Skip to main content

Ivanhoe Electric Inc 8-K, filed Nov 19, 2026

Ivanhoe Electric Inc. (IE)

8-K 2026-11-19 For: 2026-11-19
View Original
Added on November 19, 2026

About this 8-K

Ivanhoe Electric Inc filed this 8-K on November 19, 2026.

Ivanhoe Electric reported initial drill results from its Gleeson Copper-Gold Project in Arizona, including 123.60 meters at 0.91% copper, 0.44 g/t of gold and 5.27 g/t of silver from 601.70 meters in hole CGD26-TR-003. Results from the first eleven completed holes found two separate mineralized domains below low angle faulting. Assays are pending for carbonate replacement zones intersected from about 1,250 meters in holes CGD26-TR-008 and CGD26-TR-009. AI summary

Items reported

  • Item 7.01: Regulation FD disclosure
  • Item 8.01: Other events
  • Item 9.01: Financial statements and exhibits