Skip to main content

Obsidian Energy Ltd 6-K, filed Sep 23, 2026

Obsidian Energy Ltd. (OBE)

6-K 2026-09-23 For: 2026-09-23
View Original
Added on September 23, 2026

About this 6-K

Obsidian Energy Ltd filed this 6-K on September 23, 2026.

Obsidian Energy Ltd. amended its CDN.$235,000,000 credit facilities effective August 4, 2026, setting permitted junior debt at Cdn.$350,000,000 and imposing 1.50:1.00 leverage and 20% undrawn availability tests for distributions and permitted prepayments. AI summary