Skip to main content
MOLDTECH 99.3900 INR +1.20%
MOLDTECH · Mold-Tek Technologies Limited
99.39 INR +1.18 (+1.20%) At close · Nov 13
Market Cap
5.73B INR
Shares
57.61M
Volume · Nov 13 85.24K Avg daily vol (25 sessions) 77.61K
All webcasts

Earnings call · FY2027 Q2

Mold-Tek Technologies Limited (MOLDTECH) Q2 2027 Earnings Call Transcript

Concluded Nov 4, 2026 Audio replay
Nov 4, 2026 51:30 108 turns
Period
FY2027 Q2
Runtime
51:30
Sources
3 artifacts
Revenue 608.13M INR +51.2% YoY
Diluted EPS 3.34 INR/shares +496.4% YoY
Net income 0 INR
Open full screen Slides 24

Transcript & audio

51:30 Audio
Operator

Ladies and gentlemen, good evening. I'm Akash moderator for the conference call. Welcome to Moltec Technologies Ltd. Q2 and H1 FY27 earnings conference call. We are pleased to have with us Mr. Lakshmana Rao, sir, who is the Chairman and Managing Director of Moltec Technologies Ltd. As a reminder, all participants' line will be in listen-only mode, and there will be an opportunity for you to ask questions after the management's opening remarks. Should you need assistance during the conference call, please signal an operator by pressing star and zero on your touchstone telephone. Please note that this conference is being recorded. Before we begin, I would like to point out that this conference call may contain forward-looking statements about the company, which are based on the beliefs, opinions, and expectations of the management as on date of this call. These statements do not guarantee the future performance of the company and may involve risks and uncertainties that are difficult to predict. I would now like to hand over the floor to Mr. Lakshman Rao, sir, Chairman and Managing Director. Thank you, and over to you, sir.

Lakshmana Rao Chairman

Good afternoon, gentlemen, and thank you very much, Akash. I'm very glad to inform you that fabulous results have been announced by Moltec Technologist for the Q2. The six-month stand-alone profit has doubled that of the last full year, Pat, by... 21 crores compared to 10 point, is this the full year? Yeah. So, the PAT for the standalone performance is at 20 crores for the six-month period, and for the quarter ending September, company's standalone turnover has gone up by 39% to 92 crores, and PAT has more than grown four times, to be precise, 4.4 times to 20.19 crores. That is for the H1. And coming to the Q2, the turnover has been 46.64 crores, up by 25% compared to last Q2. And profits are more than tripled from 3.15 crores to 10.16 crores. Similarly, EBITDA also grown by 32.5%. Recording one of the best quarters ever in the history of the company. The last year, full year, profitability was after tax as 10 crores. Whereas in this first six months itself, companies have achieved a 20 crores standalone profit. However, after adding the consolidating the burials numbers, the PAT has come down to 18.62 crores compared to 10 crores last year for the full year. The current year H1 itself, company consolidated profits have shot up to 18.62. And compared to the last year H1, the jump is by almost 375%, that is 4.7 times improved in their profitability. So these are all possible due to the improved product mix of the company, improved diversification and operational excellence especially, and also entering into high-value engineering services in poles and towers and also in structural steel detailing. And adding back our structural steel design also started contributing reasonable numbers and improved operational efficiency.

Operator

Thank you, sir. Ladies and gentlemen, we will now begin the question and answer session. If you have a question, please press star and one on the telephone keypad and wait for your turn to ask the question. If you would like to withdraw your request, you may do so by pressing star and one again. Ladies and gentlemen, if you have any questions, please press star and one on your telephone keypad. The first question comes from the line of Mr. Kaustabh Bhubna from BM SPL Capital. Please go ahead.

Kaustabh Bhubna Analyst — BM SPL Capital

Yeah, hi. Thanks for taking my question. So, similar to last quarter's call, you know, I have the same question on how sustainable is this... Margin, EBITDA margin and profitability performance that we've had in the first half. Can we maintain the same type of margins and profitability going into the second half? Will it be even better? And then is there any sort of quantitative and qualitative guidance you can give us into FY28? You know, the reason I ask this is because even in the U.S., there's a lot of... You know, volatility in many different aspects, politically, et cetera. So, you know, what's management's view on this?

Lakshmana Rao Chairman

Okay. See, I can understand Kaustab because of the erratic performance in the past few years, ups and downs. But now I can assure you that the company is on a very solid ground. We have taken steps to eliminate the loss-making BIW segment. We have downsized it considerably from 150 resources to just 40, 45 resources. And we have been trying for electrical vehicle-related automobile services for the last three years without much success. And those numbers used to vary a lot. You know, one quarter it used to be half a million and then down to 100K in the next quarter. So that kind of uncertainty is now completely eliminated from the company's performance. And that's why you are seeing a quarter-on-quarter consistent and rather improved performance. And I'm also glad that the company, what we acquired, Beryl, has received some major orders in the last month, a couple of months ago, and they are now becoming operable from October onwards. So hopefully in Q3, Beryl might be in the positive, which continues to be in the negative in the last two, three quarters. So that is another favorable development. And in the poles and towers and power distribution services, which come under MAS, we have several new contracts signed and several new fixed teams are being created for very well-known utility services companies in the USA. So, we are scampering to add people in that domain and training the managers or retraining some of our engineers into that domain and finding that growth also will be added from Q3 or if not Q3, Q4 onwards. And as I mentioned in my press report, we are also adding a new domain altogether in the civil and land development, which will be a completely new domain for Maltec, and that has very good prospects, and we are starting with one of the leading companies in the U.S., which can take us off in that new field in the coming year. It might take a couple of more months to build up the expertise, but from Jan 5 onwards, those numbers can also be sizable. So I can assure you, I think at least for the next one, one and a half year or two years going ahead, companies' performance will be on the positive track. If Beril also starts making contributions, which we are taking steps to. And EVAM, the management, and focusing them on designing and other areas of high value, we are confident that Beryl also will start contributing from next year. So, overall, put together, the... Whatever disturbances or ups and downs caused by electrical vehicles and our automobile team will be removed for the future. And with these solid gains in other domains, a company's track is now well laid.

Kaustabh Bhubna Analyst — BM SPL Capital

Great. And what's the opportunity on the semiconductor front? I saw on your press release there's a semiconductor opportunity, so is that new business for us, or is that something that the company has already been participating in, and what's the opportunity there?

Lakshmana Rao Chairman

Semiconductors, I think you are getting mixed up. This is regarding our other company, Moltec Packaging Limited, which is Moltec Technologies. I'm talking about the engineering services company. Is there a wrong version of semiconductors in the note? I don't think so. It is about data centers maybe. We are developing data centers.

Kaustabh Bhubna Analyst — BM SPL Capital

There was a mention on semiconductors also, but the

Lakshmana Rao Chairman

manufacturing projects, which data centers, we are providing designing and detailing services to data centers.

Kaustabh Bhubna Analyst — BM SPL Capital

Good night. It's in your advanced opportunities in data center, semiconductor manufacturing, and convention center projects.

Lakshmana Rao Chairman

Semiconductor manufacturing projects, maybe. The project buildings. Okay. Okay. Okay. Okay.

Kaustabh Bhubna Analyst — BM SPL Capital

Thank you.

Operator

Thank you, sir. The next question comes from the line of Mr. Mahesh Talani from GoCotta.

Operator

Please go ahead, sir. Mr. Maheshtarani, please go ahead with your questions, sir.

Operator

I don't find any response. We are going for the next question. The next participant is Mr. Ramesh Tatia from Long Equity Partners. Please go ahead, sir.

Ramesh Tatia Analyst — Long Equity Partners

Yeah, thank you. Thank you for the opportunity, and congratulations on fantastic set of results, sir. I have several questions. So first is, I think the work on hand has come down quarter on quarter. So any qualitative comments around that, why that happened, and how it will progress through the year?

Lakshmana Rao Chairman

See, the work on hand has dipped a bit from about 4.5 million last quarter to around 4.2 million now. But in the month of October, we have record bookings again, and the number is now better than what it was at the end of June.

Ramesh Tatia Analyst — Long Equity Partners

Okay, that is good to know. The second question is, in the standalone business, can you give rough idea about how much is, you know, steel detailing segment, how much is utility segment, how much is BIW segment, some rough idea on H1 basis is fine.

Lakshmana Rao Chairman

Yeah, I can tell you roughly 75 to 80% of the revenue is coming from structural steel detailing and those areas. And overall, in the overall 5.4 million, I think 5.3 million, 4.4 million is come from... And the rest is from fixed teams of MES and also from... MES alone. That is, MES means automobile services. That's now come down to hardly $100,000 in the quarter. Whereas the fixed teams are growing, that's where we do the utilities services, that is, the electrical towers and distribution services.

Ramesh Tatia Analyst — Long Equity Partners

Okay, okay. And this utilities piece is expected to grow faster, right?

Lakshmana Rao Chairman

Yes, utilities we are ramping up very rapidly from a team of 30-40 people last year. We are already 70-75 and planning to ramp it up to 120 people by March next year because it's very difficult to build up these skill sets. So apart from recruiting from outside, we are developing the training and training the modules to...

Ramesh Tatia Analyst — Long Equity Partners

Yeah, yeah. Okay, okay. And in the steel detailing, sir, we are, you know, trying to climb the value ladder in terms of going into design, going into, what do you say, connector design. So, can you just give some update on that also? How is that going?

Lakshmana Rao Chairman

The connection design is still improving. We are in line with our expectation of reaching about a million dollars in this year. And we are also looking at the opportunities for acquisition in the design field, structural designing, still yet to find a correct fit, but once that happens, that segment also will take off.

Ramesh Tatia Analyst — Long Equity Partners

Okay, okay. And then on coming to Beryl, so... How is, I mean, I think there is this hurricane happened recently, Sias, I think the damage was in Georgia, Florida, and Alabama, and I think we have license to practice in Florida and Georgia. So, does that provide you any meaningful opportunities for next, I don't know, six months, 12 months?

Lakshmana Rao Chairman

Yes, it will certainly improve it. I wouldn't say it will be a huge opportunity, but certainly the number of instruction cases and then our expert witness and design and repair services division will certainly get more traction due to this recent cyclone. But, apart from that, we are now looking at much stronger stability for the company, Beryl, and we are looking at other domains like civil and architectural, which can also, Beryl also can play a role in it. So, that's a new opportunity we got, wherein Beryl will play a part role, and it will help all of us to ramp up the numbers in that new domain. More details will be in a position to discuss probably next quarter.

Ramesh Tatia Analyst — Long Equity Partners

Okay, okay, look forward to that. And this land development segment, I think, maybe some color around that, what kind of order booking? That's what I'm saying.

Lakshmana Rao Chairman

That is the area we, along with Beryl, are tying up, already tied up an MOU with a client, and the work has to really take off from November end. So, hopefully, when we meet next time in Feb, March, I'll be able to share more details.

Ramesh Tatia Analyst — Long Equity Partners

Okay, okay. And this final question, Beryl EBITDA break-even in Q3?

Lakshmana Rao Chairman

Q3 is just a little below the break-even. They had a small loss of about $25,000, which has come down compared to the previous quarter, which was $70,000, $75,000. So it's now $25,000 loss in Q2. And hopefully in Q3, we look forward to it crossing the break-even.

Ramesh Tatia Analyst — Long Equity Partners

Okay, okay, and you say the next 12 to 18 months, we expect good growth, so 20% is like a good number to model?

Lakshmana Rao Chairman

Top-line growth, what we achieved is around, in the standalone, it is 23%, including the dollar gains, and for the consolidated, it was 25%, I think. Twenty-four percent in H1. So, we continue to see at least 18 to 20 percent top-line growth in the consolidated, and maybe around similar 20-25 percent in the standalone, subject to dollar fluctuations.

Ramesh Tatia Analyst — Long Equity Partners

During next year, right? To next 12 to 18 months.

Lakshmana Rao Chairman

Yeah, next 12 months, yeah.

Ramesh Tatia Analyst — Long Equity Partners

Yeah, okay. Thank you. Thank you for answering all my questions. All the best.

Operator

Thank you, sir. The next question comes from the line of Mr. Manish and Andrew J. Minister. Please go ahead.

Hello, sir. Thank you for the opportunity and congratulations on the good set of numbers. I have a couple of questions. One, did we have any forex gain or loss during the quarter? And if yes, what was the amount?

Lakshmana Rao Chairman

Yeah, in fact, forex loss is around 70 lakhs in this quarter compared to 1.5 crores gain in the last quarter. So that means if you effectively take away the forex element, the profit growth compared to Q1 is much better. What it is showing is 6%, but it in fact would be more than 14-15% at the operating level.

And going forward, I mean, do we expect similar, what you say, profits or losses on a limited scale, given that rupee has stabilized around that 96, 97 level?

Lakshmana Rao Chairman

Yeah, yeah. Now the rupee is stabilizing around 95, we'll be having some forex gain, rather, if it stays somewhere at that level. Otherwise, it will be neutral. So, in the Q3, we'll have some benefit. If the dollar remains around 95 levels, we'll have some gain rather than a loss which you suffered in Q2.

Sure. And my second question was on barrels. So on our previous call, we talked about outsourcing barrels, what do you say, work to India slowly but steadily. I think the target for that was Q4 of FY27. So where are we on that?

Lakshmana Rao Chairman

Yeah, now they're currently one person who is under L1 processing is now currently positioned in Tampa. He's a professional engineer himself, Indian, but qualified in the USA. And he's now currently taking charge of the design and representing Moltec or Beryl as a design head. And he has a team of five people already built up here in Adabad who will be supporting him in his future growth. This $1 million Hillsborough County order, what we received two months ago, is predominantly designed. So it is now, timing is good, that work can be handled through our design team, which is strengthened with our six engineers. So we look forward to better performance coming from Beryl. If not, Q4 is, you know, will be impacted by several holidays in USA, but at least from Q1 of their Q1 or our Q4, it should be contributing. Thank you.

Sure, sir. So, when do we see the benefits of the barrel acquisition kind of playing out in terms of margins?

Lakshmana Rao Chairman

I'm confident it will happen in the year 27-28 for us because it takes at least an year to understand the business, set up the correct KREA and people in place, and also get the outsourcing moved to India. So it's hardly nine, ten months we acquired Beryl, and now we got a full grip on the subject, and people have been placed there, and our CEO is also frequently traveling and spending time redesigning the team over there in Beryl so that it will be more design-oriented rather than just inspections, which is their predominant forte as of today. But their design team is to be really strengthened, which we have done now, and I think with this going into the market, we will be in a position to improve their barrel performance.

Got it. And one final question, if I can reason that. We will also be looking at a few other acquisitions, and I guess you're planning to US to finalize that. So any update on that?

Lakshmana Rao Chairman

Yeah, we had a good conversation with the prospective seller. We are also studying into their line of business and their ability to ramp up. So, we have a few concerns which we have expressed to them, and we are waiting for their reply. I don't say that we have made any confirmed decision on that. It is still liquid. But we are still looking at other options also, where we are very clear this time that not only the business should be relevant, but also the person should be capable of ramping it up and scale it up. So on that count, we are still not satisfied. So we are still looking at other options.

You got it. Thank you.

Raghav Srivatsava Analyst — Individual Investor

Thank you so much.

Operator

Thank you, sir. Ladies and gentlemen, if you have any questions, please press star and one on a telephone keypad. I repeat, if you have any questions, please press star and one on a telephone keypad. The next question comes from the line of Riyasha from RT Securities. Please go ahead.

Riyasha Analyst — RBC Securities

Hello.

Operator

Hi.

Riyasha Analyst — RBC Securities

Yes. So, my question was regarding that the company has secured multiple data centers related projects. So, like, are these initial engagements with new clients or, like, they offer potential for repeat business? Like, how could we, like, see this multiple vertical become over next 23 years? If you can throw some light on that.

Lakshmana Rao Chairman

Yeah, yeah, data center designing, I mean, mainly drafting, detailing what we are doing is something unique, and now it's not our first job, almost five, six data centers we have done in the last one, two years, but now we are getting more and more traction. I think we have two or three data center work on hand, and further are also expected. Once we have that expertise, obviously our name will be in the market, And any new data centers that are coming up across U.S. will be definitely considered as a preferred detailer. So that will be a good addition to have, and that will improve our workflow.

Riyasha Analyst — RBC Securities

Okay, okay. And also regarding the three-year agreement with the leading plant engineering company, so does the MSA include committed business volumes or will the revenue depend on individual project allocations?

Lakshmana Rao Chairman

No, it is a fixed team arrangement, and in fact, the team is still under buildup. We have, again, 25 people they wanted. We have only 10 to 15 people currently being offered, and we are in the process of ramping up. These numbers will be adding from end of November or end of December at the most. So, as I said, in power distribution, poles and towers, there's a very big depth of talent, and we are one of the very few companies outside US having that kind of skill set. So, we are now trying to double the manpower through training.

Riyasha Analyst — RBC Securities

Okay, okay. And one last question is that the company currently has sufficient energy, engineering, manpower, and execution capacity to support the growth. So, in the future, will it require significant recruitment or infrastructure investments?

Lakshmana Rao Chairman

See, we are looking at two angles. One is internal development, improvement of the efficiency. One of the major reasons for improved performance is operational efficiencies have gone up. Per-person capital, per-person revenues have gone up by almost 15% compared to last financial year, for the first half of the year. And we have an incentive system under retraining. Multiscaling progress training that's going on for last one year is yielding very good results. So both this incentive system and productivity improvement and training is creating a much better utilization of manpower, and the manpower per capita contribution has gone up from last year Q2 at 4.5,000, is now at 5,220. So, there is a significant improvement in the productivity, more than 15-16%, which is in turn resulting into the bottom line improvement. And we are also bringing in automation and some of the tools to improve the output and also quality, without sacrificing the quality. On that ground, your company has started working, and I am sure this will also progressively result in better improvement in the output. So there is no need for huge recruitments going forward. That will be client-driven. Our work is also related to structural side, and that makes our complete domain of civil and structural detailing or designing to almost a conclusion. What we now require is a full member design team that is still we are looking for that can only be created with a proper acquisition. Once that is done, we'll be head of civil engineering services for U.S. right from A to Z. Okay.

Riyasha Analyst — RBC Securities

Okay. Thank you. That is all from my side.

Operator

Thank you. Thank you, sir. Ladies and gentlemen, if you have any questions, please press star and one on the telephone keypad. I repeat, if you have any questions, please press star and one on the telephone keypad. The next question comes from the line of Mr. Madhur Rati from Counter-Cyclical Investments. Please go ahead.

Madhur Rati Analyst — Counter-Cyclical Investments

Sir, thank you for the opportunity. Sir, firstly, if you can help me understand what would be the employee utilization levels, considering the efficiency as well as the scope of work has improved.

Lakshmana Rao Chairman

Yeah, efficiency of the employees has improved by 15%, but still I see a prospect of growing another 15% further from here. That means without increasing much of headcount, our revenues can shoot up another 15%, and accordingly the bottom line can also improve. But it requires a lot of... Our training and then systems and methods of automation, which we are now initiated a few months ago, and that is showing good results. And I hope that the numbers and efficiency numbers especially can improve with all the automation and the new method of incentivization we have created so that the merit gets, you know, rewarded and motivated, and the output and quality both are being measured in a systematic manner and an open system so that the employees are more motivated to do a better job. So that process has started about seven, eight months ago and yielding very good result, and we continue to improve upon it so that it will become a regular standard for the company.

Madhur Rati Analyst — Counter-Cyclical Investments

Got it. And so if I look at Beryl, since we have acquired, and you mentioned that we have received some record orders in October. Sir, so if you can help us understand how is the scope of work changed, and earlier we used to do closer to 15-20,000, or right now maybe closer to 20-23,000 per employee on an annual basis. Sir, can this move to 30-40,000 that we can extract from our customers, or can we charge those kinds of revenues to our customers? If you can help us understand on that.

Lakshmana Rao Chairman

Yeah, yeah, as you're saying the other way, like say from 23,000, if you have 15% improvement efficiency, it will go to 36,000, 37,000. Another 15% can take it to even 35,000 person per month. So that is possible given the efficiency drive and incentivization and also the automation we are bringing in. It is quite possible.

Madhur Rati Analyst — Counter-Cyclical Investments

Got it. And, sir, on the orders that we received in October, if you can help us understand what are these, are they of higher value in nature, just a color on these would be very helpful.

Lakshmana Rao Chairman

No, you are talking about the orders of Moltec or Benil?

Madhur Rati Analyst — Counter-Cyclical Investments

Beryl. So, Beryl, did you mention that we received in October?

Lakshmana Rao Chairman

Yeah, yeah. That Beryl order is mainly a design-based order from the county of Hillsborough, and the work will be starting anytime. I think it started in October initially. The municipality will be selecting a few engineers who are eligible for executing the work for residents, and Beryl won about $1 million work, which has to be executed in maybe 6 to 12 months as per the residents coming in. So we have also initiated a marketing effort from India, showcasing Beryl's background and trying to put our Beryl name coming up in the search more easily, and that kind of marketing initiative also will help more residents to reach for Beryl service, and Beryl will be in a position to invoice the government. So this process of combined marketing effort with design orientation is going to improve the performance of Beryl in the coming quarters.

Madhur Rati Analyst — Counter-Cyclical Investments

Got it. And so just one final question from mentioned, how do we see order booking increases?

Lakshmana Rao Chairman

Three years is a long period in this kind of business, but I can say that if we make an acquisition of a structural engineering company that suits our line of activity, with the civil and land development lines what we are now opening up, we will be a one-shop solution provider for entire gamut of civil projects, and then we can definitely command better respect and even pricing from the general contractors and builders.

Operator

Thank you, sir.

Operator

Ladies and gentlemen, if you have any questions, please press star and one on the telephone keypad. I repeat, if you have any questions, please press star and one on the telephone keypad. The next question comes on the line of Anshul Sharma from Vortex Capital. Please go ahead, sir.

Anshul Sharma Analyst — Vortex Capital

Hello. Am I audible?

Operator

Yeah, I'm sure.

Anshul Sharma Analyst — Vortex Capital

Yeah. Hi, sir. Thank you for the opportunity. Congratulations on a good set of results. I have a question regarding Beryl only. So Beryl has expanded into residential engineering, permit engineering, plan review, and building inspection. So are these new services generating revenue yet and what contribution can they make to the combined performance?

Lakshmana Rao Chairman

Yeah, right through the conference, I'm talking about Beryl. So, yes, Beryl is in the field of permits and inspection and designing also, but the designing has been far neglected area because they don't have proper engineers, and they could not really grab the opportunity of designing. So our idea of acquiring burial is that with their contacts in inspection, depositions, and expert witness services, and to something in design, we will be in a position to grab more and more design work. That is where our strength and our focus is also. So, acquiring burial is not for immediate profitability, but to create a new set of customers, that is, residents, counties, and municipalities of USA, rather than working only for high-rise buildings. High-rise buildings constitute hardly 2% of the overall construction in USA, and we have been living with them with only that domain for the last 20-25 years. So, compared to that residential and land and structural, sorry, civil, structural, architectural, all these services and design, they contribute. 40 to 50 times more than structural steel detailing. So by entering through Beryl, we are reaching that part of the business. Now the civil and land development, which we have got an opportunity from a U.S.-based client, Beryl's background is helping us. Though there are only a couple of people in Beryl who have that knowledge, that will be good enough to showcase to the client that we have team leaders who can train our Indian team. So like this, the benefits of Beryl acquisition cannot be counted only at what Beryl is contributing, but what Beryl can take Moltec into other lines of business. So that is where we are looking at the bigger picture, and as Beryl alone also will be positive, will run into black at least from next financial year.

Anshul Sharma Analyst — Vortex Capital

Okay, Gordon. And so regarding the body invite fixture segment, how much progress has the company made in reducing this dependence on this traditional segment? And apart from that, also regarding the new verticals such as plant engineering and transmission distribution, have they started generating meaningful revenue?

Lakshmana Rao Chairman

Yes, BAW has been brought down from 155, 160 people to hardly 50 people now, and that team is having moderate work, so we are also relooking into whether any further reduction is required, maybe another 510 resources, if they are found to be redundant, we want to retrain them in poles and towers and replace them. Already, training is going on for a set of 20, 25 people whom we want to absorb in other domains. And second question of yours, that Pulse and Towers Distribution Engineering Services, we are very rapidly progressing. The numbers are going to add further by December because it's, in fact, clients want more, but we are not in a position to deliver because those engineers are not readily available here, And we have to develop through training. Fortunately, we have been in this line for the last four or five years. With the emergence of data centers across USA, the power distribution demand across the country has improved, gone up by several times, demanding more and more engineering work required in that domain. So, from a small team of 30, 40 people last year, today we are around 70, 80, and we have demand for beyond 120 people. So, and that too on a fixed, committed basis. So, those numbers will start adding from December onwards, because though the demand is for 120, 110 people, We could currently have only 70-75 people working, and the remaining 45 people are under various years of training. So, starting from Jan, I hope things will be much better in that domain. And plant engineering, we are just doing with a small team and SPM. These are, again, multi-skilled teams are being used there. So there's no buildup of a team unless we see work coming in that channel. So whatever we learn from BAW experience, we want to be careful in ramping up our teams where there could be seasonality or, you know, big swings in the demand.

Anshul Sharma Analyst — Vortex Capital

Okay. Okay, great. And so last question regarding the future plan. So looking ahead, which business segments are expected to be the highest road drivers for Moltec over, let's say, two to three years? And what are the key milestones we investors can track for the team?

Lakshmana Rao Chairman

See, the key investors, benchmarks are always the work on hand on one side, and the other side, I mean, some of, like, you already asked the questions regarding BAW, the lines which are unpredictable and wavering in nature in all 25 years of our service, of our existence, BAW is the only line where we used to have, you know, 200% workload to 20% workload. And nowadays, it's becoming more often they are having less work. That is why we have taken a call to remove or reduce the team size. And going forward also, we don't see much light at the end of the tunnel for BAW. So that will be slowly reduced to a nominal size just to keep in case it takes off. The senior people can handle some work and outsourcing the rest of the work to some of the small players is the action plan. So, another area where you can see for growth is this pools and towers. We're, at least for next 5 to 10 years, some of the contractors and utility managers are telling me in my trip to U.S. recently that they're expecting their growth in the next 5 to 10 years to continue because of the several data centers that are coming up across U.S.A. and substations and power lines have to be drawn and they have to be created in the next 5 to 10 years. So I see that is one area where we can grow, and this new area of civil and land development is completely a new domain where burial also can contribute marginally, at least in introductory and takeoff stage, they can be of help. And together, I see that area can be a big winner in the next financial year.

Anshul Sharma Analyst — Vortex Capital

Okay, I got it, I got it. All right, sir, that's it from my side. Thank you so much, and wishing the best for holding up more technical challenges.

Lakshmana Rao Chairman

Thank you, thank you very much.

Operator

Thank you, sir. Ladies and gentlemen, if you have any questions, please press star and one on the telephone keypad. I repeat, if you have any questions, please press star and one on the telephone keypad. We have a follow-up question from Mr. Kaustab Bhubna from BM SPL Capital. Please go ahead, sir.

Kaustabh Bhubna Analyst — BM SPL Capital

Yeah, I was just wondering, when you mentioned you wanted to do an acquisition to improve your damage of operating, are you planning on also adding, becoming an EPC player, or you will only focus on design and detailing?

Lakshmana Rao Chairman

Sorry, what did you say last question, sentence?

Kaustabh Bhubna Analyst — BM SPL Capital

Are you intending to eventually become an EPC player? Or you will only focus on design and detailing.

Lakshmana Rao Chairman

See, we definitely want to stay at the designing and detailing. We don't want to become an EPC and take up the construction and monitoring, because that will be too much of a responsibility, and the importance of presence in the U.S. is much more required. So, a designing and detailing player himself, including architectural services, can be right-hand to a GC, that's a general contractor or a builder in the U.S. So, that is the role we are aspiring in the next year.

Kaustabh Bhubna Analyst — BM SPL Capital

And this acquisition, would you focus on, like, what... Are you willing to pay a high valuation? Are you looking at a distressed deal? I mean, how do you look at the acquisition when it comes to not affecting the numbers which are currently going well for the company and you project it to go well for the next three quarters at least? How do you not let the acquisition temporarily affect the numbers?

Lakshmana Rao Chairman

Oh, see, going forward, we don't need any other company other than structural designing company. And in structural designing, the numbers are always better than what we are even today, because a structural designer commands much higher pricing, hourly rates, and also respect in terms of in a project execution from the general contractor and a builder. So, our acquisition in future will be certainly only in that direction, a structural designing company, which has ability to expand, ability to ramp up with the addition of Indian team. So, that is what the criteria, and that's what we are looking forward in an acquisition.

Kaustabh Bhubna Analyst — BM SPL Capital

Okay, and if AI spends were to slow down in the United States, right, and if AI infrastructure spends then were to slow down because of this, Then, would that impact our tools business and data center business, or is there enough demand in the existing infrastructure for us to cater to? When you talk about the next two years, Dayan.

Lakshmana Rao Chairman

Yeah, when I mentioned that one of the questions, data centers, we have done four or five in the past two years, and we are doing one or two now, and each is about 300 to 500 K. So a drop in AI and data centers in future also is not going to really impact us drastically in the structural steel detailing. We do anything, any high-rise building, any plant, any stadium, any airport expansion, anything you talk about big structures, we are there. So a data center happened to be a big building, like a huge warehouse, which we also do simultaneously for several other contractors.

Kaustabh Bhubna Analyst — BM SPL Capital

So what I'm saying is data centers is good.

Lakshmana Rao Chairman

It is a good addition to us to have. But if AI and data centers business stop growing in future, we'll find something else. A lot of manufacturing activities, a lot of commercial activities. That is why one of the acquisitions of Beryl makes sense in the long run, because Beryl is a residential service provider. So we are never in residential. We have been always in high-rise buildings, which are commercial, and big buildings like stadiums and airports and commercial buildings, or even plants and plants and buildings. So by getting into Beryl acquisition, we are expanding our duties into residential designing and residential detailing and permit drawings. So that is the idea of when we acquired Beryl, and I'm sure if not now, in a year's time, next year, it should be a positive decision.

Kaustabh Bhubna Analyst — BM SPL Capital

I was talking more on the blues business, the opportunity of the power opportunity in the U.S. I was talking on that front.

Lakshmana Rao Chairman

Yeah, and the power utilities, yes, if the sudden drop in AI comes in and data centers stop happening, probably our utilities' growth might taper down from what we are anticipating, 70 to 100, 125 will certainly happen. But whether that 125 will become 200, 300 people might give a question. But as of today, our contribution or our performance is based on hardly 70 engineers who are working in that domain. But if the domain improves, we'll have much further growth. But if the domain stagnates, I don't think there will be an impact as of today, at least from the current level of performance.

Kaustabh Bhubna Analyst — BM SPL Capital

Okay. Okay. Thank you so much. Thank you.

Operator

Thank you, sir. Ladies and gentlemen, if you have any questions, please press star and one on your telephone keypad. We have a question from Mr. Raghav Srivatsava, an individual investor. Please go with your question, sir.

Raghav Srivatsava Analyst — Individual Investor

Hello, sir. I'm an auditor, sir.

Operator

Yeah, yeah.

Raghav Srivatsava Analyst — Individual Investor

Sir, I want to understand what are the key operational bottlenecks that could restrict the company's ability to scale up over the next two years, and what steps are being taken to address them?

Lakshmana Rao Chairman

One of the main things that could happen in growth is change in demand patterns in USA. If suddenly, US stops growing or they're not going to manufacturing or the civil industry, construction industry gets into a non-negative trajectory, that could probably be the only thing which can impact our performance. The two marginally, because... When such a thing happens also, U.S. will continue to grow at least at 2-3%. And we are hardly serving, as I said in my previous answer, to a domain which is hardly 2% of the overall U.S. construction industry, that is high-rise buildings. Now with the residential buildings entry through Beryl and the new client we acquired recently, our domain is going to be much bigger. So even if something shakes in the high-rise building domain, let's say, in a couple of years, our entry into residential line, which is 10 to 20 times bigger than the domain where we are operating, can definitely give a good support and growth. So I don't see anything that is drastically going to impact our operations in the near future. And coming on the automation front, which can impact manpower or better utilization or better quality, we are also in the forefront of that. And we already initiated steps to benefit from AI or automation in a very small way. And whatever benefits we gain, that can also further improve the overall performance, I guess.

Raghav Srivatsava Analyst — Individual Investor

Okay. Okay. I get it. I have one more question. So, how do we assess the current demand environment from U.S.-based clients? So, are clients increasing outsourcing to India, or are they adopting a more cautious approach towards new project awards?

Lakshmana Rao Chairman

No, no, no. Everybody now in USA has no choice but to outsource, especially in core engineering like civil. There is no civil engineers coming out in US in numbers they require. Core engineering of mechanical, core engineering of civil, come even AA or anything, there will be increasing demand only, and the manpower availability within US for such engineers is rapidly diminishing. So they're really looking forward to outsourcing. That I don't think will come down. What may happen to individual companies may differ. But overall, outsourcing as such has to grow in the U.S. There's no other choice.

Raghav Srivatsava Analyst — Individual Investor

Okay. So one last question I had. What is the strategy to improve the contribution from higher margin projects and reduce dependence on relatively commoditized engineering assignments? Can you throw some light on it?

Lakshmana Rao Chairman

See, one of the ways to improve is improving your productivity and using automation to get more output is a way to gain even in a traditional market, like detailing what we are doing. And entering into structural designing, residential designing, architectural services is another way of growing into high-value-add. So I think Moltec is doing both the things simultaneously. While we are concentrating on efficiency improvement and automation to improve our traditional lines, we are entering into residential, we are entering into civil architectural land development areas, which are high-end demand, and also utility and power distribution, which are in a real take-off stage. So, we are, I think, at the correct sweet spot as of now.

Raghav Srivatsava Analyst — Individual Investor

Got it. Yeah, thank you, sir. That's all from my side. Thank you, sir. All the best and happy Diwali, sir.

Lakshmana Rao Chairman

Thank you and happy Diwali to you.

Operator

Thank you, sir. There are no further questions. Now I hand over the floor to Lakshman Rao, sir, for closing comments.

Lakshmana Rao Chairman

Thank you, Akash. So I thank all the investors and analysts who have been attending this con call of Multitech Technologies Q2. And I also take this opportunity to wish you all a very happy and prosperous Diwali and New Year. And I hope we'll have more opportunities to discuss about the company's future in the coming quarters. Have a nice day, and thank you very much. Thanks, Shekhar, for arranging this conference.

Operator

Thank you, sir. Ladies and gentlemen, this concludes your conference for today. On behalf of Moltec Technologies Limited, we thank you for your participation and for using Dur Sabah's conference call service. You may disconnect your lines now. Thank you and have listened to me.

Analyst Q&A · 9 questions
Full-screen source Call document