6-K
STARCORE INTERNATIONAL MINES LTD. (SHVLF)
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
Form 6-K
REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 UNDER THE SECURITIES EXCHANGE ACT OF 1934
For the month of April, 2022
Commission File Number 000-50922
STARCORE INTERNATIONAL MINES LTD.
(Translation of registrant’s name into English)
Suite 750 – 580 Hornby Street, Vancouver, B.C., Canada V6C 3B6
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
Form 20-F [X] Form 40-F [ ]
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): [ ]
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): [ ]
EXHIBITS
| Exhibit No. | Description |
|---|---|
| 99.1 | News Release dated April 6, 2022 |
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
STARCORE INTERNATIONAL MINES LTD.
Date: April 6, 2022
By:
/s/ Gary Arca Gary Arca Chief Financial Officer
sam-ex991_6.htm

April 6, 2022TSX: SAM
Starcore Provides Update on the Exploration in San Martin Mine and Opodepe Project in Sonora, Mexico
Vancouver, B.C. – Starcore International Mines Ltd. (TSX: SAM) (“Starcore” or “the Company”) is pleased to provide this update on the diamond drilling exploration work in San Martin Mine and Opodepe, Sonora, Mexico. The update for San Martin covers the exploration work done last year, and for the Opodepe Project, the update covers the exploration work started in October 2021 to the present day.
San Martin Mine in Queretaro, Mexico
A total of 9,410 meters were drilled in 2021 until the end of March, 2022 which focused on two areas of the mine: the first focusing on the northwest part of the operating mine, and the second searching for the extension of the orebodies of high - grade discovered during the 30 years of the mine’s life.
DRILLING HIGHLIGHTS – BDD AREA 33
| #8 – DC3221-10; 3.00 m @ | 7.36 g/t Au | 28 g/t Ag |
|---|---|---|
| #10 – DC3221-11; 8.00 m @ | 2.21 g/t Au | 26 g/t Ag |
| #12 – DC3221 – 12; 0.50 m @ | 16.27 g/t Au | 7 g/t Ag |
| #16 – DC3221 – 15; 0.60 m @ | 12.20 g/t Au | 10 g/t Ag |
See Figure 1.
Suite 750 – 580 Hornby Street, Box 113, Vancouver, British Columbia, Canada V6C 3B6
Telephone: (604) 602-4935 Fax: (604) 602-4936 e-mail: investor@starcore.com website: www.starcore.com
- 2 -

FIGURE 1. BDD AREA 33
This other area is in the eastern part of the operating mine. See Figure 2.
DRILLING HIGHLIGHTS BDD AREA 28
| #2 – DC2820 - 214; 2.40 m @ | 2.14 g/t Au | 57 g/t Ag |
|---|---|---|
| #3– DC2820 - 215; 2.95 m @ | 2.42 g/t Au | 21 g/t Ag |
| #4 – DC2820 - 217; 2.15 m @ | 8.08 g/t Au | 15g/t Ag |
- 3 -

FIGURE 2. BDD AREA 28
This new vein was discovered last year with 4 DD holes and the development works continue. This new vein is related to a vein discovered more than 15 years ago through a hole located 500 meters far away. Exploration continues with the development of drilling stations along the projection vein.
Opodepe Project in Sonora, Mexico
A total of 3,289.6 m has been drilled in 25 short holes. The first stage of drilling focused on the upper part of the veins of the zone and has been considered as recognition drilling. However, in this year 2022, the drilling is focused on the zone of the veins which the geologists have considered as favorable zones to find economic reserves. These holes will be longer than the first stage including two new veins, MIDAS and El ORO, both in the Teocuitla concession recently acquired by Starcore. See Figure 3.
DRILLING HIGHLIGHTS
| #1 – OPDS-21-001; 6.73 m @ | 4.79 g/t AuEq |
|---|---|
| #7– OPDS-21-018; 1.91 m @ | 2.30 g/t AuEq |
| #15 – OPDS-21-022; 2.19 m @ | 1.96 g/t AuEq |
See Figure 4.
- 4 -

Fig. 3 MAP SHOWING THE EXPLORED VEINS AND THE TWO NEW VEINS
- 5 -

Fig. 4 LONGITUDINAL SECTION MANA-SAN RICARDO VEIN – DDH
Salvador Garcia, B. Eng., a director of the Company and Chief Operating Officer, is the Company’s qualified person on the project as required under NI 43-101and has prepared the technical information contained in this press release.
About Starcore
Starcore International Mines is engaged in precious metals production with focus and experience in Mexico. This base of producing assets is complemented by exploration and development projects throughout North America. The Company is a leader in Corporate Social Responsibility and advocates value driven decisions that will increase long term shareholder value. You can find more information on the investor friendly website here: www.starcore.com.
ON BEHALF OF STARCORE INTERNATIONAL MINES LTD.
Signed “Robert Eadie” Robert Eadie, Chief Executive Officer
FOR FURTHER INFORMATION PLEASE CONTACT:
Robert Eadie
Telephone: (604) 602-4935 Toll Free: 1-866-602-4935 Email: readie@starcore.com
The Toronto Stock Exchange has not reviewed, nor does it accept responsibility for the adequacy or accuracy of this press release.