Sibanye Stillwater Ltd 6-K, filed Apr 22, 2022
Sibanye Stillwater Ltd (SBSW)
6-K
2022-04-22
For: 2021-12-31
View Original
Added on
July 07, 2026
About this 6-K
Sibanye Stillwater Ltd filed this 6-K on April 22, 2022.
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 6-K

REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934
Dated 22 April 2022
Commission File Number 333-234096

Sibanye Stillwater Limited
(Translation of registrant’s name into English)

Constantia Office Park
Cnr 14th Avenue and Hendrik Potgieter Road
Bridgeview House, Ground Floor
Weltevreden Park, 1709
South Africa
(Address of principal executive office)

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F:
☒ Form 20-F | ☐ Form 40-F | ||||
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): ☐
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): ☐
Explanatory Note
This Form 6-K includes the exhibits containing the Technical Report Summaries for the material mining properties of Sibanye Stillwater Limited (“Sibanye-Stillwater”) in respect of its platinum group metals (“PGM”) operations in Southern Africa pursuant to Subpart 1300 of Regulation S-K under the Securities Act of 1933. The exhibits are filed herewith in order to be incorporated by reference into Sibanye-Stillwater’s annual report on Form 20-F for the year ended 31 December 2021.
| Exhibit No. | Description | |||||||
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorised.
| Sibanye Stillwater Limited | |||||||||||
| Date: 22 April 2022 | By: | /s/ Charl Keyter | |||||||||
| Name: | Charl Keyter | ||||||||||
| Title: | Chief Financial Officer | ||||||||||
Exhibit 96.2 TECHNICAL REPORT SUMMARY ON THE MATERIAL ASSETS OF THE MARIKANA OPERATIONS Situated near Brits, North West, South Africa 31 December 2021 Prepared by: Qualified Persons from Sibanye-Stillwater, PGM Operations Important Notices Mineral Resources and Mineral Reserves are declared as attributable to Sibanye-Stillwater Ltd (registrant). Sibanye-Stillwater operates the Marikana Operations and as such, may accrue benefits in addition to the income from the attributable portions of the Mineral Reserves. For transparency and because it is not possible to accurately separate the non-attributable interests in these models, the Life-of-Mine plan and financial analyses are given for the full Mineral Reserve. Wherever mention is made of “Marikana Operations”, for the purposes of this Technical Report Summary, it encompasses mining activities under Western Platinum Proprietary Limited, Eastern Platinum Limited and the Pandora JV (Sibanye-Stillwater) in the North West Province, South Africa unless specifically mentioned differently. Marikana Operations also Include the Precious Metals Refining facilities in Brakpan, Gauteng Province. In this document, a point is used as the decimal marker and the comma is used for the thousands separator (for numbers larger than 999) in the text. In other words, 10,148.32 denotes ten thousand one hundred and forty-eight point three two. The word ‘tonnes’ denotes a metric tonne (1,000 kg). The abbreviation “lb” denotes the weight in pounds in the sense understood in the USA. The Platinum, Palladium, Rhodium and Gold (4E) prices are quoted in US dollars per troy ounce (USD/oz.) or South African Rand per kilogram (ZAR/kg). 6E denotes a basket of PGM’s Platinum, Palladium, Rhodium, Gold, Iridium and Ruthenium. Chrome refers to Chromium Oxide Cr2O3. • The paylimit (cm.g/t or g/t) of an operation is described as the average value or grade for that operation at which all direct and indirect costs are covered, i.e. the value at which it is estimated that ore can be mined without profit or loss. • The cut-off grade (cm.g/t or g/t) of an operation is described as the minimum value or grade at which an area can mine to maintain an average value in line with the paylimit. The cut-off is unique to the orebody being mined and is dependent on maintaining a mining mix that follows the orebody’s value distribution. Trademarks. Certain software and methodologies may be proprietary. Where proprietary names are mentioned TM or © are omitted for readability. This report contains statements of a forward-looking nature which are subject to some known and unknown risks, uncertainties and other factors that may cause the results to differ materially from those anticipated in this report. Date and Signature Page Qualified Persons Position Signature Signature Date Andrew Brown Vice President: Mine Technical Services /s/ Andrew Brown 14 April 2022 Manie Keyser Senior Manager Mine Planning and Resource Management /s/ Manie Keyser 14 April 2022 Nicole Wansbury Unit Manager Geology Mineral Resources Nicole Wansbury 14 April 2022 Brian Smith Unit Manager Survey /s/ Brian Smith 14 April 2022 Stephan Botes Unit Manager – Surface and Mineral Rights /s/ Stephan Botes 14 April 2022 Mandy Jubileus Environmental Manager /s/ Mandy Jubileus 14 April 2022 Dewald Cloete SVP Processing /s/ Dewald Cloete 14 April 2022 Makunga Daudet Seke Manager PGMs Sales and Metallurgical Accounting /s/ Makunga Daudet Seke 14 April 2022 Roderick Mugovhani SVP Finance /s/ Roderick Mugovhani 14 April 2022 4 Table of Contents 1 EXECUTIVE SUMMARY VI 1.1 INTRODUCTION VI 1.2 PROPERTY DESCRIPTION, MINERAL RIGHTS AND OWNERSHIP VI 1.3 GEOLOGY AND MINERALISATION VII 1.4 EXPLORATION STATUS, DEVELOPMENT, OPERATIONS AND MINERAL RESOURCE ESTIMATES VII 1.5 MINING METHODS, ORE PROCESSING, INFRASTRUCTURE AND MINERAL RESERVES 12 1.6 CAPITAL AND OPERATING COST ESTIMATES AND ECONOMIC ANALYSIS 15 1.7 PERMITTING REQUIREMENTS 16 1.8 CONCLUSIONS AND RECOMMENDATIONS 16 2 INTRODUCTION 18 2.1 REGISTRANT 18 2.2 COMPLIANCE 19 2.3 TERMS OF REFERENCE AND PURPOSE OF THE TECHNICAL REPORT 19 2.4 SOURCES OF INFORMATION 22 2.5 SITE INSPECTION BY QUALIFIED PERSONS 22 2.6 UNITS, CURRENCIES AND SURVEY COORDINATE SYSTEM 22 2.7 RELIANCE ON INFORMATION PROVIDED BY OTHER EXPERTS 24 3 PROPERTY DESCRIPTION 25 3.1 LOCATION AND OPERATIONS OVERVIEW 25 3.2 MINERAL TITLE 28 3.3 ROYALTIES 38 3.4 LEGAL PROCEEDINGS AND SIGNIFICANT ENCUMBRANCES TO THE PROPERTY 38 4 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY 38 4.1 TOPOGRAPHY, ELEVATION AND VEGETATION 38 4.2 ACCESS, TOWNS AND REGIONAL INFRASTRUCTURE 38 4.3 CLIMATE 39 4.4 INFRASTRUCTURE AND BULK SERVICE SUPPLIES 39 4.5 PERSONNEL SOURCES 39 5 HISTORY 41 5.1 OWNERSHIP HISTORY 41 5.2 PREVIOUS EXPLORATION AND MINE DEVELOPMENT 42 5.2.1 Previous Exploration 42 5.2.2 Previous Development 45 6 GEOLOGICAL SETTING, MINERALIZATION AND DEPOSIT 46 6.1 REGIONAL GEOLOGY 46 6.2 DEPOSIT TYPES 49 6.2.1 Formation of Deposit 49 6.2.2 Stillwater Complex 50
5 6.2.3 Norilsk Province 50 6.2.4 Sudbury Complex 50 6.2.5 The Great Dyke 51 6.2.6 The Bushveld Complex 51 6.3 LOCAL AND PROPERTY GEOLOGY 52 6.3.1 Stratigraphy 52 6.3.2 The Ore Bodies 54 6.3.3 Structure 58 6.3.4 Mineralogy 63 7 EXPLORATION 64 7.1 EXPLORATION DATA 64 7.2 GEOPHYSICAL SURVEYS 64 7.3 TOPOGRAPHIC SURVEYS 65 7.4 EXPLORATION AND MINERAL RESOURCE EVALUATION DRILLING 65 7.4.1 Overview 65 7.4.2 Planned Evaluation Drilling for 2021 66 7.4.3 Drilling Methods 69 7.4.4 Core Logging and Reef Delineation 76 7.5 SURVEY DATA 78 7.6 DENSITY DETERMINATION 79 7.6.1 Underground Drillholes and Channel Samples 79 7.6.2 Surface drillholes 80 7.6.3 Tailings Facility 80 7.7 UNDERGROUND MAPPING 81 7.8 HYDROLOGICAL DRILLING AND TESTWORK 81 7.9 GEOTECHNICAL DATA, TESTING AND ANALYSIS 81 7.9.1 Data Collection 81 7.9.2 Testing Methods 82 7.9.3 Geotechnical Rockmass Characterisation 83 7.9.4 Geotechnical Results and Interpretation 84 8 SAMPLE PREPARATION, ANALYSES AND SECURITY 86 8.1 SAMPLING GOVERNANCE AND QUALITY ASSURANCE 86 8.2 REEF SAMPLING – SURFACE 87 8.3 REEF SAMPLING – UNDERGROUND 88 8.3.1 Core Samples 88 8.3.2 Channel Sampling 88 8.4 SAMPLE PREPARATION AND ANALYSIS 89 8.4.1 Laboratory 89 8.4.2 Sample Preparation and Analysis 89 8.4.3 QP Opinion 90 8.5 ANALYTICAL QUALITY CONTROL 90 8.5.1 Nature and Extent of the Quality Control Procedures 90 8.5.2 Quality Control Results 91 6 8.5.3 QP Opinion 92 9 DATA VERIFICATION 92 9.1 DATA STORAGE AND DATABASE MANAGEMENT 92 9.2 DATABASE VERIFICATION 93 9.2.1 Mapping 93 9.2.2 Drillholes 93 9.2.3 Channel Sampling 93 9.3 QP OPINION 94 10 MINERAL PROCESSING AND METALLURGICAL TESTWORK 94 11 MINERAL RESOURCE ESTIMATES 95 11.1 ESTIMATION DOMAINS 95 11.1.1 Compositing 95 11.1.2 Estimation Domains 97 11.2 ESTIMATION TECHNIQUES 100 11.2.1 Grade and Tonnage Estimation 100 11.2.2 Grade Control and Reconciliation 112 11.3 MINERAL RESOURCE CLASSIFICATION 114 11.3.1 Classification Criteria 114 11.3.2 Mineral Resource Technical and Economic Factors 117 11.4 MINERAL RESOURCE STATEMENTS 120 11.4.1 Mineral Resources 120 11.4.2 Mineral Resources per Mining Area (Inclusive Mineral Reserves) 125 11.4.3 Changes in the Mineral Resources from Previous Estimates (Inclusive of Mineral Reserves) 125 11.5 QP STATEMENT ON THE MINERAL RESOURCE ESTIMATION AND CLASSIFICATION 126 12 MINERAL RESERVE ESTIMATES 126 12.1 MINERAL RESERVE METHODOLOGY 126 12.2 MINE PLANNING PROCESS 127 12.3 HISTORICAL MINING PARAMETERS 128 12.4 SHAFT AND MINE PAYLIMITS 129 12.4.1 Paylimits 129 12.4.2 Modifying Factors and LoM plan 129 12.5 LOM PROJECTS 134 12.6 SPECIFIC INCLUSIONS AND EXCLUSIONS 134 12.6.1 Specific Exclusions 134 12.6.2 Specific Inclusion 134 12.7 MINERAL RESERVE ESTIMATION 134 12.8 SURFACE SOURCES 138 12.9 MINERAL RESERVES STATEMENT 138 12.10 MINERAL RESERVE SENSITIVITY 142 12.11 QP STATEMENT ON THE MINERAL RESERVE ESTIMATION 142 13 MINING METHODS 143 7 13.1 INTRODUCTION 143 13.2 SHAFT INFRASTRUCTURE, HOISTING AND MINING METHODS 146 13.2.1 Shaft Infrastructure 146 13.2.2 Hoisting 148 13.2.3 Mining Methods 148 13.3 GEOTECHNICAL ANALYSIS 150 13.3.1 Geotechnical Conditions 150 13.3.2 Stress and seismological setting 150 13.3.3 Regional and Local Support 150 13.4 MINE VENTILATION 151 13.5 REFRIGERATION AND COOLING 152 13.6 FLAMMABLE GAS MANAGEMENT 152 13.7 MINE EQUIPMENT 152 13.8 PERSONNEL REQUIREMENTS 153 13.9 FINAL LAYOUT MAP 153 14 PROCESSING AND RECOVERY 153 14.1 PROCESSING FACILITIES 153 14.2 CONCENTRATORS 154 14.2.1 K3 Mix Concentrator 156 14.2.2 K3 UG2 Concentrator 160 14.2.3 EPL Concentrator 163 14.2.4 K4 Concentrator 167 14.2.5 EPC Concentrator 170 14.2.6 BTT Concentrator 174 14.2.7 ETTP Concentrator 177 14.3 SMELTING AND REFINING 181 14.3.1 Smelter 181 14.3.2 Base Metal Refinery (BMR) 184 14.3.3 Precious Metal Refinery (PMR) 188 14.4 SAMPLING, ANALYSIS, METAL ACCOUNTING AND SECURITY 191 14.4.1 Concentrator Sampling and Metal Accounting 191 14.4.2 Smelter - Sampling and Metal Accounting 192 14.4.3 Base Metal Refinery – Sampling and Metal Accounting 193 14.4.4 Precious Metal Refinery – Sampling and Metal Accounting 194 14.5 QP OPINION ON PROCESSING 195 15 INFRASTRUCTURE 195 15.1 OVERVIEW OF INFRASTRUCTURE 195 15.2 TAILINGS STORAGE FACILITIES 198 15.3 POWER SUPPLY 199 15.4 BULK WATER, FISSURE WATER AND PUMPING 201 15.5 ROADS AND TRANSPORT INFRASTRUCTURE 201 15.6 EQUIPMENT MAINTENANCE 201 15.6.1 Surface Workshops 201 8 15.6.2 Underground Workshops 201 15.7 OFFICES, HOUSING, TRAINING FACILITIES, HEALTH SERVICES ETC. 202 15.8 QP OPINION ON INFRASTRUCTURE 202 16 MARKET STUDIES 202 16.1 CONCENTRATES AND REFINED PRODUCTS 202 16.2 METALS MARKETING AGREEMENTS 202 16.3 MARKETS 202 16.3.1 Introduction 202 16.3.2 Demand Summary 203 16.3.3 Supply Summary 204 16.4 METALS PRICE DETERMINATION 206 16.4.1 Exchange Rate 206 16.4.2 Platinum Group Metals Price Deck 206 16.4.3 Comparison to Previous Year’s Prices 207 17 ENVIRONMENTAL STUDIES, PERMITTING, PLANS, NEGOTIATIONS/ AGREEMENTS WITH LOCAL INDIVIDUALS OR GROUPS 208 17.1 SOCIAL AND COMMUNITY AGREEMENTS 208 17.1.1 Overview- Mine Community Development 208 17.1.2 LED Implementation Strategy 208 17.2 HUMAN RESOURCES 211 17.2.1 Introduction 211 17.2.2 Human Resources 211 17.2.3 Legislation 211 17.2.4 Human Resource Development (Training) 213 17.2.5 Remuneration Policies 215 17.2.6 Industrial Relations 215 17.2.7 Employment Equity and Women in Mining (WIM) 215 17.3 HEALTH AND SAFETY 218 17.3.1 Policies and Procedures 218 17.3.2 Statistics 218 17.3.3 Occupational Health and Safety Management 218 17.3.4 HIV/AIDS 218 17.4 TERMINAL BENEFITS 219 17.5 ENVIRONMENTAL STUDIES 219 17.5.1 Introduction 219 17.5.2 Baseline Studies 2012 221 17.5.3 Zone of Influence 224 17.5.4 Climate Change and Greenhouse Gas Emissions, Air Quality 228 17.5.5 Biodiversity Management 230 17.5.6 Water Use Strategy 232 17.5.7 Waste Management 242 17.5.8 Environmental Reporting 243 17.5.9 Closure Planning and Costs 245
9 17.6 QP OPINION 250 18 CAPITAL AND OPERATING COSTS 250 18.1 OVERVIEW 250 18.2 CAPITAL COSTS 250 18.3 OPERATING COSTS 252 18.3.1 Operating Costs by Activity 252 18.3.2 Operating Costs 252 18.3.3 Surface Sources Costs 252 18.3.4 Processing Costs 252 18.3.5 Allocated Costs 252 19 ECONOMIC ANALYSIS 254 19.1 INTRODUCTION 254 19.2 ECONOMIC ANALYSIS APPROACH 254 19.3 ECONOMIC ANALYSIS BASIS 254 19.4 TEM PARAMETERS 255 19.5 TECHNICAL ECONOMIC MODEL 255 19.6 DCF ANALYSIS 262 19.7 SUMMARY ECONOMIC ANALYSIS 263 19.8 QP OPINION 264 20 ADJACENT PROPERTIES 264 21 OTHER RELEVANT DATA AND INFORMATION 265 21.1 RISK ANALYSIS 265 21.1.1 Financial Accuracy 265 21.1.2 Risk to the Mineral Resources and Mineral Reserves 265 22 INTERPRETATION AND CONCLUSIONS 266 23 RECOMMENDATIONS 266 24 QUALIFIED PERSONS’ CONSENTS 267 25 REFERENCES 268 25.1 LIST OF REPORTS AND SOURCES OF INFORMATION 268 25.1.1 Publications and Reports 268 25.1.2 Spreadsheets and Presentations 269 26 GLOSSARY OF TERMS 269 27 RELIANCE ON INFORMATION PROVIDED BY THE REGISTRANT 270 10 Figure 1: Ownership and Company Structure for Marikana .................................................... 19 Figure 2: General Location of the Material Assets as at 31 December, 2021 ........................ 25 Figure 3: Marikana Operations ................................................................................................... 27 Figure 4: Plan Showing Mineral Right ......................................................................................... 36 Figure 5: Aeromagnetic Image Over Marikana Operations. .................................................. 43 Figure 6: Areas Covered by 3D Seismic Surveys (shown in green polygons) Relative to the Marikana-Schaapkraal-Pandora areas. ........................................................... 44 Figure 7: Geology of the Bushveld Complex ............................................................................ 47 Figure 8: Geology of the Western Limb of the Bushveld Complex, South Africa ................... 48 Figure 9: General Stratigraphic Column of the Rustenburg Layered Suite ............................ 49 Figure 10: General Stratigraphic Column of the Local Geological Succession..................... 53 Figure 11: Typical PGM Grade Distribution of different Merensky Reef Facies Types at Marikana .................................................................................................................... 54 Figure 12: Typical PGM Grade Distribution of Different UG2 Facies Types ............................. 56 Figure 13: Structure Map of Marikana ....................................................................................... 59 Figure 14: Section of Marikana S-N ............................................................................................ 59 Figure 15: Example of a Shallow Dipping Pothole Associated with the UG2 ......................... 62 Figure 16: Example of Deep Potholing Associated with the UG2 ........................................... 62 Figure 17: IRUP (red) Unconformably Cut Across the Layered Lithological Sequence. ........ 63 Figure 18: Reconciliation of Drillhole Data (no change from 2020) ........................................ 66 Figure 19: Overview of Exploration Planned for Marikana 4B Shaft ........................................ 68 Figure 20: Overview of Exploration Planned for Marikana Saffy and E3 Shafts...................... 68 Figure 21: Example of Diamond Drill Core ................................................................................ 69 Figure 22: Schematic Vertical Section of a Typical Surface Drillhole ...................................... 71 Figure 23: Configurations for Cover Drilling - Single Cover Drilling Layout (one-sided). ........ 73 Figure 24: Configurations for Cover Drilling - Double Cover Drilling Layout. .......................... 74 Figure 25: Ring Cover Configuration – Drilling and Sealing Order. .......................................... 75 Figure 26: Example of CRM Result Monitoring .......................................................................... 91 Figure 27: Example of Blank Result Monitoring .......................................................................... 92 Figure 28: Example of a Merensky Reef Composite Histogram ............................................... 96 Figure 29: Merensky Reef Geozones .......................................................................................... 98 Figure 30: UG2 Reef Geozones .................................................................................................. 99 Figure 31: Capping Analysis in Snowden Supervisor .............................................................. 101 11 Figure 32: Example of a Variogram Map ................................................................................ 104 Figure 33: Example of Variogram for 4E Grade and Thickness .............................................. 104 Figure 34: KNA for Block Sizes ................................................................................................... 107 Figure 35: KNA for Discretization............................................................................................... 107 Figure 36: KNA Number of Samples 50x50 Block Size ............................................................. 108 Figure 37: KNA Number of Samples 500x500 Block Size ......................................................... 108 Figure 38: Swath Plot Showing Block Model vs Data .............................................................. 110 Figure 39: Value difference plot for the UG2 Reef showing percentage difference 4E Grade 2019 versus 2020. .......................................................................................... 111 Figure 40: UG2 Reef 4E Grade Block Model. ........................................................................... 111 Figure 41: Merensky Reef 4E Grade Block Model. .................................................................. 112 Figure 42 : Mineral Resource Classification for the Marikana Merensky Reef ...................... 116 Figure 43: Mineral Resource Classification for the Marikana UG2 Reef ................................ 117 Figure 44: Mineral Resource Geological Loss Factors for Marikana UG2 Reef .................... 118 Figure 45: Conversion of Mineral Resource to Mineral Reserve ............................................ 124 Figure 46: Marikana Operations Mineral Resource Reconciliation ....................................... 126 Figure 47: Mineral Reserves Classification as at 31 December 2021- Merensky Reef .......... 136 Figure 48: Mineral Reserves Classification as at 31 December 2021- UG2 Reef .................. 137 Figure 49: The Marikana Operations Mineral Reserve Reconciliation at 31 December 2021 ........................................................................................................................... 142 Figure 50: Typical Merensky Reef Mine Layout ....................................................................... 144 Figure 51: Typical UG2 Reef Mine Layout ................................................................................ 145 Figure 52: 4B Shaft Layout Section ........................................................................................... 146 Figure 53: K3 & K3A Shaft Layout Section ................................................................................ 146 Figure 54: Rowland Shaft Layout Section ................................................................................ 147 Figure 55: Saffy Shaft Layout Section ....................................................................................... 147 Figure 56: E3 Shaft Layout Section ........................................................................................... 148 Figure 57: Schematic Diagram of the Underground Mining layout. ..................................... 149 Figure 58: Schematic diagram of the overall process flowsheet. ......................................... 154 Figure 59: A Simplified Block Flow Diagram of K3 Mix Concentrator .................................... 157 Figure 60: K3 Mix Concentrator Throughput Forecast ............................................................ 159 Figure 61: K3 Mix Concentrator Production and Recovery Forecast ................................... 159 Figure 62: A Simplified Block Flow Diagram of K3 UG2 Concentrator................................... 161 12 Figure 63: K3 UG2 Concentrator Throughput Forecast .......................................................... 162 Figure 64: K3 UG2 Concentrator Production and Recovery Forecast .................................. 163 Figure 65: A Simplified Block Flow Diagram of EPL Concentrator ......................................... 164 Figure 66: EPL Concentrator Throughput Forecast ................................................................. 166 Figure 67: EPL Concentrator Production and Recovery Forecast ........................................ 166 Figure 68: A Simplified Block Flow Diagram of K4 Concentrator ........................................... 167 Figure 69: K4 Concentrator Throughput Forecast .................................................................. 169 Figure 70: K4 Concentrator Production and Recovery Forecast .......................................... 170 Figure 71: A Simplified Block Flow Diagram of EPC Concentrator ........................................ 171 Figure 72: EPC Concentrator Throughput Forecast ................................................................ 173 Figure 73: EPC Concentrator Production and Recovery Forecast ....................................... 173 Figure 74: A Simplified Block Flow Diagram of BTT Concentrator .......................................... 175 Figure 75: BTT Concentrator Throughput Forecast ................................................................. 176 Figure 76: BTT Concentrator Production and Recovery Forecast ......................................... 177 Figure 77: A Simplified Block Flow Diagram of ETTP Concentrator ........................................ 178 Figure 78: ETTP Concentrator Throughput Forecast ............................................................... 180 Figure 79: ETTP Concentrator Production and Recovery ....................................................... 180 Figure 80: A Simplified Block Flow Diagram of the Smelter .................................................... 182 Figure 81: Smelter Throughput Forecast .................................................................................. 183 Figure 82: Smelter PGM Production and Recovery Forecast ................................................ 184 Figure 83: A Simplified Block Flow Diagram of the Base Metal Refinery ............................... 185 Figure 84: BMR Throughput Forecast ....................................................................................... 186 Figure 85: BMR PGM & Base Metal Production and Recovery Forecast .............................. 187 Figure 86: A Simplified Block Flow Diagram of the Precious Metals Refinery ....................... 188 Figure 87: PMR Throughput Forecast ....................................................................................... 190 Figure 88: PMR PGM Production and Recovery Forecast...................................................... 190 Figure 89: Locations of Major Surface Infrastructure at Marikana ........................................ 197 Figure 91: Schematic Layout of Six Power Points of Supply and Surface Infrastructure ...... 199 Figure 92 : Price trends 2000-2021 ............................................................................................ 206 Figure 93: Marikana Surface Water Zone of Influence ........................................................... 227 Figure 94: Marikana* SO2 emissions 2017-2021/Q1 ................................................................ 230 Figure 95: Marikana Water Use Summary ............................................................................... 233
13 Figure 96: Quaternary Catchment Area ................................................................................. 235 Figure 97: Potential sources of surface and groundwater contamination located on site and current operational status. ....................................................................... 236 Figure 98: Groundwater Monitoring Network Supporting the Marikana Operations .......... 239 Figure 99: Life of Mine Planning (2015) .................................................................................... 247 Figure 100: Graphical indication of the envisaged suite of land uses and/or cover types. ........................................................................................................................ 248 Figure 101: Potential Land Uses Post Closure .......................................................................... 249 i Table 1: Attributable Mineral Resources Exclusive of Mineral Reserves as at 31 December 2021 ........................................................................................................... 9 Table 2: Attributable Mineral Resources Inclusive of Mineral Reserves as at 31 December 2021 ......................................................................................................... 10 Table 3: Attributable Mineral Reserves as at 31 December 2021 ............................................ 14 Table 4: NPV (Post-tax) Relative to ZAR/4Eoz PGM Basket Prices at 5 % Discount Rate- Current Operations .................................................................................................... 15 Table 5: Twin Parameter NPV (Post-tax) Sensitivity at a 5% Discount Rate (Capital Costs) _Current Operations ....................................................................................... 15 Table 6: Twin Parameter NPV (Post-tax) Sensitivity at a 5% Discount Rate (Revenue, Operating Costs) _Current Operations .................................................................... 16 Table 7: Details of QPs Appointed by Sibanye-Stillwater ......................................................... 21 Table 8: Units Definitions .............................................................................................................. 23 Table 9: Technical Experts/Specialists Supporting the QPs ...................................................... 24 Table 10: Summary of Mineral Rights held for the Marikana Operations ............................... 29 Table 11: Mining Right Status Marikana ..................................................................................... 37 Table 12: Number of Permanent Employees ............................................................................ 39 Table 13: Origin of Employees .................................................................................................... 40 Table 14: Historical Development .............................................................................................. 41 Table 15: Historical Production and Financial Parameters ...................................................... 45 Table 16: Marikana Evaluation Drilling Costs ............................................................................. 67 Table 17: Quality Control in Drilling ............................................................................................ 78 Table 18: Summary of the material properties of the dominant hanging wall and footwall rock types .................................................................................................... 86 Table 19: Rock mass classes determined from RMR total ratings and meaning ................... 86 Table 20: Capping Values Applied to the Final Estimation Dataset ..................................... 101 Table 21: Capping Applied to the Merensky Variogram Data. ............................................ 102 Table 22: Capping applied to UG2 Reef Variogram Data. ................................................... 103 Table 23: Summary of Variogram Model Parameters ............................................................ 105 Table 24: Kriging Parameters .................................................................................................... 109 Table 25: Reconciliation of the Merensky and UG2 Reef Models per Shaft 2021/2022 ...... 113 Table 26: Reconciliation of the UG2 Reef Models per Shaft 2020/2021 ............................... 113 Table 27: Confidence Levels for Key Criteria for Mineral Resource Classification ............... 114 Table 28: Commodity Price and Exchange Rate Assumptions for Cut-off Calculations* ... 119 ii Table 29: 6E Prill Split Percentages Applied per Reef ............................................................. 119 Table 30:Parameters Used in the Cut- off Calculation for the MR and UG2 Reef ............... 120 Table 31:Cut-off Grades Calculated for the MR, UG2 Reef and Surface Operations. ....... 120 Table 32: Prill Split Mineral Resources (Inclusive of Mineral Reserves) ................................... 121 Table 33: Mineral Resources Exclusive of Mineral Reserves as at 31 December 2021 at 100% .......................................................................................................................... 122 Table 34: Attributable Mineral Resource Exclusive of Mineral Reserves as at 31 December2021 ........................................................................................................ 122 Table 35: Mineral Resources Inclusive of Mineral Reserves as at 31 December 2021 at 100% .......................................................................................................................... 123 Table 36: Attributable Mineral Resource Inclusive of Mineral Reserves as at 31 December 2021 ....................................................................................................... 123 Table 37: Mineral Resource Inclusive of Mineral Reserves per Mining Area as at 31 December 2021 at 100% ......................................................................................... 125 Table 38: Historical Mining Statistics by Section ...................................................................... 128 Table 39: Mineral Reserve Modifying Factors C2022 .............................................................. 130 Table 40: LoM Plans – Current Operations 2022-2031 ............................................................. 132 Table 41: LoM Plans – Current Operations 2032-2071 ............................................................. 133 Table 42: Prill Split and Recovery for Mineral Reserves ........................................................... 138 Table 43: Mineral Reserve as at 31 December 2021 at 100% ................................................ 138 Table 44: Attributable Mineral Reserve as at 31 December 2021 at 80.64% ........................ 139 Table 45: Mineral Reserve per Mining Area as at 31 December 2021 at 100% .................... 140 Table 46: Attributable Mineral Reserve per Mining Area as at 31 December 2021 at 80.64% ....................................................................................................................... 141 Table 47: Hoisting Capacities of the Marikana Shafts ............................................................ 148 Table 48: Major Mine Equipment ............................................................................................. 152 Table 49: Major Process Equipment Utilised at Concentrators .............................................. 155 Table 50: K3 Mix Feed Capacity .............................................................................................. 157 Table 51: K3 Mix Concentrator Production Forecast and Operational Data ...................... 158 Table 52: K3 UG2 Feed Capacity ............................................................................................. 161 Table 53: K3 UG2 Concentrator Production Forecast and Operational Data ..................... 162 Table 54: EPL Concentrator Feed Capacity ........................................................................... 164 Table 55: EPL Concentrator Production Forecast and Operational Data ........................... 165 Table 56: K4 Concentrator Feed Capacity ............................................................................. 168 iii Table 57: K4 Concentrator Production Forecast and Operational Data ............................. 169 Table 58: EPC Concentrator Feed Capacity .......................................................................... 171 Table 59: EPC Concentrator Production Forecast and Operational Data .......................... 172 Table 60: BTT Concentrator Feed Capacity ............................................................................ 175 Table 61: BTT Concentrator Production Forecast and Operational Data ............................ 175 Table 62: ETTP Concentrator Feed Capacity .......................................................................... 178 Table 63: ETTP Concentrator Production Forecast and Operational Data .......................... 179 Table 64: Smelter Feed Capacity ............................................................................................ 182 Table 65: Smelter Production Forecast and Operational Data ............................................. 183 Table 66: BMR Feed Capacity ................................................................................................. 185 Table 67: Base Metals Refinery Production Forecast and Operational Data ...................... 186 Table 68: PMR Feed Capacity ................................................................................................. 188 Table 69: Precious Metals Refinery Production Forecast and Operational Data ................ 189 Table 70: Primary Mass Measurements - Concentrators ........................................................ 191 Table 71: Primary Metal Accounting (Analytical Measurements) - Concentrators ............. 191 Table 72: Analytical Methods - Concentrators ....................................................................... 192 Table 73: Primary Mass Measurements - Smelter .................................................................... 192 Table 74: Primary Metal Accounting Streams - Smelter ......................................................... 192 Table 75: Analytical Methods - Smelter ................................................................................... 193 Table 76: Primary Mass Measurements - BMR ......................................................................... 193 Table 77: Primary Metal Accounting Streams _BMR ............................................................... 194 Table 78: Analytical Methods - BMR ........................................................................................ 194 Table 79: Primary Mass Measurements - PMR ......................................................................... 194 Table 80: Primary Metal Accounting Streams - PMR .............................................................. 195 Table 81: Analytical Methods - PMR ........................................................................................ 195 Table 82: Summary for Active Tailings Dams ........................................................................... 198 Table 83: LoM Assessment of Tailings Facilities ........................................................................ 199 Table 84: PGM Demand 2021 .................................................................................................. 204 Table 85: Platinum Supply 2021 ................................................................................................ 205 Table 86: Exchange Rates ........................................................................................................ 206 Table 87: PGM Deck Price Scenarios ....................................................................................... 207 Table 89: Comparison of Mineral Reserve Prices Current and Previous Year. ..................... 207
iv Table 90: SLP Projects for Marikana ......................................................................................... 209 Table 91: Undertaking and Guidelines .................................................................................... 212 Table 92: HDSA in Management as at the end December 2021 .......................................... 212 Table 93: Breakdown of Employee Profile as at the end December 2021 ........................... 212 Table 94: Employee Turnover ................................................................................................... 213 Table 95: Labour Unavailability and Absenteeism ................................................................. 213 Table 96: Marikana Total Employees – Snapshot Report for the Month December 2021 ... 217 Table 97: Marikana Total Contractors (excluding Ad-Hoc Contractors) .............................. 217 Table 98: Safety Statistics .......................................................................................................... 218 Table 99: Summary of Anticipated Environmental Impacts (revised EMP,2012) ................. 222 Table 100: Marikana tCO2e Emissions Inventory 2021............................................................ 229 Table 101: Biodiversity Priorities ................................................................................................. 231 Table 102: Average Hydraulic Conductivity Levels ................................................................ 234 Table 103: Raw Water Supply Sources Used for Mining Purposes ......................................... 237 Table 104: Agricultural Water Supply Sources not used for mining purposes ....................... 238 Table 105: Water Conservation and Demand Management Practices .............................. 240 Table 106: Environmental Monitoring and Reporting Periods ................................................ 243 Table 107: Environmental Authorizations Status 2021 ............................................................. 244 Table 108: Closure Components .............................................................................................. 246 Table 109: Historical and Forecast Capital Expenditure – Current Operations .................... 251 Table 110: Historical and Forecast Capital Expenditure – Current Operations .................... 251 Table 111: Historical and Forecast Operating Costs -Current Operations............................ 253 Table 112: Historical and Forecast Operating Costs -Current Operations............................ 253 Table 113: TEM Parameters ....................................................................................................... 255 Table 114: TEM – Mining, Processing, PGM’s Sold and Revenue, Cash Costs, Taxation, Capital Expenditure and Free Cash – 2022-2031 .................................................. 256 Table 115: TEM – Mining, Processing, PGM’s Sold and Revenue, Cash Costs, Taxation, Capital Expenditure and Free Cash – 2033-2071 .................................................. 258 Table 116: TEM – TEM – Unit Analysis (ZAR/4Eoz) – 2022-2031 ................................................. 260 Table 117: TEM – Unit Analysis (ZAR/4Eoz) – 2032-2071 ........................................................... 261 Table 118: NPV (Post-tax) at Various Discount Factors .......................................................... 262 Table 119: Twin Parameter NPV (Post-tax) Sensitivity at a 5% Discount Rate (Revenue, Operating Costs) _Current Operations .................................................................. 263 v Table 120: Twin Parameter NPV (Post-tax) Sensitivity at a 5% Discount Rate (Revenue, Capital Expenditure) – Current Operations ........................................................... 263 Table 121: NPV (Post-tax) Relative to ZAR/kg PGM Basket Prices at 5 % Discount Rate _Current Operations ................................................................................................ 263 Table 122: Adjacent Mines, Bushveld Complex, Western Limb ............................................. 264 Table 85: Financial Risks ............................................................................................................ 265 vi 1 Executive Summary 1.1 Introduction Sibanye-Stillwater is an independent international precious metals mining company with a diverse mineral asset portfolio comprising platinum group metals (PGM) operations in the United States and Southern Africa, gold operations and projects in South Africa, and copper, gold and PGM exploration properties in North and South America. It is domiciled in South Africa and listed on the Johannesburg Stock Exchange (JSE or JSE Limited) and New York Stock Exchange (NYSE). This Technical Report Summary covers Sibanye-Stillwater’s Marikana Operations (Marikana or the Operations). Marikana falls under the PGM Operations of the Southern African Region of Sibanye Platinum Proprietary Limited, trading as Sibanye–Stillwater Group (Sibanye-Stillwater). Marikana includes shafts, processing facilities and associated infrastructure (the Material Assets) located in the North West Gauteng Provinces, South Africa. As per Group Methodology, the combined Western Platinum Proprietary Limited (WPPL) and Eastern Platinum Proprietary Limited (EPPL) and Incwala Resources Mineral Resources and Mineral Reserves report 80.64% attributable. This report is the first Technical Report Summary for the Marikana Operations and supports the disclosure of the Mineral Resource and Mineral Reserve as at 31 December 2021. The Mineral Resource and Mineral Reserve were prepared and reported according to the United States Securities and Exchange Commission's (SEC's) Subpart 1300 of Regulation S-K. There has been no material change to the information between the effective date and the signature date of the Report. The effective date of the Mineral Resource and Mineral Reserve is 31 December 2021 and the Report date is 14 April 2022. 1.2 Property Description, Mineral Rights and Ownership The Marikana Operations are ongoing, established mine, ore processing plants and mineral beneficiation facilities extracting the Merensky and UG2 Reefs to produce PGMs and base metals. These are situated in the District Municipality of Bojanala Platinum (Madibeng Local Municipality), at latitude 25° 40' S and longitude 27° 34' E, near the town of Brits, in the North West Province of South Africa approximately 110km northwest of Johannesburg. The most direct routes to Marikana Operations include the N4 (dual carriage tarred road) from Pretoria or the R512 (regional dual carriage tarred road) from Johannesburg, which intersects with the N4. The Marikana Operations encompass several mining rights (Marikana MR’s) held by Western Platinum Proprietary Limited (WPPL), Eastern Platinum Proprietary Limited (EPPL) and the Pandora Joint Venture (Pandora JV).WPPL is the holder of four (4) mining rights in respect of the Marikana Operation under The Department of Mineral Resources and Energy (DMRE) reference numbers: NW30/5/1/2/2/106 MR, NW30/5/1/2/2/107 MR, NW30/5/1/2/2/161 MR and NW30/5/1/2/2/190 MR. NW30/5/1/2/2/106 MR and NW30/5/1/2/2/107 MR commenced on 4 September 2007 and expire on 3 September 2037. NW30/5/1/2/2/161 MR and NW30/5/1/2/2/190 MR commenced on 21 December 2006 and expire on vii 20 December 2036. EPPL is the holder of three (3) mining rights under DMRE reference numbers: NW30/5/1/2/2/109 MR, NW30/5/1/2/2/110 MR and NW30/5/1/2/2/111 MR. All three (3) mining rights held by EPPL commenced on 4 September 2007 and expire on 3 September 2037. The Pandora JV is the holder of two (2) mining rights under DMRE reference numbers: NW30/5/1/2/2/292 MR and NW30/5/1/2/2/433 MR. Both mining rights held by the Pandora JV commenced on 23 January 2014 and expire on 22 January 2044. The Mineral Rights cover and area of 272km2. Eastern Tailings Storage Facility 1 is located within the area covered by the Mining Right held under NW30/5/1/2/2/109 MR on the farm of Turffontein 462JQ and is currently being re-mined. WPPL is also the holder of a Prospecting Right under DMRE reference number: NW30/5/1/1/2/12331 PR (Schaapkraal PR) which covers the western down-dip extension at Marikana. The Schaapkraal PR commenced on 22 August 2019 and will expire on 21 August 2022. A renewal application will be filed within H1 2022. There are no material legal proceedings in relation to the Marikana Operations. The Mining and Prospecting rights referred to in this document are issued in terms of the Section 5(1) of the Mineral and Petroleum Resources Development Act 28 of 2002 in South Africa. The principal terms and conditions are not materially different to other similar operations within the Republic of South Africa. 1.3 Geology and Mineralisation The Bushveld Complex is approximately 2,060 million years old and is a mafic to ultramafic rock sequence. The Rustenburg Layered Suite (RLS) is the world’s largest known mafic igneous layered intrusion containing about 80% of the world’s known reserves of PGM’s (Crowson,2001 quoted in Cawthorn, 2010). In addition to PGM’s, extensive deposits of iron, tin, chromium, titanium, vanadium, copper, nickel, and cobalt also occur. The Bushveld Complex extends approximately 450km east to west and approximately 250km north to south. It underlies an area of some 67,000km2, spanning parts of Limpopo, North West, Gauteng, and Mpumalanga Provinces. Interlayered in the Upper Critical Zone of the Bushveld Complex’s RLS, the Merensky and Upper Group No. 2 (UG2) Reefs are preserved as narrow tabular structures. The Marikana Operations are situated on the western limb of the Bushveld Complex and produce the PGMs and associated Base Metals from the mining and processing of the Merensky and UG2 Reefs. 1.4 Exploration Status, Development, Operations and Mineral Resource Estimates Exploration began at the Marikana Operations in the mid-1960s and during the past 51 years, several companies have conducted exploration campaigns across the operations. Underground development to exploit the Merensky Reef commenced in 1970 and mining of the UG2 Reef at Western Platinum commenced in 1982. Extensive mining, surface diamond drilling, 3D seismic surveys and complete airborne magnetic surveys have aided in establishing the geological characteristics of the UG2 and Merensky Reefs at Marikana. More than 900 surface diamond drillholes have been collared and drilled in prior years. Infill
viii drilling is on-going continuously to improve confidence and replenish the Measured and Indicated Mineral Resources. Direct observations include underground channel sampling and geological stope and pit mapping. Currently, there are five operating shaft complexes. Mining operations extend from a depth of 400m to 900m below surface (mbs). Initial geological understanding of the area was developed from observations made from surface and underground mapping, combined with exploration drillhole information and extrapolations of features observed in other platinum mines in the south-western Bushveld Complex. Current interpretations of the geological and structural framework applicable to the Merensky and UG2 Reefs have evolved as new and more detailed geological information and datasets were obtained. Geological Models and Mineral Resources at Marikana are based on surface and underground drillholes as well as underground channel samples. Surface diamond drillholes (DDH) were drilled to a maximum depth of 2,000m and have near vertical intersections with the reef horizons. Exploration holes were drilled on irregular grid intervals of 50m - 2,000m dependent on historical exploration strategy, depth of the mineralized horizons and geological uncertainty. The most fundamental control of the PGM mineralization is rock chemistry. PGMs are associated with thin (1-5m) chromitite layers and base metals sulphides. These layers are distinct and consistent over large distances. The Merensky Reef is the layer with the highest concentration of base metal sulphides and the highest concentration of PGM’s followed by the UG2 Reef. Estimation is constrained within both geologically homogenous structural and geozones and is derived from Ordinary Kriging (OK). Areas close to current workings will have smaller block sizes ranging from 50m to 100m. Areas further away will have block sizes ranging from 100m to 500m. The facies and structural models that form the basis of this report have evolved based on a large amount of data. The Mineral Resources are declared inside the structural blocks and outside the mined-out areas. The implemented grade control and reconciliation processes are considered appropriate. The Mineral Resources are in-situ estimates of tonnage and grades reported at a minimum mining width of 110cm, with dip and breast mining methods as employed at the operation. 9 Table 1: Attributable Mineral Resources Exclusive of Mineral Reserves as at 31 December 2021 2021 Classification – 4E PGM Tonnes (Mt) 4E Grade (g/t) 4E (Moz) Pt Pd Rh Au Pt Pd Rh Au 21-Dec 20-Dec 21-Dec 20-Dec 21-Dec 20-Dec (g/t) (g/t) (g/t) (g/t) (Moz) (Moz) (Moz) (Moz) Underground Measured (AI) 47.7 55.5 3.8 3.9 5.8 6.9 2.4 1.1 0.4 0.1 3.6 1.7 0.6 0.1 Measured (BI) Indicated (AI) 136.1 166.8 4.2 4.0 18.2 21.5 2.4 1.1 0.3 0.1 10.7 5.0 1.5 0.5 Indicated (BI) 256.5 288.5 4.0 4.2 32.9 38.9 2.3 1.1 0.3 0.1 19.0 9.2 2.9 0.9 Total Measured and Indicated 440.3 510.8 4.0 4.1 57.0 67.3 2.4 1.1 0.3 0.1 33.3 15.8 4.9 1.5 Inferred (AI) 15.5 16.8 4.1 4.4 2.0 2.4 2.7 1.2 0.3 0.1 1.4 0.6 0.2 0.1 Inferred (BI) 163.1 185.3 4.4 4.6 23.1 27.2 2.6 1.2 0.4 0.1 13.7 6.5 2.0 0.6 Total Underground 618.9 712.9 4.1 4.2 82.1 96.9 2.4 1.2 0.4 0.1 48.4 23.0 7.0 2.3 Total (AI) 199.4 239.1 4.1 4.0 26.1 30.8 2.4 1.1 0.3 0.1 15.7 7.3 2.2 0.7 Total (BI) 419.6 473.8 4.1 4.3 56.0 66.1 2.4 1.2 0.4 0.1 32.8 15.7 4.8 1.6 Surface Tailings Facility Indicated TSF 0.0 0.0 - - 0.0 0.0 - - - - 0.0 0.0 0.0 0.0 Total Surface 0.0 0.0 - - 0.0 0.0 - - - - 0.0 0.0 0.0 0.0 Total Resource 618.9 712.9 4.1 4.2 82.1 96.9 2.4 1.2 0.4 0.1 48.4 23.0 7.0 2.3 1. Mineral Resources are not Mineral Reserves. 2. Mineral Resources have been reported in accordance with the classification criteria of Subpart 1300 of Regulation S-K. 3. Attributable Mineral Resources is 80.64% of the total Mineral Resource for 2021 and 95.25% for 2020. 4. Mineral Resource is calculated on available blocks. Due to non-selective mining, no cut-off grade is applied.AI = Above Infrastructure; BI = Below Infrastructure 5. Mineral Resources Reported after the removal of Geological losses. 6. Quantities and grades have been rounded to one decimal place, therefore minor computational errors may occur. Values<0.5g/t at 0.5Moz report as zero. 10 Table 2: Attributable Mineral Resources Inclusive of Mineral Reserves as at 31 December 2021 2021 Classification – 4E PGM Tonnes (Mt) 4E Grade (g/t) 4E (Moz) Pt Pd Rh Au Pt Pd Rh Au 21-Dec 20-Dec 21-Dec 20-Dec 21-Dec 20-Dec (g/t) (g/t) (g/t) (g/t) (Moz) (Moz) (Moz) (Moz) Underground Measured (AI) 73.3 77.3 4.2 4.2 9.9 10.5 2.5 1.2 0.4 0.1 5.9 2.8 0.9 0.2 Measured (BI) Indicated (AI) 248.4 316.7 4.5 4.5 35.8 45.9 2.7 1.3 0.4 0.1 21.3 10.3 3.4 0.9 Indicated (BI) 256.5 288.5 3.9 4.2 32.0 39.1 2.3 1.1 0.4 0.1 19.0 9.2 3.1 0.8 Total Meas. &Ind. 578.2 682.5 4.2 4.4 77.7 95.6 2.5 1.2 0.4 0.1 46.2 22.3 7.4 1.9 Inferred (AI) 15.7 16.9 4.4 4.5 2.2 2.4 2.6 1.3 0.4 0.1 1.3 0.6 0.2 0.1 Inferred (BI) 163.1 185.3 4.4 4.6 22.9 27.2 2.6 1.3 0.4 0.1 13.7 6.6 2.2 0.5 Total Underground 757.0 884.7 4.2 4.4 102.9 125.2 2.5 1.2 0.4 0.1 61.4 29.5 9.8 2.5 Total (AI) 337.4 410.9 4.4 4.5 48.0 58.9 2.6 1.3 0.4 0.1 28.6 13.7 4.6 1.1 Total (BI) 419.6 473.8 4.1 4.4 54.9 66.4 2.4 1.2 0.4 0.1 32.7 15.8 5.2 1.2 Surface Tailings Facility Indicated TSF 8.4 11.5 1.2 1.2 0.3 0.4 0.7 0.3 0.1 0.0 0.2 0.1 0.0 0.0 Total Surface 8.4 11.5 1.2 1.2 0.3 0.4 0.7 0.3 0.1 0.0 0.2 0.1 0.0 0.0 Total Resource 765.5 896.2 4.2 4.4 103.2 125.7 2.5 1.2 0.4 0.1 62.2 29.6 8.9 2.8 1. Mineral Resources are not Mineral Reserves. 2. Mineral Resources have been reported in accordance with the classification criteria of Subpart 1300 of Regulation S-K. 3. Attributable Mineral Resources is 80.64% of the total Mineral Resource for 2021 and 95.25% for 2020. 4. Mineral Resource is calculated on available blocks. Due to non-selective mining, no cut-off grade is applied.AI = Above Infrastructure; BI = Below Infrastructure 5. Mineral Resources Reported after the removal of Geological losses. 6. Quantities and grades have been rounded to one decimal place, therefore minor computational errors may occur. Values<0.5g/t to 0.5Moz report as zero. 11
12 1.5 Mining Methods, Ore Processing, Infrastructure and Mineral Reserves Marikana Operations are a large, established shallow to moderate depth PGM mine that is accessed from the surface through numerous incline and vertical shaft systems. There are six working shafts and four shafts currently on care and maintenance. The operation also includes eight concentrators processing underground and surface mine tailings, a smelter, base metals refinery and precious metals refinery. All facilities are in good condition. All the permanent infrastructure required to access and mine the LoM plan is already established and in use. The underground mining method across Marikana Operations is predominantly conventional, using dip mining, breast mining or a combination of both. The mining method used is dependent on the ground conditions and structural complexity within each shaft block area. E3 Shaft is predominantly breast mining. The plan going into the future is to convert the other shafts from dip mining to breast mining. • Primary waste footwall haulages are developed on strike approximately 20 to 25m below the reef with crosscuts 70m apart. The reef is accessed from a short crosscut through an inclined travelling way. The raises are the main access to the stopes. On a dip layout, the ore is extracted from two 14m wide half panels on either side of the raise line. Mining blocks are separated by dip pillars with pillar width increasing with depth below the surface. • For breast mining, footwall haulages are placed deeper in the footwall in order to accommodate a crosscut and short travelling way to reef per raise line. Raises are placed between 120 and 150m apart. Breast panels are generally 25m in length and are advanced on strike away from the raises in either one or both directions. Ore is removed via advanced strike gullies, which connect the panels to the raise. • Stope widths average 1.4m. All mine designs, as well as strategic planning and any major design issues that are encountered, are performed in conjunction with qualified rock engineers and other technical specialists. The mining methods employed at Marikana are designed in line with the depth of mining on the basis of geotechnical engineering inputs, bearing in mind the mining width, depth of mining, and geology. Mine design is conducted in line with the mine and stability pillar design applicable to the area. The LoM production plans for Marikana Operations are developed through a Mineral Resource to Mineral Reserve conversion process that utilises modifying factors and mining (stoping and development) parameters as well as other modifying factors, informed by historical reconciliation results and performance. The use of modifying factors aligned to historical performance enhances the likelihood to achieve the mine plans. There are eight concentrators, a smelter and a base metals refinery on the Marikana property. There is a Precious Metals Refinery in Brakpan, east of Johannesburg. Marikana produces saleable products of Refined Platinum, Palladium, Rhodium, Gold as primary products with co-products Iridium and Ruthenium, Copper cathode, Nickel Sulphate Hexahydrate crystals and Chromium Oxide concentrate. 13 Two of the Tailings Storage Facilities (TSFs) will reach their capacity limits in 2025 and another two at around 2030. Additional storage capacity is needed from 2026 and is part of the capital outlay in the future. The tailings storage facilities are in good condition. Detailed LoM plans for every shaft complex at Marikana support the Mineral Reserve 14 Table 3: Attributable Mineral Reserves as at 31 December 2021 2021 Classification - 4E PGM Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Pt Pd Rh Au Pt Pd Rh Au Dec 21 Dec 20 Dec 21 Dec 20 Dec 21 Dec 20 (g/t) (g/t) (g/t) (g/t) (Moz) (Moz) (Moz) (Moz) Underground Proved 22.6 19.6 3.9 3.9 2.9 2.4 2.4 1.1 0.3 0.1 1.7 0.8 0.2 0.1 Probable 113.2 141.6 4.1 4.1 14.9 18.7 2.5 1.2 0.3 0.1 9.0 4.3 1.2 0.5 Total Underground 135.8 161.2 4.1 4.1 17.8 21.1 2.5 1.2 0.3 0.1 10.7 5.1 1.4 0.6 Surface Stockpiles Proved TSF) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Probable (TSF5,6) 8.4 11.5 0.9 1.2 0.2 0.4 0.5 0.3 0.1 0.0 0.1 0.1 0.0 0.0 Total Surface 8.4 11.5 0.9 1.2 0.2 0.4 0.5 0.3 0.1 0.0 0.1 0.1 0.0 0.0 Total Proved 22.6 19.6 3.9 3.9 2.9 2.4 2.4 1.1 0.3 0.1 1.7 0.8 0.2 0.1 Total Probable 121.6 153.1 3.9 3.9 15.1 19.1 2.3 1.1 0.3 0.1 9.1 4.3 1.2 0.5 Total Reserve 144.2 172.7 3.9 3.9 18.0 21.6 2.3 1.1 0.3 0.1 10.9 5.1 1.4 0.6 1. Mineral Reserve was reported in accordance with the classification criteria of Regulation S-K 1300. 2. Attributable Mineral Reserves 80.64% of the total Mineral Reserve for 2021 and 95.25% for 2020. 3. Mineral Reserve was estimated on all available blocks and no cut-off grade was applied. 4. Where Au grade is less than 0.05g/t the value will reflect as zero(0) in the table 5. Where Au is less than 0.05Moz the value will reflect as zero(0) in the table. 6. Mineral Reserves are estimated using the prices in Section 16.4. 7. Average Recovery factors for Merensky Reef and UG2 are 88% and 84% respectively. Total Average recovery is 86% for underground and 25,6% for DTSF. 15 1.6 Capital and Operating Cost Estimates and Economic Analysis The LoM plans for Marikana Operations provide appropriate capital expenditure budgets to cater for the sustainability of the operation. Sustaining capital costs are benchmarked to historical capital expenditure. Similarly, the forecast Operating Costs included in the LoM plans are based on historical experience at the operations and all Capital Expenditure and Operating Cost estimates have been conducted to a minimum study level of at least a Prefeasibility and have an accuracy level of ±25% and a contingency range not exceeding 15% or better. The budgeted Capital and Operating Costs, forecast metal prices and other economic assumptions utilised for economic viability testing of the LoM plans are reasonable. The post-tax flows for Marikana derive the Discounted Cash-Flow (DCF), results in the Net Present Values (NPVs) of the LoM plan contained in the table below at a Discount Rate of 5% as at 31 December, 2021. The tables also indicate the overall sensitivity of the NPV to the long-term 4E commodity price. Table 4: NPV (Post-tax) Relative to ZAR/4Eoz PGM Basket Prices at 5 % Discount Rate- Current Operations Long Term Price (ZAR/4Eoz) Sensitivity Range -20% -10% -5% 27,809 5% 10% 20% NPV@ the base case Discount Rate 5% (ZARm) 20,443 50,309 65,241 80,174 95,107 110,039 139,905 Table 5 shows the two-variable sensitivity analysis g the NPV Post-tax to the variance in Capital. Table 6 shows a two-variable sensitivity analysis of the NPV Post-Tax to variance in Revenue and in Operating Cost at the 5% Discount Rate. This demonstrates sensitivity to the increase in Operating Costs and the leverage potential to a higher 4E price. Table 5: Twin Parameter NPV (Post-tax) Sensitivity at a 5% Discount Rate (Capital Costs) _Current Operations Post-Tax NPV@5% Revenue Sensitivity Range (ZARm) -20% -10% -5% 0% 5% 10% 20% Capital cost sensitivity range -20% 22,363 52,229 67,161 82,094 97,027 111,959 141,825 -10% 21,403 51,269 66,201 81,134 96,067 110,999 140,865 -5% 20,923 50,789 65,721 80,654 95,587 110,519 140,385 0% 20,443 50,309 65,241 80,174 95,107 110,039 139,905 5% 19,963 49,829 64,761 79,694 94,627 109,559 139,425 10% 19,483 49,349 64,281 79,214 94,147 109,079 138,945 20% 18,523 48,389 63,321 78,254 93,187 108,119 137,985
16 Table 6: Twin Parameter NPV (Post-tax) Sensitivity at a 5% Discount Rate (Revenue, Operating Costs) _Current Operations Post-Tax NPV @ 5%(ZARm) Revenue Sensitivity Range -20% -10% -5% 0% 5% 10% 20% Total Operating Cost Sensitivity Range -20% 56,823 86,688 101,621 116,553 131,486 146,419 176,284 -10% 38,633 68,498 83,431 98,364 113,296 128,229 158,094 -5% 29,538 59,404 74,336 89,269 104,201 119,134 148,999 0% 20,443 50,309 65,241 80,174 95,107 110,039 139,905 5% 11,349 41,214 56,147 71,079 86,012 100,944 130,810 10% 2,254 32,119 47,052 61,984 76,917 91,850 121,715 20% (15,936) 13,929 28,862 43,795 58,727 73,660 103,525 While the profitability of the entire operation is tested on a total cost basis, the point at which each individual shaft closure is determined is after direct operational cost. As soon as a shaft does not contribute to its own mining and operational cost, it is considered for closure. The direct allocated costs include the overheads specific to the operation while indirect allocated costs refer to those items which belong to the entire group and which are allocated back to each operation based on a formula. 1.7 Permitting Requirements The Sibanye-Stillwater Marikana Operations have in place, all the necessary rights and approvals to operate; e.g. mines, processing plant, tailings Storage Facilities (TSFs), and ancillary facilities associated with the operations. Any permit and license infringements are corrected as they occur and environmental impacts are managed in close consultation with the appropriate departments. There are reasonable prospects that the operator’s tenure to operate on these premises is secure for the foreseeable future, unless terminated by regulatory authorities for other reasons. Furthermore, based on an assessment of the current permits, technical submittals, regulatory requirements and compliance history, continued acquisition of permit approvals should be possible. There is a low risk of rejections of permit applications by the regulatory agencies for the foreseeable future. 1.8 Conclusions and Recommendations The QPs have conducted a comprehensive review and assessment of all material issues likely to influence the future activities of the Marikana Operations based on information available up to 31 December 2021. There is a comprehensive Risk Register that is reviewed quarterly. All the risks have detailed mitigation plans designed to reduce the risk to a manageable level. The Qualified Persons could not identify any unmanaged material risks that would affect the Mineral Resources and Mineral Reserves reported for Marikana Operations. 17 The views expressed in this report have been based on the fundamental assumption that the required management resources and proactive management skills will be focused on meeting the LoM plans and production targets. There are no recommendations for additional work or changes. 18 2 Introduction 2.1 Registrant Sibanye-Stillwater Limited is an independent international precious metals mining company with a diverse mineral asset portfolio comprising platinum group metal (PGM) operations in the United States and Southern Africa, gold operations and projects in South Africa, and copper, gold and PGM exploration properties in North and South America. It is domiciled in South Africa and listed on the Johannesburg Stock Exchange (JSE or JSE Limited) and New York Stock Exchange (NYSE). This Technical Report Summary covers Sibanye-Stillwater’s Marikana Operations (Marikana or the Operations). Marikana falls under the PGM Operations of the Southern African Region of Sibanye Platinum Proprietary Limited, trading as Sibanye–Stillwater Group (Sibanye-Stillwater) (Figure 1). Marikana Operations include shafts, processing facilities and associated infrastructure (the Material Assets) located in the North West and Gauteng Provinces, South Africa. As per Sibanye-Stillwater Methodology, Western Platinum Proprietary Limited, Eastern Platinum Proprietary Limited, Incwala Resources Mineral Resources and Mineral Reserves report 80.64% attributable to the registrant (Figure 1). The methodology has changed from 2020, where the attributable shareholding was calculated at 95.25% to reflect changes in how the Black Economic Empowerment (BEE) participation is represented. 19 Figure 1: Ownership and Company Structure for Marikana 100% 100% 100% 76.4% 23.56% 76.4% 100% 18% 18% 92.5% 100% 7.5% 3.8% 3.8% 0.9% 0.9% 0.9% 0.9% Incwala Platinum Proprietary Limited Bapo Ba Mogale Mining Company Proprietary Limited Sibanye Stillwater Limited Sibanye Gold Limited Pandora Joint Venture Western Platinum Proprietary Limited Incwala Resources Proprietary Limited Eastern Platinum Limited Sibanye Platinum Proprietary Limited Rustenburg Eastern Operations Proprietary Limited Lonplats Siyakhula Employee Profit Share Scheme Trust Western Community Trust Bapo Ba Mogale Community Trust 2.2 Compliance Sibanye-Stillwater is listed on the NYSE (Code SBSW) and the JSE (Code SSW). Mineral Resources and Mineral Reserves contained in this Technical Report Summary were compiled and reported following the United States Securities and Exchange Commission's (SEC's) Subpart 1300 of Regulation S-K. 2.3 Terms of Reference and Purpose of the Technical Report This Technical Report Summary for the Sibanye-Stillwater Marikana Operations reports the Mineral Resources and Mineral Reserves estimates as at 31 December 2021. The Marikana Operations are an ongoing, established mine and ore processing plants extracting PGM’s from the UG2 and Merensky Reefs of the Bushveld Complex. The ore is processed on site at seven processing plants and produces a PGM and base metal concentrate. The concentrate is sent to the Base Metal Refinery (BMR) where base metals (nickel and copper) are removed and the resulting PGM-rich residue is sent to the offsite
20 Precious Metal Refinery (PMR) in Brakpan (Gauteng) for final treatment; the PMR is owned by Sibanye- Stillwater ( Figure 1). This report is the first Technical Report Summary for the Sibanye-Stillwater Marikana Operations prepared under the SEC's Subpart 1300 of Regulation S-K disclosure requirements. The PGM rich layers mined are well known from extensive mining which has taken place, at Rustenburg and the greater Bushveld Complex, over the last 90 years. The Mineral Resource for Marikana contained in this Technical Report Summary is estimated from the extensive surface and underground drillhole and sampling database and is signed-off by internal Qualified Persons (QP). These Mineral Resources are the basis for the Mineral Reserve estimates reported for the operation. Furthermore, the Mineral Reserve estimates are based on detailed Life of Mine (LoM) plans and technical studies (at least to a Prefeasibility Study level) completed internally by Sibanye-Stillwater personnel utilizing modifying factors and Capital and Operating Costs informed by the historical performance at the operations. This Technical Report Summary was compiled by in-house QPs for Mineral Resources and Mineral Reserves appointed by Sibanye-Stillwater. The QPs are Technical Experts/Specialists registered with professional bodies that have enforceable codes of conduct (Table 7). 21 Table 7: Details of QPs Appointed by Sibanye-Stillwater Name Position Area of Responsibility Academic and Professional Qualifications Section Sign- off Andrew Brown Vice President: Mine Technical Services Qualified Person, Mineral Resources and Mineral Reserves – SA PGM Operations MSc Mining Engineering; FSANIRE F037 MSAIMM 705060 1-6, 15 Manie Keyser Senior Manager Mine Planning and Resource Management Qualified Person, Mineral Resources and Mineral Reserves – SA PGM Operations MEng Mining Engineering, GDE, NHD MRM, ND Survey SACNASP 400284/06 13,16, 17.1-17.4, , 20-25 Nicole Wansbury Unit Manager Geology Mineral Resources Qualified Person Mineral Resources – SA PGM Operations MSc Geology SACNASP 400060/11 GSSA No 965108 1.4,7-11 Brian Smith Unit Manager Survey Qualified Person Mineral Reserves – SA PGM Operations MEng MRM SAGC GPr MS 0218 1.5, 12 Stephan Botes Unit Manager – Surface and Mineral Rights Mineral Title LLB, LLM, Postgraduate Certificate in Prospecting and Mining Law, Postgraduate Certificate in Company Law I, Admitted Attorney of the High Court of RSA 1.7, 3.2,3.4 Mandy Jubileus Environmental Manager SA PGM Environmental Compliance MSc Environmental Management and Sciences , SACNASP 118956, SAATCA ISO14001 Lead Auditor E2167 17.5 Dewald Cloete SVP Processing Mineral Processing ND , NHD Extractive Metallurgy, SAIMM HD0968 14.1,14.2,14.5 Makunga Daudet Seke Manager PGMs Sales and Metallurgical Accounting Smelting and Refining PhD (Metallurgical Engineering), MEng (Metallurgical Engineering), MBA, PrEng (ECSA) 20040194 MSAIMM 702394 14.3,14.4,14.5 Roderick Mugovhani SVP Finance Financial Evaluation B,Comm Accounting, Post Graduate Diploma in Acc Education, MBA, Executive Management Programme, Certified Professional Accountant( SA. Management 1.6, 18, 19 22 Name Position Area of Responsibility Academic and Professional Qualifications Section Sign- off Development Programme ( MDP) SAIMM - South African Institute of Mining and Metallurgy SACNASP – South Africa Council for Natural Scientific Professions SAGC – South African Geomatics Council GSSA – Geological Society of South Africa SAATCA – South African Auditor and Training Certification Authority 2.4 Sources of Information Sibanye-Stillwater (the registrant) provided most of the technical information utilised for the preparation of this report. This information is contained in internal documents recording various technical studies undertaken in support of the current and planned operations, historical geological work and production performance at the Marikana Operations, and forecast economic parameters and assumptions. Other supplementary information was sourced from the public domain and these sources are acknowledged in the body of the report and listed in the References Section (Section 24). 2.5 Site Inspection by Qualified Persons The QPs for Mineral Resources and Mineral Reserves who authored this Technical Report Summary and the supporting Technical Experts/Specialists are all employees of Sibanye-Stillwater. By virtue of their employment, the QPs visit the Marikana Operations regularly while carrying out their normal duties. 2.6 Units, Currencies and Survey Coordinate System In the Republic of South Africa (RSA) metric units are used for all measurements and, therefore, the reporting of quantities are in metric units, unless otherwise stated. All the metal prices and costs are quoted in US Dollars (USD) or South Africa Rand (ZAR). An Exchange rate of 15.00ZAR/USD has been used in this document. The coordinate system employed for most of the surface and underground surveys and maps shown in this Technical Report Summary is based on the Gauss Conform Projection (UTM), Cape Datum, Transverse Mercator projection, Central Meridian 27 degrees (Y +0 X+3 100 000). This is the coordinate system used by the previous owners, Lonmin and data has not yet been converted to WGS84. Some regional-scale maps in this report may be referenced WGS84, Sibanye-Stillwater standard, or with Latitude and Longitude coordinates for ease of reading. Maps in WGS84 are annotated as such. Units of measurement used in this report are described in Table 8. 23 Table 8: Units Definitions Units Description cm centimetre(s) g gram(s), measure of mass g/cm3 density - grammes oper cubic centimetre g/t grams per tonne g/t grade grams per tonne ha hectares = 100m x 100m kg kilograms = 1000grams, measure of mass km kilometre(s) = 1000 metres km2 square kilometres, measure of area Koz or kozt kilo ounces= 1000 ounces (troy) kt kilotonnes ktpm kilotonnes per month litre Metric unit of volume = 1000cm3 m metre(s) m2 square metres m3/a cubic metres per annum mamsl elevation metres above mean seal level metre metric unit of distance mm millimetre(s) = metre/1000 Moz Million ounces (troy), measure of weight Mt Million metric tonnes Mtpa Million tonnes per annum MVA Million Volt-Amps(Watts) MW Megawatts oz Troy ounces = 31.1034768 grams ppb parts per billion ppm parts per million (grams/metric tonne) sec second t metric tonne = 1000 kilograms = 1.10231131 short ton tonnes metric tonnes = 1000 kilograms = 1.10231131 short ton USD United States Dollars 4Eoz troy ounces of Platinum, Palladium, Rhodium and Gold combined. lb pound USA = measure of weight WGS84 World Geographic System 1984- map projection system wt% weight percent ZAR South African Rand ZARm Million Rand
24 2.7 Reliance on Information Provided by Other Experts The QPs for Mineral Resources and Mineral Reserves have sought input from in-house Technical Experts/Specialists on aspects of the modifying factors for the disciplines outside their expertise. Marikana is a large engineering project and it is not possible for any one person to have the required expertise to comment on all aspects of the operation and inputs to the Mineral Resources and Mineral Reserves. Marikana and Sibanye-Stillwater employ a large team of technical experts and Specialist Service providers. The QPs consider it reasonable to rely upon the information provided by these experts. A list of the in-house Technical Experts/Experts and their areas of competency are summarized in Table 9. Table 9: Technical Experts/Specialists Supporting the QPs Name Position Area of Competency Academic Qualifications A Benson Manager: Human Resources Human Resources Management NDP Human Resources Management Braam Burger Manager Finance Financial Evaluation B.Com (Accounting and Information Science) R Craill Vice President: Engineering Infrastructure B. Eng Mechanical. Pr Eng R Cooper Vice President Tailings Engineering Tailings BSc Civil Engineering, GDE (Civil), Pr Eng S Durapraj Manager: Rock Engineering Rock Engineering B.A, MSc Mining Engineering, MSANIRE, AREC, COMRMC L Koorsse Unit Manager Survey Survey, Reporting and Historical Mining Factors MSCC, NHD Mine Survey, GDE Mining Eng, IMSSA PMS0134 E Malherbe Superintendent Geology Mineral Resource Estimation BSc (Hons) (Geology) SACNASP 400131/08 T Naude Unit Manager: Environment Rehabilitation and closure costs BA Geography and Environmental Studies M Neveling Senior Manager: Health and Safety Safety MO COC, MMDP, Ncert Safety H Olivier Manager Asset Management Equipment B. Eng. Mechanical (Hons), GCC: Mines & Works (5999). K Pillay EVP: Sales and Marketing Metal sales and Marketing BSc Eng (Chem), MSc Eng (Chem), MBA. T Phumo Executive Vice President (EVP): Stakeholder Relations (SA) Social and Labour BA Hons (Corp Comm), APR Diploma Project Management S Swanepoel Manager Occupational Hygiene and Ventilation Occupational Hygiene, Ventilation BSc.(Hons), MSc, MEC, NDSM, SAIOH (0309) 25 3 Property Description 3.1 Location and Operations Overview The Marikana Operations are located southwest of the town of Brits, in the North West Province of South Africa, approximately 110km northwest of Johannesburg, (Figure 2). Figure 2: General Location of the Material Assets as at 31 December, 2021 26 The Marikana Operations are surrounded by various mines, agricultural land and towns. Sibanye- Stillwater own Rustenburg and Kroondal Operations, border Marikana to the west and the Impala Platinum Holding Ltd’s Afplats Leeuwkop Platinum Mine Project is situated to the northeast. Refer to Figure 3 and Figure 4 for maps providing additional location details of Marikana. The Marikana Operations consists of five operating shafts, namely 4Belt Shaft, K3 Shaft, Rowland Shaft, Saffy Shaft and E3 Shaft details of which are provided in Table 10. The Mineral Resource is accessed from the surface using conventional underground mining methods. The 4Belt and E3 shallow incline shafts extend to depths of approximately 400m below surface, and the K3, Rowland and Saffy vertical shafts extend to depths of approximately 900m below surface. Marikana has some shafts under care and maintenance, namely Hossy Shaft, Newman Shaft, E1 Shaft and E2 Shaft. K4 shaft has been reviewed and replanned and forms part of the 2021 reserve statement; mining is planned to commence in quarter 2 of 2022. The 4Belt shallow incline and K3 and Rowland vertical shafts target both the Merensky Reef and UG2 Reef, whilst the E3 shallow incline and Saffy vertical shaft target only the UG2 Reef. The primary vertical shaft complexes account for the largest portion of the Mineral Reserves. Ore mined at the Marikana Operations is processed on-site at one of seven concentrators with a combined milling capacity of approximately 600,000tpm (Table 11, Section 14). The concentrate produced is delivered as a slurry to the smelter. The smelter filters, dries and melts the concentrate to extract PGMs and base metals from the gangue material. The Smelter produces a converter matte that contains the extracted PGMs and Base Metals. The converter matte is processed at the Base Metal Refinery to separate the Base Metals (Ni and Cu) from the PGMs. The PGM concentrate from the Base Metal Refinery is processed at the Precious Metals Refinery in Brakpan, where it is refined into the individual PGM metals (Pt, Pd, Au, Rh, Ru & Ir). 27 Figure 3: Marikana Operations
28 3.2 Mineral Title The Mining and Prospecting rights referred to in this document are issued in terms of the Section 5(1) of the Mineral and Petroleum Resources Development Act 28 of 2002 in South Africa. The principal terms and conditions are not materially different to other similar operations within South Africa. The Marikana Operations encompass several mining rights held by Western Platinum Proprietary Limited (WPPL), Eastern Platinum Proprietary Limited (EPPL) and the Pandora Joint Venture (Pandora JV), all of which are subsidiaries of Sibanye-Stillwater. The Mining Right authorizes the WPPL, EPPL and Pandora JV to mine and extracts various minerals, including Platinum Group Metals. A summary of the Mining Rights for Marikana is given in Table 10 and Figure 4. The Mining Right covers a mining area totalling approximately 263 km2 in the District Municipality of Bojanala Platinum within the Madibeng and Rustenburg Local Municipalities) in the North West Province, as indicated in Figure 2 and Figure 4. The Mining Right comprises various farms (or portions thereof). The names of the farms for the Marikana Operations are listed in Table 11. The Rustenburg Operations have sufficient rights and access to land to conduct operations. The current list of farms as well as deed and size details are incomplete and Sibanye-Stillwater is in the process of rectifying outstanding Mineral Title documentation for the properties acquired in 2019. Eastern Tailings Storage Facilitiy1 is located within the area covered by the Mining Right held under NW30/5/1/2/2/109 MR on the farm Turffontein 462JQ and is currently being re-mined. WPPL is also the holder of a Prospecting Right under DMRE reference number: NW30/5/1/1/2/12331 PR (Schaapkraal PR) which covers the western down-dip extension at Marikana. The Schaapkraal PR commenced on 22 August 2019 and will expire on 21 August 2022. A renewal application will be filed within H1 2022. 29 Table 10: Summary of Mineral Rights held for the Marikana Operations Right Holder Right Number/s Size (ha) Minerals Key Permit Conditions Expiry date Future Requirements Future Intentions Brief summary of Violations/ fines Western Platinum Limited NW30/5/1/2/2/106MR 10,167.79 PGMs, Gold, Silver, Nickel, Copper, Cobalt, Chrome, Vanadium, Iron Ore, Sulphur, Selenium, Tellurium See the summary of permit conditions, general EMP regulatory reporting requirements and SLP regulatory reporting requirements. 03-Sep-37 No specific requirements apart from standard reporting requirements. N/A None. Western Platinum Limited NW30/5/1/2/2/107MR 2,931.43 PGMS and Associated Metals See the summary of permit conditions, general EMP regulatory reporting requirements and SLP regulatory reporting requirements. 03-Sep-37 No specific requirements apart from standard reporting requirements. N/A None. Eastern Platinum Limited NW30/5/1/2/2/109MR 3,817.71 PGMs & (Gold, Silver, Nickel, Copper, Cobalt, Chrome, Vanadium, Iron Ore, Sulphur, Selenium, Tellurium in the UG2 and Merensky Reefs) See the summary of permit conditions, general EMP regulatory reporting requirements and SLP regulatory reporting requirements. 03-Sep-37 No specific requirements apart from standard reporting requirements. N/A None. Eastern Platinum NW30/5/1/2/2/110MR 61.92 PGMs, Gold, Silver, Nickel, See the summary of permit conditions, 03-Sep-37 No specific requirements apart N/A None. 30 Right Holder Right Number/s Size (ha) Minerals Key Permit Conditions Expiry date Future Requirements Future Intentions Brief summary of Violations/ fines Limited Copper, Cobalt, Chrome, Vanadium, Iron Ore, Sulphur, Selenium, Tellurium general EMP regulatory reporting requirements and SLP regulatory reporting requirements. from standard reporting requirements. Eastern Platinum Limited NW30/5/1/2/2/111MR 168.79 PGMs See the summary of permit conditions, general EMP regulatory reporting requirements and SLP regulatory reporting requirements. 03-Sep-37 No specific requirements apart from standard reporting requirements. N/A None. Western Platinum Limited NW30/5/1/2/2/161MR 175.01 PGMs and Associated Metals and Minerals including (Gold, Silver, Nickel, Copper, Cobalt, Chrome See the summary of permit conditions, general EMP regulatory reporting requirements and SLP regulatory reporting requirements. 20-Dec-36 No specific requirements apart from standard reporting requirements. N/A None. Western Platinum Limited NW30/5/1/2/2/190MR 34.31 PGMs and Associated Metals and Minerals including (Gold, Silver, Nickel, Copper, Cobalt, Chrome See the summary of permit conditions, general EMP regulatory reporting requirements and SLP regulatory reporting requirements. 20-Dec-36 No specific requirements apart from standard reporting requirements. N/A None. Western NW30/5/1/1/2/12331P 4174.142 PGMs, Chrome, "The holder must 21-Aug-22 A prospecting right Renew the None 31 Right Holder Right Number/s Size (ha) Minerals Key Permit Conditions Expiry date Future Requirements Future Intentions Brief summary of Violations/ fines Platinum Limited R 4 Gold, Silver, Copper, Cobalt, Iron Ore, Sulphur, Vanadium and Nickel commence with prospecting operations within 120 days from when the prospecting right is effective. renewal application to be submitted before 27 May 2022 prospecting right for a further three years Pandora JV NW30/5/1/2/2/292MR 4,622.48 PGMs, Gold, Silver, Copper, Cobalt, Chrome and Nickel together with any such metals and minerals which may be extracted in the normal mining of the minerals in and on the properties. See the summary of permit conditions, general EMP regulatory reporting requirements and SLP regulatory reporting requirements. 22-Jan-44 No specific requirements apart from standard reporting requirements. N/A None. Pandora JV NW30/5/1/2/2/433MR 4,289.81 PGMs, Gold, Silver, Copper, Cobalt, Chrome and Nickel together with any such metals and minerals which may be extracted in the normal mining of the minerals in and on See the summary of permit conditions, general EMP regulatory reporting requirements and SLP regulatory reporting requirements. 22-Jan-44 No specific requirements apart from standard reporting requirements. N/A None.
32 Right Holder Right Number/s Size (ha) Minerals Key Permit Conditions Expiry date Future Requirements Future Intentions Brief summary of Violations/ fines the properties. 33 Key permit conditions are given below; 1. Mining right renewal applications to be submitted 60 working days prior to the date of expiry of the right. 2. Holder of MR must continue with mining operations, failing which the right may be suspended or cancelled. 3. The terms of the right may not be varied or amended without the consent of the Minister of Mineral Resources and Energy. 4. The Holder shall be entitled to abandon or relinquish the right or the area covered by the right entirely or in part. Upon abandonment or relinquishment, the Holder must: 4.1. Furnish the Regional Manager with all prospecting and/or mining results and/or information, as well as the general evaluation of the geological, geophysical and borehole data in respect of such abandoned area; and 4.2. Apply for a closure certificate in terms of section 43(3) of the MPRDA. 5. The holder shall pay royalties to the State in accordance with section 25(2)g of the MPRDA throughout the duration of the mining right. 6. Mining Operations must be conducted in accordance with the Mining Work Programme and any amendment to the MWP and an approved EMP. 7. The holder shall not trespass or enter into any homestead, house or its curtilage nor interfere with or prejudice the interests of the occupiers and/or owners of the surface of the Mining Area except to the extent to which such interference or prejudice is necessary for the purposes of t enabling the Holder to properly exercise the Holder’s rights under the mining right. 8. The holder must dispose of all minerals derived from mining at competitive market prices which shall mean in all cases, non-discriminatory prices or non-export parity prices. 9. A shareholding, an equity, an interest or participation in the mining right or joint venture, or a controlling interest in a company/JV may not be encumbered, ceded, transferred, mortgaged, let, sublet, assigned, alienated or otherwise disposed of without the written consent of the Minister, except in the case of a change of controlling interest in listed companies. 10. All boreholes, shafts, adits, excavations and openings created by the holder shall be sealed, closed, fenced and made safe in accordance with the approved Environmental Management Programme and the Mine Health and Safety Act. 11. The holder of the mining right, while carrying out mining operations should safeguard and protect the environment, the mining area and any person using to entitled to use the surface of the mining area for possible damage or injury. 34 12. The Minister or a person authorized by the Minister shall be entitled to inspect the Mining Area and the execution of the approved mining right conditions. 13. A mining right may be cancelled or suspended subject to S47 of the MPRDA if the holder: 13.1. Submits inaccurate, incorrect and/or misleading information in connection with any matter required to be submitted under this Act; 13.2. fails to honour or carry out any agreement, arrangement or undertaking, including the undertaking made by the Holder in terms of the Broad Based Socio Economic Empowerment Charter and Social and Labour Plan; 13.3. Breaches any material term and condition of the mining right; 13.4. Conducts mining in contravention of the MPRDA; 13.5. Contravenes the requirements of the approved Environmental Management Programme; 13.6. Contravenes any provisions of this Act in any other manner. 14. The holder shall submit monthly returns contemplated in S 28 (2) A of the MPRDA no later than the 15th of every month and maintain all such books, plans and records in regard to mining on the mining area as may be required by the Act. 15. The Holder shall, at the end of each year, following commencement of this mining right, inform the Regional Manager in writing of any new developments and of the future mining activities planned in connection with the exploitation/mining of the minerals in the mining area. 16. Provisions relating to section 2(d) and section 2(f) of the MPRDA, relating to the Broad Based Socio Economic Empowerment Charter differs in each mining right. 17. The Mining right does not exempt the holder from complying with the MHSA or any Act in South Africa. 18. Annually, no later than three months before financial year end submit a detailed implementation plan to give effect to Regulation 46(e)(i), (ii) and (iii) in line with the Social and Labour Plan. 19. Annually, no later than three months after finalization of its audited annual report submit a detailed report on the implementation previous year’s SLP. SLP COMPLIANCE REQUIREMENTS 20. New Social and Labour Plan to be submitted and reviewed every 5 years. 21. Social and Labour Plan Implementation Plans to be submitted annually. 22. Social and Labour Plan Annual Report to be submitted annually. ENVIRONMENTAL MANAGEMENT COMPLIANCE REQUIREMENTS 35 23. Performance assessment relating to Environmental Management Programme to be conducted Bi-annually. 24. Performance assessment relating to Water Use License to be conducted annually. 25. Performance assessment relating to Atmospheric Emission License to be conducted annually.
36 Figure 4: Plan Showing Mineral Right 37 Table 11: Mining Right Status Marikana FARMS REGISTERED IN THE NAME OF WESTERN PLATINUM LIMITED Farm Name Portion Magisterial District No 342 JQ 17, 32, 43, 151, 209, 211, 253, 254, 255, 260, 261, 307 Rustenburg Elandsdrift 467 JQ RE*2, RE*20, RE*21, 37, 38, RE*39, 44, E*51, 52, 53, 56, 57, 58, 59, 70, 71, 99, 100, RE*137, RE*222 Madibeng Hoedspruit 298 JQ 12, 13, 14, 16 Rustenburg Lonmin Tailings 943 JQ RE Rustenburg Middelkraal 466 JQ RE*1, RE*2, RE*3, RE*4, RE*5, 7, 8, RE*9, 10, -20, RE*21, RE*22, RE*23, RE*24, 25, -36, RE*37, 38, RE*39, RE*40, RE*41, 43, 44, RE*45, 46-50, RE*51, 52, 53, 55, 56, RE*58, 60, 62, 63, 68, 69, 70 Madibeng Rooikoppies 297 JQ RE*1, RE*2, RE*5, 6, RE*8, RE*10, RE*16, 22, RE*24, RE*28, 35, RE*36, 37, 38, RE*39, RE*40, 41, 42, RE*43, RE*44, 48, RE*54, RE*55, RE*57, RE*58, 76, 77, 78, 97, 98, 99, 101, 102, 103, 104, 105, RE*114, RE*116, 118, RE*121, 122, RE*123, 124, 125, 134, 135, RE*136, 138, 139, 141, 142, 143, 146, 147, Rustenburg Rooikoppies 297 JQ RE*150, RE*151, 152, 153, 154 - 171, RE*173, 189, 194, 195, 198, 199, 200, 201, 202, RE*203, RE*204, RE*205, RE*206, RE*207, RE*213, RE*216, RE *217, RE*218, RE*219, RE*220, 221, 222, RE*223, 224, 225 - 228, RE*229, 231, 232, Rustenburg Rooikoppies 297 JQ RE*233, 243, 244, 247 - 252, RE*276, 277 - 283, RE*297, RE*307, RE*308, RE*314, RE*316, RE*318, RE*320, RE*322, RE*328, RE*329, RE*332, RE*333, 399, RE*415 Rustenburg Zwartkoppies 296 JQ 1, 4, 9, 10, 13, - 18, RE*19, 20, 24 - 27, RE*32, 33, 34, 39, 40, 45, RE*47, 49, 55, 58, 62, 64, 68, 69, 73, 81, 90, 91, 92, 102, RE*106, 114, 115, RE*116 Rustenburg Schaapkraal 292 JQ 21 Rustenburg FARMS REGISTERED IN THE NAME OF EASTERN PLATINUM LIMITED Farm Name Portion Magisterial District Hartebeespoort B 410 JQ 916, 920, 921, 1061, 1062, 1066, 1072, 1073, 1074, 1075, 1076, 1077 Madibeng Uitvalgrond 416 JQ RE*17, RE*18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28 Madibeng FARMS AND PORTIONS ON LEASE FROM BAPO BA MOGALE TRADITIONAL COMMUNITY Farm Name Portion Magisterial District Turffontein 462 JQ 3, RE Madibeng 460 JQ 1 Madibeng Karee Poort 407 JQ 6 Madibeng Modderspruit 461JQ 2 Madibeng Boschfontein 458 JQ 5 Madibeng Wonderkop 400 JQ 1, 2 Madibeng 38 3.3 Royalties Sibanye-Stillwater Marikana Operation is not a royalty company nor receives royalties from any other operation. 3.4 Legal Proceedings and Significant Encumbrances to the Property The QPs have been advised by Sibanye-Stillwater that there are no material legal proceedings in relation to the Marikana Operations. It should, however, be noted that Sibanye-Stillwater may be involved in various non-material legal matters such as employment claims, third-party subpoenas and collection matters on an ongoing basis, which are not material to the Mineral Resources and Mineral Reserves reported for the Marikana Operations in this Technical Report Summary. From the documentation reviewed and input by the relevant Technical Specialists and Experts, the QPs could not identify any material factors or risks with regards to the title permitting, surface ownership, environmental and community factors that would prevent the mining of the reefs and the declaration and disclosure of the Mineral Resources and Mineral Reserves for the Marikana Operations. 4 Accessibility, Climate, Local Resources, Infrastructure and Physiography 4.1 Topography, Elevation and Vegetation The Madibeng Local Municipality within which the Marikana Operations are situated is characterized by undulating terrain, varying between 1,050 metres above mean sea level (mamsl) and 1,180 mamsl. The topography to the north, west and east of Marikana Operations is dominated by well-established non-perennial watercourses. The mine area is relatively flat with sporadic hillocks and rocky outcrops. Situated to the south is the Magaliesburg mountain range and to the east are several small hills. The major rivers in the Marikana Operations area include the Sterkstroom River bisecting through the western section of the operation and the Maretlwana River on the eastern portion of the operation. The vegetation present in the area is relatively heterogeneous, consisting of a mosaic of open grassland, old fallow lands, scrub-thornveld, mesophyllous woodland and drainage-line thickets and Norite koppies. The majority of the area, occurring on black clay soils, is open grassland with occasional small trees and denser treed zones where surface rock is present and more frost- and fire cover is provided to seedlings. The areas located on the sandier red soils are made up of mixed savanna, with both microphyllous (fine-leaved) and mesophyllous (broad-leaved) vegetation present. 4.2 Access, Towns and Regional Infrastructure The Marikana Operations are situated in between the City of Rustenburg and the town of Brits. The site is accessed via the multiple networks of well-maintained tarred roads. The operations are accessed via the N4 highway into Rustenburg and Brits from Pretoria. Refer to Sections 4.4 and 15 and Figure 2 for details on Infrastructure 39 4.3 Climate Rainfall occurs throughout the year, but predominantly between November and March, mainly as thunderstorms. Annual rainfall averages approximately 650mm. The wettest month is January, with an average monthly total rainfall of 132mm. The driest month is July; with an average monthly total rainfall of approximately 2mm. Mean annual air temperatures range from 11.8°C in June/ July to 23.8°C in January. Winds are mainly light to moderate and blow from the north-easterly sector, except for short periods during thunderstorms or weather changes when they have a southerly component. The lightning ground flash density in the area is a moderate risk to surface infrastructure with between 5 to 7 strikes/km2/year (on a scale of 0 to 19). No severe climatic effects influence mining activities and the mining and ore processing operations at the Marikana Operations proceed year round. 4.4 Infrastructure and Bulk Service Supplies Marikana Operations have been operating since 1987 and the surrounding mines have been operational since the 1950’s. All the regional and onsite infrastructure for mining is well established. There is a good supply chain for all required consumables and equipment in or near the mine site. The Marikana Operations, through Sibanye-Stillwater, is well connected to the international supply markets for any materials and equipment not available locally. The Marikana Operations are supplied with bulk electricity from the regional grid which is owned and operated by the state-owned company, Eskom. Details for Power are supplied in Section 15.3 and for Water supplies in Section 17.5.6. Madibeng Municipality and the neighbouring Rustenburg Municipality host a combined population of greater than 1.2m people and most services needed are found in the surrounding towns and cities. 4.5 Personnel Sources Marikana Operations have specific policies, procedures and practices in place, which address, on an integrated basis, its human resource requirements. Recruitment is predominantly informed by the operational requirements of the Marikana Operations for specific skills, by the extent of labour turnover levels and by relevant legislation. The organizational structure currently in place, together with operational management, will remain unchanged until planned shaft closures occur, following which downsizing will be assessed. Organizational structures and staffing requirements (Table 12) are primarily determined by operational requirements and the production profile of the operation. The economic climate, cost infrastructure and the Mineral Reserves profile also influence the organizational structures and required labour complement. Table 12: Number of Permanent Employees C2018 C2019 C2020 C2021 No. of Employees 22,934 20,173 18,447 17,963
40 Manpower is sourced from different areas of South Africa and beyond, although preference is given to manpower from local communities within the Northwest Province in support of local economic development. Table 13 provides a breakdown of the origin of employees as per province, including beyond the border of South Africa. Many of the Marikana Operations’ employees live in Rustenburg and neighbouring towns. Table 13: Origin of Employees Province Number of Permanent Employees Number of Contractors Percentage Eastern Cape 5,759 509 29% Free State 670 110 4% Gauteng 1,965 359 11% KwaZulu-Natal 562 72 3% Limpopo 922 382 6% Mpumalanga 329 97 2% North West 4,643 1,509 29% Northern Cape 197 23 1% Western Cape 13 6 0% Non-South Africans 2,903 346 15% Total 17,963 3,413 100% 41 5 History 5.1 Ownership History Marikana Operations were started in 1987 by Lonrho Plc/Lonmin Plc until the acquisition of Lonmin by Sibanye-Stillwater in 2019. The historical development of the Marikana Operations is summarized in Table 14. Table 14: Historical Development Company/Ownership/ Operator Date Activity Lonrho Plc 1909 London and Rhodesian Mining and Land Company founded Lonrho Plc 1987 The sinking of the Rowland Shaft commences Lonrho Plc 1989 Karee Mine Shafts operational Lonrho Plc 1991 The first production delivered by Rowland and steady-state achieved in 1999 Lonrho Plc 1998 Lonrho Plc splits and Lonrho Africa plc is formed Lonmin Plc 1999 Lonrho Plc is renamed Lonmin Plc. The focus is on mining Lonmin Plc 2000 Lonmin Plc sells off all non-PGM assets and becomes a primary PGM producer Lonmin Plc 2001 Eastern declines are sunk and the Saffy shaft is commissioned. Lonmin enters into a JV with Anglo American Platinum for the Pandora property Lonmin Plc 2003 Hossy Shaft is commissioned. Lonmin Plc 2005 Lonmin acquires the Limpopo Mine (formerly Messina) from Southern Platinum Lonmin Plc 2006 K4 Shaft is commissioned Lonmin Plc 2007 Lonmin acquires 94% of Afriore for a stake in the Akanani PGM project on the Northern Limb of the Bushveld Complex Lonmin Plc 2009 Lonmin’s Limpopo Mine is put on Care and Maintenance Lonmin Plc 2011 K3 Shaft decline is sunk. Lonmin Plc 2012 K4 Shaft is placed on Care and Maintenance. Major labour strike affected mine and reduced production. Lonmin Plc 2016 Saffy shaft produces at full capacity. Lonmin Plc 2017 Newman and E2 Shafts are put on Care and Maintenance. Lonmin Plc 2018 Lonmin acquires 100% of the Pandora project from Anglo American Platinum. Lonmin Plc 2019 Hossy, E1 and W1 Shafts are put on Care and Maintenance. UG2 open pit operations are ceased. Sibanye-Stillwater 2019 Acquisition of Lonmin Plc by Sibanye-Stillwater in June 2019. Sibanye-Stillwater 2020 The Covid-19 Pandemic and the associated national lockdown affected all production from April to the middle May at which point a gradual build-up in production was initiated with a slow return of employees continuing right up to December 2020. Sibanye-Stillwater 2021 K4 shaft reopened and development begins. 42 5.2 Previous Exploration and Mine Development 5.2.1 Previous Exploration The discovery and development of the Merensky Reef in Rustenburg can be traced back to 1925. Exploration by Lonrho Plc began at the Marikana Operations in the mid-1960s and during the past 51 years, several companies have conducted exploration campaigns across the lease area. Underground development to exploit the Merensky Reef commenced in 1970 and mining of the UG2 Reef at Western Platinum commenced in 1982. Extensive mining, surface diamond drilling, 3D seismic surveys and complete airborne magnetic surveys have aided in establishing the geological characteristics of the UG2 and Merensky Reefs at Marikana Operations. Over 900 surface diamond drillholes have been collared and drilled in prior years and exploration drilling is on-going continuously to improve confidence and extend the area of the Mineral Resource. 5.2.1.1 Aeromagnetic Surveys Several aeromagnetic surveys have been conducted over the Marikana Operations. In 1994, an aeromagnetic survey was conducted by “Geodass” over the greater part of the Marikana Operations. The flight line spacing and flight line trend used for this survey was 50m at 000º respectively, whereas the tie line spacing was 250m and the tie line trend was 090º. Horizontal magnetic gradient, radiometric and positional data were recorded. The detail of this survey has been used to define the location of near-surface Iron-rich replacement pegmatoids (IRUP) occurrences in the 4B, K3 and Rowland Shaft blocks, and similarly used to infer the absence of this alteration replacement type material in other areas. It has also assisted with delineating other magnetic stratigraphic units (such as the Main Mottled Anorthosite) above the Merensky Reef which shows the approximate strike over the area). The aeromagnetic survey images (Figure 5) have proved valuable in projecting dykes down dip, as well as defining the well-known major fault structures such as the Marikana and Elandsdrift Faults. In 2011, the area towards the north covering the Schaapkraal prospecting permit was surveyed. 43 Figure 5: Aeromagnetic Image Over Marikana Operations. 5.2.1.2 3D Seismics Seismic surveys covering 1,850 ha have been conducted over parts of the K4 and K3 Sub-incline shaft blocks; 5,846 ha over the MK2-Saffy Shaft blocks and 5,765 ha over K4-K5-MK3 blocks (Figure 6). These surveys were carried out in 2000, 2009 and 2011, respectively. Post-processing of the data included impulse reflector picking and preparation of time-bar-coded and depth contour plans. These contours formed the basis for the structural interpretation. The processed information was further used to interpret the location and size of potholes for both reefs in the K4 Shaft block. No verification of the pothole accuracy has been reported. However, the resolution of the vertical depth can be expected to be within 10 m. The delineation of major fault and dykes structures interpreted from the seismic survey has been partially utilized. At MK2-MK3-Saffy-K5, the seismic information has been used in delineating structure domains. Reprocessing of the K4 seismic data and integration with the K5 seismic data was completed in 2013, and available for future structure updates.
44 Figure 6: Areas Covered by 3D Seismic Surveys (shown in green polygons) Relative to the Marikana- Schaapkraal-Pandora areas. 45 5.2.2 Previous Development Production commenced at Marikana in 1991, following the completion of shaft sinking. The history of other shafts is listed in Table 14. Refer to Table 15 for details of the historical production and financial parameters in calendar years (C), C2017 to C2021. Table 15: Historical Production and Financial Parameters Unit Financial Years C2017 C2018 C2019 C2020 C2021 Main development (1) Advanced (km) 79.1 82.8 85.7 70.6 79.7 Area mined (1) (’000m2) 1.507 1.484 12.45 941 1187 Tonnes milled (2) Underground (’000) 10,105 9,770 8,078 5,609 6,802 Surface (’000) 0 938 3,511 3,447 3,869 Total (’000) 10,105 10,708 11,590 9,056 10,671 BUHG (3) Underground (g/t) 3.89 3.76 3.61 3.70 3.87 Surface (g/t) 0.00 0.89 0.91 0.86 0.87 Combined (g/t) 3.89 3.51 2.79 2.62 2.41 4E produced Underground (Moz) 1.12 1.04 0.82 0.57 0.74 Surface (Moz) 0.00 0.01 0.03 0.04 0.03 Total (Moz) 1.12 1.04 0.85 0.61 0.77 Operating Costs Underground (ZAR/t) Lonmin reporting KPI's were different and hence data is not comparable Surface (ZAR/t) Total (ZAR/t) 1,283 1,569 1,571 Operating Costs (7) (USD/oz) 1,188 1,315 1,372 (ZAR/oz) 17,176 21,638 20,289 All in cost(7) (USD/oz) 1,228 1,208 1,347 (ZAR/oz) 17,756 19,886 19,925 Capital expenditure (ZARm) 1,189 1,223 2,254 1. Main development and area mined come from K3, Rowland, 4B, Saffy and E3 Shafts. 2. Tonnes Milled are from all operating shafts, open pit and surface operations operational at the time of reporting. 3. The yield is in 4E. (Recovered grade). 4. Cost data indicated for 2019 is from the date of acquisition (June 2019) and full year 2020. 5. Production data is for the period January to December. 6. Ounces and kilograms are based on 4E. 46 6 Geological Setting, Mineralization and Deposit 6.1 Regional Geology The Bushveld Complex (Figure 7) is approximately 2,060 million years old. Its mafic to ultramafic rock sequence, the Rustenburg Layered Suite (RLS), is the world’s largest known mafic igneous layered intrusion. The RLS contains about 80% of the world’s known Mineral Reserves of PGMs (Crowson, 2001 in Cawthorn,2010). In addition to PGMs, extensive deposits of iron, tin, chromium, titanium, vanadium, copper, nickel, and cobalt also occur. The Bushveld Complex extends approximately 450km east to west and approximately 250 km north to south. It underlies an area of some 67,000 km2, spanning parts of Limpopo, North West, Gauteng, and Mpumalanga Provinces. The RLS which was derived from differential crystallization of multiple magma injections, occurs geographically as five discrete compartments termed “limbs”, three of which are being exploited for PGMs. These are the Western, Eastern, and Northern Limbs. The Marikana Operations are located on the Western Limb (Figure 8). The RLS comprises rocks ranging from dunite and pyroxenite through norite, gabbro and anorthosite to magnetite- and apatite-rich diorite. The RLS is subdivided in terms of a mineralogically based zonal stratigraphy into five principal zones. 47 Figure 7: Geology of the Bushveld Complex
48 Figure 8: Geology of the Western Limb of the Bushveld Complex, South Africa From the bottom of the sequence to the top (Figure 9), these zones are the 1) Marginal Zone, 2) ultramafic-rich Lower Zone, 3) mafic-rich Critical Zone which hosts multiple chromitite and PGM layers, 4) a mafic-rich Main Zone consisting mostly of gabbro-norites and norites, 5) and the final Upper Zone derived from the crystallization of iron-rich residual fluids. The RLS varies in vertical thickness, reaching up to 8 km in places with some individual layers traceable for over 150 km. However, the PGM bearing reefs are typically only 0.3m to 15m thick, although much greater thicknesses are recorded in the Platreef of the Northern Limb. In the Eastern and Western Limbs, the Critical Zone contains the two principal PGM-bearing reefs: the Merensky Reef and the UG2 Reef. Mineral Resources and Mineral Reserves are reported for both the Merensky and UG2 Reefs which are the primary PGM and base metal sources mined at the Marikana Operations. 49 Figure 9: General Stratigraphic Column of the Rustenburg Layered Suite 6.2 Deposit Types 6.2.1 Formation of Deposit PGM reef-type deposits are deposits where the PGM are the main products and Ni and Cu are the by- products (e.g., the UG-2 and Merensky reefs of the Bushveld Complex, or the J-M reef of the Stillwater Complex, Montana and the MSZ of the Great Dyke of Zimbabwe). The deposits generally contain less than 1-2 % sulphide minerals and tend to form laterally relatively persistent stratiform horizons in large layered intrusions that are often relatively easy to trace once they have been intersected. Most mineral deposits can be classified into specific groups or types and exhibit common features and mineralogical associations which relate to the geological processes that ultimately formed them. Ni- Cu-PGM deposits can be found in a variety of deposit types including (a) magmatic, (b) hydrothermal, (c) sedimentary/placer, and (d) residual/laterites, however, they are almost exclusively dominated by magmatic processes. Magmatic Ni-Cu-PGM deposits have been some of the most sought after and important deposits in the world. At a basic level, formation of these deposits relies on magma generated from the Earth’s mantle, which then intrudes its way into the crust, often melting and incorporating the surrounding rocks causing ‘contamination’ within the original magma. Slow 50 cooling of these magmas generates immiscibility between sulphur and silicate liquids, ultimately leading to the formation of Ni-Cu-PGM enriched sulphide rocks embedded within mafic and ultramafic igneous rocks. Many of these deposits around the world have been identified and are well documented in the literature, including the largest one, Stillwater Complex (United States of America), Norilsk (Russia), Sudbury Complex (Canada) and Great Dyke (Zimbabwe) as well as the Bushveld Complex (South Africa). Ni-Cu-PGM deposits are associated with mafic-ultramafic magmatism with a few key differences to mention between these deposits. 6.2.2 Stillwater Complex The Stillwater Complex is the world’s fourth largest PGM deposit known today and comprises a large irregular sheet-like ultramafic intrusion. The intrusion can be divided into the Ultramafic Basal Series, Lower Banded, Middle Banded and Upper Banded series, which show evidence for multiple injections of magma. The most economically important series is the Lower Banded series, which contains a broadly continuous zone of PGM-rich olivine units known as the J-M Reef (McCallum, 1996). The J-M Reef is hosted within a sequence of harzburgitic and troctolitic rocks and can be traced along strike for approximately 36km with an average thickness of 2m (McCallum, 1996). The reef contains 1-2% disseminated sulphides at 20-25ppm Pt + Pd with 3.6 times the Palladium to Platinum content. Due to the steeply dipping nature of this reef, underground mining methods have had to be implemented. 6.2.3 Norilsk Province Norilsk is the third-largest Ni-Cu-PGM deposit in the world. The Norilsk Province represents a large extrusive or volcanic sequence of basaltic lavas with rare komatiite lavas intruded by isolated layered ultramafic magmas. Like the Stillwater Complex, the Ni-Cu-PGM deposits within the Norilsk Province are associated with these layered ultramafic intrusions. Unlike Stillwater, the sulphides within this province are found ranging from massive, veinlet-disseminated to disseminated ore bodies at varying intervals throughout the layered intrusives. The mineralised zones within the layered intrusives are complex and variable in size and shape, therefore emphasis has only been placed upon the massive ore bodies. The massive ore bodies are by far the most economical in value, which are recorded to reach hundreds of metres in lateral extent ranging from centimetres to 45m in thickness (Krivolutskaya et al., 2014). Ni content is extremely high with these massive ores, up to 3.21 wt %, with Ni/Cu ratios ranging from 0.23 to 0.45. PGM contents within these zones reach 1.5 – 2.0 ppm Pt and 7.0 – 9.0 ppm Pd, mostly confined to the margins of the massive ore bodies (Krivolutskaya et al., 2014). 6.2.4 Sudbury Complex The Sudbury Basin is a unique type of Ni-Cu-PGM deposit, as it is the only deposit related to a meteorite impact and the world’s largest Ni deposit. The complex has been suggested to have formed by impact melting of originally mafic rock types, which have generated a magmatic body consisting of a lower melanocratic norite overlain by leucocratic norite. Then lower norite unit is recorded to have elevated Ni (40 – 1000 ppm), Cu (40 – 1140 ppm), and Pt + Pd (3.7 – 15.1 ppb) with the upper more felsic norite being only somewhat enriched in these elements (Keays & Lightfoot, 2004). Due to the complicated relationship of this deposit with the meteorite impact, several types of 51 mineralised zones have been described, which includes a contact layer, footwall breccias, large radial structured dykes and vein-like deposits (up to 1,000m from the centre of the impact structure). The impact structure itself has been measured up to 200km in diameter, displaying an oblate-like shape. The deposits found within the Sudbury Complex are mainly confined to the margins of the magmatic body and are relatively scattered throughout. The average grade of the deposits been mined show roughly 1.2 wt% Ni, 1.1 wt% Cu, and 0.8 g/t Pt + Pd. Thererefore, there is a target mainly for their Ni and Cu contents with PGM mainly as a by-product (Keays & Lightfoot, 2004). 6.2.5 The Great Dyke The Great Dyke is a linear intrusion that trends north-south that cuts across the Archaean granites and greenstone belts of the Zimbabwe craton consisting of layered mafic and ultramafic rocks (Chaumba and Musa, 2020; Wilson and Prendergast, 2001). The length of the Great Dyke is 550 km, and its thickness varies between 4 km and 11 km in width. The Great Dyke acts as host to the second-largest resource of PGMs in the world (Wilson and Prendergast, 2001). Four sub-chambers make up the Great Dyke, namely Musengezi, Darwendale, Sebakwe and Wedza sub-chambers (Wilson and Prendergast, 2001). Two economically viable zones have been identified: the Main Sulphide Zone (MSZ), which is the most economically viable and the thicker, but lower grade, and the Lower Sulphide Zone (LSZ) that contains much less sulphides. The Main Sulphide zone is 1 to 15m thick, and the Lower Sulphide Zone is 30 to 80m thick. Both the MSZ and LSZ occur within the pyroxenite of the uppermost ultramafic cyclic unit (Wilson, 1996; Wilson and Prendergast, 2001). The average grades reported from mining operations at Ngezi, Unki and Mimosa have shown roughly 3.86 g/t 6E. 6.2.6 The Bushveld Complex Bushveld Complex comprises several intrusive and extrusive bodies, including the RLS, the Lebowa Granite Suite, the Rashoop Granophyre Suite, and the Rooiberg Group Volcanics. The RLS includes many layers grouped into stratigraphic units from base to roof: Marginal Zone, Lower Zone, Critical Zone, Main Zone and Upper Zone, which are distinguished on geological maps or cross-sections. These stratigraphic units show evidence for repeated injections of magma and the changes in mineral composition with stratigraphic position show trends and patterns consistent with the expected crystallisation pattern of mafic magma. The Bushveld Complex is a remarkably well preserved, extremely large mid-Proterozoic intrusion that has escaped regional metamorphism and extensive deformation. The most economically important stratigraphic unit within the RLS is the Critical Zone, which hosts the world greatest chromite and platinum deposits. These deposits are usually situated in successive well- defined layers and are locally termed ‘reefs’. The PGM deposits occur within the well-defined Merensky and UG2 Reefs. The Merensky and UG2 Reefs are Cu-Ni-PGM-enriched contact-type and stratiform chromitite deposits, respectively, with low sulphur content. The PGM mineralised layers are typically in stratigraphic intervals that mark a major lithologic and petrologic change in the layered igneous intrusion. Local and Property Geology
52 6.3 Local and Property Geology 6.3.1 Stratigraphy The recognized stratigraphy underlying the Marikana Operations comprises the Main and Critical Zones of the RLS. The stratigraphy of the RLS as formalised by the South African Committee for Stratigraphy (SACS, 1980) is used in this report. The Main Zone predominantly comprises gabbro–norite and norite rock types, whereas, in the Upper Critical Zone, pyroxenite, norite, anorthosite, and chromitite lithologies are found. The Upper Critical Zone stratigraphy of the RLS, which contains the units of economic interest, the Merensky and UG2 Reefs, comprises well-developed cyclic units divided into six sub-units as follows (Figure 10): • Bastard Pyroxenite • Merensky Reef • Merensky Footwall • UG2 Hangingwall • UG2 Chromitite Layer/Reef • UG1 Chromitite Layer 53 Figure 10: General Stratigraphic Column of the Local Geological Succession After Smith et al 2004 54 6.3.2 The Ore Bodies 6.3.2.1 Merensky Reef The Merensky Reef varies in thickness and PGM mineralization down-dip and along strike across the Marikana Operations. The pyroxenite thickens from ±0.3m in the west to greater than15m in the east of the operations. The bottom contact of the Merensky Pyroxenite is defined by a laterally consistent and well-developed 5 – 10mm thick chromitite layer (Lower Chromitite), which is almost always underlain by a 1 to 3cm thick anorthosite layer. The lower contact of the Merensky Pyroxenite with the underlying anorthosite is sharp and dimpled (Farquhar, 1981) and cross-cutting the layering in the footwall where present. The top contact of the Merensky Pyroxenite may be sharp but is most often gradational over a 10 to 20cm into the overlying spotted anorthosite. A 1 to 2mm thick chromitite layer (Upper Chromitite) is often developed 50 to 100cm below the top contact and often has a few centimetres of pegmatoidal development immediately above and below it. In some areas, up to three chromitite layers can be present in this pegmatoidal zone. A coarse-grained feldspathic pegmatoidal pyroxenite (Merensky Pegmatite) underlies the Merensky Pyroxenite towards the west of the operations. The bottom contact of this unit is also defined by a 1 to 10mm thick chromitite layer (Basal Chromitite). Different facies of the Merensky Reef at the Marikana Operations are locally distinguished, based on the lithology and morphology of the reef as well as the number and position of the chromitite layers associated with the pyroxenite (Figure 11). A map of the spatial distribution is found in Section 11.1.2, Figure 29. Figure 11: Typical PGM Grade Distribution of different Merensky Reef Facies Types at Marikana 55 Brakspruit Facies The Brakspruit facies is characterized by a ~80cm thick medium - to coarse-grained pyroxenite overlying a very coarse-grained pegmatoidal pyroxenite which varies in thickness. Two chromitite layers can be distinguished. One occurs at the bottom of the pyroxenite (Lower Chromitite) and the second at the bottom of the pegmatoidal pyroxenite (Basal Chromitite). Basic stoping parameters include the pyroxenite and pegmatoidal pyroxenite +10cm of footwall. The Rustenburg Facies The Rustenburg facies is characterized by the presence of three chromitite layers, with a Merensky pegmatoidal pyroxenite occurring between the bottom two chromitite layers. The required stoping parameter for this facie is >1m. Basic stoping parameters include 20cm above the top chromitite later to 10cm below the basal pegmatite chromitite layer. Thin Reef Facies The pyroxenite of the Thin facies is generally less than 80cm thick, with a chromitite layer at the bottom contact of the pyroxenite. The economically mineable zone is concentrated around the lower contact of the pyroxenite, but can extend to the underlying anorthosite. Basic stoping parameters include the pyroxenite, the lower chromitite layer and additional footwall material to make up the minimum mining width. The Marikana Facies The Marikana facies is defined by the presence of two chromitite layers normally less than 2m apart. The pyroxenite varies between 1m to 2m thick and the upper chromitite layer occurs 20 to 50cm below the top contact. Basic stoping parameters include 20cm above the upper chromitite layer to 10cm below the lower chromitite layer. The Westplats Facies In the Westplats facies the pyroxenite varies between 2m to 10m. The economically mineable zone consists of the upper 0.8m to 1.2m. Pegmatoidal pyroxenite can be present below the pyroxenite. There are two chromitites layers visible. Basic stoping parameters include 30cm above the upper chromitite layer to 80cm below the upper chromitite layer. The Eastplats Facies The Eastplats facies occurs to the east of the Elandsdrift fault zone and is characterized by a 10 to 16m thick pyroxenite layer with a chromitite layer at the bottom contact and no upper chromitite layer. Disseminated chromitite or small, discontinuous chromitite layers might be present near the top contact but are not well developed. There is no pegmatoidal pyroxenite present at the base of the pyroxenite, but a thin pegmatoidal pyroxenite is often preserved near the gradational top contact. Mineralization occurs mainly in the upper 1 to 2m of the Merensky Pyroxenite. A lesser peak may occur at the Merensky Reef basal contact, associated with the lower chromitite layer, and some sporadic mineralization may be found in various positions in the Merensky Pyroxenite away from either the more consistent top or bottom mineralized zones. The Eastplats facies is not mined underground, but the top 1.2 to 1.4m was previously extracted by open pit-cast mining.
56 6.3.2.2 UG2 Reef The UG2 Reef includes a main chromitite seam, which varies in thickness from 0.7m to 1.3m across the Marikana Operations (Figure 12). The top contact is sharp, planar and laterally very consistent, while the bottom contact is cuspating. The basic mining parameter of the UG2 chromitite seam is to select the composite between the top and bottom contact of the main chromitite seam, with 10cm of footwall material. Figure 12: Typical PGM Grade Distribution of Different UG2 Facies Types At the Marikana eastern shafts, Saffy and E3, thin pyroxenite lenses are often present in the upper part of the UG2 chromitite seam. The lenses can be laterally consistent for tens of metres. Occasional anorthosite or mottled anorthosite partings are less common, are normally thicker than the pyroxenite lenses and often associated with potholes. On the western shafts at Marikana, a continuous layer of pyroxenite separates the UG2 into two layers. This is referred to as “Split Reef”. The internal pyroxenite is 30cm to 70cm thick on the Western side of K3 Shaft, but thickens to the west and north and will have a significant influence on mining in the K4 Shaft area. The grade of the UG2 Split Reef is negatively affected due to dilution caused by the internal pyroxenite. The immediate hanging wall to the UG2, hangingwall 1B(HW1B), is a pyroxenite package varying in thickness from 0m in the west to 18m at EPPL. The grain size of the HW1B pyroxenite is generally finer 57 than that of the overlying HW1A pyroxenite. Large oikocrysts of pyroxene are typical and characteristic of the HW1B unit. The pyroxenite unit contains several chromitite layers locally known as the UG2A Chromitite Markers. Geologically these chromitite layers are considered to be analogous to the “Triplets” described in other areas. The UG2A unit consists mostly of two prominent chromitite layers (a few centimetres thick) which, together with the pyroxenite in-between have a thickness ranging from 10cm to 30cm. HW1B may also contain several thin chromitite layers or disseminated chromite. The contacts of the chromitite layers are planes of low cohesion and hence natural parting planes can occur where they are exposed in or close to mine workings which pose a safety risk. This is briefly addressed in the geotechnical Sections 12.4.2. The UG2A and HW1B layers combined (top of UG2 to top of UG2A) is referred to as the UG2 beam. The thickness of the beam increases from west to east (as the thickness of HW1B increases) and is important because the Rock Engineering support standards are designed to accommodate the beam thickness at the specific shaft or shaft area. (Additional information is provided in Section 13.3). Based on sampling (underground and surface exploration) and assay data, two main UG2 Reef facies occur at the Marikana Operations. They are referred to as the Normal and Split Reef facies. Split Reef Facies The Split Reef facies occurs on the western border of the Marikana Operations and make up a much smaller area as opposed to the Normal Reef facies which occur over a much larger footprint of the Marikana Operations. The Split Reef facie is characterized by the massive chromitite, which is separated by a feldspathic pyroxenite parting into a lower (UG2 Main Seam) and Upper chromitite unit (Leader Seam). The internal waste parting has an average thickness of 30cm. Grades, thicknesses and densities of each of the three stratigraphic units of the Split Reef have been estimated separately into the resource block models. A nominal 4E grade of 0.01 g/t was assigned to the internal waste parting. Thickness (length) and density-weighted 4E grades as well as density-weighted thicknesses are applied to the units to make-up the in-situ Mineral Resource cut at a block model level. A sub-geozone of the Split Reef facies has been demarcated where the internal waste parting is more than 25cm thick. It is referred to as the Undercut Reef geozone. In this area the pyroxenite parting and Leader Seam of the hangingwall stratigraphy will be undercut and only the Main Seam chromitite will be mined. Normal Reef Geozone Stratigraphically the Normal Reef geozone can be described where the Leader and the Main Seam. Merge. As a result, no internal waste parting exists for the Normal Reef geozone. For Mineral Resource estimation purposes the Normal Reef geozone is divided into sub-geozones which related to grade and thicknesses of the chromitite and further based on either combining of underground sampling and surface exploration sampling during the estimation process or not due to data support differences. 58 6.3.3 Structure The stratigraphic sequence of the Upper Critical Zone at Marikana Operations consists of alternating pyroxenite, norite, anorthosite and chromitite layers. The UG2 Reef underlies the Merensky Reef by 130m to 230m with the middling increasing from west to east. Both Reefs outcrop for a distance of 27km along strike within the Marikana Operations area. The regional dip varies between 10 and 13 degrees with a general dip direction of north-northeast (Figure 13 and Figure 14). Localised geological discontinuities associated with the Merensky and UG2 Reefs include potholes, faults, joints, shears zones, dykes and IRUP. The Merensky Reef is also disrupted by the occurrence of a very fine-grained pyroxenite, locally referred to as “Brown Sugar Norite”. Geotechnical risks associated with these features are described in Section 13.3. 59 Figure 13: Structure Map of Marikana Figure 14: Section of Marikana S-N
60 6.3.3.1 Faults Marikana Operations are transected by major faults and dykes trending in NW-SE and NE-SW directions which have a strong influence in compartmentalizing the mining area into districts. At least nine major faults zones have been identified at the Marikana Operations. These have been defined as fault zones that have measured displacements ranging from 20-120 m. It is expected that no mining will be possible in these fault zones and are characterized as geological loss zones. The large fault zones from west to east include the Spruitfontein, Marikana, Elandsdrift, and Harties West faults (Figure 44). The Spruitfontein fault is related to an anticlinal fold structure present in the Transvaal basement rocks. The regional strike change on the western side of Marikana is related to this basement high. Other faults include Saffy East, Turffontein West and Turffontein East faults. The Spruitfontein fault strikes north-northwest and is situated close to the western boundary of Marikana, where it is exposed in mine workings at the K3 and 4Belt Shafts. The displacement of the Reefs along the fault is 4m but has an inconsistent direction. The Marikana fault acts as a natural shaft block boundary between K3 shaft and Rowland shaft. This north-northwest striking, sub-vertical dipping fault has an estimated displacement of approximately 10- 20m to the east. The north-northwest striking, sub-vertical to vertical dipping Elandsdrift fault divides the Marikana Operations into east and west compartments. It has an estimated displacement of approximately 100- 120m to the east in the shallower part of the operations, but displacements decrease down dip. The Elandsdrift fault is interpreted to split into an east and west fault where each of these splays was found to exist as small graben-type faults as revealed from the 3D seismic information. 61 Towards the eastern part of Marikana Operations, there are a series of faults including Saffy East, Saffy West, Turffontein faults, which have reef displacements of 10-20m, whereas the Harties West fault has a large displacement of 60m. To the extreme east, the Roodekopjes fault forms the western limit of the Brits Graben and has a displacement greater than 500m. This fault forms the practical mining limit towards the east of the E4 project area. 6.3.3.2 Dykes Dykes have been interpreted across the Marikana Operations from the airborne aeromagnetic survey information and underground intersections. Faulting and water accumulations associated with these dykes can be problematic to mining development and extraction. Often dykes can be bounded by major weathering zones resulting in poor ground conditions in general. In the K4 shaft project area to the west of the operations, a regional west-northwest trending dyke interpreted from the aeromagnetic survey intersects the area to the north-east (K4D1). The dip of this dyke is assumed to be sub-vertical to vertical. The K4D1 dyke extends into the Hossy, Newman and MK2 shaft blocks has been interpreted from the aeromagnetic and 3D seismic surveys and is referred to as the HD1. The dip of this west-northwest trending dyke is sub-vertical to vertical, between 70 to 80 degrees with a dip direction towards the north-east. The occurrence of a dyke swarm (ED1 to ED10) to the east of the operations has been interpreted from the aeromagnetic and 3D seismic surveys. These north-northwest trending dykes dip between 70 to 80 degrees to the west. 6.3.3.3 Potholes The term Pothole is applied to features that affect the Merensky and the UG2 Reef and refers to the downward transgression of the reef through single or multiple underlying footwall layers, only to stabilize (unless catastrophic, which occur sporadically) on a specific footwall layer, lower than the original or normal stratigraphic position. The hypotheses for pothole formation involve several mechanisms, including downward erosion, upward fluid movement, or syn-magmatic deformation (Watson et al., 2021). At Marikana Operations, there is a high percentage of pothole loss at the western half of the Operations with a marked decrease to the east of the Elandsdrift Fault on the remaining half of the operations. At the K3 Shaft and 4B Incline Shaft, the pothole loss percentage on the UG2 Reef averages 14% whereas the Saffy and E3 Shafts have less than 5% loss. Pothole losses on the Merensky Reef at K3 are approximately 10%. Schematic sections in Figure 15 and Figure 16 below describe the type of potholing of the UG2 Reef. Similar structures are found on the Merensky Reef. 62 Figure 15: Example of a Shallow Dipping Pothole Associated with the UG2 Figure 16: Example of Deep Potholing Associated with the UG2 6.3.3.4 IRUP Iron-rich replacement pegmatoids (IRUP) comprise a suite of coarse crystalline, and unconformable replacement bodies, which occur throughout the Marikana Operations. They range from small, irregular, and vein-like features, to large sheet-like bodies up to hundreds of metres across, and pipe- like plugs up to 1.5 km wide (Figure 17). Within the operations, different levels of IRUP replacement occur but it is only the total replacement of the Merensky Reef that causes large difficulties, as lithological units become unrecognisable. IRUP replacement is typically pegmatoidal, often containing high levels of titanium rich magnetite (Reid and Basson, 2002). The UG2 Reef is not replaced, IRUP only generally affects the hangingwall or 63 footwall stratigraphy. However, the mineralogy of the reefs is changed due to the high temperature, high pressure, and volatiles associated with the replacement process which reduces plant recoveries of the PGM assemblage. Local changes in the strike are observed at Marikana Operations, most noticeably to the west associated with the Spruitfontein fault zone and IRUP bodies, and to the east within the Middlekraal depression area. Figure 17: IRUP (red) Unconformably Cut Across the Layered Lithological Sequence. 6.3.4 Mineralogy 6.3.4.1 Merensky Reef The Merensky Reef mineralogy comprises major silicate minerals: pyroxene, plagioclase, and biotite. These minerals form secondary minerals such as talc and chlorite in structurally disturbed and weathered areas. PGM mineralization is closely related to thin chromite layers (1mm to 5cm thick). PGM and sulphide mineralization can also occur in the immediate footwall rocks. The dominant platinum group minerals are ~30% Pt-Pd sulphides (braggite-cooperite), ~11% PGM tellurides and arsenides, ~6% sperrylite and minor PGM alloys. Platinum group mineral grain sizes have two size ranges in the Merensky Reef: 10 to 30µm and 50 to 350µm. The platinum-group minerals of the Merensky Reef occur in three textural associations: • Enclosed in or attached to base metal sulphides (38 - 97 %). This is a common occurrence on the western limb.
64 • Enclosed in silicate (3 - 62%) and further north along the western limb past the regional Swartklip facies (62%). • Enclosed in/or attached to chromite or Fe-oxide. 6.3.4.2 UG2 Reef The UG2 Reef is composed of 60 to 90% (by volume) chromite, 5 to 25% orthopyroxene, 5 to 15% plagioclase and accessory amounts of other minerals, including clinopyroxene, base metal and other sulphides, platinum-group minerals, ilmenite and magnetite. The UG2 Reef often has a mottled appearance due to the presence of large poikilitic bronzite crystals. The UG2 Reef contains much less sulphide minerals compared to the Merensky Reef. The base metal sulphides are predominantly pentlandite, pyrrhotite, pyrite and chalcopyrite. PGM minerals identified in the UG2 are Cooperite, Laurite, Braggite, Sperrylite and Pt alloys (Pt-Fe & PT-As). Platinum group mineral grains in UG2 Reef can be classified into one of the following categories according to their textural setting: • Locked in base-metal sulphide • Locked in chromite • Locked in silicate • At grain boundaries of base metal-sulphides, silicates and chromite. 7 Exploration There is no current exploration on this property. Any drilling, including surface drilling is related to mine planning. There are no exploration results to report. Information below on surface holes is given to illustrate the type of data that was collected in the past. 7.1 Exploration Data Extensive mining, surface diamond drilling, 3D seismic surveys and complete airborne magnetic surveys have aided in establishing the geological characteristics of the UG2 and Merensky Reefs at the Marikana Operations. Direct observations include underground channel sampling and geological stope and pit mapping. The property is an established mine and the extent of the mineralization is well defined. Geophysical surveys and non drilling exploration are relevant to the property at this stage of development. 7.2 Geophysical Surveys No geophysical surveys have been flown over the property recently. No gravity surveys had been conducted over the property recently. A brief description of historical aeromagnetic and 3D seismic surveys is given in Sections 5.2.1.1 and 5.2.1.2. 65 7.3 Topographic Surveys The topography in the lease areas is well mapped from historical surveys. A new topographic survey was flown in 2021 to map the surface features, including tailings dams. Any recent changes to the surface topography will not affect the geological interpretation or infrastructure. 7.4 Exploration and Mineral Resource Evaluation Drilling 7.4.1 Overview Geological Models and Mineral Resources at Marikana Operations are based on surface and underground drillhole data as well as underground channel sample data. Surface diamond drillholes (DDH) were drilled to the maximum depth of 2,000m and have near vertical intersections with the reef horizons. Exploration holes were drilled on irregular grid intervals of 50m - 2,000m, depending on historical exploration strategy, depth of the mineralized horizons and geological uncertainty. Once underground access is available, infill development drilling is undertaken from access haulages and crosscuts to provide a 30m - 100m grid depending on geological requirements from structural, safety and evaluation perspectives. In the case of capital-funded surface and underground exploration DDH, BQ size diamond drill core is recovered from the mother hole. Thereafter, four TBW size deflections are drilled for each reef intersection, producing a total of four deflections for Merensky Reef and four deflections for UG2 Reef. In cases of adverse drilling conditions, more than four deflections may be drilled. The core is halved using a diamond saw, with one half retained for records or metallurgical purposes and the other half assayed. For routine working cost underground DDH, the drill diameter is generally less than for surface drillholes and where applicable usually the entire core is sampled and assayed. Sample sections are captured directly into the SABLE database, where the spatial validity is checked. Planned and unplanned task observations are some of the QA/QC procedures used to ensure sampling protocol is maintained. The final submission of each sample into Sibanye-Stillwater’s PGM SABLE database is only completed following a series of checks and approvals. Marikana Operations rely on in-house assay laboratories. Samples from historical surface drilling until 2015 were analysed at SGS but channel samples have been analysed at the onsite laboratories. Marikana Operations Drillhole Inventory: 1,998 drillholes are included in the surface drillhole dataset. These can be divided as: • 1,913 mother drillholes with 6,406 deflections are derived from surface drilling campaigns between the 1960s and 2015 when the last surface drilling activity took place. These drillholes include data for both UG2 and Merensky Reefs. • 85 drillholes are derived from underground drilling intersections that were sampled and assayed. • 550 drillholes were drilled in open pits and were not assayed or used for Mineral Resource estimation. They were only used for guidance during mining. • 89 drillholes were drilled on the tailings dams and used for a separate Mineral Resource estimation. 66 • 3,545 deflections had assay information available. The deflections that had no assay information were not used for Mineral Resource estimation, however if validated and not geologically disturbed, these drillholes were used for geological models (2,137 deflections with no useable data for estimation, missing fields and values or non-representative intersections). • 3,247 deflections had the correct data formats and information for estimation. After further validation and removal of deflections due to specific validation errors detailed in the data processing macros and due to geological disturbances, i.e. potholes, faults, IRUP etc. • 2,917 drillhole deflections from the SABLE database are authorized and validated for Mineral Resource estimation, 1,246 are used for the Merensky Reef estimate and 1,671 are used in the UG2 Reef estimate. Changes in the drillhole inventory in 2021 are shown in Figure 18. Figure 18: Reconciliation of Drillhole Data (no change from 2020) 7.4.2 Planned Evaluation Drilling for 2021 Table 16 represents the planned surface and underground drilling that will be performed at Marikana in 2022. No surface drilling took place in the 2021 and 2020 years; drilling metres and costs shown represent the actual underground drilling results for all Marikana shafts for 2021 and 2020. 67 Table 16: Marikana Evaluation Drilling Costs Drilling (Working Cost & Capital All Reefs) C2022 Planned C2021 Drilled C2020 Drilled Metres Planned ZAR Million Metres Drilled ZAR Million Metres Drilled ZAR Million 4Belt Shaft 1,595 2.71 No surface drilling No surface drilling K4 Shaft 12,000 24.61 SaffyShaft 2,463 3.74 E3 Shaft 405 0.61 Underground drilling 6,365 5.07 Total 22,828 36.74 2,392 1.99 2,297 2.30 The target areas (Figure 19) and activities identified at 4Belt Shaft include: 1. Drilli ng to refine the Mineral Resource model (4B01) 2. Drilli ng to refine the Mineral Resource model and to confirm IRUP extent and upgrade domain (4B02 – 4B06) The target areas (Figure 20) and activities identified at K4 Shaft include: 1. Drilli ng to refine the Mineral Resource model and to upgrade and refine the Merensky Reef Facies (K401- K409). The target areas (Figure 20) and activities identified at Saffy and E3 Shafts include: 1. Drilli ng to refine the Mineral Resource model (SAF01). 2. Drilli ng to refine the structural block between two major dykes (SAF02 – SAF04). 3. Drilli ng to refine the structural block between two major faults. (E301).
68 Figure 19: Overview of Exploration Planned for Marikana 4B Shaft Figure 20: Overview of Exploration Planned for Marikana Saffy and E3 Shafts 69 7.4.3 Drilling Methods 7.4.3.1 Surface Surface drilling is currently taking place as outlined above. Historically surface boreholes were drilled in the area from the early 1900’s to late 2000’s, on a scattered grid of between 50m to 2,000 km spacing. These holes can reach depths of greater than 2 km in the areas below the current infrastructure at the Marikana Operations. Diamond drill coring was the preferred method of drilling for Marikana Operations. Figure 21 shows a typical diamond drill core with the machine diamond drilling bit. Figure 21: Example of Diamond Drill Core (https://www.geologyforinvestors.com/diamond-drillhole-drilling/ accessed 23/09/20) The typical steps followed would have been: • In a case where Sibanye-Stillwater does not own the surface rights, permission from the land owner is obtained. • A drillhole start note is compiled, which displays the drillhole identification, location of the collar, the planned depth and a plan showing any possible underground workings that could be intersected. The drillhole is to be sited by the responsible geologist using a GPS. • The drill rig supervisor will establish the drill site using a minimum footprint and will comply with good housekeeping and approved standards and procedures. • The drill site will be clearly demarcated by use of the appropriate materials and open sumps should be contained within a secured or permanently manned area. 70 • Drilling begins with a large diameter ‘open hole’ (open hole means non-coring and only chips are recovered). The diameter of this hole can be 200 to 250mm (8 to 10 inches). The depth of this hole also varies as it is usually drilled to solid bedrock, through soils and oxidized rock. The diameter of the hole reduces in various steps, at differing depths down the hole, to reach typically BQ size hole (75mm hole size and 50mm core). • Hole collar is surveyed using land surveying methods to give x, y, and z positions or coordinates. • Drilling continues until one or both reefs are intersected, or in the case of an unsuccessful hole the hole is abandoned. Once the reef is intersected, an additional 50m is drilled and the ‘Mother hole’ as it is then known as complete. • Once the mother hole is complete, a down hole survey is performed (and any other geophysical surveys as required), so that the inclination and direction of the hole can be recorded. (Section 7.6). • Typically (but not always), additional intersections (or runs) of the target reef are obtained by ‘wedging’. A steel wedge is inserted above the reef and locked into place, this can be directional i.e. surveyed in place or non-directional meaning the direction of the resulting deflection is not prescribed. The wedge acts as a guide to deflect the drill string off to one side of the hole so that additional reef intersection can be obtained. • This is repeated as often as needed to get representative reef intersections, with the wedges being set higher and higher up the hole, and denoted by the identification of the drillhole ID _D1 to drillhole ID _Dn. Under normal reef conditions, four (4) deflections are planned per reef intersection. • All reef runs are drilled TBW core size. • A diagram of a set of deflections from its motherhole is known as a dendrogram and is shown in Figure 22. • Once the drillhole is completed, rods are removed, the upper part of the hole is cemented or plugged and any recoverable casings are removed. • Whole site is rehabilitated and a cap or marker placed on the remaining casing to the requirements of the land owner. 71 Figure 22: Schematic Vertical Section of a Typical Surface Drillhole 7.4.3.2 Underground Drilling Underground drilling (i.e., the machine itself is underground during drilling) takes place for three distinct reasons, these are: • Cover drilling • Short exploration holes (working cost) • Mining Holes (drain holes, holes for geophones, etc.) Cover drilling Cover drilling refers to the drilling of generally flat or slightly inclined holes ahead of mining to detect the presence of water and flammable gasses which could potentially result in injury, fatalities and property damage. A digital plan depicting all the development ends per shaft is constructed annually and submitted to the DMRE. Based on the geology and historic water intersections the shafts are divided into different hydrological or risk areas. The type of water/flammable gas cover required for each area is clearly shown by this plan.
72 The following types of cover are specified on the Water Plan: • Sing le Cover – A single set of staggered 120m cover holes with no less than a 15m overlap (Figure 23). • Dou ble Cover – A double set of 120m staggered cover holes with a 60m overlap. (Figure 24) o Not e: Start of cross-cuts, tramming loops, lay-bys and any excavation that is within 30m of haulage excavation is deemed to be in cover. The following risk areas are specified per shaft per area on the Water Plan: Level 1 Risk Area • All known major geological disturbances (inclusive of all dykes of more than 10m thickness, faults of more than 10m displacement and major shear zones) as indicated on the structural plan (Aeromagnetic study, Seismic Interpretation Data, surface mapping, original surface drilling and from historic underground mapping) will be cover drilled within a 150m envelope on either side of these known structures. These areas will include all historically recorded geological features associated with very poor ground conditions or water intersections greater than 5,000 l/h or flammable gas intersections. The cover drilling design will be based on a single cover hole pattern with a 15m overlap portion in consecutive holes. Double cover may be recommended by the Superintendent Geology for areas advancing through fissure zones known to have poor ground conditions. Level 2 Risk Area • These areas will be delineated around projected problematic geological structures that were intersected previously along dip or strike. These structures will be cover drilled on discretion through a documented decision taken during water board planning meetings. Level 3 Risk Area • These areas pertain to localities on the mine property where no high volumes of water and/or flammable gas are expected from surrounding geotechnical observations. The development ends will be covered by the drilling of pilot holes as per mining standards for development ends. Every development end shall, before drilling blast pilot holes, drill two pilot holes in opposing corners to prevent the uncontrolled intersection of water or flammable gas from isolated pockets. Corners should be alternated between blasts. Pilot holes are under no condition a replacement for cover holes. The requirement for geological cover drilling over and above the pilot holes in an area will be revised during water board planning meetings and the area will be elevated to a Level 2 or Level 1 Risk Area and cover drilled accordingly. Mining within 60m depth below major rivers (mechanised mines) 73 • An area that will be undermining a river will be cover drilled within a 150m envelope on either side of the river. The cover drilling design will be based on a double cover hole pattern with a 60m overlap portion in consecutive holes. Vertical Shafts • Requires four cover holes drilled from each station development level, one within each quadrant of the shaft area. These holes will be inclined at -75º and the direction will be 45º from the on-line direction and drilled to provide a six (6) metre overlap with the next station level to be developed. Inclined Shafts • All inclined shafts will at least be covered with a single series of overlapping cover holes drilled parallel to the dip of the excavation being developed. Inclined shafts are to be cover drilled with 120m inclined holes with 15m overlap. Figure 23: Configurations for Cover Drilling - Single Cover Drilling Layout (one-sided). 74 Figure 24: Configurations for Cover Drilling - Double Cover Drilling Layout. Short hole exploration These holes are targeted for reef intercepts from the underground workings that are in place to exploit the same reef. As a result, these holes tend to be a maximum length of about 120m for air-powered drilling or 250m for hydraulic-powered drilling. Unlike surface drilling, short-hole exploration seldom uses wedges to get additional reef intersections, and accordingly, one reef intersection per hole is the norm. There is no fixed pattern for this type of drilling but holes are roughly spaced to get an intercept at every raiseline tip position, approximately every 30 to 50m depending on the mining layout. Holes are aimed to be drilled in a cubby alongside the haulage which services the reef. This type of drilling is also used to gather further information for certain structures such as dykes or faults and the target might not necessarily be for reef intersections. The frequency of drilling would increase in structurally complicated areas if required. These short holes remain reasonably straight on azimuth and dip and are not surveyed with down-hole instruments. Occasionally the collars of these short holes are surveyed by the Survey Department where necessary. Mining holes Where the intersection of water or flammable gas quantity is deemed significant, the intersection can be allowed to bleed under a controlled environment, or it can be sealed at the source. All sealing work is to be done through a sealing company contractually appointed on behalf of Sibanye- Stillwater. • Ring cover should be executed in the event of water intersections greater than 5,000 litres/hour in any cover (or ring cover) drillhole. Order of drilling and sealing will be based on the standard ring cover procedure (Figure 25). 75 • Primary ring cover holes will be drilled from all four corners of the face. All holes will be drilled 10 degrees outward from the centre line; the top holes will be 10 degrees up and the bottom holes 10 degrees down. • Upon completion of the above, a central drillhole (hole No.5 in Figure 25) will be drilled to confirm the absence of water and/or gas ahead of the face. The check hole will be flat, online and will advance at least 30m beyond the previously defined position of the water intersection. If hole No.5 again intersects gas and/or water the second set of ring cover drillholes needs to be drilled. • Upon completion of sealing of secondary holes, a central drillhole (hole No.10 in Figure 25) will be drilled to confirm the absence of water and/or gas ahead of the face. If drillhole No.10 is found to be free of significant quantities of water (quantities that can be handled by the specific mining level’s pumping arrangement), then the development can continue up to the position deemed in cover. Figure 25: Ring Cover Configuration – Drilling and Sealing Order.
76 7.4.4 Core Logging and Reef Delineation The Mineral Resource estimation process used for Marikana Operations is based on surface and underground exploration drillhole data as well as underground channel sample data. For both drillhole and underground channel samples, Marikana has a comprehensive standard defining the specific methodology for sampling, which is designed to ensure as far as possible unbiased and representative samples, as well as to ensure the consistency of the sampling. 7.4.4.1 Surface (Historical 1960’s to 2000’s) The following is a brief description of the procedures in place at the time of drilling. All drillhole core, whether from surface or underground is logged and sampled the same (or very similar) way. The core is obtained from the core barrel, once the driller has completed a drill run, or preferably on a daily basis and emptied into a suitably sized (Core sizes NH, BQ, TBW etc.) core tray. This tray is transported to the coreyard of the operation where the core is cleaned and marked with the depths of the run, the drillhole name and metre marks. Any losses are identified and core loss amount noted. This mark-up is completed by the drill contractor. The core is then transferred into a differing ‘permanent’ core tray so that the transporting tray can return to the drill site. The geologist then observes the core and immediately checks for stratigraphic correctness. The following is an extract from Marikana Operations drillhole geological logging and sampling procedure which details the process • Check that the core is clean, fits together and orientated correctly per core box. • Core boxes are laid out from shallowest to deepest with ends of core in each box clearly marked. • Check that the metre clino-rule used is correctly calibrated with a steel metre tape • Check for errors in the stick-up depths and marked metres of the mother hole and compare with all deflections. Ensure that the reef intersection depth of the mother hole does not differ greatly to all the deflections (not more than 30cm). • Determine core loss (or gain) and note position of start of BQ size core. • Any sudden changes in lithology without faulting are noted and the core checked to see if it fits together on either side. • Any discrepancies identified in 1 to 6 above are discussed and resolved with the Diamond Drill Foreman. • Before logging in detail, determine the major stratigraphic units and forms general impression of the hole. • For both the UG2 and Merensky Reef intersections, rotate and fit core correctly before logging. 77 • Compare mother hole with all deflections and determine the facies type of reef intersections (UG2 and Merensky Reefs). • Mark the stratigraphic contacts of both UG2 and Merensky hangingwall and footwall units. • All logging and checking of core is done when core is wet (use spray bottle or hose pipe). • Logging recorded on the relevant log sheet with all the required fields captured manually. • Logging of the minimum required information must be logged using the prescribed SABLE codes. • For any dip measurement, readings are taken relative to the perpendicular (Alpha angle). • Safety precautions are to be adhered to at all times. 7.4.4.2 Underground Channel Sampling Within underground workings, exposures of the reef have channel samples taken. Individual channels are cut from the underground development-working faces using a diamond saw. A representative section of the target reef intersection should be recorded in the field book and the respective sample numbers, relative to their sequential position, should be reflected relative to the profile, from footwall to hangingwall. The Marikana Operations development channel sampling interval standards vary per shaft and reef facies. For the UG2 Reef at all shafts samples are taken at 30m intervals on dip and the strike component varies by mining method. For the Merensky Reef, samples are taken at 5m intervals on dip at the western shafts and 10m at the eastern shafts. Channels are defined perpendicular to the reef plane and each section’s position is fixed by offsetting from survey pegs. The reef is segregated according to a sampling pattern and is correlated between sample sections, and individual samples of 10cm – 20cm in length are taken to reflect the internal geometry of the reef, with not less than a 10cm sample being taken on top or bottom contacts. The sample mass taken is in the order of 500g to 1,000g. Capture - Underground Sampling The data is stored in two linked databases. The following capture process is followed. • Sample taken-data entered into MineRP • Draws section-validated location and geology in MineRP • Sampling data from MineRP is linked to Metallurgical Execution System (MES) • Assays received from LIMS and automatically populated via sample ID into tables in MES • QC checks are carried out in MES • Assay data is accepted or rejected in MES and either linked to MineRP (MRM) or sent back to the laboratory for re-assay and • Final authorized assay and location data is sourced from the MineRP MRM database via a standard report extracted as a *.CSV file. Capture – Borehole Data 78 • Logging and sampling are captured directly into the SABLE Database • Assays are imported into the SABLE database from *.CSV files • All quality control analysis on logging is carried out via standard routines in SABLE and assays via Excel templates and • Once authorized, drillhole data is exported to an Excel spreadsheet. 7.4.4.3 Quality Control in Drilling. Quality control in drilling has been practiced over many decades and was a standard feature of drilling procedures both historic and current. Table 17 shows the typical quality control measures adopted for drilling. Table 17: Quality Control in Drilling Risk / Mistake Cause Mitigation/Remedial Action Mixed core Dropped core tray Ensure pieces lock & stratigraphy lithology ‘flows.’ Mixed on transfer box to box Transfer core barrel to tray Core tray to sample bag Ground core Core left in the core barrel too long Core loss should indicate how much ground away, stick up required Friable ground Cement and redrill Core loss Ground core Cement and redrill Friable/void ground Depth markings Driller’s rule / tape incorrect Get correct length instrument & remark Incorrect from - to recorded Regular reviews by the responsible person Differing core barrel lengths or incorrect lengths used Increased supervision of drillers The QPs are satisfied with the core logging, and reef delineation carried out at Marikana Operations. These activities are performed by trained Geologists who are supervised by experienced Geologists. The use of a common procedure for core logging and reef delineation and marking ensures consistent core logging and sampling at Marikana, which facilitates the integration of the datasets during interpretation. 7.5 Survey Data Typically two survey types are required for each drillhole, these are: • Collar survey • Downhole survey • Occasionally geophysical surveys are carried out 79 Collar surveys for surface holes are usually carried out by a qualified land surveyor, either using trigonometric beacons and triangulation (historical practice) or lately by using differential GPS System. Accuracy is within the 10cm range. Collar surveys for underground holes are usually taken from the nearest survey underground peg and measured using tapes and a clinorule. Accuracy is probably of the order of 20cm Downhole surveys, typically performed for surface holes have evolved in the past. Photographic Downhole Survey -1930’s to 1990’s (Leutert, Sperry Sun) The magnetic single shot survey uses a small camera mounted to the drill string which takes photographs of a compass card, and plumb bob which indicates the dip and dip direction of the hole at a particular depth. As only a single shot the survey must be run several times to get an overall trajectory of the hole. Later developments along the same theme were the magnetic multi-shot surveys where the film was captured on a roll. See: https://www.drillingmanual.com/2017/12/directional-drilling-surveying-magnetic.html for details. Gyroscope survey Gyroscope surveys were utilised for some of the last surface drillholes to be drilled, around the early to late 2000’s. For a complete description of the method a good reference is https://www.drillingmanual.com/2017/12/directional-drilling-surveying-gyro.html. Multishot Surveys More recently surveys use Electronic Multishot Surveys which use accelerometers to measure gravity, and therefore inclination, and magnetometers to measure the Earth’s magnetic field at the survey point, and thus declination of the drillhole Underground Surveys Historically and currently at Marikana Operations, most short underground holes are assumed to be straight and therefore not surveyed. The QPs are satisfied with the surveying methodology at the Marikana Operations. These activities are performed by trained surveyors who have sufficient experience with this type of orebody and mining method. The surveys are deemed to be of sufficient quality for use in Mineral Resource estimation. 7.6 Density Determination 7.6.1 Underground Drillholes and Channel Samples Marikana Operations have a programme in place for the testing of the Relative Density (RD) of the main reef horizons. Density measurements are performed on every section cut underground using the Archimedes method. It is assumed that the water is pure and has a density of 1 g/cm3. Both the dry and wet weight of each sample is taken and recorded. After each reading, the scale is set to zero
80 before taking the next measurement. The following formula is used to calculate the final density per sample: • (Dry weight/(Dry weight - Wet weight). The average measured densities are • UG2 Hangingwall Pyroxenite – 3.24 t/m3 • UG2 Reef – 3.87 t/m3 • UG2 Footwall – 3.20 t/m3 • Merensky Hangingwall Anorthosite – 2.98 t/m3 • Merensky Pyroxenite (Reef) - 3.18 t/m3 • Merensky Norite Footwall – 2.82 t/m3 7.6.2 Surface drillholes Marikana Operations have a program in place for the testing of the Relative Density (RD) of the main reef horizons for the surface drilling sampling programs. Density measurements are performed on every sample to be sent for assay using the Archimedes method. Historically, sample densities were read using a gas pycnometer, but samples with Archimedes results are favoured and used in Mineral Resource estimation where both sets of data exist. It is assumed that the water is pure and has a density of 1 g/cm3. Both the dry and wet weight of each sample is taken and recorded. After each reading, the scale is set to zero before taking the next measurement. The following formula is used to calculate the final density per sample: • (Dry weight)/(Dry weight - Wet weight) The average measured densities for the UG2 and Merensky Reef are 3.87 and 3.18 t/m3, respectively. 7.6.3 Tailings Facility The Eastern Tailings Dam 1 TSF (ETD1) is a dam where the tailings deposited are from the UG2 Reef only. The ETD1 density values were determined in two ways, a “fixed volume” method and a bulk density test. The “Fixed Volume” Method was determined as follows: • A container of known volume (four litres) and mass was filled directly from the auger holes. • The container and together with its contents were weighed and the weight of the container subtracted to obtain the mass of the sample. • The mass of the sample was divided by the volume of the container (and therefore the sample) to obtain the wet in-situ density. • The sample was dried and weighed again to obtain the dry in-situ density. 81 This was conducted for 37 samples over several locations and depths on the dam. The results indicated an average dry in-situ bulk density of 1.85 t/m3. To determine in-situ bulk density, the volume of the auger hole and the weight of the samples were used. The outside diameter of the auger shell was 48.01mm as determined using a Vernier. The results of this test showed a very similar mean to that of the fixed density method 1.80 t/m3 versus 1.85 t/m3. Given the close similarity between the methods (3% difference), it was decided to use the same principle in the block model estimation, whereby in-situ bulk densities determined from the mass per metre and auger hole volume would be determined by kriging and incorporated into the block model. 7.7 Underground Mapping The principal objectives of underground mapping are to: • Identify and record the positions of faults, dykes and any other disturbances in a working place, so that projections can be made ahead of the face and/or up to reef plane. • Record the thickness and nature of the reef so that facies trends can be delineated and later reconciled with sampling data. • Record and bring to the attention of the Mining Department any areas where reef remains in the hanging or footwall of the stope and/or new geological structures identified. Mapping is carried out continuously, using a set of documented procedures, and plans updated as data is collected. 7.8 Hydrological Drilling and Testwork Refer to Section 17.5.6, Water Strategy. 7.9 Geotechnical Data, Testing and Analysis Surface and underground exploration diamond drilling (core coring) is undertaken at all Marikana operations. The core is logged for geological and geotechnical information. Core logging is an integral part of the Mineral Resource definition and must be performed with due diligence. 7.9.1 Data Collection Rock engineering and support designs have been developed using a combination of geotechnical drillcore logging and underground mapping data. Geotechnical drillcore logging is the primary method of gathering rock strength and quality parameters. Geotechnical logging is completed by Geologists on drillcores recovered from surface exploration and underground cover and diamond drilling. Geotechnical core logging entails the collection of structural information from the cores. There are many parameters that are recorded during geotechnical core logging but the following are the main ones; • Depth defining the start of each geotechnical unit 82 • Depth representing the end of each geotechnical unit • Unique identification of each geotechnical unit • Detailed description of the geotechnical feature (type, of plane, number of discontinuities, angle of discontinuity, infill type and integrity, thickness of infill, small scale and large scale roughness, alteration type). Underground mapping includes scanline mapping techniques, rock mass classification (RMC) data collection techniques and data collected using borehole cameras, GPRs and SSPs. Rock mass classification data is collected regularly during routine inspections. Scanline mapping and geotechnical core logs by rock engineering personnel are done on an ad-hoc basis. Various tests are then commissioned based on the data obtained from drill core runs and the information derived therefrom. Samples from drillcores are sent to the laboratory to determine the properties of intact rock and joint walls. Data is collected from laboratories approved by the International Society for Rock Mechanics (ISRM), South African National Bureau of Standards (SANBS)using ISRM testing techniques. In addition, data is also collected and reviewed from various other sources, including academic research institutions, as well as various internal and external research projects and underground mapping where excavations exist. 7.9.2 Testing Methods There are various methods available to test the material strength of rocks. Two of the most valid, reliable, cost effective and easy to use methods are Rock Quality Designation (RQD) and Point Load Index (PLI). The former provides an estimation of rockmass properties and the latter is designed to give specific rock properties. These are typically conducted as routine tests on site and are performed by site rock engineering and/or geotechnical staff. Where required, International Society for Rock Mechanics and Rock Engineering (ISRM) testing methods are used to assess rock properties at accredited rock testing laboratories in South Africa. These are significantly more expensive than the tests conducted on site and are performed on an adhoc basis. Typically during a feasibility study, and/or where the rock engineer is unsure of specific rock strength or stress data for mine design purposes, will these tests be commissioned. Intact core samples are usually required for such tests and should be handled as per the ISRM sample collection and preparation methods. As the rockmass is not homogeneous, a number of samples are usually submitted for testing and these generate a range of values. The laboratory data is then downgraded (according to specific criteria) for underground in-situ representation for mine design purposes. The information is used to calibrate numerical models for the mine design. As the mine design is being executed, monitoring of the excavations is conducted and the data is used to provide a back analysis of the numerical models. Further optimisation can then be done based on the outcomes of these numerical models. This process is used by all rock engineers in the South African Mining Industry. 83 7.9.2.1 Rock Quality Designation Rock Quality Designation (RQD) is a standard technique in the Mining and Engineering Industries for the qualitative and quantitative assessment of rock quality using the degree of jointing, fracturing, and shearing in a rock mass. RQD is defined as the percentage of intact drill core pieces recovered that are >10cm for a single core run. Therefore, it is indicative of a measure of strength of the rockmass and is used for preliminary macro designs. Therefore, low RQDs will indicate low-quality rockmasses which will require additional geotechnical work to understand the rockmass further before any design work to continue. Contrary to popular belief, high RQD rockmasses will also generate similar needs for design work as the geophysical and geomechanical properties of rocks and rockmasses are not uniform. The general equation for RQD is expressed as: RQD index (%) = 100 × Σ (Length of core pieces ≥ 0.10 m)/(Total length of core run) 7.9.2.2 Point Load Index (PLI) Summary Point Load (PL) is a test that aims at characterizing intact rock strengths. It is an index test, meaning that it can be performed relatively quickly and without the necessity of sophisticated equipment to provide important data on the mechanical properties of rocks. Many more tests can be conducted in this way, as it does not need a laboratory or perfect rock specimens to perform the tests. The test apparatus consists of a rigid loading frame, a loading measuring system and a simple system of measuring the distance between the two platens. Rock samples are compressed between the platens, which is usually about 1,5-10cms apart, so that various sizes of similar rock materials can be tested. The point load index (I s) is the force needed to fracture a sample of rock between conical points: I s = P/D2, where P is force and D is the distance between the points, both at failure. I s is related to uniaxial compressive strength (approximately equal to I s × 24) As such, this test can be used crudely to infer the rock UCS strength value. It is not used widely. 7.9.3 Geotechnical Rockmass Characterisation The main aim of geotechnical characterization is to employ the best possible mine design and support rationale to cater for the varying rockmass conditions. Therefore, the appropriate characterization of the rockmass is imperative. The Sibanye-Stillwater Platinum Operations’ Mechanised Operations: MANDATORY CODE OF PRACTICE to combat Rockfall and Rockburst Accidents, the MCOP, adopts a geotechnical Ground Control District (GCD) methodology to classify areas of the mine plan with different geotechnical parameters. Typically these would consider, depth, type of reef, thickness of the seams and the relative position thereof, hangingwall types and distances to unstable and less cohesive partings; driving forces from joints, major fault zones and shear zones, minor shears and faults, domes, dykes, IRUP, water, pegmatite intrusions, variations in middling between chromitite layers as a result of rolling reefs and potholes, etc. In the deeper reef horizons, strain release from facebursts, rockbursting and seismicity associated with need to be considered.
84 In the conventional tabular operations, the UG2 chromitite Main Seam and the overlying chromitite Leader seam, together with the intervening waste parting, form the mineable reef horizon. The thickness of the Main Seam, the waste parting and the Leader Seam varies across the entire property and in most instances the Leader Seam is mined simultaneously with the Main Seam; however, if the width of the feldspathic pyroxenite parting becomes excessive only the Main Seam is mined, in which case, mining is done along the LT Geotech chromitite parting. The thicknesses of the individual seams that make up the Doublets are also highly variable, as is the distance between the bands forming the Doublets/ triplets horizon. Where the Doublets are situated less than 0.4 m above the top of the Leader Seam, it is mined out, to avoid falls-of-ground. The hanging wall of the Merensky Reef is feldspathic pyroxenite, which grades up into a melanorite and ultimately into a norite and a poikilithic anorthosite, before entering the Bastard pyroxenite unit. The pyroxenite is typically 1 – 3 m thick. The footwall of the Merensky Reef comprises norite/leuconorite and a thin anorthosite layer, which is underlain by norite. Several stratigraphic markers exist in the footwall (Footwall Marker, Brakspruit Marker, and Pioneer Marker), one of which is the Boulder Bed, a poikilithic anorthosite layer, some 20 metres below the reef. Instability within both reef horizons is driven by joints, major fault zones and shear zones, minor shears and faults, domes, dykes, IRUP, water, pegmatite intrusions, variations in middling between chromitite layers as a result of rolling reefs and potholes, and seismicity. Majority of the joints are steep dipping. Contributors to major collapses are shallow dipping structures, parting planes and major fault zones. Water generally acts as an accelerator for deterioration in jointed rock mass. The operations mine through dykes and fault zones that outcrop, with some operations in close proximity to the Hex River and other water features/canals, characterized by blocky rock mass Cover holes and pilot holes are drilled in all development ends to check for ground water and/or gas. These pilot holes are coverage ahead of the advancing excavations. Methods employed to monitor the middling between the various chromitite partings include borehole inspections using borehole cameras, ground penetrating radars (GPRs) and sub-surface profilers (SSPs). Current mining depth ranges from 75mbs to 1300mbs, which is technically considered shallow to intermediate depth. However, from underground support performance observations, conditions mimic deep level gold mining operations. At such depth, strategies are aimed at controlling the tensile zone on a regional basis to prevent large scale rock failure and immediate stope hangingwall to prevent local FOGs in the working area. Stress conditions range from low to moderately high. Stope closure rates vary widely. The Marikana Operations make use of the Institute of Mine Seismology (IMS) system for seismic monitoring. Seismic events in these mines relate to current mining activities traversing geological features, and most notably in the back areas of the stopes and in the deeper mining areas. 7.9.4 Geotechnical Results and Interpretation Using widely used empirical techniques (Bieniawski’s RMR and Barton’s Q rating), rockmasses are classified and included into the GCDs. Both scanline mapping and RMC data are conducted using 85 industry best practices. The appointed rock engineer is responsible for overseeing the collection and capturing of the data. Instrumentation data collection is done according to the OEM provided training that supplies the equipment. In addition, parameters are assimilated and used to assess the mine design using established, approved and recognized numerical modelling techniques. The visual evidence of hand samples, observations made underground, the results of selective laboratory testing and data from geotechnical instrumentation, show that the dominant hanging wall and footwall rocks to be typical of the Critical Zone rocks found across the western Bushveld. Table 18 summmarizes their average material properties and ranges of the same. The UCS values summarized in Table 18 show that the rocks are of moderate to high strength as per ISRM grading. Norite and anorthosite are of higher strength compared to pyroxenite and hence they tend to be brittle in nature. As we have established, general rockmass conditions are catered for with the use of GCDs. However, in some cases, variations in the middling between the chromitite layers may exist, and data is then collected from surface and underground additional core drilling. This is confirmed using geotechnical instrumentation specific to the investigation required. In the instance of variable stable beam thickness, data from instrumentation is used to refine the original geology isopachs that were historically constructed using surface and underground core drilling. In addition, using underground observations and drill core results, RMR and Q are calculated. Marikana RMR values range between 50 and 70 (fair to good rockmasses)for the majority of the mining areas. E Anomalies exist closer to major geological intersections where RMR values may be <35. These areas are treated as Special Areas as per the requirements contained in the MCOP. In general, joint properties are generally dry, planar, smooth/rough and with little to no infill for higher RMR values, and for lower RMR values, discontinuities are damp, smooth, planar/undulating and with thick infill as shown in Table 19. 86 Table 18: Summary of the material properties of the dominant hanging wall and footwall rock types UCS Young’s Brazilian Disc Poisson’s (MPa) Modulus (GPa) Strength (MPa) Ratio Density (kg/m3) Rock Type Av. Range Av. Range Av. Range Av. Range Ave Range Anorthosites Spotted 210 170 - 240 80 75 - 90 14 16-Nov 0.22 0.20-0.25 2,750 2,700-2,800 Mottled 215 170 - 240 85 75 - 90 13.5 15-Nov 0.22 0.18 -0.25 2,750 2,700-2,800 Norites Leuconorite 215 150 - 240 80 75 - 90 15.5 12 – 17 0.22 0.18-0.24 2,750 2,700-2,800 Norite 220 150 - 240 85 75 - 90 15.5 13 – 17 0.2 0.18-0.22 2,800 2,750-2,850 Melanorite 220 160 –240 90 80 - 90 16 13 - 17 0.2 0.18-0.22 2,850 2,750-2,900 Pyroxenite Pyroxenite (Hanging wall and Footwall) 150 135 - 165 115 100 -125 12.5 13-Nov 0.23 0.20-0.26 3,200 3,150-3,300 Table 19: Rock mass classes determined from RMR total ratings and meaning RMR Ratings 81-100 61-80 41-60 21-40 <20 Rock Mass Class A B C D E Description very good rock good rock fair rock poor rock very poor rock 8 Sample Preparation, Analyses and Security 8.1 Sampling Governance and Quality Assurance The QPs are satisfied with the standard procedures, which prescribe methods aligned to industry norms. The governance system at the Marikana Operations relies on directive control measures and makes use of internal manuals (standard procedures) to govern and standardize data collection, validation and storage. Furthermore, the standard procedures are mandatory instructions that prescribe acceptable methods and steps for executing various tasks relating to the ongoing gathering, validation, processing, approval and storage of geological data, which is utilised for Mineral Resource estimation. In addition to internal standard procedures, Sibanye-Stillwater implements an analytical quality control protocol that assesses the extent of contamination and analytical precision at the laboratory. Batches of samples sent to the laboratory include routine “blank” samples (Magaliesburg quartzite) and certified reference material (CRM). Results of the analytical quality control are discussed in Section 8.5.2. 87 The governance system also emphasizes training to achieve the level of competence required to perform specific functions in data gathering, validation and storage. Extensive on the job training of new geologists, who will eventually be responsible for logging and sampling, is performed. Lithological data is acquired through the logging of drill core recovered from underground drilling. The logging is undertaken by trained geologists, who are familiar with the various reefs, footwall and hangingwall stratigraphy and rock types. The core logging is also guided by existing drillhole information from previous core logging. Routine validations are undertaken by the experienced Geologists at various stage gate points in the data collection process flows, with the ultimate validation performed by the QPs. The QPs note that the internal peer review of the data facilitates the early detection of material errors in the data capture before the collection is finalized. Another aspect of the governance system is the documentation of the geological data gathering process flow (i.e., data collection, processing and validation). The QPs acknowledge that this documentation facilitates the auditability of the process flow activities and outcomes, as well as the measures undertaken to rectify anomalous or spurious data. The historic surface core is stored at two facilities located at the Marikana Operations. Storage facilities are fenced off to prevent unauthorized entry, with limited access. 8.2 Reef Sampling – Surface The bulk of the estimates are informed by historical drillholes across Marikana and these inform the indicated and inferred Mineral Resource areas in particular. Sampling practices have evolved over the duration of the data acquisition campaigns and the assumption from the outset is that diligent systems or protocols with respect to the data acquisition have been applied. The three most typical reef deflections exhibiting the most core recovery and condition were selected for sampling, whereas the fourth deflection was not sampled but has been kept for future mineralogical or metallurgical testing. UG2 sampling follows a standard procedure of continuous sampling with 10cm lengths of core from the contacts, where 2 cm overlap into the non-reef is taken, and continues inwards to the centre of the chromitite intersection at 20 cm lengths. A variable sample length is placed towards the middle of the intersection. This differed with the earlier sampling (pre- 1990) where either greater lengths or entire intersections were composited into a single sample. Merensky sampling follows a standard procedure of continuous sampling 10 cm lengths of core. Where chromitite layers occur within the pyroxenite, a 10 cm sample with 5 cm overlap above and below is taken, whereas on contacts, 2 cm overlap is taken. The responsible geologist verifies the sample markings before any core cutting commences. Only half size core is sampled, the remaining half core is stored for reference or re-sampling if necessary. The samples are assigned unique sample identification numbers and tags before the Geologist transports them to the chosen external laboratory. In addition, the samples for each drillhole and the associated quality control samples (CRM and blanks) are submitted to the laboratory. The Geologists prepare sample submission sheets that accompany the samples. Records of the sample data are captured in the SABLE database.
88 8.3 Reef Sampling – Underground 8.3.1 Core Samples At the Marikana Operations, currently no underground drillholes are sampled. Underground drilling is only sampled in special cases or areas where surface drilling information is sparse. An underground drillhole sampling project was executed at the Saffy Shaft between 2015 and 2019 to test the viability of sampling fewer underground channels and supplementing the underground data with drillhole assays. These assayed sections are validated and included in the Mineral Resource estimate. Samples include bottom and top contacts together with 2cm of footwall and minimum of 2cm of hangingwall with the contact samples being no less than 10cm. In addition, at least one sample of unmineralized footwall and hangingwall is included. Samples are broken into individual pieces no less than 20cm for BQ core size to ensure enough material is available for analysis. The entire drillcore sample is submitted to the analytical laboratory and no core splitting is performed. The samples are assigned unique sample identification numbers and tags before the Evaluation Team Leader transports them to the laboratory. In addition, the samples for each drillhole and the associated quality control samples (CRM and blanks) are submitted to the laboratory. The Geologists prepare sample submission sheets that accompany the samples. Records of the sample data are captured in the SABLE database. 8.3.2 Channel Sampling Within underground workings, exposures of the reef have channel samples taken. Individual channels are cut from the underground development-working faces using a diamond saw. A representative section of the target reef intersection should be recorded in the field book and the respective sample numbers, relative to their sequential position, should be reflected relative to the profile, from footwall to hangingwall. The Marikana Operations development channel sampling interval standards vary per shaft and facies. For the UG2 Reef at all shafts samples are taken at 30m intervals on dip and the strike component varies by mining method. For the Merensky Reef, samples are taken at 5m intervals on dip at the western shafts and 10m at the eastern shafts. Channels are defined perpendicular to the reef plane and each section’s position is fixed by offsetting from survey pegs. The reef is segregated according to a sampling pattern and is correlated between sample sections, and individual samples of 10cm – 15cm in length are taken to reflect the internal geometry of the reef, with not less than a 10cm sample being taken on top and bottom contacts. The sample mass taken is in the order of 300 g to 500g. The data is stored in one database but linked to the assay laboratory automatically via a second system. The following capture process is followed. • Sample taken-data entered into MineRP • Draws section-validated location and geology in MineRP • Sampling data from MineRP is linked to MES • Assays received from LIMS and automatically populated via sample ID into tables in MES • QC checks are carried out in MES 89 • Assay data is accepted or rejected in MES and either linked to MineRP MRM or sent back to the laboratory for re-assay and • Final authorized assay and location data is sourced from the MRM database via a standard report extracted as a *.CSV file. 8.4 Sample Preparation and Analysis 8.4.1 Laboratory Samples from Marikana Operations are analysed at the Sibanye-Stillwater owned and operated laboratory. The analytical laboratory is a secure facility as it is situated at the Marikana Operations which is fenced off to prevent unauthorized entry by the public and where access is restricted to authorized personnel of Sibanye-Stillwater. The laboratory has facilities for sample preparation, chemical analysis (via fire assay and instrumental techniques) and is equipped with the Laboratory Information System (LIMS) software, which facilitates effective and efficient management of samples and associated data. It handles mainly grade control samples in the form of belt sampling and underground channel sampling, as well as samples from the concentrators, smelter and base metal refinery and occasionally drillhole samples. The laboratory has received accreditation from the South African National Accreditation System (SANAS) in August 2021 (T0930). Various externally accredited laboratories have been used for the analysis of the historical drillcore data set (Setpoint, Mintek, SGS-Lakefield, and Genalysis). The samples were analyzed for 3PGE+Au (4E) and in some instances Cu, Ni and Cr were also analyzed. However, current assay practice includes the analysis of Pt, Pd, Rh, Au, Ru and Ir precious metals by NiS collection; and Cu and Ni by Atomic Absorption Spectrometry after partial acid digestion of the sampled material. 8.4.2 Sample Preparation and Analysis The fire assay method described below is used specifically in the analysis of Gold, Platinum and Palladium and Rhodium. This technique involves the reduction of Lead oxide, forming elemental Lead, which collects the precious metals. The Lead button formed is cupelled in a muffle furnace to oxidise the Lead to a Lead oxide and a prill composed of the precious metals is obtained. Samples are dried, crushed, and pulverized and analyzed using fire assay techniques. Initial crushing is done to 2mm partial size using a Terminator crusher. The samples are then pulverized in a vertical spindle pulverizer to 80% <150µm. Blank quartzite is used to flush between samples at the crusher and pulverizer. The pulverizer is compressed air cleaned between samples. One sub-sample is weighed out and the remainder of the sample is kept for RD and possible repeat assay should the batches’ blank fail QA/QC or a re-assay be requested. The fire assay method employed for sample analysis comprises two consecutive pyrochemical separations. The pulverized product (50g sample aliquot) is fused with 400 g of RO700 pre-mixed assay flux under reducing conditions, which promotes the separation of the precious metals from the 90 gangue, with simultaneous collection as a lead alloy. One (1) millilitre of 0.01% silver nitrate is also added as a co-collector. A catch weighed nominal amount of 50g of the pulverised samples is mixed with 400g of lead flux and fused at 1,2000C in a fusion furnace before pouring into conical iron moulds. The lead button is separated from the slag before cupellation at 1,0000C to oxidize the lead. After checking for complete cupellation, the cooled prill is transferred to a differently moulded cupel namely a block cupel and placed into the High Temperature Cupellation Furnace at 1,3000C. This is to ensure that all the silver has been volatilised and the prill only contains Platinum, Palladium, Rhodium and Gold known as 4E. This prill is digested in aqua regia before being analysed for Au, Pd, Pt and Rh by gravimetric finish where the weight of the final prill is measured. The technique is considered total. Laboratory reporting of underground sampling results was not split into separate prill split assays. A combined grade is reported. The laboratory has in place quality assurance and control procedures for the analysis and handling of the samples. Scales are calibrated at the start of every shift. An overall high level of cleanliness is maintained to minimize contamination. Furthermore, the laboratory also included standards and blanks in each sample batch and any anomaly identified in the quality control samples is addressed as required. The QA/QC procedures include regular audits, round-robin benchmarking, as well as the submission of blanks and standards to the laboratory. In addition to external audits, the Marikana Mineral Technical Services Management (MTS) department conducts ad hoc audits of the laboratory. 8.4.3 QP Opinion The QPs are satisfied with the sample preparation, analytical methods, accuracy and precision and the level of cleanliness at the analytical laboratory. The analytical methods employed are suited to the mineralization style and grades. Accordingly, the analytical data from the laboratory is a suitable input for grade estimation. Note on historical assays: Fire assay is a well-established procedure and has been used in South African mines for many decades. The procedure has not changed in ways that significantly affect the accuracy and comparability over the life of the mine. 8.5 Analytical Quality Control 8.5.1 Nature and Extent of the Quality Control Procedures Marikana Operations implement an analytical quality control protocol requiring ongoing monitoring of the laboratory performance. No formal QA/QC has been performed on the historical drillhole data set. Similarly, no rejection of reef composites in the estimation process has been made based on the results of the assay QA/QC. During the various earlier drilling campaigns, the samples have been consigned to external laboratories where their internal controls were accepted to be adequate. In 2005, more stringent checks were introduced and only from 2009 onwards, has the QAQC been actively managed. 91 The reliability of the channel sample assays are considered in terms of (i) the laboratory’s own internal controls and (ii) the external controls introduced in 2013 to assess the assurances that the assays meet an acceptable standard. 8.5.2 Quality Control Results Analytical results for the blanks and standards are analysed graphically on control charts to facilitate the identification of anomalous data points (Figure 26 and Figure 27). Where the standard result is reported outside three standard deviations of certificate value – an investigation is requested from the laboratory. The blank material utilised at Marikana Operations has no certified value, and the blank sample data is analysed visually on plots to identify anomalous values that may suggest contamination or sample swapping. Blank samples are accepted to 0.2 g/t 4E after which investigation and re-assay is requested. Figure 26: Example of CRM Result Monitoring
92 Figure 27: Example of Blank Result Monitoring 8.5.3 QP Opinion Based on the foregoing, The QPs conclude that the laboratory’s analytical data shows overall acceptable precision and accuracy, and no evidence of overwhelming contamination by the laboratory that would affect the integrity of the data. As a result, the analytical data from the in-house laboratory is of acceptable integrity and can be relied upon for Mineral Resource estimation. 9 Data Verification 9.1 Data Storage and Database Management All drillhole data (i.e., collar and downhole survey, lithological, geotechnical, structural, analytical, and mineralization data) and TSF data is stored in the SABLE database, which is a Datamine product database designed to standardize information gathering during drilling. The drillhole data is captured directly into the database or imported electronically via Excel spreadsheets. Library tables, key fields and codes are the validation tools available in the SABLE database utilised for ensuring correct entries. The SABLE database is stored on the central IT server, where it is backed up and has rigorous controls (e.g. password protection and access restrictions) to ensure security and integrity of the data. Channel sample data starting from 2006 is saved in the MRM sample database, which is a MineRP product database. The pre-2006 channel data is stored in a company network folder. 93 The QPs are satisfied with data storage and validation as well as database management practices, which are all aligned to industry practice. There are sufficient provisions to ensure the security and integrity of the data stored in the SABLE database. 9.2 Database Verification Internally generated channel samples, underground definition drillhole and mapping data is the primary data utilised for geological interpretation and Mineral Resource estimation. The imports into the database and validations are performed by experienced personnel. The QPs did not perform independent verifications of the data collected but relied on the rigorous validations performed during data collection and processing to which they participated. The Mineral Resource estimates for Marikana Operations are mainly based on validated drillhole and channel sample data, which is stored in the SABLE and MineRP databases. For the 2021 Mineral Resource estimation at Marikana Operations, 52,688 datapoints were used for the UG2 Reef and 27,328 for the Merensky Reef. There were 410 composites accepted into the Mineral Resource estimation dataset for the Marikana TSF. 9.2.1 Mapping Mapping is checked underground by the responsible geologist when conducting start up assessments. The responsible geologist will print a plan when proceeding underground and will ensure that the geological mapping is correct and that all features are recorded. 9.2.2 Drillholes The validation of drillhole data is a continuous process completed at various stages during data collection, before and after import into the SABLE database and during geological interpretation and Mineral Resource estimation. As the QPs are fulltime employees of Sibanye-Stillwater working at the Marikana Operations, they either performed or supervised the validation of the drillhole data after which they approved and signed-off the validated data used for Mineral Resource estimation. The logging is guided by a standard procedure, which standardizes data gathering, and the type of detail required for each drillhole log, and any deviations or anomalous entries are flagged by the inbuilt validations tools available in the SABLE database. Geologists validate the survey data by comparing it against planned coordinates and through visual checks in the MineRP CAD environment. 9.2.3 Channel Sampling The validation of development samples is a continuous process completed at various stages during data collection. Unique barcoded sample numbers are generated and printed by an external service provider, preventing duplicate ticket numbers. Samples are captured into the MineRP database with controls in place, which includes drawing of sections and validation of location and geology by experienced fulltime employees. 94 Plots using the final authorized assays and location data, along with the workings, are printed to ensure that the spatial distribution is correct. Planned Task Observations are conducted quarterly to ensure sampling procedures are followed correctly. 9.3 QP Opinion The QPs acknowledge the rigorous validation of the extensive database utilised for Mineral Resource estimation at the Marikana Operations. The data was validated continuously at critical points during collection, in the SABLE database and during geological interpretation and Mineral Resource estimation. For the recent data, the QPs either participated in or supervised the validations which were performed by suitably trained personnel and approve the use of the validated and signed-off data for Mineral Resource estimation. Similar practices which were inherited by Sibanye-Stillwater were in use by the previous owners for the collection historical data. The QPs have assessed the historical data and concluded that it is suitable for Mineral Resource estimation. In general, the data validations are consistent with industry practice and the quantity and type of data are appropriate for the nature and style of the mineralization. The QP for Mineral Resources was employed by the previous owner of the Marikana Operations and participated in the collection and verification of the data. 10 Mineral Processing and Metallurgical Testwork The plant is well established and no changes are planned. Accordingly, there has not been any recent testwork completed for the purposes of process design and metallurgical amenability assessment as these are unnecessary for operating plants. The type of ore material is consistent with historical processing, and any metallurgical testwork conducted is to support short term operational issues. The plant recovery factors are benchmarked to actual recoveries achieved by the plant and there is no material risk to the planned plant recovery factors. There is no metallurgical testwork that is material to the operational this stage of operation. Metallurgical samples from Marikana Operations are analysed at the Sibanye-Stillwater owned and operated laboratory, refer to Section 8.4.1 for laboratory details. Analytical methods are the same as for the geological samples (Section 8.4). For mineral processing refer to Section 14 and ongoing sampling in the plant refer to Section 14.4. 95 11 Mineral Resource Estimates Mineral Resources are derived from both Underground and Surface Sources. 11.1 Estimation Domains Geological interpretations based on structural, thickness and grade data are used to construct the estimation domains (geozones) (Section 6). 11.1.1 Compositing Selection criteria for composites is based on a minimum mining width of 110cm, a well-defined marker horizon(s) in the economic zones and geotechnical requirements of the hangingwall. There is no maximum mining width. While no cut-off grade is used, the areas with variable width are composited to include as much of the mineralized material as possible within the geotechnical constraints. Where the chromitites are less than the minimum mining width the additional thickness is taken in the footwall. For an explanation of why no cut-off grade is used see Section 11.3.2.2. 11.1.1.1 Merensky Reef The mineralization in the Merensky Reef has the highest PGM concentrations associated with narrow chromitite layers (Upper-, Lower- and Basal-chromitite). The PGM mineralization generally diminishes into the enclosing pyroxenite, but becomes rapidly depleted when approaching the hangingwall norite and footwall anorthosite. See Section 6.3.2.1 and Figure 11. Analysis of the grade distribution for the composite boundary selection was done using histograms produced from the Datamine system. The distributions of 4E grade referenced on different lithological markers were visually inspected in the histograms (Figure 28) to determine the limits of the best average composite for each intersection based on the minimum mining width.
96 Figure 28: Example of a Merensky Reef Composite Histogram The composites were defined either as fixed (110cm) or variable thickness(>=110cm) for which the following five have been identified: • Fixed thickness referenced on hangingwall contact e.g., Eastplats. • Fixed thickness referenced on Upper Chromitite e.g., Westplats at Rowland Shaft, and 4 Belt Shaft. • Fixed thickness referenced on Lower Chromitite e.g. Brakspruit at K3 Shaft, RPM at K3 and K4 shafts (within 50m blocks within the first pass of the search) and Thin at K3 Shaft and 4 Belt. • Variable thickness between Upper and Lower Chromitite e.g. Marikana at K3 and K4 Shaft and RPM at K4 Shaft (within 500m blocks outside of the 50m blocks). This assessment was done concurrently with a review of the facies and estimation geozones using the sampled geological and assay data. 97 11.1.1.2 UG2 Reef Split Reef For the Marikana Operations, composites per lithological unit (i.e., drillhole and channel sample data composted by lithology) are used to inform the Mineral Resource model. Composite boundaries are determined by geological contacts and grade distribution for the following three primary components • Leader Seam • Parting Width Component (internal Waste) • Main Seam A minimum thickness of 110cm is modelled. The composites include Main Seam, Leader Seam and parting width between the Main Seam and Leader (see Figure 12). Where the total composite width is less than 110cm, the additional thickness is made up of the Footwall unit. Where the Leader Seam is developed it creates a point of weakness in the hanging wall and must be removed. For the undercut geozone, the composite includes the Main seam and where the width is less than 110cm, the additional thickness is made up from the Footwall Unit. Normal Reef Composites per lithological unit are used to inform the Mineral Resource model. Within the normal reef facies, where the massive chromitite unit is less than 90cm thick, additional material is added to the cut from the footwall at an assumed grade of zero g/t until the minimum width of 110cm is achieved. TSF Compositing Data were composited into 6 m lengths (the same as the sample interval). Where the auger hole sampled length was not a full 6 m, it was allowed to exist as a composite of 4.5 m, 3.0 m or 1.5 m so that no data were rejected during the compositing process. This situation occurred at the base of many of the holes. As the estimated variable is an accumulation of grade and dry mass per metre the disproportionate impact of the smaller and often higher grade composite lengths at the base of the holes on the estimate is lessened, as they tend to have high moisture and hence low dry mass per metre. 11.1.2 Estimation Domains 11.1.2.1 Merensky Reef The Merensky Reef has predominantly hard (constrained) boundaries, particularly where mineralization is controlled by different geological layers (Figure 29). This means that only the composites within a geozone boundary will inform estimates in the applicable geozone. The facies classification is based on a combination of lithology, the thickness of the Merensky Pyroxenite and the PGM value distribution. For the Merensky Reef, the estimation domains- geozones - are defined by facies and resource composites Sections 6.3.2.1 and 11.1.1.1). 98 Figure 29: Merensky Reef Geozones 11.1.2.2 UG2 Reef Geozones The UG2 Reef has partially constrained boundaries between geozones (Figure 30). For the estimation of the 500 by 500m size blocks, a selection of data using an expanded polygon for a further 500m into the adjacent geozones was selected. The size of the expanded polygon was based on the size of one block so as to avoid extensive extrapolation across fault boundaries. The same approach was applied to the 100m and 50m size blocks. A hard boundary was applied to Geozone 8, where Split Facies exists and which was ring-fenced for the chromitite units. In the extraction of data to estimate the thickness 99 of the internal waste pyroxenite parting in Geozone 8, surface drillholes in the immediately adjacent (within 500m) Geozone 7 were used and assigned a zero (pseudo) thickness for the internal waste. This allows for a more gradual transition in the reef thickness between the two geozones. Figure 30: UG2 Reef Geozones
100 11.1.2.3 Tailings Storage Facility For the TSF estimate, the distribution of values follows a spatial trend rather than abrupt boundaries. There is only one statistical domain. 11.2 Estimation Techniques 11.2.1 Grade and Tonnage Estimation 11.2.1.1 Statistics and Capping The primary software used is Datamine Studio RM for estimation and Snowden Supervisor for statistics and variogram fitting. Based on the structural and geological facies, the Mineral Resource footprint was divided into various geostatistical domains – geozones (Section 11.1.2). The constraints of the geological facies differ between reefs. Detailed exploratory data analysis included sample verification, histogram, cumulative frequency plots, outlier checks, mean vs. covariance and trend analysis. The drillhole data and underground channel sample data were composited on the minimum mining width. The underground channel data informing the 500m blocks were declustered into a 500 by 500 metre grid in order to reduce the weighting on the channel data and increase the weighting and dependency on the surface drillhole deflections within the deeper, longer term areas. After detailed exploratory analysis, it was determined that capping was necessary and several capping ranges were applied to the composite variables based on an assessment of the histogram distribution and likelihood of occurrence. Capping was generally applied at the 99th percentile per geozone where applicable, to reduce the effects of extremely high grades on each estimated panel (Table 20). Figure 31 shows an example of the capping analyses in Snowden Supervisor and shows the effect of capping on the general statistics. Standard variograms were generated and capping was applied where required to enhance or reduce the smoothing of the variance. The capping applied to the variograms is given in Table 21 and Table 22. 101 Table 20: Capping Values Applied to the Final Estimation Dataset Reef Parameter Lower Upper UG2 TTHICK - 1.8 UG2 4E - 15.0 UG2 NIACCUM - 950 UG2 CUACCUM - 350 UG2 PTACCUM - 7000 UG2 PDACCUM - 4500 UG2 RHACCUM - 1400 UG2 AUACCUM - 150 UG2 IRACCUM - 1000 MER TTHICK - - MER 4E - 15.0 Figure 31: Capping Analysis in Snowden Supervisor 102 Table 21: Capping Applied to the Merensky Variogram Data. Variable Accumulation Thickness 4E Composite Facies Geozone Lower Upper Lower Upper Lower Upper CUT 30 110 WP-A 1 - - - - - - CUT 20 110 WP-B 2 - - - - 1 12 30VAR160-80 MAR-A 3 - 15 - 2.5 - 14 30VAR160-80 MAR-C 32 - - - 1.8 - 12 FWC 40 110 BRAK-1 4 - - - - - 11 FWC 30 110 BRAK-2 41 - - - - - 18 FWC 50 110 BRAK-3 42 - - - - - - FWC90 120 RPM-S 5 - - - - - 12 40VAR16080F30 RPM-N 51 1.5 - - 1.5 1.8 - 30VAR18080F10 RPM-N 52 1 8.5 - 1.5 1.5 8 FWCT 7040 THIN-4B 6 - - - - - 12 FWCT 6050 THIN-K3 61 - - - - 0.3 20 CUT 00 140 EPF-N 7 - - - - 1 - CUT 00 120 EPF-S 8 - - - - - 6 CUT 40 110 WP-C 9 - - - - - 10 CUT 00 110 PAND 10 - - - - - - 103 Table 22: Capping applied to UG2 Reef Variogram Data. Variable Accumulation Thickness 4E Geozones Lower Upper Lower Upper Lower Upper 1 - 12 0.8 1.5 - 10 2 - 10 0.9 1.8 2.5 8 3 - 12 0.8 1.55 2.0 10.5 4 - 12 0.8 1.8 2.0 8 5 - 12 0.8 1.7 - 10 7 - 12 0.8 1.55 - 11 8upper 0.1 2.2 - 0.65 - 10 8lower 1.0 7.5 0.45 1.2 - 11 9 - 13 0.6 1.8 - 13 10 - - - - - - 11 - 10 - 1.4 - 10 12 - - - - - 10 11.2.1.2 Variogram Modelling and Estimation Parameter Selection The variography analyses for the Merensky and UG2 Reefs individual geozones was conducted using the validated composites for the combined underground channel and surface drillhole data. No transformation of the data was applied to the variograms as the data distribution approaches a normal distribution for thickness, grade and accumulation where there are sufficient composites. The variograms were treated as isotropic due to the absence of anisotropic trends which is a common phenomenon of the PGM Reefs within the Bushveld Complex. No convincing anisotropic effect was noticed as depicted in the example in Figure 32. Variogram parameters used for kriging are available in Table 23. Snowden Supervisor is used for variogram maps( Figure 32), and variography as per examples in Figure 33.
104 Figure 32: Example of a Variogram Map Figure 33: Example of Variogram for 4E Grade and Thickness 105 Table 23: Summary of Variogram Model Parameters Block Size Parameter Geozone NUGGET ST1PAR1 ST1PAR4 ST2PAR1 ST2PAR4 ST3PAR1 ST3PAR4 50x50, 100x100, 500x500 cm.g/t 1 0.52 10 0.3 32 0.15 140 0.03 cm.g/t 2 0.52 18 0.42 100 0.06 - - cm.g/t 3 0.52 18 0.19 24 0.2 145 0.09 cm.g/t 4 0.52 39 0.22 129 0.12 490 0.14 cm.g/t 5 0.52 7 0.3 52 0.1 625 0.08 cm.g/t 6 0.52 2 0.2 30 0.18 625 0.1 cm.g/t 7 0.44 43 0.43 1911 0.13 - - cm.g/t 8 0.43 49 0.43 268 0.02 2000 0.12 cm.g/t 9 0.52 7 0.29 61 0.07 450 0.12 cm.g/t 10 0.52 9 0.17 48 0.28 235 0.03 cm.g/t 11 0.52 15 0.27 103 0.12 255 0.09 cm.g/t 12 0.52 57 0.45 155 0.03 - - 50x50, 100x100, 500x500 tthick 1 0.17 10 0.7 124 0.07 2240 0.06 tthick 2 0.17 10 0.72 68 0.09 760 0.02 tthick 3 0.17 8 0.6 64 0.2 1800 0.03 tthick 4 0.17 45 0.32 594 0.21 1800 0.3 tthick 5 0.17 23 0.66 135 0.07 2710 0.1 tthick 6 0.17 10 0.6 67 0.16 1850 0.07 tthick 7 0.3 68 0.07 426 0.05 2800 0.58 tthick 8 0.39 66 0.4 271 0.09 850 0.12 tthick 9 0.17 9 0.58 78 0.08 970 0.17 tthick 10 0.17 24 0.59 78 0.16 400 0.08 tthick 11 0.17 18 0.53 64 0.11 476 0.19 tthick 12 0.17 67 0.47 146 0.29 410 0.07 50x50, 100x100, 500x500 4egrade 1 0.45 14 0.35 40 0.17 255 0.03 4egrade 2 0.45 12 0.46 140 0.09 - - 4egrade 3 0.45 18 0.42 80 0.13 - - 4egrade 4 0.45 25 0.43 100 0.12 - - 4egrade 5 0.45 10 0.35 52 0.12 630 0.08 4egrade 6 0.45 8 0.36 50 0.12 500 0.07 4egrade 7 0.52 11 0.2 39 0.26 100 0.02 4egrade 8 0.53 21 0.34 418 0.03 1936 0.1 4egrade 9 0.45 4 0.28 36 0.15 195 0.12 4egrade 10 0.45 20 0.16 47 0.38 125 0.01 4egrade 11 0.45 14 0.35 170 0.2 - - 4egrade 12 0.45 10 0.12 46 0.32 150 0.11 106 Block Size Parameter Geozone NUGGET ST1PAR1 ST1PAR4 ST2PAR1 ST2PAR4 ST3PAR1 ST3PAR4 500x500 BM & PGM NIACCU M 0.11 325 0.89 - - - - BM & PGM CUACCU M 0.2 340 0.8 - - - - BM & PGM CRACCU M 0.18 320 0.82 - - - - BM & PGM PTACCU M 0.34 61 0.43 200 0.23 - - BM & PGM PDACCU M 0.34 109 0.28 290 0.38 - - BM & PGM RHACCU M 0.35 61 0.41 270 0.24 - - BM & PGM AUACCU M 0.33 134 0.29 360 0.38 - - BM & PGM IRACCUM 0.06 50 0.65 388 0.29 - - BM & PGM RUACCU M 0.19 69 0.24 940 0.57 - - BM & PGM TTHICK 0.15 318 0.85 - - - - 500x500 BM&PGM - 8U&L NIACCU M 0.11 325 0.89 - - - - BM&PGM - 8U&L CUACCU M 0.2 340 0.8 - - - - BM&PGM - 8U&L CRACCU M 0.18 320 0.82 - - - - BM&PGM - 8U&L PTACCU M 0.34 61 0.43 200 0.23 - - BM&PGM - 8U&L PDACCU M 0.34 109 0.28 290 0.38 - - BM&PGM - 8U&L RHACCU M 0.35 61 0.41 270 0.24 - - BM&PGM - 8U&L AUACCU M 0.33 134 0.29 360 0.38 - - BM&PGM - 8U&L IRACCUM 0.06 50 0.65 388 0.29 - - BM&PGM - 8U&L RUACCU M 0.19 69 0.24 940 0.57 - - The Mineral Resource block widths (BWs) were estimated using variography results from thickness (CW) analysis. CW was interpolated using Ordinary Kriging (OK). Kriging Neighbourhood Analysis (KNA) is a tool which assists in determining the appropriate estimation parameters as per the examples below. KNA determined appropriate block sizes of 50m x 50m, 100m x 100m and 500m x 500m (Figure 34). These have positive kriging efficiencies (KE) and slope of regression (SR). The discretization KNA shows a stable KE for the different matrices. The value used in the estimation was 5x5x1 (Figure 35). There is no more improvement in the KE with finer discretization. The KNA for the number of samples for the 50m x 50m blocks provides the KE vs SR relationship (Figure 36). The results for 500m x 500m blocks are shown in Figure 37. There is no more improvement in the KE with more samples. KNA is run in Datamine Studio RM using a proprietary script “Macro”. The results for the KNA analysis are summarized in Table 24. 107 Figure 34: KNA for Block Sizes Figure 35: KNA for Discretization
108 Figure 36: KNA Number of Samples 50x50 Block Size Figure 37: KNA Number of Samples 500x500 Block Size 109 Table 24: Kriging Parameters Data Block Size Minimum number of samples Maximum number of samples Search Volume No. 2 Minimum number of samples Maximum number of samples Search Volume No. 3 Minimum number of samples Maximum number of samples Point Data 50mx50m 12 64 Point Data 100mx100m 12 32 500x500 Regularized CH sample data All surface drillhole data. 500mx500m 12 32 2 12 32 10 12 32 11.2.1.3 Interpolation Methods The two-dimensional block model is informed by (i) vali dated composite data, (ii) par ameters extracted from the variography and kriging neighbourhood studies, and (iii) resu lts of geological studies including geological facies domains, dip, geological loss, and alteration. The model is constructed at zero elevation (which is a 2D modelling approach); has 4E grade, thickness, accumulation and density interpolated into three sets of blocks (cells) 50mN by 50mE, 100mN by 100mE and 500mN by 500mE by interpolation method ordinary kriging. In addition, base metals (Cu and Ni), Cr and 6E prill splits (Pt, Pd, Rh, Ir, Ru and Au) were also interpolated into 500mN by 500mE blocks by ordinary kriging. All these block models are combined to generate the final Mineral Resource Block Model. For the Merensky Reef, a probability approach was applied to the estimation Geozone 9 (Westplats C facies) at the 4B Shaft in order to more accurately represent the proportion of Thin facies. The two main facies types mined at the shaft are the Westplats-C and Thin facies. Previously the Thin facies was domained using available channel sample information, but due to the breast mining layout and wide sample spacing, the facies variability was potentially being underestimated. The Thin facies domains were subsequently removed at 4B Shaft. The probability model uses stope observation points as well as underground channel information to predict percentage probability of encountering Westplats or Thin facies per estimation block. Using stope observation points allows the facies variability to be better represented between underground channel samples which are spaced far apart. The grade assigned to each block is calculated using the probability percentage and applying this proportionally to the Westplats-C and Thin facies composites per block. For the UG2 Main and Leader Seams as well as the Parting unit of the Split Reef facies, the thicknesses were estimated separately for each using Ordinary Kriging. These were then joined to form a single 110 model layer for the Split Reef geozone. The grade for the Main and Leader Seams were estimated using Ordinary Kriging. Due to a lack of sampling data, a nominal grade of 0.01 g/t was applied to Parting unit. Within the Split Reef geozone to the west of K3 Shaft, only the Main Seam of the Split Reef UG2 will be developed and mined. This will be done to undercut the Parting unit and the Leader Seam. The boundary of this geozone with the Split Reef geozone is informed by a Parting unit thickness of greater than 25cm. For this undercut geozone, the grade and thickness of the Main Seam was estimated using Ordinary Kriging and joined to the Split Reef model. No consideration of geotechnical cuts was applied to the Mineral Resource selection. Local areas where the triplets in the hangingwall rest close to the UG2 Reef result in dilution, which is accounted for in the dilution models in the Mineral Reserve modelling. Validation Block models are validated on several levels including visual checks comparing block grades to sample grades, swath plots comparing actual recovered grades to predicted grades and sampling grades, as well as reconciliations comparing previous estimations to the current estimation. An example of a swath plot used for validation is shown in Figure 38, a value distribution plot showing year on year comparison is shown in Figure 39. Block Models for the reefs are shown in Figure 40 and Figure 41. Figure 38: Swath Plot Showing Block Model vs Data 111 Figure 39: Value difference plot for the UG2 Reef showing percentage difference 4E Grade 2019 versus 2020. Figure 40: UG2 Reef 4E Grade Block Model.
112 Figure 41: Merensky Reef 4E Grade Block Model. 11.2.2 Grade Control and Reconciliation Grade control and reconciliation practices follow similar procedures to those applied elsewhere on the Bushveld Complex. The reefs, hanging wall and footwall lithologies are visually identifiable, and channel sampling ensures that the face grade is monitored accordingly. As part of the reconciliation exercises, physical factors, including channel width, stoping width, dilution and Mine Call Factor, are monitored and recorded on a monthly basis. Monthly evaluation is carried out by means of histograms drawn from the underground sampling data that evaluate the current mining block against the business plan. Stoping and development is measured monthly to provide an accurate broken ore tonnage and 4E PGM oz estimate that is compared to the budgeted tonnes hoisted, trammed and milled on a monthly basis. The 4E PGM grade accounted for by the processing plant is in turn compared to the Survey Called For grade to determine the Mine Call Factor. Belt sampling is performed daily at all shafts, for both reefs to verify underground grades. Year on year reconciliations are performed per shaft and facies on completion of an updated Mineral Resource model. Table 25 and Table 26 below show the Marikana Operations reconciliations for the Merensky and UG2 Reefs, respectively. 113 Table 25: Reconciliation of the Merensky and UG2 Reef Models per Shaft 2021/2022 SHAFT RESOURCE TTHICK GEOLOSS 4E Content TTHICK GEOLOSS 4E Content TTHICK 4E Content TTHICK GEOLOSS 4E Content PLANNING (m) % (g/t) cmg/t (4E Moz) (m) % (g/t) cmg/t (4E Moz) (m) (g/t) (4E Moz) cmg/t (m) (g/t) (4E Moz) 4B MER 1 YEAR 1.11 7.44 3.72 414.47 0.05 1.11 6.36 3.95 440.46 0.05 0.00 0.23 0.00 6.27 -0.01 -1.08 6.28 4.69 3 YEAR 1.14 9.33 3.89 441.82 0.14 1.13 8.87 4.02 456.01 0.13 0.00 0.13 0.00 3.21 -0.08 -0.46 3.30 -3.17 K3 MER BP22 1.14 13.07 5.06 578.72 0.09 1.13 10.14 4.79 541.96 0.09 -0.01 -0.26 -0.01 -6.35 -1.19 -2.92 -5.22 -6.56 BP21 YR2 1.14 11.59 5.11 582.43 0.10 1.13 8.63 4.85 549.34 0.09 -0.01 -0.25 -0.01 -5.68 -0.74 -2.97 -4.98 -8.39 3 YEAR 1.18 11.90 5.12 605.60 0.32 1.15 9.62 4.83 556.89 0.29 -0.03 -0.28 -0.03 -8.04 -2.65 -2.28 -5.54 -9.59 ROW MER1 YEAR 1.21 7.75 3.91 472.76 0.09 1.13 5.43 3.95 446.71 0.08 -0.08 0.03 -0.01 -5.51 -6.33 -2.32 0.87 -5.78 3 YEAR 1.20 9.10 4.00 481.37 0.16 1.17 7.39 3.99 466.21 0.15 -0.04 -0.01 -0.01 -3.15 -3.02 -1.71 -0.14 -4.99 K4 MER 1 YEAR 1.19 14.79 4.30 513.50 0.01 1.19 14.79 4.30 513.56 0.01 0.00 0.00 0.00 0.01 0.00 0.00 0.01 0.01 3 YEAR 1.19 14.55 4.48 534.86 0.15 1.19 14.55 4.48 535.22 0.15 0.00 0.00 0.00 0.07 0.04 0.00 0.03 0.03 MERENSKY COMPARISON BP21 BP22 ABSOLUTE DIFF BP22-BP21 % DIFF BP22-BP21 Table 26: Reconciliation of the UG2 Reef Models per Shaft 2020/2021 114 11.3 Mineral Resource Classification 11.3.1 Classification Criteria The Mineral Resource is reported as in-situ Mineral Resource inclusive and exclusive of Mineral Reserves. The Mineral Resource is classified with varying levels of confidence ranging from Measured, high confidence, in current mining and sampling areas to Inferred, lower confidence, in areas further away from current workings. The Mineral Resource classification is determined using the classification matrix method, which has been implemented across the PGM operations of Sibanye-Stillwater. It consists of various geological and statistical components. The following geological parameters are considered into the different frameworks (Table 27) Table 27: Confidence Levels for Key Criteria for Mineral Resource Classification Items Discussion Confidence Aeromagnetic survey Available aeromagnetic data is available and data appears of reasonable quality and has been derived from internationally recognized and procedures and techniques. High Seismic interpretation Available seismic data is available and data appears of reasonable quality and has been derived from internationally recognized and procedures and techniques. High Structural model Stratigraphic definition and delineation are considered of reasonable quality. Major structures identified. High Facies interpretation Facies definition and delineation are considered of reasonable quality. Major changes to facies model identified. High Historical data Available data appears of reasonable quality and has been derived from internationally recognized and procedures and techniques. High Assay - QAQC QA/QC programme employed. QA/QC monitoring in place and regular follow ups occur with the mine laboratory. Moderate Kriging variance Parameter is based on the standardized kriging variances (KV). Ranked values assigned are: where KV<0. 2, the ranked value is given a value of 1 (high confidence); where 0.2≤KV<0.4, a value of 2 is assigned; and where KV≥0.4, a value of 3 is applied (low confidence). Moderate Kriging efficiency Ranked values for kriging efficiency assigned are: where KE≥0.5, the ranked value is given a value of 1 (high confidence); where 0.3<KE<0.5, a value of 2 is assigned; and where KE≤ 0.3, a value of 3 is applied (low confidence). Moderate Search volume Ranked values assignment are: first search radii = 1 (high confidence); second search radii = 2; third search radii = 3. High Number of samples The range between the minimum and maximum number of samples is divided into three and assigned values of 1, 2 and 3 where 1 would represent the maximum number of samples interval. High 115 Items Discussion Confidence Regression slope Ranked values assigned are: where RS≥0.6 the ranked value is given a value of 1 (high confidence); where 0.2<RS<0.6, a value of 2 is assigned; and where RS≤0.2 a value of 3 is applied (low confidence). Moderate For the geological parameters, a set of up to three categories of polygons is constructed for each element that represents the confidence in the areas encapsulated. The polygons applied are considered as ‘confidence polygons’, i.e. they indicate areas of greater or lesser confidence. For the statistical parameters, ranked values are assigned based on the criteria given in the table above. A weighting file that defines how significant the parameters are relative to one another and to the particular orebody is created. The weighted scores of the eleven elements are then calculated per model cell and the final classification is determined as follows: • Where the weighted score lies between 1 and 1.5: then the cell is deemed to be measured • Where the weighted score lies between 1.5 and 2.5: then the cell is deemed to be indicated • Where the weighted score is greater than 2.5: then the cell is deemed to be inferred Figure 42 and Figure 43 depict the Mineral Resource Classification for each reef. The Mineral Resource classification for 2021 has not changed from 2020 Mineral Resource classification.
116 Figure 42 : Mineral Resource Classification for the Marikana Merensky Reef 117 Figure 43: Mineral Resource Classification for the Marikana UG2 Reef 11.3.2 Mineral Resource Technical and Economic Factors 11.3.2.1 Mining Width and Geological Losses The minimum mining width, which represents the minimum practical selection unit, is dependent largely on the mining method and other mining constraints, including rock engineering. For conventional mining methods, the typical minimum mining width used is 110cm in the operating shafts and 205cm for mechanised mining methods in the project areas. The Mineral Resources are discounted for geological losses. Geological losses can be separated into known and unknown losses. Typically, faults and dykes, which have been positioned through various exploration/exposure methods, can be reasonably quantified as known losses and with high or medium degrees of confidence. Where the measurements become conjectural, low confidence is assigned to these losses and would then form part of the unknown loss quantification. Geological losses for UG2 and Merensky Reefs were estimated and signed off by the QP per geological loss domain for each shaft. Losses are estimated in the underground mining operations and are then projected into the future mining areas. Additional data sources that include aeromagnetic survey, seismic interpretation and drillhole information are also used for the projected loss estimated and are shown in Figure 44 for the UG2 Reef. 118 Figure 44: Mineral Resource Geological Loss Factors for Marikana UG2 Reef In summary the total weighted average geological loss at Marikana Operations for the remnant resource is 12.02% and represents a 0.3% increase from the previous year’s geological losses. These geological losses were estimated from the previous year remnant Mineral Resource-Reserve areas. 11.3.2.2 Paylimits and Cut-off Grade Historically, SSW has not applied cut-off grades in their Mineral Resource /Mineral Reserve declaration. No cut-off grade is applied to the Mineral Resources quoted due to there being no mining selectivity based on the grades being applied at any of the Shafts at Marikana. The ore bodies are continuous and have persistent metal distribution profiles which has been used as the basis for reef identification, modelling and exploitation. To illustrate the prospects for economic extraction at the Mineral Resources cut-off grade calculations were made based on economic, mining and processing assumptions. The metal prices assumed in the calculation are the long-term prices (as at 2022) in Table 28 . See Section 16.4 for a discussion on price determination. 119 Table 28: Commodity Price and Exchange Rate Assumptions for Cut-off Calculations* 6E Metals Units Long Term Prices 2022 Platinum USD/oz 1,500 Palladium USD/oz 1,500 Rhodium USD/oz 10,000 Gold USD/oz 1,800 Iridium USD/oz 3,000 Ruthenium USD/oz 350 ZAR/USD 15.00 A basket price for the 6E metals was calculated by weighting each price by the metal’s contribution to the 6E value for each reef package per individual operation. The contribution of base metals was not considered. The prill splits used per operation are shown in Table 29 Table 29: 6E Prill Split Percentages Applied per Reef Marikana MER UG2 Surface Platinum 0.57 0.48 0.47 Palladium 0.26 0.23 0.21 Rhodium 0.03 0.09 0.09 Gold 0.07 0 0 Iridium 0.01 0.04 0.04 Ruthenium 0.06 0.16 0.18 Certain parameters were used in the cut-off calculations and include both mining and processing assumptions below and in Section 12.4.2. The first factor used is the Resource to Reserve factor and is calculated by factoring in the percentage of grade lost in the conversion from Mineral Resource to Mineral Reserve grade. Typically this would be due to dilution, Mine Call Factor and other modifying factors applied to the Mineral Resource. Concentrator recoveries used were based on 2022 budgeted figures per reef type, per operation and represent the average concentrator recovery for the total operation. Net smelter returns are assumed to be the same across the operations, although the material are processed at different facilities. The total mining cost applied per operation were the costs declared in the December 2021 Mineral Resource and Mineral Reserve declaration and were assumed to be the same for both reef types.
120 The parameters assumed for the cut-off calculation for the MR and UG2 packages are detailed in Table 30. Table 30:Parameters Used in the Cut- off Calculation for the MR and UG2 Reef Operation Parameters Unit MR UG2 Marikana Total Mining Cost ZAR/t 1,853 1,188 Mining Recovery % 100 92 Plant Recovery % 85 85 Net Smelter Return % 99 99 MCF % 100 100 Based on the parameters assumed above for the cut-off calculation for the MR and UG2 packages, the following cut-off grades were calculated for the three operations and these are detailed in Table 31. The 6E grades were used in the calculation and reported here as 4E. Table 31:Cut-off Grades Calculated for the MR, UG2 Reef and Surface Operations. Marikana MER UG2 Surface Cut-off grade(4E – g/t) 2.08 1.73 0.43 The Mineral Resource tonnes and metals available at the cut-off grades calculated are no different from what is obtained using a 0 g/t cut-off grade. The Mineral Resources at Marikana Merensky and UG2 have no tonnes or metals below cut-off. Due to this, all available blocks are reported to be available for mining. 11.4 Mineral Resource Statements 11.4.1 Mineral Resources Mineral Resources are stated as Exclusive (Table 33 and Table 34) and Inclusive of Mineral Reserves ( Table 35 and Table 36). Mineral Resources are for in-situ mineralisation (reference point) assessed to have reasonable prospects for economic extraction by the QP. The Mineral Resource as stated is not sensitive to changes in the PGM basket price, nor the ZAR/USD exchange rates. Therefore no sensitivity analysis has been completed for Mineral Resources. 121 The Prill Split for the Mineral Resources is given in Table 32. Table 32: Prill Split Mineral Resources (Inclusive of Mineral Reserves) 4E Prill split Pt % Pd % Rh % Au % UG2 59.32 28.93 11.17 0.57 Merensky 61.63 28.07 3.20 7.10 Avg 60 29 9 3 TSF 60.9 27.2 11.9 - Notes on the Mineral Resource Tabulations: • Mineral Resources are not Mineral Reserves. • Mineral Resources have been reported in accordance with the classification criteria of Subpart 1300 of Regulation S-K. • Attributable Mineral Resource for 2020 is 95.25% of the total Mineral Resource. Attributable Mineral Resource for 2021 is 80.64%. • Mineral Resource is calculated on available blocks. Due to non-selective mining, no cut-off grade is applied, no recovery factor is applied. • AI = Above Infrastructure; BI = Below Infrastructure • Mineral Resources are reported after the removal of geological losses. • Quantities and grades have been rounded to one decimal place, therefore minor computational errors may occur. • Technical and economic factors are discussion in Section 11.3.2. • Risks are Discussed in Section 21. The QP is aware that there is a small discrepancy in the Mineral Resources exclusive of Mineral Reserves between the tonnage extracted from digital models and calculated by subtracting the Mineral Reserves. This due to the methods of extracting information from the digital models. Marikana’s methodologies have not been set up to routinely do this calculation as historically Mineral Resources exclusive of Mineral Reserves were not required to be reported. The “missing” tonnes are pillars and other areas within the Mineral Reserve boundaries not converted to Mineral Reserves. Marikana is reviewing its systems to modify the reporting to give a more accurate estimate of Mineral Resources exclusive of Mineral Reserves. 122 Table 33: Mineral Resources Exclusive of Mineral Reserves as at 31 December 2021 at 100% Classification – 4E PGM Tonnes (Mt) 4E Grade (g/t) 4E (Moz) 21-Dec 20-Dec 21-Dec 20-Dec 21-Dec 20-Dec Underground Measured (AI) 59.2 58.3 3.9 3.9 7.5 7.5 Measured (BI) Indicated (AI) 168.8 175.1 4.0 4.0 21.8 22.6 Indicated (BI) 318.1 302.9 3.9 4.2 39.7 40.8 Total Measured and Indicated 546.1 536.3 3.9 4.1 69.0 70.6 Inferred (AI) 19.3 17.6 4.4 4.4 2.8 2.5 Inferred (BI) 202.2 194.5 4.4 4.6 28.4 28.6 Total Underground 767.6 748.4 4.1 4.2 100.2 101.7 Total (AI) 247.3 251 4.0 4.0 32.1 32.3 Total (BI) 520.3 497.4 4.1 4.3 68.1 69.4 Surface Indicated TSF 0.0 0.0 - - 0.0 0.0 Total Surface 0.0 0.0 - - 0.0 0.0 Total Resource 767.6 748.4 44.1 4.2 100.2 101.7 Table 34: Attributable Mineral Resource Exclusive of Mineral Reserves as at 31 December2021 Classification – 4E PGM Tonnes (Mt) 4E Grade (g/t) 4E (Moz) 21-Dec 20-Dec 21-Dec 20-Dec 21-Dec 20-Dec Underground Measured (AI) 47.7 55.5 3.8 3.9 5.8 6.9 Measured (BI) Indicated (AI) 136.1 166.8 4.2 4 18.2 21.5 Indicated (BI) 256.5 288.5 4 4.2 32.9 38.9 Total Measured and Indicated 440.3 510.8 4 4.1 57 67.3 Inferred (AI) 15.5 16.8 4.1 4.4 2 2.4 Inferred (BI) 163.1 185.3 4.4 4.6 23.1 27.2 Total Underground 618.9 712.9 4.1 4.2 82.1 96.9 Total (AI) 199.4 239.1 4.1 4 26.1 30.8 Total (BI) 419.6 473.8 4.1 4.3 56 66.1 Surface Indicated TSF 0.0 0.0 - - 0.0 0.0 Total Surface 0.0 0.0 - - 0.0 0.0 Total Resource 618.9 712.9 4.1 4.2 82.1 96.9 123 Table 35: Mineral Resources Inclusive of Mineral Reserves as at 31 December 2021 at 100% Classification – 4E PGM Tonnes (Mt) 4E Grade (g/t) 4E (Moz) 21-Dec 20-Dec 21-Dec 20-Dec 21-Dec 20-Dec Underground Measured (AI) 90.8 81.1 4.2 4.1 12.3 10.6 Measured (BI) Indicated (AI) 308.1 332.5 4.5 4.5 44.4 47.9 Indicated (BI) 318.1 302.9 3.9 4.2 39.7 40.8 Total Measured and Indicated 717.0 716.5 4.2 4.3 96.4 99.4 Inferred (AI) 19.6 17.8 4.4 4.5 2.8 2.5 Inferred (BI) 202.2 194.5 4.4 4.6 28.4 28.6 Total Underground 938.8 928.8 4.2 4.4 127.6 130.6 Total (AI) 418.5 431.4 4.4 4.4 59.5 61.1 Total (BI) 520.3 497.4 4.1 4.3 68.1 69.4 Surface Indicated TSF 10.5 11.5 1.2 1.2 0.4 0.4 Total Surface 10.5 11.5 1.2 1.2 0.4 0.4 Total Resource 949.3 940.3 4.2 4.3 128.0 131.0 Table 36: Attributable Mineral Resource Inclusive of Mineral Reserves as at 31 December 2021 Classification – 4E PGM Tonnes (Mt) 4E Grade (g/t) 4E (Moz) 21-Dec 20-Dec 21-Dec 20-Dec 21-Dec 20-Dec Underground Measured (AI) 73.3 77.3 4.2 4.2 9.9 10.5 Measured (BI) Indicated (AI) 248.4 316.7 4.5 4.5 35.8 45.9 Indicated (BI) 256.5 288.5 3.9 4.2 32 39.1 Total Measured and Indicated 578.2 682.5 4.2 4.4 77.7 95.6 Inferred (AI) 15.7 16.9 4.4 4.5 2.2 2.4 Inferred (BI) 163.1 185.3 4.4 4.6 22.9 27.2 Total Underground 757 884.7 4.2 4.4 102.9 125.2 Total (AI) 337.4 410.9 4.4 4.5 48 58.9 Total (BI) 419.6 473.8 4.1 4.4 54.9 66.4 Surface Indicated TSF 8.4 11.5 1.2 1.2 0.3 0.3 Total Surface 8.4 11.5 1.2 1.2 0.3 0.3 Total Resource 765.5 896.2 4.2 4.4 103.2 125.7
124 Figure 45: Conversion of Mineral Resource to Mineral Reserve For the Marikana Operations Mineral Resource to Mineral Reserve Reconciliation (Figure 45), the starting point shows the total Mineral Resource (after removal of geological loss) for the operations for both the Merensky and UG2 Reefs. The 80.8MOz that is removed are Mineral Resource areas that are not yet included into Mineral Reserves and are defined as future mining areas, areas that would be regarded as Mineral Inventory or remnant areas that need to be investigated for possible exclusion from Mineral Resources. The pillars and mining loss component is based on an average calculation for designed pillars for all operating shafts that have existing mine designs. The mining loss is assumed to be 6.3% of the total Mineral Reserve, guided by historical mining loss factors used at Marikana. Modifying factors as discussed in Section 11, may be either a gain or loss of Mineral Resource and for summary purposes have been included into one item. The MCF at Marikana is 98.2% and makes up the total MCF loss in the reconciliation. Total Mineral Reserves declared are after removal of MCF losses. 125 11.4.2 Mineral Resources per Mining Area (Inclusive Mineral Reserves) Mineral Resource statements per mining area, Inclusive and Exclusive of Mineral Reserves at 31 December 2021 are given in Table 37. Table 37: Mineral Resource Inclusive of Mineral Reserves per Mining Area as at 31 December 2021 at 100% 4E PGM per Mining Area Measured Indicated Inferred Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) 4B 6.6 4.29 0.9 3.1 4.51 0.4 2.7 4.60 0.4 K3 13.3 4.64 2.0 12.9 4.72 2.0 0.1 5.59 0.0 Rowland 12.7 4.68 1.9 49.5 4.93 7.8 11.4 4.34 1.6 Saffy 13.4 4.84 2.1 28.5 4.73 4.3 0.0 0.0 E3 7.3 4.64 1.1 1.3 4.69 0.2 0.0 0.0 K4 6.0 4.83 0.9 114.7 5.19 19.2 1.4 9.21 0.4 C&M Shafts 4.2 4.77 0.6 6.9 5.07 1.1 0.1 5.07 0.0 Projects 27.5 3.17 2.8 409.4 3.72 49.0 206 4.34 29 Total Underground 90.8 4.22 12.3 626.2 4.17 84.0 221.8 4.38 31.2 Total: Surface TSF 10.5 1.17 0.4 Grand Total (Underground and Surface) 90.8 4.2 12.3 636.6 4.12 84.4 221.8 4.38 31.2 11.4.3 Changes in the Mineral Resources from Previous Estimates (Inclusive of Mineral Reserves) The C2022 estimation varies from the C2021 as shown in the waterfall graph (Figure 46). Mineral Resource depletion due to mining is 1.18 Moz. Changes due to geological losses and interpretation of structure and facies updates resulted in an increase of 1.9 Moz. There were no material changes to the estimation or classification parameters between December 2020 and December 2021. The portion attributable to other stakeholders(3rd Party) is 24.8Moz. 126 Figure 46: Marikana Operations Mineral Resource Reconciliation 11.5 QP Statement on the Mineral Resource Estimation and Classification The Mineral Resources declared are estimated based on the geological facies and constrained by appropriate geostatistical techniques, using Ordinary Kriging. The Resource classification follows geostatistical and geological guidelines. The Mineral Resources are declared inside the structural blocks and outside of the mined-out areas. No cut-off grade is applied. The minimum mining unit is the shaft and its accessible volumes. The underlying grade control and reconciliation processes are considered appropriate. It is the QP’s opinion that all issues relating to any technical or economic factors that would be l ikely to influence the condition of reasonable prospects for economic extraction are addressed or can be resolved with further work. 12 Mineral Reserve Estimates 12.1 Mineral Reserve Methodology This section includes discussion and comments on the conversion of Mineral Resources to Mineral Reserves. Specifically, the comments are given on the modifying factors, specific inclusions and exclusions. 127 12.2 Mine Planning Process The following planning process applies at the Marikana Operations: • Appoint and ensure competence in mine planning responsibilities per section • Consider planning cycle for which plan is to be prepared • Obtain an updated geological structural model for design purposes • Obtain/determine planning levels for each business unit • Break these down per individual operation • Liaise with business unit management teams and brief anticipated production levels • Evaluate historical efficiencies against future planned efficiencies and reach an agreement of planning performance levels • Provide base plans for each individual business unit and determine numbers of crews and scheduling systems • Document and file all planned advance rates • Review tunnel dimensions with ventilation, rock engineering, evaluation and mining engineering teams • Agree and reach consensus on all stoping layouts, ledging and extraction sequencing/methodologies • Review and sign off with all appropriate Business Unit Management Teams • Document the planned parameters in a shaft or unit planning brief • Continue updating the design of mine plan. Specify capital and ensure naming of each working place, etc. • Review development and stoping mine design with appropriate business unit management team members and ancillary support staff including Mine Technical Services competencies • Modify if required, or accept and commence with scheduling based on agreed scheduling parameters per area • Review schedules and outputs in terms of production (Multi-Disciplinary Reviews), to ensure appropriate levels of production and volume efficiencies are obtained for that unit. Modify and revise as required • Consolidate all sections to create an overall operational performance plan • Run evaluation module/grid and determine PGM’s output • Provide shaft or unit based data in terms of volume and grade into the acceptable standard database and reporting format • Review the consolidated plan (Multi-Disciplinary). Revise and review again if required • Submit for final review with Senior Vice Presidents and Vice Presidents of Operations to ensure operational targets and performance levels are reached • Submit to the Financial Department for total mine financial evaluation • Identify all areas where differences in design can or may require additional feasibility study work in the future. These would include declines, new shafts, and alternative layouts. • Review mining plan with rock engineers and provide data sets for design modelling. Obtain the support of acceptance of plan as far as rock engineering is concerned
128 • Review mining plan with occupational health (ventilation) engineers and provide data sets for design modelling. Obtain written support of acceptance of plan as far as occupational health is concerned • Review with all mining engineering staff and gain acceptance and commitment to plan. Generate and provide appropriate schedules and plans for all Manager Operations • Consider alternative scenarios relating to rates of advance, alternative layouts, and risk mitigation • Formally document all capital projects and compile consolidated project report for each project • Prepare Operational/ Strategic Plan presentation to Corporate Executive Committee. Modify and amend where required • Complete final cycle of planning process and document all parameters. Make a digital backup of Mineral Reserve model, design model, schedule model, all associated worksheets/presentation • Roll out and communicate final plan to all Business Units. Confirm and identify all critical development and • Review and modify on a monthly basis actual achievements vs. planned volumes. 12.3 Historical Mining Parameters The planning parameters are primarily based on historical achievements. Table 15 provides the historical mining performance for Marikana, where mining expenditures are stated in nominal terms. Historical mining statistics for the shafts from C2016 to C2020, as well as historical averages are provided in Table 38: Table 38: Historical Mining Statistics by Section Shaft Units C2016 C2017 C2018 C2019 C2020 C2021 K3 Primary Reef Development (m) 32.663 27.714 26.903 25.091 21.506 23.167 Primary Waste Development (m) 9.11 4.609 7.721 8.433 5.791 7.575 Stoping Square metres (m2) 442.182 483.724 449.426 375.847 282.231 357.85 Tonnes Milled (kt) 2.604 2.976 2.742 2.414 1.739 2.075 4E ounces M&C (oz) 280.13 314.973 279.297 233.7 174.543 223.723 4B Primary Reef Development (m) 5.581 4.121 3.409 3.259 3.709 3.101 Primary Waste Development (m) 2.56 799 1.622 2.05 1.617 1.532 Stoping Square metres (m2) 296.965 242.686 244.076 198.265 163.457 181.46 Tonnes Milled (kt) 1.547 1.245 1.244 1.147 879 953 4E ounces M&C (oz) 149.001 118.04 108.849 93.764 72.841 87.746 Rowland Primary Reef Development (m) 17.933 13.462 17.258 20.223 14.011 19.253 Primary Waste Development (m) 6.862 5.377 5.142 4.796 3.797 5.715 129 Shaft Units C2016 C2017 C2018 C2019 C2020 C2021 Stoping Square metres (m2) 311.876 330.952 313.976 269.857 174.845 238.535 Tonnes Milled (kt) 1.759 1.938 1.834 1.662 1.019 1.299 4E ounces M&C (oz) 198.496 214.388 193.542 172.067 105.044 135.571 Saffy Primary Reef Development (m) 23.945 17.323 13.788 13.673 11.17 10.271 Primary Waste Development (m) 7.41 4.471 5.66 5.716 5.314 5.348 Stoping Square metres (m2) 322.001 345.312 355.716 287.985 228.36 301.314 Tonnes Milled (kt) 2.036 2.182 2.195 1.757 1.426 1.852 4E ounces M&C (oz) 224.34 246.229 250.152 194.617 156.137 201.227 E3 Primary Reef Development (m) 1.43 721 436 1.223 2.628 2.377 Primary Waste Development (m) 1.156 543 818 1.286 1.087 1.383 Stoping Square metres (m2) 89.528 107.606 125.113 116.368 91.63 108.281 Tonnes Milled (kt) 524 557 691 596 551 622 4E ounces M&C (oz) 60.672 66.704 77.174 64.22 57.498 67.762 Total Underground Marikana Operations Primary Reef Development (m) 81.552 63.341 61.793 63.468 53.024 58.169 Primary Waste Development (m) 27.098 15.799 20.962 22.281 17.606 21.553 Stoping Square metres (m2) 1,462,552 1,510,279 1,488,308 1,248,323 940.525 1,187,440 Tonnes Milled (kt) 8.47 8.898 8.706 7.576 5.613 6.802 4E ounces M&C (oz) 912.639 960.333 909.013 758.368 566.063 718.03 12.4 Shaft and Mine Paylimits 12.4.1 Paylimits • No pay limits are applied to the Mineral Resources and Mineral Reserves. There is no mining selectivity based on the grades applied at any of the Shafts at Marikana operations. • With the Merensky and UG2 Reefs having a low grade variability, all available blocks are reported to be mined, essentially, a blanket mining approach is applied. • Refer to Section 11.3.2.2 for more information on paylimits and cut-off grades. 12.4.2 Modifying Factors and LoM plan The QP has used an overall 100% MCF for Merensky Reef and 100% for the UG2 Reef. The monthly milled tonnes and recovered 4E PGM Oz allocated to each shaft is based on the proportion of tonnes and 4E PGM content delivered by each shaft to the Plant. Belt sampling is done on every shaft, and every belt has a weightometer. The results of the belt sampling are used for quality control only. 130 Table 39 provides details of the historical and projected modifying factors. Table 40 and Table 41 present the LoM plan. Dilution is variable across the property and is included in the stope tramming width. A separate dilution factor is not used as a modifying factor. The Mineral Reserve classification of Proved and Probable was largely a function of the Mineral Resource classification with due consideration of the minimum criteria for the “Modifying Factors” as considered: • Mining • Metallurgical • Processing • Infrastructural • Economic • Marketing • Legal and Environmental, social and governmental factors. Table 39: Mineral Reserve Modifying Factors C2022 Marikana Unit C2019 C2020 C2021 C2022 Survey Called For Grade Merensky Reef g/t 3.2 3.2 3.5 3.4 UG2 Reef g/t 3.8 3.8 4.0 4.0 Total g/t 3.6 3.6 3.8 Stope Tramming Width Merensky Reef (cm) 139 140 138 140 UG2 Reef (cm) 143 137 140 141 Total (cm) 142 138 141 Waste Mining Percentage Merensky Reef (%) 2 2 2 2 UG2 Reef (%) 1 0 1 1 Total (%) 1 1 1 Reef Development to Mill Merensky Reef (%) 14 18 8 9 UG2 Reef (%) 14 15 9 7 Total (%) 14 16 8 Mine Call Factor Merensky Reef (%) 93 99 100 100 UG2 Reef (%) 94 102 100 100 Total (%) 94 101 100 100 Plant Recovery Factor Merensky Reef (%) 89 88 88 88 131 UG2 Reef (%) 85 83 84 84 Total (%) 86 55 85
132 Table 40: LoM Plans – Current Operations 2022-2031 Marikana Operations Units LoM C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 C2030 C2031 1 2 3 4 5 6 7 8 9 10 Underground Primary On-Reef Development (m) 372,651 50,091 43,052 33,600 22,761 20,462 18,007 13,459 10,862 9,048 7,589 Primary Off-Reef Development (m) 474,431 33,528 33,772 28,851 25,404 22,923 20,220 16,620 14,634 13,846 13,523 Mill Tonnes (kt) 168,345 7,525 7,752 8,364 7,556 7,339 6,985 6,796 6,702 6,525 5,414 4EOunces in Mill Feed (kOzt) 22,029 929 966 1,062 977 953 910 891 886 870 720 Recovery (%) 86.2 84.8 84.7 84.6 84.6 84.7 84.8 84.9 85.1 85.1 85.3 Yield (g/t) 3.51 3.25 3.28 3.34 3.40 3.42 3.44 3.46 3.50 3.53 3.53 4E Produced (kOzt) 18,998 787 818 898 826 807 772 757 754 741 614 Surface Mill Tonnes (kt) 10,451 3,728 3,681 3,041 - 4EOunces in Mill Feed (kOzt) 306 106 107 94 - Recovery (%) 25.6 25.6 25.6 25.6 - - - - - - - Yield (g/t) 0.23 0.23 0.23 0.25 - - - - - - - 4E Produced (kOzt) 78 27 27 24 - Total Mine Mill Tonnes (kt) 178,796 11,253 11,434 11,405 7,556 7,339 6,985 6,796 6,702 6,525 5,414 4EOunces in Mill Feed (kOzt) 22,335 1,034 1,072 1,155 977 953 910 891 886 870 720 Recovery (%) 85.4 78.7 78.8 79.8 84.6 84.7 84.8 84.9 85.1 85.1 85.3 Yield (g/t) 3.32 2.25 2.30 2.52 3.40 3.42 3.44 3.46 3.50 3.53 3.53 4E Produced (kOzt) 19,076 814 845 922 826 807 772 757 754 741 614 133 Table 41: LoM Plans – Current Operations 2032-2071 Marikana Operations Units 2032- 2036 2037- 2041 2042- 2046 2047- 2051 2052- 2056 2057- 2061 2062- 2066 2067- 2071 11-14 15-19 20-24 25-29 30-34 35-39 40-44 45-50 Underground Primary On-Reef Development (m) 29,238 20,186 19,876 20,418 22,534 15,853 13,544 2,070 Primary Off-Reef Development (m) 55,373 39,958 39,281 36,311 35,226 29,330 14,121 1,511 Mill Tonnes (kt) 20,044 13,152 11,551 11,469 11,683 11,560 10,305 7,623 4E Ounces in Mill Feed (kOzt) 2,654 1,711 1,413 1,377 1,470 1,529 1,507 1,205 Recovery (%) 85.2 86.9 88.0 88.0 88.0 88.0 88.0 88.0 Yield (g/t) 3.51 3.51 3.35 3.28 3.44 3.62 4.00 4.33 4E Produced (kOz) 2,261 1,486 1,243 1,211 1,292 1,345 1,326 1,060 Surface Mill Tonnes (kt) 4E Ounces in Mill Feed (kOzt) Recovery (%) Yield (g/t) 4E Produced (kOzt) Total Mine Mill Tonnes (kt) 20,044 13,152 11,551 11,469 11,683 11,560 10,305 7,623 4E Ounces in Mill Feed (kOz) 2,654 1,711 1,413 1,377 1,470 1,529 1,507 1,205 Recovery (%) 85.2 86.9 88.0 88.0 88.0 88.0 88.0 88.0 Yield (g/t) 3.51 3.51 3.35 3.28 3.44 3.62 4.00 4.33 4E Produced (kOzt) 2,261 1,486 1,243 1,211 1,292 1,345 1,326 1,060 134 12.5 LoM Projects There are no LOM projects. 12.6 Specific Inclusions and Exclusions The decision on whether to include or exclude potential mining areas is based on a detailed review, which includes: • Health and safety considerations • Economic viability • Technical justification • Ability to mine the area and • Infrastructure availability constraints. All areas included in the LoM plan are mined from current infrastructure. 12.6.1 Specific Exclusions • Below Infrastructure areas at all shafts • Areas with adverse ground conditions after evaluation by Rock Engineering and other Service Departments and mining and • Off Reef areas where there is no other need such as Ventilation or infrastructure. 12.6.2 Specific Inclusion • Areas required for Ventilation or specific infrastructure development. 12.7 Mineral Reserve Estimation The tonnage and grades scheduled in Measured Mineral Resources classified as Proved Mineral Reserves and those in the Indicated Mineral Resources classified as Probable Mineral Reserves. No Measured Mineral Resources were converted to Probable Reserves. Mineral Reserve estimation at Marikana Operations is based on the development of an appropriately detailed and engineered LoM plan and technical studies at the pre-feasibility level, which accounts for all necessary access development and stope designs. The terms and definitions are those given in United States Securities and Exchange Commission's (SEC's) Subpart 1300 of Regulation S-K. Further, in presenting the Mineral Reserve statements and associated sensitivities, the following applies: • All Mineral Reserves are quoted as at 31 December 2021 • All Mineral Reserves are quoted at prices listed in Table 86 to Table 88Table 88 in Section 16.4 • All Mineral Reserves are quoted in terms of the expected RoM grades and tonnage as delivered to the metallurgical processing facilities, and therefore the quantities reported account for dilution 135 • Mineral Reserve statements include only Measured and Indicated Mineral Resources modified to produce Mineral Reserves and contained in the LoM plan • All Mineral Reserves are evaluated to at least a Pre-Feasibility level within cost limits as given in Section 18 and • All references to Mineral Resources and Mineral Reserves are stated in accordance with Subpart 1300 of Regulation S-K. The Mineral Reserves are derived following the production of a LoM plan by incorporating modifying factors into the Mineral Resource model. All design and scheduling work is undertaken within Cadsmine. The planning process incorporates appropriate modifying factors based on the reconciliation exercises described and the use of technical economic investigations. The mill tonnes are quoted as the forecast mill delivered metric tonnes and RoM, grades, inclusive of all mining dilutions and 4E PGM losses except mill recovery. Mining dilution includes other material, which is waste that is broken on the mining horizon, other than on the stope face and includes unknown geological losses. Mineral Reserves classification is given in Figure 47.
136 Figure 47: Mineral Reserves Classification as at 31 December 2021- Merensky Reef 137 Figure 48: Mineral Reserves Classification as at 31 December 2021- UG2 Reef 138 12.8 Surface Sources Surface sources refer to low grade waste and processed materials, from a Tailings Storage Facility (TSF) at the Marikana Operation. 12.9 Mineral Reserves Statement The Mineral Reserve is declared separately for underground and surface sources. The Prill Split for the Mineral Reserves is given in Table 42. Refer to Table 43 and Table 44 for the Mineral Reserve for the Marikana Operation. Mineral Reserves per shaft are given in Table 45 and Table 46. Figure 49 shows the main changes year on year are due to various factors. Notes on the Mineral Reserves • Mineral Reserve was reported in accordance with the classification criteria of Regulation S-K 1300. • Attributable Mineral Reserve for 2020 is 95.25% of the total Mineral Reserve. Attributable Mineral Reserve for 2021 is 80.64%. • Mineral Reserve was estimated on all available blocks and no cut-off grade was applied. • Where Au grade is less than 0.05g/t the value will reflect as zero(0) in the table. • Where Au is less than 0.05Moz the value will reflect as zero(0) in the table. • Mineral Reserves are estimated using the prices in Section 16.4. • Risks are discussed in Section 21.1.2. Table 42: Prill Split and Recovery for Mineral Reserves Prill Split Pt Pd Rh Au Recovery % % % % % Merensky 61.63 28.07 3.20 7.10 88% UG2 59.32 28.93 11.17 0.57 84% Combined (weighted average) 60.26 28.59 7.95 3.21 86.2% Table 43: Mineral Reserve as at 31 December 2021 at 100% Classification - 4E PGM Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Dec-21 Dec-20 Dec-21 Dec-20 Dec-21 Dec-20 Underground 139 Proved 28.0 20.5 3.9 3.9 3.6 2.6 Probable 140.3 148.7 4.1 4.1 18.5 19.6 Total Underground 168.3 169.2 4.1 4.1 22.0 22.2 Surface TSF Proved TSF 0.0 0.0 - - 0.0 0.0 Probable TSF 10.5 14.1 0.9 1.2 0.3 0.5 Total Surface 10.5 14.1 0.9 1.2 0.3 0.5 Total Proved 28.0 20.5 3.9 3.9 3.6 2.6 Total Probable 150.8 162.8 3.9 3.9 18.8 20.1 Total Reserve 178.8 183.3 3.9 3.9 22.3 22.7 Table 44: Attributable Mineral Reserve as at 31 December 2021 at 80.64% Classification - 4E PGM Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Dec-21 Dec-20 Dec-21 Dec-20 Dec-21 Dec-20 Underground Proved 22.6 19.6 3.9 3.9 2.9 2.4 Probable 113.2 141.6 4.1 4.1 14.9 18.7 Total Underground 135.8 161.2 4.1 4.1 17.8 21.1 Surface TSF Proved TSF 0.0 0.0 - - 0.0 0.0 Probable TSF 8.4 11.5 0.9 1.2 0.2 0.4 Total Surface 8.4 11.5 0.9 1.2 0.2 0.4 Total Proved 22.6 19.6 3.9 3.9 2.9 2.4 Total Probable 121.6 153.1 3.9 3.9 15.1 19.1 Total Reserve 144.2 172.7 3.9 3.9 18.0 21.6
140 Table 45: Mineral Reserve per Mining Area as at 31 December 2021 at 100% 4E PGM per Mining Area Proved Probable Dec-21 Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) 4B 1.6 3.5 0.2 0.8 3.6 0.1 2.4 3.5 0.3 K3 4.4 3.9 0.5 9.8 4.0 1.2 14.2 3.9 1.8 Rowland 6.3 3.9 0.8 10.7 4.1 1.4 17.1 4.0 2.2 Saffy 5.9 4.1 0.8 23.0 4.0 3.0 29.0 4.1 3.8 E3 4.3 4.0 0.6 0.8 4.1 0.1 5.1 4.0 0.7 K4 5.4 3.9 0.7 95.3 4.1 12.6 100.6 4.1 13.3 Total Underground 28.0 3.9 3.6 140.3 4.1 18.5 168.3 4.1 22.0 Total: Surface TSF 0.0 0.0 0.0 10.5 0.9 0.3 10.5 0.9 0.3 Grand Total (Underground and Surface) 28.0 3.9 3.6 150.8 3.9 18.8 178.8 3.9 22.3 141 Table 46: Attributable Mineral Reserve per Mining Area as at 31 December 2021 at 80.64% 4E PGM per Mining Area Proved Probable Dec-21 Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) 4B 1.3 3.5 0.1 0.6 3.6 0.1 2.0 3.5 0.2 K3 3.6 3.9 0.4 7.9 4.0 1.0 11.4 3.9 1.4 Rowland 5.1 3.9 0.6 8.6 4.1 1.1 13.8 4.0 1.8 Saffy 4.8 4.1 0.6 18.6 4.0 2.4 23.4 4.1 3.0 E3 3.5 4.0 0.4 0.6 4.1 0.1 4.1 4.0 0.5 K4 4.3 3.9 0.5 76.8 4.1 10.2 81.2 4.1 10.7 Total Underground 22.6 3.9 2.9 113.2 4.1 14.9 135.8 4.1 17.8 Total: Surface TSF 0.0 0.0 0.0 8.4 0.9 0.2 8.4 0.9 0.2 Grand Total (Underground and Surface) 22.6 3.9 2.9 121.6 3.9 15.1 144.2 3.9 18.0 142 Figure 49: The Marikana Operations Mineral Reserve Reconciliation at 31 December 2021 12.10 Mineral Reserve Sensitivity • Mineral Reserves are not sensitive to cut-oof grade as no cut-off grade is applied (sections 11.3.2.2 and 12.4. • With the UG2 and Merensky Reefs having low grade variability, all available blocks are reported to be mined, essentially a blanket mining approach. • Profitability analysis is carried out based on Cost and Revenue variability with the minimum mining unit being the Reserves accessed by the shaft. • Cost sensitivity for the entire operation is given in Section 19. 12.11 QP Statement on the Mineral Reserve Estimation The Mineral Reserves declared are estimated from detailed LoM plans developed per shaft and are based on the Mineral Resource Estimates as at 31 December 2021 together with a set of modifying factors based on recent historical achievements. The assumptions applied in determining the modifying factors are reasonable and appropriate and the LoM plans were developed with a bottom- up approach that is sufficient in detail to ensure achievability. All the inputs used in the estimation of the Mineral Reserves have been thoroughly reviewed and can be considered technically robust. The QP considers the modifying factors to be based on a robust historical database of several years history and no material changes are anticipated that will have a significant bearing on the estimation process. Risks are further discussed in Section 21. 143 13 Mining Methods 13.1 Introduction This section includes discussion and comments on the mining engineering related aspects of the LoM plan associated with Marikana Operations. Specifically, the comments are given on the mining methods, geotechnics, geohydrology and mine ventilation. The K3, 4B and Rowland shafts mine both the Merensky and UG2 Reef horizons with Saffy and E3 shafts only mining the UG2 Reef. On the Merensky Reef horizon, towards the eastern side of the Marikana Operations footprint, there is a decrease in the grade as the Reef thickness to over 10m and an increase in structural complexity. Transportation distances underground on all shafts are increasing and are factored into the production efficiencies. The dip of the reef is on average between 9 and 11 degrees on both reef horizons. The dip mining method is far more development intensive than breast mining. There is also a mining mix constraint of approximately 25% Merensky and 75% UG2 Reef brought about by processing requirements with regards to chrome, copper and nickel content. A typical Mine layout is shown in Figure 50 and Figure 51.
144 Figure 50: Typical Merensky Reef Mine Layout 145 Figure 51: Typical UG2 Reef Mine Layout 13.2 Shaft Infrastructure, Hoisting and Mining Methods 13.2.1 Shaft Infrastructure Marikana Operations are a large, established shallow to mid-level depth platinum mine that is accessed from surface through numerous incline and vertical shaft systems with 31 Level (currently the deepest working level) some 1,003m below surface at Rowland Shaft in the UG2 decline. Marikana comprises of five producing shaft systems, two incline shafts from the surface, two vertical and sub decline complexes and one vertical shaft complex. Two old shafts, W1 and E1 act as second escape ways for Rowland and Saffy shafts, respectively and hence require some care and maintenance with associated costs. The shaft length and depth factors at Marikana are all depicted in the shaft layout sections in the figures below (Figure 52 to Figure 56). Figure 52: 4B Shaft Layout Section Figure 53: K3 & K3A Shaft Layout Section 147 Figure 54: Rowland Shaft Layout Section Figure 55: Saffy Shaft Layout Section
148 Figure 56: E3 Shaft Layout Section 13.2.2 Hoisting The hoisting capacity of the shafts is given in Table 47. Unconstrained capacity is the maximum capacity of the shaft. The constrained capacity is the reduced capacity due to load shifting. Load shifting reduces the available capacity by reducing the operating hours. This is done to reduce power costs by not operating during peak power grid hours. Table 47: Hoisting Capacities of the Marikana Shafts Shaft Operating Capacity(tpm) 5-year Planned production(tpm) 4B Shaft 168,000 73,000 K3 Shaft 290,000 181,000 Rowland Shaft 260,000 141,000 Saffy Shaft 220,000 164,000 E3 Shaft 110,000 49,000 K4 210,000 105,000 13.2.3 Mining Methods The underground mining method across the Marikana Operations is predominantly conventional, using dip mining, breast mining or a combination of both (Figure 57). The mining method to be used is dependent on the ground conditions and structural complexity within each shaft block area. E3 Shaft is predominantly breast mining. The plan going into the future is to convert the other shafts from dip mining to breast mining. No backfilling is used on underground operations. There are no open pit operations. 149 Primary waste footwall haulages are developed on strike approximately 20 to 25m below the reef with crosscuts 70m apart. The reef is accessed from a short cross cut through an inclined travelling way. The stope preparation drives (SPDs) connect the raises which are developed on the reef along dip to connect to the level above. The raises are the main access to the stopes and are used for removing broken ore to the tip at the bottom of each mining block. On the dip layout each raise has a box hole in the footwall haulage. On a dip layout ore is extracted from two 14m wide half panels on either side of the raise allowing throw blasting for optimized cleaning. Mining blocks are separated by dip pillars with pillar width increasing with depth below surface. For breast mining footwall haulages are placed deeper in the footwall in order to accommodate a cross cut and short travelling way to reef per raise line. In this layout the box holes are placed in the cross cut. Raises are placed between 120 and 150m apart, breast panels are generally 25m in length and are advanced on strike away from the raises in either one or both directions. Ore is removed via advanced strike gullies which connect the panels to the raise. Panels are separated by strike pillars which have a 2m ventilation holing spaced approximately 17m apart. Stope width averages around 1.4m and hand held pneumatic rock drills with air legs are used for stope face drilling and ore is cleaned to the tips with conventional winch driven scrapers and transported to the main tips on each mining level with rail bound equipment. Figure 57: Schematic Diagram of the Underground Mining layout. 150 13.3 Geotechnical Analysis The Technical Report Summary (TRS) has been compiled with generally appropriate input from qualified rock engineers. Strategic planning and major design issues were completed with the relevant input from the responsible rock engineers. The primary aspects making up the geotechnical analysis are • Geotechnical conditions • Stress and seismological setting • Regional and local support 13.3.1 Geotechnical Conditions Major structures/fault zones intersect the orebody at most operations. Structures of note are • Saffy and E3 – There is a major parting plane above the reef which forms a critical beam that ranges from 3,0m to 20,0m in thickness. This plane determines the support design of limited panel spans as well as the use of grout packs as primary in-stope primary support on these shafts. • Marikana Fault – West boundary of Rowland Shaft and east of K3 and 4B shafts. • Spruitfontein fault – Situated towards the west of the K3 block and east of 4B. This structure affects both reef horizons. • Elandsdrift fault – On the east boundary of Rowland Shaft. • Hossy Dyke – North of Rowland shaft. Mitigation strategies are in place for these structures; these include lower mining rates, bracket pillars, secondary and tertiary support, increasing support density as well as decreasing panel spans near these structures. 13.3.2 Stress and seismological setting Major seismicity from fault/dyke slip or pillar failure/punching at any of the Marikana operations has not occurred. The pillar system employed at current mining depths is such that seismicity from this source is highly unlikely. However, as mining ventures deeper, there is a necessity to install appropriate seismic monitoring systems that are capable of locating seismic events. These are planned for Saffy, Rowland, Karee3 and Karee4 shafts. 13.3.3 Regional and Local Support The MCOP details and guides the rock engineering discipline in the production of detailed designs based on the parameters contained in the previous sections. The purpose of regional support systems is to reduce volumetric closure, compartmentalise stopes by limiting excessive spans, and reduce Energy Release Rate (ERR). Stabilizing pillars are required to provide efficient regional support. The stabilising pillars can take the form of either geological losses or reef pillars, which will influence the extraction ratio. Limited research has been done into the design of 151 stabilizing regional pillars for the platinum industry, and the design principles applied in the gold industry are therefore applied and adapted to be as appropriate as possible. Marikana operations employ a “stable” rigid pillar system up to a mining depth of approximately 700mbs. These in-stope pillars support both the local hanging wall beams and act as regional support in that they carry the overburden rock mass to surface. The pillar sizes are span dependent and increase/decrease in width proportionally to an increase/decrease in the designed inter-pillar span. At approximately 700 mbs and below, pillars become inefficient in that the behaviour thereof can no longer be accurately predicted. The pillars therefore become very large, posing a seismic risk and entrapping large volumes of ore resulting in sub economic mining. Mining with rigid pillars are only considered to the depth where crush pillar mining can safely be employed. Inter-pillar spans are determined by means of beam analysis. The beam theories applied are: • Voussoir beam theory • Tens ile height Cognisance is taken with regard to dead weight layers and where applicable, cantilever effects. Inter-pillar spans are designed to be self-supporting as far as is possible before introducing in-stope support (Lonmin Mine Design Criteria). At Saffy and East3 the mining layout is based on breast and dip panels with 27m-30m inter pillar spans and strike or dip oriented pillars planned at 14m lengths with 2m wide holings for ventilation purposes. Karee3 and 4Belt shaft the mining layout is based on breast and dip panels consisting of 31m long panels with 16m x 20m pillars with 2m x 3m holings in the Merensky section. 30m panels with 14m x 20m pillars with 2m x 3m holings in the UG2 section. At Rowland shaft the mining layout is based on breast and down-dip panels with 30,0m inter pillar spans on the UG2 and 31,0mm inter-pillar spans on Merensky reef. The strike and dip oriented pillars planned at 14m lengths with 2m wide holings for ventilation purposes. 13.4 Mine Ventilation All projects and new infrastructure designs incorporate detailed ventilation modelling and recommendations as part of normal feasibility planning processes under the auspices of the competency head of Environmental Engineering. All underground mines are demarcated into mining ventilation districts. The ventilation design is based on the velocity of 1.0 m/s for trackless mining. Sporadic flammable gas intersections are encountered on the shafts. These intersections are well controlled by the Flammable Gas Code of Practice and procedure. Continuous gas measuring instruments and a telemetry system are used to detect Carbon Monoxide in the operations.
152 13.5 Refrigeration and Cooling No refrigeration is planned for any of the current working shafts, i.e. K3, 4B, Rowland, Saffy and E3 Shafts. They are above the thermal threshold of 1100m below the surface. Only the K4 shaft is equipped with a refrigeration plant; no refrigeration is planned for any other working shafts. 13.6 Flammable Gas Management Sporadic flammable gas intersections are encountered on the shafts. These intersections are well controlled by the procedures as described in the Flammable Gas Code of Practice. Continuous gas measuring instruments and an extensive telemetry system are used to detect flammable gas and Carbon Monoxide on the operations. 13.7 Mine Equipment The following major mine equipment (Table 48) is installed and utilised at the Marikana Conventional Operations. Table 48: Major Mine Equipment Major Equipment Quantity Locos 194 Chairlifts 6 Winches 809 Rock Winder 2 Emergency Generators 10 Trackless Mobile Machinery 12 Decline Winders 3 Loaders 64 Main Pumps 8 Man Winders 3 Surface Conveyors 16 Surface Vent Fans 9 Transformers 39 U/G Conveyors 2 Surface & U/G Sub Stations 22 Service Winder 1 Mini Subs 72 Shaft Conveyors 5 Koepe Winder 1 Headgear Lift 1 Decline Conveyors 5 153 Conveyors 14 Vent Fans 6 13.8 Personnel Requirements Personnel requirements and related information are available in Sections 4.5 and 17.2. 13.9 Final Layout Map Refer to Section 12.7 and Figure 47 and Figure 48 for the distribution of Mineral Reserves and mined out areas. 14 Processing and Recovery This section covers the metallurgical and mineral processing aspects associated with Marikana. Specifically, detail and comment are provided on the process metallurgy and process engineering aspects relating to plant capacity, metallurgical performance and metal accounting practices as incorporated in the LoM plan. 14.1 Processing Facilities All metallurgical processes and technology in place at the ore processing, smelting and refining facilities (Figure 58) are appropriate, well-proven and aligned to norms and practices in the PGM sectors. The processing methods were selected on the basis of test work carried out as part of feasibility studies at the time. However, the results of the test work have been superseded by actual operational data and experience accumulated over several years of continuous successful operation of these facilities. Ore is processed at one of eight concentrators, of which two are on care and maintenance. The concentrate is delivered as a slurry to the smelter. The smelter filters, dries and melts the concentrate in order to extract PGMs and base metals from the gangue material. The Smelter produces a converter matte that contains the extracted PGMs and base metals. The converter matte is processed at the Base Metal Refinery to separate the base metals (Ni and Cu) from the PGMs. The PGM concentrate from the Base Metal Refinery is processed at the Precious Metals Refinery where it is refined into the individual PGM metals (Pt, Pd, Au, Rh, Ru & Ir). Marikana has access to all material requirements through local suppliers or international suppliers. 154 Figure 58: Schematic diagram of the overall process flowsheet. 14.2 Concentrators The Marikana Operations has eigth concentrators. Six of the concentrators treat underground material and two of the concentrators treat surface or tailings material. The concentrators are identified as follows: • •K3 Mix (underground ore) • •K3 UG2 (underground ore) • •K4 (underground ore) • •EPL (underground ore) • •EPC (underground ore) • •BTT (tailings treatment) • •ETTP (tailings treatment) The Rowland and EPC concentrators are on care and maintenance. The K3 Mix and K3 UG2 Reef concentrators are situated within the same geographical area. They are considered a single entity from management, reporting and costing perspective, but they are regarded as two different concentrators from a metallurgical perspective. The concentrators typically treat Merensky, UG2 or a blend of Merensky and UG2 Reef. The blend of material fed to the concentrators can be adjusted to meet operational requirements. The concentrators all employ a similar flowsheet. A primary mill-float with a secondary mill–float configuration is followed by multi-stage cleaning of the primary and secondary rougher concentrates. 155 Each plant produces a high grade concentrate from the primary flotation circuit and a low grade concentrate from the secondary flotation circuit. The concentrates are mixed together prior to dispatch to the smelter. The valuable constituents of these concentrates are the PGMs and associated base metals. Some of the concentrating plants have a crushing circuit where the ore is broken down to –20mm. This crushed ore is fed into a primary mill where it is ground into fine slurry. Other concentrating plants feed RoM ore directly into the primary milling stage. The resulting slurry is fed through a series of flotation and milling stages. The tailings from some of the UG2 concentrators are fed into a plant where chrome concentrate is extracted using a spiral gravity concentration circuit. The resulting concentrate is sold under contract to outside companies for further beneficiation. On some of the concentrators, the tailings from the chrome plants is further treated by milling and flotation to produce an additional PGM and base metals rich concentrate which is sent to the smelter for further processing. Tailings are thickened prior to disposal to the TSF where the solid material is settled and the clear water decanted and returned to the concentrator plant. The following major process equipment (Table 49) is installed and utilised at the Marikana Concentrators Table 49: Major Process Equipment Utilised at Concentrators Major Equipment Quantity 11 kv 1 20 MVA Transformers 4 35 Ton Cranes 3 Air blowers 4 Air compressors 2 Auto claves horizontal 3 Auto claves vertical 2 Ball Mills 19 Boilers 4 Compressors 17 Cone crusher 5 Convertors 3 Conveyors 11 Floation cells 300 Furnaces 5 Generators 4 Hot Gas Generator 1 Induction Furnace 2 ISA mill 1 Jaw crushers 3
156 Major Equipment Quantity Linear screens 2 Main Fans 2 Main Generator 1 Mill gearboxes 2 Mill motors 2 Mudguns 4 Plc 7 Pressure Vessels 40 Samco Pumps 100 Scrubbers 3 Silos 4 Strapping Band Machine 1 Tanks Stainless 30 Thickeners 28 Transformers 33 Vacuum Pumps 4 Vent & Extraction Fans 7 Vibrating feeders 8 Vibrating screens 2 Weighbridge 2 Wet Gas Fans 2 14.2.1 K3 Mix Concentrator 14.2.1.1 Process Description The K3 Mix concentrator (Figure 59) mainly processes material from the K3, 4B and Rowland Shafts. The K3 Mix concentrator is expected to treat some of the K4 material once production from the K4 Shaft ramps-up. RoM material is milled in the Primary Mill in order to reduce the particle size and liberate the PGMs. The Primary Mill discharge slurry is pumped to the Primary Roughers where some of the PGMs are recovered in the flotation concentrate. The tails from the Primary Roughers are milled in a Secondary Milling step to further liberate the PGMs. The Secondary Mill discharge slurry is pumped to a Secondary Rougher flotation circuit. The tails from the Secondary Rougher are thickened and transferred to the Karee TSF. Concentrates from the Primary and Secondary Roughers are pumped to the Primary Cleaners for further upgrading. The tails from the Primary Cleaners are pumped to the Secondary Cleaners for additional PGM recovery. The Secondary Cleaner tails report to the TSF. 157 The Primary and Secondary Cleaner concentrates are thickened, before being pumped into slurry tankers and transferred to the smelter. Figure 59: A Simplified Block Flow Diagram of K3 Mix Concentrator 14.2.1.2 Plant Capacity The K3 Mix concentrator capacity is shown in Table 50: Table 50: K3 Mix Feed Capacity t/hr t/day t/month Annualized Tonnes K3 Mix 220 4,910 142,402 1,708,810 14.2.1.3 Personnel Requirements The K3 Mix and K3 UG2 concentrators are situated within the same geographical area. They are considered a single entity from a management, reporting and costing perspective. The K3 Mix and K3 UG2 concentrators have a combined work force complement of 97 employees. The concentrator utilises four teams on rotating shifts. Employees consist of processors, responsible for operating the plant, as well as artisans and maintenance staff who maintain all plant equipment. The concentrators are adequately staffed to ensure a safe and efficient operation. 158 14.2.1.4 Production Plan The recent history and budget operational parameters for the K3 Mix concentrator are presented in Table 51, Figure 60 and Figure 61,The C2018, C2019 and C2020 data presented reflect the actual annual performance whilst the C2021 to C2040 data represents current budget targets. The current operational methods and capacities are adequate. Metallurgical efficiencies projected have also been sustainably obtained historically and are thus reasonable budget targets. Table 51: K3 Mix Concentrator Production Forecast and Operational Data Parameter Actual Budget C2019 C2020 C2021 C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 Total Feed (kt) 1,504 1,451 1,726 1,759 1,766 1,771 1,791 1,747 1,720 1,509 1,585 Head Grade (g/t) 3.07 3.24 3.42 3.42 3.50 3.67 3.86 3.84 3.91 3.98 4.07 Concentrate Produced (kt) 34 37 38 39 39 39 39 38 38 33 35 4E Recovery (%) 89% 89% 88% 88% 88% 88% 88% 88% 88% 88% 88% 4E Metal Produced (kt) 133 135 167 170 175 184 196 190 190 170 183 Parameter Budget C2030 C2031 C2032 C2033 C2034 C2035 C2036 C2037 C2038 C2039 C2040 Total Feed (kt) 1,640 1,555 1,535 1,534 1,538 1,500 1,432 1,319 1,261 1,276 1,224 Head Grade (g/t) 4.22 4.33 4.20 4.23 4.23 4.22 4.32 4.31 4.20 4.06 3.94 Concentrate Produced (kt) 36 34 34 34 34 33 32 29 28 28 27 4E Recovery (%) 88% 88% 88% 88% 88% 88% 88% 88% 88% 88% 88% 4E Metal Produced (kt) 196 190 183 183 184 179 175 161 150 147 137 159 Figure 60: K3 Mix Concentrator Throughput Forecast Figure 61: K3 Mix Concentrator Production and Recovery Forecast
160 14.2.1.5 Energy Requirements The K3 concentrator receives electricity from the 33kV Karee substation. The power supply is sufficient for the processing circuit and this includes milling, screening and floatation. 14.2.1.6 Water Requirements The K3 concentrator has a water positive balance. The K3 concentrator water balance consists of tailings return water, Buffelspoort water, water from UG2 pits, as well as the use of Rand Water Board for potable water and reagents. 14.2.2 K3 UG2 Concentrator 14.2.2.1 Process Description The K3 UG2 concentrator (Figure 62) mainly processes material from the K3 Shaft. RoM material is milled in the Primary Mill in order to reduce the particle size and liberate the PGMs. The Primary Mill discharge slurry is pumped to the Primary Roughers where some of the PGMs are recovered in the flotation concentrate. The tails from the Primary Roughers is milled in a Secondary Milling step to further liberate the PGMs. The Secondary Mill discharge slurry is pumped to a Secondary Rougher flotation circuit. The tails from the Secondary Rougher is thickened and transferred to a Chrome Recovery plant, which is operated by an independent company. The Chrome Recovery plant utilises a spiral gravity concentration circuit to produce a chrome concentrate. The remaining tailings is transferred to the Karee TSF. Concentrate from the Primary and Secondary Roughers are pumped to the Primary Cleaners for further upgrading. The tails from the Primary Cleaners is pumped to the Secondary Cleaners for additional PGM recovery. The Secondary Cleaner tails reports to the TSF. The Primary and Secondary Cleaner concentrate is thickened, before being pumped into slurry tankers and transferred to the smelter. 161 Figure 62: A Simplified Block Flow Diagram of K3 UG2 Concentrator 14.2.2.2 Plant Capacity The K3 UG2 concentrator capacity is shown in Table 52: Table 52: K3 UG2 Feed Capacity t/hr t/day t/month Annualized Tonnes K3 UG2 190 4,2441 122,983 1,475,798 14.2.2.3 Personnel Requirements The K3 Mix and K3 UG2 concentrators are situated within the same geographical area. They are considered a single entity from a management, reporting and costing perspective. The K3 Mix and K3 UG2 concentrators have a combined workforce complement of 97 employees. The concentrator utilises four teams on rotating shifts. Employees consist of processors, responsible for operating the plant, as well as artisans and maintenance staff who maintain all plant equipment. The concentrators are adequately staffed to ensure a safe and efficient operation. 14.2.2.4 Production Plan The recent history and budget operational parameters for the K3 UG2 concentrator are presented in Table 53, Figure 63 and Figure 64. The presented C2019, C2020 and C2021 data reflect the actual annual performance while the 2021 to 2040 data represent current budget targets. The current operational methods and capacities are adequate. The projected metallurgical efficiencies have also been sustainably obtained historically and are thus reasonable budget targets. 162 Table 53: K3 UG2 Concentrator Production Forecast and Operational Data Parameter Actual Budget C2019 C2020 C2021 C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 Total Feed (kt) 1,400 1,155 1,513 1,534 1,506 1,510 1,506 1,506 1,506 1,510 1,506 Head Grade (g/t) 3.63 3.71 3.94 3.86 3.86 3.86 3.90 3.97 4.03 4.21 4.21 Concentrate Produced (kt) 17 17 18 19 19 19 19 19 19 19 19 4E Recovery (%) 87.0% 86.5% 87.0% 87.9% 87.9% 87.9% 87.9% 87.9% 87.9% 87.9% 87.9% 4E Metal Produced (kt) 140 120 159 167 164 164 166 169 172 180 179 Parameter Budget C2030 C2031 C2032 C2033 C2034 C2035 C2036 C2037 C2038 C2039 C2040 Total Feed (kt) 1,506 1,506 1,510 1,506 1,153 1,085 1,095 1,086 1,087 980 1,024 Head Grade (g/t) 4.26 4.29 4.23 4.10 3.97 3.96 3.94 3.96 3.94 3.92 3.91 Concentrate Produced (kt) 19 19 19 19 14 13 14 13 13 12 13 4E Recovery (%) 87.9% 87.9% 87.9% 87.9% 87.9% 87.9% 87.9% 87.9% 87.9% 87.9% 87.9% 4E Metal Produced (kt) 181 183 180 174 129 121 122 122 121 108 113 Figure 63: K3 UG2 Concentrator Throughput Forecast 163 Figure 64: K3 UG2 Concentrator Production and Recovery Forecast 14.2.2.5 Energy Requirements The K3 concentrator receives electricity from the 33kV Karee substation. The power supply is sufficient for the processing circuit and this includes milling, screening and floatation. 14.2.2.6 Water Requirements The K3 concentrator has a water positive balance. The K3 concentrator water balance consists of tailings return water, Buffelspoort water, water from UG2 pits, as well as the use of Rand Water Board for potable water and reagents. 14.2.3 EPL Concentrator 14.2.3.1 Process Description The EPL concentrator (Figure 65) mainly processes material from the Saffy, E3 and Rowland Shafts. The EPL concentrator utilises a number of crushing steps to reduce the ore size to less than 20mm. The crushed product is transferred to the Primary Mill in order to reduce the particle size further and liberate the PGMs. The Primary Mill discharge slurry is pumped to the Primary Roughers where some of the PGMs are recovered in the flotation concentrate. The tails from the Primary Roughers is milled in a Secondary Milling step. The Secondary Mill discharge slurry is pumped to a Secondary Rougher flotation circuit. The tails from the Secondary Rougher is thickened and transferred to a Chrome Recovery plant, which is operated by an independent company.
164 The Chrome Recovery plant utilises a spiral gravity concentration circuit to produce a chrome concentrate. The tailings from this process is pumped to the ETTP concentrator where some of the remaining PGMs are recovered. Concentrate from the Primary and Secondary Roughers are pumped to the Primary Cleaners for further upgrading. The tails from the Primary Cleaners is pumped to a Stirred Media Detrtitor (SMD), which further grinds the tails and allows for additional PGMs to be recovered. The product from the SMD is pumped to the Secondary Cleaner circuit where additional PGMs are recovered. The Secondary Cleaner tails is combined with the Secondary Rougher tails and transferred to the Chrome Recovery plant. The Primary and Secondary Cleaner concentrate are thickened, before being pumped into slurry tankers and transferred to the smelter. Figure 65: A Simplified Block Flow Diagram of EPL Concentrator 14.2.3.2 Plant Capacity The EPL concentrator capacity is shown in Table 54: Table 54: EPL Concentrator Feed Capacity t/hr t/day t/month Annualized Tonnes EPL 180 8035 233,021 2,796,250 14.2.3.3 Personnel Requirements The EPL concentrator has a workforce complement of 117 employees. The concentrator utilises four teams on rotating shifts. Employees consist of processors, responsible for operating the plant, as well as artisans and maintenance staff who maintain all plant equipment. 165 The EPL concentrator is adequately staffed to ensure a safe and efficient operation. 14.2.3.4 Production Plan The recent history and budget operational parameters for the EPL concentrator are presented in Table 55, Figure 66 and Figure 67). The C2019, C20120 and C2021data presented reflects the actual annual performance whilst the C2021 to C2040 data represents current budget targets. The current operational methods and capacities are adequate. Metallurgical efficiencies projected have also been sustainably obtained historically and are thus reasonable budget targets. Table 55: EPL Concentrator Production Forecast and Operational Data Parameter Actual Budget C2019 C2020 C2021 C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 Total Feed (kt) 2,101 2,255 2,209 2,770 2,741 2,838 2,764 2,808 2,738 2,492 2,462 Head Grade (g/t) 4.05 4.06 4.22 4.06 4.13 4.16 4.11 4.08 4.12 4.07 4.04 Concentrate Produced (kt) 22 22 22 30 30 31 30 31 30 27 27 4E Recovery (%) 80.8% 81.7% 79.9% 80.5% 80.5% 80.5% 80.5% 80.5% 80.5% 80.5% 80.5% 4E Metal Produced (kt) 222 240 239 291 293 305 294 297 292 262 258 Parameter Budget C2030 C2031 C2032 C2033 C2034 C2035 C2036 C2037 C2038 C2039 C2040 Total Feed (kt) 2,291 2,098 1,840 1,498 1,330 1,208 1,265 976 833 809 742 Head Grade (g/t) 4.02 3.95 3.94 4.00 4.05 3.95 3.99 4.01 4.09 4.05 4.08 Concentrate Produced (kt) 25 23 20 16 14 13 14 11 9 9 8 4E Recovery (%) 80.5% 80.5% 80.5% 80.5% 80.5% 80.5% 80.5% 80.5% 80.5% 80.5% 80.5% 4E Metal Produced (kt) 238 214 188 155 155 139 123 131 101 88 85 166 Figure 66: EPL Concentrator Throughput Forecast Figure 67: EPL Concentrator Production and Recovery Forecast 167 14.2.3.5 Energy Requirements The EPL concentrator has a ring feed supply from the 11kV Eastern Central substation. The power supply is sufficient for the processing circuit and this includes milling, crushing, screening and floatation. 14.2.3.6 Water Requirements The EPL concentrator has a water positive balance. The EPL concentrator water balance consists of tailings return water, borehole water, return water from the nearby shafts (Saffy/ E3) and Hartbeespoort canal water, as well as the use of Rand Water Board for potable water and reagents. 14.2.4 K4 Concentrator 14.2.4.1 Process Description The K4 concentrator (Figure 68) typically receives material from the Rowland, 4B and Saffy Shafts. The K4 concentrator will process material from the K4 shaft once the shaft is in operation. RoM material is milled in the Primary Mill in order to reduce the particle size and liberate the PGMs. The Primary Mill discharge slurry is pumped to the Primary Roughers where some of the PGMs are recovered in the flotation concentrate. The tails from the Primary Roughers is milled in a Secondary Milling step. The Secondary Mill discharge slurry is pumped to a Secondary Rougher flotation circuit. The tails from the Secondary Rougher is thickened and transferred to the Karee TSF. Concentrate from the Primary and Secondary Roughers are pumped to the Primary Cleaners for further upgrading. The tails from the Primary Cleaners is pumped to the Secondary Cleaners for additional PGM recovery. The Secondary Cleaner tails reports to the TSF. The Primary and Secondary Cleaner concentrate is thickened, before being pumped into slurry tankers and transferred to the smelter. Figure 68: A Simplified Block Flow Diagram of K4 Concentrator
168 14.2.4.2 Plant Capacity The K4 concentrator capacity is shown in Table 56: Table 56: K4 Concentrator Feed Capacity t/hr t/day t/month Annualized Tonnes K4 155 3,460 100,328 1,203,941 14.2.4.3 Personnel Requirements The K4 concentrator has a workforce complement of 69 employees. The concentrator utilises four teams on rotating shifts. Employees consist of processors, responsible for operating the plant, as well as artisans and other maintenance staff who maintain all plant equipment. The K4 concentrator is adequately staffed to ensure a safe and efficient operation. 14.2.4.4 Production Plan The recent history and budget operational parameters for the K4 concentrator are presented in Table 57, Figure 69 and Figure 70. The C2019, C2020 and C2021 data presented reflects the actual annual performance whilst the 2021 to 2032 data represents current budget targets. K4 UG2 will be treated at the K4 concentrator, once production of the K4 shaft ramps up. Rowland UG2 ore, which was previously processed at K4, will then be processed at EPC. This will necessitate the restart and ramp-up of the EPC concentrator. This also explains the drop in K4 throughput from 2020 to 2022. The current operational methods and capacities are adequate. Metallurgical efficiencies projected have also been sustainably obtained historically and are thus reasonable budget targets. 169 Table 57: K4 Concentrator Production Forecast and Operational Data Parameter Actual Budget C2019 C2020 C2021 C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 Total Feed (kt) 1,114 734 1,310 1,459 1,223 1,315 1,273 1,267 1,312 1,315 1,312 Head Grade (g/t) 3.42 3.51 3.73 3.89 3.80 3.89 4.07 4.21 4.19 4.14 4.14 Concentrate Produced (kt) 21 11 17 21 18 20 19 17 17 17 17 4E Recovery (%) 89.7% 87.0% 87.5% 86.6% 86.6% 86.7% 86.6% 86.5% 86.4% 86.4% 86.4% 4E Metal Produced (kt) 85 72 137 158 129 143 144 148 152 151 151 Parameter Budget C2030 C2031 C2032 C2033 Total Feed (kt) 1,144 930 592 101 Head Grade (g/t) 4.11 4.07 4.04 3.99 Concentrate Produced (kt) 15 12 8 1 4E Recovery (%) 86.4% 86.4% 86.4% 86.4% 4E Metal Produced (kt) 131 105 66 11 Figure 69: K4 Concentrator Throughput Forecast 170 Figure 70: K4 Concentrator Production and Recovery Forecast 14.2.4.5 Energy Requirements The K4 concentrator has a ring feed supply from the 33kV Karee substation. The power supply is sufficient for the processing circuit and this includes milling, screening and floatation. 14.2.4.6 Water Requirements The K4 concentrator has a positive water balance. The K4 concentrator water balance consists of tailings return water, water from the UG2 pits, as well as the use of Rand Water Board for potable water and reagents. 14.2.5 EPC Concentrator 14.2.5.1 Process Description The EPC concentrator (Figure 71) was put on care-and-maintenance in 2020 as part of a process to restructure costs and maximize throughput at the remaining concentrators. It is anticipated that the EPC concentrator will be restarted when additional material from the K4 shaft becomes available. EPC will then treat material from the E3 and Rowland Shafts. RoM material is milled in the Primary Mill in order to reduce the particle size and liberate the PGMs. The Primary Mill discharge slurry is pumped to the Primary Roughers where some of the PGMs are recovered in the flotation concentrate. The tails from the Primary Roughers is milled in a Secondary 171 Milling step to further liberate the PGMs. The Secondary Mill discharge slurry is pumped to a Secondary Rougher flotation circuit. The tails from the Secondary Rougher is thickened and transferred to the Chrome Recovery plant, which is operated by an independent company. The Chrome Recovery plant utilises a spiral gravity concentration circuit to produce a chrome concentrate. The tailings from this process is pumped to the ETTP concentrator where some of the remaining PGMs are recovered. Concentrate from the Primary and Secondary Roughers are pumped to the Primary and Secondary Cleaners for further upgrading. The tails from the Primary Cleaners is pumped to the Secondary Cleaner circuit where additional PGMs are recovered. The Secondary Cleaner tails is pumped to an Isamill, which further grinds the tails and allows additional PGMs to be recovered in the Tertiary Cleaner flotation circuit. The Primary, Secondary and Tertiary Cleaner concentrate are thickened, before being pumped into slurry tankers and transferred to the smelter. Figure 71: A Simplified Block Flow Diagram of EPC Concentrator 14.2.5.2 Plant Capacity The EPC concentrator capacity is shown in Table 58. Table 58: EPC Concentrator Feed Capacity t/hr t/day t/month Annualized Tonnes EPC 150 3,348 97,092 1,165,104
172 14.2.5.3 Personnel Requirements The EPC concentrator was put on care-and-maintenance in 2020 as part of a process to restructure costs and maximize throughput at the remaining concentrators. The plant will be operated for a 3 month period in 2021, during which time it will be staffed by employees from the EPL concentrator and external contractors. (The EPL concentrator is situated in close proximity to the EPC concentrator.) The EPC concentrator will be adequately staffed once K4 Shaft mining ramps-up. 14.2.5.4 Production Plan The recent history and budget operational parameters for the EPC concentrator are presented in Table 59, Figure 72 and Figure 73. The C2019, C2020and C2021 data presented reflects the actual annual performance whilst the C2022 to C2026 data represents current budget targets. Plant modifications and other maintenance activities were performed on EPL concentrator in 2020. The EPC concentrator operated for approximately 3 months to offset the lower throughput at EPL during this period. It is anticipated that the EPC concentrator will be restarted when additional material from the K4 Shaft becomes available. EPC will then treat material from the E3 and Rowland Shafts. Metallurgical efficiencies projected have also been sustainably obtained historically and are thus reasonable budget targets. (The low recovery in 2020 is skewed due to very low production and is not representative of typical plant performance. Table 59: EPC Concentrator Production Forecast and Operational Data Parameter Actual Budget C2019 C2020 C2021 C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 Total Feed (kt) 806 17 301 0 516 905 665 582 Head Grade (g/t) 3.80 2.87 4.10 - 4.00 4.08 4.13 4.24 Concentrate Produced (kt) 9 0.18 4 0 6 11 8 7 4E Recovery (%) 82.5% 70.7% 82.8% 0.0% 83.8% 83.8% 83.8% 83.8% 4E Metal Produced (kt) 82 0.94 33 0 56 99 74 66 173 Figure 72: EPC Concentrator Throughput Forecast Figure 73: EPC Concentrator Production and Recovery Forecast 174 14.2.5.5 Energy Requirements The EPC concentrator has a ring feed supply from the 11kV Eastern Central substation. The power supplied is sufficient for the processing circuit and this includes milling, screening and floatation. 14.2.5.6 Water Requirements EPC concentrator has positive water balance. The EPC concentrator water balance consists of tailings return water, borehole water, water supply from the EPL Concentrator, as well as the use of Rand Water Board for potable water and reagents. 14.2.6 BTT Concentrator 14.2.6.1 Process Description Re-mined tailings are processed in a Chrome Recovery plant where chrome is separated from the PGMs using a spiral gravity concentration circuit (Figure 74). The coarse tail stream from the Chrome Recovery plant is pumped to the BTT concentrator Primary Mill in order to reduce the particle size and liberate the PGMs. The Primary Mill discharge slurry is pumped to the Primary Roughers where some of the PGMs are recovered in the flotation concentrate. The tails from the Primary Roughers is milled in a Secondary Milling step to further liberate the PGMs. The Secondary Mill discharge slurry is pumped to a Secondary Rougher flotation circuit. The tails from the Secondary Rougher is thickened and transferred to the TSF. Concentrate from the Primary and Secondary Roughers are pumped to the Primary and Secondary Cleaners for further upgrading. The tails from the Primary Cleaners is pumped to the Secondary Cleaner circuit where additional PGMs are recovered. The Secondary Cleaner tails is pumped to the TSF. The Primary and Secondary Cleaner concentrate is thickened, before being pumped into slurry tankers and transferred to the smelter. 175 Figure 74: A Simplified Block Flow Diagram of BTT Concentrator 14.2.6.2 Plant Capacity The BTT concentrator capacity is shown in Table 60: Table 60: BTT Concentrator Feed Capacity t/hr t/day t/month Annualized Tonnes BTT 450 10,044 291,276 3,495,312 14.2.6.3 Personnel Requirements The BTT concentrator has a workforce complement of 99 employees. The concentrator utilises four teams on rotating shifts. Employees consist of processors, responsible for operating the plant, as well as artisans and other maintenance staff who maintain all plant equipment. The BTT concentrator is adequately staffed to ensure a safe and efficient operation. 14.2.6.4 Production Plan The recent history and budget operational parameters for the BTT concentrator are presented in Table 61, Figure 75 and Figure 76. The C2019, C2020 and C2021data presented reflects the actual annual performance whilst the C2022 to 2025 data represents current budget targets. The current operational methods and capacities are adequate. Metallurgical efficiencies projected have also been sustainably obtained historically and are thus reasonable budget targets. Table 61: BTT Concentrator Production Forecast and Operational Data Parameter Actual Budget
176 C2019 C2020 C2021 C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 Total Feed (kt) 3,600 3,447 3,869 3,728 3,681 3,655 2,506 Head Grade (g/t) 0.90 0.89 0.87 0.88 0.90 0.93 0.94 Concentrate Produced (kt) 11.2 11.0 12 .1 12.3 12.1 12.0 8.2 4E Recovery (%) 24.6% 25.7% 26.2% 25.6% 25.6% 25.6% 25.6% 4E Metal Produced (kt) 32 24 31 27 27 28 19 Figure 75: BTT Concentrator Throughput Forecast 177 Figure 76: BTT Concentrator Production and Recovery Forecast 14.2.6.5 Energy Requirements The BTT concentrator has a ring feed to the main plant from the 6.6kV Middelkraal substation. The power supplied is sufficient for the processing circuit and this includes milling, screening and floatation. 14.2.6.6 Water Requirements BTT concentrator has a positive water balance. The BTT concentrator water balance consists of tailings return water, water from the Pandora infrastructure, as well as the use of Rand Water Board for potable water and reagents. 14.2.7 ETTP Concentrator 14.2.7.1 Process Description The ETTP concentrator ( Figure 77) receives feed material from the Chrome Recovery plant. The coarse fraction in the feed is pumped to a Primary Mill in order to reduce the particle size and liberate the PGMs. The coarse fraction from the Primary Mill discharge is pumped to the Isamill for further grinding and liberation of PGMs. The Isamill slurry is pumped to the Primary Roughers where some of the PGMs 178 are recovered in the flotation concentrate. The tails from the Primary Roughers is thickened and transferred to the TSF. The Primary Rougher Concentrate is pumped to the Primary Cleaners for further upgrading of the PGM concentrate. The tails from the Primary Cleaners is pumped to the TSF. The Primary Cleaner concentrate is pumped to the Final Cleaners and the concentrate from the Final Cleaners is thickened, before being pumped into slurry tankers and transferred to the smelter. Figure 77: A Simplified Block Flow Diagram of ETTP Concentrator 14.2.7.2 Plant Capacity The ETTP concentrator capacity is shown in Table 62: Table 62: ETTP Concentrator Feed Capacity t/hr t/day t/month Annualized Tonnes ETTP 323 7,218 209,330 2,511,964 14.2.7.3 Personnel Requirements The ETTP concentrator has a workforce complement of 29 employees. The concentrator utilises four teams on rotating shifts. Employees consist of processors, responsible for operating the plant, as well as artisans and other maintenance staff who maintain all plant equipment. The ETTP concentrator is adequately staffed to ensure a safe and efficient operation. 179 14.2.7.4 Production Plan The recent history and budget operational parameters for the ETTP concentrator are presented in Table 63, Figure 78 and Figure 70. The C2019, C2020 and C2021 data presented reflects the actual annual performance whilst the 2021 to 2040 data represents current budget targets. The current operational methods and capacities are adequate. The budgeted throughput is above the stated plant capacity, but historical data suggest that higher than nameplate capacity has been achieved and can be sustained in future. Metallurgical efficiencies projected have also been sustainably obtained historically and are thus reasonable budget targets. Table 63: ETTP Concentrator Production Forecast and Operational Data Parameter Actual Budget C2019 C2020 C2021 C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 Total Feed (kt) 2,132 2,273 2,484 2,740 3,221 3,702 3,391 3,352 2,708 2,464 2,435 Head Grade (g/t) 0.76 0.75 0.84 0.80 0.79 0.78 0.79 0.79 0.81 0.80 0.80 Concentrate Produced (kt) 3.9 4.9 5.2 5.2 5.2 6.0 5.5 5.5 4.4 4.0 4.0 4E Recovery (%) 25.0% 30.7% 28.8% 26.8% 26.8% 26.8% 26.8% 26.8% 26.8% 26.8% 26.8% 4E Metal Produced (kt) 17 16 19 19 22 25 23 23 19 17 17 Parameter Budget C20C2 030 C20C2 031 C20C2 032 C20C2 033 C20C2 034 C20C2 035 C20C2 036 C20C2 037 C20C2 038 C20C2 039 C20C2 040 Total Feed (kt) 2,266 2,075 1,819 1,481 1,316 1,195 1,251 965 823 800 734 Head Grade (g/t) 0.79 0.78 0.78 0.79 0.80 0.78 0.79 0.79 0.81 0.80 0.81 Concentrate Produced (kt) 3.7 3.4 3.0 2.4 2.1 1.9 2.0 1.6 1.3 1.3 1.2 4E Recovery (%) 26.8% 26.8% 26.8% 26.8% 26.8% 26.8% 26.8% 26.8% 26.8% 26.8% 26.8% 4E Metal Produced (kt) 15 14 12 10 9 8 8 6 6 5 5
180 Figure 78: ETTP Concentrator Throughput Forecast Figure 79: ETTP Concentrator Production and Recovery 181 14.2.7.5 Energy Requirements The ETTP concentrator has a ring feed/ parallel supply from the 11kV Eastern Central substation. The power supply is sufficient for the processing circuit and this includes milling, screening and floatation. 14.2.7.6 Water Requirements The ETTP concentrator has a positive water balance. The concentrator water supply consists of tailings return water, borehole water, water supplied from EPL Concentrator, as well as the use of Rand Water Board for potable water and reagents. 14.3 Smelting and Refining 14.3.1 Smelter 14.3.1.1 Process Description The smelter also receives and treats concentrate from Third-Parties as either slurry of filter cake. The concentrate and recycled material are blended in several blending tanks to stabilize and homogenize the feed to the furnaces. The concentrate slurry is filtered and dried in a flash dryer to a moisture content of approximately 0.5%. The Smelter has five furnaces. The two larger furnaces (Furnace 1 and 2) are usually in operation, with the three smaller Pyromet furnaces being utilised as back-up or spare capacity. All furnaces are of round design with three electrodes operating on alternating current. The furnaces use electrical energy to melt the concentrate into two molten phases: a less dense slag phase which contains gangue metals and a denser matte phase which contains PGMs and Base Metals. Furnace matte and slag are tapped from the furnaces at regular intervals. Furnace slag is granulated in water and sent to the slag recovery circuit, while furnace matte is tapped in ladles and poured into the Pierce-Smith converters. The Pierce-Smith converters oxidize FeS to FeO, which reports to the slag phase. The slag is granulated in water and transferred to the slag recovery plant to recover any entrained PGMs. The converter matte is granulated and transferred to the Base Metal Refinery Off-gasses from the smelter contain SO2 that needs to be fixated due to safety, health and environmental reasons. Fixation is done with lime to produce a CaSOx waste product. The slag recovery plant utilises a milling and flotation circuit to recover entrained PGMs from the slag. The slag plant concentrate is recycled to the furnaces. The tails from the slag plant is transferred to the TSF. 182 Figure 80: A Simplified Block Flow Diagram of the Smelter 14.3.1.1 Plant Capacity The Smelter capacity is shown in Table 64: Table 64: Smelter Feed Capacity t/hr t/day t/month Annualized Tonnes Smelter (Concentrate 21 493 15,000 180,000 14.3.1.2 Personnel Requirements The Smelter has a workforce complement of 334 employees. The Smelter utilises four teams on rotating shifts. Employees consist of processors, responsible for operating the plant, as well as artisans and other maintenance staff who maintain all plant equipment. The Smelter is adequately staffed to ensure a safe and efficient operation. 14.3.1.3 Production Plan The recent history and budget operational parameters for the Smelter are presented in Table 65, Figure 81 and Figure 82. The C2019, C2020 and C2021 data presented reflects the actual annual performance whilst the 2022 to 2041 data represents current budget targets. The Smelter recoveries from 2019 – 2020 were in excess of 100%. The Smelter embarked on a clean-up process during that period, which resulted in the recovery of metals which were previously written-off. The current operational methods and capacities are adequate. Metallurgical efficiencies projected are reasonable budget targets. 183 Table 65: Smelter Production Forecast and Operational Data Parameter Actual Budget C2019 C2020 C2021 C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 C2030 Total Feed (kt) 159 127 155 141 161 159 130 118 108 100 102 99 Converter Matte Produced (kt) 6.97 5.98 7.86 5.31 5.61 5.84 5.32 4.53 4.18 3.78 3.89 3.90 4E Recovery (%) 102% 102% 100% 99% 99% 99% 99% 99% 99% 99% 99% 99% 4E Metal Produced (kozt) 1004 755 1039 874 947 1003 922 884 817 773 779 755 Parameter Budget C2031 C2032 C2033 C2034 C2035 C2036 C2037 C2038 C2039 C2040 C2041 Total Feed (kt) 91 83 73 65 62 61 55 52 50 49 50 Converter Matte Produced (kt) 3.65 3.46 3.25 3.08 2.97 2.87 2.63 2.51 2.50 2.42 2.61 4E Recovery (%) 99% 99% 99% 99% 99% 99% 99% 99% 99% 99% 99% 4E Metal Produced (kozt) 699 623 529 457 428 432 387 361 342 330 331 Figure 81: Smelter Throughput Forecast
184 Figure 82: Smelter PGM Production and Recovery Forecast 14.3.1.4 Energy Requirements The Smelter receives electricity from the Wonderkop MV Substation, which has 4 x 20MVA, 11kV Transformers. 14.3.1.5 Water Requirements The Smelter recovers water from the concentrate slurry (water is filtered during the drying process and used as process water), as well as water from the Rowland Shaft and storm water dams. 14.3.2 Base Metal Refinery (BMR) 14.3.2.1 Process Description The Base Metal Refinery (BMR) (Figure 83) receives granulated converter matte from the smelter. The matte is milled in a ball mill. A number of leaching processes are used to separate the base metals from the PGMs. Nickel is leached in the first stage leach with sulphuric acid and oxygen. The leach solution from the first stage leach is pumped to the crystallizer plant where the nickel is recovered as nickel sulphate hexahydrate crystals. 185 The residue from the first stage leach is treated in a two stage pressure leach (the second and third stage leaches) to remove the remainder of the nickel and copper from the PGM fraction. The PGM residue from the third stage leach is upgraded in a number of batch processes to remove minor elements. The final leach residue is vacuum dried, sampled and dispatched to the Precious Metals Refinery. Selenium and tellurium are removed from the copper rich pressure leach solution. The copper solution is pumped to the copper electrowinning plant where copper is produced as copper cathodes. Figure 83: A Simplified Block Flow Diagram of the Base Metal Refinery 14.3.2.2 Plant Capacity The BMR capacity is shown in Table 66: Table 66: BMR Feed Capacity t/hr t/day t/month Annualized Tonnes BMR (Converter Matte 2 40 1,217 14,600 14.3.2.3 Production Plan The recent history and budget operational parameters for the BMR are presented in Table 67, Figure 84 and Figure 85. The C2019, C2020 and C2021 data presented reflects the actual annual performance whilst the 2021 to 2040 data represents current budget targets. The current operational methods and capacities are adequate. Metallurgical efficiencies projected are reasonable budget targets. 186 Table 67: Base Metals Refinery Production Forecast and Operational Data Parameter Actual Budget C2019 C2020 C2021 C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 C2030 Total Converter Matte Feed (kt) 6.74 5.84 7.50 5.31 5.61 5.84 5.32 4.53 4.18 3.78 3.89 3.90 Ni Produced (kt) 3.15 2.90 3.28 2.53 2.65 2.75 2.51 2.15 1.99 1.81 1.86 1.86 Cu Produced (kt) 1.94 1.82 2.05 1.54 1.64 1.73 1.57 1.32 1.21 1.09 1.13 1.13 4E Recovery (%) 98% 100% 98% 99% 99% 99% 99% 99% 99% 99% 99% 99% 4E Metal Produced (kozt) 954 774 948 865 937 994 913 876 809 765 772 747 Parameter Budget C2031 C2032 C2033 C2034 C2035 C2036 C2037 C2038 C2039 C2040 C2041 Total Converter Matte Feed (kt) 3.65 3.46 3.25 3.08 2.97 2.87 2.63 2.51 2.50 2.42 2.61 Ni Produced (kt) 1.74 1.64 1.53 1.44 1.38 1.34 1.23 1.17 1.16 1.13 1.21 Cu Produced (kt) 1.06 1.01 0.96 0.92 0.89 0.86 0.79 0.75 0.75 0.72 0.79 4E Recovery (%) 99% 99% 99% 99% 99% 99% 99% 99% 99% 99% 99% 4E Metal Produced (kozt) 693 617 524 453 424 428 383 358 339 327 327 Figure 84: BMR Throughput Forecast 187 Figure 85: BMR PGM & Base Metal Production and Recovery Forecast 14.3.2.4 Personnel Requirements The BMR has a work force complement of 157 employees. The BMR utilises four teams on rotating shifts. Employees consist of processors, responsible for operating the plant, as well as artisans and other maintenance staff who maintain all plant equipment. The BMR is adequately staffed to ensure a safe and efficient operation. 14.3.2.5 Energy Requirements The BMR receives electricity from the Wonderkop MV Substation, which has 4 x 20MVA, 11kV Transformers. 14.3.2.6 Water Requirements The BMR utilises water recovered during the nickel sulphate crystallization process. Water from Rand Water Board is used in the boilers.
188 14.3.3 Precious Metal Refinery (PMR) 14.3.3.1 Process Description The Precious Metals Refinery (PMR)(Figure 86) receives a PGM concentrate from the Base Metal Refinery (BMR). Hydrochloric acid and chlorine gas is used to dissolve all the PGMs. The PGMs are initially recovered as crude intermediate products and then further refined into pure saleable metals. Figure 86: A Simplified Block Flow Diagram of the Precious Metals Refinery 14.3.3.2 Plant Capacity The PMR capacity is shown in Table 68: Table 68: PMR Feed Capacity oz/month Annualized Tonnes PMR (PGM Ounces) 157,917 1,895,000 189 14.3.3.3 Personnel Requirements The PMR has a workforce complement of 213 employees. The PMR utilises two teams on two rotating shifts. The PMR is only in operation for five days a week and for 16 hours a day. Employees consist of processors, responsible for operating the plant, as well as artisans and other maintenance staff who maintain all plant equipment. The PMR is adequately staffed to ensure a safe and efficient operation. 14.3.3.4 Production Plan The recent history and budget operational parameters for the PMR are presented in Table 69, Figure 87 and Figure 88. The C2019, C2020 and C2021 data presented reflects the actual annual performance whilst the 2021 to 2040 data represents current budget targets. The current operational methods and capacities are adequate. Metallurgical efficiencies projected are reasonable budget targets. Table 69: Precious Metals Refinery Production Forecast and Operational Data Parameter Actual Budget C2019 C2020 C2021 C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 C2030 4E Recovery (%) 99% 100% 100% 99% 99% 99% 99% 99% 99% 99% 99% 99% 4E Metal Produced (koz) 950 758 930 856 927 983 903 866 800 756 763 739 Parameter Budget C2031 C2032 C2033 C2034 C2035 C2036 C2037 C2038 C2039 C2040 C2041 4E Recovery (%) 99% 99% 99% 99% 99% 99% 99% 99% 99% 99% 99% 4E Metal Produced (koz) 685 610 518 448 419 423 379 354 335 323 324 190 Figure 87: PMR Throughput Forecast Figure 88: PMR PGM Production and Recovery Forecast 191 14.3.3.5 Energy Requirements The PMR is fed from an onsite 11kV substation, which is supplied on a ring feed from the Van Eck substation in Brakpan. 14.3.3.6 Water Requirements The PMR receives water from the Ekurhuleni municipality as well as return water from the storm water dams. 14.4 Sampling, Analysis, Metal Accounting and Security Generally, adequate attention is given to sampling and sample preparation. While there are accounting anomalies that require further investigation, good accounting procedures are largely in place. Sibanye-Stillwater’s Marikana Operations use the Manufacturing Execution System (MES) for the management of metal accounting data. The goal of the MES system is to create data files from data obtained from various plant sources in such a way as to prevent systematic and spurious errors. Production (e.g. mass measurement) and laboratory data (e.g. analyses) are integrated into a single user interface to facilitate Metal Accounting. 14.4.1 Concentrator Sampling and Metal Accounting All the concentrators use a similar approach in terms of mass measurements, sampling and analysis of samples. The feed and concentrate mass measurements (Table 70) are used as primary metal accounting inputs. Table 70: Primary Mass Measurements - Concentrators Sample stream Instrument type Ore feed Weightometers Concentrate Weighbridge The primary metal accounting points for analytical analyses are summarized in Table 71: Table 71: Primary Metal Accounting (Analytical Measurements) - Concentrators Sample stream Location of sampling points Type of sampler Flotation concentrate and Tails (Slurry) Sampled at source Cross-cut samplers, Rotary samplers & Vezin samplers
192 All analyses are conducted at the Marikana Assay Laboratory using accredited methods. Analytical procedures are validated using certified reference materials (CRMs) of similar composition to the sample. Analytical results are reported on LIMS and MES. A list of analytical methods are shown Table 72. Table 72: Analytical Methods - Concentrators 14.4.2 Smelter - Sampling and Metal Accounting The instruments and equipment used at the smelter for metal accounting mass measurements are summarized in Table 73. Table 73: Primary Mass Measurements - Smelter The weighbridge and platform scales are calibrated bi-annually. The primary metal accounting sample points and samplers are summarized in Table 74: Table 74: Primary Metal Accounting Streams - Smelter Sample stream Location of sampling points Type of sampler Flotation concentrate (Slurry) Sampled at source Vezin sampler Flotation concentrate (filter cake) Sampled at source Auger sampler Returns material (High grade) Sampled at source Rotary splitter / divider Returns material (Low grade) Sampled at source Rotary splitter / divider Slag plant tailings Smelter Vezin sampler Converter matte Smelter Belt –end cross cut sampler Sample stream Element of Analysis Method of Analysis Flotation concentrate PGMs + Au Nickel sulphide Cu, Ni, Cr2O3 Na2O2 fusion followed by ICP Tails PGMs + Au Fire assay Cu, Ni, Cr2O3 Na2O2 fusion followed by ICP Sample stream Instrument type Flotation concentrate BMR/Smelter weighbridge Converter matte to BMR Platform scale 193 All analyses are conducted at the Marikana Assay Laboratory using accredited methods. Analytical procedures (Table 75) are validated using CRMs of similar composition to the sample. Analytical results are reported on LIMS and MES. For Laboratory accreditation see Section 8.4.1. A list of analytical methods are shown in the table below. Table 75: Analytical Methods - Smelter Sample stream Element of Analysis Method of Analysis Flotation concentrate PGMs + Au Nickel sulphide Cu, Ni, Cr2O3 Na2O2 fusion followed by ICP Third party material (e.g PGMs Alloy) PGMs + Au Nickel sulphide Cu, Ni, Cr2O3 Na2O2 fusion followed by ICP Returns material (High grade) PGMs + Au Nickel sulphide Returns material (Low grade) PGMs + Au Nickel sulphide Slag plant tailings PGMs + Au Fire Assay (daily) & Nickel sulphide (Weekly composite) Cu, Ni, Cr2O3 Na2O2 fusion followed by ICP Converter matte PGMs +Au Nickel sulphide Cu, Ni Na2O2 fusion followed by ICP 14.4.3 Base Metal Refinery – Sampling and Metal Accounting The instruments and equipment used at the BMR for metal accounting mass measurements are summarized in Table 76. Table 76: Primary Mass Measurements - BMR Sample stream Instrument type Converter matte to BMR Platform scale Nickel sulphate crystals platform scale Platform scale Copper cathodes platform scales Platform scale PGM Concentrate Receiving Platform Scale Toll Products BMR/Smelter weighbridge Commercial products Nickel and Copper Platform scale/Smelter Weighbridge The weighbridge and platform scales are calibrated bi-annually. 194 The primary metal accounting sample points and samplers are summarized in Table 77: Table 77: Primary Metal Accounting Streams _BMR Sample stream Location of sampling points Type of sampler Converter matte Smelter Belt –end cross cut sampler Nickel sulphate crystals BMR Crystalliser section Grab Sample Copper cathodes BMR Electrowinning Mechanical Punching machine PGM Concentrate PMR MHD Rotary Splitter All analysis are conducted at the Marikana Assay Laboratory using accredited methods. Analytical procedures are validated using CRMs of similar composition to the sample. Analytical results are reported on LIMS and MES. A list of analytical methods is shown in the Table 78 below. Table 78: Analytical Methods - BMR Sample stream Major Element of Analysis Current Method of Analysis Converter matte PGMs +Au Nickel sulphide Cu, Ni Na2O2 fusion followed by ICP Nickel sulphate crystals Ni Acid dissolution then ICP Copper cathodes Cu Melt Cu into disc, Spark Analysis for trace elements PGM Concentrate PGMs + Au Na2O2 Fusion then ICP 14.4.4 Precious Metal Refinery – Sampling and Metal Accounting The instruments and equipment used at the PMR for metal accounting mass measurements are summarized in Table 79. Table 79: Primary Mass Measurements - PMR Sample stream Instrument type Refinery Feed Platform Scale Toll material Platform scale Residue Scale Platform Scale Final Product Platform scale Final Effluent Weighbridge The weighbridge and platform scales are calibrated bi-annually. The primary metal accounting sample points and samplers are summarized in Table 80. 195 Table 80: Primary Metal Accounting Streams - PMR Sample stream Location of sampling points Type of Sampler Refinery Feed PMR Rotary Splitter Finished Metals PMR Ingot drillings/ Grab sampling of sponge Residues PMR Rotary Splitter Final Effluents PMR Honey cutter All analyses are conducted at the PMR Assay Laboratory using accredited methods. Analytical procedures are validated using certified reference materials (CRMs) of similar composition to the sample. Analytical results are reported on LIMS and MES. A list of analytical methods are shown Table 81. Table 81: Analytical Methods - PMR Sample stream Element of Analysis Current Method of Analysis Refinery Feed PGMs + Au Dissolution using Na2O2 followed by ICP Finished Metals Trace Impurities SAFT Analyser Residues PGMs + Au Dissolution using Na2O2 followed by ICP Final Effluents PGMs + Au ICP 14.5 QP Opinion on Processing The QP is satisfied that the Mineral Processing is appropriate and sufficient to support the LoM and that all material issues have been addressed in this document. 15 Infrastructure 15.1 Overview of Infrastructure Engineering infrastructure at the Marikana Operations includes a wide range of operating technologies, which vary in age and extent of mechanization. Underground operations comprise access infrastructure to convey personnel, materials and equipment to and from the working areas and associated services to support mining operations. Horizontal infrastructure includes crosscuts, return airway drives, footwall haulage levels and declines/inclines. The infrastructure required for ore flow and services include ore- and waste passes, conveyor belts, rail conveyances, ore bins, loading stations, water dams, pump stations, secondary ventilation and workshops. Electrical, compressed air and water reticulation is also part of the underground infrastructure.
196 Surface infrastructure includes headgears and winding systems, primary ventilation, process facilities, office blocks and training centres, workshops and stores, lamp rooms, change houses and accommodation. Dumps/leach pads infrastructure components are not a requirement for underground operations. Figure 89 depicts the major infrastructure situated at the Operation. There are also a number of services and supply centres. These include compressed air supply stations and workshops for small repairs to plant and equipment, surface fridge plant and pumping stations. Infrastructure can also be seen in Figure 96, Figure 97 and Figure 98. Notwithstanding the age of the general infrastructure, all surface and underground infrastructure are reasonably maintained and equipped. In conjunction with the planned maintenance programs, including specific remedial action, the current infrastructure and pumping, hoisting and logistic capacities are considered adequate to satisfy the requirements of the LoM plan. Further, the power generation and distribution systems, water sourcing and reticulation systems are appropriate as envisaged in the LoM plan. See section 13.2, for details on shaft infrastructure. Figure 89: Locations of Major Surface Infrastructure at Marikana 198 15.2 Tailings Storage Facilities The Marikana Operations has three Tailings Storage Facility (TSFs) complexes (Table 82); namely: • Karee TSF complex with four tailings dams; three active (KTD2, KTD3 & KTD4) and one dormant (KTD1). • Western Plats TSF complex with five tailings dams; one active (WTD6) and four dormant (WTD1, WTD2, WTD5 & WTD7). • Eastern Plats TSF complex with two tailings dams; one active (ETD2) and one dormant which is currently being re-mined for PGM & Chrome processing. Table 82: Summary for Active Tailings Dams Tailings Dam Commissioned Expected end of life Comment KTD2 2001 2025 Tailings to be diverted to other facilities from 2026. KTD3 2002 2024 . Tailings to be diverted to other facilities from 2025. KTD4 2008 2044 Requires new TSF from 2045, part of SA PGM integrated TSF strategy WTD6 2000 2030 WTD6 has life of up to 2030; the dam is planned to be used for deposition of Eastern tailings from 2026 when BTT plant stops to end of dam life in 2030 ETD2 2002 2030 Eastern tailings to be re-routed to WTD6 from 2030 to 2036, Macano Pit TSF Planned Studies for environmental permitting ongoing ETD2 dam on the Eastern complex has had historic seepage concerns. An under-drained buttress was completed November 2021 to address the concerns and improve stability. The seepage problem has been resolved. Table 83 provides details of LoM TSF capacity requirements of Marikana Operations. The deposition requirements for the LoM plan totals 187Mt compared to the available capacity of 121Mt, a short fall of 66Mt. The capacities are based on the analysis reports from the Engineers on records, which have been reviewed by a third-party consultant. A comprehensive analysis for the optimisation of deposition of tailings for the Marikana Operations has been done and results indicate the need for a new TSF from as early as 2025. The shortfall will be catered for by utilising the Hoedspruit TSF and the planned Marikana Pit TSF. The design capacity of the Marikana Pit TSF is 138Mt with a life of 32 years. The first two pits (Voids 4 and 5) are to be commissioned Q1 2024 followed by the remaining pits and above ground TSF. The total capital is estimated at R1.8B. Specialist studies for permitting of the Marikana Pit TSF are ongoing. 199 Table 83: LoM Assessment of Tailings Facilities Tailings Facility LoM Deposition (Mt) Available Capacity (Mt) Surplus / (Shortfall) (%) Capital Requirement (ZARm) Karee TSF Complex 125 60 (65) 200 (52.0%) Western Plats TSF Complex 12 36 24 200% Eastern Plats TSF Complex 50 25 (25) (50.0%) 250 Marikana Mine Total 187 121 (66) (35.3%) 15.3 Power Supply Power supply at Marikana (Figure 90) is obtained from the Eskom grid via a 132kV transmission network to Eskom Bighorn substation. At Bighorn substation the 132kV is reduced to 88kV. Six Points of Distribution (POD) are fed from the 88kV network to the Marikana Eskom distribution substations. The internal reticulation at Marikana network is split between 88kV, 33kV,11kV and 6.6kV .Marikana has a combined Notified Maximum Demand (NMD) of 312.5MVA a combined demand charge of 205.05 MVA and consumes an average of 160 to 180 MW. All vertical shafts at Marikana has emergency generators installed to enable the evacuation of people from underground during ESKOM power failures. (W1,Rowland shaft, Karee 4 shaft, Karee 3 shaft and Saffy shaft) Various projects are also in place aimed at reducing the power consumption from the grid. These projects are aimed at air and water consumption reductions. Figure 90: Schematic Layout of Six Power Points of Supply and Surface Infrastructure Power Points and Supply Infrastructure
200 Power Points and Supply Infrastructure 201 Power Points and Supply Infrastructure 15.4 Bulk Water, Fissure Water and Pumping See Section 17.5.6 for information on Bulk Water, Fissure Water and Pumping. No pipeline infrastructure components are material to the Marikana operations. 15.5 Roads and Transport Infrastructure The road network on the Marikana Operations site consists of paved and unpaved roads which are primarily used for the transport of personnel and for access to the offices, shafts, plants and infrastructure positioned around the mine site. Rail and port infrastructure are not required as the product is transported by road to the local smelter and refineries and by road or commercial airlines to the end consumer. 15.6 Equipment Maintenance 15.6.1 Surface Workshops Surface workshops for major repairs were converted to off-site repair facilities operated by third party suppliers or vendors in the neighbouring towns. Only minor repairs are done on the shaft site. 15.6.2 Underground Workshops Underground workshops are used for routine maintenance of equipment. All areas are well equipped. Facility configuration depends on the equipment that is being service to ensure compliance as per 202 the requirements of the planned maintenance schedules. Areas well ventilated and illuminated, floor areas are concreted. 15.7 Offices, Housing, Training Facilities, Health Services Etc. Marikana Operations has central offices for shared services and offices for mine services. Mine Personnel live in the surrounding cities and townships. Support services for Personnel are either provided at the central offices or in the surrounding cities and townships. 15.8 QP Opinion on Infrastructure The QP is satisfied that the Infrastructure is appropriate and sufficient to support the LoM and that all material issues have been addressed in this document. No other infrastructure components are material to the Marikana operations. 16 Market Studies 16.1 Concentrates and Refined Products The Marikana metallurgical complex comprises a smelter, base metal refinery and precious metal refinery (Section 14.3.2 and Section 14.3.3). The base metals refinery produces nickel sulphate hexahydrate crystals and cathode copper. The precious metals refinery produces pure metal, Platinum, Palladium, Rhodium, Ruthenium and Iridium. It also produces gold which is further refined by Rand Refinery. Marikana Operations also produces a chromium oxide (Cr2O3) concentrate. 16.2 Metals Marketing Agreements The smelting and refining facilities at Marikana Operations process all PGM concentrates from the Marikana concentrators, as well as from certain 3rd party suppliers. Refined metals are produced and sold into the market. Approximately 55% of 6E production from Marikana Operations is contractually committed to 5 global customers on short-term contracts 1-2 years in duration. The remainder of the production is sold into the market on a spot basis to a network of customers around the world. Contract volumes and prices are agreed with each customer and will depend on various market and customer conditions at the time. No customers are affiliates of Sibanye-Stillwater. 16.3 Markets 16.3.1 Introduction Information on PGM, including gold, markets is widely available in the public domain. Major refiner and manufacturer of products using PGM, Johnson Matthey regularly publishes market reports. In addition, Sibanye-Stillwater has commissioned an independent PGM market study by its research company, SFA Analytics (SFA(Oxford). This information along with negotiated contracts informs 203 Sibanye-Stillwater’s price and sales predictions. Below is an extract on Supply and demand from the SFA Oxford market study, March 2022. The usefulness of PGMs is determined by their particular chemical and physical properties. Certain of these properties are shared by other materials, but it is the unique combination of properties that makes the PGMs so valuable in their end-markets. The PGMs have high and specific catalytic activity, high thermal resistance, are chemically inert, biocompatible and are hard but malleable for forming into shapes. All the PGMs are constantly subject to risks of substitution from cheaper alternatives, but in most applications their unique properties render them relatively secure. The high cost of PGMs inevitably drives efforts to use lower quantities through thrifting, thereby reducing the loadings in applications. 16.3.2 Demand Summary The main uses of platinum are as a catalyst for automotive emissions control, in a wide range of jewellery pieces and in industrial catalytic and fabrication applications. Palladium is primarily used as a catalyst in the automotive sector, mainly in gasoline-powered on-road vehicles, but alongside platinum in parts of the light-duty diesel engine after-treatment too. The second main use of palladium is in electrical components, specifically in multi-layer ceramic capacitors (MLCCs), as conductive pastes and in electrical plating. Rhodium is used almost solely in the automotive sector, with a small amount used in the glass, chemical and electrical industries. Figure 84 illustrates the PGM demand in 2021.
204 Table 84: PGM Demand 2021 Platinum Demand Palladium Demand Rhodium Demand • Autocatalysts (primarily for diesel engines • Wide range of jewellery • Many industrial uses • Autocatalysts (primarily for gasoline engines • Electrical components • Many chemical applications • Autocatalysts • Chemical catalysts • Glass fabrication • Electrical components Auto, 2751 koz, 41% Jewellery, 1751 koz, 27% Chemical, 660 koz, 10% Glass, 479 koz, 7% Medical, 234 koz, 3% Others, 816 koz, 12% Pt demand: 2021 6.7 moz Auto, 7688 koz, 81% Jewellery, 215 koz, 2% Elect., 659 koz, 7% Chem., 654 koz, 7% Dental, 183 koz, 2% Others, 137 koz, 1% Pd demand: 2021 9.5 moz Auto, 941 koz, 89% Chem., 61 koz, 6% Glass, 18 koz, 2% Others, 39 koz, 4% Rh demand: 2021 1.1 moz Source: SFA (Oxford). Note: Excludes physical investment products. All statistics and their analyses are accurate as of March 2022. 16.3.3 Supply Summary The majority of PGM resources are located in Southern Africa Table 85 which accounts for over 80% of global PGM resources (Crowson,2001 quoted in Cawthorn, 2010). Russian PGM supply, with the exception of PGMs produced in the Kondyor, Koryak and Urals regions, is mostly generated as a by-product of nickel mining (from Nornickel) and is the world’s largest source of palladium. Russia is also the second-largest producer of platinum and rhodium, accounting for approximately 25% of the world’s total PGM supply in 2021. Other key platinum mining regions include Zimbabwe’s Great Dyke, the Stillwater Complex in the US and the Sudbury Basin in Canada. 205 Table 85: Platinum Supply 2021 Platinum Supply Palladium Supply Rhodium Supply S. Africa, 4703 koz, 74% Zimb., 493 koz, 8% Russia, 643 koz, 10% Canada, 215 koz, 3% USA, 150 koz, 2% Other, 161 koz, 3% Pt supply: 2021 6.4 moz S. Africa, 2742 koz, 39% Zimb., 414 koz, 6% Russia, 2587 koz, 37% Canada, 499 koz, 7% USA, 501 koz, 7% Other, 333 koz, 5% Pd supply: 2021 7.1 moz S. Africa, 666 koz, 82% Zimb., 44 koz, 5% Russia, 73 koz, 9% Canada, 18 koz, 2% USA, 4 koz, 0.5% Other, 8 koz, 1% Rh supply: 2021 0.8 moz Source: SFA (Oxford) All statistics and their analyses are considered accurate as of March 2022. The near to medium term fundamental outlook for PGMs is robust. As the largest primary producer and recycler of PGMs in the world, Sibanye-Stillwater’s investments into high return, organic growth projects positions us well to support PGM demand driven by increasing social pull and regulatory drive for a cleaner environment. Climate change targets in Europe and other parts of the world has resulted in renewed interest in the hydrogen economy. Longer term production of green hydrogen for industrial use is supportive of demand for both platinum and iridium. With the medium term evolution of the automobile drive train from internal combustion engines (ICE) to greener technologies, such as battery electric fuel cell electric and hybrid vehicles we continue to monitor and evaluate the sector for entry points that meet our strategic objectives. As our customers’ needs change, the opportunity for us to further build on our mining platform and diversiC20 our offering will ensure that we remain preferred suppliers of strategic metals for tomorrow’s powertrains. Figure 91 illustrates the palladium, platinum and rhodium price trends since 2000, expressed as nominal USD/oz. 206 Figure 91 : Price trends 2000-2021 0 5,000 10,000 15,000 20,000 25,000 30,000 0 500 1,000 1,500 2,000 2,500 3,000 3,500 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 $/oz PGM prices Platinum Palladium Rhodium (rhs) Source: SFA (Oxford) 16.4 Metals Price Determination Sibanye-Stillwater considers multiple trailing averages and forecasting scenarios for determination of the commodity prices and exchange rates used as modifying factors for estimating Mineral Reserves. Mineral Reserves are estimated before the end of the calendar year. Sibanye-Stillwater uses the Q2 actuals process and forecasts for the remainder of the year to 31 December. The following are the commodities produced at Marikana, the scenarios considered and the final parameters chosen. 16.4.1 Exchange Rate The three year average ZAR/USD exchange rate parameters are given in Table 86. Table 86: Exchange Rates Three Year Average July 2019 to June 2021 30 Months Average January 2019 to June 2021 Forecast to December 2021 Three Year Average January 2019 to December 2021 Mineral Reserve Price ZAR/USD exchange rate 15.54 15.27 13.90 15.04 15.00 16.4.2 Platinum Group Metals Price Deck The three year average prices for the Platinum Group Metals (PGM) are tabulated below. For the Platinum Group Metals price deck, the QP forecasted the metal prices to the end of 2021 in order to determine a three year average. The QP has declared PGM Mineral Reserves with the metals process as in Table 87. 207 Table 87: PGM Deck Price Scenarios Unit Three Year Average July 2017 to June 2021 30 Months Average January 2019 to June 2021 Forecast to December 2021 Three Year Average January 2019 to December 2021 Mineral Resource Price Mineral Reserve Price Platinum USD/oz 959 934 1,125 965 1,500 1,250 Palladium USD/oz 2,164 2,013 2,722 2,132 1,500 1,250 Rhodium USD/oz 12,611 10,658 21,250 12,423 10,000 8,000 Iridium* USD/oz 2,463 2,261 5,725 2,839 3,000 2,500 Ruthenium* USD/oz 290 283 700 353 350 300 Nickel* USD/tonne 15,128 14,567 17,943 15,130 17,500 16,200 Copper* USD/tonne 6,819 6,688 9,612 7,176 10,000 8,950 Cobalt* USD/lb 17 17 21 17 25 22 Chrome* USD/tonne 143 147 153 148 165 150 Gold USD/oz 1,723 1,644 1,806 1,671 1,800 1,659 Basket Price USD/4Eoz 2,343 2,111 3,368 2,320 2,257 1,854 Basket Price R/4Eoz 36,400 32,224 46,832 34,897 33,857 27,809 16.4.3 Comparison to Previous Year’s Prices Table 88gives the price comparison between the Mineral Reserve prices at 31 December 2019 and 31 December 2021. Table 88: Comparison of Mineral Reserve Prices Current and Previous Year. 31-Dec-21 31-Dec-20 Precious metals USD/oz ZAR/oz ZAR/kg USD/oz ZAR/oz ZAR/kg Gold 1657 24,855 799,106 1,500 22,500 720,000 Platinum 1250 18,750 602,826 880 13,200 424,389 Palladium 1250 18,750 602,826 1,600 24,000 771,617 Rhodium 8000 120,000 3,858,084 5,650 84,750 2,724,772 Iridium 2500 37,500 1,205,651 1,450 21,750 699,278 Ruthenium 300 4,500 144,678 260 3,900 125,388 Base metals USD/lb USD/tonne ZAR/tonne USD/lb USD/tonne ZAR/tonne Nickel 7.35 16200 243,000 5.90 13,000 195,000 Copper 4.06 8,950 134,250 2.72 6,000 90,000 Cobalt 22.00 33,069 727,525 15.00 33,069 496,040 Chromium oxide (Cr2O3)2, (42% concentrate)1 0.07 150 2,250 0.07 160 2,400
208 17 Environmental Studies, Permitting, Plans, Negotiations/ Agreements with Local Individuals or Groups 17.1 Social and Community Agreements 17.1.1 Overview- Mine Community Development The section focuses on strategic programmes that cover the Local and regional priorities of economic development, education, health, community upliftment and the improvement of the people’s lives and long-term sustainability beyond the life of the Mine. These LED projects address the targeted development priorities of Rustenburg and Madibeng Local Municipalities as identified in their IDPs through the Social and Labour Plan commitments (SLP). An integrated approach is applied to ensure the implementation of economic development that will have a ripple effect and benefit the local municipal area as a whole. 17.1.2 LED Implementation Strategy Sibanye-Stillwater fosters and maintains constructive engagement with all stakeholders in order to deliver on our vision to create superior value for all stakeholders. We work closely with all stakeholders for the successful implementation of these projects. Our approach to stakeholders is based on understanding the context and the dynamic stakeholder universe and as such recognises the importance of all stakeholders in planning their development agenda. Sibanye-Stillwater is therefore committed to proactive, open and constructive stakeholder engagement, which informs participative decision-making. The stakeholder engagement process will ensure that: • There are regular engagements and quick responses to issues material to stakeholders • There is an accurate understanding of the influence of business activities on stakeholders and the potential impact stakeholders may have on the business, whether positive or negative, to enhance the engagement process. • Engagements are conducted in a timely, accurate and relevant manner • The continuous monitoring, reviewing and improvement of engagement activities LED projects cuts across three (3) focus areas. 17.1.2.1 Education and Skills Development Skills: Perpetuating the cycle of poverty, South Africa’s unemployment rate currently stands at 32, 5%, with even higher rates for youth, at more than 50%. As in the rest of Africa, where 60% of the workforce is under 30 years old, it is critical that South Africa turns its fast-growing young population into a 209 dividend rather than a burden. Education and training for future skills is a critical part of realizing this potential. Education: The root of unemployment is not only a lack of jobs; a key underlying issue is also the inadequately educated workforce. This challenge is likely to be amplified in the coming years due to the Fourth Industrial Revolution, characterized by fast-paced technological progress combined with other socio-economic and demographic changes, which will further transform labour markets. 17.1.2.2 Community Health and Safety Projects in this focus area are aimed at making sure that the health and safety of communities are taken care and would usually include the installation of high mast lights, construction of clinics, roads and sewer systems. 17.1.2.3 Agriculture United Nations has invited governments around the world placing small-scale farming at the Centre of regional, national and global agricultural, environmental and social policies; as well as elevate the role of smallholder farmers as stewards who manage and protect natural resources and drive sustainable development. Marikana has five SLPs, all of which are at various stages of execution. Three of these SLPs are in the North West, benefiting the communities in Madibeng and Rustenburg Local Municipalities, while the other two are in Limpopo, impacting communities in Nkumpi Lepelle. 17.1.2.4 Projects Progress The SLP projects for Marikana operations are listed in Table 89: Table 89: SLP Projects for Marikana No Project Name Status Year of Completion WPPL SLP (2014-2018) Projects 1 Tlhapi Moruwe School Completed 2014 2 Segwaelane School Completed 2014 3 EC School Completed 2017 4 Marikana School Completed 2017 5 Security Upgrading at GLC Clinics Completed 2017 6 Public Safety (High Mast Lights) Completed 2018 7 GLC Refuse Management Completed 2018 8 Renovate The Brits Forensic Mortuary Completed 2020 9 Segwaelane Elderly & Disabled Centre Completed 2021 10 Extension of Majakaneng Clinic Completed 2021 11 Grace Point Centre (MPHC) Completed 2021 12 Leokeng School Completed 2021 210 No Project Name Status Year of Completion 13 Subsistence Agri Projects (Livestock Infrastructure & Livestock Improvement) In Progress 2022 14 Majakaneng School In Progress 2022 15 Construction of Marikana CHC In progress 2022 EPL SLP (2014-2018) Projects 1 Wonderkop Road Completed 2013 2 Bapong Sportsfield upgrade Completed 2014 3 Basic Services (Sanitation) Completed 2016 4 Clinic Equipment and Computers Completed 2016 5 Maternity Homes for High risk Patients Completed 2016 6 Modderspruit Road Completed 2017 7 Bapong Road (Leokeng) Completed 2017 8 Job Creation (Brick Making) Completed 2017 9 Replacement of 2 x School health Services (2 Mobile Clinics) Completed 2017 10 Procurement of ambulances (19 Ambulances) Completed 2018 11 Institutional Support Completed 2018 12 Marikana Sportsfield upgrade Completed 2018 13 Segwaelane Sportsfield upgrade Completed 2019 14 Majakaneng Road Completed 07/2021 15 Segwaelane Road Completed 08/2021 16 Basic Services - Bapong Bulk Water Supply In Progress 06/2022 17 Majakaneng Sportsfield upgrade In Progress 06/2022 18 Job Creation (Bakery) Replaced by Bee Farming Project Section 102 12/2022 Pandora SLP (2018-2022) Projects 1 Refurbishment of Sonop Old Age Home Completed 2020 2 Refurbishment of Sonop Clinic Completed 10/2021 3 Upgrading of Tebogo Primary School In progress 12/2022 4 Upgrading of Sonop Primary School In progress 12/2022 Voorspoed SLP (2016-2022) Projects 1 Education Infrastructure – Sethethwa High School Completed 2018 2 Paving of Road to Hwelereng Clinic Completed 2019 3 Storm Water Management- Ledwaba Completed 2020 4 Portable Water Supply Mokotse Completed 10/2021 5 Paving of Turfpan Access Road Completed 11/2021 Doornvlei SLP (2016-2022) Projects 1 Provision of a Mobile Clinic Completed 2017 211 No Project Name Status Year of Completion 2 Construction of Dithabaneng Clinic In Progress 12/2022 17.2 Human Resources 17.2.1 Introduction This section includes discussion and comment on the human resources, health and safety related aspects associated with Marikana. Specifically, information is included on the current organizational structures and operational management, recruitment, training, productivity initiatives and remuneration policies, industrial relations, safety statistics and performance. Marikana follows the Sibanye-Stillwater Code of Ethics, which is fully compliant with the Sarbanes- Oxley Act of the United States of America. This policy was adopted and communicated to all employees. A Human Rights Policy has also been adopted, which confirms full compliance with all applicable International Labour Organization Conventions. 17.2.2 Human Resources 17.2.3 Legislation Marikana is committed to promoting Historically Disadvantaged South African’s (HDSA) in its management structure by instituting a framework geared toward local recruitment, and human resources development. Vacancies are primarily filled by candidates from local communities. Where specialist skills are not available locally they are sourced from outside local communities. Marikana’s long term objective is to have these skills shortages addressed via skills development programmes. The Mine’s long-term objective is to have these skills shortages addressed via skills development programs(Table 90). Labour distribution and availability are shown in Table 91 and Table 92). Employee turnover is summarised in Table 93. and Table 94 shows labour unavailabity and absenteeism Various regulatory authorities, in addition to mining and labour codes, govern labour legislation in South Africa. In general, these are well established in conjunction with current operating policies and form the cornerstone of human resource management. High level compliance in terms of the following key acts and associated regulations was assessed: • Constitution of the RSA (Act 108 of 1996) (Constitution) • Mine Health and Safety Act, (Act 29 of 1996) and amendments (MHSA) • The Occupational Health and Safety Act (85 of 1993) (OHSA) • LRA, 1995 as amended • Employment Equity Act, 1998 with specific reference to medical testing and HIV/AIDS • Compensation for Occupational Injuries and Diseases Act, 1993 • Basic Conditions of Employment Act, 1997 • Employment Equity, 1998 and • Promotion of Equality and Prevention of Unfair Discrimination Act, 2000.
212 Table 90: Undertaking and Guidelines Table 91: HDSA in Management as at the end December 2021 Prescribed Target Current 2021 Prescribed % Occupational Level/Paterson Band Designated Non- Designated % Compliance Top Management (Board)* 50% 6 7 46,2% 50% Senior Management (EXCO)* 50% 14 23 37,8% 50% Senior Management (Other)* 60% 17 25 40,5% 50% Middle Management Levels 60% 20 20 50,0% 53% Junior Management Levels 70% 146 88 62,4% 58% Total HDSAs in Management (including Junior Management) 159 6 7 *These numbers are reflected in accordance with the Mining Charter requirements and these individuals are not employed by the operation. Table 92: Breakdown of Employee Profile as at the end December 2021 Grade Occupational Level Number of Employees E Band Senior Management 40 D Band Professionally Qualified, Experienced Specialists and Middle Management 234 C Band Skilled Technical, Academic Qualified, Junior Management and Supervisors 2,473 B Band Semi-Skilled and Discretionary Decision Making 6,439 A Band Unskilled and Defined Decision making 8,596 NG Learners and Trainees 181 Total Permanent and Temporary Employees 17,963 Contractor Employees 3,413 Total Head Count 21,376 Undertaking Marikana Operations is committed to attaining the 40% HDSAs in management target as set by the DMRE and recognizes that this refers to Management in the D, E and F Patterson bands. Guidelines Build capacity within the organization through HRD initiatives with preference given to individuals from designated groups. These employees to form the pipeline for the Company’s talent pool and succession planning. 213 Table 93: Employee Turnover Reason 2018 2019 2020 2021 Death 142 134 105 142 Dismissal (incl. Desertion) 344 471 446 344 Medical 69 42 89 69 Resignation 354 207 136 354 Retirement 99 98 113 99 Retrenchment (incl.VSP) 1,004 2,004 1,103 1,004 Grand Total 2,012 2,958 1,992 1,009 Table 94: Labour Unavailability and Absenteeism Description 2018 2019 TC 3.01% 3.59% Leave 8.32% 8.48% Unplanned Absence 11.93% 11.50% Strike Action 0.26% 0.00% Total 23.52% 23.57% Description 2020* 2021* AWOP 2.44% 1.23% Leave 5.92% 6.04% Mine Accident 0.26% 0.34% Other 2.44% 1.87% Sick 3.34% 4.13% Training 1.85% 1.93% COVID 0.02% 0.03% Total 16.28% 15,58% *Change in management in 2019 resulted in a change of KPI’s in reporting. 17.2.4 Human Resource Development (Training) Sibanye’s Human Resource Development (HRD) Model aims to ensure development of requisite skills in respect of learnerships, bursaries (core and critical skills), artisans, Adult Education and Training (AET) (Level I, II, III), AET Level 4/NQF Level 1 and other training initiatives reflective of demographics as defined in the Mining Charter and MPRDA. All efforts in this regard have been aligned with the National Development Plan and the UN Global Goals for Sustainable Development in relation to education, gender equality, reduced inequalities, decent work and economic growth. 214 The primary objectives of Sibanye’s HRD are: • The availability, in terms of quality, quantity, and Employment Equity, of the range of skills required to access, extract and process the orebody productively and safely, on a sustainable and environmentally responsible basis, inclusive of production, technical, support, administrative competencies and leadership development and • The skilling of employees in portable competencies, which relate to existence outside the mining environment and which can be applied to sustain individuals and communities once mining operations are ended. Sibanye-Stillwater Academy (SSA), a 100% owned subsidiary of Sibanye, provides HRD services to Marikana Operations. SSA is also fully accredited by the Mining Qualifications Authority (MQA), and has program approval in a number of other SETA’s, giving it the ability to provide recognized and accredited education and training in a number of non-mining fields. The ability to meet its undertakings is so far as they relate to Leadership Development, AET, Technical Skills and Portable Skills is therefore enhanced, and a fully operational functional satellite campus of the SSA operates from the Marikana Operations. While Marikana Operations is fully accountable for the identification and fulfilment of its HRD needs and has substantial discretion based on its own business needs and circumstances, it operates within the ambit of the Sibanye-Stillwater HRD Model. Marikana Operations submits an Annual Workplace Skill Plan/Annual Training Report (WSP) to the MQA. During 2019, Marikana Operations did undergo a restructuring and downscaling process and hence only spent approximately 2.8% of payroll on employee training and development programs. Operational challenges in lieu of COVID-19 have also subsequently negatively impacted on HRD plans and targets had to be adjusted accordingly. Sibanye-Stillwater incorporated a plan of action to make up some of the backlogs as part of our C2021 plan. Specific areas of focus in the training and development programmes include: • Safe working practice training by means of programmes aligned with the requirements of the National Qualifications Framework • Functional literacy and numeracy • Interventions aimed at improving the business awareness and teamwork of employees at the lower levels of the organization in particular • Improved middle management skills through the implementation of an internal leadership programme to help fulfil the human resources requirement of the Mining Charter • Systems to track and manage, on an integrated basis, employee development and performance and • Portable skills training. • “New way of communication” training. 215 17.2.5 Remuneration Policies Marikana Operations operates remuneration and employee benefit policies that recognize labour market conditions, collective bargaining processes, equity and legislation. The provisions of the Sibanye-Stillwater approval framework guide remuneration policies. 17.2.6 Industrial Relations Industrial relations are managed at a number of levels and in a number of formalized structures, encompassing the corporate and mining asset domains in accordance with a number of key driving factors. These include the prevailing legislative requirements, regulatory bodies, labour representation, collective bargaining arrangements, sectoral and operation specific employer-employee agreements, and the quality of labour relations management philosophies and practices. An Employee Relations/Engagement framework also governs all engagements with organized labour and other stakeholders. The principal strategy elements are to entrench an improved understanding of the business imperatives on the part of labour, appropriate and timely intervention to pre-empt industrial relations issues and timely delivery by management on its undertakings to labour and to maintain labour harmony continuously. Approximately 90% of the permanent employees of Marikana Operations are paid up members of a registered trade union. The substantial majority of these unionized employees are from the lower skilled level and are represented by the Association of Mineworkers and Construction Union (Amcu). Historically, a trade union with such a constitution have exercised a strong influence over social and political reform. The labour legislative framework reflects this by strongly empowering trade unions in the collective bargaining processes. The clear implication is that industrial relations are an area of focus for Marikana Operations. 17.2.7 Employment Equity and Women in Mining (WIM) The purpose of the Employment Equity plan is to ensure that a demographical appropriate profile is achieved through the participation of Historically Disadvantaged Persons (HDPs) in all decision-making core occupational categories and people with disabilities at the mine. Employment equity strategies are aligned to succession planning, development of the company’s talent pool, learner development programmes, core and critical skills training programmes, career development plans, mentoring and coaching. The following Sibanye-Stillwater principles guide the way in which Employment Equity is implemented at Marikana Operations, and to further comply with the Company’s Ethics and Human Rights policies: • Recognizing historic inequalities, HDSAs and women with recognized potential are afforded special opportunities and additional support to realise their potential • To fill each position in the Company with a fully performing individual. Thus, the Company will not create phantom jobs nor make token appointments • Diversity is encouraged in the workplace and any form of racism is not tolerated • Some employees in management positions may be involuntarily redeployed to make space for HDSAs and women
216 • All employees are developed to ensure that they are fully performing in their current jobs and, where applicable, to prepare them for future opportunities and • In placing women in jobs, the Company will take cognisance of the special risks to which women of child-bearing age, pregnant and lactating women should not be exposed. Marikana Operations is required to translate the Sibanye-Stillwater company strategy to five (5) year action plans that are implementable and measurable. Marikana Operations is committed to creating a workplace in which individuals of ability and competency can develop rewarding careers at all levels regardless of their background, race or gender. Marikana Operations’ employment practices and policies emphasize the equal opportunity for all, and aim to identify, develop and reward those employees who demonstrate qualities of individual initiative, enterprise, commitment and competencies. Employment Equity policies also aim to create an inclusive organizational culture in which all employees are valued. The implementation of Employment Equity is overseen by senior management and is at the core of the operation’s strategy. Where appropriate, Employment Equity is implemented in consultation with employee representative bodies. As a key business imperative for Marikana Operations, Employment Equity is critical in assisting the Operation to place competent employees in the correct jobs aligned with the Operation’s objectives. These are: • Marikana Operations is committed to developing its employees to their greatest potential, which will contribute to the achievement of the Operation’s objectives • Marikana Operations recognizes the need for continued investment in its employees through training and development, which is demonstrated through training and development opportunities and job placements with a focus on the development of key competencies, career path progression and retention of talent and • Marikana Operations has adopted a proactive recruitment, selection and appointment policy, which favours candidates from designated groups. This has assisted the Operation in working toward the achievement of numerical goals of the Operation’s Employment Equity(EE) Plan. WPPL incorporated the Mining Charter III EE requirements and guidelines in the SLP from 2020. Table 95 and Table 96 provides EE status as at December 2020 with specific focus on HDP and Female representation, people with disabilities and core & critical skills. 217 Table 95: Marikana Total Employees – Snapshot Report for the Month December 2021 Occupational Level Male Female Foreign Nationals Total A C I W A C I W Male Female Top management Senior management 13 1 2 17 1 0 0 3 3 0 40 Professionally qualified and experienced specialists and mid- management 71 6 5 83 36 3 2 23 4 1 234 Skilled technical and academically qualified workers, junior management, supervisors, foremen, and superintendents 1,383 17 3 431 375 3 5 94 131 2 2,444 Semi-skilled and discretionary decision making 4,502 8 0 15 277 3 0 9 1,543 0 6,357 Unskilled and defined decision making 6,356 2 2 4 833 3 0 0 1,206 12 8,418 Total Permanent 12,325 34 12 550 1,522 12 7 129 2,887 15 17,493 Employee-Temporary 214 1 1 10 237 0 0 6 1 0 470 Grand Total 12,539 35 13 560 1,759 12 7 135 2,888 15 17,963 Table 96: Marikana Total Contractors (excluding Ad-Hoc Contractors) Occupational Level Male Female Foreign Nationals Total A C I W A C I W Male Female Senior management Professionally qualified and experienced specialists and mid- management 7 0 1 13 5 0 0 3 0 0 29 Skilled technical and academically qualified workers, junior management, supervisors, foremen, and superintendents 20 0 1 26 1 0 0 1 1 0 50 Semi-skilled and discretionary decision making 370 6 2 93 102 1 0 20 23 2 619 Unskilled And Defined Decision Making 959 2 1 25 175 0 0 10 145 1 1,318 Total Permanent 953 3 0 18 245 1 0 3 172 2 1,397 218 17.3 Health and Safety 17.3.1 Policies and Procedures Since Sibanye-Stillwater’s inception, Marikana Operations has formed part of the Health and Safety Strategy and Policy development process, as well as the adoption and implementation thereof. The Safe Production Strategy that was developed as part of an ongoing safety improvement journey, takes into account “fit for purpose systems” such as ISO 45001 that was published during 2018. The Sibanye-Stillwater Health and Safety Strategy and Policy is further aligned with the Mine Health and Safety Act, the International Council on Mining & Metals, the World Bank Policies and Guidelines, International Finance Corporation Operational Policies and International Labour Organisation Conventions. 17.3.2 Statistics Table 97 presents safety statistics for Marikana Operations and includes the total number of fatalities, fatality rate and the lost day injury frequency rate (LDIFR) from C2016 to C2021. Table 97: Safety Statistics Units C 2016 C 2017 C 2018 C 2019 C 2020 C 2021 Fatalities (No) 3 4 2 3 2 1 Fatality Rate (per mmhrs) 0.05 0.05 0.03 0.04 0.05 0.03 LDIFR (per mmhrs) 5.1 4.30 4.07 5.04 5.27 7.56 MHSA Section 54’s (No.) 49 34 23 18 11 17 mmhrs = million man hours worked 17.3.3 Occupational Health and Safety Management As part of the rollout of the Safe Production Strategy, the management of Critical Controls, Rules of Life, Risk Management as well as management of A Hazards were a key focus area at the operations. The challenges in terms due to COVID-19 are ongoing and are dealt with commendably all at the shafts. During October 2021, the Marikana Operations achieved Four million fatality-free shifts prior to the fatality that occurred on 23 November 2021 17.3.4 HIV/AIDS Marikana applies HIV education and preventative measures, including the Highly Active Anti- Retroviral Therapy programme to manage the risk of HIV. 219 17.4 Terminal Benefits The total terminal benefits liability (TBL) for Marikana Operations has been determined by consideration of the TBL and the various employee requirements of the LoM profile. This number has been estimated at ZAR 1,477million and incorporated in the respective final years of the various shafts comprising the LoM plan. 17.5 Environmental Studies 17.5.1 Introduction As part of the Sibanye-Stillwater Integrated, Compliance, Governance and Risk (ICGR) framework, the Company has embedded a process for improved regulatory risk profile and action plans to address any gaps in the identification of risk, level of adequacy and effectiveness of control measures. This has provided the Environmental and other Departments with a much clearer picture of all the legal requirements, its risk exposure and what mitigatory actions (compliance risk management plans) need to be put in place to improve and ensure compliance. Updated and detailed public reports are available at Environment | Sibanye-Stillwater (sibanyestillwater.com). The following generic environmental risks have been identified and are applicable to the Marikana Operations: • Third party liability claims because of uncontrolled grazing on mine-owned properties • Non-compliance with applicable environmental legislation • Aging infrastructure and its contribution toward legal non-compliances (environmental) • Increase in illegal activity, sabotage and theft of environmental infrastructure leading to increased frequency and severity of associated environmental non-compliances • Failure to obtain applicable environmental approvals, timeously because of slow responses from Regulators in respect of approving licenses and amendments • Undue reliance on Rand Water Board (with a resultant increase in water costs) • Poor surface and ground water quality • Climate change and global warming. In addition, and from an Environmental, Social and Governance (ESG) perspective, the following key environmental legislation, and its associated subsequent amendments, was identified to be applicable, wholly or partially, to the Marikana Operations: • Constitution of the RSA, 1996. • The Companies Act, Act 71 of 2008. • King IV Report on Corporate Governance for South Africa 2016 (Institute of Directors in Southern Africa NPC). • Promotion of Administrative Justice Act, Act 3 of 2000. • Protection of Personal Information Act, Act 4 of 2013.
220 • Minerals & Petroleum Resources Development Act (MPRDA), Act No 28 of 2002 and all its Regulations and subsequent Amendments. • National Environmental Management Act (1998). • National Environmental Management: Biodiversity Act, Act No 10 of 2004. • National Environmental Management: Waste Act, 2008. • National Nuclear Regulatory Act, 1999. • National Environmental Management: Air Quality Act (NEM:AQA), Act No 39 of 2005. • National Water Act (NWA), Act No 36 of 1998. • Water Services Act (NWS), Act 108 of 1997. • Labor Relations Act, Act 66 of 1995. • Mineral and Petroleum Resources Royalty Act 28 of 2008. • Hazardous Substances Act, Act No 15 of 1973. • National Heritage Resources Act (NHRA), Act No 25 of 1999. • National Forest Act, Act No 84 of 1998. • National Road Traffic Act, Act 93 of 1996. • Road Transportation Act, Act 74 of 1977. • Fertilizers, Farm Feeds, Agricultural Remedies and Stock Remedies Act, Act No 36 of 1947. • Conservation of Agricultural Resources Act (CARA), Act No 43 of 1983. • National Veld and Forest Fire Act, Act No 101 of 1998. • National Environmental Management: Protected Areas Act, Act 57 of 2003. • Promotion of Access to Information Act, 2000. • Agricultural Pest Act, Act No 36 of 1983. An important change in the regulation of mining-related environmental activities was that on 8th December 2014, with the launch of the so-called “One Environmental System” (OES), the Minister and thus the newly-renamed DMRE became the Competent Authority for environmental issues within the mining industry. The Minister of the Department of Minerals, Resources and Energy (DMRE) became the appeal authority for mine environmental issues. Since its inception in 2014, the OES has not as yet fully taken off as not all of the relevant Government Departments/Regulators seem to be on-board with the new, stricter approvals timeframes and/or other OES requirements which has led to the implementation of OES being, at best, mediocre and at worst, not meeting applicants’ expectations. In November 2015, new Regulations regarding Financial Provision (FP) were gazetted, with onerous legal obligations around financial provisioning on a number of closure-related issues. The mining industry has and is in the process of challenging these proposed FP Regulations, with a view to have the most onerous Regulations excluded from any revised FP Regulations. Stakeholder engagement and consultation on the revised FP Regulations is ongoing, and while the compliance date for the 2015 FP Regulations had initially been set as 20 February 2020, this compliance date was subsequently revised to 19 June 2021. Further stakeholder engagement and consultation by the DMRE on the proposed amended FP Regulations will take place in 2021. 221 17.5.2 Baseline Studies 2012 17.5.2.1 History The first Environmental Management Programme (EMPr) was approved in 1996. The EMPr was modified via various amendment applications. A new EMPr for WPL and EPL was constructed in 2005 to combine the 1996 EMPr and all modifications into a single document and to align the with MPRDA of 2002 and Mineral and Petroleum Development Regulation- Government Gazette No 26275 (23 April 2004). A revised and consolidated EIA and EMPr for WPL and EPL respectively was completed in November 2012. This was submitted to the North West Department of Mineral Resources and Energy, in November 2012 and approved in 2017. WPL and EPL are separate Mining Rights and require separate submissions for permitting and are recorded as separate documents, however the EMPr’s are aligned. The purpose of the amendments of the baseline EIA and EMPr intended to achieve the following: • The consolidation of the existing approved EMPrs, and the amendments thereof into one • EMP for the Mining Rights Areas comprising WPL and EPL; • The update of the EMPrs according to information from a number of technical studies and environmental projects and programmes relating to air quality management, water management as well as land and waste management; • The integration of the outcomes of the Closure Strategy for the Marikana operations, including the end land use framework for Marikana within the updated EMPrs; • The alignment of the EMPrs with new environmental legislation; and • The amendment of EMPrs in order to obtain approval for the new proposed service and maintenance infrastructure developments • Amendments to these EMPrs have been undertaken for specific projects triggering environmental authorisations since the submission and approvals of the EMP’s. Specific studies are listed in the References Section. As at 31 December 2021, the EMPr is still relevant and remains in practice with minor adjustments or additions where a need is identified. 17.5.2.2 Impact Assessment 2012 The assessment of the impacts for the 2012 EMPRs were conducted according to a synthesis of criteria required by the integrated environmental management procedure. This methodology was constructed by SEF, the consultants who compiled the studies, The methodology used was not the Lonmin methodology at the time and Sibanye has a more intense risk-based assessment procedure that it is now applying. SEF methodology was acceptable for the purposes of the study. • Extent - The physical and spatial scale of the impact is classified as: • Duration - The lifetime of the impact, that is measured in relation to the lifetime of the proposed operations: 222 • Intensity - The intensity of the impact is considered by examining whether the impact is destructive or benign, whether it destroys the impacted environment, alters its functioning, or slightly alters the environment itself. • Probability - This describes the likelihood of the impacts actually occurring at some point during the mining cycle. • Mitigation - The impacts that are generated by the development can be minimised if measures are implemented in order to reduce the impacts. The mitigation measures ensure that the operation considers the environment and the predicted impacts in order to minimise impacts and achieve sustainable development. o Determination of significance – without Mitigation o Determination of significance – with Mitigation • Ranking, Weighting and Scaling o Identifying the Potential Impacts without Mitigation (WOM) - Following the assignment of the necessary weights to the respective aspects, criteria are summed and multiplied by their assigned weightings, resulting in a value for each impact (prior to the implementation of mitigation measures). Equation 1: Significance Rating (WOM) = (Extent + Intensity + Duration + Probability) x Weighting Factor o Identifying the Potential Impacts with Measures (WM) - In order to gain a comprehensive understanding of the overall significance of the impact, after implementation of the mitigation measures, it was necessary to re-evaluate the impact. o Mitigation Efficiency (ME) - The most effective means of deriving a quantitative value of mitigated impacts is to assign each significance rating value (WOM) a mitigation effectiveness (ME) rating. The allocation of such a rating is a measure of the efficiency and effectiveness, as identified through professional experience and empirical evidence of how effectively the proposed mitigation measures will manage the impact. Thus, the lower the assigned value the greater the effectiveness of the proposed mitigation measures and subsequently, the lower the impacts with mitigation. Equation 2: Significance Rating (WM) = Significance Rating (WOM) x Mitigation Efficiency Or WM = WOM x ME o Significance Following Mitigation (SFM) - The significance of the impact after the mitigation measures are taken into consideration. The efficiency of the mitigation measure determines the significance of the impact. The level of impact is therefore seen in its entirety with all considerations taken into account. A summary of environmental Impacts is given in Table 98. Table 98: Summary of Anticipated Environmental Impacts (revised EMP,2012) Key Issue* Positive/ Negative Impact Applicable Project Phase Significance Rating before Mitigation Significance after Mitigation 223 Operational Mine Closure Water Resources (Section 17.5.6) Negative Yes Yes Medium-High Medium Soil Contamination. Land Use and Land Capability (Section 17.5.9) Negative Yes Yes Medium-High Medium Damage to Biodiversity (Section 17.5.5) Negative Yes Yes Medium-High Medium Air Quality Impacts (Section 17.5.4) Negative Yes No Medium Low-Medium Noise. Shock and Vibration Negative Yes No Medium-High Low-Medium Increased Waste Generation Negative Yes Yes Medium-High Medium Social and Cultural Impacts: Heritage Resources Negative Yes No Medium-High Low-Medium Social and Cultural Impacts: Employment Opportunities (Section 17.1 and 17.2) Positive Yes No Medium-High N/A Utilization of available land (Section15) Positive Yes No Medium-High N/A *Additional Information from The EIA or more recent data on some key issues can be found in the sections listed Results from the Emissions Inventory and Impact Assessment studies (Lonmin, 2010) • The predicted metal ground level concentrations (due to wind blown dust from the tailings dams), at the closest sensitive receptors were all well within the most stringent health effect screening levels for all averaging periods. • The predicted cancer risk due to metal emissions from tailings wind blown dust was predicted to be “low” and “very low” (as characterised by the New York Department of Health). Results for Atmospheric Impact Report (2013) Operating Mine. • For mining activities the predicted maximum 24-hour and annual average ambient concentrations of particulates (PM10 and PM2.5, SO2,NOX) exceed the respective current and future national ambient air quality standards in the vicinity of the mining operations at WPL and EPL as well as over the central parts of the Northwest Operation site. Sibanye-Stillwater Smelter operations has since implemented a significant amount of measures to reduce SO2 emissions and is currently operating well below the 2020 MES. • Predicted dust deposition is well below the national limit value for light commercial areas. • For emissions from the three process units and mining combined the predicted ambient concentrations of Pb, HCl, NH3 and Cl2 are low and well below the respective national ambient air quality standards and ambient guidelines. Noise Survey Report (Lonmin-Airshed, 2015) for update see Section 17.5.3.5.
224 • Sampled noise levels were, for reference purposes, compared to both residential and industrial noise level guidelines. • Given the reported survey results it is concluded that noise levels with the Marikana operational area generally in exceedance of noise levels guidelines for residential areas but not for industrial areas. Elevated noise levels are as a result of a combination of traffic (road and rail), community and industrial activity. • To specifically determine the Marikana Operations’ contribution to noise levels in the study area, detailed source characterisation and noise propagation simulations is required. Given high noise levels within communities and public road traffic as well as separation distances between communities and Marikana activities, its impact is likely to be less noticeable. Tailings Dam 8 Environmental Impact Assessment (2014) • EIA for a new tailings dam to be built • No fatal flaws • Authorization has been obtained. 17.5.2.3 Methodologies for Impact and Risk assessment since 2012 The assessment results and criteria in the studies presented above are as submitted by the companies undertaking the assessments. Sibanye uses consultants for the specialists' studies. Each company has its own methodologies that it applies. Where there are no material conflicts with Sibanye-Stillwater’s criteria, other studies or regulatory requirements the methodologies are accepted as valid. 17.5.3 Zone of Influence 17.5.3.1 Studies and Methodologies The Zone of Influence of a project (Marikana as a whole) is defined as the area within which it has or can have material impacts or can influence impacts due to the establishment and continuation of the project’s activities, products or services. The Zone of Influence is unique to each project and each aspect thereof, is larger than the actual project footprint and can either be positive or negative. The Zone of Influence is determined by evaluating and mapping the following environmental and social components of the project: • Footprint and areas directly adjacent to the infrastructure erected for the project • The areas affected due to the following definitions 1. Secondary impacts arise from other impacts that are directly due to the development. 2. Induced impacts are due to unplanned/unintended/secondary activities that are ‘catalysed’ by the project. 3. Cumulative impacts are results of numerous individual activities, which might not be material on their own, but which can interact or combine to cause material impacts. 225 • These areas can typically be impacted by surface and groundwater abstraction, surface and groundwater usage or discharges, ground stability, air quality, noise, visual and soil impacts, as well as invader vegetation infestation, protected areas destruction, loss of important biodiversity areas, and any other material impacts that may be identified during the Zone of Influence determination • Areas that will be deriving economic benefits from the project like adjacent towns and communities, as well as labour sending areas and • Surrounding environmental areas that can benefit or be impacted upon by the project. For each environmental aspect, the Zone of Influence is determined independently and displayed on a map. A composite Zone of Influence for the entire project is then eventually determined. For its major environmental aspects (e.g.: water discharges and air emissions) and resulting material impacts Marikana has extended monitoring programs and management systems in place to ascertain its impact on the environmental and surrounding communities and therefore has a very good understanding of its material impacts on the above-mentioned areas. Management systems and procedures are in place to deal with those identified material impacts. Specialist studies required by environmental authorisations and Environmental Impact Assessments (EIA’s) are further valuable sources of information to determine those areas potentially impacted upon by the project. Future specialist studies are expected to include an update or revision of the Zone of Influence map for each aspect and material impact as well as a combined Zone of Influence per aspect. These are updated at varying frequencies as informed by specialist studies. Composite Zone of Influence maps have not yet been compiled for Marikana. Information on impacts is given in Sections 17.5.2, 17.5.5, 17.5.6 and 17.5.9.3. 17.5.3.2 Groundwater The groundwater Zone of Influence represents the following two scenarios: • Secondary Impacts: These are currently defined by the pollution plumes emanating from waste storage facilities, namely the TSFs and Surface Rock Dumps (“SRDs”); and • Induced and Cumulative Impacts: These are presented by the dewatered areas to allow for mining. A comprehensive update of the groundwater specialist studies was undertaken in 2021 and will be completed in 2022, this will be incorporated into the 2023 TRS. The current groundwater data indicates that the zone of influence from a water quality perspective is largely limited to the source (boreholes located at the TSFs, dirty water dams and waste rock dumps) and plume boreholes (boreholes located within the expected plumes of the TSFs, dirty water dams and waste rock dumps). No dewatering impacts are expected or are highly localised to the shaft areas. Impacts from groundwater contamination may however occur on the adjacent Maretlwana, Sterkstroom and Kareespruit, due to the location of the contamination sources within the buffer area, and in some case historical area of the wetland. These impacts occur as a result of ground-surface water interactions. Refer to the Surface Water discussion for further information. 226 17.5.3.3 Surface Water The surface water Zone of Influence is made up of areas influenced by secondary, induced and cumulative impacts. However, the assessment of cumulative and induced impacts still requires further investigation as these impacts may be far-reaching and they become less apparent due the activities of others in the catchment. Alternatively, they may only become apparent in the future dependent on the environmental context, such as the climatic conditions. The Zone of Influence’s represented below consider the secondary impacts that have been evaluated as associated with the current operational area of the mine. Secondary Zone of Influence The watercourses within this section of the Zone of Influence represent activities within the wetlands, drainage lines, rivers and the recommended buffer areas that have the potential or have already caused a change to the ecological function and service provision of the wetlands. An updated and detailed wetland delineation is being undertaken to ascertain an improved zone of influence. Induced and Cumulative Impacts Zone of Influence The Zone of Influence for the induced and cumulative impacts has been determined based on the compliance of the water quality of the surface water bodies. The end of the impact is considered to be the point at which 95% compliance to the Resource Water Quality Objectives (“RWQO”) has been achieved for the year to date. The use of water quality as a means of determining compliance implies that all potential impacts whether from direct discharges, diffuse seepage and/or groundwater interflows would be assessed against the current applicable standards. The Marikana operations sprawl across two main catchments, namely the Sterkstroom and the Kareespruit. The Maretlwana a tributary of the Sterkstroom is also influenced by the Marikana Operations. After the Maretlwana and Sterkstroom form a confluence the stream is known as the Gwathle, but no mining activities occur within this reach. The Sterkstroom has been assigned RWQOs, but the Kareespruit has note, hence the Crocodile West RWQOs are used instead for this reach. The criteria to meet the zone of influence set-point have not been satisfied by the end-points currently identified in Figure 92. However no further downstream data was available in 2021 to assess the use of points further downstream, it is also not advised to move the zone of influence to a downstream point but rather encourage, as is planned, that mitigation and management measures be implemented to achieve improved compliance at the set end-points. It is also noted that the basis for several stringent RWQO limits is not understood in the context of the historic and current water and land-use activities within the catchment as well as the relation with the downstream water user requirements. Sibanye- Stillwater continuously engage the Department of Water and Sanitation in to arrive at realistic, science-and-risk based limits both in the water use licences and the RWQOs. The Sterkstroom end-point, WP S 21 shows 75% compliance with risks of eutrophication but no toxic impacts are expected as all parameters are below critical environmental limits. The Kareespruit end- point, EP S 03 shows 55% compliance, also showing likely eutrophication, however no toxic impacts are expected. Integrated catchment management, implementation of mitigation, restoration and improved control measures are planned to improve compliance to the RWQOs. 227 Figure 92: Marikana Surface Water Zone of Influence 17.5.3.4 Visual Zone of Influence A Visual Zone of Influence for the Marikana Operations has not as yet been developed and will be developed in 2021/2022 given budgetary and time constraints. 17.5.3.5 Noise Zone of Influence An environmental noise survey was completed in 2020 (Gruenewaldt,2020). The main objective of the noise survey was to determine, through measurement, ambient noise levels around SS Marikana operations in comparison with noise level guidelines. In South Africa, provision is made for the regulation of noise under the National Environmental Management Air Quality Act (NEMAQA) (Act. 39 of 2004) but environmental noise limits have yet to be set. It is believed that when published, national criteria will make extensive reference to SANS 10103 of 2008 ‘The measurement and rating of environmental noise with respect to annoyance and to speech communication’. This guideline gives levels for outdoor noise that should not be exceeded. Survey sites were selected in consultation with the previous noise survey completed for the area in 2015 (von Reiche & Akinshipe, 2015) and the location of nearby noise sensitive receptors (NSRs). A total of 10 survey points was selected. The following summarizes the main findings and conclusions from the noise survey:
228 • The acoustic climate of the area is characterised by a variety of public and industrial noises. Noise sources include industrial activities (i.e. SS Marikana mining and processing operations), community activities (i.e., pedestrians, music, children playing, domestic animals, etc.), heavy and light vehicle traffic, rail and air traffic, as well as natural sources such as birds, insects and frogs. • Day-time acoustic climate: Only Noise levels recorded at Site 1 were in exceedance of the IFC day-time noise level guideline of 55 dBA for residential areas. • Night-time acoustic climate: noise levels are typical of Suburban districts with little road traffic industrial districts. Noise levels at most locations (apart from Site 3, Site 7 and Site 9) are in exceedance of the IFC night-time noise level guideline of 45 dBA for residential areas. • Day/night acoustic climate: noise levels are typical of day-time suburban districts with little road traffic) and typical of day-time industrial areas. • Comparison of measured noise levels during the 2015 and 2020 surveys: o o The day-time measured noise levels were similar during the two surveys with the exception of Site 7 that measured 68 dBA during the 2015 survey and 37 dBA during the 2020 survey. The high noise levels during the 2015 survey was due to a passing train. o o The night-time measured noise levels were similar during the two surveys with the exception of Site 2 that measured 37.8 dBA during the 2015 survey and 53.8 dBA during the 2020 survey and Site 9 that measured 55.5 dBA during the 2015 survey and 41.4 dBA during the 2020 survey. 17.5.4 Climate Change and Greenhouse Gas Emissions, Air Quality Sibanye-Stillwater considers climate change as one of the most pressing global environmental challenges of our time. Sibanye-Stillwater recognises the importance of proactively managing its carbon footprint in the global context and is committed to contributing to a global solution through the deployment of responsible strategies and actions. To this effect, Sibanye-Stillwater monitors and reports on its carbon emissions. Sibanye-Stillwater uses the Department of Forestry, Fisheries and the Environment’s Technical Guidelines for monitoring, reporting and verification of greenhouse gas emissions by industry (Version No. TG-2016.1 of April 2017) and the World Resources Institute: Greenhouse Gas Protocol for determining its carbon inventory. Furthermore, Sibanye-Stillwater is committed to contributing to a global solution by deploying responsible strategies and actions in the areas within which the mines operate: • Develop and implement an energy and decarbonisation strategy. • Drive and achieve a carbon neutral position by 2040. • Drive an absolute reduction of Scope 1, 2 and 3 Greenhouse Gas Emissions (GHG) emissions to achieve a science-based target (Science Based Target Initiative (SBTi) approved) that is required to keep global temperature increases below 2°C compared to pre-industrial temperatures. • Drive and implement initiatives and programmes to assess and understand GHG emissions profile and carbon footprint in order to optimally reduce the mine’s carbon footprint. 229 • Formulate a position on, and investigate the feasibility of carbon offsets in line with legislation and other principles that can be used to offset carbon emissions and that has the potential to offset the financial liability imposed by a carbon tax in specific jurisdictions. • Promote awareness and drive initiatives to combat the impact of global warming and climate change. • Deploy effective climate risk management strategies, taking into consideration ESG risks and stakeholder perceptions of risks. • Adhere to the requirements as set out in Sibanye-Stillwater’s policies, position statements and procedures. Marikana activities influence the ambient environment in terms of particulate matter (TSP, PM 10 and PM 2.5 ) and sulphur dioxide (SO 2 ) (as the significant pollutants). Sources include mining and associated activities, vehicle entrainment from paved and unpaved roads, materials handling (i.e. loading and unloading), wind erosion from TDFs, and emission from the processing activities. The latest Air Quality Scoping study (Gruenewaldt, 2017) showed that Marikana’s emissions for the current and projected operations configurations were did not exceed the National Ambient Air Quality Standards Table 99, and Figure 93 and continues to be below these limits through 2021. Table 99: Marikana tCO2e Emissions Inventory 2021 Scope of Emissions Emissions (tonnes carbon dioxide equivalent – tCO2e) EPL+WPL PMR Messina* Total Scope 1: Emissions from direct fuel sources such as petrol and diesel 59,955 2,980 13 62,948 Scope 2: Emissions from purchased electricity 1,338,990 14,002 63,434 1,416,426 Scope 3: Emissions from other indirect sources such as purchased goods and services 31,369 970 1,200 33,539 *Not part of the WPL/EPL Mineral right or Operations but is reported as part of the total for ex Lonmin properties 230 Figure 93: Marikana* SO2 emissions 2017-2021/Q1 *Marikana accounts for all of the SO2 emissions from the SAPGM segment A comprehensive dust management plan has been developed and is implemented at Marikana (Lonmin, 2011). Marikana and neighbouring Sibanye-Stillwater mines operate a comprehensive ambient air quality monitoring network plan, including an extensive network of dust fallout buckets. Dust emissions are measured from selected monitoring points where and reported annually. During 2021, dust fallout levels were maintained at a compliance level 96% compliance level for the SA PGM operations. Compliance levels are measured in terms of the percentage of dust buckets that meet the compliance limits for residential and industrial sites as stipulated in the National Dust Control Regulations. Dust control and mitigation measures that include canon-spraying, watercart-spraying and application of chemical dust suppressants remain intact. Carbon Project The Afrigle System has been implemented at all the shafts in the Rustenburg and Kroondal Operations . Marikana has not implemented such a system as the shafts are largely conventional underground mining with limited trackless vehicle usage underground. 17.5.5 Biodiversity Management Since Sibanye-Stillwater took ownership of the Operations, there were no major infrastructure expansions that would have resulted in the loss of key biodiversity areas. Nevertheless, biodiversity management continues in terms of the following initiatives(Table 100): 231 • Update of Biodiversity Management and Action Plans associated specialist studies with specific focus on alien and invasive plant management; • Wetland delineations and health assessments, including impact assessments where new projects or project changes are planned to occur; • Surface water monitoring in terms quality, quantity and biological taxa composition; and For any new projects, the Environmental Impact Assessment and Basic Assessment processes are also implemented which incorporate the identification of important biodiversity areas such as wetlands, cave systems and ridges. Table 100: Biodiversity Priorities Unit Name Description Primary Impacts Conservation Worthy Unit Contains highest percentage of wetlands which should be functioning optimally and the associated a high faunal habitat potential. • Habitat fragmentation and loss • Disruption of water courses and • Introduction of alien invasive species. High Priority Unit Contains high faunal habitat potential. • Habitat fragmentation • Disturbance of fauna and • Introduction of alien invasive species. Medium Priority Unit Contains medium faunal habitat potential. • Disturbance of fauna • Changes in species composition and • Contamination of water courses and soil. Low Priority Contains low faunal habitat potential. • Loss of habitat • Introduction of alien invasive species and • Contamination of water courses and soil. Least Concern Too transformed or disturbed to currently provide any biodiversity value. • Loss of habitat • Introduction of alien invasive species and • Contamination of water courses and soil.
232 A South African Non-Profit Organisation, the Endangered Wildlife Trust (“EWT”), has taken the lead in South Africa in developing an international voluntary reporting mechanism, called the Biodiversity Disclosure Project, similar in approach to the Carbon Disclosure Project. Sibanye-Stillwater contributed to the final document, the Biological Diversity Protocol (“BDP”), and will be aiming to align with the reporting requirements in 2021. and has completed its first assessment of the BDP for its operations, and will be reporting on this in the 2021 Annual Integrated Report. The assessment includes hectare equivalency accounts for ecosystems and plots the planned changes over time in order to inform management and mitigation measures to achieve our target of a net gain in biodiversity as based on the ecosystem state at the date at which Sibanye-Stillwater took ownership of Kroondal. The assessment currently focuses on ecosystems and new mechanisms will be investigated in order to effectively assess species population data in a meaningful manner as current assessment measures are considered to be unviable (due to large areas and security considerations) and arbitrary (due to challenges in seasonality, specialist availability and geographical extent). Sibanye-Stillwater developed its first Biological Diversity Procedure that embeds the mitigation hierarchy into all decision-making processes from feasibility to post-mining. It ensures the use of the best practice local science-based methods for monitoring and assessment; the outcomes thereof are then incorporated into option analyses along with consideration of health, safety, engineering, social and economic considerations to arrive at the best practicable and sustainable way forward. Ultimately it aims to enhance avoidance of impacts on sensitive ecosystems and thereafter integrate mitigation, restoration and off-setting to achieve our net gain and no net loss targets as applicable to the sites. Managed by the EWT, the BDP will build the capacity of businesses to manage their biodiversity risks and opportunities and enable them to disclose their biodiversity performance in a standardised and comparable manner. 17.5.6 Water Use Strategy Sibanye-Stillwater recognizes water as a critical resource. The Company further considers its integrated approach to the management of our water footprint and our water systems infrastructure as a key component of its business strategy. The context summary of water use at Marikana for 2021 is presented in Figure 94. Marikana abstracted on average 33.03 Ml/day to process 31,752 tonne per day. 66% of this was purchased of Rand Water Board, supplied from the Vaal River System (VRS). 0.81 Ml/day was discharged at the Mooinooi Wastewater Treatment Works (WWTW) and 1.07 Ml/day was on-supplied to Kroondal. 233 Figure 94: Marikana Water Use Summary 17.5.6.1 Licensing The Marikana operations has an approved Water Use Licence (WUL) dated 22 February 2019, Licence No 01/A21K/ABCEFGIHJ/4620 and the Pandora Water Use Licence (WUL) dated 6 July 2017, Licence No 01/A21J/ACFGI/4913. Terms of the licenses are standard conditions typical of similar operations in South Africa. 17.5.6.2 Geohydrological Analysis and Pumping Ground Water Two main aquifers exist in the Bushveld Complex area: • A shallow aquifer, which lies within the weathered and fractured zone and • A deep aquifer, which has developed in through secondary fracture and fault zones. These two are discussed separately and in more detail in the following sections. Most of these studies were conducted more than 10 years ago information on laboratories, testing and analyses were not reported and the information is not available to the QPs. Shallow Aquifer The water level of this aquifer is often shallow and may daylight as springs occasionally when intersected by barriers such as topography, dykes and basement highs in valleys and topographic lows/depressions. This aquifer is important as it often acts as a pathway for contaminants migrating from surface (anthropological) activities to surface water bodies such as rivers / dams / streams. Deep Aquifer The groundwater flow occurrence within the area of the site is contained in intergranular interstices and fractures (with expected yields ranging from 0.5 – 2.0 l/sec to 2.0 – 5.0 l/sec) within the rock mass. 234 The aquifer associated with these geological units is classified as a minor aquifer system with a low vulnerability of groundwater contamination, variable groundwater quality and a negligible permeability for groundwater flow. Dolerite and/or granite intrusions usually act as an aquitard and compartmentalise the groundwater regime. Highly conductive groundwater flow paths are expected at intersections of fracture zones or in transition / contact zones between the host rock and the intrusions. The faulted and fractured contact zones interconnect the strata, both vertically and horizontally into a highly heterogeneous and anisotropic unit. Hydraulic Properties The groundwater levels follow topography. The drawdown of groundwater levels around the open pit areas are localised and the impact is considered low. Average hydraulic conductivity values for the area are presented in Table 101. Table 101: Average Hydraulic Conductivity Levels Aquifer Average hydraulic conductivity ranges [metres/day] [metres/sec] Weathered listed in 1.3 1.5E-05 Alluvial 3 3.5E-05 Bushveld Complex 0.003 – 0.05 3E-08 – 6E-07 Transvaal rocks 0.015 – 0.03 2E-07 – 4E-07 Regional faults 0.05 – 0.1 6E-07 - 2E-06 - Groundwater direct recharge from rainfall, with an estimated regional recharge rate of 2.5% of a mean annual precipitation of 635mm or 16mm/annum. A higher rate of 22mm/annum was assigned to the backfilled pits (to account for the higher porosity and infiltration capacity of the backfill material). Pumping Strategy Shafts are equipped with water handling infrastructure to: • Supply workings with required water; • Treatment and recycling of water to minimise top-up requirements; and • Pump systems to enable water re-cycling and removal of excess fissure water to ensure safe workings. Some of the shafts on care-and-maintenance is used primarily for the removal of excess fissure water to ensure safe workings. Excess water is directed to other process users such as concentrators. The water handling infrastructure is operated and maintained in accordance with engineering standards and procedures. 235 17.5.6.3 Surface Water Resources Sources and Wetlands Catchment Area Marikana is located within the Limpopo Catchment Management Area (WMA), within the A21K and A21J quaternary catchment areas. In the west, two perennial rivers/streams, namely Sterkstroom and Maretlwane form tributaries of the Gwatlhe, also a tributary of the Crocodile River, which is located 26 km north of the site area. In the east, the perennial Kareespruit forms a direct tributary of the Crocodile River. All of the tributaries flow in a northerly direction (toward the Crocodile River). The drainage is controlled entirely by the presence of the Kareepoortberg, which forms a local watershed divide between the Sterkstroom and Crocodile Rivers that feed into the Rooikoppies Dam. Refer to Figure 95 for the locality of the Quaternary Catchment Area. Figure 95: Quaternary Catchment Area The general flow direction is towards the major drainages. The groundwater flow from the western and central areas (Karee and WPL TSFs) is towards the north-east and the groundwater flow on the western side towards the west or north west.
236 The main potential sources that may contribute to both surface and groundwater contamination are presented in Figure 96. Figure 96: Potential sources of surface and groundwater contamination located on site and current operational status. 17.5.6.4 Discharge The quality of all the discharged water, surface and ground water at monitoring points are measured on predetermined frequencies and the results are submitted to the DWS as required in the WUL. Monitoring points are given in Section 17.5.6.6, Figure 97. With the exception of Mooinooi treated water effluent being discharged, all water on the mining operations is kept in a closed water reticulation and therefore, no other discharges are experienced on a continuous basis. However, from time to time, the operations may experience a dam overflow due to heavy rainfall in the summer periods. Our strategy is to minimise or eliminate any uncontrolled discharges through our storm water management systems and optimising dam capacity management. 237 17.5.6.5 Usage and Storage The Marikana underground and open pit mining of the Merensky and UG2 reefs occur at various shafts and open pits. Marikana Operations Hossy-, Newman-, Saffy-, E3-, E2- and E1 shafts are located in the Eastern section of Marikana with E1, Newman, Hossy on care and maintenance at present. Rowland-, West 1- and B3 Shafts are located in the Western Section, of which Rowland and West 1 are on care and maintenance, and 4 Belt-, 2F, K3 and K4 Shafts in the Karee Section of the Marikana Operations, with K4 in execution phase. The U2 open pit is located at the Karee Section and M10 Open Pit at the Eastern Section of the Marikana Operations. Both of these pits are not being mined anymore and options for rehabilitation are being evaluated. The Marikana Complex further comprises of the EPC- and EPL concentrators in the Eastern section, the UG2 concentrator (Also called BTT) and BMR smelter in the Western section and the K3- and K4 Concentrators in the Karee section - all major water consumers. The Bulk Tailings Treatment (BTT) surface mining operation situated in the Eastern section, represents another significant water consumer. Five active Tailings Storage Facilities (TSF’s) receive tailings deposits from the various concentrator plants. Three TSF’s (KTD2, KTD3 and KTD4) are located in the Karee section, one (TD6) in the Western section and one (EPL/EPC TD) in the Eastern section. Tailings Dam 5 in the Western section are not active and only receives rainfall runoff. Various villages and hostels are located in the Karee-, Western- and Eastern sections of the Marikana Complex. Potable water consumption by hostels and Marikana receives raw water from various sources water sources listed in Table 102. The mine is licenced to abstract and use this water as per the approved Water Use Licence (Ref: 01/A21K/ABCEFGIHJ/4620) Table 102: Raw Water Supply Sources Used for Mining Purposes Raw Water Supply Sources Licensed Volume (01/A21K/ABCDEFGIJ/4620 – 22 Feb 2019) Buffelspoort Dam (via irrigation canal) 927,500 m3/a Hartbeespoort Dam (via irrigation canal) 255,440 m3/a Crocodile River 3,650,000 m3/a Total 4,832,940 m3/a The following raw water sources of water are licenced to the Operations but are still agricultural volumes and have not been converted for mining purposes: 238 Table 103: Agricultural Water Supply Sources not used for mining purposes Raw Water Supply Sources Licensed Volume (01/A21K/ABCDEFGIJ/4620 – 22 February 2019) Buffelspoort Dam (Rooikoppies) 755,250 m3/a Buffelspoort Dam (Zwartkoppies) 321,710 m3/a Buffelspoort Dam (Middelkraal) 497,240 m3/a Buffelspoort Dam (Kaffirskraal) 98,580 m3/a Total 1,672,780 m3/a Potable water in the order of 23 million litres per day is purchased from the Rand Water Board network which draws water from the Vaal River System. Other sources of water that supplement the water balance include: • Fissure water that collects in the underground and is removed for safety purposes and • On site anthropogenic aquifers (backfilled areas). Water security is increased on site through the backfilling of previously mined open pit areas and using these as anthropogenic aquifers and the storage of water in-pit i.e., UG2 Pit. 17.5.6.6 Water Monitoring Groundwater Monitoring Network There is a total of 235 actively monitored boreholes on site which are sampled and analysed by an external services provider. A total of 220 boreholes are monitored on a quarterly basis, whilst 5 boreholes are included in the monthly monitoring programme and 10 bi-annually. The groundwater monitoring network supporting the Operations are indicated Figure 97. 239 Figure 97: Groundwater Monitoring Network Supporting the Marikana Operations 17.5.6.7 Water Conservation and Demand Management (WCDM) Sibanye-Stillwater listed the following strategic objectives as Water Conservation and Water Demand Management focus areas: Objective 1: Demonstrating thought leadership in WCWDM practices; Our WCWDM plan presents a strategy and specific initiatives that aims to drive industry leading performance when it comes to responsible water management practices. Our aim is to align our strategy and initiatives to regional, national and global strategies, where each initiative is implemented after thoroughly considering and aligning to all relevant social, environmental and governance requirements. Objective 2: Drive business sustainability through ensuring availability of water to support safe and productive operations – water security and water independence;
240 Objective 3: Minimise the impact of our operations on water resources; • Achieve this through: • Responsible and efficient use of water; • Minimise uncontrolled and unlicensed discharge of water; and • Minimise pollution of water. Our plan is to improve the recovery of water from large facilities such as Tailings Storage Facilities (TSF’s) and rock dumps. It also consists of monitoring regimes used to identify and minimise water leakages and excessive use. We drive initiatives required to improve water storage and the control of process dams for each operation. Water polluted with fuels, oils, greases, heavy metals, salts and other possible pollutants are not fit for operational or potable use. It is not permitted to discharge water polluted beyond specified limits. Therefor pollution must be kept to a minimum. Our strategy aims to optimise the re-cycling of effluent water. Objective 4: Drive business sustainability through continuous improvement, effective governance and meaningful stakeholder engagement to promote WCWDM; Each initiative in the WCWDM plan carefully considers business sustainability, such as risk and cost, and is evaluated, designed and implemented within defined governance framework and procedures. A comprehensive Legislated Environmental Activity Procedure (LEAP) ensures that affected stakeholders are consulted and considered in the implementation of projects. The aim of Sibanye-Stillwater is to embed a culture of responsible water use among our employees and stakeholders. Objective 5: Drive sustainable mine closure strategies Given the priority of sustainable post mining economies, the management of water resources to benefit the region post-closure is important. Our aim is to implement closure strategies that considers the opportunities and risks associated with water resources available for future communities and economies. The following Water Conservation and Demand Management practices are implemented on site through a continual improvement process (Table 104): Table 104: Water Conservation and Demand Management Practices Description Aspect Possible Actions General Areas Management of Consumption Flow gauges for main consumers. Complete and active water balance. Analysis of historical consumption records and its relation to production levels to determine the plant’s real water requirements. Best practices related to extraction, transportation, storage and distribution of the Correctly assess and plan associated installations, considering the capacity and potential for breakage, the probability and frequency of flows that go against its design and the impact of an emergency on the water resource, both inside and outside the mine. 241 Description Aspect Possible Actions water resource Maintenance Carry out proper preventive maintenance for the installations. Management of leaks Install mechanisms for the timely detection of leaks in process water lines. Management of water loss Check water losses in the different lines. Correct detected problems and conduct a feasibility study regarding the implementation of possible improvements. Open Cast Areas Water Use for dust control Optimize road watering, where applicable. Asphalt surfaces on main access roads. Prevention of storm water ingress Installation of clean water diversion berms diverting uncontaminated storm water away from the pit area. Plant Areas Workshop Area Use of high pressure low volume systems. Measurement of use Proper instruments to measure water volumes on-line of inputs and outputs of unit processes. Management of losses Use valves to interrupt supply aimed at avoiding water losses in the case of emergencies. Monitoring and Reporting Specify objectives and goals, monitor indicators, and follow up. Include variables that correspond to the quality of the resource as well as the discharge of effluents. Process Water Dams Measurement of re- use Proper instruments to measure water volumes on-line of inputs and outputs of unit processes. Monitoring and Reporting Specify objectives and goals, monitor indicators, and follow up. Include variables that correspond to the quality of the resource as well as the discharge of effluents. Raw Water Dams Measurement of Abstraction Proper instruments as to measure the volumes of water abstracted – online and calibrated. Monitoring and Reporting Specify objectives and goals, monitor indicators, and follow up. Include variables that correspond to the quality of the resource. Monitoring and Reporting Specify objectives and goals, monitor indicators, and follow up. Include variables that correspond to the quality of the resource. Tailings Storage Facilities Design Improve design to obtain a higher level of water recovery since the biggest losses in dams are from evaporation, infiltration, and retention. Best technology Install tailing thickeners to increase concentration in tailing pulp weight to be transported Reduce seepage losses Appropriate Liners. Storage supervision Supervision at the pool level regarding solutions to avoid spills, infiltrations, and water losses. Maximise re-use of water Decant water to a lined return water dam allowing maximum re-use in process. Prevention of storm water ingress Installation of clean water diversion berms diverting uncontaminated storm water away from the facility. Monitoring and reporting Specify objectives and goals, monitor indicators and follow up. Include variables that correspond to the quality of the resource. 242 Description Aspect Possible Actions Waste Rock Dumps Removal over time Re-working and removing of the waste rock stockpiles. Rehabilitate the area impacted. 17.5.7 Waste Management Marikana generates waste resulting from the direct mining operations (i.e. waste rock dumps, tailings, slag – MRD) as well as a secondary waste stream which relates to waste water treatment plants, business waste, domestic waste and health care waste (medical waste). The waste stream at Marikana ranges from general to hazardous wastes, for which management measures/plans/procedures are in place. The waste currently generated includes domestic waste (paper, glass, metals, plastic, and food waste), hazardous waste such as contaminated oil waste such as rags, soil, filters, etc., and health care waste. In 2020, the creation of an internal waste data capturing system to all the SA operations was pursued, to ensure uniformity of waste data collection across the operations and to record waste information on type and quantity of waste recovery, its reuse, recycling, treatment and disposal at each operation. This has coincided with the development and update of waste inventories. This information will be used as a basis to understand the life-cycle of our waste streams and will be used to inform the development of waste disposal to landfill diversion target. Approval was obtained from the Department of Water and Sanitation (DWS) and the North West Department of Economic Development, Environment, Conservation and Tourism (DEDECT) on the extension constructed at the Mooinooi Landfill site located at the Marikana operation. Over R20 million was spent on the first phase of the extension, ensuring an additional 15 years of airspace for the operations and the surrounding communities. To meet the zero-waste-to landfill goal, Sibanye-Stillwater generally has commenced with the implementation of a number of waste minimisation initiatives: • A pilot project at our smelter operations (Marikana) to convert the calcium sulphite waste stream into gypsum via a treatment oxidation process. • With the introduction of technology advancements towards the end of 2019, reduction of between 10-15% of quantity and the lowering of salt levels of this waste to landfill was achieved • Complete diversion of the acidic and alkaline liquid waste streams at the Precious Metals Refinery (PMR- Marikana) through recovery and treatment technologies. Diversion is currently, on average, 2,200t/month of hazardous waste from landfill • To segregate, recycle and reuse large quantities of our industrial and hazardous waste streams at our operations, as well as smaller portions of our general domestic waste stream. At the moment approximately 44% of general waste is recycled or reused at the SA operations • The tyres we purchase contain 15% reused fill material, which increases the demand for reusable fill material 243 17.5.8 Environmental Reporting To ensure continued compliance to the various licenses in place for the Operation, numerous audits are performed on varying timelines, based on the regulatory, as well as practical management requirements associated with the relevant authorization. The environmental monitoring and reporting requirements are summarised in Table 105. Environmental Authorizations are given in Table 106. Table 105: Environmental Monitoring and Reporting Periods Impacts Monitoring period Reporting period Responsible Government Department Topography On-going Ad hoc DMRE, NW DEDECT Soils On-going Ad hoc investigations regarding incidents, spills. DMRE, NW DEDECT, Dept of Agriculture Land capability On-going Ad hoc DMRE, NW DEDECT Natural vegetation On-going Ad hoc DMRE, NW DEDECT Animal life On-going Ad hoc DMRE, NW DEDECT Visual aspects On-going Only if significant impact is proposed, in which case an environmental assessment may need to be completed DMRE, NW DEDECT Archaeological, Historical and cultural sites On-going Ad hoc SAHRA, DMRE, DEA, NW DEDECT Sensitive landscapes On-going Only if significant impact is proposed, in which case an environmental assessment may need to be completed DMRE, NW DEDECT Safety Risks and Hazards On-going When required DMRE (Mine Health & Safety) Noise Outside mining area (boundary) Baseline and Ad- hoc in response to complaints. When required DMRE, NW DEDECT Water Quality and Quantity Surface water Monthly Annually DWS Ground water As per WUL Requirements Annually DWS Toxicity and Biomonitoring Requirements Bi-annual Annually DWS Storm water Monthly Annually DWS Legal compliance reporting regarding Water Quality and Use. Annual Annually DWS Level 3> incidents. On-going Ad-Hoc DWS Air Quality (and compliance reporting i.t.o NEMQA, 2004) Dust fallout Monthly Annually DMRE, NW DEDECT Emissions As per Atmospheric Emission License requirements As per Atmospheric Emission License requirements NW DEDECT, Bojanala District Municipality
244 Impacts Monitoring period Reporting period Responsible Government Department Legal compliance reporting i.t.o the MPRDA (2002) EMPr Performance Assessments On-going Bi-ennial DMRE Report on Tailings Dam Emission Management On-going Annually DMRE Annual Financial Provision and Closure Costing Update. Annual Annually DMRE Environmental Scorecard: Mining Charter Annual Annually DMRE Legal Compliance reporting i.t.o National Environmental Management Waste Act, 2008 Legal compliance and performance with existing waste licenses and permits. Annual Annually DEA/DMRE Waste information Systems Annual Annually DEA/DMRE Norms and Standards Internal and External Audits On-going Internal – Biannual External – Biennial DEA/DMRE Table 106: Environmental Authorizations Status 2021 Area/Licence Type of licence New/Amendment Status Marikana Operations (2019) Water Use License Amendment(to 2019 WUL) Approved WPL Env. Mgmt. Prog.(EMPr) Amendment Approved BTTP Pipelines Basic Assessment Amendment Approved Hossy Temporary Hazardous waste storage Waste mgmt License Amendment Approved General Landfill site expansion Waste mgmt License Amendment Complete Exemption from EIA Regulations for upgrading and construction of new recreational and training facilities Exemption Amendment Complete Tailings Dam 8 EIA/EMPR amendment Amendment Complete Smelter Oxidation Plant Waste mgmt License New To be initiated Smelter Oxidation Plant Bulk Chemicals EA New and Amendment To be initiated EPL SWD EA New In progress Smelter (2021) Atmospheric Emission License Renewal Received Assay Lab (2021) Atmospheric Emission License Renewal Received BMR (2021) Atmospheric Emission License Renewal In Progress 245 17.5.9 Closure Planning and Costs The Operations are committed to on-going closure planning. Scheduled and unscheduled mine closure costs are reviewed and updated annually for financial reporting and regulatory compliance. The National Environmental Management Act (NEMA), pertains to the financial provision for prospecting, exploration and mining and requires that a final rehabilitation, decommission and mine closure plan is developed which includes the determination of financial provision to guarantee the availability of sufficient funds to undertake rehabilitation and remediation of the adverse environmental impacts of mining. An amendment to GNR 1147 ( Regulations for Financial Provision for Prospecting, Exploration, Mining and Production Operations,2015) in October 2016, extended the Transitional Arrangements to February 2019 (which was subsequently further extended to February 2020 and again to June 2022). The alignment of these plans and documents to the 2015 FP Regulations is ongoing. Compliance with the Financial Provisioning Regulations is required within three months from the first financial year-end following June 2022, which is the new promulgated compliance date for the amended FP Regulations. Therefore Sibanye-Stillwater Marikana Operations is required to be compliant by March 2023. In order to ensure that all aspects potentially applicable during the closing of a facility is considered during the quantum assessment, a standard checklist have been provided by the guidelines which was used in compilation of this plan. It is however recognized that all the items will not always be applicable for all the areas, but it was considered in any event to make sure that all possible issues were addressed and assessed. Closure Components to be considered during the Quantum Assessment are given in Table 107. In addition, Long Term Care and Maintenance plans as well as Future Monitoring programmes will be established as part of the Closure Plans. 246 Table 107: Closure Components Component No. Description 1 Infrastructural Areas 1.1 Dismantling of processing plant and related structures (including overland conveyers and powerlines) 1.2 Demolition of steel buildings and structures 1.3 Demolition of other buildings and structures 1.4 Rehabilitation of roads and paved surfaces 1.5 Demolition and rehabilitation of railway lines 1.6 Other linear infrastructure 1.7 Disposal of demolition waste 1.8 Making good of infrastructure 2 Mining Areas 2.1 Open pit rehabilitation, including final voids and ramps 2.2. Sealing of shafts, adits and inclines 2.3 Rehabilitation of stockpiles and processing residues 2.4 Rehabilitation of clean water impoundments 2.5 Rehabilitation of dirty water impoundments 3 General surface rehabilitation 3.1 Infrastructural areas 3.2 Other surface disturbances 4 Runoff Managemenr 4.1 River diversions and watercourse reinstatement 4.2 Reinstatement of drainage lines 5 P&Gs, Contingencies and additional allowances 6 Pre-site relinquishment monitoring and aftercare 17.5.9.1 Life of Mine Planning and closure The operating shafts, including Saffy, Rowland, K3, 4B and E3 Shafts are still highly productive and remain far from closure. The care and maintenance shaft complexes include Hossy Shaft, Newman Shaft, W1 Shaft, E1 and E2 Shafts. K4 Shaft was reopened in2021 and is execution stage. Six concentrators are still operational, namely K3 UG2 and Merensky, K4, Eastern Platinum Concentrators, BTTTP and EBTTP. Rowland, Merensky and the main plant of EPC Concentrator has been placed on care and maintenance, with the Tailings Treatment Plant at EPC Concentrator still in operation and now falling under the Eastern Platinum Concentrator complex. With the exception of the U2 open pit, all open pits have been mined-out and have been rehabilitated with the exception of the M9 and M10 pits. Moderate rehabilitation and maintenance needs to be undertaken at some of the 247 rehabilitated open pits as identified in the annual audits undertaken of these areas. Corrective actions have been identified to address any concerns identified on site. EPL Tailings Dam 2, Western Platinum Tailings Dam 6, Karee Tailings Dams 2, 3 and 4 are still operational, with Western Platinum Tailings Dam 3,4,5 complex being used as an emergency dam. One TSF is currently being reprocessed (EPL TD1), through the EBTTP and BTTP tailings treatment plants and WPL TD2 is being re-mined to obtain materials for use in the grout plants for underground support. The planned TSF (TD8) will no longer be constructed alternative options are being investigated. Previous versions of the LOM indicate that the Marikana Operations will be operational for at least another 50 years at the budgeted mining rate based on current Mineral Reserves.). A proposed closure schedule compiled in 2015 is given in Figure 98. Figure 98: Life of Mine Planning (2015) The envisaged final land uses at the cessation of mining are shown in Figure 99 and Figure 100. The land use mix consists of industrial areas (including small- and large-scale mining and other industries), residential areas, wilderness, subsistence agriculture, intensive agriculture, as well as corridors for ecological goods and services (biodiversity, open spaces, and green corridors).
248 Figure 99: Graphical indication of the envisaged suite of land uses and/or cover types. 249 Figure 100: Potential Land Uses Post Closure 17.5.9.2 Unscheduled Closure Cost Estimate Marikana total closure liability and associated financial provision is based on unplanned closure, with specific costs allocated to the demolition of mining and associated infrastructure, the rehabilitation of mine-impacted land and post-closure monitoring and maintenance. The mechanisms and methods of the demolition, remediation and rehabilitation processes are described in rehabilitation and final closure plans. A closure cost estimate for an unscheduled closure at the Kroondal Operations is updated annually, in line with the International Financial Reporting Standards (“IFRS”) of the International Accounting Standards Board and South African Statements of Generally Accepted Accounting Practice as well as applicable environmental legislation (MPRDA and NEMA) and in accordance with the Draft GN1147. The closure cost assessment included an update and escalation of the unit rates applied in the C2020 update, and the inclusion of additional construction and removal of existing infrastructure since the previous closure cost update. The base rates applied in the closure cost assessment were determined as at March 2021. The 2021 unit rates remained largely unchanged from the 2020 rates, and similar to 2019, primarily due to COVID-19 restrictions and the resultant impacts on escalations. 250 The updated closure cost estimates for unscheduled closure as at 31 December 2021 amount to ZAR2.489 billion for the Marikana Operations. No financial discounting has been applied. The 2021 closure liability will be funded through financial guarantees. The detailed breakdown of the 2020 unscheduled closure estimate is as follow: • Infrastructural and mining aspects – ZAR 1,766,544,181 (71%) • Pre-site Relinquishment Monitoring & Aftercare – ZAR 47,135,776 (2%) • Residual Closure Costs – ZAR 306,930,167 (12%) • Combined Preliminary & General and Contingencies – ZAR 282,647,069 (11%) • Additional studies & allowances – ZAR 86 354 296 (3%) 17.6 QP Opinion The QP is satisfied that all material issues relating to Environmental, Social and Governance have been considered in Marikana’s planning. All relevant issues are being addressed, have plans in place to remedy any deficiencies or have been identified for further consideration. The QP is satisfied that all material issues relating to Environmental, Social and Governance have been addressed in this document. 18 Capital and Operating Costs 18.1 Overview The following sections contain summaries of the Capital and Operations cost projections. Projections are compared to the last three years actual figures. Accuracy limits for metal pricing and costs is given in Table 124 in Section 21.1.2. Risks are discussed in Section 21. 18.2 Capital Costs Capital expenditure for Marikana Operations includes development capital for the K4 project and sustaining capital for all the operations (Refer to Table 108 and Table 109 ). Ongoing capital expenditure estimates are based on a provision of an approximate 4% of operating cost expenditures, and are generally excluded for the first year in the LoM plan. These amounts cater for unforeseen expenditures and are considered prudent provisions(contingencies), given that limited detail is provided beyond the current three-year horizon. There are no new capital projects planned. 251 Table 108: Historical and Forecast Capital Expenditure – Current Operations Historical Real Forecast Units C2019 C2020 C2021 LoM C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 C2030 C2031 C2032- 2036 Total 1 2 3 4 5 6 7 8 9 10 11-15 Sustaining Capital (ZARm) 623 515 1,307 14,634 2,228 1,330 973 910 734 631 694 514 456 412 1,232 Table 109: Historical and Forecast Capital Expenditure – Current Operations Real Forecast Units C2037- 2041 C2042- 2046 C2047- 2051 C2052- 2056 C2057- 2061 C2062- 2066 C2067- 2071 C2072 16 - 20 21 - 25 26 - 30 31 - 35 36 - 40 41 - 45 46 - 50 51 Sustaining Capital (ZARm) 834 815 683 695 690 637 166
252 18.3 Operating Costs This section provides details on the forecast operating cost estimates for Marikana Operations. 18.3.1 Operating Costs by Activity Table 110 provides details of historical and forecast Operating Costs by activity grouped according to: • Mining costs – underground mining costs and surface sources costs, including ore handling costs • Processing costs, including tailings and waste disposal costs and • The cost of maintaining key on mine infrastructure. In addition, Marikana has incorporated costs for environmental rehabilitation and closure and costs associated with terminal benefits, which will be payable on cessation of mining activities. No salvage values have been assumed for the plant and equipment. The Operating cost are based on the current year’s operational business plan and projected forward using the required production profile taking into account the likely physical changes in the operating parameters over the full period of the LoM plan. 18.3.2 Operating Costs Operating cost for the Mineral Reserves in the LoM plan is ZAR 1,841/tonne. The actual operating cost for C2021 was ZAR 1,571/t for underground and surface combined (Refer to Table 110and Table 111). The five-year forecast average is ZAR1,700/t. 18.3.3 Surface Sources Costs The Surfaces Sources and purchase of concentrate in the Mineral Resource or LoM plan are included in the total operating cost. 18.3.4 Processing Costs The treatment cost for C2021 is estimated at R275/t for both underground and surface material. The LoM, the expected unit costs increase as the production plan decreases. The average in the next five years is ZAR319/ton. 18.3.5 Allocated Costs Allocated costs have been forecast at an average of ZAR2,795 million per annum in the next five years. These costs include costs for rehabilitation, Royalties, Retrenchment cost, Engineering, Occupational Environment and Hygiene, Environmental Management, Health and Safety, and other typical centralized costs. 253 Table 110: Historical and Forecast Operating Costs -Current Operations Historical Real Forecast Units 2019 2020 2021 LoM 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total 1 2 3 4 5 6 7 8 9 10 Operating Cost (ZARm) 8,719 14,205 16,759 329,197 16,117 16,903 17,530 15,487 15,152, 14,576 14,191 13,871 13,589 10,474 Tonnes Milled (Kt) 6,793 9,056 10,671 178,796 11,253 11,434 11,405 7,556 7,339 6,985 6,796 6,702 6,525 5,414 Operating Cost (ZAR/t) 1,283 1,56 1,57 1,841, 1,432 1,478 1,537 2,05 2,065 2,087 2,088 2,070 2,083 1,935 Table 111: Historical and Forecast Operating Costs -Current Operations Real Forecast Units C2032 - C2036 11 - 15 C2037 - C2041 16 - 20 C2042 - C2046 21 - 25 C2047 - C2051 26 - 30 C2052 - C2056 31 - 35 C2057 - C2061 36 - 40 C2062 - C2066 41 - 45 C2067 - C2071 46 - 50 C2072 51 Operating Cost (ZARm) 39,465 24,58 20,340 20,598 20,899 20,593 19,155 15,673 0 Tonnes Milled (Kt) 20,044 13,152 11,551 11,469 11,683 11,560 10,305 7,623 0 Operating Cost (ZAR/t) 1,969 1,869 1,761 1,796 1,789 1,781 1,859 2,056 0 254 19 Economic Analysis 19.1 Introduction The following section presents a discussion and comment on the economic assessment of Marikana Operations. Specifically, comment is included on the methodology used to generate the financial models for Marikana Operations to establish a base case, including the basis of the techno-economic model, modelling techniques and evaluation results. Economic analysis and the through put tonnages are 100% of the Mineral Reserve. Mineral Reserves are Attributable to Sibanye-Stillwater at 80.64%. 19.2 Economic Analysis Approach Marikana can be classified as a Production Property as it has significant, detailed cost and capital information specific to the geographic and economic locality of its assets. The cash-flow approach is the most appropriate method to use for the economic analysis. There is no appropriate secondary analysis approach. 19.3 Economic Analysis Basis The assumptions on which the economic analysis, for current operations and K4 Project, is based include: • All assumptions are in 31 December 2021 money terms, which is consistent with the Mineral Reserve declaration date • Royalties on revenue are consistent with relevant South African legislation (0.5 - 7.0% based on formula) (refer to Table 112) • Corporate taxes that can be offset against assessed losses and capital expenditure (refer to Table 112) • A Real base case Discount Rate of 5% and • Discounted cash-flow (DCF) techniques applied to post-tax pre-finance cash. Sensitivity analysis was performed to ascertain the effect of discount factors, product prices, total cash costs and capital expenditures. The post-tax pre-finance cash flows presented for the mining asset incorporate the macroeconomic projections set out in Table 113. • The Technical – Economic Model (TEM) is presented in real terms are based on annual cash-flow projections determined at end-point 31 December 2021. 255 19.4 TEM Parameters Table 112 provides details of the parameters applied in the TEM. Table 112: TEM Parameters Parameter Units Current Ops Historical Corporate Tax Rate (%) 27% Royalties (based on the formula) (%) 0.5% - 12.5% Trading Terms Debtors (Days) 3 Creditors (Days) 45 Stores (Days) 45 Balance at 31 December 2021 Debtors (ZARm) 8 338 Creditors (ZARm) 3 972 Stores - opening balances (ZARm) 622 Unredeemed Capital - 31 December (ZARm) Environmental Closure Liability – 31December (ZARm) 1 361 Terminal Benefits Liability Based On LoM (ZARm) 1 477 Assessed Losses (Years) NA The following working capital parameters have been applied in the model: Debtors – 3 days; Creditors – 45 days; and Stores – 45 days. Sibanye-Stillwater has indicated that the balances for working capital will be settled at the effective date of the Mineral Reserve declaration, and as such the opening balances have been set to zero. The corporate tax rate applied is based on a formula that uses capital expenditure and assessed tax losses. Royalties are calculated using the formula for refined metals [Royalty Payable = 0.5+ (EBIT/Gross Sales)/12.5]. 19.5 Technical Economic Model The technical inputs used to determine the financial parameters for the TEMs are provided in Table 113 to Table 116, as well as an assessment of the financial parameters on a unit cost basis: ZAR/4Eoz.
256 Table 113: TEM – Mining, Processing, PGM’s Sold and Revenue, Cash Costs, Taxation, Capital Expenditure and Free Cash – 2022-2031 LoM C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 C2030 C2031 Units Total 1 2 3 4 5 6 7 8 9 10 Underground Mining Development (m) 1,120,953 98,029 90,930 77,203 61,236 55,607 50,051 41,418 36,370 34,219 30,979 ROM (kt) 168,345 7,525 7,752 8,364 7,556 7,339 6,985 6,796 6,702 6,525 5,414 Head Grade (g/t) 4.07 3.84 3.88 3.95 4.02 4.04 4.05 4.08 4.11 4.15 4.14 Recoveries (%) 86.2% 84.8% 84.7% 84.6% 84.6% 84.7% 84.8% 84.9% 85.1% 85.1% 85.3% PGM Ounces (4E0z'000) 18,998 787 818 898 826 807 772 757 754 741 614 Recovered Grade (g/t) 3.51 3.25 3.28 3.34 3.40 3.42 3.44 3.46 3.50 3.53 3.53 Surface ROM (kt) 10,451 3,728 3,681 3,041 0 0 0 0 0 0 0 Head Grade (g/t) 0.91 0.88 0.90 0.96 0.00 0.00 0 0 0 0 0 Recoveries (%) 25.6% 25.6% 25.6% 25.6% 0.0% 0.0% 0 0 0 0 0 PGM Ounces (4E0z'000) 78 27 27 24 0 0 0 0 0 0 0 Recovered Grade (g/t) 0.23 0.23 0.23 0.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Processing Ore Processing (kt) 178,796 11,253 11,434 11,405 7,556 7,339 6,985 6,796 6,702 6,525 5,414 Head Grade (g/t) 3.89 2.86 2.92 3.15 4.02 4.04 4.05 4.08 4.11 4.15 4.14 Recoveries (%) 85.4% 78.7% 78.8% 79.8% 84.6% 84.7% 84.8% 84.9% 85.1% 85.1% 85.3% Recovered Grade (g/t) 3.32 225.1% 229.9% 251.6% 340.2% 341.9% 343.6% 346.3% 349.9% 353.2% 352.9% PGM Produced (4Eoz) 19,076 814 845 922 826 807 772 757 754 741 614 Basket Price Basket Price (R/4Eoz) 26,986 27,936 27,972 27,793 27,804 27,992 28,065 28,060 27,914 27,812 27,543 257 LoM C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 C2030 C2031 Units Total 1 2 3 4 5 6 7 8 9 10 Revenue 4E Revenue (ZARm) 506,505 23,469 25,418 26,682 22,759 21,958 21,057 20,647 20,462 20,038 16,451 Other Metals (ZARm) 31,365 1,729 1,721 1,791 1,523 1,490 1,423 1,394 1,365 1,325 1,055 Base Metals (ZARm) 21,202 1,103 1,197 1,271 1,003 885 824 797 803 802 617 Revenue from sales of mining products (ZARm) 559,072 26,301 28,336 29,745 25,285 24,334 23,303 22,839 22,631 22,165 18,123 Operating Cost Direct Operations Cost (ZARm) 329,197 16,117 16,903 17,530 15,487 15,152 14,576 14,191 13,871 13,589 10,474 RBN Royalties (ZARm) 0 0 0 0 0 0 0 0 0 0 0 Terminal benefits costs (ZARm) 1,477 0 0 235 0 0 0 0 0 470 0 Environmental closure cost (ZARm) 995 0 0 0 14 0 0 0 0 0 114 Royalty payable (ZARm) 2,795 132 142 149 126 122 117 114 113 111 91 Recurring pre-tax income from continuing operations (EBITDA) (ZARm) 224,608 10,052 11,291 11,831 9,658 9,060 8,610 8,533 8,646 7,996 7,444 Taxation (ZARm) 43,086 2,112 2,689 2,932 2,362 2,248 2,154 2,117 2,196 2,036 1,899 Net Income from continuing operations (ZARm) 181,522 7,940 8,602 8,899 7,296 6,812 6,456 6,417 6,451 5,960 5,546 Capital Expenditure (ZARm) 14,634 2,228 1,330 973 910 734 631 694 514 456 412 Net Free cash (ZARm) 166,888 5,711 7,272 7,926 6,386 6,078 5,825 5,723 5,937 5,504 5,133 258 Table 114: TEM – Mining, Processing, PGM’s Sold and Revenue, Cash Costs, Taxation, Capital Expenditure and Free Cash – 2033-2071 LoM C2032 - C2036 C2037 - C2041 C2042 - C2046 C2047 - C2051 C2052 - C2056 C2057 - C2061 C2062 - C2066 C2067 - C2071 C2072 Units Total 11 - 15 16 - 20 21 - 25 26 - 30 31 - 35 36 - 40 41 - 45 46 - 50 51 Underground Mining Development (m) 1,120,953 121,160 81,158 75,943 73,721 75,038 62,024 41,924 13,945 0 ROM (kt) 168,345 20,044 13,152 11,551 11,469 11,683 11,560 10,305 7,623 0 Head Grade (g/t) 4.07 4.12 4.05 3.80 3.73 3.91 4.11 4.55 4.92 0.00 Recoveries (%) 86.2% 85.2% 86.9% 88.0% 88.0% 88.0% 88.0% 88.0% 88.0% 0.0% PGM Ounces (4E0z'000) 18,998 2,261 1,486 1,243 1,211 1,292 1,345 1,326 1,060 0 Recovered Grade (g/t) 3.51 3.51 3.51 3.35 3.28 3.44 3.62 4.00 4.33 0.00 Surface ROM (kt) 10,451 0 0 0 0 0 0 0 0 0 Head Grade (g/t) 0.91 0 0 0 0 0 0 0 0 0 Recoveries (%) 25.6% 0 0 0 0 0 0 0 0 0 PGM Ounces (4E0z'000) 78 0 0 0 0 0 0 0 0 0 Recovered Grade (g/t) 0.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Processing Ore Processing (kt) 178,796 20,044 13,152 11,551 11,469 11,683 11,560 10,305 7,623 0 Head Grade (g/t) 3.89 4.12 4.05 3.80 3.73 3.91 4.11 4.55 4.92 0.00 Recoveries (%) 85.4% 85.2% 86.9% 88.0% 88.0% 88.0% 88.0% 88.0% 88.0% 0.0% Recovered Grade (g/t) 3.32 350.8% 351.4% 334.7% 328.5% 344.1% 361.9% 400.1% 432.7% 0.0% 259 LoM C2032 - C2036 C2037 - C2041 C2042 - C2046 C2047 - C2051 C2052 - C2056 C2057 - C2061 C2062 - C2066 C2067 - C2071 C2072 Units Total 11 - 15 16 - 20 21 - 25 26 - 30 31 - 35 36 - 40 41 - 45 46 - 50 51 PGM Produced (4Eoz) 19,076 2,261 1,486 1,243 1,211 1,292 1,345 1,326 1,060 0 Basket Price Basket Price (R/4Eoz) 26,986 27,296 26,476 25,906 26,309 26,422 25,930 25,745 25,737 0 Revenue 4E Revenue (ZARm) 506,505 60,024 38,275 31,330 31,000 33,224 33,936 33,213 26,560 0 Other Metals (ZARm) 31,365 3,845 2,255 1,719 1,778 1,931 1,861 1,751 1,407 0 Base Metals (ZARm) 21,202 2,335 1,625 1,533 1,524 1,584 1,539 1,218 544 0 Revenue from sales of mining products (ZARm) 559,072 66,204 42,154 34,582 34,302 36,739 37,337 36,181 28,511 0 Operating Cost Direct Operations Cost (ZARm) 329,197 39,465 24,582 20,340 20,598 20,899 20,593 19,155 15,673 0 RBN Royalties (ZARm) 0 0 0 0 0 0 0 0 0 0 Terminal benefits costs (ZARm) 1,477 298 317 0 0 0 0 0 158 0 Environmental closure cost (ZARm) 995 101 171 0 0 0 0 0 0 595 Royalty payable (ZARm) 2,795 331 211 173 172 184 187 181 143 0 Recurring pre-tax income from continuing operations (EBITDA) (ZARm) 224,608 26,009 16,873 14,069 13,532 15,656 16,557 16,845 12,538 (595) Taxation (ZARm) 43,086 6,690 4,331 3,579 3,469 2,273 0 0 0 0 Net Income from continuing operations (ZARm) 181,522 19,319 12,543 10,491 10,063 13,384 16,557 16,845 12,538 (595) Capital Expenditure (ZARm) 14,634 1,232 834 815 683 695 690 637 166 0 Net Free cash (ZARm) 166,888 18,087 11,709 9,676 9,380 12,689 15,867 16,208 12,372 (595)
260 Table 115: TEM – TEM – Unit Analysis (ZAR/4Eoz) – 2022-2031 LoM C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 C2030 C2031 Units Total 1 2 3 4 5 6 7 8 9 10 Basket Price Basket Price (R/4Eoz) 26,986 27,936 27,972 27,793 27,804 27,992 28,065 28,060 27,914 27,812 27,543 Revenue 4E Revenue (R/4Eoz) 26,551 28,821 30,081 28,926 27,540 27,220 27,290 27,285 27,144 27,046 26,787 Other Metals (R/4Eoz) 1,644 2,123 2,036 1,942 1,843 1,847 1,844 1,843 1,811 1,789 1,719 Base Metals (R/4Eoz) 1,111 1,355 1,417 1,378 1,214 1,097 1,067 1,054 1,065 1,082 1,004 Revenue from sales of mining products (R/4Eoz) 29,307 32,299 33,535 32,246 30,596 30,164 30,202 30,182 30,020 29,917 29,509 Operating Cost Direct Operations Cost (R/4Eoz) 17,257 19,793 20,004 19,005 18,739 18,782 18,891 18,754 18,400 18,342 17,055 RBN Royalties (R/4Eoz) 0 0 0 0 0 0 0 0 0 0 0 Terminal benefits costs (R/4Eoz) 77 0 0 254 0 0 0 0 0 634 0 Environmental closure cost (R/4Eoz) 52 0 0 0 17 0 0 0 0 0 185 Royalty payable (R/4Eoz) 147 161 168 161 153 151 151 151 150 150 148 Recurring pre-tax income from continuing operations (EBITDA) (R/4Eoz) 11,774 12,344 13,363 12,826 11,687 11,231 11,159 11,277 11,470 10,792 12,122 Taxation (R/4Eoz) 2,259 2,594 3,183 3,178 2,858 2,787 2,792 2,797 2,913 2,748 3,092 Net Income from continuing operations (R/4Eoz) 9,516 9,750 10,180 9,648 8,829 8,444 8,367 8,480 8,557 8,044 9,030 Capital Expenditure (R/4Eoz) 767 2,736 1,574 1,055 1,101 909 818 917 682 616 672 Net Free cash (R/4Eoz) 8,748 7,014 8,606 8,593 7,727 7,535 7,549 7,563 7,875 7,429 8,359 261 Table 116: TEM – Unit Analysis (ZAR/4Eoz) – 2032-2071 LoM C2032 - C2036 C2037 - C2041 C2042 - C2046 C2047 - C2051 C2052 - C2056 C2057 - C2061 C2062 - C2066 C2067 - C2071 Units Total 11 - 15 16 - 20 21 - 25 26 - 30 31 - 35 36 - 40 41 - 45 46 - 50 Basket Price Basket Price (R/4Eoz) 26,986 27,296 26,476 25,906 26,309 26,422 25,930 25,745 25,737 Revenue 4E Revenue (R/4Eoz) 26,551 26,549 25,758 25,209 25,597 25,706 25,232 25,053 25,046 Other Metals (R/4Eoz) 1,644 1,701 1,517 1,383 1468 1,494 1,384 1,321 1,327 Base Metals (R/4Eoz) 1,111 1,033 1,093 1,233 1258 1,225 1,144 918 513 Revenue from sales of mining products (R/4Eoz) 29,307 29,282 28,369 27,825 28,323 28,425 27,761 27,292 26,885 Operating Cost Direct Operations Cost (R/4Eoz) 17,257 17,456 16,543 16,366 17,008 16,170 15,312 14,449 14,779 RBN Royalties (R/4Eoz) 0 0 0 0 0 0 0 0 0 Terminal benefits costs (R/4Eoz) 77 132 213 0 0 0 0 0 149 Enviromental closure cost (R/4Eoz) 52 45 115 0 0 0 0 0 0 Royalty payable (R/4Eoz) 147 146 142 139 142 142 139 136 134 Recurring pre-tax income from continuing operations (EBITDA) (R/4Eoz) 11,774 11,504 11,355 11,320 11,173 12,113 12,310 12,707 11,823 Taxation (R/4Eoz) 2,259 2,959 2,914 2,879 2,865 1,758 0 0 0 Net Income from continuing operations (R/4Eoz) 9,516 8,545 8,441 8,441 8,309 10,355 12,310 12,707 11,823 Capital Expenditure (R/4Eoz) 767 545 561 656 564 538 513 481 157 Net Free cash (R/4Eoz) 8,748 8,000 7,880 7,785 7,745 9,817 11,797 12,226 11,666 262 19.6 DCF Analysis The following NPV sensitivities are included in this Section: • NPV’s at a range of discount factors in relation to the Discount Rate of 5% (Real) [Refer Table 117]. A range of discount factors from 0% to 10% with their associated NPVs are presented for each case at different discount factors and the sensitivity to the discount factor can be evaluated. • Twin parameter sensitivities are presented evaluating Revenue against Operating Costs. NPVs at higher product price levels are shown up to a 20% increase in price, which captures any upside potential. Since markets are inherently volatile, the downside risk is reflected in the 20% decrease in price in increments. The achievability of LoM plans, budgets and forecasts cannot be assured as they are based on economic assumptions, many of which are beyond the control of Marikana Operations. Future cash flows and profits derived from such forecasts are inherently uncertain and actual results may be significantly more or less favourable. It is for this reason that the QP presents sensitivities for Operating Costs, ranging from -20% to +20%. The most optimistic analysis, which assumes prices have been under-estimated by 20% and Operating Costs over-estimated by 20%, yields an NPV in the top right-hand corner of Table 118. Conversely, the most pessimistic analysis, which assumes prices have been over-estimated by 20% and Operating Costs under-estimated by 20%, yields an NPV in the bottom left-hand corner of Table 119. • NPV sensitivity to sales revenue and capital expenditure (Table 118) derived from twin parameter sensitivities at the Discount Rate of 5% (Real). Twin parameter sensitivities are presented evaluating Revenue against capital expenditure costs. Capital expenditures are estimates until contracts, which specify the deliverable, are signed by clients. It is for this reason that the QP presents sensitivities for capital costs from -20% to +20%. The most optimistic analysis, which assumes prices have been under-estimated by 20% and capital expenditure costs over- estimated by 20%, yields an NPV in the top right-hand corner of Table 119. Conversely, the most pessimistic analysis, which assumes prices have been over-estimated by 20% and capital expenditure costs under-estimated by 20%, yields an NPV in the bottom left-hand corner of Table 119 . Table 117: NPV (Post-tax) at Various Discount Factors Discount Factor (%) NPV Current Ops (ZARm) 0.00% 166,888 2.00% 117,170 5.00% 80,174 7.00% 66,772 10.00% 54,161 263 Table 118: Twin Parameter NPV (Post-tax) Sensitivity at a 5% Discount Rate (Revenue, Operating Costs) - Current Operations Post-Tax NPV @ 5% Revenue Sensitivity Range (ZARm) -20% -10% -5% 0% 5% 10% 20% Total Capital Cost Sensitivity Range -20% 22,363 52,229 67,161 82,094 97,027 111,959 141,825 -10% 21,403 51,269 66,201 81,134 96,067 110,999 140,865 -5% 20,923 50,789 65,721 80,654 95,587 110,519 140,385 0% 20,443 50,309 65,241 80,174 95,107 110,039 139,905 5% 19,963 49,829 64,761 79,694 94,627 109,559 139,425 10% 19,483 49,349 64,281 79,214 94,147 109,079 138,945 20% 18,523 48,389 63,321 78,254 93,187 108,119 137,985 Table 119: Twin Parameter NPV (Post-tax) Sensitivity at a 5% Discount Rate (Revenue, Capital Expenditure) – Current Operations Post-Tax NPV @ 5% Revenue Sensitivity Range (ZARm) -20% -10% -5% 0% 5% 10% 20% Total Operating Cost Sensitivity Range -20% 56,823 86,688 101,621 116,553 131,486 146,419 176,284 -10% 38,633 68,498 83,431 98,364 113,296 128,229 158,094 -5% 29,538 59,404 74,336 89,269 104,201 119,134 148,999 0% 20,443 50,309 65,241 80,174 95,107 110,039 139,905 5% 11,349 41,214 56,147 71,079 86,012 100,944 130,810 10% 2,254 32,119 47,052 61,984 76,917 91,850 121,715 20% (15,936) 13,929 28,862 43,795 58,727 73,660 103,525 19.7 Summary Economic Analysis The summary economic analysis of Marikana is based on the Cash-Flow Approach. There is no other appropriate method of analysis for this operation. The summary economic evaluation for Marikana are based on the current business plan of the operation and excludes any impact of Secondary Taxation on Companies and adverse international or local events, impact of that risk is illustrated in Table 117 to Table 120 indicating sensitivity impact as a result of fluctuations in operating cost, capital and metal price sensitivities. The economic model has been undertaken to support the declaration of Mineral Reserves. The economic model has been undertaken for Mineral Reserves (Table 120 . Table 120: NPV (Post-tax) Relative to ZAR/kg PGM Basket Prices at 5 % Discount Rate - Current Operations Long Term Price (ZAR/4Eoz) (ZARm) Sensitivity Range -20% -10% -5% 26,986 5% 10% 20% NPV@the base case Discount Rate (ZARm) 20,443 50,309 65,241 80,174 95,107 110,039 139,905
264 19.8 QP Opinion The QP is satisfied that the economic analysis fairly represents the financial status of the operation as at 31 December 2020. 20 Adjacent Properties Marikana is part of the Western Limb of the Bushveld Complex. Table 121 is a list of adjacent mines. Positions of these mines are shown in Figure 4. The table below gives the mine, owner, commodities mined and link to the Company websites. For current information on these properties, the reader should refer to the official websites. No data from these mines has been used in the estimation of Mineral Resource however some operation information may have been shared in the estimation of the Mineral Reserves. Mineralization on the adjacent properties is continuous across all properties however, variations across the deposit occur and the quantum and grade of the mineralization at these mines may not be indicative of the same at Marikana. Kroondal and Rustenburg are owned and operated by the Registrant. There are shared services between these operations and the Marikana Operations. The QPs for these mines are the same as for the Marikana Operations. The QPs have verified the information in the public sources. The other mines are owned by 3rd parties and the QPs have not verified the information in public sources. Table 121: Adjacent Mines, Bushveld Complex, Western Limb Mine name Owners Commodities Source of info *Rustenburg Operations Sibanye-Stillwater PGM www.sibanyestillwater.com *Kroondal Operations Sibanye-Stillwater PGM www.sibanyestillwater.com Tharisa MIne Tharisa Minerals Chrome/PGM www.tharisa.com Leeuwkop Mine Aflplats (Impala Platinum) PGM https://www.implats.co.za Western Chrome Mines SAMANCOR Chrome (samancorcr.com) Rietvly (Rietvlei) Glencore Silica https://www.glencore.com/what-we- do/metals-and-minerals/ferroalloys 265 21 Other Relevant Data and Information 21.1 Risk Analysis 21.1.1 Financial Accuracy Table 122 provides details of accuracy limits in the major financial categories. Marikana does not directly report contingencies for Operating costs but rather provides for this as part of sustaining capital at 4% of Operating cost . There are no new capital projects and no assessed capital risks. Table 122: Financial Risks Risks Mitigation Measures Price Risk (Mineral Reserve Risk) - Revenue -assessed the prices using various sensitivities (-10% to +10%) - the forecast price considered multiple scenarios Economic Viability Risk (Mineral Reserve Risk) - Operating Costs -assessed the Operating Costs using various sensitivities (-20% to +20%) Economic Viability Risk (Mineral Reserve Risk) - Capital Expenditure -assessed the Capital Expenditure based on 4% of operating costs for sustaining capital and technical studies for new projects (-20% to +20%) 21.1.2 Risk to the Mineral Resources and Mineral Reserves As part of the annual operational planning process, the Rustenburg Operations management team assessed all the major risks that impact the execution of the plan. Sibanye-Stillwater maintains a risk register at the corporate level detailing all significant risks that may impact the operations. The Risk register is updated quarterly. Risks are listed by the source of the risk, the type of operational risk. Risks are assessed for likelihood of occurrence and severity for inherent risks to assess the unmitigated impact on the operations. The risk is reassessed once reasonable mitigation plans have been applied to give a residual risk using the same scale as for inherent risk. The following major risks have been identified. 21.1.2.1 Mineral Resources There are no deemed material risks to the Mineral Resource Estimate. 21.1.2.2 Mineral Reserves The key operational risks that could impact the Mineral Reserves are listed below. 266 Commodity prices and exchange rate assumptions Sibanye-Stillwater has adopted forward-looking price assumptions. Any material deviations from these assumptions could impact the Mineral Reserves, especially at marginal operations. The QPs are of the view that these prices applied to our LoM valuations are realistic considering the external guidance received. ESG and social unrest The SA PGM operations are situated in close proximity to large communities with high unemployment rates and low incomes. As such, it is continually at risk to social unrest events. From a social and governance perspective, the Group has implemented appropriate objectives and initiates to address this risk. From an environmental perspective, the area experiences significant pressure on potable and fresh water supply. The adoption of the PGM water stewardship, GHG and footprint reduction during 2022 will enable these operations to meet the requirements defined by our ESG commitments. Cost escalation Cost escalation assumptions relating to factors such as wages, utilities like electricity and operational consumables (explosives and steel) are aligned with Group estimates. Continuous improvement initiatives adopted to contain cost escalation are in place to mitigate this risk. Operational Risk Operational underperformance and slower than planned production build-up at projects may result in variations between planned and achieved production rates. Short interval controls are in place to enable the implementation of timeous interventions and, therefore, correction of deviations to plans. 22 Interpretation and Conclusions In considering the valuation as derived herein, a critical factor is the assumption regarding the future projection is the South African Rand (ZAR) exchange rate against the USD. The views expressed in this TRS have been based on the fundamental assumption that the required management resources and proactive management skills to access the adequate capital necessary to achieve the LoM plan projection for Marikana are sustained. The LoM plan for Marikana Operations has been reviewed in detail for appropriateness, reasonableness and viability, including the existence of and justification for departure from historical performance. The QP considers that the LoM is based on sound reasoning, engineering judgment and a technically achievable mine plan, within the context of the risk associated with the platinum mining industry. 23 Recommendations There are no recommendations for additional work or changes. 267 24 Qualified Persons’ Consents We, the signees, in our capacity as Qualified Persons pursuant to Subpart 1300 of Regulation S-K of the US Securities Act of 1933 (SK-1300), each hereby consent to: • the public filing and use by Sibanye-Stillwater of the Technical Report Summaries for which I am responsible; • the use and reference to my name, including my status as an expert or “Qualified Person” (as defined by SK-1300) in connection with the Technical Report Summaries for which I am responsible; • the use of any extracts from, information derived from or summary of the Technical Report Summaries for which I am responsible in the annual report of Sibanye-Stillwater on Form 20-F for the year ended 31 December 2021 (Form 20-F); and • the incorporation by reference of the above items as included in the Form 20-F into Sibanye- Stillwater’s registration statement on Form F-3 (File No. 333-234096) (and any amendments or supplements thereto). I am responsible for overseeing, and this consent pertains to, the Technical Report Summaries for which my name appears below and certify that I have read the Form 20-F and that it fairly and accurately represents the information in the Technical Report Summaries for which I am responsible. Dated: 22 April 2022 Property Name QP Name Affiliation to registrant Field or area of responsibility Signature SA PGM Marikana Operations Andrew Brown Full time employee Lead /s/ Andrew Brown Manie Keyser Full time employee Resources, Reserves, Mine Planning /s/ Manie Keyser Brian Smith Full time employee Mineral Reserves /s/ Brian Smith Nicole Wansbury Full time employee Mineral Resources /s/ Nicole Wansbury Stephan Botes Full time employee Surface and Mineral Rights /s/ Stephan Botes Mandy Jubileus Full time employee Environmental Compliance /s/ Mandy Jubileus Dewald Cloete Full time employee Mineral Processing /s/ Dewald Cloete Roderick Mugovhani Full time employee Financial Evaluation /s/ Roderick Mugovhani Makunga Daudet Seke Full Time Employee Sales and Metallurgical Accounting /s/ Makunga Daudet Seke
268 25 References 25.1 List of Reports and Sources of Information 25.1.1 Publications and Reports Ballhaus, C.G. 1988. Potholes of the Merensky Reef at Brakspruit Shaft, Rustenburg Platinum Mines: Primary disturbances in the magmatic stratigraphy. Economic Geology, vol. 83. p. 1140-1158. Beukes, J.P and van Zyl, P.G., 2017. Review of Atmospheric SO2 Data Collected with Passive Sampling and Regional Perspective, Atmospheric Chemistry Research Group, North West University, p. 27. Brown, A., Smith, B., Ross, H., Changara, L., Mugovhani, R., and Gewers, N., 2019, Competent Person’s Report on the Material Assets of the Rustenburg Operations including Hoedspruit PGM Projects Situated near Rustenburg, Northwest, South Africa, Sibanye Stillwater, Platinum Division, Mine Technical Services Team, unpubl, p. 257 Carr, H.W., Groves, D.I., and Cawthörne, R.G. 1994. The Importance of synmagmatic deformation in the formation of Merensky Reef potholes in the Bushveld Complex. Economic Geology, vol. 89. p. 1398-1410. Cawthorn, R.G., Eales, H.V., Walraven, F., Uken, R. and Watkeys, M.K., 2006. The Bushveld Complex. In: Geology of South Africa. Edited by M.R. Johnson, C.R. Anhaeusser and R.J. Thomas. Geological Society of South Africa. 261-281. Cawthorn, R.G., (2010). The Platinum Group Element Deposits of the Bushveld Complex in South Africa, Platinum Metals Rev., 2010, 54, (4) 205doi:10.1595/147106710x520222. https://www.technology.matthey.com/article/54/4/205-215/#B1 Crowson, P.,(2001) “Minerals Handbook 2000–01: Statistics and Analyses of the World's Minerals Industry”, Mining Journal Books Ltd, Edenbridge, Kent, UK. Quoted in Cawthorn 2010. https://www.technology.matthey.com/article/54/4/205-215/#B1 Cowley, A., Bloxham, L., Brown, S., Cole, L., Fujita, M., Girardot, N., Jiang, J., Raithatha, R., Ryan, M., Shao, E., Tang, B., Wang, A., Xiaoyan, F., 2021. The PGM market report, Johnson-Matthey,. https://matthey.com/en/news/2021/pgm-market-report-february-2021 Gruenewaldt, R.,(2017). Air Quality Short Summary Report for Various Scenarios at Lonmin Marikana, Airshed. Midrand March 2017. Golder Associates, 2021. Determination of the 2021 Closure Costs for the Marikana Platinum Mining Operation, Sibanye-Stillwater Limited, Golder Associates Africa (Pty) Ltd, 21467970-349390-1, p. 39 Krivolutskaya, N.A. (2014) Evolution of Trap Magmatism and Pt-Cu-Ni mineralization in the Noril'sk region. Publishing Association of Scientific Publications KMK, Moscow [in Russian]. McCallum, I.S. (1996) The Stillwater Complex. In Developments in Petrology. Elsevier. p.441-483. doi:10.1016/s0167-2894(96)80015-7 O’Brien. A., and Scheepers, A., 2016. Sibanye Rustenburg Platinum Mines Limited, Environmental Management Programme (NW30/5/1/2/2/82 MR), WSP Parsons Brinckerhoff, unpbl, p453 269 Potgieter, J.G., 2011. Atmospheric Impact Assessment, Information/Subsections for 2011 EMPR: WPL, Central and EL, Environgaka cc, unpub, p. 57 Reczko, B.F.F., Oberholzer, J.D., Res, M., Erikson, P.G. and Schreiber, U.M. (1995). A re-evaluation of the volcanism of the Palaeoproterozoic Pretoria Group (Kaapvaal craton) and hypothesis on basin development. Journal of African Earth Sciences 21, 505-519. Scoon, R.N. and Mitchell; A.A. The principal geological features of the Mooihoek platiniferous dunite pipe, eastern limb of the Bushveld Complex, and similarities with replaced Merensky Reef at the Amandelbult Mine, South Africa. South African Journal of Geology 2011; 114 (1): 15–40. Smith, D.S, Basson, I.J, Reid, D,L; Normal Reef subfacies of the Merensky Reef at Northam Platinum mine, Zwartklip Facies, Western Bushveld Complex, South Africa. The Canadian Mineralogist 2004; 42 (2): 243–260. doi: https://doi.org/10.2113/gscanmin.42.2.243 Tetteh, M. and Cawood, F., (2014). Mine call factor issues from a surface mine perspective, https://www.ee.co.za/article/mine-call-factor-issues-surface-mine- perspective.html#:~:text=The%20theory%20of%20mine%20call%20factor%20%28MCF%29%20compares, the%20mines%20evaluation%20methods%20expressed%20as%20a%20percentage. Watson, B.P., Hoffmann, D., and Roberts, D.P. (2021). Investigation of stress in a pothole in the Bushveld Complex: A case study. In Journal of the Southern African Institute of Mining and Metallurgy. Volume 121 n.1 Johannesburg. January 2021. Wellsted, J., 2020. Biodiversity Management at Sibanye Stillwater, Sibanye-Stillwater Limited, unpubl, p. 20 25.1.2 Spreadsheets and Presentations Consolidated Group structure-8 December 2020.xlsx Marikana Mine - Finance Section Backup 20220404.xlsx Copy of TRS Reserve Tables 31 Dec 2021 v3 Final 14-04-2022.xlsx 26 Glossary of terms South African Mining terms Mine Call Factor(MCF) - compares the sum of metal produced in recovery plus residue to the metal called for by the mines evaluation methods expressed as a percentage. For explanation, see Tetteh and Cawood(2014). Reef – South African Mining term for a Seam. Derived from Afrikaans/Dutch rif- ridge for the Witwatersrand goldfields where the seam formed ridges in outcrop. 270 27 Reliance on information provided by the registrant The QPs have relied on information provided by Sibanye-Stillwater Kroondal Operations and Sibanye- Stillwater (the Registrant) in preparing the findings and conclusions regarding the following aspects of the Modifying Factors outside of the QPs’ expertise: • Macroeconomic trends, data and assumptions, and commodity prices (Section 16) • Risks (Section 21.2) Sibanye-Stillwater assess the factors above at a corporate level and has the necessary skills to make this assessment.
Exhibit 96.3 TECHNICAL REPORT SUMMARY ON THE MATERIAL ASSETS OF THE RUSTENBURG OPERATIONS Situated near Rustenburg, North West Province, South Africa 31 December 2021 Prepared by: Qualified Persons from Sibanye-Stillwater, PGM Operations i Important Notices Wherever mention is made of “Rustenburg Operations”, for the purposes of this Technical Report Summary, it encompasses mining activities under Sibanye Rustenburg Platinum Mines Proprietary Limited in the North West Province, South Africa. In this document, a point is used as the decimal marker and the comma is used for the thousands separator (for numbers larger than 999) in the text. In other words, 10,148.32 denotes ten thousand one hundred and forty-eight point three two. The word ‘tonnes’ denotes a metric tonne (1,000 kg). The abbreviation “lb” denotes the weight in pounds in the sense understood in the USA. The Platinum, Palladium, Rhodium and Gold (4E) prices are quoted in US dollars per troy ounce (USD/oz.) or South African Rand per kilogram (ZAR/kg). 6E denotes a basket of PGM’s Platinum, Palladium, Rhodium, Gold, Iridium and Ruthenium. Chrome refers to Chromium Oxide Cr2O3. • The paylimit (cm.g/t or g/t) of an operation is described as the average value or grade for that operation at which all direct and indirect costs are covered, i.e., the value at which it is estimated that ore can be mined without profit or loss. • The cut-off grade (cm.g/t or g/t) of an operation is described as the minimum value or grade at which an area can mine to maintain an average value in line with the paylimit. The cut- off is unique to the orebody being mined and is dependent on maintaining a mining mix that follows the orebody’s value distribution. NOTE: The Merensky and UG2 Reefs at the Rustenburg Operations and the contiguous Sibanye- Stillwater owned Kroondal Operations are single orebodies and are estimated as single geological units across the two properties. A portion of the Rustenburg Mineral Reserves will be accessed through the Kroondal Infrastructure and this tonnage is reflected in the Kroondal Life-of-Mine Schedule and financial model and not Rustenburg. However, Mineral Resources and Mineral Reserves are divided and reported within their respective mineral rights boundaries.Trademarks. Certain software and methodologies may be proprietary. Where proprietary names are mentioned TM or © are omitted for readability. This report contains statements of a forward-looking nature which are subject to some known and unknown risks, uncertainties and other factors that may cause the results to differ materially from those anticipated in this report. ii Date and Signature Page Qualified Persons Position Signature Signature Date Andrew Brown Vice President: Mine Technical Services /s/ Andrew Brown 14 April 2022 Manie Keyser Senior Manager Mine Planning and Resource Management /s/ Manie Keyser 14 April 2022 Nicole Wansbury Unit Manager Geology Mineral Resources Nicole Wansbury 14 April 2022 Brian Smith Unit Manager Survey /s/ Brian Smith 14 April 2022 Stephan Botes Unit Manager – Surface and Mineral Rights /s/ Stephan Botes 14 April 2022 Mandy Jubileus Environmental Manager /s/ Mandy Jubileus 14 April 2022 Dewald Cloete SVP Processing /s/ Dewald Cloete 14 April 2022 Roderick Mugovhani SVP Finance /s/ Roderick Mugovhani 14 April 2022 iii Table of Contents 1 EXECUTIVE SUMMARY 1 1.1 INTRODUCTION 1 1.2 PROPERTY DESCRIPTION, MINERAL RIGHTS AND OWNERSHIP 1 1.3 GEOLOGY AND MINERALISATION 2 1.4 EXPLORATION STATUS, DEVELOPMENT, OPERATIONS AND MINERAL RESOURCE ESTIMATES 2 1.5 MINING METHODS, ORE PROCESSING, INFRASTRUCTURE AND MINERAL RESERVES 6 1.6 CAPITAL AND OPERATING COST ESTIMATES AND ECONOMIC ANALYSIS 8 1.7 PERMITTING REQUIREMENTS 9 1.8 CONCLUSIONS AND RECOMMENDATIONS 9 2 INTRODUCTION 11 2.1 REGISTRANT 11 2.2 COMPLIANCE 12 2.3 TERMS OF REFERENCE AND PURPOSE OF THE TECHNICAL REPORT 12 2.4 SOURCES OF INFORMATION 14 2.5 SITE INSPECTION BY QUALIFIED PERSONS 14 2.6 UNITS, CURRENCIES AND SURVEY COORDINATE SYSTEM 14 2.7 RELIANCE ON INFORMATION PROVIDED BY OTHER EXPERTS 15 3 PROPERTY DESCRIPTION 17 3.1 LOCATION AND OPERATIONS OVERVIEW 17 3.2 MINERAL TITLE 20 3.3 ROYALTIES 25 3.4 LEGAL PROCEEDINGS AND SIGNIFICANT ENCUMBRANCES TO THE PROPERTY 25 4 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY 26 4.1 TOPOGRAPHY, ELEVATION AND VEGETATION 26 4.2 ACCESS, TOWNS AND REGIONAL INFRASTRUCTURE 26 4.3 CLIMATE 27 4.4 INFRASTRUCTURE AND BULK SERVICE SUPPLIES 27 4.5 PERSONNEL SOURCES 27 5 HISTORY 29 5.1 OWNERSHIP HISTORY 29 5.2 PREVIOUS EXPLORATION AND MINE DEVELOPMENT 30 5.2.1 Previous Exploration 30 5.2.2 Previous Development 32 6 GEOLOGICAL SETTING, MINERALIZATION AND DEPOSIT 34 6.1 REGIONAL GEOLOGY 34 6.2 DEPOSIT TYPES 37 6.2.1 Formation of Deposit 37 6.2.2 Stillwater Complex 38
iv 6.2.3 Norilsk Province 38 6.2.4 Sudbury Complex 38 6.2.5 The Great Dyke 39 6.2.6 The Bushveld Complex 39 6.3 LOCAL AND PROPERTY GEOLOGY 40 6.3.1 Stratigraphy 40 6.3.2 The Ore Bodies 42 6.3.3 Structure 43 6.3.4 Mineralogy 48 7 EXPLORATION 50 7.1 EXPLORATION DATA 50 7.2 GEOPHYSICAL SURVEYS 50 7.3 TOPOGRAPHIC SURVEYS 50 7.4 EXPLORATION AND MINERAL RESOURCE EVALUATION DRILLING 50 7.4.1 Overview 50 7.4.2 Planned Evaluation Drilling for 2021 53 7.4.3 Drilling Methods 55 7.4.4 Core Logging and Reef Delineation 62 7.5 SURVEY DATA 64 7.6 DENSITY DETERMINATION 65 7.6.1 Underground Drillholes and Channel Samples 65 7.6.2 Tailings Facility 66 7.7 UNDERGROUND MAPPING 66 7.8 HYDROLOGICAL DRILLING AND TESTWORK 66 7.9 GEOTECHNICAL DATA, TESTING AND ANALYSIS 66 7.9.1 Data Collection 66 7.9.2 Testing Methods 67 7.9.3 Geotechnical Rockmass Characterisation 68 7.9.4 Geotechnical Results and Interpretation 69 8 SAMPLE PREPARATION, ANALYSES AND SECURITY 72 8.1 SAMPLING GOVERNANCE AND QUALITY ASSURANCE 72 8.2 REEF SAMPLING – SURFACE 72 8.3 REEF SAMPLING – UNDERGROUND 73 8.3.1 Core Samples 73 8.3.2 Channel Sampling 73 8.4 SAMPLE PREPARATION AND ANALYSIS 74 8.4.1 Laboratory 74 8.4.2 Sample Preparation and Analysis 74 8.4.3 QP Opinion 75 8.5 ANALYTICAL QUALITY CONTROL 75 8.5.1 Nature and Extent of the Quality Control Procedures 75 8.5.2 Quality Control Results 75 8.5.3 QP Opinion 77 v 9 DATA VERIFICATION 78 9.1 DATA STORAGE AND DATABASE MANAGEMENT 78 9.2 DATABASE VERIFICATION 78 9.2.1 Mapping 78 9.2.2 Drillholes 79 9.2.3 Channel Sampling 79 9.3 QP OPINION 79 10 MINERAL PROCESSING AND METALLURGICAL TESTWORK 80 11 MINERAL RESOURCE ESTIMATES 80 11.1 ESTIMATION DOMAINS 80 11.1.1 Compositing 80 11.1.2 Estimation Domains 86 11.2 ESTIMATION TECHNIQUES 90 11.2.1 Grade and Tonnage Estimation 90 11.2.2 Grade Control and Reconciliation 101 11.3 MINERAL RESOURCE CLASSIFICATION 102 11.3.1 Classification Criteria 102 11.3.2 Mineral Resource Technical and Economic Factors 104 11.4 MINERAL RESOURCE STATEMENTS 108 11.4.1 Mineral Resources 108 11.4.2 Mineral Resources per Mining Area (Inclusive Mineral Reserves) 112 11.4.3 Changes in the Mineral Resources from Previous Estimates (Inclusive of Mineral Reserves) 115 11.5 QP STATEMENT ON THE MINERAL RESOURCE ESTIMATION AND CLASSIFICATION 116 12 MINERAL RESERVE ESTIMATES 117 12.1 MINERAL RESERVE METHODOLOGY 117 12.2 MINE PLANNING PROCESS 117 12.3 HISTORICAL MINING PARAMETERS 118 12.4 SHAFT AND MINE PAYLIMITS 120 12.4.1 Paylimits 120 12.4.2 Modifying Factors and LoM plan 120 12.5 LOM PROJECTS 125 12.6 SPECIFIC INCLUSIONS AND EXCLUSIONS 125 12.6.1 Specific Exclusions 125 12.6.2 Specific Inclusion 125 12.7 MINERAL RESERVE ESTIMATION 125 12.8 SURFACE SOURCES 129 12.9 MINERAL RESERVES STATEMENT 129 12.10 MINERAL RESERVE SENSITIVITY 132 12.11 QP STATEMENT ON THE MINERAL RESERVE ESTIMATION 132 13 MINING METHODS 133 13.1 INTRODUCTION 133 vi 13.2 SHAFT INFRASTRUCTURE, HOISTING AND MINING METHODS 135 13.2.1 Shaft Infrastructure 135 13.2.2 Hoisting 136 13.2.3 Mining Methods 136 13.3 GEOTECHNICAL ANALYSIS 137 13.3.1 Geotechnical Conditions 137 13.3.2 Stress and seismological setting 137 13.3.3 Regional and Local Support 137 13.4 MINE VENTILATION 138 13.5 REFRIGERATION AND COOLING 138 13.6 FLAMMABLE GAS MANAGEMENT 138 13.7 MINE EQUIPMENT 138 13.8 PERSONNEL REQUIREMENTS 139 13.9 FINAL LAYOUT MAP 139 14 PROCESSING AND RECOVERY 140 14.1 PROCESSING FACILITIES 140 14.1.1 Waterval UG2 Concentrator 141 14.1.2 Waterval Retrofit Concentrator 145 14.1.3 Western Limb Tailings Retreatment Plant (WLTR Plant) 149 14.1.4 Chrome Retreatment Plant (CRP) 152 14.1.5 Platinum Mile Concentrator (PMR) 153 14.2 FUTURE PROJECTS 156 14.3 SAMPLING, ANALYSIS, PGM ACCOUNTING AND SECURITY 156 14.4 PLANT LOCK-UP 156 14.5 FINAL PRODUCT 157 14.6 ENERGY 157 14.7 WATER 157 14.8 PERSONNEL 157 14.9 QP OPINION ON PROCESSING 157 15 INFRASTRUCTURE 158 15.1 OVERVIEW OF INFRASTRUCTURE 158 15.2 TAILINGS STORAGE FACILITIES 159 15.2.1 Paardekraal Tailings Complex 160 15.2.2 Hoedspruit Tailing Complex 160 15.2.3 Waterval East and West TSF 160 15.2.4 LoM Deposition 161 15.3 POWER SUPPLY 162 15.4 BULK WATER, FISSURE WATER AND PUMPING 163 15.5 ROADS 164 15.6 EQUIPMENT MAINTENANCE 164 15.6.1 Surface Workshops 164 15.6.2 Underground Workshops 164 15.7 OFFICES, HOUSING, TRAINING FACILITIES, HEALTH SERVICES ETC. 164 vii 15.8 QP OPINION ON INFRASTRUCTURE 165 16 MARKET STUDIES 166 16.1 CONCENTRATES AND REFINED PRODUCTS 166 16.2 METALS MARKETING AGREEMENTS 166 16.3 MARKETS 166 16.3.1 Introduction 166 16.3.2 Demand Summary 166 16.3.3 Supply Summary 167 16.4 METALS PRICE DETERMINATION 169 16.4.1 Exchange Rate 169 16.4.2 Platinum Group Metals Price Deck 169 16.4.3 Comparison to 2019 Prices 170 17 ENVIRONMENTAL STUDIES, PERMITTING, PLANS, NEGOTIATIONS/ AGREEMENTS WITH LOCAL INDIVIDUALS OR GROUPS 171 17.1 SOCIAL AND COMMUNITY AGREEMENTS 171 17.1.1 Overview- Mine Community Development 171 17.1.2 Vision 171 17.1.3 Communities’ Priorities 172 17.2 HUMAN RESOURCES 173 17.2.1 Introduction 173 17.2.2 Human Resources 174 17.2.3 Legislation 174 17.2.4 Human Resource Development (Training) 176 17.2.5 Remuneration Policies 176 17.2.6 Industrial Relations 177 17.2.7 Employment Equity and Women in Mining (WIM) 177 17.3 HEALTH AND SAFETY 179 17.3.1 Policies and Procedures 179 17.3.2 Statistics 179 17.3.3 Occupational Health and Safety Management 180 17.3.4 HIV/AIDS 180 17.4 TERMINAL BENEFITS 180 17.5 ENVIRONMENTAL STUDIES 181 17.5.1 Introduction 181 17.5.2 Baseline Studies 2021 183 17.5.3 Zone of Influence 183 17.5.4 Climate Change and Greenhouse Gas Emissions, Air Quality 187 17.5.5 Biodiversity Management 189 17.5.6 Water Use Strategy 190 17.5.7 Waste Management 194 17.5.8 Environmental Reporting 194 17.5.9 Closure Planning and Costs 200 17.6 QP OPINION 202
viii 18 CAPITAL AND OPERATING COSTS 203 18.1 OVERVIEW 203 18.2 CAPITAL COSTS 203 18.3 OPERATING COSTS 203 18.3.1 Operating Costs by Activity 203 18.3.2 Operating Costs 203 18.3.3 Surface Sources Costs 203 18.3.4 Processing Costs 204 18.3.5 Allocated Costs 204 19 ECONOMIC ANALYSIS 207 19.1 INTRODUCTION 207 19.2 ECONOMIC ANALYSIS APPROACH 207 19.3 ECONOMIC ANALYSIS BASIS 207 19.4 TEM PARAMETERS 208 19.5 TECHNICAL ECONOMIC MODEL 208 19.6 DCF ANALYSIS 215 19.7 SUMMARY ECONOMIC ANALYSIS 216 19.8 QP OPINION 217 20 ADJACENT PROPERTIES 218 21 OTHER RELEVANT DATA AND INFORMATION 219 21.1 RISK ANALYSIS 219 21.1.1 Financial Assessment Accuracy 219 21.1.2 Risk to the Mineral Resources and Mineral Reserves 219 21.2 RUSTENBURG AND KROONDAL SHARED MINING SERVICES 220 22 INTERPRETATION AND CONCLUSIONS 222 23 RECOMMENDATIONS 223 24 REFERENCES 224 24.1 LIST OF REPORTS AND SOURCES OF INFORMATION 224 24.1.1 Publications and Reports 224 24.1.2 Spreadsheets and Presentations 225 24.2 GLOSSARY OF TERMS 225 25 QUALIFIED PERSONS’ CONSENTS 226 26 RELIANCE ON INFORMATION PROVIDED BY THE REGISTRANT 227 ix Figure 1: Ownership and Company Structure for Rustenburg ................................................ 11 Figure 2: General Location of the Material Assets as at 31 December, 2021 ........................ 17 Figure 3: Rustenburg Operations................................................................................................ 19 Figure 4: Plan Showing Mineral Right ......................................................................................... 24 Figure 5: Aeromagnetic Image Over Rustenburg Operations. ............................................... 31 Figure 6: Geology of the Bushveld Complex, South Africa ..................................................... 35 Figure 7: Geology of the Western Limb of the Bushveld Complex, South Africa ................... 36 Figure 8: General Stratigraphic Column of the Rustenburg Layered Suite ............................ 37 Figure 9: General Stratigraphic Column of the Local Geological Succession ...................... 41 Figure 10: Structure Map of Rustenburg .................................................................................... 44 Figure 11: A Down Dip Cross-section Showing Merensky and UG2 Reefs (S-N) ..................... 45 Figure 12: Example of a Shallow Dipping Pothole Associated with the UG2 ......................... 46 Figure 13: Example of Deep Potholing Associated with the UG2 ........................................... 47 Figure 14: IRUP (red) Unconformably Cut Across the Layered Lithological Sequence. ........ 48 Figure 15: Reconciliation of Drillhole Data ................................................................................ 52 Figure 16 Reconciliation of Historic Drillhole Data .................................................................... 52 Figure 17: Overview of Drilled Boreholes ................................................................................... 54 Figure 18: Overview of Drilled Boreholes on Waterval Tailings ................................................ 55 Figure 19: Example of Diamond Drill Core ................................................................................ 56 Figure 20: Schematic Vertical Section of a Typical Surface Drillhole ...................................... 57 Figure 21: Configurations for Cover Drilling - Single Cover Drilling Layout (one-sided). ........ 59 Figure 22: Configurations for Cover Drilling - Double Cover Drilling Layout. .......................... 60 Figure 23: Ring Cover Configuration – Drilling and Sealing Order. .......................................... 61 Figure 24: Example of CRM Result Monitoring .......................................................................... 76 Figure 25: Example of Blank Result Monitoring .......................................................................... 76 Figure 26: Merensky Reef Geozones .......................................................................................... 82 Figure 27: Example of a Merensky Reef Composite Definition ................................................ 83 Figure 28: Example of a Merensky Reef Composite - Section Plot .......................................... 84 Figure 29: Example of UG2 Reef Composite cuts for different areas in Rustenburg.............. 85 Figure 30: UG2 Reef Mineral Resource Composite .................................................................. 86 Figure 31: Merensky Reef Geozones .......................................................................................... 87 Figure 32: UG2 Reef Geozones .................................................................................................. 89 x Figure 33: Some Histograms of the UG2 Reef ........................................................................... 91 Figure 34: Some Histograms of the Merensky Reef ................................................................... 92 Figure 35: Example of a Variogram Map .................................................................................. 93 Figure 36: Example of Variogram for 4E Grade and Thickness ................................................ 93 Figure 37: KNA for Block Sizes – Well Informed Blocks ............................................................... 97 Figure 38: KNA for Discretization – Poorly Informed Blocks ....................................................... 97 Figure 39: Section Plot UG2 Reef – Data versus Model ............................................................ 99 Figure 40: Section Plot Merensky - Data versus Model ........................................................... 100 Figure 41: UG2 Reef grade -4E –Data (points) versus Model ................................................. 101 Figure 42: Mineral Resource Classification for the Merensky Reef ........................................ 103 Figure 43: Mineral Resource Classification for the UG2 Reef ................................................. 104 Figure 44: Total Geological Losses for the Merensky Reef ..................................................... 105 Figure 45: Total Geological Losses for the UG2 Reef ............................................................. 106 Figure 46: Conversion of Mineral Resource to Mineral Reserve ............................................ 112 Figure 47: Rustenburg and Kroondal Merensky Reef Accessibility ........................................ 113 Figure 48: Rustenburg and Kroondal UG2 Reef Accessibility ................................................ 114 Figure 49: Rustenburg Operations Underground and Surface Mineral Resource Reconciliation .......................................................................................................... 116 Figure 50: Mineral Reserves Classification as at 31 December 2021- Merensky Reef (includes adjacent mine of the registrant) ............................................................ 127 Figure 51: Mineral Reserves Classification as at 31 December 2021- UG2 Reef (includes adjacent mine of the registrant) ............................................................................ 128 Figure 52: The Rustenburg Operations Mineral Reserve Reconciliation at 31 December 2021 ........................................................................................................................... 132 Figure 53: Typical Merensky Reef Mine Layout ....................................................................... 133 Figure 54: Typical UG2 Reef Mine Layout ................................................................................ 134 Figure 55: Cross sectional Schematic of a Vertical Shaft ....................................................... 135 Figure 56: Cross sectional Schematic of a Decline shaft ....................................................... 135 Figure 57: The Schematic Process Flow Diagram for Waterval UG2 Concentrator ............. 143 Figure 58: Waterval UG2 Concentrator Throughput Forecast ............................................... 144 Figure 59: Waterval UG2 Concentrator Production and Recovery Forecast ...................... 145 Figure 60: The Schematic Process Flow Diagram for Waterval Retrofit Concentrator ........ 147 Figure 61: Watervaal Retrofit Concentrator Throughput Forecast ........................................ 148 Figure 62: Watervaal Retrofit Concentrator Production and Recovery Forecast ............... 149 xi Figure 63: The Schematic Process Flow Diagram for Western Limb Tailings Recovery Plant .......................................................................................................................... 150 Figure 64: Western Limb Tailings Retreatment Plant Throughput Forecast ........................... 151 Figure 65: Western Limb Tailings Retreatment Plant Production and Recovery Forecast ... 152 Figure 66: The Schematic Process Flow Diagram for Platinum Mile ...................................... 154 Figure 67: Platinum Mile Retrofit Concentrator Throughput Forecast ................................... 155 Figure 68: Western Limb Tailings Retreatment Plant Production and Recovery Forecast ... 155 Figure 69: Locations of Major Surface Infrastructure at Rustenburg ..................................... 159 Figure 70 : Price trends 2000-2021 ............................................................................................ 169 Figure 71: RPM Surface Water Drainage and Monitoring Points ........................................... 187 Figure 72: Rustenburg Water Use Summary ............................................................................ 190 Figure 73: The Schematic Process Flow Diagram for Water Handling at the Rustenburg Operations ................................................................................................................ 193
xii Table 1: Attributable Mineral Resources Exclusive of Mineral Reserves as at 31 December 2021 74% .................................................................................................... 4 Table 2: Attributable Mineral Resources Inclusive of Mineral Reserves as at 31 December 2021 at 74% ............................................................................................... 5 Table 3: Attributable Mineral Reserves as at 31 December 2021 at 74% ................................. 7 Table 4: NPV (Post-tax) Relative to ZAR/4Eoz PGM Basket Prices at 5 % Discount Rate- Current Operations ...................................................................................................... 8 Table 5: Twin Parameter NPV (Post-tax) Sensitivity at a 5% Discount Rate (Capital Costs) _Current Operations .................................................................................................... 8 Table 6: Twin Parameter NPV (Post-tax) Sensitivity at a 5% Discount Rate (Revenue, Operating Costs) _Current Operations ...................................................................... 9 Table 7: Details of QPs Appointed by Sibanye-Stillwater ......................................................... 13 Table 8: Units Definitions .............................................................................................................. 14 Table 9: Technical Experts/Specialists Supporting the QPs ...................................................... 16 Table 10: Summary of Mineral Rights held for the Rustenburg Operations ............................ 21 Table 11: Mining Right Status of the Rustenburg Operations ................................................... 25 Table 12: Number of Permanent Employees ............................................................................ 28 Table 13: Origin of Employees .................................................................................................... 28 Table 14: Historical Development .............................................................................................. 29 Table 15: Historical Production and Financial Parameters ...................................................... 32 Table 16: Rustenburg Evaluation Drilling Costs.......................................................................... 53 Table 17: Quality Control in Drilling ............................................................................................ 64 Table 18: Summary of the material properties of the dominant hanging wall and footwall rock types (Conventional) .......................................................................... 71 Table 19: Summary of the material properties of the dominant hanging wall and footwall rock types (Mechanized) ........................................................................... 71 Table 20: Rock mass classes determined from RMR total ratings and meaning ................... 71 Table 21: Summary of Variogram Model Parameters for the Merensky Facies ..................... 94 Table 22: Summary of Variogram Model Parameters for all the UG2 Facies ......................... 95 Table 23: Estimation Parameters for the Tailings Storage Facility ............................................ 96 Table 24: Kriging Parameters ...................................................................................................... 98 Table 25: Confidence Levels for Key Criteria for Mineral Resource Classification ............... 102 Table 26: Commodity Price and Exchange Rate Assumptions for Cut-off Calculations* ... 107 Table 27: 6E Prill Split Percentages Applied per Reef ............................................................. 107 xiii Table 28: Parameters Used in the Cut-off Calculation for the MR and UG2 Reef ............... 108 Table 29: Cut-off Grades Calculated for the MR, UG2 Reef and Surface Operations. ...... 108 Table 30: Prill Split Mineral Resources (Inclusive of Mineral Reserves) ................................... 108 Table 31: Mineral Resources Exclusive of Mineral Reserves as at 31 December 2021 at 100% .......................................................................................................................... 110 Table 32: Attributable Mineral Resource Exclusive of Mineral Reserves as at 31 December2021 ........................................................................................................ 110 Table 33: Mineral Resources Inclusive of Mineral Reserves as at 31 December 2021 at 100% .......................................................................................................................... 111 Table 34: Attributable Mineral Resource Inclusive of Mineral Reserves as at 31 December 2021 ....................................................................................................... 111 Table 35: Mineral Resource Inclusive of Mineral Reserves per Mining Area as at 31 December 2021 at 100% ......................................................................................... 115 Table 36: Historical Mining Statistics by Section ...................................................................... 119 Table 37: Mineral Reserve Mining Modifying Factors Conventional Shafts, (Thembelani, Siphumelele, Khuseleka) ......................................................................................... 121 Table 38: Mineral Reserve Mining Modifying Factors Mechanized Shafts (Bathopele) ....... 122 Table 39: LoM Plans – Current Operations 2022-2031 ............................................................. 123 Table 40: LoM Plans – Current Operations 2032-2051 ............................................................. 124 Table 41: Prill Split and Recovery for Mineral Reserves ........................................................... 129 Table 42: Mineral Reserve as at 31 December 2021 at 100% ................................................ 130 Table 43: Attributable Mineral Reserve as at 31 December 2020 ......................................... 130 Table 44: Mineral Reserve per Mining Area as at 31 December 2020 at 100% .................... 131 Table 45: Attributable Mineral Reserve per Mining Area as at 31 December 2020 ............. 131 Table 46: Hoisting Capacities of the Rustenburg Shafts ......................................................... 136 Table 47: Major Mine Equipment ............................................................................................. 138 Table 48: Rail Bound Equipment Summary – 2021 .................................................................. 139 Table 49: Mineral Processing Plant Parameters. ..................................................................... 140 Table 50: Process Equipment Summary ................................................................................... 141 Table 51: Waterval UG2 Concentrator Production Forecast and Operational Data ......... 144 Table 52: Waterval Retrofit Concentrator Production Forecast and Operational Data ..... 148 Table 53: Western Limb Tailings Retreatment Plant Production Forecast and Operational Data .................................................................................................... 151 Table 54: Platinum Mile Plant Production Forecast and Operational Data ......................... 154 xiv Table 55: Paardekraal Central Planned Deposition Strategy ................................................ 160 Table 56: LoM Assessment of Tailings Facilities ........................................................................ 161 Table 57: Installed Power Capacities. ..................................................................................... 162 Table 58: PGM Demand 2021 .................................................................................................. 167 Table 59: Platinum Supply 2021 ................................................................................................ 168 Table 60: Exchange Rates ........................................................................................................ 169 Table 61: PGM Deck Price Scenarios ....................................................................................... 170 Table 62: Comparison of Mineral Reserve Prices Current and Previous Year ...................... 170 Table 63: SLP Projects for Rustenburg (2016-2020) .................................................................. 173 Table 64: Undertaking and Guidelines .................................................................................... 174 Table 65: HDSA in Management as at 31 December 2021 ................................................... 174 Table 66: Breakdown of Employee Profile as at 31 December 2021 .................................... 175 Table 67: Employee Turnover ................................................................................................... 175 Table 68: Labour Unavailability and Absenteeism ................................................................. 176 Table 69: Rustenburg Total Employees – Snapshot Report for the Month December 2021 ................................................................................................................................... 178 Table 70: Rustenburg Total Contractors (excluding Ad-Hoc Contractors) .......................... 179 Table 71: Safety Statistics .......................................................................................................... 180 Table 72: Baseline Studies ......................................................................................................... 183 Table 73: Rustenburg tCO2e Emissions Inventory 2021 .......................................................... 188 Table 74: Environmental Monitoring and Reporting Periods.................................................. 194 Table 75: Summary of the Audits for Rustenburg .................................................................... 195 Table 76: Rustenburg Compliance to Legislation ................................................................... 196 Table 77: Material Risks and Action Plan ................................................................................. 197 Table 78: Future Actions ............................................................................................................ 199 Table 79: Closure Components ................................................................................................ 200 Table 80: Historical and Forecast Capital Expenditure – Current Operations 2022 - 2031 ................................................................................................................................... 205 Table 81: Historical and Forecast Capital Expenditure – Current Operations 2032 2053 .... 205 Table 82: Historical and Forecast Operating Costs 2022 - 2030 ............................................ 205 Table 83: Historical and Forecast Operating Costs 2031 - 2052 ............................................ 206 Table 84: TEM Parameters ......................................................................................................... 208 xv Table 85: TEM – Mining, Processing, PGM’s Sold and Revenue, Cash Costs, Taxation, Capital Expenditure and Free Cash – 2022-2031 .................................................. 209 Table 86: TEM – Mining, Processing, PGM’s Sold and Revenue, Cash Costs, Taxation, Capital Expenditure and Free Cash – 2032-2052 .................................................. 211 Table 87: TEM – Unit Analysis (ZAR/4Eoz) – 2022-2031 ............................................................. 213 Table 88: TEM – Unit Analysis (ZAR/4Eoz) – 2032-2051 ............................................................. 214 Table 89: NPV (Post-tax) at Various Discount Factors ............................................................ 215 Table 90: Twin Parameter NPV (Post-tax) Sensitivity at a 5% Discount Rate (Revenue, Operating Costs) ...................................................................................................... 216 Table 91: Twin Parameter NPV (Post-tax) Sensitivity at a 5% Discount Rate (Revenue, Capital Expenditure) ............................................................................................... 216 Table 92: NPV (Post-tax) Relative to ZAR/4Eoz Basket Price at a 5 % Discount Rate ........... 217 Table 93: Adjacent Mines/Operations .................................................................................... 218 Table 94: Financial Assessment Accuracy .............................................................................. 219 Table 95: Kroondal - Rustenburg Reserves and LOM Balance .............................................. 221
1 1 Executive Summary 1.1 Introduction Sibanye-Stillwater Limited is an independent international precious metals mining company with a diverse mineral asset portfolio comprising platinum group metals (PGM) operations in the United States and Southern Africa, gold operations and projects in South Africa, and copper, gold and PGM exploration properties in North and South America. It is domiciled in South Africa and listed on the Johannesburg Stock Exchange (JSE or JSE Limited) and New York Stock Exchange (NYSE). This Technical Report Summary covers Sibanye-Stillwater's wholly-owned Rustenburg Operations in South Africa’s North West Province. The Rustenburg Operations fall under the PGM Operations of the Southern African Region of Sibanye Platinum Proprietary Limited, trading as Sibanye–Stillwater Group (Sibanye-Stillwater). The operations comprise integrated shaft complexes and processing plants. As per Group Methodology, the combined Sibanye Rustenburg Platinum Mines Proprietary Limited (SRPM) Mineral Resources and Mineral Reserves report 74% attributable. This report is the first Technical Report Summary for the Rustenburg Operations and supports the disclosure of the Mineral Resource and Mineral Reserve as at 31 December 2021. The Mineral Resource and Mineral Reserve were prepared and reported according to the United States Securities and Exchange Commission's (SEC's) Subpart 1300 of Regulation S-K. There has been no material change to the information between the effective date and the signature date of the Report. The effective date of the Mineral Resource and Mineral Reserve is 31 December 2021 and the Report date is 14 April 2022. 1.2 Property Description, Mineral Rights and Ownership The Rustenburg Operations are ongoing, established mines and ore processing plants extracting the Merensky and UG2 Reefs to produce PGMs and base metals. These are located in the North West Province, east of the towns of Rustenburg and Kroondal at latitude 25°40’S and longitude 27°20’E. The Rustenburg Operations are 123km west of Pretoria and 126km northwest of Johannesburg. The most direct routes to Rustenburg Operations include the N4 (dual carriage tarred road) from Pretoria or the R512 (regional dual carriage tarred road) from Johannesburg, which intersects with the N4. A further 6km on the R24 (dual carriageway) will take one to key areas within the Rustenburg Operations. The Rustenburg Operations Lease Area covers approximately 130km2 and is in excess of 20km from east to west and 15km from north to south. The area is characterised by relatively flat lands surrounded by the Magalies mountain range in the south and a number of small hills in the east. The Rustenburg Operations have the Mining Right (MR) No. NW30/5/1/2/2/82MR with the Department of Mineral Resources and Energy (DMRE). The MR is valid till 28 July 2040 in respect of a mining area totalling 15,352 hectares located in the Bojanala Platinum District Municipality, North West Province, South Africa. The current Life of Mine (LoM) plan used to support the Mineral Reserve continues to 2040. Renewal of the Mineral Right for an additional 30 years will be allowed closer to the date of expiry. There are no material legal proceedings in relation to the Rustenburg Operations. 2 The Mining Rights referred to in this document are issued in terms of the Mineral and Petroleum Resources Development Act 28 of 2002 in South Africa. The principal terms and conditions are not materially different from other similar operations in the Republic of South Africa. 1.3 Geology and Mineralisation The Bushveld Complex is approximately 2,060 million years old and is a mafic to ultramafic rock sequence. The Rustenburg Layered Suite (RLS) is the world’s largest known mafic igneous layered intrusion containing about 80% of the world’s known reserves of PGM’s (Crowson, 2001 quoted in Cawthorn, 2010). In addition to PGM’s, extensive deposits of iron, tin, chromium, titanium, vanadium, copper, nickel, and cobalt also occur. The Bushveld Complex extends approximately 450km east to west and approximately 250km north to south. It underlies an area of some 67,000km2, spanning parts of Limpopo, North West, Gauteng, and Mpumalanga Provinces. Interlayered in the Upper Critical Zone of the Bushveld Complex’s RLS, the Merensky and Upper Group No. 2 (UG2) Reefs are preserved as narrow tabular structures. The Rustenburg Operations are situated on the western limb of the Bushveld Complex and produce the PGMs and associated Base Metals from the mining and processing of the Merensky and UG2 Reefs. 1.4 Exploration Status, Development, Operations and Mineral Resource Estimates The discovery and development of the Merensky Reef in Rustenburg can be traced back to 1925. After intense exploration in the Rustenburg area , the first vertical shaft (West vertical was commissioned in 1928. The Klipfontein Plant (Phase 1) was also constructed in 1928. The Rustenburg Operations has been intensively explored by surface and underground exploration drilling, geophysical surveys (airborne magnetic and 3D seismics), trenching and geological mapping carried out over more than 55 years. This intensive exploration has proven the extension of the Merensky and UG2 Reefs to the north-northeast. Initial geological understanding of the area was developed from observations made from the surface and underground mapping, combined with exploration drillhole information and extrapolations of features observed in other platinum mines in the south-western Bushveld Complex. Current interpretations of the geological and structural framework applicable to the Merensky Reef and the UG2 Reef have evolved as new and more detailed geological information and datasets were obtained. The acquisition and recent re-processing of the 3D seismic data over most of the Rustenburg Operations Lease Area, when correlated with drillhole data, has provided a much higher level of confidence in the validity of these interpretations. There has been a significant decline in surface exploration drilling over the past five years, with a limited amount of surface exploration conducted on Bathopele Mine during 2015. No surface exploration drilling has been planned for 2022 (current budget timeframe). The Mineral Resource estimation process used at the Rustenburg Operations is based on surface and underground drillholes as well as underground channel samples. The most fundamental control of the PGM mineralization is rock chemistry. PGMs are associated with thin (1-5m) chromitite layers and base metals sulphides. These layers are distinct and consistent over 3 large distances. The Merensky Reef is the layer with the highest concentration of base metal sulphides and the highest concentration of PGMs followed by the UG2 Reef. The Mineral Resources declared are estimated based on the geological facies and constrained by appropriate geostatistical techniques, using Ordinary Kriging (OK) for areas with sufficient data and Inverse distance to the power of two (ID2) estimates for areas with limited data. The Mineral Resource classification follows geostatistical and geological guidelines. The Mineral Resources are declared inside the structural blocks and outside the mined-out areas. All Mineral Resources reported are considered to be of sufficient quality to justify a reasonable potential for economic extraction. The underlying grade control and reconciliation processes are considered appropriate. The facies and structural models that form the basis of this report have evolved. The Mineral Resources are in-situ estimates of tonnage and grades reported at a minimum mining width of 186cm, with applicable mechanised bord and pillar mining methods as employed at the Bathopele Shaft and a minimum mining width of 105cm, with applicable conventional scattered breast mining methods as employed at the Thembelani, Khuseleka and Siphumelele Shafts. 4 Table 1: Attributable Mineral Resources Exclusive of Mineral Reserves as at 31 December 2021 74% 2021 Classification – 4E PGM Tonnes (Mt) 4E Grade (g/t) 4E (Moz) Pt Pd Rh Au Pt Pd Rh Au 21-Dec 20-Dec 21-Dec 20-Dec 21-Dec 20-Dec (g/t) (g/t) (g/t) (g/t) (Moz) (Moz) (Moz) (Moz) Underground Measured (AI) 98.7 148.4 5.0 5.0 16.0 23.9 2.8 1.6 0.6 0.1 8.8 5.1 1.8 0.3 Measured (BI) 78.9 105.4 5.1 5.1 13.0 17.4 2.8 1.6 0.6 0.1 7.2 4.1 1.5 0.2 Indicated (AI) 45.0 59.2 5.1 5.1 7.4 9.7 2.8 1.6 0.6 0.1 4.1 2.4 0.9 0.1 Indicated (BI) 37.9 51.1 5.6 5.6 6.8 9.2 3.1 1.8 0.6 0.1 3.8 2.2 0.8 0.1 Total Measured and Indicated 260.6 364.1 5.2 5.2 43.2 60.2 2.8 1.6 0.6 0.1 23.8 13.7 5.0 0.8 Inferred (AI) 6.2 8.4 5.7 5.7 1.1 1.5 3.1 1.8 0.7 0.1 0.6 0.4 0.1 0.0 Inferred (BI) 4.8 6.5 5.5 5.5 0.8 1.1 3.0 1.7 0.6 0.1 0.5 0.3 0.1 0.0 Total Underground 271.7 379.0 5.2 5.2 45.2 62.9 2.8 1.6 0.6 0.1 24.9 14.3 5.2 0.8 Total (AI) 150.0 216.0 5.1 5.1 24.5 35.1 2.8 1.6 0.6 0.1 13.5 7.8 2.8 0.5 Total (BI) 121.7 163.0 5.3 5.3 20.7 27.8 2.9 1.7 0.6 0.1 11.4 6.6 2.4 0.4 Surface Tailings Facility Indicated TSF 0.0 0.0 - - 0.0 0.0 - - - - 0.0 0.0 0.0 0.0 Total Surface 0.0 0.0 - - 0.0 0.0 - - - - 0.0 0.0 0.0 0.0 Total Resource 271.7 379.0 5.2 5.2 45.2 62.9 2.85 1.64 0.59 0.10 24.9 14.3 5.2 0.8 1. Mineral Resources are not Mineral Reserves. 2. Mineral Resources have been reported in accordance with the classification criteria of Subpart 1300 of Regulation S-K. 3. Attributable Mineral Resources is 74% of the total Mineral Resource for 2021 and 100% for 2020. 4. Mineral Resource is calculated on available blocks. Due to non-selective mining, no cut-off grade is applied.AI = Above Infrastructure; BI = Below Infrastructure 5. Mineral Resources Reported after the removal of Geological losses. 6. Quantities and grades have been rounded to one decimal place; therefore, minor computational errors may occur. Values<0.5g/t at 0.5Moz report as zero.
5 Table 2: Attributable Mineral Resources Inclusive of Mineral Reserves as at 31 December 2021 at 74% 2021 Classification – 4EPGM Tonnes (Mt) 4E Grade (g/t) 4E (Moz) Pt Pd Rh Au Pt Pd Rh Au 21-Dec 20-Dec 21-Dec 20-Dec 21-Dec 20-Dec (g/t) (g/t) (g/t) (g/t) (Moz) (Moz) (Moz) (Moz) Underground Measured (AI) 193.5 261.3 4.7 4.8 28.9 40.3 2.6 1.5 0.5 0.1 15.9 9.2 3.3 0.5 Measured (BI) 78.9 105.4 5.1 5.1 13.0 17.4 2.8 1.6 0.6 0.1 7.2 4.1 1.5 0.2 Indicated (AI) 50.7 92.7 5.0 5.2 8.3 15.6 2.7 1.6 0.6 0.1 4.5 2.6 0.9 0.2 Indicated (BI) 37.9 51.1 5.6 5.6 6.8 9.2 3.1 1.8 0.6 0.1 3.8 2.2 0.8 0.1 Total Measured and Indicated 361.0 510.5 4.9 5.0 57.1 82.5 2.7 1.6 0.6 0.1 31.3 18.0 6.5 1.1 Inferred (AI) 6.2 12.9 5.7 5.6 1.1 2.3 3.1 1.8 0.7 0.1 0.6 0.4 0.1 0.0 Inferred (BI) 4.8 6.5 5.5 5.5 0.8 1.1 3.0 1.7 0.6 0.1 0.5 0.3 0.1 0.0 Total Underground 372.1 529.9 4.9 5.1 59.1 86.0 2.7 1.6 0.6 0.1 32.4 18.7 6.8 1.1 Total (AI) 250.4 366.9 4.7 4.9 38.4 58.3 2.6 1.5 0.5 0.1 21.0 12.1 4.4 0.7 Total (BI) 121.7 163.0 5.3 5.3 20.7 27.8 2.9 1.7 0.6 0.1 11.4 6.6 2.4 0.4 Surface Tailings Facility Indicated TSF 35.9 60.5 1.1 1.1 1.3 2.1 0.6 0.3 0.1 0.0 0.7 0.4 0.1 0.0 Total Surface 35.9 60.5 1.1 1.1 1.3 2.1 0.6 0.3 0.1 0.0 0.7 0.4 0.1 0.0 Total Resource 407.9 590.4 4.6 4.6 60.4 88.1 2.5 1.5 0.5 0.1 33.1 19.1 6.9 1.1 1. Mineral Resources are not Mineral Reserves. 2. Mineral Resources have been reported in accordance with the classification criteria of Subpart 1300 of Regulation S-K. 3. Attributable Mineral Resources is 74% of the total Mineral Resource for 2021 and 100% for 2020. 4. Mineral Resource is calculated on available blocks. Due to non-selective mining, no cut-off grade is applied.AI = Above Infrastructure; BI = Below Infrastructure 5. Mineral Resources Reported after the removal of Geological losses. 6. Quantities and grades have been rounded to one decimal place; therefore minor computational errors may occur. Values<0.5g/t or 0.5Moz report as zero. 6 1.5 Mining Methods, Ore Processing, Infrastructure and Mineral Reserves The Rustenburg Operations are large established PGM mines comprising three operating vertical shafts and two declines, six vertical shafts on care and maintenance, two plants processing underground ore, two plants processing tailings, two active tailings storage facilities and three inactive tailings storage facilities. All the permanent infrastructure required to access and mine is already established and in use. The mining methods employed at Rustenburg Operations vary between shafts and consist primarily of mechanised and conventional scattered breast mining methods. The conventional method incorporates in-stope crush pillars and regional pillars to maintain the stability of the workings. All pillar mining undergoes a continual risk assessment process and those areas that currently pose a risk are excluded from the Mineral Reserves. All mine designs, as well as strategic planning and major design issues, such as shaft pillar extraction, are done in conjunction with input from qualified rock engineers. The mining methods employed at Rustenburg are designed based on geotechnical engineering inputs bearing in mind the mining width, depth of mining and geology. Mine design is done in line with the mine and stability pillar design applicable to the area. Payability, stability pillars and geological features determine the extraction ratio, which will vary with depth across the mine. The LoM production plans for the Rustenburg Operations were developed through a Mineral Resource to Mineral Reserve conversion process that utilised dilution factors and mining (stoping and development) parameters as well as other modifying factors, informed by historical reconciliation results and performance. The use of factors aligned to historical performance enhances the likely achievability of the plans. Economic viability testing of the LoM plans demonstrated that extraction of the scheduled Measured and Indicated Mineral Resources is economically justified, and the declaration of Mineral Reserves is appropriate. There are five process plants located at Rustenburg Operations, namely: • Waterval UG2 concentrator, treating only UG2 ore (has an 82% 4E recovery factor) • Waterval Retrofit concentrator, treating a blend of Merensky and UG2 ores. This plant has an 84.06% recovery factor. • Chrome Retreatment Plant (‘CRP’). CRP treats UG2 rougher middlings to recover a saleable chromite concentrate. The plant has a 12.0% recovery factor. • Western Limb Tailings Retreatment Plant (WLTR plant) treats tailings from the Waterval West TSF with a 28.0% recovery factor. • Platinum Mile treats fresh and historic tailings and has a 12.0% recovery factor. There is adequate storage capacity for the tailings resulting from ore processing at the processing facility, and the Tailings Storage Facilities are in good condition. 7 Table 3: Attributable Mineral Reserves as at 31 December 2021 at 74% 2021 Classification - 4E PGM Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Pt Pd Rh Au Pt Pd Rh Au Dec 21 Dec 20 Dec 21 Dec 20 Dec 21 Dec 20 (g/t) (g/t) (g/t) (g/t) (Moz) (Moz) (Moz) (Moz) Underground Proved 83.4 106.1 3.5 3.7 9.5 12.7 1.9 1.1 0.4 0.1 5.2 3.1 1.2 0.1 Probable 6.0 4.5 4.2 4.4 0.8 0.6 2.3 1.3 0.5 0.1 0.4 0.3 0.1 0.0 Total Underground 89.4 110.5 3.6 3.7 10.3 13.3 1.9 1.2 0.4 0.1 5.6 3.3 1.3 0.2 Surface Stockpiles Proved (TSF) 0.0. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. Probable (TSF) 35.8 60.5 1.0 1.1 1.2 2.1 0.6 0.3 0.0 0.1 0.7 0.3 0.0 0.1 Total Surface 35.8 60.5 1.0 1.1 1.2 2.1 0.6 0.3 0.0 0.1 0.7 0.3 0.0 0.1 Total Proved 83.4 106.1 3.5 3.7 9.5 12.7 1.9 1.1 0.4 0.1 5.2 3.1 1.2 0.1 Total Probable 41.8 64.9 1.5 1.3 2.0 2.7 0.8 0.4 0.1 0.1 1.1 0.6 0.1 0.1 Total Reserve 125.1 171.0 2.9 2.8 11.5 15.4 1.6 0.9 0.3 0.1 6.3 3.6 1.3 0.2 1. Mineral Reserve was reported in accordance with the classification criteria of Regulation S-K 1300. 2. Attributable Mineral Reserves are 74% of the total Mineral Reserve for 2021 and 100% for 2020. 3. Mineral Reserve was estimated on all available blocks and no cut-off grade was applied. 4. Where Au grade is less than 0.05g/t the value will reflect as zero(0) in the table 5. Where Au is less than 0.05Moz the value will reflect as zero(0) in the table. 6. Mineral Reserves are estimated using the prices in Section 16.4. 7. The average recovery factors for Merensky and UG2 Reefs are 85%. 8 1.6 Capital and Operating Cost Estimates and Economic Analysis The LoM plans for Rustenburg Operations provide for appropriate Capital Expenditure budgets to cater for the sustainability of the operation. Sustaining capital costs are benchmarked to historical Capital Expenditure. The forecast Operating Costs included in the LoM plans are based on historical experience at the operations and a price risk of +/- 10% of the Basket price. All Capital Expenditure and Operating Cost estimates have been estimated to a maximum of +/-20% accuracy. Contingency for Operating Costs is 4%. The budgeted Capital Expenditure and Operating Costs forecast metal prices and other economic assumptions utilised for economic viability testing of the LoM plans are reasonable. The post-tax flows for Rustenburg Operations derive the Discounted Cash-Flow (DCF) which results in the Net Present Values (NPVs) of the LoM plan contained in the table below at Discount Rate as at 31 December 2021 of 5%. The table also indicates the sensitivity of the NPV to the long-term 4E PGM commodity price. Table 4: NPV (Post-tax) Relative to ZAR/4Eoz PGM Basket Prices at 5% Discount Rate- Current Operations Long Term Price (ZAR/4Eoz) Sensitivity Range -20% -10% -5% 27,228 5% 10% 20% NPV@ the base case Discount Rate 5% (ZARm) 8,035 28,570 38,837 49,105 59,372 69,640 90,175 Calculated at 100%, not attributable portion The table below shows the two-variable sensitivity analysis g the NPV Post-tax to the variance in Capital. Table 6 shows a two-variable sensitivity analysis of the NPV Post-Tax to variance in Revenue and in Operating Cost at the 5% Discount Rate. This demonstrates sensitivity to the increase in Operating Costs and the leverage potential to a higher 4E price. Table 5: Twin Parameter NPV (Post-tax) Sensitivity at a 5% Discount Rate (Capital Costs) _Current Operations Post-Tax NPV@5% Revenue Sensitivity Range (ZARm) -20% -10% -5% 0% 5% 10% 20% Capital cost sensitivity range -20% 8,821 29,356 39,623 49,891 60,158 70,426 90,960 -10% 8,428 28,963 39,230 49,498 59,765 70,033 90,568 -5% 8,231 28,766 39,034 49,301 59,569 69,836 90,371 0% 8,035 28,570 38,837 49,105 59,372 69,640 90,175 5% 7,839 28,373 38,641 48,908 59,176 69,443 89,978 10% 7,642 28,177 38,444 48,712 58,979 69,247 89,782 20% 7,249 27,784 38,052 48,319 58,586 68,854 89,389
9 Table 6: Twin Parameter NPV (Post-tax) Sensitivity at a 5% Discount Rate (Revenue, Operating Costs) _Current Operations Post-Tax NPV @ 5%(ZARm) Revenue Sensitivity Range -20% -10% -5% 0% 5% 10% 20% Total Operating Cost Sensitivity Range -20% 34,858 55,392 65,660 75,927 86,195 96,462 116,997 -10% 21,446 41,981 52,249 62,516 72,784 83,051 103,586 -5% 14,741 35,276 45,543 55,810 66,078 76,345 96,880 0% 8,035 28,570 38,837 49,105 59,372 69,640 90,175 5% 1,329 21,864 32,132 42,399 52,667 62,934 83,469 10% (5,376) 15,159 25,426 35,694 45,961 56,228 76,763 20% (18,787) 1,747 12,015 22,282 32,550 42,817 63,352 While the profitability of the entire operation is tested on a total cost basis, the point at which each individual shaft closure is determined is after direct operational cost. As soon as a shaft does not contribute to its own mining and operational cost, it is considered for closure. The direct allocated costs include the overheads specific to the operation while indirect allocated costs refer to those items which belong to the entire group and which are allocated back to each operation based on a formula. 1.7 Permitting Requirements The Rustenburg Operations have all the necessary rights and approvals to operate, e.g., mining, processing, TSFs, and ancillary facilities associated with the operations. Any permit and license infringements are corrected as they occur and environmental impacts are managed in close consultation with the appropriate departments. There are reasonable prospects that the operator’s tenure to operate on these premises is secure for the foreseeable future, unless terminated by regulatory authorities for other reasons. Furthermore, based on an assessment of the current permits, technical submittals, regulatory requirements and compliance history, continued acquisition of permit approvals should be possible. There is a low risk of rejections of permit applications by the regulatory agencies for the foreseeable future. 1.8 Conclusions and Recommendations The QPs have conducted a comprehensive review and assessment of all material issues likely to influence the future activities of the Rustenburg Operations based on information available up to 31 December 2021. There is a comprehensive Risk Register that is reviewed quarterly. All the risks have detailed mitigation plans designed to reduce the risk to a manageable level. The Qualified Persons could not identify any unmanaged material risks that would affect the Mineral Resources and Mineral Reserves reported for Rustenburg Operations. The views expressed in this report have been based on the fundamental assumption that the required management resources and proactive management skills will be focused on meeting the LoM plans and production targets. 10 There are no recommendations for additional work or changes. 11 2 Introduction 2.1 Registrant Sibanye-Stillwater Limited is an independent international precious metals mining company with a diverse mineral asset portfolio comprising platinum group metal (PGM) operations in the United States and Southern Africa, gold operations and projects in South Africa, and copper, gold and PGM exploration properties in North and South America. It is domiciled in South Africa and listed on the Johannesburg Stock Exchange (JSE or JSE Limited) and New York Stock Exchange (NYSE). This Technical Report Summary covers Sibanye-Stillwater’s Rustenburg Operations (Rustenburg or the Operations). Rustenburg falls under the PGM Operations of the Southern African Region of Sibanye Platinum Proprietary Limited, trading as Sibanye–Stillwater Group (Sibanye-Stillwater) (Figure 1). Rustenburg Operations include shafts, processing facilities and associated infrastructure (the Material Assets) located in the North West Province, South Africa. As per Group Methodology, the combined Sibanye Rustenburg Platinum Mines Proprietary Limited ( SRPM) Mineral Resources and Mineral Reserves are 74% Attributable to the registrant. Figure 1: Ownership and Company Structure for Rustenburg 100% 100% 74% 26% Sibanye Platinum Proprietary Limited Sibanye Stillwater Limited Sibanye Rustenburg Platinum Mines Proprietary Limited Newshelf 1335 Proprietary Limited Sibanye Gold Limited ThembelaniSiphumeleleBathopele Western Limb Tailings Retreatment Plant 12 2.2 Compliance Sibanye-Stillwater is listed on the NYSE (Code SBSW) and the JSE (Code SSW). Mineral Resources and Mineral Reserves contained in this Technical Report Summary were compiled and reported following the United States Securities and Exchange Commission's (SEC's) Subpart 1300 of Regulation S-K. 2.3 Terms of Reference and Purpose of the Technical Report This Technical Report Summary for the Sibanye-Stillwater Rustenburg Operations reports the Mineral Resources and Mineral Reserves as at 31 December 2021. The Rustenburg Operations are ongoing, established mines and ore processing facilities extracting platinum group metals (PGMs) from the Merensky Reef (Merensky) and the Upper Group 2 Chromitite Seam (UG2 Reef) of the Bushveld Complex. It also extracts chrome from the UG2 Reef as a by-product. The ore is processed onsite to produce PGM and base metal concentrate. The concentrate is further beneficiated at the Waterval Complex smelter and refinery owned by Anglo American Platinum Ltd and situated in Rustenburg. This report is the first Technical Report Summary for the Sibanye-Stillwater Rustenburg Operations prepared under the SEC's Subpart 1300 of Regulation S-K disclosure requirements. The PGM rich layers mined are well known from extensive mining which has taken place, at Rustenburg and the greater Bushveld Complex, over the last 90 years. The Mineral Resource for Rustenburg contained in this Technical Report Summary is estimated from the extensive surface and underground drillhole and sampling database and is signed-off by internal Qualified Persons (QP). These Mineral Resources are the basis for the Mineral Reserve estimates reported for the operation. Furthermore, the Mineral Reserve estimates are based on detailed Life of Mine (LoM) plans and technical studies (at least to a Prefeasibility Study level) completed internally by Sibanye-Stillwater personnel utilizing modifying factors and Capital and Operating Costs informed by the historical performance at the operations. This Technical Report Summary was compiled by in-house QPs for Mineral Resources and Mineral Reserves appointed by Sibanye-Stillwater. The QPs are Technical Experts/Specialists registered with professional bodies that have enforceable codes of conduct (Table 7).
13 Table 7: Details of QPs Appointed by Sibanye-Stillwater Name Position Area of Responsibility Academic and Professional Qualifications Section Sign- off Andrew Brown Vice President: Mine Technical Services Qualified Person, Mineral Resources and Mineral Reserves – SA PGM Operations MSc Mining Engineering; FSANIRE F037 MSAIMM 705060 1-6, 15 Manie Keyser Senior Manager Mine Planning and Resource Management Qualified Person, Mineral Resources and Mineral Reserves – SA PGM Operations MEng Mining Engineering, GDE, NHD MRM, ND Survey SACNASP 400284/06 13,16, 17.1-17.4, , 20-25 Nicole Wansbury Unit Manager Geology Mineral Resources Qualified Person Mineral Resources – SA PGM Operations MSc Geology SACNASP 400060/11 GSSA No 965108 1.4,7-11 Brian Smith Unit Manager Survey Qualified Person Mineral Reserves – SA PGM Operations MEng MRM SAGC GPr MS 0218 1.5, 12 Stephan Botes Unit Manager – Surface and Mineral Rights Mineral Title LLB, LLM, Postgraduate Certificate in Prospecting and Mining Law, Postgraduate Certificate in Company Law I, Admitted Attorney of the High Court of RSA 1.7, 3.2,3.4 Mandy Jubileus Environmental Manager SA PGM Environmental Compliance MSc Environmental Management and Sciences , SACNASP 118956, SAATCA ISO14001 Lead Auditor E2167 17.5 Dewald Cloete SVP Processing Mineral Processing ND , NHD Extractive Metallurgy, SAIMM HD0968 14 Roderick Mugovhani SVP Finance Financial Evaluation B,Comm Accounting, Post Graduate Diploma in Acc Education, MBA, Executive Management Programme, Certified Professional Accountant( SA. Management Development Programme ( MDP) 1.6, 18, 19 SAIMM - South African Institute of Mining and Metallurgy SACNASP – South Africa Council for Natural Scientific Professions SAGC – South African Geomatics Council GSSA – Geological Society of South Africa SAATCA – South African Auditor and Training Certification Authority 14 2.4 Sources of Information Sibanye-Stillwater (the registrant) provided most of the technical information utilised for the preparation of this report. This information is contained in internal documents recording various technical studies undertaken in support of the current and planned operations, historical geological work and production performance at the Rustenburg Operations and forecast economic parameters and assumptions. Other supplementary information was sourced from the public domain and these sources are acknowledged in the body of the report and listed in the References Section (Section 24). 2.5 Site Inspection by Qualified Persons The QPs for Mineral Resources and Mineral Reserves who authored this Technical Report Summary, and the supporting Technical Experts/Specialists are all employees of Sibanye-Stillwater. By virtue of their employment, the QPs visit the Rustenburg Operations regularly while carrying out their normal duties. 2.6 Units, Currencies and Survey Coordinate System In the Republic of South Africa (RSA) metric units are used for all measurements and, therefore, the reporting of quantities is in metric units, unless otherwise stated. All the metal prices and costs are quoted in US Dollars (USD) or South Africa Rand (ZAR). An Exchange rate of 15.00ZAR/USD has been used in this document. The coordinate system employed for most of the surface and underground surveys and maps shown in this report is based on the Gauss Conform Projection (UTM), Hartebeeshoek 94 Datum, Ellipsoid WGS84, Central Meridian WG27 (Y +0; X+2 800 000). Some regional scale maps in this report may be referenced with Latitude and Longitude coordinates for ease of reading. Units of measurement used in this report are described in Table 8. Table 8: Units Definitions Units Description cm centimetre(s) g gram(s), measure of mass g/cm3 density - grammes per cubic centimetre g/t grams per tonne g/t grade grams per tonne ha hectares = 100m x 100m kg kilograms = 1000grams, measure of mass km kilometre(s) = 1000 metres km2 square kilometres, measure of area 15 Units Description Koz or kozt kilo ounces= 1000 ounces (troy) kt kilotonnes ktpm kilotonnes per month litre Metric unit of volume = 1000cm3 m metre(s) m2 square metres m3/a cubic metres per annum mamsl elevation metres above mean seal level metre metric unit of distance mm millimetre(s) = metre/1000 Moz Million ounces (troy), measure of weight Mt Million metric tonnes Mtpa Million tonnes per annum MVA Million Volt-Amps(Watts) MW Megawatts oz Troy ounces = 31.1034768 grams ppb parts per billion ppm parts per million (grams/metric tonne) sec second t metric tonne = 1000 kilograms = 1.10231131 short ton tonnes metric tonnes = 1000 kilograms = 1.10231131 short ton USD United States Dollars 4Eoz troy ounces of Platinum, Palladium, Rhodium and Gold combined. lb pound USA = measure of weight WGS84 World Geographic System 1984- map projection system wt% weight percent ZAR South African Rand ZARm Million Rand 2.7 Reliance on Information Provided by Other Experts The QPs for Mineral Resources and Mineral Reserves have sought input from in-house Technical Experts/Specialists on aspects of the modifying factors for the disciplines outside their expertise. Kroondal 16 is a large operation, and it is not possible for any one person to have the required expertise to comment on all aspects of the operation and inputs to the Mineral Resources and Mineral Reserves. Kroondal and Sibanye-Stillwater employ a large team of Technical Experts and Services Specialists. The QPs consider it reasonable to rely upon the information provided by these experts by virtue of their role in the company. A list of the in-house Technical Experts/Experts and their areas of competency are summarized in Table 9. Table 9: Technical Experts/Specialists Supporting the QPs Name Position Area of Competency Academic Qualifications Braam Burger Manager Finance Financial Evaluation B.Com (Accounting and Information Science) R Craill Vice President: Engineering Infrastructure B. Eng Mechanical. Pr Eng R Cooper Vice President Tailings Engineering Tailings BSc Civil Engineering, GDE (Civil), Pr Eng S Durapraj Manager: Rock Engineering Rock Engineering B.A, MSc Mining Engineering, MSANIRE, AREC, COMRMC L Koorsse Unit Manager Survey Survey, Reporting and Historical Mining Factors MSCC, NHD Mine Survey, GDE Mining Eng, IMSSA PMS0134 G Mackenzie Manager: Human Resources Human Resources Management Nat Dipl. HRM. Adv. IR E Malherbe Superintendent Geology Mineral Resource Estimation BSc (Hons) (Geology) SACNASP 400131/08 T Naude Unit Manager: Environment Rehabilitation and closure costs BA Geography and Environmental Studies M Neveling Senior Manager: Health and Safety Safety MO COC, MMDP, Ncert Safety H Olivier Manager Asset Management Equipment B. Eng. Mechanical (Hons), GCC: Mines & Works (5999). K Pillay EVP: Sales and Marketing Metal sales and Marketing BSc Eng (Chem), MSc Eng (Chem), MBA. T Phumo Executive Vice President (EVP): Stakeholder Relations (SA) Social and Labour BA Hons (Corp Comm), APR Diploma Project Management S Swanepoel Manager Occupational Hygiene and Ventilation Occupational Hygiene, Ventilation BSc.(Hons), MSc, MEC, NDSM, SAIOH (0309)
17 3 Property Description 3.1 Location and Operations Overview The Rustenburg Operations are located in the North West Province, east of the towns of Rustenburg and Kroondal at latitude 25°40’S and longitude 27°20’E. Rustenburg Operations is 125km west of Pretoria and 127km northwest of Johannesburg (Figure 2). The Rustenburg Operations footprint is in excess of 20km from east to west and 15km from north to south. Figure 2: General Location of the Material Assets as at 31 December, 2021 18 Rustenburg town is surrounded by agricultural land. Various mines owned by Impala Platinum, Glencore and Royal Bafokeng are also situated in and around Rustenburg. Refer to Figure 3 and Figure 4 for maps providing additional location details of Rustenburg. The assets of Rustenburg Operations, which includes shafts, processing facilities and associated infrastructure (the “Material Assets”), are located in the Northwest Province, South Africa. This Technical Report Summary for the Sibanye-Stillwater Rustenburg Operations reports the Mineral Resources and Mineral Reserves as at 31 December 2021. The Rustenburg Operations comprise: • Three operating vertical shafts, • Two declines operating, • Six vertical shafts on care and maintenance, • Two plants processing underground ore, • Two plants processing tailings, • Two active Tailing Storage Facilities (TSFs), and • Three inactive TSFs. The Mineral Resource is accessed from the surface using conventional underground mining methods to 34 level (the deepest working level) at Siphumelele Shaft, approximately 1,350m below surface, and 28 Level (the deepest working level) at Khuseleka, approximately 950m below surface, and 29 Level (the deepest working level) at Thembelani Shaft. The Mineral Resource at Bathopele Mine is accessed from the surface via two decline clusters using mechanised mining methods to a depth of approximately 500m below the surface. Mining and mineralisation over the Rustenburg Operations Lease Area are shown in Figure 3. 19 Figure 3: Rustenburg Operations 20 3.2 Mineral Title The Mining and Prospecting rights referred to in this document are issued in terms of the Section 5(1) of the Mineral and Petroleum Resources Development Act 28 of 2002 in South Africa. The principal terms and conditions are not materially different to other similar operations within South Africa. The Rustenburg Operations are contained within one converted Mining Right. The Mining Right detail is given in Table 10 and Figure 4. Mining Right covers approximately 15,351.7636ha and is in excess of 20km from east to west and 15km from north to south The Mining Right comprises various farms (or portions thereof). The names of the farms for the Rustenburg Operations are listed in Table 11. The Rustenburg Operations have sufficient rights and access to land to conduct operations. It is noted that the LoM plan extends beyond the expiry date of the Mining Right. SPRM will be able to apply for an additional 30years closer to the expiry date of the current Mining Right. There is no reason to believe this will not be granted.
21 Table 10: Summary of Mineral Rights held for the Rustenburg Operations Right Holder Right Number/s Size (ha) Minerals Key Permit Conditions Expiry date Future Requirements Future Intentions Brief summary of Violations/ fines Sibanye Rustenburg Platinum Mines (Pty) Ltd NW30/5/1/2/2/82MR 2,624.98 PGMs & Precious & Base Metals in UG2 and Merensky Reef (only PGMS over the entire MR) See the summary of permit conditions, general EMP regulatory reporting requirements and SLP regulatory reporting requirements. 28-Jul-40 Application to be submitted in terms of section 102 for consent to incorporate various areas into mining right. To include areas covered by two Prospecting rights (Portion of Paardekraal 279 JQ and portion of Waterval 306 JQ). To combine into a bigger mining right with the Kroondal MRs None. Rustenburg Platinum Mines Limited (Anglo owned) NW30/5/1/2/2/80 MR 3 212.93 PGMs and associated minerals See the summary of permit conditions, general EMP regulatory reporting requirements and SLP regulatory reporting requirements. 28 Jul 40 None None None 22 Key permit conditions are given below: 1. Mining right renewal applications to be submitted 60 working days prior to the date of expiry of the right. 2. Holder of MR must continue with mining operations, failing which the right may be suspended or cancelled. 3. The terms of the right may not be varied or amended without the consent of the Minister of Mineral Resources and Energy. 4. The Holder shall be entitled to abandon or relinquish the right, or the area covered by the right entirely or in part. Upon abandonment or relinquishment, the Holder must: 4.1. Furnish the Regional Manager with all prospecting and/or mining results and/or information, as well as the general evaluation of the geological, geophysical and borehole data in respect of such abandoned area; and 4.2. Apply for a closure certificate in terms of section 43(3) of the MPRDA. 5. The holder shall pay royalties to the State in accordance with section 25(2)g of the MPRDA throughout the duration of the mining right. 6. Mining Operations must be conducted in accordance with the Mining Work Programme and any amendment to the MWP and an approved EMP. 7. The holder shall not trespass or enter into any homestead, house or its curtilage nor interfere with or prejudice the interests of the occupiers and/or owners of the surface of the Mining Area except to the extent to which such interference or prejudice is necessary for the purposes of t enabling the Holder to properly exercise the Holder’s rights under the mining right. 8. The holder must dispose of all minerals derived from mining at competitive market prices which shall mean in all cases, non-discriminatory prices or non-export parity prices. 9. A shareholding, an equity, an interest or participation in the mining right or joint venture, or a controlling interest in a company/JV may not be encumbered, ceded, transferred, mortgaged, let, sublet, assigned, alienated or otherwise disposed of without the written consent of the Minister, except in the case of a change of controlling interest in listed companies. 10. All boreholes, shafts, adits, excavations and openings created by the holder shall be sealed, closed, fenced and made safe in accordance with the approved Environmental Management Programme and the Mine Health and Safety Act. 11. The holder of the mining right, while carrying out mining operations should safeguard and protect the environment, the mining area and any person using to entitled to use the surface of the mining area for possible damage or injury. 23 12. The Minister or a person authorized by the Minister shall be entitled to inspect the Mining Area and the execution of the approved mining right conditions. 13. A mining right may be cancelled or suspended subject to S47 of the MPRDA if the holder: 13.1. Submits inaccurate, incorrect and/or misleading information in connection with any matter required to be submitted under this Act; 13.2. fails to honor or carry out any agreement, arrangement or undertaking, including the undertaking made by the Holder in terms of the Broad Based Socio Economic Empowerment Charter and Social and Labour Plan; 13.3. Breaches any material term and condition of the mining right; 13.4. Conducts mining in contravention of the MPRDA; 13.5. Contravenes the requirements of the approved Environmental Management Programme; 13.6. Contravenes any provisions of this Act in any other manner. 14. The holder shall submit monthly returns contemplated in S 28 (2) A of the MPRDA no later than the 15th of every month and maintain all such books, plans and records in regard to mining on the mining area as may be required by the Act. 15. The Holder shall, at the end of each year, following commencement of this mining right, inform the Regional Manager in writing of any new developments and of the future mining activities planned in connection with the exploitation/mining of the minerals in the mining area. 16. Provisions relating to section 2(d) and section 2(f) of the MPRDA, relating to the Broad Based Socio Economic Empowerment Charter differs in each mining right. 17. The Mining right does not exempt the holder from complying with the MHSA or any Act in South Africa. 18. Annually, no later than three months before financial year end submit a detailed implementation plan to give effect to Regulation 46(e)(i), (ii) and (iii) in line with the Social and Labour Plan. 19. Annually, no later than three months after finalization of its audited annual report submit a detailed report on the implementation previous year’s SLP. SLP COMPLIANCE REQUIREMENTS 20. New Social and Labour Plan to be submitted and reviewed every 5 years. 21. Social and Labour Plan Implementation Plans to be submitted annually. 22. Social and Labour Plan Annual Report to be submitted annually. 24 ENVIRONMENTAL MANAGEMENT COMPLIANCE REQUIREMENTS 23. Performance assessment relating to Environmental Management Programme to be conducted Bi- annually. 24. Performance assessment relating to Water Use License to be conducted annually. 25. Performance assessment relating to Atmospheric Emission License to be conducted annually. Figure 4: Plan Showing Mineral Right
25 Table 11: Mining Right Status of the Rustenburg Operations FARMS REGISTERED IN THE NAME OF SIBANYE RPM PTY LTD Farm Name Portion Magisterial District Paaredekraal 279 JQ RE*27, RE*28,78,111,114,119,120,122,123,124,125 Rustenburg Hoedspruit 298 JQ 19 Rustenburg Brakspruit 299 JQ 23,RE*12,19,20 Rustenburg Klipfontein 300 JQ RE*4,RE*5 Rustenburg Waterval 303 JQ REMAINDER,3 RE*5,RE*6,7,RE*8,RE*9,RE*10,RE*13,RE*14,19,RE*48,RE*49,51,54,79,84,87 Rustenburg Kroondal 304 JQ RE*76,RE*85,RE*122,132,RE*145,RE*167,RE*170,172,149,150, 159,164,165,166,168,169,171,173,174,185,221,241,242 Rustenburg Waterval 306 JQ RE*2 Rustenburg Spruitfontein 341 JQ 101 Rustenburg Farm 342 JQ RE*1,42,RE*54,RE*55,56,57,58,59,60,61,62,63,64,RE*66,70,71,72,RE*73 79,88,89,94,95,115,121,124,125,RE*127,128,129,130,RE*160,161, 162,163,164,171,RE*172,178,180,367,RE*194,198,RE*199,RE*200,201,204,24 5,246,247,248,249,271,272,273,287,290,291,300,325,333,339,340,RE*345,34 9,RE*363,364 Rustenburg Anglo Tailings 942 JQ Anglo Tailings 942 JQ Rustenburg 3.3 Royalties Sibanye-Stillwater Rustenburg Operation is not a royalty company nor receives royalties from any other operation. 3.4 Legal Proceedings and Significant Encumbrances to the Property The QPs have been advised by Sibanye-Stillwater that there are no material legal proceedings in relation to the Rustenburg Operations. It should, however, be noted that Sibanye-Stillwater may be involved in various non-material legal matters such as employment claims, third-party subpoenas and collection matters on an ongoing basis, which are not material to the Mineral Resources and Mineral Reserves reported for the Rustenburg Operations in this Technical Report Summary. From the documentation reviewed and input by the relevant Technical Specialists and Experts, the QPs could not identify any material factors or risks with regards to the title permitting, surface ownership, environmental and community factors that would prevent the mining of the reefs and the declaration and disclosure of the Mineral Resources and Mineral Reserves for the Rustenburg Operations. 26 4 Accessibility, Climate, Local Resources, Infrastructure and Physiography 4.1 Topography, Elevation and Vegetation The Rustenburg area within which the Rustenburg Operations are situated is characterised by undulating terrain, varying between 1,050m to 1,180m above mean sea level. The topography to the north, west and east of Rustenburg Operations is dominated by well-established non-perennial watercourses. The topography for the mine area is relatively flat with sporadic hillocks and rocky outcrops. Situated to the south of the mine area is the Magalies mountain range and to the east, a number of small hills. The major rivers in the Rustenburg Operations area include the Hex River bisecting the western and central sections of the licence area and the Sterkstroom River on the eastern perimeter. The natural vegetation comprises open grasslands and shrubs, but most of the area surrounding Rustenburg has been and is to a certain extent still used for agriculture developments, in particular sunflowers and tobacco. With the growth in the mining sector due to extensive platinum and chrome deposits in the region, agriculture is on the decline. Urban development has taken place mainly in the town of Rustenburg, but informal settlements also exist, including in the Rustenburg Operations Lease Area. The licence area comprises two primary vegetation types, namely: • Clay Thorn bushveld/ Other Turf Thornveld o This veld type occurs on the black vertic clay soils of the flat plains of the North West and Northern Provinces. Acacia tortilis, Acacia karroo and Acacia nilotica dominate the tree layer within this vegetation type. The Clay Thorn Bushveld is the main veld type found within the Rustenburg Operations area. • Mixed Bushveld o This veld type is very variable depending on soil type, soil depth and aspect, and is represented by many different plant communities and habitat types. It occurs mainly on the undulating to flat plains of the Northern and North West Provinces. The soil is mostly shallow, sandy, sometimes coarse and gravelly, overlying granite, quartzite, sandstone or shale. The vegetation may vary from short, dense, sometimes shrubby bushveld to tall, open tree savanna. Mixed Bushveld occurs in small parts of the Rustenburg Operations licence area. 4.2 Access, Towns and Regional Infrastructure The Rustenburg Operations are situated near Rustenburg town in the North West Province of South Africa. The site is accessed via the multiple networks of well-maintained tarred roads. The operations are accessed via the N4 highway into Rustenburg town, then the R24 to the Operations from Pretoria. From Johannesburg, Rustenburg town is accessed via the R24 road passing through Magaliesburg or 27 the R512 (regional dual carriage tarred road) from Johannesburg, which intersects with the N4. Refer to Section 4.4 and 15 and Figure 2. 4.3 Climate Rainfall occurs throughout the year, but predominantly between November and March, mainly as thunderstorms. Annual rainfall averages approximately 650 mm. The wettest month is January, with an average monthly total rainfall of 132 mm. The driest month is July, with an average monthly total rainfall of approximately 2 mm. Mean annual air temperatures range from 11.8°C in June/July to 23.8°C in January. Average daily maxima range from 20.4°C to 30.3°C, and minima from 2.8°C to 17.2°C. Winds are mainly light to moderate and blow from the north-easterly sector, except for short periods during thunderstorms or weather changes when they have a southerly component. The lightning ground flash density in the area is a moderate risk to surface infrastructure with between 5 to 7 strikes/km2/year (on a scale of 0 to 19). No severe climatic effects influence mining activities and the mining and ore processing operations at the Rustenburg Operations proceed year-round. 4.4 Infrastructure and Bulk Service Supplies Rustenburg Operations and the surrounding mines have been operational for decades. The regional and onsite infrastructure for mining and ore processing is well established. There is a good supply chain for all required consumables and equipment in or near the mine site. The Rustenburg Operations, through Sibanye-Stillwater, is well connected to the international supply markets for any materials and equipment not available locally. The Rustenburg Operations are supplied with bulk electricity from the regional grid, which is owned and operated by the state-owned company, Eskom. Details for Power are supplied in Section 15.3 and for Water supplies in Section 17.5.6. Rustenburg Municipality and the neighbouring Madibeng Municipality host a combined population of greater than 1.2m people and most services needed are found in the surrounding towns and cities. 4.5 Personnel Sources Rustenburg Operations have specific policies, procedures and practices in place, which address, on an integrated basis, its human resource requirements. Recruitment is predominantly informed by the operational requirements of the Rustenburg Operations for specific skills, by the extent of labour turnover levels and by relevant legislation. The organizational structure currently in place, together with operational management, will remain unchanged until planned shaft closures occur, following which downsizing will be assessed. Organizational structures and staffing requirements (Table 12) are primarily determined by operational requirements and the production profile of the operation. The economic climate, cost infrastructure and the Mineral Reserves profile also influence the organizational structures and required labour complement. 28 Table 12: Number of Permanent Employees C2018 C2019 C2020 C2021 No. of Employees 12,843 12,697 12,365 12,709 Manpower is sourced from different areas of South Africa and beyond, although preference is given to manpower from local communities within the Northwest Province in support of local economic development. Table 13 provides a breakdown of the origin of employees as per province, including beyond the border of South Africa. Many of the Rustenburg Operations’ employees live in Rustenburg and neighbouring towns. Table 13: Origin of Employees Province Number of Permanent Employees Number of Contractors Percentage Eastern Cape 3,486 493 25.02% Free State 343 91 2.73% Gauteng 541 268 5.09% KwaZulu-Natal 161 79 1.51% Limpopo 706 390 6.89% Mpumalanga 173 87 1.63% North West 5,085 1,662 42.42% Northern Cape 124 32 0.98% Western Cape 8 1 0.06% Non-South Africans 2,082 93 13.67% Total 12,709 3,196 100.00%
29 5 History 5.1 Ownership History The Rustenburg operations were started in 1925 by Anlo American Platinum until the acquisition by Sibanye -Stillwater in 2016. The historical development of the Rustenburg Operations is summarized in Table 14. Table 14: Historical Development Company/ Ownership/ Operator Date Activity Anglo American Platinum 1925 Exploration on the Eastern Limb of the Bushveld Complex started as far back as 1925. Exploration was carried out by renowned explorer Hans Merensky. Hans discovered platinum mineralisation in pyroxenite. Anglo American Platinum 1929 The 1st vertical Shaft at Rustenburg Section – West vertical Shaft Anglo American Platinum 1935 Waterval Vertical Shaft constructed Anglo American Platinum 1951 Central deep Shaft constructed Anglo American Platinum 1953 Siphumelele 3 Shaft and West 20 compressor station constructed Anglo American Platinum 1961 Siphumelele 2 Shaft commissioned Anglo American Platinum 1967 Frank Concentrators commissioned Anglo American Platinum 1968 Khomanani Shaft commissioned Anglo American Platinum 1970 Thembelani 1 mine commissioned Anglo American Platinum 1972 Khuseleka 1 mine commissioned Anglo American Platinum 1978 Siphumelele 1 mine commissioned Anglo American Platinum 1984 Khuseleka 2 Shaft commissioned Anglo American Platinum 1993 Khomanani 2 Shaft commissioned Anglo American Platinum 2013 Thembelani 2 Shaft sinking Sibanye-Stillwater 2016 Sale of Rustenburg Operations to Sibanye on 1 November 2016. At the point of sale Thembelani 2, Khomanani 1 &2 , Khuseleka 2 and Siphumelele 2 &3 were all on care and maintenance. Sibanye-Stillwater 2017 The full operational period under Sibanye-Stillwater with consistent delivery in all metrics. Sibanye-Stillwater 2018 7% improvement in operating margin year-on-year. Sibanye-Stillwater 2019 19% improvement in operating margin year-on-year. Sibanye-Stillwater 2020 The Covid-19 Pandemic and the associated national lockdown affected all production from April to the middle of May, at which point a gradual build-up in production was initiated with a slow return of employees continuing right up into December 2020. Sibanye-Stillwater 2021 Optimisation of mine boundaries between Bathopele (SRPM), K6 and Kopaneng (Kroondal) and deepening of the Kroondal East complex (Kopaneng and Bambanani) into Siphumelele(SPRM) ground to extended LoM for Kroondal with Rustenburg Mineral Reserves, as part of the new agreement between AAP and SSW. 30 5.2 Previous Exploration and Mine Development 5.2.1 Previous Exploration The discovery and development of the Merensky Reef in Rustenburg can be traced back to 1925. After intense exploration in the Rustenburg area, the first vertical shaft (West vertical was commissioned in 1928. The Klipfontein Plant (Phase 1) was also constructed in 1928. The Rustenburg Operations have been intensively explored by surface and underground exploration drilling, geophysical surveys (airborne magnetic and 3D seismic), trenching and geological mapping carried out over a period of more than 55 years. This intensive exploration has proven the extension of the Merensky and UG2 Reefs to the north-northeast. Initial geological understanding of the area was developed from observations made from the surface and underground mapping, combined with exploration drillhole information and extrapolations of features observed in other platinum mines in the south-western Bushveld Complex. Current interpretations of the geological and structural framework applicable to the Merensky Reef and the UG2 Reef have evolved as new and more detailed geological information and datasets were obtained. The acquisition and recent re-processing of the 3D seismic data over most of the Rustenburg Operations Lease Area, when correlated with drillhole data, has provided a much higher level of confidence in the validity of these interpretations. However different levels of confidence are applicable to different areas, reflecting the amount of mining or exploration work undertaken, and additional exploration drilling will be necessary in some areas to increase confidence in resource modelling ahead of future development beyond the current LoM. There has been a significant decline in surface exploration drilling over the past five years, with a limited amount of surface exploration conducted by Sibanye-Stillwater on Bathopele Mine during 2015. However, exploratory visits are conducted in previously mined areas to confirm structure and facies. 5.2.1.1 Aeromagnetic Surveys The entire Rustenburg Operations area has been covered by a high-resolution helicopter borne aeromagnetic (‘AM’) and radiometric surveys, carried out in late 2002 and early 2003 by Fugro Airborne Surveys, on behalf of Anglo-American Platinum, at a line spacing of 50m and a sensor clearance of 20m with results. Various image processing techniques were used to enhance and aid interpretation of this data and, as shown in Figure 5 this allowed interpretation of major northwest- southeast structural trends and east-west striking faults. In addition, two dominant trends of magnetically susceptible dykes have been recognised; the northwest-southeast striking positively and negatively magnetized dolerite dykes as well as the east-west trending dolerite dykes. The AM data has also assisted with the identification of dunite pipes as well as potential IRUP areas. The QPs’ experience at the Rustenburg Operations has however shown that the dimensions of actual Iron-rich replacement pegmatites (IRUP) at the Merensky Reef and UG2 Reef elevations are commonly smaller than the dimensions of the associated magnetic anomaly. Consequently, the actual IRUPs have a smaller impact on geological losses than suggested by the AM data. Also apparent is the magmatic layering of Bushveld stratigraphy as an indication of the strike of the strata. 31 Figure 5: Aeromagnetic Image Over Rustenburg Operations. 5.2.1.2 3D Seismics Between 2003 and 2007, three 3D seismic surveys were completed across the Rustenburg Operations Lease Area and adjacent regions, with data acquisition undertaken by Compagnie Generale de Geophysique (CGG), a French based company, on behalf of Anglo-American Platinum. The 2003 seismic survey was a low-resolution regional survey of the Rustenburg area, while the 2005 seismic survey on the Paardekraal (now Thembelani Mine area) and 2007 seismic survey on the Rustenburg Deeps area (Siphumelele and Khomanani Mines) were high resolution surveys. These seismic surveys were merged and re-interpreted during the 2007 campaign while also integrating new drillhole information from all areas across the Rustenburg Operations Lease Area. 32 Modelling and interpretation of the merged seismic datasets were carried out by Rock Deformation Research Limited (RDR), a company contracted by Anglo-American Platinum. Although the Merensky Reef and UG2 Reef could not be imaged directly, close approximations are provided by near reef reflectors which are laterally persistent and stable across the Rustenburg Operations Lease Area. The modelled UG2 Reef and Merensky Reef surfaces show a very good correlation with drillhole control. The seismic surveys contributed important and precise identification and confirmation of structural patterns and faults, geometry of economic horizons, major/regional depression-like features and larger potholes. This information is of great value in the computation of fault throws, geological reef losses and also provides detailed insights into stratigraphic variations across the property. Isopach estimations for various units show a very good correlation with drillhole observations and give confidence that the seismic widths interpreted indicate real geological variation. This also suggests that the seismic data can be used to support drillhole isopach estimates in areas of low-density drillhole coverage. However, as the seismic model is calibrated to drillhole intersections, the accuracy of predicted elevations tends to diminish away from drillhole control. 5.2.2 Previous Development Production commenced at Rustenburg in 1929, following the completion of shaft sinking. The history of other shafts is listed in Table 14. Refer to Table 15 for details of the historical production and financial parameters in calendar years (C), C2017 to C2021. Table 15: Historical Production and Financial Parameters Unit Financial Years C2017 C2018 C2019 C2020 C2021 Main development (1) Advanced (km) 20 24 23 16 23 Area mined (1) (’000m2) 1,371 1,328 1,258 945 1,123 Tonnes milled (2) Underground (’000) 7,098 7,113 6,995 5,404 6,341 Surface (’000) 5,885 5,749 4,384 5,056 5,712 Total (’000) 12,983 12,862 11,379 10,460 12,053 BUHG (3) Underground (g/t) 3.70 3.60 3.48 3.38 3.38 Surface (g/t) 1.53 1.18 1.16 1.02 1.07 Combined (g/t) 2.72 2.52 2.59 2.24 2.29 4E produced Underground (Moz) 0.72 0.70 0.65 0.50 0.60 Surface (Moz) 0.09 0.08 0.05 0.58 0.07 Total (Moz) 0.81 0.78 0.70 0.56 0.67 Operating Costs(4) Underground (ZAR/t) 1,167 1,171 1,289 1,599 1,643 Surface (ZAR/t) 133 84 247 210 195 Total (ZAR/t) 698 685 888 928 957 Operating Costs (USD/oz) 842 855 1,001 1,050 1,160
33 Unit Financial Years C2017 C2018 C2019 C2020 C2021 (ZAR/kg) 11,199 11,328 14,480 17,280 17,151 All in cost(6) (USD/oz) 793 804 998 1,131 1,248 (ZAR/kg) 10,554 10,643 14,432 18,624 18,460 Capital Expenditure (ZARm) 831 792 819 743 1,248 *Management of Rustenburg Operations was taken over in mid-2016. Prior to 2018 the reporting KPI’s were different, and this information is not available. 1. Main development and area mined come from Khuseleka, Thembelani, Bathopele and Siphumelele shafts. 2. Tonnes Milled are from all operating shafts and opencast operations operational at the time of reporting. 3. The yield is in 4E. 4. Cost data indicated from 2018 to the year 2020 5. Production data is for the period Jan to Dec. 6. Ounces and kilograms are based on 4E. 34 6 Geological Setting, Mineralization and Deposit 6.1 Regional Geology The Bushveld Complex (Figure 6) is approximately 2,060 million years old. Its mafic to ultramafic rock sequence, the Rustenburg Layered Suite (RLS), is the world’s largest known mafic igneous layered intrusion. The RLS contains about 80% of the world’s known Mineral Reserves of PGMs (Crowson, 2001 in Cawthorn,2010). In addition to PGMs, extensive deposits of iron, tin, chromium, titanium, vanadium, copper, nickel, and cobalt also occur. The Bushveld Complex extends approximately 450km east to west and approximately 250 km north to south. It underlies an area of some 67,000 km2, spanning parts of Limpopo, North West, Gauteng, and Mpumalanga Provinces. The RLS which was derived from differential crystallization of multiple magma injections, occurs geographically as five discrete compartments termed “limbs”, three of which are being exploited for PGMs. These are the Western, Eastern, and Northern Limbs. The Rustenburg Operations are located on the Western Limb (Figure 7). The RLS comprises rocks ranging from dunite and pyroxenite through norite, gabbro and anorthosite to magnetite- and apatite-rich diorite. The RLS is subdivided in terms of a mineralogically based zonal stratigraphy into five principal zones. 35 Figure 6: Geology of the Bushveld Complex, South Africa 36 Figure 7: Geology of the Western Limb of the Bushveld Complex, South Africa From the bottom of the sequence to the top (Figure 8), these zones are the 1) Marginal Zone, 2) ultramafic-rich Lower Zone, 3) mafic-rich Critical Zone which hosts multiple chromitite and PGM layers, 4) a mafic-rich Main Zone consisting mostly of gabbro-norites and norites, 5) and the final Upper Zone derived from the crystallization of iron-rich residual fluids. The RLS varies in vertical thickness, reaching up to 8 km in places with some individual layers traceable for over 150 km. However, the PGM bearing reefs are typically only 0.3m to 15m thick, although much greater thicknesses are recorded in the Platreef of the Northern Limb. In the Eastern and Western Limbs, the Critical Zone contains the two principal PGM-bearing reefs: the Merensky Reef and the UG2 Reef. Mineral Resources and Mineral Reserves are reported for both the Merensky and UG2 Reefs which are the primary PGM and base metal sources mined at the Rustenburg Operations.
37 Figure 8: General Stratigraphic Column of the Rustenburg Layered Suite 6.2 Deposit Types 6.2.1 Formation of Deposit PGM reef-type deposits are deposits where the PGM are the main products and Ni and Cu are the by- products (e.g., the UG-2 and Merensky reefs of the Bushveld Complex, or the J-M reef of the Stillwater Complex, Montana and the MSZ of the Great Dyke of Zimbabwe). The deposits generally contain less than 1-2 % sulphide minerals and tend to form laterally relatively persistent stratiform horizons in large layered intrusions that are often relatively easy to trace once they have been intersected. Most mineral deposits can be classified into specific groups or types and exhibit common features and mineralogical associations which relate to the geological processes that ultimately formed them. Ni- Cu-PGM deposits can be found in a variety of deposit types including (a) magmatic, (b) hydrothermal, (c) sedimentary/placer, and (d) residual/laterites, however, they are almost exclusively dominated by magmatic processes. Magmatic Ni-Cu-PGM deposits have been some of the most sought after and important deposits in the world. At a basic level, formation of these deposits relies on magma generated from the Earth’s mantle, which then intrudes its way into the crust, often melting and incorporating the surrounding rocks causing ‘contamination’ within the original magma. Slow cooling 38 of these magmas generates immiscibility between sulphur and silicate liquids, ultimately leading to the formation of Ni-Cu-PGM enriched sulphide rocks embedded within mafic and ultramafic igneous rocks. Many of these deposits around the world have been identified and are well documented in the literature, including the largest one, Stillwater Complex (United States of America), Norilsk (Russia), Sudbury Complex (Canada) and Great Dyke (Zimbabwe) as well as the Bushveld Complex (South Africa). Ni-Cu-PGM deposits are associated with mafic-ultramafic magmatism with a few key differences to mention between these deposits. 6.2.2 Stillwater Complex The Stillwater Complex is the world’s fourth largest PGM deposit known today and comprises a large irregular sheet-like ultramafic intrusion. The intrusion can be divided into the Ultramafic Basal Series, Lower Banded, Middle Banded and Upper Banded series, which show evidence for multiple injections of magma. The most economically important series is the Lower Banded series, which contains a broadly continuous zone of PGM-rich olivine units known as the J-M Reef (McCallum, 1996). The J-M Reef is hosted within a sequence of harzburgitic and troctolitic rocks and can be traced along strike for approximately 36km with an average thickness of 2m (McCallum, 1996). The reef contains 1-2% disseminated sulphides at 20-25ppm Pt + Pd with 3.6 times the Palladium to Platinum content. Due to the steeply dipping nature of this reef, underground mining methods have had to be implemented. 6.2.3 Norilsk Province Norilsk is the third-largest Ni-Cu-PGM deposit in the world. The Norilsk Province represents a large extrusive or volcanic sequence of basaltic lavas with rare komatiite lavas intruded by isolated layered ultramafic magmas. Like the Stillwater Complex, the Ni-Cu-PGM deposits within the Norilsk Province are associated with these layered ultramafic intrusions. Unlike Stillwater, the sulphides within this province are found ranging from massive, veinlet-disseminated to disseminated ore bodies at varying intervals throughout the layered intrusives. The mineralised zones within the layered intrusives are complex and variable in size and shape, therefore emphasis has only been placed upon the massive ore bodies. The massive ore bodies are by far the most economical in value, which are recorded to reach hundreds of metres in lateral extent ranging from centimetres to 45m in thickness (Krivolutskaya et al., 2014). Ni content is extremely high with these massive ores, up to 3.21 wt %, with Ni/Cu ratios ranging from 0.23 to 0.45. PGM contents within these zones reach 1.5 – 2.0 ppm Pt and 7.0 – 9.0 ppm Pd, mostly confined to the margins of the massive ore bodies (Krivolutskaya et al., 2014). 6.2.4 Sudbury Complex The Sudbury Basin is a unique type of Ni-Cu-PGM deposit, as it is the only deposit related to a meteorite impact and the world’s largest Ni deposit. The complex has been suggested to have formed by impact melting of originally mafic rock types, which have generated a magmatic body consisting of a lower melanocratic norite overlain by leucocratic norite. Then lower norite unit is recorded to have elevated Ni (40 – 1000 ppm), Cu (40 – 1140 ppm), and Pt + Pd (3.7 – 15.1 ppb) with the upper more felsic norite being only somewhat enriched in these elements (Keays & Lightfoot, 2004). Due to the complicated relationship of this deposit with the meteorite impact, several types of mineralised zones have been 39 described, which includes a contact layer, footwall breccias, large radial structured dykes and vein- like deposits (up to 1,000m from the centre of the impact structure). The impact structure itself has been measured up to 200km in diameter, displaying an oblate-like shape. The deposits found within the Sudbury Complex are mainly confined to the margins of the magmatic body and are relatively scattered throughout. The average grade of the deposits been mined show roughly 1.2 wt% Ni, 1.1 wt% Cu, and 0.8 g/t Pt + Pd. Therefore, there is a target mainly for their Ni and Cu contents with PGM mainly as a by-product (Keays & Lightfoot, 2004). 6.2.5 The Great Dyke The Great Dyke is a linear intrusion that trends north-south that cuts across the Archaean granites and greenstone belts of the Zimbabwe craton consisting of layered mafic and ultramafic rocks (Chaumba and Musa, 2020; Wilson and Prendergast, 2001). The length of the Great Dyke is 550 km, and its thickness varies between 4 km and 11 km in width. The Great Dyke acts as host to the second-largest resource of PGMs in the world (Wilson and Prendergast, 2001). Four sub-chambers make up the Great Dyke, namely Musengezi, Darwendale, Sebakwe and Wedza sub-chambers (Wilson and Prendergast, 2001). Two economically viable zones have been identified: the Main Sulphide Zone (MSZ), which is the most economically viable and the thicker, but lower grade, and the Lower Sulphide Zone (LSZ) that contains much less sulphides. The Main Sulphide zone is 1 to 15m thick, and the Lower Sulphide Zone is 30 to 80m thick. Both the MSZ and LSZ occur within the pyroxenite of the uppermost ultramafic cyclic unit (Wilson, 1996; Wilson and Prendergast, 2001). The average grades reported from mining operations at Ngezi, Unki and Mimosa have shown roughly 3.86 g/t 6E. 6.2.6 The Bushveld Complex Bushveld Complex comprises several intrusive and extrusive bodies, including the RLS, the Lebowa Granite Suite, the Rashoop Granophyre Suite, and the Rooiberg Group Volcanics. The RLS includes many layers grouped into stratigraphic units from base to roof: Marginal Zone, Lower Zone, Critical Zone, Main Zone and Upper Zone, which are distinguished on geological maps or cross-sections. These stratigraphic units show evidence for repeated injections of magma and the changes in mineral composition with stratigraphic position show trends and patterns consistent with the expected crystallisation pattern of mafic magma. The Bushveld Complex is a remarkably well preserved, extremely large mid-Proterozoic intrusion that has escaped regional metamorphism and extensive deformation. The most economically important stratigraphic unit within the RLS is the Critical Zone, which hosts the world greatest chromite and platinum deposits. These deposits are usually situated in successive well- defined layers and are locally termed ‘reefs’. The PGM deposits occur within the well-defined Merensky and UG2 Reefs. The Merensky and UG2 Reefs are Cu-Ni-PGM-enriched contact-type and stratiform chromitite deposits, respectively, with low sulphur content. The PGM mineralised layers are typically in stratigraphic intervals that mark a major lithologic and petrologic change in the layered igneous intrusion. Local and Property Geology 40 6.3 Local and Property Geology 6.3.1 Stratigraphy The recognized stratigraphy underlying the Rustenburg Operations comprises the Main and Critical Zones of the RLS. The stratigraphy of the RLS as formalised by the South African Committee for Stratigraphy (SACS, 1980) is used in this report. The Main Zone predominantly comprises gabbro–norite and norite rock types, whereas, in the Upper Critical Zone, pyroxenite, norite, anorthosite, and chromitite lithologies are found. The Upper Critical Zone stratigraphy of the RLS, which contains the units of economic interest, the Merensky and UG2 Reefs, comprises well-developed cyclic units divided into six sub-units as follows (Figure 9): • Bastard Pyroxenite • Merensky Reef • Merensky Footwall • UG2 Hangingwall • UG2 Chromitite Layer/Reef • UG1 Chromitite Layer In Rustenburg Operations, there are local variations in thicknesses of individual stratigraphic units within the Boschfontein farm in the far west and the Hoedspruit farm in the east. The Giant Poikilitic Anorthosite (GPA) generally defines the start of the Critical Zone, which normally occurs 5m to 10m above Bastard Pyroxenite and approximately 20m to 25m above Merensky Reef. The GPA is normally about 7m to 10m in thickness.
41 Figure 9: General Stratigraphic Column of the Local Geological Succession After Smith et al 2004 42 6.3.2 The Ore Bodies 6.3.2.1 Merensky Reef The hangingwall of Merensky Reef comprises medium-grained pyroxenite, which grades into a fine- grained melanorite (Hangingwall 1 – HW1) grading into norite (HW2) and a poikilitic anorthosite which is termed HW3. These three units are situated below the Bastard Pyroxenite with thicknesses ranging between 1 and 3m. Merensky Reef is underlain by the norite/leuconorite and a thin anorthosite layer which is approximately 10cm to 20cm thick, which is in turn underlain by norite with a layered texture. The norite is separated into sublayers of anorthosite and pyroxenite. Several stratigraphic markers exist in the footwall stratigraphy of Merensky Reef, namely, Footwall marker, Brakspruit marker, Pioneer marker and a Boulder Bed. The Boulder Bed is a poikilitic anorthosite layer with thicknesses ranging between 10cm to 20cm. The elongated coarse-grained pyroxenite boulders, which are often pegmatoidal in texture, occur within the layer. The style of occurrence of the Merensky Reef is affected by several geological features throughout the Western Limb of the Bushveld Complex. The mineralisation thickness varies on a local scale. The stratigraphic definition of the physical geology of normal Merensky Reef is a pegmatoidal feldspathic pyroxenite layer bounded by the top and bottom chromitite layers. On average the thickness of this stratigraphic unit varies between 5cm to 60cm over large areas. Where this unit reaches thicknesses up to 1.5m, the bottom chromitite layer is poorly developed or even absent. In this case, the texture of the pegmatoidal pyroxenite becomes patchier due to the presence of fine- grained pyroxenite. The lower zone of the thicker Merensky Reef becomes less mineralised and often serpentinized. 6.3.2.2 UG2 Reef The UG2 Reef consists of the Main Seam chromitite. Overlying the UG2 Main Seam is an unmineralized pyroxenite layer, locally termed the pyroxenite parting or simply parting (UG2P). Above the pyroxenite parting (UG2P) another chromite layer, the UG2L, locally referred to as the Leader Seam, which is the topmost mining mineralised lithological unit. The thickness of the Main Seam ranges from 65cm to 80cm, whilst the pyroxenite parting varies from 10cm to 4m and the Leader Seam thickness varies from 12cm to 25 cm. In areas where the pyroxenite parting is too wide, then only the Main Seam is exploited. The UG2 Main Seam and UGL display a mottled appearance due to the presence of large bronzite crystals within the chromite. UG2 Main Seam The UG2 Main Seam is chromitite rich, but lower in gold, copper, and nickel values compared to Merensky Reef. It is consistently developed in the RLS, occurring vertically between 90m to 150m below the Merensky Reef in the Rustenburg Operations lease area. The UG2 Reef dips in a northerly direction at 5 to 100. 43 The hangingwall to the UG2 Reef is a 6m to 7m thick feldspathic pyroxenite interlayered by a succession of multiple chromitite layers that are referred to as Leader Seam and triplets layers. The Leader Seam The Leader Seam is a chromitite band that is approximately 15cm thick. The stratigraphic separation between the Main Seam and the Leader Seam is a feldspathic pyroxenite with a vertical thickness ranging between 20cm to 250 cm. The Triplet Chromitite Layers These chromitite layers are interlayered with the feldspathic pyroxenite. This succession is between 30cm to 70cm thick. The triplets are found between 2m to 10m above the UG2 Main Seam. The variation in the separation between chromitite layers and the UG2 Seam affects the mining of the UG2 Reef. The UG2 Main Seam, Leader Seam and triplets layers are variably separated in thicknesses which result in thinning and thickening of the stratigraphic package. The geotechnical consideration is where the separation distance between the Leader Seam and the Main Seam is less than 30 cm. The geotechnical beam for a stable hangingwall to the mining excavation is more than 30cm thick. Underlying the UG2 Main Seam is the pegmatoidal feldspathic pyroxenite which varies in thickness from a few centimetres up to 2 m. The normal footwall stratigraphy comprises pegmatoidal pyroxenite, which is in turn underlain by a succession of norite, pyroxenite, and anorthosite. The UG2 Main Seam is occasionally unconformably underlain by norite footwall. For the UG2 Reef, the number and position of the chromitite layers associated with the pyroxenite hangingwall stratigraphy determine the geozone definition. In-situ mineralisation of the UG2 Reefs is captured by the definition of geozones (Section 11.1.2). 6.3.3 Structure The UG2 and Merensky Reefs form an east-west trending open arc, with a strike varying between 90° in the east to 145° in the west. The general dip of the reef is 9° to 10°. The middling between UG2 Reef and Merensky Reefs varies between 120m to 140 m. The dip of the encompassing regional stratigraphy also varies between 9° and 10° with a general east-west strike direction. On the farm of Paardekraal the dip decreases locally between 1° to 5° and increases to between 15° to 30° along a monocline trending east-west at depth. The dip decreases from 3° to 7° across the farms of Klipgat and Turffontein, also roughly striking east-west. Localised geological discontinuities associated with the Merensky and UG2 Reefs include potholes, faults, joints, shears zones, dykes and IRUP bodies. These are the main structures that impact to the Material asset. The structure map is shown on Figure 10. Figure 11. 44 Figure 10: Structure Map of Rustenburg
45 Figure 11: A Down Dip Cross-section Showing Merensky and UG2 Reefs (S-N) 6.3.3.1 Faults The Qualified Person has defined faults that transect the mining operation, i.e., the Hex River fault, which is a prominent structure. Low angle faults exist which have very small displacements but are very important to understand to ensure correct hangingwall support recommendations. At depth, the farms of Klipgat and Turffontein have various strike-orientated faults trending in a west-northwest to east-southeast direction with varying throws. The F-series faults are boundary faults: F1 faults have throws of up to 350m, whereas the F3 faults have throws of up to 120 m. The F1 and F3 faults constitute the boundaries of a regional graben structure. 6.3.3.2 Dykes Post mineralisation dykes of various scales are prominent across the property. These structures typically define strike mining limits as well as influence reef continuity. Dyke occurrences are between 1cm and 30m wide. They have steep dips varying between 70° and 90°. Dykes may be water-bearing. 6.3.3.3 Potholes The term Pothole is applied to features that affect the Merensky and the UG2 Reef and refers to the downward transgression of the reef through single or multiple underlying footwall layers, only to stabilize (unless catastrophic, which occur sporadically) on a specific footwall layer, lower than the original or normal stratigraphic position. The hypotheses for pothole formation involve several mechanisms, including downward erosion, upward fluid movement, or syn-magmatic deformation (Watson et al., 2021). 46 Potholes associated with the Merensky and UG2 Reefs are generally observed as semi-circular features at the Rustenburg Operations. They vary in size from a few meters to hundreds of meters in diameter. The depth of the potholes is highly variable. There is no clear-cut relationship between the depth and the size of potholes. To a certain degree, the following the relationship between the dip and size of potholes has been observed by QP: the steeper the dip of the pothole, the smaller the size. Potholes and certain steep dipping roll structures in the reef result in geological losses. Schematic sections in Figure 12 and Figure 13 below describe the type of potholing of the UG2 Reef. Similar structures are found on the Merensky Reef. Various complementary geological datasets define two major slump structures namely the Brakspruit pothole in the eastern section of the Rustenburg Operations and Regional Depression within Thembelani 2 Shaft area and Paardekraal farm which has a diameter of 1.5 km. Both Merensky and UG2 Reefs are affected by these features. Figure 12: Example of a Shallow Dipping Pothole Associated with the UG2 47 Figure 13: Example of Deep Potholing Associated with the UG2 6.3.3.4 IRUP Iron-rich replacement pegmatoids (IRUP) comprise a suite of coarse crystalline, and unconformable replacement bodies, which occur throughout the Rustenburg Operations. They range from small, irregular, and vein-like features, to large sheet-like bodies up to hundreds of metres across, and pipe- like plugs up to 1.5 km wide (Figure 14). Within the operations, different levels of IRUP replacement occur but it is only the total replacement of the Merensky Reef that causes large difficulties, as lithological units become unrecognisable. IRUP replacement is typically pegmatoidal, often containing high levels of titanium rich magnetite (Reid and Basson, 2002). The UG2 Reef is not replaced, IRUP only generally affects the hangingwall or footwall stratigraphy. However, the mineralogy of the reefs is changed due to the high temperature, high pressure, and volatiles associated with the replacement process which reduces plant recoveries of the PGM assemblage. 48 Figure 14: IRUP (red) Unconformably Cut Across the Layered Lithological Sequence. 6.3.4 Mineralogy 6.3.4.1 Merensky Reef The Merensky Reef mineralogy comprises major silicate minerals: pyroxene, plagioclase, and biotite. These minerals form secondary minerals such as talc and chlorite in structurally disturbed and weathered areas. PGM mineralization is closely related to thin chromite layers (1mm to 5cm thick). PGM and sulphide mineralization can also occur in the immediate footwall rocks. The dominant platinum group minerals are ~30% Pt-Pd sulphides (braggite-cooperite), ~11% PGM tellurides and arsenides, ~6% sperrylite and minor PGM alloys. Platinum group mineral grain sizes have two size ranges in the Merensky Reef: 10 to 30µm and 50 to 350µm. The platinum-group minerals of the Merensky Reef occur in three textural associations: • Enclosed in or attached to base metal sulphides (38 - 97 %). This is a common occurrence on the western limb. • Enclosed in silicate (3 - 62%) and further north along the western limb past the regional Swartklip facies (62%). • Enclosed in/or attached to chromite or Fe-oxide. 6.3.4.2 UG2 Reef The UG2 Reef consists predominantly of chromite (60 to 90% by volume) with lesser silicate minerals 5 to 30% pyroxene and 1 to 10% plagioclase. Other minerals, present in minor concentrations, can
49 include the silicates: phlogopite and biotite, the oxides: ilmenite, rutile and magnetite, and base metal sulphides. Secondary minerals include quartz, serpentine and talc. The Cr2O3 content of the UG2 Reef varies from 30 to 35%. The PGMs present in the UG2 Reef is highly variable, but generally, the UG2 Reef is characterised by the presence of various PGM sulphides, comprising predominantly laurite (RuOsIr sulfide), cooperite (PtS), braggite (Pt, Pd, NiS), and an unnamed PtRhCuS. The PGMs only reach an average size of approximately 12 µm, with particles larger than 30 µm being extremely rare. Most of the PGMs occur in association with the base metal sulphides and silicates. It is only the mineral laurite which exhibits a preferred association with the chromite grains. Both the grain size and associations are extremely important as these affect the metallurgical behaviour during subsequent processing. The major base metal sulphides constitute chalcopyrite, pentlandite and pyrrhotite. The base metal sulphides occur almost entirely within the interstitial silicate and are only very rarely enclosed within the chromite particles. The grain size of the base metal sulphides rarely exceeds 30 μm. The distribution of grade within the layer is not uniform however PGMs are generally concentrated at the upper and lower contacts of the main chromitite, with lesser concentrations in the Leader layers. The highest PGM concentration is generally recorded at the base of the UG2 Reef chromitite. In the UG2 Reef, Cu, Ni and Sulphur values are extremely low. 50 7 Exploration There is no current exploration on this property. Any drilling, including surface drilling is related to mine planning. There are no exploration results to report. Information below on surface holes is given to illustrate the type of data that was collected in the past. 7.1 Exploration Data Rustenburg Operations are established mining operations in a mature mining district. There are no greenfields exploration programs associated with this operation. Limited surface exploration diamond drilling is undertaken on an ad hoc basis to firm up geological confidence at the operations, especially where structural orientations are not suitable for underground drilling. However, underground (brownfield) evaluation drilling continues. 7.2 Geophysical Surveys No geophysical surveys have been flown over the property recently. No gravity surveys had been conducted over the property recently. A brief description of historical aeromagnetic and 3D seismic surveys is given in Sections 5.2.1.1and 5.2.1.2. 7.3 Topographic Surveys The topography in the lease areas is well mapped from historical surveys. The QP’s view is that any recent changes to the surface topography will not affect the geological interpretation or infrastructure. There have been no new surveys related to exploration recently. 7.4 Exploration and Mineral Resource Evaluation Drilling 7.4.1 Overview Geological Models and Mineral Resources at Rustenburg Operations are based on all available information comprising sonic drilling (TSF), diamond drilling and underground channel sample data, underground mapping, as well as remote geophysical and remote sensing data (including Aeromagnetic, 3D Seismics and Wireline surveys). This information is available for the entire Rustenburg Operations area. Surface diamond drillholes (DDH) were generally drilled on irregular grid intervals of 150m-2,000m dependent on historical exploration strategy, depth of the mineralised horizons and geological uncertainty. Once underground access is available, infill development drilling is undertaken from access haulages and crosscuts to provide a 30m -100m grid depending on geological requirements from structural, safety and evaluation perspectives. 51 Historically, several drillholes targeting the UG2 Reef were collared at the Merensky Reef elevation from underground excavations resulting from the mining of the Merensky Reef. In the case of capital-funded surface and underground exploration DDH, BQ size diamond drill core is recovered from the mother hole. Thereafter, four TBW size deflections are drilled for each reef intersection, producing a total of four deflections for Merensky Reef and four deflections for UG2 Reef. In cases of adverse drilling conditions, more than four deflections may be drilled. The core is halved using a diamond saw, with one half retained for records or metallurgical purposes and the other half assayed. For routine working cost underground DDH, the drill diameter is generally less than for surface drillholes and where applicable usually the entire core is sampled and assayed. Sample sections are captured directly into the SABLE database, where the spatial validity is checked. Planned and unplanned task observations are some of the QA/QC procedures used to ensure sampling protocol is maintained. The final submission of each sample into Sibanye-Stillwater’s PGM SABLE database is only completed following a series of checks and approvals. Rustenburg Operations rely on Quality Laboratory Services, a South African National Accreditation System (SANAS) accredited laboratory for mineralogical analysis of the samples. Rustenburg Operations Drillhole Inventory A total of 11,571 drillholes are included in the drillhole dataset. These can be divided as follows: • 6,027 drillholes are derived from surface drilling campaigns up to 2020. • 5,544 drillholes are derived from underground drilling intersections that were sampled and assayed. • 1,884 drillholes were removed due to geological disturbances, i.e., potholes, faults, IRUP, etc. • 582 drillholes were removed due to specific validation errors detailed in the data processing macros. • 1,704 drillholes were removed due to other reasons, e.g., cover holes or flat dipping holes < 60 degrees that could not be accurately corrected for length compositing. • 144 drillholes were excluded from Mineral Resource estimation due to historical problems. • 8,146 drillholes (including deflections) in the SABLE database are authorised and validated for Mineral Resource estimation. Changes in the drillhole inventory in 2021 are shown in Figure 15 and Figure 16. 52 Figure 15: Reconciliation of Drillhole Data Figure 16 Reconciliation of Historic Drillhole Data Waterfall Tailings A total of 199 drillholes were done on Waterfall Tailings Complex in 2008 by AAP at a nominal grid of 100m X 100m. 7,83313 0 7,819 31 -137,832 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 2 0 1 9 R e m o v e - V a lid a ti o n 2 0 2 0 A d d - N e w in te rs e c ti o n s R e m o v e - V a lid a ti o n 2 0 2 1 n u m b e r o f d e fl e c ti o n s Yearly Sable Database Reconciliation -2021
53 7.4.2 Planned Evaluation Drilling for 2021 Table 16 represents the planned surface and underground drilling that will be carried out at Rustenburg in 2022, compared to the actual drilling results of 2021 and 2020. Table 16: Rustenburg Evaluation Drilling Costs Exploration (WC & Capital All Reefs) C2022 Plan C2021 Actual C2020 Actual C2019 Actual Meters Planned ZAR Million Meters Drilled ZAR Million Meters Drilled ZAR Million Meters Drilled ZAR Million Khuseleka UG 810 0.73 740 0.66 864 0.78 714 0.61 Thembelani UG 4,320 3.47 1,149 0.88 607 0.48 953 0.75 Siphumelele UG 500 0.40 557 0.45 300 0.27 623 0.56 Bathopele UG 5,640 6.52 3,815 4.41 2601 2.95 3,287 3.72 Bathopele Surface 2,304 3.57 - - - - 764 1.08 Total 13,574 14.69 6,260 6.40 4,372 4.48 6,341 6.72 No surface exploration diamond drilling is planned for Rustenburg Operations. Underground exploration/evaluation drilling is carried out on a standard pattern once development has taken place at the three conventional shafts (Khuseleka, Thembelani and Siphumelele). No evaluation drilling takes place at Bathopele mine as mining takes place on the plane of the UG2 Reef rendering the geometry of the orebody and mining method unsuitable for evaluation drilling. It is applied for investigating geological structures such as potholes and faults. No surface exploration diamond drilling is planned for Rustenburg Operations. Overview of all drilling is given in Figure 17 and Figure 18. 54 Figure 17: Overview of Drilled Boreholes 55 Figure 18: Overview of Drilled Boreholes on Waterval Tailings 7.4.3 Drilling Methods 7.4.3.1 Surface Diamond drill coring is the preferred method of drilling at the Rustenburg Operations. Sonic drilling was only completed on Waterval Tailing Complex in 2008 by AAP. Figure 19 shows a typical diamond drill core with the machine diamond drilling bit. 56 Figure 19: Example of Diamond Drill Core (https://www.geologyforinvestors.com/diamond-drill-hole-drilling/ accessed 23/09/20) The typical steps followed would have been: • In a case where Sibanye-Stillwater does not own the surface rights, permission from the landowner is obtained. • A drillhole start note is compiled, which displays the drillhole identification, location of the collar, the planned depth and a plan showing any possible underground workings that could be intersected. The drillhole is to be sited by the responsible geologist using a GPS. • The drill rig supervisor will establish the drill site using a minimum footprint and will comply with good housekeeping and approved standards and procedures. • The drill site will be clearly demarcated by use of the appropriate materials and open sumps should be contained within a secured or permanently manned area. • Drilling begins with a large diameter ‘open hole’ (open hole means non-coring and only chips are recovered). The diameter of this hole can be 200 to 250mm (8 to 10 inches). The depth of this hole also varies as it is usually drilled to solid bedrock, through soils and oxidized rock. The diameter of the hole reduces in various steps, at differing depths down the hole, to reach typically BQ size hole (75mm hole size and 50mm core). • Hole collar is surveyed using land surveying methods to give x, y, and z positions or coordinates. • Drilling continues until one or both reefs are intersected, or in the case of an unsuccessful hole the hole is abandoned. Once the reef is intersected, an additional 50m is drilled and the ‘Mother hole’ as it is then known as complete. • Once the mother hole is complete, a down hole survey is performed (and any other geophysical surveys as required), so that the inclination and direction of the hole can be recorded. (Section 7.5).
57 • Typically (but not always) additional intersections (or runs) of the target reef are obtained by ‘wedging’. A steel wedge is inserted above the reef and locked into place, this can be directional i.e. surveyed in place or non-directional meaning the direction of the resulting deflection is not prescribed. The wedge acts as a guide to deflect the drill string off to one side of the hole so that additional reef intersection can be obtained. • This is repeated as often as needed to get representative reef intersections, with the wedges being set higher and higher up the hole, and denoted by the identification of the drillhole ID _D1 to drillhole ID _Dn. Under normal reef conditions, four (4) deflections are planned per reef intersection. • All reef runs are drilled TBW core size. • A diagram of a set of deflections from its motherhole is known as a dendrogram and is shown in Figure 20. • Once the drillhole is completed, rods are removed, the upper part of the hole is cemented or plugged, and any recoverable casings are removed. • Whole site is rehabilitated and a d a cap or marker is placed on the remaining casing to the requirements of the landowner. Figure 20: Schematic Vertical Section of a Typical Surface Drillhole 7.4.3.2 Underground Drilling Underground drilling (i.e., the machine itself is underground during drilling) takes place for three distinct reasons, these are: • Cover drilling • Short exploration holes (working cost) • Mining Holes (drain holes, holes for geophones, etc.) 58 Cover drilling Cover drilling refers to the drilling of generally flat or slightly inclined holes ahead of mining to detect the presence of water and flammable gasses which could potentially result in injury, fatalities and property damage. A digital plan depicting all the development ends per shaft is constructed annually and submitted to the DMRE. Based on the geology and historic water intersections the shafts are divided into different hydrological or risk areas. The type of water/flammable gas cover required for each area is clearly shown by this plan. The following types of cover are specified on the Water Plan: • Single Cover – A single set of staggered 120m cover holes with no less than a 15m overlap (Figure 21). • Double Cover – A double set of 120m staggered cover holes with a 60m overlap. (Figure 22) o Note: Start of cross-cuts, tramming loops, lay-bys and any excavation that is within 30m of haulage excavation is deemed to be in cover. The following risk areas are specified per shaft per area on the Water Plan: Level 1 Risk Area • All known major geological disturbances (inclusive of all dykes of more than 10m thickness, faults of more than 10m displacement and major shear zones) as indicated on the structural plan (Aeromagnetic study, Seismic Interpretation Data, surface mapping, original surface drilling and from historic underground mapping) will be cover drilled within a 150m envelope on either side of these known structures. These areas will include all historically recorded geological features associated with very poor ground conditions or water intersections greater than 5,000 l/h or flammable gas intersections. The cover drilling design will be based on a single cover hole pattern with a 15m overlap portion in consecutive holes. Double cover may be recommended by the Superintendent Geology for areas advancing through fissure zones known to have poor ground conditions. Level 2 Risk Area • These areas will be delineated around projected problematic geological structures that were intersected previously along dip or strike. These structures will be cover drilled on discretion through a documented decision taken during water board planning meetings. 59 Level 3 Risk Area • These areas pertain to localities on the mine property where no high volumes of water and/or flammable gas are expected from surrounding geotechnical observations. The development ends will be covered by the drilling of pilot holes as per mining standards for development ends. Every development end shall, before drilling blast pilot holes, drill two pilot holes in opposing corners to prevent the uncontrolled intersection of water or flammable gas from isolated pockets. Corners should be alternated between blasts. Pilot holes are under no condition a replacement for cover holes. The requirement for geological cover drilling over and above the pilot holes in an area will be revised during water board planning meetings and the area will be elevated to a Level 2 or Level 1 Risk Area and cover drilled accordingly. Mining within 60m depth below major rivers (mechanised mines) • An area that will be undermining a river will be cover drilled within a 150m envelope on either side of the river. The cover drilling design will be based on a double cover hole pattern with a 60m overlap portion in consecutive holes. Inclined Shafts • All inclined shafts will at least be covered with a single series of overlapping cover holes drilled parallel to the dip of the excavation being developed. Inclined shafts are to be cover drilled with 120m inclined holes with 15m overlap. Figure 21: Configurations for Cover Drilling - Single Cover Drilling Layout (one-sided). 60 Figure 22: Configurations for Cover Drilling - Double Cover Drilling Layout. Short hole exploration These holes are targeted for reef intercepts from the underground workings that are in place to exploit the same reef. As a result, these holes tend to be a maximum length of about 120m for air-powered drilling or 250m for hydraulic-powered drilling. Unlike surface drilling, short-hole exploration seldom uses wedges to get additional reef intersections, and accordingly, one reef intersection per hole is the norm. There is no fixed pattern for this type of drilling, but holes are roughly spaced to get an intercept at every raiseline tip position, approximately every 30 to 50m depending on the mining layout. Holes are aimed to be drilled in a cubby alongside the haulage which services the reef. This type of drilling is also used to gather further information for certain structures such as dykes or faults and the target might not necessarily be for reef intersections. The frequency of drilling would increase in structurally complicated areas if required. These short holes remain reasonably straight on azimuth and dip and are not surveyed with down-hole instruments. Occasionally the collars of these short holes are surveyed by the Survey Department where necessary. Mining holes Where the intersection of water or flammable gas quantity is deemed significant, the intersection can be allowed to bleed under a controlled environment, or it can be sealed at the source. All sealing work is to be done through a sealing company contractually appointed on behalf of Sibanye- Stillwater. • Ring cover should be executed in the event of water intersections greater than 5,000 litres/hour in any cover (or ring cover) drillhole. Order of drilling and sealing will be based on the standard ring cover procedure (Figure 23).
61 • Primary ring cover holes will be drilled from all four corners of the face. All holes will be drilled 10 degrees outward from the centre line; the top holes will be 10 degrees up and the bottom holes 10 degrees down. • Upon completion of the above, a central drillhole (hole No.5 in Figure 22) will be drilled to confirm the absence of water and/or gas ahead of the face. The check hole will be flat, online and will advance at least 30m beyond the previously defined position of the water intersection. If hole No.5 again intersects gas and/or water the second set of ring cover drillholes needs to be drilled. • Upon completion of sealing of secondary holes, a central drillhole (hole No.10 in Figure 22) will be drilled to confirm the absence of water and/or gas ahead of the face. If drillhole No.10 is found to be free of significant quantities of water (quantities that can be handled by the specific mining level’s pumping arrangement), then the development can continue up to the position deemed in cover. Figure 23: Ring Cover Configuration – Drilling and Sealing Order. 62 7.4.4 Core Logging and Reef Delineation The Mineral Resource estimation process used for Rustenburg Operations is based on surface and underground drillholes data well as underground channel chip sample data. For both drillhole and underground chip samples Rustenburg Operations have a comprehensive standard defining the specific methodology for sampling, which is designed to ensure as far as possible unbiased and representative samples as well as to ensure the consistency of the sampling. 7.4.4.1 Surface (Historical 1960’s to 2000’s) The following is a brief description of the procedures in place at the time of drilling. All drillhole core, whether from surface or underground is logged and sampled the same (or very similar) way. The core is obtained from the core barrel, once the driller has completed a drill run, or preferably on a daily basis and emptied into a suitably sized (Core sizes NH, BQ, TBW etc.) core tray. This tray is transported to the coreyard of the operation where the core is cleaned and marked with the depths of the run, the drillhole name and metre marks. Any losses are identified, and core loss amount noted. This mark-up is completed by the drill contractor. The core is then transferred into a differing ‘permanent’ core tray so that the transporting tray can return to the drill site. The geologist then observes the core and immediately checks for stratigraphic correctness. The following is an extract from Rustenburg Operations drillhole geological logging and sampling procedure which details the process • Check that the core is clean, fits together and orientated correctly per core box. • Core boxes are laid out from shallowest to deepest with the ends of core in each box clearly marked. • Check that the metre clino-rule used is correctly calibrated with a steel metre tape • Check for errors in the stick-up depths and marked metres of the mother hole and compare with all deflections. Ensure that the reef intersection depth of the mother hole does not differ greatly to all the deflections (not more than 30cm). • Determine core loss (or gain) and note the position of start of BQ size core. • Any sudden changes in lithology without faulting are noted and the core checked to see if it fits together on either side. • Any discrepancies identified in 1 to 6 above are discussed and resolved with the Diamond Drill Foreman. • Before logging in detail, determine the major stratigraphic units and forms general impression of the hole. • For both the UG2 and Merensky Reef intersections, rotate and fit core correctly before logging. • Compare mother hole with all deflections and determine the facies type of reef intersections (UG2 and Merensky Reefs). 63 • Mark the stratigraphic contacts of both UG2 and Merensky hangingwall and footwall units. • All logging and checking of core are done when core is wet (use spray bottle or hose pipe). • Logging recorded on the relevant log sheet with all the required fields captured manually. • Logging of the minimum required information must be logged using the prescribed SABLE codes. • For any dip measurement, readings are taken relative to the perpendicular (Alpha angle). • Safety precautions are to be adhered to at all times. 7.4.4.2 Underground Channel Sampling Within underground workings, exposures of the reef have channel samples taken. Individual channels are cut from the underground development-working faces using a diamond saw generally on the pillars left from the bord and pillar mining method or on the face of the mining panels. A detailed sampling record is kept showing the reef geometry at each section respectively. Underground sampling (raise lines, advanced strike gullies (ASGs) and Panels for conventional mines and pillar or panel face panel sampling (in mechanised mines) takes place at intervals determined by reef type and excavation type. This is detailed in the available standard for sampling, respectively. Channels are defined perpendicular to the reef plane and each section’s position is fixed by offsetting from survey pegs. The reef is segregated into lithological units and is correlated between sample sections. Individual samples of 15cm – 25cm in length are taken to reflect the internal geometry of the reef, with not less than a 10cm sample being taken on contact. The sample mass taken is in the order of 300g to 500g. Adjacent samples spanning the hanging wall or footwall contact may be taken to increase the sample volume in the contact area. Capture - Underground Sampling All underground channel samples are captured in the MRM database. This database is linked to Sable Database for sample submission to the laboratory and QAQC. Capture – Borehole Data • Logging and sampling are captured directly into the SABLE Database • Assays are imported into the SABLE database from *.CSV files • All quality control analysis on logging is carried out via standard routines in SABLE and assays via Excel templates and • Once authorized, drillhole data is exported to an Excel spreadsheet. 7.4.4.3 Quality Control in Drilling. Quality control in drilling has been practiced over many decades and was a standard feature of drilling procedures both historic and current. Table 17 shows the typical quality control measures adopted for drilling. 64 Table 17: Quality Control in Drilling Risk / Mistake Cause Mitigation/Remedial Action Mixed core Dropped core tray Ensure pieces lock & stratigraphy lithology ‘flows.’ Mixed on transfer box to box Transfer core barrel to tray Core tray to sample bag Ground core Core left in the core barrel too long Core loss should indicate how much ground away, stick up required Friable ground Cement and redrill Core loss Ground core Cement and redrill Friable/void ground Depth markings Driller’s rule / tape incorrect Get correct length instrument & remark Incorrect from - to recorded Regular reviews by the responsible person Differing core barrel lengths or incorrect lengths used Increased supervision of drillers The QPs are satisfied with the core logging and reef delineation carried out at Rustenburg Operations. These activities are performed by trained geologists who are supervised by the experienced geologists. The use of a common manual for core logging and reef delineation and marking ensures consistent core logging and sampling at Rustenburg Operations, which facilitates the integration of the datasets during interpretation. 7.5 Survey Data Typically two survey types are required for each drillhole, these are: • Collar survey • Downhole survey Collar surveys for surface holes are usually carried out by a qualified land surveyor, either using trigonometric beacons and triangulation (historical practice) or lately by using differential GPS System. Accuracy is within the 10cm range. Collar surveys for underground holes are usually taken from the nearest survey underground peg and measured using tapes and a clinorule. Accuracy is probably of the order of 20cm Downhole surveys, typically performed for surface holes have evolved in the past. Currently, professional surveyors are contracted to carry out downhole surveys. Photographic Downhole Survey -1930’s to 1990’s (Leutert, Sperry Sun) The magnetic single shot survey uses a small camera mounted to the drill string which takes photographs of a compass card, and plumb bob which indicates the dip and dip direction of the hole at a particular depth.
65 As only a single shot the survey must be run several times to get an overall trajectory of the hole. Later developments along the same theme were the magnetic multi-shot surveys where the film was captured on a roll. See: https://www.drillingmanual.com/2017/12/directional-drilling-surveying-magnetic.html for details. Gyroscope survey Gyroscope surveys were utilised for some of the last surface drillholes to be drilled, around the early to late 2000’s. For a complete description of the method a good reference is https://www.drillingmanual.com/2017/12/directional-drilling-surveying-gyro.html. Multishot Surveys More recently surveys use Electronic Multishot Surveys which use accelerometers to measure gravity, and therefore inclination, and magnetometers to measure the Earth’s magnetic field at the survey point, and thus declination of the drillhole Underground Surveys Historically and currently at Rustenburg Operations, most short underground holes are assumed to be straight and therefore not surveyed. The QPs are satisfied with the surveying methodology at the Rustenburg Operations. These activities are performed by trained surveyors who have sufficient experience with this type of orebody and mining method. The surveys are deemed to be of sufficient quality for use in Mineral Resource estimation. 7.6 Density Determination 7.6.1 Underground Drillholes and Channel Samples All surface exploration holes and underground channels reef intersections densities are determined in the laboratory using a gas pycnometer. The QPs are aware of the potential overestimation of tonnage and metal content by up to 3% due to the use of the pycnometer density. The defaults were determined by carrying out a classical statistical analysis per stratigraphic unit (length and density weighted). The following default mean densities were applied: • UG2 Leader Seam- 3.60 t/m3 • UG2 Leader Seam Parting - 3.10 t/m3 • UG2 Main Seam – 3.99 t/m3 • UG2 Footwall - 3.36 t/m3 • UG2 Norite - 2.80 - t/m3 • Merensky Hangingwall - 3.29 t/m3 • Merensky Reef - 3.22 t/m3 • Merensky Footwall - 2.97 t/m3 66 7.6.2 Tailings Facility All TSFs densities were derived from UG2 tailings and are specific density measurements completed on samples derived during the Waterval TSF evaluation program. Samples were collected from Sonic drilling equipment. The average density for the TSF is 1.7t/m3. 7.7 Underground Mapping The principal objectives of underground mapping are to: • Identify and record the positions of faults, dykes and any other disturbances in a working place, so that projections can be made ahead of the face and/or up to reef plane. • Record the thickness and nature of the reef so that facies trends can be delineated and later reconciled with sampling data. • Record and bring to the attention of the Mining Department any areas where reef remains in the hanging or footwall of the stope and/or new geological structures identified. Mapping is carried out continuously, using a set of documented procedures, and plans updated as data is collected. 7.8 Hydrological Drilling and Testwork Refer to Section 17.5.6, Water Strategy. 7.9 Geotechnical Data, Testing and Analysis Surface and underground exploration diamond drilling (core coring) is undertaken at all Rustenburg operations. The core is logged for geological and geotechnical information. Core logging is an integral part of the Mineral Resource definition and must be performed with due diligence. 7.9.1 Data Collection Rock engineering and support designs have been developed using a combination of geotechnical drill core logging and underground mapping data. Geotechnical drill core logging is the primary method of gathering rock strength and quality parameters. Geotechnical logging is completed by Geologists on drill cores recovered from surface exploration and underground cover and diamond drilling. Geotechnical core logging entails the collection of structural information from the cores. There are many parameters that are recorded during geotechnical core logging, but the following are the main ones. • Depth defining the start of each geotechnical unit • Depth representing the end of each geotechnical unit • Unique identification of each geotechnical unit • Detailed description of the geotechnical feature (type, of plane, number of discontinuities, angle of discontinuity, infill type and integrity, thickness of infill, small scale and large-scale roughness, alteration type). 67 Underground mapping includes scanline mapping techniques, rock mass classification (RMC) data collection techniques and data collected using borehole cameras, GPRs and SSPs. Rock mass classification data is collected regularly during routine inspections. Scanline mapping and geotechnical core logs by rock engineering personnel are done on an ad-hoc basis. Various tests are then commissioned based on the data obtained from drill core runs and the information derived therefrom. Samples from drill cores are sent to the laboratory to determine the properties of intact rock and joint walls. Data is collected from laboratories approved by the International Society for Rock Mechanics (ISRM), South African National Bureau of Standards (SANBS)using ISRM testing techniques. In addition, data is also collected and reviewed from various other sources, including academic research institutions, as well as various internal and external research projects and underground mapping where excavations exist. 7.9.2 Testing Methods There are various methods available to test the material strength of rocks. Two of the most valid, reliable, cost effective and easy to use methods are Rock Quality Designation (RQD) and Point Load Index (PLI). The former provides an estimation of rockmass properties and the latter is designed to give specific rock properties. These are typically conducted as routine tests on site and are performed by site rock engineering and/or geotechnical staff. Where required, International Society for Rock Mechanics and Rock Engineering (ISRM) testing methods are used to assess rock properties at accredited rock testing laboratories in South Africa. These are significantly more expensive than the tests conducted on site and are performed on an adhoc basis. Typically during a feasibility study, and/or where the rock engineer is unsure of specific rock strength or stress data for mine design purposes, will these tests be commissioned. Intact core samples are usually required for such tests and should be handled as per the ISRM sample collection and preparation methods. As the rockmass is not homogeneous, a number of samples are usually submitted for testing and these generate a range of values. The laboratory data is then downgraded (according to specific criteria) for underground in-situ representation for mine design purposes. The information is used to calibrate numerical models for the mine design. As the mine design is being executed, monitoring of the excavations is conducted and the data is used to provide a back analysis of the numerical models. Further optimisation can then be done based on the outcomes of these numerical models. This process is used by all rock engineers in the South African Mining Industry. 7.9.2.1 Rock Quality Designation Rock Quality Designation (RQD) is a standard technique in the Mining and Engineering Industries for the qualitative and quantitative assessment of rock quality using the degree of jointing, fracturing, and shearing in a rock mass. RQD is defined as the percentage of intact drill core pieces recovered that 68 are >10cm for a single core run. Therefore, it is indicative of a measure of strength of the rockmass and is used for preliminary macro designs. Therefore, low RQDs will indicate low-quality rockmasses which will require additional geotechnical work to understand the rockmass further before any design work to continue. Contrary to popular belief, high RQD rockmasses will also generate similar needs for design work as the geophysical and geomechanical properties of rocks and rockmasses are not uniform. The general equation for RQD is expressed as: RQD index (%) = 100 × Σ (Length of core pieces ≥ 0.10 m)/(Total length of core run) 7.9.2.2 Point Load Index (PLI) Summary Point Load (PL) is a test that aims at characterizing intact rock strengths. It is an index test, meaning that it can be performed relatively quickly and without the necessity of sophisticated equipment to provide important data on the mechanical properties of rocks. Many more tests can be conducted in this way, as it does not need a laboratory or perfect rock specimens to perform the tests. The test apparatus consists of a rigid loading frame, a loading measuring system and a simple system of measuring the distance between the two platens. Rock samples are compressed between the platens, which are usually about 1,5-10cms apart, so that various sizes of similar rock materials can be tested. The point load index (I s) is the force needed to fracture a sample of rock between conical points: I s = P/D2, where P is force and D is the distance between the points, both at failure. I s is related to uniaxial compressive strength (approximately equal to I s × 24) As such, this test can be used crudely to infer the rock UCS strength value. It is not used widely. 7.9.3 Geotechnical Rockmass Characterisation The main aim of geotechnical characterization is to employ the best possible mine design and support rationale to cater for the varying rockmass conditions. Therefore, the appropriate characterization of the rockmass is imperative. The Sibanye-Stillwater Platinum Operations’ Mechanized Operations: MANDATORY CODE OF PRACTICE (MCOP) to combat Rockfall and Rockburst Accidents, the MCOP, adopts a geotechnical Ground Control District (GCD) methodology to classify areas of the mine plan with different geotechnical parameters. Typically, these would consider, depth, type of reef, thickness of the seams and the relative position thereof, hangingwall types and distances to unstable and less cohesive partings, driving forces from joints, major fault zones and shear zones, minor shears and faults, domes, dykes, IRUP, water, pegmatite intrusions, variations in middling between chromitite layers as a result of rolling reefs and potholes, etc. In the deeper reef horizons, strain release from facebursts, rockbursting and seismicity associated with need to be considered. In the conventional tabular operations, the UG2 chromitite Main Seam and the overlying chromitite Leader seam, together with the intervening waste parting, form the mineable reef horizon. The thickness of the Main Seam, the waste parting and the Leader Seam varies across the entire property and in most instances the Leader Seam is mined simultaneously with the Main Seam; however, if the
69 width of the feldspathic pyroxenite parting becomes excessive only the Main Seam is mined, in which case, mining is done along the LT Geotech chromitite parting. The thicknesses of the individual seams that make up the Doublets are also highly variable, as is the distance between the bands forming the Doublets/ triplets horizon. Where the Doublets are situated less than 0.4 m above the top of the Leader Seam, it is mined out, to avoid falls-of-ground. The hanging wall of the Merensky Reef is feldspathic pyroxenite, which grades up into a melanorite and ultimately into a norite and a poikilithic anorthosite, before entering the Bastard pyroxenite unit. The pyroxenite is typically 1 – 3 m thick. The footwall of the Merensky Reef comprises norite/leuconorite and a thin anorthosite layer, which is underlain by norite. Several stratigraphic markers exist in the footwall (Footwall Marker, Brakspruit Marker, and Pioneer Marker), one of which is the Boulder Bed, a poikilithic anorthosite layer, some 20 metres below the reef. Instability within both reef horizons is driven by joints, major fault zones and shear zones, minor shears and faults, domes, dykes, IRUP, water, pegmatite intrusions, variations in middling between chromitite layers as a result of rolling reefs and potholes, and seismicity. Majority of the joints are steep dipping. Contributors to major collapses are shallow dipping structures, parting planes and major fault zones. Water generally acts as an accelerator for deterioration in jointed rock mass. The operations mine through dykes and fault zones that outcrop, with some operations in close proximity to the Hex River and other water features/canals, characterized by blocky rock mass Cover holes and pilot holes are drilled in all development ends to check for ground water and/or gas. These pilot holes are coverage ahead of the advancing excavations. Methods employed to monitor the middling between the various chromitite partings include borehole inspections using borehole cameras, ground penetrating radars (GPRs) and sub-surface profilers (SSPs). Current mining depth ranges from 75mbs to 1300mbs, which is technically considered shallow to intermediate depth. However, from underground support performance observations, conditions mimic deep level gold mining operations. At such depth, strategies are aimed at controlling the tensile zone on a regional basis to prevent large scale rock failure and immediate stope hangingwall to prevent local FOGs in the working area. Stress conditions range from low to moderately high. Stope closure rates vary widely. The Rustenburg Operations make use of the Institute of Mine Seismology (IMS) system for seismic monitoring. Seismic events in these mines relate to current mining activities traversing geological features, and most notably in the back areas of the stopes and in the deeper mining areas. 7.9.4 Geotechnical Results and Interpretation Using widely used empirical techniques (Bieniawski’s RMR and Barton’s Q rating), rockmasses are classified and included into the GCDs. Both scanline mapping and RMC data are conducted using industry best practices. The appointed rock engineer is responsible for overseeing the collection and capturing of the data. Instrumentation data collection is done according to the OEM provided training that supplies the equipment. 70 In addition, parameters are assimilated and used to assess the mine design using established, approved and recognized numerical modelling techniques. The visual evidence of hand samples, observations made underground, the results of selective laboratory testing and data from geotechnical instrumentation, show that the dominant hanging wall and footwall rocks are typical of the Critical Zone rocks found across the western Bushveld. Table 18 summarizes their average material properties and ranges of the same. Table 18 shows the data for the conventional shafts. The UCS values summarized show that the rocks are of moderate to high strength as per ISRM grading. Norite and anorthosite are of higher strength compared to pyroxenite and hence they tend to be brittle in nature. Table 19 shows the information for Bathopele Mine. The UCS values summarized show that the rocks are of moderate to high strength as per the ISRM grading. As we have established, general rockmass conditions are catered for with the use of GCDs. However, in some cases, variations in the middling between the chromitite layers may exist, and data is then collected from surface and underground additional core drilling. This is confirmed using geotechnical instrumentation specific to the investigation required. In the instance of variable stable beam thickness, data from instrumentation is used to refine the original geology isopachs that were historically constructed using surface and underground core drilling. In addition, using underground observations and drill core results, RMR and Q are calculated. Rustenburg RMR values range between 50 and 70 (fair to good rockmasses) for the majority of the mining areas. E Anomalies exist closer to major geological intersections where RMR values may be <35. These areas are treated as Special Areas as per the requirements contained in the MCOP. In general, joint properties are generally dry, planar, smooth/rough and with little to no infill for higher RMR values, and for lower RMR values, discontinuities are damp, smooth, planar/undulating and with thick infill as shown in Table 20. 71 Table 18: Summary of the material properties of the dominant hanging wall and footwall rock types (Conventional) UCS Young’s Brazilian Disc Poisson’s (MPa) Modulus (GPa) Strength (MPa) Ratio Density (kg/m3) Rock Type Av. Range Av. Range Av. Range Av. Range Ave Range Anorthosites Spotted 210 170 - 240 80 75 - 90 14 16-Nov 0.22 0.20-0.25 2,750 2,700- 2,800 Mottled 215 170 - 240 85 75 - 90 13.5 15-Nov 0.22 0.18 -0.25 2,750 2,700- 2,800 Norites Leuconorite 215 150 - 240 80 75 - 90 15.5 12 – 17 0.22 0.18-0.24 2,750 2,700- 2,800 Norite 220 150 - 240 85 75 - 90 15.5 13 – 17 0.2 0.18-0.22 2,800 2,750- 2,850 Melanorite 220 160 –240 90 80 - 90 16 13 - 17 0.2 0.18-0.22 2,850 2,750- 2,900 Pyroxenite Pyroxenite (Hanging wall and Footwall) 150 135 - 165 115 100 -125 12.5 13-Nov 0.23 0.20-0.26 3,200 3,150- 3,300 Table 19: Summary of the material properties of the dominant hanging wall and footwall rock types (Mechanized) Sample position Triaxial compressive strength UCS Tests Density Strength UCS Tangent elastic modulus @ 50% UCS Poisson's ratio @50%UCS Brazilian tensile strength g/cm³ MPa GPa GPa MPa Reef - UG2 4.16 136.9 133.3 0.32 5.3 Hangingwall - Feldspathic pyroxenite 3.26 156.4 159.0 0.24 18.9 Footwall - Pegmatoidal pyroxenite 3.31 121.9 152.3 0.27 14.8 Table 20: Rock mass classes determined from RMR total ratings and meaning RMR Ratings 81-100 61-80 41-60 21-40 <20 Rock Mass Class A B C D E 72 Description very good rock good rock fair rock poor rock very poor rock 8 Sample Preparation, Analyses and Security 8.1 Sampling Governance and Quality Assurance The QPs are satisfied with the standard procedures, which prescribe methods aligned to industry norms. The governance system at the Rustenburg Operations relies on directive control measures and makes use of internal manuals (standard procedures) to govern and standardize data collection, validation and storage. Furthermore, the standard procedures are mandatory instructions that prescribe acceptable methods and steps for executing various tasks relating to the ongoing gathering, validation, processing, approval and storage of geological data, which is utilised for Mineral Resource estimation. In addition to internal standard procedures, Sibanye-Stillwater implements an analytical quality control protocol that assesses the extent of contamination and analytical precision at the laboratory. Batches of samples sent to the laboratory include routine “blank” samples (Magaliesburg quartzite) and certified reference material (CRM). Results of the analytical quality control are discussed in Section 8.5.2. The governance system also emphasizes training to achieve the level of competence required to perform specific functions in data gathering, validation and storage. Extensive on the job training of new geologists, who will eventually be responsible for logging and sampling, is performed. Lithological data is acquired through the logging of drill core recovered from underground drilling. The logging is undertaken by trained geologists, who are familiar with the various reefs, footwall and hangingwall stratigraphy and rock types. The core logging is also guided by existing drillhole information from previous core logging. Routine validations are undertaken by the experienced Geologists at various stage gate points in the data collection process flows, with the ultimate validation performed by the QPs. The QPs note that the internal peer review of the data facilitates the early detection of material errors in the data capture before the collection is finalized. Another aspect of the governance system is the documentation of the geological data gathering process flow (i.e., data collection, processing and validation). The QPs acknowledge that this documentation facilitates the auditability of the process flow activities and outcomes, as well as the measures undertaken to rectify anomalous or spurious data. The historic surface core is stored at Central Facility in the Waterval Core yard, near Rustenburg. Storage facilities are fenced off to prevent unauthorized entry, with limited access. 8.2 Reef Sampling – Surface The surface drilling core is sampled using a comprehensive standard procedure which entails comprehensive QAQC procedures in the process. The core is split in half where one half is retained for reference whereas the other half is sent to the laboratory for analysis. Samples include bottom and top contacts together with 2cm of footwall and minimum of 2cm of hangingwall with the contact samples being no less than 10cm. In addition, at least one sample of unmineralized footwall and hangingwall is included. Samples are broken into individual pieces no less than 20cm for BQ core size
73 to ensure enough material is available for analysis. Furthermore for BQ size core, the entire drill core sample is submitted to the analytical laboratory and no core splitting is performed. 8.3 Reef Sampling – Underground 8.3.1 Core Samples At the Rustenburg Operations, currently, only vertical holes drilled in haulages/crosscuts are sampled. Samples include bottom and top contacts together with 2cm of footwall and a minimum of 2cm of hangingwall, with the contact samples being no less than 10cm. In addition, at least one sample of unmineralized footwall and hangingwall is included. Samples are broken into individual pieces no less than 20cm for BQ core size to ensure enough material is available for analysis. The entire drill core sample is submitted to the analytical laboratory and no core splitting is performed. The samples are assigned unique sample identification numbers and tags before the Evaluation Team Leader transports them to the laboratory. In addition, the samples for each drillhole and the associated quality control samples (CRM and blanks) are submitted to the laboratory. The geologists prepare sample submission sheets that accompany the samples. Records of the sample data are captured in the SABLE database. 8.3.2 Channel Sampling Within underground workings, exposures of the reef have channel samples taken. Individual channels are cut from the underground development-working faces using a diamond saw. A representative section of the target reef intersection should be recorded in the field book and the respective sample numbers, relative to their sequential position, should be reflected relative to the profile, from footwall to hangingwall. The Rustenburg Operations development channel sampling interval standards vary per shaft and facies. For the UG2 Reef at all shafts samples are taken at 30m intervals on dip and the strike component varies by mining method. For the Merensky Reef, samples are taken at 5m intervals on dip at the western shafts and 10m at the eastern shafts. Channels are defined perpendicular to the reef plane and each section’s position is fixed by offsetting from survey pegs. The reef is segregated according to a sampling pattern and is correlated between sample sections, and individual samples of 10cm – 15cm in length are taken to reflect the internal geometry of the reef, with not less than a 10cm sample being taken on top and bottom contacts. The sample mass taken is in the order of 300 g to 500g. The data is stored in one database but linked to the assay laboratory automatically via a second system. The following capture process is followed: The sampling data captured in MRM System which is linked to Sable Database. Sable is used to submit samples to the laboratory via an automated process. The laboratory uses Laboratory Information Management System (LIMS) which then reports the results automatically back into Sable where QAQC is done. Once QAQC is completed, the information is relayed back into the MRM system. At the operations, the MRM data is authorised before it used for evaluation. 74 8.4 Sample Preparation and Analysis 8.4.1 Laboratory The surface and underground sampling assays are analysed by various International Organisation for Standardisation (ISO) accredited laboratories for the Rustenburg Operations. The following ISO accredited laboratories have been utilised since January 2010: • Anglo American Research Laboratory (AARL), • Genalysis Laboratory Services (SA) (Pty) Limited (Genalysis), • SGS South Africa (Pty) Ltd (SGS), • Mintek (Pty) Limited (Mintek), • SetPoint Industrial Technology (Pty) Limited (Setpoint) and • Quality Laboratory Services Limited (QLS). All current Rustenburg Operations samples are analysed at Quality Laboratory Services, an independent South African National Accreditation System (SANAS) accredited laboratory (SANAS17025) for geochemical analysis (4E, 6E and Ni and Cu). The laboratory has facilities for sample preparation, chemical analysis (via fire assay and instrumental techniques) and is equipped with the LIMS software, which facilitates effective and efficient management of samples and associated data. It handles geological drilling and grade control samples as well as samples from the concentrators, smelter and base metal refinery. 8.4.2 Sample Preparation and Analysis Samples received at the laboratory are labelled with a unique laboratory identifier and logged into a Laboratory Information Management System (LIMS) which also generate a unique LIMS ID. The samples are then emptied into a drying pan and dried to a constant mass in drying ovens at 105°C. After drying, the sample is pulverised to a 95% pass rate on a -75µm and emptied into a labelled sample bag for further processing. Samples are assayed for 6E (Pt, Pd, Rh, Au, Ru & Ir), Cu, Ni and density. PGMs and Au contained in concentrate samples are collected in a single fusion step, using nickel sulphide (NiS). The resulting NiS buttons are subjected to leaching and filtration processes to separate the PGMs and Au. The PGMs and Au are dissolved using aqua regia. The resulting solutions are analysed by Inductively Coupled Plasma (ICP) to determine the concentrations of Pt, Pd, Rh, Ir, Ru and Au contained in a sample. Cu and Ni are analysed using sodium peroxide and sodium carbonate fusion to decompose the sample. Nitric acid is added to dissolve the fused sample. The cooled solutions are transferred into labelled 250ml volumetric flasks and send to the ICP for analysis. The determination of density (SG) is achieved by using the AccuPyc 1340 Pycnometer which is a fully automated gas displacement pycnometer. Density and volume are determined by pressure change of helium within calibrated volumes. Assays, including the results from laboratory internal standards, are reported within one to three months turn-around time. QLS laboratory has in place quality assurance and control procedures for the analysis and handling of the samples. An overall high level of cleanliness is maintained to minimize contamination. Furthermore, 75 the laboratory also included standards and blanks in each sample batch and any anomaly identified in the quality control samples is addressed as required. The QAQC procedures include regular audits, Proficiency Testing Schemes, round-robin benchmarking, as well as the submission of blanks and standards to the laboratory. In addition to external audits, the Mine Technical Services Management (MTS) Department conducts regular audits of the laboratory. 8.4.3 QP Opinion The QPs are satisfied with the sample preparation, analytical methods, accuracy and precision and the level of cleanliness at the analytical laboratory. The analytical methods employed are suited to the mineralization style and grades. Accordingly, the analytical data from the laboratory is suitable input for grade estimation. Note on historical assays: Assay procedures used at Rustenburg are well-established procedures and have been used in South African mines for many decades. The results are well validated and changes in procedures over time have not significantly affected the accuracy and comparability over the life of the mine. 8.5 Analytical Quality Control 8.5.1 Nature and Extent of the Quality Control Procedures Rustenburg Operations implements an analytical quality control protocol requiring ongoing monitoring of laboratory performance. Adhoc and unannounced visits are done to the laboratory to check all the processes taking place at the laboratory. 8.5.2 Quality Control Results Analytical results for the blank and standards are analysed graphically on control charts to facilitate the identification of anomalous data points. Where the standard result is reported outside three standard deviations of certificate value, re-assay is requested for the whole batch from the laboratory. A sufficient number of standards and blanks are inserted into the sample stream (equivalent to between 5% and 15% of all samples). Standards consist of in-house standards as well as external ‘AMIS’ CRMs. All in-house standards have been South African Bureau of Standards (SABS) certified using a round robin process. The blank material utilised has no certified value, and the blank sample data is analysed visually on plots to identify anomalous values that may suggest overwhelming contamination or sample swapping. Blank samples are accepted to 0.25g/t after which re-assay is requested. Figure 24 and Figure 25 show the typical control plots of a CRM and a blank used to assess the quality of assay results for February 2019 to February 2020. 76 Figure 24: Example of CRM Result Monitoring Figure 25: Example of Blank Result Monitoring
77 8.5.3 QP Opinion Based on the foregoing, The QP concludes that the laboratory’s analytical data shows overall acceptable precision and accuracy, and no evidence of overwhelming contamination by the laboratory that would affect the integrity of the data. As a result, the analytical data from the in-house laboratory is of acceptable integrity and can be relied upon for Mineral Resource estimation. 78 9 Data Verification 9.1 Data Storage and Database Management Procedures are in place to ensure the accuracy and security of the databases. Mine data are split into two databases: exploration drilling and underground sample sections. All the surface and underground exploration drilling data is captured and stored using SABLE Data Warehouse software. The underground sample section data is stored in a separate database known as the MRM database. However, a new interface has now been created between the MRM and SABLE Databases such that all laboratory dispatches of the MRM data are done through SABLE where QAQC analysis for the MRM data is carried out in SABLE. The SABLE database administrator oversees data management procedures while the database manager on-site oversees exploration drillhole data. Data capture is continuous, regularly monitored and validated. Information stored in the database includes collar coordinates, dates of completion of each stage, survey data, lithological logging, alteration logging, structural logging, mineralisation, core size, sampling, CRM information and assay data. The SABLE database is stored on the central IT server, where it is backed up and has rigorous controls (e.g., password protection and access restrictions) to ensure the security and integrity of the data. The QPs are satisfied with data storage and validation as well as database management practices, which are all aligned to industry practice. There are sufficient provisions to ensure the security and integrity of the data stored in the SABLE database. 9.2 Database Verification Internally generated channel samples, underground definition drillhole and mapping data is the primary data utilised for geological interpretation and Mineral Resource estimation. This data has been generated over a lengthy period of time. The imports into the database and validations are performed by experienced personnel. The QPs did not perform independent verifications of the data collected for the purposes of this Technical Report Summary but relied on the rigorous validations performed during data collection and processing to which they participated. They also scrutinised historical data and associated QAQC reports to ascertain the integrity of the historical data and its suitability for Mineral Resource estimation. The Mineral Resource estimates for Rustenburg Operations are mainly based on validated drillhole and channel data, which is stored in the SABLE database. For the 2021 Mineral Resource estimation at Rustenburg Operations, data pertaining to 27,116 data points were used for the Merensky Reef model and 14,818 for the UG2 Reef model. 9.2.1 Mapping • The principal objectives of underground mapping are to: o Identify and record the positions of faults, dykes and any other disturbances in a working place, so that projections can be made ahead of the face and/or up-to reef plane. o Record the thickness and nature of the reef so that facies can be delineated and later reconciled with sampling data. 79 o Record and bring to the attention of the Mining Department any areas where reef remains in the hanging or footwall of the stope and/or new geological structures identified. • Mapping is carried out continuously, using a set of documented procedures, and plans updated as data is collected and • Mapping is checked underground by the responsible geologist when conducting start-up assessments. The responsible geologist will print a plan when proceeding underground and will ensure that the geological mapping is correct and that all features are recorded. All underground mapping information is captured in the Microstation system. 9.2.2 Drillholes The validation of drillhole data is a continuous process completed at various stages during data collection, before and after import into the SABLE database and during geological interpretation and Mineral Resource estimation. As the QPs are fulltime employees of Sibanye-Stillwater working at the Rustenburg Operations, they either performed or supervised the validation of the drillhole data after which they approved and signed-off the validated data used for Mineral Resource estimation. The logging is guided by a standard procedure, which standardizes data gathering, and the type of detail required for each drillhole log, and any deviations or anomalous entries are flagged by the inbuilt validations tools available in the SABLE database. Geologists validate the survey data by comparing it against planned coordinates and through visual checks in the Datamine environment. 9.2.3 Channel Sampling The validation of development samples is a continuous process completed at various stages during data collection. Unique barcoded sample numbers are generated and printed by an external service provider, preventing duplicate ticket numbers. Samples are captured into the MineRP database with controls in place, which includes drawing of sections and validation of location and geology by experienced fulltime employees. Plots using the final authorized assays and location data, along with the workings, are printed to ensure that the spatial distribution is correct. Planned Task Observations are conducted quarterly to ensure sampling procedures are followed correctly. 9.3 QP Opinion The QPs acknowledge the rigorous validation of the extensive database utilised for Mineral Resource estimation at the Rustenburg Operations. The data was validated continuously at critical points during collection, in the SABLE database and during geological interpretation and Mineral Resource estimation. For the recent data, the QPs either participated in or supervised the validations which were performed by suitably trained personnel and approve the use of the validated and signed-off data for Mineral Resource estimation. Similar practices which were inherited by Sibanye-Stillwater were in use by the previous owners for the collection historical data. The QPs have assessed the historical data 80 and concluded that it is suitable for Mineral Resource estimation. In general, the data validations are consistent with industry practice and the quantity and type of data are appropriate for the nature and style of the mineralization. 10 Mineral Processing and Metallurgical Testwork The plant is well established and no changes are planned. Accordingly, there has not been any recent testwork completed for the purposes of process design and metallurgical amenability assessment as these are unnecessary for operating plants. The type of ore material is consistent with historical processing, and any metallurgical testwork conducted is to support short term operational issues. The plant recovery factors are benchmarked to actual recoveries achieved by the plant and there is no material risk to the planned plant recovery factors. There is no metallurgical testwork that is material to the operational this stage of operation. All plant samples are analysed at the Sibanye-Stillwater owned and operated laboratory. The analytical laboratory is a secure facility as it is situated at the neighbouring Marikana Operations which is fenced off to prevent unauthorized entry by the public and where access is restricted to authorized personnel of Sibanye-Stillwater. The laboratory has facilities for sample preparation, chemical analysis (via fire assay and instrumental techniques) and is equipped with the Laboratory Information System (LIMS) software, which facilitates effective and efficient management of samples and associated data. It handles mainly grade control samples in the form of belt sampling and underground channel sampling, as well as samples from the concentrators, smelter and base metal refinery and occasionally drillhole samples. The laboratory has received accreditation from the South African National Accreditation System (SANAS) in August 2021 (T0930). Analyses and sample preparation are described in Section 8.4.2. and are equivalent at the Marikana laboratory as the external laboratory. For ongoing sampling in the plant refer to Section 14. 11 Mineral Resource Estimates Mineral Resources are derived from both underground and surface sources. NOTE: An Integrated single reef Mineral Resource model is constructed combining the UG2 Reef at both the Rustenburg and neighbouring Kroondal Operations. However, Mineral Resources are divided and reported within their respective boundaries. 11.1 Estimation Domains 11.1.1 Compositing Selection criteria for composites is based on a minimum mining width of 105cm, a well-defined marker horizon(s) in the economic zones and geotechnical requirements of the hangingwall. There is no
81 maximum mining width. While no cut-off grade is used, the areas with variable width are composited to include as much of the mineralized material as possible within the geotechnical constraints. Where the chromitites are less than the minimum mining width the additional thickness is taken in the footwall. For an explanation of why no cut-off grade is used see Section 11.3.2.2. 11.1.1.1 Merensky Reef The mineralisation in the Merensky Reef has the highest PGM concentrations associated with narrow chromitite layers (Upper-, Lower- and Basal-chromitite). The PGM mineralisation generally diminishes into the enclosing pyroxenite, but becomes rapidly depleted when approaching the hangingwall norite and footwall norite. A minimum composite cut of 105cm was modelled for all thin reef Geozones. The composite boundary includes the Merensky Hangingwall, Merensky Reef and Footwall component. Figure 26 shows the Merensky Reef geozones. A variable composite boundary was applied for the thick Geozone 8 that includes the Merensky reef and 20cm hang and 20cm footwall. 82 Figure 26: Merensky Reef Geozones Analysis of the grade distribution for the composite cut selection was done using histograms produced from the Datamine system. The distributions of 4E grade referenced on different lithological markers were visually inspected in the histograms (Figure 27) to determine the limits of the best average composite for each data intersection based on a minimum mining width of 105cm. The composite is used in the Mineral Resource estimation. Section plots were completed per geozone to investigate different cut s scenarios, with one scenario illustrated as shown in Figure 28. 83 Figure 27: Example of a Merensky Reef Composite Definition 84 Figure 28: Example of a Merensky Reef Composite - Section Plot 11.1.1.2 UG2 Reef Composites per lithological unit (i.e. drillhole and channel sample data composted by lithology) are used to inform the Mineral Resource model. Composite boundaries are determined by geological contacts and grade distribution for the following primary components: • Geotech Component – Chromitite Layers- not always developed, • Main Seam, and • Footwall Unit. A minimum thickness of 105cm is modelled for the Rustenburg Operations (Figure 29). The composites include Main Seam, 10cm (minimum) Footwall Pegmatoid, Chromitite Layers (geotechnical component, (see Figure 30). M in m in in g
85 Figure 29: Example of UG2 Reef Composite cuts for different areas in Rustenburg 86 Figure 30: UG2 Reef Mineral Resource Composite . 11.1.2 Estimation Domains 11.1.2.1 Merensky Reef The Merensky Reef has predominantly hard (constrained) geozone boundaries, which means that only the composites within a geozone boundary will inform estimates for the applicable geozone. The facies classification is based on a combination of lithology, the thickness of the Merensky Reef and the PGM value distribution. For the Merensky Reef, the estimation domains are defined by facies and resource cut. The composites include the Merensky hangingwall, Reef and Footwall components. A variable mining cut was modelled for the thick reef facies that includes the reef, hangingwall and footwall components. Geozones for the Merensky Reef are shown in Figure 31. A total of 15 geozones have been interpreted. Geozones 2, 9 and 16 have been mined out. 87 Figure 31: Merensky Reef Geozones Descriptions of the geozones currently being mined at the Rustenburg Operations are given below with corresponding geozones from Figure 31 above. Thembelani Thick Geozone (Geozone 8) The Thembelani Thick Geozone is characterised by a pegmatoidal feldspathic pyroxenite with thicknesses ranging from 0.7m to 0.9m and PGM grades ranging between 6g/t and 8g/t over the resource cut. It has a top chromitite layer and also two interstitial chromitite layers. The reef stabilises on a 5cm to 10cm thick anorthosite layer. The hangingwall stratigraphy of the reef is a medium-grained feldspathic pyroxenite which is 1m to 1.2m thick. The feldspathic pyroxenite is in turn overlain by leuconorite. 88 Thembelani/Khuseleka Rolling Geozone (Geozones 3&6) The lithological description of Thembelani Rolling Geozone is similar to the Thembelani Thick Geozone. The differences however lie in the grade and thickness, which are 5.52 g/t 4E over a thickness that varies between 0.3m to 0.4 m. The Merensky Rolling Geozone is characterised by a medium to course-grained pegmatoidal plagioclase pyroxenite with shallow dipping pothole. The amplitude and wavelength of the rolls vary between 4m to 6 m. These Merensky geozones have a well defined top chromitite contact and a poorly developed bottom contact. The reef is overlying approximately 5cm thick anorthosite (FW1a) which in turn is underlain by the approximately 5m thick leuconorite (FW1b). Thembelani Thin Geozone (Geozone 7, 10, 11&12) The Thembelani Thin Geozone has well-developed top and bottom chromitite layers bounding a 0.15m to 0.20m thick pegmatoidal felsphathic pyroxenite. The lithology in the footwall and the hangingwall are the same as that of Thembelani Thick Geozone and Thembelani Rolling Geozone. The Thembelani Thin Geozone has an average 4E grade of 7.04g/t over the resource cut. Khuseleka / Thembelani Contact Geozone (Geozone 4&6) The contact geozone is characterised by a single chromitite layer, which is approximately 3cm thick. This chromitite layer is overlain by a feldspathic pyroxenite which is 60cm to 100cm thick. The footwall stratigraphy to the reef is an anorthosite that is up to 4m thick. The contact geozone has an average 4E grade of 2.56g/t over the composite boundary. 11.1.2.2 UG2 Reef Geozones The UG2 facies classification (Figure 32) is based on a combination of thickness and the PGM value distribution. For the UG2 Reef, the estimation domains are defined by facies and resource cut. The width of the reef between the facies varies from 71cm for facies 4 to 85cm for facies 1. A minimum composite thickness of 105cm was modelled for the conventional mines. The variable width composite includes the UG2 Main seam, 10cm (minimum) Footwall Pegmatoid and the Geotech component. A High Profile minimum composite thickness of 186cm was modelled for the mechanised mines where a low profile trackless mining method is applied. The variable width composite includes UG2 Main seam, 10cm (minimum) Footwall Pegmatoid, Leader Seam and parting width between the UG2 Main Seam and Leader. The area of the Mineral Resource blocks was corrected for the dip and discounted for geological losses based on the 3D structural interpretation. From the resultant dip corrections and density data, volume and tonnage are calculated. Estimation domains were used as hard boundaries in the estimation for the 125m by 125m and 500m by 500m blocks.
89 Figure 32: UG2 Reef Geozones Geozone 1 Thick Reef In Geozone 1, the Main Seam has an average 4E grade of 5.66g/t over the thickness of 85cm. In this zone, the Leader band is included as part of the geotechnical unit. The Leader band has an average 4E grade of 2.92g/t over an average thickness of 24cm. The average 4E grade of the footwall over a thickness of 40cm is 0.55g/t. The minimum and maximum SG are 3.68g/cm3 and 4.58g/cm3, respectively. Geozone 2 Normal Reef Geozone 2 has an average Main Seam thickness of 70cm with an average 4E grade of 6.72g/t. The Leader Seam varies between 10cm to 20cm with an average 4E grade of 2.57g/t. No geotechnical parting is included in Geozone 2. The footwall has an average 4E grade of 0.91g/t. The minimum and maximum SG are 3.22g/cm3 and 5.23g/cm3, respectively. 90 Geozone 3 Thin Reef The UG2 Main Seam, referred to as Thin reef, in Geozone 3 has an average 4E grade of 6.87g/t over an average thickness of 64cm. In Geozone 3, the Leader band is narrowing down dip to less than 10cm and is included in the resource cut. The Leader Seam has an average 4E grade of 1.03g/t. The footwall has an average grade of 1.56g/t. The minimum SG is 3.57g/cm3 whereas the maximum SG is 5.08g/cm3. Geozone 4 Central Reef Geozone 4, the UG2 Main Seam has an average thickness of 71cm and an average grade of 6.39g/t. The minimum SG is 3.57g/cm3 and the maximum SG is 5.65g/cm3. Geozone 5 Upper Reef The Upper Reef of Geozone 5 has an average 4E PGM grade of 6.31g/t over an average thickness of 77cm. This Geozone includes a mixture of Leader Seam and/or triplet stringer chromitites, depending on where the geotechnical beam is found in the hangingwall stratigraphy. The minimum SG is 3.16g/cm3, whereas the maximum SG is 5.18g/cm3. 11.1.2.3 Tailings Storage Facility For the TSF estimate, the distribution of values follows a spatial trend rather than abrupt boundaries. There is only one statistical domain. 11.2 Estimation Techniques 11.2.1 Grade and Tonnage Estimation 11.2.1.1 Statistics and Capping The primary software used was Datamine Studio RM for estimation and Snowden Supervisor for statistics and variogram fitting. The Mineral Resource footprint was divided into various estimation domains based on the geological facies. The constraints of the geological facies differ between reefs. Detailed exploratory data analysis included sample verification, histogram and cumulative distribution plots. No declustering was applied for variography. No cutting or capping was applied to the 4E grade and width for both the Merensky and UG2 Reef as there were no extreme values in the distributions (Figure 32 and Figure 33). Cuts and caps did apply for the Prill Element (Pt, Pd, Rh and AU), Base Metal (Cu+Ni) on TSF and on lithological units above and below the UG2 Reef. The capping was generally applied at the 99th percentile per domain to reduce the effects of extremely high grades on each estimated panel. 91 Figure 33: Some Histograms of the UG2 Reef 92 Figure 34: Some Histograms of the Merensky Reef 11.2.1.2 Variogram Modelling and Estimation Parameter Selection The variography analyses for the Merensky and UG2 Reefs individual geozones was conducted using the validated composites for the combined underground channel and surface drillhole data. No transformation of the data was applied to the variograms as the data distribution approaches a normal distribution for thickness, grade and accumulation where there are sufficient composites. The variograms were treated as isotropic due to the absence of anisotropic trends which is a common phenomenon of the PGM Reefs within the Bushveld Complex. No convincing anisotropic effect was noticed as depicted in the example in Figure 35. Variogram parameters used for kriging are available in Table 21 to Table 23. Snowden Supervisor is used for variogram maps( Figure 35), and variography as per examples in Figure 36.
93 Figure 35: Example of a Variogram Map Figure 36: Example of Variogram for 4E Grade and Thickness 94 Table 21: Summary of Variogram Model Parameters for the Merensky Facies PARAMETERS FACIES VREFNUM VANGLE1 NUGGET ST1PAR1 ST1PAR2 ST2PAR1 ST2PAR2 ST3PAR1 ST3PAR2 PRP0000 3 3.11 -90 0.18 16.5 16.5 276.5 276.5 1643.5 1643.5 PGE0000 3 3.12 -90 0.67 107 107 1018 1018 PGE30105 3 3.2 -90 0.5 50.5 50.5 365 365 809.5 809.5 PT30105 3 3.4 -90 0.62 83 83 567 567 1446 1446 PD30105 3 3.5 -90 0.68 209.5 209.5 885 885 RH30105 3 3.6 -90 0.71 166 166 944.5 944.5 AU30105 3 3.7 -90 0.73 110.5 110.5 797 797 CU30105 3 3.8 -90 0.58 33 33 852 852 NI30105 3 3.9 -90 0.57 99.5 99.5 472 472 1036.5 1036.5 PRP0000 6 6.11 -90 0.44 79 79 275 275 810.5 810.5 PGE0000 6 6.12 -90 0.77 25 25 87 87 795.5 795.5 PGE40105 6 6.2 -90 0.68 82.5 82.5 677 677 PT40105 6 6.4 -90 0.71 22.5 22.5 629.5 629.5 PD40105 6 6.5 -90 0.57 79 79 614.5 614.5 RH40105 6 6.6 -90 0.52 45 45 892 892 AU40105 6 6.7 -90 0.45 41.5 41.5 617.5 617.5 CU40105 6 6.8 -90 0.66 28.5 28.5 752.5 752.5 NI40105 6 6.9 -90 0.6 82 82 646.5 646.5 PRP0000 7 7.11 -90 0.27 47.5 47.5 472 472 1101.5 1101.5 PGE0000 7 7.12 -90 0.67 38.5 38.5 263.5 263.5 771 771 PGE30105 7 7.2 -90 0.69 688 688 1158 1158 PT30105 7 7.4 -90 0.53 79.5 79.5 812.5 812.5 PD30105 7 7.5 -90 0.7 439 439 879.5 879.5 RH30105 7 7.6 -90 0.6 135.5 135.5 787 787 AU30105 7 7.7 -90 0.41 329.5 329.5 863.5 863.5 PGE0000 8 8.11 -90 0.53 118 138.5 1937.5 1163 PRP0000 8 8.12 -60 0.05 853.5 154.5 2291 679.5 PRP2020 8 8.41 -60 0.07 449 155.5 2703 516.5 MGT20PGE 8 8.43 -90 0.61 12 12 112.5 112.5 1098 1098 MGT20PRP 8 8.82 -60 0.07 449 155.5 2703 516.5 MGT20PT 8 8.51 -90 0.72 75 75 834.5 834.5 MGT20PD 8 8.52 -90 0.72 63.5 63.5 1107 1107 MGT20RH 8 8.53 -90 0.71 35 35 82.5 82.5 1136 1136 MGT20AU 8 8.54 -90 0.51 98.5 98.5 1507 1507 PRP0000 11 11.11 -90 0.28 106.5 106.5 386 386 1761.5 1761.5 PGE0000 11 11.12 -90 0.7 10.5 10.5 417 417 1138 1138 PGE40105 11 11.2 -90 0.7 64 64 1250 1250 PT40105 11 11.4 -90 0.76 156 156 1940.5 1940.5 95 PARAMETERS FACIES VREFNUM VANGLE1 NUGGET ST1PAR1 ST1PAR2 ST2PAR1 ST2PAR2 ST3PAR1 ST3PAR2 PD40105 11 11.5 -90 0.73 72.5 72.5 1615.5 1615.5 RH40105 11 11.6 -90 0.56 122.5 122.5 1528.5 1528.5 AU40105 11 11.7 -90 0.66 72.5 72.5 407 407 1937.5 1937.5 CU40105 11 11.8 -90 0.64 97 97 364.5 364.5 2796.5 2796.5 NI40105 11 11.9 -90 0.73 84 84 301 301 1957.5 1957.5 PRP0000 12 12.11 -90 0.36 36 36 1170 1170 PGE0000 12 12.12 -90 0.44 63.5 63.5 313 313 822.5 822.5 PGE40105 12 12.2 -90 0.29 52.5 52.5 327 327 1322 1322 PT40105 12 12.4 -90 0.29 63.5 63.5 573 573 974 974 PD40105 12 12.5 -90 0.28 74 74 355 355 1125 1125 RH40105 12 12.6 -90 0.24 355 355 1107.5 1107.5 AU40105 12 12.7 -90 0.39 40.5 40.5 850.5 850.5 CU40105 12 12.8 -90 0.47 308.5 308.5 978 978 NI40105 12 12.9 -90 0.34 361 361 1018.5 1018.5 Table 22: Summary of Variogram Model Parameters for all the UG2 Facies FACIES VREFNUM VANGLE1 NUGGET ST1PAR1 ST1PAR2 ST2PAR1 ST2PAR2 ST3PAR1 ST3PAR2 PGE 1 1 -90 0.59 8 8 245.5 245.5 808.5 808.5 PERPLENG 1 2 -90 0.2 61 61 349 349 654.5 654.5 PT 1 4 -90 0.71 133 133 467 467 PD 1 5 -90 0.55 33.5 33.5 325.5 325.5 RH 1 6 -90 0.62 96.5 96.5 583.5 583.5 AU 1 7 -90 0.47 34.5 34.5 355.5 355.5 CU 1 8 -90 0.23 70.5 70.5 650.5 650.5 NI 1 9 -90 0.06 88.5 88.5 650.5 650.5 PGE 2 11 -90 0.45 37.5 37.5 402 402 729 729 PERPLENG 2 12 -90 0.37 22.5 22.5 83.5 83.5 1273.5 1273.5 PT 2 14 -90 0.44 80 80 860.5 860.5 PD 2 15 -90 0.57 13.5 13.5 164 164 683 683 RH 2 16 -90 0.29 64 64 1488 1488 AU 2 17 -90 0.31 113.5 113.5 951 951 CU 2 18 -90 0.22 96 96 1765.5 1765.5 NI 2 19 -90 0.16 129 129 917 917 PGE 3 21 -90 0.57 0.15 0.15 207.5 207.5 1837 1837 PERPLENG 3 22 -90 0.38 37.5 37.5 298.5 398.5 1553 1553 PT 3 24 -90 0.36 39 39 316.5 316.5 2266.5 2266.5 96 FACIES VREFNUM VANGLE1 NUGGET ST1PAR1 ST1PAR2 ST2PAR1 ST2PAR2 ST3PAR1 ST3PAR2 PD 3 25 -90 0.54 28.5 28.5 43 43 1393 1393 RH 3 26 -90 0.31 80 80 423.5 423.5 1871 1871 AU 3 27 -90 0.5 41.5 41.5 282.5 282.5 812.5 812.5 CU 3 28 -90 0.3 64 64 719 719 2381.5 2381.5 NI 3 29 -90 0.42 46 46 347.5 347.5 2171 2171 PGE 4 31 -90 0.61 46.5 46.5 1744 1744 PERPLENG 4 32 -90 0.31 57 57 497.5 497.5 1285 1285 PT 4 34 -90 0.4 46.5 46.5 1373 1373 PD 4 35 -90 0.52 642.5 642.5 1399 1399 RH 4 36 -90 0.32 52 52 321 321 2114 2114 AU 4 37 -90 0.49 39.5 39.5 286 286 984.5 984.5 CU 4 38 -90 0.28 44.5 44.5 276.5 276.5 977.5 977.5 NI 4 39 -90 0.31 31 31 404 404 1185 1185 PGE 5 41 -90 0.54 64 64 1204.5 1204.5 PERPLENG 5 42 -90 0.62 90.5 90.5 268.5 268.5 1191.5 1191.5 PT 5 44 -90 0.61 52.5 52.5 283 283 1251.5 1251.5 PD 5 45 -90 0.56 74 74 1088 1088 RH 5 46 -90 0.56 71.5 71.5 591 591 1372.5 1372.5 AU 5 47 -90 0.39 49 49 1283.5 1283.5 CU 5 48 -90 0.54 52.5 52.5 335 335 NI 5 49 -90 0.48 45 45 1346.5 1346.5 Table 23: Estimation Parameters for the Tailings Storage Facility ASSAY VREFNUM VANGLE1 NUGGET ST1PAR1 ST1PAR2 ST1PAR3 ST1PAR4 ST2PAR1 ST2PAR2 ST2PAR3 ST2PAR4 PGE 2 -90 0.13 40 31.5 17 0.38 118 80 21 0.23 PT 3 -90 0.12 59.5 38.5 18 0.47 117.5 115.5 19.5 0.24 PD 4 -90 0.1 45 111 18 0.64 88.5 117.5 21 0.26 RH 5 -90 0.13 83.5 76 17 0.37 90.5 76.5 18.5 0.28 AU 6 -90 0.13 124.5 113 28.5 0.48 233.5 18.5 33.5 0.39 CU 7 -90 0.13 34 75 18 0.35 94.5 82.5 19.5 0.52 NI 8 -90 0.13 59 114 19.5 0.23 132 122.5 21 0.67
97 Kriging Neighbourhood Analysis (KNA) is a tool that assists in determining the appropriate estimation parameters as per the examples below. KNA determined appropriate block sizes of 125m x 125m and 500m x 500m blocks (Figure 37 and Figure 38). The QP has chosen to use 125m x125m for the well- informed current mining areas and 500m x 500m for the deeper areas for both Merensky and UG2 Reefs. The KNA for the number of samples for the 125m x 125m blocks provides the KE vs. SR relationship. Table 24 shows the parameters used in modelling. Figure 37: KNA for Block Sizes – Well Informed Blocks Figure 38: KNA for Discretization – Poorly Informed Blocks 98 Table 24: Kriging Parameters Data Block Size Minimum number of samples Maximum number of samples Search Volume No. 2 Minimum number of samples Maximum number of samples Search Volume No. 3 Minimum number of samples Maximum number of samples Point Data Point Data 125m x 125m 7 20 1.5 7 20 50 20 Point Data Point Data 500m x 500m 7 20 1.5 7 20 50 20 11.2.1.3 Interpolation Methods Estimation by ordinary kriging (OK) was done for elements with sufficient data, and ID2 (Inverse distance to the power of two) estimates for elements with limited data. No arithmetic mean values were applied to the model blocks. A 2D block modelling approach was used. Smaller blocks of 125m by 125m were used in well-informed areas and bigger blocks of 500m by 500m were used in the deeper areas based on a KNA Study. The QP validated the block models on several levels including visual checks comparing block grades to sample grades, section plots comparing model grades to actual sampling grades, as well as reconciliations comparing previous estimations to the current estimation. An example of a section plot and data versus modelled visual plots that were used for validation is shown in Figure 39 and Figure 40. In addition, block comparisons showing the previous versus new models were completed and are shown in Figure 41 for the UG2 Reef. 99 Figure 39: Section Plot UG2 Reef – Data versus Model 100 Figure 40: Section Plot Merensky - Data versus Model
101 Figure 41: UG2 Reef grade -4E –Data (points) versus Model 11.2.2 Grade Control and Reconciliation Grade control and reconciliation practices follow similar procedures to those applied elsewhere in Bushveld Complex platinum mining operations. The reefs, hanging wall and footwall lithologies are visually identifiable, and channel sampling ensures that the face grade is monitored accordingly. As part of the reconciliation exercises, physical factors, including channel width, stoping width, dilution, and Mine Call Factor (MCF) are monitored and recorded on a monthly basis. These results are used to reconcile Resource and Reserve estimates with actual mined tonnages and grades. Monthly evaluation is carried out by means of histograms drawn from the Mineral Resource model that evaluate the current mining block against the business plan. Histograms are updated from the block model periodically updated Mineral Resource models. Belt sampling is performed daily at all shafts for both reefs to verify underground grades. Stoping and development are measured monthly to provide an accurately broken ore tonnage and 4E PGM Oz estimate that is compared to the tonnes hoisted trammed and milled on a monthly basis. 102 The 4E PGM grade accounted for by the Plant is in turn compared to the Survey Called For grade to determine the MCF. The underlying grade control and reconciliation processes are considered appropriate by the QP. 11.3 Mineral Resource Classification 11.3.1 Classification Criteria The Mineral Resource is reported as in-situ Mineral Resource inclusive and exclusive of Mineral Reserves. The Mineral Resource is classified with varying levels of confidence ranging from Measured, high confidence, in current mining and sampling areas to Inferred, lower confidence, in areas further away from current workings. The Mineral Resource classification is determined using the classification matrix method, which has been implemented across the PGM operations of Sibanye-Stillwater. It consists of various geological and statistical components. The following geological parameters are considered into the different frameworks (Table 25) Table 25: Confidence Levels for Key Criteria for Mineral Resource Classification Items Discussion Confidence Aeromagnetic survey Available aeromagnetic data is available and data appears of reasonable quality and has been derived from internationally recognized and procedures and techniques. High Seismic interpretation Available seismic data is available and data appears of reasonable quality and has been derived from internationally recognized and procedures and techniques. High Structural model Stratigraphic definition and delineation are considered of reasonable quality. Major structures identified. High Facies interpretation Facies definition and delineation are considered of reasonable quality. Major changes to facies model identified. High Historical data Available data appears of reasonable quality and has been derived from internationally recognized and procedures and techniques. High Assay - QAQC QA/QC programme employed. QA/QC monitoring in place and regular follow ups occur with the mine laboratory. Moderate Kriging variance Parameter is based on the standardized kriging variances (KV). Ranked values assigned are where KV<0. 2, the ranked value is given a value of 1 (high confidence); where 0.2≤KV<0.4, a value of 2 is assigned; and where KV≥0.4, a value of 3 is applied (low confidence). Moderate Kriging efficiency Ranked values for kriging efficiency assigned are where KE≥0.5, the ranked value is given a value of 1 (high confidence); where 0.3<KE<0.5, a value of 2 is assigned; and where KE≤ 0.3, a value of 3 is applied (low confidence). Moderate Search volume Ranked values assignment are: first search radii = 1 (high confidence); second search radii = 2; third search radii = 3. High 103 Items Discussion Confidence Number of samples The range between the minimum and maximum number of samples is divided into three and assigned values of 1, 2 and 3 where 1 would represent the maximum number of samples interval. High Regression slope Ranked values assigned are where RS≥0.6 the ranked value is given a value of 1 (high confidence); where 0.2<RS<0.6, a value of 2 is assigned; and where RS≤0.2 a value of 3 is applied (low confidence). Moderate Figure 42 and Figure 43 depict the Mineral Resource Classification for each reef. The Mineral Resource classification for 2021 has not changed from the 2020 Mineral Resource classification. Figure 42: Mineral Resource Classification for the Merensky Reef 104 Figure 43: Mineral Resource Classification for the UG2 Reef 11.3.2 Mineral Resource Technical and Economic Factors 11.3.2.1 Mining Width and Geological Losses The minimum mining width, which represents the minimum practical selection unit, is dependent largely on the mining method and other mining constraints, including rock engineering. For conventional mining methods, the typical minimum mining width used is 105cm in the operating shafts and 186cm for mechanised mining methods in the project areas. The Mineral Resources are discounted for geological losses.
105 Geological losses can be separated into known and unknown losses. Typically, faults and dykes, which have been positioned through various exploration/exposure methods, can be reasonably quantified as known losses and with high or medium degrees of confidence. Where the measurements become conjectural, low confidence is assigned to these losses and would then form part of the unknown loss quantification. Geological losses for UG2 and Merensky Reefs were estimated and signed off by the QP per geological loss domain for each shaft. Losses are estimated in the underground mining operations and are then projected into future mining areas. Additional data sources that include aeromagnetic survey, seismic interpretation and drillhole information are also used for the projected loss estimated and are shown in Figure 44 and Figure 45. The UG2 and Merensky Reefs total weighted average geological loss at the Rustenburg Operations for the remnant resource is 22.32%, representing a 0.19% decrease from the previous year’s geological losses. Figure 44: Total Geological Losses for the Merensky Reef 106 Figure 45: Total Geological Losses for the UG2 Reef 11.3.2.2 Paylimits and Cut-off Grade Historically, SSW has not applied cut-off grades in their Mineral Resource /Mineral Reserve declaration. No cut-off grade is applied to the Mineral Resources quoted due to there being no mining selectivity based on the grades being applied at any of the Shafts at Rustenburg. The ore bodies are continuous and have persistent metal distribution profiles which has been used as the basis for reef identification, modelling and exploitation. To illustrate the prospects of eventual economic extraction at the Mineral Resources cut-off grade calculations were made based on economic, mining and processing assumptions. The metal prices assumed in the calculation are the long-term prices (as at 2022) in Table 26. See 16.4 for a discussion on price determination. 107 Table 26: Commodity Price and Exchange Rate Assumptions for Cut-off Calculations* 6E Metals Units Long Term Prices 2022 Platinum USD/oz 1,500 Palladium USD/oz 1,500 Rhodium USD/oz 10,000 Gold USD/oz 1,800 Iridium USD/oz 3,000 Ruthenium USD/oz 350 ZAR/USD 15.00 A basket price for the 6E metals was calculated by weighting each price by the metal’s contribution to the 6E value for each reef package per individual operation. The contribution of base metals was not considered. The prill splits used per operation are shown in Table 27 Table 27: 6E Prill Split Percentages Applied per Reef Rustenburg MER UG2 Surface Platinum 0.58 0.44 0.55 Palladium 0.25 0.28 0.34 Rhodium 0.04 0.12 0.10 Gold 0.05 0.01 0.01 Iridium 0.02 0.03 Ruthenium 0.07 0.13 Certain parameters were used in the cut-off calculations and include both mining and processing assumptions below and in Section 12.4.2. The first factor used is the Resource to Reserve factor and is calculated by factoring in the percentage of grade lost in the conversion from Mineral Resource to Mineral Reserve grade. Typically, this would be due to dilution, Mine Call Factor and other modifying factors applied to the Mineral Resource. Concentrator recoveries used were based on 2022 budgeted figures per reef type, per operation and represent the average concentrator recovery for the total operation. Net smelter returns are assumed to be the same across the operations, although the material is processed at different facilities. The total mining cost applied per operation were the costs declared in the December 2021 Mineral Resource and Mineral Reserve declaration and were assumed to be the same for both reef types. The parameters assumed for the cut-off calculation for the MR and UG2 packages are detailed in Table 28. 108 Table 28: Parameters Used in the Cut-off Calculation for the MR and UG2 Reef Operation Parameters Unit MR UG2 Rustenburg Total Mining Cost ZAR/t 1,643 1,643 Mining Recovery % 73 66 Plant Recovery % 83 86 Net Smelter Return % 99 99 MCF % 95 96 Based on the parameters assumed above for the cut-off calculation for the MR and UG2 packages, the following cut-off grades were calculated for the three operations, and these are detailed in Table 29. The 6E grades were used in the calculation and reported here as 4E. Table 29: Cut-off Grades Calculated for the MR, UG2 Reef and Surface Operations. Rustenburg MER UG2 Surface Cut-off grade(4E – g/t) 2.98 2.31 0.68 The Mineral Resource tonnes and metals available at the cut-off grades calculated are no different from what is obtained using a 0 g/t cut-off grade. The Mineral Resources at Rustenburg the UG2 has no tonnes/metals below cut-off, only 0.3% of the tonnage in the Merensky below the cut-off. Due to this, all available blocks are reported to be available for mining. 11.4 Mineral Resource Statements 11.4.1 Mineral Resources Mineral Resources are stated as Exclusive (Table 31 and Table 32) and Inclusive of Mineral Reserves (Table 33 and Table 34). Mineral Resources are for in-situ mineralisation (reference point) assessed to have reasonable prospects for economic extraction by the QP. The Mineral Resource as stated is not sensitive to changes in the PGM basket price, nor the ZAR/USD exchange rates. Therefore no sensitivity analysis has been completed for Mineral Resources. The Prill Split for the Mineral Resources is given in Table 30. Table 30: Prill Split Mineral Resources (Inclusive of Mineral Reserves) 4E Prill split Pt % Pd % Rh % Au % UG2 63.67 27.38 3.99 4.97
109 Merensky 52.29 33 13.82 089 Avg 54.99 31.67 11.48 1.86 TSF 54.99 31.67 11.48 1.86 Notes on the Mineral Resource Tabulations: • Mineral Resources are not Mineral Reserves. • Mineral Resources have been reported in accordance with the classification criteria of Subpart 1300 of Regulation S-K. • The attributable Mineral Resource for 2021 is 74% of the total Mineral Resource. Attributable Mineral Resource for 2020 is 100%. • Mineral Resource is calculated on available blocks. Due to non-selective mining, no cut-off grade is applied, no recovery factor is considered at this stage. • AI = Above Infrastructure; BI = Below Infrastructure • Mineral Resources are reported after the removal of geological losses. • Quantities and grades have been rounded to one decimal place; therefore minor computational errors may occur. • Technical and economic factors are discussion in Section 11.3.2. • Risks are Discussed in Section 21. 110 Table 31: Mineral Resources Exclusive of Mineral Reserves as at 31 December 2021 at 100% Classification – 4E PGM Tonnes (Mt) 4E Grade (g/t) 4E (Moz) 21-Dec 20-Dec 21-Dec 20-Dec 21-Dec 20-Dec Underground Measured (AI) 133.4 148.4 5.0 5.0 21.6 23.9 Measured (BI) 106.7 105.4 5.1 5.1 17.6 17.4 Indicated (AI) 60.8 59.2 5.1 5.1 10.0 9.7 Indicated (BI) 51.2 51.1 5.6 5.6 9.2 9.2 Total Measured and Indicated 352.2 364.1 5.2 5.2 58.4 60.2 Inferred (AI) 8.4 8.4 5.7 5.7 1.5 1.5 Inferred (BI) 6.5 6.5 5.5 5.5 1.1 1.1 Total Underground 367.1 379.0 5.2 5.2 61.1 62.9 Total (AI) 202.7 216.0 5.1 5.1 33.1 35.1 Total (BI) 164.4 163.0 5.3 5.3 28.0 27.8 Surface Indicated TSF 0.0 0.0 0.0 0.0 0.0 0.0 Total Surface 0.0 0.0 0.0 0.0 0.0 0.0 Total Resource 367.1 379.0 5.2 5.2 61.1 62.9 Table 32: Attributable Mineral Resource Exclusive of Mineral Reserves as at 31 December2021 Classification – 4E PGM Tonnes (Mt) 4E Grade (g/t) 4E (Moz) 21-Dec 20-Dec 21-Dec 20-Dec 21-Dec 20-Dec Underground Measured (AI) 98.7 148.4 5.0 5.0 16.0 23.9 Measured (BI) 78.9 105.4 5.1 5.1 13.0 17.4 Indicated (AI) 45.0 59.2 5.1 5.1 7.4 9.7 Indicated (BI) 37.9 51.1 5.6 5.6 6.8 9.2 Total Measured and Indicated 260.6 364.1 5.2 5.2 43.2 60.2 Inferred (AI) 6.2 8.4 5.7 5.7 1.1 1.5 Inferred (BI) 4.8 6.5 5.5 5.5 0.8 1.1 Total Underground 271.7 379.0 5.2 5.2 45.2 62.9 Total (AI) 150.0 216.0 5.1 5.1 24.5 35.1 Total (BI) 121.7 163.0 5.3 5.3 20.7 27.8 Surface Indicated TSF 0 0.0 0.0 0.0 0 0.0 Total Surface 0.0 0.0 0.0 0.0 0.0 0.0 Total Resource 271.7 379.0 5.2 5.2 45.2 23.9 111 Table 33: Mineral Resources Inclusive of Mineral Reserves as at 31 December 2021 at 100% Classification – 4E PGM Tonnes (Mt) 4E Grade (g/t) 4E (Moz) 21-Dec 20-Dec 21-Dec 20-Dec 21-Dec 20-Dec Underground Measured (AI) 261.5 261.3 4.7 4.8 39.1 40.3 Measured (BI) 106.7 105.4 5.1 5.1 17.6 17.4 Indicated (AI) 68.5 92.7 5.1 5.2 11.2 15.6 Indicated (BI) 51.2 51.1 5.6 5.6 9.2 9.2 Total Measured and Indicated 487.9 510.5 4.9 5.0 77.1 82.5 Inferred (AI) 8.4 12.9 5.7 5.6 1.5 2.3 Inferred (BI) 6.5 6.5 5.5 5.5 1.1 1.1 Total Underground 502.8 529.9 4.9 5.1 79.8 86.0 Total (AI) 338.3 366.9 4.8 4.9 51.9 58.3 Total (BI) 164.4 163.0 5.3 5.3 28.0 27.8 Surface Indicated TSF 48.5 60.5 1.1 1.1 1.7 2.1 Total Surface 48.5 60.5 1.1 1.1 1.7 2.1 Total Resource 551.3 590.4 4.6 4.6 81.6 88.1 Table 34: Attributable Mineral Resource Inclusive of Mineral Reserves as at 31 December 2021 Classification – 4E PGM Tonnes (Mt) 4E Grade (g/t) 4E (Moz) 21-Dec 20-Dec 21-Dec 20-Dec 21-Dec 20-Dec Underground Measured (AI) 193.5 261.3 4.7 4.8 28.9 40.3 Measured (BI) 78.9 105.4 5.1 5.1 13.0 17.4 Indicated (AI) 50.7 92.7 5.0 5.2 8.3 15.6 Indicated (BI) 37.9 51.1 5.6 5.6 6.8 9.2 Total Measured and Indicated 361.0 510.5 4.9 5.0 57.1 82.5 Inferred (AI) 6.2 12.9 5.7 5.6 1.1 2.3 Inferred (BI) 4.8 6.5 5.5 5.5 0.8 1.1 Total Underground 372.1 529.9 4.9 5.1 59.1 86.0 Total (AI) 250.4 366.9 4.7 4.9 38.4 58.3 Total (BI) 121.7 163.0 5.3 5.3 20.7 27.8 Surface Indicated TSF 35.9 60.5 1.1 1.1 1.3 2.1 Total Surface 35.9 60.5 1.1 1.1 1.3 2.1 Total Resource 407.9 590.4 4.6 4.6 60.4 88.1 112 Figure 46: Conversion of Mineral Resource to Mineral Reserve For the Rustenburg Operations Mineral Resource to Mineral Reserve Reconciliation, the starting point shows the total Mineral Resource (after removal of geological loss) for both the Merensky and UG2 Reefs(Figure 46). The 45.2MOz that is removed are Mineral Resource areas that are not yet included into Mineral Reserves and are defined as future mining areas in most cases, areas that would be regarded as Mineral Inventory or remnant areas that need to be investigated for possible exclusion from Mineral Resources. The pillars and mining loss component is based on an average calculation for designed pillars for all operating shafts. The mining loss is assumed to be an average of approximately 2.7% of the total Mineral Resource, guided by historical mining loss factors used at Rustenburg. Modifying factors as discussed in Section 11, may be either a gain or loss of Mineral Resource and for summary purposes have been included into one item. The MCF at Rustenburg averages 96.1% and makes up the total MCF loss in the reconciliation. Total Mineral Reserves declared are after removal of MCF losses. 11.4.2 Mineral Resources per Mining Area (Inclusive Mineral Reserves) Figure 47 and Figure 48 show the remaining Mineral Resources with respect to infrastructure. All mined out areas are shown in grey. Refer to Table 35 for the Full Mineral Resource(100%) statements per mining area at 31 December 2021.
113 Figure 47: Rustenburg and Kroondal Merensky Reef Accessibility 114 Figure 48: Rustenburg and Kroondal UG2 Reef Accessibility 115 Table 35: Mineral Resource Inclusive of Mineral Reserves per Mining Area as at 31 December 2021 at 100% 4E PGM per Mining Area Measured Indicated Inferred Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Khuseleka 55.0 4.9 8.7 8.8 5.1 1.4 0.0 0.0 0.0 Thembelani 142.6 5.0 22.9 19.3 5.7 3.5 0.3 6.6 0.1 Siphumelele 1 122.0 4.8 18.8 75.9 5.2 12.8 9.6 5.5 1.7 Siphumelele 2 23.4 4.9 3.7 13.2 5.3 2.3 5.0 5.8 0.9 Khomanani 2.2 4.8 0.3 0.0 0.0 0.0 0.0 0.0 0.0 Bathopele 23.0 3.2 2.3 2.5 5.4 0.4 0.0 0.0 0.0 Total Underground 368.1 4.8 56.7 119.7 5.3 20.5 14.9 5.6 2.7 Total: Surface TSF 48.5 1.1 1.7 Grand Total (Underground and Surface) 416.6 4.4 58.4 119.7 5.3 20.5 14.9 5.6 2.7 11.4.3 Changes in the Mineral Resources from Previous Estimates (Inclusive of Mineral Reserves) The 2021 estimation varies from 2020, as shown in the waterfall plot (Figure 47). Mineral Resource depletion due to mining is 1.11Moz and the removal of Hoedspruit 5.79Moz. Changes due to geological losses, new data resulted in an increase of 0.42 Moz. There were no material changes to the estimation parameters between December 2020 and December 2021. The portion attributable to other stakeholders(3rd Party) is 21.2Moz. 116 Figure 49: Rustenburg Operations Underground and Surface Mineral Resource Reconciliation 11.5 QP Statement on the Mineral Resource Estimation and Classification The Mineral Resources declared are estimated based on the geological facies and constrained by appropriate geostatistical techniques, using Ordinary Kriging. The Resource classification follows geostatistical and geological guidelines. The Mineral Resources are declared inside the structural blocks and outside of the mined-out areas. No cut-off grade is applied. The minimum mining unit is the shaft and its accessible volumes. The underlying grade control and reconciliation processes are considered appropriate. It is the QP’s opinion that all issues relating to any technical or economic factors that would be likely to influence the condition of reasonable prospects for economic extraction are addressed or can be resolved with further work.
117 12 Mineral Reserve Estimates 12.1 Mineral Reserve Methodology This section includes discussion and comments on the conversion of Mineral Resources to Mineral Reserves. Specifically, the comment is given on the modifying factors and specific inclusions and exclusions. Table 39 provides details of the LoM plan from 2021 to 2052. 12.2 Mine Planning Process The following planning process applies at the Rustenburg Operations: • Appoint and ensure competence in mine planning responsibilities per section • Consider planning cycle for which plan is to be prepared Obtain an updated geological structural model for design purposes • Obtain/determine future planning levels for the Operation. Identify output levels for the Operation (4E target/tonnage required, development targets) • Break these down per individual operating level • Liaise with all Senior Vice Presidents, Vice Presidents of Operations and business unit management teams and brief anticipated production levels and efficiency rates • Evaluate historical efficiencies against future planned efficiencies and reach an agreement of planning performance levels • Provide base plans for each individual business unit and determine numbers of crews and scheduling systems per business unit • Document and file all tunnel dimensions and advance rates • Review tunnel dimensions with Ventilation, Rock Engineering, Evaluation and Mining Engineering teams • Agree and reach consensus on all stoping layouts, ledging and extraction sequencing/methodologies • Review and sign-off with all appropriate Mining Unit Management Teams • Document the planned parameters in a shaft or unit planning brief • Commence designing of mine plan. Specify capital and preferably separate individual elements for later revision. Ensure naming of working place, etc. • Review development and stoping mine design with appropriate business unit management team members and ancillary support staff, including Mineral Resource Management department competencies • Modify if required, or accept and commence with scheduling based on agreed scheduling parameters per area • Review schedules and outputs in terms of production with Vice Presidents of Operations to ensure appropriate levels of production and volume efficiencies are obtained for that unit • Communicate with all service staff (occupational health (environmental ventilation), rock engineering), and engineering for shaft capacities • Modify and revise as required with appropriate staff • Consolidate all sections to create overall operational performance plan 118 • Run evaluation module/grid and determine 4E output • Provide shaft or unit-based data in terms of volume and grade into an acceptable standard database and reporting format • Review total plan with MRM staff competencies heads • Revise and review again if required • Submit for final review with Senior Vice Presidents and Vice Presidents of Operations to ensure operational targets and performance levels are reached • Submit to the Unit Manager Mine Planning to prepare an appropriate format and for submission to the Financial Department for total mine financial evaluation • Identify all areas where differences in design can or may require additional feasibility study work in the future. These would include declines, new shafts, and alternative layouts. Generate cost models in conjunction with the Project Office • Review mining plan with rock engineers and provide data sets for design modelling. Obtain the support of acceptance of plan as far as rock engineering is concerned. Review mining plan with occupational health (ventilation) engineers and provide data sets for design modelling. Obtain written support of acceptance of plan as far as occupational health is concerned • Review with all mining engineering staff and gain acceptance and commitment to plan. Generate and provide appropriate schedules and plans for all Manager Operations • Consider alternative scenarios relating to rates of advance, alternative layouts, and risk mitigation • Formally document all capital projects and compile consolidated project report for each project • Reconcile the planning Mineral Reserves per shaft with scheduled and designed Mineral Reserves and account for all differences. Modify plan to eliminate all differences. This reconciliation is an MRM competency head process • Prepare Operational/ Strategic Plan presentation to SA Regional EXCO. • Modify and amend where required • Complete final cycle of the planning process and document all parameters. Make a digital backup of the Mineral Reserve model, design model, schedule model, and all associated worksheets/presentation • Roll out and communicate the final plan to all Business Units with prints of appropriate plans and spreadsheets. Confirm and identify all critical development and • Review and modify on a monthly basis actual achievement vs planned volumes. 12.3 Historical Mining Parameters The planning parameters are primarily based on historical achievements. Table 15 provides the historical mining performance for Rustenburg Operations, where mining expenditures are stated in nominal terms. Historical mining statistics for Rustenburg Operations from C2016 to C2020 and historical averages, are provided in Table 36: 119 Table 36: Historical Mining Statistics by Section Shaft Units C2016 C2017 C2018 C2019 C2020 C2021 Thembelani 1# Primary Reef Development (m) 2.059 2.827 2.782 2.351 2.069 3.162 Primary Waste Development (m) 5.075 3.587 4.584 3.884 1.794 3.953 Stoping Square metres (m2) 329.583 360.525 362.723 267.963 193.048 240.048 Tonnes Milled (kt) 1.522 1.552 1.57 1.29 936 1.178 4E ounces M&C (oz) 164.76 177.3 182.861 143.175 108.181 135.132 Siphumelele 1# Primary Reef Development (m) 1.143 1.425 2.092 2.136 1.437 1.589 Primary Waste Development (m) 4.219 2.83 2.406 2.034 1.201 1.461 Stoping Square metres (m2) 185.797 185.89 188.773 160.089 105.307 138.414 Tonnes Milled (kt) 761 764 788 724 474 597 4E ounces M&C (oz) 112.15 114.24 118.929 91.622 66.906 81.539 Khuseleka 1# Primary Reef Development (m) 1.124 2.151 3.197 3.947 2.951 4.181 Primary Waste Development (m) 3.77 5.912 6.825 7.584 5.665 7.032 Stoping Square metres (m2) 342.48 363.651 327.93 356.56 257.787 313.918 Tonnes Milled (kt) 1.63 1.652 4.525 1.671 1.232 1.542 4E ounces M&C (oz) 169.3 175.39 158.776 171.42 133.995 166.309 Bathopele Primary Reef Development (m) 1.976 1.567 2.113 1.491 1.288 1.55 Primary Waste Development (m) - - - - - - Stoping Square metres (m2) 448.403 460.562 448.509 473.392 388.839 430.92 Tonnes Milled (kt) 3.158 3.125 3.22 3.311 2.764 3.024 4E ounces M&C (oz) 243.61 251.14 240.234 241.971 194.963 218.072 Total Underground SRPM Operations Primary Reef Development (m) 6.302 7.97 10.184 9.925 7.745 10.482 Primary Waste Development (m) 13.064 12.329 13.815 13.501 8.66 1.245 Stoping Square metres (m2) 1,306,263 1,370,628 1,327,935 1,258,004 944.981 1,123,300 Tonnes Milled (kt) 7.071 7.093 10.103 6.996 5.405 6.341 4E ounces M&C (oz) 689.82 718.07 700.8 648.188 504.044 601.052 120 12.4 Shaft and Mine Paylimits 12.4.1 Paylimits • No pay limits are applied to the Mineral Resources and Mineral Reserves that are quoted due to there being no mining selectivity based on the grades being applied at any of the Shafts at the Rustenburg Operations. • With the UG2 and Merensky Reefs having low grade variability, all available blocks are reported to be mined, essentially a blanket mining approach. • Margin analysis is carried out based on cost and revenue variability. • Refer to Section 0 for more information on paylimits and cut-off grades. 12.4.2 Modifying Factors and LoM plan The QP has used a Mine Call Factor (MCF) of 98% on Bathopele Mine, and96% on the conventional operations of Thembelani, Khuseleka and Siphumelele. Recent history is used to determine an appropriate MCF for the LoM Plan. Table 37 and Table 38 provide details of the projected modifying factors. Table 39 and Table 40 presents the LoM plan. Dilution is variable across the property and is included in the stope tramming width. A separate dilution factor is not used as a modifying factor. Recent history is used to determine an appropriate MCF for the LoM Plan. The Mineral Reserve classification of Proved and Probable was largely a function of the Mineral Resource classification with due consideration of the minimum criteria for the “Modifying Factors” as considered: • Mining • Metallurgical • Processing • Infrastructural • Economic • Marketing • Legal and • Environmental, social and governmental factors.
121 Table 37: Mineral Reserve Mining Modifying Factors Conventional Shafts, (Thembelani, Siphumelele, Khuseleka) RPM Unit C2019 C2020 C2021 C2022 Survey Called For Grade Merensky Reef g/t 4.9 5.1 5.2 4.7 UG2 Reef g/t 3.9 3.9 3.9 3.3 Total g/t 4.3 4.4 4.6 3.6 Stope Tramming Width Merensky Reef (cm) 123 126 125 124 UG2 Reef (cm) 122 122 123 165 Total (cm) 122 123 124 152 Waste Mining Percentage Merensky Reef (%) 5 5 5 4 UG2 Reef (%) 2 2 2 4 Total (%) 3 3 4 4 Reef Development to Mill Merensky Reef (%) 3 3 3 5 UG2 Reef (%) 3 3 3 3 Total (%) 3 3 3 3 Mine Call Factor Merensky Reef (%) 92 97 94 95 UG2 Reef (%) 95 96 96 97 Total (%) 97 99 95 96 Plant Recovery Factor Merensky Reef (%) 84 88 84 85 UG2 Reef (%) 82 85 85 85 Total (%) 83 86 84 85 122 Table 38: Mineral Reserve Mining Modifying Factors Mechanized Shafts (Bathopele) RPM Unit C2019 C2020 C2021 C2022 Survey Called For Grade UG2 Reef g/t 2.9 2.8 2.8 2.8 Total g/t 2.9 2.8 Stope Tramming Width UG2 Reef (cm) 208 207 211 208 Total (cm) 208 207 Waste Mining Percentage UG2 Reef (%) 6 6 6 6 Total (%) 6 6 Scalping UG2 Reef (%) 5 5 4 4 Total (%) Reef Development to Mill UG2 Reef (%) 2 3 3 3 Total (%) 2 3 Mine Call Factor UG2 Reef (%) 97 100 98 98 Total (%) 97 100 Plant Recovery Factor UG2 Reef (%) 82 85 79 86 Total (%) 82 85 123 Table 39: LoM Plans – Current Operations 2022-2031 Rustenburg Operations Units LoM C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 C2030 C2031 1 2 3 4 5 6 7 8 9 10 Underground Primary On-Reef Development (m) 114,610 11,541 10,328 8,800 7,533 5,421 5,298 5,353 5,059 5,733 4,977 Primary Off-Reef Development (m) 161,901 13,293 11,854 11,068 10,411 10,558 9,699 9,896 9,415 9,059 9,025 Mill Tonnes** (kt) 98,529 7,166 7,046 7,097 6,865 6,008 5,506 4,471 3,956 3,253 3,352 4E Ounces in Mill Feed (kOzt) 12,153 795 793 804 793 725 682 537 488 416 429 Recovery (%) 84.8 85.5 85.5 85.4 85.3 85.2 85.1 84.7 84.5 84.3 84.3 Yield (g/t) 3.25 2.95 2.99 3.01 3.07 3.20 3.28 3.16 3.24 3.35 3.35 4EProduced (kOzt) 10,309 679 678 686 677 618 580 455 412 351 361 Surface Mill Tonnes (kt) 48,331 9,869 9,960 9,960 9,960 8,582 4E Ounces in Mill Feed (kOzt) 1,572 318 325 325 325 279 Recovery (%) 27.2 27.2 27.2 27.2 27.2 27.1 Yield (g/t) 0.28 0.27 0.28 0.28 0.28 0.27 4E Produced (kOzt) 428 87 89 89 89 76 Total Mine Mill Tonnes (kt) 146,860 17,035 17,006 17,057 16,825 14,590 5,506 4,471 3,956 3,253 3,352 4E Ounces in Mill Feed (kOzt) 13,726 1,112 1,118 1,129 1,118 1,005 682 537 488 416 429 Recovery (%) 78.2 68.8 68.5 68.7 68.4 69.0 85.1 84.7 84.5 84.3 84.3 Yield (g/t) 2.27 1.40 1.40 1.41 1.41 1.48 3.28 3.16 3.24 3.35 3.35 4E Produced (kOzt) 10,736 766 766 775 765 694 580 455 412 351 361 **Excludes tonnage from Rustenburg Mine accessed through the Kroondal infrastructure see Section 21 for more information. 124 Table 40: LoM Plans – Current Operations 2032-2051 Rustenburg Operations Units 2032- 2036 2037- 2041 2042- 2046 2047- 2051 11-14 15-19 20-24 25-29 Underground Primary On-Reef Development (m) 22,799 12,243 5,798 3,730 Primary Off-Reef Development (m) 31,236 13,556 7,416 5,417 Mill Tonnes (kt) 16,490 15,939 7,749 3,631 4E Ounces in Mill Feed (kOzt) 2,133 2,055 1,010 496 Recovery (%) 84.3 84.3 85.0 85.5 Yield (g/t) 3.39 3.38 3.44 3.63 4E Produced (kOz) 1,797 1,733 858 424 Surface Mill Tonnes (kt) 4E Ounces in Mill Feed (kOzt) Recovery (%) Yield (g/t) 4E Produced (kOzt) Total Mine Mill Tonnes (kt) 16,490 15,939 7,749 3,631 4E Ounces in Mill Feed (kOz) 2,133 2,055 1,010 496 Recovery (%) 84.3 84.3 85.0 85.5 Yield (g/t) 3.39 3.38 3.44 3.63 4E Produced (kOzt) 1,797 1,733 858 424
125 12.5 LoM Projects There are no LOM projects. 12.6 Specific Inclusions and Exclusions The decision on whether to include or exclude potential mining areas is based on a detailed review, which includes: • Health and safety considerations • Economic viability • Technical justification • Ability to mine the area and • Infrastructure availability constraints. All areas included in the LoM plan are mined from current infrastructure. 12.6.1 Specific Exclusions • Areas with adverse ground conditions after evaluation by Rock Engineering and other Service Departments and mining and • Off Reef areas where there is no other need such as Ventilation or infrastructure. 12.6.2 Specific Inclusion • Areas required for Ventilation or specific infrastructure development. 12.7 Mineral Reserve Estimation The Mineral Reserve estimation process at the Rustenburg Operations is based on the development of an appropriately detailed and engineered LoM plan, which accounts for all necessary access development and stope designs. The terms and definitions are in accordance with the classification criteria of Subpart 1300 of Regulation S-K. Further, in presenting the Mineral Reserve statements and associated sensitivities, the following applies: • All Mineral Reserves are quoted as of 31 December 2021 • All Mineral Reserves are quoted at prices listed in Table 60 to Table 62 in Section 16.4.All Mineral Reserves are quoted in terms of the expected RoM grades and tonnage as delivered to the metallurgical processing facilities, and therefore the quantities reported account for dilution • Mineral Reserve statements include only Measured and Indicated Mineral Resources modified to produce Mineral Reserves and contained in the LoM plan • All Mineral Reserves are evaluated to at least a Pre-Feasibility level within cost limits as given in Section 18 and • All references to Mineral Resources and Mineral Reserves are stated in accordance with Subpart 1300 of Regulation S-K (paragraph II.E.3). 126 The Mineral Reserves are derived following the production of a LoM plan by incorporating Modifying Factors into the Mineral Resource model. All design and scheduling work is undertaken within Cadsmine, a mine planning and scheduling program. The planning process incorporates appropriate Modifying Factors based on the reconciliation exercises described and technical economic investigations. The mill tonnes are quoted as mill delivered metric tonnes and RoM, grades, inclusive of all mining dilutions. Mining dilution includes other material, which is waste that is broken on the mining horizon, other than on the stope face and includes unknown geological losses. Mineral Reserves classification is given in Figure 50 and Figure 51. For the boundaries between Kroondal and Rustenburg refer to Figure 3. . 127 Figure 50: Mineral Reserves Classification as at 31 December 2021- Merensky Reef (includes adjacent mine of the registrant) 128 Figure 51: Mineral Reserves Classification as at 31 December 2021- UG2 Reef (includes adjacent mine of the registrant)
129 12.8 Surface Sources Surface sources refer to low grade waste and processed materials, from a Tailings Storage Facility (TSF) at the Rustenburg Operations. 12.9 Mineral Reserves Statement The Mineral Reserve is declared separately for underground and surface sources. The Prill Split for the Mineral Reserves is given in Table 41. the Mineral Reserves are given in Table 42 and Table 43. The Mineral Reserves per shaft are given in Table 44 and Table 45. Figure 52 shows the main changes year on year due to various factors. Notes on the Mineral Reserves • Mineral Reserve was reported in accordance with the classification criteria of Regulation S-K 1300. • Mineral Reserve was estimated on all available blocks accessible from the infrastructure and no cut-off grade was applied. • Attributable Mineral Reserve is 100.00%. • Where grade is less than 0.05g/t the value will reflect as zero(0) in the table • Where grade is less than 0.05Moz the value will reflect as zero(0) • Mineral Reserves are estimated using the prices in Section 16.4. • Risks are discussed in Section 21.1.2. Table 41: Prill Split and Recovery for Mineral Reserves Prill Split Pt Pd Rh Au Recovery % % % % % Merensky 63.67 27.38 3.99 4.97 84% UG2 52.29 33.00 13.82 0.89 85% Combined 53.96 32.37 12.23 1.44 85% TSF 62.5 25 6.25 6.25 27.2% 130 Table 42: Mineral Reserve as at 31 December 2021 at 100% Classification - 4E PGM Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Dec-21 Dec-20 Dec-21 Dec-20 Dec-21 Dec-20 Underground Proved 112.7 106.1 3.5 3.7 12.9 12.7 Probable 8.0 4.5 4.2 4.4 1.1 0.6 Total Underground 120.8 110.5 3.6 3.7 13.9 13.3 Surface Opencast Proved Open-pit 0.0 0.0 0.0 0.0 0.0 0.0 Probable Open-pit 48.3 60.5 1.0 1.1 1.6 2.1 Total Surface 48.3 60.5 1.0 1.1 1.6 2.1 Total Proved 112.7 106.1 3.5 3.7 12.9 12.7 Total Probable 56.3 65.0 1.5 1.3 2.7 2.7 Total Reserve 169.1 171.0 2.9 2.8 15.5 15.4 Table 43: Attributable Mineral Reserve as at 31 December 2020 Classification - 4E PGM Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Dec-21 Dec-20 Dec-21 Dec-20 Dec-21 Dec-20 Underground Proved 83.4 106.1 3.5 3.7 9.5 12.7 Probable 6.0 4.5 4.2 4.4 0.8 0.6 Total Underground 89.4 110.5 3.6 3.7 10.3 13.3 Surface Opencast Proved Open-pit Probable Open-pit 35.8 60.5 1.0 1.1 1.2 2.1 Total Surface 35.8 60.5 1.0 1.1 1.2 2.1 Total Proved 83.4 106.1 3.5 3.7 9.5 12.7 Total Probable 41.8 64.9 1.5 1.3 2.0 2.7 Total Reserve 125.1 171.0 2.9 2.8 11.5 15.4 131 Table 44: Mineral Reserve per Mining Area as at 31 December 2020 at 100% 4E PGM per Mining Area Proved Probable Dec-20 Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Thembelani 32.1 4.0 4.1 6.3 4.4 0.9 38.5 4.1 5.0 Khuseleka 38.0 3.9 4.8 0.2 4.4 0.0 38.3 4.0 4.9 Siphumelele 24.9 2.8 2.3 1.5 3.1 0.1 26.3 2.9 2.4 Bathopele 17.7 2.8 1.6 0.0 0.0 0.0 17.7 2.8 1.6 Total Underground 112.7 3.5 12.9 8.0 4.2 1.1 120.8 3.6 13.9 Total Surface TSF 0.0 0.0 0.0 48.3 1.0 1.6 48.3 1.0 1.6 Grand Total (Underground and Surface) 112.7 3.5 12.9 56.4 1.5 2.6 169.1 2.9 15.5 Table 45: Attributable Mineral Reserve per Mining Area as at 31 December 2020 4E PGM per Mining Area Proved Probable Dec-20 Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Thembelani 23.8 4.0 3.1 4.7 4.4 0.7 28.5 4.1 3.7 Khuseleka 28.1 3.9 3.6 0.2 4.4 0.0 28.3 4.0 3.6 Siphumelele 18.4 2.8 1.7 1.1 3.1 0.1 19.5 2.9 1.8 Bathopele 13.1 2.8 1.2 0.0 0.0 0.0 13.1 2.8 1.2 Total Underground 83.4 3.5 9.5 6.0 4.2 0.8 89.4 3.6 10.3 Total Surface TSF 0.0 0.0 0.0 35.8 1.0 1.2 35.8 1.0 1.2 Grand Total (Underground and Surface) 83.4 3.5 9.5 41.7 1.5 2.0 125.1 2.9 11.5 132 Figure 52: The Rustenburg Operations Mineral Reserve Reconciliation at 31 December 2021 12.10 Mineral Reserve Sensitivity • No cut-off grade is applied to the Mineral Resources and Mineral Reserves that are quoted due to there being no mining selectivity based on the grade variability being mined at any of the Shafts at the Kroondal Operations. • The Merensky and UG2 Reefs have low grade variability, all available blocks are reported to be mined, essentially a blanket mining approach. • Long term major changes in prices or input costs can affect shaft sustainability or new project introduction (Section 19). 12.11 QP Statement on the Mineral Reserve Estimation The Mineral Reserves declared are estimated from detailed LoM plans developed per shaft and are based on the Mineral Resource Estimates as at 31 December 2021 together with a set of modifying factors based on recent historical achievements. The assumptions applied in determining the modifying factors are reasonable and appropriate and the LoM plans were developed with a bottom-up approach that is sufficient in detail to ensure achievability. All the inputs used in the estimation of the Mineral Reserves have been thoroughly reviewed and can be considered technically robust. The QP considers the modifying factors to be based on a robust historical database of several years history and 15.4 15.515.4 14.40.0 0.1 0.0 1.4 (1.1) (0.2) (0.2) (4.0) 11.5 0 2 4 6 8 10 12 14 16 18 A tt rib u ta b le O D e c 2 0 3 rd P a rt y O 1 0 0 % O D e c 2 0 D e p le ti o n s 2 1 R e se rv e s P o st D e p le ti o n s E c o n o m ic V a lu a ti o n E v a lu a ti o n G e o lo g ic a l C h a n g e s B o u n d a ry C h a n g e s Te c h n ic a l F a c to rs 1 0 0 % O D e c 2 1 Le g a l E n ti ty O A tt rib u ta b le O D e c 2 1 o E P iner Reser e re on i i tion
133 no material changes are anticipated that will have a significant bearing on the estimation process. Risks are further discussed in Section 21. 13 Mining Methods 13.1 Introduction This section includes discussion and comments on the mining engineering related aspects of the LoM plan associated with Rustenburg Operations. Specifically, the comment is given on the mine planning process, mining methods, geotechnics, geohydrology and mine ventilation. Mine layouts are shown in Figure 53 and Figure 54. Figure 53: Typical Merensky Reef Mine Layout 134 Figure 54: Typical UG2 Reef Mine Layout 13.2 Shaft Infrastructure, Hoisting and Mining Methods 13.2.1 Shaft Infrastructure The schematic view section of the Vertical Shaft is shown in Figure 55. Figure 56 shows the schematic representation of the Decline Shaft. Figure 55: Cross sectional Schematic of a Vertical Shaft Figure 56: Cross sectional Schematic of a Decline shaft 136 13.2.2 Hoisting The hoisting capacity of the winders is given in Table 46. Unconstrained capacity is the maximum capacity of the winders. The constrained capacity is the reduced capacity due to load shifting. Load shifting reduces the available capacity by reducing the operating hours. This is done to reduce power costs by not operating during peak power grid hours. Table 46: Hoisting Capacities of the Rustenburg Shafts Shaft Operating Capacity(tpm) 5-year Planned production(tpm) Siphumelele 195,000 65,000 Khuseleka 225,000 140,000 Thembelani 220,000 140,000 Bathopele 280,000 260,000 13.2.3 Mining Methods The mining methods employed at the Rustenburg Operations vary between shafts and can be subdivided as follows: Conventional Scattered Breast Mining: Khuseleka, Thembelani and Siphumelele The stoping method on the Merensky Reef and the UG2 Reef at Khuseleka, Thembelani and Siphumelele is conventional scattered breast mining. This method incorporates in-stope crush pillars and regional pillars to maintain the stability of the workings. It allows for greater flexibility in the mining of moderately dipping narrow tabular reefs and the negotiation of geological structures. It involves a development grid followed by breast mining; whereby regional dip pillars are left permanently unmined. Mechanised Bord and Pillar: Bathopele Bathopele is a mechanised operation mining the UG2 Reef. Current operations are at depths between 40m and 480m below surface with a planned depth of 515 m. The average dip of the reef is 9°, and as a result, bord and pillar is the mining method used. Regularly spaced pillars support the middling to the surface and are designed not to yield or fail. The protection of surface structures such as buildings, roads and railway lines is achieved by ensuring that the pillars are capable of supporting the overburden. Where the normal pillar configuration does not provide the necessary support, additional pillars are designed. All remnant area mining undergoes a continual risk assessment process and those areas that pose a risk are excluded from the Mineral Reserves. Ongoing evaluation studies are routinely done to define optimal extraction scenarios that are cost- effective and meet best operational practices. No backfilling is used on underground operations. There are no stripping requirements for open-pit operations on the property.
137 13.3 Geotechnical Analysis The Technical Report Summary has been compiled with generally appropriate input from qualified Rock Engineers. Strategic planning and major design issues were completed with the relevant input from the responsible Rock Engineers. The primary aspects making up the geotechnical analysis are: • Geotechnical conditions, • Stress and seismological setting, and • Regional and local support. 13.3.1 Geotechnical Conditions Major structures/fault zones intersect the orebody at most operations. Structures of note are; • Hex River fault – this is associated with weathering and poor ground conditions and affects Bathopele, Thembelani and Khuseleka. Appropriate mitigation strategies are in place, and these include bracket pillars, secondary and tertiary support as well as limiting mining to necessary development only. Mining is planned at lower rates in the vicinity of the fault. • F1 fault – this affects the Thembelani and Siphumelele shaft. Similar mitigations strategies as the Hex River fault are in place. • Siphumelele/Turfontein Shear zone – affects Bambanani Shaft. Ground conditions characterised by blocky rockmass. Mitigation strategies include secondary support and reduced panel spans. 13.3.2 Stress and seismological setting Stress and seismicity risk is higher at the conventional operations than for the mechanised operations, with Siphumelele being the highest seismic risk operation. Seismic sources are fault slip and pillar failure. Seismic monitoring systems are in place at all these operations. At Bathopele, stress and seismicity risk is low due to the depth of operations. However, this does not preclude the fact that incorrect adherence to mining sequence may result in increased stress conditions and rockbursting/strainbursting can occur. 13.3.3 Regional and Local Support In the bord and pillar operations, regularly spaced intact pillars are left as part of the layout. These pillars support the middling to the surface and should not be allowed to yield or fail. The protection of surface structures, i.e. buildings, roads, railway lines, etc., is achieved by ensuring that the pillars in the stoping environment, are capable of supporting the overburden. These pillars have a Safety Factor of more than two. In conventional operations, regional dip pillars ranging from 10m to 20m in width, depending on the depth below the surface and the back length dip span, are placed midway between planned raises. Raise lines are planned to be spaced on average 200 to 230m apart on strike, resulting in dip pillars to be spaced to suite, centre to centre. Geological losses (potholes, dykes & faults) can be incorporated as regional support. 138 Crush pillars measuring 3.0m x 3.0m are cut for all UG2 Reef stoping (32m panel spans) and a crush pillar size of 4.0m x 2.5m are cut for all Merensky Reef stoping (35m panel spans) up to a mining depth of 1400m below surface, with ventilation holings of 3m wide between these crush pillars (every 3-4m depending on reef type) At Bathopele, at the bord and pillar operations, regularly spaced intact pillars are left as part of the layout. These pillars support the middling to the surface and should not be allowed to yield or fail. The protection of surface structures, i.e. buildings, roads, railway lines, etc., is achieved by ensuring that the pillars, in the stoping environment are capable of supporting the overburden. These pillars have a Factor of Safety (FoS) >2,0. This empirically derived FoS is a requirement of the MCOP. 13.4 Mine Ventilation All projects and new infrastructure designs incorporate detailed ventilation modelling and recommendations as part of normal feasibility planning processes under the auspices of Environmental Engineering. All underground mines are demarcated into mining ventilation districts. The ventilation design for conventional mining is based on a velocity of 0.4 m/s with 0.25 m/s as a minimum legal requirement. For trackless mining ventilation design is based on 1 m/s. 13.5 Refrigeration and Cooling Refrigeration and Cooling become necessary at a mining depth deeper that approximately 1100m below surface (thermal threshold). This is needed to ensure compliance to legal requirements and to ensure safe and environmentally friendly underground mining conditions. Siphumelele is the only mine in the Rustenburg complex which is deeper than this threshold and does have fully functional refrigeration and cooling plant installed and in operation. 13.6 Flammable Gas Management Sporadic flammable gas intersections are encountered on the shafts. These intersections are well controlled by the Flammable Gas Code of Practice and procedure. Continuous gas measuring instruments and a telemetry system are used to detect Carbon Monoxide in the operations. 13.7 Mine Equipment The major mine equipment installed and utilised at the Rustenburg Conventional Operations is shown in (Table 47 and Table 48. Table 47: Major Mine Equipment Major Equipment Quantity Locos 194 Chairlifts 6 Winches 809 Rock Winder 2 Emergency Generators 10 139 Trackless Mobile Machinery 12 Decline Winders 3 Loaders 64 Main Pumps 8 Man Winders 3 Surface Conveyors 16 Surface Vent Fans 9 Transformers 39 U/G Conveyors 2 Surface & U/G Sub Stations 22 Service Winder 1 Mini Subs 72 Shaft Conveyors 5 Koepe Winder 1 Headgear Lift 1 Decline Conveyors 5 Conveyors 14 Vent Fans 6 Table 48: Rail Bound Equipment Summary – 2021 Asset Type Avg 12 months Loco's 163 Loaders 87 Explosive Cars 253 Material Cars 920 Hoppers 1108 Drill Rigs 28 Bogeys 65 Man carriages(8 mths) 16 13.8 Personnel Requirements Personnel requirements and related information are available in Sections 4.5 and 17.2. 13.9 Final Layout Map Refer to Section 12.7 and Figure 50 and Figure 51 for the distribution of Mineral Reserves and mined out areas. 140 14 Processing and Recovery This section covers the metallurgical and mineral processing aspects associated with the Rustenburg Operations. Specifically, on the process metallurgy and process engineering aspects relating to plant capacity, metallurgical performance and metal accounting practices as incorporated in the LoM plan. 14.1 Processing Facilities Five process plants are located at the Rustenburg Operations, namely: • Waterval UG2 Concentrator, treating only UG2 ore (has an 85.3% 4E recovery factor). • Waterval Retrofit Concentrator, treating a blend of Merensky and UG2 ores in Module one. This plant has an 84.1% recovery factor. Since 2016 Retrofit has treated remined tailings from the Waterval East and West TSF in Module two. It should be noted that the final tails of the fresh reef ore and the tailings material only combine in the final tails section of both Module one and two. Plant is running at reduced capacity due to lower tonnage output from Shafts. • Chrome Retreatment Plant (CRP). The CRP treats the Primary Rougher middlings of UG2 to recover a saleable chromite concentrate. The plant has a 12.0% recovery factor. • Western Limb Tailings Retreatment plant (WLTR plant), treating tailings from the Klipfontein TSF has a 28.0% recovery factor. • Platinum Mile Concentrator (PMC) treats current arising from Waterval UG2 and Waterval Retrofit Concentrators as well as tailings from the Waterval West TSF and has a 16.0% recovery factor. In 2019, PMC started to treat tailings from the Waterval East and West TSF with a recovery factor of 24.0%. The mineral processing plant parameters are shown in Table 49 Capacity based on current retention times and historical achievement Table 49: Mineral Processing Plant Parameters. Plant Design Capacity (ktpm) Operational Capacity* (ktpm) Waterval UG2 concentrator 450 475 Waterval retrofit concentrator 620 130 CRP 440 405 WLTR 450 400 Platinum Mile Retrofit 800 940
141 The following major process equipment is installed and utilised at the Rustenburg Concentrators Table 50. Table 50: Process Equipment Summary Major Equipment Quantity Ball mills 4 Regrind mills 4 Flotation cells 87 Thickeners 6 Jaw crusher 3 14.1.1 Waterval UG2 Concentrator The Waterval UG2 concentrator is a 450 ktpm nameplate capacity concentrator. The plant has a two- stage milling and flotation (MF2) configuration circuit with two cleaning stages and a final column flotation circuit to reduce chromite in the final concentrate Figure 57). The process plant comprises the following main circuits: • Ore receiving, • Crushing and screening, • Milling, • Flotation, • Concentrate and • Tailings. The Concentrator receives UG2 RoM ore from both the Rustenburg Conventional Shafts and Bathopele ore receiving circuits. Ore is fed to primary crushing from the Rustenburg Operations from either a 2,000t bin or from a 70,000t stockpile. Bathopele ore is fed to primary crushing from a 6500t silo. Crushed ore from both Rustenburg vertical shafts and Bathopele are combined and screened to either the fine ore mill feed silo with a capacity of 13,500t, or a coarse ore mill feed silo with a capacity of 6,500t. The milling plants consist of primary, secondary and mainstream inert grinding (MIG) milling circuits. As part of a business decision the MIG circuits are not being used anymore. The crushed product is milled and floated in an MF2 configured circuit. A single primary mill is operated in the closed circuit while both the cyclone overflow and cyclone underflow reports to a classifying screen. The screen underflow reports to the Primary flotation circuit whilst screen overflow is returned to the Primary mill. In the Primary flotation circuit, the material reports to the Rougher cells. The floated material reports as a primary concentrate which is fed for further upgrading in cleaning and re-cleaning stages. The rougher tail reports to the CRP plant for chromite removal. After chromite removal, the tails from the CRP, plant is pumped to a single Secondary mill for further finer grinding and this product reports to the Secondary rougher cells. The low-grade tails from the Secondary rougher circuit are pumped to the Final Tailings Thickener prior to disposal to the Tailings Storage Facility (TSF). Final concentrate from the Primary and Secondary recleaner circuits report to the Final Concentrate transfer tank. The Final Flotation Concentrate stream from the flotation circuit is thickened and filtered at the Waterval Retrofit Concentrator. The responsibility for concentrate extraction and filtration currently resides with the Anglo American - Waterval Smelter. The recent history and budget operational parameters for the UG2 concentrator are presented in Table 51, Figure 58 and Figure 59. The C2018, C2019, 2020 and C2021 data presented reflect the actual annual performance whilst the C2022 to C2040 data represents current budget targets. The current operational methods and capacities are adequate. Metallurgical efficiencies projected have also been sustainably obtained historically and are thus reasonable budget targets. Figure 57: The Schematic Process Flow Diagram for Waterval UG2 Concentrator Table 51: Waterval UG2 Concentrator Production Forecast and Operational Data Figure 58: Waterval UG2 Concentrator Throughput Forecast Parameter Actual Budget C2018 C2019 C2020 C2021 C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 Total Feed (kt) 4,861 5,372 4,608 4,865 5,616 5,517 5,619 5,563 5,024 4,817 4,372 3,887 Head Grade (g/t) 3.16 3.25 3.21 3.14 3.19 3.24 3.30 3.39 3.58 3.69 3.72 3.84 Concentrate Produced (kt) 84 62 6 74 84 83 84 83 75 72 65 58 4E Recovery (%) 83.9% 82.0% 84.7% 87.0% 85.3% 85.4% 85.3% 85.0% 84.9% 84.8% 84.6% 84.5% 4E Metal Produced (koz) 414 460 403 427 491 491 508 516 491 484 443 406 Parameter Budget C2030 C2031 C2032 C2033 C2034 C2035 C2036 C2037 C2038 C2039 C2040 Total Feed (kt) 3,462 3,411 3,268 3,288 3,316 3,325 3,382 3,353 3,196 3,063 2,882 Head Grade (g/t) 3.97 3.98 3.98 3.97 4.00 4.04 4.04 4.05 4.04 4.01 3.97 Concentrate Produced (kt) 52 51 49 49 50 50 51 50 48 46 43 4E Recovery (%) 84.4% 84.3% 84.3% 84.2% 84.2% 84.3% 84.3% 84.2% 84.3% 84.2% 84.2% 4E Metal Produced (koz) 373 368 353 353 359 364 370 367 349 332 310
145 Figure 59: Waterval UG2 Concentrator Production and Recovery Forecast 14.1.2 Waterval Retrofit Concentrator The Waterval Retrofit concentrator consists of two sets of 310 ktpm mainstream modules operating in parallel to give a combined plant nameplate capacity of 620 ktpm. Note! The Primary mill, Rougher and Scavenger floatation circuit of Module 2 are not in operation due to limited ore reserves. The Regrind mills of Module 2 is utilized for processing of E-Feed material. It should also be noted that the average throughput in Module 1 is also limited (avg. 90 to 130kt per month) due to limited ore reserves. The Waterval Retrofit concentrator was retrofitted from the Waterval Merensky Concentrator, the oldest of the Waterval Concentrators. The plant consists of two MF2 modules in parallel with shared cleaner flotation banks. The process plant comprises the following main circuits: • Ore receiving • Crushing and screening • Milling • Flotation • Concentrate • Tailings. 146 UG2 and Merensky RoM ore is received into a 2,000t bin and fed to the primary crushing section. The crushed ore is fed to four mill feed silos. Each module has two dedicated feed silos. The milling plant for each module has a dedicated Primary and Secondary mill circuit. Note! As part of a business decision, MIG mills are not in use. Tailings material can also be received from the Tailings storage facilities (TSF) and treated in each of the modules. The crushed product is milled and floated in an MF2 configured circuit. Two primary mills (one per module) are operated in a closed circuit. Woodchip removal cyclones are installed ahead of the classification screens. Figure 60 shows the process flow. The cyclone overflow material, after woodchip removal, and cyclone underflow reports to a classifying screen. Screen underflow reports to the primary flotation circuit whilst screen overflow is returned to the Primary mill. In the Primary flotation circuit, the floated material reports as a primary concentrate and is fed for further upgrading in cleaning and re-cleaning stages. A number of processing options are available for the concentrate produced. The tails from the Primary rougher cells are pumped to the Secondary milling circuit, each consisting of two secondary and two MIG mills (MIG’s not in use) for further finer grinding, with this product reporting to the Primary scavenger cells and the subsequent product going to the Secondary scavenger cells. The low-grade tails from the secondary scavenger circuit are pumped to the Final tails thickener and water reticulation area (Area 250) where the material are cycloned and thickened before being transferred to the TSF. Final flotation concentrates from the {Primary, secondary and tertiary recleaner circuits is fed to two final concentrate thickeners. The responsibility for concentrate extraction and filtration currently resides with the Waterval Smelter. The concentrator shares multiple services including potable water, process water, fire water, tailings disposal, electrical and motor control buckets with the Waterval Smelter which is owned by Anglo American Platinum. All of these services need to be separated or a service agreement reached before the plants can be operated as standalone units. Agreements have been established for shared services. Process, Gland seal (GSW) as well as the Fire hydrant water systems have been successfully separated. Tailings disposal is still integrated and will continue until further notice. The recent history and budget operational parameters for the UG2 concentrator are presented in Table 52, Figure 61 and Figure 62. The C2018, C2019, 2020 and C2021 data presented reflect the actual annual performance whilst the C2022 to C2040 data represents current budget targets. The current operational methods and capacities are adequate. Metallurgical efficiencies projected have also been sustainably obtained historically and are thus reasonable budget targets. Figure 60: The Schematic Process Flow Diagram for Waterval Retrofit Concentrator Table 52: Waterval Retrofit Concentrator Production Forecast and Operational Data Figure 61: Watervaal Retrofit Concentrator Throughput Forecast Parameter Actual Budget C2018 C2019 C2020 C2021 C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 Total Feed (kt) 3,844 1,624 797 1,476 1,548 1,526 1,416 1,172 894 637 440 307 Head Grade (g/t) 3.12 4.25 4.46 4.33 4.40 4.44 4.36 4.54 4.74 5.05 5.00 4.76 Concentrate Produced (kt) 85 49 23 42 46 46 42 35 27 19 13 9 4E Recovery (%) 79% 84% 88% 86% 86% 86% 86% 86% 86% 87% 87% 87% 4E Metal Produced (koz) 306 187 100 177 188 187 170 147 118 90 62 41 Parameter Budget C2030 C2031 C2032 C2033 Total Feed (kt) 154 104 93 92 Head Grade (g/t) 4.91 5.08 4.95 4.73 Concentrate Produced (kt) 5 3 3 3 4E Recovery (%) 87% 87% 87% 87% 4E Metal Produced (koz) 21 15 13 12
149 Figure 62: Watervaal Retrofit Concentrator Production and Recovery Forecast 14.1.3 Western Limb Tailings Retreatment Plant (WLTR Plant) The WLTR plant has 450 ktpm original name plate capacity (Figure 63). Tailings are re-mined from the Klipfontein TSF; the mined tailings then report to an adjacent re-mining plant and is then pumped to WLTR plant for reprocessing. The process plant is divided into the following main circuits, namely: • Feed receiving • Milling • Flotation • Concentrate • Final tailings Feed from the Klipfontein re-mining plant is fed to the WLTR plant thickener and pumped to the cyclone cluster for desliming. Milled product is combined with deslimed cyclone overflow and fed to a cyclone cluster for classification. Cyclone underflow is returned to the mill with the overflow fed to the primary flotation circuit. In primary flotation, the floated material reports as primary high-grade concentrate and is fed to flotation cells for further upgrading. An intermediate grade concentrate is upgraded in further cleaning stages. The tails from the primary rougher cells are pumped to the final tailings thickener before being pumped to the TSF. 150 Concentrate from the primary flotation circuit together with tailings from the cleaner flotation cells are further processed in the ultra-fine grinding (UFG) milling circuit. Flotation concentrate from the various circuits is fed to the final concentrate thickener prior to being filtered and trucked to the Waterval Smelter. The recent history and budget operational parameters for the UG2 concentrator are presented in Table 53, Figure 61 and Figure 62. The C2018, C2019, 2020 and C2021 data presented reflect the actual annual performance whilst the C2022 to C2040 data represents current budget targets. The current operational methods and capacities are adequate. Metallurgical efficiencies projected have also been sustainably obtained historically and are thus reasonable budget targets. Figure 63: The Schematic Process Flow Diagram for Western Limb Tailings Recovery Plant 151 Table 53: Western Limb Tailings Retreatment Plant Production Forecast and Operational Data Figure 64: Western Limb Tailings Retreatment Plant Throughput Forecast Parameter Actual Budget C2018 C2019 C2020 C2021 C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 Total Feed (kt) 4,162 4,384 5,054 5,712 5,400, 5,400 5,400 5,400 4,500 Head Grade (g/t) 1.24 1.16 1.01 1.09 1.04 1.07 1.07 1.07 1.07 Concentrate Produced (kt) 51 32 25 31 27 27 27 27 22 4E Recovery (%) 35.0% 32.6% 34.8% 33.9% 30.5% 30.5% 30.5% 30.5% 30.5% 4E Metal Produced (koz) 58 53 57 68 55 57 57 57 47 152 Figure 65: Western Limb Tailings Retreatment Plant Production and Recovery Forecast 14.1.4 Chrome Retreatment Plant (CRP) The CRP treats Waterval UG2's primary rougher flotation tails in order to recover a saleable chromite concentrate. This plant has two modules each with the capacity to treat 220 ktpm tonnes of UG2 tailings (440 ktpm total capacity). Two product streams are realised from the CRP, these being chemical grade Cr2O3 greater than 43% with SiO2 less than 1% and metallurgical grade Cr2O3 greater than 40.5% with SiO2 less than 4%. The CRP is operated and maintained by Chrome Tech Holdings (Pty) Limited on behalf of Sibanye- Stillwater. The costs and revenues allocated to this operation are inputs into the financial model. Historically, CRP treated the UG2 final tail product. The CRP plant underwent an upgrade during 2016 whereby the UG2 Primary rougher flotation tails were rerouted to CRP for chromite extraction prior to Secondary milling and flotation circuit. As a result, the feed to the CRP has coarsened and the chromite head feed grade has increased. The reduction in downstream mill regrinds feed tonnage with a lower chromite contact resulted in improved liberation coupled with an increase in Secondary flotation residence times and lower percentage chrome in the Final Concentrate of Waterval UG2 Concentrator. The equipment in all plants is in good operating condition and well maintained by experienced staff in accordance with Sibanye-Stillwater’s maintenance procedures. Planned maintenance is conducted monthly during which all sections and equipment are inspected, evaluated and maintained.
153 14.1.5 Platinum Mile Concentrator (PMR) The PMR plant has 900 ktpm original nameplate capacity. Tailings are fresh arisings from UG2 Plant and Retrofit Plant Tailings (Figure 66). Additionally, tailings are re-mined from the E/W TSF; and are then pumped to the PMR plant for reprocessing. The process plant is divided into the following main circuits, namely: • Feed receiving • Milling • Flotation • Concentrate • Final tailings UG2 and Retrofit tailings feed is pumped into the plant on separate circuits. Retrofit tailings are eventually combined with E/W TSF-feed material. Feed from the West Feed re-mining is fed to the PMR through a regrind process at Retrofit Plant and pumped to the PMR. In the primary flotation circuit, the floated material reports as primary high-grade concentrate and is fed to the flotation cells for further upgrading. An intermediate grade concentrate is upgraded in further cleaning stages. The tails from the primary rougher cells are pumped to the final tailings thickener before being pumped to the TSF. Flotation concentrate from the various circuits is fed to the final concentrate thickener prior to being filtered and trucked to the Waterval Smelter. The recent history and budget operational parameters for the UG2 concentrator are presented in Table 53, Figure 61 and Figure 62. The C2018, C2019, 2020 and C2021 data presented reflect the actual annual performance whilst the C2022 to C2040 data represents current budget targets. The current operational methods and capacities are adequate. Metallurgical efficiencies projected have also been sustainably obtained historically and are thus reasonable budget targets. 154 Figure 66: The Schematic Process Flow Diagram for Platinum Mile Table 54: Platinum Mile Plant Production Forecast and Operational Data Parameter Actual Budget C2018 C2019 C2020 C2021 C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 Total Feed (kt) 7,711 8,035 8,489 10,637 10,886 10,868 10,852 10,564 9,346 4,834 4,254 3,700 Head Grade (g/t) 0.63 0.73 0.77 0.72 0.69 0.70 0.70 0.72 0.73 0.59 0.59 0.61 Concentrate Produced (kt) 9 12 20 17 23 23 23 22 20 10 9 8 4E Recovery (%) 11.2% 10.7% 18.5% 21.4% 16.8% 16.9% 16.8% 16.9% 16.8% 8.9% 8.9% 9.0% 4E Metal Produced (koz) 18 20 39 52 40 41 41 41 37 8 7 67 Parameter Budget C2030 C2031 C2032 C2033 Total Feed (kt) 3,180 3,086 2,950 2,967 Head Grade (g/t) 0.64 0.64 0.65 0.64 Concentrate Produced (kt) 7 6 6 6,230.7 4E Recovery (%) 9.0% 9.0% 9.0% 9.0% 4E Metal Produced (koz) 6 6 6 6 155 Figure 67: Platinum Mile Retrofit Concentrator Throughput Forecast Figure 68: Western Limb Tailings Retreatment Plant Production and Recovery Forecast 156 14.2 Future Projects The chrome recovery project using a different technology called Reflux Classification started in 2019. The reflux classifier project has been reviewed for feasibility and optimized to improve the recovery. Instead of receiving a feed from CRP (original design), RCMP receives its feed from the Final tailings thickener of Waterval UG2 Concentrator. The Final tail of RCMP is then returned to the Tailings disposal tank at Waterval UG2. 14.3 Sampling, Analysis, PGM Accounting and Security Adequate attention is given to sampling and sample preparation with a good accounting procedure in place. Input tonnage and grades are measured on the primary rougher feed stream and waste is sampled at the tailings thickener feed. The feed and tails stream samplers (SAMSTAT® samplers), installed at both Waterval UG2 Concentrator and Waterval Retrofit Concentrator, are continuous in-stream samplers. Samples from the continuous samplers are collected over an eight-hour shift. Process control analysis is performed on these samples. The eight-hour shift samples are composited into a single daily sample for metal accounting. Additional routine samples (for plant control purposes) are taken from the following points: • Primary Rougher flotation tailings, • Primary high grade cleaner tailings, and • Secondary cleaner tailings. As part of the audit plan, an audit of the Rustenburg Concentrator Evaluation function is performed on an annual basis to evaluate the design and effective operation of equipment, systems and controls, providing management with assurance that the key risks associated with the Evaluation function at the Rustenburg Concentrators are managed to an acceptable level. The audits addressed risks relating to: • Evaluation management and control • Mass measurement • Plant sampling, Sample preparation, Protocols (QA) Standard approved Rustenburg Concentrators sample preparation procedures and standard sampling procedures for all samples are well maintained. These procedures are adequate and comply with all approved regulations and internal audits. While security measures are in place at the Rustenburg Operations, operations management is continuing to refine security measures by increasing the level of sophistication where warranted. 14.4 Plant Lock-up The quantity of clean-up PGMs that can be anticipated on the closure of a concentrator or processing plant is uncertain.
157 14.5 Final Product The final product for Rustenburg is a concentrate that is smelted and refined by Anglo-American Platinum facilities in Rustenburg on agreed commercial terms. Further details are provided in Section 16. 14.6 Energy South African power utility Eskom is the main energy supplier to the Rustenburg operation. Grinding mills are the highest consumer of power at the Rustenburg process plants. The Rustenburg section comprises of the Retrofit and UG2 operation. The maximum installed power rating for the UG2 mills is 21.0 MW (there are two mills of 10.5Mw each, utilized for grinding purposes). The maximum installed power for the Retrofit Mills is 17.7MW (Primary mill – 10.5MW, 4 equally sized secondary mills at 1.8MW each). Two of the Retrofit secondary mills (1.8MW each) is utilized for processing of surface tailings material). The average monthly power consumption for UG2 (main grinding mills as well as all auxiliary pumping and float equipment) = ± 19 614 MW while the average monthly consumption for Retrofit (main grinding mills as well as all auxiliary pumping and float equipment) = ± 7 740 MW 14.7 Water Rustenburg operations receives process water from the Klipgat return water dam. The tailings stream from both the UG2 and Retrofit operations are pumped to Pt Mile scavenger plant. The barren tailings stream after all PGM’s have been removed by Pt mile scavenger plant is deposited onto the Paardekraal tailings complex. The tailings complex comprises of three tailings dams i.e. PK4, PK5 and Central. Water is recovered via a penstock decant system from each dam and collected in return water dams ( Phase 3 and Phase 4) and pumped to the Klipgat return water dam. Phase 1 return water dam also supplies process water to the Paardekraal return water dams. Rand Water Board supplies potable water to Rustenburg operations for domestic use. The average monthly potable water usage for UG2 = 32ML and for Retrofit = 12.6ML. 14.8 Personnel The complement for Rustenburg is ± 324 permanent employees. The compliment is broken up in 115 Retrofit employees, 174 UG2 employees and the remaining 35 residing at Central services. The management team is made up of one plant manager (3.1a) and one engineering manager (2.13.1) who is looking after the total footprint. An individual process superintended (2.6.1) is allocated to each plant. The plant manager reports to the VP of the Rustenburg/KDL operations (4.1 appointee). Middle management at Rustenburg is made up of three mechanical foremen (2 – UG2, 1- Retrofit), two Instrumentation foreman (1 per plant), two electrical foreman (1 per plant) and two boilermaker foreman (1 per plant). The operations runs 24 hours with 3 shifts on rotation. Each operation has 5 shift leaders (2.9.2), i.e. 1 per shift and 1 on a dayshift. 14.9 QP Opinion on Processing The QP is satisfied that the Mineral Processing is appropriate and sufficient to support the LoM and that all material issues have been addressed in this document. 158 15 Infrastructure 15.1 Overview of Infrastructure Engineering infrastructure at the Rustenburg Operations includes a wide range of operating technology, which varies in age and extent of mechanisation. Figure 69 shows the layout of the mine and the placement of shafts and other surface infrastructure within the mine boundaries. The infrastructure supporting each mine shaft and the concentrator plants within the Rustenburg Operations include the supply of electrical and emergency power, the supply of water services (including potable, effluent and process water), fuel storage and supply, compressed air supply, workshops, stores, roads, a rail network, various offices, change houses and accommodation facilities. Underground operations comprise access infrastructure to convey personnel, materials and equipment to and from the working areas and associated services to support mining operations. Horizontal infrastructure includes crosscut haulages, footwall haulage levels and declines/inclines. The infrastructure required for ore flow and services includes ore and waste passes, conveyor belts, rail conveyances, ore bins, loading stations, water dams, pump stations, secondary ventilation, workshops and power, compressed air and water reticulation systems. Surface infrastructure includes headgears and winding systems, primary ventilation, process facilities, office blocks and training centres, workshops and stores, lamp rooms, change houses and accommodation. There are also several services and supply centres. These include compressed air supply stations and minor workshops for small repairs to plant and equipment, surface fridge plants and pumping stations. Notwithstanding the age of the general infrastructure, all surface and underground infrastructure are reasonably maintained and equipped. In conjunction with the planned maintenance programs, including specific remedial action, the QP considers the current infrastructure; pumping; hoisting and logistic capacities to be considered adequate to satisfy the requirements of the LoM plan. Furthermore, the power generation and distribution systems, water sourcing and reticulation systems are appropriate as envisaged in the LoM plan. Anglo American Platinum owns, operates and maintains the Waterval Smelter, ACP, BMR, PMR and the new Western Limb Distribution Centre (WLDC) and these facilities are excluded from the Rustenburg Operations. Apart from the PMR, each of the operations being retained by owned and operated by Sibanye- Stillwater has dedicated electrical substation and switchyard infrastructure. 159 Figure 69: Locations of Major Surface Infrastructure at Rustenburg 15.2 Tailings Storage Facilities The Waterval complex has seven tailings storage facilities (TSFs) namely: Waterval East, Waterval West, Klipfontein, Hoedspruit, Paardekraal Central, Paardekraal PK4 and Paardekraal PK5. Rustenburg Operations currently operate two active TSFs namely; • Paardekraal Complex (Paardekraal Central, Paardekraal PK4 and Paardekraal PK5) • Hoedspruit. Retreatment of tailings is underway on Waterval West. Klipfontein was depleted to ground level with the footprint now undergoing open-pit mining. Waterval East was depleted in the fourth quarter of 2021. 160 15.2.1 Paardekraal Tailings Complex The Paardekraal tailings complex consists of three TSFs; Paardekraal Central, Paardekraal PK4 and Paardekraal PK5 (Table 55). The newest of the three TSFs, PK5, received its first tailings in 2007. It was estimated at the time that the total Rustenburg tailings (tailings material from Waterval UG2 and Retrofit) would increase from 970 ktpm to 1,120 ktpm with the introduction of the Retrofit project in 2007. The increase in the tailings deposition rate was above the acceptable rate of rise that could be accommodated by the Paardekraal Central TSF. The Waterval concentrator tailings are deposited onto the Paardekraal TSF Complex via the Platinum Mile Concentrator. Table 55: Paardekraal Central Planned Deposition Strategy **deposition to be confirmed 15.2.2 Hoedspruit Tailing Complex The Hoedspruit Tailings Complex was commissioned in 2003 with a footprint area of 598 ha. It caters for the deposition of re-processed tailings from the WLTR plant, re-processed tailings material from other local TSFs and for future TSF requirements when the Paardekraal TSF complex reaches its terminal height in 2030. The WLTR plant currently re-treats the Waterval West TSF material. Hoedspruit TSF was originally conceived (and design studies completed) to be double its current size. At the time the WLTR plant was built, had the option existed to lease the adjacent land from the Royal Bafokeng Nation (RBN) and essentially double the size of the Hoedspruit TSF. This option was however not pursued at the time because of costs and “excess to requirement” issues, but this could be revisited if necessary. Hoedspruit TSF’s original si ing was based on criteria to impound close to 1 billion tonnes on the Hoedspruit site. This would allow for potential future retreatment of the existing Paardekraal TSFs through the WLTR plant (or other concentrators) and deposit on an extended Hoedspruit footprint. 15.2.3 Waterval East and West TSF The WLTR plant was constructed to reprocess previously stockpiled tailings residue from the Klipfontein TSF. The Klipfontein TSF is completely remined. Reprocessing of the tailings from Waterval East and West TSFs at the Waterval Retrofit concentrator commenced in August 2015. The remining and reprocessing of Waterval East tailings through Retrofit concentrator was ceased in 2017. Platinum Mile concentrator Period Volume (in ktpm) PK Central PK4 PK5 Total Jan 2016 – Dec 2025 250 440 160 850 Jan 2026 – Mar 2030 280 410 160 850 Apr 2030 – Apr 2039 340 350 160 850 May 2039 – Nov 2041** 330 330 190 850 December 2040- 2051** To be planned closer to time of deposition
161 resumed the remining of Waterval East tailings in February 2020 through the redundant Retrofit regrind mills 3 & 4. The Waterval East dam TSF was depleted in quarter 4 of 2021. The Waterval East TSF was initially mined using hydropower by Fraser Alexander (contractor) in August 2015 until 2017 due to various operational challenges. Platinum Mile Concentrator constructed and commissioned a load, haul and repulping plant in 2019 and successfully commissioned the plant in February 2020. The process involved screening and repulping of the tails at the Waterval East TSF and pumping the pulp at a controlled density to the redundant regrind mills (3 & 4) at the Retrofit concentrator. After milling the tails through regrind mills 3 & 4 at Retrofit, the tails combined with the fresh ore tails were pumped to Platinum Mile for further reprocessing and recovery of a saleable concentrate. The combined final tails were deposited to the Paardekraal TSF complex. The WLTR process now derives feed from only the Waterval West TSF. The tailings are mined, loaded and hauled from the West TSF to the Klipfontein slurrying/pumping site. The Waterval West TSF tails are then subjected to hydro-mining. The re-slurried tailings gravitate to a low-lying catchment area, where it is initially screened and then pumped to the WLTR plant. The milled product is fed to a cyclone cluster for classification. Cyclone underflow is returned to the mill with the overflow fed to the primary flotation circuit. In primary flotation, the floated material reports as primary high-grade concentrate and is fed to flotation cells for further upgrading. An intermediate concentrate grade is upgraded in further cleaning stages. TSFs Composition The TSFs represent the waste product from the processing of PGM and chrome ores. The primary economic mineralisation of importance on the TSFs is 4E. By-products to the re-processing of the tailing’s material are available chrome and the base metals (Cu, Ni & Zn). 15.2.4 LoM Deposition There is sufficient capacity to accommodate all tailings from the planned LoM as shown in Table 56. Table 56: LoM Assessment of Tailings Facilities Tailings Facility LoM Deposition (Mt) Available Capacity (Mt) Surplus / (Shortfall) (%) Capital Requirement (ZARm) Paardekraal - Central (Consolidated PK1, PK2 and PK3) 129 179.7 50.7 39.3% 0 Paardekraal - PK4 15 111.6 96.6 644.0% 0 Paardekraal - PK5 45 110.5 65.5 145.6% 0 Hoedspruit 132.5 132.5 - 0 162 Total 534.3 15.3 Power Supply Power is supplied to the Rustenburg Operations by Eskom, the local supply utility. The Eskom 400 kV Marang and Trident Main Transmission Stations (MTS) supply power to 12 consumer substations at the Rustenburg Operations. At the consumer substations, the voltage is stepped down to either 6.6 kV or 11 kV and distributed via a combination of cabling and overhead lines to the various onsite consumers Table 57. Power Distribution and Transmission The current consumer substation supplies the following major loads: • Mines, • surface infrastructure, • underground infrastructure, • ventilation and refrigeration, • air compressors, • underground mining equipment, • Concentrators, located close to the substations, • Central Services infrastructure, • west 10 air compressors, • on-mine accommodation and • workshops and central offices. Table 57: Installed Power Capacities. Consumer substation Actual MD (Jan '17) Contractual NMD (MVA) Installed transformers 7 Year peak MVA Installed capacity for standard supply (MVA) Total installed capacity for premium supply (MVA) Forecast Future MD (MVA) Communition (Retrofit concentrator) 39. 46 3 x 40MVA, 88/11 kV 1 x 20MVA88/1 I kV 692 120 140 0 Plats (Central Logistics) 4. 6 3x 10MVA 88/6.6kV 7. 30 30 4 Paardekrad (6th Point) (Khomonani I &2, Thembelani 1) • 31. 41 4 x 20MVA 88/11 kVA 44. 60 80 38 Incline- Boschfontein (7th Point) (Khuseleko 2) " 24. 31 3 x 20MVA.88/11kV 27. 40 60 21 163 Consumer substation Actual MD (Jan '17) Contractual NMD (MVA) Installed transformers 7 Year peak MVA Installed capacity for standard supply (MVA) Total installed capacity for premium supply (MVA) Forecast Future MD (MVA) Shaft (Townlands) (Khuseleka 1) 20. 24. 3 x 20M VA, 88/6.6kV 22 40 60 25 Turffontein (Siphumelele) 19. 20 2 x 20 MVA, 88/6.6kV 3 x 20MVA 88/11kV 49. 60 100 42 Concentrator (UG2 concentrator) 44. 47 4 x 20MVA 88/11kVA 53. 60 80 42 Compressor (West 10) 11. 15. 4 x (2x5)MVA,88/6. 6kV I x 20MVA,88/11kV 22. 40 60 17 RUSTB - Tailings 21. 31. 4 x 20MVA, 88/1IkVA 40. 60 80 21 Frank (Paardekraal 2) Thembelani 2 (New 33kV sub) A 1. 8 2 x 40 MVA, 88/33kV 3. 40 80 1 Emergency Power Rustenburg Operations have an established emergency procedure in the event of an electrical power interruption, consisting of a prioritised shut down procedure of non-essential activities, in parallel with the start-up procedure for the generator plants to power critical systems including ventilation, dewatering and winders. Emergency ventilation is achieved by diesel-driven fans. The generating plant consists of six diesel generators producing 3 MW each (installed in 2011) supplying the Khuseleka, Khomanani, Siphumelele and select consumer substations, to ensure the safety and protection of underground mine personnel and equipment. Thembelani Mine is fed from the generators stationed at Khomanani Mine. The electrical, control and instrumentation works of the old diesel generators were recently upgraded, but it is a concern that mechanical spares may not be available and that it may not be possible to repair these generators, should there be a serious mechanical breakdown. The new set of six generators was commissioned during 2013 and 2014. The units are all in good condition and well maintained as per Sibanye-Stillwater maintenance procedures. 15.4 Bulk Water, Fissure Water and Pumping See Section 17.5.6 for more information on Bulk Water, Fissure Water and Pumping. No pipeline infrastructure components are material to the Rustenburg operations. 164 The situation and susceptibility to flooding vary significantly from one mine to the other. There is always dam over-capacity to cater for surges and pumping systems outages for maintenance, power outage, etc. All pump stations are designed on the “N+1” principle, meaning that there is always at least one standby pump available at all times. The main risk would be a power outage during the rainy season. To cater for this risk, additional emergency generating capacities were installed in 2010-2011. Rainfall in the Rustenburg area is very variable and occurs mainly as thunderstorms and heavy showers. Flood and drainage systems have been designed accounting for 1 in 100-year 24-hour storm water run-offs. The Hex River fault runs through the Rustenburg western section resulting in a number of identified aquifers. The deep aquifer system has been significantly modified by the presence of the open mine workings in the mined-out areas on the Merensky Reef, which currently occupy approximately 60% of the lease area, from the surface in the south to a depth of 600-1,200m in the north. The intersection of deep water-bearing fractures in the mine workings provides groundwater discharge points and continuous local dewatering of the deep aquifer. 15.5 Roads The road network on the Rustenburg Operations consists of paved and unpaved roads, which are primarily used for the transport of personnel and for access to the offices, shafts, plants and infrastructure positioned around the mine site. Rail and port infrastructure are not required as the product is transported by road to the local smelter and refineries and by road or commercial airlines to the end consumer. 15.6 Equipment Maintenance 15.6.1 Surface Workshops Surface workshops for major repairs were converted to off-site repair facilities operated by third party suppliers in the neighbouring towns. Only minor repairs are done on the shafts. 15.6.2 Underground Workshops Underground workshops are used for routine maintenance of equipment. All areas are well equipped. Facility configuration depends on the equipment that is being serviced to ensure compliance as per the requirements of the planned maintenance schedules. Areas are well ventilated and illuminated, floor areas are concreted. 15.7 Offices, Housing, Training Facilities, Health Services Etc. The Rustenburg Operations has central offices at various mines for shared services and offices at the shafts and plants for mine services. Rustenburg Operations are near several towns and cities where some of the mine personnel live. The mine also provides mine housing and hostels for some of the personnel. Transportation from high density
165 areas serving the mine is operated by a third-party, otherwise, all transportation is public services or personal vehicles. Training facilities through the Sibanye Platinum Academy and central training located in Rustenburg (see adjacent properties Section 20). Primary Health services are centralised at Rustenburg Operations shared by the Sibanye Platinum Operations. 15.8 QP Opinion on Infrastructure The QP is satisfied that the infrastructure is appropriate and sufficient to support the LoM and that all material issues have been addressed in this document. There are no other infrastructure components that are material to the Marikana operations. 166 16 Market Studies 16.1 Concentrates and Refined Products The concentrate is treated by way of a Toll Refining and Purchase agreement with Anglo American Platinum Rustenburg. Pt, Pd, Rh and Au are toll refined (i.e., the metal is returned to Rustenburg Operations). Ru, Ir, Ni and Cu contained in the concentrate is sold to Anglo American Platinum Rustenburg. 16.2 Metals Marketing Agreements Refined 4E metals are returned to Rustenburg under the toll arrangement while the other PGMs and base metals are sold to the 3rd party under the purchase of concentrate arrangement. Approximately 70% of the refined 4E metals returned to Rustenburg are contractually committed to three global customers on medium-term contracts 1-2 years in duration. The remainder of the production is sold into the market on a spot basis to a network of customers around the world. Contract volumes and prices are agreed with each customer and will depend on various market and customer conditions at the time. No customers are affiliates of Sibanye-Stillwater. 16.3 Markets 16.3.1 Introduction Information on PGM, including gold, markets is widely available in the public domain. Major refiner and manufacturer of products using PGM, Johnson Matthey regularly publishes market reports. In addition, Sibanye-Stillwater has commissioned an independent PGM market study by its research company, SFA Analytics (SFA(Oxford). This information along with negotiated contracts informs Sibanye-Stillwater’s price and sales predictions. Below is an extract on Supply and demand from the SFA Oxford market study, March 2022. The usefulness of PGMs is determined by their particular chemical and physical properties. Certain of these properties are shared by other materials, but it is the unique combination of properties that makes the PGMs so valuable in their end-markets. The PGMs have high and specific catalytic activity, high thermal resistance, are chemically inert, biocompatible and are hard but malleable for forming into shapes. All the PGMs are constantly subject to risks of substitution from cheaper alternatives, but in most applications their unique properties render them relatively secure. The high cost of PGMs inevitably drives efforts to use lower quantities through thrifting, thereby reducing the loadings in applications. 16.3.2 Demand Summary The main uses of platinum are as a catalyst for automotive emissions control, in a wide range of jewellery pieces and in industrial catalytic and fabrication applications. Palladium is primarily used as a catalyst in the automotive sector, mainly in gasoline-powered on-road vehicles, but alongside platinum in parts of the light-duty diesel engine after-treatment too. The second main use of palladium is in electrical components, specifically in multi-layer ceramic capacitors (MLCCs), as conductive pastes and in 167 electrical plating. Rhodium is used almost solely in the automotive sector, with a small amount used in the glass, chemical and electrical industries. Table 58 illustrates the PGM demand in 2021. Table 58: PGM Demand 2021 Platinum Demand Palladium Demand Rhodium Demand • Autocatalysts (primarily for diesel engines • Wide range of jewellery • Many industrial uses • Autocatalysts (primarily for gasoline engines • Electrical components • Many chemical applications • Autocatalysts • Chemical catalysts • Glass fabrication • Electrical components Source: SFA (Oxford). Note: Excludes physical investment products. All statistics and their analyses are accurate as of March 2022. 16.3.3 Supply Summary The majority of PGM resources are located in Southern Africa Table 59 which accounts for over 80% of global PGM resources (Crowson, 2001 quoted in Cawthorn, 2010). Russian PGM supply, with the exception of PGMs produced in the Kondyor, Koryak and Urals regions, is mostly generated as a by-product of nickel mining (from Nornickel) and is the world’s largest source of palladium. Russia is also the second-largest producer of platinum and rhodium, accounting for approximately 25% of the world’s total PGM supply in 2021. Other key platinum mining regions include Zimbabwe’s Great Dyke, the Stillwater Complex in the US and the Sudbury Basin in Canada(Table 59). Auto, 2751 koz, 41% Jewellery, 1751 koz, 27% Chemical, 660 koz, 10% Glass, 479 koz, 7% Medical, 234 koz, 3% Others, 816 koz, 12% Pt demand: 2021 6.7 moz Auto, 7688 koz, 81% Jewellery, 215 koz, 2% Elect., 659 koz, 7% Chem., 654 koz, 7% Dental, 183 koz, 2% Others, 137 koz, 1% Pd demand: 2021 9.5 moz Auto, 941 koz, 89% Chem., 61 koz, 6% Glass, 18 koz, 2% Others, 39 koz, 4% Rh demand: 2021 1.1 moz 168 Table 59: Platinum Supply 2021 Platinum Supply Palladium Supply Rhodium Supply Source: SFA (Oxford) All statistics and their analyses are considered accurate as of March 2022. The near to medium term fundamental outlook for PGMs is robust. As the largest primary producer and recycler of PGMs in the world, Sibanye-Stillwater’s investments into the high return, organic growth projects positions us well to support PGM demand driven by increasing social pull and regulatory drive for a cleaner environment. Climate change targets in Europe and other parts of the world have resulted in renewed interest in the hydrogen economy. Longer term production of green hydrogen for industrial use is supportive of demand for both platinum and iridium. With the medium-term evolution of the automobile drive train from internal combustion engines (ICE) to greener technologies, such as battery electric fuel cell electric and hybrid vehicles Sibanye-Stillwater continue to monitor and evaluate the sector for entry points that meet our strategic objectives. As our customers’ needs change, the opportunity for us to further build on our mining platform and diversify our offering will ensure that we remain preferred suppliers of strategic metals for tomorrow’s powertrains. Figure 70 illustrates the palladium, platinum and rhodium price trends since 2000, expressed as nominal USD/oz. S. Africa, 4703 koz, 74% Zimb., 493 koz, 8% Russia, 643 koz, 10% Canada, 215 koz, 3% USA, 150 koz, 2% Other, 161 koz, 3% Pt supply: 2021 6.4 moz S. Africa, 2742 koz, 39% Zimb., 414 koz, 6% Russia, 2587 koz, 37% Canada, 499 koz, 7% USA, 501 koz, 7% Other, 333 koz, 5% Pd supply: 2021 7.1 moz S. Africa, 666 koz, 82% Zimb., 44 koz, 5% Russia, 73 koz, 9% Canada, 18 koz, 2% USA, 4 koz, 0.5% Other, 8 koz, 1% Rh supply: 2021 0.8 moz
169 Figure 70 : Price trends 2000-2021 Source: SFA (Oxford) All statistics and their analyses are accurate as of March 2022. 16.4 Metals Price Determination Sibanye-Stillwater considers multiple trailing averages and forecasting scenarios for the determination of the commodity prices and exchange rates used as modifying factors for estimating Mineral Reserves. Mineral Reserves are estimated before the end of the calendar year. Sibanye-Stillwater uses the Q2 actuals process and forecasts for the remainder of the year to 31 December. The following are the commodities produced at Kroondal, the scenarios considered and the final parameters chosen. Additional comment on Risk is provided in Section 21.1.2. 16.4.1 Exchange Rate The three-year average ZAR/USD exchange rate parameters are given in Table 60. Table 60: Exchange Rates Three Year Average July 2017 to June 2020 30 Months Average January 2018 to June 2020 Forecast to December 2020 Three Year Average January 2018 to December 2020 Mineral Reserve Price ZAR/USD exchange rate 14.29 14.49 17.00 14.92 15.00 16.4.2 Platinum Group Metals Price Deck The three-year average prices for the Platinum Group Metals (PGM) are tabulated below. For the Platinum Group Metals price deck, the QP forecasted the metal prices to the end of 2021 in order to determine a three-year average. The QP has declared PGM Mineral Reserves with the metals process as in Table 61. 0 5,000 10,000 15,000 20,000 25,000 30,000 0 500 1,000 1,500 2,000 2,500 3,000 3,500 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 $/oz PGM prices Platinum Palladium Rhodium (rhs) 170 Table 61: PGM Deck Price Scenarios Unit Three Year Average July 2017 to June 2021 30 Months Average January 2019 to June 2021 Forecast to December 2021 Three Year Average January 2019 to December 2021 Mineral Resource Price Mineral Reserve Price Platinum USD/oz 959 934 1,125 965 1,500 1,250 Palladium USD/oz 2,164 2,013 2,722 2,132 1,500 1,250 Rhodium USD/oz 12,611 10,658 21,250 12,423 10,000 8,000 Iridium* USD/oz 2,463 2,261 5,725 2,839 3,000 2,500 Ruthenium* USD/oz 290 283 700 353 350 300 Nickel* USD/tonne 15,128 14,567 17,943 15,130 17,500 16,200 Copper* USD/tonne 6,819 6,688 9,612 7,176 10,000 8,950 Cobalt* USD/lb 17 17 21 17 25 22 Chrome* USD/tonne 143 147 153 148 165 150 Gold USD/oz 1,723 1,644 1,806 1,671 1,800 1,659 Basket Price USD/4Eoz 2,310 2,086 3,297 2,288 2,208 1,815 Basket Price R/4Eoz 35,894 31,843 45,847 34,406 33,121 27,228 *Not included in the Basket Price 16.4.3 Comparison to 2019 Prices Table 62 gives the price comparison between the Mineral Reserve prices at 31 December 2020 and 31 December 2021. Table 62: Comparison of Mineral Reserve Prices Current and Previous Year 31-Dec-21 31-Dec-20 Precious metals USD/oz R/oz R/kg USD/oz R/oz R/kg Gold 1659 24,855 800,000 1,500 22,500 720,000 Platinum 1250 18,750 602,826 880 13,200 424,389 Palladium 1250 18,750 602,826 1,600 24,000 771,617 Rhodium 8000 120,000 3,858,084 5,650 84,750 2,724,772 Iridium 2500 37,500 1,205,651 1,450 21,750 699,278 Ruthenium 300 4,500 144,678 260 3,900 125,388 Base metals USD/lb USD/tonne R/tonne USD/lb USD/tonne R/tonne Nickel 7.35 16200 243,000 5.90 13,000 195,000 Copper 4.06 8,950 134,250 2.72 6,000 90,000 Cobalt 22.00 33,069 727,525 15.00 33,069 496,040 Chromium oxide (Cr2O3)2, (42% concentrate)1 0.07 150 2,250 0.07 160 2,400 171 17 Environmental Studies, Permitting, Plans, Negotiations/ Agreements with Local Individuals or Groups 17.1 Social and Community Agreements 17.1.1 Overview- Mine Community Development Rustenburg Operations’ social performance is guided by our socio-economic development agenda, which is aimed at ensuring that the Rustenburg Operations contribute to the upliftment of the communities and environments in which Sibanye-Stillwater operates during and beyond mining activities. Sibanye-Stillwater’s performance will be supported by authentic stakeholder engagement, fit for purpose systems, credible data and capability that aligns with international standards and locally negotiated commitments. Sibanye-Stillwater’s primary objective is to avoid harm to people and the environment, ensuring a stable operating environment in which all our stakeholders within the Company's footprint can derive value during the LoM. Sibanye-Stillwater will endeavour to create equitable engagement capability in host communities to ensure constructive dialogue with our neighbours. The key to responsible mining is protecting the Company's reputation as work continues building the Sibanye-Stillwater brand globally. In line with Sibanye-Stillwater’s approach to creating and sharing value, in 2020/118, Rustenburg operations conducted broad based developed a stakeholder engagement and a socio-economic baseline to understand the socio-economic needs of stakeholders’ perception index to measure and monitor stakeholder perceptions. Initial testing of the index was conducted among selected stakeholder groupings, The index revealed historic perceptions of a culture of non-engagement. Specifically, there was a perceived lack of transparency in procurement processes, environmental issues, care and maintenance, and socio-economic development programs. The same engagement highlighted gaps in the municipality-led Integrated Development Plan (IDP) process, which is meant to determine and prioritize the needs of communities that ultimately inform our social and labour plans (SLPs). There was also an apparent misunderstanding of SLP funding and related responsibilities. Communities expressed frustration, believing that the mines do not respond to their grievances, particularly in relation to Corporate Social Investment (CSI) programs, procurement and employment. To this end, the Company put in place a mechanism to ensure that a formal, proactive and responsive process is in place to deal with stakeholder grievances. The findings support the feedback the Company regularly receives from its engagement partners and therefore engagement and communication have been strengthened to ensure that stakeholders are informed and where applicable engaged and consulted on issues of mutual interest. 17.1.2 Vision Sibanye-Stillwater’s vision is to unlock the potential of communities affected by its operations through economic empowerment, institutional development and creating a local benefit that inspires sustainable living. 172 17.1.3 Communities’ Priorities Rustenburg community priorities are as follows: • Supporting communities to deliver local social economic benefits through economic empowerment and the delivery on the Mining Charter and Social and Labour Plan commitments • Strengthening institutional capacity and unlocking and mobilizing partnerships and resources to resolve collective challenges • Deliver on programs that retain sustainable community benefits and its social impacts that are well understood by all stakeholders • Create shared value beyond compliance • Facilitate integrated spatial development by improving the living conditions and surrounding amenities for our workers. The 3rd generation Social and Labour Plan (SLP) (2021-2025) has been submitted to the DMRE and awaiting approval. The 2nd generation (2016-2020) SLP Social and Labour Plan (SLP) expired in 2020 and the table below provides the list and status of the projects set out in this specific SLP. 17.1.3.1 Projects Progress The SLP projects for Rustenburg operations are listed in Table 63:
173 Table 63: SLP Projects for Rustenburg (2016-2020) No Project Name Status Year of Completion 1 Support Learner Development Completed 2017 2 Supply of Emergency Patient Transport for Maternal and Obstetric Units (2 Ambulances) Completed 2018 3 ED Support and Linkage: Portable Skills Completed 2018 4 Boikagong Primary School Renovations Completed 2019 5 ED Support and Linkage: Ikemeleng Youth Completed 2020 6 Conversion of Boitekong Dilapidated school into a technical school Completed 2020 7 Support the Expansion of Health Promotion and Disease Prevention Completed 2020 8 ED Support and Linkage: SEDA Platinum Incubator Completed 2020 9 Waterborne Sanitation- Mfidikoe Completed 2021 10 Improving of Health Infrastructure (Mfidikoe Clinic) Completed 2021 11 Support To Teacher Development Completed 2021 12 ED Support- Thekwane Poultry Project Completed 2021 13 ED Support- Photsaneng Bakery Project Completed 2021 14 ED Support-Development of Rankelenyane Piggery Completed 2021 15 Supplemental Learning and Teaching Support Material Completed 2021 16 School Leadership Development Completed 2022 17 ED-Support-Development of Boschfontein Sewing Project Practical Completion 2022 18 ED-Support and Linkages: Phatsima Farming Project Practical Completion 2022 19 High Mast Lights Lefaragatlha/Bobuantswa – Practical Completion 2021 Bokamoso - In progress 2022 20 ED-Support-Development of Boitekong Piggery Project In Progress 2022 21 Construction of Walkway Bridge between Sunrise Park and Popo Molefe In Progress 2022 22 Mfidikoe Primary School extension In Progress 2022 23 Access road to Tlapa Section 102 awaiting DMRE approval 2022 24 ED-Support and Linkages: Compost Manufacturing Section 102 awaiting DMRE approval 12/2022 17.2 Human Resources 17.2.1 Introduction This section includes discussion and comment on the human resources, health and safety related aspects associated with Rustenburg operations. Specifically, information is included on the current organisational structures and operational management, recruitment, training, productivity initiatives and remuneration policies, industrial relations, safety statistics and performance. 174 Rustenburg Operations follows the Sibanye-Stillwater Code of Ethics, which is fully compliant with the Sarbanes-Oxley Act of the United States of America. This policy was adopted and communicated to all employees. A Human Rights Policy has also been adopted, which confirms full compliance with all applicable International Labor Organisation Conventions. 17.2.2 Human Resources 17.2.3 Legislation Rustenburg Operations are committed to promoting Historically Disadvantaged South African’s (HDSA) in its management structure by instituting a framework geared toward local recruitment and human resources development(Table 64). Vacancies are primarily filled by candidates from local communities. Where specialist skills are not available locally, they are sourced from outside local communities. The Mine’s long-term objective is to have these skills shortages addressed via skills development programs( Table 65 and Table 66). Labour distribution and availability are shown in (Table 67and Table 68). Various regulatory authorities, in addition to mining and labour codes, govern labour legislation in South Africa. In general, these are well established in conjunction with current operating policies and form the cornerstone of human resource management. High-level compliance in terms of the following key acts and associated regulations was assessed by the QPs: • Constitution of the RSA (Act 108 of 1996) (Constitution). • Mine Health and Safety Act, (Act 29 of 1996) and amendments (MHSA). • The Occupational Health and Safety Act (85 of 1993) (OHSA). • Labour Relations Act, 1995 as amended. • Employment Equity Act, 1998 with specific reference to medical testing and HIV/AIDS. • Compensation for Occupational Injuries and Diseases Act, 1993. • Basic Conditions of Employment Act, 1997. • Employment Equity, 1998 and • Promotion of Equality and Prevention of Unfair Discrimination Act, 2000. Table 64: Undertaking and Guidelines Table 65: HDSA in Management as at 31 December 2021 Prescribed Target Current Prescribed % by 2024 Occupational Level/Paterson Band Designated Non- Designated % Compliance Undertaking Rustenburg Operations are committed to attaining the 40% HDSAs in management target as set by the DMRE and recognizes that this refers to Management in the D, E and F Patterson bands. Guidelines Build capacity within the organisation through Human Resource Department (HRD) initiatives with preference given to individuals from designated groups. These employees to form the pipeline for the Company’s talent pool and succession planning. 175 Top Management (Board)* 50% 50.0% Senior Management (EXCO)* 50% 38.5% Senior Management (Other)* 60% 15 27 36% 60% Middle Management Levels 70% 12 24 50% 70% Junior Management Levels 70% 99 83 54% 70% Total HDSAs in Management(Including Junior Management) 125 140 47% *These numbers are reflected in accordance with the Mining Charter requirements and these individuals are not employed by the operation. Table 66: Breakdown of Employee Profile as at 31 December 2021 Grade Occupational Level Number of Employees E Band Senior Management 22 D Band Professionally Qualified, Experienced Specialists and Middle Management 181 C Band Skilled Technical, Academic Qualified, Junior Management and Supervisors 2,026 B Band Semi-Skilled and Discretionary Decision Making 8 ,675 A Band Unskilled and Defined Decision making 1,348 NG Learners and Trainees 80 Total Permanent and Temporary Employees 12,332 Employee - Temporary 377 Contractor Employees 3,196 Total Head Count 15 905 Table 67: Employee Turnover Reason 2018 2019 2020 2021 Death 34 65 76 124 Desertion 15 87 37 71 Dismissal 59 194 139 129 Medical board 45 104 75 165 Group Transfer 0 0 0 0 Relocated to Contractor 0 0 0 0 Resignation 155 274 260 324 Retirement 58 138 274 180 Retrenchment(VSP & MSP) 72 30 0 0 Grand Total 446 892 864 993 176 Table 68: Labour Unavailability and Absenteeism Description 2018 2019 2020 2021 Mine accident 0,2% 0,3% 0,2% 0,3% Sick 5,5% 4,8% 3,0% 5,3% Occupational health 0,0% 0,0% 0,0% 0,0% Unpaid leave 0,0% 0,0% 0,0% 0,0% AWOPs 0,6% 0,7% 0,5% 1,4% Training 1,7% 1,9% 0,8% 1,7% Leaves 7,6% 7,7% 3,2% 7,3% Other 0,9% 1,1% 10,0% 1,3% 17.2.4 Human Resource Development (Training) Sibanye’s Human Resources Development (HRD) Model aims to ensure development of requisite skills in respect of learnerships, bursaries (core and critical skills), artisans, Adult Education and Training (AET) (Level I, II, III), AET Level 4/NQF Level 1 and other training initiatives reflective of demographics as defined in the Mining Charter and MPRDA. All efforts in this regard have been aligned with the National Development Plan and the UN Global Goals for Sustainable Development in relation to education, gender equality, reduced inequalities, decent work and economic growth. • Specific areas of focus in the training and development programmes include: Safe working practice training by means of programmes aligned with the requirements of the National Qualifications Framework. • Functional literacy and numeracy. • Interventions aimed at improving the business awareness and teamwork of employees at the lower levels of the organisation in particular. • Improved middle management skills through the implementation of an internal leadership programme to help fulfil the human resources requirement of the Mining Charter. • Systems to track and manage, on an integrated basis, employee development and performance. • Portable skills training. • Cadet training. • Safety training • Mining skills training • Engineering skills training 17.2.5 Remuneration Policies Rustenburg operates remuneration and employee benefits policies that recognize labour market conditions, collective bargaining processes, equity and legislation. The provisions of the Sibanye- Stillwater approval framework guide remuneration policies.
177 17.2.6 Industrial Relations Industrial relations are managed at a number of levels and in a number of formalised structures, encompassing the corporate and mining asset domains in accordance with a number of key driving factors. These include the prevailing legislative requirements, regulatory bodies, labour representation, collective bargaining arrangements, operation specific employer-employee agreements, and the quality of labour relations management philosophies and practices. An Employee Relations/Engagement framework also governs all engagements with organised labour and other stakeholders. The principal strategy elements are to entrench an improved understanding of the business imperatives on the part of labour, appropriate and timeous intervention to pre-empt industrial relations issues and timely delivery by management on its undertakings to labour. Some 71% of the permanent employees of Rustenburg are paid up members of registered trade unions and associations. Most of these unionised employees are from the lower category employees are represented by the Association of Mining and Construction Workers Union (AMCU). Employees in the skilled and supervisory categories are represented by the United Association of South Africa(UASA). Historically, trade unions with such a power base have exercised a strong influence over social and political reform. The labour legislative framework reflects this by strongly empowering trade unions in the collective bargaining processes. The clear implication is that industrial relations are an area of critical focus for Sibanye-Stillwater. 17.2.7 Employment Equity and Women in Mining (WIM) The purpose of the Employment Equity Plan is to ensure that a demographically appropriate profile is achieved through the participation of HDSAs in all decision-making positions and core occupational categories at the Operation. In striving to achieve a 40% HDSA composition in the management structure and 10% participation of women in core mining occupations, Sibanye-Stillwater seeks to redress the existing gender and racial disparities. The plan reflects Sibanye-Stillwater’s annual progressive targets and embraces the challenge to transform the composition of the Company’s workforce and management. This is a business imperative to ensure that we tap into the entire skill base of the South African population. All efforts in this regard have been aligned with the National Development Plan and the UN Global Goals for Sustainable Development in relation to: • no poverty. • zero hunger. • quality education. • gender equality. • decent work and economic growth and • reduced inequalities. Employment Equity Strategies are aligned to succession planning, development of the Company’s talent pool, learner development programs, core and critical skills training programs, career development plans, mentoring and coaching. The following Sibanye-Stillwater principles guide the way in which Employment Equity is implemented at Rustenburg Operations and to further comply with our Ethics and Human Rights policies: 178 • Recognizing historic inequalities, HDSAs and women with recognised potential are afforded special opportunities and additional support to realize their potential. • To fill each position in the Company with a fully performing individual. Thus, we will not create phantom jobs nor make token appointments. • Diversity is encouraged in the workplace and any form of racism is not tolerated. • Some employees in management positions may be involuntarily redeployed to make space for HDSAs and women. • All employees are developed to ensure that they are fully performing in their current jobs and, where applicable, to prepare them for future opportunities and • In placing women in jobs, the Company will take cognisance of the special risks to which women of child-bearing age, pregnant and lactating women should not be exposed. Rustenburg Operations are required to translate the Sibanye-Stillwater company strategy to five (5) year Statutory and action plans that are implementable and measurable. Sibanye-Stillwater is committed to create a workplace in which individuals of ability and competency can develop rewarding careers at all levels regardless of their background, race or gender. Sibanye-Stillwater’s employment practices and policies emphasize equal opportunity for all, and aim to identify, develop and reward those employees who demonstrate qualities of individual initiative, enterprise, commitment and competencies. Employment Equity policies also aim to create an inclusive organisational culture in which all employees are valued. The implementation of Employment Equity is overseen by senior management and is at the core of the mine’s strategy. Where appropriate, Employment Equity is implemented in consultation with employee representative bodies. As a key business imperative for Rustenburg Operations, Employment Equity is critical in assisting the Operation (Table 69 and Table 70) to place competent employees in the correct jobs aligned with the Operation’s objectives. These are: • Sibanye-Stillwater is committed to developing its employees to their greatest potential, which will contribute to the achievement of the Operation’s objectives, • Sibanye-Stillwater recognizes the need for continued investment in its employees through training and development, which is demonstrated through training and development opportunities and job placements with a focus on the development of key competencies, career path progression and retention of talent and • Sibanye-Stillwater has adopted a proactive recruitment, selection and appointment policy, which favours candidates from designated groups. This has assisted the Operation in working toward the achievement of numerical goals of the Operation’s Employment Equity Plan. Table 69: Rustenburg Total Employees – Snapshot Report for the Month December 2021 Occupational Levels Male Female Foreign Total A C I W A C I W M F Senior management 6 0 1 11 2 0 0 1 1 0 22 Professionally qualified and experienced specialists and mid- management 56 1 1 19 23 0 0 76 4 1 181 179 Skilled technical and academically qualified workers, junior management, supervisors, foremen, and superintendents 1,132 12 6 316 368 3 1 73 111 4 2,026 Semi-skilled and discretionary decision making 5,945 6 1 17 859 0 0 7 1,839 1 8,675 Unskilled and defined decision making 724 0 0 9 503 0 0 0 108 4 1,348 Non graded 57 0 0 1 17 0 0 0 4 1 80 TOTAL PERMANENT 7,920 19 9 373 1,772 3 1 157 2,067 11 12,332 Table 70: Rustenburg Total Contractors (excluding Ad-Hoc Contractors) Occupational Levels Male Female Total A C I W A C I W Senior management 7 1 0 26 3 0 0 0 37 Professionally qualified and experienced specialists and mid- management 5 0 0 4 3 0 0 0 12 Skilled technical and academically qualified workers, junior management, supervisors, foremen, and superintendents 296 11 4 139 56 0 0 13 519 Semi-skilled and discretionary decision making 884 0 0 10 103 2 1 13 1,013 Unskilled and defined decision making 973 6 0 40 495 2 0 0 1,516 TOTAL PERMANENT 2,165 18 4 219 660 4 1 26 3,097 17.3 Health and Safety 17.3.1 Policies and Procedures Since Sibanye-Stillwater’s inception the Rustenburg Operations has formed part of the Health and Safety Strategy and Policy development process, as well as the adoption and implementation thereof. The Safe Production Strategy that was developed as part of an ongoing safety improvement journey takes into account “fit for purpose systems” such as ISO 45001 that was published in 2018. The Sibanye- Stillwater Health and Safety Strategy and Policy are further aligned with the Mine Health and Safety Act, the International Council on Mining and Metals, the World Bank Policies and Guidelines, International Finance Corporation Operational Policies and International Labour Organisation Conventions. 17.3.2 Statistics Table 71 presents safety statistics for Rustenburg Operations and includes the total number of fatalities, fatality rate and the lost day injury frequency rate (LDIFR) from C2016 to C2021. 180 Table 71: Safety Statistics Safety Statistics Units C2016 C2017 C2018 C2019 C2020 C2021 Fatalities (No.) 4 2 2 4 2 3 Fatality Rate (per mmhrs) 0.12 0.07 0.05 0.10 0.07 0.10 LDIFR (per mmhrs) 5.74 4.57 3.83 4.55 4.78 5.11 MHSA Section 54’s (No.) 28 14 17 18 10 15 mmhrs = million man hours worked 17.3.3 Occupational Health and Safety Management As part of the rollout of the Safe Production Strategy, the management of Critical Controls, Rules of Life, Risk Management as well as management of A Hazards were a key focus area at the operations. The challenges in terms due to COVID-19 are ongoing and are dealt with commendably all at the shafts. Rustenburg Operations achieved one million million fatality-free shifts on 31 July 2021 prior to the fatalities. 17.3.4 HIV/AIDS Prevalence of HIV/AIDS at the Sibanye-Stillwater’s Rustenburg is currently at around 15% of the workforce. However, impact on sick absenteeism and mortality due to this pandemic is relatively low. This is attributed to the development and implementation of effective and comprehensive HIV/AIDS programme, which includes the following elements: • Creating a supportive workplace environment, where discrimination is not tolerated to allow employees with HIV/AIDS to remain employed and productive. • Access to Primary Health Care Clinics and Occupational Health Centres providing voluntary, confidential counselling and testing. • Aggressive treatment of sexually transmitted diseases, which in turn reduce the risk of HIV infection. • Prophylaxis and treatment of opportunistic infections related to HIV/AIDS. • Access to Antiretroviral therapy to help employees with HIV/AIDS to stay healthy and productive. 17.4 Terminal Benefits The total terminal benefits liability (TBL) for Rustenburg Operations has been determined by consideration of various employee requirements of the LoM profile. This number has been estimated at ZAR 993million and incorporated in the respective final years of the various shafts comprising the LoM plan.
181 17.5 Environmental Studies 17.5.1 Introduction Anglo American Platinum (AAP) sold their Mines and Concentrators at the Rustenburg Section to SIBANYE RUSTENBURG PLATINUM MINES LIMITED (NW30/5/1/2/2/82 MR) (SRPM). The sale agreement included 82 MR. In order to facilitate the sale agreement, an EMPr consolidation process was undertaken to consolidate all EMPr amendments/addendums into the original 1996 EMPr. The DMRE approved the consolidated document on the 23rd of August 2016. As part of an MPRDA Section 11 ceding process 82 MR and the consolidated EMPr commitments were transferred to SRPM. The DMRE requested the consolidated AAP EMPr be updated to make reference to SRPM as the on-going applicant. The 2016 EMPr is current and represents the alignment to SRPM and will form the overarching environmental authorisation for SRPM Mines and Concentrators at Rustenburg Section. As part of the Sibanye-Stillwater Integrated Compliance, Governance and Risk (ICGR) framework, the Company has embedded a process for improved regulatory risk profile and action plans to address any gaps in the identification of risk, level of adequacy and effectiveness of control measures. This has provided the Environmental and other Departments, e.g. the ESG Department with a much clearer picture of all the legal requirements, its risk exposure and what mitigatory actions (compliance risk management plans) need to be put in place to improve and ensure compliance. The following generic environmental risks have been identified and are applicable to the Rustenburg: Operations: • Third party liability claims as a result of uncontrolled grazing on mine-owned properties. • Non-compliance with applicable environmental legislation. • Uncertainty on the quantum of closure liability for SRPM Operations, pending the proposed amended 2015 Financial Provisioning (FP) Regulations. • Ageing infrastructure and its contribution towards legal non-compliances (environmental). • Increase in illegal activity, sabotage and theft of environmental infrastructure leading to increased frequency and severity of associated environmental non-compliances. • Poor hazardous waste and hydrocarbon management. • Lack of a coherent regional closure strategy, and not being able to clarify SRPM’s role and obligation towards this. • Failure to obtain applicable environmental approvals, timeously as a result of slow responses from Regulators in respect of approving licences and amendments. • Undue reliance on water board/municipal water (with a resultant increase in water costs). • Impacts of water constraints on the production profile of SRPM. • Climate change and global warming. In addition, and from an Environmental, Social and Governance (ESG) perspective, the following key environmental and social legislation, and its associated subsequent amendments, was identified to be applicable, wholly or partially, to the Rustenburg Operations: • Constitution of the RSA, 1996. • The Companies Act, Act 71 of 2008. 182 • King IV Report on Corporate Governance for South Africa 2016 (Institute of Directors in Southern Africa NPC). • Promotion of Administrative Justice Act, Act 3 of 2000. • Protection of Personal Information Act, Act 4 of 2013. • Minerals & Petroleum Resources Development Act (MPRDA), Act No 28 of 2002 and all its Regulations and subsequent Amendments. • National Environmental Management Act (1998). • National Environmental Management: Biodiversity Act, Act No 10 of 2004. • National Environmental Management: Waste Act, 2008. • National Nuclear Regulatory Act, 1999. • National Environmental Management: Air Quality Act (NEM:AQA), Act No 39 of 2005. • National Water Act (NWA), Act No 36 of 1998. • Water Services Act (NWS), Act 108 of 1997. • Labour Relations Act, Act 66 of 1995. • Mineral and Petroleum Resources Royalty Act 28 of 2008. • Hazardous Substances Act, Act No 15 of 1973. • National Heritage Resources Act (NHRA), Act No 25 of 1999. • National Forest Act, Act No 84 of 1998. • National Road Traffic Act, Act 93 of 1996. • Road Transportation Act, Act 74 of 1977. • Fertilizers, Farm Feeds, Agricultural Remedies and Stock Remedies Act, Act No 36 of 1947. • Conservation of Agricultural Resources Act (CARA), Act No 43 of 1983. • National Veld and Forest Fire Act, Act No 101 of 1998. • National Environmental Management: Protected Areas Act, Act 57 of 2003. • Promotion of Access to Information Act, 2000. • Agricultural Pest Act, Act No 36 of 1983. • Skills Development Act, Act 97 of 1998. • Skills Development Levies Act, Act 9 of 1999. • Broad-Based Black Economic Empowerment Act, Act 53 of 2003 and • Employment Equity Act, Act 47 of 2013. An important change in the regulation of mining related environmental activities was that on 8th December 2014, with the launch of the so-called “One Environmental System” (OES), the Minister and thus the newly renamed DMRE became the Competent Authority for environmental issues within the mining industry. The Minister of Environmental Affairs -Department is now referred to as the Department of Environment, Forestry and Fisheries (DEFF) became the appeal authority for mine environmental issues. Since its inception in 2014, the OES has not as yet fully taken off as not all of the relevant Government Departments/Regulators seem to be on-board with the new, stricter approval timeframes and/or other OES requirements which has led to the implementation of OES being, at best, mediocre and at worst, not meeting applicants’ expectations. In November 2015, new Regulations regarding FP were gazetted, with onerous legal obligations around financial provisioning on several closure-related issues. The mining industry has and is in the process of challenging these proposed FP Regulations, with a view to having the most onerous Regulations excluded from any revised FP Regulations. Sibanye-Stillwater has put forward its own challenges in 183 respect of the proposed amended 2015 FP Regulations, either as an interested and affected party, or as a member of the Minerals Council of South Africa. Stakeholder engagement and consultation on the revised FP Regulations is ongoing, and the new revised compliance date for the amended 2015 FP Regulations has been set as 19 June 2022. 17.5.2 Baseline Studies 2021 17.5.2.1 History The Rustenburg Operations began before the current Regulations were in place. Baseline Studies refer to more recent information (last 20 years) and the 2016 EMPr. No impact assessment was undertaken during the compilation of the 2016 report. The Original 1996 EMPr and associated Amendments/Addendums are existing authorisations. Each EMPr Amendment/Addendum process was accompanied by an impact assessment during the compilation of each (commencement year of each varies). The following were considered in the baseline studies (Table 72). Table 72: Baseline Studies Description of the Baseline Environment Geology SA Bushveld Complex and PGM Deposit description Topography General Topographic features Climate Climatic Zone, temperature, Rainfall and wind Soil, Land Use and Land Capability Soil types, Erosion potential of soils, Land use and Capability Hydrology Water management area, Wetlands, Surface water hydrology and water quality, Resource class and river health Geohydrology Aquifer characterisation, Groundwater quality, Hydrocensus Biodiversity Flora, Terrestrial Fauna, Aquatic Fauna, Current Status Air Quality Ambient air quality characterisation Vibration and Noise Comprehensive blasting assessment, A baseline noise survey was undertaken by dBAcoustics as part of the Ventilation Shafts project Archaeology and Cultural Heritage Archaeological and cultural sites assessment 2005 Visual Landscapes Visual character and quality, Sense of Place Socio-Economic Provincial and district overview Land use 17.5.3 Zone of Influence 17.5.3.1 Studies and Methodologies The Zone of Influence of a project (Rustenburg as a whole) is defined as the area within which it has or can have material impacts or can influence impacts due to the establishment and continuation of the project’s activities, products or services. The Zone of Influence is unique to each project and each aspect thereof, is larger than the actual project footprint and can either be positive or negative. 184 The Zone of Influence is determined by evaluating and mapping the following environmental and social components of the project: • Footprint and areas directly adjacent to the infrastructure erected for the project • The areas affected due to the following definition: o Secondary impacts arise from other impacts that are directly due to the development. o Induced impacts are due to unplanned/unintended/secondary activities that are ‘catalysed’ by the project. o Cumulative impacts are results of numerous individual activities, which might not be material on their own, but which can interact or combine to cause material impacts. • These areas can typically be impacted by surface and groundwater abstraction, surface and groundwater usage or discharges, seismicity, air quality, noise, visual and soil impacts, as well as invader vegetation infestation, protected areas destruction, loss of important biodiversity areas, and any other material impacts that may be identified during the Zone of Influence determination • Areas that will be deriving economic benefits from the project like adjacent towns and communities, as well as labour-sending areas and • Surrounding environmental areas that can benefit or be impacted upon by the project. For each environmental aspect, the Zone of Influence is determined independently and displayed on a map. A composite Zone of Influence for the entire project is then eventually determined. For its major environmental aspects (e.g., water discharges and air emissions) and resulting material impacts Rustenburg has extended monitoring programs and management systems in place to ascertain its impact on the environmental and surrounding communities and therefore has a very good understanding of its material impacts on the above-mentioned areas. Management systems and procedures are in place to deal with those identified material impacts. Specialist studies required by environmental authorisations and Environmental Impact Assessments (EIA’s) are further valuable sources of information to determine those areas potentially impacted upon by the project. Future specialist studies should include an update or revision of the Zone of Influence map for each aspect and material impact as well as a combined Zone of Influence per aspect. These are updated at varying frequencies as informed by specialist studies. The determination and display of a composite Zone of Influence that includes environmental, social and economic issues is a complex matter and has not been yet attempted by Rustenburg yet. Current Zone of Influences are provided only for surface water resources as described in the Water Strategy Section of this report. The Rustenburg Operations have not determined the composite Zone of Influence (due to its complexity for a large-scale mining operation), but individual specialist zone of influences have been compiled as part of environmental risk management. Examples: noise, visual, air, surface and groundwater.
185 An attempt will be made in 2022/2023 to determine, map and collate a composite Zone of Influence for Rustenburg that may or may not also include the social Zone of Influence. However it will first be required that the individual specialist studies be updated, these commenced in 2021 and are planned to be completed in 2022. 17.5.3.2 Groundwater The groundwater Zone of Influence represents the following two scenarios: • Secondary Impacts: These are currently defined by the pollution plumes emanating from waste storage facilities, namely the TSFs and Surface Rock Dumps (SRDs); and • Induced and Cumulative Impacts: These are presented by the dewatered areas to allow for mining. A comprehensive update of the groundwater specialist studies was undertaken in 2021 and will be completed in 2022, this will be incorporated into the 2023 TRS. The current groundwater data indicates that the zone of influence from a water quality perspective is largely limited to the source (boreholes located at the TSFs, dirty water dams and waste rock dumps) and plume boreholes (boreholes located within the expected plumes of the TSFs, dirty water dams and waste rock dumps). No dewatering impacts are expected or are highly localised to the shaft areas. Impacts from groundwater contamination may however occur on the adjacent Hex River, Klipfonteinspruit, Klipgatspruit, Paardekraalspruit and a tributary of the Sterkstroom due to the location of the contamination sources within the buffer area, and in some case historical areas of the wetlands. These impacts occur as a result of ground-surface water interactions. Refer to the Surface Water discussion for further information. 17.5.3.3 Surface Water The surface water Zone of Influence is made up of areas influenced by secondary, induced and cumulative impacts. However, the assessment of cumulative and induced impacts still requires further investigation as these impacts may be far-reaching and they become less apparent due the activities of others in the catchment. Alternatively, they may only become apparent in the future dependent on the environmental context, such as the climatic conditions. The Zone of Influence’s represented below consider the secondary impacts that have been evaluated as associated with the current operational area of the mine. Secondary Zone of Influence The watercourses within this section of the Zone of Influence represent activities within the wetlands, drainage lines, rivers and the recommended buffer areas that have the potential or have already caused a change to the ecological function and service provision of the wetlands. An updated and detailed wetland delineation is being undertaken to ascertain an improved zone of influence. Induced and Cumulative Impacts Zone of Influence The Zone of Influence for the induced and cumulative impacts has been determined based on the compliance of the water quality of the surface water bodies. The end of the impact is considered to be 186 the point at which 95% compliance to the Resource Water Quality Objectives (RWQO) has been achieved for the year to date. The use of water quality as a means of determining compliance implies that all potential impacts whether from direct discharges, diffuse seepage and/or groundwater interflows would be assessed against the current applicable standards. The zone of influence is provided in Figure 71 for RPM. The RPM operations are primarily located within the Hex River and its tributaries (Dorpspruit, Klipfonteinspruit, Klipgatspruit and Paardekraalspruit). The Hoedspruit TSF however is associated with the Sterkstroom due to its location within a wetland tributary of the Sterkstroom. The Sterkstroom and Hex River have respective RWQOs. Both systems are influenced by a combination of land and water users and water quality is not solely influenced by the RPM operations, though it does make-up a large portion in the Hex River. The Rustenburg operations also impact on the Sterkstroom. Both downstream endpoints within the Hex River do not satisfy the zone of influence requirements of 95% compliance to the RWQOs, showing less than 50% compliance in 2021 (K118: 47%; K081: 46%). It is notable that the limits are very stringent and considering the intense utilization of the catchment for a diverse mix of land-uses, it is unlikely the catchment can conform to the RWQOs. Sibanye-Stillwater continuously engage the Department of Water and Sanitation in to arrive at realistic, science-and-risk based limits both in the water use licences and the RWQOs. Nevertheless, RPM are implementing several mitigation and restoration measures, including joint task teams with other water users, in order to improve the water quality within the catchment. The impacts expected from the qualities observed will result in eutrophication, salinization and potential toxicity due to exceedances of chronic effect values occasionally for chlorides and acute effect values in terms of ammonia. Sewage inputs are frequently reported from non-mining sources and contribute to the nutrient enrichment. A point further downstream was not selected as the catchment thereafter reaches a confluence with other streams and further water quality impacts. The Sterkstroom shows improved compliance as compared to the Hex River, likely a function of a reduction in the land and water use activities within the catchment. The points directly downstream of the Hoedspruit TSF show 68% (KM S 08) and 67% (KM S 32) compliance. Further downstream this improves to 75% at WP S 21. Mitigation and maintenance measures have been identified as associated with the Hoedspruit TSF to address any potential contributions to the water quality issues from the facility. Eutrophication and toxicity impacts associated with the ammonia content may be expected, however biomonitoring results show the sites associated with KM S 08 are in a moderately modified to near natural state in 2021 (discussed in more detail in the Sibanye-Stillwater Integrated Annual Report Biodiversity Fact Sheet). 187 Figure 71: RPM Surface Water Drainage and Monitoring Points 17.5.3.4 Visual Zone of Influence A Visual Zone of Influence for the Rustenburg Operations has not as yet been developed and will be developed in 2021/2022 given budgetary and time constraints. 17.5.3.5 Noise Zone of Influence A Noise Zone of Influence for the Rustenburg Operations has not as yet been developed and will be developed in 2022. 17.5.4 Climate Change and Greenhouse Gas Emissions, Air Quality Sibanye-Stillwater considers climate change one of the most pressing global environmental challenges of our time. Sibanye-Stillwater recognises the importance of proactively managing its carbon footprint in the global context and is committed to contributing to a global solution through the deployment of responsible strategies and actions. To this effect, Sibanye-Stillwater monitors and reports on its carbon emissions (Table 73). Sibanye uses the Department of Environment Forestry and Fisheries’ Technical Guidelines for monitoring, reporting and verification of greenhouse gas emissions by industry (Version No. TG-2016.1 of April 2017) and the World Resources Institute: Greenhouse Gas Protocol for determining its carbon inventory. Furthermore, Sibanye-Stillwater is committed to contributing to a global solution by deploying responsible strategies and actions in the areas within which the mines operate: 188 • Develop and implement an energy and decarbonisation strategy. • Drive and achieve a carbon-neutral position by 2040. • Drive an absolute reduction of Scope 1, 2 and 3 Greenhouse Gas Emissions (GHG) emissions to achieve a science-based target (Science Based Target Initiative (SBTi) approved) that is required to keep global temperature increases below 2°C compared to pre-industrial temperatures. • Drive and implement initiatives and programmes to assess and understand GHG emissions profile and carbon footprint in order to optimally reduce the mine’s carbon footprint. • Formulate a position on and investigate the feasibility of carbon offsets in line with legislation and other principles that can be used to offset carbon emissions and that has the potential to offset the financial liability imposed by a carbon tax in specific jurisdictions. • Promote awareness and drive initiatives to combat the impact of global warming and climate change. • Deploy effective climate risk management strategies, taking into consideration ESG risks and stakeholder perceptions of risks. • Adhere to the requirements as set out in Sibanye-Stillwater’s policies, position statements and procedures. Table 73: Rustenburg tCO2e Emissions Inventory 2021 Scope of emissions Emissions (tonnes carbon dioxide equivalent – tCO2e) Scope 1: Emissions from direct fuel sources such as petrol and diesel 25,946 Scope 2: Emissions from purchased electricity 315,006 Scope 3: Emissions from other indirect sources such as purchased goods and services 345,104 The South African Government has set out the country’s nationally determined contributions to follow a peak-plateau-decline trajectory, where greenhouse gas emissions peak in 2020 to 2025, plateau for a ten-year period from 2025 to 2035, and decline from 2036 onwards. Notwithstanding this, Sibanye-Stillwater strives to reduce its carbon emissions year-on-year. This is in support of the Intergovernmental Panel on Climate Change prediction that emissions in 2050 need to decrease from 49% to 72% relative to 2010 levels to limit the global average temperature increase to within 2°C. Sibanye-Stillwater set a target in accordance with science-based methodology to reduce its carbon emissions by 27% from its 2010 base year by 2025. A base year is a reference point in the past with which current emissions can be compared. In order to maintain the consistency between data sets, base year emissions need to be recalculated when structural changes occur in the company that change the inventory boundary (such as acquisitions or divestments). Carbon Project The Afrigle System has been implemented at all the shafts in the Rustenburg Operations. The project entails a fuel management system (FMS), installed at all shaft filling stations.
189 The system provides accurate, automatic, electronic records and real-time reporting of fuel usage and eliminates driver intervention, data manipulation, unauthorised refuelling, possible theft and human error, enabling each shaft to understand their usage and better control fuel consumption and their resulting emissions. 17.5.5 Biodiversity Management Since Sibanye-Stillwater took ownership of the Operations, there were no major infrastructure expansions that would have resulted in the loss of key biodiversity areas. Nevertheless, biodiversity management continues in terms of the following initiatives: • Update of Biodiversity Management and Action Plans associated specialist studies with specific focus on alien and invasive plant management; • Wetland delineations and health assessments, including impact assessments where new projects or project changes are planned to occur; • Surface water monitoring in terms quality, quantity and biological taxa composition; and • For any new projects, the Environmental Impact Assessment and Basic Assessment processes are also implemented which incorporate the identification of important biodiversity areas such as wetlands, cave systems and ridges. South African Non-Profit Organisation, the Endangered Wildlife Trust (EWT), has taken the lead in South Africa in developing an international voluntary reporting mechanism, called the Biodiversity Disclosure Project, similar in approach to the Carbon Disclosure Project. Sibanye-Stillwater contributed to the final document, the Biological Diversity Protocol (BDP), and will be aiming to align with the reporting requirements in 2021. and has completed its first assessment of the BDP for its operations and will be reporting on this in the 2021 Annual Integrated Report. The assessment includes hectare equivalency accounts for ecosystems and plots the planned changes over time in order to inform management and mitigation measures to achieve our target of a net gain in biodiversity as based on the ecosystem state at the date at which Sibanye-Stillwater took ownership of Kroondal. The assessment currently focusses on ecosystems and new mechanisms will be investigated in order to effectively assess species population data in a meaningful manner as current assessment measures are considered to be unviable (due to large areas and security considerations) and arbitrary (due to challenges in seasonality, specialist availability and geographical extent). Sibanye-Stillwater developed its first Biological Diversity Procedure that embeds the mitigation hierarchy into all decision-making processes from feasibility to post-mining. It ensures the use of the best practice local science-based methods for monitoring and assessment, the outcomes thereof are then incorporated into option analyses along with consideration of health, safety, engineering, social and economic considerations to arrive at the best practicable and sustainable way forward. Ultimately it aims to enhance avoidance of impacts on sensitive ecosystems and thereafter integrate mitigation, restoration and off-setting to achieve our net gain and no net loss targets as applicable to the sites. Managed by the EWT, the BDP will build the capacity of businesses to manage their biodiversity risks and opportunities and enable them to disclose their biodiversity performance in a standardised and comparable manner. 190 17.5.6 Water Use Strategy Rustenburg Operations are dependent on water to sustain operations. The operations receive water from the following water sources: • Excess underground fissure water, • Potable water purchased from the Rand Water Board and Municipal distribution networks and • Greywater purchased from the Rustenburg Water Service Trust (RWST) in terms of an agreement with Anglo-American Platinum. The context summary of water use at the Rustenburg operations for 2021 is presented in Figure 72. The Rustenburg operations abstracted on average 24.81 Ml/day to process 33,023 tonnes per day. 67% of this was purchased from the Rustenburg Local Municipality, Rustenburg Water Service Trust, and Rand Water Board which supplied mainly from the Vaal River System (VRS). A small portion of the purchased water is supplied from Vaalkop system which forms part of the Crocodile catchment. Figure 72: Rustenburg Water Use Summary 17.5.6.1 Licensing The SRPM WUL, Licence No. 07/A21D/AIJGC/7026 File no 116/2/7/A210/C5 was consolidated with the Bathopele WUL, Licence No. 03/A22H/CI/3706 File no. 16/2/7/A220/C5/C1 that was received on 22 April 2016. The consolidated SRPM WUL, Licence no. 07/A21D/AIJGC/7026 File no. 16/2/7/A210/C5 was received 16 January 2018. The Water Use Licence for SRPM, Licence No. 07/A21D/AIJGC/7026 File no. 16/2/7/A210/C5 requires SRPM to annually update the site’s Integrated Water and Waste Management Plan (IWWMP) and Rehabilitation Strategy and implementation Programme (RSIP) in terms of Condition 12.2 of Appendix V of the WUL. Regular detailed reviews of the WUL are conducted to ensure that the WUL fits the operational requirements. 191 17.5.6.2 Geohydrological Analysis and Pumping The mafic intrusive norite that outcrops over most of the Rustenburg operations is characterised by weathering in the first few meters from surface – usually between zero and 20m deep. Extensive mapping and related geological field work indicate that weathering follows a broad pattern due to regional stresses and deformation with weathered basins mostly orientated in north-west by south-east trending ‘valleys’. The more permeable weathered areas form elongated basins of weathering with un-weathered ridges in between, meaning that preferred flow paths are seldom very long (few tens of meters) in extent. Where no weathering and associated fractures/fissures occur, the norite rock matrix is virtually impervious for groundwater flow. Groundwater flow and mass transport is thus directly dependent on geological structures (open fractures/fissures/joints) and weathering of the mafic intrusive rocks. Although flow and mass transport can be significant within a significantly weathered area, the areas are confined by unweathered, low permeability zones which act as natural containment features. For this reason relatively small volumes of water reports to underground operations through fissures and pumping systems are mainly purposed to recirculate water for production purposes. The systems are adequate to prevent operations from flooding during periods where higher water ingress is experienced and well maintained in accordance with a planned maintenance programme. 17.5.6.3 Discharge All water on the mining operations is kept in a closed water reticulation and therefore no discharges are experienced under normal conditions. Sporadic overtopping of process dams is managed to a minimum to optimise water use and mitigate or eliminate pollution because of polluted water. 17.5.6.4 Usage and Storage The water distribution diagram of the Rustenburg – Kroondal Complex is presented in Figure. There are currently six active WWTW facilities namely the Khuseleka and Municipal WWTW situated in the Paardekraal Complex, the K5 WWTW situated in the Kroondal West Complex, the Waterval WWTW in the Waterval Village area of the Paardekraal Complex and the K1 and K2 WWTW facilities situated in the Kroondal East Complex. Eight active Tailings Storage Facilities (TSFs) receive tailings deposits from the various concentrator plants. Three of these TSFs (PK Central, PK 4 and PK 5) are located in the Paardekraal Complex, three (K1, K150 and K2) are located in the Kroondal East Complex, one (Hoedspruit) in the WLTR Klipfontein Complex section and one (Marikana) in the Klein Marikana Complex. Waterval West and East Tailings Dams in the Paardekraal Complex are not active and only receive rainfall runoff. The Klipfontein Tailings Dam in the WLTR Klipfontein Complex is re-mined and receives recovered tailings from the Waterval East e-feed transported with trucks to the Klipfontein Tailings Dam from where the slurry is pumped to the WLTR Concentrator. Potable water is supplied to various villages and hostels located in the Rustenburg - Kroondal Complex. 192 17.5.6.5 Water Conservation and Water Demand Management Sibanye-Stillwater listed the following strategic objectives as Water Conservation and Water Demand Management focus areas: Objective 1: Demonstrating thought leadership in WCWDM practices; Our WCWDM plan presents a strategy and specific initiatives that aims to drive industry leading performance when it comes to responsible water management practices. Our aim is to align our strategy and initiatives to regional, national and global strategies, where each initiative is implemented after thoroughly considering and aligning to all relevant social, environmental and governance requirements. Objective 2: Drive business sustainability through ensuring availability of water to support safe and productive operations – water security and water independence; Objective 3: Minimise the impact of our operations on water resources; • Achieve this through: • Responsible and efficient use of water; • Minimise uncontrolled and unlicensed discharge of water; and • Minimise pollution of water. Our plan is to improve the recovery of water from large facilities such as Tailings Storage Facilities (TSF’s) and rock dumps. It also consists of monitoring regimes used to identify and minimise water leakages and excessive use. We drive initiatives required to improve water storage and the control of process dams for each operation. Water polluted with fuels, oils, greases, heavy metals, salts and other possible pollutants are not fit for operational or potable use. It is not permitted to discharge water polluted beyond specified limits. Therefor pollution must be kept to a minimum. Our strategy aims to optimise the re-cycling of effluent water. Objective 4: Drive business sustainability through continuous improvement, effective governance and meaningful stakeholder engagement to promote WCWDM; Each initiative in the WCWDM plan carefully considers business sustainability, such as risk and cost, and is evaluated, designed and implemented within defined governance framework and procedures. A comprehensive Legislated Environmental Activity Procedure (LEAP) ensures that affected stakeholders are consulted and considered in the implementation of projects. The aim of Sibanye-Stillwater is to embed a culture of responsible water use among our employees and stakeholders. Objective 5: Drive sustainable mine closure strategies Given the priority of sustainable post mining economies, the management of water resources to benefit the region post-closure is important. Our aim is to implement closure strategies that considers the opportunities and risks associated with water resources available for future communities and economies.
193 Figure 73: The Schematic Process Flow Diagram for Water Handling at the Rustenburg Operations 194 17.5.7 Waste Management The RPM Operations waste management procedures follow the standards procedures outlined for the SA PGM operations. Tailings Storage Facilities are described in the Tailings Section 15.2 COVID-19 wastes are handled according to special protocols and are not covered by the general Wastes Management protocols. All non-mineral wastes are covered by the Environmental PGM Operating Procedure – Waste Management. These wastes include various solid and liquid wastes, medical, chemical and other hazardous wastes. This procedure outlines the applicable legislation and required authorizations, storage and handling procedures, and lines of responsibility for mine residues and non-mineral wastes as classified in the 2015 study by En-Chem Consultants (Baldwin 2015 ). Sibanye-Stillwater's strategic stance on waste and waste management is articulated in its Waste Position Statement, approved and published in June 2021. In this Position Statement, our Zero Waste-to-Landfill long-term objective is well articulated, as well as important waste reduction approaches such as Waste Management Hierarchy, the circular economy (in which waste could play a leading role) as well as waste minimisation. Accurate and timeous waste data reporting as well as the setting of relevant and appropriate waste reduction targets, are some of the deliverables for 2022. 17.5.8 Environmental Reporting 17.5.8.1 Audits In order to ensure continued compliance to the various licences in place for the Rustenburg Operation numerous audits are performed on varying timelines, based on the regulatory, as well as practical management requirements associated with the relevant authorisation. The environmental monitoring reporting requirements and audit frequencies are summarised are summarised in Table 74 below. Table 74: Environmental Monitoring and Reporting Periods Authorisation Frequency of audit Environmental Audit of the Rustenburg EMPR Biennial Internal Audit of the Rustenburg Water Use Licence Annual External Audit of the Rustenburg Water Use Licence Annual The auditing process is made up of the following basic steps: • Define audit requirements including scope of audit, implementation deadlines and extent of audit to be performed. 195 • A review of the authorisation in question is performed and a list of required information as well as sites to be visited is compiled. • The list is provided to all parties who are responsible for the various aspects of the authorisation who are given the opportunity to prepare the submissions. Typically, a discussion is held between the auditor and the responsible persons to ensure the requirements are clearly understood by all parties. • A site inspection is conducted for the areas relevant to the authorisation to be audited. • The auditor prepares findings based on the submissions made and the site inspection. Typically the findings are classified into compliant, partially compliant and non-compliant. The total compliance percentage is made up of only of compliant category. For items that are considered partially or non-compliant further recommendations for improvement are provided. • The findings and recommendations for improvement are provided to the relevant responsible persons for review in order to ensure all results are accurate and the recommendations for improvement are realistic. • The final report is signed-off and submitted to the relevant regulatory authority for their consideration. Simultaneously the action plans based on the recommendations are drafted and executed. A summary of past environmental compliance audits is presented in Table 75. Audits were conducted by Environmental Legal Services and an independent external auditor. Table 75: Summary of the Audits for Rustenburg Authorisation Date completed Name of auditor Qualification of auditors Rustenburg EMPR December 2021 Anneline Dreyer • Environmental Lawyer and qualified Legal Auditor. B.Proc • Legal advisor by Government with experience in the drafting, updating and interpretation of legislation, prior to joining SABS. • Involved in the establishment of the international ISO 14001 standard in South Africa on behalf of the SABS, 1996. • Appointed as the first environmental legal auditor to the SABS’s certification body for a period of 3 years. • Private practice as a legal advisor since 1999. • Undertaken intensive legal compliance audits within the industry and mining sectors alike including the auditing of environmental authorisations (EA’s), Integrated Water Use Licences, Waste Management Licences as well as performance assessments on approved EMPr’s. She has developed and presented in-house legal courses, as well as drafted numerous legal opinions on the implications and interpretation of Legislation. • Over 15 years of experience. Rustenburg Water Use Licence December 2021 Ruan Dreyer • B.Sc. Environmental and Biological Sciences (Geology) from the University of the North West (Potchefstroom) • B.Sc. Honours: Environmental Management from the University of South Africa (UNISA). • SAMTRAC course at NOSA • ISO 14001:2004 Understanding and Implementation course • ISO 14001:2004 Lead Auditors course, SABS 196 Authorisation Date completed Name of auditor Qualification of auditors • IRCA accredited ISO 14001:2015 Lead auditors course, BSI • ISO 14001:2015 Understanding and Implementation course at the SABS • ISO 9001:2015 requirements course at BSI • Waste Management course at Interwaste, Hazard Identification and Risk Assessment course at HASLAC • Over 10 years’ experience in environmental management and Auditing and specializes in Environmental Audits, Waste Management Licence audits, Water Use Licence audits, Waste Assessments and classifications, Environmental Legal Gap analysis’s, compliance monitoring to Environmental Authorisations (ROD’s) issued in terms of the National Environmental Management Act, EMPr (Mining) Compliance Auditing and implementation of SHE management systems at Diamond Mines, Coal Mines, Gold Mines, Platinum Mines, Limestone Mines, Chemical Industry, Computer Manufacturing Industry, Railway Industry, Bearing Manufacturing Industry, Glass Manufacturing Industry, Construction Industry and Clutch Manufacturing Industry 17.5.8.2 Findings Findings are discussed in terms of overall compliance with the legislation that pertains to the environment and community. Refer to Table 76 for further details. Sibanye confirms that, as far as is practicable, the Rustenburg Operations is aware of, and compliant with the legal and other requirements that are applicable to its mining operations. Table 76: Rustenburg Compliance to Legislation Authorisation/Approvals Legislation Date of Issue & Current Status Converted Mining Right(s) MPRDA February 2007 Environmental Management Programmes (EMPR’s) EMPR Amendment report MPRDA/NEMA Amendment EMPR for RPM was submitted to the DMR in February 2018. Water Permit 1956 Water Act Not applicable Water Use Licences (WULs) RPM WUL NWA 2018 16/01/2018 Atmospheric Emissions Licences (AELs) NEM:AQA Not applicable Waste Management Licences (WMLs) NEM:WMA 2014/03/02 will lapse as norms and standards will be applicable. Application for norms and standards for sorting of waste was submitted in 2021.
197 Authorisation/Approvals Legislation Date of Issue & Current Status NEMA Environmental Authorisations (where applicable) NEMA Not applicable The following material risks and action plans (Table 77) have been identified from the 2021 audits conducted for the Operation: Table 77: Material Risks and Action Plan Audit Overall Compliance Finding / Risk Action plan Environmental Audit of the SRPM EMPR 93% High priority conservation areas are required to be identified with the community and fenced off to protect biodiversity. This is not done and will not be done. This commitment will be amended as fencing is not practical nor is it socially acceptable not to allow communities to enjoy the biodiversity areas. High priority (sensitive) areas will be identified through the Specialist Delineation Study that has been planned Topsoil was not previously stripped and stockpiled as was required by the EMPr. Therefore, there are many topsoil and rehabilitation commitments in the EMPr that the mine does not comply to, currently. There are also several contradictory EMPr commitments and inconsistent requirements. Amendment of EMPr to ensure uniform management and mitigation measures are provided for topsoil stripping, stockpiling, storing, protection and re-use. EMPr will also be amended for these commitments to refer to “alternative growth medium”, as opposed to topsoil (in light of the insufficient topsoil available). Identification of alternative growth medium is still required. Areas of soil contamination, resultant from affected water overflow, dust deposition, spillage of tailings and hydrocarbons etc. Ongoing implementation of GN704 recommendations and additional phases of the Dust Management Plan will reduce the area and frequency of potential soil contamination. Continue with the soil monitoring programme, which is there to investigate possible soil contamination and determine the pollution / contamination risk, which is currently not posing an environmental or health risk. Ad-hoc exceedance of dust deposition thresholds and no PM10 monitoring currently in place. There is also no Air Quality Management Plan, although there is a comprehensive dust monitoring programme in place. Develop an Air Quality Management Plan. Commence with PM10 monitoring and improve on dust control measures implemented at the high-risk areas by continued implementation of the Dust Management Plan The rehabilitation commitment in the EMPr is not aligned to the Sibanye-Stillwater The rehab commitments are required to be amended to clarify that concurrent 198 It is important to note that Rustenburg is an established mining operation that has been in operation in excess of 20 years. As such, while permits and other approvals are in place for the operational phase of the mine, there are no new exploration activities, and thus some of the above requirements may not be applicable to it. In line with the requirements of the ISO 14001: 2015 environmental management system (EMS) standard, SRPM now implements and maintains a comprehensive Legal Register, as well as conducting legal compliance audits at pre-determined intervals. The findings and results of these legal compliance audits will hence be reflected under this section. rehabilitation protocol, resulting in non- compliance to several rehabilitation-related EMPr commitments rehabilitation does not take place in all available areas, but rather is aligned to the areas identified in the Footprint Reduction Protocol/Program (FRP). Not all the annual rehab targets as per the latest Annual Rehabilitation Plans have been reached. The FRP has been finalised and started, which will allow the mine to reach their rehabilitation objectives. External Audit of the SRPM Water Use Licence 92% Annual volume of fissure water abstracted from Thembelani 1, Bathopele and Siphumelele 1 Shafts, exceed the volume authorised in the WUL Amendment to the abstraction volume limits in the Rustenburg WUL has already been applied for from DWS Unauthorised water uses, namely 21(c&i)’s (two roads crossing the Klipgatspruit) and 21(g)’s (Paardekraal Pase 4 SWD, Hoedspruit TSF SWD, three refrigeration ponds). Amendment to SRPM WUL to include the unauthorised water uses has already been submitted to DWS. Construction activities within 100 m of a watercourse (namely building rubble dumped within the riparian zone and construction of additional channel around Paardekraal TSF to contain seepage). Remove the building rubble dumped in the riparian zone. Apply for GN704 exemption for the additional seepage collection channel. Hoedspruit Diversion damaged during heavy rainfall, resulting in erosion. Repair damage to the diversion and stabilise the embankments. Inadequate maintenance of storm water control infrastructure: capacity of several pollution control dams affected due to lack of ongoing maintenance. Several storm water channels partially blocked with silt and debris. Undertake updated GN704 audit (which has been budgeted for 2022) and implement the recommended actions from the specialist study. Implementation will be ongoing and over a period of years, depending on total cost of construction required. Maintenance of stormwater channels should be included as a job card in PRAGMA Mining impacts relative to groundwater quality limits stipulated in the WUL. Mine Closure Water Studies are currently underway. Phase 1 of the Geohydrological gap analysis assessed the current understanding of the groundwater regime and identified gaps. Phase 2 will consist of detailed studies to address the gaps and update the groundwater monitoring network based on the results of the numerical model to optimise rehab measures. 199 The current approach in terms of legal compliance is embedded in the Company’s Compliance & Risk Management (CRMP) processes, managed by a dedicated Compliance Department. The results from the most recent compliance risk profiling session (completed at the company level for FY2019) indicate that the Risk Exposure Values (REVs) for the Company as a whole are higher than the “High-Risk Exposure Threshold” in five of the 23 identified environmental laws/corporate commitments. Particular attention is therefore paid to these aspects through action plans and mitigation measures that would reduce the risk exposure in these areas. As far as is known, there have not been any claims (exceeding over ZAR 1 million) for the Rustenburg Operations. 17.5.8.3 Future Actions Table 78 shows the future actions and projects for the Kroondal Operations. Table 78: Future Actions Project Description Due Date Status Hydrogeological Assessments March 2022 Complete Wetland delineation studies November 2022 In Progress Desilting of UG2 Concentrator storm water dam in order to maintain compliance to GNR704 December 2021 Complete Desilting of the Retrofit silt trap and trenches in order to maintain compliance to GNR704. December 2021 Complete Desilting of Western Limb Tailings Treatment Plant storm water dams in order to maintain compliance to GNR704. December 2021 Complete Implementation of 5-year dust management plan for Paardekraal Tailings Dam Project Commenced in October 2020. • Year 1 – Complete 2020/2021 • Year 2 – 2022 • Year 3 – 2023 • Year 4 – 2024 • Year 5 – 2025 In Progress Drilling of scavenger wells for management of ground water contamination and use of water within the operations to supplement purchased potable water. November 2023 In Progress Tailings Dam Break Analysis Assessments in order to comply with GISTM Standard Requirements August 2023 In Progress Implementation of K2Fly in order to gather environmental and data to support compliance to the GISTM Standard Requirements August 2023 In Progress EMPR Amendment November 2022 In Progress Water Use Licence amendment December 2023 In Progress 200 17.5.9 Closure Planning and Costs The implementation of, and adherence to these ESG standards and principles, in addition to the various Position Statements developed, will form an integral part of Sibanye-Stillwater’s Environmental Strategy in 2021 and beyond. The Operations are committed to on-going closure planning. Scheduled and unscheduled mine closure costs are reviewed and updated annually for financial reporting and regulatory compliance. The National Environmental Management Act (NEMA), pertains to the financial provision for prospecting, exploration and mining and requires that a final rehabilitation, decommission and mine closure plan is developed which includes the determination of financial provision to guarantee the availability of sufficient funds to undertake rehabilitation and remediation of the adverse environmental impacts of mining. An amendment to GNR 1147 ( Regulations for Financial Provision for Prospecting, Exploration, Mining and Production Operations,2015) in October 2016, extended the Transitional Arrangements to February 2019 (which was subsequently further extended to February 2020 and again to June 2022). The alignment of these plans and documents to the 2015 FP Regulations is ongoing. Compliance with the Financial Provisioning Regulations is required within three months from the first financial year-end following June 2022, which is the new promulgated compliance date for the amended FP Regulations. Therefore Sibanye-Stillwater Marikana Operations is required to be compliant by 2023. In order to ensure that all aspects potentially applicable during the closing of a facility is considered during the quantum assessment, a standard checklist have been provided by the guidelines which was used in compilation of this plan. It is however recognized that all the items will not always be applicable for all the areas, but it was considered in any event to make sure that all possible issues were addressed and assessed. Closure Components to be considered during the Quantum Assessment are given in Table 79. In addition, Long Term Care and Maintenance plans as well as Future Monitoring programmes will be established as part of the Closure Plans. Table 79: Closure Components Component No. Description 1 Infrastructural Areas 1.1 Dismantling of processing plant and related structures (including overland conveyers and powerlines) 1.2 Demolition of steel buildings and structures 1.3 Demolition of other buildings and structures 1.4 Rehabilitation of roads and paved surfaces 1.5 Demolition and rehabilitation of railway lines 1.6 Other linear infrastructure 1.7 Disposal of demolition waste
201 Component No. Description 1.8 Making good of infrastructure 2 Mining Areas 2.1 Opencast rehabilitation, including final voids and ramps 2.2. Sealing of shafts, audits and inclines 2.3 Rehabilitation of stockpiles and processing residues 2.4 Rehabilitation of clean water impoundments 2.5 Rehabilitation of dirty water impoundments 3 General surface rehabilitation 3.1 Infrastructural areas 3.2 Other surface disturbances 4 Runoff Management r 4.1 River diversions and watercourse reinstatement 4.2 Reinstatement of drainage lines 5 P&Gs, Contingencies and additional allowances 6 Pre-site relinquishment monitoring and aftercare 17.5.9.1 Life of Mine Planning and closure Given the long Life of Mine final closure plans have not been fully developed. As Shafts are closed plans are developed near the time of closure depending on the local environmental and community situations. 17.5.9.2 Unscheduled Closure Cost Estimate SRPM total closure liability and associated financial provision is based on unplanned closure, with specific costs allocated to the demolition of mining and associated infrastructure, the rehabilitation of mine-impacted land and post-closure monitoring and maintenance. The mechanisms and methods of the demolition, remediation and rehabilitation processes are described in rehabilitation and final closure plans. However, as far as possible, SRPM will embark on a concurrent rehabilitation programme during the operational phase of the mine. This programme will be completed irrespective of unplanned closure and/or continued operations. A closure cost estimate for an unscheduled closure at the Rustenburg Operations is updated annually, in line with the International Financial Reporting Standards (IFRS) of the International Accounting Standards Board and South African Statements of Generally Accepted Accounting Practice as well as applicable environmental legislation (MPRDA and NEMA) and in accordance with the Draft GN1147. During the 2021 closure costs assessment, an estimate of ZAR 1,218,584,817 has been calculated for unscheduled closure costs for the SRPM Operations, which is made up of the following elements: 202 • Infrastructural and mining aspects – ZAR 1,015,493,251 (83%) • Pre-site Relinquishment Monitoring & Aftercare – ZAR 35,274,626 (3%) • Combined Preliminary & General and Contingencies – ZAR 140,665,761 (12%) • Additional studies & allowances – ZAR 27,151,180 (2%) The closure liability for Rustenburg Operations is provided through a combination of cash in trust and third-party financial guarantees. 17.6 QP Opinion The QP is satisfied that all material issues relating to Environmental, Social and Governance have been considered in Rustenburg’s planning. All relevant issues are being addressed, have plans in place to remedy any deficiencies or have been identified for further consideration. 203 18 Capital and Operating Costs 18.1 Overview The following sections contain summaries of the Capital and Operations cost projections. Projections are compared to the last three years actual figures. Accuracy limits for metal pricing and costs is given in Table 95 in Section 21.1.2. 18.2 Capital Costs Capital expenditure on Table 80 and Table 81 for Rustenburg includes sustaining capital. Ongoing capital expenditure estimates are based on a provision of an approximate 4% of operating cost expenditures for shallow mines, this percentage is based on historical spend, and the current business plan generally are included for the first year of the LoM plan. These amounts cater for expenditures of a capital nature and are considered prudent provisions (contingencies) to maintain the operations infrastructure, given that limited detail is provided beyond the current three-year horizon. 18.3 Operating Costs This section provides details on the forecast operating cost estimates for Rustenburg Operations. 18.3.1 Operating Costs by Activity Table 82 and Table 83 provides details of historical and forecast Operating Costs by activity grouped according to: • Mining costs–underground and surface sources costs, including ore handling costs • Processing costs, including tailings and waste disposal costs and • The cost of maintaining key on mine infrastructure. In addition, Rustenburg has incorporated costs for environmental rehabilitation and closure and costs associated with terminal benefits, which will be payable on cessation of mining activities. No salvage values have been assumed for plants and equipment. The Operating cost are based on the current year’s operational business plan and projected forward using the required production profile taking into account the likely physical changes in the operating parameters over the full period of the LoM plan. 18.3.2 Operating Costs The operating cost for Rustenburg Operations for the Mineral Reserves in the LoM plan is ZAR 1,627/t. The actual operating cost for 2021 was ZAR 957/t for underground and surface combined (Table 82). The five-year forecast average is ZAR 1,111/t. 18.3.3 Surface Sources Costs The Surfaces Sources and purchase of concentrate in the Mineral Resource or LoM plan are included in the total operating cost. 204 18.3.4 Processing Costs The treatment cost for C2022 is estimated at ZAR 235/t milled for both underground and surface material. For LoM, the expected unit costs increase as the production plan decreases. The average over the next five years is ZAR 236/tonne. 18.3.5 Allocated Costs Allocated costs have been forecast at an average of ZAR 1,833million per annum over the next five years. These include costs for rehabilitation, Royalties, Retrenchment cost, Engineering, Occupational Environment and Hygiene, Environmental Management, Health and Safety, and other typical centralised costs (Table 80 to Table 83).
205 Table 80: Historical and Forecast Capital Expenditure – Current Operations 2022 - 2031 Historical Real Forecast Units C2019 C2020 C2021 LoM C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 C2030 C2031 Total 1 2 3 4 5 6 7 8 9 10 Sustaining Capital (ZARm) 326 318 619 5,769 726 375 379 307 260 256 218 221 214 218 Table 81: Historical and Forecast Capital Expenditure – Current Operations 2032 2053 Real Forecast Units C2032 -C2036 C2037-C2041 C2042 -C2046 C2047 -C2051 C2050 -C2053 11-15 16 -20 21 -25 26 -30 31 -32 Sustaining Capital (ZARm) 1,079 1,008 396 111 0 Table 82: Historical and Forecast Operating Costs 2022 - 2030 Historical Real Forecast Units C2019 C2020 C2021 LoM C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 C2030 C2031 Total 1 2 3 4 5 6 7 8 9 10 Operating Cost (ZARm) 10,102 9,704 11,532 202,798 13,717 13,633 13,776 13,535 12,355 11,061 8,536 7,996 6,546 6,600 Tonnes Milled (Kt) 11,379 10,460 12,053 124,629 12,566 12,446 12,497 12,265 10,508 5,506 4,471 3,956 3,253 3,352 Operating Cost (ZAR/t) 888 928 957 1,627 1,092 1,095 1,102 1,103 1,176 2,009 1,909 2,021 2,012 1,969 206 Table 83: Historical and Forecast Operating Costs 2031 - 2052 Real Forecast Units C2032 -C2036 C2037-C2041 C2042 -C2046 C2047 -C2051 C2050 -C2053 11-15 16 -20 21 -25 26 -30 31 -32 Operating Cost (ZARm) 32,621 31,828 19,643 10,761 190 Tonnes Milled (Kt) 16,490 15,939 7,749 3,631 0 Operating Cost (ZAR/t) 1,978 1,997 2,535 2,964 0 207 19 Economic Analysis 19.1 Introduction The following Section presents a discussion and comment on the economic assessment of the Rustenburg Operations LoM. Specifically, the comment is included on the methodology used to generate the financial models for Rustenburg Operations to establish a base case, including the basis of the techno-economic model, modelling techniques and evaluation results. 19.2 Economic Analysis Approach Rustenburg Operations can be classified as a Production Property as it has a significant, detailed cost and capital information specific to the geographic and economic locality of its assets. The cash-flow approach is the most appropriate method to use for economic analysis. 19.3 Economic Analysis Basis The assumptions on which the economic analysis is based include: • All assumptions are in 31 December 2021 money terms, which is consistent with the Mineral Reserve declaration date • Royalties on revenue are consistent with relevant South African legislation (0.5 – 12.5% based on formula) (refer to) • Corporate taxes that can be offset against assessed losses and capital expenditure (refer to Table 84) • A Real base case Discount Rate of 5% and • Discounted cash-flow (DCF) techniques applied to post-tax pre-finance cash flows and reported in financial year ending 31 December 2021. Sensitivity analysis was performed to ascertain the effect of discount factors, product prices, total cash costs and capital expenditures. The post-tax pre-finance cash flows presented for the mining asset incorporate the macroeconomic projections set out inTable 85 and Table 86. • The Technical – Economic Model (TEM) is presented in real terms are based on annual cash- flow projections determined at end-point 31 December 2021 208 19.4 TEM Parameters Table 84 provides details of the parameters applied in the TEM. Table 84: TEM Parameters Parameter Units Historical Corporate Tax Rate (%) 27% Royalties (based on formula) (%) 0.5% - 12.5% Trading Terms Debtors (Days) 3 Creditors (Days) 45 Stores (Days) 45 Balance at 31 December 2020 Debtors (ZARm) 263 Creditors (ZARm) 663 Stores - opening balances (ZARm) Unredeemed Capital - 31 December (ZARm) Environmental Closure Liability – 31December (ZARm) 609 Terminal Benefits Liability Based on LoM (ZARm) 993 Assessed Losses (Years) N/A Sibanye-Stillwater has indicated that the balances for working capital will be settled at the effective date of the Mineral Reserve declaration, and as such, the opening balances have been set to zero. The corporate tax rate applied is based on a formula that uses capital expenditure and assessed tax losses. Royalties are calculated using the formula for refined metals [Royalty Payable = 0.5+ (EBIT/Gross Sales)/12.5]. 19.5 Technical Economic Model The technical inputs used to determine the financial parameters for the TEMs are provided in Table 85 to Table 88, as well as an assessment of the financial parameters on a unit cost basis: ZAR/4Eoz.
209 Table 85: TEM – Mining, Processing, P ’s Sold and Revenue, Cash Costs, Taxation, Capital Expenditure and Free Cash – 2022-2031 LoM C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 C2030 C2031 Units Total 1 2 3 4 5 6 7 8 9 10 Underground Mining Development (m) 446,815 33,924 31,212 28,936 26,925 24,844 23,661 22,281 21,642 21,391 20,776 ROM (kt) 98,529 7,166 7,046 7,097 6,865 6,008 5,506 4,471 3,956 3,253 3,352 Head Grade (g/t) 3.84 3.45 3.50 3.52 3.59 3.76 3.85 3.74 3.83 3.98 3.98 Recoveries (%) 84.8% 85.5% 85.5% 85.4% 85.3% 85.2% 85.1% 84.7% 84.5% 84.3% 84.3% PGM Ounces (4E0z'000) 10,309 679 678 686 677 618 580 455 412 351 361 Recovered Grade (g/t) 3.25 2.95 2.99 3.01 3.07 3.20 3.28 3.16 3.24 3.35 3.35 Surface ROM (kt) 26,100 5,400 5,400 5,400 5,400 4,500 0 0 0 0 0 Head Grade (g/t) 1.06 1.04 1.07 1.07 1.07 1.07 0 0 0 0 0 Recoveries (%) 30.5% 30.5% 30.5% 30.5% 30.5% 30.5% 0 0 0 0 0 PGM Ounces (4E0z'000) 272 55 57 57 57 47 0 0 0 0 0 Recovered Grade (g/t) 0.32 0.32 0.33 0.33 0.33 0.33 0.00 0.00 0.00 0.00 0.00 Processing Ore Processing (kt) 124,629 12,566 12,446 12,497 12,265 10,508 5,506 4,471 3,956 3,253 3,352 Head Grade (g/t) 3.26 2.42 2.45 2.46 2.48 2.61 3.85 3.74 3.83 3.98 3.98 Recoveries (%) 81.1% 75.3% 75.0% 75.1% 74.9% 75.6% 85.1% 84.7% 84.5% 84.3% 84.3% Recovered Grade (g/t) 2.64 181.8% 183.5% 185.0% 185.9% 196.9% 327.7% 316.3% 324.1% 335.4% 335.3% PGM Produced (4Eoz) 10,581 734 734 743 733 665 580 455 412 351 361 Basket Price Basket Price (R/4Eoz) 28,909 27,230 27,163 27,270 27,387 27,581 28,348 29,692 30,218 30,599 30,562 210 LoM C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 C2030 C2031 Units Total 1 2 3 4 5 6 7 8 9 10 Revenue 4E Revenue (ZARm) 289,111 18,967 18,921 19,220 19,041 17,388 15,560 12,739 11,743 10,111 10,406 Other Metals (ZARm) 9,504 618 620 630 619 563 497 422 385 324 335 Base Metals (ZARm) 12,635 1,151 1,130 1,140 1,112 986 859 478 419 346 356 Revenue from sales of mining products (ZARm) 311,250 20,736 20,671 20,990 20,771 18,937 16,916 13,640 12,547 10,781 11,098 Operating Cost Direct Operations Cost (ZARm) 201,286 13,717 13,633 13,776 13,535 12,343 10,763 8,516 7,896 6,459 6,600 RBN Royalties (ZARm) 772 156 151 136 134 117 78 0 0 0 0 Terminal benefits costs (ZARm) 993 0 0 0 0 12 265 0 100 0 0 Environmental closure cost (ZARm) 519 0 0 0 0 0 33 20 0 87 0 Royalty payable (ZARm) 1,556 104 103 105 104 95 85 68 63 54 55 Recurring pre-tax income from continuing operations (EBITDA) (ZARm) 106,123 6,759 6,784 6,972 6,998 6,371 5,693 5,036 4,488 4,181 4,442 Taxation (ZARm) 27,219 1,629 1,730 1,780 1,807 1,650 1,468 1,301 1,152 1,071 1,140 Net Income from continuing operations (ZARm) 78,904 5,130 5,054 5,192 5,192 4,721 4,225 3,735 3,336 3,110 3,301 Capital Expenditure (ZARm) 5,769 726 375 379 307 260 256 218 221 214 218 Net Free cash (ZARm) 73,134 4,405 4,679 4,813 4,885 4,460 3,969 3,517 3,115 2,896 3,083 211 Table 86: TEM – ining, Pro essing, P ’s So d nd Re enue, C sh Costs, T x tion, C pit Expenditure nd Free C sh – 2032-2052 LoM C2032 - C2036 C2037 - C2041 C2042 - C2046 C2047 - C2051 C2052 - C2053 Units Total 11 - 15 16 - 20 21 - 25 26 - 30 31 - 35 Underground Mining Development (m) 446,815 86,983 57,963 29,494 16,782 0 ROM (kt) 98,529 16,490 15,939 7,749 3,631 0 Head Grade (g/t) 3.84 4.02 4.01 4.05 4.24 0.00 Recoveries (%) 84.8% 84.3% 84.3% 85.0% 85.5% 0.0% PGM Ounces (4E0z'000) 10,309 1,797 1,733 858 424 0 Recovered Grade (g/t) 3.25 3.39 3.38 3.44 3.63 0.00 Surface ROM (kt) 26,100 0 0 0 0 0 Head Grade (g/t) 1.06 0 0 0 0 0 Recoveries (%) 30.5% 0 0 0 0 0 PGM Ounces (4E0z'000) 272 0 0 0 0 0 Recovered Grade (g/t) 0.32 0.00 0.00 0.00 0.00 0.00 Processing Ore Processing (kt) 124,629 16,490 15,939 7,749 3,631 0 Head Grade (g/t) 3.26 4.02 4.01 4.05 4.24 0.00 Recoveries (%) 81.1% 84.3% 84.3% 85.0% 85.5% 0.0% Recovered Grade (g/t) 2.64 338.9% 338.2% 344.4% 362.9% 0.0% PGM Produced (4Eoz) 10,581 1,797 1,733 858 424 0 Basket Price 212 LoM C2032 - C2036 C2037 - C2041 C2042 - C2046 C2047 - C2051 C2052 - C2053 Units Total 11 - 15 16 - 20 21 - 25 26 - 30 31 - 35 Basket Price (R/4Eoz) 28,909 30,274 29,956 29,100 27,825 0 Revenue 4E Revenue (ZARm) 289,111 51,278 48,972 23,592 11,173 0 Other Metals (ZARm) 9,504 1,667 1,611 806 407 0 Base Metals (ZARm) 12,635 1,751 1,693 825 388 0 Revenue from sales of mining products (ZARm) 311,250 54,696 52,276 25,223 11,968 0 Operating Cost Direct Operations Cost (ZARm) 201,286 32,621 31,828 19,146 10,452 0 RBN Royalties (ZARm) 772 0 0 0 0 0 Terminal benefits costs (ZARm) 993 0 0 309 309 0 Environmental closure cost (ZARm) 519 0 0 189 0 190 Royalty payable (ZARm) 1,556 273 261 126 60 0 Recurring pre-tax income from continuing operations (EBITDA) (ZARm) 106,123 21,801 20,186 5,454 1,147 (190) Taxation (ZARm) 27,219 5,595 5,178 1,366 352 0 Net Income from continuing operations (ZARm) 78,904 16,206 15,008 4,088 795 (190) Capital Expenditure (ZARm) 5,769 1,079 1,008 396 111 0 Net Free cash (ZARm) 73,134 15,127 14,000 3,692 683 (190)
213 Table 87: TEM – Unit Analysis (ZAR/4Eoz) – 2022-2031 LoM C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 C2030 C2031 Units Total 1 2 3 4 5 6 7 8 9 10 Basket Price Basket Price (R/4Eoz) 28,909 27,230 27,163 27,270 27,387 27,581 28,348 29,692 30,218 30,599 30,562 Revenue 4E Revenue (R/4Eoz) 27,324 25,828 25,768 25,863 25,968 26,140 26,825 28,021 28,487 28,825 28,792 Other Metals (R/4Eoz) 898 842 844 847 844 846 858 929 934 924 926 Base Metals (R/4Eoz) 1,194 1,567 1,540 1,534 1,516 1,482 1,482 1,052 1,016 987 986 Revenue from sales of mining products (R/4Eoz) 29,416 28,236 28,152 28,245 28,328 28,469 29,164 30,002 30,437 30,736 30,704 Operating Cost Direct Operations Cost (R/4Eoz) 19,023 18,679 18,566 18,538 18,458 18,556 18,556 18,731 19,156 18,414 18,261 RBN Royalties (R/4Eoz) 73 212 206 184 183 176 134 0 0 0 0 Terminal benefits costs (R/4Eoz) 94 0 0 0 0 17 456 0 242 0 0 Environmental closure cost (R/4Eoz) 49 0 0 0 0 0 57 44 0 249 0 Royalty payable (R/4Eoz) 147 141 141 141 142 142 146 150 152 154 154 Recurring pre-tax income from continuing operations (EBITDA) (R/4Eoz) 10,030 9,204 9,239 9,382 9,545 9,577 9,815 11,077 10,887 11,920 12,290 Taxation (R/4Eoz) 2,572 2,218 2,357 2,395 2,464 2,480 2,531 2,861 2,795 3,054 3,155 Net Income from continuing operations (R/4Eoz) 7,457 6,986 6,882 6,987 7,081 7,097 7,285 8,216 8,092 8,866 9,134 Capital Expenditure (R/4Eoz) 545 988 510 510 419 392 442 480 536 609 604 Net Free cash (R/4Eoz) 6,912 5,998 6,372 6,477 6,662 6,706 6,842 7,736 7,556 8,256 8,530 214 Table 88: TEM – Unit Analysis (ZAR/4Eoz) – 2032-2051 LoM C2032 - C2036 C2037 - C2041 C2042 - C2046 C2047 - C2051 Units Total 11 - 15 16 - 20 21 - 25 26 - 30 Basket Price Basket Price (R/4Eoz) 28,909 30,274 29,956 29,100 27,825 Revenue 4E Revenue (R/4Eoz) 27,324 28,538 28,256 27,499 26,369 Other Metals (R/4Eoz) 898 928 930 939 961 Base Metals (R/4Eoz) 1,194 974 977 961 916 Revenue from sales of mining products (R/4Eoz) 29,416 30,440 30,162 29,399 28,246 Operating Cost Direct Operations Cost (R/4Eoz) 19,023 18,155 18,364 22,317 24,669 RBN Royalties (R/4Eoz) 73 0 0 0 0 Terminal benefits costs (R/4Eoz) 94 0 0 360 729 Environmental closure cost (R/4Eoz) 49 0 0 220 0 Royalty payable (R/4Eoz) 147 152 151 147 141 Recurring pre-tax income from continuing operations (EBITDA) (R/4Eoz) 10,030 12,133 11,647 6,357 2,707 Taxation (R/4Eoz) 2,572 3,114 2,988 1,592 831 Net Income from continuing operations (R/4Eoz) 7,457 9,019 8,659 4,765 1,875 Capital Expenditure (R/4Eoz) 545 601 582 461 263 Net Free cash (R/4Eoz) 6,912 8,419 8,078 4,304 1,612 215 19.6 DCF Analysis The following NPV sensitivities are included in this Section: • NPV’s at a range of discount factors in relation to the Discount Rate of 5% (Real) (Table 89). A range of discount factors from 0% to 10% with their associated NPVs are presented for each case. Rustenburg Operations can be evaluated at different discount factors and the sensitivity to the discount factor. • Twin parameter sensitivities are presented evaluating Revenue against Operating Costs. NPV’s at higher product price levels are shown up to a 20% increase in price, which captures any upside potential. Since markets are inherently volatile, the downside risk is reflected in the 20% decrease in price in increments. The achievability of LoM plans, budgets and forecasts cannot be assured as they are based on economic assumptions, many of which are beyond the control of Rustenburg Operations. Future cash flows and profits derived from such forecasts are inherently uncertain and actual results may be significantly more or less favourable. It is for this reason that QP presents sensitivities for Operating Costs, ranging from -20% to +20%. The most optimistic analysis, which assumes prices have been under-estimated by 20% and Operating Costs over-estimated by 20%, yields an NPV in the top right-hand corner of Table 90. Conversely, the most pessimistic analysis, which assumes prices have been over-estimated by 20% and Operating Costs under-estimated by 20%, yields an NPV in the bottom left-hand corner of Table 90. • NPV sensitivity to sales revenue and capital expenditure derived from twin parameter sensitivities at the Discount Rate of 5% (Real) (Table 91). Twin parameter sensitivities are presented evaluating Revenue against capital expenditure costs. Capital expenditures are estimates until contracts, which specify the deliverable, are signed by clients. It is for this reason that the QP presents sensitivities for capital costs from -20% to +20%. The most optimistic analysis, which assumes prices have been under-estimated by 20% and capital expenditure costs over- estimated by 20%, yields an NPV in the top right-hand corner of Table 91. Conversely, the most pessimistic analysis, which assumes prices have been over-estimated by 20% and capital expenditure costs under-estimated by 20%, yields an NPV in the bottom left-hand corner of the Table 91. Table 89: NPV (Post-tax) at Various Discount Factors Discount Factor (%) NPV (ZARm) 0.00% 62,296 2.00% 50,668 5.00% 38,827 7.00% 33,341 10.00% 27,374 216 Table 90: Twin Parameter NPV (Post-tax) Sensitivity at a 5% Discount Rate (Revenue, Operating Costs) Post-Tax NPV@5% Revenue Sensitivity Range (ZARm) -20% -10% -5% 0% 5% 10% 20% Total operating cost sensitivity range -20% 34,858 55,392 65,660 75,927 86,195 96,462 116,997 -10% 21,446 41,981 52,249 62,516 72,784 83,051 103,586 -5% 14,741 35,276 45,543 55,810 66,078 76,345 96,880 0% 8,035 28,570 38,837 49,105 59,372 69,640 90,175 5% 1,329 21,864 32,132 42,399 52,667 62,934 83,469 10% (5,376) 15,159 25,426 35,694 45,961 56,228 76,763 20% (18,787) 1,747 12,015 22,282 32,550 42,817 63,352 Table 91: Twin Parameter NPV (Post-tax) Sensitivity at a 5% Discount Rate (Revenue, Capital Expenditure) Post-Tax NPV@5% Revenue Sensitivity Range (ZARm) -20% -10% -5% 0% 5% 10% 20% Capital cost sensitivity range -20% 8,821 29,356 39,623 49,891 60,158 70,426 90,960 -10% 8,428 28,963 39,230 49,498 59,765 70,033 90,568 -5% 8,231 28,766 39,034 49,301 59,569 69,836 90,371 0% 8,035 28,570 38,837 49,105 59,372 69,640 90,175 5% 7,839 28,373 38,641 48,908 59,176 69,443 89,978 10% 7,642 28,177 38,444 48,712 58,979 69,247 89,782 20% 7,249 27,784 38,052 48,319 58,586 68,854 89,389 19.7 Summary Economic Analysis The summary economic analysis of Rustenburg is based on the Cash-Flow Approach. There is no other appropriate method of analysis for this operation. The summary economic evaluation for Kroondal (Table 92) are based on the current business plan of the operation and excludes any impact of Secondary Taxation on Companies and adverse international or local events, impact of that risk is illustrated in Table 80 and Table 81 indicating sensitivity impact as a result of fluctuations in operating cost, capital and metal price sensitivities. The economic model has been undertaken to support the declaration of Mineral Reserves (Table 42)
217 Table 92: NPV (Post-tax) Relative to ZAR/4Eoz Basket Price at a 5% Discount Rate Long Term Price (R/4Eoz) Revenue Sensitivity Range -20% -10% -5% 27.228 5% 10% 20% NPV@ Base case discount Rate 8,035 28,570 38,837 49,105 59,372 69,640 90,175 19.8 QP Opinion The QP is satisfied that the economic analysis fairly represents the financial status of the operation as at 31 December 2021. 218 20 Adjacent Properties Rustenburg is part of the Western Limb of the Bushveld Complex. Positions of these mines are shown in Figure 2. Below is a list of adjacent mines/operations. Table 93 gives the mine, owner, commodities mined and link to the Company websites. For current information on these properties, the reader should refer to the official websites. Mineralization on the adjacent properties is continuous across all properties however, variations across the deposit occurs and the quantum and grade of the mineralization at these mines may not be indicative of the same at Rustenburg. The Kroondal and Rustenburg Mines are a single orebody with shared services and infrastructure. Data from the Kroondal Operations has been used in the estimation of Mineral Resource and some operations information has been shared in the estimation of the Mineral Reserves. Refer to Section 21 for details information. Kroondal and Marikana are owned and operated by the Registrant. There are shared services between these operations and the Kroondal Operations. The QPs for these mines are the same as for the Rustenburg Operations. The QP’s have verified the information in the public sources. Impala Mines are operated by a 3rd Party. The QPs have not verified the information in the public sources. Table 93: Adjacent Mines/Operations Mine name Owners Commodities Source of information Impala’s Mines Impala Platinum Holdings Limited PGM https://www.implats.co.za/ *Kroondal Operations Sibanye-Stillwater PGM https://www.sibanyestillwater.com/ *Marikana Operations Sibanye -Stillwater PGM https://www.sibanyestillwater.com/ 219 21 Other Relevant Data and Information 21.1 Risk Analysis 21.1.1 Financial Assessment Accuracy Table 94 provides details of accuracy limits in the major financial categories. Kroondal does not directly report contingencies for Operating costs but rather provides for this as part of sustaining capital at 4% of Operating cost. There are no new capital projects and no assessed capital risks. Table 94: Financial Assessment Accuracy Risks Mitigation Measures Price Risk (Mineral Reserve Risk) - Revenue -assessed the prices using various sensitivities (-10% to +10%) - the forecast price considered multiple scenarios Economic Viability Risk (Mineral Reserve Risk) - Operating Costs -assessed the Operating Costs using various sensitivities (-20% to +20%) Economic Viability Risk (Mineral Reserve Risk) - Capital Expenditure -assessed the Capital Expenditure based on 4% of operating costs for sustaining capital and technical studies for new projects (-20% to +20%) 21.1.2 Risk to the Mineral Resources and Mineral Reserves As part of the annual operational planning process, the Rustenburg Operations management team assessed all the major risks that impact the execution of the plan. Sibanye-Stillwater maintains a risk register at the corporate level detailing all significant risks that may impact the operations. The Risk register is updated quarterly. Risks are listed by the source of the risk, the type of operational risk. Risks are assessed for likelihood of occurrence and severity for inherent risks to assess the unmitigated impact on the operations. The risk is reassessed once reasonable mitigation plans have been applied to give a residual risk using the same scale as for inherent risk. The following major risks have been identified. 21.1.2.1 Mineral Resources There are no deemed material risks to the Mineral Resource Estimate. 220 21.1.2.2 Mineral Reserves The key operational risks that could impact the Mineral Reserves are listed below. Commodity prices and exchange rate assumptions Sibanye-Stillwater has adopted forward-looking price assumptions. Any material deviations from these assumptions could impact the Mineral Reserves, especially at marginal operations. The QPs are of the view that these prices applied to our LoM valuations are realistic considering the external guidance received. ESG and social unrest The SA PGM operations are situated in close proximity to large communities with high unemployment rates and low incomes. As such, it is continually at risk to social unrest events. From a social and governance perspective, the Group has implemented appropriate objectives and initiates to address this risk. From an environmental perspective, the area experiences significant pressure on potable and fresh water supply. The adoption of the PGM water stewardship, GHG and footprint reduction during 2022 will enable these operations to meet the requirements defined by our ESG commitments. Cost escalation Cost escalation assumptions relating to factors such as wages, utilities like electricity and operational consumables (explosives and steel) are aligned with Group estimates. Continuous improvement initiatives adopted to contain cost escalation are in place to mitigate this risk. Operational Risk Operational underperformance and slower than planned production build-up at projects may result in variations between planned and achieved production rates. Short interval controls are in place to enable the implementation of timeous interventions and, therefore, correction of deviations to plans. 21.2 Rustenburg and Kroondal Shared Mining Services Mineral Resources and Mineral Reserves at the Rustenburg Operations(SRPM) are declared within the NW82MR, whilst for the Kroondal Operations, Resources and Reserves are declared within the NW80MR. These mining rights are held by the different legal entities of SRPM and Anglo American Platinum respectively. In order to accurately declare Resources and Reserves in line with regulatory requirements and existing mining right boundaries, the Reserves mined at SRPM (within NW82MR) yet accessed through Kroondal infrastructure (by means of deepening decline shafts) are declared at SRPM. The Business Plan 22 LoM of the Kroondal Operations is based on the full extraction of Reserve Tonnes and Oz from both the NW80MR and NW82MR for costing and processing purposes (Table 39 and Table 40, Section 12, Section14.1 and Table 85 Table 86, Section 19.4) Since the LoM valuation is determined on 100% of the production plan, there is inevitably a difference between what is determined in the LoM and the Mineral Reserves declared for the relevant right holder.
221 This approach results in a misalignment between the Tonnes and Oz reflected in the Reserve Statement and the BP22 LoM Tonnes and Oz for both SRPM and Kroondal. Individually Tonnes and Oz do not balance between Reserves (31 Dec 2021) and BP22 LoM, however when combined there is full and complete alignment in the numbers (Table 95). Table 95: Kroondal - Rustenburg Reserves and LOM Balance Mine Mineral Reserve* Tonnes (million) Mineral Reserve *Metal (4E MOzt) LOM Tonnes(Millions) LOM Metal (MOzt) Kroondal 20.8 1.7 41.3 3.528 Rustenburg 169.1 15.5 146.9 13.65 Total 189.1** 17.2 188.2** 17.2 *Proved and Probable Reserves, *Differences due to rounding errors 222 22 Interpretation and Conclusions In considering the valuation as derived herein, a critical factor is the assumption regarding the future projection is the South African Rand (ZAR) exchange rate against the USD. The views expressed in this Technical Report Summary have been based on the fundamental assumption that the required management resources and proactive management skills will be focused on meeting the LoM plans and production targets provided by Rustenburg Operations. The QP has conducted a comprehensive review and assessment of all material issues likely to influence future operations based on information available up to 31 December 2021. 223 23 Recommendations There are no recommendations for additional work or changes. 224 24 References 24.1 List of Reports and Sources of Information 24.1.1 Publications and Reports Ballhaus, C.G. 1988. Potholes of the Merensky Reef at Brakspruit Shaft, Rustenburg Platinum Mines: Primary disturbances in the magmatic stratigraphy. Economic Geology, vol. 83. p. 1140-1158. Beukes, J.P and van Zyl, P.G., 2017. Review of Atmospheric SO2 Data Collected with Passive Sampling and Regional Perspective, Atmospheric Chemistry Research Group, North West University, p. 27. Brown, A., Smith, B., Ross, H., Changara, L., Mugovhani, R., and Gewers, N., 2019, Competent Person’s Report on the Material Assets of the Rustenburg Operations including Hoedspruit PGM Projects Situated near Rustenburg, Northwest, South Africa, Sibanye Stillwater, Platinum Division, Mine Technical Services Team, unpubl, p. 257 Carr, H.W., Groves, D.I., and Cawthörne, R.G. 1994. The Importance of synmagmatic deformation in the formation of Merensky Reef potholes in the Bushveld Complex. Economic Geology, vol. 89. p. 1398- 1410. Cawthorn, R.G., Eales, H.V., Walraven, F., Uken, R. and Watkeys, M.K., 2006. The Bushveld Complex. In: Geology of South Africa. Edited by M.R. Johnson, C.R. Anhaeusser and R.J. Thomas. Geological Society of South Africa. 261-281. Cawthorn, R.G., (2010). The Platinum Group Element Deposits of the Bushveld Complex in South Africa, Platinum Metals Rev., 2010, 54, (4) 205doi:10.1595/147106710x520222. https://www.technology.matthey.com/article/54/4/205-215/#B1 Crowson, P.,(2001) “Minerals Handbook 2000–01: Statistics and Analyses of the World's Minerals Industry”, Mining Journal Books Ltd, Edenbridge, Kent, UK. Quoted in Cawthorn 2010. https://www.technology.matthey.com/article/54/4/205-215/#B1 Cowley, A., Bloxham, L., Brown, S., Cole, L., Fujita, M., Girardot, N., Jiang, J., Raithatha, R., Ryan, M., Shao, E., Tang, B., Wang, A., Xiaoyan, F., 2021. The PGM market report, Johnson-Matthey, https://matthey.com/en/news/2021/pgm-market-report-february-2021 Gruenewaldt, R.,(2017). Air Quality Short Summary Report for Various Scenarios at Lonmin Marikana, Airshed. Midrand March 2017. Golder Associates, 2021. Determination of the 2021 Closure Costs for the Marikana Platinum Mining Operation, Sibanye-Stillwater Limited, Golder Associates Africa (Pty) Ltd, 21467970-349390-1, p. 39 Krivolutskaya, N.A. (2014) Evolution of Trap Magmatism and Pt-Cu-Ni mineralization in the Noril'sk region. Publishing Association of Scientific Publications KMK, Moscow [in Russian]. McCallum, I.S. (1996) The Stillwater Complex. In Developments in Petrology. Elsevier. p.441-483. doi:10.1016/s0167-2894(96)80015-7
225 O’Brien. A., and Scheepers, A., 2016. Sibanye Rustenburg Platinum Mines Limited, Environmental Management Programme (NW30/5/1/2/2/82 MR), WSP Parsons Brinckerhoff, unpbl, p453 Potgieter, J.G., 2011. Atmospheric Impact Assessment, Information/Subsections for 2011 EMPR: WPL, Central and EL, Environgaka cc, unpub, p. 57 Reczko, B.F.F., Oberholzer, J.D., Res, M., Erikson, P.G. and Schreiber, U.M. (1995). A re-evaluation of the volcanism of the Palaeoproterozoic Pretoria Group (Kaapvaal craton) and hypothesis on basin development. Journal of African Earth Sciences 21, 505-519. Scoon, R.N. and Mitchell; A.A. The principal geological features of the Mooihoek platiniferous dunite pipe, eastern limb of the Bushveld Complex, and similarities with replaced Merensky Reef at the Amandelbult Mine, South Africa. South African Journal of Geology 2011; 114 (1): 15–40. Smith, D.S, Basson, I.J, Reid, D,L; Normal Reef subfacies of the Merensky Reef at Northam Platinum mine, Zwartklip Facies, Western Bushveld Complex, South Africa. The Canadian Mineralogist 2004; 42 (2): 243– 260. doi: https://doi.org/10.2113/gscanmin.42.2.243 Tetteh, M. and Cawood, F., (2014). Mine call factor issues from a surface mine perspective, https://www.ee.co.za/article/mine-call-factor-issues-surface-mine- perspective.html#:~:text=The%20theory%20of%20mine%20call%20factor%20%28MCF%29%20compares, the%20mines%20evaluation%20methods%20expressed%20as%20a%20percentage. Watson, B.P., Hoffmann, D., and Roberts, D.P. (2021). Investigation of stress in a pothole in the Bushveld Complex: A case study. In Journal of the Southern African Institute of Mining and Metallurgy. Volume 121 n.1 Johannesburg. January 2021. Wellsted, J., 2020. Biodiversity Management at Sibanye Stillwater, Sibanye-Stillwater Limited, unpubl, p. 20 24.1.2 Spreadsheets and Presentations Consolidated Group structure-8 December 2020.xlsx Rustenburg Mine - Finance Section Backup 20220307.xlsx Copy of TRS Reserve Tables 31 Dec 2021 v3 Final 14-04-2022.xlsx 24.2 Glossary of Terms South African Mining terms Mine Call Factor(MCF) - compares the sum of metal produced in recovery plus residue to the metal called for by the mines evaluation methods expressed as a percentage. For explanation, see Tetteh and Cawood(2014). Reef – South African Mining term for a Seam. Derived from Afrikaans/Dutch rif- ridge for the Witwatersrand goldfields where the seam formed ridges in outcrop. 226 25 Qualified Persons’ Consents We, the signees, in our capacity as Qualified Persons pursuant to Subpart 1300 of Regulation S-K of the US Securities Act of 1933 (SK-1300), each hereby consent to: • the public filing and use by Sibanye Stillwater Limited of the Technical Report Summaries for which I am responsible; • the use and reference to my name, including my status as an expert or “Qualified Person” (as defined by SK-1300) in connection with the Technical Report Summaries for which I am responsible; • the use of any extracts from, information derived from or summary of the Technical Report Summaries for which I am responsible in the annual report of Sibanye-Stillwater on Form 20-F for the year ended 31 December 2021 (Form 20-F); and • the incorporation by reference of the above items as included in the Form 20-F into Sibanye- Stillwater’s registration statement on Form F-3 (File No. 333-234096) (and any amendments or supplements thereto). I am responsible for overseeing, and this consent pertains to, the Technical Report Summaries for which my name appears below and certify that I have read the 20-F and that it fairly and accurately represents the information in the Technical Report Summaries for which I am responsible. Property Name QP Name Affiliation to registrant Field or area of responsibility Signature SA PGM Rustenburg Operations Andrew Brown Full time employee Lead /s/ Andrew Brown Manie Keyser Full time employee Resources, Reserves, Mine Planning /s/ Manie Keyser Brian Smith Full time employee Mineral Reserves /s/ Brian Smith Nicole Wansbury Full time employee Mineral Resources /s/ Nicole Wansbury Stephan Botes Full time employee Surface and Mineral Rights /s/ Stephan Botes Mandy Jubileus Full time employee Environmental Compliance /s/ Mandy Jubileus Dewald Cloete Full time employee Mineral Processing /s/ Dewald Cloete Roderick Mugovhani Full time employee Financial Evaluation /s/ Roderick Mugovhani 227 26 Reliance on information provided by the registrant The QPs have relied on information provided by Sibanye-Stillwater SA PGM Operations and Sibanye- Stillwater (the registrant) in preparing the findings and conclusions regarding the following aspects of the modifying factors outside of the QPs expertise: • Macroeconomic trends, data and assumptions, and commodity prices (Section 16) • Risks (Section 21.2) • Sibanye-Stillwater assess the factors above at a corporate level and has the necessary skills to make this assessment.
Exhibit 96.4 TECHNICAL REPORT SUMMARY ON THE MATERIAL ASSETS OF THE KROONDAL OPERATIONS Situated near Rustenburg, North West Province, South Africa 31 December 2021 Prepared by: Qualified Persons from Sibanye-Stillwater, PGM Operations ii Important Notices Mineral Resources and Mineral Reserves are declared as attributable to Sibanye-Stillwater Ltd (registrant). Sibanye-Stillwater operates the Kroondal Operations and as such may accrue benefits in addition to the income from the attributable portions of the Mineral Reserves. For the purposes of transparency and because it is not possible to accurately separate out the non-attributable interests in these models, the Life-of-Mine plan and financial analyses are given for the full Mineral Reserve. Wherever mention is made of “Kroondal Operations”, for the purposes of this Technical Report Summary, Kroondal Operations refers to a 50 - 50 Pool and Share Agreement between Sibanye Stillwater and Anglo American Platinum to mine the Mineral Reserves under an exclusive agreement. Sibanye- Stillwater manages the operation. In this document, a point is used as the decimal marker and the comma is used for the thousands separator (for numbers larger than 999) in the text. In other words, 10,148.32 denotes ten thousand one hundred and forty-eight point three two. The word ‘tonnes’ denotes a metric tonne (1,000 kg). The abbreviation “lb” denotes the weight pounds in the sense understood in the USA. The Platinum, Palladium, Rhodium and Gold (4E) prices are quoted in US dollars per troy ounce (USD/oz.) or South African Rand per kilogram (ZAR/kg). 6E denotes a basket of PGM’s Platinum, Palladium, Rhodium, Gold, Iridium and Ruthenium. Chrome refers to Chromium Oxide Cr2O3. The paylimit (cm.g/t or g/t) of an operation is the average value or grade for that operation which includes all direct and indirect costs i.e., the value at which it is estimated that ore can be mined without profit or loss. The cut-off grade (cm.g/t or g/t) of an operation is the minimum value or grade at which an area can be mined to maintain an average value in line with the paylimit. The cut-off is unique to the orebody being mined and is dependent on maintaining a mining mix that follows the orebody’s value distribution. NOTE: The Merensky and UG2 Reefs at the Kroondal Operations and the contiguous Sibanye-Stillwater owned Rustenburg Operations are single orebodies and are estimated as single geological units across the two properties. A portion of the Rustenburg Mineral Reserves will be accessed through the Kroondal Infrastructure and this tonnage is reflected in the Kroondal Life-of-Mine Schedule and financial model and not Rustenburg. However, Mineral Resources and Mineral Reserves are divided and reported within their respective mineral rights boundaries. Trademarks. Certain software and methodologies may be proprietary. Where proprietary names are mentioned TM or © are omitted for readability. This report contains statements of a forward-looking nature which are subject to a number of known and unknown risks, uncertainties and other factors that may cause the results to differ materially from those anticipated in this report. iii Date and Signature Page Qualified Persons Position Signature Signature Date Andrew Brown Vice President: Mine Technical Services /s/ Andrew Brown 14 April 2022 Manie Keyser Senior Manager Mine Planning and Resource Management /s/ Manie Keyser 14 April 2022 Nicole Wansbury Unit Manager Geology Mineral Resources Nicole Wansbury 14 April 2022 Brian Smith Unit Manager Survey /s/ Brian Smith 14 April 2022 Stephan Botes Unit Manager – Surface and Mineral Rights /s/ Stephan Botes 14 April 2022 Mandy Jubileus Environmental Manager /s/ Mandy Jubileus 14 April 2022 Dewald Cloete SVP Processing Dewald Cloete 14 April 2022 Roderick Mugovhani SVP Finance /s/ Roderick Mugovhani 14 April 2022 iv 1 EXECUTIVE SUMMARY 1 1.1 INTRODUCTION 1 1.2 PROPERTY DESCRIPTION, MINERAL RIGHTS AND OWNERSHIP 1 1.3 GEOLOGY AND MINERALISATION 2 1.4 EXPLORATION STATUS, DEVELOPMENT, OPERATIONS AND MINERAL RESOURCE ESTIMATES 2 1.5 MINING METHODS, ORE PROCESSING, INFRASTRUCTURE AND MINERAL RESERVES 6 1.6 CAPITAL AND OPERATING COST ESTIMATES AND ECONOMIC ANALYSIS 8 1.7 PERMITTING REQUIREMENTS 9 1.8 CONCLUSIONS AND RECOMMENDATIONS 9 2 INTRODUCTION 10 2.1 REGISTRANT 10 2.2 COMPLIANCE 12 2.3 TERMS OF REFERENCE AND PURPOSE OF THE TECHNICAL REPORT SUMMARY 12 2.4 SOURCES OF INFORMATION 14 2.5 SITE INSPECTION BY QPS 14 2.6 UNITS, CURRENCIES AND SURVEY COORDINATE SYSTEM 14 2.7 RELIANCE ON INFORMATION PROVIDED BY OTHER EXPERTS 15 3 PROPERTY DESCRIPTION 16 3.1 LOCATION AND OPERATIONS OVERVIEW 16 3.2 MINERAL TITLE 20 3.3 ROYALTIES 27 3.4 LEGAL PROCEEDINGS AND SIGNIFICANT ENCUMBRANCES TO THE PROPERTY 27 4 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY 27 4.1 TOPOGRAPHY, ELEVATION AND VEGETATION 27 4.2 ACCESS, TOWNS AND REGIONAL INFRASTRUCTURE 28 4.3 CLIMATE 28 4.4 INFRASTRUCTURE AND BULK SERVICE SUPPLIES 28 4.5 PERSONNEL SOURCES 29 5 HISTORY 30 5.1 OWNERSHIP HISTORY 30 5.2 PREVIOUS EXPLORATION AND MINE DEVELOPMENT 31 5.2.1 Previous Exploration 32 5.2.2 Previous Development 34 6 GEOLOGICAL SETTING, MINERALIZATION AND DEPOSIT 34 6.1 REGIONAL GEOLOGY 34 6.2 DEPOSIT TYPE 37 6.2.1 Formation of Deposit 37 6.2.2 Stillwater Complex 38 6.2.3 Norilsk Province 38
v 6.2.4 Sudbury Complex 38 6.2.5 The Great Dyke 39 6.2.6 The Bushveld Complex 39 6.3 LOCAL AND PROPERTY GEOLOGY 40 6.3.1 Stratigraphy 40 6.3.2 Ore bodies 42 6.3.3 Structure 43 6.3.4 Mineralogy 47 7 EXPLORATION 48 7.1 EXPLORATION DATA 48 7.2 GEOPHYSICAL SURVEYS 48 7.3 TOPOGRAPHIC SURVEYS 48 7.4 EXPLORATION AND MINERAL RESOURCE EVALUATION DRILLING 48 7.4.1 Overview 48 7.4.2 Planned Evaluation Drilling for 2022 50 7.4.3 Drilling Methods 52 7.4.4 Core Logging and Reef Delineation 57 7.5 SURVEY DATA 59 7.6 DENSITY DETERMINATION 60 7.7 UNDERGROUND MAPPING 61 7.8 HYDROLOGICAL DRILLING AND TESTWORK 61 7.9 GEOTECHNICAL DATA, TESTING AND ANALYSIS 61 7.9.1 Data Collection 61 7.9.2 Testing Methods 62 7.9.3 Geotechnical Rockmass Characterisation 63 7.9.4 Geotechnical Results and Interpretation 64 8 SAMPLE PREPARATION, ANALYSES AND SECURITY 65 8.1 SAMPLING GOVERNANCE AND QUALITY ASSURANCE 65 8.2 REEF SAMPLING – SURFACE 66 8.3 REEF SAMPLING – UNDERGROUND 66 8.3.1 Channel Sampling 66 8.4 SAMPLE PREPARATION AND ANALYSIS 67 8.4.1 Laboratory 67 8.4.2 Sample Preparation and Analysis 67 8.4.3 QP Opinion 68 8.5 ANALYTICAL QUALITY CONTROL 68 8.5.1 Nature and Extent of the Quality Control Procedures 68 8.5.2 Quality Control Results 68 8.5.3 QP Opinion 70 9 DATA VERIFICATION 70 9.1 DATA STORAGE AND DATABASE MANAGEMENT 70 9.2 DATABASE VERIFICATION 71 9.2.1 Mapping 71 vi 9.2.2 Drillholes 71 9.2.3 Channel Sampling 72 9.3 QP OPINION 72 10 MINERAL PROCESSING AND METALLURGICAL TESTWORK 72 11 MINERAL RESOURCE ESTIMATES 72 11.1 ESTIMATION DOMAINS 73 11.1.1 Compositing 73 11.1.2 Estimation Domains 74 11.2 ESTIMATION TECHNIQUES 75 11.2.1 Grade and Tonnage Estimation 75 11.3 MINERAL RESOURCE CLASSIFICATION 85 11.3.1 Classification Criteria 85 11.3.2 Mineral Resource Technical and Economic Factors 87 11.4 MINERAL RESOURCE STATEMENTS 90 11.4.1 Mineral Resources per Mining Area (Inclusive of Mineral Reserves) 93 11.4.2 Changes in the Mineral Resources from Previous Estimates (Inclusive of Mineral Reserves) 96 11.5 QP STATEMENT ON THE MINERAL RESOURCE ESTIMATION AND CLASSIFICATION 96 12 MINERAL RESERVE 97 12.1 MINERAL RESERVE METHODOLOGY 97 12.2 MINE PLANNING PROCESS 97 12.3 HISTORICAL MINING PARAMETERS 98 12.4 SHAFT AND MINE PAYLIMITS 100 12.4.1 Paylimits 100 12.4.2 Modifying Factors 100 12.5 LOM PROJECTS 103 12.6 SPECIFIC INCLUSIONS AND EXCLUSIONS 103 12.6.1 Specific Exclusions: 103 12.6.2 Specific Inclusion: 103 12.7 MINERAL RESERVE ESTIMATION 103 12.8 SURFACE SOURCES 106 12.9 MINERAL RESERVES STATEMENT 106 12.10 MINERAL RESERVE SENSITIVITY 110 12.11 QP STATEMENT ON THE MINERAL RESERVE ESTIMATION 110 13 MINING METHODS 110 13.1 INTRODUCTION 110 13.2 SHAFT INFRASTRUCTURE, HOISTING AND MINING METHOD 111 13.2.1 Shaft Infrastructure 111 13.2.2 Hoisting 115 13.2.3 Mining Methods 115 13.3 GEOTECHNICAL ANALYSIS 115 13.3.1 Geotechnical Conditions 115 13.3.2 Stress and seismological setting 116 vii 13.3.3 Regional and local support 116 13.4 MINE VENTILATION 116 13.5 FLAMMABLE GAS MANAGEMENT 116 13.6 MINE EQUIPMENT 116 13.7 PERSONNEL REQUIREMENTS 117 13.8 FINAL LAYOUT MAP 117 14 PROCESSING AND RECOVERY 117 14.1 PROCESSING FACILITIES 118 14.1.1 K1 Plant 118 14.1.2 Kroondal No.2 Plant 124 14.2 FUTURE PROJECTS 129 14.3 SAMPLING, ANALYSIS, PGM ACCOUNTING AND SECURITY 130 14.4 PLANT LOCK-UP 130 14.5 ENERGY 131 14.6 WATER 131 14.7 PERSONNEL 131 14.8 QP OPINION ON PROCESSING 131 15 INFRASTRUCTURE 131 15.1 OVERVIEW OF INFRASTRUCTURE 131 15.2 TAILINGS STORAGE FACILITIES 133 15.2.1 K1 TSF 134 15.2.2 K150 TSF 134 15.2.3 K2 TSF 135 15.2.4 Marikana TSF 135 15.2.5 LoM Requirements 135 15.3 POWER SUPPLY 135 15.4 BULK WATER, FISSURE WATER AND PUMPING 137 15.5 ROADS AND TRANSPORT INFRASTRUCTURE 138 15.6 EQUIPMENT MAINTENANCE 139 15.6.1 Surface Workshops 139 15.6.2 Underground Workshops 139 15.7 OFFICES, HOUSING, TRAINING FACILITIES, HEALTH SERVICES ETC. 139 15.8 QP OPINION ON INFRASTRUCTURE 139 16 MARKET STUDIES 139 16.1 CONCENTRATES AND REFINED PRODUCTS 139 16.2 METALS AND MARKETING AGREEMENTS 139 16.3 MARKETS AND SALES 140 16.3.1 Introduction 140 16.3.2 Demand Summary 140 16.3.3 Supply Summary 141 16.3.4 Palladium and Platinum Pricing Outlooks 142 16.4 METALS PRICE DETERMINATION 143 16.4.1 Exchange Rate 143 viii 16.4.2 Platinum Group Metals Price Deck 143 16.4.3 Comparison to 2019 Prices 144 17 ENVIRONMENTAL STUDIES, PERMITTING, PLANS, NEGOTIATIONS/AGREEMENTS 145 17.1 SOCIAL AND COMMUNITY AGREEMENTS 145 17.1.1 Overview 145 17.1.2 Vision 146 17.1.3 Communities’ Priorities 146 17.2 HUMAN RESOURCES 147 17.2.1 Introduction 147 17.2.2 Human Resources 147 17.2.3 Legislation 147 17.2.4 Human Resource Development (Training) 150 17.2.5 Remuneration Policies 150 17.2.6 Industrial Relations 150 17.2.7 Employment Equity and Women in Mining (WIM) 151 17.3 HEALTH AND SAFETY 153 17.3.1 Policies and Procedures 153 17.3.2 Statistics 153 17.3.3 Occupational Health and Safety Management 154 17.3.4 HIV/AIDS 154 17.4 TERMINAL BENEFITS 154 17.5 ENVIRONMENTAL STUDIES 154 17.5.1 Introduction 154 17.5.2 Baseline Studies 156 17.5.3 Zone of Influence 158 17.5.4 Climate Change and Greenhouse Gas Emissions 163 17.5.5 Biodiversity Management 165 17.5.6 Water Use Strategy 166 17.5.7 Waste Management 172 17.5.8 Environmental Reporting 172 17.5.9 Closure Planning and Costs 179 17.6 QP OPINION 182 18 CAPITAL AND OPERATING COSTS 182 18.1 OVERVIEW 182 18.2 CAPITAL EXPENDITURE 182 18.3 OPERATING COSTS 184 18.3.1 Operating Costs by Activity 184 18.3.2 Operating Cost 184 18.3.3 Surface Sources Costs 184 18.3.4 Processing Costs 184 18.3.5 Allocated Costs 184 19 ECONOMIC ANALYSIS 186 19.1 INTRODUCTION 186
ix 19.2 ECONOMIC ANALYSIS APPROACH 186 19.3 ECONOMIC ANALYSIS BASIS 186 19.4 TEM PARAMETERS 187 19.5 TECHNICAL ECONOMIC MODEL 187 19.6 DCF ANALYSIS 194 19.7 SUMMARY ECONOMIC ANALYSIS 195 19.8 QP OPINION 196 20 ADJACENT PROPERTIES 196 21 OTHER RELEVANT DATA AND INFORMATION 196 21.1 RISK ANALYSIS 196 21.1.1 Financial Assessment Accuracy 196 21.1.2 Risk to the Mineral Resources and Mineral Reserves 197 21.2 RUSTENBURG AND KROONDAL SHARED MINING SERVICES 198 22 INTERPRETATION AND CONCLUSIONS 198 23 RECOMMENDATIONS 199 24 QUALIFIED PERSONS’ CONSENTS 199 25 REFERENCES 200 25.1 LIST OF REPORTS AND SOURCES OF INFORMATION 200 25.1.1 Publications and Reports 200 25.1.2 Spreadsheets and Presentations 202 25.2 GLOSSARY OF TERMS 202 26 RELIANCE ON INFORMATION PROVIDED BY THE REGISTRANT 202 x Figure 1: Ownership and Company Structure for the Kroondal Operations .......................... 11 Figure 2: General Location of the Material Assets .................................................................... 17 Figure 3: Kroondal Operations ................................................................................................... 19 Figure 4: Plan Showing Kroondal Mineral Right and Shafts ...................................................... 25 Figure 5: Aeromagnetic Survey for Kroondal Operations ........................................................ 33 Figure 6: Geology of the Bushveld Complex, South Africa ..................................................... 35 Figure 7: Geology of the Western Limb of the Bushveld Complex, South Africa ................... 36 Figure 8: Regional Stratigraphic Column of the Rustenburg Layered Suite ........................... 37 Figure 9: General Stratigraphic Column of the Local Geological Succession ...................... 41 Figure 10: Structural Interpretation ............................................................................................. 44 Figure 11: Typical Cross-Section ................................................................................................. 45 Figure 12: Schematic Diagram Showing the Model of the Pothole from the UG2 ................ 46 Figure 13: IRUP(red) unconformably cut across the layered lithological sequence. ............ 47 Figure 14: Reconciliation of Drillhole Data ................................................................................ 50 Figure 15 Reconciliation of Historic Drillhole Data .................................................................... 50 Figure 16: Overview of Drilled Boreholes Kroondal and Rustenburg....................................... 52 Figure 17: Example of Diamond Drill Core ................................................................................ 53 Figure 18: Schematic Vertical Section of a Typical Surface Drillhole ...................................... 54 Figure 19: Configurations for Cover Drilling - Single Cover Drilling Layout (plan view one-sided). ................................................................................................................. 56 Figure 20: Configurations for Cover Drilling - Double Cover Drilling Layout (Plan view). ....... 57 Figure 21: Example of CRM Result Monitoring 2020/2021 ........................................................ 69 Figure 22: Example of Blank Result Monitoring .......................................................................... 70 Figure 23: Composite Width ....................................................................................................... 74 Figure 24: UG2 Geozones ........................................................................................................... 75 Figure 25: Some Histograms of PGM (PGE) Distributions .......................................................... 77 Figure 26: Example of a Variogram Map .................................................................................. 78 Figure 27: Example of Variogram for 4E Grade for Different Geozones ................................. 79 Figure 28: Section Plot UG2 – Data versus Model ..................................................................... 82 Figure 29: UG2 Reef Grade -4E –Data versus Model ................................................................ 83 Figure 30: UG2 Reef Grade -4E – Old versus New Model ......................................................... 84 Figure 31: Mineral Resource Classification for UG2 .................................................................. 87 Figure 32: Conversion of Mineral Resource to Mineral Reserve .............................................. 93 xi Figure 33: Rustenburg and Kroondal UG2 Reef Accessibility .................................................. 94 Figure 34: Kroondal Operations Underground and Surface Mineral Resource Reconciliation ............................................................................................................ 96 Figure 35: Mineral Reserve Classification as at 31 December 2021 – UG2 Reef (includes adjacent mines of registrant) ................................................................. 105 Figure 36: The Kroondal Operations Mineral Reserve Reconciliation at 31 December 2021 ........................................................................................................................... 108 Figure 37: Mine Layout (Bord and Pillar) .................................................................................. 111 Figure 38: Townlands Section Infrastructure ............................................................................ 113 Figure 39: Kroondal Section Infrastructure .............................................................................. 114 Figure 40: K1 Concentrator Throughput Forecast .................................................................. 119 Figure 41: K1 Concentrator Production and Recovery Forecast .......................................... 120 Figure 42: The Schematic Process Flow Diagram for K1 Processing Plant ............................ 121 Figure 43: Aerial View for the K2 Plant ..................................................................................... 124 Figure 44: K2 Concentrator Throughput Forecast .................................................................. 126 Figure 45: K2 Concentrator Production and Recovery Forecast. ......................................... 126 Figure 46: The Schematic Process Flow Diagram for Kroondal No.2 Plant ........................... 127 Figure 47: The Layout of the Kroondal Operations ................................................................. 133 Figure 48: Location of Kroondal Operations Tailings Storage Facilities ................................. 134 Figure 49: Schematic Layout of Power Points of Supply and Surface Infrastructure ........... 136 Figure 50: Eskom Electricity Supply ........................................................................................... 137 Figure 51: Price Trends 2000-2021 ............................................................................................. 142 Figure 52: Kroondal Operations Zone of Influence ................................................................. 162 Figure 53: Kroondal Water Use Summary 2021 ....................................................................... 166 Figure 54: Rustenburg Regional Structures (Source: Zimmermann et.al., 2009) ................... 168 Figure 55: Sub-quaternary Reaches around Kroondal and source of potential contamination ......................................................................................................... 169 Figure 56: The Schematic Process Flow Diagram for Water Handling at the Rustenburg-Kroondal Complex .............................................................................. 171 xii Table 1: Attributable Mineral Resource Exclusive of Mineral Reserves as at 31 December 2021 ........................................................................................................... 4 Table 2: Attributable Mineral Resource Inclusive of Mineral Reserves as at 31 December 2021 ............................................................................................................................... 5 Table 3: Attributable Mineral Reserve as at 31 December 2021 ............................................... 7 Table 4: NPV (Post-tax) Relative to ZAR/4Eoz PGM Basket Prices at 5% Discount Rate ........... 8 Table 5: Twin Parameter NPV (Post-Tax) Sensitivity at 5% Discount Rate (Capital Costs) ........ 8 Table 6: Twin Parameter NPV (Post-Tax) Sensitivity at 5% Discount Rate (Revenue, Operating Costs) .......................................................................................................... 9 Table 7: Details of QPs Appointed by Sibanye-Stillwater ......................................................... 13 Table 8: Units Definitions .............................................................................................................. 14 Table 9: Technical Experts/Specialists Supporting the QPs ...................................................... 16 Table 10: Kroondal Mining Right Status ..................................................................................... 21 Table 11: Mining Rights Status for the Kroondal Operations (NW 104, 113, 368, 369, 370, 80) ............................................................................................................................... 26 Table 12: Number of Employees ................................................................................................ 29 Table 13: Origin of Employees .................................................................................................... 29 Table 14: Historical Development .............................................................................................. 31 Table 15: Historical Production and Financial Parameters ...................................................... 34 Table 16: Kroondal Operations Evaluation Drilling Costs ......................................................... 51 Table 17: Quality Control Drilling ................................................................................................ 59 Table 18: Summary of the material properties of the dominant hanging wall and footwall rock types .................................................................................................... 65 Table 19: Rock mass classes determined from RMR total ratings and meaning ................... 65 Table 20: Summary of Variogram Model Parameters for all the UG2 Geozones................... 79 Table 21: Kriging Parameters ...................................................................................................... 81 Table 22: Confidence Levels for Key Criteria for Mineral Resource Classification ................. 86 Table 23: Commodity Price and Exchange Rate Assumptions for Cut-off Calculations ...... 88 Table 24: 6E Prill Split Percentages Applied per Reef ............................................................... 89 Table 25: Parameters used in the cut- off calculation for the MR and UG2 Reef .................. 89 Table 26: 4E Cut-off grades calculated for the UG2 Reef and surface operations .............. 90 Table 27: Prill Split of the area covered by Mineral Resource as at 31 December 2021 ....... 90 Table 28: Mineral Resources Exclusive of Mineral Reserves at 100% ....................................... 91 Table 29: Attributable Mineral Resource Exclusive of Mineral Reserves as at 31 December 2021 ......................................................................................................... 91
xiii Table 30: Mineral Resources Inclusive of Mineral Reserves at 100% ........................................ 92 Table 31: Attributable Mineral Resource Inclusive of Mineral Reserves as at 31 December 2021 ......................................................................................................... 92 Table 32: Mineral Resource Inclusive of Mineral Reserves per Mining Area as at 31 December 2021 at 100% ........................................................................................... 95 Table 33: Historical Mining Statistics by Section ........................................................................ 99 Table 34: Mineral Reserve Modifying Factors .......................................................................... 101 Table 35: LoM Plans – Current Operations 2022-2037 ............................................................. 102 Table 36: Prill Split and Recovery for Mineral Reserves ........................................................... 106 Table 37: Mineral Reserve as at 31 December 2021 at 100% ................................................ 107 Table 38: Attributable Mineral Reserve as at 31 December 2021 at 50% ............................. 107 Table 39: Mineral Reserve per Mining Area as at 31 December 2021 at 100% .................... 109 Table 40: Mineral Reserve per Mining Area as at 31 December 2021 at 50% ...................... 109 Table 41: Hoisting Capacities of the Kroondal Shafts ............................................................ 115 Table 42: Major Equipment Quantity Summary ...................................................................... 116 Table 43: Mobile Equipment Summary - 2021 ......................................................................... 117 Table 44: Major Process Equipment ......................................................................................... 117 Table 45: Mineral Processing Plant Parameters ...................................................................... 118 Table 46: K1 Concentrator Production Forecast and Operational Data ............................. 119 Table 47: K2 Concentrator Production Forecast and Operational Data ............................. 125 Table 48: LoM Assessment of Tailings Facilities ........................................................................ 135 Table 49: PGM Demand 2021 .................................................................................................. 140 Table 50: Platinum Supply 2021 ................................................................................................ 141 Table 51: Exchange Rates ........................................................................................................ 143 Table 52: PGM Deck Price Scenarios ....................................................................................... 144 Table 53: Comparison of Mineral Reserve Prices Current and Previous Year ...................... 145 Table 54: Kroondal (104MR) SLP Projects ................................................................................. 147 Table 55: Undertaking and Guidelines .................................................................................... 148 Table 56: HDSA in Management as at the end December 2021 .......................................... 148 Table 57: Breakdown of Employee Profile as at the end December 2021 ........................... 149 Table 58: Employee Turnover ................................................................................................... 149 Table 59: Labour Unavailability and Absenteeism ................................................................. 149 Table 60: Kroondal Total Employees ........................................................................................ 152 xiv Table 61: Kroondal Total Contractors (excluding Ad- Hoc Contractors) ............................. 153 Table 62: Safety Statistics .......................................................................................................... 153 Table 63: Summary of Anticipated Environmental Impacts (revised EMP,2016) ................. 157 Table 64: Kroondal Emissions Inventory 2021 ........................................................................... 164 Table 65: Kroondal Environmental Audits ................................................................................ 172 Table 66: Summary of 2020 Audits for Kroondal ..................................................................... 173 Table 67: Kroondal Material Risks and Action Plans ............................................................... 174 Table 68: Kroondal Compliance to Legislation ....................................................................... 178 Table 69: Future Actions ............................................................................................................ 179 Table 70: Closure Components ................................................................................................ 180 Table 71: Historical and Forecast Capital Expenditure .......................................................... 183 Table 72: Historical and Forecast Operating Costs ................................................................ 185 Table 73: Technical – Economic Model Parameters .............................................................. 187 Table 74: TEM – Mining, Processing, PGM’s Sold and Revenue, Cash Costs, Taxation, Capital Expenditure and Free Cash - 2022-2031 ................................................... 188 Table 75: TEM – Mining, Processing, PGM’s Sold and Revenue, Cash Costs, Taxation, Capital Expenditure and Free Cash - 2032-2037 ................................................... 190 Table 76: TEM – Unit Analysis (ZAR/4Eoz) – 2022-2031 ............................................................. 192 Table 77: TEM – Unit Analysis (ZAR/4Eoz) – 2032-2051 ............................................................. 193 Table 78: NPV (Post-tax) at Various Discount Factors ............................................................ 194 Table 79: Twin Parameter NPV (pre-tax) Sensitivity at a 5% Discount Rate (Revenue, Operating Costs) ...................................................................................................... 195 Table 80: Twin Parameter NPV (Pre-tax) Sensitivity at a 5% Discount Rate (Revenue, Capital Expenditure) ............................................................................................... 195 Table 81: NPV (Post-tax) Relative to ZAR/4Eoz Basket Price at a 5% Discount Rate ............ 195 Table 82: Adjacent Mines/Operations .................................................................................... 196 Table 83: Financial Assessment Accuracy .............................................................................. 197 Table 84: Kroondal - Rustenburg Reserves and LOM Balance .............................................. 198 1 1 Executive Summary 1.1 Introduction Sibanye-Stillwater is an independent international precious metals mining company with a diverse mineral asset portfolio comprising platinum group metals (PGMs) operations in the United States and Southern Africa, gold operations and projects in South Africa, and copper, gold and PGM exploration properties in North and South America. It is domiciled in South Africa and listed on both the Johannesburg Stock Exchange (JSE or JSE Limited) and New York Stock Exchange (NYSE). This Technical Report Summary (TRS) covers Kroondal Operations. The Kroondal Operations are managed by Sibanye- Stillwater under a 50 – 50 Pool and Share Agreement (PSA) with Anglo American Platinum (AAP). The Kroondal Operations fall under the PGM Operations of the Southern African Region of Sibanye Platinum Proprietary Limited, trading as Sibanye–Stillwater Group (Sibanye-Stillwater). The Kroondal Operations include shafts, processing facilities and associated infrastructure (the Material Assets) located in the North West Province, South Africa. This report is the first Technical Report Summary for the Kroondal Operations and supports the disclosure of the Mineral Resource and Mineral Reserve as at 31 December 2021. The Mineral Resource and Mineral Reserve were prepared and reported according to the United States Securities and Exchange Commission's (SEC's) Subpart 1300 of Regulation S-K. There has been no material change to the information between the effective date and the signature date of the Report. The effective date of the Mineral Resource and Mineral Reserve is 31 December 2021 and the Report date is 14 April 2022. 1.2 Property Description, Mineral Rights and Ownership The Kroondal Operations are ongoing, established mines and ore processing plants extracting the UG2 Reef to produce PGMs and base metals. These are in the North West Province, east of the towns of Rustenburg and Kroondal at latitude 25°42’S and longitude 27°20’E. Kroondal Operations are 123km west of Pretoria and 126km northwest of Johannesburg. The most direct routes to Kroondal Operations include the N4 (dual carriage tarred road) from Pretoria or the R512 (regional dual carriage tarred road) from Johannesburg, which intersects with the N4. Kroondal Operations refer to a 50 - 50 Pool and Share Agreement between Sibanye-Stillwater and AAP to mine the Mineral Reserves under an exclusive agreement. Sibanye-Stillwater manages the operation. Kroondal Operations have six Mining Rights (‘MR’) valid from 5 March 2012 to 4 March 2042 totalling approximately 8,148 hectares in the Magisterial Districts of Rustenburg in the North West Province. There are no material legal proceedings in relation to the Kroondal Operations. The Mining Rights referred to in this document are issued in terms of the Mineral and Petroleum Resources Development Act 28 of 2002 in South Africa. The principal terms and conditions are not materially different from other similar operations in South Africa. 2 1.3 Geology and Mineralisation The Bushveld Complex is approximately 2,060 million years old and is a mafic to ultramafic rock sequence. The Rustenburg Layered Suite (RLS) is the world’s largest known mafic igneous layered intrusion. The RLS contains about 80% of the world’s known reserves of Platinum Group Metals (Crowson,2001 quoted in Cawthorn, 2010). In addition to PGM’s, extensive deposits of iron, tin, chromium, titanium, vanadium, copper, nickel, and cobalt also occur. The Bushveld Complex extends approximately 450 km east to west and approximately 250 km north to south. It underlies an area of some 67,000km2, spanning parts of Limpopo, North West, Gauteng, and Mpumalanga Provinces. Interlayered in the Upper Critical Zone of the RLS, the Merensky and Upper Group No.2 Chromitite (UG2) Reefs are preserved as narrow tabular structures. The Kroondal Operations are situated on the western limb of the Bushveld Complex and produce the PGMs and associated Base Metals from the mining and processing of the UG2 Reef. 1.4 Exploration Status, Development, Operations and Mineral Resource Estimates The discovery and development of the reefs in the Rustenburg area can be traced back to 1925. After intense exploration in the Rustenburg area, the first vertical shaft (West vertical) was commissioned in 1928. The Klipfontein Plant (Phase 1) was constructed in 1928. The Kroondal Operations have been extensively evaluated by surface and underground exploration drilling, geophysical surveys (airborne magnetic), trenching and geological mapping over a period of more than 55 years. This intensive exploration has proven the extension of the Merensky and UG2 Reefs to the north-northeast. Initial geological understanding of the area was developed from observations made from the surface and underground mapping, combined with exploration drill hole information and extrapolations of features observed in other platinum mines in the south-western Bushveld Complex. Current interpretations of the geological and structural framework applicable to the UG2 Reef have evolved as new and more detailed geological information and datasets were obtained. There has been a significant decline in surface exploration drilling over the past five years with a limited amount of surface exploration conducted. The Mineral Resource estimation process used at the Kroondal Operations is based on surface and underground drill holes as well as underground channel samples. The most fundamental control of the PGM mineralization is rock chemistry. PGMs are associated with thin (1-5m) chromitite layers and base metals sulphides. These layers are distinct and consistent over large distances. The Mineral Resources declared are estimated based on the geological facies and constrained by appropriate geostatistical techniques, using Ordinary Kriging for areas with sufficient data and ID2 (Inverse distance to the power of two) estimates for areas with limited data. The Mineral Resource classification follows geostatistical and geological guidelines. The Mineral Resources are declared inside the structural blocks and outside of the mined-out areas. All Mineral Resources reported are considered
3 to be of sufficient quality to justify a reasonable potential for potential economic extraction. The underlying grade control and reconciliation processes are considered appropriate. The facies and structural models that form the basis of this report have evolved. The Mineral Resources are in-situ estimates of tonnage and grades reported at a minimum mining width of 200cm, with applicable mechanised bord and pillar mining methods as employed at the Operation. 4 Table 1: Attributable Mineral Resource Exclusive of Mineral Reserves as at 31 December 2021 2021 Classification – 3PGE+AU Tonnes (Mt) 4E Grade (g/t) 4E (Moz) Pt Pd Rh Au Pt Pd Rh Au Dec 21 Dec 20 Dec 21 Dec 20 Dec 21 Dec 20 (g/t) (g/t) (g/t) (g/t) (Moz) (Moz) (Moz) (Moz) Underground Measured (AI) 15.8 17.0 3.4 3.4 1.7 1.9 15.8 17.0 3.4 3.4 1.7 1.9 15.8 17.0 Measured (BI) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Indicated (AI) 4.8 4.7 3.8 3.8 0.6 0.6 4.8 4.7 3.8 3.8 0.6 0.6 4.8 4.7 Indicated (BI) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Measured and Indicated 20.5 21.8 3.5 3.5 2.3 2.4 20.5 21.8 3.5 3.5 2.3 2.4 20.5 21.8 Inferred (AI) 2.5 2.5 3.0 3.0 0.2 0.2 2.5 2.5 3.0 3.0 0.2 0.2 2.5 2.5 Inferred (BI) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Underground 23.0 24.2 3.4 3.4 2.5 2.7 23.0 24.2 3.4 3.4 2.5 2.7 23.0 24.2 Total (AI) 23.0 24.2 3.4 3.4 2.5 2.7 23.0 24.2 3.4 3.4 2.5 2.7 23.0 24.2 Total (BI) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Surface Tailings Facility Measured Open-pit7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Surface 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Resource 23.0 24.2 3.4 3.4 2.5 2.7 23.0 24.2 3.4 3.4 2.5 2.7 23.0 24.2 1. Mineral Resources are not Mineral Reserves. 2. Mineral Resources have been reported in accordance with the classification criteria of Subpart 1300 of Regulation S-K. 3. Attributable Mineral Resources is 50.00% of the total Mineral Resource. 4. Mineral Resource is calculated on available blocks. Due to non-selective mining, no cut-off grade is applied. 5. AI = Above Infrastructure; BI = Below Infrastructure 6. Mineral Resources Reported after the removal of Geological losses. 7. Quantities and grades have been rounded to one decimal place; therefore minor computational errors may occur. Values<0.05Moz report as zero due to rounding. 5 Table 2: Attributable Mineral Resource Inclusive of Mineral Reserves as at 31 December 2021 2021 Classification – 4E Tonnes (Mt) 4E Grade (g/t) 4E (Moz) Pt Pd Rh Au Pt Pd Rh Au Dec 21 Dec 20 Dec 21 Dec 20 Dec 21 Dec 20 (g/t) (g/t) (g/t) (g/t) (Moz) (Moz) (Moz) (Moz) Underground Measured (AI) 26.8 30.7 3.3 3.3 2.8 3.3 26.8 30.7 3.3 3.3 2.8 3.3 26.8 30.7 Measured (BI) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Indicated (AI) 4.8 4.7 3.8 3.8 0.6 0.6 4.8 4.7 3.8 3.8 0.6 0.6 4.8 4.7 Indicated (BI) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Measured and Indicated 31.6 35.5 3.4 3.4 3.4 3.8 31.6 35.5 3.4 3.4 3.4 3.8 31.6 35.5 Inferred (AI) 2.5 2.5 3.0 3.0 0.2 0.2 2.5 2.5 3.0 3.0 0.2 0.2 2.5 2.5 Inferred (BI) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Underground 34.0 37.9 3.3 3.3 3.7 4.1 34.0 37.9 3.3 3.3 3.7 4.1 34.0 37.9 Total (AI) 34.0 37.9 3.3 3.3 3.7 4.1 34.0 37.9 3.3 3.3 3.7 4.1 34.0 37.9 Total (BI) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Surface Open Cast Measured Open -Pit7 1.0 1.3 4.3 3.7 0.1 0.2 1.0 1.3 4.3 3.7 0.1 0.2 1.0 1.3 Total Surface 1.0 1.3 4.3 3.7 0.1 0.2 1.0 1.3 4.3 3.7 0.1 0.2 1.0 1.3 Total Resource 35.0 39.3 3.4 3.3 3.8 4.2 35.0 39.3 3.4 3.3 3.8 4.2 35.0 39.3 1. Mineral Resources are not Mineral Reserves. 2. Mineral Resources have been reported in accordance with the classification criteria of Subpart 1300 of Regulation S-K. 3. Attributable Mineral Resources is 50.00% of the total Mineral Resource. 4. Mineral Resource is calculated on available blocks. Due to non-selective mining, no cut-off grade is applied. 5. AI = Above Infrastructure; BI = Below Infrastructure 6. Mineral Resources Reported after the removal of Geological losses. 7. Quantities and grades have been rounded to one decimal place; therefore minor computational errors may occur. Values<0.05Moz report as zero due to rounding. 6 1.5 Mining Methods, Ore Processing, Infrastructure and Mineral Reserves Kroondal Operations are large, established shallow level mechanised PGM mines in the Bushveld Complex accessed from surface utilizing decline systems. There are five access tunnels with the same decline systems. The mining method applied at all Kroondal Operations is mechanised bord and pillar. There are however a few sections where handheld drill and blast operations take place. All the permanent infrastructure required to access and mine is already established and in use. Detailed LoM plans for every shaft complex at Kroondal support the Mineral Reserve presented in Table 3 All mine designs, as well as strategic planning and major design issues, such as shaft pillar extraction, are done in conjunction with input from qualified rock engineers. The mining methods employed are designed based on geotechnical engineering inputs bearing in mind the mining width, depth of mining and geology. Mine design is done in line with the mine and stability pillar design applicable to the area. Payability, stability pillars and geological features determine the extraction ratio, which will vary with depth across the mine. The LoM production plans for Kroondal Operations were developed through a Mineral Resource to Mineral Reserve conversion process that utilised dilution factors and mining (stoping and development) parameters as well as other modifying factors, informed by historical reconciliation results and performance. The use of factors aligned to historical performance enhances the likely achievability of the plans. Economic viability testing of the LoM plans demonstrated that extraction of the scheduled Indicated and Measured Mineral Resources is economically justified, and the declaration of Mineral Reserves is appropriate. All fresh ore from the Kroondal shafts are delivered to a dense media separation (DMS) plant which is designed to remove excess waste material through a density flotation process, before being treated by the mineral processing facilities at the Kroondal Operations, which are located at two sites, K1 concentrator adjacent to Kopaneng shaft and K2, adjacent to Bambanani shaft. Both mineral processing plants are operated and maintained under contract by Minopex, a contract processing firm. K1 Plant was commissioned in October 1999 and K2 was commissioned in April 2005. Both plants are still in good condition. As the production profile declines, the plant will be scaled down in line with the expected fresh ore supply. There is adequate storage capacity for the tailings resulting from ore processing at the processing facility, and the Tailings Storage Facilities are in good condition.
7 Table 3: Attributable Mineral Reserve as at 31 December 2021 2021 Classification - 4E PGM Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Pt Pd Rh Au Pt Pd Rh Au Dec 21 Dec 20 Dec 21 Dec 20 Dec 21 Dec 20 (g/t) (g/t) (g/t) (g/t) (Moz) (Moz) (Moz) (Moz) Underground Proved 9.6 12.0 2.5 2.6 0.8 1.0 1.5 0.8 0.3 0.0 0.5 0.2 0.1 0.0 Probable 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Underground 9.6 12.0 2.5 2.6 0.8 1.0 1.5 0.8 0.3 0.0 0.5 0.2 0.1 0.0 Surface Stockpiles Proved Open-pit 0.8 0.8 3.3 3.3 0.1 0.1 1.9 1.0 0.3 0.0 0.1 0.0 0.0 0.0 Probable Open-pit 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Surface 0.8 0.8 3.3 3.3 0.1 0.1 1.9 1.0 0.3 0.0 0.1 0.0 0.0 0.0 Total Proved 10.4 12.9 2.6 2.6 0.9 1.1 1.5 0.8 0.3 0.0 0.5 0.3 0.1 0.0 Total Probable 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Reserve 10.4 12.9 2.6 2.6 0.9 1.1 1.5 0.8 0.3 0.0 0.5 0.3 0.1 0.0 1. Mineral Reserve was reported in accordance with the classification criteria of Regulation S-K 1300. 2. Mineral Reserve was estimated on all available blocks and no cut-off grade was applied. 3. Attributable Mineral Reserve is 50.00%. 4. Where Au grade is less than 0.05g/t the value will reflect as zero(0) in the table 5. Values<0.05Moz report as zero due to rounding. 6. Mineral Reserves are estimated using the prices in Section 16.4. 7. The average recovery factor for the UG2 is 83%. 8 1.6 Capital and Operating Cost Estimates and Economic Analysis The LoM plans for Kroondal provide for appropriate Capital Expenditure budgets to cater for the sustainability of the operation. Sustaining capital costs are benchmarked to historical Capital Expenditure. The forecast Operating Costs included in the LoM plans are based on historical experience at the operations and a price risk of +/- 10% of the Basket price. All Capital Expenditure and Operating Cost estimates have been estimated to a maximum of +/-20% accuracy. Contingency for Operating Costs is 4%. The budgeted Capital Expenditure and Operating Costs forecast metal prices and other economic assumptions utilised for economic viability testing of the LoM plans are reasonable. The post-tax flows for Kroondal derive the Discounted cash-flow (DCF), which results in the Net Present Values (NPVs)of the LoM plan contained in Table 4 at Discount Rate as at 31 December 2021, of 5%. The table also indicates the sensitivity of the NPV to the long-term 4E PGM commodity price. Table 4: NPV (Post-tax) Relative to ZAR/4Eoz PGM Basket Prices at 5% Discount Rate Long Term Price (ZAR/4Eoz) (ZARm) Sensitivity Range -20% -10% -5% 29,746 5% 10% 20% NPV@ the base case Discount Rate 5% (ZARm) 4,746 11,145 14,344 17,543 20,742 23,941 30,340 Table 5 shows two-variable sensitivity analysis of the NPV Post-Tax to variance in Capital costs at the 5% Discount Rate. Table 6 shows two-variable sensitivity analysis of the NPV Post-Tax to variance in Revenue and in Operating cost at the 5% Discount Rate. This demonstrates sensitivity to the increase in operating costs and the leverage potential to higher 4E PGM prices. Table 5: Twin Parameter NPV (Post-Tax) Sensitivity at 5% Discount Rate (Capital Costs) Post-Tax NPV@5% (ZARm) Revenue Sensitivity Range -20% -10% -5% 0% 5% 10% 20% Total Capital Cost Sensitivity Range -20% 4,999 11,398 14,597 17,796 20,996 24,195 30,593 -10% 4,873 11,271 14,470 17,670 20,869 24,068 30,466 -5% 4,809 11,208 14,407 17,606 20,806 24,005 30,403 0% 4,746 11,145 14,344 17,543 20,742 23,941 30,340 5% 4,683 11,081 14,280 17,480 20,679 23,878 30,276 10% 4,619 11,018 14,217 17,416 20,615 23,815 30,213 20% 4,493 10,891 14,090 17,290 20,489 23,688 30,086 9 Table 6: Twin Parameter NPV (Post-Tax) Sensitivity at 5% Discount Rate (Revenue, Operating Costs) Post-Tax NPV@5% (ZARm) Revenue Sensitivity Range -20% -10% -5% 0% 5% 10% 20% Total Operating Cost Sensitivity Range -20% 12,483 18,881 22,081 25,280 28,479 31,678 38,077 -10% 8,615 15,013 18,212 21,411 24,611 27,810 34,208 -5% 6,680 13,079 16,278 19,477 22,676 25,876 32,274 0% 4,746 11,145 14,344 17,543 20,742 23,941 30,340 5% 2,812 9,210 12,409 15,609 18,808 22,007 28,406 10% 878 7,276 10,475 13,674 16,874 20,073 26,471 20% (2,991) 3,408 6,607 9,806 13,005 16,204 22,603 While the profitability of the entire operation is tested on a total cost basis, the point at which each individual shaft closure is determined, is after direct operational cost. As soon as a shaft does not contribute to its own mining and operational cost, it is closed. The direct allocated costs include the overheads specific to the operation while indirect allocated costs refer to those items which belong to the entire group, and which are allocated back to each operation based on a formula. 1.7 Permitting Requirements The Kroondal Operations have all the necessary rights and approvals in place to operate, e.g., mining, processing, TSFs, and ancillary facilities associated with the operations. Any permit and license infringements are corrected as they occur, and environmental impacts are managed in close consultation with the appropriate departments. The operator’s tenure to operate on these premises is secure for the foreseeable future unless terminated by regulatory authorities for legally justified reasons. Furthermore, based on the assessment of the current permits, technical submittals, regulatory requirements and compliance history, continued acquisition of permit approvals should be possible and there is a low risk of rejections of permit applications by the regulator for the foreseeable future. 1.8 Conclusions and Recommendations The Qualified Persons have conducted a comprehensive review and assessment of all material issues likely to influence the future activities of Kroondal Operations based on information available up to 31 December 2021. There is a comprehensive Risk Register that is reviewed quarterly. All the risks have detailed mitigation plans designed to reduce the risk to a manageable level. The Qualified Persons could not identify any unmanaged material risks that would affect the Mineral Resources and Mineral Reserves reported for Kroondal Operations. The views expressed in this report were based on the fundamental assumption that the required management resources and proactive management skills will be focused on meeting the LoM plans and production targets. There are no recommendations for additional work or changes. 10 2 Introduction 2.1 Registrant Sibanye-Stillwater Limited is an independent international precious metals mining company with a diverse mineral asset portfolio comprising platinum group metal (PGM) operations in the United States and Southern Africa, gold operations and projects in South Africa, and copper, gold and PGM exploration properties in North and South America. It is domiciled in South Africa and listed on both the Johannesburg Stock Exchange (JSE or JSE Limited) and New York Stock Exchange (NYSE). This Technical Report Summary covers Kroondal Operations. The Kroondal Operations are managed by Sibanye- Stillwater under a 50 – 50 Pool and Share Agreement (PSA) with Anglo American Platinum(AAP). The Kroondal Operations fall under the PGM Operations of the Southern African Region of Sibanye Platinum Proprietary Limited, which is a wholly-owned subsidiary of Sibanye–Stillwater Group (Sibanye-Stillwater) (Figure 1). The Kroondal Operations include shafts, processing facilities and associated infrastructure (the Material Assets) located in the North West Province, South Africa.
11 Figure 1: Ownership and Company Structure for the Kroondal Operations 100% 100% 100% 100% 50% 100% Kroondal Operations (South Africa) Proprietary Limited Sibanye Platinum Proprietary Limited Sibanye Stillwater Limited Sibanye Gold Limited Sibanye Platinum Bermuda Proprietary Limited Kroondal (PSA 1) Kroondal Platinum (SA) Proprietary Limited Rehabilitation 12 2.2 Compliance Sibanye-Stillwater is listed on the NYSE (Code SBSW) and JSE (Code SSW). Mineral Resources and Mineral Reserves contained in this Technical Report Summary were compiled and reported following the United States Securities and Exchange Commission's (SEC's) Subpart 1300 of Regulation S-K. 2.3 Terms of Reference and Purpose of the Technical Report Summary This Technical Report Summary reports the Mineral Resources and Mineral Reserves for Sibanye- Stillwater’s Kroondal Operations as at 31 December 2021. The Kroondal Operations are an ongoing, established mine extracting platinum group metals (PGM) from the Upper Group No. 2 Chromitite Seam (UG2 Reef) of the Bushveld Complex. It also extracts chrome and base metals (Ni and Cu) as a by- product. The ore produced is processed onsite and produces concentrate. The concentrate is further beneficiated by AAP, a refinery in Rustenburg. This report is the first Technical Report Summary for the Sibanye-Stillwater Kroondal Operations prepared under the SEC's Subpart 1300 of Regulation S-K disclosure requirements. The PGM-rich layers mined are well known from extensive mining which has taken place, at Rustenburg and the greater Bushveld Complex, over the last 90 years. The Mineral Resource for Kroondal Operations contained in this Technical Report Summary is estimated from the extensive surface and underground drill hole database and signed-off by internal Qualified Persons (QPs). These Mineral Resources are the basis for the Mineral Reserve estimates reported for the operation. Furthermore, the Mineral Reserve estimates are based on detailed Life of Mine (LoM) plans and technical studies (at least to a Prefeasibility Study level) completed internally by Sibanye-Stillwater personnel utilizing modifying factors and Capital and Operating Costs informed by the historical performance at the operations. This Technical Report Summary was compiled by in-house QPs for Mineral Resources and Mineral Reserves appointed by Sibanye-Stillwater (Table 7). The QPs are Technical Experts/Specialists registered with professional bodies that have enforceable codes of conduct. A list of the QPs, their role, Qualifications and sections which they have prepared is given in Table 7. 13 Table 7: Details of QPs Appointed by Sibanye-Stillwater Name Position Area of Responsibility Academic and Professional Qualifications Section Sign- off Andrew Brown Vice President: Mine Technical Services Qualified Person, Mineral Resources and Mineral Reserves – SA PGM Operations MSc Mining Engineering; FSANIRE F037 MSAIMM 705060 1-6, 15 Manie Keyser Senior Manager Mine Planning and Resource Management Qualified Person, Mineral Resources and Mineral Reserves – SA PGM Operations MEng Mining Engineering, GDE, NHD MRM, ND Survey SACNASP 400284/06 13,16, 17.1-17.4, , 20-25 Nicole Wansbury Unit Manager Geology Mineral Resources Qualified Person Mineral Resources – SA PGM Operations MSc Geology SACNASP 400060/11 GSSA No 965108 1.4,7-11 Brian Smith Unit Manager Survey Qualified Person Mineral Reserves – SA PGM Operations MEng MRM SAGC GPr MS 0218 1.5, 12 Stephan Botes Unit Manager – Surface and Mineral Rights Mineral Title LLB, LLM, Postgraduate Certificate in Prospecting and Mining Law, Postgraduate Certificate in Company Law I, Admitted Attorney of the High Court of RSA 1.7, 3.2,3.4 Mandy Jubileus Environmental Manager SA PGM Environmental Compliance MSc Environmental Management and Sciences , SACNASP 118956, SAATCA ISO14001 Lead Auditor E2167 17.5 Dewald Cloete SVP Processing Mineral Processing ND , NHD Extractive Metallurgy, HD0968 SAIMM 14 Roderick Mugovhani SVP Finance Financial Evaluation B,Comm Accounting, Post Graduate Diploma in Acc Education, MBA, Executive Management Programme, Certified Professional Accountant( SA. Management Development Programme ( MDP) 1.6, 18, 19 SAIMM - South African Institute of Mining and Metallurgy SACNASP – South Africa Council for Natural Scientific Professions SAGC – South African Geomatics Council GSSA – Geological Society of South Africa SAATCA – South African Auditor and Training Certification Authority 14 2.4 Sources of Information Sibanye-Stillwater Kroondal Operations and Sibanye-Stillwater (the registrant) provided most of the technical information utilised to prepare this report. This information is contained in various technical studies undertaken in support of the current and planned operations, historical geological work and production performance at the Kroondal Operations and forecast economic parameters and assumptions. Other supplementary information was sourced from the public domain and these sources are acknowledged in the body of the report and listed in the References Section (Section 25). 2.5 Site Inspection by QPs The QPs for Mineral Resources and Mineral Reserves who authored this Technical Report Summary and the supporting Technical Experts/Specialists are all employees of Sibanye-Stillwater working at the Kroondal Operations. By virtue of their employment, the QPs visit the Kroondal Operations regularly while carrying out their normal duties. 2.6 Units, Currencies and Survey Coordinate System In the Republic of South Africa (RSA), metric units are used for all measurements and, therefore, the reporting of quantities is in metric units unless otherwise stated. All the metal prices and costs are quoted in US Dollars (USD) or South Africa Rand (ZAR). An exchange rate of 15.00ZAR/USD is used in this document. The coordinate system employed for most of the surface and underground surveys and maps shown in this report is based on the Gauss Conform Projection (UTM), Hartebeeshoek 94 Datum, Ellipsoid WGS84, Central Meridian WG27 (Y +0; X+2,800,000). Some regional-scale maps in this report may be referenced with Latitude and Longitude coordinates for ease of reading. Units of measurement used in this report are described in Table 8. Table 8: Units Definitions Units Description cm centimetre(s) g gram(s), measure of mass g/cm3 density - grams per cubic centimetre g/t grade grams per tonne ha hectares = 100m x 100m kg kilograms = 1000 grams, measure of mass km kilometre(s) = 1000 metres km2 square kilometres, measure of area Koz/kozt kilo ounces= 1000 ounces (troy) kt kilotonnes ktpm kilotonnes per month
15 Units Description litre Metric unit of volume = 1000cm3 m metre(s) m2 square metres m3/a cubic metres per annum mamsl elevation metres above mean seal level metre metric unit of distance mm millimetre(s) = metre/1000 Moz Million ounces (troy), measure of weight Mt Million metric tonnes Mtpa Million tonnes per annum MVA Million Volt-Amps(Watts) MW Megawatts oz Troy ounces = 31.1034768 grams ppb parts per billion ppm parts per million (grams/metric tonne) sec second t metric tonne = 1000 kilograms = 1.10231131 short ton tonnes metric tonnes = 1000 kilograms = 1.10231131 short ton USD United States Dollars 4Eoz troy ounces of Platinum, Palladium, Rhodium and Gold combined. lb pound USA = measure of weight WGS84 World Geographic System 1984- map projection system wt% weight percent ZAR South African Rand ZARm Million Rand 2.7 Reliance on Information Provided by Other Experts The QPs for Mineral Resources and Mineral Reserves have sought input from in-house Technical Experts/Specialists on aspects of the modifying factors for the disciplines outside their expertise. Kroondal is a large operation, and it is not possible for any one person to have the required expertise to comment on all aspects of the operation and inputs to the Mineral Resources and Mineral Reserves. Kroondal and Sibanye-Stillwater employ a large team of Technical Experts and Services Specialists. The QPs consider it reasonable to rely upon the information provided by these experts by virtue of their role in the 16 company. A list of the in-house Technical Experts/Experts and their areas of competency are summarized in Table 9. Table 9: Technical Experts/Specialists Supporting the QPs Name Position Area of Competency Academic Qualifications R Craill Vice President: Engineering Infrastructure B. Eng Mechanical. Pr Eng R Cooper Vice President Tailings Engineering Tailings BSc Civil Engineering, GDE (Civil), Pr Eng S Durapraj Manager: Rock Engineering Rock Engineering B.A, MSc Mining Engineering, MSANIRE, AREC, COMRMC L Koorsse Unit Manager Survey Survey, Reporting and Historical Mining Factors MSCC, NHD MRM, ND Survey IMSSA PMS0134 G Mackenzie Manager: Human Resources Human Resources Management Nat Dipl. HRM. Adv. IR E Malherbe Superintendent Geology Mineral Resource Estimation BSc (Hons) (Geology) SACNASP 400131/08 T Naude Unit Manager: Environment Rehabilitation and closure costs BA Geography and Environmental Studies M Neveling Senior Manager: Health and Safety Safety MO COC, MMDP, Ncert Safety H Olivier Manager Asset Management Equipment B. Eng. Mechanical (Hons), GCC: Mines & Works (5999) K Pillay EVP: Sales and Marketing Metal sales and Marketing BSc Eng (Chem), MSc Eng (Chem), MBA. T Phumo Executive Vice President (EVP): Stakeholder Relations (SA) Social and Labour BA Hons (Corp Comm), APR Diploma Project Management S Swanepoel Manager Occupational Hygiene and Ventilation Occupational Hygiene, Ventilation BSc (Hons), MSc, MEC, NDSM, SAIOH (0309) 3 Property Description 3.1 Location and Operations Overview The Kroondal Operations are located in the North West Province, east of the towns of Rustenburg and Kroondal at latitude 25°42’S and longitude 27°20’E. Kroondal Operations are 123 km west of Pretoria and 126 km northwest of Johannesburg (Figure 2). 17 Figure 2: General Location of the Material Assets Rustenburg town is surrounded by agricultural land. The Kroondal Operations are situated to the southeast of Rustenburg town. Various mines owned by Impala Platinum, Glencore and Royal Bafokeng are also located in and around Rustenburg. Refer to Figure 3 for maps providing additional location details of the Kroondal Operations. 18 The Kroondal Operations include shafts Figure 3, integrated processing facilities (Figure 4) and associated infrastructure (the “Material Assets”) located in the Northwest Province, South Africa. This TRS for the Kroondal Operations reports the Mineral Resources and Mineral Reserves as at 31 December 2020. Kroondal Operations include • Mining units utilising five operating shafts and an open-pit operation: o Kwezi Shaft and K6 Shaft (Kroondal West), o Simunye Shaft, Bambanani Shaft and Kopaneng Shaft (Kroondal East), and o An open-pit operation – Klipfontein, adjacent to the Kroondal East complex. • Two Mineral Processing Plants: o K1 Plant and o K2 Plant. • Other infrastructure is necessary for the production of saleable products and for compliance with environmental, health, safety, and social laws and regulations. The Mineral Resource is accessed from the surface using decline systems and bord and pillar mining method. The average mining depths at Kwezi and K6 Shafts are 300m and 250m below surface, respectively. At Simunye Shaft, the lowest mining level is currently 550 m below surface and at Bambanani Shaft, the current lowest mining level is 450 m below surface, whilst at Kopaneng Shaft, it is 500 m below surface. The location of the shafts is shown in Figure 3.
19 Figure 3: Kroondal Operations 20 3.2 Mineral Title The Mining and Prospecting rights referred to in this document are issued in terms of the Mineral and Petroleum Resources Development Act 28 of 2002 in South Africa. The principal terms and conditions are not materially different to other similar rights within South Africa. Mining Rights for the Kroondal Operations are held by Rustenburg Platinum Mines Ltd and Kroondal Operations (Pty) Ltd, as shown in Table 10. The Mining Rights held by Kroondal Operations (Pty) Ltd and Rustenburg Platinum Mines Ltd authorizes Kroondal to mine Platinum Group Metals and, in the case of NW30/5/1/2/2/113 MR, Chrome, Copper, Nickel and Gold in addition to PGM’s. A summary of the Mining Rights for Kroondal is given in Table 10. A list of farms comprising the Mineral Rights is given in Table 11. Surface rights have various owners. The Kroondal Operations have sufficient rights and access to land to conduct operations. The details of the Mining Rights are in Figure 4. Kroondal Operations (Pty) Ltd holds one New Order Mining Right and 4 Converted Mining Rights in terms of the provisions of the MPRDA, whereas Rustenburg Platinum Mines Ltd is the holder of one converted Mining Right. Each of the rights has its own commencement and expiry dates (Table 10). 21 Table 10: Kroondal Mining Right Status Right Holder Right Number/s Size (ha) Minerals Key Permit Conditions Expiry date Future Requirements Future Intentions Brief summary of Violations/fines Kroondal Operations (Pty) Ltd NW30/5/1/2/2/104MR 1,722.20 PGMs See the summary of permit conditions, general EMP regulatory reporting requirements and SLP regulatory reporting requirements. 06-Oct-22 Renewal application to be submitted. To apply for a renewal of the MR. None. Kroondal Operations (Pty) Ltd NW30/5/1/2/2/113MR 2,508.00 PGMs, (Gold, Nickel, Copper, Chrome in UG2) See the summary of permit conditions, general EMP regulatory reporting requirements and SLP regulatory reporting requirements. 06-Oct-22 Renewal application to be submitted. To apply for a renewal of the MR. None. Kroondal Operations (Pty) Ltd NW30/5/1/2/2/368MR 265.92 PGMs See the summary of permit conditions, general EMP regulatory reporting requirements and SLP regulatory reporting requirements. 04-Mar-42 Submit application in terms of section 102 for ministerial consent to incorporate the area into SRPM Mining Right. To include area into a single consolidated mining right together with the rest of the Kroondal MRs and SRPM MR None. 22 Right Holder Right Number/s Size (ha) Minerals Key Permit Conditions Expiry date Future Requirements Future Intentions Brief summary of Violations/fines Kroondal Operations (Pty) Ltd NW30/5/1/2/2/369MR 409.21 PGMs See the summary of permit conditions, general EMP regulatory reporting requirements and SLP regulatory reporting requirements. 04-Mar-42 Submit application in terms of section 102 for consent to incorporate area into SRPM Mining Right. To include area into a single consolidated mining right together with the rest of the Kroondal MRs and SRPM MR. None. Kroondal Operations (Pty) Ltd NW30/5/1/2/2/370MR 32.55 PGMs See the summary of permit conditions, general EMP regulatory reporting requirements and SLP regulatory reporting requirements. 11-Mar-42 Submit application in terms of section 102 for consent to incorporate area into SRPM Mining Right. To combine into a bigger mining right with the rest of the Kroondal MRs and SRPM None. Rustenburg Platinum Mines (Anglo owned) PSA Mining Area NW30/5/1/2/2/80 MR 3,212.93 PGMs and associated minerals See the summary of permit conditions, general EMP regulatory reporting requirements and SLP regulatory reporting requirements. 28-Jul-40 Is there any outstanding regulatory aspects that need to be addressed in relation to the right. For example: outstanding applications at the DMRE, registration of amendments at the MPTRO, amendment of EA's, water use licenses etc. None
23 Key permit conditions are given below; 1. Mining right renewal applications to be submitted 60 working days prior to the date of expiry of the right. 2. Holder of MR must continue with mining operations, failing which the right may be suspended or cancelled. 3. The terms of the right may not be varied or amended without the consent of the Minister of Mineral Resources and Energy. 4. The Holder shall be entitled to abandon or relinquish the right or the area covered by the right entirely or in part. Upon abandonment or relinquishment, the Holder must: 4.1. Furnish the Regional Manager with all prospecting and/or mining results and/or information, as well as the general evaluation of the geological, geophysical and borehole data in respect of such abandoned area; and 4.2. Apply for a closure certificate in terms of section 43(3) of the MPRDA. 5. The holder shall pay royalties to the State in accordance with section 25(2)g of the MPRDA throughout the duration of the mining right. 6. Mining Operations must be conducted in accordance with the Mining Work Programme and any amendment to the MWP and an approved EMP. 7. The holder shall not trespass or enter into any homestead, house or its curtilage nor interfere with or prejudice the interests of the occupiers and/or owners of the surface of the Mining Area except to the extent to which such interference or prejudice is necessary for the purposes of t enabling the Holder to properly exercise the Holder’s rights under the mining right. 8. The holder must dispose of all minerals derived from mining at competitive market prices which shall mean in all cases, non-discriminatory prices or non-export parity prices. 9. A shareholding, an equity, an interest or participation in the mining right or joint venture, or a controlling interest in a company/JV may not be encumbered, ceded, transferred, mortgaged, let, sublet, assigned, alienated or otherwise disposed of without the written consent of the Minister, except in the case of a change of controlling interest in listed companies. 10. All boreholes, shafts, adits, excavations and openings created by the holder shall be sealed, closed, fenced and made safe in accordance with the approved Environmental Management Programme and the Mine Health and Safety Act. 11. The holder of the mining right, while carrying out mining operations should safeguard and protect the environment, the mining area and any person using to entitled to use the surface of the mining area for possible damage or injury. 24 12. The Minister or a person authorized by the Minister shall be entitled to inspect the Mining Area and the execution of the approved mining right conditions. 13. A mining right may be cancelled or suspended subject to S47 of the MPRDA if the holder: 13.1. Submits inaccurate, incorrect and/or misleading information in connection with any matter required to be submitted under this Act; 13.2. Fails to honour or carry out any agreement, arrangement or undertaking, including the undertaking made by the Holder in terms of the Broad-Based Socio-Economic Empowerment Charter and Social and Labour Plan; 13.3. Breaches any material term and condition of the mining right; 13.4. Conducts mining in contravention of the MPRDA; 13.5. Contravenes the requirements of the approved Environmental Management Programme; 13.6. Contravenes any provisions of this Act in any other manner. 14. The holder shall submit monthly returns contemplated in S 28 (2) A of the MPRDA no later than the 15th of every month and maintain all such books, plans and records in regard to mining on the mining area as may be required by the Act. 15. The Holder shall, at the end of each year, following commencement of this mining right, inform the Regional Manager in writing of any new developments and of the future mining activities planned in connection with the exploitation/mining of the minerals in the mining area. 16. Provisions relating to section 2(d) and section 2(f) of the MPRDA, relating to the Broad-Based Socio- Economic Empowerment Charter, differs in each mining right. 17. The Mining right does not exempt the holder from complying with the MHSA or any Act in South Africa. 18. Annually, no later than three months before financial year end, submit a detailed implementation plan to give effect to Regulation 46(e)(i), (ii) and (iii) in line with the Social and Labour Plan. 19. Annually, no later than three months after the finalization of its audited annual report submit a detailed report on the implementation previous year’s SLP. SLP COMPLIANCE REQUIREMENTS 20. New Social and Labour Plan to be submitted and reviewed every 5 years. 21. Social and Labour Plan Implementation Plans to be submitted annually. 22. Social and Labour Plan Annual Report to be submitted annually. 25 ENVIRONMENTAL MANAGEMENT COMPLIANCE REQUIREMENTS 23. Performance assessment relating to Environmental Management Programme to be conducted Bi- annually. 24. Performance assessment relating to Water Use License to be conducted annually. 25. Performance assessment relating to Atmospheric Emission License to be conducted annually. Figure 4: Plan Showing Kroondal Mineral Right and Shafts 26 Table 11: Mining Rights Status for the Kroondal Operations (NW 104, 113, 368, 369, 370, 80) Farm Name Farm Portion Magisterial District Kroondal 304 Portions 2,4,6,8,9,10,22,23,24,25,25,21, Portion 83 Portion 84 RE Portion 85 Portion 99 Portion 85 Portion 95 Portion 93 Portion 91 RE Portion 92 RE Portion 94 Portion 151 (a Portion of Portion 94) Portion 158 Portion 129 (a Portion of Portion 85) Portion 157 (a Portion of Portion 85) Portion 52 Rustenburg
27 3.3 Royalties Sibanye-Stillwater Kroondal Operations is not a royalty company nor receives royalties from any other operation. 3.4 Legal Proceedings and Significant Encumbrances to the Property The QPs have been advised by Sibanye-Stillwater that there are no material legal proceedings in relation to the Kroondal Operations. It should, however, be noted that Sibanye-Stillwater may be involved in various non-material legal matters such as employment claims, third-party subpoenas and collection matters on an ongoing basis, which are not material to the Mineral Resources and Mineral Reserves for the Kroondal Operations reported in this Technical Report Summary. From the documentation reviewed and input by the relevant Technical Specialists and Experts, the QPs could not identify any significant factors or risks with regards to the title permitting, surface ownership, environmental and community factors that would prevent the mining and the declaration and disclosure of the Mineral Resources and Mineral Reserves for the Kroondal Operations. The Kroondal Operations comply with all title and environmental permitting requirements of the RSA. 4 Accessibility, Climate, Local Resources, Infrastructure and Physiography 4.1 Topography, Elevation and Vegetation The Rustenburg area within which the Kroondal Operations are situated is characterised by undulating terrain, varying between 1,050m above mean sea level (mamsl) and 1,180 mamsl. The topography to the north, west and east of Kroondal Operations is dominated by well-established non-perennial watercourses. The topography for the mine area is relatively flat, with sporadic hillocks and rocky outcrops. To the south of the mine area is the Magalies mountain range and to the east is a number of small hills. The major rivers in the Kroondal Operations area include the Hex River bisecting through the western and central sections of the licence area and the Sterkstroom River on the eastern perimeter. The natural vegetation comprises open grasslands and shrubs, but most of the area surrounding Rustenburg has been and is to a certain extent still used for agriculture developments, in particular sunflowers and tobacco. With the growth in the mining sector due to extensive platinum and chrome deposits in the region, agriculture is on the decline. Urban development has taken place mainly in the town of Rustenburg, but informal settlements also exist, including in the Rustenburg Operations Lease Area. The licence area comprises two primary vegetation types, namely: • Clay Thorn bushveld/ Other Turf Thornveld o This veld type occurs on the black vertic clay soils of the flat plains of the North West and Northern Provinces. Acacia tortilis, Acacia karroo and Acacia nilotica dominate the tree layer within this vegetation type. The Clay Thorn Bushveld is the main veld type found within the Rustenburg Operations area. 28 • Mixed Bushveld o This veld type is very variable depending on soil type, soil depth and aspect, and is represented by many different plant communities and habitat types. It occurs mainly on the undulating to flat plains of the Northern and North-West Provinces. The soil is mostly shallow, sandy, sometimes coarse and gravelly, overlying granite, quartzite, sandstone or shale. The vegetation may vary from short, dense, sometimes shrubby bushveld to tall, open tree savanna. Mixed Bushveld occurs in small parts of the Rustenburg Operations licence area. 4.2 Access, Towns and Regional Infrastructure The Kroondal Operations are situated near Rustenburg town in the North West Province of South Africa. The site is accessed via the multiple networks of well-maintained tarred roads. From Pretoria, the operations are accessed via N4 highway into Rustenburg town, then the R104 to the Operations. From Johannesburg, Rustenburg town is accessed via R24 road passing through Magaliesburg or the R512 (regional dual carriage tarred road) from Johannesburg, which intersects with the N4. Refer to Sections 4.4 and 15 and Figure 2 for details on Infrastructure. 4.3 Climate Rainfall occurs throughout the year, but predominantly between November and March, mainly as thunderstorms. Annual rainfall averages approximately 650 mm. The wettest month of the year is January, with an average monthly total rainfall of 132 mm. The driest month is July, with an average monthly total rainfall of approximately 2 mm. Mean annual air temperatures range from 11.8°C in June/July to 23.8°C in January. Average daily maxima range from 20.4°C to 30.3°C, and minima from 2.8°C to 17.2°C. Winds are mainly light to moderate and blow from the north-easterly sector, except for short periods during thunderstorms or weather changes when they have a southerly component. The lightning ground flash density in the area is a moderate risk to the concentrators with between 5 to 7 strikes/km2/year (on a scale of 0 to 19). No severe climatic effects influence the mining and ore processing operations at the Kroondal Operations proceed all year round. 4.4 Infrastructure and Bulk Service Supplies The Kroondal Operations have been operational for decades. The regional and onsite infrastructure for mining and ore processing is well established. There is a good supply chain for all required consumables and equipment in or near the mine site. The Kroondal Operations, through Sibanye-Stillwater, is well connected to the international supply markets for any materials and equipment not available locally. The Kroondal Operations are supplied with bulk electricity from the regional grid owned and operated by the state-owned company, Eskom. Details for Power supplies are supplied in Section 15.3 and for Water supplies in Section 17.5.6. 29 Rustenburg Municipality and the neighbouring Madibeng Municipality host a combined population of greater than 1.2m people and most services needed are found in the surrounding towns and cities. 4.5 Personnel Sources The Kroondal Operations have specific policies, procedures and practices in place, which address, on an integrated basis, its human resource requirements. Recruitment is informed in the main by the operational requirements of the Kroondal Operations for specific skills, by the extent of labour turnover levels and by relevant legislation. The organisational structure currently in place, together with operational management, will remain until such time as planned shaft closures occur, following which downsizing will be assessed. Organisational structures and staffing requirements (Table 12) are by and large determined by operational requirements and the production profile of the operation. The economic climate, cost infrastructure and Mineral Reserve profile also influence the organisation structures and required labour complement. Table 12: Number of Employees 2018 2019 2020 2021 No. of Employees 5,847 5,724 5,489 5,397 Manpower is sourced from different areas of South Africa and beyond, although preference is given to manpower from local communities within the Northwest Province in support of local economic development. Table 13 provides a breakdown of the origin of employees as per province, including beyond the border of South Africa. Many of the Kroondal Operations’ employees live in Rustenburg and neighbouring towns. Table 13: Origin of Employees Province Number of Permanent Employees Number of Contractors Percentage Eastern Cape 789 614 16.44% Free State 248 125 4.37% Gauteng 320 211 6.22% KwaZulu-Natal 68 99 1.96% Limpopo 374 380 8.83% Mpumalanga 198 120 3.73% North West 2,134 1,456 42.06% Northern Cape 55 35 1.05% Western Cape 5 3 0.09% Non-South Africans 1,206 96 15.25% Total 5,397 3,139 100.00% 30 5 History 5.1 Ownership History Operations were started in 1996 by Aquarius Platinum Limited until the acquisition by Sibanye-Stillwater in 2016. The historical development of the Kroondal Operations is summarised in Table 14.
31 Table 14: Historical Development Company / Ownership/ Operator Date Activity Aquarius Platinum Limited 1996 A pre-feasibility study on the Kroondal Platinum Project was completed. Aquarius Platinum Limited 1997 The bankable feasibility study of the Kroondal Platinum Project was completed and confirmed a Mineral Resource of 25Mt at a cut-off grade of 5.4g/t Aquarius Platinum Limited 1998 Mine development began and an initial off-take agreement was signed with Implats that continues until 2008 Aquarius Platinum Limited 1999 Mining via two decline shafts (originally the Central and East shafts, now Kopaneng and Simunye) began in March and by year-end, full production was achieved, and the initial plant commissioned Aquarius Platinum Limited 2000 Aquarius increased its stake in Kroondal to 94.57% and then to 100% Aquarius Platinum Limited 2001 Initial joint venture (50:50) agreement entered into with Rustenburg Platinum Mines, a subsidiary of Anglo American Platinum that was effective 1 July 2001 and included a second concentrator plant Aquarius Platinum Limited 2003 Aquarius enters into a 50:50 pool and share agreement with Anglo American Platinum aimed at doubling output. This agreement was effective November 2003 and included an off-take agreement with Anglo Platinum for the Mineral Resources covered by the agreement Aquarius Platinum Limited 2005 Second concentrator plant commissioned Aquarius Platinum Limited 2006 Construction of fourth shaft, Kwezi (K5), begins, Marikana 6 Shaft placed on Care and Maintenance Aquarius Platinum Limited 2008 Production ramp-up at Kwezi began and continued into the following year with a total of four decline shafts in production. Aquarius Platinum Limited 2011 Development of a fifth shaft, K6, was started. Aquarius Platinum Limited 2012 Marikana 4,5 shafts placed on care and maintenance Aquarius Platinum Limited 2013 The extent of the resource included in the PSA agreement was extended, thus further prolonging Kroondal’s life-of-mine Aquarius Platinum Limited 2015 Production ramp-up at K6 completed. Aquarius Platinum Limited/ Sibanye- Stillwater 2016 Sibanye acquired a 50% stake in Kroondal following the acquisition in full of Aquarius Platinum Limited on 12 April 2016. Sibanye- Stillwater 2017 The full operational period under Sibanye-Stillwater. Delivered highest 4Eoz output in history Sibanye- Stillwater 2020 The Covid-19 Pandemic and the associated national lockdown affected all production from April 2020 to the middle of May 2020, at which point a gradual build-up in production was initiated with a return of employees continuing right up into December 2020 in line with regulatory requirements. Sibanye- Stillwater 2021 Optimisation of mine boundaries between Bathopele (SRPM), K6 and Kopaneng (Kroondal) and deepening of the Kroondal East complex (Kopaneng and Bambanani) into Siphumelele ground resulted in an extended LoM for Kroondal as part of the new agreement between AAP and SSW. 5.2 Previous Exploration and Mine Development 32 5.2.1 Previous Exploration The Kroondal Operations have been intensively explored by surface and underground exploration drilling, geophysical surveys (airborne magnetics), trenching and geological mapping carried out over a period of more than 55 years by previous owners including AAP and Aquarius. This intensive exploration has proven the extension at depth of the UG2 Reefs to the north-northeast. Initial geological understanding of the area was developed from observations made from the surface and underground mapping, combined with exploration drill hole information and extrapolations of features observed in other platinum mines in the south-western Bushveld Complex. Current interpretations of the geological and structural framework applicable to the Merensky Reef and the UG2 Reef have evolved as new and more detailed geological information and datasets were obtained. There has been a significant decline in surface exploration drilling over the past five years, with a limited amount of surface exploration conducted at the Bambanani Shaft by Sibanye-Stillwater during 2019. However, exploratory visits are conducted in previously mined areas to confirm structure and facies. 5.2.1.1 Aeromagnetic Surveys The entire Kroondal Operations area has been covered by a high-resolution helicopter-borne aeromagnetic (‘AM’) and radiometric survey, carried out in late 2002 and early 2003 by Fugro Airborne Surveys, on behalf of Anglo-American Platinum, at a line spacing of 50m and a sensor clearance of 20m with results shown in Figure 5. Various image processing techniques were used to enhance and aid interpretation of this data and this allowed interpretation of major northwest-southeast structural trends and east-west striking faults. In addition, two dominant trends of magnetically susceptible dykes have been recognised; the northwest-southeast striking positively and negatively magnetised dolerite dykes as well as the east-west trending dolerite dykes. The AM data has also assisted with the identification of dunite pipes as well as potential Iron-rich replacement pegmatites (IRUP) areas. The QPs’ experience at the Kroondal Operations has however shown that the dimensions of actual IRUPs at the Merensky Reef and UG2 Reef elevations are commonly smaller than the dimensions of the associated magnetic anomaly. Consequently, the actual IRUPs have a smaller impact on geological losses than suggested by the AM data. Also apparent is the magmatic layering of Bushveld stratigraphy as an indication of the strike of the orebody. 33 Figure 5: Aeromagnetic Survey for Kroondal Operations 5.2.1.2 3D Seismics There are no known seismic surveys over the area. Seismics are only done over the areas with Merensky Reef. 34 5.2.2 Previous Development Refer to Table 15 for details of the historical production and financial parameters in calendar years (C) from 2017 to 2021. Table 15: Historical Production and Financial Parameters Unit Financial Years C2017* C2018* C2019 C2020 C2021 Main development (1) Advanced (km) 15 12 12 8 8.5 Area mined (1) (’000m2) 840 957 983 733 884 Tonnes milled (2) Underground (’000) 7 556 7 730 8 120 5 994 7 050 Surface (’000) Total (’000) 7 556 7 730 8 120 5 994 7 050 BUHG (3) Underground (g/t) 2.42 2.48 2.46 2.46 2.40 Surface (g/t) Combined (g/t) 2.42 2.48 2.46 2.46 2.4 4E produced @ 100% Underground (Moz) 0.482 0.510 0.530 0.394 0.453 Surface (Moz) Total (Moz) 0.482 0.510 0.530 0.394 0.453 Operating Costs(4) Underground (ZAR/t) 634 676 709 883 896 Surface (ZAR/t) Total (ZAR/t) 634 676 709 883 896 Operating Costs (USD/oz) 747 773 751 817 943 (ZAR/oz) 9 932 10 238 10 862 13 440 13 941 All in cost(6) (USD/oz) 765 744 745 821 875 (ZAR/oz) 10 176 9 849 10 768 13 512 12 943 Capital Expenditure (ZARm) 381 283 426 376 536 *Management of Kroondal Operations was taken over in mid-2016. Prior to C2018, the reporting KPI’s were different and this information is not available. 1. Main development and area mined comes from Kwezi Shaft and K6 Shaft (Kroondal West); Simunye Shaft and Bambanani Shaft, Kopaneng Shaft (Kroondal East) 2. Tonnes Milled are from all operating shafts and open-pit operations operational at the time of reporting 3. Built-up head grade (BUHG) is in 4E 4. Cost data indicated from 2018 to the year 2021 5. Production data is for the period Jan to Dec 6. Ounces and kilograms are based on 4E 6 Geological Setting, Mineralization and Deposit 6.1 Regional Geology The Bushveld Complex (Figure 6) is approximately 2,060 million years old. Its mafic to ultramafic rock sequence, the Rustenburg Layered Suite (RLS), is the world’s largest known mafic igneous layered intrusion containing about 80% of the world’s known Mineral Reserves of PGMs (Crowson,2001 quoted in Cawthorn, 2010). In addition to PGMs, extensive deposits of iron, tin, chromium, titanium, vanadium,
35 copper, nickel, and cobalt also occur. The Bushveld Complex extends approximately 450 km east to west and approximately 250km north to south. It underlies an area of some 67,000km2, spanning parts of Limpopo, North West, Gauteng, and Mpumalanga Provinces in South Africa. The RLS which was derived from differential crystallisation of multiple magma injections occurs geographically as five discrete compartments termed ‘limbs’, three of which are being exploited for PGMs. These are the Western, Eastern, and Northern Limbs. The Kroondal Operations are on Western Limb (Figure 7). The RLS comprises rocks ranging from dunite and pyroxenite through norite, gabbro and anorthosite to magnetite- and apatite-rich diorite, subdivided in terms of a mineralogically based zonal stratigraphy into five principal zones. Figure 6: Geology of the Bushveld Complex, South Africa 36 Figure 7: Geology of the Western Limb of the Bushveld Complex, South Africa From the bottom to the top (Figure 8), these are the 1) Marginal Zone, 2) ultramafic-rich Lower Zone, 3) mafic-rich Critical Zone which hosts multiple chromitite and PGM layers, 4) a mafic-rich Main Zone consisting mostly of gabbro-norites and norites, 5) and the final Upper Zone derived from the crystallisation of iron-rich residual fluids. The RLS varies in vertical thickness, reaching up to 8km in places with some individual layers traceable for over 150km. However, the PGM-bearing reefs are typically only 0.3m to 15m thick, although much greater thicknesses are recorded in the Platreef of the Northern Limb. In the Eastern and Western Limbs, the Critical Zone contains the two principal PGM-bearing reefs: the Merensky Reef and the UG2 Reef. The Merensky Reef at the Kroondal Operations is mined out and the UG2 Reef accounts for all Mineral Resources and Mineral Reserves reported for the operations. 37 Figure 8: Regional Stratigraphic Column of the Rustenburg Layered Suite 6.2 Deposit Type 6.2.1 Formation of Deposit PGM reef-type deposits are deposits where the PGM are the main products and Ni and Cu are the by- products (e.g., the UG-2 and Merensky reefs of the Bushveld Complex, or the J-M reef of the Stillwater Complex, Montana and the MSZ of the Great Dyke of Zimbabwe). The deposits generally contain less than 1-2% sulphide minerals and tend to form laterally relatively persistent stratiform horizons in large layered intrusions that are often relatively easy to trace once they have been intersected. Most mineral deposits can be classified into specific groups or types and exhibit common features and mineralogical associations which relate to the geological processes that ultimately formed them. Ni-Cu- PGM deposits can be found in a variety of deposit types including: (a) magmatic, (b) hydrothermal, (c) sedimentary/placer, and (d) residual/laterites; however, they are almost exclusively dominated by magmatic processes. Magmatic Ni-Cu-PGM deposits have been some of the most sought after and important deposits in the world. At a basic level, the formation of these deposits relies on magma generated from the Earth’s mantle, which then intrudes its way into the crust, often melting and 0 1000 2000 3000 4000 5000 6000 7000 8000 Marginal Zone Lower Zone Lower Critical Zone Upper Critical Zone Main Zone Upper Zone (Norite) (Pyroxenite; Harzburgite; Dunite) (Pyroxenite; Harzburgite; Dunite) (Anorthosite; Norite; Pyroxenite) (Gabbro; Anorthosite; Norite; Pyroxenite) (Gabbro; Olivine diorite; Anorthosite) Upper Group UG2 UG1 Merensky Reef Norite and Anorthosite Chromitite Pyroxenite General stratigrap ic column of the Rust nburg Layered Suite Pegmatoidal feldspathic pyroxenite (m) 38 incorporating the surrounding rocks causing ‘contamination’ within the original magma. Slow cooling of these magmas generates immiscibility between sulphur and silicate liquids, ultimately leading to the formation of Ni-Cu-PGM enriched sulphide rocks embedded within mafic and ultramafic igneous rocks. Many of these deposits around the world have been identified and are well documented in the literature, including the largest one, Stillwater Complex (United States of America), Norilsk (Russia), Sudbury Complex (Canada) and Great Dyke (Zimbabwe) as well as the Bushveld Complex (South Africa). Ni-Cu-PGM deposits are associated with mafic-ultramafic magmatism with a few key differences to mention between these deposits. 6.2.2 Stillwater Complex The Stillwater Complex is the world’s fourth largest PGM deposit known today and comprises a large irregular sheet-like ultramafic intrusion. The intrusion can be divided into Ultramafic Basal Series, Lower Banded, Middle Banded and Upper Banded series, which show evidence for multiple injections of magma. The most economically important series is the Lower Banded series, which contains a broadly continuous zone of PGM-rich olivine units known as the J-M Reef (McCallum, 1996). The J-M Reef is hosted within a sequence of harzburgitic and troctolitic rocks and can be traced along strike for approximately 36km with an average thickness of 2m (McCallum, 1996). The reef contains 1-2% disseminated sulphides at 20- 25ppm Pt + Pd with 3.6 times the Palladium to Platinum content. Due to the steeply dipping nature of this reef, underground mining methods have had to be implemented. 6.2.3 Norilsk Province Norilsk is the third-largest Ni-Cu-PGM deposit in the world. The Norilsk Province represents a large extrusive or volcanic sequence of basaltic lavas with rare komatiite lavas intruded by isolated layered ultramafic magmas. Like the Stillwater Complex, the Ni-Cu-PGM deposits within the Norilsk Province are associated with these layered ultramafic intrusions. Unlike Stillwater, the sulphides within this province are found ranging from massive, veinlet-disseminated to disseminated ore bodies at varying intervals throughout the layered intrusives. The mineralised zones within the layered intrusives are complex and variable in size and shape, therefore emphasis has only been placed upon the massive ore bodies. The massive ore bodies are by far the most economical in value, which are recorded to reach hundreds of metres in lateral extent ranging from centimetres to 45m in thickness (Krivolutskaya et al., 2014). Ni content is extremely high with these massive ores, up to 3.21 wt %, with Ni/Cu ratios ranging from 0.23 to 0.45. PGM contents within these zones reach 1.5 – 2.0 ppm Pt and 7.0 – 9.0 ppm Pd, mostly confined to the margins of the massive ore bodies (Krivolutskaya et al., 2014). 6.2.4 Sudbury Complex The Sudbury Basin is a unique type of Ni-Cu-PGM deposit, as it is the only deposit that is related to a meteorite impact as well as the world’s largest Ni deposits. The complex has been suggested to have formed by impact melting of originally mafic rock types, which have generated a magmatic body consisting of a lower melanocratic norite overlain by leucocratic norite. Then lower norite unit is recorded to have elevated Ni (40 – 1000 ppm), Cu (40 – 1140 ppm), and Pt + Pd (3.7 – 15.1 ppb) with the upper more felsic norite being only somewhat enriched in these elements (Keays & Lightfoot, 2004). Due to the complicated relationship of this deposit with the meteorite impact, several types of
39 mineralised zones have been described, which includes a contact layer, footwall breccias, large radial structured dykes and vein-like deposits (up to 1,000m from the centre of the impact structure). The impact structure itself has been measured up to 200km in diameter, displaying an oblate-like shape. The deposits found within the Sudbury Complex are mainly confined to the margins of the magmatic body and are relatively scattered throughout. The average grade of the deposits been mined show roughly 1.2 wt% Ni, 1.1 wt% Cu, and 0.8 g/t Pt + Pd, and therefore, have been targeted mainly for their Ni and Cu contents with PGM mainly as a by-product (Keays & Lightfoot, 2004). 6.2.5 The Great Dyke The Great Dyke is a linear intrusion that trends north-south that cuts across the Archaean granites and greenstone belts of the Zimbabwe craton consisting of layered mafic and ultramafic rocks (Chaumba and Musa, 2020; Wilson and Prendergast, 2001). The length of the Great Dyke is 550 km, and its thickness varies between 4 km and 11 km in width. The Great Dyke acts as host to the second-largest resource of PGMs in the world (Wilson and Prendergast, 2001). Four sub-chambers make up the Great Dyke, namely Musengezi, Darwendale, Sebakwe and Wedza sub-chambers (Wilson and Prendergast, 2001). Two economically viable zones have been identified: the Main Sulphide Zone (MSZ) which is the most economically viable and the thicker, but lower grade, and the Lower Sulphide Zone (LSZ) that contains much less sulphides. The Main Sulphide zone is 1 to 15m thick, and the Lower Sulphide Zone is 30 to 80m thick. Both the MSZ and LSZ occur within pyroxenite of the uppermost ultramafic cyclic unit (Wilson, 1996; Wilson and Prendergast, 2001). The average grades reported from mining operations at Ngezi, Unki and Mimosa have shown roughly 3.86 g/t 6E. 6.2.6 The Bushveld Complex The Bushveld Complex comprises several intrusive and extrusive bodies, including the RLS, the Lebowa Granite Suite, the Rashoop Granophyre Suite, and the Rooiberg Group Volcanics. The RLS comprises many layers grouped into stratigraphic units from base to roof: Marginal Zone, Lower Zone, Critical Zone, Main Zone and Upper Zone, which are distinguished on geological maps or cross-sections. These stratigraphic units show evidence for repeated injections of magma and the changes in mineral composition with stratigraphic position show trends and patterns consistent with the expected crystallisation pattern of mafic magma. The Bushveld Complex is a remarkably well preserved, extremely large mid-Proterozoic intrusion that has escaped regional metamorphism and extensive deformation. The most economically important stratigraphic unit within the RLS is the Critical Zone, which hosts the world greatest chromite and platinum deposits. These deposits are usually situated in successive well- defined layers and are locally termed ‘reefs’. The PGM deposits occur within the well-defined Merensky and UG2 Reefs. The Merensky and UG2 Reefs are Cu-Ni-PGM-enriched contact-type and stratiform chromitite deposits respectively, with low sulphur content. The PGM mineralised layers are typically in stratigraphic intervals that mark a major lithologic and petrologic change in the layered igneous intrusion. 40 6.3 Local and Property Geology 6.3.1 Stratigraphy The recognised stratigraphy underlying the Kroondal Operations comprises the Main and Critical Zones of the RLS. The stratigraphy of the RLS as formalised by the South African Committee for Stratigraphy (SACS, 1980) is used in this report. The Main Zone predominantly comprises gabbro–norite and norite rock types, whereas, in the Upper Critical Zone, pyroxenite, norite, anorthosite, and chromitite lithologies are found. The Upper Critical Zone stratigraphy of the RLS, which contains the units of economic interest, the Merensky and UG2 Reefs, comprises well-developed cyclic units divided into six sub-units as follows (Figure 9): • Bastard Pyroxenite • Merensky Reef • Merensky Footwall • UG2 Hangingwall • UG2 Chromitite Layer/Reef • UG1 Chromitite Layer Figure 11 shows the dip cross-section through the reefs. In Kroondal Operations, there are local variations in thicknesses of individual stratigraphic units. The Giant Poikilitic Anorthosite (GPA) generally defines the start of the Critical Zone, which normally occurs 5m to 10m above Bastard Pyroxenite and approximately 20m to 25m above Merensky Reef. The GPA is normally about 7m to 10m in thickness. The Merensky Reef at the Kroondal Operations is mined out and will not be discussed further. 41 Figure 9: General Stratigraphic Column of the Local Geological Succession After Smith et al (2004) 42 6.3.2 Ore bodies 6.3.2.1 UG2 Reef The UG2 Reef consists of the Main Seam chromitite. Overlying the UG2 Main Seam is an unmineralized pyroxenite layer, locally termed the pyroxenite parting or simply parting (UG2P). Above the pyroxenite parting (UG2P) another chromite layer, the UG2L, locally referred to as the Leader Seam, is the topmost mining mineralised lithological unit. It is these three units which form the mineable reef portion at Kroondal Operations. The thickness of the Main Seam ranges from 65cm to 80cm, whilst the pyroxenite parting varies from 10cm to 4m, and the Leader Seam thickness varies from 12cm to 25cm. In areas where the pyroxenite parting is too wide, (greater than 250cm), then only the Main Seam is exploited. The UG2 and UGL display a mottled appearance due to the presence of large bronzite crystals within the chromite. UG2 Main Seam The UG2 Main Seam is chromitite rich, but lower in gold, copper, and nickel values compared to Merensky Reef. It is consistently developed in the RLS, occurring vertically between 90m to 150m below the Merensky Reef in the Kroondal Operations. The UG2 Reef dips in a northerly direction. The hangingwall to the UG2 Reef is a 6m to 7m thick feldspathic pyroxenite interlayered by a succession of multiple chromitite layers that are referred to as Leader Seam and triplets layers. The Leader Seam The Leader Seam is a chromitite band that is approximately 15cm thick. The stratigraphic separation between the Main Seam and the Leader Seam is a feldspathic pyroxenite with a vertical thickness ranging between 20cm to 250cm. The Triplet Chromitite Layers These chromitite layers are interlayered with the feldspathic pyroxenite. This succession is between 30cm to 70cm thick. The triplets are found between 2m to 10m above the UG2 Main Seam. The variation in the separation between chromitite layers and the UG2 Main Seam affects the mining of the UG2 Reef. The UG2 Main Seam, Leader Seam and triplets layers are variably separated in thicknesses which result in thinning and thickening of the stratigraphic package. The geotechnical consideration is where the separation distance between the Leader Seam and the Main Seam is less than 30cm. The geotechnical beam for a stable hangingwall to the mining excavation is required to be greater than 30cm thick. Underlying the UG2 Main Seam is the pegmatoidal feldspathic pyroxenite which varies in thickness from a few centimetres up to 2m. The normal footwall stratigraphy comprises pegmatoidal pyroxenite, which is in turn underlain by a succession of norite, pyroxenite, and anorthosite. The UG2 Main Seam is occasionally unconformably underlain by norite footwall. For the UG2 Reef package, the number and position of the chromitite layers associated with the pyroxenite hangingwall stratigraphy determine the geozone definition. In-situ mineralisation of the UG2 Reefs is captured by the definition of geozones (see Section 11.1.2 and Figure 24).
43 6.3.3 Structure The UG2 and Merensky Reefs form an east-west trending open arc, with a strike varying between 90° in the east to 145° in the west. The general dip of the reef is 9° to 10°. The middling between UG2 and Merensky Reefs varies between 120m to 140 m. The dip of the encompassing regional stratigraphy also varies between 9° and 10° with a general east-west strike direction. Other dip decreases locally between 1° to 5° and increases to between 15° to 30° along a monocline trending east-west at depth. The dip decreases from 3° to 7° across the farms of Klipgat and Turffontein, also roughly striking east- west. Localised geological discontinuities associated with the Merensky and UG2 Reefs include potholes, faults, joints, shears zones, dykes and IRUP bodies. The structure map is shown in Figure 10. Figure 11 shows a typical cross-section of the reefs in the Kroondal area. 44 Figure 10: Structural Interpretation 45 Figure 11: Typical Cross-Section 6.3.3.1 Faults The Qualified Person has defined faults that transect the mining operation. Low angle faults exist with very small displacements but are very important to understand to ensure correct hanging wall support recommendations. At depth, the farms of Klipgat and Turffontein have various strike-orientated faults trending in a west-northwest to east-southeast direction with varying throws. The F-series faults are boundary faults: The Turfontein shear cuts across the eastern Kroondal Operations and is a fault zone with multiple faults of various throws with both strike and dip displacements. 6.3.3.2 Dykes Post mineralisation dykes of various scales are prominent across the property. These structures typically define strike mining limits as well as influence reef continuity. Dyke occurrences are between 1cm and 30 meters wide. They have steep dips varying between 70° and 90°. Dykes may be water-bearing. 6.3.3.3 Potholes and slumps Potholes associated with the UG2 Reefs are generally observed as semi-circular features at the Kroondal Operations. They vary in size from a few meters to hundreds of metres in diameter. The depth of the potholes is highly variable. There is no definitive relationship between the depth and the size of potholes. To a certain degree, the following relationship between the dip and size of potholes has been observed by the QP: the steeper the dip of the pothole, the smaller the size. Potholes and certain steep dipping roll structures in the reef result in geological losses. The schematic section in Figure 12 describes the type of potholing of the UG2 Reef. 46 Figure 12: Schematic Diagram Showing the Model of the Pothole from the UG2 6.3.3.4 Iron-rich replacement pegmatites (IRUP) The IRUP comprises a suite of coarse crystalline and unconformable bodies, which occur throughout the Bushveld Complex (Figure 13). They range from small, irregular, and vein-like features to large sheet-like bodies up to hundreds of meters across and pipe-like plugs up to 1.5km wide. Close to the IRUPs, the UG2 Reef is mostly partially replaced and thus recognizable, or even not replaced at all where the IRUPs are situated either in the hangingwall or footwall stratigraphy. However, the mineralogy of the reefs is changed due to the high temperature, high pressure, and volatiles associated with the replacement process that reduces plant recoveries of the PGM assemblage.
47 Figure 13: IRUP(red) unconformably cut across the layered lithological sequence. 6.3.4 Mineralogy UG2 Reef The UG2 consists predominantly of chromite (60 to 90% by volume) with lesser silicate minerals 5 to 30% pyroxene and 1 to 10% plagioclase. Other minerals, present in minor concentrations, can include the silicates: phlogopite and biotite, the oxides: ilmenite, rutile and magnetite, and base metal sulphides. Secondary minerals include quartz, serpentine and talc. The Cr2O3 content of the UG2 Reef varies from 30 to 35%. The PGMs present in the UG2 Reef are highly variable, but generally, the UG2 is characterised by the presence of various PGM sulphides, comprising predominantly laurite (RuOsIr sulphide), cuperite (PtS), braggite (Pt, Pd, NiS), and an unnamed PtRhCuS. The PGMs only reach an average size of approximately 12µm, with particles larger than 30µm being extremely rare. Most of the PGMs occur in association with the base metal sulphides and silicates. It is only the mineral laurite that exhibits a preferred association with the chromite grains. Both the grain size and associations are extremely important as these affect the metallurgical behaviour during subsequent processing. The major base metal sulphides constitute chalcopyrite, pentlandite and pyrrhotite. The base metal sulphides occur almost entirely within the interstitial silicate and are only very rarely enclosed within the chromite particles. The grain size of the base metal sulphides rarely exceeds 30μm. The distribution of grades within the layer is not uniform. However, PGMs are generally concentrated at the upper and lower contacts of the main chromitite seam, with lesser concentrations in the Leader seams. The highest PGM concentration is generally recorded at the base of the UG2 Reef chromitite. In the UG2 Reef, Cu, Ni and Sulphur values are extremely low. 48 7 Exploration There is no current exploration on this property. Any drilling, including surface drilling is related to mine planning. There are no exploration results to report. Information below on surface holes is given to illustrate the type of data that was collected in the past. 7.1 Exploration Data Kroondal Operations are established mining operations in a mature mining district. There are no greenfields exploration programs associated with this operation. However, underground (brownfield) evaluation drilling and adhoc surface definition drilling continue. The property is an established mine and the extent of the mineralization is well defined. Non drilling exploration is not relevant to the property at this stage of development. 7.2 Geophysical Surveys No geophysical surveys have been flown over the property recently. A brief description of historical aeromagnetic surveys is given in Section 5.2.1. 7.3 Topographic Surveys The topography in the lease areas is well mapped from historical surveys and any recent changes to the surface topography will not affect the geological interpretation or infrastructure. There have been no new surveys related to exploration recently. 7.4 Exploration and Mineral Resource Evaluation Drilling 7.4.1 Overview Geological models are based on all available information comprising diamond drilling and underground channel sample data, underground mapping as well as remote geophysical and remote sensing data (including Aeromagnetic and Wireline surveys). This information is available for the entire Kroondal Operations area. Surface diamond drill holes (DDH) were generally drilled on irregular grid intervals of 150m-1,000m, depending on historical exploration strategy, depth of the mineralised horizons and geological uncertainty. Underground Drilling At all Kroondal Operations, mining takes place on the plane of the reef, so the only underground drilling that takes place is to delineate geological structures, especially potholes, for geological modelling purposes but not for Mineral Resource estimation. Historically, several drill holes targeting the UG2 Reef were collared at the Merensky Reef elevation from underground excavations resulting from the mining of the Merensky Reef. 49 Surface Drilling The Kroondal Operations were drilled extensively by the previous owners resulting in most areas classified as Measured Mineral Resources. Therefore, surface drilling is undertaken on an ad-hoc basis when there is a need to firm up geological grade models and investigation of the UG2 Reef behaviour where underground drilling is not suitable because of the general orientation of reef relative to mine infrastructure. The core is halved using a diamond saw, with one half retained for records and the other half assayed. Sample sections are captured directly into the SABLE database, where the spatial validity is checked. Planned and unplanned task observations are some of the quality control procedures used to ensure sampling protocol is maintained. The final submission of each sample into the Sibanye-Stillwater SABLE database is only completed following a series of checks and approvals. Kroondal Operations rely on Quality Laboratory Services, a South African National Accreditation System (SANAS) accredited laboratory for geochemical analysis of the samples. Kroondal Operations Drillhole Inventory A total of 1,394 drillhole intersections are included in the drillhole dataset. These can be divided as follows: • 899 drillholes (including deflections) are derived from surface drilling campaigns up to 2020. • 495 drillholes are derived from underground drilling collared at the Merensky Reef elevation and the UG2 Reef intersections were sampled and assayed. • 276 drillholes were removed due to geological disturbances i.e. potholes, faults, IRUP etc. • 79 drillholes were removed due to specific validation errors detailed in the data processing macros. • 118 drillholes were removed due to other reasons e.g., cover holes or flat dipping holes < less 60 degrees that could not be accurately corrected for length compositing. • 32 drillholes were excluded from Mineral Resource estimation due to historical problems. • 889 drillholes (including deflections) in the SABLE database are authorised and validated for Mineral Resource estimation: Changes in the drillhole inventory in 2021 are shown in Figure 14 and Figure 15. A single surface hole may have several deflections. Each deflection/intersection is counted as a “drillhole” for the purposes of reconciliation. 50 Figure 14: Reconciliation of Drillhole Data Figure 15 Reconciliation of Historic Drillhole Data 7.4.2 Planned Evaluation Drilling for 2022 Table 16 represents the drilling that was carried out at Kroondal Operations in 2021, planned drilling for 2022 compared to the actual drilling results of 2021, 2020 and 2019.
51 Table 16: Kroondal Operations Evaluation Drilling Costs Exploration (WC & Capital All Reefs) C2022 Plan C2021 Actual C2020 Actual C2019 Actual Meters Planned ZAR Million Meters Drilled ZAR Million Meters Drilled ZAR Million Meters Drilled ZAR Million Kwezi UG 2,100 1.82 1,118 0.92 1,797 1.31 1,201 0.92 Kwezi Surface 2,488 4.45 - - - - - - K6 UG 1,000 0.72 336 0.24 913 0.64 415 0.28 K6 Surface 1,020 1.55 - - Kopaneng UG 1,397 1.02 1,555 0.91 1,178 0.97 319 0.21 Kopaneng Surface 632 0.90 - - - - - - Simunye UG 640 0.48 1,370 1.03 1,134 0.92 1,163 0.77 Bambanani UG 2,880 2.16 1,726 1.49 961 0.7 655 0.42 Bambanani Surface 6,837 9.92 1,181 1.27 0 0 2,756 4.13 MK5 and Klipfontein Surface 2,875 4.20 21 0.02 - - 756.00 1.04 Total 21,869 27.23 7,308 5.89 5,983 4.54 7,265 7.77 An overview of the drilling is provided in Figure 16. The target areas and activities identified are four specific areas or shafts being Kwezi, Bambanani, Kopaneng and Marikana 5(MK5). For the Kwezi Shaft area, drilling is planned to investigate the IRUP extent and improve the block models. The IRUP is accounted for as 100% geological loss as it replaces the reef or negatively impacts metallurgical recoveries. These drillholes will also assist in interpreting geological structures, especially faults that are prominent at this shaft. At Kopaneng Shaft, drilling is planned as infill drilling due to the sparsity of drilling data. At Bambanani, drilling is planned to improve the block models as there are areas where the drilling spacing is too wide. Drilling will also assist in structural investigations of the area. MK5 is a project area that is under review. Mining in this area was done some years back and the plan is to revisit this area. The area is structurally complex. The area has higher grade blocks generally from the narrower pyroxenite internal waste than other areas. 52 Figure 16: Overview of Drilled Boreholes Kroondal and Rustenburg 7.4.3 Drilling Methods 7.4.3.1 Surface Diamond drill coring is the preferred method of drilling at the Kroondal Operations. Figure 17 shows a typical diamond drill core with the machine diamond drilling bit. 53 Figure 17: Example of Diamond Drill Core (https://www.geologyforinvestors.com/diamond-drillhole-drilling/ accessed 23/09/20) The typical steps followed would have been: • In a case where Sibanye-Stillwater does not own the surface rights, permission from the land owner is obtained. • A drillhole start note is compiled, which displays the drillhole identification, location of the collar, the planned depth and a plan showing any possible underground workings that could be intersected. The drillhole is to be sited by the responsible geologist using a GPS. • The drill rig supervisor will establish the drill site using a minimum footprint and will comply with good housekeeping and approved standards and procedures. • The drill site will be clearly demarcated by use of the appropriate materials and open sumps should be contained within a secured or permanently manned area. • Drilling begins with a large diameter ‘open hole’ (open hole means non-coring and only chips are recovered). The diameter of this hole can be 200 to 250mm (8 to 10 inches). The depth of this hole also varies as it is usually drilled to solid bedrock, through soils and oxidized rock. The diameter of the hole reduces in various steps, at differing depths down the hole, to reach typically BQ size hole (75mm hole size and 50mm core). • Hole collar is surveyed using land surveying methods to give x, y, and z positions or coordinates. • Drilling continues until one or both reefs are intersected, or in the case of an unsuccessful hole the hole is abandoned. Once the reef is intersected, an additional 50m is drilled and the ‘Mother hole’ as it is then known as complete. • Once the mother hole is complete, a down hole survey is performed (and any other geophysical surveys as required), so that the inclination and direction of the hole can be recorded. (Section 7.6). 54 • Typically (but not always), additional intersections (or runs) of the target reef are obtained by ‘wedging’. A steel wedge is inserted above the reef and locked into place, this can be directional i.e., surveyed in place or non-directional meaning the direction of the resulting deflection is not prescribed. The wedge acts as a guide to deflect the drill string off to one side of the hole so that additional reef intersection can be obtained. • This is repeated as often as needed to get representative reef intersections, with the wedges being set higher and higher up the hole, and denoted by the identification of the drillhole ID _D1 to drillhole ID _Dn. Under normal reef conditions, four (4) deflections are planned per reef intersection. • All reef runs are drilled TBW core size. • A diagram of a set of deflections from its motherhole is known as a dendrogram and is shown in Figure 18 • Once the drillhole is completed, rods are removed, the upper part of the hole is cemented or plugged and any recoverable casings are removed. • Whole site is rehabilitated and a cap or marker is placed on the remaining casing to the requirements of the landowner. Figure 18: Schematic Vertical Section of a Typical Surface Drillhole 7.4.3.2 Underground Drilling At Kroondal Operations prospect and cover drilling take place underground. The prospect drilling is designed to investigate geological structures like potholes, faults and dykes which are common within these operations. This helps delineate the reef's behaviour.
55 Cover drilling refers to the drilling of generally flat or slightly inclined holes ahead of mining to detect the presence of water and flammable gasses, which could potentially result in injury, fatalities and property damage. A digital plan depicting all the development ends per shaft is constructed annually and submitted to the Department of Mineral Resources and Energy (DMRE). The shafts are divided into different hydrological or risk areas based on the geology and historic water intersections. The type of water/flammable gas cover required for each area is clearly shown by this plan. The following types of cover are specified on the Water Plan: • Single Cover – A single set of staggered 120m cover holes with no less than a 15m overlap (Figure 19). • Double Cover – A double set of 120m staggered cover holes with a 60m overlap (Figure 20) o Note: Start of cross cuts, tramming loops, lay-bys and any excavation that is within 30m of haulage excavation are deemed to be in cover. The following risk areas are specified per shaft per area on the Water Plan: Level 1 Risk Area • All known major geological disturbances (inclusive of all dykes of more than 10m thickness, faults of more than 10m displacement and major shear zones) as indicated on the structural plan (Aeromagnetic study, surface mapping, original surface drilling and from historic underground mapping) will be cover drilled within a 150m envelope on either side of these known structures. These areas will include all historically recorded geological features associated with very poor ground conditions or water intersections greater than 5000 litres per hour or flammable gas intersections. The cover drilling design will be based on a single cover hole pattern with a 15m overlap portion in consecutive holes. Double cover may be recommended by a geologist for areas advancing through fissure zones known to have poor ground conditions. Level 2 Risk Area • These areas will be delineated around projected problematic geological structures that were intersected previously along dip or strike. These structures will be cover drilled on discretion through a documented decision taken during water board planning meetings. 56 Level 3 Risk Area • These areas pertain to localities on the mine property where no high volumes of water and/or flammable gas are expected from surrounding geotechnical observations. The development ends will be covered by the drilling of pilot holes as per mining standard for development ends. Every development end shall, before drilling blast holes, drill two pilot holes in opposing corners to prevent the uncontrolled intersection of water or flammable gas. Corners should be alternated between blasts. Pilot holes are under no condition a replacement for cover holes. The requirement for geological cover drilling over and above the pilot holes in an area will be revised during water board planning meetings and the area will be elevated to a Level 2 or Level 1 Risk Area and cover drilled accordingly. Mining within 60m depth below major rivers (mechanised mines) • An area that will be undermining a river will be cover drilled within a 150m envelope on either side of the river. The cover drilling design will be based on a double cover hole pattern with a 60m overlap portion in consecutive holes. Inclined Shafts (Decline) • All inclined shafts will at least be covered with a single series of overlapping cover holes drilled parallel to the dip of the excavation being developed. Inclined shafts are to be cover drilled with 120m inclined holes with 15m overlap. Figure 19: Configurations for Cover Drilling - Single Cover Drilling Layout (plan view one-sided). 57 Figure 20: Configurations for Cover Drilling - Double Cover Drilling Layout (Plan view). 7.4.4 Core Logging and Reef Delineation For both drillhole and underground diamond saw-cut channel samples, Kroondal Operations have a comprehensive standard defining the specific methodology for sampling, which is designed to ensure as far as possible unbiased and representative samples as well as to ensure the consistency of the sampling. 7.4.4.1 Surface The following is a brief description of the procedures in place for diamond core processing of surface drilling. All drillhole core, whether from surface or underground, is logged the same way, whereas sampling is only done for surface drilling core. The core is obtained from the core barrel, once the driller has completed a drill run, or preferably daily and emptied into a suitably sized (Core sizes AX, BQ, HQ, etc.) core tray. This tray is transported to the coreyard of the operation where the core is cleaned and marked with the depths of the run, the drillhole name and meter marks. Any losses are identified, and core loss amount noted. This mark-up is completed by the drill contractor. The core is then transferred into a differing ‘permanent’ core tray so that the transporting tray can return to the drill site. The geologist then observes the core and immediately checks for stratigraphic correctness. The following is an extract from Sibanye-Stillwater’s geological logging and sampling procedure which details the process: • Check that the core is clean, fits together and is orientated correctly per core box • Core boxes are laid out from shallowest to deepest, with ends of core in each box clearly marked • Determine core loss (or gain) and note position 58 • Any changes in lithology without faulting are noted and the core checked to see if it fits together on either side • Any discrepancies identified above are discussed and resolved with the Diamond Drill Foreman • Before logging in detail determines the major stratigraphic units and forms general impression of the hole • Mark reef and major lithological contacts with a permanent marker • Logging recorded in on logging sheet with all the required fields captured • Description of the reef as per standard • Layering and fault dips are measured parallel to the core axis and recorded and • Safety precautions. 7.4.4.2 Underground Channel Sampling Within underground workings, exposures of the reef have channel samples taken. Individual channels are cut using a diamond saw cutter, generally on the pillars left from the bord and pillar mining method or on the face of the mining panels. A detailed sampling record is kept showing the reef geometry at each section. Sampling intervals are generally at 40m spacings. Channels are defined perpendicular to the reef plane and each section’s position is fixed by offsetting from survey pegs. The reef is segregated into lithological units and is correlated between sample sections, and individual samples of 15cm – 25cm in length are taken to reflect the internal geometry of the reef, with not less than a 10cm sample being taken on contact. The sample mass taken is in the order of 300g to 500g. Adjacent samples spanning the hanging wall or footwall contact may be taken to increase the sample volume in the contact area. Capture - Underground Sampling All underground channel samples are captured in the MRM database. This database is linked to Sable Database for sample submission to the laboratory and QAQC. Capture – Drillhole Data • Logging and sampling are captured and uploaded into the SABLE Database • All quality control analysis on logging and assays is carried out via standard routines in SABLE and • Once authorised, drillhole data is safely stored in the SABLE database. 7.4.4.3 Quality Control in Drilling. Quality control in drilling has been practiced over many decades and was a standard feature of drilling procedures both historic and current. Table 17 shows the typical quality control measures adopted for drilling.
59 Table 17: Quality Control Drilling Risk/Mistake Cause Mitigation/Remedial Action Mixed core Dropped core tray Ensure pieces lock & stratigraphy lithology ‘flows’ Mixed on transfer box to box Transfer core barrel to tray Core tray to sample bag Ground core Core left in core barrel too long Core loss should indicate how much ground away, stick up required Friable ground Cement and redrill Core loss Ground core Cement and redrill Friable / void ground Depth markings Driller’s rule / tape incorrect Get correct length instrument & remark Incorrect from - to recorded Regular reviews by the responsible person Differing core barrel lengths or incorrect lengths used Increased supervision of drillers Incorrect from - to recorded Regular reviews by the responsible person Differing core barrel lengths or incorrect lengths used Increased supervision of drillers The QPs are satisfied with the core logging and reef delineation carried out at Kroondal Operations. These activities are performed by trained geologists who are supervised by experienced geologists. The use of a common manual for core logging and reef delineation and marking ensures consistent core logging and sampling at Kroondal Operations, which facilitates the integration of the datasets during interpretation. 7.5 Survey Data Typically, two survey types are required for each drillhole: • Collar survey and • Downhole survey. Collar surveys for surface holes are usually carried out by a qualified land surveyor, either using trigonometric beacons (historical practice) and triangulation or latterly, by using a differential GPS System. Accuracy is within the 10cm range. Collar surveys for underground holes are usually taken from the nearest survey underground peg and measured using tapes and a clinorule. Accuracy is of the order of 20cm. Downhole surveys typically for surface holes have evolved since the start of exploration. Currently, professional surveyors are contracted to carry out downhole surveys. 60 Photographic Downhole Survey -1930’s to 1990’s (Leutert, Sperry Sun) The magnetic single-shot survey uses a small camera mounted to the drill string which takes photographs of a compass card, and plumb bob which indicates the dip and dip direction of the hole at a particular depth. As only a single shot is taken, the survey must be run several times to get an overall trajectory of the hole. Later developments along the same theme were the magnetic multishot surveys where the film was captured on a roll. See: https://www.drillingmanual.com/2017/12/directional-drilling-surveying-magnetic.html for details. Gyroscope survey Gyroscope surveys were utilised for some of the last surface drillholes to be drilled, around the early to late 2000’s. For a complete description of the method a good reference can be found at: https://www.drillingmanual.com/2017/12/directional-drilling-surveying-gyro.html. Multishot Surveys More recently surveys use Electronic Multishot Surveys which use accelerometers to measure gravity, and therefore inclination, and magnetometers to measure the Earth’s magnetic field at the survey point, and thus declination of the drillhole. Underground Surveys Most of the underground holes are short and are thus not surveyed on the assumption that they do not deviate significantly over short distances. Should a downhole survey be required, a contractor is engaged for this. The QPs are satisfied with the surveying methodology at the Kroondal Operations. These activities are performed by trained surveyors who have sufficient experience with this type of orebody and mining method. The surveys are deemed to be of sufficient quality for use in the Mineral Resource estimation. 7.6 Density Determination All surface exploration holes and underground diamond saw cut channels reef intersections densities are determined in the laboratory using a gas pycnometer. Every sample assayed has density measurement taken. The QPs are aware of the potential overestimation of tonnage and metal content by up to 3% due to the use of the pycnometer density. The defaults were determined by carrying out a classical statistical analysis per stratigraphic unit (length and density weighted). The following default mean densities were applied: • UG2 Leader Seam 3.60 t/m3 • UG2 Leader Seam Parting 3.10 t/m3 • UG2 Main Seam 3.99 t/m3 • UG2 Footwall 3.36 t/m3 • UG2 Norite 2.80 t/m3 61 7.7 Underground Mapping The principal objectives of underground mapping are to: o Identify and record the positions of faults, dykes and any other geological disturbances in a working place so that projections can be made ahead of the face and/or up to reef plane. o Record the thickness and nature of the reef to delineate facies and later reconcile with sampling data. o Record and bring to the attention of the Mining Department any areas where reef remains in the hanging or footwall of the stope and/or new geological structures identified. Mapping is carried out on a routine basis, using a set of documented procedures, and plans updated as data is collected. 7.8 Hydrological Drilling and Testwork Refer to Section 17.5.6 for information on hydrology. 7.9 Geotechnical Data, Testing and Analysis 7.9.1 Data Collection Rock engineering and support designs have been developed using a combination of geotechnical drill core logging and underground mapping data. Geotechnical drill core logging is the primary method of gathering rock strength and quality parameters. Geotechnical logging is completed by sufficiently trained Geologists on drill cores recovered from surface exploration and underground cover and diamond drilling. All geotechnical drilling and logging follow standard procedures inclusive of quality checks and signed off by the respective rock engineers. Geotechnical core logging entails the collection of structural information from the cores. There are many parameters that are recorded during geotechnical core logging, but the following are the main ones. • Depth defining the start of each geotechnical unit • Depth representing the end of each geotechnical unit • Unique identification of each geotechnical unit • Detailed description of the geotechnical feature (type, of plane, number of discontinuities, angle of discontinuity, infill type and integrity, thickness of infill, small scale and large-scale roughness, alteration type). Underground mapping includes scanline mapping techniques, rock mass classification (RMC) data collection techniques and data collected using borehole cameras, Ground Penetrating Radars (GPRs) and Sub-Surface Profilers (SSPs). Rock mass classification data is collected regularly during routine inspections. Scanline mapping and geotechnical core logs by rock engineering personnel are done on an ad-hoc basis. 62 Various tests are then commissioned based on the data obtained from drill core runs and the information derived. Samples from drill cores are sent to the laboratory to determine the properties of intact rock and joint walls. Data is collected from laboratories approved by the International Society for Rock Mechanics (ISRM), South African National Bureau of Standards (SANBS) using ISRM testing techniques. In addition, data is also collected and reviewed from various other sources, including academic research institutions, as well as various internal and external research projects and underground mapping where excavations exist. 7.9.2 Testing Methods There are various methods available to test the material strength of rocks. Two of the most valid, reliable, cost effective and easy to use methods are Rock Quality Designation (RQD) and Point Load Index (PLI). The former provides an estimation of rockmass properties and the latter is designed to give specific rock properties. These are typically conducted as routine tests on site and are performed by site rock engineering and/or geotechnical staff. Where required, International Society for Rock Mechanics and Rock Engineering (ISRM) testing methods are used to assess rock properties at accredited rock testing laboratories in South Africa. These are significantly more expensive than the tests conducted on site and are performed on an adhoc basis. Typically during a feasibility study, and/or where the rock engineer is unsure of specific rock strength or stress data for mine design purposes, will these tests be commissioned. Intact core samples are usually required for such tests and should be handled as per the ISRM sample collection and preparation methods. As the rockmass is not homogeneous, a number of samples are usually submitted for testing and these generate a range of values. The laboratory data is then downgraded (according to specific criteria) for underground in-situ representation for mine design purposes. The information is used to calibrate numerical models for the mine design. As the mine design is being executed, monitoring of the excavations is conducted and the data is used to provide a back analysis of the numerical models. Further optimisation can then be done based on the outcomes of these numerical models. This process is used by all rock engineers in the South African Mining Industry. 7.9.2.1 Rock Quality Designation Rock Quality Designation (RQD) is a standard technique in the Mining and Engineering Industries for the qualitative and quantitative assessment of rock quality using the degree of jointing, fracturing, and shearing in a rock mass. RQD is defined as the percentage of intact drill core pieces recovered that are >10cm for a single core run. It is therefore indicative of a measure of strength of the rockmass and are used for preliminary macro designs. Therefore, low RQDs will indicate low-quality rockmasses which will require additional geotechnical work to understand the rockmass further before any design work continues. Contrary to popular belief, high RQD rockmasses will also generate similar needs for design work as the geophysical and geomechanical properties of rocks and rockmasses are not uniform. The general equation for RQD is expressed as:
63 RQD index (%) = 100 × Σ (Length of core pieces ≥ 0.10 m)/(Total length of core run) 7.9.2.2 Point Load Index (PLI) Summary Point Load (PL) is a test that aims at characterizing intact rock strengths. It is an index test, meaning that it can be performed relatively quickly and without the necessity of sophisticated equipment to provide important data on the mechanical properties of rocks. Many more tests can be conducted in this way, as it does not need a laboratory or perfect rock specimens to perform the tests. The test apparatus consists of a rigid loading frame, a loading measuring system and a simple system of measuring the distance between the two platens. Rock samples are compressed between the platens, which is usually about 1.5-10cms apart so that various sizes of similar rock materials can be tested. The point load index (I s) is the force needed to fracture a sample of rock between conical points: I s = P/D2, where P is force and D is the distance between the points, both at failure. I s is related to uniaxial compressive strength (approximately equal to I s × 24). As such, this test can be used crudely to infer the rock UCS strength value. This technique is not widely used. 7.9.3 Geotechnical Rockmass Characterisation The main aim of geotechnical characterization is to employ the best possible mine design and support rationale to cater for the varying rockmass conditions. Therefore, the appropriate characterization of the rockmass is imperative. The Sibanye-Stillwater Platinum Operations' Mechanized Operations: MANDATORY CODE OF PRACTICE (MCOP) to combat Rockfall and Rockburst Accidents, the MCOP, adopts a geotechnical Ground Control District (GCD) methodology to classify areas of the mine plan with different geotechnical parameters. Typically these would consider, depth, type of reef, thickness of the seams and the relative position thereof, hangingwall types and distances to unstable and less cohesive partings; driving forces from joints, major fault zones and shear zones, minor shears and faults, domes, dykes, IRUP, water, pegmatite intrusions, variations in middling between chromitite layers as a result of rolling reefs and potholes, etc. In some cases, strain release and/or rock bursting may be considered. In the Bord and Pillar operations, the UG2 chromitite Main Seam and the overlying chromitite Leader seam, together with the intervening waste parting, form the mineable reef horizon. The thickness of the Main Seam, the waste parting and the Leader Seam varies across the entire property and in most instances the Leader Seam is mined simultaneously with the Main Seam; however, if the width of the feldspathic pyroxenite parting becomes excessive only the Main Seam is mined, in which case, mining is done along the LT Geotech chromitite parting. The thicknesses of the individual seams that make up the Doublets are also highly variable, as is the distance between the bands forming the Doublets/ triplets horizon. Where the Doublets are situated less than 0.4 m above the top of the Leader Seam, it is mined out, to avoid falls-of-ground. Merensky Reef is not discussed here as none of the Kroondal Operations mined this type of reef during 2021. The majority of the joints are steep dipping. Contributors to major collapses are shallow dipping structures, parting planes and major fault zones. Water generally acts as an accelerator for deterioration 64 in the jointed rock mass. The operations mine through dykes and fault zones that outcrop, with some operations in close proximity to the Hex River. Major geological structures such as the Turfontein shear traverse several operations and ground conditions are challenging characterized by blocky and friable rock mass. Cover holes are drilled in all declines to check for ground water and/or gas. These cover holes are coverage ahead of the advancing excavations. Cover drilling is also done in sections mining towards or through major structures and large potholes. Methods employed to monitor the middling between the various chromitite partings include borehole inspections using borehole cameras, GPRs and SSPs). Current mining depth ranges from 75mbs to 650mbs, which is technically considered ultra-shallow to a shallow depth. At such depth, strategies are aimed at controlling the tensile zone on a regional basis to prevent large scale rock failure and immediate stope hangingwall to prevent local FOGs in the working area. Stress levels are low at shallow depth however, undermining of surface structures is a concern. As such, pillars are designed to support the overburden up to the surface. Kroondal Operations use the Institute of Mine Seismology (IMS) Vantage program to monitor pillar compliance. Reports on Average Pillar Stresses and pillar factors of Safety are generated on a monthly basis and areas of concern are addressed accordingly. Seismicity is not a concern for bord and pillar operations. A tributary of the Hex River, known as the Kroondal tributary, drains to the west across the Kroondal property; however it is seasonal and a minor contributor to the flow of the Hex River. No adverse interactions between the mine workings and the Kroondal tributary have been experienced or are expected. Previous hydrogeological investigations have indicated that there are two main aquifer systems present in the Kroondal orebody: a shallow weathered aquifer between depths of 14 m and 22 m below surface and a deeper, confined weathered and/or rock aquifer at depths ranging from 24 m to 29 m below surface. However, mining currently does not extend to 29 m below surface at Kroondal Operations. Underground working intersects water only in areas mining through major geological structures. 7.9.4 Geotechnical Results and Interpretation Using widely used empirical techniques (Bieniawski’s RMR and Barton’s Q rating), rockmasses are classified and included into the GCDs. Both scanline mapping and RMC data are conducted using industry best practices. The appointed rock engineer is responsible for overseeing the collection and capturing of the data. Instrumentation data collection is done according to the OEM provided training that supplies the equipment. In addition, parameters are assimilated and used to assess the mine design using established, approved and recognized numerical modelling techniques. The visual evidence of hand samples, observations made underground, the results of selective laboratory testing and data from geotechnical instrumentation, show that the dominant hanging wall and footwall rocks to be typical of the Critical Zone rocks found across the western Bushveld summarizes their average material properties. The UCS values summarized in Table 18 show that the rocks are of moderate to high strength as per the ISRM grading. 65 Table 18: Summary of the material properties of the dominant hanging wall and footwall rock types Sample position Triaxial compressive strength UCS Tests Density Strength UCS Tangent elastic modulus @ 50% UCS Poisson's ratio @50%UCS Brazilian tensile strength g/cm³ MPa GPa GPa MPa Reef - UG2 4.16 136.9 133.3 0.32 5.3 Hangingwall - Feldspathic pyroxenite 3.26 156.4 159.0 0.24 18.9 Footwall - Pegmatoidal pyroxenite 3.31 121.9 152.3 0.27 14.8 As we have established, general rockmass conditions are catered for with the use of GCDs. However, in some cases, variations in the middling between the chromitite layers may exist, and data is then collected from surface and underground additional core drilling. This is confirmed using geotechnical instrumentation specific to the investigation required. In the instance of variable stable beam thickness, data from instrumentation is used to refine the original geology isopachs that were historically constructed using surface and underground core drilling. In addition, using underground observations and drill core results, RMR and Q are calculated. Kroondal RMR values range between 50 and 70 (fair to good rockmasses) for the majority of the mining areas. E Anomalies exist closer to major geological intersections where RMR values may be <35. These areas are treated as Special Areas as per the requirements contained in the MCOP. In general, joint properties are generally dry, planar, smooth/rough and with little to no infill for higher RMR values, and for lower RMR values, discontinuities are damp, smooth, planar/undulating and with thick infill as shown in Table 19. Table 19: Rock mass classes determined from RMR total ratings and meaning RMR Ratings 81-100 61-80 41-60 21-40 <20 Rock Mass Class A B C D E Description very good rock good rock fair rock poor rock very poor rock 8 Sample Preparation, Analyses and Security 8.1 Sampling Governance and Quality Assurance The QPs are satisfied with the standard procedures, which prescribe methods aligned to industry norms. The governance system at the Kroondal Operations relies on directive control measures and makes use of internal manuals (standard procedures) to govern and standardize data collection, validation and storage. Furthermore, the standard procedures are mandatory instructions that prescribe acceptable methods and steps for executing various tasks relating to the ongoing gathering, validation, processing, approval and storage of geological data, which is utilised for Mineral Resource estimation. In addition 66 to internal standard procedures, Sibanye-Stillwater implements an analytical quality control protocol that assesses the extent of contamination and analytical precision at the laboratory. Batches of samples sent to the laboratory include routine “blank” samples (Magaliesburg quartzite) and certified reference material (CRM). Results of the analytical quality control are discussed in Section 8.5.2. The governance system also emphasises training to achieve the level of competence required to perform specific functions in data gathering, validation and storage. Lithological data is acquired through the logging of the drill core recovered from the surface and underground drilling. The logging is undertaken by trained geologists, who are familiar with the various reefs, footwall and hanging wall stratigraphy and rock types. The core logging is also guided by existing drillhole information from previous core logging. Routine validations are undertaken by the experienced geologists at various stage gate points in the data collection process flows, with the ultimate validation performed by the QP. Another aspect of the governance system is the documentation of the geological data gathering process flow (i.e., data collection, processing and validation). The QPs acknowledge that this documentation facilitates the auditability of the process flow activities and outcomes as well as the measures undertaken to rectify anomalous or spurious data. Historic surface core is stored at a Central Facility in the Waterval Core yard, near Rustenburg. Storage facilities are secured to prevent unauthorised entry, with limited access. 8.2 Reef Sampling – Surface The surface drilling core is sampled using a comprehensive standard procedure which entails comprehensive QAQC procedures in the process. The core is split in half where one half is retained for reference, whereas the other half is sent to the laboratory for analysis. Samples include bottom and top contacts together with 2cm of footwall and a minimum of 2cm of hangingwall, with the contact samples being no less than 10cm. In addition, at least one sample of unmineralized footwall and hangingwall is included. Samples are broken into individual pieces no less than 20cm for BQ core size to ensure enough material is available for analysis. Furthermore, for BQ size core, the entire drill core sample is submitted to the analytical laboratory and no core splitting is performed. The samples are assigned unique sample identification numbers and tags before the Evaluation Team Leader transports them to the laboratory. In addition, the samples for each drillhole and the associated quality control samples (CRM and blanks) are submitted to the laboratory. The Geologists prepare sample submission sheets that accompany the samples. Records of the sample data are captured in the SABLE database. 8.3 Reef Sampling – Underground 8.3.1 Channel Sampling The data is stored in one database but linked to the assay laboratory automatically via a second system. The following capture process is followed: The sampling data is captured in MRM System which is linked to Sable Database. Sable is used to submitting samples to the laboratory via an automated process. The laboratory uses Laboratory
67 Information Management System (LIMS), which then reports the results automatically back into Sable where QAQC is done. Once QAQC is completed, the information is relayed back into the MRM system. At the Operations, the MRM data is authorised before it is used for evaluation. 8.4 Sample Preparation and Analysis 8.4.1 Laboratory The surface and underground sampling assays are analysed by various ISO-accredited laboratories for the Kroondal Operations. The following International Organisation for Standardisation (ISO) accredited laboratories have been utilised since January 2010: • Anglo American Research Laboratory (‘AARL’), • Genalysis Laboratory Services (SA) (Pty) Limited (‘Genalysis’), • SGS South Africa (Pty) Ltd (‘SGS’), • Mintek (Pty) Limited (‘Mintek’), • SetPoint Industrial Technology (Pty) Limited (‘Setpoint’) and • Quality Laboratory Services Limited (QLS). All current Kroondal samples are analysed at Quality Laboratory Services, an independent South African National Accreditation System (SANAS) accredited laboratory (SANAS17025) for geochemical analysis (4E, 6E plus Ni and Cu). The laboratory has facilities for sample preparation, chemical analysis (via fire assay and instrumental techniques) and is equipped with the LIMS software, which facilitates effective and efficient management of samples and associated data. It handles geological drilling and grade control samples as well as samples from the concentrators. 8.4.2 Sample Preparation and Analysis Samples received at the laboratory are labelled with a unique laboratory identifier and logged. The samples are then emptied into a drying pan and dried to a constant mass in drying ovens at 105°C. After drying, the sample is pulverised to a 95% pass rate on a -75µm and emptied into a labelled sample bag for further processing. Samples are assayed for 6E (i.e. Pt, Pd, Rh, Au, Ru and Ir), Cu, Ni and density. PGMs contained in concentrate samples are collected in a single fusion step, using nickel sulphide (NiS). The resulting NiS buttons are subjected to leaching and filtration processes to separate the PGMs. The PGMs are dissolved using aqua regia. The resulting solutions are analysed by Inductively Coupled Plasma (ICP) to determine the concentrations of Pt, Pd, Rh, Ir, Ru and Au contained in a sample. Cu and Ni are analysed using a sodium peroxide and sodium carbonate fusion to decompose the sample. Nitric acid is added to dissolve the fused sample. The cooled solutions are transferred into labelled 250ml volumetric flasks and send to the ICP for analysis. The determination of density (SG) is achieved by using the AccuPyc 1340 Pycnometer which is a fully automated gas displacement pycnometer. Density and volume are determined by pressure change of helium within calibrated volumes. Assays, including the results from laboratory internal standards, are reported within one to three months turn-around time. 68 QLS has in place quality assurance and control procedures for the analysis and handling of the samples. An overall high level of cleanliness is maintained to minimize contamination. Furthermore, the laboratory also included standards and blanks in each sample batch and any anomaly identified in the quality control samples is addressed as required. The QAQC procedures include regular audits, Proficiency Testing Schemes, round-robin benchmarking, as well as the submission of blanks and standards to the laboratory. 8.4.3 QP Opinion The QPs are satisfied with the sample preparation, analytical methods, accuracy and precision and the level of cleanliness at the analytical laboratory. The analytical methods employed are suited to the mineralisation style and grades. Accordingly, the analytical data from the laboratory is suitable input for grade estimation. Note on historical assays: Fire assay is a well-established procedure and has been used in South African mines for many decades. The procedure has not changed in ways that significantly affect the accuracy and comparability over the life of the mine. 8.5 Analytical Quality Control 8.5.1 Nature and Extent of the Quality Control Procedures Sibanye-Stillwater implements analytical quality control protocol requiring ongoing monitoring of the laboratory performance. Adhoc and unannounced visits are done to the laboratory to check all the processes taking place at the laboratory. 8.5.2 Quality Control Results Analytical results for the blank and standards are analysed graphically on control charts to facilitate the identification of anomalous data points. Where the standard result is reported outside three standard deviations of certificate value – re-assay is requested for the whole batch from the laboratory. A sufficient number of standards and blanks are inserted into the sample stream (equivalent to between 5% and 15% of all samples). Standards consist of in-house standards as well as external “AMIS” CRMs. All in-house standards have been South African Bureau of Standards (“SABS”) certified using a round-robin process. The blank material utilised has no certified value, and the blank sample data is analysed visually on plots to identify anomalous values that may suggest overwhelming contamination or sample swapping. Blank samples are accepted to 0.25g/t, after which re-assay is requested. Figure 21 and Figure 22 show the typical control plots of a CRM and a blank used to assess the quality of assay results. 69 Figure 21: Example of CRM Result Monitoring 2020/2021 70 Figure 22: Example of Blank Result Monitoring 8.5.3 QP Opinion Based on the foregoing, the QP concluded that the laboratory’s analytical data shows overall acceptable precision and accuracy, and no evidence of overwhelming contamination by the laboratory that would affect the integrity of the data. As a result, the analytical data from the laboratories is of acceptable integrity and can be relied upon for Mineral Resource estimation. 9 Data Verification 9.1 Data Storage and Database Management Procedures are in place to ensure the accuracy and security of the databases. All the Kroondal surface diamond drilling and underground channel sampling data is stored using SABLE Data Warehouse software where QAQC data analysis is also carried out. The SABLE database administrator oversees data management procedures while the database manager on-site oversees exploration drillhole data.
71 Data capture is continuous, regularly monitored and validated. Information stored in the database includes collar coordinates, dates of completion of each stage, survey data, lithological logging, alteration logging, structural logging, mineralisation, core size, sampling, CRM information and assay data. The SABLE database is stored on the central IT server, where it is backed up and has rigorous controls (e.g. password protection and access restrictions) to ensure the security and integrity of the data. The QPs are satisfied with data storage and validation as well as database management practices, which are all aligned to industry practice. There are sufficient provisions to ensure the security and integrity of the data stored in the SABLE database. 9.2 Database Verification Internally generated channel samples, surface diamond drilling and mapping data is the primary data utilised for geological interpretation and Mineral Resource estimation. This data has been generated over a lengthy period of time. The imports into the database and validations are performed by experienced personnel. The QPs did not perform independent verifications of the data collected but relied on the rigorous validations performed during data collection and processing to which they participated. The Mineral Resource estimates for the Kroondal Operations are mainly based on validated drillhole and channel data, which is stored in the SABLE database. For the 2021 Mineral Resource estimation at Kroondal Operations, data pertaining to 14,818 data points were used for the UG2 model. 9.2.1 Mapping Mapping is checked underground by the responsible geologist when conducting start-up assessments. The responsible geologist will print a plan when proceeding underground and will ensure that the geological mapping is correct and that all features are recorded. All underground mapping information is captured in the Microstation system. 9.2.2 Drillholes The validation of drillhole data is a continuous process completed at various stages during data collection, before and after import into the SABLE database and during geological interpretation and Mineral Resource estimation. As the QPs are full-time employees of Sibanye-Stillwater working at the Kroondal Operations, they either performed or supervised the validation of the drillhole data after which they approved and signed-off the validated data used for Mineral Resource estimation. The logging is guided by a standard procedure, which standardises data gathering, and the type of detail required for each drillhole log, and any deviations or anomalous entries are flagged by the inbuilt validations tools available in the SABLE database. Geologists validate the survey data by comparing it against planned coordinates and through visual checks in the Datamine environment. 72 9.2.3 Channel Sampling The validation of face samples is a continuous process completed at various stages during data collection. Unique barcoded sample numbers are generated and printed on the surface, preventing duplicate ticket numbers. Samples are captured into the SABLE database with controls in place, which includes drawing of sections and validation of location and geology by experienced full-time employees. Planned Task Observations are conducted quarterly in order to ensure sampling procedures are followed correctly. Planned Task Observations (PTOs) are conducted regularly in order to ensure sampling procedures are followed correctly. 9.3 QP Opinion The QPs acknowledge the rigorous validation of the extensive database utilised for surface drilling and underground evaluation and, ultimately, Mineral Resource estimation at the Kroondal Operations. The data was validated continuously at critical points during collection, in the SABLE database and during geological interpretation and Mineral Resource estimation. For the recent data, the QPs either participated in or supervised the validations which were performed by suitably trained personnel and approved the use of the validated and signed-off data for Mineral Resource estimation. Similar practices which were inherited by Sibanye-Stillwater were in use by the previous owners for the collection historical data. The QPs have assessed the historical data and concluded that it is suitable for Mineral Resource estimation. In general, the data validations are consistent with industry practice and the quantity and type of data are appropriate for the nature and style of the mineralisation. 10 Mineral Processing and Metallurgical Testwork The plant is well established and no changes are planned. Accordingly, there has not been any recent testwork completed for the purposes of process design and metallurgical amenability assessment as these are unnecessary for operating plants. The type of ore material is consistent with historical processing, and any metallurgical testwork conducted is to support short term operational issues. The plant recovery factors are benchmarked to actual recoveries achieved by the plant and there is no material risk to the planned plant recovery factors. There is no metallurgical testwork that is material to the operational this stage of operation. Concentrator Samples are sent to an external laboratory for testing. Refer to Section 8.4.1 for laboratory and analysis details. For mineral processing refer to Section 14 and ongoing sampling in the plant, refer to Section 14.3. 11 Mineral Resource Estimates The following describes the evaluation of the Mineral Resource of the Kroondal Operations which were derived from the underground and surface sources. As the Merensky Reef is mined out, only the UG2 Reef was modelled. 73 NOTE: An integrated Mineral Resource model is constructed combining the UG2 Reef at both the Rustenburg and Kroondal Operations. Mineral Resources are divided and reported within their respective boundaries. 11.1 Estimation Domains Geological interpretations based on structural, thickness and grade data are used to construct the estimation domains (geozones) (Section 6). 11.1.1 Compositing Selection criteria for composites is based on a minimum mining width of 200cm, a well-defined marker horizon(s) in the economic zones and geotechnical requirements of the hangingwall. There is no maximum mining width. While no cut-off grade is used, the areas with variable width are composited to include as much of the mineralized material as possible within the geotechnical constraints. Where the chromitites are less than the minimum mining width the additional thickness is taken in the footwall. For an explanation of why no cut-off grade is used see Section 11.3.2.2 Composites per lithological unit (i.e., drillhole and channel sample data composted by lithology) are used to inform the Mineral Resource model. Composite boundaries are determined by geological contacts and grade distribution for the following five primary UG2 Reef components: • Leader Component • Parting Width Component (internal Waste) • Geotech Component – Chromitite Layers- not always developed • Main Seam • Footwall Unit A minimum thickness of 200cm is modelled for the Kroondal Operations where a high-profile mechanized mining method is applied. The Mineral Resource width for this mining method scenario includes the Main Seam, 10cm (minimum) Footwall Pegmatoid, Leader Seam and parting width between the Main Seam and Leader Seam. Where the entire composite width is less than 200cm, the additional width is made up of incorporating additional material from the Footwall unit. The spatial distribution of the total composite width is shown in Figure 23. In areas where the width exceeds 2.5m the Leader Seam and Leader parting width is removed from the composites and a 2m cut is modelled. 74 Figure 23: Composite Width 11.1.2 Estimation Domains Geological interpretations based on grade and structural data were used to construct the estimation domains (geozones) (Figure 24). The UG2 geozones definition is based on a combination of thickness and the PGM value distribution. The thickness of the UG2 Main Seam between the geozones varies from 71cm to 85cm. A minimum 200cm thick composite was modelled for the mechanised mines where a high-profile mechanized mining method is applied. The variable mining cut includes UG2 main seam, 10cm (minimum) Footwall Pegmatoid, Leader Seam and parting width between the UG2 and Leader. The area of the Mineral Resource blocks was corrected for the dip and discounted for geological losses based on the 3-D structural interpretation. From the resultant dip, corrected area, thickness and density data, volume and tonnage are calculated. Estimation domains were used as hard ( constrained) boundaries in the estimation for the 125m by 125m and 500m by 500m blocks.
75 Figure 24: UG2 Geozones 11.2 Estimation Techniques 11.2.1 Grade and Tonnage Estimation 11.2.1.1 Statistics and Capping The primary software used was Datamine Studio RM for estimation and Snowden Supervisor for statistics and variogram modelling. Based on the width/grade characteristics, the Mineral Resource was divided into various estimation domains (Section 0). Detailed exploratory data analysis included sample verification, histogram and cumulative distribution plots were done per domain. 76 For the UG2 Reef, the main seam, hangingwall and footwall components were composited and modelled individually. These modelled units were then combined to a minimum mining width of 200cm for mechanized bord and pillar Mining method. No declustering was applied for variography given the relatively even data point distribution across the operations. No cutting or capping was applied for the Main Seam grade (4E PGM) and width models because there are no extreme values in the distributions (Figure 25). Capping was only applied for the Prill Element (Pt+Pd+Rh+AU) and Base Metal (Cu+Ni) from the lithological units above and below the Main Seam. Capping was generally applied at the 99th percentile per domain to reduce the effects of extreme high grades on each estimated block. 77 Figure 25: Some Histograms of PGM (PGE) Distributions 11.2.1.2 Variogram Modelling and Estimation Parameter Selection The variography analyses for all components (4E, Prill grades, Ni and Cu) of the individual geozones were conducted using the validated composites for the combined underground channel and surface drillhole data. No transformation of the data was applied to the variograms as the data distribution approaches a normal distribution for thickness and grade where there are sufficient composites. To determine the orientation of the mineralisation for individual domains, variogram maps were created. The variograms were treated as isotropic as there are no trends similar to that extensively done for the 78 PGM reefs within the Bushveld Complex. No convincing anisotropy effect was noticed. Search distances for grade and width estimation were based on variogram ranges for each element (4E, Prill grades, Ni and Cu). Variogram parameters used for kriging are available in Table 20. Search distances for grade and width estimation were based on variogram ranges for each element. Figure 26: Example of a Variogram Map
79 Figure 27: Example of Variogram for 4E Grade for Different Geozones Table 20: Summary of Variogram Model Parameters for all the UG2 Geozones PARAMETER FACIES VREFNUM VANGLE1 NUGGET ST1PAR1 ST1PAR2 ST2PAR1 ST2PAR2 ST3PAR1 ST3PAR2 PGE (g/t) 1 1 -90 0.59 8 8 245.5 245.5 808.5 808.5 PERPLENG (m) 1 2 -90 0.2 61 61 349 349 654.5 654.5 PT (g/t) 1 4 -90 0.71 133 133 467 467 PD (g/t) 1 5 -90 0.55 33.5 33.5 325.5 325.5 RH (g/t) 1 6 -90 0.62 96.5 96.5 583.5 583.5 AU (g/t) 1 7 -90 0.47 34.5 34.5 355.5 355.5 CU (%) 1 8 -90 0.23 70.5 70.5 650.5 650.5 NI (%) 1 9 -90 0.06 88.5 88.5 650.5 650.5 PGE (g/t) 2 11 -90 0.45 37.5 37.5 402 402 729 729 PERPLENG (m) 2 12 -90 0.37 22.5 22.5 83.5 83.5 1273.5 1273.5 PT (g/t) 2 14 -90 0.44 80 80 860.5 860.5 PD (g/t) 2 15 -90 0.57 13.5 13.5 164 164 683 683 RH (g/t) 2 16 -90 0.29 64 64 1488 1488 AU (g/t) 2 17 -90 0.31 113.5 113.5 951 951 80 PARAMETER FACIES VREFNUM VANGLE1 NUGGET ST1PAR1 ST1PAR2 ST2PAR1 ST2PAR2 ST3PAR1 ST3PAR2 CU (%) 2 18 -90 0.22 96 96 1765.5 1765.5 NI (%) 2 19 -90 0.16 129 129 917 917 PGE (g/t) 3 21 -90 0.57 0.15 0.15 207.5 207.5 1837 1837 PERPLENG (m) 3 22 -90 0.38 37.5 37.5 298.5 398.5 1553 1553 PT (g/t) 3 24 -90 0.36 39 39 316.5 316.5 2266.5 2266.5 PD (g/t) 3 25 -90 0.54 28.5 28.5 43 43 1393 1393 RH (g/t) 3 26 -90 0.31 80 80 423.5 423.5 1871 1871 AU (g/t) 3 27 -90 0.5 41.5 41.5 282.5 282.5 812.5 812.5 CU (%) 3 28 -90 0.3 64 64 719 719 2381.5 2381.5 NI (%) 3 29 -90 0.42 46 46 347.5 347.5 2171 2171 PGE (g/t) 4 31 -90 0.61 46.5 46.5 1744 1744 PERPLENG (m) 4 32 -90 0.31 57 57 497.5 497.5 1285 1285 PT (g/t) 4 34 -90 0.4 46.5 46.5 1373 1373 PD (g/t) 4 35 -90 0.52 642.5 642.5 1399 1399 RH (g/t) 4 36 -90 0.32 52 52 321 321 2114 2114 AU (g/t) 4 37 -90 0.49 39.5 39.5 286 286 984.5 984.5 CU (%) 4 38 -90 0.28 44.5 44.5 276.5 276.5 977.5 977.5 NI (%) 4 39 -90 0.31 31 31 404 404 1185 1185 PGE (g/t) 5 41 -90 0.54 64 64 1204.5 1204.5 PERPLENG (m) 5 42 -90 0.62 90.5 90.5 268.5 268.5 1191.5 1191.5 PT (g/t) 5 44 -90 0.61 52.5 52.5 283 283 1251.5 1251.5 PD (g/t) 5 45 -90 0.56 74 74 1088 1088 RH (g/t) 5 46 -90 0.56 71.5 71.5 591 591 1372.5 1372.5 AU (g/t) 5 47 -90 0.39 49 49 1283.5 1283.5 CU (%) 5 48 -90 0.54 52.5 52.5 335 335 NI (%) 5 49 -90 0.48 45 45 1346.5 1346.5 Kriging Neighbourhood Analysis (KNA) is a tool which assists in determining the appropriate estimation parameters as per the examples below. KNA provides appropriate block sizes of 125m x 125m and 500m x 500m blocks (Table 20)and (Table 21). These have positive kriging efficiencies (KE) and slope of regression (SR). The QP decided to use 125m x 125m for the well-informed current mining areas and 500*500m for the deeper areas of the UG2. 81 The KNA for the number of samples for the 125m x 125m blocks provides the KE vs. SR relationship. Table 21: Kriging Parameters Block Size Minimum number of samples Maximum number of samples Search Volume No. 2 Minimum number of samples Maximum number of samples Search Volume No. 3 Minimum number of samples Maximum number of samples Point Data 125m x 125m 7 20 1.5 7 20 50 20 40 Point Data 500m x 500m 7 20 1.5 7 20 50 20 40 11.2.1.3 Interpolation Methods Estimation by ordinary kriging was done for elements with sufficient data and ID (Inverse distance to the power of two) estimates for elements with limited data. No arithmetic mean values were applied to the model blocks. A 2D block modelling approach was used after converting the 3D geological interpretations to 2D. Because faulting is post mineralisation, the 2D estimation is preferred as this removes statistical discontinuities due to faulting. Smaller blocks of 125m by 125m were used in well- informed areas and bigger blocks of 500m by 500m were used in the deeper areas (poorly informed) based on a KNA Study. The QP validated the block models on several levels, including visual checks comparing block grades to composite grades, section plots comparing model grades to actual sampling grades, as well as reconciliations comparing previous estimations to the current estimation. Section plots showing average data grades versus modelled grades are shown in Figure 28. In addition, block comparisons showing the previous vs new models were completed and are shown in Figure 29 and Figure 30. 82 Figure 28: Section Plot UG2 – Data versus Model
83 Figure 29: UG2 Reef Grade -4E –Data versus Model 84 Figure 30: UG2 Reef Grade -4E – Old versus New Model 11.2.1.4 Grade Control and Reconciliation Grade control and reconciliation practices follow similar procedures to those applied elsewhere within the Bushveld Complex platinum mining operations. The reefs, hanging wall and footwall lithologies are visually identifiable, and channel sampling ensures that the face grade is monitored accordingly. As part of the reconciliation exercises, physical factors, including Channel Width, Stoping Width, dilution, and Mine Call Factor (‘MCF’), are monitored and recorded on a monthly basis. These results are used to reconcile Mineral Resource and Mineral Reserve estimates with actual mined tonnages and grades. Monthly evaluation is carried out by means histograms drawn from the Mineral Resource model that evaluate the current mining block against the business plan. Histograms are updated periodically from the Mineral Resource models. Stoping and development is measured monthly to provide an accurate broken ore tonnage and 4E PGM ounces estimate that is compared to the budgeted tonnes hoisted, trammed and milled on a monthly basis. The 4E PGM grade accounted for by the Plant is in turn compared to the Survey Called For grade to determine the Mine Call Factor (‘MCF’). Belt sampling is performed daily at all shafts to verify underground grades. The underlying grade control and reconciliation processes are considered appropriate by the QP. 85 11.3 Mineral Resource Classification 11.3.1 Classification Criteria The Mineral Resource is reported as an in-situ Mineral Resource (reference point) inclusive and exclusive of Mineral Reserves. The Mineral Resource is classified with varying levels of confidence ranging from Measured, high confidence, in current mining and sampling areas to Inferred, lower confidence, in areas further away from current workings whilst Indicated lies between these two categories. Table 22 shows several factors considered in applying confidence measurements to the Mineral Resource. The Mineral Resource categorisation is based on the robustness of the various data sources available, confidence of the geological interpretation, variography and various estimation parameters (e.g., distance to data, number of data, maximum search radii etc.). The Mineral Resource Classification is determined using the classification matrix method, which has been implemented across the PGM segments of Sibanye-Stillwater. It consists of various geological and statistical parameters. The following geological parameters are considered into the different frameworks. Figure 31 depicts the Mineral Resource Classification for the UG2 Reef. There was no material change from the previous estimate. An extensive surface and underground exploration drilling programme completed previously resulted in more Measured Resource that is defined for the UG2 Reef beyond the current mining areas. Mineral Resource blocks are estimated for 4E grade, thickness, accumulation (product of grade and thickness), density and in addition base metals; Cu and Ni, Cr and 6E prill splits (Pt, Pd, Rh, Ir, Ru and Au). Mineral Resource estimates are classified and reported for 4E, and 4E prill grades and tonnage. Several attributes, like classification and geological loss, are allocated to the Mineral Resource blocks. The tables in this section summarize the Mineral Resources. The terms and definitions of Mineral Resources are those given by Subpart 1300 of Regulation S-K. 86 Table 22: Confidence Levels for Key Criteria for Mineral Resource Classification Items Discussion Confidence Aeromagnetic survey Aeromagnetic data and interpretation are available and are of reasonable quality and has been derived from internationally recognised and procedures and techniques. High Seismic interpretation Seismic data is available and data is of reasonable quality and has been derived from internationally recognised procedures and techniques. High Structural model Stratigraphic definition and delineation are considered of reasonable quality. Major structures are identified. High Geozones interpretation Geozones definition and delineation are considered of reasonable quality. High Historical data Available historical data is of reasonable quality and has been derived from internationally recognised procedures and techniques. High Assay - QAQC A comprehensive QAQC program was employed. QAQC monitoring is in place and regular follow-ups occur with the mine laboratory. Moderate to High Kriging variance Parameter is based on the standardized kriging variances (KV). Ranked values assigned are where KV<0. 2, the ranked value is given a value of 1 (high confidence); where 0.2≤KV<0.4, a value of 2 is assigned; and where KV≥0.4, a value of 3 is applied (low confidence). Moderate Kriging efficiency Ranked values for kriging efficiency assigned are where KE≥0.5, the ranked value is given a value of 1 (high confidence); where 0.3<KE<0.5, a value of 2 is assigned; and where KE≤ 0.3, a value of 3 is applied (low confidence). Moderate Search volume Ranked values assignment are: first search radii = 1 (high confidence); second search radii = 2; third search radii = 3. High Number of samples The range between the minimum and maximum number of samples is divided into three and assigned values of 1, 2 and 3 where 1 would represent the maximum number of samples interval. High Regression slope Ranked values assigned are where RS≥0.6 the ranked value is given a value of 1 (high confidence); where 0.2<RS<0.6, a value of 2 is assigned; and where RS≤0.2 a value of 3 is applied (low confidence). Moderate
87 Figure 31: Mineral Resource Classification for UG2 11.3.2 Mineral Resource Technical and Economic Factors 11.3.2.1 Mining Width and Paylimit The minimum mining width, which represents the minimum practical selection unit, is dependent largely on the mining method and other mining constraints, including rock engineering. The Mineral Resource tabulations are discounted for geological losses. Geological losses can be segregated into known and unknown losses. Typically, faults and dykes, which have been positioned through various exploration/exposure methods, can be reasonably quantified as known losses and with high or medium degrees of confidence. Where the measurements become 88 conjectural, then these losses become low confidence and would then form part of the unknown loss quantification. Geological losses for the Kroondal Operations UG2 were estimated and signed off by the QP with the assistance of respective Shaft Geologists and Central Geologists per structural domain for each shaft. Losses are estimated in the underground mining operations and are then projected into the future mining areas. Additional data sources that include aeromagnetic survey, seismic interpretation and borehole information are also used for the projected loss. In summary, the UG2 total weighted average geological loss at the Kroondal Operations for the remnant Mineral Resource is 29.85% and represents a 0.2% increase from the previous year’s geological losses. 11.3.2.2 Paylimits and Cut-off Grade Historically, SSW has not applied cut-off grades in their Mineral Resource/Mineral Reserve declaration. No cut-off grade is applied to the Mineral Resources quoted due to there being no mining selectivity based on the grades being applied at any of the Shafts at Kroondal. The ore bodies are continuous and have persistent metal distribution profiles which has been used as the basis for reef identification, modelling and exploitation. To illustrate the prospects of eventual economic extraction at the Mineral Resources cut-off grade, calculations were made based on economic, mining and processing assumptions. The metal prices assumed in the calculation are the long-term prices (as at 2022) in Table 23. See Section 16.4 for a discussion on price determination. Table 23: Commodity Price and Exchange Rate Assumptions for Cut-off Calculations 6E Metals Units Long Term Prices 2022 Platinum USD/oz 1,500 Palladium USD/oz 1,500 Rhodium USD/oz 10,000 Gold USD/oz 1,800 Iridium USD/oz 3,000 Ruthenium USD/oz 350 ZAR/USD 15.00 A basket price for the 6E metals was calculated by weighting each price by the metal’s contribution to the 6E value for each reef package per individual operation. The contribution of base metals was not considered. The prill splits used per operation are shown in Table 24. 89 Table 24: 6E Prill Split Percentages Applied per Reef Kroondal UG2 (Proportion) Platinum 0.49 Palladium 0.26 Rhodium 0.08 Gold 0.01 Iridium 0.03 Ruthenium 0.13 Certain parameters were used in the cut-off calculations and include both mining and processing assumptions below and in Section 12.4. The first factor used is the Mineral Resource to Mineral Reserve factor and is calculated by factoring in the percentage of grade lost in the conversion from Mineral Resource to Mineral Reserve grade. Typically this would be due to dilution, Mine Call Factor and other modifying factors applied to the Mineral Resource. Concentrator recoveries used were based on 2022 budgeted figures per reef type, per operation and represent the average concentrator recovery for the total operation. Net smelter returns are assumed to be the same across the operations, although the material is processed at different facilities. The total mining cost applied per operation were the costs declared in the December 2021 Mineral Resource and Mineral Reserve declaration and were assumed to be the same for both reef types. The parameters assumed for the cut-off calculation for the MR and UG2 packages are detailed in Table 25. Table 25: Parameters used in the cut- off calculation for the MR and UG2 Reef Operation Parameters Unit UG2 Kroondal Total Mining Cost ZAR/t 896 Mining Recovery % 57 Plant Recovery % 83 Net Smelter Return % 99 MCF % 95 Based on the parameters assumed above for the cut-off calculation for the UG2 package, the following cut-off grade was calculated for the Kroondal Operations and these are detailed in Table 26. The 6E grades were used in the calculation and reported here as 4E. 90 Table 26: 4E Cut-off grades calculated for the UG2 Reef and surface operations Kroondal MER UG2 Surface (TSF) Cut-off grade (4E g/t)) - 1.68 - The Mineral Resource tonnes and metals available at the cut-off grades calculated is no different from what is obtained using a 0 g/t cut-off grade. The UG2 Mineral Resources have no tonnes or metals below the cut-off. Due to this, all available blocks are reported to be available for mining. 11.4 Mineral Resource Statements Mineral Resources are stated as both Exclusive (Table 28 and Table 29) and Inclusive of Mineral Reserves (Table 30 and Table 31). Mineral Resources are estimates of in-situ mineralisation (reference point) assessed to have reasonable prospects for economic extraction by the QP. These include Mineral Resources at the Klipfontein Open-Pit and underground Mineral Resources at the shafts. The Mineral Resource as stated is not sensitive to changes in the PGM basket price, nor the ZAR/USD exchange rates. Therefore no sensitivity analysis has been completed for Mineral Resources. The Prill Split for the Mineral Resources is given in Table 27. Table 27: Prill Split of the area covered by Mineral Resource as at 31 December 2021 Reef Pt % Pd % Rh % Au % UG2 57.84 31.37 10.08 0.71 Notes on the Mineral Resource Tabulations: • Mineral Resources are not Mineral Reserves. • Mineral Resources have been reported in accordance with the classification criteria of Subpart 1300 of Regulation S-K. • Attributable Mineral Resources are 50%. • Mineral Resource is calculated on available blocks. Due to non-selective mining, no cut-off grade is applied, no recovery is considered at this stage • AI = Above Infrastructure; BI = Below Infrastructure • Mineral Resources are reported after the removal of geological losses. • Quantities and grades have been rounded to one decimal place; therefore minor computational errors may occur. • Technical and economic factors are discussion in Section 11.3.2. • Risks are discussed in Section 21.
91 Table 28: Mineral Resources Exclusive of Mineral Reserves at 100% Classification – 4E Tonnes (Mt) 4E Grade (g/t) 4E (Moz) 21-Dec 20-Dec 21-Dec 20-Dec 21-Dec 20-Dec Underground Measured (AI) 31.5 34.1 3.4 3.4 3.4 3.7 Measured (BI) 0.0 0.0 0.0 0.0 0.0 0.0 Indicated (AI) 9.5 9.5 3.8 3.8 1.2 1.2 Indicated (BI) 0.0 0.0 0.0 0.0 0.0 0.0 Total Measured and Indicated 41.1 43.5 3.5 3.5 4.6 4.9 Inferred (AI) 4.9 4.9 3.0 3.0 0.5 0.5 Inferred (BI) 0.0 0.0 0.0 0.0 0.0 0.0 Total Underground 46.0 48.5 3.4 3.4 5.1 5.4 Total (AI) 46.0 48.5 3.4 3.4 5.1 5.4 Total (BI) 0.0 0.0 0.0 0.0 0.0 0.0 Surface Measured Open-pit 0.0 0.0 0.0 0.0 0.0 0.0 Total Surface 0.0 0.0 0.0 0.0 0.0 0.0 Total Resource 46.0 48.5 3.4 3.4 5.1 5.4 Table 29: Attributable Mineral Resource Exclusive of Mineral Reserves as at 31 December 2021 Classification – 4E Tonnes (Mt) 4E Grade (g/t) 4E (Moz) 21-Dec 20-Dec 21-Dec 20-Dec 21-Dec 20-Dec Underground Measured (AI) 15.8 17.0 3.4 3.4 1.7 1.9 Measured (BI) 0.0 0.0 0.0 0.0 0.0 0.0 Indicated (AI) 4.8 4.7 3.8 3.8 0.6 0.6 Indicated (BI) 0.0 0.0 0.0 0.0 0.0 0.0 Total Measured and Indicated 20.5 21.8 3.5 3.5 2.3 2.4 Inferred (AI) 2.5 2.5 3.0 3.0 0.2 0.2 Inferred (BI) 0.0 0.0 0.0 0.0 0.0 0.0 Total Underground 23.0 24.2 3.4 3.4 2.5 2.7 Total (AI) 23.0 24.2 3.4 3.4 2.5 2.7 Total (BI) 0.0 0.0 0.0 0.0 0.0 0.0 Surface Measured Open-pit 0.0 0.0 0.0 0.0 0.0 0.0 Total Surface 0.0 0.0 0.0 0.0 0.0 0.0 Total Resource 23.0 24.2 3.4 3.4 2.5 2.7 92 Table 30: Mineral Resources Inclusive of Mineral Reserves at 100% Classification – 4E Tonnes (Mt) 4E Grade (g/t) 4E (Moz) 21-Dec 20-Dec 21-Dec 20-Dec 21-Dec 20-Dec Underground Measured (AI) 53.6 61.5 3.3 3.3 5.7 6.5 Measured (BI) 0.0 0.0 0.0 0.0 0.0 0.0 Indicated (AI) 9.5 9.5 3.8 3.8 1.2 1.2 Indicated (BI) 0.0 0.0 0.0 0.0 0.0 0.0 Total Measured and Indicated 63.1 70.9 3.4 3.4 6.8 7.7 Inferred (AI) 4.9 4.9 3.0 3.0 0.5 0.5 Inferred (BI) 0.0 0.0 0.0 0.0 0.0 0.0 Total Underground 68.0 75.9 3.3 3.3 7.3 8.1 Total (AI) 68.0 75.9 3.3 3.3 7.3 8.1 Total (BI) 0.0 0.0 0.0 0.0 0.0 0.0 Surface Measured Open-pit 2.0 2.6 4.3 3.7 0.3 0.3 Total Surface 2.0 2.6 4.3 3.7 0.3 0.3 Total Resource 70.0 78.5 3.4 3.3 7.6 8.5 Table 31: Attributable Mineral Resource Inclusive of Mineral Reserves as at 31 December 2021 Classification – 4E Tonnes (Mt) 4E Grade (g/t) 4E (Moz) 21-Dec 20-Dec 21-Dec 20-Dec 21-Dec 20-Dec Underground Measured (AI) 26.8 30.7 3.3 3.3 2.8 3.3 Measured (BI) 0.0 0.0 0.0 0.0 0.0 0.0 Indicated (AI) 4.8 4.7 3.8 3.8 0.6 0.6 Indicated (BI) 0.0 0.0 0.0 0.0 0.0 0.0 Total Measured and Indicated 31.6 35.5 3.4 3.4 3.4 3.8 Inferred (AI) 2.5 2.5 3.0 3.0 0.2 0.2 Inferred (BI) 0.0 0.0 0.0 0.0 0.0 0.0 Total Underground 34.0 37.9 3.3 3.3 3.7 4.1 Total (AI) 34.0 37.9 3.3 3.3 3.7 4.1 Total (BI) 0.0 0.0 0.0 0.0 0.0 0.0 Surface Measured Open-pit 1.0 1.3 4.3 3.7 0.1 0.2 Total Surface 1.0 1.3 4.3 3.7 0.1 0.2 Total Resource 35.0 39.3 3.4 3.3 3.8 4.2 93 Figure 32: Conversion of Mineral Resource to Mineral Reserve For the Kroondal Operations Mineral Resource to Mineral Reserve Reconciliation(Figure 32), the starting point shows the total Attributable Mineral Resource for the Kroondal Operations (after removal of geological loss) and includes the Kroondal-Marikana Shafts on care and maintenance. The 2.5Moz removed are Mineral Resource areas on care and maintenance, future mining areas, and boundary pillars between shafts or areas removed due to adverse geological structure. The pillars component is based on an average calculation for designed pillars for all operating shafts. Modifying factors as discussed in Section 11, may be either a gain or loss of Mineral Resource and for summary purposes have been included into one item. The MCF at Kroondal averages 95% and makes up the total MCF loss in the reconciliation. Total Mineral Reserves declared are after removal of MCF losses. 11.4.1 Mineral Resources per Mining Area (Inclusive of Mineral Reserves) Figure 33 shows the remaining Mineral Resources with respect to infrastructure. All mined out areas are shown in grey. Refer to Table 32 for the Full Mineral Resource(100%) statements per mining area at 31 December 2021. 94 Figure 33: Rustenburg and Kroondal UG2 Reef Accessibility
95 Table 32: Mineral Resource Inclusive of Mineral Reserves per Mining Area as at 31 December 2021 at 100% 4E PGM per Mining Area Measured Indicated Inferred Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Kwezi 6.1 3.2 0.6 0 0 0 0 0 0 K6 3.1 3.1 0.3 0 0 0 0 0 0 Kopaneng 1.9 2.9 0.2 0 0 0 0 0 0 Simunye 0.9 3.0 0.1 0 0 0 0 0 0 Bambanani 17.4 3.2 1.8 0 0 0 0 0 0 Marikana 24.2 3.4 2.7 9.5 3.8 1.2 4.9 3.0 0.5 Total Underground 53.6 3.3 5.7 9.5 3.8 1.2 4.9 3.0 0.5 Total: Surface Open-pit 2.0 4.3 0.3 Grand Total (Underground and Surface) 55.6 3.3 5.9 9.5 3.8 1.2 4.9 3.0 0.5 96 11.4.2 Changes in the Mineral Resources from Previous Estimates (Inclusive of Mineral Reserves) The 2021 estimation varies from the 2020, as shown in the waterfall (Figure 34). Mineral Resource depletion due to mining is 0.86 Moz. Changes due to geological losses, new data and area exchange between mines resulted in a decrease of 0.07 Moz. There were no material changes to the estimation or classification parameters between December 2020 and December 2021. Figure 34: Kroondal Operations Underground and Surface Mineral Resource Reconciliation 11.5 QP Statement on the Mineral Resource Estimation and Classification The Mineral Resources declared are estimated based on the geological facies (geozones) and constrained by appropriate geostatistical techniques, using Ordinary Kriging for elements with sufficient data and ID (Inverse distance to the power of two) estimates for elements with limited data. The Mineral Resource classification follows geostatistical and geological criteria developed by Sibanye-Stillwater for PGM Mineral Resource classification. The Mineral Resources are declared inside the structural blocks and outside of the mined-out areas. All Mineral Resources reported are considered to be of sufficient quality to justify a reasonable prospect for economic extraction. The underlying grade control and reconciliation processes are considered appropriate. 97 It is the QP’s opinion that all issues relating to any technical or economic factors that would be likely to influence the condition of reasonable prospects for economic extraction are addressed or can be resolved with further work. 12 Mineral Reserve 12.1 Mineral Reserve Methodology This section includes discussion and comments on the conversion of Mineral Resources to Mineral Reserves. Specifically, the comment is given on the modifying factors, specific inclusions and exclusions. Section 12.4.2 and Table 35 provide details of the LoM plan from C2022 to C2041. 12.2 Mine Planning Process The following planning process applies at the Kroondal Operations: • Appoint and ensure competence in mine planning responsibilities per section • Consider planning cycle for which plan is to be prepared • Obtain an updated geological structural model for design purposes • Obtain/determine future planning levels for the Operation. Identify output levels for the Operation (4E target/tonnage required, development targets) • Break these down per individual operating level • Liaise with all Senior Vice Presidents, Vice Presidents of Operations and business unit management teams and brief anticipated production levels and efficiency rates • Evaluate historical efficiencies against future planned efficiencies and reach an agreement of planning performance levels • Provide base plans for each business unit and determine numbers of crews and scheduling systems per business unit • Document and file all tunnel dimensions and advance rates • Review tunnel dimensions with Ventilation, Rock Engineering, Evaluation and Mining Engineering teams • Agree and reach consensus on all stoping layouts, ledging and extraction sequencing/methodologies • Review and sign-off with all appropriate Mining Unit Management Teams • Document the planned parameters in a shaft or unit planning brief • Commence designing of mine plan. Specify capital and preferably separate individual elements for later revision. Ensure naming of working place, etc. • Review development and stoping mine design with appropriate business unit management team members and ancillary support staff, including Mineral Resource Management department competencies • Modify if required, or accept and commence with scheduling based on agreed scheduling parameters per area • Review schedules and outputs in terms of production with Vice Presidents of Operations to ensure appropriate levels of production and volume efficiencies are obtained for that unit • Communicate with all service staff (occupational health (environmental ventilation), rock engineering), and engineering for shaft capacities 98 • Modify and revise as required with appropriate staff • Consolidate all sections to create an overall operational performance plan • Run evaluation module/grid and determine 4E output • Provide shaft or unit-based data in terms of volume and grade into the acceptable standard database and reporting format • Review total plan with MRM staff competencies heads • Revise and review again if required • Submit for final review with Senior Vice Presidents and Vice Presidents of Operations to ensure operational targets and performance levels are reached • Submit to the Unit Manager Mine Planning to prepare an appropriate format and for submission to the Financial Department for total mine financial evaluation • Identify all areas where differences in design can or may require additional feasibility study work in the future. These would include declines, new shafts, and alternative layouts. Generate cost models in conjunction with the Project Office • Review mining plan with rock engineers and provide data sets for design modelling. Obtain the support of acceptance of plan as far as rock engineering is concerned • Review mining plan with occupational health (ventilation) engineers and provide data sets for design modelling. Obtain written support of acceptance of plan as far as occupational health is concerned • Review with all mining engineering staff and gain acceptance and commitment to plan. Generate and provide appropriate schedules and plans for all Manager Operations • Consider alternative scenarios relating to rates of advance, alternative layouts, and risk mitigation • Formally document all capital projects and compile consolidated project reports for each project • Reconcile the planning Mineral Reserves per shaft with scheduled and designed Mineral Reserves and account for all differences. Modify the plan to eliminate all differences. This reconciliation is an MRM competency head process • Prepare Operational/ Strategic Plan presentation to SA Regional EXCO. • Modify and amend where required • Complete final cycle of the planning process and document all parameters. Make a digital backup of the Mineral Reserve model, design model, schedule model, and all associated worksheets/presentation • Roll out and communicate the final plan to all Business Units with prints of appropriate plans and spreadsheets. Confirm and identify all critical development and • Review and modify on a monthly basis actual achievement vs planned volumes. 12.3 Historical Mining Parameters The planning parameters are primarily based on historical achievements. Table 33 provides the historical mining performance for the Kroondal Operations, where mining expenditures are stated in nominal terms. Historical mining statistics for the shafts from 2016 to 2021, as well as historical averages are presented in Table 33.
99 Table 33: Historical Mining Statistics by Section Shaft Units C2016 C2017 C2018 C2019 C2020 C2021 Kwezi Primary Reef Development (m) 1.816 2.498 2.3 2.984 1.432 1.909 Primary Waste Development (m) 841 1.258 234 92 325 137 Stoping Square metres (m2) 190.661 202.384 225.535 225.907 159.417 157.314 Tonnes Milled (kt) 1,542,806 1,728,944 1,815,711 1,782,043 1,272,974 1,235,744 4E ounces M&C (oz) 111.49 115.503 123.132 118.941 86.237 79.45 K6 Primary Reef Development (m) 3.485 2.815 2.188 2.147 1.378 1.653 Primary Waste Development (m) 50 602 294 34 78 0 Stoping Square metres (m2) 145.469 158.906 190.13 197.268 148.749 199.43 Tonnes Milled (kt) 1,395,966 1,518,174 1,551,859 1,720,374 1,317,954 1,659,802 4E ounces M&C (oz) 93.656 102.317 107.218 116.578 88.898 112.122 Simunye Primary Reef Development (m) 1.908 1.861 1.84 1.443 196 0 Primary Waste Development (m) 151 387 247 99 657 110 Stoping Square metres (m2) 146.726 176.503 201.992 208.728 161.127 191.503 Tonnes Milled (kt) 1,454,280 1,559,010 1,648,784 1,729,519 1,256,323 1,433,651 4E ounces M&C (oz) 86.21 96.397 107.28 109.348 78.894 92.325 Bambanani Primary Reef Development (m) 2.551 2.336 2.23 2.593 2.198 2.056 Primary Waste Development (m) 1.409 562 256 - - 45 Stoping Square metres (m2) 126.069 134.782 151.102 155.371 119.803 146.005 Tonnes Milled (kt) 1,324,009 1,233,074 1,144,517 1,199,372 924.955 1,117,356 4E ounces M&C (oz) 85.901 78.411 76.547 83.202 63.515 71.526 Kopaneng Primary Reef Development (m) 1.818 2.068 2.266 2.668 1.824 1.809 Primary Waste Development (m) 516 442 79 44 276 791 Stoping Square metres (m2) 159.938 168.238 187.997 195.775 143.428 189.516 Tonnes Milled (kt) 1,482,254 1,516,846 1,569,211 1,688,472 1,221,591 1,560,841 4E ounces M&C (oz) 94.153 89.821 96.271 101.742 76.151 95.672 Total Underground Kroondal Operations Primary Reef Development (m) 11.577 11.578 10.823 11.835 7.028 7.428 Primary Waste Development (m) 2.967 3.252 1.109 269 1.336 1.083 Stoping Square metres (m2) 768.863 840.814 956.756 983.048 732.524 883.855 Tonnes Milled (kt) 7,199,315 7,556,048 7,730,083 8,119,781 5,993,797 7,007,395 4E ounces M&C (oz) 471.41 482.449 510.448 529.811 393.695 451.096 100 12.4 Shaft and Mine Paylimits 12.4.1 Paylimits • No paylimits are applied to the Mineral Resources and Mineral Reserves. There is no mining selectivity based on the grades applied at any of the Shafts at Kroondal Operations. • With the UG2 Reefs having low grade variability, all available blocks are reported to be mined, essentially a blanket mining approach is applied. • Refer to section 11.3.2 for more information on paylimits and cut-off grades. 12.4.2 Modifying Factors Table 34 provide details of the projected modifying factors. Table 35 presents the LoM plan. Dilution is variable across the property and is included in the stope tramming width. A separate dilution factor is not used as a modifying factor. The Mineral Reserve classification of Proved and Probable was largely a function of the Mineral Resource classification with due consideration of the minimum criteria for the “Modifying Factors” as considered: • Mining • Metallurgical • Processing • Infrastructural • Economic • Marketing • Legal and Environmental, social and governmental factors. 101 Table 34: Mineral Reserve Modifying Factors Kroondal Unit C2019 C2020 C2021 C2022 Survey Called For Grade UG2 Reef g/t 2.6 2.6 2.6 2.5 Total g/t 2.6 2.6 2.6 2.5 Stope Tramming Width UG2 Reef (cm) 223 222 223 225 Total (cm) 223 222 223 225 Waste Mining Percentage UG2 Reef (%) 4 4 7 7 Total (%) 4 4 7 7 Scalping UG2 Reef (%) 3 3 4 Total (%) 3 3 4 Reef Development to Mill UG2 Reef (%) 7 6 7 Total (%) 7 6 7 Mine Call Factor UG2 Reef (%) 93 93 95 95 Total (%) 93 93 95 95 Plant Recovery Factor UG2 Reef (%) 82 83 83 83 Total (%) 82 83 83 83 . 102 Table 35: LoM Plans – Current Operations 2022-2037 Kroondal Operations Units LoM C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 C2030 C2031 2032- 2036 2037- 2041 1 2 3 4 5 6 7 8 9 10 11-14 15-19 Underground Primary On-Reef Development (m) 27,285 7,730 7,262 6,158 3,303 1,340 1,015 477 - - - - - Primary Off-Reef Development (m) 3,455 1,077 718 982 30 647 - - - - - - - Mill Tonnes** (kt) 41,322 5,757 4,983 5,072 5,327 4,670 3,534 1,838 1,272 1,269 1,242 5,474 885 4EOunces in Mill Feed (kOzt) 3,353 448 392 407 428 372 287 152 107 109 104 471 76 Recovery (%) 83.2 82.7 82.8 82.8 83 83 83.3 83.4 83.8 84.1 83.7 84.2 84.2 Yield (g/t) 2.10 2 2.03 2.07 2.07 2.06 2.1 2.14 2.18 2.24 2.17 2.25 2.26 4E Produced (kOzt) 2,791 371 325 337 355 309 239 127 89 92 87 396 64 Surface Mill Tonnes (kt) 1,667 580 601 441 - 4EOunces in Mill Feed (kOzt) 176 56 59 56 - Recovery (%) 70.6 67.7 68.3 75.4 - - - - - - - Yield (g/t) 2.31 2.02 2.08 2.96 - - - - - - - 4E Produced (kOzt) 124 38 40 42 - Total Mine Mill Tonnes (kt) 42,989 6,337 5,584 5,513 5,372 4,670 3,534 1,838 1,272 1,269 1,242 5,474 885 4EOunces in Mill Feed (kOzt) 3,528 504 451 463 434 372 287 152 107 109 104 471 76 Recovery (%) 82.6 81.1 80.9 82 82.9 83 83.3 83.4 83.8 84.1 83.7 84.2 84.2 Yield (g/t) 2.11 2 2.03 2.14 2.08 2.06 2.1 2.14 2.18 2.24 2.17 2.25 2.26 4E Produced (kOzt) 2,914 408 365 379 359 309 239 127 89 92 87 396 64 **Includes tonnage from Rustenburg Mine accessed through the Kroondal infrastructure see Section 21 for more information.
103 12.5 LoM Projects The only major project is the Klipfontein Open-Pit project which lies to the South of the Bambanani Underground operations. This area was historically overlain by the Klipfontein Tailings Storage Facility (TSF). This TSF has been removed during the reprocessing thereof and has created the opportunity to exploit this shallow Mineral Resource by means of open-pit mining methods. The Klipfontein open-cast project was approved by the Board and is included in the Mineral Reserves. 12.6 Specific Inclusions and Exclusions The decision on whether to include or exclude potential mining areas is based on a detailed review, which includes: • Health and safety considerations • Economic viability • Technical justification • Ability to mine the area and • Infrastructure availability constraints. All areas included in the LoM plan are mined from the current infrastructure and are a normal continuation of mining. 12.6.1 Specific Exclusions: • Areas with adverse ground conditions after evaluation by Rock Engineering and other service departments and mining • OFF REEF areas where there is no other need requirement such as ventilation or infrastructure. 12.6.2 Specific Inclusion: Areas required for Ventilation or specific infrastructure development. 12.7 Mineral Reserve Estimation The tonnage and grades scheduled in Measured Mineral Resources classified as Proved and those in the Indicated Measured Mineral Resources classified as Measured. No Measured Mineral Resources were converted to Probable Reserves. The Mineral Reserve estimation process at the Kroondal Operations is based on the development of an appropriately detailed and engineered LoM plan, which accounts for all necessary access development and stope designs. The terms and definitions are in accordance with the classification criteria of Sub-part 1300 of Regulation S-K. Further, in presenting the Mineral Reserve statements and associated sensitivities, the following applies: • All Mineral Reserves are quoted as of 31 December 2021 • All Mineral Reserves are quoted at prices listed in Table 51 in Section 16.4 • Mineral Reserves are attributable at 50% with respect to ownership 104 • All Mineral Reserves are quoted in terms of the expected RoM grades and tonnage delivered to the metallurgical processing facilities, and therefore the quantities reported account for dilution • Mineral Reserve statements include only Measured and Indicated Mineral Resources modified to produce Mineral Reserves, and contained in the LoM plan • All Mineral Reserves are evaluated to at least a Prefeasibility level within cost limits as given in section 18 and • All references to Mineral Resources and Mineral Reserves are stated in accordance with Subpart 1300 of Regulation S-K. The Mineral Reserves are derived following the production of a LoM plan by incorporating Modifying Factors into the Mineral Resource model. All design and scheduling work is undertaken within Cadsmine, a mine planning and scheduling program. The planning process incorporates appropriate Modifying Factors based on the reconciliation exercises described and technical economic investigations. The mill tonnes are quoted as the expected mill delivered metric tonnes and RoM, grades, inclusive of all mining dilutions and 4E losses except mill recovery. Mine dilution includes other material, which is waste that is broken on the mining horizon, other than on the stope face and includes unknown geological losses. 105 Figure 35: Mineral Reserve Classification as at 31 December 2021 – UG2 Reef (includes adjacent mines of registrant) For Kroondal outline, please see the Figure 3. 106 12.8 Surface Sources Surface sources in the Kroondal Operations context refer to reef tonnage from the Klipfontein Open-Pit operation. 12.9 Mineral Reserves Statement The Mineral Reserve is declared separately for underground and surface sources. The Prill Split for the Mineral Reserves is given in Table 36. The Mineral Reserves are given in Table 37 and Table 38. Mineral Reserve per shaft is given in Table 39 and Table 40. Figure 36 shows the main changes year on year are due to various factors. Notes on the Mineral Reserve Tables • Mineral Reserve was reported in accordance with the classification criteria of Regulation S-K 1300. • Mineral Reserve was estimated on all available blocks accessible from the infrastructure and no cut-off grade was applied. • Attributable Mineral Reserve is 50.00%. • Where Au grade is less than 0.05g/t, the value will reflect as zero(0) in the table • Where 4E, Pt, Pd, Rh, Au is less than 0.05Moz, the value will reflect as zero(0) in the table. • Mineral Reserves are estimated using the prices in Section 16.4. • The average recovery factor for the UG2 is 83% (Section 12.4.2). • Risks are discussed in Section 21.1.2. Table 36: Prill Split and Recovery for Mineral Reserves Prill Split Pt Pd Rh Au Recovery % % % % % Merensky - - - - - UG2 57.84 31.37 10.08 0.71 83% Combined (weighted average) 57.84 31.37 10.08 0.71 83%
107 Table 37: Mineral Reserve as at 31 December 2021 at 100% Classification - 4E PGM Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Dec-21 Dec-20 Dec-21 Dec-20 Dec-21 Dec-20 Underground Proved 19.1 24.1 2.5 2.6 1.6 2.0 Probable 0.0 0.0 0.0 0.0 0.0 0.0 Total Underground 19.1 24.1 2.5 2.6 1.6 2.0 Surface Open-pit Proved Open-pit 1.7 1.7 3.3 3.3 0.2 0.2 Probable Open-pit 0.0 0.0 0.0 0.0 0.0 0.0 Total Surface 1.7 1.7 3.3 3.3 0.2 0.2 Total Proved 20.8 25.7 2.6 2.6 1.7 2.2 Total Probable 0.0 0.0 0.0 0.0 0.0 0.0 Total Reserve 20.8 25.7 2.6 2.6 1.7 2.2 Table 38: Attributable Mineral Reserve as at 31 December 2021 at 50% Classification - 4E PGM Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Dec-21 Dec-20 Dec-21 Dec-20 Dec-21 Dec-20 Underground Proved 9.6 12.0 2.5 2.6 0.8 1.0 Probable 0.0 0.0 0.0 0.0 0.0 0.0 Total Underground 9.6 12.0 2.5 2.6 0.8 1.0 Surface Open-pit Proved Open-pit 0.8 0.8 3.3 3.3 0.1 0.1 Probable Open-pit 0.0 0.0 0.0 0.0 0.0 0.0 Total Surface 0.8 0.8 3.3 3.3 0.1 0.1 Total Proved 10.4 12.9 2.6 2.6 0.9 1.1 Total Probable 0.0 0.0 0.0 0.0 0.0 0.0 Total Reserve 10.4 12.9 2.6 2.6 0.9 1.1 108 Figure 36: The Kroondal Operations Mineral Reserve Reconciliation at 31 December 2021 109 Table 39: Mineral Reserve per Mining Area as at 31 December 2021 at 100% 4E PGM per Mining Area Proved Probable Dec-21 Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Kwezi 4.8 2.3 0.4 0.0 0.0 0.0 4.8 2.3 0.4 K6 2.2 2.7 0.2 0.0 0.0 0.0 2.2 2.7 0.2 Kopaneng 1.0 2.4 0.1 0.0 0.0 0.0 1.0 2.4 0.1 Simunye 0.3 2.4 0.0 0.0 0.0 0.0 0.3 2.4 0.0 Bambanani 10.8 2.6 0.9 0.0 0.0 0.0 10.8 2.6 0.9 Total Underground 19.1 2.5 1.6 0.0 0.0 0.0 19.1 2.5 1.6 Total: Surface Open-pit 1.7 3.3 0.2 0.0 0.0 0.0 1.7 3.3 0.2 Grand Total (Underground and Surface) 20.8 2.6 1.7 0.0 0.0 0.0 20.8 2.6 1.7 Table 40: Mineral Reserve per Mining Area as at 31 December 2021 at 50% 4E PGM per Mining Area Proved Probable Dec-21 Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Tonnes (Mt) 4E Grade (g/t) 4E PGM (Moz) Kwezi 2.4 2.3 0.2 0.0 0.0 0.0 2.4 2.3 0.2 K6 1.1 2.7 0.1 0.0 0.0 0.0 1.1 2.7 0.1 Kopaneng 0.5 2.4 0.0 0.0 0.0 0.0 0.5 2.4 0.0 Simunye 0.2 2.4 0.0 0.0 0.0 0.0 0.2 2.4 0.0 Bambanani 5.4 2.6 0.5 0.0 0.0 0.0 5.4 2.6 0.5 Total Underground 9.6 2.5 0.8 0.0 0.0 0.0 9.6 2.5 0.8 Total: Surface Open-pit 0.8 3.3 0.1 0.0 0.0 0.0 0.8 3.3 0.1 Grand Total (Underground and Surface) 10.4 2.6 0.9 0.0 0.0 0.0 10.4 2.6 0.9 110 of 142 12.10 Mineral Reserve Sensitivity • No cut-off grade is applied to the Mineral Resources and Mineral Reserves that are quoted due to there being no mining selectivity based on the grade variability being mined at any of the Shafts at the Kroondal Operations. • With the UG2 Reef having low grade variability, all available blocks are reported to be mined, essentially a blanket mining approach. • Long term major changes in prices or input costs can affect shaft sustainability or new project introduction (Section 19). 12.11 QP Statement on the Mineral Reserve Estimation The Mineral Reserves declared are estimated from detailed LoM plans developed per shaft and are based on the Mineral Resource Estimates as at 31 December 2021 together with a set of modifying factors based on recent historical achievements. The assumptions applied in determining the modifying factors are reasonable and appropriate and the LoM plans were developed with a bottom-up approach that is sufficient in detail to ensure achievability. All the inputs used in the estimation of the Mineral Reserves have been thoroughly reviewed and can be considered technically robust. The QP considers the modifying factors to be based on a robust historical database of several years history and no material changes are anticipated that will have a significant bearing on the estimation process. Risks are further discussed in Section 21. 13 Mining Methods 13.1 Introduction This section includes discussion and comments on the mining engineering related aspects of the LoM plan associated with Kroondal Operations. Specifically, the comment is given on the mine planning process, mining methods, geotechnics, geohydrology and mine ventilation. Kroondal Operations are divided into five separate mining shafts: • Kwezi • K6 • Kopaneng • Simunye • Bambanani The mine layout is presented in Figure 37.
111 Figure 37: Mine Layout (Bord and Pillar) 13.2 Shaft Infrastructure, Hoisting and Mining Method 13.2.1 Shaft Infrastructure Kroondal Operations consist of large, established shallow level mechanised PGM mines in the Bushveld Complex accessed from the surface utilizing decline systems. Kroondal Operations comprise five shafts that have the same decline systems and mining method i.e. bord and pillar. Figure 38 shows the Townlands Section (Kwezi and K6 Shafts) infrastructure and Figure 39 shows longitudinal sections of the Western Kroondal Operations mining units (Kopaneng, Simunye and Bambanani). 112 113 of 142 Figure 38: Townlands Section Infrastructure 114 Figure 39: Kroondal Section Infrastructure
115 of 142 13.2.2 Hoisting All underground mining operations are accessed via decline ramp systems. The hoisting capacities are presented in Table 41. Blasted material is transported to the tipping places underground with low profile Load Haul Dump (LHD) machines). At the tips, broken material is screened at grated grizzlies. From the grizzlies, the material is automatically loaded onto an intricate system of conveyor belts. Material is moved from underground via conveyor belt systems to surface storage silos before being transported again via the conveyor belt system to the processing plants. Table 41: Hoisting Capacities of the Kroondal Shafts Shaft Operating Capacity (ktpm) 5-year Planned production (ktpm) Kwezi 150 145 K6 140 125 Kopaneng 186 144 Simunye 160 141 Bambanani 130 120 13.2.3 Mining Methods The mining method applied at all Kroondal Operations shafts is mechanised bord and pillar. There are, however, a few sections where handheld drill and blast operations take place. No backfilling is used on underground operations. There is no requirement for stripping in the open-pit operations. 13.3 Geotechnical Analysis The TRS has been compiled with generally appropriate input from qualified rock engineers. Strategic planning and major design issues were completed with the relevant input from the responsible rock engineers. The primary aspects making up the geotechnical analysis are; • Geotechnical conditions • Stress and seismological setting • Regional and local support 13.3.1 Geotechnical Conditions Major structures/fault zones intersect the orebody at most operations. Structures of note are; • Dykes – A number of dykes affect these operations, especially Bambanani Shaft. Appropriate mitigation strategies are in place and these include bracket pillars, secondary and tertiary support as well as limiting mining to necessary development only. • Siphumelele/Turfontein Shear zone – affects Bambanani Shaft. Ground conditions characterised by blocky rockmass. Mitigation strategies include secondary support and reduced panel spans. 116 13.3.2 Stress and seismological setting Stress and seismicity risk is low at these operations as they are generally shallow mining operations. 13.3.3 Regional and local support In the bord and pillar operations, regularly spaced intact pillars are left as part of the layout. These pillars support the middling to the surface and should not be allowed to yield or fail. The protection of surface structures, i.e. buildings, roads, railway lines, etc., is achieved by ensuring that the pillars, in the stoping environment are capable of supporting the overburden. These pillars have Factor of Safety (FoS) >2,0 This empirically derived FoS is a requirement of the MCOP. 13.4 Mine Ventilation All projects and new infrastructure designs incorporate detailed ventilation modelling and recommendations as part of normal feasibility planning processes under the auspices Environmental Engineering. All underground mines are demarcated into mining ventilation districts. The ventilation design is based on the velocity of 0.7 m/s for mechanized mining. 13.5 Flammable Gas Management Sporadic flammable gas intersections are encountered on the shafts. These intersections are well controlled by the Flammable Gas Code of Practice and procedure. Continuous gas measuring instruments and a telemetry system are used to detect Carbon Monoxide in the operations. 13.6 Mine Equipment The following major mine equipment (Table 42) is installed and utilised at the Kroondal Mechanized Operations: Table 42: Major Equipment Quantity Summary Major Equipment Quantities Chairlifts 20 Conveyors 237 Mini-Subs 277 Substations 21 Vent Fans 26 117 Summary of mobile equipment (Table 43)utilized at the Kroondal Operations: Table 43: Mobile Equipment Summary - 2021 Asset Type Jan-21 Ambulance 6 Forklift 1 Grader 7 LDV 110 LHD 239 Manitou 5 Roof-bolter 90 Drill Rig 78 Jeeps 49 UVS 109 UPC 38 The following major process equipment (Table 44) is installed and utilised at the Kroondal Minopex Concentrators: Table 44: Major Process Equipment 13.7 Personnel Requirements Refer to section 4.5 for personnel requirements. 13.8 Final Layout Map Refer to Section 12.7 and Figure 35 for the distribution of Mineral Reserve and mined-out areas. 14 Processing and Recovery This section covers the metallurgical and mineral processing aspects associated with Kroondal Operations. The process metallurgy and process engineering aspects relating to plant capacity, metallurgical performance and metal accounting practices are incorporated in the LoM plan. Sibanye-Stillwater owns and operates two processing plants at the Kroondal Operations which are Kroondal 1 Concentrator Plant (K1 Plant) and Kroondal 2 Concentrator Plant (K2 Plant) whilst Marikana processing plant is under care and maintenance. Major equipment Quantity Ball mills 5 Cone crusher 3 Flotation cells 77 Jaw crusher 2 Thickeners 4 118 The mineral processing facilities at the Kroondal Operations are located at two sites. Both mineral processing plants are operated and maintained under contract by Minopex. The K1 Plant was commissioned in October 1999 and the K2 Plant was commissioned in April 2005. A summary of the main components for the operations is provided below. 14.1 Processing Facilities Kroondal Operations incorporate the Kroondal 1 Concentrator Plant situated next to Kopaneng Shaft and the Kroondal 2 Concentrator Plant, situated about 2km East of K1 Concentrating Plant close to Simunye and Bambanani shaft. Both K1 and K2 Plants have associated Chrome Spiral Plants (Namely K1.5 and K2.5) situated next to the respective plants. Presently, the K1 and K2 processing plants process 310 and 325 ktpm of ore, respectively. In addition to the PGM plants, the Kroondal Operations also include: • Chrome Tailings Retreatment Plant (CTRP) and Marikana concentrator are currently under care and maintenance • The three Tailings Storage Facilities (TSFs), namely the K1, K150 and K2 TSF • The two Dense Media Separation (DMS) waste stockpiles (K1 DMS Stockpile and K2 DMS Stockpile) Current mineral processing plant parameters for the Kroondal Operations are shown in Table 45. Capacities are based on historical and current performance. Table 45: Mineral Processing Plant Parameters Plant Design Capacity (ktpm) Operational Capacity* Average 4E Recovery Factor (%) Material Treated Average Forecast Tons /Month(2022 Plan) K1 290 290 81.7 UG2 265 021 K2 300 300 80.0 UG2 263 419 Kroondal has access to all material requirements. 14.1.1 K1 Plant Mining started in March 1999 via two decline shafts (originally the Central and East shafts, now Kopaneng and Simunye) and by year-end, full production had been achieved and the initial plant commissioned. The original plant design made provision for the establishment of one mineral processing plant located to the south of the open-pit, now referred to as the K1 Plant (Figure 42). The original production capacity of the plant was 100 kilotonnes per month (ktpm). This capacity was increased to 290 ktpm as part of the Phase 1 Expansion project. The Expansion Project that took place included the addition of the Secondary Ball Mill and Flotation circuit as well as Flash Float Cells at the DMS circuit. The original Primary Rod Mills were also converted to Ball Mills. The QP considers the K1 Plant to be in good condition both mechanically and structurally and, subject to adequate ongoing maintenance, should meet the LoM requirements.
119 14.1.1.1 Production Plan The recent history and budget operational parameters for the K1 concentrator are presented in Table 46, Figure 40 and Figure 41. The C2018, C2019, 2020 and C2021 data presented reflect the actual annual performance whilst the C2022 to C2040 data represents current budget targets. The current operational methods and capacities are adequate. Metallurgical efficiencies projected have also been sustainably obtained historically and are thus reasonable budget targets. Table 46: K1 Concentrator Production Forecast and Operational Data Figure 40: K1 Concentrator Throughput Forecast Parameter Actual Budget C2018 C2019 C2020 C2021 C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 Total Feed (kt) 3 892 4 024 2 875 3 532 3 180 2 681 2 541 2 159 1 557 1 163 490 186 Head Grade (g/t) 2.44 2.36 2.38 2.39 2.45 2.48 2.56 2.53 2.48 2.48 2.51 2.60 Concentrate Produced (kt) 29 30 24 28 27 23 21 18 13 10 4 2 4E Recovery (%) 83% 82% 83% 88% 83% 83% 83% 83% 83% 83% 83% 83% 4E Metal Produced (koz) 253 251 182 225 208 177 173 146 103 77 33 13 120 Figure 41: K1 Concentrator Production and Recovery Forecast 121 of 142 Figure 42: The Schematic Process Flow Diagram for K1 Processing Plant 122 14.1.1.2 Crushing K1 Plant treats ROM ore from Kopaneng, Simunye and K6 shafts. ROM ore is transported by truck or conveyor to the primary crusher, where it is crushed and screened before being passed through a secondary crusher. The correctly sized material is then conveyed to the DMS feed silos. As part of the Phase 1 expansion project, the capacity of the crushing plant was increased to 142 000 – 300 000tpm. A grizzly feeder is used to remove most of the fines before the ROM ore is sent to the Primary Crusher to better utilize the crusher. An intermediate silo with a capacity of 800t was developed between the primary and secondary crushing sections. Furthermore, the operating time of the crushing plant was increased to 7 days from the original design capacity of 6 days a week. 14.1.1.3 Dense Media Separation (DMS) Plant To minimize the treatment of waste rock and to upgrade the ore head grade, a DMS plant is located between the crusher section and the milling section of each plant. The DMS plant is fed from the DMS feed silos, which are two concrete units with a total storage capacity of approximately 8000t and 2500t, respectively. The additional DMS feed silo was built at a later stage and served as a reserve silo. An automated hammer sample cutter takes samples every few minutes to determine the feed head grade of the ore coming into the DMS circuit. The Phase 1 expansion to the DMS plant involved upgrading the DMS section with larger cyclones to treat the higher feed tonnage. The DMS process treats coarse material (minus 30 mm plus 2 mm), whilst the fines (minus 2mm) bypass this process and are ‘flash-floated’ immediately after being screened ahead of the DMS section. A short residence-time flotation unit recovers the bulk of the PGM-bearing material from the fines before reporting to the primary milling-flotation circuit. During the Phase 1 expansion, additional flash-float units were also installed to treat the additional fines coming from the feed and to increase the residence time to increase grade and recovery. The DMS waste is passed onto a waste conveyor which transports the material to a DMS waste rock stockpile, situated to the east of the plant. The DMS product is then conveyed to the north feed bin. Regular interval samples are taken with an automated sample cutter to minimize the loss of PGMs contained within the waste rocks to the waste rock stockpile. The DMS plant produces a maximum of 1 200 000 tpa of waste rock. 14.1.1.4 Milling The primary milling-flotation circuit treats DMS ‘sinks’ material (together with the flash float fines), which is essentially the ‘reef’ proportion of the coarse run-of-mine ore. Two primary mills are installed at the plant. The two circuits are identical and are described below. In order to maximize recovery of the PGM, the material must be ground. The PGM bearing material is fed into the front of the mill and is broken into smaller particles. Water is also fed into the mill and the material exists as a dense slurry and is then diluted. The slurry passes over vibrating screens to remove any waste and scats and is then pumped to the flotation section. The Phase 1 expansion project made provision for the inclusion of a regrind ball mill circuit. The ball mill operates in an open-circuit so as to minimize losses. The cleaner flotation tailings are re-introduced to the ball mill circuit which effectively ‘closes’ the primary cleaner flotation circuit, and improves recovery
123 and reduces the likelihood of operational losses from the concentrator. The regrind flotation cell arrangement is similar to the primary rougher flotation circuit, resulting in parallel flotation trains. 14.1.1.5 Flotation (Addition of Reagents) The floatation process is used to concentrate the PGMs. In the flotation process, the minerals of the PGM attach to bubbles of air and are thus separated from the slurry of milled ore. The concentrate collected on the bubbles is upgraded through a series of flotation steps. Reagents for the flotation process are added to the slurry from the mill. These reagents are: • Sodium isobutyl xanthate (SIBX) links up with sulphide minerals, these minerals are naturally hydrophobic and the SIBX enhances this • Poly-propylene-glycol (frother) which stabilises the bubbles • Carboxy-methyl-cellulose (CMC depressant) stops fine silica and slimes attaching to the bubbles and makes talc and gangue material in the solution fuse together. Kroondal 1 operates an MF2 circuit, whereby the product of the primary mill feeds the primary rougher circuit with the tails from the primary roughers feeding the secondary mill. The secondary mill product feeds the secondary roughers. The primary roughers produce high grade and medium grade concentrate, the high-grade concentrate reports to the primary cleaner bank 1. The primary medium grade concentrate reports to the secondary cleaner bank 1. The secondary roughers produce high and medium grade concentrate. The high-grade concentrate from the secondary roughers reports to primary cleaner bank 1 and the medium grade concentrate from the secondary roughers reports to the secondary cleaner bank 1. The primary cleaner circuit comprise of 4 banks of primary cleaners. The primary cleaner circuit like the secondary is an upgrading floatation circuit with concentrate from bank 1 upgraded in bank 2, bank 2 concentrate upgraded in bank 3 and bank 3 concentrate upgraded in bank 4 which is the final concentrate. Secondary cleaner section is similar to primary cleaners section. The final concentrate is pumped to the concentrate thickener for thickening and dispatch via slurry trucks. The tails from the secondary rougher flotation cells pass to the chromite removal section. 14.1.1.6 Chrome Removal Associated with the processing plant is the Chrome Spiral Plant. The secondary rougher flotation tailings pass through the spiral plant to recover chromite from the milled product. The chrome recovery circuit of the K1 plant was upgraded to contain additional spiral concentrator units to increase the chromite concentrate yield. On average, the K1 Spiral Plant produces 26 000 tonnes of chrome per month with a Cr2O3 grade of above 40.5%. 14.1.1.7 Reagent Make-Up and Distribution The chemicals used in the flotation process are delivered as either concentrated solutions or dry. Except for the frother, these chemicals must be made up, hydrated or diluted prior to use in the flotation plant. Although the exact make-up system varies for each chemical, basically, each reagent is added to a tank, to which water is added and then the resultant solution is mixed and circulated and then pumped into the flotation plant. 124 14.1.1.8 Tailings Separation Slurry from the secondary rougher flotation step is discarded as tailings, after the Chrome is removed by the Spirals. The tailings are thickened in thickeners and then discharged to one of the tailings storage facilities, namely K1 Tailings dam and K150 Tailings dam. 14.1.2 Kroondal No.2 Plant K2 Plant (Figure 43 and Figure 46) was built and commissioned in 2005. At that stage, there were three operational shafts with the construction of a fourth shaft (Kwezi) to start in the following year. In 2008 the production ramp-up began at Kwezi and continued into the following year with a total of four decline shafts in production. The QP considers the K2 Plant to be in good condition both mechanically and structurally and subject to adequate ongoing maintenance should meet the LoM requirements. Figure 43: Aerial View for the K2 Plant 14.1.2.1 Production Plan The recent history and budget operational parameters for the K2 concentrator are presented in Table 46, Figure 405 and Figure 416. The C2018, C2019, 2020 and C2021 data presented reflect the actual annual performance whilst the C2022 to C2040 data represents current budget targets. The current operational methods and capacities are adequate. Metallurgical efficiencies projected have also been sustainably obtained historically and are thus reasonable budget targets. 125 Table 47: K2 Concentrator Production Forecast and Operational Data Parameter Actual Budget C2018 C2019 C2020 C2021 C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 Total Feed (kt) 3 838 4 095 3 119 3 518 3 161 2 903 2 973 3 215 3 106 2 684 1 294 1 270 Head Grade (g/t) 2.54 2.58 2.53 2.42 2.5 2.55 2.66 2.5 2.48 2.51 2.57 2.6 Concentrate Produced (kt) 40 40 32 37 33 31 31 34 32 28 13 13 4E Recovery (%) 82% 82% 83% 83.30% 79% 79% 81% 83% 83% 83% 84% 84% 4E Metal Produced (koz) 257 278 211 228 201 188 206 214 206 180 89 89 Parameter Budget C2030 C2031 C2032 C2033 C2034 C2035 C2036 C2037 C2038 C2039 C2040 Total Feed (kt) 1 258 1 246 1 271 1 236 1 137 921 913 885 672 499 363 Head Grade (g/t) 2.63 2.61 2.69 2.64 2.7 2.69 2.68 2.64 2.6 2.63 2.62 Concentrate Produced (kt) 13 13 13 13 12 10 10 9 7 5 4 4E Recovery (%) 84% 84% 84% 84% 84% 84% 84% 84% 84% 84% 84% 4E Metal Produced (koz) 89 888 92 88 83 67 66 63 47 35 26 126 Figure 44: K2 Concentrator Throughput Forecast Figure 45: K2 Concentrator Production and Recovery Forecast.
127 Figure 46: The Schematic Process Flow Diagram for Kroondal No.2 Plant 14.1.2.2 Crushing The K2 Plant treats ROM ore from the Simunye, Kwezi and Bambanani shafts, respectively and recently open-pit ore from Klipfontein. The ROM ore is transported via train, truck or conveyor to an elevated ROM silo. From this silo, it is crushed down to minus 20 mm by a two-stage crushing circuit. The primary crushing consists of a Grizzly Feeder feeding the Jaw Crusher, which crushes the ROM ore down to 75 mm. This ore is then transported via an overland conveyor to the secondary crushing. The secondary crushing consists of a vibrating screen that removes the minus 30 mm particles. The oversize is sent to a small bin with a vibrating feeder which feeds the secondary cone crusher which has a closed side setting of 19-22 mm. The Cone Crusher product will then go back to the vibrating screen. The secondary crushing is thus operating in a closed loop. The undersize of the vibrating screen is then sent to a 4000t fine ore silo, also known as the DMS feed silo. 128 14.1.2.3 Dense Media Separation (DMS) Plant The operation of the DMS at the K2 Plant is very similar to the DMS of the K1 Plant. Both are used to upgrade the feed ore head grade and to minimise treatment of waste rock. Minor differences exist in the plant itself, such as original equipment manufacturer (OEM) designs of certain equipment and sizes due to the K2 Plant being able to feed 325 ktpm to the DMS. Regular automated samples of the DMS feed as well as the DMS floats (waste rock) are taken for metal accounting purposes, the same as at K1. K2 also has its own waste rock stockpile situated next to the plant, where waste rock is transported by conveyor belts to the stockpile. Around 3.7 Mt per annum of waste rock is produced by K2 Plant. The sinks (product rock) from the DMS, together with the particles that are smaller than 2 mm (the feed prep screen underflow) is sent with a conveyor to the concrete mill feed silo which has a capacity of 3500t. 14.1.2.4 Milling The primary milling phase is carried out in a single primary ball mill similar in design to the mills at the K1 Plant, but larger in capacity. Grinding balls (70mm diameter for primary mill and 40mm diameter for secondary mill) are used to grind the material down. The K2 Plant also follows a mill-float-mill float (MF2) processing circuit, meaning that the discharge of the primary mills will be fed to the primary roughers. The tails of the primary roughers are then sent to the secondary ball mill to be re-grinded. The discharge of the secondary ball mill is then sent to the secondary floatation to be floated again. 14.1.2.5 Flotation (Addition of Reagents) The floatation process of the K2 Plant has the same purpose as that of the K1 Plant, which is to concentrate the PGMs, but with a different flow in the process. The difference between the floatation circuit of the K1 and K2 Plants is that the K2 Plant has additional fast cleaners in the primary as well as the secondary circuit. The concentrate of these fast cleaners is considered by the QP to be of a grade high enough to go directly to the final concentrate. Reagents for the flotation process at the K2 Plant are the same as the K1 Plant, except for the additional copper sulphide. These reagents are: • SIBX, which links up with sulphide minerals, these minerals are naturally hydrophobic and the SIBX enhances this • Poly-propylene-glycol (frother) which stabilises the bubbles • CMC depressant which stops fine silica and slimes attaching to the bubbles and makes talc and gangue material in the solution fuse together • Copper sulphide (activator) acts as a promoter for the PGM’s to be floated. 129 • K2 basically has four product streams which will all go to the final concentrate. These four streams are: • Flash float concentrate from the DMS section • Fast cleaner concentrate from the primary floatation circuit • Secondary re-re-cleaner concentrate • Primary re-cleaner concentrate. All of the above mentioned is blended to deliver a final concentrate of around 180 g/t PGM’s. The secondary rougher tails are also pumped to the spiral section for the chrome removal. Kroondal 2 operates a MF2 circuit, whereby the product of the primary mill feeds the primary rougher circuit with the tails from the primary roughers feeding the secondary mill. The secondary mill product feeds the secondary roughers. The primary roughers produce high grade and medium grade concentrate, the high- grade concentrate reports to the fast cleaners. The primary medium grade concentrate reports to the secondary cleaners. The secondary roughers produce medium and low grade concentrate. The medium grade concentrate from the secondary roughers reports to primary cleaners and the low-grade concentrate from the secondary roughers reports to the secondary cleaners. The primary cleaner circuit comprise of fast cleaners, primary cleaners and primary re-cleaners. The concentrate from the fast and primary – re cleaners is the final concentrate and it is pumped to the concentrate thickener for dispatch. The secondary cleaner circuit is made up of the secondary cleaners, secondar re- cleaners and secondary re-re-cleaners. The concentrate from the secondary re-re- cleaners is the final concentrate from this circuit and is pumped to the concentrate thickener for dispatch. The tails from the secondary rougher flotation cells pass to the chromite removal section. 14.1.2.6 Chrome Removal Like the K1 plant, the K2 Plant also has an associated Chrome Spiral Plant. The secondary rougher flotation tailings pass through the spiral plant to recover chromite from the milled product. A total of approximately 41 000t of chromite concentrate is produced per month from both plants. 14.2 Future Projects As part of the proposed West-West Open-Pit Rehabilitation and Surface Tailings Storage Facility Project for the Marikana assets at the Kroondal Operations, modifications will be required for the Kroondal Mine Processing Plants to recover residual platinum in the current tailings. These modifications are necessary to ensure that further residual platinum, PGMs and chrome from the tailings are extracted, and that no viable resources are deposited in the tailings during the rehabilitation of the West-West Open-Pit. 130 The profit-sharing agreement (PSA) agreement with Anglo American Platinum for the Kroondal mine is set to expire during the course of 2022-2024. This development means that Kroondal concentrates needs to produce concentrate with chrome content of below 1.5%. A project, although in its conceptualisation stage, is underway to investigate the feasibility of installing additional floatation cells which will help in cleaning the concentrate to reduce chrome content in the final concentrate for the Kroondal Operations. A feasibility study is planned to be undertake by Kroondal Operations and a third party to determine the economic and metallurgical viability of re-treating Kroondal floats discards. The proposal is still on pre-planning stage and awaiting approval from the executives. 14.3 Sampling, Analysis, PGM Accounting and Security Generally, adequate attention is given to sampling and sample preparation. Samples are prepared in the on-site labs at both the K1 and K2 Plants whereafter it will go to external laboratories for PGM and Chrome analysis. A final analysis is conducted at the Waterfall smelter on the concentrate to complete the metal accounting. Whilst there are minor accounting anomalies, good accounting procedures are largely in place. Plant feed tonnage is generally measured via weightometer scales after the Primary Crushing section, before the Secondary Cone Crusher as well as on the DMS Feed Conveyor and mill feed belts. The waste (floats) and product (sinks) material are also measured on the separate conveyor belts. Plant feed and the waste are sampled on the DMS Feed conveyor and DMS floats conveyor, respectively, with a hammer sampler. Primary rougher feed, secondary rougher tails, flash float concentrate, primary and secondary cleaner concentrate and final concentrate before despatch samples are almost exclusively taken automatically, with cross-stream pulp cutters, although hand cut samples are taken in certain cases. Shift composites are accumulated and prepared as per the defined standard operating procedure. There are no real security issues, as the final product is a concentrate which is transported in bulk and requires further processing at the smelter and refinery. 14.4 Plant Lock-up The quantity of clean-up PGMs that can be anticipated on the closure of a concentrator or processing plant is uncertain. Final Product The final product of the K1 and K2 Plants is PGM concentrate in a slurry form. Waterfall smelter, with whom there is a pooling and sharing agreement, takes this slurry concentrate and smelts it to purify it even further before sending it to the refineries.
131 14.5 Energy South African power utility Eskom supplies energy to Kroondal Operations. Grinding mills are the highest consumer of power at Kroondal. The maximum rating for Kroondal 2 mills is 10.4kW made up of 2 mills of equal rating. The maximum rating for Kroondal 1 mills is 7.6kW, this is made up of 2 mills rated 1.2kW and 1 mill rated 5.2kW. Kroondal 2 uses about 6 569 837.7kWh/month on month on average and Kroondal 1 uses about 4 700 897.7kWh/month on average. 14.6 Water Kroondal Operations receives water from Kroondal return water dams which are K150, K1, K2 and Marikana return water dams. The slurry from the plants in the form of tailings discards is pumped to Kroondal TSF’s(Marikana, K1, K150, K2), these TSF’s retain solids and through the penstock returns water to Kroondal return water dams. The major source of water for the Kroondal Operations is rain water which is collected via the TSF’s , return water dams ,Marikana pits and storm water dams. The water from the return water dams is pumped to both Kroondal plants process water dams for use in the plants. Rand Water Board supplies water to Kroondal Operations for domestic use. 14.7 Personnel The complement at Kroondal is 249 permanent employees, with Kroondal 2 accounting for 128 and Kroondal 1 121. The management team is made up of an area manager who is looking after the two plants, a plant manager, plant engineer and a process superintended for each plant. Middle management is made up of materials controller, mechanical foreman, Instrumentation foreman, electrical foreman, lab supervisor and 4 shift supervisors. The operation runs 24 hours with 3 shifts on rotation. 14.8 QP Opinion on Processing The QP is satisfied that the Mineral Processing is appropriate and sufficient to support the LoM and that all material issues have been addressed in this document. 15 Infrastructure 15.1 Overview of Infrastructure Engineering infrastructure at the Kroondal Operations includes a wide range of operating technology, which varies in age and extent of mechanisation. Figure 47 shows the layout of the mine and the placement of shafts and other surface infrastructure within the mine boundaries. The infrastructure includes a wide range of underground Trackless Mobile Machinery (TMM) as well as the necessary underground infrastructure to support underground mechanised mining. Surface infrastructure include processing plants, Tailing Storage Facilities as well as 132 Electricity, Water and Road infrastructure. Shared services infrastructure not on the mine is not shown. Underground operations comprise of five Decline shafts (3 Barrel systems) and infrastructure to convey personnel, materials and equipment to and from the working areas and associated services to support mining operations. Main Decline infrastructure includes Trunk (Main/Dip/Decline) conveyor systems with underground storage facilities (Bunkers), main roadways (for mobile machinery - TMM) and Chairlift infrastructure for the conveyance of people. The main infrastructure further includes permanent water and compressed air columns and Medium Voltage (MV) electrical reticulation. Main ventilation shafts and associated ventilation fans as well as permanent dams for water management form part of the main infrastructure. Surface infrastructure at the decline shafts includes TMM workshops, compressors, water supply and settler systems, and MV substations all in support of the underground operation. Other surface infrastructure includes primary ventilation, process facilities, office blocks and training centres, workshops and stores, lamp rooms, and change houses. There are also several services and supply centres. These include compressed air supply stations and minor workshops for small repairs to plant and equipment. Further surface infrastructure includes two Processing plants (K1 and K2 Plants), various Tailings Storage Facilities (TSF) and associated return water dams and waste rock dumps associated with the dense media separation in both processing plants. Office infrastructure, roads, Rand Water supply points, Eskom 88 kV overhead supply lines and surface water and electrical reticulation complete the surface infrastructure. Notwithstanding the age of the general infrastructure, all surface and underground infrastructure is reasonably maintained and equipped. In conjunction with the planned maintenance programmes, including specific remedial actions, structural audits and condition monitoring programmes, the QP considers the current infrastructure, hoisting capacities and logistical capacities more than adequate to satisfy the requirements of the LoM plan. Further, the power supply and distribution systems, water sourcing and reticulation systems are appropriate as envisaged in the LoM plan. 133 Figure 47: The Layout of the Kroondal Operations 15.2 Tailings Storage Facilities The Kroondal Operations have four TSFs (Figure 48), namely: • K1 TSF which receives tailings from the K1 Plant and K2 Plant in emergencies • K150 TSF which receives tailings from the K1 Plant • K2 TSF which receives tailings from the K1 Plant • Marikana TSF which has recently been used again by the K2 Plant. Plant residue is disposed on four TSFs located close to the K1 and K2 plants with the following properties: • K1 TSF with a design capacity of 28,000tpa. • K2 TSF with a design capacity of 86,000tpa. • K150 dam, an extension next to K2 with a design capacity of 86 000tpa. • Marikana TSF with a design capacity of 200 000tpa. 134 Tailings are transported and deposited by means of multi-stage pumping and tailings disposal lines discharging into spigots at the TSF, with decant water being returned to the process water circuit. K1 and K2 are raised using spigot systems. K150 is raised using cyclones. Figure 48: Location of Kroondal Operations Tailings Storage Facilities 15.2.1 K1 TSF This is the first TSF that was used at the Kroondal Operations in 1999. Currently, it is almost at its full capacity. A maximum of 28 000t of tailings can be pumped to the K1 TSF per month. Return water from this TSF is pumped back to the K1 Plant. The K1 TSF was used as an emergency deposition facility for the K2 Plant. 15.2.2 K150 TSF K150 TSF is being used by the K1 Plant. Return water can also be transferred back to either the K1 Plant process water dam or the K2 Plant process water dam. Normally most of the water is pumped back to the K1 Plant as K150 is the Plants’
135 main source of water. K150 elevated Penstock project will be completed in Q3 2022 15.2.3 K2 TSF The K2 TSF is used by the K1 Plant. 15.2.4 Marikana TSF The Marikana TSF was used during the time that Marikana Concentrator Plant was still operational. It has been utilised again by K2 Plant (2019) to pump its tailings. A booster pump station (BPS) is situated between the K2 Plant and Marikana TSF due to the distance between the K2 Plant and the TSF. Dam stability Buttress is ongoing. Phase 3 will be completed in end April 2022 and Phase 4 at end December 2022. 15.2.5 LoM Requirements There is adequate storage capacity for the tailings resulting from ore processing at the K1 processing facility (Table 48) for the LoM Plan till 2025, and the Tailings Storage Facilities are in good condition. Tailings from the K2 processing facility in excess of the capacity of the Marikana TSF is to be deposited on the planned Marikana Pit TSF. Future Opportunities to increase capacity • Utilize Marikana Open-Pit (disused pit) for tailings deposition • Improved water reticulation strategy to be developed Table 48: LoM Assessment of Tailings Facilities Tailings Facility LoM Deposition (Mt) Available Capacity (Mt) Surplus / (Shortfall) (%) K1 1.3 1.3 0 K150 3.9 3.9 0 K2 3.9 5.0 28.2% Marikana** 30.6 18.6 -39.2% Total 39.7 28.8 **Additional capacity is possible if additional buttressing is approved for extension of the dam elevation an additional 10 metres. 15.3 Power Supply Power supply at Kroondal Operation is obtained from two separate Eskom supply points into the K1 and K2 Plants, respectively, via two separate 88 kV overhead lines from the Eskom grid (Figure 49 and Figure 50). The power distribution to the three shafts at Kroondal as well the plants and surface infrastructure is done by means of 136 11 kV Over-Head conductors. The other two shafts at the Kroondal operation are supplied via the Anglo MV network and the Rustenburg Local Municipality (RLM). Kroondal has a total of 80 MV-installed capacity (two off 20 MVA at each point of supply) and a combined Notified Maximum Demand (“NMD”) of around 60 MVA. Figure 49 shows the layouts for power points and surface infrastructure for Kroondal Operations. Figure 49: Schematic Layout of Power Points of Supply and Surface Infrastructure 137 Figure 50: Eskom Electricity Supply 15.4 Bulk Water, Fissure Water and Pumping See Section 17.5.6 for more information on Bulk Water, Fissure Water and Pumping. No pipeline infrastructure components are material to the Kroondal Operations. At each of the underground operations, there are local and main pumps installed for dewatering purposes. There are a number of underground dams available at the mines: • Kopaneng 7 • Simunye 10 • Bambanani 19 • Kwezi 8 • K6 4 Monthly pumping rates at the shafts are: • Kopaneng 63,528 m3/month • Simunye 53,616 m3/month • Bambanani 54,217 m3/month • Kwezi 41,936 m3/month • K6 45,198 m3/month 138 Monthly Process Water sent underground was declared per shaft as follows in December 2016: • Kopaneng 47,404 m3/month • Simunye 36,180 m3/month • Bambanani 47,404 m3/month • Kwezi 41,936 m3/month • K6 29,155 m3/month Monthly freshwater used for top-up from Rand Water Board was declared per shaft as follows in December 2016: • Kopaneng 9,504 m3/month • Simunye 6,570 m3/month • Bambanani 4,301 m3/month • Kwezi 7,678 m3/month • K6 4,315 m3/month The risk that run-off from surrounding areas would enter the mine via the surface portals is well managed by measures to divert run-off away from the portals. Fresh and processed water sent underground could be stopped immediately if circumstances threatened underground flooding, limiting the ingress of water to groundwater, i.e., from fissures. Fissure water ingress varies considerably by the shaft. ‘Other water’ entering the system is as little as 5% of the total volume pumped to the surface at Kopaneng and Bambanani shafts, but as much as 35% at the K6 decline shaft, with the Kwezi decline shaft at 20% and the Simunye decline shaft at 25%. Since the area is already extensively mined, there is little likelihood of intersecting a significant underground lake. Under normal circumstances, therefore, considering the installed pump capacity and the rate of fissure water ingress, accidental flooding at these operations is unlikely. 15.5 Roads and Transport Infrastructure The road network on the Kroondal Operations site consists of paved and unpaved roads, which are primarily used for the transport of personnel and for access to the offices, shafts, plants and infrastructure positioned around the mine site. Rail and port infrastructure are not material. as the product is transported by road to the smelter and refineries and by road or commercial airlines to the end consumer.
139 15.6 Equipment Maintenance 15.6.1 Surface Workshops Surface workshops for major repairs were converted to off-site repair facilities operated by third party suppliers in the neighbouring towns. Only minor repairs are done on the decline shafts. 15.6.2 Underground Workshops Underground workshops are used for routine maintenance of equipment. All areas are well equipped. Facility configuration depends on the equipment that is being serviced to ensure compliance as per the requirements of the planned maintenance schedules. Workshop areas are well ventilated and illuminated, and floor areas are concreted. 15.7 Offices, Housing, Training Facilities, Health Services Etc. The Kroondal Operations have central offices at various mines for shared services and offices at the shafts and plant for mine services(Figure 39). Kroondal Operations are near to several towns and cities at which some of the mine personnel live. The mine also provides mine housing and hostels for some of its personnel. Transportation from high population density areas serving the mine is operated by a third-party supplier. Otherwise, all transportation is public services or personal vehicles. Training facilities are provided through the Sibanye Platinum Academy and central training near the Kroondal Operations (see adjacent properties Section 20). Primary Health services are centralised at Operations shared by the Sibanye Platinum Operations. 15.8 QP Opinion on Infrastructure The Qualified Person is satisfied that the infrastructure is appropriate and sufficient to support the LoM and that all material issues have been addressed in this document. There are no other infrastructure components that are material to the. Rustenburg operations. 16 Market Studies 16.1 Concentrates and Refined Products Concentrate is sold to Anglo American Platinum under a toll agreement where the downstream smelting and refining is carried out by AAP Rustenburg. 16.2 Metals and Marketing Agreements AAP is responsible for the sale and marketing of the final product. 140 16.3 Markets and Sales 16.3.1 Introduction Information on PGM, including gold, markets is widely available in the public domain. Major refiner and manufacturer of products using PGM, Johnson Matthey regularly publishes market reports. In addition, Sibanye-Stillwater has commissioned an independent PGM market study from SFA (Oxford). This information, along with negotiated contracts, informs Sibanye-Stillwater’s price and sales predictions. Below is an extract on Supply and demand from the SFA market study, March 2022. The usefulness of PGMs is determined by their particular chemical and physical properties. Certain of these properties are shared by other materials, but it is the unique combination of properties that makes the PGMs so valuable in their end- markets. The PGMs have high and specific catalytic activity, high thermal resistance, are chemically inert, biocompatible and are hard but malleable for forming into shapes. All the PGMs are constantly subject to risks of substitution from cheaper alternatives, but in most applications their unique properties render them relatively secure. The high cost of PGMs inevitably drives efforts to use lower quantities through thrifting, thereby reducing the loadings in applications. 16.3.2 Demand Summary The main uses of platinum are as a catalyst for automotive emissions control, in a wide range of jewellery pieces and in industrial catalytic and fabrication applications. Palladium is primarily used as a catalyst in the automotive sector, mainly in gasoline-powered on-road vehicles, but alongside platinum in parts of the light-duty diesel engine after-treatment too. The second main use of palladium is in electrical components, specifically in multi-layer ceramic capacitors (MLCCs), as conductive pastes and in electrical plating. Rhodium is used almost solely in the automotive sector, with a small amount used in the glass, chemical and electrical industries. Table 49: PGM Demand 2021 Platinum Demand Palladium Demand Rhodium Demand • Autocatalysts (primarily for diesel engines • Wide range of jewellery • Many industrial uses • Autocatalysts (primarily for gasoline engines • Electrical components • Many chemical applications • Autocatalysts • Chemical catalysts • Glass fabrication • Electrical components 141 Platinum Demand Palladium Demand Rhodium Demand Source: SFA (Oxford). Note: Excludes physical investment products. All statistics and their analyses are accurate as of March 2022. 16.3.3 Supply Summary The majority of PGM resources are located in Southern Africa, which accounts for over 80% of global PGM resources. Russian PGM supply, with the exception of PGMs produced in the Kondyor, Koryak and Urals regions, is mostly generated as a by-product of nickel mining (from Nornickel) and is the world’s largest source of palladium. Russia is also the second- largest producer of platinum and rhodium, accounting for approximately 25% of the world’s total PGM supply in 2021. Other key platinum mining regions include Zimbabwe’s Great Dyke, the Stillwater Complex in the US and the Sudbury Basin in Canada. Table 50: Platinum Supply 2021 Platinum Supply Palladium Supply Rhodium Supply Source: SFA (Oxford) All statistics and their analyses are considered accurate as of March 2022. Auto, 2751 koz, 41% Jewellery, 1751 koz, 27% Chemical, 660 koz, 10% Glass, 479 koz, 7% Medical, 234 koz, 3% Others, 816 koz, 12% Pt demand: 2021 6.7 moz Auto, 7688 koz, 81% Jewellery, 215 koz, 2% Elect., 659 koz, 7% Chem., 654 koz, 7% Dental, 183 koz, 2% Others, 137 koz, 1% Pd demand: 2021 9.5 moz Auto, 941 koz, 89% Chem., 61 koz, 6% Glass, 18 koz, 2% Others, 39 koz, 4% Rh demand: 2021 1.1 moz S. Africa, 4703 koz, 74% Zimb., 493 koz, 8% Russia, 643 koz, 10% Canada, 215 koz, 3% USA, 150 koz, 2% Other, 161 koz, 3% Pt supply: 2021 6.4 moz S. Africa, 2742 koz, 39% Zimb., 414 koz, 6% Russia, 2587 koz, 37% Canada, 499 koz, 7% USA, 501 koz, 7% Other, 333 koz, 5% Pd supply: 2021 7.1 moz S. Africa, 666 koz, 82% Zimb., 44 koz, 5% Russia, 73 koz, 9% Canada, 18 koz, 2% USA, 4 koz, 0.5% Other, 8 koz, 1% Rh supply: 2021 0.8 moz 142 16.3.4 Palladium and Platinum Pricing Outlooks The near to medium term fundamental outlook for PGMs is robust. As the largest primary producer and recycler of PGMs in the world, Sibanye-Stillwater’s investments into the high return, organic growth projects positions us well to support PGM demand driven by increasing social pull and regulatory drive for a cleaner environment. Climate change targets in Europe and other parts of the world have resulted in renewed interest in the hydrogen economy. Longer term production of green hydrogen for industrial use is supportive of demand for both platinum and iridium. With the medium-term evolution of the automobile drive train from internal combustion engines (ICE) to greener technologies, such as battery electric fuel cell electric and hybrid vehicles, we continue to monitor and evaluate the sector for entry points that meet our strategic objectives. As our customers’ needs change, the opportunity for us to further build on our mining platform and diversify our offering will ensure that we remain preferred suppliers of strategic metals for tomorrow’s powertrains. Figure 51 illustrates the palladium and platinum price trends since 2000, expressed as nominal USD/oz. Figure 51: Price Trends 2000-2021 Source: SFA (Oxford) All statistics and their analyses are accurate as of March 2022. 0 5,000 10,000 15,000 20,000 25,000 30,000 0 500 1,000 1,500 2,000 2,500 3,000 3,500 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 $/oz PGM prices Platinum Palladium Rhodium (rhs)
143 16.4 Metals Price Determination Sibanye-Stillwater considers multiple trailing averages and forecasting scenarios for the determination of the commodity prices and exchange rates used as modifying factors for estimating Mineral Reserves. Mineral Reserves are estimated before the end of the calendar year. Sibanye-Stillwater uses the Q2 actuals process and forecasts for the remainder of the year to 31 December. The following are the commodities produced at Kroondal, the scenarios considered and the final parameters chosen. Additional comment on Risk is provided in Section 21.1.2. 16.4.1 Exchange Rate The three-year average and Mineral Reserve ZAR/USD exchange rate parameters are given in Table 51. Table 51: Exchange Rates Three Year Average July 2017 to June 2021 30 Months Average January 2019 to June 2021 Forecast to December 2021 Three Year Average January 2019 to December 2021 Mineral Reserve Price ZAR/USD exchange rate 15.54 15.27 13.90 15.04 15.00 16.4.2 Platinum Group Metals Price Deck The three-year average prices for the Platinum Group Metals (“PGM”) are tabulated below. For the Platinum Group Metals price deck, Sibanye-Stillwater forecasted the metal prices to the end of 2021 in order to determine a three-year average. Sibanye-Stillwater has declared PGM Mineral Reserves with the metals prices as in Table 52. 144 Table 52: PGM Deck Price Scenarios Unit Three Year Average July 2017 to June 2021 30 Months Average January 2019 to June 2021 Forecast to December 2021 Three Year Average January 2019 to December 2021 Mineral Resource Price Mineral Reserve Price Platinum USD/oz 959 934 1,125 965 1,500 1,250 Palladium USD/oz 2,164 2,013 2,722 2,132 1,500 1,250 Rhodium USD/oz 12,611 10,658 21,250 12,423 10,000 8,000 Iridium USD/oz 2,463 2,261 5,725 2,839 3,000 2,500 Ruthenium USD/oz 290 283 700 353 350 300 Nickel USD/tonne 15,128 14,567 17,943 15,130 17,500 16,200 Copper USD/tonne 6,819 6,688 9,612 7,176 10,000 8,950 Cobalt USD/lb 17 17 21 17 25 22 Chrome USD/tonne 143 147 153 148 165 150 Gold USD/oz 1,723 1,644 1,806 1,671 1,800 1,659 Basket Price USD/4Eoz 2,616 2,339 3,842 2,589 2,451 2,006 Basket Price R/4Eoz 40,643 35,702 53,425 38,940 36,767 30,093 16.4.3 Comparison to 2019 Prices Table 53 gives the price comparison between the Mineral Reserve prices at 31 December 2020 and 31 December 2021. 145 Table 53: Comparison of Mineral Reserve Prices Current and Previous Year 31-Dec-21 31-Dec-20 Precious metals USD/oz R/oz R/kg USD/oz R/oz R/kg Gold 1659 24,855 800,00 0 1,500 22,500 720,00 0 Platinum 1250 18,750 602,82 6 880 13,200 424,38 9 Palladium 1250 18,750 602,82 6 1,600 24,000 771,61 7 Rhodium 8000 120,00 0 3,858, 084 5,650 84,750 2,724, 772 Iridium 2500 37,500 1,205, 651 1,450 21,750 699,27 8 Ruthenium 300 4,500 144,67 8 260 3,900 125,38 8 Base metals USD/lb USD/tonn e R/tonne USD/lb USD/tonn e R/tonne Nickel 7.35 16200 243,00 0 5.90 13,000 195,00 0 Copper 4.06 8,950 134,25 0 2.72 6,000 90,000 Cobalt 22.00 33,069 727,52 5 15.00 33,069 496,04 0 Chromium oxide (Cr2O3)2, (42% concentrate)1 0.07 150 2,250 0.07 160 2,400 17 Environmental Studies, Permitting, Plans, Negotiations/Agreements 17.1 Social and Community Agreements 17.1.1 Overview Kroondal Operations’ social performance is guided by our socio-economic development agenda, which is aimed at ensuring that the Kroondal Operations contribute to the upliftment of the communities during and beyond mining activities. Sibanye-Stillwater’s performance is supported by authentic stakeholder engagement, fit for purpose systems, credible data and capability that aligns with international standards and locally negotiated commitments. Sibanye-Stillwater’s primary objective is to avoid harm to people and the environment, ensuring a stable operating environment in which all our stakeholders within the Company's footprint can derive value during the LoM. Sibanye-Stillwater will endeavour to create equitable engagement capability in host communities to ensure constructive dialogue with our neighbours. The key to responsible mining is 146 protecting the Company's reputation as work continues building the Sibanye- Stillwater brand globally. In line with Sibanye-Stillwater’s approach to creating and sharing value, in 2020/1, Rustenburg operations conducted broad based stakeholder engagement and a socio-economic baseline to understand the socio-economic needs of stakeholders. The engagement highlighted gaps in the municipality-led Integrated Development Plan (IDP) process, which is meant to determine and prioritize the needs of communities that ultimately inform our social and labour plans (SLPs). There was also an apparent misunderstanding of SLP funding and related responsibilities. The company has a shared environment with Anglo American, which is responsible for the implementation of the community development projects as part of the PSA. Communities expressed frustration, believing that the mines do not respond to their grievances, particularly in relation to Corporate Social Investment (CSI) programs, procurement and employment. To this end, the Company put in place a mechanism to ensure that a formal, proactive and responsive process is in place to deal with stakeholder grievances. The findings support the feedback the Company regularly receives from its engagement partners and therefore, engagement and communication have been strengthened to ensure that stakeholders are informed and where applicable engaged and consulted on issues of mutual interest. 17.1.2 Vision Sibanye-Stillwater’s vision is to unlock the potential of communities affected by its operations through economic empowerment, institutional development and creating a local benefit that inspires sustainable living. 17.1.3 Communities’ Priorities Kroondal community priorities are as follows: • Supporting communities to deliver local social economic benefits through economic empowerment and the delivery on the Mining Charter and Social and Labour Plan commitments. • Strengthening institutional capacity and unlocking and mobilizing partnerships and resources to resolve collective challenges. • Deliver on programs that retain sustainable community benefits and its social impacts that are well understood by all stakeholders. • Create shared value beyond compliance. • Facilitate integrated spatial development by improving the living conditions and surrounding amenities for our workers.
147 The PSA LED element of the SLP is implemented by Anglo American. Sibanye is implementing acquired backlog LED projects in the Kroondal (104MR) SLP. Table 54 provides the status. Table 54: Kroondal (104MR) SLP Projects No Project Name Status Year of Completion 1 Ikemeleng Infrastructure Development Completed 2017 2 Community Project- Skills development, Bursary funding & Facilitation of Local SMME Completed 2017 3 Tirelong School Yard improvement Completed 2019 4 Tirelong Early Childhood Centre Completed 2015 5 The formalisation of Ikemeleng legal In Progress 2022 6 Partnership in facilitating Ikemeleng/Kroondal Community Resource centres Lefaragatlha – In Progress 2022 Seraleng- In Progress 2022 7 Ikemeleng Chemical Toilets and VIP toilets In Progress 2022 8 Socio Economic Assessment ( Lapologang Agricultural Project) On Hold due to relocation of the community by Tharisa Mine(neighbouring property) 17.2 Human Resources 17.2.1 Introduction This section includes discussion and comments on the human resources, health and safety-related aspects associated with the Kroondal Operations. Specifically, information is included on the current organisational structures and operational management, recruitment, training, productivity initiatives and remuneration policies, industrial relations, safety statistics and performance. Kroondal follows the Sibanye-Stillwater Code of Ethics, which is fully compliant with the Sarbanes-Oxley Act of the United States of America. This policy was adopted and communicated to all employees. A Human Rights Policy has also been adopted, which confirms full compliance with all applicable International Labor Organisation Conventions. 17.2.2 Human Resources 17.2.3 Legislation Kroondal is committed to promoting Historically Disadvantaged South African’s (HDSA) in its management structure by instituting a framework geared toward local recruitment and human resources development. Vacancies are primarily filled by candidates from local communities. Where specialist skills are not available locally, they are sourced from outside local communities. The Mine’s long-term objective is 148 to have these skills shortages addressed via skills development programs(Table 55). Labour distribution and availability are shown in Table 56 and Table 56). Various regulatory authorities, in addition to mining and labour codes, govern labour legislation in South Africa. In general, these are well established in conjunction with current operating policies and form the cornerstone of human resource management. High-level compliance in terms of the following key acts and associated regulations was assessed: • Constitution of the RSA (Act 108 of 1996) (Constitution). • Mine Health and Safety Act (Act 29 of 1996) and amendments (MHSA). • The Occupational Health and Safety Act (85 of 1993) (OHSA). • Labour Relations Act, 1995 as amended. • Employment Equity Act, 1998 with specific reference to medical testing and HIV/AIDS. • Compensation for Occupational Injuries and Diseases Act, 1993. • Basic Conditions of Employment Act, 1997. • Employment Equity, 1998 and • Promotion of Equality and Prevention of Unfair Discrimination Act, 2000. Table 55: Undertaking and Guidelines Table 56: HDSA in Management as at the end December 2021 Prescribed Target Current Prescribed % by 2024 Occupational Level/Paterson Band Designated Non- Designated % Compliance Top Management (Board)* 50% Senior Management (EXCO)* 50% Senior Management (Other)* 60% 6 6 50% 60% Middle Management Levels 70% 61 26 70% 70% Junior Management Levels 70% 678 206 77% 70% Total HDSAs in Management 745 238 76% (Including Junior Management) 735 282 *These numbers are reflected in accordance with the Mining Charter requirements and these individuals are not employed by the Operation. Undertaking Kroondal is committed to attaining the 40% HDSAs in management target as set by the DMRE and recognizes that this refers to Management in the D, E and F Patterson bands. Guidelines Build capacity within the organisation through Human Resource Department (HRD) initiatives with preference given to individuals from designated groups. These employees to form the pipeline for the Company’s talent pool and succession planning. 149 Table 57: Breakdown of Employee Profile as at the end December 2021 Grade Occupational Level Number of Employees E Band Senior Management 12 D Band Professionally Qualified, Experienced Specialists and Middle Management 88 C Band Skilled Technical, Academic Qualified, Junior Management and Supervisors 898 B Band Semi-Skilled and Discretionary Decision Making 2 882 A Band Unskilled and Defined Decision making 1436 NG Learners and Trainees 22 Total Permanent and Temporary Employees 5,338 Employees temporary 59 Contractor Employees 3,139 Total Head Count 8,536 Table 58: Employee Turnover Reason 2018 2019 2020 2021 Death 16 25 26 44 Desertion 11 33 30 24 Dismissal 41 55 56 36 Medical 28 49 12 48 Group Transfer 0 0 0 0 Relocated to Contractor 0 0 0 0 Resignation 96 193 114 183 Retirement 23 55 115 39 Retrenchment 5 1 30 Grand Total 220 411 353 404 Table 59: Labour Unavailability and Absenteeism Description 2018 2019 2020 2021 Mine accident 0,2% 0,2% 0,3% 0,4% Sick 4,2% 4,3% 2,7% 4,2% Occupational health 0,0% 0,0% 0,0% 0,0% Unpaid leave 0,2% 0,1% 0,0% 0,0% AWOPs 0,2% 0,1% 0,4% 0,6% Training 1,4% 1,5% 0,6% 1,6% Leaves 7,5% 6,9% 2,9% 6,2% Other 0,6% 1,3% 6,9% 1,3% 150 17.2.4 Human Resource Development (Training) Kroondal has instituted a comprehensive program to train and develop its employees to the extent that they are able to function competently in their specific jobs, with particular reference to compliance with legislative requirements and to providing the capacity for individuals and teams to work safely and productively. These cover both technical/ vocational training and supervisory and managerial skills development. Kroondal typically spends a total of 5% of payroll on employee training and development programs. Specific areas of focus in the training and development programs include: • Functional literacy and numeracy; • Safe working practice training by means of programs aligned with the requirements of the National Qualifications Framework; • Interventions aimed at improving the business awareness and teamwork of employees at the lower levels of the organization in particular; • Improved middle management skills through the implementation of an internal leadership program to help fulfil the human resources requirement of the Mining Charter; • Systems to track and manage, on an integrated basis, employee development and performance; and • Portable skills training. 17.2.5 Remuneration Policies Kroondal operates remuneration and employee benefits policies that recognize labour market conditions, collective bargaining processes, equity and legislation. 17.2.6 Industrial Relations Industrial relations are managed at several levels and in several formalised structures, encompassing the corporate and mining asset domains in accordance with several key driving factors. These include the prevailing legislative requirements, regulatory bodies, labour representation, collective bargaining arrangements, sectoral and operation specific employer-employee agreements, and the quality of labour relations management philosophies and practices. An Employee Relations/Engagement framework also governs all engagements with organised labour and other stakeholders. The principal strategy elements are to entrench an improved understanding of the business imperatives on the part of labour, appropriate and timely intervention to pre-empt industrial relations issues and timely delivery by management on its undertakings to labour. Some 71% of the permanent employees of Kroondal are paid up members of registered trade unions and associations. Most of these unionised employees are from the lower skilled level and are represented by the Association of Mining and Construction Workers Union (AMCU). Historically, trade unions with such a constitution have exercised a strong influence over social and political reform. The
151 labour legislative framework reflects this by strongly empowering trade unions in the collective bargaining processes. The clear implication is that industrial relations are an area of critical focus for Kroondal. 17.2.7 Employment Equity and Women in Mining (WIM) The purpose of the Employment Equity Plan is to ensure that a demographically appropriate profile is achieved through the participation of HDSAs in all decision- making positions and core occupational categories at the Operation. In striving to achieve 60 - 70% HDSA representation in the management structure and 25 - 30% participation of women in core mining occupations, Kroondal seeks to redress the existing gender and racial disparities. The plan reflects Sibanye-Stillwater’s annual progressive targets and embrace the challenge to transform the composition of the Company’s workforce and management. This is a business imperative to ensure that we tap into the entire skill base of the South African population. All efforts in this regard have been aligned with the National Development Plan and the UN Global Goals for Sustainable Development in relations to: • no poverty. • zero hunger. • quality education. • gender equality. • decent work and economic growth and • reduced inequalities. Employment Equity Strategies are aligned to succession planning, development of the Company’s talent pool, learner development programs, core and critical skills training programs, career development plans, mentoring and coaching. The following Sibanye-Stillwater principles guide the way in which Employment Equity is implemented at Kroondal, and to further comply with our Ethics and Human Rights policies: • Recognizing historic inequalities, HDSAs and women with recognized potential are afforded special opportunities and additional support to realize their potential. • To fill each position in the Company with a fully performing individual. Thus, we will not create phantom jobs nor make token appointments. • Diversity is encouraged in the workplace and any form of racism is not tolerated. • Some employees in management positions may be involuntarily redeployed to make space for HDSAs and women. • All employees are developed to ensure that they are fully performing in their current jobs and, where applicable, to prepare them for future opportunities and • In placing women in jobs, the Company will take cognisance of the special risks to which women of child-bearing age, pregnant and lactating women should not be exposed. 152 Kroondal is required to translate the Sibanye-Stillwater company strategy to five- year action plans that are implementable and measurable. Kroondal is committed to create a workplace in which individuals of ability and competency can develop rewarding careers at all levels regardless of their background, race or gender. Kroondal’s employment practices and policies emphasize equal opportunity for all, and aim to identify, develop and reward those employees who demonstrate qualities of individual initiative, enterprise, commitment and competencies. Employment Equity policies also aim to create an inclusive organisational culture in which all employees are valued. The implementation of Employment Equity is overseen by senior management and is at the core of the mine’s strategy. Where appropriate, Employment Equity (Table 60 to Table 61) is implemented in consultation with employee representative bodies. As a key business imperative for Kroondal, Employment Equity is critical in assisting the Operation to place competent employees in the correct jobs aligned with the Operation’s objectives. These are: • Kroondal is committed to developing its employees to their greatest potential, which will contribute to the achievement of the Operation’s objectives. • Kroondal recognizes the need for continued investment in its employees through training and development, which is demonstrated through training and development opportunities and job placements with a focus on the development of key competencies, career path progression and retention of talent and • Kroondal has adopted proactive recruitment, selection and appointment policy, which favours candidates from designated groups. This has assisted the Operation in working toward the achievement of numerical goals of the Operation’s Employment Equity Plan. Table 60: Kroondal Total Employees Occupational Levels Male Female Foreign Total A C I W A C I W M F Senior management 5 0 0 0 1 0 0 6 0 0 12 Professionally qualified and experienced specialists and mid- management 34 1 0 15 7 0 1 26 4 0 88 Skilled technical and academically qualified workers, junior management, supervisors, foremen, and superintendents 559 5 0 210 67 0 1 36 20 0 898 Semi-skilled and discretionary decision making 1 628 2 0 29 291 0 0 5 926 1 2 882 Unskilled and defined decision making 704 0 0 1 485 0 0 0 243 3 1 436 Non graded 13 0 0 0 9 0 0 0 0 0 22 TOTAL PERMANENT 2 918 8 0 80 850 0 2 243 1 193 4 5 338 153 Table 61: Kroondal Total Contractors (excluding Ad- Hoc Contractors) Occupational Levels Male Female Total A C I W A C I W Senior management 2 0 0 13 2 1 0 1 19 Professionally qualified and experienced specialists and mid-management 35 0 0 14 1 1 0 4 55 Skilled technical and academically qualified workers, junior management, supervisors, foremen, and superintendents 161 4 1 115 13 0 1 10 305 Semi-skilled and discretionary decision making 900 2 0 31 65 0 0 13 1 011 Unskilled and defined decision making 1 495 8 0 14 135 0 0 0 1 652 Total Contractors 2 571 14 1 182 217 2 1 28 3 043 17.3 Health and Safety 17.3.1 Policies and Procedures Since Sibanye-Stillwater’s inception, Kroondal Operations has formed part of the Health and Safety Strategy and Policy development process, as well as the adoption and implementation thereof. The Safe Production Strategy that was developed as part of an ongoing safety improvement journey takes into account “fit for purpose systems” such as ISO 45001 that was published in 2018. The Sibanye- Stillwater Health and Safety Strategy and Policy is further aligned with the Mine Health and Safety Act, the International Council on Mining and Metals, the World Bank Policies and Guidelines, International Finance Corporation Operational Policies and International Labour Organisation Conventions. 17.3.2 Statistics Table 62 presents safety statistics for Kroondal and includes the total number of fatalities, fatality rate and the lost day injury frequency rate (LDIFR) from 2016 to 2021. Table 62: Safety Statistics Units 2016 2017 2018 2019 2020 2021 Fatalities (No) 2 0 1 0 1 2 Fatality Rate (per mmhrs) 0.07 0.00 0.05 0.00 0.07 0.14 LDIFR (per mmhrs) 4.65 4.83 6.36 4.24 6.83 4.87 MHSA Section 54’s (No.) 28 27 9 4 8 10 mmhrs = million man hours worked 154 17.3.3 Occupational Health and Safety Management As part of the rollout of the Safe Production Strategy, the management of Critical Controls, Rules of Life, Risk Management as well as management of A Hazards were a key focus area at the operations. The challenges in terms due to COVID-19 are ongoing and are dealt with at the shafts. The Kroondal Operations achieved 2 million fatal free shifts on 21 May 2021, prior to the fatalities that occurred. 17.3.4 HIV/AIDS Prevalence of HIV/AIDS at the Kroondal Operations, including both Rustenburg and Kroondal Operations is currently at around 15% of the workforce. However, the impact on sick absenteeism and mortality due to this pandemic is relatively low. This is attributed to the development and implementation of effective and comprehensive HIV/AIDS programmes, which includes the following elements: • Creating a supportive workplace environment where discrimination is not tolerated to allow employees with HIV/AIDS to remain employed and productive. • Access to Primary Health Care Clinics and Occupational Health Centres providing voluntary, confidential counselling and testing. • Aggressive treatment of sexually transmitted diseases, which in turn reduce the risk of HIV infection. • Prophylaxis and treatment of opportunistic infections related to HIV/AIDS. Access to Antiretroviral therapy to help employees with HIV/AIDS to stay healthy and productive. 17.4 Terminal Benefits The total terminal benefits liability (TBL) for Kroondal Operations has been determined by consideration of various employee requirements of the LoM profile. This number has been estimated at ZAR 484 million. 17.5 Environmental Studies 17.5.1 Introduction As part of the Sibanye-Stillwater, Integrated Compliance, Governance and Risk (ICGR) framework, the Company has embedded a process for improved regulatory risk profile and action plans to address any gaps in the identification of risk, level of adequacy and effectiveness of control measures. This has provided the Environmental and Corporate Affairs Departments with a much clearer picture of all the legal requirements, its risk exposure and what mitigatory actions (compliance risk management plans) need to be put in place to improve and ensure compliance. Updated and detailed public reports are available at Environment | Sibanye-Stillwater (sibanyestillwater.com).
155 The following generic environmental risks have been identified and are applicable to the Kroondal Operations: • Lack of clarity from regulators in respect of Regional Closure and ground water pollution plume rehabilitation. • The carbon tax implementation. • The inclusion of VAT to the existing closure provisions. • The quantification of as-yet unknown latent and residual liabilities and the resultant impact on the final quantum of the closure liability and/or our closure strategies. • The sustained provision of potable water to our platinum operations in the Rustenburg area and • Ongoing operational compliance to current and new environmental legislation. In addition, and from an Environmental, Social and Governance (ESG) perspective, the following key environmental and social legislation, and its associated subsequent amendments, was identified to be applicable, wholly or partially, to the Kroondal Operations: • Constitution of the RSA, 1996. • The Companies Act, Act 71 of 2008. • King IV Report on Corporate Governance for South Africa 2016 (Institute of Directors in Southern Africa NPC). • Promotion of Administrative Justice Act, Act 3 of 2000. • Protection of Personal Information Act, Act 4 of 2013. • Minerals & Petroleum Resources Development Act (MPRDA), Act No 28 of 2002 and all its Regulations and subsequent Amendments. • National Environmental Management Act (1998). • National Environmental Management: Biodiversity Act, Act No 10 of 2004. • National Environmental Management: Waste Act, 2008. • National Nuclear Regulatory Act, 1999. • National Environmental Management: Air Quality Act (NEM:AQA), Act No 39 of 2005. • National Water Act (NWA), Act No 36 of 1998. • Water Services Act (NWS), Act 108 of 1997. • Labour Relations Act, Act 66 of 1995. • Mineral and Petroleum Resources Royalty Act 28 of 2008. • Hazardous Substances Act, Act No 15 of 1973. • National Heritage Resources Act (NHRA), Act No 25 of 1999. • National Forest Act, Act No 84 of 1998. • National Road Traffic Act, Act 93 of 1996. • Road Transportation Act, Act 74 of 1977. • Fertilizers, Farm Feeds, Agricultural Remedies and Stock Remedies Act, Act No 36 of 1947. • Conservation of Agricultural Resources Act (CARA), Act No 43 of 1983. 156 • National Veld and Forest Fire Act, Act No 101 of 1998. • National Environmental Management: Protected Areas Act, Act 57 of 2003. • Promotion of Access to Information Act, 2000. • Agricultural Pest Act, Act No 36 of 1983. • Skills Development Act, Act 97 of 1998. • Skills Development Levies Act, Act 9 of 1999. • Broad-Based Black Economic Empowerment Act, Act 53 of 2003 and • Employment Equity Act, Act 47 of 2013. An important change in the regulation of mining related environmental activities was that on 8th December 2014, with the launch of the so-called “One Environmental System” (OES), the Minister and thus the DMRE became the Competent Authority for environmental issues within the mining industry. The Minister of Environmental Affairs -Department is now referred to as the Department of Environment, Forestry and Fisheries (DEFF) became the appeal authority for mine environmental issues. Since its inception in 2014, the OES has not yet fully taken off. Not all of the relevant Government Departments/Regulators seem to be on-board with the new, stricter approval timeframes and/or other OES requirements which has led to the implementation of OES being, at best, mediocre and at worst, not meeting applicants’ expectations. In November 2015, the regulations regarding Financial Provisioning Regulations, 2015 (FP Regulations) were gazetted, with onerous legal obligations around financial provisioning on several closure-related issues. The mining industry has and is in the process of challenging these proposed FP Regulations, with a view to have the most onerous Regulations excluded from any revised FP Regulations. Stakeholder engagement and consultation on the revised FP Regulations is ongoing, and while the compliance date for the 2015 FP Regulations has been set as 19 June 2022, the final amended FP Regulations have not been formally promulgated as yet – the expectation is that the amended FP Regulations will be promulgated before the compliance date of June 2022. Sibanye-Stillwater has participated in previous public participation processes on these FP Regulations, either as an interested and affected party, or as a member of the Minerals Council of South Africa. 17.5.2 Baseline Studies 17.5.2.1 History The first Environmental Management Programme (EMPr) for Kroondal was approved in 1999. The EMPr was modified via various amendments during mine development in 2001,2004 and 2010. A consolidated EMPr for Kroondal was compiled in 2016 to combine the 1999 EMPr and all EMPr Amendments and updates into a single document. This document has since been revised in 2022 upon request from the DMRE in order to conclude approval of the consolidated document. The first Environmental Management Programme (EMPr) for PSA was approved in 2002 for K5 (Kwezi) Shaft, followed by an addendum which was 157 approved in 2003. The first EMPr for Klipfontein Open-Pit and MK4 Shaft was approved in 2005. The first EMPr approval for K6 Shaft was in 2010. In 2016 these EMPr’s were consolidated into a single EMPr for PSA and approved by the DMRE. The purpose of these baseline and amended EIA and EMPr’s intended to achieve the following: Submitted in support of existing mining rights in terms of Section 102 of the Mineral and Petroleum Resources Development Act, 2002 (Act No. 28 of 2002) (MPRDA) and Chapter 5 of the National Environmental Management Act, 1998 (Act No. 107 of 1998) (NEMA). The amendment and consolidation of several existing approved EIA’s and EMPr’s in accordance with the DMRE EIA and EMPr template format as posted on the official DMRE website (at time of submission) and with what is prescribed by Appendix 4 of the NEMA EIA Regulations, 2014 (GNR 982). The amendment and consolidation process were undertaken for approved activities that already had environmental authorisation and, in this regard, no additional NEMA authorisation was applied for / required as part of this process. This is emphasised by section 12(4) of the National Environmental Management Amendment Act, 2008 (Act No. 62 of 2008) (NEMA), which states that an EMPr approved in terms of the MPRDA prior to 8 December 2014 when the NEMA EIA Regulations, 2014 came into effect must be regarded as having been approved in terms of the NEMA, under the guise of the DMRE. As required by Regulation 35 of the EIA Regulations, 2014, the EIA and EMPr were subjected to an appropriate public participation process which consisted of public and regulatory authority review of the EIA and EMPr report. All comments received during the review process are included in section 7.3 and were submitted to the competent authority as part of the final EIA and EMPr report. 17.5.2.2 Impact Assessment 2016 The assessment of the impacts for the 2016 EMPR was conducted according to a synthesis of criteria required by the integrated environmental management procedure. This methodology was constructed by SLR Consulting (Africa) (Pty) Ltd, the consultants who compiled the studies. A summary of study areas and assessed environmental Impacts is given in Table 63. Table 63: Summary of Anticipated Environmental Impacts (revised EMP,2016) Section Potential impact Significance of the impact (the ratings are negative unless otherwise specified) Unmitigated Mitigated Geology Loss and sterilisation of mineral resources High Medium 158 Topography Hazardous excavations/structures/surface subsidence High Medium Soil and land capability Loss of soil resources and land capability through pollution High Medium Loss of soil and land capability through physical disturbance High Medium Terrestrial Biodiversity Physical destruction of biodiversity High Medium General disturbance of biodiversity High Medium Aquatic Biodiversity Physical destruction and / or disturbance of aquatic biodiversity High Medium Surface water Pollution of surface water resources High Medium Alteration of natural drainage patters High Medium Groundwater Contamination of groundwater resources High Medium Dewatering High Medium Air quality Air pollution High Medium Noise Noise pollution High Medium Visual Visual impact Medium Medium Blasting Blasting impacts (fly rock, air blasts and ground vibrations) High Medium Traffic Traffic impact High Medium Heritage/ cultural and palaeontological resources Loss of heritage, cultural and palaeontological resources High Medium Socio-economic Economic impact High positive High positive Inward migration High Medium Land use Land use impact High Medium 17.5.2.3 Methodologies for Impact and Risk Assessment The assessment results and criteria in the studies presented above are as submitted by the companies undertaking the assessments. Sibanye uses consultants for the specialists' studies. Each company has its own methodologies that it applies. Where there are no material conflicts with Sibanye’s criteria, other studies or regulatory requirements the methodologies are accepted as valid. 17.5.3 Zone of Influence 17.5.3.1 Studies and Methodologies The Zone of Influence of the project the Kroondal Operations is defined as the area within which it has or can have material impacts or can influence impacts due to the establishment and continuation of the project’s activities, products or services.
159 The Zone of Influence is unique to each project and each aspect thereof, is larger than the actual project footprint and can either be positive or negative. The Zone of Influence is determined by evaluating and mapping the following environmental and social components of the project: Footprint and areas directly adjacent to the infrastructure erected for the project. The areas affected due to the following definitions: 1. Secondary impacts arise from other impacts that are directly due to the development. 2. Induced impacts are due to unplanned/unintended/secondary activities that are ‘catalysed’ by the project. 3. Cumulative impacts are results of numerous individual activities, which might not be material on their own, but which can interact or combine to cause material impacts. These areas can typically be impacted by surface and groundwater abstraction, surface and groundwater usage or discharges, seismicity, air quality, noise, visual and soil impacts, as well as invader vegetation infestation, protected areas destruction, loss of important biodiversity areas, and any other material impacts that may be identified during the Zone of Influence determination; Areas that will be deriving economic benefits from the project like adjacent towns and communities, as well as labour sending areas; and Surrounding environmental areas that can benefit or be impacted upon by the project. For each environmental aspect, the Zone of Influence is determined independently and displayed on a map. A composite Zone of Influence for the entire project is then eventually determined. For its major environmental aspects (e.g.: water discharges and air emissions) and resulting material impacts Kroondal has extended monitoring programmes and management systems in place to ascertain its impact on the environmental and surrounding communities and therefore has a very good understanding of its material impacts on the above-mentioned areas. Management systems and procedures are in place to deal with those identified material impacts. Specialist studies required for environmental authorisations and Environmental Impact Assessments (EIA’s) are further valuable sources of information to determine those areas potentially impacted upon by the project. Future specialist studies should include an update or revision of the Zone of Influence map for each aspect and material impact as well as a combined Zone of Influence per aspect. These are updated at varying frequencies as informed by specialist studies. The determination and display of a composite Zone of Influence that includes environmental, social and economic issues is a complex matter and has not been attempted by Kroondal yet. Current Zone of Influences are provided only for 160 surface water resources as described in the Water Strategy Section of this report. Kroondal Operations have not determined the composite Zone of Influence (due to its complexity for a large-scale mining operation), but an individual specialist zone of influences have been compiled as part of environmental risk management. Examples: noise, visual, air, surface and groundwater. An attempt will be made in 2022/3 to determine, map and collate a composite Zone of Influence for Kroondal that may or may not also include the social Zone of Influence. Focus is currently placed on the determination and update of each aspect of the zone of influence through integrated specialist studies. These commenced in 2021 and will be completed in 2022, only thereafter can integration be pursued. For each environmental aspect the Zone of Interest is determined independently and displayed on a map. A composite Zone of Influence for the entire project is then eventually determined. For its major environmental aspects (e.g., water discharges and air emissions) and resulting material impacts Kroondal has set monitoring programmes and management systems in place to ascertain its impact on the environmental and surrounding communities, and therefore has a very good understanding of its material impacts on the above-mentioned areas. Management systems and procedures are in place to deal with those identified material impacts. Specialist studies required by environmental authorisations and Environmental Impact Assessments (EIAs) are further valuable sources of information to determine those areas potentially impacted upon by the project. Future specialist studies are expected to include an update or revision of the Zone of Influence map for each aspect and material impact, as well as a combined Zone of Influence per aspect. 17.5.3.2 Groundwater The groundwater Zone of Influence represents the following two scenarios: • Secondary Impacts: These are currently defined by the pollution plumes emanating from waste storage facilities, namely the TSFs and Surface Rock Dumps (“SRDs”); and • Induced and Cumulative Impacts: These are presented by the dewatered areas to allow for mining. A comprehensive update of the groundwater specialist studies was undertaken in 2021 and will be completed in 2022, this will be incorporated into the 2023 TRS. The current groundwater data indicates that the zone of influence from a water quality perspective is largely limited to the source (boreholes located at the TSFs, dirty water dams and waste rock dumps) and plume boreholes (boreholes located within the expected plumes of the TSFs, dirty water dams and waste rock dumps). No dewatering impacts are expected or are highly localised to the shaft areas. Impacts from groundwater contamination may however occur on the adjacent Kroondal Tributary, due to the location of the contamination sources within the 161 buffer area, and in some case historical area of the wetland. These impacts occur as a result of ground-surface water interactions. Refer to the Surface Water discussion for further information. 17.5.3.3 Surface Water The surface water Zone of Influence is made up of areas influenced by secondary, induced and cumulative impacts. However, the assessment of cumulative and induced impacts still requires further investigation as these impacts may be far- reaching and they become less apparent due the activities of others in the catchment. Alternatively, they may only become apparent in the future dependent on the environmental context, such as the climatic conditions. The Zone of Influence’s represented below consider the secondary impacts that have been evaluated as associated with the current operational area of the mine. 1. Secondary Zone of Influence The watercourses within this section of the Zone of Influence represent activities within the wetlands, drainage lines, rivers and the recommended buffer areas that have the potential or have already caused a change to the ecological function and service provision of the wetlands. An updated and detailed wetland delineation is being undertaken to ascertain an improved zone of influence. 2. Induced and Cumulative Impacts Zone of Influence The Zone of Influence for the induced and cumulative impacts has been determined based on the compliance of the water quality of the surface water bodies. The end of the impact is considered to be the point at which 95% compliance to the Resource Water Quality Objectives (“RWQO”) has been achieved for the year to date. The use of water quality as a means of determining compliance implies that all potential impacts whether from direct discharges, diffuse seepage and/or groundwater interflows would be assessed against the current applicable standards. The majority of the Kroondal Operations are located within the catchment of a tributary of the Hex River, hence the Hex River RWQOs have been used. However, it must be noted that the Kwezi (K5) and K6 Shaft operations are located in the Dorpspruit (also a tributary of the Hex River), these shafts however are located more than 500m from the nearest wetland, have limited dirty water areas that may contribute to seepage pollution and have no discharges, hence they are not considered to be impacting on the water resources at this time and not included in the current zone of influence. The Marikana (Aquarius) operations also have not been provided with a zone of influence as the surface water resources downstream of the operations have been consistently dry throughout 2021, thus no assessment against the RQOs can be performed. This assumption will continuously be re-evaluated as data and specialist studies continue. The tributaries and associated river systems for the abovementioned areas are however assessed in the RPM and Marikana TRS’ as these operations are located downstream of the Kroondal and Marikana (Aquarius) operations. 162 The Kroondal Operations make-up almost the entirety of the Kroondal Tributary’s catchment, as such water quality is heavily influenced by the mining operations. The impacts relate primarily to nitrate enrichment and elevated chlorides associated with the TSFs and dirty water dams. Numerous action plans are in place to improve the water quality and reduce the impacts to the tributary. The point AQS01 only shows 51% compliance to the RWQOs, while the point AQS06 improves to 72% compliance (Figure 5252). Although the zone of influence criteria was not satisfied (I.e. 95% compliance to the RWQOs), the downstream Hex River system is considered in the RPM zone of influence and thus the Kroondal zone of influence cannot be further extended downstream. Although the water quality compliance to the RWQOs is poor it is expected that with the implementation of mitigation and restoration measures, the compliance can be improved to acceptable standards. Figure 52: Kroondal Operations Zone of Influence 17.5.3.4 Visual Zone of Influence The latest Study on the visual Zone of Influence was completed in 2014(Newtown 2014). Prior to the establishment of the Kroondal Platinum Mine, the broader landscape already had a prominent mining influence as well as agriculture and rural residential (formal and informal land uses. The existing mining infrastructure at the time was in stark contrast to the natural or agricultural surrounds and dominant in most views within the area. Given this, the pristine appearance of the natural environment was considered to be already compromised prior to the establishment of the Kroondal Operations (SRK, 1999 Arnot and Stobart, 2016).
163 The landscape character of the broader area consists of slightly rolling plains with singular and clusters of smaller koppies. The Magaliesberg mountain range is a major landform which runs east-west approximately 10 km to the south. Due to extensive mining over a long time-period, mining activities as well as dumps and storage structures of the mines, have become an integral part of the landscape topographical features and character. Interspersed with the mining operations are the Klipfontein, Waterval and Waterkloof Villages, small-to-medium businesses and farming activities. The mine and its surrounds have a strong sense of place dominated by the mining structures and activities within the study area. Another strong component is the residential settlements and the agricultural land use. The agricultural land use type is however a more prominent land use south of the N4 highway / R104 main artery and therefore gives the area a more pastoral sense of place. The area to the north of the N4 highway / R104 is dominated by mining activities with associated infrastructure as well as the townships and settlements associated with the mines. When viewed from the perspective of tourists and community members, mining activities could be associated with a sense of disenchantment. People who benefit from the operations (employees, contractors, service providers, etc.) may not experience this disenchantment and be less susceptible to changes in the view. Sensitive viewers include farmsteads/residences and tourist travellers along tourist routes. It is however noted that the views already include the current mining activities and structures. Thus, the sensitivity of viewers has already been compromised by the existing land use within the study area (Newtown, 2014). Visual Zone of Influence study of 2014 is still relevant for the Kroondal Operations. Sibanye- Stillwater has not as yet undertaken an update. This will be developed given budgetary and time constraints. 17.5.3.5 Noise Zone of Influence A Noise Zone of Influence for the Kroondal Operations has not as yet been developed and will be developed given budgetary and time constraints. 17.5.4 Climate Change and Greenhouse Gas Emissions Sibanye-Stillwater considers climate change as one of the most pressing global environmental challenges of our time. Sibanye-Stillwater recognises the importance of proactively managing its carbon footprint in the global context and is committed to contributing to a global solution through the deployment of responsible strategies and actions. To this effect, Sibanye-Stillwater monitors and reports on its carbon emissions (Table 64). Sibanye-Stillwater uses the Department of Environmental Affairs, Technical Guidelines for monitoring, reporting and verification of greenhouse gas emissions by industry (Version No. TG-2016.1 of April 2017) and the World Resources Institute, Greenhouse Gas (GHG) Protocol for determining its carbon inventory. 164 Furthermore, Sibanye-Stillwater is committed to contributing to a global solution by deploying responsible strategies and actions in the areas within which we operate: • Implement the group energy and decarbonization strategy. • Drive and achieve a carbon neutral position by 2040. • Drive an absolute reduction of Scope 1, 2 and 3 GHG emissions to achieve a science-based target (Science Based Target Initiative (SBTi) approved) that is required to keep global temperature increases below levels recommended by the latest climate science. • Drive and implement initiatives and programmes to assess and understand our GHG emissions profile and carbon footprint in order to optimally reduce our carbon footprint. • Implement the sourcing of carbon offsets in line with the Sibanye-Stillwater Carbon Offset Strategy, legislation and other principles that can be used to offset carbon emissions and that has the potential to offset the financial liability imposed by a carbon tax in specific jurisdictions. • Promote awareness and drive initiatives to combat the impact of global warming and climate change. • Deploy effective climate risk management strategies, taking into consideration ESG risks and stakeholder perceptions of risks. • Adhere to the requirements as set out in Sibanye-Stillwater’s policies, position statements and procedures. Table 64: Kroondal Emissions Inventory 2021 Scope of emissions Emissions (tonnes carbon dioxide equivalent – tCO2e) Scope 1: Emissions from direct fuel sources such as petrol and diesel 27,171 Scope 2: Emissions from purchased electricity 387,555 Scope 3: Emissions from other indirect sources such as purchased goods and services 236,875 The South African Government has set out the country’s nationally determined contributions to follow a peak-plateau-decline trajectory, where greenhouse gas emissions peak in 2020 to 2025, plateau for a ten-year period from 2025 to 2035, and decline from 2036 onwards. Sibanye-Stillwater set a target in accordance with the science-based methodology to reduce its carbon emissions by 27%, from its 2010 base year by 2025. A base year is a reference point in the past with which current emissions can be compared. In order to maintain the consistency between data sets, base year emissions need to be recalculated when structural changes occur in the company that change the inventory boundary (such as acquisitions or divestments). 165 The base year emissions for Sibanye-Stillwater, recalculated in 2018 to incorporate the emissions from the US Operations, amount to 7 808 692 tCO2e. In 2022 the emission reduction target will be reviewed to include the Kroondal Operations and to incorporate the group carbon neutrality goal. Carbon Project The Afrigle System has been implemented at all the shafts. The project entails a fuel management system (FMS), installed at all the shaft’s filling stations. The system provides accurate, automatic, electronic records and real-time reporting of fuel usage and eliminates driver intervention, data manipulation, unauthorised refuelling, possible theft and human error, enabling each shaft to understand their usage and better control fuel consumption and their resulting emissions. 17.5.5 Biodiversity Management Since Sibanye-Stillwater took ownership of the Operations, there were no major infrastructure expansions that would have resulted in the loss of key biodiversity areas. Nevertheless, biodiversity management continues in terms of the following initiatives: • Update of Biodiversity Management and Action Plans associated specialist studies with specific focus on alien and invasive plant management; • Wetland delineations and health assessments, including impact assessments where new projects or project changes are planned to occur; • Surface water monitoring in terms of quality, quantity and biological taxa composition; and • For any new projects, the Environmental Impact Assessment and Basic Assessment processes are also implemented which incorporate the identification of important biodiversity areas such as wetlands, cave systems and ridges. South African Non-Profit Organisation, the Endangered Wildlife Trust (“EWT”), has taken the lead in South Africa in developing an international voluntary reporting mechanism, called the Biodiversity Disclosure Project, similar in approach to the Carbon Disclosure Project. Sibanye-Stillwater contributed to the final document, the Biological Diversity Protocol (“BDP”), and has completed its first assessment of the BDP for its operations and will be reporting on this in the 2021 Annual Integrated Report. The assessment includes hectare equivalency accounts for ecosystems and plots the planned changes over time in order to inform management and mitigation measures to achieve our target of a net gain in biodiversity as based on the ecosystem state at the date at which Sibanye-Stillwater took ownership of Kroondal. The assessment currently focusses on ecosystems and new mechanisms will be investigated in order to effectively assess species population data in a meaningful manner as current assessment measures are considered to be unviable (due to 166 large areas and security considerations) and arbitrary (due to challenges in seasonality, specialist availability and geographical extent). Sibanye-Stillwater developed its first Biological Diversity Procedure that embeds the mitigation hierarchy into all decision-making processes from feasibility to post- mining. It ensures the use of the best practice local science-based methods for monitoring and assessment, the outcomes thereof are then incorporated into option analyses along with consideration of health, safety, engineering, social and economic considerations to arrive at the best practicable and sustainable way forward. Ultimately it aims to enhance avoidance of impacts on sensitive ecosystems and thereafter integrate mitigation, restoration and off-setting to achieve our net gain and no net loss targets as applicable to the sites. Managed by the EWT, the BDP will build the capacity of businesses to manage their biodiversity risks and opportunities and enable them to disclose their biodiversity performance in a standardised and comparable manner. 17.5.6 Water Use Strategy Sibanye-Stillwater recognizes water as a critical resource. The Company further considers its integrated approach to the management of our water footprint and our water systems infrastructure as a key component of its business strategy. The context summary of water use at the Kroondal Operations for 2021 is presented in Figure 53. The Kroondal Operations, the operations most vulnerable to water scarcity, abstracted on average 9.95 Ml/day to process 19,316 tonnes per day. 31% of this was purchased from Rand Water Board, supplied from the Vaal River System (VRS). Figure 53: Kroondal Water Use Summary 2021
167 17.5.6.1 Licensing Kroondal Operations operate with approved water use licenses. These licenses were obtained for Kroondal, Kwezi and Marikana on 19 July 2011, 24 June 2011 and 4 October 2013, respectively. In addition, Kroondal and Marikana submitted their Integrated Water Use Licences Amendment Applications (“IWULA) on 31 October 2012 and 26 August 2014, respectively, and are awaiting approval for both amendments. Kroondal Operations received the K6 WUL on 02/07/2021, and the first external audit was already conducted in November 2021. 17.5.6.2 Geohydrological Analysis and Pumping Strategy Geohydrology Three studies undertaken in 2009, 2010 and 2012 to characterised deep and shallow ground flow conditions in Kroondal concluded apart from sections of the Hex River /Small Hex River fault system, there appears to be no major deep groundwater storage or hydraulic connectivity associated with the regional structures exposed underground. Deep fissure inflow is generally limited to seepage and low inflow zones (associated with structural features). Hydro-chemical and isotope data indicate either the presence of old hypersaline groundwater with no significant recent groundwater recharge or as in the case of the Hex River /Small Hex River fault system, mixed saline and recharged surface water suggesting areas of circulation ( Figure 54 and Figure 55). Pumping Strategy Shafts are equipped with water handling infrastructure to: - Supply workings with required water; - Treatment and recycling of water to minimise top-up requirements; and - Pump systems to enable water re-cycling and removal of excess fissure water to ensure safe workings. Some of the shafts on care-and-maintenance is used primarily for the removal of excess fissure water to ensure safe workings. Excess water is directed to other process users such as concentrators. The water handling infrastructure is operated and maintained in accordance with engineering standards and procedures. 168 Figure 54: Rustenburg Regional Structures (Source: Zimmermann et.al., 2009) 169 Figure 55: Sub-quaternary Reaches around Kroondal and source of potential contamination 17.5.6.3 Discharge All water on the mining operations is kept in a closed water reticulation and therefore, no discharges are experienced on a continuous basis. However, from time to time, the operations may experience a dam overflow due to heavy rainfall in the summer periods. Our strategy is to minimise or eliminate any uncontrolled discharges through our storm water management systems and optimising dam capacity management. 17.5.6.4 Usage and Storage The water distribution diagram of the Rustenburg – Kroondal Complex is presented in Figure 56. There are currently six active WWTW facilities namely the Khuseleka and Municipal WWTW situated in the Paardekraal Complex, the K5 WWTW situated in the Kroondal West Complex, the Waterval WWTW in the Waterval Village area of the Paardekraal Complex and the K1 and K2 WWTW facilities situated in the Kroondal East Complex. Eight active Tailings Storage Facilities (TSFs) receive tailings deposits from the various concentrator plants. Three of these TSFs (PK Central, PK 4 and PK 5) are located in 170 the Paardekraal Complex, three (K1, K150 and K2) are located in the Kroondal East Complex, one (Hoedspruit) in the WLTR Klipfontein Complex section and one (Marikana) in the Klein Marikana Complex. Waterval West and East Tailings Dams in the Paardekraal Complex are not active and only receive rainfall runoff. The Klipfontein Tailings Dam in the WLTR Klipfontein Complex is re-mined and receives recovered tailings from the Waterval East e-feed transported with trucks to the Klipfontein Tailings Dam from where the slurry is pumped to the WLTR Concentrator. Potable water is supplied to various villages and hostels located in the Rustenburg - Kroondal Complex. 17.5.6.5 Water Conservation and Water Demand Management WCWDM Sibanye-Stillwater listed the following strategic objectives as Water Conservation and Water Demand Management (WC focus areas): Objective 1: Demonstrating thought leadership in WCWDM practices; Our WCWDM plan presents a strategy and specific initiatives that aims to drive industry leading performance when it comes to responsible water management practices. Our aim is to align our strategy and initiatives to regional, national and global strategies, where each initiative is implemented after thoroughly considering and aligning to all relevant social, environmental and governance requirements. Objective 2: Drive business sustainability through ensuring availability of water to support safe and productive operations – water security and water independence; Objective 3: Minimise the impact of our operations on water resources; Achieve this through: • Responsible and efficient use of water; • Minimise uncontrolled and unlicensed discharge of water; and • Minimise pollution of water. Our plan is to improve the recovery of water from large facilities such as Tailings Storage Facilities (TSF’s) and rock dumps. It also consists of monitoring regimes used to identify and minimise water leakages and excessive use. We drive initiatives required to improve water storage and the control of process dams for each operation. Water polluted with fuels, oils, greases, heavy metals, salts and other possible pollutants are not fit for operational or potable use. It is not permitted to discharge water polluted beyond specified limits. Therefor pollution must be kept to a minimum. Our strategy aims to optimise the re-cycling of effluent water. Objective 4: Drive business sustainability through continuous improvement, effective governance and meaningful stakeholder engagement to promote WCWDM;
171 Each initiative in the WCWDM plan carefully considers business sustainability, such as risk and cost, and is evaluated, designed and implemented within defined governance framework and procedures. A comprehensive Legislated Environmental Activity Procedure (LEAP) ensures that affected stakeholders are consulted and considered in the implementation of projects. The aim of Sibanye- Stillwater is to embed a culture of responsible water use among our employees and stakeholders. Objective 5: Drive sustainable mine closure strategies Given the priority of sustainable post mining economies, the management of water resources to benefit the region post-closure is important. Our aim is to implement closure strategies that considers the opportunities and risks associated with water resources available for future communities and economies. Figure 56: The Schematic Process Flow Diagram for Water Handling at the Rustenburg-Kroondal Complex 172 17.5.7 Waste Management The Kroondal Operations' waste management procedure follows the standard procedure outlined for the SA PGM operations. This procedure deals with all non-mineral general and hazardous waste streams generated at the various sites as is aligned with the waste inventory for the site. This procedure outlines the applicable legislation and required authorizations, storage and handling procedures, and lines of responsibility for mine residues and non-mineral wastes as classified in the 2015 study by En-Chem Consultants (Baldwin 2015). The SA PGM Segment developed and implemented new waste signage during 2021 in alignment with the waste classification regulations and best practices. This is in support of waste sorting at the source as well as to maximise reuse and recycling capabilities at our operations. From a strategic waste management perspective, Sibanye-Stillwater published a Waste Position Statement in 2021, in which our strategic position on waste was communicated to internal and external stakeholders. Sibanye-Stillwater has committed to zero-waste-to-landfill by 2030, and this includes driving concepts and principles such as waste management hierarchy, a circular economy in which waste plays a more prominent role and waste minimisation. Waste reduction targets for specific priority waste streams are being investigated and will be set for implementation in 2023 and beyond. Tailings Storage Facilities (are described in the Tailings Section (15.2) and Waste Rock Dumps are managed in accordance with the Mandatory Code of Practices for the relevant Mine Reside Deposits. 17.5.8 Environmental Reporting 17.5.8.1 Audits In order to ensure continued compliance to the various licenses in place for the Operation, numerous internal and external audits are performed at varying intervals, based on the regulatory as well as practical management requirements associated with the relevant authorisations. The audit frequencies are summarised in Table 65 below: Table 65: Kroondal Environmental Audits Authorisation Frequency of audit Environmental Audit of the Kroondal Platinum Mine EMPR Biennial Environmental Audit of the PSA EMPR Biennial Internal Audit of the Kroondal Water Use Licence Annual Internal Audit of the K5 (Kwezi) Water Use Licence Annual External Audit of the Kroondal Water Use Licence Biennial External Audit of the K5 (Kwezi) Water Use Licence Annual External Audit of the K6 Water Use Licence Annual The auditing process follows the standard approach for auditing. Evidence to support compliance was reviewed which included a review of monitoring data, records, specialist reports, projects, operational procedures, design reports and other relevant documentation. Thereafter a detailed site visit was undertaken to verify the status of compliance of the required site management and mitigation 173 measures as prescribed. To obtain the percentage compliance, each commitment/condition was scored from 0 to 2, and the weight/definition of these scores was as follows: • Commitments assessed to be compliant are awarded 2 points • Commitments assessed to be partially compliant are awarded 1 point and • Commitments assessed to be non-compliant are awarded 0 points • Conditions that are not applicable or recorded as noted are not awarded any points and are not considered in the calculation of the results. Summary of past environmental compliance audits Is presented in Table 66. Audits were conducted by Environmental Legal Services and an independent external auditor. Table 66: Summary of 2020 Audits for Kroondal Authorisation Date completed Name of auditor Qualification of auditor Kroondal EMPR December 2020 Anneline Dreyer • Environmental Lawyer and qualified Legal Auditor. • Legal advisor for the Government with experience in the drafting, updating and interpretation of legislation, prior to joining SABS. • Involved in the establishment of the international ISO 14001 standard in South Africa on behalf of the SABS, 1996. • Appointed as the first environmental legal auditor to the SABS’s certification body for a period of 3 years. • Private practice as a legal advisor since 1999. • Undertaken intensive legal compliance audits within the industry and mining sectors alike including the auditing of environmental authorisations (EA’s), Integrated Water Use Licences, Waste Management Licences as well as performance assessments on approved EMPr’s. She has developed and presented in - house legal courses, as well as drafted numerous legal opinions on the implications and interpretation of Legislation. Over 15 years of experience. PSA EMPR December 2020 Kroondal Water Use Licence October 2020 Ruan Dreyer • B.Sc. Environmental and Biological Sciences (Geology) from the University of the North West (Potchefstroom) • B.Sc. Honours: Environmental Management from the University of South Africa (UNISA). • SAMTRAC course at NOSA (National Occupational Safety Association Ltd) • ISO 14001:2004 Understanding and Implementation course • ISO 14001:2004 Lead Auditors course, SABS • IRCA accredited ISO 14001:2015 Lead auditors’ course, BSI • ISO 14001:2015 Understanding and Implementation course at the SABS • ISO 9001:2015 requirements course at BSI • Waste Management course at Interwaste, Hazard Identification and Risk Assessment course at HASLAC K5 (Kwezi) WUL August 2021 174 The following material risks and action plans (Table 67) have been identified from the 2020 audits conducted for the Operation: Table 67: Kroondal Material Risks and Action Plans Audit Overall Compliance Finding / Risk Action plan Environmental Audit of the PSA EMPR 84% Klipfontein Open-Pit mining was originally approved in the Kroondal Phase 4 EMPR and included in the Consolidated PSA EMPR, 2016. Following re-assessment of the mining methodology 15 years later, a few changes to the project as initially approved, are envisaged. Sibanye- Stillwater is currently in the process of identifying any changes that may require new or amended authorisations. Following the possible change of scope of the planned Klipfontein Open-Pit Mining activities as previously approved, investigate and identify if any new, or changes to, authorisations are required, including the need for amendments to the mining right MR 80, the Consolidated PSA EMPR and/or the Water Use Licence. Environmental Audit of the Kroondal EMPR 65% No approval in place for the Kroondal Phase 2 EMPR, and subsequent Kroondal Consolidated Amendment of September 2016. Obtain approval for the Kroondal Phase 2 EMPR activities, and additional amendments required, by resubmitting the EMPR to DMRE. No authorisation in place for the access road constructed through the diverted Kroondal Tributary to the K2 DMS Dump. If the access road is permanent, the IWUL needs to be amended to include the Section 21(c) and (i) activity. Determine if an EA and Section 24G in terms of the National Environmental Management Act, 1998, for the activity would also need to be conducted. The Kroondal tributary Diversion around the K2 and K150 TSF’s has not been maintained, including damage to erosion prevention measures and certain sections blocked off or no longer capable of conveying water during a flood or rain event. Ensure that the Diversion is reinstated in accordance with an approved design and if designs are updated, ensure that they are approved and included in the IWUL, EMPr and other relevant Authorisations. K6 WUL November 2021 • Over 10 years’ experience in environmental management and Auditing and specializes in Environmental Audits, Waste Management Licence audits, Water Use Licence audits, Waste Assessments and classifications, Environmental Legal Gap analysis’s, compliance monitoring to Environmental Authorisations (ROD’s) issued in terms of the National Environmental Management Act, EMPr (Mining) Compliance Auditing and implementation of SHE management systems at Diamond Mines, Coal Mines, Gold Mines, Platinum Mines, Limestone Mines, Chemical Industry, Computer Manufacturing Industry, Railway Industry, Bearing Manufacturing Industry, Glass Manufacturing Industry, Construction Industry and Clutch Manufacturing Industry
175 Audit Overall Compliance Finding / Risk Action plan Affected storm water management does not fully comply with GN 704, including the operation of surface water dams above maximum operating levels Fully implement the recommendations made in the most recent Storm Water Management Plan and Surface Water Decant Study. Inadequate freeboard management and reduced capacity of affected water systems (TSF’s and RWD’s) to cater for the 1:50 year flood event. (1) Ensure that a pool distance of 50m from the wall is maintained on all the TSF’s as required by GN R632 of 24 July 2015. (2) Ensure that the capacity of the affected water reticulation system is maintained through regular de-silting of trenches, canals, silt traps, storm water dams and other affected water dams. (3) Fully implement the recommendations made in the most recent Storm Water Management Plan and Surface Water Decant Study. (4) Continue with the planned construction of downstream containment measures at K1 Plant and investigate the practicality and feasibility of upgrading the upstream containment measures. (5) Upgrade the upstream containment measures at the Concentrator Plants. 176 Audit Overall Compliance Finding / Risk Action plan External Audit of the K5 (Kwezi) Water Use Licence 81% The following activities require authorisation under the following sections of the National Water Act, 1998: (1) Section 21 (g) for the Kwezi Shaft Waste Rock Dump. (2) Section 21 (c) and (i) for the future undermining of the Dorpspruit may be required. Follow-up on approval of the IWUL Amendment Application submitted to DHSWS on 22 June 2020. Groundwater quality varies from marginal to poor with respect to SANS drinking water guidelines, with high levels of nitrates measured in certain areas. Delineate the source/origin of pollution at Kwezi Shaft and implement remedial actions to contain pollution plume movement External Audit of the Kroondal Water Use Licence 77% No authorisation is in place for the following activities: Apply for authorisation of all water use activities not currently authorised in the Kroondal WUL during the planned IWULA. - Kopaneng Shaft two “new” oil settling dams and two additional Erickson Dams - Unauthorised crossing through Southern Kroondal Tributary Diversion - Pipeline crossing the Kroondal Tributary Diversion - New haul road crossing over the Kroondal tributary at the front and of the DMS 1 Dump - Emergency DMS Dump North of the K2 Plant No exemption in place for the K1, K150 and K2 TSF’s, K1, K150 and K2 RWD’s, DMS 1 Dump, DMS 2 Dump and K1 Dust Suppression Dam, in terms of Regulation 4 of GN 704 of 4 June 1999, Reg 4 for Apply for exemption from Reg 4 of GN 704 during the IWUL Amendment Application process. Due to non-compliance with the deposition strategy at the K2 TSF, seepage was noted at the Northern and South- eastern sides of the K2 TSF. (1) Ensure that a pool distance of 50m from the wall is maintained on all the TSFs as required by GN R632 of 24 July 2015. 177 Audit Overall Compliance Finding / Risk Action plan (2) Implement the Recommended Actions in the SRK 2019 Annual and 2020 Quarterly TSF Reports. (3) Implement remedial actions to address the seepage risks that were detected at K2 TSF. Inadequate operation and maintenance of the affected water system at the plants and shafts contribute to the capacity constraints experienced (1) Affected water dams should be operated below maximum operating levels, and in compliance with GN 704. (2) Implement effective level control mechanisms / devices. (3) Remove silt and reeds from dams, trenches, canals and silt traps to ensure adequate capacity during a 1:50 year flood event. External Audit for K6 Water Use Licence 97% All of the findings are minor and associated with the operation and maintenance of affected process water systems, namely: Ensure that dried silt / mud removed from the Mud Settling Dams is correctly disposed of. (1) Silt / mud removed from Settling Dams is left adjacent to WRD instead of being correctly disposed of as soon as it dries. (1) Ensure that dried silt/mud removed from the Mud Settling Dams is correctly disposed of as soon as it dries. (2) The Storm Water Dam (SWD) is being utilised as a process water storage facility but should be operated as empty as possible (to contain the affected storm water up to the 1:50 year flood event). (2) Operate the SWD as empty as possible, to ensure adequate capacity up to the 1:50 year flood event. (3) SWD level monitor was removed, and the control room can no longer monitor water levels in this dam to timeously inform the Shaft of potential overflow risks. (3) Re-install the level monitor at the SWD to enable the control room to monitor the SWD levels. (4) Lack of vegetation management in and around the SWD and other water channels. (4) Vegetation in and around the SWD and water channels should be maintained and removed more frequently. It should be noted that action plans are reviewed and revised, if necessary, as actions are implemented to ensure the best way forward is continually followed. Therefore, action plans may vary over time. 178 17.5.8.2 Findings Findings are discussed in terms of overall compliance with the legislation that pertains to the environment and community. Refer to Table 68 for further details. Sibanye-Stillwater confirms that Kroondal is compliant with the legal and other requirements that are applicable to its mining operations. Table 68: Kroondal Compliance to Legislation Authorisation/Approvals Legislation Date of Issue & Current Status Converted Mining Right(s) MPRDA February 2007 Environmental Management Programmes (EMPrs) MPRDA/NEMA 2016 Water Permit 1956 Water Act N/A Water Use Licences (WULs) NWA 2018 Atmospheric Emissions Licences (AELs) NEM: AQA Not applicable Waste Management Licences (WMLs) NEM: WMA 2012 NEMA Environmental Authorisations (where applicable) NEMA The Phase 2 EMPr are not yet approved but were in the process to get it approved It should be noted that action plans are reviewed and revised, if necessary, as actions are implemented to ensure the best way forward is continually followed. Therefore, action plans may vary over time. Compliance is evaluated against relevant legal and other requirements, including environmental authorisations/approvals. Findings are discussed in terms of overall compliance with the legislation that pertains to the environment and community.
179 17.5.8.3 Future Actions Table 69 shows the future actions and projects for the Kroondal Operations. Table 69: Future Actions Project Description Due Date Status Hydrogeological Assessments March 2022 Complete Wetland delineation studies November 2022 In Progress Desilting and re-lining of K1 and K2 Concentrator storm water dams December 2021 Complete Implementation of 5-year dust management plan for Kroondal Haul roads and Kroondal K150 and K2 Tailings Dams Project Commenced in October 2020. • Year 1 – Complete 2020/2021 • Year 2 – 2022 • Year 3 – 2023 • Year 4 – 2024 • Year 5 – 2025 Drilling of scavenger wells for management of ground water contamination and use of water within the operations to supplement purchased potable water. November 2023 In Progress Tailings Dam Break Analysis Assessments in order to comply with GISTM Standard Requirements August 2023 In Progress Implementation of K2Fly in order to gather environmental and data to support compliance to the GISTM Standard Requirements August 2023 In Progress EMPR consolidation and amendment Submitted in March 2022, awaiting feedback / approval from DMRE In Progress Water Use Licence amendment December 2023 In Progress 17.5.9 Closure Planning and Costs 17.5.9.1 Decommissioning and Closure Liabilities The Operations are committed to on-going closure planning. Scheduled and unscheduled mine closure costs are reviewed and updated annually for financial reporting and regulatory compliance. The National Environmental Management Act (NEMA), pertains to the financial provision for prospecting, exploration and mining and requires that a final rehabilitation, decommission and mine closure plan is developed which includes the determination of financial provision to guarantee the availability of sufficient funds to undertake rehabilitation and remediation of the adverse environmental impacts of mining. An amendment to GNR 1147 ( Regulations for Financial Provision for Prospecting, Exploration, Mining and Production Operations,2015) in October 2016, extended the Transitional 180 Arrangements to February 2019 (which was subsequently further extended to February 2020 and again to June 2022). The alignment of these plans and documents to the 2015 FP Regulations is ongoing. Compliance with the Financial Provisioning Regulations is required within three months from the first financial year-end following June 2022, which is the new promulgated compliance date for the amended FP Regulations. Therefore Sibanye-Stillwater Marikana Operations is required to be compliant by March 2023. In order to ensure that all aspects potentially applicable during the closing of a facility is considered during the quantum assessment, a standard checklist have been provided by the guidelines which was used in compilation of this plan. It is however recognized that all the items will not always be applicable for all the areas, but it was considered in any event to make sure that all possible issues were addressed and assessed. Closure Components to be considered during the Quantum Assessment are given in Table 70. In addition, Long Term Care and Maintenance plans as well as Future Monitoring programmes will be established as part of the Closure Plans. Table 70: Closure Components Component No. Description 1 Infrastructural Areas 1.1 Dismantling of processing plant and related structures (including overland conveyers and powerlines) 1.2 Demolition of steel buildings and structures 1.3 Demolition of other buildings and structures 1.4 Rehabilitation of roads and paved surfaces 1.5 Demolition and rehabilitation of railway lines 1.6 Other linear infrastructure 1.7 Disposal of demolition waste 1.8 Making good of infrastructure 2 Mining Areas 2.1 Open-pit rehabilitation, including final voids and ramps 2.2. Sealing of shafts, adits and inclines 2.3 Rehabilitation of stockpiles and processing residues 2.4 Rehabilitation of clean water impoundments 2.5 Rehabilitation of dirty water impoundments 3 General surface rehabilitation 3.1 Infrastructural areas 3.2 Other surface disturbances 4 Runoff Management 4.1 River diversions and watercourse reinstatement 181 Component No. Description 4.2 Reinstatement of drainage lines 5 P&Gs, Contingencies and additional allowances 6 Pre-site relinquishment monitoring and aftercare 17.5.9.2 Life of MIne Planning and Closure Given the long Life of the Mines, final closure plans have not been fully developed. As the shafts are closed plans are developed near the time of the closure depending on the local environmental and community situations. The closure objective for the operations including how the objective will align with the current baseline environment includes the following: • Gently undulating topography, interspersed with small hills. • Pre-mining soils which supported arable, grazing and wilderness land capabilities and/or uses. Closure objectives around land capability and use must be informed by consensus with relevant stakeholders. • A functioning ecosystem. • Non-perennial drainage patterns. • Moderate groundwater quality (considered not suitable for Domestic Use in terms of the South African Water Quality Guidelines). • Water table which was unable to provide groundwater as a water supply source. • Quite rural environment. 17.5.9.3 Unscheduled Closure Cost Estimate Kroondal total closure liability and associated financial provision is based on unplanned closure, with specific costs allocated to the demolition of mining and associated infrastructure, the rehabilitation of mine-impacted land and post-closure monitoring and maintenance. The mechanisms and methods of the demolition, remediation and rehabilitation processes are described in rehabilitation and final closure plans. However, as far as possible, Kroondal will embark on a concurrent rehabilitation programme during the operational phase of the mine. This programme will be completed irrespective of unplanned closure and/or continued operations. A closure cost estimate for an unscheduled closure at the Kroondal Operations is updated annually, in line with the International Financial Reporting Standards (“IFRS”) of the International Accounting Standards Board and South African Statements of Generally Accepted Accounting Practice as well as applicable environmental legislation (MPRDA and NEMA) and in accordance with the Draft GN1147. The closure cost assessment included an update and escalation of the unit rates applied in the FY 2020 update, and the inclusion of additional construction and removal of existing infrastructure since the previous closure cost update. The base rates applied in the closure cost assessment were determined 182 as at March 2021. The 2021 unit rates remained largely unchanged from the 2020 rates, and similar to 2019, primarily due to COVID-19 restrictions and the resultant impacts on escalations. The updated closure cost estimates for unscheduled closure as at 31 December 2021 amount to ZAR 284 million for the Kroondal Operations, excluding the Marikana Section. No financial discounting has been applied. The 2021 closure liability of ZAR284 million will be funded through a combination of cash in trust funds as well as third party financial guarantees. The detailed breakdown of the 2021 unscheduled closure estimate is as follows: • Infrastructural and mining aspects – ZAR 226,724,724 (80%) • Pre-site Relinquishment Monitoring & Aftercare – ZAR 6,565,278 (2%) • Combined Preliminary & General and Contingencies – ZAR 31,315,304 (11%) • Additional studies & allowances – ZAR 19,220,828 (7%) Marikana(Kroondal) Section has its own mining right and therefore its own closure liability. The 2021 Marikana section closure liability of ZAR1,113.6 million is funded through financial guarantees. A detailed breakdown for the closure liability is as follows: • Infrastructural and mining aspects – ZAR 962,831,483 (86%) • Pre-site Relinquishment Monitoring & Aftercare – ZAR 12,646,433 (1%) • Combined Preliminary & General and Contingencies – ZAR 130,273,788 (12%) • Additional studies & allowances – ZAR 7,820,550 (1%) 17.6 QP Opinion The QP is satisfied that all material issues relating to Environmental, Social and Governance have been addressed in this document. 18 Capital and Operating Costs 18.1 Overview 18.2 Capital Expenditure Capital expenditure on Table 71 for Kroondal includes sustaining capital. Ongoing capital expenditure estimates are based on a provision of an approximate 4% of operating cost expenditures for shallow mines, this percentage is based on historical spend, and the current business plan generally are included for the first year of the LoM plan. These amounts cater for expenditures of a capital nature and are considered prudent provisions (contingencies) to maintain the operations infrastructure, given that limited detail is provided beyond the current three-year horizon.
183 Table 71: Historical and Forecast Capital Expenditure Historical Real Forecast Units C2019 C2020 C2021 LoM C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 C2030 C2031 C2032- 2036 Total 1 2 3 4 5 6 7 8 9 10 11-15 Sustaining Capital (ZARm) 426 376 536 1 445 602 142 119 104 78 53 55 55 55 54 129 184 18.3 Operating Costs This section provides details on the forecast operating cost estimates for Kroondal. 18.3.1 Operating Costs by Activity Table 72 provides details of historical and forecasted Operating Costs by activity grouped according to: • Mining costs–underground mining costs and surface sources costs, including ore handling costs • Processing costs, including tailings and waste disposal costs and • The cost of maintaining key on mine infrastructure. In addition, Kroondal has incorporated costs for environmental rehabilitation and closure and costs associated with terminal benefits, which will be payable on cessation of mining activities. No salvage values have been assumed for plants and equipment. The Operating cost are based on the current year’s operational business plan and projected forward using the required production profile taking into account the likely physical changes in the operating parameters over the full period of the LoM plan. 18.3.2 Operating Cost The operating cost for Kroondal for the Mineral Reserves estimation used in the LoM plan is ZAR1,104/t. The actual operating cost for 2021 was ZAR 896/t for underground and surface combined. The five-year forecast average is ZAR1,035/t. 18.3.3 Surface Sources Costs No rock dumps or tailings dams are included in this declaration. 18.3.4 Processing Costs The treatment cost for 2022 is estimated at ZAR133/t for underground material. For LoM, the expected unit costs increase as the production plan decreases. The average over the next five years is ZAR146/tonne. 18.3.5 Allocated Costs Allocated costs have been forecast at an average of ZAR 783 million per annum for the next five years. These costs include costs for Rehabilitation, Royalties, Retrenchment cost, Engineering, Occupational Environment and Hygiene, Environmental Management, Health and Safety, and other typical centralised costs. 185 Table 72: Historical and Forecast Operating Costs Historical Real Forecast Units 2019 2020 2021 LoM 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032- 2036 2037 Total 1 2 3 4 5 6 7 8 9 10 11 12 Operating Cost (ZARm) 5,757 5,291 6,316 47,479 6,333 5,645 5,657 5,587 5,205 3,835 2,371 1,545 1,542 1,517 6,907 1,336 Tonnes Milled (Kt) 8,120 5,994 7,050 42,989 6,337 5,584 5,513 5,372 4,670 3,534 1,838 1,272 1,269 1,242 5,474 885 Operating Cost (ZAR/t) 709 883 896 1,104 999 1,011 1,026 1,040 1,115 1,085 1,290 1,215 1,215 1,222 1,262 1,509 186 19 Economic Analysis 19.1 Introduction The following Section presents a discussion and comment on the economic assessment of Kroondal. Specific comment is included on the methodology used to generate the financial models for Kroondal to establish a base case, including the basis of the techno-economic model, modelling techniques and evaluation results. 19.2 Economic Analysis Approach Kroondal can be classified as a Production Property as it has a significant, detailed cost and capital information specific to the geographic and economic locality of its assets. The cash-flow approach is the most appropriate method to use for economic analysis. 19.3 Economic Analysis Basis The assumptions on which the economic analysis is based include: • All assumptions are on 31 December 2021 money terms, which is consistent with the Mineral Reserve declaration date • Royalties on revenue are consistent with relevant South African legislation (0.5 – 9% based on the formula) (refer to Table 73) • Corporate taxes that can be offset against assessed losses and capital expenditure (refer to Table 73) • A Real base case Discount Rate of 5% and Discounted cash-flow (DCF) techniques applied to post-tax pre-finance cash flows. Sensitivity analysis was performed to ascertain the effect of discount factors, product prices, total cash costs and capital expenditures. The post-tax pre-finance cash flows presented for the mining asset incorporate macroeconomic projections as set put in Table 74 and
187 • Table 75. • The Technical – Economic Model is presented in real terms are based on annual cash-flow projections determined at the end-point 31 December. 19.4 TEM Parameters Table 73 provides details of the parameters applied in the Technical – Economic Model. Table 73: Technical – Economic Model Parameters Parameter Units Historical Corporate Tax Rate (%) 27% Royalties (based on the formula) (%) 0.5% - 12.5% Trading Terms Debtors (Days) 3 Creditors (Days) 45 Stores (Days) 45 Balance at 31 December 2020 Debtors (ZARm) 263 Creditors (ZARm) 663 Stores - opening balances (ZARm) Unredeemed Capital - 31 December (ZARm) Environmental Closure Liability – 31December (ZARm) 609 Terminal Benefits Liability based on LoM (ZARm) 481 Assessed Losses (Years) N/A The following working capital parameters have been applied in the model: Debtors – 3 days; Creditors – 45 days; and Stores – 45 days. Sibanye-Stillwater has indicated that the balances for working capital will be settled at the effective date of the Mineral Reserve declaration, and as such the opening balances have been set to zero. The corporate tax rate applied is based on a formula that uses capital expenditure and assessed tax losses. Royalties are calculated using the formula for refined metals [Royalty Payable = 0.5+ (EBIT/Gross Sales)/9]. 19.5 Technical Economic Model The technical inputs used to determine the financial parameters for the TEMs are provided in Table 74 to and Table 77 as well as an assessment of the financial parameters on a unit cost basis: ZAR/4Eoz. 188 Table 74: TEM – Mining, Processing, PGM’s Sold and Revenue, Cash Costs, Taxation, Capital Expenditure and Free Cash - 2022-2031 LoM C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 C2030 C2031 Units Total 1 2 3 4 5 6 7 8 9 10 Underground Mining Development (m) 33,245 9,393 8,529 7,578 3,787 2,325 1,156 477 0 0 0 ROM** (kt) 41,322 5,757 4,983 5,072 5,327 4,670 3,534 1,838 1,272 1,269 1,242 Head Grade (g/t) 2.52 2.42 2.45 2.50 2.50 2.48 2.53 2.57 2.61 2.67 2.60 Recoveries (%) 83.2% 82.7% 82.8% 82.8% 83.0% 83.0% 83.3% 83.4% 83.8% 84.1% 83.7% PGM Ounces (4E0z'000) 2,791 371 325 337 355 309 239 127 89 92 87 Recovered Grade (g/t) 2.10 2.00 2.03 2.07 2.07 2.06 2.10 2.14 2.18 2.24 2.17 Surface ROM (kt) 1,667 580 601 441 45 0 0 0 0 0 0 Head Grade (g/t) 3.27 2.98 3.04 3.92 3.86 0.00 0 0 0 0 0 Recoveries (%) 70.6% 67.7% 68.3% 75.4% 75.1% 0.0% 0 0 0 0 0 PGM Ounces (4E0z'000) 124 38 40 42 4 0 0 0 0 0 0 Recovered Grade (g/t) 2.31 2.02 2.08 2.96 2.90 0.00 0.00 0.00 0.00 0.00 0.00 Processing Ore Processing (kt) 42,989 6,337 5,584 5,513 5,372 4,670 3,534 1,838 1,272 1,269 1,242 Head Grade (g/t) 2.55 2.47 2.51 2.61 2.51 2.48 2.53 2.57 2.61 2.67 2.60 Recoveries (%) 82.6% 81.1% 80.9% 82.0% 82.9% 83.0% 83.3% 83.4% 83.8% 84.1% 83.7% Recovered Grade (g/t) 2.11 200.4% 203.4% 213.9% 208.1% 205.6% 210.3% 214.3% 218.3% 224.3% 217.4% PGM Produced (4Eoz) 2,914 408 365 379 359 309 239 127 89 92 87 Basket Price Basket Price (R/4Eoz) 29,746 30,094 29,913 29,714 29,920 29,907 30,013 29,844 29,853 29,731 29,487 189 LoM C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 C2030 C2031 Units Total 1 2 3 4 5 6 7 8 9 10 Revenue 4E Revenue (ZARm) 72,407 10,264 9,122 9,408 8,980 7,712 5,989 3,156 2,226 2,273 2,137 Other Metals (ZARm) 3,419 494 431 441 421 358 272 145 105 108 102 Base Metals (ZARm) 2,327 321 273 280 300 259 225 112 70 70 68 Revenue from sales of mining products (ZARm) 78,153 11,079 9,826 10,129 9,701 8,329 6,486 3,414 2,401 2,451 2,307 Operating Cost Direct Operations Cost (ZARm) 46,986 6,333 5,645 5,656 5,587 5,062 3,725 2,284 1,542 1,542 1,517 RBN Royalties (ZARm) 0 0 0 0 0 0 0 0 0 0 0 Terminal benefits costs (ZARm) 481 0 0 0 0 143 109 85 0 0 0 Environmental closure cost (ZARm) 12 0 0 0 0 0 1 2 3 0 0 Royalty payable (ZARm) 391 55 49 51 49 42 32 17 12 12 12 Recurring pre-tax income from continuing operations (EBITDA) (ZARm) 30,283 4,691 4,132 4,422 4,065 3,082 2,618 1,026 844 897 778 Taxation (ZARm) 7,788 1,104 1,077 1,162 1,070 811 693 262 213 227 196 Net Income from continuing operations (ZARm) 22,496 3,587 3,055 3,260 2,996 2,271 1,926 763 631 670 583 Capital Expenditure (ZARm) 1,445 602 142 119 104 78 53 55 55 55 54 Net Free cash (ZARm) 21,051 2,985 2,913 3,141 2,892 2,193 1,872 709 576 615 529 **ROM includes tonnage from Rustenburg Mine accessed through the Kroondal infrastructure see Section 21 for more information. 190 Table 75: TEM – Mining, Processing, PGM’s Sold and Revenue, Cash Costs, Taxation, Capital Expenditure and Free Cash - 2032-2037 LoM C2032 - C2036 C2037 - C2041 Units Total 11 - 15 16 - 20 Underground Mining Development (m) 33,245 0 0 ROM (kt) 41,322 5,474 885 Head Grade (g/t) 2.52 2.67 2.69 Recoveries (%) 83.2% 84.2% 84.2% PGM Ounces (4E0z'000) 2,791 396 64 Recovered Grade (g/t) 2.10 2.25 2.26 Surface ROM (kt) 1,667 0 0 Head Grade (g/t) 3.45 0 0 Recoveries (%) 67.0% 0 0 PGM Ounces (4E0z'000) 124 0 0 Recovered Grade (g/t) 2.31 0.00 0.00 Processing Ore Processing (kt) 42,989 5,474 885 Head Grade (g/t) 2.56 2.67 2.69 Recoveries (%) 82.4% 84.2% 84.2% Recovered Grade (g/t) 2.11 225.2% 226.2% PGM Produced (4Eoz) 2,914 396 64 Basket Price Basket Price (R/4Eoz) 29,746 29,114 27,975
191 LoM C2032 - C2036 C2037 - C2041 Units Total 11 - 15 16 - 20 Revenue 4E Revenue (ZARm) 72,407 9,635 1,504 Other Metals (ZARm) 3,419 467 76 Base Metals (ZARm) 2,327 301 49 Revenue from sales of mining products (ZARm) 78,153 10,402 1,629 Operating Cost Direct Operations Cost (ZARm) 46,986 6,907 1,186 RBN Royalties (ZARm) 0 0 0 Terminal benefits costs (ZARm) 481 0 144 Environmental closure cost (ZARm) 12 0 5 Royalty payable (ZARm) 391 52 8 Recurring pre-tax income from continuing operations (EBITDA) (ZARm) 30,283 3,443 285 Taxation (ZARm) 7,788 895 78 Net Income from continuing operations (ZARm) 22,496 2,548 206 Capital Expenditure (ZARm) 1,445 129 0 Net Free cash (ZARm) 21,051 2,420 206 192 Table 76: TEM – Unit Analysis (ZAR/4Eoz) – 2022-2031 LoM C2022 C2023 C2024 C2025 C2026 C2027 C2028 C2029 C2030 C2031 Units Total 1 2 3 4 5 6 7 8 9 10 Basket Price Basket Price (R/4Eoz) 29,746 30,094 29,913 29,714 29,920 29,907 30,013 29,844 29,853 29,731 29,487 Revenue 4E Revenue (R/4Eoz) 24,844 25,134 24,984 24,817 24,989 24,979 25,067 24,926 24,933 24,831 24,628 Other Metals (R/4Eoz) 1,173 1,209 1,179 1,164 1,171 1,159 1,137 1,149 1,177 1,177 1,177 Base Metals (R/4Eoz) 799 787 748 738 835 837 940 885 783 763 787 Revenue from sales of mining products (R/4Eoz) 26,816 27,130 26,912 26,719 26,995 26,975 27,144 26,960 26,894 26,771 26,592 Operating Cost Direct Operations Cost (R/4Eoz) 16,122 15,507 15,460 14,920 15,546 16,396 15,589 18,035 17,277 16,838 17,486 RBN Royalties (R/4Eoz) 0 0 0 0 0 0 0 0 0 0 0 Terminal benefits costs (R/4Eoz) 165 0 0 0 1 463 455 673 0 0 0 Environmental closure cost (R/4Eoz) 4 0 0 0 0 0 6 18 30 0 0 Royalty payable (R/4Eoz) 134 136 135 134 135 135 136 135 134 134 133 Recurring pre-tax income from continuing operations (EBITDA) (R/4Eoz) 10,391 11,487 11,317 11,665 11,313 9,982 10,958 8,099 9,452 9,799 8,973 Taxation (R/4Eoz) 2,672 2,704 2,951 3,065 2,976 2,627 2,898 2,070 2,386 2,484 2,255 Net Income from continuing operations (R/4Eoz) 7,719 8,783 8,366 8,600 8,336 7,355 8,060 6,029 7,066 7,315 6,718 Capital Expenditure (R/4Eoz) 496 1,473 388 313 289 253 223 432 616 599 622 Net Free cash (R/4Eoz) 7,223 7,310 7,978 8,286 8,047 7,102 7,836 5,597 6,451 6,716 6,096 193 Table 77: TEM – Unit Analysis (ZAR/4Eoz) – 2032-2051 LoM C2032 - C2036 C2037 - C2037 Units Total 11 - 15 16 - 20 Basket Price Basket Price (R/4Eoz) 29,746 29,114 27,975 Revenue 4E Revenue (R/4Eoz) 24,844 24,316 23,365 Other Metals (R/4Eoz) 1,173 1,177 1,177 Base Metals (R/4Eoz) 799 760 756 Revenue from sales of mining products (R/4Eoz) 26,816 26,253 25,299 Operating Cost Direct Operations Cost (R/4Eoz) 16,122 17,432 18,428 RBN Royalties (R/4Eoz) 0 0 0 Terminal benefits costs (R/4Eoz) 165 0 2,240 Environmental closure cost (R/4Eoz) 4 0 83 Royalty payable (R/4Eoz) 134 131 126 Recurring pre-tax income from continuing operations (EBITDA) (R/4Eoz) 10,391 8,690 4,421 Taxation (R/4Eoz) 2,672 2,259 1,216 Net Income from continuing operations (R/4Eoz) 7,719 6,432 3,205 Capital Expenditure (R/4Eoz) 496 324 0 Net Free cash (R/4Eoz) 7,223 6,107 3,205 194 19.6 DCF Analysis The following NPV sensitivities are included in this Section: NPV’s at a range of discount factors in relation to the Discount Rate of 5% (Real) [Refer Table 78]. A range of discount factors from 0% to 10% with their associated NPVs are presented for each case. From Table 79, Kroondal at different discount factors and the sensitivity to the discount factor can be evaluated. Twin parameter sensitivities are presented evaluating Revenue against Operating Costs. NPV’s at higher product price levels are shown up to a 20% increase in price, which captures any upside potential. Since markets are inherently volatile, the downside risk is reflected in the 20% decrease in price in increments. The achievability of LoM plans, budgets and forecasts cannot be assured as they are based on economic assumptions, many of which are beyond the control of Kroondal. Future cash flows and profits derived from such forecasts are inherently uncertain and actual results may be significantly more or less favourable. It is for this reason that the Kroondal Operations presents sensitivities for Operating Costs, ranging from -20% to +20%. The most optimistic analysis, which assumes prices have been under- estimated by 20% and Operating Costs over-estimated by 20%, yields an NPV in the top right-hand corner of Table 79. Conversely, the most pessimistic analysis, which assumes prices have been over- estimated by 20% and Operating Costs under-estimated by 20%, yields an NPV in the bottom left-hand corner of Table 79. NPV sensitivity to sales revenue and capital expenditure derived from twin parameter sensitivities at the Discount Rate of 5% (Real) (Refer to Table 80). Twin parameter sensitivities are presented evaluating Revenue against capital expenditure costs. Capital expenditures are estimates until contracts, which specify the deliverable, are signed by clients. It is for this reason that Kroondal presents sensitivities for capital costs from -20% to +20%. The most optimistic analysis, which assumes prices have been under- estimated by 20% and capital expenditure costs over-estimated by 20%, yields an NPV in the top right- hand corner of Table 80. Conversely, the most pessimistic analysis, which assumes prices have been over-estimated by 20% and capital expenditure costs under-estimated by 20%, yields an NPV in the bottom left-hand corner of Table 80. Table 78: NPV (Post-tax) at Various Discount Factors Discount Factor (%) NPV (ZARm) 0.00% 21,051 2.00% 19,479 5.00% 17,543 7.00% 16,472 10.00% 15,119
195 Table 79: Twin Parameter NPV (pre-tax) Sensitivity at a 5% Discount Rate (Revenue, Operating Costs) Post-Tax NPV@5% Revenue Sensitivity Range (ZARm) -20% -10% -5% 0% 5% 10% 20% Total operating cost sensitivity range -20% 12,483 18,881 22,081 25,280 28,479 31,678 38,077 -10% 8,615 15,013 18,212 21,411 24,611 27,810 34,208 -5% 6,680 13,079 16,278 19,477 22,676 25,876 32,274 0% 4,746 11,145 14,344 17,543 20,742 23,941 30,340 5% 2,812 9,210 12,409 15,609 18,808 22,007 28,406 10% 878 7,276 10,475 13,674 16,874 20,073 26,471 20% (2,991) 3,408 6,607 9,806 13,005 16,204 22,603 Table 80: Twin Parameter NPV (Pre-tax) Sensitivity at a 5% Discount Rate (Revenue, Capital Expenditure) Post-Tax NPV@5% Revenue Sensitivity Range (ZARm) -20% -10% -5% 0% 5% 10% 20% Capital cost sensitivity range -20% 4,999 11,398 14,597 17,796 20,996 24,195 30,593 -10% 4,873 11,271 14,470 17,670 20,869 24,068 30,466 -5% 4,809 11,208 14,407 17,606 20,806 24,005 30,403 0% 4,746 11,145 14,344 17,543 20,742 23,941 30,340 5% 4,683 11,081 14,280 17,480 20,679 23,878 30,276 10% 4,619 11,018 14,217 17,416 20,615 23,815 30,213 20% 4,493 10,891 14,090 17,290 20,489 23,688 30,086 19.7 Summary Economic Analysis The summary economic analysis of Kroondal is based on the Cash-Flow Approach. There is no other appropriate method of analysis for this operation. The summary economic evaluation for Kroondal is based on the current business plan of the operation and excludes any impact of Secondary Taxation on Companies and adverse international or local events, impact of that risk is illustrated in Table 79 and Table 80 indicating sensitivity impact as a result of fluctuations in operating cost, capital and metal price sensitivities. The economic model has been undertaken to support the declaration of Mineral Reserves. Refer to Table 81. Table 81: NPV (Post-tax) Relative to ZAR/4Eoz Basket Price at a 5% Discount Rate Long Term Price (R/4Eoz) Revenue Sensitivity Range -20% -10% -5% 29,746 5% 10% 20% NPV@ Base case discount Rate 4,746 11,145 14,344 17,543 20,742 23,941 30,340 196 19.8 QP Opinion The QP is satisfied that the economic analysis fairly represents the financial status of the operation as at 31 December 2021. 20 Adjacent Properties Kroondal is part of the Western Limb of the Bushveld Complex. Positions of these mines are shown in Figure 2. Below is a list of adjacent mines/operations. Table 82 gives the mine, owner, commodities mined and link to the Company websites. For current information on these properties, the reader should refer to the official websites. Mineralization on the adjacent properties is continuous across all properties however, variations across the deposit occurs and the quantum and grade of the mineralization at these mines may not be indicative of the same at Kroondal. The Kroondal and Rustenburg Mines are a single orebody with shared services and infrastructure. Data from the Rustenburg Operations has been used in the estimation of Mineral Resource and some operations information has been shared in the estimation of the Mineral Reserves. Refer to Section 21 for details information. Rustenburg and Marikana are owned and operated by the Registrant. There are shared services between these operations and the Kroondal Operations. The QPs for these mines are the same as for the Kroondal Operations. The QP’s have verified the information in the public sources. The Glencore Mine is owned by a 3rd party and the QPs have not verified the information in the public sources. Table 82: Adjacent Mines/Operations Mine name Owners Commodities Source of info Kroondal Mine Glencore Chrome https://www.glencore.com/ *Rustenburg Operations Sibanye-Stillwater PGM https://www.sibanyestillwater.com/ *Marikana Operations Sibanye -Stillwater PGM https://www.sibanyestillwater.com/ 21 Other Relevant Data and Information 21.1 Risk Analysis 21.1.1 Financial Assessment Accuracy Table 83 provides details of accuracy limits in the major financial categories. Kroondal does not directly report contingencies for Operating costs but rather provides for this as part of sustaining capital at 4% of Operating cost. There are no new capital projects and no assessed capital risks. 197 Table 83: Financial Assessment Accuracy Risks Mitigation Measures Price Risk (Mineral Reserve Risk) - Revenue -assessed the prices using various sensitivities (-10% to +10%) - the forecast price considered multiple scenarios Economic Viability Risk (Mineral Reserve Risk) - Operating Costs -assessed the Operating Costs using various sensitivities (-20% to +20%) Economic Viability Risk (Mineral Reserve Risk) - Capital Expenditure -assessed the Capital Expenditure based on 4% of operating costs for sustaining capital and technical studies for new projects (-20% to +20%) 21.1.2 Risk to the Mineral Resources and Mineral Reserves As part of the annual operational planning process, the Rustenburg Operations management team assessed all the major risks that impact the execution of the plan. Sibanye-Stillwater maintains a risk register at the corporate level detailing all significant risks that may impact the operations. The Risk register is updated quarterly. Risks are listed by the source of the risk, the type of operational risk. Risks are assessed for likelihood of occurrence and severity for inherent risks to assess the unmitigated impact on the operations. The risk is reassessed once reasonable mitigation plans have been applied to give a residual risk using the same scale as for inherent risk. The following major risks have been identified. 21.1.2.1 Mineral Resources There are no deemed material risks to the Mineral Resource Estimate. 21.1.2.2 Mineral Reserves The key operational risks that could impact the Mineral Reserves are listed below. Commodity prices and exchange rate assumptions Sibanye-Stillwater has adopted forward-looking price assumptions. Any material deviations from these assumptions could impact the Mineral Reserves, especially at marginal operations. The QPs are of the view that these prices applied to our LoM valuations are realistic considering the external guidance received. ESG and social unrest The SA PGM operations are situated in close proximity to large communities with high unemployment rates and low incomes. As such, it is continually at risk to social unrest events. From a social and governance perspective, the Group has implemented appropriate objectives and initiates to address this risk. From an environmental perspective, the area experiences significant pressure on potable and 198 fresh water supply. The adoption of the PGM water stewardship, GHG and footprint reduction during 2022 will enable these operations to meet the requirements defined by our ESG commitments. Cost escalation Cost escalation assumptions relating to factors such as wages, utilities like electricity and operational consumables (explosives and steel) are aligned with Group estimates. Continuous improvement initiatives adopted to contain cost escalation are in place to mitigate this risk. Operational Risk Operational underperformance and slower than planned production build-up at projects may result in variations between planned and achieved production rates. Short interval controls are in place to enable the implementation of timeous interventions and, therefore, correction of deviations to plans. 21.2 Rustenburg and Kroondal Shared Mining Services Mineral Resources and Mineral Reserves at the Rustenburg Operations (SRPM) are declared within the NW82MR, whilst for the Kroondal Operations, Resources and Reserves are declared within the NW80MR. These mining rights are held by the different legal entities of SRPM and Anglo American Platinum respectively. In order to accurately declare Resources and Reserves in line with regulatory requirements and existing mining right boundaries, the Reserves mined at SRPM (within NW82MR) yet accessed through Kroondal infrastructure (by means of deepening decline shafts) are declared at SRPM. The Business Plan 22 LoM of the Kroondal Operations is based on the full extraction of Reserve Tonnes and Oz from both the NW80MR and NW82MR for costing and processing purposes. Since the LoM valuation is determined on 100% of the production plan, there is inevitably a difference between what is determined in the LoM and the Mineral Reserves declared for the relevant right holder. This approach results in a misalignment between the Tonnes and Oz reflected in the Reserve Statement and the BP22 LoM Tonnes and Oz for both SRPM and Kroondal. Individually Tonnes and Oz do not balance between Reserves (31 Dec 2021) and BP22 LoM, however when combined there is full and complete alignment in the numbers( Table 84). Table 84: Kroondal - Rustenburg Reserves and LOM Balance Mine Mineral Reserve* Tonnes (million) Mineral Reserve *Metal (4E MOzt) LOM Tonnes(Millions) LOM Metal (MOzt) Kroondal 20.8 1.7 41.3 3.528 Rustenburg 169.1 15.5 146.9 13.65 Total 189.1** 17.2 188.2** 17.2 *Proved and Probable Reserves, *Differences du to rounding errors 22 Interpretation and Conclusions In considering the valuation as derived herein, a critical factor is the assumption regarding the future projection is the South African Rand exchange rate against the USD. The views expressed in this Technical Report Summary have been based on the fundamental assumption that the required
199 management resources and proactive management skills will be focused on meeting the LoM plans and production targets provided by Kroondal Operations and Projects. The Kroondal Operations has conducted a comprehensive review and assessment of all material issues likely to influence future operations based on information available up to 31 December 2020. 23 Recommendations There are no recommendations for additional work or changes. 24 Qualified Persons’ Consents We, the signees, in our capacity as Qualified Persons pursuant to Subpart 1300 of Regulation S-K of the US Securities Act of 1933 (SK-1300), each hereby consent to: • the public filing and use by Sibanye-Stillwater of the Technical Report Summaries for which I am responsible; • the use and reference to my name, including my status as an expert or “Qualified Person” (as defined by SK-1300) in connection with the Technical Report Summaries for which I am responsible; • the use of any extracts from, information derived from or summary of the Technical Report Summaries for which I am responsible in the annual report of Sibanye-Stillwater on Form 20-F for the year ended 31 December 2021 (Form 20-F); and • the incorporation by reference of the above items as included in the Form 20-F into Sibanye- Stillwater’s registration statement on Form F-3 (File No. 333-234096) (and any amendments or supplements thereto). I am responsible for overseeing, and this consent pertains to, the Technical Report Summaries for which my name appears below and certify that I have read the Form 20-F and that it fairly and accurately represents the information in the Technical Report Summaries for which I am responsible. Property Name QP Name Affiliation to registrant Field or area of responsibility Signature SA PGM Kroondal Operations Andrew Brown Full time employee Lead /s/ Andrew Brown Manie Keyser Full time employee Resources, Reserves, Mine Planning /s/ Manie Keyser Brian Smith Full time employee Mineral Reserves /s/ Brian Smith Nicole Wansbury Full time employee Mineral Resources /s/ Nicole Wansbury Stephan Botes Full time employee Surface and Mineral Rights /s/ Stephan Botes 200 Mandy Jubileus Full time employee Environmental Compliance /s/ Mandy Jubileus Dewald Cloete Full time employee Mineral Processing /s/ Dewald Cloete Roderick Mugovhani Full time employee Financial Evaluation /s/ Roderick Mugovhani 25 References 25.1 List of Reports and Sources of Information 25.1.1 Publications and Reports Arnot, N., and Stobart, B., 2016, Consolidated Environmental Impact Assessment and Environmental Management Programme for the Kroondal Platinum Mine for Aquarius Platinum (South Africa), SLR Consulting (Africa), unpubl, 2016. Ballhaus, C.G. 1988. Potholes of the Merensky Reef at Brakspruit Shaft, Rustenburg Platinum Mines: Primary disturbances in the magmatic stratigraphy. Economic Geology, vol. 83. p. 1140-1158. Beukes, J.P and van Zyl, P.G., 2017. Review of Atmospheric SO2 Data Collected with Passive Sampling and Regional Perspective, Atmospheric Chemistry Research Group, North West University, p. 27. Brown, A., Keyser, H., Wansbury, N., Changara, L., Smith, B., 2020, Technical Report Summary of the Materials Assets of the Kroondal Operations Situated near Rustenburg, North West Province, South Africa. Sibanye Stillwater, unpubl, p. 201 Brown, A., Smith, B., Ross, H., Changara, L., Mugovhani, R., and Gewers, N., 2019, Competent Person’s Report on the Material Asset of the Kroondal Operations including Mimosa and RSA PGM Projects Situated near Rustenburg, Northwest, South Africa, Sibanye Stillwater, Platinum Division, Mine Technical Services Team, unpubl, p. 231 Carr, H.W., Groves, D.I., and Cawthorn, R.G. 1994. The Importance of synmagmatic deformation in the formation of Merensky Reef potholes in the Bushveld Complex. Economic Geology, vol. 89. p. 1398- 1410. Cawthorn, R.G., Eales, H.V., Walraven, F., Uken, R. and Watkeys, M.K., 2006. The Bushveld Complex. In: Geology of South Africa. Edited by M.R. Johnson, C.R. Anhaeusser and R.J. Thomas. Geological Society of South Africa. 261-281. Cowley, A., Bloxham, L., Brown, S., Cole, L., Fujita, M., Girardot, N., Jiang, J., Raithatha, R., Ryan, M., Shao, E., Tang, B., Wang, A., Xiaoyan, F., 2021. The Pgm market report, Johnson-Matthey,. https://matthey.com/en/news/2021/pgm-market-report-february-2021 Cawthorn, R.G., (2010). The Platinum Group Element Deposits of the Bushveld Complex in South Africa, Platinum Metals Rev., 2010, 54, (4) 205doi:10.1595/147106710x520222. https://www.technology.matthey.com/article/54/4/205-215/#B1 201 Crowson, P.,(2001) “Minerals Handbook 2000–01: Statistics and Analyses of the World's Minerals Industry”, Mining Journal Books Ltd, Edenbridge, Kent, UK. Quoted in Cawthorn 2010. https://www.technology.matthey.com/article/54/4/205-215/#B1 Golder Associates, 2020. Determination of the 2020 Closure Costs for the Kroondal Operations, Sibanye- Stillwater Limited, Golder Associates Africa (Pty) Ltd, 20353611-337625-1, p. 57 Grobler, M., and Kruger, R., 2015, AQPSA Marikana Mine: EMPR Amendment Report, Exigo Sustainability (Pty) Ltd, unpubl, p315 Keays, R. R., Lightfoot, P. C. (2004) Formation of Ni-Cu-Platinum Group Element sulfide mineralization in the Sudbury Impact Melt Sheet. Mineralogy and Petrology, 82 (3). 217-258 doi:10.1007/s00710-004-0050- 8 Krivolutskaya, N.A. (2014) Evolution of Trap Magmatism and Pt-Cu-Ni mineralization in the Noril'sk region. Publishing Association of Scientific Publications KMK, Moscow [in Russian].Google Scholar Malherbe, E., and Wansbury, N., 2020, Rustenburg and Kroondal UG2 Resources of the Sibanye Stillwater Platinum, Report number Rustenburg-UG2-30-04-2020, Sibanye Stillwater, unpub, p. 150 McCallum, I.S. (1996) The Stillwater Complex. In Developments in Petrology. Elsevier. p.441-483. doi:10.1016/s0167-2894(96)80015-7 Newtown Landscape Architects CC. 2014. Proposed K1 & K2 DMS Stockpile Expansion at the Kroondal Platinum Mine, Rustenburg, North-West Province. Report prepared by Newtown Landscape Architects CC for Aquarius Platinum (South Africa) (Pty) Ltd. Quoted from Arnot, N., and Stobart, B., 2016, Potgieter, J.G., 2011. Atmospheric Impact Assessment, Information/Subsections for 2011 EMPR: WPL, Central and EL, Environgaka cc, unpub, p. 57 Reczko, B.F.F., Oberholzer, J.D., Res, M., Erikson, P.G. and Schreiber, U.M. (1995). A re-evaluation of the volcanism of the Palaeoproterozoic Pretoria Group (Kaapvaal craton) and hypothesis on basin development. Journal of African Earth Sciences 21, 505-519. Reid, D.L. and Basson, I.J.,2002: Iron-rich ultramafic pegamatite replacement bodies within the Upper Critical Zone, Rustenburg Layered Suite, Northam Platinum Mine, South Africa, Mineralogical Magazine, Volume 66(6). Scoon, R.N. and Mitchell; A.A. The principal geological features of the Mooihoek platiniferous dunite pipe, eastern limb of the Bushveld Complex, and similarities with replaced Merensky Reef at the Amandelbult Mine, South Africa. South African Journal of Geology 2011; 114 (1): 15–40. Smith, D.S, Basson, I.J, Reid, D,L; Normal Reef subfacies of the Merensky Reef at Northam Platinum mine, Zwartklip Facies, Western Bushveld Complex, South Africa. The Canadian Mineralogist 2004; 42 (2): 243– 260. doi: https://doi.org/10.2113/gscanmin.42.2.243 SRK. 1999. Proposed Kroondal Platinum Mine Environmental Management Programme Report. Report No. 256720. Report prepared by Steffen, Robertson and Kirsten (South Africa) (Pty) Ltd for Kroondal Platinum Mine. Quoted from Arnot, N., and Stobart, B., 2016, Stewart, R., 2021. PGM Market Report for Sibanye-Stillwater March2021, SFA (Oxford) Ltd 202 Watson, B.P., Hoffmann, D., and Roberts, D.P. (2021). Investigation of stress in a pothole in the Bushveld Complex: A case study. In Journal of the Southern African Institute of Mining and Metallurgy. Volume 121 n.1 Johannesburg. January 2021. Zurich Insurance., 2020, Risk Assessment and Risk Improvement Assessment for Sibanye Stillwater Kroondal Operations, Republic of South Africa, Zurich Insurance, unpubl, p. 113 25.1.2 Spreadsheets and Presentations Consolidated Group structure-8 December 2020.xlsx Copy of Kroondal Mine - Finance Section Backup 20220404 Copy of TRS Reserve Tables 31 Dec 2021 v3 Final 14-04-2022.xlsx 25.2 Glossary of Terms South African Mining terms Mine Call Factor(MCF) - compares the sum of metal produced in recovery plus residue to the metal called for by the mines evaluation methods expressed as a percentage. For explanation see Tetteh and Cawood(2014). Reef – South African Mining term for a Seam. Derived from Afrikaans/Dutch rif- ridge for the Witwatersrand goldfields where the seam formed ridges in outcrop. 26 Reliance on information provided by the registrant The QPs have relied on information provided by Sibanye-Stillwater Kroondal Operations and Sibanye- Stillwater (the Registrant) in preparing the findings and conclusions regarding the following aspects of the Modifying Factors outside of the QPs’ expertise: • Macroeconomic trends, data and assumptions, and commodity prices (Section 16) • Risks (Section 21.2) Sibanye-Stillwater assess the factors above at a corporate level and has the necessary skills to make this assessment.