Skip to main content
TITAGARH 737.1500 INR +0.80%
TITAGARH · TITAGARH RAIL SYSTEMS LIMITED
737.15 INR +5.85 (+0.80%) At close · Nov 13
Market Cap
99.27B INR
Shares
134.67M
Volume · Nov 13 553.55K Avg daily vol (3M) 641.7K
All webcasts

Earnings call · FY2026 Q4

TITAGARH RAIL SYSTEMS LIMITED (TITAGARH) Q4 2026 Earnings Call Transcript

Concluded Jun 1, 2026 Audio replay Verified speakers
Jun 1, 2026 56:53 112 turns
Period
FY2026 Q4
Runtime
56:53
Sources
2 artifacts
Revenue 8.75B INR -12.9% YoY
Diluted EPS 3.97 INR/shares -16.9% YoY
Net income 535.00M INR -17% YoY

Transcript & audio

Verified speakers 56:53 Audio
Operator

Ladies and gentlemen, good day and welcome to Tittagra Rail Systems Limited Q4 and FI26 earnings conference call. As a reminder, all participant lines will be in the listen-only mode, and there will be an opportunity for you to ask questions after the presentation concludes. Should you need assistance during this conference call, please signal an operator by pressing star and zero on your touch-tone phone. Please note that this conference is being recorded. In our hand, the conference over to Mr. Umesh Chaudhary, Vice Chairman and Managing Director, Sita Agra Rail Systems Limited. Thank you, and over to you, sir.

Umesh Chaudhary Chairman

Thank you very much. Very good afternoon to everybody, and a warm welcome to our Q4, FI26, and Financial Year FI26 on this call. I will probably just start off with a few highlights for the year and for the quarter, and then happy to take any questions that might be there. As you would have seen from the results that have been declared, I would like to first... Start off by informing everybody that we have finally been able to completely exit our investment in Pirama. Pirama has been very strategic as an investment to us because pursuant to that acquisition, we were able to start our passenger rail systems business. However, that part of the strategy was already fulfilled, and Phirama continued to be both drain on our consolidated balance sheet, or P&L, as well as on cash flow. Because of continuous cash needs on account of the losses that it was incurring. With this investment and acquisition of Pirema by the Italian State Railway, we have now been able to put a full stop to that. And all the past and potential liabilities that Kirema might, our company might have with respect to the Kirema transaction, everything has been provided for in the balance sheet of the financials of the company. And there will be no further... Losses or reliabilities that we expect in regard to Phirana. Apart from that, the other big highlight for the year has been that the Tidagar Naval System, the shipbuilding business, that was already informed in the past that it's a sunrise sector and we would like to pursue this business without Disturbing the existing business of the rail systems. So, we have segregated the height of the shipbuilding business into a wholly owned subsidiary. The subsidiary, which is called Pitagar Naval Systems Limited, has acquired land in Falta, which is in the south side of West Bengal. And has also taken on leads, on long-term leads, an existing concrete jetty, which was next to the land, that has enabled the company to be able to start. The construction activity and we will be able to start production activity for ships in the new land in a short period of time. Within the current financial year, we expect that we should be able to start production in the Teetagar Naval Systems Alta Shipyard. This company has also been one of the first companies to be recognized and approved under the Shipbuilding Assistance Scheme and has been sanctioned capital subsidy for its investment to the tune of 25% by the government of India. The third highlight of the quarter of the year has been that this year has marked the highest ever turnover and profitability for our passenger aid system business. As I have always mentioned, the wagon business, the freight rail system business, is more of an autopilot business or a cruising altitude business, if I can call it, wherein in a good year, we will be able to get to 1,000 wagons a month if there are orders which get placed, and I will speak more about it as we go along in terms of the recent newspaper reports. Of course, we do not have any way of confirming or denying them right now, but we are very sure that considering the growth trajectory that the Indian economy has, wagon requirement is bound to be there, whether it is a matter of a few quarters here or a few quarters there, but wagon demand will be there on a sustained basis is what our conviction is. Thank you. So, irrespective of what we have planned now is for the current year, we should be able to stay at a run rate which is higher than what we have produced last year. So, there will be a growth in the freight business. But on the passenger side, we would definitely be able to scale up much faster, and we had given a strategic plan that we would do between 100 to 120 coaches in FI26. While we have not been able to achieve that target, we have increased the sales from 12 cars in FI25 to 63 cars in FI26, and we are extremely confident of being able to get to 200 cars in FI27. The order book also is quite reflective of this growth trajectory on a standalone basis without considering the share of the joint venture. Our order book for the passenger rail segment is about 10,600 crores, whereas the freight rail segment is 3,100 crores, which signifies the trajectory in which the passenger rail segment has the potential to go. Our overall order book, including our share of the joint ventures and subsidiary, is at about 27,540. The other highlights that we have for the quarter is in order to enhance our... Product offering to private sector, we have been able to get the wagon leasing license, and we have received our first contract, or we have signed our first contract for wagon leasing, and we believe that going forward, we will have a healthy mix of the three segments of wagon orders. One will be from the railway themselves, the second is from the private sector, and the third is what wagons we offer on lease. We have been also expecting or we've been hearing that the wagon maintenance policy should be announced soon. The wagon leasing business and the wagon maintenance business, once it is done, we believe will be a good addition to our freight business on the whole. So, these have been a few of the highlights. So, the last point is on the trade side, we have already completed our capacity and technology enhancement for the foundry. We have installed resin-based molding facilities in both our foundries, and now the foundries are fully capable of increasing its production and meeting the entire casting demand at full capacity of our wagon production. Of course, we are waiting for the large tenders to be finalized so that we can also go for the power enhancement, power connectivity enhancement, etc. But once there is visibility on the orders, we will be able to ramp up the production in the foundry to be able to produce cartings for the 1,000 wagons a month. The last point that I would like to mention, the last highlight, is during the year, we have also executed orders for dedicated freight corridor corporations through Mitsui Japan. These are specialized wagons, which are hydraulically and pneumatically operated ballast discharge wagons. These are high-tech wagons, if I may say so. So that also marks our entry into certain higher end of wagons, which we believe that with the new technology that is being continuously implemented by the railways, the railways would also like to more and more go into higher technology wagons, and we will be able to cater to that demand as well. So, these are the highlights that I would like to mention. All of them will be put into the Inverture presentation that will be uploaded after the call. And I'm happy to take any questions that might come up.

Operator

Thank you very much. We will now begin with the question and answer session. Anyone who wishes to ask a question may press star and 1 on their touchstone telephone. If you wish to remove yourself from the question queue, you may press star and 2. Participants are requested to use handsets while asking a question. Ladies and gentlemen, we will wait for a moment while the question queue assembles.

Operator

First question is from the line of Balasubramanjan, from Arihant Capital.

Operator

Please go ahead.

Bala Subramanian Analyst — Arihant Capital

Good evening, sir. Thank you so much for the opportunity. Sir, on the passenger rolling stock side, we have achieved 19% equity margin in Q4 F826. On the full year basis, we have achieved 14.3%. I think our long-term guidance is 15%, but we have reached within a year itself. So, I think we have to do a lot of work on the passport integrations. We go to reiterate on the margin side for rolling stocks and packing the rolling side. And we have crossed nearly 500 crores plus in this year. And if I'm taking 120 vacants or 200 vacants by next year. It's like the growth rate is coming nearly 1,500 plus crore in FI 27. We could, like, how we are going to execute that kind of jump in this financial year.

Umesh Chaudhary Chairman

So, thank you for your questions. Let me explain two, three aspects of your question. One is as far as the margin profile is concerned. We have always guided that passenger rail system, we should be able to get similar margins as we have been able to get in freight rail systems, which is at around 12%. Which will get further enhanced when we are able to backward integrate and use our own propulsion, which is still about maybe a couple of years from now. It is also a matter of volumes that the margins will improve because the operating leverage in this business is going to be quite high as the fixed cost of this business is very, very high. Just to give an example, we have almost 150 people working in design, engineering, and R&D, and these are all highly skilled people that are working in the passenger rail system for only design, engineering, and R&D. So that can give an indication of what kind of operating leverage. Play will be there in the passenger aid system. The margin in the current quarter has been higher because we are also executing a contract for Bangalore Metro, wherein the material does not come into the top line as the material is a free supply item. Therefore, the EBITDA margin goes up in that contract, and as a result of that, the EBITDA percentage margin during the Q4 of this year as the execution of the Bangalore Metro was higher. Thank you very much.

Bala Subramanian Analyst — Arihant Capital

So, my second question on the JV for Gillesets, the JV partner mentioned on the con-call, it will be starting by end of May or June. If you could reiterate where we are now and how we can expect ramp-up for the Gillesets plant.

Umesh Chaudhary Chairman

So, the position remains exactly what our JV partner Ramakrishna had mentioned in their call. We are expecting to start a production in this quarter, that is in June, and we are again confident that the ramp-up plan that is there will be fully achieved. We have a contract of 80,000 wheels per annum from the railways, which is valid for the next 20 years. We have our own requirement. Plus, there is opportunity to export wheels and to sell it to other players. So, there will be a healthy requirement that will be there for the wheels and wheel sales.

Bala Subramanian Analyst — Arihant Capital

Yes, sir. So, my last question. Are there supply chain, disruption, fire, I think...

Operator

Sorry to interrupt. Can you speak louder, please?

Bala Subramanian Analyst — Arihant Capital

Sir, on the supply chain disruption side, which are the specific materials or gas we have faced and how we are mitigating?

Umesh Chaudhary Chairman

The supply chain constraint you are speaking about, sir? Yes, sir. Yes, sir. Yeah, so supply chain constraint, what we have faced is nothing different from all the industries that they have faced. We have faced supply chain constraints for gas, for LDO, and also our suppliers have faced these supply chain constraints. So there have been delays in C supplies in cases, component supply in cases. So these are standard. Now the situation is much better. I think the government of India has been able to negotiate international deals in order to improve the situation substantially. The situation remains, I would say, we are watchful of the situation, but we believe that should not impact too much on our targets for the year.

Bala Subramanian Analyst — Arihant Capital

Got it, sir. Thank you.

Umesh Chaudhary Chairman

Of course, I would also hope that this situation of West Asia comes to an end. So that's something we all continue to hope.

Bala Subramanian Analyst — Arihant Capital

Yeah, thank you, sir.

Operator

Thank you. Next question is from Lain Varad Jain, individual investor. Please go ahead.

Virat Jain Analyst — Individual Investor

Hello, sir. Thank you. Thank you for the opportunity. My question is on this leasing order that you won. Can you give some color around it? How many wagons are we looking to lease? Who is the customer? That is one. And then the follow-up to that is, how do you see this leasing business growing over next two, three years?

Speaker 7

Sorry, I couldn't share your second part of the question, sir. I heard the first part.

Virat Jain Analyst — Individual Investor

How do you see this business growing over the next two, three years, leasing business?

Umesh Chaudhary Chairman

Sure. So, you see, the leasing business that we are doing is more as a product offering as an extension to what business we do. We are not going to do any third-party leasing for wagons made by other people, but this is only an enhancement of product offering that we are offering to our customer. We intend to, this order that we have got was from Parmalori. For two rigs only, but we intend to calibrate our, I mentioned in my opening remarks, the three segments or three outlets of our wagons. One is to the railways, the second is to the private sector, and the third will be on the wagon leasing side. So, on the wagon-leaving side, it's going to be a calibrated offering that we will make only to very, very safe plans where we do not see credit risk coming up. So, I will not be able to give the exact numbers at this point of time because that is something that will evolve, and I would also not like to mention that for competitive reasons, business reasons. But we will be doing it in a calibrated manner that we can, I can say. So, the growth on the leasing business is not going to be the growth from the leasing business, but a growth in the dragon business going to the leasing business.

Virat Jain Analyst — Individual Investor

Okay, okay, that's clear. So the second question, sir, is on this last Raj Railway tender. I mean, any color you can give around this? When can we see this tender? Also, I think you mentioned newspaper article. If you can address that also, whatever comments you have to offer. And do you feel confident that at least the orders will come in next, let's say, three to six months?

Umesh Chaudhary Chairman

See, we cannot speak about the newspaper articles, because that would be improper on our part to do that. What I can only say is that we are very confident that the India story is strong. India is well on its way to become a $5 trillion economy. And in order to do that, the logistics costs of India and the logistics infrastructure of India has to be very robust. And that cannot be achieved. Unless and until the railway network is very robust. I can give you some very, very high-level numbers to support my belief in this. The railways have invested a cumulative of almost 20 lakh crores over the last 8 to 10 years. The government of India has invested in the railways almost 20 lakh crores. Now, in order to get return on that investment of 20 lakh crores, the railways have to grow their business, which effectively is passenger and freight traffic. So, in order to grow the passenger and freight traffic, the last end of the spectrum for investment is the roading swap, both for passenger and freight, which means trains and wagons. So, the current carrying of the railways, which is at about 1.6 billion tons, has been stated to be increased to 3 billion tons by 2040. Now, that may happen by 2030, that may not happen by 2030, and happen in 2031 or 2032. But it will happen, there is no doubt about that. And in order for that to happen, the wagon requirement has to be there. So, to answer your first question based on this, that requirement for wagons will come. There will be a healthy demand for wagons. There can be blips and traps for brief periods of time based on infrastructure readiness or procurement priorities of the government, but on a sustained basis, we see a healthy demand for the wagon, and that's why I said that it is a cruising altitude business. Sometimes we can be, and that's what is given in our strategic plan, that this is a business that will be there in a range-bound manner. Bad years, we can do at the rate of 600 wagons a month. Good years, we will do at the rate of a thousand wagons a month.

Operator

Thank you. We are at our request to come back for a follow-up question. A kind request to all the participants, can you limit yourself to two questions for participants and rejoin for a follow-up? Next question is from the line of Parvyes Kazi from Nuama Group. Please go ahead.

Speaker 3

Hi, good afternoon, sir.

Umesh Chaudhary Chairman

Thanks for getting your attention.

Operator

So, my first question is, would be great if you could give an update about the five major passenger push orders that we have, which is Pandey, Bharat, Kujrat Metro, Mumbai Metro, Pune, and the Gangloor Metro. Thank you.

Umesh Chaudhary Chairman

So, I'll start with Pune. So, again, I think that was a highlight which I missed mentioning in my opening remarks, and thank you for asking this question. So, Pune, we have completed the supply of the first lot of 34 trains, but what is more important is the milestone that bulk of these trains have now completed their defect liability period. So, which means that the provenness of this train is now established, and the second, if I can call it the badge of honor, is that we have received receipt order from Pune Metro for the option quantity of 12 trains. So, being a new entrant into the passenger coach business or the passenger rail segment, let's say five years ago, there were apprehensions on the ability and the capability of the company to be able to establish itself in this business. These are very important milestones or very important benchmarks for conveying that we have been able to establish ourselves, not only complete the order successfully, but complete the defect liability or the warranty period successfully and come out of it. The 12 train orders from Puna that we have got will be, and we have already given it in our press announcement when we got the order, are to be delivered in two years' time from the date of the order, and we'll be ready on our track to do that. Gujarat Metro, we already started the supplies. We have already supplied the first trains, and we are confident of completing this order within this financial year, that is FY27, which is a total of 34 trains for 102 cars. We should be able to complete that within this. As far as Mumbai is concerned, we will start the supply within this financial year, and the execution will happen over the next two financial years for both Line 5 and Line 6. The design approvals are at an advanced stage, and we are planning to start the first car body production in the next quarter, in Q2 of the current financial year, and the train should get delivered in Q4, between Q3 and Q4 of the financial year, the first train. As far as Vande Bharat is concerned, once again, we have said that Q3 of this year, within this financial year, we will be able to deliver the prototype train. We are well on our way to do that. We have already made the first 10 car bodies of the Vande Bharat, and now they are entering into the different stages of outputting and completion. So, we are extremely confident that this financial year, the first trains of Vande Bharat will get delivered. Sir, and when do we expect to complete the Bangor Metro order? Yeah, sorry, Bangor Metro is also something that we will complete within this financial year, maybe spread over to the next quarter, the first quarter of the next financial year. But we are dependent on this order for the supply chain from the third party, as I mentioned a little while ago, that this is the materials are supplied on a free supply basis. So, we use the capacity on a fungible basis between our existing other metros and the Bangalore metro so that we can optimize on production. So, while the contractual delivery provided, we get all the free supply materials on time is within this financial year. We are considering that they can be a spillover by one or two quarters.

Operator

Thank you. Parviz, I'll request to come back for a follow-up question. I request to all the participants kindly limited to questions per participant and rejoin for a follow-up. Next question is from the line of Sandeep Mukherjee from SDP Securities. Please go ahead.

Speaker 3

Yes, sir. Thanks for the opportunity. Sir, some certain bookkeeping numbers I'd like to ask. Sir, what is the pending number of vegans and what is the number of private percentage in that?

Umesh Chaudhary Chairman

So, we do not give the breakup of the private and the government orders, but the total orders we have now are about in the ballpark of 6,500 wagons, and then, of course, we are aggressively pursuing booking of new orders, both from private and from the government sectors, and the leasing one as well.

Speaker 3

Sir, what is the number of wagons produced in this quarter, sir?

Umesh Chaudhary Chairman

In Q4?

Speaker 3

Yes, in Q4 itself.

Umesh Chaudhary Chairman

In Q4, we did about 1700 and odd wagons. This will be a part of the presentation that you will receive in a few minutes.

Speaker 3

Okay, sir. Okay, sir. Thank you.

Operator

Thank you. Next question is from the line of Amai Sarada, from Pondata Investment Advisors. Please go ahead.

Amol Sarada Analyst — Pondata Investment Advisors

Hi, sir. Thank you for the opportunity. Just wanted to understand regarding the restatement that we had for the Italian subsidiary Ferema. Just wanted to know if there is any kind of cash outflow that is also expected for the same.

Umesh Chaudhary Chairman

So, Tirema is now a discontinued business for us, and Tirema business has already been sold to the Italian State Railway, which is Ferrovi dello Stato. And beyond whatever we have already invested or provided for in our books, there is no cash outflow or losses expected in our books with respect to Tirema anymore.

Amol Sarada Analyst — Pondata Investment Advisors

But, like, so, we, basically, the numbers for Firema, the losses, basically, increase, right? So, because of that, is the cash also expected to increase, or, like, that's more like a notional number?

Umesh Chaudhary Chairman

No, that is the loss of Firema's Italian operations. That has nothing to do with the cash flow, or cash requirement of the company, of these other rail systems. Because of those losses, the investment value of the equity shares in the books of Tether Rail Systems has been written down. But those losses that have incurred, have been incurred in Pirema for the previous year, which was FY25, was the reason why the company decided not to put in more money and sell it to the Italian state railways. So, to answer your question in short, that there will be no impact of those losses that have been reported in Pirema any further than what has been already taken in our books and declared, and there is no further losses or cash outflow outside the provision or the loss that has already been booked in our books and declared in the results.

Amol Sarada Analyst — Pondata Investment Advisors

Okay. Understood, sir. And so, my second question was regarding this. So, the freight segment. So, since we have started reporting shipbuilding as a separate segment from the freight segment, because of which the margins have improved for the freight segment, or like it looks improved on the paper. So, does that mean that the current margins will be sustainable for the freight segment? It's around 12%, and we used to report around 11% before that.

Umesh Chaudhary Chairman

So, as we have always mentioned that freight business is business as we have stable margins of 11 to 12 percent, depending on the mix of the private and the public order, the railway order mix of supplies, depending on how the price variation clause and the commodity prices have moved. My request to you would be not to consider on a quarter-to-quarter basis the margins, but to consider it on a longer period, and there the margins are going to continue to be on the same level, which is vicinity of 12%. Some quarters can be half a percent, 1% lower. Some quarters can be half a percent, 1% more. But 12% on a steady-state basis is what we can consider over maybe four, five quarters going forward as well. Unless and until there is a change in the market dynamics, this is where we should stand.

Amol Sarada Analyst — Pondata Investment Advisors

Okay. Understood. And so the last question was... Uh, so, uh, whenever, uh, in the passenger segment, they just wanted to understand, like, once a company, uh, the T-Tagger starts working on a new Metro 10 or a new passenger train segment order, so, like, after producing the first prototype, how much longer time does the company take to basically ramp up the number of, uh, trains? So like once you have delivered the first prototype, if the approval comes then automatically we can ramp it up to two to three trails per month or like it takes some kind of a learning curve to be able to do that.

Umesh Chaudhary Chairman

Normally, you know, there is no steady state answer for different projects. Each project has their own criticality. But what I can answer here is on a general basis, on an average basis, the benchmark is that the learning curve or the time taken, the gestation period is more for the designing and the prototype. Once the prototype is done, of course, there is a learning curve to achieve efficiencies. But the production gets ramped up immediately thereafter. I would not say on the second day of the prototype, but maybe over a period of two to three months of the prototype. And we always balance the production between different projects so that the overall production does not get adversely impacted to a great extent when we move from one project to the other. So you can realize that this is a new business for the company. We are still establishing. It's the first time that we have done record turnover, record margins in this business, which is only, I would say, a sign of things to come in the future. But our objective over the next years is going to be that when we switch over from one project to the other, the disruption in the overall production should be zero or near to zero.

Amol Sarada Analyst — Pondata Investment Advisors

Okay, sir. Understood. Thank you so much. Okay.

Operator

Thanks. Thank you. Next question is from the line of Kush Nahar from Electrum BMS. Please go ahead.

Bala Subramanian Analyst — Arihant Capital

Yeah. Hi, sir. Thank you for the opportunity.

Umesh Chaudhary Chairman

A couple of questions. One, could you elaborate more on the opportunity that we have for the DST, the specialized wagon manufacturing, which is there. So what kind of overall... What target market are we looking at and what are the competitors or players involved in this type of segment?

Operator

Sure.

Umesh Chaudhary Chairman

So, as far as BFC is concerned, you know, we need to see the BFC as a part of the extended network of the wagons, of the railways. So, therefore, you know, you should not see, look at the BFC as a separate part of the railways, which will require completely different wagons. However, there will be, from time to time, special purpose wagons that will be taken. The one that I mentioned about in my opening comments was the special purpose wagon that we have given. Those are some of them required for maintenance purposes or inspection purposes. But the types of competitors are going to be almost the same as we have in other wagons. Wagon business is the competitive landscape does not change from one type of wagon to the other. But in terms of the overall requirement for the DHCC for wagons, I would rather present it differently and say that there will be no separate demand for DHCC on a larger basis. But because of DHCC, the overall demand will increase as the bottlenecks that exist in the Indian Railway Network will get addressed or will get removed. And the overall throughput of the traffic movement of the railways will get enhanced.

Speaker 3

Sir, in terms of the PRF execution, we are able to

Virat Jain Analyst — Individual Investor

get some sense that,

Umesh Chaudhary Chairman

you know, when could we see a similar... Sorry, your voice is not clear. Can you please go off the hands-me mode? Yeah, is it better now?

Bala Subramanian Analyst — Arihant Capital

Yeah, so my question was regarding the passenger rail system. So since now that we have the required capacity in F527,

Operator

what according in which according to you can we see the full potential? This is the current order book that we have in terms of numbers for the PRS segment.

Umesh Chaudhary Chairman

So, we have already given that in our strategic plan that we will be ramping up our production and our capacity and our capability on a year-to-year basis right up to 2030. The years that we personally are watching for are 2028, as 27 is, of course, a very important year. And then, 2020 is going to be the year where Vande Bharat will be in full production and metros will be in full production. And then, continuously, we would expect to continue to ramp up the production up to the targets that we have for FY15.

Operator

All right. Thank you, sir.

Operator

Thank you. Next question is from the line of Rajesh Bhattar. From Nakora Ingeniors, please go ahead.

Speaker 7

Hello. Good evening, sir. Hello. Can you hear me, sir?

Operator

Yeah. Good evening, sir.

Speaker 7

Please go ahead. Yeah. Sir, as you mentioned, we have a total order book of 27,544 crores. That includes order for wheels also?

Umesh Chaudhary Chairman

So, yeah, as I mentioned, that includes our share of the joint venture. So, if we have 49% of the joint venture, then the number that operates 7,540 crores includes 49% of the wheel joint venture that we have. So that's how the number of 27,540 crores on a consolidated level is calculated, including our share of the...

Speaker 7

Yeah. And, sir, as you can see, we have Metro came, Wee's, Nevel, and also in Metro Plus, we have Vande Bharat also. So, now the variety is too good, but turnovers were 25,3822 crores, FY26, 3190 crores. So, what can we expect in FY27, 28 and 29, sir? Approximately.

Umesh Chaudhary Chairman

So, we cannot give you forward-looking projections, sir, but in our strategic plan that is already uploaded on our website, we have mentioned that two businesses that have to be seen separately, the passenger business and the freight business. As I mentioned in the earlier comments also, that our freight business is a steady-state business. We can call it a cruising altitude business, which will be range-bound. The passenger business is the one that will be growing year after year, and in terms of the turnover, If you see that the overall company-wise, the turnover of the passenger business was less than 10% in the FI-25 and has increased to about... Approximately 17% in the 526. And it will continue to increase. And our expectation is that it will follow somewhere the percentages split of the order book in the future, in maybe three to four years or five years span from now.

Speaker 7

In course of time, it can even overtake the wagon turnover also.

Umesh Chaudhary Chairman

Sir, as I mentioned that it will follow the almost, we expect, we expect that in the next 4 to 5 years time, maybe by 5.30, it will be in line of the order book percentages. Today, in terms of the order book percentage, rate is just about 20-25% or 30%, between 20-30% and passenger is about 70%, 70-80%. So, the potential of the passenger business to grow is to the same level that it can be on a standalone basis, 70% of the overall business. When will this reach production start, sir? I already told you before that June has started production.

Speaker 7

Then it will go on full swing? That's right. And Neval, Neval, sir?

Umesh Chaudhary Chairman

Neval, I have also told you, but this year we will start our new production. When, sir? The sound is not clear actually. We will be starting the new yard, the production within this, end of this financial year, in the new year.

Speaker 7

Okay, okay, okay. Yeah, yeah, yeah. So, we can expect in the next two, three years, the turnover will multiply rather. We hope so, sir.

Operator

Thank you, Rajesh. I will request to come back for a follow-up question. Next question is from Anupad Singh from 361 Capital. Please go ahead.

Anupad Singh Analyst — 361 Capital

Thank you so much, sir, for taking the question. First, I just wanted to ask, can you give me a breakdown of wagons that we have dispatched out of the 63 wagons, spirit for project? If that is available?

Umesh Chaudhary Chairman

Sorry, we never do that, sir.

Anupad Singh Analyst — 361 Capital

Okay, and if any outstanding order book or coaches that we are yet to deliver for each project or for business members that is available?

Umesh Chaudhary Chairman

So, we have a total order that we are yet to deliver is about 522 metro coaches and 1,280 one-day bar coaches.

Anupad Singh Analyst — 361 Capital

Okay, that was good. Thank you so much. Sir, will we be releasing a presentation? I don't think I can see the same one.

Umesh Chaudhary Chairman

Yes, we will immediately, during the course of the day-to-day, the presentation will be updated.

Anupad Singh Analyst — 361 Capital

Okay, thank you so much. Those are my questions. Thank you so much.

Umesh Chaudhary Chairman

They will also be addressing some of the questions that come up during the call today.

Operator

Thank you. Next question is from the man of Akash Agarwal, individual investor. Please go ahead.

Speaker 3

Yeah, hi, sir. So, thanks for the opportunity. Just wanted to know this one-day Bharat is getting delayed, you know, month on month, month on month, quarter on quarter.

Umesh Chaudhary Chairman

So, is this now from date that next quarter we'll be able to deliver the prototype? Sir, we never said next quarter, and there have been no delays after the initial delay on Vande Bharat. We have always maintained that the Vande Bharat train will be delivered in the current financial year. The end of Q3 or beginning of Q4 of the year, the initial delays that had taken place were because of the confusion on the 16 to 24 coaches by the railways, and the railways had recognized that and refixed the delivery accordingly to FY27, Q3, or Q4, I do not remember, but that's when we are confident of being able to deliver the trade. So, to clarify, there are no delays from our side on Gande Bharat. We are very well on schedule as per the contract with no imposition of any kind of damages or delays. Sure. So, just a second question, sir. So, once we deliver the prototype, then revenue will recognize in this financial year, right? Then we will start deleting the balance of the trains. We have a total of 80 trains. Each train is of 16 cars, and there is a schedule against which the trains have to be delivered, and that schedule has also been represented in our strategic plan presentation that was uploaded last year, a few months ago. Okay, for sure.

Speaker 3

Thank you so much.

Operator

Thank you. Next question is from the land of Kondi, India, Nimagada, from Jefferies, India. Please go ahead.

Speaker 4

Yeah, hi, sir. Thanks for the opportunity. Just continuing on the previous participants' question, my understanding is that you will be delivering or you are supposed to deliver to Vandibarat trains this year. Is that fair or is there a change in plan out there?

Umesh Chaudhary Chairman

It is absolutely fair. We will be delivering to Vandibarat trains within this financial year.

Speaker 4

And any tentative timelines and any specific quarter where you can flag it to us that, you know, this will be the quarter where you can see that turnaround or a first prototype delivery that we can look forward to?

Umesh Chaudhary Chairman

So, we are looking at the first train to be delivered in the end of Q3 or beginning of Q4. So, let's say between Q3 and Q4 will be the first Vardhavarat train that will get delivered.

Speaker 4

Sure, got it. Second thing, if you can speak a little bit about your NAVAL expansion plan, what is it that you're planning to do, and then how are you planning to fund the CapEx out there? You did speak about starting the NAVAL at the end of this year. Can you speak, help us understand, let's throw a little bit more color on what can we expect out here?

Umesh Chaudhary Chairman

Absolutely, sir. So, we have already mentioned in the past that the total project cost that we have identified for the TNSL is about 610 crores, for which we have also received approval for the capital shipbuilding scheme for a 25 percent, right? 25 percent. A 25% capital subsidy, which will be given by the government of India. Balance of the CAPEX is going to be funded between a mix of debt and equity in PNSL. The idea of having this as a separate company, as we had also mentioned in the past, was to look for strategic scope financial investors in Teetaga Naval Systems so that the equity outflow from the parent, that is, Teetaga Rail Systems, is of a limited nature. And also, over a period of time, once the business is stabilized, we may look at separately listing this company. But that's something which is to do with the future, which we had announced as the rationale for segregating the shipbuilding business into a separate company. But as of now, what we are going ahead with is, what I mentioned, a 610 crore project for which the land has already been allotted and acquired by us. And we've already got the jetty and construction work is going to be starting very soon.

Speaker 4

Understood, sir. If I may ask a couple of bookkeeping questions. Firstly, if I were to look at the inventory days, I mean, there appears to be some rise out there. I mean, what do this increase in proportion to sales? I mean, the absolute inventory is fine, but as a percentage of sales has gone up. I mean, if you can help us understand that better.

Umesh Chaudhary Chairman

It is always you have a ramp up, sir. So you will get more details with the presentation also. But the inventory number of days I had mentioned in my last investor calls or presentation that the KPI that we are looking for is inventory controlling the freight, which has been disturbed because of the supply chain constraints. When you have supply chain constraints, they are limited to a few items, which we can call as balancing items. So that, you know, the balance material that we have received kind of gets into a stock inventory, but those are temporary in nature. As far as passenger is concerned, we are at a ramp-up stage. This has been a new business for the company, and we are not really monitoring for the first two quarters of this financial year also the inventory carrying, but we are monitoring more on the output ramp-up, and once that is done, inventory carrying will automatically become normalized.

Speaker 4

Can you also touch on the data days? I understand passengers would have higher data days, but it looks closer to 100 out days. I mean, what should we look at as a sustainable number out there?

Umesh Chaudhary Chairman

So just to add one more point to your last point, one more highlight to your last question. This year, we have been able to generate a cash from operation. Free cash flow has been 380 crores as against almost a flat free cash flow in the previous year of March 25, or maybe a slightly negative cash flow in March 25. So, it has been a year which has generated us free cash flow, which is healthy. And to answer the next question, which is debtors, so debtors mostly, you know, once again, in terms of the normalized working capital cycle, the freight has a normalized working capital, net working capital days of 30. The passenger would have met working capital day of about 75. But that will only get achieved once we have achieved some kind of operating leverage or a scale of production, which we expect to achieve by the end of this financial year for the passenger.

Speaker 4

Thank you very much. If I may ask one last question. On the Firema side, if I heard correctly, there is no potential cash outflow either from the business or any contingent liabilities. Is that a fair understanding?

Umesh Chaudhary Chairman

As far as the REMA is concerned, beyond what we have already provided for and taken in our books, there is no further liability that we are going to accrue in terms of the REMA. Of course, you know, I'm talking about in all... Unforeseen circumstances are unforeseen circumstances, but we have provided for everything which is to be provided for or liabilities that have to be taken, and there is no further cash outflow or liability beyond what we have already taken. I would also just add one more point. I'm sorry I missed out, which was slight delays in payments in terms of debtors in the end of the financial year by the government, by the public sector. But that is something which keeps on happening every year. So I see I just pointed that out to me and I'll just highlight it.

Speaker 4

Sure, sir. Thank you very much and all the best. Thank you.

Operator

Thank you. Next follow-up question is from the line of Virat Jain, individual investor. Please go ahead.

Virat Jain Analyst — Individual Investor

Yeah, thank you. Thank you for follow-up, sir. One question I asked last time is, do you expect this last tender, I mean, do you feel confident this last tender will come in three to six months? So that was the last time question. And then the second question is, in the leasing business, do you expect Indian Railways to be a last customer?

Umesh Chaudhary Chairman

So, both of them are questions that we will not be able to answer because we do not have enough information to do that. But I already explained the reason why we believe that wagon requirement is going to be there, whether it is one large tender or several smaller tenders, In just very, very high levels or very order of magnitude basis, without kind of vetting of the data that I'm presenting, which can be always verified from public domain, the overall stock of wagons that the railways have is about 4 lakh wagons, 400,000 wagons. And if you look at the replenishment demand is about 4% of that. If GDP is growing at 6%, they need 6% additional wagons. So 6 plus 4 is 10%. And 4 lakh wagons is what they have. So we believe that there can be ups and downs on certain periods of time, but on an overall basis, the wagon demand is something which has to be there if India's story continues to be there. And we are absolutely certain that the government and the political leadership is fully committed to making India achieve its rightful place in the economic development. So, there is no reason why wagon demand should fall apart.

Virat Jain Analyst — Individual Investor

Okay, and the second question is, this 80,000 wheelchair contract, in FY27, can we pencil in, let's say, 30,000, 40,000 wheelchair supply?

Umesh Chaudhary Chairman

That is, as per the contractual terms, I will not be able to give you the exact number right now, but we will definitely start the supply in FY27. So, what is the exact quantity? I apologize, but I do not have that number ready with me, but we will definitely try to incorporate that in our presentation. Okay. Okay. Thank you. Thank you for answering my question.

Operator

Thank you. Next follow-up question is from the line of Rajesh Bhandadi from Nakoda Engineers. Please go ahead.

Speaker 7

Sir, we were also planning for aluminum coaches.

Umesh Chaudhary Chairman

Thank you. The coaches that we have delivered to Puna are aluminium coaches, and the option quantity that we have got from Puna for the 12 additional trains are also aluminium coaches. So, this makes us, and it's a very interesting question. Thank you for asking this, Vanarisa, but this makes us the only company in the country who has both the capabilities of stainless steel and aluminium coaches. Earlier, we were importing the blackpacks or the sub-families for these advertising coaches from IREMA, from Italy, but now, in the last year, we have imported all the machines that are required. For making those blackpacks within the country, so within this year and the coming year, that is FY27 and beginning of FY28, we will be fully atmanirbhar or self-sufficient to make aluminium coaches from raw material or from extrusion onwards. So, that will make us fully integrated manufacturers of both aluminum and stainless steel coaches. By the way, world over, high-speed trains are also made in aluminum. So, that also opens up our opportunity, and that is going to be something that we will definitely be working towards. And I have mentioned this in the past in my public interaction, media interaction, that we would... Consider ourselves to be fully prepared and ready to take on the next challenge for Indian infrastructure, which is high-school friends.

Speaker 7

Sir, a question. When we say coach or car, do we mean a double?

Umesh Chaudhary Chairman

Yes, coach or car is a double. Sometimes we call the car, sometimes we call the coach.

Speaker 7

Yes, yes. So, a double, that is approximately around 10 years?

Umesh Chaudhary Chairman

Thank you.

Operator

Ladies and gentlemen, as there are no further questions, I would now like to hand the conference out to Mr. Omish Chaudhary for closing comments.

Umesh Chaudhary Chairman

Thank you very much. Thank you, everybody, for participating in this call, and thank you for the very, very interesting, insightful questions that were asked. We believe that... India infrastructure story is in a very interesting moment, and thanks to the support that all of you, all the investors, and all the customers, and the stakeholders, employees have provided, the timely entry of the company into alternative business, which is the passenger rail segment business, makes us unique in this full infrastructure story, We are able to cater to both streams, which is the freight growth story of India and the passenger growth story of India. Very confident, we are very bullish of both these stories continuing in a very healthy manner, in a very forward-looking manner, and we look forward to playing our own role in the infrastructure growth in both these segments and, of course, in the shape-building segment. So, thank you very much for the continued support, and I look forward to interacting after the next quarters.

Operator

Thank you very much. Thank you, Mr. Mahesh Chaudhary, for taking out time and addressing the participants' questions. On behalf of Klitagra, Rail Terms Limited, that concludes this conference, thank you for joining us, and you may now disconnect your lines. Thank you.

Analyst Q&A · 8 questions
Full-screen source Call document