Skip to main content
IMO $136.23 +0.92%
IMO logo
IMO · Imperial Oil Ltd
Track IMO — free
$136.23 +1.24 (+0.92%)
Market Cap
$65.28B
Shares
483.59M
Volume · Oct 21 274.74K Avg daily vol (3M) 566.84K
All webcasts

Earnings call · FY2024 Q1

Imperial Oil Ltd (IMO) Q1 2024 Earnings Call Transcript

Concluded Apr 26, 2024
Apr 26, 2024 44 turns
Period
FY2024 Q1
Runtime
—
Sources
3 artifacts
Revenue 12.28B CAD +1.3% YoY
Net income 1.20B CAD -4.2% YoY
Open full screen 8-K 10-Q

Read the call

Transcript

Read the speaker-labelled prepared remarks and analyst questions.

Operator

Good day, and welcome to the Imperial Oil First Quarter 2024 Earnings Call. Today's conference is being recorded. At this time, I would like to turn the conference over to Peter Shaw, Vice President, Investor Relations. Please go ahead, sir.

Peter Shaw Head of Investor Relations

Good morning, everybody. Welcome to our first quarter earnings conference call. I'm joined this morning by Imperial's senior management team including Brad Corson, Chairman, President and CEO; Dan Lyons, Senior Vice President, Finance and Administration; Sherri Evers, Senior Vice President of Sustainability, Commercial Development & Product Solutions; and Simon Younger, Senior Vice President of the Upstream. Today's comments include reference to non-GAAP financial measures. The definitions and reconciliations of these measures can be found in Attachment 6 of our most recent press release, and are available on our website with a link to this conference call. Today's comments may also contain forward-looking information. Any forward-looking information is not a guarantee of future performance, and actual future performance and operating results can vary materially, depending on a number of factors and assumptions. Forward-looking information and the risk factors and assumptions are described in further detail on our first quarter earnings release that we issued this morning, as well as our most recent Form 10-K. All of these documents are available on SEDAR+, EDGAR, and on our website. So I’d ask you to refer to those. Brad is going to start this morning with some opening remarks and then hand it over to Dan, who is going to provide a financial update, and then Brad will provide an operations update. Once that is done, we will follow with a Q&A session. So with that, I will turn it over to Brad for his opening remarks.

Brad Corson Chairman

Thank you, Peter. Good morning, everybody and welcome to our first quarter earnings call. I hope everyone's doing well and the year is off to a good start for you. Today, I'm very pleased to report that we've sustained the strong operating momentum from the past several quarters, and the organization has delivered another very strong quarter to start 2024. Kearl had a fantastic quarter and delivered more records with the highest first-quarter production in the asset's history. And Cold Lake is getting very close to first production from Grand Rapids Phase I, which as you may recall, is the first deployment of solvent-assisted SAGD technology in the industry, and we're very excited about that. Our downstream and chemicals businesses also ran well over the quarter and contributed very solid earnings. Overall, we feel really good about the strong start to the year. We are well positioned to meet our guidance for the year and continue delivering significant value to our shareholders by returning surplus cash through our reliable and growing dividend and industry-leading share repurchase programs. Over the next few minutes, Dan and I will detail the results of this very strong quarter. Earnings for the quarter were $1,195 million, with cash from operating activities of $1,521 million when excluding the impact of working capital. From an earnings perspective, this represents the second-best first quarter in the company's history. Throughout the quarter, the commodity price environment remained strong and our financial results continue to reflect exceptional operating performance, which included a number of records across both our upstream and downstream business lines. In the upstream, we achieved total production of 421,000 gross oil-equivalent barrels per day in the first quarter, underpinned by record performance at Kearl, which delivered 277,000 total gross barrels per day of production, which, as I mentioned, was the highest first quarter production in the asset's history. I'll talk about each asset in more detail in a few minutes. In the downstream, we continue to see strong operating performance as well, with refining throughput averaging 407,000 barrels per day, which equates to refinery utilization in the quarter of 94% and included record first quarter throughput at our Nanticoke Refinery. Crack spreads strengthened over the quarter with improving gasoline fundamentals, and we continue to capture additional margin from advantaged Canadian Crude. With that, I'll pass things over to Dan.

Speaker 3

Thanks Brad. Starting with financial results for the first quarter, we recorded net income of $1.195 billion, a decrease of $53 million from the first quarter of 2023, primarily reflecting lower margins in the Downstream, partly offset by higher realizations in the upstream. Looking sequentially, our first quarter net income is down $170 million from the fourth quarter of 2023, reflecting an expected seasonal decrease in upstream production volumes. Now looking at each business line, upstream earnings of $558 million are down $212 million from fourth quarter earnings of $770 million, driven primarily by lower production volumes. Downstream earnings of $631 million are up $36 million from fourth quarter earnings of $595 million, mainly reflecting higher refining margins, partly offset by lower product sales volumes. Finally, our Chemical's business generated earnings of $57 million, up $40 million from the fourth quarter, reflecting the absence of the Sarnia gas cracker turnaround that was completed in the fourth quarter. Moving on to cash flow, we ended the quarter with about $1.2 billion of cash on hand. In the first quarter, we generated about $1.1 billion in cash flows from operating activities, excluding working capital effects of about $450 million, cash flows from operating activities in the quarter were about $1.5 billion, down about $30 million from the first quarter of 2023. Cash flows from operating activities were also impacted by unfavorable LIFO WACC, deferred tax impacts driven by higher commodity prices in the first quarter of 2024, as compared to the fourth quarter of 2023. As a U.S. GAAP LIFO reported company, we tend to see negative inventory-driven deferred tax impacts when prices rise and positive impacts when prices fall. Now we'll discuss CapEx. Capital expenditures totaled $496 million in the first quarter, up $67 million from the first quarter of 2023, and remain in line with our plans and full-year guidance of $1.7 billion. In the upstream, first-quarter spending focused on smaller projects to sustain and grow production at Kearl, Syncrude, and Cold Lake, as well as progressing the In-Pit Tailings Project at Kearl and the SA-SAGD Grand Rapids Project at Cold Lake. In the downstream, first-quarter spending mainly included progressing a renewable diesel project at Strathcona. Shifting to shareholder distributions, in the first quarter of 2024 we paid $278 million of dividends. A reliable and growing dividend is the cornerstone of our cash distribution strategy and this morning, we declared a second quarter dividend of $0.60 per share payable in July, consistent with our first quarter dividend. We continue to demonstrate our long-standing commitment to delivering industry-leading returns to our shareholders and we are positioned to deliver 30 consecutive years of dividend growth this year. Additionally, in line with our long-standing philosophy of returning surplus cash to shareholders, we intend to file for renewal of our normal course issuer bid in late June 2024, consistent with prior years. Under the terms of the NCIB, Imperial Oil would be permitted to repurchase up to 5% of its outstanding common shares during the ensuing 12 months. Now, I'll turn it back to Brad to discuss our operational performance.

Brad Corson Chairman

Thanks, Dan. Upstream production for the quarter averaged 421,000 oil equivalent barrels per day, which is down 31,000 barrels per day versus the record fourth quarter and up 8,000 barrels per day versus the first quarter of 2023. The first quarter reflects expected seasonal factors driven by winter weather conditions. Overall, this is a very strong quarter and a great start to the year. Over the quarter, we saw WTI prices soften slightly, but the WTI-WCS differential did tighten with a net result being stronger realizations for our bitumen. A key factor is the approaching start-up of TMX which will provide significant additional capacity for egress out of the Western Canadian basin. And as we've seen this past quarter, the anticipated structural tightening of Canadian crude differentials is already being realized. Completion of infrastructure projects, such as TMX, are crucial to the competitiveness and growth of the country's energy industry and the strength of the Canadian economy. Going forward, we do expect to see a narrower WCS differential that will further support strong value delivery from our upstream and a net benefit to Imperial. So now, let's move on and talk specifically about Kearl. Kearl's production in the first quarter averaged 277,000 barrels per day gross, which was down 31,000 barrels per day versus the fourth quarter and up 18,000 barrels per day from the first quarter of 2023. This represents the best-ever first-quarter performance at Kearl, surpassing the previous record of 259,000 barrels per day in the first quarter of 2023 by a wide margin. Improving our winter operating performance has been a key focus for our Kearl team over the past few years as we take learnings from the extreme cold weather challenges we experienced in early 2022. We have been diligent in applying these learnings to our processes and procedures, which has enabled the team to deliver January monthly production rates that were nearly 90,000 barrels per day gross higher than January of 2022. This is especially noteworthy because we had multiple weeks this January where the temperature was actually colder than in 2022. And then, we followed up January with record monthly production in both February and March. And although this month of April is not over yet, we are on track to set another record, which is positioning us very well to deliver on our full-year guidance of 280,000 barrels per day gross. I would also like to remind everyone that Kearl's annual plant turnaround is going to start late next week and run through the month of May. Our team has been working hard at optimizing the scope and execution of our annual turnarounds at Kearl and has been successful in reducing both the cost and the duration of our turnaround this year compared to prior years. This work is anticipated to enable us to complete this year's turnaround at a lower cost and with lower impact to annual production compared to prior years which has been reflected in our turnaround guidance for 2024. Lastly, turning to operating costs. Kearl continues to make significant progress on its journey to achieving an annual unit cash cost target of below US$20 per barrel. Unit cash operating costs in the quarter were US$20.66 per barrel, which is a great achievement. Compared to the first quarter of 2023, unit costs are down over US$4 per barrel, and compared to the first quarter of 2022, down nearly US$14 per barrel, which demonstrates progress Kearl has made in reducing its cost structure and improving reliability. I would also note that when you normalize for energy costs and foreign exchange back to 2020, which is when we set the $20 per barrel target, the first quarter unit cost would be around US$19.50 per barrel. Overall, Kearl has delivered an incredibly strong quarter and is positioned to have a strong back half of the year once our planned turnaround completes in May. So now turning to Cold Lake. Cold Lake production for the first quarter averaged 142,000 barrels per day, which was 3,000 barrels per day higher than the fourth quarter and 1,000 barrels per day higher than the first quarter of 2023. You may recall that we went through an extended period of lower production in 2023 due to steam cycle timing, so I'm very pleased to see strong performance in the first quarter with production back above 140,000 barrels per day. I'm confident in Cold Lake's ability to meet our guidance for the year. Moving to the Grand Rapids Phase 1 project. Throughout the first quarter, we continued to progress the initial steam injection phase, and I'm pleased to share that we are now very close to the finish line and expect production to begin ramping up in the coming weeks. This has been a tremendous journey for us as we work hard to bring on production from the industry's first-ever SA-SAGD development which, as many of you may recall, we actually accelerated by one year, given the strategic value of this project. Grand Rapids Phase 1 is an important step in our strategy to transform Cold Lake by progressing capital-efficient projects that deliver lower cost and lower emission production. By using SA-SAGD technology, Grand Rapids is expected to deliver 15,000 barrels per day of production and an emissions intensity that is 40% lower than the technology in use today while also reducing Cold Lake's overall unit cost by about US$1 per barrel. So right now, our Cold Lake team is laser-focused on getting Grand Rapids Phase 1 over the finish line, and I look forward to celebrating the first production milestone in the very near future. Before I move on to Syncrude, I just want to take the opportunity to provide a brief update on our Leming redevelopment project, which is another important growth project for us at Cold Lake. The focus for this year continues to be on facility construction and well completions, which are progressing on plan for start-up in 2025 with projected average production of about 9,000 barrels per day at peak. Now, a few comments on Syncrude. Imperial's share of Syncrude production for the quarter averaged 73,000 barrels per day, which was down 12,000 barrels per day versus the fourth quarter and down 3,000 barrels per day versus the first quarter of 2023, primarily due to unplanned maintenance and lower bitumen recovery levels. In order to continue to maintain high upgrader utilization rates throughout the quarter, Syncrude leveraged the interconnect pipeline system to import bitumen and produce about 10,000 barrels per day, our share of incremental Syncrude suite premium. I would also like to highlight that the annual coker turnaround began during the final days of the quarter and is expected to run through the end of May. At this time, we expect the annualized volume impact of the turnaround to be consistent with our annual guidance for the year, which is around 6,000 barrels per day, our share impact on a full-year basis. Now, let's move on and talk about the downstream, which is another positive story for us. In the first quarter, we refined an average 407,000 barrels per day, which was flat with the fourth quarter and down 10,000 barrels per day versus the first quarter of 2023, reflecting a utilization of 94%. As I mentioned earlier, our Nanticoke refinery achieved its highest ever first quarter throughput. In addition to strong operations, our downstream business benefited from improving crack spreads over the quarter. I really believe the strength of our downstream results this quarter clearly demonstrates the value of integration between our business lines, which remains a source of differentiation and a significant competitive advantage for us. Within the second quarter, there are planned turnarounds at both our Sarnia and Strathcona refineries. The Sarnia turnaround began in early April and will be complete in the coming days. While the Strathcona turnaround began in mid-April and is expected to be complete by mid-May. Both turnarounds are currently tracking in line with our guidance for the year. At our Strathcona refinery, construction work continues on Canada's largest renewable diesel facility with a number of process unit modules arriving on site, including the 155-foot main reactor, which weighed over a million pounds and was fully installed this quarter. Overall, we've made a lot of progress on construction over the past few quarters, and it's hard to believe that less than a year ago, we just started talking about mobilizing our contract workforce. And looking at the site today, everything is really coming together nicely, and the facility is starting to take shape. On the feedstock side, we continue to execute our contracting strategy to ensure adequate supply to the facility. As we have shared previously, the main source of feedstock for the facility will be from crops in Western Canada. We also want to thank the Government of Alberta for their recent recognition of the project's benefits to the agricultural industry through the Agri-Processing Investment Tax Credit Program. Imperial's facility will provide an important new lower-emission offering to Canada's transportation sector in support of our collective greenhouse gas emissions reduction goals. Petroleum product sales in the quarter were 450,000 barrels per day, which is down 26,000 barrels per day versus the fourth quarter and down 5,000 barrels per day versus the first quarter of 2023. We continue to see steady refined product demand with gasoline and diesel at approximately 90% of historical range and jet at about 100%. I also wanted to highlight the continued strong performance of our retail brand in the market. Based on recently published data, our ESSO brand has now achieved the leading market share in Canada on a stand-alone basis. This builds on our previous position of holding the leading market share when combining our two retail brands, ESSO and Mobil. This significant achievement has been enabled by the hard work of our team and developing strategic partnerships with best-in-class convenience retailers, as well as Canada's leading loyalty program, PC Optimum. I'm very proud of this achievement and we're committed to continuing to enhance our brand and product offering to further strengthen our market position. In the quarter, we made the decision to proactively replace a section of the Winnipeg products pipeline following routine inspections that identified increased strain on the pipeline where it crosses the Red River, which we believe to have been caused by ground movement on the riverbank. Imperial is committed to safety and integrity in all of our operations, and we made this important decision to ensure the continued integrity of the line. Our team has worked hard to upgrade our logistics network in the region and has added rail offloading capability to our Winnipeg terminal, which will help to ensure the continued supply of fuel to the region and minimize disruption to our customers while maintenance work is completed. Currently, we have begun horizontal drilling work to replace a segment of the pipeline, and drilling activity will take place over several weeks. Imperial has extensive experience using horizontal directional drilling technology, and we will be working very closely with provincial regulators while the work is executed and providing regular updates to the community. Overall, the work remains on schedule and within our original timeframe of a return to service in June. Until that time, we will continue to take the necessary steps to ensure the reliable fuel supply to Winnipeg and the surrounding area. I'd like to thank our partners in government, our neighbors in the surrounding communities, and our customers for their understanding and patience, as well as our employees and contractors that are working around the clock to return the pipelines to service. Turning now to Chemicals. Earnings in the quarter were $57 million in the first quarter which was up $40 million versus the fourth quarter and up $4 million versus the first quarter in 2023. The higher earnings were driven by the absence of the gas cracker turnaround that occurred between mid-September and the end of October last year. Before I wrap-up, I would also like to highlight that the Pathways Alliance continues to make progress on the engineering and design of the proposed Carbon Capture and Storage projects with regulatory filings beginning in March, starting with transportation network applications. This is an important milestone, as we continue to work with governments to advance the plans for this very important project. In parallel, we continue to have constructive discussions with the federal and provincial governments, in order to finalize the fiscal frameworks necessary to ensure the investability of these important projects and to support Canada's ambitions to achieve net zero by 2050. Wrapping up, this was another strong quarter and an excellent start to the year, underpinned by reliable operations across our integrated business model and in particular, the continued progress Kearl has made in growing production and reducing its cost structure. I would also like to thank our entire workforce for their hard work and commitment that has supported these results. As we start the second quarter, we have a higher level of planned turnaround activity. And we will be very focused on executing this work safely and efficiently. I'm also very excited that we are close to seeing the first production from Grand Rapids and the continued progress of our Strathcona renewable diesel project. Both projects are an important part of our commitment to continue to deliver energy that society needs, while generating value for our shareholders and reducing emissions. As I look ahead, I remain confident in our ability to deliver on our commitments and achieve our guidance for 2024. And I look forward to continuing to bring you updates throughout the year. As always, I'd like to thank you once again for your continued interest and support. And now, we'll move to the Q&A session. So I'll pass it back to Peter.

Peter Shaw Head of Investor Relations

Thank you, Brad. As always, we'd appreciate it if you could limit yourself to one question, plus a follow-up, so that we will get to as many questions as possible. So with that operator, could you please open up the call for the first question?

Operator

Thank you. The first question comes from Manav Gupta of UBS.

Speaker 4

Congrats on a very strong quarter again and all the records you set at Kearl. My question here relates to the start-up of TMX. Look, on paper, it looks like an Upstream and Downstream volumes match the other, but you have a very unique portfolio where the Upstream is a lot more levered to the Bitumen prices, which are heavy and the Downstream uses a lot less WCS and other kinds of Crude. So technically, TMX starts up, there will be a compression of differentials, but you see more on the heavy side and somewhat modest on the light side. So your upstream technically should benefit a lot more. And the downstream, there will be a little bit of a hit, but not as much. So, can you talk about the portfolio as it relates to the start-up of TMX and contracting differentials?

Brad Corson Chairman

Yes. Thanks for the question, Manav. And I think you characterized it quite accurately for us. TMX is going to be very advantageous not just for the industry, but for Imperial overall. Our production, of course, is heavily weighted towards heavy crews and that will be kind of the key focus of shipments on TMX as it expands its capacity significantly. And we will obviously benefit from the flexibility to ship crews on that system, but more importantly, the overall impact it will have on tightening the differentials. And as I mentioned in my prepared remarks, we've already seen that tightening occurring by several dollars a barrel, and we expect that to continue with the imminent startup of the system. We do, of course, as a refiner, Canada's largest refiner, we do consume a lot of crude in order to manufacture our products. The crudes we refine, although there are a mix of heavy crude, synthetic crudes and light crudes are more kind of leveraged towards the lighter crudes, which we'll see some impact to the differential, but not as much as what we're seeing on the heavy crude. So net-net, we are a significant beneficiary of tighter differentials. So TMX is very positive for us.

Speaker 4

Perfect. My quick follow-up is, a few years ago, you had a growth project called Aspen, which you decided was not the best investment at that time for several reasons. One reason was the volatility of the differentials. If that volatility has been absent for about 5 to 8 years, could you potentially revisit that project and consider moving forward with Aspen?

Brad Corson Chairman

Yes, that's a great question. Aspen is a valuable resource for us. Several factors contributed to our decision to pause that project a few years ago. One of those factors was market volatility, but more importantly, we were concerned about access to full value markets for the crude that would be produced from Aspen. Additionally, there was significant uncertainty in the regulatory environment at that time. Currently, we are seeing an improvement in those fundamentals. Furthermore, we have been advancing our proprietary research on technology to develop Aspen using solvents. We have developed a new technology called enhanced bitumen recovery technology, which we believe has potential applications for Aspen. This could lead to lower costs, reduced greenhouse gas intensity, lower operating costs, and significantly less water usage. We have developed this technology in our research laboratory in Calgary and are now working on a commercial pilot test, which will take a few years. However, we see this as a way to enhance the value of that development. Our current focus is on ensuring we can advance that project in a manner that maximizes value for all our stakeholders. More updates will follow.

Speaker 4

Thank you so much.

Operator

Your next question comes from Menno Hulshof, TD Cowen.

Speaker 5

Thanks and good morning, everyone. I'll start with a question on Kearl, where you clearly had another very strong quarter. You've talked about secondary recovery and mine optimization, driving an increase in capacity to potentially 300,000 barrels per day. So I guess the question here is, when do you think you'll be in a position to formally increase mainly to 300? Is that still the right number? Or could we see you stretch something beyond that, call it, 310 to 320? Thank you.

Brad Corson Chairman

Yes, thank you for the question, Menno. I’m very proud of what we've accomplished at Kearl. Each quarter, we continue to set new records. While it's expected that we'll maintain this momentum, it's important to remember that achieving these records requires a tremendous amount of hard work, which I certainly appreciate. This reflects the dedication of our workforce, and I am proud of their efforts. I believe we will continue to see increased production from Kearl over time and lower unit operating costs. Together, this will result in greater value generation from Kearl. Regarding your question about reaching 300, it might exceed that number. Our teams are focused on this every day. It has taken various projects to reach 270 last year and aims for 280 this year, and the same approach will apply to reach 300. The team is working on these plans and we will provide more details during our Investor Day later this year. However, I would recommend tempering expectations for something beyond 300 at this point. We aspire to exceed that, but we must progress step by step. This is a significant asset with a lot of complexity, and we are addressing each component progressively. We look forward to sharing our plans, as they are very important to us. Thank you for your question.

Speaker 5

Yes. Thanks for that, Brad. And the second question relates to IT. We've seen a few companies go through some pretty significant and costly upgrades to reduce cyber risk, improve data aggregation and the like. Is that something we may see from Imperial? Or do you feel like you're already in pretty good shape on that front?

Brad Corson Chairman

Well, in terms of technology and data analytics in general, that's something we continue to work on every day. I mean that is an underpinning component of our success with higher volumes. Our success with lower unit operating costs is to apply technology. We've talked at our Investor Day in the past about the potential for digital applications to improve or lower our operating costs by $500 million additional value. I think the last time we reported it was up to $1 billion. We continue to see that opportunity set continue to grow. And we're working on that within Imperial. We also leverage ExxonMobil and all the work they do around technology, including data analytics. So again, that's an integral part of what we do. Specific to cybersecurity, that is also something we take very seriously. We recognize the growing threat of cybersecurity in our society. And we have a team of experts, both locally and working jointly with ExxonMobil to ensure we are employing the latest safeguards around cybersecurity events, and I'm quite pleased to report that we have not experienced any direct cybersecurity events, and we're going to continue to keep that vigilance, but that's something we have to continue to work on every day. Thank you.

Speaker 5

Thanks again. I’ll turn it back.

Operator

Thank you. And our next question comes from Dennis Fong, CIBC World Markets.

Speaker 6

Hi, good morning, and thank you for taking my questions. My first question is about Grand Rapids. I understand it’s still in the early stages, and you mentioned the project's status in your prepared remarks. I'm curious about the progress regarding steaming and how that might lead to increased production during the initial phase. Also, what would you need to feel confident about potentially approving the second phase?

Brad Corson Chairman

Yes. Thanks for the question, Dennis. I mean, we're quite pleased with the progress that we're making at Grand Rapids, as we've described in the past, the first phase to starting up, this SA SAGD development is with steam injection into the reservoir to fully heat it up before we would start producing back oil. So we started that work late last year with the first pad or set of well pairs. And then a couple of months later this year, we started with the second pad and group of wells. That is going exactly as we anticipated. And consequently, we would expect sometime early next month to start some of the initial production, and it will be a phased process over several months as we convert from this steam phase initially to installing the pumps and the wells and then gradually start bringing them on. And so, we'll start to see production next month and we'll ramp it up over the course of the year. We would certainly expect by the time we get to the fourth quarter that we would be at the 15,000 barrel a day rate. And then in terms of sanctioning the next phase, that's something our teams are working on. We see a lot of potential at Grand Rapids and the potential for several more phases. We want to make sure we capture all the learning's from this first phase before we start implementing a second phase. But that's something as we gain experience over the course of this year we'll be starting to bring that kind of internal to our planning process. And that's something we'll be talking more about when we get to Investor Day. But I'm quite encouraged by the potential of Grand Rapids.

Speaker 6

Great. Great. Appreciate that color and context. I wanted to shift, frankly, towards digital and AI technology. I appreciate, we'll call it part of your answer to Menno's question, may have also partially answered this. But at Investor Day in the past, you've highlighted a digital twin of the Kearl facility. I wanted to understand if there were any kind of further takeaways now that you've had a few years of operation with both the model versus real-time operations, and maybe how that specifically improved your understanding on the ability to drive stronger utilization in the facility and or lower costs, both operating and maintenance?

Brad Corson Chairman

Yeah, thanks for that question, Dennis. And, you know, the digital twin is an extremely cool concept and something that has a lot of value to us as we think about, future optimizations at Kearl. Simon's here with me, and maybe I'll ask Simon just to make a couple of comments about our experience with that and where it may take us.

Speaker 7

Yep, sure. Thanks, Brad. As you referenced, we've had the digital twin at Kearl up and running for a couple of years now, and we've actually also implemented it at most of the Cold Lake plants as well. So it's been a hugely successful technology for us. It's helping us both improve costs, as you referenced, but also improve production. So it's allowing us to do several things. For example, improve the efficiency and effectiveness of our maintenance planning, improve the efficiency and effectiveness of our projects execution and implementation, and it's also allowing us to optimize production using AI, optimize recovery rates, optimize steam flood injection rates, optimize water balance, those are Cold Lake examples. And the technology actually is broadening beyond us and is sort of gaining widespread use in ExxonMobil as well, leveraged certainly in part by our experience here at Kearl and Cold Lake. So, very much a success story impacting the bottom-line, both from a cost and a production standpoint.

Speaker 6

Great. Appreciate the color. I'll turn it back.

Operator

Thank you. Your next question comes from Neil Mehta with Goldman Sachs.

Speaker 8

Yes. Good morning Brad and team. Two quick questions for me. Just one on return of capital. That's been a hallmark of your leadership, as we think about the timing of share repurchases, how do you think about the NCIB? I guess that starts up here in the next couple of months? And then the SIB, if we follow the cadence for the last couple of years, it's fair to assume we'll get that later this year if the commodity stays strong or is there a potential for sneak one in, in the first half of the year? So that would be my first question.

Brad Corson Chairman

All right. Thanks, Neil. Well, Dan loves to talk about capital distribution and share buybacks. So, I'll let him talk a little bit about the cadence that we see.

Speaker 3

Yes, Neil, as I mentioned during the call, we fully intend to file for the renewal of our NCIB in late June as we have in the past. In recent years, we have accelerated that NCIB, which allows us to buy back 5% over a full year from what is on file. As you correctly pointed out, we have also conducted one or two SIBs in the last few years. Our record shows that we remain fully committed to returning surplus cash to our shareholders. The timing of whether we accelerate the NCIB, execute an SIB, or pursue another option will depend on the commodity price environment, which is currently quite favorable. If prices hold steady, we expect our cash flow to grow significantly over the year. While we cannot specify exactly when this will occur due to market factors, our history shows that as we generate surplus cash, we will return it to our valued shareholders.

Brad Corson Chairman

So Dan, that will continue to be quite optimistic.

Speaker 8

That's great. And then the follow-up is on the pathways project, Brad, you and I have talked about this a lot. There's a lot about this project that we love, including the ability to decarbonize the oil sands. The one outstanding concern that we get from a lot of investors is the history of cost overruns in Western Canada, whether it's oil sands or Coastal GasLink or certainly TMX and LNG facilities, given the tight labor market and equipment market. So just your perspective on how do we get it right on the front end to make sure that contingencies are built in. So when you ultimately move forward with the project that we don't have a repeat of the challenges in the past?

Brad Corson Chairman

Thank you for the question. There is certainly a history of large infrastructure projects in the country, and I believe that applies globally as well. What sets Pathways apart, and what I think will make this project successful, is the collaboration among our six member companies and the collective experience we bring to project execution. In Canada, we are focused on addressing regulatory approvals and potential delays upfront to minimize any disruption. It's crucial for us to deliver these projects not only on time but also at the lowest possible cost. We have a dedicated team working on project design and planning, and we will test our assumptions across various scenarios. As with any major project, we will include reasonable contingencies in our planning. However, the priority for the Pathways project and our shared goals with the government is to move forward effectively, as there are many components involved, including various capture projects, a large pipeline, and a sequestration hub. We must execute this work in an organized manner and avoid letting deadlines dictate our process, as we will require thousands of workers to complete this project. It’s essential to follow a well-thought-out plan to prevent significant cost increases. Overall, I am optimistic that we can achieve this.

Speaker 8

Brad, as a follow-up, do you think we are on track to officially finalize this project, place an order for the pipe, or make significant progress by the end of this calendar year? Or is it still too early to determine?

Brad Corson Chairman

That's certainly an objective. And that is it's critical for us to make a mill reservation for the pipe order by the end of the year in order for us to achieve the 2030 start-up timing that we've laid out. I'm encouraged by the discussions that are ongoing between the Pathways member companies and the provincial and federal governments, but we still have work to do. But I think everybody is committed to that timeline, and so I continue to be optimistic.

Speaker 8

Okay. Thank you, sir.

Brad Corson Chairman

Thank you.

Operator

Your next question comes from Patrick O'Rourke, ATB. Please go ahead.

Speaker 9

Hi. Good morning. It's Nolan Akins here. I'm standing up for Patrick, and thanks for taking my question. The first question I wanted to ask here was on operating costs. We're up slightly year-over-year at Cold Lake and materially down a bit at Kearl. How much is energy cost playing into that, and what's the key driver for the improvements at Kearl? What's left to do there?

Brad Corson Chairman

Yeah. Thanks for the question, Patrick. We talk about operating costs pretty much on every earnings call because it is a key priority for us. I'm quite pleased with the progress we're making at Kearl. There's many components that go into Kearl's cost structure. One of the most significant ones we've talked about of late is the autonomous hauled trucks, and over the course of the last couple of years, we've been gradually converting that fleet to entirely driverless and we completed that work late last year. Our assessment is that's contributing at least a dollar per barrel savings to our cost structure. But that's just one of many things. I talked a little bit about our turnaround plans for this year. That's been an ongoing focus for us, dating back a few years now where we went from two turnarounds to one turnaround per year. That's saved several tens of millions of dollars for us. Now we're on this cadence of one turnaround per year, but we're looking at how we can do that more efficiently and at lower cost. And our guidance for this year for essentially the same scope as last year has us doing that work in a shorter period of time at a lower cost. So that's another example. But the cost structure kind of leverages initiatives around every part of our business, our contracting strategy, our maintenance strategy, our energy usage, all these things together is what's driving these improvements. One thing that differentiates Cold Lake from Kearl is the nature of that operation is very different. It's very steam intensive and consequently very dependent on fuel gas. And so that's a key driver in its cost structure. But beyond that, all the other things like I just talked about at Kearl with contracting strategy, maintenance, energy usage, we're continuing to look at ways to improve those as well. And then with Grand Rapids starting up, as I mentioned, that'll take about a dollar per barrel out of the cost structure for Cold Lake overall. So a lot of really important initiatives there.

Speaker 9

That's a good answer. I'll turn it back.

Speaker 3

Thank you.

Operator

Thank you. This does conclude today's question-and-answer session. I'd now like to turn the call back to Peter Shaw, Vice President of Investor Relations, for closing remarks.

Peter Shaw Head of Investor Relations

Thank you. On behalf of the management team, I would like to thank everyone for joining us this morning. As always, if there are further questions, please don't hesitate to reach out to anybody on the IR team, and we'd be happy to answer your questions. With that, thank you very much, and enjoy the rest of your day.

Operator

This does conclude today's call. Thank you for your participation. You may now disconnect.

Analyst Q&A · 5 questions
Full-screen source Call document