Rio Tinto PLC 6-K, filed Jun 1, 2021
Rio Tinto PLC (RIO)
6-K
2021-06-01
For: 2021-05-31
View Original
Added on
April 06, 2026
About this 6-K
Rio Tinto PLC filed this 6-K on June 1, 2021.
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, DC 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13A-16 OR 15D-16 OF
THE SECURITIES EXCHANGE ACT OF 1934
Month of May 2021
| Commission file number: 001-10533 | Commission file number: 001-34121 | ||||
| Rio Tinto plc | Rio Tinto Limited | ||||
| ABN 96 004 458 404 | |||||
| (Translation of registrant’s name into English) | (Translation of registrant’s name into English) | ||||
| 6 St. James’s Square | Level 7, 360 Collins Street | ||||
| London, SW1Y 4AD, United Kingdom | Melbourne, Victoria 3000, Australia | ||||
| (Address of principal executive offices) | (Address of principal executive offices) | ||||
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F:
Form 20-F ☒ Form 40-F ☐
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): ☐
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): ☐
Indicate by check mark whether by furnishing the information contained in this Form, the registrant is also thereby furnishing the information to the Commission pursuant to
Rule 12g3-2(b) under the Securities Exchange Act of 1934.
Yes ☐ No ☒
If "Yes" is marked, indicate below the file number assigned to the registrant in connection
with Rule 12g3-2(b): 82- ________
EXHIBIT 99
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrants have duly caused this report to be signed on their behalf by the undersigned, thereunto duly authorised.
| Rio Tinto plc | Rio Tinto Limited | ||||||||||
| (Registrant) | (Registrant) | ||||||||||
| By | /s/ Steve Allen | By | /s/ Steve Allen | ||||||||
| Name | Steve Allen | Name | Steve Allen | ||||||||
| Title | Company Secretary | Title | Joint Company Secretary | ||||||||
| Date | 1 June 2021 | Date | 1 June 2021 | ||||||||
EXHIBIT 99.1
Notice to ASX/LSE

Total voting rights and issued capital
4 May 2021
In accordance with the Financial Conduct Authority’s (FCA) Disclosure Guidance and Transparency Rule 5.6.1R, Rio Tinto plc notifies the market that as of 30 April 2021:
1.Rio Tinto plc’s issued share capital comprised 1,255,773,075 Ordinary shares of 10p each, each with one vote.
2.8,017,197 Ordinary shares of 10p each are held in treasury. These shares are not taken into consideration in relation to the payment of dividends and voting at shareholder meetings.
Accordingly the total number of voting rights in Rio Tinto plc is 1,247,755,878. This figure may be used by shareholders (and others with notification obligations) as the denominator for the calculation by which they will determine if they are required to notify their interest in, or a change to their interest in, Rio Tinto plc under the FCA’s Disclosure Guidance and Transparency Rules.
Note:
As at the date of this announcement:
(a)Rio Tinto plc has also issued one Special Voting Share of 10p and one DLC Dividend Share of 10p in connection with its dual listed companies (‘DLC’) merger with Rio Tinto Limited which was designed to place the shareholders of both companies in substantially the same position as if they held shares in a single enterprise owning all of the assets of both companies;
(b)the Special Voting Share facilitates joint voting by shareholders of Rio Tinto plc and Rio Tinto Limited on joint electorate resolutions; and
(c)there are 371,216,214 publicly held Rio Tinto Limited shares in issue which do not form part of the share capital of Rio Tinto plc.
LEI: 213800YOEO5OQ72G2R82
Classification: 2.5 Total number of voting rights and capital disclosed under article 15 of the Transparency Directive
This announcement is authorised for release to the market by Rio Tinto’s Group Company Secretary.
Steve Allen Group Company Secretary | |||||
Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2058 Registered in England No. 719885 | |||||
EXHIBIT 99.2
Notice to ASX/LSE

Shareholdings of persons discharging managerial responsibility (PDMR) / Key Management Personnel (KMP)
4 May 2021
As part of its dual listed company structure, Rio Tinto notifies dealings in Rio Tinto plc and Rio Tinto Limited securities by PDMR/KMP to both the Australian Securities Exchange (ASX) and the London Stock Exchange (LSE).
UK Share Plan (UKSP)
The UK Share Plan is an HMRC approved Share Incentive Plan under which qualifying UK employees are able to purchase, on a quarterly basis, Rio Tinto plc ordinary shares of 10p each (‘shares’). Shares are purchased out of monthly deductions from salary and participants are allocated an equivalent number of shares free of charge (‘matching shares’). Qualifying UK employees are also awarded Free shares once a year.
Rio Tinto plc shares held in the UKSP are subject to dividend reinvestment whereby cash dividends are used to buy Rio Tinto plc shares in the market.
The following PDMR/KMP were awarded Free shares on 30 April 2021:
| Security | Name of PDMR / KMP | Number of shares awarded | Price per share GBP | ||||||||
| Rio Tinto plc | Baatar, Bold | 58 | 61.56 | ||||||||
| Rio Tinto plc | Cunningham, Peter | 58 | 61.56 | ||||||||
| Rio Tinto plc | Stausholm, Jakob | 58 | 61.56 | ||||||||
| Rio Tinto plc | Toth, Peter | 58 | 61.56 | ||||||||
FCA notifications in accordance with the EU Market Abuse Regulation have been issued to the London Stock Exchange contemporaneously with this release.
LEI: 213800YOEO5OQ72G2R82
Classification: 3.1. Information disclosed under article 19 of the Market Abuse Regulation.
Classification: 3.1. Information disclosed under article 19 of the Market Abuse Regulation.
| Contacts | Please direct all enquiries to media.enquiries@riotinto.com | ||||||||||
Media Relations, UK Illtud Harri M +44 7920 503 600 David Outhwaite M +44 7787 597 493 Media Relations, Americas Matthew Klar T +1 514 608 4429 Investor Relations, UK Menno Sanderse M: +44 7825 195 178 David Ovington M +44 7920 010 978 Clare Peever M +44 7788 967 877 | Media Relations, Australia Jonathan Rose M +61 447 028 913 Matt Chambers M +61 433 525 739 Jesse Riseborough M +61 436 653 412 Investor Relations, Australia Natalie Worley M +61 409 210 462 Amar Jambaa M +61 472 865 948 | ||||||||||
Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885 | Rio Tinto Limited Level 7, 360 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404 | ||||||||||
This announcement is authorised for release to the market by Steve Allen, Rio Tinto’s Group Company Secretary.
Notice to ASX/LSE Page 2 of 2 | ||
Appendix 3Z Final Director’s Interest Notice + See chapter 19 for defined terms. 11/3/2002 Appendix 3Z Page 1 Rule 3.19A.3 Appendix 3Z Final Director’s Interest Notice Information or documents not available now must be given to ASX as soon as available. Information and documents given to ASX become ASX’s property and may be made public. Introduced 30/9/2001. Name of entity Rio Tinto Limited ABN 96 004 458 404 We (the entity) give ASX the following information under listing rule 3.19A.3 and as agent for the director for the purposes of section 205G of the Corporations Act. Name of director Michael Gerard L’Estrange Date of last notice 6 December 2018 Date that director ceased to be director 6 May 2021 Part 1 – Director’s relevant interests in securities of which the director is the registered holder In the case of a trust, this includes interests in the trust made available by the responsible entity of the trust Note: In the case of a company, interests which come within paragraph (i) of the definition of “notifiable interest of a director” should be disclosed in this part. Number & class of securities EXHIBIT 99.3
Appendix 3Z Final Director’s Interest Notice + See chapter 19 for defined terms. Appendix 3Z Page 2 11/3/2002 Part 2 – Director’s relevant interests in securities of which the director is not the registered holder Note: In the case of a company, interests which come within paragraph (ii) of the definition of “notifiable interest of a director” should be disclosed in this part. In the case of a trust, this includes interests in the trust made available by the responsible entity of the trust Name of holder & nature of interest Note: Provide details of the circumstances giving rise to the relevant interest Interest in Rio Tinto Limited Ordinary Shares (Ordinary Shares) held by Bond Street Custodians Pty Limited on behalf of the ‘Macquarie Superannuation and Pension Consolidator’ Superannuation Fund Number & class of securities 3,103 Ordinary Shares. Part 3 – Director’s interests in contracts Detail of contract N/A Nature of interest Name of registered holder (if issued securities) No. and class of securities to which interest relates
Appendix 3D Changes relating to buy-back + See chapter 19 for defined terms. Appendix 3D Page 1 23/04/2013 Rule 3.8A Appendix 3D Changes relating to buy-back (except minimum holding buy-back) Information and documents given to ASX become ASX’s property and may be made public. Introduced 1/9/99. Origin: Appendix 7B. Amended 13/3/2000, 30/9/2001. Name of entity ABN Rio Tinto Limited (RTL) 96 004 458 404 We (the entity) give ASX the following information. 1 Date that an Appendix 3C or the last Appendix 3D was given to ASX 7 May 2020 (Appendix 3D) Information about the change Complete each item for which there has been a change and items 9 and 10. Column 1 (Details announced to market in Appendix 3C or last Appendix 3D) Column 2 (Details of change to buy-back proposals) On-market buy-back 2 Name of broker who will act on the company’s behalf 3 Deleted 30/9/2001. EXHIBIT 99.4
Appendix 3D Changes relating to buy-back + See chapter 19 for defined terms. Appendix 3D Page 2 23/04/2013 Column 1 (Details announced to market in Appendix 3C or last Appendix 3D) Column 2 (Details of change to buy-back proposals) 4 If the company intends to buy back a maximum number of shares - that number Note: This requires a figure to be included, not a percentage. The reference to a maximum number is to the total number including shares already bought back and shares remaining to be bought back. If the total has not changed, the item does not need to be completed. Under the shareholder authority granted at the Annual General Meeting held on 7 May 2020, in the period until (and including) the date of the RTL 2021 Annual General Meeting or 6 May 2021 (whichever is the later), or, if earlier, the date on which shareholders next give approval to buy-backs by RTL of fully paid ordinary shares, the aggregate of the shares bought back under that authority on- market, together with the number of shares bought back under that authority under any off market buy-back tenders will not exceed 55.6 million shares. Under the shareholder authority granted at the Annual General Meeting held on 6 May 2021, in the period until (and including) the date of the RTL 2022 Annual General Meeting or 5 May 2022 (whichever is the later), or, if earlier, the date on which shareholders next give approval to buy-backs by RTL of fully paid ordinary shares, the aggregate of the shares bought back under that authority on- market, together with the number of shares bought back under that authority under any off market buy-back tenders will not exceed 55.6 million shares. 5 If the company intends to buy back a maximum number of shares - the number remaining to be bought back See Item 4. See Item 4. 6 If the company intends to buy-back shares within a period of time - that period of time; if the company intends that the buy-back be of unlimited duration - that intention See Item 4. See Item 4. 7 If the company intends to buy back shares if conditions are met - those conditions
Appendix 3D Changes relating to buy-back + See chapter 19 for defined terms. Appendix 3D Page 3 23/04/2013 All buy-backs 8 Any other change At the 2020 Annual General Meeting held on 7 May 2020, RTL shareholders renewed the authority to buy back shares under off market buy-back tenders (up to the limit described in Item 4). At the 2021 Annual General Meeting held on 6 May 2021, RTL shareholders renewed the authority to buy back shares under off market buy-back tenders (up to the limit described in Item 4). 9 Reason for change To refresh the shareholder authorities previously granted in 2020. For further detail, see the Explanatory Notes lodged with the ASX on 8 March 2021 for the RTL Annual General Meeting held on 6 May 2020. 10 Any other information material to a shareholder’s decision whether to accept the offer (eg, details of any proposed takeover bid) See the Explanatory Notes lodged with the ASX on 8 March 2021 for the RTL Annual General Meeting held on 6 Mary 2021. Compliance statement 1. The company is in compliance with all Corporations Act requirements relevant to this buy-back. 2. There is no information that the listing rules require to be disclosed that has not already been disclosed, or is not contained in, or attached to, this form. Sign here: ........................................................ Date: 6 May 2021 Company Secretary Print name: Tim Paine
EXHIBIT 99.5
Notice to ASX/LSE

Shareholdings of persons discharging managerial responsibility (PDMR) / Key Management Personnel (KMP)
7 May 2021
As part of its dual listed company structure, Rio Tinto notifies dealings in Rio Tinto plc and Rio Tinto Limited securities by PDMR/KMP to both the Australian Securities Exchange (ASX) and the London Stock Exchange (LSE).
On 5 May 2021, the following PDMR/KMP sold shares as follows:
| Security | Name of PDMR/KMP | Number of shares sold | Price per share GBP | ||||||||
Rio Tinto plc | Bold Baatar | 13,000 | 62.92 | ||||||||
Rio Tinto plc | Bold Baatar | 3,500 | 62.88 | ||||||||
FCA notifications in accordance with the EU Market Abuse Regulation have been issued to the London Stock Exchange contemporaneously with this release.
LEI: 213800YOEO5OQ72G2R82
Classification: 3.1. Information disclosed under article 19 of the Market Abuse Regulation.
| Contacts | Please direct all enquiries to media.enquiries@riotinto.com | ||||||||||
Media Relations, UK Illtud Harri M +44 7920 503 600 David Outhwaite M +44 7787 597 493 Media Relations, Americas Matthew Klar T +1 514 608 4429 Investor Relations, UK Menno Sanderse M: +44 7825 195 178 David Ovington M +44 7920 010 978 Clare Peever M +44 7788 967 877 | Media Relations, Australia Jonathan Rose M +61 447 028 913 Matt Chambers M +61 433 525 739 Jesse Riseborough M +61 436 653 412 Investor Relations, Australia Natalie Worley M +61 409 210 462 Amar Jambaa M +61 472 865 948 | ||||||||||
Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885 | Rio Tinto Limited Level 7, 360 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404 | ||||||||||
This announcement is authorised for release to the market by Steve Allen, Rio Tinto’s Group Company Secretary.
Notice to ASX/LSE Page 2 of 2 | ||
Notice to ASX 18 May 2021 Bank of America Global Metals, Mining & Steel Conference Rio Tinto Chief Executive Jakob Stausholm is presenting today at the Bank of America Global Metals, Mining & Steel Conference. The presentation is attached and will also be available at https://riotinto.com/invest/presentations along with details for the webcast and replay. EXHIBIT 99.6
Notice to ASX/LSE Page 2 of 2 Contacts Please direct all enquiries to media.enquiries@riotinto.com Media Relations, UK Illtud Harri M +44 7920 503 600 David Outhwaite M +44 7787 597 493 Media Relations, Americas Matthew Klar T +1 514 608 4429 Investor Relations, UK Menno Sanderse M: +44 7825 195 178 David Ovington M +44 7920 010 978 Clare Peever M +44 7788 967 877 Media Relations, Australia Jonathan Rose M +61 447 028 913 Matt Chambers M +61 433 525 739 Jesse Riseborough M +61 436 653 412 Investor Relations, Australia Natalie Worley M +61 409 210 462 Amar Jambaa M +61 472 865 948 Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885 Rio Tinto Limited Level 7, 360 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404 This announcement is authorised for release to the market by Steve Allen, Rio Tinto’s Group Company Secretary. riotinto.com
Jakob Stausholm Chief Executive Traditional Owners welcome employees at the final day of mining the Argyle underground block cave mine, 3 November 2020 Bank of America Global Metals, Mining & Steel conference 18 May 2021
©2021, Rio Tinto, All Rights Reserved 2 Cautionary and supporting statements This presentation has been prepared by Rio Tinto plc and Rio Tinto Limited (together with their subsidiaries, “Rio Tinto”). By accessing/attending this presentation you acknowledge that you have read and understood the following statement. Forward-looking statements This presentation includes “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. All statements other than statements of historical facts included in this report, including, without limitation, those regarding Rio Tinto’s financial position, business strategy, plans and objectives of management for future operations (including development plans and objectives relating to Rio Tinto’s products, production forecasts and reserve and resource positions), are forward-looking statements. The words “intend”, “aim”, “project”, “anticipate”, “estimate”, “plan”, “believes”, “expects”, “may”, “should”, “will”, “target”, “set to” or similar expressions, commonly identify such forward-looking statements. Such forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Rio Tinto, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such forward-looking statements are based on numerous assumptions regarding Rio Tinto’s present and future business strategies and the environment in which Rio Tinto will operate in the future. Among the important factors that could cause Rio Tinto’s actual results, performance or achievements to differ materially from those in the forward-looking statements include, but are not limited to: an inability to live up to Rio Tinto’s values and any resultant damage to its reputation; the impacts of geopolitics on trade and investment; the impacts of climate change and the transition to a low-carbon future; an inability to successfully execute and/or realise value from acquisitions and divestments; the level of new ore resources, including the results of exploration programmes and/or acquisitions; disruption to strategic partnerships that play a material role in delivering growth, production, cash or market positioning; damage to Rio Tinto’s relationships with communities and governments; an inability to attract and retain requisite skilled people; declines in commodity prices and adverse exchange rate movements; an inability to raise sufficient funds for capital investment; inadequate estimates of ore resources and reserves; delays or overruns of large and complex projects; changes in tax regulation; safety incidents or major hazard events; cyber breaches; physical impacts from climate change; the impacts of water scarcity; natural disasters; an inability to successfully manage the closure, reclamation and rehabilitation of sites; the impacts of civil unrest; the impacts of the Covid-19 pandemic; breaches of Rio Tinto’s policies, standard and procedures, laws or regulations; trade tensions between the world’s major economies; increasing societal and investor expectations, in particular with regard to environmental, social and governance considerations; the impacts of technological advancements; and such other risks identified in Rio Tinto’s most recent Annual Report and accounts in Australia and the United Kingdom and the most recent Annual Report on Form 20-F filed with the United States Securities and Exchange Commission (the “SEC”) or Form 6-Ks furnished to, or filed with, the SEC. Forward-looking statements should, therefore, be construed in light of such risk factors and undue reliance should not be placed on forward-looking statements. These forward-looking statements speak only as of the date of this report. Rio Tinto expressly disclaims any obligation or undertaking (except as required by applicable law, the UK Listing Rules, the Disclosure Guidance and Transparency Rules of the Financial Conduct Authority and the Listing Rules of the Australian Securities Exchange) to release publicly any updates or revisions to any forward-looking statement contained herein to reflect any change in Rio Tinto’s expectations with regard thereto or any change in events, conditions or circumstances on which any such statement is based. Nothing in this presentation should be interpreted to mean that future earnings per share of Rio Tinto plc or Rio Tinto Limited will necessarily match or exceed its historical published earnings per share. Disclaimer Neither this presentation, nor the question and answer session, nor any part thereof, may be recorded, transcribed, distributed, published or reproduced in any form, except as permitted by Rio Tinto. By accessing/ attending this presentation, you agree with the foregoing and, upon request, you will promptly return any records or transcripts at the presentation without retaining any copies. This presentation contains a number of non-IFRS financial measures. Rio Tinto management considers these to be key financial performance indicators of the business and they are defined and/or reconciled in Rio Tinto’s annual results press release, Annual Report and accounts in Australia and the United Kingdom and/or the most recent Annual Report on Form 20-F filed with the SEC or Form 6-Ks furnished to, or filed with, the SEC. Reference to consensus figures are not based on Rio Tinto’s own opinions, estimates or forecasts and are compiled and published without comment from, or endorsement or verification by, Rio Tinto. The consensus figures do not necessarily reflect guidance provided from time to time by Rio Tinto where given in relation to equivalent metrics, which to the extent available can be found on the Rio Tinto website. By referencing consensus figures, Rio Tinto does not imply that it endorses, confirms or expresses a view on the consensus figures. The consensus figures are provided for informational purposes only and are not intended to, nor do they, constitute investment advice or any solicitation to buy, hold or sell securities or other financial instruments. No warranty or representation, either express or implied, is made by Rio Tinto or its affiliates, or their respective directors, officers and employees, in relation to the accuracy, completeness or achievability of the consensus figures and, to the fullest extent permitted by law, no responsibility or liability is accepted by any of those persons in respect of those matters. Rio Tinto assumes no obligation to update, revise or supplement the consensus figures to reflect circumstances existing after the date hereof.
Extraordinary times and significant volatility ©2021, Rio Tinto, All Rights Reserved 3 March 2020 Early 2021
We produce materials essential for a low-carbon future Fe, Cu AI, Fe, Cu, Li Cu, AI, Fe Cu Cu, AI, Fe, Ti, Li, B 4©2021, Rio Tinto, All Rights Reserved
Best operator Expand capability and leadership Impeccable ESG credentials Strengthen track record and transparency Excel in development Deliver organic & inorganic growth Four areas of focus for an even stronger Rio Tinto ©2021, Rio Tinto, All Rights Reserved 5 Social Licence Earn trust by building meaningful relationships and partnerships
Building on our strengths ©2021, Rio Tinto, All Rights Reserved 6 Safety always our priority Empower and develop our people to maximise their contributions Design and deploy Rio system at foundation sites over next 12 months to prove value and build momentum Achieving the highest operational, environmental and social standards from the ground up Results measured as combined impact on safety, engagement, productivity and financial value Best operator Impeccable ESG credentials Excel in Development Social Licence
Working towards impeccable ESG credentials 7 Safety At the heart of our culture 12% lower AIFR1 YoY Fatality-free year Communities & heritage Embed in culture, investing $50m in Indigenous leadership Site-based leadership of relationships with Traditional Owner groups Modernising agreements Establishing Indigenous Advisory Group Inclusion & Diversity Taking more meaningful action 26% women in leadership roles; targeting 2% increase each year 40%2 female board representation Developing Indigenous leaders Social License Climate Well positioned portfolio Strengthened link between executive remuneration & our ESG performance forming 35% of STIP3 Scope 3 goals to guide our partnerships 1All injury frequency rate | 2At 1 January 2021 | 3Short Term Incentive Plan: 20% weighting to safety (unchanged) and 15% to ESG performance ©2021, Rio Tinto, All Rights Reserved Best operator Impeccable ESG credentials Excel in Development c
Creating the portfolio for the next decade and beyond Controlled risk-takers; committed to making rational choices Sharpening our capabilities Important capital project decisions in the next 12 months Ongoing renewal of the portfolio ©2021, Rio Tinto, All Rights Reserved 8 Best operator Impeccable ESG credentials Excel in Development Social Licence Gudai-Darri, Western Australia, April 2021 Oyu Tolgoi underground, Mongolia, 2020
Becoming more outward looking ©2021, Rio Tinto, All Rights Reserved Best operator Impeccable ESG credentials Excel in Development Social Licence Fully participating in the societies where we operate Real engagement with our communities; understanding their felt experience Seeking diverging views Leaving a positive legacy Gove Peninsula Futures Reference Group, 15 March 2021 where the Rirratjingu and Gumatj people presented the Traditional Owners’ vision for the future of Gove 9
Unleashing our full potential 10 • Strong safety record • Great people • Portfolio of world-class assets • Cash generation & capital discipline • Strong balance sheet Strengths • Two years fatality-free • 27% ROCE • $9.4bn Free cash flow • $6.2bn Capital invested • $9.0bn Dividends declared • $8.4bn Taxes & royalties paid 2020 Performance • Operational excellence • Project development • Reputation & rebuild trust • Strengthen external relationships Improve ©2021, Rio Tinto, All Rights Reserved
Appendix Clontarf Cup in Perth, Western Australia, 26 March 2021
12 Our portfolio is well positioned for the low-carbon transition − Over 95% of our revenues are from assets with favourable operational carbon intensities − Around 22% of our revenues and 93% of our growth capital are in the segment with the least low carbon transition risk − 2020 Climate change report includes detailed scenario analysis including specific CO2 prices Lower Scope 3 riskPercentage share of Group: Growth capex* (%)Revenue (%) Carbon in product sold and widely substitutable today Thermal coal, oil and gas Carbon in product sold but hard to substitute today Metallurgical coal No carbon in product sold but CO2 intensive processing today Iron ore fines & lump, bauxite & alumina for coal- based aluminium No carbon in product sold and best-in- class process CO2 intensity today Iron ore DR pellets, bauxite and alumina for hydro-based aluminium, TiO2 No carbon in product sold, low process CO2 intensity and critical enabler of low-carbon future Copper, Aluminium, battery materials Lo w er S co pe 1 & 2 r is k 0% 0% 66% 3% From RTIO, Amrun, Pacific alumina assets 9% 4% From IOC, RTFT, CBG, other 22% 93% From all copper assets, hydro-based aluminium smelters 0% 0% 0% 1% 0% From RBM 2% 0% From coal-based aluminium smelters High transition risks (not in our portfolio) Our portfolio *Excludes sustaining and replacement capex. The 2020 Climate report can be found at riotinto.com ©2021, Rio Tinto, All Rights Reserved Best operator Impeccable ESG credentials Excel in Development Social Licence
©2021, Rio Tinto, All Rights Reserved 13 Our portfolio to perform strongly in scenarios with proactive climate action 1Targets are for scope 1 and 2 GHG emissions, for managed and non-managed operations on an equity basis 2Short Term Incentive Plan: 20% weighting to safety (unchanged) and 15% to ESG performance. The 2020 Climate report can be found at riotinto.com Our Scope 3 goals to guide our partnerships - Technology for reductions in steelmaking carbon intensity of at least 30% from 2030 - Breakthrough technologies to deliver carbon neutral steelmaking pathways by 2050 - Develop breakthrough technology enabling of zero-carbon aluminium smelting - Ambition to reach net zero emissions from shipping of our products by 2050 2020 Highlights - Reduced emissions by 1.1Mt CO2e or 3% vs 2018 baseline, though flat in 2020 - $98m, 34MW solar plant at Gudai-Darri approved $14.5m Baowu-Tsinghua partnership & Tsinghua University - $140m committed of the $1bn announced for climate-related projects Governance - The Board intends to put the climate report to an advisory vote at 2022 AGMs - Strengthened link between executive remuneration & our ESG performance forming 35%2 of Short Term Incentive Plans Our targets1 - 30% reduction in emissions intensity by 2030 from 2018 levels - 15% reduction in absolute emissions by 2030 from 2018 levels - Our growth, overall, between now and 2030 will be carbon neutral - Underpinned by approximately $1bn climate-related spend over next 5 years - Ultimately Our ambition is for net zero emissions from our operations by 2050 Best operator Impeccable ESG credentials Excel in Development Social Licence
Citadel JV SIPA Alloy Carawine Woodie Woodie Nifty Carawine Telfer Magnum Calibre 0 100 km Significant Paterson footprint with potential beyond Winu – Extensive portfolio of 100% owned tenure, majority owned joint venture (JV) tenure, and active earn-in opportunities – Continued positive engagement and partnership with local Traditional Owner and community groups – Testing potential to leverage regional synergies with the Winu development – In 2020, RTX continued target generation and target testing work, with 23,850m of drilling completed across 17 targets, with encouraging results in the Citadel JV – In 2021, planned activity includes: – Ground geophysical surveys to identify new targets – Drilling at Citadel, SIPA, Alloy and Carawine JVs, Winu orbit – Mining studies focussed on hydrogeology, metallurgy, geotechnical risks and closure planning – Targeting first ore in 2024, subject to regulatory approvals, Traditional Owner and other consents and COVID-19 restrictions RT Paterson JV’s RT Status Citadel JV (Antipa) 51% Secured SIPA, Carrawine, Alloy Earning In ©2021, Rio Tinto, All Rights Reserved 14 Best operator Impeccable ESG credentials Excel in Development Social Licence
Oyu Tolgoi Underground Developing a world-class asset Estimate for Panel 01: $6.75bn development capex; Safe & feasible pathway to October 2022 sustainable production One of the largest block cave mines. Proven strength in safety & productivity Talented & committed workforce: 12,000 employees of which 95% are Mongolian nationals >$11bn spent since 2010, COVID-19 support, 70% of FDI*, 1/3rd of GDP** Other milestones are in progress, critical to project delivery Best operator Impeccable ESG credentials Excel in Development Social Licence ©2021, Rio Tinto, All Rights Reserved 15 1The level of accuracy of the remaining capital and schedule within the definitive estimate is at a better level than feasibility study. The 2020 estimate assumed COVID-19 restrictions in 2021 that were no more stringent than those experienced in September 2020 and noted that should COVID-19 constraints continue beyond 2021 or should the COVID-19 situation escalate further in 2021 leading to tougher restrictions, additional costs and schedule impacts will arise. Since the definitive estimate, Mongolia has implemented additional restrictions in response to community transmission cases, and in March 2021 the first cases of COVID-19 were identified at Oyu Tolgoi resulting in temporary site shutdown, quarantine measures and further travel and movement restrictions. The impact of these additional restrictions, which are beyond those experienced in September 2020, is ongoing and still to be determined. | *Foreign direct investment | **Gross domestic product
©2021, Rio Tinto, All Rights Reserved 16 We are committed to the Simandou project and Guinea – One of the world’s largest untapped and richest high-grade iron ore deposits, located in Guinea – High-grade ores can support the transition to lower-carbon steel – Strengthens Rio Tinto’s iron ore portfolio as well as our product offering – Complements Rio Tinto iron ore operations in the Pilbara, Western Australia – Competitively positioned as a mid-ranking producer on the cost curve – Diversifies and strengthens the economy of Guinea and local communities – There are factors coming together now to support its development with or without Rio Tinto Best operator Impeccable ESG credentials Excel in Development Social Licence
©2021, Rio Tinto, All Rights Reserved 17 Jadar: Progressing technical studies and establishing trust – Lithium-boron deposit with the potential to make Serbia a major global producer. Progressing feasibility study; expected to complete end of 2021. If approved, construction of the facility would commence in early 2022 and take up to four years – The project could produce ~55 thousand tonnes of battery-grade lithium carbonate, 160 thousand tonnes of boric acid (B2O3 units) and 255 thousand tonnes of sodium sulphate per year1 – The scale and high-grade nature of the Jadar mineralisation will ensure a long life operation in the first quartile of operating costs for both lithium and boric acid – Significant investment for Serbia with both direct and indirect economic benefits and will become the country’s second largest exporter Best operator Impeccable ESG credentials Excel in Development Social Licence 1These production targets were previously reported in a release to the ASX dated 10 December 2020, “Rio Tinto declares maiden Ore Reserve at Jadar”. All material assumptions underpinning the production targets continue to apply and have not materially changed.
EXHIBIT 99.7
Media release

Charge On Innovation Challenge: Global competition launched to electrify mine truck fleets
12 May 2021
MELBOURNE, Australia-- BHP, Rio Tinto, and Vale, three of the world’s biggest resource companies, have launched the Charge On Innovation Challenge, a global competition for technology innovators to develop new concepts for large-scale haul truck electrification systems to help significantly cut emissions from surface mine operations and unlock safety, productivity, and operational improvements.
BHP, Rio Tinto, and Vale are the Founding Patrons of the Challenge, in partnership with Australia’s Mining Equipment, Technology and Services (METS) industry body Austmine. The Challenge is expected to attract additional interest from resource companies that maintain substantial haul truck fleets and are looking for innovative concepts to deliver electricity to large battery-electric haul trucks.
Current stationary charging systems require substantial time to charge large trucks, which would result in significant lost productivity. The mining industry needs multi-megawatt scale fast charging concepts capable of delivering around 400kWh to charge (and propel) a truck within the truck’s haul cycle (load, travel, dump, return, queue).
“METS and mining companies are united on the Challenge to reduce emissions across the supply chain,” said Austmine CEO Christine Gibbs Stewart.
“With 80% of METS companies supplying products and services outside mining, the Challenge leverages the experience and innovation of industries in the automotive, battery makers, aerospace, defence and other sectors,” Ms Gibbs Stewart said.
“We are confident that we will find a solution to the delivery of electricity to trucks in the complex operating environment of a large surface mine. We expect the Challenge will attract companies from a broad range of sectors including mining, automotive, aerospace, agriculture, and defence to deliver selected charging concepts to create a standard product that can interface with all trucks.”
President of BHP Minerals Australia Edgar Basto said: “We expect the Challenge will stimulate innovative ideas, some of which could be immediately applied to existing diesel-electric equipment and help fast-track implementation of longer-term solutions. We understand that these challenges will not be solved overnight, but together we can find the best concepts that can be applied across the industry.”
Rio Tinto Group Executive Safety, Technical and Projects Mark Davies said: “This is a global call-out to innovators to change the way haul truck systems operate in the mining sector. Innovation is the key to decarbonisation, and we expect the Challenge will deliver exciting new concepts that could drive huge long-term benefits for our industry and the environment.
“Partnerships and collaborations across a diverse range of sectors can drive significant technological change. This is an important, industry-wide approach that has potential to create new jobs and opportunities for suppliers, both globally and locally.”
Carlos Mello, Ferrous Engineering Director of Vale said: “Mine electrification requires considerable integration between mine planning and operations. We need to develop new charging solutions that can be incorporated into our operations in parallel to the development of battery trucks, to ensure we create a truly sustainable electric haulage system in all aspects – clean, competitive and flexible.”
The mining industry needs to be at the forefront of tackling the climate challenge. The Charge On Innovation Challenge is a great example of the current collaborative work being done by the mining industry and mobile equipment manufacturers to decarbonise mining fleets. In addition to providing a zero-carbon energy source, the conversion of mobile mining equipment to battery electric can potentially unlock value, as electric motors have fewer moving parts when compared to standard equipment.
Several non-traditional mining sector vendors are actively developing technologies that can be applied to mine electrification. The Challenge is expected to demonstrate an emerging market for charging solutions in mining, accelerate commercialisation of solutions, and integrate innovations from other industries into the mining sector.
The Challenge Expression of Interest process will open on Tuesday, 18 May, and candidates who make the short list are expected to pitch their concepts later during this calendar year.
For more information, visit the website www.chargeoninnovation.com.
Media release Page 2 of 2 | ||
EXHIBIT 99.8
Media release

Rio Tinto partners with InoBat to explore innovative lithium battery initiative
25 May 2021
LONDON--(BUSINESS WIRE)-- Rio Tinto and InoBat, a European battery technology and manufacturing company, have signed a Memorandum of Understanding to work together to accelerate the establishment of a “cradle to cradle” battery manufacturing and recycling value chain in Serbia. The partnership will cover the full commodity life-cycle from mining through to recycling of lithium.
Rio Tinto’s Jadar project in Serbia, one of the largest greenfield lithium projects in development, has the potential to produce approximately 55 thousand tonnes of battery grade lithium carbonate in Europe, one of the world’s largest growing electric vehicles markets. InoBat, a European based battery manufacturer with a battery research and development facility and pilot plant being developed in Slovakia intends to scale up its future production, through gigafactories to be built in the EMEA region. InoBat’s goal is to serve the Europen market with innovative energy solutions, including production and recycling of electric vehicle batteries.
Managing director of Rio Tinto’s borates and lithium businesses, Marnie Finlayson said ”This collaboration with InoBat will enable an important exchange of knowledge and information on lithium processing, recycling and technologies for the next generation of batteries. It is a visionary initiative and one that is aligned with Rio Tinto’s commitment to partnerships that provide solutions to combat climate change.”
It is envisaged the collaboration between Jadar and InoBat will also encourage the development of a complete European lithium and electric vehicle battery value chain that will harness and enhance local skills, environmental, social and governance standards and cross-border interactions for the benefit of Serbia and other European economies that wish to collaborate.
Marian Bocek, Chief executive officer of InoBat Auto said “The signing of Memorandum of Understanding with Rio Tinto represents an important step in achieving InoBat’s goal to utilise a European-based value chain and support European bid for technological independence. Our unique “cradle to cradle” approach covers the whole life-cycle of batteries from mining to recycling, in order to underpin circular economy efforts and the Agenda 2030 Sustainable Development Goals.”
In 2020, Rio Tinto approved an investment of almost US$200 million to complete the final phase of study at the Jadar project, which is expected to be finalised in 2021, with an investment decision to follow. The scale and high grade nature of the Jadar deposit provides the potential for a mine to supply lithium products into the electric vehicle value chain for decades. If approved, construction of a mine to the highest environmental standards would take up to four years and would be a significant investment for Serbia with direct and indirect economic benefits to the Serbian economy.
| Contacts | Please direct all enquiries to media.enquiries@riotinto.com | ||||
Media Relations, UK Illtud Harri M +44 7920 503 600 David Outhwaite M +44 7787 597 493 Media Relations, Americas Matthew Klar T +1 514 608 4429 Investor Relations, UK Menno Sanderse M: +44 7825 195 178 David Ovington M +44 7920 010 978 Clare Peever M +44 7788 967 877 | Media Relations, Australia Jonathan Rose M +61 447 028 913 Matt Chambers M +61 433 525 739 Jesse Riseborough M +61 436 653 412 Investor Relations, Australia Natalie Worley M +61 409 210 462 Amar Jambaa M +61 472 865 948 | ||||
Media release Page 2 of 2 | ||
EXHIBIT 99.9
Notice to ASX/LSE

27 May 2021 | ||
Publication of Report on Payments to Governments for the year ended 31 December 2020
Introduction
Our report on payments to governments made by Rio Tinto and its subsidiary undertakings for the year ended 31 December 2020 as required under the UK’s Report on Payments to Governments Regulations 2014 (as amended in December 2015) was filed at Companies House today. These UK Regulations enact domestic rules in line with Chapter 10 of the EU Accounting Directive. The report also satisfies the requirements of Rule 4.3A of the Disclosure and Transparency Rules of the Financial Conduct Authority in the United Kingdom.
We also continue to publish, on a voluntary basis, our annual Taxes paid report. The Taxes paid: Our economic contribution 2020 report is more comprehensive than the mandatory filing and includes the wider payments made by Rio Tinto to governments in each of the main countries in which we operate.
Rio Tinto paid US$8.4 billion of taxes and royalties and a further US$1.4 billion on behalf of its employees during 2020.
Our Taxes Paid report also includes information about our tax strategy and governance, international related party dealings and other disclosures.
The Taxes Paid: Our economic contribution 2020 report is available to download at
https://www.riotinto.com/invest/reports/taxes-paid-report-2020
Text of Report on Payments to Governments for the year 2020 filed at Companies House:
Notice to ASX/LSE Page 1 of 8 | ||
GOVERNMENT PAYMENTS BY TYPE | |||||||||||||||||||||||||||||||||||||||||||||||
| Country Code | Government | Payment Type | Unit Measure | Volume | Valuation Method | Currency | Amount | Company Name | Company Number | Notes | Report Name | Report End Date | Version | Report Notes | Filing Date | ||||||||||||||||||||||||||||||||
| AUS | AUSTRALIAN TAXATION OFFICE | Tax | 0 | USD | 4,566,295,787 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| AUS | NORTHERN TERRITORY REVENUE OFFICE | Royalties | 0 | USD | 38,207,716 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| AUS | NORTHERN TERRITORY REVENUE OFFICE | Fees | 0 | USD | 4,496,744 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| AUS | STATE OF QUEENSLAND | Royalties | 0 | USD | 122,643,456 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| AUS | STATE OF QUEENSLAND | Fees | 0 | USD | 1,067,619 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| AUS | STATE OF WESTERN AUSTRALIA | Royalties | 0 | USD | 1,786,932,069 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| AUS | STATE OF WESTERN AUSTRALIA | Fees | 0 | USD | 3,925,369 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| BRA | FEDERAL REVENUE OF BRAZIL | Fees | 0 | USD | 259,993 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| CAN | CANADA REVENUE AGENCY | Tax | 0 | USD | 331,119,856 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| CAN | GOVERNMENT OF NEWFOUNDLAND AND LABRADOR | Tax | 0 | USD | 37,125,636 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| CAN | GOVERNMENT OF NEWFOUNDLAND AND LABRADOR | Fees | 0 | USD | 103,686 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| CAN | INNU NATION (LABRADOR) | Fees | 0 | USD | 2,389,678 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| CAN | LES INNUS DE UASHAT MAK MANI-UTENAM AND LES INNUS DE MATIMEKUSH-LAC JOHN | Fees | 0 | USD | 17,339,887 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| CAN | CONSEIL DES INNUS DE EKUANITSHIT | Fees | 0 | USD | 2,717,551 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| CAN | NASKAPI NATION OF KAWAWACHIKAMACH | Fees | 0 | USD | 223,932 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| CAN | LUTSEL K'E DENE FIRST NATION | Fees | 0 | USD | 163,642 | RIO TINTO PLC | 00719885 | A | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||
| CAN | GOVERNMENT OF NORTHWEST TERRITORIES | Tax | 0 | USD | 13,824,753 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| CAN | GOVERNMENT OF NORTHWEST TERRITORIES | Fees | 0 | USD | 4,663,241 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| CAN | REVENU QUÉBEC | Tax | 0 | USD | 7,121,530 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| CAN | TLICHO GOVERNMENT | Fees | 0 | USD | 962,525 | RIO TINTO PLC | 00719885 | A | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||
| CAN | YELLOWKNIVES DENE FIRST NATION | Fees | 0 | USD | 881,516 | RIO TINTO PLC | 00719885 | A | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||
| CHL | CHILE - SERVICIO DE IMPUESTOS INTERNOS | Tax | 0 | USD | 156,371 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| MDG | MADAGASCAR - GENERAL DIRECTION OF TAXES | Tax | 0 | USD | 635,563 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| MDG | MADAGASCAR - GENERAL DIRECTION OF TAXES | Royalties | 0 | USD | 2,138,602 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
Notice to ASX/LSE Page 2 of 8 | ||
| MDG | MADAGASCAR - GENERAL DIRECTION OF TAXES | Fees | 0 | USD | 201,949 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| MNG | GOBI OYU DEVELOPMENT SUPPORT FUND | Bonuses | 0 | USD | 5,274,434 | RIO TINTO PLC | 00719885 | B | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||
| MNG | KHANBOGD SUM | Fees | 0 | USD | 348,553 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| MNG | MONGOLIA - GENERAL DEPARTMENT OF TAXATION | Royalties | 0 | USD | 69,430,131 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| MNG | UMNUGOBI AIMAG | Tax | 0 | USD | 7,522,330 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| MNG | MONGOLIA - GENERAL DEPARTMENT OF TAXATION | Fees | 0 | USD | 221,807 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| MNG | ULAANBAATAR CITY | Fees | 0 | USD | 1,615,200 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| MNG | UMNUGOBI AIMAG | Fees | 0 | USD | 5,400,000 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| PER | PERU - THE NATIONAL SUPERINTENDENCY OF CUSTOMS AND TAX ADMINISTRATION | Fees | 0 | USD | 12,119,922 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| USA | KERN COUNTY (CA) | Fees | 0 | USD | 9,403,144 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| USA | SALT LAKE COUNTY (UT) | Fees | 0 | USD | 38,648,323 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| USA | USA - INTERNAL REVENUE SERVICE | Tax | 0 | USD | (60,198,641) | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| USA | USA - INTERNAL REVENUE SERVICE | Fees | 0 | USD | 1,246,156 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| USA | UTAH STATE TAX COMMISSION | Royalties | 0 | USD | 9,331,992 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| ZAF | SOUTH AFRICAN REVENUE SERVICES | Tax | 0 | USD | 53,944,908 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| ZAF | SOUTH AFRICAN REVENUE SERVICES | Royalties | 0 | USD | 6,198,616 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||
| TOTAL | 7,106,105,546 | ||||||||||||||||||||||||||||||||||||||||||||||
Note A: This is 60% of total payment being Rio Tinto share of Diavik | |||||||||||||||||||||||||||||||||||||||||||||||
Note B: Bonuses include amounts paid under Oyu Tolgoi LLC's Communities Co-operation Agreement | |||||||||||||||||||||||||||||||||||||||||||||||
Notice to ASX/LSE Page 3 of 8 | ||
| GOVERNMENT PAYMENT TOTALS | ||||||||||||||||||||||||||||||||||||||
| Government | Country Code | Amount | Currency | Company Name | Company Number | Report End Date | Version | Notes | Report Name | Report Notes | Filing Date | |||||||||||||||||||||||||||
| AUSTRALIAN TAXATION OFFICE | AUS | 4,566,295,787 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | C | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| FEDERAL REVENUE OF BRAZIL | BRA | 259,993 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | C | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| CANADA REVENUE AGENCY | CAN | 331,119,856 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | C | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| CHILE - SERVICIO DE IMPUESTOS INTERNOS | CHL | 156,371 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | C | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| GOBI OYU DEVELOPMENT SUPPORT FUND | MNG | 5,274,434 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | D | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| INNU NATION (LABRADOR) | CAN | 2,389,678 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | C | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| LES INNUS DE UASHAT MAK MANI-UTENAM AND LES INNUS DE MATIMEKUSH-LAC JOHN | CAN | 17,339,887 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | C | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| CONSEIL DES INNUS DE EKUANITSHIT | CAN | 2,717,551 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | C | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| KERN COUNTY (CA) | USA | 9,403,144 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | |||||||||||||||||||||||||||||
| KHANBOGD SUM | MNG | 348,553 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | D | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| LUTSEL K'E DENE FIRST NATION | CAN | 163,642 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | C | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| MADAGASCAR - GENERAL DIRECTION OF TAXES | MDG | 2,976,114 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | C | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| MONGOLIA - GENERAL DEPARTMENT OF TAXATION | MNG | 69,651,938 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | D | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| GOVERNMENT OF NEWFOUNDLAND AND LABRADOR | CAN | 37,229,322 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | C | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| NORTHERN TERRITORY REVENUE OFFICE | AUS | 42,704,460 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | C | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| GOVERNMENT OF NORTHWEST TERRITORIES | CAN | 18,487,994 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | C | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| YELLOWKNIVES DENE FIRST NATION | CAN | 881,516 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | C | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| PERU - THE NATIONAL SUPERINTENDENCY OF CUSTOMS AND TAX ADMINISTRATION | PER | 12,119,922 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | C | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| REVENU QUÉBEC | CAN | 7,121,530 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | C | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| STATE OF QUEENSLAND | AUS | 123,711,075 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | C | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| SALT LAKE COUNTY (UT) | USA | 38,648,323 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | |||||||||||||||||||||||||||||
| SOUTH AFRICAN REVENUE SERVICES | ZAF | 60,143,524 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | C | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| NASKAPI NATION OF KAWAWACHIKAMACH | CAN | 223,932 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | C | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| TLICHO GOVERNMENT | CAN | 962,525 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | C | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| ULAANBAATAR CITY | MNG | 1,615,200 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | D | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| UMNUGOBI AIMAG | MNG | 12,922,330 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | D | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| USA - INTERNAL REVENUE SERVICE | USA | (58,952,485) | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | |||||||||||||||||||||||||||||
| UTAH STATE TAX COMMISSION | USA | 9,331,992 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | |||||||||||||||||||||||||||||
| STATE OF WESTERN AUSTRALIA | AUS | 1,790,857,438 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | C | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||||
| TOTAL | 7,106,105,546 | |||||||||||||||||||||||||||||||||||||
Note C: Amounts in local currency are converted to US$ at the average exchange rate for the year. | ||||||||||||||||||||||||||||||||||||||
Note D: Amounts in local currency are converted to US$ at the exchange rate at the time the payments were made. | ||||||||||||||||||||||||||||||||||||||
| PROJECT PAYMENTS BY TYPE | |||||||||||||||||||||||||||||||||||||||||||||||||||||
| Project Code | Project Name | Country Code List | Payment Type | Unit Measure | Volume | Valuation Method | Currency | Amount | Company Name | Company Number | Notes | Report Name | Report End Date | Version | Report Notes | Filing Date | |||||||||||||||||||||||||||||||||||||
| AUS01 | PILBARA - WESTERN AUSTRALIA | AUS | Tax | 0 | USD | 4,616,014,627 | RIO TINTO PLC | 00719885 | E | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||||||
Notice to ASX/LSE Page 4 of 8 | ||
| AUS01 | PILBARA - WESTERN AUSTRALIA | AUS | Royalties | 0 | USD | 1,779,079,959 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| AUS01 | PILBARA - WESTERN AUSTRALIA | AUS | Fees | 0 | USD | 2,573,282 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| CAN01 | IRON ORE COMPANY OF CANADA | CAN | Tax | 0 | USD | 374,729,125 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| CAN01 | IRON ORE COMPANY OF CANADA | CAN | Fees | 0 | USD | 20,057,183 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| MNG01 | OYU TOLGOI - MONGOLIA | MNG | Tax | 0 | USD | 7,522,330 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| MNG01 | OYU TOLGOI - MONGOLIA | MNG | Royalties | 0 | USD | 69,430,131 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| MNG01 | OYU TOLGOI - MONGOLIA | MNG | Fees | 0 | USD | 7,585,560 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| MNG01 | OYU TOLGOI - MONGOLIA | MNG | Bonuses | 0 | USD | 5,274,434 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| USA01 | KENNECOTT UTAH COPPER - US | USA | Tax | 0 | USD | (44,119,904) | RIO TINTO PLC | 00719885 | E | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||||||
| USA01 | KENNECOTT UTAH COPPER - US | USA | Royalties | 0 | USD | 9,331,992 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| USA01 | KENNECOTT UTAH COPPER - US | USA | Fees | 0 | USD | 38,648,323 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| USA02 | RESOLUTION COPPER - US | USA | Tax | 0 | USD | (9,354,346) | RIO TINTO PLC | 00719885 | E | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||||||
| AUS04 | ARGYLE - AUSTRALIA | AUS | Tax | 0 | USD | (21,159,343) | RIO TINTO PLC | 00719885 | F | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||||||
| AUS04 | ARGYLE - AUSTRALIA | AUS | Royalties | 0 | USD | 6,183,561 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| AUS04 | ARGYLE - AUSTRALIA | AUS | Fees | 0 | USD | 1,039,418 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| CAN02 | DIAVIK - CANADA | CAN | Tax | 0 | USD | 14,130,116 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| CAN02 | DIAVIK - CANADA | CAN | Fees | 0 | USD | 6,670,924 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| CAN03 | RIO TINTO FER ET TITANE - CANADA | CAN | Tax | 0 | USD | (443,369) | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| CAN03 | RIO TINTO FER ET TITANE - CANADA | CAN | Fees | 0 | USD | 2,717,551 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| MDG01 | QIT MADAGASCAR MINERALS | MDG | Tax | 0 | USD | 635,563 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| MDG01 | QIT MADAGASCAR MINERALS | MDG | Royalties | 0 | USD | 2,138,602 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| MDG01 | QIT MADAGASCAR MINERALS | MDG | Fees | 0 | USD | 201,949 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| ZAF01 | RICHARDS BAY MINERALS - SOUTH AFRICA | ZAF | Tax | 0 | USD | 53,944,908 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| ZAF01 | RICHARDS BAY MINERALS - SOUTH AFRICA | ZAF | Royalties | 0 | USD | 6,198,616 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| USA03 | US BORAX | USA | Tax | 0 | USD | 6,198,217 | RIO TINTO PLC | 00719885 | E | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||||||
| USA03 | US BORAX | USA | Fees | 0 | USD | 9,403,144 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
Notice to ASX/LSE Page 5 of 8 | ||
| AUS05 | DAMPIER SALT - AUSTRALIA | AUS | Tax | 0 | USD | 19,413,623 | RIO TINTO PLC | 00719885 | E | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||||||
| AUS05 | DAMPIER SALT - AUSTRALIA | AUS | Royalties | 0 | USD | 1,668,548 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| AUS05 | DAMPIER SALT - AUSTRALIA | AUS | Fees | 0 | USD | 312,668 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| AUS06 | GOVE - AUSTRALIA | AUS | Royalties | 0 | USD | 38,207,716 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| AUS06 | GOVE - AUSTRALIA | AUS | Fees | 0 | USD | 4,496,744 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| AUS07 | WEIPA INCLUDING AMRUN - AUSTRALIA | AUS | Tax | 0 | USD | (9,214,117) | RIO TINTO PLC | 00719885 | E | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||||||
| AUS07 | WEIPA INCLUDING AMRUN - AUSTRALIA | AUS | Royalties | 0 | USD | 122,643,456 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| AUS07 | WEIPA INCLUDING AMRUN - AUSTRALIA | AUS | Fees | 0 | USD | 1,067,619 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| AUSEXP01 | EXPLORATION - AUSTRALIA | AUS | Tax | 0 | USD | (38,759,001) | RIO TINTO PLC | 00719885 | F | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||||||
| CHLEXP01 | EXPLORATION - CHILE | CHL | Tax | 0 | USD | 156,371 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| BRAEXP01 | EXPLORATION - BRAZIL | BRA | Fees | 0 | USD | 259,993 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| PEREXP01 | EXPLORATION - PERU | PER | Fees | 0 | USD | 12,119,922 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| USAEXP01 | EXPLORATION - US | USA | Tax | 0 | USD | (12,146,705) | RIO TINTO PLC | 00719885 | E | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | ||||||||||||||||||||||||||||||||||||||||
| USAEXP01 | EXPLORATION - US | USA | Fees | 0 | USD | 1,246,156 | RIO TINTO PLC | 00719885 | Extractive Industry Reporting | 31-Dec-20 | 2 | 26-May-21 | |||||||||||||||||||||||||||||||||||||||||
| TOTAL | 7,106,105,546 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Note E: Project amount includes payments / refunds between entities within tax groups where final payments to government are paid by the head / representative entity on behalf of the tax group. | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Note F: Project amount includes payments / refunds between entities within tax groups where final payments to government are paid by the head / representative entity on behalf of the tax group. This does not represent an actual refund from the Australian Tax Office. | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Notice to ASX/LSE Page 6 of 8 | ||
| PROJECT PAYMENT TOTALS | |||||||||||||||||||||||||||||||||||
| Project Name | Project Code | Amount | Currency | Company Name | Company Number | Report End Date | Version | Notes | Report Name | Report Notes | Filing Date | ||||||||||||||||||||||||
| PILBARA - WESTERN AUSTRALIA | AUS01 | 6,397,667,868 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||
| IRON ORE COMPANY OF CANADA | CAN01 | 394,786,308 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||
| OYU TOLGOI - MONGOLIA | MNG01 | 89,812,455 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||
| KENNECOTT UTAH COPPER - US | USA01 | 3,860,411 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||
| RESOLUTION COPPER - US | USA02 | (9,354,346) | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||
| QIT MADAGASCAR MINERALS | MDG01 | 2,976,114 | USD | RIO TINTO PLC | 00719886 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||
| ARGYLE - AUSTRALIA | AUS04 | (13,936,364) | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||
| DIAVIK - CANADA | CAN02 | 20,801,040 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||
| RIO TINTO FER ET TITANE - CANADA | CAN03 | 2,274,182 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||
| RICHARDS BAY MINERALS - SOUTH AFRICA | ZAF01 | 60,143,524 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||
| US BORAX | USA03 | 15,601,361 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||
| DAMPIER SALT - AUSTRALIA | AUS05 | 21,394,839 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||
| GOVE - AUSTRALIA | AUS06 | 42,704,460 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||
| WEIPA INCLUDING AMRUN - AUSTRALIA | AUS07 | 114,496,958 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||
| EXPLORATION - AUSTRALIA | AUSEXP01 | (38,759,001) | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||
| EXPLORATION - CHILE | CHLEXP01 | 156,371 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||
| EXPLORATION - BRAZIL | BRAEXP01 | 259,993 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||
| EXPLORATION - PERU | PEREXP01 | 12,119,922 | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||
| EXPLORATION - US | USAEXP01 | (10,900,549) | USD | RIO TINTO PLC | 00719885 | 31-Dec-20 | 2 | Extractive Industry Reporting | 26-May-21 | ||||||||||||||||||||||||||
| TOTAL | 7,106,105,546 | ||||||||||||||||||||||||||||||||||
Notice to ASX/LSE Page 7 of 8 | ||
LEI: 213800YOEO5OQ72G2R82
Classification: 3.1 Additional regulated information required to be disclosed under the laws of a Member State.
Contacts Please direct all enquiries to media.enquiries@riotinto.com
Media Relations, UK Illtud Harri M +44 7920 503 600 David Outhwaite M +44 7787 597 493 Media Relations, Americas Matthew Klar T +1 514 608 4429 Investor Relations, UK Menno Sanderse M: +44 7825 195 178 David Ovington M +44 7920 010 978 Clare Peever M +44 7788 967 877 | Media Relations, Australia Jonathan Rose M +61 447 028 913 Matt Chambers M +61 433 525 739 Jesse Riseborough M +61 436 653 412 Investor Relations, Australia Natalie Worley M +61 409 210 462 Amar Jambaa M +61 472 865 948 | ||||
Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885 | Rio Tinto Limited Level 7, 360 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404 | ||||
This announcement is authorised for release to the market by Steve Allen, Rio Tinto’s Group Company Secretary.
Notice to ASX/LSE Page 8 of 8 | ||
EXHIBIT 99.10
Media release

Rio Tinto and Comptech partner to deliver next generation of electric vehicle and 5G giga-casting alloys
27 May 2021
MONTREAL, Canada – Rio Tinto and Comptech are partnering to bring a new generation of aluminium alloys to the market for use in advanced technologies such as electric vehicles and 5G antennas.
Rio Tinto’s metallurgical experts have designed the alloys for the semi-solid Rheocasting process offered by Comptech, to meet the requirements of producing large, specialised single piece designs, known as giga-casting.
The alloys offer high strength, electrical and thermal conductivity properties, while Rheocasting allows fast, low cost production of advanced lightweight designs. The products are currently undergoing qualification with automakers in Europe.
Rio Tinto vice president Sales and Marketing Aluminium Tolga Egrilmezer said: “Through this partnership, we are delivering a new range of specialised alloys designed to deliver high performance, lower cost solutions for advanced applications like electric vehicles and 5G antennas. This is an area of emerging demand where our industry leading research and development capability allows us to deliver products that meet the specific needs of manufacturers and end customers.”
Comptech Group CEO and owner Per Jansson said: “We are in the capacity ramp up for the next generation of advanced technologies across sectors such as automotive and communications, and our customers, both foundries and OEM´s will need the development of more advanced parts. This partnership positions us to offer customers the combined advantages of our casting process expertise and Rio Tinto’s technical strength and preferred alloys suite.”
Notes to editors
Rheocasting is an emerging semi solid casting process that allows the production of low-cost aluminium components with high strength, extremely low porosity and a broad range of possible alloys. Comptech has seen a breakthrough in uptake of the process over recent years, with orders for high volume deliveries to the automotive industry as well as supplying equipment supported with technical expertise.
The Rheocasting process is ideally suited to giga-castings for electric vehicles, where a single large aluminium part is produced to significantly reduce the number of components, weight and assembly time and cost. It also offers significant advantages in the production of 5G antennas, where a single large aluminium housing can deliver high thermal conductivity and sealing features with reduced manufacturing, installation and maintenance cost.
About Rio Tinto Aluminium
Rio Tinto is an industry leader in responsible aluminium production. In 2016, Rio Tinto launched RenewAl, the world’s first certified low CO2 primary aluminium brand. It has helped to pioneer responsible production standards for the global industry as a founding member of the Aluminium Stewardship Initiative (ASI), becoming the first producer to offer ASI Aluminium in 2018. Earlier this year, Rio Tinto also launched START, the first sustainability label for aluminium delivered to customers through blockchain technology, enabling them to differentiate between end products based on their environmental, social and governance credentials.
About Comptech
Comptech is a R&D focused supplier of know-how and equipment for aluminium semi-solid castings. The company has a vision of being the number one producer of equipment, know-how and complicated parts to meet the challenges of tomorrow’s designs.
| Contacts | Please direct all enquiries to media.enquiries@riotinto.com | ||||
Media Relations, UK Illtud Harri M +44 7920 503 600 David Outhwaite M +44 7787 597 493 Media Relations, Americas Matthew Klar T +1 514 608 4429 Investor Relations, UK Menno Sanderse M: +44 7825 195 178 David Ovington M +44 7920 010 978 Clare Peever M +44 7788 967 877 | Media Relations, Australia Jonathan Rose M +61 447 028 913 Matt Chambers M +61 433 525 739 Jesse Riseborough M +61 436 653 412 Investor Relations, Australia Natalie Worley M +61 409 210 462 Amar Jambaa M +61 472 865 948 | ||||
Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885 | Rio Tinto Limited Level 7, 360 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404 | ||||
Media release Page 2 of 2 | ||