Rio Tinto PLC 6-K, filed Mar 1, 2021
Rio Tinto PLC (RIO)
6-K
2021-03-01
For: 2021-02-28
View Original
Added on
April 06, 2026
About this 6-K
Rio Tinto PLC filed this 6-K on March 1, 2021.
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, DC 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13A-16 OR 15D-16 OF
THE SECURITIES EXCHANGE ACT OF 1934
Month of February 2021
| Commission file number: 001-10533 | Commission file number: 001-34121 | ||||
| Rio Tinto plc | Rio Tinto Limited | ||||
| ABN 96 004 458 404 | |||||
| (Translation of registrant’s name into English) | (Translation of registrant’s name into English) | ||||
| 6 St. James’s Square | Level 7, 360 Collins Street | ||||
| London, SW1Y 4AD, United Kingdom | Melbourne, Victoria 3000, Australia | ||||
| (Address of principal executive offices) | (Address of principal executive offices) | ||||
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F:
Form 20-F ☒ Form 40-F ☐
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): ☐
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): ☐
Indicate by check mark whether by furnishing the information contained in this Form, the registrant is also thereby furnishing the information to the Commission pursuant to
Rule 12g3-2(b) under the Securities Exchange Act of 1934.
Yes ☐ No ☒
If "Yes" is marked, indicate below the file number assigned to the registrant in connection
with Rule 12g3-2(b): 82- ________
EXHIBIT 99
1.Stock Exchange announcement dated 1 February 2021 entitled ‘Total voting rights and issued capital’
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrants have duly caused this report to be signed on their behalf by the undersigned, thereunto duly authorised.
| Rio Tinto plc | Rio Tinto Limited | ||||||||||
| (Registrant) | (Registrant) | ||||||||||
| By | /s/ Steve Allen | By | /s/ Steve Allen | ||||||||
| Name | Steve Allen | Name | Steve Allen | ||||||||
| Title | Company Secretary | Title | Joint Company Secretary | ||||||||
| Date | 1 March 2021 | Date | 1 March 2021 | ||||||||
EXHIBIT 99.1
Notice to ASX/LSE

Total voting rights and issued capital
1 February 2021
In accordance with the Financial Conduct Authority’s (FCA) Disclosure Guidance and Transparency Rule 5.6.1R, Rio Tinto plc notifies the market that as of 29 January 2021:
1.Rio Tinto plc’s issued share capital comprised 1,255,764,439 Ordinary shares of 10p each, each with one vote.
2.8,780,753 Ordinary shares of 10p each are held in treasury. These shares are not taken into consideration in relation to the payment of dividends and voting at shareholder meetings.
Accordingly the total number of voting rights in Rio Tinto plc is 1,246,983,686. This figure may be used by shareholders (and others with notification obligations) as the denominator for the calculation by which they will determine if they are required to notify their interest in, or a change to their interest in, Rio Tinto plc under the FCA’s Disclosure Guidance and Transparency Rules.
Note:
As at the date of this announcement:
(a)Rio Tinto plc has also issued one Special Voting Share of 10p and one DLC Dividend Share of 10p in connection with its dual listed companies (‘DLC’) merger with Rio Tinto Limited which was designed to place the shareholders of both companies in substantially the same position as if they held shares in a single enterprise owning all of the assets of both companies;
(b)the Special Voting Share facilitates joint voting by shareholders of Rio Tinto plc and Rio Tinto Limited on joint electorate resolutions; and
(c)there are 371,216,214 publicly held Rio Tinto Limited shares in issue which do not form part of the share capital of Rio Tinto plc.
LEI: 213800YOEO5OQ72G2R82
Classification: 2.5 Total number of voting rights and capital disclosed under article 15 of the Transparency Directive
This announcement is authorised for release to the market by Rio Tinto’s Group Company Secretary.
Steve Allen Group Company Secretary | |||||
Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2058 Registered in England No. 719885 | |||||
Media release Page 1 of 1 Joint statement from PKKP and Rio Tinto 5 February 2021 Rio Tinto accepts that it should have communicated the recent executive changes to the PKKP in a more collaborative way. PKKP understands that the PKKP relationship is owned by the Chief Executive Iron Ore and as interim Chief Executive Ivan Vella held this accountability in an acting capacity. PKKP took a different perspective from the joint board meeting in November. The PKKP acknowledges that it was not the intention of the Rio Tinto Chairman Simon Thompson to mislead the PKKP Board and Elders at the joint board meeting. The joint Board meeting remains a seminal event in the relationship rebuild. We jointly recognise that in any relationship mistakes are going to be made and it is how we work through these that informs the strength and depth of the ongoing relationship. Both PKKP and Rio Tinto recognise that progress has been made and are equally committed to building on this momentum. Senior representatives from PKKP and Rio Tinto have had extensive dialogue on these issues, and this will continue in a respectful and direct manner. Ends Contacts PKKP Casey Cahill +61 413 992 195 Rio Tinto Jonathan Rose +61 447 028 913 EXHIBIT 99.2
EXHIBIT 99.3
Media release

Power agreement delivers improved competitiveness for ISAL smelter
15 February 2021
LONDON--(BUSINESS WIRE)-- Rio Tinto has reached agreement on an amended power contract that will allow the ISAL aluminium smelter in Iceland to continue operating with an improved competitive position.
The agreement with power supplier, Landsvirkjun, will deliver a more competitive power price and energy flexibility that is mutually beneficial for both ISAL and Landsvirkjun.
Rio Tinto Aluminium chief executive Alf Barrios said: “We are pleased to have reached an agreement on a power price that, coupled with improved efficiencies we have delivered at the site, makes ISAL more competitive.
“This provides a stronger footing to continue operations at the smelter and gives increased security for the team at ISAL, who have been doing an outstanding job in challenging conditions. We will continue to work to strengthen ISAL’s future in order to keep supplying low carbon aluminium to customers in Europe and North America, and making a significant contribution to Iceland’s economy.”
In parallel to the new agreement, Rio Tinto has decided to withdraw a complaint filed with the Icelandic Competition Authority in July 2020 regarding the energy supply for ISAL.
ISAL is wholly-owned by Rio Tinto and employs around 500 workers on site.
Page 1 of 2
Contacts
media.enquiries@riotinto.com
riotinto.com
Media Relations, United Kingdom Illtud Harri M +44 7920 503 600 David Outhwaite T +44 20 7781 1623 M +44 7787 597 493 Media Relations, Americas Matthew Klar T +1 514 608 4429 Media Relations, Asia Grant Donald T +65 6679 9290 M +65 9722 6028 | Media Relations, Australia Jonathan Rose T +61 3 9283 3088 M +61 447 028 913 Matt Chambers T +61 3 9283 3087 M +61 433 525 739 Jesse Riseborough T +61 8 6211 6013 M +61 436 653 412 | ||||
Investor Relations, United Kingdom Menno Sanderse T: +44 20 7781 1517 M: +44 7825 195 178 David Ovington T +44 20 7781 2051 M +44 7920 010 978 Clare Peever M: +44 7788 967 877 | Investor Relations, Australia Natalie Worley T +61 3 9283 3063 M +61 409 210 462 Amar Jambaa T +61 3 9283 3627 M +61 4 7286 5948 | ||||
Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885 | Rio Tinto Limited Level 7, 360 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404 | ||||
Page 2 of 2
EXHIBIT 99.4
Media release

Rio Tinto and Hydro announce intention to close Aluchemie anode plant
16 February 2021
A strategic review by Aluchemie owners Rio Tinto and Hydro has determined it is not viable to make the ongoing investments needed to continue operating the stand-alone anode production facility in Rotterdam, Netherlands, due to its weak competitive position and challenging market conditions.
As a result, production at Aluchemie is expected to finish at the end of 2021. A consultation process with the relevant European works councils and union representatives will now begin on the planned closure.
Rio Tinto Aluminium chief executive Alf Barrios said: “We have carefully considered options to make Aluchemie competitive, however the investments required to continue operations are not viable. We recognise this will impact employees and the community, and our focus now will turn to supporting the team at Aluchemie as they work with stakeholders to plan a safe and responsible closure.”
Aluchemie was started in the mid 1960s and is jointly owned by global mining and metals company Rio Tinto and global aluminium company Hydro. The plant employs 220 employees and produces 216 000 tonnes of anodes per year, after having discontinued operating four out of a total seven anode baking furnaces.
Page 1 of 2
Contacts
media.enquiries@riotinto.com
riotinto.com
Media Relations, United Kingdom Illtud Harri M +44 7920 503 600 David Outhwaite T +44 20 7781 1623 M +44 7787 597 493 Media Relations, Americas Matthew Klar T +1 514 608 4429 Media Relations, Asia Grant Donald T +65 6679 9290 M +65 9722 6028 | Media Relations, Australia Jonathan Rose T +61 3 9283 3088 M +61 447 028 913 Matt Chambers T +61 3 9283 3087 M +61 433 525 739 Jesse Riseborough T +61 8 6211 6013 M +61 436 653 412 | ||||
Investor Relations, United Kingdom Menno Sanderse T: +44 20 7781 1517 M: +44 7825 195 178 David Ovington T +44 20 7781 2051 M +44 7920 010 978 Clare Peever M: +44 7788 967 877 | Investor Relations, Australia Natalie Worley T +61 3 9283 3063 M +61 409 210 462 Amar Jambaa T +61 3 9283 3627 M +61 4 7286 5948 | ||||
Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885 | Rio Tinto Limited Level 7, 360 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404 | ||||
Page 2 of 2
EXHIBIT 99.5
Media release

Rio Tinto teams up with Paul Wurth and SHS-Stahl-Holding-Saar on low-carbon iron in Canada
February 16, 2021 02:30 AM Eastern Standard Time
LONDON--(BUSINESS WIRE)--Rio Tinto, Paul Wurth S.A. and SHS-Stahl-Holding-Saar GmbH & Co. KGaA (SHS) have signed a Memorandum of Understanding to explore the production of a low-carbon steel feedstock. This partnership brings together a leading global miner, an international leader in the design and supply of engineering solutions for integrated steelmakers and one of Europe’s best-known steelmakers.
The partnership will explore the viability of transforming iron ore pellets into low-carbon hot briquetted iron (HBI), a low-carbon steel feedstock, using green hydrogen generated from hydro-electricity in Canada.
Iron Ore Company of Canada (IOC), in which Rio Tinto holds a majority interest, will supply high-grade iron ores and expertise in mining, processing and pelletising. Paul Wurth brings expertise in plant building and process knowledge in the field of highly efficient hydrogen generation and Midrex® direct reduction plants. SHS brings deep iron and steel making expertise.
Rio Tinto’s significant presence in the Canadian provinces of Quebec and Newfoundland and Labrador makes Canada a natural location for the project. Canada provides access to cost competitive hydro-electricity, and proximity to key markets in Europe and North America. Transforming high-grade iron ore pellets into a low-carbon steel feedstock using green hydrogen, when processed in an electric arc furnace with carbon free electricity, has the potential to reduce significantly the carbon emissions associated with steelmaking.
The parties will conduct a feasibility study into the potential development of industrial scale low-carbon iron production in Canada, utilising the combined expertise of the three partners across the entire steel value chain. The feasibility study is scheduled for completion in late 2021, with an investment decision on a hydrogen based direct reduction plant at industrial scale expected to follow thereafter.
IOC president and chief executive officer Clayton Walker said: “This partnership is part of Rio Tinto’s climate strategy to pursue pro-active and action-oriented partnerships to support the development and deployment of low-carbon technologies for hard-to-abate processes like steelmaking.
“We are absolutely committed to being part of the solution on climate change and to support our customers and other stakeholders in the steel value chain as the industry transitions to a low-carbon future.”
Georges Rassel, CEO of Paul Wurth S.A, said: “This collaboration reflects Paul Wurth’s strategy to support our customers from the very beginning of their projects as a reliable and trusted partner. By associating the different players of the metal production chain, we are confident to develop the most appropriate and efficient solutions for this challenging transition towards a carbon neutral industry.”
Martin Baues, Member of the Board of Directors for Technology at SHS-Stahl-Holding Saar said: “Dillinger and Saarstahl adopted a future-focused strategy with the motto ‘proactive, carbon-free and efficient’. Within this strategy, we have defined various options for the transformation to carbon-neutral steel production. The use of hydrogen in steel production is a key factor in reducing carbon emissions. This partnership can further help us to reduce our carbon emissions on the basis of this technology, while gaining important experience in using hydrogen in steel production.”
About Rio Tinto
Rio Tinto produces materials that are essential to human progress. We have publicly acknowledged the reality of climate change for over two decades and have reduced our emissions footprint by over 30 per cent in the decade to 2020.
We have set ambitious emissions targets to reduce our carbon intensity by a further 30% and our absolute emissions by a further 15% by 2030, alongside establishing a $1 billion fund to invest in climate related projects. These targets will bring us a step closer to achieving our long-term goal of becoming net zero emissions by 2050.
In 2018, we completed the divestment of our coal assets, becoming the only major mining company not producing fossil fuels. In the same year, we also entered into the Elysis joint venture with Alcoa, with investments from the Government of Quebec and Apple, which is developing a revolutionary process to make aluminium that eliminates all direct greenhouse gas emissions from smelting.
As part of our climate strategy, we have entered into a partnerships with the world’s largest steel producer, China Baowu Steel Group, one of China’s most prestigious and influential universities, Tsinghua University and Japan’s largest steel producer, Nippon Steel Corporation to develop and implement new methods to reduce carbon emissions and improve environmental performance across the steel value chain.
About Paul Wurth
Headquartered in Luxembourg since its creation in 1870, Paul Wurth has developed in the course of its history into an international engineering company. Combining wide experience with the capacity to continuously innovate, the Paul Wurth Group is today a leading player in the design and supply of the full-range of technological solutions for the primary stage of integrated steelmaking. Paul Wurth is a company of SMS group.
A special focus is on the construction and modernisation of complete blast furnace and coke oven plants, incorporating the very latest, state-of-the-art technologies. Our portfolio also extends to direct reduction plants, environmental protection technologies as well as recycling facilities.
This partnership is part of Paul Wurth’s strategy to support steel plant operators on their journey to a carbon neutral metallurgy and the production of green steel.
About SHS - Stahl-Holding-Saar
SHS - Stahl-Holding-Saar GmbH & Co. KGaA (SHS), which was founded in 2001, is the management holding of the two large Saarland-based steel companies. Dillinger is a worldwide leader in the production of heavy plates made of steel for steel construction, mechanical engineering, off-shore, offshore-windpower and the linepipe sector. Saarstahl is a globally leading manufacturer of rod and bar steel for the automotive industry, the construction industry and general machinery. Around 13,500 employees work within SHS and generate a turnover totalling around 4.5 billion euros.
Contacts
media.enquiries@riotinto.com
riotinto.com
Media Relations, United Kingdom Illtud Harri M +44 7920 503 600 David Outhwaite T +44 20 7781 1623 M +44 7787 597 493 Media Relations, Americas Matthew Klar T +1 514 608 4429 Media Relations, Asia Grant Donald T +65 6679 9290 M +65 9722 6028 | Media Relations, Australia Jonathan Rose T +61 3 9283 3088 M +61 447 028 913 Matt Chambers T +61 3 9283 3087 M +61 433 525 739 Jesse Riseborough T +61 8 6211 6013 M +61 436 653 412 | ||||
Investor Relations, United Kingdom Menno Sanderse T: +44 20 7781 1517 M: +44 7825 195 178 David Ovington T +44 20 7781 2051 M +44 7920 010 978 Clare Peever M: +44 7788 967 877 | Investor Relations, Australia Natalie Worley T +61 3 9283 3063 M +61 409 210 462 Amar Jambaa T +61 3 9283 3627 M +61 4 7286 5948 | ||||
Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885 | Rio Tinto Limited Level 7, 360 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404 | ||||
Page 1 of 28 Notice to ASX Changes to Rio Tinto Aluminium Pacific Operations Ore Reserve and Mineral Resource Estimates 17 February 2021 Rio Tinto today announces changes in estimates of Ore Reserves and Mineral Resources at Rio Tinto Aluminium (RTA) Pacific Operations’ Weipa and Gove assets. These changes will be included in Rio Tinto’s 2020 Annual Report, to be released to the market by 22 February 2021, and are reportable changes compared to those published in the 2019 Annual Report. The Ore Reserve and Mineral Resource estimates are reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012 (JORC Code) and the ASX Listing Rules. Ore Reserves and Minerals Resources are quoted on a 100 per cent basis (100% Rio Tinto share). The RTA Pacific Operations Ore Reserve estimate has decreased by 305 Mt, from 1,530 Mt to 1,224 Mt. The reduction in Ore Reserve estimate is associated with a routine review of price assumptions over the life of the mine. There has been no material change to the economic cut-off methodology or process. The application of the updated pricing assumptions has removed lower quality material from the Ore Reserve estimate. There has been no material change to the other reserve modifying factors, including: governmental, tenure, environmental, cultural heritage, social, community or operational. RTA Pacific Operations Mineral Resources exclusive of Ore Reserves has increased by 128 Mt, from 1,949 Mt to 2,077 Mt (This includes 1,330 Mt of Inferred Resource at North of Weipa, which remains unchanged from 2019). The increase was mainly due to changes in the forecast pricing assumptions used in the reserving process. Those blocks removed from the 2020 Ore Reserve that are physically located above or below the remaining economic blocks have also been removed from the Mineral Resource. Supporting information surrounding the 2020 update to the Ore Reserve and Mineral Resource estimates has been provided below and in the appendices. EXHIBIT 99.6
Page 2 of 28 RTA Pacific Operations Mineral Resources RTA Pacific Operations Ore Reserves Mineral resources 2020 2019 2020 2019 Tonnage Grade Tonnage Grade Tonnage Grade millions millions millions millions millions Bauxite of tonnes of tonnes of tonnes of tonnes of tonnes Gove (Australia)(b)(c) O/P 23 48.6 9 48.6 2 49.6 34 28 48.7 48.2 100.0 Weipa (Australia)(b) - East Weipa and Andoom(d) O/P 35 51.1 35 11 51.1 52.1 100.0 - Nort of Weipa O/P 1,330 52 1,330 1,330 52.0 52.0 100.0 - Amrun(e) O/P 57 49.0 348 50.3 273 50.5 678 580 50.3 50.1 100.0 TOTAL 115 49.6 357 50.3 1,605 51.7 2,077 1,949 51.4 51.4 100.0 (a) Likely mining method: O/P = open pit; U/G = underground; D/O = dredging operation. Notes % Al2O3 % Al2O3 % Al2O3 % Al2O3 at end 2020 (b) Gove and Weipa Resources are stated as dry tonnes and total alumina grade. (c) Gove Resource tonnes increased following conversion of Reserves to Resources based on updated economic assumptions. (d) East Weipa and Andoom Resource tonnes increased following conversion of Reserves to Resources based on updated economic assumptions. Likely mining method(a) Rio Tinto Interest %Tonnage Grade Measured Indicated resources Inferred resources Total resources 2020 compared with 2019 at end 2020 % Al2O3 (e) Amrun Resource tonnes increased following conversion of Reserves to Resources following updated economic assumptions. at end 2020 Ore reserves 2020 2019 2020 2019 Tonnage Grade Tonnage Grade Tonnage Tonnage Grade Grade Rio Tinto share Recoverable mineral millions millions millions millions millions Bauxite(b) of tonnes of tonnes of tonnes of tonnes of tonnes Gove (Australia)(c) O/P 77 50.4 3.3 49.7 80 131 50.4 49.3 100.0 80 Weipa (Australia)(d) - Amrun(e) O/P 211 54.1 833 53.9 1,044 1,253 54.0 53.1 100.0 1,044 - East Weipa and Andoom(f) O/P 100 51.4 100 146 51.4 50.8 100.0 100 TOTAL 388 52.7 836.3 53.9 1,224 1,530 53.6 52.6 100.0 1,224 Total ore reserves 2020 compared with 2019 Type of mine(a) at end 2020 at end 2020 Interest % (e) Amrun Reserve tonnes decreased following updated economic assumptions and mining depletion. (d) Weipa Reserves are stated as dry tonnes and total alumina grade Notes (a) Type of mine: O/P = open pit, U/G = underground, D/O = dredging operation. (b) Reserves of bauxite, diamonds and iron ore are shown as recoverable Reserves of marketable product after accounting for all mining and processing losses. Mill recoveries are therefore not shown. (c) Gove Reserves are stated as dry tonnes and total alumina grade. Gove Reserve tonnes decreased following updated economic assumptions and mining depletion. (f) East Weipa and Andoom Reserve tonnes decreased following updated economic assumptions and mining depletion. % Al2O3 % Al2O3 % Al2O3% Al2O3 Average mill recovery % Proved ore reserves Probable ore reserves
Page 3 of 28 Summary of information to support the Mineral Resource estimate The RTA Pacific Operations Mineral Resource estimate is supported by a JORC Table 1 (Sections 1, 2 and 3) document provided as Appendices 1 and 2 to this release and also located at www.riotinto.com/investors/reserves- and-resources. An increase in RTA Pacific Operations Mineral Resources coincides with the write back of bauxite ore from Ore Reserves to Mineral Resources due to a routine review of price assumptions over the life of the mine. The methodology of determining Mineral Resources has not changed. The bauxite assets have been in operation for more than fifty years and are well understood. Resource work is currently more focussed on asset evaluation rather than exploration, systematically bringing the bauxite classification to higher levels of confidence. The following summary of information for Mineral Resource estimates is provided in accordance with Chapter 5.8 of ASX Listing Rules. Geology and geological interpretation RTA Pacific Operations have two bauxite deposits, one at Gove (NT) and one at Weipa (QLD). The host rocks of the two mine sites have been converted to bauxite via a continuum of weathering. High annual rainfall and a geologically stable environment has provided the perfect ingredients for these world-class bauxite deposits to form over many millions of years. A deep saprolitic zone overlain by a classic mottled zone below the bauxite ore attests to this. The process of bauxitisation involves the conversion of kaolinite to the bauxite minerals gibbsite and boehmite. The principal influence on the process is the composition, supply and movement of groundwater. The pH of the groundwater is lowered during the process of bauxitisation and we note that the process is still ongoing as we see a low pH regularly throughout the ground water monitoring bores across the RTA mining leases. To a lesser extent there are organic influences such as vegetation, and possibly burrowing organisms and temperature. Pisolitic textures are dominant, with variable cementation. However, variably cemented coarser nodule horizons are also common. Some deeper bauxite, as well as underlying laterite, contain abundant interconnected solution cavities, which may have been created geochemically and/or biologically (associated with root channels). Modern day root channel structures and infill, in the upper part of the bauxite, are common. Gibbsite is the major ore mineral, with boehmite being of lesser significance. Bauxite occurs on laterally extensive plateaus. The plateaus have been variably dissected by erosion into distinguishable main plateau areas, each with their own characteristics, (outlined further in Table 1). The bauxite orebodies are interpreted as flat-lying horizons with topography dictating the geometry. The orebodies are generally overlain by a thin (<1m) overburden cover and occasional red soil. Beneath the bauxite ore is often a transition zone defined by angular and lumpy textures and a geochemical signature of higher silica and lower alumina. The transition zone is often underlain by the ironstone; with a distinct change in physical properties, particularly the colour. Drilling techniques The current drilling method at Weipa utilizes aircore drilling. The typical aircore rig is a Land Cruiser mounted rig with a small enough wheelbase to traverse drill lines cleared with one D-6 dozer blade width. Aircore drilling forces compressed air down a space inside the drill rods to the bit face, where the air is then used to return the sample up the inner tube of the drill rod and out via a cyclone. A three bladed HQ aircore bit is attached to 4-inch rods. The drilling system has been designed to reduce grinding of the sample. Historic drilling utilised auger drilling (until 1991). Drilling at Gove is conducted using a tractor mounted 44 mm diameter vacuum drill rig. Logging, sampling, sub-sampling method and sample analysis method Logging is currently conducted on Panasonic Toughpads and data is captured in an offline acQuire logging package at the drill rig. This system allows for data validation to be applied during logging as well as a streamlined method of exporting the data for importing into the main RTA Geology database. Logging is qualitative in nature,
Page 4 of 28 i.e. based on lithology. Currently there are ~20 lithologies common to the deposits that get modelled into 4 horizons for the estimation of bauxite resources. All sample intervals (0.25 m) are logged. Logged lithologies are vetted against historical drill holes and assay parameters. Samples for geologic logging and analysis are collected on 0.25 m intervals (~2-3 kg) down hole. Whole samples are collected beneath a cyclone return system, i.e. no sample splitting is conducted, or sub samples taken. Multiscreen sampling is undertaken initially to determine optimum screen size for beneficiation at each deposit. Once determined, samples are then beneficiated at the appropriate screen size (1.7 mm for East Weipa, 0.3 mm for Andoom and 0.6 mm for the Amrun deposits). Bauxite at Gove is direct shipping ore (DSO). Samples are processed and XRF analysed for the major oxides: Al2O3, SiO2, Fe2O3, TiO2 and LOI, as well as minor elements and recovery. Estimation methodology Basic geostatistical analysis is used to help with domaining decisions. Most deposits were modelled as a single laterally extensive domain, apart from Moingum (Hey Point), where two lateral extensive domains have been modelled due to difference in source rocks affecting thickness and grade. Four horizon codes, based on the lithology and assays, are assigned for the modelling and estimation of bauxite resources at Weipa and three at Gove vertically. Interpretation and estimation are currently performed using Datamine’s Studio RM software, with variography undertaken in FSS International Consultants (Australia) GS3M software. The bauxite horizon is flattened to the mid-point of the drill hole intersections at East Weipa and Andoom, while drill hole collars are flattened to constant elevation at Amrun, Norman Creek and Moingum (Hey Point). The wireframes are filled with blocks on an in/out basis; there is no sub-blocking or block proportions used. For the bauxite horizon, major oxides; LOI and Recovery are estimated into parent cells using ordinary kriging. Overburden and red soil are assigned 0% recovery for the estimation of resources. Cemented bauxite grade is estimated as part of the bauxite horizon and assigned a 100% recovery; the proportion of cemented bauxite is estimated as an indicator variable. Major oxide chemistry is also estimated for the overburden, red soil and ironstone horizons, where data is available. Ordinary kriging is used for interpolation, using the variogram models for the bauxite. Block sizes are determined by ½ the drill hole spacing for each deposit. A multiple pass search strategy is used to estimate grades utilising different sized search ellipses that include a specified number of samples and drill holes. The lowest category (Pass 4) is not used in the East Weipa and Andoom areas. Maximum extrapolation distance is slightly less than the maximum search radii due to the requirement to use at least two holes to estimate each block. Criteria used for classification Classification within the bauxite horizon is based on the search pass used to estimate grades, using increasing search radii and decreasing numbers of samples for each subsequent pass. Passes 1 and 2 are classified as Measured Mineral Resources (120 to 180 m spacing for Weipa and 50 m to 100 m spacing for Gove), Pass 3 as Indicated (360 m spacing for Weipa and 200 m to 400 m spacing for Gove) and Pass 4 as Inferred. Reasonable prospects for eventual economic extraction RTA Pacific Operations employs a standard approach to identify Mineral Resource volumes with reasonable prospects for eventual economic extraction. Once the Ore Reserves are defined based on applied economic factors in the reserving process, the remaining blocks are evaluated based on grade cut-offs, thickness cut-offs and location (environmental, cultural heritage and infrastructure buffers) for each of the different deposits, and Mineral Resources defined.
Page 5 of 28 Summary of information to support the Ore Reserve estimate The reduction in the RTA Pacific Operations Ore Reserve estimate is associated with a routine review of price assumptions over the life of the mine. There has been no material change to the economic cut-off methodology or process, simply the application of updated pricing assumptions has removed lower quality material from the Ore Reserve estimate. The 2020 Ore Reserve estimate is supported by a JORC Table 1 (Section 4) document provided as Appendices 1 and 2 to this release and located at www.riotinto.com/investors/reserves-and-resources. The following summary of information for the Ore Reserve estimate is provided in accordance with Chapter 5.9 of ASX Listing Rules. Operational / study status Both Weipa and Gove assets have been operating continuously for several decades, and the Ore Reserve estimates and life of mine plans are updated annually. This includes the reconciliation of operating parameters and review of input assumptions into the planning processes. The Ore Reserve estimate for Amrun is based on the completed and approved feasibility study and has now been in continuous operation for two years. The Ore Reserve is mined through shallow, open cut techniques developed over several decades of operations. Once the area is tree cleared and the topsoil / overburden removed, the bauxite is hauled to the processing facility for washing and / or sizing. Product bauxite is stockpiled for shipping to both internal and external customers. Several mining areas are active at any one time to enable blending and to mitigate against operational risk. Economic assumptions Rio Tinto applies a common process to the generation of commodity price assumptions across the group. This involves generation of long-term price forecasts based on current sales contracts, industry capacity analysis, global commodity consumption and economic growth trends (this includes the bonus / penalty adjustments for quality). Exchange rates are also based on internal Rio Tinto modelling of expected future country exchange rates. The reduction in Ore reserve estimate is associated with a routine review of price assumptions over the life of the mine. Capital and operating cost estimates are sourced from internal Rio Tinto financial modelling and / or project capital estimates. Third party payments are reflective of the current agreements in place. Due to the commercial sensitivity of these assumptions, an explanation of the methodology used to determine these assumptions has been provided, rather than the actual figures. Cut-off grades The Ore Reserve cut-off is based on an economic parameter, summarised as the margin realised upon sale of the bauxite. The economic cut-off approach considers revenue (bonus/penalty), fixed / operating / capital costs, royalties and other third-party payments. Bauxite that satisfies this economic cut-off, is considered for inclusion in the Ore Reserve. There has been no material change to the economic cut-off methodology or process. Processing Weipa bauxite is beneficiated through established techniques to improve product quality and handleability. This is achieved through the removal of the finer fraction, leaving the coarser material as product. Expected bauxite recovery and quality from the beneficiation process is assessed through laboratory scale test work of samples generated from the resource drilling process. There is no beneficiation plant at Gove Operations, the bauxite is sized through a primary and secondary crushing system before being stockpiled for shipping. With no crushing loss, 100% of the bauxite mined is planned to be shipped.
Page 6 of 28 Mining and recovery factors Dilution and mining recovery parameters are applied during the Ore Reserve estimation process, based on reconciliation of past performance and are reviewed annually. As the Ore Reserve is shallow, geotechnical risks are low. Stockpile heights and wet road conditions are managed in accordance with standard operating procedures There has been no material change to other Ore Reserve modifying factors, such as: governmental, tenure, environmental, cultural heritage, social or community. Appropriate agreements and approvals remain in place to enable continued operation of these assets. Reserve classification Given the high level of confidence in the reserve modifying factors, all Measured Resources were converted to Proved Ore Reserves and all Indicated Resources were converted to Probable Ore Reserves. Inferred Resources were not considered in the estimation of Ore Reserves. No Probable Ore Reserves have been derived from Measured Resources.
Page 7 of 28 Competent Persons Statement The information in this report that relates to Mineral Resources is based on information compiled under the supervision of Mr Angus C. McIntyre, who is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM). Mr McIntyre has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity to which he is undertaking to qualify as a Competent Person as defined in the JORC Code. Mr McIntyre is a full-time employee of Rio Tinto and consents to the inclusion in this report of RTA Pacific Operations Bauxite Mineral Resources based on the information that he has prepared in the form and context in which it appears. The information in this report that relates to Ore Reserves is based on information compiled under the supervision of Mr William Saba who is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM). Mr Saba has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity to which he is undertaking to qualify as a Competent Person as defined in the JORC Code. Mr Saba is a full-time employee of Rio Tinto and consents to the inclusion in this report of RTA Pacific Operations Bauxite Ore Reserve based on the information that he has prepared in the form and context in which it appears.
Page 8 of 28 Contacts media.enquiries@riotinto.com riotinto.com Follow @RioTinto on Twitter Media Relations, United Kingdom Illtud Harri M +44 7920 503 600 David Outhwaite T +44 20 7781 1623 M +44 7787 597 493 Media Relations, Americas Matthew Klar T +1 514 608 4429 Media Relations, Asia Grant Donald T +65 6679 9290 M +65 9722 6028 Media Relations, Australia Jonathan Rose T +61 3 9283 3088 M +61 447 028 913 Matt Chambers T +61 3 9283 3087 M +61 433 525 739 Jesse Riseborough T +61 8 6211 6013 M +61 436 653 412 Investor Relations, United Kingdom Menno Sanderse T: +44 20 7781 1517 M: +44 7825 195 178 David Ovington T +44 20 7781 2051 M +44 7920 010 978 Investor Relations, Australia Natalie Worley T +61 3 9283 3063 M +61 409 210 462 Amar Jambaa T +61 3 9283 3627 M +61 472 865 948 Group Company Secretary Steve Allen Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885 Joint Company Secretary Tim Paine Rio Tinto Limited Level 7, 360 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404 This announcement is authorised for release to the market by Rio Tinto’s Group Company Secretary.
1 Weipa Table 1 Appendix 1 The following table provides a summary of important assessment and reporting criteria used at Weipa for the reporting of mineral resources and ore reserves in accordance with the Table 1 checklist in The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition). Criteria in each section apply to all preceding and succeeding sections. SECTION 1 SAMPLING TECHNIQUES AND DATA Criteria Commentary Sampling techniques • Samples for geologic logging and analysis are collected on 0.25 m intervals (~2-3 kg) downhole using aircore drilling methods. • Whole samples are collected beneath a cyclone return system (i.e. no sample splitting is conducted). • Multiscreen sampling is undertaken to determine optimum screen size for beneficiation at each deposit. • Once determined, samples are then beneficiated at the appropriate screen size (1.7 mm for East Weipa, 0.3 mm for Andoom and 0.6 mm for the Amrun deposits). Drilling techniques • The current drilling method utilises aircore drilling. • The typical aircore rig used at Weipa is a Land Cruiser mounted rig with a small enough wheelbase to traverse drill lines cleared with one D-6 dozer blade width. Aircore drilling forces compressed air down a space inside the drill rods to the bit face, where the air is then used to return the sample up the inner tube of the drill rod and out via a cyclone. A three bladed HQ aircore bit is attached to 4-inch rods. The drilling system has been designed to reduce grinding of the sample. • Historic drilling utilised auger drilling (until 1991). Drill sample recovery • No direct recovery measurements of aircore drilling samples are performed. • Whole sample is taken. • Holes are re-drilled if there is excessive sample loss (determined visually). • Sample weights are recorded before and after beneficiation in the laboratory. Logging • Standardised Rio Tinto Aluminium Weipa bauxite logging systems are utilized for drilling. • Logging is currently conducted on Panasonic Toughpads and data is captured in an offline acQuire logging package at the drill rig. This system allows for data validation to be applied during logging as well as a streamlined method of exporting the data for importing into the main RTA Geology database. • Logging is qualitative in nature, i.e. based on lithology. Currently there are ~20 lithologies common to the deposits that get modelled into four horizons for the estimation of bauxite resources. • All sample intervals (0.25 m) are logged. • The holes are generally terminated four samples (1 m) into the floor lithologies as observed by the rig geologist. • Logged lithologies are vetted against historical drill holes and assay parameters. Sub-sampling techniques and sample preparation • No sub-sampling undertaken. • Sample preparation at Weipa is carried out at the purpose-built facility. The facility consists of two Kason washing screens, two drying ovens, a multiple screening facility, and grinding units. Beneficiated, un- beneficiated (crude) and multiscreen drill samples pass through this area prior to their being assayed for the major oxides and loss on ignition (LOI). • Sample preparation at ALS, Brisbane was set up with the same specifications of equipment as Weipa, however was scalable to install up to six Kasons, larger drying ovens, more grinding capability and room for multi-screens. • The majority of analyses are undertaken at ALS laboratory in Brisbane since 2015, prior to that the majority of the analyses were done at Weipa. Quality of assay data and laboratory tests • Bauxite industry standard XRF analysis of all major elements and a suite of trace elements are undertaken on all samples. • Matrix matched field standards are systematically used. • Laboratory preparation duplicates and assay standards also form part of the QA/QC procedure. • The Weipa Laboratory participates in a “round robin” process managed through the RTA Process Improvement team. This process includes all the RTA and affiliated laboratories and is reviewed on a quarterly basis to ensure that standards are maintained. The Weipa laboratory analysts also carry out internal checks on the assay data. Results not meeting certain criteria or outside a designated range are re-analysed. Standard and duplicate samples are also used by the Mine Geology Department to monitor the performance of the laboratory via standard QA/QC routines.
2 • The ALS, Brisbane laboratory maintains its NATA accreditation through annual inspections and testing as required. RTA visit and audit both the preparation facility and analytical rooms regularly. • Every assay batch returned from the laboratories is checked through acQuire QA/QC objects before being accepted to the database for use in resource estimation. Major oxides, LOI, and KSiO2 are checked routinely against performance of field standards, lab duplicates, and lab standards. • Any results for the standards that lie outside three (3) standard deviations of the mean are classified as failing QA/QC and assays excluded from modelling. • Analysis of the performance of certified standards, field duplicates, blanks and third-party check assaying has indicated an acceptable level of accuracy and precision with no significant bias or contamination. Verification of sampling and assaying • Twin holes were historically used incorrectly. Samples were combined for the two and tested. Results were not comparable for verification purposes. Twin holes are not in use anymore. • Infill drilling programs for resource definition return results in line with the wider spaced drilling. • Data validation occurs throughout the data collection process: during data capture, during importation into the database, following import into the database and during the modelling process (hole name, locations checks, RL checks, lithology order checks, missing data, incorrect data). Location of data points • Pre-2016 drill hole peg locations were surveyed to Australian Height Datum (AHD) and the Geocentric Datum of Australia 1994 (GDA94) grid (and converted to local mine grids) by contract surveyors using Differential Global Positioning System (DGPS) survey equipment which was accurate to 10 cm in both horizontal and vertical directions. • Post 2016 surveys utilises GNSS GPS systems. Where survey has not been completed, e.g. Amrun 2018- 2019 drilling campaign, LiDAR positioning of drill collar elevations are utilised to assist in the creation of the topographic surface. Data spacing and distribution • All downhole drill sampling is at 0.25 m intervals, and samples are taken of the roof and floor. • No sample compositing is done. Orientation of data in relation to geological structure • Not applicable in lateritic bauxite deposits. All drill holes are vertical, which intersects the horizontal ore body perpendicularly. Sample security • Samples are collected, bagged, ticketed and sealed at the drill sites. Samples are placed in bulk plastic containers, with a capacity of ~ 300 samples, for shipment to the laboratory. All samples are electronically logged into a system for tracking and validation. Samples are placed on a dispatch advise form and verified by the laboratory on arrival. All assay pulps are stored at Weipa or ALS Brisbane in purpose-built sample storage facilities. Audits or reviews • An external Mineral Resource and Ore Reserve audit was completed in 2019 on the Weipa deposit. This audit had an outcome of Satisfactory with one medium and five low rated potential risks to the Mineral Resources and Ore Reserves. Actions were put in place to address all findings. • Numerous internal peer reviews and studies have also been undertaken over the years. These reviews concluded that the fundamental data collection and modelling techniques were appropriate. SECTION 2 REPORTING OF EXPLORATION RESULTS Criteria Commentary Mineral tenement and land tenure status • The Weipa Bauxite deposits are located on the western side of the Cape York Peninsula in far north Queensland, Australia. Mining Lease (ML) 7024 and ML 7031 covers the various deposits. ML 7031 was obtained through the acquisition of Alcan in 2007. ML 6024 is a separate lease that is held in order to provide infrastructure access between the north of Embley and south of Embley operations at Weipa. • ML 7024 was granted by the State Government of Queensland under a separate Act of Parliament, “The Commonwealth Aluminium Corporation Pty. Limited Agreement Act 1957”. The effective date of the lease granted under this act is 1/1/1958 and the expiry date is 31/12/2041 with an option to extend to 31/12/2062. Lease extensions past 2062 can be obtained, beyond the initial renewal period, subject to both parties’ right to terminate on two years notice. • ML 7031 was granted by the State Government of Queensland under a separate Act of Parliament “The Alcan Queensland Pty. Limited Agreement Act of 1965”. The effective date of the lease granted under this act is 1/1/1964 and the expiry date is 31/12/2047 with an option to extend to 31/12/2068. Lease extensions past 2068 can be obtained, beyond the initial renewal period, subject to both parties’ right to
3 terminate on two years notice. Exploration done by other parties • Not applicable. Weipa is a mature mining operation with more than 50 years of operational and orebody knowledge. Geology • The rocks of the Cape York Peninsula are divided into two geological units: the sedimentary rocks on the western side of the peninsula and the igneous and metamorphic rocks exposed in the hills on the eastern
4 side of the peninsula (the Coen Inlier). • The Cape York Peninsula bauxites are confined to a dissected laterite plateau, known officially as the Weipa Plateau on the west coast of Cape York Peninsula. The Weipa Plateau is one of three geomorphologic land units that are of particular interest to the geology of the bauxite and kaolin resources. The other two units are the Merluna Plain and the Mapoon Plain. • The Weipa Plateau is a low plateau, usually no more than a few tens of metres above sea level and has been dissected by various river systems resulting in a series of irregularly shaped islands. It is intensely weathered to a depth of 20 m to 30 m with the upper part of the weathered material reconstituted into various nodules as well as some partially cemented rocks. The flatness of the plateau has meant it has been immune to erosion other than by rivers eating away at the sides. Much of the plateau’s volume was removed in solution in the groundwater, which is also responsible for the formation of the bauxite. The sedimentary rocks of the Weipa Plateau fall into two categories: o The Rolling Downs Group Sediments; and o The Bulimba Formation Sediments (Weipa Beds). • These two groups of sediments are eroded and weathered to form the Weipa bauxites. The different sediments resulted in different types of bauxite formations • The Bulimba Formation sediments lie on top of the Rolling Downs Group and occupy channels that cut down into them. The Rolling Downs Group were uplifted above sea level and weathered before the Bulimba Formation sediments deposited on them. The river sediments are less homogeneous than the marine ones. Deposition occurred as short erratic events rather than a slow continuous one and a changing sea level resulted in a mixture of sands and clays. The greater variability in the sediments is reflected in greater local variability in grade of the Weipa type bauxites. • Andoom type bauxites are derived from shallow marine sediments that are fine grained, with very little quartz, and this material is generally screened at 0.3 mm. The Weipa type bauxites are derived from river deposited sediments that are coarse grained, with abundant quartz, and this material is therefore screened at 1.7 mm. Drilling at Amrun suggests a more intensely braided river system allowing more mixing between the Bulimba and Rolling Downs formations. This fits with the optimum screen size of the area being between the Andoom and Weipa deposits. Amrun is currently screened at 0.6 mm • The Cape York Peninsula bauxites are thin, tabular deposits that vary from zero to 10 m in thickness and are continuous laterally for many kilometres. The unconsolidated pisolites are generally overlain by 0.5 m topsoil and sit on an ironstone base. • The rocks of the Bulimba Formation and Rolling Downs Group have been converted to bauxite via a continuum of weathering. An annual high rainfall and a geologically stable environment has provided the perfect ingredients for a world-class bauxite deposit to form over many millions of years. A deep saprolitic zone overlain by a classic mottled zone below the bauxite mineralisation attests to this. • The process of bauxitisation involves the conversion of kaolinite to the bauxite minerals gibbsite and boehmite. The principal influence on the process is the composition, supply and movement of groundwater. The pH of the groundwater is lowered during the process of bauxitisation and we note that the process is still ongoing as we see a low pH regularly throughout the ground water monitoring bores across the RTA mining leases. To a lesser extent there are organic influences such as vegetation, and possibly burrowing organisms and temperature. • The dissolution of both kaolin and quartz control the distribution of silica grades in the deposits. The combination of kaolin and quartz distributions results in a typical vertical chemical profile that is usually found throughout the deposits and appears to be independent of the bauxite thickness i.e. the same vertical grade trend is found in both thin and thick bauxites. The typical vertical grade profile for silica is high silica at the top of the bauxite, which quickly drops to a much lower silica value that plateaus for the majority of the profile and then rises quickly back to high silica values again right at the base of the bauxite profile. As alumina is left behind by the dissolution of kaolinite, the typical vertical grade profile for alumina is almost the inverse of silica. The relationships between the genetic processes and the resulting grade profiles are displayed in the figure on the next page.
5 Drill hole Information • As this report relates to Mineral Resources and no Exploration Results are being reported, this section is considered not applicable. Resource work is currently more focussed on asset evaluation rather than exploration, systematically bringing the bauxite classification to higher levels of confidence. Data aggregation methods • Not applicable. Weipa is a mature mining operation with more than 50 years of operational and orebody knowledge. Relationship between mineralisation widths and intercept lengths • All drill holes have been drilled perpendicular to the horizontal stratigraphy of the deposit. • All known horizons of the deposits: overburden, red soil, bauxite and ironstone are intersected and sampled during drilling. Drilling continues for 1 m into the ironstone to ensure the transitional boundary between the ore and floor is intersected. Diagrams • Type section for the Weipa deposits. Balanced reporting • Not applicable. Weipa is a mature mining operation with more than 50 years of operational and orebody knowledge. Other substantive exploration data • Not applicable. Weipa is a mature mining operation with more than 50 years of operational and orebody knowledge. Further work • Drilling will continue in the future to further support the five-year and life of mine plans, as well as options for future growth.
6 SECTION 3 ESTIMATION AND REPORTING OF MINERAL RESOURCES Criteria Commentary Database integrity • Data capture is on Panasonic Toughpad digital loggers that have internal validation rules that identify logging errors. • The geological drill hole database (RTA Geology) is managed by the Bauxite Geology Team within Rio Tinto Aluminium. Drilling data is securely stored in a Microsoft SQL Server using an acQuire front end. acQuire is a third-party software product that provides a user-friendly interface to SQL Server and consists of two components: • a Relational Data Model (structured storage tables and links) optimised for the storing of exploration and mining data information; and • a Software System (objects for data collect/importing/exporting, validation, viewing, modification, etc.) to manage the data and provide end user functionality for the optimum use of exploration and mining data. • The database is located on a virtual server hosted in Rio Tinto’s Azure cloud servers in Sydney. They are backed up daily in accordance with Rio Tinto’s standard back up procedure. • The drill hole database used for Mineral Resource estimation has been internally validated. Methods include checking: o acQuire scripts for relational integrity, duplicates, total assay and missing / blank assay values; o Domain names; o Null and negative grade values; o Missing or overlapping intervals; o Duplicate data. • Drill hole data was also validated visually by domain and compared to the geological model. Site visits • The Competent Person for the Weipa Mineral Resource visits the site on a regular basis and is involved in all aspects relating to the ore body knowledge. Geological interpretation • The Weipa bauxite geology is not complex in nature and is well understood as a predominantly pisolitic lateritic weathering profile. • Geological modelling of the bauxite horizon is undertaken using drill hole lithological logging and assay data. Logged lithologies are grouped into four horizons for modelling and estimation purposes, these are: o Overburden (Soil, Overburden, Sand) o Red Soil (Red Soil and Soil Red) o Bauxite (Bauxite, Clay Bauxite, Cemented Bauxite, Transition and Clay Transition) o Ironstone (Ironstone, Clay ironstone, Transition, Clay Transition and Clay) Transition and Clay Transition difficult to log in the field, horizon allocation based on grade • Cross-sectional interpretation of the bauxite stratigraphy is conducted. Three-dimensional wireframes of the sectional interpretations are automatically produced and used to generate and inform the block model. • Geological models using the 1970’s data (4 out of 16 models) are not as reliable as those using post 1995 data due to the difference in the quality of drilling and sampling techniques. These areas currently have a downgraded classification and are systematically being replaced with new holes to increase confidence in the Mineral Resource estimation. Dimensions • The Weipa bauxite deposits are laterally very extensive, covering the majority of ML 7024 and ML 7031 (~380k ha). Deposits vary in average thickness from 1.5 m to around 8 m and vary from 0.3 m to 0.6 m below surface cover. Estimation and modelling techniques • Basic geostatistical analysis is used to help with domaining decisions. Most deposits were modelled as a single domain, apart from Moingum (Hey Point) where two domains have been modelled due to differences in bauxite thickness, grades and source rocks. • Interpretation and estimation are performed using Datamine’s Studio RM software, with variography undertaken in FSS International Consultants (Australia) GS3M software. • Four horizon codes, based on the lithology and assays, are assigned for the modelling and estimation of bauxite resources, see the Geological Interpretation section. Each deposit is a single domain laterally, divided into four horizons vertically. • The bauxite horizon is flattened to the mid-point of the drill hole intersections at East Weipa and Andoom, while drill hole collars are flattened to constant elevation at Amrun, Norman Creek and Moingum (Hey Point). The wireframes are filled with blocks on an in/out basis; there is no sub-blocking or block proportions used. • Major oxides; LOI and Recovery for the bauxite horizon are estimated using ordinary kriging into parent cells. • Overburden and red soil are assigned 0% recovery for the estimation of resources.
7 • Cemented bauxite grade is estimated as part of the bauxite horizon and assigned a 100% recovery; the proportion of cemented bauxite is estimated as an indicator variable. • Major oxide chemistry is also estimated for the overburden, red soil and ironstone horizons, where data is available. Ordinary kriging is used for interpolation, using the variogram models from the bauxite domain. • A multiple pass search strategy is used to estimate grades, as shown in the following table. Pass 4 is not used in the East Weipa and Andoom areas. Maximum extrapolation distance is slightly less than the maximum search radii due to the requirement to use at least two holes to estimate each block. Search Radii Samples Pass X (m) Y (m) Z (m) Min Max Per Hole 1 120 120 1.0 12 24 5 2 180 180 1.5 8 24 5 3 360 360 3.0 8 24 5 4 720 720 6.0 8 24 5 • There are no extreme grade values, so no grade cutting is required. • Estimation parameters and search distances are determined from consideration of the drill hole and sample spacing in each deposit, as well as the anisotropy of the variogram models. • The plan extents of the block models extend at least two blocks past the drilling grid. In the vertical direction, four ‘edge’ blocks are created below the base of drilling. • The block size is set at half the drill hole spacing in the horizontal (40 m x 40 m at Andoom and East Weipa; 50 m x 50 m at Amrun) and at the sample spacing in the vertical (i.e. 0.25 m). • The model block size effectively is the selective mining unit (SMU). • Deleterious element silica is assayed using XRF. Kaolinite (reactive silica) is determined using NIR analysis. Quartz is determined by difference. • No specific assumptions are made regarding the correlation of variables during estimation as each element is estimated independently. Some attributes do show strong positive or negative correlation in the drill hole samples, and the similarity in variogram models for different attributes and identical search parameters effectively guarantee that these correlations are preserved in the estimates. • Routine validation of the block model estimation is completed using global model versus sample statistics, swathe plots, grade tonnage curves, volume checks, and visual cross-section comparisons (block estimates against drill hole samples). Filtering by search volume and number of samples can improve comparisons. • The Mineral Resource estimates take appropriate account of previous estimates and mine production. The new models are broadly comparable with previous estimates despite significant changes in methodology. While detailed reconciliation has not been undertaken, the new models appear to reconcile with mine production within tolerable limits, as previous estimates did. Moisture • All Mineral Resource tonnages are reported on a dry basis. • All Mineral Resources are reported as the beneficiated dry product, except for North of Weipa (reported as DSO product). Cut-off parameters • Grade cut-offs are routinely used to determine the potential Mineral Resources of the modelled horizons. Where lithological contacts are transitional, chemical cut-offs based on alumina and silica are used with <15% SiO2 and > 40% Al2O3. These blocks are then reviewed against location (buffer areas), as well as thickness cut-offs ranging from 0.5 m to 1 m for each deposit. • The estimation of Ore reserves utilises an economic parameter, summarised as the margin realised upon sale of the bauxite. The economic parameter is used as a check to validate technical resource assumptions applied in determining available resources. Mining factors or assumptions • Weipa is mined through shallow open cut techniques developed over several decades of operations. After topsoil is removed, front end loaders excavate the bauxite and belly dump trucks transport the bauxite to the beneficiation plant. • As the Weipa orebodies are shallow, geotechnical risks are extremely low. Pre-production drilling is completed in order to provide better definition of the roof and floor contacts for the five-year mine planning process. • Estimates include internal dilutional but no allowance for external dilution or mining recovery. Dilution and mining recovery are applied during the reserving process, not during estimation. • A minimum mining thickness for the bauxite horizon of 0.5 m is used for the final determination of resource figures. Metallurgical • Weipa bauxite is beneficiated through established techniques to improve product quality and handleability.
8 factors or assumptions This is achieved through the removal of the finer fraction and leaves the coarser material as product. • The beneficiation process typically involves wet screening and may include the use of cyclones and classifiers depending on the part of the deposit being beneficiated. • Expected bauxite recovery and quality from the beneficiation process is assessed through laboratory scale test work of samples generated from the resource drilling process. • Bauxite mineralogy has been investigated through numerous studies, primarily using wet chemical techniques, to understand how it will react in the Bayer Process, which is used to extract the alumina at the refineries. • A proprietary mineralogical calculator “MinCalc” is used to estimate bauxite mineralogy and Bayer processing grade for Cape York ore from the routinely collected elemental chemistry and thermogravimetry, as routine wet chemical techniques are prohibitively expensive. MinCalc calibration is orebody specific and is validated and recalibrated during the life of mine operations. Environmental factors or assumptions • East Weipa, Andoom and Amrun have obtained all relevant environmental approvals required to continue operations. • Operation of tailings dams at Weipa (East Weipa and Andoom) and Amrun are covered by relevant government permits. Bulk density • Bulk density is not measured on drill hole samples and is not modelled. • Bulk density has been determined by using the Sand Replacement Method and Nuclear Density Gauge Testing according to Australian standards AS 1289.5.3.1-1993 and AS 1289.5.8.1-1995. • A number of studies have been conducted over the deposits with the most common test pit spacing being 5,000 m. This produced the bulk density utilised in resource tonne calculations. • Default values are also assigned to cemented bauxite, overburden and floor material for each of the different deposits at Weipa, see table below. Bulk Density Parameters Value (t/m3) Overburden 1.23 Bauxite 1.47 – 1.67* Cemented Bauxite 2.50 Ironstone/Floor 1.42 *Different for each deposit Classification • Drilling is conducted to a 76.2 x 76.2 m (Andoom and East Weipa) or 50 m x 100 m (at Amrun) spacing for grade control purposes. • To be declared a Measured Resource a deposit must be drilled to a 152.4 m x 152.4 m (Andoom and East Weipa) or 100 m x 200 m (at Amrun) spacing. • Indicated Resources are drilled on a 305 m x 305 m (Andoom and Weipa) or 200 m x 400 m (at Amrun) spacing. • Inferred Resources are drilled on a 914.4 m x 914. 4m (Andoom and East Weipa) or 800 m x 1200 m (at Amrun) spacing and utilize multiscreen drilling. • Classification within the bauxite horizon is based on the search pass used to estimate grades, using increasing search radii and decreasing numbers of samples for each subsequent pass. Passes 1 and 2 are classified as Measured Resources, Pass 3 as Indicated and Pass 4 as Inferred. Search Radii Samples Resource Category Pass X (m) Y (m) Z (m) Min Max Per Hole Measured 1 120 120 1.0 12 24 5 2 180 180 1.5 8 24 5 Indicated 3 360 360 3.0 8 24 5 Inferred 4 720 720 6.0 8 24 5 • Appropriate account has been taken of all relevant factors. • The Competent Person is satisfied that the current Mineral Resource classification reflects the relevant factors for the deposit. Audits or reviews • An external Resource and Reserve audit was completed in 2019 on the Weipa deposit. This audit had an outcome of Satisfactory with one medium and five low rated potential risks to the Mineral Resources and
9 Ore Reserves. Actions were put in place to address all findings. • Numerous internal peer reviews and studies have also been undertaken over the years. These reviews concluded that the estimation techniques were appropriate. Discussion of relative accuracy/ confidence • The relative accuracy and confidence level in the Mineral Resource estimates are considered to be in line with the generally accepted accuracy and confidence of the nominated JORC Mineral Resource categories. This has been determined on a qualitative, rather than quantitative, basis, and is based on the estimator’s experience with a number of deposits at Cape York and similar deposits elsewhere. The main factors that affect the relative accuracy and confidence of the estimates are the drill hole spacing and the local definition of the lithological horizons. • The estimates are local, in the sense that they are localised to model blocks of a size considered appropriate for local grade estimation. The tonnages relevant to technical and economic analysis are those classified as Measured and Indicated Mineral Resources. SECTION 4 ESTIMATION AND REPORTING OF ORE RESERVES Criteria Commentary Mineral Resource estimate for conversion to Ore Reserves • The Ore Reserve estimates are developed from the geological models current as at September 2020, and the Mineralogy model updated in 2020. • Mineral Resources are stated exclusive of Ore Reserves. Site visits • The Ore Reserves Competent Person has been employed by Rio Tinto Aluminium for a significant period and has visited Weipa several times in recent years. Study status • Weipa Operations has been operating continuously for several decades, and the Ore Reserve estimate and life of mine plan are updated annually. This includes the reconciliation of operating parameters and review of input assumptions into the planning processes. • The Ore Reserve estimate for Amrun is based on the completed and approved feasibility study and has now been in continuous operation for two years. This includes the reconciliation of operating parameters and review of input assumptions into the planning processes. Cut-off parameters • The Ore Reserve cut-off is based on an economic parameter, summarised as the margin realised upon sale of the bauxite. The economic cut-off approach considers revenue (bonus/penalty), fixed/operating/capital costs, royalties and other third-party payments. Bauxite that satisfies this economic cut-off, is considered for inclusion in the Ore Reserve. Mining factors or assumptions • The Ore Reserve is mined through shallow, open cut techniques developed over several decades of operations. Once the area is tree cleared and the topsoil/overburden removed, the bauxite is hauled to the beneficiation plant for processing. Several mining areas are active at any one time to enable blending and to mitigate against operational risk. • As the Ore Reserve is shallow, geotechnical risks are low. Stockpile heights and wet road conditions are managed in accordance with standard operating procedures • Dilution and mining recovery parameters are applied during the Ore Reserve estimation process, based on reconciliation of past performance and reviewed annually. • Minimum bauxite mining thickness of 0.9 m is used for Amrun Ore Reserve estimation. • Minimum bauxite mining thickness of 0.5m is used for East Weipa & Andoom Ore Reserve estimation, with an upper bench minimum mining thickness of 0.3 m. • Inferred Mineral Resources are not considered in the estimation of Ore Reserves. Metallurgical factors or assumptions • Weipa bauxite is beneficiated through established techniques to improve product quality and handleability. This is achieved through the removal of the finer fraction, leaving the coarser material as product. The beneficiation process typically involves wet screening and may include the use of cyclones and classifiers depending on the part of the deposit being beneficiated. • Expected bauxite recovery and quality from the beneficiation process is assessed through laboratory scale test work of samples generated from the resource drilling process. • Extractable alumina is calculated through application of a Mineralogy model. Environmental • All relevant environmental approvals have been obtained to continue operations. • An EIS has been completed for Amrun with the relevant governmental approvals having been obtained. • Operation of tailings dams at Weipa (East Weipa, Amrun and Andoom) are covered by relevant government permits. Infrastructure • As East Weipa, Andoom and Amrun are all established sites, all appropriate infrastructure for the existing operation is already developed. This includes water, power, sewage, stores, maintenance workshops,
10 administration buildings and the Weipa town-ship. Any infrastructure expansion required in the future is allowed for in the financial modelling that supports the Ore Reserve. Costs • Operating and sustaining capital costs are sourced from the Weipa Operations financial model. • Future capital costs are based on project study estimates or five-year plan sustaining capital amounts. • Traditional owner and carbon tax assumptions are factored into the financial modelling. • Exchange rates are based on internal Rio Tinto modelling of expected future country exchange rates. Revenue factors • Commodity prices are based on internal Rio Tinto modelling of the future supply and demand balance for bauxite, alumina and aluminium. This includes the bonus and penalty adjustments for quality. • Queensland royalties are included in the financial modelling at 10.0% of the bauxite price. • Exchange rates are based on internal Rio Tinto modelling of expected future country exchange rates. Market assessment • Industry analysis is undertaken to assess the existing and future supply and demand balances in bauxite, alumina and aluminium. This includes assessing likely incentive pricing required to bring on new capacity. • Internal Rio Tinto forecasting revises production guidance on an annual basis. Economic • Operating costs are built up from first principles while capital costs are included based on current estimates. Appropriate escalation is built in where capital costs are to be incurred in the future. • The discount rate to be used in the NPV model is supplied from Rio Tinto corporate and is set based on risk adjusted cost of capital. • Sensitivity analysis is carried out to assess key project drivers and the sensitivity of the project economics to movements in these drivers. Social • Weipa has in place the Weipa Community Co-existence Agreement (WCCCA) with local traditional owners. It also has a Community Relations department that seeks to build relationships with the local communities in and around Weipa. Other • Tenure to exploit the Weipa deposit is granted through two state agreements and is held through two mining leases ML 7024 and ML 7031. • The Queensland Government Comalco (ML 7024) lease expires in 2041 with an option of a 21-year extension, then two years’ notice of termination; the Ely Alcan Queensland Pty. Limited Agreement Act 1965 (ML7031) expires in 2048 with a 21-year right of renewal with a two-year notice period. • An EIS process was completed for the Amrun brown field mining expansion. Both the Queensland and Commonwealth governments have approved the EIS subject to several conditions. Classification • Given the high level of confidence in the reserve modifying factors, all Measured Resources were converted to Proved Ore Reserves and all Indicated Resources were converted to Probable Ore Reserves. • Inferred Mineral Resources are not considered in the estimation of Ore Reserves. • The Competent Person is satisfied that the current classification is reasonable for the Weipa Ore Reserves. • No Probable Reserves have been derived from Measured Resources. • The Competent Person is satisfied that the stated Ore Reserve classification reflects the outcome of technical and economic studies. Audits or reviews • A Mineral Resource and Ore Reserve internal audit was completed in 2019 and in 2015 on the Weipa deposit. These audits concluded that there were medium and low rated potential risks to the Mineral Resources and Ore Reserves. All findings from the recent audit have been actioned for completion by end of 2021. Discussion of relative accuracy/ confidence • Ore Reserve estimates are compared with production data on a half yearly and annual basis at Weipa. This reconciliation shows that for all key parameters, production was within ±7% of the estimates for calendar year 2020.
1 Appendix 2 Gove Table 1 The following table provides a summary of important assessment and reporting criteria used at Gove for the reporting of mineral resources and ore reserves in accordance with the Table 1 checklist in The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition). Criteria in each section apply to all preceding and succeeding sections. SECTION 1 SAMPLING TECHNIQUES AND DATA Criteria Commentary Sampling techniques • All sampling has been completed at 0.25 m intervals using a vacuum drill rig. Samples are recovered as drill chips and are typically 0.7kg in weight. • Samples of waste material (overburden, laterite) are not always sent for assay. The decision of which samples to send for assay is made by the logging Geologist. • In every case, the full sample is sent to the laboratory for preparation (including homogenisation) and assay. Drilling techniques • Drilling is completed using a tractor mounted 44 mm diameter vacuum drill rig. Drill sample recovery • No direct recovery measurements of samples are performed on the drill rig. Sample weights are recorded at the laboratory, and the recovery at the rig is visually estimated and recorded as part of the logging as a percentage of what is expected. Logging • Geological logging is performed from top to bottom of every drill hole on 0.25 m intervals. • Geological logging includes specific detail on lithology and estimated recovery as a minimum for each sample. Up to 2 lithologies can be logged for each sample, enabling a more accurate description of the sample than one lithology would. Sub-sampling techniques and sample preparation • No sub-sampling undertaken. • The entire 0.25 m sample interval is submitted for preparation and analysis. Field split duplicates are collected at the rate of 1:100 samples using a manual riffle splitter at the drill site. • The entire sample is oven dried and then pulverised. • XRF determination is used to analyse the major elements Al2O3, SiO2, Fe2O3, TiO2 as well as a suite of minor oxides, and LOI by TGA Leco instrument (1000°C) for each 0.25 m sample. Quality of assay data and laboratory tests • Matrix matched standards and duplicates are submitted at the rate of 1:100. • For each assay batch reported, field standards, field duplicates, lab standards and lab repeats are checked via a database QA/QC object, which displays information on standards and duplicates, contained in the batch before the batch is accepted in the database. • After the assay data is accepted and imported, multiple batches can be viewed using QA/QC objects in the database, to detect overall trends in the data. • If a batch is rejected, a thorough analysis is conducted into the reason, and if no obvious explanation can be found, re-analysis is requested from the laboratory. Verification of sampling and assaying • Twinned holes were historically used to ensure sampling and assay results are consistent over a short distance. They can also be used to double check short-distance variability in the ore. • QA/QC data exists and confirms that the sample assays are likely to be representative and are appropriate for inclusion in the mineral resource estimate. Location of data points • Drill holes are surveyed by mine surveyors. Drilling completed in 2013 was surveyed using real time kinematic GPS (Leica GPS 1200 - GPS & Glonass) +/- 50 mm horizontal, +/- 100 mm vertical precision). Earlier drilling has variable survey methods. A project wide LiDAR DTM survey has been used in conjunction with the collar surveys to provide a complete terrain model. Collar exclusions based on uncertainty of location are managed in the database Collar table with two fields “Collar_Surveyed” and “In_Res_Calc”.
2 Data spacing and distribution • The majority of the drilling for Gove has now been completed on a 50 m x 50 m grid, which is the spacing for a Measured Resource. • Areas not drilled on a 50 m x 50 m grid are either on the edges of the plateaus or have already been mined. Areas that have been drilled to the standard 200 x 200 m grid are scheduled to be drilled on a 50 m x 50 m grid well in advance of mining. Orientation of data in relation to geological structure • All holes are vertical which is perpendicular to the sub-horizontal weathering/laterite domains hosting the bauxite resource. Sample security • Samples are collected and grouped into bulka-bags at the drill site. Bags ready for shipping to the laboratories are stored in company warehouse fenced lots. Transport of samples is via barge to Darwin and road transport to Bureau Veritas, Perth where all bags are matched against dispatch information and stored in the laboratory warehouse prior to preparation. Audits or reviews • Numerous audits and reviews of previous Mineral Resource and Ore Reserve estimates have been undertaken by independent consultants, including Xstract and Snowden. SECTION 2 REPORTING OF EXPLORATION RESULTS Criteria Commentary Mineral tenement and land tenure status • Rio Tinto mines bauxite from its mining lease at Gove, located 650 km east of Darwin in northeast Arnhem Land in the Northern Territory, Australia. The majority of the bauxite product is shipped to external customers, with moderate internal consumption at Rio Tinto alumina refineries in Gladstone. The figure below outlines the location of the operation. 5 km N
3 • The operations at Gove are covered by a number of Special Purposes Leases, a Special Mineral Lease and a Residue Disposal Area Lease. In 1968, an agreement was made between the Commonwealth of Australia and Nabalco Pty Ltd for the granting of a Special Mineral Lease (SML 11) pursuant to the Mining Act (Gove Peninsula Nabalco Agreement). SML 11 has been divided into three parts specifically to reflect the agreement conditions to use the leased land for the purposes granted. The table on the following page summarises the SML 11 use and areas. Lease Use Lease Area (ha) SML 11 Part 1 Mine 20,018 SML 11 Part 2 Conveyor 282 SML 11 Part 3 Refinery 191 • In 2011, Gove Operations renewed all its lease agreements including the Special Mineral Lease covering the mine, conveyor and refinery (SML 11 Parts 1, 2, and 3) and some associated Special Purposes Leases. A new Residue Disposal Area (RDA) lease agreement replaces the previous SPL 403 lease. All leases have been renewed until 2053. The Community & External Relations Department at Gove Operations are responsible for maintaining the lease arrangements. The table and map below summarise the leases that cover the Gove Operations. Lease Use Lease Area (ha) Date of Lease Expiry SML 11 Part 1 Mine 20,018 29 May 2053 SML 11 Part 2 Conveyor 282 29 May 2053 SML 11 Part 3 Refinery 191 29 May 2053 SPL 213 Bulk Cargo Wharf 13 29 May 2053 SPL 217 General Cargo Wharf 14 29 May 2053 SPL 249 Foreshore Protection 8 29 May 2053 SPL 253 Water Discharge 0.1 29 May 2053 SPL 277 Cooling Water Intake 0.7 29 May 2053 Residue Disposal Area Lease Residue Disposal 5,132 29 May 2053 SPL 214 Nhulunbuy Township 660 29 May 2053 SPL 250 Industrial Area 50 29 May 2053 SPL 251 Conveyor Access 23 29 May 2053
4 Exploration done by other parties • Not applicable. Gove is a mature mining operation with more than 40 years of operational and orebody knowledge. Geology • Bauxite deposits at Gove occur at a latitude slightly more than 12 degrees south of the equator. The bauxite appears to be a weathering product of Cretaceous marine sediments, which overlie Proterozoic basement rocks of the Arnhem Inlier. Uplift, weathering, and erosion of the sediments, as well as formation of the bauxite, took place during the Tertiary, but exact timing and detail of events remains uncertain. Marine reworking of weathered products is likely to have taken place, possibly more than once. • Pisolitic textures are dominant, with variable cementation. However, variably cemented coarser nodule horizons are also common. Some deeper bauxite, as well as underlying laterite, contain abundant interconnected solution cavities, which may have been created geochemically and/or biologically (associated with root channels). Modern day root channel structures and infill, in the upper part of the bauxite, are common. Gibbsite is the major ore mineral, with boehmite being of lesser significance. • Bauxite occurs on top of a gently undulating plateau at approximately 30 to 70m above sea level, over an area measuring approximately 20km east-west by 15km north-south as seen in the figure below. The plateau has been variably dissected by erosion into three main plateau areas. Main Plateau is the largest contiguous bauxite area, whilst Rocky Bay and Eldo are two adjacent smaller bauxite areas, figure below. The present day extent of the bauxite likely represents a fraction of what was originally present. SML 11 Part 1 SML 11 Part 3 Residue Disposal Area 5 km N
5 • The bauxite horizon has historically been up to 10m thick but is more typically 2 m to 4 m in thickness. It comprises several distinct layers in either a dominantly cemented (“hard”) profile, or a dominantly poorly cemented to uncemented (loose or soft) profile. The latter tends to be thicker and occupies hollows in the plateau surface and is often considered to be a proximal erosion/deposition product of the “hard” profile bauxite. • Hard profile bauxite generally consists of footwall vuggy laterite (Lat), overlain by nodular bauxite (Lower Nodules – Nod), overlain by extremely vuggy “tubular” bauxite (Tub), overlain by strongly cemented pisolitic bauxite (Cemented Hard - CH), overlain by weakly cemented pisolitic bauxite (Cemented Soft - CS), overlain by a thin loose pisolite layer (LP), overlain by a thin overburden layer (OB) being a mix of loose pisolites and topsoil, figure on next page. • All of the lithologies described above are generally elevated in bauxitic alumina throughout the deposit plateau. The extent of the mineralisation described therefore depends on the chemical grade threshold and thickness limits applied.
6 Drill hole Information • As this report relates to Mineral Resources and no Exploration Results are being reported, this section is considered not applicable. Resource work is currently more focussed on asset evaluation rather than exploration, systematically bringing the bauxite classification to higher levels of confidence. Data aggregation methods • In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (e.g. cutting of high grades) and cut-off grades are usually Material and should be stated. • Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail. • The assumptions used for any reporting of metal equivalent values should be clearly stated. Relationship between mineralisation widths and intercept lengths • All drill holes have been drilled perpendicular to the horizontal stratigraphy of the deposit. • All known horizons of the deposit are intersected and sampled during drilling. Drilling continues for 1 m into the floor horizon to ensure the transitional boundary between the ore and floor is intersected. Diagrams • Refer to previous sections for location and tenements maps, as well as a type section. Balanced reporting • Not applicable. Gove is a mature mining operation with 40 years of operational and orebody knowledge. Other substantive exploration data • Not applicable. Gove is a mature mining operation with 40 years of operational and orebody knowledge. Further work • Drilling will continue in the future to further support the five-year and life of mine plans, as well as options for future growth. SECTION 3 ESTIMATION AND REPORTING OF MINERAL RESOURCES Criteria Commentary Database integrity • Data is stored in an SQL database with the acQuire software as front end. Data management and data access was managed on site up to 2004. From 2004 to 2008 data was managed by Snowden. From 2008 to
7 2012 data was managed by Rio Tinto Alcan. From 2012 to 2013 Snowden was responsible for maintaining the database. From 2014 onwards Rio Tinto Aluminium has again managed the database. • Data is logged directly into an acQuire logging package which retains database rules offline. When the data is uploaded to the database, further checks are run. Spatial validation is completed in both 2D and 3D software packages prior to releasing the data for modelling. Site visits • The Competent Person for the Gove Resources visits the site regularly. Geological interpretation • Interpretation of the bauxite (alumina) mineralisation is based on the physical logging of regolith domains, and on chemical zonation based on results from analysis. Overburden and low alumina lateritic formations bound the alumina enriched bauxite horizon. • Internal dilution was incorporated into each lithological domain to maintain continuity. All bauxite material is oxidised and hydrated aluminium. Dimensions • The Gove deposits extend over an area approximately 20 km east-west by 15 km north-south that includes three separate lateritic bauxite plateaus (Main Plateau, Rocky Bay and Eldo). The bauxite horizon averages 3.5 m in thickness but can be up to 10 m thick and is typically 0.6 m (up to 8.5 m) below surface cover. Estimation and modelling techniques • A three-dimensional (3D) block model was created for all post-2003 drilling. • Basic geostatistical analysis is used to help with domaining decisions. • Transformations are used in the Z (vertical) direction to better model the bauxite horizon chemistry. • Major oxides and LOI for the bauxite horizon are estimated using ordinary kriging. • Major oxide chemistry is also estimated for the overburden and ironstone horizons. Where a suitable variogram model can be established ordinary kriging is used for interpolation, otherwise inverse distance weighting cubed (or squared) is used for estimation. • Estimation parameters and search distances are determined from kriging neighbourhood analysis. • The 3D block model is automatically generated in the RTA macro process (ResMod1999) in Datamine. • The plan extents of the 3D block model extend one block past the drilling grid. In the vertical direction four ‘edge’ blocks are created both at the top and bottom of the bauxite horizon. • The block size is set at half the drill-hole spacing in the horizontal (i.e. 25 m x 25 m) and at the sample spacing in the vertical (i.e. 0.25 m). • Silica is assayed using XRF. Kaolinite (low temperature reactive silica) is determined using NIR analysis (done during 2004 campaign only). • Routine validation of the block model estimation is completed using global model versus sample statistics, swathe plots, grade tonnage curves, volume checks, and visual cross-section comparisons (block estimates against drill hole samples). Filtering by kriging variance, search volume, and number of samples can improve comparison. • A two-dimensional (2D) model was created to include all pre 2004 drilling. • Thickness estimated using Inverse Distance weighted to the power of three (ID3). • Block grades for alumina, silica, iron oxide, titanium oxide and loss on ignition are estimated using ordinary kriging into parent cells of dimensions 25 mE by 25 mN by 0.25 m RL. Density values are assigned based on lithology. • The estimated thickness is applied to the 2D model, creating a 3D model. • Semi-variograms are modelled for each lithology for each area and the best fit variograms selected. They show ranges of continuity between 1,700 m and 7,000 m for alumina and 1,510 m to 4,000 m for silica. Moisture • All Mineral Resource tonnages are reported on a dry basis. • All Mineral Resources are reported as crude (DSO) dry product. Cut-off parameters • No block cut-off is applied to the Mineral Resource estimate reported. • For the 3D model horizon interpretation, a cut-off of < 16% silica and > 35% alumina is specified for a sample to be considered bauxite. This threshold is chosen to better match the lithological logging and to give continuity to the boundaries of the bauxite horizon. • For the 2D model an arbitrary and historical cut-off (threshold) of < 12% silica and > 40% alumina is specified for a sample to be considered bauxite. • No top cuts were applied to the bauxite (alumina and silica) grades. • Top-cut values are applied to the boehmite and gibbsite grades using the 99.5 percentile for each lithology
8 for each area, prior to estimation. Mining factors or assumptions • Model assumes open pit mining of all defined resources and a minimum mining thickness of 1.0 m for the bauxite horizon. • Gove is mined through shallow open cut techniques developed over several decades of operations. After topsoil is removed, dozers rip and push down the ore, followed by front end loaders to excavate the bauxite and rear tipper haul trucks transport the bauxite to the crushing plant. • As the Gove orebody is shallow, geotechnical risks are extremely low. Pre-production drilling is completed in order to provide better definition of the roof and floor contacts for five-year mine planning process. • Dilution and mining recovery parameters are applied in the estimation process based on reconciliation of the reserve model to actual performance. Metallurgical factors or assumptions • Successful and representative beneficiation assessments have been performed throughout the history of the Gove Bauxite deposit, the grade and handleability of the ore allow a crude product to be mined and exported. • Bauxite mineralogy has been investigated through numerous studies, primarily using wet chemical techniques, to understand how it will react in the Bayer Process, which is used to extract the alumina at the refineries. • A proprietary mineralogical calculator “MinCalc” is used to estimate bauxite mineralogy and Bayer processing grade for Gove ore from the routinely collected elemental chemistry and thermogravimetry, as routine wet chemical techniques are prohibitively expensive. MinCalc calibration is orebody specific and is validated and recalibrated during the life of mine operations. Environmental factors or assumptions • There are numerous exclusion zones throughout the lease area. The block model has been coded with these exclusion areas for mine planning. • All overburden removed prior to mining is used to rehabilitate the final mining surface. The overburden is benign and only temporarily stockpiled before the whole amount is used in rehabilitation. • There is no floor or bench waste moved during mining of the Gove ore. Bulk density • In situ bulk density is estimated after individual samples are assigned a density based on lithology, which in turn is based on in situ bulk density test work. Classification • The estimate for the 3D model has been classified as Measured. • The estimate for the 2D model has been classified as a Measured, Indicated and Inferred Mineral Resource based on geological characteristics of the deposit, structural continuity (thickness) and drill hole spacing. • Measured Mineral Resource is nominally informed by 50 mN x 50 mE drill hole spacing with up to 100 m in some cases. • Indicated Mineral Resource is informed by drill hole spacing between 200 mN to 200 mE with up to 400 m in some cases. • Inferred Mineral Resource is the areas surrounding the Measured and Indicated Mineral Resource where continuity is expected and thickness >= 1 m. Audits or reviews • A Resources and Reserves internal audit was completed in 2014 by Rio Tinto Group Audit and Assurance on the Gove deposit. This audit concluded with an overall ranking of Marginal, identifying one high audit finding. A list of actions was developed in response to this, all of which have now been closed. Discussion of relative accuracy/ confidence • Confidence in the Mineral Resource estimate is high due to 40 years of successful mining history and 25 years of reconciliation data as well as appropriately spaced drilling (50 m x 50 m grid). SECTION 4 ESTIMATION AND REPORTING OF ORE RESERVES Criteria Commentary Mineral Resource estimate for conversion to • The Ore Reserve estimate was developed using the geological model finalised in November 2017, and the Mineralogy model finalised in August 2019. • No additional drill / assay information was completed / available for inclusion in the 2020 Reserve & Resource estimation.
9 Ore Reserves • Mineral Resources are reported exclusive of Ore Reserves. Site visits • The Ore Reserves Competent Person has been employed by Rio Tinto Aluminium for a significant period and has visited Gove Operations several times in recent years. Study status • Gove Operations has been operating continuously for several decades, and the Ore Reserve estimate and life of mine plan are updated annually. This includes the reconciliation of operating parameters, and review of input assumptions into the planning processes. Cut-off parameters • The Ore Reserve cut-off is based on an economic parameter, summarised as the margin realised upon sale of the bauxite. The economic cut-off approach considers revenue (bonus/penalty), fixed/operating/capital costs, royalties and other third-party payments. Bauxite that satisfies this economic cut-off, is considered for inclusion in the Ore Reserve. Mining factors or assumptions • The Ore Reserve is mined using a shallow, open cut strip mining technique developed over several decades of operations. Once the area is tree cleared and the topsoil/overburden removed, the bauxite is ripped by dozers before being hauled to the crusher for sizing. Several mining areas are active at any one time to enable blending and to mitigate against operational risk. • As the Ore Reserve is shallow, geotechnical risks are extremely low. Stockpile heights and wet road conditions are managed in accordance with standard operating procedures. • Dilution and mining recovery parameters are applied during the Ore Reserve estimation process, based on reconciliation of past performance and reviewed annually. • Minimum bauxite mining thickness of 0.7 m is used for Ore Reserve estimation. • Inferred Mineral Resources are not considered in the estimation of Ore Reserves. • Apart from maintenance workshops to maintain the mining equipment, stores for consumables and water stands there is no other significant infrastructure required with the mining method. Metallurgical factors or assumptions • There is no beneficiation plant at Gove Operations. The bauxite is sized through a primary and secondary crushing system before being stockpiled for shipping. • With no crushing loss, 100% of the bauxite mined is planned to be shipped. • Extractable alumina is calculated through application of a Mineralogy model. Environmental • Gove Operations has obtained all relevant environmental approvals required to continue operations as outlined in the Gove Mine Management Plan extending until 2030. Infrastructure • As Gove Operations is an established site all appropriate infrastructure for the existing operation is already developed. Any infrastructure expansion required in the future is allowed for in the financial modelling that supports the Ore Reserve. • Following curtailment of the Gove refinery in 2014 there exists an infrastructure surplus, which is being scaled down to meet the new demand of the operation. This includes power, water, labour, accommodation, offices, ancillary equipment, buildings, etc. Costs • Operating and sustaining capital costs are sourced from the Gove Operations financial model. • Future capital costs are based on project study estimates or five-year plan sustaining capital amounts. • Traditional owner and carbon tax assumptions are factored into the financial modelling. • Gove closure costs are based on the Gove Closure Order of Magnitude study. • Exchange rates are based on internal Rio Tinto modelling of expected future country exchange rates. Revenue factors • Commodity prices are based on internal Rio Tinto modelling of the future supply and demand balance for bauxite, alumina and aluminium. This includes the bonus and penalty adjustments for quality. • Northern Territory Government royalties are included in the financial modelling at 10.0% of the bauxite price. • Exchange rates are based on internal Rio Tinto modelling of expected future country exchange rates. Market assessment • Industry analysis is undertaken to assess the existing and future supply and demand balances in bauxite, alumina and aluminium annually. • Internal Rio Tinto forecasting revises production guidance on an annual basis. Economic • Operating costs are built up from first principles while capital costs are included based on current estimates. Appropriate escalation is built in where capital costs are to be incurred in the future. • The discount rate to be used in the NPV model is supplied from Rio Tinto corporate and is set based on risk adjusted cost of capital.
10 • Sensitivity analysis is carried out to assess key project drivers and the sensitivity of the project economics to movements in these drivers. Social • The Gove Mine Management Plan outlines the operating conditions agreed to until 2030. • Mining development must receive approval for archaeological and cultural heritage via the NT Heritage Conservation Act and sacred sites (administered by the Aboriginal Areas Protection Authority) receive approval via the NT Aboriginal Sacred Sites Act. Other • The Gove Operations lease agreements are valid through to 2053, including the Special Mineral Lease covering the mine (SML11 parts 1, 2 & 3) and the associated Special Purpose Leases including the new Residue Disposal Area (RDA) lease agreement. • Following curtailment of the Gove Refinery in 2014, Gove Operations no longer produces alumina or hydrate, only a bauxite product. Marketing arrangements have changed accordingly to enable this transition. • Statutory requirements are managed through the Gove Mine Management Plan. Classification • Given the high level of confidence in the reserve modifying factors, all Measured Resources were converted to Proved Ore Reserves and all Indicated Resources were converted to Probable Ore Reserves. • No Probable Reserves have been derived from Measured Resources. • Inferred Mineral Resources are not considered in the estimation of Ore Reserves. • The Competent Person is satisfied that the current classification is reasonable for the Gove Ore Reserve. Audits or reviews • A Resources and Reserves internal audit was completed in 2014 by Rio Tinto Group Audit and Assurance on the Gove deposit. This audit concluded with an overall ranking of Marginal, identifying one high audit finding. A list of actions was developed in response to this, all of which have now been closed.
Notice to ASX Page 1 of 2 Our approach to climate change 2020 17 February 2021 Attached is the Rio Tinto climate report, ‘Our Approach to Climate Change 2020’. The report is also available at www.riotinto.com/climatereport. EXHIBIT 99.7
Page 2 of 2 Contacts media.enquiries@riotinto.com riotinto.com Follow @RioTinto on Twitter Media Relations, United Kingdom Illtud Harri M +44 7920 503 600 David Outhwaite T +44 20 7781 1623 M +44 7787 597 493 Media Relations, Americas Matthew Klar T +1 514 608 4429 Media Relations, Asia Grant Donald T +65 6679 9290 M +65 9722 6028 Media Relations, Australia Jonathan Rose T +61 3 9283 3088 M +61 447 028 913 Matt Chambers T +61 3 9283 3087 M +61 433 525 739 Jesse Riseborough T +61 8 6211 6013 M +61 436 653 412 Investor Relations, United Kingdom Menno Sanderse T: +44 20 7781 1517 M: +44 7825 195 178 David Ovington T +44 20 7781 2051 M +44 7920 010 978 Clare Peever M: +44 7788 967 877 Investor Relations, Australia Natalie Worley T +61 3 9283 3063 M +61 409 210 462 Amar Jambaa T +61 3 9283 3627 M +61 472 865 948 Group Company Secretary Steve Allen Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885 Joint Company Secretary Tim Paine Rio Tinto Limited Level 7, 360 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404 This announcement is authorised for release to the market by Rio Tinto’s Group Company Secretary.
Our Approach to Climate Change 2020
riotinto.com Foreword – Chief Executive 3 Introduction - Group Executive, Strategy & Development 4 Our Business at a Glance 6 Our Position on Climate Change 7 Progress on Our Climate Change Strategy 8 1 Producing Materials Essential for a Low-carbon Future 11 2 Reducing the Carbon Footprint of Our Operations 23 3 Partnering to Reduce the Carbon Footprint Across Our Value Chains 35 4 Enhancing Our Resilience to Physical Climate Risk 47 Governance 50 CA100+ Net Zero Company Benchmark Disclosures 57 Emissions and Energy Data 62 2020 HighlightsContents Scope 1 & 2 targets Scope 3 goals Cover image: Our aluminium business in Canada uses clean, renewable hydro-power. Inside cover image: Acacia and eucalyptus tree rehabilitation area at QIT Madagascar Minerals. Reduced emissions by 1.1Mt CO 2 e relative to our 2018 baseline Committed $4.5m to extend the Tsinghua-Rio Tinto Joint Research Centre for Resources, Energy and Sustainable Development over the next five years Started work on a $98 million 34 MW solar plant at our Gudai-Darri iron ore mine Committed $10m to advance our climate partnership with China Baowu Steel Group and Tsinghua University to help address the steel industry’s carbon footprint Evaluated 44 projects with potential abatement of 6.9Mt CO 2 e by 2030 Signed a Memorandum of Understanding (MoU) with Nippon Steel Corporation to jointly explore low- carbon technologies for the steel value chain Approved spend of over $140m on climate-related projects Our ELYSIS partnership completed construction of the first industrial pilot facility to scale up the breakthrough zero-carbon aluminium technology 1Our Approach to Climate Change
As pioneers in mining and metals, we produce materials essential to human progress. 3Our Approach to Climate Change2 Our Approach to Climate Change We Are Well Positioned for a Low-carbon Future Today more than ever, we know that addressing climate change effectively requires businesses, governments and society to work together. Similarly, every part of our company needs to embrace this challenge: progress against our targets will come from many projects across our business and collaboration with our partners. In 2018, we divested the last of our coal businesses and no longer extract fossil fuels. Today, our portfolio is well positioned for the transition to a low-carbon future. However, we operate in value chains with large carbon footprints. We recognise the role we play, and understand that significant, concerted effort will be needed to reach net zero carbon emissions by 2050. Last year, we announced new 2030 targets: to reduce our absolute emissions by 15% and our emissions intensity by 30% relative to our 2018 baseline. These targets are consistent with a 45% reduction in absolute emissions, relative to 2010 levels, and the Intergovernmental Panel on Climate Change (IPCC) pathways to 1.5°C. They are supported by our commitment to spend approximately $1 billion on emissions reduction initiatives over the first five years of the ten-year target period. I am pleased with the progress we have made against our climate change strategy over the past year. This report provides more details on our plans and actions to meet our Scope 1 and 2 targets as well as on the partnerships we are developing to progress Scope 3 goals. With a strong focus on execution, we are also introducing a more explicit link between executive remuneration and our climate change goals and targets. In many important applications, there are no low-carbon alternatives to steel, aluminium and copper; furthermore, these materials are essential to enable the low-carbon transition. The challenge is to produce them sustainably – not only with lower emissions, but also in a way that respects communities. I am personally committed to ensuring that Rio Tinto plays its part. Jakob Stausholm Chief Executive Foreword – Jakob Stausholm, Chief Executive
1 2 3 4 Aligned With Our Strategic Thinking Our climate change strategy Our climate change strategy is aligned with the goals of the Paris Agreement. Climate change considerations are fully integrated into our strategic and operational decision-making and our approach is supported by strong governance, processes and capabilities. This report, our third in line with the recommendations of the Task Force on Climate-related Financial Disclosures (TCFD), details progress against the four pillars of our climate change strategy: Producing materials essential for a low-carbon future Reducing the carbon footprint of our operations Partnering to reduce the carbon footprint across our value chains Enhancing our resilience to physical climate risks Climate risks and opportunities have been part of our strategic thinking, including on capital allocation, for more than two decades. We test our portfolio against a range of integrated strategic scenarios, each capturing alternative climate change narratives and assumptions. Our most recent analysis, conducted in 2020, indicates that the diversity of our portfolio strengthens our overall resilience, including in a scenario aligned with the goals of the Paris Agreement. Most of our assets already sit in the low end of their respective carbon intensity curves and 75% of the electricity used at our managed operations is from renewable sources. In 2020, we started the transition to renewable energy in the Pilbara with the approval of the $98 million, 34MW solar plant at Gudai-Darri and 45MW battery system at Tom Price. Our approved spend on climate-related projects in 2020 were over $140 million of the total $1 billion committed over the period 2020 to 2024. Since 2018, we have reduced Scope 1 and 2 emissions by 1.1Mt CO 2 e, or 3%, which is on track with our 2030 target for absolute emissions. However, in 2020, our emissions remained at the same level as in 2019 at 31.5Mt CO 2 e. We expect progress on emissions to accelerate later in our 2030 target period as we develop and implement our mitigation projects, studies and R&D. Over the past year we have further developed our asset-by-asset decarbonisation roadmaps and started work on mitigation projects, with a particular focus on renewables, process heat and ways to replace diesel fuel in our mobile fleets and rail networks. These roadmaps and actions are owned by our product groups and are fully integrated into our annual business planning process, with support and co-ordination from our Energy and Climate Change Centre of Excellence. In 2020, we also continued to develop technology solutions to meet our mid- to long-term ambitions. Partnerships In late 2020, China, Japan and South Korea joined the European Union to set net zero or carbon neutral ambitions within a 2050-2060 timeframe. Together, these countries account for over 70% of our sales and around 90% of our value chain emissions (Scope 3) from our key products, including iron ore and aluminium. We have updated our methodology for calculating Scope 3 emissions which we estimated to be 519Mt CO 2 e in 2020 (see our Scope 1, 2 and 3 emissions calculation methodology report for further details). We continue to explore collective solutions across our value chain and we have this year defined a series of measurable and impactful Scope 3 emissions reduction goals to guide our partnership approach. With about 80% of our Scope 3 emissions from our customers’ hard-to- abate processes, our Scope 3 goals are mostly focused on our contribution to the development and deployment of low-carbon technologies, as well as the emissions from shipping our products. Our Scope 3 goals are to: – Work in partnerships with customers on steel decarbonisation pathways and invest in technologies that could deliver reductions in steelmaking carbon intensity of at least 30% from 2030; – Work in partnerships to develop breakthrough technologies with potential to deliver carbon neutral steelmaking pathways by 2050; – Work in partnerships to develop breakthrough technology enabling the production of zero-carbon aluminium; – Meet our ambition to reach net zero emissions from shipping of our products by 2050. We have made significant progress in our value chain climate partnerships in 2020. We have further advanced our partnership with China Baowu Steel Group and Tsinghua University and committed $10 million to fund the joint establishment of a Low Carbon Raw Materials Preparation R&D Centre, supporting Baowu’s ambition to peak its carbon emissions by 2023, cut carbon emissions by 30% by 2035 and achieve carbon neutrality by 2050. We also signed a new Memorandum of Understanding with Nippon Steel Corporation to jointly explore technologies to transition to a low-carbon emission steel value chain. And our ELYSIS joint venture with Alcoa achieved a new milestone in the scaling up of a breakthrough technology that eliminates all direct greenhouse gas emissions from the aluminium smelting process by completing construction of the first industrial pilot facility in Canada. In 2021, we will continue to execute our climate strategy, working in partnership with other businesses, technology developers, investors, consumers and civil society. We also recognise the essential role of governments around the world to create the legal and regulatory certainty and incentives necessary for investment and innovation. We believe the best solutions will come from partnerships and global collaboration. Peter Toth Group Executive, Strategy & Development Introduction – Peter Toth, Group Executive, Strategy & Development Introduction – Peter Toth, Group Executive, Strategy & Development 4 5Our Approach to Climate Change Our Approach to Climate Change
Our purpose is to produce materials essential to human progress. Materials such as aluminium used in electric vehicles, copper used to build wind turbines and iron ore used to create critical infrastructure. We work in 36 countries, operating mines, smelters, refineries and processing plants. Gross revenue Our Position on Climate Change Our Business at a Glance Our Business at a Glance Our key assets are located in close proximity to our major markets. Consolidated sales revenue by destination: China: 58.1% Asia*: 10.2% United States of America: 10.9% Japan: 7.5% Europe: 5.9% Other: 7.4% * excluding China and Japan Our Position on Climate Change Iron Ore Aluminium Copper & Diamonds Energy & Minerals Mines 16 4 5 6 Smelters – 14 1 – Processing plants & refineries – 4 – 7 Mt CO 2 emissions 3.0 21.8 2.7 3.6 Rio Tinto share of production Iron ore 275.5Mt (2019: 270.7Mt) Bauxite 56.1Mt (2019: 55.1Mt) Aluminium 3,180kt (2019: 3,171kt) Mined copper 528kt (2019: 577kt) Titanium dioxide slag 1,120kt (2019: 1,206kt) Underlying EBITDA $18.8bn (2019: $16.1bn) $2.2bn (2019: $2.3bn) $2.2bn (2019: $2.1bn) $1.6bn (2019: $1.8bn) We accept the mainstream climate science assessed by the Intergovernmental Panel on Climate Change. We support the Paris Agreement and ambitions to reach net zero by 2050. We acknowledge that business has a role to play in addressing and managing the risks and uncertainties of climate change. We do not advocate for policies that undermine the Paris Agreement or discount Nationally Determined Contributions (NDCs). We recognise the importance of adaptation and resilience to a changing climate. Where climate policies are implemented, we support the use of market mechanisms, including for carbon prices. We believe that effective climate policies should incentivise the private sector to invest in low-carbon technology while maintaining the competitiveness of trade-exposed industries. We promote our climate and energy policy positions in discussions with our industry associations. Iron Ore $27.5bn Aluminium $9.3bn Copper & Diamonds $5.4bn Energy & Minerals $5.0bn 6 7Our Approach to Climate Change Our Approach to Climate Change
Progress on Our Climate Change Strategy Progress on Our Climate Change Strategy 1 Producing materials essential for a low-carbon future 2 Reducing the carbon footprint of our operations 3 Partnering to reduce the carbon footprint across our value chains 4 Enhancing our resilience to physical climate risks 2000 2005 2010 2015 2020 2025 2030 2040 2050 Early portfolio restructure Scope 1 & 2 targets aligned with the Paris Agreement Net zero operations by 2050 Net zero shipping by 2050 Industry leading value chain partnerships Physical risks Strategic thinking Integrated scenarios, including a range of climate change narratives, used to frame and stress-test our Group strategy and portfolio Focus on materials essential for low-carbon future 39% reduction in absolute emissions since 2010 across our managed operations Mobile diesel and process technology breakthroughs Internal carbon prices and climate change considerations in investment decisions for over two decades ELYSIS Renewables and process heat Baowu/Tsinghua Nippon Steel Scope 3 goals across aluminium and steel value chains and shipping of our products Asset level resilience, Critical Risk Assessments Desktop reviews & case studies, climate modelling Integrated approach Exit of coal businesses The four pillars of our climate change strategy Progress on Our Climate Change Strategy 8 9Our Approach to Climate Change Our Approach to Climate Change
Iron ore Used in steel as a fundamental building block of energy-efficient urban centres and infrastructure Aluminium Essential for light weighting of fuel-efficient transport solutions and infinitely recyclable Copper Essential to electrification of low-carbon economy and transport due to superior conductivity Minerals Essential for the development of electric vehicles and battery storage, supporting renewable energy Our portfolio is positioned for a low-carbon future The global ambition on climate change as articulated by the Paris Agreement and corresponding national net zero emissions goals is clear. However, translating commitments into meaningful outcomes will require unprecedented effort and co-operation between businesses, consumers, governments and investors. We believe that we can be part of the solution both globally and regionally, and that our portfolio is well positioned to meet the demands of building a low-carbon economy. We have considered climate change in our strategic thinking and investment decisions for over two decades. We continually test our portfolio for further threats and opportunities from climate change. The pace and shape of global decarbonisation remain highly uncertain, which is why we consider a range of scenarios capturing potential transition pathways. We do this through the use of a comprehensive and robust scenario framework, which is fully integrated into our corporate strategy. Although the pathway to a global low-carbon economy is not fully defined today, we believe it will require: 1. The decoupling of economic growth and energy demand; 2. A transition away from fossil fuels as the main energy source; 3. Electrification of homes, industries and transport, supported by new technologies, a growing renewable power base and the use of hydrogen; 4. The deployment of carbon removal projects, including nature-based solutions; 5. Increased material efficiencies, re-use and recycling, ie the circular economy. Producing Materials Essential for a Low-carbon Future 1 Copper is essential to the electrification of a low-carbon economy and transport due to superior conductivity. 11Our Approach to Climate Change10 Our Approach to Climate Change
Our Approach to Scenarios We do not run separate standalone climate scenarios but instead have distinct climate change analyses embedded within the global scenarios framing our strategic thinking. Climate change considerations are therefore fully integrated, together with other business issues, in our Group strategy and portfolio decisions. Together with overarching demographic megatrends, the interplay between our three scenario forces drives future global economic growth and trade pathways. Geopolitics, society and technology are also fundamental forces shaping the global response to the climate change challenge, including the global energy transition. Future outcomes will depend on how climate change ambitions and expectations translate into changing societal behaviours and consumer choices. The future cost of traditional and low-carbon solutions will be key factors informing those choices. Technology innovations have a key role to play in shaping the transition to a low-carbon economy, especially in hard-to-abate sectors such as steel and aluminium. These drivers will in turn be dependent on the level of co-ordination within the global geopolitical context, especially on key enabling policies such as carbon pricing. How these dynamics play out over long timeframes is uncertain, especially under the current context of additional complexities from the COVID-19 pandemic. This is why we are exploring these uncertainties through three scenarios and their intersections, with each combining aspects of the three global forces, but drawing on a dominant feature. Our strategic thinking and scenario-planning are structured around three global forces: geopolitics, society and technology. We use global scenarios in our strategy and capital allocation processes to stress test our portfolio and investment decisions under alternative macroeconomic settings and commodity outlooks. Our scenario approach is reviewed every year as part of our Group strategy engagement with the Board. It informs our effort to build a strong and resilient business as well as leverage new trends and opportunities. Technology 4.0 Technology revolution transforms the global economy Global productivity boost but sustained inequalities >2°C Realpolitik 2.0 Global fragmentation impacts trade and growth Structural tension and competition between US and China >3°C Society 3.0 Societies mobilise around common global challenges High level of global collaboration and policy co-ordination <2°C Producing Materials Essential for a Low-carbon FutureProducing Materials Essential for a Low-carbon Future 45 2000 2010 2020 2030 2040 2050 10 20 15 5 0 25 30 35 40 Global carbon emissions1 (Gt CO 2 ) 1. Excludes net carbon emissions from land use change (LUC) In Realpolitik 2.0, a further fragmentation of the world order, driven by strong populist and nationalistic tendencies, holds back trade and global action on climate. The undermining of global institutions and lack of policy incentives slow investment in low-carbon technologies. Even with a sustained weak macro- economic environment, global emissions quickly return to pre-pandemic levels and continue to grow. Carbon prices range from $0-30 per tonne of CO 2 and global warming is on a path to reach or even exceed 3°C by 2100. In contrast, strong global collaboration between governments and businesses accelerates the energy transition in our Society 3.0 scenario. Improved co-ordination of climate policies across countries results in high and rising carbon prices (up to $130 per tonne of CO 2 by 2040), supporting early deployment of new technologies. Despite stronger economic growth in low- income countries, global emissions peak and start to decline early, before turning net-negative during the second half of the century, to meet the Paris goal of keeping global temperature increases below 2°C. The fast roll-out of innovation in our Technology 4.0 scenario provides both a strong boost to global economic productivity and decarbonisation efforts. However, global climate policies remain only loosely co-ordinated, with carbon prices of $15-30 per tonne of CO 2 across most countries by 2030, and the energy transition mostly led by the private sector. The development of wind and solar capacity and penetration of electric vehicles are strongest in this scenario but without adequate policy support it takes longer for global emissions to peak, and the decline is insufficient to keep global warming below 2°C by 2100. Realpolitik 2.0 Technology 4.0Society 3.0 12 13Our Approach to Climate Change Our Approach to Climate Change
Realpolitik 2.0 assumptions Global GDP growth (PPP) 2.4% per annum to 2050 Energy intensity of global GDP -1.8% per annum to 2050 Carbon intensity of total energy -0.1% per annum to 2050 Carbon prices Flat prices within $0 to $30/tCO 2 e range across regions Global temperature increase by 2100 >3 °C Society 3.0 assumptions Global GDP growth (PPP) 3.6% per annum to 2050 Energy intensity of global GDP -3.5% per annum to 2050 Carbon intensity of total energy -2.1% per annum to 2050 Carbon prices Prices rise to $25-80/tCO 2 e range by 2030 and $60-130/tCO 2 e by 2050 Global temperature increase by 2100 <2 °C Realpolitik 2.0 Society 3.0 Global macro summary Realpolitik 2.0 builds on keys themes that have defined the global geopolitical context in recent years: an erosion of global trust in elites and institutions, a backlash in some quarters against globalisation and a shift in western relationships with China. This scenario considers the implications of a further fragmentation of the world order with global institutions growing increasingly weak in the face of strong nationalistic and populist forces, including structural competitive tensions between the US and China. Realpolitik 2.0 is our scenario with the lowest economic growth outlook, with global GDP growth of just 2.4% per annum to 2050, compared to around 3.7% since the start of the century. Climate change In addition to the negative impact on trade and growth, the undermining of global collaboration in Realpolitik 2.0 provides headwinds to the co-ordination of policies, such as carbon pricing, and investment in new technologies. Proactive action on climate falls well short of stated ambitions and the energy transition unfolds at a slow pace. Reductions in global energy intensity are weakest in this scenario and solar and wind renewables still only account for less than 30% of global electricity production by 2050. After a quick return to pre-pandemic levels, global emissions continue to grow, before slowly starting to plateau from the late 2030s. We would therefore expect global temperatures in Realpolitik 2.0 to be on a trajectory to reach or even exceed a 3°C increase by 2100. Global macro summary As the world turns to the rebuilding of the global economy after the COVID-19 pandemic, governments are facing growing calls for a new social contract. In Society 3.0, global expectation for social equality, fairness and sustainability becomes the dominant force. In this scenario governments, businesses and society mobilise to work together on solving global challenges such as climate change. Global institutions adapt to better reflect the new global balance of power between the United States and China, allowing for a better co-ordination of efforts and policies. Collaboration also benefits trade and an accelerated development of lowest income economies, supporting global GDP growth in excess of 3.5% per annum to 2050. Climate change Government policy is central to delivering early and meaningful action on climate in our Society 3.0 scenario. Carbon prices in developed economies rapidly escalate during the 2020s, with catch-up from other regions in subsequent decades as overall prices continue to rise. This in turn brings forward economic cross-over points for new low-carbon technologies, accelerating the energy transition. Society 3.0 also sees the emergence of more developed circular economy systems and a wider sharing economy (post pandemic), resulting in the strongest decoupling between economic growth and energy demand across all our scenarios. Not surprisingly global emissions peak and start to decline early in this scenario, but need to turn net-negative in the second half of the century to follow a trajectory in line with the Paris goal of keeping future temperature increases below 2°C. Implications for commodities Weak economic growth weighs on the demand outlook for all commodities in Realpolitik 2.0. Demand for copper is the most resilient, despite the slower penetration of metal-intensive low-carbon technologies, as electrification of developing economies continues. Without policy and infrastructure support the sale of electric vehicles grows at a moderate pace, still accounting for less than 40% of global car sales by 2050. This provides a less supportive demand environment for battery minerals such as lithium or nickel. Instead, aluminium continues to benefit from further light-weighting of the still large, fuel-based, global car fleet. In iron ore, air quality concerns and a focus on blast furnace energy efficiency favour high-grade feedstocks, but in the absence of a deeper transformation of steelmaking processes this does not translate into significant changes to the relative value-in-use of different iron ore products and grades. Given the more rapid increase in global temperatures, the physical impacts from climate change are expected to intensify in this scenario. This has the potential to occasionally disrupt mine supply and logistic chains, resulting in additional volatility across commodity markets. Implications for commodities The demand outlook is fairly divided across commodities in Society 3.0. While materials such as copper do well, benefiting from the fast electrification of end-use sectors, others such as steel and iron ore face some headwinds from a more developed circular economy. The share of electric vehicle sales grows rapidly, reaching around 70% by 2050, but with the overall size of the global vehicle fleet negatively impacted by strong gains in shared mobility. Higher carbon prices encourage the collection and recovery of recycled material, making Society 3.0 our only scenario where the average use of scrap for aluminium, copper and steel exceeds 50% by 2050, up from about one third today. The resulting negative impact on primary demand is particularly felt in the lower quality segment of the iron ore market, while higher-grade feedstocks are increasingly sought after by steelmakers to align with the needs of their decarbonisation technology pathways. Carbon prices and stronger environmental standards are expected to increase mining and processing costs in this scenario, while stricter and longer approval processes slow down the development of new supply, especially for greenfield projects. 60% 0% 0% 2010 20102020 20202030 20302040 20402050 2050 10% 20% 30% 40% 50% 70% 10% 20% 30% 40% 50% 60% Solar and wind share of global power generation capacity Average share of global scrap use across aluminium, copper and steel Society 3.0 Society 3.0 Realpolitik 2.0 Technology 4.0 Producing Materials Essential for a Low-carbon Future Producing Materials Essential for a Low-carbon Future 14 15Our Approach to Climate Change Our Approach to Climate Change
As a diversified global mining company, we consider a broad range of metals and minerals in the development of our portfolio and growth strategies. We aim to invest in commodities with an attractive industry structure. Our assessment is based on a series of demand and supply criteria such as barriers to entry, cash cost curves and capital intensities, grade and depletion trends, end-use sectors’ outlook and substitution threats. Commodities with attractive industry structures tend to have a combination of high barriers to entry, steep cash cost curves and strong demand growth potential. Industries with such characteristics offer attractive margins, in particular for low-cost producers like us operating Tier 1 assets. Industry structures are dynamic and evolve over time under the influence of megatrends. The development of China over the past two decades, with rapid urbanisation and industrialisation, has upended the commodity sector. Iron ore has benefited most from this transformation and has one of the strongest industry structures in our sector today. Our scenario analysis points to potential future shifts in both absolute and relative industry structure attractiveness in the future. For most commodities, industry attractiveness would come under pressure in Realpolitik 2.0 given the lower economic growth and flatter cash cost curves. Coal would face less pressure than currently expected as the energy transition unfolds at a much slower pace. The biggest relative shifts are anticipated in our Society 3.0 scenario, with demand dynamics strongly benefiting copper, battery minerals and other materials that support the electrification of the energy system. Steeper cost curves make hydro-based aluminium more profitable, but the higher use of steel scrap dampening the iron ore industry structure, with a stronger impact felt on lower-grade market segments. Conversely, our analysis shows more stable industry structures in the Technology 4.0 scenario. Finally, at a commodity level, copper presents the most resilient and attractive industry structure across the three scenarios. Technology 4.0 assumptions Global GDP growth (PPP) 4.1% per annum to 2050 Energy intensity of global GDP -3.0% per annum to 2050 Carbon intensity of total energy -1.4% per annum to 2050 Carbon prices Prices rise to $15-30/tCO 2 e range by 2030 across regions Global temperature increase by 2100 >2 °C Technology 4.0 Global macro summary Digital connectivity has been a defining feature of how the world adapted to life during the global pandemic. Investment and adoption rates in digital communication tools have leapt forward, upending traditional ways of working. Our Technology 4.0 scenario projects this trend to a next level, with fast-paced digitisation and innovation sustained across all sectors, providing a boost to global economic productivity. Global GDP growth is strongest in this scenario, exceeding 4% per annum to 2050. But, the creation of wealth remains unevenly distributed, both within and between countries, and with only loosely co-ordinated policies across governments. Instead, the deep economic transformation that is taking place in Technology 4.0 is mostly led by the private sector with some government support. Climate change Despite reductions in energy intensities, strong economic growth makes Technology 4.0 our scenario with the highest level of total energy demand by 2050. Cost improvements in low-carbon technologies such as renewables, batteries or hydrogen electrolysers are also strongest in this scenario. This is driving a high level of solar and wind power capacity development. But weak climate policy co-ordination and only moderate increases in carbon prices are not supportive of a faster energy transition, especially in less developed economies. Without stronger policy support, it therefore takes longer for global emissions to peak in Technology 4.0. And the decline which starts picking up pace in the early 2030’s is not sufficient to keep increases in global temperatures below 2°C by 2100. Implications for commodities Technology 4.0 is the most supportive scenario for future demand across all commodities, both from strong economic growth and the high level of investment in low-carbon technologies. In addition to high solar and wind capacity, this scenario also has the largest fleet of electric vehicles, with close to 80% of global car sales being electric by 2050. Together with battery minerals, copper particularly benefits from these trends given its intensity of use in low-carbon technologies is about four times that of coal or gas generation and combustion engine cars. Meanwhile, steel and aluminium remain essential to the development of all supporting infrastructure and urbanisation. New manufacturing processes, such as 3D printing, reduce material waste, but the overall impact of scrap usage on primary demand for aluminium, copper and iron ore is weakest in this scenario. Cost reductions in Technology 4.0 are also expected to extend to the mining sector, with benefits from lower power costs and improved productivity through better use of data and analytics. Improved processing would also lead to higher ore recoveries from orebodies as well as tailings. 100% 0% 2010 2020 2030 2040 2050 20% 40% 60% 80% Electric vehicles’ share of global car sales Technology 4.0 Realpolitik 2.0 Implications for Industry Structure Scenario commodity implications More attractive In d u st ry s tr u ct u re Current Technology 4.0 Society 3.0 Realpolitik 2.0 Less attractive 1. BM = Battery Minerals 2. IM = Industrial Minerals 3. TC = Thermal Coal Producing Materials Essential for a Low-carbon Future Fe Cu BM1 IM2 Al TC3 Producing Materials Essential for a Low-carbon Future Our scenarios and 1.5°C Our Society 3.0 scenario is consistent with temperature increases of less than 2°C, but does not meet the stretch goal of the Paris Agreement to limit warming to 1.5°C. For the world to be on a 1.5C pathway, global CO 2 emissions would need to fall by 45% from 2010 levels by 2030, before reaching net zero by 2050. Rising social expectation for climate action is driving a growing number of countries to commit to net zero emissions by mid-century. China’s recent pledge for carbon neutrality by 2060 and the US intention to re-join the Paris Agreement confirm renewed global momentum. Our operational emissions targets and long-term ambition are also consistent with a 1.5C pathway. However, the IEA estimates that even if all announced 2050 net zero commitments are reached, global CO 2 emissions would still only get to net zero by 2070. To bring this forward to 2050, the IEA new NZE2050 scenario shows that the primary energy intensity of global GDP would need to fall by 4.5% each year to 2030, the electricity share of final energy demand would need to rise to 28% by 2030 and emissions from the power sector fall by 60% over the same period. This would represent a much faster energy transition than is assumed in our scenarios over the next decade, requiring a high level of co-ordination in climate policies across sectors and countries. It would also mean stronger demand for commodities such as copper or battery minerals that are critical to the accelerated deployment of solar and wind renewables or electric vehicles. We continue to monitor alternative scenarios including ones that limit warming to 1.5°C. Our analysis shows that our portfolio is well positioned to perform strongly under faster low-carbon transitions than we are seeing today. 16 17Our Approach to Climate Change Our Approach to Climate Change
Implications for Our Portfolio Climate change presents a range of risks as well as opportunities for our portfolio. Physical risks are covered by the fourth pillar of our climate change strategy focusing on adaptation and the resilience of our assets. These risks are expected to increase over time, with higher probabilities of more extreme events in scenarios such as Realpolitik 2.0, in which climate action is delayed. We focus here on financial risks and opportunities from the transition to a low-carbon economy. The implications of our scenarios are closely linked to the value chain emissions – or Scope 3 risks – associated with each commodity. To represent these risks we classify commodities into five categories based on: – whether or not carbon is embedded within the product sold; – the carbon intensity of the downstream processing steps; and – the short, medium and long-term substitution risks from potential decarbonisation pathways across the value chain. Classifying our products Rio Tinto products Type 5 Type 4 Type 3 Type 2 Type 1 Carbon in product sold and widely substitutable today Carbon in product sold but hard to substitute today No carbon in product sold but CO 2 intensive processing today No carbon in product sold and best-in-class process CO 2 intensity today No carbon in product sold, low process CO 2 intensity and critical enabler of low- carbon future Scope 3 reductions through portfolio mix changes and depletion of reservoirs/reserves Scope 3 reduction through customer deployment of CCS/U Scope 3 reduction is result of customer technology breakthrough and/or power grid decarbonisation Scope 3 reduction is result of customer technology breakthrough Limited scope 3 emissions and risk Thermal coal, oil and gas Metallurgical coal Iron ore fines & lump, bauxite & alumina for coal-based aluminium Iron ore DR pellets, bauxite & alumina for hydro-based aluminium, high- grade TiO2 Copper, aluminium, battery minerals Substitution with renewables (short-term) Hydrogen substitution risk (long-term) Scrap substitution risk and preference for high-grade products Substitution risk limited by scarcity of high-grade products Scrap substitution risk limited by scrap quality and availability Lo w er S co p e 1 & 2 r is k Lower Scope 3 riskLower Scope 3 riskHigher Scope 3 risk Producing Materials Essential for a Low-carbon Future We believe our portfolio is well positioned across both the value chain and operational transition risk dimensions. In fact, over 95% of our Group revenues are from assets with favourable operational carbon intensities and outside high Scope 3 risks categories. Approximately 22% of our revenues also currently sit in the lowest carbon segment of our framework – this is where we direct over 90% of our growth capital today. The favourable positions for most of our assets on both industry cash cost and carbon intensity curves strengthen our businesses’ truly Tier 1 status, not just today but also in a low-carbon future. Our analysis shows that our portfolio is resilient to climate change both in absolute as well as relative terms, compared to other companies in our sector. Beyond resilience, the optionality of our assets and products offers a wide range of opportunities across our scenarios. Overall, our portfolio is expected to perform more strongly in scenarios with proactive climate action. Thermal coal and copper sit at the two extreme ends of this classification. Coal faces significant short-term transition risks while in the short, medium and longer term copper is a critical enabler of a low-carbon future, with carbon savings from the electrification of the energy system far exceeding the carbon dioxide emitted during the copper mining and processing stages. The direct carbon footprint of our operations and the potential introduction of climate policies is another transition risk for our portfolio. Overall, even the most carbon-intensive assets in our portfolio tend to compare favourably against the rest of the industry, with two exceptions: Richards Bay Minerals, which relies on a predominantly coal-based power grid in South Africa, and our coal-based Boyne and Tomago aluminium smelters on the east coast of Australia. These assets account for less than 5% of the Group’s revenues. Our portfolio is well positioned for the low-carbon transition Classifying our revenue, growth capex and operating assets by product type Percentage share of Group: Revenue (%) Growth capex* (%) Operating assets (%) * excludes sustaining and replacement capex 2% – 1% From coal-based aluminium smelters 22% 93% 46% From all copper assets, hydro-based aluminium smelters 1% – 3% From RBM 9% 4% 9% From IOC, RTFT, CBG, other 0% 66% 3% 42% From RTIO, Amrun, Pacific alumina assets 0% 0% 0% 0% Type 5 Type 4 Type 3 Type 2 Type 1 High transition risks (not in our portfolio) Producing Materials Essential for a Low-carbon Future IOC: Iron Ore Company of Canada (high-grade iron ore pellets, high-grade concentrate) RTFT: Rio Tinto Fer et Titane (Sorel-Tracy Quebec metallurgical complex produce iron & titanium with materials from QMM) QMM: QIT Madagascar Minerals (based in south eastern Madagascar, produces ilmenite, rutile, zircon) MRN: Bauxite mine in Brazil (joint venture) Alumar: Alumina refinery in Sao Luis Brazil (joint venture) CBG: Compagnie des Bauxites de Guinée (joint venture) 18 19Our Approach to Climate Change Our Approach to Climate Change
Our operations’ decarbonisation targets and ambition to reach net zero emissions by 2050 are consistent with the goals of the Paris Agreement. However, we also recognise that the pace of decarbonisation across the global economy is uncertain and that current climate policies in many countries are not yet aligned with stated ambitions. These policy uncertainties are captured in our scenario analysis, which in turn informs the central case carbon price assumptions used in our internal investment evaluations and accounting judgements. In addition, our scenario approach allows us to test the resilience of our investment decisions against a set of economic and carbon price assumptions that are Paris-aligned. 1. Our scenario analysis In Realpolitik 2.0, carbon prices are assumed to remain near current levels, ranging from $0/tCO 2 for low-income economies to $30/tCO 2 in Europe. In Technology 4.0, carbon prices escalate to a $15-30/tCO 2 range by 2030 across most countries, including China. In Society 3.0, carbon prices rise rapidly to around $40/tCO 2 by 2025 in all developed economies and $130/tCO 2 by 2040, with pricing in developing economies reaching around half those levels. 2. Our internal central case price forecasts We have used an internal price on carbon for our investment evaluations and decisions since 1998. We have distinct price forecasts for the regions and main markets in which we operate and sell our products. Our central case carbon prices are set by our Economics team and informed by our scenario analysis. As only one of the scenarios is aligned with the goals of the Paris Agreement, our central case carbon prices are not consistent with the expectation of climate policies required to accelerate the global transition to meet those goals. Our carbon price assumptions are used in combination with internally consistent sets of commodity prices in our evaluation processes. Those central case prices (including carbon) are used pervasively in our financial processes from budgeting, forecasting, capital allocation and project evaluation to the determination of Ore Reserves. In turn these prices are used to derive critical accounting estimates including as inputs to impairment testing, estimation of remaining economic life for units of production depreciation and discounting closure and rehabilitation provisions. Producing Materials Essential for a Low-carbon Future Our Portfolio Risks and Opportunities Type 5 Technology 4.0 Society 3.0 Realpolitik 2.0 Overall Iron ore IOC well positioned for early deployment of new green steel technologies Opportunities to target direct reduction ores at Simandou Strong resilience from Pilbara, IOC and Simandou high-grade products Potential pressure on lower-grade Robe or SP10 products Overall margin pressures from lower iron ore demand Greater resilience of low-cost Tier 1 Pilbara iron ore asset and blend product Portfolio of iron ore assets and products provide optionality and resilience Aluminium Opportunities from ELYSIS™ technology Potential opportunities to re-power PacAl assets Value upside for hydro-based smelters Increased pressure on coal-based PacAl assets Limited changes to current relative positioning of hydro and coal based smelters Strong relative sector performance from low-cost hydro power and ELYSIS™ Copper Growth opportunities, including from re-processing of legacy copper tailings Growth opportunities but potential environmental approval constraints for greenfield projects Increased value of gold by-products across our copper assets Focus on growth across all scenarios Minerals Strong market outlook for Jadar lithium project Upside from recovery of critical minerals from existing orebodies Strong market outlook for Jadar lithium project Resilience from high-grade TiO 2 operations Reduced battery minerals opportunities Optionality from late-cycle and tech-critical commodities Group $23.9bn 2020 Underlying EBITDA Highest Group portfolio value Resilient Group portfolio value Lowest Group portfolio value Stronger performance of our portfolio in scenarios with proactive climate action Our approach to carbon pricing Producing Materials Essential for a Low-carbon Future Opportunity Risk Neutral 20 Our Approach to Climate Change 21Our Approach to Climate Change
Emissions pathways (indexed to 2010 = 100) In 2020, we set an ambition to reach net zero carbon emissions across our operations by 2050. We also committed to a 15% reduction in absolute Scope 1 and 2 emissions compared to a 2018 equity baseline, and a 30% reduction in emissions intensity by 2030. Our growth between now and 2030 will be carbon neutral overall. Our carbon reduction performance to date and 2030 targets are aligned with goals of the Paris Agreement. By 2030, our managed emissions are expected to be 45% below their 2010 levels, consistent with the pathways highlighted by the IPCC’s in the Special Report on 1.5°C. The more we progress along our decarbonisation journey, the more challenging it becomes in the absence of technology breakthroughs. We do not have all the solutions today to achieve our 2050 ambition and will continue to engage and partner with governments, customers, suppliers and technology providers to develop carbon abatement options that are both technically and commercially viable. Reducing the Carbon Footprint of Our Operations 2 Rio Tinto CO 2 e emissions managed Global CO 2 emissions IPCC <2° C IPCC 1.5° C Rio Tinto targets Cape Lambert, the Pilbara, Australia. 2010 2020 20252015 2030 120 100 80 60 40 -45% -25% 23Our Approach to Climate Change22 Our Approach to Climate Change
We have incorporated some small revisions to the 2018 equity baseline used for our 2030 targets from a review of our methodology for shipping emissions and a change in the approach to accounting for Scope 2 emissions at Escondida, the world’s largest copper mine, in Chile (managed by BHP, Rio Tinto owns 30%). This resulted in a slight increase in our 2018 baseline to 32.6Mt CO 2 e, compared to the 31.8Mt CO 2 e reported last year. At the end of 2019 our total emissions across managed and non-managed operations reduced to 31.5Mt CO 2 e on an equity basis. However, in 2020 our absolute emissions remained flat at 31.5Mt CO 2 e, equivalent to a 1.1Mt CO 2 e (or 3%) reduction against the 2018 baseline for our 2030 targets. The reductions we have achieved so far are mainly the result of using renewable electricity certificates at Iron Ore: 10%. Emissions from our iron ore Pilbara operations are mostly related to the natural gas used to generate power for the mines and processing plants, and from the diesel consumed by our mining and rail fleet. Copper & Diamonds: 9%. Diesel for trucks and electricity are the main sources of emissions in our copper business. Our Kennecott copper mine in the US purchases renewable electricity certificates, and Escondida in Chile is starting to transition to renewable power in 2021. The Oyu Tolgoi mine in Mongolia is currently supplied by coal-fired power from China. Energy & Minerals: 11%. Our titanium dioxide business is energy intensive and sources hydropower in Canada but relies on coal-fired power at Richards Bay Minerals in South Africa. The titanium smelting process also consumes carbon electrodes and heat for the furnace at Iron Ore Company of Canada (IOC) is produced from fossil fuels. Aluminium (Atlantic):17%. Even when supplied with 100% renewable power, the aluminium smelting process produces emissions from the use and degradation of carbon anodes. Bauxite & Alumina: 20%. The two main sources of emissions in the alumina refining process are from the coal and natural gas used for heat and calcination. Aluminium (Pacific): 32%. In addition to the process emissions from the degradation of carbon anodes, the Boyne and Tomago aluminium smelters in Australia are both supplied by coal-fired power generators. 2020 Scope 1 & 2 emissions by operations (equity basis) 2020 Scope 1 & 2 emissions by source (managed basis, %) Largely because of the high energy intensity of the aluminium business, our consumption of electricity is about four times that of other global diversified mining majors. However, our share of renewables – 75% across our managed operations – is more than eight times that of our peers. Given the progress already made to decarbonise the electricity we use, a large share of our emissions can be described as ‘hard to abate’. This includes emissions from our use of diesel in our mining and rail fleet, the combustion of anodes and reductants in aluminium smelters and titanium dioxide furnaces and the burning of fossil fuels to generate the steam and heat required in processing plants such as our alumina refineries. Repowering our business with renewable energy will continue to be a key priority in our decarbonisation effort. Our equity Scope 1 emissions from power generation are mostly from our equity share in the Gladstone Power Station, which supplies the Boyne aluminium smelter – both in Queensland – as well as from our integrated gas-based power network at our Pilbara iron ore operations in Western Australia. Purchased electricity accounts for about 28% of our total equity emissions – this is our Scope 2 emissions on an equity basis. Our Tomago (Australia), Oyu Tolgoi (Mongolia), Escondida (Chile) and Richards Bay Minerals (South Africa) joint ventures all currently purchase largely coal-based electricity. As announced last year, power arrangements at Escondida are due to transition to renewable-based contracts from 2021. Our Carbon Footprint Today Kennecott Copper, and also related to temporary operational disruptions, even though production levels were not materially impacted by COVID-19. In addition, we are yet to see the emissions benefits from our investment in abatement projects. The carbon intensity of our assets varies widely across our portfolio, and largely reflects the balance between mining and processing activities. Most of our assets already sit at the low end of their respective commodity carbon intensity curves. Operations with a predominant mining and logistics focus are less carbon intensive, while refining and smelting operations are high temperature, energy-intensive processes. Consequently, approximately 70% of our emissions today are from our aluminium business. Carbon intensity curves of global commodity producers by sector Reducing the Carbon Footprint of Our Operations Purchased power 35 Generated power 8 Process heat 14 Anodes & reductants 23 Mobile diesel 16 Other 4 Overall, the average carbon intensity of our portfolio has remained approximately level since 2018 at 6.4 tCO 2 e/tCu-eq in 2020. The reductions in emissions intensity since 2018 are smaller than the absolute emissions reductions because some of the operational disruptions, noted above, have disproportionally impacted operations with a lower carbon intensity than the Group average. The scale of our aluminium business strongly influences the Group’s carbon intensity average. Our aluminium smelting assets in Australia are challenged on carbon intensity, profitability and international competitiveness. We are working with governments, regulators and other stakeholders to get these assets on a stronger commercial footing while exploring repowering opportunities. However, the emissions from our Atlantic operation’s smelters are only 2.13tCO 2 e per tonne of aluminium, less than 20% of the industry average of 12.4 tCO 2 e/t Al. Our Vaudreuil operation in Québec, Canada, is also the lowest carbon footprint alumina refinery in the world today. In iron ore, the Iron Ore Company of Canada (IOC) operations are currently more carbon intensive than our Pilbara operations in Australia, but this is more than offset by the downstream (Scope 3) carbon benefits derived from the use of IOC’s higher-grade iron ore concentrates and pellets. And in copper, approved changes to power arrangements over the past couple of years will move our assets towards the bottom half of the carbon intensity curve. Reducing the Carbon Footprint of Our Operations Total 31.5Mt CO 2 e Aluminium (Pacific)Aluminium (Atlantic)Copper & Diamonds Iron Ore Energy & Minerals Bauxite & Alumina Other 0.4 3.0 2.7 3.6 5.3 6.4 10.1 Pac.Al Atl.Al 0 5 10 15 20 100%75%50%25%0% tC O 2 /t A l Global production Aluminium Iron Ore IOC RT Pilbara 0 50 100 150 200 100%75%50%25%0% kg C O 2 /d ry t o f ir on o re Global production RT 100%75%50%25%0% 1.5 2.5 1.0 0.5 2.0 0 t C O 2 /t A l 2 O 3 Global production Alumina Copper RT With KUC RECs + Escondida repowering 100%75%50%25%0% 0 5 10 15 tC O 2 /t C u E q 1 Global production Source: CRU, Wood Mackenzie, Rio Tinto analysis , 2019 data Notes: 1. excluding emissions from copper smelting and refining Sector average 24 25Our Approach to Climate Change Our Approach to Climate Change
As detailed in last year’s climate change report, our 2030 targets were informed by a bottom-up, asset-by-asset analysis of mitigation options. Our Energy & Climate Change CoE worked with our product groups to identify potential emissions reduction opportunities across our portfolio and developed both asset and Group-level marginal abatement cost (MAC) curves. In 2020, we integrated this approach into our annual Group planning process – led by the Planning Review Committee (PRC). The PRC, which includes the Chief Executive, Chief Financial Officer, Chief Commercial Officer, Group Executive, Strategy & Development and the Chief Executives of each product group, meets twice each year with a short (12-month) to medium-term (up to 10 years) delivery focus. Integrating climate into the work of the PRC creates a dynamic process to review our progress on emissions each year, ensure that projects remain on track to deliver our targets, continuously develop new options and align our climate-related spend with our broader capital and budget reviews. Through that process, we updated the 2019 MAC curves for each product group, looking at both new abatement options and various alternatives for the same sources of emission. The analysis focused on pre-2030 abatement options and included an assessment of project implementation risks from: – the level of technology readiness, and – the level of project execution readiness. Roadmap to Our 2030 Targets Group Marginal Abatement Cost Curve, 2030 Reducing the Carbon Footprint of Our Operations Reducing the Carbon Footprint of Our Operations The consolidated and risk-filtered abatement projects have been integrated into an updated Group MAC curve. To build the curve we calculate the net present value (NPV) of individual abatement projects and back solve the local price of carbon required to make each project NPV neutral, all else being equal. So, projects below the horizontal axis have a positive NPV at a carbon price of $0/t CO 2 e. The highest cost abatement opportunities are shown on the right side of the chart and require carbon price support to break even. Our longer-term net zero analysis indicates that higher carbon prices, than shown here, are needed for projects that will address harder-to-abate emissions post-2030. Our updated 2020 MAC curve to 2030 includes 44 projects with potential abatement of 6.9Mt CO 2 e, including 1Mt CO 2 e of potential last-resort Group offsets. This is up from 24 projects with potential abatement of 5.0Mt CO 2 e in our 2019 MAC curve. However, although our abatement portfolio has increased in size since 2019, the abatement achieved by projects with a positive NPV (at a carbon price of $0) has stayed relatively consistent at 2.4Mt CO 2 e. In addition, only approximately 5% of the abated emissions in the MAC curve are from projects that are both technologically viable and have reached either the pre-feasibility or feasibility stage today. Of the rest, about a third require further technology development and more than 60% of the abated emissions are from projects at the conceptual stage of execution readiness. So, while we have identified more abatement options than we need to meet our 2030 targets, we face continuing challenges to improve the commercial returns and overall readiness of many of our abatement projects. The commercial returns of abatement projects will also be influenced by the level of local carbon prices, which currently remain relatively low in many of the countries where we operate. $1bn Climate-related spend We estimate that our climate-related spend will be $1bn over a five-year period starting in 2020. Last year this included commitments and spend on: $28m – ELYSIS $98m – Gudai-Darri Solar project $14.5m – Baowu-Tsinghua partnership & Tsinghua University $8m – on 25 R&D projects and studies covering mainly renewable energy, alternative fuels, and process energy efficiency improvements 75 50 2.0 (2.4 Mt NPV positive projects) (NPV negative projects) Abatement Mt CO2 Group MACC, 2030 (no carbon price) $/t CO2 4.03.0 5.0 6.0 6.9 25 0 (25) (50) (75) (100) Iron Ore Aluminium Copper & Diamonds Energy & Minerals Group offsets 2019 MACC (5 Mt CO2, 24 projects pre-2030) 26 27Our Approach to Climate Change Our Approach to Climate Change
Our competitive advantage Reducing the Carbon Footprint of Our Operations Open cycle gas turbines provide firming of intermittent renewable energy and our existing network provides pathways for future potential fleet electrification. Stage one $98 million approved. Estimated completion 2022 34MW solar PV at Gudai-Darri 45MW/12MWh battery for spinning reserve at Tom Price Stage two Under active study Additional solar and battery projects Installation of wind energy monitoring Stage three Conceptual with technology solutions needed Increased renewable energy penetration Long-term diesel substitution Pilbara power network * Applies to approved abatement projects over 2020 and 2021. Short-term target is integrated into incentive plan (see section on remuneration) Our abatement projects target over 2020 and 2021* 0.5Mt CO2e Roadmap to Our 2030 Targets continued Renewables Pathway in the Pilbara Reducing the Carbon Footprint of Our Operations 2030 emissions abatement pathway Renewables Mt CO 2 e reductions from execution of planned abatement projects Process heat Energy efficiency NCS offset Mobile diesel This comprehensive analysis has given a further understanding of the challenges and work to deliver our emissions targets. At the Group level, the two most important decarbonisation levers between now and 2030 are: 1. To continue switching the electricity we generate and purchase to renewables, and 2. To optimise processing plants in our alumina and minerals businesses and start trialling new technologies to reduce emissions from the use of coal and natural gas for process heat. We also have several initiatives under way to develop low-carbon solutions that will reduce and displace the use of diesel in our rail and mobile fleets, but at this stage we do not expect material emission reductions from these before 2030. Each of our product groups face different medium-term opportunities and challenges. These have shaped detailed five-year decarbonisation roadmaps to 2024 with the following priorities: – Aluminium – Identify low-emission alternatives to the use of coal and gas in calcination and digestion at our refineries, including pilots at Yarwun; continue work to develop a repowering solution at our Pacific Aluminium smelters; advance renewables at bauxite mines; complete the first industrial pilot and continue to advance ELYSIS technology. – Copper & Diamonds – Secure cost-effective renewable energy certificates and/or renewable power options to extend Kennecott’s current low-carbon footprint beyond 2025; progress studies on low-emission copper processing technologies; develop carbon-neutral growth plans at Winu; advance alternative fuels truck trials. – Energy & Minerals – Progress investment in renewables in Africa at both Richards Bay Minerals and QIT Madagascar Minerals (QMM); evaluate renewables options at Boron; develop low-emission process heat technology including the trialling of plasma torches at our iron ore business in Canada; develop carbon-neutral growth plans as part of the feasibility study for our Jadar lithium project in Serbia. – Iron Ore – Execute stage one of the Pilbara renewables pathway and advance individual stage two studies and projects including for new wind power options; in parallel explore commercial partner options to accelerate the energy transition across the Pilbara system; continue to develop low-emission alternatives for mobile fuel use in haul, load and rail. 0 -3.0 -2.5 -2.0 -1.5 -0.5 -3.5 -4.0 -4.5 -5.0 2021 2022 2023 2024 2025 – 2030 28 29Our Approach to Climate Change Our Approach to Climate Change
Our Net Zero Ambition: 2050 Decarbonisation Strategy Reducing the Carbon Footprint of Our Operations In addition to the extensive work to progress and execute projects to meet our 2030 targets, we are also setting up the foundations for the next wave of abatements needed to carry us through to our long-term ambition of reaching net zero emissions across our operations by 2050. Although we have the outline of a broad pathway to net zero, we do not have all the solutions today. Renewables Process heat Mobile diesel Anodes & reductants Offsets 2020 2030 2040 2050 2020 2030 2040 2050 2020 2030 2040 20502020 2030 2040 2050 Decarbonising power – renewables A continued shift to renewables is central to meeting our 2030 targets and will remain an important area of focus beyond 2030, as we increasingly electrify our processes and mobile fleets – these will need to be supplied by green energy. Further repowering with renewables must be done in a way that reduces costs and maintains security of supply. Integration technologies and storage will be critical to the success of achieving a higher penetration of renewable energy. The transition to greater electrification and to low-carbon energy carriers such as green hydrogen will require significant technology breakthroughs. Our product groups are already evaluating several new abatement technologies in collaboration with our Technical Centres of Excellence. We also recognise that the best solutions will come from partnerships with suppliers and technology providers, as well as with our industry peers facing common challenges. Decarbonising process heat Our Processing Centre of Excellence is particularly focused on our process heat challenge, which will likely play out over several decades in some of our harder-to-abate operations in alumina, iron ore and titanium dioxide. Technologies like hydrogen or plasma torches, which can use renewable energy, may provide a pathway to replace fossil fuels for heat and steam. Our current focus is to develop and deploy these technologies and look for opportunities to pilot them. Decarbonising mobile diesel (vehicles and rail) Mobile diesel is our third highest GHG emission source at approximately 16% of total emissions. We completed analysis and concept modelling of emissions sources and energy needs at our fleet and have identified and prioritised zero emissions pathways. We are working to accelerate development of, and to de-risk, the required technology for switching to clean energy sources. We are doing this through industry collaborations such as ICMM’s Innovation for Cleaner Safer Vehicles (ICSV) and direct engagement with our suppliers and other partners. Our preferred technology pathway is the most energy efficient and targets full battery electric fleet with dynamic or fast charging technology to maintain fleet productivity. Technical challenges with this pathway involve creating flexibility in the infrastructure so it can adapt to changing haul roads and the limitations on battery charge rates. An alternative pathway builds off the battery electric technology but replaces the dynamic or fast charging technology with the less energy efficient hydrogen cycle (electrolysis and fuel cells). Technical challenges with this pathway involve storing and transporting hydrogen and dealing with transient power requirements that are typical in mining fleet. Decarbonising anodes and reductants Emissions from the use of anodes such as in our aluminium smelters is also a longer-term challenge. We established the ELYSIS partnership in 2018 with Alcoa and with support from Apple and the governments of Canada and Quebec to develop the world’s first carbon-free aluminium smelting process, using inert anodes instead of carbon. Offsets Given the high cost of emissions reductions and lack of commercially viable low-carbon alternative technology for parts of our business, our long-term ambition is for our operations to be net zero emissions by 2050, rather than zero emissions. Carbon offsets and removals will therefore form part of our decarbonisation strategy. We support the mitigation hierarchy outlined by the World Business Council on Sustainable Development (WBCSD): companies should prioritise avoiding and reducing emissions before using offsets. Carbon-neutral growth The development of carbon-neutral projects requires a shift from traditional mine and infrastructure design. A ‘design for net zero’ approach requires our product groups and projects teams to manage capital and carbon intensity trade-offs to achieve cost-effective emissions reductions. This requires leveraging the capability and expertise of partners in key areas of renewable energy, low-emissions processing technology, and zero-emission vehicles early in the project design process. 2050 decarbonisation pathway Reducing the Carbon Footprint of Our Operations Repowering, mine depletion, closure and carbon neutral growth 30 31Our Approach to Climate Change Our Approach to Climate Change
Our Net Zero Ambition: 2050 Decarbonisation Strategy continued Reducing the Carbon Footprint of Our Operations Reducing the Carbon Footprint of Our Operations Our Centres of Excellence work with the product groups to investigate emissions abatement technology use cases. Exploring the potential of investment in Natural Climate Solutions. Our approach to a just transition. We believe that the low-carbon transition must accelerate business action, be socially inclusive and address impacts on competitiveness. In some cases, trying to accelerate emissions reductions could have the undesirable outcome of promoting plant closures and reducing employment. This would have a particularly negative impact on remote communities who often rely on mining and industrial activities for their livelihoods. We do not have an explicit position on ‘just transition’. However, we address related stakeholder issues in our approach to closure. Although it may extend over decades, mining is a temporary land use. It is therefore a priority that we plan for the closure of our operations when the commercially recoverable ore and associated processing capacity is exhausted. All of our businesses plan for closure from the earliest stages of project development. This planning is intended to minimise financial, social and environmental risks when the operation eventually closes and optimise social, economic and cultural opportunities for the host community. “ Climate transitions need to happen quickly. They… also need to be fair, to be just. That means that transitions need to respect the fundamental rights of all involved, in particular the most vulnerable.” Institute for Human Rights and Business Surface Mining Centre of Excellence – Pilbara electric haul truck collaboration – Battery electric tender collaboration – Battery/fuel-cell electric 40-100t trucks – Engagement with power service providers on batteries and charging – Ongoing discussions with vehicle and engine manufacturers to investigate the substitution of diesel with renewable fuels and compressed natural gas in vehicles – Analysis of alternate rail technology including battery electric locomotives Processing Centre of Excellence – Plasma torch applications: – Induration furnaces – Ladle pre-heaters – Aluminium casting furnaces – Biochar in ilmenite reduction process – Hydrogen as a substitute for anthracite in ilmenite reduction – Hydrogen use in downstream iron ore processing – Electric drying technology application in our minerals business – CCS technology use cases We appreciate the concerns about the integrity of forest carbon offsets. We would adhere to the four principles that WBCSD and Nature4Climate recommend for any investment in Natural Climate Solutions (NCS): 1. Raise ambition with respect to climate action. 2. Provide an interim solution for hard-to-abate emissions, but not a permanent one. 3. Deliver environmental and social safeguards and benefits in addition to GHG emissions reductions. 4. Apply sound and verified carbon measurement and accounting methodologies to ensure high environmental integrity of NCS credits. Our priority is to develop and implement abatement projects to decarbonise our portfolio in the medium and long term. Therefore, our initial focus on offsets will be on identifying NCS projects within our operational boundaries. In 2020 we started developing NCS projects in the Pilbara and in Madagascar. We are still in the early stages of developing a Group-wide offset strategy and we will be defining our approach in 2021. 33Our Approach to Climate Change32 Our Approach to Climate Change
While the carbon footprint of our operations represents less than 0.1% of global CO 2 emissions, we operate within value chains that have significant scale and include downstream processes that are highly energy and carbon intensive. Our approach to managing emissions across our value chains depends on our level of control and influence. This is in turn strongly linked to the make-up of our product portfolio. We were the first global diversified miner to divest all fossil fuel assets and the products we sell do not contain carbon. Unlike our peers, we are unable therefore to set Scope 3 targets that can be met through the natural depletion of mines or the substitution from high to lower carbon products in the product mix. The metals and minerals we sell are essential to the global transition to a low-carbon future and cannot be easily substituted. For our business, Scope 3 emissions are primarily from the direct or indirect use of fossil fuels by our customers in the processing of our products. Our ability to influence directly the decarbonisation of our customers’ hard-to-abate processes is limited, but we recognise that we have a role to play. Our approach is based on global collaboration and close partnerships with our customers, suppliers and even competitors, to develop innovative solutions for the reduction of carbon emissions across our value chains and ensure that we deliver the products our customers need to decarbonise their businesses. China, Japan and South Korea – our key customer regions – have all made new commitments in late 2020 to reach carbon neutrality or net zero by around mid-century. This is the context within which our customers will be considering their Scope 1 & 2 footprints and decarbonisation roadmaps. This year, we have defined measurable and impactful goals to guide our partnerships effort, supported by medium-term milestones and near-term objectives. As for our Scope 1 & 2 abatement plans, performance against our Scope 3 objectives for 2021 will be explicitly linked to executive remuneration. $10m spend committed on 2021 R&D projects within Baowu-Tsinghua partnership New steel value chain partnership signed with Nippon Steel Committed to 40% reduction in shipping emissions intensity by 2030 and ambition to reach net zero carbon shipping by 2050 Partnering to Reduce the Carbon Footprint Across Our Value Chains 3 Rainbow Bridge at dusk.Tokyo, Japan. 35Our Approach to Climate Change34 Our Approach to Climate Change
Our context Our goals Our medium-term targets Our 2021 objectivesOur approach Fossil fuel free portfolio – the products we sell don’t contain carbon We supply metals and minerals essential to transition to a low-carbon future – cannot be easily substituted 85% of scope 3 emissions in countries that have committed to carbon neutrality by mid-century 80% of scope 3 emissions from customers’ hard-to-abate processes Work in partnerships with customers on steel decarbonisation pathways and invest in technologies that could deliver reductions in steelmaking carbon intensity of at least 30% from 2030 Establish and advance at least four steel value chain partnerships by 2025, including annual investment commitment in technologies consistent with our goals Work in partnerships to develop breakthrough technologies with potential to deliver carbon neutral steelmaking pathways by 2050 Participate in advancement of at least one technology with potential for carbon neutral steelmaking to industrial pilot scale by 2025 Complete feasibility study of green hot briquetted iron (HBI) production with hydrogen from hydro-electricity in Canada with Paul Wurth and SHS Steel Work in partnerships to develop breakthrough technology enabling of zero-carbon aluminium smelting Progress ELYSIS™ technology to commercial maturity stage by 2025 Progress industrial-scale ELYSIS™ technology research and development following construction of first industrial pilot in late 2020 Ambition to reach net zero emissions from shipping of our products by 2050 Meet IMO goal of 40% reduction in shipping emissions intensity of our products by 2030 Approve introduction of LNG dual-fuel vessels to our shipping portfolio Pursue proactive and action oriented partnerships supporting the development and deployment of low-carbon technologies for hard-to-abate processes to progress the decarbonisation of our value chains in line with the goals of the Paris Agreement 11 Progress low-carbon steelmaking projects and research with China Baowu Steel Group as part of $10 million commitment in late 2020 to advance our partnership with Baowu and Tsinghua University Develop work programme and identify joint low-carbon steelmaking technology projects with Nippon Steel as part of climate MoU signed in December 2020 Establish third steel value chain partnership 1 2 3 422 533 644 Partnering to Reduce the Carbon Footprint Across Our Value Chains Our Scope 3 Partnership Goals Partnering to Reduce the Carbon Footprint Across our Value Chains 36 37Our Approach to Climate Change Our Approach to Climate Change
Partnering to Reduce the Carbon Footprint Across Our Value Chains Scope 3 emissions are indirect emissions from value chain activities both upstream and downstream of our business. These emissions – beyond our operating perimeter and operational control – are difficult to influence or even calculate. This year we have updated our approach to estimating Scope 3 emissions and details of our assumptions are available in our separate 2020 Scope 1, 2 and 3 Methodology Report. Our estimates of Scope 3 emissions add up to 519Mt CO 2 e in 2020 on an equity basis, of which 97% relate to the processing of products by our customers. The remaining 3% relate to emissions in other parts of our value chains, including shipping. Scope 3 Emissions in Our Value Chains 2020 scope 3 emissions 88% of Scope 3 emissions are generated in regions that have committed to carbon neutrality by mid-century Emissions related to the processing of the iron ore, bauxite and alumina that we sell to third parties remain by far the two main sources of Scope 3 emissions for our business. Within this category, direct processing emissions from steelmaking, alumina refining and aluminium smelting account for 80% of our scope 3 emissions and are considered to be hard to abate. These are the parts of the value chains that we have prioritised for our partnership approach and we provide more details below on each of these sectors, including our progress to date against our Scope 3 goals and plans for 2021. Our new approach to estimating Scope 3 emissions has given us a more granular breakdown of the sources of emissions across the various steps of the downstream processes that use our products. It has also enabled us to get a more accurate representation of the geographical split of those emissions, most of which are generated in Asia, which is therefore the primary focus of our partnering effort. Copper is a highly efficient electrical conductor and a key material for low-carbon technologies that will play a critical part in the transition to a low-carbon economy such as electric vehicles and wind turbines. Through our interests in Kennecott in the US, Oyu Tolgoi in Mongolia and Escondida in Chile we produce both copper concentrate and refined copper. Scope 3 emissions in this instance relate to the emissions from the processing of the copper concentrate sold to our customers into refined copper, most of which takes place in China. After the processing stage, primary metals such as steel, aluminium and copper are transformed into semi- fabricated products (eg extrusions, sheets, plates, wires) and then into parts that get assembled into final products (eg buildings, cars, machinery, consumer goods). Emissions from this part of the value chain and through the life cycle of end products are more difficult to quantify. In many cases, the ultimate use of the materials we produce may contribute towards reducing emissions compared with alternative solutions. Our updated approach to estimating Scope 3 emissions and details of our assumptions are available in our separate 2020 Scope 1, 2 and 3 Methodology Report on our website. Our customers’ emissions from the processing of other products in our portfolio are significantly lower. We have added this year estimates from the processing by our customers of our titanium feedstocks and copper concentrate. Together these account for less than 2% of total Scope 3 emissions. Our titanium dioxide business provides the main feedstock for the TiO 2 pigment industry which is used in a wide range of industrial and consumer products including paints, plastics, cosmetics, paper, rubber, ceramics and textiles. Our operations, located in Madagascar, South Africa and Canada, are involved in a complex value chain but our ability to provide high-grade TiO 2 feedstock supports lower carbon-intensity production of materials. MtCO 2 e China 389.6 Japan 43.5 South Korea 17.4 EU 7.7 Other countries* 61.0 * Other countries that have not set a carbon neutrality goal or emissions not attributed to specific regions (eg shipping). MtCO 2 e Processing of iron ore 376.4 Processing of bauxite and alumina 116.4 Processing of titanium dioxide feedstocks 5.8 Processing of copper concentrate 0.5 Processing of other sold products 2.5 Purchased goods 6.6 Capital goods 0.1 Fuel related activities 2.8 Business travel 0.1 Upstream and inter-company transportation 5.1 Downstream transportation 3.0 Partnering to Reduce the Carbon Footprint Across our Value Chains 519MtCO 2 e 519MtCO 2 e 72%22% 5% 75% 8% 12% 3% 2% 38 39Our Approach to Climate Change Our Approach to Climate Change
The aluminium value chain accounts for about 3% of global carbon emissions with around 80% occurring during the smelting phase, which converts alumina into primary aluminium metal. In turn, just over a quarter of these aluminium smelting emissions come from the combustion of carbon anodes, with the rest mostly from the generation of electricity. The energy source used for that electricity is therefore the key factor driving the carbon intensity of aluminium smelters, ranging from around 2tCO 2 e/t Al for hydro-powered smelters such as our operations in Canada, up to around 17t CO 2 e/t Al for smelters using coal-fired power and an industry average of about 12.4t CO 2 e/t Al. Emissions from bauxite mining: 1Mt CO 2 e Emissions from process heat: 5Mt Co3e Emissions from electricity: 8Mt CO 2 e Emissions from process heat: 15Mt CO 2 e Emissions from electricity: 79Mt CO 2 e Emissions from electricity: <1Mt CO 2 e Anodes and reductants: 7Mt CO 2 e Emissions from electricity: 3Mt CO 2 e Anodes and reductants: 19Mt CO 2 e We sell around 70% of the bauxite we produce, as well as some alumina, to third parties. These customers generally have alumina refineries and smelters with higher carbon intensities than our own operations. The net zero transition pathway for the global aluminium industry, including our customers, will require a viable replacement for carbon anodes in the aluminium smelting process and the decarbonisation of process heat and electricity. Technologies such as ELYSIS™ to replace carbon anodes with inert materials could eliminate over 16% of the scope 3 emissions related to the processing of our bauxite and alumina third-party sales. Decarbonising the energy systems that provide the electricity and heat used by our customers in their alumina refineries and aluminium smelters will require a broader co-ordination between governments, industry and energy providers. However, it is worth noting that countries aiming for net zero tend to prioritise the low-carbon transition of their national power sectors within their decarbonisation roadmaps. Nearly 90% of the emissions in our bauxite and alumina value chain occur in countries with mid-century targets for carbon neutrality. In the meantime, we are also taking steps to directly support our customers’ decarbonisation journey. We have a dedicated technical marketing team that works with our customers on projects to improve the efficiency of their facilities. By combining this expertise, our customers can enhance the efficient processing of our products and reduce their carbon emissions. Our Bauxite and Alumina Value Chain Emissions Bauxite S co p e 1 & 2 S co p e 3 Diesel switching programme Renewable grid deployment Regional power grid decarbonisation ELYSIS™ inert anode technology Customer partnerships targeting process heat and efficiency Regional power grid decarbonisation A b at em en t ac ti o n Alumina Aluminium smelting Partnering to Reduce the Carbon Footprint Across Our Value Chains The Aluminium Value Chain Our partnerships in the aluminium value chain and 2020 progress We were the first aluminium producer to offer Aluminium Stewardship Initiative (ASI) certified low-carbon aluminium through a “chain of custody” spanning our bauxite mines in Australia, our alumina refineries and our hydro-powered aluminium smelters and casthouses in Australia, New Zealand, Canada and Iceland. Our ELYSIS partnership We established the ELYSIS partnership in 2018 with Alcoa and with support from Apple and the governments of Canada and Quebec to develop the world’s first carbon- free aluminium smelting process, using inert anodes instead of carbon. Apple purchased the first commercial batch of ELYSIS aluminium in 2019 and started using this metal in its MacBook Pro. In 2020, the ELYSIS™ technology achieved production of commercial grade aluminium and the electrode materials performed as expected. The construction of the first industrial pilot has been recently completed in Canada and start-up is planned in the first half of 2021. The completion of the facility is the next step towards ramping up to industrial scale the breakthrough technology, first developed at the Alcoa Technical Center near Pittsburgh in the United States. The new centre will produce metal at a scale similar to smaller, industrial-sized smelting cells that are in operation by some producers today. We anticipate that the ELYSIS™ technology will reach commercial maturity in 2024. Advancing a circular economy In October 2020, we partnered with Anheuser-Busch InBev (AB InBev), the world’s largest brewer, to deliver beverage products in cans made from low-carbon aluminium. Initially focused in North America, the partnership will see AB InBev use our low-carbon aluminium made with renewable hydropower along with recycled content to produce a more sustainable beer can. This will offer a potential reduction in carbon emissions of more than 30% per can, compared to similar cans produced today using traditional manufacturing techniques in North America. In 2020, we announced a partnership with Shawinigan Aluminium to introduce our first closed loop recycling solution in Canada. We are developing a $7 million state of the art smelting facility adjacent to Shawinigan’s aluminium billet casthouse in Quebec, giving us the capacity to recycle a further 30,000 tonnes of aluminium per year. In November 2020, we announced the development of a new family of unique aluminium alloys designed to allow North American die casters to increase their use of recycled content in the production of car parts. These new alloys will provide a lower-carbon alternative to the existing supply chain options available for car parts in the North American market. Throughout 2020 we have also continued to progress local recycling initiatives, linking our smelters with local scrap take-back in New Zealand, Canada and Australia. These local initiatives are helping to unlock the full recycling potential of our facilities, providing steps toward localised circular economies. Partnering to Reduce the Carbon Footprint Across our Value Chains 41Our Approach to Climate Change40 Our Approach to Climate Change
Partnering to Reduce the Carbon Footprint Across Our Value Chains Steel is one of the most efficient construction materials and has a similar carbon footprint per tonne of product, from ore to metal, to hydro-based aluminium. However, because of its attractive properties and cost, the steel value chain also has a much bigger scale, with close to 2 billion tonnes of crude steel produced in 2020, compared to around 65 million tonnes of primary aluminium. As a result, emissions across the steel value chain account for around 9% of global energy related and industrial CO 2 emissions. The iron ore mining phase accounts for around 2% of the overall carbon footprint across the steel value chain. Most of the emissions are generated at the steel-making stage in either the integrated blast furnace and oxygen route (BF/BOF) or the electric arc furnace route (EAF). The blast furnace steelmaking route is based on a reduction process that utilises carbon to convert iron ore into steel. It accounts for around 71% of global crude steel production and over 99% of the steel produced using our iron ore. We estimate that our customers produced around 376Mt CO 2 emissions from the processing of our iron ore into steel in 2020. Our higher-grade ores, including lump and pellets from our IOC joint venture, enable our customers to reduce their carbon footprint. Emissions associated with BF/BOF steelmaking include from coke production, the sintering process and the blast furnace and oxygen furnace where iron ore is converted into steel. Emissions from this process are largely attributable to the consumption of metallurgical coal used in the process. There is some variability in the carbon intensity of integrated steel mills based on operating performance and the input materials used, but this produces only small deviations from an average of around 2.2 tonnes of CO 2 per tonne of crude steel for the BF/BOF The Steel Value Chain route. Although several technologies are under development to reduce emissions from this route in the short and long term, they are not expected to achieve net zero steel production without significant use of carbon capture and utilisation or storage. The electric arc furnace (EAF) steelmaking route, using scrap steel or direct reduced iron (DRI), can replace the role of metallurgical coal in the conversion of ore to steel. This offers the potential for net zero steel production if green hydrogen-based DRI is paired with a zero emissions electricity supply to an EAF. Despite the emergence of this technology, transitioning global steel production to a green DRI/EAF production route faces significant complexity and requires large-scale, low-cost renewables and currently is not a suitable processing route for more than 70% of global iron ore products. The blast furnace steelmaking route presents a more economically efficient steelmaking option in many regions while also enabling steelmakers to use a variety of iron ores in order to create high quality steel for modern applications. The global iron ore supply consists of ores with varying quality and impurities, most of which can be accepted only in the blast furnace steelmaking route, and global steel demand could not currently be met without the flexibility offered by the BF/BOF. These supply constraints and current economic realities suggest that the BF/BOF steelmaking route will continue to be used for several decades. Transitioning the steel industry to play a role in a low-carbon future will require a co-ordinated approach to identify technology and energy solutions that can ensure world steel demand can be met with low-carbon products. Partnering to Reduce the Carbon Footprint Across our Value Chains Coke oven Blast furnace DRI Shaft furnaceSteel converter Liquid steel Natural gas Sinter plant Electric arc furnace Liquid steel 20% CO 2 9% CO 2 64% CO 2 7% CO 2 Scope 3 emissions boundary Lump & pelletsFines Biomass and microwave ore preparation Hydrogen as an iron ore reductant CCULump optimisation P ar tn er sh ip in it ia ti ve s A b at em en t ac ti o n s CCS/U H 2 /biomass iron-making + BOF Ore preparation and H 2 injection BF/BOF optimisation Short-term/partial decarbonisation Longer-term/net zero potential Integrated Blast Furnace Route (BF/BOF) BF/BOF decarbonisation options To address this challenge, we are working with our customers in both the BF/BOF and DRI/EAF routes on short- and medium- to long-term abatement technologies that could be deployed at their facilities. These include: – exploring BF/BOF optimisation and low-carbon ore preparation techniques that can be deployed to assist with our customers’ short-term carbon abatement targets; – supporting advances in hydrogen ore reduction, biomass utilisation and CO2 conversion to industrial chemicals to enable more material abatement of BF/BOF emissions in the medium term; – studying a project in Canada that uses our high-grade ores together with economically viable green hydrogen to produce DRI. 42 43Our Approach to Climate Change Our Approach to Climate Change
Partnering to Reduce the Carbon Footprint Across Our Value Chains China Baowu and Tsinghua University In late 2019 we entered a long-term partnership with China Baowu and Tsinghua University to develop and implement new methods to reduce carbon emissions and improve environmental performance across the steel value chain in China. During 2020, the partnership established two R&D projects to increase the use of lump ores in blast furnace operation, because lump ore processing generates lower emissions across the value chain. Tsinghua also recently co-ordinated the publication of a book on China’s energy transformation and decarbonisation routes in the face of climate change challenges, including a chapter on the low-carbon technology development of the Chinese steel industry. In December, the partnership held its inaugural ‘China low-carbon steel conference’ in Beijing, bringing together representatives across the China steel industry to discuss transition pathways for the sector. Through our commitment of $10 million for research projects and $4.5 million for the Tsinghua University Joint Research Center, the partnership has agreed a significant work programme for 2021. The funding will be used to advance projects on Low Carbon Materials Preparation R&D, including the development of a pilot testing facility for biomass application and the use of microwave technology in ore preparation. The funding will also support work on CO 2 utilisation and conversion at the China Baowu Low Carbon Metallurgical Innovation Centre. These programmes will support China Baowu’s ambition to peak its carbon emissions by 2023, cut carbon emissions by 30% by 2035 and achieve carbon neutrality by 2050. They will advance technologies that will be crucial in reducing emissions from China’s existing blast furnace steelmaking facilities and will support both the short and long-term decarbonisation goals of the steel industry. Nippon Steel Corporation In December 2020 we signed an MoU with Nippon Steel Corporation, Japan’s largest steel producer, to jointly explore, develop and demonstrate technologies to transition to a low-carbon emissions steel value chain. Japan’s recent announcement of its commitment to realise a carbon-neutral society by 2050 has given Japanese companies even greater impetus to accelerate their decarbonisation activities and this partnership is intended to support this goal. In line with the long-term and complex nature of the transition to carbon neutrality for the steel industry we have implemented a long-term partnership model. This model allows the partners to pursue new and promising technologies as the global steel transition evolves. While the partnership will explore a breadth of technologies for low-carbon steelmaking, it will initially focus on research into the use of gas, including hydrogen, as an ore reductant in Nippon Steel’s blast furnaces. It will also look at potential roles for hydrogen in our mining operations. We will also work together to reduce the emissions associated with iron ore shipping. Paul Wurth and SHS – Stahl-Holding-Saar We signed an MOU with Paul Wurth and SHS – Stahl-Holding-Saar (Dillinger/ Saarstahl/Rogesa) to explore the feasibility of the production of green hot briquetted iron (HBI) with hydrogen from hydro-electricity in Canada. The partnership will combine our IOC high-grade iron ores and expertise in direct reduction, Paul Wurth’s competence in plant building and process knowledge of hydrogen generation and direct reduction plants as well as SHS’s iron and steel-making expertise to explore the development of low-carbon solutions for the steel value chain. The feasibility study is scheduled for completion in late 2021. Our partnerships in the steel value chain and 2020 progress In 2020, shipping of our products accounted for around 1.5% of our Scope 3 emissions, or 8.1Mt CO 2 e. These emissions are in addition to 0.5Mt CO 2 e of Scope 1 emissions generated by Rio Tinto’s owned vessel fleet. Over 66% of our total shipping emissions are related to the shipping of iron ore, 21% the shipping of bauxite and the remainder related to other products and raw materials supply. In 2018, the International Maritime Organization (IMO) adopted an initial greenhouse gas emissions strategy with an ambition to reduce carbon intensity of international shipping by 40% by 2030 compared to 2008. We are committed to meeting this IMO goal and have set a new ambition to reach net zero carbon emissions from shipping of our products by 2050. To date, we have already reduced the emissions intensity of shipping of our Australian iron ore and bauxite on our owned and time-chartered fleet by over 30%, exceeding the IMO 2008 baseline. This has been achieved by working closely with our shipping partners and customers to utilise larger and more efficient vessels and by delivering scheduling efficiencies from our owned and operated ports. In order to meet and exceed our commitments, we are advancing a combination of initiatives including the chartering of more efficient vessels, the inclusion of vessels powered by liquefied natural gas into our charter portfolio, and advanced data analytics to support fleet management and scheduling to further reduce waiting and cycle time. Partnering to Reduce the Carbon Footprint Across our Value Chains Coke oven Blast furnace DRI Shaft furnaceSteel converter Liquid steel Natural gas Sinter plant Electric arc furnace Liquid steel CO 2 CO 2 emissions from power supply Scope 3 emissions boundary Pellets Electric Arc Furnace Route (EAF) H 2 HBI plant feasibility study P ar tn er sh ip in it ia ti ve s A b at em en t ac ti o n s Biomass- based iron Green H 2 DRI/HBI The Steel Value Chain continued EAF decarbonisation options Shipping Short-term/partial decarbonisation Longer-term/net zero potential Renewable power 45Our Approach to Climate Change44 Our Approach to Climate Change
Taking and managing risk responsibly is essential to running our business safely, efficiently and in a way that creates value for our customers, shareholders, employees and partners. Effectively managing our risks ensures we meet our strategic objectives, mitigate threats and create opportunities in alignment with our values – Safety, Teamwork, Respect, Integrity and Excellence. Our approach Effective risk management is necessary to manage both threats and opportunities to our strategy and operations. Our risk management process helps us identify, evaluate, plan, communicate, and manage material business risks that have the potential to impact our business objectives. While risk management is a key accountability and performance criteria for our leaders, all employees have a responsibility for identifying and managing risks. Our Board and Executive Risk Management Committee provide oversight of our principal risks and associated management responses described in the Annual Report. The Audit Committee monitors the effectiveness of the risk management and internal control framework. Our risk management system is made up of six core elements – one of which is our risk management framework, which sets out clear roles and responsibilities, standards and procedures. We also have three lines of assurance to verify risks are being effectively managed in line with our policy, standards and procedures, including across core business processes such as finance, health and safety, social performance, environment and major hazards. We continually strive to improve how we identify and manage risks across our business. In 2020, we have strengthened the control framework by developing a set of control management principles aimed at driving consistency and quality in the definition of our Group control requirements to guide implementation. Every part of our risk management framework is there to challenge and evaluate the status of our risk profile in the pursuit of our business objectives. The way we challenge the status is by having three lines of assurance that support leaders in critically reviewing and validating their own operating assumptions. Our model is based on three lines of assurance. Three lines of assurance Responsibilities Accountability of All Operational leaders Manage their risks, including verifying internal controls have been implemented and are effective Management Centres of Excellence and Areas of Expertise Provide objective verification of compliance and assess effectiveness of internal controls as per the Group’s policies, standards and procedures Management Group Internal Audit Provide independent verification that risks and internal controls are being managed effectively Board and Board Committees Enhancing Our Resilience to Physical Climate Risk 4 Chith Export Facility at our Weipa operations in Far North Queensland, Australia. 47Our Approach to Climate Change46 Our Approach to Climate Change
Enhancing Our Resilience to Physical Climate Risk The principal risks and uncertainties outlined reflect the risks that could materially affect (negatively or positively) our performance, future prospects or reputation. A principal risk is one or a combination of risks which can manifest externally or internally, be of any nature, and escalate from any area of the business. As such, we set expectations that all our leaders and team members understand their risks, assess them in line with Group policies and procedures, and respond. Where risks are material to the Group, they are escalated to the Executive Risk Management Committee and, as appropriate, to the Board or its committees. The principal risks section of the Annual Report includes both the low-carbon transition and the physical impacts of climate change. Enhancing our resilience to physical climate risks is an important component of our climate change strategy. Our Critical Risk Assessment process is founded in site-specific exposures, including those related to climate change such as wildfires, cyclones, floods and landslides at a more regional level. We consider climate-related risks over the life of our operations, from design to closure and beyond. We have already seen the impact of extreme weather events at many of our sites. We use scenarios such as those developed by the Intergovernmental Panel on Climate Change (including the Representative Concentration Pathway 8.5 which We have been operating in British Columbia for over 65 years. In 2015, we invested $6.3 billion to increase the production capacity of aluminium by 50% to 420 000 tonnes while reducing the emissions intensity by 50%. With industry leading technology as well as a clean hydropower facility at Kemano and the Nechako Reservoir, the Kitimat smelter produces aluminium with one of the lowest carbon footprints in the world. Water stewardship is critical to the reliability and security of the operations, and to the river systems, fisheries and communities, and so we have been gathering weather data from several mountain locations within the Nechako Watershed since the 1950s. With the Natural Sciences and Engineering Research Council of Canada (NSERC) we are funding research at the University of Northern British Columbia (UNBC) to quantify the roles of climate variability, climate change and water management in the Nechako River watershed. There are three main themes for the research that will be delivered through the C$1.5 million funding from NSERC and Rio Tinto: – Hydrometeorological monitoring and data collection; – Atmospheric and terrestrial rivers; and – Hydrological and water temperature modelling. Examples of specific research projects include expanding the number of hydrometeorological research stations in the Nechako River basin, monitoring the terrestrial impact of atmospheric rivers and projecting the future hydrology and water temperatures of the Nechako watershed. Researchers undertook field work and installed sensors in the watershed in the summer and autumn of 2020. They installed a weather station at Mount Sweeney and set up rain gauges and water temperature data loggers in the Upper Nechako. The UNBC partnership is an integral way to learn about the long-term impacts of climate change to this region, and to better plan and operate for the future. The benefits of this research will include improved knowledge on the reliability and security of freshwater resources, which is critical to the hydro-power operations. The research will also help us make operational decisions on water retention and releases from the Nechako Reservoir to ensure stable and reliable water supply for Kemano Powerhouse while sustaining Nechako River flows for ecological needs. Risk assurance – Assurance for management that risks and critical controls are being managed effectively. Capability and culture – Risk capability built through coaching and training for leaders and teams across our business – Risk culture of active management of risks is embedded into how we run our business – Risk culture fosters collective ability to identify and understand, openly discuss and respond to current and future risks. Systems, technology and data analytics – Leverage systems and data analytics to support risk analysis, management and oversight. Risk management framework – Group’s roles and responsibilities, standards, procedures and guiding principles for effective, consistent and integrated risk management. Risk analysis and management – Risks are measured, monitored and managed which requires that critical controls performance is also being measured, monitored and managed – Risks and their control information are current, transparent and connected – Leader-led analysis and management. Reporting oversight and insights – Management’s oversight is supported by proactive reporting and effective escalation – Decision-making is supported by connected and insightful risk analysis. Risk management Our analysis of longer-term viability Our longer-term viability assessment considers several ‘severe but plausible’ scenarios contemplated within the Group’s principal risks, as well as uncertainties and their implications for the viability of the first five years (2021-25) of the Group’s business plan. The scenarios include a ‘one-off’ catastrophic event resulting from a major operational failure, for example caused by a Category 5 cyclone directly hitting the Pilbara resulting in significant operational interruption or damage. The viability of the Group’s business model remained sound under all the scenarios tested even when combined. Further detail on the assessment is provided in the Longer-term Viability Statement in our Annual Report. has the highest warming) to inform our assessments of the probability and potential impact of these physical risks in the future. Our 2018 climate change report summarised the results of our Group-wide assessment of physical climate risks to our assets. These focus on the potential exposure of the regions in which we operate through to the end of the century, both for our existing assets and future project developments. The analysis highlights that some of our operations have a high exposure to physical climate risk variables, and that these are material to Group revenue. We have many years’ experience in assessing and managing extreme weather risks and impacts, as well as in enhancing the resilience of our assets. Our 2019 climate change report provides case studies on how two of our assets are addressing these physical risks: managing cyclone risk at the Pilbara iron ore complex (acute physical risk); and managing water scarcity at the Oyu Tolgoi copper mine in Mongolia’s Gobi desert (chronic climate risk). In 2020, we postponed our plan to undertake detailed asset-level assessments of physical risk because of COVID-19 and the need to minimise travel. However, we started to develop asset-level guidance on conducting physical risk assessments. This will be piloted with projects in 2021 and then implemented across the Group. Managing acute physical risk in the Pilbara Our 2019 report describes the series of controls in place to manage the threat of extreme weather at our iron ore operations in the Pilbara in Western Australia. In 2020, we continued our work to enhance asset resilience at these operations. We started site construction works for the project to strengthen the Cape Lambert A jetty and wharf. These works also include replacing the berthing and mooring dolphins, longitudinal strengthening of the jetty and protective coating remediation. We expect to complete this in early 2022. We also completed the feasibility study for the Dampier Resilience Project and granted funding approval in December 2020. The project will be executed over the next three years, upgrading the 220kV transmission line between the Yurralyi Maya power station and Port Dampier, and developing a new bulk supply substation at Kangaroo Hill and 33kV distribution connections to Dampier and Horizon Power. Enhancing our understanding of chronic physical risks of climate change Enhancing our Resilience to Physical Climate Risk 48 49Our Approach to Climate Change Our Approach to Climate Change
Risk management, portfolio reviews, capital investment decisions, annual financial planning and our approach to government engagement all integrate our climate change strategy and execution considerations. The Board approves our climate policy and sets the Group’s ambition and emissions targets – the Chairman, Simon Thompson, has overall Board-level responsibility for our response to climate change. The Sustainability Committee of the Board is responsible for monitoring our performance against targets and ensuring operational-level resilience. It also has oversight of key sustainability areas that may be related to climate change, such as biodiversity and water, including the effectiveness of associated controls. In 2020 the Sustainability Committee discussed our industry association memberships and approved the review of industry associations and their role in climate policy. In addition, members of our Board and Sustainability Committee regularly participate in climate change discussions with civil society organisations. Climate change is a material and strategic topic for our business and is therefore part of ongoing discussion and analysis at the most senior levels of management and the Board. It is also a key topic of discussion during our regular engagements with investors and civil society organisations. Governance Board of Rio Tinto Plc Confirms the Group’s climate change strategy; approves the climate change report and policy positions; approves the Group’s short-, medium- and long-term emissions targets and goals. Sustainability Committee Monitors Group and asset performance against targets (eg GHG emissions) and progress on Scope 3 goals; ensures operational-level resilience; reviews industry association engagement. Audit Committee Reviews judgements needed to apply accounting standards, including valuations, impairments and depreciation rates; responsible for external auditors – who assure GHG emissions – and the effectiveness of the risk management framework. Remuneration Committee Ensures the remuneration structure and policies include climate-related performance metrics and reward individual executives fairly and responsibly. CEO & Executive Committee Develops the Group’s business strategy, planning, investment decisions and risk management processes. The Chief Executive is responsible for delivering the climate change strategy approved by the Board. Group Executive, Strategy & Development Group Executive, Strategy & Development is the Executive Committee member accountable for our work on climate change including strategy, portfolio implications, the Energy & Climate Change Centre of Excellence, Scope 3 value chain partnerships and external engagement. Risk Management Committee The RMC assists the Executive Committee and the Board in ensuring that a robust risk management framework exists across our business. The overall objective of the RMC is to provide oversight for the management and mitigation of the principal risks – including climate change – that could materially impact the Group’s business objectives and exceed its risk tolerances. Reports to the Audit and Sustainability Committees. Investment Committee Reviews proposals on investments, acquisitions and disposals. Approves capital decisions within delegated authority limits. Ensures integration of climate into the investment decision-making process. Planning Review Committee Reviews our short-term (12 months) and medium-term (up to 10 years) plans and integrates emissions reductions planning. The Planning Review Committee includes the Chief Executive, Chief Financial Officer, Chief Commercial Officer, Group Executive, Strategy & Development and the Chief Executives from each product group. Product groups Develop and execute decarbonisation roadmaps, manage material risks within their business activities, including asset integrity, and ensure operational and project-level performance against emissions targets. Energy & Climate Change Centre of Excellence Co-ordinates the execution of our climate strategy and provides technical support to product groups, focusing on scope 1 & 2 emissions reductions. Climate Change Steering Committee Co-ordinates Group-wide activity on climate change. Includes corporate function leads and representatives from product groups, Risk and Health, Safety, Environment & Security. Economics team Forecasts the carbon price and ensures that climate change considerations are factored into our supply, demand and price forecasts for commodities, which in turn inform our investment, valuation and impairment decisions. GovernanceGovernance Board of Rio Tinto Plc Audit Committee Risk Management Committee Energy & Climate Change Centre of Excellence Product groups Sustainability Committee Planning Review Committee Climate Strategy Steering Committee Group Executive, Strategy & Development CEO & Executive Committee Remuneration Committee Investment Committee Economics team Our Climate Change Governance 51Our Approach to Climate Change50 Our Approach to Climate Change
CA100+ Engagement with Rio Tinto Governance 1. Our 2030 target covers >95% of our Scope 1 & 2 emissions and is relative to our 2018 equity emissions baseline. Before the announcement of our 2030 targets, we reported the total Scope 1 & 2 emissions from our managed operations only. Our Chief Executive has overall responsibility for delivery of the climate change strategy approved by the Board. At the Executive Committee level, the Group Executive, Strategy & Development leads our work on climate change that is integrated into our business processes: Group strategy, capital allocation, short and medium-term planning and risk management. 35%, of which 20% relates to safety. In 2021, we will assess our climate change performance at the Group level against two categories of objectives: – Progress on our Scope 1 & 2 targets: deliver our Group-wide short-term abatement target for Scope 1 & 2 emissions of 0.5M tCO 2 e approved over 2020 and 2021; progress abatement projects and studies as per our plan. – Progress on our Scope 3 goals: work in partnerships with customers on steel decarbonisation pathways; work in partnerships to develop breakthrough technologies with potential to deliver carbon neutral steelmaking and zero carbon aluminium; ambition to reach net zero emissions from shipping of our products by 2050. Our product group CEOs’ STIPs also have a 15% weighting to environment, social and governance issues. On climate change performance, this is limited to asset-level objectives on Scope 1 & 2 emissions and includes execution of specific mitigation projects and feasibility studies, progress in major low-carbon research and development initiatives (such as ELYSIS™ and low-carbon vehicle trials), and evaluation of power options. Engaging with investors In 2018, we welcomed the recommendations from the Task Force on Climate-related Financial Disclosures (TCFD) and aligned our climate change disclosures to provide more transparency to our investors, other financial institutions and our stakeholders more broadly. In addition, our Chief Executive and Group Executive, Strategy & Development led an investor seminar on climate change and water in April 2020, attended by over 150 investors. We regularly engage with the Climate Action 100+ (CA100+) group of investors at Board, Executive Committee and climate team levels. These investors are seeking more robust and comparable information on how companies are realigning their business strategies and operations with the goals of the Paris Agreement, and a net zero emissions future. In September 2020, the CA100+ published a Net Zero Company Benchmark that sets out ten indicators covering emissions targets and goals, capital stock alignment, decarbonisation strategy, governance, advocacy and disclosure. This new benchmark aligns well with our recent engagements with investors on climate change. It is also encouraging that it starts to consolidate some existing frameworks to assess corporate climate change performance into what could potentially become a business standard. We hope that this evolving benchmark will address sector-specific issues and the complexity of comparing companies with diverse portfolios in a manner that is fair, transparent and fit-for-purpose. We are supporting CA100+ as it develops the benchmark and the approach to evaluating diversified mining companies against it. In response to the request from CA100+, we confirmed the following: 1. As a supporter of the TCFD recommendations, we will work towards providing disclosures that are consistent with the new CA100+ benchmark. 2. The CA100+ calls on companies to reduce emissions by 45% relative to 2010 levels by 2030 which aligns with the emissions pathway described in the Intergovernmental Panel on Climate Change report on 1.5°C. Our target to reduce absolute Scope 1 & 2 emissions by 15% compared with 2018 levels by 2030 is expected to be consistent with this objective. 3. We are already partnering to tackle emissions across our value chains and so welcome the opportunity to join investors in the development and implementation of net zero transition action plans. Climate has been an important consideration for our Investment Committee since 1998, when we adopted a notional carbon price to test the resilience of our capital investments. As a consequence, our capital stock, our portfolio of products, and the focus on carbon neutral growth is well aligned with the low-carbon transition. The work required to achieve our 2030 targets and deliver our decarbonisation strategy is now integrated into our short-term (12 months) and medium-term (five years) planning process. The Planning Review Committee, which includes a sub-set of Executive Committee members, oversees this work to review progress on emissions and set annual targets and aims to ensure that our product groups and emissions abatement projects remain on track. The Energy & Climate Change Centre of Excellence Co-ordinates the work at the Group level and provides technical support to the product groups which are accountable for delivering the emissions abatement projects. It also focuses on monitoring and supporting the progress by the product groups on projects and studies, as well as expenditure of the $1bn committed to climate-related projects (both capex and opex). The Group Technical Surface Mining and Processing Centre’s of Excellence support the R&D programmes for each product group, including technologies that will support the Group’s long-term decarbonisation effort and 2050 net zero ambition. Strengthening the link between executive remuneration and our climate performance Since 2018, our Chief Executive’s performance objectives have been reflected in the Short Term Incentive Plan (STIP) that includes delivery of the Group’s strategy on climate change. These are cascaded down into the annual objectives of relevant members of the Executive Committee and other members of senior management. This year, the Remuneration Committee approved revisions to how we include climate change in the STIP. Safety, environment, social and governance matters including climate change are now assigned an explicit performance weighting of Management Roles and Responsibilities Key actions The Sustainability Committee met six times in 2020. Approximately 12% of its time focused on environment and climate change. Approved 2030 targets and net zero ambition Remuneration Committee approved revisions to the way climate change is integrated into executive incentives Engaged with investors and civil society organisations following the publication of our climate strategy and 2030 targets Approved 2019 climate change report and reviewed approach to industry associations Established the position of Group Executive, Strategy & Development – the Executive Committee member with lead accountability for climate change strategy and execution Integrating climate change in the preparation of Company accounts “The directors have considered the relevance of the risks of climate change and transition risks associated with achieving the goals of the Paris Agreement when preparing and signing off the Company’s accounts. The Audit Committee reviews and approves all material accounting estimates and judgements relating to financial reporting, including those where climate issues are relevant. Climate change risk is embedded in our central case commodity price forecasts which underpin our accounting judgments and are particularly important in respect to impairment testing and our assessment of mineral reserves and resources. The central case forecasts include carbon price assumptions that are derived from our three scenarios (Realpolitik 2.0, Society 3.0 and Technology 4.0). As only one of these scenarios is aligned with the goals of the Paris Agreement, our central case carbon prices are not consistent with the expectation of climate policies required to meet those goals. Currently, the pace of decarbonisation across the global economy is uncertain and existing climate policies in many countries are not aligned with stated ambitions. The narrative reporting on climate-related matters is consistent with the accounting assumptions and judgments made in this report.” Extracted from the Audit Committee Report (see Annual Report page 135) Governance “ Rio Tinto is covered by the Climate Action 100+ (CA100+). This global initiative is backed by over 500 investors with more than $50tn in assets under management. We are asking systemically important companies to work with investors to improve their governance, disclosure, and alignment with the Paris Agreement. We welcome the company’s operational net zero commitment and demonstration that the associated 2030 targets are in line with the 2018 IPCC 1.5°C Special Report. The further information about key value-chain partnerships, designed to deliver commercial-scale demonstration of the decarbonisation of the aluminium and steel value chains, is critical to investors as we action our own portfolio level net zero commitments. In the run up to COP26 in Glasgow, we welcome both: Rio Tinto’s co- ordination with sector experts in the High-Level Champions team; and the Board’s intention to put the company’s annual TCFD- aligned reporting to an advisory vote at its 2022 AGMs, as legislators and regulators in the UK and elsewhere respond to calls for investors to have a ‘Say on Climate’. We look forward to reviewing Rio Tinto’s new remuneration policy from a climate perspective, and working with the sector to develop a tailored CA100+ net zero benchmark, including within the context of wider work on metals value-chains. Stronger Paris-aligned policy advocacy in contexts where the company and its peers have considerable direct and indirect influence would be welcomed. As co-leads of the CA100+ process with Rio Tinto we believe that it continues to be mutually beneficial, and we look forward to our 2021 engagement.” Andrew Gray Director – ESG & Stewardship, AustralianSuper and Member, CA100+ Global Steering Committee Rupert Krefting Head of Corporate Finance & Stewardship, M&G Investments and Member, CA100+ European Advisory Group Helen Wildsmith Stewardship Director – Climate Change, CCLA and Member, CA100+ European Advisory Group 52 53Our Approach to Climate Change Our Approach to Climate Change
Government policy that creates the right framework for change is critical, coupled with real business action and societal shifts. A challenge as serious as climate change requires transparency, collaboration and a shared contribution to the solution. Our positions on key climate and energy policy issues are: Issue Rio Tinto’s position Climate science We accept mainstream climate science assessed by the Intergovernmental Panel on Climate Change and the fact that climate change is occurring and is largely caused by human activities. We acknowledge the IPCC’s report on 1.5°C and their recommendation to aim for net zero emissions by 2050. Paris Agreement We support the outcomes of the Paris Agreement and the long-term goal to limit global average temperature rise to well below 2°C and pursue efforts to limit the temperature increase to 1.5°C above pre-industrial levels. We support governments as they raise the ambition of their Nationally Determined Contributions (NDCs). The role of business Significant progress towards a solution to climate change will only occur where there is broad engagement involving the breadth of experience and opinion from business, governments, investors, civil society organisations and consumers. Business has a role to play in addressing and managing the risks and uncertainties of climate change. Emissions and energy reduction targets and standards It is important to set targets, take action to achieve them, and report on progress against targets. We do not advocate for policies that undermine the Paris Agreement or discount NDCs. Our ambition is to reach net zero emissions across our operations by 2050. Adapting to climate change We recognise the importance of adaptation and increasing resilience to a changing climate. Market mechanisms and emissions trading Where climate policies are implemented, we support the use of market mechanisms, including a market-based price on carbon such as in emissions trading systems. We believe this is the best way of stimulating innovation and achieving emissions reductions at least cost. Competitiveness Effective climate policies should incentivise the private sector to invest in low-carbon technology, while avoiding the negative unintended consequences of transferring industrial production to countries with weaker emissions regulation. Where climate regulation, such as carbon pricing, is introduced to incentivise the decarbonisation of ‘hard to abate’ sectors, this should be coupled with measures to maintain the competitiveness of emissions intensive trade-exposed industries to minimise competitive distortions within and across jurisdictions. Energy policy and energy efficiency Rio Tinto will promote alignment with its climate and energy policy in its discussions with industry association members. We recognise the valuable contribution that renewable energy sources make in reducing emissions. Many of our operations are energy intensive and we have been taking action to improve both productivity and energy efficiency, as we reduce emissions. Governance “ Integrating climate change into executive remuneration is an important step.” Simon Thompson Chairman Climate and energy policy advocacy Significant global and regional progress on climate change will only happen when everyone – business, governments, investors, civil society organisations and consumers – plays their part. Our own approach to climate change requires active engagement on relevant policies with a range of stakeholders in the countries where we operate. Our responses to government consultations are guided by our overall policy positions that include support for market mechanisms, as we believe this is the best way of stimulating innovation and achieving emissions reductions at least cost. Our submissions are typically developed by subject matter experts, reviewed by government relations and legal teams, and then approved by the relevant country director or senior executive. In 2020, we responded directly to four national and sub-national government consultations on climate and energy policy: Date National or sub-national government Details of consultation January 2020 National Government of New Zealand Legislative consultation: The New Zealand Government sought feedback on amendments to the Climate Change Response Act 2002 to improve the operation of the New Zealand Emissions Trading Scheme (NZ ETS). Our response can be found here. February 2020 Ministry for the Environment – New Zealand Consultation Paper: The Ministry for the Environment sought feedback on proposed NZ ETS settings, including unit supply and price controls, to be set through regulations in mid-2020. Our response can be found here. June 2020 Federal Government of Australia – Department of Industry, Science, Energy & Resources Discussion Paper: Technology Investment Roadmap. This outlines the Government’s vision “for Australia to play a leadership role in accelerating development and deployment of low emissions technologies”. Our response can be found here. September 2020 Energy Security Board (tasked by the Energy Council of the Council of Australian Governments) Consultation paper on the market design of the National Electricity Market. Our response can be found here. Our Position on Climate Change In 2015, we supported the adoption of the Paris Agreement and the long-term goal to limit global average temperature rise to well below 2°C and to pursue efforts to limit warming to 1.5°C. Governance 55Our Approach to Climate Change54 Our Approach to Climate Change
Working with our industry associations Industry associations play an important role in policy development, sharing best practice and developing standards. They also allow us to better understand a range of external views and contribute our perspectives and experiences in support of a co-ordinated approach which benefits business, the economy and society. We recognise that there is increasing stakeholder interest in industry associations and the role they play in policy advocacy. Each industry association is different. Some focus on a thematic mandate and promote best practice in a given domain, others gather a broader set of companies and represent a sector’s interest to government, policy makers and other stakeholders. Our participation across different industry associations also varies – we are more active in associations on issues where we can benefit, influence and add value. Positions taken by industry associations on a given topic will consider a range of members’ views, and the nuance and emphasis of an industry association’s position may differ from that of Rio Tinto. Diverse and differing views should be heard in order to support rich and full debate, reach compromises where appropriate, and make progress on solutions to complex issues. We encourage industry associations to engage broadly with other stakeholders (such as investors and non-government organisations). Governance of our memberships of industry associations Recognising that industry associations’ views will not always be the same as ours, we monitor the advocacy of industry associations and periodically review our memberships. This assessment may include: – the purpose of the association and the value that the membership may provide to Rio Tinto and its investors; – appropriate governance structures within the industry association; and – activities and positions of advocacy of the industry association. Where significant differences in policy positions arise, we may: – provide greater clarity on our own policy positions, such as Company submissions on policy issues and/or direct engagement with policy makers; – work as part of that industry association to understand alternative points of view and to seek common ground that enables progress to be made; – seek a leadership position in the governance body of that industry association to further influence the policies and perspectives of that association; and/or – ultimately, and if formal dialogue processes appear incapable of resolving such differences in positions, review our ongoing membership of that industry association. Our annual review of our industry association memberships supplements this report and can be found on our website. This provides a complete list of the major industry associations that take positions on climate change and sets out the elements used to evaluate their policy positions and advocacy: 1. accept mainstream climate science; 2. advance the Paris Agreement goals to hold the increase in the global average temperature to well below 2°C above pre-industrial levels and pursue efforts to limit the temperature increase to 1.5°C above pre-industrial levels; 3. support governments as they raise the ambition of their Nationally Determined Contributions; 4. support market mechanisms, including carbon pricing, that stimulate innovation and cost-effective emissions reductions and minimise competitive distortions within and across sectors and jurisdictions; 5. recognise the valuable contribution that renewable energy sources make in reducing emissions, not undermine the role renewables have in the energy mix; and 6. ensure that any positions and advocacy on the use of coal do not support subsidies and note that it will require advanced technology, and in the medium to long term must be consistent with Paris targets. The review provides further information on any major industry associations whose positions and advocacy on climate and energy policy significantly differ from Rio Tinto’s key positions on these issues. Industry association policy and advocacy alignment Where our membership is significant, we will work in partnership with industry associations to ensure that their policy positions and advocacy are consistent with our own public position and the Paris Agreement. In accordance with the provisions governing the monitoring of our industry association memberships, we will consider our support and membership of industry associations where they do not partner with us in seeking to advance the above policy agenda. Governance Our Position on Climate Change continued CA100+ Net Zero Company Benchmark Disclosures Emissions and Energy Data 56 Our Approach to Climate Change 57Our Approach to Climate Change
Climate Action 100+ Net Zero Company Benchmark Disclosures Climate Action 100+ Net Zero Company Benchmark Indicators & sub-indicators Our approach 1 Net zero GHG emissions by 2050 (or sooner) ambition Sub-indicator 1.1 – The company has set an ambition to achieve net zero GHG emissions by 2050 or sooner Our ambition is to reach net zero emissions across our operations (ie Scope 1&2 emissions) by 2050. We also aim to reach net zero emissions from shipping of our products by 2050. 2 Long-term (2036 to 2050) GHG reduction target Sub-indicator 2.1 – The company has set long-term (2036 to 2050) targets or goal for reducing its GHG emissions As noted above, our long term ambition is to reach net zero emissions by 2050 and we have quantitative targets to reduce Scope 1&2 emissions between now and 2030. We have not set a quantitative GHG reduction target after 2030. The 2030 target drives mitigation action in the short to medium term (described on pages 26-29 of our 2020 climate report). Our net zero ambition (by 2050) drives our approach to carbon neutral growth and our investment in longer-term R&D in mitigation technology (such as ELYSIS™ and low-carbon vehicles) which will play a more significant role in decarbonising our business post-2030. Our Scope 1&2 decarbonisation pathway to 2050 is outlined on pages 30-33 of our 2020 climate report. We have also set some long-term Scope 3 goals for emissions related to the processing of our iron ore, bauxite and alumina products, which account for more than 95% of our overall Scope 3 inventory. These goals are to support the development of carbon neutral steelmaking and aluminium smelting technologies as described on pages 35-45 of our 2020 climate report. Sub-indicator 2.2 – The long-term (2036 to 2050) GHG reduction target or goal covers more than 95% of scope 1 and 2 emissions, and relevant scope 3 emissions (where applicable) Our long-term ambition to reach net zero emissions across our operations by 2050 covers more than 95% of our Scope 1&2 emissions Sub-indicator 2.3 – The target or goal is aligned with the goal of limiting global warming to 1.5°C Our long-term ambition to reach net zero emissions across our operations by 2050 is aligned with the pathway in the IPCC Special Report on 1.5C 3 Medium-term (2026 to 2035) GHG reduction target(s) Sub-indicator 3.1 – The company has set a medium-term (2026 to 2035) targets for reducing its GHG emissions In February 2020, we announced new Group-wide 2030 targets for Scope 1&2 GHG emissions. These are a 30% reduction emissions intensity; and a 15 per cent reduction in absolute emissions compared to our 2018 equity emissions baseline. In 2021, we announed new Scope 3 goals to work in partnerships with our customers and invest in technologies that could deliver reductions in steelmaking carbon intensity of at least 30% from 2030. We have also committed to meeting the IMO goal of a 40% reduction in shipping emissions intensity of our products by 2030. Sub-indicator 3.2 – The medium-term (2026 to 2035) GHG reduction target covers more than 95% of scope 1 and 2 emissions, and relevant scope 3 emissions (where applicable) Our 2030 targets apply to more than 95% of our total scope 1&2 emissions on an equity basis. Our approach to tackling emissions across our value chain is described on pages 35-45 of our 2020 climate change report. The most significant category of scope 3 emissions is “processing of sold products” (category 10 of the WRI WBCSD GHG Protocol on scope 3 emissions) which accounts for more than 97% of our total scope 3 emissions. Details of our Scope 3 emissions by category can be found in our 2020 Scope 1, 2 & 3 Emissions Calculations Methodology report. Sub-indicator 3.3 – The target is aligned with the goal of limiting global warming to 1.5°C Given the reductions we have achieved since 2010, our 2030 targets for scope 1&2 emissions are aligned with reductions of 45% relative to 2010 levels by 2030 and the emissions pathway described in the IPCC’s Special Report on 1.5°C. 4 Short-term (2020 to 2025) GHG reduction target Sub-indicator 4.1 – The company has set a short-term (2020 to 2025) targets for reducing its GHG emissions The Group’s short-term Scope 1 & 2 target is to approve 0.5M tCO 2 e of abatement projects over 2020 and 2021. We have also committed to spend $1bn on emission reduction initiatives over the period 2020 to 2024. Finally, we have set some 2025 milestones for our Scope 3 goals to 1. establish and advance four steel value chain partnerships, 2. participate in the advancement of at carbon neutral steelmaking technology to industrial pilot scale, and 3. progress the zero-carbon ELYSIS™ technology to commercialisation stage. Climate Action 100+ Net Zero Company Benchmark disclosures Indicators & sub-indicators Our approach Sub-indicator 4.2 – The short-term (2020 to 2025) GHG reduction target covers more than 95% of scope 1 and 2 emissions, and relevant scope 3 emissions (where applicable) The short-term target applies to >95% of our scope 1&2 emissions. The Short Term Incentive Plan (STIP) includes the delivery of the Group’s strategy on climate change and annual targets (further detail is provided in the remuneration section of the Annual Report). Sub-indicator 4.3 – The target or objective is aligned with the goal of limiting global warming to 1.5°C The target is linked to our short-term plan and should not be extrapolated to either our 2030 target or to our net zero ambition by 2050. The Group’s Scope 1 & 2 emissions pathway in the short-term is not expected to be a straight line to our 2030 target (given the timing of capital expenditure and potential mergers and acquisitions activity). 5 Decarbonisation strategy – a robust plan to achieve GHG targets lays out which decarbonisation levers will be used Sub-indicator 5.1 – The company has a decarbonisation strategy to meet its long, medium and short-term GHG reduction targets (note scoring under this indicator requires scoring on targets indicators 2, 3 and/ or 4) Our decarbonisation strategy is described on pages 23-33 of our climate change report. This quantifies the main sources of Scope 1 & 2 emissions and identifies the short-, medium- and long-term actions needed to reach our ambition to achieve net zero emissions by 2050 and our 2030 targets. The report also highlights the actual and committed spend of over $140m in 2020 on mitigation projects and R&D (out of the $1bn expected for climate- related spend over five years 2020-24). At the Group-level, the two most important decarbonisation levers between now and 2030 are: 1. To continue switching the electricity we generate and purchase to renewables, and 2. To optimise processing plants in our alumina and minerals businesses and start trialling new technologies to reduce emissions from the use of coal and natural gas for process heat. In the longer term, we will need to continue the shift to low-carbon power and decarbonise heat at our alumina refineries and minerals processing facilities. Our Processing Centre of Excellence is particularly focused on technologies like hydrogen or plasma torches, which can use renewable energy, and which may provide a pathway to replace fossil fuels for heat and steam. We will also need to address emissions from the use of anodes in our aluminium smelters. We established the ELYSIS partnership in 2018 with Alcoa and with support from Apple and the governments of Canada and Quebec to develop the world’s first carbon-free aluminium smelting process, using inert anodes instead of carbon. Pages 35-45 of our climate change report quantifies the main categories of scope 3 emissions and explains our goals to work in partnerships across our value chain to reduce the carbon footprint. Sub-indicator 5.2 – The company’s decarbonisation strategy includes a commitment to ‘green revenues’ from low- carbon products and services Our purpose is to produce materials essential to human progress. There are no low-carbon alternatives to steel, aluminium and copper in numerous applications and these materials are essential to the low-carbon transition, so the challenge is to produce them sustainably. On page 18-19 of our climate change report, we have outlined an approach to classifying the revenue from products of the resource sector: Type 1: No carbon in product sold, low process CO 2 intensity and critical enabler of low-carbon future (eg copper, aluminium, battery minerals) Type 2: No carbon in product sold and best-in-class process CO 2 intensity today (eg iron ore DR pellets, bauxite and alumina for hydro-based aluminium, high grade TiO2) Type 3: No carbon in product sold but CO 2 intensive processing today (eg iron ore fines and lump, bauxite and alumina for coal-based aluminium) Type 4: Carbon in product sold but hard to substitute today (eg metallurgical coal) Type 5: Carbon in product sold and widely substitutable today (eg thermal coal, oil and gas) The percentage of our revenues from the different types of materials is provided on page 19 of our report. We do not produce fossil fuels and so have no revenue from Type 4 or Type 5 materials. Rio Tinto sells low-carbon branded metal products including RenewAL and the recently launched START Responsible Aluminium. We have targets to increase these ‘green revenues’, though they are not disclosed publicly and currently represent a small (<5%) proportion of our total revenue. RenewAL is the certified CO 2 content per ton of Aluminium (4tCO 2 e per tonne of aluminium compared with the industry average of over 12tCO 2 e) which helps ensure that materials recycled later had the right origin. START Responsible Aluminium sets the standard for responsible aluminium production, providing transparency, traceability and provenance through blockchain technology, empowering customers, consumers and end users to make a more sustainable choice. 58 59Our Approach to Climate Change Our Approach to Climate Change
Indicators & sub-indicators Our approach 6 Capital stock alignment – assess whether investment in carbon-intensive activities is consistent with the Paris Agreement Goals Sub-indicator 6.1 – The company is working to decarbonise its capital stock Climate risks and opportunities have formed part of our strategic thinking and investment decisions for over two decades, and we now have a portfolio that is well positioned for the transition to a low-carbon economy. In 2018 we made significant progress to decarbonise our capital stock when we completed the divestment of the last of our coal businesses and no longer produce fossil fuels. In 2020 we committed to invest $1 billion in climate related projects over five years 2020-24, and we expect to invest further capital to achieve our 2030 targets. This will include capital and operational expenditure on projects such as Gudai-Darri Solar, the development of the ELYSIS™ technology and R&D in low-carbon technologies. Rio Tinto's purpose is to produce materials essential for human progress. Page 19 of the climate report highlights the proportion of our growth capex in materials such as copper and lithium which will play a critical role in enabling the low-carbon transition. Sub-indicator 6.2 –The company discloses the methodology used to determine the Paris Agreement alignment of its future capital expenditures As our long term ambition to reach net zero emissions from our operations is aligned with the Paris Agreement, we expect our future capital expenditure to support that ambition. Our strategic thinking is framed by scenarios, including detailed climate change narratives, and considers pathways aligned with the Paris goals. Climate change considerations are therefore fully integrated into our Group strategy and portfolio decisions. In fact, climate has been an important consideration for our Investment Committee since 1998, when we adopted a notional carbon price to test the resilience of our capital investments. As a consequence, our capital stock, our portfolio of products, and the focus on carbon neutral growth is well aligned with the low-carbon transition. (further detail on the carbon price assumptions are provided on page 21 of the climate report). As part of our 2030 Scope 1 & 2 targets we have also committed for all future growth projects at Rio Tinto to be carbon neutral overall. As noted in indicator 5.2 above, we have outlined an approach to classifying our materials. We have used this approach to assess our portfolio and indicate the percentage of our growth capex in each category of material. Further detail is provided on page 18-19 of our climate change report 7 Climate policy engagement – intent to support climate policy and demonstrate how direct and indirect lobbying is consistent with this position Sub-indicator 7.1 – Comprehensive description of the position the company has taken on all relevant climate- related policies, the activities undertaken during policy engagement and a detailed explanation of how this process is governed, including, but not limited to, the following: In 2015, we supported the adoption of the Paris Agreement and the long-term goal to limit global average temperature rise to well below 2°C and to pursue efforts to limit warming to 1.5°C. Our positions on key climate and energy policy issues are approved by the Board and are summarised on page 54 of our 2020 climate change report. These positions address all the areas of climate policy listed in the assessment criteria. In 2020, we responded directly to four national and sub-national government consultations on climate and energy policy. These are listed on our website and on page 55 of the climate change report. Our responses to government consultations are guided by our overall policy positions and are typically developed by subject matter experts, reviewed by government relations and legal teams and approved by the relevant country director or senior executive with responsibility for that subject. Sub-indicator 7.2 – Disclosure of indirect climate policy engagement positions, activities and governance processes, including the following: The governance section of the 2020 climate change report describes the governance process in place for memberships of industry associations and indirect climate policy engagement. Recognising that industry associations’ views will not always be the same as ours, we periodically review our memberships in individual industry associations and report on whether they align with us on climate-related advocacy. This review, published on our website, sets out our approach where significant differences in policy positions arise. Where significant differences in policy positions arise, we may: – provide greater clarity on our own policy positions, such as company submissions on policy issues and/or direct engagement with policy makers; – work as part of that industry association to understand alternative points of view and to seek common ground that enables progress to be made; – seek a leadership position in the governance body of that industry association to further influence the policies and perspectives of that association; and/or – ultimately, and if formal dialogue processes appear incapable of resolving such differences in positions, review our ongoing membership of that industry association. Climate Action 100+ Net Zero Company Benchmark disclosures Climate Action 100+ Net Zero Company Benchmark disclosures Indicators & sub-indicators Our approach 8 Climate Governance – Clear Board oversight of and remuneration for delivery of GHG targets Sub-indicator 8.1 – Board oversight of climate change The Board approves our climate policy and sets the Group’s ambition and emissions targets. Simon Thompson, the Chairman, has overall Board-level responsibility for our response to climate change. The Sustainability Committee of the Board is responsible for monitoring our performance against targets and ensuring operational- level resilience. The Sustainability Committee met 6 times in 2020 and devoted approximately 12% of its time to environment and climate change matters (full data is available on the SusCo tab of this file). The Chief Executive is responsible for delivering the climate change strategy approved by the Board and reports to the Board on progress. Sub-indicator 8.2 – The company’s executive remuneration scheme incorporate climate change performance elements Since 2018, our chief executive’s performance objectives have been reflected in the Short Term Incentive Plan (STIP) that includes delivery of the Group’s strategy on climate change. In 2021, the Remuneration Committee approved revisions to how we include climate change in the STIP. Safety, environment, climate change, social and governance matters are now assigned an explicit performance weighting of 35% (of which 20% relates to safety). In 2021, we will assess our climate change performance at the Group level against two categories of objectives: 1. Progress on our scope 1 & 2 targets: deliver our Group-wide short-term abatement target for scope 1 & 2 emissions of 0.5M tCO 2 e of approved abatement projects over 2020 and 2021. 2. Progress our value chain partnerships and scope 3 goals as outlined on page 36-37 of our 2020 climate report. 3. Our product group CEOs’ STIPs also have a 15% weighting to environment, social and governance issues. On climate change performance, this is limited to asset-level objectives on scope 1&2 emissions and includes execution of specific mitigation projects and feasibility studies, progress in major low-carbon research and development initiatives, and evaluation of low-carbon power options. Sub-indicator 8.3 – The Board has sufficient capabilities to assess and manage climate-related risks and opportunities The Board skills matrix on page 130 of the 2020 Annual Report explicitly considers capabilities to assess and manage climate-related risks and opportunities. Six members of the B oard have relevant skills and experience in addressing climate change and low-carbon transition issues. Climate change is also considered in the Board effectiveness review. Further detail is provided in the governance section of our 2020 Annual Report and the Board members’ biographies. 9 Just transition – Consideration of the impacts from transitioning to a lower-carbon business model on its workers and communities Sub-indicator 9.1 – The company discloses its considerations of the impacts from transitioning to a lower-carbon business model on its workers and communities We believe that the low-carbon transition must accelerate business action, be socially inclusive and address impacts on competitiveness. In some cases, trying to accelerate emissions reductions could have the undesirable outcome of promoting plant closures and reducing employment. This would have a particularly negative impact on remote communities who often rely on mining and industrial activities for their livelihoods. We do not have an explicit position on ‘just transition’. However, we address related stakeholder issues in our approach to closure. Although it may extend over decades, mining is a temporary land use. It is therefore a priority that we plan for the closure of our operations when the commercially recoverable ore and associated processing capacity is exhausted. All Rio Tinto businesses plan for closure from the earliest stages of project development. This planning is intended to minimise financial, social and environmental risks when the operation eventually closes and optimise social, economic and cultural opportunities for the host community. 10 TCFD Disclosure – TCFD aligned climate disclosures that incorporate the specific items outlined above and wider climate strategy Sub-indicator 10.1 – The company has committed to implement the TCFD recommendations Rio Tinto supports the TCFD recommendations and we re-affirmed our commitment to align our climate disclosures with them to CA100+ in October 2020. Our climate change report aligns with the TCFD recommendations and includes sections on governance, strategy, risk management and metrics and targets. The TCFD tab in this Fact Book lists the TCFD recommendations and indicates where our relevant disclosures are (in the climate change report and Annual Report). Sub-indicator 10.2 – The company employs climate scenario planning to test its strategic and operational resilience Detail of our approach to scenario planning and testing our strategic and operational resilience is provided on pages 11-21 of our climate change report. This includes quantitative elements (for some of our input assumptions) as well as the implications of these scenarios for our portfolio. We use three global dimensions to develop our Group strategy scenario framework and these result in a range of possible climate change outcomes which we include in our planning. Under one scenario – Society 3.0 – warming is limited to below 2°C and is therefore Paris-aligned. We also consider external scenarios, such as the IEA new NZE2050 scenario, that explore faster energy transitions. Through our strategy process we test the resilience of our portfolio against each of these three scenarios. Overall, our scenario is expected to perform more strongly in scenarios with proactive climate action. 60 61Our Approach to Climate Change Our Approach to Climate Change
Emissions and Energy data Emissions and Energy Data Scope 1&2 emissions – equity basis Total equity greenhouse gas emissions (million tCO 2 e) 2020 2019 2018 Total emissions 31.5 31.5* 32.6a Scope 1 emissions 22.8 23.1 23.8 Scope 2 emissions 8.7 8.3 8.8 2020 equity greenhouse gas emissions by product group (million tonnes of CO 2 equivalent) Scope 1 emissions (Mt CO 2 -e) Scope 2 emissions (Mt CO 2 -e) Total emissions (Mt CO 2 -e) Aluminium 15.8 6.0 21.8 Aluminium (Pacific) 4.6 5.4 10.1 Aluminium (Atlantic) 5.2 0.1 5.3 Bauxite & Alumina 6.0 0.5 6.4 Energy & Minerals 2.4 1.2 3.6 Iron Ore 3.0 0 3.0 Copper & Diamonds 1.2 1.5 2.7 Other (includes Growth & Innovation and corporate functions) 0.5 0 0.5 Rio Tinto total 22.8 8.7 31.5 2020 equity greenhouse gas emissions by location (million tonnes of CO 2 equivalent) Scope 1 emissions (Mt CO 2 -e) Scope 2 emissions (Mt CO 2 -e) Total emissions (Mt CO 2 -e) Australia 12.8 5.9 18.6 Canada 6.0 0 6.0 South Africa 0.3 1.2 1.6 USA 1.1 0 1.1 Other: Rest of Africa 0.2 0 0.2 Other: Rest of Europe 0.4 0 0.4 Other: Asia, New Zealand, Central America, South America 2.1 1.6 3.7 Rio Tinto total 22.8 8.7 31.5 Scope 1&2 emissions intensity – equity basis 2020 2019 2018 Greenhouse gas emissions intensity (tCO 2 e/t Cu-eq)(equity) 6.4 6.4 6.5 Scope 1&2 emissions & energy – 100% managed basis 2020 2019 2018 2017 2016 2010 Total managed greenhouse gas emissions (Mt CO 2 e) 26.2 26.4 28.5* 30.6 32.0 43.0 Total managed energy (PJ) 402 406* 425 440 458 Note: Total managed GHG emissions equal the sum of scope 1 emissions and scope 2 emissions minus the scope 1 emissions resulting from the supply of electricity and steam to third parties. * Numbers restated from those originally published to ensure comparability over time. In 2008, we set our first climate change target, to reduce the GHG emissions intensity of our managed operations. This was updated in 2015 and called for a 24% reduction in intensity by 2020 and we achieved that target. In 2020 our emissions intensity was 72.6 (index relative to 2008). Scope 3 emissions – equity basis 2020 Total equity Scope 3 emissions (Mt CO 2 e) 519.4 Sources of scope 3 equity emissions (2020) million tonnes of CO 2 -e 1. Purchased goods and services 6.6 2. Capital goods 0.1 3. Fuel and energy related activities 2.8 4. Upstream transportation and distribution 5.1 5. Waste generated in operations Not applicable 6. Business travel 0.14 7. Employee commuting Included in category 6 8. Upstream leased assets Not applicable 9. Downstream transportation and distribution 3.0 10. Processing of sold products – Iron ore 376.4 – Bauxite & alumina 116.4 – Titanium dioxide 5.8 – Copper 0.6 – Other 2.5 11. Use of sold products 0 12. End of life treatment of sold products Not material 13. Downstream leased assets Not applicable 14. Franchises Not applicable 15. Investments Not applicable Coal 15% Natural gas 8% Diesel 1% Others 1% Other renewable 4% Hydro 71% Process gases and other 4% Anodes and reductants 23% Net purchases electricity and steam 35% Fuel 38% 2020 sources of electricity used (managed operations) Restatement of 2018 emissions baseline and progress towards our 2030 targets 2020 sources of emissions (managed operations) 31.5 31.0 32.0 32.5 33.0 2 0 1 8 R ep o rted E scon dida restatem en t M arin e restatem en t N on - m an aged assets 2 0 1 8 A d ju sted K U C R ecs A lu m in a operation s A lu m in iu m O th er 2 0 1 9 R T IO R TA R TC D R T E M 2 0 2 0 31.8 0.3 0.3 0.2 32.6 (0.84) (0.32) (0.08) 0.12 31.5 0.18 0.09 (0.03) (0.16) 31.5 The 2018 figures of 32.6Mt CO2e and 6.5Mt CO2e/t Cu-eq are the baselines for our emissions targets. In our 2019 climate change report these values were 31.8Mt CO 2 e and 6.4Mt CO 2 e/t Cu-eq and have been restated as a result of the following events: – Rio Tinto Marine restated their 2018 scope 1 emissions following a review of their scope 1 and scope 3 emissions – Escondida restated their scope 2 emissions as a result of a change from the location approach to estimating scope 2 emissions to the market approach – In 2020 various non-managed assets provided clearer details of their 2018 emissions, resulting in a net gain in Rio Tinto’s equity emissions for 2018, which has replaced emission estimates used previously by Rio Tinto The reductions achieved in 2019 were primarily due to reductions at Kennecott (where RECs were the major contributor to reductions in Scope 2 emissions) and at QAL, Yarwun and Vaudreuil (down over 300kt jointly) partly due to operational changes and slight reductions in production. In 2020 emissions increased in our iron ore business which had higher diesel consumption due to longer haul distances and the development of the Gudai-Darri mine, but these were offset with modest reductions in emissions in the other parts of the group due to reductions in production. Note: Scope 1 greenhouse gas emissions are direct greenhouse gas emissions from our operations (eg from fuel consumption and anodes). Scope 2 greenhouse gas emissions from the electricity, heat or steam brought in from third parties (indirect emissions). Scope 3 emissions are indirect greenhouse gases generated as a result of activities undertaken across the value chain, either upstream or downstream of our operations. (a) The 2018 figure is the baseline for our 2030 emissions target and has been adjusted to exclude emissions from assets divested in that year. Actual emissions in 2018 were 34.0Mt CO2e. Please see our Scope 1,2&3 Emissions Methodology report for further detail on our approach to calculating our emissions. 62 63Our Approach to Climate Change Our Approach to Climate Change
This report includes “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. All statements other than statements of historical facts included in this report, including, without limitation, those regarding Rio Tinto’s financial position, business strategy, plans and objectives of management for future operations (including development plans and objectives relating to Rio Tinto’s products, production forecasts and reserve and resource positions), are forward-looking statements. The words “intend”, “aim”, “project”, “anticipate”, “estimate”, “plan”, “believes”, “expects”, “may”, “should”, “will”, “target”, “set to” or similar expressions, commonly identify such forward- looking statements. Such forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Rio Tinto, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such forward-looking statements are based on numerous assumptions regarding Rio Tinto’s present and future business strategies and the environment in which Rio Tinto will operate in the future. Among the important factors that could cause Rio Tinto’s actual results, performance or achievements to differ materially from those in the forward-looking statements are levels of actual production during any period, levels of demand and market prices, the ability to produce and transport products profitably, the impact of foreign currency exchange rates on market prices and operating costs, operational problems, political uncertainty and economic conditions in relevant areas of the world, the actions of competitors, activities by governmental authorities such as changes in taxation or regulation and such other risk factors identified in Rio Tinto’s most recent Annual report and accounts in Australia and the United Kingdom and the most recent Annual report on Form 20-F filed with the United States Securities and Exchange Commission (the “SEC”) or Form 6-Ks furnished to, or filed with, the SEC. Forward-looking statements should, therefore, be construed in light of such risk factors and undue reliance should not be placed on forwardlooking statements. These forward-looking statements speak only as of the date of this report. Rio Tinto expressly disclaims any obligation or undertaking (except as required by applicable law, the UK Listing Rules, the Disclosure Guidance and Transparency Rules of the Financial Conduct Authority and the Listing Rules of the Australian Securities Exchange) to release publicly any updates or revisions to any forward-looking statement contained herein to reflect any change in Rio Tinto’s expectations with regard thereto or any change in events, conditions or circumstances on which any such statement is based. Nothing in this report should be interpreted to mean that future earnings per share of Rio Tinto plc or Rio Tinto Limited will necessarily match or exceed its historical published earnings per share. Forward Looking Statements Designed and produced by Black Sun riotinto.com 64 Our Approach to Climate Change
Rio Tinto plc 6 St James's Square London SW1Y 4AD United Kingdom Rio Tinto Limited Level 7, 360 Collins Street Melbourne VIC 3000 Australia
Notification of dividend / distribution Notification of dividend / distribution 1 / 6 Announcement Summary Entity name RIO TINTO LIMITED Security on which the Distribution will be paid RIO - ORDINARY FULLY PAID Announcement Type New announcement Date of this announcement Wednesday February 17, 2021 Distribution Amount AUD 5.17110000 Ex Date Thursday March 4, 2021 Record Date Friday March 5, 2021 Payment Date Thursday April 15, 2021 DRP election date Tuesday March 23, 2021 17:00:00 Refer to below for full details of the announcement EXHIBIT 99.8
Notification of dividend / distribution Notification of dividend / distribution 2 / 6 Announcement Details Part 1 - Entity and announcement details 1.1 Name of +Entity RIO TINTO LIMITED 1.2 Registered Number Type ABN Registration Number 96004458404 1.3 ASX issuer code RIO 1.4 The announcement is 1.5 Date of this announcement Wednesday February 17, 2021 1.6 ASX +Security Code RIO ASX +Security Description ORDINARY FULLY PAID Part 2A - All dividends/distributions basic details 2A.1 Type of dividend/distribution 2A.2 The Dividend/distribution: relates to a period of six months 2A.3 The dividend/distribution relates to the financial reporting or payment period ending ended/ending (date) Thursday December 31, 2020 2A.4 +Record Date Friday March 5, 2021 Special Ordinary New announcement
Notification of dividend / distribution Notification of dividend / distribution 3 / 6 2A.5 Ex Date Thursday March 4, 2021 2A.6 Payment Date Thursday April 15, 2021 2A.7 Are any of the below approvals required for the dividend/distribution before business day 0 of the timetable? Security holder approval Court approval Lodgement of court order with +ASIC ACCC approval FIRB approval Another approval/condition external to the entity required before business day 0 of the timetable for the dividend/distribution. 2A.8 Currency in which the dividend/distribution is made ("primary currency") AUD - Australian Dollar 2A.9 Total dividend/distribution payment amount per +security (in primary currency) for all dividends/distributions notified in this form AUD 5.17110000 2A.10 Does the entity have arrangements relating to the currency in which the dividend/distribution is paid to securityholders that it wishes to disclose to the market? 2A.11 Does the entity have a securities plan for dividends/distributions on this +security? 2A.11a If the +entity has a DRP, is the DRP applicable to this dividend/distribution? 2A.11a(i) DRP Status in respect of this dividend/distribution Full DRP 2A.12 Does the +entity have tax component information apart from franking? Part 2B - Currency Information 2B.1 Does the entity default to payment in certain currencies dependent upon certain attributes such as the banking instruction or registered address of the +securityholder? (For example NZD to residents of New Zealand and/or USD to residents of the U.S.A.). Yes No Yes We have a Dividend/Distribution Reinvestment Plan (DRP) Yes No
Notification of dividend / distribution Notification of dividend / distribution 4 / 6 2B.2 Please provide a description of your currency arrangements All dividend payments will be made by direct credit. Where a security holder has nominated an Australian or United Kingdom financial institution account for receipt of payments, payment will be made by direct credit in AUD or GBP as applicable. Payments in GBP will be converted from AUD at the exchange rate applicable 5 business days prior to the dividend payment date and released to the ASX the following day. Computershare Investor Services Pty Ltd, Rio Tinto Limited's share registry offers a currency election facility (Global Wire Facility) in a range of currencies. Securityholders may elect to receive their dividend in a currency of their choice via the Global Wire Facility. Terms and conditions of the Global Wire Facility can be accessed at: auwww.investorcentre.com/ 2B.2a Other currency/currencies in which the dividend/distribution will be paid: Currency Payment currency equivalent amount per security GBP - Pound Sterling GBP 2B.2b Please provide the exchange rates used for non-primary currency payments 2B.2c If payment currency equivalent and exchange rates not known, date for information to be released Friday April 9, 2021 Estimated or Actual? 2B.3 Can the securityholder choose to receive a currency different to the currency they would receive under the default arrangements? Part 3A - Ordinary dividend/distribution 3A.1 Is the ordinary dividend/distribution estimated at this time? 3A.1a Ordinary dividend/distribution estimated amount per +security AUD 3A.1b Ordinary Dividend/distribution amount per security AUD 3.97480000 3A.2 Is the ordinary dividend/distribution franked? 3A.2a Is the ordinary dividend/distribution fully franked? 3A.3 Percentage of ordinary dividend/distribution that is franked 100.0000 % 3A.3a Applicable corporate tax rate for franking credit (%) 30.0000 % 3A.4 Ordinary dividend/distribution franked amount per +security AUD 3.97480000 3A.5 Percentage amount of dividend which is unfranked 0.0000 % YesYes No No Actual
Notification of dividend / distribution Notification of dividend / distribution 5 / 6 3A.6 Ordinary dividend/distribution unfranked amount per +security excluding conduit foreign income amount AUD 0.00000000 3A.7 Ordinary dividend/distribution conduit foreign income amount per security AUD 0.00000000 Part 3B - Special dividend/distribution 3B.1 Is the special dividend/distribution estimated at this time? 3B.1a Special dividend/distribution estimated amount per +security AUD 3B.1b Special dividend/distribution amount per +security AUD 1.19630000 3B.2 Is special dividend/distribution franked? 3B.2a Is the special dividend/distribution fully franked? 3B.3 Percentage of special dividend/distribution that is franked 100.0000 % 3B.3a Applicable corporate tax rate for franking credit (%) 30.0000 % 3B.4 Special dividend/distribution franked amount per +security AUD 1.19630000 3B.5 Percentage of special dividend/distribution that is unfranked 0.0000 % 3B.6 Special dividend/distribution unfranked amount per +security excluding conduit foreign income amount AUD 0.00000000 3B.7 Special dividend/distribution conduit foreign income amount per +security AUD 0.00000000 Part 4A - +Dividend reinvestment plan (DRP) 4A.1 What is the default option if +security holders do not indicate whether they want to participate in the DRP? 4A.2 Last date and time for lodgement of election notices to share registry under DRP Tuesday March 23, 2021 17:00:00 4A.3 DRP discount rate 0.0000 % 4A.4 Period of calculation of reinvestment price Start Date End Date Do not participate in DRP (i.e. cash payment) YesYes No
Notification of dividend / distribution Notification of dividend / distribution 6 / 6 4A.5 DRP price calculation methodology Shares will be purchased on-market on or as soon as practicable after the dividend payment date. It may be necessary to carry out several market transactions to acquire the number of shares required and the DRP price will be the average of the deal prices of those transactions. DRP price will be published at drpwww.riotinto.com/ -price 4A.6 DRP Price (including any discount): AUD 4A.7 DRP +securities +issue date 4A.8 Will DRP +securities be a new issue? 4A.9 Is there a minimum dollar amount or number of +securities required for DRP participation? 4A.10 Is there a maximum dollar amount or number of +securities required for DRP participation? 4A.11 Are there any other conditions applying to DRP participation? 4A.12 Link to a copy of the DRP plan rules under Rio Tinto Limited section.https://www.riotinto.com/invest/shareholder-information/dividends 4A.13 Further information about the DRP Part 5 - Further information 5.1 Please provide any further information applicable to this dividend/distribution 5.2 Additional information for inclusion in the Announcement Summary No No No No
Notice to ASX Page 1 of 17 Changes to Iron Ore Mineral Resources and Ore Reserves 17 February 2021 Rio Tinto today announces changes in Mineral Resources and Ore Reserves for Pilbara iron ore deposits in Western Australia. These changes will be included in Rio Tinto’s 2020 Annual Report, to be released to the market by 22 February 2021, and are reportable changes compared to the previous estimates in the 2019 Annual Report. The changes in Mineral Resources and Ore Reserves are required to be reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012 (JORC Code) and the ASX Listing Rules. Supporting information relating to the changes is set out in this release and its appendices. Mineral Resources and Ore Reserves are quoted in this release on a 100 per cent basis as dry product tonnes. Rio Tinto’s Mineral Resources and Ore Reserves as at 31 December 2020, and Rio Tinto’s interests, are set out in full in its 2020 Annual Report. Mineral Resources are reported in addition to Ore Reserves. Resource drilling campaigns from 2006 – 2019, and subsequent technical work, including a review of heritage sites in late 2020 have contributed to the changes in the following Mineral Resources and Ore Reserves, detailed in this release and its appendices: Table A - Material Changes to Mineral Resources and Ore Reserves 2020 Material changes to Mineral Resources and Ore Reserves Arrowhead / Rhodes Ridge Update to the Mineral Resources (all Inferred) for Arrowhead and Rhodes Ridge Main has increased Mineral Resources for the Rhodes Ridge JV by: • 76 Mt of Detrital Ore. • 202 Mt of Marra Mamba Ore. • 240 Mt of Brockman Process Ore. • 418 Mt of Brockman Ore. In addition there are other small net increases at other Rhodes Ridge JV deposits (Marra Mamba and Detrital). Poonda Initial declaration of a Mineral Resource (Inferred) for Poonda has increased Mineral Resources for Hamersley Iron by: • 532 Mt of Boolgeeda Formation ore. Western Range Drilling, in conjunction with a new geological model and updates to the Resource classification, pit designs, and certain heritage sites at the Western Range 36w-50w deposit have resulted in the following Mineral Resource and Ore Reserve changes for Hamersley Iron: • Overall Mineral Resource has increased by 13 Mt: o Measured Mineral Resource has decreased by 39 Mt. o Indicated Mineral Resource has increased by 8 Mt. o Inferred Mineral Resource has increased by 44 Mt. • Overall Ore Reserve has decreased by 42 Mt (note 1 Mt discrepancy below due to rounding): o Proven Ore Reserve has decreased by 65 Mt. o Probable Ore Reserve has increased by 24 Mt. EXHIBIT 99.9
Page 2 of 17 Changes in Rio Tinto’s Pilbara iron ore Mineral Resources and Ore Reserves between the end of 2019 and the end of 2020 are shown below in Table B and Table C respectively. Table B - Aggregate changes to Rio Tinto’s Pilbara iron ore Mineral Resource estimates between 31 Dec 2019 and 31 Dec 2020 (100% basis) Dry product (Mt) 2019 Mineral Resources 23,004 Arrowhead / Rhodes Ridge increases 938 Poonda increases 532 Net amount of other changes 310 2020 Mineral Resources 24,784 Table C - Aggregate changes to Rio Tinto’s Pilbara iron ore Ore Reserve estimates between 31 Dec 2019 and 31 Dec 2020 (100% basis) Dry product (Mt) 2019 Ore Reserves 3,332 Western Range decreases -42 Net amount of other changes (including depletion) -240 2020 Ore Reserves 3,050
The location of the deposits involved is shown in Figure 1. Figure 1 Deposit location map
Summary of information to support the Mineral Resource and Ore Reserve estimates Arrowhead & Rhodes Ridge Main Initial Mineral Resource estimates for the Arrowhead and Rhodes Ridge deposits are supported by the information set out in the Appendix to this release and located at riotinto.com/financial-news-performance/resources-and- reserves in accordance with the Table 1 checklist in the JORC Code. The following summary information is provided in accordance with rule 5.8 of the ASX Listing Rules. Geology, drilling techniques, and geological interpretation The Arrowhead and Rhodes Ridge Main deposits are located within the Hamersley Basin of Western Australia, the host to some of the most significant iron ore deposits in the world. Arrowhead mineralisation is primarily hosted by the Marra Mamba Iron Formation with additional detrital mineralisation present. Rhodes Ridge Main mineralisation is primarily hosted by the Brockman Iron Formation. At Arrowhead, multiple reverse circulation (RC) drilling and diamond drilling campaigns have been carried out since 1984, with the majority of drilling data obtained between 2007 and 2019. A total of 627 RC holes were completed for 58,235 m, and a total of 39 diamond holes were completed for 3,526 m. At Rhodes Ridge Main, multiple percussion, reverse circulation, and diamond drilling campaigns have been carried out since 1970, with the majority of drilling data obtained between 2010 and 2019. A total of 458 RC holes were completed for 48,735 m, and a total of 40 diamond holes were completed for 4,371 m. Only data from 2010 – 2019 was used for resource estimation. Pre-2010 data was used for geological interpretation only. Geophysical logging was completed for most drill holes employing a suite of down hole tools to obtain calliper, natural gamma and other data to assist in the interpretation of the stratigraphy. Geological modelling was performed by Rio Tinto Iron Ore geologists. The method involved interpretation of stratigraphy and mineralisation using surface geological mapping, lithological logging data, down-hole gamma data, and assay data. Sampling, sub-sampling method and sample analysis method For sampling since 2011, reverse circulation holes have been sub-sampled using rotary splitters. An ‘A’ and ‘B’ sub-sample, each representing 8% of the mass, were collected at 2 m intervals from the rotary cone splitter. Prior to 2011, reverse circulation samples were sub-sampled using a 3 or 4 tier riffle splitter. Diamond core was sampled as whole core. Samples were sent for analysis by independent assay laboratories. At the laboratory the sample was dried at 105 degrees Celsius for a minimum of 24 hours. The sample was then crushed to less than 3 mm using a crusher and rotary/linear splitting device to produce a 1 to 2.5 kg sub-sample. The sub-sample was pulverised to 95% of weight passing 150 µm. Fe, SiO2, Al2O3, P, Mn, MgO, TiO2, CaO and S were assayed using industry standard X-Ray Fluorescence (XRF) analysis. Loss on Ignition (LOI) was determined using an industry standard Thermo- Gravimetric Analyser (TGA). Estimation methodology Modelling was completed using the Rio Tinto Iron Ore Pilbara geological modelling and estimation standards. Inverse distance weighting to the second power method was used to estimate Fe, SiO2, Al2O3, P, Mn, LOI, LOI425, LOI650, S, TiO2, MgO, and CaO grades into parent cells for both deposits. The grade estimation process was completed using Maptek™ Vulcan™ software.
Criteria used for classification The Mineral Resource has been classified into the category of Inferred. The determination of the applicable category has considered the relevant factors (geology complexity, mineralisation continuity, sample spacing, data quality, and others as appropriate). The Arrowhead deposit data spacing is typically 400 m x 100 m to 400 m x 50 m. The Rhodes Ridge Main deposit data spacing is typically 400 m x 100 m. Cut-off grades At Arrowhead: • The cut-off for Marra Mamba and associated detrital Mineral Resources is greater than or equal to 58% Fe. At Rhodes Ridge: • The cut-off for Brockman Mineral Resources is greater than or equal to 60% Fe. • The cut-off for Brockman Process Ore Mineral Resources is material 50% ≤ Fe < 60% and 3% ≤ Al2O3 < 6%. Mining and metallurgical methods and parameters Development of this Mineral Resource assumes mining using standard Rio Tinto Iron Ore equipment and methods similar to other Rio Tinto Iron Ore operations. The assumed mining method is conventional truck and shovel open pit mining at an appropriate bench height. Mining practices will include grade control utilising blast hole data. It is assumed that standard crushing and screening processes used by Rio Tinto Iron Ore will be applicable for the processing of both Arrowhead and Rhodes Ridge. Rio Tinto plans to blend ore from Arrowhead and Rhodes Ridge with ore from other Rio Tinto Iron Ore mine sites to make a saleable ore product. Arrowhead and Rhodes Ridge ore will not be marketed directly. This plan is in line with current Rio Tinto Iron Ore practices where ore from multiple mines is combined to produce the Pilbara Blend product. No other significant modifying factors have yet been identified. The Arrowhead deposit is located within Temporary Reserve Tenure (TR70/04737, TR70/04192, TR70/04882, TR70/04883). The Rhodes Ridge deposit is located within Temporary Reserve Tenure (TR70/04267, TR70/04266, TR70/04737, TR70/04192).
Page 6 of 17 2020 Annual Report Mineral Resources table, showing line items relating to Arrowhead and Rhodes Ridge Likely Mining Measured resources Indicated resources Inferred resources Total resources 2020 compared with 2019 Method (a) at end 2020 at end 2020 at end 2020 Tonnage Grade Tonnage Grade Tonnage Grade Tonnage Grade Rio Tinto Interest % 2020 2019 2020 2019 millions millions millions millions millions IRON ORE (b) of tonnes %Fe of tonnes %Fe of tonnes %Fe of tonnes of tonnes %Fe %Fe Rhodes Ridge JV (Australia) (d) - Brockman (g) O/P 565 63.9 1,880 62.9 2,445 2,027 63.1 62.9 50.0 - Brockman Process Ore (h) O/P 176 57.6 724 56.8 900 660 56.9 56.8 50.0 - Marra Mamba (i) O/P 25 61.3 2,844 62.0 2,869 2,591 61.9 62.0 50.0 - Detrital (j) O/P 420 60.3 420 328 60.3 60.1 50.0 (a) Likely mining method: O/P = open pit; O/C = open cut; U/G = underground; D/O = dredging operation. (b) Iron ore Resources tonnes are reported on a dry weight basis. As Rio Tinto only markets blended iron ore products from multiple mine sources, a detailed breakdown of constituent elements by individual deposit is not reported. (d) The updated assessment of Mineral Resources reflects measures Rio Tinto has put in place following the events in the Juukan Gorge on 24 May 2020. These measures are intended to protect a number of sites, and to mitigate impacts to sites where there are existing heritage approvals authorising mining impacts, or a decision has been made not to seek regulatory approval to conduct mining activities, given the heritage considerations identified by Traditional Owners. The impact of the changes are not material to the total Resource. Rio Tinto’s approach to cultural heritage management generally will continue to evolve in response to changes in agreements with Traditional Owners, further engagement with Traditional Owners and changing heritage legislation. Any material changes to Mineral Resources as a result of the further refinement of Rio Tinto’s approach will be disclosed at the appropriate time. (g) Rhodes Ridge JV (Brockman) Resource tonnes have increased following an updated geological model at Rhodes Ridge. A JORC Table 1 in support of this change will be released to the market contemporaneously with the release of this Annual Report and can be viewed at riotinto.com/invest/financial-news-performance/resources-and-reserves. (h) Rhodes Ridge JV (Brockman Process Ore) Resources tonnes have increased following an updated geological model at Rhodes Ridge. A JORC Table 1 in support of this change will be released to the market contemporaneously with the release of this Annual Report and can be viewed at riotinto.com/invest/financial-news-performance/resources-and-reserves. (i) Rhodes Ridge JV (Marra Mamba) Resources tonnes have increased mainly due to an updated geological model at Arrowhead. A JORC Table 1 in support of this change will be released to the market contemporaneously with the release of this Annual Report and can be viewed at riotinto.com/invest/financial-news-performance/resources-and-reserves. (j) Rhodes Ridge JV (Brockman) (Detrital) Resource tonnes have increased mainly due to an updated geological model at Arrowhead.
Page 7 of 17 Poonda Initial Mineral Resource estimates for the Poonda deposit are supported by the information set out in the Appendix to this release and located at riotinto.com/financial-news-performance/resources-and-reserves in accordance with the Table 1 checklist in the JORC Code. The following summary information is provided in accordance with rule 5.8 of the ASX Listing Rules. Geology, drilling techniques, and geological interpretation The Poonda deposit is located within the Hamersley Basin of Western Australia, the host to some of the most significant iron ore deposits in the world. The deposit is located within Exploration Licenses E47/00580 and E47/00662. Poonda mineralisation is hosted by the Boolgeeda Iron Formation. At Poonda, multiple reverse circulation (RC) drilling and diamond drilling campaigns have been carried between 2006 and 2019. A total of 328 RC holes were completed for 36,536 m, and a total of 8 diamond holes were completed for 642.3 m. Geophysical logging was completed for most drill holes employing a suite of down-hole tools to obtain calliper, natural gamma and other data to assist in the interpretation of the stratigraphy. Geological modelling was performed by Rio Tinto Exploration (RTX) geologists. The method involved interpretation of stratigraphy and mineralisation using surface geological mapping, lithological logging data, down-hole gamma data, and assay data. Sampling, sub-sampling method and sample analysis method For sampling since 2011, reverse circulation holes have been sub-sampled using rotary splitters. An ‘A’ and ‘B’ sub-sample, each representing 8% of the mass, were collected at 2 m intervals from the rotary cone splitter. Prior to 2011, reverse circulation samples were sub-sampled using a 3 or 4 tier riffle splitter. Diamond core was sampled as whole core. Samples were then sent for analysis by independent assay laboratories. At the laboratory the sample was dried at 105 degrees Celsius for a minimum of 24 hours. The sample was then crushed to less than 3 mm using a boyd crusher and rotary/linear splitting device to produce a 1–2.5 kg sub-sample. The sub-sample was pulverised to 95% of weight passing 150 µm. Fe, SiO2, Al2O3, P, Mn, MgO, TiO2, CaO and S were assayed using industry standard X-Ray Fluorescence (XRF) analysis. Loss on Ignition (LOI) was determined using an industry standard Thermo-Gravimetric Analyser (TGA). Estimation methodology Modelling was completed using the Rio Tinto Iron Ore Pilbara geological modelling and estimation standards. Inverse distance weighting to the second power method was used to estimate Fe, SiO2, Al2O3, P, Mn, LOI, LOI425, LOI650, S, TiO2, MgO, and CaO grades into parent cells. The grade estimation process was completed using Maptek™ Vulcan™ software. Criteria used for classification The Mineral Resource has been classified into the category of Inferred. The determination of the applicable category has considered the relevant factors (geology complexity, mineralisation continuity, sample spacing, data quality, and others as appropriate). The Poonda deposit data spacing is typically 400 m x 100 m to 400 m x 50 m.
Cut-off grades The cut-off for Boolgeeda Ore Mineral Resources is material Fe ≥ 55% and Al2O3 ≤ 6.5%. Mining and metallurgical methods and parameters Development of this Mineral Resource assumes mining using standard Rio Tinto Iron Ore equipment and methods similar to other Rio Tinto Iron Ore operations. The assumed mining method is conventional truck and shovel open pit mining at an appropriate bench height. Mining practices will include grade control utilising blast hole data. It is assumed that standard crushing and screening processes used by Rio Tinto Iron Ore will be applicable for the processing of the Poonda deposit. It is further assumed that a concentrator will be applicable for the processing of Poonda ore by using gravity and heavy medium separation techniques. Predicted yield and upgrade are based on metallurgical test work conducted on representative samples collected from the Poonda deposit. Rio Tinto plans to sell Poonda Lump and Fines ore as a stand-alone saleable ore product. Poonda ore will be marketed directly. No other significant modifying factors have yet been identified.
Page 9 of 17 2020 Annual Report Mineral Resources table, showing line items relating to Poonda Likely Mining Measured resources Indicated resources Inferred resources Total resources 2020 compared with 2019 Method (a) at end 2020 at end 2020 at end 2020 Tonnage Grade Tonnage Grade Tonnage Grade Tonnage Grade Rio Tinto Interest % 2020 2019 2020 2019 millions millions millions millions millions IRON ORE (b) of tonnes %Fe of tonnes %Fe of tonnes %Fe of tonnes of tonnes %Fe %Fe Hamersley Iron (Australia) (d) - Boolgeeda (e) O/P 532 57.9 532 - 57.9 - 100.0 (a) Likely mining method: O/P = open pit; O/C = open cut; U/G = underground; D/O = dredging operation. (b) Iron ore Resources tonnes are reported on a dry weight basis. As Rio Tinto only markets blended iron ore products from multiple mine sources, a detailed breakdown of constituent elements by individual deposit is not reported. (d) The updated assessment of Mineral Resources reflects measures Rio Tinto has put in place following the events in the Juukan Gorge on 24 May 2020. These measures are intended to protect a number of sites, and to mitigate impacts to sites where there are existing heritage approvals authorising mining impacts, or a decision has been made not to seek regulatory approval to conduct mining activities, given the heritage considerations identified by Traditional Owners. The impact of the changes are not material to the total Resource. Rio Tinto’s approach to cultural heritage management generally will continue to evolve in response to changes in agreements with Traditional Owners, further engagement with Traditional Owners and changing heritage legislation. Any material changes to Mineral Resources as a result of the further refinement of Rio Tinto’s approach will be disclosed at the appropriate time. (e) Hamersley Iron (Australia) - Boolgeeda Resources are being reported for the first time with the addition of the Poonda deposit. A JORC Table 1 in support of this change will be released to the market contemporaneously with the release of this Annual Report and can be viewed at riotinto.com/invest/financial-news-performance/resources-and-reserves. .
Page 10 of 17 Western Range 36W-50W Initial Ore Reserve and Mineral Resource estimates for the Western Range 36W–50W deposit are supported by the information set out in the Appendix to this release and located at riotinto.com/financial-news- performance/resources-and-reserves in accordance with the Table 1 checklist in the JORC Code. The following summary information is provided in accordance with rules 5.8 and 5.9 of the ASX Listing Rules. Geology, drilling techniques, and geological interpretation: The Western Range 36W–50W deposit is located within the Hamersley Basin of Western Australia, the host to some of the most significant iron ore deposits in the world. The Western Range 36W–50W deposit mineralisation is primarily hosted by the Brockman Iron Formation with additional detrital mineralisation present. Percussion and reverse circulation (RC) drilling was carried out between 1968 and 2019. A total of 1170 holes were completed for 106,307.5 m. In addition to this, 102 diamond drill holes from various drilling campaigns from 2003 – 2019 are available for geological interpretation, geotechnical and metallurgical assessments. Geophysical logging was completed for the majority of the drill holes, employing a suite of down-hole tools to obtain calliper, gamma, and other data to assist in the interpretation of the stratigraphy. Geological modelling was performed by Rio Tinto Iron Ore geologists. The method involves interpretation of stratigraphy and mineralisation using surface geological mapping, lithological logging data, down-hole gamma data, and assay data. Sampling, sub-sampling method and sample analysis method Dry samples were collected at 2 m intervals (Reverse Circulation) and 1.5 m (Percussion). Sub-sampling at the rig was carried out utilising a riffle splitter (2002 and earlier) or a rotary cone splitter (2011-2019). The sample was then sent for analytical testing at Rio Tinto’s internal laboratory at Dampier (2002 and earlier) or Bureau Veritas Laboratories (formerly Ultratrace Laboratories) for the 2011-2013 drilling programs, and Intertek Genalysis from the 2017-2019 drill programs. The majority of the samples were oven dried at 105 degrees Celsius for a minimum of 24 hours. Samples were then crushed, split and pulverised to produce a 100-150 g sample of - 150 µm (2002 onwards). Fe, SiO2, Al2O3, P, Mn, MgO, TiO2, CaO and S were assayed using lithium tetraborate and metaborate fusion and X-Ray Fluorescence (XRF) analysis. Loss on Ignition (LOI) is determined using a Thermo-Gravimetric Analyser (TGA). Greater detail of this process for each of the drilling generations is outlined in the appendix. Estimation methodology Modelling was completed using the Rio Tinto Iron Ore Pilbara geological modelling and estimation standards. Ordinary kriging and inverse distance weighting to the first and second power methods were used to estimate Fe, SiO2, Al2O3, P, Mn, LOI, LOI425, LOI650, S, TiO2, MgO, and CaO grades into parent cells. The grade estimation process was completed using Maptek™ Vulcan™ software.
Criteria used for classification The Western Range 36W-50W Mineral Resource has seen some reclassification of Measured Resource into Indicated and Inferred from the previous resource model. By incorporating reconciliation findings from analogous mined deposits and having regard to the complex structure and mineralisation style of this deposit, the resource classification has been updated. The Mineral Resource for the Western Range 36W-50W deposit has been classified into the category of Measured, Indicated and Inferred. The determination of the applicable category has considered the relevant factors (geology complexity, mineralisation continuity, sample spacing, data quality, and other factors as appropriate): • Measured Resource is bedded mineralisation that demonstrates good or reasonable geological and grade continuity and is drilled at 30 m x 30 m spacing. • Indicated Resource is bedded mineralisation that has reasonable geological and grade continuity and is drilled at 120 m x 60 m spacing. • Inferred Resource is bedded mineralisation with drill spacing greater than 120 m x 60 m, or open mineralisation along domain margins and at depth with no drill support, or bedded mineralisation with limited continuity or limited drill support across strike, or Mature Detrital, or Hydrated mineralisation. The Ore Reserve is the economically mineable part of a Mineral Resource. Ore Reserves include modifying factors such as, for example, mining and processing recoveries. For this deposit, economically mineable Measured Mineral Resources convert to Proved Ore Reserves and the economically mineable Indicated Mineral Resources convert to Probable Ore Reserves. Economic assumptions Rio Tinto applies a common process to the generation of commodity prices across the group. This involves generation of long-term price curves based on current sales contracts, industry capacity analysis, global commodity consumption and economic growth trends. In this process, a price curve rather than a single price point is used to develop estimates of mine returns over the life of the project. The detail of this process and of the price point curves is commercially sensitive and is not disclosed. Mining and recovery factors The Mineral Resource model was regularised to a block size which was determined to be the selective mining unit following an analysis of a range of selective mining units. Dilution and mining recovery were modelled by applying the regularisation process to the sub-block geological model. Metallurgical models were applied to the regularised model in order to model product tonnage, grades and yields. Pit optimisation utilising the Lerchs-Grossmann algorithm was undertaken applying applicable cost, revenue and geotechnical inputs. The resultant pit shells were used to develop detailed pit designs with due consideration of geotechnical, geometric and access constraints. These pit designs were used as the basis for production scheduling and economic evaluation. Conventional mining methods (truck and shovel) similar to other Rio Tinto Iron Ore mines were selected. The geotechnical parameters have been applied based on geotechnical studies informed by technical assessments of diamond drill holes drilled during the 2012 to 2019 drilling programmes, specifically drilled for geotechnical purposes on the surrounding host rock.
Processing During drill campaigns from 2003-2019 a total of 3,382 m of metallurgical PQ diamond holes were drilled in the Western Range 36W–50W deposit. Data obtained from this core formed the basis for metallurgical test work which was utilised to develop metallurgical models representing different metallurgical domains which were considered representative of the ore body. The metallurgical models predict product tonnage and grade parameters for lump and fines products. The Western Range 36W–50W ore, if developed, would be processed through the Paraburdoo processing facility, which comprises a dry crushing and screening facility with desliming. This style of processing is well suited to the Brockman ore at the Western Range 36W–50W deposit. The proposed metallurgical process is a well-tested and proven processing methodology, having been utilised at Rio Tinto Iron Ore mining operations for decades. Rio Tinto plans to blend ore from Western Range 36W–50W with ore from other Rio Tinto Iron Ore mine sites to make a saleable ore product. If developed, Western Range 36W–50W ore, would not be marketed directly. This plan is in line with current Rio Tinto Iron Ore practices where ore from multiple mines is combined to produce the Pilbara Blend product. Cut-off grades For Mineral Resource reporting: • The cut-off for Brockman Mineral Resources is greater than or equal to 60% Fe. • The cut-off for Brockman Process Ore Mineral Resources is material 50% ≤ Fe < 60% and 3% ≤ Al2O3 < 6%. For Ore Reserves, the Western Range 36W–50W deposit is reported using variable cut-off grade (VCoG), in line with a number of other Pilbara deposits. Application of VCoG allows the varying of the head grade across the life of the deposit, to achieve desired product grades. At Western Range 36W–50W, this approximates to a cut-off of 58.5% Fe over the mine life. Modifying factors The Western Range 36W–50W deposit is located within existing Mining Lease AM70/00246 (ML246SA), which was granted pursuant to the Paraburdoo State Agreement. Access to the Western Range 36W–50W deposit will be via an access road from the existing Paraburdoo mine. If developed, a crusher and conveyor will be built at the Greater Western Range operations (incorporating the 27W, 36W-50W and 55W-66W deposits), linking to the existing Paraburdoo mine processing plant. The Paraburdoo mine product stockpiles, rail and train load-out system will be utilised and ore will be railed to Rio Tinto ports at Dampier and Cape Lambert. The existing port and railway networks will have sufficient capacity to accommodate ore supply from the Western Range 36W-50W deposit. Support facilities located at the Greater Western Range operations will include a fixed plant workshop, bulk fuel storage and refuelling facilities, and bulk lube storage. Existing support facilities at the Paraburdoo mine will be utilised, including heavy and light vehicle workshops, an explosive facility, and the waste fines storage facility. Electric power will be supplied via a 33kV connection to the Rio Tinto transmission network at Paraburdoo. Water will be sourced from bores at Western Range, supplemented by a connection to Paraburdoo borefields. Residential and Fly in, Fly out operations personnel will be accommodated in the Paraburdoo town, and utilise the Paraburdoo airport. Ethnographic and archaeological surveys of the area have been completed and are regularly reviewed and updated; all known sites have been located, recorded and considered during mine planning and engineering activities.
Groundwater abstraction and quality will continue to be managed in accordance with the existing Greater Paraburdoo Groundwater Licences and associated Groundwater Operating Strategy, and any amendments as required. The Western Range 36W–50W deposit is located within the Shire of Ashburton. Rio Tinto Iron Ore has established an ongoing engagement with the Shire of Ashburton, which includes scheduled meetings and project updates. The Greater Paraburdoo Iron Ore Hub (Proposal) was formally referred to the Environmental Protection Authority (EPA) under section 38 of the Environmental Protection Act 1986 (EP Act) on 5 November 2018. The Proposal was also referred to Department of the Agriculture, Water and Energy (DWAE). The delegate for the Commonwealth Minister for the Environment determined that the Proposal is a controlled action under s. 75 of the EPBC Act, requiring further assessment and approval. The EPA is assessing the Proposal as an accredited assessment on behalf of the Commonwealth under s. 87 of the EPBC Act. The Environmental Scoping Document (ESD) identified the following key environmental factors relevant to the Proposal: Flora and Vegetation; Terrestrial Fauna; Subterranean Fauna; Inland Waters and Social Surroundings. The ESD was approved by the EPA in June 2019. A Draft Environmental Review Document (ERD) was submitted to the EPA on 31 October 2019. The ERD provides assessment of the potential impacts of this Proposal on the key environmental factors to enable the EPA to determine the environmental acceptability of this Proposal. Following multiple reviews of the Draft ERD by regulators, the ERD was released for a two-week public review period from 13-27 May 2020. Rio Tinto is currently preparing responses to the submissions received during the public review period. For the Western Range 36W–50W, accuracy and confidence of modifying factors are generally consistent with the current level of study (Pre-Feasibility Study).
Page 14 of 17 2020 Annual Report Mineral Resources table, showing line items relating to Western Ranges 36W-50W Likely Mining Measured resources Indicated resources Inferred resources Total resources 2020 compared with 2019 Method (a) at end 2020 at end 2020 at end 2020 Tonnage Grade Tonnage Grade Tonnage Grade Tonnage Grade Rio Tinto Interest % 2020 2019 2020 2019 millions millions millions millions millions IRON ORE (b) of tonnes %Fe of tonnes %Fe of tonnes %Fe of tonnes of tonnes %Fe %Fe Hamersley Iron (Australia) (c) (d) - Brockman O/P 276 62.1 607 62.5 2,533 62.1 3,416 3,401 62.2 62.2 100.0 - Brockman Process Ore O/P 218 57.3 231 56.9 765 57.4 1,214 1,190 57.3 57.3 100.0 (a) Likely mining method: O/P = open pit; U/G = underground; D/O = dredging operation. (b) Iron Ore Resources are reported on a dry weight basis. As Rio Tinto only markets blended iron ore products from multiple mine sources, a detailed breakdown of constituent elements by individual deposit is not reported. (c) Channar Resource tonnes previously reported under Channar JV (Australia) are now reported under Hamersley Iron (Australia) Brockman and Brockman Process Ore following the completion of the joint venture arrangement. (d) The updated assessment of Mineral Resources reflects measures Rio Tinto has put in place following the events in the Juukan Gorge on 24 May 2020. These measures are intended to protect a number of sites, and to mitigate impacts to sites where there are existing heritage approvals authorising mining impacts, or a decision has been made not to seek regulatory approval to conduct mining activities, given the heritage considerations identified by Traditional Owners. The impact of the changes are not material to the total Resource. Rio Tinto’s approach to cultural heritage management generally will continue to evolve in response to changes in agreements with Traditional Owners, further engagement with Traditional Owners and changing heritage legislation. Any material changes to Mineral Resources as a result of the further refinement of Rio Tinto’s approach will be disclosed at the appropriate time.
2020 Annual Report Ore Reserves table, showing line items relating to Western Ranges 36W-50W Proved Ore Reserves Probable Ore Reserves Total Ore Reserves 2020 compared with 2019 at end 2020 at end 2020 Type of mine (a) Tonnage Grade Tonnage Grade Tonnage Grade Interest % Recoverable metal 2020 2019 2020 2019 Marketable product millions millions millions millions millions IRON ORE (b) (c) of tonnes %Fe of tonnes %Fe of tonnes of tonnes %Fe %Fe of tonnes Reserves at development projects Hamersley Iron (Australia) (d) - Western Range (Brockman ore) (n) O/P 106 62.2 53 62.0 159 201 62.2 62.5 100.0 159 (a) Type of mine: O/P = open pit, U/G = underground, D/O = dredging operation. (b) Reserves of bauxite, diamonds and iron ore are shown as recoverable Reserves of marketable product after accounting for all mining and processing losses. Mill recoveries are therefore not shown. (c) Australian iron ore Reserve tonnes are reported on a dry weight basis. As Rio Tinto only markets blended iron ore products from multiple mine sources, a detailed breakdown of constituent elements by individual deposit is not reported. (d) The updated assessment of Ore Reserves reflects measures Rio Tinto has put in place following the events in the Juukan Gorge on 24 May 2020. These measures are intended to protect a number of sites, and to mitigate impacts to sites where there are existing heritage approvals authorising mining impacts, or a decision has been made not to seek regulatory approval to conduct mining activities, given the heritage considerations identified by Traditional Owners. As a result, Rio Tinto has removed 54 Mt from reserves across Brockman 4, Western Range, Gudai-Darri, Greater Brockman 2 Nammuldi and West Angelas, including the 17 Mt at Western Range, which is the subject of a separate Table 1 report. Rio Tinto’s approach to cultural heritage management generally will continue to evolve in response to changes in agreements with Traditional Owners, further engagement with Traditional Owners and changing heritage legislation. Any material changes to Ore Reserves as a result of the further refinement of Rio Tinto’s approach will be disclosed at the appropriate time. (n) Western Range (Brockman ore) Reserve tonnes decreased following updates to the geological model and updated pit designs. A JORC Table 1 in support of this change will be released to the market contemporaneously with the release of this Annual Report and can be viewed at riotinto.com/invest/financial-news-performance/resources-and-reserves. Joint venture discussions with China Baowu Group covering the Western Range mining hub are continuing.
Page 16 of 17 Competent Persons’ statement The information in this report that relates to Mineral Resources is based on information compiled under the supervision of Mr Bruce Sommerville, who is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM). Mr Sommerville has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity to which he is undertaking to qualify as a Competent Person as defined in the JORC Code. Mr Sommerville is a full-time employee of Rio Tinto and consents to the inclusion in this report of the matters based on the information that he has prepared in the form and context in which it appears. The information in this report that relates to Ore Reserves is based on information compiled under the supervision of Mr Rishi Verma, who is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM). Mr Verma has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity to which he is undertaking to qualify as a Competent Person as defined in the JORC Code. Mr Verma is a full-time employee of Rio Tinto and consents to the inclusion in this report of the matters based on the information that he has prepared in the form and context in which it appears.
Page 17 of 17 Contacts media.enquiries@riotinto.com riotinto.com Follow @RioTinto on Twitter Media Relations, United Kingdom Illtud Harri M +44 7920 503 600 David Outhwaite T +44 20 7781 1623 M +44 7787 597 493 Media Relations, Americas Matthew Klar T +1 514 608 4429 Media Relations, Asia Grant Donald T +65 6679 9290 M +65 9722 6028 Media Relations, Australia Jonathan Rose T +61 3 9283 3088 M +61 447 028 913 Matt Chambers T +61 3 9283 3087 M +61 433 525 739 Jesse Riseborough T +61 8 6211 6013 M +61 436 653 412 Investor Relations, United Kingdom Menno Sanderse T: +44 20 7781 1517 M: +44 7825 195 178 David Ovington T +44 20 7781 2051 M +44 7920 010 978 Clare Peever M: +44 7788 967 877 Investor Relations, Australia Natalie Worley T +61 3 9283 3063 M +61 409 210 462 Amar Jambaa T +61 3 9283 3627 M +61 472 865 948 Group Company Secretary Steve Allen Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885 Joint Company Secretary Tim Paine Rio Tinto Limited Level 7, 360 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404 This announcement is authorised for release to the market by Rio Tinto’s Group Company Secretary.
Appendix 1 Rhodes Ridge Joint Venture: Arrowhead & Rhodes Ridge Main Deposits –Table 1 The following table provides a summary of important assessment and reporting criteria used at the Arrowhead and Rhodes Ridge Main deposits for the reporting of Mineral Resources and Ore Reserves, in accordance with the Table 1 checklist in The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition). Criteria in each section apply to all preceding and succeeding sections. General Statements apply to both Arrowhead and Rhodes Ridge Main, whereas deposit specific statements are noted separately. Section 1 Sampling Techniques and Data Criteria Commentary Sampling techniques General Statements: • Throughout the historic and modern drill programmes, samples were collected for geological logging, assay, metallurgical and density test work using percussion, reverse circulation (RC) and diamond drilling (DD) methods. The sampling techniques employed over the years vary over time and between different campaigns. • Geological logging and assay samples were collected at 2 m intervals from reverse circulation drilling and in 1.5 m to 3 m intervals for percussion drilling; all intervals were sampled. • Diamond core drilling uses double and triple-tube techniques and samples were taken at 1 m intervals. • Dry core density samples were collected via diamond core drilling of PQ-3 core. • Metallurgical core samples were collected via diamond core drilling of PQ-3 core. • The most recent reverse circulation drilling utilised a rotary cone splitter beneath a cyclone return system to obtain a primary and secondary sample, with attention on samples collected being of comparable weights. The splitter produced two 8% samples (‘A’ and ‘B’) and one 84% reject sample. Primary ‘A’ sample was collected at 2 m intervals through 8% blades from the outer cone of rotary cone splitter. • The presence of mineralisation was determined by a combination of geological logging and geochemical assay results. Deposit Specific Statements: • The Arrowhead deposit has seen multiple generations of drilling; 1980s (1984, 1985, 1986, 1987, 1988), 1990s (1990, 1991, 1992 and 1996), and recent drilling (2007, 2008, & 2019). • The Rhodes Ridge deposit has seen multiple generations of drilling; 1970s (1970 & 1971), 1980s (1985 & 1986), 1990s (1991 and 1999), and modern drilling (2010, 2011, 2016, 2017,2019). The sampling techniques at Arrowhead and Rhodes Ridge Main by programmes were as follows: • 1984, 1985, 1986, 1987, 1988, 1990, 1991 and 1992: samples were collected at regular 3 m interval except for: o The first sample of the hole, which was from 0 to 4 m, to reflect the starting drilling string composed of a 3 m starter rod together with a 1 m stabiliser. o The sample at the changeover from conventional to reverse circulation drilling which was a 2 m sample. • 1984, 1985, 1986, 1987 and 1988: o The dry samples were collected at 1.5 m intervals in a cyclone which was emptied into a steel tray and riffle split. One half was laid on the ground for geological logging, while the other half was kept in a steel tray. When the remaining 1.5 m of each sample interval was collected, one half was mixed with the half of the first 1.5 m sample kept in the steel tray. The combined sample was then riffled to provide two samples of approximately 1 kg each. The remaining half of the second 1.5 m sample was laid on the ground for geological logging. • 1991 and 1992: o A 3 m sampling interval was used for the percussion drilling. The dry samples were collected in a cyclone at 1.5 m half sample intervals and then discharged into an 87.5% / 12.5% riffle splitter. The 87.5% split was collected in a wheelbarrow and placed in ordered rows on the ground for geological logging while the 12.5% split was retained in a large plastic sample bag. Similarly, with the second 1.5 m half sample, the 12.5% split was added to the first 12.5% sample in the large plastic sample bag. The samples in
Appendix 1 2 the plastic bags (each represented 3 m) were then riffled down to provide two samples of approximately 5 kg each. A 1 to 2 kg samples was further riffled from one of 5 kg splits to provide a duplicate sample of each interval. • 1984 to 1992: o Wet samples obtained from percussion drilling during 1984 to 1992 programmes below water table entered a cyclone and were discharged partially into a 20 L bucket and partially into a wheelbarrow. The samples from the wheelbarrow were emptied on the ground for geological logging. The sample collected in the steel bucket was allowed to settle and supernatant water was siphoned off as much as possible without loss of any fines. The samples were then transported in buckets / drums to the camp where they were transferred to concrete trays and left to dry in the sun. Once dry, the samples were taken out of the trays and riffle split to produce two 1 kg samples for each sample interval. • 1996 and 1999: o Each reverse circulation hole was sampled in 2 m composites from a multi-level riffle splitter. Two samples were collected from each 2 m composite: One was the retention sample of 1 kg contained in a screw top plastic jar (honey pot) with a sample tag placed inside the container. The second sample of approximately 5 kg was collected in a calico bag and sent for chemical analysis. o Excess sample material which was collected beneath the riffle splitter in a wheelbarrow and placed in orderly separate piles lined up on a cleared pad adjacent to the drill site. The labelled retention sample was placed on top of each sample pile in order to facilitate matching the sample numbers with the interval. • 2007-2008: o Each reverse circulation hole was sampled in 2 m composites using a rotating cone splitter placed directly underneath the rig’s cyclone. The rotating cone inside the splitter spun at a nominal 20 rpm producing splits of 88% waste, a 6% laboratory sample and a 6% retention sample. o For wet drilling, hoses were placed over the openings to guide the wet samples into the two calico lined buckets for laboratory and retention samples. The remainder of the sample fell through the base of the splitter into a wheelbarrow placed directly below it. Samples were collected into calico bags that lined 20 L plastic buckets with holes in the base to allow water to drain from the calico bag. The samples were left in the buckets and allowed to drain and dry. Once dry, the samples were collected for analysis. For each sample interval, one split was collected for sample analysis and the second was stored as a duplicate for retention. • 2010 - 2019: o Each reverse circulation hole was sampled in 2 m composites utilising a rotary cone splitter with the split of 8% of Primary (‘A’ samples) and 8% Duplicate samples and 84% rejects. o Sample was collected in alpha-numerically numbered calico bags. o Due to the potential of fibrous mineral intersections, water injection was used throughout the programme. o ‘A’ split was always taken from the same respective chute of the splitter, keeping any possible biases constant. o Regular cleaning of the splitter and cyclone was undertaken to avoid smearing and contamination across intervals. o Respective ‘A’ splits were laid out in separate rows on the ground adjacent to bulk reject sample, avoiding mixing of bags. o In 2014 a ‘third sample chute’ was fitted to the splitter that collected a geologist sample in a 10 L bucket. The remaining sample was directed to a sump. o The retention samples (‘B’ splits) were collected and stored in a 200 L drum at site. As of January 2019, ‘B’ split was collected only for Field Duplicate analysis. Drilling techniques General Statements: • Percussion drilling from 1984 to 1988 programmes utilised a Schramm T685 with Sullair compressor rated at 850cfm/350 psi from Vaughan Burt Drilling Co. Ltd / Drillex, and a RCD100 with Atlas Copco compressor rated at 750 cfm/300 psi. The RCD100 was capable of conventional drilling only whereas the Schramm was set-up for both conventional hammer and face sampling (hollow) hammer. All holes were drilled vertically. Drilling above the water table was conducted
Appendix 1 3 by the conventional method using a down-hole hammer and below the water table by the reverse circulation method with either a down-hole hammer or rock roller bit assembly. • Percussion drilling from 1990 to 1992 programmes utilised a Schramm T685 from Drillex capable of delivering 850 cfm/350 psi with variable hole diameters depending on the technique employee at the time (refer to Table 1). Above water table (AWT) drilling was conducted using conventional drilling method using down-hole hammer and below water table (BWT) drilling was carried out by reverse circulation using both hammer and roller bits. Table 1 1990 to 1992 Drilling Techniques and Hole Diameters Technique 1990 1991 1992 Conventional Blade Not Used Not Used 158 mm Conventional Hammer 163 mm 140 mm 140-150 mm RC Face Hammer 163 mm 139 mm 140 mm RC Roller Bit 150 mm • Reverse circulation drilling during 1996 and 1999 programmes utilised 5.25-inch hammer and 4.5-inch drill rods. An auxiliary compressor plus a booster were used for holes deeper than 150 m. • Reverse circulation drilling during 2010-2019 programmes utilised a 140 mm diameter face sampling bit with a sample shroud, attached to a pneumatic piston hammer. This was used to penetrate the ground and deliver the sample up the 6 m drill rod inner tubes (4 m starter rod) through to the cyclone and the rotary cone splitter. • Wet drilling was introduced in late 2013. Pre-2013, predominantly dry drilling was employed. • The reverse circulation drilling programmes were mostly vertical with some angled holes drilled (-60 to -85 degrees north and south), where there was limited area for a drill pad or specific geotechnical requirements. • Diamond drilling was a combination of HQ and PQ core sizes (HQ-3 = 61.1 mm core diameter and PQ-3 = 83.0 mm core diameter) using double and triple tube techniques. • Core orientation data were collected where possible, predominantly within banded iron formation (BIF), hydrated zones or intervals of consolidated core. • The diamond drilling programmes were vertical to near vertical. Deposit Specific Statements: Arrowhead: • 1980s drill campaigns: percussion drilling. • 1990s drill campaigns: percussion (1990 to 1992) and reverse circulation (1996). • All drilling from 2007 onwards has been diamond and reverse circulation drilling. Rhodes Ridge Main: • 1970s drill campaigns: percussion and diamond drilling. • 1990s drill campaigns: percussion (1991) and reverse circulation (1999). • All drilling from 2010 onwards has been diamond and reverse circulation drilling. Drill sample recovery General Statements: • For reserve circulation samples, sample weights were recorded at laboratory as sample received and a qualitative estimate of sample loss per drilling interval was made at the rig. • Diamond core recovery was maximised via the use of triple-tube sampling and additive drilling muds. • Diamond core recovery was recorded using rock quality designation (RQD) measurements with all cavities and core loss recorded in the Rio Tinto Iron Ore acQuire™ database (RTIODB). Only 2 % for Arrowhead and 3% for Rhodes Ridge of the total diamond drilled meters recorded intervals of core loss greater than or equal to 0.1m. • Sample recovery in some friable mineralisation may be reduced however, thorough analysis of duplicate sample performance does not indicate any chemical bias as a result of inequalities in sample recovery.
Appendix 1 4 Logging General Statements: • All drill holes were geologically logged utilising standard Rio Tinto Iron Ore Material Type Classification Scheme (RTIO MTCS) logging codes and entered into the Rio Tinto Iron Ore acQuire™ database (RTIODB) on field Toughbook laptops. Pre-2004, this was performed using pre-formatted paper logging sheets and transferred manually to the RTIODB. • Internal training and validation of logging included RTIO MTCS identification and calibration workshops, peer reviews and validation of logging versus assay results. • Geological logging was performed on 2 m intervals for all reverse circulation drilling and 1.5 m to 3m intervals for percussion drilling. • All diamond drill core was logged at either 1 m or 2 m intervals, depending on the level of detail required, and photographed digitally with the files stored on the Rio Tinto network. • Post 2010, reverse circulation chip piles were also photographed digitally, and files stored on Rio Tinto network servers. • Magnetic susceptibility readings were taken using a Kappameter for each interval. • Since 2001, drill holes were geophysically logged using down-hole geophysical tools to record gamma trace, calliper, density, resistivity, magnetic susceptibility and magnetic deviation. Deposit Specific Statements: Arrowhead: • 2019: open-hole acoustic and optical televiewer image data was collected in specific reverse circulation holes throughout the deposit for structural analyses. Rhodes Ridge Main: • 2016, 2017, 2019: open-hole acoustic and optical televiewer image data was collected in specific reverse circulation holes throughout the deposit for structural analyses. Sub-sampling techniques and sample preparation General Statements: Sub-sampling techniques: • Diamond core was sampled as whole core. • 2010 to 2019: o Wet reverse circulation drilling was sampled at 2 m intervals. Sub-sampling was carried out using a rotary cone splitter beneath a cyclone return system, producing approximate mass splits of: ‘A’ split – Analytical sample – 8% ‘B’ split – Retention sample – 8%; all retention samples were placed in green plastic bags and stored in labelled 220 L steel drums. Bulk Reject – 84%. • 1996 to 1999: o Dry reverse circulation drilling was samples at 2 m intervals. o Two samples were collected from each 2 m intervals via a multi-level riffle splitter. o One was the retention sample of 1 kg contained in a screw top plastic jar with a sample tag placed inside the container. o The second sample of approximately 5 kg was collected in a calico bag and sent for chemical analysis. • 1984 to 1992: o A 3 m sampling interval was used for the historical percussion drilling. o The dry 3 m samples in plastic bags were riffle split down to provide two samples of approximately 1 kg each for laboratory analysis. o The wet 3 m sample collected in the bucket was allowed to settle and as much supernatant water decanted as possible without further loss of any fines. Samples were then transported in buckets to the camp where they were transferred to concrete troughs lined with black plastic and left to dry in the sun. Once dry, the sample were riffled to collect two samples of approximately 1 kg each from each sample interval. It is important to note that in some cases lighter material was lost when the bucket overflowed. This will have introduced a small bias (increase Fe and decrease Al2O3) to the below water table grades. o A 1 kg duplicate sample of each drilled interval duly labelled with its hole number, depth and sample number was stored in the Sample Shed at Rhodes Ridge camp. o The remaining 1 kg duplicate was: o If mineralised, the sample was labelled with sample number only and dispatch for assay.
Appendix 1 5 o If waste, the sample was mixed to form a composite of like-lithology up to a maximum 9 m (ie 3 samples), and then riffled to produce a 1 kg sample that was dispatched for assay. Sample preparation of the ‘A’ split sample: • 2010 to 2019: o Samples were dried at 105 °C. o Samples were crushed to -3 mm using a Boyd Crusher and split using a rotary sample divider to capture 1 – 2.5 kg samples. o A robotic and manual LM5 was used to pulverise the total sample (1 to 2.5 kg) to 90% of the weight passing through a 150 micron (μm) sieve. o A 100 g sub-sample was collected for analysis. o Diamond drill core samples were crushed to -6 mm particle size (whole core sample) and followed the reverse circulation sample preparation procedure. • 1984 to 1999: o Each second sample of approximately 5 kg was crushed to <3 mm then passed through a Jones riffle splitter and reduced to a 200 g sample. The reduced sample was dried at 105 °C for three hours, then crushed in a Siebtechnik disk mill to minus 155 μm. A 0.4 g aliquot of the Siebtechnik milling was taken and made into a fused borate glass bead. The Competent Person considers that the sampling is representative of the in-situ material and that the procedures and sample sizes are appropriate for the style of mineralisation. Quality control samples, including duplicate samples were taken to check representivity as outlined below. Quality of assay data and laboratory tests General Statements: Assay methods: • All assaying of samples used in the Mineral Resource estimates have been performed by independent National Association of Testing Authorities (NATA) certified laboratories. • 2016 to 2019 (Arrowhead and Rhodes Ridge Main): o Fe, SiO2, Al2O3, TiO2, Mn, CaO, P, S, MgO, K2O, Zn, Pb, Cu, Ba, V, Cr, Cl, As, Ni, Co, Sn, Sr, Zr and Na were assayed using industry standard lithium tetraborate and lithium metaborate fusion and X-Ray Fluorescence (XRF) analytical techniques. o Loss on Ignition (LOI) was determined using an industry standard Thermo-Gravimetric Analyser (TGA) and was measured at three steps of temperatures: 140 - 425 °C, 425 - 650 °C, 650 - 1000 °C. Total LOI was also reported. o Samples were dispatched to Perth for preparation and analytical testing at Intertek- Genalysis Laboratory. • 2007 to 2010 (Arrowhead and Rhodes Ridge Main): o Fe, SiO2, Al2O3, TiO2, Mn, CaO, P, S, MgO, K2O, Zn, Pb, Cu, Ba, V, Cr, Cl, As, Ni, Co, Sn, Sr, Zr and Na were assayed using industry standard lithium tetraborate and lithium metaborate fusion and XRF analytical techniques. o LOI was measured using a TGA at a single temperature (1000C) in 2007. During the 2008 drilling programme, LOI was analysed using a TGA at three step temperatures (140° - 425 °C, 425 - 650 °C, 650 - 1000 °C) and presented as a weight percentage lost between temperatures. o Samples were dispatched to Perth for preparation and analytical testing at Ultratrace Laboratories. • 1992 to 1999 (Arrowhead and Rhodes Ridge Main): o The glass bead was analysed using a Philips 1600 XRF machine for the following constituents: Fe, SiO2, Al2O3, TiO2, P, Mn, CaO, MgO and S. o LOI determinations were performed on a 1 g subsample split from the millings which were heated to 900 °C for 35 minutes. o Samples were dispatched to Dampier for preparation and analytical testing at Hamersley Iron Pty Limited Laboratories. • 1987 to 1992 (Arrowhead and Rhodes Ridge Main): o Samples were analysed by XRF for the following constituents: Fe, SiO2, Al2O3, TiO2, P, Mn, CaO, MgO and S. o LOI was determined using Classical Chemical Method at 900 °C. o Repeat analyses of 1 in 10 samples was completed for quality control. In addition, Fe was also determined for these repeats by titration.
Appendix 1 6 o Samples were dispatched to Dampier for preparation and analytical testing at Hamersley Iron Pty Limited Laboratories and at Australian Assay Laboratories (1987 to 1990). • 1985 - 1986 (Arrowhead and Rhodes Ridge Main): o Samples were analysed by XRF for the following constituents: SiO2, Al2O3, P, TiO2, Mn, CaO, MgO and S. Fe was analysed by Precise Titration method and LOI was determined at 900 °C using the Classical Chemical Method. o Repeat analysis of 1 in 10 samples was completed for quality control. In addition, Fe was also determined for these repeats by titration. o Samples were dispatched to Perth for preparation and analytical testing at Australian Assay laboratories • Pre 1984 - 1984 (Arrowhead and Rhodes Ridge Main): o Samples were analysed by Inductively Coupled Plasma Emission Spectroscopy (ICP-ES) for the following constituents SiO2, Al2O3, TiO2, Mn, CaO and MgO. S and P assay values were determined using Leco Furnace Analysis and Colourimetry analysis respectively. Fe was analysed by Precise Titration and LOI was determined using Classical Chemical method analysis. o Samples were dispatched to Pilbara Laboratories, Dampier. Quality assurance measures: • Insertion of coarse reference standards by Rio Tinto Iron Ore geologists at a rate of one in every 30 samples in mineralised zones and one in every 60 samples in waste zones with a minimum of one standard per drill hole. Reference material was prepared and certified by Rio Tinto Iron Ore following ISO 3082:2009 (Iron Ores – Sampling and sample preparation procedures) and ISO 9516-1:2003 (Iron Ores – Determination of various elements by X-ray fluorescence spectrometry – Part 1: Comprehensive procedure). • Coarse reference standards contained a trace of strontium carbonate that was added at the time of preparation for ease of identification. • Reverse circulation field duplicates were collected by using a ‘B’ split retention sample, which was taken directly from the rig splitter. Duplicate insertion occurred at a frequency of one in 20. Trace zinc was included in the duplicate sample for identification. • At a frequency of one in 20, -3 mm splits and pulps were collected as laboratory splits and repeats respectively. These sub-samples were analysed at the same time as the original sample to assess sampling precision. • Internal laboratory quality assurance and quality control measures involved the use of internal laboratory standards of certified reference material in the form of pulps; blanks and duplicates were also inserted in each batch. • Random re-submission of pulps at an external laboratory was performed following analysis. • Chemical Analysis Testing (CAT) and Analytical Precision Testing (APT) samples were collected at a frequency of one per batch. They were submitted to a third-party laboratory (Geostats Pty Ltd) to check analytical precision and accuracy, as part of the Rio Tinto Iron Ore’s quality assurance and quality control (RTIO QA/QC) procedures. • Analysis of the performance of certified standard and field duplicates has indicated an acceptable level of accuracy and precision with no significant bias or contamination. Verification of sampling and assaying General Statements: • Field data was logged directly onto field Toughbook laptops using pre-formatted and validated logging templates, with details uploaded to the Rio Tinto Iron Ore database (RTIODB) on a daily basis. Pre- 2004, this was performed using pre-formatted paper logging sheets and transferred manually to the RTIODB. • The assaying of post-2002 samples used in the Mineral Resource estimates were performed by independent National Association of Testing Authorities (NATA) certified laboratories. Samples from 2002 and earlier were assayed at Dampier which carried an ISO 9001 accreditation. • Assay data was returned electronically from the laboratory and uploaded into the RTIODB. • Assay data was only accepted into the RTIODB once the quality control assessment was completed via Batch Analysis Tool. • Written procedures outline the processes of geological logging and data importing, quality assurance and quality control validation and assay importing. A robust, restricted-access database was in place to ensure that any requests to modify existing data go through appropriate channels and approvals, and that changes are tracked by date, time, and user. • Comparison of close space drilling between 2019 reverse circulation and historic percussion drill hole data shows that the drilling methods have similar grade distributions verifying the suitability of samples from percussion drilling being included in the Mineral Resource estimate.
Appendix 1 7 Location of data points General Statements: • Drill hole collars from the 2007 to 2019 campaigns were surveyed by qualified RTIO surveyors using Differential Global Positioning System (DGPS) survey equipment (accurate to 10 cm in lateral and vertical directions) using the Geocentric Datum of Australia 1994 (GDA94) grid system. • Collar location data was validated by checking actual versus planned coordinate discrepancies. Once validated, the survey data was uploaded into the drill hole database. • Drill hole collars from the pre-2007 campaigns were surveyed but the methods used were unknown and not well documented from this time. The X (easting) and Y (northing) coordinates of these drill holes were checked in plan view to look for deviations from the planned drill hole locations. If the drill hole locations made sense in plan view then the surveyed collar coordinates were assumed to be acceptable for modelling purposes. • The topographic surface was created from Light Detecting and Ranging (LiDAR) data (points spaced 5 m apart) captured in 2018. • All drill holes from 1984 to 2019 had the surveyed reduced level (RL) compared against a 5 m resolution topographic surface derived from Light Detecting and Ranging (LiDAR) data captured in 2018. Any holes with significant differences in RL (>1 m) from topographic surface were investigated and actioned accordingly. If the deviation in RL could not be explained or accounted for, the hole was considered high risk and excluded from the dataset. • Down-hole surveys were conducted on nearly every hole, with the exception of collapsed or otherwise hazardous holes; any significant, unexpected deviations were investigated and validated. Holes greater than 100 m depth were generally surveyed with an in-rod gyro tool. Data spacing and distribution General Statements: • Variability in drill spacing across parts of the deposit is due to exclusion areas restricting access. • Density and metallurgical drilling were variably spaced across the deposits, targeting specific stratigraphic units and material types. • The data spacing and distribution is deemed sufficient by the Competent Person to establish geological and grade continuity appropriate for the Mineral Resource classification that has been applied. • Sample compositing has not been performed as samples were collected almost exclusively at 2 m intervals (93% for Arrowhead and 100% for Rhodes Ridge). Deposit Specific Statements: Arrowhead: • The reverse circulation drill programmes were conducted on an east to west (E-W) grid pattern, at a mostly 400 m x 100 m collar spacing and locally 400 m x 50 m. Rhodes Ridge Main: • The reverse circulation drill programmes were conducted on an east to west (E-W) grid pattern, at a mostly 400 m x 100 m collar spacing. Orientation of data in relation to geological structure General Statements: • Both the Arrowhead and Rhodes Ridge Main deposits trend roughly east- west, and the drill lines were roughly north-south oriented, which is perpendicular to the ore body. • Drilling was predominantly 85 degrees to vertical which is appropriate for the sub-horizontal to inclined stratigraphy. • While mineralisation was frequently intersected at an angle, the orientation of mineralisation relevant to drilling was not considered likely to have introduced any material bias. Sample security General Statements: • The sample chain of custody was managed by Rio Tinto Iron Ore Ltd. • Analytical samples (‘A’ splits) were collected by field assistants, placed into bulk bags and delivered to Perth by recognised freight service and then to the assay laboratory by a Perth-based courier service. Whilst in storage the samples were kept in a locked yard. • Pre 2019 retention samples (‘B’ splits) were collected and stored in drums at on-site facilities. In 2019 retention samples in a form of ‘B’ splits were not collected, with a 500 g coarse crushed split of 3 mm particle size stored at laboratory instead for 24 months. • 150 g of excess pulps from primary samples are retained indefinitely at laboratories and external storage facilities at CTI Logistics Ltd in Perth, Western Australia.
Appendix 1 8 Audits or reviews General Statements: • Whilst no external audits have been performed specifically on Arrowhead and Rhodes Ridge sampling techniques or data, external audits for sites (using the same techniques) have been completed and found the methods and procedures to be satisfactory. • Internal Rio Tinto Iron Ore peer review processes and internal Rio Tinto technical reviews were completed. These reviews concluded that the fundamental data collection techniques were appropriate. Section 2 Reporting of Exploration Results Criteria Commentary Mineral tenement and land tenure status General Statements: • The Arrowhead and Rhodes Ridge deposits form part of the Rhodes Ridge Joint Venture (RRJV) between Hamersley Resources Limited and Wright Prospecting Pty Ltd. Deposit Specific Statements: Arrowhead: • The Arrowhead deposit is contained wholly within Temporary Reserve Tenure (TR70/04737, TR70/04192 TR70/04882, TR70/04883) which is managed by Hamersley Resources Limited on behalf of the Rhodes Ridge Joint Venture. • Regarding any future effort to obtain a licence to operate, further studies, approvals and stakeholder engagement will be an important part of any development and these will be undertaken as required. Rhodes Ridge Main: • The Rhodes Ridge Main deposit is contained wholly within Temporary Reserve Tenure (TR70/04267, TR70/04266, TR70/04737, and TR70/04192) which is managed by Hamersley Resources Limited on behalf of the Rhodes Ridge Joint Venture. • Regarding any future effort to obtain a licence to operate, further studies, approvals and stakeholder engagement will be an important part of any development and these will be undertaken as required. Exploration done by other parties • Pre-1981 exploration work was completed by Texas Gulf Inc. on behalf of the Joint Venture at the time. • Post-1981 exploration work was carried out by Hamersley Resources Limited on behalf of the RRJV. • All data is currently available within Rio Tinto databases and most of this data has been used for the Mineral Resource estimate. Geology Arrowhead: • The Arrowhead deposit is hosted within the Marra Mamba Iron Formation of the Hamersley Group stratigraphy. • Three faults have been interpreted from a 2019 mapping programme and one additional fault was identified through drill hole interpretation during the geological modelling process. • The faults are sub-vertical to steeply dipping to the south. These faults are currently thought to originate as low-angle normal faults that formed during post-Opthalmia D2 crustal relaxation. These post D2 faults were subsequently re-activated and rotated during the Panhandle (D3) orogenic event. • The bedded mineralisation occurs primarily with the Mount Newman Member with minor mineralisation within the West Angelas Member, MacLeod Member and Nammuldi Member. • Mineralisation is generally capped by a hydrated zone which is overlain by a variable thickness zone of detrital material (red ochre detritals (oldest), limonite, clay-calcrete and immature detritals (youngest). Rhodes Ridge Main: • The Rhodes Ridge Main deposit is hosted within the Brockman Iron Formation of the Hamersley Group stratigraphy. • The deposit is situated locally within a large, broad, tightly folded syncline. • The bedded mineralisation occurs primarily with the Dales Gorge member with minor mineralisation within the Joffre and Whaleback units. • Mineralisation is generally capped by a thick hydrated zone (up to 40 m) which is overlain by a
Appendix 1 9 Criteria Commentary variable thickness zone of Hamersley surface detrital material. Drill hole Information Summary of drilling data used for the Geological Models and Mineral Resource estimates. Arrowhead: Year Diamond Reverse Circulation Percussion # Holes Meters # Holes Meters # Holes Meters 1984 - - - - 17 1,308 1985 - - - - 22 2,321 1986 - - - - 2 98 1987 - - - - 30 3,087 1988 - - - - 10 853 1990 - - - - 4 471 1991 - - - - 3 339 1992 - - - - 9 917 1996 - - 2 264 - - 2007 2 173 27 3,469 - - 2008 6 1,049 305 29,261 - - 2019 31 2,304 293 25,241 - - Total 39 3,526 627 58,235 97 9,394 Rhodes Ridge Main: Year Diamond Reverse Circulation Percussion # Holes Meters # Holes Meters # Holes Meters 1970 18 2,524 - - 301 19,690 1971 - - - - 66 2,960 1985 - - - - 1 46 1986 - - - - 6 448 1991 - - - - 7 1,099 1999 - - 7 544 - - 2010 - - 35 2,828 - - 2011 - - 13 1,030 - - 2016 - - 101 10,282 - - 2017 - - 146 15,062 - - 2019 22 1,847 156 18,989 - - Total 40 4,371 458 48,735 381 24,243 • Only data from 2010 to 2019 was used for grade estimation at Rhodes Ridge. Pre-2010 data was used for geological interpretation only. Data aggregation methods General Statements: • Not relevant as exploration results are not being reported. Relationship between mineralisation widths and intercept lengths General Statements: • Geometry of the mineralisation with respect to the drill hole angle was well-defined in most areas of the deposit. Drilling is predominantly vertical which is appropriate for the sub-horizontal to inclined stratigraphy of the majority of the deposit; and hence intercept lengths are approximately equivalent to true width of mineralisation.
Appendix 1 10 Criteria Commentary Diagrams Figure 1 Arrowhead deposit location map Figure 2 Arrowhead drill hole location map
Appendix 1 11 Figure 3 Arrowhead cross section 739950 mE Figure 4 Rhodes Ridge Main deposit location map
Appendix 1 12 Figure 5 Rhodes Ridge Main drill hole location map Figure 6 Rhodes Ridge Main deposit cross section 744850 mE
Appendix 1 13 Criteria Commentary Figure 7 Rhodes Ridge Main deposit cross section 746000 mE Balanced reporting • Not applicable, as Rio Tinto has not specifically released Exploration Results for this deposit. Other substantive exploration data Deposit Specific Statements: Arrowhead: • Detailed geological surface mapping was collected across the Arrowhead deposit in 2019 at 1:5,000 scale (Duncan et al., 2019). This replaced the previous 1985 geological mapping programme. • District scale gravity ground gravity survey was carried out over the Rhodes Ridge Arrowhead area in 2019. The data acquired from this survey was processed to produce the standard suite of 1VD, Residual and TDR images to aid in future exploration activities in the Rhodes Ridge JV area. Rhodes Ridge Main: • Detailed geological surface mapping was collected across the Rhodes Ridge deposit in 1994 at 1:10,000 scale (Goddard et al., 1994). Further work General Statements: • Further work at Arrowhead and Rhodes Ridge Main is planned to better define the orebody and improve structural understanding. Additional staged in-fill reverse circulation drilling, tests for lateral extensions and large-scale step-out drilling are required across the deposit. • Further diamond drilling for metallurgical, density, and geotechnical information is also required across the deposits. • Heritage and environmental surveys, and associated consultation will be undertaken in the future as required.
Appendix 1 14 Section 3 Estimation and Reporting of Mineral Resources Criteria Commentary Database integrity General Statements: • All drilling data is securely stored in the Rio Tinto Iron Ore acQuire™ database (RTIODB), managed by dedicated personnel within Rio Tinto Iron Ore. The system is backed up nightly on servers located in Perth, Western Australia. The backup system was tested in Sept 2020, demonstrating that the system is effective. • The import/exporting process requires limited keyboard transcription and has multiple built in safeguards to ensure information is not overwritten or deleted, these include: o The data is imported and exported through automated interfaces, with limited manual input; o Inbuilt validation checks ensure errors are identified prior to import; o Once within the RTIODB, editing is very limited and warning messages ensure accidental changes are not made; o Audit trail records updates and deletions should an anomaly be identified; o Export interface ensures the correct tables, fields and format are selected. • The drill hole database used for Mineral Resource estimation has been internally validated. Methods include checking: o acQuire™ scripts for relational integrity, duplicates, total assay and missing/blank assay values; o Grade ranges in each domain; o Domain names; o Survey data down-hole consistency; o Null and negative grade values; o Missing or overlapping intervals; o Duplicate data. • Drill hole data was also validated visually by domain and compared to the geological model. Site visits • The Competent Person visited both the Arrowhead and Rhodes Ridge deposits in 2020. No follow up was required as a result of this visit, and there has been no material changes at site since this time. Geological interpretation General Statements: • Overall, the Competent Person’s confidence in the geological interpretation of the area is good, based on the quantity and quality of data available, and the continuity and nature of the mineralisation. • Geological modelling was performed by Rio Tinto Iron Ore geologists. The method involves interpretation of stratigraphy using surface geological mapping, lithological logging data, down-hole gamma data, and assay data. • Cross-sectional interpretation of each stratigraphic unit was performed followed by interpretation of mineralisation and hydration boundaries based on mapping, and drilling data. Three-dimensional wireframes of the sectional interpretations are created to produce the geological model. • The geological model was subdivided into domains defined by stratigraphy and mineralisation and both the composites and model blocks are coded with these domains. Blocks in domains are estimated using composites from the same domain. • Mineralisation is continuous. It is affected by stratigraphy, structure and weathering. The drill hole spacing is sufficient to capture density, grade and geology variation for Mineral Resource reporting. Dimensions Deposit Specific Statements: Arrowhead: • Mineralisation extends approximately 18.5 km in the east-west Direction and approximately 8 km north-south at its widest point in the western part of the deposit. Mineralisation extends to depths greater than 280 m beneath the surface in some areas of the deposit. Rhodes Ridge Main: • Mineralisation extends approximately 16 km in the east-west direction and approximately 1.8 km north-south. Mineralisation extends to depths of greater than 200 m from surface in some areas of the deposit.
Appendix 1 15 Estimation and modelling techniques General Statements: • Twelve grade attributes (Fe, SiO2, Al2O3, P, Mn, LOI, LOI425, LOI650, S, TiO2, MgO, and CaO), and density were estimated into the block model. • Estimates were completed into parent blocks (block size of 100 m (X) × 25 m (Y) × 5 m (Z)). • Parent blocks were sub-celled to the geological boundaries to preserve volume. • Mineralised domains were estimated by inverse distance to the power of two (ID2) with a small number of blocks (<10%) being assigned average grades via scripting. Non- mineralised domains were estimated by inverse distance weighting to the first power (ID1) with some blocks (40%) assigned average grades in minor domains via scripting where sufficient data was not available. These methods were deemed appropriate by the Competent Person for estimating the tonnes and grade of the reported Mineral Resources. • The grade estimation process was completed using Maptek™ Vulcan™ software. • Grades were extrapolated to a maximum distance of approximately 400 m from data points. • Statistical analysis was carried out on data for all domains. • The estimated model was validated using a combination of visual and statistical methods that showed that the estimate was reasonable. • No production data is available for reconciliation. Deposit Specific Statements: Arrowhead: • High yield limits were placed on some minor variables (CaO, MgO, Mn) to limit the influence of outlier sample data as deemed appropriate for the dataset. Moisture General Statements: • All Mineral Resource tonnages are estimated and reported on a dry basis. Cut-off parameters General Statements: • The cut-off for reporting of Marra Mamba Mineral Resources and associated detrital Mineral Resource is material greater than or equal to 58% Fe. • The cut-off for reporting of Brockman Mineral Resources is greater than or equal to 60% Fe*. • The cut-off for reporting of Brockman Process Ore Mineral Resources is material 50% ≤ Fe < 60% and 3% ≤ Al2O3 < 6%*. *geology domain must be Dales Gorge, Joffre or Footwall Zone for inclusion in the Mineral Resource. Mining factors or assumptions General Statements: • Development of these Mineral Resources assumes mining using standard Rio Tinto Iron Ore equipment and methods similar to other Rio Tinto Iron Ore operations. The assumed mining method is conventional truck and shovel, open pit mining at an appropriate bench height. Mining practices will include grade control utilising blast hole data. • Rio Tinto Iron Ore plans to blend ore from the Arrowhead and Rhodes Ridge deposits with ore from other Rio Tinto Iron Ore mine sites to make a saleable ore product. This plan is in line with current Rio Tinto Iron Ore practices where ore from multiple mines is combined to produce the Pilbara Blend product. Metallurgical factors or assumptions General Statements: • Standard crushing and screening processes used by Rio Tinto Iron Ore are assumed applicable for processing of both the Arrowhead and Rhodes Ridge deposit. Environmental factors or assumptions General Statements: • Rio Tinto Iron Ore has an extensive environmental approval process. A review of requirements for approvals will be undertaken as part of future studies. • Mapping of oxidised shales, black carbonaceous shales, lignite, and the location of the water table, is used in prediction and planning for the treatment of potential environmental impacts. This process is in accordance with Rio Tinto’s Chemically Reactive Mineral Waste Standard. Bulk density General Statements:
Appendix 1 16 • Dry bulk density was derived from gamma-density data collected at 10 cm intervals from down- hole geophysical sondes. Accepted gamma-density data was corrected for moisture using Diamond drill core specifically drilled throughout the deposit. • Dry core densities were generated via the following process: o The core volume was measured in the split and the mass of the core is measured and recorded. o Wet core densities were calculated by the split and by the tray. o Core recovery was recorded. o The core was then dried and dry core masses are measured and recorded. o Dry core densities were then calculated. • Accepted gamma-density values at Arrowhead and Rhodes Ridge were estimated using inverse distance weighted to the second power (ID2) (80% of blocks) or scripted average in mineralised zones (20% of blocks) and inverse distance weighted to the first power (ID1) (40% of blocks) or scripted average in waste zones (60% of blocks). Classification Deposit Specific Statements: Arrowhead: • The Mineral Resource has been classified into the Inferred category as a result of the broad drill spacing. The determination of the applicable resource category has considered the relevant factors (geology, mineralisation continuity, sample spacing, data quality, and others). • The Competent Person is satisfied that the stated Mineral Resource classification reflects the relevant factors of the deposit. Rhodes Ridge: • The Mineral Resource has been classified into the Inferred category as a result of the broad drill spacing. The determination of the applicable resource category has considered the relevant factors (geology, mineralisation continuity, sample spacing, data quality, and others). • The Competent Person is satisfied that the stated Mineral Resource classification reflects the relevant factors of the deposit. Audits or reviews General Statements: • All stages of Mineral Resource estimation have undergone a documented internal peer review process, which has reviewed all phases of the process. No material issues were raised during the review. Discussion of relative accuracy/ confidence General Statements: • Rio Tinto Iron Ore operates multiple mines in the Pilbara region of Western Australia. The Mineral Resource data collection and estimation techniques used for Arrowhead and Rhodes Ridge are consistent with those applied at other deposits where mining has commenced. Reconciliation of actual production with the Mineral Resource estimates for individual deposits is generally accurate to within 10% for tonnes on an annual basis. This result is indicative of a robust process.
Appendix 2 1 Poonda - Table 1 The following table provides a summary of important assessment and reporting criteria used at the Poonda deposit for the reporting of Mineral Resources and Ore Reserves in accordance with the Table 1 checklist in The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition). Criteria in each section apply to all preceding and succeeding sections. Section 1 Sampling Techniques and Data Criteria Commentary Sampling techniques • Geological logging and assay samples were collected at 2 m intervals from reverse circulation (RC) and 1 m intervals from diamond (DD) drilling. All intervals were sampled. • Reverse circulation drilling during 2011 – 2019 utilised a rotary cone splitter beneath a cyclone return system to obtain a primary and secondary sample, with attention on samples collected being of comparable weights. The splitter produced two 8% samples (‘A’ and ‘B’) and one 84% reject sample. Primary ‘A’ sample was collected at 2 m intervals through 8% blades from the outer cone of the rotary cone splitter. • Reverse circulation drilling during 2006 - 2009 utilised various tiered riffle splitters where samples passed through beneath the cyclone to produce a 1 kg (retention) and 5 kg (analytical) sample. The laboratory sample was collected for analysis in a calico bag. • Diamond core drilling uses double and triple-tube techniques and samples were taken at 1 m intervals. • Dry core density samples were collected via diamond core drilling of HQ-3 and PQ-3 core. • Dry bulk density was derived from accepted gamma-density data collected at 10 cm intervals from down-hole geophysical sondes. Density measured from accepted gamma-density was corrected for moisture from diamond drill core twinned with reverse circulation drilling. • Metallurgical core samples were collected via diamond core drilling of PQ-3 core. • The presence of mineralisation was determined by a combination of geological logging and geochemical assay results. Drilling techniques • Reverse circulation drilling utilised 140 mm diameter face sampling bit with sample shroud, attached to a pneumatic piston hammer used to penetrate ground and deliver sample up 6 m drill rod inner tubes (4 m starter rod) to the cyclone and cone splitter with the aid of rig and auxiliary booster compressed air. • Wet drilling was introduced in late 2013; pre-2013, predominantly dry drilling was employed. • Drill holes completed as part of reverse circulation drilling programmes were mostly vertical with some angled holes drilled at -85 degrees for the purpose of downhole geophysics survey. • Diamond drilling was a combination of HQ and PQ core sizes (HQ-3 = 61.1 mm core diameter and PQ-3 = 83.0 mm core diameter) using double and triple tube techniques. • Core orientation data was collected where possible, predominantly within banded iron formation (BIF), hydrated zones or intervals of consolidated core. • Drill holes completed as part of the diamond drilling programmes were oriented vertical to near vertical. Drill sample recovery • For reserve circulation samples, sample weights were recorded at the laboratory as sample received, and a quantitative estimate of sample loss was made per drilling interval at the rig. • Diamond core recovery was maximised via the use of triple-tube sampling and additive drilling muds. • Diamond core recovery was recorded using rock quality designation (RQD) measurements with all cavities and core loss recorded in the Rio Tinto Iron Ore acQuire™ database. Only 2% of the total diamond drilled meters recorded intervals of core loss greater than or equal to 0.1 m. • Sample recovery in some friable mineralisation may be reduced however, thorough analysis of duplicate sample performance does not indicate any chemical bias as a result of inequalities in sample recovery. Logging • All drill holes were geologically logged utilising standard Rio Tinto Iron Ore Material Type Classification Scheme (RTIO MTCS) logging codes and entered into the acQuire™ database package on field Toughbook laptops. • Internal training and validation of logging includes RTIO MTCS identification and calibration workshops, peer reviews and validation of logging versus assay results. • Geological logging was performed on 2 m intervals for all reverse circulation drilling, and either 1 m or 2 m intervals for diamond holes, depending on the level of detail required. • All diamond drill core was photographed digitally, and files stored on Rio Tinto network servers. • Magnetic susceptibility readings were taken using a Kappameter for each interval. • Down hole geophysical surveys (in-rod gamma) were completed on most holes since 2008 and
Appendix 2 2 some of the holes from 2006 to 2007, with a further 94 holes surveyed for open-hole geophysical data (gamma, resistivity, magnetic susceptibility) from 2011 through 2019. Additional structural tele-viewer data was captured from 12 open holes in 2019. Sub-sampling techniques and sample preparation Sub-sampling techniques: • Diamond core was sampled as whole core. • 2011 to 2019: o Reverse circulation sub sampling was carried out using a rotary cone splitter beneath a cyclone return system, producing approximate mass splits of: ‘A’ Split – Analytical sample – 8% ‘B’ Split – Retention sample – 8%; all retention samples were placed in green plastic bags and stored in labelled 220 L steel drums. Bulk Reject – 84%. • 2006 to 2009: o Reverse circulation samples were passed through a four and three - tiered riffle splitter attached beneath the cyclone to produce approximate splits of: ‘A’ Split – Analytical sample – 5 kg ‘B’ Split – Retention sample – 1 kg Bulk Reject Sample preparation of the ‘A’ split sample: • 2011 to 2019: o ‘A’ split sample dried at 105 °C. o Sample crushed to -3 mm using Boyd Crusher and split using a linear and rotary sample divider to capture 1 – 2.5 kg samples. o Robotic and Manual LM5 used to pulverise total sample (1 to 2.5 kg) to 90% of weight passing 150 micron (μm) sieve. o A 100 g sub-sample was collected for analysis. o Diamond drill core samples were crushed to -6 mm particle size (whole core sample) and followed the reverse circulation sample preparation procedure. • 2006 to 2009: o Samples sorted, dried at 105 °C, weighed and crushed to -2 mm. Riffle split and pulverised to 95% passing 100 µm. The Competent Person considers that the sampling is representative of the in-situ material and that the procedures and sample sizes are appropriate for the style of mineralisation. Quality control samples, including duplicate samples were taken to check representivity as outlined below. Quality of assay data and laboratory tests Assay methods: • All assaying of samples used in Mineral Resource estimates have been performed by independent, National Association of Testing Authorities (NATA) certified laboratories. • 2011 to 2019: o Fe, SiO2, Al2O3, TiO2, Mn, CaO, P, S, MgO, K2O, Zn, Pb, Cu, Ba, V, Cr, Cl, As, Ni, Co, Sn, Sr, Zr, Na were assayed using industry standard lithium tetraborate and lithium metaborate fusion and X-Ray Fluorescence (XRF) analytical technique. o Loss on Ignition (LOI) was determined using industry standard Thermo-Gravimetric Analyser (TGA) and was measured at three steps of temperatures: 140 – 425 °C, 425 – 650 °C, 650 - 1000 °C. o 2011 to 2018 samples were submitted to Genalysis Laboratory in Perth. 2019 samples were submitted to Bureau Veritas (formerly Ultratrace Laboratories) in Perth. • 2006 to 2009: o XRF analytical using fused bead technique for the following elements: Fe, SiO2, Al2O3, TiO2, Mn, CaO, P, S, MgO, K2O, Zn, Pb, Cu, Ba, V, Cr, Cl, As, Ni, Co, Sn, Sr, Zr, Na, U, Th. o LOI using Thermo Gravimetric Analysers at 371 °C, 372 -538 °C and 539 -1000 °C and LOI 1000 °C. o 2006-2009 samples were submitted to Ultratrace Laboratories in Perth. Quality assurance measures: • Insertion of coarse reference standard by Rio Tinto geologists at a rate of one in every 30 samples in mineralised zones and one in every 60 samples in waste zones with a minimum of one standard per drill hole. Reference material was prepared and certified by Rio Tinto Iron Ore following ISO 3082:2009 (Iron Ores – Sampling and sample preparation procedures) and ISO 9516-1:2003 (Iron Ores – Determination of various elements by X-ray fluorescence spectrometry – Part 1:
Appendix 2 3 Comprehensive procedure). • Coarse reference standards contain a trace of strontium carbonate that was added at the time of preparation for ease of identification. • Reverse circulation field duplicates were collected by using a ‘B’ split retention sample, which was taken directly from the rig splitter. Duplicate insertion occurred at a frequency of one in 20. Trace zinc was included in the duplicate sample for later identification. • At a frequency of one in 20, -3 mm splits and pulps were collected as laboratory splits and repeats respectively. These sub-samples were analysed at the same time as the original sample to assess sampling precision. • Internal laboratory quality assurance and quality control measures involved the use of internal laboratory standards using certified reference material in the form of pulps; blanks and pulp duplicates were also inserted in each batch. • Random re-submission of pulps at an external laboratory was performed following initial analysis. • Chemical Analysis Testing (CAT) and Analytical Precision Testing (APT) samples were collected one per batch and submitted to a third-party (Geostats Pty Ltd) to check analytical precision and accuracy as part of Rio Tinto Iron Ore’s quality assurance and quality control (RTIO QA/QC) procedures. • Analysis of the performance of certified standards, field duplicates, blanks and third-party check assaying has indicated an acceptable level of accuracy and precision with no significant bias or contamination. Verification of sampling and assaying • Comparison of reverse circulation and twinned diamond drill core assay data distributions show that the drilling methods have similar grade distributions, verifying the suitability of using reverse circulation and diamond samples in the Mineral Resource estimate. • Field data was logged directly onto field Toughbook laptops using pre-formatted and validated logging templates, with details uploaded to the acQuire™ database on a daily basis. • Assay data was returned electronically from the laboratory and uploaded into the acQuire™ database. • 2012-2019, assay data were only accepted in acQuire™ database once the quality control process was completed, utilising Batch Analysis tool. • Written procedures outline the processes of geological logging and data importing, quality assurance and quality control validation and assay importing. A robust, restricted-access database is in place to ensure that any requests to modify existing data go through appropriate channels and approvals, and that changes are tracked by date, time, and user. Location of data points • Drill hole collar reduced level (RL) data was compared to detailed topographic maps and showed that the collar survey data was accurate. • 2012 to 2019 drill holes were surveyed in Mine Grid of Australia 1994 (MGA94) Zone 50 coordinates using Differential Global Positioning System (DGPS) survey equipment, accurate to 10 cm in both horizontal and vertical directions. • Collar location data was validated by checking actual versus planned coordinate discrepancies. Once validated, the survey data was uploaded into the acQuire™ database • 2006 to 2009 drill hole locations were acquired using handheld GPS, and then registered to topographic surface as they were captured using less accurate equipment. • Down-hole surveys with an in-rod gyro tool were conducted on approximately 40% of drill holes, generally for 2012 to 2019 holes greater than 100 m in depth. • The topographic surface was created from 30 m Shuttle Radar Topography Mission (SRTM) grid data, 25 m Rio Tinto Exploration (RTX) surveyed Airborne Gravity Gradiometry – Digital Elevation Model (AGG DEM) data and combined with the surveyed drill collar locations. These three sets of points were then triangulated to produce the current topographic surface. Data spacing and distribution • The drill spacing across the deposit varies from 400 m x 100 m to 400 m x 400 m. • The data spacing and distribution is deemed sufficient by the Competent Person to establish geological and grade continuity appropriate for the Mineral Resource classification that has been applied. • Sample compositing has not been performed as samples were collected almost exclusively at 2 m intervals (98%). Orientation of data in relation to geological structure • Drill lines were orientated predominantly in a north-south direction perpendicular to the strike of the deposit. • Drill holes were predominantly vertical, which has been deemed appropriate given the overall flat to moderate dipping stratigraphy and mineralisation.
Appendix 2 4 Sample security • The sample chain of custody was managed by Rio Tinto Iron Ore • Analytical samples (‘A’ splits) were collected by field assistants, placed onto steel sample racks and delivered to Perth by a recognised freight service and then to the assay laboratory by a Perth-based courier service. Whilst in storage the samples were kept in a locked yard. • Retention samples (‘B’ splits) were collected and stored in drums at on-site facilities up until 2018. From 2019 onwards retention samples in a form of ‘B’ splits were not collected, with a 500 g coarse crushed split of 3 mm particle size stored at laboratory instead for 24 months. • 150 g of excess pulps from primary samples are retained indefinitely at laboratories and Rio Tinto Exploration pulp storage in Perth, Western Australia. Audits or reviews • Whilst no external audits have been performed specifically on Poonda sampling techniques or data, external audits for sites (using the same techniques) have been completed and found the methods and procedures to be satisfactory. • Internal Rio Tinto Iron Ore peer review processes and internal Rio Tinto technical reviews have been completed. These reviews concluded that the fundamental data collection techniques are appropriate. Section 2 Reporting of Exploration Results Criteria Commentary Mineral tenement and land tenure status • The Poonda and Poonda North tenements (E46/00580 and E46/00662) are located approximately 40 km northeast of Newman in the Shire of East Pilbara, Western Australia. The tenure is 100% owned and administered by Hamersley Iron Pty. Limited. • The reported resource sits within the Nyiyaparli Native Title claim. • There are numerous, small areas of designated archeological or heritage significance scattered throughout the modelled area. In consultation with the Rio Tinto Heritage Team and the Nyiyaparli People, at this stage, no sites have been excised from the Mineral Resource. Heritage and environmental surveys, and consultation with various groups and authorities will be an important part of any development and these will be undertaken as required. • There is no (other) known impediment to mining the Poonda deposit at this time Exploration done by other parties • Pre-2006 drilling was conducted by CRA; all data is currently available within Rio Tinto databases and no further historical work in the project area has been completed to our knowledge Geology • The Poonda deposit is a high phosphorous hematite-goethite Boolgeeda (BOL) Iron Formation deposit. Secondary mature Fe rich detrital deposits are also common to the area. • The Boolgeeda Iron Formation is the uppermost unit of the Hamersley Group, which is characterized by fine grained, finely laminated, iron oxide rich bands interbedded with thin shale laminations. • Mineralisation occurs as hematite-goethite and goethite, interpreted to be primarily derived from supergene leaching of Boolgeeda Iron Formation. • Within the project area, the geology is made up of Weeli Wolli Formation, Wongarra Formation, Boolgeeda Iron Formation and the Turee Creek Group, which are un-conformably overlain by Cretaceous and Tertiary sands. • The structure within the project area is dominated by the Poonda Fault, a regional scale northwest-southeast trending lineament in the north of the project area. This structure is interpreted to have up thrown the Hamersley Group against the Manganese Group to the north. The folding is usually open and symmetrical dome and basin type with axes predominantly orientated north-south and northeast-southwest with a later east-west Ophthalmia deformational event overprint.
Appendix 2 5 Drill hole Information Summary of drilling data used for the Poonda Mineral Resource estimate: Year Diamond Reverse Circulation # Holes Meters # Holes Meters 2006 - - 31 3,263 2007 - - 32 4,366 2008 - - 72 8,356 2009 - - 5 554 2012 - - 4 442 2013 - - 21 2,707 2014 - - 43 4,228 2015 - - 16 1,806 2016 4 420 18 2,012 2017 - - 30 2,872 2018 - - 22 2,806 2019 - - 34 3,124 Total 4 420 328 36,536 • An additional four (4) un-assayed diamond holes for 222 m were collected in 2012 for use in metallurgical test work. Data aggregation methods • Not relevant as exploration results are not being reported. Relationship between mineralisation widths and intercept lengths • Geometry of the mineralisation with respect to the drill hole angle is well-defined in most areas of the deposit. Local mapping, drilling and regional context indicate that the deposit is gently folded and slightly dipping to the southwest and mineralization is up to a maximum depth of 260 m. • The majority of drilling is vertical, perpendicular to the flat lying mineralisation, and hence intercept lengths are approximately equivalent to true width of mineralisation. Diagrams
Appendix 2 6 Figure 1 Poonda deposit location map Figure 2 Poonda deposit drill hole location map
Appendix 2 7 Figure 3 Poonda deposit west cross section Figure 4 Poonda deposit east cross section Balanced reporting • Not applicable as Rio Tinto Ltd has not released Exploration Results for this deposit. Other substantive exploration data • Geological surface mapping data has been collected across the Poonda deposit at 1:10,000 scale in 2004, and at 1:5,000 scale in 2014 and 2019. • Close spaced low-level aeromagnetic survey completed in 2007. • Ground Gravity surveys carried out in 2016 and 2017. • Metallurgical PQ Diamond drilling conducted in 2011 and 2018. • Density Diamond Drilling conducted in 2016.
Appendix 2 8 Further work • Further work at Poonda is planned to better define the orebody and improve structural understanding. Additional staged in-fill reverse circulation drilling, tests for lateral extensions and large-scale step-out drilling are required across the deposit. • Further diamond drilling for metallurgical, density, and geotechnical information is also required across the deposit. Section 3 Estimation and Reporting of Mineral Resources Criteria Commentary Database integrity • All drilling data is securely stored in the Rio Tinto Iron Ore acQuire™ database (RTIODB), managed by dedicated personnel within Rio Tinto Iron Ore. The system is backed up nightly on servers located in Perth, Western Australia. The backup system was tested in September 2020, demonstrating that the system is effective. • The import/exporting process requires limited keyboard transcription and has multiple built in safeguards to ensure information is not overwritten or deleted. These include: o Data is imported and exported through automated interfaces, with limited manual input; o In-built validation checks ensure errors are identified prior to import; o Once within the RTIODB, editing is very limited and warning messages ensure accidental changes are not made; o Audit trail records updates and deletions should an anomaly be identified; o Export interface ensures the correct tables, fields and format are selected. • The drill hole database used for Mineral Resource estimation has been internally validated. Methods include checking: o acQuire™ scripts for relational integrity, duplicates, total assay and missing / blank assay values; o Grade ranges in each domain; o Domain names; o Survey data down-hole consistency; o Null and negative grade values; o Missing or overlapping intervals; o Duplicate data. • Drill hole data was also validated visually by domain and compared to the geological model. Site visits • The RTIO Competent Persons have visited the Poonda deposit in 2017. No follow up was required as a result of this visit, and there have been no material changes at site since this time. Geological interpretation • Overall, the Competent Person’s confidence in the geological interpretation of the area is good, based on the quantity and quality of data available, and the continuity and nature of the mineralisation. • Geological modelling was undertaken by Rio Tinto geologists. The method involves interpretation of down-hole stratigraphy using surface geological mapping, lithological logging data, down-hole gamma data, and assay data. • Cross-sectional interpretation of each stratigraphic unit was performed followed by interpretation of mineralisation and hydration boundaries based on mapping, and drilling data. Three-dimensional wireframes of the sectional interpretations are created to produce the geological model. • The geological model was subdivided into domains defined by stratigraphy and mineralisation and both the composites and model blocks are coded with these domains. Blocks in domains are estimated using composites from the same domain. • The mineralisation is continuous. It is affected by stratigraphy, structure and weathering. The drill hole spacing is sufficient to capture grade and geology changes at a large scale. Mineralisation extends from surface to a maximum depth of 260 m. Dimensions • The Poonda deposit is divided into 2 lenses. The Eastern Lens extends approximately 5 km east-west along strike and 2 km along a north-south orientation. The Western Lens extends approximately 2 km east-west along strike and 500 m along a north-south orientation. Estimation and modelling techniques • Twelve grade attributes (Fe, SiO2, Al2O3, P, Mn, LOI, LOI425, LOI650, S, TiO2, MgO, and CaO), and density were estimated into the block model. • Estimates were completed into parent blocks (block size of 100 m (X) × 25 m (Y) × 5 m (Z)). • Parent blocks were sub-celled to the geological boundaries to preserve volume.
Appendix 2 9 • Mineralised domains were estimated by inverse distance to the power of two (ID2) with a small number of blocks (<10%) being assigned average grades via scripting. Non-mineralised domains were estimated by inverse distance weighting to the first power (ID1) or assigned average grades in minor domains via scripting where sufficient data was not available. These methods were deemed appropriate by the Competent Person for estimating the tonnes and grade of the reported Mineral Resources • The grade estimation process was completed using Maptek™ Vulcan™ software. • High yield limits were placed on minor variables (CaO, MgO, Mn) in some geological units to limit the influence of outlier sample data as deemed appropriate for the dataset. • Grades were extrapolated to a maximum distance of approximately 500 m from data points. • Statistical analysis was carried out on data for all domains. • The estimated model was validated using a combination of visual and statistical methods that showed that the estimate was reasonable. • No production data is available for reconciliation. Moisture • All Mineral Resource tonnages were estimated and reported on a dry basis. Cut-off parameters • The cut-off parameters applied for reporting of the Boolgeeda Mineral Resource is Fe ≥ 55% and Al2O3 ≤ 6.5%. Mining factors or assumptions • It is assumed that standard crushing and screening processes used by Rio Tinto Iron Ore will be applicable for the processing of Poonda Ore. Metallurgical factors or assumptions • It is assumed that a beneficiation plant will be applicable for the processing of Poonda ore by using gravity and heavy medium separation techniques. • Predicted yield and upgrade are based on metallurgical test work conducted on representative samples collected from the Poonda deposit. Environmental factors or assumptions • Rio Tinto Iron Ore has an extensive environmental approval process, and environmental studies will be completed during the project study phases to determine if the project requires formal State and Commonwealth environmental assessment and approval. • Mapping of oxidised shales, black carbonaceous shales, lignite, and the location of the water table, is used in prediction and planning for the treatment of potential environmental impacts. This process is in accordance with Rio Tinto’s Chemically Reactive Mineral Waste Standard. Bulk density • Dry bulk density was derived from gamma-density data collected at 10 cm intervals from down-hole geophysical sondes. Accepted gamma-density data was corrected for moisture using diamond drill core specifically drilled throughout the deposit. Dry core densities were generated via the following process: o The core volume was measured in the split and the mass of the core was measured and recorded. o Wet core densities were calculated by the split and by the tray. o Core recovery was recorded. o The core was then dried and dry core masses were measured and recorded. o Dry core densities were then calculated. • Accepted gamma-density values at Poonda were estimated using inverse distance weighted to the second power (ID2) (40% of blocks) or scripted average (60% of blocks) in mineralised zones and inverse distance weighted to the first power ID1(40% of blocks) or scripted average (60% of blocks) in waste zones. Classification • The Mineral Resource has been classified into the Inferred category as a result of the wide drill hole spacing. The determination of the applicable resource category has considered the relevant factors (geology, mineralisation continuity, sample spacing, data quality, and others). • The Competent Person is satisfied that the stated Mineral Resource classification reflects the relevant factors of the deposit. Audits or reviews • All stages of Mineral Resource estimation have undergone an internal peer review process, which has documented all phases of the process. No material issues were raised in the review. Discussion of relative accuracy/ confidence • Rio Tinto Iron Ore operates multiple mines in the Pilbara region of Western Australia. The Mineral Resource data collection and estimation techniques used for Poonda are consistent with those applied at other deposits where mining has commenced. Reconciliation of actual production with the Mineral Resource estimates for individual deposits is generally accurate to within 10% for tonnes on an annual basis. This result is indicative of a robust process.
Appendix 3 Western Range 36W–50W Deposit - Table 1 The following table provides a summary of important assessment and reporting criteria used at the Western Range 36W-50W deposit for the reporting of Mineral Resources and Ore Reserves, in accordance with the Table 1 checklist in The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition). Criteria in each section apply to all preceding and succeeding sections. Section 1 Sampling Techniques and Data Criteria Commentary Sampling techniques • Geological logging and assay samples were collected at 2 m intervals from reverse circulation (RC) drilling and from 1.5 m intervals for percussion drilling; all intervals were sampled. • Density and metallurgical samples were collected from PQ diamond (DD) core drilling. • Geotechnical samples were partly collected from HQ diamond core drilling. • Diamond core drilling uses double and triple-tube techniques and samples were taken at 1 m intervals. • Reverse circulation drilling utilised a rotary cone splitter beneath a cyclone return system to obtain a primary and secondary sample, with particular attention paid to samples collected being of comparable weights. The splitter produced two 8% samples (‘A’ and ‘B’) and one 84% reject sample. The primary ‘A’ sample was collected at 2 m intervals through 8% blades from the outer cone of the rotary cone splitter. • Percussion drilling utilised an extensive modified Schramm T64 rig with 900/350 air, which was supported by an auxiliary booster and high-volume air compressors. • The presence of mineralisation was determined by a combination of geological logging and geochemical assay results. Drilling techniques • Reverse circulation drilling utilised a 140 mm diameter face sampling bit with a sample shroud, attached to a pneumatic piston hammer. This was used to penetrate the ground and deliver the sample up the 6 m drill rod inner tubes (4 m starter rod) through to the cyclone and the rotary cone splitter. • Dry drilling was implemented as standard procedure for all drill holes up to 2014. As of 2014 wet drilling was implemented in order to mitigate the risks associated with fibrous mineral intersections. • Diamond drilling was HQ and PQ core sizes using double and triple tube techniques. • Core orientation data was collected where possible, predominantly within banded iron formation (BIF), hydrated zones or intervals of consolidated core. • Percussion drilling utilised an extensive modified Schramm T64 rig with 900/350 air, which was supported by an auxiliary booster and high-volume air compressors. • The drilling programmes were mostly vertical with some angled holes drilled (-60 to -85 degrees north and south), where there was limited area for a drill pad or specific geotechnical requirements. Drill sample recovery • For Reverse Circulation samples a qualitative estimate of sample loss at the rig was made, and in most cases a good representative sample was collected. Sample weights were recorded at the laboratory, upon receipt and after oven drying during 2011- 2019 drilling programmes. • Diamond core recovery was maximised via the use of triple-tube sampling and additive drilling muds. • Diamond core recovery was recorded using rock quality designation (RQD) measurements with all cavities and core loss recorded in the Rio Tinto Iron Ore acQuire™ database (RTIODB). Only 2% of the total diamond drilled meters recorded intervals of core loss greater than or equal to 0.1m. • Sample recovery in some friable mineralisation may be reduced however, thorough analysis of duplicate sample performance does not indicate any chemical bias as a result of inequalities in sample recovery. Logging • All drill holes were geologically logged utilising standard Rio Tinto Iron Ore Material Type Classification Scheme (RTIO MTCS) logging codes and entered into the Rio Tinto Iron Ore acQuire™ database (RTIODB) on field Toughbook laptops. Pre-2004, this was performed using pre-formatted paper logging sheets and transferred manually to the RTIODB. • Internal training and validation of logging included RTIO MTCS identification and calibration workshops, peer reviews and validation of logging versus assay results. • Geological logging was performed on 2 m intervals for all reverse circulation drilling and 1.5 m intervals for percussion drilling. • Magnetic susceptibility readings were taken using a Kappameter for each interval. • Open-hole acoustic and optical televiewer image data was collected in specific Reverse
Appendix 3 2 Circulation holes throughout the deposit for structural analyses. • All diamond drill core and reverse circulation chip piles were photographed digitally, and files stored on Rio Tinto network servers. • 2011 to 2019: in-rod gamma trace and deviation with calliper, density, resistivity, and magnetic susceptibility was also captured for selected holes. • 2002: drill holes were logged for downhole deviation using a gyroscope and magnetic susceptibility. • Pre-2002: gamma logging was conducted using a portable downhole unit. Sub-sampling techniques and sample preparation Sub-sampling techniques • Diamond core was sampled as whole core. • 2011 – 2019: o Dry and wet reverse circulation drilling was sampled at 2 m intervals. Sub-sampling was carried out using a rotary cone splitter beneath a cyclone return system, producing approximate mass splits of: ‘A’ Split – Analytical sample – 8% ‘B’ Split – Retention sample – 8%; all retention samples were placed in green plastic bags and stored in labelled 220 L steel drums. Bulk Reject – 84%. • 2002: o Dry reverse circulation drilling was sampled at 2 m intervals. Sub-sampling was carried out using a 4-way Jones riffle splitter attached beneath the cyclone, with the final splits being: 87.5% waste; 6.25% laboratory sample and 6.25% retention sample. o The laboratory sample was collected in a calico bag, and the retention sample was collected in a plastic ‘honey-pot’ (screw-top plastic jar). • Pre-2002: o Dry reverse circulation drilling was sampled at 2 m intervals (Reverse Circulation) and 1.5 m (Percussion) utilising a riffle splitter. If the samples were wet, a dual adjustable divider, which filled a 20 litre bucket lined with a large calico sample bag, was used. These sample bags were then placed in sample racks for drying. o One reference sample of approximately 1 kg was collected in a ‘honey pot’ with a sample tag placed inside the container. Sample preparation of the ‘A’ split sample: • 2011 – 2019: o Samples were dried at 105 °C. o Samples were crushed to -3 mm using a Boyd Crusher and split using a rotary sample divider to capture 1 – 2.5 kg samples. o Manual LM5 was used to pulverise the total sample (1 –to2.5 kg) to 90% of the weight passing through a 150 micron (μm) sieve. o A 100 g sub-sample was collected for analysis. o Diamond drill core samples were crushed to -6 mm particle size (whole core sample) and followed the reverse circulation sample preparation procedure. • 2002: o The samples were dried for over 16 hrs and then cooled before preparation. The samples barcode was read, and a vial label printed. o The sample was either poured into the crusher splitter (samples < 7 kg) or a preliminary splitting stage was performed. o A 100 to 150 g portion was generated and placed in a labelled sample vial which travelled automatically to one of two automatic mills. The sample was pulverised for 90 seconds to 95% passing -150 μm. • Pre-2002: o The 5 kg drill sample was crushed to <3 mm, then passed through a Jones Riffle splitter and reduced to a 200 g sample. The sample was then dried at 105 °C for three hours, then crushed in a Siebtechnik disc mill to a minus 150 μm sieve. o A 0.4 g aliquot of the Siebtechnik milled sample was taken and made into a fused borate glass bead. The bead was analysed by using a Philips 1600 XRF machine. The Competent Person considers that the sampling is representative of the in-situ material and that the procedures and sample sizes are appropriate for the style of mineralisation. Quality control samples, including duplicate samples were taken to check representivity as outlined below.
Appendix 3 3 Quality of assay data and laboratory tests Assay methods • All assaying of samples used in the Mineral Resource estimates have been performed by independent National Association of Testing Authorities (NATA) certified laboratories. • 2011 to 2019: o Fe, SiO2, Al2O3, TiO2, Mn, CaO, P, S, MgO, K2O, Zn, Pb, Cu, Ba, V, Cr, Cl, As, Ni, Co, Sn, Sr, Zr and Na were assayed using industry standard lithium tetraborate and lithium metaborate fusion and X-Ray Fluorescence (XRF) analytical techniques. o Loss on Ignition (LOI) was determined using an industry standard Thermo-Gravimetric Analyser (TGA) and was measured at three steps of temperatures: 140° - 425° C, 425° - 650° C, 650° - 1000° C. o Samples were dispatched to Perth for preparation and analytical testing at Bureau Veritas Laboratories in Perth (formerly Ultratrace Laboratories for 2011 to 2013 programmes) and to Intertek/Genalysis in Perth for 2017 to 2019 programmes. • 2002: o Fe, SiO2, Al2O3, TiO2, Mn, CaO, P, S, and MgO were assayed using industry standard lithium tetraborate and lithium metaborate fusion and XRF analytical techniques. o LOI was measured using a thermogravimetric analyser and measured at a single temperature (1000 °C). o Samples were dispatched to Rio Tinto’s internal laboratory at Dampier for preparation and analytical testing. • Pre-2002: o Fe, SiO2, Al2O3, TiO2, MnO, CaO, P, S, and MgO, were assayed using a borate flux to make a fused glass bead. The bead was then analysed by XRF. o LOI determination was performed on a 1 g sub-sample, split from the millings which were heated to 900° C for 35 minutes using a LECO TGA 500 analyser. o Samples were dispatched to Rio Tinto’s internal laboratory at Dampier for preparation and analytical testing. Quality assurance measures: • 2011 – 2012 to present: o Insertion of coarse reference standard by Rio Tinto geologists at a rate of one in every 30 samples in mineralised zones and one in every 60 samples in waste zones with a minimum of one standard per drill hole. Reference material was prepared and certified by Rio Tinto Iron Ore following ISO 3082:2009 (Iron Ores – Sampling and sample preparation procedures) and ISO 9516-1:2003 (Iron Ores – Determination of various elements by X-ray fluorescence spectrometry – Part 1: Comprehensive procedure). o Coarse reference standards contain a trace of strontium carbonate that was added at the time of preparation for ease of identification. o Reverse circulation field duplicates were collected by using a ‘B’ split retention sample, which was taken directly from the rig splitter. Duplicate insertion occurred at a frequency of one in 20. Trace zinc was included in the duplicate sample for later identification. o At a frequency of one in 20, -3 mm splits and pulps were collected as laboratory splits and repeats respectively. These sub-samples were analysed at the same time as the original sample to assess sampling precision. o Internal laboratory quality assurance and quality control measures involved the use of internal laboratory standards using certified reference material in the form of pulps; blanks and pulp duplicates were also inserted in each batch. o Random re-submission of pulps at an external laboratory was performed following initial analysis. o Chemical Analysis Testing (CAT) and Analytical Precision Testing (APT) samples were collected one per batch and submitted to a third-party (Geostats Pty Ltd) to check analytical precision and accuracy as part of Rio Tinto Iron Ore’s quality assurance and quality control (RTIO QA/QC) procedures. o Analysis of the performance of certified standards, field duplicates, blanks and third- party check assaying has indicated an acceptable level of accuracy and precision with no significant bias or contamination. • 2002: o A duplicate sample was collected from the mineralised zone, at a frequency of approximately one per hole for the purpose of measuring sampling precision. The duplicate sample replaced one of the retention samples and was allocated a laboratory sample number in sequence within the mineralised zone. o At an approximate rate of one every hole, a pre-prepared standard sample of known
Appendix 3 4 analysis was introduced into the samples, for the purpose of monitoring accuracy of the laboratory. These check standards were allocated a laboratory sample number in sequence within mineralised zone. • Pre 2002: o Duplicate samples were taken from selected intervals at conclusion of drilling. Standards were also introduced into the system at a frequency of 1 per hole, or if the hole was <100m in depth, at a frequency of approximately every 100 m of sampling. Verification of sampling and assaying • Field data was logged directly onto field Toughbook laptops using pre-formatted and validated logging templates, with details uploaded to the Rio Tinto Iron Ore database (RTIODB) on a daily basis. Pre-2004 this was performed using pre-formatted paper logging sheets and transferred manually to the RTIODB. • The assaying of post 2002 samples used in the Mineral Resource estimates were performed by independent National Association of Testing Authorities (NATA) certified laboratories. Samples from 2002 and earlier were assayed at Dampier which carried an ISO9001 accreditation. • Assay data was returned electronically from the laboratory and uploaded into the RTIODB. • Assay data was only accepted into the RTIODB once the quality control assessment was completed. • Written procedures outline the processes of geological logging and data importing, quality assurance and quality control validation and assay importing. A robust, restricted-access database was in place to ensure that any requests to modify existing data go through appropriate channels and approvals, and that changes are tracked by date, time, and user. • Assay data has not been adjusted. • In 2011, twenty-six (26) PQ diamond holes were drilled as twins for Metallurgical purposes. • Analysis of the twinned drill hole assay data distributions (except for one hole which was used for metallurgical testing) showed that the drilling methods displayed similar grade and geological distributions and verified the suitability for all samples to be used in the Mineral Resource estimate. Location of data points • The drill holes were surveyed in Mine Grid of Australia 1994 (MGA94) Zone 50 coordinates using Differential Global Positioning System (DGPS) survey equipment, which was accurate to 10 cm in both horizontal and vertical directions. Upon receipt of the coordinate data it was validated against the planned drill hole coordinates, and then uploaded to the drill hole database. All holes were surveyed by qualified surveyors. • The topographic surface was created from Light Detecting and Ranging (LiDAR) data (points spaced 5 m apart) captured in 2017. • Drill hole collar reduced level (RL) data was validated against 5 m 2017 LiDAR topographic survey and showed that the collar survey data was accurate. • Down-hole surveys were conducted on every hole, with the exception of collapsed or otherwise hazardous holes. Significant, unexpected deviations were investigated and validated. Holes greater than 100 m depth were surveyed with an in-rod gyro tool. • The pre-1997 drill holes were re-surveyed using DGPS; however, not all holes could be located and therefore the survey method for these holes is unknown and presumed to be planned coordinates. This has been taken into consideration in the resource classification. Data spacing and distribution • The drill spacing across the deposit is mostly 60 m x 60 m with some parts of the deposit drilled out to 30 m x 30 m. • The data spacing and distribution is deemed sufficient by the Competent Person to establish geological and grade continuity appropriate for the Mineral Resource classification that has been applied. • Samples were composited to 2 m. Orientation of data in relation to geological structure • Drill lines were perpendicular to geological structure at an approximate of 333 degrees north. • Drilling was predominantly vertical which is appropriate for the sub-horizontal to inclined stratigraphy of the majority of the deposit. • Angled holes were drilled where appropriate and also for geotechnical purposes. • While mineralisation was frequently intersected at an angle, the orientation of mineralisation relevant to drilling was not considered likely to have introduced any material bias. Sample security • The sample chain of custody was managed by Rio Tinto Iron Ore . • Analytical samples (‘A’ splits) were collected by field assistants, placed into bulk bags and delivered to Perth by a recognised freight service and then to the assay laboratory by a Perth- based courier service. Whilst in storage, the samples were kept in a locked yard. • Retention samples (‘B’ splits) were collected and stored in drums at on-site facilities up to end
Appendix 3 5 of 2018 drill programmes. In 2019 retention samples in a form of ‘B’ splits were not collected, with a 500 g coarse crushed split of 3 mm particle size stored at laboratory instead for 24 months. • 150 g of excess pulps from primary samples are retained indefinitely at laboratories and external storage facilities at CTI Logistics Ltd in Perth, Western Australia. Audits or reviews • Rio Tinto Group Internal Audit engages SRK Consulting to complete an audit on 36W-50W in 2020, including all aspects of data, interpretation, estimation, and mine planning with the result being satisfactory. No material findings were identified. • Internal Rio Tinto Iron Ore peer review processes and internal Rio Tinto technical reviews were completed. These reviews concluded that the fundamental data collection and modelling techniques were appropriate. Section 2 Reporting of Exploration Results Criteria Commentary Mineral tenement and land tenure status • The Western Range 36W-50W deposit is located within Mining Lease AM70/00246 (ML246SA). • Discussions about a Joint Venture covering the Western Range mining hub with China Baowu Group are continuing. Exploration done by other parties • In 1968 and from 1979 to 1996 exploration drilling was conducted by Hamersley Exploration (Task Force) and CRA Exploration; all data is currently available within Rio Tinto databases. Geology • The Western Range 36W-50W deposit is a typical high-phosphorus, martite-goethite Brockman type deposit. • Mineralisation occurs within both the Dales Gorge and Joffre Members of the Brockman Iron Formation. Minor mineralisation also occurs in the Whaleback Shale, Yandicoogina Shale and Weeli Wolli Members. • There is minor detrital mineralisation, which occurs as shallow fan shaped deposits to the south of the range and small canga deposits close to the range front. • Western Range is bounded to the east by the 36W steep reverse fault and to the west by the 72W fault. • There are numerous smaller scale faults trending northwest and east-northeast. Numerous dolerite dyke intrusions cross cut and overprint faults. There are also numerous dolerite sills in the area within the Whaleback Shale, Joffre, Yandicoogina Shale and Weeli Wolli Members. • Eighteen (18) mapped faults lie within the Western Range 36W-50W deposit, with varying trends and throws. • Several dolerite dykes bisect the area, and largely follow fault lines which tend to trend northwest to southeast. • The major Joffre sill runs east to west across the area and is offset by the northwest-southeast trending faults. Another minor sill lies within the Whaleback Shale 2 layer, but this is only present in 36W. • Approximately 90% of the Mineral Resource lies above the water table. Drill hole Information • Summary of drilling data used for the Western Range 36W-50W Mineral Resource estimate. Year Diamond Percussion Reverse Circulation # Holes Metres # Holes Metres # Holes Metres 1968 - - 6 352 - - 1979 - - 22 2219 - - 1980 - - 26 3030 - - 1987 - - 1 279 - - 1989 - - 17 1005 - - 1990 - - 11 1143 - -
Appendix 3 6 Criteria Commentary 1992 - - - - 12 1929 1993 - - - - 18 2749 1996 - - - - 30 3672 2002 - - - - 347 26856 2011 26 1,803 - - 260 22,108 2012 39 4,203 - - 190 15,175 2017 - - - - 1 130.1 2018 20 1,820 - - 37 3,026 2019 6 681 - - 92 10,404 Total 91 8,507 83 8028 987 86,049 • Only data from 1996 to 2019 was used for grade estimation. Pre-1996 data was used for geological interpretation only. • There has been an update to the Western Range 36W-50W drillhole database from what was reported in the 2019 JORC Table 1 following a review of drilling data Data aggregation methods • Not relevant as exploration results are not being reported. Relationship between mineralisation widths and intercept lengths • Geometry of the mineralisation with respect to the drill hole angle was well-defined in most areas of the deposit. Drilling was predominantly vertical which is appropriate for the sub-horizontal to inclined stratigraphy of the majority of the deposit; and hence intercept lengths are approximately equivalent to true width of mineralisation. Diagrams Figure 1 Western Range 36W-50W deposit location map
Appendix 3 7 Criteria Commentary Figure 2 Western Range 36W-50W deposit drill hole location map Figure 3 Western Range 36W-50W deposit cross section Balanced reporting • Not applicable, as Rio Tinto has not specifically released Exploration Results for this deposit.
Appendix 3 8 Criteria Commentary Other substantive exploration data • Geological mapping data was collected across the Western Range 36W-50W deposit in 2011 at the 1:5,000 scale. Further work • Further work at the Western Range 36W-50W deposit is planned to better define the orebody and improve structural understanding. Additional infill reverse circulation drilling is required across the deposit. • Further diamond drilling for metallurgical, density, and geotechnical information is also required across the deposit. Section 3 Estimation and Reporting of Mineral Resources Criteria Commentary Database integrity • All drilling data is securely stored in the Rio Tinto Iron Ore acQuire™ database (RTIODB), managed by dedicated personnel within Rio Tinto Iron Ore. The system is backed up nightly on servers located in Perth, Western Australia. The backup system was tested in September 2020, demonstrating that the system is effective. • The import/exporting process requires limited keyboard transcription and has multiple built in safeguards to ensure information is not overwritten or deleted. These include: o Data is imported and exported through automated interfaces, with limited manual input; o Inbuilt validation checks ensure errors are identified prior to import; o Once within the RTIODB, editing is very limited and warning messages ensure accidental changes were not made; o Audit trail records updates and deletions should an anomaly be identified; o Export interface ensures the correct tables, fields and format are selected. • The drill hole database used for Mineral Resource estimation has been internally validated. Methods include checking: o acQuire™ scripts for relational integrity, duplicates, total assay and missing / blank assay values; o Grade ranges in each domain; o Domain names; o Survey data down-hole consistency; o Null and negative grade values; o Missing or overlapping intervals; o Duplicate data. • Drill hole data was also validated visually by domain and compared to the geological model. Site visits • The Competent Person visited the Western Range 36W-50W deposit in 2018. No follow up was required as a result of this visit, and there has been no material changes at site since this time. Geological interpretation • Overall the Competent Person’s confidence in the geological interpretation of the area is good, based on the quantity and quality of data available, and the continuity and nature of the mineralisation. • Geological modelling was performed by Rio Tinto Iron Ore geologists. The method involves interpretation of stratigraphy using surface geological mapping, lithological logging data, down- hole gamma data, and assay data. • Cross-sectional interpretation of each stratigraphic unit was performed followed by interpretation of mineralisation and hydration boundaries based on mapping, and drilling data. Three-dimensional wireframes of the sectional interpretations are created to produce the geological model. • The geological model was subdivided into domains defined by stratigraphy and mineralisation and both the composites and model blocks are coded with these domains. Blocks in domains are estimated using composites from the same domain. • Mineralisation is continuous. It is affected by stratigraphy, structure and weathering. The drill hole spacing is sufficient to capture density, grade and geology variation for Mineral Resource reporting. Dimensions • The Western Range 36W-50W deposit strikes approximately east-west with an along strike extent of approximately 6 km and a width of up to approximately 1 km. The mineralisation extends from surface to a depth of 250 m.
Appendix 3 9 Estimation and modelling techniques • Twelve grade attributes (Fe, SiO2, Al2O3, P, Mn, LOI, LOI425, LOI650, S, TiO2, MgO, and CaO), and density were estimated into the block model. • Estimates were completed into parent blocks (block size of 30 m (X) × 30 m (Y) × 5 m (Z)). • Parent blocks are sub-celled to the geological boundaries to preserve volume. • The grade estimation process was completed using Maptek™ Vulcan™ software. • Estimates were completed on parent blocks. • Mineralised domains were estimated by ordinary kriging or inverse distance to the power of two (ID2) (>70% of blocks) with approximately 30% of blocks being assigned average grades via scripting. Non-mineralised domains were estimated by inverse distance weighting to the first power (ID1) or assigned average grades in minor domains via scripting where sufficient data was not available. These methods are deemed appropriate by the Competent Person for estimating the tonnes and grade of the reported Mineral Resources. • Grades were extrapolated to a maximum distance of approximately 400 m from data points. • Statistical analysis was carried out on data for all domains. • The estimated model was validated using a combination of visual and statistical methods that showed that the estimate was reasonable. • No production data is available for reconciliation. Moisture • All Mineral Resource tonnages are estimated and reported on a dry basis. Cut-off parameters • The cut-off for reporting of Brockman Mineral Resources is greater than or equal to 60% Fe*. • The cut-off for reporting of Brockman Process Ore Mineral Resources is material 50% ≤ Fe < 60% and 3% ≤ Al2O3 < 6%*. *geology domain must be Dales Gorge, Joffre or Footwall Zone for inclusion in the Mineral Resource. Mining factors or assumptions • Development of this Mineral Resource assumes mining using standard Rio Tinto Iron Ore equipment and methods similar to other Rio Tinto Iron Ore operations. The assumed mining method is conventional truck and shovel, open pit mining at an appropriate bench height. Mining practices will include grade control utilising blast hole data. • Rio Tinto Iron Ore plans to blend ore from Western Range 36W-50W deposit with ore from other Rio Tinto Iron Ore mine sites to make a saleable ore product. This plan is in line with current Rio Tinto Iron Ore practices where ore from multiple mines is combined to produce the Pilbara Blend product. Metallurgical factors or assumptions • The technologies assumed applicable for the processing of the Western Range 36W-50W deposit are standard crushing and screening processes followed by desliming of fines ore. Environmental factors or assumptions • Rio Tinto Iron Ore has an extensive environmental approval process. A review of these requirements was undertaken as part of a Pre-feasibility Study and based on this work the proposal was determined to require formal State environmental assessment and approval. This is documented in greater detail in Section 4. • Mapping of oxidised shales, black carbonaceous shales, lignite, and the location of the water table, is used in prediction and planning for the treatment of potential environmental impacts. This process is in accordance with Rio Tinto’s Chemically Reactive Mineral Waste Standard. Bulk density • Dry bulk density was derived from gamma-density data collected at 10 cm intervals from down- hole geophysical sondes. Accepted gamma-density data was corrected for moisture using diamond drill core specifically drilled throughout the deposit. • Dry core densities were generated via the following process: o The core volume was measured in the split and the mass of the core was measured and recorded. o Wet core densities were calculated by the split and by the tray. o Core recovery was recorded. o The core was then dried and dry core masses are measured and recorded. o Dry core densities were then calculated. • Accepted gamma-density values at Western Range 36W-50W were estimated using ordinary kriging or inverse distance weighted to the second power (ID2) (>60% of blocks) or scripted average (40% of blocks) in mineralised zones and inverse distance weighted to the first power ID1or scripted average in waste zones. Classification • The Mineral Resource has been classified into the categories of Measured, Indicated and Inferred. The determination of the applicable resource category has considered the relevant factors
Appendix 3 10 (geology, mineralisation continuity, sample spacing, data quality, and others). • The Western Range 36W-50W Mineral Resource has seen some reclassification of Measured Resource into Indicated and Inferred from the previous resource model. By incorporating reconciliation findings from analogous mined deposits and having regard to the complex structure and mineralisation style of this deposit, the resource classification has been updated . • Measured Resource is bedded mineralisation that demonstrates good or reasonable geological and grade continuity and is drilled at 30 m x 30 m spacing. • Indicated Resource is bedded mineralisation that has reasonable geological and grade continuity and is drilled at 120 m x 60 m spacing. • Inferred Resource is bedded mineralisation with drill spacing greater than 30 m x 60 m, or open mineralisation along domain margins and at depth with no drill support, or bedded mineralisation with limited continuity or limited drill support across strike, or Mature Detrital, or Hydated mineralisation. • Approximately 90% of the Western Range 36W-50W Mineral Resource lies above the water table. The Competent Person is satisfied that the stated Mineral Resource classification reflects the relevant factors of the deposit. Audits or reviews • All stages of Mineral Resource estimation have undergone a documented internal peer review process, which has reviewed all phases of the process. No material issues were raised during the review. • Rio Tinto Group Internal Audit engages SRK Consulting to complete an audit on 36W-50W in 2020, including all aspects of data, interpretation, estimation, and mine planning with the result being satisfactory. No material findings were identified. Discussion of relative accuracy/ confidence • Rio Tinto Iron Ore operates multiple mines in the Pilbara region of Western Australia. The Mineral Resource data collection and estimation techniques used for Western Range 36W-50W deposit are consistent with those applied at other deposits which are being mined. Reconciliation of actual production with the Mineral Resource estimates for individual deposits is generally accurate to within ten percent for tonnes on an annual basis. This result is indicative of a robust process. • The accuracy and confidence of the Mineral Resource estimate is consistent with the current level of study (Pre-Feasibility Study). Section 4 Estimation and Reporting of Ore Reserves Criteria Commentary Mineral Resource estimate for conversion to Ore Reserves • Generation of the modifying factors for this Ore Reserve estimate were based on a Mineral Resource estimate for Western Range 36W-50W, completed in January 2020. • The most recent Mineral Resource estimate together with the latest update of pit designs were used for reporting Ore Reserves. • The declared Ore Reserves are for the Western Range 36W-50W deposit. • Mineral Resources are reported additional to Ore Reserves. Site visits • The Competent Person visited the Western Range 36W-50W deposit in 2018. Study status • The Greater Paraburdoo mine site is an existing operation. The Western Range 36W-50W deposit forms an extension to the operating life of the Greater Paraburdoo operations. • The Pre-Feasibility Study was completed in Q3 2019. Currently conducting the Feasibility Study with expected completion in 2022. Cut-off parameters • The Western Range 36W-50W deposit is reported using variable cut-off grade (VCoG), in line with a number of other Pilbara deposits. Application of VCoG allows the variation of the head grade across the life of the deposit, to achieve desired product grades. At Western Range 36W-50W, this approximates to a cut-off of 58.5% Fe over the mine life. Mining factors or assumptions • The Mineral Resource models for Western Range 36W-50W were regularised to a block size of 15 m (X) x 15 m (Y) x 10 m (Z) which was determined as the selective mining unit, following an analysis of a range of potential selective mining units. • Metallurgical models were applied to the regularised model in order to model product tonnages, grades and yields.
Appendix 3 11 • Pit optimisations utilising the Lerchs-Grossmann algorithm with industry standard software were undertaken. This optimisation utilised the regularised Mineral Resource model, together with cost, revenue, and geotechnical inputs. The resultant pit shells were used to develop detailed pit designs with due consideration of geotechnical, geometric and access constraints. These pit designs were used as the basis for production scheduling and economic evaluation. • During the above process, Inferred Mineral Resources were excluded from mine schedules and economic valuations were utilised to validate the economic viability of the Ore Reserves. • The Western Range 36W-50W Mineral Resource has seen some reclassification of Measured Resource into Indicated and Inferred from the previous resource model, resulting in this material being removed from the Ore Reserve. By incorporating reconciliation findings from analogous mined deposits and having regard to the complex structure and mineralisation style of this deposit, the resource classification has been updated. • Conventional mining methods (truck and shovel), similar to other Rio Tinto Iron Ore operating mines, were selected. • Applied geotechnical parameters are based on geotechnical studies informed by technical assessment of 78 drill holes drilled, specifically for geotechnical purposes between 2012 and 2019. The resultant inter-ramp slope angles vary between 24° and 52°, depending on slope sector rock mass and/or structural geological conditions. • The Pre-Feasibility Study considered the infrastructure requirements associated with the conventional truck and shovel mining operation, including crushing and conveying systems, dump and stockpile locations, maintenance facilities, access routes, explosive storage, water, and power. • The Ore Reserves are 99% above water table. Metallurgical factors or assumptions • The Western Range 36W-50W ore will be processed through the Paraburdoo processing facility, which comprises a dry crushing and screening facility with desliming. This style of processing is well suited to the Brockman ore at Western Range 36W-50W deposit. • Dry crushing and screening with desliming of fine ore has been utilised at Paraburdoo since 1996 and is well understood. • Metallurgical drilling campaigns have been conducted at Greater Western Range operations (incorporating the 27W, 36W-50W and 55-66W deposits) from 2003-2018, with 57 PQ diamond holes drilled specifically throughout the Western Range 36W-50W deposit. A total of 154 composites of high-grade ore (totalling 2,257 m) and 81 composites of low-grade ore (totalling 1125 m), were processed using the standard Brockman plant mimic, which has been calibrated to produce representative plant products. A map of the metallurgical drilling is shown below. Figure 4 Metallurgical drilling locations • The diamond drill core test results were utilised to develop metallurgical models representing different metallurgical domains that were considered representative of the ore body. The metallurgical models predict product tonnage and grade parameters for lump and fines products.
Appendix 3 12 Environmental • The Greater Paraburdoo Iron Ore Hub (Proposal) was formally referred to the Environmental Protection Authority (EPA) under section 38 of the Environmental Protection Act 1986 (EP Act) on 5 November 2018. The EPA determined that the Proposal warranted assessment at the level of Public Environmental Review with a two-week public review period (EPA Assessment No. 2189) on 7 December 2018. • The Proposal was also referred to the Department of Agriculture, Water and the Environment (DAWE) on 6 December 2018 (EPBC Act reference: EPBC 2018/8341) and on 24 January 2019, the delegate for the Commonwealth Minister for the Environment determined that the Proposal is a controlled action under s. 75 of the EPBC Act, requiring further assessment and approval. • The EPA is assessing the Proposal as an accredited assessment on behalf of the Commonwealth under s. 87 of the EPBC Act. This assessment provides for a single environmental assessment process conducted by the State. At the completion of the assessment, the EPA’s Report is provided to the DAWE assessing the likely impacts of the Proposal on Matters of National Environmental Significance. • The Proponent (Rio Tinto) prepared an Environmental Scoping Document (ESD) in January 2019. The ESD identified the following key environmental factors relevant to the Proposal: Flora and Vegetation; Terrestrial Fauna; Subterranean Fauna; Inland Waters and Social Surroundings. The ESD was approved by the EPA in June 2019. • A Draft Environmental Review Document (ERD) was submitted to the EPA on 31 October 2019. The ERD provides assessment of the potential impacts of this Proposal on the key environmental factors to enable the EPA to determine the environmental acceptability of this Proposal. • Following multiple reviews of the Draft ERD by regulators, the ERD was released for a two-week public review period from 13-27 May 2020. The proponent is currently preparing responses to the submissions received during the public review period. Infrastructure • Access to the 36W-50W deposits will be via an access road from the existing Paraburdoo mine. • A crusher and conveyor will be built at the Greater Western Range operations, linking to the existing Paraburdoo mine processing plant. The Paraburdoo mine product stockpiles, rail and train load- out system will be utilised. • Ore will be railed to Rio Tinto ports at Dampier and Cape Lambert. The existing port and railway networks have sufficient capacity to accommodate ore supply from the Western Range 36W-50W deposit. • Support facilities located at the Greater Western Range operations will include fixed plant workshop, bulk fuel storage and refuelling facilities, and bulk lube storage. • Existing support facilities at the Paraburdoo mine will be utilised including heavy and light vehicle workshops, explosive facility, and waste fines storage facility. • Electric power will be supplied to the Greater Western Range operations via a 33 kV connection to the Rio Tinto transmission network at Paraburdoo. • Water for the Greater Western Range construction and operations will be sourced from bores at Western Range, supplemented by a connection to Paraburdoo borefields. • Residential and Fly In, Fly Out operations personnel will be accommodated in the Paraburdoo town, and utilise the Paraburdoo airport. Costs • Operating costs were benchmarked against similar operating Rio Tinto Iron Ore mine sites. • The capital costs for Western Range 36W-50W are based on the Pre-Feasibility Study, utilising experience from the construction of similar Rio Tinto Iron Ore projects in the Pilbara, Western Australia. • Exchange rates were forecast by analysing and forecasting macro-economic trends in the Australian and World economy. • Transportation costs were based on existing operating experience at Rio Tinto Iron Ore mine sites in the Pilbara, Western Australia. • Allowances have been made for royalties to the Western Australian government and other private stakeholders. Revenue factors • Rio Tinto applies a common process to the generation of commodity prices across the group. This involves generation of long-term price curves based on current sales contracts, industry capacity analysis, global commodity consumption and economic growth trends. In this process, a price curve, rather than a single price point, is used to develop estimates of mine returns over the life of the project. The detail of this process and of the price point curves is commercially sensitive and is not disclosed. Market assessment • Rio Tinto Iron Ore plans to blend ore from Western Range 36W-50W deposit with ore from other Rio Tinto Iron Ore mine sites to make a saleable ore product. Western Range 36W-50W ore will not be marketed directly. This plan is in line with current Rio Tinto Iron Ore practices where ore from
Appendix 3 13 multiple mines is combined to produce the Pilbara Blend product. • Blending of iron ore from Brockman and Marra Mamba sources results in achieving Pilbara Blend Fe requirement, whilst reducing both the average values, and variability, of SiO2, Al2O3, and P. This product attracts a market premium and accounts for annual sales in excess of 250 Mt/a. • The supply and demand situation for iron ore is affected by a wide range of factors. As iron and steel consumption changes with economic development and circumstances, Rio Tinto Iron Ore delivers products aligned with its Mineral Resources and Ore Reserves. These products have changed over time and successfully competed with iron ore products supplied by other companies. Economic • Economic inputs such as foreign exchange rates, carbon pricing, and inflation rates are also generated internally at Rio Tinto. The detail of this process is commercially sensitive and is not disclosed. • Sensitivity testing of the Western Range 36W-50W Brockman Ore Reserves using both Rio Tinto long-term prices and a range of published benchmark prices demonstrates a positive net present value for the project sufficient to meet Rio Tinto Limited investment criteria. Social • The Western Range 36W-50W deposit is located on Mining Lease AM70/00246 (ML246SA), granted pursuant to the Paraburdoo State Agreement. • Discussions about a Joint Venture covering the Western Range mining hub with China Baowu Group are continuing. • The Western Range 36W-50W deposit falls within the area of the Yinhawangka Native Title determination. • Extensive archaeological and ethnographic surveys have been undertaken over the majority of the Greater Paraburdoo area. Surveys are ongoing and will continue into 2021. These have been undertaken with full participation and involvement of the Yinhawangka People. • Adjustments to the proposed pit design Western Range 36W-50W were completed to reflect feedback provided by the Yinhawangka people in relation to specific sites of very high heritage significance. Groundwater abstraction and quality will continue to be managed in accordance with the existing Greater Paraburdoo Groundwater Licences and associated Groundwater Operating Strategy, and any amendments as required. • The Western Range 36W-50W deposit is located within the Shire of Ashburton. Rio Tinto Iron Ore has established an ongoing engagement with the Shire of Ashburton, which includes scheduled meetings and project updates. Other • Semi-quantitative risk assessments have been undertaken throughout the Western Range study phases. No material naturally-occurring risks have been identified through this process. • Discussions about a Joint Venture covering Western Ranges mining hub with China Baowu Group are continuing. Classification • The Ore Reserves for Western Range 36W-50W consist of 67% Proved Reserves and 33% Probable (no Probable is derived from Measured Resource) Reserves. • The Competent Person is satisfied that the stated Ore Reserve classification reflects the outcome of technical and economic studies. Audits or reviews • Rio Tinto Group Internal Audit engages SRK Consulting to complete an audit on 36W-50W in 2020, including all aspects of data, interpretation, estimation, and mine planning with the result being satisfactory. No material findings were identified. • Rio Tinto Iron Ore peer review processes and internal Rio Tinto technical reviews have been completed. These reviews concluded that the fundamental data collection techniques are appropriate. Discussion of relative accuracy/ confidence • Rio Tinto Iron Ore operates multiple mines in the Pilbara region of Western Australia. The Ore Reserve estimation techniques utilised for the Western Range 36W-50W Brockman deposit are consistent with those applied at the existing operations. Reconciliation of actual production with the Ore Reserve estimate for individual deposits is generally within 10% for tonnes on an annual basis. This result is indicative of a robust Ore Reserve estimation process. • For the Western Range 36W-50W, accuracy and confidence of modifying factors are generally consistent with the current level of study (Pre-Feasibility Study).
Notice to ASX Page 1 of 13 Increase in Mineral Resource at Kennecott Copper operation following mine life extension studies 17 February 2021 Rio Tinto today announces significant additional Measured, Indicated and Inferred Mineral Resources at the Kennecott Copper operation. These Mineral Resources are contained within the Bingham Canyon copper, gold, and molybdenum porphyry deposit and would be mined by a northernly expansion of the open pit located 41 km southwest of Salt Lake City, Utah (Figure 1). These changes will be included in Rio Tinto’s 2020 Annual Report, to be released to the market by 22 February 2021, and are reportable changes compared to those published in the 2019 Annual Report. Mineral Resources are quoted in this release on a 100 percent basis. Rio Tinto’s Ore Reserves and Mineral Resources as at 31 December 2020, and Rio Tinto’s interests, are set out in full in its 2020 Annual Report. Mineral Resources are reported in addition to Ore Reserves. Total Mineral Resource increase reported at an economic margin is 243 Mt at 0.55% copper equivalent (CuEq), an increase of 577%. The additional Mineral Resources potentially add about four years of mine life to the Bingham Canyon open pit if converted to Ore Reserves through additional study. As announced in 2019, work is currently underway to extend production at Kennecott to 2032. Study work to date supports the expansion of the open pit primarily to the north with no additional deepening of the pit bottom and processing to refined copper, gold, silver and molybdenum concentrates by utilising current Rio Tinto Kennecott (RTK) integrated facilities. Pre-feasibility studies, including infill drilling, continue to refine the mineralisation, geology, structure, geotechnical and metallurgical models of this area of the pit (Figures 2 and 3). These additional Mineral Resources can be mined under existing agreements and approvals. Stripping activities are targeted to begin in three to four years and first production prior to reserves depletion. Bingham Canyon open pit Mineral Resource additions: A full tabulation of the changes in Mineral Resource from 2019 to 2020 is provided in Table A, including the additions of Measured, Indicated and Inferred Mineral Resource based on Order of Magnitude (OoM) study open pit phase designs and optimised economic cut-off grade constrained within the resource shell. Results reported herein have been prepared in accordance with the reporting requirements set out in the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (the JORC Code). Details of data collection and resource estimation techniques are provided in Appendix A to this release in accordance with the Table 1 checklist in the JORC Code and located at riotinto.com/financial-news-performance/resources-and-reserves. EXHIBIT 99.10
Page 2 of 13 Table A: Mineral Resource changes for Bingham Canyon Open Pit Measured Resources Mt CuEq (%) Cu (%) Au (g/t) Mo (%) Ag (g/t) Resources at 31 December 2019 14 0.63 0.46 0.13 0.031 1.90 Additions 114 0.66 0.46 0.25 0.018 2.15 Resources at 31 December 2020 128 0.65 0.46 0.24 0.020 2.12 Indicated Resources Mt CuEq (%) Cu (%) Au (g/t) Mo (%) Ag (g/t) Resources at 31 December 2019 18 0.58 0.44 0.15 0.017 2.21 Additions 124 0.46 0.31 0.16 0.016 1.38 Resources at 31 December 2020 142 0.46 0.33 0.16 0.016 1.48 Inferred Resources Mt CuEq (%) Cu (%) Au (g/t) Mo (%) Ag (g/t) Resources at 31 December 2019 11 0.36 0.22 0.24 0.003 2.18 Additions 5 0.38 0.29 0.14 0.002 1.12 Depletions 1 0.18 0.13 0.07 0.002 1.25 Resources at 31 December 2020 15 0.37 0.25 0.21 0.003 1.86 Total Resources Mt CuEq (%) Cu (%) Au (g/t) Mo (%) Ag (g/t) Resources at 31 December 2019 42 0.54 0.39 0.17 0.018 2.10 Additions 244 0.55 0.38 0.20 0.017 1.73 Depletions 1 0.18 0.13 0.07 0.002 1.25 Resources at 31 December 2020 285 0.54 0.38 0.20 0.017 1.79 Footnotes: The Mineral Resource additions for 2020 are constrained within OoM open pit expansion phase designs and have been tabulated based on production schedules using optimised varying economic margin cut-off grades which averaged approximately equal to a 0.25 CuEq% as further explained in Appendix A. Depletions are due to 2020 mining of Inferred Resource within the Bingham Canyon Ore Reserve pit. Copper equivalent is determined using Rio Tinto forward-looking pricing and metallurgical recovery assumptions summarised in Appendix A. Geology, drilling techniques, and geological interpretation Figure 1 shows the location of the Bingham Canyon Mine. Figure 2 shows a plan with the location of all drill holes used in the resource evaluation and those contained in the Mineral Resource pushback volume. Figure 3 provides a representative cross section through the pushback The deposit has been interpreted as a lithologically controlled porphyry copper, gold and molybdenum deposit. Drilling has been carried out over the long history of operation using a combination of diamond and churn drilling methods, with sampling predominantly on a 3 m interval but honouring geological boundaries in the diamond drilled core. This resource addition is based on the Bingham Canyon resource model that utilises assay results captured from a combination of 1,106 diamond drill (DD) holes and 180 churn drill holes completed throughout the history of operation through to the end of 2019 comprising a total of 692,944 m of drilling. Assays within the resource pushback are from 370 diamond drill (DD) holes completed throughout the history of operation to the end of 2019 comprising a total of 232,857 m drilling.
3 Sampling, sub-sampling method and sample analysis method Assays have been carried out on half core and split churn samples. Sample lengths vary from 0.6 to 3.6 m, with 3 m being the most common. Assay techniques have varied over time but most recently use a combination of full acid digest with AES/MS finish and fire assay for gold and silver. Estimation Methodology Estimation has been carried out by ordinary kriging for economic elements and density assignments based on rock type and alteration domains. Grades for copper, gold, molybdenite and silver were estimated into parent blocks using Maptek™ Vulcan™ software. Criteria used for classification Classification has been carried out after consideration of understanding of the geological genesis model, assay and drilling quality and confidence in estimation parameters. Classification criteria for Measured, Indicated and Inferred Mineral Resources is based on drillhole spacing of less than 91 m, from 91 to 182 m and greater than 182 m and averages 79 m x 79 m, 133 m x 133 m and 276 m x 276 m, respectively. Cut-off grades and modifying factors Reasonable prospects for eventual economic extraction have been assessed through mining designs based on Order of Magnitude open pit mining phase designs, optimised Life of Mine (LoM) production scheduling using variable economic margin cut-off grades based on performance of historical metallurgical ore types and operating cost projections and cash flow analysis including estimates for development and sustaining capital. Copper equivalents have been calculated using the formula CuEq% = Cu% + (((Au g/t * Au price per gram * Au_recovery) + (Mo% * Mo price per tonne * Mo_recovery) + (Ag g/t * Ag price per gram * Ag_recovery)) / (Cu price per tonne * Cu_recovery). Details of recoveries are shown on an average basis in Appendix A. Competent Persons’ Statement The information in this report that relates to Mineral Resources is based on information compiled under the supervision of Kim Schroeder and Pancho Rodriguez, Competent Persons who are Members of the Australasian Institute of Mining and Metallurgy (MAusIMM). Kim Schroeder and Pancho Rodriguez are full- time employees of Rio Tinto and have sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity to which they are undertaking to qualify as a Competent Person as defined in the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Each of Kim Schroeder and Pancho Rodriguez consents to the inclusion in the report of the matters based on the information that he has prepared in the form and context in which it appears.
4 Figure 1: Rio Tinto Kennecott property and facilities
5 Figure 2: Current pit drill hole intersections including those contained within the new resource Figure 3: Cross section A-A’ through the Bingham Canyon orebody showing the geology, copper and molybdenite mineralisation models. Footnote: Not all of the mineralisation shown is considered to have the potential for economic extraction; only that subset that is considered potentially economic is tabulated as Mineral Resource.
Page 6 of 13 Contacts media.enquiries@riotinto.com riotinto.com Follow @RioTinto on Twitter Media Relations, United Kingdom Illtud Harri M +44 7920 503 600 David Outhwaite T +44 20 7781 1623 M +44 7787 597 493 Media Relations, Americas Matthew Klar T +1 514 608 4429 Media Relations, Asia Grant Donald T +65 6679 9290 M +65 9722 6028 Media Relations, Australia Jonathan Rose T +61 3 9283 3088 M +61 447 028 913 Matt Chambers T +61 3 9283 3087 M +61 433 525 739 Jesse Riseborough T +61 8 6211 6013 M +61 436 653 412 Investor Relations, United Kingdom Menno Sanderse T: +44 20 7781 1517 M: +44 7825 195 178 David Ovington T +44 20 7781 2051 M +44 7920 010 978 Clare Peever M: +44 7788 967 877 Investor Relations, Australia Natalie Worley T +61 3 9283 3063 M +61 409 210 462 Amar Jambaa T +61 3 9283 3627 M +61 472 865 948 Group Company Secretary Steve Allen Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885 Joint Company Secretary Tim Paine Rio Tinto Limited Level 7, 360 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404 This announcement is authorised for release to the market by Rio Tinto’s Group Company Secretary.
1 Appendix A: Bingham Canyon open pit addition to Resource: JORC Table 1 The following table provides a summary of important assessment and reporting criteria used at Bingham Canyon for the reporting of the addition of new Mineral Resources in accordance with the Table 1 checklist in The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition). Criteria in each section apply to all preceding and succeeding sections. SECTION 1 SAMPLING TECHNIQUES AND DATA Criteria Commentary Sampling techniques • Sampling techniques related to Mineral Resource estimation have been either churn or diamond drill core. Since the 1950s, all drilling has been diamond core, either as PQ, NQ, or HQ in size. • Sample intervals can range from 0.3 to 4 m, with 3 m being the standard length. Core is sawn in half with half the core assayed for Cu, Mo, Ag, and Au. The average core sample is 10 kg, which is then split to 1000 grams (g) for pulverization and a 100 g pulp is generated for assay (30 g for fire assay, 5 g for AA). Drilling techniques • Drilling data summary: Diamond Churn Year # Holes meters # Holes meters 1906-1979 246 197,369 180 49,464 1980-1999 233 103,000 2000-2009 356 201,123 2010-2018 464 193,007 2018-2019 87 25,759 Total 1386 720,258 180 49,464 • The deposit is defined by a program of churn drilling (6%) from 1910 to 1953 and diamond core drilling (94%) drilled from 1945 to 2019. Size of diamond core is as follows: AX/BX – 12%, NX/NQ – 28%, HQ – 54%, PQ – 6%. • Since the end of churn drilling by 1980, the drilling methodology has not changed. Drill sample recovery • Since 1980, the interval length and amount of core recovered has been recorded as part of the standard geotechnical data collection. Drilling methodology has been improved to maximize core recovery. Drilling methods have resulted in 90% of the core with greater than 80% core recovery. • The sample recovery methodology has not changed since 2016 when low recovery between drill runs have been assigned to a specific footage, when possible. Logging • Since the 1970s, standardised RTK logging systems have been used for all drilling which includes collection of lithology, alteration, structure, veining and mineralization. • Since 1980, the core has been photographed and geotechnically logged; this represents 74% of cored drilled. • Since 2008, all drillholes permissible for entry of the instrument are logged using an acoustic televiewer for structure data measurements. • The logging methodology has not changed materially since 1980. Sub- sampling techniques and sample preparation • Pre 1980, core was hand split. Since 1980, core has been sawn in half. One half is sent for assay; the other half is stored at RTK. • Samples are sent to a commercial lab for preparation and assay. Samples are crushed to minus 2 mm and a 1000 g sample split is pulverized to generate 4 sample pulps. These pulps
2 Sub- sampling techniques and sample preparation - continued are used for a Au assay, a Cu, MoS2 and Ag assay, and a composite multi-element assay and the fourth is returned to RTK. The sample reject sample material (<2 mm) is returned to RTK. • Sampling procedures have been reviewed and audited by external sampling experts, most recently in 2010 (AMEC) with no material findings. • The sub-sampling methodology has not changed since 1980 when core sawing began. Quality of assay data and laboratory tests • Current QA/QC procedures have been in place since 1990. The acQuire data management database system has be used since 2000. • Duplicate samples of the second half of core are generated for every 40th sample. • Matrix matched pulp standards are inserted every 20th sample. • A sample duplicated for the coarse reject material is assayed every 20th sample. For every 20 coarse reject pulp assays, a matrix matched standard is inserted. • Cu, Mo and Ag are assayed by HNO3-HClO4-HF-HCl digestion and ICP-AES analysis. Au is assayed by fire assay fusion with an AAS finish for one assay-ton. • The assay methodology has not changed since 2015. Prior to 2015, Cu, Mo and Ag detection was by AAS, since 2015 detection for these metals has been by ICP-AES. Gold assaying has been consistent through this period, by 30g FA-AA. • Analysis of the performance of certified standards, duplicates, blanks and third-party check assaying has indicated an acceptable level of accuracy and precision with no significant bias or contamination. Verification of sampling and assaying • For all intercepts above certain thresholds (2% Cu, 0.4%, MoS2, 2.83 g/t Au, 2.83 g/t Ag) an additional sample pulp is generated and assayed from the coarse reject material. • Mineral Resource and Ore Reserves standard operating procedures (SOP) document data handling, processing, storage and validation. • There is no adjustment to drillhole assays. There is a lab ranking for samples assayed by more than one lab and the most appropriate assay is stored as the primary assay. • The sample validation methodology remains unchanged since at least 1994. Location of data points • Since 1998, GPS survey is used to locate drillhole collars. Between 1940 and 1998, traditional survey instruments were used to determine collar locations. A local grid system (Bingham Mine grid) is used throughout the mine. The local grid has a counterclockwise rotation of 31.98 degrees from true north. • Down-hole surveys are currently completed by two to three methods: o Since the 1960s, a single shot or multi shot tool is used to survey all drillholes at 61 metre intervals. o Beginning in 2006, selected holes were also surveyed with a magnetometer accompanying an Acoustic Televiewer (ATV) instrument. Since 2008 most holes are also surveyed by ATV. o Since 1995, a gyro survey tool is used to complete a survey for the entire drillhole length after the drillhole is completed. All surveys are reviewed and generally the gyro method is selected unless the other method(s) indicate that they gyro survey is erroneaous. In the latter case the next most accurate survey method is selected and loaded into the database. • Pit topography is kept updated by local surveys that track daily mining advances. Data spacing and distribution • Drill spacing is approximately 90 m to 100 m. • Assay intervals are composited to 8 m for model estimations.
3 • The data spacing and distribution is deemed sufficient by the Competent Person to establish geological and grade continuity appropriate for the Mineral Resource classification that has been applied. Orientation of data in relation to geological structure • Both vertical and angled drilling are used to delineate mineralization. Porphyry mineralisation is disseminated and does not display a strong preferred orientation or structural control. • Drillhole orientations are designed to best delineate mineralisation, though collar placement is dependent on mine accessibility and must be oriented accordingly. Sample security • Laboratory samples are cut and placed onto crates or pallets and transported by locked trucks to a commercial lab for sample preparation and assay. o A Bolt Seal Chain of Custody form is filled out on-site and includes date, bolt seal number, driver, and any relief drivers. A copy of the Bill of Lading (BOL) and chain of custody form are made and sent with the driver. o Upon receipt of cargo, the lab manager will confirm the date and time received, whether the bolt seal was unbroken, and bolt seal number. The lab receiver signs the Chain of Custody and emails a copy to RTK. • Individual samples are weighed before shipment and by the receiving commercial lab. Sample weights are cross checked and verified by RTK. • Retention of the one half of core and assay pulps are retained in a secure core warehouse in Salt Lake City, Utah Audits or reviews • The following reviews have been completed on sampling. o Rio Tinto Corporate Assurance Internal Audit of Resources and Reserves (2015) o Review on the Copper Reconciliation Process at Bingham Canyon Mine (2011) o Sampling procedures have been reviewed and audited by external sampling experts, most recently in 2010 (AMEC). o Review of Sampling, Sample Preparation and the Central Analytical Laboratory (2009) No material findings were made, and these reviews concluded that the fundamental data collection techniques are appropriate. SECTION 2 REPORTING OF EXPLORATION RESULTS Criteria Commentary Mineral tenement and land tenure status • The Bingham Canyon Mine is wholly owned by Rio Tinto Kennecott Copper (RTK’s legal name is Kennecott Utah Copper LLC). • RTK has the authority to mine the mineral resources and ore reserves identified in this document under existing agreements. RTK also acquired a number of mineral leases and unpatented lode mining claims located in Tooele, Salt Lake and Utah Counties from Kennecott Exploration Company in 2020. Exploration done by other parties • Various companies since 1870 have worked around the core of the RTK holdings. As properties were acquired, exploration information was obtained and incorporated into the ore body knowledge. • Since 2009, Rio Tinto Exploration has performed brownfield exploration near the deposit. Geology • The Bingham Canyon deposit is a classic porphyry copper deposit containing economic values of copper, molybdenum, gold, silver, and historic lead and zinc production. Peripheral
4 copper-gold skarns, lead-zinc fissures, and disseminated gold deposits are also associated with this copper porphyry system. The most recent publication devoted to this deposit is contained in the Society of Economic Geologist, Inc, 2012, Special Publ. # 16, pp. 127-146. The deposit has been extensively studied both economically and academically over the past 100 years and is considered as a deposit that defines copper porphyry systems. Drillhole Information • Exploration results have not been reported separately; therefore, this criteria category is not applicable. Data aggregation methods • Exploration results have not been reported separately; therefore, this criteria category is not applicable. Relationship between mineralisation, widths and intercept lengths • Down-hole intercepts are reported as true width due to disseminated mineralisation that has no preferred orientation. Diagrams • RTK location, facilities and property boundaries are shown in Figure 1 in the body of this Notice to ASX. • Plan map of drill hole collars intersecting the current pit are shown in Figure 2 in the body of this Notice to ASX. • Geology and mineralization is shown on a cross section in Figure 3 in the body of this Notice to ASX. Balanced reporting • Exploration results have not been reported separately; therefore, this criteria category is not applicable. Other substantive exploration data • Not applicable. Further work • Studies continue to evaluate the potential to mine the extensive porphyry and skarn mineralisation beyond currently reported Mineral Resource and Ore Reserve ultimate pit. SECTION 3 ESTIMATION AND REPORTING OF MINERAL RESOURCES Criteria Commentary Database integrity • All drilling data is securely stored in acQuire™, a geoscientific information management system managed by a dedicated team within RTK. The system is backed up daily. • Estimation data is digitally compared to the data extracted for the previous model to check data integrity. • All collar, survey, assay and geology data loaded to the database are manually verified against original documents. Validation is documented with signoff documents and included as part of the annual Mineral Resource model documentation. • The database access is controlled and managed by the Geology department. • The database includes data validation for text-based and numeric fields. Site visits • Mineral Resource Competent Persons are located on site. Geological interpretation • There is high confidence in the geologic interpretation. Past mining has created over 1.3 km of vertical geologic exposures. Geologic mapping has been collected since 1926. • Drilling and pit mapping is used to build the geologic model.
5 • Grade estimation is controlled by domains defined based on geology, alteration and structure. Dimensions • The deposit is contained within a 4.5 km x 4.5 km area with a maximum thickness of 900 m and average overburden cover of 800 m. Estimation and modelling techniques • For variography estimation domains of grade zone, limb zones (mineralisation trends) and rock type are recombined as necessary to provide spatial continuity analyses; the typical approach is to recombine grade zones and limb zones, leaving rock type as the consistent limiting variable. Domain boundaries are treated as soft, meaning that composites from adjacent grade zones can be used in estimation. • Copper, molybdenite, gold and silver are estimated by a pass of ordinary kriging (OK) followed by a “fill-in” pass of simple kriging (SK) that uses a localised, declustered mean. Blocks that are not estimated after this secondary pass are populated with the mean estimated (from pass 1 and 2) for that domain. • Search ellipses were determined by calculating the range at specified percentages of the variogram sill and using the orientation of the anisotropic ellipse. For the OK pass, 95% of the sill is used. An SK pass is used at the range of the sill, beyond which any estimation will be using uncorrelated data and hence is assigned the average estimated grade. • The data had been composited to 8 m for Mineral Resource estimation to reduce grade variability and reflect the massive style of mineralization. • Outlier analysis was completed on the grade zone/rock type breakdown to determine the most appropriate (spatially and statistically) thresholds. Outliers are preferentially controlled by a “High Yield Restriction” ellipse. The range at 60% of the sill is used for high-grade restriction, beyond which a sample cannot be used for a block’s estimation. • The estimate uses boundary analysis contact plots to create a contact matrix and assignment of a variography grouping. • Estimation is into parent blocks of 15 mE × 15 mN × 15 mRL • Blastholes are also used to define the four grade zones for each metal but not for estimation. • Talc, arsenic, clay, bismuth, sulphur are also estimated for mine planning purposes. • For Mo, resource model grades are factored based on historical reconciliations between exploration assays and mill sample assays. These relationships were updated in 2020. The following validation was carried out on the 2020 resource model and showed that the model validates well against the input data and historical production: • All spatial and geostatistical validation is performed against a declustered model (nearest neighbour estimation) and includes; o Swath plot analysis to check for trends in data/estimates and evaluate smoothing o Histogram comparison to check on variance of data versus estimation (smoothing) o Cumulative frequency comparison to evaluate smoothness of the model, variance, and bias o Grade-tonnage curves to assess metal-at-risk • QQ plots to evaluate bias in models versus the declustered database
6 Estimation and modelling techniques - continued • Validation is focused on 4 separate volumes: o Reserve pit shell. o A “proxy” slice volume; an ore volume designed to mimic the present pushbacks but within historic mining to provide a contextual as- mined/backwards-looking comparison. To be evaluated against BBA to establish predictive capability. o Monthly reconciliation polygons, processed from actual mining. These values are compared against monthly concentrator reporting to evaluate the accuracy of the models within ore shapes. New resoure pit shell. Moisture • All Mineral Resource tonnages are estimated and reported on a dry basis. Cut-off parameters • Optimised Life of Mine production scheduling of phased mining designs using variable economic marginal cut-off grades based on performance of historical metallurgical ore types, product metals, operating cost projections and metal prices which averaged approximately equal to a 0.25 CuEq%. • Metal prices used are provided by Rio Tinto Economics and are generated based on industry capacity analysis, global commodity consumption and economic growth trends. A single long term price point is used in the definition of ore and waste and in the financial evaluations underpinning the resources statement. The detail of this process and of the price points selected are commercially sensitive and are not disclosed. • Operating costs are informed by current operations. • It is the company’s opinion that all the elements included in the metal equivalent calculation have a reasonable potential to be recovered by RTK’s milling, smelting and refining facilities and sold. • Average grades for the individual metals included in the metal equivalent calculation are shown in the Mineral Resource tabulations. • Copper equivalents have been calculated using the formula CuEq% = Cu% + (((Au g/t * Au price per gram * Au_recovery) + (Mo% * Mo price per tonne * Mo_recovery) + (Ag g/t * Ag price per gram * Ag_recovery)) / (Cu price per tonne * Cu_recovery). Mining factors or assumptions • The estimate assumes the continuation of open pit mining using the existing mining fleet • Reasonable prospects for eventual economic extraction have been assessed through mining designs based on Order of Magnitude open pit mining phase designs, optimised Life of Mine (LoM) production scheduling using variable economic marginal cut-off grades based on performance of historical metallurgical ore types and operating cost projections and cash flow analysis including estimates for development and sustaining capital. • Based on historical performance, no recovery and dilution factors are applied in the estimation. Metallurgical factors or assumptions • The metallurgical processes have been developed and optimized based on the long operating history of the deposit. • All process performance parameters (recoveries, concentrate grades including deleterious elements) are based on historical metallurgical test performance of 44 ore types.
7 • Several decades of mineralogy characterisation work concludes that the deposit continues to be of a similar nature to the exisiting operation. • Average metallurgical recoveries for the resource additions used to calculate CuEq%: %Cu %Au %Mo %Ag 89 70 71 74 Environmental factors or assumptions • The Bingham mine is an historical operation managed under Utah regulatory approval. All approvals and permits necessary to mine the Mineral Resources have been obtained and are expected to be maintained. Bulk density • Specific gravity/bulk density is determined by using the displacement method using sealed core, volumetric of dry core samples, and gridded rock sampling across the pit. • Yearly mining reconciliation show calculated tonnage from volume surveys to be within 5% of mine production. • The density estimates were updated in 2020. Classification • Mineral Resources are classified after consideration of understanding of the geological genesis model, assay and drilling quality and confidence in estimation parameters. Classification criteria based on drill spacing is: o Measured – Spacing less than 91 m between composites. o Indicated – Spacing between 91 m and 182 m. o Inferred – Spacing greater than 182 m between composites. • There is less confidence in the high grade molybdenum zone because of drill spacing and size of the zone. Accordingly, blocks meeting the Measured classification criteria are classified as Indicated Mineral Resources. • The Competent Persons are satisfied that the stated Mineral Resource classification reflects the relevant factors of the deposit. Audits or reviews • Mineral Resource audits/reviews that have been complete in the past seven years. • Fundamental Data – Extraction and Quality review of the resource database (2017) • Long Range Model (Resource model) Cu EDA (2017) • Rio Tinto Corporate Assurance Internal Audit of Resources and Reserves (2015 ) • Copper Group Peer Review (2015) • Rio Tinto TEG/BED review of RTK’s Integrated Studies IC requests for the South Pushback (2014 & 2015) • Review of the Mineral Resource and Ore Reserve procedures (2013) • External review of molybdenum grade adjustments (2014) • No material issues were raised in the reviews. Discussion of relative accuracy/ confidence • Bingham Canyon open pit mine has been in operation since 1906. The Mineral Resource data collection and estimation techniques used are supported by reconciliation of actual production since 1989. • Reconciliation of actual production with the Mineral Resource estimates for the existing operational are generally within 10% for tonnage and grades.
Rules 4.7.3 and 4.10.3 ASX Listing Rules Appendix 4G (current at 17/7/2020) Page 1 Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations Name of entity Rio Tinto Limited ABN/ARBN Financial year ended: 004 458 404 31 December 2020 Our corporate governance statement1 for the period above can be found at:2 ☒ These pages of our 2020 Annual Report:113 - 195 ☒ This URL on our website: https://www.riotinto.com/invest/corporate-governance The Corporate Governance Statement is accurate and up to date as at 22 February 2021 and has been approved by the board. The annexure includes a key to where our corporate governance disclosures can be located.3 Date: 22 February 2021 Name of authorised officer authorising lodgement: Tim Paine, Joint Company Secretary 1 “Corporate governance statement” is defined in Listing Rule 19.12 to mean the statement referred to in Listing Rule 4.10.3 which discloses the extent to which an entity has followed the recommendations set by the ASX Corporate Governance Council during a particular reporting period. Listing Rule 4.10.3 requires an entity that is included in the official list as an ASX Listing to include in its annual report either a corporate governance statement that meets the requirements of that rule or the URL of the page on its website where such a statement is located. The corporate governance statement must disclose the extent to which the entity has followed the recommendations set by the ASX Corporate Governance Council during the reporting period. If the entity has not followed a recommendation for any part of the reporting period, its corporate governance statement must separately identify that recommendation and the period during which it was not followed and state its reasons for not following the recommendation and what (if any) alternative governance practices it adopted in lieu of the recommendation during that period. Under Listing Rule 4.7.4, if an entity chooses to include its corporate governance statement on its website rather than in its annual report, it must lodge a copy of the corporate governance statement with ASX at the same time as it lodges its annual report with ASX. The corporate governance statement must be current as at the effective date specified in that statement for the purposes of Listing Rule 4.10.3. Under Listing Rule 4.7.3, an entity must also lodge with ASX a completed Appendix 4G at the same time as it lodges its annual report with ASX. The Appendix 4G serves a dual purpose. It acts as a key designed to assist readers to locate the governance disclosures made by a listed entity under Listing Rule 4.10.3 and under the ASX Corporate Governance Council’s recommendations. It also acts as a verification tool for listed entities to confirm that they have met the disclosure requirements of Listing Rule 4.10.3. The Appendix 4G is not a substitute for, and is not to be confused with, the entity's corporate governance statement. They serve different purposes and an entity must produce each of them separately. 2 Tick whichever option is correct and then complete the page number(s) of the annual report, or the URL of the web page, where your corporate governance statement can be found. You can, if you wish, delete the option which is not applicable. 3 Throughout this form, where you are given two or more options to select, you can, if you wish, delete any option which is not applicable and just retain the option that is applicable. If you select an option that includes “OR” at the end of the selection and you delete the other options, you can also, if you wish, delete the “OR” at the end of the selection. See notes 4 and 5 below for further instructions on how to complete this form.
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations ASX Listing Rules Appendix 4G (current at 17/7/2020) Page 2 ANNEXURE – KEY TO CORPORATE GOVERNANCE DISCLOSURES Corporate Governance Council recommendation Where a box below is ticked,4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement: 1.1 A listed entity should have and disclose a board charter setting out: (a) the respective roles and responsibilities of its board and management; and (b) those matters expressly reserved to the board and those delegated to management. ☒ and we have disclosed a copy of our board charter at: https://www.riotinto.com/invest/corporate-governance 1.2 A listed entity should: (a) undertake appropriate checks before appointing a director or senior executive or putting someone forward for election as a director; and (b) provide security holders with all material information in its possession relevant to a decision on whether or not to elect or re-elect a director. ☒ 1.3 A listed entity should have a written agreement with each director and senior executive setting out the terms of their appointment. ☒ 1.4 The company secretary of a listed entity should be accountable directly to the board, through the chair, on all matters to do with the proper functioning of the board. ☒ 4 Tick the box in this column only if you have followed the relevant recommendation in full for the whole of the period above. Where the recommendation has a disclosure obligation attached, you must insert the location where that disclosure has been made, where indicated by the line with “insert location” underneath. If the disclosure in question has been made in your corporate governance statement, you need only insert “our corporate governance statement”. If the disclosure has been made in your annual report, you should insert the page number(s) of your annual report (eg “pages 10-12 of our annual report”). If the disclosure has been made on your website, you should insert the URL of the web page where the disclosure has been made or can be accessed (eg “www.entityname.com.au/corporate governance/charters/”).
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations ASX Listing Rules Appendix 4G (current at 17/7/2020) Page 3 Corporate Governance Council recommendation Where a box below is ticked,4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement: 1.5 A listed entity should: (a) have and disclose a diversity policy; (b) through its board or a committee of the board set measurable objectives for achieving gender diversity in the composition of its board, senior executives and workforce generally; and (c) disclose in relation to each reporting period: (1) the measurable objectives set for that period to achieve gender diversity; (2) the entity’s progress towards achieving those objectives; and (3) either: (A) the respective proportions of men and women on the board, in senior executive positions and across the whole workforce (including how the entity has defined “senior executive” for these purposes); or (B) if the entity is a “relevant employer” under the Workplace Gender Equality Act, the entity’s most recent “Gender Equality Indicators”, as defined in and published under that Act. If the entity was in the S&P / ASX 300 Index at the commencement of the reporting period, the measurable objective for achieving gender diversity in the composition of its board should be to have not less than 30% of its directors of each gender within a specified period. ☒ and we have disclosed a copy of our diversity policy at: https://www.riotinto.com/invest/corporate-governance and we have disclosed the information referred to in paragraph (c), on pages 67, 76, 129 – 130 and 193 – 195 of our 2020 Annual Report. 1.6 A listed entity should: (a) have and disclose a process for periodically evaluating the performance of the board, its committees and individual directors; and (b) disclose for each reporting period whether a performance evaluation has been undertaken in accordance with that process during or in respect of that period. ☒ and we have disclosed the evaluation process referred to in paragraph (a) and whether a performance evaluation was undertaken for the reporting period in accordance with that process on pages 126, 135, 138 and 193 – 195 of our 2020 Annual Report. 1.7 A listed entity should: (a) have and disclose a process for evaluating the performance of its senior executives at least once every reporting period; and (b) disclose for each reporting period whether a performance evaluation has been undertaken in accordance with that process during or in respect of that period. ☒ and we have disclosed the evaluation process referred to in paragraph (a) and whether a performance evaluation was undertaken for the reporting period in accordance with that process in the Remuneration Report on pages 140 – 185 and 193 – 195 of our 2020 Annual Report.
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations ASX Listing Rules Appendix 4G (current at 17/7/2020) Page 4 Corporate Governance Council recommendation Where a box below is ticked,4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement: 2.1 The board of a listed entity should: (a) have a nomination committee which: (1) has at least three members, a majority of whom are independent directors; and (2) is chaired by an independent director, and disclose: (3) the charter of the committee; (4) the members of the committee; and (5) as at the end of each reporting period, the number of times the committee met throughout the period and the individual attendances of the members at those meetings; or (b) if it does not have a nomination committee, disclose that fact and the processes it employs to address board succession issues and to ensure that the board has the appropriate balance of skills, knowledge, experience, independence and diversity to enable it to discharge its duties and responsibilities effectively. ☒ and we have disclosed a copy of the charter of the committee at: https://www.riotinto.com/invest/corporate-governance and the information referred to in paragraphs (4) and (5) on pages 128 – 130, 127 and 193 – 195 of our 2020 Annual Report. 2.2 A listed entity should have and disclose a board skills matrix setting out the mix of skills that the board currently has or is looking to achieve in its membership. ☒ and we have disclosed our board skills matrix on pages 130 and 193 – 195 of our 2020 Annual Report. 2.3 A listed entity should disclose: (a) the names of the directors considered by the board to be independent directors; (b) if a director has an interest, position, affiliation or relationship of the type described in Box 2.3 but the board is of the opinion that it does not compromise the independence of the director, the nature of the interest, position or relationship in question and an explanation of why the board is of that opinion; and (c) the length of service of each director. ☒ and we have disclosed the names of the directors considered by the board to be independent directors, and, where applicable, the information referred to in paragraph (b), and the length of service of each director on pages 194, 116-117, 130 and 193 - 195 of our 2020 Annual Report. 2.4 A majority of the board of a listed entity should be independent directors. ☒ 2.5 The chair of the board of a listed entity should be an independent director and, in particular, should not be the same person as the CEO of the entity. ☒ 2.6 A listed entity should have a program for inducting new directors and for periodically reviewing whether there is a need for existing directors to undertake professional development to maintain the skills and knowledge needed to perform their role as directors effectively. ☒
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations ASX Listing Rules Appendix 4G (current at 17/7/2020) Page 5 Corporate Governance Council recommendation Where a box below is ticked,4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement: 3.1 A listed entity should articulate and disclose its values. ☒ and we have disclosed our values on pages 10 -11, 17 and 193 – 195 of our 2020 Annual Report and at https://www.riotinto.com/invest/corporate-governance 3.2 A listed entity should: (a) have and disclose a code of conduct for its directors, senior executives and employees; and (b) ensure that the board or a committee of the board is informed of any material breaches of that code. ☒ and we have disclosed our code of conduct on pages 193 - 195 of our 2020 Annual Report and at: https://www.riotinto.com/invest/corporate-governance 3.3 A listed entity should: (a) have and disclose a whistleblower policy; and (b) ensure that the board or a committee of the board is informed of any material incidents reported under that policy. ☒ and we have disclosed our whistleblower policy on pages 87, 135 and 193 - 195 of our 2020 Annual Report and at: https://www.riotinto.com/invest/corporate-governance 3.4 A listed entity should: (a) have and disclose an anti-bribery and corruption policy; and (b) ensure that the board or committee of the board is informed of any material breaches of that policy. ☒ and we have disclosed our anti-bribery and corruption policy on pages 87, 135 and 193 - 195 of our 2020 Annual Report and at: https://www.riotinto.com/invest/corporate-governance 4.1 The board of a listed entity should: (a) have an audit committee which: (1) has at least three members, all of whom are non-executive directors and a majority of whom are independent directors; and (2) is chaired by an independent director, who is not the chair of the board, and disclose: (3) the charter of the committee; (4) the relevant qualifications and experience of the members of the committee; and (5) in relation to each reporting period, the number of times the committee met throughout the period and the individual attendances of the members at those meetings; or (b) if it does not have an audit committee, disclose that fact and the processes it employs that independently verify and safeguard the integrity of its corporate reporting, including the processes for the appointment and removal of the external auditor and the rotation of the audit engagement partner. ☒ and we have disclosed a copy of the charter of the committee at: https://www.riotinto.com/invest/corporate-governance and the information referred to in paragraphs (4) and (5) on pages 116 – 117, 127, 131 – 135 and pages 193 – 195 of our 2020 Annual Report.
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations ASX Listing Rules Appendix 4G (current at 17/7/2020) Page 6 Corporate Governance Council recommendation Where a box below is ticked,4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement: 4.2 The board of a listed entity should, before it approves the entity’s financial statements for a financial period, receive from its CEO and CFO a declaration that, in their opinion, the financial records of the entity have been properly maintained and that the financial statements comply with the appropriate accounting standards and give a true and fair view of the financial position and performance of the entity and that the opinion has been formed on the basis of a sound system of risk management and internal control which is operating effectively. ☒ 4.3 A listed entity should disclose its process to verify the integrity of any periodic corporate report it releases to the market that is not audited or reviewed by an external auditor. ☒ 5.1 A listed entity should have and disclose a written policy for complying with its continuous disclosure obligations under listing rule 3.1. ☒ and we have disclosed our continuous disclosure compliance policy at: https://www.riotinto.com/invest/corporate-governance 5.2 A listed entity should ensure that its board receives copies of all material market announcements promptly after they have been made. ☒ 5.3 A listed entity that gives a new and substantive investor or analyst presentation should release a copy of the presentation materials on the ASX Market Announcements Platform ahead of the presentation. ☒ 6.1 A listed entity should provide information about itself and its governance to investors via its website. ☒ and we have disclosed information about us and our governance on our website at: https://www.riotinto.com/invest/corporate-governance 6.2 A listed entity should have an investor relations program that facilitates effective two-way communication with investors. ☒ 6.3 A listed entity should disclose how it facilitates and encourages participation at meetings of security holders. ☒ and we have disclosed how we facilitate and encourage participation at meetings of security holders at https://www.riotinto.com/invest/corporate-governance 6.4 A listed entity should ensure that all substantive resolutions at a meeting of security holders are decided by a poll rather than by a show of hands. ☒ 6.5 A listed entity should give security holders the option to receive communications from, and send communications to, the entity and its security registry electronically. ☒
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations ASX Listing Rules Appendix 4G (current at 17/7/2020) Page 7 Corporate Governance Council recommendation Where a box below is ticked,4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement: 7.1 The board of a listed entity should: (a) have a committee or committees to oversee risk, each of which: (1) has at least three members, a majority of whom are independent directors; and (2) is chaired by an independent director, and disclose: (3) the charter of the committee; (4) the members of the committee; and (5) as at the end of each reporting period, the number of times the committee met throughout the period and the individual attendances of the members at those meetings; or (b) if it does not have a risk committee or committees that satisfy (a) above, disclose that fact and the processes it employs for overseeing the entity’s risk management framework. ☒ the processes we employ for overseeing our risk management framework on pages 193 - 195 of our 2020 Annual Report. 7.2 The board or a committee of the board should: (a) review the entity’s risk management framework at least annually to satisfy itself that it continues to be sound and that the entity is operating with due regard to the risk appetite set by the board; and (b) disclose, in relation to each reporting period, whether such a review has taken place. ☒ and we have disclosed whether a review of the entity’s risk management framework was undertaken during the reporting period on pages 92 – 94, 132, 134 – 135 and 193 – 195 of our 2020 Annual Report. 7.3 A listed entity should disclose: (a) if it has an internal audit function, how the function is structured and what role it performs; or (b) if it does not have an internal audit function, that fact and the processes it employs for evaluating and continually improving the effectiveness of its governance, risk management and internal control processes. ☒ and we have disclosed how our internal audit function is structured and what role it performs on pages 135 and 193 – 195 of our 2020 Annual Report 7.4 A listed entity should disclose whether it has any material exposure to environmental or social risks and, if it does, how it manages or intends to manage those risks. ☒ and we have disclosed whether we have any material exposure to environmental and social risks and, if we do, how we manage or intend to manage those risks on pages 62 – 108 and 193 - 195.
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations ASX Listing Rules Appendix 4G (current at 17/7/2020) Page 8 Corporate Governance Council recommendation Where a box below is ticked,4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement: 8.1 The board of a listed entity should: (a) have a remuneration committee which: (1) has at least three members, a majority of whom are independent directors; and (2) is chaired by an independent director, and disclose: (3) the charter of the committee; (4) the members of the committee; and (5) as at the end of each reporting period, the number of times the committee met throughout the period and the individual attendances of the members at those meetings; or (b) if it does not have a remuneration committee, disclose that fact and the processes it employs for setting the level and composition of remuneration for directors and senior executives and ensuring that such remuneration is appropriate and not excessive. ☒ and we have disclosed a copy of the charter of the committee at: https://www.riotinto.com/invest/corporate-governance and the information referred to in paragraphs (4) and (5) 116 – 117, 127, 159 and 193 – 195 of our 2020 Annual Report. 8.2 A listed entity should separately disclose its policies and practices regarding the remuneration of non-executive directors and the remuneration of executive directors and other senior executives. ☒ and we have disclosed separately our remuneration policies and practices regarding the remuneration of non- executive directors and the remuneration of executive directors and other senior executives in our Remuneration Report on pages 140 – 185 and 193 - 195 of our 2020 Annual Report. 8.3 A listed entity which has an equity-based remuneration scheme should: (a) have a policy on whether participants are permitted to enter into transactions (whether through the use of derivatives or otherwise) which limit the economic risk of participating in the scheme; and (b) disclose that policy or a summary of it. ☒ and we have disclosed our policy on this issue or a summary of it on pages 189 and 193 - 195 of our 2020 Annual Report and at https://www.riotinto.com/invest/corporate-governance
EXHIBIT 99.12
Notice to ASX/LSE

Shareholdings of directors and persons discharging managerial responsibility (PDMR) / Key Management Personnel (KMP)
22 February 2021
As part of its dual listed company structure, Rio Tinto notifies dealings in Rio Tinto plc and Rio Tinto Limited securities by PDMRs/KMPs to both the Australian Securities Exchange (ASX) and the London Stock Exchange (LSE).
Rio Tinto Performance Share Plan 2013 ("PSP")
The PSP is a performance based share plan which provides participants with the conditional right (known as a Performance Share Award or PSA) to receive Rio Tinto plc or Rio Tinto Limited shares, subject to performance conditions being met.
The PSA granted in 2016 is subject to two performance conditions. Two thirds of the award is subject to Total Shareholder Return (TSR) performance and the remaining third to an Earnings based measure of Relative EBIT Margin. The TSR part of the award vested on 18 February 2021. The remaining third of the PSA granted in 2016 will vest on 31 May 2021 once the relative EBIT margin performance has been established.
On 18 February 2021, the following PDMRs received their vested PSA in the form of shares, of which sufficient were sold to pay applicable withholding tax and other deductions.
| Security | Name of PDMR/KMP | Conditional Award Granted | TSR Vest Portion | No: of Shares Lapsed | No: of Shares Vested* | No: of Shares Sold | Price per Share | No: of Shares Retained | Date of Transaction | ||||||||||||||||||||
| Rio Tinto plc shares | Baatar, Bold | 17,270 | 11,514 | 0 | 13,840 | 5,744 | GBP 62.61083 | 8,096 | 18/02/2021 | ||||||||||||||||||||
| Rio Tinto plc shares | Barrios, Alfredo | 73,140 | 48,761 | 0 | 58,613 | 31,192 | GBP 62.61083 | 27,421 | 18/02/2021 | ||||||||||||||||||||
| Rio Tinto plc shares | Cunningham, Peter | 13,320 | 8,881 | 0 | 10,675 | 5,009 | GBP 62.61083 | 5,666 | 18/02/2021 | ||||||||||||||||||||
| Rio Tinto Limited shares | Soirat, Arnaud | 20,230 | 13,487 | 0 | 15,960 | 7,527 | AUD 127.40 | 8,433 | 18/02/2021 | ||||||||||||||||||||
| Rio Tinto plc shares | Toth, Peter | 14,808 | 9,873 | 0 | 11,867 | 5,569 | GBP 62.61083 | 6,298 | 18/02/2021 | ||||||||||||||||||||
| Rio Tinto Limited shares | Trott, Simon | 9,412 | 6,275 | 0 | 7,425 | 0 | N/A | 7,425 | 18/02/2021 | ||||||||||||||||||||
| Rio Tinto Limited shares | Vella, Ivan | 3,072 | 2,049 | 0 | 2,424 | 0 | N/A | 2,424 | 18/02/2021 | ||||||||||||||||||||
*The number of shares vested includes additional shares calculated to reflect dividends declared during the vesting period.
Management Share Awards (“MSA”) granted under the Rio Tinto 2018 Equity Incentive Plan
The MSA provides participants with a conditional right to receive Rio Tinto plc or Rio Tinto Limited shares, subject to continuous employment.
On 18 February 2021, the following PDMRs received their vested MSA in the form of shares, of which sufficient were sold to pay applicable withholding tax and other deductions. All MSA included in this announcement were granted prior to the PDMR/KMP becoming a member of the Executive Committee.
| Security | Name of PDMR/KMP | Conditional Award Granted | No: of Shares Vested* | No: of Shares Sold | Price per Share | No: of Shares Retained | Date of Transaction | ||||||||||||||||
| Rio Tinto plc shares | Cunningham, Peter | 3,614 | 4,138 | 1,944 | GBP 62.61083 | 2,194 | 18/02/2021 | ||||||||||||||||
| Rio Tinto plc shares | Toth, Peter | 3,991 | 4,570 | 2,147 | GBP 62.61083 | 2,423 | 18/02/2021 | ||||||||||||||||
| Rio Tinto Limited shares | Vella, Ivan | 3,344 | 3,794 | 0 | N/A | 3,794 | 18/02/2021 | ||||||||||||||||
*The number of shares vested includes additional shares calculated to reflect dividends declared during the vesting period.
FCA notifications in accordance with the EU Market Abuse Regulation have been issued to the London Stock Exchange contemporaneously with this release.
LEI: 213800YOEO5OQ72G2R82
Classification: 3.1. Information disclosed under article 19 of the Market Abuse Regulation.
This announcement is authorised for release to the market by Rio Tinto’s Group Company Secretary.
Steve Allen Group Company Secretary | Tim Paine Joint Company Secretary | ||||
Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885 | Rio Tinto Limited Level 7, 360 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404 | ||||
Page 2 of 2