Skip to main content

GOLD · GoldMining Inc.

1.1100 CAD +0.0500 (+4.72%) At close · Nov 6 Intraday price with Plus

Price & Indicators

Drag to pan · scroll to zoom
20d MA 50d MA 200d MA Earnings Investor day
Close1.1100 CAD Open1.0600 CAD Day1.0500–1.1150 CAD 52W close1.0000–2.9200 CAD Avg vol 30d266K DataJan 2020–Nov 2026

Latest documents

2026
Nov 5
Current report 6-K
São Jorge pre-feasibility advances with permitting studies underway

GoldMining Inc. commenced environmental and socioeconomic baseline studies for São Jorge while engaging SLR Consulting and CLAM Environmental; three rigs have drilled over 1,000 metres in the planned 6,000-metre infill program.

4 source passages
GoldMining Inc. (the "Company" or "GoldMining") (TSX: GOLD; NYSE American: GLDG) is pleased to announce that, in conjunction with the previously announced pre-feasibility study ("PFS"), the Company has commenced environmental and socioeconomic baseline studies required for the preparation of the Environmental Impact Assessment (“EIA”) and Environmental Impact Report (“RIMA”) to support the multistep licensing and permitting process at its 100%-owned São Jorge Gold Project ("São Jorge" or "Project"), located in Pará State, Brazil. The Company has engaged global engineering firm SLR Consulting (“SLR”) to lead the multidisciplinary engineering and metallurgical work required for the PFS. CLAM Environmental (“CLAM”) has been engaged to execute the environmental and socioeconomic baseline studies required for the preparation of the EIA and the RIMA to support the multistep licensing and permitting process in Brazil. Three diamond core drill rigs are currently turning on site, with over 1,000 metres safely drilled to date in the planned 6,000-metre program, which is designed to improve confidence in the current Mineral Resource Estimate and to provide the geotechnical and metallurgical data necessary to inform the conceptual mine plan and process flowsheet for the PFS. Open the document at this passage
Oct 28
Current report 6-K
Current report

GoldMining Inc. commenced a Pre-Feasibility Study and began a 6,000-metre infill drilling program with three rigs at its 100%-owned São Jorge Gold Project in Brazil, with PFS completion anticipated in the first half of 2028.

Oct 23
Current report 6-K
Current report

GoldMining published its fourth annual Sustainability Report for fiscal 2025, reporting zero lost-time incidents, zero reportable environmental incidents, 1,887 hours of training, and 100% of drill sites reclaimed.

All documents

Technicals

trend & momentum for long-term holders illustrative — not investment advice
Price context
position in its 52-week range
Range low 1.0000 CAD Now 1.1100 CAD · 6% Range high 2.9200 CAD
vs 200-day avg -29% vs 50-day avg -14%

Illustrative technical + ownership context — a signal mix, not investment advice.

Performance

5D 20D 120D MTD YTD
XTSE:GOLD +6.7% -13.3% -27.5% +6.7% -35.5%

Exchange listing

Market
XTSE
Ticker
GOLD
ISIN
—
Security
Ordinary share
Trading currency
CAD

Company with tickers: GLDG

Other listings of this company

Share classes and depositary receipts can have different prices and dividends.

Latest price

Plus & Pro

Follow GOLD during the session: the latest price, the day's change, range and volume. Closing prices stay free.

Recent dividends

No verified dividend payments are available for this listing yet.

Upcoming investor events

No upcoming investor events are listed for this company yet.

Earnings calls

No earnings calls have been captured for this company yet.