ONE Nuclear Energy issued 95,553 shares to settle consulting obligations, including 38,028 shares to Revelation LLC valued at approximately $135,000 and 57,525 shares to Interest Solutions, LLC for $115,625 in fees. The company received no cash proceeds from the issuances. A press release described Project Northern Pike, a planned 1,000 MW Iowa nuclear project, and a letter of intent with SOO Green HVDC Link that does not reserve transmission capacity. AI summary
Items reported
- Item 1.01: Entered into a material agreement
- Item 3.02: Unregistered sale of equity
- Item 7.01: Regulation FD disclosure
- Item 9.01: Financial statements and exhibits
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM
CURRENT REPORT
Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934
Date
of Report:
(Exact name of registrant as specified in its charter)
| (State or other jurisdiction | (Commission | (I.R.S. Employer | ||
| of incorporation) | File Number) | Identification No.) |
| (Address of principal executive offices) | (Zip Code) |
Registrant’s
telephone number, including area code:
Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions (see General Instruction A.2. below):
| Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425) | |
| Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12) | |
| Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b)) | |
| Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c)) |
Securities registered pursuant to Section 12(b) of the Act:
| Title of each class | Trading Symbol(s) | Name of each exchange on which registered | ||
Indicate by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§230.405 of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§240.12b-2 of this chapter).
Emerging
growth company
If
an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying
with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.
Item 1.01. Entry into a Material Definitive Agreement.
On November 17, 2026, ONE Nuclear Energy Inc. (the “Company”) and ONE Nuclear Energy LLC entered into a Global Compensation Settlement Agreement (the “Revelation Settlement Agreement”) with Revelation LLC (“Revelation”) to settle outstanding consulting compensation obligations. Pursuant to the Revelation Settlement Agreement, the Company issued 38,028 shares of its common stock, par value $0.0001 per share (the “Common Stock”), valued at approximately $135,000, and agreed to register the resale of such shares on its next registration statement on Form S-1. In addition, if the Company receives aggregate cash proceeds of at least $10 million within 120 days, it will pay Revelation $135,000, plus interest at 12% per annum. Otherwise, the Company will issue additional shares of Common Stock calculated in accordance with the Revelation Settlement Agreement. Shares issued under the agreement are subject to resale restrictions, including a phased release of 10% per week following effectiveness of the applicable registration statement.
On November 18, 2026, the Company entered into a Second Addendum to Consulting Agreement (the “ICR Settlement Agreement”) with ICR, LLC (“ICR”), pursuant to which the Company issued 57,525 shares of Common Stock to ICR’s affiliate, Interest Solutions, LLC, in satisfaction of $115,625 in outstanding consulting fees. The Company agreed to register such shares for resale, and ICR agreed to limit sales to 28,763 shares per trading session.
The foregoing descriptions are qualified in their entirety by reference to the Revelation Settlement Agreement and ICR Settlement Agreement, filed as Exhibits 10.1 and 10.2, respectively, and incorporated herein by reference.
Item 3.02. Unregistered Sales of Equity Securities.
In connection with the settlement agreements described in Item 1.01 above, the Company issued an aggregate of 95,553 shares of Common Stock, consisting of 38,028 shares to Revelation and 57,525 shares to Interest Solutions, LLC, in satisfaction of outstanding consulting compensation obligations. The shares were issued in transactions exempt from registration under the Securities Act of 1933, as amended, pursuant to Section 4(a)(2) thereof. The Company received no cash proceeds from these issuances.
The information set forth in Item 1.01 is incorporated herein by reference.
Item 7.01. Regulation FD Disclosure.
On November 19, 2026, ONE Nuclear Energy Inc. (the “Company”) issued a press release discussing its Northern Pike nuclear project and providing further information about its Letter of Intent with Soo Green HVDC (“SOO Green”). A copy of the Company’s press release is attached hereto as Exhibit 99.1 and is incorporated herein by reference.
The information disclosed under this Item 7.01, including the exhibit, is being “furnished” and shall not be deemed “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), or otherwise subject to the liabilities of such section, nor shall it be deemed incorporated by reference in any filing under the Securities Act of 1933, as amended, or the Exchange Act, except as expressly set forth by specific reference in such a filing. By filing this Current Report on Form 8-K and furnishing this information, the Company makes no statement or admission as to the materiality of any information in this Item 7.01 or the exhibit attached hereto.
Item 9.01. Financial Statements and Exhibits.
(d) Exhibits.
| Exhibit No. | Description | |
| 10.1 | Global Compensation Settlement Agreement, dated November 17, 2026, by and among ONE Nuclear Energy Inc., ONE Nuclear Energy LLC and Revelation LLC | |
| 10.2 | Second Addendum to Consulting Agreement, dated as of November 18, 2026, by and between ONE Nuclear Energy Inc. and ICR, LLC | |
| 99.1 | Press Release dated November 19, 2026 | |
| 104 | Cover Page Interactive Data File (embedded within the Inline XBRL document) |
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.
| Date: November 20, 2026 | ONE NUCLEAR ENERGY INC. | |
| By: | /s/ Ann Anthony | |
| Name: | Ann Anthony | |
| Title: | Chief Financial Officer | |
Exhibit 10.1

GLOBAL COMPENSATION SETTLEMENT AGREEMENT
This Global Compensation Settlement Agreement (“Agreement”) is by and between
ONE Nuclear Energy Inc., a Delaware corporation with its principal office at 700 S. Rosemary Ave, Suite 204, West Palm Beach, FL 33401 and its affiliated entities, including but not limited to ONE Nuclear Energy LLC, a Delaware limited liability company (“ONE”)
and
Revelation LLC, a Texas limited liability company with its principal office is located at 5407 Holly Street, Bellaire, Texas, 77401 (“Consultant”).
Each of ONE and Consultant are hereinafter a “Party” and collectively the “Parties”.
WHEREAS, ONE is a developer of large-scale power generation facilities utilizing natural gas and advanced nuclear technologies to serve data center off-takers;
WHEREAS, ONE is developing various multi-GW behind-the-meter power projects in the United States (“Projects”);
WHEREAS, ONE has completed its business combination with Hennessy Capital Investment Corp. VII via a SPAC Transaction;
WHEREAS, Consultant has previously provided services to ONE under multiple consulting agreements, by and between ONE Nuclear Energy LLC and Consultant;
WHEREAS, ONE has yet to pay Consultant for said services earned under the terms of the above referenced consulting agreement; and
WHEREAS, ONE and Consultant wish to enter into an agreement to satisfy, in full, all earned and unpaid compensation owed to Consultant by ONE, upon the terms and conditions set forth herein.
NOW, THEREFORE, in consideration of the promises and the mutual covenants set forth in this Agreement, and intending to be legally bound, ONE and Consultant agree as follows:
| 1. | Payment in Full. |
| 1.1. | The Parties agree to the following modified compensation as payment in full for all amounts due and payable between ONE Nuclear Energy Inc. and/or ONE Nuclear Energy LLC and Consultant under any/all agreements. |
| 1.1.1. | Equity Component |
| 1.1.1.1. | ONE acknowledges that Consultant was to receive $150,000 worth of shares in ONE Nuclear Energy Inc., based on the opening trading price, the first day after the merger with Hennessey Investment Corp. VII. The opening trading price was $3.55/share. |
ONE Nuclear Energy Inc.
700 S. Rosemary Ave, Suite 204
West Palm Beach, FL 33904
561-779-9400

| 1.1.1.2. | The Parties hereby modify the above and now agree that ONE shall transfer to Consultant $135,000 worth of shares in ONE Nuclear Energy Inc., based on the opening trading price, the first day after the merger with Hennessey Investment Corp. VII. This equates to 38,028 shares in ONE Nuclear Energy Inc. |
| 1.1.1.3. | ONE shall register the 38,028 shares, to be transferred to Consultant, in its next S-1 filing with the Securities and Exchange Commission (SEC). Registration effectiveness is subject to SEC review and clearance. ONE anticipates filing its next S-1 Registration Statement with the SEC between November 18, 2026 and November 23, 2026. |
| 1.1.2. | Cash Component |
| 1.1.2.1. | ONE acknowledges that Consultant was to receive $120,000 in cash, however, it does not have available cash at this time and is unable to estimate reasonably when it will be able to make said payment in cash. |
| 1.1.2.2. | The Parties hereby modify the above and now agree that: |
| 1.1.2.3. | If at any time within 120 days of the execution of this agreement, ONE receives, cumulatively, $10 million or more in cash from any source or sources, then ONE shall pay to Consultant, $135,000 in cash plus an interest penalty calculated at a simple 10% annual rate. |
| 1.1.2.4. | If after 120 days after the execution of this agreement, ONE has not received, cumulatively, $10 million or more in cash from any source or sources, then ONE shall transfer to Consultant a number of shares in ONE Nuclear Energy Inc. equal to: |
($135,000 plus an interest penalty calculated at a simple 12% annual rate)
× (1.164 to reflect 120 days / 365 days of an annualized 50% late payment penalty)
/ (the closing stock price on the 120th day after the execution of this agreement)
| 1.1.2.5. | ONE shall then register said shares in its first S-1 filing with the Securities and Exchange Commission (SEC) it makes after 120 days after the execution of this agreement. Registration effectiveness is subject to SEC review and clearance. |
| 2. | Restrictions on Sale of Shares. |
| 2.1. | Any/all shares transferred to Consultant under the terms of this agreement, shall be restricted from sale until they (1) are registered under an S-1 Registration Statement, (2) the Registration Statement becomes effective and (3) then 10% of the transferred shares shall become eligible for sale each and every week for ten consecutive weeks with no further restrictions. |
ONE Nuclear Energy Inc.
700 S. Rosemary Ave, Suite 204
West Palm Beach, FL 33904
561-779-9400

| 3. | Notices and Addresses. |
| 3.1. | All notices under this Agreement shall be in writing, and shall be sufficiently given if delivered in person, by email, by FedEx, US certified mail, and/or similar overnight delivery, to the addresses as follows: |
ONE Nuclear Energy LLC
Attn: Kevin Dowd
700 S. Rosemary Ave, Suite 204
West Palm Beach, FL 33401
Tel: (561) 779-9400
Email: kdowd@onenuclearenergy.com
Revelation LLC
Attn: Al Vickers
5407 Holly Street, Bellaire, Texas, 77401
Tel: (713) 751-9804
Email: alvickers0407@gmail.com
or to such other address as either of them, by notice to the other may designate from time to time. Time shall be counted to, or from, as the case may be, the delivery in person or by mailing.
| 4. | Assignability. |
| 4.1. | This Agreement may not be assigned by Consultant without the prior written consent of ONE and any attempt to do so shall be null and void. The rights and obligations of ONE under this Agreement shall inure to the benefit of and be binding upon the successors and assigns of ONE. |
| 5. | Severability. |
| 5.1. | If any provision of this Agreement otherwise is deemed to be invalid or unenforceable or is prohibited by the laws of the state or jurisdiction where it is to be performed, this Agreement shall be considered divisible as to such provision and such provision shall be inoperative in such state or jurisdiction and shall not be part of the consideration moving from either of the Parties to the other. The remaining provisions of this Agreement shall be valid and binding and of like effect as though such provisions were not included. If any restriction set forth in this Agreement is deemed unreasonable in scope, it is the Parties’ intent that it shall be construed in such a manner as to impose only those restrictions that are reasonable in light of the circumstances and as are necessary to assure the Parties the benefits and obligations of this Agreement. |
| 6. | Governing Law, Exclusive Jurisdiction & Venue. |
| 6.1. | This Agreement and any amendments thereto shall be construed in accordance with the laws of the State of Florida, USA. Both Parties to this Agreement hereby irrevocably wave any objection to which it may possess and/or bring, now or hereafter, as to proper venue and/or inconvenient forum. The Parties agree that they have subjected themselves voluntarily to the laws of the State of Florida and that of the United States of America and will immediately abide by any decision or ruling made by any court of competent jurisdiction with the United States of America. |
ONE Nuclear Energy Inc.
700 S. Rosemary Ave, Suite 204
West Palm Beach, FL 33904
561-779-9400

| 6.2. | Each Party irrevocably and unconditionally agrees that it will not commence any action, litigation, or proceeding of any kind, whatsoever against any other party, in any way arising from or relating to this Agreement, including, but not limited to, contract, equity, tort, fraud, and statutory claims, in any form whatsoever, other than in the courts of the State of Florida, sitting in Palm Beach County, and any appellate court from any thereof. Each Party irrevocably and unconditionally submits to the exclusive, jurisdiction of such county, and agrees to bring any such action, litigation, or proceeding only in the courts of the State of Florida, sitting in Palm Beach County. Each Party agrees that a final judgment in any such action, litigation, or proceeding is conclusive, and may be enforced in other jurisdictions by suit on the judgment, or in any other manner provided by law. Each Party also irrevocably and unconditionally waves any objection it may now or hereafter have as to the venue of such suit, action, or proceeding, brought in such a court and agrees not to plead, or claim that any such court is an inconvenient forum. |
| 7. | Equitable Relief. |
| 7.1. | The Parties recognize that the Services rendered under this Agreement by Consultant are special, unique and of extraordinary character, and that in the event of the breach by Consultant of the terms and conditions of this Agreement for any reason and/or take any action in violation of the terms of this Agreement, ONE shall be entitled to equitable relief to enjoin Consultant from breaching the terms of this Agreement. |
| 8. | Dispute Resolution. |
| 8.1. | Any controversy or claim arising out of or relating to this Agreement, or the breach thereof, shall be settled by arbitration before a panel of three (3) arbitrators in the State of Florida, USA, in accordance with the rules of the American Arbitration Association. In such action, the non-defaulting Party shall not be required to plead or prove irreparable harm or lack of an adequate remedy at law or post a bond or any security. The judgment upon the award rendered by the arbitration may be entered in any court having the jurisdiction thereof. The Parties agree that any judgment issued within the jurisdiction of the United States of America shall also be enforceable within any other country. In the event of litigation between the Parties, the prevailing Party shall be entitled to reasonable attorneys’ fees and costs incurred. |
| 9. | Waiver. |
| 9.1. | The provisions of this Agreement may only be waived by written agreement of the Parties. |
| 10. | Amendments. |
| 10.1. | This Agreement may not be amended except in writing and executed by the Parties hereto. |
| 11. | Time. |
| 11.1. | Any calculations of time or dates under the terms of this Agreement shall be based on the business calendar generally recognized in the United States of America. |
| 12. | Section and Paragraph Headings. |
| 12.1. | The section and paragraph headings in this Agreement are for reference purposes only and shall not affect the meaning or interpretation of this Agreement. |
| 13. | Counterparts. |
| 13.1. | This Agreement may be executed in one or more counterparts, each of which shall be deemed an original but all of which together shall constitute one and the same instrument. The execution of this Agreement may be by actual, facsimile or pdf signature. |
| 14. | Entire Agreement. |
| 14.1. | This Agreement constitutes the entire agreement between the Parties and modifies all prior oral and written agreements between the Parties hereto with respect to the subject matter hereof. |
( the remainder of this page has been intentionally left blank )
ONE Nuclear Energy Inc.
700 S. Rosemary Ave, Suite 204
West Palm Beach, FL 33904
561-779-9400

The Parties signing below certify individually, under penalty of law, that they are duly authorized to execute this document on behalf of their respective organizations.
Agreed and acknowledged by:
| ONE Nuclear Energy Inc. | Revelation LLC | |||
| (“ONE”) | (“Consultant”) | |||
| Name: | Kevin Dowd | Name: | Al Vickers | |
| Title: | Chief Operating Officer | Title: | President | |
| Sign: | /s/Kevin Dowd | Sign: | /s/Al Vickers | |
| Date: | November 17, 2026 | Date: | November 17, 2026 | |
| ONE Nuclear Energy LLC | ||
| Name: | Kevin Dowd | |
| Title: | Chief Operating Officer | |
| Sign: | /s/Kevin Dowd | |
| Date: | November 17, 2026 | |
ONE Nuclear Energy Inc.
700 S. Rosemary Ave, Suite 204
West Palm Beach, FL 33904
561-779-9400
Exhibit 10.2
SECOND ADDENDUM TO CONSULTING AGREEMENT
This Second Addendum (the “Second Addendum”), dated as of November 17, 2026 and effective as of September 30, 2026 (the “Second Addendum Effective Date”), shall reinstate, supplement, and modify that certain Consulting Agreement, effective as of August 21, 2025 (together with this Second Addendum the “Agreement”) by and between ICR, LLC (“Consultant”) and ONE Nuclear Energy Inc. f/k/a Hennessy Capital Investment Corp. VII (“Company”). Capitalized terms used but not otherwise defined herein shall have the meanings ascribed thereto in the Agreement.
| I. | TERM: This Second Addendum shall commence on the Second Addendum Effective Date and continue in full force and effect until the completion of all of Company’s obligations contained herein. |
| II. | DUTES OF COMPANY: In addition to all of Company’s obligations stipulated in the Agreement, Company shall continue to communicate with Consultant through Consultant’s receipt of all Past Due Amounts (defined below). |
| III. | PAST DUE AMOUNTS: As of the Second Addendum Effective Date, Company has an outstanding balance owing to Consultant in the amount of One Hundred Fifteen Thousand Six Hundred Twenty-Five Dollars ($115,625.00) (the “Past Due Amounts”). |
| IV. | COMPANY SHARES: The parties have agreed that the Company may remit payment for its Past Due Amounts in the form of immediately tradeable, registered shares, of the Company (the “Company Shares”) by remitting not less than fifty-seven thousand five hundred twenty-five (57,525) Company Shares to Consultant’s affiliate, Interest Solutions, LLC. (calculation based on ONEN’s closing price on the Nasdaq exchange on Oct 6, 2026 of $2.01/share). Consultant acknowledges that prior to remitting the aforementioned shares to the Consultant, the Company is required to register such shares with the Securities and Exchange Commission (SEC) and that such registration must become effective. The Company agrees to submit such registration to the SEC within twenty-one (21) days of the date of this agreement. |
| V. | PAYMENT IN FULL. This Second Addendum represents settlement and payment in full with respect to any and all agreements between Consultant and Company. |
| VI. | SALE OF SHARES. Consultant agrees not to sell more than twenty eight thousand seven hundred sixty three (28,763) shares during a single trading session. |
| VII. | GENERAL. To the extent that the terms of this Second Addendum modify or conflict with any provisions of the Agreement, the terms of this Second Addendum shall control. All capitalized terms used in this Second Addendum and not otherwise defined herein shall have the meanings assigned to them in the Agreement. Except as specifically modified herein, all of the provisions, terms and conditions of the Agreement shall remain unchanged and in full force and effect. |
| 1 of 2 |
IN WITNESS WHEREOF, the parties have executed this Second Addendum as of the day and year set forth below.
| ICR, LLC | ONE Nuclear Energy Inc. | |||||||
| By: | /s/ John Sorensen | November 18, 2026 | By: | /s/ Kevin Dowd | November 17, 2026 | |||
| John Sorensen | (Date) | Name: | Kevin Dowd | (Date) | ||||
| Chief Operating Officer | Title: | Chief Operating Officer | ||||||
| 2 of 2 |
Exhibit 99.1

FOR IMMEDIATE RELEASE
ONE Nuclear’s Project Northern Pike Targets Up to 1,000 MW Advanced Nuclear Project in Iowa to Anchor Regional Clean Energy Economy in Agreement with SOO Green HVDC Link
Northern Pike’s proposed Gigawatt scale clean baseload generation in Iowa leverages
innovative underground transmission link to anchor project economics, expand the
state’s industrial base, support grid reliability and long-term regional growth.
WEST PALM BEACH, Fla., November 19, 2026 – ONE Nuclear Energy Inc. (Nasdaq: ONEN) (“ONE Nuclear” or the “Company”) today announced strategic progress on Project Northern Pike, its planned 1,000 megawatt (MW) clean baseload energy development in Iowa. Building on its collaborative framework and letter of intent (LOI) with SOO Green HVDC Link (“SOO Green”), the Company is advancing site evaluation to establish Iowa as a major advanced energy production hub, potentially creating thousands of high-wage in-state jobs while leveraging SOO Green’s innovative 2,100 MW underground high-voltage direct current (HVDC) line to Illinois (3) to provide the project’s commercial foundation.
Project Northern Pike at a glance (1)
| ● | Economic & jobs catalyst: Up to 1,000 MW of new nuclear generation will directly stimulate Iowa’s economy, supporting thousands of skilled construction, engineering and permanent technical jobs, with a localized manufacturing supply chain. |
| ● | Innovative transmission as an economic anchor: The LOI sets up a framework to explore transmission access from Iowa into the Commonwealth Edison (ComEd) zone of PJM in northern Illinois to provide the necessary commercial foundation to build a large-scale generation project in Iowa. |
| ● | Up to 1,000 MW of clean baseload generation: Sited in Iowa to support the state’s expanding industrial and digital infrastructure, providing 24/7 reliability alongside existing wind assets. |
| ● | Pro-growth Iowa policy environment: Development aligns with Iowa’s 2026 sales and use tax exemptions for nuclear generation (HF 2757) and the Governor’s Nuclear Energy Task Force initiatives to make host communities nuclear-ready |
| 1 |
The strategy is built on capitalizing on Iowa’s competitive advantages: land availability, strong community support, agricultural and industrial demand, and proactive state policy make it an ideal environment to generate firm, carbon-free energy. Siting this multi-billion-dollar generation asset in Iowa is made commercially viable by linking it to modern delivery infrastructure. The underground SOO Green line, planned to run about 350 miles from Mason City, Iowa, to Yorkville, Illinois (3), anchors the Iowa project by providing flexible, high-capacity interconnection between the Midcontinent Independent System Operator (MISO) and PJM, giving the Iowa facility dual-market deliverability and long-term economic certainty.
“Firm power has become one of the grid’s scarcest resources, and generating that power in Iowa will be a major catalyst for the state’s long-term economic expansion,” said Richard Taylor, Chairman and Chief Executive Officer of ONE Nuclear. “Iowa offers the ideal operational environment, a skilled workforce, and clear state policy backing new nuclear generation. By pairing local power generation with SOO Green’s innovative underground link, we create a secure commercial anchor that allows us to invest heavily in Iowa’s energy independence, create high-paying local jobs, and reinforce regional grid resilience.”
Iowa Drives Economic Expansion with Advanced Baseload Generation
With electricity demand forecast to grow from domestic manufacturing and technological infrastructure, Iowa policymakers are turning to nuclear for firm, around-the-clock power that complements the state’s wind fleet. (1) In September 2026, the Iowa Nuclear Energy Task Force, created by Governor Kim Reynolds in January 2026, concluded in its final report that advanced reactors “could play an important role” in meeting that growth, and recommended nine actions, including a statewide nuclear feasibility study and a “nuclear-ready” program for host communities. (1) Iowa also enacted House File 2757, which created sales and use tax exemptions for nuclear electric generation facilities effective July 1, 2026 (1), and in September 2026 the U.S. Department of Energy (DOE) announced a loan of up to $1.9 billion for the planned restart of Duane Arnold. ONE Nuclear’s target of up to 1,000 MW will directly expand this in-state footprint, fostering clean industrial growth, substantial tax revenues, and long-term career opportunities across Iowa host communities. (2)
Innovative Transmission to PJM Anchors Project Scale and Economics.
Regional capacity crunches across neighboring Midwest markets underscore the premium placed on reliable baseload power. (4)(5) Connecting an Iowa generation plant to SOO Green’s innovative HVDC link directly into northern Illinois will provide the project with essential off-take optionality and market access, eliminating interconnection delays that often stall major power developments.
SOO Green is designed as a quiet, unobtrusive 2,100 MW underground system that utilizes existing rail corridors without the use of eminent domain, linking Iowa generation to wider Midwest reliability needs. (3)
“Transmission is the gating item for any large nuclear project, and a having an innovative, low-impact pathway anchors our Iowa project with the commercial certainty needed to move quickly,” said Coen Weddepohl, Chief Investment Officer of ONE Nuclear. “Aligning our Iowa site selection, licensing, and technology evaluation with SOO Green’s development schedule significantly derisks the investment. It ensures that the benefits of capital investment, career creation, and clean power generation are anchored firmly in Iowa, backed by institutional off-take paths that maximize value for our shareholders. We see it as a foundation for a long-term nuclear presence in the Midwest.”
| 2 |
Status and Next Steps
The LOI is an early step. It does not allocate or reserve transmission capacity on SOO Green, and it does not obligate either company to enter into any further agreement. ONE Nuclear’s Iowa project continues to progress through site screening, community engagement, and technology evaluation, and remains subject to, among other things, licensing by the U.S. Nuclear Regulatory Commission (NRC), interconnection and deliverability studies, offtake agreements and financing. ONE Nuclear’s development plan contemplates first nuclear generation in Iowa in the mid-2030s, after SOO Green’s targeted commercial operation in 2032. ONE Nuclear and SOO Green remain separate and independent projects, and SOO Green is planned as an open-access transmission facility available to a broad range of generation resources and offtakers.
About ONE Nuclear Energy Inc.
ONE Nuclear Energy Inc. (Nasdaq: ONEN) is an independent developer, owner and operator of large-scale energy projects powered by natural gas and advanced nuclear technologies. Its projects aim to deliver reliable power and energy solutions for variable load, strengthen energy security, and support American digital and industrial growth. Learn more at www.onenuclearenergy.com.
About SOO Green
SOO Green is a 2,100-megawatt HVDC underground transmission project being developed by energyRe and Copenhagen Infrastructure Partners (CIP). The 350-mile line will connect Mason City, Iowa, to Yorkville, Illinois, along existing railway right-of-way, interconnecting the MISO and PJM markets and delivering affordable, reliable power to approximately 1.5 million Illinois homes. The project is partnered with Siemens Energy, Jingoli Power, PPL Corporation and Prysmian Group.
Forward-Looking Statements
This press release contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Forward-looking statements include every statement that is not a statement of historical fact, including statements about the LOI and any future agreements with SOO Green; the planned Iowa project, its capacity, technology, licensing and timing; the development, permitting, construction and commercial operation of the SOO Green line; access to transmission capacity and to the PJM market; market conditions, demand and capacity prices; and state and federal policy. Words such as “target,” “plan,” “expect,” “intend,” “contemplate,” “explore,” “may,” “will,” “could,” “potential” and similar expressions identify them.
| 3 |
Forward-looking statements are based on the Company’s current assumptions and are subject to risks and uncertainties that could cause actual results to differ materially, including: that the LOI is non-binding and non-exclusive, does not allocate or reserve transmission capacity, and may not lead to definitive agreements; that the SOO Green line, which is developed by third parties, may not be completed on its planned schedule or at all; the Company’s early stage of development, limited operating history and lack of revenue; that no power purchase agreement has been signed; the availability and cost of land rights, water, permits, interconnection and transmission service, and the ability of an Iowa resource to qualify as capacity in PJM; the licensing, cost, technology readiness and timing of advanced nuclear reactors; construction, schedule and cost risk; the ability to obtain financing on acceptable terms and resulting dilution; changes in law, policy, market rules and tax incentives; and the other risks described under “Risk Factors” in the Company’s filings with the U.S. Securities and Exchange Commission (SEC).
Forward-looking statements speak only as of the date of this press release. Except as required by law, the Company undertakes no obligation to update them, and readers should not place undue reliance on them. Industry, market and third-party data in this press release are taken from the publications of the organizations named; the Company has not independently verified them. Information about SOO Green is provided by SOO Green.
Sources
(1) Iowa Utilities Commission, “Wind Energy,” Five-Year Profile (wind supplied 62.84% of Iowa’s electricity generation in 2024), iuc.iowa.gov/regulated-industries/wind-energy; Office of the Governor of Iowa, Executive Order 17 establishing the Iowa Nuclear Energy Task Force, January 5, 2026, governor.iowa.gov; Iowa Nuclear Energy Task Force, Final Report, September 2026 (chair’s letter, p. 6; recommendations 2 and 5, p. 8), governor.iowa.gov/media/590/download; Iowa Acts 2026, Chapter 1146 (House File 2757), approved June 1, 2026, legis.iowa.gov/docs/publications/iactc/91.2/CH1146.pdf; Iowa Department of Revenue, “IDR Announces New Sales Tax Bills Signed into Law, Effective July 1,” July 2, 2026, revenue.iowa.gov.
(2) energy.gov/edf/duane-arnold (U.S. Department of Energy, Office of Energy Dominance Financing, “Duane Arnold”; loan closed September 2026)
(3) SOO Green HVDC Link, project information, www.soogreen.com, and SOO Green’s announcement of its letter of intent with ONE Nuclear.
(4) PJM Interconnection, “PJM Capacity Auction Procures 138,318 MW of Generation Resources as Work Continues To Address Growing Electricity Demand,” July 14, 2026 (2028/2029 auction cleared at its $325 per megawatt-day price cap, 6,831 MW short of the reliability requirement), insidelines.pjm.com.
(5) Illinois Commerce Commission, Illinois Power Agency and Illinois Environmental Protection Agency, 2025 Resource Adequacy Study, Executive Summary, December 15, 2025, p. vii (PJM capacity shortfall projected from 2029), ipa.illinois.gov.
Contacts
For Media & Investors: Ann Anthony, ONE Nuclear Energy | ir@onenuclearenergy.com
# # #