Fermi entered a non-binding LOI with the IG Tenant covering approximately 600 MW of powered land at Project Matador, supported by a $200 million prepayment and $15 million early construction agreement. It remains without revenue and disclosed going-concern doubt.
FRMI · Fermi Inc.
The latest filing states the doubt was alleviated.
“Considered in the aggregate and before consideration of management’s plans, these conditions raise substantial doubt about the Company’s ability to continue as a going concern within that period. Accordingly, management has concluded that its plans alleviate the substantial doubt, and the accompanying unaudited condensed consolidated financial statements have been prepared on a going concern basis.”View the 10-Q filed Nov 12, 2026
You came from your AI assistant. Add Equibles to it and ask about this data directly, free.
Price & Indicators
Up next
Latest documents
Fermi Inc. secured a $200 million prepayment agreement from an undisclosed investment-grade hyperscaler to advance an initial 600 MW development at Project Matador beginning in 2027. Third-quarter net loss was $141.6 million.
Fermi Inc. said Governor Perry and Mr. Stein were not elected at the October 30, 2026 Annual Meeting but remain Class I directors. The company believes investors breached an agreement by voting against Governor Perry; investors dispute that obligation.
Fermi Inc. announced its subsidiaries and MUFG Bank amended the February 10, 2026 Equipment Supply Loan Financing Agreement, eliminating a covenant to lease or offtake 400 MW at Project Matador by November 10, 2026, and paid $25 million in amendment fees.
On October 14, 2026, Fermi Inc. disclosed a binding 15 - year, $6.5B Phase one TensorWave lease at Project Matador for 222 MW, backed by AMD credit support, with phased delivery beginning Q4 2027 and completing early 2028.
Metrics snapshot
Useful current figures from the complete screener profile.
AI Brief
Q2 FY26 earnings call · Aug 13, 2026TL;DR. Fermi delivered on all five objectives of its 90-day plan: signed a binding 15-year anchor lease with TensorWave for up to 650 MW (~$6.5B Phase 1 revenue), appointed Lee McIntire as CEO, formed a 2.6 GW BOOT alliance with Hillcore and EPC partnerships with Primoris and TSK, raised an upsized $431M convertible note offering with capped-call dilution protection, and received three Siemens F-class turbines at the Port of Houston.
- + Signed binding 15-year anchor lease with TensorWave for up to 650 MW, including $6.5B Phase 1 revenue on 222 MW.
- + Formed Hillcore build-own-operate-transfer alliance adding ~2.6 GW, doubling planned on-site generation to 4.8 GW within ~30 months with $0 Fermi capital.
- + Strengthened balance sheet with upsized $431M 5.00% convertible notes due 2031 featuring capped call that eliminates dilution until stock doubles.
- + Appointed Lee McIntire, a board member since September 2025 with 40+ years leading large-scale construction at Bechtel, CH2M Hill, and TerraPower, as CEO.
- + Three Siemens F-class turbines arrived at Port of Houston in July and cleared customs, bringing landed power assets to 1.5 GW.
- + Secured EPC partnerships with Primoris (Phase 1 balance of plant) and TSK (Phase 2 engineering).
- − Reported $25.8M Q2 net loss ($0.04 per share) with $193.0M G&A year-to-date as company remains pre-revenue in development phase.
AI-generated from the earnings call and 8-K · may contain errors · not investment advice
Equibles Rating
blended score · not investment adviceBlended from price, momentum, positioning, fundamentals & volatility · daily-close · not investment advice. Market backdrop is context, not part of the score.
Technicals
trend & momentum for long-term holders SellIllustrative technical + ownership context — a signal mix, not investment advice.
Key metrics
the company's own KPIs, from written earnings releases and filings| Metric | Latest | Period | YoY |
|---|---|---|---|
| Acquired, Under Contract, or Under Option | 8,400 | Third Quarter 2026 | — |
| Air Permit Filed with TCEQ | 5 | Third Quarter 2026 | — |
| capital invested in Property, Plant, and Equipment | 133.4M | three months ended September 30, 2026 | — |
| current capacity | 2.2 | third quarter 2026 | — |
| early construction and site development agreement | $15M | third quarter 2026 | — |
| Gas turbines on site | 5 | as of October 31, 2026 | — |
| invested in buildout to date | 1.7B | third quarter 2026 | — |
| Less Water Use Through Closed-loop System | 80% | Third Quarter 2026 | — |
| Miles of fencing | 11.3 | as of October 31, 2026 | — |
| Miles of natural gas lines | 4.6 | as of October 31, 2026 | — |
| Miles of water lines | 7.2 | as of October 31, 2026 | — |
| power capacity | 600 | third quarter 2026 | — |
| prepayment agreement | $200M | third quarter 2026 | — |
| Sq. Feet prepared | 13.1M | as of October 31, 2026 | — |
| Data Center Space Secured / Under Contract | 15M | Q2 2026 | — |
| Hillcore BOOT Combined-Cycle Capacity | 2.6 | Q2 2026 | — |
| Natural Gas Firm Supply Secured | 220K | Q2 2026 | — |
| Site Acreage | 8,400 | Q2 2026 | — |
| TensorWave Phase 1 Contracted Capacity | 222 | Q2 2026 | — |
| TensorWave Phase 1 Contracted Revenue | $6.5B | Q2 2026 | — |
| TensorWave Total Facility Power (Including Expansion Options) | 650 | Q2 2026 | — |
| Total Planned On-site Generation Within ~30 Months | 4.8 | Q2 2026 | — |
Figures exactly as the company stated them in writing · click a metric with a to chart its history · period links open the stating document · "filing" marks figures stated in the 10-K/10-Q · YoY needs an exactly comparable prior-year period
Versus peers
REIT - Specialty — same industry group| Company | Mkt cap | YTD | Rev growth Y/Y | P/E | Short % shares |
|---|---|---|---|---|---|
|
FRMI
this stock
Fermi Inc.
|
$1.60B | -69.0% | — | — | 9.0% |
|
EQIX
Equinix Inc
|
$103.25B | +36.1% | +7.8% | 62.6 | 1.8% |
|
AMT
American Tower Corp
|
$88.46B | +8.6% | +5.1% | 26.9 | 1.4% |
|
DLR
Digital Realty Trust, Inc.
|
$62.82B | +15.6% | +10.0% | 70.9 | 2.2% |
|
CCI
Crown Castle Inc.
|
$38.02B | +0.6% | -4.4% | 47.0 | 2.3% |
Peers by industry group · P/E from as-reported trailing EPS · short % is of shares outstanding
At a glance
key data from every section- Filed
- Nov 12, 2026
- This year
- 35
Fermi entered a non-binding LOI with the IG Tenant covering approximately 600 MW of powered land at Project Matador, supported by a $200 million prepayment and $15 million early construction agreement. It remains without revenue and disclosed going-concern doubt.
ViewPerformance
| 5D | 20D | 120D | MTD | YTD | |
|---|---|---|---|---|---|
| FRMI | +49.4% | -17.9% | -62.3% | -5.0% | -69.0% |
| SPY | -1.7% | -3.5% | -1.4% | -2.1% | +8.5% |
| vs SPY | +51.1% | -14.4% | -60.9% | -2.9% | -77.5% |