Skip to main content

GOLD · GoldMining Inc. · Documents

1.1100 CAD +0.0500 (+4.72%) At close · Nov 6 Intraday price with Plus

The company's reports, filings, earnings calls and investor events, most recent first. Search these from Claude or ChatGPT →

Annual report FY2025 Net loss 13.48M CAD 40-F filed Feb 27, 2026
2026
Nov 5
Current report 6-K
São Jorge pre-feasibility advances with permitting studies underway

GoldMining Inc. commenced environmental and socioeconomic baseline studies for São Jorge while engaging SLR Consulting and CLAM Environmental; three rigs have drilled over 1,000 metres in the planned 6,000-metre infill program.

4 source passages
GoldMining Inc. (the "Company" or "GoldMining") (TSX: GOLD; NYSE American: GLDG) is pleased to announce that, in conjunction with the previously announced pre-feasibility study ("PFS"), the Company has commenced environmental and socioeconomic baseline studies required for the preparation of the Environmental Impact Assessment (“EIA”) and Environmental Impact Report (“RIMA”) to support the multistep licensing and permitting process at its 100%-owned São Jorge Gold Project ("São Jorge" or "Project"), located in Pará State, Brazil. The Company has engaged global engineering firm SLR Consulting (“SLR”) to lead the multidisciplinary engineering and metallurgical work required for the PFS. CLAM Environmental (“CLAM”) has been engaged to execute the environmental and socioeconomic baseline studies required for the preparation of the EIA and the RIMA to support the multistep licensing and permitting process in Brazil. Three diamond core drill rigs are currently turning on site, with over 1,000 metres safely drilled to date in the planned 6,000-metre program, which is designed to improve confidence in the current Mineral Resource Estimate and to provide the geotechnical and metallurgical data necessary to inform the conceptual mine plan and process flowsheet for the PFS. Open the document at this passage
Oct 28
Current report 6-K
Current report

GoldMining Inc. commenced a Pre-Feasibility Study and began a 6,000-metre infill drilling program with three rigs at its 100%-owned São Jorge Gold Project in Brazil, with PFS completion anticipated in the first half of 2028.

Oct 23
Current report 6-K
Current report

GoldMining published its fourth annual Sustainability Report for fiscal 2025, reporting zero lost-time incidents, zero reportable environmental incidents, 1,887 hours of training, and 100% of drill sites reclaimed.

Oct 14
Current report 6-K
Current report

GoldMining Inc. reported a net loss of (30,675) for the nine months ended August 31, 2026, revised prior-period figures after reclassifying U.S. GoldMining warrants as derivative liabilities. Exploration expenses were 16,125, and cash and cash equivalents were 16,675.

Read from the first part of this long document
Oct 14
Current report 6-K
Current report

GoldMining Inc. appointed Alexandre Soares Pimenta as Project Director for its 100%-owned São Jorge Gold Project in Brazil, where he will lead pre-feasibility activities and preparation for infill diamond drilling to support further evaluation and development planning.

Oct 14
Report SEDAR+
MD&A
Oct 6
Current report 6-K
Current report

GoldMining Inc. reported that YAR-45 at its Yarumalito Project returned 399.9 m of continuous mineralization from surface at 0.45 g/t AuEq. The four-hole, 1,218 m program finished on schedule and within budget; assays for YAR-46 to YAR-48 remain pending.

Sep 24
Report SEDAR+
MD&A
Jul 14
Report SEDAR+
MD&A
Apr 10
Report SEDAR+
MD&A
Showing 1–50 of 695 documents