Drdgold Ltd (DRD) Q4 2026 Earnings Call Transcript

Concluded Aug 19, 2026 Audio replay Verified speakers
Aug 19, 2026 1:22:20 40 turns
Period
FY2026 Q4
Runtime
1:22:20
Sources
3 artifacts
Open full screen Slides 27

Transcript & audio

Verified speakers 1:22:20 Audio

Okay, it's 10 o'clock. I suggest we start. Good morning, everyone. Thank you very much for joining us today for this presentation. Before we start, I just want to pause for a moment to remember a very good friend and advisor of ours, John Weber, who was, as long as I had been with the company, he was one of our professional advisors and attorney with the firm Cliff Becker and Hofmeyer who passed away the week before last after he was very very sick so we'll remember him and he was a valuable he was a dear friend and a valuable service provider. All right so it's a privilege again to be presenting to you today this is the 19th time that I've been doing this the year-end results or that was part of the team that presented the year-end results some of you were there the very first time many new faces i'm joined today by my colleagues henriette who's our cfo and yaku is our chief operating officer and then there are also several members of senior management who are here so please afterwards we have to eat the food it's expensive food so we can't leave before it's been all of it's been eaten. So please ask them questions if you want any clarification on anything. We will be around for a few minutes after the presentation. Please also just take note there's the customary disclaimer so there will be forward-looking statements in this presentation and some of those forward-looking statements are based or those forward-looking statements rather are based on assumptions and some of those assumptions we don't have control over. So just be mindful in the interpretation of those that are contingent upon a number of factors that we don't necessarily control. It's been a very good year for DRD Gold. It is the 19th consecutive financial year where we'll be paying a dividend and the final cash dividend for the year is 120 per share, which is just over a billion Rand, which was roughly the market cap of the company when I first did the presentation 19 years ago. And it was as a consequence of a number of factors working together. And obviously in order to have the revenues and the cash flows from which you could pay this cash dividend, you need the production. So production was was pretty pleasing. We managed to come in just below the five tons of production. And five tons is prominent because you would have seen it in our communications when we talk about Vision 28. And what was pleasing in particular was the fact that it was roughly 5,000 ounces higher than the higher end of guidance for the year. And that was because of what I thought was very smart management of the throughput mix of the material going into the mix, you will see that we achieved an average yield of just under 0.2g per tonne, which was a 2% increase, so the plants were working really efficiently. Obviously, the big role player this year was the increase in the Gold price, and being a deliberately unhedged producer of Gold, we have never hedged, with the exception of a very small period of time when we needed to protect cash flows in order not to test some of the ratios that form part of a financial arrangement that we had at the time. This was in 2018 when we built Far West Gold. It never hedged and deliberately so. So we were in a position to take full advantage of the 40% increase in gold price and that translated into revenue for the year of just over 11 billion Rand, 42% increase in revenue. Cash operating costs for the year was just under a million Rand a kilo, which was also better than guidance, and a 7% increase year on year, which considering the number of double digit increases that form part of the cost basket of coal production in South Africa, I think was testimony to some really good cost discipline, cash operating costs, a slightly higher increase of 10% at R188 per tonne. And that is because there was a larger component of trucking that still form part of the cost composite this year. And in the current climate, trucking your high grade material, expending the higher costs in order to truck those cleanup materials and remnant materials is always a good idea because of the higher grade that invariably from part of those tons and at the current gold price it does offer a very attractive margin if the gold price decreases then obviously that margin shrinks and you lose some of that gearing so you do want to take advantage of the higher gold price and truck in some more materials and there'll be some of that also in the year going forward. So the tracking will be part of the profile of the throughput profile for the foreseeable future. That obviously then translates into your operating profit. So 6.4 billion ran in operating profit, 83% increase. That's a very nice number, which informs your headline earnings 4.2 billion in headline earnings and 89% increase free cash flow, which is very important parameter for us, because as a dividend paying company, generating cash is a very important measure of internal measure of our efficiency. So to have generated 2.2 billion rand in free cash flow was very pleasing. That was an 85% increase. And that was after capital expenditure of 3.5 billion rand for the year. Okay, we'll take you through some of the capital spent this year, as well as the capital planned for the next two years and then it's an important number to remember because we're talking final dividend of just more than a billion against free cash flow of 2.2 and capital expenditure of 3.5 billion and remember a big part of our story of the vision 28 story is that at some point in future this number is going to become considerably smaller the 3.5 capital expenditure. Whilst at the time, hopefully that number, if the gold price holds up, will not have shrunk or will not have diminished significantly. In fact, it could be significantly higher because remember, we're targeting about a ton of additional gold production. These margins, there's the margin, the cash margin, these margins, potentially also if everything stays the same, could potentially also remain very favourable. Then as a dividend-paying company, start factoring in a substantial portion of that into what's available for your dividend, and that's the DRD promise, that's really what we're working towards this stage, and we're hoping that it will find its way into how share price is being interpreted at some stage over the next few years as we get closer and nearer to completion of Division 28 subparts. So, my point number nine, that was the free cash flow. My point number 10, that's the capital expenditure. My point number 11 is on the sustainability. This did not come at the cost of our people. This did not come at the cost of the health and the wellbeing of our people because you see that trend is still a good one from 1.65 to 1.25, 0.8 to 0.7 on those lost injury scales and ratios. And that also is not coincidental. Obviously we are very aware of the fact that sometimes there are near misses where it is only the amount of time that you spend on your knees that saves you from something really bad, but we are also very deliberately focused on how we manage safety and improving safety awareness amongst staff. Some of the other sustainability measures that we enjoy sharing, because sustainable development is core to our business, is the usage of potable water. Many, many years ago, I forget how many years ago it was, it may have been fifteen years, it may have been eighteen years, we very deliberately took the decision to reduce potable water usage by ten percent every year. And that trend, if you follow our reporting on our integrated reports over the years, you will see that trend has been healthy and it has taken us to a point now where very little of our processed water is actually potable water. Once again, you saw 900 million litres of potable water saving this year, 23% decrease, also a very deliberate part of our sustainable development value pursuit um carbon emissions is an important one so only well still a lot 233 000 tons of carbon that went into the atmosphere because of our activities but that's down from 303 000 tons of last year and that's because of uh the uh obviously because of the solar farm we haven't stopped we still have other ambitions with regards to renewable power we've spoken about some of those in the past, but I think we are on a good trend here, with the solar farm really working really, really well, and we are seeing that both in the bottom line as well as in the nature dividend that we are in pursuit of. I think that is what I am going to talk to in terms of the first slide. There is obviously quite a lot more detail that my colleagues will talk about as we go forward, so you can report these numbers if you produce. And at At this stage we are in an interim phase, we are in a phase where we are managing volume throughput because we need to manage our tailings dams very, very carefully in order to stay within the prescribed safety factors, some of those are prescribed, some of them are self-imposed but it is important that we stick to those and therefore we are not sweating our tailings storage facilities. We saw earlier this week again a report of things going wrong on a tailings dam, and that is just the unimaginable from our perspective. So, tons are deliberately kept at 25 million tons between the two operations. The yields have been good, and those yields are good for two reasons. It is both the blend and also plant efficiency. Both of our plants are operating extremely well. And a big thing for us this year as well is that, excuse me, everything that we are producing, that one part of the process where we are most vulnerable, where our product is at its most concentrated, namely when it goes into the smelthouse, that is now universally treated at our own facilities, which was a big, big milestone for us, and Jakku will talk more about that. They get to talk about all the good stuff, numbers and all the projects and so forth, so I will slip some of it in here and there. But anyway, the yields were good, and we saw that in the production numbers as well. That is now on the ergo side. Farways gold, similar, that volume line is a flat line. It's managed very, very carefully and deliberately. The yields have been pretty good, and that's as we're getting into a slightly deeper part of dam number three. so as you go deeper into the dam, gold migrating to the bottom obviously your yields do pick up, and you could see it sort of back to where it was when we were at the tail end of dam number five, and some of those materials were still being dribbled into the bigger mix. And then production, bang on target 674 kilos for the last half year, and just over 1.3 tons for the financial year. And then on a group basis these are numbers that you'll see in more detail when Henriette talks to the numbers but the volumes for the two operations combined just on 25 million tons the yields just under 0.2 gram a ton which is a good number for us we're hoping to sustain that going forward and then production just under five tons for the year. So on that note I'll hand over to Henriette to take you through some of the financial numbers.

Henriette CFO

Okay, thank you Neil. So maybe just to start off with, it's my privilege to present these excellent financial results that we have achieved during financial year 2026. Just a huge thank you from our side, I mean we couldn't have done it if we didn't have the exceptional teams that we have in DRD Gold. So from the operational guys, straight through finance team, putting this all together, and our support services. Each of us have our role to play, and I believe you've done it exceptionally well this year. Okay, if we move, group operating, sorry, I was like, Ergo, financial results. So Ergo had an exceptional last six months to the financial year, They increased their gold production with about 150 kilograms, the six months versus the next six months, really taking advantage of that excellent gold price that we saw in the last six months of just about 2,460,000 rand per kilogram average. Ergo ended their revenue at R8.1 billion for financial year 2026 in comparison to R5.7 billion last year. This was mostly due to the gold price increase of 40% that Neil already alluded to, but also a 1% increase in gold sold. Then if we look at the cash operating costs slide, Ergo's overall cash operating costs increased 7% year on year. notwithstanding all of the things that Neil already mentioned. So, I mean, we had a massive oil price increase during the last few months. That influences our machine hire, our trucking expenses, reagent costs. We saw some exceptional high increases on carbon specifically, cyanide. We had to use the briquettes, which is more expensive. All in all, though, cash operating costs well maintained. If you just look at unit costs on the Ergo side, so 1,120,000 rand per kilogram in comparison to 1,060,000 rand per kilogram last year, which is a 6% increase. Then that excellent operating profit trend that you can see there, Ergo more than doubled the operating profit from 2 billion Rand last year to 4.1 billion Rand in the current financial year. On the far west side, also a very stable operation as you could have seen from the operating trends, performing always on budget, on target, in expectation. So they, Urgo Ach Far West, increased their revenue from 2.2 billion Rand last year to 3.1 billion Rand in the current financial year, and that was mostly due to that 40% increase in the gold price. Cash operating costs increased by 10% from 674 million last year to 744 million in the current financial year. As I already, I think I mentioned it a few times, Far West is in a different operating cycle to Ergo. It is growing, it is getting ready for this expansion project, more labour hire, it is an older plant, only two sites operating of which one is a clean up site, Riffontank 5. This trend increase in costs is expected to continue next year until we see the upside of that Vision 2028 1.2 million tonnes per month kicking in. But again ending up in a very healthy profit margin, R1.5 billion to R2.3 billion in the current financial year. This is a very high margin operation so 76 profit margin which is exceptional operating profit margin just even with the increase in the gold price this is still an operation running at 561 000 rand per kilogram cash operating cost and then all in sustaining cost of 639 000 rand per kilogram so if that operation can maintain this, this will be a very successful operation going forward. Okay, if we move to the operating trends, very healthy operating margin, all in sustaining cost margin, cash flow, Neil already alluded to some of these excellent results that we've seen, but your operating margin last year, 45% in comparison to 58% in the current financial year. All in sustaining cost margin, 39% for last year in comparison to 53% for this current financial year. In free cash flow, Neil stole a bit of my thunder with regards to the free cash flow, but this is a number that we are always very proud of. It's your operating activities minus your investing activities. So yes, that increased by 85% from $1.2 billion last year to $2.3 billion in this year. And just to stand still, this is one of the reasons that we could declare that $0.120 per share dividend. So if you take that interim dividend into account of $0.50 per share, we paid out 65% of our free cash flow. We declared 65% of our free cash flow for the financial year 2026. Just then headline earnings per share, also a nice upward trend, $0.261 per share last year to 492% in this year. This then all translated into a very healthy statement of profit and loss. If you look at that revenue line, $7.9 billion increasing to $11.2 billion. again just taking into account the 40% increase in the gold price but also standing still on what Neil said so we really did not expect to have a production year as we are you would have seen our production guidance was quite lower than the previous year so to achieve that 5,500 ounces is quite substantial if you look at the cost of sales line that increased nine percent year on I already explained some of the increases in cash operating costs. Other than that, depreciation increased. And we had last year, we had a big credit of 98 million relating to our change in estimate and our provisions, which we didn't have in this current financial year. Administrative expenses and other costs, it's increased relating to our single incentives and our long-term incentive. The share price has increased. Then going into finance income, increase due to our cash balances, that's much more in this current financial year, although we didn't actually get a dividend from Rant Refinery, which was about 56 million Rant last year. So that cash balance increase would have looked even better if we had that 56 million dividend from Rant Refinery again. Finance expenses mostly relate to our unwinding on our provision for environmental rehabilitation. That takes us then to a very healthy profit before tax of $5.9 billion in comparison to $3.1 billion. Income tax, quite a big line if you look at that. Most of that relates to deferred tax, which I'll just stop on the balance sheet. But we also paid about $490 million in tax, mostly relating to Ergo due to the profitability of that operation and the unredeemed CAPEX that we actually used during the year. Okay, statement of profit, the balance sheet, excellent balance sheet, again, debt-free. I don't think we thought in 2024, when we actually undertook this debt facility at Netbank, that we would be in the position that we are in today. But yeah, standing still on property plant and equipment nice increase 8.5 billion last year to 11.9 showing that 3.5 billion reinvestment in capital that we incurred for mostly for vision 2028 investments in rehabilitation and other funds increase nicely with our interest maybe just to highlight included in there or most of that balance actually is our guard risk and sell captive that's ring things for rehabilitation in during the current year we actually celebrated going over the 1 billion rand mark for that environmental trust fund which is an amazing achievement if you look at other investments most of that relates to our 11 percent increase 11 percent investment in rand refinery which is measured at fair value we added 220 million uplift in fair value that went through that account. In cash and cash equivalents, I will just highlight when we go through the cash flow statement, other current assets, fairly stable year on year, maybe just to highlight that included in that balance, we've got 117 million receivable from Sabanya, which relates to the CLUF2 dump transfer. So we expect to receive that money regarding the environmental trust funds as soon as all regulatory approvals have been obtained. Then moving over to liabilities, provision for environmental rehabilitation, that increase that you see there from 558 million to 721, mostly relate to updated quotes that we got for demolition that was quite more substantial than what we expected. But then also the expansion on the ROS side. So, BP2 doubling up that plant and the RTSF increase that balance quite substantially. Then our single biggest liability on our balance sheet, that 2.9 billion rand deferred tax asset, which grown quite substantially during the year. This balance will continue to grow as we spend capital and as we remain profitable. Included in that balance is actually a rate change, so our weighted average rate for ergo increased from 25% to 27%, and then on the far west side from 29% to 30%, that had a 150 million swing in that line. Current liability is fairly stable, increasing a little bit just due to our accelerated capital spent okay if we move over to the cash flow statement and what a beautiful statement this is net cash inflow from operating activities 3.5 billion last year to 5.7 this year mainly driven by that cash generated from the operations of 6 billion round finance income received, so there you can nicely see the increase in finance expenses, a finance income that we actually received from the banks, no dividends received, finance expenses paid very small at the income tax that I already alluded to. Net cash outflow from investing activities, where you can see that 3.5 billion rand that we spent, I believe this is, in the past 20 years anyway, the biggest capital reinvestment program that we have done in one year. So quite substantial amount. Then environmental rehabilitation payments, although small, we're very proud of always continuously, concurrently rehabilitating our mining sites. So that is money spent on the Brachpan, on cladding on Brachpan and on our Drifontain facilities. And then proceeds from assets out for sale, I'm sure you're already all aware of the NOAA, that we sold NOAA in December, so that's just the proceeds that we received from that sale. Dividends paid, that $780 million relate to our final dividend that we paid last year of $0.40 and our interim dividend of 50 cents that we declared earlier this year ending up an increase of 1.5 billion rand to a closing cash and cash equivalence balance of 2.8 just under 2.8 billion and yeah i'll hand over to jaku to take us through vision 2028 thanks everybody i would just like to

Yaku COO

um agree with what in that has just said to the operational staff and even our contractors and our consultants all the way through to the board i think everybody right from the cleaning staff to the top to the board everybody had to fire on all cylinders to to achieve the results it feels like you've got to celebrate the the wins so hopefully um this feels like the spring box will win on saturday 50 and zero so that's the feeling we get here but yeah it's it's it's a privilege to present the operational results to you of everybody's hard work that's just a picture of dagerfontein which we'll speak to just now so just to remind you of the five projects that makes up vision 2028 two of them at ergo number one and five and then two three and four at far west the first one is dagerfontein that is a tailings storage facility which we have commissioned and i'll talk about that a little bit later on and that is at a estimated cost of about half a billion rand and that is to reduce the deposition capacity or deposition rate onto brakpan by approximately 750 000 tons per month second one at ergo i'm going to jump to number five is vitok so the vitok tailings dam that one is still in the authorization phase and the purpose of that one is for us to get off the Prachpan tailings dam in totality in conjunction with ergo and to then maintain the the deposition capacity for the ergo operations and that is at approximately three billion rand then two three and four is actually one project with three different legs to it the first one is the db2 plant expansion and that is essentially doubling up of the existing capacity of 600 000 tons to 1.2 million tons and we'll talk a little bit about that and that's at an estimated 1.9 billion then the pipelines for dp2 to rtsf that's the deposition site but then also the lebanon reclamation station in total approximately approximately 135 kilometers of pipeline and and then that is at a cost of 1.2 billion and then the RTSF which I think you all know about by now one of the biggest largest tailings dams constructed on a liner in the world 800 million tons facility we approximately two-thirds through the construction of this facility but again we'll go through that at a cost of about three and a half 3.4 billion. All right, so just an update quickly. At Ergo, Dacherfontein, as I've mentioned to you, I'm very proud to say that in June we started commissioning of the tailings dam and we have achieved the rate that we expect to achieve, which is 25,000 tons per day, which gives us 750 000 tons per month and this facility gives us an additional capacity of about 120 million ton deposition onto this facility together with vitok it will sustain our mining operation for 21 years at ergo now vitok as mentioned to you that's currently in the authorization phase we've completed our public participation process our design engineer and his team has been approved by the dam safety office and then our environmental authorization waste management license as well as the water use license has been submitted to the department and we're awaiting approval of this we hope to obtain these approvals by the end of this year if we can achieve that we then aim to complete construction of the talk during 2029 um and that will make sure that we then on to vitok vitok is about 310 million tons deposition capacity so between the two of them it will then sustain us for the last for the 21 year life of mine of over going forward on to far west again very happy that we've ticked the box on DP2 plant. On the 14th of July we commissioned the smelt house, which is one section of the plant, and also produced our first gold bar from this facility. I'm glad to see Kevin is also here. It was a gold bar, not a copper bar. And we do expect to have the balance of this plant commissioned by during this quarter just be in mind that once we've once we've got this plant commissioned it doesn't mean that we're going to immediately go up to the 1.2 million tons so we're going to commission this plant move over to this plant operate this plant and then do some refurbishment and maintenance work on on the old plant so that once RTSF is ready to take the full 1.2 million tons we can then fire up both plants so we will maintain that 500,000 tons per month throughput capacity until we're ready with RTSF to deposit onto that one the pipelines we were waiting specifically for the water use license for the Lebanon reclamation pump station and that we have received during july so another obstacle is out of the way and we about 95 complete with the pipelines and we can now start with the construction of the libanon reclamation station to be able to to put us into a position where we can produce the 1.2 million tons um of material to rtsf rtsf um as of 30 june we were about two-thirds through the construction um and that's the picture you can see in the background um obviously now hopefully i don't stuff this up yeah so um there you can see the black that's the liner um this is the starter wall going around and for those of you that that did not that missed it in july we provided the market with a full market update and we spent some significant time on explaining the technicalities around the the rtsf if you want to just review that you're more than welcome it's on there on website but this facility we do hope to have available so that we can do the full 1.2 million tons in quarter one of the 2028 financial year we have mentioned during the market update that we obviously are aiming to achieve beneficial occupation a lot sooner but depending on what the weather does and and how it rains we will then make an informed decision before we start up that facility in all earnest it's a it's as i've mentioned to you one of the biggest in the world it provides a 35 year life of mine for the operations and it doesn't help us compromising this facility at any given point in time so hence being very very prudent in starting this facility up all right um and just want to spend a little bit of time on this slide um i think what you can see here is 2026 this year was our peak peak capital spending here um this was also the year a very important year for us as as operational teams and well done again to to the projects team um this year we had to hit a few milestones um if we if we missed these milestones we would made it very very difficult for ourselves to achieve the final final timelines so um and they've they've done so by making sure that dp2 has been started up or completed commissioned as well as dagerfontein so what you can see here is that um the majority uh being spent obviously on on dp2 expansion and then rtsf Going forward, you can see that DP2 is very, very little, just essentially rollovers. We get the UFRs, which is the upflow reactors, part of DP2. And this is specifically technology aimed at improving recoveries, which we're implementing on that specific plant. you can see we continue with rtsf spending and that will also run over into 2028 but then we also intend to to bring hopefully some of the talk expenditure online during the later part of this financial year and then a very important battle continue then to 2028 and 2029 so although we about halfway through our capital expenditure program a very very important year for us and as a team very important milestones to achieve to set us up for for achieving the balance of our requirements going forward and last slide just on reserves and resources you'll see that we depleted our reserves with about 23 million tons of material that we've that we've treated but we've made that up by bringing online a clue of two which provides us with about 67 million tons and so overall increasing the mineral reserves with about four years added to the life of mine of Far West Gold Recovery. Alright, I'm going to hand back to Neil, since he's a farmer, specifically I have the sheep up there for you now.

Yeah, is that yours? Thanks, Yeah, I know, we've got to have some sheep in any presentation with its salt. So these guys keep the grass short at the solar farm. You can't go in there with bush cutters because you're going to chip those beautiful panels. So it's part of our philosophy of full integration. So just talking a little bit about our environmental performance, Enriette made mention of the concept of concurrent rehabilitation that you rehabilitate as you go along. And you know we flick through these slides and then you see a tailings dam in the distance. I do believe that the DRD team is achieving a goal that we had set for ourselves also many, many years ago, maybe 15 years ago, maybe 18 years ago, being the benchmark in terms of the activities, the various activities that we involve ourselves in. I'm not aware of current tailing storage facilities that are cladded to the extent that DRD is cladded, the Crown facility, the Crown Cluster, the Brackband facility in Dacherfontein. It is really, if you want to show people what a tailings dam should look like, if it is properly managed from an environmental containment perspective, I do believe that those tailings dams are benchmark setting in the standards that are being maintained by the team. And this has been throughout. So, when we talk about hectares vegetated, 43 hectares of vegetation, 44 hectares of vegetation, 40 hectares of vegetation, that pertains to those permanent tailings storage facilities that are going to be permanent features going forward, or that are at least going to be around for many, many years to come, and where the only means of containing dust emissions from those facilities and runoff water from those facilities is by vegetating them to the point that they have. I did speak about potable water consumption, and you could see some of the trends as they had emerged over the last few years. Also, dust emission exceedances. So, many of our tailings facilities, the tailings storage facilities, as well as our reclamation sites, are in close proximity of where people live. So, we have close to 300 air quality monitoring points scattered across the landscape in the Vitvartis run to learn, and that is where we check whether or not dust coming off our facilities and off our sites, whether they fall within the statutory thresholds and whether they in any way contribute towards a reduction in quality of life of those people living in the vicinity of those. It is part of the geospatial reality of Johannesburg, where certain segments of of society where certain communities were placed and where they lived. And the reality is that many of the disenfranchised communities in South Africa are those that live firstly downwind of these facilities and in many instances also in close proximity. So very few things impact quality of life as much as the standard of containment that's maintained on these facilities and that's a good number 0.5 percent of exceedances is a very very good number so one of the most complex numbers that we deal with or set of numbers that we deal with internally is reporting on electricity consumption on savings on electricity etc etc so we try to reduce those to a few easily understandable headline numbers you want to go into any deeper detail then you'll have to go through the financial statements in order to decipher it from there but what we've decided to do was to give you sort of headlines of just the impact of the solar farm now that it's been implemented over time. So the solar power produced this year, it's 146 gigawatt of power units that's been produced. And that is now net of grid losses and net of efficiency losses. Actually, a high number of what's actually been produced, but that is what was available for use or that was used within our facilities within the group. Electricity consumption after wheeling and offsetting, so that is the electricity that Eskom supplied into our group. That's the 260 gigawatts of electricity that Eskom supplied into the group. So if you add those two numbers together you can get some sort of a sense of what the total draw of DRD Gold was for the year or roundabout. So, the ESCOMM units that were necessary to produce one tonne of material, to treat and not produce a tonne of product, but to treat a tonne of material, that's in the next line. And you can see that that's a very healthy trend. So, in 2024, 13.6 kilowatt hours were required to treat one ton of material. That is ESCIM generated and supplied kilowatt hours. This year, on a group basis, that number reduced to 8.6 kilowatt hours. So if you do the numbers, and if you limit those numbers to Ergo in particular, you'll see that we actually got very close to the range that we guided when the solar farm was in construction phase of a saving per tonne of between R9 and R15, and it looks as though it's somewhere between R13.50 and R14.50 per tonne saving at ergo. That is a number that pertains to ergo itself. But there are a number of movable parts here. So an exact number is very hard to say, simply because we're talking about different rates that's being charged by ergo. So if you look at direct savings, you're also looking at different times of the day, and a variety of other moving parts wheeling and offsetting charges etc etc but that sort of are the headline numbers the solar gave us 146 gigawatt that was used escom gave us 216 that was the the net number from escom and the trend and of course you've got your scope 2 carbon emissions and i did mention that earlier as well how that's reduced over this period so on the whole i think considering that we are a company that proclaims to have committed to the ideas of sustainable development, of generating value at different levels or multi-dimensional value but integrated. I think this gives a very good idea of how your environmental dividend and your financial dividend or your financial return go close hand in hand if you do this properly, if you plan it properly and if you execute well on it. So on the social performance side as well or the social capital side i mean this is very much it's not a story of impact quite yet but our team's working on the impact of the social capital programs that our company is involved in but just on the numbers this year let's see where the socio-economic development number has landed and these are initiatives directly benefiting communities through small enterprise development and and socio-economic development programs, sustainable livelihoods, and now increasingly also infrastructure. You know, when we kicked off 15, 18, 20 years ago on the social capital road path and setting ourselves goals of what we wanted to do, because of the size of our footprint, we do have the largest footprint, I think, in South Africa. It starts in springs, maybe even further, and it ends in Carltonville, the most densely populated part of South Africa. You simply cannot be everything to everyone. You have got to be mindful of not only what you want to do, but also what your capacity is, what you can deliver and still impact as many lives as possible. So for a very large part of that whole program, our social initiatives were aimed primarily at poverty alleviation and youth education. And then in terms of poverty alleviation, providing knowledge and a nudge, small capital nudge here and there, to assist people to sort of trade themselves out of abject poverty and improve their own quality of life. So it was, these were programs that provided knowledge, material to self-empower. Now we are getting to a point where we are actually, and I used to say in those days, Anglo-American builds infrastructure, we do knowledge in a nudge. Now we are getting to a stage where the RD is also starting to build infrastructure. And next year, there is a clinic that is being planned, there is a refurbishment of a school that is being planned, and these These are big numbers that are being committed, and they're worth spending, because every life that's changed provides just that tiny bit more of social stability in the areas where we operate, and you need a socially stable environment within which to operate the business successfully. We believe that, and I'll continue to believe that for as long as I'm around. Then in terms of share price movement, I think what has been encouraging in terms of share price movement in the more recent past, the last 24 to 18 months, it does seem as though the lag that we'd experienced in 2024 when we were talking about all of these big programs and the production numbers were simply not there, it does look as though that lag has has been reduced and maybe it's not there at all we are tracking the the uh the other members in our industry we're tracking our peers and our peers are tracking the gold price like like most of us do so it's definitely showing um signs of having stabilized and hopefully that is something to do with maybe slightly more confidence in the performance of the business and also um restoring a measure of credibility in terms of delivering and delivering on these big projects. And I did show you the numbers earlier on, and it's been part of our narrative now for the last few years of how we believe setting up all of this infrastructure, spending all of this capital will set us up in terms of net cash flow. And our company hasn't changed its value proposition or what it seeks to deliver in terms of its value proposition. Dividend flow is still a very big part of that. And we do hope that if things remain more or less the same, if we can contain costs, if we can drive those throughput numbers and production numbers, and if the gold price doesn't weaken significantly, that once this capital phase is over, the net cash flow profile of this company could look considerably more attractive. And hopefully that will also then reward those shareholders who got their timing right and that remained supportive of the stock. If you sold shares in March, you would have been paid 60 Rand a share if you got your timing right, and I think some of you may have, and maybe those were shares that you bought for 8 Rand, or 15 Rand, or 25 Rand, so it is a stock that does reward very significantly if you understand the dynamics that drive the performance of the stock. And hopefully in terms of a production delivery and future investment perspective, we could give you some material to work with, then you need to go and do your numbers with regards to gold price performance and so forth. And the one undertaking that I do give is that for as long as we can, we will remain unhedged and we will provide you full exposure to movements in the gold price so that you can trade the stock on either side of the cycle. Right, so then in terms of looking ahead, I can't get enough of this picture. It is just such an impressive piece of engineering, and it is enormous. The scale is not fully appreciated by just looking at the picture, but just in terms of 2027 guidance, and we did try to be realistic in terms of our guidance. it is obviously quite a bit more than what it was last year and not all of that is to do with the increase in volume throughput. There are some of these guidance numbers that also pertain to the materials that Ergo is going to be mining for the year going forward. So we are guiding between 160,000 and 170,000 ounces for the financial year and again the assumption premised on volume throughput and on head grade and on a particular standard of recovery efficiency. Cash costs, just over a million rand a kilo, all in sustaining costs, 1.2 million, and then planned capital reinvestment into infrastructure, excuse me, of just over 3 billion rand for the year. Important milestones for us, Yaku spoke about some of those but important milestones for us obviously is the completion of the dp2 plant expansion and that's just about ready to happen we have a board meeting in october and the intention is to take the board members to that plant and to show them a plant that is completed and that at that stage that particular section the new section to be close to operational if not operational, so that the service of the existing circuit, that that can take place, that we can have two virtually new sections up and running and ready to accommodate the 1.3 million ton a month throughput that's in usage for Far West Gold from next year onwards. It's important that we complete RTSF or beneficial occupation and if you want to have a better understanding of what beneficial occupation means please just run through the presentation that we did in july it'll give you some sort of an indication as to where it needs to be it doesn't have to be the dam doesn't have to be finished the facility doesn't have to be finished in order to do that it's going to be sort of two-thirds finished and more or less where yucca is now but there's some odds and ends that we still need to to take care of there are a few regulatory hoops that we need to jump through so beneficial occupation is a technical term that basically means that we are now ready to start impounding material onto that facility and a big part of that initially will be the successful uh commissioning it's a it's a complex process one that we need to get right as you said you're not going to be taking shortcuts now on a facility that's supposed to last for 35 years commissioning of the libanon reclamation station i was so relieved when we got the water usage license for the Lebanon reclamation station. And there were a number of, not just our own colleagues, but also individuals working at the Department of Water and Sanitation that I know pulled out the stops to facilitate this. They knew that it was on the critical path. They were sensitive to the fact that there was a lot at stake and they came in and they made sure that we got this, hopefully in time to deliver to the expectation that we've created with regards to 1.2 million tonnes a month in financial 2028. Obtaining the relevant approvals to commence construction at Bithok, we spoke about the complexity associated with that site, the fact that there's some underground geological features that we need to look into that need to be insulated from the facility over and above the liner that's going to go in, some of the design complexities as well, especially where the two dams abut, where Vitalk abuts the Brackband Tailings Facility. It's not a simple process and therefore we've built in some additional time to do that. It's not going to meet the 2028 timeline that we had aspired towards when we first set out with us. The initial gap, the initial hole in the volume throughput though we explained through until 2029 when Vitalk comes online is 150 000 tons per month. So it's a relatively modest impact in the near term it's essential though that this dam is built by 2029 because that 320 or rather 310 million tons of capacity that it provides is very important for the remainder of ergo's life of mine and then of course we also want to continue to explore opportunities for growth beyond south africa and this is something that we have been talking about and there are there are companies that we've had conversations with to see whether our model is appropriate for what they have left on their side. With the margins that our model has been generating and other companies have been managing to also achieve, I think a lot of the focus on tailings tree treatment has sort of moved away from the impact that it has from a sustainability perspective from a mine closure and an environmental restoration perspective to commercial aspects. And then I think there's a lot of expectation and maybe even some political maneuvering with regards to legislation and so forth, that's starting to overemphasize the commercial aspect. However, things have changed in the world in the last 30, 40 odd years. The standards that we insist upon in terms of environmental closure, in terms of restoration of mining footprints, in terms of biodiversity and the restoration of ecosystems, those standards have changed and corporates are giving undertakings, they're making promises in that regard. promises that are going to have to be fulfilled with money that did not form part of the initial modeling and that's really where tailings retreatment hits the sweet spot tailings retreatment is that part of your business that latent value that's remained ignored for many many years or unrecognized that can now kick in and that can deliver into that without eroding shareholder return or the expectation of shareholder return that is the essence of dating's retreatment yes it's nice to have these super profits yes it's nice to have all of these programs but essentially what's happening here is a profitable sustainable restoration of a poor legacy and that's something that needs to take place globally on a global scale and it's worth doing it because it has become a compelling financial proposition as well seven years ago sabanya stalwater had a project that they spoke about in the far west land if however you looked for financial reporting on that project the only evidence that you would have found would have been the 250 million provision in their balance sheet and environmental provisions in other words a cost a liability today seven years later subanya after having merged that project into drd gold owns a 15 billion rand asset that's the value of their shares in drd gold so that they've gone from 250 million negative or 300 million negative to 15 billion positive in terms of the value of the equity of their company they have earned or they will have earned after this dividend that's declared today in the last two years 955 million rand in dividends from their 50.1 interest in drd gold that's the value proposition that drd gold can bring to your business to your waste you want to do it yourself carry on you want to achieve success in this sort of adventure or endeavor let us through the front door maybe we could do something with your tails that's our story where i will be taking sorry that was maybe a little bit of a cheeky note to end it on but anyway we'll take questions now if you guys want to join in questions in the room so please raise your hand and then state your name and

Speaker 5

a gentleman will bring a mic to you and then once the questions in the room are done we'll go to the online questions please and i do believe that god is the world leader in terms of what it's doing and i just wanted to just state that you know the one aspect that you said that you're tracking the sa gold companies and that to me is what is my statement is that i don't really understand that because you have no geological risk like they do so yes gold price is a proxy and it's going to follow gold but to be trading at a discount to your peers that have so many more risks from a geological point of view is just something I don't understand. But for me, it is really well done, guys. And it's so good to see that there is life in the South African gold industry through people like yourself.

Thank you very much. We appreciate that.

And look, I'm not going to try and explain the performance of the stock. Desmayer is an expert. He's been doing it for 60 years. He would be able to maybe explain those trends. But the fact is, there does seem to be a correlation and we don't want to lag.

I think that's the main thing and we were lagging for a period of time and we seem to have overcome that it is tracking the industry a little bit more closely but thank you very much for your kind words hopefully we uh we can continue to deliver delivering to those expectations it's a long way down mr daffel welcome thank you uh yeah for previous cfo and chel um yeah from my personal point of view um just considering the significant capital expenditure uh substantial contribution to the fiscus and a very healthy uh 50 cents interim dividend i just want to comment relative to the final dividend of 40 cents last year the one rent 20 is definitely not a stingy dividend so thank you very much for that so just a comment and well done with the results that's brilliant Thank you, Rian.

Look, and a lot of thinking went into that dividend, because what you obviously don't want to do is be silly about the dividend that you pay, because next year you're hopefully declaring another dividend. And do you really then want to have a sort of a 40% drop on your dividend? And do you have to go to, I mean, thank you very much NetBank for this facility, but you don't need to draw against it, you don't, you shouldn't want to draw against it. So we did put a lot of thinking into that in order for it to be a responsible dividend in the circumstances. And then, by the way, just on the point of tax, and you've given me the opportunity to do that, you know, it's one of my favorite topics as a proud taxpayer. So it's not only the 490 million in income tax, was it 490 million in income tax? There's also the 312 million rand in pays you earn. So it was close on 800 million paid in taxes. And that doesn't take into account that's in taxes and VAT that was paid this year. So I think there was probably a contribution towards fiscus in excess of a billion rand this year out of our operations.

Martin Kramer Analyst — Journalist, Mining Weekly

Martin Kramer from Mining Weekly. You said you've got a greater ambition when it comes to renewable energy. What is that ambition? What do you see as the final part of it. And secondly, there's platinum group metal tailings around the place. There's an opportunity in platinum, is there not? Have you really studied that to the full? How far are you from doing something with regard to platinum?

Yeah, certainly. No, thank you, Martin. In terms of additional renewables, Jaku worked on a program, you saw the 145 million asset for sale. So, he worked on a project, and in fact, the team took it to licensing, to the point where they can start constructing. And we sold it, but we locked in a number of units, 30 megawatt. So, we got a 30 megawatt facility coming our way through the grid in a few years from now. So, hopefully that will, with the additional power that is going to be used at far west, it will have the impact or the effect that our carbon footprint doesn't grow in size because of more power from ESCO. And look, the power station, I'm trying to encourage somebody. I'm the main cheerleader when it comes to maybe more investment into solar. I think my team is still recovering from the previous process, but I think there's opportunity to. We've got this fantastic expertise in the group. I think we should take advantage of it. I don't know if we should only earn only one solar farm, maybe we should earn more than one. But yeah, I'm not getting a fully supported from the team on that one just yet. What was, sorry, what was, oh, they're on the Platinum. It's really up to, I mean, obviously the obvious partner for Platinum would be Subanya Stillwater, and it would be entirely up to them to invite us into the room. There was planning done a long time ago on that and we do know that there is plenty of opportunity, multi-billion rand NPV opportunities in that regard. I don't think we will buy anything but there is no reason why we can't participate technically and maybe get paid a fee as a member of the group. So, the opportunity is there and it will be a case of Sabanya inviting us into the room. There is a lot of work happening in Sabanya in terms of tightening up on the asset portfolio and I know that there's a program and they'll talk about that. I'm sure that they do talk about that, spoke about that at their markets, capital markets day as well. So it's a big company with a lot of moving parts and everything has its turn and everything has a priority and I'll be very surprised if we're not involved in that conversation.

Operator

Okay, we're going to take some questions.

Camilla sorry there's another question, sorry my name is john kransdor what what about uranium is there an opportunity i think uranium will be the next ceo's sort of focus area so i'll tell you exactly why when when uranium became a thing many years ago when um Who was it? Outfit out at Mine Waste, Gordon Miller and then, REND Uranium. That wasn't REND Uranium, it was Mine Waste Solutions. Remember that Mine Waste Solutions was going to be a Uranium, primarily Uranium and they raised a whole lot of money, 125 million Canadian dollars, sold their gold ford, sold their gold, $400 an ounce in order to fund a Uranium circuit. I want to go and see a gentleman who worked at Ariba called Daniel Vooters, and he will forgive me for reminding him of this conversation, but I think he was right, and said to him, listen, everyone is doing all this uranium stuff with tailings, and I am feeling, you know, am I the only idiot in the room, not wanting to pursue that because we have the largest tailings portfolio? And he said, whatever you do, don't do tailings and uranium, don't do a dual product stream in terms of tailings, focus, because you will favour the one at the cost of the other. So, you are going to be producing lots of Uranium but not much Gold, at the cost of your Gold efficiency, or you are going to be producing a lot of Gold but at the cost of your Uranium efficiency. They are not happy partners in the same circuit. That is in terms of secondary mining. Primary mining is obviously the opposite. So, I have a bias when it comes to Uranium from tailings and there is going to have to be a very compelling argument made by my colleagues here to justify or motivate large quantity you know large capital amounts to build a potato uranium circuit in as part of our current throughput profile not a fan if i can expand on that yes please do you so you write the the two processes on the opposite side of the ph scale so uranium recovery happens in the acidic side of things where you're leaching it with sulfuric acid

Yaku COO

and gold obviously happens in the alkaline stage right up at a pH of 10 and a half so it's exactly what Neil is saying you're going to sacrifice one for the other to do that recovery ergo did that pretty sure I think about before 2000s ergo treated uranium and gold stopped it for that reason. Mineway Solutions did the exact same. Also treated Uranium and Gold, and at a point in time, stopped doing that because you sacrificed one for the other.

So, sorry, is there no new technology? No, unfortunately not at this point in time, no. So, if you look at our average yield, the second, the very, the third slide, our very first third slide, and it's important that we, because we quote these numbers and we, has become so much part of our language that we don't really appreciate exactly what they mean. I mean, look at that number there. Where is the recovery? Yeah, look at that, 193. There's a reason why we say 0.193 gramata, very good reason. And if that was 0.183, you multiply that by 3 million, that's 30 kilos gold, that's 60 million rands of revenue that you lose because you got that second digit wrong. So your uranium has got to give you an additional 60 million rand in net profit in order to justify sacrificing 0.01 gram of gold production.

Martin Kramer Analyst — Journalist, Mining Weekly

That resource doesn't exist, not in South Africa, not at these throughput I just want to harp on what the Minerals Council of South Africa and a whole group of individuals have been saying. South Africa is falling behind the rest of the world when modernization of technology is involved. I can't see that quite happening with you guys on the operational side, because there are so few people that do what you do. But there was a clear picture that they painted that some of the main jurisdictions in the world were ahead of us, and that we're quite badly behind on the modernization front. Have you people looked at that? Are there any ways you can do things better? Of course, this AI crops up all the time, but how you use that is important. Most of the time when they explain the use of it, in this concert when they discussed the modernization was that it was creating jobs rather than actually diminishing jobs particularly in the operational front but i don't know whether there is any modernization mechanism that you can bring in that would help matters would you think you've reached the stage of modernization that is needed in terms of digitization and and using ai and so forth.

I think AI is a very helpful tool to better understand data. AI shouldn't be a decision making tool, it should be an analytical tool, something that you use to understand more data better in order to inform your decision making. So, I would be very reluctant for people to sort of just mechanically follow numbers on the screen and then say, all right, well, AI is saying I must do this, that and the following. It is important that people understand what it is that they are dealing with because if things go wrong, AI is not going to fix it for you. You need to understand your process and you need to be able to do it yourself. I think in terms of big data, we have been doing big data in any event now for the last 15 years to track and understand and maintain in stable state the throughput rates that we are doing. We are separating out 200 parts per billion. You do need big data and that is being reported on an ongoing playing basis. With regards to new technologies, the UFR, the upflow reactor, could be part of that cracking the code and making that small incremental change. And there is never not any kind of, some kind of rather research happening, it is just being able to scale it. So that process will never end, it will continue. I mean, we are still putting back 0.17, 0.18, 0.15 gram of gold per tonne. We are still putting back onto our tailings in some instances a little bit more. At some point or another, there might be a different kind of process. You can actually probably extract what is remaining there as well. So it is a never ending endeavour. But we are excited about the upflow reactor. It is showing good promise. It increases your, it reduces your residue. Great. So it's one more pass. So once it's gone through CIL, it goes into the upflow reactor. And then there's some more adsorption taking place. Well, we did pilot scale. I think what we don't want to do is create expectations and say we believe it's going to give us this, that and the following. But even on a conservative interpretation, we're committing a lot of money and we're doing it because we think that technology works. Just before you start modeling it, we want to give you proper numbers before you start bringing it into a model.

Operator

We're going to go to the online questions. Arnold van Ghoran asks, Neil, is it fair to say you're keen to see Vision 2028 through to delivery? And how do you think about leadership continuity a T beyond that point.

Sure, I would love to, everyone in this room who works for DRD is younger than 40, can you put up your hand please? All right, so there you see it, a lot of young people working for the company and I mean there are a lot of smart people already being positioned for the next generation of management, so So, I am confident that we have got the depth within the company to deal with both a crisis scenario and also with a managed and structured scenario.

Operator

Okay. Nick Dillum, he says, Neil, are you pointing to a change in operating plans at Ergo with more reliance on trucked high-grade ore for the foreseeable future and where is this coming from and how and for how long will this go on so so what we're pointing towards is not a change the opposite of change there will still be tracking going on for the foreseeable future but not an increase in tracking and then nick dunham asked another question the deadline for approval of the took approaches if no approval by december can you give us a sense of how you'll play the uncertainty into your revised plans we will just have to camp out and bang on the door

Yaku COO

and say listen can we please have it like we did with some of the other licenses yes sir so you want to comment on that so yeah it's important that we do get to that timeline if we don't the backup plans would be that's why we've implemented the half on time so the half on time takes the um 750 000 off um the brakman tailings dam um we've got a bit of leeway in that process but it's important that we do hit that end-of-year timeline, but it's not an undidumpty fall-of-the-wall exercise. We do have some additional capacity.

So, if BITOG doesn't come online in 2030, then it means until it does, Ugo would have to be running at somewhere between 750 and a million tons a month. So, you'll shave another 650 off its volume profile. not ideal, but as Yaku is saying, it's not existential, just annoying and inconvenience, and it's going to cost money.

Operator

And then Mark Dutoy asks, well done on the great results. Could you expand on your capital allocation policy? What dividend payout can we expect going forward? And then two, what is the expected benefits from APLO reactors costing 880 million in CapEx?

Okay, so if we, as the capital reduces and provided everything stays the same, the dividend will grow. Simple as that. And that's why we include the capital profile.

Operator

And Lebu Moffa King asks, well, says, well done, guys. Please guide on AISC and AIC for financial year 28 and financial year 29, unit cash costs as well. Can you also guide on running CAPEX number post vision 2028. No, I don't think.

I don't think we give guidance on those numbers that far into the future. There are just too many assumptions that we don't control. I mean, you could extrapolate them more or less and form a view on the assumptions, the veracity of the assumptions that we use for our guidance, but I don't think we can do 28 and 29 all in sustaining cost guidance. CAPEX guidance is there. I mean, and that's pretty much as far as I think we prepared to go.

Operator

Yeah, Andre Pieters, your expectations, what are your expectations of cash tax versus accounting tax going forward?

Oh gosh, somebody needs to explain to me what that is, so why don't you want to take that one in there?

Henriette CFO

So again, on the income tax side, so deferred tax will keep on growing from a cash flow point of view, our income tax balance will keep continue growing as well in the foreseeable future. We still have a big capital balance for Far West, for instance, for the year ahead, but if the gold price performs in line with what it's performed with in the past, even Far West can go into a taxpaying position during the next financial year. Ergo will definitely still be, even with the planned capital spend on the vertex side, they will continue to be in the DAX buying position next year.

I think I'm correct in saying that with the solar less than two years ago, solar less than two years ago, and recognising 125% of capital for a second, it's gone, it's been expended. So it disappears very, very quickly in this sort of margin, gold price margin environment. And look, I think it's important that that number is out there because sometimes the contribution of the industry, of all the South Africa and the mining industry, is understood in terms of social and labour plans, only in terms of social and labour plans, or some sort of equity participation thing, and so forth, and so forth. Somehow we ignore, or we don't really spend enough time reflecting on the physical contribution, the contribution in taxes that this industry is making, and something that I think, I'm surprised that there's not more awareness amongst communities affected by mining industry. You see, and I just mentioned a billion rand in tax. The sad reality is that we see very little evidence of any of that billion rand finding its way back into our surrounding communities. If you look at the kind of services that's been provided there, at the kind of help assistance that our company needs to provide in order just for basic things to be delivered into those communities. And I really think that as much as we look at the social contribution of mining companies in the context of regulation and so forth, maybe from time to time, we also need to reflect at just how efficiently tax revenues are being reinvested into constituencies. As a percentage of our contribution into the fiscus, we're seeing very little of that being plowed back into our communities, into the areas where we operate, very little.

Operator

Thank you. Which is wrong. Dinewa Faku asks, Good morning. Can you say where outside South Africa you are looking to expand?

Yes, we're looking at Africa and South America.

Operator

Herbert Karibe says, Is diesel a meaningful input in your production process?

Cool.

Henriette CFO

So yes, we do at this stage, I've got lots of yellow machine hire. If you look the massive projects that we are undertaking on the RTSF. Kevin, how many yellow machines are on RTSF at this stage? So 167, 200 big pieces of equipment currently running at RTSF. On the operational side, from a cleanup operation, all of the cleanup sites, we use lots of machine higher, and then the trucking expenses. Biggest portion of that is a diesel component. So yes, diesel is impacting us quite substantially, especially on the ergo side, less of an extent at this stage on the four-way school recovery side.

Operator

I think that leads Matthew Whitelaw to his question.

Henriette CFO

What price have you assumed for diesel in your financial year 27 cost guidance? so look we have done you've seen that the diesel price has gone up and it has gone down and so we have built in the latest information that we've got and we built in some risk factors so you're going to always have things that is directly impacted from a diesel point of view of diesel usage versus your deliveries that was more expensive etc so so we have brought in some risk factors into our budgeting process, but it was an interesting year to budget.

What's that range between 11 and 17 percent risk factor on some of the components? That's part of a composite.

Operator

Perfect. I think some of the other questions are a little bit more detailed which we'll take time to respond after the session.

Okay, thank you very much everyone for joining us and we really appreciate your attendance Please join us for some snacks.