Rio Tinto PLC 6-K, filed Aug 3, 2020
Rio Tinto PLC (RIO)
6-K
2020-08-03
For: 2020-07-31
View Original
Added on
April 06, 2026
About this 6-K
Rio Tinto PLC filed this 6-K on August 3, 2020.
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, DC 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13A-16 OR 15D-16 OF
THE SECURITIES EXCHANGE ACT OF 1934
Month of July 2020
| Commission file number: 001-10533 | Commission file number: 001-34121 | ||||
| Rio Tinto plc | Rio Tinto Limited | ||||
| ABN 96 004 458 404 | |||||
| (Translation of registrant’s name into English) | (Translation of registrant’s name into English) | ||||
| 6 St. James’s Square | Level 7, 360 Collins Street | ||||
| London, SW1Y 4AD, United Kingdom | Melbourne, Victoria 3000, Australia | ||||
| (Address of principal executive offices) | (Address of principal executive offices) | ||||
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F:
Form 20-F ☒ Form 40-F ☐
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): ☐
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): ☐
Indicate by check mark whether by furnishing the information contained in this Form, the registrant is also thereby furnishing the information to the Commission pursuant to
Rule 12g3-2(b) under the Securities Exchange Act of 1934.
Yes ☐ No ☒
If "Yes" is marked, indicate below the file number assigned to the registrant in connection
with Rule 12g3-2(b): 82- ________
EXHIBIT 99
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrants have duly caused this report to be signed on their behalf by the undersigned, thereunto duly authorised.
| Rio Tinto plc | Rio Tinto Limited | ||||||||||||||||
| (Registrant) | (Registrant) | ||||||||||||||||
| By | /s/ Steve Allen | By | /s/ Steve Allen | ||||||||||||||
| Name | Steve Allen | Name | Steve Allen | ||||||||||||||
| Title | Company Secretary | Title | Joint Company Secretary | ||||||||||||||
| Date | 3 August 2020 | Date | 3 August 2020 | ||||||||||||||
Exhibit 99.1 Notice to ASX/LSE Rio Tinto adds a strategy and development role to the executive committee 1 July 2020 Rio Tinto has added a new role to its executive committee as it considers the next phase of its transformation to reinforce the company’s commitment to strategy, technology and climate change in a new era. Peter Toth will become Group executive, Strategy and Development with a focus on leading Rio Tinto’s transformation efforts around portfolio, climate change, and closure, working in partnership with the product group and commercial teams. He will also assume responsibility for Rio Tinto Exploration and Ventures. Stephen McIntosh, Group executive of Growth & Innovation and Health, Safety & Environment (HSE) has decided to retire after more than 30 years with Rio Tinto, leaving the company on 30 September. Stephen joined Rio Tinto as an exploration geophysicist in 1987 and led the exploration team from 2011 to 2016, joining the executive committee in 2016. During his time with the company, Stephen built strong exploration, project and technology capabilities. With Stephen’s departure, Mark Davies will assume the role of Group executive, Safety, Technical and Projects, with a focus on maintaining the company’s longstanding commitment to safety, health and environment, while further building on the company’s efforts in technology and project delivery to support operational excellence in the years ahead. Both Peter and Mark will join the Rio Tinto executive committee on 1 October, reporting to chief executive, J-S Jacques. Peter, a dual Hungarian and Australian citizen, joined Rio Tinto in 2014 as global head of Strategy. In 2015, he became head of Corporate Development with responsibility for corporate strategy (including climate strategy) and business development. With over 25 years’ experience working in the resources industry around the world, he was the chief executive of ASX listed OM Holdings, an integrated manganese and silicon company, between 2008 and 2014. Prior to this he spent fourteen years with BHP Billiton in a range of roles, including the head of marketing for carbon steel materials. He is based in London. Mark, an Australian citizen, brings extensive international experience gained over 25 years with Rio Tinto in Australia, the US, the UK and Singapore. He joined the company in 1995 as a senior mechanical engineer and has worked in various operational and functional leadership roles during this time. These include chief commercial officer and interim CEO for the Iron and Titanium business unit, head of Group Risk and most recently, vice president, Global Procurement. Mark will move to Brisbane. Rio Tinto chief executive J-S Jacques said, “We remain committed to strong performance, disciplined capital allocation and a focus on value over volume as we transform our business to make the most of future opportunities in an increasingly complex world. With Peter and Mark joining the executive team we will enhance our focus in areas that will be absolutely vital for Rio Tinto’s future performance and success – strategy, technology and climate change. I welcome them both to our team. “As we welcome our new team members we also say goodbye to Steve, who has significantly contributed to our company over many decades. We are very grateful for his support and leadership in areas from exploration to innovation. We thank him for his commitment and I wish Steve and his family all the very best for the future.” Page 1 of 3
Notes to editors Stephen McIntosh Stephen will leave the company on 30 September 2020 and take long service leave until his retirement date on 31 December 2020. Leaving arrangements for Stephen McIntosh are governed by the Group's remuneration policy and will be finalised at the date of his retirement and will be disclosed in the Annual Report. Peter Toth and Mark Davies Peter Toth and Mark Davies will be issued standard Rio Tinto executive contracts, which includes a 12-month company notice period. They will receive a remuneration package that is in line with the Group’s remuneration policy, which is published on the company website. The 2020 Annual Report will contain details of the remuneration terms described above. Page 2 of 3
Contacts media.enquiries@riotinto.com riotinto.com Follow @RioTinto on Twitter Media Relations, United Kingdom Media Relations, Australia Illtud Harri Jonathan Rose M +44 7920 503 600 T +61 3 9283 3088 M +61 447 028 913 David Outhwaite T +44 20 7781 1623 Matt Chambers M +44 7787 597 493 T +61 3 9283 3087 M +61 433 525 739 Media Relations, Americas Matthew Klar Jesse Riseborough T +1 514 608 4429 T +61 8 6211 6013 M +61 436 653 412 Media Relations, Asia Grant Donald T +65 6679 9290 M +65 9722 6028 Investor Relations, United Kingdom Investor Relations, Australia Menno Sanderse Natalie Worley T: +44 20 7781 1517 T +61 3 9283 3063 M: +44 7825 195 178 M +61 409 210 462 David Ovington Amar Jambaa T +44 20 7781 2051 T +61 3 9283 3627 M +44 7920 010 978 M +61 472 865 948 Group Company Secretary Joint Company Secretary Steve Allen Tim Paine Rio Tinto plc Rio Tinto Limited 6 St James’s Square Level 7, 360 Collins Street London SW1Y 4AD Melbourne 3000 United Kingdom Australia T +44 20 7781 2000 T +61 3 9283 3333 Registered in England Registered in Australia No. 719885 ABN 96 004 458 404 This announcement is authorised for release to the market by Rio Tinto’s Group Company Secretary. Page 3 of 3
Exhibit 99.2
Notice to ASX/LSE

Total voting rights and issued capital
1 July 2020
In accordance with the Financial Conduct Authority’s (FCA) Disclosure Guidance and Transparency Rule 5.6.1R, Rio Tinto plc notifies the market that as of 30 June 2020:
1.Rio Tinto plc’s issued share capital comprised 1,255,737,423 Ordinary shares of 10p each, each with one vote.
2.9,046,354 Ordinary shares of 10p each are held in treasury. These shares are not taken into consideration in relation to the payment of dividends and voting at shareholder meetings.
Accordingly the total number of voting rights in Rio Tinto plc is 1,246,691,069. This figure may be used by shareholders (and others with notification obligations) as the denominator for the calculation by which they will determine if they are required to notify their interest in, or a change to their interest in, Rio Tinto plc under the FCA’s Disclosure Guidance and Transparency Rules.
Note:
As at the date of this announcement:
(a)Rio Tinto plc has also issued one Special Voting Share of 10p and one DLC Dividend Share of 10p in connection with its dual listed companies (‘DLC’) merger with Rio Tinto Limited which was designed to place the shareholders of both companies in substantially the same position as if they held shares in a single enterprise owning all of the assets of both companies;
(b)the Special Voting Share facilitates joint voting by shareholders of Rio Tinto plc and Rio Tinto Limited on joint electorate resolutions; and
(c)there are 371,216,214 publicly held Rio Tinto Limited shares in issue which do not form part of the share capital of Rio Tinto plc.
LEI: 213800YOEO5OQ72G2R82
Classification: 2.5 Total number of voting rights and capital disclosed under article 15 of the Transparency Directive
This announcement is authorised for release to the market by Rio Tinto’s Group Company Secretary.
Steve Allen Group Company Secretary | |||||
Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2058 Registered in England No. 719885 | |||||
Exhibit 99.3 Notice to ASX Oyu Tolgoi mine design confirms project schedule and cost ranges and update to Ore Reserves and Mineral Resources 3 July 2020 Oyu Tolgoi LLC has completed an updated feasibility study (OTFS20) and is in the process of submitting this to the Government of Mongolia. The OTFS20 has been prepared in accordance with Mongolian regulations and standards which require mining companies to submit updated feasibility studies every five years. The updated study incorporates a new mine design for Panel 0 of the Hugo Dummett North underground mine at Oyu Tolgoi. The new design also confirms that the caving method of mining remains valid and that the underground schedule and costs remain within the ranges previously disclosed. These ranges include a delay of 21 to 29 months for first sustainable production compared to the original feasibility study guidance in 2016 and an increase of $1.3 billion to $1.8 billion from the original $5.3 billion development capital. Detailed study, design, engineering and optimisation work is ongoing to support the definitive estimate of Panel 0 for the development of this world-class orebody, which remains due in the second half of 2020. These estimates are subject to any additional scheduling delays or increases in capital costs arising from the impacts of the ongoing COVID-19 pandemic. Arnaud Soirat, chief executive of Copper & Diamonds said “This amended mine design is another positive step in the development of the underground mine which will unlock the most valuable part of Oyu Tolgoi. We remain focused on delivering the underground project safely and within the guidance ranges we have announced on both cost and schedule.” The updated mine design is the result of the review announced by Rio Tinto in July 2019 when enhanced geotechnical and geological information obtained from drilling and mapping at depth suggested there may be some stability risks associated with the original mine design. The updated design retains two in-situ rock pillars on either side of Panel 0 for geotechnical stability. In the original mine design, these pillars were within the mining area. The updated design is supported by extensive geotechnical modelling and industry leading technical assurance. As a consequence of leaving the pillars in place, the material contained in the pillars has been reclassified from Ore Reserves to Mineral Resources. It is expected that part of the material contained in these pillars will be recoverable at a later stage following additional studies which are currently underway. Ore handling infrastructure will be relocated to the pillars, located immediately north and south of the current Panel 0 boundaries. Panels 1 and 2 will now be initiated as independent panels or mine blocks. Optimisation of mine designs for Panels 1 and 2 is ongoing and it is anticipated that this next phase of study may result in further movements in classifications of Ore Reserves and Mineral Resources. Any such movements will be reported following completion of the studies. Changes in the Hugo Dummett North Ore Reserves are shown below in Table A. Updates to Mineral Resources are shown in Table B. Ore Reserves and Mineral Resources are reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012 (JORC Code) and the ASX Listing Rules. Ore Reserves are presented in this release on a 100 per cent ownership basis. Rio Tinto’s ownership share is 33.5% of Hugo Dummett North and 29.5% of Hugo Dummett North Extension. Mineral Resources are reported exclusive of Ore Reserves and on the same ownership basis. Page 1 of 15
Table A: Changes to the Hugo Dummett North and Hugo Dummett North Extension Ore Reserves estimates between 31 December 2019 and 01 July 2020. Hugo Dummett North Probable Ore Reserves Average Mill Recovery Recoverable Metal Tonnes Cu Au Ag Cu Au Ag Cu Au Ag (Mt) (%) (g/t) (g/t) (%) (%) (%) (Mt) (M oz) (M oz) Reserves at end 2019 447 1.64 0.34 3.35 93 79 81 6.81 3.84 39.02 Material removed -47 2.75 0.68 5.36 94 82 86 -1.22 -0.85 -7.01 Reserves at 1 July 2020 400 1.51 0.29 3.11 93 79 80 5.60 2.99 32.00 Hugo Dummett North Extension Probable Ore Reserves Average Mill Recovery Recoverable Metal Tonnes Cu Au Ag Cu Au Ag Cu Au Ag (Mt) (%) (g/t) (g/t) (%) (%) (%) (Mt) (M oz) (M oz) Reserves at end 2019 32 1.64 0.57 3.84 93 81 83 0.49 0.47 3.28 Material added 7.7 1.10 0.38 2.75 92 80 81 0.08 0.07 0.55 Reserves at 1 July 2020 40 1.54 0.53 3.63 92 81 83 0.57 0.55 3.84 Table B: Changes to the Hugo Dummett North and Hugo Dummett North Extension Mineral Resource estimates between 31 December 2019 and 01 July 2020. Hugo Dummett North Measured Mineral Resources Indicated Mineral Resources Inferred Mineral Resources Total Mineral Resources Tonnes Cu Au Ag Tonnes Cu Au Ag Tonnes Cu Au Ag Tonnes Cu Au Ag (Mt) (%) (g/t) (g/t) (Mt) (%) (g/t) (g/t) (Mt) (%) (g/t) (g/t) (Mt) (%) (g/t) (g/t) Resources at 41 1.58 0.42 3.74 349 1.18 0.31 2.92 765 0.80 0.28 2.40 1155 0.94 0.29 2.61 end 2019 Material added 17 2.54 0.64 5.34 52 2.39 0.54 4.63 69 2.43 0.57 4.81 Resources at 1 58 1.86 0.48 4.21 401 1.34 0.34 3.14 765 0.80 0.28 2.40 1224 1.03 0.31 2.73 July 2020 Hugo Dummett North Extension Measured Mineral Resources Indicated Mineral Resources Inferred Mineral Resources Total Mineral Resources Tonnes Cu Au Ag Tonnes Cu Au Ag Tonnes Cu Au Ag Tonnes Cu Au Ag (Mt) (%) (g/t) (g/t) (Mt) (%) (g/t) (g/t) (Mt) (%) (g/t) (g/t) (Mt) (%) (g/t) (g/t) Resources at 87 1.59 0.54 4.11 167 1.02 0.36 2.78 254 1.21 0.42 3.24 end 2019 No change Resources at 1 87 1.59 0.54 4.11 167 1.02 0.36 2.78 254 1.21 0.42 3.24 July 2020 Summary of information to support the Mineral Resource and Ore Reserve estimates The following summary information is provided in accordance with Rules 5.8 and 5.9 of the ASX Listing Rules. The appendix to this release provides further detailed information in accordance with the Table 1 checklist in the JORC Code that is material to understanding the estimates of Mineral Resources and Ore Reserves. Geology and geological interpretation The Hugo Dummett deposit is a typical copper–gold porphyry system with associated high-sulphidisation mineralisation. The surface projection of the deposit shows a north-northeast-trending mineralised corridor hosted by an east-dipping sequence of Upper Devonian or older layered volcanics intruded by quartz monzodiorite and granodiorite stocks and dykes. The more typical copper–gold porphyry-style alteration and mineralisation tend to occur in less structurally complex areas, predominantly within basalt and quartz monzodiorite. High-sulphidation mineralisation and associated advanced argillic alteration are most common within the basaltic tuff, in the upper part of the quartz monzodiorite where it intrudes to levels high in the stratigraphic succession, and in narrow structurally-controlled zones. Chalcopyrite and bornite are the main copper sulphide minerals. Interpretations of fault and late barren dykes geometries are areas of greatest uncertainty in the geological model and underground mapping is being used to refine the modelling. Page 2 of 15
Drilling techniques Diamond drilling from surface and underground has been used to drill out the deposit. Holes are generally collared in PQ and size down through HQ and NQ. Holes are generally drilled triple tube to maximise recovery and core quality and to enable pumping of the core direct from the tube to a V-rail for geotechnical logging. As far as possible all diamond core is oriented. Wedging off daughter holes is common from surface and holes are generally drilled from east to west perpendicular to the strike and dip of the deposit. Drill spacing and distribution is considered sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedures and classifications applied. Sampling, sub-sampling method and sample analysis method Half-core (HQ, NQ) or quarter core (PQ) samples taken on continuous 2 m intervals down each drill hole, excluding dykes that extend more than 10 m along the core length. Hanging wall sequence is generally not sampled. Sample preparation protocols for all drill programmes are appropriate for porphyry-style and high- sulphidation deposits, consisting of drying, crushing, splitting, and pulverisation. A 30g sample is analysed for gold using aqua regia followed by fire assay. Samples are also assayed for a multi-element ICP suite and for carbon and sulphur by LECO. Appropriate QA/QC procedures are in place for all assaying. Estimation methodology The deposit has been domained using a combination of structure, geology and copper and gold grade shells. Analysis of contact grade profile plots was used to determine if domain boundaries were treated as soft, firm or hard. Data was composited to 5m. Exploratory data analysis looked at histograms, cumulative frequency plots, descriptive statistics and box plots. Variography was undertaken on composite files using correlograms. Interpolation into 15 x 15 x 15m blocks used ordinary kriging and limited to estimating blocks flagged with a mineralised lithological unit. Outlier restriction and thresholds were used to prevent excessive smearing of high grades. Search ellipsoids were oriented preferentially to the orientation of the grade shells. Validation of the model was done using visual inspection of the results, a nearest neighbour estimate to determine potential bias and through histograms, probability plots and swath plots. Criteria used for classification Mineral Resource classification is based on a combination of drill spacing, visual inspection of geologic and grade continuity, spatial statistics and determination of confidence limits in predicting planned annual production. The majority of Mineral Resources are in the Inferred category with a proportion of Indicated category. Minor Measured category Mineral Resources occur at Hugo Dummett North with the bulk having been converted to Ore Reserves. Only Probable Ore Reserves are reported due to the nature of caving and uncertainty in the geotechnical modifying factors. Economic assumptions Oyu Tolgoi applies consensus pricing in the determination of Ore Reserves and Mineral Resources. This involves generation of long-term price points based on industry capacity analysis, global commodity consumption and economic growth trends. A single long term price point is used in the definition of ore and waste and in the financial evaluations underpinning the Ore Reserves and Mineral Resources statement. The detail of this process and of the price points selected are commercially sensitive and are not disclosed. Mining and recovery factors The Ore Reserve is based on a caving mining method for Hugo Dummett North, a large, highly faulted ore body considered ideal for a caving-based mining method. In the weak, highly stressed ground, a drawpoint spacing of 31 x 18m is planned, utilising El Teniente style, straight drawpoints. The minimum footprint width is 180 metres. The mining zone is sub-blocked into Panel 0, Panel 1 and Panel 2 to reduce risk and increase productivity. Pillars, measuring 120m from undercut to undercut, have been placed in the ore body on either side of Panel 0, to locate and protect the materials handling infrastructure for cave initiation. It is anticipated that part of these pillars will be recovered in the future and the Ore Reserves have been written back to Mineral Resources. The Page 3 of 15
pillar tonnes added to Mineral Resources are larger than those excluded from Ore Reserves because they are reported in situ with no dilution or recovery factors applied. Using a geological hazard risk rating across the mining footprint, drawpoints have been assumed to permanently fail prior to the full economic column being drawn. The early failure of drawpoints reduces the total production and copper tonnes by 11%. The maximum draw column height assumed is 650m; the minimum draw column height is 100m with an average of 366m. Further detailed study on the fragmentation and flow modelling has driven an increase in the drawcone diameter. The larger diameter increases the overall recovery prior to the implementation of mining and recovery factors. The Hugo Dummett North Extension portion of the ore body is not impacted by the Panel 0 pillars, and thus sees an increase in recovery from the larger drawcones. Inferred Mineral Resources are excluded from the Ore Reserve and constitute 5% of the mined material. (The grades of Inferred material are set to zero for production scheduling and the statement of Ore Reserves.) Processing method Once in production, the Hugo Dummett North ore will be processed through the existing crushing, milling and flotation circuit to produce a copper concentrate with gold and silver as byproduct. The metallurgical process is well understood, test work has demonstrated that the ore is well suited to this processing method and the plant has been operating since 2013 to process the open pit ore. Cut-off grades Ore Reserves use Net Smelter Return (NSR) shut off parameters based on 2019 cost estimates. A break-even shut off policy is used to define the draw column heights that includes both mining and processing costs. Footprint extents are determined by a combination of cut-off grade and geotechnical assessment of caveability and maintaining stability. The Mineral Resource estimates use a copper equivalent cut-off grade with the same cost, recovery and price basis as the NSR shut-off grade used for Ore Reserves. Modifying factors Oyu Tolgoi manages five mining licences that cover the project area. Three licences are held 100% by OT LLC (Manakht (Mining Licence 6708A, covering 4,533 ha), Oyu Tolgoi (Mining Licence 6709A, covering 8,490 ha), and Khukh Khad (Mining Licence 6710A, covering 1,763 ha)). Two licences are held by Entrée Gold (Javkhlant (Mining Licence 15225A, covering 20,327 ha) and Shivee Tolgoi (Mining Licence 15226A, covering 42,593 ha)). The Entrée Gold licences are held pursuant to joint venture arrangements between Entrée Gold and Oyu Tolgoi LLC. A Power Source Framework Agreement amendment has been agreed. The amendment prioritises a Government of Mongolia funded State Owned Power Plant, with Oyu Tolgoi having rights to develop its own solution if required and to extend the current IMPC supply contract before 1 March 2021 to ensure no power gap. Concentrate is shipped to China via a road upgraded as part of the original project scope to build the concentrator and bring the Open Pit into production, and which has been in use since 2013. Rio Tinto are not presently aware of any regulatory or approvals impediments that would prevent development of the Hugo Dummett North mine. Page 4 of 15
Competent Persons Statement The information in this release that relates to Ore Reserves is based on information compiled by Ferrin Prince and Mark Bixley, Competent Persons, who are a Member and Fellow respectively of The Australasian Institute of Mining and Metallurgy. Ferrin Prince and Mark Bixley are full-time employees of Rio Tinto. Ferrin Prince and Mark Bixley have sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as Competent Persons as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Each of Ferrin Prince and Mark Bixley consents to the inclusion in the release of the matters based on the information that each of them has prepared in the form and context in which it appears. The information in this release that relates to Mineral Resources is based on information compiled by Oyunjargal Dendev, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Oyunjargal Dendev is a full-time employee of Oyu Tolgoi LLC. Oyunjargal Dendev has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Oyunjargal Dendev consents to the inclusion in the release of the matters based on the information that he has prepared in the form and context in which it appears. Page 5 of 15
Contacts media.enquiries@riotinto.com riotinto.com Follow @RioTinto on Twitter Media Relations, United Kingdom Media Relations, Australia Illtud Harri Jonathan Rose M +44 7920 503 600 T +61 3 9283 3088 M +61 447 028 913 David Outhwaite T +44 20 7781 1623 Matt Chambers M +44 7787 597 493 T +61 3 9283 3087 M +61 433 525 739 Media Relations, Americas Matthew Klar Jesse Riseborough T +1 514 608 4429 T +61 8 6211 6013 M +61 436 653 412 Media Relations, Asia Grant Donald T +65 6679 9290 M +65 9722 6028 Investor Relations, United Kingdom Investor Relations, Australia Menno Sanderse Natalie Worley T: +44 20 7781 1517 T +61 3 9283 3063 M: +44 7825 195 178 M +61 409 210 462 David Ovington Amar Jambaa T +44 20 7781 2051 T +61 3 9283 3627 M +44 7920 010 978 M +61 472 865 948 Group Company Secretary Joint Company Secretary Steve Allen Tim Paine Rio Tinto plc Rio Tinto Limited 6 St James’s Square Level 7, 360 Collins Street London SW1Y 4AD Melbourne 3000 United Kingdom Australia T +44 20 7781 2000 T +61 3 9283 3333 Registered in England Registered in Australia No. 719885 ABN 96 004 458 404 This announcement is authorised for release to the market by Rio Tinto’s Group Company Secretary. Page 6 of 15
Appendix: Hugo Dummett North JORC Table 1 The following table provides a summary of important assessment and reporting criteria used at the Hugo Dummett North deposit for the reporting of Mineral Resources and Ore Reserves in accordance with the Table 1 checklist in The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition). Criteria in each section apply to all preceding and succeeding sections. SECTION 1 SAMPLING TECHNIQUES AND DATA Criteria Commentary Sampling • Half-core (HQ, NQ) or quarter core (PQ) samples taken on continuous 2 m intervals down each drill techniques hole, excluding dykes that extend more than 10 m along the core length. Hanging wall sequence is generally not sampled. • Sample preparation protocols for all drill programmes are appropriate for porphyry-style and high- sulphidation deposits, consisting of drying, crushing, splitting, and pulverisation. • Half core duplicates samples are used to ensure sample representivity. Drilling • Diamond drilling is the primary resource drilling technique used at Hugo Dummett North. Holes are techniques generally collared in PQ and size down through HQ and NQ with rare use of BQ. Holes are generally drilled triple tube to maximise recovery and core quality and to enable pumping of the core direct from the tube to a V-rail for geotechnical logging. • As far as possible all diamond core is oriented. Historically different types of core orientation techniques have been used and currently the ACT II Rapid Descent tool is being used to orient core. Drill sample • Recoveries are measured on the core and compared to driller’s blocks. Recoveries generally recovery average above 96%. • Core is routinely triple tubed to maximise sample recovery and ensure representative nature of the samples as well as providing the best possible geotechnical data. • No recovery based bias has been detected with grade. Logging • All core is geotechnically and geologically logged into standardised templates. The logging is entered directly into laptops at the core shed and is wirelessly synchronised with the geological database. The template includes header information, lithology, alteration, structure, texture, mineralisation, alteration minerals and intensity, and veins. Structural and detailed geotechnical logs are also made. • Magnetic susceptibility readings are taken using Terra Plus at one metre intervals. • Open-hole geophysical borehole logging (incl. acoustic televiewer, full wave sonic, resistivity, natural gamma etc.) is completed in specific drillholes based on their availability. • All core is photographed. Sub-sampling • Core is sawn using an Almonte core saw and half core is sampled with half being returned to the techniques core tray for storage. and sample • Samples are weighted, dried, jaw crushed in two stages to -3.5mm, rotary split to 1kg, pulverised preparation to 90% <75 microns, and split to 180g pulps. • A 30g sample is analysed by SGS-UB for gold using aqua regia followed by fire assay. • ALS-Vancouver had run a multi-element ICP suite and analyses for carbon and sulphur by LECO but since 2016 the same analytical suite has been carried out in ALS-Perth. Quality of • Quality control procedures are used to ensure quality at all stages of sample preparation and assay data and analysis and include certified reference materials, blank samples, sizing tests, duplicate samples laboratory (core/field, crush and pulp), replicate samples and check lab reassays. tests • All QC checks are completed on receipt of assays and individual batches must pass QC tests before they can be imported into the database. • QA/QC processes are also externally audited on an ad hoc basis. • Analysis of the performance of certified standards, duplicates, blanks and check assaying has indicated an acceptable level of precision and accuracy without any significant bias. Page 7 of 15
Verification of • Significant intersections are compiled for internal reporting purposes and use a minimum length of sampling and 50m, a copper equivalent cut-off and maximum internal dilution of ten metres. assaying • All hardcopy records are kept on site in drill hole folders for use in future data verification. Data is generally imported from digital files directly into acQuire database where there are several types of checks to verify the accuracy of the data. • Electronic data is stored on servers on site which are backed up monthly to servers in Ulaanbaatar. Location of • Collars are picked up using theodolite or DGPS and several resurveys have been completed to data points verify the collar locations. • OTGrid is the grid system used although UTM WGS84 co-ordinates are also collected and stored for each drill hole collar. • Holes are guided using a 30m interval single shot Reflex down hole survey instrument. Final down hole surveys are completed using a north seeking gyro tool. Underground intersections have demonstrated the quality of the survey methods. • The most recent topographic survey was completed in 2010 using a total station instrument with 5cm accuracy with results being contoured at 1m. Data spacing • The drill hole spacing over much of the Hugo Dummett North area is approximately 125 m x 75 m. and The data spacing varies with depth but the spacing and distribution is considered sufficient to distribution establish the degree of geological and grade continuity appropriate for the Mineral Resource estimation procedures and classifications applied. • Samples are composited to 5 metres. Orientation of • The primary drilling orientations are perpendicular to strike of the mineralising system and host data in lithologies as far as possible. relation to • This orientation makes identification of some fault sets (eg east-west faults at Hugo North) and the geological geometry of some late dyke sets more difficult. Additional drill holes from surface and structure underground at varying dips and strikes have been drilled to mitigate this risk. Sample • Samples are shipped and tracked in a manner that ensures that tampering could not be done security without detection. Audits or • The most recent reviews of sampling techniques and data by Sketchley (2016), Baker (2010) and reviews Bloom (2013) have led to some minor refinements of the sampling, preparation and analysis of samples. The most significant change was a move to a multi-element ICP suite to provide better quality assays on some minor elements. SECTION 2 REPORTING OF EXPLORATION RESULTS Criteria Commentary Mineral • Oyu Tolgoi manages five mining licences that cover the project area. tenement and • Three licences held 100% by OT LLC are Manakht (Mining Licence 6708A, covering 4,533 ha), Oyu land tenure Tolgoi (Mining Licence 6709A, covering 8,490 ha), and Khukh Khad (Mining Licence 6710A, covering status 1,763 ha). • Two licences held by Entrée Gold are Javkhlant (Mining Licence 15225A, covering 20,327 ha) and Shivee Tolgoi (Mining Licence 15226A, covering 42,593 ha). These are held pursuant to joint venture arrangements between Entrée Gold and Oyu Tolgoi LLC. • Mining license boundaries, along with the surface projection of main deposits and some of the exploration targets, are shown in a plan view below. Page 8 of 15
Exploration • Magma Copper first took licence out over the Oyu Tolgoi area and subsequent exploration was done by other completed by Magma Copper, BHP Billiton and Oyu Tolgoi LLC (formerly Ivanhoe Mines Mongolia parties Inc). Exploration work over a 16 year period took the project from a greenfields site through delineation drilling to published Mineral Resources and Ore Reserves before Rio Tinto’s involvement in the project. Geology • The Oyu Tolgoi deposits display typical copper–gold porphyry and related high-sulphidation copper– gold deposit styles. • The deposits are divided into three zones: the Hugo Dummett zone to the north, the more deeply eroded Oyut deposits (South Oyu, Southwest Oyu and Central Oyu), and to the far south, the buried Heruga deposit. The surface traces and surface projection of the distinct porphyry centres define a north-northeast-trending mineralised corridor hosted by east-dipping panels of Upper Devonian or older layered sequences intruded by quartz monzodiorite and granodiorite stocks and dykes. • Variations apparent in the mineralisation styles, alteration characteristics, and deposit morphologies reflect differences in structural controls, host rock lithology, and depth of formation. • Structural influences account for the most part for the differences in shape, distribution, and potentially the grade of mineralisation within the deposits. • The more typical copper–gold porphyry-style alteration and mineralisation tend to occur in less structurally complex areas, predominantly within basalt and quartz monzodiorite. • High-sulphidation mineralisation and associated advanced argillic alteration are most common within the basaltic tuff, in the upper part of the quartz monzodiorite where it intrudes to levels high in the stratigraphic succession, and in narrow structurally-controlled zones. • A schematic long section along the Oyu Tolgoi deposits (divided into three zones: Hugo Dummett, Oyut and Heruga) from SW to NE is shown below. Page 9 of 15
Drill hole • Cut-off date for the drill hole database for Hugo Dummett North for resource estimation and Mineral Information Resource reporting is the 14th February 2014. Following is a summary for Hugo Dummett North drilling metres by type as of 2019 December 31st. o Surface diamond drilling – 426,100 metres o Underground diamond drilling – 47,772 metres o RC drilling – 5,187 metres o Combined RC and diamond drilling – 3,154 metres o PCD drilling – 3,754 o Total drilling metres – 485,967 metres Data • Not applicable – no exploration results are reported. aggregation methods Relationship • Depending on the dip of the drill hole, and the dip of the mineralisation, drill intercept widths are between typically greater than true widths. Where the geometry of the mineralisation with respect to the drill mineralisatio hole angle is not known it is clearly stated. n widths and intercept lengths Diagrams • Not applicable – no exploration results are reported. Balanced • Not applicable – no exploration results are reported. reporting Other • Not applicable – no exploration results are reported. substantive exploration data Further work • Since completion of the resource estimate in 2014 the bulk of geological activities on site have been underground mapping of lateral development drives and geotechnical drilling in support of mine construction activities. This work is ongoing and is being used to inform mine designs. SECTION 3 ESTIMATION AND REPORTING OF MINERAL RESOURCES Criteria Commentary Database • Extensive data quality assurance procedures are in place to ensure the data is as accurate as integrity possible. • Detailed quality control and validation of all new data is undertaken before it is used in a Mineral Resource estimate. Page 10 of 15
• Much of the data collection is now digital with remote uploading of data directly into acQuire. There are validation settings on most fields in acQuire. • Assay data is QA/QC assessed in acQuire before final release in the database. Basic and detailed checks are completed on all fundamental data and range from extent checks to checking individual assays against the hardcopy records. Detailed reports of all validation and QA/QC checks are available. Site visits • The Competent Person – Mineral Resources, Oyunjargal Dendev, is a full time employee of Oyu Tolgoi LLC. The Competent Person visits the mine site regularly. Geological • Drill core logging is of fundamental importance to geological interpretation and many layers of interpretation quality assurance are in place to ensure high quality logging information ranging from acQuire data entry checks and daily senior geologist checks of logging to peer reviews of drill hole logging on completion of drilling. • Infill drilling from surface, underground mapping and drilling, relogging of drill holes and new structural interpretations have all been used to improve the confidence in the structural and geological models at Hugo North over the last 10 years. • The structural and geology model form the basis of geotechnical assessments and the domaining used in resource estimation. • The greatest risk factors to the geology models are the structural interpretation and the geometry and extents of late barren dykes. Dimensions • The dimensions of the Hugo Dummett North deposit are a vertical extent of about 900 metres from +500 metres above sea level to depths greater than 400 metres below sea level. Along the strike, it extends in excess of 1,800 metres with width of 500 metres. Estimation • The deposit has been domained using a combination of structure, geology and copper and gold and modelling grade shells. Analysis of contact grade profile plots was used to determine if domain boundaries techniques were treated as soft, firm or hard. • Data was composited to 5m. • Exploratory data analysis looked at histograms, cumulative frequency plots, descriptive statistics and box plots. • Variography was undertaken on composite files using correlograms. • Interpolation into 15x15x15m blocks used ordinary kriging and limited to estimating blocks flagged with a mineralised lithological unit. Outlier restriction and thresholds were used to prevent excessive smearing of high grades. Search ellipsoids were oriented preferentially to the orientation of the grade shells. • Validation of the model was done using visual inspection of the results, a nearest neighbour estimate to determine potential bias and through histograms, probability plots and swath plots. Moisture • All tonnages are calculated on the basis of dry bulk density measurements taken on drill core at intervals of 10m. Cut-off • A cut-off grade of 0.41% copper equivalence has been used in stating underground Mineral parameters Resources at Hugo Dummett North. Following is a summary of copper equivalence assumptions used for defining the copper equivalence formula. • The formula is calculated on individual block grades for copper, gold and silver. • Oyu Tolgoi applies consensus pricing in the determination of reserves and resources. This involves generation of long-term price points based on industry capacity analysis, global commodity consumption and economic growth trends. A single long term price point is used in the definition of ore and waste and in the financial evaluations underpinning the reserves and resources statement. The detail of this process and of the price points selected are commercially sensitive and are not disclosed. • Average recoveries are 93% for copper, 80% for gold and 81% for silver. • It is Rio Tinto’s opinion that all the elements included in the metal equivalents calculation have a reasonable potential to be recovered and sold. • Based on above the assumptions the copper equivalence formula is: CuEq = Cu+((Au*AuPrice*0.03215*AuRec/CuRec)+(Ag*AgPrice*0.03215* Page 11 of 15
AgRec/CuRec))/(CuPrice*22.0462) Mining factors • The first stage of the Hugo Dummett North underground development is the Lift 1 cave mine. or • It is assumed that subsequent resource development will also utilise the caving underground assumptions mining method and this is the basis of reporting for Hugo Dummett North. Metallurgical • Metallurgical assumptions have been made on the basis of comminution (throughput) and flotation factors or (recovery) metallurgical test work at Hugo Dummett North. assumptions Environmental • Tailings from the operation will be potentially acid forming and will be stored in the appropriately factors or tailings storage facility to ensure no long term acid rock drainage issues. assumptions Bulk density • Dry bulk density is determined by calliper and immersion techniques for 20 cm lengths of core, sampled every ten metres down drill holes. Porous samples are measured with a paraffin wax coating. There is an extensive database of density measurements for the Hugo Dummett North deposit and its variations in lithology, alteration and mineralisation. • The dry bulk density measurements are used to estimate density (tonnes) in the block models and use simple kriging estimation methods. Classification • The majority of Mineral Resources are in the Inferred category with a proportion of Indicated category. Minor Measured category resources occur at Hugo Dummett North with the bulk having been converted to Ore Reserves. • Classification is based on a combination of drill spacing, visual inspection of geologic and grade continuity, spatial statistics and determination of confidence limits in predicting planned annual production. • Block confidence classification is based on three operations: preliminary block classification using a script based on distance to a drill hole and number of drill holes used to estimate a block, generation of probability model for the three confidence categories, and manual cleaning using polygons generated in sectional view. • A three-pass inverse distance squared (ID2) estimation of copper composites was used to capture the distance from a block centroid to the nearest composites; the closest anisotropic distance was captured from Pass 1 and Pass 2, and the closest Cartesian distance was captured from Pass 3. • A series of probability models were generated using the preliminary classification code of 1 for Measured, 2 for Indicated, and 3 for Inferred. Using a threshold value of 50%, the probability shells were compared to the preliminary classification block code. Boundary polygons reflecting the three categories were then manually digitized to eliminate the inclusion of isolated blocks and incorporate geologic and grade continuity. The probability shells were used as a guide for confidence. The polygons were then connected to create a three-dimensional solid. Blocks were then recoded as Measured, Indicated, or Inferred based on these solids. • For Measured Resources a three-hole rule was used for OK-estimated copper blocks with three or more composites from three different holes, from three different search octants, all within 50 m and at least one composite within 35 m of the block centroid. The distance used is the closest anisotropic distance captured from ID2 Pass 1. Blocks were constrained by the Measured classification solid generated using sectional interpretation and block probabilities. • For Indicated Resources the following criteria need to be met. A three-hole rule was used for OK- estimated copper blocks not classified as Measured and with three or more composites from three different holes, all within 50 m. The distance used is the closest anisotropic distance captured from ID2 Pass 1. A three-hole rule was used for OK-estimated copper blocks with three or more composites from three different holes, all within 150 m and at least one composite within 105 m of the block centroid, all distances from ID2 Pass 2. A two-hole rule was used for OK-estimated copper blocks with two or more composites from two different holes, all within 150 m with at least one hole within 75 m of the block centroid, all distances from ID2 Pass 2. Blocks were constrained by the Indicated classification solid generated using sectional interpretation and block probabilities. • All blocks in the Hugo North model with an OK-estimated copper grade that did not meet the Page 12 of 15
classification criteria for Measured or Indicated Mineral Resources were assigned to Inferred Mineral Resources if the block centroid was within 150 m of a composite. The distance used is the closest Cartesian distance captured from Pass 3 of the ID2 estimation described above. Blocks were constrained by the inferred classification solid generated using sectional interpretation and block probabilities. • The Competent Person is satisfied that the stated Mineral Resource classification reflects the relevant factors of the deposit. Audits or • Mineral Resource estimates have been audited by SRK acting for Rio Tinto Risk Assurance in 2012 reviews and 2013 and received a Satisfactory rating in 2013. • Mineral Resource estimates were also considered in an internal audit on Production Reporting and Reconciliation in 2013 and received a Satisfactory rating. • No high rated findings were made in any of the above audits and the majority of findings had a low rating. • All stages of resource estimation have undergone an external review process and endorsement. Discussion of • Oyu Tolgoi operates the nearby Oyut open pit mine. The data collection and estimation techniques relative used for the Hugo Dummett deposit are consistent with those used at Oyut. Reconciliation of accuracy/ actual production with the Mineral Resource estimates for the Oyut deposit is generally accurate to confidence within ten per cent for tonnes and grade on an annual basis. This result is indicative of a robust process. • The accuracy and confidence of the Mineral Resource estimate is consistent with the current level of study (Feasibility Study). SECTION 4 ESTIMATION AND REPORTING OF UNDERGROUND ORE RESERVES Criteria Commentary Mineral • 2014 Mineral Resource is the basis for Hugo Dummett North Ore Reserves. Resource • Ore Reserves are reported exclusive of Mineral Resources. estimate for conversion to Ore Reserves Site visits • In 2019, the Competent Person visited site 3 times and works full time on the life of mine planning team for the Oyu Tolgoi Mine. The Competent Person has access to senior leaders to raise and discuss pertinent issues. Study status • Feasibility Study completed in 2015 (to be updated during 2020) and detailed design ongoing for project execution. Further detailed studies were completed on the design of the cave initiation area (Panel 0) in 2020. Cut-off • Shut off parameters are based on 2019 cost estimate outputs. A break-even shut off policy is used parameters to define the draw column heights. Footprint extents are determined by a combination of cut-off grade and geotechnical assessment of caveability and maintaining stability. Mining factors • The Ore Reserve is based on a caving mining method for Hugo Dummett North, a large, highly or faulted ore body considered ideal for a caving-based mining method. In the weak, highly stressed assumptions ground, a drawpoint spacing of 31 x 18m is planned, utilising El Teniente style, straight drawpoints. The minimum footprint width is 180 metres. • The mining zone is sub-blocked into Panel 0, Panel 1 and Panel 2 to reduce risk and increase productivity. Pillars, measuring 120m from undercut to undercut, have been placed in the ore body on either side of Panel 0, to locate and protect the materials handling infrastructure for cave initiation. Using a geological hazard risk rating across the mining footprint, drawpoints have been assumed to permanently fail prior to the full economic column being drawn. The early failure of drawpoints reduces the total production and copper tonnes by 11%. • The maximum draw column height assumed is 650m; the minimum draw column height is 100m with an average of 366m. Further detailed study on the fragmentation and flow modelling has driven an increase in the drawcone diameter. The larger diameter increases the overall recovery Page 13 of 15
prior to the implementation of mining and recovery factors. The Hugo Dummett North Extension portion of the ore body is not impacted by the Panel 0 pillars, and thus sees an increase in recovery from the larger drawcones. • Inferred mineral resources are excluded from the Ore Reserve and constitute 5% of the mined material (The grades of Inferred material are set to zero for production scheduling and the statement of Ore Reserves). Metallurgical • Sulphide copper flotation with gold and silver in copper concentrate is proposed for treatment of factors or the Hugo Dummett North orebody. assumptions • The metallurgical process is well understood, test work has demonstrated that the ore is well suited to this processing method and the plant has been constructed with first concentrate in 2013 from the open pit feed. • Diamond drill core comminution and flotation test results were utilised to develop metallurgical models representing different metallurgical domains that were considered representative of the orebody. The metallurgical models predict product tonnage and grade parameters including deleterious elements. Environmental • A small underground development waste stockpile is planned and any potentially acid forming material will be placed in an environmentally appropriate way within the open pit approved dumping sites and plans. • Tailings from the operation will be potentially acid forming and will be stored in the appropriately tailings storage facility to ensure no long term acid rock drainage issues. Infrastructure • Leases in place with development approval. • Camp and roads in place • A power line from China is in place. A Power Source Framework Agreement amendment has been agreed. The amendment prioritises a Governement Of Mongolia funded State Owned Power Plant, with Oyu Tolgoi having rights to develop its own solution if required and to extend current IMPC supply contract before 01 March 2021 to ensure no power gap. • Water sources secured for the existing 100 ktpd plant • Road to China upgraded for freight and concentrate shipping • Nominal 100 ktpd concentrator commissioned and operating with open pit feed since 2013 Costs • Capital costs are based on actuals and detailed projections through the project period. • Operating costs have been built up from material take offs based on the detailed mine design and operating plan • Deleterious element penalties for arsenic and fluorine are applied in the business model. The blend of open pit and underground material is designed to keep mill feed below rejection limits during periods of higher arsenic production from the open pit. • Transportation and refining charges are based on contracts in place • Royalties based on a formal government agreement. Revenue • Net Smelter Return is based on the recovery formulas developed by qualified metallurgists from factors test work on the Hugo Dummett North ore and excludes penalties for deleterious elements. It includes TC/RCs, Government royalty, and limits on payable Gold/Silver along with conventional payable copper logic • Oyu Tolgoi applies consensus pricing in the determination of reserves and resources. This involves generation of long-term price points based on industry capacity analysis, global commodity consumption and economic growth trends. A single long term price point is used in the definition of ore and waste and in the financial evaluations underpinning the reserves and resources statement. The detail of this process and of the price points selected are commercially sensitive and are not disclosed. Market • The long term outlook for copper is positive. assessment • A marketing plan has been completed and is part of the Feasibility Study documentation • Concentrate is currently shipped to China via the nearby border crossing. Economic • Rio Tinto makes an assessment of an appropriate country-specific discount rate to use and this rate is applied in the business’ financial model. Page 14 of 15
• The Hugo Dummett North cave is a robust project which shows positive NPV under a number of sensitivity cases on prices, costs and production outcomes. Social • There is a formal agreement with the Mongolian government. Other • A full project risk assessment has been completed. • An agreement with the government is in place. • The underground operation is currently being developed. Classification • Only material classified as having a Measured or Indicated level of resource confidence is considered as mineralised in the evaluation of mining plans that underpin the stated Ore Reserves. • 100% of Ore Reserves are reported as Probable Ore Reserves due to the nature of caving and uncertainty in the geotechnical modifying factors. Audits or • A Rio Tinto Reserve audit was conducted in July 2013 using external reviewers. There were no high reviews risk outcomes from the audit. CAMs reviewers associated with project finance reviewed the project in 2020 and have an ongoing monitoring role comprising quarterly site visits. Discussion of • The mine is under development therefore no reconciliation data is available for calibration. relative • Industry-accepted parameters for dilution are applied, however Hugo Dummett North is a highly accuracy/ fractured orebody and dilution could be higher than expected. Work is ongoing in this area. confidence • High abutment stresses may impact drawpoint availability and cost. In the event where a damaged drawpoint cannot be recovered, some reserve loss could be experienced. These Ore Reserves contain an allowance for permanent drawpoint loss. • The Hugo Dummett North cave is a financially robust project, consequently higher than expected dilution or drawpoint loss is not expected to make the project unattractive for investment. Sensitivity cases have confirmed this expectation. Page 15 of 15
Exhibit 99.4 Notice to ASX/LSE NZAS terminates electricity contract and plans to wind-down operations following strategic review 9 July 2020 Rio Tinto will start planning for the wind-down of operations and the eventual closure of New Zealand Aluminium Smelters (NZAS) following the conclusion of its strategic review which has shown the business is no longer viable given high energy costs and a challenging outlook for the Aluminum industry. As a result, NZAS has given Meridian Energy notice to terminate the power contract, which will end in August 2021, when the wind-down of operations is expected to complete. The strategic review concluded that the smelter, which has made Rio Tinto an underlying loss of NZ$46m in 2019, is not economically viable due to energy costs that are some of the highest in the industry globally, coupled with a challenging short to medium term aluminum outlook. Extensive discussions with a wide range of interested parties have failed to secure a power contract that will enable the operation to become both competitive and profitable. During the next 14 months, NZAS and Rio Tinto will work closely with partners as detailed planning is undertaken to wind-down operations, and eventually close the smelter. Rio Tinto Aluminium chief executive Alf Barrios said “We recognise the decision to wind-down operations at NZAS will have a significant impact on employees, the community and our customers. “It is not a decision we have made lightly and without significant careful consideration. It is very unfortunate we could not find a solution with our partners to secure a power price reduction aimed at making NZAS a financially viable business. We will therefore terminate the power contract and move to close the operation. “We are committed to working with our partners as we progress through detailed planning towards closure and we will do all we can together with the government to find ways to support the Southland community.” NZAS is a joint venture between Rio Tinto (79.36%) and Sumitomo Chemical Company Limited (20.64%). It employs around 1000 people directly and creates a further 1600 indirect jobs in Southland. Page 1 of 2
Contacts media.enquiries@riotinto.com riotinto.com Follow @RioTinto on Twitter Media Relations, United Kingdom Media Relations, Australia and New Zealand Illtud Harri Jonathan Rose M +44 7920 503 600 T +61 3 9283 3088 M +61 447 028 913 David Outhwaite T +44 20 7781 1623 Matt Chambers M +44 7787 597 493 T +61 3 9283 3087 M +61 433 525 739 Media Relations, Americas Matthew Klar Jennifer Nolan T +1 514 608 4429 T +64 4 9161496 M +64 213 819 81 Media Relations, Asia Grant Donald T +65 6679 9290 M +65 9722 6028 Investor Relations, United Kingdom Investor Relations, Australia Menno Sanderse Natalie Worley T: +44 20 7781 1517 T +61 3 9283 3063 M: +44 7825 195 178 M +61 409 210 462 David Ovington Amar Jambaa T +44 20 7781 2051 T +61 3 9283 3627 M +44 7920 010 978 M +61 472 865 948 Clare Peever M: +44 7788 967 877 Group Company Secretary Joint Company Secretary Steve Allen Tim Paine Rio Tinto plc Rio Tinto Limited 6 St James’s Square Level 7, 360 Collins Street London SW1Y 4AD Melbourne 3000 United Kingdom Australia T +44 20 7781 2000 T +61 3 9283 3333 Registered in England Registered in Australia No. 719885 ABN 96 004 458 404 This announcement is authorised for release to the market by Rio Tinto’s Group Company Secretary. Page 2 of 2
Exhibit 99.5
Notice to ASX/LSE

Shareholdings of directors and persons discharging managerial responsibility (PDMR)
21 July 2020
As part of its dual listed company structure, Rio Tinto notifies dealings in Rio Tinto plc and Rio Tinto Limited securities by PDMRs to both the Australian Securities Exchange (ASX) and the London Stock Exchange (LSE).
Global Employee Share Plan (myShare)
Under myShare employees are able to purchase, on a quarterly basis, Rio Tinto plc ordinary shares of 10p each, Rio Tinto plc ADRs or Rio Tinto Limited ordinary shares (‘shares’). Shares are purchased out of monthly deductions from salary, and participants are allocated an equivalent number of shares or ADRs free of charge (‘matching shares’ and ‘matching ADRs’), conditional upon satisfying the terms of myShare.
The following PDMRs acquired Rio Tinto shares or ADRs under myShare and were allocated the same number of matching share awards or matching ADR awards as follows:
| Security | Name of PDMR | Number of shares or ADRs | Matching shares or matching ADRs | Price per share or ADR | Date of transaction | ||||||||||||
| Rio Tinto plc shares | Baatar, Bold | 7.6392 | 7.6392 | 49.0889 GBP | 17/07/2020 | ||||||||||||
| Rio Tinto plc shares | Barrios, Alfredo | 15.1716 | 15.1716 | 49.0889 GBP | 17/07/2020 | ||||||||||||
| Rio Tinto plc shares | Soirat, Arnaud | 7.6392 | 7.6392 | 49.0889 GBP | 17/07/2020 | ||||||||||||
| Rio Tinto plc shares | Stausholm, Jakob | 7.6392 | 7.6392 | 49.0889 GBP | 17/07/2020 | ||||||||||||
UK Share Plan (UKSP)
The UKSP is an HMRC approved Share Incentive Plan under which qualifying UK employees are able to purchase, on a quarterly basis, Rio Tinto plc shares. Rio Tinto plc shares are purchased out of monthly deductions from salary, and participants are allocated an equivalent number of shares free of charge (UKSP matching shares). Qualifying UK employees are also awarded Free Shares once a year.
The following PDMRs purchased Rio Tinto plc shares under the UKSP and were allocated the same number of matching shares as follows:
Page 1 of 2
| Security | Name of PDMR | Number of Shares Acquired | Matching shares | Price per Share GBP | Date of transaction | ||||||||||||
| Rio Tinto plc shares | Baatar, Bold | 8 | 8 | 49.0889 GBP | 17/07/2020 | ||||||||||||
Rio Tinto plc shares | Jacques, Jean-Sébastien | 1 | 1 | 49.0889 GBP | 17/07/2020 | ||||||||||||
| Rio Tinto plc shares | Soirat, Arnaud | 8 | 8 | 49.0889 GBP | 17/07/2020 | ||||||||||||
| Rio Tinto plc shares | Stausholm, Jakob | 8 | 8 | 49.0889 GBP | 17/07/2020 | ||||||||||||
FCA notifications in accordance with the EU Market Abuse Regulation have been issued to the London Stock Exchange contemporaneously with this release.
LEI: 213800YOEO5OQ72G2R82
Classification: 3.1. Information disclosed under article 19 of the Market Abuse Regulation.
This announcement is authorised for release to the market by Rio Tinto’s Group Company Secretary.
Steve Allen Group Company Secretary | Tim Paine Joint Company Secretary | ||||
Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885 | Rio Tinto Limited Level 7, 360 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404 | ||||
Page 2 of 2
Exhibit 99.6
Media Release

Rio Tinto files complaint with Icelandic Competition Authority over ISAL smelter power agreement
22 July 2020
LONDON--(BUSINESS WIRE)-- Rio Tinto has today submitted a formal complaint to the Icelandic Competition Authority (ICA) alleging abuse of market dominance by Landsvirkjun, the energy supplier to Rio Tinto’s ISAL aluminium smelter in Iceland.
Rio Tinto is asking the ICA to address anti-competitive conduct by Landsvirkjun through discriminatory pricing and long-duration power contracts, so that the ISAL smelter and other Icelandic manufacturing and businesses are able to compete internationally.
Rio Tinto Aluminium chief executive Alf Barrios said “Landsvirkjun’s abuse of its dominant position in the Icelandic energy market needs to be addressed or Iceland is in danger of losing export industries with major employment like ISAL. ISAL pays significantly more for its energy than other aluminium producers in Iceland, which undermines its competitive position in the market. We cannot continue to produce aluminium in Iceland if the power pricing system is not transparent, fair and internationally competitive. In the meantime, our teams at ISAL will continue to focus on safely reducing cost, improving productivity and delivering on our commitments to customers.”
Rio Tinto’s complaint alleges that pricing terms of the power agreement with Landsvirkjun are discriminatory, abuse its market dominant position and cannot be justified. Landsvirkjun’s supply contracts bind customers to long-duration terms, rendering it impossible for alternative energy suppliers to either enter the Icelandic market or expand operations.
Rio Tinto has actively engaged with Landsvirkjun this year in an attempt to ensure a sustainable future for the smelter and the 500 people that work there. Despite numerous efforts to constructively engage, Rio Tinto has concluded that Landsvirkjun is not ready to provide electricity purchase conditions that will allow ISAL to become sustainable and competitive, and to address its abusive and discriminatory conduct.
Rio Tinto announced a strategic review of the ISAL smelter on 12 February 2020. Rio Tinto is concluding the first phase of the strategic review with the filing of the ICA complaint. If Landsvirkjun does not address its abusive conduct, ISAL will have no choice but to consider termination of its energy contract and commence planning for orderly closure of the smelter.
Contacts
media.enquiries@riotinto.com
riotinto.com
Follow @RioTinto on Twitter
Media Relations, United Kingdom Illtud Harri M +44 7920 503 600 David Outhwaite T +44 20 7781 1623 M +44 7787 597 493 Media Relations, Americas Matthew Klar T +1 514 608 4429 Media Relations, Asia Grant Donald T +65 6679 9290 M +65 9722 6028 | Media Relations, Australia Jonathan Rose T +61 3 9283 3088 M +61 447 028 913 Matt Chambers T +61 3 9283 3087 M +61 433 525 739 Jennifer Nolan T +64 4 9161496 M +64 213 819 81 | ||||
Investor Relations, United Kingdom Menno Sanderse T: +44 20 7781 1517 M: +44 7825 195 178 David Ovington T +44 20 7781 2051 M +44 7920 010 978 Clare Peever T +44 7788 967 877 | Investor Relations, Australia Natalie Worley T +61 3 9283 3063 M +61 409 210 462 Amar Jambaa T +61 3 9283 3627 M +61 472 865 948 | ||||
Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885 | Rio Tinto Limited Level 7, 360 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404 | ||||
Exhibit 99.7
Notice to ASX/LSE

Shareholdings of directors and persons discharging managerial responsibility (PDMR)
23 July 2020
As part of its dual listed company structure, Rio Tinto notifies dealings in Rio Tinto plc and Rio Tinto Limited securities by PDMRs to both the Australian Securities Exchange (ASX) and the London Stock Exchange (LSE).
Global Employee Share Plan (myShare)
Under myShare employees are able to purchase, on a quarterly basis, Rio Tinto plc ordinary shares of 10p each, Rio Tinto plc ADRs or Rio Tinto Limited ordinary shares (‘shares’). Shares are purchased out of monthly deductions from salary and participants are allocated an equivalent number of shares or ADRs free of charge (‘matching shares’ and ‘matching ADRs’), conditional upon satisfying the terms of myShare. The matching shares or matching ADRs are subject to a three year holding period, and vest after this period.
Upon vesting, on 17 July 2020, the following PDMR received matching shares or matching ADRs under myShare, of which sufficient were sold on 21 July 2020 to pay applicable withholding tax and other deductions.
| Security | Name of PDMR | No: of Matching Shares Granted | No: of Shares Vested* | No: of Shares Sold | Price per Share Sold | No: of Shares Retained | ||||||||||||||
| Rio Tinto plc shares | Baatar, Bold | 21.4249 | 26.0397 | 10.9368 | 48.062758GBP | 15.1029 | ||||||||||||||
| Rio Tinto plc shares | Barrios, Alfredo | 21.2056 | 25.7729 | 12.3165 | 48.062758GBP | 13.4564 | ||||||||||||||
Rio Tinto plc shares | Jacques, Jean-Sébastien | 10.7124 | 13.0193 | 5.4681 | 48.062758GBP | 7.5512 | ||||||||||||||
| Rio Tinto Limited shares | Trott, Simon | 21.1754 | 25.0980 | N/A | N/A | 25.0980 | ||||||||||||||
*The number of shares vested includes additional shares calculated to reflect dividends declared during the vesting period on the original shares granted, in accordance with the plan rules.
FCA notifications in accordance with the EU Market Abuse Regulation have been issued to the London Stock Exchange contemporaneously with this release.
LEI: 213800YOEO5OQ72G2R82
Classification: 3.1. Information disclosed under article 19 of the Market Abuse Regulation.
This announcement is authorised for release to the market by Rio Tinto’s Group Company Secretary.
Steve Allen Group Company Secretary | Tim Paine Joint Company Secretary | ||||
Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885 | Rio Tinto Limited Level 7, 360 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404 | ||||
Page 2 of 2
Exhibit 99.8 This appendix is not available as an online form Please fill in and submit as a PDF announcement +Rule 3.10.3A, 3.10.3B, 3.10.3C Appendix 3G Notification of issue, conversion or payment up of equity +securities Information or documents not available now must be given to ASX as soon as available. Information and documents given to ASX become ASX’s property and may be made public. If you are an entity incorporated outside Australia and you are issuing a new class of +securities other than CDIs, you will need to obtain and provide an International Securities Identification Number (ISIN) for that class. Further information on the requirement for the notification of an ISIN is available from the Create Online Forms page. ASX is unable to create the new ISIN for non-Australian issuers. *Denotes minimum information required for first lodgement of this form, with exceptions provided in specific notes for certain questions. The balance of the information, where applicable, must be provided as soon as reasonably practicable by the entity. Part 1 – Entity and announcement details Question Question Answer no 1.1 *Name of entity Rio Tinto Limited We (the entity here named) give notice of the issue, conversion or payment up of the following unquoted +securities. 1.2 *Registration type and number 96 004 458 404 Please supply your ABN, ARSN, ARBN, ACN or another registration type and number (if you supply another registration type, please specify both the type of registration and the registration number). 1.3 *ASX issuer code RIO 1.4 *This announcement is ☒ A new announcement Tick whichever is applicable. ☐ An update/amendment to a previous announcement ☐ A cancellation of a previous announcement 1.5 *Date of this announcement 24 July 2020 + See chapter 19 for defined terms 31 January 2020 Page 1
This appendix is not available as an online form Appendix 3G Please fill in and submit as a PDF announcement Notification of issue, conversion or payment up of equity +securities Part 2 – Type of issue Question Question Answer No. 2.1 *The +securities the subject of this ☐ +Securities issued as a result of options notification are: being exercised or other +convertible Select whichever item is applicable. +securities being converted and that are If you wish to notify ASX of different types of issues of not to be quoted on ASX securities, please complete a separate Appendix 3G ☐ for each type of issue. Partly paid +securities that have been fully paid up and that are not to be quoted on ASX ☒ +Securities issued under an +employee incentive scheme that are not being immediately quoted on ASX ☐ Other [please specify] If you have selected ‘other’ please provide the circumstances of the issue here: 2.2a.1 Please state the number and type of 93,898 conditional rights (Matching Share +securities (including their ASX security Rights) to Rio Tinto Limited ordinary shares code) issued under an +employee (Shares) under the Rio Tinto Limited Global incentive scheme that are not being Employee Share Plan (myShare). immediately quoted on ASX (These Matching Share Rights were issued Answer this question if your response to Q2.1 is simultaneously with the purchase of 93,898 “securities issued under an employee incentive Shares under myShare ( scheme that are not being immediately quoted on Investment ASX”. Shares).) 2.2c.2 *Please attach a document or provide myShare Plan Rules attached details of a URL link for a document lodged with ASX detailing the terms of the +employee incentive scheme or a summary of the terms. Answer this question if your response to Q2.1 is “securities issued under an employee incentive scheme that are not being immediately quoted on ASX”. 2.2c.3 *Are any of these +securities being issued Yes to +key management personnel (KMP) or an +associate Answer this question if your response to Q2.1 is “securities issued under an employee incentive scheme that are not being immediately quoted on ASX”. + See chapter 19 for defined terms 31 January 2020 Page 2
This appendix is not available as an online form Appendix 3G Please fill in and submit as a PDF announcement Notification of issue, conversion or payment up of equity +securities 2.2c.3.a *Provide details of the recipients and the number of +securities issued to each of them. Answer this question if your response to Q2.1 is “securities issued under an employee incentive scheme that are not being immediately quoted on ASX” and your response to Q2.2c.3 is “Yes”. Repeat the detail in the table below for each KMP involved in the issue. If the securities are being issued to the KMP, repeat the name of the KMP or insert “Same” in “Name of registered holder”. If the securities are being issued to an associate of a KMP, insert the name of the associate in “Name of registered holder”. Name of KMP Name of registered holder Number of +securities Stephen McIntosh Computershare Trustees - 13.4281 Matching (Jersey) Limited on behalf of Share Rights under Mr McIntosh myShare - (These Matching Share Rights were issued simultaneously with the purchase of 13.4281 Investment Shares under myShare.) 2.3 *The +securities being issued are: ☒ Additional +securities in an existing Tick whichever is applicable unquoted class that is already recorded by ASX ("existing class") ☐ New +securities in an unquoted class that is not yet recorded by ASX ("new class") Part 3A – number and type of +securities being issued (existing class) Answer the questions in this part if your response to Q2.3 is “existing class”. Question Question Answer No. 3A.1 *ASX security code & description RIOAL 3A.2 *Number of +securities being issued 93,898 Matching Share Rights under myShare - (These Matching Share Rights were issued simultaneously with the purchase of 93,898 Investment Shares under myShare.) 3A.3a *Will the +securities being issued rank Yes equally in all respects from their issue date with the existing issued +securities in that class? + See chapter 19 for defined terms 31 January 2020 Page 3
This appendix is not available as an online form Appendix 3G Please fill in and submit as a PDF announcement Notification of issue, conversion or payment up of equity +securities Part 4 – Issue details Question Question Answer No. 4.1 *Have the +securities been issued yet? Yes 4.1a *What was their date of issue? 17 July 2020 Answer this question if your response to Q4.1 is “Yes”. 4.2 *Are the +securities being issued for a No cash consideration? If the securities are being issued for nil cash consideration, answer this question “No”. 4.2c Please describe the consideration being Nil consideration under the terms of provided for the +securities myShare Answer this question if your response to Q4.2 is “No”. + See chapter 19 for defined terms 31 January 2020 Page 4
This appendix is not available as an online form Appendix 3G Please fill in and submit as a PDF announcement Notification of issue, conversion or payment up of equity +securities Part 5 – Unquoted +securities on issue Following the issue of the +securities the subject of this application, the unquoted issued +securities of the entity will comprise: Note: the figures provided in the table in section 5.1 below are used to calculate part of the total market capitalisation of the entity published by ASX from time to time. Please make sure you include in the table each class of unquoted securities issued by the entity. Restricted securities should be included in table 5.1. 5.1 *ASX security code and description *Total number of +securities on issue Matching Share Rights granted under myShare 941,0681 Rights to Shares granted by way of Bonus 128,1462 Deferral Awards under the Rio Tinto Limited Equity Incentive Plan (EIP) 3 Rights to Shares granted under the Rio Tinto 1,509,515 Limited Performance Share Plan, or by way of Performance Share Awards under the EIP 4 Rights to Shares granted under the Rio Tinto 1,257,173 Limited Management Share Plan, or by way of Management Share Awards under the EIP Special Voting Share5 1 DLC Dividend Share6 1 1 This includes an adjustment of -85,444 Matching Share Rights to the total number of Matching Share Rights disclosed in the Appendix 3G submitted on 24 April 2020, as a result of lapses of rights, vesting of rights, and adjustments to the number of rights upon vesting for the value of dividends which would have accrued on the unvested entitlements had they been fully vested on the award date. All vestings are satisfied by way of on-market purchases. 2 This includes an adjustment of -3,674 Rights to Shares to the total number of Rights to Share disclosed in the Appendix 3G submitted on 24 April 2020, as a result of lapses of rights, vesting of rights, and adjustments to the number of rights upon vesting for the value of dividends which would have accrued on the unvested entitlements had they been fully vested on the award date. All vestings are satisfied by way of on-market purchases. 3 This includes an adjustment of -93,004 Rights to Shares to the total number of Rights to Share disclosed in the Appendix 3G submitted on 24 April 2020, as a result of lapses of rights, vesting of rights, and adjustments to the number of rights upon vesting for the value of dividends which would have accrued on the unvested entitlements had they been fully vested on the award date. All vestings are satisfied by way of on-market purchases. 4 This includes an adjustment of -25,982 Rights to Shares to the total number of Rights to Share disclosed in the Appendix 3G submitted on 24 April 2020, as a result of lapses of rights, vesting of rights, and adjustments to the number of rights upon vesting for the value of dividends which would have accrued on the unvested entitlements had they been fully vested on the award date. All vestings are satisfied by way of on-market purchases. 5 The ‘Special Voting Share’ was issued to facilitate the joint voting by shareholders of Rio Tinto Limited and Rio Tinto plc on Joint Decisions following the Dual Listed Company (DLC) merger. 6 The ‘DLC Dividend Share’ was issued to facilitate the efficient management of funds within the DLC structure. + See chapter 19 for defined terms 31 January 2020 Page 5
This appendix is not available as an online form Appendix 3G Please fill in and submit as a PDF announcement Notification of issue, conversion or payment up of equity +securities Part 6 – Other Listing Rule requirements The questions in this Part should only be answered if you are an ASX Listing (ASX Foreign Exempt Listings and ASX Debt Listings do not need to complete this Part) and: - your response to Q2.1 is “+securities issued under an +employee incentive scheme that are not being immediately quoted on ASX”; or - your response to Q2.1 is “Other” Question Question Answer No. 6.1 *Are the securities being issued under No Listing Rule 7.2 exception 131 and therefore the issue does not need any security holder approval under Listing Rule 7.1? Answer this question if your response to Q2.1 is “securities issued under an employee incentive scheme that are not being immediately quoted on ASX”. 6.2 *Has the entity obtained, or is it obtaining, No +security holder approval for the issue under listing rule 7.1? Answer this question if the response to Q6.1 is “No”. 6.2b *Are any of the +securities being issued Yes without +security holder approval using the entity’s 15% placement capacity under listing rule 7.1? Answer this question if the response to Q6.1 is “No” and the response to Q6.2 is “No”. 1 Exception 13 An issue of securities under an employee incentive scheme if within 3 years before the issue date: (a) in the case of a scheme established before the entity was listed – a summary of the terms of the scheme and the maximum number of equity securities proposed to be issued under the scheme were set out in the prospectus, PDS or information memorandum lodged with ASX under rule 1.1 condition 3; or (b) the holders of the entity’s ordinary securities have approved the issue of equity securities under the scheme as an exception to this rule. The notice of meeting must have included: • a summary of the terms of the scheme. • the number of securities issued under the scheme since the entity was listed or the date of the last approval under this rule; • the maximum number of +equity securities proposed to be issued under the scheme following the approval; and • a voting exclusion statement. Exception 13 is only available if and to the extent that the number of +equity securities issued under the scheme does not exceed the maximum number set out in the entity’s prospectus, PDS or information memorandum (in the case of (a) above) or in the notice of meeting (in the case of (b) above). Exception 13 ceases to be available if there is a material change to the terms of the scheme from those set out in the entity’s prospectus, PDS or information memorandum (in the case of (a) above) or in the notice of meeting (in the case of (b) above). + See chapter 19 for defined terms 31 January 2020 Page 6
Notice to ASX Rio Tinto reveals maiden Resource at Winu and new discovery 28 July 2020 Rio Tinto has disclosed the maiden Inferred Mineral Resource at the 100% owned Winu copper-gold project and revealed the discovery of a new zone of gold dominant mineralisation approximately 2 km east of the Winu deposit in the Paterson Province of Western Australia. The Inferred Mineral Resource, reported at a 0.2% copper equivalent cutoff, is 503Mt at 0.45% copper equivalent (CuEq). This includes a higher grade component of 188Mt at 0.68% CuEq at a cutoff grade of 0.45% CuEq. Study work to date suggests the copper mineralisation supports the development of a relatively shallow open-pit mine, combined with industry-standard processing technology that is used at other Rio Tinto sites. Drilling continues to refine the overall geometry of the system and controls. The deposit remains open at depth as well as to the north and southeast (Figures 1 to 4). The Winu project team continues to work with local Nyangumarta and Martu Traditional Owners and regulators to progress the agreements and approvals required for any future development. We are targeting first production from Winu in 2023, subject to securing all necessary approvals. The discovery of a new zone of gold dominant mineralisation approximately 2 km east of the Winu deposit, at a prospect called Ngapakarra, as well as a number of other encouraging drilling results in close proximity to the maiden Winu Resource, provides further encouragement about the potential for the development of multiple ore bodies within one system. Rio Tinto group executive of Growth & Innovation and Health, Safety & Environment (HSE) Stephen McIntosh, said “We’re taking a more agile and innovative approach at Winu, and are working on the studies for a small- scale, start-up operation focused on Winu’s higher-grade core as we take another step towards commercialising this deposit. We are also assessing options for future expansion in the Paterson region given the extent of mineralisation identified to date and our large land package.” “The additional exploration results reported today support our view that there is potential to develop the Paterson region into a large-scale operation over time through both our 100% owned tenements and joint ventures1. We’ve so far carried out exploration activity in just 2% of our tenements in the region and we’re building on this discovery at Winu with further encouraging results.” Rio Tinto chief executive of Copper & Diamonds, Arnaud Soirat, said “We are very pleased with the progress at Winu as it adds a further option to our strong copper portfolio in a country that is home to many of Rio Tinto’s world class operations.” Winu Maiden Mineral Resource: A full tabulation of the Inferred Mineral Resource based on a notional pit shell is provided in Table A, including a summary of the resource at an elevated copper equivalent cutoff, constrained within the same pit shell. Results reported herein have been prepared in accordance with the reporting requirements set out in the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (the JORC Code). Details of data collection and resource estimation techniques are provided in Appendix A to this release in accordance with the Table 1 checklist in the JORC Code. 1 Rio Tinto has three Joint Ventures in the Paterson region including the Citadel Joint Venture with Antipa Minerals, the Waukarlycarly Joint Venture with Alloy Resources, and the West Paterson Joint Venture with Carawine Resources. Page 1 of 25
Table A: Inferred Mineral Resource tabulation for the Winu Project. CuEq% Cutoff Mt CuEq (%) Cu (%) Au (g/t) Ag (g/t) Supergene >=0.2 57 0.56 0.48 0.43 2.68 Hypogene >=0.2 446 0.43 0.34 0.25 2.09 Total >=0.2 503 0.45 0.35 0.27 2.15 Supergene >=0.45 29 0.80 0.66 0.55 3.61 Hypogene >=0.45 159 0.66 0.53 0.33 3.14 Total >=0.45 188 0.68 0.55 0.36 3.21 Footnote: Inferred Mineral Resource is constrained within a notional pit shell and tabulated above at different copper equivalent cutoffs. Copper equivalent is determined using Rio Tinto forward-looking pricing and preliminary metallurgical recovery assumptions. Figure 1 shows the location of the Winu project. Figure 2 shows a plan with the location of all Winu drill holes used in the resource evaluation. Figure 3 and Figure 4 provide representative cross sections through the Winu orebody. The deposit has been interpreted as a structurally controlled vein hosted Cu-Au deposit focused on the core of an anticline in Neoproterozoic metasediments. There are multiple vein generations and orientations but the veins are interpreted as being predominantly axial planar. Drilling has been carried out using a combination of diamond and reverse circulation (RC) drilling methods, with sampling predominantly on a 1m sample interval but honouring geological boundaries in the diamond drilled core. Assays have been carried out on half core and split RC samples using a combination of sequential leach assays, full acid digest with AES/MS finish and fire assay for gold. Estimation has been carried out by ordinary kriging for economic elements and simple kriging for density. Classification has been carried out after consideration of understanding of geological genesis model, assay and drilling quality and confidence in estimation parameters. In addition, estimation confidence has been evaluated using a ‘two-indicator method’ which indicates that an Inferred Mineral Resource classification is applicable to the entire Resource. Drill spacing varies between 75m x 75m in shallower portions of the resource model to 150m x 150m in deeper portions of the orebody. Reasonable prospects for eventual economic extraction have been assessed through preliminary mining and processing studies that indicate conventional open pit mining and processing routes would be appropriate in the exploitation of the Winu deposit. Reported Inferred Mineral Resources have been constrained within a notional pit shell using Rio Tinto forward looking price assumptions, potential processing routes and recoveries. Additional mineralised material outside of this pit shell is not reported as Inferred Mineral Resources in this release, however studies are ongoing to determine under what conditions these may be considered economic. The lowest cutoff grade reported (0.2% copper equivalent) is the marginal cutoff grade for the notional pit and the higher grade cutoff (0.45% copper equivalent) represents a full economic cutoff. Copper equivalents have been calculated using the formula CuEq = ((Cu%*Cu price 1% per tonne*Cu_recovery)+(Au ppm*Au price per g/t*Au_recovery)+ (Ag ppm*Ag price per g/t*Ag_recovery)) / (Cu price 1 % per tonne). Details of recoveries are shown on an average basis for varying cutoffs in Appendix A (JORC Table 1). For the purposes of this resource, reasonable prospects of eventual economic extraction have been demonstrated to a depth of 325 m based on a resource model that utilises assay results captured from a Page 2 of 25
combination of 286 reverse circulation (RC) and 104 diamond drill (DD) holes through to the end of 2019 comprising a total of 124,872 m of drilling. Winu Regional Exploration Results: Rio Tinto has discovered multiple new zones of gold dominant mineralisation in proximity to the Winu Mineral Resource. The Ngapakarra prospect (pronounced “naba-garra”), is approximately 2 km east of the Winu deposit. The prospect is located within similar metasedimentary rocks to the nearby Winu deposit. Results have identified high-grade vein-hosted fine-grained gold and associated mineralisation within stacked, sub-vertical vein sets that extend from a shallow depth beneath the cover sequence. The mineralisation remains open in all directions and at depth. A selection of the best gold intercepts to date include: . MONT0003: 23 m @ 4.53 g/t Au, from 120 m, including 0.75 m @ 97.1 g/t Au from 129 m . MONT0003: 2.88 m @ 33.3 g/t Au, from 163 m . MONT0003: 25 m @ 4.87 g/t Au, from 349 m, including 1 m @ 83.5 g/t Au from 352 m. Drilling on this prospect is at an early stage and additional exploration will be conducted at Ngapakarra throughout 2020 to further understand the mineralisation. In addition to Ngapakarra, three widely-spaced RC holes have been drilled immediately to the east of the Winu Mineral Resource envelope. One of these has intersected significant thicknesses of vein and breccia hosted high-grade gold mineralisation. Drillhole WINU0609 intersected 58 m @ 4.73 g/t Au from 231 m, including 10 m @ 11.5 g/t Au (from 243 m) and 6 m @ 21.3 g/t Au (from 263 m). All exploration activity has continued in parallel with sterilisation drilling to assist with the selection and design of appropriate areas for mining and infrastructure facilities. A total of 38 RC drillholes have been completed for sterilisation purposes. Data is provided for four diamond drill holes and eighty reverse circulation (RC) drill holes. Significant intercepts from the reported drilling are set out in Table B. Drillhole details are included in Annexure 1 to Appendix B to this release in accordance with the Table 1 checklist in the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (the JORC Code). The early stage exploration detailed in this report does not allow sufficient understanding to assess the potential size or quality of the mineralisation nor to enable estimation of a Mineral Resource. Figure 1 shows the location of the Winu project and Ngapakarra prospect. Figure 5 is a plan of all drill holes included in the Exploration Results reported in this release and Figure 6 provides a representative cross section through Ngapakarra. Page 3 of 25
Table B: Significant mineralised drill hole intercepts with >0.5 g/t Au. Minimum interval length is 10 m and maximum dilution allowed is 10 m. Down hole (m) Down hole Gold Copper Silver Drill hole From To length (m) (Au g/t) (Cu %) (Ag g/t) MONT0001 294 312 18 0.52 0.14 0.36 MONT0001 360.3 379 18.7 1.47 0.12 0.46 MONT0003 65 104 39 0.87 0.09 0.53 MONT0003 120 143 23 4.53 0.10 0.52 MONT0003 185 202 17 0.78 0.10 0.25 MONT0003 274 333 59 0.99 0.21 0.67 MONT0003 349 374 25 4.87 0.43 1.46 MONT0004 266 310 44 0.58 0.16 0.46 MONT0004 355 374 19 1.62 0.44 1.72 WIDI0001 115 143 28 0.92 0.04 0.14 WIDI0001 168 178 10 0.76 0.03 0.10 WINU0498 112 137 25 5.81 0.31 1.45 WINU0498 176 229 53 1.39 0.21 0.78 WINU0504 185 202 17 0.98 0.09 0.36 WINU0504 227 251 24 0.66 0.04 0.14 WINU0540 145 160 15 0.61 0.12 0.49 WINU0541 193 204 11 0.84 0.19 0.75 WINU0541 227 238 11 0.57 0.17 0.49 WINU0543 185 207 22 0.93 0.10 0.48 WINU0609 58 72 14 0.79 0.08 0.32 WINU0609 231 289 58 4.73 0.35 1.31 Footnote: All drillholes listed in Annexure 1 that don’t occur in the above table did not contain mineralised intercepts meeting the >0.5 g/t Au, 10 m minimum interval length, and 10 m maximum dilution criteria. Many of these unmineralised drillholes were drilled for sterilisation purposes. Competent Persons Statement The information in this report that relates to Mineral Resources and Exploration Results is based on information compiled under the supervision of Dr Julian Verbeek who is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity to which he is undertaking to qualify as a competent person as defined in the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Dr Julian Verbeek is a full-time employee of Rio Tinto and consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Page 4 of 25
Figure 1: Location map of the Winu project and Ngapakarra Page 5 of 25
Figure 2: Drill hole collar location plan for all Winu holes used in the resource evaluation. Cross section line location is indicated. Selected drillholes are labelled as a reference to allow for comparison with the previous release. Page 6 of 25
Figure 3: Cross section through the Winu orebody showing the geological model and copper assay intercepts. Figure 4: Representative cross-section through the Winu mineralisation model. Footnote: Not all of the mineralisation shown is considered to have the potential for economic extraction; only that subset that is considered potentially economic is tabulated as Inferred Mineral Resource. Page 7 of 25
Figure 5: Drill hole collar location plan for all drillholes reported for regional Exploration Results reported in this release. Cross section line location is indicated. All drill hole numbers not prefixed are WINU* series. Page 8 of 25
Figure 6: Cross section through Ngapakarra showing the geological model and gold-copper-silver assay intercepts. Page 9 of 25
Appendix A: Winu Maiden Resource Project: JORC Table 1 The following table provides a summary of important assessment and reporting criteria used at the Winu Project for the reporting of Mineral Resources in accordance with the Table 1 checklist in The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition). Criteria in each section apply to all preceding and succeeding sections. SECTION 1 SAMPLING TECHNIQUES AND DATA Criteria Commentary Sampling Samples are obtained using both reverse circulation (RC) and diamond drilling. Reverse techniques circulation drilling samples were collected from a cone split on the cyclone on a 1m interval. The sample consisted of 10% of the drilled metre and its weight varied from 2 to 5 kg. Heavy samples were split manually using a single tier riffle splitter to produce a manageable sample weight. PQ was drilled on a 1.5m run and HQ diamond core was drilled on a 3m run. The core was cut using an automated core-cutter and a half core sample was collected on 1m intervals. Drilling has been carried out under Rio Tinto supervision by experienced drilling contractors. Drilling The drilling consisted of reverse circulation with face sampling bit and triple tubed diamond techniques drilling from surface. The drill holes were generally cased to 30 m progressing from PQ to HQ at 160 m on average; however, exact depths vary from hole to hole. Most drilling is oriented approximately east to west with DD at approximately -60o ; some west to east scissor holes and north-south oriented DD holes have also been drilled. RC holes are east to west at -85o. The core was oriented using an ACT III RD tool. At the end of each run, the low side of the core was marked by the drillers and this was used at the site for marking the whole drill core with a reference line. Drill sample Core recovery was measured and recorded continuously from the start of core drilling to the recovery end of the hole for each drill hole. The end of each run of 1.5m or 3m length was marked by a core block which provided the depth, the core drilled and the core recovered. Generally the core recovery was >99%. RC samples were weighed upon arrival at the laboratory. Sample weights were reviewed to identify any potential loss. Loss of RC sample below the water table has been identified and as a result, sample intervals captured below the water table have been excluded from the database used to estimate the resource. Logging Detailed descriptions of core were logged qualitatively for lithological composition and texture, structures, veining, alteration and copper speciation. Visual percentage estimates were made for some minerals, including sulphides. Structural and geotechnical measurements were recorded. All the DD drilled holes were logged before sampling. All recovered core is logged in detail. The core was photographed both dry and wet inside the core trays. The logging of the RC chips was done after sieving and washing of the material collected from the cyclone. All logging information is uploaded into an acQuire database. Sub-sampling PQ (85mm) and HQ (63.5mm) diamond core was sawn into two, and half was collected in a techniques and bag and submitted for analysis, the other half was kept in the tray and stored. The core was sample sampled at 1m intervals with breaks for major geological changes. Intervals generally range preparation from 0.5 m to 1 m. The diamond half core and RC samples were sent to an ALS Limited laboratory, where they were dried and crushed to 70% passing 2 mm and then split using a rotary splitter to produce Page 10 of 25
Criteria Commentary a 750 g sub-sample. The crushed sub-sample was pulverised with 85% passing 75 μm using a LM2 mill and a 100 g pulp was then subsampled for ICP and 30 to 50 g for fire assay. A portion of the 2 mm sized material was used for VNIR/SWIR spectral readings, which were sent to AusSpec International for interpretation. Sample sizes are considered appropriate for the style of mineralisation. Quality of assay All samples were submitted to an ALS Limited laboratory in Perth. data and 51 elements were analysed using 4-acid digestion followed by ICP-OES/MS measurements, laboratory tests including qualitative Au, Pt and Pd. 30 to 50 g of sample were used for Au analysis by fire assay with AAS finish. Portable XRF analysis on pulp for Cr, Nb, S, Si, Ta, Ti, Y and Zr was done using a Delta and Vanta Olympus instrument. Quality control samples consisted of field duplicates (1:20), crush duplicates (1:20), pulp duplicates (1:20), blanks (1:20) and certified reference materials (3:100). All the results are checked in the acQuire database before being used, and the analysed batches are continuously reviewed to ensure they are performing within acceptable accuracy and precision limits for the style of mineralisation. Any failures during this quality control process requires the batch to be re-analysed prior to acceptance into the database. Verification of All the sample intervals were visually verified using high quality core photography through sampling and Imago, and some selected samples were taken inside the mineralised interval for optical and assaying petrographic microscopy by qualified petrographers. No adjustment was made to the assay data that are electronically uploaded from the laboratory to the database. The drill core logging data is managed by a computerised system and strict validation steps were followed. The data are stored in a secured database with restricted access. Within the Winu drilling area, a total of 23 sets of twin holes have been drilled and assayed consisting of 6 sets of DD/DD, 14 sets DD/RC and 3 sets RC/RC. A study of any bias between the different drilling methods is currently underway. A systematic analysis of duplicate samples was carried out at each stage of sampling including field, crush and pulp duplicates. The results from the duplicates were within acceptable range for this type of mineralisation and the classification of the resource. The results from blanks did not indicate contamination during the laboratory procedure. Documentation of primary data, data entry procedures, data verification and data storage protocols have all been validated by a third-party audit. Location of data Drill hole collar locations were surveyed after drilling utilising a handheld Garmin GPS with an points accuracy of 5 m, and on a campaign basis by an independent survey contractor using a Leica Viva GS15 GNSS base and rover system operating in RTK mode to a stated accuracy of +/- 20 mm. The topography is relatively flat with average elevation of 240 m. The data for the collars are provided in the Geocentric Datum of Australia (GDA94 zone 51). Downhole surveys were completed every 10, 25 or 50 m using a Reflex EZ Gyro or Reflex SPRINT-IQ. Some RC drill holes could not be completely surveyed due to downhole blockages. Data spacing At Winu, the diamond drill hole spacing is 130 to 150 m across strike by 150 m or 300 m and distribution along strike (between lines). The reverse circulation drill hole spacing is on a 75 m by 75 m grid with over 95% of the drilling completed and included in the resource estimation. A reverse circulation grade variability cross at 25 m spacing was completed at Winu as a part of the drilling included in this report. At Winu, the current drilling provides sufficient information to support an Inferred Mineral Resource for a significant portion of the mineralised body. At Winu, the mineralisation is still open to the north, southeast and at depth and further Page 11 of 25
Criteria Commentary drilling is planned to explore these zones in 2020. Downhole compositing of drillhole samples intervals for grade estimation purposes is discussed in section 3. Orientation of At Winu, the majority of the drilling is orientated to the west, perpendicular to the main data in relation structural NNW trend; however there are multiple mineralisation events and data collection to geological and interpretation to understand the geological structures and controls on mineralisation is structure ongoing. Sample security Samples in calico bags are stored on site in enclosed stillages and transported via road on trucks from the site to an ALS Limited laboratory in Perth via Port Hedland. Sample numbers were generated directly from the database. Each sample was given a barcode at the laboratory and the laboratory reconciled the received sample list with physical samples. Barcode readers were used at the different stages of the analytical process. The laboratory uses a LIMS system that further ensures the integrity of the results. All sample pulps are stored in a secure warehouse facility. Audits or The database containing the Winu data has been independently checked by a third party in reviews August 2019 and shown to be accurate. SECTION 2 REPORTING OF EXPLORATION RESULTS Criteria Commentary Mineral All Rio Tinto Exploration tenements are kept with respect to the legislation in terms of tenement and obligations including minimum expenditure. This project is located within Exploration Licence land tenure E45/4833, which is 100% owned by Rio Tinto and expires on the 12th of October 2022. status Exploration done No exploration has been carried out in the Winu area prior to Rio Tinto work in 2016. by other parties Geology The prospect is located on the Anketell Shelf of the Yeneena Basin, a Neoproterozoic sequence of metasedimentary rocks and granitoids that is entirely covered by Phanerozoic sediments (mostly Permian) that range from 50-100 m thick in the Winu area. The main lithologies intercepted by the current drilling at Winu include metasedimentary rocks (quartzites, metasandstones, metasiltstones and metapelites), unmetamorphosed sedimentary cover rocks (conglomerates, gritstones, arkoses and mudstones) and dolerite. Host rocks to copper-gold mineralisation are fine to medium-grained subarkosic metasandstones and biotite-rich metasiltstones. The mineralisation is predominantly vein and breccia controlled chalcopyrite and chalcocite with associated pyrite, pyrrhotite, molybdenite, bornite, scheelite, bismuthinite and wolframite. Several generations of veins and breccias are identified and characterised by different mineralogical assemblages and textures. The main mineralisation event is associated with quartz-K-feldspar-sulphide and sulphide-carbonate veins with dominantly K- feldspar, muscovite, biotite and/or chlorite wallrock alteration. Primary sulphide mineralisation is overlain by a supergene blanket containing secondary copper minerals as well as native copper in places. Page 12 of 25
Criteria Commentary Drill hole Summary of drilling used for the Winu mineral resource estimate: information Drill type Number of holes Total metres RC 286 68,088 DD 104 56,784 Total 390 124,872 Data Previous public reports on Winu exploration results (“Rio Tinto Exploration Update – copper- aggregation gold mineralisation discovered in the Paterson Province in the far east Pilbara region of methods Western Australia” released to ASX on 27 February 2019; “Rio Tinto Exploration Update – Winu Project”, released to ASX on 6 June 2019; “Rio Tinto Exploration Update – Winu Project”, released to the ASX on 1 August 2019) have reported intersections in an aggregated form. No further detailed drill results are reported in this release. All assay data used in the Winu mineral resource estimate have been composited to 2m by geology domain for resource modelling and estimation. Relationship Previous public releases for Winu have reported intersections as apparent widths. No further between drilling results for Winu are included in this release. mineralisation widths and intercept lengths Diagrams Plans are included in the release as below: Location map (Figure 1), Winu drill hole collar plan (Figure 2), Winu cross section (Figure 3), Winu cross section with the resource model (Figure 4). Not all holes shown on Figure 2 are labelled. Those that are allow comparison with the 1 August 2019 release of exploration results. Balanced This is the fourth public release for the Winu deposit. Drilling is ongoing and further updates reporting will be released at an appropriate time. No additional drillhole information for Winu is included in this release. Other Specific gravity measurements were taken on 20 cm lengths of solid core every 20 m, substantive representing different lithologies and mineralised intervals. The measurement used the exploration data hydrostatic/gravimetric method (Archimedes Principle of buoyancy). Hyperspectral and high-resolution core imagery is being collected using a CoreScan Hyperspectral Core Imager. Whole core is imaged at Winu prior to sample cutting, where possible. Historical Winu core from 2018 and 2019 is imaged as half core. Magnetic susceptibility was measured for each sample using KT-10 (kappameter) instrument. Geophysical surveys were carried out over the deposit area including airborne electromagnetics, ground gravity, induced polarisation/resistivity, passive seismic, and downhole density, gamma, conductivity, resistivity, induced polarisation, magnetic susceptibility, and optical and acoustic televiewer. At Winu, geometallurgical characterisation has been conducted on numerous holes since the project commenced and has informed an early understanding of the potential metal recovery. This work is continuing throughout 2020. LiDAR imagery was acquired to help in better planning and reporting of the exploration programme. Further work Rio Tinto will continue to evaluate and interpret the results from the 2020 work programme at Winu. The results presented here indicate the mineralisation is not closed off by the drilling Page 13 of 25
Criteria Commentary performed to date. Drilling at Winu is ongoing to define the extents of the mineralisation and to provide increased confidence in a potential initial mining area. Metallurgical test work is ongoing. Geotechnical drilling and logging is ongoing. Installing water bores and water monitoring points is ongoing. In addition to the ongoing work at Winu, Rio Tinto is conducting exploration within the broader Paterson Province on its wholly owned licences and joint venture licences during 2020. SECTION 3 ESTIMATION AND REPORTING OF MINERAL RESOURCES Criteria Commentary Database All drilling data is stored in the Rio Tinto Exploration acQuire™ drillhole database. The system is integrity backed up daily to a server based in Perth. All data is transferred electronically and is checked prior to upload to the database. In-built validation tools are used in the acQuire™ database and data loggers are used to minimise keystroke errors, flag potential errors and validate against internal library codes. Data that is found to be in error is investigated and corrected where possible. If the data cannot be corrected it is removed from the data set used for resource modelling and estimation. Routine checks of raw assay data against the database have been implemented. Drillhole collars are visually validated and compared to planned locations. Downhole trends and sectional trends are validated and outliers checked. Statistical analysis of assay results by geology domains are checked for trends and outliers. Ongoing comparison with earlier work is undertaken. The drillhole database used for the resource estimation has been validated. Methods included checking of QAQC data, extreme values, zero values, negative values, possible miscoded data based on location within a geology domain and assay value, sample overlaps, and inconsistencies in length of drillhole surveyed, length of drillhole logged and sampled and sample size at laboratory. RC sample intervals below the water table have been removed from the resource estimation. Site Visits The Competent Person visited the Winu site in Q3 2018 and observed diamond drilling underway and examined diamond drilled cores. He has remained closely linked with the site team and has used remote logging facilities (core photographs and virtual logging) to remain familiar with mineralisation styles. Geological The geology of the deposit has been interpreted entirely on the basis of drill cores, RC chips and interpretation analyses. The orebody is not yet exposed. Nevertheless, the sequences of cover, supergene zones and hypogene zones are well defined albeit at the scale of the drill grid. Details of geology are discussed in Section 2. It is likely that the supergene zones will be more variable at short range. Within the hypogene zone, no geological controls have been used in the estimation; differentiation of estimated grades within the hypogene, with the exception of a mafic dyke, are controlled only by geostatistics. The model uses a broad grade shell to limit extrapolation into areas of low data density. The geological genesis model for Winu is that the primary mineralisation is contained in veins of various orientations, focused along the axial plane of an antiform which dips steeply towards the ENE. Some stratigraphy-parallel veins that crosscut the axial planar fabric have been identified and these appear to be more common on the limbs of the antiform. Primary mineralisation is remobilised into supergene zones that are discordant to the axial planar fabric. Grade continuity within the broader mineralised zone is good, but on a small scale the veins are Page 14 of 25
Criteria Commentary considered to be discontinuous resulting in high short range variability. Dimensions The Winu deposit strikes approximately NNW/SSE with a strike extent of 2,700m and width of approximately 400m in the main hypogene mineralisation, and up to 700m in the supergene mineralisation. Mineralisation starts approximately 80m below surface. Estimation and Estimation technique for Cu, Au, Ag, and Bi is ordinary kriging. Density is estimated by simple modelling kriging. A resource grade shell defining the limits of typical mineralization (~0.2% Cu) is designed techniques to limit extrapolation into low mineralisation areas and areas with low sample density. Thorough exploratory data analysis was conducted to generate domains, evaluate domain boundary conditions, establish variogram models, and define interpolation parameters and maximum distance of extrapolation. A nested search routine of 4 passes is constructed for each domain and all variables. The searches are based on ranges at increasing proportions of the sill with the final pass (4) at the full range of the variogram. High grade “outliers” are identified based on grade within relevant domains. These outliers are not cut but are restricted to use within a specified ellipse. These outliers are established through cumulative frequency plots and occur at >98% of the cumulative distribution respective to estimation domains, representing less than 1% of the data overall. Drill spacing above approximately 250 m below surface is a mixture of diamond drilling and RC drilling resulting in a nominal 75 x 75 m drilling grid. Below this depth the drilling method is diamond drilling only and the drilling grid is approximately 150 x 150 m. Maximum nominal drill spacing (use of 3 drillholes) for Cu and Au estimation is 160 m from sample support within the Inferred Resource. Block models are constructed using sub-cells to respect the detailed geological modelling. 45 m (x) by 45 m (y) by 5 m (z) parent cell assignment is used for grade estimation; all sub-blocks of the same domain within a parent block have the same grade estimate and are estimated at the parent cell’s block centroid. Estimation is completed with Vulcan software. Fundamental validation is through testing against composite statistics and a nearest neighbour estimate by grade profile (swath) plot. Additionally, models are compared to previous iterations, and section analysis is completed of estimates vs composite assays. A number of preliminary estimates have been prepared as data has progressively become available and these have been subject to internal peer reviews and high level external consultant reviews. An independent resource estimate has also been prepared as a check. All these estimates are very similar in terms of global grades but tonnages have progressively increased with the addition of new drilling. The resource is presented on the basis of in situ metal grades at a copper equivalent (CuEq) cutoff. The CuEq is calculated using recoveries based on preliminary metallurgical processing studies. Only Cu, Au and Ag are considered in the metal equivalent calculation. Commodity prices used in the metal equivalent calculation are considered commercially sensitive. Forward looking prices have been used in accordance with forecasts prepared by Rio Tinto’s marketing and economics department Only bismuth has been estimated as a deleterious element but this is not presented as part of the Inferred Mineral Resource. Acid generating potential has been evaluated by testwork in preliminary studies but this has not been estimated in the resource model. The variables have been estimated independently. Correlation between Cu and Au is low. Correlation between Cu and Ag and Au and Bi are higher, but they have still been estimated independently. Geological domains have been used to control estimation within the supergene zones. Within the hypogene zone the only distinction that has been made is between Proterozoic metasediments and mafic dykes. Moisture All tonnages and grades are presented on a dry basis. Cutoff The cutoff parameters used as the basis of this resource are on a copper equivalent basis. Parameters Average grades for the individual metals included in the metal equivalent calculation are shown in the Mineral Resource tabulations. Page 15 of 25
Criteria Commentary Metal prices used are provided by Rio Tinto Economics and are generated based on industry capacity analysis, global commodity consumption and economic growth trends. A single long term price point is used in the definition of ore and waste and in the financial evaluations underpinning the resources statement. The detail of this process and of the price points selected are commercially sensitive and are not disclosed. Average recoveries across major domains are as follows (rounded). They are derived from metallurgical testwork and detailed mineralogy carried out on dedicated metallurgical drillholes. Average CuEq% Recovery Cutoff (%) Cu Au Ag Supergene >=0.2 74 63 57 Hypogene >=0.2 95 63 51 CuEq% Recovery Cutoff (%) Cu Au Ag Supergene >=0.45 82 62 61 Hypogene >=0.45 95 63 50 It is the company’s opinion that all the elements included in the metal equivalent calculation have a reasonable potential to be recovered and sold. CuEq = ((Cu%*Cu price 1% per tonne*Cu_recovery)+(Au ppm*Au price per g/t*Au_recovery)+ (Ag ppm*Ag price per g/t*Ag_recovery)) / (Cu price 1 % per tonne) Mining factors or Surface mining is the most likely method to be used in the extraction of this orebody. Mining assumptions assumptions were based on bench marking from other Rio Tinto surface mining operations. Reasonable prospects of eventual economic extraction have been determined through assessment of the model at scoping study level using pit optimisation, strategic scheduling through to an initial financial model. Metallurgical The basis for predictions of metallurgical performance is comminution and flotation test work factors or conducted on samples composited from individual geometallurgical zones within several individual assumptions drill holes. Preliminary studies indicate that the mineralisation is amenable to processing through conventional crushing, grinding, and flotation circuits, with gold recovery improved by inclusion of a gravity circuit. More detailed metallurgical test work is planned. Environmental Waste disposal will be via surface landforms that will be rehabilitated at the end of mine life. factors or Process tailings will be stored in surface tailings dams. This has been factored into the closure cost assumptions estimates. Bulk Density Bulk density has been determined using Archimedes Principle within polythene bags to provide both wet and dry densities. Bulk density has been interpolated using simple kriging within geological domains. Classification This entire resource is classified as Inferred Mineral Resource. Classification has taken into account confidence in drillhole sampling, QA/QC including standards, blanks and repeat samples, confidence in the understanding of the controls on mineralisation and interpretation of the geological model and estimation parameters. Only mineralisation that is considered to have Reasonable Prospects of Eventual Economic Extraction (RPEEE) has been reported as Inferred Mineral Resource in this release. Page 16 of 25
Criteria Commentary The geological and resource models include significant additional mineralisation that does not currently meet the requirements of RPEEE or has very low drilling density. Studies and infill drilling are ongoing to determine whether there are scenarios under which the additional mineralisation could be economically extracted. This classification is in accordance with the view of the Competent Person. Audits and There are no formal external audits for this resource but reference is made to consistent Reviews preliminary estimates and an independent estimate above. Discussion of The level of accuracy of the resource estimation has been estimated using the ‘two indicator’ relative method of Dr Harry Parker which suggests that the error in the estimate (on the basis of contained accuracy/ metal) exceeds 15% at 90% confidence for a mining block equivalent to one year’s production. confidence This is consistent with an Inferred Mineral Resource classification. Maiden Inferred Mineral CuEq% Resources Cutoff Mt CuEq (%) Cu (%) Au (g/t) Ag (g/t) Supergene >=0.2 57 0.56 0.48 0.43 2.68 Hypogene >=0.2 446 0.43 0.34 0.25 2.09 Total >=0.2 503 0.45 0.35 0.27 2.15 Supergene >=0.45 29 0.80 0.66 0.55 3.61 Hypogene >=0.45 159 0.66 0.53 0.33 3.14 Total >=0.45 188 0.68 0.55 0.36 3.21 Footnote: Inferred Mineral Resource is constrained within a notional pit shell and tabulated above different copper equivalent cutoffs. Copper equivalent is determined using Rio Tinto forward-looking pricing and preliminary metallurgical recovery assumptions. Page 17 of 25
Appendix B: Winu Regional Drilling - JORC Table 1 The following table provides a summary of important assessment and reporting criteria used for the Winu Regional Drilling for the reporting of Exploration Results in accordance with the Table 1 checklist in The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition). Criteria in each section apply to all preceding and succeeding sections. SECTION 1 SAMPLING TECHNIQUES AND DATA Criteria Commentary Sampling Samples are obtained using both reverse circulation (RC) and diamond drilling (DD). techniques Exploration RC drilling samples were collected from a cone split on the cyclone on a 1m interval. The sample consisted of 12% of the drilled metre and its weight varied from 2 to 5 kg. Heavy samples were split manually using a single tier riffle splitter to produce a manageable sample weight. Sterilisation RC drilling samples were collected from a cone split on the cyclone on a 2m interval. The sample consisted of 8% of the drilled 2m interval and its weight varied from 3 to 6 kg. Heavy samples were split manually using a single tier riffle splitter to produce a manageable sample weight. PQ was drilled on a 1.5m run and HQ diamond core was drilled on a 3m run. The core was cut using an automated core-cutter and a half core sample was collected on 1m intervals. Drilling has been carried out under Rio Tinto supervision by experienced drilling contractors. Drilling The drilling consisted of reverse circulation with face sampling bit and triple tubed diamond techniques drilling from surface. The diamond drill holes were generally cased to 30m progressing from PQ to HQ at 160m on average; however, exact depths vary from hole to hole. Most drilling at the Ngapakarra prospect is oriented approximately to the northeast with DD at approximately -60° and some RC at approximately -70°, with all other exploration RC holes at - 85°. RC holes drilled for sterilisation purposes are east to west at -85°. The core was oriented using an ACT III RD tool. At the end of each run, the low side of the core was marked by the drillers and this was used at the site for marking the whole drill core with a reference line. Drill sample Core recovery was measured and recorded continuously from the start of core drilling to the end recovery of the hole for each drill hole. The end of each run of 1.5m or 3m length was marked by a core block which provided the depth, the core drilled and the core recovered. Generally the core recovery was >99%. RC samples were weighed upon arrival at the laboratory. Sample weights were reviewed to identify any potential loss. Logging Detailed descriptions of core were logged qualitatively for lithological composition and texture, structures, veining, alteration and copper speciation. Visual percentage estimates were made for some minerals, including sulphides. Structural and geotechnical measurements were recorded. All the DD drilled holes were logged before sampling. All recovered core is logged in detail. The core was photographed both dry and wet inside the core trays. The logging of the RC chips was done after sieving and washing of the material collected from the cyclone. All logging information is uploaded into an acQuireTM database. Sub-sampling PQ (85mm) and HQ (63.5mm) diamond core was sawn into two, and half was collected in a bag techniques and and submitted for analysis, the other half was kept in the tray and stored. The core was sampled at 1m intervals with breaks for major geological changes. Intervals generally range from 0.5 m to 1 m. Page 18 of 25
Criteria Commentary sample The diamond half core and RC samples were sent to an ALS Limited laboratory, where they were preparation dried and crushed to 70% passing 2 mm and then split using a rotary splitter to produce a 750 g sub-sample. The crushed sub-sample was pulverised with 85% passing 75 μm using a LM2 mill and a 100 g pulp was then subsampled for ICP and 30 to 50 g for fire assay. A portion of the 2 mm sized material was used for VNIR/SWIR spectral readings, which were sent to AusSpec International for interpretation. Sample sizes are considered appropriate for the style of mineralisation. Quality of assay All samples were submitted to an ALS Limited laboratory in Perth. data and 51 elements were analysed using 4-acid digestion followed by ICP-OES/MS measurements, laboratory tests including qualitative Au, Pt and Pd. 30 to 50 g of sample were used for Au analysis by fire assay with AAS finish. Portable XRF analysis on pulp for Cr, Nb, S, Si, Ta, Ti, Y and Zr was done using a Delta and Vanta Olympus instrument. Quality control samples consisted of field duplicates (1:20), crush duplicates (1:20), pulp duplicates (1:20), blanks (1:20) and certified reference materials (3:100). All the results are checked in the acQuire database before being used, and the analysed batches are continuously reviewed to ensure they are performing within acceptable accuracy and precision limits for the style of mineralisation. Any failures during this quality control process requires the batch to be re- analysed prior to acceptance into the database. Verification of All the sample intervals were visually verified using high quality core photography through Imago, sampling and and some selected samples were taken inside the mineralised interval for optical and petrographic assaying microscopy by qualified petrographers. No adjustment was made to the assay data that are electronically uploaded from the laboratory to the database. The drill core logging data is managed by a computerised system and strict validation steps were followed. The data are stored in a secured database with restricted access. A systematic analysis of duplicate samples was carried out at each stage of sampling including field, crush and pulp duplicates. The results from the duplicates were within acceptable range for this type of mineralisation. The results from blanks did not indicate contamination during the laboratory procedure. Location of data Drill hole collar locations were surveyed after drilling utilising a handheld Garmin GPS with an points accuracy of 5 m, or on a campaign basis by an independent survey contractor using a Leica Viva GS15 GNSS base and rover system operating in RTK mode to a stated accuracy of +/- 20 mm. The topography is relatively flat with average elevation of 240 m. The data for the collars are provided in the Geocentric Datum of Australia (GDA94 zone 51). Downhole surveys on all drillholes were completed every 10, 25 or 50 m using a Reflex EZ Gyro or Reflex SPRINT-IQ. Some RC drill holes could not be completely surveyed due to downhole blockages. Data spacing At Ngapakarra, the reverse circulation drill hole spacing is 200 m by 200 m with some closer and distribution spaced 100 m by 100 m drilling. Only four diamond drill holes have been completed and do not currently conform to a grid. The current drilling does not provide sufficient information for estimation of a Mineral Resource. The true extents of the intercepted mineralisation at Ngapakarra are unknown and drilling to define the extents will continue during 2020. Data aggregation of samples is discussed in Section 2. Orientation of Diamond drilling is mainly orientated perpendicular to the main structural trend of the data in relation mineralisation; however, there is insufficient data to confirm the geological model. Page 19 of 25
Criteria Commentary to geological structure Sample security Samples in calico bags are stored on site in enclosed stillages and transported via road on trucks from the site to an ALS Limited laboratory in Perth via Port Hedland. Sample numbers were generated directly from the database. Each sample was given a barcode at the laboratory and the laboratory reconciled the received sample list with physical samples. Barcode readers were used at the different stages of the analytical process. The laboratory uses a LIMS system that further ensures the integrity of the results. All sample pulps are stored in a secure warehouse facility. Audits or No external audits have been performed due to the early stage of this exploration. reviews SECTION 2 REPORTING OF EXPLORATION RESULTS Criteria Commentary Mineral All Rio Tinto Exploration tenements are kept with respect to the legislation in terms of obligations tenement and including minimum expenditure. This project is located within Exploration Licence E45/4833, land tenure which is 100% owned by Rio Tinto and expires on the 12th of October 2022. status Exploration done No exploration has been carried out in the Winu area prior to Rio Tinto work in 2016. by other parties Geology The prospect is located on the Anketell Shelf of the Yeneena Basin, a Neoproterozoic sequence of metasedimentary rocks and granitoids that is entirely covered by Phanerozoic sediments (mostly Permian) that range from 50-100 m thick in the Winu and Ngapakarra areas. Drilling completed west of Winu for sterilisation purposes has encountered increasing thicknesses of the Permian sedimentary rocks. The main lithologies intercepted by the current drilling at Winu and Ngapakarra include metasedimentary rocks (quartzites, metasandstones, metasiltstones and metapelites), unmetamorphosed sedimentary cover rocks (conglomerates, gritstones, arkoses and mudstones) and dolerite. Host rocks to copper-gold mineralisation are fine to medium-grained subarkosic metasandstones, biotite-rich metasiltstones, calcareous metasiltstones and quartzites. The mineralisation at Ngapakarra is predominantly vein controlled native gold and chalcopyrite with associated pyrite, pyrrhotite, and bismuthinite. The main mineralisation event is associated with brecciated or fractured quartz-biotite-carbonate-sulphide veins with dominantly biotite, chlorite and/or carbonate-epidote wallrock alteration. Primary sulphide mineralisation is overlain by a supergene blanket that rarely contains secondary copper minerals. Drill hole Drill type Number of holes Total metres information RC 80 20,629 DD 4 1,917 Total 84 22,546 Annexure 1 provides details of drill hole coordinates, orientations and length for all drill holes in this release. Page 20 of 25
Criteria Commentary Data The average grades tabulated in this report are all length-weighted averages above a 0.5 g/t Au aggregation cutoff. Minimum interval length is 10 m and maximum dilution allowed is 10 m. methods Relationship Insufficient data is available to confirm the geological model and as such all results are reported in between apparent width; the true width is still unknown. mineralisation widths and intercept lengths Diagrams Plans are included in the release as below: Location map (Figure 1), Drill hole collar plan (Figure 5), Ngapakarra cross section (Figure 6). Balanced This is the first public release for drillholes surrounding the Winu deposit and the first public release reporting for the Ngapakarra prospect. Drilling is ongoing and further updates will be released at an appropriate time. All relevant holes are reported. Some of these were drilled as sterilisation holes and were not anticipated to intersect mineralisation. Other Specific gravity measurements were taken on 20 cm lengths of solid core every 20 m, substantive representing different lithologies and mineralised intervals. The measurement used the exploration data hydrostatic/gravimetric method (Archimedes Principle of buoyancy). Hyperspectral and high-resolution core imagery is being collected using a CoreScan Hyperspectral Core Imager. Whole core is imaged prior to sample cutting, where possible. Magnetic susceptibility was measured for each sample using KT-10 (kappameter) instrument. Geophysical surveys were carried out over the area including airborne electromagnetics, ground gravity, induced polarisation/resistivity, passive seismic, and downhole density, gamma, conductivity, resistivity, induced polarisation, magnetic susceptibility, and optical and acoustic televiewer. LiDAR imagery was acquired to help in better planning and reporting of the exploration programme. Further work Rio Tinto will continue to evaluate and interpret the results from the 2020 work programme. The results presented here indicate the mineralisation is not closed off by the drilling performed to date. In addition to the ongoing work on the prospects surrounding the Winu deposit, Rio Tinto is conducting exploration within the broader Paterson Province on its wholly owned licences and joint venture licences during 2020. Page 21 of 25
Annexure 1: Drill hole coordinates, orientations and depths The data for the collars are provided in the Geocentric Datum of Australia (GDA94 zone 51) Easting Northing Elevation Down hole Dip Azimuth Hole Drill hole Hole type Hole status (mE) (mN) (m RL) depth (m) (deg) (deg) Purpose MONT0001 371545 7707202 251 489.8 -60 0 Diamond Complete Exploration MONT0002 371594 7706986 248 495.6 -60 40 Diamond Complete Exploration MONT0003 371677 7707147 250 414.8 -70 40 Diamond Complete Exploration MONT0004 371536 7707196 245 516.7 -60 40 Diamond Complete Exploration WIDI0001 371817 7707078 250 240 -90 0 RC Complete Exploration WIDI0008 371747 7707044 249 246 -90 0 RC Complete Exploration WINU0497 371542 7707042 248 180 -70 40 RC Complete Exploration WINU0498 371682 7707152 251 255 -70 40 RC Complete Exploration WINU0499 371619 7707107 250 57 -70 40 RC Abandoned Exploration WINU0500 371933 7707042 250 255 -70 40 RC Complete Exploration WINU0501 371839 7706965 250 255 -70 40 RC Complete Exploration WINU0502 372050 7706944 250 255 -70 40 RC Complete Exploration WINU0503 371937 7706846 248 247 -70 40 RC Complete Exploration WINU0504 371621 7707108 250 255 -70 40 RC Complete Exploration WINU0521 370703 7707033 248 252 -85 265 RC Complete Sterilisation WINU0522 372117 7707759 257 252 -85 265 RC Complete Sterilisation WINU0523 372099 7707925 256 252 -85 265 RC Complete Sterilisation WINU0524 371770 7708027 256 252 -85 265 RC Complete Sterilisation WINU0525 369918 7708766 251 180 -85 265 RC Complete Sterilisation WINU0526 370237 7708620 252 252 -85 265 RC Complete Sterilisation WINU0527 370545 7708524 253 252 -85 265 RC Complete Sterilisation WINU0528 370877 7708395 254 270 -85 265 RC Complete Sterilisation WINU0529 371189 7708274 254 252 -85 300 RC Complete Sterilisation WINU0530 371503 7708151 256 252 -85 265 RC Complete Sterilisation WINU0538 370662 7707178 250 250 -85 265 RC Complete Sterilisation WINU0539 371883 7706984 249 250 -85 265 RC Complete Exploration WINU0540 371408 7707245 251 250 -85 265 RC Complete Exploration WINU0541 371450 7707097 249 250 -85 265 RC Complete Exploration WINU0542 371747 7706821 248 250 -85 265 RC Complete Exploration WINU0543 372044 7706847 249 250 -85 265 RC Complete Exploration WINU0544 371911 7706685 249 250 -85 265 RC Complete Exploration WINU0545 372209 7706709 249 250 -85 265 RC Complete Exploration WINU0546 372372 7706574 249 250 -85 265 RC Complete Exploration WINU0547 372508 7706436 250 250 -85 265 RC Complete Exploration WINU0548 372233 7706411 251 226 -85 265 RC Complete Exploration WINU0549 372070 7706547 250 238 -85 265 RC Complete Exploration Page 22 of 25
Easting Northing Elevation Down hole Dip Azimuth Hole Drill hole Hole type Hole status (mE) (mN) (m RL) depth (m) (deg) (deg) Purpose WINU0550 370034 7706621 254 304 -85 265 RC Complete Exploration WINU0557 370963 7706878 247 250 -85 265 RC Complete Sterilisation WINU0558 370975 7707055 248 250 -85 265 RC Complete Sterilisation WINU0559 370837 7707197 249 250 -85 265 RC Complete Sterilisation WINU0560 370961 7707179 249 250 -85 265 RC Complete Sterilisation WINU0569 367276 7707533 258 252 -85 265 RC Complete Sterilisation WINU0570 367468 7707475 258 252 -85 265 RC Complete Sterilisation WINU0571 370511 7706451 253 304 -85 265 RC Complete Exploration WINU0572 370310 7705968 259 250 -85 265 RC Complete Exploration WINU0573 370156 7706079 258 304 -85 265 RC Complete Exploration WINU0574 370293 7706240 257 196 -85 265 RC Complete Exploration WINU0575 369843 7706201 255 312 -85 265 RC Complete Exploration WINU0576 369981 7706364 255 250 -85 265 RC Complete Exploration WINU0577 369994 7706217 256 250 -85 265 RC Complete Exploration WINU0578 369506 7706615 253 250 -85 265 RC Complete Exploration WINU0579 369667 7706487 253 250 -85 265 RC Complete Exploration WINU0580 368882 7706871 250 250 -85 265 RC Complete Sterilisation WINU0581 367658 7707415 260 252 -85 265 RC Complete Sterilisation WINU0582 367848 7707353 250 252 -85 265 RC Complete Sterilisation WINU0583 368038 7707293 250 252 -85 265 RC Complete Sterilisation WINU0584 367053 7707054 250 354 -85 265 RC Complete Sterilisation WINU0585 367244 7706994 250 252 -85 265 RC Complete Sterilisation WINU0586 367434 7706934 250 318 -85 265 RC Complete Sterilisation WINU0587 367625 7706874 250 360 -85 265 RC Complete Sterilisation WINU0588 367816 7706814 250 354 -85 265 RC Complete Sterilisation WINU0589 368007 7706753 250 438 -85 265 RC Complete Sterilisation WINU0590 367080 7707594 250 444 -85 265 RC Complete Sterilisation WINU0591 369068 7706437 253 250 -85 265 RC Complete Sterilisation WINU0592 369194 7706748 250 250 -85 265 RC Complete Sterilisation WINU0593 369044 7706735 250 250 -85 265 RC Complete Sterilisation WINU0594 368908 7706572 250 250 -85 265 RC Complete Sterilisation WINU0595 369369 7706462 250 250 -85 265 RC Complete Sterilisation WINU0596 368746 7706709 250 250 -85 265 RC Complete Sterilisation WINU0597 368583 7706845 250 250 -85 265 RC Complete Sterilisation WINU0598 368447 7706683 250 250 -85 265 RC Complete Sterilisation WINU0599 368421 7706981 250 250 -85 265 RC Complete Sterilisation WINU0603 369919 7706209 250 255 -70 90 RC Complete Exploration WINU0604 369912 7706284 250 279 -70 90 RC Complete Exploration WINU0605 369905 7706358 250 250 -70 90 RC Complete Exploration Page 23 of 25
Easting Northing Elevation Down hole Dip Azimuth Hole Drill hole Hole type Hole status (mE) (mN) (m RL) depth (m) (deg) (deg) Purpose WINU0606 369693 7706490 250 243 -70 90 RC Complete Exploration WINU0609 370430 7707534 250 292 -85 265 RC Complete Exploration WINU0611 370399 7707606 250 252 -85 265 RC Complete Exploration WINU0612 370437 7707459 250 282 -85 265 RC Complete Exploration WINU0621 370484 7706058 250 181 -85 265 RC Complete Exploration WINU0622 370190 7706547 250 220 -85 265 RC Complete Exploration WINU0623 369547 7706867 250 250 -70 85 RC Complete Exploration WINU0629 369393 7706941 250 50 -70 85 RC Abandoned Exploration WINU0641 367648 7708427 250 450 -85 85 RC Complete Sterilisation Page 24 of 25
Contacts media.enquiries@riotinto.com riotinto.com Follow @RioTinto on Twitter Media Relations, United Kingdom Media Relations, Australia Illtud Harri Jonathan Rose M +44 7920 503 600 T +61 3 9283 3088 M +61 447 028 913 David Outhwaite T +44 20 7781 1623 Matt Chambers M +44 7787 597 493 T +61 3 9283 3087 M +61 433 525 739 Media Relations, Americas Matthew Klar Jesse Riseborough T +1 514 608 4429 T +61 8 6211 6013 M +61 436 653 412 Media Relations, Asia Grant Donald T +65 6679 9290 M +65 9722 6028 Investor Relations, United Kingdom Investor Relations, Australia Menno Sanderse Natalie Worley T: +44 20 7781 1517 T +61 3 9283 3063 M: +44 7825 195 178 M +61 409 210 462 David Ovington Amar Jambaa T +44 20 7781 2051 T +61 3 9283 3627 M +44 7920 010 978 M +61 472 865 948 Group Company Secretary Joint Company Secretary Steve Allen Tim Paine Rio Tinto plc Rio Tinto Limited 6 St James’s Square Level 7, 360 Collins Street London SW1Y 4AD Melbourne 3000 United Kingdom Australia T +44 20 7781 2000 T +61 3 9283 3333 Registered in England Registered in Australia No. 719885 ABN 96 004 458 404 This announcement is authorised for release to the market by Rio Tinto’s Group Company Secretary. Page 25 of 25
Exhibit 99.10 Notice to ASX 2020 Half year results presentation 29 July 2020 Attached is the Rio Tinto 2020 half year results presentation to be given today by Rio Tinto chief executive Jean-Sébastien Jacques, and chief financial officer Jakob Stausholm. The presentation slides are also available at www.riotinto.com/invest/presentations/2020/half-year-results. The presentation will be webcast live at 6.30pm Australian Eastern Standard Time and can be accessed at www.riotinto.com/invest/presentations/2020/half-year-results. Page 1 of 2
Contacts media.enquiries@riotinto.com riotinto.com Follow @RioTinto on Twitter Media Relations, United Kingdom Media Relations, Australia Illtud Harri Jonathan Rose M +44 7920 503 600 T +61 3 9283 3088 M +61 447 028 913 David Outhwaite T +44 20 7781 1623 Matt Chambers M +44 7787 597 493 T +61 3 9283 3087 M +61 433 525 739 Media Relations, Americas Matthew Klar Jesse Riseborough T +1 514 608 4429 T +61 8 6211 6013 M +61 436 653 412 Media Relations, Asia Grant Donald T +65 6679 9290 M +65 9722 6028 Investor Relations, United Kingdom Investor Relations, Australia Menno Sanderse Natalie Worley T: +44 20 7781 1517 T +61 3 9283 3063 M: +44 7825 195 178 M +61 409 210 462 David Ovington Amar Jambaa T +44 20 7781 2051 T +61 3 9283 3627 M +44 7920 010 978 M +61 472 865 948 Clare Peever M: +44 7788 967 877 Group Company Secretary Joint Company Secretary Steve Allen Tim Paine Rio Tinto plc Rio Tinto Limited 6 St James’s Square Level 7, 360 Collins Street London SW1Y 4AD Melbourne 3000 United Kingdom Australia T +44 20 7781 2000 T +61 3 9283 3333 Registered in England Registered in Australia No. 719885 ABN 96 004 458 404 This announcement is authorised for release to the market by Rio Tinto’s Group Company Secretary. Page 2 of 2
2020 Half Year Results 29 July 2020
Cautionary and supporting statements This presentation has been prepared by Rio Tinto plc and Rio Tinto Limited (together with their subsidiaries, “Rio Tinto”). By accessing/attending this presentation you acknowledge that you have read and understood the following statement. Forward-looking statements This document, including but not limited to all forward-looking figures, contains certain “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. The words “intend”, “aim”, “project”, “anticipate”, “estimate”, “plan”, “believes”, “expects”, “may”, "would", “should”, "could", “will”, “target”, “set to”, "seek", "risk" or similar expressions, commonly identify such forward-looking statements. Examples of forward-looking statements include, among other things, those regarding business strategy, plans and objectives of management for future operations (including any statements related to the ongoing impact of the COVID-19 pandemic), estimated ore reserves, anticipated production or construction dates, costs, outputs and productive lives of assets or similar factors. Forward-looking statements involve known and unknown risks, uncertainties, assumptions and other factors set forth in this presentation which may cause the actual results, performance or achievements of Rio Tinto, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements which speak only as to the date of this presentation. Such forward-looking statements are based on numerous assumptions regarding Rio Tinto's present and future business strategies and the environment in which Rio Tinto will operate in the future. Important factors that could cause Rio Tinto's actual results, performance or achievements to differ materially from those in the forward-looking statements include levels of actual production during any period, market prices, ability to produce and transport products profitably, demand for our products, changes to the assumptions regarding the recoverable value of our tangible and intangible assets, the effect of foreign currency exchange rates on market prices and operating costs, operational problems, the actions of competitors, activities by governmental authorities, such as changes in taxation or regulation, political uncertainty and economic conditions in relevant areas of the world, the risks and uncertainties associated with the ongoing impacts of COVID-19 or other pandemic and other such risk factors identified in Rio Tinto's most recent Annual report and accounts in Australia and the United Kingdom and the most recent Annual report on Form 20-F filed with the United States Securities and Exchange Commission (the "SEC") or Form 6-Ks furnished to, or filed with, the SEC. The above list is not exhaustive. Forward-looking statements should, therefore, be construed in light of such risk factors and undue reliance should not be placed on forward-looking statements, particularly in light of the current economic climate and the significant volatility, uncertainty and disruption caused by the outbreak of COVID-19. Except as required by applicable regulations or law, Rio Tinto does not undertake any obligation to publicly update or revise any forward-looking statements, whether as a result of new information or future events. The Group cannot guarantee that its forward-looking statements will not differ materially from actual results. In this presentation all figures are US dollars unless stated otherwise. Disclaimer Neither this presentation, nor the question and answer session, nor any part thereof, may be recorded, transcribed, distributed, published or reproduced in any form, except as permitted by Rio Tinto. By accessing/ attending this presentation, you agree with the foregoing and, upon request, you will promptly return any records or transcripts at the presentation without retaining any copies. This presentation contains a number of non-IFRS financial measures. Rio Tinto management considers these to be key financial performance indicators of the business and they are defined and/or reconciled in Rio Tinto’s annual results press release and/or Annual report. Reference to consensus figures are not based on Rio Tinto’s own opinions, estimates or forecasts and are compiled and published without comment from, or endorsement or verification by, Rio Tinto. The consensus figures do not necessarily reflect guidance provided from time to time by Rio Tinto where given in relation to equivalent metrics, which to the extent available can be found on the Rio Tinto website. By referencing consensus figures, Rio Tinto does not imply that it endorses, confirms or expresses a view on the consensus figures. The consensus figures are provided for informational purposes only and are not intended to, nor do they, constitute investment advice or any solicitation to buy, hold or sell securities or other financial instruments. No warranty or representation, either express or implied, is made by Rio Tinto or its affiliates, or their respective directors, officers and employees, in relation to the accuracy, completeness or achievability of the consensus figures and, to the fullest extent permitted by law, no responsibility or liability is accepted by any of those persons in respect of those matters. Rio Tinto assumes no obligation to update, revise or supplement the consensus figures to reflect circumstances existing after the date hereof. 2 ©2020, Rio Tinto, All Rights Reserved
J-S Jacques Chief Executive
Extraordinary global challenges Restrictions on movements of people and goods and severe dislocations in certain (commodity) markets 80 200 180 60 Global flights, in thousands in flights, Global 160 40 140 120 20 100 bbl 0 80 US$/ -20 60 40 -40 20 -60 0 Jan-2020 Feb-2020 Mar-2020 Apr-2020 May-2020 Jun-2020 Jul-2020 WTI oil price, US$/bbl Global flights, 7 day rolling average (RHS) Source: Rio Tinto, Factset, Bloomberg, FlightRadar 4 ©2020, Rio Tinto, All Rights Reserved
A resilient performance in H1 2020 Health, safety & well being our top priority – good progress $9.6 billion $3.8 billion Underlying EBITDA Paid to shareholders2 47% & 21% $2.7 billion Underlying EBITDA margin & ROCE1 Corporate taxes paid $2.8 billion $1.2 billion Free cash flow Royalties3 $4.8 billion $2.7 billion Net debt Capital invested 1 Return on Capital Employed (ROCE) is defined as annualised underlying earnings excluding net interest divided by average capital employed (operating assets before net debt) 2 $3.6 billion in ordinary dividends and $0.2 billion in share buy backs 3 Government and private royalty expenses in H1 5 ©2020, Rio Tinto, All Rights Reserved
Financial resilience supports sustainability Cultural Heritage COVID-19 – Engaging with PKKP1, Traditional Owners – Fully embedded rigorous health and hygiene across our operations and Indigenous groups controls across Australia – Progressing a return to normal rosters where – Board review of heritage management process possible and permitted completed by October 2020 – Applying technology to overcome hurdles from – Contribute to Senate inquiry and support the restrictions e.g. virtual reality glasses in planned review of the Heritage Act of 1972 in Mongolia Western Australia by 31 July 2020 Climate Health, safety & well being – Execute on new emissions targets – Maintain focus during a period of significant changes in manning, work practices and – Climate embedded with strategy, portfolio and procedures. AIFR2 of 0.37 versus 0.42 in 2019 closure in ExCo – Manage additional challenges from changes in – Develop detailed work programs for our work practices post COVID-19 partnerships to reduce supply chain emissions – Support our communities in managing the impact of COVID-19 1 The Puutu Kunti Kurrama and Pinikura people 2 AIFR = all injury frequency rate 6 ©2020, Rio Tinto, All Rights Reserved
$3.8bn of cash returns paid in H1 2020 with $2.5bn in H2 $1.2bn $3.6bn + $2.5bn Sustaining capex Ordinary dividends paid 2020 interim dividend to be paid in September 2020 47% $1.5bn EBITDA margin Development capex $5.6bn +8% of operating TSR2 21% cash flow ROCE1 $0.3bn $0.2bn ERA fund transfer to trust Buy-backs3 $1.2bn Increase in net debt 1 Return on Capital Employed (ROCE) is defined as annualised underlying earnings before net interest divided by average capital employed (operating assets before net debt) 2 Total Shareholder Return (TSR) in USD from 1 January to 23 July 2020 for the DLC 3 $0.2 billion of on-market share buy-backs in Rio Tinto plc completed by 28 February 2020 Numbers have been rounded to the nearest $0.1 billion 7 ©2020, Rio Tinto, All Rights Reserved
Jakob Stausholm Chief Financial Officer
Resilient iron ore market in a turbulent world economy ... China’s crude steel production (Mt annualised) Iron Ore* (1% increase YoY) 140 Mtpa 5 Yr Range 5 Yr Average 2019 2020 62% price HY Average 120 1150 1100 100 1050 80 1000 950 60 900 40 850 20 800 750 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan-18 May-18 Sep-18 Jan-19 May-19 Sep-19 Jan-20 May-20 Seaborne Iron Ore supply run rate** (Mt annualised) – Resounding recovery in China’s steel demand and production to Mtpa Range 2016-2019 2019 2020 Average 2016-2019 record levels in June 1800 1700 – Weaker steel markets in Europe, US, Japan, Korea and Taiwan but 1600 diverted iron ore absorbed in China 1500 1400 – Solid seaborne supply from Australia. Brazil struggled to deliver 1300 and rest of the world modestly impacted by temporary COVID-19 1200 restrictions 1100 1000 – Scrap generation and processing also disrupted but recovery Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec underway * Per dry metric tonne, FOB basis. ** Major suppliers annualised, reported at 100%. Sources: Rio Tinto, Port Hedland, LBH, Mysteel, World Steel Association, Bloomberg, Baltic Exchange, Wood Mackenzie 9 ©2020, Rio Tinto, All Rights Reserved
... with very volatile prices in other key commodities Aluminium* Copper* TiO2 * (chloride slag) (-13% decrease YoY) (-11% decrease YoY) (+7% increase YoY) Price HY Average Price HY Average Price HY Average 850 2800 MW Premium (RHS) 550 320 500 2600 300 800 450 2400 400 280 750 2200 350 260 2000 300 700 250 240 1800 200 650 220 1600 150 1400 100 200 600 Jan-18 May-18 Sep-18 Jan-19 May-19 Sep-19 Jan-20 May-20 Jan-18 May-18 Sep-18 Jan-19 May-19 Sep-19 Jan-20 May-20 Very weak demand from automotive Price recovery initially driven by rapid Weakness in downstream paint and plastics and transport industries rebound in Chinese demand industries impacted feedstock demand from Q2 Product mix shift from Value Added Product Significant impact on supply from COVID-19 supply impact limited to temporary (VAP) to commodity grades COVID-19 especially in South America curtailments. Mine depletions a bigger factor Limited supply disruptions or curtailment Investor positioning switched from net short Some lag through supply chain between from COVID-19 to net long at end of period demand and market impact * Average LME price | YoY change reflects change in average half year price on previous corresponding period, aluminium price and Mid West premium are in $ per ton, copper in $ cents per lb and TiO2 in $ per ton Sources: Rio Tinto, Platts, Bloomberg, Baltic Exchange, TZMI 10 ©2020, Rio Tinto, All Rights Reserved
Very resilient financial results ($bn, except for per share data) H1 2020 H1 2019 Comparison Gross revenue 20.3 21.8 -7% Underlying EBITDA 9.6 10.3 -6% ROCE 21% 23% Cash flow from operations 5.6 6.4 -12% Free cash flow 2.8 3.9 -28% Underlying earnings 4.8 4.9 -4% Underlying earnings per share ($) 2.94 3.02 -3% Net earnings 3.3 4.1 -20% Ordinary dividend per share ($) 1.55 1.51 +3% Net debt 4.8 4.9 -1% 11 ©2020, Rio Tinto, All Rights Reserved
Stable EBITDA at constant prices and exchange Underlying EBITDA $ billion 10.3 0.6 0.3 9.9 0.1 0.2 0.1 0.2 0.3 0.2 9.6 Iron Ore -0.06 Aluminium -0.45 Copper -0.15 Other +0.05 H1 2019 Price Exchange Flexed H1 Volume Unit cash Energy Inflation Non-cash One-offs H1 2020 underlying 2019 and mix costs costs & underlying EBITDA underlying Evaluation/ EBITDA EBITDA other Other and one-offs variance includes movements in central costs, non-cash costs and Exploration & Evaluation costs 12 ©2020, Rio Tinto, All Rights Reserved
Temporary lower cash conversion $ billion -0.2 0.9 Temporary 4.9 4.8 -1.1 0.2 3.9 0.2 2.8 0.9 0.4 0.3 0.4 Capex / Working Joint venture Taxes Provisions Total Depreciation capital income / expensed/ / Other** dividend* paid Underlying earnings Free cashflow H1 2019 H1 2020 * Includes income and dividends related to equity accounted units and non controlling interests, ** Including lease principle payments, interest expenses versus payments, derivative payments and other 13 ©2020, Rio Tinto, All Rights Reserved
Iron Ore Strong operating performance at a time of high price H1 2020 H1 2019 2020 We remain even more committed Operating metrics comparison guidance to our relationship with communities Average realised price* $85.4 /t 0% via active engagement, following the events in the Juukan Gorge area Shipments (100% basis) 159.6mt + 3% 324-334Mt Operating cost / t** $14.5 / t -1% $14-15 / t Consistency in EBITDA and margin from strong performance and Financial metrics ($bn) resilient pricing Revenue 11.5 + 2% Operating cost guidance range EBITDA 7.7 + 2% unchanged, includes: Margin (FOB) 72% 0 pp – Additional costs associated with COVID-19 in 2020 of ~$0.50 / t Operating cash flow 5.5 + 4% Koodaideri Phase 1 and Robe JV Sustaining capex 0.6 + 18% 1.0-1.5 Sustaining development projects Replacement and growth capex 0.6 + 218% continue to progress. Primary approvals for Mesa H received ROCE 64% + 2pp July 2020 * Dry metric tonne, FOB basis | ** Unit costs are based on operating costs included in EBITDA and exclude royalties (state and third party), freight, depreciation, tax and interest. Operating cost guidance based on AUD:USD FX rate of 0.67 | Note: numbers reflect Pilbara operations and Dampier Salt. 14 ©2020, Rio Tinto, All Rights Reserved
Aluminium Stable operations and good cash conversion in challenging market H1 2020 H1 2019 2020 FCF of $0.6 billion despite Operating metrics comparison guidance challenging market conditions Average aluminium price* $1,849 / t - 15% Average alumina price** $ 264 / t - 30% Lower prices impacted EBITDA by Production – bauxite 28.4Mt + 8% 55-58Mt $0.5 billion, including product mix Production – alumina 4.0Mt + 3% 7.8-8.2Mt shift in primary metal Production – aluminium 1.6Mt - 2% 3.1-3.3Mt Stable operations across all three Canadian smelters – $1,196 / t - 15% Refer to p45 hot metal cash costs**** segments; bauxite, alumina and aluminium Financial metrics ($bn) Revenue 4.5 - 12% Commercial agility. Temporarily EBITDA 0.9 - 18% replaced VAP with re-melt products. Margin (integrated operations) 23% - 2pp Supports cash conversion Operating cash flow 1.1 + 4% Sustaining capex 0.4 - 3% Replacement and growth capex 0.1 - 72% ROCE 3% - 1pp * Realised price, including VAP and mid-west premium | ** Platts Alumina PAX FOB Australia | *** Excluding Dunkerque and Becancour smelters **** Operating costs defined as hot metal cash costs for the Canadian smelters (alumina at market price) 15 ©2020, Rio Tinto, All Rights Reserved
Copper & Diamonds Focus on productivity as price, grades and earthquake impact result H1 2020 H1 2019 2020 EBITDA and margin impacted by Operating metrics comparison guidance lower price, lower grades and Copper realised price 250 c/lb - 11% earthquake at Kennecott Production – mined copper 266kt - 5% 475-520kt Cash flow temporarily impacted by Production – refined copper 74kt - 43% 165-205kt Kennecott smelter shutdown and Production – diamonds 7.7Mct - 7% 12-14Mct flash converting furnace rebuild in Q2 Unit cost* 124 c/lb + 37% 120-135 c/lb OT underground preferred mine Financial metrics ($bn) design selected. Caving mining Revenue 2.1 - 28% method confirmed. Agreed preferred EBITDA 0.7 - 45% domestic power solution. Open pit continued uninterrupted Margin (product group ops) 39% - 7pp Operating cash flow - -96% Maiden Mineral Resource announced Sustaining capex 0.2 +1% at Winu project and new gold-copper Replacement and growth capex 0.7 + 6% mineralisation discovered 2 km east ROCE** 1% - 5pp of Winu * Unit costs for Kennecott, OT and Escondida utilises the C1 unit cost calculation where Rio Tinto has chosen Adjusted Operating Costs as the appropriate cost definition. C1 costs are direct costs incurred in mining and processing, plus site G&A, freight and realisation and selling costs. Any by-product revenue is credited against costs at this stage ** Total Product Group including evaluation projects/other 16 ©2020, Rio Tinto, All Rights Reserved
Energy & Minerals Steady performance with some COVID-19 constraints H1 2020 H1 2019 2020 Operational stability despite some Operating metrics comparison guidance COVID restrictions in Canada and IOC pellets price* $117 / t - 17% South Africa TiO2 slag price** $809 / t + 7% Commercial flexibility at IOC: Production – IOC 5.3Mt + 6% 10.5-12.0Mt – More concentrate in the product Production – TiO 0.6Mt - 7% 1.2-1.4Mt*** 2 supply for the Asian market Production – Borates 0.3Mt + 2% 0.5Mt – EBITDA margin of 44% Financial metrics ($bn) Revenue 2.3 - 8% Zulti South project remains on hold EBITDA 0.7 - 23% Margin (product group ops) 34% - 6pp Feasibility funding approved at Operating cash flow 0.4 - 39% Jadar lithium project Sustaining capex 0.1 -28% Simandou project progressing. Replacement and growth capex 0.0 -52% Collaborate with partners to ROCE**** 10% - 7pp optimise infrastructure elements * Wet metric tonne | **Chloride Slag, TZMI May 2020 forecast | *** Equity share. At lower end of guidance range | ****Total Product Group including evaluation projects/other 17 ©2020, Rio Tinto, All Rights Reserved
Disciplined allocation of capital Essential 1 sustaining capex Further cash returns to Compelling Ordinary shareholders growth 2 dividends Iterative 3 cycle of Debt management 18 ©2020, Rio Tinto, All Rights Reserved
Continue to invest $20bn over three years Capital expenditure profile Controlled ramp-up of investments $ billion continues. ~7.0 ~7.0 H1 2020 capex of $2.7 billion Depreciation ~6.0 - Sustaining capex of $1.2 billion 5.4 5.5 - Development and replacement 4.5 capex of $1.5 billion Capital portion of $1 billion climate-related spend included. Climate spend extends beyond capex guidance period 2.7 2.4 2.4 Sustaining capex of up to $3 1.8 billion per year, of which Pilbara Iron Ore is $1.0-1.5 billion per year 2017A 2018A 2019A 2020F 2021F 2022F Sustaining Pilbara replacement Pilbara replacement includes Other replacement Development Koodaideri, Robe River and H1 total capex October 2019 guidance Western Turner Syncline phase 2 mine developments from 2019 19 ©2020, Rio Tinto, All Rights Reserved
Maintained our balance sheet strength Net debt Balance sheet strength is an asset. $ billion Offers resilience and creates optionality 14.1 Gearing 10% and net debt to LTM^ EBITDA of 0.23 12.9 11.3 10.0 Operating cash flow of $5.6 billion 9.3 9.3 following $1 billion of taxes paid in June 8.0 9.6 2020 relating to 2019 profits 7.6 5.6 4.9 4.8 Fully absorbed the 2019 final dividend of $3.6 billion and share buy-back of $0.2 5.2 4.9 4.8 billion 3.8 3.7 -0.3 Jun-16 Dec-16 Jun-17 Dec-17 Jun-18 Dec-18 Jun-19 Dec-19 Jun-20 pro forma net debt* Reported net debt * Pro-forma net debt adjusts for the remainder of previously announced buy-backs from operations, lags in shareholder returns from disposal proceeds, Australian tax lag and disposal-related tax lag and the impact of IFRS 16 Leases accounting change for the prior periods. This lease accounting change is reflected in the June and December 2019 reported net debt ^LTM = Last Twelve Months 20 ©2020, Rio Tinto, All Rights Reserved
Shareholder returns based on a well defined pay-out policy Shareholder returns of 40-60% of underlying earnings on average $2.5 billion ordinary interim dividend, through the cycle $1.55 per share, up 3% year-on-year 53% pay-out ratio 160% 140% Primary decision taken by Board for final dividend 120% 100% Total pay-out has consistently exceeded the policy in the last four years 80% 60% 53% 40% 20% 0% 2016 2017 2018 2019 H1 2020 2016-2019 Ordinary dividend Additional return Return of disposal proceeds Interim ordinary dividend 21 ©2020, Rio Tinto, All Rights Reserved
Our investment case in action Our assets Our approach Our performance in H1 2020 Long life Sustainability (ESG) $4.8 billion underlying earnings Competitive Operational Excellence $2.7 billion of profit taxes paid + = Expandable Value over volume $1.2 billion royalty expenses1 Sustainable Capital discipline $2.7 billion invested in capital projects Strong balance sheet Counter-cyclical $3.8 billion dividends and share buy-backs2 Unique strength and resilience 1 Government and private royalty expenses 2 Cash returns (dividends and share buy-backs) are stated on a cash flow basis 22 ©2020, Rio Tinto, All Rights Reserved
J-S Jacques Chief Executive
Improved conditions but wide range of potential outcomes ahead A V-shaped recovery in China so far: high frequency data Current state of play 200 90 175 85 – China: improvement in conditions with good 150 80 performance in construction and infrastructure 125 75 % 100 70 sectors. Support for consumer confidence from 75 65 house prices and stock market 50 60 25 55 – Europe and US: re-opening started with visible 0 50 improvements taking place but from a low base 5-Jul 5-Apr 7-Jun 1-Mar 8-Mar 2-Feb 9-Feb 3-May 12-Apr 19-Apr 26-Apr 14-Jun 21-Jun 28-Jun 12-Jan 19-Jan 26-Jan 15-Mar 22-Mar 29-Mar 16-Feb 23-Feb 10-May 17-May 24-May 31-May – Other regions: still in earlier stages of handling Index Property sales Heavy truck sales the impact of COVID-19 Start year = 100 Subway passenger Rebar capacity utilizaition (RHS) A more tentative recovery in the rest of the world Path forward 1800 90% 1700 A wide variety of scenarios remain possible with 1600 80% outcomes driven by: 1500 Kt 1400 70% 1300 1. Rate of re-opening 1200 60% 1100 2. Efficacy of stimulus 1000 50% Utilization Capacity - -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 3. Risk of resurgence in infections and lock downs 10 Week from Lockdown US Steel Production (Kt) China Rebar Capacity Utilisation Source: Rio Tinto, Bloomberg, CEIC, Mysteel 24 ©2020, Rio Tinto, All Rights Reserved
Enhance resilience, strengthen partnerships and continue to adapt Resilience Partnerships Agile Strong balance sheet Access to resources COVID-19 tactical response Disciplined capital allocation Technology and R&D Rio Tinto post COVID-19 Access to markets Risk sharing New approach to growth Value over volume Climate change Market opportunities Major hazards and critical risks Communities People skills and capabilities 25 ©2020, Rio Tinto, All Rights Reserved
Financial, operational and commercial resilience Strong balance sheet & capital discipline A well tested and successful framework Access to markets Iron ore to China, Aluminium across North America Value over volume Free cash flow per share. Low operating costs People Health, safety & well being. Skills of the future Understanding and managing critical risks Supply chains, physical risk at assets and projects, climate action 26 ©2020, Rio Tinto, All Rights Reserved
Building our portfolio and creating options – $0.3 billion exploration and evaluation in H1 Exploration – Copper a priority – Winu, Resolution & Evaluation – New commodities including battery materials – Jadar lithium in Serbia – $1.5 billion development capital in H1 – Pilbara replacement: Koodaideri, West Angelas C&D, Investment Mesa mines B,C and H at Robe Valley – South Wall pushback at Kennecott – Oyu Tolgoi in Mongolia – Simandou – Technology breakthroughs for climate Partnerships and productivity – Ventures team and M&A watching brief – Mine tailings processing 27 ©2020, Rio Tinto, All Rights Reserved
Oyu Tolgoi Underground takes another step to first production Preferred mine design selected – lowering risk, providing optionality for extension – Block caving remains a viable mining option with pillars between panels to Hugo North ore body Longitudinal section address stability risks Remote technology – Design retains optionality for future extension at depth and material in pillars PanelPrimary 2 crusher 1 may be recoverable later in mine life Pillar Panel 1 Panel0 Pillar – First sustainable production between October 2022 to June 2023 with $6.6- 7.1 billion development capital for Panel 0, subject to potential COVID-19 related delays – Underground lateral development continues to achieve high development productivity (1,800 eqm per month H1 2020) Potential for extension of Panels 1 and 2 – Construction of underground materials handling system infrastructure impacted by COVID-19 restrictions with progress at approximately 40% of planned rates – Shafts 3 and 4 and non critical surface construction work areas are in care and maintenance – Definitive estimate to be delivered by year-end 28 ©2020, Rio Tinto, All Rights Reserved
Winu progressing with Maiden Resource and further positive results – Inferred Mineral Resource of 503 Mt at 0.45% CuEq (0.2% CuEq cutoff) and 188 Mt @ 0.68% CuEq (0.45% CuEq cutoff)* – Deposit open at depth as well as to the North and Southeast – Studies progressing - metallurgical testing and baseline studies well advanced – Mineralisation enables a relatively shallow open-pit mine with industry- standard processing technology – Subject to regulatory approvals, Traditional Owner and other consents, first production targeted for 2023 – Discovery of new gold-dominant mineralisation 2km east of Winu at the Three JVs in the Paterson Province include the Citadel JV with Antipa Minerals, the Waukarlycarly JV with Alloy Ngapakarra prospect Resources, and the West Paterson JV with Carawine Resources. – We also have three Joint Ventures in the Paterson Province, and have only explored in 2% of our tenements to date * Refer to the release to the ASX on 28 July 2020 "Rio Tinto reveals maiden Resource at Winu and new discovery”. The Competent Person responsible for the information in that release that relates to Mineral Resources and Exploration Results is Dr Julian Verbeek. Rio Tinto confirms that it is not aware of any new information or data that materially affects the information included in the market announcement, that all material assumptions and technical parameters underpinning the estimates in the market announcement continue to apply and have not materially changed, and that the form and context in which the Competent Person’s findings are presented have not been materially modified. 29 ©2020, Rio Tinto, All Rights Reserved
$38bn cash returns since 2016 including $2.5bn to be paid in H2 2020 $2.5bn $10bn $22bn + Sustaining capex Ordinary and special 2020 interim dividend dividends paid to be paid in September 2020 44% average EBITDA $55bn margin1 operating cash flows $11bn $67bn $4bn Development capex Buy-backs 27% 17% + $12bn of cash TSR3 average ROCE1 divestments (2016-H1 2020) 2 4 $10bn $10bn Buy-backs and special Reduction in net debt dividends from disposals 1 Average EBITDA margin and average ROCE from 2016 to H1 2020. Return on Capital Employed (ROCE) is defined as underlying earnings before net interest divided by average capital employed (operating assets before net debt) 2 $0.2 billion of on-market share buy-backs in Rio Tinto plc completed by 28 February 2020 | 3 Total Shareholder Return (TSR) in US$, CAGR from 1 January 2016 to 23 July 2020 for the DLC. 4 $10.4 billion reduction in net debt is the cash movement and is offset by a $1.4 billion increase from non-cash movements. This results in a $9 billion reduction in net debt from $13.8 billion at the end of 2015 Numbers have been rounded to the nearest $ billion 30 ©2020, Rio Tinto, All Rights Reserved
Appendices 29 July 2020
Lower aluminium and copper prices Underlying EBITDA H1 2020 vs H1 2019 $ million 12,000 10,250 Iron ore Iron & Titanium Diamonds Copper Aluminium* Other, net 1,000 10,000 (604) 8,000 130 0 6,000 ( 28) ( 47) ( 63) ( 148) 4,000 ( 448) -1,000 2,000 0 H1 2019 Price underlying EBITDA * Aluminium includes alumina and bauxite and includes movements in market and other premia 32 ©2020, Rio Tinto, All Rights Reserved
Only small variations in volumes across commodities Underlying EBITDA H1 2020 vs H1 2019 $ million 12,000 87 10,250 50 255 125 9,869 31 10,000 (604) (157) (106) (35) 8,000 (49) (55) (135) 6,000 4,000 Diamonds Gold Aluminium Copper Iron & Iron Ore Other Titanium 2,000 0 H1 2019 Price Exchange Energy Inflation Flexed Volumes underlying rates H1 2019 & Mix EBITDA underlying EBITDA Aluminium includes alumina and bauxite. Aluminium variance excludes profit impact of volumes lost related to Kitimat pot relining and ISAL preventative pot-line shutdown. 33 ©2020, Rio Tinto, All Rights Reserved
Iron Ore Very stable EBITDA Underlying EBITDA H1 2020 vs H1 2019 $ million 54 7,659 7,698 7,552 33 58 120 (38) (21) (60) 7,000 H1 2019 Price Exchange rates Energy Inflation Flexed H1 2019 Volumes and Mix Cash costs Other H1 2020 underlying underlying underlying EBITDA EBITDA EBITDA – We increased our iron ore shipments by 3% compared with 2019 first half, in line with – The gross sales revenue for Pilbara operations included freight revenue of $0.6 our solid operational performance. This occurred during a period of robust pricing for billion (2019 first half: $0.6 billion). our high-quality products, which was driven by strong demand from China and – We priced approximately 79% of our sales with reference toto the average index constraints in seaborne supply. price for the month of shipment. In 2020 first half, we priced approximately 14% of – Our Pilbara operations delivered an underlying FOB EBITDA margin of 72%, consistent sales by reference to the prior quarter’s average index lagged by one month, with with 2019 first half. the remainder sold either on current quarter average or on the spot market. – 2020 first half Pilbara unit cash costs were $14.5 per tonne (2019 first half: $14.6 per – Approximately 69% of our sales included freight and 31% on an FOB basis. tonne). Cost guidance for full year of $14-$15 per tonne includes $0.5 per tonne of – Other includes $228m reflecting the recovery from the fire at Cape Lambert A in unplanned one-off COVID-19 related costs (based on a A$:US$ exchange rate of 2019 first half partially offset by COVID-19 related cost of $(101)m. 0.67), which relate to the controls we have put in place to keep our people safe such as cleaning, additional flights, screening and roster changes. However, these were largely mitigated by productivity gains, lower diesel costs and a weaker Australian dollar. 34 ©2020, Rio Tinto, All Rights Reserved
Aluminium Lower prices partly offset by improved costs and higher bauxite volumes Underlying EBITDA H1 2020 vs H1 2019 $ million 1,127 925 1,000 166 113 22 750 31 (22) (55) (457) 0 H1 2019 Price Exchange rates Energy Inflation Flexed H1 2019 Volumes Cash cost Other H1 2020 underlying underlying & Mix reductions underlying EBITDA EBITDA EBITDA – Underlying EBITDA of $0.9 billion was 18% lower than 2019 first half. The weaker – The cash LME price averaged $1,595 per tonne, 13% lower than 2019 first half. In pricing environment, in particular for primary metal, weaker currencies, inflation and our key US market, the mid-West premium duty paid declined 41% to $249 per tonne energy prices impacted EBITDA by $0.4 billion. Underlying improvements from higher (2019 first half: $420 per tonne). bauxite volumes, lower costs, productivity improvements and lower input prices, – We aligned our product offering with market conditions, selling a higher percentage primarily for caustic soda and petroleum coke, contributed a $0.2 billion uplift, reflecting as standard ingot products (P1020) and a lower proportion as VAP: in 2020 first half, the resilience we have embedded in the business. VAP represented 40% of the primary metal we sold (2019 first half: 54%) and – This supported us to sustain our industry leading EBITDA margin at 23%, only slightly generated product premiums averaging $208 per tonne of VAP sold (2019 first half: lower than the first half of 2019 (25%). $242 per tonne). – The average realised aluminium price of $1,849 per tonne, 15% lower than 2019 first – Although we are broadly balanced in alumina, approximately 2.2 million tonnes of half ($2,174 per tonne). our legacy alumina sales contracts are exposed to a fixed linkage to the LME price. These contracts date back to 2005 or earlier, and the majority expire between 2023 and 2030. The opportunity loss from these legacy contracts was around $50 million in 2020 first half, compared with around $150 million in 2019 first half. 35 ©2020, Rio Tinto, All Rights Reserved
Copper & Diamonds Lower volumes due to lower grades, KUC earthquake and lower prices Underlying EBITDA H1 2020 vs H1 2019 $ million 1,213 1,184 1,250 59 35 (99) (24) (154) 670 (202) (138) (20) 250 H1 2019 Price Exchange rates Energy Inflation Flexed H1 Volumes and Cash cost KUC Other H1 2020 underlying 2019 Mix reductions Earthquake underlying EBITDA underlying EBITDA EBITDA – At $0.7 billion, our underlying EBITDA was 45% lower than 2019 first half. – Cash from our operating activities was $32 million, a $0.7 billion decline on 2019 first half, largely driven by: lower gold volumes from Oyu Tolgoi, lower volumes from – Price declines, due to weaker markets from the global COVID-19 pandemic, drove Kennecott following the earthquake, lower dividends from Escondida and lower EBITDA $0.1 billion lower, with an 11% decrease in realised copper prices to 250 US prices and volumes for our diamond business. cents per pound and a 39% decrease in realised diamond prices. – The lower prices were offset by productivity and cost improvements. Due to the – We also incurred a $0.1 billion one-off hit at Kennecott, where the asset was impacted rebuild of the flash converting furnace and planned smelter shutdown at Kennecott, by a 5.7 magnitude earthquake in mid-March. This resulted in the flash converting there was also a build-up in matte inventories, which will be reduced in the second furnace being offline and requiring a rebuild, in addition to the planned smelter half as the smelter comes back online. shutdown. – Free cash flow was an outflow of $0.9 billion, reflecting $0.9 billion of capital – Lower grades across most of our assets accounted for the remaining decline in expenditure, including ongoing activities at the Oyu Tolgoi underground project. EBITDA, partly offset by productivity improvements achieved across all assets. 36 ©2020, Rio Tinto, All Rights Reserved
Energy & Minerals Lower prices and one-off costs primarily relating to RBM Underlying EBITDA H1 2020 vs H1 2019 $ million 2,000 954 819 739 1,000 48 14 8 (157) (40) (16) (50) (22) 0 H1 2019 Price Exchange rates Energy Inflation Flexed H1 Volumes and Cash costs One-offs Other H1 2020 underlying 2019 Mix underlying EBITDA underlying EBITDA EBITDA – The business was stable and resilient from an operational perspective, despite some – Total shipments of pellets and concentrates were 9.4 million tonnes (our share 5.5 government-imposed COVID-19 restrictions, notably in Canada and South Africa. At Iron million tonnes), 14% higher than 2019 first half. Ore Company of Canada (IOC), we took advantage of stronger market conditions in Asia – Titanium dioxide feedstock production was 7% lower than 2019 first half. This was and switched our product mix, prioritising concentrate over pellets. due to community disruptions that resulted in a site-wide shutdown at RBM in – Underlying EBITDA of $0.7 billion was 23% lower than 2019 first half, primarily reflecting a December 2019, as well as COVID-19 government restrictions, which resulted in a $0.2 billion impact from lower pricing across the portfolio, with iron ore pellets being the further curtailing of the site. Operations have since resumed following the COVID-19 main contributor. restrictions. However, we are managing the situation carefully in the challenging South African environment, ensuring first and foremost the health and safety of our – We generated net cash of $0.4 billion from our operating activities and $0.3 billion of free workforce and contractors. cash flow, reflecting the pricing environment and our stable operational performance. Tax payments were $0.1 billion higher than in 2019 first half. – All nine furnaces at Rio Tinto Fer et Titane (RTFT) are in operation, with three of four furnaces in operation at RBM. We will continue to operate to market demand, – IOC production of pellets and concentrate was 6% higher than 2019 first half, with more ensuring appropriate feedstock for our customers and will decide to idle, modulate or concentrate in the product mix to match market demand. Production in 2019 first half was re-start the remaining idled furnace accordingly. also adversely affected by a flooding incident in June 2019. 37 ©2020, Rio Tinto, All Rights Reserved
Other movements in underlying EBITDA Underlying EBITDA impact Energy & Interest, $ million H1 2019 FX/ price Inflation Volumes Cash costs E&E Non-cash tax, other H1 2020 Other operations (88) 55 (5) 30 (53) - 35 16 (10) Exploration & Evaluation (net) (138) - - - - 27 - (10) (121) Other (370) 2 1 - (29) - (28) 181 (243) Total (596) 57 (4) 30 (82) 27 7 187 (374) – Other operations includes the Gove alumina refinery (curtailed in May 2014), Rio Tinto – Other costs of $243 million (pre-tax) were 34% lower than 2019 primarily due to: Marine and Legacy projects – lower restructuring, project and one-off central costs of $72m were 59% lower – Central exploration & evaluation costs of $121m were 12% lower than the 2019 first mainly due to lower provisions recognised in 2020 than first half 2019 in respect half. There have been significant impacts on exploration activities in some jurisdictions of legacy operations and the absence of operating model project costs in 2020 due to COVID-19. All projects have followed government requirements and guidelines – lower central pension costs, share-based payments and insurance costs were a while focusing on protecting well-being and health of local and indigenous credit of $102m (32% higher than 2019 first half) mainly due to higher insurance communities. premiums in 2020 with a lower offset from claims than the 2019 first half. – central costs of $273m were in line with the 2019 first half. 38 ©2020, Rio Tinto, All Rights Reserved
Group level financial guidance FY2020 FY2021 FY2022 CAPEX Total Group ~$6.0bn ~$7.0bn ~$7.0bn Sustaining Capex Group Up to $3.0bn Up to $3.0bn Up to $3.0bn Pilbara Sustaining Capex $1.0-1.5bn $1.0-$1.5bn $1.0-$1.5bn Effective tax rate 30% Returns Total returns of 40 – 60% of underlying earnings through the cycle 39 ©2020, Rio Tinto, All Rights Reserved
Group level financial guidance 2020 production guidance1 2020 costs $14-15/wmt (FOB), based on an Iron Ore Shipments 324 – 334mt (100% basis) Australian dollar exchange rate of $0.67 C&D C1 unit costs 120-135 c/llb Mined Copper 475 – 520kt Refined Copper 165 – 205kt Diamonds 12 – 14m carats Aluminium Modelling guidance provided for Bauxite 55 – 58mt Canadian smelters only (see slide 45) Alumina 7.8 – 8.2mt Aluminium 3.1 – 3.3mt Minerals TiO2 Lower end of 1.2 – 1.4 mt IOC 10.5 – 12.0 mt2 B2O3 ~0.5mt 1 Rio Tinto share unless otherwise stated. 2Total production of pellets and concentrates – mix can flex depending on marketing demand. 40 ©2020, Rio Tinto, All Rights Reserved
Oyu Tolgoi and Turquoise Hill Resources – key dates Rio Tinto: completion of 2020 OT Feasibility Study and updated 3 Mineral Reserves and Mineral Resources1 announced Rio Tinto: Definitive Estimate – projected to be complete 03 July 2020 Q4 2020 Q3 2020 TRQ: to disclose Technical Report2 1 Prepared in accordance with the requirements of the Australian Securities Exchange and the Canadian National Instrument 43101 Standards of Disclosure for Mineral Projects (“NI 43-101”) & CIM definition standards for Mineral Resources and Mineral Reserves (2014) due to change in mineral reserve 2 Will be prepared in accordance with the requirements of NI 43-101 and will be filed on SEDAR 3 Subject to any additional scheduling delays or increases in capital costs arising from the impacts of the ongoing COVID-19 pandemic 41 ©2020, Rio Tinto, All Rights Reserved
Debt maturity profile 30 June 2020 debt maturity profile* $ million Reported gross debt decreased by $0.7 billion to $13.6 billion at 30 June, 2,000 mainly attributable to the EUR 2020 1,800 bond redemption 1,600 Average outstanding debt maturity of 1,400 corporate bonds at ~13 years 1,200 (~ 10 years for Group debt) 1,000 No corporate bond maturities until 2024 800 Liquidity remains strong under stress 600 tests 400 200 $7.5bn back-stop Revolving Credit Facility undrawn throughout the crisis 0 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043+ External borrowings Leases *Numbers based on June 2020 accounting value. The debt maturity profile shows $1.2 billion of capitalised leases under IFRS 16. 42 ©2020, Rio Tinto, All Rights Reserved
Pro-forma net debt reconciliation FY2019 HY 2020 $bn $bn Reported net debt 3.7 4.8 Australian tax top-up in June of following year 1.0 Shareholder returns remaining relating to disposals 0.2 Proforma net debt 4.9 4.8 Note: $0.2bn in 2019 is the remaining share buyback relating to the disposal of coal assets 43 ©2020, Rio Tinto, All Rights Reserved
Modelling EBITDA Underlying EBITDA sensitivity H1 2020 ($m) impact on FY 2020 underlying average / rate EBITDA of 10% price/rate change Copper 249c/lb 276 Aluminium $1,595/t 447 Gold $1,645/oz 38 Iron ore (62% Fe CFR freight-adjusted) $85.1/dmt 1,892 A$ 0.66US$ 542 C$ 0.73US$ 209 Oil (Brent) $41/bbl 55 Note: The sensitivities give the estimated effect on underlying EBITDA assuming that each individual price or exchange rate moved in isolation. The relationship between currencies and commodity prices is a complex one and movements in exchange rates can affect movements in commodity prices and vice versa. The exchange rate sensitivities include the effect on operating costs but exclude the effect of revaluation of foreign currency working capital. 44 ©2020, Rio Tinto, All Rights Reserved
Modelling aluminium costs Canadian* smelting unit cash** cost sensitivity ($/t) Impact of $100/t change in each of the input costs below will have on our H1 2020 Canadian smelting unit cash cost of $1,196/t Alumina (FOB) $191 Green petroleum coke (FOB) $36 Calcined petroleum coke (FOB) $33 Coal tar pitch (FOB) $8 * Canadian smelters include all fully-owned smelters in Canada (Alma, AP60, Arvida, Grande-Baie, Kitimat, and Laterrière), as well as Rio Tinto’s share of the Becancour and Alouette smelters ** The smelting unit cash costs refer to all costs which have been incurred before casting, excluding depreciation but including corporate allocations and with alumina at market price, to produce one metric tonne of primary aluminium 45 ©2020, Rio Tinto, All Rights Reserved
Application of the returns policy Capital return considerations Comments – Operating cash flow of $5.6 billion 1 Results for H1 2020 – FCF of $2.8 billion – Underlying earnings down 4% to $4.8 billion – Focused on Oyu Tolgoi Long-term growth prospects – Investing in replacing high quality assets in Pilbara, Kennecott and Zulti-South – Ongoing exploration and evaluation programme – Winu Balance sheet strength – Strong balance sheet with net debt of $4.8 billion 40-60 per cent of underlying earnings through the cycle – Pay-out of 53% based on (i) robust financial performance in H1 (ii) strong balance sheet Balanced between growth and shareholder returns – Defined growth pipeline and a strong balance sheet providing capacity for shareholder return – Stable global growth, strong demand for premium products Outlook – Potential for continued price volatility 1 Free cash flow is defined as net cash generated from operating activities less purchases of PP&E less lease principal payments plus sales of PP&E. 46 ©2020, Rio Tinto, All Rights Reserved
COVID-19: Chinese High-frequency data Daily coal consumption of major electricity producers Daily property sales, recovering k tons k sqm 1,000 1,200 800 800 600 400 400 200 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2017 2018 2019 2020 2017 2018 2019 2020 Daily Baltic Dry Index % Weekly rebar capacity utilization Index 90 2800 80 2100 70 1400 60 700 The BDI is a composite of the Capesize, Panamax and Supramax Timecharter Averages. Weeks 0 50 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 2017 2018 2019 2020 2017 2018 2019 2020 ©2020, Rio Tinto, All Rights Reserved 46 Source: Market Analysis, CEIC, Wind, Mysteel
COVID-19: Chinese High-frequency data Daily food wholesale price index, easing Daily cement price index vs rebar price Index Index RMB per ton 160 180 5100 140 160 4400 120 140 3700 100 80 120 3000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan-18 Apr-18 Jul-18 Oct-18 Jan-19 Apr-19 Jul-19 Oct-19 Jan-20 Apr-20 Jul-20 2017 2018 2019 2020 daily cement price index daily rebar price (RHS) Weekly passenger car retail sales Weekly air con sales unit YoY% 200,000 500 400 160,000 300 120,000 200 100 80,000 0 -100 40,000 -200 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2017 2018 2019 2020 Offline sales Online sales ©2020, Rio Tinto, All Rights Reserved 47 Source: Market Analysis, CEIC, Wind, AVC
Technology at our core Sustaining our leading Deploying emerging World class talent cost positions technologies Delivering real Proven track record Tackling critical growth options in project study industry challenges through exploration and execution 49 ©2020, Rio Tinto, All Rights Reserved
Leading mining industry innovation R&D / Pilot Phase Deployment start date Deployment 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 Pilbara remote operations centre Autonomous trucks MAS1 / RTVis2 TM Autonomous drills Automation AutoHaulTM Tailings Press Filter tech AP45 Aluminium Smelter tech AP60 Aluminium Smelter tech TM Process Tech Process Elysis - GHG Free Aluminium Data analytics / data science 3 Data Open Data Environment 1 MAS – Mine Automation System. 2 RTVis – Rio Tinto’s 3D visualisation technology. 3 The Open Data Environment is a proprietary data platform allowing rapid development and use of data analytics, machine learning, Artificial Intelligence, automation and optimisation technologies across Rio Tinto. 50 ©2020, Rio Tinto, All Rights Reserved
Group Income Statement and Cash flow statement Rio Tinto Group Oyu Tolgoi and Turquoise Hill(1) Proforma Rio Tinto Group (excluding OT and TRQ)(2) Jun-20 Jun-19 Jun-20 Jun-19 Jun-20 Jun-19 YTD YTD YTD YTD YTD YTD Actual ($m) Actual ($m) Actual ($m) Actual ($m) Actual ($m) Actual ($m) Consolidated sales revenue 19,362 20,722 409 735 18,953 19,987 Profit/(loss) after tax for the period 3,451 2,931 (23) (2,054) 3,474 4,985 - attributable to owners of Rio Tinto (net earnings) 3,316 4,130 66 (641) 3,250 4,771 - attributable to non-controlling interests 135 (1,199) (89) (1,413) 224 214 Alternative performance measures (per Financial Information by Business Unit) Underlying EBITDA 9,640 10,250 89 306 9,551 9,944 Underlying Earnings 4,750 4,932 11 52 4,739 4,880 Cash flows from operations 8,826 9,429 29 287 8,797 9,142 Capital expenditure (2,693) (2,391) (548) (651) (2,145) (1,740) Oyu Tolgoi (OT) and Turquoise Hill Resources (TRQ) are fully consolidated in the Rio Tinto accounts – Rio Tinto’s economic ownership is 33.5%. These tables are provided to be able to see the OT/TRQ accounts on a stand alone basis. (1) Represents the amounts shown in the subsidiaries’ financial statements prepared in accordance with IFRS under Rio Tinto Group accounting policies, including fair value adjustments, and before intercompany eliminations. (2) Includes income and expenses arising in other Rio Tinto group companies from transactions with Oyu Tolgoi and Turquoise Hill. 51 ©2020, Rio Tinto, All Rights Reserved
Group Balance Sheet Rio Tinto Group Oyu Tolgoi and Turquoise Hill(1) Proforma Rio Tinto Group (excluding OT and TRQ) Jun-20 Dec-19 Jun-20 Dec-19 June-20 Dec-19 YTD YTD YTD YTD YTD YTD Actual ($m) Actual ($m) Actual ($m) Actual ($m) Actual ($m) Actual ($m) Non-current assets 69,376 70,499 10,155 9,589 59,221 60,910 Current assets 15,153 17,303 1,793 2,449 13,360 14,854 Total assets 84,529 87,802 11,948 12,038 72,581 75,764 Current liabilities (9,400) (11,125) (457) (493) (8,943) (10,632) Non-current liabilities (31,473) (31,435) (4,375)(2) (4,405)(2) (27,098) (27,030) Total liabilities (40,873) (42,560) (4,832) (4,898) (36,041) (37,662) Net assets 43,656 45,242 7,116 7,140 36,540 38,102 Equity attributable to owners of Rio Tinto 39,224 40,532 4,876 4,771 34,348 35,761 Attributable to non-controlling interests 4,432 4,710 2,240 2,369 2,192 2,341 Total equity 43,656 45,242 7,116 7,140 36,540 38,102 Alternative performance measures (per Financial Information by Business Unit) Operating assets 44,050 44,183 7,569 6,780 36,481 37,403 Net debt (4,826) (3,651) (2,693) (2,009) (2,133) (1,642) Equity attributable to owners of Rio Tinto 39,224 40,532 4,876 4,771 34,348 35,761 Oyu Tolgoi (OT) and Turquoise Hill Resources (TRQ) are fully consolidated in the Rio Tinto accounts – Rio Tinto’s economic ownership is 33.5%. These tables are provided to be able to see the OT/TRQ accounts on a stand alone basis. (1) Represents the amounts shown in the subsidiaries’ financial statements prepared in accordance with IFRS under Rio Tinto Group accounting policies, including fair value adjustments, and before intercompany eliminations. (2) Rio Tinto plc has provided a guarantee, known as the completion support undertaking (CSU), in favour of the Oyu Tolgoi LLC project finance lenders. At 30 June 2020 and 31 Dec 2019, US$4.3bn of project finance debt was outstanding under this facility. 52 ©2020, Rio Tinto, All Rights Reserved
Exhibit 99.11
Media Release

Rio Tinto progresses the Jadar lithium project to feasibility study stage
30 July 2020
Rio Tinto has approved an additional investment of almost $200 million to progress the next stage of the development of the lithium-borate Jadar project in Serbia. This will primarily fund the feasibility study, including the completion of detailed engineering designs, as well as permitting and land acquisition by the end of 2021, in line with the initial project schedule.
Rio Tinto Energy & Minerals Chief Executive Bold Baatar said “Rio Tinto’s lithium project pipeline is an important part of our vision to pursue opportunities which are part of the transition to a low-carbon future. We look forward to working closely with the Government of Serbia over the next eighteen months as we develop and validate our understanding of the project to the point when we can seek a final investment decision by the Board of Rio Tinto.”
The Jadar deposit contains high-grade mineralisation of boron and lithium supporting a long-life operation in the first quartile of operating costs for both products. The unique mineral, Jadarite was discovered by Rio Tinto geologists in 2004 near the city of Loznica in Western Serbia.
The company completed the detailed exploration of the Jadarite deposit in February 2020. The results of the drilling programme are now being incorporated into an update of the geological model. This update will facilitate a JORC Reserve declaration as part of the feasibility study and also a submission of Elaborate on Reserves, in accordance with the Serbian mineral code.
The development includes an underground mine, an industrial processing facility and all associated infrastructure. The project has the potential to supply the world with a significant amount of end-industrial products for lithium batteries for electric vehicles and energy storage facilities. It would also supply borates which are used in the manufacturing of detergents, cosmetics and other consumer goods.
In parallel, Rio Tinto has also started work on the commissioning of its lithium demonstration plant in the United States, which is extracting lithium from waste rock at its Boron mine in California. This plant could potentially produce 10 tonnes per year of lithium-carbonate needed in rechargeable batteries for electric vehicles and consumer electronics.
Page 1 of 2
Contacts
media.enquiries@riotinto.com
riotinto.com
Follow @RioTinto on Twitter
Media Relations, United Kingdom Illtud Harri M +44 7920 503 600 David Outhwaite T +44 20 7781 1623 M +44 7787 597 493 Media Relations, Americas Matthew Klar T +1 514 608 4429 Media Relations, Asia Grant Donald T +65 6679 9290 M +65 9722 6028 | Media Relations, Australia Jonathan Rose T +61 3 9283 3088 M +61 447 028 913 Matt Chambers T +61 3 9283 3087 M +61 433 525 739 Jesse Riseborough T +61 8 6211 6013 M +61 436 653 412 | ||||
Investor Relations, United Kingdom Menno Sanderse T: +44 20 7781 1517 M: +44 7825 195 178 David Ovington T +44 20 7781 2051 M +44 7920 010 978 | Investor Relations, Australia Natalie Worley T +61 3 9283 3063 M +61 409 210 462 Amar Jambaa T +61 3 9283 3627 M +61 472 865 948 | ||||
Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885 | Rio Tinto Limited Level 7, 360 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404 | ||||
Page 2 of 2