Skip to main content

AST SpaceMobile, Inc. Q3 FY2023 Earnings Call

AST SpaceMobile, Inc. (ASTS)

Earnings Call FY2023 Q3 Call date: 2023-11-14 Concluded

Call artefacts

Transcript

Speaker-labelled transcript of the call.

Read transcript
8-K earnings release

Item 2.02 release filed around the call (2023-11-14).

View 8-K filing
10-Q filing

The quarterly report covering this quarter (filed 2023-11-14).

View 10-Q filing
Audio

Call audio is not captured yet.

Slides

A slide deck is not captured yet.

Transcript

Auto-generated speakers
Speaker 0

Good day, and thank you for standing by. Welcome to the AST SpaceMobile Third Quarter 2023 Business Update Call. Please be advised that today's conference is being recorded. I would now like to hand the conference over to your host today, Scott Wisniewski, Chief Strategy Officer of AST SpaceMobile. Please go ahead. Thank you, and good afternoon, everyone. Let me refer you to Page 2 of the presentation, which contains our safe harbor disclaimer. During today's call, we may make certain forward-looking statements. These statements are based on current expectations and assumptions, and as a result, are subject to risks and uncertainties. Many factors could cause actual events to differ materially from the forward-looking statements on this call. For more information about these risks and uncertainties, please refer to the Risk Factors section of AST SpaceMobile's annual report on Form 10-K for the year that ended December 31, 2022, filed with the Securities and Exchange Commission and other documents filed by AST SpaceMobile with the SEC from time to time. Readers are cautioned not to put undue reliance on forward-looking statements, and the company specifically disclaims any obligation to update the forward-looking statements that may be discussed during this call. Also, after our initial remarks, we will be starting our Q&A section with questions submitted in advance by our shareholders. Now referring to Page 3. For those of you who may be new to our company and our mission, there are over 5 billion mobile phones in use today around the world, but many of us still experience gaps in coverage as we live, work, and travel. Additionally, there are billions of people without cellular broadband who remain unconnected to the global economy. The markets we are pursuing are massive, and the problem we are solving is important and touches nearly all of us. In this backdrop, AST Space Mobile is building the first and only global cellular broadband network in space to operate directly with everyday unmodified mobile devices and supported by our extensive IP and patent portfolio. It is now my pleasure to pass it over to Chairman and CEO, Abel Avellan, who will take you through our activities since the last public update.

Abel Avellan Chairman

Thank you, Scott. I would like to welcome everybody to our Q3 2023 earnings call. Turning to Page 4. I would like to start off with our key highlights and updates. We recorded another historic first in the world of connectivity. The worker demonstrated the first and only space-based 5G capabilities and 40 megabit per second data rates. This caps a highly successful testing program that included 2G, 4G, and 5G, with participation from partners, Vodafone, AT&T, Rakuten, and Nokia, validating AST SpaceMobile's satellite-design patented technology and manufacturing strategy. We also are moving full speed ahead with our plans to launch the first five satellites in Q1 2024. Manufacturing is at full speed and progressing well in Midland. As a measure of progress to date, we have already incurred approximately 85% of the planned capital expenditure for these satellites, including launch costs. Transition to our cost profile, as we complete certain nonrecurring R&D initiatives and the first five commercial satellites, we expect adjusted operating expenses to be between $25 million to $30 million per quarter, beginning from Q1 2024 versus historical run rate of approximately $37 million to $40 million per quarter. And lastly, fundraising efforts with multiple strategic partners continue to advance and progress, and the timing is in line with what we disclosed to you a few weeks ago in our interim business update press release. And let's turn to Page 5, I can provide some additional detail on how this is progressing. We're moving forward on definitive documentation and completion of diligence with multiple strategic partners. The strategic investment process is intended to result in new capital and establish new and incremental financial, commercial, and strategic relationships within the wireless ecosystem. This new investment is intended to fund the manufacturing, launch, and operation of additional BlueBird satellites beyond our first five commercial satellites. Overall, we're encouraged by where we are in this process; I hope to be able to share more at any time during November or December. Transitioning back to our technology on Page 6. For the third quarter in a row, we have made telecommunications history. In September, we accomplished another unprecedented leap in space-based cellular broadband by successfully making the first-ever 5G connection for voice and data between an everyday unmodified smartphone and a satellite in space. The 5G call was placed on September 8 from an unmodified Samsung Galaxy S22 located in Hana, Hawaii, in a wireless dead zone. The testing was completed with our partners, Vodafone, AT&T, and Nokia, underscoring our collective success. In a separate tab, we brought previous space-based cellular broadband data sessions to record by achieving a download rate of approximately 14 megabits per second. I would also encourage you to watch the video of the 5G connection and other testing milestones using BlueWalker 3 on our website. Turning to Page 7. Our historic achievement of 5G cellular broadband directly from space comes at a time when the United States has placed an emphasis on ensuring 5G broadband connectivity to all Americans. Today, less than half of the geographic United States has 5G coverage with download speeds greater than 7 megabits per second. This pace mobile network is the only space-based network designed for cellular broadband, and we will be able to efficiently cover unconnected areas of the country to bring 5G connectivity to everyone. The SEC reopened comments to the 5G phone for rural America rulemaking process, which we participated in. We had encouraged the commission to make satellite networks eligible for funding through this program and look forward to monitoring developments in the rule-making process in the near term. This clear need that we are meeting is a key part of how we have been able to develop strong wireless operator partnerships over time. On Page 8, I want to give you a few examples of how our collaboration has been highlighted by our MNO partners. First, with a quick review from how Vodafone is thinking about offering our service to seamlessly augment their market-leading terrestrial network. They will use the first and only space-based cellular broadband network to offer voice calls, SMS texts, video calls, Internet browsing, email, music streaming, and social media anywhere that the Vodafone subscriber may be located. And with AT&T, for the second quarter in a row, they have highlighted us in front and center as a key milestone in their history. And on our earnings call, we are talking about the support we received for a direct 5G voice call. The high-profile public support reflects the seriousness and depth of these relationships. Of course, AT&T and Vodafone are key partners for us, but they are not the only ones. Turning to Page 8 and 9, we're proud to have MOUs and agreements with over 40 of the largest mobile network operators around the world, representing over 2 billion subscribers that will become accessible to us as we deploy our network. These MNOs include Vodafone, Rakuten, AT&T, Bell, Canada, Indosat, Liberty Latin America, and others. Before I provide an update on our manufacturing progress, I want to take a minute to highlight the strength of our intellectual property on Page 10. Our IP portfolio continues to grow, now accounting for over 3,100 patents and patent-pending claims, over 30 patent families, over 25 U.S. patent applications, and over 10 additional patents around the world. Our strategy since founding has been to patent key aspects of our direct-to-device value chain on an end-to-end basis, as well as key aspects of our manufacturing process. Turning to Page 11. We're pleased to report great progress on the manufacturing of our first five commercial satellites at our facilities in Midland, Texas, where we're in advanced stages of the production of key subsystems of the satellites and have a high level of vertical integration over the full process. All key components manufacturing have been brought in-house; we're running three shifts at our Midland facilities and have ramped to approximately 160 manufacturing employees. Let's turn to Page 12. I wanted to give you an update on the manufacturing of our first five commercial satellites, which are in advanced stages in Midland, Texas. It is important to understand the high level of vertical integration in our manufacturing process. Being vertically integrated is very important for us as it allows us to maintain the unprecedented cost per unit delivered for our satellites with the power and capability to deliver broadband directly to everyday smartphones. These capabilities are very unique in the industry and will allow us to run the manufacturing capacity of six satellites per month and 72 satellites per year. Our markets are designed for mass production and are all identical. Our ability to mass-produce them is essential to the low cost of our satellites. In order to mass-produce microns effectively, we have vertically integrated systems of the micron, power system, power storage, electronics, and antennas. We have a solar panel production line in Midland and our own kick line covering glass and interconnect sales from a supplier to lower our costs, extend life, and modify the performance of solar panels to survive in space. We also have a battery pack production line in Midland, which is integrated into the micron. Both the solar panel and batteries were brought in-house after being externally sourced for BlueWalker 3. Our electronics are designed to last seven to ten years while also maintaining low cost. We produce our electronics for our first five utilizing FPGAs, field-programmable gate arrays, and our own PA LNAs to ensure performance in the harsh environment of space. For Block II, the FPGA will be upgraded with our own ASICs. Turning to the next page, our system is composed of a very large phase array, which is built out of microns, a center control processing unit, which we call our controls. This unit is made in-house and includes the structure that houses our Avionic flight software and centers in beamformer, which is a unit that generates creating that turns into cellular cells for managing direct connectivity to devices. This is also made in-house. The key components of this system have been completed and are being integrated in our Midland, Texas facility. The Fly compute is an essential part of our system and is where we hold our added control system to manage the position of this spacecraft and also where we run fly software, which communicates with every sensor and actuator on board to control our spacecraft. This is all made in-house, including the wiring harness. The software and control system is architected and designed in our U.S. offices and gets integrated and tested at our Midland facilities. In this picture, you see the ControlSat component of the Avionics stack, the harness, and all of the ground and flight operations required to manage and control these satellites. It is important to remind you that all these systems and this level of vertical integration is only possible thanks to the fact that we have BlueWalker 3 operating successfully for over a year. That has given us all the learnings and all the required heritage in order to be able to integrate effectively and cost-effectively all parts of our new build of satellites. And with that, I would like to pass over to Sean to provide a financial update.

Thanks, Abel, and good afternoon, everyone. It has been a little over a year since BlueWalker 3 was lifted into orbit in the night sky at Cape Canaveral. Since that time, AST has continued to achieve a series of accomplishments and make progress towards the goal of building the AST SpaceMobile Constellation. We are now redefining the satellite-to-device industry, which is rapidly becoming one of the most exciting innovations in the mobile phone industry in the last 50 years. Since our last earnings call, the AST SpaceMobile team completed more groundbreaking test results utilizing BlueWalker 3, made significant progress towards the expected launch of the five BB1 satellites, and continued to focus on raising capital to fund the AST SpaceMobile Constellation. An exciting and tangible part of this advancement is watching our assembly integration and testing facility in Midland begin its production activity with dozens of technicians and engineers as well as highly specialized processes all contributing to the production of five BB1 satellites for the targeted launch next year. As always, I want to recognize and thank the hard-working team of engineers, technicians, suppliers, and the support and collaboration by our partners, who are some of the most sophisticated wireless companies in the world, including AT&T, Vodafone, Rakuten, and Nokia. I want to start by reviewing our key operating metrics for the third quarter that are displayed on Slide 14. On the first chart, we see that for the third quarter of 2023, we had non-GAAP adjusted cash operating expenses of $37.3 million versus $38.4 million in the second quarter. Non-GAAP adjusted operating expenses exclude certain noncash operating costs including depreciation and amortization and stock-based compensation, which totaled $21.6 million and $19.6 million for the third and second quarters, respectively. Our third-quarter non-GAAP adjusted operating expenses decreased by $1.1 million versus the second quarter. Our research and development expenses fell this quarter as a result of reduced expenditures associated with our ASIC chip design as we continue to get closer to the completion of that work. Our R&D expenses consist principally of nonrecurring development activities for which we typically engage third-party vendors, and payments are based on the completion of milestones. Our engineering services expenses fell, and our general and administration expenses rose modestly in the third quarter. Turning towards the second chart, our capital expenditures for the third quarter were $71.7 million versus $26.8 million for the second quarter. As we indicated on our last call, we expected our level of capital expenditures to increase substantially as we focused our efforts on procuring parts, materials, and systems for the BB1 satellites, as well as to make payments to our provider of launch services. As of the end of the third quarter, we spent over 85% of the expected amounts for these satellites. We are now projecting to spend approximately $115 million for the five BB1 satellites, up from our last estimate of $110 million. On a positive note, a good portion of the increase in cost was a result of a potential customer requesting a change in the inclination of the orbit so that our constellation could provide better coverage for their subscriber base. This change to the orbital location required an additional payment to our launch provider. On the final chart on the slide, we ended the quarter with about $135 million in cash on hand. As we stated in our 10-Q, we believe this cash, as well as our ability to raise capital through our existing facilities, is sufficient to support our expenditures for at least the next 12 months. Our cost positions and capital plans are quite modular, and this characteristic provides us the flexibility to increase or decrease our rate of expenditures depending on changes in our build-out plans and availability of capital. This flexibility provides us comfort that we can manage our liquidity profile dynamically depending on our rate of raising capital. As we head towards the next fiscal year, I wanted to provide guidance on our expected operating expense levels and capital expenditures as we flip towards Page 15. We have been supporting the development efforts of our two satellite designs, Block 1 and Block 2, our ASIC chip design, and the construction of five BB1 satellites. The completion of this BB1 work and a significant portion of the BB1-2 and ASIC design work is expected to result in a material reduction in our adjusted operating expenses and future capital expenditures. This reduction in cash expenditures will be done without a material reduction in our employee headcount, as most of these reductions are related to the completion of third-party work. Overall, our adjusted operating expenses should decline from a range of $37 million to $40 million per quarter to a range of $25 million to $30 million per quarter, with the full effect starting in the first quarter of 2024. We also plan to reduce our level of capital expenditures as we reach the final investments for BB1-1 and the material investments for BB1-2. The timing of the changes in our adjusted operating expenditures and capital expenditures, as I have just described, could be delayed or may not be realized due to a variety of factors.

Speaker 0

Thank you, Sean. Before we go to the queue of analyst questions, we'd like to address a few of the questions submitted ahead of the call by our investors. Operator, could you please start us off with the first question?

Operator

Rolando from Paris asked, can the company discuss the competitive landscape for DTV and differentiate the different offerings that are in the works.

Abel Avellan Chairman

Thanks, Rolando. There have been tremendous developments in direct-to-device services. Over the past year, we have seen other companies pull their hands up on a me-too offering. But clearly, when you get into their details, they are not broadband scalable or compatible with today’s smartphones. This is a hard problem, which has a lot of different elements for success. We have been entirely focused on development of these systems since the funding of our company in 2017. We have invested over $700 million to date in this effort, resulting in over 3,100 patent and patent-pending claims and our own vertically integrated manufacturing capabilities for our satellites. AST SpaceMobile's critical differentiation is that we are the first and only system designed for 5G cellular broadband. We have shown the ability to achieve 5G data rates as well as 4G and 2G. Other systems today are far away from being able to achieve what we have and are primarily narrowband technologies and emergency service offerings. Our very large phase array antenna, combined with our own ASICs, is unique in this space and is critical for achieving 5G directly to existing everyday smartphones to scale up to serve the needs of the 5 billion phones in circulation in partnership with the leading and largest MNOs on the planet.

Operator

Anne from California asked how long from finalizing the ASIC design will you get the chip.

Abel Avellan Chairman

The development of the ASIC was a four-year process with a cost in excess of $40 million that is mostly behind us at this point. The design is substantially complete. We expect we will be able to start getting the first units around three months to four months after the tape out, which is the process where the design gets produced by our foundry partner, TSMC. I want to remind everyone that the first five commercial satellites will be flying with our current FPGAs, which is essentially the programmable version of the ASIC. The ASIC is expected to give us a 10 times improvement in processing bandwidth, from 1 gigahertz to 10 gigahertz of available spectrum per suite, while reducing the power consumption and cost of these satellites.

Operator

Wedin from New Zealand asked, how much out-of-factory testing is AST reliant on? Can everything be tested at this point?

Thank you, Wedin, and I'll take this one. You may recall with BlueWalker 3 that we had to move the satellite off-site several times. This included vibration and other testing. And right before we shipped the satellite to Cape Canaveral, we actually had to go back to California for testing, which was inefficient and introduced extra time to our schedule. Now, for our first five commercial satellites, we will be able to conduct all of our out-of-factory testing in-house at our Site two facility in Midland, Texas. This testing includes component-level and satellite-level thermal vibration and RF testing. This is another great capability that we've brought in-house alongside the vertical integration that Abel discussed earlier. As a result of this, we expect to significantly shorten production times and increase our control of our process compared to BlueWalker 3.

Operator

A participant from New Zealand asked if the company expects to enter into commercial agreements with mobile network operators before or after the launch, given the decision on which markets they plan to initially serve.

As we discussed earlier, we've been continuing to grow the list of MNOs that we have MOUs and agreements with, and we're now at over 40 operators globally who collectively cover over 2 billion subscribers. Our plan is to sign some of these agreements prior to launch. In fact, we recently changed the inclination for our first five satellites based on customer feedback. We're going to be at a 53-degree inclination and this orbit allows our satellites to cover anywhere in the globe up to 59-degrees latitude for both the Northern and Southern hemispheres. And with that, I'd like to thank our shareholders for submitting these questions. Operator, let's open up the call to analyst questions now.

Operator

Our first question is from Benjamin Soff with Deutsche Bank. Please proceed with your question.

Speaker 4

A couple for me. The first one is, is there any more color you guys can share on the strategic investment process? What it is you're looking for and what shape you think those partnerships could take? Thanks.

Abel Avellan Chairman

Ben, I appreciate the question. I think we've put most of the latest information in this presentation already. This is an important phase for us because it lays out not just funding but also commercial and strategic relationships that will be important for us. So, we're very encouraged with where we are right now, and we look forward to more details during November and December.

Speaker 4

Got it. And now that you've achieved 5G connectivity, what's the next major testing milestone you are looking for, if any?

Abel Avellan Chairman

Well, we are turning our attention to the build of the next five satellites. We continue testing with BlueWalker 3, but the major milestones required out of BlueWalker 3 have been completed.

Speaker 4

Okay. Got it. Is there any more information you can provide on the future trajectory of capital expenditures? I heard that it might decline, but I'm curious about the pace and magnitude of that decline. That's all from me.

Obviously, this last quarter, we've seen a pretty big bump up in our CapEx as a result of some final payments on BB1-1 and some other BB1-2 expenditures. We expect the number to materially decrease from there. We don't give guidance on that, but it will be significantly lower than what we've seen in the last two quarters.

Operator

Our next question is Griffin Boss with B. Riley Securities.

Speaker 5

So first for me is, are there any additional insights you can share that you might have learned over the past three months regarding capacity and the ability to process multiple calls concurrently within a certain beam?

Abel Avellan Chairman

Yes. I mean, we have already given preliminary guidance of what the capacity per satellite is and what is the processing bandwidth that we can support. For Block 1, with the FPGA-based system, it is about 1 gigahertz of processing bandwidth. With the ASIC, that is a 10-fold increment to 10 gigahertz of processing bandwidth, and our testing supports these assumptions.

Speaker 5

Okay. Got it. So, with BlueWalker 3, have you been testing multiple calls simultaneously? I haven't seen any data from tests that involve running several calls or video calls at the same time.

Abel Avellan Chairman

Yes. We have tested multiple simultaneous calls. We have also opened up the channels to let hundreds of devices connect to the system. So that also has been verified during the testing.

Speaker 5

Okay. Great. Appreciate that. And then stepping back, just regarding the U.S. national spectrum security that was released yesterday. Just curious if there was anything in that that caught your eye as notable as it relates to supplemental coverage space, or if there's anything in there that suggests to you that the FCC might proceed faster on developing such a framework?

Abel Avellan Chairman

Yes. As you know, we invented direct-to-device. We are the first to demonstrate it at broadband, and we have the only system that supports it. So we are super encouraged by having a presidential notice where the first item is basically a system that replicates what we have invented. So yes, that caught our eye. We're very happy. We're very encouraged by that. I think this will facilitate in the future how our service will be regulated, particularly in the United States. The United States is also a reference for other countries. Together with our strategic investors, we have achieved significant progress around the world in getting this system regulated and made available to solve a big problem. So yes, we're very proud of being mentioned and being part of presidential strategies for spectrum, which is basically expected use to support a system that we invented and where we are the only one that can provide broadband connectivity directly to regular devices. So we are very happy and encouraged by that.

Speaker 5

Got it. Great. And then if I could just sneak one more in. There was a question earlier on the competitive landscape. I was wondering if you could share any of your opinions if you have any as to why you think Qualcomm walked away from Iridium recently?

Abel Avellan Chairman

Yes. Listen, I mean, there's 5 billion phones in circulation. When we launched this design of the system, there was a prerequisite that you do not need any special chip and special frequency or anything special in your device because the moment that you do that, you take those 5 billion phones in circulation to a niche market. And anything that were to change or become an SOS test, we believe that is limited and with a limited market opportunity compared with broadband directly to everyday smartphones. I think that, if anything, it supports our vision that these systems need to support any phone, every phone, everywhere, without any change, chip, or anything proprietary to the phone in order to make it available for all 5 billion phones in circulation.

Operator

At this time, I'm showing no further questions. I would like to turn the call back over to management for closing remarks.

Speaker 0

Great. Thank you, operator. Our company is building a space-based cellular broadband network designed for use with the phone in your pocket today. I want to thank everyone for joining, both the shareholders and the research analysts for the questions. Have a great evening.

Operator

This concludes today's conference. You may disconnect your lines at this time. Thank you for your participation.