is produced. Most samples are dry on collection. Where wet samples are encountered, this information is recorded and preserved in the database against that interval. AC drillhole samples are collected in a bucket/bag via a cyclone with 2 m composites weighing 2 kg – 3 kg produced. In paleochannels, 1 m composites are collected. Both the RC and AC samples are taken by the rig offsider whilst drilling and collected by the field technicians. Diamond core sampling is completed on whole (grade control) or half core. DDH samples are taken according to a cut sheet compiled by the geologist. Sample intervals range from 0.3 m – 1.0 m around mineralised structures and areas of altered intrusive material. Sampling is continued for 6 m and 2 m outside major and minor mineralised structures respectively. Where the core is not required to be cut, whole core samples are taken (underground mine definition and grade control drilling). When core is to be half core sampled it is orientated by assembling it along a steel orientation bar. Successful orientation marks are indicated on the core by a red line at the start of the drill run marked by the drill crew. Once the core is assembled, orientation marks are inspected and checked for accuracy. Orientation lines are marked on the bottom of the hole. The core is cut using a core saw along the orientation line, with the resulting half core closest to the operator being sampled and the remainder of the core being retained. Core recoveries are measured by geological staff as a percentage between core runs. In general, core recoveries are very high and there are no issues with samples not being representative. Grade control channel samples are also collected from underground faces using a jumbo drill depending on the geology and alteration present. The samples are retrieved with a sample catcher basket attached to the boom. Five to seven channel samples are usually taken from each face. Samples for analysis are assigned a unique sample number for internal and database tracking and laboratory processing and are bagged in pre-numbered calico bags and submitted with a sample submission form. Drill rig supervision is performed by a suitable GFA representative. P a g e 39 | 136 There are no drilling, sampling, or recovery factors that could materially affect the accuracy and reliability of drilling results. The Qualified person’s opinion of the 2021 exploration and resource extension drilling is: a) All drilling and exploration field activities are supervised to ensure health and safety and maintain appropriate technical standards. b) The drillhole surveys are adequate by type and length for the intended purpose. c) Utilising orientated core significantly enhances recorded information to assist with 3-D modelling. d) The drillhole database and subsequent modelling aligns to core recovery losses and should not cause material errors. e) Post QA/QC screening and validation exploration results are incorporated into the estimation of Mineral resources; the categorisation of Mineral resources is described in Chapter 11. f) Validated exploration results are used in the 31 December 2021 Mineral resource estimation. Individual exploration drillhole information is not viewed as significant or material to the Mineral resource and Mineral reserve reporting at Granny Smith and consequently exploration data is not presented. Core orientation A Reflex ACT II RD or ACT III orientation tool is used to orient the drill core. An orientation is attempted every run. At the core farm, the oriented core is prepared by assembling it along a steel orientation bar. Successful orientation marks are indicated on the core by a red line at the start of the drill run marked by the drill crew. Once the core is assembled, orientation marks are inspected and checked for accuracy. Orientation lines are marked on the bottom of the hole, allowing the orientation accuracy information to be seen on core photographs. At least two continuous good orientation marks are required before information recorded from the orientation line can be gauged as accurate, with three continuous orientation marks indicating a high level of accuracy. Logging Data collected includes detailed logging of all drillhole chips and core to extract maximum data and value from the available information. The logging may be as broad spaced as 1 m composite chips for AC and RC drilling to centimetre scale for structures and alteration in diamond core. In most cases routine data collected includes lithology, structure, stratigraphy, mineralisation, alteration, geophysical (magnetic properties) and geochemical properties (multi- element assays) and physical measurements (rock hardness, geotechnical RQD's, density, acid rock drainage). Core recoveries and density measurements are also taken. Core recoveries are measured by geological staff as a percentage between core runs. In general, core recoveries are very high and there are no issues with samples not being representative. AC and RC sample recovery are usually of no concern. In case of poor sample recovery, the driller will document this on the drill pods and the geologist will also take note during the logging process. Standard logging conventions (lithology, alteration, structures and quartz veins) are used to capture the information. Most of the observations are captured electronically using acQuire® logging software on laptops, while the remainder is recorded on paper. Numerous validation steps are built into the acQuire® logging software and all codes are selected from drop down lists. Diamond core is delivered by the drilling contractor to the Wallaby and Exploration core farm facilities where it is logged and processed for sampling. AC and RC logging is usually conducted in the field directly from drill spoils or at the office from representative sub-samples collected by field technicians into chip trays. All data is uploaded into the mine acQuire® database via a wireless network. P a g e 40 | 136 In some cases, additional work is completed off site by technical experts including petrographic analyses, mineralogy, and geochronology as part of ongoing research and development cooperative ventures. This data is included in standard reports and in the database for future use. Security Although security is not strongly enforced, Granny Smith is a remote site and the number of outside visitors is small. The deposits are known to contain visible gold and this renders drill core susceptible to theft; however, the risk of sample tampering is considered low. Sample collection and storage is undertaken by dedicated Gold Fields personnel and is subject to internal systems and staff audits, SOX controls and audits. All recent exploration diamond drill core is retained in the core farm at Granny Smith Exploration office for current and future reference. Pulps returned from the analytical laboratory are stored in labelled individual paper envelopes within labelled cardboard boxes. Recent (post 2014) RC chips are stored in labelled sealed compartment trays. Appropriate procedures and systems are in place to document, store and access retained material. Sampling data is captured via computer applications and written directly to the database. Controls on the database restrict the input and storage of data to acceptable values. Further database controls prohibit the use of unauthorised and duplicate sample identifiers and similar problematic data. 7.2.3 Results In-mine exploration and resource drilling at Wallaby focused on infill and extensions of Zone 135 and Zone 150. Infill of Zone 135 confirmed continuity of the main lode Mineral resource with all holes returning mineralised intercepts. Drilling identified an extension of the Zone 135 Vertical East lodes to the east and confirmed mineralisation and extensions of the Zone 135 Vertical South lodes. Zone 150 extensional drilling identified mineralisation at expected depths which returned assays of economic tenor within the 2021 Mineral resource. The 2022 exploration program will continue to focus on Mineral resource and Mineral reserve growth at Wallaby through extensions both laterally and at depth with further drilling of the Zone 135 Lateral and Vertical lodes to close- out open areas and define the full orebody footprint. 100 x 100 m conversion drilling in Zone 150 will continue to test geological and grade continuity in the southern half while 50 x 50 m infill drilling will commence in the northern half. The aim is to complete 50 x 50 m drilling on >70 % of the Zone 150 Main lode for a pre-feasibility study starting in Q1 2023. (Figure 6.2.4)
P a g e 41 | 136 Figure 7.2.1: Schematic long-section through Wallaby Source: Granny Smith CPR, 2021 The Qualified person’s opinion of the 2021 exploration and resource extension drilling is: a) All exploration activities, including drilling, database management, validation and QA/QC, prior to incorporating relevant data into the resource modelling and estimation process, is viewed as sufficient, appropriate, technically assured and suitable to support Mineral resource estimates. 7.3 Hydrogeology The hydrogeological model has gradually been refined, based on new information derived from the installation and testing of the Wallaby Borefield and the monitoring of aquifer responses to groundwater abstraction during mining. The established hydrological conditions for Wallaby include: 1. Alluvial and aeolian ‘superficial formations’; a shallow permeable alluvial system that is hydraulically connected to Lake Carey and dewatered/depressurised by production bores and also drained by the connecting, deeper, palaeochannel bores. This is typically present as lenses of vuggy ironstone, calcrete and sands that for a typically 26 m – 32 m thick aquifer with preferred groundwater flow lines. Increased thicknesses occur above ancient and current drainage lines and beneath Lake Carey. 2. The superficial aquifer is underlain by lacustrine, transported clays of low permeability that form a confining bed about 40 m thick. This unit commonly has irregularly distributed beds of sand and ironstone gravel. 3. Palaeochannel silts, sands and gravels of the Carey Palaeochannel, in the western portion of the Wallaby Deposit; a regional permeable palaeodrainage system dewatered/ depressurised by production bores. The upper part of the palaeochannel is characterised by silty sands that fine upwards into predominantly silty and clayey beds. The lower palaeochannel and margins are characterised by sandy clays inter-fingered with non-consolidated sand lenses. P a g e 42 | 136 4. Weathered and fractured conglomeratic bedrock. A basement system with variably developed secondary permeability and variably developed overlying oxide profile, both of which are drained by the underground workings. The Qualified person’s opinion of the 2021 hydrology is: a) Granny Smith has reliance on appropriate hydrological studies conducted at all relevant sites. b) Hydrology is not viewed as presenting a material risk to Granny Smith or the December 2021 Mineral resource and Mineral reserve estimates. 7.3.1 Groundwater Levels The water table is within a few meters of the ground surface with water flow being modelled from north to south towards Lake Carey. The drawdowns for the bores have been discretised to estimate the horizontal groundwater gradients within each of the four main aquifer intervals as shown in Table 7.3.1. Table 7.3.1: Estimated horizontal groundwater gradients Aquifer Average groundwater level (mAHD) Estimated horizontal groundwater gradient Baseline groundwater table (mAHD) Superficial 381.04 0.01 395 Upper Paleochannel 348.34 0.06 395 Lower Paleochannel 340.42 0.06 395 Bedrock 303.97 0.05 395 Source: Granny Smith CPR, 2021 7.3.2 Aquifer Permeability Results from a series of aquifer tests are available from testing undertaken on exploration holes during the Wallaby pre-feasibility study (PFS) in 2000 and subsequent hydrogeological studies for the underground developments. A summary of the local interpreted permeability (hydraulic conductivity) is shown in Table 7.3.2. Table 7.3.2: Derived Permeability Parameters Formation Estimated Hydraulic Conductivity (m/day) Feasibility Study Wallaby Borefield Superficial Sediments 2.5 2.5 Lacustrine Clay 0.001 0.1 Upper Paleochannel Sand 25 14 Lower Paleochannel Sand 25 14 Fractured Bedrock 25 0.001-5 Source: Granny Smith CPR, 2021 The majority of the excavations underground are dry except where water-bearing structures are exposed and thus corrosion is not considered a major issue with fully encapsulated reinforcement for all capital infrastructure. Discrete seepage zones have been encountered as geological features are traversed, many of which remain damp (<1l/sec) for the duration of mining. Only minor rehabilitation due to corrosion and water related issues has been required to date and mainly in upper levels in Z70 and Z60. P a g e 43 | 136 7.3.3 Dewatering Mine dewatering is an integral part of the Wallaby Project, due to the presence of aquifers formed by the Carey Palaeochannel sediments and local permeable fractured rocks. The mine is dewatered using in-pit sumps and ex-pit production bores. There are a series of groundwater monitoring bores at the site, which are located: Around the perimeter of the pit crest (‘Pit Piezometers’). Up to a few kilometres away from the pit crest (‘Regional Monitoring Bores’). Up to 10 km away from the pit crest (‘Stock Bores’). These bores are regularly monitored for groundwater level and groundwater quality by dewatering and external consultant PANDO, to determine the localised and regional impacts of the mine dewatering activities. The water control measures established to date comprise: Dewatering bores. Sumps and pumping stations. Vibrating Wire Piezometers 7.4 Geotechnical Geotechnical domains at Wallaby are based on lithology and rock mass characteristics and consist of hangingwall and footwall conglomerate, the ore zone and intrusive units. The hangingwall and footwall units are reasonably consistent and are separated into geotechnical domains based on stope and development design. The ore zones and lode structures occupy sub-horizontal fracture zones, which have later been annealed. The intrusives (syenite, porphyry and monzonite) are considered brittle rock mass zones. The Qualified person’s opinion of the 2021 geotechnical work is: a) Granny Smith has completed all appropriate testing for the current life-of-mine reserve and continues to test all new significant discoveries. b) Geotechnical domains and lithologies are based on core logging and modelled by the Geology department. c) Sample testing is adequate for the purposes of this report. d) The quality of the sampling and laboratory testing is adequate to support the Mineral resource and Mineral reserve estimates. 7.4.1 Rock mass properties Geotechnical data is obtained from geotechnical logging of resource and exploration DD holes, dedicated geotechnical drillholes and ore drive mapping. During specific zone feasibility studies, material properties testing is completed. In order to obtain representative values for each rock type, several specimens have to be tested. This includes Uniaxial Compressive Strength (UCS) and Uniaxial Tensile Strength (UTS), Young’s modulus (E) and Poisson’s ratio (υ). Representative numbers of core samples for laboratory tests at project feasibility stage are shown in Table 7.4.1. Testing of rock mass properties is generally completed by any NATA accredited testing facilities such as Western Australian School of Mines (WASM) or E-precision. Table 7.4.1: Required representative samples for laboratory testing Type of test Samples Underground Direct Shear (for weathered rock, saprolite, fault gouge, etc.) 5 per domain Uniaxial Compressive Strength (UCS) (with Youngs Modulus and Poisson’s ratio determination) 5 per lithology P a g e 44 | 136 Triaxial Compressive Tests (5 suites at four confining pressures) 20 per lithology Brazilian Tensile Strength 5 per lithology Acoustic Emission (AE) 3 per site Source: Granny Smith CPR, 2021 In-situ stress data are also systematically collected using Acoustic Emission and CSIRO Hollow Inclusion cell testing. Data collected from geotechnical logging, which includes RQD, is used to assess the rock mass characteristics using Bartons’ Q-System which is used in the stability analysis and planning process. Further geotechnical mapping to complement the data from core logging is also conducted during development. Geotechnical inspections and QA/QC data are also used to monitor performance and feed back into the design process. Seismic activity is monitored in real-time by 47 sensor arrays spatially located between Zone 70 through to Zone 110. Seismic system upgrades occur on a regular and systematic basis to keep up with the depth and level of mining extraction. The seismic events are triggered by slippage along the structures or due to high stress at depth. Stress effects events have become more evident as mining progresses deeper with the Zone 90 lode representing the transition from low stress to high stress environment. Zone 100 is largely considered a pivotal depth of mining where Wallaby has transitioned to a geotechnical constrained, seismically active mine. 7.4.2 QA/QC of geotechnical data Geological diamond core is logged by the Geology department and recorded in the database in acQuire®. A separate geotechnical logging database has been created in acQuire® for capturing geotechnical information. All diamond drillholes are photographed for future reference. The established database in acQuire® along with the stored photograph from diamond drillholes ensures that the validation of the data and the QA/AC can be completed with minimum effort. The validation is generally completed by reviewing the entire database and compare against the results for any abnormalities or values that has been assigned to wrong lithological features.
P a g e 45 | 136 7.5 Density Density testing is undertaken on-site by core yard technicians using the water immersion method. Densities are calculated using the below formula. 𝐷𝑒𝑛𝑠𝑖𝑡𝑦 = 𝑚𝑎𝑠𝑠 (𝑑𝑟𝑦)/(𝑚𝑎𝑠𝑠 (𝑑𝑟𝑦) − 𝑚𝑎𝑠𝑠( 𝑖𝑛 𝑤𝑎𝑡𝑒𝑟)) The densities applied by area are summarised in in Table 7.5.1 to Table 7.5.3. Table 7.5.1: Granny Smith density values Block Model Domain Density (t/m³) Air 0 Fill/dumps 1.8 Complete oxidation 2.2 Partial oxidation 2.47 Granodiorite Partial oxidation & fresh 2.67 Felsic porphyry Partial oxidation & fresh 2.67 Banded iron formation Partial oxidation & fresh 2.74 Meta-sediment Partial Oxidation & fresh 2.74 Source: Granny Smith CPR, 2021 Table 7.5.2: Wallaby density values Conglomerate ore (t/m³) Intrusive ore (t/m³) Conglomerate waste (t/m³) Intrusive waste (t/m³) Zone 250-60 oxide All lithology types 1.90 Zone 250-60 transitional All lithology types 2.51 Zone 250-60 fresh 2.73 2.65 2.77 2.62 Zone 70 2.77 2.66 2.77 2.66 Zone 80 – Zone 90 2.81 2.72 2.87 2.75 Zone 100 2.84 2.72 2.87 2.78 Zone 110 - 120 2.81 2.71 2.84 2.72 Zone 135 2.82 2.71 2.83 2.72 Zone 150 2.82 2.71 2.83 2.72 Source: Granny Smith CPR, 2021 Table 7.5.3: Hillside density values Block Model Domain Density (t/m³) Air 0 Cover/transported 1.78 Complete oxidation 2.35 Partial oxidation 2.63 Fresh 2.76 Source: Granny Smith CPR, 2021 The Qualified person’s opinion of the density work is: a) The bulk density testing is adequate for the intended purpose and the tonnage estimation based on the bulk densities appear to have little bias. b) Bulk densities are consistent with lithology and ore types estimated over a ±25 year mining history. P a g e 46 | 136 8 Sample preparation, analyses, and security 8.1 Sample preparation All resource development and exploration samples for preparation and analysis are dispatched to Australian Laboratory Services (ALS) in Kalgoorlie or Perth by truck. Underground grade control and face samples are dispatched to the Granny Smith site laboratory facility on a daily basis. In summary: All samples are sorted on arrival at the laboratory and checked against the accompanying documentation, weighed and the sample numbers entered into LIMS (Laboratory Information Management System). Granny Smith is notified of any discrepancies prior to sample preparation commencing. Bar-coded sample labels and work sheets are used to control the workflow through the sample preparation and analytical phases. Samples are dealt with sequentially as per the instructions from Granny Smith. The samples within their calico bags are placed in a drying oven and dried at 105 ºC in a modern forced air oven. Where required (drill core), the dry samples are jaw crushed to -15 mm and then to 90 % passing 3 mm. If over 3 kg, the sample is split using a stainless steel riffle splitter or a rotary splitter as per the instructions. A 3 kg split is taken and pulverised to 90 % passing 75 µm in a LM5 pulveriser. A 250-300 g scoop of the pulverised sample is placed in a labelled paper sample bag for analysis and the remainder of the pulp placed in the original calico sample bag and returned to Granny Smith for cataloguing and storage. ALS is an independent testing, inspection, certification and verification company headquartered in Brisbane, Australia, with the laboratories which are used by Granny Smith located in Kalgoorlie and Malaga, Perth ( Table 8.1.1). Table 8.1.1: Analytical laboratory accreditation Laboratory Certificate number Accreditation number Independent testing inspection ALS Kalgoorlie QEC27912, C-90494 (ISO 9001:2015) SAI Global ISO 9001:2015 ALS Perth 825, 23001 (ISO/IEC 17025) Accredited NATA (National Association of Testing Authorities, Australia) ISO/IEC 17025 Source: Granny Smith CPR, 2021 A summary of the ALS sample preparation process is provided in Figure 8.1.1. A summary of the sample preparation process for grade control and face samples at the Granny Smith site laboratory is provided in Figure 8.1.2. P a g e 47 | 136 Figure 8.1.1: Sample preparation and analytical flow sheet for ALS Laboratory Source: Granny Smith CPR, 2021 P a g e 48 | 136 Figure 8.1.2: Sample preparation and analytical flow sheet for Granny Smith Laboratory Source: Granny Smith CPR, 2021 The Qualified person has reviewed the sample preparation and security procedures. The sample preparation is found to be adequate with effective supervision and in line with industry leading standards. No material bias is indicated that could potentially impact the sampling preparation and analysis. Sample security enforcement is reliable with low consequence if in the unlikely event of security protocols failure.
P a g e 49 | 136 8.2 Sample analysis At the two ALS laboratories Granny Smith typically assays for gold using the 50 g fire assay method (FA50) with an atomic absorption spectrometry (AAS) finish to a 0.01 g/t Au detection limit. Samples above 60 g/t Au are re-assayed using a gravimetric finish to improve assay accuracy. At Granny Smith site laboratory Granny Smith assays for gold using the 25 g fire assay method (FA25) with an atomic absorption spectrometry (AAS) finish to a 0.01 g/t Au detection limit. All laboratories processing Granny Smith samples are required to have separate preparation and analysis circuits for grade control and exploration samples (i.e. those with potential low level gold) so as to minimise cross contamination. The sample analysis flowsheets for the ALS laboratories and the Granny Smith site laboratory are shown in Figure 8.1.1 and Figure 8.1.2 respectively. The Qualified person has reviewed the certificates and is of the opinion that the analytical laboratories are certificated and have effective process and protocol in place to ensure quality control and assurance and minimise any material errors. 8.3 Quality control and quality assurance (QA/QC) QA/QC is an integral aspect of the entire sampling and assaying procedure. It allows measurement of the reliability of the collected data as well as accuracy and precision ensuring that best practice is followed throughout the drilling, sampling, preparation and analytical processes. To monitor QA/QC, Granny Smith has implemented a comprehensive “Best Practice” quality control system, comprising of written procedures and monitoring by the mine and exploration geology groups and resource geology group together with internal and external audits. On receipt, each laboratory batch is analysed to determine accuracy, precision and repeatability of each assay. All assay results are received directly from the laboratory in a digital format and automatically loaded into the database using scheduled automated database tasks. On loading, the assay results are subjected to an automated assay pass/fail process where the QA/QC samples are evaluated and either passed or failed. Assays results outside a standard set of control guidelines are flagged automatically and a warning notification is sent to the responsible geologist. If a batch fails, it is quarantined in the database until the geologist concerned has examined the data and determined the course of action required in conjunction with the QA/QC requirements. Results are collated and reported monthly. Data analysed includes standard and blank performance, and monthly summaries are presented to the geology staff within the monthly report. QC samples are submitted within assay batches allowing the monitoring of drilling, sampling, laboratory sample preparation techniques as well as analytical accuracy and precision. All QC data is stored in the database. All original data is preserved in the database as originally loaded and follow-up actions such as re-assays are recorded in the pass/fail extension. QC sample types are summarised in Table 8.3.1. P a g e 50 | 136 Table 8.3.1: Quality control type summary Sample description QC stage Comments Field duplicate Monitors sample source and sampling procedure Duplicate sample taken identically as the original sample (1/2 core; RC: duplicate split taken in field) Laboratory duplicate Preparation Repeats taken by ALS to monitor the laboratory process Crush duplicate Preparation after jaw crush, but before pulverised Implemented October 2013 to ensure that whole diamond core samples can get a representative duplicate Standard/blank Analytical Certified sample of known concentration: pulps (standards), coarse crushed matrix-matched basalt (blank) Pulp duplicate Analytical Repeated re-assay on the analytical pulp as requested by the QA/QC geologist from a QC failure or as a lab check Pulp umpire Analytical (at the end of a program) Random subset of pulps sent to an umpire laboratory to ensure analytical accuracy and precision Source: Granny Smith CPR, 2021 The following procedures are stipulated by Granny Smith: Sample pulverisers are cleaned mechanically and/or with a vacuum. Bowls must be clean before inserting a new sample in the bowl. Quartz, feldspar or blue metal washes are utilised to ensure no carry-over contamination between individual jobs and after every rack. Washes are required between samples when any amount of the previous sample adheres to the bowl or puck. Samples of wash materials are retained for analysis as noted on the sample submission sheet. Crushing equipment is cleaned with barren material before and after each sample batch. Bowls are vacuumed between each sample. Wet screening of sample pulps on a 1:40 basis to ensure >90 % passes 75 μm with the results reported each batch. Screening of crushed material on a 1:40 basis to ensure that >90 % passes a 3 mm with the results reported each batch. The target grind size is 90 % passing 75 μm for samples pulverised for six minutes with 1 in 50 samples sized. If the required grind size is not achieved, grind compliance is considered to have failed. Protocols for failed grind sizes include investigations for the cause, notifying the laboratory of the problem and re-milling and re-assaying of the mineralised intersection. Granny Smith also monitors and measures laboratory QA/QC compliance and performance at regular intervals and against each batch submitted to the laboratory. This entails the measurement of contamination in preparation, and the quality of crushing, milling, fire assay and analysis of solutions. All monitoring is completed by batch after the assay results are reported and each batch must pass Gold Fields’ QA/QC criteria before being accepted. Granny Smith reports on QA/QC compliance monthly. Accuracy is monitored by using different certified standards corresponding with expected grades of the batch. Commercial certified standards (or CRM) are used and inserted at a minimum rate of 1 in 20. If the standard returns a value outside 3 times the certified standard deviation for that standard, then the standard will fail the QA/QC protocols. Field duplicates are used for reverse circulation drilling. Contamination is monitored by using coarse blank material (20 mm rainbow quartz) sourced from Teak Industrial Supplies are inserted at a minimum rate of 1 in 40 before and/or after medium to high-grade intersections based on alteration intensity. Quartz flushes are also requested for samples within zones of strong alteration or visible gold. If a blank contains more than 20 ppb Au, the blank is considered to have failed. If the failure is caused by an analytical or process problem, the laboratory is notified, and a re-assay is carried out. If the blank pulp returns anomalous gold P a g e 51 | 136 and if the failure is caused by contamination, the laboratory is notified and dependent upon the cause and the extent of the effect, the samples are re-split, re-submitted and re-assayed. Precision is monitored using crush duplicates, pulp duplicates and laboratory duplicates. A minimum of 5 % precision duplicates are inserted. If the duplicates fail MAPD (Mean Average Percentage Difference – from GFA-RSG-PR005 “QAQC Procedure Gold Fields Australia”) tolerances, then the duplicate is considered to have failed. The protocol for failed duplicates is to investigate for possible reasonable causes such as a nugget effect, sampling error, poor recovery or wet sampling. Granny Smith will then determine the course of action. The following sample fire assay analytical procedures are required by Granny Smith: Minimising samples lost during flux mixing to an agreed level. Pot racks to be kept clean to make easily visible lead lost after pouring. Fires spotted on regular basis and all furnace control sheets to be made available for view upon Granny Smith’s request. Re-assay of any samples with loss of sample in mixing, boil over in the furnace, lost lead in pouring, lost lead in slag, lead in pot racks or signs of unfused sample. Batches not in accordance with the laboratory QA/QC requirements must be re-assayed and each occurrence reported to Granny Smith within the normal reporting parameters for each batch and in the monthly QA/QC report. Umpire assays on pulps are completed at Genalysis Perth following the same assaying protocols as ALS. Samples are selected at random using an automated script within acQuire® to approximate equal proportions of samples are submitted (0.3-1.0 g/t Au, 1.0-3.0 g/t Au, 3.0-10.0 g/t Au and >10.0 g/t Au). A standard is inserted at a rate of 2.5 % for this QA/QC protocol. Granny Smith representatives also conduct regular laboratory audits in keeping with industry best practice (Table 8.3.2 and Table 8.3.3). During 2020, monthly laboratory inspections and in-depth quarterly audits were carried out at ALS Perth, ALS Kalgoorlie and the Granny Smith site laboratory. Issues are dealt with when identified. Table 8.3.2: Recent reviews of Australian Laboratory Services (ALS) Kalgoorlie laboratory Date Auditor Conclusions 24/02/2021 L. Smuts Large sample volumes, GFA volumes honoured as per contract, LM5 lid replacement program completed. ME/ASD sample TAT in Kal, Au priority to ensure ME/ASD within 21 days. New acting lab manager Brenen Christie under Greg Brosnan supervision. Face sample TAT priority remain important to GFA, also sample volumes to honour GFA contract volumes. 09/06/2021 L. Smuts James Egan, Claudia, Jesse Osborne, Thomas, Darren Murray and Andrew, Lab process review and training completed for sites. CRM performance, increased failures due to an operator not following procedure. TAT starting to blow out, Kal ALS struggle with sample throughput due to staff shortages. 06/09/2021 L. Smuts TAT blow outs for GFA due to staff shortages, weekly meetings implemented, Perth ALS loadshedding assisting TAT backlogs. Pb button slag separation observed, Boilovers, LM2 lid seals issue, 23/11/2021 L. Smuts Orbis internal cleaning improvements being reviewed, all Q3 audit issues was resolved except for ongoing testwork being completed in Perth ALS reviewing PB slag separation if it contain gold, as well as the wet lab temperature effects on gold results. Source: Granny Smith CPR, 2021 P a g e 52 | 136 Table 8.3.3: Recent reviews of Australian Laboratory Services (ALS) Perth laboratory Date Auditor Conclusions 09/02/2021 L. Smuts / Samuel George / Kab Karuna / Kyle Wohlers Commissioning new Robotic cell, New Orbis fine crushers being tested. Low sample volumes. Big focus on staff training, maintenance, fixings, housekeeping undertaken. 21/05/2021 Gail Clark COVID measures, AGM DD samples all in Perth, limited to 2,500 full core and 1,500 half core only, rest to go to Kal ALS, Gruyere GC RC program, QAQC data review, ALS Round robin with GFA CRMs compared, reflect differences to Geostats Round Robins. 05/09/2021 L Smuts Gold Field’s flush insertion methods reviewed, Gold Field’s insert on paperwork rather than lab. Orbis internal cleaning mechanism implemented as a test environment, automated internal air jets cleaning rather than manual operator based. 03/12/2021 L Smuts Lab capacity expansion ongoing, LM5 mill cleaning prctices improvements, sample TAT backlog resolution plan reviewed and sample priority weekly meeting implemented. Ongoing testwork related to PB slag seperation if it contain gold, as well as the wet lab temperature effects on gold results. Source: Granny Smith CPR, 2021 No systematic long term sample biases have been identified from the QA/QC program. The QA program for the drilling carried out at Granny Smith demonstrates sufficient accuracy and precision for use in the estimation of the Mineral resources.
P a g e 53 | 136 9 Data verification The execution of the mine and regional exploration programs were completed to industry best practice and are aligned with numerous standards and procedures developed by Granny Smith and Gold Fields over many years. The process consists of procedures, audits and sign-off documents for all key elements that input into the generation of a Mineral resource model to ensure full compliance. The key components of the geological data acquisition framework include: Validity – Controls to ensure the validity of key activities. Accuracy – Controls to establish the accuracy of data inputs and outputs. Completeness – Controls to ensure the completeness of the process followed. Timing – Preventative and detective controls to identify potential risk and deviation of quality. Segregation of duties/Sign-off – Key members of the senior team are responsible for different aspects of the process. The Qualified person's opinion on the adequacy of the data for the purposes used in the technical report summary The Qualified person is of the opinion that the data verification process and protocols are adequate to minimise any material errors, are in line with industry leading standards and underpin technical assurance 9.1 Data management Sample data is electronically captured in the field via acQuire® software. The acQuire® relational database system is used to store all drilling physicals, survey data, assay data and QA/QC checks. All geological data is entered into acQuire® data logger software through the use of laptops. The acQuire® database import forms have built-in validation checks. Further cross validation of the data is undertaken following export from acQuire® and import into Datamine ® . The acQuire® database contains a register of the sample numbers for primary samples, blanks, and standards. All assay results for the primary samples, standards, and blanks are returned to site via email in a SIF file format and automatically imported into the database. Confirmation is required that all data imported into the acQuire® database was validated by the geologists. Confirmation is also required that validation of all data had occurred prior to it being imported into the final acQuire® tables. Only results accepted automatically or by the geologist are used in Mineral resource estimation. Any primary results that failed the QA/QC standards are rejected, re-assayed and re-imported for the geologists to approve. Once collected and entered into the drillhole database, data elements are validated by the relevant data owner. Sample data is also externally audited by independent audit firms. Drill core is photographed which is digitally stored prior to sampling. Daily server backups of the acQuire® database are completed. Prior to Gold Fields purchase of Granny Smith in 2013, all geological and drilling data was acquired by Placer Pacific and Barrick Gold. Limited data is used from non-Granny Smith sources. Where this data is used it is acknowledged and identified in the appropriate reports. Standard practice is to convert such data to Granny Smith standards and import it into the database upon validation and checks. The Qualified person’s opinion of the data management is: a) The data management process and protocols are adequate to minimise any material errors. b) Regular validation of the database and data management process is aligned with standard industry practices, verified to GFA SOX measure quarterly as a minimum. P a g e 54 | 136 9.2 Plant Sampling Daily composite samples of process plant feed and tailings streams are taken to assist with on-site gold accounting and reconciliation. These samples are collected using a combination of automatic sampling stations as well as manual cuts using appropriately designed samplers. The analysis of the samples used for accounting purposes is conducted by ALS at its Kalgoorlie laboratory. Solid sample composites are analysed using fire assay with an AAS finish. Carbon sample composites are analysed using high temperature ashing, acid digest and an AAS finish. Solution sample composites are analysed using DIBK extraction and an AAS finish. All laboratory assaying procedures are aligned with standard industry practices. In accordance with Gold Fields Plant Metal Accounting Standard, a gold in circuit survey is undertaken monthly to reconcile (by mass balance) the back-calculated gold grade of the mill feed with the mill feed grade estimates obtained using plant samples and assays. The monthly variance between the assayed grade and the back-calculated grade is monitored, and an investigation is required to be carried out if this variance exceeds the minimum allowable levels outlined in the Gold Fields Plant Metal Accounting Standard. 9.3 Drilling In general, data collected includes detailed logging of all borehole chips and core on a detailed basis to extract maximum data and value from available information. The logging may be as broad spaced as composite one metre chips for Reverse Circulation (RC) percussion drilling to centimetre scale of small detail structure and alteration in diamond core. In most cases routine data collected includes lithology, structure, stratigraphy, mineralisation, alteration, geophysical (magnetic properties) and geochemical properties (multi-element assays) and physical measurements (rock hardness, geotechnical RQD's, density, acid rock drainage (ARD). Core recovery is measured for diamond core, while sample weights are measured for percussion methods to estimate sample recovery. Historical diamond drill half- core and percussion sample chip tray are stored to allow review of historical holes. Within the Wallaby deposit, twinning historical holes can be used during infill phases where spatial confidence of the historical drillholes is low. The Qualified person is of the opinion that the drilling protocols described in this report are adequate to minimise material errors and provide the necessary technical assurance. 9.4 Sampling Diamond drilling: where samples are required, core is cut into half core (exploration samples mostly). Where the core is not required to be cut, whole core samples are taken (underground definition and grade control). RC drilling: the sample is collected and passed through a cyclone; the whole sample is presented to the splitter attached to the cyclone and sample collected. Most samples are dry on collection, where wet samples are collected this information is recorded and preserved in the database against that interval as this may impact sample recovery. AC drilling: the sample is collected straight into a bucket / bag through a cyclone; 1/2 m composites are sampled. In paleochannel 1 m composites are collected and whole sample is collected and sent to the lab. The lab homogenises and split by the fractional scooping method the sample to 3 kg and analyses for gold. A field duplicate is collected for these samples by splitting a coarse reject at the lab. AC drilling is not used in Mineral resource estimates at Granny Smith. The Qualified person is of the opinion that the sampling protocols are adequate to minimise material errors and the analytical procedures reflect industry standard practice or better and are appropriate for resource estimation. 9.5 Survey All recent drillholes have been surveyed down the hole by single shot downhole camera and non-magnetic, multi-shot gyro survey at the completion of each hole. Downhole surveys are routinely undertaken by the drilling contractor and verified within the Imdex Hub by a geologist before importing the data into the acQuire© database. The Qualified person is of the opinion that the survey protocols are adequate to minimise material errors. P a g e 55 | 136 9.6 Sample analysis Gold Fields monitors and measures the Laboratory QA/QC compliance and performance at regular intervals and against each batch submitted to the laboratory. This entails the measurement of contamination in preparation, quality of crushing and milling, fire assay circuit and analysis of solutions. All monitoring is completed batch-by-batch after the assays are reported and each batch must pass Gold Fields’ QA/QC criteria before being accepted by Gold Fields. Gold Fields reports on the QA/QC compliance on a monthly basis. Accuracy is monitored by using different certified standards corresponding with expected grades of the batch. Commercial certified standards are used, inserted at a minimum rate of one in 20. Contamination is monitored by using coarse blank material. Blank material is sourced from Rowe Scientific Pty Ltd and consists of 20 mm coarse feldspar. Blanks inserted at a minimum rate of one in 40 before and/or after medium to high-grade ore intersections based on alteration intensity. Quartz flushes are also requested for samples within zones of strong alteration or visible gold. Precision is monitored using crush duplicates, pulp duplicates and laboratory duplicates. A minimum total of 5 % precision duplicates are undertaken. Compliance criteria - Standards If the standard returns a value outside 3 times the certified standard deviation for that standard, then the standard will fail Gold Fields QA/QC protocols. Compliance criteria - Blanks If a blank contains more than 20 ppb for the AA25 method (0.2 g/t) for Au, the blank is considered to have failed. Consideration can be given if the blank assay value is within 1 % of the proceeding sample’s assay value. Gold Fields protocol for failed blanks is as per the following: a) If the grade of the blank is higher than 20 ppb Au and should the failure be caused by an analytical or process problem, the laboratory will be notified and required to re-assay; or b) If the blank pulp returns with anomalous Au results and if the failure is caused by contamination, the laboratory will be notified and dependent upon the cause and the extent of the effect, the samples may be re-split, re-submitted and re-assayed. Compliance criteria – Duplicate If duplicates fail MAPD tolerances, then the duplicate is considered to have failed. Gold Fields protocol for failed duplicates is to investigate for possible reasonable causes such as: a) true in situ nugget effect b) sampling error; and c) poor recovery or wet sampling. Gold Fields will then determine its own course of action. Compliance criteria - Grind sizes Target compliance is 90 % of sized samples passing 75 μm. If the required grind sizes are not achieved, grind compliances are considered to have failed. It should be noted that the samples are to be pulverised for six minutes with one in 20 samples being sized. If the grind size fails, then the SOP will need to be revised after consultation with Gold Fields. Gold Fields protocol for failed grind sizes is as follows: a) Investigate for reasonable cause. b) Notify laboratory of the problem; and P a g e 56 | 136 c) If failed grind sizes coincide with a mineralised section and assay results shows variability caused by heterogeneity of pulps then the laboratory shall re-mill and re-assay the mineralised intersection. Fire Assay - Process a) Samples lost during flux mixing shall be minimised to an agreed level. b) Pot racks are to be kept clean to make easily visible lead lost after pouring. c) Fires shall be spotted on regular basis and all furnace control sheets will be available to view upon Gold Field’s request. d) Any samples with loss of sample in mixing, boil over in furnace, lost lead in pouring, lost lead in slag, lead in pot racks or signs of unfused sample shall be re-assayed. The Qualified person is of the opinion that the sample analysis protocols are adequate to minimise material errors. 9.6.1 Metallurgical Tests Metallurgical testing of all new projects is completed as part of routine exploration operations. Selected core and chip samples are provided by the relevant geologists for separate analysis. Samples are aimed at providing a broad and representative set of samples to reflect differing domains and geology to determine future metallurgical impacts and options. 9.7 Quality Control/Quality Assurance Process Sample registers are used to record sample recovery, as well as sample type. The data, once loaded into the database along with their assay results, can then be manipulated to make comparisons between the data e.g., QQ plots and comparisons of bias between drilling techniques, these can then be recorded in resource reports. Geologists define sampling intervals within drillholes in accordance to sampling protocols set out by Granny Smith. RC and AC samples are taken whilst drilling by the rig off-sider then collected by field technicians. Diamond core samples are typically marked out by the geologist, cut by automated cutting saws if needed, and then sampled by field staff at the core farm. Lengths of these samples on average can vary between 0.3 m and 1.2 m. Whilst sampling the diamond core preservation of the bottom of hole orientation mark must be ensured. Quality Assurance and Quality Control is an integral aspect of the entire sampling and assaying procedure. It allows measurement of the reliability of the collected data as well as accuracy and precision ensuring that best practice is followed throughout the drilling, sampling, preparation and analytical processes. To monitor QA/QC, Gold Fields Granny Smith has implemented a comprehensive “Best Practice” quality control (QC) system, comprising of written procedures and monitoring by the mine and exploration geology groups and resource geology group together with internal and external audits. On receipt, each Laboratory batch is analysed to determine accuracy, precision and repeatability of each assay. All assay results are received directly from the Laboratory in a digital format then automatically loaded into the database using scheduled automated database tasks. On loading, the assay results are subjected to an automated assay pass/fail process where the QA/QC samples are evaluated and either passed or failed. Assays results outside a standard set of control guidelines are flagged automatically and warning notification is sent to the responsible geologist. If a batch fails it is quarantined in the database until the geologist concerned has examined the data and determined any course of action that may be required in conjunction with the QA/QC requirements. Results are collated and reported monthly. Data analysed includes standard and blank performance, and monthly summaries are presented to the geology staff within the monthly report. Quality control samples are submitted within batches allowing monitoring of the drilling, sampling, laboratory sample preparation techniques as well as analytical accuracy and precision. All QC data is stored in the database
P a g e 57 | 136 All original data is preserved in the database as originally loaded and follow-up actions such as re-assays are recorded in the pass/fail extension. No systematic long term sample biases have been identified from the QA/QC program. The quality assurance program for the drilling carried out at Granny Smith demonstrates sufficient accuracy and precision for use in estimating of the Mineral resource. Table 9.7.1: Quality Control type summary Sample Description QC Stage Comments Original Original sample Field Duplicate Monitors sample source and sampling procedure Duplicate sample taken identically as the original sample (1/2 core; RC: duplicate split taken in field) Lab Duplicate Preparation Repeats taken by ALS to monitor the laboratory process Crush Duplicate Preparation after jaw crush, but before pulverised Implemented October 2013 to ensure that whole diamond core samples can get a representative duplicate Standard/Blank Analytical Certified sample of known concentration: pulps (standards), coarse crushed matrix-matched basalt (blank) Pulp Duplicate Analytical Repeated re-assay on the analytical pulp as requested by the QA/QC geologist from a QC failure or as a lab check Pulp Umpire Analytical (at the end of a program) Random subset of pulps sent to an umpire laboratory to ensure analytical accuracy and precision Source: Granny Smith CPR, 2021 9.7.1 Umpire sampling Umpire assays on pulps are completed by Intertek Genalysis (Perth), following the same assaying protocols as ALS. Samples are selected at random using an automated script within acQuire© to approximate equal proportions of samples are <1 g/t, 1-7 g/t, and >7 g/t submitted. A standard is inserted at a rate of 2.5 % for this QAQC protocol. 9.8 Bulk Density Density testing is undertaken on-site by core yard technicians using Archimedes principle (water immersion method). Densities are calculated using the below formula. 𝐷𝑒𝑛𝑠𝑖𝑡𝑦 = 𝑚𝑎𝑠𝑠 (𝑑𝑟𝑦)/(𝑚𝑎𝑠𝑠 (𝑑𝑟𝑦) − 𝑚𝑎𝑠𝑠( 𝑖𝑛 𝑤𝑎𝑡𝑒𝑟)) A tabulation of the densities applied is provided in Table 7.5.1, Table 7.5.2 and Table 7.5.3 in Section 7.2.2. The Qualified person’s opinion of the density work is: a) The bulk density testing is adequate for the intended purpose and the tonnage estimation based on the bulk densities appear to have little bias Bulk densities are consistent with lithology and ore types estimated over a ±25 year mining history 9.9 Geological modelling All data acquired is based on current detailed knowledge and intellectual models derived over many years of exploration and mining at Granny Smith. Corporate consultants and industry experts routinely visit site to review the best practices and guide, align the current staff with new innovative methods, ideas and concepts to facilitate continued excellence in exploration, mining and resource estimation. In addition, internal and external training of new and existing staff to appropriate methods, techniques together with management oversight ensures on-going best practices. The geological interpretation has potential to materially impact on the estimated quantity and quality of the Mineral resource and Mineral reserve. Incorrect assumptions regarding volume and geological and/or grade continuity has the P a g e 58 | 136 potential to overestimate contained metal. However, support from expert geologists, site and corporate peer reviews, external reviews, and the Model Handover Report (MHR) and Model Sign-Off Form processes ensure that the geological interpretation is one that most geologists would independently arrive at. A series of standard model validations are carried out during and after completion of the grade estimation including: Visual validation checks. Wireframe vs. block model volume checks. Comparison of different estimation methods (SK vs OK). Comparison of composite vs block model statistics. Comparison of composite vs block model swath plots. Global change of support. Analyses of quality of estimates (including slope of regression and kriging efficiency). Granny Smith has an extensive and proactive grade control and reconciliation process to review operational planning against actual performance. This encompasses model performance, dilution, mining mix and grade distributions and are comprehensively tracked and managed through the site database. Periodic reports and reviews are completed as part of monthly and quarterly reviews, as well as tracking of the Mine Call Factor and ore sources. Current 2021 reconciliation results indicate no adverse impacts or risks associated with the resource models. The Qualified person’s opinion of the geological modelling is: a) The geological modeling protocols are adequate to minimise material errors b) The controls have been reviewed and the adequacy is reasonable and that material bias or errors are unexpected c) The systems to reduce human and procedural errors, checks and balances are adequate and minimise material errors d) The protocols are adequate as reviewed and that the Mineral resource models are based on sound data and are reasonable P a g e 59 | 136 10 Mineral processing and metallurgical testing 10.1 Testing and procedures 10.1.1 Background The Granny Smith operation and reserves comprises the Wallaby underground mine. The Wallaby deposit was discovered in 1998, first open pit ore was mined in 2001 and underground operations commenced in December 2005. Within the Wallaby underground deposit, the gold lodes form a series of stacked zones that are sub-horizontal to gently northeast dipping (see Figure 6.2.4). A series of east-west striking vertical lodes is also present as linking structures between the main horizontal lodes. The main gold mineralising event is associated with dolomite-albite alteration. Sulphidation appears to be the main gold deposition mechanism. Lower grade areas are associated with carbonate-biotite and early-stage hematite alteration. Gold occurs along micro-fractures within pyrite and generally ranges from 1 μm – 20 μm in size. It also occurs as larger (up to several millimetres) grains within quartz veining, either in strongly dolomite-albite altered rocks or in small veins within a few metres of an ore zone. Coarse visible gold is also observed in narrow (<5 mm) moderate to steeply dipping quartz-carbonate veins. End-2021 reserves consists of ores associated with Wallaby underground zones, in decreasing order of contained gold; Z110-120, Z135, Z100 and Joey/Z250/60. Additional minor remnant mining reserves also occur in the upper-level zones; Z60 through to Z90. 10.1.2 Metallurgical sampling & testing Metallurgical testing of all new projects is completed as part of routine exploration operations. Selected drill core and chip samples are provided by the relevant geologists upon definition of discrete geological domains for separate analysis. Samples are composited from drill intersections to obtain a representative sample mass to reflect differing domains to determine future metallurgical impacts and options. The samples are dispatched to a third-party laboratory for metallurgical testing. Many factors which can significantly impact on processing capability include the physical properties of the orebody (ore hardness, abrasiveness and breakage characteristics), liberation properties (grind/recovery sensitivity, gold- mineral associations, gravity recoverable gold content), metallurgical properties (oxidant sensitivity, leach rate profile, leach accelerant amenability) and the presence of other minerals or species that can contribute to additional reagent consumption or become a contaminating presence in the tailings stream. It is the aim of the metallurgical testing program to identify these factors and attempt to quantify their effects. Testwork on the physical and liberation properties of deposits are conducted on the samples to develop orebody domain definition. This testwork is utilised to review whether existing Granny Smith processing capabilities are suited to process the required ore from these deposits. This is backed up by ongoing review and reconciliation work by the on- site process team who actively track and monitor metallurgical efficiency as part of standard operating practices. All Mineral resources and reserves are analysed in regard to existing plant capacity, infrastructure, processes and personnel. Existing metallurgical infrastructure is planned to process all current and future Mineral resources and reserves mined within the Property. Granny Smith follows a standard testwork protocol designed to reflect the unit operations present in the current plant infrastructure This analysis includes: Comprehensive assessment of process mineralogy including head assays, elemental sweep and X-ray diffraction (XRD) analysis. Examination for deleterious material including acid mine drainage analysis. P a g e 60 | 136 Comminution characteristics including crusher indices, abrasion indices, and grinding indices for semi-autogenous grinding (SAG) and ball milling. Extraction sensitivities in time profiled laboratory gravity and leach testwork programs to determine overall recovery. Subsequent diagnostic analysis of tailings residue if warranted. Impacts on expected reagent consumption, specifically cyanide and lime. Metallurgical testwork programs are ongoing at Granny Smith, based upon the progressive drilling and definition of new or existing mining area extensions that are associated with the exploration program. Metallurgical testwork programs that were completed during 2020 as drilling and ore definition of deposits advanced and progressive studies were completed included: Wallaby Zone 120 - 135 Vertical & Horizontal Wallaby Zone 250 - 60 Joey The characteristics of the ore sources are typically sufficiently different such that where appropriate, a fixed or grade recovery per ore source is assigned. For ore sources that are currently or have been historically treated then an overall grade recovery relationship based on known processing plant performance is assigned. The Granny Smith process plant currently sources feed from the Wallaby underground mining operation. Daily composite samples of processing plant feed and tailings streams are taken to assist in gold accounting on site. These are collected using a combination of automatic sampling stations as well as manual cuts using properly designed samplers. Analysis of the composites includes gold contained in solids, solution and carbon. The analysis of samples used for accounting purposes is conducted by the Granny Smith site laboratory. The laboratory facilities include sample preparation, fire assay and a wet analysis area. Solid sample composites are analysed using fire assay with an AAS finish. Carbon sample composites are assayed using high temperature ashing, acid digest and an AAS finish. Solution sample composites are assayed using DIBK extraction and an AAS finish. All laboratory assaying procedures are aligned with standard industry practices. On a weekly and monthly basis, gold in circuit surveys are conducted to reconcile gold recovery and feed grades against assayed estimates. Bullion samples are taken when required by vacuum sampling from each gold pour. These samples are used as an estimate prior to receiving official outturn assays provided by the Perth Mint. 10.2 Relevant results 10.2.1 Sample Head Analysis
P a g e 61 | 136 Table 10.2.1 shows a summary of the average sample head analyses grouped by Wallaby zone. The samples are reasonably and consistently enriched in sulphide sulphur, carbonates, calcium (Ca) and Magnesium (Mg). The samples beneficially contain relatively low concentrations of organic carbon, copper (Cu), lead (Pb), arsenic (As), mercury (Hg), tellurium (Te) and antimony (Sb). There appears to be no significant variation in multi-element species concentrations between the different geological zones. P a g e 62 | 136 Table 10.2.1: Summary of Wallaby zone average sample head analysis Analyte Units Zone 80 (Avg) Zone 90 (Avg) Zone 100 (Avg) Zone 110 (Avg) Zone 120 (Avg) Zone 135 Vertical (Avg) Zone 135 Horizontal (Avg) Ag ppm 0.60 0.50 0.53 0.53 0.54 0.49 0.97 Al % 6.53 5.99 6.60 6.60 6.03 6.26 5.76 As ppm 116 38 29 29 28 20 22 Ba ppm 248 443 1279 1279 930 1055 822 Be ppm 2.10 1.60 <20 <20 <20 5.00 9.53 Bi ppm 3.00 2.00 <25 <25 <25 10.00 14.53 C total % 3.45 2.84 2.55 2.55 2.69 2.91 2.78 C organic % 0.05 0.05 0.06 0.03 0.03 C carbonate % 8.39 8.39 12.64 14.44 8.01 Ca % 7.22 5.95 5.91 5.91 6.21 6.56 6.32 Cd ppm 20 20 20 5 10 Co ppm 34 30 32 32 34 27 34 Cr ppm 164 134 164 164 150 118 100 Cu ppm 93 87 87 87 87 73 86 Fe % 6.24 5.71 6.77 6.77 5.98 5.45 6.30 Hg ppm 0.30 2.10 0.43 0.43 0.33 0.35 0.32 K % 1.71 1.95 2.46 2.46 2.13 2.58 1.76 Li ppm 78 85 25 25 27 17 23 Mg % 2.24 1.98 1.88 1.88 2.12 1.79 2.03 Mn ppm 1737 1442 1299 1299 1339 1353 1394 Mo ppm 10 12 24 24 28 85 18 Na % 2.99 2.74 3.13 3.13 2.70 2.74 2.67 Ni ppm 105 86 81 81 94 71 90 P ppm 527 699 643 643 927 822 612 Pb ppm 52 36 36 36 24 50 46 S total % 3.44 3.16 2.01 2.01 2.18 2.41 2.67 S sulphide % 2.27 2.87 2.22 2.22 2.48 2.23 2.45 Sb ppm 28.0 28.0 5.9 5.9 5.0 6.2 7.1 SiO2 % 46 52 47 47 44 47 47 Sr ppm 1501 1379 1412 1412 1151 1976 1102 Te ppm 1.1 1.1 1.9 1.8 1.8 Ti ppm 3400 2900 3457 3457 3806 3564 3793 V ppm 198 192 148 148 167 142 154 Y ppm 85 85 37 100 100 Zn ppm 125 106 110 110 94 84 75 Source: Granny Smith CPR, 2021 10.2.2 Metallurgical recovery A summary of the number and results of laboratory recovery tests carried out on samples taken from key selected mining areas is shown in Table 10.2.2. The average grades, tails and recoveries for each mining zone data is also shown for reference. P a g e 63 | 136 Table 10.2.2: Summary of metallurgical samples/tests quantities and summary of average recovery results Wallaby zone No. samples Zone structure direction Calculated head grade Au (g/t) Gravity recovery (%Au) Final tails grade Au (g/t) Overall recovery (%Au) Joey Z250-60 6 Horizontal 7.62 34.75 0.47 93.9 Zone 80 3 Horizontal 6.28 NA 0.86 86.4 Zone 90 15 Horizontal 10.03 NA 1.30 87.0 Zone 100 35 Horizontal 6.50 NA 0.71 89.0 Zone 105 3 Vertical 6.31 46.39 0.37 94.1 Zone 110 5 Horizontal 4.46 32.23 0.50 88.9 Zone 120 11 Horizontal 7.37 36.01 0.61 91.8 Zone 125 3 Vertical 7.53 42.84 0.61 91.9 Zone 135 20 Horizontal 7.62 30.09 0.66 91.4 Zone 135 9 Vertical 9.75 27.53 0.84 91.4 Source: Granny Smith CPR, 2021 The laboratory testwork methodology carried out on the samples from Zones 80, 90 and 100 excluded a gravity recovery stage, since the plant was not equipped with a gravity circuit at the time that the testwork was carried out. Table 10.2.3 summarises metallurgical recoveries for the key ore sources in the Granny Smith Mineral reserve. For the development of the reserve process recovery estimation models for the plant, two separate approaches have been adopted, and described as follows: Grade/recovery estimation model fitted to the 2020 monthly actual plant performance results – a single recovery estimation model is adopted for the surface stockpiles and Wallaby Zones 60, 70, 80, 90, 100, 110 and 120 ore sources, due to the availability of actual processing experience and history treating these blended ore sources. Grade/recovery estimation model fitted to testwork results – adopted for Wallaby Zone 250/Joey and Zone 135 (vertical and horizontal), because these ore sources have not yet been processed through the plant, and therefore the metallurgical testwork results are the only available information concerning recovery of these two mining areas. Table 10.2.3: Summary metallurgical recoveries estimate by ore source (geological zone) Mining area Note Tonnes (kt) Grade (g/t Au) Recovery (%) Recovery estimation model Underground Wallaby Zone 250/Joey 1 479 4.7 93.8 100 x (Grade – (0.0589 × 𝐺𝑟𝑎𝑑𝑒+0.0164) 𝐺𝑟𝑎𝑑𝑒 ) Wallaby Zones 60, 70, 80 & 90 2 459 4.61 92.1 100 x (0.8322 + 0.058 x LN(Grade)) Wallaby Zone 100 2 1,904 5.15 92.7 100 x (0.8322 + 0.058 x LN(Grade)) Wallaby Zone 110 2 910 5.19 92.8 100 x (0.8322 + 0.058 x LN(Grade)) Wallaby Zone 120 2 4,078 5.42 93.0 100 x (0.8322 + 0.058 x LN(Grade)) Wallaby Zone 135 1 4,752 5.52 91.1 100 x (1 − (0.10561 ×𝐺𝑟𝑎𝑑𝑒0.89756) 𝐺𝑟𝑎𝑑𝑒 ) Surface stockpiles 2 31 4.76 92.3 100 x (0.8322 + 0.058 x LN(Grade)) Note: 1. Recovery estimation model developed using testwork results. 2. Recovery estimation model developed using 2020 monthly plant results treating blended ore. Source: Granny Smith CPR, 2021 Due to the added complexity of the Granny Smith treatment plant with the inclusion of a CIP tailings retreatment circuit (spirals and concentrate regrinding), and the significantly larger volumes treated (compared to metallurgical core sample volumes) there is more confidence in using the actual plant results for recovery performance estimation, as compared to the laboratory test results. P a g e 64 | 136 A chart comparing the monthly plant feed grade and recovery results, with the plant recovery estimation model (used for Zones 60 through to 120) is shown in Figure 10.2.1. There is a reasonable degree of variability in the plant results, however the recovery estimation model matches the 2020 plant results reasonably well, since this was the dataset used to develop the model early in 2021. The plant recovery results achieved in 2021 are slightly lower than the recovery estimation model. The recent performance of the Granny Smith process plant is provided in Figure 10.2.1 for comparison. Figure 10.2.1: Granny Smith plant monthly feed grades and recoveries compared to the recovery estimation model used for Z60 to Z120 Source: Granny Smith CPR, 2021 10.2.3 Ore hardness The metallurgical testing program at Granny Smith includes ore hardness testing, typically being the crushing work index, abrasion index (Ai), Bond BWI (ball work index) and SMC (Steve Morrell Consulting) SAG milling parameters. To estimate mill throughput expectations for future ores from the hardness test results, the Morrell Total Power method is used, which provides an estimate of overall grinding circuit power requirement in kWhr/t using the SMC parameters (SAG mill, Mia and Ball mill, Mib) which are calculated from the Bond ball work index (BWI) test and the SMC drop weight index test results. The grouped ore hardness indices and total milling power draw requirement estimates are shown in 91.0% 91.5% 92.0% 92.5% 93.0% 93.5% 94.0% 94.5% 95.0% 95.5% 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 O v er a ll g o ld r ec o v er y (% A u ) Gold Head grade (g/t) Plant monthly 2019 Plant monthly 2020 Plant monthly 2021 2021 Reserves Model
P a g e 65 | 136 Table 10.2.4, for a final grind size of approximately 100 μm, listed in order of increasing estimate of power draw. P a g e 66 | 136 Table 10.2.4: Summary of hardness indices and power requirements estimates for Wallaby underground Wallaby Ore Source Zone Rock SG (t/m³) SAG Index, Mia (kWhr/t) Ball Index, Mib (kWhr/t) Estimated Mill Power Required Motor (kWhr/t) Joey 2.87 23.0 18.1 16.5 Zone 80 2.84 23.0 17.9 16.4 Zone 90 2.82 21.1 16.9 15.3 Zone 100 2.84 24.7 20.0 18.0 Zone 110 2.83 22.3 18.1 16.2 Zone 120 2.83 22.5 18.9 16.7 Zone 135 Vertical 2.79 20.1 15.1 14.1 Zone 135 Horizontal 2.84 19.9 15.1 13.9 Source: Granny Smith CPR, 2021 From an operational perspective, the treatment capacity of the installed processing plant far exceeds the ore mining rate from the Wallaby underground mine. The plant is operated on a calendar monthly campaign basis, running for about two (2) weeks, and then going on stand-by (shut-down) for about two (2) weeks, timing varying based up on the availability and volume of the Wallaby mined ore stockpile. 10.3 Plant Sampling Daily composite samples of processing plant feed and tailings streams are taken to assist in gold accounting on site. These are collected using a combination of automatic sampling stations as well as manual cuts using properly designed samplers. Analysis of the composites includes gold contained in solids, solution, and carbon. The analysis of samples used for accounting purposes is conducted by the Granny Smith site laboratory. The laboratory facilities include sample preparation, fire assay and a wet analysis area. Solid sample composites are analysed using fire assay with an AAS finish. Carbon sample composites are assayed using high temperature ashing, acid digest and an AAS finish. Solution sample composites are assayed using DIBK extraction and an AAS finish. All laboratory assaying procedures are aligned with standard industry practices. Bullion samples are taken when required by vacuum sampling from each gold pour. These samples are used as an estimate prior to receiving official outturn assays provided by the Perth Mint. In accordance with Gold Fields Plant Metal Accounting Standard, a gold in circuit inventory is undertaken monthly to reconcile (by mass balance) the back-calculated gold grade of the mill feed with the mill feed grade estimates obtained using daily plant samples and assays. The monthly variance between the assayed grade and the back-calculated grade is monitored, and an investigation is initiated if this variance exceeds the minimum allowable levels outlined in the Gold Fields Plant Metal Accounting Standard. 10.4 Deleterious Elements The testwork procedures includes analysis for elements that could be deleterious to plant recovery (e.g., arsenic, tellurium, antimony, organic carbon). However, to date no specific deleterious mineral species have been identified that significantly impacts the processing plant. The Granny Smith ore sources are notably enriched in sulphide sulphur; and there is a positive relationship between the Wallaby metallurgical sample’s leach tailings grade and sulphur head grade. However, due to the limited availability of sulphur grade data in the mine’s geological assay database, it is not possible to estimate sulphur grade distribution within the Granny Smith mineralisation areas. P a g e 67 | 136 10.5 Metallurgical Risks In the opinion of the Qualified person, the combination of a well-established processing plant with a known operating history of treating ores mined from the associated mining leases, together with the ongoing and active metallurgical testwork program assessing core samples selected from future local mineralisation areas, provides a reasonable platform for estimating the associated metallurgical and processing modifying factors underpinning the 2021 reserves. However, the reader should be aware that uncertainties remain, and some key potential areas of risk and uncertainty are discussed in the following sections. 10.5.1 Sample Representativity Metallurgical sample selection is an important aspect of the process of developing resources into reserves. The results of the testwork undertaken on those samples are often used directly as input into plant performance estimates that are then used for the life-of-mine and reserve’s financial evaluations. It is important that the metallurgical samples are representatively selected, for example, to cover a suitable range of gold head grades, to consider the different geological lithologies and domains expected to be encountered, and to appropriately incorporate internal and external material dilution expected during the mining process. Individually testing different head grades ranges and geological domains improves the ability to see the metallurgical response variability of the orebody, which improves the ability to make better judgements and estimates about how the material could perform in the processing plant. As new potentially economic mineralised areas are identified at the mine, the site’s exploration geologists and metallurgists will select a few, to several, core composite samples of each new mineralisation area, and submit to a commercial metallurgical laboratory for the undertaking of a defined testwork program including, head assays, recovery, and physical properties analyses. Whilst effort and care are taken with the sample selection process, there are practical constraints to samples numbers due to core availability and testwork cost, and therefore it is not possible for the Qualified person to guarantee that the proposed reserves have been fully representatively sampled, and therefore some inherent uncertainty will remain. 10.5.2 Laboratory Test Methods and Scale-up The laboratory test results require scale-up to estimate performance through the industrial processing facility. The metallurgical testing regime adopted has been specifically tailored to provide results that reasonably and practically represent the actual installed processing facility. This regime has been developed from experience gained over many years of undertaking such work, culminating in eventual mining, and processing of ores that have been historically metallurgically tested. Gravity and leach recoveries achieved in the laboratory are assumed to be achievable within the plant. Overall laboratory recovery results are typically model-fitted to a bounded sample head grade relationship, and this resulting model is assumed to be reasonably achievable at plant scale. Hardness properties are applied to the Morrell Total Power method to estimate grinding mill throughputs. However there remains potential risk associated with the delivery of these metallurgical testing results associated with the differences between laboratory methods and full-scale processes, and miscellaneous and unidentified errors associated with undertaking the testing. The selected laboratory (ALS Metallurgy, Balcatta, Western Australia) that is undertaking the metallurgical testwork is highly regarded within the local gold mining industry, and has an established history of performing well, with both Gold Fields and the Qualified person. No pilot-plant testing is carried out prior to reserve declaration and subsequent mining, and the metallurgical properties are based on bench scale test results only. The sample requirements and cost for pilot testing are considered as being prohibitive. However, with a history of successful operation, and in being consistent with practices adopted for other P a g e 68 | 136 similar operations, it is the opinion of the Qualified person that pilot plant testing is not required for the estimation of plant modifying factors for the 2021 reserves. Despite reasonable efforts and care in the application of scale-up factors and modeling methods, there remains some inherent uncertainty in actual performance of the industrial facility predicted from a small volume of small-scale laboratory tests. One of the key challenges in confirming scale-up is the practice of ore blending of the plant feed (to optimise overall performance of the plant) which can limit regular direct comparison of plant performance and laboratory test results over the longer term. 10.5.3 Deleterious Elements The routine metallurgical testwork program includes detailed head analysis (multi-element ICP-MS scan) to check for quantities of potential deleterious elements to the plant, such as mercury, arsenic, organic carbon, antimony, tellurium, base metals, etc. Whilst this assessment is carried out on the limited number of metallurgical composite samples, it is not typically undertaken on individual exploration or mine geological samples. The multi-elemental assay results obtained from the metallurgical samples are used as a guide to identify if there are any deleterious elements at concentrations that would be of reasonable concern that could materially impact plant performance. If such a species is identified then the option to submit a larger number of individual exploration samples for detailed analysis, to better quantify and locate the deleterious species, is readily available. However, it needs to be recognised that the relatively low number of metallurgical samples initially checked for deleterious elements means that some inherent risk remains of unexpectedly encountering such a species during subsequent mining and processing operations, despite such elements not being identified during metallurgical testing. 10.5.4 End-2021 Reserves recovery estimation model The recovery estimation model used to predict recoveries for ores mined from Zone 60 through to Zone 120, reasonably matches the plant results achieved during 2020, since the recovery model was developed early in 2021 using the 2020 plant results. However, the actual plant performance achieved during 2021 (i.e., after the development of the model) are slightly lower by approximately 0.5 % recovery at a head grade of approximately 5.5 g/t. Due to the study timing associated with the various tasks to develop annual reserves, it is required to update the recovery estimation models early in the calendar year, to provide time for the calculation of cutoff grades and updates to be made to the mine design accordingly.
P a g e 69 | 136 11 Mineral resource estimates The December 2021 Granny Smith Mineral resource estimate is comprised of three areas: Wallaby, Granny Smith and Hillside. The Mineral resources undergo an initial assessment through the application of a range of assumed technical and economic factors to ensure reasonable prospects for economic extraction. All Mineral resource grades and tonnages are diluted and reported in-situ. The in-situ cutoff grade has modifying factors applied. Software used for the data analysis and grade modelling includes: Leapfrog® 2021.1.2 Datamine ® Studio RM v1.3.35.0 Snowden Supervisor® v8.14.0 Geovariance Isatis® v18.04 11.1 Mineral resources estimation criteria 11.1.1 Geological model and interpretation The Wallaby Mineral resource comprises eight models covering the extent of the underground mine and future Mineral reserves. The Granny Smith Mineral resource is a single model that contains the underground Mineral resource areas. The Hillside Mineral resource is a single model covering the open pit resource area. The geological interpretations are based on conceptual models which reflect the current understandings of the controls on mineralisation as discussed in Section 6.2. The conceptual models consider lithology, structural controls, alteration and mineralisation. The understanding of these controls are updated and reviewed as additional information is collected for each deposit. Geological interpretation and modelling are an iterative process that evolves as new data and ideas become available. Generally, only one interpretation and model is submitted for evaluation; however, the interpretation(s) is one that most geologists would independently determine and report. This has been confirmed by ongoing peer, corporate, and external audits and reviews, which have in all cases supported existing methodologies and processes while suggesting a number of minor enhancements. Domain wireframes are created using Leapfrog® software where drillhole interval selections are used to create wireframes using Leapfrog®’s vein modelling or interpolant 3D wireframe modelling functions. Wireframes (depending on the deposit) are created for geological/grade domains, base of oxidation, top of fresh rock, and topography/pits. All models are constrained by geological boundaries and when relevant, by previous open-pit surfaces or underground development wireframes. Internal sub-domains are defined where geological understanding is sufficient. Domaining to define geological zones takes account gold grade and alteration. Cross-cutting dykes and intrusives are accounted for if of sufficient size during the geological interpretation stage. 11.1.2 Compositing DD and RC drillhole data are exported from the Granny Smith acQuire® databases in comma separated text file format (.csv) using queries to restrict the data to the relevant model area. Face sampling data are also used for the Wallaby underground models where grade control had been completed but restricted by polygon to areas immediately surrounding the drives (Table 11.1.1). Cross validation checks, duplicate checks and overlap checks on the data are undertaken following import into Datamine ® . Drillholes are composited at 1 m intervals within the interpreted mineralised zones for all models except the Wallaby Zone 135 model where the drillholes are composited across the full width of the lodes. The 1 m length chosen for compositing matches closely the average sample length. Composites are split at mineralisation domain and lithology boundaries. P a g e 70 | 136 11.1.3 Block modelling The resource models are three-dimensional (3D) block models constrained within 3D domain wireframes. Grade estimates are carried out into block sizes optimised with respect to the nominal drill spacing (parent cells). The parent cells are sub-celled to accurately represent the volume within the domain. The block sizes used for each resource model are listed in Table 11.1.1. Mining depletion is flagged in the resource model and excluded from reported Mineral resource numbers. 11.1.4 Bulk density Bulk densities are assigned by domain as disclosed in Section 7.5. 11.1.5 Top cuts The objective of cutting of high gold assay values is to reduce the influence of high-grade outlier values on the grade estimate. Top cut analyses are conducted on all model domains resulting in updated top-cuts. Top cut statistics for each deposit and each domain/zone are determined using the following methods: Histogram plots. Cumulative log probability plots. Mean and variance plots. Spatial distribution review. 11.1.6 Variography The correlation between sample grades can be seen to increase with decreasing distance between samples and can vary with direction, sample size and the degree of grade continuity. The variogram function attempts to quantify this correlation in 2D or 3D space and determine the search parameters in the grade estimation process. Where appropriate (i.e. for 3D cases), down-the-hole and spherical directional continuity variograms are completed using Snowden Supervisor ® software and used in combination with manually created search ellipses in Datamine ® . Corresponding 2D accumulation and true width variograms also modelled for 2D estimation. Table 11.1.1: Summary of December 2021 Mineral resource estimation parameters Model Maximum Search Min. Max Samples Parent cell size (X, Y, Z) Sub-cell maximum size (X, Y, Z) Estimator Estimate sample type Composite length Top cuts Date Granny Smith 136 m × 105 m × 29 m 6, 30 6 m × 6 m × 6 m 6 m × 6 m × 6 m Simulation DD, RC/DD & RC 1 m 5 g/t-50 g/t July 2020 Hillside 181 m × 66 m × 20 m 6, 48 10 m × 10 m × 5 m 1.25 m × 1.25 m × 0.25 m SK & OK DD, RC/DD & RC 1 m 1.5 g/t-16 g/t September 2017 Wallaby Zone 250/60 135 m × 81 m × 33 m 8, 32 5 m × 5 m × 2 m 2.5 m × 2.5 m ×1 m SK & OK DD, RC/DD & face (grade control areas) 1 m 2 g/t-100 g/t May 2021 Wallaby Zone 70 114 m × 88 m × 40 m 8, 32 5 m × 5 m × 2 m 2.5 m × 2.5 m × 1 m SK & OK DD, RC/DD & face (in grade control areas) 1 m 2 g/t-70 g/t March 2021 Wallaby Zone 80 60 m × 54 m × 22 m 12, 46 5 m × 5 m × 2 m 2.5 m × 2.5 m × 1 m SK & OK DD & face (in grade control areas) 1 m 2 g/t-110 g/t June 2021 Wallaby Zone 90 123 m × 120 m × 22 m 8, 40 5 m × 5 m × 2 m 2.5 m × 2.5 m × 1 m SK & OK DD & face (in grade control areas) 1 m 3 g/t-125 g/t May 2020 Wallaby Zone 100 149 m × 94 m x 31 m 10, 44 5 m × 5 m × 2 m 2.5 m × 2.5 m × 1 m SK & OK DD & face (in grade control areas) 1 m 2 g/t-130 g/t October 2021 Wallaby Zone 110-120 97 m × 87 m × 42 m 8, 38 Variable: 10 m × 10 m × 2 m & 5 m × 5 m × 2 m 2.5 m × 2.5 m × 1 m SK & OK DD & face (in 5 m × 5 m × 2 m grade control areas) 1 m 2 g/t-70 g/t November 2021 Wallaby Zone 135 214 m x 173 m 4, 12 (Seam composite) 10 m × 10 m × seam 1.25 m ×1.25 m × seam 2D GM SK & OK DD Seam width single composite 6 gm-250 gm December 2021 Wallaby Zone 150 164 m x 46 m x 20 m 8, 30 5 m × 5 m × 5 m 1.25 m × 1.25 m × 2 m Localised Conditional Simulation DD 1 m 100 g/t December 2021 Source: Granny Smith CPR, 202: Wallaby Zone 150: Localised to SMUs (5m x 5m x5m) from big parent volumes P a g e 71 | 136 Dynamic anisotropy is a process used whereby the search ellipse is “moulded” to follow undulations within the mineralised domain wireframes. It is a method used to solve the problem of incorrect cross correlation of data points when using a single (variogram or ellipse) defined search ellipse across an undulating domain. This process is effective for the Wallaby deposit due to the undulating nature of the mineralised zones. For the Wallaby Zone 135 model, a 2D flattening approach is used in preference to dynamic anisotropy as a continuous improvement initiative to further reduce the effects of highly undulating domains. The Qualified person’s opinion is that the variograms are a practical reflection of the spatial continuity of the respective mineralization grades and their application to the geostatistical analysis is adequate to minimize uncertainty and to derive appropriate resource block models for use by the planning engineers to complete mine design and production scheduling. 11.1.7 Grade estimation For Granny Smith, conditional simulation (CS) is the main estimation technique used. For Hillside, ordinary kriging (OK) and simple kriging (SK) are the main estimation techniques used. For Wallaby Zones (except Zone 150), ordinary kriging (OK) is the main 3D estimation technique, with SK used in areas of sparse drilling for more efficient estimates. As a result, the OK estimated grade is used in areas of indicated or better classification in all Wallaby models, while the SK estimated grade is used in areas of inferred classification. For Wallaby Zone 150 CS is the main estimation technique used. The grade estimation parameters by resource model are presented in Table 11.1.1. Different domains utilise a combination of hard, soft and semi-soft grade boundaries during estimation. If domains have distinctly different gold distribution characteristics, the estimation reflects this by having hard boundaries between domains. If domains shared similar gold distribution characteristics, they are estimated using a soft grade boundary, which assists to increase the number of samples available for estimation and better reflects the mineralisation. If following boundary analysis, domains have similar gold distribution characteristics near the boundary but different gold characteristics further from the domain boundary, a semi-soft grade boundary is used in the estimation. Grades are estimated into models with optimised parent block sizes determined through the completion of kriging neighbourhood analysis (KNA) to optimise block size kriging efficiency and regression slope values. Parent blocks are sub-celled to increase volumetric accuracy of the domain wireframe. Sub-blocks are set to retain the same grade as the parent block. A multiple pass approach is used for estimation within the mineralised domains. Directional ranges determined from variogram analysis are used to constrain search distances used in estimation as tabulated in Table 11.1.1. The ranges are also used as an aid in resource classification. The first pass uses the optimised search parameters for the domain based on variogram modelling and KNA. Search distances are based on maximum continuity from the variogram. With each subsequent estimation pass, the number of samples is reduced and the search volume (distance) increased. This approach is used to enable most blocks to receive a grade estimate within the domains, with the search pass coded into the model. 11.1.8 Selective mining units The Granny Smith selective mining unit (SMU) size (i.e. the smallest volume of material on which ore and waste classification is determined) in underground operations varies from longhole stoping (4 mH x 20 mL x 25 mW), bulk stoping (50 mH x 20 mL x 25 mW) and development (5 mH x 5 mL x 5 mW). Resource parent block sizes are broadly aligned to the smallest SMU in length and width, while providing greater model selectivity in height. KNA is used to ensure optimal block sizes are chosen for estimation purposes. Mineral resources are constrained within optimised stope solids varying between the minimum and maximum SMUs. 11.1.9 Model validation All data acquired is based on current and historical detailed knowledge and models derived over many years of exploration and mining at Granny Smith. Corporate consultants and industry experts routinely visit site to review the best practices and guide, align the current staff with new innovative methods, ideas and concepts to facilitate continued P a g e 72 | 136 excellence in exploration, mining and resource estimation. In addition, internal and external training of new and existing staff to appropriate methods, techniques together with management oversight ensures on-going best practices. The geological interpretation has potential to materially impact on the estimated quantity and quality of the Mineral resource and Mineral reserve. Incorrect assumptions regarding volume and geological and/or grade continuity has the potential to overestimate contained metal. However, support from expert geologists, site and corporate peer reviews, external reviews, and the Model Handover Report (MHR) and Model Sign-Off Form processes ensure that the geological interpretation is one that most geologists would independently arrive at. A series of standard model validations are carried out during and after completion of the grade estimation including: Visual validation checks. Wireframe vs. block model volume checks. Comparison of different estimation methods (SK vs OK). Comparison of composite vs block model statistics. Comparison of composite vs block model swath plots. Global change of support. Analyses of quality of estimates (including slope of regression and kriging efficiency). Granny Smith has an extensive and proactive grade control and reconciliation process to review operational planning against actual performance. This encompasses model performance, dilution, mining mix and grade distributions and are comprehensively tracked and managed through the site database. Periodic reports and reviews are completed as part of monthly and quarterly reviews, as well as tracking of the Mine Call Factor and ore sources. Current 2021 reconciliation results indicate no adverse impacts or risks associated with the resource models. 11.1.10 Cutoff grades Cutoff grades are influenced by the operating strategy, design and scheduling, and are therefore calculated annually. Open pit The cutoff grades used for the open pit Mineral resources at Hillside are summarised in Table 11.1.2. Table 11.1.2: Open pit resource cutoff grades Open pits Resource cutoff grade (g/t Au) RoM Resource mining recovery (%) Resource mining dilution (%) Hillside 0.66 100 0 Source: Granny Smith CPR, 2021 The open pit resources are constrained to an optimal shell defined by a resource gold price of $1,500/oz and relevant unit costs and modifying factors. Optimisation of the resource pit shell is carried out using Geovia Whittle® software. The cutoff grade is calculated for the material within the pit shell using the following formula: [Ore Premium Mining Costs ($/t) + Process Costs ($/t) + Site G&A Costs ($/t)] [Price x (100 % - Ad valorem Royalty Rate) – All product related costs] x PRF x MCF x 0.03215075 Where: Ore Premium Mining Costs cover adjustments in ore haulage distances and differences in ore and waste drill and blast costs. All other mining costs are accounted for during the pit shell generation phase. Process Costs including sustaining capital.
P a g e 73 | 136 Site G&A Costs including off-site general and administration (G&A) costs directly related to site (e.g. accounting or payroll services). Price is the gold price per ounce ($1,500/oz). The ad valorem Royalty Rate is 2.5 %. All product related costs include management fees, refining costs and contributions to the Gold Fields Foundation per ounce. PRF is the plant recovery factor or metallurgical recovery as a percentage estimated at a grade close to the cutoff grade. MCF is the Mine Call Factor or the percentage of actual mill produced metal against the claim of metal produced. 0.03215075 is the ratio of troy ounces per gram. All material within the pit shell above the calculated cutoff grade is judged to have reasonable prospects for economic extraction. Underground The cutoff grades for the underground Mineral resources at Granny Smith and Wallaby by lode are summarised in Table 11.1.3. The underground Mineral resource estimates are evaluated using the same formula and gold price of $1,500/oz. [Mining Costs ($/t) + Process Costs ($/t) + Site G&A Costs ($/t)] [Price x (100 % - Ad valorem Royalty Rate) – All product related costs] x PRF x MCF x 0.03215075 Where: Mining Costs take account the mining method and area being mined inclusive of secondary development and sustaining capital. The cutoff grade is applied to the deposit model as part of the assessment in relation to minimum mining width and reasonable prospects of extraction. Table 11.1.3: Underground resource cutoff grades Area Resource cutoff grade (g/t Au) RoM Minimum mining width (m) Resource mining recovery (%) Resource mining dilution (%) Resource cutoff grade (g/t Au) MSO¹ Granny Smith underground Granny Smith 1.89 4 mH x 5 mL x 5 mW 90 120 2.27 Wallaby underground Z60_Joey 2.30 4 mH x 5 mL x 5 mW 90 116 2.67 Zone 70/80 2.50 4 mH x 5 mL x 5 mW 90 116 2.90 Zone 90 2.53 4 mH x 5 mL x 5 mW 90 116 2.93 Zone 100 Main 2.67 4 mH x 5 mL x 5 mW 90 116 3.10 Zone 100 Vertical 2.82 4 mH x 5 mL x 5 mW 92 120 3.39 Zone 110 2.90 4 mH x 5 mL x 5 mW 92 116 3.37 Zone 120 2.83 4 mH x 5 mL x 5 mW 92 116 3.29 Zone 135 Main 2.91 4 mH x 5 mL x 5 mW 92 116 3.38 Zone 135 Vertical 3.08 4 mH x 5 mL x 5 mW 92 116 3.57 Note: a) ¹MSO is the mine shape optimiser block for selecting Mineral resource mining shapes. Source: Granny Smith CPR, 2021 P a g e 74 | 136 Minimum mining width and reasonable extraction are assessed using a mineable shape optimiser (MSO) routine available in Datamine Studio RM® software. This routine generates a series of shapes related to a nominated SMU and a minimum width to maintain an average grade within the shape above the nominated cutoff grade. The SMU and minimum mining width are specified in line with current mining practices at Granny Smith. MSO shapes are removed where they are judged too isolated and unlikely to be eventually economically extracted. This leaves a contiguous set of shapes. Small amounts of material below cutoff within the boundaries of the contiguous set of shapes are evaluated to determine if they would be extracted as part of a mining sequence. When close to existing mining areas, a further assessment is made to ensure that material is potentially extractable. Remnant mining areas are coded using a stand-off distance to existing stopes. Mineralisation inside the stand-off zones is not reported as a Mineral resource except where an engineering assessment has resulted in the design and potential extraction of planned stopes. All material within the retained MSO shapes above the calculated cutoff grade is judged to have reasonable prospects for economic extraction and may include some material below the cutoff grade that is extracted as part of the sequence to mine the higher grade (above cutoff) material. Gold Fields conducts an annual review of metal prices for Mineral resource and Mineral reserve reporting to monitor any significant changes that would warrant re-calibrating the price deck for strategic and business planning purposes. This review takes into account prevailing economic, commodity price and exchange rate trends, together with market consensus forecasts and Gold Fields’ strategy and expectations for the mine operations. The resource gold price of $1,500/oz is based on consideration of the following elements and rationale: The 2020/21 gold price volatility, driven mainly by the COVID-19 pandemic and uncertainty related to federal reserve rate cuts, quantitative easing, global geopolitical tensions and fears of global recession, has added some complexity to the 2021 metal price analysis. However, as the pandemic peaks and moves into a ‘controlled and diminishing’ phase, gold prices could pull back and this has been factored into the analysis. The long-term CIBC market consensus forecast of $1,585/oz, and the January 2021 KPMG gold price survey, which involved 25 gold mining companies, indicating a long-term gold price of $1,496/oz, with a low long-term price of $1,350/oz and a high long-term price of $1,600/oz. The 24 month and CIBC MUST be updated as at 31st December as the “final” calibration of metal price ARB. A$ exchange rate of $0.74 which is within 2 % of the CIBC long-term foreign exchange forecast. Ensuring Mineral resources are not too volatile year-on-year with protection against possible downside scenarios if the gold price falls up to ~25 % in a specific year. Ensuring sufficient margin at prices incrementally lower than current spot price ranges and mitigating the risk of inflation. The resource gold price premium to the reserve price is circa 15 % and the differential is in general alignment to Gold Fields’ peer group and industry standard practice. The Mineral resource price premium provides information on each operation’s potential at higher gold prices and indicates possible future site infrastructure and mining footprint requirements. The Qualified person has relied on information provided by the Registrant in preparing its findings and conclusions regarding commodity price and foreign currency exchange rate assumptions. The Qualified person has concluded that reasonable prospects for economic extraction have been demonstrated through the application of an appropriate level of consideration of the potential viability of the Mineral resources. These considerations include a reasoned assessment of the geological, engineering (including mining and processing parameters), metallurgical, legal, infrastructural, environmental, marketing, socio-political and economic assumptions which, in the opinion of the Qualified person, are likely to influence the prospect of economic extraction. P a g e 75 | 136 Although all permitting may not be finalised for some Mineral resources, there is no reason to expect that these permits will not be granted based on existing processes and protocols. 11.1.11 Reasonable prospects of economic extraction The Qualified person has concluded that reasonable prospects for economic extraction has been demonstrated through the application of an appropriate level of consideration of the potential viability of Mineral resources. These considerations include a reasoned assessment of the geological, engineering (including mining and processing parameters), metallurgical, legal, infrastructural, environmental, marketing, socio-political and economic assumptions which, in the opinion of the Qualified person, are likely to influence the prospect of economic extraction. Although all permitting may not be finalised for some Mineral resources, there is no reason to expect that these permits will not be granted based on existing processes and protocols. No mineralisation that does not have demonstrated reasonable prospects for economic extraction has been included in the Mineral resource. 11.1.12 Classification criteria Granny Smith’s in-situ Mineral resources are classified as either measured, indicated or inferred in accordance with the definitions in Subpart 229.1300 of Regulation S-K. Increasing levels of geo-scientific knowledge and confidence are generally based on geological understanding, grade variance, drillhole/sample spacing, mining development (amount of exposed and mapped mineralisation) and mining history. The quality of the estimate is also taken into account and is based on the values and spatial distribution of kriging efficiency and slope of regression calculated during kriging. In general, the following criteria are used as a guide to the Mineral resource classification. Measured Mineral resources: High quality data. Nominal drill spacing less than 25 m × 25 m. Ore development drives with face sampling at <15 m intervals along the lode and grade control drillholes where lode contacts are not visible in the face. Geology, lithological controls, structure and mineralisation well understood. Geological evidence is sufficient to confirm geological and grade continuity between sample points. Updated geology interpretation wireframes include face and drive mapping. Indicated Mineral resources: Good data quality. Data density with nominal drill spacing between 25 m × 25 m and 50 m x 50 m. Geology, structure and mineralisation reasonably well understood. Geological evidence is sufficient to assume geological and grade continuity between sample points supported by the appropriate the drill spacing density. Inferred Mineral resources: Regions of the model that due to data quality issues would otherwise be considered as measured or indicated Data density with nominal drill grid spacing between 50 m × 50 m and 100 m x 100 m. Geology, structure and mineralisation not well understood. Geological evidence is sufficient to imply but not verify geological and grade continuity supported by the appropriate the drill spacing density. Material that does not fit either of the three resource categories is not reported. P a g e 76 | 136 Granny Smith calculates and reports stockpiles when mining occurs and are supported by adequate sampling, surveys and end of month reconciliation and are thus classified as measured Mineral resources. The Qualified person is of the opinion that: a) Inferred Mineral resource has an even chance of converting to indicated Mineral resource with continued exploration, additional empirical data and evolving geoscientific modelling. b) The Mineral resource demonstrates reasonable prospects for economic extraction over the indicated study time frame. c) The Mineral resource gold price of $1,500/oz is at a 15 % premium to the reserve price with the differential being in general alignment with Gold Fields standard practice for setting Mineral resource price. The 15 % premium is to provide information on Granny Smith resource potential at higher gold prices and to indicate possible future site infrastructure, permitting, licencing, SLO, mining footprint and infrastructure requirements. d) The Qualified person’s opinion is that, whilst effort and care are taken with the resource estimation and classification processes, increase in geological knowledge and available data will reduce the level of uncertainty, and therefore some inherent uncertainty will remain.
P a g e 77 | 136 11.2 Mineral resources as of 31 December 2021 The Granny Smith Mineral resources exclusive of Mineral reserves as of 31 December 2021 are summarised in Table 11.2.1. The Mineral resources are 100 % attributable to Gold Fields and are net of production depletion up to 31 December 2021. The point of reference for the Mineral resources is in-situ with dilution applied to the MSO. Table 11.2.1: Granny Smith - summary of gold Mineral resources at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,500/oz Mineral resources (exclusive of Mineral reserves) Cutoff Grades (g/t Au) Metallurgical Recovery (%) Amount/ (kt) Grades/ (g/t Au) Amount/ (koz Au) Underground Mineral resources UG measured Mineral resources 4,050 5.3 693 2.30 - 2.90 92 % UG indicated Mineral resources 20,743 5.0 3,367 1.89 - 3.08 92 % UG measured + indicated Mineral resources 24,792 5.1 4,059 1.89 - 3.08 92 % UG inferred Mineral resources 10,663 5.1 1,735 1.89 - 3.08 92 % Open Pit Mineral resources OP measured Mineral resources - - - - OP indicated Mineral resources - - - - OP measured + indicated Mineral resources - - - - OP inferred Mineral resources 357 1.9 22 0.66 92 % Stockpile Mineral resources SP measured Minerals resources - - - - SP indicated Mineral resources - - - - SP measured + indicated Mineral resources - - - - SP inferred Mineral resources - - - - Total Granny Smith Mineral resources Total measured Mineral resources 4,050 5.3 693 2.30 - 2.90 92 % Total indicated Mineral resources 20,743 5.0 3,367 1.89 - 3.08 92 % Total measured + indicated Mineral resources 24,792 5.1 4,059 1.89 - 3.08 92 % Total inferred Mineral resources 11,020 5.0 1,757 0.66 - 3.08 92 % Note: a) Rounding of figures may result in minor computational discrepancies. b) Mineral resources are exclusive of Mineral reserves. c) Mineral Resources categories are assigned with consideration given to geological complexity, grade variance, drillhole intersection spacing and proximity of mining development. d) Quoted as diluted in situ metric tonnes and grades. Metallurgical recovery factors have not been applied to the Mineral resource estimates. The approximate metallurgical recovery factor is 92 %. The metallurgical recovery is the ratio, expressed as a percentage, of the mass of the specific mineral product recovered from ore treated at the process plant to its total specific mineral content before treatment. Granny Smith mining operations vary according to the mix of the source material. e) The metal prices used for the 2021 Mineral resources are based on a gold price of $1,500 per ounce or A$2,000 per ounce (at an exchange rate of A$1: $0.75). Open pit Mineral resources at the Australian operations are based on revenue factor 1 pits and the underground Mineral resources on appropriate mine design and extraction schedules. The gold price used for Mineral resources approximates 15 % higher than the selected Mineral reserve. f) The cutoff grade may vary per shaft, open pit or underground mine, depending on the respective costs, depletion schedule, ore type, expected mining dilution and expected mining recovery. The average or range of cutoff grade values applied to the Mineral resources are; Granny Smith 2.11 g/t to 3.08 g/t Au mill feed (underground) and 0.66 g/t Au (open pit). g) The Mineral resources are based on initial assessments at the resource gold price of $1,500/oz and consider estimates of all Granny Smith costs, the impact of modifying factors such as mining dilution and mining recovery, processing recovery and royalties. Mineral resources are also tested through the application of Environmental, Social and Governance (ESG) criteria to demonstrate reasonable prospects for economic extraction. h) The Mineral resources are estimated at a point in time and can be affected by changes in the gold price, US Dollar currency exchange rates, permitting, legislation, costs and operating parameters. Source: Granny Smith CPR, 2021 P a g e 78 | 136 The Mineral resources are based on initial assessments at the resource gold price of $1,500/oz and consider estimates of all Granny Smith costs, the impact of modifying factors such as mining dilution and recovery, processing recovery and royalties to demonstrate reasonable prospects for economic extraction. 11.3 Audits and reviews All Granny Smith resource models compiled by site personnel are reviewed by Gold Fields regional technical staff and Corporate Technical Services (CTS) prior to release for mining and Mineral reserve assessment. The Mineral resource estimate was also subjected to internal review and scrutiny by the relevant Qualified persons and regional technical and financial disciplines, and peer reviewed for technical assurance and compliance in reporting by Gold Fields’ Corporate Technical Services (CTS), Sustainable Development and Head Office Finance teams. The Mineral resource estimate is underpinned by appropriate Mineral resource management processes and protocols to ensure requisite corporate governance in respect of the intent of the Sarbanes-Oxley Act of 2002 (SOX). Technical and operating procedures developed for Granny Smith are designed to be compliant with the SOX framework as adopted by Gold Fields’ Mineral Resource Management for Resource and Reserve estimation, reporting and auditing. Gold Fields uses K2Fly RCubed® propriety software in combination with SharePoint to ensure accuracy, governance and auditability in the reporting of Mineral resources and Mineral reserves. An external audit by Snowden of the Wallaby Zone 110-120 and Wallaby Zone 135 resource models was completed in December 2020, with no material issues identified. 11.4 Comparison with 31 December 2020 Mineral resource No exclusive Mineral resources were disclosed in 2020. Exclusive mineral resources have not been reported on this stock exchange previously, however, in the Qualified persons opinion the 2021 to 2020 resource comparison changes are not material P a g e 79 | 136 12 Mineral reserve estimates 12.1 Level of assessment Granny Smith’s Mineral reserves are that portion of the Mineral resources which, as technical and economic studies have demonstrated, can justify extraction at 31st December 2021. The Mineral reserves are based on appropriately detailed and engineered LoM plans and are supported by relevant studies completed to a pre-feasibility study level. The LoM plans schedule the Mineral resources with appropriate modifying factors applied to estimate Mineral reserves. The process of Mineral reserve definition for Granny Smith follows the mine planning process. Cutoff grades are applied to define potentially economic mining panels before technical analysis is completed and constraints are applied. Infrastructure requirements are then defined, and mine designs are undertaken before an economic analysis is completed. A project must return a sufficient margin above the cutoff to cover the required capital development costs and provide a return on investment. All ore at Granny Smith is currently sourced from underground with the mining predominantly carried out by Granny Smith as an owner miner. Underground optimisation relies on the creation and evaluation of mining increments. Mining methods are largely determined by the geometry of the mineralised zones and the evaluation may involve the review of more than one method. Discrete zones within the defined areas of interest are further evaluated to ensure they satisfy overall economic criteria including any additional capital requirements. Infrastructure, waste disposal and ore stockpile management requirements are incorporated into the planning process. All mine design and scheduling are completed by experienced engineers using appropriate mine planning software and incorporates relevant modifying factors, cutoff grades and the results from other techno-economic investigations. Mining rates, fleet productivities, operational and plant capacities and constraints are accounted for in the plan and are typically based on historical performance trends. All geotechnical protocols and constraints are accounted for in the plan, including the provision for suitable mining geometries, mining losses, mining recovery and dilution. Provision is also made for sufficient waste rock and tailings storage with plans in place to meet LoM requirements. Mineral reserves are derived from LoM plans for currently producing operations and ore stockpiles. For all other projects, Mineral reserves are derived from a minimum pre-feasibility level study with individual cost input parameters used to define the cutoff grades. A pre-feasibility study has an estimated accuracy of ± 25 % with a contingency of no more than 15 %. The generation of a LoM plan requires substantial technical input and detailed analysis and is critically dependent upon assumptions of the long-term commodity prices and sustained operating expenditure and the respective impact on cutoff grades, potential expansion and/or reduction in the Mineral resource and the return on capital expenditure. The basis of forward projections of operating costs for mature mining operations consider recent historical and forecast performance, including modifications for inflation. Capital costs are based on detailed requirements for the next two years and have in general an order of accuracy of ±10 %. Capital estimates beyond next two years, are based on pre- feasibility or better estimates for infrastructure and development requirements for individual projects. The point of reference for the Mineral reserves is ore delivered to the processing facility, also known as run-of-mine or RoM ore. The Qualified person’s opinion of the 2021 Mineral reserve estimates is: a) The modifying factors are based on recent mining and processing extraction history and performance and are reasonable and appropriate to derive the reserves from the resources and minimise any estimation errors. The modifying factors are aligned with leading industry technical practice, for example, blended process recovery is used in the reserve estimate. P a g e 80 | 136 b) Granny Smith has grown its Mineral reserves over the past three reporting cycles net of depletion. Infrastructure, environmental, permitting, closure, utilities and baseline studies are all aligned to support continued Mineral reserves growth. Granny Smith’s proactive study pipeline retains a focus on progressing all key work integral to supporting ongoing life-of-mine extensions so as to avoid any potential production delays. For example, a study has been completed to extend tailings disposal capacity. c) The indicated and measured Mineral resource is sufficient in geoscientific confidence to complete final life-of- mine designs. However, it is usual to complete a final phase of infill drilling to determine a high confidence ‘mine defined’ resource with detailed geoscientific information prior to final stope design, pillar layouts and detailed production scheduling. d) The reported reserve is a ‘point in time’ or snapshot of the life-of-mine plan as at 31 December 2021. It is supported by a technically valid and economically viable mine design and schedule combining open pits and three underground mines. The techno-economic work does not exceed the estimated accuracy of ±25 % and or require more than 15 % contingency for both operating and capital costs. e) Environmental compliance and permitting requirements have been assessed in detail with supporting baseline studies and relevant preliminary internal impact assessments completed. Detailed tailings disposal, waste disposal, reclamation, and mine closure plans are incorporated into the life-of-mine plan. The life-of-mine plan, in toto, is completed to a minimum pre-feasibility level of study, although certain components of the plan have been completed to a feasibility level of study 12.2 Mineral reserve estimation criteria 12.2.1 Recent mine performance The recent performance Granny Smith is summarised in Table 12.2.1. There has been no open pit mining at Granny Smith since 2006. 12.2.2 Key assumptions and parameters The assumptions and parameters considered in the Mineral reserve estimate are summarised in Table 12.2.2. The Mineral resources for Granny Smith underground and Hillside open pit were not converted to a Mineral reserve. Mining costs are underground mining costs, including ore handling costs. Mining costs are based on the 2022 budget unit costs, applied to the planned physicals. Processing costs include tailings and waste disposal costs, as well as the cost of maintaining key on-mine infrastructure. Table 12.2.1: Recent operating statistics Units 2021 2020 2019 Underground mining Total mined kt 2,622 2,336 2,342 - Waste mined kt 965 637 631 - Ore mined kt 1,657 1,700 1,712 Mined grade g/t Au 5.68 5.32 5.29 Processing Tonnes treated kt 1,662 1,719 1,753 Head grade g/t Au 5.66 5.27 5.2 Yield g/t Au 5.23 4.88 4.88 Recovery % 92.9 93.0 93.6 Gold produced koz 279 270 275 Financials Exchange rate $:A$ 0.75 0.69 0.7 Operating cost $/oz 674 642 575 Cost of sales before amortisation and depreciation $/oz 693 620 572
P a g e 81 | 136 Total cash cost $/oz 666 628 564 Capital expenditure $ m 100 66 72 All in sustaining cost (AISC) $/oz 1033 1010 922 Total employees costed (TEC) No. 717 592 541 Note: a) The operating statistics are based on annual fiscal year measurements Source: Granny Smith CPR, 2021 Table 12.2.2: Summary of material modifying factors Units 2021 2020 2019 Mineral resource Mineral resource gold price $/oz 1,500 1,500 1,400 $:A$ 0.75 0.75 0.76 A$/oz 2,000 2,000 1,850 Cutoff for open pit g/t Au 0.66 0.58 - 0.62 0.59 - 0.63 Cutoff for underground - Wallaby g/t Au 2.30 – 3.08 2.20 - 2.80 2.14 - 2.87 Cutoff for underground - Granny Smith g/t Au 2.11 2.11 2.08 Mineral reserve Mineral reserve gold price $/oz 1,300 1,300 1,200 $:A$ 0.74 0.74 0.75 A$/oz 1,750 1,750 1,600 Cutoff for mill feed - underground g/t Au 2.63 – 3.48 2.49 - 3.17 2.46 - 3.29 Mining recovery factor - underground % 90 – 92 90 - 92 90 - 92 Mining recovery factor open pit % n/a n/a n/a MCF % 100 100 100 Dilution underground % 11 – 20 12 - 20 12 - 16 Plant recovery (average) % 92.0 92.3 92.8 Processing Capacity Mt/a 3.5 3.5 3.5 Note: a) The 2021 fiscal modifying factors are valid as at 31 December 2021 and are considered when estimate the Mineral reserves and resources. b) The metal prices selected remained the same for the past two reserve and resource estimates. c) The Qualified person is of the opinion that the modifying factors are adequate for Mineral reserve reporting and that the modifying factors are reported in ranges and vary based on open pit and underground extraction and estimated unit costs for depth and distance hauled. d) The Qualified person is of the opinion that the modifying factors estimated minimise estimation errors. Source: Granny Smith CPR, 2021 G&A costs are largely based on the required and necessary technical and administrative support services required to sustain current and future mining production. In most instances these are assigned with fixed and variable cost components per tonne of ore within both the reserve estimation and corresponding financial models. Corporate costs are assigned as variable with ounces sold in the financial model. Operating expenditures comprise: Cash Cost Components: include direct mining costs, direct processing costs, direct G&A costs, consulting fees, management fees, transportation and realisation charges. Total Cash Costs: include additional components such as royalties (excluding taxes where appropriate). Total Working Costs: include terminal separation liabilities, reclamation and mine closure costs (the net difference between the total environmental liability and the current trust fund provision) but exclude the salvage value on closure and non-cash items such as depreciation and amortisation. Total Costs: total working costs plus net movement in working capital plus capital expenditure. Major Capital Projects: In addition to long-term capital projects, the LoM capital expenditure programs generally include detail based on approved expenditure programs. Details of the forecast operating and capital expenditures are provided in Section 18. P a g e 82 | 136 As disclosed in Section 11.1.10, Gold Fields conducts an annual review of metal prices for Mineral resource and Mineral reserve reporting to monitor any significant changes that would warrant re-calibrating the price deck for strategic and business planning purposes. This review considers prevailing economic, commodity price and exchange rate trends, together with market consensus forecasts and Gold Fields’ strategy and expectations for the mine operations. The Mineral reserve gold price of $1,300/oz is detailed in particularity in Chapter 16 marketing. The Qualified person is of the opinion that the gold price applied to the estimation of the Mineral reserves is reasonable and suitable for life-of-mine planning and is an appropriate reflection of recent historical trends and importantly provides a metal price that mitigates the risk of short to medium term price fluctuations with the potential to impact on the execution of the life-of-mine reserve plans. The gold price used provides a reasonable long-term delta to current spot prices and incorporates into the life-of-mine plan appropriate contingency to offset possible short term lower price cycles. For the operating mines, 6 to 18 month trailing average actual costs form the basis of the unit rates applied to the reserve financial model, with consideration for expected variations in operating and capital costs. This timeframe is selected based on alignment with recent business planning data. For new mines, costs are based on estimates from a range of recent sources and are deemed appropriate and representative by the Qualified person. The Mineral reserve estimates may be materially affected based on changes to the cost and price assumptions, in addition to changes in the modifying factors. The reserve is assessed at multiple scales, including individual stope or pit, level, orebody, mine, and operation. As such, the Qualified person is of the opinion that the reserve plan should be viewed as a consolidated entity, as removal of key components of the reserve may have a material and disproportionate impact on the overall value and viability of the plan. In addition to changes to modifying factors, additional data acquired into the future may materially impact the reserve estimate. Examples include, but are not limited to, acquisition of additional drilling data, changes to interpretation of the data, mining studies, internal and external approvals and operating strategies. P a g e 83 | 136 12.2.3 Cutoff grades Cutoff grades are influenced by the operating strategy, design and scheduling, and are therefore calculated annually. The cutoff grades used for the underground Mineral reserves are calculated using the same methodology described in Section 11.1.10 at the reserve gold price of $1,300/oz. The cutoff grades by deposit are summarised in Table 12.2.3. Table 12.2.3: Underground reserve cutoff grades Reserve cutoff grade (g/t Au) RoM Expected process recovery (%) Minimum mining width (m) Z60_Joey 2.63 93.5 3 m Zone 70/80 2.84 89.3 3 m Zone 90 2.87 89.3 3 m Zone 100 Main 3.03 89.6 3 m Zone 100 Vertical 3.20 90.0 3 m Zone 110 3.29 90.1 3 m Zone 120 3.25 90.1 3 m Zone 135 Main 3.32 90.7 3 m Zone 135 Vertical 3.48 90.7 3 m Total Wallaby Underground 3.21 90.0 3 m Granny Smith Underground 2.14 88.3 3 m Note: a) The underground cutoffs are estimated based on the reserve price, reserve modifying factors and are not expected to change materially over the life-of- mine reserve. b) The estimated cutoff grades are adjusted for increased unit costs associated with depth and support type costs. c) The Qualified person is of the opinion that the estimated life-of-mine schedule contains sufficient diligence to minimise errors. Source: Granny Smith CPR, 2021 12.2.4 Mine design and planning The main objective of the mine design and planning strategy at Wallaby is to maximise value from the Mineral resource while achieving a target free cashflow margin from the operation. The Wallaby underground mine is currently designed to exploit the stacked mineralised lodes from Zones 60/250, 70, 80, 90, 100, 110-120 and 135 to a depth of ~1.5 km below surface (Figure 12.2.1). Each zone has undergone a minimum pre-feasibility study assessment followed by staged development access and eventual mining. This approach provides a much higher level of confidence in mining prior to approval and allows for a safe and efficient mining strategy to be developed prior to mining. During 2021, mining was concentrated in Zones 250/60, 80, 90, 100, 110-120,135. An expanded pre-feasibility study was completed for Zone 135 in 2019 with a feasibility study completed in 2021. Access to the Wallaby underground mine is via a ramp decline from a portal established within the completed Wallaby open pit. The current portal and Wallaby pit surface ramp are assumed to be accessible for the remainder of the mine life. The mine operation is trackless, with truck haulage from underground via the ramp to surface. Generally, exploitation of the Wallaby ore lodes progress top-down, although simultaneous exploitation of vertically adjacent lodes is required to achieve the targeted 1.70 Mt/a production rate. Likewise, from each lode, more than one stoping panel is extracted so barrier/regional pillars are used to separate mining panels according to geotechnical directions. As mining progresses to increasing depth, infrastructure and services are extended to support ongoing development and production activities. P a g e 84 | 136 Figure 12.2.1: Wallaby mining areas (west view) Source: Granny Smith CPR, 2021 The Mineral reserve estimate includes external dilution and mining recovery factors based on the selected mining method and historical reconciliations. A planned internal dilution of 0.2 m in height and width is applied to development for all mining methods with 100 % mining recovery. The following standard development dimensions are used: Decline and truck accesses - 5.5 mW × 5.7 mH Ore drives (existing stoping methods) - 4.6 mW × 4. mH The mine planning process is to identify and optimise all feasibly minable material that is identified in the resource geology models through creating and evaluating of mining access and stoping in the reserve plan. Mining methods are largely determined by the geometry of the mineralised zones. Individual zones are evaluated to optimise overall schedule economics. The infrastructure required to access the mineralisation is then designed before evaluation of the mine. Discrete zones within the defined areas of interest are further evaluated to ensure they satisfy overall economic criteria including any additional capital requirements. The geotechnical and hydrogeological parameter is discussed in Section 13. At present there are limited material technical risks such as staffing, logistics, equipment, ventilation or seismic impacts that are expected to prevent the mine from achieving the LoM plan; however, the following risks may constrain the mine plan at various points. Ventilation Fresh air is brought into the mine via the decline and fresh air raise system and exhausted via five exhaust raises with primary ventilation fans situated at the bottom of each rise. A review of the long-term primary ventilation system was undertaken in 2019 when the Zone 135 Stage 2 study was completed. From the study, several ventilation upgrades ensued including a new ventilation exhaust raise (VR8), and the replacement of the existing primary fans with four new fans. The current ventilation upgrades are sufficient for the current LoM.
P a g e 85 | 136 Refrigeration and cooling A 4.1 MW surface bulk air cooler was commissioned in 2017 above the VR7 intake air rise, which cools 300 m³/s of ambient air during summer and currently services the southern production areas of the mine. The bulk air cooler will be upgraded to 8.2 MW at the beginning of summer 2022/2023. An additional 4.1 MW bulk air cooler of the same design has been constructed on top of the VR6 intake rise, which services the northern production areas and cools 270 m³/s of air. Once the refrigeration system has been upgraded this will be sufficient for the current LoM. 12.2.5 Mine planning and schedule The company’s annual mine planning process is anchored by a corporate planning calendar that sets out the sequence of events to be followed that ensures a strong linkage between the strategic planning phase and the life-of-mine plan itself that defines the Mineral reserves. During the first half of the year the preferred strategic plan is confirmed and approved by the company Executive Committee. This provides guidance for required investment and business and operational planning to position the mine to deliver on the strategic intent for the property. The detailed two-year operational plan and budget is informed by financial parameters determined by the Executive Committee and is the anchor to the longer-term planning and equates to the first two years of the life-of-mine plan. The overall planning process schedules key work to be completed and stage gated before subsequent work can be continued and includes the metal prices, geology and estimation models, resource models, mine design, depletion schedules, environmental and social aspects, capital and operating costs and finally the cashflow model and financial valuation. Capital planning is formalised pursuant to Gold Fields’ capital investment and approvals process. Projects are categorised and reviewed in terms of total expenditure, return on investment, net present value (NPV) and impact on All-in Costs (AIC) per ounce and all projects involving amounts exceeding $40 million are submitted to the Board for approval. Material changes to the plans are referred back to the Executive Committee and the Board. Post- investment reviews are conducted to assess the effectiveness of the capital approvals process and to leverage continuous improvement opportunities going forward. The Mineral reserve estimates are based on an appropriately detailed and engineered life-of-mine plan that is supported by relevant studies completed to a minimum PFS level of work. All design and scheduling is completed by experienced engineers using appropriate mine planning software and incorporates all relevant modifying factors, the use of cutoff grades and the results from other techno-economic investigations. Mining rates, fleet productivities and all key operational and plant capacities and constraints are accounted for in the plan and are typically based on historical performance trends. All geotechnical protocols and constraints are accounted for in the plan, including the provision for suitable mining geometries and ground support, mining losses in pillars, mining recovery and dilution. The provision of sufficient waste storage and tailings capacity is engineered into the plans to meet the life-of-mine requirements. Mine planning is driven primarily by personnel at the mine who are best positioned to determine the technical and commercial objectives for the site based on the parameters, objectives and guidelines issued by the corporate office. The site-based planning is supported by regional technical services functions, as well as from corporate technical services (CTS) and the corporate finance and sustainable development teams which provide overall oversight and assurance. The scheduled target rates adopted for LoM planning are based upon historical operational mining rates and are matched appropriately for future zones. The LoM plan is made up of the following underground mining areas. Wallaby Zone 250/Joey Wallaby Zone 60 Wallaby Zone 70 Wallaby Zone 80 Wallaby Zone 90 P a g e 86 | 136 Wallaby Zone 100 Wallaby Zone 110 Wallaby Zone 120 Wallaby Zone 135 There are currently no other projects included in the LoM plan. Underground mining equipment is scheduled on the available time the equipment can be used. This availability is based on calendar hours and allows for scheduled repairs and maintenance of the equipment. The current equipment actual and planned availabilities and utilisation for 2021 are shown in Table 12.2.4. Table 12.2.4: Equipment availabilities and utilisation Equipment 2021 availability 2021 utilisation of availability Actual % Planned % Actual % Truck 84 85 68 Loader 79 80 75 Development Drill 83 83 78 Production Drill 86 85 79 Note: a) The estimated reserve life-of-mine mining equipment fleet is expected to vary based on the open pit underground mining ratios. b) The heavy mobile mining fleet is renovated based on manufacturers specification or on regular maintenance records. c) The Qualified person is of the opinion that Granny Smith fleet and the fleet of the contractor support the life-of-mine reserve Source: Granny Smith CPR, 2021 Underground mine schedules are based on 3D block Mineral resource models (inventory models), with allowances made for minimum mining widths, dilution and ore loss appropriate to the mining method being considered and geotechnical considerations. Historical performance measures are considered in determination of these modifying factors. Infrastructure, waste disposal and ore stockpile management requirements are incorporated into the scheduling process. A mining schedule is generated, and a time-based economic evaluation is undertaken to ensure the mines remain economic until completion of mining, at which point rehabilitation commences. Provided that individual mining areas cover the direct mining costs (capital and operating), variable processing, TSF, rehabilitation and on-site administration costs, contribute to overhead fixed costs, and do not increase the overall life of the operation (i.e. mine constrained), the material can be included in the reserve assessment. Refer to Section 19.1 for details on the LoM mine schedule. The Qualified person is of the opinion that the mine plan and schedule incorporate appropriate assessment of all relevant technical, environmental, social and financial aspects to ensure the Mineral reserve complies with the SK rule instructions and requirements. After reasonable assessment there is no unresolved material matter that could have a significant impact on the mines ability to execute the life-of-mine plan. The mine plan and schedule incorporate consideration of the following key criteria: Production depletion up to 31 December 2021. Application of cutoff grades to determine mineable ore. Application of appropriate modifying factors to convert resource to reserve. Allocation of suitable mining equipment and costs. Incorporation of realistic mining rates and efficiencies. Practical and realistic mine design and mining methods. P a g e 87 | 136 Integrated production scheduling taking account of capacities, constraints and bottlenecks. Use of appropriate paste filling rates for stope voids. Integrated project management and execution. Security of water and energy for the life-of-mine. Provision for mine rehabilitation and mine closure costs. Consideration of all environmental, social and legal aspects to enable life-of-mine plan execution. Appropriate life-of-mine tail end management. Security of current and future land tenure and relevant leasing agreements, permits and licenses. Life-of-mine cashflow model and economic viability. 12.2.6 Processing schedule The processing schedule is derived from the Mineral reserve schedule. The individual ore type recovery formulas as detailed in Section 10.2 are used in the mine schedule to aggregate into an overall process recovery. Refer to Section 19.1 for details on the LoM processing schedule. 12.2.7 Classification criteria Granny Smith’s Mineral reserves are classified as either proven or probable in accordance with the definitions in Subpart 229.1300 of Regulation S-K. A proven Mineral reserve is assigned if it is flagged as a measured Mineral resource, the reserve block is covered by sufficient infill drillholes and/or exposed by development face mapping. A probable Mineral reserve is assigned if it is flagged as an indicated Mineral resource, is only covered by exploration drillholes, and has no development face mapping. The Mineral reserves are quoted in terms of RoM grades and tonnages delivered to the processing facility and are therefore fully diluted. 12.2.8 Economic assessment The basis for establishing economic viability is discussed in Section 19. P a g e 88 | 136 12.3 Mineral reserves as of 31 December 2021 The Granny Smith Mineral reserves as of 31 December 2021 are summarised in Table 12.3.1. The Mineral reserves are 100 % attributable to Gold Fields and are net of production depletion up to 31 December 2021. The point of reference for the Mineral reserves is ore delivered to the processing facility. The Granny Smith Mineral reserves are the economically mineable part of the measured and indicated Mineral resources based on LoM schedules and pre-feasibility studies completed at the reserve gold price of $1,300/oz to justify their economic viability at 31 December 2021 (refer to Section 19 for details on the supporting economic analysis). Table 12.3.1: Granny Smith - summary of gold Mineral reserves at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,300/oz Amount/ (kt) Grades/ (g/t Au) Amount/ (koz Au) Cutoff grades (g/t Au) Metallurgical recovery (%) Underground Mineral reserves UG proven Mineral reserves 2,212 4.9 351 3.21 92 % UG probable Mineral reserves 10,363 5.6 1,861 3.21 92 % UG total Mineral reserves 12,575 5.5 2,211 3.21 92 % Stockpile Mineral reserves SP proven Mineral reserves 26 5.6 5 1.03 83 % SP probable Mineral reserves - - - 1.03 83 % SP total Mineral reserves 26 5.6 5 1.03 83 % Total Mineral reserves Total proven Mineral reserves 2,239 4.9 355 Total probable Mineral reserves 10,363 5.6 1,861 Total Granny Smith Mineral reserves 2021 12,601 5.5 2,216 Total Granny Smith Mineral reserves 2020 12,613 5.3 2,167 Year on year difference (%) -0.1% 2% 2% Note: a) Rounding of figures may result in minor computational discrepancies. b) Refer to Table 12.5.1 for year-on-year Mineral reserve comparison. c) Quoted as mill delivered metric tonnes and run-of-mine (RoM) grades, inclusive of all mining dilutions and gold losses except mill recovery. Metallurgical recovery factors have not been applied to the reserve figures. The approximate metallurgical recovery factor is 92 % for underground feed. The metallurgical recovery is the ratio, expressed as a percentage, of the mass of the specific mineral product recovered from ore treated at the process plant to its total specific mineral content before treatment. The recoveries for Granny Smith vary according to the mix of the source material (e.g. oxide, transitional fresh and ore type blend) and method of treatment. d) The metal prices used for the 2021 LoM Mineral reserves are based on a gold price of $1,300 per ounce or A$1,750 per ounce (at an exchange rate of A$1:$0.74). Open pit Mineral reserves at Granny Smith are based on optimised pits and the underground operations on appropriate mine design and extraction schedules. The gold price used for Mineral reserves is detailed in particularity in Chapter 16 Marketing. e) Dilution relates to planned and unplanned waste and/or low-grade material being mined and delivered to the process plant. Ranges are given for those operations that have multiple orebody styles and mining methodologies. The mine dilution factors is 11 % to 20 % (underground) f) The mining recovery factor relates to the proportion or percentage of ore mined from the defined orebody at the gold price used for the declaration of Mineral reserves. This percentage will vary from mining area to mining area and reflects planned and scheduled reserves against actual tonnes, grade and metal mined, with all modifying factors, mining constraints and pillar discounts applied. The mining recovery factors are 90 % to 92 % (underground). g) The cutoff grade may vary per zone, open pit or underground mine, depending on the respective costs, depletion schedule, ore type, expected mining dilution and expected mining recovery. The average or range of cutoff grade values applied in the planning process are: Wallaby Underground 2.63 g/t to 3.48 g/t Au mill feed. h) A gold based Mine Call Factor (gold called for over gold accounted for) determined primarily on historic performance but also on realistic planned improvements where appropriate, is applied to the Mineral reserves. A Mine Call Factor of 100 % has been applied at Granny Smith. i) The Mineral reserves are estimated at a point in time and can be affected by changes in the gold price, US Dollar currency exchange rates, permitting, legislation, costs and operating parameters. j) Granny Smith is 100 % attributable to Gold Fields and is entitled to mine all declared material located within the properties mineral leases and all necessary statutory mining authorisations and permits are in place or have reasonable expectation of being granted. Source: Granny Smith CPR, 2021 All required permits are documents, applied for and coted to ensure the execution of the mine plan. Regulatory reforms and GFL Policy have been incorporated into environmental risk and permitting to ensure Granny Smith maintains licence to operate. Some regulatory changes are anticipated and are being monitored to ensure compliance is
P a g e 89 | 136 maintained. Granny Smith proactively engages during PFS and strategic Planning regarding any upcoming permitting requirements. 12.4 Audits and reviews Audits and reviews completed at Granny Smith during 2020 included: Site based internal peer reviews, validation and reconciliation of geology models, wireframes, estimates process and outputs with senior Mineral resource management staff and department heads. Ongoing integrated routines for drilling, sampling, geology audits, reviews and coaching of all staff by senior geologists and Mineral resource management department heads to ensure due process and SOX compliance. Perth corporate technical audits & review of geology, estimation and mine planning models. Gold Fields Group Mineral resource management technical team reviews and site visits for validation and compliance evaluation of resources and reserves process, detail and output. OHSAS compliance for certification. ISO14001 surveillance audit by recognised external auditors. ISO45001 certification audit. ISO27001 certification audit. Global Reporting Initiative third party (ERM). Annual external financial audits (KPMG up to 2018, PWC from 2019). Ongoing routine internal audits (Gold Fields Johannesburg Internal Audit). Internal legal compliance and ethics policy review. Internal SOX compliance (Perth and Gold Fields corporate auditors). External audit by Snowden, certificate of compliance issued with no material or adverse findings. No adverse findings were recorded from any of the audits. Ongoing compliance with minor improvement, adjustments and best practice continue to be implemented. Records of audits are filed electronically on site in relevant departments and folders with major audit signoffs reported in the Gold Fields annual report. The Mineral resource estimate is underpinned by appropriate Mineral resource management processes and protocols to ensure requisite corporate governance in respect of the intent of the Sarbanes-Oxley Act of 2002 (SOX). Technical and operating procedures developed for Granny Smith are designed to be compliant with the SOX framework as adopted by Gold Fields’ Mineral resource management for resource and reserve estimation, reporting and auditing. Gold Fields uses K2Fly RCubed® propriety software in combination with SharePoint to ensure accuracy, governance and auditability in the reporting of Mineral resources and Mineral reserves. 12.5 Comparison with 31 December 2020 Mineral reserve The net difference in Mineral reserves between 31 December 2020 and 31 December 2021 is +49 koz Au or +2.3 % (Table 12.5.1). Table 12.5.1: Net difference in Mineral reserves between 31 December 2020 and 31 December 2021 Proven and probable Reserve Unit Change % Gold on the RoM As at 31 December 2020 koz - 2,167 Depletion 2021 koz -13.9 % -302 Gold price koz - - Cost koz -0.5 % -10 P a g e 90 | 136 Incremental koz 1.7 % 37 Conversion koz 13.2 % 285 Inclusion / exclusion koz 1.8 % 39 As at 31 December 2021 koz 2.3 % 2,216 Note: a) Data from reserve 2020 and reserve 2021 has shown that after taking into account 2021 depletion, an additional 49 koz of gold has been added to the Granny Smith reserve, representing a 2.3 % increase from 2020. Source: Granny Smith CPR, 2021 A series of overlapping internal processes exist at Gold Fields to review and validate the modifying factors, input assumptions, cutoff grades, designs, schedules, economic evaluation, and other technical assessments. These reviews include site, regional and group technical assessments, internal audits, and trained Qualified person authorisations. Multiple external audits of the Gold Fields reserves declarations and processes for Granny Smith have been completed within the past 5 years. These processes are designed to reduce the likelihood of a significant or material error in the reserves estimation process and associated reserves declaration, although potential for error exists. The Qualified person for reserves is not aware of any material error or omission that at the time of writing would be deemed likely to have a significant impact on the operation’s ability to deliver the reserve mine plan. P a g e 91 | 136 13 Mining methods 13.1 Geotechnical and hydrological models 13.1.1 Hydrogeological model Section 7.3 describes the hydrogeological model for Wallaby underground mine. The Wallaby deposit occurs below 20 m-110 m of transported aeolian, fluvial, and lacustrine cover that forms part of an extensive regional aquifer system. This aquifer system has known transmissive links between the paleo-drainage system and the underlying Wallaby deposit (e.g. fractured mineralised zones) resulting in a high groundwater yield in the open pit and upper level of the underground mine. Based on historical abstraction data, sump pumping of up to 40 l/s is required to maintain dry mining conditions. However, this does not include any additional surface inflows due to storm or cyclone events. Due to these two factors, successful and efficient dewatering is critical to the function of the underground operations. The main Wallaby underground pump station is in Zone 60, and a new pump station was commissioned in Zone 80, with an overall capacity of 45 l/s. Water from deeper within Wallaby is supplied to the Zone 80 station via a series of pumps at various levels down the decline. Water is transferred to surface via a vertical drillhole into the Wallaby open pit sump and finally to Lake Carey. Hypersaline water pumped directly from Wallaby underground onto Lake Carey is governed by a series of regulatory requirements (refer to Section 7.3). The majority of the excavations underground are dry except where water-bearing structures are exposed and thus corrosion is not considered a major issue with fully encapsulated reinforcement for all capital infrastructure. Discrete seepage zones have been encountered as geological features are traversed, many of which remain damp (<1 l/sec) for the duration of mining. Only minor rehabilitation due to corrosion and water related issues has been required to date in Z60-Z70 level. Fibrecrete applied to seepage zones will have provision for drainage via Split-Sets to prevent build-up of water pressure behind the Fibrecrete seal, or the installation of weep holes. All capital infrastructures in the upper level have ground support standard that involves fibrecrete and resin bolts. The resin bolts are fully encapsulated as such less prone to corrosion. Temporary excavations such as oredrive generally have ground supports that involves mesh and split-sets. These excavations have life expectations less than 2 years which is within acceptable limits in for the type of water salinity experienced at Wallaby. Historically the Zone 70 E was a mining area where water issues were identified. The extent of flow is very slow to slow and only observed in split sets due to drainage from a larger volume of rockmass. The Qualified person’s opinion is that all appropriate geotechnical and hydrogeological parameters have been suitably considered and risk assessed to support the mining method selection and extraction sequencing and this information is embedded in Granny Smith’s Ground Control Management Plan which is routinely updated as new empirical information becomes available. The mine plan is geotechnically robust from a local and regional stability perspective. 13.1.2 Geotechnical model The geotechnical models comprise the rock mass properties, geological structures as well geological model. The geotechnical models have been developed at Wallaby and is used to help to assess development and stope design as well as completing reconciliations, model calibration and ground support performance. Smaller models are also used to assess rock mass conditions in new mining levels and zones. There are a few models that have been created and used at WUM. These include: Lithology Model and Major Structural Model. P a g e 92 | 136 Fracture Frequency and/or RQD and/or Q’ Block Model. The Void Model. Lithology and Major Structural Model All of the recognised ore surfaces, major structures (Wedge, East Shears and Lamprophyres) and major intrusives have been created as three-dimensional triangulation models. The Geology Department routinely updates these structural models for features intersected during development (i.e. localised faulting, lithology). This model is used to identify and delineate boundaries of geotechnical domains in three-dimensional space. Mapping and structural data can be used in conjunction with the above model to determine the rock mass quality within the mine and identify areas of poor ground as well as characterise the geotechnical domains. The model is also used for ground support design in different domain with increasing depth. Fracture Frequency and/or RQD and/or Q’ Block Model Detailed rock mass characteristics for each individual stope are obtained by conducting geotechnical mapping of ore drives (post ground support installation) and geotechnical core logging of oriented drillholes, this information is used for the determination of the geotechnical characteristics of each domain. This process helps to identify areas of reduced rock mass quality which may affect the stability of the stopes. The Void Model The void model for Granny Smith Underground is available in Datamine ® and Deswik® Wireframe format. This file is created and updated using all void surveys which are processed using Deswik® mining software. The survey department is responsible for maintaining the void model for the mine, which include lateral development, vertical development and stope voids. Numerical Analysis Numerical modelling to assess mining induced stress changes and impacts has been conducted both internally using Map3D Fault-Slip and externally using Abaqus. The determination of the global rock mass response to the stress redistribution has been conducted using non-linear- modelling methods in Abaqus by external consultant. The aim of these non-linear models was to identify global instabilities, obtain the most economic, geotechnically sound extraction sequence and finally to define rules regarding pillar size, geometry and location. The geotechnical design involves the sizing of various excavation geometries, location of the infrastructures, location, and sizing of pillars (i.e. barrier, regional and panel pillars), the timing of paste fill for each block as well as the extraction sequence. Ongoing calibration of these models is used to model and maintain the overall global stability of the mine, and assess new mining areas during Front End Studies (i.e. Feasibility studies). Detailed numerical models are also completed on more specific and targeted areas when design criteria are being challenged or for variations on the normal mining method. The risk associated with seismicity at depth are managed through the following strategies: a) Mine planning and design guidelines which ensure appropriate mine designs are generated. Geotechnical considerations form a key component of these designs and guide the design based on important constraints identified during feasibility and progressive mining of the orebody. The guidelines have been written to address various geotechnical issues during the mine planning and design process. b) Sizing the mining zones into blocks of various geometries depending on depth starting Z100 level. Each block is separated by barrier pillars and or regional pillars. Z100 -Z120 the block sizes are 150 mW x 150 mL. Each block
P a g e 93 | 136 is divided into panel and pillars of which the sizing of the panel pillar depends on the global non-linear modelling results. c) Global and local mining sequence whereby blocks are sequenced based on the spatial locations as well as the influence of various geological structures that are prone to seismicity. The mining sequence plays a dominant role to ensure the hazards associated with high stress and seismicity are managed. d) Paste filling which was introduced in the lower levels to maintain long-term regional stability and also to limit the exposure of large spans in the stoping area. e) Modelling of major and minor geological structures which are used in the non-linear numerical model as well for planning and design of the stopes. f) Ground support design at which the developed Ground Support Standard for each mining profile has specific requirements (e.g. bolting and meshing) that are determined by development dimensions, the expected ground conditions, and the excavation life and serviceability as well as the stress conditions. g) Seismic exclusion after each stope firing which is assigned based on the historical seismic activities, specific geotechnical domains and the presence of major geological structures. 13.2 Mining methods Due to the variable sub-horizontal nature of the orebody, the mining methods at Wallaby involves a variation of a long- hole room and pillar methodology with no backfill in upper levels (above Z100 level) and hybrid of long-hole room and pillar with and without paste fill below Z100 level. The main mining method at Wallaby is inclined room and pillar (IRP). Other methods utilised are transverse longhole stoping (TLHS) and sub-level longhole stoping (SLHS). Bulk longhole stoping is also used, but to a lesser extent. The current Reserve outline is shown in Figure 13.2.1. 13.2.1 Inclined room and pillar (IRP) IRP is used in areas of moderate ore dip (10 °-45 °) and moderate ore width (4 m-6 m). Multiple ore drives are developed on a fixed gradient to traverse the ore lenses following the ore contour on that elevation. Stoping is carried out on retreat from the ore extremity back to a central main lode access. Up-hole retreat stoping is employed with blast holes drilled at 76 mm diameter. To initiate the starting void for the stopes, longhole rises are employed typically up to a depth of 15 m. Where the stope geometry is too complex or the rise requirement exceeds 15 m, slot drives are employed to create the initial void. In the upper levels, stopes are limited to 30 m along strike with a 5 m pillar left between stopes and do not require backfill. In the lower levels, stopes are limited to 20 m along strike with a 7 m pillar left between stopes. Stopes in the lower levels require backfill. The general sequence of mining in a cluster of stopes is top-down with the top stope leading the retreat by a 45 ° angle of retreat. This allows for multiple fronts of mining and will also progressively shift the stress concentration in a controlled manner. The use of IRP mining at Wallaby has shown: It is relatively inefficient in terms of production (due to the small stope size of 3,000 t - 4,000 t) and therefore produces 12,000 t - 15,000 t per month from individual areas. It requires considerable technical and operational effort to design, manage and control the stopes. Considerable ore loss can occur with ore left in the footwall area due to geometrical limitations. Maintaining geological control of the ore development lateral direction is more challenging in the flatter ore lodes. The room and pillar mining method with isolated rib and barrier pillars is currently transitioning to a continuous stope- paste fill mining sequence for the Zone 110 and Zone 120 lodes. The first paste fill stope was poured in July 2019 on the Zone 100 level. Structural influences on stability are also becoming more commonplace resulting in a focus on structural mapping and characterisation in all active development to define the continuity of major structures (with a focus on lamprophyre intrusions) and their potential influence on stability of mining areas going forward. P a g e 94 | 136 13.2.2 Transverse longhole stoping (TLHS) TLHS is usually used in near horizontal zones with thicknesses up 20 m. In these extensive areas, the ore lode is divided into zones or mining panels approximately 150 m wide and 150 m long. Each panel is separated by regional barrier pillars to be mined at later stages of mining by retreat and are approximately 30 m wide. Each panel is in turn divided into several transverse mining stoping areas. Ore development for each TLHS area is achieved by following the ore lode gradient with a set horizontal orientation. The ore drive is positioned approximately 2 m below the ore lode footwall, largely in a prevalent low-grade gold alteration area. Each TLHS area is mined by up-hole retreat stopes using a longhole raised slot mined back to a central access. TLHS stoping panels are limited to 15 m in width and 20 m in length with rib pillars surrounding all sides. Rib pillars dimensions are calculated for each zone based on geotechnical parameters. A wider pillar between ore drives is left under a minimum 5 m vertical pillar to reduce pillar slenderness. The use of TLHS mining at Wallaby has shown: Improved stoping efficiency with stope sizes up to 30,000 t. Production rates over 18,000 t/month from individual stoping areas. Improvements in production drilling efficiency. 13.2.3 Sub-level longhole stoping (SLHS) with paste fill This mining method is applied to areas where the orebody has a sub-vertical orientation (55 ° - 75 °). Typical stope dimensions have a strike length of 20 m – 25 m and width of 3 m -7 m. Each stoping block is backfilled with paste after extraction. The lead stope on each level creates the starting void by employing longhole rises and boxhole rises. Subsequent stoping panels are opened by firing against the backfilled mass of the preceding panel. The mining sequence for the vertical lode will follow a continuous top-down echelon end-on retreating between levels to the access. There are no pillars currently planned for the vertical lodes other than uneconomical waste pillars. Gold Fields has a long history of successfully employing this mining technique at Granny Smith and St Ives; however, SLHS with paste fill has not yet been used at Wallaby due to the flat nature of the orebodies mined to date. This method is planned for future mining areas. 13.2.4 Bulk longhole stoping This mining method is applied to areas where two or three lodes are combined, and the total ore thickness is greater than 20 m. The lodes are divided into zones or mining panels approximately 100 m wide and 100 m long. Each panel is separated by regional pillars to be mined at later stages of mining by retreat and are approximately 20 m wide. Areas are mined by up-hole retreat stopes using a longhole raised slot mined back to a central access. The use of bulk mining at Wallaby has shown: Improved stoping efficiency with stope sizes up to 80,000 t. Production rates over 22,000 t per month from individual stoping areas. Improvements in production drilling efficiency. Wallaby underground utilises different dilution and recovery factors for the varying mining methods and zones. The dilution and recovery factors are listed in Table 13.3.1 P a g e 95 | 136 Table 13.2.1: Mining Dilution and recovery factors for each mining method Stope type Hole diameter Dilution Mining recovery Dilution grade (g/t) Mining zone IRP Stopes – No Fill 4-10 m Height 76 mm 16 % 90 % 2.0 g/t 60 to 100 >10 m Height 76 mm 12 % 90 % 2.0 g/t 60 to 100 Inclined Stopes – Paste Fill 4-10 m Height 76 mm 16 % - 20 % 92 % 0.5 g/t 110 to 135 LH Stopes – Paste Fill 10-23 m Height 89 mm 12 % - 18 % 92 % 0.5 g/t 110 to 135 >23 m Height 89 mm 11 % - 16 % 92 % 0.5 g/t 110 to 135 Source: Granny Smith CPR, 2021 Figure 13.2.1: End of Mineral reserve outline Source: Granny Smith CPR, 2021 P a g e 96 | 136 13.3 Equipment and labour requirements Wallaby underground mining equipment is predominantly an owner-operated fleet, with maintenance activities undertaken in-house. Wallaby utilises contractors for development, cable bolting and charging activities. The underground owner mining fleet is listed in Table 13.3.1. Table 13.3.1: Underground mining fleet Equipment class Number of units Development drill 5 Production drill 4 Cable bolt drill 1 Bogger 9 Haul truck 12 Charge wagon 3 IT 8 Grader 2 Water truck 1 Fibrecrete spray rig 2 AGI truck 2 Source: Granny Smith CPR, 2021 Loading is carried out using load-haul-dump (LHD) units, as either manned units for loading trucks or tele-remote units for stope bogging. Haulage to surface is completed using 65 t haulage trucks. Waste material is backfilled in the Wallaby open pit and ore is stockpiled on surface. A contractor fleet using 190 t capacity road trains carries out haulage from the surface ore stockpile to the RoM pad near the Granny Smith process plant, a distance of 13 km. The Qualified person considered the following factors when selecting the underground mining method for the Waroonga, New Holland and Redeemer areas: a) The geotechnical and rock behaviour models. b) The hydrological surveys. c) The modifying factors including underground cutoff grades. d) The mining fleet configuration and equipment specifications. e) Practical mining rates, stope size dimensions, mining dilution and mining recovery. f) Infrastructure and operating capacities and constraints. g) Capital and operating costs and economic viability.
P a g e 97 | 136 14 Processing and recovery methods 14.1 Flow sheet and design The Granny Smith processing plant was originally commissioned in 1990 to treat oxide gold ores mined from the Goanna, Granny and Windich pits and was periodically upgraded to optimise recovery of the sulphide ore from Wallaby underground. The plant currently only treats Wallaby ore in campaign mode. The crushing plant consists of two independent circuits – one for soft ore and one for hard/fresh ore. This is followed by a standard semi-autogenous grinding (SAG) and ball mill (SABC) grinding circuit, a gravity circuit, a leach/carbon- in-pulp (CIP) train, a pressure Zadra elution circuit, a tailings recovery circuit and thickener. A schematic process flow sheet for the process plant is shown in Figure 14.1.1. Figure 14.1.1: Schematic flow diagram of Granny Smith process plant f Source: Granny Smith CPR, 2021 The crushed product is fed from the stockpile and ground to P80 110 μm – 120 μm using a 3.9 MW variable speed 28’×12’ SAG mill, a 185 kW pebble crusher and a 4.0 MW ball mill in closed circuit. In 2015, a gravity circuit was retrofitted and comprises two 40” QS40 Knelson gravity concentrators in conjunction with an Intensive Leach Reactor 3000BA (ILR) for intensive cyanidation of the gravity concentrate. The leach circuit comprises six 2,000 m³ leach tanks with oxygen injection and six1,000 m³ CIP tanks. CIP tailings gravitate to two 1,800 mm × 4,900 mm vibrating safety screens before being pumped to the tailings retreatment circuit. The total circuit residence time at high throughputs is approximately 72 hours. P a g e 98 | 136 The tailings retreatment circuit was originally installed in 1996 to recover sulphide locked gold that was not recovered in the leaching and CIP circuit. The CIP tailings stream is first de-slimed to remove light particles before gravity separation through spirals to recover the heavy fraction of the de-slimed stream. The gravity concentrate is further liberated by ultra-fine grinding before being returned to the head of the leaching circuit. The tailings retreatment circuit was upgraded in 2015 and included a complete replacement of all six spiral banks and an increase in the capacity of the spiral feed and tails pumps. The tailings retreatment circuit contributes approximately 2.5 % to the overall gold recovered. The refinery uses the pressure Zadra method to strip gold from carbon and an ILR for gravity concentrate. Gold is recovered in the electrowinning cells before being smelted. Carbon is regenerated in a kiln before being returned to the CIP tanks. Gold produced from the gravity circuit averages approximately 34 % of total gold produced with the leach circuit, including tailings recovery, producing the remainder. The gold sludge is washed and filtered from both the gravity and CIP electrowinning circuits. The sludge is further refined through smelting and crude doré is poured with the purity varying depending on the source. Gravity doré bars are approximately 90 % to 95 % gold whereas CIP doré bars are dependent on ore feed characteristics and can vary between 65 % and 80 % gold. The doré is dispatched to the Perth Mint refinery for further processing into gold bullion. Gold shipments occur on a regular basis to minimise gold stocks held on site. All gold shipments are conducted by a registered security company in a completely secure environment. All gold movements on-site are monitored and recorded by CCTV. Standard practice at the process plant is to ensure that all spillages are captured within bunds and are then hosed into sumps for pumping back into the process. There are four main areas for gold to collect outside the electrowinning/smelting and tailings streams: the gold room sump, strip solution tank, ILR sump pump and mill liners. The gold room sump and ILR sump pump are cleaned out monthly whilst mill liners are pressure cleaned back into the circuit when removed from service following a reline. The strip solution tank is usually cleaned on quarterly basis. Estimation of the exact amount of gold recovered during clean-up is difficult as the material is directly returned to the circuit without measurement unless it is collected and smelted separately. No gold is assumed to be locked up in the circuit or has been included in any metallurgical reconciliation. 14.2 Recent process plant performance The recent performance of the Granny Smith process plant is provided in Table 12.2.1. 14.3 Process plant requirements The Granny Smith plant has been upgraded several times over its current lifetime including the addition of a gravity circuit (Knelson concentrators and ILR), and the upgrade of the existing spiral sulphide recovery circuit. Plant management has an on-going program of structural steel and concrete refurbishment in progress. Leach and CIP tanks have a conditioning monitoring and refurbishment program required for compliance with the International Cyanide Management Code (ICMC). For treating the reserves life-of-mine’s ore extraction rate from Wallaby, the capacity of the existing plant significantly exceeds that which is required. The key process plant requirements estimated for the Mineral reserve LoM plan are summarised in P a g e 99 | 136 Table 14.3.1. These consumables quantities have been estimated using guidance from the 2022 Budget LoM, prorated based on plant feed mass. The number of plant employees required is in the range of 50 to 60 for the period 2022 through to 2025 where mill feed rates exceed 1.5 Mtpa. P a g e 100 | 136 Table 14.3.1: Granny Smith process plant – key requirements Unit 2022 2023 2024 2025 2026 2027 2028 2029 Ore Processed kt 1,639 1,724 1,570 1,190 1,232 921 1,039 1,101 Plant Power draw MWhr 58 61 56 46 47 39 42 44 Grinding Media t 1,139 1,198 1,091 827 856 640 722 766 Lime t 2,213 2,328 2,119 1,606 1,664 1,243 1,403 1,487 Sodium Cyanide t 485 510 464 352 365 272 307 326 Caustic t 401 421 384 291 301 225 254 269 Activated Carbon t 33 34 31 24 25 18 21 22 Hydrochloric Acid t 93 98 89 68 70 52 59 62 Source: Granny Smith CPR, 2021 14.4 Processing Risks 14.4.1 Major Equipment Failure Industrial mineral processing plants consist of a series of dedicated unit processes, e.g. crushing, grinding, leaching, carbon-in-pulp (CIP), and carbon elution. There is inherent risk associated with catastrophic failure of one (or more) of the key equipment items associated with these unit processes, whereby such failure could lead to a significant period of plant downtime until repairs are completed, resulting in the inability of the processing plan or forecast to be achieved and/or higher operational costs incurred than anticipated. Catastrophic failures could be associated with the structural, mechanical, or electrical components of the key processing equipment items. Key equipment items could include the crushers, grinding mills, or leach/CIP tanks. Risk minimisation activities to reduce the likelihood of such occurrences adopted by Granny Smith includes: Current plant steel and concrete monitoring and refurbishment program. Dedicated on-site maintenance department which undertakes condition monitoring activities, preventative maintenance, and repairs. Critical spares (e.g., spare mill motors and gearboxes). Contingency operational plans (e.g., contract/mobile crushing plant, Leach/CIP tank by-passing). Fire suppression systems. Insurances. Decisions associated with asset management, critical spares, insurances, etc. are outside the responsibility and accountability of the Qualified person, and some inherent risk and uncertainty associated with catastrophic failure of processing equipment remains. 14.4.2 Plant Operational Management The processing facilities are managed and operated by dedicated teams of personnel, who are required to make many operational and maintenance decisions every day. These decisions can directly impact the performance of the plant while processing the future ore reserves. For example, a decision to process ores at a higher throughput could result in a coarser grind size from the grinding circuit, resulting in a lowering of the plant recoveries. Similarly, the choice to operate the leaching circuit at lower free cyanide or dissolved oxygen concentrations to reduce consumables usage rates, could result in lower plant recoveries being achieved than anticipated.
P a g e 101 | 136 Plant management and the associated decisions made by plant operating personnel, are outside the responsibility and accountability of the Qualified person, and such decisions and actions taken by plant management can influence the achieved performance of the plant (e.g., throughput, costs, availability and recoveries). 14.4.3 Operating Costs, Plant Consumables and Reagents The operating cost of the processing plant represents a significant cost element to the overall financial evaluation of the reserve’s life-of-mine plan. The processing facilities use relatively large quantities of power, reagents and consumables, including fuels, cyanide, grinding steel media, lime, caustic, etc. The estimation of future processing costs is required as input into the cutoff-grade calculations and economic assessments of the reserves and resources. To estimate the processing costs, require assumptions to be made concerning consumables consumption rates, unit prices and inflation rates. Metallurgical testing undertaken on the future reserves, and recent plant performance, provides reasonable guidance of potential reagent consumption rates and mill throughput expectations, and this information is considered and reviewed by the plant metallurgist and the Qualified person. Granny Smith, like many other operating gold processing plants that have a reasonable operating history, do not allow for a discreet operating cost contingency in their future operating cost forecast. The absence of contingency is considered by the Qualified person as being a common and reasonable approach to operational process plant cost forecasting. Consumables, commodity pricing and inflation are subject to external influences that are outside the control or predictive capability of the Qualified person. Further to this, operational decisions made by plant management, or unexpected variances in the nature of the ores being processed could unexpectedly impact reagent and consumables usage rates. Such variances are outside the control or predictive expectations of the Qualified person. P a g e 102 | 136 15 Infrastructure Details on each major item of non-process infrastructure is discussed in this section. The site infrastructure layout is shown in Figure 3.3.1. The administration offices (including process engineering, environmental, safety, tailings facility construction management) and the process plant complex are located in the Granny Smith area. Other significant facilities in this area include: Reagent storage and mixing facilities. Process laboratory. Process maintenance and warehouse facilities. Main diesel fired power generation plant and substation. Fuel storage. Raw water tanks and reverse osmosis water treatment system. Process water storage pond. Accommodation camp. The mine administration offices (including the mine engineering, geology, mine safety, and training) are located at Wallaby. Other significant facilities in this area include: Mine equipment workshop. Mine warehouse. Core processing facilities. Paste plant. 15.1 Tailings storage facilities (TSF) Process plant tailings are thickened to a target slurry density of 65 % solids weight/weight in the tailings thickener. The final tailings slurry is pumped to the existing TSF complex via two-stage pumps. When required, hypersaline water from the Goanna pit is injected into the tailings slurry at the tailings pump box to maintain the total dissolved salts (TDS) above 50,000 ppm, which is deemed acceptable for cyanide code compliance as an alternative to cyanide destruction. The TSF comprises three upstream raised adjacent cells; Cell 1, 2 and 3. Cells 1 and 2 have a paddock geometry and have been used since early 1989 (Figure 15.1.1). Cell 3 is a hillside storage facility commissioned in 2002. Soil and Rock Engineering Pty Ltd completed the original design of Cell 1 and Cell 2 for Placer Dome in 1989 to a maximum embankment height of RL 437 m. In 1999, Knight Piésold submitted a report for a Works Approval application to increase the permitted height of Cell 1 to RL 448 m and Cell 2 to RL 448.5 m. Cell 3 was designed by KP and commissioned in 2002. The pond location is controlled by carefully depositing tailings from numerous deposition locations around the perimeter. Water is decanted through concrete ring gravity decant towers. In 2012 Granny Smith conducted a seepage collection trench and associated pumping facility downstream of the Cell 3 southern embankment. Its purpose was to reduce seepage and associated elevated groundwater levels in the area. P a g e 103 | 136 Figure 15.1.1: TSF overview Source: Granny Smith CPR, 2021 The TSF cells are appropriately managed. The current Engineer of Record is Golder Associates (Golder). Cell 2 is at full capacity, with the tailings within Cell 2 currently being remined. Cell 1 is the only operational cell with Cell 3 undergoing an embankment raise. In addition, there are numerous standpipe piezometers installed on the embankments of the decommissioned facilities, which are monitored to supplement other monitoring activities such as InSAR satellite audits, groundwater quality, vibrating wire piezometer data and seepage drain outflow measurements. Tailings are deposited around the perimeter wall of the TSF, which is mechanically raised to create further depositional area and maintain the minimum freeboard requirement. This method of raising involves borrowing coarse tailings from the beach for use in successive lifts. The supernatant pond in Cell 1 drains to a gravity decant system, and the Cell 3 facility comprises a gravity decant system and a series of underdrains. All three TSF cells have a consequence classification rating of High B in accordance with the ANCOLD 2019 guidelines. P a g e 104 | 136 The current elevations of the cells are: Cell 1was raised to the final permitted crest elevation of RL 448 m in late 2016. Cell 2 was raised to its final permitted crest elevation of RL 448.5 m in 2012. Therefore, this Cell is filled to its capacity. Cell 3 was raised to an elevation of RL 432.2 m in November 2018 (final permitted elevation of RL437 m). As of the end-Q3 2021: Tailing is now being deposited in Cell 1 Cell 2 is being used for the re-mining of tailings for underground backfill. Cell 3 at the end of Q3 2021 was offline, and construction has commenced on a top hat (or centerline) raise. The cumulative quantity of tailings deposited on the TSF complex until the end of December 2020 is ~90.3 Mt. Approximately 1.23 Mt of tailings were deposited on Cells 1 and 3 until the end of Q3 2021. Thus, the total cumulative quantity of tailings stored is ~91.53 Mt. The current life-of-mine tailings storage requirements is roughly 17.5 Mt. The tailings deposition strategy for the period between the end of 2021 and 2030 will be to manage tailings deposition between Cell 1, Cell 3 and the proposed new Cell 4. The current deposition schedule is summarised as follows: Cell1, deposition from October 2021 to May 2022 at a rate of 150 kt per month. Cell 3, deposition from June 2022 to February 2023 at 150 kt per month. Cell 4, construction from March 2022 to February 2023. Deposition split between Cell3 and Cell 4 from March 2023 to LoM. In 2019 a zone of soft and contractive tailings was identified in the bases of TSF Cell 1 and 2 that resulted in tailings deposition being suspended to those cells until the embankment stability could be re-assessed. Geotechnical investigations in 2020 confirmed that a rock buttress had to be installed at selected (southern) embankment locations on TSF Cells 1 and 2 to ensure that the post-seismic factors of safety met the minimum ANCOLD (2019) requirements. The rock buttress detailed design for Cell 1 was completed, and the buttress construction was completed in August 2021 (Figure 15.2.1). The buttress design for Cell 2 has commenced, and construction is due to start in Q1 2022. The Granny Smith TSFs must comply with the Global Industry Standard on Tailings Management (GISTM) in August 2025. A gap analysis has been completed, and the GISTM compliance program is underway in collaboration with the Engineer on Record (EoR). 15.2 Waste rock dumps At Granny Smith Mine waste rock is hauled from the underground mine and placed in the Wallaby Open Pit. It is expected that in 2025 the Wallaby pit waste dump will be exhausted and all waste rock will be hauled to the designated surface waste rock dump. Process plant tailings waste and waste rock are two of the most significant by-products produced by mines. By responsibly managing these waste streams, we can minimise their impact on the environment and our host communities.
P a g e 105 | 136 Figure 15.2.1: Cell 1 buttress Source: Granny Smith CPR, 2021 The following are the geotechnical design parameters for the in-pit waste dump geometry: Maximum bench height – 20 m. Maximum bench slope – 37 º. Minimum berm width – 10 m. Maximum haul road slope – 1:9. Haul road width – 20 m (15 m usable width + 5 m windrow). The waste disposal design consists of four Phases (Phase 1 to Phase 4) in four lifts of 20 m each with a total of 60 m height waste dump with an intermediate 5 m berms. 15.3 Water The Granny Smith fresh water supply is derived from the following sources: Mt Weld borefield Windich open pit void The Mt Weld borefield is classed as fresh groundwater, while the water from the former Windich open pit is sourced from groundwater recharge, rainfall and the diversion of Windich Creek. Both water sources are used as raw water or processed by reverse osmosis (RO) to produce potable water. Water used at the process plant is obtained from the Windich pit. Mt Weld bore water is sourced through existing regional groundwater supply agreements with Lynas (expires November 2023). Water exploration at the North Keringal area located within Granny Smith’s tenements has identified a potential replacement supply of 1 Gl – 2 Gl per annum supply. North Keringal Borefield, is under contraction with production bores, monitoring bores, roads and power lines scheduled for completion in Q1 2022. This water source will supply P a g e 106 | 136 up to 1 Gl of freshwater per year. An additional Stage 2 North Keringal Borefield is currently in planning phase and is expected to be able to supply an additional 1 Gl per year for Granny Smith. 15.4 Power Granny Smith’s power requirements are currently sourced from a gas-fired power station commissioned during 2016 and a hybrid power system, comprising more than 20,000 solar panels (7 MW capacity) supported by a 2 MWh/1 MWh battery system commissioned in 2020. The 24.3 MW power station is located approximately halfway between the process plant and Wallaby mine operation. Power is transmitted via a 33 kV overhead power line, with 11 kV feeding to underground via the portal and intake airway. 15.5 Accommodation The 950 room accommodation village is located 1.5 km west of the Granny Smith process plant and is managed by Sodexo. The village include a dry and wet mess as well as recreational facilities. 15.6 Site access Mine site access is dual lane elevated truck compacted roadways constructed from mining waste material connect the surface infrastructure. These roads connect the operating mines, infrastructure and residential camp. 15.7 Other infrastructure Other infrastructure on site includes. Paste Plant. Core Yard/ Office. Contractors Yard. Dams and turkey nests. Fuel storage facilities. Workshops and laydown areas. Landfill Site. Administration and training facilities. Airstrip. A Solar Farm. Wastewater treatment plant. Vehicle wash down bays. Bioremediation Pad. Communication towers. Pipeline corridors. P a g e 107 | 136 Figure 15.7.1: Plan of Wallaby and Granny Smith infrastructure Note: a) The Qualified person is of the opinion that the infrastructure for the Granny Smith mining operation is fit for the life-of-mine reserve estimation and that the Mineral reserve quantities are tested against dump and disposal capacities. The tailings disposal has had a study completed to facilitate the in- pit deficit. b) The Qualified person is of the opinion that the infrastructure for the Granny Smith mining operation is fit for the life-of-mine reserve estimation and that the Mineral reserve quantities are tested against dump and disposal capacities. Source: Granny Smith CPR, 2021 P a g e 108 | 136 16 Market studies 16.1 Preliminary market study A review of metal prices for planning purposes is undertaken annually to monitor any significant changes in price trends or exchange rates that would warrant re-calibrating the price deck before the Strategic Planning process transitions into the Business Planning cycle. This review of the metal price deck has taken account of the prevailing economic, commodity price and exchange rate (Fx) trends, together with market consensus forecasts, in addition to consideration of the Gold Fields’ strategy and expectations for the operations. Our strategy is to (1) mitigate annual volatility by holding planning metal prices as long as warranted to support stability in mine planning, notably regarding the underground MSO and open pit shell selections; (2) maintain appropriate margins on spot and long-term price forecasts to support the Group’s BSC metrics; (3) protect against accelerating mining sector inflation and, (4) to confirm a separate gold price to be used specifically for the Operational Pan (budget) revenue streams and cashflows in Q3 each year. The outcome of the pricing analysis was to use a gold price of $1,300/oz for Mineral reserves and $1,500/oz for gold Mineral resources for the December 2021 disclosure of estimates. The relevant copper and silver prices in US Dollars are shown in the summary table below. Note the A$/oz and ZAR/kg gold prices applied to the estimates in Australia and South Africa are included for transparency. Table 16.1.1: Reserve and Resource metal prices Units December 2021 Metal price Deck Metal Unit Mineral Reserve 31 Dec 2021 Mineral Resource 31 Dec 2021 Gold $/oz 1,300 1,500 A$/oz 1,750 2,000 Source: Granny Smith CPR 2021 The above price deck comparison to market long-term forecasts assessed at the time of analysis is consistent with the Registrants approach to retaining good discipline in support of the Company strategy; this approach ensures Gold Fields’ Mineral resources and reserves are not too volatile year-on-year and that the company is protected against possible downside scenarios if the gold price falls up to ~25 % in any specific year. Ensuring sufficient flying height to maintain our margins at prices that could be incrementally lower than the spot price ranges seen in 2021 is also important. Equally, with annual mining sector inflation estimated at $30-40/oz, we need to ensure we mitigate this escalation risk in the life-of-mine plans and Mineral reserve estimates. Sensitivity analysis on gold price for project financial evaluation is done to provide flexibility/range analysis for all regional studies and site growth opportunities and investment purposes. The Mineral resource gold price premium to the Mineral reserve price is circa 15 % and the differential is in general alignment to our peer group and industry standard practice. The Mineral resource price premium is to provide information on each operation’s potential at higher gold prices and to indicate possible future site infrastructure and mining footprint requirements. All gold produced at Granny Smith is refined by the Perth Mint in Western Australia. The Perth Mint applies competitive charges for the collection, transport and refining services. The Perth Mint takes responsibility for the unrefined gold at collection from the operation where it engages a sub-contractor, Brinks Australia. Brinks delivers the unrefined gold to the Perth Mint where it is refined, and the refined ounces of gold and silver are credited to the relevant metal accounts held by the operating company with the Perth Mint. The contractual arrangement with the Perth Mint continues until terminated by either party upon 90 days’ written notice.
P a g e 109 | 136 Gold Fields’ treasury department in the corporate office in Johannesburg, South Africa sells all the refined gold produced by the operating company. On collection of the unrefined gold from a mine site, the relevant operating company will notify Gold Fields’ treasury department of the estimated refined gold content, expressed in troy ounces, available for sale. After such confirmation, the treasury department sells the refined gold to authorised counterparties at a price benchmarked against the London Bullion Market Association PM gold auction price. All silver is sold to the Perth Mint at the London Bullion Market Association silver price on the last business day of each month. Gold Fields may periodically use commodity or derivative instruments to protect against low gold prices with respect to its production. Variations in gold price, currency fluctuations and world economics can potentially impact on the revenue received. No derivative instruments are in place at the date of this report. The majority of gold production is used for jewellery and for investment purposes, in the latter case because the market views it as a store of value against inflation. In addition, certain physical properties of gold, including its malleability, ductility, electric conductivity, resistance to corrosion and reflectivity, make it the metal of choice in a number of industrial and electronic applications. Supply of gold consists of new production from mining, the recycling of gold scrap and releases from existing stocks of bullion. Mine production represents the most important source of supply, typically comprising 75 per cent. each year. Annual demand requires more gold than is newly mined and the shortfall is made up from recycling. Management believes that long-term gold supply dynamics and global economy trends will support the gold price at levels above or aligned to $1,300 per ounce in the long-term. The market for gold is relatively liquid compared to other commodity markets, with London being the world’s largest gold trading market. Gold is also actively traded via futures and forward contracts. The price of gold has historically been significantly affected by macroeconomic factors, such as inflation, exchange rates, reserves policy and by global political and economic events, rather than simple supply/demand dynamics. Gold is often purchased as a store of value in periods of price inflation and weakening currency. The price of gold has historically been less volatile than that of most other commodities. Significant service contracts and/or leases that are in place to enable execution of the life-of-mine plan include: Perth Mint - Refining Barminco - Mining & Drilling MLG – Ore Haulage Coastal Midwest Transport - Freight haulage RUC Cementation – Raise boring APA Operations – Gas Transportation EDL – Power supply Alliance Airlines – Flights Action Industrial Catering – Camp Services ALS Global – Assay Services The Qualified person has relied on information provided by the Company in preparing its findings and conclusions regarding market studies related to gold sales from Granny Smith. Refining services are based on well-established long-term agreements and expediting gold sales over the life of the asset does not represent any significant uncertainty. Service contracts, lease agreements and goods contracts e.g., diesel, cyanide and cement, necessary to develop the property as planned, are in place and have the capability to support the full projected cashflow period. P a g e 110 | 136 16.2 Metal Price history Gold prices London Metals Exchange afternoon close: Gold spot 30 December 2021 - $1,805.85/oz - A$2,484.32/oz Fx 30 December 2021 A$1:$0727c Gold spot 24 month average - $1,784.45/oz Gold spot 36 month average - $1,653.71/oz Gold spot 60 month average - $1,497.48/oz P a g e 111 | 136 17 Environmental studies, permitting, and plans, negotiations, or agreements with local individuals or groups Climate change is an integral part of the Mineral reserve generation process and incorporating relevant costs associated with climate change, primarily decarbonisation, mitigation and adaptation to the changing climate, is a key theme for the Company. Integration of these key elements into the Mineral reserve process is being carried out progressively and simultaneously across all of Gold Fields’ sites. 17.1 Permitting Mining operations on tenements in Western Australia must be developed and operated in compliance with the following Commonwealth and State environmental legislative requirements. 17.1.1 Commonwealth The Environmental Protection and Biodiversity Conservation (“EPBC”) Act 1999 is administered by the Department of the Environment, Water, Heritage and the Arts. Commonwealth approval is required for matters of national significance, as defined in the Act. Matters of national significance include the presence of migratory birds, federally listed rare flora or fauna, Commonwealth land, nuclear actions and marine areas. A new mine located on or with impact to Lake Carey may require Commonwealth approvals under the EPBC Act. Currently, the Clean Energy Regulator oversees the administration of the Large-scale Renewable Energy Target and the Small-scale Renewable Energy Scheme to encourage additional generation of electricity from renewable energy sources. The Renewable Energy Target legislation provides an incentive for investment in renewable energy power stations and smaller systems while ensuring the energy sources used are ecologically sustainable. The Clean Energy Regulator Act, 2011 regulates and convenes the Clean Energy Regulator. The Carbon Farming Initiative is a voluntary carbon offsets scheme. It is an integral component of the Emissions Reduction Fund and allows land managers to earn carbon credits by changing land use or management practices to store carbon or reduce greenhouse gas emissions under the Carbon Credits (Carbon Farming Initiative) Act 2011. The National Greenhouse and Energy Reporting Act 2007 sets out the reporting framework for calculating carbon emissions from industry. National Greenhouse and Energy Reporting will form the basis for calculating permits under any proposed Carbon Pollution Reduction Scheme to be introduced into Australia in the future. 17.1.2 State The Mining Act (1978) is administered by the Department of Mines, Industry Regulation and Safety (DMIRS). Before commencement of any mining operation, a proponent is required to submit a Mining Proposal to the DMIRS. The Mining Proposal describes the project, surrounding environment, potential environmental impacts and proposed prevention and mitigation measures. Commitments made within the Mining Proposal are binding on any future operations within the tenements unless a request for an amendment to the relevant Government authorities is accepted. The DMIRS advised in late 2019 that enforcement of the Statutory Guidelines for Mining Proposals and the Statutory Guidelines for Mine Closure Plans would be met in February 2020. The submission of Mining Proposals is being conducted in accordance with the new guidelines. The Environmental Protection Act 1986 is administered by the Department of Water and Environment Regulation (DWER) and Office of the Environmental Protection Authority (OEPA). There are two key components to the EP Act that affect Granny Smith’s operations. Under Part IV of the EP Act, projects referred to the OEPA which are considered likely to have a significant environmental impact may be subject to assessment in accordance with Environmental Impact Assessment, Part IV Division 1. The environmental impact assessment (EIA) of development proposals is undertaken in accordance with Part IV Division 1 of the EP Act and the Environmental Impact Assessment (Part IV Divisions 1 and 2) Administrative Procedures 2016. The DWER regulates industrial emissions and discharges to the environment through a Works Approval and licensing process under Part V of the EP Act. Industrial premises with potential to cause emissions and discharges to air, land or P a g e 112 | 136 water are known as “prescribed premises” and trigger regulation under the EP Act. Prescribed premises categories are outlined in Schedule 1 of the Environmental Protection Regulations 1987. The EP Act requires a Works Approval to be obtained before constructing a prescribed industrial premise and makes it an offence to cause an emission or discharge unless a licence or registration is held for the premises. On completion of construction of such infrastructure, completion certificates are required to be submitted to DWER to confirm the infrastructure was constructed in accordance with approved design criteria. In addition, the Contaminated Sites Act 2003 (administered by DWER) has environmental investigation and reporting requirements required by mining operations under this legislation. The Environmental Protection (Clearing of Native Vegetation) Regulations 2004 (administered by DMIRS and DWER) was gazetted in 2004 as part of amendments to the Environmental Protection Amendment Act (2003). It requires all individuals, corporate bodies and private companies to gain formal approval for vegetation clearing in Western Australia prior to any ground disturbing activities commencing. All disturbances relating to mining, processing and related infrastructure require approval under both this framework (including clearing permit exemptions) as well as under the Mining Act. The Rights in Water and Irrigation Act 1914 as administered by DWER are responsible for issuing groundwater licences (GWL) and licences to construct or alter wells (CAW). There is no legal obligation in Western Australia to have unconditional performance bonds in place for mine closure liabilities. Such liabilities for continuing operations are now self-funding. In addition, companies are required to pay a levy to the state based on the total mine closure liability. This levy is 1 % of the total liability per mine, paid annually. This levy goes into a state administered fund known as the Mine Rehabilitation Fund. Capital and interest from the fund will be used to rehabilitate legacy sites or sites that have prematurely closed or been abandoned. 17.1.3 Granny Smith permitting Granny Smith is entitled to mine within its tenement holding in accordance with all necessary statutory authorisations and permits. The Wallaby open mine was approved in August 2000 under Part IV of the EP Act in accordance with Ministerial Statement (Reference #551). In August 2017, the OEPA conducted an audit on the Ministerial Statement which recommended “no action taken” as Granny Smith had demonstrated compliance to the conditions of Ministerial Statement 551. Separate to the existing Part IV approval (Ministerial Statement 551), additional small surface projects such as paste fill, the batch plant and causeways required additional approvals and operational commitments through State environmental regulators (DWER and DMIRS). Currently, Granny Smith operates the Wallaby underground mine in accordance with the Wallaby Deeps Mining Proposal (REGID 36911, 2012) that describes the project as ‘all future mineable reserve – lateral and deeper’, within the Wallaby mine. Approvals for abstraction and discharge to Lake Carey from the Wallaby mine was obtained in two parts: Abstraction: GWL 100054(7) for 13 Gl per annum. Discharge to Lake Carey: Environmental Licence L8435/2010/3 for 10.2 Gl per annum. Current water abstraction levels are around 7 Gl per annum (total) based on the lower annual production rate which is comparable to the annual production rates for the remainder of the mine life. DWER Licence L8435/2010/3 was last amended on 7 March 2019 to include: The addition of discharge to land monitoring for the Wallaby Anti-Pollution (WAP) pond. Production capacity increase for category 52. Changes to the wastewater treatment plant (WWTP) monitoring requirements.
P a g e 113 | 136 Two additional landfill locations. Amendment to the landfill cover requirement. Addition of Special Waste Type 1 (asbestos) to category 64. Water transfer pond containment upgrade. Addition of mining tenement M38/361 to the Premises Boundary. DWER Licence L8435/2010/3 was amended on the 12 April 2021 with only administrative corrections. Granny Smith also holds groundwater abstraction licences GWL65744 Granny Smith and GWL59529 Mt Weld which allows the annual abstraction of 15 Gl and 1.2 Gl of water. Groundwater monitoring is conducted regularly as part of the groundwater well licences operating strategy, licence conditions, tenement conditions and Mining Proposal commitments. These programs monitor groundwater levels and water quality at the borefields, mines and around the TSFs. A summary of major current Granny Smith permits is provided in Table 17.1.1. Table 17.1.1: List of Granny Smith permits Number Purpose Registered holder Status Grant date Expiry date Fines L8435 GSM EPA 1986 Licence GSM Mining Company Pty Ltd Active 07/10/2013 06/10/2034 0 MS 551 Wallaby Ministerial Statement Placer (Granny Smith) Pty Limited Active 9/08/2000 - 0 GWL65744 Groundwater Licence GSM Mining Company Pty Ltd Active 2/02/2014 27/02/2024 0 GWL59529 Groundwater Licence GSM Mining Company Pty Ltd Active 2/10/2017 3/10/2027 0 GWL100054 Groundwater Licence GSM Mining Company Pty Ltd Active 7/11/2016 27/02/2024 0 Source: Granny Smith CPR, 2021 17.2 Environmental studies Environmental, ecological and social impacts are managed in accordance with existing regulatory instruments and GSM’s internal ISO 14001 management system. Gold Fields has developed a Group Environmental Policy Statement, which describes the key principles of how the sites and employees perform their work and how the Company supports its employees in minimising the operations impact, continual improvement and compliance with laws and other obligations. Granny Smith operates in compliance with relevant legislation (including DWER Environmental Licence L8435 and Mining Act approvals) and remains compliant regarding key environmental risks, namely tailings storage facilities, processing of ore, land disturbance, chemical blending and storage, electric power generation, sewage and landfill operations and mine dewatering. These and other potential environmental impacts are assessed during the approvals process and are regularly reviewed as part of the site Aspects and Impacts Register and ISO14001-certified Environmental Management System. There are no environmental sensitive area receptors at risk near Granny Smith. Threatened and priority ecological communities, flora and fauna areas are mapped and assessed during the internal surface disturbance approval process and external regulator environmental clearing/disturbance approvals. 17.3 Waste disposal, monitoring and water management Monitoring programs and reporting that are in place include: Quarterly and annual groundwater and surface water monitoring. Annual groundwater abstraction and aquifer reviews. P a g e 114 | 136 Annual groundwater discharge reporting. TSF audit reviews. TSF groundwater seepage management. Annual vegetation impact monitoring. Annual Lake Carey fringing vegetation in the vicinity of Wallaby mine monitoring. Annual biological assessment of Lake Carey within the Wallaby area. 17.3.1 Tailings storage facilities (TSF) Freeboard Each tailings cell is at full capacity when the tailings operating freeboard reduces to 300 mm. The operating freeboard is the vertical distance between the upstream embankment crest and the head of the tailings beach. The DWER licence conditions restrict the maximum supernatant pond area to 15 % of a Cell's top surface area. The available freeboard (as of September 2021) for each TSF is adequate and in compliance with the DMIRS criteria. The EoR has estimated that the available storm storage capacity for each Cell exceeds the run-off volume for the Probable Maximum Precipitation (PMP) event superimposed on the operating pond. Stability Laboratory testing of samples recovered during the field investigations is substantially completed, and the results of the studies have been used to interpret and fully characterise the TSF foundation and tailings materials properties. Zones of low strength and loose contractive materials were identified within the tailing's deposits, particularly at their base on the cells' downstream (southeast) side. Limit equilibrium stability assessment identified the need for buttressing along the southeast side of Cell 1 to facilitate an increase in the factor of safety against potential failure associated with strain softening and/or static or dynamic liquefaction of the tailings. No signs of instability have been evident on Cell 1 and Cell 2; nevertheless, factors of safety were substantially below the minimum required for post-seismic loading, adopting the measured post-peak/residual shear strength properties. On advice from the EoR, a downstream buttress was designed for Cell 1 to improve geotechnical stability and satisfy the required factor of safety conditions. Golder completed the static and dynamic numerical modelling for Cell 1, which refined the preliminary limit equilibrium stability assessment and allowed the optimisation of the buttress geometry from the maximum elevation of the crest being RL 433 m (preliminary design) to RL 429 m in the southern corner of Cell 1 and RL 426 m along the remaining extension of Cell 1. The next step will be to undertake similar static and dynamic numerical modelling for Cell 2. Based on the Cell 1 analysis outcomes and the Cell 1 buttress completion, approval to recommence tailings deposition into Cell 1 was received from DMIRS. Groundwater Monitoring Groundwater levels in the shallow unconfined aquifer and deeper saline aquifer beneath the TSF area are measured in a network of monitoring bores around the TSF perimeter. Pre mining water levels in the shallow aquifer were approximately 10 m below ground level. However, the development of groundwater mounding occurred beneath the TSF in the early 1990s, and a series of measures to manage seepage from the TSF have been implemented over the operating life of the mine, including: Installation and operation of a thickener to increase the tailings solids concentration. P a g e 115 | 136 Construction of Cell 3 and alternation of deposition between cells to increase drying periods. Installation and upgrades to a shallow seepage collection system (trenches and sumps). Installation of seepage recovery bores between Cell 3 and Childe Harold Creek. Some of the bores have been destroyed or decommissioned during ongoing construction activities. Quarterly water level readings are taken in 29 selected bores in accordance with the DWER operating Licence. An additional 11 bores are monitored annually. During the recent Cell 1 buttress construction, the bores (7 No) at locations MB 13, 14, 15 and 28 were decommissioned and grouted. MB 13 is one of the bores that was monitored quarterly and was the only one located next to Cell 1. This bore will require replacement. Water levels in the bores remained relatively stable during Q3 2021, generally at depths between 1 m and 8 m. MB 57 is located on the hillside on the northwest flank of Cell 3 at a higher elevation than the other bores water depth is approximately 11 m. The drop in water level at MB 50 since June 2018 is due to its proximity to seepage recovery bore PB3A, which draws water down to approximately 22 m. Tailings Discharge WAD Cyanide levels Due to the potential use of hypersaline process water at Granny Smith, site-specific International Cyanide Management Code (ICMC) WAD CN levels are set for tailings discharge. The maximum weak acid dissociable (WAD) cyanide discharge concentration limit to the TSF is 83.3 mg/L with an 80th percentile concentration of 71.7 mg/L. These limits apply under hypersaline conditions (tailings discharge greater than 50,000 mg/L total dissolved solids (TDS)). Where conditions are not hypersaline, discharge concentrations of WAD cyanide are limited to 50 mg/L. The operating strategy at Granny Smith is to maintain the WAD level below 50 mg/l to avoid the addition of hypersaline water due to operational concerns. These guidelines were recently re-approved by the International Cyanide Management Institute (ICMI) for recertification purposes. The WAD level in tails discharge did not exceed these limits during Quarter 3 of 2021. Embankment Movement Granny Smith has 12 existing survey pins installed in the Cell 1/3 dividing embankment to check for embankment movement. In addition, survey pins were installed in the Cell 1 eastern embankment in Q1, 2019. The survey pins indicated minimal movement and monitored displacements were confirmed by the EoR to be negligible. The quarterly InSAR scans detected no embankment settlement or movement. Instrumentation The ML suite database from Canary is online and receiving and recording the readings from the piezometers currently connected to the telemetry system on the TSFs. Golder is reviewing the instrumentation readings weekly. No abnormal or upset conditions were identified since the commissioning of the online cloud-based dashboard system in late 2020. Audits and Inspections Golder conducts quarterly TSF inspections and interrogates monitoring data weekly. The next third-party audit is due in Q2 2022. SRK Consulting has been appointed as the senior independent reviewer to conduct technical reviews on key studies and assessments. The TSF s at Granny Smith are well managed from a facility safety and governance perspective. a) The Qualified person has the opinion that the procedures and monitoring, water management practices are adequate for the life-of-mine reserve estimate. 17.3.2 Waste rock dumps Waste rock management is conducted in accordance with the Wallaby Project Waste Dump Management Plan (Ministerial Statement 551), Mining Act tenement conditions (including Wallaby Deeps Mining proposal REGID P a g e 116 | 136 36911) and DWER Environmental Licence (L8435). The two approved locations are the in-pit Wallaby dump and the surface waste rock landform on the western side of the pit. Current estimates show that Wallaby in-pit dumping will reach its limit in 2025. From this time onwards, all waste from Wallaby will be dumped on the surface waste dump. Parameters for utilising the surface waste rock landform are detailed in the Wallaby Project Waste Dump Management Plan (Ministerial Statement 551). Although capacity remains to dump more waste rock at the surface facility, final mine closure and rehabilitation costs could be reduced by maximising the amount of material dumped into the Wallaby open pit. As part of the environmental due diligence for the TSF Cell 1 buttress construction, a review of the Wallaby rock characteristics was undertaken. The findings were: Recently mined waste rock material collected from the base of the pit consisted of fresh conglomerate. If the Wallaby waste rock was to be utilised as construction material, this material has minimal impact to the environment in respect to acid mine drainage. Geological core logging of waste material below the Zone 120 level is consistent with historic sampling and acid mine drainage classification. Geological logging records show an absent to trace occurrence of sulphides (typically pyrite) with neutralising carbonate frequently present in veining and alteration. As the mine gets deeper, ongoing assessment of waste rock characterisation is recommended to further supplement both the EGi, 2000 report and the Zone 110-120 feasibility study report. GSM conducts annual waste rock dump monitoring; Rehabilitation Performance Monitoring Protocol (RPMP). The RPMP leverages technological advancements in data capture and processing in the science of remote sensing to assess rehabilitation performance at a landscape scale, as well as field-based monitoring and observations designed to collect detail on fine-scale features that are immeasurable by remote sensing. This information is used to develop any further rehabilitation requirements which is integrated in the Closure Cost Estimate and GSM closure related rehabilitation planning. a) The Qualified person is of the opinion that the waste rock dumps at Granny Smith are adequate for this life-of- mine reserve plan. Regular waste rock inspections are performed to assess safety. 17.3.3 Water management The Wallaby borefield has been operating since late-April 2001 due to the presence of aquifers formed by the paleochannel and local permeable fractured rocks. The mine is dewatered using ex-pit production bores (the Wallaby borefield) and sumps from both in-pit and underground. There are two active discharge outfalls on Lake Carey located on either side of the Wallaby mine, referred to as the western discharge outfall (DWER water emission 1 or W1) and the southern discharge outfall (DWER water emission 2 or W2). Groundwater is pumped to either a transfer pond to allow sediment retention and then to the southern discharge outfall, or directly from the production bores (clear water) to the western discharge outfall. There is also an eastern discharge outfall to the Granny Smith open pit, which while constructed and commissioned, remains inactive with environmental application approvals currently pending and under assessment by DWER. All water abstraction and discharge are fully permitted and compliant with the legal obligations and limits. One of the most important components of the Granny Smith operation is the management and continuous monitoring of hypersaline water. In 2000, a Lake Carey Catchment Management Group (LCCMG) was formed. The LCCMG acts as a coordinating body to oversee and fund environmental monitoring and research and is a critical factor in maintaining compliance approvals associated with the management of hypersaline discharge from the Wallaby underground mine onto the salt lake. Following a major flood event in 2012, consultancies involved in past research were commissioned to produce a document that summarised the findings of past studies into a single, scientifically robust document. The final report
P a g e 117 | 136 was submitted to the DWER in 2014. The LCCMG actively manages the cumulative impact to the lake and continues to build knowledge and safeguard environmental dewatering/discharge approvals. Major flood events contribute to the dilution and dispersal of salts and metals that are usually associated with discharge in dry conditions providing temporary mitigation. However, it is unknown if the continued addition of salts to the lake over time will eventually result in a shift towards a less abundant and diverse, more salt-tolerant biological assemblage. To promote the recovery of lake ecology adjacent to the discharge points, alternative discharge points will be considered for short periods (2 - 4 weeks) during significant flood events (e.g. former Keringal and Granny Smith pits). In 2019, an application for a Works Approval/licence amendment was submitted to DWER regarding the dewatering of Goanna and Granny Smith pit complex (~20 GL) and the discharge to Lake Carey. The regulator requested further information regarding ecotoxicity of the discharge and GSM has since requested two extensions up to December 2021 to respond. This application was subsequently withdrawn by GSM. In 2022, an application is planned to be finalised, with further studies (environmental and technical) scheduled including: Closing the knowledge gaps identified during the current studies. Further alignment to the weights of evidence approach to better understand the stressors on the ephemeral and hypersaline Lake Carey receptors. Determine and refine the best environmental management options (water treatment). The former Windich, Jubilee and Phoenix open pits are inundated with natural groundwater inflows, direct rainfall and diverted stream flow. In addition, the Keringal pit provides potential future storage capacity and was instrumental in providing a disposal location for ongoing Wallaby discharge since dewatering began. Although the Keringal pit is currently inundated with hypersaline groundwater and utilised for emergency discharge from the Wallaby mine, opportunities may allow use for usable water storage in the future. In 2020, GSM updated the site water balance and reviewed the Regional Water Management Plan. This included a review of the LoM water consumption requirements, optimised water use, underground water cycle, harvesting of water and water infrastructure. In 2021 GSM established a Site Water Working Group and continues to review water demand, supply and opportunities for water reduction and reuse. As per GSM’s EPA Licence (L8435) and three Groundwater Licences, an array of water monitoring and analysis is undertaken on a monthly, quarterly and annual basis. a) The Qualified person is of the opinion that the water balance and procedures are adequate and support the life-of- mine reserve estimate. 17.4 Social and community The Indigenous Peoples Strategy provides the framework for a consistent approach to engagement with Aboriginal peoples to improve relationships and mitigate risks to the business. Through the implementation of a its Reflect Reconciliation Action Plan (RAP), Gold Fields’ sites are developing appropriate strategies to improve and increase Aboriginal employment outcomes within its workplaces and increase supplier diversity. In 2019, a claim under the Native Title Act 1993 (Cth) by the Nyalpa Pirniku People (WAD91/2019) was registered. This claim covers the entire Granny Smith mining operations. The registered claim is still under consideration by the Federal Court. In May 2021 GSM signed a Heritage Agreement with Nyalpa Pirniku, which covers cultural heritage management processes for exploration and prospecting tenure. GSM consults with relevant Aboriginal stakeholder groups (including the Nyalpa Pirniku People) to ensure that areas of Aboriginal cultural heritage are identified and recorded. The sites identified during cultural heritage surveys are either archaeological (e.g. flake scatter artefacts) or ethnographic (e.g. an area linked to a story line). Such sites are recorded and managed in accordance with the Aboriginal Heritage Act (1972) (WA) under site and regional procedures and standards. P a g e 118 | 136 Stakeholder engagement is guided by an internal plan and Gold Fields’ Stakeholder Relationship and Engagement Policy. Granny Smith supports community development initiatives which add value to the host community. GSM pursues host community procurement and employment. 17.5 Mine closure Granny Smith has an up-to-date mine closure plan, approved by DMIRS in 2021. The plan has been developed in accordance with legal requirements and Gold Fields guidance, which aligns with the International Council of Mining and Minerals (ICMM) guidance The Mine Closure Plan determines the mine closure requirements and calculates the financial or closure cost liability associated with closure. The Mine Closure Plan identifies the baseline description, the closure vision or objectives, risks and opportunities, and closure activities, which include stakeholder engagement, decontamination, dismantling, re-profiling and revegetation of land or landforms, maintenance and monitoring, including post closure water monitoring (after rehabilitation is completed). The operation has a Progressive Rehabilitation Plan (PRP), developed in accordance with the approved Mine Closure Plan and Group guidance. The operation sets annual targets for the implementation of the PRP and tracks their performance against these targets. These include the recent TSF Cell 1 buttress constructed for long term stability and safety purposes, rehabilitation of the Windich North and Windich South waste rock landforms, and technical studies such as waste rock landform erosion modelling for closure purposes. Monitoring of closure objectives is undertaken utilising an in-house Closure Monitoring Protocol. Monitoring data and results are reported annually as part of Granny Smith’s Annual Environmental Report. Existing cash resources are utilised to fund the progressive rehabilitation activities. Granny Smith, as a tenement holder, is required to report disturbance data, and to contribute annually to the Mining Rehabilitation Fund (MRF) in accordance with the requirements of the Mining Act. Granny Smith have developed their closure cost estimate using the Standardised Reclamation Cost Estimator (SRCE) model. Closure costs are reviewed every year to reflect actual and proposed disturbances and changes in closure requirements. The estimated closure cost for life-of-mine is calculated, as of 31 December 2021, as $66 m (excluding taxes). Financial provision for rehabilitation, closure and post closure obligations are met through existing cash reserves. The SRCE closure cost estimate, developed for asset retirement obligation purposes, is updated and reviewed, externally, every two years by an independent consultant, and reviewed annually as part of the Group financial assurance. Provide the Qualified person's opinion on the adequacy of current plans to address any issues related to environmental compliance, permitting, and local individuals or groups: a) The Qualified person is of the opinion that the licenses are in good standing and that any current or future licensing can and will be obtained for the Mineral reserve or the Mineral resource. b) The Qualified person is of the opinion that Granny Smith has a good standing with licensing authorities, community groups and that licensing is not expected to be material to reserves or resources. c) Granny Smith is conducting progressive rehabilitation, as part of good practice and to reduce their closure liability. d) The Qualified person is of the opinion that the closure estimates and duration are reasonable and practical. P a g e 119 | 136 18 Capital and operating costs 18.1 Capital costs Capital costs for Granny Smith include equipment replacement, underground mine development costs, infrastructure upgrades, process plant integrity and other minor expenditures to maintain operations. Major budgeted capital cost items include underground development, ventilation, dewatering, power, escapeways, exploration, TSF construction and expansions. The forecast capital costs for the Mineral reserve LoM plan are summarised in Table 18.1.1. Table 18.1.1: Capital costs ($ million) Capital cost item Units 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 Mining MP&Dev $ million 48.7 31.7 24.2 8.8 15.9 15.9 12.9 10.8 18.9 3.2 2.7 Mining Capital Works $ million 23.0 30.6 14.7 11.2 4.2 8.0 3.1 3.6 0.2 0.1 0.0 Processing (including TSFs) $ million 12.9 9.2 6.0 2.7 3.3 0.1 3.4 3.5 3.4 0.0 0.0 G&A Capital $ million 2.4 2.9 6.4 1.5 1.5 1.0 0.5 0.3 0.2 0.1 0.0 Exploration $ million 8.4 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 Capital $ million 95.4 74.9 51.9 24.8 25.4 25.7 20.5 18.7 23.3 4.0 3.3 Notes: a) The capital costs are based on the 31 December 2021 life-of-mine schedule for proven and probable reserves. a) No inferred Mineral resource is included in the life-of-mine processing schedule or techno-economic evaluation. b) Exploration costs are limited to year one in the life-of-mine cashflow model. Gold Fields is expecting to spend between $80 million and $100 million per annum on reserve generation exploration to replace depletion with approximately a quarter share going to Granny Smith. c) Closure cost is 'Day of Assessment' as at 31 December 2021 with subsequent life-of-mine disturbance rehabilitation added. d) Tailing storage facilities are costed according to the life-of-mine requirements. The current in-pit tailings storage facility is expected to have reached capacity before the reserve life-of-mine is consumed. The cost of the replacement facility is included in the life-of-mine financial model. Source: Granny Smith CPR, 2021 18.2 Operating costs The 2021 Reserve LoM operating costs are based on the 2022 budget unit costs. In cases where there is an expected change in operating practice in the mine that will have a material effect on costs, these expected changes have been incorporated into the cost estimates. Budgeted operating costs for the 31 December 2021 Mineral reserve LoM plan are summarised in Table 18.2.1. Table 18.2.1: Operating costs ($ million) Operating cost item Units 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 Mining $ million 113.5 124.7 117.8 98.3 104.4 87.2 92.6 96.5 76.6 57.8 51.9 Processing $ million 34.6 33.6 32.6 26.5 26.8 21.3 25.1 25.7 21.4 18.9 18.6 G&A Operating $ million 41.5 39.4 38.9 32.3 31.5 26.0 26.3 26.4 21.4 17.3 16.3 Other operating costs $ million 5.5 5.6 5.2 4.0 4.1 3.1 3.5 3.7 3.2 2.2 1.9 Operating costs $ million 195.2 203.3 194.6 161.1 166.9 137.5 147.5 152.2 122.6 96.3 88.7 Notes: a) The operating costs are based on the 31 December 2021 life-of-mine schedule for proven and probable reserves. The Mineral resource and exploration required to replace depleted reserves is no included in this techno-economic assessment. b) No inferred Mineral resource is included in the life-of-mine processing schedule or techno-economic evaluation. c) Costs are first principles based on the Mineral reserve life-of-mine schedule. d) This operating cost summary estimate is for the Mineral reserve life-of-mine schedule. e) The operating costs also include rehabilitation and closure costs of $56.1 million. Source: Granny Smith CPR, 2021 P a g e 120 | 136 Budgeted closure costs post the 31 December 2021 Mineral reserve LoM plan are summarised in Table 18.2.2. Table 18.2.2: Post LoM costs Sources Units 2028 2029 2030 2031 2032 2033 Onwards Post Reserve LOM Closure $ million 0.1 18.6 26.6 6.2 1.3 3.3 Property Holding Costs* $ million 2.7 Notes: * Costs included in closure costs Source: Granny Smith CPR, 2021 The Qualified person’s opinion on capital and operating costs is summarised below: a) The financial schedule is wired to the life-of-mine plan to ensure the provision of capital is linked to when the major budgeted items require to be funded. b) The capital, operating and closure cost estimation levels of accuracy meet the minimum pre-feasibility study requirements at an estimated accuracy of ±25 % and require no more than 15 % contingency. The specific engineering estimation methods have an accuracy equal to or better than this range. c) Granny Smith has improved capital estimation and capital delivery through the application of Group Capital Standards and capital projects review by a select team with improved implementation planning. Gold Fields also perform post investment reviews across all major capital studies and share key learnings. d) Gold Fields’ two-year business planning cycle captures operating and capital costs along with key physicals and revenue. The business plans are internally reviewed, presented to the Executive Committee for approval, prior to sanctioning by the Gold Fields board of directors. The business plans are aligned with the Registrant’s strategic direction and equate to the first two years of the life-of-mine plan. e) Capital expenditure, once sanctioned, must follow the company capital reporting standard. Monthly and quarterly reviews are held to assess capital programs, operating unit costs, mine physicals, plan execution and revenue streams. f) Operating unit costs are based on recent valid historical performance and where necessary take account of future changing circumstances that are anticipated to impact future operating costs.
P a g e 121 | 136 19 Economic analysis 19.1 Key inputs and assumptions Under the 31 December 2021 Mineral reserve LoM plan, the Granny Smith processing facility is not at full capacity for the full life of the operation. A portion of incrementally costed material is included, which supplements the fully costed feed but does not extend the life of the operation. The mining of the incremental material covers the full unit cost of mining, the variable unit costs of processing, rehabilitation and closure, and positively contributes to fixed overheads and off-site costs. Detailed assessments were undertaken, with iterative reviews prior to inclusion of this material in the 11 year LoM plan. The Mineral reserve LoM physical inputs are summarised in Table 19.1.1. Table 19.1.1: LoM physicals Sources Units 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 Underground LoM Processed koz 286.3 277.2 294.6 234.0 237.8 186.0 178.1 176.3 144.5 104.4 96.8 Recovery % 92.8 92.7 92.6 92.3 92.1 91.9 91.5 91.0 90.8 90.8 91.5 Sold koz 267.8 259.2 272.8 216.0 218.9 170.9 163.0 160.5 131.2 94.8 88.5 Stockpiles LOM Processed koz Recovery % Sold koz Total Sold koz 267.8 259.2 272.8 216.0 218.9 170.9 163.0 160.5 131.2 94.8 88.5 Costs, Revenue and Cashflow Revenue $ million 348.1 336.9 354.7 280.8 284.6 222.1 211.9 208.6 170.6 123.3 115.1 Operating Costs $ million 195.2 203.3 194.6 161.1 166.9 137.5 147.5 152.2 122.6 96.3 88.7 Capital Costs $ million 95.4 74.9 51.9 24.8 25.4 25.7 20.5 18.7 23.3 4.0 3.3 Other $ million 16.0 27.2 26.1 29.0 18.5 18.9 13.9 14.6 17.0 18.0 32.0 Royalties* $ million 10.4 11.1 11.7 9.3 9.4 7.3 7.0 6.9 5.6 4.1 3.8 Government levies $ million - - - - - - - - - - - Interest (if applicable) $ million - - - - - - - - - - - Total Costs (Excl Tax) $ million 317.0 316.6 284.3 224.1 220.2 189.3 188.9 192.4 168.5 122.3 127.8 Taxes $ million 7.5 6.1 19.8 13.9 13.9 6.4 2.9 0.5 0.0 0.0 0.0 Cashflow $ million 23.6 14.3 50.5 42.7 50.4 26.4 20.0 15.7 2.0 1.0 -12.7 Discounted cashflow at 3.8 % (NPV) $ million 23.6 13.7 46.9 38.2 43.4 21.9 16.0 12.1 1.5 0.7 -8.8 Notes: a) The capital costs are based on the 31 December 2021 life-of-mine schedule for proved and probable reserves only. The Mineral resource and exploration required to replace depletion is not included in this techno-economic assessment. b) No inferred Mineral resource is included in the life-of-mine processing schedule or techno-economic evaluation. Source: Granny Smith CPR, 2021 The assumptions on which the economic analysis is based include: All assumptions are on 31 December 2021 money terms consistent with the valuation date. Royalties on revenue is consistent with relevant legislation (2.5 % ad valorem). Gold Fields operations are considered as a unit for taxation purposes and assessed losses and capital expenditure can be offset against corporate taxes. The real base-case discount rate of 3.8 % is determined by Gold Fields Corporate Finance annually. A 30 % corporate tax rate. A closure liability of $65.5 million. Discounted cashflow (DCF) applied to post-tax, pre-finance cashflows and reported in financial years ending 31 December. The LoM operating and capital cost inputs, including rehabilitation, leasing and closure costs, and revenue assumptions for the economic analysis are summarised in Table 19.1.2. P a g e 122 | 136 Table 19.1.2: LoM cost and revenue assumptions – Breakdown of ESG Operating cost item Units 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 Progressive Closure $ million 10.7 8.3 5.2 5.3 5.6 5.1 5.1 5.3 5.0 4.9 4.9 Source: Granny Smith CPR, 2021 19.2 Economic analysis The NPV for Granny Smith based on the DCF forecast at a 3.8 % discount rate using the scheduled Mineral reserves in the LoM plan is $204.3 million. 19.3 Sensitivity analysis Sensitivity analyses were performed to ascertain the impact on NPV to changes in operating costs, capital costs, grade and gold price as summarised in Table 19.3.1 to Table 19.3.4. Table 19.3.1: NPV sensitivity to changes in gold price Gold price -15 % -10 % -5 % 0 % +5 % +10 % +15 % +25 % +31 % Gold Price ($/oz) 1,105 1,170 1,235 1,300 1,365 1,430 1,495 1,625 1,700 NPV ($ million) -66.4 32.2 119.8 204.3 286.7 368.8 449.4 819.0 940.9 Source: Granny Smith CPR, 2021 Table 19.3.2: NPV sensitivity to changes in grade Grade -15 % -10 % -5 % 0 % +5 % +10 % +15 % NPV ($ million) -65.6 32.6 120.0 204.3 286.5 368.4 448.8 Source: Granny Smith CPR, 2021 Table 19.3.3: NPV sensitivity to changes in capital costs Capital -15 % -10 % -5 % 0 % +5 % +10 % +15 % NPV ($ million) 242.3 229.7 217.0 204.3 191.7 178.7 165.8 Source: Granny Smith CPR, 2021 Table 19.3.4: NPV sensitivity to changes in operating costs Operating cost -15 % -10 % -5 % 0 % +5 % +10 % +15 % NPV ($ million) 369.3 314.6 259.5 204.3 148.0 90.3 31.9 Source: Granny Smith CPR, 2021 Table 19.3.5: NPV sensitivity to changes in discount rate Discount rate 2 % 3 % 3.8 % 5 % NPV ($ million) 214.4 208.7 204.3 198.0 Notes: a) The Qualified person is of the opinion that the tecno-economic model based on the Mineral reserve physicals. The Recent historic assumptions are used to test the Mineral reserve economic assumptions. The material assumptions have been found to be valid and used in the tecno-economic studies. The discounted cashflow has economic viability and a NPV of $204.3 million at a discount rate of 3.8 %. The IRR has not been presented for this tecno-economic study. b) The tecno-economic study for the Mineral reserves excludes all inferred Mineral resource material. Source: Granny Smith CPR, 2021 P a g e 123 | 136 20 Adjacent properties The Qualified person is unable to verify the information listed for the properties adjacent to Granny Smith and that the information is not necessarily indicative of the mineralisation on the property that is the subject of this technical report summary. Granny Smith is essentially stand alone and has no or little reliance of neighbouring properties and the proximity of workings are not expected to interact in any way with Granny Smith and the lease and permit areas are not overlapping. There are many companies and individuals that control tenements adjacent to Granny Smith. Material adjacent properties include: AngloGold Ashanti Ltd - operator of the Sunrise Dam Gold Mine to the south of Granny Smith. Dacian Gold Ltd (ASX: DCN)– operator of the Mt Morgans Gold Mine to the west of Granny Smith. Focus Minerals Ltd (ASX: FML) at its Laverton Gold Project to the north of Granny Smith. Lynas Rare Earths (ASX: LYC) at its Mt Weld Rare Earth Mine to the southeast of Granny Smith. P a g e 124 | 136 21 Other relevant data and information Gold Fields’ commitment to materiality, transparency and competency in its Mineral resources and Mineral reserves disclosure to regulators and in the public domain is of paramount importance to the Qualified person and the Registrants Executive Committee and Board of Directors continue to endorse the company’s internal and external review and audit assurance protocols. This Technical Report Summary should be read in totality to gain a full understanding of Granny Smith’s Mineral resource and Mineral reserve estimation and reporting process, including data integrity, estimation methodologies, modifying factors, mining and processing capacity and capability, confidence in the estimates, economic analysis, risk and uncertainty and overall projected property value. However, to ensure consolidated coverage of the company’s primary internal controls in generating Mineral resource and reserve estimates the following key point summary is provided: a) A comprehensive quality assurance and quality control (QA/QC) protocol is embedded at Granny Smith and all Gold Fields operations. It draws on industry leading practice for data acquisition and utilises national standards authority accredited laboratories which are regularly reviewed. Analytical QA/QC is maintained and monitored through the submission of sample blanks, certified reference material and duplicates and umpire laboratory checks. b) Corporate Technical Services (CTS), based in Perth, comprises subject matter experts across the disciplines of geology, resource estimation, geotechnical, mining, engineering, modernisation, capital projects, processing, metallurgy, tailings management and Mineral resource and reserve reporting governance. The CTS team budget for regular site visits to all operating mines when emphasis is placed on-site inspection and direct engagement with the technical staff to drive protocols and standards and enable on-site training and upskilling. CTS provides technical oversight and guidance to the operating Regions and mines and ensures an additional level of assurance to the Mineral resource and reserve estimates to supplement the mine sites and Regional technical teams. c) Independent audit review of fixed infrastructure is conducted annually with the appointed insurance auditor focussed on plant, machinery and mine infrastructure risks. An effective structural and corrosion maintenance program with benchmark inspections is in place supported by equipment condition monitoring major critical component spares. Focus areas include the primary jaw crusher, ball mill shell or motor failure, structural failure of plant or conveyor, process tank failure and large transformer failure. Critical spares are well resourced and there are no large items not supported by on-site spares holdings. d) Mobile equipment is largely owned and well maintained by the mining contractor, Barminco, with development and haulage units at New Holland owned by Granny Smith. There is some spare capacity in most of the fleets or within the Barminco group, or hire units are readily available in the region. e) Processing controls include the preparation of quarterly plant metal accounting reconciliation reports by the mine sites which are reviewed by the Regional Metallurgical Manager and VP Metallurgy in the CTS team. Any monthly reconciliation variance outside the limits provided within the Gold Fields Plant Metal Accounting Standard is flagged for follow up assessment and remediation if warranted. f) Granny Smith has a tailings management plan that promotes risk minimisation to operators and stakeholders over the lifecycle of each tailings storage facility (TSF). Granny Smith’s TSF’s are operated in accordance with the company TSF Management Guidelines which are aligned with the International Council on Metals & Mining’s (ICMM) Position Statement on preventing catastrophic failure of TSFs (December 2016). Active TSFs are subject to an independent, external audit every three years, as well as regular inspections and formal facility safety reviews by formally appointed Engineers of Record (EoR). Further improvements in tailings management are expected through achievement of compliance with the new independently developed Global Industry Standard for Tailings Management (GISTM) issued in 2020. g) The integration of Environmental, Social and Governance (ESG) themes into the estimation process continues as an important consideration for modifying factors, reasonable prospects for economic extraction (RPEE) assessments and to underpin the integrity of the Mineral resources and Mineral reserves. The company’s ESG Charter, issues and priorities are fully considered in the life-of-mine plan with particular emphasis on tailings
P a g e 125 | 136 management, integrated mine closure planning, security of energy and water and the social and regulatory license to operate. h) Gold Fields also follows an embedded process of third-party reviews to provide expert independent assurance regarding Mineral resource and Mineral reserve estimates and compliance with relevant reporting rules and codes. In line with Gold Fields policy, every material property is reviewed by an independent third-party on average no less than once every three years, or when triggered by a material year-on-year change. Certificates of compliance are received from the companies that conduct the external audits which are also configured to drive continuous improvement in the estimation process. i) Importantly, Gold Fields endorses a well embedded risk and control matrix (RACM) configured to provide an annual assessment of the effectiveness of the registrants’ internal controls concerning the life of mine planning process and Mineral resource and reserve estimation and reporting. j) The internal controls include coverage of the following (inter alia): i Reasonableness of parameters and assumptions used in the Mineral resource and reserve estimation process ii Reasonableness of the interpretations applied to the geological model and estimation techniques iii Integrity in the mine design and scheduling, including reasonableness of the mine planning assumptions, modifying factors, cut-off grades, mining and processing methods and supporting key technical inputs such as year on year reconciliation, geotechnical, mining equipment, infrastructure, water, energy and economic analysis iv Provision of the necessary skills, experience and expertise at the mine sites and the Regions to undertake and complete the work with the required level of technical ability and competency, including professional registration as a Qualified person v Alignment with the SK 1300 rule (guidance and instruction) for the reporting of Mineral resources and reserves vi Review of the disclosure of the registrants’ Mineral resources and reserves process. k) Because of its inherent limitations, internal controls may not prevent or detect all errors or misstatements. Also, projections of any valuation of effectiveness to future periods are subject to risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with policies and procedures may deteriorate RCubed® is a proprietary cloud-based reporting system adopted by Gold Fields in 2021 to enhance the level governance and data security concerning Mineral resource and reserve reporting across all company properties. It ensures transparency and auditability for all data verification checks, information stage gating, the approvals process and confirmation of Qualified person credentials. The RCubed® reporting system is being incorporated into the risk and control matrix RACM matrix to support the December 2021 Mineral resource and reserve reporting. P a g e 126 | 136 22 Interpretation and conclusions The views expressed in this technical report summary are based on the fundamental assumption that the required management resources and management skills are in place to achieve the Mineral reserve LoM plan projections for Granny Smith. The Granny Smith Mineral reserves currently support a 12 year LoM plan that values the operation at $204.3 million at the reserve gold price of $1,300/oz. Climate change is an integral part of the Mineral reserve generation process and incorporating relevant costs associated with climate change, primarily decarbonisation, mitigation and adaptation to the changing climate, is a key theme for the Company. Integration of these key elements into the Mineral reserve process is being carried out progressively and simultaneously across all of Gold Fields’ sites. GSM continues to discover and replace Mineral reserves that contribute to growing the LoM profile. Continued investment in exploration and infrastructure is justified by the positive economic analysis. The Mineral reserve estimates contained in this report should not be interpreted as assurances of the economic life or the future profitability of Granny Smith. Mineral reserves are only estimates based on the factors and assumptions described herein, thus future Mineral reserve estimates may need to be revised. For example, if production costs increase or product prices decrease, a portion of the current Mineral resources, from which the Mineral reserves are derived, may become uneconomic and would therefore result in a lower estimate of Mineral reserves. The LoM plan includes forward-looking technical and economic parameters and involve a number of risks and uncertainties that could cause actual results to differ materially. The LoM plan for Granny Smith has been reviewed in detail by the Qualified person for appropriateness, reasonableness and viability, including the existence of and justification for departure from historical performance. The Qualified person considers that the Technical Economic Parameters and Financial Models are based on sound reasoning, engineering judgement and technically achievable mine plan, within the context of the risk associated with the gold mining industry. Climate change is an integral part of the Mineral reserve generation process and incorporating relevant costs associated with climate change, primarily decarbonisation, mitigation and adaptation to the changing climate, is a key theme for the Company. Integration of these key elements into the Mineral reserve process is being carried out progressively and simultaneously across all of Gold Fields’ sites. Granny Smith mine has one of the worlds largest renewable energy microgrids with 20,000 solar panels and a 2 MW battery system. The business of gold mining by its nature involves significant risks and hazards, including environmental hazards and industrial accidents. In particular, hazards associated with Gold Fields’ underground mining operations include: Rock bursts. Seismic events. Underground fires and explosions. Cave-ins or gravity falls of ground. Discharges of gases and toxic substances. Flooding. Accidents related to the presence of mobile machinery. Ground and surface water pollution. Ground subsidence. Other accidents and conditions resulting from drilling, blasting and removing and processing material from an underground mine. P a g e 127 | 136 Hazards associated with Gold Fields’ surface operations may include: Accidents associated with operating a rock dump and production stockpile, and rock transportation equipment. Production disruptions due to weather. Tailings facility collapses. Ground and surface water pollution. Gold Fields may also be subject to actions by labour groups or other interested parties who object to perceived conditions at the mines or to the perceived environmental impact of the mines. These actions may delay or halt production or may create negative publicity related to Gold Fields. If Gold Fields experiences losses of senior management or is unable to hire and retain sufficient technically skilled employees, its business may be materially and adversely affected. Gold Fields may also suffer adverse consequences from: Its reliance on outside contractors. Changes in environmental and health and safety laws and regulations. Native Title claims and Aboriginal heritage sites. Gold Fields is at risk of experiencing any of these hazards. The occurrence of any of these hazards could delay or halt production, increase production costs and result in a liability for Gold Fields. 22.1 Major risks and mitigation actions The major risks and mitigation actions at Granny Smith are based on a formal risk review and assessment using risk ranking software are summarised in Table 22.1.1. Senior management review and update the risk register on routine basis which is reported on a quarterly basis. Table 22.1.1: Risks and mitigating actions Risk description Risk mitigating action Revenue Gold Fields’ revenues are primarily derived from the sale of gold that it produces. Gold Fields will generally hedge a percentage of annual production based on market research and guidance from Gold Fields. Industry data about Gold Fields’ markets obtained from industry surveys, industry publications, market research and other publicly available third-party information. In many cases, statements in this report regarding the gold mining industry and price have been made based on internal surveys, industry forecasts, market research, as well as Gold Fields’ own experiences. Risk mitigation includes price sensitivity analyses at a range of gold prices. Exploration Exploration activities are focused on replacing production depletion and on growth in Mineral reserves to maintain operational flexibility and sustainability. Exploration for gold and other metals associated with gold are speculative in nature involves many risks and is frequently unsuccessful. The Company focuses on the extension of existing orebodies and the discovery and delineation of new ore bodies both at existing sites and at undeveloped sites. Best practices exploration techniques, technical peer reviews and technical specialists are employed to assist in conceptual targeting, execution and interpretation of the exploration programs. Geological, geochemical, geophysical, geostatistical and geo-metallurgical techniques are constantly refined to improve effectiveness and the economic viability of prospecting and mining activities. Once a potential orebody has been discovered, exploration is extended and intensified in conjunction with comprehensive infill drilling to enable clearer definition of the orebody and its technical and economic probability. Reserves published do not require any additional discovery. Geology & estimation The primary assumptions of continuity of the geologically homogenous zones are driven by the geological model, which is updated when new information arises. Any changes to the model are subject to peer and internal technical corporate review and external independent consultant review when deemed necessary. At the Australian operations, the estimation of Mineral reserves for both underground and open pit operations is based on exploration and sampling information gathered through appropriate techniques, primarily from DD, RC and AC drilling techniques. Gold Fields and the sites have well documented processes, procedures and systems to ensure appropriate drilling, logging, sampling interpretation, geology orebody and lithological modelling, and estimation are appropriately completed. Overall staff focus is on geology recruitment with required expertise and skills training coupled with field and peer reviews by both site and corporate staff are integrated into routine exploration and mining geology. Internal and external corporate audits, procedures and systems all enhance and support ongoing periodic review. All models are documented with peer reviews and model on model reconciliations to explore and understand the impacts of additional information, data and interpretation / methodology to support delivery of the most appropriate and best informed outcomes. Applications of alternative estimation methods to evaluate deposits are also routinely compiled to ensure the most relevant and appropriate estimation for mine planning is P a g e 128 | 136 Risk description Risk mitigating action delivered. This may include considering OK, SK, and simulation. Conditional estimation techniques to validate and inform options and decisions are also considered. The locations of sample points are spaced close enough to deduce or confirm geological and grade continuity. Generally, drilling is undertaken on grids, which range between 10 m by 10 m up to 50 m by 50 m, although this may vary depending on the continuity of the orebody. Due to the variety and diversity of mineralisation at the Australian operations, sample spacing may also vary depending on each particular ore type. Mine planning & scheduling Changes in assumptions underlying Gold Fields’ Mineral reserve estimates risk. Modifying factors used to calculate the cutoff grades include adjustments to mill delivered amounts due to dilution and ore loss incurred in the course of mining, expected return on investment, and sustaining capital. These may change but typically are reviewed and managed through detailed reconciliation processes to minimise variations and impacts. Modifying factors applied in estimating reserves are primarily based on historical empirical information, but commonly incorporate adjustments for planned operational improvements. Mineral reserves also take into account operating cost levels as well as necessary capital and sustaining capital provisions required at each operation and are supported by LoM plans. Detail planning protocols and review processes by qualified and experienced technical staff both on site and regional levels are held to ensure consistency and applicability of due process. Mining execution The ability to achieve anticipated efficiencies and production plans due to nature of risk and impacts associated with normal mining routine activities. These could include geotechnical, equipment and maintenance, explosives, staffing, power and water supply. Benchmarking and technical reviews of all mine plans to validate and test assumptions are normal Mineral resource & reserve processes. Assumptions applied in estimating mine planning for Mineral reserves are primarily based on historical empirical information, but commonly incorporate adjustments for planned operational performance. Equipment planned schedule and maintenance programs and condition monitoring processes are in place to ensure production capability. Geotechnical Geotechnical evaluation and monitoring, seismic systems and slope wall rock monitoring are all normal processes to mitigate risk. Underground geotechnical risk includes the impact of seismicity on operations, which may result in unplanned delays, closure, or falls of ground. Worse than predicted overbreak or poor mining recovery, due to geotechnical failures in stoping may also result in lower than predicted gold production. Ground control management plans are used to manage the geotechnical risk at Granny Smith. Social licence to operate Many mining companies face increasing pressure over their “social license to operate” which can be understood as the acceptance of the activities of these companies by local stakeholders. While formal permission to operate is ultimately granted by host governments, many mining activities require social permission from host communities and influential stakeholders to carry out operations effectively and profitably. This aspect could impact future Mineral reserves & resources, mining activity and delivery. To maintain its social license to operate, Gold Fields may need to design or redesign parts of its mining operations to minimise their impact on such communities and the environment, either by changing mining plans to avoid such impact, by modifying operations, changing planned capital expenditures or by relocating the affected people to an agreed location. Responsive measures may require Gold Fields to take costly time-consuming remedial measures, including the full restoration of livelihoods of those impacted. Staffing & technical capability Gold Fields’ ability to operate or expand effectively depends largely on the experience, skills and performance of its senior management team and technically skilled employees. GFA operates in a good labour market and stable political jurisdiction which adapts recruitment, staff development / retention policies to meet labour and staffing demand to support and deliver on operations. Environmental and industrial accidents Gold mining by its nature involves significant risks and hazards, including environmental hazards and industrial and mining accidents. These may include, for example, seismic events, fires, cave-ins and blockages, flooding, discharges of gases and toxic substances, contamination of water, air or soil resources, radioactivity and other accidents or conditions resulting from mining activities including, among other things, blasting and the transport, storage and handling of hazardous materials. Gold Fields has appropriate staffing structures and processes and programs which manage, monitor and report on key environmental, health and safety compliance. Gold Fields also subscribes to a number of international regulatory frameworks (e.g. ISO 14001, ISO18001, Cyanide Code) which include process and external audits review monitoring for compliance. Notes: a) The Qualified person is of the opinion that the risks identifies have reasonable risk mitigations and that action plans current and future will not materially affect the life-of-mine reserve estimation. Source: Granny Smith CPR, 2021
P a g e 129 | 136 23 Recommendations Ongoing exploration and geological interpretation suggest that the Granny Smith property has the potential to extend and replace existing Mineral resources and reserves. It is recommended that further exploration is carried out at the following areas which have a good probability of extending mine life: Wallaby Zone 135. Wallaby Zone 150. Granny Smith Complex. The Granny Smith Mineral resource and Mineral reserve effective 31 December 2021 are reasonable estimates. The Qualified person is of the opinion that there are no additional phases of work required to enhance this disclosure. P a g e 130 | 136 24 References The primary reference documents that have written consent to be used by the appointed Gold Fields Lead Qualified persons Technical Report Summary is the Granny Smith Competent Person Report 31 December 2021 for Mineral Resources and Mineral Reserves. This report was compiled by Don Grimbeek who is the Gold Fields appointed Lead Qualified person for Granny Smith Gold Mine and accepts responsibility for the Competent Person Report 31 December 2021 for Mineral Resources and Mineral Reserves as a whole. This report is referred to as “Granny Smith CPR 2021” in this document. P a g e 131 | 136 25 Reliance on information provided by the Registrant The Qualified person has not identified any information provided by the Registrant for Granny Smith that requires noting under the reliance on information provided. P a g e 132 | 136 26 Definitions 26.1 Adequate geological evidence When used in the context of Mineral resource determination, means evidence that is sufficient to establish geological and grade or quality continuity with reasonable certainty. 26.2 Conclusive geological evidence When used in the context of Mineral resource determination, means evidence that is sufficient to test and confirm geological and grade or quality continuity. 26.3 Cutoff grade Is the grade (i.e., the concentration of metal or mineral in rock) that determines the destination of the material during mining. For purposes of establishing “prospects of economic extraction,” the cutoff grade is the grade that distinguishes material deemed to have no economic value (it will not be mined in underground mining or if mined in surface mining, its destination will be the waste dump) from material deemed to have economic value (its ultimate destination during mining will be a processing facility). Other terms used in similar fashion as cutoff grade include net smelter return, pay limit, and break-even stripping ratio. 26.4 Development stage issuer Is an issuer that is engaged in the preparation of Error! Reference source not found.s for extraction on at least one Material property. 26.5 Development stage property Is a property that has Mineral reserves disclosed, pursuant to this subpart, but no material extraction. 26.6 Economically viable When used in the context of Mineral reserve determination, means that the Qualified person has determined, using a discounted cash flow analysis, or has otherwise analytically determined, that extraction of the Mineral reserve is economically viable under reasonable Investment and market assumptions. 26.7 Exploration results Are data and information generated by mineral exploration programs (i.e., programs consisting of sampling, drilling, trenching, analytical testing, assaying, and other similar activities undertaken to locate, investigate, define or delineate a mineral prospect or mineral deposit) that are not part of a disclosure of Mineral resources or Mineral reserves. A Registrant must not use exploration results alone to derive estimates of tonnage, grade, and production rates, or in an assessment of economic viability. 26.8 Exploration stage issuer Is an issuer that has no Material property with Error! Reference source not found.s disclosed. 26.9 Exploration stage property Is a property that has no Error! Reference source not found.s disclosed. 26.10 Exploration target Is a statement or estimate of the exploration potential of a mineral deposit in a defined geological setting where the statement or estimate, quoted as a range of tonnage and a range of grade (or quality), relates to mineralisation for which there has been insufficient exploration to estimate a Mineral resource.
P a g e 133 | 136 26.11 Feasibility study Is a comprehensive technical and economic study of the selected development option for a mineral project, which includes detailed assessments of all applicable Modifying factors, as defined by this section, together with any other relevant operational factors, and detailed financial analysis that are necessary to demonstrate, at the time of reporting, that extraction is Economically viable. The results of the study may serve as the basis for a final decision by a proponent or financial institution to proceed with, or finance, the development of the project. 1. A feasibility study is more comprehensive, and with a higher degree of accuracy, than a Preliminary feasibility study (or pre-feasibility study). It must contain mining, infrastructure, and process designs completed with sufficient rigor to serve as the basis for an investment decision or to support project financing. 2. The confidence level in the results of a feasibility study is higher than the confidence level in the results of a Preliminary feasibility study (or pre-feasibility study). Terms such as full, final, comprehensive, bankable, or definitive feasibility study are equivalent to a feasibility study. 26.12 Final market study Is a comprehensive study to determine and support the existence of a readily accessible market for the mineral. It must, at a minimum, include product specifications based on final geologic and metallurgical testing, supply and demand forecasts, historical prices for the preceding five or more years, estimated long term prices, evaluation of competitors (including products and estimates of production volumes, sales, and prices), customer evaluation of product specifications, and market entry strategies or sales contracts. The study must provide justification for all assumptions, which must include assumptions concerning the Material contracts required to develop and sell the Mineral reserves. 26.13 Indicated Mineral resource Is that part of a Mineral resource for which quantity and grade or quality are estimated on the basis of Adequate geological evidence and sampling. The level of geological certainty associated with an indicated Mineral resource is sufficient to allow a Qualified person to apply Modifying factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Because an indicated Mineral resource has a lower level of confidence than the level of confidence of a Measured Mineral resource, an indicated Mineral resource may only be converted to a Probable Mineral reserve. 26.14 Inferred Mineral resource Is that part of a Mineral resource for which quantity and grade or quality are estimated on the basis of Limited geological evidence and sampling. The level of geological uncertainty associated with an inferred Mineral resource is too high to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation of economic viability. Because an inferred Mineral resource has the lowest level of geological confidence of all Mineral resources, which prevents the application of the Modifying factors in a manner useful for evaluation of economic viability, an inferred Mineral resource may not be considered when assessing the economic viability of a mining project, and may not be converted to a Mineral reserve. 26.15 Initial assessment Is a preliminary technical and economic study of the economic potential of all or parts of mineralisation to support the disclosure of Mineral resources. The initial assessment must be prepared by a Qualified person and must include appropriate assessments of reasonably assumed technical and economic factors, together with any other relevant operational factors, that are necessary to demonstrate at the time of reporting that there are reasonable prospects for economic extraction. An initial assessment is required for disclosure of Mineral resources but cannot be used as the basis for disclosure of Mineral reserves. 26.16 Investment and market assumptions When used in the context of Mineral reserve determination, includes all assumptions made about the prices, exchange rates, interest and discount rates, sales volumes, and costs that are necessary to determine the economic viability of the P a g e 134 | 136 Mineral reserves. The Qualified person must use a price for each commodity that provides a reasonable basis for establishing that the project is Economically viable. 26.17 Limited geological evidence When used in the context of Mineral resource determination, means evidence that is only sufficient to establish that geological and grade or quality continuity are more likely than not. 26.18 Material The term material, when used to qualify a requirement for the furnishing of information as to any subject, limits the information required to those matters to which there is a substantial likelihood that a reasonable investor would attach importance in determining whether to purchase the security registered. 26.19 Material of economic interest When used in the context of Mineral resource determination, includes mineralisation, including dumps and tailings, mineral brines, and other resources extracted on or within the earth's crust. It does not include oil and gas resources resulting from oil and gas producing activities, (e.g., helium and carbon dioxide), geothermal fields, and water. 26.20 Measured Mineral resource Is that part of a Error! Reference source not found. for which quantity and grade or quality are estimated on the basis of Conclusive geological evidence and sampling. The level of geological certainty associated with a measured Mineral resource is sufficient to allow a Qualified person to apply Modifying factors, as defined in this section, in sufficient detail to support detailed mine planning and final evaluation of the economic viability of the deposit. Because a measured Mineral resource has a higher level of confidence than the level of confidence of either an Indicated Mineral resource or an Inferred Mineral resource, a measured Mineral resource may be converted to a Proven Mineral reserve or to a Probable Mineral reserve. 26.21 Mineral reserve Is an estimate of tonnage and grade or quality of Indicated Mineral resources and Measured Mineral resources that, in the opinion of the Qualified person, can be the basis of an Economically viable project. More specifically, it is the economically mineable part of a measured or Indicated Mineral resource, which includes diluting materials and allowances for losses that may occur when the material is mined or extracted. 26.22 Mineral resource Is a concentration or occurrence of Material of economic interest in or on the Earth's crust in such form, grade or quality, and quantity that there are reasonable prospects for economic extraction. A Mineral resource is a reasonable estimate of mineralisation, taking into account relevant factors such as Cutoff grade, likely mining dimensions, location or continuity, that, with the assumed and justifiable technical and economic conditions, is likely to, in whole or in part, become economically extractable. It is not merely an inventory of all mineralisation drilled or sampled. 26.23 Modifying factors Are the factors that a Qualified person must apply to Indicated Mineral resources and Measured Mineral resources and then evaluate in order to establish the economic viability of Error! Reference source not found.s. A Qualified person must apply and evaluate modifying factors to convert Measured Mineral resources and Indicated Mineral resources to Proven Mineral reserves and Probable Mineral reserves. These factors include, but are not restricted to: Mining; processing; metallurgical; infrastructure; economic; marketing; legal; environmental compliance; plans, negotiations, or agreements with local individuals or groups; and governmental factors. The number, type and specific characteristics of the modifying factors applied will necessarily be a function of and depend upon the mineral, mine, property, or project. P a g e 135 | 136 26.24 Preliminary feasibility study (or pre-feasibility study) Is a comprehensive study of a range of options for the technical and economic viability of a mineral project that has advanced to a stage where a Qualified person has determined (in the case of underground mining) a preferred mining method, or (in the case of surface mining) a pit configuration, and in all cases has determined an effective method of mineral processing and an effective plan to sell the product. 1. A pre-feasibility study includes a financial analysis based on reasonable assumptions, based on appropriate testing, about the Modifying factors and the evaluation of any other relevant factors that are sufficient for a Qualified person to determine if all or part of the Indicated Mineral resources and Measured Mineral resources may be converted to Mineral reserves at the time of reporting. The financial analysis must have the level of detail necessary to demonstrate, at the time of reporting, that extraction is Economically viable. 2. A pre-feasibility study is less comprehensive and results in a lower confidence level than a Feasibility study. A pre-feasibility study is more comprehensive and results in a higher confidence level than an Initial assessment. 26.25 Preliminary market study Is a study that is sufficiently rigorous and comprehensive to determine and support the existence of a readily accessible market for the mineral. It must, at a minimum, include product specifications based on preliminary geologic and metallurgical testing, supply and demand forecasts, historical prices for the preceding five or more years, estimated long term prices, evaluation of competitors (including products and estimates of production volumes, sales, and prices), customer evaluation of product specifications, and market entry strategies. The study must provide justification for all assumptions. It can, however, be less rigorous and comprehensive than a Final market study, which is required for a full Feasibility study. 26.26 Probable Mineral reserve Is the economically mineable part of an Indicated Mineral resource and, in some cases, a Measured Mineral resource. 26.27 Production stage issuer Is an issuer that is engaged in material extraction of Error! Reference source not found.s on at least one Material property. 26.28 Production stage property Is a property with material extraction of Error! Reference source not found.s. 26.29 Proven Mineral reserve Is the economically mineable part of a Measured Mineral resource and can only result from conversion of a Measured Mineral resource. 26.30 Qualified person Is an individual who is: 3. A mineral industry professional with at least five years of Relevant experience in the type of mineralisation and type of deposit under consideration and in the specific type of activity that person is undertaking on behalf of the Registrant; and 4. An eligible member or licensee in good standing of a recognised professional organisation at the time the technical report is prepared. For an organisation to be a recognised professional organisation, it must: i Be either: A. An organisation recognised within the mining industry as a reputable professional association; or P a g e 136 | 136 B. A board authorised by U.S. federal, state or foreign statute to regulate professionals in the mining, geoscience or related field; ii Admit eligible members primarily on the basis of their academic qualifications and experience; iii Establish and require compliance with professional standards of competence and ethics; iv Require or encourage continuing professional development; v Have and apply disciplinary powers, including the power to suspend or expel a member regardless of where the member practices or resides; and vi Provide a public list of members in good standing. 26.31 Relevant experience Means, for purposes of determining whether a party is a Qualified person, that the party has experience in the specific type of activity that the person is undertaking on behalf of the Registrant. If the Qualified person is preparing or supervising the preparation of a technical report concerning Exploration results, the relevant experience must be in exploration. If the Qualified person is estimating, or supervising the estimation of Mineral resources, the relevant experience must be in the estimation, assessment and evaluation of Mineral resources and associated technical and economic factors likely to influence the prospect of economic extraction. If the Qualified person is estimating, or supervising the estimation of Mineral reserves, the relevant experience must be in engineering and other disciplines required for the estimation, assessment, evaluation and economic extraction of Mineral reserves. 1. Relevant experience also means, for purposes of determining whether a party is a Qualified person, that the party has experience evaluating the specific type of mineral deposit under consideration (e.g., coal, metal, base metal, industrial mineral, or mineral brine). The type of experience necessary to qualify as relevant is a facts and circumstances determination. For example, experience in a high-nugget, vein-type mineralisation such as tin or tungsten would likely be relevant experience for estimating Mineral resources for vein-gold mineralisation, whereas experience in a low grade disseminated gold deposit likely would not be relevant. Note 1 to paragraph (1) of the definition of relevant experience: It is not always necessary for a person to have five years' experience in each and every type of deposit in order to be an eligible Qualified person if that person has relevant experience in similar deposit types. For example, a person with 20 years' experience in estimating Mineral resources for a variety of metalliferous hard-rock deposit types may not require as much as five years of specific experience in porphyry-copper deposits to act as a Qualified person. Relevant experience in the other deposit types could count towards the experience in relation to porphyry-copper deposits. 2. For a Qualified person providing a technical report for Exploration results or Error! Reference source not found. estimates, relevant experience also requires, in addition to experience in the type of mineralisation, sufficient experience with the sampling and analytical techniques, as well as extraction and processing techniques, relevant to the mineral deposit under consideration. Sufficient experience means that level of experience necessary to be able to identify, with substantial confidence, problems that could affect the reliability of data and issues associated with processing. 3. For a Qualified person applying the Modifying factors, as defined by this section, to convert Error! Reference source not found.s to Error! Reference source not found.s, relevant experience also requires: i Sufficient knowledge and experience in the application of these factors to the mineral deposit under consideration; and ii Experience with the geology, geostatistics, mining, extraction and processing that is applicable to the type of mineral and mining under consideration.
Date and Signature Page Qualified Person Signature Date Dr Julian Verbeek /s/ Dr. Julian Verbeek 27 March 2022 Richard Butcher /s/ Richard Butcher 28 March 2022 Dr Winfred Assibey-Bonsu /s/ Dr Winfred Assibey-Bonsu 27 March 2022 Andrew Engelbrecht /s/ Andrew Engelbrecht 28 March 2022 Peter Andrews /s/ Peter Andrews 27 March 2022 Daniel Hillier /s/ Daniel Hillier 28 March 2022 Johan Boshoff /s/ Johan Boshoff 28 March 2022 Andre Badenhorst /s/ Andre Badenhorst 27 March 2022 Fiona Phillips /s/ Fiona Phillips 29 March 2022 Trent Strickland /s/ Trent Strickland 29 March 2022 Don Grimbeek /s/ Don Grimbeek 30 March 2022 Richard Tully /s/ Richard Tully 29 March 2022 Neil Morris /s/ Neil Morris 29 March 2022
Exhibit 96.7 Goldfields.com Technical Report Summary of Mineral reserves and Mineral resources 31 December 2021 for Gold Fields Limited – Gruyere Gold Mine – Australia
Table of Contents 1 Executive Summary ............................................................................................................................................................. 8 1.1 Property description and ownership ............................................................................................................................ 8 1.2 Geology and mineralisation ........................................................................................................................................ 8 1.3 Exploration, development and operations ................................................................................................................... 9 1.4 Mineral resource estimates ........................................................................................................................................ 10 1.5 Mineral reserve estimates .......................................................................................................................................... 11 1.6 Capital and operating cost estimates ......................................................................................................................... 12 1.7 Permitting .................................................................................................................................................................. 12 1.8 Conclusions and recommendations ........................................................................................................................... 13 2 Introduction......................................................................................................................................................................... 14 2.1 Registrant for whom the technical report summary was prepared............................................................................. 14 2.2 Terms of reference and purpose of the technical report summary ............................................................................. 14 2.3 Sources of information .............................................................................................................................................. 14 2.4 Qualified persons and details of inspection ............................................................................................................... 14 2.5 Report version update ............................................................................................................................................... 15 3 Property description ........................................................................................................................................................... 16 3.1 Property location ....................................................................................................................................................... 16 3.2 Ownership ................................................................................................................................................................. 16 3.3 Property area ............................................................................................................................................................. 16 3.4 Property mineral titles, claims, mineral rights, leases and options ............................................................................ 16 3.5 Mineral rights description ......................................................................................................................................... 18 3.6 Encumbrances ........................................................................................................................................................... 20 3.7 Other significant factors and risks ............................................................................................................................. 20 3.8 Royalties or similar interest....................................................................................................................................... 20 4 Accessibility, climate, local resources, infrastructure and physiography .................................................................... 21 4.1 Topography, elevation, and vegetation ..................................................................................................................... 21 4.2 Access ....................................................................................................................................................................... 22 4.3 Climate ...................................................................................................................................................................... 22 4.4 Infrastructure ............................................................................................................................................................. 22 4.5 Book value ................................................................................................................................................................ 24 5 History .................................................................................................................................................................................. 25 6 Geological setting, mineralization, and deposit ............................................................................................................... 26 6.1 Geological setting ..................................................................................................................................................... 26 6.2 Mineralisation ........................................................................................................................................................... 28 7 Exploration .......................................................................................................................................................................... 32 7.1 Exploration ................................................................................................................................................................ 32 7.2 Drilling ...................................................................................................................................................................... 32 7.2.1 Type and extent ................................................................................................................................................. 32 7.2.2 Procedures ......................................................................................................................................................... 33 7.2.3 Results ............................................................................................................................................................... 34 7.3 Hydrogeology ........................................................................................................................................................... 35 7.4 Geotechnical ............................................................................................................................................................. 36 7.4.1 Laboratory testing ............................................................................................................................................. 36 7.4.2 Regional stability .............................................................................................................................................. 38 7.4.3 Infrastructure ..................................................................................................................................................... 39 7.5 Density ...................................................................................................................................................................... 39 8 Sample preparation, analyses, and security .................................................................................................................... 41 8.1 Sample collection ...................................................................................................................................................... 41
P a g e 3 | 1 3 8 8.2 Sample preparation ................................................................................................................................................... 41 8.3 Sample analysis ......................................................................................................................................................... 42 8.4 Quality control and quality assurance (QA/QC) ....................................................................................................... 45 9 Data verification ................................................................................................................................................................. 47 9.1 Data management ...................................................................................................................................................... 47 9.2 Plant Sampling .......................................................................................................................................................... 48 9.3 Drilling ...................................................................................................................................................................... 48 9.4 Sampling ................................................................................................................................................................... 48 9.5 Survey ....................................................................................................................................................................... 49 9.6 Sample analysis ......................................................................................................................................................... 49 9.7 Geological modelling ................................................................................................................................................ 49 10 Mineral processing and metallurgical testing ................................................................................................................. 50 10.1 Testing and procedures ............................................................................................................................................. 50 10.1.1 Background ....................................................................................................................................................... 50 10.1.2 Metallurgical sampling & testing ...................................................................................................................... 51 10.2 Relevant results ......................................................................................................................................................... 52 10.2.1 Sample Head Analysis ...................................................................................................................................... 52 10.2.2 Metallurgical recovery ...................................................................................................................................... 54 10.2.3 Ore hardness ...................................................................................................................................................... 57 10.2.4 Abrasion Index .................................................................................................................................................. 60 10.3 Plant Sampling and reconciliation ............................................................................................................................. 61 10.4 Deleterious Elements ................................................................................................................................................ 61 10.5 Metallurgical Risks ................................................................................................................................................... 62 10.5.1 Sample Representativity .................................................................................................................................... 62 10.5.2 Laboratory Test Methods and Scale-up ............................................................................................................. 62 10.5.3 Deleterious Elements ........................................................................................................................................ 63 11 Mineral resource estimates ................................................................................................................................................ 64 11.1 Mineral resources estimation criteria ........................................................................................................................ 64 11.1.1 Geological model and interpretation ................................................................................................................. 64 11.1.2 Block modelling ................................................................................................................................................ 64 11.1.3 Bulk density ...................................................................................................................................................... 64 11.1.4 Compositing and domaining ............................................................................................................................. 64 11.1.5 Top cuts ............................................................................................................................................................. 65 11.1.6 Variography ...................................................................................................................................................... 65 11.1.7 Grade estimation ............................................................................................................................................... 65 11.1.8 Selective mining units (SMU) ........................................................................................................................... 66 11.1.9 Model validation ............................................................................................................................................... 66 11.1.10 Cut-off grades ................................................................................................................................................... 67 11.1.11 Classification criteria ........................................................................................................................................ 68 11.2 Mineral resources as of 31 December 2021 .............................................................................................................. 71 11.3 Audits and reviews .................................................................................................................................................... 72 11.4 Comparison 31 December 2021 with 31 December 2020 Mineral resource ............................................................. 72 12 Mineral reserve estimates .................................................................................................................................................. 73 12.1 Level of assessment .................................................................................................................................................. 73 12.2 Mineral reserve estimation criteria ............................................................................................................................ 73 12.2.1 Recent production performance ........................................................................................................................ 73 12.2.2 Key assumptions and parameters ...................................................................................................................... 74 12.2.3 Cut-off grades ................................................................................................................................................... 76 12.2.4 Mine design and planning ................................................................................................................................. 77 12.2.5 Mining schedule ................................................................................................................................................ 78 12.2.6 Processing schedule .......................................................................................................................................... 79 12.2.7 Classification criteria ........................................................................................................................................ 79
P a g e 4 | 1 3 8 12.2.8 Economic assessment ........................................................................................................................................ 79 12.3 Mineral reserves as of 31 December 2021 ................................................................................................................ 80 12.4 Audits and reviews .................................................................................................................................................... 81 12.5 Comparison with 31 December 2020 Mineral reserve .............................................................................................. 81 13 Mining methods .................................................................................................................................................................. 83 13.1 Mining methods open pits ......................................................................................................................................... 83 13.2 Geotechnical models ................................................................................................................................................. 86 13.2.1 Regional Stability .............................................................................................................................................. 87 13.2.2 Infrastructure ..................................................................................................................................................... 87 13.3 Hydrogeological models ........................................................................................................................................... 87 14 Processing and recovery methods ..................................................................................................................................... 89 14.1 Flow sheet and design ............................................................................................................................................... 89 14.2 Recent process plant performance ............................................................................................................................. 90 14.3 Process plant requirements ........................................................................................................................................ 91 14.4 Processing Risks ....................................................................................................................................................... 91 14.4.1 Major Equipment Failure .................................................................................................................................. 91 14.4.2 Plant Operational Management ......................................................................................................................... 92 14.4.3 Operating Costs, Plant Consumables and Reagents .......................................................................................... 92 14.4.4 Mill throughput ................................................................................................................................................. 92 15 Infrastructure ...................................................................................................................................................................... 94 15.1 Tailings storage facilities (TSF) ................................................................................................................................ 94 15.2 Waste rock dumps ..................................................................................................................................................... 95 15.3 Water ......................................................................................................................................................................... 96 15.4 Power ........................................................................................................................................................................ 97 15.5 Accommodation ........................................................................................................................................................ 97 15.6 Site access ................................................................................................................................................................. 97 15.7 Other infrastructure ................................................................................................................................................... 98 16 Market studies ..................................................................................................................................................................... 99 16.1 Preliminary market study .......................................................................................................................................... 99 16.2 Metal Price history .................................................................................................................................................. 101 17 Environmental studies, permitting, and plans, negotiations, or agreements with local individuals or groups .... 102 17.1 Permitting ................................................................................................................................................................ 102 17.2 Environmental studies ............................................................................................................................................. 104 17.3 Waste disposal, monitoring and water management ............................................................................................... 107 17.3.1 Tailings storage facilities (TSF) ...................................................................................................................... 107 17.3.2 Waste rock dumps ........................................................................................................................................... 110 17.3.3 Water management.......................................................................................................................................... 111 17.4 Social and community ............................................................................................................................................. 112 17.4.1 Native Title and heritage ................................................................................................................................. 112 17.4.2 Social programs ............................................................................................................................................... 113 17.5 Mine closure............................................................................................................................................................ 113 17.5.1 Post Closure Mine Landforms ......................................................................................................................... 114 17.5.2 Closure Criteria ............................................................................................................................................... 116 18 Capital and operating costs ............................................................................................................................................. 117 18.1 Capital costs ............................................................................................................................................................ 117 18.2 Operating costs ........................................................................................................................................................ 117 19 Economic analysis ............................................................................................................................................................. 119 19.1 Key inputs and assumptions .................................................................................................................................... 119 19.2 Economic analysis ................................................................................................................................................... 120 19.3 Breakdown of ESG expenditure .............................................................................................................................. 120 19.4 Sensitivity analysis 50 % Attributable .................................................................................................................... 120
P a g e 5 | 1 3 8 20 Adjacent properties .......................................................................................................................................................... 122 21 Other relevant data and information ............................................................................................................................. 123 22 Interpretation and conclusions ....................................................................................................................................... 125 22.1 Gruyere risks and mitigating actions ....................................................................................................................... 125 23 Recommendations ............................................................................................................................................................ 129 24 References .......................................................................................................................................................................... 130 25 Reliance on information provided by the registrant .................................................................................................... 131 26 Definitions .......................................................................................................................................................................... 132 26.1 Adequate geological evidence ................................................................................................................................. 132 26.2 Conclusive geological evidence .............................................................................................................................. 132 26.3 Cutoff grade ............................................................................................................................................................ 132 26.4 Development stage issuer ........................................................................................................................................ 132 26.5 Development stage property.................................................................................................................................... 132 26.6 Economically viable ................................................................................................................................................ 132 26.7 Exploration results .................................................................................................................................................. 132 26.8 Exploration stage issuer .......................................................................................................................................... 132 26.9 Exploration stage property ...................................................................................................................................... 132 26.10 Exploration target .................................................................................................................................................... 132 26.11 Feasibility study ...................................................................................................................................................... 133 26.12 Final market study ................................................................................................................................................... 133 26.13 Indicated Mineral resource ...................................................................................................................................... 133 26.14 Inferred Mineral resource ........................................................................................................................................ 133 26.15 Initial assessment .................................................................................................................................................... 133 26.16 Investment and market assumptions ........................................................................................................................ 133 26.17 Limited geological evidence ................................................................................................................................... 134 26.18 Material ................................................................................................................................................................... 134 26.19 Material of economic interest .................................................................................................................................. 134 26.20 Measured Mineral resource ..................................................................................................................................... 134 26.21 Mineral reserve ....................................................................................................................................................... 134 26.22 Mineral resource ..................................................................................................................................................... 134 26.23 Modifying factors .................................................................................................................................................... 134 26.24 Preliminary feasibility study (or pre-feasibility study) ............................................................................................ 135 26.25 Preliminary market study ........................................................................................................................................ 135 26.26 Probable Mineral reserve ........................................................................................................................................ 135 26.27 Production stage issuer ............................................................................................................................................ 135 26.28 Production stage property ....................................................................................................................................... 135 26.29 Proven Mineral reserve ........................................................................................................................................... 135 26.30 Qualified person ...................................................................................................................................................... 135 26.31 Relevant experience ................................................................................................................................................ 136
P a g e 6 | 1 3 8 List of Tables Table 1.4.1: Gruyere - summary of gold Mineral resources at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,500/oz ......................................................................................................................................................................................10 Table 1.5.1: Gruyere - summary of gold Mineral reserves at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,300/oz ......................................................................................................................................................................................11 Table 1.6.1: Capital costs ($ million) ......................................................................................................................................................................12 Table 1.6.2: Operating costs ($ million) ..................................................................................................................................................................12 Table 2.4.1: List of Qualified persons .....................................................................................................................................................................15 Table 3.4.1: Summary of Gruyere tenements ..........................................................................................................................................................16 Table 7.2.1: Summary total Gruyere Joint Venture exploration drilling – 2021 ....................................................................................................32 Table 7.4.1: Required number representative samples for laboratory testing ........................................................................................................36 Table 7.4.2: Summary of laboratory test results – I ................................................................................................................................................37 Table 7.4.3: Summary of laboratory test results – II ...............................................................................................................................................37 Table 7.4.4: Slope design configuration against geotechnical domains .................................................................................................................38 Table 7.5.1: Density by rock type ............................................................................................................................................................................39 Table 8.4.1: Quality control sample type summary ................................................................................................................................................45 Table 8.4.2: Laboratory audits 2021 ........................................................................................................................................................................46 Table 10.2.1: Summary of Gruyere average sample head analyses .......................................................................................................................52 Table 10.2.2: Summary of Golden Highway deposits samples average head analyses .........................................................................................53 Table 10.2.3: Summary of Gruyere pit metallurgical samples quantities and average recovery results ...............................................................55 Table 10.2.4: Summary of Gruyere pit assigned metallurgical recovery estimation models .................................................................................55 Table 10.2.5: Summary of Golden Highway metallurgical samples quantities and average recovery results ......................................................56 Table 10.2.6: Summary of assigned Golden Highway metallurgical recovery estimation models .......................................................................56 Table 10.2.7: Summary of Gruyere fresh ore samples SAG Work Index (Axb, Mia) test results .........................................................................58 Table 10.2.8: Summary of Gruyere fresh ore samples Ball Work Index (BWI, Mib) test results .........................................................................58 Table 10.2.9: Summary of Golden Highway and Gruyere fresh ore samples hardness test results .......................................................................60 Table 10.2.10: Summary of Gruyere and Golden Highway abrasion index test results ........................................................................................61 Table 11.1.1: Summary of December 2021 Mineral resource estimation parameters ...........................................................................................66 Table 11.1.2: Gruyere open pit resource cut-off grades ..........................................................................................................................................67 Table 11.1.3: Gruyere resource classification criteria by area ................................................................................................................................69 Table 11.2.1: Gruyere - summary of gold Mineral resources at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,500/oz ..................................................................................................................................................................................71 Table 12.2.1: Gruyere – recent production performance ........................................................................................................................................74 Table 12.2.2: Gruyere – key modifying factors ......................................................................................................................................................74 Table 12.2.3: Gruyere open pit reserve cut-off grades ............................................................................................................................................76 Table 12.2.4: Equipment availability, utilisation and productivity assumptions for LoM planning ......................................................................77 Table 12.3.1: Gruyere - summary of gold Mineral reserves at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,300/oz ......................................................................................................................................................................................80 Table 12.5.1: Net difference in Mineral reserves between 31 December 2020 and 31 December 2021 ...............................................................82 Table 13.1.1: Mining equipment major fleet numbers ............................................................................................................................................83 Table 13.2.1: Gold Fields acceptance criteria for open pit design inclusive of typical factor of safety and probability of failure .......................87 Table 14.3.1: Process plant – key requirements summary ......................................................................................................................................91 Table 15.1.1: Life of Mine Reserve TSF storage balance .......................................................................................................................................95 Table 15.2.1: Likely Composition of Mine Waste Material ...................................................................................................................................95 Table 15.2.3: Materials Balance for Fresh, Competent Rock (Mm3) ....................................................................................................................96 Table 15.2.4: Waste Rock Dump Design Criteria for the Gruyere Gold Project ...................................................................................................96 Table 16.1.1: Reserve and Resource metal prices ...................................................................................................................................................99 Table 17.1.1: List of Gruyere permits .................................................................................................................................................................. 103 Table 17.2.1: Flora and Fauna .............................................................................................................................................................................. 104 Table 17.3.1: Available freeboard ........................................................................................................................................................................ 110 Table 17.3.2: Summary of Monitoring Commitments ......................................................................................................................................... 112
P a g e 7 | 1 3 8 Table 17.5.1:Gruyere Gold Mine Closure Domains ............................................................................................................................................ 114 Table 18.1.1: Capital costs ($ million) ................................................................................................................................................................. 117 Table 18.2.1: Operating costs ($ million) ............................................................................................................................................................. 117 Table 18.2.2: Closure and holding cost post life of mine reserves ...................................................................................................................... 118 Table 19.1.1: Gruyere Mineral reserve LoM plan ............................................................................................................................................... 119 Table 19.2.1: Gold Fields 50 % Attributable Gold, FCF and NPV ..................................................................................................................... 120 Table 19.3.1: Breakdown of ESG expenditure included in tables 18.1, 18.2 and 19,1 100 % basis .................................................................. 120 Table 19.4.1: NPV sensitivity to changes in gold price ....................................................................................................................................... 120 Table 19.4.2: NPV sensitivity to changes in grade .............................................................................................................................................. 120 Table 19.4.3: NPV sensitivity to changes in capital costs.................................................................................................................................... 120 Table 19.4.4: NPV sensitivity to changes in operating costs ............................................................................................................................... 121 Table 19.4.5: NPV sensitivity to changes in discount rate ................................................................................................................................... 121 Table 22.1.1: Gruyere risks and mitigating actions .............................................................................................................................................. 125 List of Figures Figure 1.2.1: Location of Gruyere .............................................................................................................................................................................9 Figure 3.4.1: Gruyere mineral titles .........................................................................................................................................................................16 Figure 4.4.1: Gruyere operating sites and infrastructure .........................................................................................................................................23 Figure 6.1.1: Gruyere – regional geology ...............................................................................................................................................................26 Figure 6.1.2: Local geology of the Gruyere area.....................................................................................................................................................27 Figure 6.2.1: Gruyere stratigraphic column ............................................................................................................................................................29 Figure 6.2.2: Gruyere Geological Section – Looking North ...................................................................................................................................30 Figure 7.2.1: Gruyere Exploration Drilling Phases .................................................................................................................................................35 Figure 8.3.1: Sample preparation workflow for RC and AC samples ....................................................................................................................43 Figure 8.3.2: Sample preparation workflow for diamond core samples .................................................................................................................44 Figure 10.2.1: Comparison of Gruyere fresh ore recovery estimation model with test-work recoveries ..............................................................55 Figure 10.2.2: Gruyere fresh ore samples – SAG work index versus Ball work index(1) (BWI) plot ....................................................................59 Figure 13.1.1:Final Reserve outlines .......................................................................................................................................................................85 Figure 14.1.1: Schematic flow diagram of the Gruyere process plant ....................................................................................................................90 Figure 15.1.1: Location of the TSF relative to the pit and processing plant ...........................................................................................................94 Figure 17.3.1: VWP locations .......................................................................................................................................................................... 108 Figure 17.3.2: TSF monitoring bore locations (25 July 2020) ............................................................................................................................. 109 Figure 17.5.1: Location of Regional Mine Closure Domains .............................................................................................................................. 115 Figure 17.5.2: Location of Central Mine Closure Domains................................................................................................................................. 115
P a g e 8 | 138 1 Executive Summary This technical report summary was prepared for Gold Fields Limited (Gold Fields or the Company or the Registrant), a production stage issuer. The purpose of this technical report summary is to support the disclosure of exploration results, Mineral resources and Mineral reserves for the Gruyere Gold Mine (Gruyere), a production stage property located in Australia, in accordance with the Securities and Exchange Commission (SEC) property disclosure requirements for mining registrants as specified in Subpart 229.1300 of Regulation S-K - Disclosure by Registrants Engaged in Mining Operations. The effective date of this technical report summary is 31 December 2021. Unless otherwise specified, all units of currency are in United States dollars (US$). All measurements are metric with the exception of troy ounces (oz). 1.1 Property description and ownership Gruyere is located approximately 1,100 kilometres (km) northeast of Perth, the capital of Western Australia (Figure 1.2.1). Gruyere is an unincorporated 50:50 joint venture (the Gruyere Joint Venture or Gruyere Joint Venture) between Gruyere Mining Company Pty Ltd (a wholly owned subsidiary of Gold Fields) and Gold Road (Gruyere) Pty Ltd (a wholly owned subsidiary of Gold Road Resources Ltd). Gold Fields is the manager of the Gruyere Joint Venture through its wholly owned subsidiary Gruyere Management Pty Ltd (GMPL). The Gruyere Joint Venture has ownership of 12 granted Mining Leases, 1 granted Exploration License, 52 granted Miscellaneous Licenses and 2 granted Prospecting Licences covering an area of 138,893 ha. The major components of the Gruyere mining and processing operation are: One operating open pit. An 8.2 Mt/a carbon-in-leach (CIL) process plant. A tailings storage facility (TSF). A power station with gas pipeline and power distribution lines. An accommodation village. An airstrip. Administration centers and workshops. Two borefields. 1.2 Geology and mineralisation Gruyere is situated in the central part of the Dorothy Hills Greenstone Belt, a greenstone sub‐basin in the northeast portion of the Yamarna Greenstone Belt. The Yamarna and Dorothy Hills Greenstone Belts are the easternmost known greenstone belts of the Archean Yilgarn Craton in southern Western Australia.
P a g e 9 | 1 3 8 Figure 1.2.1: Location of Gruyere Source: Gruyere CPR, 2021 Gruyere is an orogenic gold deposit hosted by a quartz monzonite porphyry on a flexure point in the regional-scale Dorothy Hills Shear Zone. The mineralised strike length is 2,200 m with a known vertical extent of over 1,100 m. The host monzonite porphyry averages 90 m in horizontal width through the deposit with a maximum width of 190 m in the centre tapering to between 5 m and 10 m width at the northern and southern extremities. The monzonite porphyry dips steeply (65° - 80°) to the east and is variably altered with gold grades related to variations in the style and intensity of alteration, structure, quartz veining and sulphide species. Yam14 is located 8 km south of the Gruyere deposit on a flexure of the Dorothy Hills Shear Zone. Mineralisation is shear-related and hosted in an intermediate sedimentary package at the contact with a rhyolitic tuff. Elevated gold grades are associated with shearing, increased quartz veining and albite-chlorite-pyrite-arsenopyrite alteration. Gold mineralisation along the Yamarna Greenstone Belt in the west of the Property (Attila, Alaric, Montagne, Argos and Orleans deposits) is hosted in a steeply dipping sequence of sheared felsic to mafic volcanic and sedimentary rocks. 1.3 Exploration, development and operations Open pit mining of the Gruyere deposit commenced in late 2018. The first gold pour was achieved in June 2019. Mining is by conventional drill and blast with truck and shovel using contract mining. The recent production performance of Gruyere is summarised in Section 12.2.1.
P a g e 1 0 | 1 3 8 During 2021, exploration completed within the Gruyere Joint Venture mining lease was managed by Goldfields as part of its extensive Gruyere Deeps exploration program. This is discussed in more detail in Section 7 of this report. 1.4 Mineral resource estimates The Gruyere Mineral resources exclusive of Mineral reserves as of 31 December 2021 are summarised in Table 1.4.1. The Mineral resources are 50 % attributable to Gold Fields and are net of production depletion up to 31 December 2021. The point of reference for the Mineral resources is in-situ without dilution applied. Table 1.4.1: Gruyere - summary of gold Mineral resources at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,500/oz Resources (exclusive of Mineral reserves) Cut-off grades/ (g/t Au) Metallurgical recovery/ (%) Amount/ (kt) Grades/ (g/t Au) Amount/ (koz Au) Open Pit Mineral resources OP measured Mineral resources 46 1.0 1 0.4 to 0.7 81 to 95 OP indicated Mineral resources 13,886 1.4 610 0.4 to 0.7 81 to 95 OP measured + indicated Mineral resources 13,932 1.4 611 0.4 to 0.7 81 to 95 OP inferred Mineral resources 17,730 1.4 781 0.4 to 0.7 81 to 95 Underground Mineral resources UG measured Mineral resources UG indicated Mineral resources UG measured + indicated Mineral resources UG inferred Mineral resources 121 13 51 0.4 to 0.7 81 to 95 Stockpile Mineral resources SP measured Mineral resources SP indicated Mineral resources SP measured + indicated Mineral resources SP inferred Mineral resources Total Gruyere Mineral resources Total Measured Mineral resources 46 1.0 1 81 to 95 Total Indicated Mineral resources 13,886 1.4 610 81 to 95 Total Measured + Indicated Mineral resources 13,932 1.4 611 81 to 95 Total Inferred Mineral resources 17,851 1.4 832 81 to 95 Notes: a) Rounding of figures may result in minor computational discrepancies. b) Mineral resources are exclusive of Mineral reserves. c) No year on year Mineral resource comparison is presented as Gruyere did not disclose a Mineral resource in 2020. d) Quoted as diluted in situ metric tonnes and grades. Metallurgical recovery factors have not been applied to the Mineral resource estimates. The approximate metallurgical recovery factor of 81 % to 95 %. The metallurgical recovery is the ratio, expressed as a percentage, of the mass of the specific mineral product recovered from ore treated at the process plant to its total specific mineral content before treatment. Gruyere mining operations vary according to the mix of the source material (e.g. oxide, transitional, fresh and ore type blend). e) The metal prices used for the 2021 Mineral resources are based on a gold price of $1,500 per ounce or A$2,000 per ounce (at an exchange rate of A$ 1:$0.75). Open pit Mineral resources at the Australian operations are based on revenue factor 1 pits and the underground Mineral resources on appropriate mine design and extraction schedules. The gold price used for Mineral resources approximates 15 % higher than the selected Mineral reserve. f) The cut-off grade may vary per shaft, open pit or underground mine, depending on the respective costs, depletion schedule, ore type, expected mining dilution and expected mining recovery. The average or range of cut-off grade values applied to the Mineral resources are; Gruyere 2.3 g/t to 3.9 g/t Au mill feed (underground) and 0.41 g/t to 0.66 g/t Au (open pit). g) The Mineral resources are based on initial assessments at the resource gold price of $1,500/oz and consider estimates of all Gruyere costs, the impact of modifying factors such as mining dilution and mining recovery, processing recovery and royalties. Mineral resources are also tested through the application of Environmental, Social and Governance (ESG) criteria to demonstrate reasonable prospects for economic extraction. h) The Mineral resources are estimated at a point in time and can be affected by changes in the gold price, US Dollar currency exchange rates, permitting, legislation, costs and operating parameters Source: Gruyere CPR, 2021
P a g e 1 1 | 1 3 8 The Mineral resources are based on initial assessments at the resource gold price of $1,500/oz and consider estimates of all Gruyere costs, the impact of modifying factors such as mining dilution and recovery, processing recovery and royalties to demonstrate reasonable prospects for economic extraction. 1.5 Mineral reserve estimates The Gruyere Mineral reserves as of 31 December 2021 are summarised in Table 1.5.1. The Mineral reserves are 50 % attributable to Gold Fields and are net of production depletion up to 31 December 2021. The point of reference for the Mineral reserves is ore delivered to the processing facility. Table 1.5.1: Gruyere - summary of gold Mineral reserves at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,300/oz Amount/ (kt) Grades/ (g/t Au) Amount/ (koz Au) Cut-off grades/ (g/t Au) Metallurgical recovery/ (%) Open Pit Mineral reserves OP Proven Mineral reserves 5,706 1.2 217 0.4 to 0.7 81 to 95 OP Probable Mineral reserves 46,176 1.3 1,946 0.4 to 0.7 81 to 95 OP total Mineral reserves 51,881 1.3 2,163 0.4 to 0.7 81 to 95 Stockpile Mineral reserves SP Proven Mineral reserves 2,667 0.73 63 81 to 95 SP Probable Mineral reserves SP total Mineral reserves 2,667 0.73 63 Total Mineral reserves Total Proven Mineral reserves 8,372 1.0 280 0.4 to 0.7 81 to 95 Total Probable Mineral reserves 46,176 1.3 1,946 0.4 to 0.7 81 to 95 Total Gruyere Mineral reserves 2021 54,548 1.3 2,226 0.4 to 0.7 81 to 95 Total Gruyere Mineral reserves 2020 43,425 1.2 1,738 Year on year difference (%) 26% 2% 28% Notes: a) Rounding of figures may result in minor computational discrepancies. b) Refer to c) Table 12.5.1 for year on year for a detailed Mineral reserve comparison d) Quoted as mill delivered metric tonnes and run-of-mine (RoM) grades, inclusive of all mining dilutions and gold losses except mill recovery. Metallurgical recovery factors have not been applied to the reserve figures. The approximate metallurgical recovery factor is 81 % to 95 %. The metallurgical recovery is the ratio, expressed as a percentage, of the mass of the specific mineral product recovered from ore treated at the process plant to its total specific mineral content before treatment. The recoveries for Gruyere vary according to the mix of the source material (e.g. oxide, transitional fresh and ore type blend) and method of treatment. e) The metal prices used for the 2021 LoM Mineral reserves are based on a gold price of $1,300 per ounce or A$1,750 per ounce (at an exchange rate of A$1:$0.74). Open pit Mineral reserves at Gruyere are based on optimized pits and the underground operations on appropriate mine design and extraction schedules. The gold price used for Mineral reserves is detailed in particularity in chapter 16 Marketing. f) Dilution relates to planned and unplanned waste and/or low-grade material being mined and delivered to the process plant. Ranges are given for those operations that have multiple orebody styles and mining methodologies. The mine dilution factors are 4 % to 31 % (open pit). g) The mining recovery factor relates to the proportion or percentage of ore mined from the defined orebody at the gold price used for the declaration of Mineral reserves. This percentage will vary from mining area to mining area and reflects planned and scheduled reserves against actual tonnes, grade and metal mined, with all modifying factors, mining constraints and pillar discounts applied. The mining recovery factors are 89 % to 98 %. h) The cut-off grade may vary per shaft, open pit or underground mine, depending on the respective costs, depletion schedule, ore type, expected mining dilution and expected mining recovery. The average or range of cut-off grade values applied in the planning process are: Gruyere 0.4 g/t to 0.7 g/t Au. i) An ounces-based Mine Call Factor (metal called for over metal accounted for) determined primarily on historic performance but also on realistic planned improvements where appropriate is applied to the Mineral reserves. A Mine Call Factor of 100 % has been applied at Gruyere. j) The Mineral reserves are estimated at a point in time and can be affected by changes in the gold price, US Dollar currency exchange rates, permitting, legislation, costs and operating parameters. k) Gruyere is 50 % attributable to Gold Fields and is entitled to mine all declared material located within the properties mineral leases and all necessary statutory mining authorizations and permits are in place or have reasonable expectation of being granted. l) Increases in Mineral reserves at Gruyere are primarily due to increases in the designed pit wall angles following a feasibility study in 2021 resulting in additional Resource to Reserve conversion. Source: Gruyere CPR, 2021
P a g e 1 2 | 1 3 8 The Gruyere Mineral reserves are the economically mineable part of the measured and indicated Mineral resources based on LoM schedules and pre-feasibility studies completed at the reserve gold price of $1,300/oz to justify their economic viability at 31 December 2021 (refer to Section 19 for details on the supporting economic analysis). 1.6 Capital and operating cost estimates Project development and the establishment of infrastructure at Gruyere is complete. Ongoing capital costs for the 31 December 2021 Mineral reserve LoM plan are summarized in Table 1.6.1. Table 1.6.1: Capital costs ($ million) Capital cost Units 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Capital $ million 62.3 136.3 115.9 121.7 110.5 171.8 161.3 167.7 9.4 8.0 6.9 0.6 Notes: a) The detailed capital cost schedule is presented in Table 18.1.1 b) This capital summary estimate is for the Mineral reserve life of mine schedule c) Closure cost are included in operating costs Source: Gruyere CPR, 2021 Budgeted operating costs are summarized in Table 1.6.2. Table 1.6.2: Operating costs ($ million) Operating cost Units 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 operating costs $ million 209.9 187.3 204.2 192.2 203.8 193.2 243.1 204.7 250.9 197.3 152.2 5.6 Notes: a) The detailed operating cost schedule is presented in Table 18.2.1 b) This operating cost summary estimate is for the Mineral reserve LoM schedule c) Closure costs are presented from 2033 onwards Source: Gruyere CPR, 2021 1.7 Permitting The key operating environmental permits for the operation are issued by DMIRS and DWER and relate to: Mining Proposal which includes land clearing, disturbance and infrastructure Environmental licence Native vegetation clearing Mine dewatering (category 06) Water abstraction and groundwater operating strategies Sewerage facility (category 54) Putrescible landfill site; and Mine Closure Plan The operation has these permits in place and manage the obligations through the INX InForm (legal register process). In Australia, with few exceptions, all onshore mineral rights are reserved to the government of the relevant state or territory. The Western Australian Mining Act 1978 (WA) (the “WA Mining Act”), is the principal piece of legislation governing exploration and mining on land in Western Australia. Licenses and leases for, among other things, prospecting, exploration and mining must be obtained pursuant to the requirements of the WA Mining Act before the relevant activity can begin. Where native title has not been extinguished, native title legislation may apply to the grant of tenure and some subsequent administrative processes. Heritage legislation may operate to preclude or regulate the disturbance of a particular area.
P a g e 1 3 | 1 3 8 The maximum initial term of a mining lease is 21 years and the holder has the right to renew the lease for a further period of 21 years. Subsequent renewals are subject to the minister’s discretion and the lease can only be assigned with the consent of the relevant minister. A general-purpose lease may also be granted for one or more of a number of permitted purposes. There are minimum expenditure requirements for most types of tenure, to ensure ongoing activity is undertaken and reported. Current leases are due for renewal over the period, E38/1964 and P38/4401. Gold Fields maintains a tenement management auditing system that flags lease renewals to meet the renewal process timeline and to keep the tenement ownership in good standing by meeting expenditure and other commitments. Gruyere has security of tenure for all current exploration and mining leases that contribute to future ore reserves in this CPR. If mining expansion is required into additional areas currently held under exploration, it would need to convert the relevant exploration licenses prior to commencing mining. This would also include negotiations with the relevant native title holders in order to obtain their consent to any proposed grant. In 2017, the Yilka People and Sullivan Edwards families were successful in having their claim under the Native Title Act 1993 (Cth) (WCD2017/005) determined by the Federal Court over an area including the Gruyere mine. GRM is party to an agreement with the Yilka People that gives the necessary consents for the grant of mining and other tenure at Gruyere. 1.8 Conclusions and recommendations The Gruyere Mineral reserves currently support a 12 year life of mine reserve plan which includes two years of stockpile processing that values the operation at $437.3 million at the reserve gold price of $1,300/oz. k). Increases in Mineral reserves at Gruyere are primarily due to increases in the designed pit wall angles following a feasibility study in 2021 resulting in additional Resource to Reserve conversion.
P a g e 1 4 | 1 3 8 2 Introduction 2.1 Registrant for whom the technical report summary was prepared This technical report summary was prepared for Gold Fields Limited (Gold Fields or the Company or the Registrant), a production stage issuer. 2.2 Terms of reference and purpose of the technical report summary The purpose of this technical report summary is to support the disclosure of exploration results, Mineral resources and Mineral reserves for the Gruyere Gold Mine (Gruyere or the Property), a production stage property located in Australia, in accordance with the Securities and Exchange Commission (SEC) property disclosure requirements for mining registrants as specified in Subpart 229.1300 of Regulation S-K - Disclosure by Registrants Engaged in Mining Operations. The effective date of this technical report summary is 31 December 2021. The Mineral resources and Mineral reserves disclosed in this technical report summary were reported in accordance with the South African Code for the Reporting of Exploration Results, Mineral resources and Mineral reserves (SAMREC Code 2016). SAMREC is based on the Committee for Mineral reserves International Reporting Standards (CRIRSCO) Reporting Template 2019. 2.3 Sources of information This technical report summary is principally based on information disclosed in the “Competent Person’s Report on the Material Assets of Gruyere Gold Mine as at 31 December 2021” prepared by Gruyere management on behalf of the Company. The Competent Person’s Report (CPR) was supplemented by technical reports and studies prepared by the Company and third-party specialists engaged by the Company as cited throughout this technical report summary and listed in Section 24. All units of currency are in United States dollars ($) unless otherwise specified. All measurements are metric with the exception of troy ounces (oz). 2.4 Qualified persons and details of inspection The Qualified persons responsible for the preparation of this technical report summary are listed in Table 2.4.1. All Qualified persons are eligible members in good standing of the South African Mineral Reporting Codes (SAMREC 2016) recognized professional organization (RPO) register within the mining industry. They have at least five years of relevant experience in the type of mineralization and type of deposit under consideration and in the specific type of activity that the Qualified person is undertaking on behalf of the Company at the time this technical report summary was prepared.
P a g e 1 5 | 1 3 8 Table 2.4.1: List of Qualified persons Incumbent Employer Position Affiliations Relevant experience (years) Details of inspection Responsibility Dr Julian Verbeek Gold Fields VP Geology and Mineral resources FAusIMM - 207994 34 Has not attended site This document has been prepared under the supervision of and reviewed by Julian Verbeek. Chapters 1-26 Richard Butcher Gold Fields Chief Technical Officer GFL Group Technical Services FAusIMM CP - 211182 41 11 Mar 2021 11 Oct 2021 Overview and review of document. Chapters 1-5, 10 & 12-26 Dr Winfred Assibey-Bonsu Gold Fields Group Geostatistician and Evaluator FSAIMM - 400112/00 35 Has attended site Resources Estimation Chapters 8 - 9 & 11 Andrew Engelbrecht Gold Fields Group Geologist AusIMM - 224997 22 Has not attended site Geology and Resources. Chapters 1 - 11 Peter Andrews Gold Fields VP: Geotechnical FAusIMM CP - 302255 25 Has attended site Geotechnical review. Sections 7.4, 15.2 & 17.3.2 Daniel Hillier Gold Fields VP: Metallurgy FAusIMM CP - 227106 31 Has not attended site Chapters 10 & 14 Johan Boshoff Gold Fields Group Head of Tailings FAusIMM - 1007564 26 18 Feb 2021 12 Jun 2021 5 Aug 2021 Tailings Review. Sections 15.1 & 17.3.1 Andre Badenhorst Gold Fields Group Technical and Reporting Governance Manager AusIMM - 309882 41 Has attended site Chapters 1-26 Fiona Phillips Gold Fields VP: Technical AusIMM - 112538 24 Twice a year Overview and review of document. Chapters 1-5, 10 & 12-26 Trent Strickland Gold Fields Principal Geologist: Resources & Reserves AusIMM - 211953 AIG - 6761 17 Twice a year Geology and Resources. Chapters 1 - 11 Marco Tassone Gold Fields Manager: Geology AusIMM - 3000317 26 Site employee Chapters 1-26 Hamish Guthrie Gold Fields Mine Planning Superintendent AusIMM - 210899 22 Once a quarter Reserves and Mining Chapters 1-5, 10 & 12-26 Mark Roux Gold Fields Resource Geology Superintendent AusIMM - 324099 15 Once a quarter Resources Estimation Chapters 8 - 9 & 11 Notes a) The Qualified persons where not all able to attend site in 2021 for Mineral reserve and Mineral resource reviews, however, the Mineral reserve and Mineral resource were reviewed according to the chapter 21 description. The recognized professional organization affiliation in good standing has been reviewed by Gold Fields. The Qualified persons have been appointed by Gold Fields 2.5 Report version update No previous technical report summary has been filed by the Gold Fields on the Gruyere property in Western Australia. Gruyere is sometimes referred to as the Gruyere Joint Venture.
P a g e 1 6 | 1 3 8 3 Property description 3.1 Property location Gruyere is located in the North Eastern Goldfields 1,100 km northeast of Perth, the capital of Western Australia (Figure 1.2.1), at 27º59’04”S and longitude 123º50’43”E or GDA94 / MGA Zone 51 coordinates 583,115E and 6,904,206N. Refer to Figure 4.4.1 for Gruyere operating sites and infrastructure drawing. 3.2 Ownership Gruyere is an unincorporated 50:50 joint venture (the Gruyere Joint Venture or Gruyere Joint Venture) between Gruyere Mining Company Pty Ltd (a wholly owned subsidiary of Gold Fields) and Gold Road (Gruyere) Pty Ltd (a wholly owned subsidiary of Gold Road Resources Ltd, ASX: GOR). Gold Fields is the manager of the Gruyere Joint Venture through its wholly owned subsidiary Gruyere Management Pty Ltd (GMPL). Under the terms of the Gruyere Joint Venture, Gold Road Resources received a A$250 million cash consideration, payment of a further A$100 million to fund Gold Road Resources’ share of the initial cash calls during the construction phase, and an uncapped 1.5 % net smelter return (NSR) royalty on Gold Fields’ 50 % share of production from the Gruyere Joint Venture tenements once total gold production exceeded two million ounces. 3.3 Property area The Gruyere Joint Venture tenements cover a total area of 138,893 ha. The Gruyere Joint Venture has security of tenure for all current exploration and mining tenements that contribute to future Mineral resources and reserves. 3.4 Property mineral titles, claims, mineral rights, leases and options The Gruyere Joint Venture has 100 % ownership of 12 granted Mining Leases, 1 granted Exploration Licence, 52 granted Miscellaneous Licences and 2 granted Prospecting Licences covering a total area of 138,893 ha (Figure 3.4.1, Table 3.4.1). Figure 3.4.1: Gruyere mineral titles Source: Gruyere CPR, 2021 Table 3.4.1: Summary of Gruyere tenements
P a g e 1 7 | 1 3 8 Number Grant date Expiry date Area (HA – hectare) (BL = blocks) Min annual expenditure ($) Annual rent ($) Reporting group Term granted Mining Leases M38/1178 05-May-16 04-May-37 974.50000 HA $72,150 $15,873 Yamarna - C035/2017 21 Years M38/1179 02-Jun-16 01-Jun-37 874.95000 HA $64,750 $14,245 Yamarna - C035/2017 21 Years M38/1255 31-May-16 30-May-37 1,793.50000 HA $132,756 $29,206 Yamarna - C035/2017 21 Years M38/1267 05-May-16 04-May-37 6,855.00000 HA $507,270 $111,599 Yamarna - C035/2017 21 Years M38/435 10-Aug-04 09-Aug-25 770.20000 HA $57,054 $12,552 Yamarna - C035/2017 21 Years M38/436 10-Aug-04 09-Aug-25 98.59000 HA $7,400 $1,612 Yamarna - C035/2017 21 Years M38/437 10-Aug-04 09-Aug-25 158.50000 HA $11,766 $2,589 Yamarna - C035/2017 21 Years M38/438 10-Aug-04 09-Aug-25 227.15000 HA $16,872 $3,712 Yamarna - C035/2017 21 Years M38/439 10-Aug-04 09-Aug-25 18.91500 HA $7,400 $309 Yamarna - C035/2017 21 Years M38/788 10-Aug-04 09-Aug-25 148.55000 HA $11,026 $2,426 Yamarna - C035/2017 21 Years M38/814 10-Aug-04 09-Aug-25 1,000.00000 HA $74,000 $16,280 Yamarna - C035/2017 21 Years M38/841 10-Aug-04 09-Aug-25 374.50000 HA $27,750 $6,105 Yamarna - C035/2017 21 Years Exploration Licences E38/1964 27-Aug-09 26-Aug-23 3 BL $37,000 $1,503 Yamarna - C035/2017 5 Years (Extended) E38/2326 04-Jun-10 03-Jun-22 8 BL $51,800 $4,008 Yamarna - C035/2017; Yamarna Central - C183/2020 5 Years (Extended) E38/2415 03-Nov-10 02-Nov-22 4 BL $37,000 $2,004 Yamarna - C035/2017; Yamarna Central - C183/2020 5 Years (Extended) Prospecting Licences P38/4196 04-Aug-16 03-Aug-24 136.00000 HA $4,026 $332 4 Years (Extended) P38/4197 04-Aug-16 03-Aug-24 111.00000 HA $3,286 $271 4 Years (Extended) P38/4198 04-Aug-16 03-Aug-24 49.00000 HA $1,480 $120 4 Years (Extended) P38/4401 14-Nov-17 13-Nov-21 36.50000 HA $1,480 $90 4 Years P38/4478 02-Sep-19 01-Sep-23 72.66000 HA $2,161 $178 4 Years Miscellaneous Licences L38/186 14-Aug-13 13-Aug-34 75.90000 HA $1,108 21 Years L38/210 16-May-13 15-May-34 59,562.30000 HA $26,446 21 Years L38/227 27-Sep-16 26-Sep-37 45.10000 HA $671 21 Years L38/230 27-Sep-16 26-Sep-37 9.58000 HA $146 21 Years L38/235 15-Jul-16 14-Jul-37 42,821.40000 HA $19,013 21 Years L38/250 24-Mar-17 23-Mar-38 12,406.69120 HA $180,869 21 Years L38/251 03-Oct-16 02-Oct-37 789.00000 HA $11,502 21 Years L38/252 08-May-17 07-May-38 3,057.25000 HA $44,580 21 Years L38/253 28-Feb-17 27-Feb-38 788.50000 HA $11,502 21 Years L38/254 27-Sep-16 26-Sep-37 568.80000 HA $8,295 21 Years L38/255 27-Sep-16 26-Sep-37 482.80000 HA $7,041 21 Years L38/256 03-Oct-16 02-Oct-37 189.90000 HA $2,770 21 Years L38/259 28-Sep-17 27-Sep-38 296.52000 HA $4,330 21 Years L38/260 22-May-17 21-May-38 664.20000 HA $9,694 21 Years L38/266 24-Mar-17 23-Mar-38 156.84070 HA $2,289 21 Years L38/267 24-Mar-17 23-Mar-38 217.41530 HA $3,178 21 Years L38/268 24-Mar-17 23-Mar-38 12.57090 HA $190 21 Years L38/269 24-Mar-17 23-Mar-38 178.15200 HA $2,609 21 Years L38/270 24-Mar-17 23-Mar-38 64.32800 HA $948 21 Years L38/271 24-Mar-17 23-Mar-38 133.48790 HA $1,953 21 Years L38/272 24-Mar-17 23-Mar-38 24.09690 HA $364 21 Years L38/273 24-Mar-17 23-Mar-38 133.45960 HA $1,953 21 Years L38/274 24-Mar-17 23-Mar-38 51.29330 HA $758 21 Years L38/275 24-Mar-17 23-Mar-38 270.20230 HA $3,951 21 Years
P a g e 1 8 | 1 3 8 Number Grant date Expiry date Area (HA – hectare) (BL = blocks) Min annual expenditure ($) Annual rent ($) Reporting group Term granted L38/276 30-Mar-17 29-Mar-38 371.12090 HA $5,423 21 Years L38/278 24-Mar-17 23-Mar-38 5.39020 HA $87 21 Years L38/279 24-Mar-17 23-Mar-38 4.80080 HA $73 21 Years L38/280 24-Mar-17 23-Mar-38 3.00660 HA $58 21 Years L38/281 24-Mar-17 23-Mar-38 1.66250 HA $29 21 Years L38/282 26-Apr-17 25-Apr-38 511.60000 HA $7,464 21 Years L38/283 08-May-17 07-May-38 348.40000 HA $5,088 21 Years L38/284 12-Sep-17 11-Sep-38 0.98100 HA $15 21 Years L38/285 12-Sep-17 11-Sep-38 6.12900 HA $102 21 Years L38/286 28-Sep-17 27-Sep-38 0.93600 HA $15 21 Years L38/293 09-Oct-17 08-Oct-38 7.70000 HA $117 21 Years L38/294 09-Oct-17 08-Oct-38 1.00000 HA $15 21 Years L38/295 09-Oct-17 08-Oct-38 1.00000 HA $15 21 Years L38/296 09-Oct-17 08-Oct-38 1.00000 HA $15 21 Years L38/297 09-Oct-17 08-Oct-38 41.20900 HA $612 21 Years L38/298 09-Oct-17 08-Oct-38 46.88700 HA $685 21 Years L38/299 09-Oct-17 08-Oct-38 1.51100 HA $29 21 Years L38/300 09-Oct-17 08-Oct-38 6.39100 HA $102 21 Years L38/301 09-Oct-17 08-Oct-38 15.28100 HA $233 21 Years L38/302 09-Oct-17 08-Oct-38 11.11000 HA $175 21 Years L38/303 09-Oct-17 08-Oct-38 63.39500 HA $933 21 Years L38/304 27-Oct-17 26-Oct-38 27.67300 HA $408 21 Years L38/305 09-Oct-17 08-Oct-38 22.40600 HA $335 21 Years L38/306 09-Oct-17 08-Oct-38 20.45300 HA $306 21 Years L38/307 09-Oct-17 08-Oct-38 4.77000 HA $73 21 Years L38/309 15-Jan-18 14-Jan-39 2.55600 HA $0 21 Years L38/310 27-Feb-18 26-Feb-39 1.00000 HA $15 21 Years L38/311 23-Mar-18 22-Mar-39 5.96500 HA $87 21 Years Notes: a) Registered Holder – Gruyere b) The Qualified persons opinion is that licenses and tenements can be renewed or extended as required Source: Gruyere CPR, 2021 3.5 Mineral rights description The operation of mining and associated activities at Gruyere are governed by numerous Western Australian Government Acts. This section summarises published information available from the Western Australian Department of Mines, Industry Regulation and Safety (DMIRS). The Western Australian Mining Act 1978 (WA) (the Mining Act (1978)) is the principal legislation governing exploration and mining on land in Western Australia. Licenses and leases for, among other things, prospecting, exploration and mining must be obtained pursuant to the requirements of the Mining Act (1978) before the relevant activity can begin. Application fees and annual rental payments are payable in respect of each tenement. Where Native Title has not been extinguished, Native Title legislation may apply to the grant of tenure and some subsequent administrative processes. Heritage legislation may operate to preclude or regulate the disturbance of a particular area. Prospecting licences are granted over a maximum area of 200 ha and have an initial period of four years and can be extended by one period of four years. Exploration Licences are granted over larger areas for five years plus a possible extension of five years and further periods of two years thereafter, with 40 % per cent of ground to be surrendered at the end of year six.
P a g e 1 9 | 1 3 8 If the holder of a Prospecting or Exploration Licence establishes indications of an economic mineral deposit and expends a minimum level of investment, it may apply for a Mining Lease which gives the holder exclusive mining rights with respect to all minerals on the property. It is possible for one person to own the surface of the property and for another to own the mineral rights. An application for a Mining Lease must be accompanied by one of the following: A Mining Proposal completed in accordance with the guidelines. A statement of mining operations and a mineralisation report prepared by a Qualified person. A statement of mining operations and a resource report that complies with the JORC Code that has been made to the Australian Securities Exchange (ASX). The maximum initial term of a Mining Lease is 21 years and the holder has the right to renew the lease for a further period of 21 years. Subsequent renewals are subject to the minister’s discretion and the lease can only be assigned with the consent of the relevant minister. Prescribed minimum annual expenditure commitments and activity reporting requirements apply to holders of Exploration and Prospecting Licences, and Mining Leases. Mining operations on tenements in Western Australia must be developed and operated in compliance with various Commonwealth and State legislative requirements. The operation of Gruyere is under the control of the following Western Australian Government legislation. Mining Act (1978) Environmental Protection Act (1986) and Environmental Protection Amendment Act (2004) Contaminated Sites Act (2003) Environmental Protection (Clearing of Native Vegetation) Regulations (2004) Rights in Water and Irrigation Act (1914) Conservation and Land Management Act (1984) Wildlife Conservation Act (1950) Country Areas Water Supply Act (1947) Aboriginal Heritage Act (1972) Heritage of Western Australia Act (1990) Environmental Protection Regulations (1987) Environmental Protection (Unauthorized Discharge) Regulations (2004) Mining Rehabilitation Fund Act (2012) The operation of Gruyere is also under the authority of the following Commonwealth of Australia Government legislation. Environmental Protection and Biodiversity Conservation Act (1999) National Greenhouse and Energy Reporting Act (2007) The governing Western Australian agencies are the Department of Water and Environmental Regulation (DWER), the Department of Planning, Lands and Heritage (DPLH) and the DMIRS. Miscellaneous Licences are for purposes such as a roads and pipelines.
P a g e 2 0 | 1 3 8 Mineral royalty rates are prescribed under the Mining Regulations 1981. For gold, an ad valorem royalty rate of 2.5 % is applied. Gruyere also holds regulatory licences, permits and registrations that govern various aspects of environmental management as disclosed in Section 17. 3.6 Encumbrances Other regulatory requirements including those associated with the operation and management of mining, rehabilitation and exploration activities are managed under the Mining Act (1978) in the form of tenement conditions administered by the DMIRS. Section 17 discloses the remediation and reclamation guarantees that are pertinent to Gruyere. Gruyere did not incur any fines or other encumbrances for non-compliance or breaches in 2021. 3.7 Other significant factors and risks Under the terms of the Gruyere Joint Venture, an uncapped 1.5 % NSR royalty on Gold Fields’ 50 % share of production from the Gruyere Joint Venture tenements is payable to Gold Road Resources once total gold production has exceeded two million ounces. A 0.8 % gold production royalty is also payable pursuant to a Native Title agreement. There are no significant factors and risks that may affect access, title, or the right or ability to perform work on the Property. The Qualified person has relied on information provided by the Registrant in preparing its findings and conclusions regarding other significant factors and risks. In the Qualified person has considered all information that is rely upon opinion it reasonable to rely upon the Registrant for any of the identified information. If mine expansions are required into areas currently held under a Prospecting or Exploration Licence, conversion to a Mining Lease is required prior to commencing mining. Other permitting and licensing requirements required to start a new mining operation may include inter alia; Native Title, heritage, local disturbance, clearing, environmental, power, water extraction and waste disposal, which follow well established authorization protocols with the relevant Government authorities. The Qualified person is not aware of any other current or pending licensing or legal matters that may have an influence on the rights to explore or mine for minerals at Gruyere. The Qualified person has relied on information provided by the Registrant in preparing its findings and conclusions regarding other significant factors and risks. A review of recent Company public disclosure documents including the annual report (Form 20-F for the 12 months Ended 31 December 2021) do not contain any statements by the directors on any legal proceedings or other material conditions (other than as set out above) that may impact on the Company’s ability to continue mining or exploration activities at Gruyere. 3.8 Royalties or similar interest There are no non managed tenements, and there are no royalties or similar interests The Qualified person has reviewed the limited non-managed tenements and is of the opinion that it has not been explored on in 2021. Any discoveries will be considered as attributable to Gold Fields
P a g e 2 1 | 1 3 8 4 Accessibility, climate, local resources, infrastructure and physiography 4.1 Topography, elevation, and vegetation Gruyere lies at the western margin of the Great Victoria Desert, which is characterised by a semi-arid climate, with hot summers and mild winters. It consists of a predominantly flat landscape, truncated by the Yeo paleo-drainage valley. The region is covered by an extensive sandplain with areas of low longitudinal dunes. The upland terrain comprises isolated low hills and ridges that typically represent bedrock outcrops of mafic or felsic rocks, banded iron formation or granite tors attaining a elevation of around 400 – 500 m above sea level (ASL). Botanica Environmental Consultants were engaged by Gold Road to undertake two Level 2 desktop and field flora and vegetation surveys of the Gruyere Gold Project Mining area (M38/1267). Surveys were undertaken in spring 2014 and autumn 2015 covering 6,846 and 4,793 ha respectively. Thirty-seven broad vegetation communities were identified during the spring 2014 survey, representing a total of 39 families, 85 genera and 199 plant taxa (Botanica 2015a). A total of 240 vascular plant taxa from 44 families and 104 genera were recorded during the autumn 2015 survey area with 32 vegetation communities being mapped in the study area (2015b). There was a high degree of homogeneity between the Acacia forests and woodlands/shrublands and mallee woodlands and shrublands of the breakaway, clay-loam plain, quartz/rocky plain, drainage depression and rocky hill slope groups despite obvious differences in landform structure. The sandplain communities were mainly distinguished from the breakaway, clay-loam plain, quartz/rocky plain, drainage depression and rocky hill slope. There were also differences within the sandplain communities with the Acacia forest and woodland/shrubland sandplain communities mostly separated from the Eucalypt woodland/mallee woodland and shrubland sandplain communities. Species composition of the sand dune community was similar to that of the Eucalypt woodland/mallee woodland and shrubland sandplain communities (Botanica 2015b). Based on the Keighery vegetation health rating scale (1994) all vegetation communities were rated as ‘very good’ (Botanica 2015b), which is defined as ‘the vegetation structure is altered by obvious signs of disturbance for example, disturbance to vegetation structure caused by repeated fires, the presence of some more aggressive weeds, dieback, logging and grazing’. Disturbances within the Gruyere Gold Project area were noted to be exploration activities, fire and grazing by stock and feral camels. Topsoil and vegetation stripped from most areas to be disturbed for the project will be returned to the place that they were stripped from, generally maintaining any landform, soil and vegetation associations (aside from the pit footprint, which will never be restored). Topsoil, vegetation and growth medium stripped from the footprint of the pit and IWL will be placed on an artificial landform (the IWL), with sands from sandplains and dunes favoured for the top of the IWL, and gravelly loams from clay/loam plains, quartz rocky plains and low rocky hills favoured for the batters of the landform. The project area is not located within Environmentally Sensitive Areas or Schedule 1 Areas, as described in Regulation 6 and Schedule 1, clause 4 of the Environmental Protection (Clearing of Native Vegetation) Regulations 2004 (Botanica 2016a). The project area is not located within any DBCA managed land; however the Yeo Lake Nature Reserve which is listed as a Class “A” Nature Reserve and is managed by DBCA is located approximately 13 km to the east of the Gruyere Gold Project. None of the vegetation communities were found to have National Environmental Significance as defined by the Commonwealth EPBC Act (Botanica 2015b). The Qualified person’s opinion is that the revegetation proposed will adequately remediate any disturbance to the satisfaction of the community and authorities and the revegetation of tailings facilities will be in line with Company procedures and will minimize toxins.
P a g e 2 2 | 1 3 8 4.2 Access Access to Gruyere from the regional city of Kalgoorlie-Boulder is via the Goldfields Highway to the town of Leonora and the sealed Laverton-Leonora Road to Laverton followed by approximately 160 km along the unsealed Great Central Road (Figure 1.2.1). The mine site is serviced by regular chartered flights from Perth using the sealed airstrip located adjacent to the Gruyere village. 4.3 Climate The mean daily maximum temperature is 35.8°C in January and 17.8°C in July. Mean minimum temperatures are 20.5°C in January and 5.2°C in July. Temperature extremes range from below freezing on winter nights to above 45°C on summer days. Mean annual rainfall is 234 mm and although the mean monthly rainfall is relatively consistent, high rainfall events can occur between January and May due to remnant cyclonic activity. These events are relatively rare and have little effect on the mine operations. The most reliable rains occur in winter from cold fronts arriving from the west, and cloud bands from the northwest. January and February are the wettest months with an average of above 40 mm. Evaporation rates are high and there are no naturally occurring perennial lakes, streams or rivers in the region. No extreme climate conditions are experienced that materially affect operations. 4.4 Infrastructure Gruyere is an open pit gold mining operation with associated infrastructure and facilities that operate year-round. Major infrastructure owned and operated by the Gruyere Joint Venture include an 8.2 Mt/a CIL process plant, a large waste dump, a tailings storage facility (TSF), haul roads, an airstrip, workshops, administration centres and a residential village (Figure 4.4.1). On-site power is provided by a 45 MW gas-fired power station supplied by a 198 km gas pipeline extending from the Eastern Goldfields Gas Pipeline (EGP). The APA Group (APA) designed, built and own the pipeline and power station that was fully commissioned in Q4 2018. The Gruyere residential village consists of a 648 room camp, offices, messing and recreational facilities. The Property is serviced by a sealed airstrip adjacent to the Gruyere village. The 2.1 km airstrip has achieved Civil Aviation Safety Authority (CASA) compliance and is approved for 100 seat jet aircraft. The Anne Beadell borefield, 23 km southeast of the mine site, provides most of the water required by the village. Potable water is processed via a reverse osmosis (RO) plant and disinfected using ultra-violet light filtration systems. The Yeo borefield, approximately 28 km west of the mine site, is the main source of water for the process plant. Water is also recycled from the TSF and fed back into the process plant.
P a g e 2 3 | 1 3 8 Figure 4.4.1: Gruyere operating sites and infrastructure Source: Gruyere CPR, 2021
P a g e 2 4 | 1 3 8 The process plant, located to the southeast of the open pit, consists of a gyratory crusher, SAG mill, ball mill and conventional CIL gold recovery circuit. Gruyere has a single purpose-built engineered TSF immediately east of the Gruyere open pit. It is an integrated waste landform in that it is a TSF built within a waste dump. Gruyere also has heavy mining equipment (HME) fleet maintenance workshops used by the mining contractor and fuel storage facilities, as well as supporting offices and stores. Other infrastructure at Gruyere includes: Warehouse and reagent storage areas. Process maintenance and warehouse facilities. Process water storage pond. Stormwater management infrastructure (bunds and drains). Explosive’s magazine. Process laboratory. Medical treatment centre. Light vehicle wash down facility. Raw water tanks and reverse osmosis water treatment system. The majority of the Gruyere workforce are fly-in fly-out (FIFO) from Perth with a small number of employees residing in other regional centres including Geraldton and Kalgoorlie. Work rosters are predominantly based on 8 days on, 6 days off cycles; however, some contractors operate on longer rosters such as 2 weeks on, 1 week off. Supplies are delivered to site via road transport from either Kalgoorlie or Perth via the Goldfields Highway and Great Central Road. The closest community is Cosmo Newberry which is approximately 80 km northwest of the Property. The closest population centre is the town of Laverton, approximately 160 km to the southwest with a population of 871 as at 2016. Facilities at Laverton include an airstrip, accommodation, police station, hospital, general store, supermarket, post office, service station, school, library, aquatic centre and hotel. Further details regarding the infrastructure are provided in Section 15. 4.5 Book value The economic analysis disclosed in chapter 19 is in respect of attributable Mineral reserves only and excludes Mineral resources and lower grade material. The assumptions, parameters and cashflows are only intended to support the reserve declaration of the operation. Certain assumptions and estimates might differ from the long-term outlook or actual results of the operation, including the commodity prices used, which are materially different from current spot prices. Changes in these assumptions may result in significant changes to mine plans, models and the NPV of the operation. The Mineral reserves will therefore not necessarily represent the total future economic benefit that can be derived from the Property. Net Book value of property plant and equipment consists mainly out of land, mining infrastructure, mine development, mineral and surface rights and processing plant related assets of the Property. Gruyere 50 % has a book value of $587.5. The Qualified person is of the opinion that the book value estimated as described is expected to be different to the NPV for the attributable reserve only.
P a g e 2 5 | 1 3 8 5 History The general region surrounding Gruyere was prospected for gold in the late 19th century and explored for nickel, chromite, platinum group elements and gold by various exploration companies between the 1960s and 2000s. Metal Mining Australia discovered the Attila gold deposit on the Yamarna structure in the early 1990s. The project was sold to Zanex NL in 1994 who subsequently entered into a farm-in agreement with Asarco. A series of substantial exploration programs were carried out up to 2005 when Faulkner Resources consolidated the tenements in the belt and listed Eleckra Mines Ltd on the ASX in 2006. Following the discovery of the Central Bore deposit in 2009, Eleckra Mines changed its name to Gold Road Resources in 2010. Gold Road Resources discovered the Gruyere gold deposit in 2013. A total of 87,066 m was subsequently drilled in 470 holes as part of the feasibility study completed in 2016. The Gruyere Joint Venture with Gold Fields was formed in November 2016. Construction commenced in early 2017 following the receipt of the required regulatory approvals. In May 2019, Gruyere mine was successfully commissioned with the first gold achieved in June 2019. Commercial production was achieved at the end of September 2019., Gruyere achieved the first full year of commercial production in 2020 with 258,000 oz gold produced from 8.1 Mt of ore. The historic drilling and current drilling was amalgamated into a current database. The Qualified person is of the opinion that the historic drilling is of sufficient quality to be used in estimations. The Qualified person is of the opinion that the historic exploration results have been superseded and supplemented by more recent exploration undertaken by Gold Fields for areas of current interest and that any historic errors or deficiencies will have little influence on the current Mineral resource models or the life of mine reserves.
P a g e 2 6 | 1 3 8 6 Geological setting, mineralization, and deposit 6.1 Geological setting Gruyere is situated in the central part of the Dorothy Hills Greenstone Belt, which is a sub‐basin in the north-eastern portion of the Yamarna Greenstone Belt. The Yamarna and Dorothy Hills Greenstone Belts are the easternmost known greenstone belts of the Archean Yilgarn Craton, a 2.6 Ga granite-greenstone terrain in southern Western Australia (Figure 6.1.1). Figure 6.1.1: Gruyere – regional geology Source: Gruyere CPR 2021 These two greenstone belts form part of the Yamarna Terrane. The western margin of the terrane is marked by the 350 km long Yamarna Shear Zone, which is a broad, crustal scale, east-dipping listric shear zone separating the Yamarna Terrane from the older Burtville Terrane to the west. The eastern margin of the terrane is typically sheared against interpreted metagranitic rocks concealed under cover. The northwest trending Yamarna Greenstone Belt on the western margin of the Yamarna Terrane extends over a 250 km strike length, varying in width from 3 km to 30 km (Figure 6.1.2). Approximately 25 km to the east is the poorly exposed northwest-trending Dorothy Hills Greenstone Belt which extends over a 90 km strike length and varies in width from 3 km to 10 km.
P a g e 2 7 | 1 3 8 Figure 6.1.2: Local geology of the Gruyere area Source: Gruyere CPR 2021 In comparison to other greenstone belts in the Yilgarn Craton, the geology of the Yamarna Terrane, including the Yamarna and Dorothy Hills Greenstone Belts, remains poorly understood. The Archean basement rocks are dominantly covered by Quaternary aeolian sands generally 1 to 3 m thick with localised sand dunes up to 10 m in height or by localised thick accumulations of semi-consolidated Cenozoic sedimentary rocks.
P a g e 2 8 | 1 3 8 The Gruyere deposit is a large shear-hosted, Archean orogenic gold deposit located on a flexure point of the regional- scale Dorothy Hills Shear Zone within the Dorothy Hills Greenstone Belt, where the shear zone changes from a northerly to a north-northwest direction. The deposit is predominantly hosted within a steeply east-dipping, medium-grained quartz monzonite porphyry intrusion. The monzonite porphyry intrudes a sequence of mafic and intermediate volcanic and sedimentary rocks with a distinctive tholeiitic basalt unit in the hangingwall to the southeast. The monzonite porphyry averages 90 m in horizontal width through the deposit with a maximum width of 190 m in the centre tapering to between 5 m and 10 m width at the northern and southern extremities. The monzonite porphyry is sheared with a strong foliation fabric invoked by the Dorothy Hills Shear Zone, which dips steeply (65 ° - 80 °) to the east and strikes approximately 340 º. Kinematic indicators measured from drill core show both sinistral and dextral, and reverse and normal movement sense indicating a complex structural history. The gross‐scale movement on the Dorothy Hills Shear Zone appears to be dextral, with strong sinistral overprint evident in the Gruyere deposit area. Northwest-striking thrust faults, initially interpreted from magnetic data and observed in drill core, are believed to be important controls to the gold mineralisation. These faults are interpreted to be early features that offset the regional stratigraphy, but not the Dorothy Hills Shear Zone or the Gruyere monzonite porphyry. These appear to be coincident with zones of thickening of the monzonite porphyry and areas of higher grade development in the north. The gold deposits along the Yamarna Greenstone Belt in the west of the Property (Attila, Alaric, Montagne, Argos and Orleans deposits) are hosted along a steeply dipping sequence of sheared felsic to mafic volcanic and sedimentary rocks. 6.2 Mineralisation Gold mineralisation at the Gruyere gold deposit is developed in the monzonite porphyry in response to a complex structural event. The monzonite porphyry, which is more competent and brittle with respect to the more ductile host rocks, suffered increased cracking and fracturing compared to the adjacent rock types. This created increased permeability allowing gold bearing mineralising fluids to flow through the rock mass and deposit gold. Multiple quartz vein sets are mapped through the deposit. These fall into three broad orientations: consistent tabular quartz veins with a shallow dip to the southeast varying from 1 cm ‐ 100 cm in thickness; irregular quartz veins with a moderate dip to the northwest; and quartz‐carbonate shear veins parallel to the shear foliation. The entire Gruyere quartz monzonite is altered with the alteration intensity ranging from very weak to very strong intensity. Early-stage alteration comprises a brick‐red haematite‐magnetite assemblage associated with background (<0.3 g/t Au) gold mineralisation. Weak to strong gold mineralisation is increasingly associated with sericite, sericite‐ chlorite, chlorite‐muscovite, chlorite‐muscovite‐albite, and strong albite alteration. The mineralised strike is 2,200 m with a known vertical extent of over 1,100 m. Sulphides are commonly associated with the gold mineralisation, with pyrite dominant in the upper areas and pyrrhotite increasing with depth. Arsenopyrite is commonly associated with quartz veining in areas of highest grade gold mineralisation.
P a g e 2 9 | 1 3 8 Figure 6.2.1: Gruyere stratigraphic column Source: Gruyere CPR 2021 A persistent 1 m to 5 m wide steeply dipping mafic dyke (Main Dyke) is located proximal to the hangingwall zone. Multiple thin sub‐parallel, intensely sheared, predominantly mafic rocks occur internal to the monzonite porphyry and are interpreted to be rafts of the initial shear zone caught up in the monzonite porphyry during the intrusion of the unit and post mineralisation dykes. A representative section through the Gruyere deposit with the 2021 Mineral reserve open pit design is shown in Figure 6.2.2.
P a g e 3 0 | 1 3 8 Figure 6.2.2: Gruyere Geological Section – Looking North Source: Gruyere CPR 2021 The YAM14 deposit is located 8 km south of Gruyere (Figure 4.4.1) within a flexure of the Dorothy Hills Shear Zone. Host rocks to the gold mineralisation at YAM14 are dominated by a felsic volcanoclastic sedimentary package (felsic tuff) and a sequence of intercalated mafic and intermediate sediments. Primary mineralisation occurs sub-parallel to lithology and dips moderately to steeply (55 ⁰ - 75 ⁰) to the east. Elevated gold grades are associated with intense shearing, increased quartz veining, sulphide content (pyrite-pyrrhotite) and sericite-chlorite-albite alteration. Visible gold occurs within the quartz veining. Mineralisation transects the felsic tuff in the footwall to the south and the hangingwall to the north. Two major faults are interpreted from aeromagnetic and induced polarisation (IP) geophysical data; the Monocot to the south and the Breakaway in the north. The faults appear to define the strike extent of mineralisation; however, the area north of the Breakaway Fault has not been thoroughly tested. The weathering profile is of moderate thickness with the transition to fresh rock occurring at a depth of 50 m to 60 m. Gold mineralisation within Yamarna Greenstone Belt is associated with a northwest trending structural corridor termed the Attila – Alaric trend defined over a ~17 km strike length (Figure 4.4.1). Mineralisation at Attila is hosted in a sequence of mafic and felsic volcanic intrusives and sediments on the western margin of the Yamarna Greenstone Belt. The deposit is located on a flexure of the northwest striking Yamarna Shear Zone. The sequence strikes northwest, dips steeply to the east, is metamorphosed to amphibolite facies and is strongly foliated. Gold mineralisation is hosted in shear zones parallel to the stratigraphy characterised by laminated quartz-mica- amphibolite schists. Gold deposition has both a lithological and structural control. Mineralisation is associated with the presence of sulphides and quartz veining and within iron-rich mafic units. The trend of the main zone of mineralisation is steeply dipping (65 º - 75 º) to the east with either gently north-plunging or horizontal shoots developed.
P a g e 3 1 | 1 3 8 The Alaric deposit is located on a flexure of the northwest striking Yamarna Shear Zone, within a ~1.5 km wide zone of mylonitic mafic and felsic volcanics and sediments. Gold mineralisation at Alaric is typically located on or near to contacts of interpreted dolerites hosted within intermediate and dacitic volcanic sediments. The Main Shear is hosted within a dolerite with a characteristic chrome- rich base traced along the length of the deposit. Like Attila, the gold mineralisation is hosted within northwest striking, steeply east-dipping shear zones conformable to stratigraphy and characterised by laminated quartz-mica-amphibole units. The trend of the main mineralisation is interpreted to be steeply dipping (65⁰ ‐ 75⁰) to the east and associated with the presence of sulphides and quartz veining. Several cross‐cutting linear faults are interpreted from the magnetics and distribution of lithologies and appear to limit the strike extent of the mineralisation. The stratigraphy at Montagne is dominated by sheared intercalated mafic and intermediate sediments. Occasional mafic intrusives including biotite ± amphibole altered melanodolerites are common in the hangingwall above the main mineralised shear. Chloritic shale and tuff, which are two unique stratigraphic hangingwall marker units traceable over several kilometres of the Attila-Alaric trend, are both present at Montagne. Footwall lithologies are dominated by intercalated mafic and intermediate sediments with zones of elevated chromium and lamprophyre intrusives. The sequence is metamorphosed to upper greenschist – lower amphibolite facies. Gold mineralisation is hosted within north-striking (Attila local grid), steeply east-dipping shear zones characterised by laminated pyrite-biotite units ± thin quartz veins. High-grade mineralisation occurs as 2 m to 15 m wide zones proximal to the core of the shears associated with increased pyrite alteration. The thickness of transported cover at Montagne is minimal, comprising 2 m to 5 m of aeolian sand, with weathering typically ranging in depth from 25 m to 70 m. Gold mineralisation at Argos trends parallel to the local foliation in more mafic units within a sequence of mafic to intermediate volcanics and sediments. Multiple narrow (2 m -7 m), parallel zones of gold mineralisation are common and exhibit good continuity along strike and downdip. The mineralisation is associated with shearing and early amphibole-albite-biotite-sericite-quartz alteration. The principal sulphide is pyrite, with rare disseminated pyrrhotite and arsenopyrite also present. A later stage haematite- quartz alteration on either side of the main shear zone is interpreted to be associated with oxidised fluids introduced by late-stage, northeast trending faults which cut the Attila-Alaric trend stratigraphy. The regolith profile at Argos is stripped, with the recent cover sequence ranging from 1 m to 3 m thick in the north and 15 m to 20 m in the south of the deposit. Mineralisation at Orleans is hosted by intermediate sediments with gold associated with an increase in shearing and biotite-sulphide alteration. The footwall position of coarse intermediate sediments is higher up the stratigraphic profile than seen at Argos and Montagne. The Central Bore deposit is located 3 km east of the Orleans deposit. The geology at Central Bore consists of northwest trending, sub-vertical andesitic volcanics and porphyries (tuffs). Gold mineralisation is also sub-vertical, restricted to a single, narrow shear zone (1 m to 2 m wide) characterized by carbonate veinlets, alteration, and fine-grained sulphides (molybdenite in particular). Visible gold is common in these intersections, but it is generally fine grained. The auriferous shear zone is known to extend over an 800 m strike length, sub-cropping near surface on the northern extent and open at depth. There is a strong indication of both a steep sub-vertical plunge and a shallow southerly plunge to the mineralisation; however, further work remains to fully understand the structural orientation of the high-grade shoots within the mineralisation sheet. Weathering is poorly developed and shallow, with the top of saprock and the transition zone located approximately 10 m to 20 m below surface. Top of fresh rock is located approximately 40 m to 50 m below.
P a g e 3 2 | 1 3 8 7 Exploration 7.1 Exploration Exploration completed within the Gruyere Joint Venture mining lease was managed by Goldfields as part of its extensive Gruyere Deeps exploration program. Drilling lay within tenement M38/1279. Gruyere Joint Venture utilised AusDrill for both Phase 1 and Phase 2 diamond programs during 2021. Between both programs a total of 12,425 m were drilled, with a total expenditure of US$3.6 million. Phase 1 comprised of six angled (70 degrees dip) diamond drill holes, on 400 m spacing along strike of inferred Porphyry extents. Drilling tested for depth and strike extensions of the Gruyere Porphyry, approximately 400 m below the current Stage 5 pit design, with a total of 6,315 m drilled. Phase 1 also included Geotechnical logging/test-work of selected holes, and Metallurgical testing of 12 composites. Phase 2 included an additional seven diamond drill holes (6110 m total), designed to test the conceptual down dip extent of the northern high-grade zone, providing greater understanding of the continuity and potential extent of mineralisation within it. Phase 2 aimed to give greater confidence that the Gruyere Porphyry mineralisation could be viable for extraction via underground mining and future open pit cutbacks north of the mine. Seven drill holes were drilled from surface on 200 and 100 m northings along the existing strike extent of the Gruyere Porphyry. The final hole for Phase 2 was completed in December 2021. Visual observations confirmed zones of strong to intense Albite ± Sericite ± Biotite ± Chlorite + Sulphide alteration consistent with gold mineralisation within the Gruyere Porphyry. 7.2 Drilling 7.2.1 Type and extent Diamond core drilling was completed by Ausdrill diamond drill rigs during 2021. The holes were drilled with HQ barrel configuration then went down to NQII size for the rest of the holes. In total 13 holes were drilled from the surface for a total of 12,425 metres. A summary of the exploration drilling completed in 2021 is shown in Table 7.2.1. Table 7.2.1: Summary total Gruyere Joint Venture exploration drilling – 2021 Drill type Metres AC 0 RC 0 Core 12,425 Total 12,425 Source: Gruyere CPR, 2021 The Qualified person’s opinion is that a register of individual drill results would be too voluminous, potentially misleading and not relevant to the current reporting of Mineral resources and Mineral reserves. The Qualified person’s opinion of the 2021 exploration programs and results is: a) All procedures and parameters applied to the surveys and investigations are appropriate for the style of mineralization being prospected. b) The exploration programs have confirmed continuity of geology and controls on gold mineralization in key areas. c) There were no material variations encountered during the 2021 exploration programs. d) Based on the 2021 exploration and results a 2022 exploration budget has been approved to retain traction on the programs and to progress leading projects.
P a g e 3 3 | 1 3 8 7.2.2 Procedures All drilling is completed by third party contractors under formalised contracts with quality specifications and routine validation and monitoring by site staff. Spatial data At Gruyere, most mine scale maps and sections are produced in local grid (Gruyere Grid) which is oriented -20° from true north. This orientation is preferred because it is parallel to the general lithological strike and facilitates simplified map and section generation and drill planning. The Australian Height Datum (AHD) was adjusted +9,000 m to avoid negative values in potential underground operations. Most regional scale maps and sections (i.e. outside of the mine area) are reproduced utilising the Map Grid of Australia 1994 Zone 51 (MGA94-51) coordinates. Drill planning and design is typically completed either in Datamine 3D or Leapfrog software packages. Collar pickups Surface drill collars are initially marked out using a differential global positioning system (DGPS). Once drilled, all DD hole collar positions are surveyed by accredited surveyors using a Trimble R10 GPS to an accuracy is to within ± 20 mm. Downhole surveys All drill holes used for Mineral resource estimation have downhole surveys completed. Prior to August 2014, downhole surveys used an electronic single shot camera to take dip and azimith readings at 50 m intervals during drilling. This was reduced to 30 m intervals after August 2014. Post drilling, the holes are surveyed using a north seeking gyrosopic tool. Core orientation DD core is orientated using a Reflex surveying tool or similar tool to facilitate the collection of structural data. Orientation is completed by placing the drill core in a “V” rail so that the orientation marks line up flush against one of the rail edges and core ends matched up. Once two or more orientation marks are lined up, a hard line is drawn through these marks. Where there is a discrepancy but the core breaks line up, a dotted line is drawn along the core. Sampling Prior to logging the core is cleaned, laid out, accurately measured and photographed both dry and wet prior to sampling. Half core cut by a core saw or full core samples are collected depending on the purpose according to a cut sheet compiled by the geologist. Geological logging Data collected includes geological logging of all drill hole chips and core on a detailed basis. In most cases, routine data is collected including lithology, structure, stratigraphy, mineralisation, alteration, geophysical (magnetic susceptibility) and physical measurements (geotechnical RQD's and density). The core is logged at the Gruyere core yard. Standard logging conventions are used to capture information from the drill samples, with most observations stored electronically using Toughbooks. Numerous validation steps are built into the Datashed® logging software and all codes are selected from drop down lists. All captured data is loaded and validated into the Datashed® database. Magnetic susceptibility readings are taken every metre for exploration core. Core loss and rock quality designation (RQD) is recorded, and orientations of structures and contacts measured after the core is orientated. Recovery factors for diamond core are generally very high and typically close to 100 %. For RC holes, the collar samples and samples collected from transported sediments can be lower in recovery with the remaining samples generally returning 100 % recovery.
P a g e 3 4 | 1 3 8 In some cases, additional work is completed off site by technical experts and may include petrographic analyses, mineralogy and geochronology as part of ongoing research and development cooperative ventures. This data is included in standard reports and the database for future use. All acquired data is based on current detailed knowledge and intellectual models derived over many years of exploration at Gruyere. Ongoing peer reviews and corporate consultants and industry experts routinely visit site to review the practices, and guide and align the staff with new innovative methods, ideas and concepts to facilitate continued excellence in exploration and resource estimation. In addition, internal and external training of new and existing staff to appropriate methods and techniques, together with management oversight, ensures ongoing best practices are applied to all aspects of the operation. The Qualified person’s opinion of the 2021 exploration and resource extension drilling is: e) All drilling and exploration field activities are supervised to ensure health and safety and maintain appropriate technical standards. a) The drill hole surveys are adequate by type and length for the intended purpose. b) Utilizing orientated core significantly enhances recorded information to assist with 3-D modelling c) The drill hole database and subsequent modelling aligns to core recovery losses and should not cause material errors d) Post QA/QC screening and validation exploration results are incorporated into the estimation of Mineral resources; the categorization of Mineral resources is described in chapter 11. e) Validated exploration results are used in the 31 December 2021 Mineral resource estimation. f) Individual exploration drill hole information is not viewed as significant or material to the Mineral resource and Mineral reserve reporting at Gruyere and consequently exploration data is not presented. 7.2.3 Results The results at Gruyere indicate that the gold mineralisation is consistent with the material found within the current pit design. Gold mineralisation was widespread but heterogeneously distributed throughout the Gruyere porphyry. Mineralisation was strongly associated with the presence of quartz veins and chlorite-filled fractures, with gold grade correlating with the abundance of veins and fractures and the width of quartz veins. Poorly and unmineralised areas correlate with the absence of veining and fractures, and where biotite-foliation or red hematite-dusted albite zones were well preserved. The presence of sphalerite and galena within veins and abundant arsenopyrite in altered wall rock were common indicators of higher gold grades. Results from both phases of drilling helped to identify potential areas of interest for further study into underground mining or further open pit cutbacks at Gruyere. The Qualified person’s opinion of the 2021 exploration and resource extension drilling is: a) All exploration activities, including drilling, database management, validation and QA/QC, prior to incorporating relevant data into the resource modelling and estimation process, is viewed as sufficient, appropriate, technically assured and suitable to support Mineral resource estimates.
P a g e 3 5 | 1 3 8 Figure 7.2.1: Gruyere Exploration Drilling Phases Source: Gruyere CPR 2021 7.3 Hydrogeology Hydrological and hydrogeological studies were completed for Gruyere as part of the 2016 feasibility study. The study was prepared by an external independent group (Pennington Scott 2016; 2088: Rev 0). Study parameters were derived from desktop and field observations (including feedback from DD drilling and geological and geotechnical logging). The key outcomes of the study were: The major water inflow to the open pit is likely to be at the base of the weathered zone. The rate of dewatering abstraction is anticipated to peak at approximately 30 L/s in the initial years of mining, declining to 20 L/s towards the end of the mine life. Fresh rock is likely to have a much lower water storage capability, hence resulting inflows will be low. Dewatering is planned to be achieved by ex-pit bores, in-pit sumps and horizontal seep wells. Flow rates into pit sumps from groundwater are estimated in the range of 9 L/s to 22 L/s. No major issues were identified which could impact on mining. The DWER advised that the hydrogeological studies supported the required amount of water to be abstracted with acceptable impacts on the groundwater resource and other users. Issuing of the water licence required an environmental assessment for impact on stygofauna, groundwater drawdown and water quality. A further Mine Water review was completed by Pando (Australia) Pty Ltd for the Pit Expansion Pre-Feasibility Study.
P a g e 3 6 | 1 3 8 7.3.1 Dewatering Gruyere Open Pit is located in a low rainfall zone, generally less than 500 mm annually, with occasional high intensity summer storms. The majority of these events runoff into the low gradient terrain and are discharged largely through evapotranspiration and lessor volumes to recharge to the underlying groundwater systems. The mine is dewatered using two pit sumps that are opportunistically located from bench to bench. Horizontal (+5 °) drain holes are installed to approximate depths of 30 metres within the exposed oxide and basement profiles at approximate 20 metre centres. Three vertical dewatering bores are located at the northwest corner of the Stage 1 crest. These bores extend into the top of the transition zone. Error! Reference source not found. shows the current operating and historical bore and monitoring infrastructure. These bores are regularly monitored for groundwater level and groundwater quality by dewatering and external consultant PANDO, to determine the localised and regional impacts of the mine dewatering activities. The water control measures established to date comprise: Dewatering bores; and Sumps and pumping stations. Vibrating Wire Piezometers The Qualified persons opinion of the 2021 hydrology is: a) Gruyere has reliance on appropriate hydrological studies conducted at all relevant sites b) Hydrology is not viewed as presenting a material risk to Gruyere or the December 2021 Mineral resource and Mineral reserve estimates. 7.4 Geotechnical Dedicated geotechnical data is collected for geotechnical design purposes. This may vary from rock mass logging and oriented logging of diamond core, and mapping of exposed surfaces once excavation starts. Acoustic televiewer geophysical probe is sometimes considered as an alternative to the manual logging. These geotechnical holes are planned along the pit periphery to intercept major and discrete structures that could have detrimental effects on slope stability. Representative samples are also collected and sent to the laboratory for testing. Ongoing data collection on selected exploration holes is carried out to increase data density. 7.4.1 Laboratory testing A representative number of all (uncut) resource diamond drilling are geotechnically logged and sampled for laboratory testing preferably HQ core size. In addition, targeted, dedicated triple-tube geotechnical holes are required for any study and are planned by the responsible geotechnical department. Gruyere guidelines for open pit studies are a minimum of one drillhole per 100 m of pit crest, or one drillhole pierce point per 4 ha of pit slope surface. Entire recovered orientated core is logged to determine representative rockmass. The required number of representative samples for lab testing are shown in Table 7.4.1. Table 7.4.1: Required number representative samples for laboratory testing Type of Test Samples Open Pit Direct Shear (for weathered rock, saprolite, fault gouge, etc.) 5 per domain Uniaxial Compressive Strength (UCS) (with Youngs Modulus and Poisson’s ratio determination) 5 per lithology Triaxial Compressive Tests (5 suites at four confining pressures) 20 per lithology Brazilian Tensile Strength 5 per lithology Acoustic Emission (AE) 3 per site
P a g e 3 7 | 1 3 8 Notes: a) Gruyere have completed this testing for the Life of mine reserve b) Domains and lithologies are based on core logging c) Additional sample testing is requested if required Source: Gruyere CPR, 2021 Where insufficient core logging data is available, line or cell mapping is conducted on surface or underground exposures The Qualified person’s opinion of the 2021 geotechnical work is: a) Gruyere has completed all appropriate testing for the current life of mine reserve and continues to test all new significant discoveries b) Geotechnical domains and lithologies are based on core logging and modelled by the Geology department c) Sample testing is adequate for the purposes of this report d) The quality of the sampling and laboratory testing is adequate to support the Mineral resource and Mineral reserve estimates. All material testings are performed in accordance with International Society for Rock Mechanics, ISRM, (1978) standards. A summary of material testing parameters for Gruyere can be seen in Table 7.4.2 and Table 7.4.3 below: Table 7.4.2: Summary of laboratory test results – I Rock unit UCS (MPa) Dry density (t/m³) Youngs Modulus (Gpa) Poissons Ratio Brazillian Tensile Strength (Mpa) S-wave Velocity (m/s) P-wave Velocity (m/s) Oxide 10 2.06 - - - - - Transitional 27 2.54 51 0.15 5.0 2,763 5,141 Tonalite 163 2.69 85 0.23 18.8 3,231 5,969 Basalt 79 2.87 78 0.30 18.5 3,217 6,306 Fault 3 2.56 1 0.37 0.5 - - Intermediate Volcaniclastic 75 2.75 62 0.23 13.7 3,143 6,075 Source: Gruyere CPR, 2021 Table 7.4.3: Summary of laboratory test results – II Rock unit Triaxel Compression Direct Shear Cohesion (kpa) Direct Shear- Friction Angle (°) Cohesion (Mpa) Single Shear Failure Friction Angle (°) Single Shear Failure Cohesion (Mpa) Multiple Shear Failure Friction Angle (°) Multiple Shear Failure Transitional - - - - 25 35.5 Basalt 7.01 28.1 21.8 43.2 46 39.0 Intermediate Volcaniclastic 21.42 32.2 15.0 46.2 37 33 Source: Gruyere CPR, 2021 The Qualified person’s opinion of the density work is: a) The bulk density testing is adequate for the intended purpose and the tonnage estimation based on the bulk densities appear to have little bias b) Bulk densities are consistent with lithology and ore types estimated over a ±25-year mining history An independent external party (Dempers and Seymour 2016) was commissioned to undertake the slope design analysis for the Gruyere open pit as part of the 2016 feasibility study. The scope of work for the analysis included DD drilling,
P a g e 3 8 | 1 3 8 geotechnical and structural logging of drill core, laboratory test-work of selected drill core samples, structural modelling of significant geotechnical features, 3D rock mass modelling utilising the Mining Rock Mass Rating system, kinematic structural analysis, probabilistic and deterministic structural analyses, and probabilistic and deterministic limit equilibrium analyses. The analysis considered data from 34 representative geotechnical drill holes, optical and televiewer surveys completed on 139 drill holes and core photos from 111 drill holes. Further analysis and a geotechnical report (Gruyere Open Pit Wall Optimisation Study) was completed in 2021 for the Gruyere Pit Expansion Pre-Feasibility Study. The geotechnical information collected in 2019 and 2020 from additional field programmes including diamond drilling with 15 dedicated geotechnical boreholes, logging of orientated core, geotechnical mapping, and ground water measurement, enabled a comparison to occur on the previously collected dataset. 7.4.2 Regional stability The regional stability of the mine was reviewed using numerical modelling software. The geotechnical environment at Gruyere is defined by seven main rock units, namely; oxide, transition, intermediate volcanic, tonalite, basalt, intermediate volcaniclastic and an interpreted fault zone. A 3D Mining Rock Mass Model (MRMM) was developed based on geological and lithological models and geotechnical logging of drill core. Detailed pit slope analysis of the MRMM resulted in the definition of 6 geotechnical domains and their respective batter and berm configuration. Pit slope berm and batter configurations were designed within the guidelines published by the DMIRS. Overall pit slopes are designed to achieve a minimum Factor of Safety of 1.2. The rock mass at Gruyere is classified as Fair to Good. Results from the feasibility study analysis indicate that geotechnical conditions at Gruyere are expected to be consistent with general conditions in the Eastern Goldfields of Western Australia. Table 7.4.4: Slope design configuration against geotechnical domains Design Sector Domain Northing Material Type Slope Height From (mRL) To (mRL) Number of Breach Batter Angle (º) Bench Height (m) Berm Width (m) IRA (º) Comment Northeast A 30300N – 51100N Oxide 60 9410 9350 6 45 10 5 34 Include 8 m wide berm on 9320 rl Transition 30 9350 9320 3 55 10 5 40 Fresh 200 9320 9300 1 60 20 6 49 Include 14 m wide geotechnical berm every 100 m vertical where there is no ramp 9300 9280 1 70 20 7 55 9280 9180 5 80 20 8 60 Stage 6: 8º batter angle applicable to last 2 benches only 9180 9120 3 85 20 10 60 East B1 50300N – 49950N Oxide 30 9410 9380 3 45 10 5 34 Transition 10 9380 9370 1 55 10 5 40 Fresh 310 9370 9350 2 60 10 6 40 Include 14 m wide geotechnical berm every 100 m vertical where there is no ramp 9350 9300 5 70 10 7 43 9300 9280 1 70 20 7 54 9280 9260 1 75 20 7 58 Stage 6: 85º batter angle applicable to last 3 benches only 9260 9100 8 80 20 8 60 9100 9050 2 85 20 10 60 Southeast B2 49950N – 49280N Oxide 30 9410 9380 3 45 10 5 34 Transition 20 9380 9360 2 55 10 5 40 Fresh 300 9360 9350 1 65 10 5 46 Include 14 m wide geotechnical berm every 100 m vertical where there is no ramp 9350 9340 1 70 10 6 46 9340 9320 1 75 20 7 58 Stage 6: 85º batter angle applicable to last 4 benches only 9320 9060 13 80 20 8 60 Southwest C1 49600N – 49280N Oxide 40 9410 9370 4 45 10 5 34 Transition 30 9370 9350 2 55 10 5 40 Fresh 80 9350 9340 1 60 10 5 43 9340 9320 1 75 20 8 56
P a g e 3 9 | 1 3 8 Design Sector Domain Northing Material Type Slope Height From (mRL) To (mRL) Number of Breach Batter Angle (º) Bench Height (m) Berm Width (m) IRA (º) Comment 9320 9260 3 80 20 8 60 Stage 6: 85º batter angle applicable to last 2 benches only West C2 50500N – 49600N Oxide 50 9410 9360 5 45 10 5 34 Include 10 m wide berm on 9320 rl Transition 40 9360 9320 4 55 10 5 40 Fresh 260 9320 9310 1 65 10 5 46 Include 14 m wide geotechnical berm every 100 m vertical where there is no ramp 9310 9300 1 70 10 6 46 9300 9100 10 80 20 8 60 Stage 6: 85º batter angle applicable to last 2 benches only 9100 9060 2 85 20 10 60 Northwest D 50500N – 51100N Oxide 60 9410 9350 6 45 10 5 34 Include 10 m wide berm on 9320 rl Transition 30 9350 9320 3 55 10 5 40 Fresh 200 9320 9310 1 65 10 6 43 9310 9300 1 70 10 7 43 9300 9280 1 75 20 8 56 Stage 6: 85º batter angle applicable to last 2 benches only 9280 9120 8 80 20 8 60 Source: Gruyere CPR, 2021 7.4.3 Infrastructure Long term infrastructure including waste rock landforms, the run-of-mine (RoM) pad and TSF are designed to be located outside the zone of potential geotechnical wall failure. This zone of potential failure is determined by applying the DMIRS guidelines. 7.5 Density Regular and systematic specific gravity measurements are taken on exploration diamond core according to a formal protocol. Hand specimens are collected in operating mining areas to confirm values. On new projects, where no data is available, known densities from similar deposits are used until data is available. Measurements are routinely taken to determine appropriate densities for tonnage calculations as part of normal exploration activities. This data is stored in the database. Specific gravity measurements for bulk samples are routinely completed by competent site staff for grab samples utilising the immersion methodology (weight in/out of water). Densities are generally consistent within lithology and ore types that have been determined. Table 7.5.1: Density by rock type Assigned Density Weathering Description Lithology Description MROCK GROCK Density Recent cover Quaternary cover 10 10 1.45 Permian cover 15 15 1.7 Upper and lower saprolite Mafic dyke 20 55 1.85 Saprock 30 55 2.35 Transitional rock 40 55 2.6 Fresh rock 50 55 2.95 Upper and lower saprolite External Tholeiitic basalt 20 50 1.85 Saprock 30 50 2.35 Transitional rock 40 50 2.6 Fresh rock 50 50 2.95 Upper and lower saprolite Volcaniclastic sediments 20 60 1.85 Saprock 30 60 2.35 Transitional rock 40 60 2.6
P a g e 4 0 | 1 3 8 Fresh rock 50 60 2.75 Upper and lower saprolite Gruyere Monzonite Porphyry 20 70 1.85 Saprock 30 70 2.45 Transitional rock 40 70 2.5 Fresh rock 50 70 2.65 Upper and lower saprolite SW Porphyry (Felsic Intrusive) 20 70 1.85 Saprock 30 70 2.45 Transitional rock 40 70 2.5 Fresh rock 50 70 2.65 Source: Gruyere CPR, 2021
P a g e 4 1 | 1 3 8 8 Sample preparation, analyses, and security 8.1 Sample collection Sample collection is based on the following sample types: Diamond core drilling DD: drill core sampling is carried out at the site core farm on selected intervals identified by the logging geologist. Sampling is marked up with a core length of between 0.2 m and 1.0 m, depending on the core size. Some core is whole sampled (full collection) when necessary. Generally, core is cut in half by an automated cutting saw with one half submitted for analysis and the other half stored in the site core farm for reference. Samples are bagged in pre-numbered calico bags and submitted to the laboratory with a sample submission form. Reverse circulation RC: the 1 m sample split is collected in calico bags at the drill rig through the cyclone/splitter set up attached to the drill rig. The goal sample weight for submission to the laboratory is around 3 kg. If compositing is performed, 4 m composites are created via spearing the 1 m reject samples collected in plastic bags. If composite samples return anomalous gold values, the 1 m samples produced from the riffle splitter are collected. Aircore AC: the sample is collected in a bucket / bag through a cyclone and placed in ordered piles. Samples are scooped from the 1 m sample piles and composited to 4 m to produce a bulk 2 – 3 kg sample. In wet horizons the total sample is collected and manually sub sampled utilising the fractional scooping technique. RC and AC samples are taken during drilling by the rig offsider and collected by field technicians. For every hole drilled, a unique hole identification number is allocated which can only be uploaded into the database with the appropriate associated metadata (e.g. spatial location, hole type, depth etc). Each sample collected is also issued with a unique sample number along with a depth interval. The recoveries and collection dates are recorded against each of these samples. All DD core is retained in the site core farm for future reference. RC and AC chips are stored in labelled compartment trays for future reference. Primary assay pulps are returned to site and stored in labelled individual paper envelopes within labelled cardboard boxes. Samples are stored by the assay laboratory according to the following schedule: The primary pulp used for assaying is held for up to three months then returned to Gruyere. The pulp residue is retained for three months then discarded. Bulk residues are retained for three months then discarded. All other samples are retained for one month then discarded. Samples are dispatched to the laboratory via local transport companies from the Yamarna exploration compound for further preparation and assaying. Although security is not strongly enforced, Gruyere is a remote site and the number of outside visitors is small. The deposit is known to contain visible gold and this renders the core susceptible to theft; however, the risk of sample tampering is considered low. There is a security gate installed and the general public does not have access to the mine site. 8.2 Sample preparation Preparation of the drill samples is currently undertaken by ALS (Perth). ALS are NATA accredited under ISO/IEC 17025. Accreditation date is 11th October 2019 which valid for three years All laboratories (primary and umpire) processing Gruyere samples are required to have separate preparation and analysis circuits for mine grade control and exploration samples (those with potential low-level gold) to minimise cross contamination. Samples are marked up with a maximum core length of 1 m, depending on the core size.
P a g e 4 2 | 1 3 8 The samples are sorted on arrival at the laboratory and physically checked against the accompanying documentation, weighed and the sample numbers entered into the LIMS (Laboratory Information Management System). Bar-coded sample labels and work sheets are used to control the workflow through the sample preparation and analytical phases. Samples are dealt with sequentially as per Gruyere instructions. Gruyere is notified of any discrepancies prior to sample preparation commencing. No Gruyere personnel are involved in the preparation or analysis process. Samples within their calico bags are placed in a modern forced air oven and dried at 105 ºC. Where needed (e.g. diamond core), the dry samples are crushed to 85 % passing 10 mm in a jaw crusher followed by further crushing in a Boyd crusher to 85 % passing 3 mm. The Boyd crusher rotary splitter is set to provide a 3 kg split which is pulverised in a LM5 pulveriser. If the crushed sample is less than 1.2 kg, the sample is milled in a C1000 bowl. A scoop of pulverised sample (~200 g) is placed in a labelled paper sample bag for analysis. Details of the sample preparation process is shown in Figure 8.3.1 for RC and AC samples and Figure 8.3.2 for diamond core samples. The Qualified person has reviewed the sample preparation and security procedures. The sample preparation is found to be adequate with effective supervision and in line with industry leading standards. No material bias is indicated that could potentially impact the sampling preparation and analysis. Sample security enforcement is reliable with low consequence if in the unlikely event of security protocols failure. The Qualified person has reviewed the certificates and is of the opinion that the analytical laboratories are certificated and have effective process and protocol in place to ensure quality control and assurance and minimize any material errors. 8.3 Sample analysis Gruyere currently assays for gold using 50 g Fire Assay (FA50) with an inductively coupled plasma optical emission spectrometry (ICP – OES) finish to a 0.01 g/t Au detection limit. Both fire assay with an atomic absorption spectroscopy (AAS) or ICP - OES finish were used in the past. Given the occurrence of some high grades, Screen Fire Assays (SFA) checks are undertaken (<1 % of the total samples).
P a g e 4 3 | 1 3 8 Figure 8.3.1: Sample preparation workflow for RC and AC samples Gruyere AC/RC Primary Sample Preparation and Assaying Flowchart Source: Gruyere CPR, 2021
P a g e 4 4 | 1 3 8 Figure 8.3.2: Sample preparation workflow for diamond core samples Gruyere Core Primary Sample Preparation and Assaying Flowchart Source: Gruyere CPR, 2021
P a g e 4 5 | 1 3 8 8.4 Quality control and quality assurance (QA/QC) ALS routinely run a blank and two standards with each batch. These results and the long-term results are available at any time on request. Periodic QA/QC reports looks at the entire assay data received and produces reports in the accuracy, precision and overall quality of the data. QC samples are routinely inserted within batches allowing monitoring of the drilling, sampling, laboratory sample preparation techniques as well as analytical accuracy and precision. A summary of the different types of QC samples are described in Table 8.4.1. Table 8.4.1: Quality control sample type summary Sample description QC stage Comments Field duplicate Monitors sample source and sampling procedure Duplicate sample taken identically as the original sample (half core; reverse circulation duplicate split taken in field) Laboratory duplicate Preparation Repeats taken by ALS to monitor the laboratory process Coarse crush duplicate Preparation after jaw crush, but before pulverized Implemented in 2019 to ensure that whole diamond core samples can get a representative duplicate Standard/blank Analytical Certified sample of known concentration: pulps (standards), coarse crushed matrix-matched basalt (blank) Pulp re-assay Analytical Repeated re-assay on the analytical pulp as requested by the QA/QC geologist from a QC failure or as a lab check Pulp umpire Analytical (at the end of a program) Random subset of pulps sent to an umpire laboratory to ensure analytical accuracy and precision Source: Gruyere CPR, 2021 Certified reference materials (CRM), blanks and duplicate samples are inserted completed by geologists or geology assistants within batches of samples to ensure ongoing sample quality control. Low-grade, medium-grade and high- grade standard samples are inserted at relevant locations within intersections at a minimum frequency of 3 in 100. Blanks are inserted at an average frequency of 3 in 100 samples. Duplicates are collected at an average frequency of 1 in 40 samples. All sampling and quality management is supervised by the geologist responsible for the drilling program. The geologist may supplement the QA/QC sampling as required. All standards used are CRMs that have been subject to ‘round robin’ analysis. Gruyere uses a custom-made standard prepared from mineralised Gruyere samples. Quartz washes (barren material) are also inserted between extremely high-grade areas to monitor any carry over from the sample preparation stage in the laboratory. On receipt, the laboratory batch is analysed to determine accuracy, precision and repeatability of each assay. All assay results are received directly from the laboratory in a digital format and loaded into the database. The results are subjected to an automated process where the QA/QC samples are evaluated and either pass or fail. Assay results outside a standard set of control guidelines are flagged and a warning notification is sent to the responsible geologist. If a batch fails, it is quarantined in the database until the geologist concerned has examined the data and determined the required course of action in conjunction with the database geologist. Results are collated and reported for each drilling program. Data analysed includes sample size (weight), and standard, duplicate and blank performance. All QA/QC data is stored in the database along with the original data and follow-up actions. No systematic long term sample biases have been identified from the QA/QC programs. The QA program for the drilling carried out at Gruyere demonstrates sufficient accuracy and precision for use in estimating the Mineral resource. Gruyere conducts annual laboratory audits in keeping with industry practices. The 2021 audits were carried out by Gold Field’s personnel and did not identify any major issues (Table 8.4.2). Auditing covered the complete process flow from sample receipt to final assay sign-off. In addition, Gold Field’s corporate team members conduct periodic audits of all laboratories.
P a g e 4 6 | 1 3 8 Table 8.4.2: Laboratory audits 2021 Date Auditor Laboratory Findings 09/02/2021 L Smuts ALS Perth New Orbis fine crushers need cleaning. Low sample volumes. Big focus on staff training, maintenance, fixings, housekeeping undertaken. 24/02/2021 L Smuts ALS Kalgoorlie Cleaning practices have been improved. 09/06/2021 L Smuts ALS Kalgoorlie LM5 cleaning practices reviewed, new staff retrained, improved cleaning practices of bowl. Low sample volumes 25/05/2021 L Smuts ALS Perth Single use vessels need to be re-usable. 15/09/2021 L Smuts ALS Perth LM5 operator observed not cleaning sufficiently between samples. Robotic pulp cell decommissioned and off site. Fire assay expansion ongoing. 24/11/2021 L.Smuts ALS Kalgoorlie Orbis internal cleaning needs to improve. Very large volumes of samples seen during the month. Dust extraction upgrade completed. 03/12/2021 L Smuts ALS Perth Volume dispensing adjustments were applied. Full internal review of all practices commenced Source: Gruyere CPR, 2021 All geologists receive training in QA/QC and the use of acQuire® to evaluate the analytical data and are expected to actively monitor and maintain the quality of the data they are producing. Gruyere provides the geologist with the minimum frequency of QC samples to be inserted into their sampling programs. QC data is monitored continuously by senior geologists and by the program geologist during drilling.
P a g e 4 7 | 1 3 8 9 Data verification The Gruyere exploration programs, and Mineral resource and reserve estimates are completed to industry best practice and aligned with numerous standards and procedures developed by Gold Road Resources and Gold Fields over many years. The process consists of procedures, audits and sign-off documents for all key elements that input into the generation of the resource model to ensure full compliance. The key components of the geological data acquisition framework include: Validity – Controls to ensure the validity of key activities. Accuracy – Controls to establish the accuracy of data inputs and outputs. Completeness – Controls to ensure the completeness of the process followed. Timing – Preventative and detective controls to identify potential risk and deviation of quality. Segregation of Duties/Sign-off – Key members of the senior team are responsible for different aspects of the process. The Qualified person's opinion on the adequacy of the data for the purposes used in the technical report summary The Qualified person is of the opinion that the data verification process and protocols are adequate to minimize any material errors, are in line with industry leading standards and underpin technical assurance. 9.1 Data management All data at Gruyere is stored in an SQL relational database format using a proprietary front-end software interface (acQuire®). acQuire® enables definition of tasks, permission management and database integrity. The SQL server database is configured for optimal validation through constraints, library tables, triggers and stored procedures. Data that fails these rules on import is rejected or stored in buffer tables until it is inspected, validated and corrected. Security and disaster recovery protocols are in place and follow corporate guidelines under the direction of the IT Department. Gold Fields conducts daily server backups of its databases. All exploration data control is managed centrally, from drill hole planning to final assay, survey and geological capture. Most logging data (lithology, alteration and structural characteristics of core and chips) is captured directly either by manual or to customised digital logging tools with stringent validation and data entry constraints. Geologists load data via buffer tables where initial validation of the data occurs. The data are uploaded into the database by the geologist after which an additional automated validation process is conducted on the data and the geologist is notified of issues. The issues must be addressed before the data is loaded into the database. All assay data is automatically uploaded into the database from text formatted files (.CSV). These files include detailed information about the batch, methods, units, detection limits and elements assayed. The file also includes all QC data in the sequence of analysis. The assay data is stored in a normalised format to ensure all required information is captured for each sample and that multiple assay results are stored for each sample. Data validation is controlled via rules, library tables, triggers and stored procedures. Once all the data for a drill hole is entered into the database, the geologist responsible for the drilling program validates each drill hole. Data validation includes checks for; incorrect collar locations and overlapping, missing or incorrect downhole surveys. Procedures and templates are available for all geological data. Additional drill hole validation is completed using Datamine® or Leapfrog® software. This validation checks for unique collar locations, overlapping intervals, excessive downhole deviation and matching total drill depth within all tables. Errors are reviewed and either corrected or the hole is flagged and excluded from use in Mineral resource estimation. All issues identified are corrected in the acQuire® database. Confirmation is required that all data imported into the database was validated by the database administrator and the geologists. Confirmation is also required that validation of all data occurred prior to it being imported into the final database tables. Only results accepted by the database administrator or senior geologists are used in Mineral resource
P a g e 4 8 | 1 3 8 estimation. Any primary results that have failed the QA/QC standards are rejected, re-assayed and re-imported for the database administrator or senior geologists to approve. The digital certified assay certificates in Adobe PDF format are stored and backed up on the server on a regular basis. The Qualified person’s opinion of the data management is: a) The data management process and protocols are adequate to minimize any material errors. b) Regular validation of the database and data management process is aligned with standard industry practices, verified to GFA SOX measure quarterly as a minimum 9.2 Plant Sampling Daily composite samples of process plant feed and tailings streams are taken to assist with on-site gold accounting and reconciliation. These samples are collected using a combination of automatic sampling stations as well as manual cuts using appropriately designed samplers. The analysis of the samples used for accounting purposes is conducted by ALS at its Kalgoorlie laboratory. Solid sample composites are analyzed using fire assay with an AAS finish. Carbon sample composites are analyzed using high temperature ashing, acid digest and an AAS finish. Solution sample composites are analyzed using DIBK extraction and an AAS finish. All laboratory assaying procedures are aligned with standard industry practices. In accordance with Gold Fields Plant Metal Accounting Standard, a gold in circuit survey is undertaken monthly to reconcile (by mass balance) the back-calculated gold grade of the mill feed with the mill feed grade estimates obtained using plant samples and assays. The monthly variance between the assayed grade and the back-calculated grade is monitored, and an investigation is required to be carried out if this variance exceeds the minimum allowable levels outlined in the Gold Fields Plant Metal Accounting Standard. 9.3 Drilling Drillhole data validation is completed using Datamine® or Leapfrog® software. Validation checks completed in Datamine® software include the standard checks carried out when a drillhole file is generated; a survey file has been specified; each drillhole id has a survey reading for AT=0; each drillhole id in the (merged) sample file has at least one entry in the SURVEY file; the downhole TO value of a sample is greater than the downhole FROM value; the FROM/TO interval for one sample does not overlap the FROM/TO interval of the next sample; the FROM/TO interval is not duplicated; XCOLLAR, YCOLLAR and ZCOLLAR are not absent data. Checks are also carried out to compare the previous drillhole file used for estimation to the new drillhole file to ensure no missing data. Where multiple drilling techniques are used in a resource estimate (DD and RC), a comparison of the data within a common volume is carried out. If biases are noted, these are investigated to establish potential reasons and actions. A decision may be made to include or exclude the poorer quality data and to apply an appropriate resource classification. Where data is historic, a comparison of recent and historic drilling may be made, including a comparison of QAQC to assess data quality and suitability for use. Reconciliation data suggests the face samples may be more representative than the DD samples in Gruyere’s gold deposits. The Qualified person is of the opinion that the drilling protocols described in this report are adequate to minimize material errors and provide the necessary technical assurance. 9.4 Sampling Standard procedures exist for RC and diamond sampling and core cutting at Gruyere. Periodic routine visits to the drill rigs and the core farm are carried out by geology management to review core logging and sampling practices. These are also supported by quarterly routine walkthroughs and reviews.
P a g e 4 9 | 1 3 8 Core cutting sheets are generated in acQuire®, and once populated during the logging and sampling process, are re- imported. Some data, such as core logging and underground development face sampling, is entered or edited manually into the acQuire® database table forms or data entry objects. A unique sample dispatch is generated in acQuire® and emailed to the laboratory. Returned assays from the laboratory are linked to this dispatch and are emailed as a SIF file. These files include detailed information about the batch, methods, units, detection limits and elements assayed. The file also includes all QC data in the sequence of analysis. The Qualified person is of the opinion that the sampling protocols are adequate to minimize material errors and the analytical procedures reflect industry standard practice or better and are appropriate for resource estimation. 9.5 Survey Additional drill hole validation is completed using Datamine® or Leapfrog® software. This validation checks for unique collar locations, overlapping intervals, excessive down hole deviation, and matching total drill depth within all tables. Errors are reviewed and either corrected or flagged and excluded from use in the estimation. All issues identified are corrected in the acQuire® database. The Qualified person is of the opinion that the survey protocols are adequate to minimize material errors in sample location. 9.6 Sample analysis The GFA QAQC procedure is reviewed every two years. Assay certificate verification and assay laboratory audits are completed Done as per GFA SOX requirements minimum on a Quarterly review. The Qualified person is of the opinion that the sample analysis protocols are adequate to minimize material errors. 9.7 Geological modelling Geological interpretation has the potential to impact materially on the estimated quantity and quality of a Mineral resource and Mineral reserve. Incorrect assumptions regarding volume and geological and/or grade continuity has the potential to overestimate contained metal. However, support from expert geologists, site and corporate peer reviews, external reviews, and the Model Change Authorisation (MCA) process ensure that the geological interpretation is one that most geologists would independently arrive at. The Qualified person’s opinion of the geological modelling is: a) The geological modeling protocols are adequate to minimize material errors b) The controls have been reviewed and the adequacy is reasonable and that material bias or errors are unexpected c) The systems to reduce human and procedural errors, checks and balances are adequate and minimize material errors d) The protocols are adequate as reviewed and that the Mineral resource models are based on sound data and are reasonable.
P a g e 5 0 | 1 3 8 10 Mineral processing and metallurgical testing Test-work on the physical and liberation properties of the Gruyere orebody was completed in both the original pre- feasibility study and the 2016 feasibility study. The site process team performs ongoing reviews and reconciliation work to actively track and monitor metallurgical efficiency as part of standard operating practices. 10.1 Testing and procedures 10.1.1 Background The Gruyere operation currently comprises of one operating open pits mine. Existing Processing Facilities Following the formation of the Gold Fields and Gold Road Joint Venture, construction of the processing plant commenced in early 2017. In May 2019, the Gruyere primary crushing, SAG/Ball milling, CIL plant was successfully commissioned with the first gold achieved in June 2019. Commercial production was achieved at the end of September 2019. Gruyere achieved the first full year of commercial production in 2020 with 258,000 oz gold produced from 8.1 Mt of ore. Gruyere deposit The Gruyere deposit is the largest and most significant reserve and is current being mined as a large single open pit. Gold mineralisation is developed in the monzonite porphyry, with multiple quartz vein sets occurring throughout. Weak to strong gold mineralisation is increasingly associated with sericite, sericite‐chlorite, chlorite‐muscovite, chlorite‐muscovite‐albite, and strong albite alteration. Sulphides are commonly associated with the gold mineralisation, with pyrite dominant in the upper areas and pyrrhotite increasing with depth. Arsenopyrite is commonly associated with quartz veining in areas of highest-grade gold mineralisation. Golden Highway The Golden Highway consists of a series of relatively smaller satellite pits, that are planned to be mined later in the reserve life of mine plan. Currently no operational activities have yet occurred for these pits, which are summarised below. Atilla deposit Mineralisation at Attila is hosted in a sequence of mafic and felsic volcanic intrusives and sediments on the western margin of the Yamarna Greenstone Belt. Gold mineralisation is hosted in shear zones parallel to the stratigraphy characterised by laminated quartz-mica-amphibolite schists. Gold deposition has both a lithological and structural control. Mineralisation is associated with the presence of sulphides and quartz veining and within iron-rich mafic units. Alaric deposit Gold mineralisation at Alaric is typically located on or near to contacts of interpreted dolerites hosted within intermediate and dacitic volcanic sediments. The Main Shear is hosted within a dolerite. Like Attila, the gold mineralisation is hosted within northwest striking, steeply east-dipping shear zones, and associated with the presence of sulphides and quartz veining. Montagne deposit The stratigraphy at Montagne is dominated by sheared intercalated mafic and intermediate sediments. The sequence is metamorphosed to upper greenschist – lower amphibolite facies. Gold mineralisation is hosted within north-striking steeply east-dipping shear zones characterised by laminated pyrite-biotite units ± thin quartz veins. High-grade mineralisation occurs as 2 m to 15 m wide zones proximal to the core of the shears associated with increased pyrite alteration. Argos deposit
P a g e 5 1 | 1 3 8 Gold mineralisation is associated with shearing and early amphibole-albite-biotite-sericite-quartz alteration. The principal sulphide is pyrite, with rare disseminated pyrrhotite and arsenopyrite also present. A later stage haematite- quartz alteration on either side of the main shear zone is interpreted to be associated with oxidised fluids introduced by late-stage, northeast trending faults which cut the Attila-Alaric trend stratigraphy. 10.1.2 Metallurgical sampling & testing For the original pre-feasibility study (PFS) and feasibility study (FS), metallurgical test-work on the Gruyere deposit was carried out under the guidance and direction of Gold Road Resources, by ALS Metallurgy, Balcatta, Western Australia which is an accredited laboratory. Some initial metallurgical test-work was also arranged by Gold Road Resources for the potential smaller Atilla, Alaric and Montagne satellite deposits. Since commissioning of the processing plant additional metallurgical test-work was arranged by the new Gruyere JV, for the deeper ores at Gruyere as part of the pit expansion pre-feasibility study (2021); and further test-work arranged for Atilla, Alaric and Montagne (2020, 2021). All these subsequent test-work programs were also carried out by ALS Metallurgy in Perth. For the metallurgical test-work programs facilitated by the Gruyere JV, individual composite samples of diamond drill (DD) core are selected and collected by the relevant geologist. Samples are typically composited to obtain single continuous mineralised intercepts (including expected internal and external ore dilution) from a known single spatial location, representing individual mineralised zones. Due to the limited geological variability associated with the main Gruyere deposit, the only defined metallurgical domains are associated with geological weathering extent, being oxide, transitional and fresh. The samples, however, are spatially defined according to mining stage number, which is subject to on-going reassignment with any subsequent major changes to pit design and excavation sequencing. The Gruyere JV has adopted the same Gold Fields standard test-work protocol, which has been designed to reasonably reflect the performance of the existing gravity/CIL process plant and typically includes: Head analysis multi-elemental scans, including Au (gold), Ag (silver), Cu (copper), As (arsenic), C-suite (carbon), S- suite (sulphur), Hg (mercury), Sb (antimony), Te (tellurium) and quantified x-ray diffraction (QXRD) analyses. Acid mine drainage (AMD) analysis, being Total S, Acid Neutralisation Capacity (ANC), Net Acid Generation (NAG), Total Acid Production Potential (TAPP), Net Acid Production Potential (NAPP), Net Acid Generation (NAG), and pH. Comminution characteristics including crushing work index, abrasion index (Ai), Bond BWI and SMC SAG milling parameters. Gravity recovery estimation by laboratory Knelson recovery, followed by mercury amalgamation of concentrate. Leaching profile of combined gravity/amalgam tails, including leaching profiles of Au, Ag, Cu, pH, dissolved oxygen (DO), and free cyanide. Multi-elemental Inductively coupled plasma mass spectrometry (ICP-MS) scans of final leach solution. Leach solids residue analysis for Au, Ag and Cu. Diagnostic analysis of tailings residue if warranted. The test-work methodology used for the original Gruyere PFS and FS (under guidance from Gold Road) and the Golden Highway PFS, are slightly different to that being used currently by the Gruyere JV, with the main differences being: The gravity recovery test method with intensive cyanidation of the gravity concentrate (Gold Road), versus gravity concentrate treatment by mercury amalgamation and assaying amalgam to extinction (Gold Fields) The cyanidation tests are carried out at elevated free cyanide concentrations of 1,000 ppm (Gold Road), versus 400 ppm (Gold Fields) which is closer to the plant’s operating free cyanide concentration which is typically between 170 ppm to 200 ppm NaCN.
P a g e 5 2 | 1 3 8 10.2 Relevant results 10.2.1 Sample Head Analysis Gruyere open pit Table 10.2.1 shows a summary of the average Gruyere samples head analyses grouped by geological weathering and mining stage number. The Gruyere fresh ore samples are reasonably consistently enriched in sulphide sulphur (S sulphide), total carbon (C total), and calcium (Ca); and contain relatively low concentrations of organic carbon, (C organic) copper (Cu), lead (Pb), mercury (Hg), cadmium (Cd), tellurium (Te) and antimony (Sb). The oxide and transitional samples are relatively depleted in calcium (Ca), sulphide sulphur (S sulphide) and total carbon (C total). Table 10.2.1: Summary of Gruyere average sample head analyses Analyte Mining Stage Stage 2 Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6 Stage 7 Weathering Oxide Trans. Fresh Ag ppm 0.34 0.36 0.60 0.31 0.43 0.28 0.20 0.34 1.15 Al % 6.41 6.70 6.64 6.12 6.09 6.22 6.19 5.91 6.31 As ppm 303 200 100 333 128 235 200 109 252 Ba ppm 254 260 220 240 305 307 287 266 317 Be ppm < 20 < 20 <20 < 20 < 20 < 20 < 20 < 20 < 5 Bi ppm 14 15 25 < 25 15 < 25 < 25 15 < 10 C total % 0.08 0.05 0.48 0.48 0.42 0.42 0.40 0.44 0.42 C organic % 0.02 0.03 <0.03 0.02 0.02 <0.03 0.02 0.02 < 0.03 Ca % 0.36 0.38 1.34 1.49 1.35 1.45 1.37 1.56 1.52 Cd ppm < 20 < 20 <20 < 20 < 20 < 20 < 20 < 5 < 5 Co ppm < 20 < 20 <20 < 20 < 20 < 20 < 20 5.00 5.00 Cr ppm 77 73 125 30 34 18 <25 32 42 Cu ppm 25 25 15 19 23 25 23 22 25 Fe % 2.63 2.46 2.06 2.19 2.29 2.26 2.34 2.22 2.24 Hg ppm < 0.1 < 0.1 <0.1 < 0.1 0.07 0.05 0.07 0.05 0.05 K % 0.36 0.41 0.40 0.42 0.50 0.55 0.51 0.48 0.64 Li ppm < 20 < 20 <20 < 20 <20 <20 <20 10 10 Mg % 0.19 0.21 0.20 0.14 0.18 0.23 0.20 0.42 0.31 Mn ppm 251 356 440 429 372 360 358 376 317 Mo ppm < 20 < 20 <20 < 20 <20 <20 <20 8.21 4.58 Na % 4.11 4.60 3.94 4.40 4.29 4.02 4.06 3.85 4.33 Ni ppm 34 32 20 22 31 23 18 19 11 P ppm 321 400 250 419 450 300 227 343 267 Pb ppm 61 58 20 63 80 37 36 29 75 S total % 0.07 0.07 0.66 0.58 0.59 0.52 0.51 0.53 0.52 S sulphide % 0.05 0.04 0.52 0.49 0.49 0.43 0.38 0.35 0.41 Sb ppm 0.09 0.10 0.60 0.18 0.16 0.10 0.27 1.03 0.10 SiO2 % 68 73 68 72 74 74 73 74 71 Sr ppm 83 107 90 94 88 97 85 114 131 Te ppm 0.47 1.15 0.40 0.49 0.53 0.43 0.31 0.33 0.75 Ti ppm 1743 1600 1200 1424 1480 1453 1509 1429 1500 V ppm 41 32 10 7 11 9 10 13 12 Y ppm < 100 < 100 <100 < 100 <100 <100 <100 < 100 < 100 Zn ppm 56 94 100 71 95 86 80 87 65 Source: Gruyere CPR, 2021
P a g e 5 3 | 1 3 8 There are no significant differences in range of multi-elemental analyses results between the mining stages for the fresh ores at Gruyere, and therefore in this respect, the orebody appears relatively consistent with mining stage and depth. Golden Highway Table 10.2.2 shows a summary of the averages of the sample head assays for the Golden Highway deposits. Table 10.2.2: Summary of Golden Highway deposits samples average head analyses Analyte Mining Stage Alaric Argos Attila Montagne Weathering Trans. Fresh Oxide Trans. Fresh Oxide Trans. Fresh Oxide Trans. Fresh Ag ppm 0.60 3.60 1.76 3.94 4.52 1.20 1.20 1.63 3.00 2.00 6.89 Al % 7.48 8.32 8.16 8.44 8.08 8.39 7.68 8.24 22.96 19.48 19.84 As ppm 20 48 42 60 36 67 20 35 27 25 32 Ba ppm 500 504 754 704 825 493 560 531 889 533 726 Be ppm <20 < 20 <5 <5 <5 <20 <20 < 20 <5 <5 <5 Bi ppm <25 < 25 <10 <10 <10 <25 <25 < 25 <10 <10 <10 C total % <0.03 0.15 0.26 0.12 0.41 0.08 0.39 0.26 0.06 0.33 0.36 C organic % <0.03 0.05 0.10 0.08 0.08 0.07 0.03 0.03 0.03 <0.03 0.02 Ca % 5.10 3.62 1.95 2.42 3.33 1.00 5.40 3.66 2.20 4.10 3.74 Cd ppm <20 11.67 <5 3.00 <5 <20 <20 < 20 2.50 3.33 9.29 Co ppm 40 38 32 28 28 27 20 22 40 33 35 Cr ppm 200 94 111 114 60 29 125 71 137 103 130 Cu ppm 80 116 98 153 132 37 45 35 154 132 119 Fe % 7.36 7.69 5.90 5.91 6.21 5.49 5.42 5.06 6.38 6.73 6.63 Hg ppm <0.1 0.18 0.11 0.27 3.31 <0.1 0.80 0.06 0.23 0.10 0.40 K % 1.40 2.02 2.29 2.20 2.64 2.47 2.00 2.15 2.67 1.33 2.11 Li ppm <20 16 18 22 28 40 20 30 15 58 40 Mg % 3.88 2.48 1.36 1.49 1.30 1.99 3.00 1.97 1.97 2.43 2.78 Mn ppm 1600 1522 1309 1320 1490 1100 1200 1038 1371 1700 1786 Mo ppm <20 16.9 <5 4.0 <5 <20 <20 < 20 2.5 4.2 <5 Na % 1.64 1.67 1.98 2.48 2.04 0.49 0.72 1.25 1.59 2.00 1.74 Ni ppm 60 57 39 54 34 53 60 56 39 42 46 P ppm 1250 1000 900 1120 1170 1500 1750 1109 1079 1400 1129 Pb ppm 140 465 140 209 162 <20 <20 28 698 305 609 S total % <0.02 2.02 0.08 1.31 1.60 0.05 1.14 1.37 0.22 <0.02 2.78 S sulphide % <0.02 1.92 0.05 1.20 1.54 0.08 0.92 1.24 < 0.02 <0.02 2.78 Sb ppm 0.00 2.54 10.34 18.80 12.85 0.57 0.70 0.73 5.76 2.40 5.43 SiO2 % 53 53 59 60 57 59 54 59 59 54 56 Sr ppm 465 346 412 460 447 177 445 326 506 488 395 Te ppm 0.40 1.29 0.55 0.80 0.45 0.53 0.20 0.41 1.35 0.93 1.51 Ti ppm 5600 5000 4273 4520 4680 4533 4200 4313 4414 5333 4200 V ppm 190 163 153 147 151 157 120 124 161 187 146 Y ppm <100 < 100 <100 <100 <100 <100 <100 < 100 <100 <100 <100 Zn ppm 520 741 449 708 405 95 110 115 587 456 1428 Source: Gruyere CPR, 2021
P a g e 5 4 | 1 3 8 Given that the processing plant is currently treating mainly the Gruyere fresh ores, a comparison of the Golden Highway sample assays is made to the Gruyere fresh ore sample assays, as follows (focussing on those species that may have some relevance to mineral processing gold ores): Alaric metallurgical samples: o Relatively enriched in several base metals, including copper (Cu), iron (Fe), nickel (Ni), lead (Pb), and zinc (Zn); which can potentially be cyanide consuming species o Relatively enriched in calcium, magnesium, but lower concentrations of sodium o Relatively enriched in antimony (Sb), but depleted in arsenic (As) o Relatively enriched in silver (Ag), which can compete with gold for adsorption onto carbon o Relatively lower concentrations of silica (SiO2). Argos metallurgical samples: o As per Alaric, plus; o Relatively enriched in mercury (Hg) in comparison to the other Golden Highway deposits Attila metallurgical samples: o As per Alaric, except: o Similar concentrations in antimony (Sb) and zinc (Zn) to the lower concentrations at Gruyere o Relatively depleted in lead (Pb) in comparison to the other Golden Highway deposit samples Montagne metallurgical samples: o As per Alaric, except: o Significantly enriched in aluminium (Al) and lead (Pb) in comparison to the other Golden Highway deposit samples. The difference in multi-elemental assay results between Gruyere and the Golden Highway deposit samples reflect the geological differences between the deposits and does introduce some potential new processing performance risk associated with treating these satellite deposits. For example, the high concentrations of base metals may impact both cyanide consumption and the operational concentration measurement performance (for controlling cyanide dosage rates to leaching). Further to this, the high silver content (if cyanide soluble) could compete with gold for adsorption onto carbon in the CIL circuit and increase volumes of electrowinning cell precipitate generated, requiring additional material to the processed through the goldroom (calcining, fluxing, and smelting). Fortunately, the volumes of ore associated with the Golden Highway satellite deposits are significantly lower than Gruyere, which allows them to be blended into the mill feed with the “cleaner” Gruyere ores, to reduce the extent of the adverse impacts on mineral processing. Light blending of these ores with Gruyere ores is the recommended processing strategy. However, if there is a need (or decision made) to campaign process the Golden Highway ores such that they constitute most of the feed to the mill, some plant design changes may be required to be implemented (e.g., introduction of cyanide detoxification of CIL tails, upgrade to the capacity of the elution and electrowinning circuits), otherwise operating challenges could occur, potentially leading to lower recoveries. 10.2.2 Metallurgical recovery Gruyere A summary of the number and results of laboratory recovery tests carried out on Gruyere metallurgical samples grouped by weathering (oxide, transitional and fresh), and mining stage (1 to 7) is shown in Table 10.2.3. A consistent grind size P80 of 125 micron was used for all test results in Table 10.2.3.
P a g e 5 5 | 1 3 8 Table 10.2.3: Summary of Gruyere pit metallurgical samples quantities and average recovery results Mining stage No. samples Weathering Calculated head grade (Au g/t) Gravity recovery (%Au) Final Tails Grade (Au g/t) Overall recovery (Au g/t) 2 7 Oxide 1.36 51.35 0.04 97.03 5 Transitional 1.25 42.15 0.05 95.73 1 1 Fresh 1.59 48.08 0.15 90.79 2 17 1.19 59.91 0.10 91.25 3 15 1.54 58.37 0.12 92.36 4 15 1.42 64.07 0.11 92.40 5 11 1.43 63.09 0.11 92.10 6 7 2.13 63.02 0.12 94.41 7 6 1.17 29.51 0.12 90.05 Source: Gruyere CPR, 2021 Metallurgical test-work recovery results for the oxide and transitional metallurgical samples are consistently high, averaging 96.9 % and 95.7 % respectively. All oxide and transitional samples selected are located within Mining Stage 2. Due to the recent mining and processing activities, the oxide and transitional ores are mostly depleted, and most of the remaining ore is fresh. The test-work used for the oxide, transitional and fresh ores from mining stage 1 to 5, and 5 of the 7 samples for stage 6 were carried out using the Gold Road testing methodology, whereas the Gold Fields testing methodology was used for all samples used for mining stage 7, and 2 out of the 7 samples associated with mining stage 6. The Gold Fields test-work methodology typically returns lower gravity recoveries compared to the Gold Road method, but these lower gravity recovery results are more consistent with the actual plant gravity recoveries at approximately 30 % recovery. For Gruyere’s reserves cut-off grade determination, the recovery estimation models adopted are shown in Table 10.2.4. Table 10.2.4: Summary of Gruyere pit assigned metallurgical recovery estimation models Ore Type (weathering) Gold recovery estimation model Model Maximum Recovery Constraint Oxide Recovery(1) = 93.152 * Au^0.0548 96 Transition Recovery(1) = 93.152 * Au^0.0548 96 Fresh Recovery(1) = 90.511 * Au^0.0323 96 Notes: 1. Au = gold head grade (g/t) Source: Gruyere CPR, 2021 A comparison of the fresh ore recovery estimation model and the average metallurgical test-work recoveries by mining stage is shown in Figure 10.2.1. The existing plant has experienced only limited operating time processing near 100 % fresh ores. A comparison of the plant actual recovery results with the model recovery estimation results was undertaken early in 2021, which indicated that the plant results compare reasonably well with the recovery estimation model. However, confidence in this comparison is limited by the blending of mill feed with oxide and transitional ores, both which behave differently to the fresh ores with respect to recovery performance. This plant versus model comparison analysis is planned to be repeated early in 2022, with the benefit of lessor amounts of oxide and transitional ores blended into the mill feed. Figure 10.2.1: Comparison of Gruyere fresh ore recovery estimation model with test-work recoveries
P a g e 5 6 | 1 3 8 Source: Gruyere CPR 2021 Golden Highway A summary of the number and results of laboratory recovery tests carried out on Golden Highway metallurgical samples grouped by deposit and weathering (oxide, transitional and fresh) is shown in Table 10.2.5. A consistent grind size P80 of 125 micron was used for all test results in Table 10.2.5. Table 10.2.5: Summary of Golden Highway metallurgical samples quantities and average recovery results Deposit No. samples Weathering Calculated Head Grade (Au g/t) Gravity Recovery (%Au) Final Tails Grade (Au g/t) Overall Recovery (Au g/t) Attila 9 Oxide 6.50 15.74 0.14 97.8 4 Transitional 2.83 45.39 0.17 93.9 15 Fresh(1) 4.06 30.76 0.50 87.7 Alaric 1 Transitional 2.57 60.21 0.13 94.9 6 Fresh(1) 2.61 51.42 0.25 90.6 Argos 11 Oxide 1.16 14.83 0.14 87.8 5 Transitional 1.40 24.34 0.21 84.8 10 Fresh 2.40 26.18 0.36 85.1 Montagne 14 Oxide 1.78 15.37 0.21 88.4 3 Transitional 1.89 10.09 0.23 87.7 7 Fresh 1.84 22.57 0.26 86.1 Notes: 1. Dataset excludes samples tested at very high free NaCN concentrations (2,000 ppm) and finer grind sizes (less than 125 um P80) Source: Gruyere CPR, 2021 There was significant variability in the gold recovery for all the Golden Highway fresh ore metallurgical samples. A summary of the Golden Highway deposits grade-dependant recovery estimation models were derived from the metallurgical test-work and are shown in Table 10.2.6. Table 10.2.6: Summary of assigned Golden Highway metallurgical recovery estimation models 88 89 90 91 92 93 94 95 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 2.2 G o ld R ec o v er y ( % A u ) Gold Head Grade (g/t) Average testwork recovery Recovery by mining stage Recovery Estimation Model
P a g e 5 7 | 1 3 8 Deposit Ore type (Weathering) Gold recovery estimation model Model minimum recovery constraint Model maximum recovery constraint Attila Oxide Recovery = 92.0 % Transition Recovery = 88.0 % Fresh Recovery(1) = 4.5963 * Ln(Au) + 80.251 75 90 Alaric Oxide Recovery(1) = (Au - (0.16978 * Au^0.57809)) / Au * 100 Transition Recovery(1) = (Au - (0.16978 * Au^0.57809)) / Au * 100 Fresh Recovery(1) = (Au - (0.16978 * Au^0.57809)) / Au * 100 Argos Oxide Recovery(1) = (Au - (0.13147 * Au^0.90176)) / Au * 100 80 95 Transition Recovery(1) = (Au - (0.13147 * Au^0.90176)) / Au * 100 80 95 Fresh Recovery(1) = (Au - (0.13829 * Au^0.89)) / Au * 100 80 90 Montagne Oxide Recovery = 91.59 % Transition Recovery = 91.59 % Fresh Recovery(1) = (Au - (0.15338 * Au^0.66864)) / Au * 100 75 95 Notes: 1. Au = gold head grade (g/t) Source: Gruyere CPR, 2021 For Montagne and Argos, there were high levels of cyanide dissolvable copper in several of the leach residue solutions associated with a high weak acid dissociable (WAD) cyanide content in the tailings. A blending strategy with the Gruyere pit fresh ores will be required to mitigate this problem, alternatively a cyanide detoxification process would be needed to be added to the plant. To comply with the International Cyanide Management Code at Gruyere, the plant must achieve 50 ppm WAD CN, or less, at the tailings discharge point to the TSF. Within the Golden Highway samples, cyanide solubility of the contained copper and silver varied significantly but are at levels of significance to potentially impact process plant performance. Blending of the Golden Highway ores with Gruyere is therefore recommended and currently planned. 10.2.3 Ore hardness Gruyere Currently the processing plant is processing predominantly the harder and more abrasive fresh Gruyere ores, with some oxide and transitional ores blended in to optimise mill throughput when available. The original design nameplate capacity for the Gruyere plant was 7.5 Mtpa on 100 % fresh ore, however comminution circuit optimisation and reliability improvement programs are in progress, with the aim to progressively achieve annualised rates of 10 Mtpa in 2025. A total of 8.1 Mt and 8.4 Mt were processed in 2020 and 2021 respectively, increasing despite the reduction in the relatively softer oxide and transitional ore contributions to the mill feed blend 2021. A relatively large volume of historical rock hardness test-work has been undertaken on the Gruyere deposit at the ALS Metallurgy laboratory in Balcatta, Western Australia. For brevity, the discussion in this section will be constrained to the Gruyere fresh ore hardness properties since the Gruyere oxide and transitional ores are nearing depletion, and the hardness properties of the fresh ores dictate the milling throughput possible.
P a g e 5 8 | 1 3 8 Table 10.2.7 and Table 10.2.8 show a summary of the metallurgical sample’s SAG and Ball work index parameters (limited to those tests with a closing screen size of 150 micron for consistency) obtained from the indicated test-work programs. A plot of the SAG work index (Mia) and the Ball work index (Mib) is shown in Figure 10.2.2, which shows that the variability of the fresh ore sample’s results is relatively low (approximately ±10 %) for all samples, except two.
P a g e 5 9 | 1 3 8 Table 10.2.7: Summary of Gruyere fresh ore samples SAG Work Index (Axb, Mia) test results ALS sample ID Specific Gravity JKTech Drop Weight Test A-parameter JKTech Drop Weight Test b-parameter JKTech A*b SAG Index Mia (t/m³) (kWhr/t) A16624-Comp 44 2.73 94.5 0.34 32.1 23.3 A16624-Comp 46 2.77 85.7 0.38 32.6 23.0 A16624-Comp 49 2.73 94.4 0.36 34.0 22.5 A16624-Comp 52 2.74 92.0 0.38 35.0 21.9 A16624-Comp 55 2.71 86.8 0.42 36.5 21.2 A16624-Comp 58 2.72 91.1 0.41 37.4 20.7 A16624-Comp 61 2.71 81.8 0.44 36.0 21.5 A16624-Comp 64 2.72 86.0 0.40 34.4 22.3 A16624-Comp 66 2.71 84.2 0.45 37.9 20.4 A16624-Comp 68 2.72 100.0 0.34 34.0 22.1 A16652-Comp 71 2.71 100.0 0.35 35.0 22.0 A16652-Comp 77 2.71 90.0 0.39 35.1 21.5 A16652-Comp 80 2.72 100.0 0.33 33.0 22.6 A16652-Comp 83 2.70 90.4 0.40 36.2 21.1 A20286-Comp 01 2.67 100.0 0.35 35.0 21.7 A20286-Comp 02 2.72 100.0 0.33 33.0 22.8 A20286-Comp 03 2.67 100.0 0.34 34.0 22.4 A22550-Comp 1 2.68 88.8 0.34 30.2 24.4 A22550-Comp 2 2.67 100.0 0.28 28.0 26.3 A22550-Comp 3 2.68 85.9 0.39 33.5 22.5 A22550-Comp 4 2.67 89.5 0.37 33.1 22.6 A22550-Comp 5 2.69 73.2 0.58 42.5 18.6 A22550-Comp 6 2.67 97.8 0.33 32.3 23.5 Minimum 2.67 73.2 0.28 28.0 18.6 Average 2.71 91.8 0.38 34.4 22.2 Maximum 2.77 100.0 0.58 42.5 26.3 Source: Gruyere CPR, 2021 Table 10.2.8: Summary of Gruyere fresh ore samples Ball Work Index (BWI, Mib) test results ALS sample ID Specific Gravity BWI Screen Size BWI BWI test P80 Mib (t/m³) (um) (kWhr/t) (um) (kWhr/t) A16624-Comp 44 2.73 150 16.7 116 20.6 A16624-Comp 46 2.77 150 18.2 117 22.9 A16624-Comp 49 2.73 150 17.0 139 20.1 A16624-Comp 52 2.74 150 17.1 123 21.0 A16624-Comp 55 2.71 150 17.1 127 20.7 A16624-Comp 58 2.72 150 17.7 118 22.0 A16624-Comp 61 2.71 150 16.9 107 21.5 A16624-Comp 64 2.72 150 17.3 112 21.7 A16624-Comp 66 2.71 150 17.3 122 21.3 A16624-Comp 68 2.72 150 18.5 119 23.2 A16652-Comp 71 2.71 150 16.6 113 20.8 A16652-Comp 77 2.71 150 16.8 112 21.2 A16652-Comp 80 2.72 150 16.7 110 21.2
P a g e 6 0 | 1 3 8 A16652-Comp 83 2.70 150 17.8 113 22.5 A22550-Comp 1 2.68 150 16.9 124 20.8 A22550-Comp 2 2.67 150 14.1 97 17.7 A22550-Comp 3 2.68 150 16.4 106 21.0 A22550-Comp 4 2.67 150 18.2 115 23.2 A22550-Comp 5 2.69 150 14.5 97 18.5 A22550-Comp 6 2.67 150 16.4 119 20.1 Average 2.71 150 16.9 115 21.1 Notes: 1. BWI test data set used are those tests carried out with a test closing screen of 150 micron Source: Gruyere CPR, 2021 Figure 10.2.2: Gruyere fresh ore samples – SAG work index versus Ball work index(1) (BWI) plot Notes: 1. BWI test values shown are for tests undertaken with 150 micron closing screen Source: Gruyere CPR 2021 As a component of the current comminution circuit optimisation program, samples from the crusher product conveyor belt cut samples have been taken representing the fresh ores being treated during the fresh ore trial campaign periods in late 2020 to early 2021 and submitted to ALS Metallurgy for hardness testing. The resulting ore hardness parameters determined are consistent with those results shown in 15.0 16.0 17.0 18.0 19.0 20.0 21.0 22.0 23.0 24.0 18.0 20.0 22.0 24.0 26.0 28.0 B a ll W o rk I n d ex M ib ( k W h r/ t) SAG Work Index Mia (kWhr/t) Testwork Samples Plant Samples (2020-2021)
P a g e 6 1 | 1 3 8 Table 10.2.7 and Table 10.2.8. This suggests that the fresh ore hardness at Gruyere is relatively consistent throughout the pit, from current mining positions, through to final stage 7. A study is currently in progress aiming to attempt to develop a geometallurgical hardness model for Gruyere fresh ores, to better understand potential variability within the pit. Golden Highway As at the end-2021, there has been no mining activity undertaken associated with the Golden Highway deposits, so plant performance estimates are based on metallurgical test-work results only. Due to relatively low ore volumes, the relatively high base metal and silver contents, and other contained deleterious species, it is proposed to lightly blend ores mined from the Golden Highway deposits with the ore mined from the Gruyere pit. From a comminution throughput perspective, the Golden Highway fresh ores are important to consider, since the oxide and transitional Golden Highway ores will be softer. Table 10.2.9 shows a summary of the average test-work ore hardness parameters for the Golden Highway fresh ores, compared to the average Gruyere fresh ores. In comparison to Gruyere fresh ore, the following is evident from Table 10.2.9. All Golden Highway fresh ore samples have a high specific gravity than Gruyere fresh ores samples Attila fresh ore samples have a slightly harder SAG work index, but lower Ball work index, compared to Gruyere’s fresh ore samples Alaric fresh ore samples has very similar hardness properties to Gruyere fresh ore samples Argos and Montagne fresh ore samples are both significantly softer in both SAG and Ball Work indices than Gruyere fresh ore samples BWI test product size distributions using a 180-micron closing screen is similar to Gruyere’s BWI test using a 150-micron screen, both of which are close to the plant’s current grind size target. Table 10.2.9: Summary of Golden Highway and Gruyere fresh ore samples hardness test results Deposit No. samples Weathering Specific Gravity JKTech A*b SAG Index Mia BWI test Screen Size BWI test P80 BWI Ball Index Mib (t/m³) (kWhr/t) (micron) (micron) (kWhr/t) (kWhr/t) Attila 11 Fresh 2.80 31.9 23.6 180 118.9 14.8 17.8 Alaric 2 Fresh 2.82 34.3 22.2 180 121.6 16.9 20.7 Argos 3 Fresh 2.79 52.4 15.9 180 117.3 12.2 14.1 Montagne 2 Fresh 2.87 50.4 16.2 180 119.3 11.6 13.2 Gruyere(1) 20 Fresh 2.71 34.4 22.2 150 115.3 16.9 21.1 Notes: 1. BWI test data set used are those tests carried out with a test closing screen of 150 micron Source: Gruyere CPR, 2021 10.2.4 Abrasion Index Abrasion index has some relevance for the Gruyere plant, due to the relatively high wear rates currently being experienced while processing the Gruyere fresh ores, which is impacting mill downtime and costs.
P a g e 6 2 | 1 3 8 Table 10.2.10 shows a summary of the average abrasion index test results for the samples from the Gruyere and Golden Highway deposits. The abrasion index for the Gruyere fresh ore is elevated, however is lower for the stage 7 samples. The abrasion indices for the Golden Highway deposit samples are significantly lower than those measured for the Gruyere fresh ore samples.
P a g e 6 3 | 1 3 8 Table 10.2.10: Summary of Gruyere and Golden Highway abrasion index test results Deposit Mining stage Weathering Abrasion index Gruyere 2 Oxide 0.20 Transitional 0.38 1 Fresh 0.52 2 0.58 3 0.46 4 0.52 5 0.55 6 0.45 7 0.28 Attila 0.11 Argos 0.06 Montagne 0.18 Source: Gruyere CPR, 2021 10.3 Plant Sampling and reconciliation Plant feed tonnage is measured via regularly calibrated weigh scales (weightometers) on the mill feed conveyor belt. Daily composite samples of processing plant feed and tailings streams are taken to assist in gold accounting on site. These are collected using a combination of automatic sampling stations as well as manual cuts using properly designed samplers. Analysis of the composites includes gold contained in solids, solutions, and carbon forms. The analysis of samples used for accounting purposes is conducted by the Gruyere site laboratory. The laboratory facilities include sample preparation, fire assay and a wet analysis area. Solid sample composites are analysed using fire assay with an AAS finish. Carbon sample composites are assayed using high temperature ashing, acid digest and an AAS finish. Solution sample composites are assayed using DIBK extraction and an AAS finish. All laboratory assaying procedures are aligned with standard industry practices. In accordance with Gold Fields Plant Metal Accounting Standard, a gold in circuit inventory is undertaken monthly to reconcile (by mass balance) the back-calculated gold grade of the mill feed with the mill feed grade estimates obtained using daily plant samples and assays. The monthly variance between the assayed grade and the back-calculated grade is monitored, and an investigation is initiated if this variance exceeds the minimum allowable levels outlined in the Gold Fields Plant Metal Accounting Standard. Bullion samples are taken when required by vacuum sampling from each gold pour. These samples are used as an estimate prior to receiving official outturn assays provided by the Perth Mint. 10.4 Deleterious Elements The test-work procedures includes analysis for elements that could be deleterious to plant recovery (e.g., arsenic, tellurium, antimony, organic carbon). For Gruyere, to date no specific deleterious mineral species have been identified that significantly impacts the processing plant. The potential deleterious impact of silica (SiO2) on processing equipment wear is quantified using an abrasion index test, carried out by ALS Metallurgy on selected core samples. For the Golden Highway deposit samples several potential deleterious species have been identified, including base metals (especially copper). The particular deleterious species identified to date, can be managed through careful and light blending of the Golden Highway ores with the main Gruyere pit ores.
P a g e 6 4 | 1 3 8 10.5 Metallurgical Risks In the opinion of the Qualified person, the combination of an established processing plant with operating experience of treating the Gruyere ore mined, together with the ongoing and active metallurgical test-work program assessing core samples selected from future local mineralisation areas, provides a reasonable platform for estimating the associated metallurgical and processing modifying factors underpinning the 2021 reserves. However, the reader should be aware that uncertainties remain, and some key potential areas of risk and uncertainty are discussed in the following sections. 10.5.1 Sample Representativity Metallurgical sample selection is an important aspect of the process of developing resources into reserves. The results of the test-work undertaken on those samples are often used directly as input into plant performance estimates that are then used for the life of mine and reserve’s financial evaluations. It is important that the metallurgical samples are representatively selected, for example, to cover a suitable range of gold head grades, to consider the different geological lithologies and domains expected to be encountered, and to appropriately incorporate internal and external material dilution expected during the mining process. Individually testing different head grades ranges and geological domains improves the ability to see the metallurgical response variability of the orebody, which improves the ability to make better judgements and estimates about how the material could perform in the processing plant. As new potentially economic mineralised areas are identified at the mine, the site’s exploration geologists and metallurgists will select a few, to several, core composite samples of each new mineralisation area, and submit to a commercial metallurgical laboratory for the undertaking of a defined test-work program including, head assays, recovery, and physical properties analyses. Whilst effort and care are taken with the sample selection process, there are practical constraints to samples numbers due to core availability and test-work cost, and therefore it is not possible for the Qualified person to guarantee that the proposed reserves have been fully representatively sampled, and therefore some inherent uncertainty will remain. 10.5.2 Laboratory Test Methods and Scale-up The laboratory test results require scale-up to estimate performance through the industrial processing facility. The metallurgical testing regime adopted has been specifically tailored to provide results that reasonably and practically represent the actual installed processing facility. This regime has been developed from experience gained over many years of undertaking such work, culminating in eventual mining, and processing of ores that have been historically metallurgically tested. Gravity and leach recoveries achieved in the laboratory are assumed to be achievable within the plant. Overall laboratory recovery results are typically model-fitted to a bounded sample head grade relationship, and this resulting model is assumed to be reasonably achievable at plant scale. Hardness properties are applied to the Morrell Total Power method to estimate grinding mill throughputs. However there remains potential risk associated with the delivery of these metallurgical testing results associated with the differences between laboratory methods and full-scale processes, and miscellaneous and unidentified errors associated with undertaking the testing. The selected laboratory (ALS Metallurgy, Balcatta, Western Australia) that is undertaking the metallurgical test-work is highly regarded within the local gold mining industry, and has an established history of performing well, with both Gold Fields and the Qualified person. No pilot-plant testing is carried out prior to reserve declaration and subsequent mining, and the metallurgical properties are based on bench scale test results only. The sample requirements and cost for pilot testing are considered as being prohibitive. However, given the relative simplicity of Gruyere’s processing facility, operating experience, and in being
P a g e 6 5 | 1 3 8 consistent with practices adopted for other similar operations, it is the opinion of the Qualified person that pilot plant testing is not required for the estimation of plant modifying factors for the 2021 reserves. Despite reasonable efforts and care in the application of scale-up factors and modeling methods, there remains some inherent uncertainty in actual performance of the industrial facility predicted from a small volume of small-scale laboratory tests. One of the key challenges in confirming scale-up is the practice of ore blending of the plant feed (to optimise overall performance of the plant) which will be applicable to the processing of the future Golden Highway deposits. 10.5.3 Deleterious Elements The routine metallurgical test-work program includes detailed head analysis (multi-element ICP-MS scan) to check for quantities of potential deleterious elements to the plant, such as mercury, arsenic, organic carbon, antimony, tellurium, base metals, etc. Whilst this assessment is carried out on the limited number of metallurgical composite samples, it is not typically undertaken on individual exploration samples. The multi-elemental assay results obtained from the metallurgical samples are used as a guide to identify if there are any deleterious elements at concentrations that would be of reasonable concern that could materially impact plant performance. If such a species is identified then the option to submit a larger number of individual exploration samples for detailed analysis, to better quantify and locate the deleterious species, is readily available. However, it needs to be recognised that the relatively low number of metallurgical samples initially checked for deleterious elements means that some inherent risk remains of unexpectedly encountering such a species during subsequent mining and processing operations, despite such elements not being identified during metallurgical testing.
P a g e 6 6 | 1 3 8 11 Mineral resource estimates 11.1 Mineral resources estimation criteria Software currently in use for Mineral resource estimation include Snowden Supervisor® (statistical analysis and variography), Datamine Studio® (estimation), Isatis® (non-linear estimation) and Leapfrog® software (geological model construction). Drill hole data is exported from the acQuire® database to a comma separated text file format using a standard export routine. The drill hole data is subset for the model area with only DD and RC drill holes used in the grade estimates. 11.1.1 Geological model and interpretation The Gruyere Mineral resources are estimated from 3D inventory models of the in-situ mineralisation constructed through a process of geological interpretation followed by grade estimation. Geological interpretations are carried out by reviewing logging data in plan, section and in orthogonal 3D views. Interpretations are built up systematically representing primary geology, structure, weathering and mineralisation. Geological surfaces and volumes are represented using wireframes. These are generated through triangulation or interpolation techniques based on intervals selected by the geologist from the drill holes. Prior to grade estimation and modelling, the geological interpretations undergo a documentation, peer review and signoff process. All files used and created in the interpretation process are stored in the main database. Currently, implicit processes in Leapfrog® define the higher mineralised portions with the main estimation domain. This method applies an appropriate cut-off and continuity orientation to define this higher mineralised portion. The results are considered against new data and increasing geological understanding for appropriateness. As the interpretations are constructed from the original drill hole logging information, they are constantly reviewed. If the logging data does not fit the conceptual model or the surrounding holes in the interpretation, a validation/review of the original logging is carried out. This may result in re-logging of the hole or a change to the model and interpretation depending on the outcome of the review. Cross-cutting dykes, faults and intrusive bodies are accounted for in the interpretation process where they are sufficiently large enough to impact on the mineralised bodies. Geological interpretation and modelling are iterative processes that evolve as new data and ideas become available. Alternative interpretations are often evaluated at an early stage before they reach a resource level. Usually only one interpretation is submitted for resource evaluation; however, the interpretation(s) is one that most geologists would independently determine and report. This is confirmed by ongoing peer, corporate and external audits and reviews. 11.1.2 Block modelling 3D block models are used to represent the volume of the in-situ mineralisation and are constructed based on the geological interpretations constrained by the wireframes. The block models utilise sub-celling to ensure the block model volume closely represents the volume of the wireframe model. The block sizes used for the various resource models are presented in Table 11.1.1. 11.1.3 Bulk density Dry bulk density is assigned to the model based on the geological interpretation of lithology and weathering. Average density values are determined for each geological unit. The bulk densities applied are summarised in Table 7.5.1. 11.1.4 Compositing and domaining Analysis of the grade data is carried out prior to estimation. Samples are composited for analysis and estimation. Compositing for mineralisation is at 1 m intervals for Gruyere, Attila, Alaric, Argos and Orleans and 2 m intervals for Montagne.
P a g e 6 7 | 1 3 8 The composited output assay database is uniquely flagged with mineralised domain codes using the interpretation boundaries. Additional sub-domains may be added where distinct grade populations exist within the broader interpretation domains. The relationship between domains is assessed to determine how they are used during interpolation. Distinct domains utilise hard grade boundaries during interpolation. Where domains share similar gold distribution characteristics, a soft or gradational boundary is used for interpolation. 11.1.5 Top cuts Top cuts (capping) are applied to control outlier grades during estimation where required. Top cuts are determined per domain through analysis of probability plots, histograms and reviewing the samples at the top end of the grade distribution. Commonly the selected thresholds correspond to the 97.5th to 99th percentiles of the distribution. Grades above a selected threshold are capped to the threshold therefore retaining the high-grade nature locally while controlling the influence on the estimation. The top cuts used for the various resource models are presented in Table 11.1.1. 11.1.6 Variography Variogram studies are carried out on composited data for individual domains. The variogram model reflects the direction and extent of spatial continuity of the mineralisation within each specific estimation domain and should reflect observed or understood underlying geological controls. The variogram search parameters used for the various resource models are presented in Table 11.1.1. The Qualified person’s opinion is that the variographies are practical reflection of the spatial continuity of the respective mineralization grades and their application to the geostatistical analysis is adequate to minimize uncertainty and to derive appropriate resource block models for use by the planning engineers. 11.1.7 Grade estimation Geostatistical grade estimation techniques such as ordinary kriging (OK), conditional simulation (CS) and uniform conditioning (UC) are applied at Gruyere. The CS and UC recoverable estimates are further localised on a selective mining unit (SMU) scale. The estimation of grade into the block model uses the geological interpretation to reflect the controls on gold mineralisation. The estimation technique is selected based on the geological model, data spacing and statistical and spatial analysis of the grade data. The grade estimation parameters are presented in Table 11.1.1. For Attila, Alaric, Montagne, Argos, Orleans, Central Bore, YAM14 and the measured portion of Gruyere, the search ellipsoids are orientated to the principal direction specific to each domain. A multiple pass approach is used for interpolation within the estimated domains. The first pass uses the optimised search parameters for the lode at the nominal drill spacing. With each subsequent pass, the minimum number of samples is reduced, and the search volume is increased. This approach is used to enable most blocks to receive a grade estimate within the domains. The approach is slightly different for non-linear estimate portions at Gruyere which represents the indicated and inferred areas. A spherical search informs the simulation nodes, which provides the initial base for the final estimation. This final estimation applies a linear estimate to a subset of the simulated nodes selected to replicate the intended grade control spacing. The search strategy is aligned to the orientation of the principal direction of continuity with no octant methods employed. In general, the directional ranges determined from the modelled variograms are used to constrain the search distances applied to the linear estimates. The ranges are also used as an aid in resource classification. Generally, any model cells unsupported by data will need to be estimated beyond the ranges. Gold is the only grade variable considered and as such no correlations between elements are made for resource estimation. Correlations of multi-element data are used to help classify different rock units for stratigraphic identification purposes as well as for exploration targeting and vectoring purposes. The model grade is diluted for LoM and Resrve reporting purposes by applying an mineable stope optimiser MSO process to define the selectivity against mining practices. The MSO application replicates the “As mined” layout and intends to dilute the grade locally. The MSO parameters are run with a minimum mining width of 5 m and 0.5 m
P a g e 6 8 | 1 3 8 dilution skin. This is considered appropriate for Gruyere. The diluted grades are only applied for Mineral reserves. The Mineral resource applies the original insitu grade. 11.1.8 Selective mining units (SMU) The SMU size (the smallest volume of material on which ore/waste classification is determined in open pit operations) is currently assessed at 12.5 mN x 5 mE x 5 mRL (Gruyere) and 25 mN x 5 mE x 5 mRL (Attila, Alaric Montagne, Argos and Orleans). Where there is sufficient data density, grade estimation is carried out directly to SMU sized blocks and the final grade estimates are applied to the SMU block sizes. Within the indicated and inferred portions of Gruyere, a recoverable resource estimation technique is applied which localises the conditional simulation into SMUs. In these portions, the SMUs represent the final grades which have been localised within panel blocks of 50 mN x 15 mE x 25 mRL. The process aims at overcoming any potential smoothing effect arising from wide spaced data. Linear OK is applied to the measured portions. A more traditional linear OK estimate is applied at Attila, Alaric, Montagne, Argos and Orleans into parent cell sizes of 25 mN x 5 mE x 5 mRL. These cell sizes are optimised using a kriging neighbourhood analysis. The parent cells are then sub-celled to represent the volume within the domain. Table 11.1.1: Summary of December 2021 Mineral resource estimation parameters Mineral resource Search distances Min, max samples1 Parent cell sizes (X, Y, Z) Domains Grade estimator Sample types Composite length Top cuts2 Date Gruyere Simulation: From 300 m x 200 m x100 m (Domain 5050), 150 m x 70 m x 20 m (Domain 5051) and 220 m x 100 m x 30 m (Domain 5052) Linear estimate: 60 m x 40 m x20 m 8; 30 5 m x 12.5 m x 5 m Lode, weathering & lithology Localised recoverable estimate using information effect corrected conditional simulation (inferred and indicated) OK applied to measured Surface RC and DD core 1 m 20 – 23 g/t Au Aug 2020 Attila 200 m x 150 m x 25 m 13, 30 5 m x 25 m x 5 m Lode, weathering & lithology 3D OK Surface RC and DD core 1 m 25 g/t Au Oct 2020 Alaric 130 m x 60 m x 10 m 12, 30 5 m x 25 m x 5 m Lode, weathering & lithology 3D OK Surface RC and DD core 1 m 3 – 25 g/t Au Jun 2017 Montagne 130 m x 80 m x 20 m 12, 24 5 m x 25 m x 5 m Lode, weathering & lithology 3D OK Surface RC and DD core 2 m 10 – 25 g/t Au Oct Argos 130 m x 80 m x 20 m 12, 24 5 m x 25 m x 5 m Lode, weathering & lithology 3D OK Surface RC and DD core 1 m 8 – 25 g/t Au Oct 2020 Orleans 130 m x 80 m x 20 m 12, 24 5 m x 25 m x 5 m Lode, weathering & lithology 3D OK Surface RC and DD core 1 m 8 – 25 g/t Au Dec 2018 YAM14 130 m x 80 m x 20 m 12, 24 5 m x 25 m x 5 m Lode, weathering & lithology 3D OK Surface RC and DD core 1 m 2.5 – 15 g/t Au Jan 2018 Central Bore 100 m x 50 m x 20 m 8, 24 10 m x 5 m x 10 m Lode, weathering & lithology 3D OK Surface RC and DD core 1 m 5 – 700 g/t Au Dec 2018 Notes: 2. first pass min and max sample numbers shown 3. based on statistical analysis by domain/lode, varies by domain/lode. The range of top cuts is shown in the table. Source: Gruyere CPR, 2021 11.1.9 Model validation Visual inspections and documented model reconciliation reviews/reporting are the main validation procedures used. These include a review of the sections and plans with the models checked for proper coding of drill hole intervals and block model cells. Interpolated grades are examined relative to drill hole composite values.
P a g e 6 9 | 1 3 8 Other model validation checks include: Comparative statistics. Global bias and local trends in the estimate. Comparative checks of grades between other interpolation methods. Swath plots. Global change of support. Slope of Regression and Kriging Efficiency (linear estimates). Over the past 12 months of available production data, the grade control model has reconciled well returning a mine call factor (MCF) of 95 %. In addition, the MSO dilution process which intends to predict the practical mining limitations on the selectivity of ore, has performed within a few percentage of expectations. 11.1.10 Cut-off grades Cut-off grades are influenced by the operating strategy, design and scheduling, and are therefore calculated annually. Open pit The cut-off grades for the open pit Mineral resources by deposit are summarised in Table 11.1.2. Table 11.1.2: Gruyere open pit resource cut-off grades Resource area Resource cut-off grade (g/t Au) RoM Resource mining dilution (%) Resource cut-off grade (g/t Au) Bench MSO Gruyere Oxide 0.39 105 % 0.41 Gruyere Transition 0.41 105 % 0.43 Gruyere Fresh 0.42 105 % 0.44 Atilla Oxide 0.44 119 % 0.52 Atilla Transition 0.49 119 % 0.58 Atilla Fresh 0.56 119 % 0.66 Alaric Oxide 0.44 121 % 0.53 Alaric Transition 0.47 121 % 0.57 Alaric Fresh 0.51 121 % 0.62 Montagne Oxide 0.44 107 % 0.48 Montagne Transition 0.46 107 % 0.50 Montagne Fresh 0.54 107 % 0.58 Argos Oxide 0.48 114 % 0.55 Argos Transition 0.51 114 % 0.57 Argos Fresh 0.52 114 % 0.58 Notes: Source: Gruyere COG Report, 2021 The open pit resources are constrained to an optimal shell defined by a resource gold price of $1,500/oz and relevant unit costs and modifying factors. Optimisation of the resource pit shell is carried out using Geovia Whittle software. The cut-off grade is calculated for the material within the pit shell using the following formula: [Ore Premium Mining Costs ($/t) + Process Costs ($/t) + Site G&A Costs ($/t)] [Price x (100 % - Ad valorem Royalty Rate) – All product related costs] x PRF x MCF x 0.03215075
P a g e 7 0 | 1 3 8 Where: Ore Premium Mining Costs cover adjustments in ore haulage distances and differences in ore and waste drill and blast costs. All other mining costs are accounted for during the pit shell generation phase. Process Costs including sustaining capital. Site G&A Costs including off-site general and administration (G&A) costs directly related to site (e.g. accounting or payroll services). Price is the gold price per ounce ($1,500/oz). The Royalty Rate is 2.5 %. All product related costs include management fees, refining costs and contributions to the Gold Fields Foundation per ounce. PRF is the plant recovery factor or metallurgical recovery as a percentage estimated at a grade close to the cut-off grade. MCF is the mine call factor or the percentage of actual mill produced metal against the claim of metal produced. 0.03215075 is the ratio of troy ounces per gram. Mining dilution and mining recovery to get the cut-off grades to in-situ. In-situ is the point of reference for resources – The ROM cut-off is diluted and recovered thus applicable to the in-situ Resource MSO’s. Gold Fields conducts an annual review of metal prices for Mineral resource and Mineral reserve reporting to monitor any significant changes that would warrant re-calibrating the price deck for strategic and business planning purposes. This review takes into account prevailing economic, commodity price and exchange rate trends, together with market consensus forecasts, including from global industry analysts and financial institutions, as well as Gold Fields’ strategy and expectations for the mine operations. The Mineral resource and Mineral reserve gold prices have been selected and justified by the Qualified person at $1,500/oz per troy ounce (oz) for resource and at $1,300 per troy ounce (oz) for reserve (life of mine planning and reserve techno-economic modelling). This metal price deck has also been reviewed and endorsed by the Company executive team. For more information on the rationale applied to deriving the Mineral resource and Mineral reserve metal price deck refer to chapter 16. The selected resource gold price of $1,500/oz is at a 15 % premium to the reserve price with the differential being in general alignment with Gold Fields standard practice for setting the Mineral resource price. The 15 % premium on resources is to provide useful information on the sites resource potential and its impact at higher gold prices and to indicate possible future site infrastructure, permitting, licensing, mining footprint and tailings and waste storage requirements. This information is important to determine the Reasonable prospects of economic extraction for the Mineral resources. The Qualified person has concluded that reasonable prospects for economic extraction have been demonstrated through the application of an appropriate level of consideration of the potential viability of the Mineral resources. These considerations include a reasoned assessment of the geological, engineering (including mining and processing parameters), metallurgical, legal, infrastructural, environmental, marketing, socio-political and economic assumptions which, in the opinion of the Qualified person, are likely to influence the prospect of economic extraction. Although all permitting may not be finalised for some Mineral resources, there is no reason to expect that these permits will not be granted based on existing processes and protocols. 11.1.11 Classification criteria Gruyere’s in-situ Mineral resources are classified as either measured, indicated or inferred in accordance with the definitions in Subpart 229.1300 of Regulation S-K. Measured Mineral resources are drilled to a nominal grid spacing of 12.5 m to 25 m by 25 m. Indicated Mineral resources are defined by a nominal grid spacing of 25 m to 50 m by
P a g e 7 1 | 1 3 8 100 m depending on geological complexity. Inferred Mineral resources are defined by a nominal grid spacing of 100 m by 100 m or greater depending on geological complexity. The resource classification criteria by resource area are summarised in Table 11.1.3. Table 11.1.3: Gruyere resource classification criteria by area Mineral resource Mineral resource category Nominal drill hole grid spacing range length (m) x width (m) Geological setting Gruyere Inferred 100 mN x 100 mE Broad continuous mineralisation hosted within quartz monzonite felsic intrusive. Continuity is stronger in the strike direction which supports the classification criteria Indicated 100 mN x 50 mE/25 mE Measured 12.5 mN/25 mNx12.5 mE/25 mE Alaric Inferred 100 mN x 50 mE Mineralisation manifests as parallel steep dipping 5 m – 20 m wide zones hosted within a volcaniclastic assemblage. Continuity is stronger in the strike direction which supports the classification criteria Indicated 50 mN x 25 mE Montagne Inferred 100 mN x 50 mE Mineralisation manifests as parallel steep dipping 5 m – 20 m wide zones hosted within a volcaniclastic assemblage. Continuity is stronger in the strike direction which supports the classification criteria Indicated 50 mN x 25 mE Argos Inferred 100 mN x 50 mE Mineralisation manifests as parallel steep dipping 5 m – 20 m wide zones hosted within a volcaniclastic assemblage. Continuity is stronger in the strike direction which supports the classification criteria Indicated 50 mN x 25 mE Orleans Inferred 100 mN x 50 mE Mineralisation manifests as parallel steep dipping 5 m – 20 m wide zones hosted within a volcaniclastic assemblage. Continuity is stronger in the strike direction which supports the classification criteria Attila Inferred 100 mN x 50 mE Mineralisation manifests as parallel steep dipping 5 m – 20 m wide zones hosted within a volcaniclastic assemblage. Continuity is stronger in the strike direction which supports the classification criteria Indicated 50 mN x 25 mE Yam14 100 mN x 50 mE Mineralisation manifests as parallel steep dipping mineralised zones hosted within the Dorothy Hills Shear Zone and specifically a low Ti Felsic host. Continuity is stronger in the strike direction which supports the classification criteria 50 mN x 12.5/25 mE Notes: a) Geological considerations include continuity and grade b) ²Resource classification is based on geological continuity, grade continuity, drill hole/sample spacing, sample data quality, estimation quality, mining development (amount of exposed and mapped mineralization) and mining history. The Measured category also requires Grade control and mapping information. c) The Qualified person is of the opinion that the estimation follows good practice and reduces estimation bias. Source: Gruyere CPR, 2021 Mineral resource classification categories are determined by considering the magnitude and materiality of inherent uncertainty. The greatest source of this uncertainty is a combination of the geological and mineralisation uncertainty relative to the spacing of the data informing the estimate. This can be quantified to some extent in the case of linear estimation by error output parameters such as kriging efficiency (KE) and slope of regression (SOR). The KE is a measure of accuracy of the estimate to the actual estimate, often referred to as a goodness of fit measure. The SOR determines the incurred conditional bias associated with an estimate. The QP reviews these parameters relative to an overarching understanding of the geology in determining the appropriate classification. Reconciliation indicates that the classifications applied to the Gruyere Joint Venture deposits is appropriate.
P a g e 7 2 | 1 3 8 The Qualified person is of the opinion that: b) Inferred Mineral resource has an even chance of converting to indicated Mineral resource with continued exploration, additional empirical data and evolving geoscientific modelling. c) The Mineral resource demonstrates reasonable prospects for economic extraction over the indicated study time frame The Mineral resource gold price of $1,500/oz is at a 15 % premium to the reserve price with the differential being in general alignment with Gold Fields standard practice for setting Mineral resource price. The 15 % premium is to provide information on Gruyere resource potential at higher gold prices and to indicate possible future site infrastructure, permitting, licencing, SLO, mining footprint and infrastructure requirements The Qualified person’s opinion is that, whilst effort and care are taken with the resource estimation and classification processes, increase in geological knowledge and available data will reduce the level of uncertainty, and therefore some inherent uncertainty will remain.
P a g e 7 3 | 1 3 8 11.2 Mineral resources as of 31 December 2021 The Gruyere Mineral resources exclusive of Mineral reserves as of 31 December 2021 are summarised in Table 11.2.1. The Mineral resources are 50 % attributable to Gold Fields and are net of production depletion up to 31 December 2021. The point of reference for the Mineral resources is in-situ without dilution applied. Table 11.2.1: Gruyere - summary of gold Mineral resources at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,500/oz Resources (exclusive of Mineral reserves) Cut-off grades/ (g/t Au) Metallurgical recovery/ (%) Amount/ (kt) Grades/ (g/t Au) Amount/ (koz Au) Open Pit Mineral resources OP measured Mineral resources 46 1.0 1 0.4 to 0.7 81 to 95 OP indicated Mineral resources 13,886 1.4 610 0.4 to 0.7 81 to 95 OP measured + indicated Mineral resources 13,932 1.4 611 0.4 to 0.7 81 to 95 OP inferred Mineral resources 17,730 1.4 781 0.4 to 0.7 81 to 95 Underground Mineral resources UG measured Mineral resources UG indicated Mineral resources UG measured + indicated Mineral resources UG inferred Mineral resources 121 13 51 0.4 to 0.7 81 to 95 Stockpile Mineral resources SP measured Mineral resources SP indicated Mineral resources SP measured + indicated Mineral resources SP inferred Mineral resources Total Gruyere Mineral resources Total measured Mineral resources 46 1.0 1 81 to 95 Total indicated Mineral resources 13,886 1.4 610 81 to 95 Total measured + indicated Mineral resources 13,932 1.4 611 81 to 95 Total inferred Mineral resources 17,851 1.4 832 81 to 95 Notes: a) Rounding of figures may result in minor computational discrepancies b) Mineral resources are exclusive of Mineral reserves. Rounding of figures may result in minor computational discrepancies. c) No year on year Mineral resource comparison is presented as Gruyere did not disclose an exclusive Mineral resource in 2020 d) Quoted as diluted in situ metric tonnes and grades. Metallurgical recovery factors have not been applied to the Mineral resource estimates. The approximate metallurgical recovery factor of 81 % to 95 %. The metallurgical recovery is the ratio, expressed as a percentage, of the mass of the specific mineral product recovered from ore treated at the process plant to its total specific mineral content before treatment. Gruyere mining operations vary according to the mix of the source material (e.g. oxide, transitional, fresh and ore type blend). e) The metal prices used for the 2021 Mineral resources are based on a gold price of $1,500 per ounce or A$2,000 per ounce (at an exchange rate of A$1:$0.75). Open pit Mineral resources at the Australian operations are based on revenue factor 1 pits and the underground Mineral resources on appropriate mine design and extraction schedules. The gold price used for Mineral resources approximates 15 % higher than the selected Mineral reserve. f) The cut-off grade may vary per shaft, open pit or underground mine, depending on the respective costs, depletion schedule, ore type, expected mining dilution and expected mining recovery. The average or range of cut-off grade values applied to the Mineral resources are; Gruyere 3.5g/t Au mill feed (underground) and 0.41 g/t to 0.66 g/t Au (open pit). g) The Mineral resources are based on initial assessments at the resource gold price of $1,500/oz and consider estimates of all Gruyere costs, the impact of modifying factors such as mining dilution and mining recovery, processing recovery and royalties. Mineral resources are also tested through the application of Environmental, Social and Governance (ESG) criteria to demonstrate reasonable prospects for economic extraction. h) The Mineral resources are estimated at a point in time and can be affected by changes in the gold price, US Dollar currency exchange rates, permitting, legislation, costs and operating parameters. Source: Gruyere CPR, 2021
P a g e 7 4 | 1 3 8 The Mineral resources are based on initial assessments at the resource gold price of $1,500/oz and consider estimates of all Gruyere costs, the impact of modifying factors such as mining dilution and recovery, processing recovery and royalties to demonstrate reasonable prospects for economic extraction. 11.3 Audits and reviews The 31 December 2020 Mineral resource estimate was externally audited by external and independent consultant Golder Associates, who concluded that the Mineral resource was generated, classified and reported to the appropriate technical standard with no material areas of non-compliance identified. The best practices employed were carried over into the 31 December 2021 estimate. External Mineral resource and reserve audits are performed on a rolling three- year cycle. The Mineral resource estimate is underpinned by appropriate Mineral resource management processes and protocols to ensure requisite corporate governance in respect of the intent of the Sarbanes-Oxley Act of 2002 (SOX). Technical and operating procedures developed for Gruyere are designed to be compliant with the SOX framework and risk assessment control matrix (RACM) as adopted by Gold Fields for Mineral resource and Mineral reserve estimation, reporting and auditing. Gold Fields uses K2Fly RCubed© propriety software in combination with SharePoint to ensure accuracy, governance, auditability and security in the reporting of Mineral resources and Mineral reserves. 11.4 Comparison 31 December 2021 with 31 December 2020 Mineral resource No Resources were disclosed in 2020. Resources have not been reported on this stock exchange previously, however, in the Qualified persons opinion the 2021 to 2020 resource comparison changes are not material.
P a g e 7 5 | 1 3 8 12 Mineral reserve estimates 12.1 Level of assessment Gruyere’s Mineral reserves are that portion of the Mineral resources which, as technical and economic studies have demonstrated, can justify extraction as of 31 December 2021. The Mineral reserves are based on appropriately detailed and engineered life of mine plans and are supported by relevant studies completed to a minimum pre-feasibility study level. The life of mine plans are based on measured and indicated Mineral resources converted through the application of appropriate modifying factors to derive Mineral reserves estimates A pre-feasibility study has an estimated accuracy for operating and capital costs of ±25 % with a contingency of no more than 15 %. All mine design and scheduling is completed by experienced engineers using appropriate mine planning software and incorporates relevant modifying factors, cut-off grades and the results from other techno-economic investigations. Mining rates, fleet productivities, operational and plant capacities and constraints are accounted for in the plan and are typically based on historical performance trends. All geotechnical protocols and constraints are accounted for in the plan, including the provision for suitable mining geometries, mining losses, mining recovery and dilution. Provision is also made for sufficient waste rock and tailings storage with plans in place to meet the life of mine requirements. The Company’s mine closure plans comply with in-country legal requirements and are approved by the regulator. Integrated mine closure plans provide appropriate cost parameters for operational and life of mine planning as well as end of life mine closure commitments. The point of reference for the Mineral reserves is ore delivered to the processing facility, also known as the run of mine or ROM. The Qualified person’s opinion of the 2021 Mineral reserve estimates is: a) The modifying factors are based on recent mining and processing extraction history and performance and are reasonable and appropriate to derive the reserves from the resources and minimize any estimation errors. The modifying factors are aligned with leading industry technical practice, for example, blended process recovery is used in the reserve estimate. b) Gruyere has grown its Mineral reserves over the past three reporting cycles net of depletion. Infrastructure, environmental, permitting, closure, utilities and baseline studies are all aligned to support continued Mineral reserves growth. Gruyere’s proactive study pipeline retains a focus on progressing all key work integral to supporting ongoing life of mine extensions so as to avoid any potential production delays. For example, a study has been completed to extend tailings disposal capacity. c) The indicated and measured Mineral resource is sufficient in geoscientific confidence to complete final life of mine designs. However, it is usual to complete a final phase of infill drilling to determine a high confidence ‘mine defined’ resource with detailed geoscientific information prior to final stope design, pillar layouts and detailed production scheduling. d) The reported reserve is a ‘point in time’ or snapshot of the life of mine plan as at 31 December 2021. It is supported by a technically valid and economically viable mine design and schedule combining open pits and three underground mines. The techno-economic work does not exceed the estimated accuracy of ±25 % and or require more than 15 % contingency for both operating and capital costs. e) Environmental compliance and permitting requirements have been assessed in detail with supporting baseline studies and relevant preliminary internal impact assessments completed. Detailed tailings disposal, waste disposal, reclamation, and mine closure plans are incorporated into the life of mine plan. f) The life of mine plan, in toto, is completed to a minimum pre-feasibility level of study, although certain components of the plan have been completed to a feasibility level of study. 12.2 Mineral reserve estimation criteria 12.2.1 Recent production performance The recent production performance of Gruyere is summarised in Table 12.2.1.
P a g e 7 6 | 1 3 8 Table 12.2.1: Gruyere – recent production performance Units 2021 2020 2019 Total mined kt 39,406 26,447 19,850 Open pit waste mined kt 29,103 18,359 13,161 Open pit ore mined kt 10,303 8,088 6,761 Mined grade g/t 0.95 1.09 0.87 Strip ratio (tonnes) waste:ore 2.8 2.3 1.9 Tonnes treated kt 8,439 8,108 3,278 Head grade g/t Au 1.01 1.06 1.05 Plant recovery factor % 90.5 92.6 93.3 Total gold production koz 247 258 99 kg 7,668 8,030 3,082 Notes: a) The operating statistics are based on fiscal year measurements and are 100 % not Attributable 50 % Source: Gruyere CPR, 2021 12.2.2 Key assumptions and parameters The assumptions and parameters considered in the Mineral reserve estimate are summarised in Table 12.2.2. Table 12.2.2: Gruyere – key modifying factors Modifying factors Units 2021 2020 2019 Mineral resource modifying factors Mineral resource gold price $/oz 1,500 1,500 1,400 $/A$ 0.75 0.75 0.75 A$/oz 2,000 2,000 1,850 Cut-off for mill feed (fresh) g/t Au 0.48 0.35 -0.50 0.37 Cut-off for open pit g/t Au 0.41 – 0.58 0.35 -0.50 0.30 – 0.53 Mineral reserve modifying factors Mineral reserve gold price S$/oz 1,300 1,300 1,200 $/A$ 0.74 0.74 0.75 A$/oz 1,750 1,750 1,600 Cut-off for oxide ore g/t Au 0.61 - 0.92 0.30 - 0.50 0.30 - 0.49 Cut-off for transitional ore g/t Au 0.63 - 0.95 0.38 - 0.50 0.30 - 0.57 Cut-off for fresh ore g/t Au 0.65 - 0.96 0.42 - 0.50 0.30 - 0.70 Cut-off for mill feed open pit g/t Au 0.45 - 0.66 0.40 - 0.60 0.30 - 0.70 Mining recovery factor (open pit) % 88 - 98 94 - 98 94 - 98 MCF % 100 100 100 Dilution open pit % 4 - 31 7 - 20 7 – 20 Plant recovery factor % 81 - 95 88 - 91 86 - 91 Processing capacity Mt/a 10.0 9.4 8.2 Notes: a) The 2021 fiscal modifying factors are valid as at 31 December 2021 and are considered when estimate the Mineral reserves and resources b) The metal prices selected remained the same for the past two reserve and resource estimates c) The Qualified person is of the opinion that the modifying factors are adequate for Mineral reserve reporting and that the modifying factors are reported in ranges and vary based on open pit and underground extraction and estimated unit costs for depth and distance hauled d) The Qualified person is of the opinion that the modifying factors estimated minimize estimation errors Source: Gruyere CPR, 2021 Operating expenditures comprise: Cash Cost Components: these include direct mining costs, direct processing costs, direct G&A (general and administration) costs, consulting fees, management fees, transportation and realization charges.
P a g e 7 7 | 1 3 8 Total Cash Costs: these include additional components such as royalties (excluding taxes where appropriate). Total Working Costs: these include terminal separation liabilities, reclamation and mine closure costs (the net difference between the total environmental liability and the current trust fund provision) but exclude the salvage value on closure and non-cash items such as depreciation and amortization. Total Costs: these include total working costs plus net movement in working capital plus capital expenditure. Major Capital Projects: In addition to long-term capital projects, the life of mine capital expenditure programs generally include detail based on approved expenditure programs. The decision on whether to include or exclude potential mining areas is based on a detailed review, which includes: Economic viability Technical justification Ability to mine the area Health and safety considerations Infrastructure availability or constraints Environmental and social impacts Consistency with operational strategic plan Scheduling and timing of mining Time-based economic evaluation Mining costs are open pit mining costs and surface sources costs, including ore handling costs. Mining costs are based on contracted and unit rates for the preceding 6-to-12-month actual snapshot, applied to the planned physicals, with alignment to the key cost centres driving the operating costs. Processing costs include tailings and waste disposal costs, as well as the cost of maintaining key on-mine infrastructure. G&A costs are largely based on the required and necessary technical and administrative support services required to sustain current and future mining production. In most instances these are assigned with fixed and variable cost components per tonne of ore within both the reserve estimation and corresponding financial models. Corporate costs are assigned as variable with ounces sold in the financial model. The terminal benefits liabilities are not included in overhead costs as per Company policy and directives. Rehabilitation and appropriate mine closure costs are included following completion of mining. Capital expenditure estimates beyond the next two years are based on pre-feasibility estimates for infrastructure and development requirements for individual projects, and unit-rate average historical costs where applicable. A pre- feasibility study has an estimated accuracy for operating and capital costs of ± 25 % with a contingency of no more than 15 %. Details of the forecast operating and capital expenditures are provided in Section 18. As disclosed in Section 11.1.10, Gold Fields conducts an annual review of metal prices for Mineral resource and Mineral reserve reporting to monitor any significant changes that would warrant re-calibrating the price deck for strategic, business or life of mine planning purposes. This review considers prevailing economic, commodity price and exchange rate trends, together with market consensus forecasts and Gold Fields’ strategy and expectations for the mine operations. The Mineral reserve gold price of $1,300/oz is detailed in particularity in Chapter 16 Marketing. The Qualified person is of the opinion that the gold price applied to the estimation of the Mineral reserves is reasonable and suitable for life of mine planning and is an appropriate reflection of recent historical trends and importantly
P a g e 7 8 | 1 3 8 provides a metal price that mitigates the risk of short to medium term price fluctuations with the potential to impact on the execution of the life of mine reserve plans. The gold price used provides a reasonable long-term delta to current spot prices and incorporates into the life of mine plan appropriate contingency to offset possible short term lower price cycles. For the operating mines, 6 to 18 month trailing average actual costs form the basis of the unit rates applied to the reserve financial model, with consideration for expected variations in operating and capital costs. This timeframe is selected based on alignment with recent business planning data. For new mines, costs are based on estimates from a range of recent sources and are deemed appropriate and representative by the Qualified person. The Mineral reserve estimates may be materially affected based on changes to the cost and price assumptions, in addition to changes in the modifying factors. The reserve is assessed at multiple scales, including individual stope or pit, level, orebody, mine, and operation. As such, the Qualified person is of the opinion that the reserve plan should be viewed as a consolidated entity, as removal of key components of the reserve may have a material and disproportionate impact on the overall value and viability of the plan. In addition to changes to modifying factors, additional data acquired into the future may materially impact the reserve estimate. Examples include, but are not limited to, acquisition of additional drilling data, changes to interpretation of the data, mining studies, internal and external approvals and operating strategies 12.2.3 Cut-off grades Open pit cut-off grades are influenced by the operating strategy, design and scheduling, and are therefore calculated annually. No underground Mineral reserves have been declared for Gruyere. The cut-off grades used for the open pit Mineral reserves are calculated using the same methodology described in Section 11.1.10 at the reserve gold price of $1,300/oz. The cut-off grades by deposit are summarised in Table 12.2.3. Table 12.2.3: Gruyere open pit reserve cut-off grades Area Reserve shell revenue factor selected Reserve cut-off grade (g/t Au) RoM Expected process recovery (%) Gruyere RF0.9 0.61 91.3 % RF0.9 0.63 91.3 % RF0.9 0.65 91.3 % Alaric RF1 0.50 87.8 % RF1 0.56 87.8 % RF1 0.63 87.8 % Argos RF1 0.50 87.8 % RF1 0.53 87.8 % RF1 0.58 87.8 % Montagne RF1 0.51 87.8 % RF1 0.53 87.8 % RF1 0.62 87.8 % Attila RF1 0.55 87.8 % RF1 0.58 87.8 % RF1 0.59 87.8 % Notes: a) The cut-offs are estimated based on the reserve price, reserve modifying factors and are not expected to change materially over the life of mine reserve b) The cut-off grades, price and modifying factors are incorporated in the estimation of the reserve shell c) The Qualified person is of the opinion that the detailed design of the selected reserve shells that are incorporated into the reserve estimation minimize estimation errors Source: Gruyere COG Report, 2021
P a g e 7 9 | 1 3 8 12.2.4 Mine design and planning The mine designs are based on 3D block models representing in-situ mineralisation (inventory models), with allowances made for minimum mining widths, dilution and ore loss appropriate to the mining method being considered and geotechnical parameters. Historical performance measures are also considered in the determination of these modifying factors. Infrastructure, waste disposal, ore stockpile management and on-going rehabilitation requirements are incorporated into the planning process. Cut-off grades are applied to define potentially economic mining panels based on direct mining and/or processing costs, commodity prices and other parameters. The economic viability of the mining panels is tested by determining whether the margin above cut-off is sufficient to cover the required operating costs and provide a return on investment. Provided that individual mining areas cover the direct mining costs (capital and operating), variable processing, waste storage, rehabilitation and on-site administration costs, and contribute to overhead fixed costs, the material is included in the Mineral reserve assessment. From this, a mining schedule is generated and a time-based economic evaluation is undertaken to ensure the mine remains economic up until completion of mining, at which point rehabilitation commences. Open pit planning entails the input of economic parameters and physical constraints into optimisation software to generate a series of nested pits, from which an optimal shell is selected. Detailed design is then undertaken to confirm the mineability of the optimised shell. The process is iterated until an acceptable level of correlation is achieved between the optimised shell and detailed design. Open pit mine design and scheduling is based on a 3D Mineral resource block models. The ore is placed into SMU mining shapes based on machine size and selectivity. The SMU’s are accumulated into ore dig plans. Gruyere open pit ore is predominantly directly fed into the process plant with small stockpiles created to allow for better blending requirements. The selected pit shells are enhanced to detailed waste strip with benches recovering ore above the reserve cut-off grade. The open pits are sequenced together to blend and optimise the tail of the Mineral reserve and maximise NPV. The open pits are mined by a single contractor. Quantities and efficiencies are optimised to enhance value across the open pits (Table 12.2.4). The access ramps are ideally placed to minimise ore loss below the ramp and to optimise haul strategy. Calculation of slope angles is undertaken using both kinematic analysis and limit equilibrium modelling using both semi- deterministic and probabilistic methods and based on assumed performance control by ubiquitous structure. Slope designs are compared with empirical performance information under varying slope and ground conditions to ensure slopes are not overly aggressive or conservative. The slope parameters are incorporated into the pit design. The Gruyere deposit is mined by open pit methods (conventional drill, blast, load and haul methods) utilising a contractor. The pit is designed to be mined in five stages over its current life. The Golden Highway deposits are also planned to be mined as open pits by conventional drill, blast, load and haul methods. Mining equipment efficiency data collated as part of the LoM planning process is summarised in Table 12.2.4. Table 12.2.4: Equipment availability, utilisation and productivity assumptions for LoM planning Parameter Units Value Notes Equipment Availability Excavators, (PC4000, Liebherr 9400) % 88 Based on calendar hours Excavators, (Komatsu PC1250) % 88 Dump Trucks, (Bucyrus MT4400, Komatsu 830E) % 85 Drills, (Atlas Copco D65, Epiroc DML, CAT 6250) % 88 Equipment Availability Excavators, (PC4000) % 70 Based on available hours Equipment Production Rate: Excavators, (PC4000, Liebherr 9400) bcm/hr 1100-1400 Small Drills (Atlas Copco D65) m/hr 15-30
P a g e 8 0 | 1 3 8 Large Drills (Epiroc DML, CAT 6250) m/hr 15-35 Equipment Production Rate: Bucyrus MT4400 Tonnes/Load 225 Komatsu 830E bcm/hr 300 Other Maximum Vertical Rate of Advance m/year 70 ROM rehandle % 55 Proportion of mined ore material rehandled Rain delays hr/year 480 Notes: Based on the contract for the supply of open pit mining services and industry benchmark figures for availability and utilization. Source: Gruyere CPR, 2021 12.2.5 Mining schedule The Gruyere Mineral reserve LoM plan comprises: The Gruyere open pit 2022 to 2029 The Atilla open pit 2027 to 2029 The Alaric open pit 2029 The Argos open pit 2029 The Montagne open pit 2027 and 2028 The remaining Stockpiles 2030 and 3031 The constraints applied to the mining schedule comprises: Total Movement – 56 Mt Ore Movement – 2022 9.25 Mt, 2023 9.5 Mt and 2024 onwards 10 Mt/a The company’s annual mine planning process is anchored by a corporate planning calendar that sets out the sequence of events to be followed that ensures a strong linkage between the strategic planning phase and the life of mine plan itself that defines the Mineral reserves. During the first half of the year the preferred strategic plan is confirmed and approved by the company Executive Committee. This provides guidance for required investment and business and operational planning to position the mine to deliver on the strategic intent for the property. The detailed two-year operational plan and budget is informed by financial parameters determined by the Executive Committee and is the anchor to the longer-term planning and equates to the first two years of the life of mine plan. The overall planning process schedules key work to be completed and stage gated before subsequent work can be continued and includes the metal prices, geology and estimation models, resource models, mine design, depletion schedules, environmental and social aspects, capital and operating costs and finally the cash flow model and financial valuation. Capital planning is formalized pursuant to Gold Fields’ capital investment and approvals process. Projects are categorized and reviewed in terms of total expenditure, return on investment, net present value (NPV) and impact on All-in Costs (AIC) per ounce and all projects involving amounts exceeding $40 million are submitted to the Board for approval. Material changes to the plans are referred back to the Executive Committee and the Board. Post- investment reviews are conducted to assess the effectiveness of the capital approvals process and to leverage continuous improvement opportunities going forward. The Mineral reserve estimates are based on an appropriately detailed and engineered life of mine plan that is supported by relevant studies completed to a minimum PFS level of work. All design and scheduling is completed by experienced engineers using appropriate mine planning software and incorporates all relevant modifying factors, the use of cut-off grades and the results from other techno-economic investigations. Mining rates, fleet productivities and all key operational and plant capacities and constraints are accounted for in the plan and are typically based on historical
P a g e 8 1 | 1 3 8 performance trends. All geotechnical protocols and constraints are accounted for in the plan, including the provision for suitable mining geometries and ground support, mining losses in pillars, mining recovery and dilution. The provision of sufficient waste storage and tailings capacity is engineered into the plans to meet the life of mine requirements. Mine planning is driven primarily by personnel at the mine who are best positioned to determine the technical and commercial objectives for the site based on the parameters, objectives and guidelines issued by the corporate office. The site-based planning is supported by regional technical services functions, as well as from corporate technical services (CTS) and the corporate finance and sustainable development teams which provide overall oversight and assurance. Open pit Open pit mine design and scheduling is based on 3D Mineral resource block models. The ore is assigned to selective mining unit SMU mining shapes based on equipment size and practical selectivity. The selective mining unit SMUs are accumulated into ore dig plans. The selected pit shells are subjected to detailed mine design and extraction sequencing to optimize the waste: ore strip ratio and with benches recovering ore above the reserve cut-off grade. The access ramps are ideally placed to minimize ore loss below the ramp and can be outside the selected shell. The open pits are sequenced to derive the best possible integrated plan and to blend feed to the plant to assist with life of mine tail end management. The open pits are mined by a single contractor. 12.2.6 Processing schedule The processing schedule is derived from the Mineral reserve schedule. The ore is blended from the various open pit areas with individual ore type recovery formulas as detailed in Section 10.2 aggregated into an overall processing recovery. Refer to Section 19.1 for details on the LoM processing schedule. 12.2.7 Classification criteria Mineral reserves are classified as either proven or probable in accordance with the definitions in Subpart 229.1300 of Regulation S-K. Mineral reserve statements include only measured and indicated Mineral resources modified to produce Mineral reserves contained in the LoM plan. Gruyere Mineral reserves are based on detailed economical calculations of individual candidate reserve blocks. The differing mining methods all have assigned minimum mining dimensions (planned dilution) and unit mining costs. A proven reserve is assigned if it is flagged as a measured resource, the reserve block is covered by enough infill drill holes and/or exposed face mapping. A probable reserve is assigned if it is flagged as an indicated resource, is only covered by wide spaced exploration drill holes and has no face mapping. Other criteria for the declaration of Mineral reserves include: RoM grades and tonnages are reported as delivered to the processing facility and are therefore fully diluted. Only measured and indicated Mineral resources modified to produce Mineral reserves are contained in the LoM plan. 12.2.8 Economic assessment The basis for establishing economic viability is discussed in Section 19.
P a g e 8 2 | 1 3 8 12.3 Mineral reserves as of 31 December 2021 The Gruyere Mineral reserves as of 31 December 2021 are summarised in Table 12.3.1. The Mineral reserves are 50 % attributable to Gold Fields and are net of production depletion up to 31 December 2021. The point of reference for the Mineral reserves is ore delivered to the processing facility. Table 12.3.1: Gruyere - summary of gold Mineral reserves at the end of the fiscal year ended 31 December 2021 based on a gold price of $1,300/oz Amount/ (kt) Grades/ (g/t Au) Amount/ (koz Au) Cut-off grades/ (g/t Au) Metallurgical recovery/ (%) Open Pit Mineral reserves OP proven Mineral reserves 5,706 1.2 217 0.4 to 0.7 81 to 95 OP probable Mineral reserves 46,176 1.3 1,946 0.4 to 0.7 81 to 95 OP total Mineral reserves 51,881 1.3 2,163 0.4 to 0.7 81 to 95 Stockpile Mineral reserves SP proven Mineral reserves 2,667 0.73 63 81 to 95 SP probable Mineral reserves SP total Mineral reserves 2,667 0.73 63 81 to 95 Total Mineral reserves Total proven Mineral reserves 8,372 1.0 280 0.4 to 0.7 81 to 95 Total probable Mineral reserves 46,176 1.3 1,946 0.4 to 0.7 81 to 95 Total Gruyere Mineral reserves 2021 54,548 1.3 2,226 0.4 to 0.7 81 to 95 Total Gruyere Mineral reserves 2020 43,425 1.2 1,738 Year on year difference (%) 26% 2% 28% Notes: a) Rounding of figures may result in minor computational discrepancies. b) Refer to c) Table 12.5.1 for year on year for a detailed Mineral reserve comparison d) Quoted as mill delivered metric tonnes and run-of-mine (RoM) grades, inclusive of all mining dilutions and gold losses except mill recovery. Metallurgical recovery factors have not been applied to the reserve figures. The approximate metallurgical recovery factor is 81 % to 95 %. The metallurgical recovery is the ratio, expressed as a percentage, of the mass of the specific mineral product recovered from ore treated at the process plant to its total specific mineral content before treatment. The recoveries for Gruyere vary according to the mix of the source material (e.g. oxide, transitional fresh and ore type blend) and method of treatment. e) The metal prices used for the 2021 LoM Mineral reserves are based on a gold price of $1,300 per ounce or A$1,750 per ounce (at an exchange rate of A$1:$0.74). Open pit Mineral reserves at Gruyere are based on optimized pits and the underground operations on appropriate mine design and extraction schedules. The gold price used for Mineral reserves is detailed in particularity in chapter 16 Marketing. f) Dilution relates to planned and unplanned waste and/or low-grade material being mined and delivered to the process plant. Ranges are given for those operations that have multiple orebody styles and mining methodologies. The mine dilution factors are 4 % to 31 % (open pit). g) The mining recovery factor relates to the proportion or percentage of ore mined from the defined orebody at the gold price used for the declaration of Mineral reserves. This percentage will vary from mining area to mining area and reflects planned and scheduled reserves against actual tonnes, grade and metal mined, with all modifying factors, mining constraints and pillar discounts applied. The mining recovery factors are 89 % to 98 %. h) The cut-off grade may vary per shaft, open pit or underground mine, depending on the respective costs, depletion schedule, ore type, expected mining dilution and expected mining recovery. The average or range of cut-off grade values applied in the planning process are: Gruyere 0.4 g/t to 0.7 g/t Au. i) An ounces-based Mine Call Factor (metal called for over metal accounted for) determined primarily on historic performance but also on realistic planned improvements where appropriate is applied to the Mineral reserves. A Mine Call Factor of 100 % has been applied at Gruyere. j) The Mineral reserves are estimated at a point in time and can be affected by changes in the gold price, US Dollar currency exchange rates, permitting, legislation, costs and operating parameters. k) Gruyere is 50 % attributable to Gold Fields and is entitled to mine all declared material located within the properties mineral leases and all necessary statutory mining authorizations and permits are in place or have reasonable expectation of being granted. l) Increases in Mineral reserves at Gruyere are primarily due to increases in the designed pit wall angles following a feasibility study in 2021 resulting in additional Resource to Reserve conversion. Source: Gruyere CPR, 2021 The Gruyere Mineral reserves are the economically mineable part of the measured and indicated Mineral resources based on LoM schedules and pre-feasibility studies completed at the reserve gold price of $1,300/oz to justify their economic viability at 31 December 2021 (refer to Section 19 for details on the supporting economic analysis).
P a g e 8 3 | 1 3 8 12.4 Audits and reviews Audits and reviews completed at Gruyere during 2021 included: Site based internal peer reviews, validation and reconciliation of geology models, wireframes, estimates process and outputs with senior staff and department heads. Ongoing routine integrated routines drilling, sampling, geology audits, reviews and coaching of all staff by department heads to ensure due process and SOX compliance. Corporate technical audits and reviews of geology, estimation and mine planning models. Group technical team reviews and site visits for validation and compliance evaluation of Mineral resources and reserves process, detail and output. Critical Hazard Standard (CHS) - internal ISO14001 surveillance audit by recognised external auditors for recertification. TSF annual geotechnical audit - internal and external. Global Reporting Initiative – KPMG. Ongoing routine internal audits. Annual external financial audits – KPMG. Internal legal compliance and ethics policy review. Internal SOX compliance. Internal Management Operating Systems audit. International cyanide code audit. External End of Month process audit – KPMG. External audit of 2020 Mineral resources and reserves by Golder Associates. No adverse findings were recorded from any of the audits with minor improvement adjustments and best practice continuing to be implemented. Records of all audits are filed electronically on-site in relevant folders with major audit signoffs reported in the Gold Fields annual report. The audit by Golder Associates identified no fatal flaws in the Mineral resource and Mineral reserves reported by the Gruyere operation for 2020. 12.5 Comparison with 31 December 2020 Mineral reserve The net difference in Mineral reserves between 31 December 2020 and 31 December 2021 is +448 koz or +28 % (Table 12.5.1).
P a g e 8 4 | 1 3 8 Table 12.5.1: Net difference in Mineral reserves between 31 December 2020 and 31 December 2021 Proved and Probable Reserve Unit % Change Gold on RoM As at 31 December 2020 koz 1,738 Depletion 2021 koz -9 % -157 Gold price koz 0 Cost koz -1 % -18 Discovery koz 0 Conversion koz 0 Inclusion / exclusion koz +38 % 664 As at 31 December 2021 koz +28 % 2,226 Notes: a) The Qualified person opinion the year on year reserve changes are not material. The increase in reserve was based on pit an optimization study b) Data from Reserve 2020 and Reserve 2021 Source: Gruyere CPR, 2021 A series of overlapping internal processes exist at Gold Fields to review and validate the modifying factors, input assumptions, cut-off grades, designs, schedules, economic evaluation, and other technical assessments. These reviews include site, regional and group technical assessments, internal audits, and trained Competent Person / Qualified person authorizations. Multiple external audits of the Gold Fields Reserves declarations and processes for Gruyere have been completed within the past 5 years. These processes are designed to reduce the likelihood of a significant or material error in the Reserves estimation process and associated reserves declaration, although potential for error exists. The Qualified person for Reserves is not aware of any material error or omission that at the time of writing would be deemed likely to have a significant impact on the operation’s ability to deliver the reserve mine plan.
P a g e 8 5 | 1 3 8 13 Mining methods 13.1 Mining methods open pits The Gruyere deposit is mined by open pit methods utilising conventional drill, blast, load and haul activities. The pit is designed to be mined in five stages over the LoM. The mining methods include: Drilling and blasting of ore, associated internal waste and bulk waste outside of the ore envelope on 10 m benches. Trim blasts and pre-splits are used to provide wall control in fresh rock as required. The majority of explosives usage is bulk emulsion and the remainder is ANFO. Loading and hauling utilising excavators and 225 t haul trucks mining on 3 m to 4 m high flitches. Ore is marked out by paint or tapes on the ground, supported by dedicated ore spotters as required. Ore is direct fed to the crusher or placed on stockpiles for future rehandle as required. Waste dumps are developed in 10 m lifts and progressively rehabilitated. TSF embankment raises are constructed with waste material from the mine as required. Ancillary plant support for floor control, haul road construction and maintenance, rehabilitation, drill support, waste dump battering are provided by a fleet of dozers, graders and water carts. Pit dewatering is minimal and is managed by the collection of water from in-pit sumps for use in the mining operation. Crusher feed is provided by a combination of direct tip from the mine (45 % of crusher feed) and rehandle from RoM or long-term stockpiles using either a front-end loader only or a front-end loader and 135 t capacity haul trucks (dependent on the haul distance). RC grade control drilling services to a 25 m by 25 m pattern are provided either by the mining contractor or an externally contracted drilling company. The mining equipment fleet for years 1 to 5 as summarised in Table 13.1.1 is managed and maintained by the contractor. Table 13.1.1: Mining equipment major fleet numbers Equipment type Units Drills CAT 6250 1 Atlas Copco D65 3 Epiroc DML 3 Excavators Komatsu PC4000 1 Komatsu PC1250 1 Liebherr 9400 2 Haul trucks Bucyrus MT4400 5 Komatsu 830E 5 Ancillary Plant Caterpillar D10T (Dozer) 3 Caterpillar 16M (Grader) 1 Komatsu WA900 (Front-end loader) 1 Caterpillar 785C (Water cart) 1 Source: Gruyere CPR, 2021 Gruyere Mine equipment and personnel is based on the contract for the supply of open pit mining services. The Qualified person considered the following factors when selecting the open pit mining method: a) The geotechnical and rock behaviour models, see Section 7.4 for detail
P a g e 8 6 | 1 3 8 b) The hydrological surveys as described in Section 7.3 c) The open pits are supplementary to the underground and are completed within twelve months of commencing d) The modifying factors including strip ratios as stated in Table 12.2.1 and the open pit cut-off grades as stated in Table 12.3.1 e) The mining fleet configuration and equipment specifications as stated in f) Practical mining rates, selective mining unit dimensions, mining dilution and mining recovery.
P a g e 8 7 | 1 3 8 Figure 13.1.1:Final Reserve outlines Gruyere open pit life of mine Reserve final outline
P a g e 8 8 | 1 3 8 Source: Gruyere CPR 2021 13.2 Geotechnical models An independent external party (Dempers and Seymour 2016) was commissioned to undertake the pit slope design analysis for the Gruyere open pit as part of the 2016 feasibility study. The scope of work for the analysis included DD drilling, geotechnical and structural logging of drill core, laboratory test-work of selected drill core samples, structural modelling of significant geotechnical features, 3D rock mass modelling utilising the Mining Rock Mass Rating system, kinematic structural analysis, probabilistic and deterministic structural analyses, probabilistic and deterministic limit equilibrium analyses. The analysis considered data from 34 representative geotechnical drill holes, optical and televiewer surveys completed on 139 drill holes and core photos from 111 drill holes. Further analysis and a geotechnical report (Gruyere Open Pit Wall Optimisation Study) was completed in 2021 for the Gruyere Pit Expansion Pre-Feasibility Study. The geotechnical information collected in 2019 and 2020 from additional field programmes including diamond drilling with 15 dedicated geotechnical boreholes, logging of orientated core, geotechnical mapping, and ground water measurement, enabled a comparison to occur on the previously collected dataset.
P a g e 8 9 | 1 3 8 The following geotechnical constraints and design practices apply at Gruyere: 13.2.1 Regional Stability The regional stability of the mine was reviewed using numerical modelling software. The geotechnical environment at Gruyere is defined by seven main rock units, namely, oxide, transition, intermediate volcanic, tonalite, basalt, intermediate volcaniclastic and an interpreted fault zone. A 3D Mining Rock Mass Model (MRMM) was developed based on geological lithological models and geotechnical logging of drill core. Detailed pit slope analysis of the MRMM resulted in the definition of 11 geotechnical domains and their respective batter and berm configurations. Pit slope berm and batter configurations are designed within the guidelines published by the DMIRS. Overall pit slopes are designed to achieve a minimum Factor of Safety of 1.2. in accordance to the Gold Fields acceptance criteria (Read and Stacey 2009) as summarised in Table 13.2.1 below. The rock mass at Gruyere is classified as fair to good. The results of the analysis indicated that geotechnical conditions at Gruyere are consistent with the general conditions in the Eastern Goldfields region of Western Australia. Table 13.2.1: Gold Fields acceptance criteria for open pit design inclusive of typical factor of safety and probability of failure Slope scale Consequence of Failure Acceptance Criteria FoS (min) (static) FoS (min) (dynamic) PoF (max) P[FoS≤1] Bench Low-High 1.1 NA 25 -50 % Inter-ramp Low 1.15 – 1.2 1.0 25 % Moderate 1.2 1.0 20 % High 1.2 – 1.3 1.1 10 % Overall Low 1.2 -1.3 1.0 15 -20 % Moderate 1.3 1.05 10 % High 1.3 – 1.5 1.1 5 % Source: Gruyere CPR 2021 13.2.2 Infrastructure Long term infrastructure, including waste rock landforms, the RoM pad and the TSF, are designed to be located outside the zone of potential geotechnical wall failure. This zone of potential failure is determined by applying the Western Australian Department of Mines, Industry, Regulation and Safety guidelines. 13.3 Hydrogeological models Hydrological and hydrogeological studies were completed for Gruyere as part of the 2016 feasibility study. The study was prepared by an external independent group (Pennington Scott 2016; 2088: Rev 0). Study parameters were derived from desktop and field observations including feedback from drilling and geological and geotechnical logging. The key outcomes of the study were: The major water inflow to the Gruyere open pit is likely to be at the base of the weathered zone. The rate of dewatering abstraction is anticipated to peak at approximately 30 L/s in the initial years of mining, declining to 20 L/s towards the end of the LoM. The in-situ fresh rock is likely to have much lower water storage capability and hence resulting inflows will be low. Dewatering is by ex-pit bores, in-pit sumps and horizontal seep wells. Flow rates into pit sumps from groundwater are estimated in the range of 9 L/s to 22 L/s.
P a g e 9 0 | 1 3 8 No major issues were identified in this report which could impact on mining Gruyere. A further Mine Water review was completed by Pando (Australia) Pty Ltd (May 2020) for the Pit Expansion Pre-Feasibility Study. This report indicated that rock mass seepage was localised and generally low flow, in association with fault or shear structures and foliation/bedding observed in the west wall of Stage 1 pit. Studies on the vibrating wire piezometer readings has indicated that the groundwater is potentially recharged by steep foliation and vertically draining into the rock formation. The saprolite developed from the volcaniclastic has been observed to be a low permeability, fine grained soil of low strength and poor drainage characteristics. The steep easterly dipping foliation/bedding is likely to result in anisotropic permeability with maximum permeability oriented parallel to the bedding/foliation. This characteristic tends to inhibit drainage towards the pit. The Qualified person’s opinion is that all appropriate geotechnical and hydrogeological parameters have been suitably considered and risk assessed to support the mining method selection and extraction sequencing and this information is embedded in Gruyere’s Ground Control Management Plan which is routinely updated as new empirical information becomes available. The mine plan is geotechnically robust from a local and regional stability perspective.
P a g e 9 1 | 1 3 8 14 Processing and recovery methods 14.1 Flow sheet and design Test-work on the physical and gravity/leach recovery properties of the Gruyere orebody were completed as part of the pre-feasibility study and the 2016 feasibility study and utilised to design the processing facility with capabilities suited to process the required ore from the deposit. Processing of ore commenced in 2019 with first gold produced in the second quarter of 2019. The process plant was designed to treat 7.5 Mtpa of fresh ore. Plans are in progress to further increase the capacity to a target of 10 Mtpa in 2025. The current processing facility consists of a primary crushing circuit, a semi-autogenous ball mill crusher (SABC) grinding circuit, leach feed and tailings thickeners and a standard CIL circuit. RoM ore is trucked and direct tipped into a primary gyratory crusher or stockpiled on the RoM pad before processing. Ore from the future Golden Highway deposits will be transported to the process plant and blended with Gruyere ore. Discharge from the primary crusher is transferred via conveyors onto a coarse ore stockpile (COS). The COS capacity is approximately 75,000 tonnes. Apron feeders under the COS stockpile reclaim and transfer crushed ore to the SAG mill feed conveyor which feeds the two-stage grinding circuit. The first stage is a grate discharge SAG mill in open circuit (with closed circuit pebble crushing) and the second stage is an overflow discharge ball mill in closed circuit. Each grinding mill is installed with 15,000 kW motors. This is followed by a gravity concentration circuit and in-line leach reactor and a hybrid CIL recovery circuit, consisting of 1 leach tank, 6 adsorption tanks and an elution circuit (consisting of carbon acid washing, cyanide elution, higher temperature regeneration). The gold in pregnant solution from the intensive leaching and elution circuit is recovered via electrowinning in the gold room. The recovered gold is smelted in a furnace to produce the final gold product (doré bars). Gold bars are poured from sludge from both the gravity and CIL electrowinning circuits. Gold is refined on-site to crude doré at 75- 90 % gold purity. Doré is dispatched to the Perth Mint refinery for further processing. A schematic process flow sheet for the process plant is shown in Figure 14.1.1.
P a g e 9 2 | 1 3 8 Figure 14.1.1: Schematic flow diagram of the Gruyere process plant Source: Gruyere CPR, 2021 Standard practice at the process plant ensures that all spillages are captured within bunds and hosed into sumps for return into the process. There are two main areas for gold to collect outside of the electrowinning/smelting and tailings streams: the gold room sump and mill liners. The gold room sump is cleaned monthly while the mill liners are pressure cleaned back into the circuit when removed from service following a reline. 14.2 Recent process plant performance The recent performance of the Gruyere process plant is provided in Table 12.2.1. The Gruyere reserve life of mine assumes that the production rate of the mill will be progressively increased to 10 Mtpa. Higher mill throughputs typically result in a reduction in unit processing operating cost. However, since the plant has only relatively recently been commissioned (2019), it has not yet been optimised as typically would occur during the life of a typical mineral processing plant. As such the plant has not demonstrated the ability to achieve in the longer term, the assumed 10 Mtpa throughput rate. Campaign trials of milling 100 % fresh ore undertaken in 2021 has shown that instantaneous mill throughput rates of 1,200 tpoh can be sustained. Comminution circuit power modelling indicates the potential to achieve 1,260 tpoh with the available power of the installed mills. However, to achieve 10 Mtpa at these levels of instantaneous throughput rates would require a mill time of 91 % to 95 % to be achieved for the operating year, which is higher than that which Gruyere has achieved since commissioning in 2019 on a longer-term basis.
P a g e 9 3 | 1 3 8 The following activities are in evaluation, planned or in progress to progressively achieve the 10 Mtpa production rate (noting this is not an exhaustive listing): Open pit blasting fragmentation optimisation Pebble crushing circuit upgrade Mill liner material optimisation for wear life (white iron liners) Optimisation of primary crusher and pebble crusher liners for wear life Optimisation of SAG mill discharge end grates and pulpies configuration Optimisation of the ball mill grinding balls top size selection and volume Optimisation of the hydrocyclones and classification circuit process control Maintenance and engineering modification program to improve high-wearing chutes, pipes, etc Re-evaluation of economically optimum final milling circuit grind size target 14.3 Process plant requirements The key process plant requirements for the first five years of the Mineral reserve LoM plan are summarised in Table 14.3.1. These consumables quantities have been estimated using guidance from the 2022 Budget LoM, prorated based on plant feed mass. The number of plant employees required is in the range of 55 to 65. Table 14.3.1: Process plant – key requirements summary Sources Units 2022 2023 2024 2025 2026 2027 2028 Ore Processed kt 9,262 9,500 10,000 10,000 10,000 10,000 10,000 Plant Power draw MWhr 271 278 293 293 293 293 293 Grinding Media t 12,411 12,730 13,400 13,400 13,400 13,400 13,400 Lime t 16,672 17,101 18,001 18,001 18,001 18,001 18,001 Sodium Cyanide t 2,100 2,154 2,268 2,268 2,268 2,268 2,268 Caustic t 227 233 245 245 245 245 245 Activated Carbon t 138 142 149 149 149 149 149 Hydrochloric Acid t 1,111 1,140 1,200 1,200 1,200 1,200 1,200 Source: Gruyere CPR 2021 14.4 Processing Risks 14.4.1 Major Equipment Failure Industrial mineral processing plants consist of a series of dedicated unit processes, e.g., crushing, grinding, CIL, and carbon elution. There is inherent risk associated with catastrophic failure of one (or more) of the key equipment items associated with these unit processes, whereby such failure could lead to a significant period of plant downtime until repairs are completed, resulting in the inability of the processing plan to be achieved and/or higher operational costs incurred than anticipated. Catastrophic failures could be associated with the structural, mechanical, or electrical components of the key processing equipment items. Key equipment items could include the crushers, grinding mills, or CIL tanks. Risk minimisation activities to reduce the likelihood of such occurrences adopted by Gruyere includes: Dedicated on-site maintenance department which undertakes condition monitoring activities, preventative maintenance, and repairs
P a g e 9 4 | 1 3 8 Critical spares (e.g., spare mill motors, bearings, and gearboxes) Contingency operational plans (e.g., engage a contract/mobile crushing plant, CIL tank by-passing) Fire suppression systems Insurances Decisions associated with asset management, critical spares, insurances, etc. are outside the responsibility and accountability of the Qualified person, and that some inherent risk and uncertainty associated with catastrophic failure of processing equipment remains. 14.4.2 Plant Operational Management The processing facilities are managed and operated by dedicated teams of personnel, who are required to make many operational and maintenance decisions every day. These decisions can directly impact the performance of the plant while processing the future ore reserves. For example, a decision to process ores at a higher throughput could result in a coarser grind size from the grinding circuit, resulting in a lowering of the plant recoveries. Similarly, the choice to operate the leaching circuit at lower free cyanide or dissolved oxygen concentrations to reduce consumables usage rates, could result in lower plant recoveries being achieved than anticipated. It needs to be recognised that plant management and the associated decisions made by plant operating personnel, are outside the responsibility and accountability of the Qualified person, and that such decisions and actions taken by plant management can influence the achieved performance of the plant (e.g., throughput, costs, availability, and recoveries). 14.4.3 Operating Costs, Plant Consumables and Reagents The operating cost of the processing plant represents a significant cost element to the overall financial evaluation of the reserve’s life of mine plan. The processing facilities use relatively large quantities of power, reagents, and consumables, including fuels, cyanide, grinding steel media, lime, caustic, etc. The estimation of future processing costs is required as input into the cut-off-grade calculations and economic assessments of the reserves and resources. To estimate the processing costs, require assumptions to be made concerning consumables consumption rates, unit prices and inflation rates. Metallurgical testing undertaken on the future reserves, and recent plant performance, provides reasonable guidance of potential reagent consumption rates and mill throughput expectations, and this information is considered and reviewed by the plant metallurgist and the Qualified person. Gruyere, like many other operating gold processing plants that have a reasonable operating history, do not allow for a discreet operating cost contingency in their future operating cost forecast. The absence of contingency is considered by the Qualified person as being a common and reasonable approach to operational process plant cost forecasting. Consumables, commodity pricing and inflation are subject to external influences that are outside the control or predictive capability of the Qualified person. Further to this, operational decisions made by plant management, or unexpected variances in the nature of the ores being processed could unexpectedly impact reagent and consumables usage rates. Such variances are outside the control or predictive expectations of the Qualified person. The achievement of the reserve life of mine assumed unit process costs relies on the ability to achieve and sustain 10 Mtpa processing rates from 2025 onwards. 14.4.4 Mill throughput The limited operating experience of the Gruyere plant, commissioned recent in 2019, means that operating sustainably at 10 Mtpa on predominantly fresh ore, as assumed by the reserve life of mine plan, has not yet been demonstrated in practice.
P a g e 9 5 | 1 3 8 Theoretical assessments (industrially benchmarked) using the available measured ore hardness samples test results, by a few different practitioners, indicate that such a throughput is possible, and has also shown to be possible operationally on a short-term basis. Achieving 10 Mtpa requires operating the plant with a runtime of more than 92 %, which has not yet been demonstrated in the longer term. A work program is underway to improve both plant runtime and instantaneous throughput. As such, the risk of not achieving the target 10 Mtpa remains, until demonstration of this is shown in the longer term.
P a g e 9 6 | 1 3 8 15 Infrastructure Details on each major item of non-process infrastructure are discussed in this section. The site infrastructure layout is shown in Figure 4.4.1. 15.1 Tailings storage facilities (TSF) The TSF is located immediately north of the processing plant and east of the pit (Figure 15.1.1). The TSF was initially designed to receive 8.0 to 8.2 Mtpa of tailings for the first 3 years, followed by 7.5 Mtpa of tailings for the remaining 9.12 years. The Engineer of Record (EoR) for the TSF is SRK Consulting. Figure 15.1.1: Location of the TSF relative to the pit and processing plant Source: Gruyere CPR 2021 The existing circular TSF adopts a downstream construction method and is raised using material sourced from the nearby Pit. The original starter embankment (crest elevation of RL 412 m) will be raised in five increments (in Stages) to reach a final embankment crest elevation of RL 439.2 m. The current Stage 2 has a crest level of RL 417 m, corresponding to a maximum embankment height of 18.5 m. The Stage 2 embankment raise design and construction supervision were provided by Coffey (currently known as Tetra Tech Coffey). The Stage 2 raise construction commenced in March 2020 and was completed by mid-December 2020. The current Stage 3 raise construction commenced towards the end of this audit reporting period (end of June 2021) and is forecast to be complete by February 2022.
P a g e 9 7 | 1 3 8 The facility consists of a zoned perimeter embankment with liner and cut-off trench; a central decant structure with pump for water recovery, an accessway to the decant structure, liner and associated herringbone underdrainage system around the central decant tower and perimeter underdrains. Tailings are deposited via a series of spigots located on the perimeter embankment of the TSF. Subsequently, a rockfill blanket drain was constructed at the downstream toe of the perimeter embankment, directly adjacent to the internal underdrainage sump. The rockfill blanket drain was installed to intercept seepage at the downstream toe. The original design storage volume is approximately 62 Mm³, and the tonnage capacity is approximately 93 Mt (at a dry density of 1.5 t/m³). However, since the commissioning of the TSF in June 2019, the average tailings insitu density has been measured as 1.55 t/m³ (SRK 2021), yielding a total capacity of ~99.5 Mt. The life expectancy of the existing TSF is limited to approximately 2030, beyond which additional storage capacity is required to accommodate an estimated 28.5 Mt of tailings to meet the end of 2021 increase in reserve declaration. The total life of mine tailings storage requirement is 128 Mt. A PFS study has been completed for a new TSF to accommodate the additional 28.5 Mt. The Gruyere TSF must comply with the Global Industry Standard on Tailings Management (GISTM) in August 2025. A gap analysis has been completed, and the GISTM compliance program is underway in collaboration with the EoR. Table 15.1.1: Life of Mine Reserve TSF storage balance LoM deposition (Mt) Available capacity (Mt) Surplus/ (Shortfall) (Mt) Capital required (A$m) Expenditure period (years) 86.85 81.04 -5.81 66.81 9 Source: Gruyere CPR, 2021 15.2 Waste rock dumps The estimated mine waste volume from the presently optimised pit total is around 253.747 Mt of which about 56.6 % is anticipated to be fresh rock. The expected composition of mine waste material is summarised in Table 15.2.1. Table 15.2.1: Likely Composition of Mine Waste Material Waste Type Estimated Volume (kt) Estimated % of Mine Waste Transported Material 4,118 1.6 Permian (oxidised) 23,437 9.2 Saprolite (oxidised) 32,909 13.0 Saprock (oxidised) 33,746 13.3 Transitional 16,173 6.3 Fresh 143,363 56.6 Total 253,747 100.00 Source: Gruyere CPR, 2021 Waste rock from the pit will be disposed at designated waste rock dumps located adjacent to the pit as shown in Figure 15.1.1. Some waste rock will also be utilised to construct the ROM pad and walls of the TSF within the IWL. The Gruyere WRD will be sited as close to the pit as safely possible taking into account necessary width for infrastructure around the open pit and DMIRS guidelines on the construction of safety bund walls and WRD’s outside the long-term Zone of Instability (ZOI) around open pit mines. All Gruyere competent waste rock is considered benign (on the basis of waste rock characterisation studies completed during the feasibility study) and suitable for use as construction material for embankments, waste rock landforms and TSF closure cover materials, with very low risk of seepage adversely affecting existing groundwater quality. Mafic volcanic (basalt) waste is expected to be the most competent waste rock type and will be mined later in the project and
P a g e 9 8 | 1 3 8 will therefore be preferentially placed on outer waste rock dump batters as mine closure approaches. The depth of cover of competent waste rock will be no less than 5 m and will be governed by Gruyere Joint Venture mining and dumping schedule during operations. Some of the highly weathered saprolite and possibly saprock material may be less suitable for construction and landforms as clay-sized material present is potentially dispersive. Potentially dispersive material will be mined early in the project and will be managed appropriately through Gruyere Joint Venture mining and dumping schedule and site procedures during the operational phase, specifically designed for mine engineers and geologists who are directing ore and waste movements. As the waste rock is non-saline and geochemically benign, there should be no need for a capillary break layer or a thick ‘store and release’ soil cover to minimise ingress of water and oxygen. Waste rock dump height will be capped at a maximum of approximately 41 m above natural surface. The final dump embankments will be battered down to form a single continuous concave landform with a slope angle of approximately 17 degrees which is conventional/typical for the Goldfields region. Embankments will be constructed from fresh rock to prevent erosion with a thin layer of topsoil spread over the surface. A “minimum” amount of topsoil will be spread over the surface. “Minimum” is defined as ‘enough to fill in voids between the coarse rock cover. Excess sandy soil will easily erode and therefore it is not beneficial to place any more than a minimum over the surface. A cross section and materials balance is shown in Table 15.2.2 and Table 15.2.2 respectively. Table 15.2.2: Materials Balance for Fresh, Competent Rock (Mm3) Infrastructure Type Fresh, Competent Rock (million broken meters cubed) Available from Mining Required for Armouring at 5 m Thickness IWL 17,883,900 3.0 WRL 82,084,125 9.0 Abandonment Bunds 32,564 0.5 Total 100,000,589 12.5 Source: Gruyere CPR, 2021 Table 15.2.3 summarises the WRD design criteria which will be applied to the project. During operations, further trials and studies will be undertaken on physical characteristics of "as mined" materials to confirm the final landform design. A change of final slope angle from the approved 15 degrees to 17 degrees has been approved by DMIRS. Table 15.2.3: Waste Rock Dump Design Criteria for the Gruyere Gold Project Waste Rock Dump Design Criteria Units Value Final Slope Angle degrees(˚) 17 Maximum Dump Height Above Natural Surface m 41 Construction Berm Lifts m 10 - 20 Construction Slope (Angle of Repose) degrees(˚) 37 Source: Gruyere CPR, 2021 15.3 Water All water used at Gruyere is sourced from groundwater. The primary and largest use of groundwater is for the processing of ore, followed by dust suppression with a small proportion processed for potable water. Mine dewatering is reused for dust suppression and to supplement process water. Eight bores were commissioned at the Anne Beadell borefield which provides most of the water required for the accommodation village. Potable water is processed via a reverse osmosis (RO) plant and disinfected using ultra-violet light filtration systems. The Anne Beadell borefield is in a shallow paleochannel 23 km southeast of the mine site. Water extracted from the borefield is classed as brackish-saline water.
P a g e 9 9 | 1 3 8 A water supply of up to 20,500 kL/day was developed at the Yeo borefield for mineral processing and ancillary services such as dust suppression. The Yeo borefield is approximately 28 km west of the process plant and comprises northern and southern borefield branches. Water is also be recycled from the TSF and returned to the process plant. The Gruyere water management strategy will be continually improved to better utilise and conserve the groundwater resources at Gruyere and identify new water sources to enhance water security. Water use is minimised through return of TSF supernatant water and interception and recovery bores around the perimeter of the facility. Currently the water demand is only around 60 % of the water availability with the current Ground Water Licence sufficient to provide substantially more water. 15.4 Power On-site power is provided via a 198 km gas pipeline and a 53 MW gas-fired power station with a 3 MW of diesel backup. APA Group (APA) designed, built and own the pipeline and power station. During 2021, a 4 MW gas engine, a 13 MW solar farm and 4.4 MW/4.4 MWh battery storage system was installed. Natural gas is procured separately and supplied to APA for power generation. APA recovers its investment cost through a gas transportation and electricity supply agreement. The 2021 power supply expansion increased the mines contracted maximum demand (CMD) from 35 MW to 39 MW to enable the plant to operate at 10 Mtpa. This expansion included a spare generator bay in powerhouse three if more gas generation capacity is required in the future. Power consumption varies with ore type, with fresh rock, mine load peaks at 39 MW. Future demand of an estimated 300 kW for the pebble crusher upgrade will be absorbed within the existing power infrastructure. Gold Fields 2030 ESG targets include an additional 26 MW of solar and 9 MW of battery power capacity to meet the regional emissions target, providing further surplus generation capacity and reduce reliance on natural gas. The work to implement this solar and battery is yet to enter the study phase. Power reticulation throughout the plant is via 11 kV cable. From the plant to the TSF is via 11 kV overhead line and from the plant to the accommodation village and out to the Yeo borefield is via 22 kV overhead line. The Anne Beadell borefield has local diesel generation, in 2022 there is budget to augment this diesel with local solar power. 15.5 Accommodation The 648 room residential camp, offices and recreational facilities were completed in July 2017. Accommodation and messing services for the camp are provided by Compass Group. 15.6 Site access Mine site access is dual lane elevated truck compacted roadways constructed from mining waste material connect the surface infrastructure. These roads connect the operating mines, infrastructure and residential camp. Other infrastructure on site includes; Transport corridors Dams and turkey nests Fuel storage facilities Workshops and laydown areas Landfill Site Administration and training facilities Airstrip A Solar Farm Waste water treatment plant
P a g e 1 0 0 | 1 3 8 Vehicle wash down bays Bioremediation Pad Communication towers Pipeline corridors 15.7 Other infrastructure Gruyere has ancillary infrastructure to support mining. These include an airfield, workshops, mine offices, training centres, communications, medical and emergency response, maintenance, laboratory, core yard/sample storage, contractors’ yard, explosives compound, fuel and reagent storage, and sewage and renewable hybrid energy generation facilities. The Qualified person is of the opinion that the infrastructure for the Gruyere mining operation is fit for the life of mine reserve estimation and that the Mineral reserve quantities are tested against dump and disposal capacities.
P a g e 1 0 1 | 1 3 8 16 Market studies 16.1 Preliminary market study A review of metal prices for planning purposes is undertaken annually to monitor any significant changes in price trends or exchange rates that would warrant re-calibrating the price deck before the Strategic Planning process transitions into the Business Planning cycle. This review of the metal price deck has taken account of the prevailing economic, commodity price and exchange rate (Fx) trends, together with market consensus forecasts, in addition to consideration of the Gold Fields’ strategy and expectations for the operations. Our strategy is to (1) mitigate annual volatility by holding planning metal prices as long as warranted to support stability in mine planning, notably regarding the underground MSO and open pit shell selections; (2) maintain appropriate margins on spot and long-term price forecasts to support the Group’s BSC metrics; (3) protect against accelerating mining sector inflation and, (4) to confirm a separate gold price to be used specifically for the Operational Pan (budget) revenue streams and cash flows in Q3 each year. The outcome of the pricing analysis was to use a gold price of $1,300/oz for Mineral reserves and $1,500/oz for gold Mineral resources for the December 2021 disclosure of estimates. The relevant copper and silver prices in US Dollars are shown in the summary table below. Note the A$/oz and ZAR/kg gold prices applied to the estimates in Australia and South Africa are included for transparency. Table 16.1.1: Reserve and Resource metal prices Units December 2021 Metal price Deck Metal Unit Mineral reserve 31 Dec 2021 Mineral resource 31 Dec 2021 Gold US$/oz 1,300 1,500 A$/oz 1,750 2,000 ZAR/kg 650,000 750,000 Copper US$/lb. 2.8 3.2 Silver US$/oz 17.5 20.0 Source: Gruyere CPR, 2021 The above price deck comparison to market long-term forecasts assessed at the time of analysis is consistent with the Registrants approach to retaining good discipline in support of the Company strategy; this approach ensures Gold Fields’ Mineral resources and reserves are not too volatile year-on-year and that the company is protected against possible downside scenarios if the gold price falls up to ~25 % in any specific year. Ensuring sufficient flying height to maintain our margins at prices that could be incrementally lower than the spot price ranges seen in 2021 is also important. Equally, with annual mining sector inflation estimated at $30-40/oz, we need to ensure we mitigate this escalation risk in the life of mine plans and Mineral reserve estimates. Sensitivity analysis on gold price for project financial evaluation is done to provide flexibility/range analysis for all regional studies and site growth opportunities and investment purposes. The Mineral resource gold price premium to the Mineral reserve price is circa 15 % and the differential is in general alignment to our peer group and industry standard practice. The Mineral resource price premium is to provide information on each operation’s potential at higher gold prices and to indicate possible future site infrastructure and mining footprint requirements. All gold produced at Gruyere is refined by the Perth Mint in Western Australia. The Perth Mint applies competitive charges for the collection, transport and refining services. The Perth Mint takes responsibility for the unrefined gold at collection from the operation where it engages a sub-contractor, Brinks Australia. Brinks delivers the unrefined gold
P a g e 1 0 2 | 1 3 8 to the Perth Mint where it is refined, and the refined ounces of gold and silver are credited to the relevant metal accounts held by the operating company with the Perth Mint. The contractual arrangement with the Perth Mint continues until terminated by either party upon 90 days’ written notice. Gold Fields’ treasury department in the corporate office in Johannesburg, South Africa sells all the refined gold produced by the operating company. On collection of the unrefined gold from a mine site, the relevant operating company will notify Gold Fields’ treasury department of the estimated refined gold content, expressed in troy ounces, available for sale. After such confirmation, the treasury department sells the refined gold to authorised counterparties at a price benchmarked against the London Bullion Market Association PM gold auction price. All silver is sold to the Perth Mint at the London Bullion Market Association silver price on the last business day of each month. Gold Fields may periodically use commodity or derivative instruments to protect against low gold prices with respect to its production. Variations in gold price, currency fluctuations and world economics can potentially impact on the revenue received. No gold derivative instruments are in place at the date of this report. The majority of gold production is used for jewellery and for investment purposes, in the latter case because the market views it as a store of value against inflation. In addition, certain physical properties of gold, including its malleability, ductility, electric conductivity, resistance to corrosion and reflectivity, make it the metal of choice in a number of industrial and electronic applications. Supply of gold consists of new production from mining, the recycling of gold scrap and releases from existing stocks of bullion. Mine production represents the most important source of supply, typically comprising 75 per cent. each year. Annual demand requires more gold than is newly mined and the shortfall is made up from recycling. Management believes that long-term gold supply dynamics and global economy trends will support the gold price at levels above or aligned to $1,300 per ounce in the long-term. The market for gold is relatively liquid compared to other commodity markets, with London being the world’s largest gold trading market. Gold is also actively traded via futures and forward contracts. The price of gold has historically been significantly affected by macroeconomic factors, such as inflation, exchange rates, reserves policy and by global political and economic events, rather than simple supply/demand dynamics. Gold is often purchased as a store of value in periods of price inflation and weakening currency. The price of gold has historically been less volatile than that of most other commodities. Significant service contracts and/or leases that are in place to enable execution of the life of mine plan include: Perth Mint - Refining Maca – Mining & production Drilling Maca – Ore Haulage Coastal Midwest Transport - Freight haulage EDL – Power supply Civil Aviation Safety Authority – Flights ESS – Camp Services N – Exploration Drilling ALS Global – Assay Services The Qualified person has relied on information provided by the Company in preparing its findings and conclusions regarding market studies related to gold sales from Gruyere. Refining services are based on well-established long-term agreements and expediting gold sales over the life of the asset does not represent any significant uncertainty. Service contracts, lease agreements and goods contracts e.g., diesel, cyanide and cement, necessary to develop the property as planned, are in place and have the capability to support the full projected cash flow period.
P a g e 1 0 3 | 1 3 8 16.2 Metal Price history Gold prices London Metals Exchange afternoon close o Gold spot 30 December 2021 - $1,805.85/oz - A$2,484.32/oz o Fx 30 December 2021 A$1:$0727c o Gold spot 24 month average - $1,784.45/oz o Gold spot 36 month average - $1,653.71/oz o Gold spot 60 month average - $1,497.48/oz
P a g e 1 0 4 | 1 3 8 17 Environmental studies, permitting, and plans, negotiations, or agreements with local individuals or groups Climate change is an integral part of the Mineral reserve generation process and incorporating relevant costs associated with climate change, primarily decarbonisation, mitigation and adaptation to the changing climate, is a key theme for the Company. Integration of these key elements into the Mineral reserve process is being carried out progressively and simultaneously across all of Gold Fields’ sites. 17.1 Permitting Gruyere underwent formal environmental assessment by the Office of Environmental Protection Authority (OEPA) under Part IV of the Environmental Protection Act 1986 (EP Act). The management and protection of stygofauna (aquatic fauna that live in groundwater systems or aquifers) identified in the Yeo borefield area was the key environmental factor identified by OEPA that required formal impact assessment. Final project EPA Part IV approval was received on 29 December 2016. No Commonwealth environmental assessment was required under the Environment Protection and Biodiversity Conservation Act (EPBC Act). A Project Management Plan, Mining Proposal and Mine Closure Plan detailing information on the identification, evaluation and management of environmental impacts relevant to the mine and the surrounding environment was submitted to the Department of Mines, Industry Regulation and Safety (DMIRS) with approval granted in February 2017. In parallel with these proposals, Gruyere also received various works approvals and licences for construction and operations of prescribed premises under Part V of the EP Act. These approvals, from the Department of Water and Environmental Regulation (DWER) were also received in February 2017. The key operating environmental permits for the operation are issued by DMIRS and DWER and relate to: Mining proposal which includes land clearing, disturbance and infrastructure Environmental licence Native vegetation clearing Mine dewatering (category 06) Water abstraction and groundwater operating strategies Sewerage facility (category 54) Putrescible landfill site; and Mine Closure Plan The operation has these permits in place and manage the obligations through the INX InForm (legal register process). In Australia, with few exceptions, all onshore mineral rights are reserved to the government of the relevant state or territory. The Western Australian Mining Act 1978 (WA) (the “WA Mining Act”), is the principal piece of legislation governing exploration and mining on land in Western Australia. Licenses and leases for, among other things, prospecting, exploration and mining must be obtained pursuant to the requirements of the WA Mining Act before the relevant activity can begin. Where native title has not been extinguished, native title legislation may apply to the grant of tenure and some subsequent administrative processes. Heritage legislation may operate to preclude or regulate the disturbance of a particular area. The maximum initial term of a mining lease is 21 years and the holder has the right to renew the lease for a further period of 21 years. Subsequent renewals are subject to the minister’s discretion and the lease can only be assigned with the consent of the relevant minister. A general-purpose lease may also be granted for one or more of a number of permitted purposes. There are minimum expenditure requirements for most types of tenure, to ensure ongoing activity is undertaken and reported. Current leases are due for renewal over the period. E38/1964 and P38/4401.
P a g e 1 0 5 | 1 3 8 Gold Fields maintains a tenement management auditing system that flags lease renewals to meet the renewal process timeline and to keep the tenement ownership in good standing by meeting expenditure and other commitments. Gruyere has security of tenure for all current exploration and mining leases that contribute to future ore reserves in this CPR. If mining expansion is required into additional areas currently held under exploration, it would need to convert the relevant exploration licenses prior to commencing mining. This would also include negotiations with the relevant native title holders in order to obtain their consent to any proposed grant. In 2017, the Yilka People and Sullivan Edwards families were successful in having their claim under the Native Title Act 1993 (Cth) (WCD2017/005) determined by the Federal Court over an area including the Gruyere mine. GRM is party to an agreement with the Yilka People that gives the necessary consents for the grant of mining and other tenure at Gruyere. All other permitting and licensing procedures required to start any future mining operation, inclusive but not limited to issues of heritage, local disturbance, clearing, environmental, power and water extraction/disposal permitting, follow well established authorisation protocols with the relevant state authorities. Experiences to date and knowledge of local legislation indicate that this will continue for the foreseeable future and should not adversely impact any future mining of reserves. Relevant environmental and social permitting to the Gruyere project is covered in Table 17.1.1. Table 17.1.1: List of Gruyere permits Relevant Legislation Environmental Factor Regulated / Affected Relevant Approval Requirement Aboriginal Heritage Act 1972 (DPLH) Aboriginal Heritage Sites Section 18 Approval (to interfere with Aboriginal heritage site). Archaeological and ethnographic surveys have been conducted over the project area. One section 18 application has been required to date. Dangerous Goods Safety Act 2004 (DMIRS) The storage, transport and use of Dangerous Goods on site. A Dangerous Goods licence (DGS022333) has been approved, to address storage and handling on the project, valid until Q2 2022. Environmental Protection Act 1986 Part IV (EPA) Key environmental factors assessed via EPA assessment under Part IV: Subterranean fauna. Flora. Ministerial Statement received 29 December 2016. Conditions set in Ministerial Statement No. 1048. Section 45c approved on 5 September 2017 and Ministerial Statement with attachment 1 was received. Section 45c approved on 18 April 2018 and Ministerial Statement with attachment 1 was received. Environmental Protection Act 1986 Part V (DWER) Pollution control for emissions to: Land. Surface water. Ground water. Air. Noise. The project was granted a Works Approval (Works Approval W5997 and W6002) and the following categories are licenced under L9000/2016/1, valid until Q3 2037: 05 – Beneficiation of metallic and non-metallic ore. 12 - Screening etc. of material. 54 – Sewage facility. 64 – Class II or III putrescible landfill site. 73 – Bulk storage of chemicals. The recent power plant expansion was approved under licence L9153/2018/1, and the following categories are valid until Q3 2038. 52 Electrical power generation. Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) (Department of Environment and Energy) Impacts to matters of national significance GRM assessed the potential impacts of the Project and determined that there were no potential matters of nation environmental significance. Referral and approval under the EPBC act was therefore not required. Health Act 1911 Department of Health (DoH) delegated to Shires Relevant to waste water treatment for accommodation and workshops: Biodiversity, flora, fauna and ecosystem. Water resources. Building Permit Application (sewage facility). Waste Water Treatment Plant Approval (W6002/2016/1). Gruyere Gold Accommodation Village Recycled Water Scheme Approval given 2017.
P a g e 1 0 6 | 1 3 8 Relevant Legislation Environmental Factor Regulated / Affected Relevant Approval Requirement Mines Safety and Inspection Act 1994 (DMIRS) Human Safety A Project Management Plan has been approved by DMIRS for site operations. Mining Act 1978 (Mining Act) (DMIRS) Biodiversity, flora, fauna and ecosystem. Water resources. Mine closure. Mining Proposal which details disturbance and operations. Rights in Water and Irrigation Act 1914 (DWER) Water resources. Water dependent natural ecosystems. 26D Licence to construct bores - CAW181658(1). 5c Licences to take groundwater - GWL 177087 (4) and GWL 176189 (5). Biodiversity Conservation Act 2016 (DBCA) Ethical handling of native fauna Fauna handling permits required to handle native fauna. Notes: a) The Qualified person has selected a few permits to demonstrate permitting b) The Qualified person is of the opinion that the licenses are in good standing and that any current or future licensing can and will be obtained for the Mineral reserve or the Mineral resource. c) The Qualified person is of the opinion that Gruyere has a good standing with licensing authorities, community groups and that licensing is not expected to be material to reserves or resources d) Gruyere is conducting continues rehabilitation and has a large closure liability. The Qualified person is of the opinion that the closure estimates and duration are reasonable and practical Source: Gruyere CPR, 2021 Other regulatory requirements including those associated with operation and management of the TSF, pipelines, dewatering, rehabilitation, and exploration, are managed under the Mining Act 1978 in the form of tenement conditions administered by the DMIRS. The Gruyere Joint Venture manages these legal and other requirements as part of the ISO14001 certified Environmental Management System (EMS) and the Gruyere Environmental Obligation Register. Gold Fields is a signatory to the International Cyanide Management Code (ICMC), which is a voluntary code on cyanide management. The Gruyere Joint Venture intends to achieve ICMC compliance in 2019. There is no legal obligation in Western Australia to have unconditional performance bonds in place for mine closure liabilities. Such liabilities for continuing operations are now self-funding. In addition, companies are required to pay a levy to the state based on the total mine closure liability. This levy is 1 % of the total liability per mine, paid annually. This levy goes into a state administered fund known as the Mine Rehabilitation Fund. Capital and interest from the fund will be used to rehabilitate legacy sites or sites that have prematurely closed or been abandoned. 17.2 Environmental studies Gruyere is entitled to mine all declared material falling within its respective Mining Leases with all necessary statutory mining authorisations and permits in place. Table 17.2.1 shows the current Environmental Impact Assessments (EIA) and Environmental Management Program Reports (EMPR) include: Table 17.2.1: Flora and Fauna Survey Project Company Year Applicable Policy and Limitations Flora and Fauna Level 1 flora and vegetation survey (Autumn) 2014. Gruyere Botanica Consulting 2014 Guidance Statement No. 51: Terrestrial Flora and Vegetation Surveys for Environmental Impact Assessment in Western Australia (EPA 2004b). Position Statement No. 3: Terrestrial Biological Surveys as an Element of Biodiversity Protection (EPA 2002). There were two minor limitations to the survey these were: Timing of survey, weather and season - above average rainfall had been received before the survey; however the survey was conducted outside of optimal flowering period for the majority of species. Survey intensity – Additional survey work may be required during optimal flowering periods. Level 2 flora and vegetation survey (Spring) 2014. Gruyere Botanica Consulting 2014 Guidance Statement No. 51: Terrestrial Flora and Vegetation Surveys for Environmental Impact Assessment in Western Australia (EPA 2004b).
P a g e 1 0 7 | 1 3 8 Survey Project Company Year Applicable Policy and Limitations Position Statement No. 3: Terrestrial Biological Surveys as an Element of Biodiversity Protection (EPA 2002). The only limitation to this survey was the fact that rainfall for the winter months preceding the survey were below average. This was considered a minor limitation. Level 2 flora and vegetation survey (Autumn) 2015. Gruyere Botanica Consulting 2015 Guidance Statement No. 51: Terrestrial Flora and Vegetation Surveys for Environmental Impact Assessment in Western Australia (EPA 2004b). Position Statement No. 3: Terrestrial Biological Surveys as an Element of Biodiversity Protection (EPA 2002). The only limitation to this survey was relating to PATN data analysis due to BC staff only having basic statistical training. This was considered a minor limitation. The potential limitation was addressed by a peer review by an experienced statistician. Level 1 flora and vegetation survey (Autumn) 2015. Gruyere Borefields Botanica Consulting 2015 Guidance Statement No. 51: Terrestrial Flora and Vegetation Surveys for Environmental Impact Assessment in Western Australia (EPA 2004b). Position Statement No. 3: Terrestrial Biological Surveys as an Element of Biodiversity Protection (EPA 2002). There were two minor limitations to the survey these were: Mapping reliability – high quality ortho aerial images were unobtainable, however aerials used were considered sufficient. Area disturbance – vegetation was in various stages of fire regrowth. Level 1 flora and vegetation survey (Autumn) 2016. Gruyere Borefields Botanica Consulting 2016 Guidance Statement No. 51: Terrestrial Flora and Vegetation Surveys for Environmental Impact Assessment in Western Australia (EPA 2004b). Position Statement No. 3: Terrestrial Biological Surveys as an Element of Biodiversity Protection (EPA 2002). There was one minor limitation to the survey: * Area disturbance – vegetation ranged from health rating 2 to 3 due to being in various stages of fire regrowth. Level 1 flora and vegetation survey (Autumn) 2016. Gruyere Accommodation Village and Airstrip Botanica Consulting 2016 Guidance Statement No. 51: Terrestrial Flora and Vegetation Surveys for Environmental Impact Assessment in Western Australia (EPA 2004b). Position Statement No. 3: Terrestrial Biological Surveys as an Element of Biodiversity Protection (EPA 2002). There was one minor limitation to the survey: Area disturbance – vegetation had a health rating of 3 due to some signs of damage caused by human activities since European settlement. Level 1 Flora and Fauna Survey Gruyere Borefields Borefields Botanica Consulting 2016 Guidance Statement No. 51: Terrestrial Flora and Vegetation Surveys for Environmental Impact Assessment in Western Australia (EPA 2004b). Position Statement No. 3: Terrestrial Biological Surveys as an Element of Biodiversity Protection (EPA 2002). There was one minor limitation to the survey: Area disturbance – vegetation ranged from health rating 2 to 3 due to being in various stages of fire regrowth. Level 1 vertebrate fauna survey (Autumn) 2014. Gruyere Greg Harewood / Botanica Consulting 2014 Guidance Statement No. 20: Sampling of Short Range Endemic Vertebrate Fauna for Environmental Impact in Western Australia (EPA 2009). Guidance Statement No. 54: Consideration of Subterranean Fauna in Groundwater and Caves during Environmental Assessment in Western Australia (EPA 2003). Guidance Statement No 54a: Sampling Methods and Survey Considerations for Subterranean Fauna in Western Australia (EPA 2007). Guidance Statement No. 56: Terrestrial Fauna Surveys for Environmental Impact Assessment (EPA 2004b). Position Statement No. 3: Terrestrial Biological Surveys as an Element of Biodiversity Protection (EPA 2002). Technical Guide: Terrestrial Vertebrate Fauna Surveys for Environmental Impact Assessments (EPA 2010). Limitations for this survey included: No seasonal sampling being undertaken. Some fauna species have been reported to potentially occur in the survey area based on there being suitable habitat. Level 2 vertebrate fauna survey and SREs (Spring) 2014. Gruyere Rapallo Environmental 2014 Guidance Statement No. 20: Sampling of Short Range Endemic Vertebrate Fauna for Environmental Impact in Western Australia (EPA 2009). Guidance Statement No. 56: Terrestrial Fauna Surveys for Environmental Impact Assessment (EPA 2004b). Position Statement No. 3: Terrestrial Biological Surveys as an Element of Biodiversity Protection (EPA 2002). Technical Guide: Terrestrial Vertebrate Fauna Surveys for Environmental Impact Assessments (EPA 2010). Two limitations were noted during this survey, they are:
P a g e 1 0 8 | 1 3 8 Survey Project Company Year Applicable Policy and Limitations Proportion of fauna identified/recorded – Lower than anticipated numbers of species from common taxonomic groups were recorded. Timing – hot, dry conditions may have contributed to lower than anticipated faunal abundance although survey timing did conform to EPA (2010) recommendations. Level 1 vertebrate fauna survey (Spring) 2015. Gruyere Borefields Greg Harewood 2015 Guidance Statement No. 20: Sampling of Short Range Endemic Vertebrate Fauna for Environmental Impact in Western Australia (EPA 2009). Guidance Statement No. 54: Consideration of Subterranean Fauna in Groundwater and Caves during Environmental Assessment in Western Australia (EPA 2003). Guidance Statement No 54a: Sampling Methods and Survey Considerations for Subterranean Fauna in Western Australia (EPA 2007). Guidance Statement No. 56: Terrestrial Fauna Surveys for Environmental Impact Assessment (EPA 2004b). Position Statement No. 3: Terrestrial Biological Surveys as an Element of Biodiversity Protection (EPA 2002). Technical Guide: Terrestrial Vertebrate Fauna Surveys for Environmental Impact Assessments (EPA 2010). Level 1 flora and vegetation survey (Autumn) 2016. Gruyere Borefields Botanica Consulting 2016 Guidance Statement No. 51: Terrestrial Flora and Vegetation Surveys for Environmental Impact Assessment in Western Australia (EPA 2004b). Position Statement No. 3: Terrestrial Biological Surveys as an Element of Biodiversity Protection (EPA 2002). There was one minor limitation to the survey these were: Area disturbance – vegetation ranged from health rating 2 to 3 due to being in various stages of fire regrowth. Level 1 flora and vegetation survey (Autumn) 2016. Gruyere Accommodation Camp and Airfield Botanica Consulting 2016 Guidance Statement No. 51: Terrestrial Flora and Vegetation Surveys for Environmental Impact Assessment in Western Australia (EPA 2004b). Position Statement No. 3: Terrestrial Biological Surveys as an Element of Biodiversity Protection (EPA 2002). There was one minor limitation to the survey: Area disturbance – vegetation had a health rating of 3 due to some signs of damage caused by human activities. Level 1 Flora and Fauna Survey Gruyere Borefields Borefields Botanica Consulting 2016 Guidance Statement No. 51: Terrestrial Flora and Vegetation Surveys for Environmental Impact Assessment in Western Australia (EPA 2004b). Position Statement No. 3: Terrestrial Biological Surveys as an Element of Biodiversity Protection (EPA 2002). There was one minor limitation to the survey: Area disturbance – vegetation ranged from health rating 2 to 3 due to being in various stages of fire regrowth. Level 1 Flora and Fauna Survey Gruyere Borefields Borefields Botanica Consulting 2017 Technical Guide – Terrestrial Flora and Vegetation Surveys for Environmental Impact Assessment (DPaW and EPA 2016) Guidance Statement No. 56: Terrestrial Fauna Surveys for Environmental Impact Assessment (EPA 2004b). There was one minor limitation to the survey: * Area disturbance – vegetation ranged from very good to good. Vegetation in various stages of fire regrowth. Memorandum: Gruyere Camp and Airstrip Flora and Fauna Assessment Supplementary Information Gruyere Camp and Airstrip Botanica Consulting 2018 Desktop Assessment Short Range Endemics Level 2 SRE survey (Spring) 2015. Gruyere Greg Harewood 2015 Guidance Statement No. 20: Sampling of Short Range Endemic Vertebrate Fauna for Environmental Impact in Western Australia (EPA 2009). Guidance Statement No. 54: Consideration of Subterranean Fauna in Groundwater and Caves during Environmental Assessment in Western Australia (EPA 2003). Guidance Statement No. 56: Terrestrial Fauna Surveys for Environmental Impact Assessment (EPA 2004b). Position Statement No. 3: Terrestrial Biological Surveys as an Element of Biodiversity Protection (EPA 2002). Environmental Assessment Guideline12: Consideration of Subterranean Fauna in Environmental Impact Assessment in Western Australia (EPA 2013a). Subterranean Fauna
P a g e 1 0 9 | 1 3 8 Survey Project Company Year Applicable Policy and Limitations Subterranean fauna survey (mine area) 2015. Gruyere MBS Environmental 2015 Guidance Statement No 54a: Sampling Methods and Survey Considerations for Subterranean Fauna in Western Australia. (EPA 2007). Environmental Assessment Guideline12: Consideration of Subterranean Fauna in Environmental Impact Assessment in Western Australia (EPA 2013a). Subterranean fauna survey 2015/2016 Gruyere Borefields Bennelongia 2015 / 2016 Guidance Statement No 54a: Sampling Methods and Survey Considerations for Subterranean Fauna in Western Australia. (EPA 2007). Early to Mid- 2016 Guidance Statement No 54a: Sampling Methods and Survey Considerations for Subterranean Fauna in Western Australia. (EPA 2007). Water Hydrogeological study 2015 Gruyere Pennington Scott 2015 State-wide Policy No. 5.12 – Hydrogeological Reporting Associated with a Groundwater Well Licence (DOW2009). Hydrogeological summary 2016 Gruyere Pennington Scott 2016 State-wide Policy No. 5.12 – Hydrogeological Reporting Associated with a Groundwater Well Licence (DOW2009). H3 Hydrogeological report updated 2016 Gruyere Pennington Scott 2016 State-wide Policy No. 5.12 – Hydrogeological Reporting Associated with a Groundwater Well Licence (DOW2009). Soil and Landform Soil and landform assessment 2015 Gruyere MBS Environmental 2015 Guideline on Laboratory Analysis of Potentially Contaminated Soil. Schedule B3 (NEPM 2013a). Guideline on Investigation Levels for Soil and Groundwater. Schedule V1 (NEPM 2013 b). Waste Characterisation Waste rock characterisation 2015 Gruyere MBS Environmental 2015 Guidelines for Fresh and Marine Water Quality (ANZECC 2000). Tailings geochemical characterisation 2015 Gruyere MBS Environmental 2015 Global Acid Rock Drainage Guide (INAP 2009). Heritage Heritage survey 2004 Yamarna Exploration Area Traditional Owners Archaeologists 2004 N/A Ethnographic Cultural Mapping survey (Spring) 2015 Gruyere Anthropologists Senior Men 2015 Guidance for the Assessment of Environmental Factors - Assessment of Aboriginal Heritage No. 41) (EPA, 20004). Heritage surveys 2016 Gruyere Yilka Aboriginal Corporation / Yilka Heritage and Land Care 2016 Additional surveys undertaken pursuant to the native title agreement between the Yilka People and the Gruyere Project Joint Venture. Source: Gruyere CPR, 2021 17.3 Waste disposal, monitoring and water management 17.3.1 Tailings storage facilities (TSF) Figure 17.3.1 shows the location of the vibrating wire piezometers (VWPs) around the perimeter embankment. All VWPs except VWP06 were recently installed during the construction of the Stage 2 embankment as the original VWPs were damaged, resulting in missing data before January 2021.
P a g e 1 1 0 | 1 3 8 Figure 17.3.1: VWP locations Source: Gruyere CPR 2021 Except for VWP06, all VWPs measured negligible pore pressure during 2021. VWP06 and VWP09 have shown increasing pore pressure response, which coincides with the visible seepage along the southern part of the TSF. The response appears to be aligned with the increase in pond elevation, which will continue to rise with ongoing tailings deposition. With increased seepage, it was recommended that the readings be collected more frequently (monthly), especially for the VWPs located at the seepage area. In addition, GRM plans to install a telemetry system as part of the Stage 3 raise project to enable real-time monitoring. Monitoring of the piezometric levels will be continued, especially the rising of pore pressure measured by VWP06. The monitoring bore locations are illustrated in Figure 17.3.2. The bores include eight previously installed monitoring bores (TSFM1 to TSFM8) and five recently installed bores (TSFM11 to TSFM15) following AECOM's (2020) recommendation to mitigate seepage and the rising groundwater levels.
P a g e 1 1 1 | 1 3 8 Figure 17.3.2: TSF monitoring bore locations (25 July 2020) Source: Gruyere CPR 2021 TSFM5, TSFM11 and TSFM13 were commissioned in October 2020, while TSFM2 was commissioned 2 months later. As a result, the groundwater at some of the bores started to drop in level, with others remaining high. Groundwater levels at each dewatering bore location, therefore, respond well to the dewatering, with the overall rise in groundwater discontinuing. However, some surrounding monitoring bores do not show the same response. A detailed assessment of groundwater quality and levels was recently undertaken by AECOM (2021). In addition, GRM recently commissioned AECOM to undertake a study to investigate further measures needed to manage the mounding and therefore mitigate the impact of plume development, shallow seepage and surface expressions. This study is ongoing. While the quality of the abstracted water is decreasing, it indicates that the recovery bores and sump are effective under current-day conditions. Elsewhere around the TSF, the only area with a rising water table and increasing salinity is TSFM8. While the levels have risen at TSFM1 and TSFM7, increasing salinities have not yet been recorded. Cyanide was detected at low concentrations in most bores at different times during late 2019 or 2020. Detections of WAD cyanide generally accompanied detections of total cyanide. The highest concentrations are associated with the two main seepage flowpaths currently subject to seepage recovery abstraction. At sites within the main seepage zones,
P a g e 1 1 2 | 1 3 8 the concentrations of several trace metals, including cobalt, iron, magnesium, manganese, and mercury, have increased shortly after the salinity increased. However, they are mostly below the applicable stock drinking water limits. Only mercury and, in one case, selenium, have consistently increased above their stock limits. Table 17.3.1 details the available total freeboard against overtopping based on the quarterly survey conducted by Lone Star Surveys Pty Ltd. It is noted that the facility currently has ample freeboard, exceeding the minimum total freeboard requirement of 0.5 m. The next raise (Stage 3) construction will be completed well ahead of reaching the maximum capacity. Table 17.3.1: Available freeboard Parameter Q2, 2020 Q3, 2020 Q4, 2020 Q1, 2021 Q2, 2021 Q3,2021 Survey Date 06/06/2020 27/09/2020 10/01/2021 18/04/2021 21/06/2021 13/10/2021 Available Freeboard ≥5.8 m (Stage 1) ≥9.8 m (Stage 2) ≥8.4 m (Stage 2) ≥7.4 m (Stage 2) ≥6.7 m (Stage 2) >5.5 m Notes: Available freeboard refers to the vertical distance between the embankment crest and the pond elevation when the survey was taken Source: Gruyere CPR, 2021 InSAR scans are carried out quarterly. From a facilities safety perspective, no areas of concern were noted over the past 12 months. SRK carried out a stability review of the TSF in Q3 2021 ad confirmed that the factors of safety are above the minimum requirements as per the ANCOLD guidelines. GRM manages and updates the site-wide GoldSim water balance every quarter when the topographical survey data become available. Groundwater Resource Management Pty Ltd originally developed the model to align with the requirements as stipulated by the Cyanide Code. The model includes additional components as follows: probabilistic analysis to estimate the impact on water volumes, water levels and the TSF freeboard under normal operating conditions and the DMIRS storm events (1:100 AEP, 72 h) assessment of a power outage scenario during a storm event, i.e., no pumping. GRM is in the process of updating the water balance model to include more-accurate parameters such as seepage recovery and the recent changes due to the infrastructure, such as the seepage return sumps and groundwater being recovered. The requirement for flow meters for all new infrastructure will be assessed as part of this update. The EoR carries out quarterly inspections and submits quarterly inspection reports along with an annual performance review report. The Stage 3 lift has commenced in June 2021 and is due for completion in March 2022. The TSF at Gruyere is being well managed from a facility safety and governance perspective: a) The Qualified person has the opinion that the procedures and monitoring, water management practices are adequate for the life of mine reserve estimate. 17.3.2 Waste rock dumps Design and construction parameters for waste rock landforms are determined through “best practice” materials characterisation and erosion testing and modelling. For new landforms, this process is undertaken as part of the Mining Proposal preparation process and for the existing and “legacy” landforms, these are undertaken as required, for remedial and closure planning. Unless indicated otherwise, each landform/project area has a specific set of design and construction parameters developed, representing a closure concept. The closure plan is updated with these details as required:
P a g e 1 1 3 | 1 3 8 a) The Qualified person is of the opinion that the waste rock dumps at Gruyere are adequate for this life of mine reserve plan. Regular waste rock inspections are performed to assess safety. 17.3.3 Water management Raw and process water is abstracted from the Yeo borefield for use in the process plant and general amenities. Estimated plant usage is 20,500 kL/day and is delivered using a single transfer pumping station and a system of buried pipelines. Water recovered from dewatering of the Gruyere open pit is used for dust suppression and is supplemented by raw water from the borefields. Water requirements for dust suppression are estimated 0.6 GL/a. Any excess water from the pit or storm events is pumped to the process plant. Discharge from the ex- pit boreholes and horizontal seep wells is pumped to the raw water storage dam and utilised for dust suppression. Wastewater and treated wastewater from the sewerage plant are discharged via a spray field at both the village and site. Most of the water at Gruyere is reused within the mining and processing circuits. Storage is largely in settling and storage ponds. The key operational areas are supported with tanks that contain enough surge volume to ensure minimal interruption in the event of a pump failure at one of the ponds. Two 5C groundwater licences (GWLs) were issued in March 2013 to abstract up to 1,200,000 kL/a. GWL176189 was for 600,000 kL/a from the Yeo and Anne Beadell paleochannel aquifers for processing and other mining activities and GWL177087 was for 600,000 kL/a from the fractured rock aquifer around the mine operation area for dewatering purposes. Amendments were approved to GWL176189 and GWL177087 in December 2015 to use water about 30 km to the east of the mine and increase the allocation in both GWLs. The increase for GWL176189 was to abstract up to 7.8 GL/a from the Yeo and Anne Beadell WSAs and to increase the allocation from GWL177087 to 0.8 GL/a to cover the mine dewatering and construction water supplies. During 2016, an updated water balance based on new data from Coffey as part of the Gruyere feasibility study indicated an increase in water return from the TSF and an increase in water recovered through slurry thickening. The site water requirement dropped to 5,800,000 kL/a, with demand from Yeo reduced to 4,800,000 kL/a. Modelling and analysis conducted during 2016 confirmed that impacts were not too great to impact subterranean fauna. In February 2017, the OEPA granted approval based on the updated water balance indicating a total requirement of 5,800,000 kL/a and contingent on submission and approval of Subterranean Fauna Management Plan. In March 2017, a new water balance assumed no returns from the TSF, no rainfall and maximum evaporation, which increased demand from the Yeo borefield to 7,400,000 kL/a. Modelling and analysis again confirmed that this abstraction should not impact subterranean fauna. To enable the Project to move into the construction phase, 5C groundwater licences were obtained from the DWER in June 2017 including GWL176189(2) for 400,000 kL and GWL177087(3) for 400,000 kL for the purposes of the currently designed Project on relevant tenements. The Yeo bore field was excised from the licenses, due to constraints from subterranean fauna, and an application proceeded independently following completion of the field investigation program in March 2018. In August 2017, an application was submitted to the DWER for the transfer of a water entitlement from Gold Road Resources Ltd to Gruyere Management Pty Ltd for GWL176189(3) and GWL177087(4). This was granted on 15 January 2018. For construction purposes, four temporary 5C licences for the extraction of 90,000 kL each (GWL200521(1), GWL200522(1), GWL200523(1) & GWL200525(1)) were approved for the period from 20 November 2017 to 19 November 2018 for four bores in the Yeo Bore field. The subterranean fauna management plan was approved in December 2017.
P a g e 1 1 4 | 1 3 8 In January 2018, Gruyere Management applied to take 600,000 kL/a from the Anne Beadell paleochannel aquifer for temporary construction purposes. The project has acquired all required groundwater licences to meet both commissioning and operational phase requirements. The following groundwater licences were granted by the DWER: 400,000 kL/a from fractured rock under GWL177087(4) (valid to 31 May 2027); and 7,800,000 kL/a from Combined Fractured Rock West Paleochannel under GWL 176189(5) (valid to 28 November 2028). Groundwater monitoring is conducted regularly as part of the licence operating strategies, tenement conditions, and Mining Proposal commitments. These programs currently monitor the groundwater levels and water quality at the borefields and the TSF. An Annual Monitoring Report is required to be submitted to the DWER each year. Groundwater monitoring incorporates recording of abstraction volumes, water levels and groundwater quality. Table 17.3.2 summarises the monitoring commitments. These monitoring commitments will be further adjusted following lead up to mine development and acquirement of further data. Table 17.3.2: Summary of Monitoring Commitments Element Commitment Timing Abstraction Abstracted volumes to be reported to DoW. Meters to be installed as per Guidelines for Meter Installation 2009. Monthly when production bores are operational Separate water meters will be used on each water bore to ensure water use is monitored separately for each licence. Water Levels Water levels in all production bores. Water levels in selected monitoring bores. Monthly Water Quality Total Dissolved Salts (TDS) or Electrical Conductivity (EC) and pH from all production bores Comprehensive chemical analysis from all operating production bores. Monthly when production bores are operational Water Efficiency Visual Inspection of water pipes for leaks Monthly Reporting Annual Meter Readings By 7th July each Year Aquifer monitoring summary By 30th Sept each Year Aquifer Review Every 3 yrs (by 3rd Sept) Source: Gruyere CPR, 2021 17.4 Social and community 17.4.1 Native Title and heritage The Gruyere property covers an area of which there is a Native Title determination. The Yilka and Yilka #2 and Sullivan Family Native Title determination (WCD2017/005) was made by the Federal Court on the 27 September 2017. The Yilka People and Sullivan Family have appointed Yilka Talintji Aboriginal Corporation RNTBC as the prescribed body corporate (PBC) to hold the Native Title rights on trust for the whole group and provide a process by which the group can make decisions. The Gruyere Joint Venture is party to an agreement with the Yilka People signed on 3 May 2016 that gives the necessary consents for the grant of mining and other tenure at Gruyere. Following the appointment of a PBC, it is proposed that the agreement will be assigned from the Yilka People to the PBC so that benefits can flow to the entire Native Title group. Currently a 0.8 % royalty on gold produced is payable to the group. As part of the Native Title agreement, the Gruyere Joint Venture has undertaken extensive heritage surveys and cultural mapping across the entire Property area. The agreement contains certain exclusion zones and other identified areas of
P a g e 1 1 5 | 1 3 8 cultural sensitivity that cannot be disturbed. This includes Bhildbit Soak in Minnie Creek approximately 10 km to the west of Gruyere, which is the most significant known heritage site in the vicinity of the mine. No registered aboriginal heritage sites are located within Mining Lease M38/1267. The Gruyere area has a minimal history of early European mining activities. No European historical remains have been identified on-site. 17.4.2 Social programs During 2021, the Gruyere Joint Venture assisted in the following social development activities in partnership with the host communities: Local school programs – continued support for programs servicing Cosmo Newberry Primary School (Earbus, Sports Challenge Australia and Teach Learn Grow). The three programs collectively deliver outcomes relating to ear health, learning and development, self awareness, physical skills, and STEM subject mentoring. General community donations – flight assistance for local community members and Yilka consultants between Gruyere and Perth (over 80 flights in 2021), community donations for National Aborigines and Islanders Day Observance Committee (NAIDOC) and the Cosmo Newberry Primary School, in-kind donations. Support for NAIDOC week – activities on-site to raise awareness of NAIDOC and importance of the relationship with Yilka. Cultural awareness sessions – supports local business to provide indigenous cultural awareness sessions in 2021 with over 87 % of on-site personnel attending a session. Indigenous employment - supported local indigenous employment with a total of 11 current employees classified as a Local Participant Group (Yilka or Yilka associated) and a total of 23 indigenous employees on-site in total. Indigenous business – facilitating the development of indigenous business partnerships with the mining contractor. Four Yilka business owners have signed contracts for services including cleaning, labour hire, minor plant and equipment, and major plant hire. All four businesses are fully operational on-site. Community infrastructure development – provision of demountable buildings to assist with business and community relations offices at the local community with installation expected for 2022. Gold Fields’ socio-economic initiatives are focused on supporting the communities in the areas in which it operates. These initiatives include the educational, health, well-being and environmental outcomes of these communities. Recognising the important role that innovation and technology play in the mines of the future, the company continues to support various STEM (Science, Technology, Engineering and Mathematics) initiatives across the region. The Company also developed its first Reflect Reconciliation Action Plan which focuses on indigenous procurement and employment opportunities with the Company. Gold Fields has a partnership with Football West which was further extended by a two-year sponsorship agreement in 2019 to support the regional development office in Kalgoorlie, on top of the existing three-year State team sponsorship. The commitment and support to Football West is based on its commitment and focus at a regional level, which includes cultural diversity, inclusiveness and gender diversity. Membership of the Gold Industry Group (GIG) enables the Company to participate in various community investments across the region. During 2019, GIG committed to a three-year, A$5 million partnership with Netball WA, along with West Coast Fever and Shooting Stars. The partnership, which is the largest investment in Netball WA’s 95-year history, will enable GIG to work with Netball WA to create a clear pathway for women to gain employment in the gold industry, pursue higher education opportunities and become leaders and role models in the sector. 17.5 Mine closure Closure costs are reviewed internally on an annual basis with a third-party review undertaken on a rotating basis between each of Gold Fields Australian operations. The annual review records any changes in statutory requirements,
P a g e 1 1 6 | 1 3 8 closure commitments, and new disturbances or rehabilitation. Rehabilitation provisions are provided to Gold Fields annually as part of the group budgeting process. A 2020 cost closure estimate was prepared by external consultant, SRK Consulting. The process estimated the costs associated with rehabilitating the site to the standard detailed in the Mine Closure Plan as approved by the DMIRS. The LoM closure cost estimate for Gruyere in 2020 was estimated at A$64.6 million. 17.5.1 Post Closure Mine Landforms It is envisaged that at the time of mine closure, all mine infrastructure shall be removed, with only the major mine landforms remaining post closure. These landforms, which include the open mine pit, the WRDs and the TSF, shall be rehabilitated to be safe, geotechnically and geochemically stable, thereby ensuring minimal impact to the surrounding natural environment. Closure domains are classified based on areas with similar decommissioning, remediation and rehabilitation requirements to achieve the final landform and land use. The Gruyere Gold Mine has been categorised into a number of physically distinct ‘domains’ and ‘features’ to facilitate effective mine closure planning and progressive rehabilitation. Figure 17.5.1 and Figure 17.5.2 illustrate the key closure domains identified at the Gruyere Gold Mine. These closure domains and their associated features/structures are listed in Table 17.5.1. Table 17.5.1:Gruyere Gold Mine Closure Domains No. Closure Domain Feature/Structure/Facility 1 Mining Areas Gruyere Mine Pit 2 Mine Waste Landforms Integrated Mine Waste Rock Dump – WD1, WD2, WD3, WD4, WD5, WD6 ROM pad Topsoil and Construction Material Stockpiles Marginal Grade Ore Stockpiles 3 Tailings Storage Facilities TSF 4 Infrastructure Areas Process Plant area, Power Station Mine Workshops Stores, Magazine, Core Shed, Laydowns Fuel Farm Administration area 5 Water Management Facilities Water Treatment Plant (RO Plant), Sprayfield Turkeys Nest, Process Pond, Stormwater Pond Flood Control Structures 6 Borefields Yeo Water Supply, Anne Beadell Water Supply, Mine Dewatering, TSF monitoring 7 Accommodation Village Village, WWTP and Sprayfield 8 Landfills Landfill & Bioremediation Farm 9 Roads & Service Corridors Roads, Tracks & Service Corridors 10 Exploration Areas Tracks, Drill pads, Bores, Sumps 11 Airstrip Buildings Fueling Station Landing Strip & Hardstand areas Source: Gruyere CPR, 2021 Mine closure activities that are required for the rehabilitation of the landforms remaining post closure differ from domain to domain.
P a g e 1 1 7 | 1 3 8 Figure 17.5.1: Location of Regional Mine Closure Domains Source: Gruyere CPR 2021 Figure 17.5.2: Location of Central Mine Closure Domains Source: Gruyere CPR 2021
P a g e 1 1 8 | 1 3 8 17.5.2 Closure Criteria Industry leading practice requires that completion criteria must be sufficient to ensure that the overall objectives of rehabilitation have been met. These criteria must also be designed to allow effective reporting and auditing to define an endpoint for rehabilitation activities. Guidelines published by ANZMEC and MCA (2000) for completion criteria state that they should be: Specific enough to reflect unique sets of environmental, social and economic circumstances. Flexible enough to adapt to changing circumstances without compromising objectives. Include environmental indicators suitable for demonstrating that rehabilitation trends are heading in the right direction. Undergo periodic review resulting in modification if required due to changed circumstances or improved knowledge. Based on targeted research which results in more informed decisions. Completion criteria are agreed standards to be achieved on particular aspects of the project. Progressive assessment against these criteria demonstrates the relative success of rehabilitation in achieving desired outcomes. DMIRS (2020a) recognise that for each site a specific set of completion criteria needs to be developed, to determine whether the rehabilitation end point has been reached. Where possible, completion criteria should be developed from actual rehabilitation trials and site experience rather than arbitrary baseline studies conducted on analogue (local pristine) sites, which may have little edaphic or physical/chemical similarity to the mine’s soils. The significant earthworks and disturbance associated with mining often results in post-mining landforms with soil structure and properties significantly different to the pre-mining state. These differences may mean that return of pre- mining ecosystems is not readily achievable. It is crucial that closure planning is based on results of field evaluations and trials to ensure that rehabilitation methods are effective, durable and achievable. In most cases, appropriate methodologies may take years to develop and may be markedly different to initial concepts. Completion criteria will be achieved when monitoring data recorded at rehabilitated areas trends towards parameters observed at analogue sites or selected trial sites. Data previously collected and recorded through Landscape Function Analysis (LFA) at analogue sites and rehabilitated sites during the construction, operational and closure phase of mining will be analysed to develop specific closure criteria that are relevant to the site mining activity.
P a g e 1 1 9 | 1 3 8 18 Capital and operating costs 18.1 Capital costs Project development and the establishment of infrastructure at Gruyere is complete. Ongoing capital costs for Gruyere includes items classified as project capital and sustaining capital. Sustaining capital includes processing and administration capital works based on current cost forecasts and feasibility/pre-feasibility study estimates. Exploration costs are not included in the Mineral reserve LoM plan except for the first year (A$6 million). The processing plant capital expenditure for 2021 is budgeted at A$19.3 million. LoM TSF capital is budgeted at A$66.81 million. The forecast capital costs are summarized in Table 18.1.1. Table 18.1.1: Capital costs ($ million) Capital cost item Units 2022 2023 2024 2025 2026 2027 2028 2029 2030 2301 2032 2033 Mining MP&Dev $ million 32.9 110.3 95.3 107.1 95.8 155.0 110.8 117.5 - - - - Mining Capital Works $ million 3.5 3.7 3.7 3.7 3.7 6.9 6.9 5.0 2.5 1.1 - - Processing (incl. TSFs) $ million 18.4 20.4 14.8 8.9 8.9 8.1 42.2 43.4 4.9 4.9 4.9 0.1 G&A Capital $ million 7.1 1.4 1.5 1.5 1.5 1.2 0.9 1.3 1.5 1.5 1.5 0.0 Exploration $ million 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Capital costs $ million 62.3 136.3 115.9 121.7 110.5 171.8 161.3 167.7 9.4 8.0 6.9 0.6 Notes: a) Rounding of figures may result in minor computational discrepancies b) The capital costs are based on the 31 December 2021 life of mine schedule for proven and probable reserves. c) No inferred Mineral resource is included in the life of mine processing schedule or techno-economic evaluation. d) Exploration costs are limited to year one in the life of mine cash flow model. Gold Fields is expecting to spend between $80 million and $100 million per annum on reserve generation exploration to replace depletion with approximately a quarter share going to Gruyere. e) Closure cost is 'Day of Assessment' as at 31 December 2021 with subsequent life of mine disturbance rehabilitation added. f) Tailing storage facilities are costed according to the life of mine requirements. The current in-pit tailings storage facility is expected to have reached capacity before the reserve life of mine is consumed. The cost of the replacement facility is included in the life of mine financial model Source: Gruyere CPR, 2021 18.2 Operating costs Operating costs are divided into three main areas with the following average costs over the Mineral reserve LoM plan: mining - A$3.60/t mined, processing - A$13.98/t treated and onsite/offsite general administration - $3.78/t treated. Mining costs are based on the schedules from the current mining contract and owners cost as per the 2021 business plan. Open pit mining cost estimates for the satellite pits are based on the 2020 pre-feasibility study. Lease costs include power and gas pipeline leases plus the mining fleet and maintenance facility. The take or pay agreement with APA is for 15 years. Power generation capacity charges and gas transportation changes are increased in the final 4 years as the LoM plan does not currently extend to 15 years. Budgeted operating costs for the 31 December 2021 Mineral reserve LoM plan are summarized in Table 18.2.1. Table 18.2.1: Operating costs ($ million) Operating cost item Units 2022 2023 2024 2025 2026 2027 2028 2029 2030 2301 2032 2033 Mining $ million 60.9 37.0 52.0 40.0 51.6 35.8 79.3 48.0 98.6 45.1 - - Processing $ million 118.3 118.3 118.5 118.5 118.5 123.7 130.1 123.0 118.5 118.5 118.5 4.5 G&A Operating $ million 30.8 32.0 33.7 33.7 33.7 33.7 33.7 33.7 33.7 33.7 33.7 1.1 Operating costs $ million 209.9 187.3 204.2 192.2 203.8 193.2 243.1 204.7 250.9 197.3 152.2 5.6 Notes: a) Rounding of figures may result in minor computational discrepancies
P a g e 1 2 0 | 1 3 8 b) The operating costs are based on the 31 December 2021 life of mine schedule for proven and probable reserves. The Mineral resource and exploration required to replace depleted reserves is no included in this techno-economic assessment c) No inferred Mineral resource is included in the life of mine processing schedule or techno-economic evaluation d) Costs are first principles based on the Mineral reserve life of mine schedule e) This operating cost summary estimate is for the Mineral reserve life of mine schedule Source: Gruyere CPR, 2021 Overhead costs at Gruyere are largely based on the required and necessary technical and administrative support services required to sustain current and future mining production. Usually these are assigned with fixed and variable cost components per tonne of ore. Corporate costs are assigned as variable based on ounces sold. Gruyere has an estimated rehabilitation liability of $47.8 million. Terminal benefits liabilities are not included in overhead costs as per group policy and directives. Rehabilitation costs are included following completion of mining. Table 18.2.2: Closure and holding cost post life of mine reserves Sources Units 2034 2035 2036 2037 2038 Post Reserve LOM Closure $ million 10.1 5.0 5.2 1.0 16.0 Source: Gruyere CPR, 2021 The Qualified person’s opinion on capital and operating costs is summarized below: a) The financial schedule is wired to the life of mine plan to ensure the provision of capital is linked to when the major budgeted items require to be funded b) The capital, operating and closure cost estimation levels of accuracy meet the minimum pre-feasibility study requirements at an estimated accuracy of ±25 % and require no more than 15 % contingency. The specific engineering estimation methods have an accuracy equal to or better than this range. c) Gruyere has improved capital estimation and capital delivery through the application of Group Capital Standards and capital projects review by a select team with improved implementation planning. Gold Fields also perform post investment reviews across all major capital studies and share key learnings. d) Gold Fields’ two-year business planning cycle captures operating and capital costs along with key physicals and revenue. The business plans are internally reviewed, presented to the Executive Committee for approval, prior to sanctioning by the Gold Fields board of directors. The business plans are aligned with the Registrant’s strategic direction and equate to the first two years of the life of mine plan. e) Capital expenditure, once sanctioned, must follow the company capital reporting standard. Monthly and quarterly reviews are held to assess capital programs, operating unit costs, mine physicals, plan execution and revenue streams. f) Operating unit costs are based on recent valid historical performance and where necessary take account of future changing circumstances that are anticipated to impact future operating costs
P a g e 1 2 1 | 1 3 8 19 Economic analysis 19.1 Key inputs and assumptions Under the 31 December 2021 Mineral reserve LoM plan, the Gruyere processing facility is not at full capacity for the full life of the operation. A portion of incrementally costed material is included, which supplements the fully costed feed but does not extend the life of the operation. The mining of the incremental material covers the full unit cost of mining, the variable unit costs of processing, rehabilitation and closure, and positively contributes to fixed overheads and off-site costs. Detailed assessments were undertaken, with iterative reviews prior to inclusion of this material in the 12-year LoM plan The economic assumptions on which the analysis is based include: The reserve gold price of $1,300/oz. A state royalty rate of 2.5 %. A corporate tax rate of 30 %. Assessed losses and capital expenditure being offset against corporate taxes as Gold Fields’ Australian operations are considered as a unit for taxation purposes. A real, base case discount rate of 3.8 % as determined by Gold Fields Corporate Finance on an annual basis. The discounted cash flow (DCF) being applied to annual post-tax, pre-finance cash flows reported in financial years ending December. The Mineral reserve LoM physical inputs, operating and capital costs, including rehabilitation, leasing and closure costs, and revenue assumptions for the economic analysis are summarised in Table 19.1.1. Table 19.1.1: Gruyere Mineral reserve LoM plan Sources Units 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Open Pit LOM Processed koz 357.5 388.5 373.6 339.9 366.6 424.0 443.4 410.1 405.8 456.0 Recovery % 92 % 91 % 91 % 91 % 91 % 91 % 90 % 91 % 91 % 92 % Sold koz 328.5 353.8 341.7 309.7 333.4 385.6 399.8 371.8 370.0 417.4 Stockpiles LOM Processed koz 29 51 3 1 388 12 Recovery % 91 % 91 % 91 % 88 % 91 % 89 % Sold koz 26 47 3 1 355 18 Total Sold koz 328.5 353.8 368.0 356.7 336.1 385.6 400.7 371.8 370.0 417.4 355.1 18.1 Costs, Revenue and Cash flow Revenue $ million 427.1 459.9 478.4 463.7 436.9 501.3 520.9 483.4 481.0 542.7 461.6 23.6 Operating Costs $ million 214.7 192.8 210.0 198.0 209.6 199.0 248.9 210.5 256.7 203.1 158.0 5.8 Capital Costs $ million 62.3 136.3 115.9 121.7 110.5 171.8 161.3 167.7 9.4 8.0 6.9 0.6 Other $ million 26.9 21.8 26.7 26.9 25.7 21.2 22.2 28.7 35.8 25.8 18.9 35.4 Royalties $ million 14.1 15.2 15.8 15.3 20.5 24.2 25.2 23.3 23.1 26.0 22.2 1.1 Government levies $ million - - - - - - - - - - - - Interest (if applicable) $ million - - - - - - - - - - - - Costs $ million 318.0 366.1 368.3 361.9 366.3 416.1 457.6 430.2 324.9 262.9 206.0 43.0 Taxes $ million 8.0 7.3 17.3 7.2 8.9 14.6 20.2 18.5 76.1 92.7 Cash flow $ million 101.1 86.5 92.8 94.5 61.7 70.5 43.1 34.7 80.0 187.0 255.6 -19.4
P a g e 1 2 2 | 1 3 8 Sources Units 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Discounted cash flow at 3.8 % (NPV) $ million 101.1 83.3 86.1 84.5 53.2 58.5 34.5 26.7 59.3 133.7 176.1 -12.9 Notes: a) Rounding of figures may result in minor computational discrepancies b) The capital costs are based on the 31 December 2021 life of mine schedule for proved and probable Reserve only. The Mineral resource and exploration required to replace dealation is no included in this techno-economic assessment c) No Inferred Mineral resource is included in the life of mine processing schedule or techno-economic evaluation Source: Gruyere CPR, 2021 19.2 Economic analysis The NPV for Gruyere of $437.3 million is based on the DCF forecast on an annual basis and a discount rate of 3.8 % (real) using the scheduled Mineral reserves for the life of the project (as shown in Table 19.2.1). Table 19.2.1: Gold Fields 50 % Attributable Gold, FCF and NPV Sources Units 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 50 % Attributable gold koz 164.3 176.9 184.0 178.3 168.1 192.8 200.4 185.9 185.0 208.7 177.5 9.1 50 % Free Cash Flow $ million 57.6 50.1 58.1 53.9 41.4 49.4 38.6 33.3 84.7 147.0 134.4 -8.2 Discounted cash flow at 3.8 % (NPV) $ million 437.3 Notes: a) Rounding of figures may result in minor computational discrepancies Source: Gruyere CPR, 2021 19.3 Breakdown of ESG expenditure Table 19.3.1: Breakdown of ESG expenditure included in tables 18.1, 18.2 and 19,1 100 % basis Sources Units 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Progressive Closure* $ million 9.5 5.0 5.0 5.0 5.0 5.0 5.1 5.0 4.8 Notes: a) Rounding of figures may result in minor computational discrepancies Source: Gruyere CPR, 2021 19.4 Sensitivity analysis 50 % Attributable Sensitivity analyses were performed to ascertain the impact on NPV to changes in capital, operating costs, discount rate and gold price as summarised in Table 19.4.1 to Table 19.4.5. Table 19.4.1: NPV sensitivity to changes in gold price Gold Price – real -15 % -10 % -5 % 0 % 5 % 10 % 15 % 25 % 31 % Gold Price $/oz 1,105 1,170 1,235 1,300 1,365 1,430 1,495 1,625 1,700 NPV ($ million) 204.3 284.1 361.4 437.3 513.2 587.2 660.9 815.4 903.1 Source: Gruyere CPR, 2021 Table 19.4.2: NPV sensitivity to changes in grade Grade -15 % -10 % -5 % 0 % 5 % 10 % 15 % NPV ($ million) 206.0 285.1 361.9 437.3 512.7 586.2 659.3 Source: Gruyere CPR, 2021 Table 19.4.3: NPV sensitivity to changes in capital costs
P a g e 1 2 3 | 1 3 8 Capital costs -15 % -10 % -5 % 0 % 5 % 10 % 15 % NPV ($ million) 486.9 470.4 453.8 437.3 420.8 404.2 387.7 Source: Gruyere CPR, 2021 Table 19.4.4: NPV sensitivity to changes in operating costs Operating costs -15 % -10 % -5 % 0 % 5 % 10 % 15 % NPV ($ million) 544.0 508.5 472.9 437.3 401.7 366.1 330.5 Source: Gruyere CPR, 2021 Table 19.4.5: NPV sensitivity to changes in discount rate Discount rate 2 % 3 % 3.8 % 5 % NPV ($ million) 480.3 455.6 437.3 412.0 Source: St Ives CPR, 2021 The Qualified person is of the opinion that the tecno-economic model based on the Mineral reserve physicals. The Recent historic assumptions are used to test the Mineral reserve economic assumptions. The material assumptions have been found to be valid and used in the tecno-economic studies. The discounted cash flow has economic viability and a NPV of US$437.3 million at a discount rate of 3.8 %. The IRR has not been presented for this tecno-economic study. The tecno-economic study for the Mineral reserves excludes all inferred Mineral resource material.
P a g e 1 2 4 | 1 3 8 20 Adjacent properties There are no adjacent properties that are considered material to Gruyere. Gold Road’s wholly-owned project area. Australian Potash has a large potash deposit at Lake Wells to the south. Other exploration companies active in the area include Great Boulder Resources and Woomera Mining.
P a g e 1 2 5 | 1 3 8 21 Other relevant data and information Gold Fields’ commitment to materiality, transparency and competency in its Mineral resources and Mineral reserves disclosure to regulators and in the public domain is of paramount importance to the Qualified person and the registrants Executive Committee and Board of Directors continue to endorse the company’s internal and external review and audit assurance protocols. This Technical Report Summary should be read in totality to gain a full understanding of Gruyere’s Mineral resource and Mineral reserve estimation and reporting process, including data integrity, estimation methodologies, modifying factors, mining and processing capacity and capability, confidence in the estimates, economic analysis, risk and uncertainty and overall projected property value. However, to ensure consolidated coverage of the company’s primary internal controls in generating Mineral resource and reserve estimates the following key point summary is provided: a) A comprehensive quality assurance and quality control (QA/QC) protocol is embedded at Gruyere and all Gold Fields operations. It draws on industry leading practice for data acquisition and utilises national standards authority accredited laboratories which are regularly reviewed. Analytical QA/QC is maintained and monitored through the submission of sample blanks, certified reference material and duplicates and umpire laboratory checks. b) Corporate Technical Services (CTS), based in Perth, comprises subject matter experts across the disciplines of geology, resource estimation, geotechnical, mining, engineering, modernisation, capital projects, processing, metallurgy, tailings management and Mineral resource and reserve reporting governance. The CTS team budget for regular site visits to all operating mines when emphasis is placed on-site inspection and direct engagement with the technical staff to drive protocols and standards and enable on-site training and upskilling. CTS provides technical oversight and guidance to the operating Regions and mines and ensures an additional level of assurance to the Mineral resource and reserve estimates to supplement the mine sites and Regional technical teams. c) Independent audit review of fixed infrastructure is conducted annually with the appointed insurance auditor focussed on plant, machinery and mine infrastructure risks. An effective structural and corrosion maintenance programme with benchmark inspections is in place supported by equipment condition monitoring major critical component spares. Focus areas include the primary jaw crusher, ball mill shell or motor failure, structural failure of plant or conveyor, process tank failure and large transformer failure. Critical spares are well resourced and there are no large items not supported by on-site spares holdings. d) Mobile equipment is largely owned and well maintained by the mining contractor, Maca. There is some spare capacity in most of the fleets or within the Maca group, or hire units are readily available in the region. The contractors have the ability to provide larger or smaller fleets to support the life of mine reserve. e) Processing controls include the preparation of quarterly plant metal accounting reconciliation reports by the mine sites which are reviewed by the Regional Metallurgical Manager and Vice President (VP) Metallurgy in the CTS team. Any monthly reconciliation variance outside the limits provided within the Gold Fields Plant Metal Accounting Standard is flagged for follow up assessment and remediation if warranted. f) Gruyere has a tailings management plan that promotes risk minimisation to operators and stakeholders over the lifecycle of the tailings storage facility (TSF). Gruyere’s TSF’s are operated in accordance with the company TSF Management Guidelines which are aligned with the International Council on Metals & Mining’s (ICMM) Position Statement on preventing catastrophic failure of TSFs (December 2016). Active TSFs are subject to an independent, external audit every three years, as well as regular inspections and formal Facility safety reviews by formally appointed Engineers of Record (EoR). Further improvements in tailings management are expected through achievement of compliance with the new independently developed Global Industry Standard for Tailings Management (GISTM) issued in 2020. g) The integration of environmental, social and governance (ESG) themes into the estimation process continues as an important consideration for modifying factors, reasonable prospects for economic extraction (RPEE) assessments and to underpin the integrity of the Mineral resources and Mineral reserves. The company’s ESG Charter, issues and priorities are fully considered in the life of mine plan with particular emphasis on tailings
P a g e 1 2 6 | 1 3 8 management, integrated mine closure planning, security of energy and water and the social and regulatory license to operate. h) Gold Fields also follows an embedded process of third-party reviews to provide expert independent assurance regarding Mineral resource and Mineral reserve estimates and compliance with relevant reporting rules and codes. In line with Gold Fields policy, every material property is reviewed by an independent third-party on average no less than once every three years, or when triggered by a material year on year change. Certificates of compliance are received from the companies that conduct the external audits which are also configured to drive continuous improvement in the estimation process. i) Importantly, Gold Fields endorses a well embedded risk and control matrix (RACM) configured to provide an annual assessment of the effectiveness of the registrants’ internal controls concerning the life of mine planning process and Mineral resource and reserve estimation and reporting. j) The internal controls include coverage of the following (inter alia): i Reasonableness of parameters and assumptions used in the Mineral resource and reserve estimation process ii Reasonableness of the interpretations applied to the geological model and estimation techniques iii Integrity in the mine design and scheduling, including reasonableness of the mine planning assumptions, modifying factors, cut-off grades, mining and processing methods and supporting key technical inputs such as year on year reconciliation, geotechnical, mining equipment, infrastructure, water, energy and economic analysis iv Provision of the necessary skills, experience and expertise at the mine sites and the Regions to undertake and complete the work with the required level of technical ability and competency, including professional registration as a Qualified person. v Alignment with the SK 1300 rule (guidance and instruction) for the reporting of Mineral resources and reserves vi Review of the disclosure of the registrants’ Mineral resources and reserves process. k) Because of its inherent limitations, internal controls may not prevent or detect all errors or misstatements. Also, projections of any valuation of effectiveness to future periods are subject to risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with policies and procedures may deteriorate. RCubed© is a proprietary cloud-based reporting system adopted by Gold Fields in 2021 to enhance the level governance and data security concerning Mineral resource and reserve reporting across all company properties. It ensures transparency and auditability for all data verification checks, information stage gating, the approvals process and confirmation of Qualified person credentials. The RCubed© reporting system is being incorporated into the risk and control matrix RACM matrix to support the December 2021 Mineral resource and reserve reporting.
P a g e 1 2 7 | 1 3 8 22 Interpretation and conclusions The views expressed in this technical report summary are based on the fundamental assumption that the required management resources and management skills are in place to achieve the Mineral reserve LoM plan projections for Gruyere. The Gruyere Mineral reserves currently support a 12 year LoM plan that values the operation at $437.3 million at the reserve gold price of $1,300/oz. Climate change is an integral part of the Mineral reserve generation process and incorporating relevant costs associated with climate change, primarily decarbonisation, mitigation and adaptation to the changing climate, is a key theme for the Company. Integration of these key elements into the Mineral reserve process is being carried out progressively and simultaneously across all of Gold Fields’ sites. The Mineral reserve estimates contained in this report should not be interpreted as assurances of the economic life or the future profitability of Gruyere. Mineral reserves are only estimates based on the factors and assumptions described herein, thus future Mineral reserve estimates may need to be revised. For example, if production costs increase or product prices decrease, a portion of the current Mineral resources, from which the Mineral reserves are derived, may become uneconomic and would therefore result in a lower estimate of Mineral reserves. The LoM plans include forward-looking technical and economic parameters and involve a number of risks and uncertainties that could cause actual results to differ materially. The LoM plan for Gruyere has been reviewed in detail by the Qualified person for appropriateness, reasonableness and viability, including the existence of and justification for departure from historical performance. The Qualified person considers that the Technical Economic Parameters and Financial Models are based on sound reasoning, engineering judgement and technically achievable mine plan, within the context of the risk associated with the gold mining industry. The business of gold mining by its nature involves significant risks and hazards, including environmental hazards and industrial accidents. In particular, hazards associated with Gold Fields’ open pit mining operations include: Fires and explosions. Collapses of open pit walls. Flooding. Accidents related to the presence of mobile machinery. Ground and surface water pollution. Other accidents and conditions resulting from drilling, blasting and removing and processing material from an open pit mine. Accidents associated with operating a rock dump and production stockpile, and rock transportation equipment. Production disruptions due to weather. Gold Fields is at risk of experiencing any of these environmental or industrial hazards. The occurrence of any of these hazards could delay or halt production, increase production costs and result in a liability for Gold Fields. 22.1 Gruyere risks and mitigating actions The major risks and mitigation actions at Gruyere based on a formal risk review and assessment using risk ranking software are summarised in Table 22.1.1. Senior management review and update the risk register on routine basis which is reported on a quarterly basis. Table 22.1.1: Gruyere risks and mitigating actions
P a g e 1 2 8 | 1 3 8 Risk description Risk mitigating action Revenue: Gold Fields’ revenues are primarily derived from the sale of gold that it produces. Gold Fields does not generally enter into forward sales, derivatives or other hedging arrangements in order to establish a price in advance of the sale of its gold production. As a result, it is exposed to changes in the gold price, which could lead to reduced revenue and reserves impacts should the gold price decline Industry data about Gold Fields’ markets obtained from industry surveys, industry publications, market research and other publicly available third-party information. In many cases, statements in this report regarding the gold mining industry and price have been made based on internal surveys, industry forecasts, market research, as well as Gold Fields’ own experiences. Risk mitigation includes price sensitivity analyses at a range of gold prices. Exploration: Exploration activities are focused on understanding the extent of the orebody and gaining additional geological understanding of the mineralisation controls. This will feed into operational flexibility and sustainability. Exploration for gold and other metals associated with gold are speculative in nature involves many risks and is frequently unsuccessful. The Group focuses on the extension of existing orebodies and the discovery and delineation of new or bodies both at existing sites and at undeveloped sites. Best practices exploration techniques, technical peer reviews and technical specialists are employed to assist in conceptual targeting, execution and interpretation of the exploration programs. Geological, geochemical, geophysical, geostatistical and geo- metallurgical techniques are constantly refined to improve effectiveness and the economic viability of prospecting and mining activities. Once a potential orebody has been discovered, exploration is extended and intensified in conjunction with comprehensive infill drilling, to enable clearer definition of the orebody and its technical and economic probability. Reserves published do not require any additional discovery. Geology & estimation: The primary assumptions of continuity of the geologically homogenous zones are driven by the geological model, which is updated when new information arises. Any changes to the model are subject to peer and internal technical corporate review and external independent consultant review when deemed necessary At the Australian operations, the estimation of reserves for both underground and open pit operations is based on exploration and sampling information gathered through appropriate techniques, primarily from diamond drilling, reverse circulation drilling, aircore and sonic drilling techniques. Gold Fields and the sites have well documented processes, procedures and systems to ensure appropriate drilling, logging, sampling interpretation, geology orebody and lithology modelling, and estimation are completed appropriately. Overall staff focus on geology recruitment with required expertise and skills, training coaching coupled with field and peer reviews by both site and corporate staff are integrated into routine exploration and mining geology. Internal and external corporate audits, procedures and systems all enhance and support ongoing periodic review. All models are documented with peer reviews and model on model reconciliations to explore and understand the impacts of additional information, data and interpretation / methodology to support delivery of the most appropriate and best-informed outcomes Applications of alternative estimation methods to evaluate deposits are also routinely compiled to ensure the most relevant and appropriate
P a g e 1 2 9 | 1 3 8 estimation for mine planning is delivered. These may include ordinary kriging (OK), simple kriging (SK), uniform conditioning and simulation. Localised conditioning estimation techniques to validate and inform options and decisions are also considered The locations of sample points are spaced close enough to deduce or confirm geological and grade continuity depending on the Mineral resource classification category. Generally, drilling is undertaken on grids, which range between 12.5 m by 25 m up to 100 m by 100 m, although this may vary depending on the continuity of the orebody. Mine planning & scheduling: Changes in assumptions underlying Gold Fields’ Mineral reserve estimates risk. Modifying factors used to calculate the cut-off grades include adjustments to mill delivered amounts due to dilution and ore loss incurred in the course of mining, expected return on investment, and sustaining capital. These may change but typically are reviewed and managed through detailed reconciliation processes to minimize variations and impacts. Modifying factors applied in estimating Mineral reserves are primarily based on historical empirical information, but commonly incorporate adjustments for planned operational improvements. Geotechnical inputs and slope parameters are based on feasibility study estimates and reviewed for use in the mine design by qualified geotechnical personnel. Actual operational performance will be monitored and reviewed to validate and optimise slope parameters. Mineral reserves also consider operating cost levels as well as necessary capital and sustaining capital provisions required at each operation and is supported by LoM plans. Detail planning protocols and review processes by qualified and experienced technical staff both on-site and regional levels are held to ensure consistency and applicability of due process. Mining execution: The ability to achieve anticipated efficiencies and production plans due to nature of risk and impacts associated with normal mining routine activities. These could include geotechnical, equipment and maintenance, explosives, staffing, power and water supply. Benchmarking and technical reviews of all mine plans to validate and test assumptions are normal resources & reserve processes. Assumptions applied in estimating mine planning for reserves are primarily based on historical empirical information, but commonly incorporate adjustments for planned operational performance. Geotechnical evaluation and monitoring, seismic systems and open cut slope wall rock monitoring are all normal processes to mitigate risk. Equipment planned schedule and maintenance programs and condition monitoring processes are in place to ensure production capability. Social licence to operate: Many mining companies face increasing pressure over their “social license to operate” which can be understood as the acceptance of the activities of these companies by local stakeholders. While formal permission to operate is ultimately granted by host governments, many mining activities require social permission from host communities and influential stakeholders to carry out operations effectively and profitably. To maintain its social license to operate, Gold Fields may need to design or redesign parts of its mining operations to minimize their impact on such communities and the environment, either by changing mining plans to avoid such impact, by modifying operations, changing planned capital expenditures or by relocating the affected people to an agreed location. Responsive measures may require Gold Fields to take costly and time- consuming remedial measures, including the full restoration of livelihoods of those impacted.
P a g e 1 3 0 | 1 3 8 Notes: a) The Qualified person is of the opinion that the risks identifies have reasonable risk mitigations and that action plans current and future will not materially affect the life of mine reserve estimation Source: Gruyere CPR, 2021 This aspect could impact future Mineral resources and reserves, mining activity and delivery. Staffing & technical capability: Gold Fields’ ability to operate or expand effectively depends largely on the experience, skills and performance of its senior management team and technically skilled employees. Gold Fields operates in a good labour market and stable political jurisdiction which adapts recruitment, staff development / retention policies to meet labour and staffing demand so support and deliver on operations. Environmental and industrial accidents: Gold mining by its nature involves significant risks and hazards, including environmental hazards and industrial and mining accidents. These may include, for example, seismic events, fires, cave-ins and blockages, flooding, discharges of gases and toxic substances, contamination of water, air or soil resources, radioactivity and other accidents or conditions resulting from mining activities including, among other things, blasting and the transport, storage and handling of hazardous materials. Gold Fields has appropriate staffing structures and processes and programs which manage, monitor and report on key environmental, health and safety compliance. Gold Fields also subscribes to a number of international regulatory frameworks (e.g. ISO 14001, ISO18001, Cyanide Code) which include process and external audits review ND monitoring for compliance.
P a g e 1 3 1 | 1 3 8 23 Recommendations The Gruyere Mineral reserves currently support a 12-year LoM plan that values the operation at $437.3 million at the reserve gold price of $1,300/oz. The latest life of mine expansion study shows a good balance between life and value. Ongoing exploration and geological interpretation suggest that the existing Gruyere mine and tenements have the potential to extend and replace existing Mineral resources and reserves. This can be achieved by identifying and exploring prospective structural and early-stage exploration targets for both potential surface and underground operations. Ongoing structural, geochemical and geophysical programs with specialist geological reviews and target evaluation will support further drilling in 2022 to define and identify these opportunities.
P a g e 1 3 2 | 1 3 8 24 References The primary reference documents that have written consent by the appointed Gold Fields Lead Qualified persons technical report summary are. Primary reference is the Gruyere Competent Person Report 31 December 2021 for Mineral resources and Mineral reserves. This report has written consent from Mark Roux who is the Gold Fields appointed Lead Competent Person or Qualified person for Gruyere Gold Mine. Mark has accepted responsibility for the Competent Person Report 31 December 2021 for Mineral resources and Mineral reserves as a whole. The Gruyere Competent Person Report 31 December 2021 for Mineral resources and Mineral reserves is referred to in this document as “Gruyere CPR 2021”.
P a g e 1 3 3 | 1 3 8 25 Reliance on information provided by the registrant The competent person has not identified any information provided by the registrant for Gruyere that requires noting under the reliance on information provided.
P a g e 1 3 4 | 1 3 8 26 Definitions 26.1 Adequate geological evidence When used in the context of Mineral resource determination, means evidence that is sufficient to establish geological and grade or quality continuity with reasonable certainty. 26.2 Conclusive geological evidence When used in the context of Mineral resource determination, means evidence that is sufficient to test and confirm geological and grade or quality continuity. 26.3 Cutoff grade Is the grade (i.e., the concentration of metal or mineral in rock) that determines the destination of the material during mining. For purposes of establishing “prospects of economic extraction,” the cutoff grade is the grade that distinguishes material deemed to have no economic value (it will not be mined in underground mining or if mined in surface mining, its destination will be the waste dump) from material deemed to have economic value (its ultimate destination during mining will be a processing facility). Other terms used in similar fashion as cutoff grade include net smelter return, pay limit, and break-even stripping ratio. 26.4 Development stage issuer Is an issuer that is engaged in the preparation of Mineral reserves for extraction on at least one Material property. 26.5 Development stage property Is a property that has Mineral reserves disclosed, pursuant to this subpart, but no material extraction. 26.6 Economically viable When used in the context of Mineral reserve determination, means that the Qualified person has determined, using a discounted cash flow analysis, or has otherwise analytically determined, that extraction of the Mineral reserve is economically viable under reasonable Investment and market assumptions. 26.7 Exploration results Are data and information generated by mineral exploration programs (i.e., programs consisting of sampling, drilling, trenching, analytical testing, assaying, and other similar activities undertaken to locate, investigate, define or delineate a mineral prospect or mineral deposit) that are not part of a disclosure of Mineral resources or Mineral reserves. A Registrant must not use exploration results alone to derive estimates of tonnage, grade, and production rates, or in an assessment of economic viability. 26.8 Exploration stage issuer Is an issuer that has no Material property with Mineral reserves disclosed. 26.9 Exploration stage property Is a property that has no Mineral reserves disclosed. 26.10 Exploration target Is a statement or estimate of the exploration potential of a mineral deposit in a defined geological setting where the statement or estimate, quoted as a range of tonnage and a range of grade (or quality), relates to mineralisation for which there has been insufficient exploration to estimate a Mineral resource.
P a g e 1 3 5 | 1 3 8 26.11 Feasibility study Is a comprehensive technical and economic study of the selected development option for a mineral project, which includes detailed assessments of all applicable Modifying factors, as defined by this section, together with any other relevant operational factors, and detailed financial analysis that are necessary to demonstrate, at the time of reporting, that extraction is Economically viable. The results of the study may serve as the basis for a final decision by a proponent or financial institution to proceed with, or finance, the development of the project. 1. A feasibility study is more comprehensive, and with a higher degree of accuracy, than a Preliminary feasibility study (or pre-feasibility study). It must contain mining, infrastructure, and process designs completed with sufficient rigor to serve as the basis for an investment decision or to support project financing. 2. The confidence level in the results of a feasibility study is higher than the confidence level in the results of a Preliminary feasibility study (or pre-feasibility study). Terms such as full, final, comprehensive, bankable, or definitive feasibility study are equivalent to a feasibility study. 26.12 Final market study Is a comprehensive study to determine and support the existence of a readily accessible market for the mineral. It must, at a minimum, include product specifications based on final geologic and metallurgical testing, supply and demand forecasts, historical prices for the preceding five or more years, estimated long term prices, evaluation of competitors (including products and estimates of production volumes, sales, and prices), customer evaluation of product specifications, and market entry strategies or sales contracts. The study must provide justification for all assumptions, which must include assumptions concerning the Material contracts required to develop and sell the Mineral reserves. 26.13 Indicated Mineral resource Is that part of a Mineral resource for which quantity and grade or quality are estimated on the basis of Adequate geological evidence and sampling. The level of geological certainty associated with an indicated Mineral resource is sufficient to allow a Qualified person to apply Modifying factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Because an indicated Mineral resource has a lower level of confidence than the level of confidence of a Measured Mineral resource, an indicated Mineral resource may only be converted to a Probable Mineral reserve. 26.14 Inferred Mineral resource Is that part of a Mineral resource for which quantity and grade or quality are estimated on the basis of Limited geological evidence and sampling. The level of geological uncertainty associated with an inferred Mineral resource is too high to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation of economic viability. Because an inferred Mineral resource has the lowest level of geological confidence of all Mineral resources, which prevents the application of the Modifying factors in a manner useful for evaluation of economic viability, an inferred Mineral resource may not be considered when assessing the economic viability of a mining project, and may not be converted to a Mineral reserve. 26.15 Initial assessment Is a preliminary technical and economic study of the economic potential of all or parts of mineralisation to support the disclosure of Mineral resources. The initial assessment must be prepared by a Qualified person and must include appropriate assessments of reasonably assumed technical and economic factors, together with any other relevant operational factors, that are necessary to demonstrate at the time of reporting that there are reasonable prospects for economic extraction. An initial assessment is required for disclosure of Mineral resources but cannot be used as the basis for disclosure of Mineral reserves. 26.16 Investment and market assumptions When used in the context of Mineral reserve determination, includes all assumptions made about the prices, exchange rates, interest and discount rates, sales volumes, and costs that are necessary to determine the economic viability of the
P a g e 1 3 6 | 1 3 8 Mineral reserves. The Qualified person must use a price for each commodity that provides a reasonable basis for establishing that the project is Economically viable. 26.17 Limited geological evidence When used in the context of Mineral resource determination, means evidence that is only sufficient to establish that geological and grade or quality continuity are more likely than not. 26.18 Material Has the same meaning as under Part 230.405 or Part 240.12b-2. The term material, when used to qualify a requirement for the furnishing of information as to any subject, limits the information required to those matters to which there is a substantial likelihood that a reasonable investor would attach importance in determining whether to purchase the security registered. 26.19 Material of economic interest When used in the context of Mineral resource determination, includes mineralisation, including dumps and tailings, mineral brines, and other resources extracted on or within the earth's crust. It does not include oil and gas resources resulting from oil and gas producing activities, as defined in Part 210.4-10(a)(16)(i) of this chapter, gases (e.g., helium and carbon dioxide), geothermal fields, and water. 26.20 Measured Mineral resource Is that part of a Mineral resource for which quantity and grade or quality are estimated on the basis of Conclusive geological evidence and sampling. The level of geological certainty associated with a measured Mineral resource is sufficient to allow a Qualified person to apply Modifying factors, as defined in this section, in sufficient detail to support detailed mine planning and final evaluation of the economic viability of the deposit. Because a measured Mineral resource has a higher level of confidence than the level of confidence of either an Indicated Mineral resource or an Inferred Mineral resource, a measured Mineral resource may be converted to a Proven Mineral reserve or to a Probable Mineral reserve. 26.21 Mineral reserve Is an estimate of tonnage and grade or quality of Indicated Mineral resources and Measured Mineral resources that, in the opinion of the Qualified person, can be the basis of an Economically viable project. More specifically, it is the economically mineable part of a measured or Indicated Mineral resource, which includes diluting materials and allowances for losses that may occur when the material is mined or extracted. 26.22 Mineral resource Is a concentration or occurrence of Material of economic interest in or on the Earth's crust in such form, grade or quality, and quantity that there are reasonable prospects for economic extraction. A Mineral resource is a reasonable estimate of mineralisation, taking into account relevant factors such as Cutoff grade, likely mining dimensions, location or continuity, that, with the assumed and justifiable technical and economic conditions, is likely to, in whole or in part, become economically extractable. It is not merely an inventory of all mineralisation drilled or sampled. 26.23 Modifying factors Are the factors that a Qualified person must apply to Indicated Mineral resources and Measured Mineral resources and then evaluate in order to establish the economic viability of Mineral reserves. A Qualified person must apply and evaluate modifying factors to convert Measured Mineral resources and Indicated Mineral resources to Proven Mineral reserves and Probable Mineral reserves. These factors include, but are not restricted to: Mining; processing; metallurgical; infrastructure; economic; marketing; legal; environmental compliance; plans, negotiations, or agreements with local individuals or groups; and governmental factors. The number, type and specific characteristics
P a g e 1 3 7 | 1 3 8 of the modifying factors applied will necessarily be a function of and depend upon the mineral, mine, property, or project. 26.24 Preliminary feasibility study (or pre-feasibility study) Is a comprehensive study of a range of options for the technical and economic viability of a mineral project that has advanced to a stage where a Qualified person has determined (in the case of underground mining) a preferred mining method, or (in the case of surface mining) a pit configuration, and in all cases has determined an effective method of mineral processing and an effective plan to sell the product. 1. A pre-feasibility study includes a financial analysis based on reasonable assumptions, based on appropriate testing, about the Modifying factors and the evaluation of any other relevant factors that are sufficient for a Qualified person to determine if all or part of the Indicated Mineral resources and Measured Mineral resources may be converted to Mineral reserves at the time of reporting. The financial analysis must have the level of detail necessary to demonstrate, at the time of reporting, that extraction is Economically viable. 2. A pre-feasibility study is less comprehensive and results in a lower confidence level than a Feasibility study. A pre-feasibility study is more comprehensive and results in a higher confidence level than an Initial assessment. 26.25 Preliminary market study Is a study that is sufficiently rigorous and comprehensive to determine and support the existence of a readily accessible market for the mineral. It must, at a minimum, include product specifications based on preliminary geologic and metallurgical testing, supply and demand forecasts, historical prices for the preceding five or more years, estimated long term prices, evaluation of competitors (including products and estimates of production volumes, sales, and prices), customer evaluation of product specifications, and market entry strategies. The study must provide justification for all assumptions. It can, however, be less rigorous and comprehensive than a Final market study, which is required for a full Feasibility study. 26.26 Probable Mineral reserve Is the economically mineable part of an Indicated Mineral resource and, in some cases, a Measured Mineral resource. 26.27 Production stage issuer Is an issuer that is engaged in material extraction of Mineral reserves on at least one Material property. 26.28 Production stage property Is a property with material extraction of Mineral reserves. 26.29 Proven Mineral reserve Is the economically mineable part of a Measured Mineral resource and can only result from conversion of a Measured Mineral resource. 26.30 Qualified person Is an individual who is: 1. A mineral industry professional with at least five years of Relevant experience in the type of mineralisation and type of deposit under consideration and in the specific type of activity that person is undertaking on behalf of the Registrant; and 2. An eligible member or licensee in good standing of a recognised professional organisation at the time the technical report is prepared. For an organisation to be a recognised professional organisation, it must: i Be either:
P a g e 1 3 8 | 1 3 8 A. An organisation recognised within the mining industry as a reputable professional association; or B. A board authorised by U.S. federal, state or foreign statute to regulate professionals in the mining, geoscience or related field; ii Admit eligible members primarily on the basis of their academic qualifications and experience; iii Establish and require compliance with professional standards of competence and ethics; iv Require or encourage continuing professional development; v Have and apply disciplinary powers, including the power to suspend or expel a member regardless of where the member practices or resides; and vi Provide a public list of members in good standing. 26.31 Relevant experience Means, for purposes of determining whether a party is a Qualified person, that the party has experience in the specific type of activity that the person is undertaking on behalf of the Registrant. If the Qualified person is preparing or supervising the preparation of a technical report concerning Exploration results, the relevant experience must be in exploration. If the Qualified person is estimating, or supervising the estimation of Mineral resources, the relevant experience must be in the estimation, assessment and evaluation of Mineral resources and associated technical and economic factors likely to influence the prospect of economic extraction. If the Qualified person is estimating, or supervising the estimation of Mineral reserves, the relevant experience must be in engineering and other disciplines required for the estimation, assessment, evaluation and economic extraction of Mineral reserves. 1. Relevant experience also means, for purposes of determining whether a party is a Qualified person, that the party has experience evaluating the specific type of mineral deposit under consideration (e.g., coal, metal, base metal, industrial mineral, or mineral brine). The type of experience necessary to qualify as relevant is a facts and circumstances determination. For example, experience in a high-nugget, vein-type mineralisation such as tin or tungsten would likely be relevant experience for estimating Mineral resources for vein-gold mineralisation, whereas experience in a low grade disseminated gold deposit likely would not be relevant. Note 1 to paragraph (1) of the definition of relevant experience: It is not always necessary for a person to have five years' experience in each and every type of deposit in order to be an eligible Qualified person if that person has relevant experience in similar deposit types. For example, a person with 20 years' experience in estimating Mineral resources for a variety of metalliferous hard-rock deposit types may not require as much as five years of specific experience in porphyry-copper deposits to act as a Qualified person. Relevant experience in the other deposit types could count towards the experience in relation to porphyry-copper deposits. 2. For a Qualified person providing a technical report for Exploration results or Mineral resource estimates, relevant experience also requires, in addition to experience in the type of mineralisation, sufficient experience with the sampling and analytical techniques, as well as extraction and processing techniques, relevant to the mineral deposit under consideration. Sufficient experience means that level of experience necessary to be able to identify, with substantial confidence, problems that could affect the reliability of data and issues associated with processing. 3. For a Qualified person applying the Modifying factors, as defined by this section, to convert Mineral resources to Mineral reserves, relevant experience also requires: i Sufficient knowledge and experience in the application of these factors to the mineral deposit under consideration; and ii Experience with the geology, geostatistics, mining, extraction and processing that is applicable to the type of mineral and mining under consideration.
Date and Signature Page Qualified Person Signature Date Dr Julian Verbeek /s/ Dr. Julian Verbeek 27 March 2022 Richard Butcher /s/ Richard Butcher 28 March 2022 Dr Winfred Assibey-Bonsu /s/ Dr Winfred Assibey-Bonsu 27 March 2022 Andrew Engelbrecht /s/ Andrew Engelbrecht 28 March 2022 Peter Andrews /s/ Peter Andrews 27 March 2022 Daniel Hillier /s/ Daniel Hillier 28 March 2022 Johan Boshoff /s/ Johan Boshoff 28 March 2022 Andre Badenhorst /s/ Andre Badenhorst 27 March 2022 Fiona Phillips /s/ Fiona Phillips 29 March 2022 Trent Strickland /s/ Trent Strickland 29 March 2022 Marco Tassone /s/ Marco Tassone 30 March 2022 Hamish Guthrie /s/ Hamish Guthrie 29 March 2022 Mark Roux /s/ Mark Roux 29 March 2022