Lightbridge Corporation expects the Pilot Factory to require approximately $140 million over a five-year development and construction period, while nine-month net loss widened 65% to $20.4 million as operating expenses rose 77% to $25.6 million.
LTBR · LIGHTBRIDGE Corp
You came from your AI assistant. Add Equibles to it and ask about this data directly, free.
Price & Indicators
Key stats
- Short volume, last session
- 37%
- Last earnings
- Nov 2, 2026
- Latest filing
- 10-Q · Nov 4
- Price history
- Jan 2020 to Nov 2026
Up next
Latest documents
Lightbridge was selected in August for the Nuclear Energy Launchpad INL program, an accelerated path toward DOE authorization of a pilot fuel facility. Cash stood at $236.7 million on September 30, 2026.
Lightbridge Corporation was selected for the DOE Nuclear Energy Launch Pad INL program in August 2026, advancing a pathway to Pilot Factory authorization. It reported a $8.3 million quarterly net loss and $236.7 million in cash at September 30, 2026.
Metrics snapshot
Useful current figures from the complete screener profile.
AI Brief
Q3 FY26 earnings call · Nov 2, 2026TL;DR. Lightbridge advanced its DOE pilot-factory pathway, ATR testing, post-irradiation work, patent coverage, and liquidity position, while management expects initial meaningful test results in the first half of 2027. Financial risk increased as losses, R&D spending, and operating cash use rose, with additional capital required and pilot-factory construction still subject to approvals and prerequisites.
- + DOE Launchpad selection provides an accelerated pathway to a pilot factory for manufacturing lead test assemblies.
- + Lightbridge secured access to ATR loop testing for clad fuel rodlets.
- + Meaningful results from the first post-irradiation examination are expected in the first half of 2027.
- + Cash increased to approximately $236.7 million, and the company had no debt.
- + Patent protection for the multi-zone fuel element and 3D printing method expanded in Japan.
- + Management believes a utility could conditionally host lead test assemblies before completion of ATR testing.
- − Third-quarter net loss increased to $8.3 million, or $(0.23) per share, from $4.1 million, or $(0.16) per share.
- − Nine-month net loss increased to $20.4 million, or $0.62 per share, from $12.4 million, or $0.55 per share.
- − Nine-month R&D expenses increased by $7.3 million to $12.6 million.
- − Cash used in operating activities increased to approximately $13.2 million from $8.1 million.
- − Pilot Factory development will require additional capital over time.
- − Pilot Factory construction remains subject to additional agreements, reviews, authorizations, and prerequisites.
AI-generated from the earnings call and 8-K · may contain errors · not investment advice
Equibles Rating
blended score · not investment adviceBlended from price, momentum, positioning, fundamentals & volatility · daily-close · not investment advice. Market backdrop is context, not part of the score.
Guidance & track record
Guidance from company 8-Ks · delivered figures from as-reported statements · no analyst estimates involved.
Technicals
trend & momentum for long-term holders Strong SellIllustrative technical + ownership context — a signal mix, not investment advice.
Key metrics
Earlier KPI extraction records exist, but do not meet the current evidence-completeness requirements. No current verified series is available. Earlier figures remain withheld until revalidated; this is not evidence that the company reports no KPIs.
Versus peers
Electrical Equipment & Parts — same industry group| Company | Mkt cap | YTD | Rev growth Y/Y | P/E | Short % shares |
|---|---|---|---|---|---|
|
LTBR
this stock
LIGHTBRIDGE Corp
|
$122.50M | -75.0% | — | — | 11.2% |
|
CYATY
Contemporary Amperex Technology Co., Limited
|
$175.65B | — | — | — | 0.0% |
|
ABLZF
Abb Ltd
|
$140.51B | +0.2% | +9.5% | — | 0.2% |
|
VRT
Vertiv Holdings Co
|
$66.76B | +7.0% | +27.7% | 32.4 | 3.2% |
|
BE
Bloom Energy Corp
|
$45.20B | +76.0% | +37.3% | — | 7.1% |
Peers by industry group · P/E from as-reported trailing EPS · short % is of shares outstanding
At a glance
key data from every section- Filed
- Nov 4, 2026
- This year
- 16
Lightbridge Corporation expects the Pilot Factory to require approximately $140 million over a five-year development and construction period, while nine-month net loss widened 65% to $20.4 million as operating expenses rose 77% to $25.6 million.
ViewPerformance
| 5D | 20D | 120D | MTD | YTD | |
|---|---|---|---|---|---|
| LTBR | -13.0% | -41.9% | -66.5% | -37.8% | -75.0% |
| SPY | -1.9% | -7.2% | -2.8% | -5.2% | +5.1% |
| vs SPY | -11.1% | -34.7% | -63.6% | -32.6% | -80.1% |