Nov 5
Earnings call
Pipeline connectivity could unlock higher gas production
Prabha Energy Limited expects Jharia pipeline connectivity by January 2027 and initial production from Q4 FY’27, while North Karanpura connectivity is targeted for March 2027. Peak production from both blocks is expected during FY’28–FY’29.