Caledonia Mining Corp Plc 6-K, filed Nov 14, 2023
Caledonia Mining Corp Plc (CMCL)
About this 6-K
Caledonia Mining Corp Plc filed this 6-K on November 14, 2023.
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, DC 20549
FORM 6-K
Report of Foreign Private Issuer
Pursuant to Rule 13a-16 or 15d-16
Of the Securities Exchange Act of 1934
For the month of November 2023
Commission File Number: 001-38164
CALEDONIA MINING CORPORATION PLC
(Translation of registrant's name into English)
B006 Millais House
Castle Quay
St Helier
Jersey JE2 3EF
(Address of principal executive offices)
Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F
Form 20-F ☒ Form 40-F ☐
INCORPORATION BY REFERENCE
Exhibits 99.1 to 99.4 included with this report on Form 6-K are expressly incorporated by reference into this report and are hereby incorporated by reference as exhibits to the Registration Statement on Form F-3 of Caledonia Mining Corporation Plc (File No. 333-255500), as amended or supplemented.
Signatures
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
CALEDONIA MINING CORPORATION PLC | |||
| (Registrant) | |||
| By: | /s/ John Mark Learmonth | ||
| Dated: November 14, 2023 |
Name: |
John Mark Learmonth | |
| Title: | CEO and Director |
||
Exhibit Index
| Exhibit | Description |
| 99.1 | Interim Financial Statements/Report |
| 99.2 | Interim MD&A |
| 99.3 | 52-109F2 - Certification of Interim Filings - CEO |
| 99.4 | 52-109F2 - Certification of Interim Filings - CFO |
Exhibit 99.1
Caledonia Mining Corporation Plc
| MANAGEMENT’S RESPONSIBILITY FOR FINANCIAL INFORMATION |
To the Shareholders of Caledonia Mining Corporation Plc:
Management has prepared the information and representations in this interim report. The unaudited condensed consolidated interim financial statements of Caledonia Mining Corporation Plc and its subsidiaries (the “Group”) have been prepared in accordance with International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board (“IASB”) and, where appropriate, these statements include some amounts that are based on best estimates and judgment. Management has determined such amounts on a reasonable basis in order to ensure that the unaudited condensed consolidated interim financial statements are presented fairly, in all material respects.
The accompanying Management Discussion and Analysis (“MD&A”) also includes information regarding the impact of current transactions, sources of liquidity, capital resources, operating trends, risks and uncertainties. Actual results in the future may differ materially from our present assessment of this information because future events and circumstances may not occur as expected.
The Group maintains adequate systems of internal accounting and administrative controls, within reasonable cost. Such systems are designed to provide reasonable assurance that relevant and reliable financial information are produced.
Management is responsible for establishing and maintaining adequate internal controls over financial reporting (“ICOFR”). Any system of ICOFR, no matter how well designed, has inherent limitations. Therefore, even those systems determined to be effective can provide only reasonable assurance with respect to financial statement preparation and presentation.
At September 30, 2023 management evaluated the effectiveness of the Group’s ICOFR and concluded that such ICOFR was effective based on the criteria set forth in the Internal Control Integrated Framework (2013) issued by the Committee of Sponsoring Organisations of the Treadway Commission.
The Board of Directors, through its Audit Committee, is responsible for ensuring that management fulfills its responsibilities for financial reporting and internal control. The Audit Committee is composed of three independent non-executive directors. This Committee meets periodically with management, the external auditor and internal auditor to review accounting, auditing, internal control and financial reporting matters.
These unaudited condensed consolidated interim financial statements have not been audited by the Group’s independent auditor.
The unaudited condensed consolidated interim financial statements for the period ended September 30, 2023 were approved by the Board of Directors and signed on its behalf on November 14, 2023.
| (Signed) J.M. Learmonth | (Signed) C.O. Goodburn | |
| Chief Executive Officer | Chief Financial Officer |
| 1 |
Caledonia Mining Corporation Plc
Consolidated statements of profit or loss and other comprehensive income
(in thousands of United States Dollars, unless indicated otherwise)
| For the | Three months ended | Nine months ended | ||||||||||||||||
| September 30, | September 30, | |||||||||||||||||
| Unaudited | Note | 2023 | 2022 | 2023 | 2022 | |||||||||||||
| Revenue | 41,187 | 35,840 | 107,653 | 107,904 | ||||||||||||||
| Royalty | (2,207 | ) | (1,796 | ) | (5,650 | ) | (5,408 | ) | ||||||||||
| Production costs | 7 | (20,452 | ) | (15,802 | ) | (61,028 | ) | (44,663 | ) | |||||||||
| Depreciation | 14 | (4,385 | ) | (2,670 | ) | (10,049 | ) | (7,372 | ) | |||||||||
| Gross profit | 14,143 | 15,572 | 30,926 | 50,461 | ||||||||||||||
| Other income | 62 | 14 | 127 | 17 | ||||||||||||||
| Other expenses | 8 | (701 | ) | (552 | ) | (2,800 | ) | (1,835 | ) | |||||||||
| Administrative expenses | 9 | (2,889 | ) | (2,789 | ) | (11,890 | ) | (8,068 | ) | |||||||||
| Cash-settled share-based expense | 10.1 | (27 | ) | (25 | ) | (298 | ) | (335 | ) | |||||||||
| Equity-settled share-based expense | 10.2 | (233 | ) | (94 | ) | (564 | ) | (176 | ) | |||||||||
| Net foreign exchange (loss) gain | 11 | (257 | ) | 1,559 | (2,334 | ) | 6,640 | |||||||||||
| Net derivative financial instrument expense | 12 | (102 | ) | 537 | (590 | ) | (1,160 | ) | ||||||||||
| Operating profit | 9,996 | 14,222 | 12,577 | 45,544 | ||||||||||||||
| Finance income | 13 | 21 | 7 | 30 | 10 | |||||||||||||
| Finance cost | 13 | (529 | ) | (16 | ) | (2,362 | ) | (310 | ) | |||||||||
| Profit before tax | 9,488 | 14,213 | 10,245 | 45,244 | ||||||||||||||
| Tax expense | (3,777 | ) | (4,018 | ) | (8,552 | ) | (14,051 | ) | ||||||||||
| Profit for the period | 5,711 | 10,195 | 1,693 | 31,193 | ||||||||||||||
| Other comprehensive income | ||||||||||||||||||
| Items that are or may be reclassified to profit or loss | ||||||||||||||||||
| Exchange differences on translation of foreign operations | (79 | ) | (699 | ) | (778 | ) | (858 | ) | ||||||||||
| Total comprehensive income for the period | 5,632 | 9,496 | 915 | 30,335 | ||||||||||||||
| Profit/(loss) attributable to: | ||||||||||||||||||
| Owners of the Company | 4,506 | 8,614 | (1,036 | ) | 25,932 | |||||||||||||
| Non-controlling interests | 1,205 | 1,581 | 2,729 | 5,261 | ||||||||||||||
| Profit for the period | 5,711 | 10,195 | 1,693 | 31,193 | ||||||||||||||
| Total comprehensive income attributable to: | ||||||||||||||||||
| Owners of the Company | 4,427 | 7,915 | (1,814 | ) | 25,074 | |||||||||||||
| Non-controlling interests | 1,205 | 1,581 | 2,729 | 5,261 | ||||||||||||||
| Total comprehensive income for the period | 5,632 | 9,496 | 915 | 30,335 | ||||||||||||||
| Earnings/(loss) per share | ||||||||||||||||||
| Basic earnings/ (loss) per share ($) | 0.24 | 0.65 | (0.07 | ) | 1.98 | |||||||||||||
| Diluted earnings/ (loss) per share ($) | 0.15 | 0.65 | (0.05 | ) | 1.98 | |||||||||||||
The accompanying notes on pages 6 to 37 are an integral part of these consolidated financial statements.
On behalf of the Board: “J.M. Learmonth”- Chief Executive Officer and “C.O. Goodburn”- Chief Financial Officer.
| 2 |
Caledonia Mining Corporation Plc
Consolidated statements of financial position
(in thousands of United States Dollars, unless indicated otherwise)
| Unaudited | September 30, | December 31, | ||||||||
| As at | Note | 2023 | 2022 | |||||||
| Assets | ||||||||||
| Property, plant and equipment | 14 | 172,784 | 178,983 | |||||||
| Exploration and evaluation assets | 15 | 92,831 | 17,579 | |||||||
| Deferred tax asset | 198 | 202 | ||||||||
| Total non-current assets | 265,813 | 196,764 | ||||||||
| Inventories | 16 | 18,826 | 18,334 | |||||||
| Derivative financial assets | 12.1 | 684 | 440 | |||||||
| Income tax receivable | - | 40 | ||||||||
| Prepayments | 17 | 5,093 | 3,693 | |||||||
| Trade and other receivables | 18 | 5,749 | 9,185 | |||||||
| Cash and cash equivalents | 19 | 10,775 | 6,735 | |||||||
| Assets held for sale | 20 | 13,397 | - | |||||||
| Total current assets | 54,524 | 38,427 | ||||||||
| Total assets | 320,337 | 235,191 | ||||||||
| Equity and liabilities | ||||||||||
| Share capital | 21 | 165,157 | 83,471 | |||||||
| Reserves | 137,587 | 137,801 | ||||||||
| Retained loss | (60,010 | ) | (50,222 | ) | ||||||
| Equity attributable to shareholders | 242,734 | 171,050 | ||||||||
| Non-controlling interests | 23,626 | 22,409 | ||||||||
| Total equity | 266,360 | 193,459 | ||||||||
| Liabilities | ||||||||||
| Provisions | 22 | 8,432 | 2,958 | |||||||
| Deferred tax liabilities | 3,067 | 5,123 | ||||||||
| Cash-settled share-based payment - long term portion | 10.1 | 229 | 1,029 | |||||||
| Loan note instruments - long term portion | 23 | 6,390 | - | |||||||
| Lease liabilities - long term portion | 93 | 181 | ||||||||
| Total non-current liabilities | 18,211 | 9,291 | ||||||||
| Cash-settled share-based payment - short term portion | 10.1 | 674 | 1,188 | |||||||
| Loan note instruments - short term portion | 23 | 665 | 7,104 | |||||||
| Lease liabilities - short term portion | 138 | 132 | ||||||||
| Derivative financial liabilities | 12.2 | 22 | - | |||||||
| Income tax payable | 2,841 | 1,324 | ||||||||
| Trade and other payables | 24 | 17,459 | 17,454 | |||||||
| Overdraft and term loans | 19 | 13,967 | 5,239 | |||||||
| Total current liabilities | 35,766 | 32,441 | ||||||||
| Total liabilities | 53,977 | 41,732 | ||||||||
| Total equity and liabilities | 320,337 | 235,191 | ||||||||
The accompanying notes on pages 6 to 37 are an integral part of these consolidated financial statements.
| 3 |
Caledonia Mining Corporation Plc
Consolidated statements of changes in equity
(in thousands of United States Dollars, unless indicated otherwise)
| Unaudited | Note | Share capital | Foreign currency translation reserve | Contributed surplus | Equity-settled share-based payment reserve | Retained loss | Total | Non-controlling interests (NCI) | Total equity | |||||||||||||||||||||||||
| Balance December 31, 2021 | 82,667 | (9,325 | ) | 132,591 | 14,513 | (59,150 | ) | 161,296 | 19,260 | 180,556 | ||||||||||||||||||||||||
| Transactions with owners: | ||||||||||||||||||||||||||||||||||
| Dividends declared | - | - | - | - | (5,383 | ) | (5,383 | ) | (1,814 | ) | (7,197 | ) | ||||||||||||||||||||||
| Share-based payments: | ||||||||||||||||||||||||||||||||||
| - Shares issued on settlement of incentive plan awards | 10.1 | 804 | - | - | - | - | 804 | - | 804 | |||||||||||||||||||||||||
| - Options exercised | 21 | - | - | - | 94 | - | 94 | - | 94 | |||||||||||||||||||||||||
| - Equity-settled share-based expense | 10.2 | - | - | - | 82 | - | 82 | - | 82 | |||||||||||||||||||||||||
| Total comprehensive income: | ||||||||||||||||||||||||||||||||||
| Profit for the period | - | - | - | - | 25,932 | 25,932 | 5,261 | 31,193 | ||||||||||||||||||||||||||
| Other comprehensive income for the period | - | (858 | ) | - | - | - | (858 | ) | - | (858 | ) | |||||||||||||||||||||||
| Balance at September 30, 2022 | 83,471 | (10,183 | ) | 132,591 | 14,689 | (38,601 | ) | 181,967 | 22,707 | 204,674 | ||||||||||||||||||||||||
| Balance December 31, 2022 | 83,471 | (9,787 | ) | 132,591 | 14,997 | (50,222 | ) | 171,050 | 22,409 | 193,459 | ||||||||||||||||||||||||
| Transactions with owners: | ||||||||||||||||||||||||||||||||||
| Dividends declared | - | - | - | - | (8,752 | ) | (8,752 | ) | (1,512 | ) | (10,264 | ) | ||||||||||||||||||||||
| Share-based payments: | ||||||||||||||||||||||||||||||||||
| - Shares issued on settlement of incentive plan awards | 10.1 | 351 | - | - | - | - | 351 | - | 351 | |||||||||||||||||||||||||
| - Equity-settled share-based expense | 10.2 | - | - | - | 564 | - | 564 | - | 564 | |||||||||||||||||||||||||
| Shares issued: | ||||||||||||||||||||||||||||||||||
| - Equity raise (net of transaction cost) | 21 | 15,658 | - | - | - | - | 15,658 | - | 15,658 | |||||||||||||||||||||||||
| - Bilboes acquisition | 5 | 65,677 | - | - | - | - | 65,677 | - | 65,677 | |||||||||||||||||||||||||
| Total comprehensive income: | ||||||||||||||||||||||||||||||||||
| (Loss)/ profit for the period | - | - | - | - | (1,036 | ) | (1,036 | ) | 2,729 | 1,693 | ||||||||||||||||||||||||
| Other comprehensive income for the period | - | (778 | ) | - | - | - | (778 | ) | - | (778 | ) | |||||||||||||||||||||||
| Balance at September 30, 2023 | 165,157 | (10,565 | ) | 132,591 | 15,561 | (60,010 | ) | 242,734 | 23,626 | 266,360 | ||||||||||||||||||||||||
| Note | 21 | |||||||||||||||||||||||||||||||||
The accompanying notes on pages 6 to 37 are an integral part of these consolidated financial statements.
| 4 |
Caledonia Mining Corporation Plc
Consolidated statements of cash flows
(in thousands of United States Dollars, unless indicated otherwise)
| Unaudited | Three months ended September 30, | Nine months ended September 30, | ||||||||||||||||
| Note | 2023 | 2022 | 2023 | 2022 | ||||||||||||||
| Cash inflow from operations | 25 | 16,963 | 11,717 | 17,629 | 41,901 | |||||||||||||
| Interest received | 21 | 7 | 30 | 10 | ||||||||||||||
| Finance costs paid | (331 | ) | (34 | ) | (1,762 | ) | (126 | ) | ||||||||||
| Tax paid | (2,158 | ) | (2,767 | ) | (4,504 | ) | (5,993 | ) | ||||||||||
| Net cash inflow from operating activities | 14,495 | 8,923 | 11,393 | 35,792 | ||||||||||||||
| Cash flows used in investing activities | ||||||||||||||||||
| Acquisition of property, plant and equipment | (9,573 | ) | (10,840 | ) | (20,175 | ) | (33,585 | ) | ||||||||||
| Acquisition of exploration and evaluation assets | (597 | ) | (311 | ) | (880 | ) | (947 | ) | ||||||||||
| Acquisition of Put options | (1 | ) | - | (812 | ) | - | ||||||||||||
| Net cash used in investing activities | (10,171 | ) | (11,151 | ) | (21,867 | ) | (34,532 | ) | ||||||||||
| Cash flows from financing activities | ||||||||||||||||||
| Dividends paid | (2,801 | ) | (2,709 | ) | (8,118 | ) | (7,197 | ) | ||||||||||
| Payment of lease liabilities | (36 | ) | (36 | ) | (108 | ) | (115 | ) | ||||||||||
| Shares issued – equity raise (net of transaction cost) | 21 | - | - | 15,658 | - | |||||||||||||
| Loan note instruments - Motapa payment | 23.1 | (563 | ) | - | (7,250 | ) | - | |||||||||||
| Loan note instruments - Solar bond issue receipts | 23.2 | - | - | 7,000 | - | |||||||||||||
| Repayment of Gold loan | - | - | - | (3,698 | ) | |||||||||||||
| Proceeds from call options | - | 415 | - | 239 | ||||||||||||||
| Net cash (used in)/from financing activities | (3,400 | ) | (2,330 | ) | 7,182 | (10,771 | ) | |||||||||||
| Net increase/ (decrease) in cash and cash equivalents | 924 | (4,558 | ) | (3,292 | ) | (9,511 | ) | |||||||||||
| Effect of exchange rate fluctuations on cash and cash equivalents | (1,209 | ) | (137 | ) | (1,396 | ) | (587 | ) | ||||||||||
| Net cash and cash equivalents at the beginning of the period | (2,907 | ) | 10,862 | 1,496 | 16,265 | |||||||||||||
| Net cash and cash equivalents at the end of the period | (3,192 | ) | 6,167 | (3,192 | ) | 6,167 | ||||||||||||
The accompanying notes on pages 6 to 37 are an integral part of these consolidated financial statements.
| 5 |
Caledonia Mining Corporation Plc
Notes to the Condensed Consolidated Interim Financial Statements
For the period ended September 30, 2023 and 2022
(in thousands of United States Dollars, unless indicated otherwise)
| 1 | Reporting entity |
Caledonia Mining Corporation Plc (“Caledonia” or the “Company”) is a company domiciled in Jersey, Channel Islands. The Company’s registered office address is B006 Millais House, Castle Quay, St Helier, Jersey, Channel Islands.
These unaudited condensed consolidated interim financial statements as at and for the nine months ended September 30, 2023 are of the Company and its subsidiaries (the “Group”). The Group’s primary involvement is in the operation of a gold mine and the exploration and development of mineral properties for precious metals.
Caledonia’s shares are listed on the NYSE American LLC stock exchange (symbol – “CMCL”). Depository interests in Caledonia’s shares are admitted to trading on AIM of the London Stock Exchange plc (symbol – “CMCL”). Caledonia listed on the Victoria Falls Stock Exchange (“VFEX”) (symbol – “CMCL”) on December 2, 2021. Caledonia voluntary delisted from the Toronto Stock Exchange (the “TSX”) on June 19, 2020. After the delisting the Company remains a Canadian reporting issuer and has to comply with Canadian securities laws until it demonstrates that Canadian shareholders represent less than 2% of issued share capital.
| 2 | Basis of preparation |
| (a) | Statement of compliance |
These unaudited condensed consolidated interim financial statements have been prepared in accordance with IAS 34 Interim Financial Reporting and do not include all the information required for full annual financial statements. Accordingly, certain information and disclosures normally included in the annual financial statements prepared in accordance with IFRS as issued by the IASB have been omitted or condensed. Selected explanatory notes are included to explain events and transactions that are significant to an understanding of the changes in the financial position and performance of the Group since the last annual consolidated financial statements as at and for the year ended December 31, 2022.
| (b) | Basis of measurement |
These unaudited condensed consolidated interim financial statements have been prepared on the historical cost basis except for:
| · | cash-settled share-based payment arrangements measured at fair value on grant and re-measurement dates; |
| · | equity-settled share-based payment arrangements measured at fair value on the grant date; and |
| · | derivative financial assets and derivative financial liabilities measured at fair value (the put options included in derivative financial assets and derivative financial liabilities were classified as level 1 in the fair value hierarchy). |
| (c) | Functional currency |
These unaudited condensed consolidated interim financial statements are presented in United States Dollar (“$” or “US Dollars” or “USD”), which is also the functional currency of the Company. All financial information presented in US Dollars has been rounded to the nearest thousand, unless indicated otherwise. Refer to note 11 for changes to Zimbabwean real-time gross settlement, bond notes or bond coins (“RTGS$”) and its effect on the consolidated statement of profit or loss and other comprehensive income.
| 6 |
Caledonia Mining Corporation Plc
Notes to the Condensed Consolidated Interim Financial Statements
For the period ended September 30, 2023 and 2022
(in thousands of United States Dollars, unless indicated otherwise)
| 3 | Use of accounting assumptions, estimates and judgements |
In preparing these unaudited condensed consolidated interim financial statements, management has made accounting assumptions, estimates and judgements that affect the application of the Group’s accounting policies and the reported amounts of assets, liabilities, income and expenses. Actual results may differ from these estimates. Estimates and underlying assumptions are reviewed on an ongoing basis. Changes in estimates are recognised prospectively.
| (a) | Judgement |
Judgement is required when assessing whether the Group controls an entity or not. Controlled entities are consolidated. Further information is given in notes 4 and 5.
| 4 | Significant accounting policies |
The same accounting policies and methods of computation, except as included below, have been applied consistently to all periods presented in these unaudited condensed consolidated interim financial statements as compared to the Group’s annual consolidated financial statements for the year ended December 31, 2022. In addition, the accounting policies have been applied consistently throughout the Group.
| (a) | Exploration and evaluation assets |
Qualifying exploration costs are capitalised as incurred. Costs incurred before the legal rights to explore are obtained are recognised in profit or loss. The costs related to speculative drilling on unestablished orebodies at the Blanket Mine, general administrative or overhead costs are expensed as incurred. Exploration and evaluation costs capitalised are disclosed under Exploration and evaluation assets (“E&E assets”). Qualifying direct expenditures include such costs as mineral rights, options to acquire mineral rights, materials used, surveying costs, drilling costs, payments made to contractors, direct administrative costs and depreciation on property, plant and equipment during the exploration phase. Costs not directly attributable to exploration and evaluation activities, including general administrative overhead costs, are expensed in the period they occur. Once the technical feasibility and commercial viability of the mining project have been determined, the property is considered to be a mine under development and moved to the mine development, infrastructure and other asset category within property, plant and equipment. Capitalised direct costs related to the acquisition, exploration and development of mineral properties remain capitalised, at their initial cost, until the properties to which they relate are ready for their intended use, sold, abandoned or management has determined there to be impairment. Exploration and evaluation assets are tested for impairment before the assets are transferred to mine development, infrastructure and other assets or when an indicator of impairment is identified. Exploration and evaluations assets are not depreciated.
The Group also makes assumptions and estimates regarding the technical feasibility and commercial viability of the mineral project and the possible impairment of E&E assets by evaluating whether it is likely that future economic benefits will flow to the Group, which may be based on assumptions about future events or circumstances e.g. such as the completion of a feasibility study indicating construction, funding and economic returns that are sufficient. Assumptions and estimates made may change if new information becomes available. If information becomes available suggesting that the recovery of expenditures is unlikely, the amount capitalised is written off in profit or loss in the period the new information becomes available. The recoverability of the carrying amount of exploration and evaluation assets depends on the availability of sufficient funding to bring the properties into commercial production, the price of the products to be recovered and the undertaking of profitable mining operations. As a result of these uncertainties, the actual amount recovered may vary significantly from the carrying amount.
| 7 |
Caledonia Mining Corporation Plc
Notes to the Condensed Consolidated Interim Financial Statements
For the period ended September 30, 2023 and 2022
(in thousands of United States Dollars, unless indicated otherwise)
| 4 | Significant accounting policies (continued) |
| (b) | Assets held for sale |
Non-current assets, or disposal groups comprising assets and liabilities, are classified as held for sale if it is highly probable that they will be recovered primarily through sale rather than through continuing use.
Such assets, or disposal groups, are generally measured at the lower of their carrying amount or fair value less costs to sell. Impairment losses on initial classification as held for sale or held for distribution and subsequent gains and losses on remeasurement are recognised in profit or loss.
Once classified as held for sale property, plant and equipment are no longer depreciated.
| (c) | Revenue |
| (i) | Fidelity Printers and Refiners Limited (“Fidelity”) |
Revenue from the sale of precious metals is recognised when the unrefined metal is accepted at the refinery (“Lodgment date”) by Fidelity, except for the portion earmarked for export to a refiner outside of Zimbabwe. Control is transferred and the receipt of proceeds is substantially assured at point of delivery at the end refiner with the responsibility to pay. Revenue for each delivery is measured at the London Base Metal Association Tuesday PM price post-delivery less 1.25% and the quantities are determined on Lodgment date. On average settlement occurs within 14 days of delivery from Fidelity and within 2 days from Al Etihad Gold Refinery DMCC.
| (ii) | Further refinement |
A portion of unrefined metals produced by Blanket is exported by Caledonia to a refiner outside Zimbabwe, which makes payment to Caledonia's bank account in Zimbabwe in USD. Unrefined gold continues to be processed at Fidelity a subsidiary of the Reserve Bank of Zimbabwe (“RBZ”), on a toll-treatment basis, in accordance with requirements of the Zimbabwe government for in-country refining and to allow the Zimbabwe authorities full visibility over the gold produced and exported by Caledonia. The resultant gold is exported under the gold dealing licence that is held by Fidelity to a refinery outside Zimbabwe which undertakes the final refining process. Caledonia receives the proceeds of the gold which it exports in its bank account in Zimbabwe within a few days of delivery to the final refiner. This arrangement in respect of production from Blanket complies with the current requirements to pay a 5 per cent royalty on gold sales and 1.25 per cent of gross sales which is payable to the Government of Zimbabwe and deducted from USD and RTGS$ revenues proportionately. Blanket continues to receive 75 per cent of its revenues in US Dollars and the balance in local currency.
Revenue for the unrefined metals exported to a refiner outside Zimbabwe from the sale of precious metals is recognised when the refiner outside of Zimbabwe receives the unrefined metals (“Lodgment date”). Control is transferred and the receipt of proceeds is substantially assured at the point of delivery. Revenue for each delivery is measured at the London Base Metal Association price post-delivery less a refining fee and the quantities are determined on Lodgment date. On average settlement occurs within two days of delivery.
| 8 |
Caledonia Mining Corporation Plc
Notes to the Condensed Consolidated Interim Financial Statements
For the period ended September 30, 2023 and 2022
(in thousands of United States Dollars, unless indicated otherwise)
| 5 | Tribute Arrangement and Mining Agreement and Bilboes Gold Limited acquisition |
On July 21, 2022 Caledonia Holdings Zimbabwe (Private) Limited (“CHZ”) entered into a Tribute Arrangement, and related Mining Agreement with Bilboes Holdings (Private) Limited (“Bilboes Holdings”) to mine its oxide and transitional ore (“tribute agreement”). This tribute agreement was specific to the Bilboes oxide mine and Bilboes Holdings was in care and maintenance at the date of the agreement.
In terms of the tribute agreement, Bilboes Holdings granted CHZ the right to mine the Bilboes oxide mine operations for the purpose of winning gold. In terms of this right, CHZ could operate the Bilboes oxide mine using a combination of Bilboes resources and their own, to extract oxides ore and dispose of the products for CHZ’s account.
Subject to the stipulation in the tribute agreement, CHZ assumed all responsibility in connection with the oxide mining claims as if CHZ were the owner thereof and Bilboes Holdings remained the registered holder of the mining claims until ownership passes in terms of the Sale and Purchase Agreement, mentioned below.
In terms of the tribute agreement, CHZ had the right to provide instructions over the scope of works for the Bilboes oxide mine in terms of an operational plan and also has the right to terminate the tribute agreement. CHZ, therefore, had the ability to affect the variable returns of the Bilboes oxide mine and to ensure its returns are in line with the expectation of recouping its “investment” (all funds provided) at a 25% internal rate of return.
The Tribute agreement came into effect on August 1, 2022, when the Ministry of Mines approval was received, control was obtained through contractual arrangement.
The Bilboes oxide mine did not have sufficient processes in place to operate the oxide mining operations and was reliant on CHZ to provide instructions on the mining operations to create the necessary outputs. The Bilboes oxide mine was assessed as an asset and liability acquisition and not a business combination in terms of IFRS 3 Business Combinations. Directly attributable costs of bringing the Bilboes oxide mine to the location and condition necessary for it to be capable of operating in the manner intended by CHZ amounted to $872 and was accounted for as Property, plant and equipment in the December 31, 2022 Consolidated Financial statements.
On June 27, 2023 the decision was taken to place the Bilboes oxide mine on care and maintenance with effect from October 1, 2023 as the cost related to removing the waste and access the orebody could exceed the benefit from the gold revenues to be received. The impairment loss that was recognised amounted to $851 on impairing the Bilboes oxide asset classified under Property, plant and equipment. Mining and metallurgical processing continued at the Bilboes oxide mine until the end of September 2023 when the contract miner's notice period came to an end. Leaching of material that has already been deposited on the leach pad will continue until end of the year. Oxide mining and processing will resume when the stripping of the waste for the sulphide project commences and can be economically justified. At the date of approval of the Unaudited condensed consolidated financial statements the tribute agreement remained in effect.
In addition to the Tribute arrangement, Caledonia signed a conditional agreement (the “Sale and Purchase Agreement”) to purchase 100% of Bilboes Gold Limited (“Bilboes Gold”) on July 21, 2022. Bilboes Gold is the holding company of Bilboes Holdings that owns high-grade sulphide resources and the mentioned mining claims to the oxide mine deposit. It was agreed that Caledonia would purchase Bilboes Gold for a consideration to be settled by issue to the sellers of 5,123,044 new shares in Caledonia, comprising initial consideration shares, escrow consideration shares and deferred consideration shares. In addition to the shares, the agreement was also to grant a 1 percent net smelter royalty (“NSR”) on the Bilboes sulphide mine’s revenues to one of the sellers, Baker Steel Resources Trust Limited (“Baker Steel”), essentially instead of a number of shares that they would have been entitled to should they have agreed to accept all of their consideration in shares. The Sale and Purchase Agreement would give Caledonia the rights to the sulphide project in addition to the right to mine the Bilboes oxide mine as a result of the tribute agreement.
On January 6, 2023, following the satisfaction of conditions precedent, Caledonia completed the acquisition of Bilboes Gold that gave right to further evaluate and exploit the sulphide resources in addition to the oxide mining activities agreed in the tribute agreement.
| 9 |
Caledonia Mining Corporation Plc
Notes to the Condensed Consolidated Interim Financial Statements
For the period ended September 30, 2023 and 2022
(in thousands of United States Dollars, unless indicated otherwise)
| 5 | Tribute Arrangement and Mining Agreement and Bilboes Gold Limited acquisition (continued) |
The acquisition of Bilboes Gold was classified as an asset and liability acquisition and not a business combination in terms of IFRS 3 Business Combinations.
Upon completion of the transaction on January 6, 2023, the initial consideration shares were issued, in the amount of 4,425,797 common shares, to the three sellers of Bilboes Gold Limited and the NSR agreement was signed.
The escrow consideration shares of 441,095 common shares of Caledonia were issued to one of the sellers in settlement of a separate commercial arrangement between its subsidiary and the holding company of another seller, and upon receipt by the Company of a “share adjustment notice” instructing the issue of the shares. The share adjustment notice was only issued once approval has been obtained from the Reserve Bank of Zimbabwe for such commercial arrangement. On March 30, 2023, 441,095 escrow shares were issued after the share adjustment notice was received.
Deferred consideration shares of 256,152 common shares of Caledonia were admitted to trading on the AIM on April 14, 2023. Total consideration shares issued for the acquisition of Bilboes Gold amounted to 5,497,293 shares with the value of the consideration shares set at US$65.677 million. The value of the initial consideration shares issued is based on the last trading day's closing share price on NYSE American LLC before completion of US$12.82 per share.
| Consideration paid (January 6, 2023) | $'000 | |||
| Equity issues | 65,677 | |||
| Initial consideration shared (4,425,797 at $12.82 per share) | 56,739 | |||
| Escrow shares issued (441,095 at $12.82 per share) | 5,655 | |||
| Deferred consideration shares | 3,283 | |||
| Bilboes oxide mine assets (pre-acquisition) | (872 | ) | ||
| Prepayments - Bilboes pre-effective date costs | 877 | |||
| Total net consideration | 65,682 | |||
| Recognised amounts of identifiable assets and liabilities assumed (January 6, 2023) | ||||
| Exploration and evaluation assets (note 15) | 73,198 | |||
| Inventories | 73 | |||
| Prepayments | 5 | |||
| Trade and other receivables | 802 | |||
| Cash and cash equivalents | 54 | |||
| Provisions | (4,466 | ) | ||
| Trade and other payables - external | (3,946 | ) | ||
| Lease liabilities | (28 | ) | ||
| Income tax payable | (10 | ) | ||
| 65,682 |
Acquisition-related costs
Included in administrative costs is an amount of $3.1 million payable to two advisors on the successful completion of the Bilboes Gold acquisition.
| 10 |
Caledonia Mining Corporation Plc
Notes to the Condensed Consolidated Interim Financial Statements
For the period ended September 30, 2023 and 2022
(in thousands of United States Dollars, unless indicated otherwise)
| 6 | Blanket Zimbabwe Indigenisation Transaction |
On February 20, 2012 the Group announced it had signed a Memorandum of Understanding (“MoU”) with the Minister of Youth, Development, Indigenisation and Empowerment of the Government of Zimbabwe pursuant to which the Group agreed that indigenous Zimbabweans would acquire an effective 51% ownership interest in the Zimbabwean company owning the Blanket Mine (also referred to herein as “Blanket” or “Blanket Mine” as the context requires) for a paid transactional value of $30.09 million. Pursuant to the above, members of the Group entered into agreements with each indigenous shareholder to transfer 51% of the Group’s ownership interest in Blanket Mine whereby it:
| • | sold a 16% interest to the National Indigenisation and Economic Empowerment Fund (“NIEEF”) for $11.74 million; |
| • | sold a 15% interest to Fremiro Investments (Private) Limited (“Fremiro”), which is owned by indigenous Zimbabweans, for $11.01 million; |
| • | sold a 10% interest to Blanket Employee Trust Services (Private) Limited (“BETS”) for the benefit of present and future managers and employees for $7.34 million. The shares in BETS are held by the Blanket Mine Employee Trust (“Employee Trust”) with Blanket Mine’s employees holding participation units in the Employee Trust; and |
| • | donated a 10% ownership interest to the Gwanda Community Share Ownership Trust (“Community Trust”). In addition, Blanket Mine paid a non-refundable donation of $1 million to the Community Trust. |
The Group facilitated the vendor funding of these transactions which is repaid by way of dividends from Blanket Mine. 80% of dividends declared by Blanket Mine are used to repay such loans and the remaining 20% unconditionally accrues to the respective indigenous shareholders. Following a modification to the interest rate on June 23, 2017, outstanding balances on these facilitation loans attract interest at a rate of the lower of a fixed 7.25% per annum payable quarterly or 80% of the Blanket Mine dividend in the quarter. The timing of the loan repayments depends on the future financial performance of Blanket Mine and the extent of future dividends declared by Blanket Mine. The Group related facilitation loans were transferred as dividends in specie intra-group and now the loans and most of the interest thereon is payable to the Company.
Accounting treatment
The directors of Caledonia Holdings Zimbabwe (Private) Limited (“CHZ”), a wholly-owned subsidiary of the Company, performed a reassessment using the requirements of IFRS 10: Consolidated Financial Statements (IFRS 10). It was concluded that CHZ should continue to consolidate Blanket Mine after the indigenisation. The subscription agreements with the indigenous shareholders have been accounted for accordingly as a transaction with non-controlling interests and as a share-based payment transaction.
| 11 |
Caledonia Mining Corporation Plc
Notes to the Condensed Consolidated Interim Financial Statements
For the period ended September 30, 2023 and 2022
(in thousands of United States Dollars, unless indicated otherwise)
| 6 | Blanket Zimbabwe Indigenisation Transaction (continued) |
Accounting treatment
The subscription agreements, concluded on February 20, 2012, were accounted for as follows:
| • | Non-controlling interests (“NCI”) were recognised on the portion of shareholding upon which dividends declared by Blanket Mine will accrue unconditionally to equity holders as follows: |
| (a) | 20% of the 16% shareholding of NIEEF; |
| (b) | 20% of the 15% shareholding of Fremiro; and |
| (c) | 100% of the 10% shareholding of the Community Trust. |
| • | This effectively means that NCI was initially recognised at 16.2% of the net assets of Blanket Mine, until the completion of the transaction with Fremiro, whereby the NCI reduced to 13.2% (see below). |
| • | The remaining 80% of the shareholding of NIEEF and Fremiro was recognised as NCI to the extent that their attributable share of the net asset value of Blanket Mine exceeds the balance on the facilitation loans, including interest. At September 30, 2023 the attributable net asset value did not exceed the balance on the respective loan account and thus no additional NCI was recognised. |
| • | The transaction with BETS is accounted for in accordance with IAS 19 Employee Benefits (profit sharing arrangement) as the ownership of the shares does not ultimately pass to the employees. The employees are entitled to participate in 20% of the dividends accruing to the 10% shareholding in Blanket Mine if they are employed at the date of such distribution. To the extent that 80% of the attributable dividends exceeds the balance on the BETS facilitation loan, they will accrue to the employees at the date of such declaration. |
| • | BETS is an entity effectively controlled and consolidated by Blanket Mine. Accordingly, the shares held by BETS are effectively treated as treasury shares in Blanket Mine and no NCI is recognised. |
Fremiro purchase agreement
On November 5, 2018 the Company and Fremiro entered into a sale agreement for Caledonia to purchase Fremiro’s 15% shareholding in Blanket Mine. On January 20, 2020 all substantive conditions to the transaction were satisfied. The Company issued 727,266 shares to Fremiro for the cancellation of their facilitation loan and purchase of Fremiro’s 15% shareholding in Blanket Mine. The transaction was accounted for as a repurchase of a previously vested equity instrument. As a result, the Fremiro share of the NCI of $3,600 was derecognised, shares were issued at fair value, the share-based payment reserve was reduced by $2,247 and the Company’s shareholding in Blanket Mine increased to 64% on the effective date.
Blanket Mine’s indigenisation shareholding percentages and facilitation loan balances
| Effective | NCI subject | Balance of facilitation loan # | ||||||||||||||||||
| USD | Shareholding | interest & NCI recognised | to facilitation loan | September 30, 2023 | December 31, 2022 | |||||||||||||||
| NIEEF | 16 | % | 3.2 | % | 12.8 | % | 8,489 | 9,414 | ||||||||||||
| Community Trust | 10 | % | 10.0 | % | 0.0 | % | - | - | ||||||||||||
| BETS ~ | 10 | % | - | * | - | * | 4,908 | 5,612 | ||||||||||||
| 36 | % | 13.2 | % | 12.8 | % | 13,397 | 15,026 | |||||||||||||
* The shares held by BETS are effectively treated as treasury shares (see above).
~ Accounted for under IAS19 Employee Benefits.
# Facilitation loans are accounted for as equity instruments and are accordingly not recognised as loans receivable.
| 12 |
Caledonia Mining Corporation Plc
Notes to the Condensed Consolidated Interim Financial Statements
For the period ended September 30, 2023 and 2022
(in thousands of United States Dollars, unless indicated otherwise)
| 6 | Blanket Zimbabwe Indigenisation Transaction (continued) |
Accounting treatment (continued)
The balance on the facilitation loans is reconciled as follows:
| 2023 | 2022 | |||||||
| Balance at January 1 | 15,026 | 16,712 | ||||||
| Interest incurred | 259 | 579 | ||||||
| Dividends used to repay loan | (1,888 | ) | (2,266 | ) | ||||
| Balance at September 30 | 13,397 | 15,025 | ||||||
Advance dividend loans and balances
In anticipation of completing the underlying subscription agreements, Blanket Mine agreed to advance dividend arrangements with NIEEF and the Community Trust. Advances made to the Community Trust against their right to receive dividends declared by Blanket Mine on their shareholding were as follows:
| • | a $2 million payment on or before September 30, 2012; |
| • | a $1 million payment on or before February 28, 2013; and |
| • | a $1 million payment on or before April 30, 2013. |
These advance payments were debited to a loan account bearing interest at a rate at the lower of a fixed 7.25% per annum, payable quarterly or the Blanket Mine dividend in the quarter to the advanced dividend loan holder. The loan is repayable by way of set-off of future dividends on the Blanket Mine shares owned by the Community Trust. Advances made to NIEEF as an advanced dividend loan before 2013 have been settled through Blanket Mine dividend repayments in 2014. The advance dividend payments were recognised as distributions to shareholders and they are classified as equity instruments. The loans arising are not recognised as loans receivables, because repayment is by way of uncertain future dividends. The final payment to settle the advance dividend loan to the Community Trust was made on September 22, 2021. Future dividends to the Community Trust will be unencumbered from the date the loan was settled in full.
| 7 | Production costs |
| 2023 | 2022 | |||||||
| Blanket - salaries and wages | 18,761 | 16,842 | ||||||
| Bilboes - salaries and wages | 2,323 | - | ||||||
| Blanket - consumable materials | 18,679 | 17,080 | ||||||
| Bilboes - consumable materials | 7,079 | - | ||||||
| Consumable materials – COVID-19 | - | 245 | ||||||
| Blanket - electricity costs | 9,010 | 6,926 | ||||||
| Bilboes - electricity costs | 516 | - | ||||||
| Safety | 856 | 748 | ||||||
| Cash-settled share-based expense (note 10.1(a)) | 435 | 441 | ||||||
| Blanket - On mine administration | 1,909 | 2,254 | ||||||
| Bilboes - On mine administration | 940 | - | ||||||
| Solar operations and maintenance services | 323 | - | ||||||
| Pre-feasibility exploration costs | 197 | 127 | ||||||
| 61,028 | 44,663 | |||||||
| 13 |
Caledonia Mining Corporation Plc
Notes to the Condensed Consolidated Interim Financial Statements
For the period ended September 30, 2023 and 2022
(in thousands of United States Dollars, unless indicated otherwise)
| 8 | Other expenses |
| 2023 | 2022 | |||||||
| Intermediated Money Transaction Tax* | 999 | 961 | ||||||
| Community and social responsibility cost | 923 | 348 | ||||||
| Impairment of property, plant and equipment (note 14) | 878 | 59 | ||||||
| Impairment of exploration and evaluation assets – Connemara North (note 15) | - | 467 | ||||||
| 2,800 | 1,835 | |||||||
| * | Intermediated Money Transfer Tax ("IMTT”) is tax chargeable in Zimbabwe on transfer of physical money, electronically or by any other means, between two or more persons. The presidential announcement made on May 7, 2022 increased the IMTT charges on all domestic foreign currency transfers from 2% to 4%. |
| 9 | Administrative expenses |
| 2023 | 2022 | |||||||
| Investor relations | 492 | 489 | ||||||
| Audit fee | 211 | 206 | ||||||
| Advisory services fees | 4,104 | 1,045 | ||||||
| Listing fees | 677 | 377 | ||||||
| Directors fees – Company | 480 | 411 | ||||||
| Directors fees – Blanket | 42 | 41 | ||||||
| Employee costs | 4,262 | 3,495 | ||||||
| Other office administration cost | 267 | 295 | ||||||
| Information Technology and Communication cost | 203 | 427 | ||||||
| Management liability insurance | 676 | 759 | ||||||
| Travel costs | 476 | 523 | ||||||
| 11,890 | 8,068 | |||||||
| 14 |
Caledonia Mining Corporation Plc
Notes to the Condensed Consolidated Interim Financial Statements
For the period ended September 30, 2023 and 2022
(in thousands of United States Dollars, unless indicated otherwise)
| 10 | Share-based payments |
| 10.1 | Cash-settled share-based payments |
| (a) | Restricted Share Units and Performance Units |
Certain management and employees within the Group are granted Restricted Share Units (“RSUs”) and Performance Units (”PUs”) pursuant to provisions of the 2015 Omnibus Equity Incentive Compensation Plan (“OEICP”). All RSUs and PUs were granted and approved at the discretion of the Compensation Committee of the Board of Directors.
RSUs vest three years after grant date given that the service conditions of the relevant employees have been fulfilled. The value of the vested RSUs is the number of RSUs vested multiplied by the fair market value of the Company’s shares, as specified by the OEICP, on the date of settlement.
PUs have a performance condition based on gold production and a performance period of one up to three years. The number of PUs that vest will be the relevant portion of the PUs granted multiplied by the performance multiplier, which will reflect the actual performance in terms of the performance conditions compared to expectations on the date of the award.
RSU holders are entitled to receive dividends over the vesting period. Such dividends will be reinvested in additional RSUs at the then applicable share price. PUs have rights to dividends only after they have vested.
RSUs and PUs allow for settlement of the vesting date value in cash or, subject to conditions, shares issuable at fair market value or a combination of both at the discretion of the unitholder.
The fair value of the RSUs at the reporting date was based on the Black Scholes option valuation model less the fair value of the expected dividends during the vesting period multiplied by the performance multiplier expectation. The fair value of the PUs at the reporting date was based on the Black Scholes option valuation model. At the reporting date it was assumed that there is a 93%-100% probability that the performance conditions will be met and therefore a 93%-100% (2022: 93%-100%) average performance multiplier was used in calculating the estimated liability.
The liability as at September 30, 2023 amounted to $903 (December 31, 2022: $2,217). Included in the liability as at September 30, 2023 is an amount of $435 (2022: $441) that was expensed and classified as production costs; refer to note 7. The cash-settled share-based expense for PUs for the period amounted to $298 (2022: $335). During the period PUs to the value of $351 were settled in share capital (net of employee tax) (2022: $804) with the employee tax portion recognised in profit or loss.
| 15 |
Caledonia Mining Corporation Plc
Notes to the Condensed Consolidated Interim Financial Statements
For the period ended September 30, 2023 and 2022
(in thousands of United States Dollars, unless indicated otherwise)
| 10 | Share-based payments (continued) |
| 10.1 | Cash-settled share-based payments (continued) |
| (a) | Restricted Share Units and Performance Units (continued) |
The following assumptions were used in estimating the fair value of the cash-settled share-based payment liability on September 30:
| September 30, 2023 | December 31, 2022 | |||||||||||||||
| RSUs | PUs | RSUs | PUs | |||||||||||||
| Risk free rate | 4.6 | % | 4.6 | % | 3.9 | % | 3.9 | % | ||||||||
| Fair value (USD) | 9.82 | 9.86 | 12.52 | 12.42 | ||||||||||||
| Share price (USD) | 9.82 | 9.86 | 12.40 | 12.42 | ||||||||||||
| Performance multiplier percentage | - | 93-100% | - | 93-100% | ||||||||||||
| Volatility | - | 0.83 | 1.29 | 0.91 | ||||||||||||
| Share units granted: | RSUs | PUs | RSUs | PUs | ||||||||||||
| Grant - January 11, 2019 | - | - | - | 95,740 | ||||||||||||
| Grant - March 23, 2019 | - | - | - | 28,287 | ||||||||||||
| Grant - June 8, 2019 | - | - | - | 14,672 | ||||||||||||
| Grant - January 11, 2020 | 17,585 | 76,601 | 17,585 | 114,668 | ||||||||||||
| Grant - March 31, 2020 | - | 1,971 | - | 1,971 | ||||||||||||
| Grant - June 1, 2020 | - | 1,740 | - | 1,740 | ||||||||||||
| Grant - September 9, 2020 | - | 1,611 | - | 1,611 | ||||||||||||
| Grant - September 14, 2020 | - | 20,686 | - | 20,686 | ||||||||||||
| Grant - October 5, 2020 | - | 514 | - | 514 | ||||||||||||
| Grant - January 11, 2021 | - | 78,875 | - | 78,875 | ||||||||||||
| Grant - April 1, 2021 | - | 770 | - | 770 | ||||||||||||
| Grant - May 14, 2021 | - | 2,389 | - | 2,389 | ||||||||||||
| Grant - June 1, 2021 | - | 1,692 | - | 1,692 | ||||||||||||
| Grant - June 14, 2021 | - | 507 | - | 507 | ||||||||||||
| Grant - August 13, 2021 | - | 2,283 | - | 2,283 | ||||||||||||
| Grant - September 1, 2021 | - | 553 | - | 553 | ||||||||||||
| Grant - September 6, 2021 | - | 531 | - | 531 | ||||||||||||
| Grant - September 20, 2021 | - | 526 | - | 526 | ||||||||||||
| Grant - October 1, 2021 | - | 2,530 | - | 2,530 | ||||||||||||
| Grant - October 11, 2021 | - | 500 | - | 500 | ||||||||||||
| Grant - November 12, 2021 | - | 1,998 | - | 1,998 | ||||||||||||
| Grant - December 1, 2021 | - | 936 | - | 936 | ||||||||||||
| Grant - January 11, 2022 | - | 96,359 | - | 96,359 | ||||||||||||
| Grant - January 12, 2022 | - | 825 | - | 825 | ||||||||||||
| Grant - May 13, 2022 | - | 2,040 | - | 2,040 | ||||||||||||
| Grant - June 1, 2022 | - | 1,297 | - | 1,297 | ||||||||||||
| Grant - July 1, 2022 | - | 2,375 | - | 2,375 | ||||||||||||
| Grant - October 1, 2022 | - | 2,024 | - | 2,024 | ||||||||||||
| Grant - April 7, 2023 | - | 79,519 | - | - | ||||||||||||
| Grant - May 15, 2023 | - | 581 | - | - | ||||||||||||
| Grant -June 1, 2023 | - | 617 | - | - | ||||||||||||
| Grant June 7, 2023 | - | 572 | - | - | ||||||||||||
| Grant - 10 August 2023 | - | 5,514 | - | - | ||||||||||||
| Grant - 1 September 2023 | - | 1,617 | - | - | ||||||||||||
| RSU dividends reinvested | 1,980 | - | 1,980 | - | ||||||||||||
| Settlements/terminations | (19,565 | ) | (212,447 | ) | - | (254,491 | ) | |||||||||
| Total awards | - | 178,106 | 19,565 | 224,408 | ||||||||||||
| 16 |
Caledonia Mining Corporation Plc
Notes to the Condensed Consolidated Interim Financial Statements
For the period ended September 30, 2023 and 2022
(in thousands of United States Dollars, unless indicated otherwise)
| 10 | Share-based payments (continued) |
| 10.2 | Equity-settled share-based payments |
| (a) | EPUs |
EPUs have a performance condition based on gold production, average normalised controllable cost per ounce of gold and a performance period of up to three years. The number of EPUs that vest will be the relevant portion of the EPUs granted multiplied by the performance multiplier, which will reflect the actual performance in terms of the performance conditions compared to expectations on the date of the award.
EPUs have rights to dividends only after they have vested.
The shares issued are subject to a minimum holding period of until at least the first anniversary of the EPUs vesting date.
The fair value of the EPUs at the reporting date was based on the Black Scholes option valuation model less the fair value of the expected dividends during the vesting period multiplied by the performance percentage. At the reporting date it was assumed that there is a 100% probability that the performance conditions will be met and therefore a 100% performance multiplier was used in calculating the expense. The equity-settled share-based expense for EPUs as at September 30, 2023 amounted to $564 (2022: $176).
The following assumptions were used in estimating the fair value of the equity-settled share-based payment liability on:
| Grant date | January 24, 2022 | April 7, 2023 | ||||||
| Number of units - granted date and reporting date | 130,380 | 93,035 | ||||||
| Share price (USD) - grant date | 11.50 | 16.91 | ||||||
| Fair value (USD) - grant date | 10.15 | 15.33 | ||||||
| Performance multiplier percentage at December 31, 2023 | 100 | % | 100 | % |
| 11 | Net foreign exchange (loss) gain |
On October 1, 2018 the RBZ issued a directive to Zimbabwean banks to separate foreign currency from RTGS$ in the accounts held by their clients and pegged the RTGS$ at 1:1 to the US Dollar. On February 20, 2019 the RBZ issued a further monetary policy statement, which allowed inter-bank trading between RTGS$ and foreign currency. The interbank rate was introduced at 2.5 RTGS$ to 1 US Dollar and traded at 5,546.07 RTGS$ to 1 US Dollar as at September 30, 2023 (December 31, 2022: 684.33 RTGS$). The US dollar has remained the primary currency in which the Group’s Zimbabwean entities operate and the functional currency of these entities.
| 17 |
| Caledonia Mining Corporation Plc |
| For the period ended September 30, 2023 and 2022 |
| (in thousands of United States Dollars, unless indicated otherwise) |
| Additional information |
| 11 | Net foreign exchange (loss) gain (continued) |
In June 2021 the RBZ announced that companies that are listed on the Victoria Falls Stock Exchange (“VFEX”) will receive 100% of the revenue arising from incremental production in US Dollars. Blanket has subsequently received confirmation that the “baseline” level of production for the purposes of calculating incremental production is 148.38 Kg per month (approximately 57,000 ounces per annum). The payment of the increased US Dollars proceeds for incremental production was applied from July 1, 2021. In December 2021, Caledonia obtained a secondary listing on the VFEX and Blanket received all amounts due in terms of that revised policy. The CMCL listing on the VFEX enabled Blanket to receive approximately 71.5% of its total revenue in US Dollars and the balance in RTGS$.
On February 3, 2023, the RBZ issued Exchange control directive RY002/2023 stating that with effect from February 6, 2023, the US$ export retention threshold across all sectors, including companies listed on the VFEX, had been standardized to 75% of export proceeds. The incremental export incentive scheme was discontinued on February 1, 2023.
The Company participated in the foreign currency auction introduced by the Zimbabwean Government to exchange RTGS$ for US Dollars up to June 15, 2021 and again from August 2023.
The table below illustrates the effect the weakening of the RTGS$ and other foreign currencies had on the consolidated statement of profit or loss and other comprehensive income.
| 2023 | 2022 | |||||||
| Unrealised foreign exchange gain | 2,477 | 12,728 | ||||||
| Realised foreign exchange loss* | (4,811 | ) | (6,088 | ) | ||||
| Net foreign exchange (loss) gain | (2,334 | ) | 6,640 | |||||
* Realised foreign exchange losses were predominantly recognised on Bullion sales receivables, bank balances and RTGS$ VAT.
| 12 | Derivative financial instruments |
The fair value of derivative financial instruments not traded in an active market is determined by using valuation techniques. These valuation techniques maximize the use of observable market data where available. The company did not apply hedge accounting to the derivative financial instruments and all fair value losses were recorded in the consolidated statements of profit or loss and other comprehensive income. Transaction costs are recognised in profit or loss as incurred.
| Derivative financial instrument expenses | 2023 | 2022 | ||||||||||
| Put options | 12.1 | (a) | 568 | – | ||||||||
| Gold purchase options | 12.2 | (a) | 22 | – | ||||||||
| Cap and collar options and Call options | 12.2 | (b) | – | (240 | ) | |||||||
| Gold loan | 12.2 | (c) | – | 832 | ||||||||
| Call options (December 13, 2021) | 12.2 | (c) | – | (228 | ) | |||||||
| Call options transaction costs (March 9, 2022) | 12.2 | (b) | – | 796 | ||||||||
| 590 | 1,160 | |||||||||||
| 18 |
| Caledonia Mining Corporation Plc |
| For the period ended September 30, 2023 and 2022 |
| (in thousands of United States Dollars, unless indicated otherwise) |
| Additional information |
| 12 | Derivative financial instruments (continued) |
| 12.1 | Derivative financial assets |
| 2023 | December 31, 2022 | |||||||||||
| Put options | 12.1 | (a) | 684 | 440 | ||||||||
| 684 | 440 | |||||||||||
| (a) | Put options |
On December 22, 2022 the Company purchased zero cost put options to hedge 16,672 ounces of gold over a period of five months from December to May 2023 at a strike price of $1,750.
On May 22, 2023 the Company purchased zero cost put options to hedge 28,000 ounces of gold over a period of seven months from June to December 2023 at a strike price of $1,900.
| 12.2 | Derivative financial liabilities |
| 2023 | December 31, 2022 | |||||||||||
| Gold purchase options | 12.2 | (a) | 22 | – | ||||||||
| Cap and collar options and Call options | 12.2 | (b) | – | – | ||||||||
| Call options (December 13, 2021) | 12.2 | (c) | – | – | ||||||||
| 22 | – | |||||||||||
| (a) | Gold purchase options |
On September 29, 2023 and October 6, 2023 the Company purchased two gold purchase options of 1,000 ounces each at a market price of $1,875 and $1,841 per ounce. The gold purchase options were purchased when the gold price was below $1,900 per ounce at the date of gold revenue delivery. This was done to match the expiry date of the Call options expiring on October 26, 2023 with the date of the gold sales from Blanket, by buying the gold options, in the event that the gold price was below $1,900 at date of pricing of the gold revenue sales by Blanket.
| (b) | Gold loan and Call options |
On December 13, 2021 the Company entered into two separate gold loan and option agreements with Auramet International LLC (“Auramet”).
In terms of the agreements the Group:
| · | received $3 million less transaction costs from Auramet at inception of the Gold loan agreement; |
| · | is required to make two deliveries of 925 ounces each on May 31, 2022 and June 30, 2022 in repayment of the Gold loan or pay the equivalent in cash; and |
| · | granted Call options on 6,000 ounces to Auramet with a strike price of $2,000 per ounce, expiring monthly in equal monthly tranches from June 30, 2022 to November 30, 2022. |
Accounting for the Gold loan and the Call options transactions:
| · | At inception the fair value of the Gold loan was calculated at the amount received less the fair value of the Call options. |
| · | As at March 31, 2022 the fair value of the gold loan was calculated by discounting the fair value of the gold deliveries at a forward rate of $1,833 due by a market related discount rate. |
| 19 |
| Caledonia Mining Corporation Plc |
| For the period ended September 30, 2023 and 2022 |
| (in thousands of United States Dollars, unless indicated otherwise) |
| Additional information |
| 12 | Derivative financial instruments (continued) |
| 12.2 | Derivative financial liabilities (continued) |
| (b) | Gold loan and Call options (continued) |
Accounting for the Gold loan and the Call options transactions: (continued)
| · | At inception and at March 31, 2022 the Call options were valued at the quoted prices available from the CME Group Inc. at each respective date. |
| · | Differences in the fair values were accounted for as Fair value losses on derivative financial instruments in the consolidated statement of profit or loss and other comprehensive income. |
| · | The Call options were classified as level 1 in the fair value hierarchy and the Gold loan as level 2. |
| · | Derivative liabilities are not designated as hedging instruments. |
Proceeds received under the Gold loan and Call options agreements were allocated as follows:
| December 13, 2021 | |||
| Net proceeds received | 2,960 | ||
| Fair value of Call options | 208 | ||
| Fair value of Gold loan | 2,752 |
The Gold loan was settled in full on June 30, 2022. The remaining Call options, outstanding as at September 30, 2022, expire on October 31, 2022 and November 30, 2022 and the value is not significant.
| (c) | Cap and collar options and Call options |
On February 17, 2022 the Company entered into a zero cost contract to hedge 20,000 ounces of gold over a period of 5 months from March to July 2022. The hedging contract had a cap of $1,940 and a collar of $1,825 over 4,000 ounces of gold per month expiring at the end of each month over the 5-month period.
On March 9, 2022 in response to a very volatile gold price the Company purchased a matching quantity of Call options at a strike price above the cap at a total cost of $796 over 4,000 ounces of gold per month at strike prices of $2,100 per ounce from March 2022 to May 2022 and $2,200 per ounce from June 2022 to July 2022 in order to limit margin exposure and reinstate gold price upside above the strike price.
In April, 2022 Auramet and the Company each purchased matching quantities of Call options at a net settlement cost to the Company of $176 over 2,400 ounces of gold per month at strike prices of $1,886 and $1,959.50 respectively. These options were purchased to hedge against a short term increase in the gold price for the last week of April 2022. At the 2022 year end both these options expired.
| 13 | Finance income and finance cost |
| 2023 | 2022 | |||||||
| Finance income received - Bank | 30 | 10 | ||||||
| Unwinding of rehabilitation provision (note 22) | 279 | 159 | ||||||
| Finance cost - Leases | 15 | 25 | ||||||
| Finance cost - Overdraft | 1,076 | 126 | ||||||
| Finance cost - Motapa loan note payable (note 23.1) | 619 | – | ||||||
| Finance cost - Solar loan notes payable (note 23.2) | 373 | – | ||||||
| 2,362 | 310 | |||||||
| 20 |
| Caledonia Mining Corporation Plc |
| For the period ended September 30, 2023 and 2022 |
| (in thousands of United States Dollars, unless indicated otherwise) |
| Additional information |
| 14 | Property, plant and equipment |
| Cost | Land and Buildings | Right of use assets | Mine development, infrastructure and other | Assets under construction and decommissioning assets | Plant and equipment | Furniture and fittings | Motor vehicles | Solar Plant& | Total | |||||||||||||||||||||||||||
| Balance at January 1, 2022 | 14,435 | 543 | 73,914 | 35,476 | 64,319 | 1,342 | 3,169 | 1,940 | 195,138 | |||||||||||||||||||||||||||
| Additions* | – | – | – | 31,711 | 3,049 | 243 | 147 | 12,198 | 47,348 | |||||||||||||||||||||||||||
| Impairments@ | – | – | (8,518 | ) | – | (998 | ) | – | – | – | (9,516 | ) | ||||||||||||||||||||||||
| Reallocations between asset classes # | 759 | – | 15,886 | (20,734 | ) | 4,089 | – | – | – | – | ||||||||||||||||||||||||||
| Acquisition of Bilboes oxide assets (Tribute) | – | – | 872 | – | – | – | – | – | 872 | |||||||||||||||||||||||||||
| Foreign exchange movement | – | (18 | ) | – | – | 26 | (22 | ) | (2 | ) | – | (16 | ) | |||||||||||||||||||||||
| Balance at December 31, 2022 | 15,194 | 525 | 82,154 | 46,453 | 70,485 | 1,563 | 3,314 | 14,138 | 233,826 | |||||||||||||||||||||||||||
| Additions* | – | – | 8,563 | 6,907 | 2,140 | 357 | 160 | 34 | 18,161 | |||||||||||||||||||||||||||
| Impairments~ | – | – | (872 | ) | – | (36 | ) | – | – | – | (908 | ) | ||||||||||||||||||||||||
| Reallocations between asset classes | – | – | 5,604 | (7,129 | ) | 1,525 | – | – | – | – | ||||||||||||||||||||||||||
| Reallocate to assets held for sale | – | – | – | – | – | – | – | (14,172 | ) | (14,172 | ) | |||||||||||||||||||||||||
| Foreign exchange movement | – | (29 | ) | – | – | (13 | ) | (44 | ) | (4 | ) | – | (90 | ) | ||||||||||||||||||||||
| Balance at September 30, 2023 | 15,194 | 496 | 95,449 | 46,231 | 74,101 | 1,876 | 3,470 | – | 236,817 |
| * | Included in additions is the change in estimate for the decommissioning asset of ($445) (2022: ($468)). The total cost of the decommissioning asset for Blanket amounted to $1,217 (2022: $1,661) and total accumulated depreciation to $762 (2022: $692). |
| @ | Included in the 2022 impairments are development asset costs of $8,518 that predominantly relates to prospective areas above 750 meters at Blanket which are not included in the LoMP. Also included in the 2022 impairments are generator cost of $791 and loader bottom decks at a cost of $101, these assets were no longer in working condition. The carrying amount for these impaired assets were impaired to $Nil. |
| & | The solar plant was fully commissioned on February 2, 2023 and the sale agreement between Caledonia Mining Corporation Plc and Caledonia Mining Services (Private) Limited was concluded for the sale of the solar plant. Depreciation on the solar plant commenced on February 2, 2023 and the power purchase agreement, between Caledonia Mining Services (Private) Limited and Blanket Mine, became effective. In December 2022, the Caledonia board approved a proposal for Caledonia Mining Services (PvT) Ltd (which owns the solar plant) to issue loan note instruments (“bonds”) up to a value of $12 million. The decision was taken in order to optimise the capital structure of the Group and provide additional debt instruments to the Zimbabwean financial market. Refer to note 23.2 for more information on these loan note instruments. |
| ~ | On June 27, 2023 the decision was taken to place the Bilboes oxide mine on care and maintenance as the cost related to removing the waste and access the orebody could exceed the benefit from the gold revenues to be received. The impairment loss that was recognised amounted to $851 on impairing the Bilboes oxide asset classified under Property, plant and equipment. Mining and metallurgical processing continued at the Bilboes oxide mine until the end of September 2023 when the contract miner's notice period came to an end. Leaching of material that has already been deposited on the leach pad will continue. Oxide mining and processing will resume when the stripping of the waste for the sulphide project commences and can be economically justified. |
| 21 |
| Caledonia Mining Corporation Plc |
| For the period ended September 30, 2023 and 2022 |
| (in thousands of United States Dollars, unless indicated otherwise) |
| Additional information |
| 14 | Property, plant and equipment (continued) |
| Accumulated depreciation and Impairment losses | Land and Buildings | Right of use assets | Mine development, infrastructure and other | Assets under construction and decommissioning assets | Plant and equipment | Furniture and fittings | Motor vehicles | Solar Plant | Total | |||||||||||||||||||||||||||
| Balance at January 1, 2022 | 7,335 | 97 | 8,910 | 600 | 25,505 | 958 | 2,631 | – | 46,036 | |||||||||||||||||||||||||||
| Depreciation for the year | 1,015 | 137 | 3,990 | 93 | 4,527 | 163 | 216 | – | 10,141 | |||||||||||||||||||||||||||
| Accumulated depreciation for impairments | – | – | (532 | ) | – | (775 | ) | – | – | – | (1,307 | ) | ||||||||||||||||||||||||
| Foreign exchange movement | – | (4 | ) | – | – | – | (21 | ) | (2 | ) | – | (27 | ) | |||||||||||||||||||||||
| Balance at December 31, 2022 | 8,350 | 230 | 12,368 | 693 | 29,257 | 1,100 | 2,845 | – | 54,843 | |||||||||||||||||||||||||||
| Depreciation for the period | 753 | 93 | 3,295 | 70 | 4,747 | 130 | 186 | 775 | 10,049 | |||||||||||||||||||||||||||
| Accumulated depreciation for assets reallocated to assets held for sale | – | – | – | – | – | – | – | (775 | ) | (775 | ) | |||||||||||||||||||||||||
| Accumulated depreciation for impairments | – | – | (21 | ) | – | (10 | ) | – | – | – | (31 | ) | ||||||||||||||||||||||||
| Foreign exchange movement | – | (12 | ) | – | – | – | (38 | ) | (3 | ) | – | (53 | ) | |||||||||||||||||||||||
| Balance at September 30, 2023 | 9,103 | 311 | 15,642 | 763 | 33,994 | 1,192 | 3,028 | – | 64,033 | |||||||||||||||||||||||||||
| Carrying amounts | ||||||||||||||||||||||||||||||||||||
| At December 31, 2022 | 6,844 | 295 | 69,786 | 45,760 | 41,228 | 463 | 469 | 14,138 | 178,983 | |||||||||||||||||||||||||||
| At September 30, 2023 | 6,091 | 185 | 79,807 | 45,468 | 40,107 | 684 | 442 | – | 172,784 |
| 22 |
| Caledonia Mining Corporation Plc |
| For the period ended September 30, 2023 and 2022 |
| (in thousands of United States Dollars, unless indicated otherwise) |
| Additional information |
| 14 | Property, plant and equipment (continued) |
| (a) | Change in estimate |
In April 2023 Management performed an operational efficiency review of its mining related equipment, which resulted in changes in the expected useful life of some of the assets included under Mine, development, infrastructure and other and Plant and equipment asset classes.
| (i) | Mine, development, infrastructure and other |
In August 2015 the Blanket Mine announced the construction of a new central shaft going down to 1,200 metres from surface, providing access for horizontal development in two directions on three levels below 750m. The aim was to increase production to annual levels of 75,000 to 80,000 ounces per year and extend the life of mine. The Company commissioned the central shaft in first quarter of 2021.This shaft is used for hosting ore and men. Prior to commissioning of the central shaft, men were hoisted through the existing Jethro shaft which was constructed around 2009. With the commissioning of the central shaft, there will be a gradual decrease in the usage of the Jethro shaft for hoisting until decommissioning. The Jethro shaft is expected to be decommissioned in March 2025. Future economic benefits are expected to flow to the entity until the shaft is decommissioned.
The Company estimate to produce 160 000 ounces until the Jethro shaft is decommissioned. Previously estimated with a ten-year useful life, the shaft is now estimated to have a useful life of two years from April 1, 2023.
| (ii) | Plant and equipment |
In carrying out a comprehensive asset’s useful life assessment, the following factors were considered in determining the useful life of an asset:
| · | expected physical wear and tear, which depends on operational factors such as the number of shifts for which the asset is to be used, the current repair and maintenance programme, and the care and maintenance of the asset while idle; and |
| · | the expected usage of the asset. |
An analysis of the various asset categories for which exceptions were identified during the assessment process are generators, load haul dump machines (“LHD’s”), dump trucks, rock breakers and drill rigs. Previously estimated with a ten-year useful life, these plant and equipment are now estimated to have a useful life of five years from April 1, 2023.
Notwithstanding any future addition to the above-mentioned assets, the effect of the change in useful life on actual and expected depreciation expense, effective for the period ended September 30, 2023, is as follows:
| Increase in depreciation expense from April 1, 2023 to September 30, 2023 | |
| Mine, development, infrastructure and other | 522 |
| Plant and equipment | 868 |
| 1,390 | |
The above results are a change in estimates and applied prospectively from April 1, 2023.
| 23 |
| Caledonia Mining Corporation Plc |
| For the period ended September 30, 2023 and 2022 |
| (in thousands of United States Dollars, unless indicated otherwise) |
| Additional information |
| 15 | Exploration and evaluation assets |
| Bilboes | Motapa | Maligreen | Connemara North | GG | Sabiwa | Abercorn | Valentine | Total | |
| Balance at January 1, 2022 | – | – | 4,196 | 463 | 3,618 | 290 | 16 | 65 | 8,648 |
| Acquisition costs: | |||||||||
| - Mining claims acquired | – | 7,844 | – | – | – | – | – | – | 7,844 |
| Exploration costs: | |||||||||
| - Consumables and drilling | – | – | 1,170 | – | 36 | – | – | – | 1,206 |
| - Contractor | – | – | – | 4 | – | – | – | – | 4 |
| - Labour | – | – | 260 | – | 37 | – | 11 | – | 308 |
| - Power | – | – | – | – | 32 | 4 | – | – | 36 |
| Impairment * | – | – | – | (467) | – | – | – | – | (467) |
| Balance at December 31, 2022 | – | 7,844 | 5,626 | – | 3,723 | 294 | 27 | 65 | 17,579 |
| Acquisition costs: | |||||||||
| - Bilboes Gold | 73,198 | – | – | – | – | – | – | – | 73,198 |
| Decommissioning asset estimation adjustment | – | 1,174 | – | – | – | – | – | – | 1,174 |
| Exploration costs: | |||||||||
| - Consumables and drilling | – | 321 | 101 | – | – | – | – | – | 422 |
| - Labour | – | 214 | 111 | – | – | – | – | – | 325 |
| - Power | – | – | 3 | – | – | – | – | – | 3 |
| - Other | 130 | – | – | – | – | – | – | – | 130 |
| Balance at September 30, 2023 | 73,328 | 9,553 | 5,841 | – | 3,723 | 294 | 27 | 65 | 92,831 |
| * | Caledonia has completed sufficient work to establish that the potential orebody at the Connemara North properties will not meet Caledonia’s requirements in terms of size, grade and width. Accordingly, Caledonia will not exercise the option to acquire the property. |
| Decommissioning asset amounts of $4,466 (2022: $Nil) was accounted for at Bilboes, Motapa $1,174 (2022: $Nil) and $135 (2022: $135) at Maligreen. | |
| 24 |
| Caledonia Mining Corporation Plc |
| For the period ended September 30, 2023 and 2022 |
| (in thousands of United States Dollars, unless indicated otherwise) |
| Additional information |
| 15 | Exploration and evaluation assets (continued) |
| (a) | Bilboes Gold |
Refer to note 5 for more information on the acquisition of the Bilboes Gold sulphide exploration and evaluation project.
| (b) | Motapa |
On November 1, 2022 Caledonia entered into a Share Purchase Agreement with Bulawayo Mining Company Limited (“Bulawayo Mining”) to acquire all the shares of Motapa Mining Company UK Limited (“Motapa”), along with its wholly owned subsidiary Arraskar Investments (Private) Limited (“Arraskar”).
Caledonia considers Motapa to be highly prospective and strategically important to its growth ambitions in Zimbabwe in terms of both location and scale. Motapa is a large exploration property which is contiguous to the Bilboes gold project.
The Motapa asset has been mined throughout most of the second half of the 20th century, Caledonia understands that during this period the region produced as much as 300,000 ounces of gold. Whilst none of the mining infrastructure remains, the evidence of historical mining will provide guidance to our exploration team in best understanding the prospectivity of the region.
The acquisition was accounted for as an asset acquisition as the net assets acquired do not meet the definition of a business. The purchase price of the net assets acquired was allocated to Exploration and evaluation assets based on management’s estimation of the fair value at acquisition.
The initial purchase price of $1 million was paid on November 1, 2022. Stamp duties of $41 were paid on November 9, 2022. There were no liabilities assumed with the acquisition of Motapa and Arraskar. The remainder of the purchase price was to be settled by way of loan notes (refer to note 23.1). The loan notes were paid in full. The final settlement was made on July 3, 2023.
| (c) | Maligreen |
On November 3, 2021 the mining claims had been transferred to Caledonia over the Maligreen project (“Maligreen”), a property situated in the Gweru mining district in the Zimbabwe Midlands, for a total cash consideration of US$4 million.
Maligreen is a substantial brownfield exploration opportunity with significant historical exploration and evaluation work having been conducted on the property over the last 30 years including:
| · | An estimated 60,000 meters of diamond core and percussion drilling |
| · | 3.5 tonnes of bulk metallurgical test work |
| · | Aeromagnetic and ground geophysical surveys |
The total land area of Maligreen is approximately 550 hectares comprising two historic open pit mining operations which produced approximately 20,000 oz of gold mined from oxides between 2000 and 2002 after which the operation was closed.
| 25 |
| Caledonia Mining Corporation Plc |
| For the period ended September 30, 2023 and 2022 |
| (in thousands of United States Dollars, unless indicated otherwise) |
| Additional information |
| 15 | Exploration and evaluation assets (continued) |
| (c) | Maligreen (continued) |
On November 7, 2022 the Company published an announcement and an updated technical report on SEDAR updating the estimated mineral resources at Maligreen. The report has an effective date of September 30, 2022 and estimates measured and indicated mineral resources of 8.03 million tonnes at a grade of 1.71g/t containing approximately 442,000 ounces of gold and inferred mineral resources of 6.17 million tonnes at a grade of 2.12g/t containing approximately 420,000 ounces of gold. The upgrade to the mineral resources at Maligreen improves the geological confidence of approximately half the mineral resources from inferred to measured and indicated mineral resources from the previous mineral resources statement.
Since Caledonia acquired the Maligreen claims in November 2021 it has been focused on reviewing the geological work conducted at the property.
| 16 | Inventories |
| 2023 | December 31, 2022 | |||||||
| Consumable stores* | 17,067 | 17,645 | ||||||
| Gold in progress and Ore stock-pile@ | 1,759 | 689 | ||||||
| 18,826 | 18,334 | |||||||
| * | Included in consumables stores is an amount of ($1,510) (2022: ($1,510)) for provision for obsolete stock. |
| @ | Gold work in progress balance as at September 30, 2023 consists of 2,277 ounces (2022: Nil ounces). |
| 17 | Prepayments |
| 2023 | December 31, 2022 | |||||||
| Suppliers - South Africa | 1,001 | 254 | ||||||
| - Zimbabwe | 3,922 | 1,494 | ||||||
| - Bilboes | – | 802 | ||||||
| Solar prepayments | – | 104 | ||||||
| Bilboes pre-effective date costs | – | 877 | ||||||
| Other prepayments | 170 | 162 | ||||||
| 5,093 | 3,693 | |||||||
| 26 |
| Caledonia Mining Corporation Plc |
| For the period ended September 30, 2023 and 2022 |
| (in thousands of United States Dollars, unless indicated otherwise) |
| Additional information |
| 18 | Trade and other receivables |
| 2023 | December 31, 2022 | |||||||
| Bullion sales receivable | 1,137 | 7,383 | ||||||
| VAT receivables | 3,716 | 1,001 | ||||||
| Solar - VAT and duty receivables | 720 | 720 | ||||||
| Deposits for stores, equipment and other receivables | 176 | 81 | ||||||
| 5,749 | 9,185 | |||||||
The carrying value of trade receivables is considered a reasonable approximation of fair value and are short term in nature. No provision for expected credit losses was recognised in the current or prior period as none of the debtors were past due. Up to the date of approval of these financial statements all of the outstanding bullion sales receivable was settled in full. The Company offset VAT receivables equating to $1.8 million against liabilities due for other types of taxes administrated by the Zimbabwe revenue authority.
| 19 | Cash and cash equivalents |
| 2023 | December 31, 2022 | |||||||
| Bank balances | 10,775 | 4,737 | ||||||
| Restricted cash | – | 1,998 | ||||||
| Cash and cash equivalents | 10,775 | 6,735 | ||||||
| Bank overdrafts and short term loans used for cash management purposes | (13,967 | ) | (5,239 | ) | ||||
| Net cash and cash equivalents | (3,192 | ) | 1,496 | |||||
| Date drawn | Expiry | Repayment term | Principal value | Balance drawn at September 30, 2023 | ||||||||||||
| Overdraft facilities and term loans | ||||||||||||||||
| Stanbic Bank - RTGS$ denomination | January 2023 | February 2024 | On demand | RTGS$350 million | $Nil | |||||||||||
| Stanbic Bank - USD denomination | September 2023 | July 2024 | On demand | $4 million | $3.75 million | |||||||||||
| Ecobank - USD denomination | November 2022 | October 2023 | On demand | $5 million | $4.7 million | |||||||||||
| Ecobank term loan - USD denomination | March 2023 | October 2023 | On demand | $2 million | $Nil | |||||||||||
| Nedbank Zimbabwe - USD denomination | December 2022 | October 2023 | On demand | $3.5 million | $2.09 million | |||||||||||
| Nedbank Zimbabwe term loan - USD denomination | April 2023 | April 2024 | On demand | $3.5 million | $3 million | |||||||||||
| CABS Bank of Zimbabwe - USD denomination | September 2023 | July 2024 | On demand | $2 million | $0.4 million |
| 27 |
| Caledonia Mining Corporation Plc |
| For the period ended September 30, 2023 and 2022 |
| (in thousands of United States Dollars, unless indicated otherwise) |
| Additional information |
| 20 | Assets held for sale |
| 2023 | 2022 | |||||||
| Non-current assets held for sale | ||||||||
| Solar Plant | 13,397 | – |
In the second quarter of 2023 management embarked on a marketing process to locate a buyer for the Blanket mine solar plant. Various offers were received and a counterparty with a non-binding offer was given exclusivity to further negotiate the sale of the plant after proving their ability to operate and fund solar plants of similar size and complexity. The offer was received from a reputable global solar operator and management is in an advanced stage of executing agreements to sell the solar plant. It is proposed that the new owners exclusively supply Blanket mine with electricity from the current plant, on a take-or-pay basis and in doing so secure Blanket’s future power supply. This has the benefit of realising a profit on the sale of the plant and generate cash for reinvestment in our gold projects. In addition, management can focus on Caledonia’s core business of gold mining which yield higher returns to our shareholders.
On September 28, 2023 the Board approved management to negotiate the sale of the solar plant with the potential buyer. The assets were available for sale in their condition on September 28, 2023 and therefore met the criteria to be classified as held for sale.
Management determined the value at the carrying amount of $13,397 at September 28, 2023, as it was the lower of the fair value less cost to sell and the carrying amount. The proceeds of the disposal are expected to substantially exceed the carrying amount of the related net assets and accordingly no impairment losses have been recognised on the classification of the solar plant. The asset was classified as Property, plant and equipment before the reclassification to Assets held for sale.
| 21 | Share capital |
Authorised
Unlimited number of ordinary shares of no par value.
Unlimited number of preference shares of no par value.
Issued ordinary shares
| Number of fully paid shares | Amount | |||||||
| January 1, 2022 | 12,756,606 | 82,667 | ||||||
| Shares issued: | ||||||||
| - share-based payment - employees (note 10.1(a)) | 76,520 | 804 | ||||||
| December 31, 2022 | 12,833,126 | 83,471 | ||||||
| Shares issued: | ||||||||
| - share-based payment - employees (note 10.1(a)) | 24,389 | 351 | ||||||
| - equity raise* | 1,207,514 | 15,658 | ||||||
| - Bilboes Gold Limited acquisition (note 5) | 5,123,044 | 65,677 | ||||||
| September 30, 2023 | 19,188,073 | 165,157 | ||||||
| * | Gross proceeds of $10,770 with a transaction cost of $757 were raised by issuing depository interests on the AIM of the London Stock Exchange.
Mark Learmonth, Chief Executive Officer, and Toziyana Resources Limited, a company affiliated with Victor Gapare, executive Director of the Company, have conditionally subscribed for 3,587 Placing Shares and 11,000 Placing Shares respectively on the AIM of the London Stock Exchange, both at the Placing Price.
Gross proceeds of $5,850 with a transaction cost of $205 were raised by issuing depository receipts on the VFEX. |
| 28 |
| Caledonia Mining Corporation Plc |
| For the period ended September 30, 2023 and 2022 |
| (in thousands of United States Dollars, unless indicated otherwise) |
| Additional information |
| 22 | Provisions |
Site restoration
Site restoration relates to the estimated cost of closing down the mines and represents the site and environmental restoration costs, estimated to be paid throughout the period up until closure due to areas of environmental disturbance present at the reporting date as a result of mining activities. For properties in the production phase on original recognition site restoration costs are capitalsed in Property, plant and equipment with an increase in the provision at the net present value of the estimated cost of site rehabilitation. Subsequently the costs capitalised are amortised over the life of the mine and the provision is unwound over the period to estimated restoration. For properties in the Exploration and evaluation phase on original recognition site restoration costs are capitalised in Exploration and evaluation assets with an increase in the provision at the undiscounted value of the estimated cost of site rehabilitation. Subsequently the costs capitalised are not amortised and the provision is not unwound.
| Reconciliation of site restoration provision | 2023 | December 31, 2022 | ||||||
| Balance January 1 | 2,958 | 3,294 | ||||||
| Unwinding of discount | 279 | 132 | ||||||
| Change in estimate producing mine (Blanket) - adjustment capitalised in Property, plant and equipment (note 14) | (445 | ) | (468 | ) | ||||
| Change in estimate (Motapa) - adjustment capitalised in Exploration and evaluation assets (note 15) | 1,174 | – | ||||||
| Acquisition (Bilboes) - capitalised in Exploration and evaluation assets (note 5) | 4,466 | – | ||||||
| Balance September 30 | 8,432 | 2,958 | ||||||
| Current | – | – | ||||||
| Non-current | 8,432 | 2,958 | ||||||
The discount rates currently applied in calculating the present value of the Blanket Mine provision is 4.92% (2022: 4.14%), based on a risk-free rate and cash flows estimated at an average 3.10% inflation (2022: 2.40%). The gross rehabilitation costs, before discounting, amounted to $3,137 (2022: $3,137) for Blanket Mine as at September 30, 2023. The gross rehabilitation costs, before discounting, amounted to $4,466 for Bilboes as at September 30, 2023.
| (a) | Change in estimate |
Amounts recorded for restoration and rehabilitation provision require management to estimate the future costs the Company will incur to complete the reclamation and remediation work required to comply with applicable laws and regulations as well as the timing of the reclamation activities and estimated discount rate. Future changes to environmental laws and regulations could increase the extent of reclamation and remediation work required to be performed by the Company. Increases in future costs could materially impact the amounts charged to operations for reclamation and remediation. The provision represents management’s best estimate of the present value of the future reclamation and remediation costs.
| 29 |
| Caledonia Mining Corporation Plc |
| For the period ended September 30, 2023 and 2022 |
| (in thousands of United States Dollars, unless indicated otherwise) |
| Additional information |
| 22 | Provisions (continued) |
| (a) | Change in estimate (continued) |
| (i) | Motapa |
Management of Caledonia has recently completed the process of obtaining the rehabilitation liability cost estmate. This new information relating to the rehabilitation liability was not available when the 2022 audited consolidated financial statements were authorised for issue on March 24, 2023.
Site restoration at Motapa is capitalised to the exploration and evaluation assets.The effect of the change in estimation on expected future costs, effective for the period ended September 30, 2023, is as follows:
| Increase in provision as at September 30, 2023 | |
| Exploration and evaluation asset | 1,174 |
| 23 | Loan note instruments |
| Loan note instruments - finance costs | 2023 | 2022 | ||||||||||
| Motapa loan notes | 23.1 | 619 | – | |||||||||
| Solar loan notes | 23.2 | 373 | – | |||||||||
| 992 | – | |||||||||||
| Loan note instruments - Financial liabilities | 2023 | December 31, 2022 | ||||||||||
| Motapa loan notes | 23.1 | – | 7,104 | |||||||||
| Solar loan notes | 23.2 | 7,055 | – | |||||||||
| 7,055 | 7,104 | |||||||||||
| Current | 665 | 7,104 | ||||||||||
| Non-current | 6,390 | – | ||||||||||
| 23.1 | Motapa loan note instruments payable |
On November 1, 2022 Caledonia, in connection with the Share Purchase Agreement, entered into a Loan note Instrument agreement (“Loan note” or “Notes”) with Bulawayo Mining to acquire all the shares of Motapa Mining Company UK Limited (“Motapa”), along with its wholly owned subsidiary Arraskar Investments (Private) Limited (“Arraskar”). The purchased shares are with full title guarantee and free from all Encumbrances, together with all rights attached or accruing to them. The Loan note certificates were also issued by Caledonia on November 1, 2022.
The aggregate principal amount of the Loan notes were limited to US$7.25 million. Interest on the Loan notes is compounded monthly an interest rate of 13% per annum. Interest shall be payable on the principal amount of the Loan notes outstanding from time to time from the issue date of the Loan notes until the date of redemption of the Loan notes at the interest rate. $5 million of the loan notes was paid on March 31, 2023, $2.25 million on June 30, 2023. $575 of the loan notes were paid on July 3, 2023 as agreed between Caledonia and each of the noteholders due to bank holidays in certain jurisdictions.
| 30 |
| Caledonia Mining Corporation Plc |
| For the period ended September 30, 2023 and 2022 |
| (in thousands of United States Dollars, unless indicated otherwise) |
| Additional information |
| 23 | Loan note instruments (continued) |
| 23.1 | Motapa loan note instruments payable (continued) |
All notes paid by Caledonia are immediately cancelled and are not reissued.
Caledonia retained at least $1 million as the penalty sum, in a bank account held in its name in Jersey for so long as any amounts remained outstanding on the notes. All notes were paid in full on July 3, 2023.
The fair value of the Loan note payable at inception was estimated to be $6,802 using the market approach method. The effective interest rate on the Loan note was estimated to be 12.75% per annum. The loan notes were subsequently measured at amortised cost.
A summary of the Loan notes payable were as follows:
| 2023 | December 31, 2022 | |||||||
| Balance January 1 | ||||||||
| Fair value November 1, 2022 | 7,104 | 6,802 | ||||||
| Finance cost | 619 | 302 | ||||||
| Repayment | (7,723 | ) | - | |||||
| Balance September 30 | - | 7,104 | ||||||
| Current | - | 7,104 | ||||||
| Non-current | - | – | ||||||
| 23.2 | Solar loan note instruments |
Following the commissioning of Caledonia’s wholly owned solar plant on February 2, 2023, the decision was taken to optimise the capital structure of the Group and provide additional debt instruments to the Zimbabwean financial market by way of issuing loan note instruments (“bonds”). The bonds were issued by the Zimbabwean registered entity owning the solar plant, Caledonia Mining Services (PvT) Limited. The bonds carry an interest rate of 9.5% payable bi-annually and have a tenor of 3 years from the date of issue. The bond repayments are guaranteed by the Company. $7 million of bonds were in issue at the date of approval of these financial statements. All bonds were issued to Zimbabwean registered commercial entities.
A summary of the bonds are as follows:
| 2023 | December 31, 2022 | |||||||
| Balance January 1 | – | – | ||||||
| Amounts received | 7,000 | – | ||||||
| Transaction costs | (105 | ) | – | |||||
| Finance cost | 373 | – | ||||||
| Repayment | (213 | ) | – | |||||
| Balance September 30 | 7,055 | – | ||||||
| Current | 665 | – | ||||||
| Non-current | 6,390 | – |
| 31 |
| Caledonia Mining Corporation Plc |
| For the period ended September 30, 2023 and 2022 |
| (in thousands of United States Dollars, unless indicated otherwise) |
| Additional information |
| 24 | Trade and other payables |
| 2023 | December 31, 2022 | |||||||
| Trade payables | 3,967 | 3,502 | ||||||
| Electricity accrual | 1,245 | 2,386 | ||||||
| Audit fee | 212 | 284 | ||||||
| Dividends due | 3,858 | 1,883 | ||||||
| Voltalia accrual | – | 1,852 | ||||||
| Bilboes oxide project payable | – | 872 | ||||||
| Other payables | 1,546 | 651 | ||||||
| Financial liabilities | 10,828 | 11,430 | ||||||
| Production and management bonus accrual - Blanket Mine | 908 | 287 | ||||||
| Other employee benefits | 1,360 | 982 | ||||||
| Leave pay | 2,940 | 2,462 | ||||||
| Bonus provision (excluding Blanket and Bilboes) | – | 1,025 | ||||||
| Accruals | 1,423 | 1,268 | ||||||
| Non-financial liabilities | 6,631 | 6,024 | ||||||
| Total | 17,459 | 17,454 | ||||||
| 25 | Cash flow information |
Non-cash items and information presented separately on the Statements of cash flows statement:
| 2023 | 2022 | |||||||
| Operating profit | 12,577 | 45,544 | ||||||
| Adjustments for: | ||||||||
| Impairment of property, plant and equipment | 878 | 197 | ||||||
| Impairment of exploration and evaluation assets (note 15) | – | 467 | ||||||
| Unrealised foreign exchange gains (note 11) | (2,477 | ) | (12,728 | ) | ||||
| Cash-settled share-based expense (note 10.1) | 298 | 335 | ||||||
| Cash-settled share-based expense included in production costs (note 10.1) | 435 | 441 | ||||||
| Cash portion of cash-settled share-based expense | (1,695 | ) | (1,468 | ) | ||||
| Equity-settled share-based expense (note 10.2) | 564 | 176 | ||||||
| Depreciation (note 14) | 10,049 | 7,372 | ||||||
| Fair value loss on derivative instruments | 590 | 364 | ||||||
| Cash generated from operations before working capital changes | 21,219 | 40,700 | ||||||
| Inventories | 516 | 1,071 | ||||||
| Prepayments | 3,253 | 1,453 | ||||||
| Trade and other receivables | (3,537 | ) | (1,534 | ) | ||||
| Trade and other payables | (3,822 | ) | 211 | |||||
| Cash generated from operations | 17,629 | 41,901 | ||||||
| 32 |
| Caledonia Mining Corporation Plc |
| For the period ended September 30, 2023 and 2022 |
| (in thousands of United States Dollars, unless indicated otherwise) |
| Additional information |
| 26 | Operating Segments |
The Group's operating segments have been identified based on geographic areas. The strategic business units are managed separately because they require different technology and marketing strategies. For each of the strategic business units, the Group’s CEO reviews internal management reports on at least a quarterly basis. Blanket mine, Bilboes oxide mine, Exploration and evaluation assets (“E&E projects”) and South Africa describe the Group's reportable segments. The Blanket operating segment comprise Caledonia Holdings Zimbabwe (Private) Limited, Blanket Mine (1983) (Private) Limited, Blanket’s satellite projects and Caledonia Mining Services (Private) Limited (“CMS solar”). The Bilboes oxide mine segment comprise the oxide mining activities. The E&E projects segment, the exploration and evaluation activities of the Bilboes sulphide resources as well as the Motapa and Maligreen projects. The South African segment represents the sales made by Caledonia Mining South Africa Proprietary Limited to the Blanket Mine. The holding company (Caledonia Mining Corporation Plc) and Greenstone Management Services Holdings Limited (a UK company) responsible for corporate administrative functions within the Group are taken into consideration in the strategic decision making process of the CEO and are therefore included in the disclosure below and combined with reconciling amounts that do not represent a separate segment. Information regarding the results of each reportable segment is included below. Performance is measured based on segment profit before income tax or exploration and evaluation costs, as included in the internal management report that are reviewed by the Group's CEO. Segment profit or exploration and evaluation cost is used to measure performance as management believes that such information is the most relevant in evaluating the results of certain segments relative to other entities that operate within these industries.
| 33 |
| Caledonia Mining Corporation Plc |
| For the period ended September 30, 2023 and 2022 |
| (in thousands of United States Dollars, unless indicated otherwise) |
| Additional information |
| 26 | Operating Segments (continued) |
Information about reportable segments
| For the nine months ended September 30, 2023 | Blanket | South Africa | Bilboes oxides | E&E projects | Inter-group eliminations adjustments | Corporate and other reconciling amounts | Total | |||||||||||||||||||||
| Revenue | 103,151 | – | 4,502 | – | – | – | 107,653 | |||||||||||||||||||||
| Inter-segmental revenue | – | 11,072 | – | – | (11,072 | ) | – | – | ||||||||||||||||||||
| Royalty | (5,424 | ) | – | (226 | ) | – | – | – | (5,650 | ) | ||||||||||||||||||
| Production costs | (49,696 | ) | (10,668 | ) | (10,825 | ) | – | 10,161 | – | (61,028 | ) | |||||||||||||||||
| Depreciation | (10,642 | ) | (105 | ) | (21 | ) | – | 750 | (31 | ) | (10,049 | ) | ||||||||||||||||
| Other income | 94 | 22 | – | – | – | 11 | 127 | |||||||||||||||||||||
| Other expenses | (1,935 | ) | – | (865 | ) | – | – | – | (2,800 | ) | ||||||||||||||||||
| Administrative expenses | (124 | ) | (2,444 | ) | (2,068 | ) | – | 7 | (7,261 | ) | (11,890 | ) | ||||||||||||||||
| Management fee | (2,479 | ) | 2,479 | – | – | – | – | – | ||||||||||||||||||||
| Cash-settled share-based expense | – | – | – | – | 434 | (732 | ) | (298 | ) | |||||||||||||||||||
| Equity-settled share-based expense | – | – | – | – | – | (564 | ) | (564 | ) | |||||||||||||||||||
| Net foreign exchange (loss) gain | (3,069 | ) | (154 | ) | (89 | ) | – | (35 | ) | 1,013 | (2,334 | ) | ||||||||||||||||
| Net derivative financial instrument expense | – | – | – | – | – | (590 | ) | (590 | ) | |||||||||||||||||||
| Finance income | – | 30 | – | – | – | – | 30 | |||||||||||||||||||||
| Finance cost | (2,561 | ) | 326 | (1 | ) | – | 2 | (128 | ) | (2,362 | ) | |||||||||||||||||
| Profit (loss) before tax | 27,315 | 558 | (9,593 | ) | – | 247 | (8,282 | ) | 10,245 | |||||||||||||||||||
| Tax expense | (7,869 | ) | (251 | ) | (89 | ) | – | (43 | ) | (300 | ) | (8,552 | ) | |||||||||||||||
| Profit (loss) after tax | 19,446 | 307 | (9,682 | ) | – | 204 | (8,582 | ) | 1,693 | |||||||||||||||||||
| As at September 30, 2023 | Blanket | South Africa | Bilboes oxides | E&E projects | Inter-group eliminations adjustments | Corporate and other reconciling amounts | Total | |||||||||||||||||||||
| Geographic segment assets: | ||||||||||||||||||||||||||||
| Current (excluding intercompany, including Assets held for sale) | 48,300 | 2,999 | – | 463 | (1,709 | ) | 4,471 | 54,524 | ||||||||||||||||||||
| Non-Current (excluding intercompany) | 182,522 | 926 | – | 88,722 | (5,276 | ) | (1,081 | ) | 265,813 | |||||||||||||||||||
| Assets held for sale (note 20) | 13,397 | – | – | – | – | – | 13,397 | |||||||||||||||||||||
| Expenditure on property, plant and equipment (note 14) | 30,701 | 248 | 872 | – | (2,222 | ) | (11,438 | ) | 18,161 | |||||||||||||||||||
| Expenditure on evaluation and exploration assets (note 15) | – | – | – | 75,252 | – | – | 75,252 | |||||||||||||||||||||
| Intercompany balances | 43,146 | 15,323 | (114 | ) | – | (142,366 | ) | 84,011 | – |
| 34 |
| Caledonia Mining Corporation Plc |
| For the period ended September 30, 2023 and 2022 |
| (in thousands of United States Dollars, unless indicated otherwise) |
| Additional information |
| 26 | Operating Segments (continued) |
| As at September 30, 2023 | Blanket | South Africa | Bilboes oxides | E&E projects | Inter-group eliminations adjustments | Corporate and other reconciling amounts | Total | |||||||||||||||||||||
| Geographic segment liabilities: | ||||||||||||||||||||||||||||
| Current (excluding intercompany) | (29,723 | ) | (2,130 | ) | – | 365 | – | (4,278 | ) | (35,766 | ) | |||||||||||||||||
| Non-current (excluding intercompany) | (12,153 | ) | (17 | ) | – | (5,755 | ) | (7 | ) | (279 | ) | (18,211 | ) | |||||||||||||||
| Intercompany balances | (23,859 | ) | (34,402 | ) | – | (6,884 | ) | 142,366 | (77,221 | ) | – |
| For the nine months ended September 30, 2022 | Blanket | South Africa | E&E projects | Inter-group eliminations adjustments | Corporate and other reconciling amounts | Total | ||||||||||||||||||
| Revenue | 107,904 | – | – | – | – | 107,904 | ||||||||||||||||||
| Inter-segmental revenue | – | 13,606 | – | (13,606 | ) | – | – | |||||||||||||||||
| Royalty | (5,408 | ) | – | – | – | – | (5,408 | ) | ||||||||||||||||
| Production costs | (44,165 | ) | (12,871 | ) | – | 12,373 | – | (44,663 | ) | |||||||||||||||
| Depreciation | (7,859 | ) | (113 | ) | – | 632 | (32 | ) | (7,372 | ) | ||||||||||||||
| Other income | 15 | 2 | – | – | – | 17 | ||||||||||||||||||
| Other expenses | (1,368 | ) | – | – | – | (467 | ) | (1,835 | ) | |||||||||||||||
| Administrative expenses | (116 | ) | (2,056 | ) | – | (86 | ) | (5,810 | ) | (8,068 | ) | |||||||||||||
| Management fee | (2,623 | ) | 2,623 | – | – | – | – | |||||||||||||||||
| Cash-settled share-based expense | – | – | – | 441 | (776 | ) | (335 | ) | ||||||||||||||||
| Equity-settled share-based expense | – | – | – | – | (176 | ) | (176 | ) | ||||||||||||||||
| Net foreign exchange gain (loss) | 6,448 | (523 | ) | – | 24 | 691 | 6,640 | |||||||||||||||||
| Net derivative financial instrument expense | – | – | – | – | (1,160 | ) | (1,160 | ) | ||||||||||||||||
| Finance income | – | 10 | – | – | – | 10 | ||||||||||||||||||
| Finance cost | (689 | ) | (20 | ) | – | – | 399 | (310 | ) | |||||||||||||||
| Profit (loss) before tax | 52,139 | 658 | – | (222 | ) | (7,331 | ) | 45,244 | ||||||||||||||||
| Tax expense | (13,362 | ) | (169 | ) | – | 30 | (550 | ) | (14,051 | ) | ||||||||||||||
| Profit (loss) after tax | 38,777 | 489 | – | (192 | ) | (7,881 | ) | 31,193 |
| 35 |
| Caledonia Mining Corporation Plc |
| For the period ended September 30, 2023 and 2022 |
| (in thousands of United States Dollars, unless indicated otherwise) |
| Additional information |
| 26 | Operating Segments (continued) |
| As at September 30, 2022 | Zimbabwe | South Africa | E&E projects | Inter-group eliminations adjustments | Corporate and other reconciling amounts | Total | ||||||||||||||||||
| Geographic segment assets: | ||||||||||||||||||||||||
| Current (excluding intercompany) | 32,959 | 2,936 | – | (63 | ) | 4,837 | 40,669 | |||||||||||||||||
| Non-Current (excluding intercompany) | 174,911 | 1,640 | 5,106 | (5,139 | ) | 11,462 | 187,980 | |||||||||||||||||
| Expenditure on property, plant and equipment (note 14) | 27,401 | 36 | – | (891 | ) | 10,709 | 37,255 | |||||||||||||||||
| Expenditure on evaluation and exploration assets (note 15) | 33 | – | 910 | – | 4 | 947 | ||||||||||||||||||
| Intercompany balances | 35,501 | 11,027 | – | (102,839 | ) | 56,311 | – | |||||||||||||||||
| Geographic segment liabilities: | ||||||||||||||||||||||||
| Current (excluding intercompany) | (12,117 | ) | (1,768 | ) | – | – | (3,365 | ) | (17,250 | ) | ||||||||||||||
| Non-current (excluding intercompany) | (5,944 | ) | (111 | ) | – | 117 | (787 | ) | (6,725 | ) | ||||||||||||||
| Intercompany balances | (12,385 | ) | (34,901 | ) | – | 102,839 | (55,553 | ) | – |
Major customer
Revenues from Fidelity amounted to $59,510 (2022: $107,904) for the nine months ended September 30, 2023.
The Group has made $48,143 (2022: $Nil) of sales to Al Etihad Gold Refinery DMCC (“AEG” an accredited Dubai Good Delivery refinery) up to September 30, 2023, representing 30,193 ounces (2022: Nil ounces) and has received payment in full post quarter end. Management believes this new sales mechanism reduces the risk associated with selling and receiving payment from a single refining source in Zimbabwe. It also creates the opportunity to use more competitive offshore refiners and it may allow for the Company to raise debt funding secured against offshore gold sales.
| 27 | Subsequent events |
There were no significant subsequent events between September 30, 2023 and the date of issue of these financial statements other than included in the preceding notes to the condensed consolidated interim financial statements.
| 36 |
| Caledonia Mining Corporation Plc |
| For the period ended September 30, 2023 and 2022 |
| (in thousands of United States Dollars, unless indicated otherwise) |
| Additional information |
DIRECTORS AND OFFICERS at November 14, 2023
| BOARD OF DIRECTORS | OFFICERS |
| J. L. Kelly (2) (3) (4) (6) (7) (8) | M. Learmonth (5) (6) (7) (8) |
| Non-executive Director | Chief Executive Officer |
| Connecticut, United States of America | Jersey, Channel Islands |
| S. R. Curtis (5) (6) (8) | D. Roets (5) (6) (7) (8) |
| Non-executive Director | Chief Operating Officer |
| Johannesburg, South Africa | Johannesburg, South Africa |
| J. Holtzhausen (1) (2) (4) (5) (6) (7) | C.O. Goodburn (6) (7) |
| Chairman Audit Committee | Chief Financial Officer |
| Non-executive Director | Johannesburg, South Africa |
| Cape Town, South Africa | |
| A. Chester (7) (8) | |
|
M. Learmonth (5) (6) (7) (8) Chief Executive Officer |
General Counsel, Company Secretary and Head of Risk and Compliance |
| Jersey, Channel Islands | Jersey, Channel Islands |
| N. Clarke (3) (4) (5) (6) (7) (8) | BOARD COMMITTEES |
|
Non-executive Director East Molesey, United Kingdom |
(1) Audit Committee |
| (2) Compensation Committee | |
| (3) Corporate Governance Committee | |
| G. Wildschutt (1) (3) (4) (6) (8) | (4) Nomination Committee |
| Non-executive Director | (5) Technical Committee |
| Johannesburg, South Africa | (6) Strategic Planning Committee |
| (7) Disclosure Committee | |
| D. Roets (5) (6) (7) (8) | (8) ESG Committee |
| Chief Operating Officer | |
| Johannesburg, South Africa | |
| G. Wylie (1) (2) (4) (5) (6) | |
| Non-executive Director | |
| Malta, Europe | |
| V. Gapare (5) (6) (8) | |
| Executive Director | |
| Harare, Zimbabwe |
| 37 |
| Caledonia Mining Corporation Plc |
| For the period ended September 30, 2023 and 2022 |
| (in thousands of United States Dollars, unless indicated otherwise) |
| Additional information |
CORPORATE DIRECTORY as at November 14, 2023
| CORPORATE OFFICES | SOLICITORS |
| Jersey | Mourant Ozannes (Jersey) |
| Head and Registered Office | 22 Grenville Street |
| Caledonia Mining Corporation Plc | St Helier |
| B006 Millais House | Jersey |
| Castle Quay | Channel Islands |
| St Helier | |
| Jersey JE2 3NF | Borden Ladner Gervais LLP (Canada) |
| Suite 4100, Scotia Plaza | |
| South Africa | 40 King Street West |
| Caledonia Mining South Africa Proprietary Limited | Toronto, Ontario M5H 3Y4 |
|
No. 1 Quadrum Office Park |
Canada |
|
Constantia Boulevard |
|
| Floracliffe | Memery Crystal LLP (United Kingdom) |
| South Africa | 165 Fleet Street |
| London EC4A 2DY | |
| Zimbabwe | United Kingdom |
| Caledonia Holdings Zimbabwe (Private) Limited | |
| P.O. Box CY1277 | Dorsey & Whitney LLP (US) |
| Causeway, Harare | TD Canada Trust Tower |
| Zimbabwe | Brookfield Place |
| 161 Bay Street | |
| Capitalisation (November 14, 2023) | Suite 4310 |
| Authorised: Unlimited | Toronto, Ontario |
| Shares, Warrants and Options Issued: | M5J 2S1 |
| Shares: 19,188,073 | Canada |
| Options: 20,000 | |
| Gill, Godlonton and Gerrans (Zimbabwe) | |
| SHARE TRADING SYMBOLS | Beverley Court |
| NYSE American - Symbol “CMCL” | 100 Nelson Mandela Avenue |
| AIM - Symbol “CMCL” | Harare, Zimbabwe |
| VFEX - Symbol “CMCL” | |
| Bowman Gilfillan Inc (South Africa) | |
| BANKER | 11 Alice Lane |
| Barclays | Sandton |
| Level 11 | Johannesburg |
| 1 Churchill Place | 2196 |
| Canary Wharf | |
| London E14 5HP | AUDITOR |
| BDO South Africa Incorporated | |
| NOMINATED ADVISOR | Wanderers Office Park |
| Cenkos Securities Plc | 52 Corlett Drive |
| 6.7.8 Tokenhouse Yard | Illovo 2196 |
| London | South Africa |
| EC2R 7AS | Tel: +27(0)10 590 7200 |
| MEDIA AND INVESTOR RELATIONS | REGISTRAR AND TRANSFER AGENT |
| BlytheRay Communications | Computershare |
| 4-5 Castle Court | 150 Royall Street, |
| London EC3V 9DL | Canton, |
| Tel: +44 20 7138 3204 | Massachusetts, 02021 |
|
Tel: +1 800 736 3001 or +1 781 575 3100
|
38
Exhibit 99.2
| CALEDONIA MINING CORPORATION PLC | November 14, 2023 |
Management’s Discussion and Analysis
This management’s discussion and analysis (“MD&A”) of the consolidated operating results and financial position of Caledonia Mining Corporation Plc (“Caledonia” or the “Company”) is for the quarter ended September 30, 2023 (“Q3 2023” or the “Quarter”). It should be read in conjunction with the Unaudited Condensed Consolidated Interim Financial Statements of Caledonia for the Quarter (the “Interim Financial Statements”) which are available from the System for Electronic Data Analysis and Retrieval at www.sedar.com or from Caledonia’s website at www.caledoniamining.com. The Interim Financial Statements and related notes have been prepared in accordance with International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board. In this MD&A, the terms “Caledonia”, the “Company”, the “Group”, “we”, “our” and “us” refer to the consolidated operations of Caledonia Mining Corporation Plc and its subsidiaries unless otherwise specifically noted or the context requires otherwise.
Note that all currency references in this document are in US Dollars (also “$”, “US$” or “USD”), unless stated otherwise.
| 1 |
Table of Contents
| 2 |
| 1. | OVERVIEW |
Caledonia is a Zimbabwean focussed exploration, development, and mining corporation. Caledonia owns a 64% stake in the gold-producing Blanket mine (“Blanket”), and 100% stakes in the Bilboes oxide mine, the Bilboes sulphide project, the Motapa and Maligreen gold mining claims, all situated in Zimbabwe. Caledonia’s shares are listed on the NYSE American LLC (“NYSE American”), depositary interests in Caledonia’s shares are admitted to trading on AIM of the London Stock Exchange plc and depositary receipts in Caledonia’s shares are listed on the Victoria Falls Stock Exchange (“VFEX”) (all under the symbols “CMCL”).
| 2. | SUMMARY |
| 3 months ended September 30 | 9 months ended September 30 | Comment | |||
| 2023 | 2022 | 2023 | 2022 | ||
| Gold produced (oz) | 22,923 | 21,120 | 57,576 | 59,726 |
Gold produced in the Quarter was 8.5% higher than the third quarter of 2022 (the “comparative” or “comparable quarter” or “Q3 2022”) mainly due to higher tonnes milled at Blanket.
21,772 ounces of gold was produced at Blanket marking a record for any quarter and an increase from the 17,436 ounces produced in the previous quarter.
1,151 ounces of gold were produced from the Bilboes oxide mine in the Quarter, an increase from the 1,076 ounces produced in the second quarter of 2023.
The Bilboes oxide mine was intended to be a small-scale, low-margin, short-term project. Mining and hauling activities were placed on care and maintenance at the end of September 2023. |
| On-mine cost per ounce ($/oz)1 | 928 | 734 | 1,056 | 709 |
On-mine cost per ounce in the Quarter increased by 26.5%.
64% of the increase was due to the high cost per ounce at the Bilboes oxide mine that has been placed on care and maintenance.
The remainder of the increase was due to higher on-mine costs at Blanket due to increased labour cost and electricity cost that contributed approximately $91 per ounce to the overall increase in on-mine costs per ounce compared to the comparative quarter. |
| 3 |
| 3 months ended September 30 | 9 months ended September 30 | Comment | |||
| 2023 | 2022 | 2023 | 2022 | ||
| All-in sustaining cost (“AISC”)1 | 1,268 | 962 | 1,339 | 933 | The AISC per ounce in the Quarter increased by 31.8% compared to the comparative quarter predominantly due to the higher on-mine cost per ounce and an increase in sustaining capital expenditure. AISC includes the benefit of the solar plant electricity saving ($38 per ounce) in the Quarter. |
| Average realised gold price ($/oz)1 | 1,901 | 1,696 | 1,906 | 1,792 | The average realised gold price reflects international spot prices. |
| Gross profit2 ($’000) | 14,143 | 15,572 | 30,926 | 50,461 | Gross profit for the Quarter decreased from the comparable quarter due to higher production costs, in particular at the Bilboes oxide mine and increased depreciation. |
| Net profit (loss) attributable to shareholders ($’000) | 4,506 | 8,614 | (1,036) | 25,932 | Net profit for the Quarter includes a lower gross profit due to increased production cost and a foreign exchange loss of $0.3m compared to a foreign exchange gain of $1.6m in the comparable quarter. |
| Basic IFRS profit (loss) earnings per share (“EPS”) (cents) | 24.1 | 65.4 | (6.8) | 197.7 | IFRS EPS reflects the movement in IFRS profit attributable to shareholders and the effect of new shares issued in previous quarters. |
| Adjusted EPS (cents)1 | 33.0 | 60.7 | 15.2 | 178.8 | Adjusted EPS excludes inter alia net foreign exchange gains and losses, deferred tax and fair value movements on derivative financial instruments. |
| Net cash from operating activities ($’000) | 14,495 | 8,923 | 11,393 | 35,792 | Despite the lower operating profit, net cash from operating activities in the Quarter increased due to a reversal of unrealised foreign exchange movements, the reversal of higher depreciation which is included in operating profit and reduced working capital. |
| Net cash and cash equivalents ($’000) | (3,192) | 6,167 | (3,192) | 6,167 | Net cash during the Quarter decreased due to the cash consumption from operating activities from the Bilboes oxide mine and the high level of capital investment at Blanket. |
1 Non-IFRS measures such as “On-mine cost per ounce”, “AISC”, “average realised gold price” and “adjusted EPS” are used throughout this document. Refer to section 10 of this MD&A for a discussion of non-IFRS measures.
2 Gross profit is after deducting royalties, production costs and depreciation but before administrative expenses, other income, interest and finance charges and taxation.
| 4 |
Record quarterly production at Blanket
Gold production at Blanket was a record for any quarter and amounted to 21,772 ounces, 3.1% higher than the 21,120 ounces produced in the comparative quarter. Management has focused intensively on the production challenges in the first half of 2023 and will maintain annual production guidance for Blanket for the year to December 31, 2023 at between 75,000 and 80,000 ounces.
On-mine cost guidance for 2023 at Blanket has increased to between $860 and $950 per ounce from the previous $770 to $850 per ounce due to higher labour and electricity cost. Management is pursuing initiatives to improve operating efficiencies.
Bilboes Feasibility Study
Work to refresh the existing feasibility study for the large-scale sulphide project at Bilboes is well-advanced. Management has always stressed that it will consider alternative development paths for Bilboes with a view to optimising capital allocation and thereby maximising the uplift in value for Caledonia shareholders. The development of a feasibility study for an alternative, smaller scale initial project requires a completely new approach to the mining and processing which will take longer to prepare than the work to refresh the existing large-scale study. The preliminary results of this second exercise are expected in early 2024 after which an indeterminate period will be required to review and, if necessary, optimise the preliminary output. Management awaits the results of both studies (i.e. large scale and small scale) so that it can identify the most effective development route from the perspective of optimal capital allocation.
Bilboes oxide mine on care and maintenance
The Bilboes oxide mine was intended as a small-scale, low-margin, short-term project the primary objective of which was to cover the cost of the Bilboes operation before the start of the larger sulphide project. Due to the oxide mining activities incurring losses, it returned to care and maintenance with effect from September 30, 2023 following which costs at Bilboes will reduce from approximately $1 million per month to $200,000, being the costs of security and other care and maintenance costs.
Oxide mining and processing will resume when the stripping of the waste for the sulphide project commences. Operational costs should come down from approximately $1 million per month after being placed on care and maintenance. Holding costs of security, labour and other care and maintenance costs are expected to amount to $200,000 per month in 2024.
The Company withdrew guidance in April 2023 for the Bilboes oxide mine.
Proposed solar sale
Due to the unique operating environment in Zimbabwe and Caledonia’s significant in-country expertise, Caledonia opted to build the solar plant using its own resources rather than relying on an external party to build and own the solar plant using its own financial resources and selling the resultant power to Blanket on a long-term contract. Accordingly, Caledonia constructed the solar plant at a cost of $14.2 million. As the solar plant is now fully commissioned and is working as planned, Caledonia no longer needs to own the solar plant, provided it retains long term access to the power it produces.
In the second quarter of 2023 management embarked on a process to sell the solar plant. Various offers were received and a counterparty has been given exclusivity to further negotiate the sale of the plant after proving their ability to operate and fund solar plants of similar size and complexity. Management is in an advanced stage of finalising the contractual arrangements to sell the solar plant. The new owners will exclusively supply Blanket with electricity from the current plant, on a take-or-pay basis. This transaction is expected to realise a profit on Caledonia's investment in the plant and release cash for reinvestment in Caledonia’s core business of gold mining that yields higher returns to our shareholders.
| 5 |
Encouraging drilling results at Blanket
The ongoing underground drilling program at Blanket targeted the Eroica ore body and has yielded encouraging results which were published on July 10, 2023. Approximately 5,600 meters of drilling were completed between January 2023 and the end of May 2023. Initial results indicate that the existing Eroica ore body has a better grade and width than was generally expected. In due course, this new information will be reflected in a revised resource statement and an updated technical report in respect of Blanket. Exploration is discussed further in section 5.
Fatality at Blanket
On August 7, 2023, an accident took place at Blanket. As a result, an employee of GMG Pty Ltd, a company contracted to Blanket, succumbed to his injuries in hospital. The accident related to the maintenance of trackless equipment. Caledonia and Blanket express their sincere condolences to the family and colleagues of the deceased. Management has provided the necessary assistance to the Ministry of Mines Inspectorate Department in its enquiries into the incident. Caledonia takes the safety of its employees and contractors very seriously and measures have been taken to reinforce adherence to prescribed safety procedures. Safety is discussed further in section 4.1.
Strategy and Outlook: increased focus on growth opportunities
The immediate strategic focus is to:
| · | maintain production at Blanket at the targeted range of 75,000 - 80,000 ounces for 2023 and at a similar level for 2024; |
| · | continue deep level drilling at Blanket with the objective of further upgrading inferred mineral resources, thereby extending the life of mine; |
| · | complete the Caledonia feasibility study on the Bilboes sulphide project to determine the best implementation strategy and estimate the funding requirements, and commence development of the sulphide project; and |
| · | commence exploration at Motapa. |
The strategy and outlook of Caledonia is further discussed in section 4.10
of this MD&A.
| 6 |
| 3. | SUMMARY FINANCIAL RESULTS |
The table below sets out the consolidated profit or loss for the Quarter and comparative quarter prepared under IFRS.
| Condensed Consolidated Statements of profit or loss and Other comprehensive income (Unaudited) | ||||||||||||||||
| ($’000’s) | ||||||||||||||||
| 3 months ended September 30 | 9 months ended September 30 | |||||||||||||||
| 2023 | 2022 | 2023 | 2022 | |||||||||||||
| Revenue | 41,187 | 35,840 | 107,653 | 107,904 | ||||||||||||
| Royalty | (2,207 | ) | (1,796 | ) | (5,650 | ) | (5,408 | ) | ||||||||
| Production costs | (20,452 | ) | (15,802 | ) | (61,028 | ) | (44,663 | ) | ||||||||
| Depreciation | (4,385 | ) | (2,670 | ) | (10,049 | ) | (7,372 | ) | ||||||||
| Gross profit | 14,143 | 15,572 | 30,926 | 50,461 | ||||||||||||
| Other income | 62 | 14 | 127 | 17 | ||||||||||||
| Other expenses | (701 | ) | (552 | ) | (2,800 | ) | (1,835 | ) | ||||||||
| Administrative expenses | (2,889 | ) | (2,789 | ) | (11,890 | ) | (8,068 | ) | ||||||||
| Net foreign exchange (loss) gain | (257 | ) | 1,559 | (2,334 | ) | 6,640 | ||||||||||
| Cash-settled share-based expense | (27 | ) | (25 | ) | (298 | ) | (335 | ) | ||||||||
| Equity-settled share-based expense | (233 | ) | (94 | ) | (564 | ) | (176 | ) | ||||||||
| Net derivative financial instrument expenses | (102 | ) | 537 | (590 | ) | (1,160 | ) | |||||||||
| Operating profit | 9,996 | 14,222 | 12,577 | 45,544 | ||||||||||||
| Net finance costs | (508 | ) | (9 | ) | (2,332 | ) | (300 | ) | ||||||||
| Profit before tax | 9,488 | 14,213 | 10,245 | 45,244 | ||||||||||||
| Tax expense | (3,777 | ) | (4,018 | ) | (8,552 | ) | (14,051 | ) | ||||||||
| Profit for the period | 5,711 | 10,195 | 1,693 | 31,193 | ||||||||||||
| Other comprehensive income | ||||||||||||||||
| Items that are or may be reclassified to profit or loss | ||||||||||||||||
| Exchange differences on translation of foreign operations | (79 | ) | (699 | ) | (778 | ) | (858 | ) | ||||||||
| Total comprehensive income for the period | 5,632 | 9,496 | 915 | 30,335 | ||||||||||||
| Profit (loss) attributable to: | ||||||||||||||||
| Owners of the Company | 4,506 | 8,614 | (1,036 | ) | 25,932 | |||||||||||
| Non-controlling interests | 1,205 | 1,581 | 2,729 | 5,261 | ||||||||||||
| Profit for the period | 5,711 | 10,195 | 1,693 | 31,193 | ||||||||||||
| Total comprehensive income attributable to: | ||||||||||||||||
| Owners of the Company | 4,427 | 7,915 | (1,814 | ) | 25,074 | |||||||||||
| Non-controlling interests | 1,205 | 1,581 | 2,729 | 5,261 | ||||||||||||
| Total comprehensive income for the period | 5,632 | 9,496 | 915 | 30,335 | ||||||||||||
| Earnings (loss) per share (cents) | ||||||||||||||||
| Basic | 24.1 | 65.4 | (6.8 | ) | 197.7 | |||||||||||
| Diluted | 14.7 | 65.4 | (5.5 | ) | 197.7 | |||||||||||
| Adjusted earnings per share (cents) | ||||||||||||||||
| Basic | 33.0 | 60.7 | 15.2 | 178.8 | ||||||||||||
| Dividends paid per share (cents) | 14.0 | 14.0 | 56.0 | 42.0 | ||||||||||||
| 7 |
Revenue in the Quarter was 14.9% higher than the comparative quarter due to a 7.8% increase in the quantity of gold sold and a 6.6% increase in the average realised price of gold sold.
The royalty rate payable to the Zimbabwe Government was unchanged at 5%.
Production costs increased by 29.4% in the Quarter compared to the comparative quarter. Production costs comprise the costs of electricity, labour and administrative costs and other costs such as insurance and security that are directly related to production. $17.1 million of production costs were incurred at Blanket (Q3 2022: $15,8 million) and $3.4 million was incurred at Bilboes (Q3 2022: nil). Production costs, in conjunction with on-mine and all-in sustaining costs per ounce of gold sold are discussed in section 4.6.
Administrative expenses are detailed in note 9 to the Interim Financial Statements and include the costs of Caledonia’s offices and personnel in Harare, Johannesburg, Bulawayo, the UK and Jersey which provide the following functions: technical services, finance, procurement, investor relations, corporate development, legal and company secretarial. Administrative expenses in the Quarter were 3.6% higher than the comparative quarter predominantly due to increased salaries and wages cost. Wages and salaries increased following the absorption of certain administrative and executive functions following the completion of the Bilboes transaction and an increase in headcount in the Mineral Resource Management team in Johannesburg to support the implementation of a digital resource modelling and mine planning system. The digital mine planning tools allow for more flexible mine planning which has already resulted in real-time amendments to the mine plan which should reduce future expenditure on capital development. An individual has also been recruited to improve the monitoring and reporting of the group’s environmental footprint in recognition of the increased stakeholder scrutiny on this area from stakeholders. The depreciation charge in the Quarter increased because of increase in the depreciable cost base following the commissioning of the Central Shaft and the solar plant. A reassessment of the useful lives of some plant and equipment items also increased the depreciation charge. The useful life of the Jethro Shaft reduced due to increased reliance to be placed on the new Central Shaft in the future. Furthermore, the useful life of certain generators, load haul dumpers, dump trucks and drill rigs reduced due to their current condition (refer to note 14 of the Interim Financial Statements).
Other expenses are detailed in note 8 to the Interim Financial Statements.
Net foreign exchange movements relate to gains and losses arising on monetary assets and liabilities that are held in currencies other than the USD – principally the RTGS$, but also the South African rand and the British pound. The net foreign exchange movement in the Quarter was lower than in the comparative quarter due to the relative stability of the RTGS$ against the USD during the Quarter as set out in section 4.10.
The tax expense comprised:
| Analysis of consolidated tax expense/(credit) for the Quarter | ||||||||||||||||||||
| ($’000’s) | Zimbabwe | South Africa | UK | Bilboes | Total | |||||||||||||||
| Income tax | 2,571 | 123 | - | - | 2,694 | |||||||||||||||
| Withholding tax | ||||||||||||||||||||
| Management fee | - | 44 | - | - | 44 | |||||||||||||||
| Deemed dividend | 107 | - | - | - | 107 | |||||||||||||||
| CHZ dividends to GMS-UK | - | - | - | - | - | |||||||||||||||
| Deferred tax | 928 | (41 | ) | - | 45 | 932 | ||||||||||||||
| 3,606 | 126 | - | 45 | 3,777 | ||||||||||||||||
The overall effective taxation rate for the Quarter was 39.8% (2022: 28.3%). The effective tax rate bears little relationship to reported consolidated loss before tax for the following reasons:
| · | Operating losses incurred at the Bilboes oxide mine cannot be offset against profits arising elsewhere in the group – thus they reduce consolidated profit before tax, with no commensurate reduction in the consolidated tax expense; |
| 8 |
| · | Zimbabwean taxable income is calculated in both RTGS$ and USD, whereas the group reports in USD. Large devaluations in the RTGS$ against the USD result in substantial foreign exchange movements on the RTGS$ tax payable which have a significant effect on the income tax calculation; |
| · | 100% of capital expenditure is tax deductible in the year in which it is incurred for tax purposes, whereas depreciation only commences when a project enters production; timing differences can alter the effective tax rate based on the capital expenditure for a quarter; and |
| · | The rate of income tax in Jersey, which is the tax domicile of the parent company of the Group (i.e. the Company), is zero which means there is no benefit to be realised by offsetting expenses incurred in Jersey against taxable profits. |
The effective taxation rate for Blanket was 26% (2022: 27%), which broadly corresponds to the enacted income tax rate in Zimbabwe which remained unchanged at 24.72%. Zimbabwe income tax payments are made in the same proportion of RTGS$ and USD as revenue is received. Deferred tax predominantly comprises the difference between the accounting and tax treatments of capital investment expenditure. Most of the tax expense comprised income tax and deferred tax incurred in Zimbabwe.
South African income tax arises on intercompany profits arising at Caledonia Mining South Africa Proprietary Limited (“CMSA”).
Zimbabwe withholding tax arose on the management fees paid to CMSA and on dividends paid from Caledonia Holdings Zimbabwe (Private) Limited (“CHZ”) to the Company’s subsidiary in the UK Greenstone Management Services Holdings Limited (“GMS-UK”).
IFRS basic EPS for the Quarter decreased by 63.2% from a profit of 65.4 cents in the comparative quarter to a profit of 24.1 cents. Adjusted EPS for the Quarter excludes inter alia the effect of foreign net exchange movements and deferred tax. Adjusted EPS reduced by 45.5% from a profit of 60.7 cents in the comparative quarter to 33.0 cents for the Quarter. A reconciliation from IFRS EPS to adjusted EPS is set out in section 10.3.
A dividend of 14 cents per share was paid in the Quarter. Caledonia’s dividends are discussed further in section 14.
Risks that may affect Caledonia’s future financial condition are discussed in section 17.
| 9 |
The table below sets out the consolidated statements of cash flows for the Quarter and the comparative quarter prepared under IFRS.
| Condensed Consolidated Statements of Cash Flows (Unaudited) | ||||||||||||||||
| ($’000’s) | ||||||||||||||||
3 months ended September 30 | 9 months ended September 30 | |||||||||||||||
| 2023 | 2022 | 2023 | 2022 | |||||||||||||
| Cash inflow from operations | 16,963 | 11,717 | 17,629 | 41,901 | ||||||||||||
| Interest received | 21 | 7 | 30 | 10 | ||||||||||||
| Finance costs paid | (331 | ) | (34 | ) | (1,762 | ) | (126 | ) | ||||||||
| Tax paid | (2,158 | ) | (2,767 | ) | (4,504 | ) | (5,993 | ) | ||||||||
| Net cash inflow from operating activities | 14,495 | 8,923 | 11,393 | 35,792 | ||||||||||||
| Cash flows used in investing activities | ||||||||||||||||
| Acquisition of property, plant and equipment | (9,573 | ) | (10,840 | ) | (20,175 | ) | (33,585 | ) | ||||||||
| Acquisition of exploration and evaluation assets | (597 | ) | (311 | ) | (880 | ) | (947 | ) | ||||||||
| Acquisition of put options | (1 | ) | - | (812 | ) | - | ||||||||||
| Net cash used in investing activities | (10,171 | ) | (11,151 | ) | (21,867 | ) | (34,532 | ) | ||||||||
| Cash flows from financing activities | ||||||||||||||||
| Dividends paid | (2,801 | ) | (2,709 | ) | (8,118 | ) | (7,197 | ) | ||||||||
| Payment of lease liabilities | (36 | ) | (36 | ) | (108 | ) | (115 | ) | ||||||||
| Repayments gold loan | - | - | - | (3,698 | ) | |||||||||||
| Proceeds from call options | - | 415 | - | 239 | ||||||||||||
| Shares issued - equity raise (net of transaction cost) | - | - | 15,658 | - | ||||||||||||
| Loan note instruments - Motapa payment | (563 | ) | - | (7,250 | ) | - | ||||||||||
| Loan note instruments - Solar bond issue receipts (net of transaction cost) | - | - | 7,000 | - | ||||||||||||
| Net cash from/(used in) financing activities | (3,400 | ) | (2,330 | ) | 7,182 | (10,771 | ) | |||||||||
| Net decrease in cash and cash equivalents | ||||||||||||||||
| Effect of exchange rate fluctuations on cash and cash equivalents | (1,209 | ) | (137 | ) | (1,396 | ) | (587 | ) | ||||||||
| Net cash and cash equivalents at beginning of the period | (2,907 | ) | 10,862 | 1,496 | 16,265 | |||||||||||
| Net cash and cash equivalents at end of the period | (3,192 | ) | 6,167 | (3,192 | ) | 6,167 | ||||||||||
Cash flows from operating activities in the Quarter are detailed in note 25 to the Interim Financial Statements. Cash inflows from operations before working capital changes in the Quarter were $16.3 million, compared to $13.7 million in the comparative quarter.
| 10 |
Cash flows from operations before working capital changes benefitted in the Quarter from higher production, partly offset by the high operating costs. Blanket continued to make a positive cash contribution of $16.6 million (Q3 2022: $16.7 million); the Bilboes oxide mine contributed a cash outflow of $2 million (Q3 2022: nil).
Working capital decreased by $0.7 million in the Quarter, which was primarily due to prepayments of $3.4 million made to suppliers for the new tailings storage facility (“TSF") and an increase in gold work in progress inventory (2,277 ounces), which was sold to Al-Etihad Gold Refinery shortly after Quarter end.
Finance costs paid in the Quarter increased due to interest of $18,000 on the loan notes which were issued in 2022 in part-consideration for the acquisition of Motapa, interest on the solar bonds discussed below of $214,000 and interest of $99,000 on overdraft facilities to accommodate working capital fluctuations at Blanket.
The acquisition of property plant and equipment relates to the investment at Blanket as discussed further in section 4.7; the investment in exploration and evaluation assets relates to the Bilboes oxide mine acquisition and the ongoing exploration work at Motapa and Maligreen.
Dividends for the Quarter comprise $2.7 million paid to shareholders of the Company. A dividend of 14 cents per share was announced on July 3, 2023.
The $0.6 million loan note repayment in the Quarter represented the final loan note settlement payment in respect of the purchase of the Motapa exploration and evaluation project.
The effect of exchange rate fluctuations on cash held reflects gains or losses on cash balances held in currencies other than the US Dollar. The effect on cash balances forms part of an overall foreign exchange gain or loss arising on all affected financial assets and liabilities.
| 11 |
The table below sets out the consolidated statements of Caledonia’s financial position at the end of the Quarter and December 31, 2022 prepared under IFRS.
| Summarised Consolidated Statements of Financial Position (Unaudited) | ||||||||||||
| ($’000’s) | As at | Sep-30 | Dec-31 | |||||||||
| 2023 | 2022 | |||||||||||
| Total non-current assets | 265,813 | 196,764 | ||||||||||
| Inventories | 18,826 | 18,334 | ||||||||||
| Prepayments | 5,093 | 3,693 | ||||||||||
| Trade and other receivables | 5,749 | 9,185 | ||||||||||
| Income tax receivable | - | 40 | ||||||||||
| Cash and cash equivalents | 10,775 | 6,735 | ||||||||||
| Derivative financial assets | 684 | 440 | ||||||||||
| Assets held for sale | 13,397 | - | ||||||||||
| Total assets | 320,337 | 235,191 | ||||||||||
| Total non-current liabilities | 18,211 | 9,291 | ||||||||||
| Loan notes payable – short term portion | 665 | 7,104 | ||||||||||
| Lease liabilities – short term portion | 138 | 132 | ||||||||||
| Trade and other payables | 17,459 | 17,454 | ||||||||||
| Income tax payable | 2,841 | 1,324 | ||||||||||
| Cash-settled share-based payments - short term portion | 674 | 1,188 | ||||||||||
| Derivative financial liabilities | 22 | - | ||||||||||
| Overdraft | 13,967 | 5,239 | ||||||||||
| Total liabilities | 53,977 | 41,732 | ||||||||||
| Total equity | 266,360 | 193,459 | ||||||||||
| Total equity and liabilities | 320,337 | 235,191 | ||||||||||
The acquisition of Bilboes increased the exploration and evaluation assets by $73.3 million for the 9 months ended September 30, 2023. Property, plant and equipment additions at Blanket amounted to $8.9 million in the Quarter and predominantly related to infrastructure development at 30 and 34 level and the construction of the new tailings storage facility at Blanket (“TSF”).
Inventories include 2,277 ounces of gold which was held by Fidelity Gold Refinery (Private) Limited ("FGR") in transit to Al Etihad Gold Refinery DMCC (“AEG”) which was sold in October 2023.
Prepayments represent deposits and advance payments for goods and services. $1.1 million of prepayments related to construction work on the new TSF which is discussed in section 4.7. Prepayments further increased by $1.2 million due to RTGS$ suppliers requiring larger deposits to protect against the weakening of the RTGS$ rate against the USD.
Trade and other receivables are detailed in note 18 to the Interim Financial Statements and include $1.1 million (December 31, 2022: $7.4 million) due from FGR in respect of the RTGS$ component of the revenues arising on gold deliveries prior to the close of business on September 30, 2023. All outstanding amounts due from FGR were received in full after the end of the Quarter. $3.7 million (December 31, 2022: $1 million) was due from the Zimbabwe Government in respect of VAT refunds.
Overdrafts are used for short-term working capital funding requirements in Zimbabwe. Expiration dates and terms of the overdrafts are set out in section 7 (Financing) and the overdraft facilities are expected to be renewed for 2024.
Most cash-settled share-based payments due to staff as at December 31, 2022 were settled in the first quarter. In April, 2023 the Company made awards of 79,894 Performance Units (“PUs”) and 93,035 Equity-settled share-based payments (“EPUs”) to certain management and employees within the Group pursuant to the provisions of the 2015 Omnibus Equity Incentive Compensation Plan (“OEICP”). 7,131 PUs were awarded to certain management and employees within the Group during the Quarter. The short-term portion of the cash-settled share-based payment liability is in respect of awards made to certain employees at Caledonia, CMSA and Blanket in terms of the OEICP. The awards (other than those made to certain executive officers (the “NEOs”) in 2023 which only settle in shares) can be settled in cash or, subject to conditions, shares at the option of the recipient.
| 12 |
The table below illustrates the distribution of the consolidated cash across the jurisdictions where the Group holds its cash:
| Geographical location of net cash ($’000’s) | ||||||||||||||||
| As at | Dec 31, | Mar 31, | Jun 30, | Sep 30, | ||||||||||||
| 2022 | 2023 | 2023 | 2023 | |||||||||||||
| Zimbabwe | (2,160 | ) | (9,749 | ) | (7,373 | ) | (8,052 | ) | ||||||||
| South Africa | 694 | 1,107 | 834 | 1,208 | ||||||||||||
| UK/Jersey | 2,962 | 11,831 | 3,632 | 3,652 | ||||||||||||
| Total net cash and cash equivalents | 1,496 | 3,189 | (2,907 | ) | (3,192 | ) | ||||||||||
Assets held for resale comprises the book value of the solar project which is the subject of an ongoing sale process as discussed in section 4.11.
The following information is provided for each of the eight most recent quarterly periods ending on the dates specified. The amounts are extracted from underlying financial statements that have been prepared using accounting policies consistent with IFRS.
| ($’000’s except per share amounts) | Dec 31, | Mar 31, | Jun 30, | Sep 30, | Dec 31, | Mar 31, | Jun 30, | Sep 30, | ||||||||||||||||||||||||
| 2021 | 2022 | 2022 | 2022 | 2022 | 2023 | 2023 | 2023 | |||||||||||||||||||||||||
| Revenue | 32,136 | 35,072 | 36,992 | 35,840 | 34,178 | 29,435 | 37,031 | 41,187 | ||||||||||||||||||||||||
| Profit/(loss) attributable to owners of the Company | 4,222 | 5,940 | 11,378 | 8,614 | (8,029 | ) | (5,030 | ) | (513 | ) | 4,506 | |||||||||||||||||||||
| EPS – basic (cents) | 33.3 | 44.6 | 87.7 | 63.3 | (62.2 | ) | (30.3 | ) | (0.6 | ) | 24.1 | |||||||||||||||||||||
| EPS – diluted (cents) | 33.3 | 44.6 | 87.7 | 63.3 | (62.2 | ) | (30.2 | ) | (0.6 | ) | 14.7 | |||||||||||||||||||||
| Net cash and cash equivalents | 16,265 | 14,430 | 10,862 | 6,167 | 1,496 | 3,189 | (2,907 | ) | (3,192 | ) |
| 13 |
| 4. | OPERATIONS |
| 4.1 | Safety, Health and Environment |
| 4.1.1 | Blanket |
The following safety statistics have been recorded for the Quarter and the preceding seven quarters.
| Blanket mine Safety Statistics | ||||||||||||||||||||||||||||||||
Classification | Q4 2021 | Q1 2022 | Q2 2022 | Q3 2022 | Q4 2022 | Q1 2023 | Q2 2023 | Q3 2023 | ||||||||||||||||||||||||
| Fatal | 0 | 1 | 0 | 0 | 0 | 1 | 0 | 0 | ||||||||||||||||||||||||
| Lost time injury | 2 | 0 | 2 | 1 | 1 | 0 | 5 | 2 | ||||||||||||||||||||||||
| Restricted work activity | 1 | 0 | 1 | 1 | 2 | 6 | 7 | 5 | ||||||||||||||||||||||||
| First aid | 0 | 2 | 3 | 0 | 0 | 1 | 0 | 0 | ||||||||||||||||||||||||
| Medical aid | 8 | 6 | 3 | 1 | 2 | 4 | 0 | 1 | ||||||||||||||||||||||||
| Occupational illness | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||
| Total | 11 | 9 | 9 | 3 | 5 | 12 | 12 | 8 | ||||||||||||||||||||||||
| Incidents | 10 | 9 | 10 | 14 | 6 | 14 | 3 | 10 | ||||||||||||||||||||||||
| Near misses | 2 | 4 | 7 | 6 | 1 | 4 | 4 | 4 | ||||||||||||||||||||||||
| Disability Injury Frequency Rate | 0.24 | 0.12 | 0.36 | 0.22 | 0.33 | 0.80 | 1.35 | 0.71 | ||||||||||||||||||||||||
| Total Injury Frequency Rate | 1.58 | 1.07 | 1.08 | 0.34 | 0.56 | 1.36 | 1.35 | 0.81 | ||||||||||||||||||||||||
| Man-hours worked (000’s) | 1,643 | 1,686 | 1,672 | 1,788 | 1,801 | 1,760 | 1,780 | 1,982 | ||||||||||||||||||||||||
In August, 2023 Caledonia reported that an employee of a company contracted to Blanket died of injuries sustained in an accident at Blanket.
The number of incidents as reflected in the Total Injury Frequency Rate decreased in the Quarter. Blanket’s safety performance compares favourably with other deep level underground gold mines; however, management believes the safety performance at Blanket could be better. The Nyanzvi 2 initiative (discussed below) is designed to increase safety awareness and reinforce strict adherence to prescribed safety procedures.
Nyanzvi Initiative
During the Quarter, Nyanzvi 1 training sessions were held for all the new employees including those reassigned from Bilboes. Nyanzvi 2 was launched in the Quarter with a focus on team and personal development, business skills, management systems (daily, weekly and monthly), incentives, monthly rewards and performance recognition. This programme addresses the skills shortages and behavioural and training deficits that contributed to production issues in the first half of the year. An industrial theatre group was established to improve safety behaviour with an emphasis on every employee being their co-workers’ safety-keepers and practising “stop-think-fix-and-continue" methodology. This programme is strengthened through on-the-job-training of the poorly performing supervisors and teams by experienced mining professionals.
| 14 |
| 4.1.2 | Bilboes oxide mine |
The following safety statistics have been recorded for the Quarter and the preceding quarter since acquisition.
| Bilboes Oxide Mine Safety Statistics | ||||||||
|
Classification |
Q1 2023 |
Q2 2023 |
Q3 2023 | |||||
| Minor injury | 0 | 2 | 0 | |||||
| Lost time injury | 0 | 0 | 0 | |||||
| Occupational Health | 0 | 0 | 0 | |||||
| Total | 0 | 2 | 0 | |||||
| Incidents | 9 | 15 | 2 | |||||
| Near misses | 2 | 5 | 2 | |||||
| Lost Time Injury Frequency Rate | 0 | 0 | 0 |
| 4.2 | Social Investment and Contribution to the Zimbabwean Economy – Blanket |
Blanket’s investment in community and social projects (“CSR”) which are not directly related to the operation of the mine or the welfare of Blanket’s employees, the payments made to the Gwanda Community Share Ownership Trust (“GCSOT”) in terms of Blanket’s indigenisation, and payments of taxation and other non-taxation charges to the Zimbabwe Government and its agencies are set out in the table below.
| Payments to the Community and the Zimbabwe Government | ||||||
| ($’000’s) | ||||||
| Period | Year | CSR Investment | Payments to GCSOT | Payments to Zimbabwe Government (excl. royalties) | Royalties | Total |
| Year | 2013 | 2,147 | 2,000 | 15,354 | 4,412 | 23,913 |
| Year | 2014 | 35 | - | 12,319 | 3,522 | 15,876 |
| Year | 2015 | 50 | - | 7,376 | 2,455 | 9,881 |
| Year | 2016 | 12 | - | 10,637 | 2,923 | 13,572 |
| Year | 2017 | 5 | - | 11,988 | 3,498 | 15,491 |
| Year | 2018 | 4 | - | 10,140 | 3,426 | 13,570 |
| Year | 2019 | 47 | - | 10,357 | 3,854 | 14,258 |
| Year | 2020 | 1,689 | 184 | 12,526 | 5,007 | 19,406 |
| Year | 2021 | 1,163 | 948 | 16,426 | 6,083 | 24,620 |
| Year | 2022 | 888 | 1,200 | 19,184 | 7,124 | 28,396 |
| Q1 | 2023 | 258 | - | 3,769 | 1,471 | 5,498 |
| Q2 | 2023 | 326 | - | 3,356 | 1,856 | 5,538 |
| Q3 | 2023 | 336 | 200 | 2,725 | 2,096 | 5,607 |
CSR initiatives fall under seven pillars of education, health, women empowerment and agriculture, environment, charity, youth empowerment and conservation.
| 15 |
The main CSR programme at Blanket relates to the refurbishment of the maternity clinic, the primary and secondary schools and the youth centre at Sitezi, which is located approximately 17km from Blanket. Activities in respect of this project during the Quarter include:
| · | completing renovations of five classrooms, three offices, one computer laboratory, and one science laboratory at Sitezi Secondary School. The renovations included reglazing of all the classrooms, offices, and laboratory, furnishing the science laboratory with experimenting desks, laboratory stools, wall cupboards, chemical waste disposal channels and fossil display cabinets. The computer lab was also furnished with cubicles, desks, and chairs for the students and teacher. Ceilings were also put up in two classrooms and both laboratories. |
| · | repairs to the clinic’s water reticulation system were completed. Building materials were delivered to the Sitezi clinic for the construction of a waiting mothers’ shelter in the Quarter. |
| · | A small solar power plant will be constructed to supply the clinic, secondary school and primary school. The solar power will help maintain cold chains for medical supplies and samples at the clinic and provide lighting and energy supply to the clinic and the two schools for powering IT equipment such as computers and interactive boards. During the Quarter the overhead electricity line was installed to connect the clinic to the eventual site of the solar project. |
| · | To ensure a secure and stable supply of water for the Guqukani Garden irrigation scheme, Blanket continued supplying irrigation water to the garden from Smiler shaft. The water augmentation project to connect four boreholes to the garden which began during the second quarter continued in the current quarter. Pipes for the pipeline were laid out, and connection to the national electricity grid is scheduled for the last quarter of 2023. The garden currently has 1 hectare of maize at knee level, 0.5 hectares of maize at germination stage, and 0.5 hectares of tomatoes that are sold locally. |
| · | Work on upgrading the Sabiwa Stadium to meet the requirements of the Zimbabwe Football Association for Division 1/Premier Soccer League stadia in the country continued with the extension of the pitch and running tracks. The stadium, which had been used exclusively by Sabiwa High School, will cater for footballing activities for the entire local community. |
Blanket undertook road repairs of the old Gwanda Road, patching the potholes on the road which had become a hazard. Further work is expected in the last quarter of 2023 as the rainy season commences.
Under the conservation pillar, Dambari Wildlife Trust was granted $113,000 to carry out its work on conserving black and white rhinos in the Matopos Hills areas. The grant is disbursed in tranches at given periods throughout the year upon request. Dambari Trust is working with Victoria Falls Wildlife Trust as its subgrantee.
A dividend of $200,000 was paid to GCSOT in the Quarter. GCSOT has a 10% shareholding in Blanket.
| 16 |
| 4.3 | Gold Production – Blanket |
| Blanket mine Production Statistics | |||||
| Year |
Tonnes Milled (t) |
Gold Head (Feed) Grade (g/t Au) |
Gold Recovery (%) |
Gold Produced (oz) | |
| Year | 2020 | 597,962 | 3.21 | 93.8 | 57,899 |
| Q 1 | 2021 | 148,513 | 2.98 | 93.0 | 13,197 |
| Q 2 | 2021 | 165,760 | 3.34 | 93.8 | 16,710 |
| Q 3 | 2021 | 179,577 | 3.48 | 94.2 | 18,965 |
| Q 4 | 2021 | 171,778 | 3.57 | 94.3 | 18,604 |
| Year | 2021 | 665,628 | 3.36 | 93.9 | 67,476 |
| Q1 | 2022 | 165,976 | 3.69 | 94.1 | 18,515 |
| Q2 | 2022 | 179,118 | 3.71 | 93.9 | 20,091 |
| Q3 | 2022 | 198,495 | 3.53 | 93.6 | 21,120 |
| Q4 | 2022 | 208,444 | 3.37 | 93.7 | 21,049 |
| Year | 2022 | 752,033 | 3.56 | 93.8 | 80,775 |
| Q1 | 2023 | 170,721 | 3.11 | 93.8 | 16,036 |
| Q2 | 2023 | 179,087 | 3.22 | 94.0 | 17,436 |
| Q3 | 2023 | 208,902 | 3.46 | 93.7 | 21,772 |
| October | 2023 | 67,117 | 3.38 | 94.3 | 6,885 |
Gold production for the Quarter was 3.1% higher than the comparative quarter due to the higher tonnes mined and milled. Tonnes milled and grade are discussed in section 4.4 of this MD&A; gold recoveries are discussed in section 4.5 of this MD&A.
| 4.4 | Underground – Blanket |
A record of 208,902 milled tonnes were achieved during the Quarter, which is 5.2% higher than the comparative quarter; the recovered grade for the Quarter was 1.98% below the grade in the comparative quarter. The increased production is due to the elimination of bottlenecks which were experienced in previous quarters such as big boulders due to poor blasting practices and tramming breakdowns. Production also benefitted from increased flexibility due to a higher number of available stope faces.
| 4.5 | Metallurgical Plant |
Recoveries in the Quarter were 93.7% compared to 93.6% in the comparative quarter; the tail grade of 0.192g/t was lower than achieved in previous quarters and demonstrates the efficiency of the metallurgical plant in terms of overall recoveries.
| 17 |
| 4.6 | Costs |
A narrow focus on the direct costs of production (mainly labour, electricity and consumables) does not fully reflect the total cost of gold production. Accordingly, cost per ounce data for the Quarter and the comparative quarter have been prepared in accordance with the Guidance Note issued by the World Gold Council on June 23, 2013 and is set out in the table below on the following bases:
| i. | On-mine cost per ounce3, which shows the on-mine costs of producing an ounce of gold and includes direct labour, electricity, consumables and other costs that are incurred at the mine including insurance, security and on-mine administration; |
| ii. | All-in sustaining cost per ounce3, which shows the on-mine cost per ounce plus royalty paid, additional costs incurred outside the mine (i.e., at offices in Harare, Bulawayo, Johannesburg and Jersey), costs associated with maintaining the operating infrastructure and resource base that are required to maintain production at the current levels (sustaining capital investment), the share-based expense (or credit) arising from the awards made to employees under the OEICP less silver by-product revenue; and |
| iii. | All-in cost per ounce3, which shows the all-in sustaining cost per ounce plus the costs associated with activities that are undertaken with a view to increasing production (expansion capital investment). |
| Cost per ounce of gold sold | ||||||||||||||||||||||||||||||||||||||||||||||||
| (US$/ounce) | ||||||||||||||||||||||||||||||||||||||||||||||||
| Bilboes Oxide | Blanket | Consolidated | ||||||||||||||||||||||||||||||||||||||||||||||
| 3 months ended Sep 30 | 9 months ended Sep 30 | 3 months ended Sep 30 | 9 months ended Sep 30 | 3 months ended Sep 30 | 9 months ended Sep 30 | |||||||||||||||||||||||||||||||||||||||||||
| 2023 | 2022 | 2023 | 2022 | 2023 | 2022 | 2023 | 2022 | 2023 | 2022 | 2023 | 2022 | |||||||||||||||||||||||||||||||||||||
| On-mine cost per ounce3 | 2,895 | - | 4,647 | - | 817 | 734 | 900 | 709 | 928 | 734 | 1,056 | 709 | ||||||||||||||||||||||||||||||||||||
| All-in sustaining cost per ounce3 | 2,990 | - | 4,744 | - | 1,171 | 962 | 1,191 | 933 | 1,268 | 962 | 1,339 | 933 | ||||||||||||||||||||||||||||||||||||
| All-in cost per ounce3 | 3,059 | - | 6,041 | - | 1,438 | 1,454 | 1,460 | 1,534 | 1,525 | 1,454 | 1,650 | 1,534 | ||||||||||||||||||||||||||||||||||||
A reconciliation of costs per ounce to IFRS production costs is set out in section 10.
On-mine cost
On-mine cost comprises labour, electricity, consumables, and other costs such as security and insurance which are directly related to production. Production costs are detailed in note 7 to the Interim Financial Statements. On-mine cost includes the procurement margin paid to CMSA and represent a fair value that Blanket would pay for consumables if they were sourced from a third party.
On-mine cost per ounce for the Quarter was 26.4% higher than the comparative quarter due to the increased production costs as discussed in section 3 of this MD&A.
The increase in on-mine cost per ounce compared to the comparative quarter is illustrated in the graph below.
3On-mine cost per ounce, all-in sustaining cost per ounce and all-in cost per ounce are non-IFRS measures. Refer to section 10 for a reconciliation of these amounts to IFRS.
| 18 |

The cost of oxide mining at Bilboes contributed $142 per ounce to the overall increase in the on-mine cost per ounce. The large amount of waste that was moved to access the oxide mineralisation proved costly and Bilboes had an on-mine cost of $2,895 per ounce in the Quarter. Due to the oxide mining activities incurring losses, it was placed on care and maintenance at the end of September 2023. The net book value of the Bilboes oxide mine of $851,000 was impaired in the second quarter of 2023, as the oxide mine could not be run economically without including the sulphide project and justify the waste removal for the optimum pit design over more ounces. Leaching of the oxide ore on the heap leach pad will continue until the end of the year to recover gold deposited on the leach pad prior to the termination of oxide mining. Bilboes is discussed further in section 4.9.
Production costs at Blanket for the Quarter increased from the comparative quarter by 8.1% and Blanket's on-mine cost increased by 11.3% from $734 per ounce in the comparative quarter to $817 per ounce in the Quarter. Production costs at Blanket for the Quarter increased due to the higher than anticipated use of electricity due to the continued heavy use of infrastructure such as the No. 4 Shaft and Jethro Shaft which had been expected to be used more sparingly following the commissioning of the Central Shaft. Management is reviewing what shafts and machinery could be shut down or used more efficiently, thereby reducing power consumption in 2024.
In April 2023 Blanket concluded a power supply agreement with the Intensive Energy Users Group (“IEUG") and the Zimbabwean power utility to allow the IEUG to obtain power outside Zimbabwe which is "wheeled” to the IEUG members. During the Quarter Blanket paid less for IEUG sourced energy but the incidences of power outages and low voltage occurrences did not reduce due to the poor condition of the Zimbabwe grid which meant that diesel costs were incurred to supplement the low voltage occurrences. Notwithstanding the foregoing, 401k litres of diesel were used in the Quarter compared to 677k litres in the comparable quarter, the reduction being due to the commissioning of the solar plant in early 2023. Management is conducting a study on how to alleviate the effect of the low voltage occurrences in the most economical manner.
| 19 |
The benefit of the solar plant is not recognised in on-mine cost because the solar plant (which is 100% owned by Caledonia) sells power to Blanket at a price per kilowatt/hour which reflects Blanket's historic blended cost per unit of power. The economic benefit of the solar plant is therefore recognised by Caledonia, rather than by Blanket, and the benefit ($38 per ounce of gold produced) is reflected in the AISC rather than the on-mine cost. The solar plant had the added benefit of stabilising the Blanket electrical grid by improving the power factor and in turn reducing generator usage to supplement reactive power.
Labour costs at Blanket increased during the Quarter due to increased overtime hours, increased employment numbers at Blanket and inflationary increases. Management is investigating measures to utilise its workforce more efficiently and reduce overtime in future quarters.
Consumable costs per ounce at Blanket in the Quarter increased compared to the comparative quarter due to the cost to truck ore from the Central shaft to the metallurgical plant which is located close to the No. 4Shaft area and increased explosive costs. Management is performing a cost study to assess the benefit of installing a conveyor to transport ore from Central Shaft to the metallurgical plant; an investigation has started to improve blasting techniques.
Various government service payments increased in the Quarter compared to the comparative quarter which increased on-mine cost by $8 per ounce compared to the comparative quarter.
All-in sustaining cost
All-in sustaining cost includes inter alia administrative expenses incurred outside Zimbabwe and excludes the intercompany procurement margin and the benefits of solar power as this reflects the consolidated cost incurred at the Group level. Accordingly, the all-in sustaining cost can only be calculated at a consolidated level and not at the level of individual operations. The all-in sustaining cost per ounce for the Quarter was 31.8% higher than the comparative quarter due to the higher on mine costs, a higher royalty cost per ounce due to the higher realised gold price and higher sustaining capital expenditure and sustaining administrative costs. This was mitigated somewhat by an increase in the intercompany procurement margin (which is deducted from on-mine cost for the purposes of calculating the consolidated AISC). The increase in AISC per ounce in the Quarter compared to the comparative quarter is illustrated in the graph below:
| 20 |
All-in cost
All-in cost includes investment in expansion projects at Blanket and Bilboes which remained at a high level in the Quarter due to the continued investment, as discussed in section 4.7 of this MD&A. All-in cost does not include pre-feasibility investment in exploration and evaluation projects.
| 4.7 | Capital Projects – Blanket |
The main capital development project is the infrastructure which will allow for three new production levels (26, 30 and 34 levels); a fourth level (38 level) is to be added in due course via a twin decline that commenced in February this year. 5,942 development metres were achieved in the Quarter compared to 5,207 metres in the previous quarter.
Work on key development areas in the Quarter are detailed below:
| · | 30 and 34 level development: the northern and southern haulages on 30 and 34 level progressed well for the Quarter with a total advance of 557m. The 30-level northern haulage is within 100m of reaching the Eroica orebody. |
| · | Eroica decline 3: the decline development has been behind schedule due to logistical issues but in the Quarter there was an improvement with an advance of 132m. The target is to reach 900m in Quarter 4 whereupon development will be stopped to cater for up-dip development from 990m (30 level), which is expected to result in a saving against planned capital expenditure in 2024. This real-time modification to the mine plan was enabled by the recent introduction of the digital resource and mine planning software. |
| · | 930 2 Orebody Hanging Wall Haulage (“2OBHW”): the development of the haulage progressed well in the Quarter with an advance of 163m. The haulage will continue so that the southern extension of the 2OBHW can be exposed for production. The haulage is also important for the establishment of an access crosscut to link 6 Shaft on 930m and will present an opportunity to utilise the shaft. |
| · | 34 – 38 level twin declines: the twin declines are earmarked to access the Blanket orebodies on 38 level. The development of the declines will open mining areas below 34 level with one serving as an access route where a chairlift system will be installed, and the other as a return airway system where a conveyor system will be installed. In the Quarter a total advance of 289m was achieved. |
| · | 35 level Central Shaft: at 34 and 35 level Central Shaft clear and dirty water dams are still under construction and are expected to be completed by the end of the fourth quarter. |
| · | 35 level conveyor: the installation of hydraulic power packs and cylinders was completed during the Quarter. The outstanding work is the subsequent conversion of the spillage loading system from compressed air to hydraulics. The removal of accumulation of spillage in the shaft is going to be attended to in the fourth quarter of 2023. |
The existing TSF at Blanket is reaching the end of its life; accordingly, a new TSF is required to allow production to continue. The design parameters for the new facility include:
| · | capacity of 13 million tonnes which is anticipated to be adequate for 14 years of production at current deposition rate; |
| · | “upstream” design, due to the limited space; |
| · | clear water dam and tailings facility will be lined with a double lining (geotextile and clay liner) and polyurethane liner respectively to avoid contamination of ground water; |
| · | the design includes new piping and new pumps for a gland service water and return water system with instrumentation; |
| · | new boreholes for monitoring around the facility; and |
| · | a waste embankment between the TSF and the village for dust prevention. |
| 21 |
The anticipated cost of the new TSF is $25.1 million which will be incurred over a period of 3 years. Work on the TSF commenced in March 2023 and the first phase of the project was expected to be completed by the end of the Quarter. The project is behind schedule due to resourcing by the contractor and changes in the design by an external consultant. The contractor had to change the program slightly to re-focus on the lowest areas of the TSF basin to allow limited deposition on the new TSF by end of October 2023 in parallel with further deposition onto the existing TSF until it reaches its maximum capacity. Deposition on the new TSF commenced after the end of the Quarter; the delay in the project is not expected to have any impact on production and the project remains within budget.
| 4.8 | Indigenisation |
As set out in previous MD&A’s, transactions that implemented the indigenisation of Blanket (which expression in this section and in certain other sections throughout this MD&A refers to the Zimbabwe company that owns Blanket) were completed on September 5, 2012 following which Caledonia owned 49% of Blanket.
Following the appointment of President Mnangagwa in 2017, the requirement for gold mining companies to be indigenised was removed by a change in legislation with effect from March 2018. On November 6, 2018, the Company announced that it had entered into a sale agreement with Fremiro Investments (Private) Limited (“Fremiro”) to purchase Fremiro’s 15% shareholding in Blanket for a gross consideration of $16.7 million, which was to be settled through a combination of the cancellation of the loan between the two entities which stood at $11.5 million as at June 30, 2018 and the issue of 727,266 new shares in Caledonia at an issue price of $7.15 per share. This transaction was completed on January 20, 2020 following which Caledonia has a 64% shareholding in Blanket and Fremiro held approximately 6.3% of Caledonia’s enlarged issued share capital.
As a 64% shareholder, Caledonia receives 64% of Blanket’s dividends plus the repayment of vendor facilitation loans which were extended by Blanket to certain of the indigenous shareholders. The outstanding balance of the facilitation loans at September 30, 2023 was $13.4 million (December 31, 2022: $15 million). The facilitation loans (including interest thereon) are repaid by way of dividends from Blanket; 80% of the dividends declared by Blanket which are attributable to the beneficiaries of the facilitation loans are used to repay such loans and the remaining 20% unconditionally accrues to the respective indigenous shareholders. The dividends attributable to GCSOT, which holds 10% of Blanket, were withheld by Blanket to repay the advance dividends which were paid to GCSOT in 2012 and 2013.
The final payment to settle the advance dividend loan to GCSOT was made on September 22, 2021. Dividends to GCSOT after that date are unencumbered.
The facilitation loans are not shown as receivables in Caledonia’s financial statements in terms of IFRS. These loans are effectively equity instruments as their only means of repayment is via dividend distributions from Blanket. Caledonia continues to consolidate Blanket for accounting purposes. Further information on the accounting effects of indigenisation at Blanket is set out in note 6 to the Interim Financial Statements.
| 22 |
| 4.9 | Bilboes |
Sulphides feasibility study
The main objective at Bilboes is to construct a large, open-pit operation to extract sulphide mineralisation. A feasibility study in respect of the Bilboes sulphide project was prepared by the previous owners which targeted mine and processing operations to produce an average of 168,000 ounces of gold per annum over a 10-year life of mine.
Caledonia has commissioned its own feasibility study for the sulphide project reflecting the prevailing economic environment for capital and operating costs and a revised outlook for the gold price. The new feasibility study will identify the most judicious way to commercialise the project in terms of maximising the uplift in value for Caledonia shareholders and this may result in the project potentially being implemented on a phased basis.
Work to refresh the existing feasibility study for a large-scale project is well-advanced. However, the development of feasibility for an alternative, smaller scale initial project is effectively a new project which requires inter alia new pit designs and a completely different approach to the processing and metallurgical plant. Accordingly, this second approach will take longer to prepare, and the initial results will be to the level of a Preliminary Economic Analysis. The preliminary results of this second exercise are expected in early 2024 after which an indeterminate period will be required to review and, if necessary, optimise the preliminary output. Management needs to await the results of both studies (i.e. large scale and small scale) before it can identify the most effective development route from the perspective of optimal capital allocation.
Oxide mining activities
In the fourth quarter of 2022, a small operation was started to mine and process oxide mineralisation at Bilboes. The oxide mining activities were restarted predominantly with the objective to generate cash flows to pay for the existing cost structures at Bilboes Holdings (Private) Limited (“Bilboes Holdings”), the operating company for Bilboes, and this would have an added benefit of reducing the waste-stripping required for the later planned sulphide project. The oxide mine was expected to produce between 12,500 and 17,000 ounces of gold in 2023 at an on-mine cost of between $1,200 and $1,320 per ounce.
As disclosed in the previous quarter, the target mineralisation area which had been identified using old information obtained from the previous owners (i.e. not the vendors from whom Caledonia purchased the project) was found not to exist. Mining activity moved to other target areas in the Quarter where the target oxide mineralisation is based on relatively recent drill data for the oxide mineralisation. However, the large amount of waste-stripping that needed to be done to access the oxide production areas proved too costly. Accordingly, to prevent further operating losses, the oxide mining activities were placed on care and maintenance at the end of September 2023. Oxide mining activities will resume in due course in conjunction with the larger sulphide project. Leaching of ore placed on the heap leach will continue until December 2023, but this will not have a material effect on Caledonia's future financial performance.
Production and cost guidance for the oxide mining activities was withdrawn in the previous quarter.
| Bilboes Oxides: Operating Statistics | |||
| 3 months to September 30, 2023 |
9 months to September 30, 2023 | ||
| Waste mined | (t) | 518,865 | 2,019,437 |
| Ore mined | (t) | 60,154 | 154,050 |
| Ore grade | (g/t) | 1.13 | 1.15 |
| Contained gold | (g) | 67,732 | 177,216 |
| Gold sales | (g) | 35,792 | 72,894 |
| Gold sales | (oz) | 1,151 | 2,344 |
| Strip Ratio | 8.6 | 13 | |
| 23 |
| 4.10 | Zimbabwe Commercial Environment |
Monetary Conditions
The current situation in Zimbabwe can be summarised as follows:
| · | Blanket produces ore gold that it is obliged to deliver to FGR, a subsidiary of the RBZ, which refines the gold to a purity of 99.5% on a toll-treatment basis for 75 per cent of its production. Caledonia retains ownership of the gold at this stage. 75% of Blanket's gold is exported by Caledonia to a refiner of its choice outside Zimbabwe which undertakes further processing and sells the resulting gold on the international market. During the Quarter, all gold exports were sent to Al Etihad Gold Refinery DMCC in Dubai. The sale proceeds for the gold exported and sold via the offshore refiner is paid to Blanket’s commercial bankers in Zimbabwe within 48 hours of delivery. Management believes this new sales mechanism reduces the risk associated with selling and receiving payment from a single refining source in Zimbabwe. It also creates the opportunity to use more competitive offshore refiners and it may allow for the Company to raise debt funding secured against offshore gold sales. 25% of Blanket's gold is sold to FGR at a price which reflects the prevailing London Bullion Market Association price and the official RTGS$/USD exchange rate on the date of sale. Payment is made by FGR to Blanket in RTGS$ within 14 days of the sale. FGR deducts 1.25% from the gross sale proceeds and a further 5% in respect of the royalty on gold sales which is payable to the Government of Zimbabwe and deducted from USD and RTGS$ revenues proportionately. |
| · | From August 2023 Caledonia was allowed to participate in the RBZ auction market to exchange surplus RTGS$ to USD at, an exchange rate that was similar to the exchange rate at which Caledonia received the portion of its revenues that are paid in RTGS$ to pay in-country operating expenditures in USD and to make payments outside Zimbabwe. The Group was granted a letter of credit to convert the RTGS$ balances at Quarter end to foreign currency. |
| · | The interbank RTGS$/USD exchange rates at each quarter end and at the latest practicable date prior to the publication of this MD&A are set out below. |
|
Interbank Exchange Rates (RTGS$:US$1) | |
| February 20, 2019 | 2.50 |
| March 31, 2019 | 3.00 |
| June 30, 2019 | 6.54 |
| September 30, 2019 | 15.09 |
| December 31, 2019 | 16.77 |
| March 31, 2020 | 25.00 |
| June 30, 2020 | 57.36 |
| September 30, 2020 | 81.44 |
| December 31, 2020 | 81.79 |
| March 31, 2021 | 84.40 |
| June 30, 2021 | 85.42 |
| September 30, 2021 | 87.67 |
| December 31, 2021 | 108.66 |
| March 31, 2022 | 142.42 |
| June 30, 2022 | 370.96 |
| September 30, 2022 | 621.89 |
| December 31, 2023 | 684.33 |
| March 31, 2023 | 913.67 |
| June 30, 2023 | 5,739.80 |
| September 30, 2023 | 5,466.75 |
| October 31, 2023 | 5,698.96 |
| 24 |
Electricity supply
The poor quality of electricity supply from the Zimbabwe Electricity Supply Authority (“ZESA”) is the most significant production risk at Blanket. During the Quarter, Blanket experienced interruptions to its power supply from the grid due to an imbalance between electricity demand and supply.
The supply from the grid is also subject to frequent surges and dips in voltage which, if not controlled, may cause severe damage to Blanket’s electrical equipment. The continued deterioration in the ZESA supply means that the power factor regularly fell to 60%, which meant that Blanket was effectively paying for 100% of the power but received only 60% and the power supply is subject to outages.
In the absence of equipment to control these surges, Blanket needs to switch to diesel power to allow mining and processing activity to continue, but generator use increases production costs and capital expenditure.
The following initiatives have been implemented by Blanket to alleviate the power challenges:
| · | Over recent years it increased its diesel generating capacity to 18MW of installed capacity which was sufficient to maintain all operations and capital projects but only on a stand-by basis. |
| · | Installed two 10MVA auto tap transformers on the ZESA supply line to protect equipment at No. 4 Shaft and the main metallurgical plant from voltage fluctuations on the incoming grid supply. |
| · | Two further 10MVA auto tap transformers were installed to protect equipment at Central Shaft. |
| · | Caledonia’s 12.2Mwac solar plant, fully commissioned in early February 2023, provides approximately 24% of Blanket’s average daily electricity demand. The plant has been providing power to Blanket from its initial connection to the Blanket grid in November 2022. The project was completed at a cost of $14.2 million in 2023 (cost includes construction costs and other project planning, structuring, funding and administration costs). This is discussed further in section 4.13. |
| · | In April 2023 Blanket entered into a power supply agreement with the IEUG and the Zimbabwean power utility to allow the IEUG to obtain power outside of Zimbabwe and strengthen the Zimbabwean power grid. As a result of this arrangement, Blanket has paid a lower tariff for IEUG supplied energy from April 2023 but it has not improved the power quality received at Blanket due to the continued difficulty with the Zimbabwe grid. |
Management is investigating options to alleviate the instability in the utility supply and further reduce the cost of diesel generator usage to supplement low voltage occurrences and power outages. Further investigations are in process to reduce Blanket's overall electricity consumption by utilizing the available shafts and machinery more efficiently.
Water supply
Blanket uses water in the metallurgical process. Blanket is situated in a semi-arid region and rainfall typically only occurs in the period November to February. The 2022/2023 rainy season has been adequate, and management believes the water supply is satisfactory.
Taxation
The main elements of the Zimbabwe tax regime insofar as it affects Blanket and Caledonia are as follows:
| · | A royalty is levied on gold revenues at a rate of 5% if the gold price is above $1,200 per ounce; a royalty rate at 3% applies if the gold price is below $1,200. With effect from January 1, 2020, the royalty is allowable as a deductible expense for the calculation of income tax. On October 9, 2022, the Zimbabwean government announced that 50% of royalty payments will be payable in gold. The announcement was effective October 1, 2022 but no guidance has been received from government on how this will be implemented. Management does not expect a material effect due to this announcement. |
| 25 |
| · | With effect from February 4, 2022 the 5% royalty was payable in the same proportions of currencies as revenues are received. |
| · | Income tax is levied at 24.72% (2022: 24.72%) on taxable income as adjusted for tax deductions. The main adjustments to taxable income for the purposes of calculating tax are the add-back of depreciation and most of the management fees paid by Blanket to CMSA. 100% of all capital expenditure incurred in the year of assessment is allowed as a deductible expense. As noted above, the royalty is deductible for income tax purposes with effect from January 1, 2020. The calculation of taxable income is performed using financial accounts prepared in USD and RTGS$ with actual payments split between USD and RTGS$ based on the proportions in which income was received. Large devaluations in the RTGS$ to the USD reduce the deferred tax liability a significant portion of which was translated at a rate of 1USD:1RTGS$. |
| · | Withholding tax is levied on certain remittances from Zimbabwe i.e. dividend payments from Zimbabwe to the UK and payments of management fees from Blanket to CMSA. |
| 26 |
| 4.11 | Solar project |
As noted in section 4.10, Blanket suffers from unstable grid power and load shedding which results in frequent and prolonged power outages. In late 2019 Caledonia initiated a tender process to identify parties to make proposals for a solar project to reduce Blanket’s reliance on grid power. In 2020, the Caledonia board approved the project and the Company raised $13 million (before commission and expenses) to fund the project through the sale of 597,963 shares at an average price of $21.74 per share. Caledonia’s 12.2 Mwac solar plant was connected to the Blanket grid in November 2022 and was fully commissioned in early February 2023 at a construction cost of $14.2 million. At the date of the approval of this MD&A the plant provides approximately a quarter of Blanket’s total electricity requirement during the day.
In December 2022, the Caledonia board approved a proposal for Caledonia Mining Services (Private) Limited (“CMS”) (which owns the solar plant) to issue bonds up to a value of $12 million in the form of loan notes (the “solar bonds”). The decision was taken to optimise the capital structure of the Group and provide additional debt instruments to the Zimbabwean financial market. The bonds have an interest rate of 9.5% payable bi-annually and have a tenor of 3 years from the date of issue. The bond repayments are guaranteed by the Company and up to the date of this MD&A $7 million of bonds have been issued to Zimbabwean commercial entities by CMS.
Due to the unique operating environment in Zimbabwe and Caledonia’s significant in-country expertise, Caledonia opted to build the solar plant using its own resources rather than relying on an external party to build and own the solar plant using its financial resources and selling the resultant power to Blanket on a long-term contract. Accordingly, Caledonia constructed the solar plant using its own financial resources at a cost of $14.2m. As the solar plant is now fully commissioned and is working as planned, Caledonia no longer needs to own the solar project, provided it retains long term access to the power it produces.
In the second quarter of 2023 management embarked on a process to sell the solar plant. Various offers were received, and a counterparty has been given exclusivity to conduct due diligence and further negotiate the sale of the plant after proving their ability to operate and fund solar plants of similar size and complexity. Management is in an advanced stage of finalising the contractual arrangements to sell the solar plant whereby the new owners will exclusively supply Blanket mine with electricity from the current plant, on a take-or-pay basis. This transaction is expected to realise a profit on Caledonia's investment in the plant and release cash for reinvestment in Caledonia’s core business of gold mining that should yield higher returns to our shareholders.
The solar asset was re-classified as held for sale as at September 30, 2023 in the Interim condensed consolidated financial statements. $7 million of solar bonds that were issued in the previous quarter by CMS will be transferred elsewhere in the Caledonia group prior to the sale of CMS so that Caledonia can maintain and develop the relationship with the Zimbabwean institutional holders of the bonds.
| 4.12 | Opportunities and Outlook |
Production Guidance
Consolidated production guidance for Blanket in 2023 is unchanged at between 75,000 – 80,000 ounces. Production guidance of 12,500 – 17,000 ounces from the Bilboes oxide mine was withdrawn in April 2023.
This is forward looking information as defined by National Instrument 51-102. Refer to section 18 of this MD&A for further information on forward looking statements.
| 27 |
Cost Guidance
The on-mine cost per ounce at Blanket in the Quarter was $817 which is within the guidance range of $770 to $850 per ounce. However, due to the higher cost per ounce incurred in the first 6 months of the year, it is expected that on-mine cost per ounce at Blanket will be in the range of $850 and $920 per ounce for the 12 months of 2023. Management is pursuing initiatives to reduce costs per ounce through more efficient use of electricity and labour. Guidance for cost per ounce at the Bilboes oxide mine was withdrawn in April 2023 when production guidance was also withdrawn.
Guidance for consolidated AISC per ounce was between $1,150 and $1,250 per ounce. AISC is significantly affected by activities at the Bilboes oxide mine in respect of which production and cost guidance has been withdrawn. Accordingly, guidance for AISC is re-stated to exclude production and related production costs at Bilboes oxide mine. AISC excluding bilboes oxides is expected to be in the range of $1,130 to $1,230 per ounce for the 12 months to December 31, 2023.
This is forward looking information as defined by National Instrument 51-102. Refer to section 18 of this MD&A for further information on forward looking statements.
Capital Expenditure
Capital expenditure at Blanket in 2023 is budgeted to be $31.9 million (inclusive of CMSA’s mark-up). Capital expenditure includes:
| · | New TSF (first phase) - $12.7 million; |
| · | Capital development at 30 and 34 levels - $9.8 million; |
| · | Utilities for the Central Shaft infrastructure - $3.3 million; |
| · | Information technology infrastructure - $1 million; |
| · | Electrical engineering - $1.4 million; |
| · | Mill and surface engineering - $2.6 million; and |
| · | Staff housing - $500,000. |
Strategy
The immediate strategic focus is to:
| · | maintain production at Blanket at the targeted range of 75,000 - 80,000 ounces for 2023 and at a similar level in 2024; |
| · | continue deep level drilling at Blanket with the objective of further upgrading inferred mineral resources, thereby extending the life of mine; |
| · | complete the Caledonia feasibility study on the Bilboes sulphide project to determine the best implementation strategy and estimate the funding requirements and commence development of the sulphide project; and |
| · | commence exploration at Motapa. |
| 28 |
| 5 | EXPLORATION |
Caledonia’s exploration activities are focussed on Blanket and Motapa.
Blanket
Encouraging results were received during the Quarter from the ongoing underground drilling program at Blanket which currently targets the Eroica and Blanket ore bodies. Initial results from the drilling at Eroica were announced on July 10, 2023 and indicate that, in general, the Eroica ore body has better grades and widths than expected.
Highlights of the results include:
| Hole Identifier | Orebody Name * | Orebody Intersection | Core Length (m) |
True width (m) |
Gold Grade (g/t) |
Orebody Intersection depth from surface (m) |
End of Hole Depth (m) |
||
| From (m) | To (m) | ||||||||
| ERC750EX2303 | ERCN_HW | 262.7 | 278.3 | 15.6 | 8.6 | 15.56 | 891.4 | 356.3 | |
| ERC750EX2301 | ERCN_HW | 263.8 | 281.2 | 17.4 | 13.44 | 6.62 | 914.9 | 352.2 | |
| ERC750EX2206 | ERCN_HW | 203.9 | 246.5 | 42.6 | 22.32 | 4.03 | 870.3 | 281.3 | |
* ERCN_HW - Eroica North Hanging Wall
The complete drilling results and locations are provided on the Company website: https://polaris.brighterir.com/public/caledonia_mining/news/rns_tool/story/w3j603x.
Craig James Harvey, MGSSA, MAIG, Caledonia Vice President, Technical Services, reviewed and approved the scientific and technical information contained in the announcement of the results. Craig James Harvey is a "Qualified Person" as defined by each of (i) the Canadian Securities Administrators' National Instrument 43-101 - Standards of Disclosure for Mineral Projects and (ii) and the United States Securities and Exchange Commission’s Subpart 1300 of Regulation S-K (“Subpart 1300”).
Drilling continues at the Blanket ore bodies and the results are expected to be published early in 2024.
Motapa
Substantive exploration work at Motapa can commence after an Environmental Impact Assessment (“EIA”) has been approved by the Zimbabwe authorities. An EIA report was submitted in July 2023 and certification was received in August 2023 paving way for exploration work to commence.
The Motapa exploration program entails the exploration of the deeper lying sulphide mineralisation at Motapa and will be achieved through a combination of reverse circulation and diamond drilling. It is planned to commence at a later date still to be determined.
| 29 |
| 6. | INVESTING |
An analysis of investments is set out below.
| ($’000’s) | 2020 | 2021 | 2022 | 2023 | 2023 | 2023 | ||||||||||||||||||
| Year | Year | Year | Q1 | Q2 | Q3 | |||||||||||||||||||
| Property, plant and equipment | ||||||||||||||||||||||||
| Blanket | 24,315 | 29,323 | 34,267 | 2,610 | 5,938 | 8,942 | ||||||||||||||||||
| Solar | 372 | 1,581 | 12,198 | 16 | - | 18 | ||||||||||||||||||
| Other | 91 | 365 | 967 | 485 | 70 | 82 | ||||||||||||||||||
| Total investment – Property, plant and equipment | 24,778 | 31,269 | 47,432 | 3,111 | 6,008 | 9,042 | ||||||||||||||||||
| Exploration and evaluation assets | ||||||||||||||||||||||||
| Bilboes | - | - | - | 73,198 | - | 130 | ||||||||||||||||||
| Connemara North | 300 | 163 | 4 | - | - | - | ||||||||||||||||||
| Glen Hume | 2,661 | 1,176 | - | - | - | - | ||||||||||||||||||
| Maligreen | - | - | 1,430 | 144 | 59 | 12 | ||||||||||||||||||
| Motapa | - | - | 7,844 | - | 81 | 1,628 | ||||||||||||||||||
| Other Satellite properties | 97 | 243 | 120 | - | - | - | ||||||||||||||||||
| Total investment – Exploration and evaluation assets | 3,058 | 1,582 | 9,398 | 73,342 | 140 | 1,770 |
Investment in property, plant and equipment at Blanket is discussed in section 4.7 of this MD&A; investment in exploration and evaluation assets is as set out in section 5.
| 7. | FINANCING |
Operating and investing activities at Blanket in the Quarter were funded by Blanket's operating cashflows and from Blanket’s overdraft facilities which were as set out below at September 30, 2023.
| Overdraft facilities | ||||||
| Lender | Date drawn | Principal value | Balance drawn at September 30, 2023 |
Repayment terms | Security |
Expiry |
| Stanbic Bank Limited | Jan-23 | RTGS$350 million | Nil | On demand | Unsecured | Feb-24 |
| Stanbic Bank Limited | Jan-23 | $4 million | $3.75 million | On demand | Unsecured | Feb-24 |
| CABS Bank | Sept-23 | $2 million | $375,000 | On demand | Unsecured | Jul-24 |
| Ecobank | Nov-22 | $7 million | $4.7 million | On demand | Unsecured | Oct-23 |
| Nedbank | Apr-23 | $7 million | $5.09 million | On demand | Unsecured | Apr-24 |
There were no issues of equity or loan notes in the Quarter.
| 30 |
Hedging
On May 22, 2023 the Company purchased put options to hedge 28,000 ounces of gold from June to December 2023, at a strike price of $1,900 per ounce. The put options were entered into to protect the Company against gold prices lower than the strike price over the period hedged.
On September 29, 2023 and October 6, 2023 the Company purchased two gold purchase options of 1,000 ounces each at a market price of $1,875 and $1,841 per ounce. The gold purchase options were purchased when the gold price was below $1,900 per ounce at the date of gold revenue delivery. This was done to match the expiry date of the call options expiring on October 26, 2023 with the date of the gold sales from Blanket, and resulted in a profit of $0.2 million.
| 8. | LIQUIDITY AND CAPITAL RESOURCES |
An analysis of Caledonia’s capital resources is set out below.
| Liquidity and Capital Resources | ||||||||||||||||||||||||
| ($’000’s) | ||||||||||||||||||||||||
| As at | Jun 30 | Sep 30 | Dec 31 | Mar 31 | Jun 30 | Sep 30 | ||||||||||||||||||
| 2022 | 2022 | 2022 | 2023 | 2023 | 2023 | |||||||||||||||||||
| Net cash and cash equivalents | 10,862 | 6,167 | 1,496 | 3,189 | (2,097 | ) | (3,192 | ) | ||||||||||||||||
| Net working capital | 25,695 | 23,975 | 5,986 | 3,677 | 7,674 | 18,758 | ||||||||||||||||||
Movements in Caledonia’s net cash, overdraft and working capital and an analysis of the sources and uses of Caledonia’s cash are discussed in section 3 of this MD&A. The overdraft and term facilities are held by Blanket with Zimbabwean banks with security and repayment periods are detailed in section 7. The Company’s liquid assets as at September 30, 2023 plus anticipated cashflows exceeded its planned and foreseeable commitments as set out in section 9.
| 9. | OFF-BALANCE SHEET ARRANGEMENTS, CONTRACTUAL COMMITMENTS AND CONTINGENCIES |
There are no off-balance sheet arrangements apart from the facilitation loans of $14 million which are not reflected as loans receivable for IFRS purposes (refer to note 6 of the Interim Financial Statements). The Company had the following contractual obligations at September 30, 2023:
| Payments due by period | ||||||||||||||||||||
| ($’000’s) | ||||||||||||||||||||
| Falling due | Within 1 year | 1-3 Years | 4-5 Years | After 5 Years | Total | |||||||||||||||
| Trade and other payables | 17,459 | - | - | - | 17,459 | |||||||||||||||
| Provisions | - | 947 | 556 | 6,929 | 8,432 | |||||||||||||||
| Capital expenditure commitments | 4,674 | - | - | - | 4,674 | |||||||||||||||
| Lease liabilities | 138 | 93 | - | - | 231 | |||||||||||||||
| Cash-settled share-based payments | 674 | 229 | - | - | 903 | |||||||||||||||
| Loan notes | 665 | 6,390 | - | - | 7,055 | |||||||||||||||
The capital expenditure commitments relate to materials and equipment which have been ordered by CMSA and which will be sold to Blanket.
| 31 |
Other than the proposed investment in the exploration properties, the committed and uncommitted investment will be used to maintain Blanket’s existing operations and implement the final development relating to the Central Shaft and the new TSF as discussed in section 4.7 of this MD&A.
Committed and uncommitted purchase obligations are expected to be met from the cash generated from Blanket’s existing operations and Blanket’s existing borrowing facilities. The Group leases property for its administrative offices in Jersey, Harare and Johannesburg; following the implementation of IFRS 16 the Group recognises the liabilities for these leases. As of September 30, 2023, the Group had liabilities for rehabilitation work on Blanket – if the mine is permanently closed – at an estimated discounted cost of $2.8 million (December 31, 2022: $2.8 million), Motapa’s liability amounted to $1.1 million (December 31, 2022: $0) and Bilboes’ liability amounted to $4.5 million (December 31, 2022: $0 million).
| 10. | NON-IFRS MEASURES |
Throughout this document, we provide measures prepared in accordance with IFRS in addition to some non-IFRS performance measures. As there is no standard method for calculating non-IFRS measures, they are not a reliable way to compare Caledonia against other companies. Non-IFRS measures should be used along with other performance measures prepared in accordance with IFRS. We define below the non-IFRS measures used in this document and reconcile such non-IFRS measures to the IFRS measures we report.
| 10.1 | Cost per ounce |
Non-IFRS performance measures such as “on-mine cost per ounce”, “all-in sustaining cost per ounce” and “all-in cost per ounce” are used in this document. Management believes these measures assist investors and other stakeholders in understanding the economics of gold mining over the life cycle of a mine. These measures are calculated on the basis set out by the World Gold Council in a Guidance Note and accordingly differ from the previous basis of calculation. The table below reconciles non-IFRS cost measures to the production costs shown in the financial statements prepared under IFRS.
| 32 |
| Reconciliation of IFRS Production Cost to Non-IFRS Costs per ounce | ||||||||||||||||||||||||||||||||||||||||||||||||
| ($’000’s, unless otherwise indicated) | ||||||||||||||||||||||||||||||||||||||||||||||||
| Bilboes Oxides | Blanket m | Consolidated | ||||||||||||||||||||||||||||||||||||||||||||||
| 3 months ended Sep 30 | 9 months ended Sep 30 | 3 months ended Sep 30 | 9 months ended Sep 30 | 3 months ended Sep 30 | 9 months ended Sep 30 | |||||||||||||||||||||||||||||||||||||||||||
| 2023 | 2022 | 2023 | 2022 | 2023 | 2022 | 2023 | 2022 | 2023 | 2022 | 2023 | 2022 | |||||||||||||||||||||||||||||||||||||
| Production cost (IFRS) | 3,366 | - | 10,892 | - | 17,086 | 15,802 | 50,136 | 44,663 | 20,452 | 15,802 | 61,028 | 44,663 | ||||||||||||||||||||||||||||||||||||
| COVID-19 labour and consumable expenses | - | - | - | - | - | (81 | ) | - | (245 | ) | - | (81 | ) | - | (245 | ) | ||||||||||||||||||||||||||||||||
| Cash-settled share-based expense | - | - | - | - | (49 | ) | (17 | ) | (435 | ) | (441 | ) | (49 | ) | (17 | ) | (435 | ) | (441 | ) | ||||||||||||||||||||||||||||
| Less exploration and safety costs | - | - | - | - | (302 | ) | (258 | ) | (856 | ) | (748 | ) | (302 | ) | (258 | ) | (856 | ) | (748 | ) | ||||||||||||||||||||||||||||
| On-mine admin costs, employee incentives and intercompany adjustments | - | - | - | - | (2 | ) | 59 | (164 | ) | (583 | ) | (2 | ) | 59 | (164 | ) | (583 | ) | ||||||||||||||||||||||||||||||
| On-mine production cost* | 3,366 | - | 10,892 | - | 16,733 | 15,505 | 48,681 | 42,646 | 20,099 | 15,505 | 59,573 | 42,646 | ||||||||||||||||||||||||||||||||||||
| Gold sales (oz) | 1,163 | - | 2,344 | - | 20,486 | 21,120 | 54,090 | 60,168 | 21,649 | 21,120 | 56,433 | 60,168 | ||||||||||||||||||||||||||||||||||||
| On-mine cost per ounce ($/oz) | 2,895 | - | 4,647 | - | 817 | 734 | 900 | 709 | 928 | 734 | 1,056 | 709 | ||||||||||||||||||||||||||||||||||||
| Royalty | 110 | - | 226 | - | 2,097 | 1,796 | 5,424 | 5,408 | 2,207 | 1,796 | 5,650 | 5,408 | ||||||||||||||||||||||||||||||||||||
| Exploration, remediation and permitting cost | - | - | - | - | 8 | (23 | ) | 38 | 89 | 8 | (23 | ) | 38 | 89 | ||||||||||||||||||||||||||||||||||
| Sustaining capital expenditure# | - | - | - | - | 4,634 | 2,816 | 8,347 | 7,010 | 4,634 | 2,816 | 8,347 | 7,010 | ||||||||||||||||||||||||||||||||||||
| Sustaining administrative expenses& | - | - | - | - | 1,614 | 681 | 4,164 | 1,555 | 1,614 | 681 | 4,164 | 1,555 | ||||||||||||||||||||||||||||||||||||
| 33 |
| Reconciliation of IFRS Production Cost to Non-IFRS Costs per ounce | ||||||||||||||||||||||||||||||||||||||||||||||||
| ($’000’s, unless otherwise indicated) | ||||||||||||||||||||||||||||||||||||||||||||||||
| Bilboes Oxides | Blanket m | Consolidated | ||||||||||||||||||||||||||||||||||||||||||||||
| 3 months ended Sep 30 | 9 months ended Sep 30 | 3 months ended Sep 30 | 9 months ended Sep 30 | 3 months ended Sep 30 | 9 months ended Sep 30 | |||||||||||||||||||||||||||||||||||||||||||
| 2023 | 2022 | 2023 | 2022 | 2023 | 2022 | 2023 | 2022 | 2023 | 2022 | 2023 | 2022 | |||||||||||||||||||||||||||||||||||||
| Silver by-product credit | - | - | - | - | (35 | ) | (26 | ) | (89 | ) | (88 | ) | (35 | ) | (26 | ) | (89 | ) | (88 | ) | ||||||||||||||||||||||||||||
| Cash-settled share-based payment expense included in production cost | - | - | - | - | 49 | 17 | 435 | 441 | 49 | 17 | 435 | 441 | ||||||||||||||||||||||||||||||||||||
| Cash-settled share-based payment expense | - | - | - | - | 27 | 25 | 298 | 335 | 27 | 25 | 298 | 335 | ||||||||||||||||||||||||||||||||||||
| Equity-settled share-based payment expense | - | - | - | - | 233 | 94 | 564 | 176 | 233 | 94 | 564 | 176 | ||||||||||||||||||||||||||||||||||||
| Procurement margin included in on-mine cost* | - | - | - | - | (1,377 | ) | (573 | ) | (3,433 | ) | (1,423 | ) | (1,377 | ) | (573 | ) | (3,433 | ) | (1,423 | ) | ||||||||||||||||||||||||||||
| All-in sustaining cost | 3,476 | - | 11,118 | - | 23,983 | 20,312 | 64,429 | 56,149 | 27,459 | 20,312 | 75,547 | 56,149 | ||||||||||||||||||||||||||||||||||||
| Gold sales (oz) | 1,163 | - | 2,344 | - | 20,486 | 21,120 | 54,090 | 60,168 | 21,649 | 21,120 | 56,433 | 60,168 | ||||||||||||||||||||||||||||||||||||
| AISC per ounce ($/oz) | 2,990 | - | 4,744 | - | 1,171 | 962 | 1,191 | 933 | 1,268 | 962 | 1,339 | 933 | ||||||||||||||||||||||||||||||||||||
| Non-sustaining administrative expenses& | - | - | 2,900 | - | 1,154 | 2,108 | 4,826 | 6,513 | 1,154 | 2,108 | 7,726 | 6,513 | ||||||||||||||||||||||||||||||||||||
| Permitting and exploration expenses | - | - | - | - | 3 | - | 16 | 41 | 3 | - | 22 | 41 | ||||||||||||||||||||||||||||||||||||
| Covid 19 expenses | - | - | - | - | - | 81 | - | 245 | - | 81 | - | 245 | ||||||||||||||||||||||||||||||||||||
| Non-sustaining capital expenditure# | 80 | - | 140 | - | 4,328 | 8,210 | 9,674 | 29,372 | 4,408 | 8,210 | 9,814 | 29,372 |
| 34 |
| Reconciliation of IFRS Production Cost to Non-IFRS Costs per ounce | ||||||||||||||||||||||||||||||||||||||||||||||||
| ($’000’s, unless otherwise indicated) | ||||||||||||||||||||||||||||||||||||||||||||||||
| Bilboes Oxides | Blanket m | Consolidated | ||||||||||||||||||||||||||||||||||||||||||||||
| 3 months ended Sep 30 | 9 months ended Sep 30 | 3 months ended Sep 30 | 9 months ended Sep 30 | 3 months ended Sep 30 | 9 months ended Sep 30 | |||||||||||||||||||||||||||||||||||||||||||
| 2023 | 2022 | 2023 | 2022 | 2023 | 2022 | 2023 | 2022 | 2023 | 2022 | 2023 | 2022 | |||||||||||||||||||||||||||||||||||||
| Total all-in cost | 3,556 | - | 14,158 | - | 29,468 | 30,711 | 78,945 | 92,320 | 33,024 | 30,711 | 93,109 | 92,320 | ||||||||||||||||||||||||||||||||||||
| Gold sales (oz) | 1,163 | - | 2,344 | - | 20,486 | 21,120 | 54,090 | 60,168 | 21,649 | 21,120 | 56,433 | 60,168 | ||||||||||||||||||||||||||||||||||||
| All-in cost per ounce ($/oz) | 3,059 | - | 6,041 | - | 1,438 | 1,454 | 1,460 | 1,534 | 1,525 | 1,454 | 1,650 | 1,534 | ||||||||||||||||||||||||||||||||||||
* The on-mine cost reflects the cost incurred on-mine to produce gold. The procurement margin on consumable sales between CMSA and Blanket is not deducted from on-mine cost as the cost represents a fair value that Blanket would pay for consumables if they were sourced from a third party. The procurement margin on these sales is deducted from all-in sustaining cost and all-in cost as these numbers represent the consolidated costs at a group level, excluding intercompany profit margins.
& Administrative expenses relate to costs incurred by the Group to provide services for mining and related activities. From the last quarter of 2022 administrative expenses have been allocated between AISC and all-in cost. Prior years have been restated in the MD&A.
# Non-sustaining costs are primarily those costs incurred at ‘new operations’ and costs related to ‘major projects at existing operations’ where these projects will materially benefit the operation. All other costs related to existing operations are considered sustaining.
| 35 |
| 10.2 | Average realised gold price per ounce |
The table below reconciles “Average realised gold price per ounce” to the Revenue shown in the financial statements which have been prepared under IFRS.
| Reconciliation of average realised gold price per ounce | ||||||||||||||||
| ($’000’s, unless otherwise indicated) | ||||||||||||||||
| 3 months ended Sep 30 | 9 months ended Sep 30 | |||||||||||||||
| 2023 | 2022 | 2023 | 2022 | |||||||||||||
| Revenue (IFRS) | 41,187 | 35,840 | 107,653 | 107,904 | ||||||||||||
| Revenues from sales of silver | (35 | ) | (26 | ) | (89 | ) | (88 | ) | ||||||||
| Revenues from sales of gold | 41,152 | 35,814 | 107,564 | 107,816 | ||||||||||||
| Gold ounces sold (oz) | 21,649 | 20,091 | 56,433 | 60,168 | ||||||||||||
| Average realised gold price per ounce (US$/oz) | 1,901 | 1,783 | 1,906 | 1,792 | ||||||||||||
| 36 |
| 10.3 | Adjusted earnings per share |
“Adjusted earnings per share” is a non-IFRS measure which management believes assists investors to understand the Company’s underlying performance. The table below reconciles “adjusted earnings per share” to the profit/loss attributable to owners of the Company shown in the financial statements which have been prepared under IFRS. Adjusted earnings per share is calculated by deducting payments to Blanket Employee Trust Services (Private) Limited (“BETS”) (the company that owns 10% of Blanket’s shares on behalf of an employee trust), foreign exchange gains and losses, impairments, deferred tax and inventory write-downs from the profit attributable to the owners of the Company.
| Reconciliation of Adjusted earnings (loss) per share (“Adjusted EPS”) to IFRS Profit attributable to owners of the Company | ||||||||||||||||||||
| ($’000’s, unless otherwise indicated) | ||||||||||||||||||||
| 3 months ended September 30 | 9 months ended September 30 | |||||||||||||||||||
| 2023 | 2022 | 2023 | 2022 | |||||||||||||||||
| Profit for the period (IFRS) | 5,711 | 10,195 | 1,693 | 31,193 | ||||||||||||||||
| Non-controlling interest share of loss for the period | (1,205 | ) | (1,581 | ) | (2,729 | ) | (5,261 | ) | ||||||||||||
| Profit (loss) attributable to owners of the Company | 4,506 | 8,614 | (1,036 | ) | 25,932 | |||||||||||||||
| BETS adjustment | (182 | ) | (122 | ) | (217 | ) | (562 | ) | ||||||||||||
| Earnings (loss) (IFRS) | 4,324 | 8,492 | (1,253 | ) | 25,370 | |||||||||||||||
| Weighted average shares in issue (thousands) | 17,969 | 12,830 | 18,457 | 12,830 | ||||||||||||||||
| IFRS EPS (cents) | 24.1 | 66.2 | (6.8 | ) | 197.7 | |||||||||||||||
| Add back (deduct) amounts in respect of foreign exchange movements | ||||||||||||||||||||
| Realised net foreign exchange losses | (1,249 | ) | 1,385 | 4,811 | 6,088 | |||||||||||||||
| - less tax | 304 | (341 | ) | (1,188 | ) | (1,502 | ) | |||||||||||||
| - less non-controlling interest | 122 | (138 | ) | (478 | ) | (604 | ) | |||||||||||||
| Unrealised net foreign exchange gains | 1,506 | (2,944 | ) | (2,477 | ) | (12,728 | ) | |||||||||||||
| - less tax | (403 | ) | 568 | 378 | 2,955 | |||||||||||||||
| - less non-controlling interest | (157 | ) | 265 | 173 | 1,245 | |||||||||||||||
| Adjusted IFRS profit excl. foreign exchange | 4,447 | 7,287 | (34 | ) | 20,824 | |||||||||||||||
| Weighted average shares in issue (thousands) | 17,969 | 12,830 | 18,457 | 12,830 | ||||||||||||||||
| Adjusted IFRS EPS excl. foreign exchange (cents) | 24.7 | 56.8 | (0.2 | ) | 162.3 | |||||||||||||||
| Add back (deduct) amounts in respect of: | ||||||||||||||||||||
| Reversal of BETS adjustment | - | 182 | 122 | 217 | 562 | |||||||||||||||
| Impairment of property, plant and equipment | 26 | 184 | 877 | 197 | ||||||||||||||||
| Deferred tax | 1,335 | 844 | 1,411 | 301 | ||||||||||||||||
| Non-controlling interest portion of deferred tax and impairment | (153 | ) | (114 | ) | (249 | ) | (105 | ) | ||||||||||||
| Fair value losses on derivative financial instruments | 102 | (537 | ) | 590 | 1,160 | |||||||||||||||
| Adjusted profit | 5,939 | 7,786 | 2,812 | 22,939 | ||||||||||||||||
| Weighted average shares in issue (thousands) | 17,969 | 12,830 | 18,457 | 12,830 | ||||||||||||||||
| Adjusted EPS (cents) | 33.0 | 60.7 | 15.2 | 178.8 | ||||||||||||||||
| 37 |
| 11. | RELATED PARTY TRANSACTIONS |
Key management personnel are persons responsible for planning, directing and controlling the activities of an entity, and include directors and executive officers of the Company. The amounts paid by the Company for the services provided by key management personnel who are related parties have been determined by negotiation among the parties and are reviewed and approved by the Company’s board. These transactions are in the normal course of operation.
The Company has entered into a consultancy agreement with Steve Curtis, a director of the Company and the former Chief Executive Officer, effective July 1, 2022 to December 31, 2023 with a monthly fee of US$44,100 for the period July 1, 2022 until December 31, 2022 and US$12,500 for the period January 1, 2023 until December 31, 2023. During the Quarter, the Company expensed US$37,500 (2022: US$ $132,300 in advisory service fees.
| 12. | CRITICAL ACCOUNTING ESTIMATES |
Caledonia's accounting policies are set out in the Interim Financial Statements which have been publicly filed on SEDAR. In preparing the Interim Financial Statements, management is required to make estimates and assumptions that affect the amounts represented in the Interim Financial Statements and related disclosures. Use of available information and the application of judgement are inherent in the formation of estimates. Estimates and underlying assumptions are reviewed on an on-going basis. Revisions to accounting estimates are recognised in the period in which the estimates are revised and in any future periods affected. Discussion of recently issued accounting pronouncements is set out in note 4 of the Interim Financial Statements. Information about critical judgements in applying accounting policies that have the most significant effect on the amounts recognised in the Interim Financial Statements is included in the following notes:
| i) | Indigenisation transaction |
The directors of Caledonia Holdings Zimbabwe (Private) Limited (“CHZ”), a wholly owned subsidiary of the Company, performed an assessment, using the requirements of IFRS 10: Unaudited Condensed Consolidated Interim Financial Statements (IFRS 10), and concluded that CHZ should continue to consolidate Blanket and accounted for the transaction as follows:
| · | Non-controlling interests (“NCI”) are recognised on the portion of shareholding upon which dividends declared by Blanket accrue unconditionally to equity holders as follows: |
| (a) | 20% of the 16% shareholding of National Indigenisation and Economic Empowerment Fund (“NIEEF”); and |
| (b) | 100% of the 10% shareholding of GCSOT. |
| · | This effectively means that NCI is recognised at Blanket at 13.2% of its net assets. |
| · | The remaining 80% of the shareholding of NIEEF is recognised as a non-controlling interest to the extent that its attributable share of the net asset value of Blanket exceeds the balance on the facilitation loans including interest. At September 30, 2023 the attributable net asset value did not exceed the balance on the loan account and thus no additional NCI was recognised. |
The transaction with Blanket Employee Trust Services (Private) Limited (“BETS”) is accounted for in accordance with IAS 19 Employee Benefits (profit sharing arrangement) as the ownership of the shares does not ultimately pass to the employees. The employees are entitled to participate in 20% of the dividends accruing to the 10% shareholding in Blanket if they are employed at the date of such distribution. To the extent that 80% of the attributable dividends exceeds the balance on BETS’ facilitation loan they will accrue to the employees at the date of such declaration.
The Employee Trust, which owns BETS, and BETS, are structured entities which are effectively controlled and consolidated by Blanket. Accordingly, the shares held by BETS are effectively treated as treasury shares in Blanket and no NCI is recognised.
| 38 |
| ii) | Site restoration provisions |
The site restoration provision has been calculated for Blanket based on an independent analysis of the rehabilitation costs performed in 2021. Estimates and assumptions are made when determining the inflationary effect on current restoration costs and the discount rate to be applied in arriving at the present value of the provision. Assumptions, based on the current economic environment, have been made which management believes are a reasonable basis upon which to estimate the future liability. These estimates take account of any material changes to the assumptions that occur when reviewed by management. Estimates are reviewed annually and are based on current regulatory requirements. Significant changes in estimates of contamination, restoration standards and techniques will result in changes to provisions from period to period. Actual rehabilitation costs will ultimately depend on future market prices for the rehabilitation costs which will reflect the market condition at the time the rehabilitation costs are incurred. The final cost of the currently recognized site rehabilitation provisions may be higher or lower than currently provided for.
| iii) | Exploration and evaluation (“E&E”) expenditure |
Exploration and evaluation assets are tested for impairment before the assets are transferred to mine development, infrastructure and other assets or when an indicator of impairment is identified. Exploration and evaluations assets are not depreciated.
The Group also makes assumptions and estimates regarding the technical feasibility and commercial viability of the mineral project and the possible impairment of E&E assets by evaluating whether it is likely that future economic benefits will flow to the Group, which may be based on assumptions about future events or circumstances e.g., such as the completion of a feasibility study indicating construction, funding and economic returns that are sufficient. Assumptions and estimates made may change if new information becomes available. If information becomes available suggesting that the recovery of expenditures is unlikely, the amount capitalised is written off in profit or loss in the period the new information becomes available. The recoverability of the carrying amount of exploration and evaluation assets depends on the availability of sufficient funding to bring the properties into commercial production, the price of the products to be recovered and the undertaking of profitable mining operations. As a result of these uncertainties, the actual amount recovered may vary significantly from the carrying amount.
| iv) | Income taxes |
Significant estimates and assumptions are required in determining the provision for income taxes. There are many transactions and calculations undertaken during the ordinary course of business for which the ultimate tax determination is uncertain. Caledonia records its best estimate of the tax liability including any related interest and penalties in the current tax provision. In addition, Caledonia applies judgement in recognizing deferred tax assets relating to tax losses carried forward to the extent that there are sufficient taxable temporary differences (deferred tax liabilities) relating to the same taxation authority and the same taxable entity against which the unused tax losses can be utilized or sufficient estimated taxable income against which the losses can be utilized.
| v) | Share-based payment transactions |
The fair value of the amount payable to employees in respect of share-based awards, which are settled in cash, is recognised as an expense with a corresponding increase in liabilities, over the period over which the employee becomes unconditionally entitled to payment. The liability is re-measured at each reporting date. Any changes in the fair value of the liability are recognised as a personnel expense in profit or loss. Additional information about significant judgements and estimates and the assumptions used to estimate fair value for cash settled share-based payment transactions are disclosed in note 10 to the Interim Financial Statements.
| 39 |
| vi) | Impairment |
At each reporting date, Caledonia determines if impairment indicators exist and, if present, performs an impairment review of the non-financial assets held in Caledonia. The exercise is subject to various judgemental decisions and estimates. Financial assets are also reviewed regularly for impairment.
| vii) | Depreciation |
Depreciation on mine development, infrastructure and other assets in the production phase is computed on the units-of-production method over the life-of-mine based on the estimated quantities of reserves (proven and probable) and resources (measured, indicated and inferred), which are planned to be extracted in the future from known mineral deposits. Where items have a shorter useful life than the life-of-mine, the mine development, infrastructure and other assets are depreciated over their useful life. Confidence in the existence, commercial viability and economical recovery of reserves and resources included in the life-of-mine plan may be based on historical experience and available geological information. This is in addition to the drilling results obtained by the Group and management’s knowledge of the geological setting of the surrounding areas, which would enable simulations and extrapolations to be done with a sufficient degree of accuracy. In instances where management can demonstrate the economic recovery of resources with a high level of confidence, such additional resources are included in the calculation of depreciation.
| viii) | Mineral reserves and resources |
Mineral reserves and resources are estimates of the amount of product that can be economically and legally extracted. In order to calculate the reserves and resources, estimates and assumptions are required about a range of geological, technical and economic factors, including but not limited to quantities, grades, production techniques, recovery rates, production costs, transport costs, commodity prices and exchange rates. Estimating the quantity and grade of mineral reserves and resources requires the size, shape and depth of orebodies to be determined by analysing geological data such as the logging and assaying of drill samples. This process may require complex and difficult geological assumptions and calculations to interpret the data. Estimates of mineral reserves and resources may change due to the change in economic assumptions used to estimate mineral reserves and resources and due to additional geological data becoming available during operations.
The Group estimates its mineral reserves (proven and probable) and mineral resources (measured, indicated and inferred) based on information compiled by a Qualified Person principally in terms of Canadian Securities Administrators' National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”) and the United States Securities and Exchange Commission’s Subpart 1300 of Regulation S-K (“Subpart 1300”) relating to geological and technical data of the size, depth, shape and grade of the ore body and suitable production techniques and recovery rates. Such an analysis requires geological and engineering assumptions to interpret the data. These assumptions include:
| · | correlation between drill-hole intersections where multiple reefs are intersected. |
| · | continuity of mineralisation between drill-hole intersections within recognised reefs; and |
| · | appropriateness of the planned mining methods. |
The Group estimates and reports reserves and resources principally in accordance with Subpart 1300 and NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum (the “CIM”) - CIM Definition Standards for Mineral Resources and Mineral Reserves. Complying with the CIM code, NI 43-101 requires the use of reasonable assumptions to calculate the recoverable resources. These assumptions include:
| · | the gold price based on current market price and the Group’s assessment of future prices; |
| · | estimated future on-mine costs, sustaining and non-sustaining capital expenditures; |
| · | cut-off grade; |
| · | dimensions and extent, determined both from drilling and mine development, of ore bodies; and |
| · | planned future production from measured, indicated and inferred resources. |
| 40 |
Changes in reported mineral reserves and mineral resources may affect the Group’s financial results and position in several ways, including the following:
| · | asset carrying values may be affected due to changes in the estimated cash flows; |
| · | depreciation and amortisation charges to profit or loss may change as these are calculated on the unit-of-production method or where useful lives of an asset change; and |
| · | decommissioning, site restoration and environmental provisions may change in ore reserves and resources which may affect expectations about the timing or cost of these activities. |
| 13. | FINANCIAL INSTRUMENTS |
| i) | Commodity risk |
On May 22, 2023 the Company purchased put options to hedge 28,000 ounces of gold from June to December 2023, at a strike price of $1,900 per ounce. At Quarter end these put options were the only hedging option instruments that had not expired. The put options were entered into to protect the Company against gold prices lower than the strike price over the period hedged.
| ii) | Credit risk |
The carrying amount of financial assets as disclosed in the statements of financial position and related notes represents the maximum credit exposure. The trade receivable predominantly relates to gold bullion sold before the end of the Quarter and VAT receivables. The amount due in respect of bullion sales was settled at the date of the MD&A. As discussed in section 4.10, before the end of the Quarter the Company commenced the export and sale of gold to an independent gold refiner outside Zimbabwe, which makes payment for the gold received directly into Caledonia's bank accounts in Zimbabwe. This mechanism means that the Company is no longer exposed to credit risk from FGR in respect of the US Dollar component of its sales.
| iii) | Impairment losses |
None of the trade and other receivables is past due at the period-end date other than a portion of the RTGS$ component of the VAT receivable. Management continues its efforts to recover the RTGS$ component of the VAT receivable either by cash payment and/or offset against other tax amounts payable by Blanket.
| iv) | Liquidity risk |
All trade payables and the bank overdrafts have maturity dates that are expected to mature in under 9 months from approval date of this MD&A. The term loans are repayable as set out in section 7.
| v) | Currency risk |
A proportion of Caledonia’s assets, financial instruments and transactions are denominated in currencies other than the US Dollar. The financial results and financial position of Caledonia are reported in US Dollars in the Interim Financial Statements.
The fluctuation of the US Dollar in relation to other currencies will consequently have an impact upon the profitability of Caledonia and may also affect the value of Caledonia’s assets and liabilities and the amount of shareholders’ equity.
As discussed in section 4.10 of this MD&A, the RTGS$ is subject to variations in the exchange rate against the US Dollar. This may result in Blanket’s assets, liabilities and transactions that are denominated in RTGS$ being subject to further fluctuations in the exchange rate between RTGS$ and US Dollars. In addition, the Company may be subject to fluctuations in the exchange rate between the South African Rand and the US Dollar in respect of cash that is held in Rands in South Africa.
| 41 |
| vi) | Interest rate risk |
Interest rate risk is the risk borne by an interest-bearing asset or liability due to fluctuations in interest rates. Unless otherwise noted, it is the opinion of management that Caledonia is not exposed to significant interest rate risk as it has limited debt financing. Caledonia’s cash and cash equivalents include highly liquid investments that earn interest at market rates. Caledonia’s policy focuses on preservation of capital and limits the investing of excess funds to liquid term deposits in high credit quality financial institutions.
| 14. | DIVIDEND HISTORY |
| Declaration date | cents per share |
| January 3, 2020 | 7.5 |
| April 29, 2020 | 7.5 |
| June 29, 2020 | 8.5 |
| October 1, 2020 | 10.0 |
| January 4, 2021 | 11.0 |
| April 6, 2021 | 12.0 |
| July 6, 2021 | 13.0 |
| October 4, 2021 | 14.0 |
| January 4, 2022 | 14.0 |
| April 7, 2022 | 14.0 |
| July 5, 2022 | 14.0 |
| October 3, 2022 | 14.0 |
| December 30, 2022 | 14.0 |
| April 3, 2023 | 14.0 |
| July 3, 2023 | 14.0 |
| October 2, 2023 | 14.0 |
The board will consider the continuation of the dividend and any future increases in the dividend as appropriate in line with other investment opportunities and its prudent approach to risk management including Blanket maintaining a reasonable level of production; receiving payment in full and on-time for all gold sales; being able to make the necessary local and international payments and being able to replenish its supplies of consumables and other items.
| 15. | MANAGEMENT AND BOARD |
There were no changes to management or the board during the period under review.
| 42 |
| 16. | SECURITIES OUTSTANDING |
At November 8, 2023, being the last day practicable prior to the publication of this MD&A, Caledonia had 19,188,073 common shares issued and the following outstanding options to purchase common shares (“Options”) granted in equal amounts to each of the employees of a PR consultant to the Company 3PPB LLC being P Chidley and P Durham:
| Number of Options | Exercise Price | Expiry Date |
| 10,000 | CAD11.50 | 25-Aug-24 |
| 10,000 | USD 9.49 | 30-Sep-29 |
| 20,000 |
The OEICP allows that the number of shares reserved for issuance to participants under the OEICP, together with shares reserved for issue under any other share compensation arrangements of the Company, shall not exceed the number which represents 10% of the issued and outstanding shares from time to time.
| 17. | RISK ANALYSIS |
The business of Caledonia contains significant risk due to the nature of mining, exploration and development activities. Caledonia’s business contains significant additional risks due to the jurisdictions in which it operates and the nature of mining, exploration and development. Included in the risk factors below are details of how management seeks to mitigate the risks where this is possible.
| · | Liquidity risk: Caledonia currently has sufficient cash and operating resources, access to funding and continues to generate sufficient cash to cover all its anticipated investment needs. |
| · | Availability of foreign currency: The Company needs access to foreign currency in Zimbabwe so that it can pay for imported goods and equipment and remit funds to Group companies outside Zimbabwe. At prevailing gold prices and the current rate of production the Company has access to sufficient foreign currency to continue normal mining operations and to fully implement its investment plan as scheduled. No assurance can be given that sufficient foreign currency will continue to be available. |
| · | Exploration risk: The Company needs to identify new resources to replace ore which has been depleted by mining activities and to commence new projects. No assurance can be given that exploration will be successful in identifying sufficient mineral resources of an adequate grade and suitable metallurgical characteristics that are suitable for further development or production. |
| · | Development risk: The Company is engaged in the implementation of the Central Shaft project as set out in section 4.7 of this MD&A, as well as other projects including in particular Bilboes. Construction and development of projects are subject to numerous risks including: obtaining equipment, permits and services; changes in regulations; currency rate changes; labour shortages; fluctuations in metal prices and the loss of community support. There can be no assurance that construction will commence or continue in accordance with the current expectations or at all. |
| · | Production estimates: Estimates for future production are based on mining plans and are subject to change. Production estimates are subject to risk and no assurance can be given that future production estimates will be achieved. Actual production may vary from estimated production for a variety of reasons including un-anticipated variations in grades, mined tonnages and geological conditions, accident and equipment breakdown, changes in metal prices and the cost and supply of inputs and changes to government regulations. |
| · | Mineral rights: The Company’s existing mining lease, claims, licences, and permits are in good standing. The Company must pay fees etc. to maintain its lease, claims and licences. The Company may not make payments by the required date or meet development and production schedules that are required to protect its lease, claims and licences. |
| 43 |
| · | Metal prices: The Company’s operations and exploration and development projects are heavily influenced by the price of gold, which is particularly subject to fluctuation. The Company had a hedging arrangement in place for a portion of production for the period from December 2022 to May 2023, which has expired, and a subsequent arrangement for the period from May 2023 to December 2023. Management regularly reviews future cash flow forecasts in the context of the prevailing gold price and likely downside scenarios for future gold prices. |
| · | Increasing input costs: Mining companies generally have experienced higher costs of steel, reagents, labour and electricity and from local and national government for levies, fees, royalties and other direct and indirect taxes. |
| · | Illegal mining: In previous years there were incidences of illegal mining activities on properties controlled by Blanket which resulted in increased security costs and an increased risk of theft and damage to equipment. Blanket has received adequate support and assistance from the Zimbabwean police in investigating such cases. Those properties most at risk from such activity had been sold. With new mining areas having been acquired by the Group the incidence and possibility of illegal mining has increased, and there have been minor instances of illegal mining at Bilboes and Motapa. The Group is receiving adequate support and assistance from the Zimbabwean police. |
| · | Electricity supply: Zimbabwe produces and imports less electricity than it requires and has insufficient funds to adequately maintain or upgrade its distribution infrastructure. This has resulted in frequent interruptions to the power supply at Blanket. Blanket has addressed the issue of interrupted power supply by installing stand-by generators and constructing a solar plant which provides approximately a quarter of Blanket’s power requirements during the day. After the end of the Quarter, Blanket entered into an agreement for the direct import of power through the IEUG initiative. Production at Blanket has also been adversely affected by the instability of the incoming electricity supply. The Company has installed further auto-tap changers to increase the protection against power surges and it has further increased its diesel generating capacity. |
| · | Water supply: Blanket uses water in the metallurgical process, most of which is obtained from a nearby dam. Blanket is situated in a semi-arid area and rainfall typically occurs only in the period November to February. The most recent rainy season has been better than average, and management believes there is enough water in the Blanket dam to maintain normal operations until the next rainy season. |
| · | Succession planning: The limited availability of mining and other technical skills and experience in Zimbabwe and the difficulty of attracting appropriately skilled employees to Zimbabwe creates a risk that appropriate skills may not be available if, for whatever reason, the current skills base at Blanket is depleted. The Caledonia and Blanket management teams have been augmented so that, if required, it could provide appropriate support to Blanket if this is required. |
| · | Zimbabwe Country risk: The commercial environment in which the Company operates is unpredictable. Potential risks may arise from: unforeseen changes in the legal and regulatory framework which means that laws may change, may not be enforced, or judgements may not be upheld; restrictions on the movement of currency and the availability of foreign currency at a realistic exchange rate to make payments from Zimbabwe; risks relating to possible corruption, bribery, civil disorder, expropriation or nationalisation; risks relating to restrictions on access to assets and the risk that the Zimbabwe Government is unable to pay its liabilities to Blanket. Management believes that it has minimised such risks by complying fully with all relevant legislation, by obtaining all relevant regulatory permissions and approvals and by regular and proactive engagement with the relevant authorities. |
| · | Gold marketing arrangements: In terms of regulations introduced by the Zimbabwean Ministry of Finance in January 2014, all gold produced in Zimbabwe must be sold to FGR, a company which is owned by the RBZ. In 2021, the Ministry of Finance announced a modification to the regulations that allow gold producers who are listed on the VFEX to export their incremental gold production. The Company has clarified the mechanism whereby this revised policy may be effected and the first shipments and direct sale of gold in terms of these mechanisms was successfully completed in April 2023. |
| 44 |
| · | Other gold industry risks: On June 27, 2023 the U.S. Department of State together with other U.S. government agencies issued an advisory in light of reports related to the role of illicit actors in the gold trade to (i) highlight the opportunities and specific risks raised by the gold trade across sub-Saharan Africa and (ii) encourage industry participants to adopt and apply strengthened due diligence practices to ensure that such malign actors are unable to exploit and benefit from the sector, which remains essential to the livelihoods of millions of people across sub-Saharan Africa. Caledonia acknowledges and concurs with the U.S. Department of States’ warning that without adequate due diligence and appropriate mitigating measures, an industry participant may inadvertently contribute to one or more of these risks, including conflict and terror financing, money laundering activities, sanctions evasion, human rights and labour rights abuses and environmental degradation. Caledonia has robust policies in place to counter such risks including, amongst other things: a Code of Business Conduct, Ethics and Anti-Bribery Policy, a Human Rights Policy and Customer AML/KYC Policy, and it encourages whistleblowing and grievance reporting in order to monitor compliance. Caledonia performs enhanced due diligence on significant suppliers and other counterparties (including, but not limited to, sanctions and political exposure checks), has established new and robust routes to market for its gold production (none of which, for the avoidance of doubt, is artisanal) and has scrutinised the new refineries to which it now sells its gold. The Company reports its environmental, social and governance (“ESG”) performance annually, disclosing key environmental data, supports artisanal miners in the form of tributing of gold claims (as well as the local community generally) and has adopted best practice in the construction of its new TSF. For more information in all of these areas, please refer to Caledonia’s ESG reports. |
| · | South Africa: the company has approximately 20 employees located in South Africa who provide technical and procurement services to Blanket; the group accounting function is also based in Johannesburg and a significant proportion of the consumables, capital equipment and specialist technical services that Blanket requires are procured in South Africa. South Africa will hold presidential, national and local elections in 2024 which may give rise to disruption to normal commercial activity. Management is exploring mechanisms to reduce this exposure for example by developing alternative procurement and logistics routes. |
| 18. | FORWARD LOOKING STATEMENTS |
Information and statements contained in this MD&A that are not historical facts are “forward-looking information” within the meaning of applicable securities legislation that involve risks and uncertainties relating, but not limited to, Caledonia’s current expectations, intentions, plans, and beliefs. Forward-looking information can often be identified by forward-looking words such as “anticipate”, “believe”, “expect”, “goal”, “plan”, “target”, “intend”, “estimate”, “could”, “should”, “may” and “will” or the negative of these terms or similar words suggesting future outcomes, or other expectations, beliefs, plans, objectives, assumptions, intentions or statements about future events or performance. Examples of forward-looking information in this MD&A include: implementation schedules for, and other uncertainties inherent in, the Central Shaft project; production guidance; estimates of future/targeted production rates; planned mill capacity increases; estimates of future metallurgical recovery rates and the ability to maintain high metallurgical recovery rates; timing of commencement of operations; plans and timing regarding further exploration, drilling and development; the prospective nature of exploration and development targets; the ability to upgrade and convert mineral resources to mineral reserves; capital and operating costs; our intentions with respect to financial position and third party financing; and future dividend payments. This forward-looking information is based, in part, on assumptions and factors that may change or prove to be incorrect, thus causing actual results, performance or achievements to be materially different from those expressed or implied by forward-looking information. Such factors and assumptions include, but are not limited to: failure to establish estimated resources and reserves, the grade and recovery of ore which is mined varying from estimates, success of future exploration and drilling programs, reliability of drilling, sampling and assay data, assumptions regarding the representativeness of mineralisation being inaccurate, success of planned metallurgical test-work, capital and operating costs varying significantly from estimates, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, changes in government regulations, legislation and rates of taxation, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects and other factors.
| 45 |
Security holders, potential security holders and prospective investors should be aware that these statements are subject to known and unknown risks, uncertainties and other factors that could cause actual results to differ materially from those suggested by the forward-looking statements. Such factors include, but are not limited to: risks relating to estimates of mineral reserves and mineral resources proving to be inaccurate, fluctuations in gold price and payment terms for gold sold to FGR, risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, industrial accidents, unusual or unexpected geological or structural formations, pressures, power outages, fire, explosions, landslides, cave-ins and flooding), risks relating to the credit worthiness or financial condition of suppliers, refiners and other parties with whom the Company does business, inadequate insurance, or inability to obtain insurance, to cover these risks and hazards, employee relations, relationships with and claims by local communities and indigenous populations, political risk, risks related to natural disasters, terrorism, civil unrest, public health concerns (including health epidemics or outbreaks of communicable diseases such as the coronavirus (COVID-19)), availability and increasing costs associated with mining inputs and labour, the speculative nature of mineral exploration and development, including the risks of obtaining or maintaining necessary licenses and permits, diminishing quantities or grades of mineral reserves as mining occurs, global financial condition, the actual results of current exploration activities, changes to conclusions of economic evaluations, and changes in project parametres to deal with un-anticipated economic or other factors, risks of increased capital and operating costs, environmental, safety or regulatory risks, expropriation, the Company’s title to properties including ownership thereof, increased competition in the mining industry for properties, equipment, qualified personnel and their costs, risks relating to the uncertainty of timing of events including targeted production rate increase and currency fluctuations. Security holders, potential security holders and prospective investors are cautioned not to place undue reliance on forward-looking information. By its nature, forward-looking information involves numerous assumptions, inherent risks and uncertainties, both general and specific, that contribute to the possibility that the predictions, forecasts, projections and various future events will not occur. Caledonia reviews forward-looking information for the purposes of preparing each MD&A; however, Caledonia undertakes no obligation to update publicly or otherwise revise any forward-looking information whether as a result of new information, future events or other such factors which affect this information, except as required by law.
| 19. | CONTROLS |
The Company has established and maintains disclosure controls and procedures (“DC&P”) designed to provide reasonable assurance that material information relating to the Company is made known to the Chief Executive Officer and the Chief Financial Officer by others, particularly during the period in which annual filings are being prepared, and that information required to be disclosed in the Company’s annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified by such securities legislation.
The Company’s management, along with the participation of the Chief Executive Officer and the Chief Financial Officer, have evaluated the effectiveness of the Company’s DC&P as of September 30, 2023. Based on that evaluation, the Chief Executive Officer and the Chief Financial Officer have concluded that, at September 30, 2023, the Company’s DC&P were effective.
The Company also maintains a system of internal controls over financial reporting (“ICFR”) designed under the supervision of the Company’s Chief Executive Officer and Chief Financial Officer to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with IFRS; however, due to inherent limitations, ICFR may not prevent or detect all misstatements and fraud. The board of directors approves the financial statements and ensures that management discharges its financial responsibilities. The Audit Committee, which is composed of independent directors, meets periodically with management and auditors to review financial reporting and control matters and reviews the financial statements and recommends them for approval to the board of directors.
| 46 |
The Company’s management, including the Chief Executive Officer and the Chief Financial Officer, is responsible for establishing and maintaining adequate ICFR and evaluating the effectiveness of the Company’s ICFR as at each fiscal year end. Management has used the 2013 Internal Control–Integrated Framework from the Committee of Sponsoring Organizations of the Treadway Commission (the “COSO”) to evaluate the effectiveness of the Company’s ICFR at September 30, 2023. Based on this evaluation, the Chief Executive Officer and the Chief Financial Officer have concluded that at September 30, 2023, the Company’s ICFR was effective.
There have been no changes in the Company’s ICFR during the period ended September 30, 2023 that have materially affected, or are reasonably likely to materially affect, the Company’s ICFR.
| 20. | QUALIFIED PERSON |
Mr. Dana Roets (B Eng (Min), MBA, Pr. Eng, FSAIMM, AMMSA) is the Company’s qualified person as defined by Subpart 1300 and NI 43-101. Mr. Roets is responsible for the technical information provided in this MD&A except where otherwise stated. Mr. Roets has reviewed the scientific and technical information included in this document and has approved the disclosure of this information for the purposes of this MD&A.
47
Exhibit 99.3
Form 52-109F2
Certification of Interim Filings
Full Certificate
I, John Mark Learmonth, Chief Executive Officer of Caledonia Mining Corporation Plc, certify the following:
| 1. | Review: I have reviewed the interim financial report and interim MD&A (together, the “interim filings”) of Caledonia Mining Corporation (the “issuer”) for the quarter ended September 30, 2023. |
| 2. | No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings. |
| 3. | Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings. |
| 4. | Responsibility: The issuer’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers’ Annual and Interim Filings, for the issuer. |
| 5. | Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer’s other certifying officer and I have, as at the end of the period covered by the interim filings |
| (a) | designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that |
| (i) | material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and |
| (ii) | information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and |
| (b) | designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP. |
| 5.1 | Control framework: The control framework the issuer’s other certifying officer and I used to design the issuer’s ICFR is the Internal Control – Integrated Framework – published by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). |
| 1 |
| 5.2 | N/A |
| 5.3 | N/A |
| 6. | Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer’s ICFR that occurred during the period beginning on January 1, 2023 and ended on September 30, 2023 that has materially affected, or is reasonably likely to materially affect, the issuer’s ICFR. |
Date: November 14, 2023
“John Mark Learmonth”
_______________________
John Mark Learmonth
Chief Executive Officer
2
Exhibit 99.4
Form 52-109F2
Certification of Interim Filings
Full Certificate
I, Chester Goodburn, Chief Financial Officer of Caledonia Mining Corporation Plc, certify the following:
| 1. | Review: I have reviewed the interim financial report and interim MD&A (together, the “interim filings”) of Caledonia Mining Corporation (the “issuer”) for the quarter ended September 30, 2023. |
| 2. | No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings. |
| 3. | Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings. |
| 4. | Responsibility: The issuer’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers’ Annual and Interim Filings, for the issuer. |
| 5. | Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer’s other certifying officer and I have, as at the end of the period covered by the interim filings |
| (a) | designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that |
| (i) | material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and |
| (ii) | information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and |
| (b) | designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP. |
| 5.1 | Control framework: The control framework the issuer’s other certifying officer and I used to design the issuer’s ICFR is the Internal Control – Integrated Framework – published by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). |
| 1 |
| 5.2 | N/A |
| 5.3 | N/A |
| 6. | Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer’s ICFR that occurred during the period beginning on January 1, 2023 and ended on September 30, 2023 that has materially affected, or is reasonably likely to materially affect, the issuer’s ICFR. |
Date: November 14, 2023
“Chester Goodburn”
_______________________
Chester Goodburn
Chief Financial Officer
2